Sample records for interim response action

  1. 78 FR 59726 - Interim Final Appendix D of OMB Circular No. A-123, “Management's Responsibility for Internal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... OFFICE OF MANAGEMENT AND BUDGET Interim Final Appendix D of OMB Circular No. A-123, ``Management's Responsibility for Internal Control,'' and Suspension of Application of OMB Circular No. A-127, ``Financial Management Systems'' September 27, 2013. ACTION: Notice. SUMMARY: OMB Circular No. A-123, ``Management's...

  2. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  3. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  4. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  5. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  6. 76 FR 58311 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... nuclear power plants. In response to a request from the Nuclear Energy Institute (NEI), the NRC is... NUCLEAR REGULATORY COMMISSION [NRC-2011-0191] Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Draft...

  7. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  8. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  9. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  10. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  11. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  12. Annual Summary Report Calendar Year 2000 for the 100-HR-3, 100-KR-4, and 100-NR-2 Operable Units and Pump-and-Treat Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. B. Mitchem

    2001-08-22

    This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.

  13. Federal enforcement in group and individual health insurance markets. Final rule.

    PubMed

    2005-11-25

    This rule makes final an interim final rule that details procedures we use for enforcing title XXVII of the Public Health Service Act as added by the Health Insurance Portability and Accountability Act of 1996, and as amended by the Mental Health Parity Act of 1996, the Newborns' and Mothers' Health Protection Act of 1996, and the Women's Health and Cancer Rights Act of 1998. Specifically, we are responsible for enforcing title XXVII requirements in States that do not enact the legislation necessary to enforce those requirements, or otherwise fail to substantially enforce the requirements. We are also responsible for taking enforcement actions against non-Federal governmental plans. The regulation describes the process we use in both enforcement contexts. This final rule deletes an appendix to the interim rule that listed examples of violations of title XXVII and corrects the description of a cross-reference, but makes no substantive changes to the interim final rule.

  14. GUIDE TO CONDUCTING TREATABILITY STUDIES UNDER CERCLA: SOIL WASHING - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and Liab...

  15. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: SOLVENT EXTRACTION - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation and Liabi...

  16. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: THERMAL DESORPTION - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and Liab...

  17. 76 FR 12550 - Lavatory Oxygen Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim final rule... related to the provisioning of supplemental oxygen inside lavatories. This action is necessitated by other mandatory actions that temporarily render such oxygen systems inoperative. DATES: This interim rule is...

  18. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...

  19. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less

  20. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  1. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  2. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  3. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  4. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  5. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. Shanklin

    2006-07-19

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13,more » Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.« less

  6. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...

  7. Response Action Plan for the Basin F Interim Response Action Waste Pile.

    DTIC Science & Technology

    1992-10-01

    the Waste Pile via an 8-Inch diameter HDPE stand pipe. A stainless - steel submersible pump provides the lift to deliver the collected liquid 5 to the...2.1.4 Settlement Measuring System 3 Nine settlement plates were installed at the base of the Waste Pile during its construction. A 1-Inch steel pipe...PLATE STEEL CONDUIT. PIPE GS: 5219.61 GS: 5219.98 GS: 5219.56 GS: 5219.50 SPSP: 5217.87 SPSP: 5217.94 SPSP: 5218.59 THP: 5221.25 THP: 5221.41 THP

  8. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent frommore » buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project`s cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion.« less

  9. 76 FR 74831 - Aging Management of Stainless Steel Structures and Components in Treated Borated Water

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... exposed to treated borated water. In response to a request from the Nuclear Energy Institute (NEI), the... NUCLEAR REGULATORY COMMISSION [NRC-2011-0256] Aging Management of Stainless Steel Structures and Components in Treated Borated Water AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff...

  10. 76 FR 14559 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...

  11. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC...

  12. Report of the Michigan Interim Action Committee on Indian Problems.

    ERIC Educational Resources Information Center

    Adams, Doris; And Others

    Stressing the importance of American Indian involvement in affairs affecting Michigan's Indian population, this report by the Interim Action Committee on Indian Problems presents recommendations relative to education, employment, health, and the Commission on Indian Affairs. Recommendations for the commission emphasize: leadership at the local,…

  13. 75 FR 29183 - Office of the Chief Financial Officer; Department of Agriculture Implementation of OMB Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... participants in lower-tier covered transactions with whom I intend to do business? Subpart D--Responsibilities... exclusions from covered transactions and codifies a statutory permanent debarment provision. This action also... transactions. Finally, this interim rule implements Section 14211 of the Food, Conservation, and Energy Act of...

  14. 77 FR 72738 - Contracts and Provider Agreements for State Home Nursing Home Care

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... State Home Nursing Home Care AGENCY: Department of Veterans Affairs. ACTION: Interim final rule. SUMMARY... into contracts or provider agreements with State homes for the nursing home care of certain disabled... submitted in response to ``RIN 2900-AO57--Contracts and Provider Agreements for State Home Nursing Home Care...

  15. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less

  16. 76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...

  17. 78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...

  18. 78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...

  19. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...

  20. 75 FR 66553 - Truth in Lending

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...

  1. Environmental Quality Technology Demonstration, Evaluation and Transfer Activities

    DTIC Science & Technology

    1996-12-02

    and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft

  2. The Challenge of Declining Enrolments. Critical Emerging Problems and Recommendations for Immediate Action. Interim Report No. 2. [La Baisse des Effectifs Scolaires. Problemes Critiques et Recommandations pour une Action Immediate. Rapport Preliminaire No. 2].

    ERIC Educational Resources Information Center

    Jackson, Robert W. B.

    This second interim report on declining enrollment in Ontario identifies the major implications of the several factors associated with declining enrollments and makes recommendations for immediate action to contribute to the stability of the system while preparing and initiating long-term policies. The first part of the report deals with…

  3. Superfund record of decision (EPA Region 4): T. H. Agriculture and Nutrition Site, operable unit 1, Montgomery, AL, April 17, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    This decision document presents the selected interim remedial action for the T H Agriculture and Nutrition (THAN) Site, Montgomery, Alabama. This interim remedial action employs the use of extraction wells combined with a pump and treat system to prevent further migration of contaminated groundwater from the Site and to initiate groundwater restoration pending completion of the RI/FS and implementation of the final remedial action.

  4. 75 FR 54526 - Defense Federal Acquisition Regulation Supplement; Payment of Costs Prior to Definitization...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...

  5. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...

  6. Rocky Mountain Arsenal, Sanitary Sewer Interim Response Action, Construction Documents for New Sanitary Sewer Construction. Volume 2

    DTIC Science & Technology

    1990-05-01

    curves ; test reports; test cylinders: samples, O&M manuals including parts lists; certifications; warranties and other such required submittals...purpose. 14.4.3. Authority and responsibilities of all quality control personnel. 14.4.4. Schedule of Use of inspection personnel by types and phase of...quality control program shall include four phases of inspection and tests. The Contracting Officer’s representative shall be notified at least 24

  7. 78 FR 53038 - Interim Final Determination to Stay and Defer Sanctions; California; San Joaquin Valley

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0534; FRL-9900-36-Region 9.... Environmental Protection Agency (EPA). ACTION: Interim final rule. SUMMARY: EPA is making an interim [email protected] . Mail or deliver: Frances Wicher (AIR-2), U.S. Environmental Protection Agency Region 9...

  8. 76 FR 5564 - Grant of Interim Extension of the Term of U.S. Patent No. 4,971,802; MIFAMURTIDE

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... DEPARTMENT OF COMMERCE Patent and Trademark Office [Docket No. PTO-P-2011-0001] Grant of Interim... Office, Commerce. ACTION: Notice of interim patent term extension. SUMMARY: The United States Patent and... States Patent and Trademark Office. [FR Doc. 2011-2088 Filed 1-31-11; 8:45 am] BILLING CODE 3510-16-P ...

  9. Implementation of the Recommendations of the Presidential Commission on the Space Shuttle Challenger Accident

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This final status report describes the actions taken by NASA in response to the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident (Mission 51-L). The Commission recommendations and NASA's responses to them are summarized in the Executive Summary, which is accompanied by a schedule showing significant program milestones. A detailed discussion of the activities undertaken by NASA to implement each of the nine Commission recommendations is included and other related NASA actions required for safe return to flight are discussed. A copy of the interim plan submitted to the President one year ago and other significant reference documents are included as appendixes.

  10. 75 FR 77733 - Federal Acquisition Regulation; Preventing Abuse of Interagency Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Aeronautics and Space Administration (NASA). ACTION: Interim rule with request for comments. SUMMARY: The..., including economies and efficiencies and the ability to leverage resources. This interim rule, which...

  11. 75 FR 7955 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists..., Engineering Management Branch, Mitigation Directorate, Federal Emergency Management Agency, 500 C Street SW...

  12. 76 FR 49674 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ... in their floodplain management requirements. The community may at any time enact stricter... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  13. The role and challenges of the food industry in addressing chronic disease

    PubMed Central

    2010-01-01

    Summary Increasingly, food companies play an important role in stemming the rising burden of nutrition-related chronic diseases. Concrete actions taken by these companies include global public commitments to address food reformulation, consumer information, responsible marketing, promotion of healthy lifestyles, and public-private partnerships. These actions are reviewed together with eleven specific PepsiCo goals and commitments that address products, the marketplace, and communities at large. Interim progress on these goals and commitments are discussed as well as constraints hampering faster progress. Further disease prevention depends on increasing implementation of private-public initiatives. PMID:20509876

  14. Hydrazine Blending and Storage Facility, Interim Response Action Implementation. Final Safety Plan

    DTIC Science & Technology

    1989-08-30

    operators and visitors, will be required to wear a personal hydrazine dosimeter at all times. These will be available from commercial sources and/or the Naval...suspectea or carcinogenic pocen:tal for =an. -- t, :t ha a,,-cn OSL ?:L. Is I pPm or 1.3 mg/m 3 . zo pp=n4p"NIOSI. (1978) hs a oe -nded a ceiling level

  15. Data breaches. Final rule.

    PubMed

    2008-04-11

    This document adopts, without change, the interim final rule that was published in the Federal Register on June 22, 2007, addressing data breaches of sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). This final rule implements certain provisions of the Veterans Benefits, Health Care, and Information Technology Act of 2006. The regulations prescribe the mechanisms for taking action in response to a data breach of sensitive personal information.

  16. 75 FR 41381 - Private Land Mobile Radio Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ...] Private Land Mobile Radio Services AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY... to the January 1, 2011 interim deadlines associated with the narrowbanding of private land mobile... to the January 1, 2011 interim deadlines associated with the narrowbanding of private land mobile...

  17. 75 FR 7956 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA-2010-0003; Internal Agency Docket No. FEMA-B-1073] Changes in Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  18. 76 FR 20556 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... stringent in their floodplain management requirements. The community may at any time enact stricter... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  19. 76 FR 43601 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... stringent in their floodplain management requirements. The community may at any time enact stricter... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  20. 77 FR 11385 - Security Considerations for Lavatory Oxygen Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Considerations for Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim... considerations for lavatory oxygen systems (77 FR 12550). The interim final rule addresses a security... oxygen systems installed inside the lavatories of most transport category airplanes. As a result, the FAA...

  1. 76 FR 59066 - Notice of Regulatory Review Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... [No. 2011-N-10] Notice of Regulatory Review Plan AGENCY: Federal Housing Finance Agency. ACTION... of and requesting comments on the FHFA interim regulatory review plan for review of existing... comments on all aspects of the interim regulatory review plan, including legal and policy considerations...

  2. 76 FR 68322 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  3. 75 FR 18082 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  4. 75 FR 29210 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  5. 76 FR 21662 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  6. 75 FR 81889 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  7. 76 FR 21660 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  8. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of.... We strongly urge you not to include in your comments any personal information, such as Social...

  9. Superfund record of decision (EPA Region 6): Longhorn Army Ammunition Plant, IHAAP 12 and 16 Landfills, Karnack, TX, September 27, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This decision document presents the selected Early Interim Remedial Action for the LHAAP 12 and 16 landfills, Longhorn Army Ammunition Plant (LHAAP), Karnack, Texas. The Record of Decision for the sites addresses an Early Interim Remedial Action. The selected remedy consists of a multilayer landfill cap section which includes the following components: Foundation soil layer, Sodium Bentonite Geocomposite Liner, Geosynthetic Membrane Liner, Final soil cover, and Perimeter berms and drainage swales.

  10. 76 FR 71465 - Defense Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... Government procurement. Mary Overstreet, Editor, Defense Acquisition Regulations System. Interim Rule Adopted... Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major Defense Acquisition...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the...

  11. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  12. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...

  13. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... interim measures necessary to ensure the protection of human health and the environment. Interim measures... supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may occur if remedial... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...

  14. 78 FR 38843 - Single Application Option

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... Application Option AGENCY: U.S. Copyright Office, Library of Congress. ACTION: Interim final rule. SUMMARY: The U.S. Copyright Office is amending its regulations on an interim basis in order to establish a new... an additional option for individual authors/claimants registering a single (one) work that is not a...

  15. 76 FR 52547 - Importation of Horses From Contagious Equine Metritis-Affected Countries

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 9 CFR Part 93 [Docket No... AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Interim rule; delay of enforcement and... additional time to comment on the interim rule and provide the Animal and Plant Health Inspection Service...

  16. 78 FR 24331 - Apricots Grown in Designated Counties in Washington; Temporary Suspension of Handling Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Docket No. AMS-FV-12-0028... Regulations AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule... the marketing order for apricots grown in designated Counties in Washington. The interim rule...

  17. 75 FR 45678 - Notice of Availability of Interim Staff Guidance Document for Fuel Cycle Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... Document for Fuel Cycle Facilities AGENCY: Nuclear Regulatory Commission. ACTION: Notice of availability..., Division of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards, U.S... Commission (NRC) prepares and issues Interim Staff Guidance (ISG) documents for fuel cycle facilities. These...

  18. 75 FR 63655 - Countermeasures Injury Compensation Program (CICP): Administrative Implementation, Interim Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Administration (HRSA), HHS. ACTION: Interim final rule with request for comments. SUMMARY: The Public Readiness and Emergency Preparedness Act (PREP Act) authorizes the Secretary of Health and Human Services (the Secretary) to establish the Countermeasures Injury Compensation Program (CICP or Program). The Department of...

  19. 78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision... medical events occurring under an NRC licensee's permanent implant brachytherapy program. This interim..., ``Adequacy of Medical Event Definitions in 10 CFR [Title 10 of the Code of Federal Regulations] 35.3045, and...

  20. 76 FR 78465 - Home Mortgage Disclosure (Regulation C)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... 44 U.S.C. 1510. #0; #0;The Code of Federal Regulations is sold by the Superintendent of Documents. #0... Mortgage Disclosure (Regulation C) AGENCY: Bureau of Consumer Financial Protection. ACTION: Interim final... a new Regulation C (Home Mortgage Disclosure). This interim final rule does not impose any new...

  1. 16 CFR 1209.37 - Corrective actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.37 Corrective actions. (a) Test failure... insulation product itself. Corrective action may consist of equipment adjustment, equipment repair, equipment...

  2. 78 FR 22257 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OAR-2007-0268; FRL-9707-2] Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of document availability for interim use and public...

  3. Remedial Investigation/Feasibility Study/Interim Response Actions

    DTIC Science & Technology

    1988-03-25

    organosulfur compounds (CC/FP), organophosphorus compounds (CC/FPD), hydrocarbons (CC/FID), volatile aromatic compounds (GC/ PID ), volatile halogenated...ICP metals, mercury and arsenic (AA). Water samples are being analyzed for volatile halogenated organics (GC/CON), volatile aromatic organics (GC/ PID ...Feb Mar Apr May Jun Jul Aug SepSI - I I I I I • .. I I I ----+----- 685 27-90 so ONSITE DISPOSAL FACILITY .i * 686 27-01 Prep FLUE Plan Fz=m8u> 6e7

  4. Preliminary Engineering Design Package for the Basin A Neck Groundwater Intercept and Treatment System Interim Response Action

    DTIC Science & Technology

    1989-02-01

    INDICATOR pPOST-FILTERED VITER RPUESIC POST-FILTRATION POLYMER SOLUTION MCUUM BREAKER FILTRATION POLYMER D*+RENTALkL PRESSURE SWITCH FEED PUMPS POLYMER...differential pressure switch signals the need for backwash of the operating filter. At this time, flow is S automatically switched to the standby filter...filter is undergoing backwash or on standby. High differential pressure across the filter bed, as sensed by a differential pressure switch , signals

  5. Offpost Interim Response Action, Alternatives Assessment, Version 2.3

    DTIC Science & Technology

    1988-12-01

    copper resulting from the use as algicides or herbicides of basic copper carbonate (molachite), copper sulfate (see below), copper monoethandime, and...mart per million for potable water for residues of -copper resulting from the use as algicides or herbicides of basic copper sulfat. and the other...Water ARAR: 21 C.F.R. § 193.90 (TPFA) -- tolerance of 1 part per million for potable water for residues of copper resulting from the use as algicides or

  6. Treatability Study in Support of Intrinsic Remediation for Site ST41. Elmendorf Air Force Base, Anchorage, Alaska

    DTIC Science & Technology

    1995-10-01

    BTEX on the shallow groundwater system at the site. Site history and the results of soil and groundwater investigations conducted previously are also...or predicted future, concentrations and distribution. Whether in conjunction with the interim 1 remedial action system already in place or not...L:\\45007\\st4 I rept\\st41 finl.doc D 0 • 0 • 0 0 0 0 • 6 FINAL 4 22 years, depending upon the effectiveness of the interim remedial action (IRA) system

  7. 75 FR 26981 - Notice of Establishment of Interim Final Supplementary Rules for Public Lands Managed by the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCACO8000 L16100000 DX0000] Notice of..., California AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Establishment of Interim Final Supplementary Rules. SUMMARY: In accordance with the Record of Decision for the Sierra Resource Management Plan...

  8. 77 FR 25910 - National Trails System Act and Railroad Rights-of-Way

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION...) for rail banking and interim trail use under the National Trails System Act (Trails Act). New rules are adopted that require the parties jointly to notify the Board when an interim trail use/rail...

  9. 75 FR 36643 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. ACTION: Notice. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an...

  10. 78 FR 52079 - Oranges, Grapefruit, Tangerines, and Tangelos Grown in Florida; Relaxing Size and Grade...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-22

    ... Requirements on Valencia and Other Late Type Oranges AGENCY: Agricultural Marketing Service, USDA. ACTION...). The interim rule reduced the minimum size for Valencia and other late type oranges shipped to... interim rule also lowered the minimum grade for Valencia and other late type oranges shipped to interstate...

  11. 77 FR 66920 - Registration of Claims to Copyright: Group Registration of Serial Issues Filed Electronically

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... LIBRARY OF CONGRESS Copyright Office 37 CFR Part 202 [Docket No. RM 2012-11] Registration of..., Library of Congress. ACTION: Interim regulations. SUMMARY: The Copyright Office is adopting interim..., applicants must still send two complimentary subscription copies of the serial promptly to the Library of...

  12. Financial responsibilities under RCRA. Hearing before the Subcommittee on Commerce, Transportation, and Tourism of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session on H. R. 3692, November 13, 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-01-01

    Representatives of environmental organizations, the Hazardous Waste Treatment Council, and regulators were among those testifying at a hearing on H.R. 3692, which amends the Resource Conservation and Recovery Act (RCRA) of 1976. The bill is in response to concerns that the Environmental Protection Agency (EPA) has not compiled with the intent of RCRA in its failure to move beyond interim permits to issue final permits to land disposal facilities accepting hazardous wastes. Reported leakage and environmental risks from sites operating under interim permits raises questions about how disposal companies could deal with liability claims. At issue was whether Congress needsmore » to take new action to develop regulations under which financially responsible companies can operate or whether new EPA rules can solve the problem. A spokesman for EPA reviewed the liability insurance problem and the status of the insurance market in this context. Material submitted for the record follows the text of H.R. 3692 and the testimony of 11 witnesses.« less

  13. Implementation Document for Other Contamination Sources Interim Response Action shell Section 36 Trenches, RMA. Volume 1. General

    DTIC Science & Technology

    1990-12-01

    rights and obligations of theA Army as L.aaa Aqency-or Shall as Leand Party under any law or the Federai. Fact..ity (g) Unless otherwise provided in a...Exposure occurs principally during manufacture or during bulk handling activities. Since it is generally injected into the soil at depths of 15 to 30 cm...Slurry Mix Design: The design of the IMPERMIX grouting mix, which shall meet all requirements of the Impermix manufacturer . G. Quality Control Testing

  14. 78 FR 78838 - Grant of Interim Extension of the Term of U.S. Patent No. 5,496,801; Recombinant Human...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... Hormone AGENCY: United States Patent and Trademark Office, Commerce. ACTION: Notice of interim patent term... No. 5,496,801. The patent claims the human biological product recombinant human parathyroid hormone... human parathyroid hormone, was filed on October 24, 2013, and is currently undergoing regulatory review...

  15. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...

  16. 77 FR 28765 - Homeless Emergency Assistance and Rapid Transition to Housing: Emergency Solutions Grants Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... program. The heading for this rule displayed a RIN number of 2506-AC29, which was incorrect. RIN number.... ACTION: Interim rule; correction. SUMMARY: The document advises that the interim rule for the Emergency Solutions Grants program, published on December 5, 2011, displayed an incorrect RIN number. This document...

  17. Maintenance action readiness assessment plan for White Oak Creek and Melton Branch Weir Stilling Pool cleanout at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is wellmore » below the US Environmental Protection Agency`s level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830.« less

  18. 49 CFR 190.235 - Civil actions generally.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Civil actions generally. 190.235 Section 190.235... PROCEDURES Enforcement Specific Relief § 190.235 Civil actions generally. Whenever it appears to the... or appropriate, including mandatory or prohibitive injunctive relief, interim equitable relief, civil...

  19. CCSS Literacy and Math Tools: An Interim Report on Implementation and Sustainability during the Pilot Year

    ERIC Educational Resources Information Center

    Reumann-Moore, Rebecca; Lawrence, Nancy; Sanders, Felicia; Shaw, Kate; Christman, Jolley Bruce

    2011-01-01

    This document summarizes the findings from the initial round of research on the development and piloting of two types of instructional tools designed to support teachers' integration of the Common Core State Standards (CCSS) in literacy and math. In this interim report, Research for Action (RFA) presents key findings from the first half of the…

  20. Considerations Taken in Developing the Frequency Assignment Guidelines for Communications in the Mars Region Provided in SFCG Recommendation 22-1, (SFCG Action Item No. 23/10)

    NASA Technical Reports Server (NTRS)

    Wang, Charles C.; Peng, Ted; Sue, Miles K.

    2004-01-01

    In the 23'd Annual SFCG meeting in San Diego, CA, the SFCG created SFCG Action Item No. 23/10 to provide a readable summary of the work done by the Mars Interim Working Group (MIWG). The SFCG created the MIWG to develop a frequency plan for future Mars missions. The working group has produced a number of documents resulting in a recommendation, SFCG Rec 22-1 [1], titled Frequency Assignment Guidelines for Communications in Mars Region, including a frequency plan for the Mars Region. This document is prepared in response to the SFCG Action Item to provide an overview of the considerations taken when selecting the frequencies and to point out where detailed information of the considerations can be found.

  1. Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action

    DTIC Science & Technology

    1991-09-30

    4. TITLE AND SUBTITLE 5 . FUNDING NUMBERS Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action 6. AUTHOR(S) Sam Capps Rupe, Major -1...Interim Status for TSD Facilities .................... 19 5 . Closure and Postclosure Requirements for TSD Facilities ........... 25 D. State Role... 65 1. RCRA Facility Assessment . ............................... 65 2. RCRA Facility Investigation . .............................. 66 3

  2. Rural applications of advanced traveler information systems : recommended actions

    DOT National Transportation Integrated Search

    1997-07-01

    The Recommended Action Plan is one in a series of interim documents for the Rural Applications of Advanced Traveler Information Systems (ATIS) project. Based on the investigation of user needs, a technology review, and concept development and assessm...

  3. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri. [Hazelwood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  4. Final Decision Document for the Basin a Neck Groundwater Intercept and Treatment System Interim Response Action at the Rocky Mountain Arsenal.

    DTIC Science & Technology

    1989-02-01

    PLAN A Health and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan...Bicycloheptadiene BCHPD 0(2) Bromoform CHBR3 100(4) note: total trihalomethanes Cadmium CD 10(1) 5(3)* 10(4) I Carbon tetrachloride CCL4 0(3) 5(4) Chlordane CLDAN...comments, numerous carcinogenicity tests in a variety of animals indicate that aldrin and dieldrin promote only liver tumors and the tumors develop only

  5. Draft Final Decision Document for the North Boundary System Improvements Interim Response Action at the Rocky Mountain Arsenal

    DTIC Science & Technology

    1989-04-01

    and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan addresses...totaltriThelomethanes radmiutm CD 10(1) 5 .13)* 10(4 Larbon tetrachloride CCL4 0(3)5.4 ’tordane CDN0.004(l) 0.00046(5) CLI3oride CL 250,000(l...numerous carcinogenicity tests in a variety of animals indicate that dieldrin promotes only liver tumors and the tumors develop only in mice. On the basis of

  6. 78 FR 59163 - Rules of Practice for Issuance of Temporary Cease-and-Desist Orders

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... any violation or practice specified in the notice of charges and to take affirmative action to prevent... the incomplete or inaccurate state of the books or records; or (2) Affirmative action to restore such... Financial Protection. ACTION: Interim final rule with request for public comment. SUMMARY: The Dodd-Frank...

  7. Superfund record of decision (EPA Region 10): Elmendorf Air Force Base, Operable Unit 2, source area ST41, Anchorage, AK. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    The 13,130-acre Elmendorf Air Force Base (AFB) site is located adjacent to the municipality of Anchorage, Alaska. From 1940 to 1991, Elmendorf AFB used a 20-acre portion of the site, referred to as source area ST41, to store the fuel product JP-4 and aviation gasoline in four 1-million gallon underground tanks. As a result of numerous leaks and above-ground spills since the tanks were installed in the 1940s, USAF conducted investigations through its Installation Restoration Program (IRP). These investigations revealed several hundred thousand gallons of fuel in the ground water and soil. The ROD addresses an interim remedy at Elmendorfmore » AFB. The action is needed to reduce further spread of fuel constituents through the recovery of floating product on the ground water surface, and containment of seeps. Future RODs will include a final remedy for ground water and soil at ST41, as OU2, and will address the other six OUs at the site. The primary contaminants of concern affecting the ground water at ST41 are the compounds in JP-4, especially VOCs such as benzene, toluene, and xylenes. The selected interim remedial action for the site are included.« less

  8. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  9. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section, when— (1) The company's valid Document of Compliance certificate or Interim Document of Compliance certificate applies to that vessel type; (2) The company's safety management system for the vessel... to the responsible person or their company. (b) An Interim Safety Management Certificate is valid for...

  10. 10 CFR 1021.211 - Interim actions: Limitations on actions during the NEPA process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... during the NEPA process. While DOE is preparing an EIS that is required under § 1021.300(a) of this part, DOE shall take no action concerning the proposal that is the subject of the EIS before issuing an ROD... which an EIS is being prepared shall not be categorically excluded under subpart D of these regulations...

  11. Revised Interim Final Consolidated Enforcement Response and Penalty Policy for the Pre-Renovation Education Rule; Renovation, Repair and Painting Rule; and Lead-Based Paint Activities Rule

    EPA Pesticide Factsheets

    This is the revised version of the Interim Final Consolidated Enforcement Response and Penalty Policy for the Pre-Renovation Education Rule; Renovation, Repair and Painting Rule; and Lead-Based Paint Activities Rule.

  12. Exceptions or alternatives to labeling requirements for products held by the Strategic National Stockpile. Final rule.

    PubMed

    2012-02-06

    The Food and Drug Administration (FDA) is adopting as a final rule, without change, the interim final rule that issued regulations permitting FDA Center Directors to grant exceptions or alternatives to certain regulatory labeling requirements applicable to human drugs, biological products, or medical devices that are or will be included in the Strategic National Stockpile (SNS). FDA is taking this action to complete the rulemaking initiated with the interim final rule.

  13. 76 FR 8366 - Science Advisory Board Staff Office; Request for Nominations; SAB Environmental Justice Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... Nominations; SAB Environmental Justice Technical Panel AGENCY: Environmental Protection Agency (EPA). ACTION... experts to serve on the SAB Environmental Justice Technical (EJT) Panel. DATES: Nominations should be...) released the Interim Guidance on Considering Environmental Justice During the Development of an Action...

  14. Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs

    2011-02-01

    Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) frommore » unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.« less

  15. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. OVERVIEW AND APPLICATION. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  16. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 4: ANALYTICAL GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  17. Interim heterogeneity changes measured using entropy texture features on T2-weighted MRI at 3.0 T are associated with pathological response to neoadjuvant chemotherapy in primary breast cancer.

    PubMed

    Henderson, Shelley; Purdie, Colin; Michie, Caroline; Evans, Andrew; Lerski, Richard; Johnston, Marilyn; Vinnicombe, Sarah; Thompson, Alastair M

    2017-11-01

    To investigate whether interim changes in hetereogeneity (measured using entropy features) on MRI were associated with pathological residual cancer burden (RCB) at final surgery in patients receiving neoadjuvant chemotherapy (NAC) for primary breast cancer. This was a retrospective study of 88 consenting women (age: 30-79 years). Scanning was performed on a 3.0 T MRI scanner prior to NAC (baseline) and after 2-3 cycles of treatment (interim). Entropy was derived from the grey-level co-occurrence matrix, on slice-matched baseline/interim T2-weighted images. Response, assessed using RCB score on surgically resected specimens, was compared statistically with entropy/heterogeneity changes and ROC analysis performed. Association of pCR within each tumour immunophenotype was evaluated. Mean entropy percent differences between examinations, by response category, were: pCR: 32.8%, RCB-I: 10.5%, RCB-II: 9.7% and RCB-III: 3.0%. Association of ultimate pCR with coarse entropy changes between baseline/interim MRI across all lesions yielded 85.2% accuracy (area under ROC curve: 0.845). Excellent sensitivity/specificity was obtained for pCR prediction within each immunophenotype: ER+: 100%/100%; HER2+: 83.3%/95.7%, TNBC: 87.5%/80.0%. Lesion T2 heterogeneity changes are associated with response to NAC using RCB scores, particularly for pCR, and can be useful across all immunophenotypes with good diagnostic accuracy. • Texture analysis provides a means of measuring lesion heterogeneity on MRI images. • Heterogeneity changes between baseline/interim MRI can be linked with ultimate pathological response. • Heterogeneity changes give good diagnostic accuracy of pCR response across all immunophenotypes. • Percentage reduction in heterogeneity is associated with pCR with good accuracy and NPV.

  18. Superfund record of decision (EPA Region 5): Skinner Landfill, Butler County, Union Township, West Chester, OH. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-30

    The 78-acre Skinner Landfill site is located in West Chester, Butler County, Ohio. Land use in the immediate vicinity includes business and residential uses to the west and crop farming to the north. The site was used in the past for the mining of sand and gravel, and was operated for the landfilling of a wide variety of materials from approximately 1934 through 1990. Materials deposited onsite include demolition debris, household refuse, and a wide variety of chemical wastes. In 1982, EPA conducted an investigation that showed that the groundwater southeast of the buried waste lagoon was contaminated with VOCs.more » RI studies conducted between 1986 and 1989 investigated the site ground water, surface water, soil, and sediment. In 1990, the state closed the site to further landfilling activities. The ROD is an interim action to protect human health by limiting site access to prevent ingestion of and direct contact with contaminated soil, and to protect the potentially affected users of ground water on and near the site. The primary contaminants of concern affecting the soil and ground water are VOCs, including benzene; organics, including PAHs, PCBs, and pesticides; and metals, including arsenic. The selected interim remedial action for the site are included.« less

  19. 76 FR 45174 - State Official Notification Rules

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... granted in section 1042(a) to enforce the Act or regulations prescribed thereunder. This interim final... actions or proceedings undertaken under section 1042(a) of the Act, 12 U.S.C. 5552(a), to enforce the Act... than 10 days prior to initiating an action to enforce the Act or any regulation prescribed thereunder...

  20. "Winsight"™ Assessment System: Preliminary Theory of Action. Research Report. ETS RR-17-26

    ERIC Educational Resources Information Center

    Wylie, E. Caroline

    2017-01-01

    The "Winsight"™Assessment System integrates summative, interim (including both benchmark assessments and testlets), and formative assessment components initially focused on mathematics and English language arts (ELA) in Grades 3-8 and high school.This report provides a preliminary theory of action for the Winsight Assessment System. A…

  1. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  2. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS, MODULE 3: SITE CHARACTERIZATION AND SAMPLING GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  3. Superfund record of decision (EPA Region 7): Cornhusker Army Ammunition Plant, Operable Unit 1, Hall County, Grand Island, NE, September 29, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    The decision document presents the selected interim remedial action for the groundwater operable unit at the Cornhusker Army Ammunition Plant (CAAP). Operable Unit One encompasses the explosives groundwater plume(s), both on-post and off-post. Explosives of concern in the contaminant plume include RDX, TNT, HMX, and their decomposition products. The objective of the interim action is to contain the plume and prevent further migration of contaminants, and does not encompass full restoration of the plume of contaminated groundwater. The recommended alternatives provide an approach to containing and removing contaminant mass from the groundwater plume. This approach will control further migration ofmore » the plume and reduce the levels of the contamination in groundwater.« less

  4. The Predictive Validity of Interim Assessment Scores Based on the Full-Information Bifactor Model for the Prediction of End-of-Grade Test Performance

    ERIC Educational Resources Information Center

    Immekus, Jason C.; Atitya, Ben

    2016-01-01

    Interim tests are a central component of district-wide assessment systems, yet their technical quality to guide decisions (e.g., instructional) has been repeatedly questioned. In response, the study purpose was to investigate the validity of a series of English Language Arts (ELA) interim assessments in terms of dimensionality and prediction of…

  5. MATS E-Reporting Final Action

    EPA Pesticide Factsheets

    This page describes the interim final rule that will allow owners or operators of electric generating units to submit to EPA electronic emissions and compliance reports for the Mercury and Air Toxics rule.

  6. Proposed Amendment to the Final Decision Document for the Hydrazine Blending and Storage Facility, Interim Response Action

    DTIC Science & Technology

    1991-02-25

    OerAtlonl n eor$. 12.15 eflerne tHI IRE III N~ l~l 1111 111111 [10 liii 0I tr. oOffýe of Ni’a eerTe~ n.’ gmo e !oe. ojporcrm. q.,ucto, 9,r7ect f0704-0...Sewage Treatment Plant (STP) of hydrazine wastewater treated to 5 pg/l of NDMA. AEHA’s findings were published in a study released to PMRMA on October 22...the disposal alternative, the EPA would not issue a National Pollutant Discharge Elimination System (NPDES) permit to allow disposal of the treated

  7. The role of interim 18F-FDG PET/CT in prediction of response to ipilimumab treatment in metastatic melanoma.

    PubMed

    Sachpekidis, Christos; Anwar, Hoda; Winkler, Julia; Kopp-Schneider, Annette; Larribere, Lionel; Haberkorn, Uwe; Hassel, Jessica C; Dimitrakopoulou-Strauss, Antonia

    2018-07-01

    The aim of the present study was to assess the value of interim 18 F-FDG PET/CT performed after the first two cycles of ipilimumab treatment in the prediction of the final clinical response to this type of immunotherapy. The study group comprised 41 patients with unresectable metastatic melanoma scheduled for ipilimumab therapy. Whole-body 18 F-FDG PET/CT was performed before the start of ipilimumab treatment (baseline PET/CT) and after the initial two cycles of ipilimumab treatment (interim PET/CT). Evaluation of patient response to treatment was based on the European Organization for Research and Treatment of Cancer (EORTC) 1999 criteria for PET as well as the recently proposed PET Response Evaluation Criteria for Immunotherapy (PERCIMT). The patients' best clinical response, assessed at a median of 21.4 months (range 6.3-41.9 months) was used as reference. According to their best clinical response, the patients were divided into two groups: those showing clinical benefit (CB) including stable disease, partial response and complete response (31 patients), and those showing no clinical benefit (no-CB including progressive disease (10 patients). According to the EORTC criteria, interim PET/CT demonstrated progressive metabolic disease (PMD) in 20 patients, stable metabolic disease (SMD) in 11 patients, partial metabolic response (PMR) in 8 patients, and complete metabolic response (CMR) in 2 patients. According to the PERCIMT, interim PET/CT demonstrated PMD in 9 patients, SMD in 24 patients, PMR in 6 patients and CMR in 2 patients. On the basis of the interim PET, the patients were divided in a similar manner to the division according to clinical response into those showing metabolic benefit (MB) including SMD, PMR and CMR, and those showing no metabolic benefit (no-MB) including PMD. According to this dichotomization, the EORTC criteria showed a sensitivity (correctly predicting CB) of 64.5%, a specificity (correctly predicting no-CB) of 90.0%, a positive predictive value (PPV) of 95.2%, a negative predictive value (NPV) of 45.0% and an accuracy of 70.7% in predicting best clinical response. The PERCIMT showed a sensitivity of 93.6%, a specificity of 70.0%, a PPV of 90.6%, a NPV of 77.8% and an accuracy of 87.8%. The McNemar test showed that the PERCIMT had a significantly higher sensitivity than EORTC criteria (p = 0.004), while there was no significant difference in specificity (p = 0.5). The agreement between the two sets of criteria was poor (McNemar test p = 0.001, and accordingly kappa = 0.46). The application of the recently proposed PERCIMT to interim 18 F-FDG PET/CT provides a more sensitive predictor of final clinical response to immunotherapy than the application of the EORTC criteria in patients with metastatic melanoma.

  8. Individual Pesticides in Registration Review

    EPA Pesticide Factsheets

    You can used the Chemical Search database to search pesticides by chemical name and find their registration review dockets, along with Work Plans, risk assessments, interim and final decisions, tolerance rules, and cancellation actions.

  9. There Is an Alternative: A Report on an Action Research Project to Develop a Framework for Co-Operative Higher Education

    ERIC Educational Resources Information Center

    Neary, Mike; Winn, Joss

    2017-01-01

    This report provides an interim account of a participatory action research project undertaken during 2015-16. The research brought together scholars, students and expert members of the co-operative movement to design a theoretically informed and practically grounded framework for co-operative higher education that activists, educators and the…

  10. Response Of Iowa pavements to a tracked agricultural vehicle

    DOT National Transportation Integrated Search

    2000-12-01

    The overall objective of the work summarized in this report and in the interim report was to study the effects of targeted implement-of-husbandry loads. This report is to complement Phase I of this work, which was summarized in the interim report, "R...

  11. Superfund Record of Decision (EPA Region 4): USMC Camp Lejeune Military Reservation, NC. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-23

    The 500-acre Camp Lejeune Military Reservation is located 15 miles southeast of Jacksonville, in Onslow County, North Carolina. Within the site lies the Hadnot Point Industrial Area (HPIA), which was constructed in the late 1930's. It is composed of 75 buildings and facilities, which include gas stations, offices, storage yards, maintenance shops, and a dry cleaning plant. Several areas of the HPIA have been investigated for potential contamination attributed to Marine Corps activities and operations that resulted in a generation of potentially hazardous wastes. The ROD addresses an interim remedial action for the shallow aquifer at the HPIA to protectmore » human health from exposure to VOCs and metals. The primary contaminants of concern affecting the shallow ground water aquifer are VOCs, including benzene and TCE; and metals, including arsenic, chromium, and lead.« less

  12. Superfund record of decision (EPA Region 3): US Defense General Supply Center, Operable Unit 9, Chesterfield County, VA, September 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The decision document presents the selected interim remedial action for Operable Unit 9 (OU9) at the Defense General Supply Center (DGSC) in Chesterfield County, Virginia near Richmond. OU9 pertains to groundwater beneath Area 50, the Open Storage Area (OSA), and the Naitonal Guard Area (NGA). This operable unit is the third of nine operable units that are currently being addressed at the DGSC. OU9 addresses interim treatment and containment of groundwater in the upper and lower aquifers beneath Area 50, the OSA, and the NGA.

  13. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  14. A Comprehensive Evaluation of the Community Action Program in Austin and Travis County, Texas. Final Report.

    ERIC Educational Resources Information Center

    Tracor, Inc., Austin, TX.

    Produced in four parts, this report covers a study of poor people in Austin, Texas, begun in 1967. Initial research efforts defined the problem and identified the population to be studied. An interim report was then made on the first year's findings. This involved evaluating some of the community action programs (CAP) and identifying and analyzing…

  15. Final Alternatives Assessment of Interim Response Actions for Other Contamination Sources M-1 Settling Basins, Rocky Mountain Arsenal, Version 3.1

    DTIC Science & Technology

    1989-11-01

    u = W. QU- -; t2 E~ zi=- 6e-1 wo u CC .2 211 ~ .CC > . I- - . Ece Zc a- c’ cC I C! 0. - ZEC E ~C C 6-12 E 0 U- .0 E ~E 0 -6 -1 1 I- 8t~ V- .~ u osz w18...Materials and Waste Management Division Colorado Department of Health 4210 East 11th Avenue Denver, CO 80020 Victoria Peters , Esq. Office of Attorney...999 18th Street, Suite 500 Denver, CO 80202-2405 Dr. Peter Gober U.S. Fish and Wildlife Service Rocky Mountain Arsenal, Bldg. 111 Commerce City, CO

  16. 49 CFR 1152.29 - Prospective use of rights-of-way for interim trail use and rail banking.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE... Board. (b)(1) In abandonment application proceedings under 49 U.S.C. 10903, interim trail use statements... filed. See § 1152.25(c). The applicant carrier's response notifying the Board whether and with whom it...

  17. 49 CFR 1152.29 - Prospective use of rights-of-way for interim trail use and rail banking.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE... Board. (b)(1) In abandonment application proceedings under 49 U.S.C. 10903, interim trail use statements... filed. See § 1152.25(c). The applicant carrier's response notifying the Board whether and with whom it...

  18. 49 CFR 1152.29 - Prospective use of rights-of-way for interim trail use and rail banking.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE... Board. (b)(1) In abandonment application proceedings under 49 U.S.C. 10903, interim trail use statements... filed. See § 1152.25(c). The applicant carrier's response notifying the Board whether and with whom it...

  19. 78 FR 55339 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Capital Adequacy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.

  20. Engineering study of 50 miscellaneous inactive underground radioactive waste tanks located at the Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freeman-Pollard, J.R.

    1994-03-02

    This engineering study addresses 50 inactive underground radioactive waste tanks. The tanks were formerly used for the following functions associated with plutonium and uranium separations and waste management activities in the 200 East and 200 West Areas of the Hanford Site: settling solids prior to disposal of supernatant in cribs and a reverse well; neutralizing acidic process wastes prior to crib disposal; receipt and processing of single-shell tank (SST) waste for uranium recovery operations; catch tanks to collect water that intruded into diversion boxes and transfer pipeline encasements and any leakage that occurred during waste transfer operations; and waste handlingmore » and process experimentation. Most of these tanks have not been in use for many years. Several projects have, been planned and implemented since the 1970`s and through 1985 to remove waste and interim isolate or interim stabilize many of the tanks. Some tanks have been filled with grout within the past several years. Responsibility for final closure and/or remediation of these tanks is currently assigned to several programs including Tank Waste Remediation Systems (TWRS), Environmental Restoration and Remedial Action (ERRA), and Decommissioning and Resource Conservation and Recovery Act (RCRA) Closure (D&RCP). Some are under facility landlord responsibility for maintenance and surveillance (i.e. Plutonium Uranium Extraction [PUREX]). However, most of the tanks are not currently included in any active monitoring or surveillance program.« less

  1. 10 CFR 712.19 - Removal from HRP.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF ENERGY HUMAN RELIABILITY PROGRAM Establishment of and Procedures for the Human Reliability Program... immediately remove that individual from HRP duties pending a determination of the individual's reliability. A... HRP duties pending a determination of the individual's reliability is an interim, precautionary action...

  2. Final Environmental Assessment for the CV-22 Interim Beddown

    DTIC Science & Technology

    2016-04-01

    as asbestos -containing materials and lead-based paints, depending on the age of the buildings demolished. The Proposed Action and proposed...Demolition could generate additional hazardous wastes and materials such as asbestos -containing materials and lead-based paints, depending on the

  3. 75 FR 25110 - Inmate Communication With News Media: Removal of Byline Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 540 [BOP-1149] RIN 1120-AB49 Inmate Communication With News Media: Removal of Byline Regulations AGENCY: Bureau of Prisons, Justice Department. ACTION: Interim final rule; technical correction. [[Page 25111

  4. 76 FR 40777 - Interim Enforcement Policy for Certain Fire Protection Issues

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... Certain Fire Protection Issues AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision... Enforcement Policy on enforcement discretion for certain fire protection issues to extend the enforcement... policy affects licensees that are transitioning to use the National Fire Protection Association Standard...

  5. Usefulness of Interim FDG-PET After Induction Chemotherapy in Patients With Locally Advanced Squamous Cell Carcinoma of the Head and Neck Receiving Sequential Induction Chemotherapy Followed by Concurrent Chemoradiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yoon, Dok Hyun; Cho, Yoojin; Kim, Sang Yoon

    2011-09-01

    Purpose: Induction chemotherapy (ICT) has been used to select patients for organ preservation and determine subsequent treatments in patients with locally advanced squamous cell carcinoma of the head and neck (LASCCHN). Still, the clinical outcomes of LASCCHN patients who showed response to ICT are heterogeneous. We evaluated the efficacy of interim 18-fluoro-2-deoxy-glucose positron emission tomography (FDG-PET) after ICT in this specific subgroup of LASCCHN patients who achieved partial response (PR) after ICT to predict clinical outcomes after concurrent chemoradiotherapy (CCRT). Methods and Materials: Twenty-one patients with LASCCHN who showed PR to ICT by Response Evaluation Criteria In Solid Tumors beforemore » definitive CCRT were chosen in this retrospective analysis. FDG-PET was performed before and 2-4 weeks after ICT to assess the extent of disease at baseline and the metabolic response to ICT, respectively. We examined the correlation of the metabolic response by the percentage decrease of maximum standardized uptake value (SUVmax) on the primary tumor or lymph node after ICT or a specific threshold of SUVmax on interim FDG-PET with clinical outcomes including complete response (CR) rate to CCRT, progression-free survival (PFS), and overall survival (OS). Results: A SUVmax of 4.8 on interim FDG-PET could predict clinical CR after CCRT (100% vs. 20%, p = 0.001), PFS (median, not reached vs. 8.5 mo, p < 0.001), and OS (median, not reached vs. 12.0 months, p = 0.001) with a median follow-up of 20.3 months in surviving patients. A 65% decrease in SUVmax after ICT from baseline also could predict clinical CR after CCRT (100% vs. 33.3%, p = 0.003), PFS (median, not reached vs. 8.9 months, p < 0.001) and OS (median, not reached vs. 24.4 months, p = 0.001) of the patients. Conclusion: These data suggest that interim FDG-PET after ICT might be a useful determinant to predict clinical outcomes in patients with LASCCHN receiving sequential ICT followed by CCRT.« less

  6. 75 FR 9114 - Defense Federal Acquisition Regulation Supplement; Additional Requirements Applicable to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 217 Defense Federal Acquisition Regulation Supplement; Additional Requirements Applicable to Multiyear Contracts (DFARS Case 2008-D023) AGENCY: Defense Acquisition Regulations System. Department of Defense (DoD). ACTION: Interim rule...

  7. 75 FR 39414 - Federal Acquisition Regulation; FAR Case 2008-039, Reporting Executive Compensation and First...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... National Aeronautics and Space Administration (NASA). ACTION: Interim rule with request for comments... free, public, online Web site containing full disclosure of all Federal contract award information, the...

  8. 76 FR 81789 - Consumer Leasing (Regulation M); Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... BUREAU OF CONSUMER FINANCIAL PROTECTION 12 CFR Part 1013 [Docket No. CFPB-2011-0026] RIN 3170-AA06 Consumer Leasing (Regulation M); Correction AGENCY: Bureau of Consumer Financial Protection. ACTION...). The interim final rule established a new Regulation M (Consumer Leasing) in accordance with the...

  9. 76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of NUREG... Support of Nuclear Power Plants;'' NSIR/DPR-ISG-01, ``Interim Staff Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of Evacuation Time Estimate Studies...

  10. 77 FR 25630 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    .... 120316196-2195-01] RIN 0648-BB89 Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the Northeastern United States; Northeast Multispecies Fishery; Interim Action; Withdrawn AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA...

  11. 75 FR 80335 - Federal Government Participation in the Automated Clearing House

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... Participation in the Automated Clearing House AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Interim final rule. SUMMARY: The Department of the Treasury, Financial Management Service (FMS... include the agency name (``Financial Management Service'') and docket number FISCAL-FMS-2010- 0003 for...

  12. 75 FR 13680 - Commutation of Sentence: Technical Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... Sentence: Technical Change AGENCY: Bureau of Prisons, Justice. ACTION: Interim rule. SUMMARY: This document makes a minor technical change to the Bureau of Prisons (Bureau) regulations on sentence commutation to.... Commutation of Sentence: Technical Change This document makes a minor technical change to the Bureau...

  13. 76 FR 70639 - Agricultural Career and Employment Grants Program; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... DEPARTMENT OF AGRICULTURE Office of Advocacy and Outreach 7 CFR Part 2502 RIN 0503-AA49 Agricultural Career and Employment Grants Program; Correction AGENCY: Office of Advocacy and Outreach, Departmental Management, USDA. ACTION: Interim rule with request for comments; correction. SUMMARY: On November...

  14. 77 FR 66578 - Cancellation of Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of Interim Provider; Opportunity for Designation in the Indianapolis, IN Area; Correction AGENCY: Grain Inspection, Packers and Stockyards Administration, USDA. ACTION: Notice; correction. SUMMARY: The USDA, Grain Inspection, Packers and...

  15. The Evaluation of Abstinence Education Programs Funded Under Title V Section 510: Interim Report.

    ERIC Educational Resources Information Center

    Devaney, Barbara; Johnson, Amy; Maynard, Rebecca; Trenholm, Chris

    This report presents interim findings from an independent, federally funded evaluation of the abstinence education programs authorized under the Personal Responsibility and Work Opportunity Reconciliation Act (PRWORA) and defined under Title V, Section 510 (b)(2)(A-H) of the Social Security Act. The report draws heavily on 4 years of…

  16. Lessons for outsourcing and interim management relationships.

    PubMed

    Macko, W; Kostyack, P T

    1999-01-01

    Few decisions can affect an organization more than the selection of an outsourcing or interim management partner. More and more health care organizations face such decisions in today's competitive market in order to face new business needs. Making these relationships successful can be important for health care organizations seeking competitive advantages or seeking immediately accessible management support. These relationships, however, require careful partner selection and development. Success in outsourcing and interim management relationships is contingent upon a thorough selection process, a strong contract that has clearly and explicitly detailed responsibilities and a culture-sensitive business rapport between the client and selected partner.

  17. Corrective Action Glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-01

    The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations ormore » remediations are also included.« less

  18. 78 FR 79567 - Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... DEPARTMENT OF AGRICULTURE Food and Nutrition Service 7 CFR Parts 271 and 274 RIN 0584-AE26 Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations AGENCY: Food and Nutrition Service, USDA. ACTION: Final rule, Interim final rule; notice of approval of Information...

  19. 75 FR 80678 - Conversions of Insured Credit Unions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... Conversions of Insured Credit Unions AGENCY: National Credit Union Administration (NCUA). ACTION: Interim... of the phrase ``Regional Director'' in NCUA's rule on credit union to mutual savings bank conversions and to add the same revised definition of that phrase to NCUA's rule on conversions to nonfederal...

  20. 77 FR 31724 - Exchange Visitor Program-Summer Work Travel; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... DEPARTMENT OF STATE 22 CFR Part 62 RIN 1400-AD14 [Public Notice 7902] Exchange Visitor Program--Summer Work Travel; Correction AGENCY: Department of State. ACTION: Interim final rule; correction SUMMARY: This document contains minor corrections to the Exchange Visitor Program--Summer Work Travel...

  1. 77 FR 40459 - Electronic Fund Transfers (Regulation E); Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Electronic Fund Transfers (Regulation E); Correction AGENCY: Bureau of Consumer Financial Protection. ACTION... published the Final Rule (77 FR 6194), which implements the Electronic Fund Transfer Act, and the official... Sec. 1005.3(a) in the interim final rule, Electronic Fund Transfers (Regulation E), published on...

  2. Superfund Record of Decision (EPA Region 4): Milan Army Ammunition Plant, TN. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-30

    The 22,436-acre Milan Army Ammunition Plant (MAAP) is located in western Tennessee, 5 miles east of Milan, Tennessee. The facility was constructed in 1941 to produce and store fuses, boosters, and small- and large-caliber ammunition. The ROD addresses an interim remedy for the contaminated ground water beneath and immediately downgradient from the former ponds as OU1. The primary contaminants of concern affecting the ground water are VOCs, including carbon disulfide; other organics, including HMX, RDX, 2,4,6-TNT, 2,4-DNT, 2,6-DNT, 1,3-DNB, 1,3,5-trinitrobenzene, and nitrobenzene; and inorganics, including nitrate.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hartman, Mary J.; Peterson, Robert E.

    This report presents and discusses results of the fiscal year 2003 sampling event associated with aquifer tubes along the Columbia River in the northern Hanford Site. Aquifer tube data help define the extent of groundwater contamination near the river, determine vertical variations in contamination, monitor the performance of interim remedial actions near the river, and support impact studies.

  4. 78 FR 56837 - 2012 Liquid Chemical Categorization Updates

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 46 CFR Parts 30, 150, and 153 [Docket No. USCG-2013-0423] RIN 1625-AB94 2012 Liquid Chemical Categorization Updates AGENCY: Coast Guard, DHS. ACTION: Interim rule; delay of effective date. SUMMARY: The Coast Guard is delaying the effective date of this...

  5. 77 FR 19525 - National School Lunch Program: School Food Service Account Revenue Amendments Related to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-02

    ... National School Lunch Program: School Food Service Account Revenue Amendments Related to the Healthy, Hunger-Free Kids Act of 2010; Approval of Information Collection Request AGENCY: Food and Nutrition Service, USDA. ACTION: Interim final rule; approval of information collection request. SUMMARY: The Food...

  6. 75 FR 17145 - Food Additives; Bisphenol A; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-05

    ... five documents related to FDA's continuing assessment of Bisphenol A (BPA) and soliciting public...). These documents do not represent an agency opinion or position on BPA, on which an interim update was... assessment of BPA. This action will enable FDA to consider comments from the public in its assessment of BPA...

  7. THE REDUCTIVE TRANSFORMATION OF PERCHLORATE IN A FRESH WATER SEDIMENT: LABORATORY BATCH STUDIES

    EPA Science Inventory

    Perchlorate is widely used as a propellant in solid rocket fuel, and has recently been found in ground, surface, and drinking water, in many cases above the interim action level of 18 ppb. Perchlorate is recalcitrant to chemical reduction, however, studies of perchlorate in pure ...

  8. THE REDUCTIVE TRANSFORMATION OF PERCHLORATE IN A FRESH WATER SEDIMENT: LABORATORY BATCH STUDIES.

    EPA Science Inventory

    Perchlorate is widely used as a propellant in solid rocket fuel, and has recently been found in ground, surface, and drinking water, in many cases above the interim action level of 18 ppb. Perchlorate is recalcitrant to chemical reduction, however, studies of perchlorate in pure ...

  9. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Take any interim measures necessary to ensure the protection of human health and the environment... drinking water supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...

  10. 75 FR 81087 - Plum Pox Virus; Update of Quarantined Areas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    .... APHIS-2010-0089] Plum Pox Virus; Update of Quarantined Areas AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Interim rule and request for comments. SUMMARY: We are amending the plum pox virus.... SUPPLEMENTARY INFORMATION: Background The plum pox virus (PPV) is an extremely serious viral disease of plants...

  11. 77 FR 64564 - Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ...-Basis Hurricane and Hurricane Missiles AGENCY: Nuclear Regulatory Commission. ACTION: Proposed interim...-ISG-024, ``Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles....221, ``Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants.'' DATES: Submit...

  12. 76 FR 21615 - Nectarines and Peaches Grown in California; Suspension of Handling Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... requirements. The orders also authorize production research and marketing research and development projects, as... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Parts 916 and 917 [Doc. No. AMS-FV... Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments...

  13. 78 FR 26504 - Women-Owned Small Business Federal Contract Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 127 RIN 3245-AG55 Women-Owned Small Business Federal Contract Program AGENCY: U.S. Small Business Administration. ACTION: Interim final rule. SUMMARY: The U.S. Small Business Administration (SBA) is amending its regulations to implement Section 1697 of the...

  14. 75 FR 48873 - Acquisition Regulation Rewrite

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... Acquisition Regulation (DIAR). This action revises the DIAR, 48 CFR chapter 14, but does not impose any new..., 2010. No public comments were received. DOI has concluded that the interim rule should be adopted as a... DEPARTMENT OF THE INTERIOR Office of the Secretary 48 CFR Chapter 14 RIN 1093-AA11 Acquisition...

  15. 76 FR 53813 - Dried Prunes Produced in California; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-30

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 993 [Doc. No. AMS-FV-11-0068... Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule decreases the assessment rate established for the Prune Marketing Committee (Committee) for the 2011-12 and subsequent crop...

  16. 76 FR 30184 - Outer Continental Shelf (OCS) Renewable Energy Program Interim Policy Leasing for Marine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management, Regulation and Enforcement [Docket..., Regulation and Enforcement (BOEMRE), Interior. ACTION: Notice of Intent (NOI) to Prepare an Environmental... technology testing facility located on the OCS, in accordance with the Department of the Interior and the...

  17. 77 FR 72683 - Sweet Cherries Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... marketing order now in effect, Washington sweet cherry handlers are subject to assessments. Funds to... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 923 [Doc. No. AMS-FV-12-0026... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY...

  18. 76 FR 16531 - Country of Origin of Textile and Apparel Products; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... RIN 1505-AB60) Country of Origin of Textile and Apparel Products; Correction AGENCIES: U.S. Customs and Border Protection, Department of Homeland Security; Department of the Treasury. ACTION: Final rule..., a document which adopted as a final rule, with some changes, interim amendments to the CBP...

  19. 76 FR 67376 - Anglers for Christ Ministries, Inc., New Beginning Ministries; Petitioners; Interpretation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 79 [CG Docket No. 06-181; FCC 11-159] Anglers for... Standard AGENCY: Federal Communications Commission. ACTION: Interim rule. SUMMARY: In this document, the... intended by the Communications Act (Act). DATES: Effective November 1, 2011. FOR FURTHER INFORMATION...

  20. 75 FR 39632 - Regulated Navigation Area; Gulf Intracoastal Waterway, Inner Harbor Navigation Canal, Harvey...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ..., Algiers Canal, New Orleans, LA; Correction ACTION: Interim rule; Correction. SUMMARY: In the Federal... Area; Gulf Intracoastal Waterway, Inner Harbor Navigation Canal, Harvey Canal, Algiers Canal, New Orleans, LA into the Code of Federal Regulations. That publication contained an error in the DATES section...

  1. 78 FR 21520 - Sweet Cherries Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 923 [Doc. No. AMS-FV-12-0026... AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY... decreased the assessment rate established for the Washington Cherry Marketing Committee (Committee) for the...

  2. 78 FR 21518 - Apricots Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Doc. No. AMS-FV-12-0027...: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY: The... the assessment rate established for the Washington Apricot Marketing Committee (Committee) for the...

  3. 78 FR 24333 - Cranberries Grown in States of Massachusetts, Rhode Island, Connecticut, New Jersey, Wisconsin...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... York, hereinafter referred to as the ``order.'' The order is effective under the Agricultural Marketing... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 929 [Doc. No. AMS-FV-12-0002... Reporting Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as...

  4. 77 FR 39150 - Avocados Grown in South Florida; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... viewed at: www.ams.usda.gov/MarketingOrdersSmallBusinessGuide . Any questions about the compliance guide... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 915 [Doc. No. AMS-FV-11-0094... Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule decreases the...

  5. 75 FR 65439 - Defense Federal Acquisition Regulation Supplement; Electronic Subcontracting Reporting System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 219 and 252 [DFARS Case... System AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Interim rule... Supplement (DFARS) to conform to the Federal Acquisition Regulation (FAR) by providing Department of Defense...

  6. 76 FR 33184 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... multiple OPs from 2001-2005. Furthermore, the USDA Food Safety and Inspection Service (FSIS) monitors meat... Food, Drug, and Cosmetic Act (FFDCA). DATES: Comments, identified by docket identification (ID) number...? You may be potentially affected by this action if you are an agricultural producer, food manufacturer...

  7. 77 FR 52595 - Cranberries Grown in States of Massachusetts, Rhode Island, Connecticut, New Jersey, Wisconsin...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 929 [Doc. No. AMS-FV-12-0002... Reporting Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule revises the reporting requirements currently prescribed under the marketing...

  8. 75 FR 39859 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 10-88] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... a summary of the Commission's Structure and Practices of the Video Relay Service Program, Order...

  9. 76 FR 47476 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... summary of the Commission's Structure and Practices of the Video Relay Service Program, Order (Order...

  10. 77 FR 33662 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Correcting amendments. SUMMARY: This document contains a correction to the interim regulations of the Commission's rules...

  11. 78 FR 68101 - Environmental Issues Associated With New Reactors and Specific Environmental Guidance for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... October 15, 2013. The Nuclear Energy Institute (NEI) submitted a letter on September 17, 2013 (Agencywide... NUCLEAR REGULATORY COMMISSION [NRC-2013-0212: NRC-2013-0211] Environmental Issues Associated With... AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; re-opening of comment period...

  12. 76 FR 69146 - Agricultural Career and Employment Grants Program; Withdrawal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ..., Departmental Management, USDA. ACTION: Proposed rule; withdrawal. SUMMARY: On October 27, 2011, USDA submitted... Regulations section of this issue of the Federal Register, USDA is publishing the interim rule. DATES: As of..., Voice: (202) 205-4215, Fax: (202) 720-7136, Email: [email protected]usda.gov . SUPPLEMENTARY...

  13. 78 FR 62963 - Apricots Grown in Designated Counties in Washington; Suspension of Handling Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Doc. No. AMS-FV-13-0040... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY... under the Washington apricot marketing order (order) for the remainder of the 2013-2014 fiscal period...

  14. 75 FR 75884 - Regulations Regarding Income-Related Monthly Adjustment Amounts to Medicare Beneficiaries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... premiums. This new subpart implements changes made to the Social Security Act (Act) by the Affordable Care... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 418 [Docket No. SSA-2010-0029] RIN 0960-AH22... Coverage Premiums AGENCY: Social Security Administration. ACTION: Interim final rule with request for...

  15. 76 FR 80733 - Extension of Temporary Registration of Municipal Advisors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... SECURITIES AND EXCHANGE COMMISSION 17 CFR Part 240 [Release No. 34-66020; File No. S7-19-10] RIN 3235-AK69 Extension of Temporary Registration of Municipal Advisors AGENCY: Securities and Exchange Commission. ACTION: Interim final temporary rule; extension. SUMMARY: The Securities and Exchange Commission...

  16. 76 FR 56949 - Biomass Crop Assistance Program; Corrections

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    .... ACTION: Interim rule; correction. SUMMARY: The Commodity Credit Corporation (CCC) is amending the Biomass... funds in favor of the ``project area'' portion of BCAP. CCC is also correcting errors in the regulation... INFORMATION: Background CCC published a final rule on October 27, 2010 (75 FR 66202-66243) implementing BCAP...

  17. Different predictive values of interim 18F-FDG PET/CT in germinal center like and non-germinal center like diffuse large B-cell lymphoma.

    PubMed

    Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung

    2017-01-01

    Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.

  18. DOUBLE TRACKS Test Site interim corrective action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarilymore » of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.« less

  19. Interim Closure Activities at Corrective Action Unit 114: Area 25 EMAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehlecke, R. F.

    This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, andmore » verified free of contents.« less

  20. Nondiscrimination on the basis of handicap--Office of the Secretary, HHS. Interim final rule.

    PubMed

    1983-03-07

    The interim final rule modifies existing regulations to meet the exigent needs that can arise when a handicapped infant is discriminatorily denied food or other medical care. Three current regulatory provisions are modified to allow timely reporting of violations, expeditious investigation, and immediate enforcement action when necessary to protect a handicapped infant whose life is endangered by discrimination in a program or activity receiving federal financial assistance. Recipients that provide health care to infants will be required to post a conspicuous notice in locations that provide such care. The notice will describe the protections under federal law against discrimination toward the handicapped, and will provide a contact point in the Department of HHS for reporting violations immediately by telephone.

  1. 77 FR 24381 - Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/Departure, Kaunakakai Harbor, Molokai, HI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2011-1159] RIN 1625-AA87 Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/ Departure, Kaunakakai Harbor, Molokai, HI AGENCY: Coast Guard, DHS. ACTION: Temporary interim rule; reopening of comment period. SUMMARY: The Coast...

  2. 77 FR 2019 - Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/Departure, Kaunakakai Harbor, Molokai, HI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2011-1159] RIN 1625-AA87 Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/ Departure, Kaunakakai Harbor, Molokai, HI AGENCY: Coast Guard, DHS. ACTION: Temporary interim rule with request for comments. SUMMARY: The Coast...

  3. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  4. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  5. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  6. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  7. 76 FR 63151 - Small Business Jobs Act: 504 Loan Program Debt Refinancing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 120 RIN 3245-AG17 Small Business Jobs Act: 504 Loan Program Debt Refinancing AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: This rule finalizes the interim final rule that implemented section 1122 of the Small Business Jobs Act of...

  8. 76 FR 8992 - National Trails System Act and Railroad Rights-of-Way

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION... procedures regarding the use of railroad rights-of-way for railbanking and interim trail use under the National Trails System Act (Trails Act). DATES: Comments are due by April 12, 2011; replies are due by May...

  9. 77 FR 2446 - Amendments to Regulations Regarding Eligibility for a Medicare Prescription Drug Subsidy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... Administration. ACTION: Final rule. SUMMARY: This final rule adopts, without change, the interim final rule with... incorporated changes to the Medicare prescription drug coverage low-income subsidy (Extra Help) program made by..., 2011. We also revised our regulations to incorporate changes made by the Medicare Improvements for...

  10. 78 FR 10554 - Interim Final Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality Management District AGENCY... on a proposed approval of a revision to the Sacramento Metropolitan Air Quality Management District... therefore is not subject to review by the Office of Management and Budget. This action is not subject to...

  11. 77 FR 1862 - Mailing of Tickets Under the Ticket to Work Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... Tickets Under the Ticket to Work Program AGENCY: Social Security Administration. ACTION: Interim final... Ticket to Work (Ticket) to disabled beneficiaries for participation in the Ticket to Work program (Ticket... beneficiaries who are most likely to return to work. We will send a Ticket to any eligible disabled beneficiary...

  12. Superfund explanation of significant difference for the record of decision (EPA Region 9): San Fernando Valley, Burbank Operable Unit, Los Angeles County, CA, November 21, 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1995-01-01

    The decision document presents this Explanation of Significant Differences (ESD) to the interim remedial action selected in the San Fernando Valley, Burbank Operable Unit Record of Decision (ROD) signed June 1989 (PB90-114844).

  13. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  14. 76 FR 27848 - Pears Grown in Oregon and Washington; Amendment To Allow Additional Exemptions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-10-0072...: Agricultural Marketing Service, USDA. ACTION: Adoption of interim rule as final. SUMMARY: The Department of... marketing order for Oregon-Washington pears that provides for the sale of fresh pears directly to consumers...

  15. 76 FR 4202 - Pears Grown in Oregon and Washington; Amendment To Allow Additional Exemptions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-10-0072...: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule adds an exemption to the marketing order for Oregon- Washington pears that provides for the sale of fresh...

  16. 76 FR 78150 - Procedures for the Handling of Retaliation Complaints Under Section 806 of the Sarbanes-Oxley Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... of the Sarbanes-Oxley Act of 2002, as Amended; Correction AGENCY: Occupational Safety and Health Administration, Labor. ACTION: Interim final rule; correction. SUMMARY: The Occupational Safety and Health... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1980 [Docket Number...

  17. From the Bottom Up: Toward a Strategy for Income and Employment Generation among the Disadvantaged. An Interim Report.

    ERIC Educational Resources Information Center

    O'Regan, Fred; Conway, Maureen

    The Aspen Institute's ongoing action-research program, Local Employment Approaches for the Disadvantaged (LEAD), assessed 60 programs nationally. Local initiatives fell into four general categories, with numerous subcategories: self-employment, job training and placement, job creation and retention, and community-based finance. A second breakdown…

  18. 76 FR 60707 - Supplemental Standards for Ethical Conduct for Employees of the Department of the Treasury

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... DEPARTMENT OF THE TREASURY Office of Financial Research 12 CFR Chapter XVI RIN 1505-AC38... Financial Research, Treasury. ACTION: Interim rule. SUMMARY: The Department of the Treasury (Department... chapter in Title 12 of the Code of Federal Regulations to incorporate certain post-employment prohibitions...

  19. 76 FR 67361 - Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... DEPARTMENT OF STATE 22 CFR Part 42 [Public Notice 7391] RIN 1400-AC86 Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended AGENCY: State Department. ACTION: Interim final rule. SUMMARY: This rule amends the Department of State's regulations relating to adoptions in...

  20. 78 FR 24669 - Reorganization of Regulations on the Adjudication of Department of Homeland Security Practitioner...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... DEPARTMENT OF JUSTICE Executive Office for Immigration Review 8 CFR Parts 1003 and 1292 [EOIR... Immigration Review, Department of Justice. ACTION: Final rule. SUMMARY: This final rule adopts without change... interim rule amended regulations of the Executive Office for Immigration Review (EOIR) at the Department...

  1. 78 FR 21521 - Pears Grown in Oregon and Washington; Assessment Rate Decrease for Processed Pears

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-12-0031... AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY... Committee locally administers the marketing order that regulates the handling of processed pears grown in...

  2. Improving Student Achievement in a Multidisciplinary Context

    ERIC Educational Resources Information Center

    Chapman, Amanda; Bloxham, Sue

    2004-01-01

    This article analyses interim findings of an ongoing action research project into the use of assessment criteria and grade descriptors in the assessment process. The project is multidisciplinary and covers areas as diverse as Sports Sociology, Economics, Youth and Community Studies, and Education. The idea is to equip first-year students with the…

  3. 78 FR 56816 - Vidalia Onions Grown in Georgia; Change in Reporting and Assessment Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... the following Web site: http://www.ams.usda.gov/MarketingOrdersSmallBusinessGuide ; or by contacting... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 955 [Doc. No. AMS-FV-12-0071...: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY: The...

  4. 78 FR 24983 - Domestic Dates Produced or Packed in Riverside County, California; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ...://www.ams.usda.gov/MarketingOrdersSmallBusinessGuide ; or by contacting Jeffrey Smutny, Marketing Order... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 987 [Docket No. AMS-FV-12-0035... Rate AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule...

  5. The Costs and Benefits of High Speed Vessels Relative to Traditional C-17 Military Airlift

    DTIC Science & Technology

    2003-12-01

    37 APPENDIX D SWOT Analysis...Port Action Officers Group IBCT Interim Brigade Combat Team LCS Littoral Combat Ship LST Landing ship tank LSV Logistics Support Vessel... SWOT Strength Weakness Opportunity Threat TACOM Tank and Automotive Command TSV Theater Support Vessel USS United States Ship USTRANSCOM

  6. 77 FR 20536 - Exemptions for Security-Based Swaps Issued by Certain Clearing Agencies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-05

    ... Markets Trends, Division of Corporation Finance, at (202) 551-3860, U.S. Securities and Exchange... exchange trading due to individual business needs of certain users. Those users should retain the ability... Corporation Finance issued a no-action letter that addressed the availability of these interim exemptions to...

  7. 76 FR 68116 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... with the Commission's Structure and Practices of the Video Relay Service Program, Second Report and... announcement of the effective date of the rules. See, In the Matter of Structure and Practices of the Video...

  8. 76 FR 446 - Supplemental Security Income (SSI) for the Aged, Blind, and Disabled; Dedicated Accounts and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2008-0050] RIN 0960-AE59... Payments for Certain Past- Due SSI Benefits AGENCY: Social Security Administration (SSA). ACTION: Final rules. SUMMARY: These final rules adopt, with some minor changes, the interim final rules with request...

  9. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  10. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kupar, J.; Hasek, M.

    The Sanitary Landfill Corrective Action Plan proposes a two pronged approach to remediation. The first part of the total remediation strategy is the placement of a RCRA style closure cap to provide source control of contaminants into the groundwater. The second part of the proposed remediation package is a phased approach primarily using an in situ bioremediation system for groundwater clean up of the Constituents of Concern (COCs) that exceed their proposed Alternate Concentration Limits (ACL). The phased in approach of groundwater clean up will involve operation of the in situ bioremediation system, followed by evaluation of the Phase 1more » system and, if necessary, additional phased remediation strategies. This document presents pertinent information on operations, well locations, anticipated capture zones, monitoring strategies, observation wells and other information which will allow a decision on the acceptability of the remedial strategy as an interim corrective action prior to permit application approval. The proposed interim phase of the remediation program will position two horizontal bioremediation wells such that the respective zones of influence will intersect the migration path for the highest concentrations of each plume.« less

  12. Superfund Record of Decision (EPA Region 1): Otis Air National Guard/Camp Edwards, MA. (First remedial action), May 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-20

    The 22,000-acre Otis National Guard/Camp Edwards site is a former military vehicle maintenance facility on Cape Cod, Massachusetts, within the Massachusetts Military Reservation (MMR). The Area of Contamination Chemical Spill Area Number 4 (AOC CS-4) plume extends 11,000 feet and is located 1.1 miles from the southern boundary of MMR. Wastes and equipment handled at AOC CS-4 included oils, solvents, antifreeze, battery electrolytes, paint, and waste fuels. Additionally, the northern portion of AOC CS-4 was used as a storage yard for wastes generated by shops and laboratories operating at MMR. Liquid wastes were stored in containers or underground storage tanksmore » (USTs) in an unbermed area or deposited in USTs designated for motor gasoline. The ROD addresses OU2, the interim action for MMR AOC CS-4 ground water to prevent further down gradient migration of the contaminants. The primary contaminants of concern affecting the ground water are VOCs, including PCE and TCE.« less

  13. Energy policy act transportation study: Interim report on natural gas flows and rates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-17

    This report, Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates, is the second in a series mandated by Title XIII, Section 1340, ``Establishment of Data Base and Study of Transportation Rates,`` of the Energy Policy Act of 1992 (P.L. 102--486). The first report Energy Policy Act Transportation Study: Availability of Data and Studies, was submitted to Congress in October 1993; it summarized data and studies that could be used to address the impact of legislative and regulatory actions on natural gas transportation rates and flow patterns. The current report presents an interim analysis of naturalmore » gas transportation rates and distribution patterns for the period from 1988 through 1994. A third and final report addressing the transportation rates and flows through 1997 is due to Congress in October 2000. This analysis relies on currently available data; no new data collection effort was undertaken. The need for the collection of additional data on transportation rates will be further addressed after this report, in consultation with the Congress, industry representatives, and in other public forums.« less

  14. An Adaptive Staggered Dose Design for a Normal Endpoint.

    PubMed

    Wu, Joseph; Menon, Sandeep; Chang, Mark

    2015-01-01

    In a clinical trial where several doses are compared to a control, a multi-stage design that combines both the selection of the best dose and the confirmation of this selected dose is desirable. An example is the two-stage drop-the-losers or pick-the-winner design, where inferior doses are dropped after interim analysis. Selection of target dose(s) can be based on ranking of observed effects, hypothesis testing with adjustment for multiplicity, or other criteria at interim stages. A number of methods have been proposed and have made significant gains in trial efficiency. However, many of these designs started off with all doses with equal allocation and did not consider prioritizing the doses using existing dose-response information. We propose an adaptive staggered dose procedure that allows explicit prioritization of doses and applies error spending scheme that favors doses with assumed better responses. This design starts off with only a subset of the doses and adaptively adds new doses depending on interim results. Using simulation, we have shown that this design performs better in terms of increased statistical power than the drop-the-losers design given strong prior information of dose response.

  15. 76 FR 21812 - Defense Federal Acquisition Regulation Supplement; Ownership or Control by a Foreign Government...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... (44 U.S.C. chapter 35). List of Subjects in 48 CFR Parts 209 and 252 Government procurement. Mary...-AG78 Defense Federal Acquisition Regulation Supplement; Ownership or Control by a Foreign Government...). ACTION: Final rule. SUMMARY: DoD is adopting as a final rule, without change, an interim rule that...

  16. Cleanup Verification Package for the 600-47 Waste Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M. J. Cutlip

    This cleanup verification package documents completion of interim remedial action for the 600-47 waste site. This site consisted of several areas of surface debris and contamination near the banks of the Columbia River across from Johnson Island. Contaminated material identified in field surveys included four areas of soil, wood, nuts, bolts, and other metal debris.

  17. 76 FR 4204 - Marketing Order Regulating the Handling of Spearmint Oil Produced in the Far West; Revision of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 985 [Docket Nos. AMS-FV-09-0082; FV10-985-1A IR] Marketing Order Regulating the Handling of Spearmint Oil Produced in the Far West...-2011 Marketing Year AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for...

  18. 76 FR 22785 - Direct Certification and Certification of Homeless, Migrant and Runaway Children for Free School...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... 1309 of the Elementary and Secondary Education Act of 1965 (ESEA). In general, a migrant child is one... Children for Free School Meals AGENCY: Food and Nutrition Service, USDA. ACTION: Interim rule with request... children's eligibility for free meals under the National School Lunch Program and the School Breakfast...

  19. 78 FR 24047 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program, Part 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Employment and Training Administration 20 CFR Part 655 RIN 1205-AB69 Wage Methodology for the Temporary Non-Agricultural Employment H- 2B Program, Part 2 AGENCY: Employment and Training Administration, Labor; U.S. Citizenship and Immigration Services, DHS. ACTION: Interim final rule; request for comments. SUMMARY: The...

  20. 76 FR 40038 - Improving Government Regulations; Unified Agenda of Federal Regulatory and Deregulatory Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... such systems provide timely, reliable information for the management of DoD programs. This interim rule... public impact, their nature may be of public interest and, therefore, are published to provide notice of rulemaking and an opportunity for public participation in the internal DoD rulemaking process. Members of the...

  1. 76 FR 40234 - Drawbridge Operation Regulations; Harlem River, New York City, NY

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ...-AA09 Drawbridge Operation Regulations; Harlem River, New York City, NY AGENCY: Coast Guard, DHS. ACTION... at mile 0.0, across the Harlem River at New York City, New York. This interim rule is necessary to... The 103rd Street (Wards Island) Pedestrian Bridge, across the Harlem River, mile 0.0, at New York City...

  2. Draft Final Risk Assessment Lime Settling Basins. Version 2.1

    DTIC Science & Technology

    1990-10-25

    TABLE OF CON "S Section Page EXECUTIVE SUMMARY ...................................... v 1.0 INTRODUCTION ..................................... 1 - 1 1.1...BACKGROUND AND RATIONALE ........................ 1 - 1 1.2 SUMMARY OF APPROACH ............................. 1 -3 1.3 REPORT FORMAT... 1 -4 2.0 SITE DESCRIPTION AND HISTORY ......................... 2- 1 3.0 PREFERRED ALTERNATIVE INTERIM ACTION TECHNOLOGY ..... 3- 1 4.0

  3. 78 FR 3 - Irish Potatoes Grown in Colorado; Modification of the Handling Regulation for Area No. 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ... marketing agreements and orders may be viewed at: www.ams.usda.gov/MarketingOrdersSmallBusinessGuide . Any... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 948 [Doc. No. AMS-FV-12-0043... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY...

  4. 76 FR 60358 - Gypsy Moth Generally Infested Areas; Additions in Indiana, Maine, Ohio, Virginia, West Virginia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Virginia, and Wisconsin AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Affirmation of... amended the regulations to add areas in Indiana, Maine, Ohio, Virginia, West Virginia, and Wisconsin to..., West Virginia, and Wisconsin to the list of generally infested areas. \\1\\ To view the interim rule and...

  5. 76 FR 67385 - Claims Procedures Under the Oil Pollution Act of 1990

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ...-AA03 Claims Procedures Under the Oil Pollution Act of 1990 AGENCY: Coast Guard, DHS. ACTION: Notice of... finalize a 1992 interim rule that set forth the Oil Pollution Act of 1990 (OPA'90) claims procedures and... Pollution Funds Center, U.S. Coast Guard, telephone (202) 493-6863, email [email protected] . If you...

  6. 78 FR 57257 - Medicare Determinations and Income-Related Monthly Adjustment Amounts to Medicare Part B Premiums...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ...; Conforming Changes to Regulations AGENCY: Social Security Administration. ACTION: Interim final rule with... monthly adjustment amounts (IRMAA) in order to conform to changes made to the Social Security Act (Act) by... SOCIAL SECURITY ADMINISTRATION 20 CFR Parts 404 and 418 [Docket No. SSA-2012-0011] RIN 0960-AH47...

  7. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    NASA Technical Reports Server (NTRS)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  8. 76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ...On July 19, 2010, President Obama signed Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and the Great Lakes (``National Ocean Policy''). The National Ocean Policy provides an implementation strategy, which describes nine priority objectives that seek to address some of the most pressing challenges facing the ocean, our coasts, and the Great Lakes. The National Ocean Council is responsible for developing strategic action plans for each of the nine priority objectives. As a first step, Federal interagency writing teams have developed content outlines for each draft strategic action plan. The NOC is seeking public review and comment of these content outlines. The purpose of the draft content outlines (outlines) is to provide the public with an initial view of potential actions that could be taken to further the national priority objectives. As such, they are an interim step toward development of the first full draft of each strategic action plan. In developing the outlines, the writing teams were informed by the comments received during an initial public scoping period that closed on April 29. Each outline presents in bulleted form potential actions to further the particular priority objective. It describes the reasons for taking the action, expected outcomes and milestones, gaps and needs in science and technology, and the timeframe for completing the action. The outlines also provide an overview of the priority objective, greater context for the strategic action plan in implementing the National Ocean Policy, and an overview of the preparation of the plan . Public comments received on the outlines will be collated and posted on the NOC Web site. The comments on the outlines will inform the preparation of full draft strategic action plans, which will be released for public review in the fall of 2011, allowing additional opportunity for the public to provide comments. Final strategic action plans are expected to be completed by early 2012.

  9. Interim Reflections on the Corporate University and SME Academy Business Development Innovation and Its Diffusion

    ERIC Educational Resources Information Center

    Dealtry, Richard

    2008-01-01

    Purpose: The purpose of this paper is to reflect on and inform about learning points from ECUANET, a two-year duration best practice action research and transnational networking project as it approaches its final stage. Design/methodology/approach: The paper explicates the key positive and obfuscating dynamics that the project team have had to,…

  10. 77 FR 4492 - Endangered and Threatened Wildlife and Plants; Reissuance of Interim Special Rule for the Polar Bear

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-30

    ... order in regard to Misc. No. 08- 764 (EGS) MDL Docket No. 1993 IN RE: POLAR BEAR ENDANGERED SPECIES ACT... (Service), published a final rule listing the polar bear (Ursus maritimus) as a threatened species... Special Rule for the Polar Bear AGENCY: Fish and Wildlife Service, Interior. ACTION: Final rule. SUMMARY...

  11. 78 FR 59791 - Annual Company-Run Stress Tests at Banking Organizations With Total Consolidated Assets of More...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Stress Tests at Banking Organizations With Total Consolidated Assets of More Than $10 Billion But Less... Stress Test Cycle AGENCY: Board of Governors of the Federal Reserve System (Board). ACTION: Interim final... framework) in their stress tests for the stress test cycle that begins October 1, 2013. For this stress test...

  12. Manifestation Determination Reviews and School Team Decision-Making with Students with Emotional/Behavioral Disabilities

    ERIC Educational Resources Information Center

    Walker, Jennifer D.

    2013-01-01

    Manifestation determination teams are required by law to determine the relationship between a student's disability and behaviors that lead to disciplinary action when a student with a disability is either excluded from school for more than 10 days, is put in an interim alternative placement, or is under consideration for a change in placement.…

  13. Turning Points: States in Action. An Interim Report of the Middle Grade School State Policy Initiative.

    ERIC Educational Resources Information Center

    Council of Chief State School Officers, Washington, DC. Resource Center on Educational Equity.

    This report analyzes the experiences of 27 states selected to participate in Carnegie Corporation of New York's Middle Grade School State Policy Initiative (MGSSPI), a 3-year grant program to states to stimulate fundamental reform in schools serving 10- to 15-year old students. MGSSPI states are working to radically transform the education…

  14. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  15. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. [Maywood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  16. Evaluation of ERA-Interim precipitation data in complex terrain

    NASA Astrophysics Data System (ADS)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced overestimate in the southern flank of Alps. The poor topographical and flow related characteristic representation of ERA-Interim model is possibly responsible for the bias. Particularly, the mountain block effect of moisture is weak captured. The comparison demonstrates that ERA-Interim precipitation intensity needs bias correction for further alpine climate studies, although it reasonably captures precipitation frequency. This critical evaluation not only diagnosed the data quality of ERA-Interim, but also provided the evidence for reanalysis products downscaling and bias correction in complex terrain.

  17. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP)more » for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.« less

  18. FY2017 Defense Spending Under an Interim Continuing Resolution (CR): In Brief

    DTIC Science & Technology

    2016-11-07

    Appropriations and Military Construction, Veterans Affairs, and Related Agencies Appropriations Act, 2017, and Zika Response and Preparedness Act...Appropriations and Military Construction, Veterans Affairs, and Related Agencies Appropriations Act, 2017, and Zika Response and Preparedness Act, into

  19. 16 CFR 1209.40 - Certification responsibility, multiple parties.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Certification responsibility, multiple parties. 1209.40 Section 1209.40 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.40...

  20. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  1. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  2. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  3. Diffuse Large B-Cell Lymphoma: Prospective Multicenter Comparison of Early Interim FLT PET/CT versus FDG PET/CT with IHP, EORTC, Deauville, and PERCIST Criteria for Early Therapeutic Monitoring

    PubMed Central

    Minamimoto, Ryogo; Fayad, Luis; Advani, Ranjana; Vose, Julie; Macapinlac, Homer; Meza, Jane; Hankins, Jordan; Mottaghy, Felix; Juweid, Malik

    2016-01-01

    Purpose To compare the performance characteristics of interim fluorine 18 (18F) fluorodeoxyglucose (FDG) positron emission tomography (PET)/computed tomography (CT) (after two cycles of chemotherapy) by using the most prominent standardized interpretive criteria (including International Harmonization Project [IHP] criteria, European Organization for Research and Treatment of Cancer [EORTC] criteria, and PET Response Criteria in Solid Tumors (PERCIST) versus those of interim 18F fluorothymidine (FLT) PET/CT and simple visual interpretation. Materials and Methods This HIPAA-compliant prospective study was approved by the institutional review boards, and written informed consent was obtained. Patients with newly diagnosed diffuse large B-cell lymphoma (DLBCL) underwent both FLT and FDG PET/CT 18–24 days after two cycles of rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisone or rituximab, etoposide, prednisone, vincristine, cyclophosphamide, and doxorubicin. For FDG PET/CT interpretation, IHP criteria, EORTC criteria, PERCIST, Deauville criteria, standardized uptake value, total lesion glycolysis, and metabolic tumor volume were used. FLT PET/CT images were interpreted with visual assessment by two reviewers in consensus. The interim (after cycle 2) FDG and FLT PET/CT studies were then compared with the end-of-treatment FDG PET/CT studies to determine which interim examination and/or criteria best predicted the result after six cycles of chemotherapy. Results From November 2011 to May 2014, there were 60 potential patients for inclusion, of whom 46 patients (24 men [mean age, 60.9 years ± 13.7; range, 28–78 years] and 22 women [mean age, 57.2 years ± 13.4; range, 25–76 years]) fulfilled the criteria. Thirty-four patients had complete response, and 12 had residual disease at the end of treatment. FLT PET/CT had a significantly higher positive predictive value (PPV) (91%) in predicting residual disease than did any FDG PET/CT interpretation method (42%–46%). No difference in negative predictive value (NPV) was found between FLT PET/CT (94%) and FDG PET/CT (82%–95%), regardless of the interpretive criteria used. FLT PET/CT showed statistically higher (P < .001–.008) or similar NPVs than did FDG PET/CT. Conclusion Early interim FLT PET/CT had a significantly higher PPV than standardized FDG PET/CT–based interpretation for therapeutic response assessment in DLBCL. © RSNA, 2016 Online supplemental material is available for this article. PMID:26854705

  4. Evaluation of historical and analytical data on the TAN TSF-07 Disposal Pond

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Medina, S.M.

    1993-07-01

    The Technical Support Facility (TSF)-07 Disposal Pond, located at Test Area North at the Idaho National Engineering Laboratory, has been identified as part of Operable Unit 1-06 under the Comprehensive Environmental Response, Compensation, and Liability Act. The Environmental Restoration and Waste Management Department is conducting an evaluation of existing site characterization data for the TSF-07 Disposal Pond Track 1 investigation. The results from the site characterization data will be used to determine whether the operable unit will undergo a Track 2 investigation, an interim action, a remedial investigation/feasibility study, or result in a no-action decision. This report summarizes activities relevantmore » to wastewaters discharged to the pond and characterization efforts conducted from 1982 through 1991. Plan view and vertical distribution maps of the significant contaminants contained in the pond are included. From this evaluation it was determined that cobalt-60, cesium-137, americium-241, mercury, chromium, and thallium are significant contaminants for soils. This report also evaluates the migration tendencies of the significant contaminants into the perched water zone under the pond and the surrounding terrain to support the investigation.« less

  5. Formerly Utilized Sites Remedial Action Program (FUSRAP) Hazelwood Interim Storage Site annual site environmental report. Calendar year 1985. [FUSRAP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-04-01

    The Hazelwood Interim Storage Site (HISS) is presently used for the storage of low-level radioactively contaminated soils. Monitoring results show that the HISS is in compliance with DOE concentration guides and radiation protection standards. Derived Concentration Guides (DCGs) represent the concentrations of radionuclides in air or water that would limit the radiation dose to 100 mrem/y. The applicable limits have been revised since the 1984 environmental monitoring report was published. The limits applied in 1984 were based on a radiation protection standard of 500 mrem/y; the limits applied for 1985 are based on a standard of 100 mrem/y. The HISSmore » is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where low-level radioactive contamination remains from the early years of the nation's atomic energy program. To determine whether the site is in compliance with DOE standards, environmental measurements are expressed as percentages of the applicable DCG, while the calculated doses to the public are expressed as percentages of the applicable radiation protection standard. The monitoring program at the HISS measures uranium, radium, and thorium concentrations in surface water, groundwater, and sediment; radon gas concentrations in air; and external gamma radiation exposure rates. Potential radiation doses to the public are also calculated. The HISS was designated for remedial action under FUSRAP because radioactivity above applicable limits was found to exist at the site and its vicinity. Elevated levels of radiation still exist in areas where remedial action has not yet been completed.« less

  6. 75 FR 37712 - Temporary Suspension of Certain Oil Spill Response Time Requirements To Support Deepwater Horizon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    .... (Memorandum from Rear Admiral J.A. Watson, FOSC BP Deepwater Horizon Oil Spill, to National Incident Command... Temporary Suspension of Certain Oil Spill Response Time Requirements To Support Deepwater Horizon Oil Spill... Protection Agency (EPA) temporary interim rule will suspend oil spill response time requirements, and certain...

  7. Health Resources Priority and Allocations System (HRPAS). Interim final rule.

    PubMed

    2015-07-17

    This interim final rule establishes standards and procedures by which the U.S. Department of Health and Human Services (HHS) may require that certain contracts or orders that promote the national defense be given priority over other contracts or orders. This rule also sets new standards and procedures by which HHS may allocate materials, services, and facilities to promote the national defense. This rule will implement HHS's administration of priorities and allocations actions, and establish the Health Resources Priorities and Allocation System (HRPAS). The HRPAS will cover health resources pursuant to the authority under Section 101(c) of the Defense Production Act as delegated to HHS by Executive Order 13603. Priorities authorities (and other authorities delegated to the Secretary in E.O. 13603, but not covered by this regulation) may be re-delegated by the Secretary. The Secretary retains the authority for allocations.

  8. Interim Draft: Biological Sampling and Analysis Plan Outline ...

    EPA Pesticide Factsheets

    Standard Operation Procedures This interim sampling and analysis plan (SAP) outline was developed specifically as an outline of the output that will be generated by a developing on-line tool called the MicroSAP. The goal of the MicroSAP tool is to assist users with development of SAPs needed for site characterization, verification sampling, and post decontamination sampling stages of biological sampling and analysis activities in which the EPA would be responsible for conducting sampling. These activities could include sampling and analysis for a biological contamination incident, a research study, or an exercise. The development of this SAP outline did not consider the initial response of an incident, as it is assumed that the initial response would have been previously completed by another agency during the response, or the clearance phase, as it is assumed that separate committee would be established to make decisions regarding clearing a site. This outline also includes considerations for capturing the associated data quality objectives in the SAP.

  9. Israel: Background and U.S. Relations in Brief

    DTIC Science & Technology

    2017-01-06

    future Israeli-Palestinian negotiations by Secretary of State John Kerry on December 28, 2016, and other statements and actions related to issues of...Interim Agreement; permanent status to be determined through further negotiation . The status of the Gaza Strip is a final status issue to be resolved...through negotiations . Israel proclaimed Jerusalem as its capital in 1950, but the United States, like nearly all other countries, retains its embassy in

  10. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan... notified the MPO and DOT; and (10) VOC, SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator... effect in the analysis year, except that regulatory TCMs may not be assumed to begin at a future time...

  11. Superfund record of decision (EPA Region 4): Marine Corps Base (site 35), operable unit 10, Camp Lejeune, NC, September 22, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-01

    This decision document presents the selected remedy for surficial groundwater for a portion of Operable Unit (OU) No. 10 (Site 35), Marine Corps Base (MCB), Camp Lejeune, North Carolina. Five Remedial Action Alternatives (RAAs) were evaluated as part of an interim remedial investigation/feasibility study for surficial groundwater at OU No. 10 (Site 35). These RAAs included RAA 1 (No Action), RAA 2 (No Action With Institutional Controls), RAA 3 (Groundwater Collection and On-site Treatment), RAA 4 (In Situ Air Sparging and Off-Gas Carbon Adsorption) and RAA 5 (In Well Aeration and Off-Gas Adsorption). After all five RAAs were compared tomore » established criteria, RAA 5 was selected as the preferred alternative.« less

  12. 75 FR 16202 - Office of New Reactors; Interim Staff Guidance on Ensuring Hazard-Consistent Seismic Input for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... Staff Guidance on Ensuring Hazard-Consistent Seismic Input for Site Response and Soil Structure...-Consistent Seismic Input for Site Response and Soil Structure Interaction Analyses,'' (Agencywide Documents... Soil Structure Interaction Analyses,'' (ADAMS Accession No. ML092230455) to solicit public and industry...

  13. 75 FR 36715 - Advisory Committee on Reactor Safeguards; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... Seismic Input for Site Response and Soil Structure Interaction Analyses'' (Open)--The Committee will hold... Seismic Input for Site Response and Soil Structure Interaction Analyses.'' 9:30 a.m.-10:30 a.m.: Interim Staff Guidance (ISG) DC/COL-ISG-020, ``Implementation of Seismic Margin Analysis for New Reactors Based...

  14. NASA Standard for Models and Simulations: Credibility Assessment Scale

    NASA Technical Reports Server (NTRS)

    Babula, Maria; Bertch, William J.; Green, Lawrence L.; Hale, Joseph P.; Moser, Gary E.; Steele, Martin J.; Sylvester, Andre; Woods, Jody

    2008-01-01

    As one of its many responses to the 2003 Space Shuttle Columbia accident, NASA decided to develop a formal standard for models and simulations (M and S)ii. Work commenced in May 2005. An interim version was issued in late 2006. This interim version underwent considerable revision following an extensive Agency-wide review in 2007 along with some additional revisions as a result of the review by the NASA Engineering Management Board (EMB) in the first half of 2008. Issuance of the revised, permanent version,hereafter referred to as the M and S Standard or just the Standard, occurred in July 2008.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benioff, R.; Ness, E.; Hirst, J.

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date withmore » the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.« less

  16. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less

  17. Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation.

    DTIC Science & Technology

    1982-06-01

    these conditions . Therefore, the no-action plan is not being recommended. With the present channel conditions and anticipated slow growth for... conditions very similar to those of today. No ocean disposal is anticipated. Because no significant growth in socioeconomic activity is expected without...accuracy; however, project construction provides conditions favorable for growth . The service industry would be expected to closely follow any increase

  18. JPRS Report, Near East & South Asia, Pakistan

    DTIC Science & Technology

    1992-06-11

    of emotion , and, at the end of the 14-year crisis in Afghanistan, form an interim council government of the mujaheddin; and, with unanimous...masses of Afghanistan came to our country, they were accompanied by their criminal, terrorist, antisocial , and enemy agents. There was no way for us to...Sindh is the irresponsible behaviour , incompetence and lack of action by the police. Had it not been for the police department’s failure to carry

  19. Analysis of Transportation Options for Commercial Spent Fuel in the U.S.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalinina, Elena; Busch, Ingrid Karin

    The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less

  20. The Responsiveness of Public Schools to Their Clientele. Milestone 1: Report of Progress.

    ERIC Educational Resources Information Center

    Zeigler, L. Harmon; And Others

    An analysis of the literature dealing with the responsiveness of public institutions to their clientele constitutes the main body of this interim project report. The analysts adopted Dahl and Lindblom's classification of political decision-making processes for summarizing the range of governing systems possible in public education. These four…

  1. Subscriber Response System; El Segundo Interim Test Report.

    ERIC Educational Resources Information Center

    Callais, Richard T.

    A new cable television system, called the Subscriber Response System (SRS), is being tested prior to a trial installation in El Segundo, California. The components include two bidirectional cables, a computer for processing subscribers' requests, and subscriber terminals to be located in homes or offices. The home terminal includes a three-digit…

  2. Tribal child welfare. Interim final rule.

    PubMed

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  3. Health Effects Assessment for Bromomethane

    EPA Science Inventory

    The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...

  4. Health Effects Assessment for Ammonia

    EPA Science Inventory

    The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...

  5. Health Effects Assessment for Acenaphthylene

    EPA Science Inventory

    The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...

  6. 5 CFR 591.223 - When does OPM conduct COLA surveys?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... conducting interim surveys or implementing some other change in response to conditions caused by a natural disaster or similar emergency, provided OPM publishes a notice or rule in the Federal Register explaining...

  7. 5 CFR 591.223 - When does OPM conduct COLA surveys?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... conducting interim surveys or implementing some other change in response to conditions caused by a natural disaster or similar emergency, provided OPM publishes a notice or rule in the Federal Register explaining...

  8. 5 CFR 591.223 - When does OPM conduct COLA surveys?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... conducting interim surveys or implementing some other change in response to conditions caused by a natural disaster or similar emergency, provided OPM publishes a notice or rule in the Federal Register explaining...

  9. Interim Enforcement Program Response Guidance to Public Data Access Issues

    EPA Pesticide Factsheets

    Written to assist EPA and states when the ECHO web site was launched, this document provides guidance on questions that can arise when compliance and enforcement data are made available to the public.

  10. Health Effects Assessment for Acrylonitrile

    EPA Science Inventory

    The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...

  11. Study of Anticyclogenesis Affecting the Mediterranean

    NASA Astrophysics Data System (ADS)

    Hatzaki, M.; Flocas, H. A.; Simmonds, I.; Kouroutzoglou, J.; Garde, L.; Keay, K.; Bitsa, E.

    2014-12-01

    A comprehensive climatology of migratory anticyclones affecting the Mediterranean was generated by the University of Melbourne finding and tracking algorithm (MS algorithm), applied to 34 years (1979-2012) of ERA-Interim MSLP on a 1.5°x1.5° resolution. The algorithm was employed for the first time for anticyclones in this region, thus, its robustness and reliability in efficiently capturing the individual characteristics of the anticyclonic tracks in such a closed basin with complex topography were checked and verified. Then, the tracks and the statistical properties of the migratory systems were calculated and analyzed. Considering that cold-core anticyclones are shallow and weaken with height contrary to the warm-core that exhibit a vertically well-organized structure, the vertical thermal extend of the systems was studied with an algorithm developed as an extension module of the MS algorithm using ERA-Interim temperatures on several isobaric levels from 1000hPa to 100hPa on an 1.5°x1.5° resolution. The results verified that during both cold and warm period, cold-core anticyclones mainly affect the northern parts of the Mediterranean basin, with their behavior to be strongly regulated by cyclonic activity from the main storm track areas of the North Atlantic and Europe. On the other hand, warm-core anticyclones were found mainly in the southern Mediterranean and North African areas. Here, in order to get a perspective on the dynamic and thermodynamic processes in anticyclonic formation, a dynamical analysis at several vertical levels is performed. The study of mean fields of potential vorticity, temperature advection, vorticity advection at various levels can elucidate the role of upper and low levels during anticyclogenesis and system evolvement and help to further understand the dynamic mechanisms which are responsible for the anticyclogenesis over the Mediterranean region. Acknowledgement: This research project is implemented within the framework of the Action «Supporting Postdoctoral Researchers» of the Operational Program "Education and Lifelong Learning" (Action's Beneficiary: General Secretariat for Research and Technology) and is co-financed by the European Social Fund (ESF) and the Greek State. Some funding from the Australian Research Council is also acknowledged.

  12. Superfund record of decision (EPA Region 1): Otis Air National Guard (containment of 7 groundwater plumes), Falmouth, MA, September 25, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    The Massachusetts Military Reservation (MMR) on Cape Cod, Massachusettes lies within the boundaries of Bourne, Mashpee, and Sandwich, and abuts Falmouth. Seven groundwater contaminant plumes have migrated beyond or are approaching the installation boundary. This interim remedial action will intercept the contaminated groundwater plumes to prevent further downgradient movement of the contaminants. Extraction and treatment will continue until the final remedy for the site is chosen.

  13. Wayne Interim Storage Site environmental report for calendar year 1992, 868 Black Oak Ridge Road, Wayne, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure;more » radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.« less

  14. Medicus Petrus Hispanus (c1205-77 Peter of Spain): a XIII century Pope and Author of a Medieval Sex Guide.

    PubMed

    Ambrose, Charles T

    2013-05-01

    Petrus Hispanus was the only practicing physician ever to become Pope (1276-77). By all accounts he was an interim choice when rival French and Italian Cardinals could not elect one of their own nationality. Although not clearly responsible for any major political actions by the Church, Petrus was famous for several centuries after his death because of his secular writings - a text on logic (Summulae logicales) and a handbook on medicine (Thesaurus pauperum). The latter is noteworthy because it contains two sections on coitus - how to enhance the sexual act and how to subdue sexual urges. Promoting coitus seems an odd topic for a medieval Catholic cleric-writer and raises the question as to whether the first section may have been added by a later copyist or editor, but an examination of a very early manuscript of the Thesaurus gives assurance that the two sexual sections were written by Petrus, probably around 1270.

  15. [Response to US review rules on patent subject matter of traditional Chinese medicine compositions].

    PubMed

    Liu, Pan; Cao, Ya-di; Gong, Rui-Juan; Liu, Wei

    2018-02-01

    The United States Patent and Trademark Office(USPTO) issued Interim Guidance on Patent Subject Matter Eligibility on December 16, 2014, bringing certain effects to the review rules on patent application of Chinese medicine compositions. Based on the Interim Guidance, cases analysis was used in this paper to analyze the patent subject matter issues of traditional Chinese medicine compositions in the United States. The researches have shown that the application documents should be properly written in the United States when the patent for Chinese medicine compositions is applied, which can improve the probability of authorization. Copyright© by the Chinese Pharmaceutical Association.

  16. Coverage of Certain Preventive Services Under the Affordable Care Act. Final rules.

    PubMed

    2015-07-14

    This document contains final regulations regarding coverage of certain preventive services under section 2713 of the Public Health Service Act (PHS Act), added by the Patient Protection and Affordable Care Act, as amended, and incorporated into the Employee Retirement Income Security Act of 1974 and the Internal Revenue Code. Section 2713 of the PHS Act requires coverage without cost sharing of certain preventive health services by non-grandfathered group health plans and health insurance coverage. These regulations finalize provisions from three rulemaking actions: Interim final regulations issued in July 2010 related to coverage of preventive services, interim final regulations issued in August 2014 related to the process an eligible organization uses to provide notice of its religious objection to the coverage of contraceptive services, and proposed regulations issued in August 2014 related to the definition of "eligible organization,'' which would expand the set of entities that may avail themselves of an accommodation with respect to the coverage of contraceptive services.

  17. Combined Modality Treatment for PET-Positive Non-Hodgkin Lymphoma: Favorable Outcomes of Combined Modality Treatment for Patients With Non-Hodgkin Lymphoma and Positive Interim or Postchemotherapy FDG-PET

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Halasz, Lia M.; Jacene, Heather A.; Catalano, Paul J.

    2012-08-01

    Purpose: To evaluate outcomes of patients treated for aggressive non-Hodgkin lymphoma (NHL) with combined modality therapy based on [{sup 18}F]fluoro-2-deoxy-2-D-glucose positron emission tomography (FDG-PET) response. Methods and Materials: We studied 59 patients with aggressive NHL, who received chemotherapy and radiation therapy (RT) from 2001 to 2008. Among them, 83% of patients had stage I/II disease. Patients with B-cell lymphoma received R-CHOP (rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisone)-based chemotherapy, and 1 patient with anaplastic lymphoma kinase-negative anaplastic T-cell lymphoma received CHOP therapy. Interim and postchemotherapy FDG-PET or FDG-PET/computed tomography (CT) scans were performed for restaging. All patients received consolidated involved-field RT.more » Median RT dose was 36 Gy (range, 28.8-50 Gy). Progression-free survival (PFS) and local control (LC) rates were calculated with and without a negative interim or postchemotherapy FDG-PET scan. Results: Median follow-up was 46.5 months. Thirty-nine patients had negative FDG-PET results by the end of chemotherapy, including 12 patients who had a negative interim FDG-PET scan and no postchemotherapy PET. Twenty patients were FDG-PET-positive, including 7 patients with positive interim FDG-PET and no postchemotherapy FDG-PET scans. The 3-year actuarial PFS rates for patients with negative versus positive FDG-PET scans were 97% and 90%, respectively. The 3-year actuarial LC rates for patients with negative versus positive FDG-PET scans were 100% and 90%, respectively. Conclusions: Patients who had a positive interim or postchemotherapy FDG-PET had a PFS rate of 90% at 3 years after combined modality treatment, suggesting that a large proportion of these patients can be cured with consolidated RT.« less

  18. The role of the Data and Safety Monitoring Board in a clinical trial: The CRISIS Study

    PubMed Central

    Holubkov, Richard; Casper, T. Charles; Dean, J. Michael; Anand, K. J. S.; Zimmerman, Jerry; Meert, Kathleen L.; Newth, Christopher J. L.; Berger, John; Harrison, Rick; Willson, Douglas F.; Nicholson, Carol

    2012-01-01

    Objective Randomized clinical trials are commonly overseen by a data and safety monitoring board (DSMB) comprised of experts in medicine, ethics, and biostatistics. DSMB responsibilities include protocol approval, interim review of study enrollment, protocol compliance, safety, and efficacy data. DSMB decisions can affect study design and conduct, as well as reported findings. Researchers must incorporate DSMB oversight into the design, monitoring, and reporting of randomized trials. Design Case study, narrative review. Methods The DSMB’s role during the comparative pediatric Critical Illness Stress-Induced Immune Suppression (CRISIS) Prevention Trial is described. Findings The NIH-appointed CRISIS DSMB was charged with monitoring sample size adequacy and feasibility, safety with respect to adverse events and 28-day mortality, and efficacy with respect to the primary nosocomial infection/sepsis outcome. The Federal Drug Administration also requested DSMB interim review before opening CRISIS to children below one year of age. The first interim analysis found higher 28-day mortality in one treatment arm. The DSMB maintained trial closure to younger children, and requested a second interim data review six months later. At this second meeting, mortality was no longer of concern, while a weak efficacy trend of lower infection/sepsis rates in one study arm emerged. As over 40% of total patients had been enrolled, the DSMB elected to examine conditional power, and unmask treatment arm identities. Upon finding somewhat greater efficacy in the placebo arm, the DSMB recommended stopping CRISIS due to futility. Conclusions The design and operating procedures of a multicenter randomized trial must consider a pivotal DSMB role. Maximum study design flexibility must be allowed, and investigators must be prepared for protocol modifications due to interim findings. The DSMB must have sufficient clinical and statistical expertise to assess potential importance of interim treatment differences in the setting of multiple looks at accumulating data with numerous outcomes and subgroups. PMID:23392377

  19. The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voegele, Michael D.; Vieth, Donald

    2013-07-01

    The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should bemore » implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)« less

  20. HEALTH EFFECTS ASSESSMENT FOR VANADIUM AND COMPOUNDS

    EPA Science Inventory

    The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...

  1. Updated Health Effects Assessment for Chloroform

    EPA Science Inventory

    This report summarizes and evaluates infornation relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analys...

  2. Updated Health Effects Assessment for Acetone

    EPA Science Inventory

    This report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analys...

  3. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  4. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  5. 77 FR 66482 - Notice of Lodging of Proposed Consent Decree Under the Comprehensive Environmental Response...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... CERCLA with respect to past response costs, the interim remedy for volatile organic compounds, or for... Justice Department Web site: http://www.usdoj.gov/enrd/Consent_Decrees.html . We will provide a paper copy... United States Treasury. For a paper copy without the exhibits and signature pages, the cost is $5.50...

  6. Health Effects Assessment for Carbon Tetrachloride (Updated 1989)

    EPA Science Inventory

    This report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analys...

  7. Evaluation of arterial service patrol programs.

    DOT National Transportation Integrated Search

    2009-12-01

    This evaluation of the Arterial Service Patrol named I-64 Traffic Response (TR) is an interim report covering the first full year of operation. This Arterial Service Patrol was part of a regional traffic management strategy to address mobility issues...

  8. 75 FR 70126 - Safety Zone; Fireworks Displays, Potomac River, National Harbor, MD

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... of docket USCG-2010-0776 and are available online by going to http://www.regulations.gov , inserting... Guard received a total of one piece of correspondence in response to the temporary interim rule. No...

  9. Interim Policy on Stack Height Regulatory Actions

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. Superfund record of decision (EPA Region 6): Longhorn Army Ammunition Plant, Burning Ground Number 3, Karnack, TX, May 12, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This decision document presents the selected Early Interim Remedial Action for the Burning Ground No. 3 site (the site), Longhorn Army Ammunition Plant, in Karnack, Texas. The major components of the selected remedy include: extraction and Treatment of contaminated shallow groundwater using Organic Air Stripping and Off-gas Treatment and Metals precipitation, and Excavation and Treatment of Source Material using Low Temperature Thermal Desorption and Catalytic Oxidation for off-gas.

  11. IRIS thermal balance test within ESTEC LSS

    NASA Technical Reports Server (NTRS)

    Messidoro, Piero; Ballesio, Marino; Vessaz, J. P.

    1988-01-01

    The Italian Research Interim Stage (IRIS) thermal balance test was successfully performed in the ESTEC Large Space Simulator (LSS) to qualify the thermal design and to validate the thermal mathematical model. Characteristics of the test were the complexity of the set-up required to simulate the Shuttle cargo bay and allowing IRIS mechanism actioning and operation for the first time in the new LSS facility. Details of the test are presented, and test results for IRIS and the LSS facility are described.

  12. Desert Shield and Desert Storm Emerging Observations

    DTIC Science & Technology

    1991-10-07

    harsh elements. d. Recommended actions. (1) Relocate APU to bustle rack on turret as an interim solution. (2) Development of an under armor APU. e...statement has been written that states an under armor APU Lu needed for the current NMT. (1) Textron Lycominq has developed an under armor APU as part...FPR OFFICiIA 0M FOR OFFICIAL Uf[ ONf.Y c. Losson(s) Learned. (1) Acquisition of a mobile, survivable rearm vehicle is required to provide an " under

  13. Rolling out of kangaroo mother care in secondary level facilities in Bihar-Some experiences.

    PubMed

    Neogi, Sutapa B; Chauhan, Monika; Sharma, Jyoti; Negandhi, Preeti; Sethy, Ghanshyam

    2016-01-01

    Preterm birth is one of the leading causes of under-five child deaths worldwide and in India. Kangaroo mother care (KMC) is a powerful and easy-to-use method to promote health and well-being and reduce morbidity and mortality in preterm/low birth weight (LBW) babies. As the part of the roll-out of India Newborn Action Plan interventions, we implemented KMC in select facilities with an objective to assess the responsiveness of public health system to roll out KMC. KMC intervention was implemented in two select high priority districts, Gaya and Purnea in Bihar over the duration of 8 months from August 2015 to March 2016. The implementation of intervention was phased out into; situation analysis, implementation of intervention, and interim assessment. KMC model, as envisaged keeping in mind the building blocks of health system, was established in 6 identified health-care facilities. A pretested simple checklist was used to assess the awareness, knowledge, skills, and practice of KMC during baseline situational analysis and interim assessment phases for comparison. The intervention clearly seemed to improve the awareness among auxiliary nurse midwives/nurses about KMC. Improvements were also observed in the availability of infrastructure required for KMC and support logistics like facility for manual expression of breast milk, cups/suitable devices such as paladi cups for feeding small babies and digital weighing scale. Although the recording of information regarding LBW babies and KMC practice improved, still there is scope for much improvement. There is a commitment at the national level to promote KMC in every facility. The present experience shows the possibility of rolling out KMC in secondary level facilities with support from government functionaries.

  14. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    PubMed

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  15. Updating Dosimetry for Emergency Response Dose Projections.

    PubMed

    DeCair, Sara

    2016-02-01

    In 2013, the U.S. Environmental Protection Agency (EPA) proposed an update to the 1992 Protective Action Guides (PAG) Manual. The PAG Manual provides guidance to state and local officials planning for radiological emergencies. EPA requested public comment on the proposed revisions, while making them available for interim use by officials faced with an emergency situation. Developed with interagency partners, EPA's proposal incorporates newer dosimetric methods, identifies tools and guidelines developed since the current document was issued, and extends the scope of the PAGs to all significant radiological incidents, including radiological dispersal devices or improvised nuclear devices. In order to best serve the emergency management community, scientific policy direction had to be set on how to use International Commission on Radiological Protection Publication 60 age groups in dose assessment when implementing emergency guidelines. Certain guidelines that lend themselves to different PAGs for different subpopulations are the PAGs for potassium iodide (KI), food, and water. These guidelines provide age-specific recommendations because of the radiosensitivity of the thyroid and young children with respect to ingestion and inhalation doses in particular. Taking protective actions like using KI, avoiding certain foods or using alternative sources of drinking water can be relatively simple to implement by the parents of young children. Clear public messages can convey which age groups should take which action, unlike how an evacuation or relocation order should apply to entire households or neighborhoods. New in the PAG Manual is planning guidance for the late phase of an incident, after the situation is stabilized and efforts turn toward recovery. Because the late phase can take years to complete, decision makers are faced with managing public exposures in areas not fully remediated. The proposal includes quick-reference operational guidelines to inform re-entry to the contaminated zone. Broad guidance on approaches to wide-area cleanup and cleanup goals is also provided. EPA adapted the cleanup process from the 2008 U.S. Department of Homeland Security (DHS) Planning Guidance for Protection and Recovery Following Radiological Dispersal Device (RDD) and Improvised Nuclear Device (IND) Incidents, and the final PAG Manual will supersede that DHS guidance. Waste management guidance is also provided. Recognizing that an incident could result in radioactive waste volumes that severely strain or exceed available resources and capacity, officials may consider alternatives for disposal of waste that is relatively lightly contaminated. Waste management, including treatment, staging, and interim and long-term storage, must be an integral part of recovery.

  16. Technical Operations (TOPS) IV Task Order 0003: Responsive Interface for Transport Tuning (RITT)

    DTIC Science & Technology

    2016-05-29

    on the further development of artificial hair sensors (AHS) featuring a responsive carbon nanotube (CNT) array to serve as a piezoresistive element...under separate cover, as AFRL Interim Report AFRL-RX-WP-TR-2016-0071 dated 30 October 2015. 15. SUBJECT TERMS artificial hair sensor, carbon... Hair Sensors: Fabrication and Model Parameterization .......................... 4 3.1.1 Introduction

  17. The use of micro-surfacing for pavement preservation : interim report, first year, May 2004.

    DOT National Transportation Integrated Search

    2004-05-01

    The Maine Department of Transportation (MDOT) is responsible for maintaining approximately 14,000 : kilometers of public highways. Maintenance of these highways consists of rehabilitation or reconstruction : when the road has deteriorated to an unacc...

  18. Effects of aviation noise on awakenings from sleep

    DOT National Transportation Integrated Search

    1997-06-01

    The effect of aviation noise on sleep is a long-recognized concern of those interested in addressing the impacts of noise on people. In 1992, the Federal Interagency Committee on Noise (FICON) recommended an interim dose-response curve to predict the...

  19. 78 FR 35314 - Notice of Lodging of Proposed Consent Decree Under the Comprehensive Environmental Response...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... proposed settlement entitled ``Interim Past Costs Consent Decree'' (the ``Consent Decree'') with the United... Department Web site: http://www.justice.gov/enrd/Consent_Decrees.htm . We will provide a paper copy of the...

  20. 40 CFR 265.54 - Amendment of contingency plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 265.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND..., explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary...

  1. 40 CFR 265.54 - Amendment of contingency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 265.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND..., explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary...

  2. The small-scale treatability study sample exemption

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coalgate, J.

    1991-01-01

    In 1981, the Environmental Protection Agency (EPA) issued an interim final rule that conditionally exempted waste samples collected solely for the purpose of monitoring or testing to determine their characteristics or composition'' from RCRA Subtitle C hazardous waste regulations. This exemption (40 CFR 261.4(d)) apples to the transportation of samples between the generator and testing laboratory, temporary storage of samples at the laboratory prior to and following testing, and storage at a laboratory for specific purposes such as an enforcement action. However, the exclusion did not include large-scale samples used in treatability studies or other testing at pilot plants ormore » other experimental facilities. As a result of comments received by the EPA subsequent to the issuance of the interim final rule, the EPA reopened the comment period on the interim final rule on September 18, 1987, and specifically requested comments on whether or not the sample exclusion should be expanded to include waste samples used in small-scale treatability studies. Almost all responders commented favorably on such a proposal. As a result, the EPA issued a final rule (53 FR 27290, July 19, 1988) conditionally exempting waste samples used in small-scale treatability studies from full regulation under Subtitle C of RCRA. The question of whether or not to extend the exclusion to larger scale as proposed by the Hazardous Waste Treatment Council was deferred until a later date. This information Brief summarizes the requirements of the small-scale treatability exemption.« less

  3. The medical decision model and decision maker tools for management of radiological and nuclear incidents.

    PubMed

    Koerner, John F; Coleman, C Norman; Murrain-Hill, Paula; FitzGerald, Denis J; Sullivan, Julie M

    2014-06-01

    Effective decision making during a rapidly evolving emergency such as a radiological or nuclear incident requires timely interim decisions and communications from onsite decision makers while further data processing, consultation, and review are ongoing by reachback experts. The authors have recently proposed a medical decision model for use during a radiological or nuclear disaster, which is similar in concept to that used in medical care, especially when delay in action can have disastrous effects. For decision makers to function most effectively during a complex response, they require access to onsite subject matter experts who can provide information, recommendations, and participate in public communication efforts. However, in the time before this expertise is available or during the planning phase, just-in-time tools are essential that provide critical overview of the subject matter written specifically for the decision makers. Recognizing the complexity of the science, risk assessment, and multitude of potential response assets that will be required after a nuclear incident, the Office of the Assistant Secretary for Preparedness and Response, in collaboration with other government and non-government experts, has prepared a practical guide for decision makers. This paper illustrates how the medical decision model process could facilitate onsite decision making that includes using the deliberative reachback process from science and policy experts and describes the tools now available to facilitate timely and effective incident management.

  4. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites wheremore » residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.« less

  5. 40 CFR 265.113 - Closure; time allowed for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... includes an amended waste analysis plan, ground-water monitoring and response program, human exposure....113 Section 265.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...

  6. Tire/pavement and environmental traffic noise research study : interim report - 2009 testing.

    DOT National Transportation Integrated Search

    2011-01-01

    This research study is being conducted in response to CDOTs interest in traffic noise in general, and the tire/pavement : interaction in particular. Following a rigid set of testing protocols, data is being collected on highway traffic noise : cha...

  7. The use of micro-surfacing for pavement preservation : interim report - second, third, fourth year, December, 2005.

    DOT National Transportation Integrated Search

    2005-12-01

    The Maine Department of Transportation (MDOT) is responsible for maintaining approximately 14,000 : kilometers of public highways. Maintenance of these highways consists of rehabilitation or reconstruction : when the road has deteriorated to an unacc...

  8. 40 CFR 142.22 - Review of State variances, exemptions and schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... (and schedules prescribed pursuant thereto) by the States with primary enforcement responsibility...

  9. Leadership Times Four.

    ERIC Educational Resources Information Center

    Smith, Roberta F.

    2003-01-01

    Describes Albuquerque (New Mexico) Public School's board of education's experience with an interim, four-person superintendency team appointed by the board to replace the previous superintendent. The team was composed of three associate superintendents and a local public-relations executive. Includes a brief description of the responsibilities and…

  10. Explorative analyses on the value of interim PET for prediction of response in pediatric and adolescent non-Hodgkin lymphoma patients

    PubMed Central

    2013-01-01

    Background This study is to evaluate the predictive value of FDG-PET (PET) in pediatric and adolescent patients suffering from non-Hodgkin lymphoma (pNHL) in comparison to information provided by conventional imaging methods (CIM). Methods Imaging was performed at baseline and at interim (after 2 cycles of chemotherapy). The response assessment in PET was carried out visually and semi-quantitatively, the latter one by use of percentage decrease in SUVmax from baseline to interim (ΔSUVmax). The PET-based results were compared to the findings by CIM. Progression-free survival (PFS) was analyzed using Kaplan-Meier curves (KM) and log-rank test. Results The final study included 16 patients (mean follow-up time, 60.2 months (range, 4.0 to 85.7 months)). Relapse occurred in four patients. Visual PET compared to CIM revealed higher sensitivity (3/4 vs 1/4) and NPV (6/7 vs 10/13), and equal PPV (3/9 vs 1/3), but lower specificity (6/12 vs 10/12) and accuracy (9/16 vs 11/16). False-positive findings in PET at interim were predominantly observed in patients presenting bulky disease (5/6), whereas CIM was true-negative in all of these cases. KM analyses revealed no significant differences in 5-year PFS neither for CIM (76.9% vs 66.7%; p = 0.67) nor for visual PET (85.7% vs 66.7%; p = 0.34) nor for ΔSUVmax (88.9% vs 57.1%; p = 0.12). Conclusions The predictive value of iPET in pediatric patients suffering from NHL was limited due to considerably high amount of false-positive findings, especially in patients suffering from bulky disease. However, due to our limited sample size, final conclusions cannot be drawn and, thus, call for further evaluation of PET in pNHL in larger and more homogenous patient series. PMID:24139528

  11. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  12. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...

  13. The role of the Data and Safety Monitoring Board in a clinical trial: the CRISIS study.

    PubMed

    Holubkov, Richard; Casper, T Charles; Dean, J Michael; Anand, K J S; Zimmerman, Jerry; Meert, Kathleen L; Newth, Christopher J L; Berger, John; Harrison, Rick; Willson, Douglas F; Nicholson, Carol

    2013-05-01

    Randomized clinical trials are commonly overseen by a Data and Safety Monitoring Board comprised of experts in medicine, ethics, and biostatistics. Data and Safety Monitoring Board responsibilities include protocol approval, interim review of study enrollment, protocol compliance, safety, and efficacy data. Data and Safety Monitoring Board decisions can affect study design and conduct, as well as reported findings. Researchers must incorporate Data and Safety Monitoring Board oversight into the design, monitoring, and reporting of randomized trials. Case study, narrative review. The Data and Safety Monitoring Board's role during the comparative pediatric Critical Illness Stress-Induced Immune Suppression (CRISIS) Prevention Trial is described. The National Institutes of Health-appointed CRISIS Data and Safety Monitoring Board was charged with monitoring sample size adequacy and feasibility, safety with respect to adverse events and 28-day mortality, and efficacy with respect to the primary nosocomial infection/sepsis outcome. The Federal Drug Administration also requested Data and Safety Monitoring Board interim review before opening CRISIS to children below 1 yr of age. The first interim analysis found higher 28-day mortality in one treatment arm. The Data and Safety Monitoring Board maintained trial closure to younger children and requested a second interim data review 6 months later. At this second meeting, mortality was no longer of concern, whereas a weak efficacy trend of lower infection/sepsis rates in one study arm emerged. As over 40% of total patients had been enrolled, the Data and Safety Monitoring Board elected to examine conditional power and unmask treatment arm identities. On finding somewhat greater efficacy in the placebo arm, the Data and Safety Monitoring Board recommended stopping CRISIS due to futility. The design and operating procedures of a multicenter randomized trial must consider a pivotal Data and Safety Monitoring Board role. Maximum study design flexibility must be allowed, and investigators must be prepared for protocol modifications due to interim findings. The Data and Safety Monitoring Board must have sufficient clinical and statistical expertise to assess potential importance of interim treatment differences in the setting of multiple looks at accumulating data with numerous outcomes and subgroups.

  14. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...

  15. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...

  16. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  17. Health Effects Assessment for Hexahydro-1,3,5-Trinitro-1,3,5-Triazine (RDX)

    EPA Science Inventory

    The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...

  18. 40 CFR 745.82 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... child-occupied facilities, except for the following: (1) Renovations in target housing or child-occupied...) Renovations in target housing or child-occupied facilities in which a certified renovator, using an EPA... with significant damage. Interim controls performed in response to an elevated blood lead level in a...

  19. CONTROL OF CHELATOR-BASED UPSETS IN SURFACE FINISHING SHOP WASTE WATER TREATMENT SYSTEMS

    EPA Science Inventory

    Actual surface finishing shop examples are used to illustrate the use of process chemistry understanding and analyses to identify immediate, interim and permanent response options for industrial waste water treatment plant (IWTP) upset problems caused by chelating agents. There i...

  20. Refinement of moisture calibration curves for nuclear gage : interim report no. 1.

    DOT National Transportation Integrated Search

    1972-01-01

    This study was initiated to determine the correct moisture calibration curves for different nuclear gages. It was found that the Troxler Model 227 had a linear response between count ratio and moisture content. Also, the two calibration curves for th...

  1. Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments - Interim Final

    EPA Pesticide Factsheets

    This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.

  2. 40 CFR 265.93 - Preparation, evaluation, and response.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... determining: (1) Whether hazardous waste or hazardous waste constituents have entered the ground water; (2... water; and (3) The concentrations of hazardous waste or hazardous waste constituents in the ground water...

  3. 40 CFR 265.93 - Preparation, evaluation, and response.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... determining: (1) Whether hazardous waste or hazardous waste constituents have entered the ground water; (2... water; and (3) The concentrations of hazardous waste or hazardous waste constituents in the ground water...

  4. Developing Guidelines for HIV Antibody Testing among Victims of Pediatric Sexual Abuse.

    ERIC Educational Resources Information Center

    Gellert, George A.; And Others

    1990-01-01

    An interim set of human immunodeficiency virus (HIV) testing guidelines for victims of pediatric sexual abuse (PSA) is proposed. Guidelines are based on responses of 63 practitioners of PSA assessment to 7 hypothetical clinical profiles with 12 testing criteria. (Author/DB)

  5. Occupational exposure limits for nanomaterials: state of the art

    NASA Astrophysics Data System (ADS)

    Schulte, P. A.; Murashov, V.; Zumwalde, R.; Kuempel, E. D.; Geraci, C. L.

    2010-08-01

    Assessing the need for and effectiveness of controlling airborne exposures to engineered nanomaterials in the workplace is difficult in the absence of occupational exposure limits (OELs). At present, there are practically no OELs specific to nanomaterials that have been adopted or promulgated by authoritative standards and guidance organizations. The vast heterogeneity of nanomaterials limits the number of specific OELs that are likely to be developed in the near future, but OELs could be developed more expeditiously for nanomaterials by applying dose-response data generated from animal studies for specific nanoparticles across categories of nanomaterials with similar properties and modes of action. This article reviews the history, context, and approaches for developing OELs for particles in general and nanoparticles in particular. Examples of approaches for developing OELs for titanium dioxide and carbon nanotubes are presented and interim OELs from various organizations for some nanomaterials are discussed. When adequate dose-response data are available in animals or humans, quantitative risk assessment methods can provide estimates of adverse health risk of nanomaterials in workers and, in conjunction with workplace exposure and control data, provide a basis for determining appropriate exposure limits. In the absence of adequate quantitative data, qualitative approaches to hazard assessment, exposure control, and safe work practices are prudent measures to reduce hazards in workers.

  6. Improved survival with vemurafenib in melanoma with BRAF V600E mutation.

    PubMed

    Chapman, Paul B; Hauschild, Axel; Robert, Caroline; Haanen, John B; Ascierto, Paolo; Larkin, James; Dummer, Reinhard; Garbe, Claus; Testori, Alessandro; Maio, Michele; Hogg, David; Lorigan, Paul; Lebbe, Celeste; Jouary, Thomas; Schadendorf, Dirk; Ribas, Antoni; O'Day, Steven J; Sosman, Jeffrey A; Kirkwood, John M; Eggermont, Alexander M M; Dreno, Brigitte; Nolop, Keith; Li, Jiang; Nelson, Betty; Hou, Jeannie; Lee, Richard J; Flaherty, Keith T; McArthur, Grant A

    2011-06-30

    Phase 1 and 2 clinical trials of the BRAF kinase inhibitor vemurafenib (PLX4032) have shown response rates of more than 50% in patients with metastatic melanoma with the BRAF V600E mutation. We conducted a phase 3 randomized clinical trial comparing vemurafenib with dacarbazine in 675 patients with previously untreated, metastatic melanoma with the BRAF V600E mutation. Patients were randomly assigned to receive either vemurafenib (960 mg orally twice daily) or dacarbazine (1000 mg per square meter of body-surface area intravenously every 3 weeks). Coprimary end points were rates of overall and progression-free survival. Secondary end points included the response rate, response duration, and safety. A final analysis was planned after 196 deaths and an interim analysis after 98 deaths. At 6 months, overall survival was 84% (95% confidence interval [CI], 78 to 89) in the vemurafenib group and 64% (95% CI, 56 to 73) in the dacarbazine group. In the interim analysis for overall survival and final analysis for progression-free survival, vemurafenib was associated with a relative reduction of 63% in the risk of death and of 74% in the risk of either death or disease progression, as compared with dacarbazine (P<0.001 for both comparisons). After review of the interim analysis by an independent data and safety monitoring board, crossover from dacarbazine to vemurafenib was recommended. Response rates were 48% for vemurafenib and 5% for dacarbazine. Common adverse events associated with vemurafenib were arthralgia, rash, fatigue, alopecia, keratoacanthoma or squamous-cell carcinoma, photosensitivity, nausea, and diarrhea; 38% of patients required dose modification because of toxic effects. Vemurafenib produced improved rates of overall and progression-free survival in patients with previously untreated melanoma with the BRAF V600E mutation. (Funded by Hoffmann-La Roche; BRIM-3 ClinicalTrials.gov number, NCT01006980.).

  7. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  8. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...

  9. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...

  10. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...

  11. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  12. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  13. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  14. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  15. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  16. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  17. Gas-liquid chromatographic method for determining ethylenethiourea in potatoes, spinach, applesauce, and milk: collaborative study.

    PubMed

    Onley, H H

    1977-09-01

    Eight laboratories collaboratively tested a gas-liquid chromatographic method for determining ethylenetiourea (ETU) in potatoes, spinach, applesauce, and milk. In the determinative step, ETU is converted to the S-butyl derivative (2-n-butylmercapto-2-imidazoline) which is detected by a flame photometric detector, sulfur mode. For unknown fortification levels of 0.06, 0.12, and 0.30 ppm, the collaborators reported an overall average recovery range of 85-97% in the various commodities. The method has been adopted as interim official first action.

  18. Superfund Record of Decision (EPA Region 9): El Toro Marine Corps Air Station, Operable Unit 2A (Site 24-VOC source area vadose zone), El Toro, CA, September 29, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Interim Record of Decision (ROD) presents the selected remedial action for vadose zone soil at Site 24 at Marine Corps Air Station (MCAS) El Toro, located in El Toro, California. The selected remedy for remediation of soil at Site 24 is soil vapor extraction (SVE), the US EPA presumptive remedy for VOC-contaminated soil. The process uses a vacuum to pull VOC-contaminated vapors from the soil through SVE wells.

  19. 12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...

  20. Risk Assessment Approach for the Hanford Site River Corridor Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomson, J.E.; Weiss, S.G.; Sands, J.P.

    2007-07-01

    The river corridor portion of the U.S. Department of Energy's (DOE) Hanford Site includes the 100 Area and 300 Area, which border the Columbia River and cover 565 km{sup 2} (218 mi{sup 2}). The River Corridor Closure (RCC) Project scope of work includes 486 contaminated facilities, 4 of 9 deactivated plutonium production reactors, and 370 waste disposal sites. DOE's cleanup actions in the river corridor were initiated in 1994 under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981 (42 U.S.C. 9601, et seq.) (CERCLA) and included source and groundwater operable units (OUs). DOE's RCC Project, awarded to Washingtonmore » Closure Hanford (WCH) in 2005, focuses on source OUs and has allowed cleanup actions to continue in the 100 and 300 Areas with completion by 2013. The regulatory authorization for cleanup actions at source OUs in the river corridor consists primarily of interim action records of decision (RODs), which were supported by qualitative risk assessments and limited field investigations. A key to establishing final cleanup decisions and proceeding toward final CERCLA closeout is completion of quantitative baseline risk assessment activities. Baseline risk assessment is necessary to determine whether cleanup actions are protective of human health and the environment and to identify any course corrections needed to ensure that current and future cleanup actions are protective. Because cleanup actions are ongoing under interim action RODs, it is desirable to establish the final cleanup decision bases as early as possible to minimize the impacts of any identified course corrections to the cleanup approach. Risk assessment is being performed by WCH as the River Corridor Baseline Risk Assessment (RCBRA). The RCBRA uses a multi-step process that summarizes existing data; uses the data quality objectives process to identify both data gaps and unresolved issues through public workshops; and solicits input from regulators, trustees, and stakeholders. Sampling and analysis plans are then developed to document quality requirements and identify field sample collection approaches. After required data are collected, the risks to human health and the environment are assessed. Sampling of upland, riparian, and near-shore environments for the 100/300 Area Component was performed in 2005 and 2006. The 100/300 Area Component includes former operational/reactor areas. The results of these efforts will be incorporated into a mid-2007 draft risk assessment report for the 100/300 Area Component of the RCBRA. Adapting methodology developed from the 100/300 Area Component, the Inter-Areas risk assessment will be conducted for the riparian and near-shore environments. The Inter-Areas Component includes shoreline areas between former operational areas addressed in the 100/300 Area Component. The Inter-Areas risk assessment will supplement results from the 100/300 Area Component to provide a more complete analysis of residual risks in the river corridor. Plans for the final element of the RCBRA, the Columbia River Component, are being developed by DOE and currently is not part of the RCC Project. The Columbia River Component includes the reach of the Columbia River located adjacent to the Hanford Site and reaches downstream to an undetermined boundary. Recommendations for final cleanup decisions at source units within the river corridor, based in part on the risk assessment results, will be presented for future public review in a River Corridor Source Unit Proposed Plan. To form an integrated cleanup approach for the river corridor, the RCBRA results for the source units require integration with risk assessment results from groundwater cleanup actions managed by other contractors. WCH's risk assessment task includes development of an integration strategy for activities leading up to the final regulatory decisions for all OUs in the river corridor. (authors)« less

  1. Maywood Interim Storage Site: Annual environmental report for calendar year 1990, Maywood, New Jersey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) and surrounding area began in 1984. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The MISS Environmental monitoring programs was established to accommodate facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, extent and use of affected land and water, and localmore » public interest or concern. The environmental monitoring program at MISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium, radium-226, and thorium-232 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards; federal, state, and local applicable or relevant and appropriate requirements (ARARs); and/or DOE derived concentration guidelines (DCGs). Environmental standards, ARARs, and DCGs are established to protect public health and the environment. Results from the 1990 environmental monitoring program show that concentrations of the contaminants of concern were all below applicable standards. Because the site is used only for interim storage and produces no processing effluents, all monitoring, except for radon and direct gamma radiation, was done on a quarterly basis. 18 refs., 17 figs., 28 tabs.« less

  2. Interim Administrators in Higher Education: A National Study

    ERIC Educational Resources Information Center

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  3. 76 FR 72559 - Enhancements to Emergency Preparedness Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... allow the assignment of the on-shift health physics technician (HP Tech.) as the interim operations... public health and safety. These modifications were issued to licensees by NRC Order EA-02-026, ``Order... health and safety through improvements in the response to unlikely initiating events that could lead to...

  4. 76 FR 56409 - Notice of Interim Approval

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... and Comment Forum to be held March 29, 2011, in Tallahassee, Florida. Three parties asked questions at the forum. Responses to the questions are part of the written record of the forum, and a transcript of... each year until 2015. While preference customers throughout the Southeast have long questioned the...

  5. Predictive design procedures, VESYS users manual : an interim design method for flexible pavements using the VESYS structural subsystem

    DOT National Transportation Integrated Search

    1978-01-01

    This manual has been written to provide the pavement manager and design engineer with a ready reference of procedures to predict the structural responses and hence the integrity of flexible pavements. A pavement section of known geometry is chosen, a...

  6. Systematic Method for Establishing Officer Grade Requirements Based Upon Job Demands.

    ERIC Educational Resources Information Center

    Christal, Raymond E.

    This report presents interim results of a study developing a methodology for management engineering teams to determine the appropriate grade requirements for officer positions based on job content and responsibilities. The technology reported represents a modification and extension of methods developed between 1963 and 1966. Results indicated that…

  7. 24 CFR 115.202 - Request for interim certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... housing law. The request shall be supported by the text of the jurisdiction's fair housing law, the law... shall also include organizational information of the agency responsible for administering and enforcing the law. (b) The request and supporting materials shall be filed with the Assistant Secretary for Fair...

  8. Enterprise & Innovation. Teacher Resource Manual. Interim.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Curriculum Branch.

    This teacher resource manual is a support document developed to assist teachers responsible for Enterprise and Innovation courses; it is intended to be used in conjunction with the corresponding program of studies in the curriculum for Alberta, Canada. The manual has been developed to assist classroom teachers by providing the following: (1)…

  9. 78 FR 65221 - Defense Federal Acquisition Regulation Supplement: New Free Trade Agreement-Panama (DFARS Case...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... Supplement (DFARS) to implement the United States--Panama Trade Promotion Agreement. This Trade Promotion...--Panama Trade Promotion Agreement. No respondents submitted public comments in response to the interim... effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs...

  10. Overview of Federal Motor Carrier Safety Administration safety training research for new entrant motor carriers : [research brief].

    DOT National Transportation Integrated Search

    2015-07-01

    In 2002, the Federal Motor Carrier Safety Administration (FMCSA) issued the New Entrant Program Interim Final Rule in response to the requirement in the Motor Carrier Safety Improvement Act of 1999. The requirement in the Act was based on research fi...

  11. 14 CFR 1274.933 - Summary of recipient reporting responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... bar exists, otherwise within 2 years 1274.913 Patent Rights—Retention by the Recipient (Small Business... As required 1274.911 Patent Rights(Paragraph (b)(4)) Interim Report of Reportable Items Every 12 months 1274.912 Patent Rights—Retention by the Recipient (Large Business)(Paragraph (e)(3)(i)) Final...

  12. Longitudinal studies of the 18F-FDG kinetics after ipilimumab treatment in metastatic melanoma patients based on dynamic FDG PET/CT.

    PubMed

    Sachpekidis, Christos; Anwar, Hoda; Winkler, Julia K; Kopp-Schneider, Annette; Larribere, Lionel; Haberkorn, Uwe; Hassel, Jessica C; Dimitrakopoulou-Strauss, Antonia

    2018-06-05

    Immunotherapy has raised the issue of appropriate treatment response evaluation, due to the unique mechanism of action of the immunotherapeutic agents. Aim of this analysis is to evaluate the potential role of quantitative analysis of 2-deoxy-2-( 18 F)fluoro-D-glucose ( 18 F-FDG) positron emission tomography/computed tomography (PET/CT) data in monitoring of patients with metastatic melanoma undergoing ipilimumab therapy. 25 patients with unresectable metastatic melanoma underwent dynamic PET/CT (dPET/CT) of the thorax and upper abdomen as well as static, whole body PET/CT with 18 F-FDG before the start of ipilimumab treatment (baseline PET/CT), after two cycles of treatment (interim PET/CT) and at the end of treatment after four cycles (late PET/CT). The evaluation of dPET/CT studies was based on semi-quantitative (standardized uptake value, SUV) calculation as well as quantitative analysis, based on two-tissue compartment modeling and a fractal approach. Patients' best clinical response, assessed at a mean of 59 weeks, was used as reference. According to their best clinical response, patients were dichotomized in those demonstrating clinical benefit (CB, n = 16 patients) and those demonstrating no clinical benefit (no-CB, n = 9 patients). No statistically significant differences were observed between CB and no-CB regarding either semi-quantitative or quantitative parameters in all scans. On contrary, the application of the recently introduced PET response evaluation criteria for immunotherapy (PERCIMT) led to a correct classification rate of 84% (21/25 patients). Quantitative analysis of 18 F-FDG PET data does not provide additional information in treatment response evaluation of metastatic melanoma patients receiving ipilimumab. PERCIMT criteria correlated better with clinical response.

  13. Maywood Interim Storage Site environmental report for calendar year 1992, 100 West Hunter Avenue, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Maywood Interim Storage Site (MISS) and provides the results for 1992. Environmental monitoring of MISS began in 1984, when the site was assigned to DOE by Congress through the Energy and Water Development Appropriations Act and was placed under DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. MISS is part of amore » National Priorities List (NPL) site. The environmental surveillance program at MISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analysis includes metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling the DOE objective of measuring and monitoring effluents from DOE activities and calculating hypothetical doses to members of the general public. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Environmental standards are established to protect public health and the environment. The radiological data for all media sampled support the conclusion that doses to the public are not distinguishable from natural background radiation.« less

  14. Where We Stand—CMA Position Papers: • Abortion • Acupuncture • Chiropractic • Confidentiality • Cost of Care • Drug Abuse • Environmental Health • Health Education for the Public • Health in the United States • Health Quackery • Health Maintenance Organizations and Prepaid Health Plans • Health Manpower • National Health Insurance • Physician's Assistants • Physician Unions • Professional Standards Review Organizations • Quality Medical Care

    PubMed Central

    1973-01-01

    To serve the interests of members and to function in the public interest, the California Medical Association must set policies and take positions on current issues affecting the health care of Californians. These policies then guide the activities of the Association in fulfilling its leadership role and its responsibility to the public. Delegates, elected by the membership of CMA's component medical societies, meet annually to deliberate and determine the policies and courses of action for the Association. Between meetings of these Delegates, the CMA Councilors, elected by their district membership, implement the directives of the Delegates and set interim policies. By this democratic process, the membership governs the CMA. Association members must be informed if they are to participate effectively in the affairs of their medical organizations. To disseminate better understanding of CMA's activities, position papers on current issues have been developed. They are based on House of Delegates resolutions and Council actions. Entitled “Where We Stand on Medical and Health Issues,” these papers represent the current policy positions of CMA. Each paper is annotated to give the reference source of the policy actions. As with any organization, CMA policies are subject to timely revision. When policies are amended or new policies are adopted, new papers will be developed. PMID:4148533

  15. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 2. GSFLS visit findings and evaluations. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1978-01-31

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This report describes a global framework that evaluates spent fuel disposition requirements, influencing factors and strategies. A broad sampling of foreign governmental officials, electric utility spokesmen and nuclear power industry officials responsible for GSFLS policies, plans and programs were surveyed as to their views with respect to national and international GSFLS related considerations. The results of these GSFLS visit findings are presented herein. These findings were then evaluated in terms of technical, institutional and legal/regulatory implications. The GSFLS evaluations, in conjunctionmore » with perceived US spent fuel objectives, formed the basis for selecting a set of GSFLS strategies which are reported herein.« less

  16. Analysis of Commercially Available Firefighting Helmet and Boot Options for the Joint Firefighter Integrated Response Ensemble (JFIRE)

    DTIC Science & Technology

    2012-02-01

    AFRL-RX-TY-TR-2012-0022 ANALYSIS OF COMMERCIALLY AVAILABLE HELMET AND BOOT OPTIONS FOR THE JOINT FIREFIGHTER INTEGRATED RESPONSE ENSEMBLE...Interim Technical Report 01-SEP-2010 -- 31-JAN-2011 Analysis of Commercially Available Firefighting Helmet and Boot Options for the Joint Firefighter...ensemble. A requirements correlation matrix was generated and sent to industry detailing objective and threshold measurements for both the helmet

  17. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...

  18. 78 FR 44523 - Burned Area Emergency Response, Forest Service

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ..., Fish, Wildlife, Air and Rare Plants, Mail Stop 1121, 1400 Independence Ave. SW., Washington, DC 20250... interim directive may do so in the Office of the Director, Watershed, Fish, Wildlife, Air and Rare Plants..., Fish Wildlife, Air and Rare Plants Staff, 333 Broadway SE., Albuquerque, NM 87102, 505-842-3141 or...

  19. Evaluation of the HOPE Act: New State Services for Street Youth. Interim Report.

    ERIC Educational Resources Information Center

    McLain, Barbara

    This report reviews the effectiveness of Washington's HOPE Centers and Responsible Living Skills Programs (RLSPs) and reports findings and recommendations. In 1999, state legislators enacted the HOPE Act, which created these two services. HOPE Centers are temporary residential facilities where street youth can stay for 30 days while being…

  20. Working Parents Project (WPP). Final Interim Report.

    ERIC Educational Resources Information Center

    Mason, Theresa; Espinoza, Renato

    Results are reported from a 2-year study designed to explore how the nature of women's jobs, as viewed by women and their husbands, influences the system of nuclear family relationships and affects parents' involvement with their children's schools. The research has evolved into a comparative exploratory study of the responses of 30 families to…

  1. 45 CFR 86.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Equipment, 86.41(c) Expenditures, 86.41(c) Facilities, 86.41(c) Travel, 86.41(c) Scholarships, [64, 65]; 86...-time employees, [89] G Grievance Procedure, see “Designation of responsible employee”, 86.8(a) (b) H... Undergraduate Professional Schools, [30]; 86.15(d) Purpose of Regulation, [13]; 86.1 R Real Property, 86.2(g...

  2. 76 FR 68026 - Federal Acquisition Regulation; Small Disadvantaged Business Self-Certification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... Business Administration (SBA) to its small disadvantaged business (SDB) program. DATES: Effective Date... disadvantaged businesses (SDBs) to self-represent their SDB status to prime contractors in good faith when... certified by the SBA as SDB firms. DoD, GSA, and NASA received no comments in response to the interim rule...

  3. Assessment of Methane and VOC Emissions from Select Upstream Oil and Gas Production Operations Using Remote Measurements, Interim Report on Recent Survey Studies

    EPA Science Inventory

    This product is visuals for a platform presentation in support of already approved extended abstact for thisconference. Abstract: Environmentally responsible development of oil and gas assets in the United States is facilitated by advancement of sector-specific air pollution em...

  4. Home Start Evaluation Study. Interim Case Studies IIa.

    ERIC Educational Resources Information Center

    Fein, Robert

    This formative evaluation study of Home Start uses a case study approach. A brief case study focuses on the administrative structure and staff resources and responsibilities of National Home Start. Also included are reports on seven local programs developed after two field visits had been made to each program. In the first visit, objectives chosen…

  5. Federal Manpower Legislation and the Academic Health Centers: An Interim Report.

    ERIC Educational Resources Information Center

    Carter, Grace M.; And Others

    Health Manpower Legislation and related research aspects are the topics of this report. The program of the Comprehensive Health Manpower Training Act of 1971 played a major role in the medical school enrollment expansion that occurred between 1971 and 1973. Medical school admissions decisions have been responsible to federal policy objectives and…

  6. Field instrumentation and measured response of the I-295 cable-stayed bridge : interim report on construction measurements in deck segments.

    DOT National Transportation Integrated Search

    1991-01-01

    During the construction of the I-295 cable-stayed bridge, an extensive array of mechanical strain gage points were installed in sections of the box girders, pylons, and piers. At each instrumented box girder section, five longitudinal gages were plac...

  7. 78 FR 28198 - Interim Procedures for Considering Requests Under the Commercial Availability Provision of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ..., Response, Rebuttal, and Request to Remove or Restrict) must be in English. If any attachments are in a language other than English, then a complete translation must be provided. Each submission must be... that lacks the applicable certifications will be considered an incomplete submission that CITA will...

  8. Health care fraud and abuse data collection program: technical revisions to healthcare integrity and protection data bank data collection activities. Interim final rule with comment period.

    PubMed

    2004-06-17

    The rule makes technical changes to the Healthcare Integrity and Protection Data Bank (HIPDB) data collection reporting requirements set forth in 45 CFR part 61 by clarifying the types of personal numeric identifiers that may be reported to the data bank in connection with adverse actions. Specifically, the rule clarifies that in lieu of a Social Security Number (SSN), an individual taxpayer identification number (ITIN) may be reported to the data bank when, in those limited situations, an individual does not have an SSN.

  9. 78 FR 26117 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ...Through this interim final rule, NMFS announces that it partially approves Framework Adjustment 48 to the NE Multispecies Fishery Management Plan (FMP) and implements the approved measures in the regulations. Framework 48 is the first of two parallel and related actions developed by the New England Fishery Management Council (Council) to respond to updated stock status information and to adjust other management measures in the NE multispecies (groundfish) fishery beginning in fishing year (FY) 2013. This action implements new status determination criteria for Gulf of Maine (GOM) cod, Georges Bank (GB) cod, Southern New England/Mid-Atlantic (SNE/MA) yellowtail flounder, and white hake based on new benchmark assessments completed for these stocks in 2012 and 2013. NMFS is approving and implementing updated status determination criteria for white hake through this interim final rule and accepting further comment on this measure since it was not available for comment in the Framework 48 proposed rule. NMFS will publish a subsequent final rule to respond to any comments received, if necessary. Through this action, NMFS has also approved and is implementing the following Framework 48 measures: Elimination of dockside monitoring requirements for the groundfish fishery; lower minimum fish sizes for several groundfish stocks; clarified goals and performance standard for groundfish monitoring programs; revisions to the allocation of GB yellowtail flounder to the scallop fishery; and establishment of sub-annual catch limits (ACLs) of GB yellowtail flounder and SNE/MA windowpane flounder for the scallop and other non- groundfish fisheries. NMFS also approved revisions to recreational and commercial accountability measures (AMs), including amendments to existing AMs for windowpane flounder, ocean pout, and Atlantic halibut, and new ``reactive'' AMs for Atlantic wolffish and SNE/MA winter flounder, to address a remand by the U.S. District Court of Appeals. NMFS disapproved some measures in Framework 48: A provision for cost- sharing of monitoring costs between the industry and NMFS; a provision to delay industry-funded monitoring to FY 2014; finer scale discard rate strata for GB yellowtail flounder; and a provision to remove requirements for groundfish trawlers to stow their gear when transiting closed areas. Through this interim final rule, NMFS also withdraws a proposed correction to the regulations specific to monitoring of the Eastern U.S./Canada quotas, and will be accepting additional public comment on this issue. These measures are necessary to meet the requirements of the FMP and the Magnuson-Stevens Act, most notably preventing overfishing, ensuring that management measures are based on the best available science, and mitigating, to the extent practicable, potential negative economic impacts from reductions in catch limits anticipated for fishing year FY 2013.

  10. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    PubMed

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  11. Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1,more » data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.« less

  12. MO-F-CAMPUS-I-05: Quantitative ADC Measurement of Esophageal Cancer Before and After Chemoradiation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, L; UT MD Anderson Cancer Center, Houston, TX; Son, JB

    2015-06-15

    Purpose: We investigated whether quantitative diffusion imaging can be used as an imaging biomarker for early prediction of treatment response of esophageal cancer. Methods: Eight patients with esophageal cancer underwent a baseline and an interim MRI studies during chemoradiation on a 3T whole body MRI scanner with an 8-channel torso phased array coil. Each MRI study contained two axial diffusion-weighted imaging (DWI) series with a conventional DWI sequence and a reduced field-of-view DWI sequence (FOCUS) of varying b-values. ADC maps with two b-values were computed from conventional DWI images using a mono-exponential model. For each of DWI sequences, separate ADCallmore » was computed by fitting the signal intensity of images with all the b-values to a single exponential model. For the FOCUS sequence, a bi-exponential model was used to extract perfusion and diffusion coefficients (ADCperf and ADCdiff) and their contributions to the signal decay. A board-certified radiologist contoured the tumor region and mean ADC values and standard deviations of tumor and muscle ROIs were recorded from different ADC maps. Results: Our results showed that (1) the magnitude of ADCs from the same ROIs by the different analysis methods can be substantially different. (2) For a given method, the change between the baseline and interim muscle ADCs was relatively small (≤10%). In contrast, the change between the baseline and interim tumor ADCs was substantially larger, with the change in ADCdiff by FOCUS DWI showing the largest percentage change of 73.2%. (3) The range of the relative change of a specific parameter for different patients was also different. Conclusion: Presently, we do not have the final pathological confirmation of the treatment response for all the patients. However, for a few patients whose surgical specimen is available, the quantitative ADC changes have been found to be useful as a potential predictor for treatment response.« less

  13. Effects of an Advocacy Trial on Food Industry Salt Reduction Efforts—An Interim Process Evaluation

    PubMed Central

    Trevena, Helen; Petersen, Kristina; Thow, Anne Marie; Neal, Bruce

    2017-01-01

    The decisions made by food companies are a potent factor shaping the nutritional quality of the food supply. A number of non-governmental organizations (NGOs) advocate for corporate action to reduce salt levels in foods, but few data define the effectiveness of advocacy. This present report describes the process evaluation of an advocacy intervention delivered by one Australian NGO directly to food companies to reduce the salt content of processed foods. Food companies were randomly assigned to intervention (n = 22) or control (n = 23) groups. Intervention group companies were exposed to pre-planned and opportunistic communications, and control companies to background activities. Seven pre-defined interim outcome measures provided an indication of the effect of the intervention and were assessed using intention-to-treat analysis. These were supplemented by qualitative data from nine semi-structured interviews. The mean number of public communications supporting healthy food made by intervention companies was 1.5 versus 1.8 for control companies (p = 0.63). Other outcomes, including the mean number of news articles, comments and reports (1.2 vs. 1.4; p = 0.72), a published nutrition policy (23% vs. 44%; p = 0.21), public commitment to the Australian government’s Food and Health Dialogue (FHD) (41% vs. 61%; p = 0.24), evidence of a salt reduction plan (23% vs. 30%; p = 0.56), and mean number of communications with the NGO (15 vs. 11; p = 0.28) were also not significantly different. Qualitative data indicated the advocacy trial had little effect. The absence of detectable effects of the advocacy intervention on the interim markers indicates there may be no impact of the NGO advocacy trial on the primary outcome of salt reduction in processed foods. PMID:29039802

  14. Effects of an Advocacy Trial on Food Industry Salt Reduction Efforts-An Interim Process Evaluation.

    PubMed

    Trevena, Helen; Petersen, Kristina; Thow, Anne Marie; Dunford, Elizabeth K; Wu, Jason H Y; Neal, Bruce

    2017-10-17

    The decisions made by food companies are a potent factor shaping the nutritional quality of the food supply. A number of non-governmental organizations (NGOs) advocate for corporate action to reduce salt levels in foods, but few data define the effectiveness of advocacy. This present report describes the process evaluation of an advocacy intervention delivered by one Australian NGO directly to food companies to reduce the salt content of processed foods. Food companies were randomly assigned to intervention ( n = 22) or control ( n = 23) groups. Intervention group companies were exposed to pre-planned and opportunistic communications, and control companies to background activities. Seven pre-defined interim outcome measures provided an indication of the effect of the intervention and were assessed using intention-to-treat analysis. These were supplemented by qualitative data from nine semi-structured interviews. The mean number of public communications supporting healthy food made by intervention companies was 1.5 versus 1.8 for control companies ( p = 0.63). Other outcomes, including the mean number of news articles, comments and reports (1.2 vs. 1.4; p = 0.72), a published nutrition policy (23% vs. 44%; p = 0.21), public commitment to the Australian government's Food and Health Dialogue (FHD) (41% vs. 61%; p = 0.24), evidence of a salt reduction plan (23% vs. 30%; p = 0.56), and mean number of communications with the NGO (15 vs. 11; p = 0.28) were also not significantly different. Qualitative data indicated the advocacy trial had little effect. The absence of detectable effects of the advocacy intervention on the interim markers indicates there may be no impact of the NGO advocacy trial on the primary outcome of salt reduction in processed foods.

  15. Autoregressive Processes in Homogenization of GNSS Tropospheric Data

    NASA Astrophysics Data System (ADS)

    Klos, A.; Bogusz, J.; Teferle, F. N.; Bock, O.; Pottiaux, E.; Van Malderen, R.

    2016-12-01

    Offsets due to changes in hardware equipment or any other artificial event are all a subject of a task of homogenization of tropospheric data estimated within a processing of Global Navigation Satellite System (GNSS) observables. This task is aimed at identifying exact epochs of offsets and estimate their magnitudes since they may artificially under- or over-estimate trend and its uncertainty delivered from tropospheric data and used in climate studies. In this research, we analysed a common data set of differences of Integrated Water Vapour (IWV) from GPS and ERA-Interim (1995-2010) provided for a homogenization group working within ES1206 COST Action GNSS4SWEC. We analysed daily IWV records of GPS and ERA-Interim in terms of trend, seasonal terms and noise model with Maximum Likelihood Estimation in Hector software. We found that this data has a character of autoregressive process (AR). Basing on this analysis, we performed Monte Carlo simulations of 25 years long data with two different noise types: white as well as combination of white and autoregressive and also added few strictly defined offsets. This synthetic data set of exactly the same character as IWV from GPS and ERA-Interim was then subjected to a task of manual and automatic/statistical homogenization. We made blind tests and detected possible epochs of offsets manually. We found that simulated offsets were easily detected in series with white noise, no influence of seasonal signal was noticed. The autoregressive series were much more problematic when offsets had to be determined. We found few epochs, for which no offset was simulated. This was mainly due to strong autocorrelation of data, which brings an artificial trend within. Due to regime-like behaviour of AR it is difficult for statistical methods to properly detect epochs of offsets, which was previously reported by climatologists.

  16. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma: interpretation criteria and concordance rate among reviewers.

    PubMed

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F

    2013-05-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.

  17. Publishing interim results of randomised clinical trials in peer-reviewed journals.

    PubMed

    Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan

    2017-02-01

    Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.

  18. Variations in the temperature and circulation of the atmosphere during the 11-year cycle of solar activity derived from the ERA-Interim reanalysis data

    NASA Astrophysics Data System (ADS)

    Gruzdev, A. N.

    2017-07-01

    Using the data of the ERA-Interim reanalysis, we have obtained estimates of changes in temperature, the geopotential and its large-scale zonal harmonics, wind velocity, and potential vorticity in the troposphere and stratosphere of the Northern and Southern hemispheres during the 11-year solar cycle. The estimates have been obtained using the method of multiple linear regression. Specific features of response of the indicated atmospheric parameters to the solar cycle have been revealed in particular regions of the atmosphere for a whole year and depending on the season. The results of the analysis indicate the existence of a reliable statistical relationship of large-scale dynamic and thermodynamic processes in the troposphere and stratosphere with the 11-year solar cycle.

  19. The potential of air-sea interactions for improving summertime North Atlantic seasonal forecasts

    NASA Astrophysics Data System (ADS)

    Ossó, Albert; Shaffrey, Len; Dong, Buwen; Sutton, Rowan

    2017-04-01

    Delivering skillful summertime seasonal forecasts of the Northern Hemisphere (NH) mid-latitude climate is a key unresolved issue for the climate science community. Current climate models have some skill in forecasting the wintertime NH mid-latitude circulation but very limited skill during summertime. To explore the potential predictability of the summertime climate we analyze lagged correlation patterns between the SSTs and summer atmospheric circulation in the North Atlantic both in observations and climate model outputs. We find observational evidence in the ERA-Interim (1979-2015) reanalysis and the HadSLP2 and HadISST data of an SST pattern forced by late winter atmospheric circulation persisting from winter to early summer that excites an anticyclonic summer SLP anomaly west of the British Isles. We show that the atmospheric response is driven through the action of turbulent heat fluxes and changes on the background baroclinicity. The lagged atmospheric response to the SSTs could be exploited for summertime predictability over Western Europe. We find a statistical significant correlation of over 0.6 between April-May North Atlantic SSTs and the June-August North Atlantic SLP anomaly. The previous findings are further explored using 120 years of coupled ocean-atmosphere HadGEM3-GC2 model simulation. The climate model qualitatively reproduces the observed spatial relationship between the late winter and spring SSTs and summertime circulation, although the correlations are substantially weaker than observed.

  20. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  1. Record of decision, Bomarc Missile Accident Site, Mcguire AFB, New Jersey. Final report, November 1989-May 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, G.

    1992-11-20

    This document presents the selected final remedial action for the radioactive wastes at the BOMARC Missile Site, McGuire Air Force Base, New Jersey. The BOMARC Missile Site became contaminated in 1960 as the result of a fire which partially consumed a nuclear warhead-equipped BOMARC missile. The Air Force has decided to pursue excavation and Off-site Disposal of contaminated waste at a Department of Energy (DOE) disposal facility. This is a cost effective, permanent remedy, and is the environmentally preferred alternative. However, should the Air Force be denied the use of a DOE facility, or if other events should dramatically decreasemore » the cost effectiveness of this remedy, then as an interim remedy, the Air Force will maintain the BOMARC Missile Site in accordance with the NEPA No Action Alternative.« less

  2. Supporting evaluation for the proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less

  3. Enhancement of cooperation in the spatial prisoner's dilemma with a coherence-resonance effect through annealed randomness at a cooperator-defector boundary; comparison of two variant models

    NASA Astrophysics Data System (ADS)

    Tanimoto, Jun

    2016-11-01

    Inspired by the commonly observed real-world fact that people tend to behave in a somewhat random manner after facing interim equilibrium to break a stalemate situation whilst seeking a higher output, we established two models of the spatial prisoner's dilemma. One presumes that an agent commits action errors, while the other assumes that an agent refers to a payoff matrix with an added random noise instead of an original payoff matrix. A numerical simulation revealed that mechanisms based on the annealing of randomness due to either the action error or the payoff noise could significantly enhance the cooperation fraction. In this study, we explain the detailed enhancement mechanism behind the two models by referring to the concepts that we previously presented with respect to evolutionary dynamic processes under the names of enduring and expanding periods.

  4. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  5. Interim analyses in 2 x 2 crossover trials.

    PubMed

    Cook, R J

    1995-09-01

    A method is presented for performing interim analyses in long term 2 x 2 crossover trials with serial patient entry. The analyses are based on a linear statistic that combines data from individuals observed for one treatment period with data from individuals observed for both periods. The coefficients in this linear combination can be chosen quite arbitrarily, but we focus on variance-based weights to maximize power for tests regarding direct treatment effects. The type I error rate of this procedure is controlled by utilizing the joint distribution of the linear statistics over analysis stages. Methods for performing power and sample size calculations are indicated. A two-stage sequential design involving simultaneous patient entry and a single between-period interim analysis is considered in detail. The power and average number of measurements required for this design are compared to those of the usual crossover trial. The results indicate that, while there is minimal loss in power relative to the usual crossover design in the absence of differential carry-over effects, the proposed design can have substantially greater power when differential carry-over effects are present. The two-stage crossover design can also lead to more economical studies in terms of the expected number of measurements required, due to the potential for early stopping. Attention is directed toward normally distributed responses.

  6. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  7. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  8. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  9. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  10. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  11. 76 FR 4369 - Special Law Enforcement Commissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY... of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the...

  12. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  13. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  14. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  15. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  16. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  17. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  18. US Intergroup Trial of Response-Adapted Therapy for Stage III to IV Hodgkin Lymphoma Using Early Interim Fluorodeoxyglucose–Positron Emission Tomography Imaging: Southwest Oncology Group S0816

    PubMed Central

    Li, Hongli; Schöder, Heiko; Straus, David J.; Moskowitz, Craig H.; LeBlanc, Michael; Rimsza, Lisa M.; Bartlett, Nancy L.; Evens, Andrew M.; Mittra, Erik S.; LaCasce, Ann S.; Sweetenham, John W.; Barr, Paul M.; Fanale, Michelle A.; Knopp, Michael V.; Noy, Ariela; Hsi, Eric D.; Cook, James R.; Lechowicz, Mary Jo; Gascoyne, Randy D.; Leonard, John P.; Kahl, Brad S.; Cheson, Bruce D.; Fisher, Richard I.; Friedberg, Jonathan W.

    2016-01-01

    Purpose Four US National Clinical Trials Network components (Southwest Oncology Group, Cancer and Leukemia Group B/Alliance, Eastern Cooperative Oncology Group, and the AIDS Malignancy Consortium) conducted a phase II Intergroup clinical trial that used early interim fluorodeoxyglucose positron emission tomography (FDG-PET) imaging to determine the utility of response-adapted therapy for stage III to IV classic Hodgkin lymphoma. Patients and Methods The Southwest Oncology Group S0816 (Fludeoxyglucose F 18-PET/CT Imaging and Combination Chemotherapy With or Without Additional Chemotherapy and G-CSF in Treating Patients With Stage III or Stage IV Hodgkin Lymphoma) trial enrolled 358 HIV-negative patients between July 1, 2009, and December 2, 2012. A PET scan was performed after two initial cycles of doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) and was labeled PET2. PET2-negative patients (Deauville score 1 to 3) received an additional four cycles of ABVD, whereas PET2-positive patients (Deauville score 4 to 5) were switched to escalated bleomycin, etoposide, doxorubicin, cyclophosphamide, vincristine, procarbazine, and prednisone (eBEACOPP) for six cycles. Among 336 eligible and evaluable patients, the median age was 32 years (range, 18 to 60 years), with 52% stage III, 48% stage IV, 49% International Prognostic Score 0 to 2, and 51% score 3 to 7. Results Three hundred thirty-six of the enrolled patients were evaluable. Central review of the interim PET2 scan was performed in 331 evaluable patients, with 271 (82%) PET2-negative and 60 (18%) PET2-positive. Of 60 eligible PET2-positive patients, 49 switched to eBEACOPP as planned and 11 declined. With a median follow-up of 39.7 months, the Kaplan-Meier estimate for 2-year overall survival was 98% (95% CI, 95% to 99%), and the 2-year estimate for progression-free survival (PFS) was 79% (95% CI, 74% to 83%). The 2-year estimate for PFS in the subset of patients who were PET2-positive after two cycles of ABVD was 64% (95% CI, 50% to 75%). Both nonhematologic and hematologic toxicities were greater in the eBEACOPP arm than in the continued ABVD arm. Conclusion Response-adapted therapy based on interim PET imaging after two cycles of ABVD seems promising with a 2-year PFS of 64% for PET2-positive patients, which is much higher than the expected 2-year PFS of 15% to 30%. PMID:27069074

  19. A systematic review of the reporting of Data Monitoring Committees' roles, interim analysis and early termination in pediatric clinical trials

    PubMed Central

    2009-01-01

    Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383

  20. Colonie Interim Storage Site annual environmental report for calendar year 1991, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Colonie Interim Storage Site (CISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring at CISS began in 1984 when Congress added the site to the US Department of Energy`s Formerly Utilized Sites Remedial Action Program. CISS property and surrounding areas were radioactively contaminated by operations conducted by National Lead Industries, which manufactured various components from uranium and thorium from 1958 to 1984. The environmental monitoring program at CISS includes sampling networks for external gamma radiation exposure and for radium-226, thorium-232, and total uranium concentrations inmore » surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. In 1992 the program will also include sampling networks for radioactive and chemical contaminants in stormwater to meet permit application requirements under the Clean Water Act. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE.orders. Environmental standards are established to protect public health and the environment. Results of environmental monitoring during 1991 indicate that average concentrations of radioactive contaminants of concern were well below applicable standards and DCGS. Concentrations of some chemical contaminants in groundwater were above-the New York State Department of Environmental Conservation (Class GA) and EPA guidelines for drinking water. The potential annual radiation exposure (excluding background) calculated for a hypothetical maximally exposed individual is 0.23 mrem (milliroentgen equivalent man), which is less than an individual would receive while traveling in an airplane at 12,000 meters (39,000 feet) for one hour.« less

  1. Content Assessment Aligned to the Common Core State Standards: Improving Validity and Fairness for English Language Learners

    ERIC Educational Resources Information Center

    Chia, Magda Y.

    2014-01-01

    The Smarter Balanced Assessment Consortium (Smarter Balanced) serves over 19 million primary, middle, and high school students from across 26 states and affiliates (Smarter Balanced, n.d). As one of the two Race to the Top (RTT)-funded assessment consortia, Smarter Balanced is responsible for developing formative, interim, and summative…

  2. From Teacher to Day Care Center Director!

    ERIC Educational Resources Information Center

    De Viteri, Jorge Saenz

    This paper addresses the roles and responsibilities of a day care center director, based on the author's personal experience as an interim director during his junior year at college and a survey of other directors. The paper aims to provide insight into the reality of being a day care center director, particularly the acquisition of knowledge,…

  3. Assessment of Methane and VOC Emissions on Select Upstream Oil and Gas Production Operations Using Remote Measurements, Interim Report on Recent Survey Studies

    EPA Science Inventory

    Environmentally responsible development of oil and gas assets in the United States is facilitated by advancement of sector-specific air pollution emission measurement and modeling tools. Emissions from upstream oil and gas production are complex in nature due to the variety of e...

  4. Juvenile Residential Facility Census, 2010: Selected Findings. Juvenile Offenders and Victims: National Report Series. Bulletin NCJ 241134

    ERIC Educational Resources Information Center

    Hockenberry, Sarah; Sickmund, Melissa; Sladky, Anthony

    2013-01-01

    This bulletin is part of the "Juvenile Offenders and Victims National Report Series." The "National Report" offers a comprehensive statistical overview of the problems of juvenile crime, violence, and victimization and the response of the juvenile justice system. During each interim year, the bulletins in the "National…

  5. Field instrumentation and measured response of the I-295 cable-stayed bridge : interim report on construction period strains in cable stays.

    DOT National Transportation Integrated Search

    1991-01-01

    During the construction of the I-295 cable-stayed bridge, a number of the stays on the main span cantilever were instrumented with electrical resistance strain gages mounted directly on the wires of the seven-wire strands making up the stay cables. M...

  6. Regulation of Standardized Testing in Kentucky. Research Report No. 209.

    ERIC Educational Resources Information Center

    Kentucky State General Assembly, Frankfort. Legislative Research Commission.

    The Subcommittee on Truth in Testing of the Interim Joint Committee on Education was formed in response to Senate Resolution 43 of the 1982 Kentucky General Assembly. Its task was to study the questions regarding the effectiveness and equity of standardized testing, which has become an important part of the academic experience of public school…

  7. 76 FR 24816 - Government Employees Serving in Official Capacity in Nonprofit Organizations; Sector Unit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ... pursuant to section 208(a). On August 28, 1995, the Office of Government Ethics published its first interim... nonprofit organization, it can be very difficult for the employee to avoid the mistaken impression that he... before Congress first. No legislative changes to section 208 were enacted in response to the report...

  8. Response Surface Analysis. National Consortium for Humanizing Education, Interim Report No. 3.

    ERIC Educational Resources Information Center

    Roebuck, Flora N.; Aspy, D. N.

    One of the major studies conducted by the Consortium involved examining the inter-relationships of various aspects of teacher and student classroom functioning to determine what happens to a particular class of teacher or student behavior as the quantity and/or quality of other aspects of classroom interaction change. This examination occurred in…

  9. 78 FR 37698 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-67; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ............ Contracting with 2013-010 Morgan. Women-owned Small Business Concerns (Interim). VIII Deletion of Report 2013... panel, consists of senior-level DoD officials from across DoD working to review progress made by DoD to... ensure that CORs understand their duties and responsibilities to survey contractor performance. This...

  10. Educational Information System for Ontario. Second Interim Report, March 1976-February 1977.

    ERIC Educational Resources Information Center

    Auster, Ethel; Lawton, Stephen B.

    This report of the EISO project, the responsibility of which is the operation of an online bibliographic search service for educators of Ontario, concentrates on research findings collected after EISO had been operational for 16 months. The organization, role, and level of satisfaction of EISO users are treated, the system's impact on a school…

  11. 42 CFR 417.574 - Interim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...

  12. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  13. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  14. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  15. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  16. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  17. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  18. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...

  19. EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.

  20. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  1. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...

  2. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  3. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  4. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  5. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  6. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  7. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  8. An interim prosthesis program for lower limb amputees: comparison of public and private models of service.

    PubMed

    Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn

    2010-06-01

    This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.

  9. 24 CFR 115.207 - Consequences of interim certification and certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...

  10. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  11. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  12. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  13. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  14. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  15. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...

  16. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  17. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  18. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  19. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  20. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  1. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  2. 76 FR 37781 - Foreign-Trade Zone 26; Atlanta, GA; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...

  3. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  4. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  5. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...

  6. 17 CFR 210.10-01 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...

  7. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...

  8. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...

  9. Staff Reactions to Interim Leadership in a Student Affairs Organization

    ERIC Educational Resources Information Center

    Jones, Robin D.

    2011-01-01

    Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…

  10. Faculty and Student Views of the Interim Term

    ERIC Educational Resources Information Center

    Centra, John A.; Sobol, Marion G.

    1974-01-01

    Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)

  11. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  12. Into the Sunset: Reflections of an Interim Administrator.

    ERIC Educational Resources Information Center

    Marlowe, John

    2000-01-01

    One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)

  13. PCoD Lite - Using an Interim PCoD Protocol to Assess the Effects of Disturbance Associated with US Navy Exercises on Marine Mammal Populations

    DTIC Science & Technology

    2015-09-30

    1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on

  14. Petition to request an exemption from 100 percent identity testing of dietary ingredients: Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements. Interim final rule.

    PubMed

    2007-06-25

    The Food and Drug Administration (FDA) is issuing an interim final rule (IFR) that sets forth a procedure for requesting an exemption from the requirement in the final rule "Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements," published elsewhere in this issue of the Federal Register, that the manufacturer conduct at least one appropriate test or examination to verify the identity of any component that is a dietary ingredient. This IFR allows for submission to, and review by, FDA of an alternative to the required 100 percent identity testing of components that are dietary ingredients, provided certain conditions are met and establishes a requirement for retention of records relating to the FDA's response to an exemption request.

  15. A nurse led model of chronic disease care - an interim report.

    PubMed

    Eley, Diann S; Del Mar, Chris B; Patterson, Elizabeth; Synnott, Robyn L; Baker, Peter G; Hegney, Desley

    2008-12-01

    Chronic condition management in general practice is projected to account for 50% of all consultations by 2051. General practices under present workforce conditions will be unable to meet this demand. Nurse led collaborative care models of chronic disease management have been successful overseas and are proposed as one solution. This article provides an interim report on a prospective randomised trial to investigate the acceptability, cost effectiveness and feasibility of a nurse led model of care for chronic conditions in Australian general practice. A qualitative study focused on the impact of this model of care through the perceptions of practice staff from one urban and one regional practice in Queensland, and one Victorian rural practice. Primary benefits of the collaborative care model focused on increased efficiency and communication between practice staff and patients. The increased degree of patient self responsibility was noted by all and highlights the motivational aspect of chronic disease management.

  16. Interim evaluation of the Tier 1 Program of Project P.A.T.H.S.: continuation of evidence.

    PubMed

    Shek, Daniel T L; Yu, Lu; Chan, Alex C W

    2012-01-17

    An interim evaluation study was conducted to understand the implementation of the Tier 1 Program of Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes) in the 2008/09 school year. One hundred and twenty-eight schools were randomly selected to provide information on the implementation details of the program via interviews, telephone interviews and self-completed questionnaires. Results showed that a majority of the workers perceived that the students had positive responses to the program and the program was helpful to the students. Program workers' views toward the implementation of the Tier 1 Program were positive across different grades and program implementation modes. In conjunction with previous studies, the present findings suggest that the Tier 1 Program of Project P.A.T.H.S. is well received by different stakeholders.

  17. Retail sales of scheduled listed chemical products; self-certification of regulated sellers of scheduled listed chemical products. Interim final rule with request for comment.

    PubMed

    2006-09-26

    In March 2006, the President signed the Combat Methamphetamine Epidemic Act of 2005, which establishes new requirements for retail sales of over-the-counter (nonprescription) products containing the List I chemicals ephedrine, pseudoephedrine, and phenylpropanolamine. The three chemicals can be used to manufacture methamphetamine illegally. DEA is promulgating this rule to incorporate the statutory provisions and make its regulations consistent with the new requirements. This action establishes daily and 30-day limits on the sales of scheduled listed chemical products to individuals and requires recordkeeping on most sales.

  18. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  19. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  20. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  1. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  2. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  3. 76 FR 43260 - Foreign-Trade Zone 72-Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...

  4. 75 FR 60436 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  5. 75 FR 24667 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  6. 75 FR 10476 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  7. 76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  8. 75 FR 15420 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an interim...

  9. 76 FR 59119 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim...

  10. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…

  11. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 26 2011-07-01 2011-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  12. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 25 2010-07-01 2010-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  13. 76 FR 15028 - Airport Improvement Program (AIP): Interim Policy Regarding Access to Airports From Residential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...

  14. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  15. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  16. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...

  17. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false EPA Interim Primary Drinking Water Standards III Appendix III to Part 265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Pt....

  18. 75 FR 65528 - Membership of the National Science Board's Senior Executive Service Performance Review Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ...: Comments should be addressed to Interim Director, Division of Human Resource Management and Chief Human.... Judith S. Sunley, Interim Director, Division of Human Resource Management and Chief Human Capital Officer..., Interim Director, Division of Human Resource Management and Chief Human Capital Officer. [FR Doc. 2010...

  19. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  20. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

Top