Sample records for interim stabilization project

  1. Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 2nd interim report.

    DOT National Transportation Integrated Search

    1995-02-01

    This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586 00. This was a complete recon...

  2. Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 1st interim report.

    DOT National Transportation Integrated Search

    1993-05-01

    This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586.00. This was a complete recon...

  3. Evaluation of experimental flexible pavements : interim report no. 1, construction of Altavista Bypass experimental pavement.

    DOT National Transportation Integrated Search

    1974-01-01

    Deflection tests conducted during the construction and shortly after the completion of a large experimental pavement project are reported. Four different pavement designs, as follows, are compared: 1. 6-inch cement stabilized subgrade, 6-inch crushed...

  4. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...

  5. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...

  6. Generator Set Environmental and Stability Testing

    DTIC Science & Technology

    2015-03-01

    UNCLASSIFIED GENERATOR SET ENVIRONMENTAL AND STABILITY TESTING INTERIM REPORT TFLRF No. 460 by Gregory A. Hansen Edwin A...it to the originator. UNCLASSIFIED GENERATOR SET ENVIRONMENTAL AND STABILITY TESTING INTERIM REPORT TFLRF No. 460 by...TITLE AND SUBTITLE Generator Set Environmental and Stability Testing 5a. CONTRACT NUMBER W56HZV-09-C-0100 5b. GRANT NUMBER 5c. PROGRAM

  7. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...

  8. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...

  9. Prosthodontic Rehabilitation of Patients with Bell's Palsy: Our Experience.

    PubMed

    Rajapur, Anand; Mitra, Nirban; Prakash, V Jeevan; Rah, Sajad Ahmad; Thumar, Sagar

    2015-01-01

    Bell's palsy is an idiopathic unilateral lower motor neuron paresis or paralysis of the facial nerve of sudden onset. It involves loss of muscular control on the affected side of the face. This paper reports the prosthodontic management of patients with Bell's palsy and also describes a technique to stabilize the jaw movements in complete denture patients using interim dentures. A 65-year-old male edentulous patient and a 55-year-old female edentulous patient reported to the department of prosthodontics to get their missing teeth replaced. They both gave history of facial paralysis and were diagnosed for Bell's palsy. Interim training dentures with flat occlusal tables were fabricated first to correct and stabilize their mandibular movements. During initial 4 weeks, there was poor functioning of the interim dentures. Gradually by 8(th) week the patients started stabilizing the interim dentures and were functional. After observing the improvement when the patients had no pain and could stabilize and use the treatment dentures successfully, definitive complete dentures were fabricated. This case report presents a systematic approach to successively rehabilitate edentulous patients with Bell's palsy.

  10. Prosthodontic Rehabilitation of Patients with Bell’s Palsy: Our Experience

    PubMed Central

    Rajapur, Anand; Mitra, Nirban; Prakash, V Jeevan; Rah, Sajad Ahmad; Thumar, Sagar

    2015-01-01

    Bell’s palsy is an idiopathic unilateral lower motor neuron paresis or paralysis of the facial nerve of sudden onset. It involves loss of muscular control on the affected side of the face. This paper reports the prosthodontic management of patients with Bell’s palsy and also describes a technique to stabilize the jaw movements in complete denture patients using interim dentures. A 65-year-old male edentulous patient and a 55-year-old female edentulous patient reported to the department of prosthodontics to get their missing teeth replaced. They both gave history of facial paralysis and were diagnosed for Bell’s palsy. Interim training dentures with flat occlusal tables were fabricated first to correct and stabilize their mandibular movements. During initial 4 weeks, there was poor functioning of the interim dentures. Gradually by 8th week the patients started stabilizing the interim dentures and were functional. After observing the improvement when the patients had no pain and could stabilize and use the treatment dentures successfully, definitive complete dentures were fabricated. This case report presents a systematic approach to successively rehabilitate edentulous patients with Bell’s palsy. PMID:26668488

  11. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TORRES, T.D.

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will bemore » exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the manufacturer's stated shelf life. In order to determine the transfer line service life this evaluation examines the certification of shelf life, the certification of chemical compatibility with waste, catalog information of ambient ratings and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials. During initial hose procurements, the hose-in-hose transfer line vendor River Bend Hose Specialty (RBHS) submitted a letter, dated 6/8/00, which recommended the service and shelf life of the hose to be seven years. In submittals for later hose procurements, RBHS submitted a letter, dated 11/6/00, which recommended the service life of the hose to be three years. This submittal was followed by documentation, on 2/14/01, which submitted new storage requirements and restated the seven year shelf life. RBHS revised their original hose service life estimate to a more conservative three years due to concerns over the effects of chemicals in transferred waste. The above mentioned submittals from RBHS are the primary drivers of the three year service life limit established by this document.« less

  12. A computer-aided approach to nonlinear control systhesis

    NASA Technical Reports Server (NTRS)

    Wie, Bong; Anthony, Tobin

    1988-01-01

    The major objective of this project is to develop a computer-aided approach to nonlinear stability analysis and nonlinear control system design. This goal is to be obtained by refining the describing function method as a synthesis tool for nonlinear control design. The interim report outlines the approach by this study to meet these goals including an introduction to the INteractive Controls Analysis (INCA) program which was instrumental in meeting these study objectives. A single-input describing function (SIDF) design methodology was developed in this study; coupled with the software constructed in this study, the results of this project provide a comprehensive tool for design and integration of nonlinear control systems.

  13. Interim Stabilization Equipment Essential and Support Drawing Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    KOCH, M.R.

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

  14. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  15. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  16. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  17. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  18. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  19. The Urban Consumer Education Project. Interim Report, 1979-80.

    ERIC Educational Resources Information Center

    Marshall, Gail; Haas, Kay

    This interim evaluation report of the St. Louis, Missouri Urban Consumer Education Project assesses program effectiveness in terms of teacher training and teacher knowledge of consumer basics, community resource participation, and student and teacher knowledge. The project was designed to teach fifth grade students their rights and…

  20. 77 FR 31374 - Notice of Submission of Proposed Information Collection to OMB; Rural Housing Stability Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... through the HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP... HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP require...

  1. Interim 2001-based national population projections for the United Kingdom and constituent countries.

    PubMed

    Shaw, Chris

    2003-01-01

    This article describes new 2001-based national population projections which were carried out following the publication in September 2002 of the first results of the 2001 Census. These "interim" projections, carried out by the Government Actuary in consultation with the Registrars General, take preliminary account of the results of the Census which showed that the base population used in previous projections was overestimated. The interim projections also incorporate a reduced assumption of net international migration to the United Kingdom, informed by the first results of the 2001 Census and taking account of more recent migration information. The population of the United Kingdom is now projected to increase from an estimated 58.8 million in 2001 to reach 63.2 million by 2026. The projected population at 2026 is about 1.8 million (2.8 per cent) lower than in the previous (2000-based) projections.

  2. A Process Evaluation of Project Developmental Continuity. Interim Report VI: Executive Summary. Recommendations for Continuing the Impact Study.

    ERIC Educational Resources Information Center

    Granville, Arthur C.; Love, John M.

    This brief report summarizes the analysis and conclusions presented in detail in Interim Report VI regarding the feasibility of conducting a longitudinal study of Project Developmental Continuity (PDC). This project is a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and…

  3. The use of robotics for nondestructive inspection of steel highway bridges and structures: interim report.

    DOT National Transportation Integrated Search

    1998-01-01

    This interim report describes the progress during the first year of a project to develop robotics hardware for nondestructive evaluation of steel structures. The project objectives are to (1) develop and test an improved prototype (POLECAT-II) crawli...

  4. A Model Project in Career Education, K-12. Interim Report, December 1974.

    ERIC Educational Resources Information Center

    Wyoming State Dept. of Education, Cheyenne.

    The document presents an interim report of a project to establish career education programs for K-12 students in the Natrona County School District of Casper, Wyoming. Project activities were divided into: (1) career awareness, grades K-6; (2) career exploration, grades 7-9; (3) career preparation, grades 10-12; and (4) guidance. To meet the…

  5. 21 CFR 180.30 - Brominated vegetable oil.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... million in the finished beverage, pending the outcome of additional toxicological studies on which... INTERIM BASIS PENDING ADDITIONAL STUDY Specific Requirements for Certain Food Additives § 180.30... used on an interim basis as a stabilizer for flavoring oils used in fruit-flavored beverages, for which...

  6. A Non-Traditional Interim Project.

    ERIC Educational Resources Information Center

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  7. Dewey Decimal Classification Online Project: Interim Reports to the Council on Library Resources, April 1984, September 1984, and February 1985.

    ERIC Educational Resources Information Center

    Markey, Karen; Demeyer, Anh N.

    This research project focuses on the implementation and testing of the Dewey Decimal Classification (DDC) system as an online searcher's tool for subject access, browsing, and display in an online catalog. The research project comprises 12 activities. The three interim reports in this document cover the first seven of these activities: (1) obtain…

  8. Interim Particulate Matter Test Method for the Determination of Particulate Matter from Gas Turbine Engines, SERDP Project WP-1538 Final Report

    EPA Science Inventory

    Under Project No. WP-1538 of the Strategic Environmental Research and Development Program, the U. S. Air Force's Arnold Engineering Development Center (AEDC) is developing an interim test method for non-volatile particulate matter (PM) specifically for the Joint Strike Fighter (J...

  9. A Process Evaluation of Project Developmental Continuity, Interim Report VI: Recommendations for Continuing the Impact Study.

    ERIC Educational Resources Information Center

    Granville, Arthur; And Others

    This interim report re-examines data on instrument suitability, comparability of groups, and adequacy of sample size in Year III of the process evaluation of Project Developmental Continuity (PDC) and offers preliminary recommendations concerning the feasibility of continuing the impact study. PDC is a Head Start demonstration program aimed at…

  10. A Process Evaluation of Project Developmental Continuity. Interim Report IV, Volume 2: Development of the Implementation and Cost Studies.

    ERIC Educational Resources Information Center

    Smith, Allen G.; And Others

    This interim report describes the development of program implementation and cost studies for Year II of the process evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Specific areas focused…

  11. A Process Evaluation of Project Developmental Continuity, Interim Report VII, Volume 1: Findings from the PDC Implementation Study.

    ERIC Educational Resources Information Center

    Smith, Allen G.; And Others

    This third year interim report, one of a series of documents on the evaluation of Project Developmental Continuity (PDC), presents findings from three major analyses of program implementation; measurement of the extent each program has implemented the basic PDC Guidelines; a description of patterns of that implementation; and analysis of some…

  12. A Process Evaluation of Project Developmental Continuity. Interim Report III, Executive Summary: Preliminary Recommendations for the Study of Child Impact.

    ERIC Educational Resources Information Center

    Granville, Arthur C.; And Others

    This executive summary presents the major findings of Interim Report III, which reports preliminary evaluation of Project Developmental Continuity (PDC). A Head Start demonstration program, PDC is aimed at promoting greater educational and developmental continuity as children make the transition from preschool to school. The report addresses three…

  13. A Process Evaluation of Project Developmental Continuity. Interim Report IV, Volume I: Pilot Year Impact Study--Instrument Characteristics and Attrition Trends.

    ERIC Educational Resources Information Center

    Granville, Arthur C.; And Others

    This interim report of a pilot year impact study on evaluation methodology is part of a series of documents on the evaluation of Project Developmental Continuity, a Head Start demonstration program aimed at promoting educational and developmental continuity between children's Head Start and primary school experiences. This report deals with…

  14. A Process Evaluation of Project Developmental Continuity, Interim Report VII, Volume 3: Assessment of Program Impact Through the Head Start Year.

    ERIC Educational Resources Information Center

    Granville, Arthur C.; And Others

    This interim report, part of a series of documents examining the feasibility of the longitudinal evaluation of Project Developmental Continuity (PDC), presents the results of an analysis of PDC impact at the Head Start level, using Spring 1977 data. PDC is a Head Start Demonstration Program aimed at providing educational and developmental…

  15. Overview of Materials and Power Applications of Coated Conductors Project

    NASA Astrophysics Data System (ADS)

    Shiohara, Yuh; Taneda, Takahiro; Yoshizumi, Masateru

    2012-01-01

    There are high expectations for coated conductors in electric power applications such as superconducting magnetic energy storage (SMES) systems, power cables, and transformers owing to their ability to contribute to stabilizing and increasing the capacity of the electric power supply grid as well as to reducing CO2 emission as a result of their high critical-current characteristics. Research and development has been performed on wires/tapes and electric power devices worldwide. The Materials and Power Applications of Coated Conductors (M-PACC) Project is a five-year national project in Japan started in 2008, supported by the Ministry of Economy, Trade and Industry (METI) and the New Energy and Industrial Technology Development Organization (NEDO), to develop both coated conductors that meet market requirements and basic technologies for the above-mentioned power applications using coated conductors. In this article, research and development results are reviewed and compared with the interim/final targets of the project, and future prospects are discussed.

  16. Color stability and marginal integrity of interim crowns: An in vitro study

    PubMed Central

    Elagra, Marwa I.; Rayyan, Mohammad R.; Alhomaidhi, Maisam M.; Alanaziy, Areej A.; Alnefaie, Mona O.

    2017-01-01

    Objective: Many commercial dental materials are used to fabricate interim restorations. This study aimed to compare the color stability and the marginal integrity of four different interim crown materials. Materials and Methods: An ivorine right maxillary central incisor was prepared for a full coverage all-ceramic restoration. A total of 36 specimens in the form of crowns were fabricated on the master die using four different materials (n = 9); Polymethyl methacrylate (PMMA) resin (TrimPLUS), PMMA computer-aided design, and computer-aided manufacturing (CAD-CAM) blocks (Ceramill TEMP), cold cure bis-acryl resin (Success CD), and bis-acryl resin dual-cure composite (TempSpan). Color change ΔE for each sample was calculated by measuring its color as Commission Internationale de l’Eclairage L* a* b* with a spectrophotometer before and after immersing in a concentrated tea solution for 7 days. Marginal gap was measured at four reference points using stereomicroscope at ×40. One-way ANOVA and the Tukey multiple comparisons test were used to determine any statistically significant difference between the four groups, (α = 0.05). Results: Success CD showed significantly the greatest color change (7.7) among all the tested materials, while no significant difference was found between the other three materials. TempSpan showed significantly the highest marginal gap formation (430.15 μm), while no significant difference was found between the three other materials. Conclusions: Bis-acryl resin composite materials demonstrated clinically noticeable change in color while PMMA materials demonstrated superior color stability. Dual cure interim materials exhibited significantly higher marginal discrepancy in comparison to PMMA and cold cure bis-acrylic resin materials. CAD-CAM PMMA material exhibited the best color stability and marginal integrity. PMID:28932142

  17. Soil stabilization field trial : interim report II.

    DOT National Transportation Integrated Search

    2002-02-01

    Shrinkage cracks in cement-stabilized bases/subbase can be alleviated by specifying the right cement dosage, or by other additives/procedures that suppress crack susceptibility. A field trial of six 1000 ft sections to investigate several alternative...

  18. Soil stabilization field trial : interim report.

    DOT National Transportation Integrated Search

    2001-04-01

    Shrinkage cracks in cement-stabilized bases/subbase can be alleviated by specifying : the right cement dosage, or by other additives/procedures that suppress crack susceptibility. A field : trial of six 1000 ft test sections to investigate several al...

  19. Soil stabilization field trial : interim report I.

    DOT National Transportation Integrated Search

    2001-04-01

    Shrinkage cracks in cement-stabilized bases/subbase can be alleviated by specifying the right cement dosage, or by other additives/procedures that suppress crack susceptibility. A field trial of six 1000 ft test sections to investigate several altern...

  20. Soil stabilization field trial : interim report III.

    DOT National Transportation Integrated Search

    2003-11-01

    Shrinkage cracks in cement-stabilized bases/subbase can be alleviated by specifying the right cement dosage, or by other additives/procedures that suppress crack susceptibility. A field trial of six 1000 ft test sections to investigate several altern...

  1. Determination of rainfall losses in Virginia, phase II : interim report.

    DOT National Transportation Integrated Search

    1981-01-01

    This interim report summarizes results obtained for the project through May 1981. The objective of the study is to develop rainfall loss parameters for localities in Virginia. For this purpose, the state has been divided into eleven hydrologic region...

  2. Evaluation of US 119 Pine Mountain safety improvements : interim report.

    DOT National Transportation Integrated Search

    2003-10-01

    The safety improvement project for a section of US 119 across Pine Mountain in Letcher County was initiated as an interim effort to address safety issues related t o roadway geometrics and specific problems related to truck traffic. : Specific object...

  3. Evaluation of experimental railroad-highway grade crossings in Louisiana : interim report No. 5.

    DOT National Transportation Integrated Search

    1980-04-01

    This interim report is prepared to provide a review of the performance evaluation exhibited on twenty-three (23) experimental railroad-highway grade-crossing projects in the state of Louisiana. The railroad crossings were installed during a ten-year ...

  4. Using foamed asphalt as a stabilizing agent in full depth reclamation of Route 8 in Belgrade : interim report - first year, December 2003.

    DOT National Transportation Integrated Search

    2003-12-01

    Maine has a variety of soil types throughout the state. Most of these soil types degrade rapidly and have : poor stability. To eliminate the cost of supplying quality road base material from a distant source and : increase the stability of existing s...

  5. Using foamed asphalt as a stabilizing agent in full depth reclamation of Route 8 in Belgrade : interim report - third and fourth year, October 2006.

    DOT National Transportation Integrated Search

    2006-10-01

    Maine has a variety of soil types throughout the state. A majority of these soil types degrade rapidly and : have poor stability. To eliminate the cost of supplying quality road base material from a distant source and : increase the stability of exis...

  6. French Interim MALE UAV Program

    DTIC Science & Technology

    2003-09-02

    MINISTÈRE DE LA DÉFENSE June, 13th 2002 Lcl Monsterleet FAF Staff J. Caron EADS S&DE-ISR FRENCH INTERIM MALE UAV PROGRAM 4 INDUSTRIAL STATUS Report...2003 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE French Interim Male UAV Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) EADS

  7. Conceptual design statement of work for the immobilized low-activity waste interim storage facility project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, T.A., Fluor Daniel Hanford

    1997-02-06

    The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.

  8. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a weather modification project or activity in the United States on January 1 in any year shall submit to the... actual modification activities took place; (2) Number of days on which weather modification activities...

  9. Stability of Beriplast P fibrin sealant: storage and reconstitution.

    PubMed

    Eberhard, Ulrich; Broder, Martin; Witzke, Günther

    2006-04-26

    This study was performed to investigate the stability of Beriplast P fibrin sealant (FS) across a range of storage conditions, both pre- and post-reconstitution. Storage stability of the FS was evaluated during long-term refrigeration (24 months) with or without interim storage at elevated temperatures (40 degrees C for 1 week and 25 degrees C for 1 and 3 months). Stability of individual FS components was assessed by measuring: fibrinogen content, Factor XIII activity (FXIII), thrombin activity and aprotinin potency. The package integrity of each component was also checked (sterility testing, moisture content and pH). Storage stability was also evaluated by testing the reconstituted product for adhesion (tearing force testing after mixing the solutions) and sterility. Reconstitution stability was evaluated following 3-months' storage, for up to 50 h post-reconstitution using the same tests as for the storage stability investigations. Pre-defined specifications were met for fibrinogen content, Factor XIII activity, and thrombin activity, demonstrating storage stability. Package integrity and the functionality and sterility of the reconstituted product were confirmed throughout. Reconstitution stability was demonstrated for up to 50 h following reconstitution, in terms of both tearing force and sterility tests. In conclusion, the storage stability of Beriplast P was demonstrated over a range of 24-month storage schedules including interim exposure to elevated temperature, and the reconstituted product was stable for up to 50 h.

  10. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MAY TH

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revisionmore » includes information on additional feed tanks.« less

  11. The Challenge of Declining Enrolments. Critical Emerging Problems and Recommendations for Immediate Action. Interim Report No. 2. [La Baisse des Effectifs Scolaires. Problemes Critiques et Recommandations pour une Action Immediate. Rapport Preliminaire No. 2].

    ERIC Educational Resources Information Center

    Jackson, Robert W. B.

    This second interim report on declining enrollment in Ontario identifies the major implications of the several factors associated with declining enrollments and makes recommendations for immediate action to contribute to the stability of the system while preparing and initiating long-term policies. The first part of the report deals with…

  12. Grabber arm mechanism for the Italian Research Interim Stage (IRIS)

    NASA Technical Reports Server (NTRS)

    Turci, Edmondo

    1987-01-01

    Two deployable arms, named grabbers, were designed and manufactured to provide lateral stability of the perigee spinning stage which will be deployed from the Space Shuttle cargo bay. The spinning stage is supported by a spin table on a cradle at its base. The Italian Research Interim Stage (IRIS) is designed to carry satellites of intermediate mass up to 900 kg. The requirements are defined and the mechanism is described. Functional test results are presented.

  13. Pupil Inquiry Behavior Analysis and Change Activity. Interim Project Report.

    ERIC Educational Resources Information Center

    Manion, Raymond C.

    This interim report discusses progress toward three major goals of the Pupil Inquiry Behavior Analysis and Change Activity: increased pupil inquiry, changed teacher behavior to facilitate pupil inquiry, and the development of a 32-week course of instruction to provide for these behavioral changes. Data currently available deals with the emotional…

  14. 78 FR 63276 - Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    .... Background There is growing interest in installing solar photovoltaic (PV) and solar hot water (SHW) systems on airports. While solar PV or SHW systems (henceforth referred to as solar energy systems) are... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Interim Policy, FAA Review of Solar...

  15. An Inter-Disciplinary Problem Solving Approach to Environmental Education, Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Egan, Thomas A.; Seidel, Janet C.

    Evaluation of an ESEA Title III project, "An Inter-Disciplinary Problem Solving Approach to Environmental Education" located in Berks County, Pennsylvania, is offered in this interim report. The report is primarily concerned with the degree to which operational and management process objectives are being achieved in each of four…

  16. Study of New Youth Initiatives in Apprenticeship. Interim Report. Volume 2: Site Visit Reports.

    ERIC Educational Resources Information Center

    CSR, Inc., Washington, DC.

    This second volume of the interim report provides detailed case study reports on each of the eight Youth Apprenticeship Projects. (Volume 1, an overview of data from the site visits, is available separately as CE 032 791.) Discussion areas covered in each site visit report are local context/operational environment, administrative information,…

  17. NMSBA Leveraged Project Interim Status Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ivanov, Sergei A.

    We have investigated the quality of copper particles available on the market today and determined their complete unsuitability to be used for copper inks, since all of them were significantly oxidized: there was only 50% of metallic copper in each batch and the rest was Cu 2O and CuO. To date, we have fully identified the challenges and developed the synthesis for large amounts of the copper ink precursor, namely, copper(I) mesityl. Currently, the amounts of tens of grams of the precursor have been obtained. From this precursor, four small batches of copper nanoparticles (50 mg each) have been synthesizedmore » to investigate the possibility of decreasing particle sensitivity to oxygen. These particles have been treated with different surface-stabilizing agents (namely, octylamine, oleylamine, pyridine, benzotriazole, and dodecanethiol) in order to investigate their influence on particle oxygen sensitivity. A batch of copper nanoparticles in the amount of 2 grams has also been synthesized in order to start preparation of test ink batches with different solvents, surfactants, and stabilizers.« less

  18. Long-term storage facility for reactor compartments in Sayda Bay - German support for utilization of nuclear submarines in Russia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolff, Dietmar; Voelzke, Holger; Weber, Wolfgang

    2007-07-01

    The German-Russian project that is part of the G8 initiative on Global Partnership Against the Spread of Weapons and Materials of Mass Destruction focuses on the speedy construction of a land-based interim storage facility for nuclear submarine reactor compartments at Sayda Bay near Murmansk. This project includes the required infrastructure facilities for long-term storage of about 150 reactor compartments for a period of about 70 years. The interim storage facility is a precondition for effective activities of decommissioning and dismantlement of almost all nuclear-powered submarines of the Russian Northern Fleet. The project also includes the establishment of a computer-assisted wastemore » monitoring system. In addition, the project involves clearing Sayda Bay of other shipwrecks of the Russian navy. On the German side the project is carried out by the Energiewerke Nord GmbH (EWN) on behalf of the Federal Ministry of Economics and Labour (BMWi). On the Russian side the Kurchatov Institute holds the project management of the long-term interim storage facility in Sayda Bay, whilst the Nerpa Shipyard, which is about 25 km away from the storage facility, is dismantling the submarines and preparing the reactor compartments for long-term interim storage. The technical monitoring of the German part of this project, being implemented by BMWi, is the responsibility of the Federal Institute for Materials Research and Testing (BAM). This paper gives an overview of the German-Russian project and a brief description of solutions for nuclear submarine disposal in other countries. At Nerpa shipyard, being refurbished with logistic and technical support from Germany, the reactor compartments are sealed by welding, provided with biological shielding, subjected to surface treatment and conservation measures. Using floating docks, a tugboat tows the reactor compartments from Nerpa shipyard to the interim storage facility at Sayda Bay where they will be left on the on-shore concrete storage space to allow the radioactivity to decay. For transport of reactor compartments at the shipyard, at the dock and at the storage facility, hydraulic keel blocks, developed and supplied by German subcontractors, are used. In July 2006 the first stage of the reactor compartment storage facility was commissioned and the first seven reactor compartments have been delivered from Nerpa shipyard. Following transports of reactor compartments to the storage facility are expected in 2007. (authors)« less

  19. Atmospheric Effects of Subsonic Aircraft: Interim Assessment Report of the Advanced Subsonic Technology Program

    NASA Technical Reports Server (NTRS)

    Friedl, Randall R. (Editor)

    1997-01-01

    This first interim assessment of the subsonic assessment (SASS) project attempts to summarize concisely the status of our knowledge concerning the impacts of present and future subsonic aircraft fleets. It also highlights the major areas of scientific uncertainty, through review of existing data bases and model-based sensitivity studies. In view of the need for substantial improvements in both model formulations and experimental databases, this interim assessment cannot provide confident numerical predictions of aviation impacts. However, a number of quantitative estimates are presented, which provide some guidance to policy makers.

  20. Nutrition and Child Growth and Development in Tunisia. Interim Progress Report, (September 1, 1972--February 28, 1973).

    ERIC Educational Resources Information Center

    Young, Harben Boutourline

    This interim report of the Yale Project describes the progress made on the nutrition and growth study of Tunisian children from September 1, 1972 through February 28, 1973. A major part of the report is devoted to the organizational and data collection problems of the longitudinal study, discussed under the following categories: biomedics,…

  1. The role and meaning of interim housing in housing first programs for people experiencing homelessness and mental illness.

    PubMed

    Zerger, Suzanne; Francombe Pridham, Katherine; Jeyaratnam, Jeyagobi; Connelly, Jolynn; Hwang, Stephen; O'Campo, Patricia; Stergiopoulos, Vicky

    2014-07-01

    The housing first (HF) model for individuals experiencing homelessness and mental illness differs by design from traditional models that require consumers to achieve "housing readiness" by meeting program or treatment prerequisites in transitional housing settings prior to permanent housing placement. Given a growing body of evidence for its favorable outcomes and cost effectiveness, HF is increasingly seen as an alternative to and argument against these traditional programs. As such, it is important that the elements and implementation challenges of the HF model be clearly understood and articulated. This qualitative study explored a largely unexamined aspect of the HF model-the need for and meaning of temporary residential settings (interim housing), a place to stay while waiting to secure permanent housing-using interviews and focus groups with service providers and consumers who experienced interim housing during implementation of HF in a large urban center. Although interim housing may not be necessary for all programs implementing the model, our study revealed numerous reasons and demands for safe, flexible interim housing options, and illustrated how they influence the effectiveness of consumer recovery, continuous service engagement, and housing stability.

  2. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TEDESCHI AR

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technologymore » summary, reported in RPP-RPT-37740.« less

  3. INTERIM -- Starlink Software Environment

    NASA Astrophysics Data System (ADS)

    Pearce, Dave; Pavelin, Cliff; Lawden, M. D.

    Early versions of this paper were based on a number of other papers produced at a very early stage of the Starlink project. They contained a description of a specific implementation of a subroutine library, speculations on the desirable attributes of a software environment, and future development plans. They reflected the experimental nature of the Starlink software environment at that time. Since then, the situation has changed. The implemented subroutine library, INTERIM_DIR:INTERIM.OLB, is now a well established and widely used piece of software. A completely new Starlink software environment (ADAM) has been developed and distributed. Thus the library released in 1980 as `STARLINK' and now called `INTERIM' has reached the end of its development cycle and is now frozen in its current state, apart from bug corrections. This paper has, therefore, been completely rewritten and restructured to reflect the new situation. Its aim is to describe the facilities of the INTERIM subroutine library as clearly and concisely as possible. It avoids speculation, discussion of design decisions, and announcements of future plans.

  4. Bonded functional esthetic prototype: an alternative pre-treatment mock-up technique and cost-effective medium-term esthetic solution.

    PubMed

    McLaren, Edward A

    2013-09-01

    As the economy has receded in recent years, many patients have been inclined to reject dental treatment beyond what they feel is the minimal amount necessary. Increasingly, there has been reluctance to take on the expense of full-mouth restorations and time-consuming procedures. Consequently, clinicians can benefit from innovative, conservative, interim solutions that enable them to provide segment treatment with long-term stability and esthetics, with lower initial cost. The bonded functional esthetic prototype (BFEP) allows fabrication of up to 14 teeth from composite in 1 hour, providing either a pre-treatment restoration or a long-term provisional solution until further treatment can be completed. As demonstrated herein, the BFEP enables superb function, stability, and esthetics in the interim while dispersing the cost of definitive treatment over time.

  5. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  6. Elder Abuse Demonstration Project. Third Interim Report to the Illinois General Assembly on Public Acts 83-1259 and 83-1432.

    ERIC Educational Resources Information Center

    Illinois State Dept. on Aging, Springfield.

    This document contains the third annual interim report of the Illinois Elder Abuse Demonstration Program. It discusses the overall intent of the demonstration program, trends and changes in the third year of the demonstration program compared with the results from the first two years of the program, and achievements and recommendations for a…

  7. St. Francis Rain Garden Water Quality Sampling Interim Data Report; Total Nitrogen, Total Phosphorus, Sediments or Solids, and E. Coli for the period April to June, 2014

    EPA Science Inventory

    This interim data reported is being provided per request to the Metropolitan Sewer District (MSD) to provide summary statistics on a limited set of water quality parameters as measured at the St. Francis Rain Garden site in the Lick Run Valley as it pertains to MSD's Project Grou...

  8. HARD CHROME POLLUTION PREVENTION DEMONSTRATION PROJECT - INTERIM REPORT

    EPA Science Inventory

    In the project, five chromium emission prevention/control devices were tested tha cover the spectrum of prevention/control techniques currently in use in small- and large-size hard chromium electroplating job shops. The Project results show that some of the tested devices had ch...

  9. Progress on plutonium stabilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hurt, D.

    1996-05-01

    The Defense Nuclear Facilities Safety Board has safety oversight responsibility for most of the facilities where unstable forms of plutonium are being processed and packaged for interim storage. The Board has issued recommendations on plutonium stabilization and has has a considerable influence on DOE`s stabilization schedules and priorities. The Board has not made any recommendations on long-term plutonium disposition, although it may get more involved in the future if DOE develops plans to use defense nuclear facilities for disposition activities.

  10. Federal Programs Supporting Educational Change, Vol. 2: Factors Affecting Change Agent Projects.

    ERIC Educational Resources Information Center

    Berman, Paul; Pauly, Edward W.

    This second volume in the change-agent series reports the interim results of an exploratory statistical analysis of a survey of a nationwide sample of 293 change-agent projects funded by four federal demonstration programs--Elementary Secondary Education Act (ESEA) Title III, Innovative Projects; ESEA Title VII, Bilingual Projects; Vocational…

  11. 24 CFR 883.308 - Adjustments to reflect changes in terms of financing.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... projected rate of borrowing (net interest cost), based on a reasonable evaluation of market conditions, on obligations issued to provide interim and permanent financing for the project, (2) The projected cost of..., (4) The projected cost of borrowing and the term of the permanent financing to be provided to the...

  12. 18 CFR 11.17 - Procedures for payment of charges and costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... charge is established for a period for which an interim charge was paid, the Commission will apply the... hydrology, development, and other characteristics of the river basin, demonstrate sufficient stability to...

  13. 18 CFR 11.17 - Procedures for payment of charges and costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... charge is established for a period for which an interim charge was paid, the Commission will apply the... hydrology, development, and other characteristics of the river basin, demonstrate sufficient stability to...

  14. Project International Emphasis Interim Report, July 1991.

    ERIC Educational Resources Information Center

    Blois, Beverly, Ed.; Williams, Barbara

    Project International Emphasis (PIE), a curriculum development effort involving all 24 colleges in the Virginia Community College System (VCCS), focuses on the infusion of globally oriented components across the academic curriculum and in related career development programs. Activities undertaken during the project's first year included an annual…

  15. Louisiana experimental base project : interim report No. 1.

    DOT National Transportation Integrated Search

    1979-11-01

    The Louisiana Experimental Base Project is a research study evaluating the design/performance characteristics of three types of base courses as incorporated into comparable flexible pavement systems on a full-scale test road. Fourteen different test ...

  16. EARLY TRAINING PROJECT. INTERIM REPORT.

    ERIC Educational Resources Information Center

    GRAY, SUSAN W.; KLAUS, RUPERT A.

    THE EARLY TRAINING PROJECT ATTEMPTED TO IMPROVE THE INTELLECTUAL FUNCTIONING AND PERSONAL ADJUSTMENT OF CULTURALLY DISADVANTAGED CHILDREN THROUGH SPECIAL EXPERIENCES IN THE 15- OR 24-MONTHS PRECEDING FIRST GRADE AND IN THE FIRST YEAR OF SCHOOL. THE PROCEDURES OF THE PROJECT CONSISTED OF TWO TRAINING SEQUENCES. THE FIRST SEQUENCE INVOLVED TWO…

  17. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent frommore » buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project`s cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion.« less

  18. The WFIRST Interim Design Reference Mission: Capabilities, Constraints, and Open Questions

    NASA Technical Reports Server (NTRS)

    Kruk, Jeffrey W.

    2012-01-01

    The Project Office and Science Definition Team for the Wide-Field Infrared Survey Telescope (WFIRST) are in the midst of a pre-Phase A study to establish a Design Reference Mission (DRM). An Interim report was released in June 2011, with a final report due later in 2012. The predicted performance of the Interim DRM Observatory will be described, including optical quality, observing efficiency, and sensitivity for representative observing scenarios. Observing constraints and other limitations on performance will also be presented, with an emphasis on potential Guest Observer programs. Finally, a brief status update will be provided on open trade studies of interest to the scientific community. The final DRM may differ from the Interim DRM presented here. However, the underlying requirements of the scientific programs are not expected to change, hence the capabilities of the IDRM are likely to be maintained even if the implementation changes in significant ways.

  19. Evaluation of rubber-asphalt chip seal in Oregon : interim report.

    DOT National Transportation Integrated Search

    1977-05-01

    The Oregon State Highway Division, in cooperation with the Federal Highway Administration, participated in a demonstration project on the evaluation of rubber-asphalt chip seals. The trial projects were placed in Maintenance District 11, in the vicin...

  20. Washing bridges to reduce chloride : interim report.

    DOT National Transportation Integrated Search

    2003-12-01

    Chloride ions are known to promote the corrosion of steel in reinforced concrete. This project was undertaken to investigate the efficacy of washing, to reduce chloride content and chloride ion uptake. The project consists of a laboratory and a field...

  1. A pavement management research program for Oregon highways : interim report.

    DOT National Transportation Integrated Search

    1985-03-01

    This is the first in a series of reports documenting progress on a statewide pavement management research project. The overall project is conducting research into pavement life cycles of different rehabilitation treatment; the cost-effectiveness of e...

  2. Bringing English to Order: A Personal Account of the NCC English Evaluation Project.

    ERIC Educational Resources Information Center

    Clark, Urszula

    1994-01-01

    Provides a personal account of Great Britain's National Curriculum Committee's English Evaluation Project based at Warwick University. Describes the way the interim and final results of the committee were used by higher powers. (HB)

  3. Longitudinal joint treatment : first interim report.

    DOT National Transportation Integrated Search

    2000-11-01

    Maine highways have been showing signs of longitudinal joint failure for a number of : years. In an effort to reduce the amount of joint failures the Maine Department of : Transportation (MDOT) is currently evaluating two projects. One project is mon...

  4. Longitudinal joint treatment : second interim report.

    DOT National Transportation Integrated Search

    2001-09-01

    Maine highways have been showing signs of longitudinal joint failure for a : number of years. In an effort to reduce the amount of joint failures the Maine : Department of Transportation (MDOT) is currently evaluating two projects. One : project is m...

  5. PCP cracking and bridge deck reinforcement : an interim report.

    DOT National Transportation Integrated Search

    2010-10-28

    TxDOT Project 0-6348 Controlling Cracking in Prestressed Concrete Panels and Optimizing Bridge Deck : Reinforcing Steel started on September 1, 2008 and is scheduled to end on August 31, 2012. The project is : proceeding on schedule. This repor...

  6. Longitudinal joint treatment, interim report - third year, March 2004.

    DOT National Transportation Integrated Search

    2004-03-01

    Maine highways have been showing signs of longitudinal joint failure for a number of years. In an effort : to reduce the amount of joint failures the Maine Department of Transportation (MDOT) is currently : evaluating two projects. One project is mon...

  7. Longitudinal joint treatment, interim report - fourth year, March 2005.

    DOT National Transportation Integrated Search

    2005-03-01

    Maine highways have been showing signs of longitudinal joint failure for a number of years. In an effort : to reduce the amount of joint failures the Maine Department of Transportation (MDOT) is currently : evaluating two projects. One project is mon...

  8. Project PRIME. Interim Report Year One 1971-1972 (Purpose and Procedures).

    ERIC Educational Resources Information Center

    Kaufman, Martin J.; And Others

    Project PRIME (Programmed Re-Entry Into Mainstream Education) is concerned with evaluating the effectiveness of programs that aim at integration of handicapped children into regular classrooms. The main goals of the project are to determine which handicapped children can benefit from integration and under which conditions would it prove the most…

  9. Project Elderly. Interim and Final Reports.

    ERIC Educational Resources Information Center

    Miami-Dade Community Coll., FL.

    This report examines Project Elderly, a project developed to provide job possibilities for the older adult in the labor market in metropolitan Miami (FL). A survey questionnaire was developed to (1) assess the opportunities of the elderly for re-entry into volunteer and paid employment positions; (2) determine the extent of the senior population…

  10. Visual detection of driving while intoxicated. Project interim report : identification of visual cues and development of detection methods

    DOT National Transportation Integrated Search

    1979-01-01

    The report describes the initial phase of a two-phase project on the visual, on-the-road detection of driving while intoxicated (DWI). The purpose of the overall project is to develop and test procedures for enhancing on-the-road detection of DWI. Th...

  11. Emerging Technologies for the Remediation of Metals in Soils, Insitu Stabilization/Inplace Inactivation

    DTIC Science & Technology

    1997-12-01

    implement, they may also serve as interim measures for reducing risk prior to subsequent phytoremediation or remediation by other techniques. 2.0...are essentially non-leachable and pass leachate and TCLP testing protocols. 2.6 Time Requirements Most of the stabilization techniques mentioned above...site. In addition to the attractive low cost of both phytoremediation techniques, these techniques may also be less invasive and more quickly

  12. Recycling of asphalt concrete : Oregon's first hot mix project : interim report.

    DOT National Transportation Integrated Search

    1977-11-01

    The need to reduce fuel consumption and conserve natural resources have been items of ever-increasing importance during recent years. This report discusses a project in which almost 50,000 tons of asphalt concrete placed to carry detour traffic durin...

  13. Texturing of concrete pavements : interim report No. 1.

    DOT National Transportation Integrated Search

    1975-11-01

    The scope of this report is to describe the results obtained during the first twelve-month period of this field research project. It includes the construction of test sections and the evaluation period after the project was opened to traffic. Each te...

  14. Functions and requirements document for interim store solidified high-level and transuranic waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture,more » and interfaces.« less

  15. Interim analysis: A rational approach of decision making in clinical trial.

    PubMed

    Kumar, Amal; Chakraborty, Bhaswat S

    2016-01-01

    Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  16. Texturing of concrete pavements : interim report No. 3.

    DOT National Transportation Integrated Search

    1977-08-01

    The scope of this report is to describe the results obtained at the end of thirty-six months for the third twelve-month period of this field research project. It includes the construction of test sections and the evaluation period after the project w...

  17. New Orleans Effective Schools Project. An Interim Report to the Orleans Parish School Board.

    ERIC Educational Resources Information Center

    David, Jane L.

    The primary goal of the Southern Coalition for Educational Equity's New Orleans Effective Schools Project is to improve academic achievement at one middle school, Martin Behrman, in ways that can be replicated by schools facing similar problems. The Project is based on research findings about school improvement from the school effectiveness…

  18. An Evaluation of ESEA Title III Projects, Fiscal Year 1972. Interim Report.

    ERIC Educational Resources Information Center

    Wilson, Jerusa; And Others

    This report contains descriptions and progress of five projects in the District of Columbia partially or wholly funded by ESEA Title III: (1) The Columbia Road Preschool Pilot Project, a second-year experimental effort designed to serve as a model school providing an experimental setting for early childhood educational programs; (2) The Montessori…

  19. Instructional System Design for Executive Orientation and Project Management Training Packages, Technical Memorandum No. 3. Interim Report. RF Project No. 3131-A1.

    ERIC Educational Resources Information Center

    Cook, Desmond L.; And Others

    This memorandum reports on the third phase, the design, of a four-phase project to design project management training materials for local educational agencies. The first section of the memorandum explains some considerations regarding management education and the organization of the report. Section 2 presents the design specifications for the…

  20. Planning for progress, productivity, and performance.

    PubMed

    Benedict, J M

    1983-10-01

    A project is described for the interim renovation of a labor intensive existing foodservice facility. The renovated area will provide effective food management during the hospital's redevelopment period, including a new foodservice. Objectives of the interim project were to conserve labor while emphasizing control and centralization, provide economic foodservices with improved quality, and incorporate one tray distribution system throughout the hospital complex. Immediate measures were necessary in order to generate funds to proceed. Renovations had to occur without disrupting food-service to patients. The project was planned over a three year period and included an ingredient control area, two patient tray service centres, a renewed production kitchen and test kitchen facility. Each phase has been financed on the understanding that the costs of construction and equipment will be repaid within one fiscal year of operating the renovated facility. Positive results are being achieved, attributable to the support and encouragement received from staff during the change process.

  1. Interim evaluation of the Tier 1 Program of Project P.A.T.H.S.: continuation of evidence.

    PubMed

    Shek, Daniel T L; Yu, Lu; Chan, Alex C W

    2012-01-17

    An interim evaluation study was conducted to understand the implementation of the Tier 1 Program of Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes) in the 2008/09 school year. One hundred and twenty-eight schools were randomly selected to provide information on the implementation details of the program via interviews, telephone interviews and self-completed questionnaires. Results showed that a majority of the workers perceived that the students had positive responses to the program and the program was helpful to the students. Program workers' views toward the implementation of the Tier 1 Program were positive across different grades and program implementation modes. In conjunction with previous studies, the present findings suggest that the Tier 1 Program of Project P.A.T.H.S. is well received by different stakeholders.

  2. INTERIM EPA GUIDANCE FOR GEOSPATIAL-RELATED QUALITY ASSURANCE PROJECT PLANS

    EPA Science Inventory

    This guidance supplements EPA Guidance for Quality,Assurance Project Plans (EPA QA/G-5), in that the focus here is on collection and use of geospatial rather than other environmental data (e.g., strictly chemical or biological data), including unique aspects of data storage, retr...

  3. Evaluation of interior and exterior latex paints : interim report No. 3.

    DOT National Transportation Integrated Search

    1977-11-01

    The scope of this project is twofold: : 1. The primary aim of this project is to find a number of highly qualified interior and exterior latex paints. : 2. The secondary aim is to develop, where necessary, suitable methods for the rapid evaluation of...

  4. Spent Nuclear Fuel (SNF) Project Execution Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LEROY, P.G.

    2000-11-03

    The Spent Nuclear Fuel (SNF) Project supports the Hanford Site Mission to cleanup the Site by providing safe, economic, environmentally sound management of Site spent nuclear fuel in a manner that reduces hazards by staging it to interim onsite storage and deactivates the 100 K Area facilities.

  5. Laboratory evaluation of flyash treated embankment and base materials : interim report No. 1.

    DOT National Transportation Integrated Search

    1986-06-01

    This study was undertaken to provide the Louisiana DOTD with a data base from which decision-making information can be concerning the modification or stabilization of soils using flyash as a full or partial replacement for hydraulic cement or hydrate...

  6. 77 FR 4674 - State Fiscal Stabilization Fund Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... and competing priorities that States were facing in meeting the SFSF data collection and reporting... the interim final requirement (i.e., the notice of proposed revisions to certain data collection and... collection instructions; respondents can provide the requested data in the desired format; reporting burden...

  7. School Capital Manual. An Interim Guide for School Boards, Administrators, Facility Planners and Consultants Who Engage in School Building Projects.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton.

    This manual is intended for use by the Alberta, Canada, school boards, administrators, consultants, education staff, and other individuals involved in school building projects. The purpose of the School Capital Plan, funding, and Alberta Education's funding framework are detailed. The school building project components of the School Capital Plan…

  8. Third year interim report on experimental utilization of tire shreds to enhance highway drainage.

    DOT National Transportation Integrated Search

    2003-04-01

    In the summer of 2000 shredded tires were used in an experimental project on a full highway : reconstruction project in the town of Rome. Shredded tires were used to construct a subgrade drain in the : ditch profile. The picture at right shows the co...

  9. 1997 Toxic Hazards Research Annual Report

    DTIC Science & Technology

    1998-05-01

    TYPE AND DATES COVERED I May 1998 Interim Report - October 1996-September 1997 4 . TITLE AND SUBTITLE 5. FUNDING NUMBERS 1997 Toxic Hazards Research... 4 3 TRICHLOROETHYLENE (TCE) CARCINOGENICITY PROJECT ......................... 7 3.1 SYNTHESIS AND...EXPERIMENTAL ERROR AND INTERINDIVIDUAL VARIABILITY .................. 20 J.Z. Byczkowski and J.C. Lipscomb 4 HALON REPLACEMENT TOXICITY PROJECT

  10. School, Work and Family Planning. Interim Impacts in Project Redirection.

    ERIC Educational Resources Information Center

    Polit, Denise F.; And Others

    Project Redirection was designed to help pregnant and parenting adolescents progress toward eventual self-sufficiency by linking them with community agencies and volunteers at four geographically and ethnically diverse sites in the United States. Distinctive features of the program include: (1) a broad scope of services including employability…

  11. 75 FR 21695 - Interim Notice of Funding Availability for the Department of Transportation's National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... district plans, and other strategies, including land acquisition, designed to create walkable, mixed-use... million of the available TIGER II funds for the planning, preparation, or design of Eligible Projects... manner that will be sustainable for generations to come. Therefore, for projects designed to enhance...

  12. Development of uniform sections for pavement management system inventory and application : interim report.

    DOT National Transportation Integrated Search

    2007-12-01

    This report summarizes the findings of the first phase of LTRC research project 04-2P, which is sponsored by LADOTD. The project is assessing the current status and the state-of-the-practice of the LADOTD pavement management system (PMS). Results of ...

  13. First year interim report on experimental utilization of tire shreds to enhance highway drainage.

    DOT National Transportation Integrated Search

    2001-06-01

    In the summer of 2000 shredded tires were used in an : experimental project on a full highway reconstruction : project in the town of Rome. Shredded tires were used to : construct a subgrade French drain in the ditch profile. The : picture at right s...

  14. Efficiency of erosion control practices of the Virginia Department of Highways and Transportation : interim report.

    DOT National Transportation Integrated Search

    1981-01-01

    Stream monitoring stations have been installed on eight construction projects under Phase 1 of this study. Monitoring on four of the projects is complete and monitoring on the remaining four is continuing. On the basis of the limited data, it appears...

  15. 32 CFR 644.43 - Gross appraisals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... HANDBOOK Appraisal § 644.43 Gross appraisals. (a) Preparation. (1) The gross appraisal sections of real...-type or brief real estate design memoranda on civil works projects are submitted, comparable sales data... issued on the same project and if values have changed in the interim, additional sales data submitted to...

  16. 32 CFR 644.43 - Gross appraisals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... HANDBOOK Appraisal § 644.43 Gross appraisals. (a) Preparation. (1) The gross appraisal sections of real...-type or brief real estate design memoranda on civil works projects are submitted, comparable sales data... issued on the same project and if values have changed in the interim, additional sales data submitted to...

  17. Top 10 research priorities relating to stroke nursing: a rigorous approach to establish a national nurse-led research agenda.

    PubMed

    Rowat, Anne; Pollock, Alex; St George, Bridget; Cowey, Eileen; Booth, Joanne; Lawrence, Maggie

    2016-11-01

    To determine the top 10 research priorities specific to stroke nursing. It is important that stroke nurses build their research capability and capacity. This project built on a previous James Lind Alliance prioritization project, which established the shared stroke research priorities of stroke survivors, carers and health professionals. Research priority setting project using James Lind Alliance methods; a survey for interim prioritization and a consensus meeting for final priority setting. Between September - November 2014, stroke nurses were invited to select their top 10 priorities from a previously established list of 226 unique unanswered questions. These data were used to generate a list of shared research priorities (interim priority setting stage). A purposefully selected group of stroke nurses attended a final consensus meeting (April 2015) to determine the top 10 research priorities. During the interim prioritization stage, 97 stroke nurses identified 28 shared priority treatment uncertainties. At the final consensus meeting, 27 stroke nurses reached agreement on the top 10 stroke nursing research priorities. Five of the top 10 questions relate to stroke-specific impairments and five relate to rehabilitation and long-term consequences of stroke. The research agenda for stroke nursing has now been clearly defined, facilitating nurses to undertake research, which is of importance to stroke survivors and carers and central to supporting optimal recovery and quality of life after stroke. © 2016 John Wiley & Sons Ltd.

  18. In-place cement stabilized base reconstruction techniques interim report : "construction and two year evaluation".

    DOT National Transportation Integrated Search

    2002-08-01

    The purpose of this research was to evaluate the effectiveness of soil cement shrinkage crack mitigation techniques. The contents of this report reflect an evaluation of the construction of the test sections and a two-year evaluation of the test sect...

  19. In-place cement stabilized base reconstruction techniques interim report, "construction and two year evaluation" : technical summary.

    DOT National Transportation Integrated Search

    2002-08-01

    The purpose of this research is to evaluate the effectiveness of soil cement shrinkage crack mitigation techniques. Ten test sections, 1000 feet long, were constructed on LA 89 in Vermilion Parish. The shrinkage crack mitigation methods being evaluat...

  20. Clean Break

    ERIC Educational Resources Information Center

    Peterson, Erin

    2011-01-01

    An interim president has to perform a particularly difficult balancing act. He or she shoulders the burdens from--or legacy of--the previous president and must also provide a foundation of stability for the new president. Throughout the process, effective communication--both internally and externally--is critical to ensuring a smooth transition.…

  1. How well do Reanalysis represent polar lows?

    NASA Astrophysics Data System (ADS)

    Zappa, G.; Shaffrey, L.; Hodges, K.

    2013-12-01

    Polar lows are intense maritime mesocyclones forming at high latitudes during polar air outbreaks. The associated high surface winds can be an important cause of coastal damage.They also seem to play a relevant role in the climate system by modulating the oceanic surface heat fluxes. This creates strong interest in understanding whether modern reanalysis datasets are able to represent polar lows, as well as how their representation may be sensitive to the model resolution. In this talk we investigate how ERA-Interim reanalysis represents the polar lows identified by the Norwegian meteorological services and listed in the STARS (Combination of Sea Surface Temperature and AltimeteR Synergy) dataset for the period 2002-2011. The sensitivity to resolution is explored by comparing ERA-Interim to the ECMWF operational analyses (2008-2011), which have three times higher horizontal resolution compared to ERA-Interim. We show that ERAI-Interim has excellent ability to capture the observed polar lows events with up to 90% of the observed events being found in the reanalysis. However, ERA-Interim tends to have polar lows of weaker dynamical intensity, in terms of both winds and vorticity, and with less spatial structure than in the ECMWF operational analyses (See Fig 1). Furthermore, we apply an objective feature tracking algorithm to the 3 hourly vorticity at 850 hPa with constraints on vorticity intensity and atmospheric static stability to objectively identify polar lows in the ERA-Interim reanalysis. We show that for the stronger polar lows the objective climatology shows good agreement with the STARS dataset over the 2002-2011 period. This allows us to extend the polar lows climatology over the whole ERA Interim period. Differences with another reanalysis product (NCEP-CFSR) will be also discussed. Fig 1: Composite of the tangential wind speed at 925 hPa for 34 polar lows observed in the Norwegian sea between 2008-2010 as represented by the ERA-Interim reanalysis (left) and by the ECMWF Operational analysis (right). Positive values indicate cyclonic circulation. The composite is centered on the polar low vorticity maxima and it is presented for a radial cap of 5 degrees of radius on the sphere (~550Km).

  2. The Flexible Services Development Project 1991. Interim Status Report = Le programme d'elaboration de services adaptables 1991. Rapport d'activite interimaire.

    ERIC Educational Resources Information Center

    Ontario Ministry of Community and Social Services, Toronto.

    This document reports on 13 pilot projects of the Flexible Services Development Project (FSDP), which was initiated in Ontario, Canada, in 1988 to improve child care services for rural families, families with unusual work schedules, families facing short-term emergencies, and families with children who have short-term illnesses. The data and…

  3. Validation of the maximum allowable amounts of recycled binder, RAP, and RAS using accelerated pavement testing - interim report.

    DOT National Transportation Integrated Search

    2014-05-01

    This report summarizes the work conducted on Project 0-6682 up to August 31, 2013. The report is : organized in five chapters corresponding to separate tasks in the project work plan, as follows: : Chapter 1 presents the summary of the findings f...

  4. Longitudinal Evaluation of 2 + 2 Career-Vocational Education Articulation Projects. First Year Interim Report.

    ERIC Educational Resources Information Center

    Evaluation and Training Inst., Los Angeles, CA.

    Twenty-one California career-vocational educational articulation projects, commonly referred to as 2 + 2 partnerships, were jointly funded across the 1986-89 funding period and third-party evaluations were conducted in 1988-89. The longitudinal study examined the long-term effects of the original partnerships. Evaluators formed an advisory…

  5. Improving Student Achievement in a Multidisciplinary Context

    ERIC Educational Resources Information Center

    Chapman, Amanda; Bloxham, Sue

    2004-01-01

    This article analyses interim findings of an ongoing action research project into the use of assessment criteria and grade descriptors in the assessment process. The project is multidisciplinary and covers areas as diverse as Sports Sociology, Economics, Youth and Community Studies, and Education. The idea is to equip first-year students with the…

  6. 78 FR 59231 - Regulated Navigation Area-Tappan Zee Bridge Construction Project, Hudson River; South Nyack and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... 1625-AA11 Regulated Navigation Area--Tappan Zee Bridge Construction Project, Hudson River; South Nyack... Hudson River surrounding the Tappan Zee Bridge. This temporary interim rule allows the Coast Guard to enforce speed and wake restrictions and prohibit all vessel traffic through the RNA during bridge...

  7. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  8. Engineering study of 50 miscellaneous inactive underground radioactive waste tanks located at the Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freeman-Pollard, J.R.

    1994-03-02

    This engineering study addresses 50 inactive underground radioactive waste tanks. The tanks were formerly used for the following functions associated with plutonium and uranium separations and waste management activities in the 200 East and 200 West Areas of the Hanford Site: settling solids prior to disposal of supernatant in cribs and a reverse well; neutralizing acidic process wastes prior to crib disposal; receipt and processing of single-shell tank (SST) waste for uranium recovery operations; catch tanks to collect water that intruded into diversion boxes and transfer pipeline encasements and any leakage that occurred during waste transfer operations; and waste handlingmore » and process experimentation. Most of these tanks have not been in use for many years. Several projects have, been planned and implemented since the 1970`s and through 1985 to remove waste and interim isolate or interim stabilize many of the tanks. Some tanks have been filled with grout within the past several years. Responsibility for final closure and/or remediation of these tanks is currently assigned to several programs including Tank Waste Remediation Systems (TWRS), Environmental Restoration and Remedial Action (ERRA), and Decommissioning and Resource Conservation and Recovery Act (RCRA) Closure (D&RCP). Some are under facility landlord responsibility for maintenance and surveillance (i.e. Plutonium Uranium Extraction [PUREX]). However, most of the tanks are not currently included in any active monitoring or surveillance program.« less

  9. Metropolitan Spokane Region Water Resources Study. Appendix 1. Institutional Analysis

    DTIC Science & Technology

    1976-01-01

    projects in the State of Washington. -It- h"Ithe- ath- -ority to require compliance from all local... projects of relatively modest scope. -rojec- financ- ing is based, as in the case of irrigation districts, on assessments lev- ied on district lands. The ...treatment -facilities would be phased out at that time. The other interim facilities all west of Five Mile Prairie are projected to remain in service

  10. Mobile source air toxics mitigation measures.

    DOT National Transportation Integrated Search

    2013-10-01

    In accordance with the Federal Highway Administration (FHWA) Interim Guidance Update on Mobile Source Air Toxic Analysis in NEPA Documents (September 30, 2009), transportation projects subject to the National Environmental Policy Act (NEPA) mus...

  11. Evaluation of ERA-interim and MERRA Cloudiness in the Southern Oceans

    NASA Technical Reports Server (NTRS)

    Naud, Catherine M.; Booth, James F.; Del Genio, Anthony D.

    2014-01-01

    The Southern Ocean cloud cover modeled by the Interim ECMWF Re-Analysis (ERA-Interim) and Modern- Era Retrospective Analysis for Research and Applications (MERRA) reanalyses are compared against Moderate Resolution Imaging Spectroradiometer (MODIS) and Multiangle Imaging Spectroradiometer (MISR) observations. ERA-Interim monthly mean cloud amounts match the observations within 5%, while MERRA significantly underestimates the cloud amount. For a compositing analysis of clouds in warm season extratropical cyclones, both reanalyses show a low bias in cloud cover. They display a larger bias to the west of the cyclones in the region of subsidence behind the cold fronts. This low bias is larger for MERRA than for ERA-Interim. Both MODIS and MISR retrievals indicate that the clouds in this sector are at a low altitude, often composed of liquid, and of a broken nature. The combined CloudSat-Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) cloud profiles confirm these passive observations, but they also reveal that low-level clouds in other parts of the cyclones are also not properly represented in the reanalyses. The two reanalyses are in fairly good agreement for the dynamic and thermodynamic characteristics of the cyclones, suggesting that the cloud, convection, or boundary layer schemes are the problem instead. An examination of the lower-tropospheric stability distribution in the cyclones from both reanalyses suggests that the parameterization of shallow cumulus clouds may contribute in a large part to the problem. However, the differences in the cloud schemes and in particular in the precipitation processes, which may also contribute, cannot be excluded.

  12. Project Physics Programmed Instruction, Vectors 1.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    This programmed instruction booklet is an interim version of instructional materials being developed by Harvard Project Physics. It is the first in a series of three booklets on vectors and covers the definitions of vectors and scalars, drawing vector quantities to scale, and negative vectors. For others in this series, see SE 015 550 and SE 015…

  13. Job Training for the Homeless: Report on Demonstration's First Year. Research and Evaluation Report Series 91-F.

    ERIC Educational Resources Information Center

    Bailis, Lawrence N.; And Others

    An interim evaluation analyzed the first year of operation of the Job Training for the Homeless Demonstration Program (JTHDP). Data were collected from quarterly progress reports and evaluation reports submitted by 32 local JTHDP projects. The projects exceeded planned levels of clients served and achieved other positive outcomes, including…

  14. Project Physics Programmed Instruction, Waves 1.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    This programmed instruction booklet is an interim version of instructional materials being developed by Harvard Project Physics. It is the first of two booklets on the topic of waves and covers pulses, how pulses travel, and what happens when two pulses pass through the same region at the same time. For the second booklet in this series, see SE…

  15. Interim Report on the Evaluation of the Growth Model Pilot Project

    ERIC Educational Resources Information Center

    Hoffer, Thomas B.; Hedberg, E. C.; Brown, Kevin L.; Halverson, Marie L.; McDonald, Sarah-Kathryn

    2010-01-01

    The Growth Model Pilot Project (GMPP) was initiated to allow states to experiment with adjustments to the No Child Left Behind Act (NCLB) status accountability system in order to improve the validity of AYP determinations by giving schools credit for students who are making significant growth. The pilot allowed states, districts, and schools to…

  16. Solar Heating/Cooling of Buildings: Current Building Community Projects. An Interim Report.

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC. Building Research Advisory Board.

    Projects being carried out by the private sector involving the use of solar energy for heating and cooling buildings are profiled in this report. A substantial portion of the data were collected from a broad cross-section of the building community. Data collection efforts also involved the canvassing of the nearly 200 trade and professional…

  17. Neues "Francais fondamental?" Das Europa-Projekt "Un niveau seuil." (A New "Francais fondamental?" The European Project "A Threshold Level").

    ERIC Educational Resources Information Center

    Raasch, Albert

    1978-01-01

    The project "Threshold Level," initiated by the Council of Europe in 1976, is compared with "Francais fondamental," comparing their aims and their differences. Offered as an interim statement, the article leaves open the question of whether Francais fondamental should be replaced by the the Threshold Level. (IFS/WGA)

  18. Alaska Interim Land Cover Mapping Program; final report

    USGS Publications Warehouse

    Fitzpatrick-Lins, Katherine; Doughty, E.F.; Shasby, Mark; Benjamin, Susan

    1989-01-01

    In 1985, the U.S. Geological Survey initiated a research project to develop an interim land cover data base for Alaska as an alternative to the nationwide Land Use and Land Cover Mapping Program. The Alaska Interim Land Cover Mapping Program was subsequently created to develop methods for producing a series of land cover maps that utilized the existing Landsat digital land cover classifications produced by and for the major land management agencies for mapping the vegetation of Alaska. The program was successful in producing digital land cover classifications and statistical summaries using a common statewide classification and in reformatting these data to produce l:250,000-scale quadrangle-based maps directly from the Scitex laser plotter. A Federal and State agency review of these products found considerable user support for the maps. Presently the Geological Survey is committed to digital processing of six to eight quadrangles each year.

  19. Interim analysis of STR effectiveness

    DOT National Transportation Integrated Search

    1978-01-01

    The present report describes the status of the NHTSA Short Term Rehabilitation Study (STR) as of December, 1977, and summarizes the progress of data collection efforts by the eleven participating ASAP projects. Outcome measures considered as indicati...

  20. Evaluation of full depth asphaltic concrete pavements : interim report.

    DOT National Transportation Integrated Search

    1975-02-01

    This report provides a review of the performance and structural characteristics exhibited on two full depth asphaltic concrete pavement projects constructed on the Louisiana interstate system. : The roughness characteristics of both full depth projec...

  1. General guidelines for active traffic management deployment : interim report.

    DOT National Transportation Integrated Search

    2011-08-01

    Continued growth in travel in congested freeway corridors and limited public funding for expansion and improvement projects are limiting agencies abilities to provide sufficient roadway capacity in major metropolitan areas. Focusing on trip reliab...

  2. Portland cement concrete pavement restoration : final summary report.

    DOT National Transportation Integrated Search

    1988-07-01

    This final summary report is comprised of an Initial Construction Report; a Final Report; and two Interim Reports. These reports document the construction of Louisiana's Portland Cement Concrete Pavement Restoration project and its performance during...

  3. Explanation of Change Cost and Schedule Growth Study Interim Status Briefing

    NASA Technical Reports Server (NTRS)

    Croonce, Thomas; Bitten, Bob; Emmons, Debra

    2010-01-01

    This slide presentation reviews the study to understand the changes in cost and schedule growth for NASA projects. A second goal was to determine the percentage of growth that was outside the control of the project. The study examined project documentation, conducted interviews with key project personnel, and allocated growth events to an Explanation of Change (EoC) tree to quantify the reasons for growth in the scheduled time. This briefing reviews the results of the study of the first 20 missions.

  4. Multipurpose fare media : developments and issues

    DOT National Transportation Integrated Search

    1997-06-01

    This TCRP digest presents the interim findings of TCRP Project A-14, Potential of Multipurpose Fare Media," conducted by Multisystems, Inc., in collaboration with Dove Associates. Inc., and Mundle & Associates, Inc.Included in the digest are (1) a...

  5. Road weather connected vehicle applications : benefit-cost analysis interim report.

    DOT National Transportation Integrated Search

    2013-01-01

    RWMP is currently engaged in a project to evaluate the potential benefits of road weather connected vehicle applications. Of particular interest are the potential improvements in safety, reductions in travel time, improved travel reliability, reducti...

  6. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part A: Program Case Studies. Volume 2.

    ERIC Educational Resources Information Center

    Spencer, Lynn, Ed.

    These 7 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…

  7. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part A: Program Case Studies. Volume I.

    ERIC Educational Resources Information Center

    Spencer, Lynn, Ed.

    These 8 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…

  8. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part B: Recommendations for Measuring Program Impact.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This report presents recommendations for measures to be used in assessing the impact of Project Developmental Continuity (PDC). Chapter I reviews the purpose of the impact study and presents the basic considerations guiding the selection of measures. Chapter II describes the review process that led to the final recommendations. Chapter III…

  9. Assessment of Program Impact Through First Grade, Volume V: Impact on Children. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Berrueta-Clement, John; And Others

    Fifth in a series of six volumes reporting outcomes of the preliminary evaluation of an educational intervention, this report presents the findings of the effects of Project Developmental Continuity (PDC) up to the time the evaluation study's cohort of children completed grade 1. Preliminary findings concerning the relationship between variables…

  10. Interim Reflections on the Corporate University and SME Academy Business Development Innovation and Its Diffusion

    ERIC Educational Resources Information Center

    Dealtry, Richard

    2008-01-01

    Purpose: The purpose of this paper is to reflect on and inform about learning points from ECUANET, a two-year duration best practice action research and transnational networking project as it approaches its final stage. Design/methodology/approach: The paper explicates the key positive and obfuscating dynamics that the project team have had to,…

  11. Consortium for Planning, Developing, and Implementing Exploratory Industrial Career Development Models (Phase I of Three Phases). Interim Report.

    ERIC Educational Resources Information Center

    Oregon State Univ., Corvallis.

    The report describes the organizational phase of a project designed to create program models and supporting literature for exploratory industrial career development programs for grades seven to ten. The project was undertaken by Oregon State University in cooperation with the Oregon State Department of Education and involved the formation of a…

  12. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emissions analysis as listed in § 93.127 need not be explicitly considered): (1) All in-place regionally... must include the project with its original design concept and scope, and the ‘Action’ scenario must include the project with its new design concept and scope. [62 FR 43801, Aug. 15, 1997, as amended at 69...

  13. Investigation of the Public Library as a Linking Agent to Major Scientific, Educational, Social and Environmental Data Bases. Two-Year Interim Report. Annex 2: Publicity Aspects.

    ERIC Educational Resources Information Center

    Summit, Roger K.; Firschein, Oscar

    Project Dialib was a two-year investigation of the impact of on line information retrieval in a public library setting. This volume documents the efforts that were made to publicize the project and to promote the use of the service among library patrons. (JY)

  14. There Is an Alternative: A Report on an Action Research Project to Develop a Framework for Co-Operative Higher Education

    ERIC Educational Resources Information Center

    Neary, Mike; Winn, Joss

    2017-01-01

    This report provides an interim account of a participatory action research project undertaken during 2015-16. The research brought together scholars, students and expert members of the co-operative movement to design a theoretically informed and practically grounded framework for co-operative higher education that activists, educators and the…

  15. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Upper Bodfish in Lake Isabella, CA Interim Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the first 10 months of system operation of an arsenic (As) and uranium (U) removal technology being demonstrated at Upper Bodfish in Lake Isabella, CA. The objectives of the project are to evalua...

  16. Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoffmore » dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.« less

  17. Waste handling and storage in the decontamination pilot projects of JAEA for environments of Fukushima

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nakayama, S.; Kawase, K.; Iijima, K.

    2013-07-01

    After the Fukushima Daiichi nuclear accident, Japan Atomic Energy Agency (JAEA) was chosen by the national government to conduct decontamination pilot projects at selected sites in Fukushima prefecture. Despite tight boundary conditions in terms of timescale and resources, the projects served their primary purpose to develop a knowledge base to support more effective planning and implementation of stepwise regional remediation of the evacuated zone. A range of established, modified and newly developed techniques were tested under realistic field conditions and their performance characteristics were determined. The results of the project can be summarized in terms of site characterization, cleanup andmore » waste management. A range of options were investigated to reduce the volumes of waste produced and to ensure that decontamination water could be cleaned to the extent that it could be discharged to normal drainage. Resultant solid wastes were packaged in standard flexible containers, labelled and stored at the remediation site (temporary storage until central interim storage becomes available). The designs of such temporary storage facilities were tailored to available sites, but all designs included measures to ensure mechanical stability (e.g., filling void spaces between containers with sand, graded cover with soil) and prevent releases to groundwater (impermeable base and cap, gravity flow drainage including radiation monitors and catch tanks). Storage site monitoring was also needed to check that storage structures would not be perturbed by external events that could include typhoons, heavy snowfalls, freeze/thaw cycles and earthquakes. (authors)« less

  18. Activities and interim outcomes of a multi-site development project to promote cognitive support technology use and employment success among postsecondary students with traumatic brain injuries.

    PubMed

    Hendricks, Deborah J; Sampson, Elaine; Rumrill, Phillip; Leopold, Anne; Elias, Eileen; Jacobs, Karen; Nardone, Amanda; Scherer, Marcia; Stauffer, Callista

    2015-01-01

    This article describes the activities and interim outcomes of a multi-site development project called Project Career, designed to promote cognitive support technology (CST) use and employment success for college and university students with traumatic brain injuries (TBIs). To obtain early intervention results from participants in Project Career's first 18 months of operation. Fifty-six students with TBI have participated to date across three implementation sites in Massachusetts, Ohio, and West Virginia, with 25 of these participants being military veterans. Descriptive analyses provide information regarding the participants, the barriers they face due to their TBI in obtaining a post-secondary education, and the impact services provided by Project Career have had to date in ameliorating those difficulties. Inferential statistical analyses provide preliminary results regarding program effectiveness. Preliminary results indicate the program is encouraging students to use CST strategies in the form of iPads and cognitive enhancement applications (also known as 'apps'). Significant results indicate participants are more positive, independent, and social; participants have a more positive attitude toward technology after six months in the program; and participants reported significantly improved experiences with technology during their first six months in the program. Participating students are actively preparing for their careers after graduation through a wide range of intensive vocational supports provided by project staff members.

  19. OUTER LOOP LANDFILL CASE STUDY

    EPA Science Inventory

    This presentation will describe the interim data reaulting from a CRADA between USEPA and Waste Management, Inc. at the outer Loop Landfill Bioreactor research project located in Louisville, KY. Recently updated data will be presented covering landfill solids, gas being collecte...

  20. Predicting High Occupancy Vehicle Lane Demand, Final Report

    DOT National Transportation Integrated Search

    1996-08-01

    ">THIS REPORT PRESENTS THE INTERIM RESULTS OF THIS PROJECT, SPECIFICALLY: 1. A REVIEW OF THE AVAILABLE LITERATURE AND THE EXPERIENCES OF PUBLIC AGENCIES WITH CURRENT METHODS FOR PREDICTING THE DEMAND FOR HOV LANES, 2. THE PROPOSED NEW METHOD...

  1. Implementation of the AASHTO mechanistic-empirical pavement design guide for Colorado.

    DOT National Transportation Integrated Search

    2000-01-01

    The objective of this project was to integrate the American Association of State Highway and Transportation Officials (AASHTO) Mechanistic-Empirical Pavement Design Guide, Interim Edition: A Manual of Practice and its accompanying software into the d...

  2. Rural applications of advanced traveler information systems : recommended actions

    DOT National Transportation Integrated Search

    1997-07-01

    The Recommended Action Plan is one in a series of interim documents for the Rural Applications of Advanced Traveler Information Systems (ATIS) project. Based on the investigation of user needs, a technology review, and concept development and assessm...

  3. Paddys Run Streambank Stabilization Project at the Fernald Preserve, Harrison, OH

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hooten, Gwendolyn; Hertel, Bill; Homer, John

    The Fernald Preserve is a former uranium-processing plant that underwent extensive remediation pursuant to CERCLA and is now managed by the US DOE Office of Legacy Management. While remediation of buildings and soil contamination was completed in 2006, aquifer remediation is ongoing. Paddys Run is a second-order stream that runs to the south along the western side of the Fernald Preserve. The Paddys Run watershed encompasses nearly 41 km2 (16 mi2), including most of the Fernald site. Field personnel conducting routine site inspections in March 2014 observed that Paddys Run was migrating east via bank erosion into the “Pit 3more » Swale,” an area of known surface-water contamination. The soil there was certified pursuant to site regulatory agreements and meets all final remediation levels. However, weekly surface-water monitoring is conducted from two puddles within the swale area, when water that exceeds the final remediation levels is present. Paddys Run had migrated east approximately 4 m (13 ft) in 2 years and was approximately 29 m (95 ft) from the sample location. This rapid migration threatened existing conditions that allowed for continued monitoring of the swale area and also threatened Paddys Run water quality. Therefore, DOE and regulators determined that the east bank of Paddys Run required stabilization. This was accomplished with a design that included the following components: relocation of approximately 145 m (475 ft) of streambed 9 m (30 ft) west, installation of a rock toe along the east bank, installation of two cross-vane in-stream grade-control structures, stabilization of a portion of the east bank using soil encapsulated lifts, and regrading, seeding, and planting within remaining disturbed areas. In an effort to take advantage of low-flow conditions in Paddys Run, construction was initiated in September 2014. Weather delays and subsurface flow within the Paddys Run streambed resulted in an interim shutdown of the project area in December 2014. Construction activities resumed in April 2015, with completion in November 2015. To date, this stabilization project has been successful. The regraded bank and streambed have remained stable, and no compromise to installed cross-vanes, the rock toe, or the soil encapsulated lifts has been observed.« less

  4. Assessment of Program Impact Through First Grade, Volume IV: Impact on Teachers. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Wacker, Sally; And Others

    The fourth in a series reporting evaluation findings on the impact of Project Developmental Continuity (PDC), this volume reports treatment-related and other findings concerning teachers and classrooms up to the time the evaluation study's cohort of children had completed grade 1. Begun at 15 sites in 1974 with the purpose of ensuring that…

  5. Assessment of Program Impact Through First Grade, Volume III: Impact on Parents. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Morris, Mary; And Others

    Third in a series of six, this volume reports findings concerning the impact of Project Developmental Continuity (PDC) on the parents of the evaluation study's cohort of children as well as preliminary findings on the relationship between family characteristics and program outcome variables up to the time the children had completed grade 1. Begun…

  6. Assessment of Program Impact Through First Grade, Volume II: Impact on Institutions. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Rosario, Jose; And Others

    As part of a longitudinal study evaluating program effects, this report, the second in a series of six, describes the impact of Project Developmental Continuity (PDC) on the institutional policies and procedures of participating Head Start centers and elementary schools up to the time the evaluation study's cohort of children had completed grade…

  7. 78 FR 18335 - Central Arizona Project-Rate Order No. WAPA-158

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Project, reflected in Transmission Service Rate Schedules CAP-FT2, CAP-NFT2, and CAP-NITS2, from January 1... existing Rate Schedules CAP-FT2, CAP-NFT2, CAP-NITS2 under Rate Order No. WAPA-124,\\1\\ were approved for a... Transmission Service Rate Schedules CAP-FT2, CAP-NFT2, and CAP-NITS2 on an interim basis effective as of...

  8. A STUDY OF THE EFFECTS OF EXPERIMENTAL PROGRAMS ON PUPIL ACHIEVEMENT OBSERVED DURING FIRST THREE YEARS OF THE PROJECT, SECONDARY MATHEMATICS EVALUATION PROJECT. INTERIM REPORT.

    ERIC Educational Resources Information Center

    ERICKSEN, GERALD L.; RYAN, JAMES J.

    A REPORT IS GIVEN OF THE FIRST 3 YEARS OF A FIELD STUDY CONDUCTED TO DETERMINE THE EFFECTIVENESS OF SEVERAL PROTOTYPE, SECONDARY MATHEMATICS PROGRAMS THAT WERE PRODUCED BY DIFFERENT CURRICULUM DEVELOPMENT GROUPS. MATHEMATICS TEACHERS WHO HAD NO PREVIOUS EXPERIENCE WITH "MODERN" OR EXPERIMENTAL APPROACHES TO MATHEMATICS TAUGHT A SELECTED…

  9. Shared-Time Concept for Area Vocational Education Programs. Community Factors. Interim Report, Part 1 of a Four-Part Series.

    ERIC Educational Resources Information Center

    Meaders, O. Donald, Ed.; Ekpo-ufot, Abel, Ed.

    The Shared-Time Concept project was one of several projects conducted under a grant for a developmental vocational education research and teacher education program based on a clinical school concept. The objectives were (1) to determine the extent and nature of use of shared-time concept for conducting vocational education programs, and (2) to…

  10. WFIRST Project Science Activities

    NASA Technical Reports Server (NTRS)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  11. Texturing of concrete pavements : interim report No. 2.

    DOT National Transportation Integrated Search

    1976-09-01

    The purpose of this research study is to document and evaluate the findings of the Category II experimental concrete texturing project. Under this plan of experimental study, several texting techniques were tried and will be compared in order to dete...

  12. Vibratory roller evaluation study : interim report No. 1.

    DOT National Transportation Integrated Search

    1974-08-01

    The Louisiana Department of Highways has in progress a two phase program to evaluate the use of vibratory rollers in the compaction of asphaltic concrete pavements. Phase one on the first construction project is now complete with eight different vibr...

  13. EXOS research on master controllers for robotic devices

    NASA Technical Reports Server (NTRS)

    Marcus, Beth A.; An, Ben; Eberman, Brian

    1992-01-01

    Two projects are currently being conducted by EXOS under the Small Business Innovation Research (SBIR) program with NASA. One project will develop a force feedback device for controlling robot hands, the other will develop an elbow and shoulder exoskeleton which can be integrated with other EXOS devices to provide whole robot arm and hand control. Aspects covered are the project objectives, important research issues which have arisen during the developments, and interim results of the projects. The Phase 1 projects currently underway will result in hardware prototypes and identification of research issues required for complete system development and/or integration.

  14. The skill of ECMWF long range Forecasting System to drive impact models for health and hydrology in Africa

    NASA Astrophysics Data System (ADS)

    Di Giuseppe, F.; Tompkins, A. M.; Lowe, R.; Dutra, E.; Wetterhall, F.

    2012-04-01

    As the quality of numerical weather prediction over the monthly to seasonal leadtimes steadily improves there is an increasing motivation to apply these fruitfully to the impacts sectors of health, water, energy and agriculture. Despite these improvements, the accuracy of fields such as temperature and precipitation that are required to drive sectoral models can still be poor. This is true globally, but particularly so in Africa, the region of focus in the present study. In the last year ECMWF has been particularly active through EU research founded projects in demonstrating the capability of its longer range forecasting system to drive impact modeling systems in this region. A first assessment on the consequences of the documented errors in ECMWF forecasting system is therefore presented here looking at two different application fields which we found particularly critical for Africa - vector-born diseases prevention and hydrological monitoring. A new malaria community model (VECTRI) has been developed at ICTP and tested for the 3 target regions participating in the QWECI project. The impacts on the mean malaria climate is assessed using the newly realized seasonal forecasting system (Sys4) with the dismissed system 3 (Sys3) which had the same model cycle of the up-to-date ECMWF re-analysis product (ERA-Interim). The predictive skill of Sys4 to be employed for malaria monitoring and forecast are also evaluated by aggregating the fields to country level. As a part of the DEWFORA projects, ECMWF is also developing a system for drought monitoring and forecasting over Africa whose main meteorological input is precipitation. Similarly to what is done for the VECTRI model, the skill of seasonal forecasts of precipitation is, in this application, translated into the capability of predicting drought while ERA-Interim is used in monitoring. On a monitoring level, the near real-time update of ERA-Interim could compensate the lack of observations in the regions. However, ERA-Interim suffers from biases and drifts that limit its application for drought monitoring purposes in some regions.

  15. Hanford Spent Nuclear Fuel Project recommended path forward

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fulton, J.C.

    The Spent Nuclear Fuel Project (the Project), in conjunction with the U.S. Department of Energy-commissioned Independent Technical Assessment (ITA) team, has developed engineered alternatives for expedited removal of spent nuclear fuel, including sludge, from the K Basins at Hanford. These alternatives, along with a foreign processing alternative offered by British Nuclear Fuels Limited (BNFL), were extensively reviewed and evaluated. Based on these evaluations, a Westinghouse Hanford Company (WHC) Recommended Path Forward for K Basins spent nuclear fuel has been developed and is presented in Volume I of this document. The recommendation constitutes an aggressive series of projects to construct andmore » operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. The overall processing and storage scheme is based on the ITA team`s proposed passivation and vault storage process. A dual purpose staging and vault storage facility provides an innovative feature which allows accelerated removal of fuel and sludge from the basins and minimizes programmatic risks beyond any of the originally proposed alternatives. The projects fit within a regulatory and National Environmental Policy Act (NEPA) overlay which mandates a two-phased approach to construction and operation of the needed facilities. The two-phase strategy packages and moves K Basins fuel and sludge to a newly constructed Staging and Storage Facility by the year 2000 where it is staged for processing. When an adjoining facility is constructed, the fuel is cycled through a stabilization process and returned to the Staging and Storage Facility for dry interim (40-year) storage. The estimated total expenditure for this Recommended Path Forward, including necessary new construction, operations, and deactivation of Project facilities through 2012, is approximately $1,150 million (unescalated).« less

  16. Southern California ITS Priority Corridor strategic deployment plan : interim report

    DOT National Transportation Integrated Search

    1998-08-01

    This deployment plan will be the "blueprint" for agencies to follow to ensure that projects are designed and built to conform to the National ITS Architecture and Standards, a requirement for funding under TEA 21. The federal ITS planning and deploym...

  17. Modified rockfall catch fence Mayflower Creek - Detroit Dam : interim Report.

    DOT National Transportation Integrated Search

    1986-07-01

    This experimental features project is located on the North Santiam Highway (#162) between Mayflower Creek and Detroit Dam, approximately 40 miles east of Salem. Here access is limited and the slope is non-uniform. To deal with the problem of falling ...

  18. Teaching Pharmacology to College Teachers

    ERIC Educational Resources Information Center

    Gerald, Michael C.

    1978-01-01

    Although pharmaceutical and biomedical educators are best prepared for teaching undergraduate nonprofessional drug-related courses, few students can capitalize upon such expertise. An alternative described by a course director is to train the college teachers of such students. Major topics presented and representative interim projects are…

  19. Human Factors in Railroad Operations : Activities in Fiscal Year 1973

    DOT National Transportation Integrated Search

    1974-02-01

    This is an interim report covering human factors services rendered by TSC to the FRA under the project: "Human Factors in Railroad Operations," during fiscal year 1973. It reviews all activities briefly and contains more detailed reports on a researc...

  20. INTERIM RADON-RESISTANT CONTRUCTION GUIDELINES FOR USE IN FLORIDA, 1989

    EPA Science Inventory

    The report gives results of a project to investigate, analyze, and develop radon-resistant construction guidelines that are consistent with other building codes and that could be applied to Florida. Literature search resulted in information on radon remediation techniques, new c...

  1. Interim Evaluation of Three Instrumented Bridge Decks in Saco, Montana

    DOT National Transportation Integrated Search

    2006-06-01

    Since the service life of concrete bridge decks designed by traditional procedures is often shorter than desired, : their ability to withstand constant and heavy use in a variety of operating environments is of major concern. In : this project, the r...

  2. Construction and performance monitoring of various asphalt mixes in Illinois : 2016 interim report.

    DOT National Transportation Integrated Search

    2017-02-01

    A series of five experimental projects were constructed to better determine the life-cycle cost and performance of pavement overlays using various levels of asphalt binder replacement (ABR) from use of reclaimed asphalt pavement (RAP), recycled aspha...

  3. Rural applications of advanced traveler information systems : user needs and technology assessment

    DOT National Transportation Integrated Search

    1997-07-01

    The User Needs and Technology Assessment Report is one in a series of interim documents for the Rural Applications of Advanced Traveler Information Systems (ATIS) project. The document describes the research design and findings from rural traveler su...

  4. Imperatives for Effective Post-Conflict Reconstruction Contracting

    DTIC Science & Technology

    2007-03-15

    the transfer of authority from the CPA to the Interim Iraqi Government ( IIG ) in June 2004, the PMO was disestablished. All remaining DFI funds were...turned over the IIG . The Project and Contracting Office (PCO), another ad-hoc temporary organization was created and given the responsibility for...500K for division commanders with respective single transaction limits of $50K and $100K, respectively; weekly reporting; and for projects greater than

  5. Proficiency Guidance on New State Summative Assessments from NWEA

    ERIC Educational Resources Information Center

    Northwest Evaluation Association, 2015

    2015-01-01

    Measures of Academic Progress® (MAP®) computer adaptive interim assessments serve many purposes, from informing instruction to identifying students for intervention to projecting proficiency on state accountability assessments. To make sure its flagship product does the latter, Northwest Evaluation Association™ (NWEA™) routinely conducts studies…

  6. West Valley demonstration project: Alternative processes for solidifying the high-level wastes

    NASA Astrophysics Data System (ADS)

    Holton, L. K.; Larson, D. E.; Partain, W. L.; Treat, R. L.

    1981-10-01

    Two pretreatment approaches and several waste form processes for radioactive wastes were selected for evaluation. The two waste treatment approaches were the salt/sludge separation process and the combined waste process. Both terminal and interim waste form processes were studied.

  7. Variable message fog hazard warning signs to control vehicle operating characteristics : interim report, Interstate 5, North Albany.

    DOT National Transportation Integrated Search

    1972-04-01

    This project is aimed at determining the effectiveness of variable message signs in controlling traffic on an Interstate highway during periods of hazardous driving conditions such as fog, vehicle accidents, or congestion. : The effectiveness of the ...

  8. Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments - Interim Final

    EPA Pesticide Factsheets

    This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.

  9. Using environmental DNA (eDNA) to determine Hellbender distribution : interim report.

    DOT National Transportation Integrated Search

    2017-03-10

    Environmental DNA (eDNA) methods are non-invasive genetic sampling in which DNA from organisms is detected via sampling of water or soil, typically for the purposes of determining the presence or absence of an organism. In this project, we have evalu...

  10. Evaluation of a drainage blanket in an asphalt shoulder section : interim report.

    DOT National Transportation Integrated Search

    1974-02-01

    The aim of this research project was to develop a permeable, yet stable, hot mix asphaltic drainage system for a typical pavement section. Development of such systems should provide the Department with effective means of draining water from highway b...

  11. 77 FR 71019 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-04; Guidance on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-28

    ... Insights from the Fukushima Dai-ichi Accident,'' dated March 12, 2012 (ADAMS Accession No. ML12053A340... resulting nuclear accident, at the Fukushima Dai-ichi nuclear power plant in March 2011. Enclosure 1 to the...

  12. Predicting moisture-induced damage to asphaltic concrete : field evaluation phase, interim report.

    DOT National Transportation Integrated Search

    1977-01-01

    Virginia is one of seven state and federal agencies participating in a field evaluation of a stripping test method developed under NCHRP Project 4-8 (3), "Predicting Moisture- Induced Damage to Asphaltic Concrete." The test method is being used to ev...

  13. Integrating intelligent transportation systems within the transportation planning process : an interim handbook

    DOT National Transportation Integrated Search

    1999-06-01

    The main purpose of Phase I of this project was to develop a methodology for predicting consequences of hazardous material (HM) crashes, such as injuries and property damage. An initial step in developing a risk assessment is to reliably estimate the...

  14. Comparison of "saw and seal" procedure and performance grade binder to minimize thermal cracking : first interim report.

    DOT National Transportation Integrated Search

    2002-06-01

    In an effort to compare performance and cost effectiveness of the Saw and Seal procedure and : Performance Grade (PG) binders, the Maine Department of Transportation (MDOT) constructed an : experimental project in Weston, Maine during the fall ...

  15. South Philadelphia Passive Sampler and Sensor Study - Interim Report

    EPA Science Inventory

    Starting in the June 2013, the U.S. EPA and the City of Philadelphia Air Measurements Services (AMS) began a collaborative research project to investigate how sensor-based, stand-alone air measurements (SAMs) and passive samplers (PSs) can help improve information on air pollutan...

  16. Interim report deliverable 3.2 : focus group management process of the restricted use technology study

    DOT National Transportation Integrated Search

    2005-09-30

    The Altarum Institute, under contract to the Michigan Department of Transportation (MDOT), currently is engaged in a project called the Altarum Restricted Use Technology Study. This study, an 18-month effort, seeks to apply restricted use techn...

  17. Kids Identifying and Defeating Stroke (KIDS): development and implementation of a multiethnic health education intervention to increase stroke awareness among middle school students and their parents.

    PubMed

    Mullen Conley, Kathleen; Juhl Majersik, Jennifer; Gonzales, Nicole R; Maddox, Katherine E; Pary, Jennifer K; Brown, Devin L; Moyé, Lemuel A; Espinosa, Nina; Grotta, James C; Morgenstern, Lewis B

    2010-01-01

    The Kids Identifying and Defeating Stroke (KIDS) project is a 3-year prospective, randomized, controlled, multiethnic school-based intervention study. Project goals include increasing knowledge of stroke signs and treatment and intention to immediately call 911 among Mexican American (MA) and non-Hispanic White (NHW) middle school students and their parents. This article describes the design, implementation, and interim evaluation of this theory-based intervention. Intervention students received a culturally appropriate stroke education program divided into four 50-minute classes each year during the sixth, seventh, and eighth grades. Each class session also included a homework assignment that involved the students' parents or other adult partners. Interim-test results indicate that this educational intervention was successful in improving students' stroke symptom and treatment knowledge and intent to call 911 upon witnessing a stroke compared with controls. The authors conclude that this school-based educational intervention to reduce delay time to hospital arrival for stroke shows early promise.

  18. Parallelization of Rocket Engine Simulator Software (P.R.E.S.S.)

    NASA Technical Reports Server (NTRS)

    Cezzar, Ruknet

    1999-01-01

    Parallelization of Rocket Engine System Software (PRESS) project is part of a collaborative effort with Southern University at Baton Rouge (SUBR), University of West Florida (UWF), and Jackson State University (JSU). The project has started on October 19, 1995, and after a three-year period corresponding to project phases and fiscal-year funding by NASA Lewis Research Center (now Glenn Research Center), has ended on October 18, 1998. The one-year no-cost extension period was granted on June 7, 1998, until October 19, 1999. The aim of this one year no-cost extension period was to carry out further research to complete the work and lay the groundwork for subsequent research in the area of aerospace engine design optimization software tools. The previous progress for the research has been reported in great detail in respective interim and final research progress reports, seven of them, in all. While the purpose of this report is to be a final summary and an valuative view of the entire work since the first year funding, the following is a quick recap of the most important sections of the interim report dated April 30, 1999.

  19. The High-Skilled VET Practitioner: Interim Findings from the Evaluation of the Long-Term Impacts of the Framing the Future Projects in 1999-2000.

    ERIC Educational Resources Information Center

    Mitchell, John; Wood, Sarah; Young, Susan

    Research was conducted in 2000-01 on the long-term impacts of the 200 projects funded by Australia's Framing the Future in 1999 and of the 250 conducted in 2000. Two main research methodologies (case study investigations and a survey) were used for the study. Case study investigations were conducted with the Deaf Education Network in Sydney; South…

  20. Assessment of Program Impact Through First Grade, Volume VI: Summary of Impact on Institutions, Teachers and Classrooms, Parents and Children. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Powell, Marjorie; And Others

    The final volume in a series of six evaluation reports, this document provides a summary of the results of the evaluation of Project Developmental Continuity (PDC), conducted when the evaluation study's cohort of children had completed grade 1. Begun at 15 sites in 1974 with the purpose of ensuring that disadvantaged children receive continuous…

  1. Assessment of Program Impact Through First Grade, Volume I: The Context, Conceptual Approach and Methods of the Evaluation. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Rosario, Jose; And Others

    This volume is the first of a series reporting evaluation findings on the impact of Project Developmental Continuity (PDC) on institutions, classroom staff, parents and children from the time the children entered Head Start through the first grade. PDC was begun in 1974 with the purpose of ensuring that disadvantaged children receive continuous…

  2. Compendium of Dental Residents’ Research Projects and Literature Reviews - 1990

    DTIC Science & Technology

    1991-03-01

    AL-SR-1991-0001 AD-A236 272 COMPENDIUM OF DENTAL RESIDENTS’ RESEARCH PROJECTS AND LITERATURE REVIEWS 1990 CDTIC JNO 6INSi3 Samuel P. Davis...USAF Dental Investigation Service Armstrong Laboratory Human Systems Division (AFSC) 91-01146 Brooks Air Force Base, TX 78235-5000 .,....,,.,,.l. ltfl 91...L, / 041 4li NOTICES This interim special report was submitted by personnel of the Dental Investigation Service, Clinical Sciences Division

  3. Impact of variations in material properties on asphalt pavement life-evaluation of Warren-Scappoose project : interim report.

    DOT National Transportation Integrated Search

    1981-12-01

    Construction and short-term pavement performance problems were noted in the Pacific Northwest and throughout the United States during the past five years. Several reasons have been suggested to explain this sudden change in pavement performance, such...

  4. A Study of Longitudinal Joint Construction Techniques in HMA Pavements (Interim Report - Colorado Project)

    DOT National Transportation Integrated Search

    1996-02-01

    There is a need to identify suitable longitudinal joint construction techniques for multilane hot mix asphalt (HMA) pavements, which can minimize or eliminate cracking at the joint and/or ravelling adjacent to the joint. It is believed that the longi...

  5. 78 FR 33755 - Project Financing Loans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... illustration, a lender might finance only the wind turbine assets and not take or be able to take a security... statute defined a ``renewable energy source'' as ``an energy conversion system fueled from a solar, wind... this RUS requirement in their interim financing arrangement? Should an operation and maintenance...

  6. 76 FR 10089 - Value-Added Producer Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-23

    ..., business plans, and marketing strategies. The program will also provide working capital for expenses such as implementing an existing viable marketing strategy. The Agency will implement the program to meet... projects that develop mid-tier value marketing chains. DATES: This interim rule is effective March 25, 2011...

  7. SCSD: An Interim Report.

    ERIC Educational Resources Information Center

    Educational Facilities Labs., Inc., New York, NY.

    Following a brief history and explication of the School Construction System Development Project, descriptions of a group of standard building components developed to satisfy three objective are presented--(1) to build better schools, (2) to build them more economically, and (3) to build them more rapidly. Detailed structural and performance…

  8. Evaluation of 3-D laser scanning equipment : 2016 interim report.

    DOT National Transportation Integrated Search

    2017-05-01

    As a follow-up to ICT Project R27-030, Evaluation of 3-D Laser Scanning, this report provides findings of an evaluation of 3-D laser : scanning equipment to determine the tangible costs versus benefits and the manpower savings realized by using the e...

  9. Comparison of "saw and seal" procedure and performance grade binder to minimize thermal cracking : interim report - third year.

    DOT National Transportation Integrated Search

    2004-12-01

    In an effort to compare performance and cost effectiveness of the Saw and Seal procedure and : Performance Grade (PG) binders, the Maine Department of Transportation (MDOT) constructed an : experimental project in Weston, Maine during the fall ...

  10. Comparison of "saw and seal" procedure and performance grade binder to minimize thermal cracking : interim report - second year.

    DOT National Transportation Integrated Search

    2004-07-01

    In an effort to compare performance and cost effectiveness of the Saw and Seal procedure and : Performance Grade (PG) binders, the Maine Department of Transportation (MDOT) constructed an : experimental project in Weston, Maine during the fall ...

  11. Interim report deliverable 1.1 : RADAR sensors for transportation applications of the restricted use technology study

    DOT National Transportation Integrated Search

    2005-09-30

    Under Deliverable 1.1 of the Work Plan governing the Altarum Restricted Use Technology Study, the Altarum project team is required to produce an unclassified summary and comprehensive written report of RADAR systems that can potentially address trans...

  12. Interim report deliverable 2.1 : electro-optical sensors for transportation applications of the restricted use technology study

    DOT National Transportation Integrated Search

    2005-09-30

    Under Deliverable 2.1 of the Work Plan governing the Altarum Restricted Use Technology Study, the Altarum project team is required to produce an unclassified summary and comprehensive written report of Electro-Optical (EO) systems that can potentiall...

  13. Evaluation of performance and cost-effectiveness of thin pavement surface treatments : interim report #2.

    DOT National Transportation Integrated Search

    1990-01-01

    This is the second report to result from the subject study. It represents the first major effort to evaluate the available data on "thin pavement surface treatments" in Oregon and to define "cost effectiveness" for this purpose. The 87 projects studi...

  14. Historical and projected changes in the Southern Hemisphere Sub-tropical Jet during winter from the CMIP5 models

    NASA Astrophysics Data System (ADS)

    Chenoli, Sheeba Nettukandy; Ahmad Mazuki, Muhammad Yunus; Turner, John; Samah, Azizan Abu

    2017-01-01

    We present projected changes in the speed and meridional location of the Subtropical Jet (STJ) during winter using output of the Coupled Model Intercomparison Project Phase 5 (CMIP5) models. We use the ERA-Interim reanalysis dataset to evaluate the historical simulations of the STJ by 18 of the CMIP5 models for the period 1979-2012. Based on the climatology of the STJ from ERA-Interim, we selected the area of study as 70°E-290°E and 20°S-40°S, which is over the Indian and Southern Pacific Oceans, and 300-100 hPa to reduce altitude-related bias. An assessment of the ability of the CMIP5 models in simulating ENSO effects on the jet stream were carried out using standardized zonal wind anomalies at 300-100 hPa. Results show that 47 % of the CMIP5 models used in this study were able to simulate ENSO impacts realistically. In addition, it is more difficult for the models to reproduce the observed intensity of ENSO impacts than the patterns. The historical simulations of the CMIP5 models show a wide range of trends in meridional movement and jet strength, with a multi-model mean of 0.04° decade-1 equatorward and 0.42 ms-1 decade-1 respectively. In contrast to the ERA-Interim analysis, 94 % of the CMIP5 models show a strengthening of the jet in the historical runs. Variability of the jet strength is significantly (5 %) linked to the sea surface temperature changes over the eastern tropical Pacific. The CMIP5 model projections with Representative Concentration Pathways (RCPs) 4.5 and 8.5 were used for analysis of changes of the STJ for the period 2011-2099. Based on the RCP 4.5 (RCP 8.5) scenario the multi-model mean trend of the 18 CMIP5 models project a statistically significant (5 % level) increase in jet strength by the end of the century of 0.29 ms-1 decade-1 (0.60 ms-1 decade-1). Also, the mean meridional location of the jet is projected to shift poleward by 0.006° decade-1 (0.042° decade-1) in 2099 during winter, with the only significant (5 %) trend being with RCP 8.5.

  15. Communicating Ocean Sciences to Informal Audiences (COSIA): Interim Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Phillips, Michelle; Smith, Anita; Castori, Pam

    2009-01-01

    Communicating Ocean Sciences to Informal Audiences (COSIA) is a National Science Foundation (NSF)-funded project consisting of seven long-term three-way partnerships between the Lawrence Hall of Science (LHS) and an informal science education institution (ISEI) partnered with an institution of higher education (IHE). Together, educators from the…

  16. The Challenges in Developing VET Competencies in E-Commerce.

    ERIC Educational Resources Information Center

    Mitchell, John

    A formative evaluation was begun of an innovative project funded by the Australian National Training Authority (ANTA) to develop competencies and qualifications in e-commerce. The formative evaluation was designed to focus on inputs, processes, and interim outputs, identifying both good practice and areas for improvement. Findings to date…

  17. Comparison of "saw and seal" procedure and performance grade binder to minimize thermal cracking : interim report - fourth year/final report.

    DOT National Transportation Integrated Search

    2008-12-01

    In an effort to compare performance and cost effectiveness of the Saw and Seal procedure and : Performance Grade (PG) binders, the Maine Department of Transportation (MaineDOT) constructed an : experimental project in Weston, Maine during the f...

  18. 76 FR 21615 - Nectarines and Peaches Grown in California; Suspension of Handling Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... requirements. The orders also authorize production research and marketing research and development projects, as... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Parts 916 and 917 [Doc. No. AMS-FV... Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments...

  19. 78 FR 49735 - Intent To Prepare a Draft Environmental Impact Statement for Dam Safety Study, Lake Lewisville...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... determine appropriate permanent methods for correcting potential problems, interim risk reduction measures... Environmental Impact Statement for Dam Safety Study, Lake Lewisville Dam, Elm Fork Trinity River, Denton County... primary purposes of the project are flood risk management, [[Page 49736

  20. INTERIM GUIDANCE FOR DEVELOPING GLOBAL POSITIONING SYSTEM DATA COLLECTION STANDARD OPERATING PROCEDURES AND QUALITY ASSURANCE PROJECT PLANS

    EPA Science Inventory

    The United States Environmental Protection Agency Geospatial Quality Council developed this document to harmonize the process of collecting, editing, and exporting spatial data of known quality using the Global Positioning System (GPS). Each organizational entity may adopt this d...

  1. THE EDUCATION AND EMPLOYMENT OF TECHNICIANS. INTERIM REPORT.

    ERIC Educational Resources Information Center

    BJORKQUIST, DAVID C., ED.

    THE TECHNICAL MANPOWER CONFERENCE, HELD AT THE PENNSYLVANIA STATE UNIVERSITY CAMPUS ON JANUARY 24 AND 25, 1968, WAS THE FIRST PHASE IN THE DISSEMINATION OF THE RESEARCH PROJECT, "EFFECTS OF FIELD AND JOB ORIENTED TECHNICAL RETRAINING ON MANPOWER UTILIZATION OF THE UNEMPLOYED." THE PRESENTATIONS IN PART I, INTENDED TO PROVIDE BACKGROUND…

  2. 77 FR 30002 - Primary Power, LLC v. PJM Interconnection, LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... Respondent) for the Respondent's failure to designate the Complainant to construct, own, and finance two static VAR compensator (``SVC'') projects sponsored by the Complainant that have been included in the PJM Regional Transmission Expansion Plan. The Complainant requests that the Commission grant emergency, interim...

  3. Putting Data to Work: Interim Recommendations from The Benchmarking Project

    ERIC Educational Resources Information Center

    Miles, Marty; Maguire, Sheila; Woodruff-Bolte, Stacy; Clymer, Carol

    2010-01-01

    As public and private funders have focused on evaluating the effectiveness of workforce development programs, a myriad of data collection systems and reporting processes have taken shape. Navigating these systems takes significant time and energy and often saps frontline providers' capacity to use data internally for program improvement.…

  4. 76 FR 77490 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... be deployed for effective sampling during pulse flows, flood releases, and high riverine turbidity... Interim Flows Project is implemented to maintain sufficient river conditions for fish in the SJRRP... restoration area. Trammel nets will be deployed to drift during short durations in high velocity water in...

  5. Curricular Change: A Model for Analysis.

    ERIC Educational Resources Information Center

    Axelrod, Joseph

    This interim report on 1 project at the Berkeley Center for Research and Development in Higher Education deals with the construction of a theoretical model of the curricular-instructional subsystem. The relationship between student unrest and the poor quality of education in American colleges has long been evident to educational researchers. The…

  6. The Development of a Vocational Diagnostic Program. Interim Report.

    ERIC Educational Resources Information Center

    Barnard, William W.

    A five-phased project is described which was designed to develop more specific diagnostic procedures and instrumentation that would allow both the vocational counselor and the prospective student to determine more effectively specific occupational programs and occupational objectives for education at the postsecondary level. Phases of the project…

  7. Altarum restricted use technology study : interim report, deliverable 3.1 : list of invitees for the focus group

    DOT National Transportation Integrated Search

    2005-09-01

    This study, an 18-month effort, seeks to apply restricted use technology to the mandates of MDOT. For Deliverable 3.1 described in the Work Plan governing the Altarum Restricted Use Technology Study, the Altarum project team is required to provide a ...

  8. 34 CFR 74.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following standards: (1) For equipment with a current per unit fair market value of $5000 or more, the... the cost of the original project or program to the current fair market value of the equipment. (2) If... the current fair market value of the equipment, plus any reasonable shipping or interim storage costs...

  9. Texas flexible pavements and overlays : interim report for phases 2 and 3 - data collection and model calibration.

    DOT National Transportation Integrated Search

    2017-05-01

    This five-year project was initiated to collect materials and pavement performance data on a minimum of 100 : highway test sections around the state of Texas, incorporating both flexible pavements and overlays. Besides : being used to calibrate and v...

  10. 76 FR 56949 - Biomass Crop Assistance Program; Corrections

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    .... ACTION: Interim rule; correction. SUMMARY: The Commodity Credit Corporation (CCC) is amending the Biomass... funds in favor of the ``project area'' portion of BCAP. CCC is also correcting errors in the regulation... INFORMATION: Background CCC published a final rule on October 27, 2010 (75 FR 66202-66243) implementing BCAP...

  11. Reflections on Post-16 Strategies in European Countries. Interim Report of the Leonardo da Vinci/Multiplier Effect Project III.3.a. Priority 2: Forging Links between Educational Establishments and Enterprises (1997-2000) ID 27009. Working Papers, No. 9.

    ERIC Educational Resources Information Center

    Stenstrom, Marja-Leena, Ed.

    This four-part publication contains 19 papers on educational practices and promises for post-16 education in European countries. Part I, the introduction, contains these three papers: "Sharpening Post-16 Education Strategies: Building on the Results of the Previous Projects" (Johanna Lasonen); "'Parity of Esteem' and 'Integrated…

  12. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and US. Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US. Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

  13. Engineering assessment of low-level liquid waste disposal caisson locations at the 618-11 Burial Grounds

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phillips, S.J.; Fischer, D.D.; Crawford, R.C.

    1982-06-01

    Rockwell Hanford Operations is currently involved in an extensive effort to perform interim ground surface stabilization activities at retired low-level waste burial grounds located at the Hanford Site, Richland, Washington. The principal objective of these activities is to promote increased occupational and radiological safety at burial grounds. Interim stabilization activities include: (1) load testing (traversing burial ground surfaces with heavy equipment to promote incipient collapse of void spaces within the disposal structure and overburden), (2) barrier placement (placement of a {ge} 0.6 m soil barrier over existing overburden), and (3) revegetation (establishment of shallow rooted vegetation on the barrier tomore » mitigate deep rooted plant growth and to reduce erosion). Low-level waste disposal caissons were used in 300 Area Burial Grounds as internment structures for containerized liquid wastes. These caissons, by virtue of their contents, design and methods of closure, require long-term performance evaluation. As an initial activity to evaluate long-term performance, the accurate location of these structures is required. This topical report summarizes engineering activities used to locate caissons in the subsurface environment at the Burial Ground. Activities were conducted to locate caissons during surface stabilization activities. The surface locations were marked, photographed, and recorded on an as built engineering drawing. The recorded location of these caissons will augment long-term observations of confinement structure and engineered surface barrier performance. In addition, accurate caisson location will minimize occupational risk during monitoring and observation activities periodically conducted at the burial ground.« less

  14. Dutch Perspective on Coastal Louisiana Flood Risk Reduction and Landscape Stabilization

    DTIC Science & Technology

    2007-04-01

    man-made conditions. In the Netherlands, these interventions span ages dating back to roughly the 23 April, 2007 First Interim Report Dutch...Dutch Case (see below). Doing the right thing after 1953 was based on ages of thinking and acting to cultivate the Delta, to store fresh water and to...through the ages developed to its present state through reclamation of marshlands, increasing water management technologies and through response

  15. Wide Field Infrared Survey Telescope [WFIRST]: Telescope Design and Simulated Performance

    NASA Technical Reports Server (NTRS)

    Goullioud, R.; Content, D. A.; Kuan, G. M.; Moore, J. D.; Chang, Z.; Sunada, E. T.; Villalvazo, J.; Hawk, J. P.; Armani, N. V.; Johnson, E. L.; hide

    2012-01-01

    The ASTRO2010 Decadal Survey proposed multiple missions with NIR focal planes and 3 mirror wide field telescopes in the 1.5m aperture range. None of them would have won as standalone missions WFIRST is a combination of these missions, created by Astro 2010 committee. WFIRST Science Definition Team (SDT) tasked to examine the design. Project team is a GSFC-JPL-Caltech collaboration. This interim mission design is a result of combined work by the project team with the SDT.

  16. SURVEY OF BIBLIOGRAPHIES AND REFERENCE WORKS ON ASIA, AFRICA, LATIN AMERICA, RUSSIA, AND EAST EUROPE--AND COMPILATION OF BIBLIOGRAPHIES ON EAST ASIA, SOUTH ASIA AND AFRICA SOUTH OF THE SAHARA FOR UNDERGRADUATE LIBRARIES. INTERIM REPORT, PHASE ONE.

    ERIC Educational Resources Information Center

    MOREHOUSE, WARD

    THE PURPOSE OF THE PROJECT IS TO ASSIST UNDERGRADUATE LIBRARIES IN STRENGTHENING THEIR RESOURCES ON AREAS OUTSIDE THE PERIMETER OF WESTERN CIVILIZATION USUALLY GIVEN LITTLE ATTENTION BY AMERICAN COLLEGES, WITH SPECIAL EMPHASIS ON EAST AND SOUTH ASIA AND AFRICA SOUTH OF THE SAHARA. UNDER THE PROJECT'S FIRST PHASE, A PANEL OF LIBRARY ADVISERS WAS…

  17. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  18. Standards for Agricultural Occupations Programs in Illinois Community Colleges. Interim Report of the Community College Phase [Phase I] of Project RD1-A8-564 Entitled "Standards for Illinois ABAO Post-Secondary Programs and Secondary Programs in Cook County".

    ERIC Educational Resources Information Center

    Walker, Robert W.; Hemp, Paul E.

    A study was made of Phase 1 of the long-term standards program for agricultural occupations programs for Illinois community colleges. The unique feature of this project was the procedure used to maximize the input of community college teachers in the validation and revision of the national standards. Survey instruments were sent to community…

  19. The Responsiveness of Public Schools to Their Clientele. Milestone 1: Report of Progress.

    ERIC Educational Resources Information Center

    Zeigler, L. Harmon; And Others

    An analysis of the literature dealing with the responsiveness of public institutions to their clientele constitutes the main body of this interim project report. The analysts adopted Dahl and Lindblom's classification of political decision-making processes for summarizing the range of governing systems possible in public education. These four…

  20. Screening for contaminants of emerging concern in Northern Colorado Plateau Network waters: 2015 surface-water data

    USGS Publications Warehouse

    Weissinger, R; Battaglin, William A.; Bradley, Paul M.

    2016-01-01

    Patterns of detections at other sampling locations will be explored in future reports. This is an interim report. Limited sampling will continue in 2016 at selected sites in coordination with the USGS. A final report is expected upon completion of the USGS project in 2017.

  1. 15 CFR 990.56 - Restoration selection-use of a Regional Restoration Plan or existing restoration project.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Restoration Planning... acquire the equivalent of the injured natural resources and services and compensate for interim losses. (b... incident; (iii) Addresses, and is currently relevant to, the same or comparable natural resources and...

  2. 15 CFR 990.56 - Restoration selection-use of a Regional Restoration Plan or existing restoration project.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Restoration Planning... acquire the equivalent of the injured natural resources and services and compensate for interim losses. (b... incident; (iii) Addresses, and is currently relevant to, the same or comparable natural resources and...

  3. Working Parents Project (WPP). Final Interim Report.

    ERIC Educational Resources Information Center

    Mason, Theresa; Espinoza, Renato

    Results are reported from a 2-year study designed to explore how the nature of women's jobs, as viewed by women and their husbands, influences the system of nuclear family relationships and affects parents' involvement with their children's schools. The research has evolved into a comparative exploratory study of the responses of 30 families to…

  4. Unit: The Australian Scene, Inspection Pack, National Trial Print.

    ERIC Educational Resources Information Center

    Australian Science Education Project, Toorak, Victoria.

    As a part of the interim unit materials in the series produced by the Australian Science Education Project, this teachers' guide is composed of five sections: an introduction to nature in the balance, tests, excursion activities, options, and research activities. Options are under the headings: The Changing Face, Australian Soils, Distribution of…

  5. Project Student Concerns: A Study of Minority Student Suspensions. Interim Report.

    ERIC Educational Resources Information Center

    Bickel, Frank; Qualls, Robert

    This report is a summary of research completed during the 1978-79 school year concerning the causes of disproportionate minority student suspensions in the Jefferson County public schools. A review of related literature is presented to illustrate that factors other than student behavior may contribute to school disruptions and high rates of…

  6. Mathematics Practicum at St. Olaf College: Project-Based Learning through Academic Civic Engagement

    ERIC Educational Resources Information Center

    Sanft, Rebecca; Ziegler-Graham, Kathryn

    2018-01-01

    The Mathematics Practicum has been offered at St. Olaf College for over 30 years. The Practicum is a 4-week, January Interim course where three teams of five students work on consulting problems solicited from area businesses, government agencies, and non-profit organizations. These problems have significant mathematical, statistical, and…

  7. Interim Report on the AAC-Mellon Project from Knox College.

    ERIC Educational Resources Information Center

    Peterson, James; Bailey, Stephen

    In 1985, Knox College was chosen to participate in the Association of American Colleges/Mellon Transfer Grant Program, which sought to assist community college students in making the transition to the four-year college environment. Four local community colleges, Carl Sandburg College (CSC), Illinois Central College (ICC), Blackhawk East Community…

  8. Educational Information System for Ontario. Final Report, March 1977-April 1978.

    ERIC Educational Resources Information Center

    Auster, Ethel; Lawton, Stephen B.

    This final report describing the operation and research of the EISO project, which provides online bibliographic search services to educators of Ontario, briefly summarizes the first and second interim reports. In addition, it discusses users and the uses of EISO information by providing mini-case studies to illustrate quantitative data and…

  9. User Selection of Purchased Information Services. Interim Technical Report (June 1975-January 1976).

    ERIC Educational Resources Information Center

    Hall, Homer J.

    Interviews conducted in the first phase of a project to develop a method for user selection of purchased scientific and technical information services identified a number of relationship among different populations of users. Research scientists, engineers, and patent attorneys want convenient access to original data identified in the search.…

  10. Project FARE task II report : urban mass transportation industry survey of reporting capability : interim task II report for July-November 1972 period

    DOT National Transportation Integrated Search

    1972-11-01

    Report contains a description of the work done to evaluate the capability of the urban mass transit industry to report financial and operating data through a uniform reporting system. Techniques used in the evaluation included a questionnaire survey ...

  11. Geographic information system development in the CARETS project

    USGS Publications Warehouse

    Mitchell, William B.; Fegeas, Robin G.; Fitzpatrick, Katherine A.; Hallam, Cheryl A.

    1977-01-01

    Experience in the development of a geographic information system to support the CARETS project has confirmed the considerable advantages that may accrue by paralleling the system development with a rational and balanced system production effort which permits the integration of the education and training of users with interim deliverable products to them. Those advantages include support for a long-term staff plan that recognizes substantial staff changes through system development and implementation, a fiscal plan that provides continuity in resources necessary for total system development, and a feedback system which allows the user to communicate his experiences in using the system. Thus far balance between system development and system production has not been achieved because of continuing large-scale spatial data processing requirements coupled with strong and insistent demands from users for immediately deliverable products from the system. That imbalance has refocussed staffing and fiscal plans from long-term system development to short- and near-term production requirements, continuously extends total system development time, and increases the possibility that later system development may reduce the usefulness of current interim products.

  12. Preliminary Concept of Operations for the Spent Fuel Management System--WM2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cumberland, Riley M; Adeniyi, Abiodun Idowu; Howard, Rob L

    The Nuclear Fuels Storage and Transportation Planning Project (NFST) within the U.S. Department of Energy s Office of Nuclear Energy is tasked with identifying, planning, and conducting activities to lay the groundwork for developing interim storage and transportation capabilities in support of an integrated waste management system. The system will provide interim storage for commercial spent nuclear fuel (SNF) from reactor sites and deliver it to a repository. The system will also include multiple subsystems, potentially including; one or more interim storage facilities (ISF); one or more repositories; facilities to package and/or repackage SNF; and transportation systems. The project teammore » is analyzing options for an integrated waste management system. To support analysis, the project team has developed a Concept of Operations document that describes both the potential integrated system and inter-dependencies between system components. The goal of this work is to aid systems analysts in the development of consistent models across the project, which involves multiple investigators. The Concept of Operations document will be updated periodically as new developments emerge. At a high level, SNF is expected to travel from reactors to a repository. SNF is first unloaded from reactors and placed in spent fuel pools for wet storage at utility sites. After the SNF has cooled enough to satisfy loading limits, it is placed in a container at reactor sites for storage and/or transportation. After transportation requirements are met, the SNF is transported to an ISF to store the SNF until a repository is developed or directly to a repository if available. While the high level operation of the system is straightforward, analysts must evaluate numerous alternative options. Alternative options include the number of ISFs (if any), ISF design, the stage at which SNF repackaging occurs (if any), repackaging technology, the types of containers used, repository design, component sizing, and timing of events. These alternative options arise due to technological, economic, or policy considerations. As new developments regularly emerge, the operational concepts will be periodically updated. This paper gives an overview of the different potential alternatives identified in the Concept of Operations document at a conceptual level.« less

  13. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    NASA Technical Reports Server (NTRS)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  14. Improvement of Global and Regional Mean Sea Level Trends Derived from all Altimetry Missions.

    NASA Astrophysics Data System (ADS)

    Ablain, Michael; Benveniste, Jérôme; Faugere, Yannice; Larnicol, Gilles; Cazenave, Anny; Johannessen, Johnny A.; Stammer, Detlef; Timms, Gary

    2012-07-01

    The global mean sea level (GMSL) has been calculated on a continual basis since January 1993 using data from satellite altimetry missions. The global mean sea level (MSL) deduced from TOPEX/Poseidon, Jason-1 and Jason-2 is increasing with a global trend of 3.2 mm from 1993 to 2010 applying the post glacial rebound (MSL Aviso website http://www.jason.oceanobs.com/msl). Besides, the regional sea level trends bring out an inhomogeneous repartition of the ocean elevation with local MSL slopes ranging from +/- 8 mm/year. A study published in 2009 [Ablain et al., 2009] has shown that the global MSL trend uncertainty was estimated at +/-0.6 mm/year with a confidence interval of 90%. The main sources of errors at global and regional scales are due to the orbit calculation and the wet troposphere correction. But others sea-level components have also a significant impact on the long-term stability of MSL as for instance the stability of instrumental parameters and the atmospheric corrections. Thanks to recent studies performed in Sea Level Essential Climate Variable Project in the frame of the Climate Change Initiative, an ESA Programme, in addition to activities performed within the SALP/CNES, strong improvements have been provided for the estimation of the global and regional MSL trends. In this paper, we propose to describe them; they concern the orbit calculation thanks to new gravity fields, the atmospheric corrections thanks to ERA-interim reanalyses, the wet troposphere corrections thanks to the stability improvement, and also empirical corrections allowing us to link regional time series together better. These improvements are described at global and regional scale for all the altimetry missions.

  15. Improvement of global and regional mean sea level derived from satellite altimetry multi missions

    NASA Astrophysics Data System (ADS)

    Ablain, M.; Faugere, Y.; Larnicol, G.; Picot, N.; Cazenave, A.; Benveniste, J.

    2012-04-01

    With the satellite altimetry missions, the global mean sea level (GMSL) has been calculated on a continual basis since January 1993. 'Verification' phases, during which the satellites follow each other in close succession (Topex/Poseidon--Jason-1, then Jason-1--Jason-2), help to link up these different missions by precisely determining any bias between them. Envisat, ERS-1 and ERS-2 are also used, after being adjusted on these reference missions, in order to compute Mean Sea Level at high latitudes (higher than 66°N and S), and also to improve spatial resolution by combining all these missions together. The global mean sea level (MSL) deduced from TOPEX/Poseidon, Jason-1 and Jason-2 provide a global rate of 3.2 mm from 1993 to 2010 applying the post glacial rebound (MSL aviso website http://www.jason.oceanobs.com/msl). Besides, the regional sea level trends bring out an inhomogeneous repartition of the ocean elevation with local MSL slopes ranging from + 8 mm/yr to - 8 mm/year. A study published in 2009 [Ablain et al., 2009] has shown that the global MSL trend unceratainty was estimated at +/-0.6 mm/year with a confidence interval of 90%. The main sources of errors at global and regional scales are due to the orbit calculation and the wet troposphere correction. But others sea-level components have also a significant impact on the long-term stability of MSL as for instance the stability of instrumental parameters and the atmospheric corrections. Thanks to recent studies performed in the frame of the SALP project (supported by CNES) and Sea-level Climate Change Initiative project (supported by ESA), strong improvements have been provided for the estimation of the global and regional MSL trends. In this paper, we propose to describe them; they concern the orbit calculation thanks to new gravity fields, the atmospheric corrections thanks to ERA-interim reanalyses, the wet troposphere corrections thanks to the stability improvement, and also empirical corrections allowing us to link regional time series together better. These improvements are described at global and regional scale for all the altimetry missions.

  16. Beyond the Illusion of Symmetry: How to Think about Arms Control

    DTIC Science & Technology

    1988-05-01

    Proliferation Treaty of 1970, the ABM Treaty of 1972 and the SALT I Interim Offensive Agreement of 1972. (48:206) It is significant to point out as Joe...34destabilizing" aspects of the ABM system. (76:222) These are the fundamental principles of the next phase of arms control. The SALT Negotiations As...Emerging Soviet capabilities plus ABM and MIRV technologies seriously threatened strategic stability. As the Soviet jnion achieved strategic parity with

  17. Interim Scientific Report, Air Force Grant AFOSR-82-0238, 1 June 1982-31 March 1983,

    DTIC Science & Technology

    1983-03-31

    research, may be found in the dissertation of RIBERA . Other publications are mainly those of the Principal Investigator (see KALMAN [1983, 1982a...doctoral student (now at Marmora Scientific and Industrial Research Institute, Docaeli, TURKEY). Dr. J. Ribera , doctoral student (now on faculty of IESE...stability", Ph. D. dissertation, University of Florida, 63 pages. J. RIBERA (1982] "Identification of linear relations from noisy data", Ph. D. dissertation

  18. Modern technology for landfill waste placement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, D.L.

    1995-12-31

    The City of Albany, New York, together with the principals of Landfill Service Corporation, proposed in November 1991 to demonstrate the successful practice of biostabilized solid waste placement in the newly constructed, double composite lined Interim Landfill located at Rapp Road in the City of Albany. This is a small facility, only 12 acres in area, which is immediately adjacent to residential neighbors. Significant advancements have been made for the control of environmental factors (odors, vectors, litter) while successfully achieving waste stabilization and air space conservations goals. Also, the procedure consumes a significant quantity of landfill leachate. The benefits ofmore » this practice include a dramatic improvement in the orderlines of waste placement with significant reduction of windblown dust and litter. The biostabilization process also reduces the presence of typical landfill vectors such as flies, crows, seagulls and rodents. All of these factors can pose serious problems for nearby residents to the City of Albany`s Interim landfill site. The physically and biologically uniform character of the stabilized waste mass can result in more uniform future landfill settlement and gas production properties. This can allow for more accurate prediction of postclosure conditions and reduction or elimination of remedial costs attendant to post closure gross differential settlement. Recent research in Europe indicates that aerobic pretreatment of waste also reduces contaminant loading of leachate.« less

  19. EVALUATION OF THE EFFECTIVENESS OF COATINGS IN REDUCING DISLODGEABLE ARSENIC, CHROMIUM, AND COPPER FROM CCA TREATED WOOD, INTERIM DATA REPORT

    EPA Science Inventory

    EPA is approximately 20 months into a project to evaluate the performance of wood coatings as a way to prevent arsenic, chromium and copper exposure from the surfaces of CCA treated wood. Potential dermal exposure, as measured by wipe sampling dislodgeable CCA chemical from wood ...

  20. EFF/NRS Data Collection Project, 2000-2001: An Interim Report on the Development of the EFF Assessment Framework.

    ERIC Educational Resources Information Center

    SRI International, Arlington, VA.

    The Equipped for the Future (EFF) framework describes adult performance along these four dimensions: structure of the knowledge-base; fluency of performance; independence of performance; and range of conditions for performance. When completed it will include a developmental sequence of descriptions of learner performance for each EFF standard;…

  1. 77 FR 73057 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-05; Performance of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... height that inundated the Fukushima Dai-ichi nuclear power plant site. The earthquake and tsunami... industry in the northeastern coastal areas of Japan. When the earthquake occurred, Fukushima Dai-ichi Units... loss of cooling capabilities. Following the events at the Fukushima Dai-ichi nuclear power plant, the...

  2. An Information Storage and Retrieval System for Biological and Geological Data. Interim Report.

    ERIC Educational Resources Information Center

    Squires, Donald F.

    A project is being conducted to test the feasibility of an information storage and retrieval system for museum specimen data, particularly for natural history museums. A pilot data processing system has been developed, with the specimen records from the national collections of birds, marine crustaceans, and rocks used as sample data. The research…

  3. The Antwerp (Stair) Case: How a Modernist Architect Staged His Educational and Ideological Programme

    ERIC Educational Resources Information Center

    Couchez, Elke

    2017-01-01

    This paper looks at the educational project of Belgium's acclaimed socialist and modernist architect Renaat Braem (1910-2001). While Braem is foremost remembered as a militant opinion maker, his work as an educator and an artist has received little scrutiny. When Braem was appointed interim director at the Antwerp National Higher Institute for…

  4. CENTER FOR CHILDREN’S ENVIRONMENTAL HEALTH AND DISEASE PREVENTION RESEARCH (P01) (JOINT EPA AND NIEHS) - CHAMACOS

    EPA Science Inventory

    Project A (R834513C001):
    In year 3, we will complete recruitment of new CHAM2 participants, continue data collection at 10½ years, and begin the 12-year visit (in February 2012). Interim visits at 9¾ and 11¼ to assess p...

  5. Harvard University Program on Technology and Society 1964-1972. A Final Review.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Program on Technology and Society.

    Eight years of research by the Harvard University's Program on Technology and Society are summarized. Lengthy abstracts of the 29 books and 164 articles that resulted from the Program, as well as interim accounts of projects not yet completed are presented. The report is divided into four parts; institutions (including business, education, and…

  6. The School Finance Redesign Project: A Synthesis of Work to Date. Interim Summary Report

    ERIC Educational Resources Information Center

    Hill, Paul T.

    2008-01-01

    In the past decade, controversies about public spending on education have grown as states adopted performance standards pledging that every child will learn enough to become an independent productive citizen and as "No Child Left Behind" ("NCLB") has put teeth into those expectations. Educators say that meeting higher standards requires more…

  7. Oral Historical, Documentary and Archaeological Investigations of Colbert, Barton, and Vinton, Mississippi: An Interim Report on Phase I of the Tombigbee Historic Townsites Project. Volume I.

    DTIC Science & Technology

    1982-05-01

    wells, springs, and troughs constructed near artesian wells. Cornmeal and molasses production both required specialized equipment. Inf or- mants recall...their own. Blacks relied heavily on cornmeal , while the white population usually maintained stocks of wheat flour. Transportation. River transportation

  8. Project FARE task III report : urban mass transportation industry reporting system design : interim task III report for November 1972-June 1973 period. Part I - Task summary.

    DOT National Transportation Integrated Search

    1973-06-01

    This report contains a description of the proposed uniform reporting system for the urban mass transit industry. It is presented in four volumes: Part I - Task Summary contains a description of how Task III was accomplished and the conclusions and re...

  9. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT SOUTH TRUCKEE MEADOWS GENERAL IMPROVEMENT DISTRICT (STMIG), NV. INTERIM EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the first 32 weeks of operation of an arsenic and antimony removal technology currently being demonstrated at the South Truckee Meadows General Improvement District (STMGID) in Washoe County, NV. ...

  10. 76 FR 35922 - Interim Staff Guidance Regarding the Environmental Report for Applications To Construct and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... Nuclear Reactor Regulation on the information that should be included in the Environmental Report, which...: Mr. Scott Sloan, Project Manager, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory..., Office of Nuclear Reactor Regulation. [FR Doc. 2011-15227 Filed 6-17-11; 8:45 am] BILLING CODE 7590-01-P ...

  11. Educational Information System for Ontario. Second Interim Report, March 1976-February 1977.

    ERIC Educational Resources Information Center

    Auster, Ethel; Lawton, Stephen B.

    This report of the EISO project, the responsibility of which is the operation of an online bibliographic search service for educators of Ontario, concentrates on research findings collected after EISO had been operational for 16 months. The organization, role, and level of satisfaction of EISO users are treated, the system's impact on a school…

  12. Interim report projects funded by EEC (European Economic Community) for offshore research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parrott, M.

    1978-10-01

    In Nov. 1973, the EEC first adopted the principle of subsidizing work in the offshore field to improve technological development activities; since 1973, the EEC has awarded three programs (for 1974, 1975, and 1977) for 95 projects. The most recent grants, in 1977, for 40 projects at a subsidy cost of $66.8 million are tabulated, showing project category, company, estimated investment, and project description. Project categories include pipelaying, pipeline transport, underwater storage, LNG storage and transport, etc. Under the grant system, the community contributes 40Vertical Bar3< to projects on exploration and production techniques, 35Vertical Bar3< for development of production equipmentmore » and machinery, and 25-30Vertical Bar3< for technological development projects for transport and storage of hydrocarbons. According to the EEC commission, 65 projects have been submitted for a fourth program for which the total amount provided in the budget is $43.8 million.« less

  13. Analysis of Transportation Options for Commercial Spent Fuel in the U.S.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalinina, Elena; Busch, Ingrid Karin

    The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less

  14. Statistics from the Operation of the Low-Level Wind Shear Alert System (LLWAS) during the Joint Airport Weather Studies (JAWS) Project.

    DTIC Science & Technology

    1984-12-01

    AD-RI59 367 STATISTICS FROM THE OPERATION OF THE LOW-LEVEL WIND I/i SHEAR ALERT SYSTEM (L..(U) NATIONAL CENTER FOR ATOMSPHERIC RESEARCH BOULDER CO...NATIONAL BUREAU OF STANDARDS-1963A % % Oh b DOT/FAAIPM-84132 Statistics from the Operation of the Program Engineering Low-Level Wind Shear Alert System and...The Operation of The Low-Level Wind December 1984 Shear Alert System (LLWAS) During The JAWS Project: 6. Performing Organization Code An Interim Report

  15. A Population Consequence of Acoustic Disturbance Model for Cuviers beaked whale (Ziphius cavirostris) in Southern California

    DTIC Science & Technology

    2015-09-30

    two sources. The energetics model that will underpin both PCoD models for Md and Zc has also been published (New et al 2013). The full PCoD model...to Zc on SCORE. We will also be able to use the simplified PCoD model for beaked whales currently being developed under the ONR-funded project...34Using an interim PCoD protocol to assess the effects of disturbance associated with US Navy exercises on marine mammal populations”. This project will

  16. Oral Historical, Documentary, and Archaeological Investigations of Colbert, Barton, and Vinton, Mississippi: An Interim Report on Phase I of the Tombigbee Historic Townsites Project. Volume II.

    DTIC Science & Technology

    1982-05-01

    newcomer to the area. most of his infor- mation was secondhand . However, person and nlace names h nroi.ied zuiced the initial research for this proiect...written many books on Mississinni -ilstrx.. . imrortance his interview to the project is his concise sv-nopis ,: oca1 li t ,r . ! was most familiar... Books of Insane Hospital, 1371-19&0 (Lowndes and Monroe counties) Business Letters (Insurance Companies) IF72-78, 1375-76, :373 (Clay. Lowndes, and

  17. COBRA System Engineering Processes to Achieve SLI Strategic Goals

    NASA Technical Reports Server (NTRS)

    Ballard, Richard O.

    2003-01-01

    The COBRA Prototype Main Engine Development Project was an endeavor conducted as a joint venture between Pratt & Whitney and Aerojet to conduct risk reduction in LOX/LH2 main engine technology for the NASA Space Launch Initiative (SLI). During the seventeen months of the project (April 2001 to September 2002), approximately seventy reviews were conducted, beginning with the Engine Systems Requirements Review (SRR) and ending with the Engine Systems Interim Design Review (IDR). This paper discusses some of the system engineering practices used to support the reviews and the overall engine development effort.

  18. FOD Prevention at NASA-Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Lowrey, Nikki M.

    2011-01-01

    NASA now requires all flight hardware projects to develop and implement a Foreign Object Damage (FOD) Prevention Program. With the increasing use of composite and bonded structures, NASA now also requires an Impact Damage Protection Plan for these items. In 2009, Marshall Space Flight Center released an interim directive that required all Center organizations to comply with FOD protocols established by on-site Projects, to include prevention of impact damage. The MSFC Technical Standards Control Board authorized the development of a new MSFC technical standard for FOD Prevention.

  19. Project Northland: long-term outcomes of community action to reduce adolescent alcohol use.

    PubMed

    Perry, Cheryl L; Williams, Carolyn L; Komro, Kelli A; Veblen-Mortenson, Sara; Stigler, Melissa H; Munson, Karen A; Farbakhsh, Kian; Jones, Resa M; Forster, Jean L

    2002-02-01

    Project Northland was a randomized trial to reduce alcohol use among adolescents in 24 school districts in northeastern Minnesota. Phase 1 (1991-1994), when the targeted cohort was in grades 6-8, included school curricula, parent involvement, peer leadership and community task forces. The Interim Phase (1994-1996) involved minimal intervention. Phase 2 (1996-1998), when the cohort was in grades 11 and 12, included a classroom curriculum, parent education, print media, youth development and community organizing. Outcomes of these interventions were assessed by annual student surveys from 1991 to 1998, alcohol purchase attempts by young-looking buyers in 1991, 1994 and 1998, and parent telephone surveys in 1996 and 1998. Growth curve analysis was used to examine the student survey data over time. Project Northland was most successful when the students were young adolescents. The lack of intervention in the Interim Phase when the students were in grades 9 and 10 had a significant and negative impact on alcohol use. The intervention used with the high school students as those in grades 11 and 12 made a positive impact on their tendency to use alcohol use, binge drinking and ability to obtain alcohol. There was no impact in Phase 2 on other student-level behavioral and psychosocial factors. Developmentally appropriate, multi-component, community-wide programs throughout adolescence appear to be needed to reduce alcohol use.

  20. Tropical cyclone genesis potential index over the western North Pacific simulated by CMIP5 models

    NASA Astrophysics Data System (ADS)

    Song, Yajuan; Wang, Lei; Lei, Xiaoyan; Wang, Xidong

    2015-11-01

    Tropical cyclone (TC) genesis over the western North Pacific (WNP) is analyzed using 23 CMIP5 (Coupled Model Intercomparison Project Phase 5) models and reanalysis datasets. The models are evaluated according to TC genesis potential index (GPI). The spatial and temporal variations of the GPI are first calculated using three atmospheric reanalysis datasets (ERA-Interim, NCEP/NCAR Reanalysis-1, and NCEP/DOE Reanalysis-2). Spatial distributions of July-October-mean TC frequency based on the GPI from ERA-interim are more consistent with observed ones derived from IBTrACS global TC data. So, the ERA-interim reanalysis dataset is used to examine the CMIP5 models in terms of reproducing GPI during the period 1982-2005. Although most models possess deficiencies in reproducing the spatial distribution of the GPI, their multimodel ensemble (MME) mean shows a reasonable climatological GPI pattern characterized by a high GPI zone along 20°N in the WNP. There was an upward trend of TC genesis frequency during 1982 to 1998, followed by a downward trend. Both MME results and reanalysis data can represent a robust increasing trend during 1982-1998, but the models cannot simulate the downward trend after 2000. Analysis based on future projection experiments shows that the GPI exhibits no significant change in the first half of the 21st century, and then starts to decrease at the end of the 21st century under the representative concentration pathway (RCP) 2.6 scenario. Under the RCP8.5 scenario, the GPI shows an increasing trend in the vicinity of 20°N, indicating more TCs could possibly be expected over the WNP under future global warming.

  1. SLUDGE TREATMENT PROJECT COST COMPARISON BETWEEN HYDRAULIC LOADING AND SMALL CANISTER LOADING CONCEPTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GEUTHER J; CONRAD EA; RHOADARMER D

    2009-08-24

    The Sludge Treatment Project (STP) is considering two different concepts for the retrieval, loading, transport and interim storage of the K Basin sludge. The two design concepts under consideration are: (1) Hydraulic Loading Concept - In the hydraulic loading concept, the sludge is retrieved from the Engineered Containers directly into the Sludge Transport and Storage Container (STSC) while located in the STS cask in the modified KW Basin Annex. The sludge is loaded via a series of transfer, settle, decant, and filtration return steps until the STSC sludge transportation limits are met. The STSC is then transported to T Plantmore » and placed in storage arrays in the T Plant canyon cells for interim storage. (2) Small Canister Concept - In the small canister concept, the sludge is transferred from the Engineered Containers (ECs) into a settling vessel. After settling and decanting, the sludge is loaded underwater into small canisters. The small canisters are then transferred to the existing Fuel Transport System (FTS) where they are loaded underwater into the FTS Shielded Transfer Cask (STC). The STC is raised from the basin and placed into the Cask Transfer Overpack (CTO), loaded onto the trailer in the KW Basin Annex for transport to T Plant. At T Plant, the CTO is removed from the transport trailer and placed on the canyon deck. The CTO and STC are opened and the small canisters are removed using the canyon crane and placed into an STSC. The STSC is closed, and placed in storage arrays in the T Plant canyon cells for interim storage. The purpose of the cost estimate is to provide a comparison of the two concepts described.« less

  2. Interim prostacyclin therapy for an isolated disconnected pulmonary artery: a case report.

    PubMed

    Grech, Victor; Grixti, Cynthia

    2010-06-02

    Disconnected pulmonary arteries are unusual and may result in pulmonary hypertension with acute right heart failure. We report a case of a three-month-old Asian girl who presented with heart failure and severe pulmonary hypertension due to a disconnected right pulmonary artery. An epoprostenol (prostacyclin) infusion was instrumental in lowering pulmonary artery pressures and stabilizing the child prior to surgery. This is, to the best of our knowledge, the first report of successful prostacyclin usage in such a situation.

  3. 30 CFR 250.911 - If my platform is subject to the Platform Verification Program, what must I do?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a project management timeline, Gantt Chart, that depicts when interim and final reports required by... 30 Mineral Resources 2 2010-07-01 2010-07-01 false If my platform is subject to the Platform Verification Program, what must I do? 250.911 Section 250.911 Mineral Resources MINERALS MANAGEMENT SERVICE...

  4. Analysis of Syllabi Intending to Prepare Teachers to Be Data Literate: An Interim Report

    ERIC Educational Resources Information Center

    WestEd, 2013

    2013-01-01

    This report documents the work of one component of a larger research effort. The objective of the project is to understand what schools of education are doing to prepare teachers to use data in their practice. The issue is multifaceted, complex, and systemic. Schools of education do not act alone to suddenly introduce courses on data-driven…

  5. National Home Start Evaluation Interim Report VI. Twelve-Month Program Issues, Outcomes and Costs.

    ERIC Educational Resources Information Center

    Goodrich, Nancy; And Others

    This report assesses the progress of the six summative Home Start projects as evaluation families completed their first twelve months of enrollment. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with her…

  6. Evaluating a Systemic Reform Project at the School District Level. Interim Report for the Fresno Systemic Program.

    ERIC Educational Resources Information Center

    Calhoun, Dave

    Systemic reform of mathematics and science education in K-12 schools, sponsored by the National Science Foundation (NSF), was instituted in 1991. Built into the initiatives were guidelines for local (internal) evaluation of programs. This paper is a summary of the evaluation conceptualizations and efforts of one evaluator at the Fresno Unified…

  7. An Interim Report on the Educational Opportunity Centers Program: 2002-03 and 2003-04, with Select Data from 2000-02

    ERIC Educational Resources Information Center

    Hale, Margaret Marcus; Chan, Tsze

    2006-01-01

    Created in 1972, the Educational Opportunity Centers (EOC) Program, one of eight TRIO Programs, funds EOC projects at two- and four-year colleges and universities and public or private agencies or organizations to assist adults from disadvantaged backgrounds to enter or continue a postsecondary education program. Participants in EOC projects…

  8. 78 FR 48201 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2013-01; Guidance for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... following the earthquake and shutdown of the operating units, however, the first large tsunami wave inundated the site, followed by additional waves. The tsunami caused extensive damage to site facilities and..., and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG...

  9. 78 FR 3039 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-06; Performing a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... following the earthquake and shutdown of the operating units, however, the first large tsunami wave inundated the site, followed by additional waves. The tsunami caused extensive damage to site facilities and..., and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG...

  10. Project FARE task III report : urban mass transportation industry reporting system design : interim task III report for November 1972-June 1973 period. Part III - Reporting system forms.

    DOT National Transportation Integrated Search

    1973-06-01

    The report contains a description of the proposed uniform reporting system for the urban mass transit industry. It is presented in four volumes: Part I - Task Summary contains a description of how Task III was accomplished and the conclusions and rec...

  11. Project FARE task III report : urban mass transportation industry reporting system design : interim task III report for November 1972-June 1973 period. Part IV - Commuter rail reporting.

    DOT National Transportation Integrated Search

    1973-06-01

    This report contains a description of the proposed uniform reporting system for the urban mass transit industry. It is presented in four volumes: Part I - Task Summary contains a description of how Task III was accomplished and the conclusions and re...

  12. A Computer-Assisted Instruction Course on Laboratory Detection of Malarial Parasites in Human Blood. Interim Report.

    ERIC Educational Resources Information Center

    Mitzel, Harold E.

    In cooperation with the United States Navy, this project was undertaken to examine the feasibility of computer assisted instruction in clinical malaria recognition, to train a small group of Naval personnel in techniques of creating and presenting such material, and to evaluate the course by giving it to a representative sample of Naval medical…

  13. Family and Community Studies (FACS) Fourth Interim Report, Phase I and Activities and Timelines for Phase II.

    ERIC Educational Resources Information Center

    Espinoza, Renato; And Others

    Discussed in this paper is a preliminary analysis of findings from data gathered during the first phase of a research project exploring the processes whereby the nature of the mother's occupation affects her family life, especially (1) her partnership in decisions about housework, child care and education and (2) the negotiation of the allocation…

  14. Project FARE task III report : urban mass transportation industry reporting system design : interim task III report for November 1972-June 1973 period. Part II - Reporting system instructions.

    DOT National Transportation Integrated Search

    1973-06-01

    This report contains a description of the proposed uniform reporting system for the urban mass transit industry. It is presented in four volumes: Part I - Task Summary contains a description of how Task III was accomplished and the conclusions and re...

  15. Drug Abuse Among Indian Children: Inhalant Abuse Among Young Native Americans. Interim Report.

    ERIC Educational Resources Information Center

    Oetting, E. R.; Goldstein, George S.

    Because of the relatively high rate of drug use among American Indian adolescents, this project was planned to survey the use of drugs, especially inhalants, by American Indian children aged 9-12. As a means of gathering data, interviews were rejected in favor of a simply-worded survey administered to over 1000 children in 9 Southwestern tribes.…

  16. Identity Work among Street-Involved Young Mothers

    ERIC Educational Resources Information Center

    King, Katharine E.; Ross, Lori E.; Bruno, Tara L.; Erickson, Patricia G.

    2009-01-01

    The Youth Pathways Project tracked the life-course trajectories of street-involved young women (n=75) in Toronto over a one-year period. At first contact, 60% of these women had been pregnant, and 29% of those had children. In the interim leading up to the final interview 12 months later, five participants became pregnant and five had given birth.…

  17. Multi Canister Overpack (MCO) Topical Report [SEC 1 THRU 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LORENZ, B.D.

    In February 1995, the US Department of Energy (DOE) approved the Spent Nuclear Fuel (SNF) Project's ''Path Forward'' recommendation for resolution of the safety and environmental concerns associated with the deteriorating SNF stored in the Hanford Site's K Basins (Hansen 1995). The recommendation included an aggressive series of projects to design, construct, and operate systems and facilitates to permit the safe retrieval, packaging, transport, conditions, and interim storage of the K Basins' SNF. The facilities are the Cold VAcuum Drying Facility (CVDF) in the 100 K Area of the Hanford Site and the Canister Storage building (CSB) in the 200more » East Area. The K Basins' SNF is to be cleaned, repackaged in multi-canister overpacks (MCOs), removed from the K Basins, and transported to the CVDF for initial drying. The MCOs would then be moved to the CSB and weld sealed (Loscoe 1996) for interim storage (about 40 years). One of the major tasks associated with the initial Path Forward activities is the development and maintenance of the safety documentation. In addition to meeting the construction needs for new structures, the safety documentation for each must be generated.« less

  18. Development of a microwave clothes dryer: Interim report 4. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, R.; Lenz, R.

    1996-03-01

    The objective of the project is to investigate the microwave drying of clothes and to produce data that potential manufacturers can use in developing marketable microwave dryers. This is an interim report covering activities in 1994, the fifth year of the project. During 1994, three field test dryers were completed, two residential models and one commercial subscale model. All of these dryers operated at a microwave frequency of 2,450 MHz, which is the frequency of home microwave ovens and ovens used in fastfood outlets. Consequently, magnetron tubes for these high-production items are inexpensive. The residential dryers were tested according tomore » the Department of Energy protocols and were 15% more efficient than a top-of-the-line conventional electric dryer. They were also 14% faster. Extensive testing was done to assure that the hazard-detection (sniffer) system would sense degradation of the lighter and shut down the dryer before a fire could occur. Numerous butane lighters were heated to destruction in a microwave oven to examine their failure modes. Lighters were placed in microwave dryers equipped with hazard-detection systems; these systems always detected incipient problems before any fire hazard could occur.« less

  19. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...

  20. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  1. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  2. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...

  3. Mental health pharmacists as interim prescribers

    PubMed Central

    2017-01-01

    Introduction: Turnover leading to fluctuations in prescriber availability presents many challenges, most notably in access to and continuity of care. In 2015, the Veterans Affairs Eastern Colorado Healthcare System (VA ECHCS) experienced a period of significant mental health prescriber turnover leading to patient utilization of psychiatric emergency services (PES) for nonemergent medication management. The resulting increase in volume placed excessive stress on PES prescribers. Mental health pharmacists have opportunities to provide interim medication management while patients are between prescribers. Methods: This study was a retrospective, cohort study of patients unassigned to an outpatient mental health prescriber due to prescriber turnover, receiving care at VA ECHCS between October 1, 2015, and February 28, 2016. The primary outcome was the number of pharmacist interventions performed. Secondary outcomes characterize the interventions performed and describe the change in the mean monthly volume of patients presenting to PES. Results: In this veteran population, 152 interventions were performed in 81 unique patients. The most common intervention was prescription renewals (80%). Interventions most commonly involved antidepressants (28%), antipsychotics (10%), and mood stabilizers (10%). Before initiation of the clinic, Denver VA PES experienced a mean of 300 monthly visits. After clinic implementation, PES visits decreased significantly to a mean of 237 visits per month (P = .041). Discussion: The pharmacist interim prescriber clinic was associated with a significant decrease in mean number of patients seen per month in PES. The success of the clinic also contributed to interest by the mental health service to expand clinical pharmacy services.

  4. Radiological characterization of skyshine from a retired, low-level, radioactive liquid effluent disposal facility at Hanford

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, R.C.; Perkins, C.J.

    1991-02-01

    The 1301-N Liquid Waste Disposal Facility, located on the Hanford Site received N Reactor low-level radioactive liquid process effluent from 1962 to 1985. Radiation emanating from the top of the trench sections was not significant because of the sediments were normally under several meters of water, which provided the necessary shielding. Following retirement of the facility, the liquid in the trench sections percolated into the ground leaving the residual radioactively contaminated sediments unshielded along the bottom and sides of the trench sections. The radioactive constituents of the contaminated sediments include the gamma-emitting isotopes Co-60 and Cs-137. Because of the lackmore » of water covering, some of the gamma photons that were emitted upward were scattered downward due to Compton interaction with atmospheric constituents. This phenomenon is known as skyshine.'' A radiological characterization was required to provide guidance for determining the effectiveness of interim stabilization alternatives that would not adversely affect future Resource Conservation and Recovery Act site closure activities, (e.g., filling in trench sections with spoils from excavation activities). A noninvasive radiological characterization of this disposal facility and the affected area of the Columbia River shoreline was conducted. This characterization confirmed that skyshine is the cause of the elevated shoreline exposure rates and provided a model that could be used to rate the effectiveness of alternative interim stabilization measures. 4 refs., 5 figs.« less

  5. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri. [Hazelwood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  6. A nurse led model of chronic disease care - an interim report.

    PubMed

    Eley, Diann S; Del Mar, Chris B; Patterson, Elizabeth; Synnott, Robyn L; Baker, Peter G; Hegney, Desley

    2008-12-01

    Chronic condition management in general practice is projected to account for 50% of all consultations by 2051. General practices under present workforce conditions will be unable to meet this demand. Nurse led collaborative care models of chronic disease management have been successful overseas and are proposed as one solution. This article provides an interim report on a prospective randomised trial to investigate the acceptability, cost effectiveness and feasibility of a nurse led model of care for chronic conditions in Australian general practice. A qualitative study focused on the impact of this model of care through the perceptions of practice staff from one urban and one regional practice in Queensland, and one Victorian rural practice. Primary benefits of the collaborative care model focused on increased efficiency and communication between practice staff and patients. The increased degree of patient self responsibility was noted by all and highlights the motivational aspect of chronic disease management.

  7. Project ARTEMIS. High Power Acoustic Source. Interim Report on Acoustic Performance (Second)

    DTIC Science & Technology

    1961-09-19

    DIVISION 19 September 1961 0 OCT 25, 977 H • •€ US. N•ATAL RESEARICH LADO RATORY• ’• ? 7: .•....• ~•,. .c. ,,,- WabGgt u D.C. UIW 12O8"StjI -J1--; 0, rot...trans- ducer eleiments. Minor var-Atiens in displacement roused by differ- ences in individual elementt or by normal pressure patterns, would be

  8. Development of Human Resources through a Vocationally Oriented Education Program for Disadvantaged Families in Depressed Rural Areas. Interim Report No. 2.

    ERIC Educational Resources Information Center

    Fuller, Gerald R.; Phipps, Lloyd J.

    One aspect of Project REDY (Rural Education-Disadvantaged Youth) was to explore the degree of upward social and occupational mobility which society might realiztically expect from residents of a rural economically depressed area. Social class structure was identified as a related factor and examined in a rural, Southern Illinois county. It was…

  9. Accountability for Educators to Students. July 1, 1972 to June 30, 1973. Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Saint Elizabeth School District R-4, MO.

    The two objectives of this accountability project carried out in St. Elizabeth School District, Mo., were: (a) to increase the average student achievement by at least 5 percent at each level K-12 in the four basic areas of language arts, mathematics, social studies, and science during the 1972-73 school term as measured by scores on the Stanford…

  10. AN EXPLORATORY INVESTIGATION OF SELECTED STUDENT TYPES AT THREE UNIVERSITY OF CALIFORNIA CAMPUSES, A PRELIMINARY REPORT.

    ERIC Educational Resources Information Center

    MOCK, KATHLEEN; AND OTHERS

    A CONCERN OVER THE LOSS OF POTENTIALLY CAPABLE STUDENTS LED RESEARCH PERSONNEL ON THE DAVIS, LOS ANGELES, AND SANTA BARBARA CAMPUSES OF THE UNIVERSITY OF CALIFORNIA TO JOIN FORCES IN A STUDY TO IDENTIFY WAYS FOR ACCOMMODATING THE VARIOUS TYPES OF STUDENTS ADMITTED TO THE THREE SCHOOLS. A 2-YEAR PROJECT WAS PLANNED. THIS INTERIM REPORT COVERED A…

  11. High Temperature Superconducting State in Metallic Nanoclusters and Nano-Based Systems

    DTIC Science & Technology

    2011-10-01

    ac.Semenova, 1a Chernogolovka, Moscow District, Russia 142432 EOARD ISTC 09-7006 (Project Number 4084p) October 2011 Interim Report for 01...Nano-Based Systems 5a. CONTRACT NUMBER ISTC Registration No: 4084p 5b. GRANT NUMBER ISTC 09-7006 5c. PROGRAM ELEMENT NUMBER 6...Keywords: Superconductivity, tunneling, creep, resonance tunneling, clusters, nets, fluctuations, phase transitions. ISTC № 4084p

  12. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  13. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  14. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  15. Sensitivity Analysis for Multidisciplinary Systems (SAMS)

    DTIC Science & Technology

    2016-12-01

    support both mode-based structural representations and time-dependent, nonlinear finite element structural dynamics. This interim report describes...Adaptation, & Sensitivity Toolkit • Elasticity, heat transfer, & compressible flow • Adjoint solver for sensitivity analysis • High-order finite elements ...PROGRAM ELEMENT NUMBER 62201F 6. AUTHOR(S) Richard D. Snyder 5d. PROJECT NUMBER 2401 5e. TASK NUMBER N/A 5f. WORK UNIT NUMBER Q1FS 7

  16. Model Estimation Using Ridge Regression with the Variance Normalization Criterion. Interim Report No. 2. The Education and Inequality in Canada Project.

    ERIC Educational Resources Information Center

    Lee, Wan-Fung; Bulcock, Jeffrey Wilson

    The purposes of this study are: (1) to demonstrate the superiority of simple ridge regression over ordinary least squares regression through theoretical argument and empirical example; (2) to modify ridge regression through use of the variance normalization criterion; and (3) to demonstrate the superiority of simple ridge regression based on the…

  17. Oxidation and gum formation in diesel fuels. Interim technical report, May-December 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mayo, F.R.

    1985-12-20

    This Report describes experiments on oxidation and gum formation from n-dodecane, tetralin, and several diesel fuels at 43, 60, and 100 C, with and without added initiators, t-butyl peroxide and 2,2'azobis(2-methylpropionitrile) (ABN). Experiments on gum determination and a manuscript for publication, Gum and Deposit Formation from Jet Turbine and Diesel Fuels at 100 C, are included. One objective of work on this Contract is to relate oxidations of diesel fuels at 100 and 130 C, where experiments can be performed in hours or days, to standard tests for fuel stability at ambient temperatures and 43.3 C (110 F), which requiremore » many weeks. A second objective is to devise a fast test for fuel stability.« less

  18. The roles of static stability and tropical-extratropical interactions in the summer interannual variability of the North Atlantic sector

    NASA Astrophysics Data System (ADS)

    Mbengue, Cheikh Oumar; Woollings, Tim; Dacre, Helen F.; Hodges, Kevin I.

    2018-04-01

    Summer seasonal forecast skill in the North Atlantic sector is lower than winter skill. To identify potential controls on predictability, the sensitivity of North Atlantic baroclinicity to atmospheric drivers is quantified. Using ERA-INTERIM reanalysis data, North Atlantic storm-track baroclinicity is shown to be less sensitive to meridional temperature-gradient variability in summer. Static stability shapes the sector's interannual variability by modulating the sensitivity of baroclinicity to variations in meridional temperature gradients and tropopause height and by modifying the baroclinicity itself. High static stability anomalies at upper levels result in more zonal extratropical cyclone tracks and higher eddy kinetic energy over the British Isles in the summertime. These static stability anomalies are not strongly related to the summer NAO; but they are correlated with the suppression of convection over the tropical Atlantic and with a poleward-shifted subtropical jet. These results suggest a non-local driver of North Atlantic variability. Furthermore, they imply that improved representations of convection over the south-eastern part of North America and the tropical Atlantic might improve summer seasonal forecast skill.

  19. Stability of athlete blood passport parameters during air freight.

    PubMed

    Ashenden, M; Sharpe, K; Plowman, J; Allbon, G; Lobigs, L; Baron, A; Gore, C J

    2014-10-01

    Fluctuations in ambient temperature and pressure, as well as physical jostling, may affect the stability of whole blood samples transported by air freight. The aim of this study was to characterize the stability of key blood variables during air freight and to investigate whether vibration or reduced pressure alone affected results. Over a 72-h interval, we evaluated the stability of full blood count indices (plus reticulocytes) in tubes that were air-freighted a total of 2, 10 and 28 h. We also examined the impact of 24 h of reduced atmospheric pressure (750 hpa or approximately 2500 m.a.s.l) and vibration (5 Hz). Samples were measured on a Sysmex XT-2000i instrument. The two key variables in the context of antidoping (haemoglobin concentration, reticulocytes) remained stable over a 72-h period regardless of the duration of air freight. Atmospheric pressure and vibration had no discernible effect. Whole blood samples stored in NanoCool devices can be relied upon to remain stable for at least 72 h despite interim air freight. © 2013 John Wiley & Sons Ltd.

  20. Highway planning and operations for the Dallas district: Implementation and evaluation of concurrent flow HOV lanes in Texas. Project summary report 1994-14S, September 1996--August 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Skowronek, D.A.; Stoddard, A.M.; Ranft, S.E.

    1997-11-01

    Limited capital investment for major transportation improvements and growth in metropolitan areas require the most efficient use of the existing transportation system. One means to achieve this is high-occupancy vehicle (HOV) lanes. While an extensive system of permanent HOV lanes is planned for the Dallas-Fort Worth urbanized area, the Texas Department of Transportation (TxDOT) and Dallas Area Rapid Transit (DART) have pursued and continue to pursue short-term or interim HOV lane projects that would enhance public transportation and overall mobility. There are currently 57 km (35.4 mi) of interim HOV lanes operational in the Dallas area, including a barrier-separated contraflowmore » lane on I-30 (East R.L. Thornton Freeway) and buffer-separated concurrent flow HOV lanes on I-35E North (Stemmons Freeway) and I-635 (Lyndon B. Johnson Freeway). The objective of this research is to investigate the operational effectiveness of concurrent flow (buffer-separated) versus contraflow (barrier-separated) HOV lanes. Issues such as person movement, carpool formation, travel time savings, violation rates, and project cost effectiveness are addressed. By understanding the operational performance and issues of both concurrent flow (buffer-separated) HOV lanes and contraflow (barrier-separated) HOV lanes, recommendations can be made on suggested HOV lane policies, including the type of permanent HOV lanes to be implemented in the Dallas area.« less

  1. Interim prostacyclin therapy for an isolated disconnected pulmonary artery: a case report

    PubMed Central

    2010-01-01

    Introduction Disconnected pulmonary arteries are unusual and may result in pulmonary hypertension with acute right heart failure. Case presentation We report a case of a three-month-old Asian girl who presented with heart failure and severe pulmonary hypertension due to a disconnected right pulmonary artery. An epoprostenol (prostacyclin) infusion was instrumental in lowering pulmonary artery pressures and stabilizing the child prior to surgery. Conclusions This is, to the best of our knowledge, the first report of successful prostacyclin usage in such a situation. PMID:20525186

  2. The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voegele, Michael D.; Vieth, Donald

    2013-07-01

    The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should bemore » implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)« less

  3. Mathematical Techniques for Nonlinear System Theory.

    DTIC Science & Technology

    1978-01-01

    4. TITLE (and Subtitle) 5. TYPE OF REPORT 6 PERIOD COVERED MATHEMATICAL TECHNIQUES FOR NONLINEAR SYSTEM THEORY Interim 6...ADDRESS 10. PROGRAM ELEMENT. PROJECT . TASK AREA & WORK UNIT NUMBERS Unlvers].ty of Flori.da Center for Mathematical System Theory ~~~~ Gainesville , FL...rings”, Mathematical System Theory , 9: 327—344. E. D. SONTAG (1976b1 “Linear systems over commutative rings: a survey”, Richerche di Automatica, 7: 1-34

  4. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan... notified the MPO and DOT; and (10) VOC, SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator... effect in the analysis year, except that regulatory TCMs may not be assumed to begin at a future time...

  5. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of

  6. An Analysis of the Survey of Schools of Education on Use of Data in Their Teacher Preparation Programs: An Interim Report

    ERIC Educational Resources Information Center

    WestEd, 2013

    2013-01-01

    This report documents the work of one component of a larger research effort. The objective of the project is to understand what schools of education are doing to prepare teachers to use data in their practice. The issue is multifaceted, complex, and systemic. Schools of education do not act alone to suddenly introduce courses on data-driven…

  7. Grout Isolation and Stabilization of Structures and Materials within Nuclear Facilities at the U.S. Department of Energy, Hanford Site, Summary - 12309

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phillips, S.J.; Phillips, M.; Etheridge, D.

    2012-07-01

    Per regulatory agreement and facility closure design, U.S. Department of Energy Hanford Site nuclear fuel cycle structures and materials require in situ isolation in perpetuity and/or interim physicochemical stabilization as a part of final disposal or interim waste removal, respectively. To this end, grout materials are being used to encase facilities structures or are being incorporated within structures containing hazardous and radioactive contaminants. Facilities where grout materials have been recently used for isolation and stabilization include: (1) spent fuel separations, (2) uranium trioxide calcining, (3) reactor fuel storage basin, (4) reactor fuel cooling basin transport rail tanker cars and casks,more » (5) cold vacuum drying and reactor fuel load-out, and (6) plutonium fuel metal finishing. Grout components primarily include: (1) portland cement, (2) fly ash, (3) aggregate, and (4) chemical admixtures. Mix designs for these typically include aggregate and non aggregate slurries and bulk powders. Placement equipment includes: (1) concrete piston line pump or boom pump truck for grout slurry, (2) progressive cavity and shearing vortex pump systems, and (3) extendable boom fork lift for bulk powder dry grout mix. Grout slurries placed within the interior of facilities were typically conveyed utilizing large diameter slick line and the equivalent diameter flexible high pressure concrete conveyance hose. Other facilities requirements dictated use of much smaller diameter flexible grout conveyance hose. Placement required direct operator location within facilities structures in most cases, whereas due to radiological dose concerns, placement has also been completed remotely with significant standoff distances. Grout performance during placement and subsequent to placement often required unique design. For example, grout placed in fuel basin structures to serve as interim stabilization materials required sufficient bearing i.e., unconfined compressive strength, to sustain heavy equipment yet, low breakout force to permit efficient removal by track hoe bucket or equivalent construction equipment. Further, flow of slurries through small orifice geometries of moderate head pressures was another typical design requirement. Phase separation of less than 1 percent was a typical design requirement for slurries. On the order of 30,000 cubic meters of cementitious grout have recently been placed in the above noted U.S. Department of Energy Hanford Site facilities or structures. Each has presented a unique challenge in mix design, equipment, grout injection or placement, and ultimate facility or structure performance. Unconfined compressive and shear strength, flow, density, mass attenuation coefficient, phase separation, air content, wash-out, parameters and others, unique to each facility or structure, dictate the grout mix design for each. Each mix design was tested under laboratory and scaled field conditions as a precursor to field deployment. Further, after injection or placement of each grout formulation, the material was field inspected either by standard laboratory testing protocols, direct physical evaluation, or both. (authors)« less

  8. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  9. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  10. Interim 2003-based national population projections for the United Kingdom and constituent countries.

    PubMed

    Shaw, Chris

    2004-01-01

    The 2003-based national population projections, carried out by the Government Actuary in consultation with the Registrars General, and using essentially the same underlying assumptions as for the previous 2002-based projections, show the population of the United Kingdom rising from 59.6 million in 2003, passing 60 million during 2005, to reach 65.7 million by 2031. Longer-term projections suggest the population will peak around 2050 at nearly 67 million and then very gradually start to fall. The population will become older with the median age expected to rise from 38.4 years in 2003 to 43.3 years by 2031. In 2003, there were around 700 thousand (six per cent) more children aged under 16, than people of state pensionable age. However, from 2007, the population of pensionable age is projected to exceed the number of children.

  11. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  12. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...

  13. 7 CFR 1980.451 - Filing and processing applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... categories, and their point scores, are: (A) Project will contribute to the overall economic stability of the... points). (B) Project will contribute to the overall economic stability of the project area and will...'s economy (20 points). (C) Project will contribute to the overall economic stability of the project...

  14. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...

  15. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...

  16. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  17. The atmospheric effects of stratospheric aircraft: A fourth program report

    NASA Technical Reports Server (NTRS)

    Stolarski, Richard S. (Editor); Wesoky, Howard L. (Editor); Wofsy, Steven C.; Ravishankara, A. R.; Rodriguez, Jose M.; Grose, William L.

    1995-01-01

    This document presents the fourth report from the Atmospheric Effects of Stratospheric Aircraft (AESA) component of NASA's High-Speed Research Program (HSRP). Market and technology considerations continue to provide an impetus for high-speed civil transport research. A recent AESA interim assessment report and a review of that report have shown that considerable uncertainty still exists about the possible impact of aircraft on the atmosphere. The AESA has been designed to develop the body of scientific knowledge necessary for the evaluation of the impact of stratospheric aircraft on the atmosphere. The first Program report presented the basic objectives and plans for AESA. This fourth report comes after the interim assessment and sets forth directions for the 1995 assessment at the end of AESA Phase 1. It also sets forth the goals and directions for AESA Phase 2, as reported at the 1994 Atmospheric Effects of Aviation Project (AEAP) annual meeting held in June. The focus of the Phase 2 effort is to obtain the best possible closure on the outstanding problems identified in the interim assessment and NASA/NRC review. Topics discussed in this report include how high-speed civil transports (HSCT) might affect stratospheric ozone, emissions scenarios and databases to assess potential atmospheric effects from HSCT's, calculated results from 2-D zonal mean models using emissions data, engine trace constituent measurements.

  18. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  19. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...

  20. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...

  1. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  2. Oral Historical, Documentary, and Archaeological Investigations of Barton and Vinton, Mississippi: An Interim Report on Phase II of the Tombigbee Historic Townsites Project.

    DTIC Science & Technology

    1983-05-01

    Nirwerly Contribu~tions 6b- Leah Allen 11. itcpAk;i McBr&-de W. Lei Nfilijfl, Miltun B. Newtoni Rohcrl C.. Sonder-lari W n ;, Va , 3 r . .Ai𔃾 tht...the Tombigbee Historic Townmsites Project -____ 7. Am1A I\\ akwon O"Uef"Z5SE6 now. 146. W. Lee Minnerly, et.aI. r pooemsag GCeavlIO ftevne .. .^"#va.C P...13 ’ Results . . . . . . . . . . . . . . . . . . . .. . 115 I I r w . -w~~~~7 - .1 -. 1 u- - - - - - Site and Unit Descriptions

  3. Diffuse Large B-Cell Lymphoma: Prospective Multicenter Comparison of Early Interim FLT PET/CT versus FDG PET/CT with IHP, EORTC, Deauville, and PERCIST Criteria for Early Therapeutic Monitoring

    PubMed Central

    Minamimoto, Ryogo; Fayad, Luis; Advani, Ranjana; Vose, Julie; Macapinlac, Homer; Meza, Jane; Hankins, Jordan; Mottaghy, Felix; Juweid, Malik

    2016-01-01

    Purpose To compare the performance characteristics of interim fluorine 18 (18F) fluorodeoxyglucose (FDG) positron emission tomography (PET)/computed tomography (CT) (after two cycles of chemotherapy) by using the most prominent standardized interpretive criteria (including International Harmonization Project [IHP] criteria, European Organization for Research and Treatment of Cancer [EORTC] criteria, and PET Response Criteria in Solid Tumors (PERCIST) versus those of interim 18F fluorothymidine (FLT) PET/CT and simple visual interpretation. Materials and Methods This HIPAA-compliant prospective study was approved by the institutional review boards, and written informed consent was obtained. Patients with newly diagnosed diffuse large B-cell lymphoma (DLBCL) underwent both FLT and FDG PET/CT 18–24 days after two cycles of rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisone or rituximab, etoposide, prednisone, vincristine, cyclophosphamide, and doxorubicin. For FDG PET/CT interpretation, IHP criteria, EORTC criteria, PERCIST, Deauville criteria, standardized uptake value, total lesion glycolysis, and metabolic tumor volume were used. FLT PET/CT images were interpreted with visual assessment by two reviewers in consensus. The interim (after cycle 2) FDG and FLT PET/CT studies were then compared with the end-of-treatment FDG PET/CT studies to determine which interim examination and/or criteria best predicted the result after six cycles of chemotherapy. Results From November 2011 to May 2014, there were 60 potential patients for inclusion, of whom 46 patients (24 men [mean age, 60.9 years ± 13.7; range, 28–78 years] and 22 women [mean age, 57.2 years ± 13.4; range, 25–76 years]) fulfilled the criteria. Thirty-four patients had complete response, and 12 had residual disease at the end of treatment. FLT PET/CT had a significantly higher positive predictive value (PPV) (91%) in predicting residual disease than did any FDG PET/CT interpretation method (42%–46%). No difference in negative predictive value (NPV) was found between FLT PET/CT (94%) and FDG PET/CT (82%–95%), regardless of the interpretive criteria used. FLT PET/CT showed statistically higher (P < .001–.008) or similar NPVs than did FDG PET/CT. Conclusion Early interim FLT PET/CT had a significantly higher PPV than standardized FDG PET/CT–based interpretation for therapeutic response assessment in DLBCL. © RSNA, 2016 Online supplemental material is available for this article. PMID:26854705

  4. 12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...

  5. Brown continues crusade against earmarking

    NASA Astrophysics Data System (ADS)

    Leath, Audrey T.

    House Science Committee Chairman George Brown (D-Calif.), a crusader against earmarking of academic research and facilities, continues his efforts to raise the subject's visibility with a new report that was released on August 9."Academic Earmarks: An Interim Report by the Chairman of the Committee on Science, Space, and Technology" includes preliminary results of a survey of about fifty institutions receiving recent earmarks and offers a trio of recommendations to help stem the flood of unauthorized projects.

  6. Developing Awareness of Disability in the World: Looking at Issues Relevant to Disability in Asia, the Pacific, and Africa through the Eyes of U.S. Fellows. Monograph #54.

    ERIC Educational Resources Information Center

    World Rehabilitation Fund, Inc., New York, NY.

    This document provides information about the 1990-93 overseas fellowships of the International Exchange of Experts and Information in Rehabilitation (IEEIR), based on project summaries and reports from fellows and hosts. It begins with an interim report from an IEEIR fellow who traveled to Australia and a letter from a host in New Zealand. The…

  7. Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation.

    DTIC Science & Technology

    1982-06-01

    these conditions . Therefore, the no-action plan is not being recommended. With the present channel conditions and anticipated slow growth for... conditions very similar to those of today. No ocean disposal is anticipated. Because no significant growth in socioeconomic activity is expected without...accuracy; however, project construction provides conditions favorable for growth . The service industry would be expected to closely follow any increase

  8. Aircrew Training Devices: Utility and Utilization of Advanced Instructional Features (Phase II-Air Training Command, Military Airlift Command, and Strategic Air Command [and] Phase III-Electronic Warfare Trainers).

    ERIC Educational Resources Information Center

    Polzella, Donald J.; Hubbard, David C.

    This document consists of an interim report and a final report which describe the second and third phases of a project designed to determine the utility and utilization of sophisticated hardware and software capabilities known as advanced instructional features (AIFs). Used with an aircrew training device (ATD), AIFs permit a simulator instructor…

  9. Understanding War in Afghanistan

    DTIC Science & Technology

    2011-01-01

    CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ...ways of building up or working around a skeletal, low- performing interim Afghan government. The latter proved to be easier, but that caused another...ORGANIZATION NAME(S) AND ADDRESS(ES) National Defense University,260 6th Avenue Ft. Lesley J. McNair,Washington,DC,20319 8. PERFORMING ORGANIZATION

  10. Benchmarking and Its Relevance to the Library and Information Sector. Interim Findings of "Best Practice Benchmarking in the Library and Information Sector," a British Library Research and Development Department Project.

    ERIC Educational Resources Information Center

    Kinnell, Margaret; Garrod, Penny

    This British Library Research and Development Department study assesses current activities and attitudes toward quality management in library and information services (LIS) in the academic sector as well as the commercial/industrial sector. Definitions and types of benchmarking are described, and the relevance of benchmarking to LIS is evaluated.…

  11. Iraq Reconstruction: Lessons in Program and Project Management

    DTIC Science & Technology

    2007-03-01

    Interim Government ( IIG ). The U.S. Mission-Iraq concomi- tantly took the lead in reconstruction management, and the Iraq Reconstruction Management...completed.85 There was limited capacity to provide oversight of these transactions . One offi- cial noted that the overarching goal was to get Iraqis back to...program decreased in November 2003 when the USG decided to transition responsibility to the IIG by June 30, 2004. This decision forced the CPA to

  12. Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study Fort Sheridan, Illinois, Volume 1.

    DTIC Science & Technology

    1995-03-15

    billion volume ppm parts per million PT pole-mounted PTFE polytetrafluoro-ethylene PUF polyurethane foam PVC polyvinyl chloride QA quality assurance...and Illinois Environmental Protection Agency (IEPA) quality assurance (QA) objectives. The format of the OQAPP is based on "Interim Guidelines and...County. The till material deposited in the Fort Sheridan region has been classified as the Wadsworth Till Member of the Wedron Formation . This till

  13. Application of fuzzy logic-neural network based reinforcement learning to proximity and docking operations

    NASA Technical Reports Server (NTRS)

    Jani, Yashvant

    1992-01-01

    As part of the Research Institute for Computing and Information Systems (RICIS) activity, the reinforcement learning techniques developed at Ames Research Center are being applied to proximity and docking operations using the Shuttle and Solar Max satellite simulation. This activity is carried out in the software technology laboratory utilizing the Orbital Operations Simulator (OOS). This interim report provides the status of the project and outlines the future plans.

  14. TTI CM/AQ evaluation model user`s guide and workshop training materials. Interim research report, September 1993-August 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The TTI CM/AQ Evaluation Model evaluates potential projects based on the following criteria: eligibility, travel impacts, emission impacts, and cost-effectiveness. To compare independent projects within a region during the decision process for CM/AQ funding, each project evaluated with this model is given an overall score based on the project`s effects for the criteria listed above. Training workshops were held by TTI in the first quarter of 1995 to teach metropolitan planning organization, state department of transportation, and regional air quality organization staff how to use this model. Basics of sketch-planning applications were also taught. The DRCOG and TTI CM/AQ Evaluationmore » Models represent significant steps toward the development of analytical methodologies for selecting projects for CM/AQ funding. Because the needs of nonattainment and attainment areas change over time, this model is particularly useful as key evaluation criteria can be modified to reflect the changing needs of a metropolitan area.« less

  15. The highs and lows of cloud radiative feedback: Comparing observational data and CMIP5 models

    NASA Astrophysics Data System (ADS)

    Jenney, A.; Randall, D. A.

    2014-12-01

    Clouds play a complex role in the climate system, and remain one of the more difficult aspects of the future climate to predict. Over subtropical eastern ocean basins, particularly next to California, Peru, and Southwest Africa, low marine stratocumulus clouds (MSC) help to reduce the amount of solar radiation that reaches the surface by reflecting incident sunlight. The climate feedback associated with these clouds is thought to be positive. This project looks at CMIP5 models and compares them to observational data from CERES and ERA-Interim to try and find observational evidence and model agreement for low, marine stratocumulus cloud feedback. Although current evidence suggests that the low cloud feedback is positive (IPCC, 2014), an analysis of the simulated relationship between July lower tropospheric stability (LTS) and shortwave cloud forcing in MSC regions suggests that this feedback is not due to changes in LTS. IPCC, 2013: Climate Change 2013: The Physical Science Basis. Contribution of Working Group I to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change [Stocker, T.F., D. Qin, G.-K. Plattner, M. Tignor, S.K. Allen, J. Boschung, A. Nauels, Y. Xia, V. Bex and P.M. Midgley (eds.)]. Cambridge University Press, Cambridge, United Kingdom and New York, NY, USA, 1535 pp.

  16. Development studies for a novel wet oxidation process. Phase 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-07-01

    DETOX{sup SM} is a catalyzed wet oxidation process which destroys organic materials in an acidic water solution of iron at 373 to 473 K. The solution can be used repeatedly to destroy great amounts of organic materials. Since the process is conducted in a contained vessel, air emissions from the process can be well controlled. The solution is also capable of dissolving and concentrating many heavy and radioactive metals for eventual stabilization and disposal. The Phase 2 effort for this project is site selection and engineering design for a DETOX demonstration unit. Site selection was made using a set ofmore » site selection criteria and evaluation factors. A survey of mixed wastes at DOE sites was conducted using the Interim Mixed Waste Inventory Report. Sites with likely suitable waste types were identified. Potential demonstration sites were ranked based on waste types, interest, regulatory needs, scheduling, ability to provide support, and available facilities. Engineering design for the demonstration unit is in progress and is being performed by Jacobs Applied Technology. The engineering design proceeded through preliminary process flow diagrams (PFDs), calculation of mass and energy balances for representative waste types, process and instrumentation diagrams (P and IDs), preparation of component specifications, and a firm cost estimate for fabrication of the demonstration unit.« less

  17. The capacity of aquatic macrophytes for phytoremediation and their disposal with specific reference to water hyacinth.

    PubMed

    Newete, Solomon W; Byrne, Marcus J

    2016-06-01

    The actual amount of fresh water readily accessible for use is <1 % of the total amount of water on earth, and is expected to shrink further due to the projected growth of the population by a third in 2050. Worse yet are the major issues of water pollution, including mining and industrial waste which account for the bulk of contamination sources. The use of aquatic macrophytes as a cost-effective and eco-friendly tool for phytoremediation is well documented. However, little is known about the fate of those plants after phytoremediation. This paper reviews the options for safe disposal of waste plant biomass after phytoremediation. Among the few mentioned in the literature are briquetting, incineration and biogasification. The economic viability of such processes and the safety of their economic products for domestic use are however, not yet established. Over half of the nations in the world are involved in mining of precious metals, and tailings dams are the widespread legacy of such activities. Thus, the disposal of polluted plant biomass onto mine storage facilities such as tailing dams could be an interim solution. There, the material can act as mulch for the establishment of stabilizing vegetation and suppress dust. Plant decomposition might liberate its contaminants, but in a site where containment is a priority.

  18. 76 FR 14559 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...

  19. Interim Administrators in Higher Education: A National Study

    ERIC Educational Resources Information Center

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  20. Extraction-Scrub-Strip test results from the interim Salt Disposition Program Macrobatch 9 Tank 21H qualification samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T.

    2016-02-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). The Salt Batch 9 characterization results were previously reported. An Extraction-Scrub-Strip (ESS) test was performed to determine cesium distribution ratios (D (Cs)) and cesium concentration in the strip effluent and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a blend solvent prepared by SRNL that mimics the solvent composition currently being used atmore » the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D (Cs) value of 52.4. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This compares well against the predicted value of 56.5 from a recently created D (Cs) model« less

  1. Extraction, -scrub, -strip test results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modularmore » Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.« less

  2. Methods and system for subsurface stabilization using jet grouting

    DOEpatents

    Loomis, Guy G.; Weidner, Jerry R.; Farnsworth, Richard K.; Gardner, Bradley M.; Jessmore, James J.

    1999-01-01

    Methods and systems are provided for stabilizing a subsurface area such as a buried waste pit for either long term storage, or interim storage and retrieval. A plurality of holes are drilled into the subsurface area with a high pressure drilling system provided with a drill stem having jet grouting nozzles. A grouting material is injected at high pressure through the jet grouting nozzles into a formed hole while the drill stem is withdrawn from the hole at a predetermined rate of rotation and translation. A grout-filled column is thereby formed with minimal grout returns, which when overlapped with other adjacent grout-filled columns encapsulates and binds the entire waste pit area to form a subsurface agglomeration or monolith of grout, soil, and waste. The formed monolith stabilizes the buried waste site against subsidence while simultaneously providing a barrier against contaminate migration. The stabilized monolith can be left permanently in place or can be retrieved if desired by using appropriate excavation equipment. The jet grouting technique can also be utilized in a pretreatment approach prior to in situ vitrification of a buried waste site. The waste encapsulation methods and systems are applicable to buried waste materials such as mixed waste, hazardous waste, or radioactive waste.

  3. Dissolution of cement, root caries, fracture, and retrofit of post and cores.

    PubMed

    Rosen, H

    1998-10-01

    Fixed partial denture abutments severely damaged by dental caries or fracture present a challenge to the dentist. The fixed partial denture may need to be removed for endodontic treatment with post and core fabrication. Frequently, the existing fixed partial denture can be recycled as a provisional restoration. Retrofitting the post and core greatly improves the stabilization of the interim as well as the remake of the definitive fixed partial denture. This article describes a chair side procedure for retrofitting posts and cores and, at the same appointment, converting the original fixed partial denture to an effective provisional restoration.

  4. EMSO ERIC - Ocean Consortium Facility for Europe and the World

    NASA Astrophysics Data System (ADS)

    Best, Mairi

    2017-04-01

    EMSO is forging ahead through the next challenge in Earth-Ocean Science: How to co-ordinate ocean data acquisition, analysis and response across provincial, national, regional, and global scales. EMSO provides power, communications, sensors, and data infrastructure for continuous, high resolution, real-time, interactive ocean observations across a truly multi- and interdisciplinary range of research areas including biology, geology, chemistry, physics, engineering, and computer science; from polar to tropical environments, through the water column down to the abyss. 11 deep sea and 4 shallow nodes span from Arctic through the Atlantic and Mediterranean, to the Black Sea. The EMSO Preparatory Phase (FP7) project led to the Interim phase (involving 13 countries) of forming the legal entity: the EMSO European Research Infrastructure Consortium (EMSO-ERIC)-officially created by the EC in 2016. The open user community, originally developed through ESONET (European Seafloor Observatory NETwork), follows on scientific community planning contributions of the ESONET-NoE (FP6) project. Further progress made through the FixO3 project (FP7) also contributes to this shared infrastructure. Coordination among nodes is being strengthened through the EMSOdev project (H2020) which is producing the EMSO Generic Instrument Module (EGIM) - standardised observations of temperature, pressure, salinity, dissolved oxygen, turbidity, chlorophyll fluorescence, currents, passive acoustics, pH, pCO2, and nutrients. Early installations are now being upgraded; in October 2015 EMSO-France deployed a second cable and junction box serving the Ligurian Sea Node in order to monitor slope stability offshore Nice; in 2016 the EMSO Azores Node receives a major upgrade that will double its observing capacity; for EMSO-Italia the Capo Passero site is being installed and the Catania site is being upgraded. EMSOLINK will continue the expansion work. EMSO is a key player in international coordination projects such as CoopEUS/Coop+, ENVRI/ENVRIplus, GOOS/EOOS - as such EMSO not only brings together countries and disciplines, but allows the pooling of resources and coordination to assemble harmonised data into a comprehensive regional ocean picture which it will then make available to researchers and stakeholders worldwide on an open and interoperable access basis.

  5. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP)more » for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.« less

  6. Radiation and Thermal Effects on Used Nuclear Fuel and Nuclear Waste Forms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weber, William J.; Zhang, Yanwen

    This is the final report of the NEUP project “Radiation and Thermal Effects on Used Nuclear Fuel and Nuclear Waste Forms.” This project started on July 1, 2012 and was successfully completed on June 30, 2016. This report provides an overview of the main achievements, results and findings through the duration of the project. Additional details can be found in the main body of this report and in the individual Quarterly Reports and associated Deliverables of this project, which have been uploaded in PICS-NE. The objective of this research was to advance understanding and develop validated models on the effectsmore » of self-radiation from beta and alpha decay on the response of used nuclear fuel and nuclear waste forms during high-temperature interim storage and long-term permanent disposition. To achieve this objective, model used-fuel materials and model waste form materials were identified, fabricated, and studied.« less

  7. Patient Protection and Affordable Care Act; program integrity: exchange, premium stabilization programs, and market standards; amendments to the HHS notice of benefit and payment parameters for 2014. Final rule.

    PubMed

    2013-10-30

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act). Specifically, this final rule outlines financial integrity and oversight standards with respect to Affordable Insurance Exchanges, qualified health plan (QHP) issuers in Federally-facilitated Exchanges (FFEs), and States with regard to the operation of risk adjustment and reinsurance programs. It also establishes additional standards for special enrollment periods, survey vendors that may conduct enrollee satisfaction surveys on behalf of QHP issuers, and issuer participation in an FFE, and makes certain amendments to definitions and standards related to the market reform rules. These standards, which include financial integrity provisions and protections against fraud and abuse, are consistent with Title I of the Affordable Care Act. This final rule also amends and adopts as final interim provisions set forth in the Amendments to the HHS Notice of Benefit and Payment Parameters for 2014 interim final rule, published in the Federal Register on March 11, 2013, related to risk corridors and cost-sharing reduction reconciliation.

  8. Brown continues crusade against earmarking

    NASA Astrophysics Data System (ADS)

    Leath, Audrey T.

    House Science Committee Chairman George Brown (D-Calif.), a crusader against earmarking of academic research and facilities, continues his efforts to raise the subject's visibility with a new report that was released on August 9.“Academic Earmarks: An Interim Report by the Chairman of the Committee on Science, Space, and Technology” includes preliminary results of a survey of about fifty institutions receiving recent earmarks and offers a trio of recommendations to help stem the flood of unauthorized projects.

  9. 40 CFR 93.109 - Criteria and procedures for determining conformity of transportation plans, programs, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) through (k) of this section explain when the budget, interim emissions, and hot-spot tests are required... § 93.115 Project from a conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10... Currently conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10 and PM2.5 control...

  10. 40 CFR 93.109 - Criteria and procedures for determining conformity of transportation plans, programs, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) through (k) of this section explain when the budget, interim emissions, and hot-spot tests are required... § 93.115 Project from a conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10... Currently conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10 and PM2.5 control...

  11. JPRS Report, Near East & South Asia

    DTIC Science & Technology

    1987-08-03

    Range (NTR) at Baliapal in coas- tal Balasore district has assumed a new dimension with the disclo- sure by the defence ministry this week that the...ongoing Interim Test Range (ITR) project at Chandipur, near Balasore , is part of the NTR. The people of Baliapal got powerful support from the...peo- ple of Balasore town, which observed a total bandh on June 1 in protest against the location of the ITR at Chandipur, which is only 3 kms

  12. MERRA/AS: The MERRA Analytic Services Project Interim Report

    NASA Technical Reports Server (NTRS)

    Schnase, John; Duffy, Dan; Tamkin, Glenn; Nadeau, Denis; Thompson, Hoot; Grieg, Cristina; Luczak, Ed; McInerney, Mark

    2013-01-01

    MERRA AS is a cyberinfrastructure resource that will combine iRODS-based Climate Data Server (CDS) capabilities with Coudera MapReduce to serve MERRA analytic products, store the MERRA reanalysis data collection in an HDFS to enable parallel, high-performance, storage-side data reductions, manage storage-side driver, mapper, reducer code sets and realized objects for users, and provide a library of commonly used spatiotemporal operations that can be composed to enable higher-order analyses.

  13. THE EFFECTIVENESS OF THREE READING APPROACHES AND AN ORAL LANGUAGE STIMULATION PROGRAM WITH DISADVANTAGED CHILDREN IN THE PRIMARY GRADES--AN INTERIM REPORT AFTER ONE YEAR OF THE COOPERATIVE READING PROJECT.

    ERIC Educational Resources Information Center

    DUNN, LLOYD M.; AND OTHERS

    THE EFFECTIVENESS OF THREE APPROACHES TO TEACHING BEGINNING READING AND THE INFLUENCE OF AN ORAL LANGUAGE STIMULATION PROGRAM ON THE DEVELOPMENT OF DISADVANTAGED CHILDREN IS REPORTED IN THE FIRST-YEAR REPORT OF A 2-YEAR INTERVENTION STUDY. SUBJECTS WERE 608 FIRST-GRADE PUPILS FROM 12 ELEMENTARY SCHOOLS IN AN INNER-CITY AREA. THE THREE EXPERIMENTAL…

  14. The Columbia River and Tributaries Study, Interim Report, Yakima-Union Gap Flood Damage Reduction, Yakima River Basin, Washington.

    DTIC Science & Technology

    1980-03-01

    Populus trichoearp& Shrubs Red osier dogwood Cornus stolonifera Willows Salix spp. C Elderberry Sambucus glauca C Serviceberry Amelanchier alnifolia C...Taraxucum off icinale C Madowlrue Thalictrum occidentale C Ceow prni Heracleum lanatun C Monkey flower Iiis langsdorf sii C Rocky Mountain irishi mssuins...aboaeem oil the significant aree.Ioloical resources is the project aea TO the centrary nearby are suggest that important material OWwall be loated to the

  15. Online Monitoring Technical Basis and Analysis Framework for Large Power Transformers; Interim Report for FY 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nancy J. Lybeck; Vivek Agarwal; Binh T. Pham

    The Light Water Reactor Sustainability program at Idaho National Laboratory (INL) is actively conducting research to develop and demonstrate online monitoring (OLM) capabilities for active components in existing Nuclear Power Plants. A pilot project is currently underway to apply OLM to Generator Step-Up Transformers (GSUs) and Emergency Diesel Generators (EDGs). INL and the Electric Power Research Institute (EPRI) are working jointly to implement the pilot project. The EPRI Fleet-Wide Prognostic and Health Management (FW-PHM) Software Suite will be used to implement monitoring in conjunction with utility partners: the Shearon Harris Nuclear Generating Station (owned by Duke Energy for GSUs, andmore » Braidwood Generating Station (owned by Exelon Corporation) for EDGs. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for GSUs. GSUs are main transformers that are directly connected to generators, stepping up the voltage from the generator output voltage to the highest transmission voltages for supplying electricity to the transmission grid. Technical experts from Shearon Harris are assisting INL and EPRI in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the FW-PHM Software Suite and tested using data from Shearon-Harris. Parallel research on EDGs is being conducted, and will be reported in an interim report during the first quarter of fiscal year 2013.« less

  16. A generalized multivariate regression model for modelling ocean wave heights

    NASA Astrophysics Data System (ADS)

    Wang, X. L.; Feng, Y.; Swail, V. R.

    2012-04-01

    In this study, a generalized multivariate linear regression model is developed to represent the relationship between 6-hourly ocean significant wave heights (Hs) and the corresponding 6-hourly mean sea level pressure (MSLP) fields. The model is calibrated using the ERA-Interim reanalysis of Hs and MSLP fields for 1981-2000, and is validated using the ERA-Interim reanalysis for 2001-2010 and ERA40 reanalysis of Hs and MSLP for 1958-2001. The performance of the fitted model is evaluated in terms of Pierce skill score, frequency bias index, and correlation skill score. Being not normally distributed, wave heights are subjected to a data adaptive Box-Cox transformation before being used in the model fitting. Also, since 6-hourly data are being modelled, lag-1 autocorrelation must be and is accounted for. The models with and without Box-Cox transformation, and with and without accounting for autocorrelation, are inter-compared in terms of their prediction skills. The fitted MSLP-Hs relationship is then used to reconstruct historical wave height climate from the 6-hourly MSLP fields taken from the Twentieth Century Reanalysis (20CR, Compo et al. 2011), and to project possible future wave height climates using CMIP5 model simulations of MSLP fields. The reconstructed and projected wave heights, both seasonal means and maxima, are subject to a trend analysis that allows for non-linear (polynomial) trends.

  17. Accord near for offshore California oil shipments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    There are faint glimmers of hope again for offshore California operators. After more than a decade of often bitter strife over offshore oil and gas development and transportation issues, state officials and oil producers may be moving toward compromise solutions. One such solution may be forthcoming on offshore development. But the real change came with the turnabout of the California Coastal Commission (CCC), which last month approved a permit for interim tankering of crude from Point Arguello oil field in the Santa Barbara Channel to Los Angeles. The dispute over how to ship offshore California crude to market has draggedmore » on since before Point Arguelo development plans were unveiled. The project's status has become a flashpoint in the U.S. debate over resource use and environmental concerns. The controversy flared anew in the wake of the 1989 Exxon Valdez tanker spill off Alaska, when CCC voided a Santa Barbara County permit for interim tankering, a move project operator Chevron Corp. linked to the Exxon Valdez accident. Faced with litigation, the state's economic devastation, and acrimonious debate over transporting California crude, Gov. Pete Wilson and other agencies approved the CCC permit. But there's a catch: A permanent pipeline must be built to handle full production within 3 years. The paper discusses permit concerns, the turnaround decision, the anger of environmental groups, and pipeline proposals.« less

  18. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...

  19. Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs

    2011-02-01

    Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) frommore » unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.« less

  20. Critical Surface Cleaning and Verification Alternatives

    NASA Technical Reports Server (NTRS)

    Melton, Donald M.; McCool, A. (Technical Monitor)

    2000-01-01

    As a result of federal and state requirements, historical critical cleaning and verification solvents such as Freon 113, Freon TMC, and Trichloroethylene (TCE) are either highly regulated or no longer 0 C available. Interim replacements such as HCFC 225 have been qualified, however toxicity and future phase-out regulations necessitate long term solutions. The scope of this project was to qualify a safe and environmentally compliant LOX surface verification alternative to Freon 113, TCE and HCFC 225. The main effort was focused on initiating the evaluation and qualification of HCFC 225G as an alternate LOX verification solvent. The project was scoped in FY 99/00 to perform LOX compatibility, cleaning efficiency and qualification on flight hardware.

  1. The implementation of the Human Exploration Demonstration Project (HEDP), a systems technology testbed

    NASA Technical Reports Server (NTRS)

    Rosen, Robert; Korsmeyer, David J.

    1993-01-01

    The Human Exploration Demonstration Project (HEDP) is an ongoing task at the NASA's Ames Research Center to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary surface habitat. The integrated environment consists of life support systems, physiological monitoring of project crew, a virtual environment work station, and centralized data acquisition and habitat systems health monitoring. The HEDP is an integrated technology demonstrator, as well as an initial operational testbed. There are several robotic systems operational in a simulated planetary landscape external to the habitat environment, to provide representative work loads for the crew. This paper describes the evolution of the HEDP from initial concept to operational project; the status of the HEDP after two years; the final facilities composing the HEDP; the project's role as a NASA Ames Research Center systems technology testbed; and the interim demonstration scenarios that have been run to feature the developing technologies in 1993.

  2. SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RUTHERFORD WW; GEUTHER WJ; STRANKMAN MR

    2009-04-29

    The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transportmore » and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is dependent on the confidence that DOE has in the long term mission for T Plant, is proposed: (1) If the confidence level in a durable, extended T Plant mission independent of sludge storage is high, then the Sludge Treatment Project (STP) would continue to implement the path forward previously described in the Alternatives Report (HNF-39744). Risks to the sludge project can be minimized through the establishment of an Interface Control Document (ICD) defining agreed upon responsibilities for both the STP and T Plant Operations regarding the transfer and storage of sludge and ensuring that the T Plant upgrade and operational schedule is well integrated with the sludge storage activities. (2) If the confidence level in a durable, extended T Plant mission independent of sludge storage is uncertain, then the ASF conceptual design should be pursued on a parallel path with preparation of T Plant for sludge storage until those uncertainties are resolved. (3) Finally, if the confidence level in a durable, extended T Plant mission independent of sludge storage is low, then the ASF design should be selected to provide independence from the T Plant mission risk.« less

  3. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    PubMed

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  4. Regional Climate Model sesitivity to different parameterizations schemes with WRF over Spain

    NASA Astrophysics Data System (ADS)

    García-Valdecasas Ojeda, Matilde; Raquel Gámiz-Fortis, Sonia; Hidalgo-Muñoz, Jose Manuel; Argüeso, Daniel; Castro-Díez, Yolanda; Jesús Esteban-Parra, María

    2015-04-01

    The ability of the Weather Research and Forecasting (WRF) model to simulate the regional climate depends on the selection of an adequate combination of parameterization schemes. This study assesses WRF sensitivity to different parameterizations using six different runs that combined three cumulus, two microphysics and three surface/planetary boundary layer schemes in a topographically complex region such as Spain, for the period 1995-1996. Each of the simulations spanned a period of two years, and were carried out at a spatial resolution of 0.088° over a domain encompassing the Iberian Peninsula and nested in the coarser EURO-CORDEX domain (0.44° resolution). The experiments were driven by Interim ECMWF Re-Analysis (ERA-Interim) data. In addition, two different spectral nudging configurations were also analysed. The simulated precipitation and maximum and minimum temperatures from WRF were compared with Spain02 version 4 observational gridded datasets. The comparison was performed at different time scales with the purpose of evaluating the model capability to capture mean values and high-order statistics. ERA-Interim data was also compared with observations to determine the improvement obtained using dynamical downscaling with respect to the driving data. For this purpose, several parameters were analysed by directly comparing grid-points. On the other hand, the observational gridded data were grouped using a multistep regionalization to facilitate the comparison in term of monthly annual cycle and the percentiles of daily values analysed. The results confirm that no configuration performs best, but some combinations that produce better results could be chosen. Concerning temperatures, WRF provides an improvement over ERA-Interim. Overall, model outputs reduce the biases and the RMSE for monthly-mean maximum and minimum temperatures and are higher correlated with observations than ERA-Interim. The analysis shows that the Yonsei University planetary boundary layer scheme is the most appropriate parameterization in term of temperatures because it better describes monthly minimum temperatures and seems to perform well for maximum temperatures. Regarding precipitation, ERA-Interim time series are slightly higher correlated with observations than WRF, but the bias and the RMSE are largely worse. These results also suggest that CAM V.5.1 2-moment 5-class microphysics schemes should not be used due to the computational cost with no apparent gain with respect to simpler schemes such as WRF single-moment 3-class. For the convection scheme, this study suggests that Betts-Miller-Janjic scheme is an appropriate choice due to its robustness and Kain-Fritsch cumulus scheme should not be used over this region. KEY WORDS: Regional climate modelling, physics schemes, parameterizations, WRF. ACKNOWLEDGEMENTS This work has been financed by the projects P11-RNM-7941 (Junta de Andalucía-Spain) and CGL2013-48539-R (MINECO-Spain, FEDER).

  5. Sensitivity of Statistical Downscaling Techniques to Reanalysis Choice and Implications for Regional Climate Change Scenarios

    NASA Astrophysics Data System (ADS)

    Manzanas, R., Sr.; Brands, S.; San Martin, D., Sr.; Gutiérrez, J. M., Sr.

    2014-12-01

    This work shows that local-scale climate projections obtained by means of statistical downscaling are sensitive to the choice of reanalysis used for calibration. To this aim, a Generalized Linear Model (GLM) approach is applied to downscale daily precipitation in the Philippines. First, the GLMs are trained and tested -under a cross-validation scheme- separately for two distinct reanalyses (ERA-Interim and JRA-25) for the period 1981-2000. When the observed and downscaled time-series are compared, the attained performance is found to be sensitive to the reanalysis considered if climate change signal bearing variables (temperature and/or specific humidity) are included in the predictor field. Moreover, performance differences are shown to be in correspondence with the disagreement found between the raw predictors from the two reanalyses. Second, the regression coefficients calibrated either with ERA-Interim or JRA-25 are subsequently applied to the output of a Global Climate Model (MPI-ECHAM5) in order to assess the sensitivity of local-scale climate change projections (up to 2100) to reanalysis choice. In this case, the differences detected in present climate conditions are considerably amplified, leading to "delta-change" estimates differing by up to a 35% (on average for the entire country) depending on the reanalysis used for calibration. Therefore, reanalysis choice is shown to importantly contribute to the uncertainty of local-scale climate change projections, and, consequently, should be treated with equal care as other, well-known, sources of uncertainty -e.g., the choice of the GCM and/or downscaling method.- Implications of the results for the entire tropics, as well as for the Model Output Statistics downscaling approach are also briefly discussed.

  6. Oral Historical, Documentary, and Archaeological Investigations of Barton and Vinton, Mississippi: An Interim Report on Phase 3 of the Tombigbee Historic Townsites Project

    DTIC Science & Technology

    1983-11-01

    studied a riverside plantation and tenant community (Adams 1980), a . black tenant community (Kern et al. 1982b), a light industrial site and mill...the following propositions. The last half of the nineteenth century was one of unprecedented industrial productivity as the mechanical inven- tions of...originally his undertaking as well.125 Despite his apparent industry , Young’s venture at Vinton failed in spring 1852, his New York creditors having

  7. Real-time software failure characterization

    NASA Technical Reports Server (NTRS)

    Dunham, Janet R.; Finelli, George B.

    1990-01-01

    A series of studies aimed at characterizing the fundamentals of the software failure process has been undertaken as part of a NASA project on the modeling of a real-time aerospace vehicle software reliability. An overview of these studies is provided, and the current study, an investigation of the reliability of aerospace vehicle guidance and control software, is examined. The study approach provides for the collection of life-cycle process data, and for the retention and evaluation of interim software life-cycle products.

  8. Understanding Gulf War Illness: An Integrative Modeling Approach

    DTIC Science & Technology

    2015-10-01

    ELEMENT NUMBER 6. AUTHOR(S) Mariana Morris, PhD, Nancy Klimas, MD, Gordon Broderick , PhD, James O’Callaghan, 5d. PROJECT NUMBER PhD and James...12, 2015, Dr. Broderick submitted 1st detailed report in follow up of Fort Detrick EAB meeting (September 2014). (Task 1; Subtask 2)  On March 4, 2015...Dr, Broderick submitted a 2nd interim report to address additional questions asked by Dr. Reifman on March 2, 2015. (Task 1; Subtask 2)  Dr

  9. Materials and Processes for the New Millennium

    NASA Technical Reports Server (NTRS)

    Hayes, Paul W.; Richardson, Rod W.

    2004-01-01

    The single greatest threat to material availability over the last decade has been Compliance to New Environmental Regulations. Federal Regulations: a) Clean Air Acts Amendments - 1990 - Titles I, III and VI; b) NASA Interim Policy- 1995 end date; c) Montreal Protocol - 2000 and 2005 end dates; d) Industrial Toxics Project - HAP emissions by 1995; e) Florida DER - VOC limits by 1995 (CA); f) OSHA Health Related Regulations 1) Carcinogens 2) Mutagens 3). Material availability is complicated by local and state regulations and their own compliance schedules.

  10. Special Inspector General for Iraq Reconstruction. Quarterly Report and Semiannual Report to the United States Congress

    DTIC Science & Technology

    2011-01-30

    Basrah now.”This state- ment by a representative from the gover - nor’s office sums up the current invest- ment climate in Basrah—one of improving...other commercial invest- ment projects, including those in agriculture, tourism , and industry.425 Still, Iraq remains a difficult place to dobusiness...not U.S. appropriations—specifically those identified as “Interim Iraq Goverment Funds” [sic] and “Iraqi Cmdr’s Emrgcy Resp Prog” in the Fund Type

  11. Engineering Tests of Experimental Ammonia Process Printer-Developer

    DTIC Science & Technology

    1950-07-06

    of materials and processes for photo reproduction by the amonia process. c. It was expected that the new machine might also pro- vide an interim...grease, oil, amonia waste can, and attachzmnts. A 6- inch diareter flexible tube is attached at the roar of the rxchine for carrying away the exhaust heat...by field troops. 2 TGIF 58 SUBJECT: Amonia Process Equipment Developed Under Project 8-35-09-005 19 Jan 50 7. An early reply would be required in

  12. Complete Host Testing with a Potential Biological Control Agent on Common Reed in View of Submitting a Petition for Field Release in Winter 2014/15

    DTIC Science & Technology

    2014-12-01

    natural field setting. Leaf sheaths of native reed are looser and tend to fall off before winter. Ovipositing females might notice the difference and...Interim Report August-December 2014 Contract No. W911NF-14-1-0510 Project title: Complete host testing with a potential ...4. TITLE AND SUBTITLE Complete host testing with a potential biological control agent on common reed in view of submitting a petition for field

  13. Making medical records professional(s).

    PubMed

    Mason, A

    1987-07-01

    In 1986 a joint medical records project group was set up by the Institute of Health Services Management, the Association of Health Care Information and Medical Records Officers and the NHS Training Authority, with Mr Vic Peel as chairman. The group was supported by Arthur Andersen & Co, management consultants. The following is a shortened and edited version of an interim report drafted for the group by Dr Alastair Mason. It is intended for discussion and does not yet represent the definitive views of the sponsoring bodies.

  14. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma: interpretation criteria and concordance rate among reviewers.

    PubMed

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F

    2013-05-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.

  15. Publishing interim results of randomised clinical trials in peer-reviewed journals.

    PubMed

    Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan

    2017-02-01

    Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.

  16. Parallelization of Rocket Engine Simulator Software (PRESS)

    NASA Technical Reports Server (NTRS)

    Cezzar, Ruknet

    1997-01-01

    Parallelization of Rocket Engine System Software (PRESS) project is part of a collaborative effort with Southern University at Baton Rouge (SUBR), University of West Florida (UWF), and Jackson State University (JSU). The second-year funding, which supports two graduate students enrolled in our new Master's program in Computer Science at Hampton University and the principal investigator, have been obtained for the period from October 19, 1996 through October 18, 1997. The key part of the interim report was new directions for the second year funding. This came about from discussions during Rocket Engine Numeric Simulator (RENS) project meeting in Pensacola on January 17-18, 1997. At that time, a software agreement between Hampton University and NASA Lewis Research Center had already been concluded. That agreement concerns off-NASA-site experimentation with PUMPDES/TURBDES software. Before this agreement, during the first year of the project, another large-scale FORTRAN-based software, Two-Dimensional Kinetics (TDK), was being used for translation to an object-oriented language and parallelization experiments. However, that package proved to be too complex and lacking sufficient documentation for effective translation effort to the object-oriented C + + source code. The focus, this time with better documented and more manageable PUMPDES/TURBDES package, was still on translation to C + + with design improvements. At the RENS Meeting, however, the new impetus for the RENS projects in general, and PRESS in particular, has shifted in two important ways. One was closer alignment with the work on Numerical Propulsion System Simulator (NPSS) through cooperation and collaboration with LERC ACLU organization. The other was to see whether and how NASA's various rocket design software can be run over local and intra nets without any radical efforts for redesign and translation into object-oriented source code. There were also suggestions that the Fortran based code be encapsulated in C + + code thereby facilitating reuse without undue development effort. The details are covered in the aforementioned section of the interim report filed on April 28, 1997.

  17. The polar WRF downscaled historical and projected 21st century climate for the coast and foothills of Arctic Alaska

    NASA Astrophysics Data System (ADS)

    Cai, Lei; Alexeev, Vladimir A.; Arp, Christopher D.; Jones, Benjamin M.; Liljedahl, Anna K.; Gädeke, Anne

    2018-01-01

    Climate change is most pronounced in the northern high latitude region. Yet, climate observations are unable to fully capture regional-scale dynamics due to the sparse weather station coverage, which limits our ability to make reliable climate-based assessments. A set of simulated data products was therefore developed for the North Slope of Alaska through a dynamical downscaling approach. The polar-optimized Weather Research & Forecast (Polar WRF) model was forced by three sources: The ERA-interim reanalysis data (for 1979-2014), the Community Earth System Model 1.0 (CESM1.0) historical simulation (for 1950-2005), and the CESM1.0 projected (for 2006-2100) simulations in two Representative Concentration Pathways (RCP4.5 and RCP8.5) scenarios. Climatic variables were produced in a 10-km grid spacing and a 3-hour interval. The ERA-interim forced WRF (ERA-WRF) proves the value of dynamical downscaling, which yields more realistic topographical-induced precipitation and air temperature, as well as corrects underestimations in observed precipitation. In summary, dry and cold biases to the north of the Brooks Range are presented in ERA-WRF, while CESM forced WRF (CESM-WRF) holds wet and warm biases in its historical period. A linear scaling method allowed for an adjustment of the biases, while keeping the majority of the variability and extreme values of modeled precipitation and air temperature. CESM-WRF under RCP 4.5 scenario projects smaller increase in precipitation and air temperature than observed in the historical CESM-WRF product, while the CESM-WRF under RCP8.5 scenario shows larger changes. The fine spatial and temporal resolution, long temporal coverage, and multi-scenario projections jointly make the dataset appropriate to address a myriad of physical and biological changes occurring on the North Slope of Alaska.

  18. Different predictive values of interim 18F-FDG PET/CT in germinal center like and non-germinal center like diffuse large B-cell lymphoma.

    PubMed

    Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung

    2017-01-01

    Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.

  19. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  20. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  1. NASA Project Planning and Control Handbook

    NASA Technical Reports Server (NTRS)

    Moreland, Robert; Claunch, Cathy L.

    2016-01-01

    This handbook provides an overview of the fundamental principles and explains the functions and products that go into project planning and control. The 2010 Interim Results of the NASA Program Planning and Control (PPC) Study identified seven categories of activities for PPC, and those provide the basis for the seven functions described in this handbook. This handbook maps out the interfaces and interactions between PPC functions, as well as their external interfaces. This integration of information and products within and between functions is necessary to form the whole picture of how a project is progressing. The handbook descriptions are meant to facilitate consistent, common, and comprehensive approaches for providing valued analysis, assessment, and evaluation focused on the project level at NASA. The handbook also describes activities in terms of function rather than the job title or the specific person or organization responsible for the activity, which could differ by Center or size of a project. This handbook is primarily guidance for project planning and control: however, the same principles apply to programs and generally apply to institutional planning and control.

  2. Idaho Habitat and Natural Production Monitoring Part I, 1993 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rich, Bruce A.; Petrosky, Charles E.

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating proposed and existing habitat improvement projects for rainbow-steelhead trout Oncorhynchus mykiss and chinook salmon O. tshawytscha in the Clearwater River and Salmon River drainages on a large scale for the past 8 years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed using increased carrying capacity and/or survival as the best measures ofmore » benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed status of upriver anadromous stocks has precluded measuring full benefits of any habitat project in Idaho. Partial benefit is credited to the mitigation record in the interim period of run restoration.« less

  3. Projecting adverse event incidence rates using empirical Bayes methodology.

    PubMed

    Ma, Guoguang Julie; Ganju, Jitendra; Huang, Jing

    2016-08-01

    Although there is considerable interest in adverse events observed in clinical trials, projecting adverse event incidence rates in an extended period can be of interest when the trial duration is limited compared to clinical practice. A naïve method for making projections might involve modeling the observed rates into the future for each adverse event. However, such an approach overlooks the information that can be borrowed across all the adverse event data. We propose a method that weights each projection using a shrinkage factor; the adverse event-specific shrinkage is a probability, based on empirical Bayes methodology, estimated from all the adverse event data, reflecting evidence in support of the null or non-null hypotheses. Also proposed is a technique to estimate the proportion of true nulls, called the common area under the density curves, which is a critical step in arriving at the shrinkage factor. The performance of the method is evaluated by projecting from interim data and then comparing the projected results with observed results. The method is illustrated on two data sets. © The Author(s) 2013.

  4. On the Linear Stability of Two-Dimensional Barium Clouds. I. The Inviscid Case.

    DTIC Science & Technology

    1984-04-30

    MECVRDT FKPR--7;PG ON13& TYPE OF REPORT 13R1. TIME 8 CIEDO 1 4 AT OF REOT .Y,. Mo.. Day, 37PAECON Interim FROM 10183 TO17’I April 30, 1984 I37 IS...Note that if we write our perturbation ( 8 ) in terms of arc length ro 0 multiplied by a wavenumber k then cos m6 - cos k r0 and m/ro - k (10) 4 ...38 APR 84 NRL-MR-53i2 UNCLASSIFIED F/G 4 /1 NI I EEEEEEEEE L &, 12 am... ~ a m II) ,uut_ _- 7-_ MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF

  5. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  6. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  7. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  8. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  9. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  10. 76 FR 4369 - Special Law Enforcement Commissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY... of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the...

  11. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  12. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  13. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  14. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  15. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  16. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  17. A systematic review of the reporting of Data Monitoring Committees' roles, interim analysis and early termination in pediatric clinical trials

    PubMed Central

    2009-01-01

    Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383

  18. 78 FR 55339 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Capital Adequacy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.

  19. 42 CFR 417.574 - Interim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...

  20. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  1. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  2. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  3. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  4. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  5. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  6. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...

  7. EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.

  8. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  9. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...

  10. 76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...

  11. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  12. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  13. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  14. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  15. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  16. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  17. An interim prosthesis program for lower limb amputees: comparison of public and private models of service.

    PubMed

    Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn

    2010-06-01

    This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.

  18. Wide-Field InfraRed Survey Telescope WFIRST

    NASA Technical Reports Server (NTRS)

    Green, J.; Schechter, P.; Baltay, C.; Bean, R.; Bennett, D.; Brown, R.; Conselice, C.; Donahue, M.; Fan, X.; Rauscher, B.; hide

    2012-01-01

    In December 2010, NASA created a Science Definition Team (SDT) for WFIRST, the Wide Field Infra-Red Survey Telescope, recommended by the Astro 2010 Decadal Survey as the highest priority for a large space mission. The SDT was chartered to work with the WFIRST Project Office at GSFC and the Program Office at JPL to produce a Design Reference Mission (DRM) for WFIRST. Part of the original charge was to produce an interim design reference mission by mid-2011. That document was delivered to NASA and widely circulated within the astronomical community. In late 2011 the Astrophysics Division augmented its original charge, asking for two design reference missions. The first of these, DRM1, was to be a finalized version of the interim DRM, reducing overall mission costs where possible. The second of these, DRM2, was to identify and eliminate capabilities that overlapped with those of NASA's James Webb Space Telescope (henceforth JWST), ESA's Euclid mission, and the NSF's ground-based Large Synoptic Survey Telescope (henceforth LSST), and again to reduce overall mission cost, while staying faithful to NWNH. This report presents both DRM1 and DRM2.

  19. Wave energy resource of Brazil: An analysis from 35 years of ERA-Interim reanalysis data

    PubMed Central

    Araújo, Alex Maurício

    2017-01-01

    This paper presents a characterization of the wave power resource and an analysis of the wave power output for three (AquaBuoy, Pelamis and Wave Dragon) different wave energy converters (WEC) over the Brazilian offshore. To do so it used a 35 years reanalysis database from the ERA-Interim project. Annual and seasonal statistical analyzes of significant height and energy period were performed, and the directional variability of the incident waves were evaluated. The wave power resource was characterized in terms of the statistical parameters of mean, maximum, 95th percentile and standard deviation, and in terms of the temporal variability coefficients COV, SV e MV. From these analyses, the total annual wave power resource available over the Brazilian offshore was estimated in 89.97 GW, with largest mean wave power of 20.63 kW/m in the southernmost part of the study area. The analysis of the three WEC was based in the annual wave energy output and in the capacity factor. The higher capacity factor was 21.85% for Pelamis device at the southern region of the study area. PMID:28817731

  20. [German national second-opinion network for testicular cancer and penile carcinoma : Two sources for evidence-based information].

    PubMed

    Schrader, M; Zengerling, F; Hakenberg, O W; Protzel, C

    2016-09-01

    The second-opinion network for testicular cancer is an internet-based platform addressing physicians treating testicular cancer patients. They are offered a second-opinion before determining further therapy after orchiectomy and completion of staging. The high rate of discrepancies between the first and second opinion in more than 30 % supports the assumption of a deficit in the implementation of treatment guidelines. In 2015, approximately 22 % of the newly diagnosed cases with testicular cancer in Germany were covered by this system. According to the present interim analysis, the second-opinion platform helps to avoid overtreatment of testicular cancer patients. The high acceptance of the project and the encouraging results of this interim analysis gave rise to considerations to apply the second-opinion model to penile carcinoma. Data from the UK and the Netherlands show that the second-opinion network for penile cancer could help to improve treatment standards and results in Germany. Current data and the intended further development of the system are discussed.

  1. Wave energy resource of Brazil: An analysis from 35 years of ERA-Interim reanalysis data.

    PubMed

    Espindola, Rafael Luz; Araújo, Alex Maurício

    2017-01-01

    This paper presents a characterization of the wave power resource and an analysis of the wave power output for three (AquaBuoy, Pelamis and Wave Dragon) different wave energy converters (WEC) over the Brazilian offshore. To do so it used a 35 years reanalysis database from the ERA-Interim project. Annual and seasonal statistical analyzes of significant height and energy period were performed, and the directional variability of the incident waves were evaluated. The wave power resource was characterized in terms of the statistical parameters of mean, maximum, 95th percentile and standard deviation, and in terms of the temporal variability coefficients COV, SV e MV. From these analyses, the total annual wave power resource available over the Brazilian offshore was estimated in 89.97 GW, with largest mean wave power of 20.63 kW/m in the southernmost part of the study area. The analysis of the three WEC was based in the annual wave energy output and in the capacity factor. The higher capacity factor was 21.85% for Pelamis device at the southern region of the study area.

  2. Investigation of Kelvin wave periods during Hai-Tang typhoon using Empirical Mode Decomposition

    NASA Astrophysics Data System (ADS)

    Kishore, P.; Jayalakshmi, J.; Lin, Pay-Liam; Velicogna, Isabella; Sutterley, Tyler C.; Ciracì, Enrico; Mohajerani, Yara; Kumar, S. Balaji

    2017-11-01

    Equatorial Kelvin waves (KWs) are fundamental components of the tropical climate system. In this study, we investigate Kelvin waves (KWs) during the Hai-Tang typhoon of 2005 using Empirical Mode Decomposition (EMD) of regional precipitation, zonal and meridional winds. For the analysis, we use daily precipitation datasets from the Global Precipitation Climatology Project (GPCP) and wind datasets from the European Centre for Medium-Range Weather Forecasts (ECMWF) Interim Re-analysis (ERA-Interim). As an additional measurement, we use in-situ precipitation datasets from rain-gauges over the Taiwan region. The maximum accumulated precipitation was approximately 2400 mm during the period July 17-21, 2005 over the southwestern region of Taiwan. The spectral analysis using the wind speed at 950 hPa found in the 2nd, 3rd, and 4th intrinsic mode functions (IMFs) reveals prevailing Kelvin wave periods of ∼3 days, ∼4-6 days, and ∼6-10 days, respectively. From our analysis of precipitation datasets, we found the Kelvin waves oscillated with periods between ∼8 and 20 days.

  3. 78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...

  4. 78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...

  5. 24 CFR 115.207 - Consequences of interim certification and certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...

  6. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  7. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  8. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  9. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  10. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  11. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...

  12. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...

  13. Storage for greater-than-Class C low-level radioactive waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beitel, G.A.

    1991-12-31

    EG and G Idaho, Inc., at the Idaho National Engineering Laboratory (INEL) is actively pursuing technical storage alternatives for greater-than-Class C low-level radioactive waste (GTCC LLW) until a suitable licensed disposal facility is operating. A recently completed study projects that between 2200 and 6000 m{sup 3} of GTCC LLW will be generated by the year 2035; the base case estimate is 3250 m{sup 3}. The current plan envisions a disposal facility available as early as the year 2010. A long-term dedicated storage facility could be available in 1997. In the meantime, it is anticipated that a limited number of sealedmore » sources that are no longer useful and have GTCC concentrations of radionuclides will require storage. Arrangements are being made to provide this interim storage at an existing DOE waste management facility. All interim stored waste will subsequently be moved to the dedicated storage facility once it is operating. Negotiations are under way to establish a host site for interim storage, which may be operational, at the earliest, by the second quarter of 1993. Two major activities toward developing a long-term dedicated storage facility are ongoing. (a) An engineering study, which explores costs for alternatives to provide environmentally safe storage and satisfy all regulations, is being prepared. Details of some of the findings of that study will be presented. (b) There is also an effort under way to seek the assistance of one or more private companies in providing dedicated storage. Alternatives and options will be discussed.« less

  14. South Asia river flow projections and their implications for water resources

    NASA Astrophysics Data System (ADS)

    Mathison, C.; Wiltshire, A. J.; Falloon, P.; Challinor, A. J.

    2015-06-01

    South Asia is a region with a large and rising population and a high dependance on industries sensitive to water resource such as agriculture. The climate is hugely variable with the region relying on both the Asian Summer Monsoon (ASM) and glaciers for its supply of fresh water. In recent years, changes in the ASM, fears over the rapid retreat of glaciers and the increasing demand for water resources for domestic and industrial use, have caused concern over the reliability of water resources both in the present day and future for this region. The climate of South Asia means it is one of the most irrigated agricultural regions in the world, therefore pressures on water resource affecting the availability of water for irrigation could adversely affect crop yields and therefore food production. In this paper we present the first 25 km resolution regional climate projections of river flow for the South Asia region. ERA-Interim, together with two global climate models (GCMs), which represent the present day processes, particularly the monsoon, reasonably well are downscaled using a regional climate model (RCM) for the periods; 1990-2006 for ERA-Interim and 1960-2100 for the two GCMs. The RCM river flow is routed using a river-routing model to allow analysis of present day and future river flows through comparison with river gauge observations, where available. In this analysis we compare the river flow rate for 12 gauges selected to represent the largest river basins for this region; Ganges, Indus and Brahmaputra basins and characterize the changing conditions from east to west across the Himalayan arc. Observations of precipitation and runoff in this region have large or unknown uncertainties, are short in length or are outside the simulation period, hindering model development and validation designed to improve understanding of the water cycle for this region. In the absence of robust observations for South Asia, a downscaled ERA-Interim RCM simulation provides a benchmark for comparison against the downscaled GCMs. On the basis that these simulations are among the highest resolution climate simulations available we examine how useful they are for understanding the changes in water resources for the South Asia region. In general the downscaled GCMs capture the seasonality of the river flows, with timing of maximum river flows broadly matching the available observations and the downscaled ERA-Interim simulation. Typically the RCM simulations over-estimate the maximum river flows compared to the observations probably due to a positive rainfall bias and a lack of abstraction in the model although comparison with the downscaled ERA-Interim simulation is more mixed with only a couple of the gauges showing a bias compared with the downscaled GCM runs. The simulations suggest an increasing trend in annual mean river flows for some of the river gauges in this analysis, in some cases almost doubling by the end of the century; this trend is generally masked by the large annual variability of river flows for this region. The future seasonality of river flows does not change with the future maximum river flow rates still occuring during the ASM period, with a magnitude in some cases, greater than the present day natural variability. Increases in river flow during peak flow periods means additional water resource for irrigation, the largest usage of water in this region, but also has implications in terms of inundation risk. Low flow rates also increase which is likely to be important at times of the year when water is historically more scarce. However these projected increases in resource from rivers could be more than countered by changes in demand due to reductions in the quantity and quality of water available from groundwater, increases in domestic use due to a rising population or expansion of other industries such as hydro-electric power generation.

  15. Probabilistic Multi-Hazard Assessment of Dry Cask Structures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bencturk, Bora; Padgett, Jamie; Uddin, Rizwan

    systems the concrete shall not only provide shielding but insures stability of the upright canister, facilitates anchoring, allows ventilation, and provides physical protection against theft, severe weather and natural (seismic) as well as man-made events (blast incidences). Given the need to remain functional for 40 years or even longer in case of interim storage, the concrete outerpack and the internal canister components need to be evaluated with regard to their long-term ability to perform their intended design functions. Just as evidenced by deteriorating concrete bridges, there are reported visible degradation mechanisms of dry storage systems especially when high corrosive environmentsmore » are considered in maritime locations. The degradation of reinforced concrete is caused by multiple physical and chemical mechanisms, which may be summarized under the heading of environmental aging. The underlying hygro-thermal transport processes are accelerated by irradiation effects, hence creep and shrinkage need to include the effect of chloride penetration, alkali aggregate reaction as well as corrosion of the reinforcing steel. In light of the above, the two main objectives of this project are to (1) develop a probabilistic multi-hazard assessment framework, and (2) through experimental and numerical research perform a comprehensive assessment under combined earthquake loads and aging induced deterioration, which will also provide data for the development and validation of the probabilistic framework.« less

  16. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  17. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  18. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  19. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  20. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  1. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  2. 76 FR 37781 - Foreign-Trade Zone 26; Atlanta, GA; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...

  3. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  4. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  5. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  6. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...

  7. 17 CFR 210.10-01 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...

  8. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...

  9. 75 FR 66553 - Truth in Lending

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...

  10. Staff Reactions to Interim Leadership in a Student Affairs Organization

    ERIC Educational Resources Information Center

    Jones, Robin D.

    2011-01-01

    Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…

  11. Faculty and Student Views of the Interim Term

    ERIC Educational Resources Information Center

    Centra, John A.; Sobol, Marion G.

    1974-01-01

    Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)

  12. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  13. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  14. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  15. Into the Sunset: Reflections of an Interim Administrator.

    ERIC Educational Resources Information Center

    Marlowe, John

    2000-01-01

    One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)

  16. PCoD Lite - Using an Interim PCoD Protocol to Assess the Effects of Disturbance Associated with US Navy Exercises on Marine Mammal Populations

    DTIC Science & Technology

    2015-09-30

    1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on

  17. An interim overview of LDEF materials findings

    NASA Technical Reports Server (NTRS)

    Stein, Brad A.

    1992-01-01

    The flight and retrieval of the National Aeronautics and Space Administration's Long Duration Exposure Facility (LDEF) provided an opportunity for the study of the low-Earth orbit (LEO) environment and long-duration space environmental effects (SEE) on materials that is unparalleled in the history of the U.S. Space Program. The remarkable flight attitude stability of LDEF enables specific analyses of various individual and combined effects of LEO environmental parameters on identical materials on the same space vehicle. This paper provides an overview of the interim LDEF materials findings of the Principal Investigators and the Materials Special Investigation Group. In general, the LDEF data is remarkably consistent; LDEF will provide a 'benchmark' for materials design data bases for satellites in low-Earth orbit. Some materials were identified to be encouragingly resistant to LEO SEE for 5.8 years; other 'space qualified' materials displayed significant environmental degradation. Molecular contamination was widespread; LDEF offers an unprecedented opportunity to provide a unified perspective of unmanned LEO spacecraft contamination mechanisms. New material development requirements for long-term LEO missions have been identified and current ground simulation testing methods/data for new, durable materials concepts can be validated with LDEF results. LDEF findings are already being integrated into the design of Space Station Freedom.

  18. Evaluation of hydrological cycle in the major European midlatitude river basins in the frame of the CORDEX project

    NASA Astrophysics Data System (ADS)

    Georgievski, Goran; Keuler, Klaus

    2013-04-01

    Water supply and its potential to increase social, economic and environmental risks are among the most critical challenges for the upcoming decades. Therefore, the assessment of the reliability of regional climate models (RCMs) to represent present-day hydrological balance of river basins is one of the most challenging tasks with high priority for climate modelling in order to estimate range of possible socio-economic impacts of the climate change. However, previous work in the frame of 4th IPCC AR and corresponding regional downscaling experiments (with focus on Europe and Danube river basin) showed that even the meteorological re-analyses provide unreliable data set for evaluations of climate model performance. Furthermore, large discrepancies among the RCMs are caused by internal model deficiencies (for example: systematic errors in dynamics, land-soil parameterizations, large-scale condensation and convection schemes), and in spite of higher resolution RCMs do not always improve much the results from GCMs, but even deteriorate it in some cases. All that has a consequence that capturing impact of climate change on hydrological cycle is not an easy task. Here we present state of the art of RCMs in the frame of the CORDEX project for Europe. First analysis shows again that even the up to date ERA-INTERIM re-analysis is not reliable for evaluation of hydrological cycle in major European midlatitude river basins (Seine, Rhine, Elbe, Oder, Vistula, Danube, Po, Rhone, Garonne and Ebro). Therefore, terrestrial water storage, a quasi observed parameter which is a combination of river discharge (from Global River Discharge Centre data set) and atmospheric moisture fluxes from ERA-INTERIM re-analysis, is used for verification. It shows qualitatively good agreement with COSMO-CLM (CCLM) regional climate simulation (abbreviated CCLM_eval) at 0.11 degrees horizontal resolution forced by ERA-INTERIM re-analysis. Furthermore, intercomparison of terrestrial water storage seasonal cycle averaged in Danube river basin for the ten years (1990-1999) overlapping period between CCLM historical experiment (abbreviated CCLM_hist), its forcing GCM (MPI-ESM-LR, here abbreviated MPI_hist) and CCLM_eval is performed. It reveals that CCLM_hist simulation is in better agreement with quasi observed terrestrial water storage than MPI_hist and CCLM_eval. This result seems promising for the assessment of impact of climate change on hydrological cycle. However, evaluation of the whole ensemble of regional climate downscaling experiments participated in CORDEX-Europe project would provide a more robust estimate.

  19. Comparison and validation of gridded precipitation datasets for Spain

    NASA Astrophysics Data System (ADS)

    Quintana-Seguí, Pere; Turco, Marco; Míguez-Macho, Gonzalo

    2016-04-01

    In this study, two gridded precipitation datasets are compared and validated in Spain: the recently developed SAFRAN dataset and the Spain02 dataset. These are validated using rain gauges and they are also compared to the low resolution ERA-Interim reanalysis. The SAFRAN precipitation dataset has been recently produced, using the SAFRAN meteorological analysis, which is extensively used in France (Durand et al. 1993, 1999; Quintana-Seguí et al. 2008; Vidal et al., 2010) and which has recently been applied to Spain (Quintana-Seguí et al., 2015). SAFRAN uses an optimal interpolation (OI) algorithm and uses all available rain gauges from the Spanish State Meteorological Agency (Agencia Estatal de Meteorología, AEMET). The product has a spatial resolution of 5 km and it spans from September 1979 to August 2014. This dataset has been produced mainly to be used in large scale hydrological applications. Spain02 (Herrera et al. 2012, 2015) is another high quality precipitation dataset for Spain based on a dense network of quality-controlled stations and it has different versions at different resolutions. In this study we used the version with a resolution of 0.11°. The product spans from 1971 to 2010. Spain02 is well tested and widely used, mainly, but not exclusively, for RCM model validation and statistical downscliang. ERA-Interim is a well known global reanalysis with a spatial resolution of ˜79 km. It has been included in the comparison because it is a widely used product for continental and global scale studies and also in smaller scale studies in data poor countries. Thus, its comparison with higher resolution products of a data rich country, such as Spain, allows us to quantify the errors made when using such datasets for national scale studies, in line with some of the objectives of the EU-FP7 eartH2Observe project. The comparison shows that SAFRAN and Spain02 perform similarly, even though their underlying principles are different. Both products are largely better than ERA-Interim, which has a much coarser representation of the relief, which is crucial for precipitation. These results are a contribution to the Spanish Case Study of the eartH2Observe project, which is focused on the simulation of drought processes in Spain using Land-Surface Models (LSM). This study will also be helpful in the Spanish MARCO project, which aims at improving the ability of RCMs to simulate hydrometeorological extremes.

  20. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  1. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  2. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  3. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  4. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  5. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  6. 75 FR 54526 - Defense Federal Acquisition Regulation Supplement; Payment of Costs Prior to Definitization...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...

  7. 76 FR 43260 - Foreign-Trade Zone 72-Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...

  8. 75 FR 60436 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  9. 75 FR 24667 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  10. 75 FR 10476 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  11. 76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  12. 75 FR 15420 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an interim...

  13. 76 FR 59119 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim...

  14. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…

  15. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 26 2011-07-01 2011-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  16. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 25 2010-07-01 2010-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  17. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section, when— (1) The company's valid Document of Compliance certificate or Interim Document of Compliance certificate applies to that vessel type; (2) The company's safety management system for the vessel... to the responsible person or their company. (b) An Interim Safety Management Certificate is valid for...

  18. 76 FR 15028 - Airport Improvement Program (AIP): Interim Policy Regarding Access to Airports From Residential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...

  19. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  20. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

Top