Study of New Youth Initiatives in Apprenticeship. Interim Report. Volume 1: Summary and Issues.
ERIC Educational Resources Information Center
CSR, Inc., Washington, DC.
This first volume of the interim report on the Study of New Youth Initiatives in Apprenticeship presents a discussion of site visit findings and implementation issues related to the United States Department of Labor's Apprenticeship-School Linkage Demonstrations. (Volume 2, site visit reports, is available separately as CE 032 792.) Chapter 1…
ERIC Educational Resources Information Center
Council of Chief State School Officers, Washington, DC. Resource Center on Educational Equity.
This report analyzes the experiences of 27 states selected to participate in Carnegie Corporation of New York's Middle Grade School State Policy Initiative (MGSSPI), a 3-year grant program to states to stimulate fundamental reform in schools serving 10- to 15-year old students. MGSSPI states are working to radically transform the education…
Guidance outlining principles and best practices for State and EPA collaboration in inspections and enforcement. work planning and implementation. National Enforcement Initiatives, and outcome and performance measurement.
ERIC Educational Resources Information Center
Reumann-Moore, Rebecca; Lawrence, Nancy; Sanders, Felicia; Shaw, Kate; Christman, Jolley Bruce
2011-01-01
This document summarizes the findings from the initial round of research on the development and piloting of two types of instructional tools designed to support teachers' integration of the Common Core State Standards (CCSS) in literacy and math. In this interim report, Research for Action (RFA) presents key findings from the first half of the…
Interim Report on the Evaluation of the Growth Model Pilot Project
ERIC Educational Resources Information Center
Hoffer, Thomas B.; Hedberg, E. C.; Brown, Kevin L.; Halverson, Marie L.; McDonald, Sarah-Kathryn
2010-01-01
The Growth Model Pilot Project (GMPP) was initiated to allow states to experiment with adjustments to the No Child Left Behind Act (NCLB) status accountability system in order to improve the validity of AYP determinations by giving schools credit for students who are making significant growth. The pilot allowed states, districts, and schools to…
ERIC Educational Resources Information Center
Carmichael, Sheila Byrd; Wilson, W. Stephen; Finn, Chester E., Jr.; Winkler, Amber M.; Palmieri, Stafford
2009-01-01
Subject-matter experts reviewed the content, rigor, and clarity of the first public drafts of the "Common Core" standards released in September 2009 by the Common Core State Standards Initiative (CCSSI) of the National Governors Association and Council of Chief State School Officers. Using the same criteria, the same experts also…
DOT National Transportation Integrated Search
2017-05-01
This five-year project was initiated to collect materials and pavement performance data on a minimum of 100 : highway test sections around the state of Texas, incorporating both flexible pavements and overlays. Besides : being used to calibrate and v...
Alaska Interim Land Cover Mapping Program; final report
Fitzpatrick-Lins, Katherine; Doughty, E.F.; Shasby, Mark; Benjamin, Susan
1989-01-01
In 1985, the U.S. Geological Survey initiated a research project to develop an interim land cover data base for Alaska as an alternative to the nationwide Land Use and Land Cover Mapping Program. The Alaska Interim Land Cover Mapping Program was subsequently created to develop methods for producing a series of land cover maps that utilized the existing Landsat digital land cover classifications produced by and for the major land management agencies for mapping the vegetation of Alaska. The program was successful in producing digital land cover classifications and statistical summaries using a common statewide classification and in reformatting these data to produce l:250,000-scale quadrangle-based maps directly from the Scitex laser plotter. A Federal and State agency review of these products found considerable user support for the maps. Presently the Geological Survey is committed to digital processing of six to eight quadrangles each year.
76 FR 45174 - State Official Notification Rules
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-28
... granted in section 1042(a) to enforce the Act or regulations prescribed thereunder. This interim final... actions or proceedings undertaken under section 1042(a) of the Act, 12 U.S.C. 5552(a), to enforce the Act... than 10 days prior to initiating an action to enforce the Act or any regulation prescribed thereunder...
The Homestake Interim Laboratory and Homestake DUSEL
NASA Astrophysics Data System (ADS)
Lesko, Kevin T.
2011-12-01
The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for developing the Homestake Interim Laboratory and evolving this facility into DUSEL are presented.
ERIC Educational Resources Information Center
Morin, Courtnie; Stanley, Candace
2017-01-01
Building upon Kuh's (2008) research on high-impact educational practices, the authors interviewed Dr. Aaron Thompson to discuss effective implementation of these teaching and learning initiatives and the advancement of faculty development programming to support them. Dr. Thompson is the Interim President of Kentucky State University and Council on…
Implementation of Geostar's RDSS system
NASA Technical Reports Server (NTRS)
Lepkowski, Ronald J.
1990-01-01
The Geostar (Trademark) system began its initial operations in 1988 and was the first domestic satellite system to provide regular service to mobile users within the United States. Here, an overview is given of Geostar's radiodetermination satellite system (RDSS) concept and its development by Geostar, with a focus on the current operational status of Geostar's interim RDSS system and services.
Do Interim Assessments Reduce the Race and SES Achievement Gaps?
ERIC Educational Resources Information Center
Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie
2017-01-01
The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…
1982-05-07
The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.
47 CFR 51.611 - Interim wholesale rates.
Code of Federal Regulations, 2010 CFR
2010-10-01
... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...
76 FR 5564 - Grant of Interim Extension of the Term of U.S. Patent No. 4,971,802; MIFAMURTIDE
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
... DEPARTMENT OF COMMERCE Patent and Trademark Office [Docket No. PTO-P-2011-0001] Grant of Interim... Office, Commerce. ACTION: Notice of interim patent term extension. SUMMARY: The United States Patent and... States Patent and Trademark Office. [FR Doc. 2011-2088 Filed 1-31-11; 8:45 am] BILLING CODE 3510-16-P ...
Interim Administrators in Higher Education: A National Study
ERIC Educational Resources Information Center
Huff, Marie Thielke; Neubrander, Judy
2015-01-01
The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…
Computerization of material test data reporting system : interim report.
DOT National Transportation Integrated Search
1973-09-01
This study was initiated to provide an integrated system of reporting, storing, and retrieving of construction and material test data using computerized (storage-retrieval) and quality control techniques. The findings reported in this interim report ...
Progress and future direction for the interim safe storage and disposal of Hanford high-level waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.
This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less
The New Guard: A Service-Equivalent Force
2012-06-07
quartermas ter , medical , ordinance and inspector general. The bureaus were designed to be more efficient and deliver cost aving; but. onl y created...2. REPORT TYPE. State the type of report, such as final , technical, interim, memorandum, master’s thesis , progress, quarterly, research ...the report, performing the research , or credited with the content of the report. The form of entry is the last name, first name, middle initial, and
2010-01-13
The Department of Health and Human Services (HHS) is issuing this interim final rule with a request for comments to adopt an initial set of standards, implementation specifications, and certification criteria, as required by section 3004(b)(1) of the Public Health Service Act. This interim final rule represents the first step in an incremental approach to adopting standards, implementation specifications, and certification criteria to enhance the interoperability, functionality, utility, and security of health information technology and to support its meaningful use. The certification criteria adopted in this initial set establish the capabilities and related standards that certified electronic health record (EHR) technology will need to include in order to, at a minimum, support the achievement of the proposed meaningful use Stage 1 (beginning in 2011) by eligible professionals and eligible hospitals under the Medicare and Medicaid EHR Incentive Programs.
Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sweeney, M.D.
1995-06-13
This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench beganmore » in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.« less
Evaluation of US 119 Pine Mountain safety improvements : interim report.
DOT National Transportation Integrated Search
2003-10-01
The safety improvement project for a section of US 119 across Pine Mountain in Letcher County was initiated as an interim effort to address safety issues related t o roadway geometrics and specific problems related to truck traffic. : Specific object...
DOT National Transportation Integrated Search
2007-11-01
This interim report to Congress summarizes the progress and initial results of the Federal Highway Administrations (FHWA) and the four pilot communities participation in the Nonmotorized Transportation Pilot Program (NTPP) from its inception th...
2013-09-01
such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...appear in the report, e.g. 001; AFAPL30480105. 6. AUTHOR(S). Enter name(s) of person(s) responsible for writing the report, performing the research ...negatively impacted by the noise] SAFTY ALL NEW military aircraft designs suffer crashes during their initial development peri~ Bringing the F-35
A Non-Traditional Interim Project.
ERIC Educational Resources Information Center
Brown, Diane; Ward, Dorothy
1980-01-01
Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…
Strategic Mobility: An Expanded View with Focus on Readiness and Sustainability
1991-03-25
legitimate government of KOX fled to their friendly, neighboring country of Zulu . The country of Zulu exports strategically Important mineral resources to the...on their border with Zulu . The junta leaders of KOX have stated their desire to gain control over the mining areas of Zulu to help finance their...military buildup. The president of Zulu has Initiated diplomatic proceedings at the United Nations (U.N.); but in the interim, he has requested U.S
76 FR 79679 - Information Collection Being Reviewed by the Federal Communications Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
... with a number of collections in this control number, including line count filings for competitive ETCs...'' exception to the interim cap for competitive ETCs. The interim cap limited the total annual amount of high-cost support competitive ETCs in any state could receive to the amount competitive ETCs in that state...
49 CFR 1152.29 - Prospective use of rights-of-way for interim trail use and rail banking.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 8 2010-10-01 2010-10-01 false Prospective use of rights-of-way for interim trail... Governing Notice, Applications, Financial Assistance, Acquisition for Public Use, and Trail Use § 1152.29 Prospective use of rights-of-way for interim trail use and rail banking. (a) If any state, political...
2008-07-17
OIG is adopting in final form, without change, an interim final rule published on March 26, 2008 (73 FR 15937). We received no comments to the interim final rule. The interim final rule revised the process for advisory opinion requestors to submit payments for advisory opinion costs.
Interim Testing, Socio-Economic Status, and the Odds of Passing Grade 8 State Tests in New Jersey
ERIC Educational Resources Information Center
Babo, Gerard; Tienken, Christopher H.; Gencarelli, Maria A.
2014-01-01
A review of the literature pertaining to the effect and influence of commercially-prepared interim assessments in mathematics and language arts literacy reveals a lack of quantitative data to determine the value of these products for school reform. This study examined the ability of commercially-prepared interim pretest and posttest assessments in…
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2013 CFR
2013-10-01
... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2014 CFR
2014-10-01
... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...
NASA Astrophysics Data System (ADS)
Ries, H.; Moseley, C.; Haensler, A.
2012-04-01
Reanalyses depict the state of the atmosphere as a best fit in space and time of many atmospheric observations in a physically consistent way. By essentially solving the data assimilation problem in a very accurate manner, reanalysis results can be used as reference for model evaluation procedures and as forcing data sets for different model applications. However, the spatial resolution of the most common and accepted reanalysis data sets (e.g. JRA25, ERA-Interim) ranges from approximately 124 km to 80 km. This resolution is too coarse to simulate certain small scale processes often associated with extreme events. In addition, many models need higher resolved forcing data ( e.g. land-surface models, tools for identifying and assessing hydrological extremes). Therefore we downscaled the ERA-Interim reanalysis over the EURO-CORDEX-Domain for the time period 1989 to 2008 to a horizontal resolution of approximately 12 km. The downscaling is performed by nudging REMO-simulations to lower and lateral boundary conditions of the reanalysis, and by re-initializing the model every 24 hours ("REMO in forecast mode"). In this study the three following questions will be addressed: 1.) Does the REMO poor man's reanalysis meet the needs (accuracy, extreme value distribution) in validation and forcing? 2.) What lessons can be learned about the model used for downscaling? As REMO is used as a pure downscaling procedure, any systematic deviations from ERA-Interim result from poor process modelling but not from predictability limitations. 3.) How much small scale information generated by the downscaling model is lost with frequent initializations? A comparison to a simulation that is performed in climate mode will be presented.
22 CFR 127.8 - Interim suspension.
Code of Federal Regulations, 2010 CFR
2010-04-01
... world peace or the security or foreign policy of the United States. The interim suspension orders... Trade Controls will issue an appropriate order disposing of the motion or petition and will promptly...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-08
... ETCs and incumbent LECs serving competitive areas, disaggregation plans (which permit incumbent LECs to...'' exception to the interim cap for competitive ETCs. The interim cap limited the total annual amount of high-cost support competitive ETCs in any state could receive to the amount competitive ETCs in that state...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... 9000-AL23 Federal Acquisition Regulation; FAR Case 2008-036, Trade Agreements--Costa Rica, Oman, and... United States-Oman Free Trade Agreement, and the United States-Peru Trade Promotion Agreement. DATES... interim rule. The interim rule added Costa Rica, Oman, and Peru to the definition of ``Free Trade...
Study of New Youth Initiatives in Apprenticeship. Interim Report. Volume 2: Site Visit Reports.
ERIC Educational Resources Information Center
CSR, Inc., Washington, DC.
This second volume of the interim report provides detailed case study reports on each of the eight Youth Apprenticeship Projects. (Volume 1, an overview of data from the site visits, is available separately as CE 032 791.) Discussion areas covered in each site visit report are local context/operational environment, administrative information,…
Determination of rainfall losses in Virginia, phase II : interim report.
DOT National Transportation Integrated Search
1981-01-01
This interim report summarizes results obtained for the project through May 1981. The objective of the study is to develop rainfall loss parameters for localities in Virginia. For this purpose, the state has been divided into eleven hydrologic region...
ERIC Educational Resources Information Center
Seftor, Neil S.; Calcagno, Juan Carlos
2010-01-01
This final report updates the report "Upward Bound Math-Science: Program Description and Interim Impact Estimates" published in 2007 (Olsen et al. 2007). The 2007 interim report contained descriptive findings from a survey of Upward Bound Math-Science (UBMS) grantees from the late 1990s at the time of the study's initiation and impact estimates…
Feasibility of developing LSI microcircuit reliability prediction models
NASA Technical Reports Server (NTRS)
Ryerson, C. M.
1972-01-01
In the proposed modeling approach, when any of the essential key factors are not known initially, they can be approximated in various ways with a known impact on the accuracy of the final predictions. For example, on any program where reliability predictions are started at interim states of project completion, a-priori approximate estimates of the key factors are established for making preliminary predictions. Later these are refined for greater accuracy as subsequent program information of a more definitive nature becomes available. Specific steps to develop, validate and verify these new models are described.
Evaluation of experimental railroad-highway grade crossings in Louisiana : interim report No. 5.
DOT National Transportation Integrated Search
1980-04-01
This interim report is prepared to provide a review of the performance evaluation exhibited on twenty-three (23) experimental railroad-highway grade-crossing projects in the state of Louisiana. The railroad crossings were installed during a ten-year ...
19 CFR 207.106 - Interim measures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM SUBSIDIZED...
This rulemaking affirms and makes permanent certain amendments previously made on an interim basis to the Code of Federal Regulations (CFR) provisions implementing the Cross-State Air Pollution Rule (CSAPR).
Using ERA-Interim reanalysis for creating datasets of energy-relevant climate variables
NASA Astrophysics Data System (ADS)
Jones, Philip D.; Harpham, Colin; Troccoli, Alberto; Gschwind, Benoit; Ranchin, Thierry; Wald, Lucien; Goodess, Clare M.; Dorling, Stephen
2017-07-01
The construction of a bias-adjusted dataset of climate variables at the near surface using ERA-Interim reanalysis is presented. A number of different, variable-dependent, bias-adjustment approaches have been proposed. Here we modify the parameters of different distributions (depending on the variable), adjusting ERA-Interim based on gridded station or direct station observations. The variables are air temperature, dewpoint temperature, precipitation (daily only), solar radiation, wind speed, and relative humidity. These are available on either 3 or 6 h timescales over the period 1979-2016. The resulting bias-adjusted dataset is available through the Climate Data Store (CDS) of the Copernicus Climate Change Data Store (C3S) and can be accessed at present from ftp://ecem.climate.copernicus.eu. The benefit of performing bias adjustment is demonstrated by comparing initial and bias-adjusted ERA-Interim data against gridded observational fields.
1997-08-29
This interim final rule amendment is issued to implement the Single Audit Act Amendments of 1996 (Public Law 104-156, 110 Stat. 1396) and the June 24, 1997, revision of OMB Circular A-133, "Audits of States, Local Governments, and Non-Profit Organizations" and to replace the existing audit requirements that are superseded by Public Law 104-156 and the revised A-133.
24 CFR 115.207 - Consequences of interim certification and certification.
Code of Federal Regulations, 2013 CFR
2013-04-01
... AND URBAN DEVELOPMENT FAIR HOUSING CERTIFICATION AND FUNDING OF STATE AND LOCAL FAIR HOUSING... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to...
24 CFR 115.207 - Consequences of interim certification and certification.
Code of Federal Regulations, 2014 CFR
2014-04-01
... AND URBAN DEVELOPMENT FAIR HOUSING CERTIFICATION AND FUNDING OF STATE AND LOCAL FAIR HOUSING... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to...
24 CFR 115.207 - Consequences of interim certification and certification.
Code of Federal Regulations, 2011 CFR
2011-04-01
... AND URBAN DEVELOPMENT FAIR HOUSING CERTIFICATION AND FUNDING OF STATE AND LOCAL FAIR HOUSING... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to...
24 CFR 115.207 - Consequences of interim certification and certification.
Code of Federal Regulations, 2012 CFR
2012-04-01
... AND URBAN DEVELOPMENT FAIR HOUSING CERTIFICATION AND FUNDING OF STATE AND LOCAL FAIR HOUSING... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to...
A Continuum Approach for Developing School Leaders in an Urban District
ERIC Educational Resources Information Center
Normore, Anthony
2007-01-01
This study examined a four-staged leadership development continuum for school leaders in a large urban school district in the southeastern United States. The program under examination included: LEAD Program; Interim Assistant Principal Program; Intern Principal Program, and; First Year Principal Support/Interim Principal Program. Qualitative…
Making the Most of Interim Assessment Data. Lessons from Philadelphia
ERIC Educational Resources Information Center
Christman, Jolley Bruce; Neild, Ruth Curran; Bulkley, Katrina; Blanc, Suzanne; Liu, Roseann; Mitchell, Cecily; Travers, Eva
2009-01-01
Under No Child Left Behind, urban school districts have increasingly turned to interim assessments, administered at regular intervals, to help gauge student progress in advance of annual state exams. These assessments have spawned growing debate among educators, assessment experts, and the testing industry: are they worth the significant…
15 CFR 908.5 - Interim reports.
Code of Federal Regulations, 2011 CFR
2011-01-01
... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a weather modification project or activity in the United States on January 1 in any year shall submit to the... actual modification activities took place; (2) Number of days on which weather modification activities...
Abradable compressor and turbine seals, volume 1. [for turbofan engines
NASA Technical Reports Server (NTRS)
Sundberg, D. V.; Dennis, R. E.; Hurst, L. G.
1979-01-01
The application and advantages of abradable coatings as gas-path seals in a general aviation turbine engine were evaluated for use on the high-pressure compressor, the high-pressure turbine, and the low-pressure turbine shrouds. Topics covered include: (1) the initial selection of candidate materials for interim full-scale engine testing; (2) interim engine testing of the initially selected materials and additional candidate materials; (3) the design of the component required to adapt the hardware to permit full-scale engine testing of the most promising materials; (4) finalization of the fabrication methods used in the manufacture of engine test hardware; and (5) the manufacture of the hardware necessary to support the final full-scale engine tests.
Tracking rare orchids (Orchidaceae) in Arizona
Ronald A. Coleman
2001-01-01
Twenty-six native orchid species occur in Arizona, and 14 are considered rare with fewer than 100 occurrences in the state. The author is conducting three studies covering four of the wild orchids: Stenorrhynchos michuacanum, Hexalectris revoluta, Malaxis porphyry, and M. tenuis. The studies are ongoing so only interim results are available. Interim results indicate...
Public School Finance Problems in Texas. An Interim Report.
ERIC Educational Resources Information Center
Texas Research League, Austin.
The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-23
... for Waiver From LG Electronics, Inc. and Granting of the Interim Waiver From Commercial Package Air... LG Electronics, Inc. (LG). The petition for waiver (hereafter ``petition'') requests a waiver from... factors stated in the waivers that DOE granted to Mitsubishi Electric & Electronics USA, Inc. (Mitsubishi...
2012-02-06
The Food and Drug Administration (FDA) is adopting as a final rule, without change, the interim final rule that issued regulations permitting FDA Center Directors to grant exceptions or alternatives to certain regulatory labeling requirements applicable to human drugs, biological products, or medical devices that are or will be included in the Strategic National Stockpile (SNS). FDA is taking this action to complete the rulemaking initiated with the interim final rule.
ERIC Educational Resources Information Center
Jackson, Robert W. B.
This second interim report on declining enrollment in Ontario identifies the major implications of the several factors associated with declining enrollments and makes recommendations for immediate action to contribute to the stability of the system while preparing and initiating long-term policies. The first part of the report deals with…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-01
This decision document presents the selected interim remedial action for the T H Agriculture and Nutrition (THAN) Site, Montgomery, Alabama. This interim remedial action employs the use of extraction wells combined with a pump and treat system to prevent further migration of contaminated groundwater from the Site and to initiate groundwater restoration pending completion of the RI/FS and implementation of the final remedial action.
Nonmanufacturing Businesses. U.S. Metric Study Interim Report.
ERIC Educational Resources Information Center
Cornog, June R.; Bunten, Elaine D.
In this fifth interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, a primary stratified sample of 2,828 nonmanufacturing firms was randomly selected from 28,184 businesses taken from Social Security files, a secondary sample of 2,258 firms was randomly selected for replacement…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
... Hormone AGENCY: United States Patent and Trademark Office, Commerce. ACTION: Notice of interim patent term... No. 5,496,801. The patent claims the human biological product recombinant human parathyroid hormone... human parathyroid hormone, was filed on October 24, 2013, and is currently undergoing regulatory review...
2015-06-23
DISTRIBUTION/AVAILABILITY STATEMENT DISTRIBUTION A 13. SUPPLEMENTARY NOTES 14. ABSTRACT Fighter jets and other aircraft with high specific thrust engines...interim, memorandum, master’s thesis , progress, quarterly, research, special, group study, etc. 3. DATES COVERED. Indicate the time during which the...State the type of report, such as final, technical, interim, memorandum, master’s thesis , progress, quarterly, research, special, group study, etc
CBVE: A Study to Measure Its Effectiveness in Kentucky. Final Report. Interim Period 1.
ERIC Educational Resources Information Center
Vincent, Roger D.; Cobb, Robert A.
An interim study was conducted in Kentucky to determine the effectiveness of Competency Based Vocational Education (CBVE) and to compare its effectiveness to that of traditional teaching methodologies. Research surveys of those directly involved in the implementation of CBVE were used to ascertain if CBVE is meeting its self-stated goals.…
76 FR 56708 - Ohio: Final Authorization of State Hazardous Waste Management Program Revision
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-14
.... January 4, 1989, 54 FR 246.... NESHAPS: Final Standards for May 14, 2001, 66 FR 24270..... OAC 3745-50-41...; Checklist 188.1. NESHAPS: Interim Standards for February 13, 2002, 67 FR 6792. OAC 3745-50-44; 3745-50-66... Waste Combustors 2009. (Interim Standards Rule); Checklist 197. NESHAPS: Standards for Hazardous...
INTERIM -- Starlink Software Environment
NASA Astrophysics Data System (ADS)
Pearce, Dave; Pavelin, Cliff; Lawden, M. D.
Early versions of this paper were based on a number of other papers produced at a very early stage of the Starlink project. They contained a description of a specific implementation of a subroutine library, speculations on the desirable attributes of a software environment, and future development plans. They reflected the experimental nature of the Starlink software environment at that time. Since then, the situation has changed. The implemented subroutine library, INTERIM_DIR:INTERIM.OLB, is now a well established and widely used piece of software. A completely new Starlink software environment (ADAM) has been developed and distributed. Thus the library released in 1980 as `STARLINK' and now called `INTERIM' has reached the end of its development cycle and is now frozen in its current state, apart from bug corrections. This paper has, therefore, been completely rewritten and restructured to reflect the new situation. Its aim is to describe the facilities of the INTERIM subroutine library as clearly and concisely as possible. It avoids speculation, discussion of design decisions, and announcements of future plans.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-13
...The Department of Health and Human Services (HHS) is issuing this interim final rule with a request for comments to adopt an initial set of standards, implementation specifications, and certification criteria, as required by section 3004(b)(1) of the Public Health Service Act. This interim final rule represents the first step in an incremental approach to adopting standards, implementation specifications, and certification criteria to enhance the interoperability, functionality, utility, and security of health information technology and to support its meaningful use. The certification criteria adopted in this initial set establish the capabilities and related standards that certified electronic health record (EHR) technology will need to include in order to, at a minimum, support the achievement of the proposed meaningful use Stage 1 (beginning in 2011) by eligible professionals and eligible hospitals under the Medicare and Medicaid EHR Incentive Programs.
[Response to US review rules on patent subject matter of traditional Chinese medicine compositions].
Liu, Pan; Cao, Ya-di; Gong, Rui-Juan; Liu, Wei
2018-02-01
The United States Patent and Trademark Office(USPTO) issued Interim Guidance on Patent Subject Matter Eligibility on December 16, 2014, bringing certain effects to the review rules on patent application of Chinese medicine compositions. Based on the Interim Guidance, cases analysis was used in this paper to analyze the patent subject matter issues of traditional Chinese medicine compositions in the United States. The researches have shown that the application documents should be properly written in the United States when the patent for Chinese medicine compositions is applied, which can improve the probability of authorization. Copyright© by the Chinese Pharmaceutical Association.
Skylab program earth resources experiment package sensor performance evaluation, volume 1, (S190A)
NASA Technical Reports Server (NTRS)
Kenney, G. P.
1975-01-01
The results of S190A sensor performance evaluation are summarized based on data presented by all contributors to the sensor performance evaluation interim reports. Techniques used in sensor performance evaluation are discussed. Topics discussed include: performance degradation identified during the Skylab missions, S190A and EREP system anomalies that affected S190A performance, and the performance achieved, in terms of pertinent S190A parameters. Additional analyses include final performance analyses completed after submittal of the SL4 interim sensor performance evaluation reports, including completion of detailed analyses of basic performance parameters initiated during the interim report periods and consolidation analyses to reduce independent mission data (SL2, SL3, and SL4) to determine overall performance realized during all three Skylab missions.
Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
TORRES, T.D.
RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will bemore » exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the manufacturer's stated shelf life. In order to determine the transfer line service life this evaluation examines the certification of shelf life, the certification of chemical compatibility with waste, catalog information of ambient ratings and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials. During initial hose procurements, the hose-in-hose transfer line vendor River Bend Hose Specialty (RBHS) submitted a letter, dated 6/8/00, which recommended the service and shelf life of the hose to be seven years. In submittals for later hose procurements, RBHS submitted a letter, dated 11/6/00, which recommended the service life of the hose to be three years. This submittal was followed by documentation, on 2/14/01, which submitted new storage requirements and restated the seven year shelf life. RBHS revised their original hose service life estimate to a more conservative three years due to concerns over the effects of chemicals in transferred waste. The above mentioned submittals from RBHS are the primary drivers of the three year service life limit established by this document.« less
Testimony of Nationally Representative Groups. U.S. Metric Study Interim Report.
ERIC Educational Resources Information Center
National Bureau of Standards (DOC), Washington, DC.
As the 12th in a series of interim reports prepared for the United States Congress on the metric system, this study was authorized by law to reduce uncertainties concerning the issue of converting to metrication and to provide a better basis upon which the Congress may evaluate and resolve it. The testimony of over 230 nationally representative…
Federal Government: Civilian Agencies. U.S. Metric Study Interim Report.
ERIC Educational Resources Information Center
National Bureau of Standards (DOC), Washington, DC.
This second interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, which was authorized by Public Law 90-472, and was prepared by the National Bureau of Standards to provide a better basis for Congressional evaluation of this issue. Participating in this national survey were 55 federal…
Development of interim oak assessment guidelines for the silvah decision-support system
Patrick H. Brose
2007-01-01
Updates to the SILVAH decision-support system make it more applicable to the mixed oak forests of Pennsylvania and other mid-Atlantic states. This update required establishing interim inventory guidelines for assessing the competitive ability of advance oak regeneration. This assessment was complicated by oakâs growth strategy, emphasizing root development in lieu of...
Dan Porter; Valerie Gizinski; Ruskin Hartley; Sharon Hendrix Kramer
2007-01-01
The Mill Creek Property was a commercial timberland acquired by the State of California to protect and restore local and regional ecological values and provide opportunities for compatible recreation. Interim Management Recommendations (IMR) were developed to guide protection, restoration, and public access of the Property until the California Department of Parks and...
Evidencing Impact of Educational Developments: The "Influence Wheel" and Its Use in a CETL Context
ERIC Educational Resources Information Center
King, Virginia
2010-01-01
Large-scale educational development initiatives are widely used to trial and introduce change. One such is the Centre for Excellence in Teaching and Learning (CETL) initiative in England, now drawing to a close. An interim evaluation of this initiative revealed some excellent practice but no major impact. As CETLs strive to gain or sustain…
7 CFR 652.4 - Technical service standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... must approve all new technologies and innovative practices, including interim standards and specifications, prior to a TSP initiating technical services for those technologies and practices. (c) A TSP must...
Prosthodontic Rehabilitation of Patients with Bell's Palsy: Our Experience.
Rajapur, Anand; Mitra, Nirban; Prakash, V Jeevan; Rah, Sajad Ahmad; Thumar, Sagar
2015-01-01
Bell's palsy is an idiopathic unilateral lower motor neuron paresis or paralysis of the facial nerve of sudden onset. It involves loss of muscular control on the affected side of the face. This paper reports the prosthodontic management of patients with Bell's palsy and also describes a technique to stabilize the jaw movements in complete denture patients using interim dentures. A 65-year-old male edentulous patient and a 55-year-old female edentulous patient reported to the department of prosthodontics to get their missing teeth replaced. They both gave history of facial paralysis and were diagnosed for Bell's palsy. Interim training dentures with flat occlusal tables were fabricated first to correct and stabilize their mandibular movements. During initial 4 weeks, there was poor functioning of the interim dentures. Gradually by 8(th) week the patients started stabilizing the interim dentures and were functional. After observing the improvement when the patients had no pain and could stabilize and use the treatment dentures successfully, definitive complete dentures were fabricated. This case report presents a systematic approach to successively rehabilitate edentulous patients with Bell's palsy.
Prosthodontic Rehabilitation of Patients with Bell’s Palsy: Our Experience
Rajapur, Anand; Mitra, Nirban; Prakash, V Jeevan; Rah, Sajad Ahmad; Thumar, Sagar
2015-01-01
Bell’s palsy is an idiopathic unilateral lower motor neuron paresis or paralysis of the facial nerve of sudden onset. It involves loss of muscular control on the affected side of the face. This paper reports the prosthodontic management of patients with Bell’s palsy and also describes a technique to stabilize the jaw movements in complete denture patients using interim dentures. A 65-year-old male edentulous patient and a 55-year-old female edentulous patient reported to the department of prosthodontics to get their missing teeth replaced. They both gave history of facial paralysis and were diagnosed for Bell’s palsy. Interim training dentures with flat occlusal tables were fabricated first to correct and stabilize their mandibular movements. During initial 4 weeks, there was poor functioning of the interim dentures. Gradually by 8th week the patients started stabilizing the interim dentures and were functional. After observing the improvement when the patients had no pain and could stabilize and use the treatment dentures successfully, definitive complete dentures were fabricated. This case report presents a systematic approach to successively rehabilitate edentulous patients with Bell’s palsy. PMID:26668488
ERIC Educational Resources Information Center
Reed, Deborah K.
2015-01-01
This study explored the data-based decision making of 12 teachers in grades 6-8 who were asked about their perceptions and use of three required interim measures of reading performance: oral reading fluency (ORF), retell, and a benchmark comprised of released state test items. Focus group participants reported they did not believe the benchmark or…
2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. Shanklin
2006-07-19
This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13,more » Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.« less
2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. E. Shanklin
2007-02-14
This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less
Childs, J E; Kaufmann, A F; Peters, C J; Ehrenberg, R L
1993-07-30
This report provides interim recommendations for prevention and control of hantavirus infections associated with rodents in the southwestern United States. It is based on principles of rodent and infection control and contains specific recommendations for reducing rodent shelter and food sources in and around the home, recommendations for eliminating rodents inside the home and preventing them from entering the home, precautions for preventing hantavirus infection while rodent-contaminated areas are being cleaned up, prevention measures for persons who have occupational exposure to wild rodents, and precautions for campers and hikers.
2016-07-29
This rule adopts as final, with some modifications, the National School Lunch Program and School Breakfast Program regulations set forth in the interim final rule published in the Federal Register on June 28, 2013. The requirements addressed in this rule conform to the provisions in the Healthy, Hunger-Free Kids Act of 2010 regarding nutrition standards for all foods sold in schools, other than food sold under the lunch and breakfast programs. Most provisions of this final rule were implemented on July 1, 2014, a full year subsequent to publication of the interim final rule. This was in compliance with section 208 of the Healthy, Hunger-Free Kids Act of 2010, which required that State and local educational agencies have at least one full school year from the date of publication of the interim final rule to implement the competitive food provisions. Based on comments received on the interim final rule and implementation experience, this final rule makes a few modifications to the nutrition standards for all foods sold in schools implemented on July 1, 2014. In addition, this final rule codifies specific policy guidance issued after publication of the interim rule. Finally, this rule retains the provision related to the standard for total fat as interim and requests further comment on this single standard.
Getting super-excited with modified dispersion relations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ashoorioon, Amjad; Casadio, Roberto; Geshnizjani, Ghazal
We demonstrate that in some regions of parameter space, modified dispersion relations can lead to highly populated excited states, which we dub as 'super-excited' states. In order to prepare such super-excited states, we invoke dispersion relations that have negative slope in an interim sub-horizon phase at high momenta. This behaviour of quantum fluctuations can lead to large corrections relative to the Bunch-Davies power spectrum, which mimics highly excited initial conditions. We identify the Bogolyubov coefficients that can yield these power spectra. In the course of this computation, we also point out the shortcomings of the gluing method for evaluating themore » power spectrum and the Bogolyubov coefficients. As we discuss, there are other regions of parameter space, where the power spectrum does not get modified. Therefore, modified dispersion relations can also lead to so-called 'calm excited states'. We conclude by commenting on the possibility of obtaining these modified dispersion relations within the Effective Field Theory of Inflation.« less
On condition evaluation of axle unit bearings of wheel pair
NASA Astrophysics Data System (ADS)
Glotov, V. V.; Romashchenko, M. A.; Ostroumov, I. V.; Kondratiev, Il V.
2018-03-01
At present, axle units of freight cars undergo a complete checkup with disassembling and visual inspection of the bearing parts every five years. During an annual interim checkup, external inspection of an axle box with removed cap is carried out and the lubricant condition is checked. The state of the rolling surfaces of bearings during an interim checkup should be assessed using the known methods of nondestructive testing.
IVHS Architecture Development Program, Interim Status Report
DOT National Transportation Integrated Search
1994-04-01
A MAJOR NATIONAL INITIATIVE IS UNDERWAY TO APPLY PROVEN INFORMATION, COMMUNICATIONS AND CONTROL TECHNOLOGIES TO SURFACE TRANSPORTATION TO IMPROVE ITS EFFICIENCY AND REDUCE ITS NEGATIVE IMPACTS. COLLECTIVELY, THESE APPLICATIONS ARE KNOWN AS INTELLIGEN...
The deep underground science and engineering laboratory at Homestake
NASA Astrophysics Data System (ADS)
Lesko, Kevin T.
2009-06-01
The US National Science Foundation and the US underground science community are well into the campaign to establish a world-class, multi-disciplinary deep underground science and engineering laboratory — DUSEL. The NSF's review committee, following the first two NSF solicitations, selected Homestake as the prime site to be developed into an international, multidisciplinary, world-class research facility. Homestake DUSEL will provide much needed underground research space to help relieve the worldwide shortage, particularly at great depth, and will develop research campuses at different depths to satisfy the research requirements for the coming decades. The State of South Dakota has demonstrated remarkable support for the project and has secured the site with the transfer of the former Homestake Gold Mine and has initiated re-entry and rehabilitation of the facility to host a modest interim science program with state funds and those from a substantial philanthropic donor. I review the scientific case for DUSEL and the progress in developing the preliminary design of DUSEL in Homestake and the initial suite of experiments to be funded along with the facility.
Critical Surface Cleaning and Verification Alternatives
NASA Technical Reports Server (NTRS)
Melton, Donald M.; McCool, A. (Technical Monitor)
2000-01-01
As a result of federal and state requirements, historical critical cleaning and verification solvents such as Freon 113, Freon TMC, and Trichloroethylene (TCE) are either highly regulated or no longer 0 C available. Interim replacements such as HCFC 225 have been qualified, however toxicity and future phase-out regulations necessitate long term solutions. The scope of this project was to qualify a safe and environmentally compliant LOX surface verification alternative to Freon 113, TCE and HCFC 225. The main effort was focused on initiating the evaluation and qualification of HCFC 225G as an alternate LOX verification solvent. The project was scoped in FY 99/00 to perform LOX compatibility, cleaning efficiency and qualification on flight hardware.
Shuttle/IUS performance for planetary missions. [Interim Upper Stage
NASA Technical Reports Server (NTRS)
Cork, M. J.; Driver, J. M.; Wright, J. L.
1975-01-01
Potential requirements for planetary missions in the 1980s, capabilities of the Interim Upper Stage (IUS) candidates to perform those missions, and Shuttle/IUS mission profile options for performance enhancement are examined. The most demanding planetary missions are the Pioneer Saturn/Uranus/Titan Probe and the Mariner-class orbiters of Mercury, Jupiter, and Saturn. Options available to designers of these missions will depend on the specific IUS selected for development and the programmatic phasing of the IUS and the NASA Tug. Use of Shuttle elliptic orbits as initial conditions for IUS ignition offers significant performance improvements; specific values are mission dependent.
ERIC Educational Resources Information Center
Greene-McIntyre, Mary; Finch, Mary Hayes; Searcy, John
2003-01-01
An Alabama initiative aimed to improve access to oral health care for Medicaid-eligible children through four components: improved Medicaid claims processing, increased reimbursement for providers, outreach and educational activities to support providers, and parent and patient education about children's oral health. In the first 3 program years,…
2014-03-19
This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.
Portland cement concrete pavement restoration : final summary report.
DOT National Transportation Integrated Search
1988-07-01
This final summary report is comprised of an Initial Construction Report; a Final Report; and two Interim Reports. These reports document the construction of Louisiana's Portland Cement Concrete Pavement Restoration project and its performance during...
Jointless bridges : interim report.
DOT National Transportation Integrated Search
1980-01-01
Presented is a summary of jointless bridge designs as twelve states; namely, California, Colorado, Idaho, Iowa, Kansas, Missouri, Nebraska, North Dakota, South Dakota, Tennessee, Virginia, and Wisconsin. Most of these states use some form of integral...
77 FR 15943 - United States-Korea Free Trade Agreement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-19
...This rule amends the Customs and Border Protection (CBP) regulations on an interim basis to implement the preferential tariff treatment and other customs-related provisions of the United States- Korea Free Trade Agreement.
An investigation of safety belt usage and effectiveness
DOT National Transportation Integrated Search
1975-03-01
This interim report contains primarily a theoretical discussion of problems of inference in studies on seat belt utilization and effectiveness. Seat belt effectiveness in accidents is initially discussed from a population paramenter point of, view. T...
Cyclone Activity in the Arctic From an Ensemble of Regional Climate Models (Arctic CORDEX)
NASA Astrophysics Data System (ADS)
Akperov, Mirseid; Rinke, Annette; Mokhov, Igor I.; Matthes, Heidrun; Semenov, Vladimir A.; Adakudlu, Muralidhar; Cassano, John; Christensen, Jens H.; Dembitskaya, Mariya A.; Dethloff, Klaus; Fettweis, Xavier; Glisan, Justin; Gutjahr, Oliver; Heinemann, Günther; Koenigk, Torben; Koldunov, Nikolay V.; Laprise, René; Mottram, Ruth; Nikiéma, Oumarou; Scinocca, John F.; Sein, Dmitry; Sobolowski, Stefan; Winger, Katja; Zhang, Wenxin
2018-03-01
The ability of state-of-the-art regional climate models to simulate cyclone activity in the Arctic is assessed based on an ensemble of 13 simulations from 11 models from the Arctic-CORDEX initiative. Some models employ large-scale spectral nudging techniques. Cyclone characteristics simulated by the ensemble are compared with the results forced by four reanalyses (ERA-Interim, National Centers for Environmental Prediction-Climate Forecast System Reanalysis, National Aeronautics and Space Administration-Modern-Era Retrospective analysis for Research and Applications Version 2, and Japan Meteorological Agency-Japanese 55-year reanalysis) in winter and summer for 1981-2010 period. In addition, we compare cyclone statistics between ERA-Interim and the Arctic System Reanalysis reanalyses for 2000-2010. Biases in cyclone frequency, intensity, and size over the Arctic are also quantified. Variations in cyclone frequency across the models are partly attributed to the differences in cyclone frequency over land. The variations across the models are largest for small and shallow cyclones for both seasons. A connection between biases in the zonal wind at 200 hPa and cyclone characteristics is found for both seasons. Most models underestimate zonal wind speed in both seasons, which likely leads to underestimation of cyclone mean depth and deep cyclone frequency in the Arctic. In general, the regional climate models are able to represent the spatial distribution of cyclone characteristics in the Arctic but models that employ large-scale spectral nudging show a better agreement with ERA-Interim reanalysis than the rest of the models. Trends also exhibit the benefits of nudging. Models with spectral nudging are able to reproduce the cyclone trends, whereas most of the nonnudged models fail to do so. However, the cyclone characteristics and trends are sensitive to the choice of nudged variables.
Evaluation of Searching and Rescue (SAR) Method For Determining Local Wind Current
1991-07-01
JUL 10 1992 ("= Research ajJ Development Centerto 1082 Shennecossett Road . - Groton, CT 06340-6096 INTERIM REPORT July 1991 This document is...United States Coast Guard Research and Development Center 1082 Shennecossett Road Groton, CT 06340-6096 V ’C . l •• mU. Technical Report Documentation...Grant No. 1082 Shennecossett Road Groton, Connecticut 06340-6096 13. Type of Report and Period Covered 12. Sponsoring Agency Name and Address INTERIM
20 CFR 416.1901 - Scope of subpart S.
Code of Federal Regulations, 2010 CFR
2010-04-01
... to the State (or a political subdivision of the State) as repayment for interim assistance it gave... you must have given written authorization for us to repay the State (or a political subdivision of the... State. (4) Appeals. Sections 416.1920 through 416.1922 describe your appeal rights in the State and in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-10
...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.
Langton, Jennifer; Crampton, Peter
2008-04-18
To determine whether the three main funding formulas for Primary Health Organisations achieved a stated aim of the Primary Health Care Strategy to fund enrolled populations according to need. National data were obtained from the Ministry of Health for a 12-month period beginning in April 2004: these included demographic characteristics of the enrolled Primary Health Organisation population, plus rates tables for: First-Contact Services, Services to Improve Access, and Health Promotion. Funding for Access and Interim practices for four-quarters was calculated for each of these three funding streams. Analysis of the demographic characteristics of Access and Interim practices was undertaken. Maori and Pacific peoples made up a greater proportion of the Access population than the Interim, had higher rates of deprivation than the non-Maori/non-Pacific population, and demonstrated a younger age distribution. The first quarter (April 2004-June 2004) showed there was preferential funding for Access PHOs and in particular high-needs groups. In quarter two, this level of preferential funding had diminished, coinciding with the introduction of increased government funding for all Interim enrolees aged 65 and over. The greater funding for Access enrolees was notably eroded with the introduction of Access-level funding for those aged 65+ in Interim PHOs. Since these data were analysed all remaining Interim age groups have shifted to Access-level funding, benefiting non-Maori /non-Pacific in Interim PHOs. The rapid shift to Access-level funding for First Contact Services has seen a continued erosion of the redistributive effect of the original needs-based formulas. A system cannot be considered equitable if some members of society are not realising their health potential, and financing of primary care should remain redistributive until such a time as this objective is attained.
Weber, M M
2002-11-01
In 1997 the Max Planck Society set up a presidential commission to do research on the historical development of its precursor organization, the Kaiser Wilhelm Society (KWG), during the Third Reich. This paper presents some of the important results given in the interim reports of this commission that are relevant to psychiatry. It focuses on brain research, anthropology, psychiatric genetics, and the role of the well-known biochemist Adolf Butenandt. In general, the interim reports reflect the numerous links between the biomedical research of the KWG and the institutions of the National Socialist (Nazi) state. However, they do not yet allow a final historical assessment as to the complex situation of this field of research during National Socialism.
The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124
DOE Office of Scientific and Technical Information (OSTI.GOV)
Voegele, Michael D.; Vieth, Donald
2013-07-01
The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should bemore » implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)« less
77 FR 72738 - Contracts and Provider Agreements for State Home Nursing Home Care
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-06
... State Home Nursing Home Care AGENCY: Department of Veterans Affairs. ACTION: Interim final rule. SUMMARY... into contracts or provider agreements with State homes for the nursing home care of certain disabled... submitted in response to ``RIN 2900-AO57--Contracts and Provider Agreements for State Home Nursing Home Care...
Final Report: Characterization of Canister Mockup Weld Residual Stresses
DOE Office of Scientific and Technical Information (OSTI.GOV)
Enos, David; Bryan, Charles R.
2016-12-01
Stress corrosion cracking (SCC) of interim storage containers has been indicated as a high priority data gap by the Department of Energy (DOE) (Hanson et al., 2012), the Electric Power Research Institute (EPRI, 2011), the Nuclear Waste Technical Review Board (NWTRB, 2010a), and the Nuclear Regulatory Commission (NRC, 2012a, 2012b). Uncertainties exist in terms of the environmental conditions that prevail on the surface of the storage containers, the stress state within the container walls associated both with weldments as well as within the base metal itself, and the electrochemical properties of the storage containers themselves. The goal of the workmore » described in this document is to determine the stress states that exists at various locations within a typical storage canister by evaluating the properties of a full-diameter cylindrical mockup of an interim storage canister. This mockup has been produced using the same manufacturing procedures as the majority of the fielded spent nuclear fuel interim storage canisters. This document describes the design and procurement of the mockup and the characterization of the stress state associated with various portions of the container. It also describes the cutting of the mockup into sections for further analyses, and a discussion of the potential impact of the results from the stress characterization effort.« less
ERIC Educational Resources Information Center
Nilsen, Sigurd R.
A study assessed whether the Department of Labor's (DOL's) information on states' Workforce Investment Act of 1998 (WIA) spending was a true reflection of states' available funds. The most recent available spending data from DOL and the 50 states were analyzed. Interviews were conducted with state workforce officials in nine states, local…
77 FR 16661 - Tuberculosis in Cattle and Bison; State and Zone Designations; NM; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
...-0124] Tuberculosis in Cattle and Bison; State and Zone Designations; NM; Correction AGENCY: Animal and... in the regulatory text of an interim rule that amended the bovine tuberculosis regulations by establishing two separate zones with different tuberculosis risk classifications for the State of New Mexico...
76 FR 61253 - Tuberculosis in Cattle and Bison; State and Zone Designations; Minnesota
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-04
.... APHIS-2011-0100] Tuberculosis in Cattle and Bison; State and Zone Designations; Minnesota AGENCY: Animal... are amending the bovine tuberculosis regulations regarding State and zone classifications by... for tuberculosis. DATES: This interim rule is effective October 4, 2011. We will consider all comments...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-29
... United States--Peru Trade Promotion Agreement (US-PERU TPA) AGENCY: International Trade [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The United States and Peru negotiated the US-Peru..., fabric, yarn, and fiber produced in Peru or the United States and traded between the two countries are...
Revised ground-water monitoring compliance plan for the 300 area process trenches
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schalla, R.; Aaberg, R.L.; Bates, D.J.
1988-09-01
This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less
Impact evaluation of Morgantown PRT 1975-1976 ridership: Interim Analysis
DOT National Transportation Integrated Search
1977-06-01
An analysis of the ridership levels of the Morgantown PRT system during its : initial period of operation, the 1975-1976 academic year, is presented. PRT ridership : by day, weekly ridership trends in terms of exogeneous events, the influence of : fe...
DOT National Transportation Integrated Search
1987-01-01
The report presents comparisons of initial evaluations of several concrete sealers and multiple layer polymer concrete overlays. The sealers evaluated included a solvent-dlspersed epoxy, a water-dlspersed epoxy, a silane, and a high molecular weight ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
...] Competitive and Noncompetitive Nonformula Federal Assistance Programs--Administrative Provisions for Biomass..., without change, an interim rule containing a set of specific administrative requirements for the Biomass... Biomass Research and Development Initiative (BRDI) under which competitively awarded grants, contracts...
40 CFR 142.22 - Review of State variances, exemptions and schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... (and schedules prescribed pursuant thereto) by the States with primary enforcement responsibility...
ERIC Educational Resources Information Center
Ruedel, Kristin; Nelson, Gena; Bailey, Tessie
2018-01-01
To evaluate interim progress toward the State-identified Measurable Result (SIMR), states require access to high-quality data from local education agencies (LEAs) and early intervention service providers. In a review of 2017 Phase III State Systemic Improvement Plans (SSIP), 43 Part C states noted limitations or concerns related to data and…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-01
... DEPARTMENT OF STATE 22 CFR Part 42 [Public Notice 7391] RIN 1400-AC86 Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended AGENCY: State Department. ACTION: Interim final rule. SUMMARY: This rule amends the Department of State's regulations relating to adoptions in...
1982-04-12
EPA regulations to protect human health and the environment from the improper management of hazardous waste were published in the Federal Register on May 19, 1980 (45 FR 33063). These regulations include provisions for authorization of State programs to operate in lieu of the Federal program. Today EPA is announcing the availability for public review of the Indiana application for Phase I Interim Authorization, inviting public comment, and giving notice of a public hearing to be held on the application.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-22
...EPA is making an interim final determination to stay the imposition of offset sanctions and to defer the imposition of highway sanctions based on a proposed approval of a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP) published elsewhere in this Federal Register. The SIP revision concerns two permitting rules submitted by the PCAPCD and FRAQMD, respectively: Rule 502, New Source Review, and Rule 10.1, New Source Review.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... Feasibility study means the pro forma financial analysis performed by RUS to determine the economic... RUS to the borrower's construction fund. Borrower means any organization which has an outstanding loan... percent per year. Initial loan means the first loan made to a borrower. Interim construction means the...
Code of Federal Regulations, 2014 CFR
2014-01-01
.... Feasibility study means the pro forma financial analysis performed by RUS to determine the economic... RUS to the borrower's construction fund. Borrower means any organization which has an outstanding loan... percent per year. Initial loan means the first loan made to a borrower. Interim construction means the...
Code of Federal Regulations, 2013 CFR
2013-01-01
.... Feasibility study means the pro forma financial analysis performed by RUS to determine the economic... RUS to the borrower's construction fund. Borrower means any organization which has an outstanding loan... percent per year. Initial loan means the first loan made to a borrower. Interim construction means the...
Code of Federal Regulations, 2012 CFR
2012-01-01
.... Feasibility study means the pro forma financial analysis performed by RUS to determine the economic... RUS to the borrower's construction fund. Borrower means any organization which has an outstanding loan... percent per year. Initial loan means the first loan made to a borrower. Interim construction means the...
Code of Federal Regulations, 2011 CFR
2011-01-01
.... Feasibility study means the pro forma financial analysis performed by RUS to determine the economic... RUS to the borrower's construction fund. Borrower means any organization which has an outstanding loan... percent per year. Initial loan means the first loan made to a borrower. Interim construction means the...
Refinement of moisture calibration curves for nuclear gage : interim report no. 1.
DOT National Transportation Integrated Search
1972-01-01
This study was initiated to determine the correct moisture calibration curves for different nuclear gages. It was found that the Troxler Model 227 had a linear response between count ratio and moisture content. Also, the two calibration curves for th...
DOT National Transportation Integrated Search
1999-06-01
The main purpose of Phase I of this project was to develop a methodology for predicting consequences of hazardous material (HM) crashes, such as injuries and property damage. An initial step in developing a risk assessment is to reliably estimate the...
An Interim Update to the 2035 Socioeconomic and Travel Demand Forecasts for Virginia
DOT National Transportation Integrated Search
2012-10-01
In support of the update to Virginias 2035 Statewide Multimodal Plan, this report provides an update to select : socioeconomic forecasts initially made in 2009 based on a review of data from national sources and the literature. Mobility : needs ex...
An interim update to the 2035 socioeconomic and travel demand forecasts for Virginia.
DOT National Transportation Integrated Search
2012-09-01
"In support of the update to Virginias 2035 Statewide Multimodal Plan, this report provides an update to select : socioeconomic forecasts initially made in 2009 based on a review of data from national sources and the literature. Mobility : needs e...
An interim update to the 2035 socioeconomic and travel demand forecasts for Virginia.
DOT National Transportation Integrated Search
2012-10-01
In support of the update to Virginias 2035 Statewide Multimodal Plan, this report provides an update to select : socioeconomic forecasts initially made in 2009 based on a review of data from national sources and the literature. Mobility : needs ex...
Interim Draft: Biological Sampling and Analysis Plan Outline ...
Standard Operation Procedures This interim sampling and analysis plan (SAP) outline was developed specifically as an outline of the output that will be generated by a developing on-line tool called the MicroSAP. The goal of the MicroSAP tool is to assist users with development of SAPs needed for site characterization, verification sampling, and post decontamination sampling stages of biological sampling and analysis activities in which the EPA would be responsible for conducting sampling. These activities could include sampling and analysis for a biological contamination incident, a research study, or an exercise. The development of this SAP outline did not consider the initial response of an incident, as it is assumed that the initial response would have been previously completed by another agency during the response, or the clearance phase, as it is assumed that separate committee would be established to make decisions regarding clearing a site. This outline also includes considerations for capturing the associated data quality objectives in the SAP.
Proficiency Guidance on New State Summative Assessments from NWEA
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2015
2015-01-01
Measures of Academic Progress® (MAP®) computer adaptive interim assessments serve many purposes, from informing instruction to identifying students for intervention to projecting proficiency on state accountability assessments. To make sure its flagship product does the latter, Northwest Evaluation Association™ (NWEA™) routinely conducts studies…
77 FR 4674 - State Fiscal Stabilization Fund Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... and competing priorities that States were facing in meeting the SFSF data collection and reporting... the interim final requirement (i.e., the notice of proposed revisions to certain data collection and... collection instructions; respondents can provide the requested data in the desired format; reporting burden...
DOT National Transportation Integrated Search
1995-05-01
KEYWORDS : ADVANCED VEHICLE CONTROL & SAFETY SYSTEMS OR AVCSS, COLLISION WARNING/AVOIDANCE SYSTEMS, CRASH REDUCTION, INTELLIGENT VEHICLE INITIATIVE OR IVI : RESULTS FROM THE TESTING OF ELEVEN COLLISION AVOIDANCE SYSTEMS (CAS) FOR LANE CHANGE, ...
Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.
Day, Roger S
2010-02-01
In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.
Federal enforcement in group and individual health insurance markets. Final rule.
2005-11-25
This rule makes final an interim final rule that details procedures we use for enforcing title XXVII of the Public Health Service Act as added by the Health Insurance Portability and Accountability Act of 1996, and as amended by the Mental Health Parity Act of 1996, the Newborns' and Mothers' Health Protection Act of 1996, and the Women's Health and Cancer Rights Act of 1998. Specifically, we are responsible for enforcing title XXVII requirements in States that do not enact the legislation necessary to enforce those requirements, or otherwise fail to substantially enforce the requirements. We are also responsible for taking enforcement actions against non-Federal governmental plans. The regulation describes the process we use in both enforcement contexts. This final rule deletes an appendix to the interim rule that listed examples of violations of title XXVII and corrects the description of a cross-reference, but makes no substantive changes to the interim final rule.
Compulsory license for cable systems--Copyright Office, Library of Congress. Interim regulations.
1982-05-20
This notice is issued to inform the public that the Copyright Office of the Library of Congress is adopting interim amendments to 201.11 and 201.17 as amended on June 27, 1978 and July 3, 1980 respectively. These regulations implement portions of section 111 of the Copyright Act of 1976, title 17 of the United States Code. That section prescribes conditions under which cable systems may obtain a compulsory license to retransmit copyrighted works, including the filing of Notices of Identity and Signal Carriage Complement and Statements of Account, and the submission of statutory royalty fees. The effect of the amendments is to modify the filing requirements and royalty fee calculations necessitated by changes in the rules and regulations of the Federal Communications Commission. The amendments are issued on an interim basis in order to permit their immediate application while allowing full public comment.
77 FR 31724 - Exchange Visitor Program-Summer Work Travel; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-30
... DEPARTMENT OF STATE 22 CFR Part 62 RIN 1400-AD14 [Public Notice 7902] Exchange Visitor Program--Summer Work Travel; Correction AGENCY: Department of State. ACTION: Interim final rule; correction SUMMARY: This document contains minor corrections to the Exchange Visitor Program--Summer Work Travel...
40 CFR 52.2223 - Compliance schedules.
Code of Federal Regulations, 2011 CFR
2011-07-01
... interim emission limitations on the date prescribed in the Tennessee air pollution control regulation... not meeting the requirements of Subpart N of this chapter. All regulations cited are air pollution control regulations of the State or those of a local air pollution control agency as noted. (1) State...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
... testing of interim versions of the model with air districts and Metropolitan Planning Organizations (MPOs... Motor Vehicle Emission Factor Model for Use in the State of California AGENCY: Environmental Protection... of the latest version of the California EMFAC model (short for EMission FACtor) for use in state...
Wide-bandwidth high-resolution search for extraterrestrial intelligence
NASA Technical Reports Server (NTRS)
Horowitz, Paul
1992-01-01
This interim report summarizes the research accomplished during the initial 6-month period of the grant. Activities associated with antenna configurations, the channelizing downconverter, the fast Fourier transform array, the DSP (digital signal processing) array, and the backend and UNIX workstation are discussed. Publications submitted during the reporting period are listed.
76 FR 72559 - Enhancements to Emergency Preparedness Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-23
... allow the assignment of the on-shift health physics technician (HP Tech.) as the interim operations... public health and safety. These modifications were issued to licensees by NRC Order EA-02-026, ``Order... health and safety through improvements in the response to unlikely initiating events that could lead to...
2012-07-01
on the cleanup of specific sites: those containing only cesium-137 (Goiania) and those containing 137Cs and other radionuclides ( Chernobyl ...targets and consider initiatives to enhance the quality of life of the residents of the contaminated areas. Recovery experience from the Chernobyl
Protocol for determining bull trout presence
James Peterson; Jason B. Dunham; Philip Howell; Russell Thurow; Scott Bonar
2002-01-01
The Western Division of the American Fisheries Society was requested to develop protocols for determining presence/absence and potential habitat suitability for bull trout. The general approach adopted is similar to the process for the marbled murrelet, whereby interim guidelines are initially used, and the protocols are subsequently refined as data are collected....
24 CFR 266.602 - Mortgage insurance premium: Insured advances.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Mortgage insurance premium: Insured... Contract Rights and Obligations Mortgage Insurance Premiums § 266.602 Mortgage insurance premium: Insured.... On each anniversary of the initial closing, the HFA shall pay an interim mortgage insurance premium...
24 CFR 266.602 - Mortgage insurance premium: Insured advances.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Mortgage insurance premium: Insured... Contract Rights and Obligations Mortgage Insurance Premiums § 266.602 Mortgage insurance premium: Insured.... On each anniversary of the initial closing, the HFA shall pay an interim mortgage insurance premium...
DOT National Transportation Integrated Search
1982-01-01
The installation of a thin polymer concrete overlay on the Beulah Road bridge demonstrates that an overlay of low permeability and high skid resistance can be successfully installed by maintenance forces with a minimum of disruption to traffic, appro...
75 FR 76781 - Reports, Forms, and Record Keeping Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-09
...) Whether the proposed collection of information is necessary for the proper performance of the functions of... to the implementation of the intervention and after its conclusion. Interim survey waves may also be... differences between an initial baseline survey wave and a later survey wave were associated with an...
DOT National Transportation Integrated Search
2000-01-01
The Ohio Department of Transportation (ODOT) currently uses density and moisture measured with a nuclear density gauge as the principal criteria for approving subgrade construction in Ohio. This procedure is time consuming, thereby restricting the nu...
42 CFR 413.64 - Payments to providers: Specific rules.
Code of Federal Regulations, 2014 CFR
2014-10-01
... small as possible. (c) Interim payments during initial reporting period. At the beginning of the program... experienced a temporary delay in preparing and submitting bills to the contractor beyond its normal billing.... Recovery of the accelerated payment may be made by recoupment as provider bills are processed or by direct...
DOT National Transportation Integrated Search
1973-09-01
Two sections of Interstate 10 have been selected for study to determine the initial roughness and subsequent change in roughness with time. The two sections represent different design and construction procedures. : Section 1 is located on I-10 betwee...
Used fuel extended storage security and safeguards by design roadmap
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durbin, Samuel G.; Lindgren, Eric Richard; Jones, Robert
2016-05-01
In the United States, spent nuclear fuel (SNF) is safely and securely stored in spent fuel pools and dry storage casks. The available capacity in spent fuel pools across the nuclear fleet has nearly reached a steady state value. The excess SNF continues to be loaded in dry storage casks. Fuel is expected to remain in dry storage for periods beyond the initial dry cask certification period of 20 years. Recent licensing renewals have approved an additional 40 years. This report identifies the current requirements and evaluation techniques associated with the safeguards and security of SNF dry cask storage. Amore » set of knowledge gaps is identified in the current approaches. Finally, this roadmap identifies known knowledge gaps and provides a research path to deliver the tools and models needed to close the gaps and allow the optimization of the security and safeguards approaches for an interim spent fuel facility over the lifetime of the storage site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truex, Michael J.; Oostrom, Martinus; Strickland, Christopher E.
2013-09-01
A field test of desiccation is being conducted as an element of the deep vadose zone treatability test program. Desiccation technology relies on removal of water from a portion of the subsurface such that the resultant low moisture conditions inhibit downward movement of water and dissolved contaminants. Previously, a field test report (Truex et al. 2012a) was prepared describing the active desiccation portion of the test and initial post-desiccation monitoring data. Additional monitoring data have been collected at the field test site during the post-desiccation period and is reported herein along with interpretation with respect to desiccation performance. This ismore » an interim report including about 2 years of post-desiccation monitoring data.« less
77 FR 39112 - State Official Notification Rule
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... BUREAU OF CONSUMER FINANCIAL PROTECTION 12 CFR Part 1082 [Docket No. CFPB-2011-0005] RIN 3170-AA02... the SUPPLEMENTARY INFORMATION. V. Section-by-Section Summary Section 1082.1(a) Notice Requirement Section 1082.1(a) of the Interim Final Rule sets out the timing and process for notice by State Officials...
22 CFR 102.13 - Protective services with respect to deceased victims of accidents.
Code of Federal Regulations, 2011 CFR
2011-04-01
... victims of accidents. 102.13 Section 102.13 Foreign Relations DEPARTMENT OF STATE ECONOMIC AND OTHER FUNCTIONS CIVIL AVIATION United States Aircraft Accidents Abroad § 102.13 Protective services with respect to deceased victims of accidents. (a) Interim disposition of remains. Generally, local authorities...
22 CFR 102.13 - Protective services with respect to deceased victims of accidents.
Code of Federal Regulations, 2010 CFR
2010-04-01
... victims of accidents. 102.13 Section 102.13 Foreign Relations DEPARTMENT OF STATE ECONOMIC AND OTHER FUNCTIONS CIVIL AVIATION United States Aircraft Accidents Abroad § 102.13 Protective services with respect to deceased victims of accidents. (a) Interim disposition of remains. Generally, local authorities...
77 FR 62596 - Interim Guidance on State Freight Plans and State Freight Advisory Committees
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-15
...), Maritime Administration (MARAD), Pipeline and Hazardous Materials Safety Administration (PHSMA), Research... Research Program (23 U.S.C. 505). They may also use carryover balances from National Highway System funds... system's users and to the general public (for example, reductions in crashes, fatalities, and injuries...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-15
... United States-Colombia Trade Promotion Agreement (U.S.-Colombia TPA) AGENCY: International Trade...-Colombia Trade Promotion Agreement Implementation Act (the ``Act'') [Pub. L. 112-42] implements the commercial availability provision provided for in Article 3.3 of the United States-Colombia Trade Promotion...
Harmon, Rachael E; Boulmay, Brian C
2011-01-01
Oncology services at Charity Hospital were discontinued following Hurricane Katrina in August 2005. Medical oncology and chemotherapy services resumed at the Louisiana State University Interim Public Hospital in 2007. Demographic, clinical, and displacement data of the re-established patient cohort were reviewed. Patients evaluated in the Louisiana State University Health Sciences Center (LSUHSC) Oncology Clinics from September 1, 2007, to August 31, 2009, were identified and data collected included time from diagnosis of malignancy to initial oncology evaluation, insurance status, percentage displaced for six months or more due to Hurricane Katrina, ethnicity, referrals for radiation oncology, and the number of outpatient clinical encounters (OCE). 464 patients were evaluated in the study time period. Sixty-five percent of the patients had new cancer diagnoses and 35% re-established cancer care in the Charity System and a substantial proportion were either unfunded or had Medicaid coverage. Thirty-four percent were confirmed to be displaced from New Orleans for greater than six months and the majority of patients were black. The majority of new cancer diagnoses were breast, lung, and colon cancer. Human immunodeficiency virus (HIV) positive patients made up 7.5% of the patient cohort. There was a 70% decline in patient volumes following Hurricane Katrina. Oncology services for a minority-based, underinsured patient population were severely impacted by Hurricane Katrina. Following the storm, persistent systemwide resource limitations led to suboptimal timeliness of medical oncology evaluations. Health care systems serving underinsured patients require a disaster plan to minimize interruption of oncology care. Our experience illustrates the need for resources to ensure rapid re-establishment of care for economically disadvantaged patients following natural disasters.
Toward a Nation-Building Operating Concept
2010-04-13
of United Nations intervention in Timor, argues that an interim protectorate is useful only if implemented by a multi -national coalition. However...to a franchise agreement or venture capital investment. The United States provides capital and expertise to indigenous group predicated on agreed...Toward a Nation-Building Operating Concept by Colonel John DeJarnette United States Army School of Advanced Military Studies United States
International Business Machines (IBM) Corporation Interim Agreement EPA Case No. 08-0113-00
On March 27, 2008, the United States Environmental Protection Agency (EPA), suspended International Business Machines (IBM) from receiving Federal Contracts, approved subcontracts, assistance, loans and other benefits.
Interim Procedures Safeguarding Mobile Devices during International Travel
This procedure is for safeguarding EPA information and systems for all employees, contractors, and other users while on international travel or to specifically designated locations within the United States and foreign embassies.
The Decanal Divide: Women in Decanal Roles at U.S. Medical Schools.
Schor, Nina F
2018-02-01
To test the hypotheses that women in medical school dean-level (decanal) positions occupy lower-rank and more image- and education-focused positions than men, and that state and woman-led schools have more women in decanal positions. Data were collected on September 10-18, 2016, from Web sites of 136 allopathic, U.S. medical schools accredited by the Liaison Committee on Medical Education and represented on the roster of accredited MD programs in the United States with full accreditation as of June 22, 2016. Statistical significance of differences between comparison groups was assessed using Student t test with P < .05 indicating significance. Correlation between parameters was determined by Spearman rank correlation test with P < .05 indicating significant correlation. Findings demonstrate that only 15% (22/149) of deans and interim deans are women, and the prevalence of women in decanal positions decreases with ascending professional rank (R = 0.93; P < .05). Women are most prevalent in decanal positions focusing on education and mentoring or institutional public image and least prevalent in those focusing on corporate strategy and policy, finance, or government relations. Schools with a woman as dean or interim dean have a higher percentage of decanal positions occupied by women than those with a man as dean or interim dean (P < .05). State and private medical schools do not differ from one another in this regard. Gender stereotypes and models appear to continue to drive the number and roles of women in decanal positions.
Analysis of Transportation Options for Commercial Spent Fuel in the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalinina, Elena; Busch, Ingrid Karin
The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less
Evaluation of the HOPE Act: New State Services for Street Youth. Interim Report.
ERIC Educational Resources Information Center
McLain, Barbara
This report reviews the effectiveness of Washington's HOPE Centers and Responsible Living Skills Programs (RLSPs) and reports findings and recommendations. In 1999, state legislators enacted the HOPE Act, which created these two services. HOPE Centers are temporary residential facilities where street youth can stay for 30 days while being…
DOT National Transportation Integrated Search
2008-12-01
Maine has 13,200 miles of picturesque snowmobile trails that cover the entire state from Aroostook : County in the north to York County in the south. Tourists have been traveling to the state to enjoy the : well groomed trails and warm greetings for ...
ERIC Educational Resources Information Center
Le Floch, Kerstin Carlson; Martinez, Felipe; O'Day, Jennifer; Stecher, Brian; Taylor, James; Cook, Andrea
2007-01-01
This report presents findings about accountability from two longitudinal studies, the National Longitudinal Study of "No Child Left Behind" (NLS-"NCLB"), and the Study of State Implementation of Accountability and Teacher Quality Under "No Child Left Behind" (SSI-"NCLB"). The research teams for these two…
DOT National Transportation Integrated Search
1982-02-01
This interim report presents an annotated bibliography that has been compiled as part of a comprehensive review of the state-of-the-art in the prediction and control of groundborne noise and vibration created by rail transit operations. Included in t...
77 FR 13952 - Federal Acquisition Regulation; United States-Korea Free Trade Agreement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-07
...DoD, GSA, and NASA are issuing an interim rule amending the Federal Acquisition Regulation (FAR) to implement the United States- Korea Free Trade Agreement. The Republic of Korea is already party to the World Trade Organization Government Procurement Agreement, but this trade agreement implements a lower procurement threshold.
Testing Prepares Students to Learn Better: The Forward Effect of Testing in Category Learning
ERIC Educational Resources Information Center
Lee, Hee Seung; Ahn, Dahwi
2018-01-01
The forward effect of testing occurs when testing on previously studied information facilitates subsequent learning. The present research investigated whether interim testing on initially studied materials enhances the learning of new materials in category learning and examined the metacognitive judgments of such learning. Across the 4…
Upward Bound Math-Science: Program Description and Interim Impact Estimates
ERIC Educational Resources Information Center
Olsen, Robert; Seftor, Neil; Silva, Tim; Myers, David; DesRoches, David; Young, Julie
2007-01-01
To help address continuing disparities in academic achievement and under-representation of disadvantaged groups in math and science majors and careers, the U.S. Department of Education (ED) established a math and science initiative in 1990 within Upward Bound, a federal grant program known as Upward Bound Math-Science (UBMS) designed to provide…
DOT National Transportation Integrated Search
1984-01-01
The installation of a thin polymer concrete overlay on the Big Swan Creek Bridge provides further evidence that an overlay of low permeability can be soundly bonded to a concrete bridge deck by maintenance forces with a minimum of disruption to traff...
ERIC Educational Resources Information Center
O'Regan, Fred; Conway, Maureen
The Aspen Institute's ongoing action-research program, Local Employment Approaches for the Disadvantaged (LEAD), assessed 60 programs nationally. Local initiatives fell into four general categories, with numerous subcategories: self-employment, job training and placement, job creation and retention, and community-based finance. A second breakdown…
DOT National Transportation Integrated Search
1999-06-01
Four bridge decks were overlayed and patched and one bridge pier was patched using concrete with and without corrosion inhibiting admixtures. Some concrete surfaces received topically applied corrosion-inhibiting treatments prior to placement of the ...
DOT National Transportation Integrated Search
1979-01-01
The report describes the initial phase of a two-phase project on the visual, on-the-road detection of driving while intoxicated (DWI). The purpose of the overall project is to develop and test procedures for enhancing on-the-road detection of DWI. Th...
Space Communications Capability Roadmap Interim Review
NASA Technical Reports Server (NTRS)
Spearing, Robert; Regan, Michael
2005-01-01
Contents include the following: Identify the need for a robust communications and navigation architecture for the success of exploration and science missions. Describe an approach for specifying architecture alternatives and analyzing them. Establish a top level architecture based on a network of networks. Identify key enabling technologies. Synthesize capability, architecture and technology into an initial capability roadmap.
Progress Report 2013. Turnaround Arts Initiative
ERIC Educational Resources Information Center
Stoelinga, Sara Ray; Joyce, Katie; Silk, Yael
2013-01-01
This interim progress report provides a look at Turnaround Arts schools in their first year, including: (1) a summary of the evaluation design and research questions; (2) a preliminary description of strategies used to introduce the arts in Turnaround Arts schools; and (3) a summary of school reform indicators and student achievement data at…
Tier One Performance Screen Initial Operational Test and Evaluation: 2011 Interim Report
2012-04-01
Alexandria, Virginia 22314 8 . PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) U. S. Army Research...DISTRIBUTION OF MOS IN THE FULL SCHOOLHOUSE DATA FILE ............ 8 TABLE 2.3. BACKGROUND AND DEMOGRAPHIC CHARACTERISTICS OF THE TOPS SAMPLES...SCHOOLHOUSE SAMPLE ....................................................................................................................B-6 TABLE B. 8
Code of Federal Regulations, 2010 CFR
2010-10-01
... certification pursuant to § 0.459 of this chapter. (b) Initial certification window. Following the effective... window for digital output protection technologies or recording methods. Within thirty (30) days after the... certification window, the Commission shall issue a public notice identifying the certifications received and...
"Winsight"™ Assessment System: Preliminary Theory of Action. Research Report. ETS RR-17-26
ERIC Educational Resources Information Center
Wylie, E. Caroline
2017-01-01
The "Winsight"™Assessment System integrates summative, interim (including both benchmark assessments and testlets), and formative assessment components initially focused on mathematics and English language arts (ELA) in Grades 3-8 and high school.This report provides a preliminary theory of action for the Winsight Assessment System. A…
Why Did Principals and Teachers Respond Differently to Curriculum Reform?
ERIC Educational Resources Information Center
Ng, Shun Wing
2009-01-01
This article presents the finding of an interim evaluation survey commissioned by the Education Bureau of Hong Kong on the effectiveness of the curriculum reform initiated in 2001. Drawing upon change theories for analysis of the study, the article examines the perceptions of both principals and teachers on the effectiveness of short-term…
40 CFR 24.02 - Issuance of initial orders; definition of final orders and orders on consent.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS... following a final decision by the Regional Administrator, or after thirty days from issuance if no hearing... in these procedures to the Regional Administrator shall be understood to be to the Assistant...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-28
..., one of which included the ``use of certified EHR technology in a meaningful manner.'' This means that... comments received by ONC related to the Interim Final Rule. In some cases, due to the simultaneous... or eligible hospital would be required to use adopted standards. One commenter specifically requested...
14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.
Code of Federal Regulations, 2011 CFR
2011-01-01
... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the sponsor...) Within twelve months of the release of the final aircraft data package by the aircraft manufacturer, but... apply for initial qualification in accordance with § 60.15 based on the final aircraft data package...
14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.
Code of Federal Regulations, 2014 CFR
2014-01-01
... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the sponsor...) Within twelve months of the release of the final aircraft data package by the aircraft manufacturer, but... apply for initial qualification in accordance with § 60.15 based on the final aircraft data package...
14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.
Code of Federal Regulations, 2010 CFR
2010-01-01
... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the sponsor...) Within twelve months of the release of the final aircraft data package by the aircraft manufacturer, but... apply for initial qualification in accordance with § 60.15 based on the final aircraft data package...
14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.
Code of Federal Regulations, 2013 CFR
2013-01-01
... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the sponsor...) Within twelve months of the release of the final aircraft data package by the aircraft manufacturer, but... apply for initial qualification in accordance with § 60.15 based on the final aircraft data package...
14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.
Code of Federal Regulations, 2012 CFR
2012-01-01
... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the sponsor...) Within twelve months of the release of the final aircraft data package by the aircraft manufacturer, but... apply for initial qualification in accordance with § 60.15 based on the final aircraft data package...
Tribal child welfare. Interim final rule.
2012-01-06
The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.
Interim Enforcement Program Response Guidance to Public Data Access Issues
Written to assist EPA and states when the ECHO web site was launched, this document provides guidance on questions that can arise when compliance and enforcement data are made available to the public.
Interim Enhanced Surface Water Treatment Rule Documents
The IESWTR balances the need for treatment with potential increases in disinfection by -products. The materials found on this page are intended to assist public water systems and state in the implementation of the IESWTR.
Tolerable movement criteria for highway bridges, volume I : interim report.
DOT National Transportation Integrated Search
1982-09-01
"The design procedure presented considers both strength and serviceability criteria. The procedure involves designing a bridge assuming no settlement will take place, using the American Association of State Highway and Transportation Officials workin...
2010-08-06
This interim final rule establishes requirements and procedures for implementation of TRICARE Retired Reserve. This interim final rule addresses provisions of the National Defense Authorization Act for Fiscal Year 2010 (NDAA-10). The purpose of this interim final rule is to establish the TRICARE Retired Reserve program that implements section 705 of the NDAA-10. Section 705 allows members of the Retired Reserve who are qualified for non-regular retirement, but are not yet 60 years of age, to qualify to purchase medical coverage equivalent to the TRICARE Standard (and Extra) benefit unless that member is either enrolled in, or is eligible to enroll in, a health benefit plan under Chapter 89 of Title 5, United States Code, as well as certain survivors. The amount of the premium that qualified members pay to purchase these benefits will represent the full cost as determined on an appropriate actuarial basis for coverage under the TRICARE Standard (and Extra) benefit including the cost of the program administration. There will be one premium for member-only coverage and a separate premium for member and family coverage. The rules and procedures otherwise outlined in Part 199 of 32 CFR relating to the operation and administration of the TRICARE Standard and Extra programs including the required cost-shares, deductibles and catastrophic caps for retired members and their dependents will apply to this program. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.
ERIC Educational Resources Information Center
National Academy of Sciences - National Research Council, Washington, DC. Office of International Affairs.
This study was conducted to provide the U.S. Department of State with an assessment of the potential impacts on science of a United States withdrawal from UNESCO and to suggest possible alternative arrangements to maintain essential U.S. scientific contacts with UNESCO-sponsored programs in case the United States were no longer a member of UNESCO…
ERIC Educational Resources Information Center
Day, Philip R., Jr.
Under the auspices of the North American Free Trade Agreement, five states in the United States and six states in Mexico established the Gulf of Mexico Accord to create a working partnership to foster economic development in the Gulf of Mexico. The agreement addresses six major sectors: investment; communication and transportation; health;…
NASA Astrophysics Data System (ADS)
Fortkamp, Jonathan C.
Current needs in the nuclear industry and movements in the political arena indicate that authorization may soon be given for development of a federal interim storage facility for spent nuclear fuel. The initial stages of the design work have already begun within the Department of Energy and are being reviewed by the Nuclear Regulatory Commission. This dissertation addresses the radiation environment around an interim spent nuclear fuel storage facility. Specifically the dissertation characterizes the radiation dose rates around the facility based on a design basis source term, evaluates the changes in dose due to varying cask spacing configurations, and uses these results to define some applicable health physics principles for the storage facility. Results indicate that dose rates from the facility are due primarily from photons from the spent fuel and Co-60 activation in the fuel assemblies. In the modeled cask system, skyshine was a significant contribution to dose rates at distances from the cask array, but this contribution can be reduced with an alternate cask venting system. With the application of appropriate health physics principles, occupation doses can be easily maintained far below regulatory limits and maintained ALARA.
76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...
ERIC Educational Resources Information Center
Chia, Magda Y.
2014-01-01
The Smarter Balanced Assessment Consortium (Smarter Balanced) serves over 19 million primary, middle, and high school students from across 26 states and affiliates (Smarter Balanced, n.d). As one of the two Race to the Top (RTT)-funded assessment consortia, Smarter Balanced is responsible for developing formative, interim, and summative…
Linking the New York State NYSTP Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. Recently, NWEA completed a concordance study to connect the scales of the New York State Testing Program (NYSTP) reading and math with those of the MAP…
ERIC Educational Resources Information Center
Hawkins, Evelyn K.; And Others
The Evaluation of Worker Profiling and Reemployment Services (WPRS) systems was designed to provide the U.S. Department of Labor information on how states are designing, implementing, and operating their worker profiling and reemployment services systems for dislocated workers and to compare the effectiveness of different state approaches to…
76 FR 28885 - Brucellosis in Swine; Add Texas to List of Validated Brucellosis-Free States
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-19
... movement of breeding swine from Texas. DATES: This interim rule is effective on May 19, 2011. We will..., bison, and swine, but goats, sheep, horses, and even humans are susceptible. In its principal animal... analysis. Breeding swine originating from a validated brucellosis-free State or herd may be moved...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
... circumstances and, in such cases, the State process must provide notice of the decision as expeditiously as... by the Secretary of Labor. Similarly, with respect to internal claims and appeals processes for... incorporate additional consumer protections so that the State process will continue to apply after the end of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... 2008 National Defense Authorization Act. V Trade Agreements--Costa Rica, Oman, and Peru. 2008-036..., Oman, and Peru (FAR Case 2008- 036) The Councils have adopted as final, without change, an interim rule... United States-Oman Free Trade Agreement, and the United States-Peru Trade Promotion Agreement. This final...
77 FR 56739 - Federal Acquisition Regulation; United States-Korea Free Trade Agreement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-13
...DoD, GSA, and NASA are adopting as final, without change, an interim rule amending the Federal Acquisition Regulation (FAR) to implement the United States-Korea Free Trade Agreement. The Republic of Korea is already party to the World Trade Organization Government Procurement Agreement, but this trade agreement implements a lower procurement threshold.
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
SFA Ombudsman Serving Students. Interim Report, September 1999 to March 2000.
ERIC Educational Resources Information Center
Department of Education, Washington, DC. Student Financial Assistance.
This 6-page pamphlet shares what the Student Financial Assistance (SFA) Office of the Ombudsman has learned from cases it has handled. An initial section offers information on the case management process, noting that the ombudsman process depends on the case's complexity and that many are revolved quickly. Next, it examines customer-reported case…
ERIC Educational Resources Information Center
Sipes, Laurel; Ruiz de Velasco, Jorge
2017-01-01
San Francisco's Mission Promise Neighborhood (MPN) is a federally-funded Promise Neighborhood initiative that supports community-based organizations, schools, and other public agencies to work in defined neighborhoods and build integrated supports for children and youth from cradle to college and career. Since 2013, the Gardner Center has…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-20
... (DFARS) to clarify rules of origin under trade agreements for photovoltaic devices to be utilized under.... 111-383) addresses the origin of photovoltaic devices purchased by a contractor under an energy... country of origin. DoD initially implemented this statute through an interim rule (DFARS Case 2011-D046...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... between an initial baseline survey wave and a later survey wave were associated with an intervening... add one or more interim survey waves. NHTSA currently has an approved inventory of 164,800 10-minute... information is necessary for the proper performance of the functions of the Department of Transportation...
ERIC Educational Resources Information Center
Raasch, Albert
1978-01-01
The project "Threshold Level," initiated by the Council of Europe in 1976, is compared with "Francais fondamental," comparing their aims and their differences. Offered as an interim statement, the article leaves open the question of whether Francais fondamental should be replaced by the the Threshold Level. (IFS/WGA)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...
Evaluation of rubber-asphalt chip seal in Oregon : interim report.
DOT National Transportation Integrated Search
1977-05-01
The Oregon State Highway Division, in cooperation with the Federal Highway Administration, participated in a demonstration project on the evaluation of rubber-asphalt chip seals. The trial projects were placed in Maintenance District 11, in the vicin...
Implementation of the AASHTO mechanistic-empirical pavement design guide for Colorado.
DOT National Transportation Integrated Search
2000-01-01
The objective of this project was to integrate the American Association of State Highway and Transportation Officials (AASHTO) Mechanistic-Empirical Pavement Design Guide, Interim Edition: A Manual of Practice and its accompanying software into the d...
Lau, Ting Ting; Leong, Wenyan; Peck, Yvonne; Su, Kai; Wang, Dong-An
2015-01-01
The fabrication of three-dimensional (3D) constructs relies heavily on the use of biomaterial-based scaffolds. These are required as mechanical supports as well as to translate two-dimensional cultures to 3D cultures for clinical applications. Regardless of the choice of scaffold, timely degradation of scaffolds is difficult to achieve and undegraded scaffold material can lead to interference in further tissue development or morphogenesis. In cartilage tissue engineering, hydrogel is the highly preferred scaffold material as it shares many similar characteristics with native cartilaginous matrix. Hence, we employed gelatin microspheres as porogens to create a microcavitary alginate hydrogel as an interim scaffold to facilitate initial chondrocyte 3D culture and to establish a final scaffold-free living hyaline cartilaginous graft (LhCG) for cartilage tissue engineering.
McLaren, Edward A
2013-09-01
As the economy has receded in recent years, many patients have been inclined to reject dental treatment beyond what they feel is the minimal amount necessary. Increasingly, there has been reluctance to take on the expense of full-mouth restorations and time-consuming procedures. Consequently, clinicians can benefit from innovative, conservative, interim solutions that enable them to provide segment treatment with long-term stability and esthetics, with lower initial cost. The bonded functional esthetic prototype (BFEP) allows fabrication of up to 14 teeth from composite in 1 hour, providing either a pre-treatment restoration or a long-term provisional solution until further treatment can be completed. As demonstrated herein, the BFEP enables superb function, stability, and esthetics in the interim while dispersing the cost of definitive treatment over time.
Graf, Alexandra C; Bauer, Peter; Glimm, Ekkehard; Koenig, Franz
2014-07-01
Sample size modifications in the interim analyses of an adaptive design can inflate the type 1 error rate, if test statistics and critical boundaries are used in the final analysis as if no modification had been made. While this is already true for designs with an overall change of the sample size in a balanced treatment-control comparison, the inflation can be much larger if in addition a modification of allocation ratios is allowed as well. In this paper, we investigate adaptive designs with several treatment arms compared to a single common control group. Regarding modifications, we consider treatment arm selection as well as modifications of overall sample size and allocation ratios. The inflation is quantified for two approaches: a naive procedure that ignores not only all modifications, but also the multiplicity issue arising from the many-to-one comparison, and a Dunnett procedure that ignores modifications, but adjusts for the initially started multiple treatments. The maximum inflation of the type 1 error rate for such types of design can be calculated by searching for the "worst case" scenarios, that are sample size adaptation rules in the interim analysis that lead to the largest conditional type 1 error rate in any point of the sample space. To show the most extreme inflation, we initially assume unconstrained second stage sample size modifications leading to a large inflation of the type 1 error rate. Furthermore, we investigate the inflation when putting constraints on the second stage sample sizes. It turns out that, for example fixing the sample size of the control group, leads to designs controlling the type 1 error rate. © 2014 The Author. Biometrical Journal published by WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pretzsch, Gunter; Salewski, Peter; Sogalla, Martin
2013-07-01
The German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) on behalf of the Government of the Federal Republic of Germany supports the State Nuclear Regulatory Inspectorate of Ukraine (SNRIU) in enhancement of nuclear safety and radiation protection and strengthening of the physical protection. One of the main objectives of the agreement concluded by these parties in 2008 was the retrieval and safe interim storage of disused orphan high radioactive sealed sources in Ukraine. At present, the Ukrainian National Registry does not account all high active radiation sources but only for about 70 - 80 %. GRSmore » in charge of BMU to execute the program since 2008 concluded subcontracts with the waste management and interim storage facilities RADON at different regions in Ukraine as well with the waste management and interim storage facility IZOTOP at Kiev. Below selected examples of removal of high active Co-60 and Cs-137 sources from irradiation facilities at research institutes are described. By end of 2012 removal and safe interim storage of 12.000 disused radioactive sealed sources with a total activity of more than 5,7.10{sup 14} Bq was achieved within the frame of this program. The German support program will be continued up to the end of 2013 with the aim to remove and safely store almost all disused radioactive sealed sources in Ukraine. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allentuck, J; Appleman, J; Carroll, T O
1977-11-01
In compliance with its mandate to accelerate the development and use of energy technologies in furtherance of the state's economic growth and the best interests of its population, the New York State Energy Research and Development Authority (NYSERDA) initiated, in March 1977, an assessment of energy research and development priorities. This report presents a view of the energy supply-demand future of the state, and the ways in which this future can be affected by external contingencies and concerted policies. That view takes into consideration energy supplies that may be available to the state as well as energy demands as theymore » are affected by demographic and economic changes within the state. Also included are the effects of national energy policies and technological developments as they modify both supplies and demands in New York State. Finally, this report proceeds to identify those general technological areas in which the Authority's program can be of greatest potential benefit to the state's social and economic well being. This effort aims at a cost/benefit analysis determination of RD and D priorities. The preliminary analysis thus far indicates these areas as being of highest priority: energy conservation in buildings (promotion and execution of RD and D) and industry; district heating; fuel cell demonstration;solar heating and cooling (analysis, demonstration, and information dissemination); energy-environment interaction (analysis); energy information services; and, in general, the attraction of Federal RD and D programs to the state.« less
ERIC Educational Resources Information Center
Oregon State Univ., Corvallis.
The report describes the organizational phase of a project designed to create program models and supporting literature for exploratory industrial career development programs for grades seven to ten. The project was undertaken by Oregon State University in cooperation with the Oregon State Department of Education and involved the formation of a…
Israel: Background and U.S. Relations
2011-02-14
the United States and Israel have developed a close friendship based on common democratic values, religious affinities, and security interests. U.S...following completion of the interim withdrawal. • Mutual unimpeded access to places of religious and historical significance will be provided on a non...Palestinian state Opposition 3 Habayet Hayehudi (Jewish Home)-New National Religious Party (NRP)c Nationalist; Ashkenazi Orthodox; opposes a
ERIC Educational Resources Information Center
Richburg-Hayes, Lashawn; Patel, Reshma; Brock, Thomas; de la Campa, Elijah; Rubb, Timothy; Valenzuela, Ireri
2015-01-01
One of the original purposes of student financial aid was to ensure fairer access to post-secondary education to those least able to afford it and to those traditionally underrepresented. Various federal and state programs were put in place to achieve this goal, including the federal Pell Grant and state aid programs. Yet policymakers and…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
... article is being imported into the United States in such increased quantities, in absolute terms or... provided for under Annex 2-B of the Agreement in the duty imposed on the article; or (b) increase duties on... from Korea is being imported into the United States in such increased quantities, in absolute terms or...
The Deep Underground Science and Engineering Laboratory at Homestake
NASA Astrophysics Data System (ADS)
Lesko, Kevin T.
2009-12-01
The US National Science Foundation and the US underground science community are well into the campaign to establish a world-class, multi-disciplinary deep underground science and engineering laboratory—DUSEL. The NSF's review committee, following the first two NSF solicitations, selected Homestake as the prime site to be developed into an international, multidisciplinary, world-class research facility. Homestake DUSEL will provide much needed underground research space to help relieve the worldwide shortage, particularly at great depth, and will develop research campuses at different depths to satisfy the research requirements for the coming decades. The State of South Dakota demonstrates remarkable support for the project and has secured the site with the transfer of the former Homestake Gold Mine and has initiated re-entry and rehabilitation of the facility to host a modest interim science program with state funds and those from a substantial philanthropic donor. I review the scientific case for DUSEL and the progress in developing the preliminary design of DUSEL in Homestake and the integrated suite of experiments to be funded along with the facility.
Type A polymer concrete overlay field trials : interim report.
DOT National Transportation Integrated Search
1982-12-01
On July 31 and August 1, 1982, the Oregon State Highway Division successfully placed a methyl methacrylate polymer concrete overlay on a portion of one span of a major interchange ramp in Portland, Oregon. Two proprietary polymer concretes were used ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
....regulations.gov Web site is an ``anonymous access'' system, which means the EPA will not know your identity or... and the states will be shifting their focus to development of interim progress reports required by the...
Snowplow operator driving time: survey of state and local practices : final report.
DOT National Transportation Integrated Search
2016-05-01
In February 2015, Utah Department of Transportation (UDOT) issued interim guidance for continuous working : hours for UDOTs snowplow operators. Letter of Instruction 15-1 specified the number of hours that could be : worked by snowplow operators a...
DOT National Transportation Integrated Search
2007-02-14
This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...
Schwartz, Robert P.; Kelly, Sharon M.; Mitchell, Shannon G.; Dunlap, Laura; Zarkin, Gary A.; Sharma, Anjalee; O’Grady, Kevin E.; Jaffe, Jerome H.
2016-01-01
Background Methadone maintenance is an effective treatment for opioid dependence but is rarely initiated in US jails. Patient navigation is a promising approach to improve continuity of care but has not been tested in bridging the gap between jail- and community-based drug treatment programs. Methods This is an open-label randomized clinical trial among 300 adult opioid dependent newly-arrested detainees that will compare three treatment conditions: methadone maintenance without routine counseling (termed Interim Methadone; IM) initiated in jail v. IM and patient navigation v. enhanced treatment-as-usual. The two primary outcomes will be: (1) the rate of entry into treatment for opioid use disorder within 30 days from release and (2) frequency of opioid positive urine tests over the 12-month follow-up period. An economic analysis will examine the costs, cost-effectiveness, and cost-benefit ratio of the study interventions. Results We describe the background and rationale for the study, its aims, hypotheses, and study design. Conclusions Given the large number of opioid dependent detainees in the US and elsewhere, initiating IM at the time of incarceration could be a significant public health and clinical approach to reducing relapse, recidivism, HIV-risk behavior, and criminal behavior. An economic analysis will be conducted to assist policy makers in determining the utility of adopting this approach. PMID:27282117
Schwartz, Robert P; Kelly, Sharon M; Mitchell, Shannon G; Dunlap, Laura; Zarkin, Gary A; Sharma, Anjalee; O'Grady, Kevin E; Jaffe, Jerome H
2016-07-01
Methadone maintenance is an effective treatment for opioid dependence but is rarely initiated in US jails. Patient navigation is a promising approach to improve continuity of care but has not been tested in bridging the gap between jail- and community-based drug treatment programs. This is an open-label randomized clinical trial among 300 adult opioid dependent newly-arrested detainees that will compare three treatment conditions: methadone maintenance without routine counseling (termed Interim Methadone; IM) initiated in jail v. IM and patient navigation v. enhanced treatment-as-usual. The two primary outcomes will be: (1) the rate of entry into treatment for opioid use disorder within 30days from release and (2) frequency of opioid positive urine tests over the 12-month follow-up period. An economic analysis will examine the costs, cost-effectiveness, and cost-benefit ratio of the study interventions. We describe the background and rationale for the study, its aims, hypotheses, and study design. Given the large number of opioid dependent detainees in the US and elsewhere, initiating IM at the time of incarceration could be a significant public health and clinical approach to reducing relapse, recidivism, HIV-risk behavior, and criminal behavior. An economic analysis will be conducted to assist policy makers in determining the utility of adopting this approach. ClinicalTrials.gov: NCT02334215. Copyright © 2016 Elsevier Inc. All rights reserved.
20 CFR 10.331 - How and when should the medical report be submitted?
Code of Federal Regulations, 2010 CFR
2010-04-01
... medical report be submitted? (a) Form CA-16 may be used for the initial medical report, while Form CA-20... employee or the physician. (See also § 10.210.) The employer may request a copy of the report from OWCP. The employer should use Form CA-17 to obtain interim reports concerning the duty status of an employee...
20 CFR 10.331 - How and when should the medical report be submitted?
Code of Federal Regulations, 2011 CFR
2011-04-01
... medical report be submitted? (a) Form CA-16 may be used for the initial medical report, while Form CA-20... employee or the physician. (See also § 10.210.) The employer may request a copy of the report from OWCP. The employer should use Form CA-17 to obtain interim reports concerning the duty status of an employee...
ERIC Educational Resources Information Center
Liberman, Akiva; Cahill, Meagan; Cramer, Lindsey
2012-01-01
The Case Management Partnership Initiative (CMPI) addresses chronic truancy by linking truant ninth graders and their families to social services and case management, along with regular interagency case management meetings. A pilot was conducted at Anacostia and Ballou High Schools in 2011-2012. The implementation evaluation found that the pilot…
Annotated Bibliography for Lake Erie. Volume IV. Physical,
1974-10-01
Presque Isle Bay, Erie , Pennsylvania - interim report. Environ- mental Sciences Inc. Pittsburg, Pa. 235 P. The factors... Presque Isle Peninsula, Erie , Pennsylvania , indicates apparent correlation of initial high erosion rates of placed beach fill with sand size character...changes since 1854. (CE) 777. U. S. Army Corps of Engineers. 1960. Presque Isle Peninsula, Erie , Pennsylvania , beach erosion con- trol study.
An RDF version of the VO Registry Version 1.00
NASA Astrophysics Data System (ADS)
Gray, Norman; Gray, Norman
2007-09-01
We describe the initial implementation of an RDF version of the IVOA Resource Registry, serving the registry data via a SPARQL query endpoint, including the creation of the ontology analogues of an important subset of the relevant XML Schemas, and the mechanics of the conversion process. The result is an experimental service, and this is an interim document.
ERIC Educational Resources Information Center
Calhoun, Dave
Systemic reform of mathematics and science education in K-12 schools, sponsored by the National Science Foundation (NSF), was instituted in 1991. Built into the initiatives were guidelines for local (internal) evaluation of programs. This paper is a summary of the evaluation conceptualizations and efforts of one evaluator at the Fresno Unified…
ERIC Educational Resources Information Center
Weigel, Corina; Kokocinski, Kathrin; Lederer, Peter; Dotsch, Jorg; Rascher, Wolfgang; Knerr, Ina
2008-01-01
Objective: The authors performed a group-based program for obese children and adolescents in Bavaria, Germany to enable them to establish a health-oriented lifestyle and to reduce overweight. The authors compared this program with a control approach based on the patients' own initiative. Design: This is a controlled clinical trial. Setting: A…
National space transportation studies
NASA Technical Reports Server (NTRS)
Durocher, Cort L.; Irby, Thomas M.; Jenkins, James C.; Gorski, Raymond J.
1986-01-01
This paper describes the government and industry activities and findings in response to a Presidential directive to study second-generation space transportation systems. Topics discussed include study purpose, mission needs, architecture development, system concepts, and technology recommendations. Interim study findings will also be presented. The study is being jointly managed by DOD and NASA and equally funded by DOD, NASA, and the Strategic Defense Initiative Organization.
Multi Canister Overpack (MCO) Topical Report [SEC 1 THRU 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
LORENZ, B.D.
In February 1995, the US Department of Energy (DOE) approved the Spent Nuclear Fuel (SNF) Project's ''Path Forward'' recommendation for resolution of the safety and environmental concerns associated with the deteriorating SNF stored in the Hanford Site's K Basins (Hansen 1995). The recommendation included an aggressive series of projects to design, construct, and operate systems and facilitates to permit the safe retrieval, packaging, transport, conditions, and interim storage of the K Basins' SNF. The facilities are the Cold VAcuum Drying Facility (CVDF) in the 100 K Area of the Hanford Site and the Canister Storage building (CSB) in the 200more » East Area. The K Basins' SNF is to be cleaned, repackaged in multi-canister overpacks (MCOs), removed from the K Basins, and transported to the CVDF for initial drying. The MCOs would then be moved to the CSB and weld sealed (Loscoe 1996) for interim storage (about 40 years). One of the major tasks associated with the initial Path Forward activities is the development and maintenance of the safety documentation. In addition to meeting the construction needs for new structures, the safety documentation for each must be generated.« less
Science Opportunities Enabled by NASA's Constellation System: Interim Report
NASA Astrophysics Data System (ADS)
Committee On Science Opportunities Enabled By Nasa'S Constellation System, National Research Council
To begin implementation of the Vision for Space Exploration (recently renamed "United States Space Exploration Policy"), NASA has begun development of new launch vehicles and a human-carrying spacecraft that are collectively called the Constellation System. In November 2007, NASA asked the NRC to evaluate the potential for the Constellation System to enable new space science opportunities. For this interim report, 11 existing "Vision Mission" studies of advanced space science mission concepts inspired by earlier NASA forward-looking studies were evaluated. The focus was to assess the concepts and group them into two categories: more-deserving or less deserving of future study. This report presents a description of the Constellation System and its opportunities for enabling new space science opportunities, and a systematic analysis of the 11 Vision Mission studies. For the final report, the NRC issued a request for information to the relevant communities to obtain ideas for other mission concepts that will be assessed by the study committee, and several issues addressed only briefly in the interim report will be explored more fully.
DOT National Transportation Integrated Search
1995-12-01
Demand for increased ferry service and expanding regional transportation plans mandate that the Washington State Department of Transportation (WSDOT) consider widening existing dock structures over the waters of Puget Sound. However, concerns about t...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) “Carburetor Cleanliness Test Procedure, State-of-the-Art Summary, Report: 1973-1981”, Coordinating Research... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold... who manufacture, supply, or transfer detergent additives or detergent-additized post-refinery...
Nutrient Control Design Manual–State of the Technology Review Report
This EPA document is an interim product in the development of revised design guidance for nitrogen and phosphorus control at municipal WWTPs. This document presents findings from an extensive review of nitrogen and phosphorus control technologies and techniques currently applied...
NASA Astrophysics Data System (ADS)
Kunstmann, H.; Lorenz, C.
2012-12-01
The three state-of-the-art global atmospheric reanalysis models—namely, ECMWF Interim Re-Analysis (ERA-Interim), Modern-Era Retrospective Analysis for Research and Applications (MERRA; NASA), and Climate Forecast System Reanalysis (CFSR; NCEP)—are analyzed and compared with independent observations (GPCC; GPCP; CRU; CPC; DEL; HOAPS) in the period between 1989 and 2006. Comparison of precipitation and temperature estimates from the three models with gridded observations reveals large differences between the reanalyses and also of the observation datasets. A major source of uncertainty in the observations is the spatial distribution and change of the number of gauges over time. In South America for example, active measuring stations were reduced from 4267 to 390. The quality of precipitation estimates from the reanalyses strongly depends on the geographic location, as there are significant differences especially in tropical regions. The closure of the water cycle in the three reanalyses is analyzed by estimating long-term mean values for precipitation, evapotranspiration, surface runoff, and moisture flux divergence. Major shortcomings in the moisture budgets of the datasets are mainly due to inconsistencies of the net precipitation minus evaporation and evapotranspiration, respectively, (P-E) estimates over the oceans and landmasses. This imbalance largely originates from the assimilation of radiance sounding data from the NOAA-15 satellite, which results in an unrealistic increase of oceanic P-E in the MERRA and CFSR budgets. Overall, ERA-Interim shows both a comparatively reasonable closure of the terrestrial and atmospheric water balance and a reasonable agreement with the observation datasets. The limited performance of the three state-of-the-art reanalyses in reproducing the hydrological cycle, however, puts the use of these models for climate trend analyses and long-term water budget studies into question.
Developing a concept for a national used fuel interim storage facility in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Donald Wayne
2013-07-01
In the United States (U.S.) the nuclear waste issue has plagued the nuclear industry for decades. Originally, spent fuel was to be reprocessed but with the threat of nuclear proliferation, spent fuel reprocessing has been eliminated, at least for now. In 1983, the Nuclear Waste Policy Act of 1982 [1] was established, authorizing development of one or more spent fuel and high-level nuclear waste geological repositories and a consolidated national storage facility, called a 'Monitored Retrievable Storage' facility, that could store the spent nuclear fuel until it could be placed into the geological repository. Plans were under way to buildmore » a geological repository, Yucca Mountain, but with the decision by President Obama to terminate the development of Yucca Mountain, a consolidated national storage facility that can store spent fuel for an interim period until a new repository is established has become very important. Since reactor sites have not been able to wait for the government to come up with a storage or disposal location, spent fuel remains in wet or dry storage at each nuclear plant. The purpose of this paper is to present a concept developed to address the DOE's goals stated above. This concept was developed over the past few months by collaboration between the DOE and industry experts that have experience in designing spent nuclear fuel facilities. The paper examines the current spent fuel storage conditions at shutdown reactor sites, operating reactor sites, and the type of storage systems (transportable versus non-transportable, welded or bolted). The concept lays out the basis for a pilot storage facility to house spent fuel from shutdown reactor sites and then how the pilot facility can be enlarged to a larger full scale consolidated interim storage facility. (authors)« less
5 CFR 772.102 - Interim personnel actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...
5 CFR 772.102 - Interim personnel actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...
NASA Technical Reports Server (NTRS)
2002-01-01
The NASA/Navy Benchmarking Exchange (NNBE) was undertaken to identify practices and procedures and to share lessons learned in the Navy's submarine and NASA's human space flight programs. The NNBE focus is on safety and mission assurance policies, processes, accountability, and control measures. This report is an interim summary of activity conducted through October 2002, and it coincides with completion of the first phase of a two-phase fact-finding effort.In August 2002, a team was formed, co-chaired by senior representatives from the NASA Office of Safety and Mission Assurance and the NAVSEA 92Q Submarine Safety and Quality Assurance Division. The team closely examined the two elements of submarine safety (SUBSAFE) certification: (1) new design/construction (initial certification) and (2) maintenance and modernization (sustaining certification), with a focus on: (1) Management and Organization, (2) Safety Requirements (technical and administrative), (3) Implementation Processes, (4) Compliance Verification Processes, and (5) Certification Processes.
ERIC Educational Resources Information Center
Anyaso, Hilary Hurd
2009-01-01
The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…
40 CFR 155.56 - Interim registration review decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...
Forced synchronization of large-scale circulation to increase predictability of surface states
NASA Astrophysics Data System (ADS)
Shen, Mao-Lin; Keenlyside, Noel; Selten, Frank; Wiegerinck, Wim; Duane, Gregory
2016-04-01
Numerical models are key tools in the projection of the future climate change. The lack of perfect initial condition and perfect knowledge of the laws of physics, as well as inherent chaotic behavior limit predictions. Conceptually, the atmospheric variables can be decomposed into a predictable component (signal) and an unpredictable component (noise). In ensemble prediction the anomaly of ensemble mean is regarded as the signal and the ensemble spread the noise. Naturally the prediction skill will be higher if the signal-to-noise ratio (SNR) is larger in the initial conditions. We run two ensemble experiments in order to explore a way to reduce the SNR of surface winds and temperature. One ensemble experiment is AGCM with prescribing sea surface temperature (SST); the other is AGCM with both prescribing SST and nudging the high-level temperature and winds to ERA-Interim. Each ensemble has 30 members. Larger SNR is expected and found over the tropical ocean in the first experiment because the tropical circulation is associated with the convection and the associated surface wind convergence as these are to a large extent driven by the SST. However, small SNR is found over high latitude ocean and land surface due to the chaotic and non-synchronized atmosphere states. In the second experiment the higher level temperature and winds are forced to be synchronized (nudged to reanalysis) and hence a larger SNR of surface winds and temperature is expected. Furthermore, different nudging coefficients are also tested in order to understand the limitation of both synchronization of large-scale circulation and the surface states. These experiments will be useful for the developing strategies to synchronize the 3-D states of atmospheric models that can be later used to build a super model.
Seat belt and shoulder strap use among urban travelers : interim report.
DOT National Transportation Integrated Search
1974-01-01
Because of the need to establish a data baseline for belt usage without mandatory legislation, a survey of selected areas of the state of Virginia was conducted during January 1974 to determine lap and shoulder belt use by urban travelers. Observer-d...
Development of maintenance practices for Oregon F-Mix : Interim report
DOT National Transportation Integrated Search
1999-08-01
The Oregon Department of Transportation (ODOT) produces an open-graded asphalt pavement(F-mix) unlike most open-graded pavements used in the United States. Its 25 mm maximum aggregate size and typical lift thickness of 50 mm is more like the porous a...
Phase I interim report : automotive collision avoidance system field operational test
DOT National Transportation Integrated Search
2002-05-30
In June of 1999, the National Highway Traffic Safety Administration entered into a cooperative research agreement with General Motors to advance the state-of-the-art of rear-end collision warning technology and conduct a field operational test of a f...
South Philadelphia Passive Sampler and Sensor Study: Interim Report
Starting in June 2013, the United States Environmental Protection Agency (U.S. EPA) and the City of Philadelphia Air Measurements Services began collaborative research on the use of passive samplers (PSs) and stand-alone air measurement (SAM) systems to improve information on the...
46 CFR 309.101 - Amendment of interim binders.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS VALUES FOR WAR RISK... in market values during such period, the Maritime Administration reserves the right to revise the... provided therefor, or in substitution for any value appearing in such space, the stated valuation of the...
Petrotac bridge deck waterproofing membrane on Five Mile Creek Bridge : first interim report.
DOT National Transportation Integrated Search
1986-09-01
During the 1970's, the Oregon State Highway Division was involved in a Federally funded experimental program to evaluate various waterproofing membrane systems for bridge decks. Through this program, a list of approved products and/or systems was dev...
Predicting moisture-induced damage to asphaltic concrete : field evaluation phase, interim report.
DOT National Transportation Integrated Search
1977-01-01
Virginia is one of seven state and federal agencies participating in a field evaluation of a stripping test method developed under NCHRP Project 4-8 (3), "Predicting Moisture- Induced Damage to Asphaltic Concrete." The test method is being used to ev...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
.... 120316196-2195-01] RIN 0648-BB89 Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the Northeastern United States; Northeast Multispecies Fishery; Interim Action; Withdrawn AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA...
DOT National Transportation Integrated Search
1999-04-30
This report documents a sample of heavy-duty truck activity. This research effort was originated by the Planning and Technical Support Division of the California Air Resources Board (CARB) and jointly supported by the Federal Highway Administration (...
Evaluation of the healthy schools program: Part I. Interim progress.
Beam, Margaret; Ehrlich, Ginny; Donze Black, Jessica; Block, Audrey; Leviton, Laura C
2012-01-01
Federal and state policies identify schools as a setting to prevent childhood obesity, but schools need better health-promoting strategies. The objective of this study was to evaluate interim progress in schools receiving hands-on training from the Healthy Schools Program, the nation's largest school-based program aimed at preventing childhood obesity. The 4-year program targets schools with predominantly low-income, African American, or Hispanic students. In 2010 we assessed schools that enrolled in the 2007-2008 and 2008-2009 school years. School representatives completed an inventory of 8 content areas: policy and systems, school meals, competitive foods and beverages, health education, physical education, physical activity outside of physical education, before- and after-school programs, and school employee wellness. Schools' baseline inventory was compared by t test with the most recent inventory available. Schools made significant changes in all content areas, and effect sizes were moderate to large. Participating schools improved environmental policies and practices to prevent childhood obesity. The program is a resource to implement recent federal and state policies.
17 CFR 210.8-03 - Interim financial statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...
24 CFR 35.1330 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...
7 CFR 1738.21 - Interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...
Gordon H. Reeves; Brian R. Pickard; K. Norman Johnson
2016-01-01
The Aquatic Conservation Strategy (ACS) of the Northwest Forest Plan guides management of riparian and aquatic ecosystems on federal lands in western Oregon, western Washington, and northern California. We applied new scientific findings and tools to evaluate two potential options, A and B, for refining interim riparian reserves to meet ACS goals and likely challenges...
ERIC Educational Resources Information Center
Ontario Ministry of Community and Social Services, Toronto.
This document reports on 13 pilot projects of the Flexible Services Development Project (FSDP), which was initiated in Ontario, Canada, in 1988 to improve child care services for rural families, families with unusual work schedules, families facing short-term emergencies, and families with children who have short-term illnesses. The data and…
ERIC Educational Resources Information Center
Tracor, Inc., Austin, TX.
Produced in four parts, this report covers a study of poor people in Austin, Texas, begun in 1967. Initial research efforts defined the problem and identified the population to be studied. An interim report was then made on the first year's findings. This involved evaluating some of the community action programs (CAP) and identifying and analyzing…
ERIC Educational Resources Information Center
O'Donnell, Lisa; Bielby, Gill; Golden, Sarah; Morris, Marian; Walker, Matthew; Maguire, Sue
2007-01-01
The Department for Education and Skills (Replace by the Department for Children, Schools and Families as of June 28, 2007) commissioned the National Foundation for Educational Research (NFER) to conduct an evaluation of the Youth Opportunity Fund and Youth Capital Fund (YOF/YCF). This summary presents the main findings from the interim report of…
An Approach for Evaluating the Technical Quality of Interim Assessments
ERIC Educational Resources Information Center
Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian
2010-01-01
Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…
7 CFR 15a.71 - Interim procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...
7 CFR 1735.75 - Interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2014 CFR
2014-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2013 CFR
2013-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2012 CFR
2012-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2011 CFR
2011-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
5 CFR 1315.9 - Required documentation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... following delivery to inspect and/or test goods furnished or to evaluate services performed is stated; (6... later than the first request for payment; (9) If using Fast Payment, the proper FAR clause stipulating Fast Payment is required. (b)(1) Except for interim payment requests under cost-reimbursement service...
DOT National Transportation Integrated Search
1981-12-01
Construction and short-term pavement performance problems were noted in the Pacific Northwest and throughout the United States during the past five years. Several reasons have been suggested to explain this sudden change in pavement performance, such...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
... Determination To Defer Sanctions; California; South Coast Air Quality Management District AGENCY: Environmental... Quality Management District's (SCAQMD) portion of the California State Implementation Plan (SIP) published... California submitted the ``South Coast Air Quality Management District Proposed Contingency Measures for the...
40 CFR 142.22 - Review of State variances, exemptions and schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... scientific matters bearing on such variances and exemptions), and (2) advise of the opportunity to submit...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-20
... States-Panama Trade Promotion Agreement Implementation Act (the ``Act'') [Pub. L. 112-43] implements the... Promotion Agreement (the ``Agreement''). This safeguard mechanism applies when, as a result of the...) all data available to the requestor showing changes in productivity, utilization of capacity...
UNITED STATES AND GERMAN BILATERAL AGREEMENT ON REMEDIATION OF HAZARDOUS WASTE SITES
The U.S. Environmental Protection Agency (EPA) and Germany's Bundesministerium fur Forschung und Technologie (BMFT) are involved in a collaborative effort called the U.S. and German Bilateral Agreement on Remediation of Hazardous Waste Sites. he purpose of this interim status rep...
46 CFR 308.2 - Requirements for eligible vessels.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE... foreign commerce of the United States or which would be required in the event of war or national emergency... vessels for which war risk insurance interim binders have been issued shall file a Vessel Position Report...
South East Asia to America: Links in a Chain (Part Two).
ERIC Educational Resources Information Center
Rose, Peter I.
1981-01-01
Discusses the transfer of Indochinese refugees from Southeast Asia to the United States, their stay in interim refugee camps, the voyage by plane, bureaucratic problems, and their first encounter with American life. Provides an anecdotal account of one family's experiences and reactions. (GC)
DOT National Transportation Integrated Search
1991-02-01
The need to reduce Minnesota's dependence on land fills resulted in a unique cooperative venture by three state agencies. A partnership was forged between the Minnesota Pollution Control Agency (MPCA), the Minnesota Department of Natural Resources (D...
12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...
Results Of Initial Analyses Of The Salt (Macro) Batch 9 Tank 21H Qualification Samples
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T.
2015-10-08
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Interim Salt Disposition Project (ISDP) Salt (Macro) Batch 9 for processing through the Actinide Removal Process (ARP) and the Modular Caustic-Side Solvent Extraction Unit (MCU). This document reports the initial results of the analyses of samples of Tank 21H. Analysis of the Tank 21H Salt (Macro) Batch 9 composite sample indicates that the material does not display any unusual characteristics. Further results on the chemistry and other tests will be issued in the future.
Israel: Background and U.S. Relations in Brief
2017-01-06
future Israeli-Palestinian negotiations by Secretary of State John Kerry on December 28, 2016, and other statements and actions related to issues of...Interim Agreement; permanent status to be determined through further negotiation . The status of the Gaza Strip is a final status issue to be resolved...through negotiations . Israel proclaimed Jerusalem as its capital in 1950, but the United States, like nearly all other countries, retains its embassy in
ERIC Educational Resources Information Center
New York State Interdepartmental Fuel and Energy Committee, Albany.
After presenting the background of the availability of fuel for transportation and the increasing per capita energy consumption, the report examines the State's role in energy conservation. Five proposals are outlined: (1) a coordinated education program designed to increase public awareness of the current energy situation; (2) a pilot program of…
An appraisal of the ground-water resources of the lower Susquehanna River basin (An interim report)
Seaber, Paul R.; Hollyday, Este F.
1965-01-01
This report describes the availability, quantity, quality, variability, and cost of development of the ground-water resources in the lower Susquehanna River basin. The report has been prepared for and under specifications established by the Corps of Engineers, U. S. Army, and the Public Health Service, Department of Health, Education, and Welfare.A comprehensive study of the water and related land resources of the Susquehanna River basin was authorized by the Congress of the United States in October 1961, and the task of preparing a report and of coordinating the work being done by others in support of the study was assigned to the Corps of Engineers. The comprehensive study is being conducted by several Federal departments and independent agencies in cooperation with the States of New York, Pennsylvania, and Maryland. The Public Health Service under its authority in the Federal Water Pollution Control Act (P. L. 660) initiated a comprehensive water quality control program for the Chesapeake drainage basin, which includes the Susquehanna River basin.This report is intended to serve the specific needs for ground-water information of both the Corps of Engineers and the Public Health Service, as well as those of the other participating Federal and State agencies.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...
Linking the ACT ASPIRE Assessments to NWEA MAP Assessments
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from Measures of Academic Progress® (MAP®) interim assessment scores. One important tool is the concordance table between MAP and state summative assessments. Concordance tables have been used for decades to relate scores on…
40 CFR 57.816 - Effect of negative recommendation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Effect of negative recommendation. 57... Reduction Technology § 57.816 Effect of negative recommendation. No waiver of the interim requirement for... or a State first takes into account the Administrator's report, findings, and recommendations as to...
Cognitive Awareness Research in the Classroom
ERIC Educational Resources Information Center
Hogg, James H.
1975-01-01
A descriptive study to determine the continued effectiveness of a program of cognitive verbal awareness training was carried out over a three year period. It was found that ability to use cognitive verbalizations above the level of stating, or eliciting information remained whether or not interim feedback was given. (Author)
Guidance: Policy for Municipality and MSW CERCLA Settlements at NPL Co-Disposal Sites
Transmittal memorandum and policy supplementing the 9/30/89 Interim Policy on CERCLA Settlements Involving Municipalities and Municipal Wastes. 1998 MSW Policy states that EPA will continue its policy of generally not identifying generators and transporters of MSW as PRPs at NPL sites.
The Interim Years of Cyberspace
2013-02-01
Atlantic Treaty Organization even went so far as to state that the Stuxnet worm could have caused “a new Chernobyl ” if the program had released the...Messmer, “Stuxnet Could Have Caused ‘New Chernobyl ,’ Russian Ambassador Says,” Network World, 27 January 2011, http://www.networkworld.com/news/2011/012711
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Issue. 308.1 Section 308.1 Money and... Issue. Federal Reserve Banks, as Fiscal Agents of the United States, and the Treasury Department may issue full-paid interim certificates in lieu of definitive securities, against full-paid allotments of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-26
... Promotion Agreement (``U.S.-Colombia TPA''). Title III, Subtitle B, Section 321 through Section 328 of the United States-Colombia Trade Promotion Agreement Implementation Act (``Implementation Act'') [Pub. L. 112... requester showing changes in productivity, utilization of capacity, inventories, exports, wages, employment...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-28
... Trade Promotion Agreement (``US-Panama TPA''). Title III, Subtitle B, Section 321 through Section 328 of the United States-Panama Trade Promotion Agreement Implementation Act (``Implementation Act'') [Pub. L... changes in productivity, utilization of capacity, inventories, exports, wages, employment, domestic prices...
School, Work and Family Planning. Interim Impacts in Project Redirection.
ERIC Educational Resources Information Center
Polit, Denise F.; And Others
Project Redirection was designed to help pregnant and parenting adolescents progress toward eventual self-sufficiency by linking them with community agencies and volunteers at four geographically and ethnically diverse sites in the United States. Distinctive features of the program include: (1) a broad scope of services including employability…
Radon Measurements in Schools: An Interim Report.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Radiation Programs.
Radon-222 is a colorless, odorless, tasteless, radioactive gas that occurs naturally in soil, rocks, underground water, and air. The United States Environmental Protection Agency (EPA) and other scientific organizations have identified an increased risk of lung cancer associated with exposure to elevated levels of radon in homes. Schools in many…
The United States Environmental Protection Agency Geospatial Quality Council developed this document to harmonize the process of collecting, editing, and exporting spatial data of known quality using the Global Positioning System (GPS). Each organizational entity may adopt this d...
THE EDUCATION AND EMPLOYMENT OF TECHNICIANS. INTERIM REPORT.
ERIC Educational Resources Information Center
BJORKQUIST, DAVID C., ED.
THE TECHNICAL MANPOWER CONFERENCE, HELD AT THE PENNSYLVANIA STATE UNIVERSITY CAMPUS ON JANUARY 24 AND 25, 1968, WAS THE FIRST PHASE IN THE DISSEMINATION OF THE RESEARCH PROJECT, "EFFECTS OF FIELD AND JOB ORIENTED TECHNICAL RETRAINING ON MANPOWER UTILIZATION OF THE UNEMPLOYED." THE PRESENTATIONS IN PART I, INTENDED TO PROVIDE BACKGROUND…
Information Sharing Environment Interim Implementation Plan
2006-01-01
10 3.2.3 Integrating Results into the Broader ISE Implementation ........................ 11 3.3 ISE Governance ...and State, Local, and Tribal Governments , Law Enforcement Agencies, and the Private Sector...parallel with these efforts, Congress enacted three laws providing the U.S. Government with greater authority for collecting, analyzing, and disseminating
DOT National Transportation Integrated Search
2007-12-01
This report summarizes the findings of the first phase of LTRC research project 04-2P, which is sponsored by LADOTD. The project is assessing the current status and the state-of-the-practice of the LADOTD pavement management system (PMS). Results of ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-20
... to provide official inspection service through June 30, 2016, under the United States Grain Standards Act (USGSA), as amended. Fremont informed the Grain Inspection, Packers and Stockyards Administration... Service Company as the interim provider effective August 1, 2013 until a permanent designee is selected...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-25
... York, hereinafter referred to as the ``order.'' The order is effective under the Agricultural Marketing... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 929 [Doc. No. AMS-FV-12-0002... Reporting Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as...
43 CFR 2650.1 - Provisions for interim administration.
Code of Federal Regulations, 2011 CFR
2011-10-01
... forest fire protection services from the United States at no cost. The Secretary will promulgate criteria... substantial revenues are accruing as to lands for which forest fire protection services are furnished by the... Interior, or by the Secretary of Agriculture in the case of national forest lands, as provided by section...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
... Determination To Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... Valley Unified Air Pollution Control District (SJVUAPCD or District) portion of the California State...), we finalized a limited approval and limited disapproval of San Joaquin Valley Unified Air Pollution...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 929 [Doc. No. AMS-FV-12-0002... Reporting Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule revises the reporting requirements currently prescribed under the marketing...
DOT National Transportation Integrated Search
2000-04-01
In the mid 1990s the Federal Highway Administration (FHWA) established a High Performance Concrete (HPC) program aimed at demonstrating the positive effects of utilizing HPC in bridges. Research on the benefits of using HPC for bridges has shown a nu...
DOT National Transportation Integrated Search
2000-04-01
In the mid 1990s the Federal Highway Administration (FHWA) established a High Performance Concrete (HPC) program aimed at demonstrating the positive effects of utilizing HPC in bridges. Research on the benefits of using HPC for bridges has shown a nu...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
... Supplement (DFARS) to implement the United States--Panama Trade Promotion Agreement. This Trade Promotion...--Panama Trade Promotion Agreement. No respondents submitted public comments in response to the interim... effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Office of the Secretary Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan AGENCY: Department of Health and Human... Interim Implementation Guide for the National Health Security Strategy of the United States of America...
36 CFR 1206.84 - What is the format and content of the narrative report?
Code of Federal Regulations, 2010 CFR
2010-07-01
... ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES NATIONAL HISTORICAL PUBLICATIONS AND RECORDS COMMISSION Grant Administration § 1206.84 What is the format and content of the narrative report? (a) Interim narrative reports should state briefly the performance objectives and activities for the entire grant and...
Code of Federal Regulations, 2012 CFR
2012-07-01
... pore size less than or equal to 0.45 µm. 6. Place these filters in series with a 5.0 µm backup filter... for not more than 30 seconds and replacing it at the time of sampling before sampling is initiated at.... Ensure that the sampler is turned upright before interrupting the pump flow. 21. Check that all samples...
Code of Federal Regulations, 2013 CFR
2013-07-01
... pore size less than or equal to 0.45 µm. 6. Place these filters in series with a 5.0 µm backup filter... for not more than 30 seconds and replacing it at the time of sampling before sampling is initiated at.... Ensure that the sampler is turned upright before interrupting the pump flow. 21. Check that all samples...
Code of Federal Regulations, 2014 CFR
2014-07-01
... pore size less than or equal to 0.45 µm. 6. Place these filters in series with a 5.0 µm backup filter... for not more than 30 seconds and replacing it at the time of sampling before sampling is initiated at.... Ensure that the sampler is turned upright before interrupting the pump flow. 21. Check that all samples...
Symptomatic treatment in multiple sclerosis-interim analysis of a nationwide registry.
Skierlo, S; Rommer, P S; Zettl, U K
2017-04-01
To analyze symptomatic treatment in patients with multiple sclerosis (MS). Multiple sclerosis is a chronic inflammatory disease of the central nervous system, with accumulating disability symptoms like spasticity, voiding disorders, depression, and pain might occur. The nationwide German MS registry was initiated 2001 under guidance of the German MS society (Deutsche MS Gesellschaft). This study was performed as an interim analysis to lay foundation for future work on this topic. A subcohort of 5113 patients was assessed for this interim analysis. The mean age of the patients was 45.3 years; mean EDSS was 4.2. More than two-third of the enrolled patients were females (70.9%). Most frequent symptoms were fatigue (60%), followed by spasticity (52.5%) and voiding disorders (51.7%). The likelihood of treatment was highest for epileptic disorders (68.8%), spasticity (68.5%), pain (60.7%), and depression (58.9%). Multivariate regression analysis showed that retirement was the strongest factor predictive for antispastic treatment (β=.061, P=.005). Almost all patients in this analysis suffer from symptoms due to advanced MS. Treatment for the various symptoms differed tremendously. The likelihood of treatment correlated with the availability of effective therapeutic agents. Clinicians should put more awareness on MS symptoms. Symptomatic treatment may improve quality of life. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eide, J.; Baillieul, T. A.; Biedscheid, J.
2003-02-26
Battelle Columbus Laboratories (BCL), located in Columbus, Ohio, must complete decontamination and decommissioning (D&D) activities for nuclear research buildings and grounds by 2006, as directed by Congress. Most of the resulting waste (approximately 27 cubic meters [m3]) is remote-handled (RH) transuranic (TRU) waste destined for disposal at the Waste Isolation Pilot Plant (WIPP). The BCL, under a contract to the U.S. Department of Energy (DOE) Ohio Field Office, has initiated a plan to ship the TRU waste to the DOE Hanford Nuclear Facility (Hanford) for interim storage pending the authorization of WIPP for the permanent disposal of RH-TRU waste. Themore » first of the BCL RH-TRU waste shipments was successfully completed on December 18, 2002. This BCL shipment of one fully loaded 10-160B Cask was the first shipment of RH-TRU waste in several years. Its successful completion required a complex effort entailing coordination between different contractors and federal agencies to establish necessary supporting agreements. This paper discusses the agreements and funding mechanisms used in support of the BCL shipments of TRU waste to Hanford for interim storage. In addition, this paper presents a summary of the efforts completed to demonstrate the effectiveness of the 10-160B Cask system. Lessons learned during this process are discussed and may be applicable to other TRU waste site shipment plans.« less
Berhanu, Rebecca; Schnippel, Kathryn; Mohr, Erika; Hirasen, Kamban; Evans, Denise; Rosen, Sydney; Sanne, Ian
2016-01-01
We describe baseline characteristics, time to treatment initiation and interim patient outcomes at a decentralized, outpatient treatment site for rifampicin-resistant TB (RR-TB). Prospective observational cohort study of RR-TB patients from March 2013 until December 2014. Study subjects were followed until completion of the intensive phase of treatment (6 months), transfer out, or a final outcome (loss from treatment (LFT) or death). 214 patients with RR-TB were enrolled in the study. Xpert MTB/RIF was the diagnostic test of rifampicin resistance for 87% (n = 186), followed by direct PCR on AFB positive specimen in 14 (7%) and indirect PCR on cultured isolate in 5 (2%). Median time between sputum testing and treatment initiation was 10 days (IQR 6-21). Interim outcomes were available in 148 patients of whom 78% (n = 115) were still on treatment, 9% (n = 13) had died, and 14% (n = 20) were LFT. Amongst 131 patients with culture positive pulmonary TB, 85 (64.9%) were culture negative at 6 months, 12 were still sputum culture positive (9.2%) and 34 had no culture documented or contaminated culture (26%). Patients who initiated as outpatients within 1 week of sputum collection for diagnosis of RR-TB had a significantly lower incidence of LFT (IRR 0.30, 95% CI: 0.09-0.98). HIV co-infection occurred in 178 patients (83%) with a median CD4 count 88 cells/ml3 (IQR 27-218). Access to decentralized treatment coupled with the rapid diagnosis of RR-TB has resulted in short time to treatment initiation. Despite the lack of treatment delays, early treatment outcomes remain poor with high rates of death and loss from care.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Favalli, Andrea; Vo, D.; Grogan, Brandon R.
The purpose of the Next Generation Safeguards Initiative (NGSI)–Spent Fuel (SF) project is to strengthen the technical toolkit of safeguards inspectors and/or other interested parties. The NGSI–SF team is working to achieve the following technical goals more easily and efficiently than in the past using nondestructive assay measurements of spent fuel assemblies: (1) verify the initial enrichment, burnup, and cooling time of facility declaration; (2) detect the diversion or replacement of pins; (3) estimate the plutonium mass [which is also a function of the variables in (1)]; (4) estimate the decay heat; and (5) determine the reactivity of spent fuelmore » assemblies. Since August 2013, a set of measurement campaigns has been conducted at the Central Interim Storage Facility for Spent Nuclear Fuel (Clab), in collaboration with Swedish Nuclear Fuel and Waste Management Company (SKB). One purpose of the measurement campaigns was to acquire passive gamma spectra with high-purity germanium and lanthanum bromide scintillation detectors from Pressurized Water Reactor and Boiling Water Reactor spent fuel assemblies. The absolute 137Cs count rate and the 154Eu/ 137Cs, 134Cs/ 137Cs, 106Ru/ 137Cs, and 144Ce/ 137Cs isotopic ratios were extracted; these values were used to construct corresponding model functions (which describe each measured quantity’s behavior over various combinations of burnup, cooling time, and initial enrichment) and then were used to determine those same quantities in each measured spent fuel assembly. Furthermore, the results obtained in comparison with the operator declared values, as well as the methodology developed, are discussed in detail in the paper.« less
Schnippel, Kathryn; Mohr, Erika; Hirasen, Kamban; Evans, Denise; Rosen, Sydney; Sanne, Ian
2016-01-01
Objective We describe baseline characteristics, time to treatment initiation and interim patient outcomes at a decentralized, outpatient treatment site for rifampicin-resistant TB (RR-TB). Methods Prospective observational cohort study of RR-TB patients from March 2013 until December 2014. Study subjects were followed until completion of the intensive phase of treatment (6 months), transfer out, or a final outcome (loss from treatment (LFT) or death). Results 214 patients with RR-TB were enrolled in the study. Xpert MTB/RIF was the diagnostic test of rifampicin resistance for 87% (n = 186), followed by direct PCR on AFB positive specimen in 14 (7%) and indirect PCR on cultured isolate in 5 (2%). Median time between sputum testing and treatment initiation was 10 days (IQR 6–21). Interim outcomes were available in 148 patients of whom 78% (n = 115) were still on treatment, 9% (n = 13) had died, and 14% (n = 20) were LFT. Amongst 131 patients with culture positive pulmonary TB, 85 (64.9%) were culture negative at 6 months, 12 were still sputum culture positive (9.2%) and 34 had no culture documented or contaminated culture (26%). Patients who initiated as outpatients within 1 week of sputum collection for diagnosis of RR-TB had a significantly lower incidence of LFT (IRR 0.30, 95% CI: 0.09–0.98). HIV co-infection occurred in 178 patients (83%) with a median CD4 count 88 cells/ml3 (IQR 27–218). Conclusions Access to decentralized treatment coupled with the rapid diagnosis of RR-TB has resulted in short time to treatment initiation. Despite the lack of treatment delays, early treatment outcomes remain poor with high rates of death and loss from care. PMID:27812140
Favalli, Andrea; Vo, D.; Grogan, Brandon R.; ...
2016-02-26
The purpose of the Next Generation Safeguards Initiative (NGSI)–Spent Fuel (SF) project is to strengthen the technical toolkit of safeguards inspectors and/or other interested parties. The NGSI–SF team is working to achieve the following technical goals more easily and efficiently than in the past using nondestructive assay measurements of spent fuel assemblies: (1) verify the initial enrichment, burnup, and cooling time of facility declaration; (2) detect the diversion or replacement of pins; (3) estimate the plutonium mass [which is also a function of the variables in (1)]; (4) estimate the decay heat; and (5) determine the reactivity of spent fuelmore » assemblies. Since August 2013, a set of measurement campaigns has been conducted at the Central Interim Storage Facility for Spent Nuclear Fuel (Clab), in collaboration with Swedish Nuclear Fuel and Waste Management Company (SKB). One purpose of the measurement campaigns was to acquire passive gamma spectra with high-purity germanium and lanthanum bromide scintillation detectors from Pressurized Water Reactor and Boiling Water Reactor spent fuel assemblies. The absolute 137Cs count rate and the 154Eu/ 137Cs, 134Cs/ 137Cs, 106Ru/ 137Cs, and 144Ce/ 137Cs isotopic ratios were extracted; these values were used to construct corresponding model functions (which describe each measured quantity’s behavior over various combinations of burnup, cooling time, and initial enrichment) and then were used to determine those same quantities in each measured spent fuel assembly. Furthermore, the results obtained in comparison with the operator declared values, as well as the methodology developed, are discussed in detail in the paper.« less
The War in Iraq: An Interim Assessment
2005-11-01
potential lack of [IS resolve. A number of’Sunni Arab states, particularly Saudi Arabia and Syria, have provided support, d i ~ ectly or indirectl;i...to the Sunni insurgent inoveinent and the jihadists. They are concemetl that fellow Sunni Arab : in lraq may reap the whillwind they havc sewn ovel...challenge their own despotic regimes. Thus the frontline Sunni Arab states are hedging against the possibil~ty that the Iran- Iraq war may be
Xueri Dang; Chun-Ta Lai; David Y. Hollinger; Andrew J. Schauer; Jingfeng Xiao; J. William Munger; Clenton Owensby; James R. Ehleringer
2011-01-01
We evaluated an idealized boundary layer (BL) model with simple parameterizations using vertical transport information from community model outputs (NCAR/NCEP Reanalysis and ECMWF Interim Analysis) to estimate regional-scale net CO2 fluxes from 2002 to 2007 at three forest and one grassland flux sites in the United States. The BL modeling...
42 CFR 418.307 - Periodic interim payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...
Sachpekidis, Christos; Anwar, Hoda; Winkler, Julia; Kopp-Schneider, Annette; Larribere, Lionel; Haberkorn, Uwe; Hassel, Jessica C; Dimitrakopoulou-Strauss, Antonia
2018-07-01
The aim of the present study was to assess the value of interim 18 F-FDG PET/CT performed after the first two cycles of ipilimumab treatment in the prediction of the final clinical response to this type of immunotherapy. The study group comprised 41 patients with unresectable metastatic melanoma scheduled for ipilimumab therapy. Whole-body 18 F-FDG PET/CT was performed before the start of ipilimumab treatment (baseline PET/CT) and after the initial two cycles of ipilimumab treatment (interim PET/CT). Evaluation of patient response to treatment was based on the European Organization for Research and Treatment of Cancer (EORTC) 1999 criteria for PET as well as the recently proposed PET Response Evaluation Criteria for Immunotherapy (PERCIMT). The patients' best clinical response, assessed at a median of 21.4 months (range 6.3-41.9 months) was used as reference. According to their best clinical response, the patients were divided into two groups: those showing clinical benefit (CB) including stable disease, partial response and complete response (31 patients), and those showing no clinical benefit (no-CB including progressive disease (10 patients). According to the EORTC criteria, interim PET/CT demonstrated progressive metabolic disease (PMD) in 20 patients, stable metabolic disease (SMD) in 11 patients, partial metabolic response (PMR) in 8 patients, and complete metabolic response (CMR) in 2 patients. According to the PERCIMT, interim PET/CT demonstrated PMD in 9 patients, SMD in 24 patients, PMR in 6 patients and CMR in 2 patients. On the basis of the interim PET, the patients were divided in a similar manner to the division according to clinical response into those showing metabolic benefit (MB) including SMD, PMR and CMR, and those showing no metabolic benefit (no-MB) including PMD. According to this dichotomization, the EORTC criteria showed a sensitivity (correctly predicting CB) of 64.5%, a specificity (correctly predicting no-CB) of 90.0%, a positive predictive value (PPV) of 95.2%, a negative predictive value (NPV) of 45.0% and an accuracy of 70.7% in predicting best clinical response. The PERCIMT showed a sensitivity of 93.6%, a specificity of 70.0%, a PPV of 90.6%, a NPV of 77.8% and an accuracy of 87.8%. The McNemar test showed that the PERCIMT had a significantly higher sensitivity than EORTC criteria (p = 0.004), while there was no significant difference in specificity (p = 0.5). The agreement between the two sets of criteria was poor (McNemar test p = 0.001, and accordingly kappa = 0.46). The application of the recently proposed PERCIMT to interim 18 F-FDG PET/CT provides a more sensitive predictor of final clinical response to immunotherapy than the application of the EORTC criteria in patients with metastatic melanoma.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hawkins, H.G.; Christiansen, D.L.
1989-09-01
A major commitment has been made in the Houston area to develop physically separated transitways in the medians of freeways. The lanes are reserved for high-occupancy vehicles. Phase 1 of the first completed transitway opened on the Katy Freeway (I-10) in October 1984. The research study, funded jointly by the Metropolitan Transit Authority of Harris County and the Texas State Department of Highways and Public Transportation, was initiated in order to conduct a comprehensive analysis of the effects of permitting carpools to utilize the transitway. The report documents data collected in October 1988, 3.5 years after carpool utilization of themore » transitway began. The report compares the 1988 data to similar data collected before carpool utilization was permitted (March 1985) and after carpool utilization was permitted (April 1986, October 1987). These comparisons address numerous concerns and provide an indication of the effectiveness of allowing carpools on the transitway.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Christiansen, D.L.; McCasland, W.R.
1988-09-01
A major commitment has been made in the Houston area to develop physically separated transitways in the medians of freeways. The lanes are reserved for high-occupancy vehicles. Phase I of the first completed transitway opened on the Katy Freeway (I-10) in October 1984. Phase 2 opened in June 1987. To increase potential utilization of the facility, carpools began using the transitway on a test basis in April 1985. The research study, funded jointly by the Metropolitan Transit Authority of Harris County and the Texas State Department of Highways and Public Transportation, was initiated to undertake a comprehensive analysis of themore » effects of permitting carpool utilization. The report documents the data collected in October 1987, 2.5 years after carpool utilization of the transitway was permitted. In the report, these data are compared to similar data collected both before carpool utilization was permitted and on several occasions after carpool utilization was permitted.« less
Hennessey, Karen; Mendoza-Aldana, Jorge; Bayutas, Benjamin; Lorenzo-Mariano, Kayla Mae; Diorditsa, Sergey
2013-12-27
WHO's Western Pacific Region has the highest rates of hepatitis B virus (HBV) infection in the world; most countries have >8% prevalence of HBV chronic infection in their adult population. In 2005, Member States of the Region adopted a resolution to reduce chronic hepatitis B infection prevalence to less than 2% among children by 2012 as an interim milestone toward a regional goal of less than 1% prevalence. Country commitments to hepatitis B control and successes represent a remarkable public health achievement by preventing over 1 million chronic infections and 300,000 HBV-related deaths per birth cohort. Reported here is a review of the process and strategies for translating this public health initiative into practice including such activities as setting up an Expert Resource Panel, developing implementation guidelines, focusing on facility births while supporting efforts to reach home births, providing guidance for conducting seroprevalence surveys, and establishing a verification process. Copyright © 2012. Published by Elsevier Ltd.
Real-time forecasting of the April 11, 2012 Sumatra tsunami
Wang, Dailin; Becker, Nathan C.; Walsh, David; Fryer, Gerard J.; Weinstein, Stuart A.; McCreery, Charles S.; ,
2012-01-01
The April 11, 2012, magnitude 8.6 earthquake off the northern coast of Sumatra generated a tsunami that was recorded at sea-level stations as far as 4800 km from the epicenter and at four ocean bottom pressure sensors (DARTs) in the Indian Ocean. The governments of India, Indonesia, Sri Lanka, Thailand, and Maldives issued tsunami warnings for their coastlines. The United States' Pacific Tsunami Warning Center (PTWC) issued an Indian Ocean-wide Tsunami Watch Bulletin in its role as an Interim Service Provider for the region. Using an experimental real-time tsunami forecast model (RIFT), PTWC produced a series of tsunami forecasts during the event that were based on rapidly derived earthquake parameters, including initial location and Mwp magnitude estimates and the W-phase centroid moment tensor solutions (W-phase CMTs) obtained at PTWC and at the U. S. Geological Survey (USGS). We discuss the real-time forecast methodology and how successive, real-time tsunami forecasts using the latest W-phase CMT solutions improved the accuracy of the forecast.
Dehmer, Gregory J; Jennings, Jonathan; Madden, Ruth A; Malenka, David J; Masoudi, Frederick A; McKay, Charles R; Ness, Debra L; Rao, Sunil V; Resnic, Frederic S; Ring, Michael E; Rumsfeld, John S; Shelton, Marc E; Simanowith, Michael C; Slattery, Lara E; Weintraub, William S; Lovett, Ann; Normand, Sharon-Lise
2016-01-19
Public reporting of health care data continues to proliferate as consumers and other stakeholders seek information on the quality and outcomes of care. Medicare's Hospital Compare website, the U.S. News & World Report hospital rankings, and several state-level programs are well known. Many rely heavily on administrative data as a surrogate to reflect clinical reality. Clinical data are traditionally more difficult and costly to collect, but more accurately reflect patients' clinical status, thus enhancing the validity of quality metrics. We describe the public reporting effort being launched by the American College of Cardiology and partnering professional organizations using clinical data from the National Cardiovascular Data Registry (NCDR) programs. This hospital-level voluntary effort will initially report process of care measures from the percutaneous coronary intervention (CathPCI) and implantable cardioverter-defibrillator (ICD) registries of the NCDR. Over time, additional process, outcomes, and composite performance metrics will be reported. Copyright © 2016 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.
Linking the Kentucky K-PREP Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. One important tool is the concordance table between MAP and state summative assessments. Concordance tables have been used for decades to relate scores on…
Linking the Kansas KAP Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. One important tool is the concordance table between MAP and state summative assessments. Concordance tables have been used for decades to relate scores on…
Linking the PARCC Assessments to NWEA MAP Tests for Illinois
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. One important tool is the concordance table between MAP and state summative assessments. Concordance tables have been used for decades to relate scores on…
Linking the Texas STAAR Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. One important tool is the concordance table between MAP and state summative assessments. Concordance tables have been used for decades to relate scores on…
Linking the Nebraska NeSA Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. One important tool is the concordance table between MAP and state summative assessments. Concordance tables have been used for decades to relate scores on…
Linking the Alaska AMP Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. One important tool is the concordance table between MAP and state summative assessments. Concordance tables have been used for decades to relate scores on…
Linking the PARCC Assessments to NWEA MAP Tests for New Mexico
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. One important tool is the concordance table between MAP and state summative assessments. Concordance tables have been used for decades to relate scores on…
Linking the Arizona AZMERIT Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. One important tool is the concordance table between MAP and state summative assessments. Concordance tables have been used for decades to relate scores on…
Abstract for presentation. Advances in genomics will have significant implications for risk assessment policies and regulatory decision making. In 2002, EPA issued its lnterim Policy on Genomics which stated that such data may be considered in the decision making process, but tha...
Social Studies. Grade Ten. Interim Guide.
ERIC Educational Resources Information Center
Manitoba Dept. of Education, Winnipeg. Curriculum Development Branch.
This social studies curriculum guide for grade 10 in Manitoba, Canada, examines the characteristics of the physical and social environments of North America and analyzes the interrelationships among them. The primary focus is on Canada and the United States with a secondary focus on Central America. The study has been divided into the following…
76 FR 16525 - Reorganization of Regulations on Control of Employment of Aliens
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-24
.... 3260-2011] RIN 1125-AA64 Reorganization of Regulations on Control of Employment of Aliens AGENCY... Aliens, 74 FR 2337 (Jan. 15, 2009). The Homeland Security Act of 2002, as amended, transferred the... about employment of aliens in the United States and did not discuss EOIR's interim rule. As neither...
International Standards. U.S. Metric Study Report.
ERIC Educational Resources Information Center
Huntoon, Robert D.; And Others
In this first interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, a series of conclusions and recommendations, based upon a national survey of the role of SI (System's International) units in international trade and other areas of foreign relations, includes the following…
This product is visuals for a platform presentation in support of already approved extended abstact for thisconference. Abstract: Environmentally responsible development of oil and gas assets in the United States is facilitated by advancement of sector-specific air pollution em...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-28
... information regarding recipients in the aggregate that does not identify specific individuals. However, a...-Income Persons: Maintaining the Privacy of Applicants for and Recipients of Services AGENCY: Office of.... Department of Energy (DOE) published an interim final rule on March 11, 2010, requiring that all States and...
78 FR 59163 - Rules of Practice for Issuance of Temporary Cease-and-Desist Orders
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-26
... any violation or practice specified in the notice of charges and to take affirmative action to prevent... the incomplete or inaccurate state of the books or records; or (2) Affirmative action to restore such... Financial Protection. ACTION: Interim final rule with request for public comment. SUMMARY: The Dodd-Frank...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... System Supervision (PWSS) programs to meet the requirements of the Safe Drinking Water Act (SDWA). The State of Rhode Island has adopted drinking water regulations for the Arsenic Rule (66 FR 6976... adopted drinking water regulations for the Interim Enhanced Surface Water Treatment Rule (63 FR 69477...
40 CFR 96.284 - Opt-in process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Opt-in Units... of interim review, if the plan appears to contain information demonstrating that the SO2 emissions... section, the owner or operator shall monitor and report the SO2 emissions rate and the heat input of the...
United States Air Force History. A Guide to Documentary Sources
1973-01-01
artificial limbs, crea- tive activity, and delegates to an interallied congress. The areas represented by aerial photographs are only partially identified...Interim Government of Korea, 154 477, 604 See also Korea, Korean War Hoover, J. Edgar, 604 Seas oeKra aHopkins, HEarr 8, 6 84, 3International Aeroplane Co
U.S. Metric Study Interim Report: Education.
ERIC Educational Resources Information Center
National Bureau of Standards (DOC), Washington, DC.
This report is another in the series being prepared on the numerous investigations comprising the U. S. Metric Study, by the U. S. National Bureau of Standards. This report concerns the effects of increasing worldwide use of the metric system on education in the United States. Its purpose is to present the educational advantages and disadvantages…
The Costs and Benefits of High Speed Vessels Relative to Traditional C-17 Military Airlift
2003-12-01
37 APPENDIX D SWOT Analysis...Port Action Officers Group IBCT Interim Brigade Combat Team LCS Littoral Combat Ship LST Landing ship tank LSV Logistics Support Vessel... SWOT Strength Weakness Opportunity Threat TACOM Tank and Automotive Command TSV Theater Support Vessel USS United States Ship USTRANSCOM
The Florida Child Care Quality Improvement Study. Interim Report.
ERIC Educational Resources Information Center
Howes, Carollee; And Others
An ongoing child care improvement study is being conducted of approximately 150 licensed child care providers in 4 Florida counties. The study is assessing the impact of state legislation, which mandated lower caregiver-to-child ratios and increased credentialing. Thus far, the study has found the following effects: (1) children's emotional and…
75 FR 10645 - Low Pathogenic Avian Influenza; Voluntary Control Program and Payment of Indemnity
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
...We are adopting as a final rule, with changes, an interim rule that amended the regulations by establishing, under the auspices of the National Poultry Improvement Plan, a voluntary program for the control of the H5/H7 subtypes of low pathogenic avian influenza in commercial poultry. As amended by this document, the rule provides that the amount of indemnity for which contract growers are eligible will be reduced by any payment they have already received on their contracts when poultry in their care are destroyed, clarifies the roles of cooperating State agencies with respect to H5/H7 low pathogenic avian influenza outbreaks, provides that consistency with humane euthanasia guidelines will be considered when selecting a method for the destruction of poultry, and provides additional guidance for cleaning and disinfecting an affected premises. The control program and indemnity provisions established by the interim rule are necessary to help ensure that the H5/H7 subtypes of low pathogenic avian influenza are detected and eradicated when they occur within the United States.
Tier One Performance Screen Initial Operational Test and Evaluation: 2012 Interim Report
2013-12-01
are known to predict outcomes in work settings. Because the TAPAS uses item response theory (IRT) methods to construct and score items, it can be...Qualification Test (AFQT), to select new Soldiers. Although the AFQT is useful for selecting new Soldiers, other personal attributes are important to...to be and will continue to serve as a useful metric for selecting new Soldiers, other personal attributes, in particular non-cognitive attributes
2006-10-01
for UAS pilot applicants to complete a limited period of manned aircraft flight training early in their training pipeline. Subsequently, there will...applicable for the initial period of manned aircraft flight training: Federal Aviation Administration third class medical standards or AF148-123V3... flight training could not be adequately addressed during training with unmanned aircraft. In the interim, the USAF has decided manned aircraft training is
EFFECTS OF EXTREME AND UNUSUAL CONDITIONS ON LANA ALLOYS: INTERIM REPORT, FY14 (U)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shanahan, Kirk L.
2014-04-25
The TTP proposed research aimed at determining: a) the rate at which these changes occurred and the effect of initial conditions, especially in the early phases of Hydrogen Heat Treatment (HHT), b) whether or not different LANA alloys would show similar effects, and c) whether common contaminants/poisons impacted LANA alloy hydride chemistry similarly to what had been found for Pd and Pd-alloy hydride chemistry.
Assessment of Proposed Cab Glass Coating for FAA Control Towers
2015-11-16
report would be prepared after the initial coating and evaluation (with sprayed water) and then a final report after the 6 month study period to assess...Distribution A: Approved for public release. AFRL-RH-WP-TR-2015-0074 Assessment of Proposed Cab Glass Coating for FAA Control...REPORT TYPE Interim 3. DATES COVERED (From - To) 30 Jun 2014 – 1 Nov 2015 4. TITLE AND SUBTITLE Assessment of Proposed Cab Glass Coating
2017-12-11
AFRL-RX-WP-JA-2017-0501 pH- DEPENDENT SPIN STATE POPULATION AND 19F NMR CHEMICAL SHIFT VIA REMOTE LIGAND PROTONATION IN AN IRON(II...From - To) 16 November 2017 Interim 24 January 2014 – 16 October 2017 4. TITLE AND SUBTITLE PH- DEPENDENT SPIN STATE POPULATION AND 19F NMR CHEMICAL...dx.doi.org/10.1039/C7CC08099A 14. ABSTRACT (Maximum 200 words) An FeII complex that features a pH- dependent spin state population, by virtue of a
Zhu, Jay-Jiguang; Demireva, Petya; Kanner, Andrew A; Pannullo, Susan; Mehdorn, Maximilian; Avgeropoulos, Nicholas; Salmaggi, Andrea; Silvani, Antonio; Goldlust, Samuel; David, Carlos; Benouaich-Amiel, Alexandra
2017-12-01
We characterized health-related quality of life (HRQoL), cognitive, and functional status in newly diagnosed glioblastoma (GBM) patients receiving Tumor treating fields (TTFields) with temozolomide (TMZ) versus TMZ alone in a planned interim analysis of a randomized phase III trial [NCT00916409], which showed significant improvement in progression-free and overall survival with TTFields/TMZ. After radiotherapy with concomitant TMZ, newly diagnosed GBM patients were randomized (2:1) to TTFields/TMZ (n = 210) or TMZ (n = 105). Interim analysis was performed in 315 patients with ≥18 months of follow-up. HRQoL, a secondary endpoint, was evaluated in per-protocol patient population and expressed as change from baseline (CFB) at 3, 6, and 9 months for each subscale in the EORTC QLQ-C30/BN20. Karnofsky performance scores (KPS) and Mini-Mental State Examination scores (MMSE) were assessed. CFB in HRQoL was balanced in treatment groups at the 12-month time point. Initially, HRQoL improved in patients treated with TTFields/TMZ (CFB3: 24% and CFB6: 13%) versus TMZ (CFB3: -7% and CFB6: -17%), though this difference was no longer evident at the 9-month point. General scales, including physical and social functioning, showed no difference at 9 and 12 months. TTFields/TMZ group reported higher concerns of "itchy skin". KPS over 12 months was just below 90 in both groups. Cognitive status (MMSE) was stable over time. HRQoL, KPS, and MMSE were balanced in both groups over time. There was no preliminary evidence that HRQoL, cognitive, and functional status is adversely affected by the continuous use of TTFields.
1983-12-01
The vegetation is typified by a variety of vines and shrubs , including dogwood, sumac, wild plum, honeysuckle, wild grape, blackberry, honey locust...demand analysis. The SCORP studies for Ohio, Indiana , and Michigan were reviewed since most of *the Maumee Bay visitation was expected to originate...Bay State Park by State, by Zone :Distance: Zone:In Miles: Ohio Michigan : Indiana :Pennsylvania: Canada 1 : 0-25 :Lucas :Monroe :None :None :None
NASA Astrophysics Data System (ADS)
Reusch, D. B.
2016-12-01
Any analysis that wants to use a GCM-based scenario of future climate benefits from knowing how much uncertainty the GCM's inherent variability adds to the development of climate change predictions. This is extra relevant in the polar regions due to the potential of global impacts (e.g., sea level rise) from local (ice sheet) climate changes such as more frequent/intense surface melting. High-resolution, regional-scale models using GCMs for boundary/initial conditions in future scenarios inherit a measure of GCM-derived externally-driven uncertainty. We investigate these uncertainties for the Greenland ice sheet using the 30-member CESM1.0-CAM5-BGC Large Ensemble (CESMLE) for recent (1981-2000) and future (2081-2100, RCP 8.5) decades. Recent simulations are skill-tested against the ERA-Interim reanalysis and AWS observations with results informing future scenarios. We focus on key variables influencing surface melting through decadal climatologies, nonlinear analysis of variability with self-organizing maps (SOMs), regional-scale modeling (Polar WRF), and simple melt models. Relative to the ensemble average, spatially averaged climatological July temperature anomalies over a Greenland ice-sheet/ocean domain are mostly between +/- 0.2 °C. The spatial average hides larger local anomalies of up to +/- 2 °C. The ensemble average itself is 2 °C cooler than ERA-Interim. SOMs extend our diagnostics by providing a concise, objective summary of model variability as a set of generalized patterns. For CESMLE, the SOM patterns summarize the variability of multiple realizations of climate. Changes in pattern frequency by ensemble member show the influence of initial conditions. For example, basic statistical analysis of pattern frequency yields interquartile ranges of 2-4% for individual patterns across the ensemble. In climate terms, this tells us about climate state variability through the range of the ensemble, a potentially significant source of melt-prediction uncertainty. SOMs can also capture the different trajectories of climate due to intramodel variability over time. Polar WRF provides higher resolution regional modeling with improved, polar-centric model physics. Simple melt models allow us to characterize impacts of the upstream uncertainties on estimates of surface melting.
Evaluation of Three Sites for the Global Nuclear Energy Partnership
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magette, T.E.; Turner, S.; Smalley, R.
The Global Nuclear Energy Partnership (GNEP) is an initiative managed by the United States Department of Energy (DOE) to work with other nations to develop and deploy advanced nuclear recycling and reactor technologies. The purpose of this initiative is to help provide reliable, emission-free energy with less waste burden of older technologies and without making available separated plutonium that could be used by rogue states or terrorists for nuclear weapons. In November 2006, DOE awarded multiple contracts to EnergySolutions to prepare separate siting studies to determine the possibility of hosting a Consolidated Fuel Treatment Center (CFTC) and/or an Advanced Burnermore » Reactor (ABR) at three proposed sites: The Atomic City Site in Bingham County, Idaho; the Roswell Site in Chaves County, New Mexico, and the Barnwell Site in Barnwell County, South Carolina. EnergySolutions prepared Detailed Siting Reports (DSRs) that describe the overall character of each site and its local environment in sufficient detail to understand how it could be affected by the proposed GNEP facilities. A comprehensive review of the potentially affected environment showed that there were no foreseeable environmental impacts or regulatory prohibitions that would prevent each of the sites from serving as an effective host for GNEP. Each site was found to be of sufficient size to locate either or both of the planned GNEP Demonstration Facilities and to have sufficient room to provide suitably sized feed buffer and interim waste product storage capability. All three sites had water rights and access to a reliable source of water to support site operations. In each case, there is strong local and state interest in and support for siting the proposed GNEP facilities. (authors)« less
Graiff, Lorenzo; Vigolo, Paolo
2012-04-01
Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The module describes enforcement procedures and cites the statutory authority and describes the two different types of enforcement (i.e., administrative and judicial). It explains when and how EPA can enforce the RCRA regulations in authorized states. It describes the enforcement mechanisms available to EPA. It states the differences between enforcement at interim status and permitted facilities. It describes enforcement at federal facilities and identifies relevant resource documents.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
The module describds enforcement procedures and cites the statutory authority. It describes the two different types of enforcement (i.e., administrative and judicial) and explains when and how EPA can enforce the RCRA regulations in authorized states. It describes the enforcement mechanisms available to EPA. It states the differences between enforcement at interim status, permitted facilities, and Federal facilities. It also identifies relevant resources documents.
75 FR 56601 - Privacy Act of 1974: New System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
...The Patient Protection and Affordable Care Act (the Affordable Care Act), Public Law 111-148, was enacted on March 23, 2010; the Health Care and Education Reconciliation Act (the Reconciliation Act), Public Law 111-152, was enacted on March 30, 2010. The Affordable Care Act and implementing regulations (codified in HHS interim final rules (IFR) at 45 CFR Part 147) require that non-grandfathered health insurance plans and issuers offering group and individual coverage have effective internal claims and appeals and external review processes. The effective date for these requirements is plan or policy years beginning on or after September 23, 2010. Regarding external review, the statute requires that health plans and issuers must comply with either a state external review process or a process meeting standards issued by the Secretary of Health and Human Services (HHS) that is ``similar to'' a state process meeting requirements in section 2719 (a ``federal external review process''). The IFR includes a transition period prior to July 1, 2011, during which time HHS will work with states to assist in making any necessary changes so that the state process will meet the minimum consumer protections identified in 45 CFR 147.136 that must be met in order for the state process to apply. During this interim period, health insurance issuers in states with external review laws in effect prior to September 23, 2010 will follow that state's external review law to the extent applicable. In states that have not passed an external review law that is in effect on September 23, 2010, a health insurance issuer must follow an interim federal external review process that will be administered by the Office of Personnel Management (OPM). The system of records will be created as OPM assists HHS by providing external reviews of adverse benefit determinations and final internal adverse benefit determinations as requested by eligible claimants and their authorized representatives (``claimants''). The system of records will include any data relevant to these external reviews, and OPM proposes to add this new system of records to its inventory of records systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended. This action is necessary to meet the requirements of the Privacy Act to publish in the Federal Register notice of the existence and character of records maintained by the agency (5 U.S.C. 552a(e)(4)).
Added value of dynamical downscaling of winter seasonal forecasts over North America
NASA Astrophysics Data System (ADS)
Tefera Diro, Gulilat; Sushama, Laxmi
2017-04-01
Skillful seasonal forecasts have enormous potential benefits for socio-economic sectors that are sensitive to weather and climate conditions, as the early warning routines could reduce the vulnerability of such sectors. In this study, individual ensemble members of the ECMWF global ensemble seasonal forecasts are dynamically downscaled to produce ensemble of regional seasonal forecasts over North America using the fifth generation Canadian Regional Climate Model (CRCM5). CRCM5 forecasts are initialized on November 1st of each year and are integrated for four months for the 1991-2001 period at 0.22 degree resolution to produce a one-month lead-time forecast. The initial conditions for atmospheric variables are obtained from ERA-Interim reanalysis, whereas the initial conditions for land surface are obtained from a separate ERA-interim driven CRCM5 simulation with spectral nudging applied to the interior domain. The global and regional ensemble forecasts were then verified to investigate the skill and economic benefits of dynamical downscaling. Results indicate that both the global and regional climate models produce skillful precipitation forecast over the southern Great Plains and eastern coasts of the U.S and skillful temperature forecasts over the northern U.S. and most of Canada. In comparison to ECMWF forecasts, CRCM5 forecasts improved the temperature forecast skill over most part of the domain, but the improvements for precipitation is limited to regions with complex topography, where it improves the frequency of intense daily precipitation. CRCM5 forecast also yields a better economic value compared to ECMWF precipitation forecasts, for users whose cost to loss ratio is smaller than 0.5.
Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F
2013-05-01
At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.
Publishing interim results of randomised clinical trials in peer-reviewed journals.
Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan
2017-02-01
Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.
Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung
2017-01-01
Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.
Guidance: Interim Municipal Settlement Policy
Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bullard, D.L.
1990-09-01
Within the Houston metropolitan area, a major commitment has been made to develop a system of physically separated transitways in the medians of the existing freeway network. These lanes are reserved for the exclusive use of high-occupancy vehicles. Phase 1 of the first completed transitway opened on the Katy Freeway (I-10W) in October 1984. Initially, only authorized buses and vanpools were designated as eligible users of the transitway. To encourage increased vehicular utilization of the facility, carpools were allowed to use the transitway on a test basis beginning in April 1985. The research study, sponsored by the Metropolitan Transit Authoritymore » of Harris County and the Texas State Department of Highways and Public Transportation, was initiated in order to conduct a comprehensive analysis of the effects of permitting carpools to use the transitway. The report documents data collected in October 1989, 4.5 years after carpool utilization of the transitway began. The report compares the 1989 data to similar data collected before carpool utilization was permitted (March 1985) and after carpool utilization was permitted (April 1986, October 1987, October 1988). These comparisons address numerous concerns and provide an indication of the effectiveness of allowing carpools onto the transitway.« less
Onsite 40-kilowatt fuel cell power plant manufacturing and field test program
NASA Technical Reports Server (NTRS)
1985-01-01
A joint Gas Research Institute and U.S. Department of Energy Program was initiated in 1982 to evaluate the use of fuel cell power systems for on-site energy service. Forty-six 40 kW fuel cell power plants were manufactured at the United Technologies Corporation facility in South Windsor, Connecticut, and are being delivered to host utilities and other program participants in the United States and Japan for field testing. The construction of the 46 fully-integrated power plants was completed in January 1985 within the constraints of the contract plan. The program has provided significant experience in the manufacture, acceptance testing, deployment, and support of on-site fuel cell systems. Initial field test results also show that these experimental power plants meet the performance and environmental requirements of a commercial specification. This Interim Report encompasses the design and manufacturing phases of the 40 kW Power Plant Manufacturing and Field Test program. The contract between UTC and NASA also provides UTC field engineering support to the host utilities, training programs and associated manuals for utility operating and maintenance personnel, spare parts support for a defined test period, and testing at UTC of a power plant made available from a preceding program phase. These activities are ongoing and will be reported subsequently.
A web-based endpoint adjudication system for interim analyses in clinical trials.
Nolen, Tracy L; Dimmick, Bill F; Ostrosky-Zeichner, Luis; Kendrick, Amy S; Sable, Carole; Ngai, Angela; Wallace, Dennis
2009-02-01
A data monitoring committee (DMC) is often employed to assess trial progress and review safety data and efficacy endpoints throughout a trail. Interim analyses performed for the DMC should use data that are as complete and verified as possible. Such analyses are complicated when data verification involves subjective study endpoints or requires clinical expertise to determine each subject's status with respect to the study endpoint. Therefore, procedures are needed to obtain adjudicated data for interim analyses in an efficient manner. In the past, methods for handling such data included using locally reported results as surrogate endpoints, adjusting analysis methods for unadjudicated data, or simply performing the adjudication as rapidly as possible. These methods all have inadequacies that make their sole usage suboptimal. For a study of prophylaxis for invasive candidiasis, adjudication of both study eligibility criteria and clinical endpoints prior to two interim analyses was required. Because the study was expected to enroll at a moderate rate and the sponsor required adjudicated endpoints to be used for interim analyses, an efficient process for adjudication was required. We created a web-based endpoint adjudication system (WebEAS) that allows for expedited review by the endpoint adjudication committee (EAC). This system automatically identifies when a subject's data are complete, creates a subject profile from the study data, and assigns EAC reviewers. The reviewers use the WebEAS to review the subject profile and submit their completed review form. The WebEAS then compares the reviews, assigns an additional review as a tiebreaker if needed, and stores the adjudicated data. The study for which this system was originally built was administratively closed after 10 months with only 38 subjects enrolled. The adjudication process was finalized and the WebEAS system activated prior to study closure. Some website accessibility issues presented initially. However, once these issues were resolved, the reviewers found the system user-friendly and easy to navigate. Web-based data adjudication depends upon expeditious data collection and verification. Further, ability to use web-based technologies, in addition to clinical expertise, must be considered in selecting EAC members. The automated nature of this system makes it a practical mechanism for ensuring timely endpoint adjudication. The authors believe a similar approach could be useful for handling endpoint adjudication for future clinical trials.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cummins, G.D.
This request is submitted to seek interim approval to operate a Toxic Substances Control Act (TSCA) of 1976 chemical waste landfill for the disposal of polychlorinated biphenyl (PCB) waste. Operation of a chemical waste landfill for disposal of PCB waste is subject to the TSCA regulations of 40 CFR 761. Interim approval is requested for a period not to exceed 5 years from the date of approval. This request covers only the disposal of small 10 quantities of solid PCB waste contained in decommissioned, defueled submarine reactor compartments (SRC). In addition, the request applies only to disposal 12 of thismore » waste in Trench 94 of the 218-E-12B Burial Ground (Trench 94) in the 13 200 East Area of the US Department of Energy`s (DOE) Hanford Facility. Disposal of this waste will be conducted in accordance with the Compliance 15 Agreement (Appendix H) between the DOE Richland Operations Office (DOE-RL) and 16 the US Environmental Protection Agency (EPA), Region 10. During the 5-year interim approval period, the DOE-RL will submit an application seeking final 18 approval for operation of Trench 94 as a chemical waste landfill, including 19 any necessary waivers, and also will seek a final dangerous waste permit from 20 the Washington State Department of Ecology (Ecology) for disposal of lead 21 shielding contained in the SRCS.« less
Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.
Dallas, Michael J
2008-01-01
Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.
Maegawa, Hiroshi; Tobe, Kazuyuki; Tabuchi, Hiromi; Nakamura, Ichiro
2016-10-01
To evaluate the efficacy and safety of ipragliflozin in real-world clinical practice in Japanese patients with type 2 diabetes. We conducted interim analyses at 3 months of a 3-year prospective study of patients who were first prescribed ipragliflozin between 17 July 2014 and 16 October 2015, and whose data were locked by 16 January 2016. Changes in glycemic control, blood pressure, and laboratory variables from baseline, and incidence of adverse drug reactions (ADRs). Of 11,412 patients initially registered, efficacy and safety data were available for 3481 (30.5%) and 4360 (38.2%) patients, respectively. Hemoglobin A1c and fasting plasma glucose decreased by 0.67% and 28.8 mg/dL, respectively, at 3 months/last assessment (both P < .001) from baseline (8.00% and 166.4 mg/dL, respectively). Blood pressure and lipid levels also improved significantly. There were 258 ADRs in 194 patients. The ADRs included 'renal and urinary disorders' (system organ class) in 110 patients (2.5%). These 3-month interim results indicate that ipragliflozin improved glycemic control, lipids, and blood pressure with low rates of ADRs in Japanese patients with type 2 diabetes in real-world clinical practice. The results were consistent with those of placebo-controlled, randomized clinical trials. Clinicaltrials.gov identifier: NCT02479399.
Mental health pharmacists as interim prescribers
2017-01-01
Introduction: Turnover leading to fluctuations in prescriber availability presents many challenges, most notably in access to and continuity of care. In 2015, the Veterans Affairs Eastern Colorado Healthcare System (VA ECHCS) experienced a period of significant mental health prescriber turnover leading to patient utilization of psychiatric emergency services (PES) for nonemergent medication management. The resulting increase in volume placed excessive stress on PES prescribers. Mental health pharmacists have opportunities to provide interim medication management while patients are between prescribers. Methods: This study was a retrospective, cohort study of patients unassigned to an outpatient mental health prescriber due to prescriber turnover, receiving care at VA ECHCS between October 1, 2015, and February 28, 2016. The primary outcome was the number of pharmacist interventions performed. Secondary outcomes characterize the interventions performed and describe the change in the mean monthly volume of patients presenting to PES. Results: In this veteran population, 152 interventions were performed in 81 unique patients. The most common intervention was prescription renewals (80%). Interventions most commonly involved antidepressants (28%), antipsychotics (10%), and mood stabilizers (10%). Before initiation of the clinic, Denver VA PES experienced a mean of 300 monthly visits. After clinic implementation, PES visits decreased significantly to a mean of 237 visits per month (P = .041). Discussion: The pharmacist interim prescriber clinic was associated with a significant decrease in mean number of patients seen per month in PES. The success of the clinic also contributed to interest by the mental health service to expand clinical pharmacy services.
NASA Astrophysics Data System (ADS)
Wegmann, Martin; Dutra, Emanuel; Jacobi, Hans-Werner; Zolina, Olga
2018-06-01
This study uses daily observations and modern reanalyses in order to evaluate reanalysis products over northern Eurasia regarding the spring snow albedo feedback (SAF) during the period from 2000 to 2013. We used the state-of-the-art reanalyses from ERA-Interim/Land and the Modern-Era Retrospective Analysis for Research and Applications version 2 (MERRA-2) as well as an experimental set-up of ERA-Interim/Land with prescribed short grass as land cover to enhance the comparability with the station data while underlining the caveats of comparing in situ observations with gridded data. Snow depth statistics derived from daily station data are well reproduced in all three reanalyses. However day-to-day albedo variability is notably higher at the stations than for any reanalysis product. The ERA-Interim grass set-up shows improved performance when representing albedo variability and generates comparable estimates for the snow albedo in spring. We find that modern reanalyses show a physically consistent representation of SAF, with realistic spatial patterns and area-averaged sensitivity estimates. However, station-based SAF values are significantly higher than in the reanalyses, which is mostly driven by the stronger contrast between snow and snow-free albedo. Switching to grass-only vegetation in ERA-Interim/Land increases the SAF values up to the level of station-based estimates. We found no significant trend in the examined 14-year time series of SAF, but interannual changes of about 0.5 % K-1 in both station-based and reanalysis estimates were derived. This interannual variability is primarily dominated by the variability in the snowmelt sensitivity, which is correctly captured in reanalysis products. Although modern reanalyses perform well for snow variables, efforts should be made to improve the representation of dynamic albedo changes.
Using evidence-based leadership initiatives to create a healthy nursing work environment.
Nayback-Beebe, Ann M; Forsythe, Tanya; Funari, Tamara; Mayfield, Marie; Thoms, William; Smith, Kimberly K; Bradstreet, Harry; Scott, Pamela
2013-01-01
In an effort to create a healthy nursing work environment in a military hospital Intermediate Care Unit (IMCU), a facility-level Evidence Based Practice working group composed of nursing.Stakeholders brainstormed and piloted several unit-level evidence-based leadership initiatives to improve the IMCU nursing work environment. These initiatives were guided by the American Association of Critical Care Nurses Standards for Establishing and Sustaining Healthy Work Environments which encompass: (1) skilled communication, (2) true collaboration, (3) effective decision making, (4) appropriate staffing, (5) meaningful recognition, and (6) authentic leadership. Interim findings suggest implementation of these six evidence-based, relationship-centered principals, when combined with IMCU nurses' clinical expertise, management experience, and personal values and preferences, improved staff morale, decreased staff absenteeism, promoted a healthy nursing work environment, and improved patient care.
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
76 FR 4369 - Special Law Enforcement Commissions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY... of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
Discrete Address Beacon System (DABS) Software System Reliability Modeling and Prediction.
1981-06-01
Service ( ATARS ) module because of its interim status. Reliability prediction models for software modules were derived and then verified by matching...System (A’iCR3BS) and thus can be introduced gradually and economically without ma jor olper- ational or procedural change. Since DABS uses monopulse...lineanaly- sis tools or are ured during maintenance or pre-initialization were not modeled because they are not part of the mission software. The ATARS
2011-01-01
Louis Chow, David Woodburn, Lei Zhou, Jared Bindl, Yang Hu, and Wendell Brokaw University of Central Florida JANUARY 2011 Interim Report...Magnet (PM) Motor % % Written in SI or MKS Unit System. % % Authors: % David Woodburn % Dr. Lei Zhou % Dr. Thomas X. Wu clear all...Initial phase winding resistance [ ohm ] id = 0; % Phase d current [A] iq = 0; % Phase q current [A] did_dt = 0
2010-05-01
textiles include “soft” body armor; spall liners for combat vehicles; flame protection garments; and protective braided sleeves for hoses and cable...summarizes the results of an Interim Base Case analysis of those materials as well. Chapter Four offers IDA’s initial ideas regarding opportunities that...process in the requirements analysis process by which the department determines the NDS goals, or stockpile requirements, it will recommend to the
2010-04-01
Exchanges of Services ( ATARES ); Strategic Airlift Interim Solution (SALIS); Strategic Airlift Capability (SAC); the European Air Transport Fleet (EATF... ATARES is a TA, established in order to facilitate the exchange of military capabilities based on equivalent flying hours with Lockheed C-130 Hercules...initiatives such as NATO PfP, EU BG, MNE, NAMSA, MCCE, ATARES , SALIS, and SAC. The participation in the EU BG concept was as one of the contributors
Evaluation of the Regional Educational Laboratories. Interim Report. NCEE 2013-4014
ERIC Educational Resources Information Center
Carlson, Elaine; Scott, Jenna; Zhang, Xiaodong; Gutmann, Babette; Sinclair, Beth
2013-01-01
The Regional Educational Laboratories (RELs) are a networked system of 10 organizations that serve the educational needs of 10 designated regions across the United States and its territories. The U.S. Department of Education (ED) is authorized by the Education Sciences Reform Act (ESRA) to award contracts to 10 RELs to support applied research,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-27
...] Publication of the Petition for Waiver From Samsung Electronics America, Inc. and Granting of the Interim... notice announces receipt of and publishes a petition for waiver from Samsung Electronics America, Inc... stated in the waivers that DOE granted to Mitsubishi Electric & Electronics America USA, Inc. (Mitsubishi...
Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action
1991-09-30
4. TITLE AND SUBTITLE 5 . FUNDING NUMBERS Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action 6. AUTHOR(S) Sam Capps Rupe, Major -1...Interim Status for TSD Facilities .................... 19 5 . Closure and Postclosure Requirements for TSD Facilities ........... 25 D. State Role... 65 1. RCRA Facility Assessment . ............................... 65 2. RCRA Facility Investigation . .............................. 66 3
Midcycle survey of Arkansas' forest resources
Roy C. Beltz; Randall Leister; Walter R. Smith
1987-01-01
This report summarizes an interim survey of Arkansasâ forest resources. Field work was completed in April 1985. The survey provides new estimates of forest area and inventory for both the Stateâs softwoods and hardwoods. This survey was cooperative effort with the Arkansas forestry commission, the soil conservation service, the statistical reporting service, and the...
Polyphosphazene Solid Electrolytes.
1984-10-01
soL..I’IIN ’ . LAV A - .:.u.s 009 ’-" 4. T .. T. edSutoe .TVCO EO T EI O Polyphosphazene Solid Electrolytes Interim Technical Repor 6. PEAFORMING RG ...Y. T.; Whitmore , D. H. Solid State Ionics 1982, 7, 129. (10) Bauerle, J. E. J. Phys. Chem. Solids 1969, 30, 2657. (11) MacDonald, J. R. J. Chem. Phys
Urban gardening and agriculture is of increasing interest as a land revitalization option for interim as well as long term use, and is receiving increased attention, funding, and promotiion under EPA's Brownfields land redevelopment efforts. A broad range of state and local gove...
The Agency is promulgating an interim final rule revising the definition of wastes subject to the F037 and F038 listings to state that sludges from non-contact, once-through cooling waters are not included.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-22
... (see FAR 25.408). II. Discussion and Analysis This interim rule adds Colombia to the definition of...,000 for construction. Because the Colombia FTA construction threshold of $7,777,000 is the same as the... states that acquisitions that do not exceed $150,000 (with some exceptions) are automatically reserved...
ERIC Educational Resources Information Center
Nebraska Legislative Council, Lincoln. Legislative Research Div.
During the spring of 1987, the National Conference of State Legislatures awarded the Nebraska Legislature a cost-sharing award to study local school evaluation processes. Embodied in Legislative Resolution 181, which has the purpose of studying school evaluation procedures, the study attempts to provide legislators, educators, local school…
Environmentally responsible development of oil and gas assets in the United States is facilitated by advancement of sector-specific air pollution emission measurement and modeling tools. Emissions from upstream oil and gas production are complex in nature due to the variety of e...
Using Scientific Information to Develop Management Strategies for Commercial Redwood Timberlands
Jeffrey C. Barrett
2007-01-01
In 1999, PALCO (Pacific Lumber Company), a private landowner, and the state and federal governments agreed to implement a unique Habitat Conservation Plan (HCP) on 89,000 hectares of commercial redwood and Douglas-fir timberlands in Humboldt County, California. The aquatics portion of the PALCO HCP contains a set of "interim" conservation strategies developed...
Review of ride quality technology needs of industry and user groups
NASA Technical Reports Server (NTRS)
Mckenzie, J. R.; Brumaghim, S. H.
1975-01-01
A broad survey of ride quality technology state-of-the-art and a review of user evaluation of this technology were conducted. During the study 17 users of ride quality technology in 10 organizations representing land, marine and air passenger transportation modes were interviewed. Interim results and conclusions of this effort are reported.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-05
... CERCLA with respect to past response costs, the interim remedy for volatile organic compounds, or for... Justice Department Web site: http://www.usdoj.gov/enrd/Consent_Decrees.html . We will provide a paper copy... United States Treasury. For a paper copy without the exhibits and signature pages, the cost is $5.50...
The School Finance Redesign Project: A Synthesis of Work to Date. Interim Summary Report
ERIC Educational Resources Information Center
Hill, Paul T.
2008-01-01
In the past decade, controversies about public spending on education have grown as states adopted performance standards pledging that every child will learn enough to become an independent productive citizen and as "No Child Left Behind" ("NCLB") has put teeth into those expectations. Educators say that meeting higher standards requires more…
State-Wide Evaluation of the New Hampshire ESEA Title II, Part D Grant Program. Interim Report
ERIC Educational Resources Information Center
Knestis, Kirk; Smoke-Zur, Naomi; Higgins, Cathy
2010-01-01
The Title II-D grant program, "Enhancing Education Through Technology," (EETT) provides financial assistance to higher poverty school districts that have the greatest need for technology support or have been identified as being in need of improvement. In 2009, the American Reinvestment and Recovery Act (ARRA) provided an additional $650…
DOT National Transportation Integrated Search
2003-12-01
Maine has a variety of soil types throughout the state. Most of these soil types degrade rapidly and have : poor stability. To eliminate the cost of supplying quality road base material from a distant source and : increase the stability of existing s...
DOT National Transportation Integrated Search
2006-10-01
Maine has a variety of soil types throughout the state. A majority of these soil types degrade rapidly and : have poor stability. To eliminate the cost of supplying quality road base material from a distant source and : increase the stability of exis...
2009-01-01
Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383
Benzoates intakes from non-alcoholic beverages in Brazil, Canada, Mexico and the United States.
Martyn, Danika; Lau, Annette; Darch, Maryse; Roberts, Ashley
2017-09-01
Food consumption data from national dietary surveys were combined with brand-specific-use levels reported by beverage manufacturers to calculate the exposure to benzoic acid and its salts (INS Nos 210-213) from non-alcoholic beverages in Brazil, Canada, Mexico and the United States. These four jurisdictions were identified as having some of the most prevalent use of benzoates in beverages globally. Use levels were weighted according to the brand's market volume share in the respective countries. Benzoates were reported to be used primarily in 'water-based flavoured drinks' (Codex General Standard for Food Additives (GSFA) category 14.1.4). As such, the assessments focused only on intakes from these beverage types. Two different models were established to determine exposure: probabilistic (representing non-brand loyal consumers) and distributional (representing brand-loyal consumers). All reported-use levels were incorporated into both models, including those above the Codex interim maximum benzoate use level (250 mg kg -1 ). The exception to this was in the brand-loyal models for consumers of regular carbonated soft drinks (brand loyal category) which used (1) the interim maximum use level for beverages with a pH ≤ 3.5 and (2) all reported use levels for beverages pH > 3.5 (up to 438 mg kg -1 ). The estimated exposure levels using both models were significantly lower than the ADI established for benzoates at the mean level of intake (4-40% ADI) and lower than - or at the ADI only for toddlers/children - at the 95th percentile (23-110% ADI). The results rendered in the models do not indicate a safety concern in these jurisdictions, and as such provide support for maintaining the current Codex interim maximum benzoate level of 250 mg kg -1 in water-based beverages.
NASA Technical Reports Server (NTRS)
Reichle, Rolf; Koster, Randal; DeLannoy, Gabrielle; Forman, Barton; Liu, Qing; Mahanama, Sarith; Toure, Ally
2011-01-01
The Modern-Era Retrospective analysis for Research and Applications (MERRA) is a state-of-the-art reanalysis that provides. in addition to atmospheric fields. global estimates of soil moisture, latent heat flux. snow. and runoff for J 979-present. This study introduces a supplemental and improved set of land surface hydrological fields ('MERRA-Land') generated by replaying a revised version of the land component of the MERRA system. Specifically. the MERRA-Land estimates benefit from corrections to the precipitation forcing with the Global Precipitation Climatology Project pentad product (version 2.1) and from revised parameters in the rainfall interception model, changes that effectively correct for known limitations in the MERRA land surface meteorological forcings. The skill (defined as the correlation coefficient of the anomaly time series) in land surface hydrological fields from MERRA and MERRA-Land is assessed here against observations and compared to the skill of the state-of-the-art ERA-Interim reanalysis. MERRA-Land and ERA-Interim root zone soil moisture skills (against in situ observations at 85 US stations) are comparable and significantly greater than that of MERRA. Throughout the northern hemisphere, MERRA and MERRA-Land agree reasonably well with in situ snow depth measurements (from 583 stations) and with snow water equivalent from an independent analysis. Runoff skill (against naturalized stream flow observations from 15 basins in the western US) of MERRA and MERRA-Land is typically higher than that of ERA-Interim. With a few exceptions. the MERRA-Land data appear more accurate than the original MERRA estimates and are thus recommended for those interested in using '\\-tERRA output for land surface hydrological studies.
Filipino veterans' benefits improvements. Interim final rule.
2001-12-27
This document amends Department of Veterans Affairs (VA) adjudication regulations to reflect changes made by the Departments of Veterans Affairs and Housing and Urban Development, and Independent Agencies Appropriations Act, 2001, which changed the rate of compensation payments to certain Filipino veterans residing in the United States and the Veterans Benefits and Health Care Improvement Act of 2000, which changed the amount of the burial benefit paid to the survivors of certain Filipino veterans who were residing in the United States at the times of their deaths.
Bengtsson, Bengt-Ola S
2013-08-01
The Articles of Confederation and Perpetual Union was the interim constitution of the United States of America between 1777 and 1789. The name the United States of America is encountered here for the first time. Three physicians were among the 48 signers - Josiah Bartlett, Samuel Holten and Nathaniel Scudder. All three men started out studying and practising medicine but their lives took very different turns as the new nation emerged.
Stennis Space Center, State of Louisiana Extend Partnerships
2003-10-07
NASA Stennis Space Center (SSC) Interim Center Director Michael Rudolphi (second from right) presents Louisiana Gov. Mike Foster (second from left) an image from space of the area that comprised the Louisiana Purchase. Gov. Foster and Rudolphi signed a Memorandum of Understanding (MOU) between SSC and the state of Louisiana to promote technology transfer partnerships. Also pictured are Charles D'Agostino (left), executive director of the Louisiana Business and Technology Center, and Don Hutchison, secretary of the Louisiana Department of Economic Development.
2011-01-30
Basrah now.”This state- ment by a representative from the gover - nor’s office sums up the current invest- ment climate in Basrah—one of improving...other commercial invest- ment projects, including those in agriculture, tourism , and industry.425 Still, Iraq remains a difficult place to dobusiness...not U.S. appropriations—specifically those identified as “Interim Iraq Goverment Funds” [sic] and “Iraqi Cmdr’s Emrgcy Resp Prog” in the Fund Type
Stennis Space Center, State of Louisiana Extend Partnerships
NASA Technical Reports Server (NTRS)
2003-01-01
NASA Stennis Space Center (SSC) Interim Center Director Michael Rudolphi (second from right) presents Louisiana Gov. Mike Foster (second from left) an image from space of the area that comprised the Louisiana Purchase. Gov. Foster and Rudolphi signed a Memorandum of Understanding (MOU) between SSC and the state of Louisiana to promote technology transfer partnerships. Also pictured are Charles D'Agostino (left), executive director of the Louisiana Business and Technology Center, and Don Hutchison, secretary of the Louisiana Department of Economic Development.
42 CFR 417.574 - Interim settlement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...
14 CFR 136.41 - Interim operating authority.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...
14 CFR 136.41 - Interim operating authority.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
10 CFR 590.403 - Emergency interim orders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...
EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.
EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.
49 CFR 37.193 - Interim service requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...
76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...
EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn
2010-06-01
This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.
USDA Snack Policy Implementation: Best Practices From the Front Lines, United States, 2013-2014.
Asada, Yuka; Chriqui, Jamie; Chavez, Noel; Odoms-Young, Angela; Handler, Arden
2016-06-16
The Smart Snacks in Schools interim final rule was promulgated by the US Department of Agriculture (USDA) as authorized by the Healthy, Hunger-Free Kids Act of 2010 (PL 111-296) and implementation commenced beginning July 1, 2014; however, in the years leading up to this deadline, national studies suggested that most schools were far from meeting the USDA standards. Evidence to guide successful implementation of the standards is needed. This study examined snack policy implementation in exemplary high schools to learn best practices for implementation. Guided by a multiple case study approach, school professionals (n = 37) from 9 high schools across 8 states were recruited to be interviewed about perceptions of school snack implementation; schools were selected using criterion sampling on the basis of the HealthierUS Schools Challenge: Smarter Lunchrooms (HUSSC: SL) database. Interview transcripts and internal documents were organized and coded in ATLAS.Ti v7; 2 researchers coded and analyzed data using a constant comparative analysis method to identify best practice themes. Best practices for snack policy implementation included incorporating the HUSSC: SL award's comprehensive wellness approach; leveraging state laws or district policies to reinforce snack reform initiatives; creating strong internal and external partnerships; and crafting positive and strategic communications. Implementation of snack policies requires evidence of successful experiences from those on the front lines. As federal, state, and local technical assistance entities work to ensure implementation of the Smart Snacks standards, these best practices provide strategies to facilitate the process.
78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...
78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-13
... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...
24 CFR 115.207 - Consequences of interim certification and certification.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...
NUT Midline Carcinoma in Elderly Patients: Usefulness of 18F-FDG PET/CT for Treatment Assessment.
Kawase, Takatsugu; Naka, Go; Kubota, Kazuo; Sakashita, Baku; Takeda, Yuichiro
2015-09-01
Nuclear protein in testis (NUT) midline carcinoma is a rare disease that generally arises in adolescents and young adults. However, we encountered a rare NUT midline carcinoma case in an elderly patient. F-2-fluoro-2-deoxyglucose positron emission tomography/computed tomography (PET/CT) studies were performed before and during the treatment course. In this case, the initial PET/CT study revealed locoregional hypermetabolism in the mediastinal lesion. After then, the interim PET/CT study indicated a clear diminishing response to the initial treatment, whereas the residual masses were morphologically observable. Nuclear imaging may allow visualization of the therapeutic effect of antineoplastic therapies in both young and elderly patients.
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-22
... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-28
..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...
Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, J.
2002-06-18
The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.
ERIC Educational Resources Information Center
Nugent, Patricia A.
2011-01-01
The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…
Presidential Transition: The Experience of Two Community College Interim Presidents
ERIC Educational Resources Information Center
Thompson, Matthew D.
2010-01-01
The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...
17 CFR 210.10-01 - Interim financial statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...
78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...
75 FR 66553 - Truth in Lending
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...
Staff Reactions to Interim Leadership in a Student Affairs Organization
ERIC Educational Resources Information Center
Jones, Robin D.
2011-01-01
Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…
Faculty and Student Views of the Interim Term
ERIC Educational Resources Information Center
Centra, John A.; Sobol, Marion G.
1974-01-01
Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)
12 CFR 541.18 - Interim Federal savings association.
Code of Federal Regulations, 2010 CFR
2010-01-01
... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...
15 CFR 904.322 - Interim action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...
15 CFR 904.322 - Interim action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...
Into the Sunset: Reflections of an Interim Administrator.
ERIC Educational Resources Information Center
Marlowe, John
2000-01-01
One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)
2015-09-30
1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-01-01
This bill amends the Solid Waste Disposal Act to change the deadlines when facilities must certify that they are in compliance with the financial requirements of the Act; i.e., that they have obtained appropriate insurance policies and other protection as required by law. The bill delays compliance during interim status in terms of groundwater monitoring, with interim status terminating on November 8, 1987. The bill covers facilities which were in compliance, but whose insurance policies were later cancelled, those with revenues in the July 1981-1982 fiscal year of less than $5 million, those in states whose requirement came into effectmore » after November 8, 1984, and those which can document a good-faith effort to comply.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walsh, L.E.
1993-08-04
In October and November 1986, two secret U.S. Government operations were publicly exposed, potentially implicating Reagan Administration officials in illegal activities. These operations were the provision of assistance to the military activities of the Nicaraguan contra rebels during an October 1984 to October 1986 prohibition on such aid, and the sale of U.S. arms to Iran in contravention of stated U.S. policy and in possible violation of arms-export controls. In late November 1986, Reagan Administration officials announced that some of the proceeds from the sale of U.S. arms to Iran had been diverted to the contras. As a result, Attorneymore » General Edwin Meese III sought the appointment of an independent counsel to investigate and prosecute possible crimes. Volume II contains indictments, plea agreements, interim reports to Congress and administrative matters from that investigation.« less
2007-01-31
FP) missions. These missions are broadly categorized by sizes and associated platforms (not all inclusive) as shown in Table 2. UAV greater than...initiative and the Marines’ interim small unit remote scouting system (I-SURSS) requirement. The potential Navy version is referred to as Sea ALL . Dragon...wingspan, about seven inches long) that can stay in the air for about an hour. Once the battery powered propeller is spinning, the operator throws
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-19
... textile and apparel safeguard provision, provided for in Article 4.1 of the United States-Korea Free Trade... elimination of a customs duty under the Agreement, a Korean textile or apparel article is being imported into... for that article, and under such conditions as to cause serious damage or actual threat thereof to a U...
Evaluation Design 1978-1979: ESAA Title I Migrant Program. Publication Number 78.11.
ERIC Educational Resources Information Center
Friedman, Myron; And Others
To collect and disseminate information relevant to the accountability and program components of the Title I Migrant Program in the Austin school district and to report to the Texas Education Agency through interim and final reports on how well the migrant program is meeting its stated objectives for 1978-79 are the functions of the evaluation for…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... connection with a temporary labor certification for use in petitioning the Department of Homeland Security to... not affect the Interim Final Rule, 78 FR 24047, published on April 24, 2013, establishing the current... States (U.S.) workers recruited in connection with a temporary labor certification for use in petitioning...
ERIC Educational Resources Information Center
Martin, Christopher
2014-01-01
In February 2012, Canada's Truth and Reconciliation Commission released an interim report that detailed its findings based on extensive testimony by former students of the nation's residential school system, a system designed to forcibly assimilate aboriginal peoples. The report concludes that the state must play an active role in the restoration…
The Air Quality Assessment Final Report is intended for managers and scientists working on air quality to provide them with information on the potential effects of climate change on regional air quality in the United States.
75 FR 27383 - CSX Transportation, Inc.-Abandonment Exemption-in Marion County, IN.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-14
... Running Track, in Indianapolis, Marion County, Ind. The line traverses United States Postal Service Zip... interim trail use. Any request for a public use condition under 49 CFR 1152.28 or for trail use/rail banking under 49 CFR 1152.29 will be due no later than June 3, 2010. Each trail use request must be...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-30
... illustrate the limitation on the value of education awards an individual may receive, the preamble stated that a person who had previously earned the aggregate value of 1.71 awards could enroll in a quarter... interim final rule by revising the preamble language providing an example of the aggregate value of...
ERIC Educational Resources Information Center
Matsanka, Christopher
2017-01-01
The purpose of this non-experimental quantitative study was to investigate the relationship between Pennsylvania's Classroom Diagnostic Tools (CDT) interim assessments and the state-mandated Pennsylvania System of School Assessment (PSSA) and to create linear regression equations that could be used as models to predict student performance on the…
An Analysis of New Foreign Student Related Provisions in Federal and State Laws and Regulations.
ERIC Educational Resources Information Center
Connecticut State Board of Governors for Higher Education, Hartford.
In May 2002, President Bush signed in to law the Enhanced Border Security and Visa Reform Act (Public Law No. 107-173), which contains provisions that will affect foreign students and colleges and universities. In addition, the U. S. Immigration and Naturalization Service (INS) has implemented proposed and interim regulations that affect visa…
ERIC Educational Resources Information Center
Colorado State General Assembly, Denver. Legislative Council.
The Interim Committee on Teacher Evaluation and Dismissal was established by (Colorado) Senate Joint Resolution 97-14 to study the state's teacher evaluation and dismissal laws and explore alternatives. The committee was directed to study the relationship between education reform and employment protections for teachers; the effectiveness of adding…
ERIC Educational Resources Information Center
Mitzel, Harold E.
In cooperation with the United States Navy, this project was undertaken to examine the feasibility of computer assisted instruction in clinical malaria recognition, to train a small group of Naval personnel in techniques of creating and presenting such material, and to evaluate the course by giving it to a representative sample of Naval medical…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-05
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-08
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...