ETR BUILDING, TRA642, INTERIOR. CONSOLE FLOOR, NORTH HALF. CAMERA IS ...
ETR BUILDING, TRA-642, INTERIOR. CONSOLE FLOOR, NORTH HALF. CAMERA IS NEAR NORTHWEST CORNER AND FACING SOUTH ALONG WEST CORRIDOR. STORAGE CANAL IS ALONG LEFT OF VIEW; PERIMETER WALL, ALONG RIGHT. CORRIDOR WAS ONE MEANS OF WALKING FROM NORTH TO SOUTH SIDE OF CONSOLE FLOOR. INL NEGATIVE NO. HD46-18-1. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
ETR BUILDING, TRA642, INTERIOR. CONSOLE FLOOR, SOUTH HALF. CABLE TUNNEL. ...
ETR BUILDING, TRA-642, INTERIOR. CONSOLE FLOOR, SOUTH HALF. CABLE TUNNEL. CAMERA FACING SOUTH INTO ETR ELECTRICAL BUILDING (TRA-648). INL NEGATIVE NO. HD46-20-2. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
ETR BUILDING, TRA642, INTERIOR. CONSOLE FLOOR, SOUTH HALF. SOUTH SIDE ...
ETR BUILDING, TRA-642, INTERIOR. CONSOLE FLOOR, SOUTH HALF. SOUTH SIDE OF ETR REACTOR, CAMERA FACING NORTH. CABINET CONTAINING "NUCLEAR INSTRUMENT SYSTEMS" IS RESTRICTED. INL NEGATIVE NO. HD46-18-4. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
ETR CONTROL BUILDING, TRA647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT ...
ETR CONTROL BUILDING, TRA-647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT PANELS AT REAR OF OPERATOR'S CONSOLE GAVE OPERATOR STATUS OF REACTOR PERFORMANCE, COOLANT-WATER CHARACTERISTICS AND OTHER INDICATORS. WINDOWS AT RIGHT LOOKED INTO ETR BUILDING FIRST FLOOR. CAMERA FACING EAST. INL NEGATIVE NO. HD42-6. Mike Crane, Photographer, 3/2004 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
ETR, TRA642. FLOOR PLAN UNDER BALCONY ON CONSOLE FLOOR. MOTORGENERATOR ...
ETR, TRA-642. FLOOR PLAN UNDER BALCONY ON CONSOLE FLOOR. MOTOR-GENERATOR SETS AND OTHER ELECTRICAL EQUIPMENT. PHILLIPS PETROLEUM COMPANY ETR-D-1781, 7/1960. INL INDEX NO. 532-0642-00-706-020384, REV. 1. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
ETR, TRA642. CONSOLE FLOOR. CAMERA IS ON WEST SIDE OF ...
ETR, TRA-642. CONSOLE FLOOR. CAMERA IS ON WEST SIDE OF FLOOR AND FACES NORTH. OUTER WALL OF STORAGE CANAL IS AT RIGHT. SHIELDING IS THICKER AT LOWER LEVEL, WHERE SPENT FUEL ELEMENTS WILL COOL AFTER REMOVAL FROM REACTOR. INL NEGATIVE NO. 56-1401. Jack L. Anderson, Photographer, 5/1/1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. ...
2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA
12. ENGINE TEST CELL BUILDING INTERIOR. DETAIL OF CONTROL CONSOLE ...
12. ENGINE TEST CELL BUILDING INTERIOR. DETAIL OF CONTROL CONSOLE FOR ENGINE TEST CELL 4. LOOKING NORTH. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
NASA Technical Reports Server (NTRS)
Paga Marrero, Hector Jose
2013-01-01
The Master Console oversees the function of Computer Systems in Firing room 1 (FR1). Master Console Operators, MCOs' for short, are our customer. I was integrated into the System Monitoring and Control (SMC) software team that is under the guidance of David Slaiman, who is the product group lead. I have been brought up to speed with System Monitoring and Control. The initial time spent reading SMC software design description and understanding how it works. The current Firing Room 1 Console Display is a floor layout giving the MCO two essential pieces of information which are Health and Status. When an issue arises, the MCO has to look on the display to find which console is affected and then the MCO must use the Reference designator from the display to manually search for the Portal Workstation (PWS) installed in the console using the hardware map; which is a long process to lookup a PWS if an issue is present. My project is to make the FR1 Console Display easier for the MCO's to pinpoint PWS's without having to lookup additional resources in the process. My project also includes updating Firing Room 1 Console Display to include the F1R Non-Redundant Set. The display does not have good use of space and functionality. PWS numbers were not present in the previous design and are the critical component in efficient understanding and administration of the consoles. Part of the process includes getting feedback from the customer, instead of just emailing them with a question, we made a proposal with changes so they could respond and give us their input; which proved to be an effective method for engaging them. In order to do this I had to use the Display Editor (DE) tool developed by NASA, Paint.Net and Visio. The process I have been using has been Visio to alter the floor layout of Firing Room and take advantage of the white areas, and then I take the altered floor plan into Paint.Net. Once in Paint.Net I put the new floor plan as a background to the standard console display. Paint.Net also serves as a tool to create the new service state bars for the new background; finally I used the DE to assemble everything and setup the right CUI's for each PWS.
5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking ...
5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking northeast to firing control room passageway. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA
2014-04-03
CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
2014-04-03
CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
2014-04-03
CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
2014-04-03
CAPE CANAVERAL, Fla. – The Mobile Launcher is visible through a window inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
PBF Control Building (PER619). Interior of control room. Control console ...
PBF Control Building (PER-619). Interior of control room. Control console in center of room. Indicator panels along walls. Window shown in ID-33-F-120 is between control panels at left. Camera facing northwest. Date: May 2004. INEEL negative no. HD-41-7-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
2014-04-03
CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. In view along the soffit are space shuttle launch plaques for 21 missions launched from Firing Room 4. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
69. Commander's launch control console, east end, plexiglass shield up ...
69. Commander's launch control console, east end, plexiglass shield up - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD
3. Credit BG. The interior of the control room appears ...
3. Credit BG. The interior of the control room appears in this view, looking north (0°). The control console in the room center permitted remote control of various propellant grinders and mixers in surrounding buildings. Television monitors (absent from their mounts in this view) permitted direct viewing of operating machinery. From foreground to background: Panel (1) contains OGAR warning light switches for Curing Buildings E-39, E-40, E-41 and E-86; (O=off, G=green safe, A=amber caution, R=red danger) Panel (2) E-85 Oxidizer Dryer Building console: OGAR switch Panel (3) E-84 Oxidizer Grinder Building console: controls for vibrator, feed, and hammer; Panel (4) E-36 Oxidizer Grinder Building console: controls for vibrator, feed, hammer, attritor, and SWECO ("SWECO" undefined) Panels (5) & (6) blank Panel (7) E-38 Mixer & Casting Building console: vacuum pump, blender, heating and cooling controls Panel (8) E-37 Mixer & Casting Building console: motor controls for 1 pint, 1 gallon, 5 gallon and 30 gallon mixers; vacuum pump, deluge (fire suppression), pot up/down, vibrator, feed, and SWECO. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA
70. Commander's launch control console, plexiglass shield down, looking southeast, ...
70. Commander's launch control console, plexiglass shield down, looking southeast, filing cabinet in corner - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD
77. Deputy commander's launch control console, fire control panel missing ...
77. Deputy commander's launch control console, fire control panel missing at right, south side - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD
MTR, TRA603. CONTROL ROOM DETAILS. ACOUSTIC PLASTER CEILING, USHAPED CONSOLE, ...
MTR, TRA-603. CONTROL ROOM DETAILS. ACOUSTIC PLASTER CEILING, U-SHAPED CONSOLE, INSTRUMENT PANELS, GLASS DOOR, ASPHALT TILE FLOOR AND COLORS. BLAW-KNOX 3150-803-11, 10/1950. INL INDEX NO. 531-0603-00-098-100570, REV. 3. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
IET control building (TAN620). control room. facing north. control consoles ...
IET control building (TAN-620). control room. facing north. control consoles have been removed. Openings in floor were communication and control conduits. Periscope controls at center left (see also HAER No. ID-33-E-20). INEEL negative no. HD-21-3-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
46. INTERIOR VIEW TO SOUTH ON SECOND FLOOR: Interior view ...
46. INTERIOR VIEW TO SOUTH ON SECOND FLOOR: Interior view looking south along the east wall on the second floor of the powerhouse and car barn. Note the cable car truck in the foreground. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA
45. INTERIOR VIEW TO SOUTHWEST ON SECOND FLOOR: Interior view ...
45. INTERIOR VIEW TO SOUTHWEST ON SECOND FLOOR: Interior view towards southwest on second floor of main portion of the powerhouse and car barn. This space is used for repair and storage of cable cars. Note wooden trussed roof. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA
44. SECOND FLOOR 'ANNEX' INTERIOR VIEW TO SOUTHWEST: Interior ...
44. SECOND FLOOR 'ANNEX' - INTERIOR VIEW TO SOUTHWEST: Interior view towards southwest on second floor of the powerhouse 'annex.' Note the steel column and beam construction and the old shunt car formerly used to move cable cars around the yard. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA
Interior, equipment room, weather support area (from July, 1968 drawing) ...
Interior, equipment room, weather support area (from July, 1968 drawing) at north end of display area, looking west. Window looks south towards the main console - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
PBF Control Building (PER619). Interior of control room shows control ...
PBF Control Building (PER-619). Interior of control room shows control console from direction facing visitors room and its observation window. Camera facing northeast. Date: May 2004. INEEL negative no. HD-41-7-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
127. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM ...
127. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM 6156, OFFICE OF THE SECRETARY OF THE INTERIOR, WEST WALL - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
125. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ENTRANCE ...
125. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ENTRANCE TO THE OFFICE OF THE SECRETARY OF THE INTERIOR - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
130. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM ...
130. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM 6156, OFFICE OF THE SECRETARY OF THE INTERIOR, BRONZE WALL CLOCK - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
4. First floor interior. Camera facing west. Mirrored interior supports ...
4. First floor interior. Camera facing west. Mirrored interior supports mark the former division between 11 and 13 North Broad Street. - 11-15 North Broad Street (Commercial Building), 11-15 North Broad Street, Trenton, Mercer County, NJ
85. INTERIOR VIEW, DETAIL, HEAD HOUSE, FIRST FLOOR AMBULATORY, WOOD ...
85. INTERIOR VIEW, DETAIL, HEAD HOUSE, FIRST FLOOR AMBULATORY, WOOD FLOOR SHOWING ORIGINAL AND REPLACED PANELS, LOOKING SOUTHWEST - Timberline Lodge, Timberline Trail, Government Camp, Clackamas County, OR
50. INTERIOR VIEW TO SOUTH AT FIRST FLOOR MACHINE SHOP: ...
50. INTERIOR VIEW TO SOUTH AT FIRST FLOOR MACHINE SHOP: Interior view towards south of the machine shop located on the first floor of the powerhouse and car barn. Compare this view with CA-12-74, taken seventeen years earlier. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA
13. Bottom floor, tower interior showing concrete floor and cast ...
13. Bottom floor, tower interior showing concrete floor and cast iron bases for oil butts (oil butts removed when lighthouse lamp was converted to electric power.) - Block Island Southeast Light, Spring Street & Mohegan Trail at Mohegan Bluffs, New Shoreham, Washington County, RI
LOFT. Interior, control room in control building (TAN630). Camera facing ...
LOFT. Interior, control room in control building (TAN-630). Camera facing north. Sign says "This control console is partially active. Do not operate any switch handle without authorization." Date: May 2004. INEEL negative no. HD-39-14-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Credit PSR. Interior view shows the building equipment room as ...
Credit PSR. Interior view shows the building equipment room as seen looking south southwest (206°) from the doorway. The control console contains switches for chiller pumps, fans, heaters, temperature controls, and alarms - Jet Propulsion Laboratory Edwards Facility, Solid Propellant Conditioning Building, Edwards Air Force Base, Boron, Kern County, CA
LPT. Low power test control building (TAN641) interior. Camera facing ...
LPT. Low power test control building (TAN-641) interior. Camera facing northeast at what remains of control room console. Cut in wall at right of view shows west wall of northern test cell. INEEL negative no. HD-40-4-4 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
3. MILK BARN, INTERIOR VIEW OF GROUND FLOOR, LOOKING 132 ...
3. MILK BARN, INTERIOR VIEW OF GROUND FLOOR, LOOKING 132 DEGREES SOUTHEAST, SHOWING RAISED FLOOR OF CENTRAL AISLE. - Hudson-Cippa-Wolf Ranch, Milk Barn, Sorento Road, Sacramento, Sacramento County, CA
13. INTERIOR VIEW, FIRST FLOOR SHOWING THE ELEVATORS FEEDING GRAIN ...
13. INTERIOR VIEW, FIRST FLOOR SHOWING THE ELEVATORS FEEDING GRAIN FROM THE SECOND FLOOR TO THE GRINDING STONES, WITH GRAIN ELEVATORS IN BACKGROUND (NOTE OUTLINE ON THE FLOOR WHERE ROLLER MILLS WERE ORIGINALLY PLACED) - Schech's Mill, Beaver Creek State Park, La Crescent, Houston County, MN
106. INTERIOR, FIFTH FLOOR, WING 5100 WEST, ROOM 5160, SECRETARY'S ...
106. INTERIOR, FIFTH FLOOR, WING 5100 WEST, ROOM 5160, SECRETARY'S CONFERENCE ROOM (AFTER REMODELING) - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
129. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM ...
129. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM 6156, OFFICE OF THE SECRETARY OF THE INTERIOR, DOUBLE DOOR (4' x 5' negative; 8' x 10' print) - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
126. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM ...
126. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM 6156, OFFICE OF THE SECRETARY OF THE INTERIOR, LOOKING NORTHEAST (4' x 5' negative; 8' x 10' print) - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
128. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM ...
128. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM 6156, OFFICE OF THE SECRETARY OF THE INTERIOR, FIREPLACE (4' x 5' negative; 8' x 10' print) - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
Interior, first floor southeast side of building, showing french doors ...
Interior, first floor southeast side of building, showing french doors and interior windows - Fitzsimons General Hospital, Open Air Tuberculosis Ward, West Pennington Avenue & North Hickey Street Southwest Corner, Aurora, Adams County, CO
50. INTERIOR, FIRST FLOOR, MAIN CORRIDOR, ROOM 1023, INDIAN ARTS ...
50. INTERIOR, FIRST FLOOR, MAIN CORRIDOR, ROOM 1023, INDIAN ARTS AND CRAFTS SHOP, DETAIL OF TIN LIGHTING SCONCE - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
133. INTERIOR, SIXTH FLOOR, WING 6300 WEST, TYPICAL SIDE CORRIDOR ...
133. INTERIOR, SIXTH FLOOR, WING 6300 WEST, TYPICAL SIDE CORRIDOR (4' x 5' negative; 8' x 10' print) - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
108. INTERIOR, FIFTH FLOOR, WING 5100 WEST, ROOM 5160, SECRETARY'S ...
108. INTERIOR, FIFTH FLOOR, WING 5100 WEST, ROOM 5160, SECRETARY'S CONFERENCE ROOM (AFTER REMODELING), DETAIL OF CEILING DECORATION - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
107. INTERIOR, FIFTH FLOOR, WING 5100 WEST, ROOM 5160, SECRETARY'S ...
107. INTERIOR, FIFTH FLOOR, WING 5100 WEST, ROOM 5160, SECRETARY'S CONFERENCE ROOM (AFTER REMODELING), DETAIL OF PANELING - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 ...
17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; NOTEBOOKS IN FOREGROUND ARE ON TOP OF THE NEW SWITCH GEAR CONTROL CONSOLE; THE ORIGINAL OPERATOR DESK IS IN CENTER; THE ORIGINAL BENCH BOARD CONTROLS ARE IN BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR
132. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM ...
132. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM 6156, OFFICE OF THE SECRETARY OF THE INTERIOR, PLASTER CEILING MEDALLION AND BRONZE CHANDELIER (4' x 5' negative; 8' x 10' print) - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
131. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM ...
131. INTERIOR, SIXTH FLOOR, WING 6100 WEST, SUITE 6000, ROOM 6156, OFFICE OF THE SECRETARY OF THE INTERIOR, DETAIL OF FRIEZE, SOFFIT, AND CEILING DECORATION (4' x 5' negative; 8' x 10' print) - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
Interior, first floor, central lobby, detail of dedication plaque of ...
Interior, first floor, central lobby, detail of dedication plaque of terrazzo floor, looking west - U.S. Veterans Hospital, Jefferson Barracks, Admissions Building, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
NASA Technical Reports Server (NTRS)
Regian, J. Wesley; Shebilske, Wayne; Monk, John M.
1993-01-01
We explored the training potential of Virtual Reality (VR) technology. Thirty-one adults were trained and tested on spatial skills in a VR. They learned a sequence of button and knob responses on a VR console and performed flawlessly on the same console. Half were trained with a rote strategy; the rest used a meaningful strategy. Response times were equivalent for both groups and decreased significantly over five test trials indicating that learning continued on VR tests. The same subjects practiced navigating through a VR building, which had three floors with four rooms on each floor. The dependent measure was the number of rooms traversed on routes that differed from training routes. Many subjects completed tests in the fewest rooms possible. All subjects learned configurational knowledge according to the criterion of taking paths that were significantly shorter than those predicted by a random walk as determined by a Monte Carlo analysis. The results were discussed as a departure point for empirically testing the training potential of VR technology.
141. INTERIOR, SEVENTH FLOOR, WING 7100 WEST, ROOM 7138, DOUBLE ...
141. INTERIOR, SEVENTH FLOOR, WING 7100 WEST, ROOM 7138, DOUBLE DOOR TO THE LAW BRANCH OF THE NATIONAL LIBRARY OF NATURAL RESOURCES - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
Creating Library Interiors: Planning and Design Considerations.
ERIC Educational Resources Information Center
Jones, Plummer Alston, Jr.; Barton, Phillip K.
1997-01-01
Examines design considerations for public library interiors: access; acoustical treatment; assignable and nonassignable space; building interiors: ceilings, clocks, color, control, drinking fountains; exhibit space: slotwall display, floor coverings, floor loading, furniture, lighting, mechanical systems, public address, copying machines,…
15. Interior view, greenhouse, from the northwest. The greenhouse interior ...
15. Interior view, greenhouse, from the northwest. The greenhouse interior was quite modest, the space between the floor of the lower level and the joists carrying the loft floor is only five-and-one-half feet. - John Bartram House & Garden, Greenhouse, 54th Street & LIndbergh Boulevard, Philadelphia, Philadelphia County, PA
42. Interior view of the second floor, looking from the ...
42. Interior view of the second floor, looking from the southeast toward the north end of the building (note door that matches the present front door on floor) - Kiskiack, Naval Mine Depot, State Route 238 vicinity, Yorktown, York County, VA
3. Building J interior, ground floor, looking northwest toward Building ...
3. Building J interior, ground floor, looking northwest toward Building L and showing clerestory. Portion to left of clerestory has an upper floor. - Daniel F. Waters Germantown Dye Works, Building J, 37-55 East Wister Street, Philadelphia, Philadelphia County, PA
INTERIOR VIEW OF BATHROOM 1, SECOND FLOOR. NOTE THE ORIGINAL ...
INTERIOR VIEW OF BATHROOM 1, SECOND FLOOR. NOTE THE ORIGINAL MOSAIC PATTERN FLOOR TILE, TILE WAINSCOT, CERAMIC ACCESSORIES, AND SINGLE-PANEL DOOR TO LINEN CLOSET. VIEW FACING NORTHEAST. - Hickam Field, Officers' Housing Type K, 304 Sixth Street, Honolulu, Honolulu County, HI
INTERIOR VIEW OF SECOND FLOOR STAIR HALL. SHOWING THE IRON ...
INTERIOR VIEW OF SECOND FLOOR STAIR HALL. SHOWING THE IRON STAIR RAILS AND NEWEL POSTS WITH INCISED LINES. NOTE THE TONGUE-AND-GROOVE WOOD FLOORING. VIEW FACING EAST. - Hickam Field, Officers' Housing Type L, 702 Julian Avenue, Honolulu, Honolulu County, HI
26. GRAINELEVATOR SECTION, SECOND FLOOR, INTERIOR, DETAIL OF GRAIN CRIB ...
26. GRAIN-ELEVATOR SECTION, SECOND FLOOR, INTERIOR, DETAIL OF GRAIN CRIB FRAMING; ELECTRICAL EQUIPMENT IS MOUNTED ON WHAT WAS ONCE THE INTERIOR OF BIN NUMBER NINE; LOOKING SOUTHEAST - Standard Mill, 116-118 Portland Avenue South, Minneapolis, Hennepin County, MN
Interior of display area (room 101), looking south towards TV ...
Interior of display area (room 101), looking south towards TV control panel room (room 139) at far left corner. The stairway leads to the commander's quarters and the senior battle viewing bridge at top right. Control and communication consoles at the right - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
42. INTERIOR, FIRST FLOOR, NORTHWEST CORNER OF GRAND STAIRCASE (STAIRS ...
42. INTERIOR, FIRST FLOOR, NORTHWEST CORNER OF GRAND STAIRCASE (STAIRS G), SIDE AISLE, WEST WALL, THE NEGRO'S CONTRIBUTION IN THE SOCIAL AND CULTURAL DEVELOPMENT OF AMERICA: SCIENCE MURAL - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
45. INTERIOR, FIRST FLOOR, SOUTHEAST CORNER OF GRAND STAIRCASE (STAIRS ...
45. INTERIOR, FIRST FLOOR, SOUTHEAST CORNER OF GRAND STAIRCASE (STAIRS G), SIDE AISLE, EAST WALL, THE NEGRO'S CONTRIBUTION IN THE SOCIAL AND CULTURAL DEVELOPMENT OF AMERICA: EDUCATION MURAL - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
18. RW Meyer Sugar Mill: 18761889. Boiling House Interior, 1878. ...
18. RW Meyer Sugar Mill: 1876-1889. Boiling House Interior, 1878. View: Detail of floor with molasses pits below floor level. The remaining floor boards indicate the structure of the floor covering the entire inside of the boiling house. In the left background the base of the centrifugals are in view. - R. W. Meyer Sugar Mill, State Route 47, Kualapuu, Maui County, HI
12. INTERIOR OF COVERED WALKWAY BEHIND SECOND FLOOR APARTMENTS FROM ...
12. INTERIOR OF COVERED WALKWAY BEHIND SECOND FLOOR APARTMENTS FROM OPPOSITE VIEW OF CA-XXX-11. DOOR AT PHOTO LEFT OPENS INTO THE KITCHEN OF THE WEST SIDE SECOND FLOOR APARTMENT. VIEW TO EAST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
24. Interior view of third floor attic of 1896 south ...
24. Interior view of third floor attic of 1896 south section of building. Note steel truss supports and wooden roof. Top floor round window in seen from outside in photo WA-116-A-2. - Puget Sound Naval Shipyard, Pattern Shop, Farragut Avenue, Bremerton, Kitsap County, WA
43. INTERIOR, FIRST FLOOR, SOUTHWEST CORNER OF GRAND STAIRCASE (STAIRS ...
43. INTERIOR, FIRST FLOOR, SOUTHWEST CORNER OF GRAND STAIRCASE (STAIRS G), SIDE AISLE, WEST WALL, THE NEGRO'S CONTRIBUTION IN THE SOCIAL AND CULTURAL DEVELOPMENT OF AMERICA: THE ARTS MURAL - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
INTERIOR OF SECOND FLOOR AIRFIELD MANAGEMENT SUPERINTENDENT'S OFFICE. VIEW TO ...
INTERIOR OF SECOND FLOOR AIRFIELD MANAGEMENT SUPERINTENDENT'S OFFICE. VIEW TO SOUTHEAST - Plattsburgh Air Force Base, Base Operations Building, Idaho at Alabama Avenue, Plattsburgh, Clinton County, NY
105. INTERIOR VIEW, DETAIL, HEAD HOUSE, SECOND FLOOR BALCONY, CHANDELIER ...
105. INTERIOR VIEW, DETAIL, HEAD HOUSE, SECOND FLOOR BALCONY, CHANDELIER AND INDIAN INSCRIPTION ON CHIMNEY, LOOKING NORTHWEST - Timberline Lodge, Timberline Trail, Government Camp, Clackamas County, OR
INTERIOR SECOND FLOOR EAST ENGINEERING DESIGN AREA DETAIL VIEW, FACING ...
INTERIOR SECOND FLOOR EAST ENGINEERING DESIGN AREA DETAIL VIEW, FACING NORTH. - NASA Industrial Plant, Systems Integration & Checkout Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA
Assembly room, bunkhouse first floor interior. Vent pipe for missing ...
Assembly room, bunkhouse first floor interior. Vent pipe for missing heating stove exited through opening into chimney, seen on the far wall. Walls are exposed studs and bracing with board and battan on the exterior and interior sides. - Sespe Ranch, Bunkhouse, 2896 Telegraph Road, Fillmore, Ventura County, CA
General interior view of first floor showroom, showing piers. Photograph ...
General interior view of first floor showroom, showing piers. Photograph taken April 1973. - Scarritt Building & Arcade, Ninth Street & Grand Avenue, & 819 Walnut Street, Kansas City, Jackson County, MO
63. INTERIOR VIEW, DETAIL, HEAD HOUSE, GROUND FLOOR, BARLOW ROOM, ...
63. INTERIOR VIEW, DETAIL, HEAD HOUSE, GROUND FLOOR, BARLOW ROOM, CARVED LINOLEUM WALL PANEL FLANKING THE ENTRANCE, LOOKING WEST - Timberline Lodge, Timberline Trail, Government Camp, Clackamas County, OR
64. INTERIOR VIEW, DETAIL, HEAD HOUSE, GROUND FLOOR, BARLOW ROOM, ...
64. INTERIOR VIEW, DETAIL, HEAD HOUSE, GROUND FLOOR, BARLOW ROOM, CARVED LINOLEUM WALL PANEL FLANKING THE ENTRANCE, LOOKING WEST - Timberline Lodge, Timberline Trail, Government Camp, Clackamas County, OR
Interior view of second floor sleeping area; camera facing south. ...
Interior view of second floor sleeping area; camera facing south. - Mare Island Naval Shipyard, Marine Barracks, Cedar Avenue, west side between Twelfth & Fourteenth Streets, Vallejo, Solano County, CA
Interior, second floor south side of building toward east end ...
Interior, second floor south side of building toward east end - Fitzsimons General Hospital, Open Air Tuberculosis Ward, West Pennington Avenue & North Hickey Street Southwest Corner, Aurora, Adams County, CO
Interior, second floor north side of building toward east end ...
Interior, second floor north side of building toward east end - Fitzsimons General Hospital, Open Air Tuberculosis Ward, West Pennington Avenue & North Hickey Street Southwest Corner, Aurora, Adams County, CO
11. Interior view, second floor, tin shop area looking southwest, ...
11. Interior view, second floor, tin shop area looking southwest, showing laminated plank arched roof trusses. - Larrabee & Hingston Company, Main Shop Building, 19 Howley Street, Peabody, Essex County, MA
6. Interior view of tanks on first floor, looking east. ...
6. Interior view of tanks on first floor, looking east. - Delaware, Lackawanna & Western Railroad, Scranton Yards, Oil House, 650 feet Southeast of Cliff & Mechanic Streets, Scranton, Lackawanna County, PA
7. Row of pumps against first floor interior west wall. ...
7. Row of pumps against first floor interior west wall. - Delaware, Lackawanna & Western Railroad, Scranton Yards, Oil House, 650 feet Southeast of Cliff & Mechanic Streets, Scranton, Lackawanna County, PA
Interior view of second floor lobby; camera facing south. ...
Interior view of second floor lobby; camera facing south. - Mare Island Naval Shipyard, Hospital Headquarters, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo, Solano County, CA
Interior detail of first floor lobby; camera facing northeast. ...
Interior detail of first floor lobby; camera facing northeast. - Mare Island Naval Shipyard, Hospital Ward, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo, Solano County, CA
Interior view of second floor space; camera facing southwest. ...
Interior view of second floor space; camera facing southwest. - Mare Island Naval Shipyard, Hospital Ward, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo, Solano County, CA
22. INTERIOR, FIRST FLOOR, EAST SECTION, NORTHEAST ROOM, NORTHWEST CORNER ...
22. INTERIOR, FIRST FLOOR, EAST SECTION, NORTHEAST ROOM, NORTHWEST CORNER (NOTE EXPOSED BRICK NOGGING) - Peter Burr House, Vicinity of State Route 9 & Ridge Road, Shenandoah Junction, Jefferson County, WV
13. DETAIL, SOUTH (FRONT), HEAD HOUSE FIRST FLOOR ENTRANCE, INTERIOR ...
13. DETAIL, SOUTH (FRONT), HEAD HOUSE FIRST FLOOR ENTRANCE, INTERIOR SIDE OF DOOR WITH CARVED INDIAN HEAD (ORIGINALLY ON EXTERIOR) - Timberline Lodge, Timberline Trail, Government Camp, Clackamas County, OR
INTERIOR OF SECOND FLOOR, OUTSIDE PROJECTION ROOM ABOVE ENTRY PORCH, ...
INTERIOR OF SECOND FLOOR, OUTSIDE PROJECTION ROOM ABOVE ENTRY PORCH, VIEW FACING WEST. - Naval Air Station Barbers Point, Theater, Yorktown Avenue between Wasp & Saipan Streets, Ewa, Honolulu County, HI
Brightening and Volatile Distribution Within Shackleton Crater Observed by the LRO Laser Altimeter.
NASA Technical Reports Server (NTRS)
Smith, D. E.; Zuber, M. T.; Head, J. W.; Neumann, G. A.; Mazarico, E.; Torrence, M. H.; Aharonson, O.; Tye, A. R.; Fassett, C. I.; Rosengurg, M. A.;
2012-01-01
Shackleton crater, whose interior lies largely in permanent shadow, is of interest due to its potential to sequester volatiles. Observations from the Lunar Orbiter Laser Altimeter onboard the Lunar Reconnaissance Orbiter have enabled an unprecedented topographic characterization, revealing Shackleton to be an ancient, unusually well-preserved simple crater whose interior walls are fresher than its floor and rim. Shackleton floor deposits are nearly the same age as the rim, suggesting little floor deposition since crater formation over 3 billion years ago. At 1064 nm the floor of Shackleton is brighter than the surrounding terrain and the interiors of nearby craters, but not as bright as the interior walls. The combined observations are explainable primarily by downslope movement of regolith on the walls exposing fresher underlying material. The relatively brighter crater floor is most simply explained by decreased space weathering due to shadowing, but a 1-mm-thick layer containing approx 20% surficial ice is an alternative possibility.
44. INTERIOR, FIRST FLOOR, NORTHEAST CORNER OF GRAND STAIRCASE (STAIRS ...
44. INTERIOR, FIRST FLOOR, NORTHEAST CORNER OF GRAND STAIRCASE (STAIRS G), SIDE AISLE, EAST WALL, THE NEGRO'S CONTRIBUTION IN THE SOCIAL AND CULTURAL DEVELOPMENT OF AMERICA: RELIGION MURAL (4' x 5' negative; 8' x 10' print) - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
Hallway, bunkhouse, second floor interior. Looking east showing the stair ...
Hallway, bunkhouse, second floor interior. Looking east showing the stair railing, light from skylight above, and original 5 panel wood doors. - Sespe Ranch, Bunkhouse, 2896 Telegraph Road, Fillmore, Ventura County, CA
11. INTERIOR VIEW OF BALCONY FROM GROUND FLOOR LEVEL. ...
11. INTERIOR VIEW OF BALCONY FROM GROUND FLOOR LEVEL. - Wright-Patterson Air Force Base, Area B, Building No. 12, Technical Data Building, Third Street, between B & D Streets, Dayton, Montgomery County, OH
18. MAINTENANCE SHOP, FIRST FLOOR, INTERIOR, ENGINE AND AIRPLANE OVERHAUL ...
18. MAINTENANCE SHOP, FIRST FLOOR, INTERIOR, ENGINE AND AIRPLANE OVERHAUL AREAS; LOOKING EAST - Northwest Airways Hangar & Administration Building, 590 Bayfield Street, St. Paul Downtown Airport (Holman), Saint Paul, Ramsey County, MN
17. MAINTENANCE SHOP, FIRST FLOOR, INTERIOR, ENGINE AND AIRPLANE OVERHAUL ...
17. MAINTENANCE SHOP, FIRST FLOOR, INTERIOR, ENGINE AND AIRPLANE OVERHAUL AREAS; LOOKING WEST. - Northwest Airways Hangar & Administration Building, 590 Bayfield Street, St. Paul Downtown Airport (Holman), Saint Paul, Ramsey County, MN
PLANING MILL, FIRST FLOOR INTERIOR, LOOKING EAST. SUPERVISORS OFFICE AND ...
PLANING MILL, FIRST FLOOR INTERIOR, LOOKING EAST. SUPERVISORS OFFICE AND OVERHEAD MONORAIL TRACK ARE VISIBLE. - Southern Pacific, Sacramento Shops, Planing Mill, 111 I Street, Sacramento, Sacramento County, CA
72. INTERIOR VIEW, HEAD HOUSE, GROUND FLOOR, HALLWAY LEADING TO ...
72. INTERIOR VIEW, HEAD HOUSE, GROUND FLOOR, HALLWAY LEADING TO BLUE OX BAR, LOOKING EAST (ORIGINAL EXTERIOR STONE WALL TO RIGHT) - Timberline Lodge, Timberline Trail, Government Camp, Clackamas County, OR
Interior view of hallway on second floor; camera facing south. ...
Interior view of hallway on second floor; camera facing south. - Mare Island Naval Shipyard, WAVES Officers Quarters, Cedar Avenue, west side between Tisdale Avenue & Eighth Street, Vallejo, Solano County, CA
Building G interior, second floor oblique looking southwest, showing storage ...
Building G interior, second floor oblique looking southwest, showing storage area for samples - Daniel F. Waters Germantown Dye Works, Building G, 37-55 East Wister Street, Philadelphia, Philadelphia County, PA
Servant's quarters, west wing, upper floor interior, looking to south. ...
Servant's quarters, west wing, upper floor interior, looking to south. Doorway at center connects with the Majordomo's sleeping space. - Vallejo Adobe, Adobe Road at Casa Grande, Petaluma, Sonoma County, CA
PLANING MILL, FIRST FLOOR INTERIOR, LOOKING WEST. A WHEEL BORING ...
PLANING MILL, FIRST FLOOR INTERIOR, LOOKING WEST. A WHEEL BORING MACHINE AND SUPERVISORS OFFICE ARE VISIBLE. - Southern Pacific, Sacramento Shops, Planing Mill, 111 I Street, Sacramento, Sacramento County, CA
12. Interior view of second floor west administrative/support office block ...
12. Interior view of second floor west administrative/support office block looking north. - Manchester Airport, Large Hangar, East edge of airport between East Apron & Kelly Avenue, Manchester, Hillsborough County, NH
11. Interior view of first floor east administrative/support office block ...
11. Interior view of first floor east administrative/support office block looking north. - Manchester Airport, Large Hangar, East edge of airport between East Apron & Kelly Avenue, Manchester, Hillsborough County, NH
13. Interior view of second floor east administrative/support office block ...
13. Interior view of second floor east administrative/support office block looking north. - Manchester Airport, Large Hangar, East edge of airport between East Apron & Kelly Avenue, Manchester, Hillsborough County, NH
INTERIOR OF SECOND FLOOR BRIDGE BETWEEN PLANING MILL AND CAR ...
INTERIOR OF SECOND FLOOR BRIDGE BETWEEN PLANING MILL AND CAR MACHINE SHOP, LOOKING SOUTH TOWARD PLANING MILL. - Southern Pacific, Sacramento Shops, Planing Mill, 111 I Street, Sacramento, Sacramento County, CA
29. ISLAND PLANT: INTERIOR VIEW LOOKING SOUTHWEST ON GROUND FLOOR ...
29. ISLAND PLANT: INTERIOR VIEW LOOKING SOUTHWEST ON GROUND FLOOR - American Falls Water, Power & Light Company, Island Power Plant, Snake River, below American Falls Dam, American Falls, Power County, ID
PROCESS WATER BUILDING, TRA605, INTERIOR. FIRST FLOOR. CAMERA IS IN ...
PROCESS WATER BUILDING, TRA-605, INTERIOR. FIRST FLOOR. CAMERA IS IN SOUTHEAST CORNER AND FACES NORTHWEST. CONTROL ROOM AT RIGHT. CRANE MONORAIL IS OVER FLOOR HATCHES AND FLOOR OPENINGS. SIX VALVE HANDWHEELS ALONG FAR WALL IN LEFT CENTER VIEW. SEAL TANK IS ON OTHER SIDE OF WALL; PROCESS WATER PIPES ARE BELOW VALVE WHEELS. NOTE CURBS AROUND FLOOR OPENINGS. INL NEGATIVE NO. HD46-26-3. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
INTERIOR VIEW OF THE FIRST FLOOR, SHOWING COLUMNS WITH CONICAL ...
INTERIOR VIEW OF THE FIRST FLOOR, SHOWING COLUMNS WITH CONICAL CAPITALS. VIEW FACING SOUTH. - U.S. Naval Base, Pearl Harbor, Aviation Storehouse, Vincennes Avenue at Simms Street, Pearl City, Honolulu County, HI
12. Jet Lowe, Photographer, June 1979. FIRST FLOOR INTERIOR LOOKING ...
12. Jet Lowe, Photographer, June 1979. FIRST FLOOR INTERIOR LOOKING NORTH. SHOWING SELF-RISING FLOUR BIN AND SALEM MACHINE WORKS' WHEAT ROLLER MILLS AND FLOUR BAGGER/COMPACTOR. - Womack's Mill, Yanceyville, Caswell County, NC
Interior of exercise room created by enclosing former dance floor. ...
Interior of exercise room created by enclosing former dance floor. - U.S. Naval Base, Pearl Harbor, Bloch Recreation Center & Arena, Between Center Drive & North Road near Nimitz Gate, Pearl City, Honolulu County, HI
10. Interior view, east shop, ground floor, looking northwest, showing ...
10. Interior view, east shop, ground floor, looking northwest, showing hardware storage rooms in tin shop area at right. - Larrabee & Hingston Company, Main Shop Building, 19 Howley Street, Peabody, Essex County, MA
22. TYPICAL FOR THE FIRST FLOOR INTERIORS, ARE PAIRED COLUMN ...
22. TYPICAL FOR THE FIRST FLOOR INTERIORS, ARE PAIRED COLUMN PILASTERS IN KEENE CEMENT PLASTER. BASE OF PILASTER IS SHOWN. - Pacific Telephone & Telegraph Company Building, 1519 Franklin Street, Oakland, Alameda County, CA
47. Interior view of the second floor, west side of ...
47. Interior view of the second floor, west side of the fireplace showing the louvered window in the gable, with scale - Kiskiack, Naval Mine Depot, State Route 238 vicinity, Yorktown, York County, VA
14. Interior view of the first floor, facing southwest, and ...
14. Interior view of the first floor, facing southwest, and showing elements of the cold storage refrigeration system attached to the ceiling. - Armour & Company Building, 100 Harris Avenue, Providence, Providence County, RI
Interior detail of main stairway from first floor; camera facing ...
Interior detail of main stairway from first floor; camera facing west. - Mare Island Naval Shipyard, Hospital Ward, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo, Solano County, CA
Interior detail of arched doorway at second floor; camera facing ...
Interior detail of arched doorway at second floor; camera facing north. - Mare Island Naval Shipyard, Hospital Ward, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo, Solano County, CA
Interior detail of stairway at first floor near main entry; ...
Interior detail of stairway at first floor near main entry; camera facing south. - Mare Island Naval Shipyard, WAVES Officers Quarters, Cedar Avenue, west side between Tisdale Avenue & Eighth Street, Vallejo, Solano County, CA
Interior view of typical room on second floor, west side; ...
Interior view of typical room on second floor, west side; camera facing north. - Mare Island Naval Shipyard, WAVES Officers Quarters, Cedar Avenue, west side between Tisdale Avenue & Eighth Street, Vallejo, Solano County, CA
7. FIRST FLOOR, INTERIOR, DETAIL OF FISH SMOKING OVEN LOCATED ...
7. FIRST FLOOR, INTERIOR, DETAIL OF FISH SMOKING OVEN LOCATED IN NORTH END OF BUILDING, ALONG WEST WALL; LOOKING WEST - Gerber Sheet Metal Works Building, 128 Porthand Avenue, South, Minneapolis, Hennepin County, MN
14. INTERIOR VIEW OF FIRST FLOOR ENTRY HALL, DOOR TO ...
14. INTERIOR VIEW OF FIRST FLOOR ENTRY HALL, DOOR TO LIVING ROOM AND DINING ROOM AT RIGHT, VIEW TO SOUTHEAST, ELECTRONIC FLASH ILLUMINATION. - Le Fevre House, 1444 Moore, Campbell, Santa Clara County, CA
10. Interior view of first floor showing 6 of 7 ...
10. Interior view of first floor showing 6 of 7 roller mills. All shown were manufactured by Allis-Chalmers. Wheel in foreground controls turbine speed. - Fisher-Fallgatter Mill, Waupaca, Waupaca County, WI
PBF (PER620) interior. Counting room, main floor. Date: May 2004. ...
PBF (PER-620) interior. Counting room, main floor. Date: May 2004. INEEL negative no. HD-41-6-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
15. Interior view of first floor aisle in 1904 middle ...
15. Interior view of first floor aisle in 1904 middle section. Camera pointed south from near juncture with 1922 north section. - Puget Sound Naval Shipyard, Pattern Shop, Farragut Avenue, Bremerton, Kitsap County, WA
Interior of the second floor dance hall showing tall and ...
Interior of the second floor dance hall showing tall and narrow window openings with 10-foot scale near center, looking south. - Bower Building, 409-413 East Weber Avenue, Stockton, San Joaquin County, CA
Interior detail of lobby terrazzo floor inlaid NPG insignia; camera ...
Interior detail of lobby terrazzo floor inlaid NPG insignia; camera facing west. - Mare Island Naval Shipyard, Defense Electronics Equipment Operating Center, I Street, terminus west of Cedar Avenue, Vallejo, Solano County, CA
BOILING HOUSE, INTERIOR, SECOND FLOOR, GARVER CLARIFIER IN FOREGROUND, TOPS ...
BOILING HOUSE, INTERIOR, SECOND FLOOR, GARVER CLARIFIER IN FOREGROUND, TOPS OF LONG TUBE EVAPORATORS IN BACKGROUND. VIEW FROM NORTHWEST - Kekaha Sugar Company, Sugar Mill Building, 8315 Kekaha Road, Kekaha, Kauai County, HI
INTERIOR VIEW OF BATHROOM 1 SHOWING THE MOSAICPATTERN TILE FLOOR. ...
INTERIOR VIEW OF BATHROOM 1 SHOWING THE MOSAIC-PATTERN TILE FLOOR. CERAMIC TILE WAINSCOT, AND CERAMIC ACCESSORIES. VIEW FACING NORTH. - Hickam Field, Officers' Housing Type H, 208 Sixth Street, Honolulu, Honolulu County, HI
13. Missile site control building, third and fourth floor interior, ...
13. Missile site control building, third and fourth floor interior, showing east corner and former electrical equipment area, room #306. This building was salvaged and sealed in the 1970's; the lower floors also suffered flooding - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND
9. 5TH FLOOR, INTERIOR DETAIL TO EAST OF SOAP BIN ...
9. 5TH FLOOR, INTERIOR DETAIL TO EAST OF SOAP BIN No. 4: UPPER SCREWS MOVED SOAP CHIPS HORIZONTALLY FROM BIN TO BIN; LOWER LEFT-AND RIGHT-HAND SCREWS MOVED CHIPS TO CHUTE LEADING TO 3RD FLOOR SOAP MILLS - Colgate & Company Jersey City Plant, Building No. B-14, 54-58 Grand Street, Jersey City, Hudson County, NJ
Second floor interior, showing northeast dormitory room in foreground and ...
Second floor interior, showing northeast dormitory room in foreground and southwest dormitory room in background. View to southeast - Fort David A. Russell, Artillery Barracks, Randall Avenue between Sixth & Fifth Streets, Cheyenne, Laramie County, WY
Second floor interior, showing northwest dormitory room in foreground and ...
Second floor interior, showing northwest dormitory room in foreground and southwest dormitory room in background. View to southeast - Fort David A. Russell, Artillery Barracks, Randall Avenue between Sixth & Fifth Streets, Cheyenne, Laramie County, WY
8. INTERIOR VIEW, FIRST FLOOR, NORTHEAST ROOM, EAST WALL, ORIGINAL ...
8. INTERIOR VIEW, FIRST FLOOR, NORTHEAST ROOM, EAST WALL, ORIGINAL KITCHEN FIREPLACE AND BAKE OVEN, WITH SCALE - Edgemont, 212 Bridgetown Pike, 1/4 mile East of PA 413 (Middletown Township), Langhorne, Bucks County, PA
INTERIOR DETAIL OF SECOND FLOOR DOORS AT NORTH END OF ...
INTERIOR DETAIL OF SECOND FLOOR DOORS AT NORTH END OF BUILDING; CAMERA FACING NORTH - Mare Island Naval Shipyard, Transportation Building & Gas Station, Third Street, south side between Walnut Avenue & Cedar Avenue, Vallejo, Solano County, CA
INTERIOR VIEW OF SECOND STORY SPACE LOOKING TOWARD SECOND FLOOR ...
INTERIOR VIEW OF SECOND STORY SPACE LOOKING TOWARD SECOND FLOOR DOORS; CAMERA FACING NORTH - Mare Island Naval Shipyard, Transportation Building & Gas Station, Third Street, south side between Walnut Avenue & Cedar Avenue, Vallejo, Solano County, CA
Interior view of typical ward on second floor, south wing; ...
Interior view of typical ward on second floor, south wing; camera facing northwest. - Mare Island Naval Shipyard, Hospital Headquarters, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo, Solano County, CA
Interior view of first floor lobby with detail of columns; ...
Interior view of first floor lobby with detail of columns; camera facing north. - Mare Island Naval Shipyard, Hospital Headquarters, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo, Solano County, CA
Interior detail of exit door on second floor at north ...
Interior detail of exit door on second floor at north end; camera facing north. - Mare Island Naval Shipyard, WAVES Officers Quarters, Cedar Avenue, west side between Tisdale Avenue & Eighth Street, Vallejo, Solano County, CA
Interior detail of bathroom on first floor north end, west ...
Interior detail of bathroom on first floor north end, west side, camera facing west. - Mare Island Naval Shipyard, WAVES Officers Quarters, Cedar Avenue, west side between Tisdale Avenue & Eighth Street, Vallejo, Solano County, CA
15. INTERIOR, FIRST FLOOR, NORTHWEST ROOM, SHOWING NORTH WALL WITH ...
15. INTERIOR, FIRST FLOOR, NORTHWEST ROOM, SHOWING NORTH WALL WITH DOORWAY AND EAST WALL WITH UPPER STAIRWAY - Storm King Ranger Station, U.S. Highway 101 vicinity, near Barnes Point, Port Angeles, Clallam County, WA
17. VIEW OF INTERIOR OF BUILDING 220 SECOND FLOOR, MALE ...
17. VIEW OF INTERIOR OF BUILDING 220 SECOND FLOOR, MALE MEDIUM SECURITY SLEEPING AREA. - U.S. Naval Base, Pearl Harbor, Brig, Neville Way near Ninth Street at Marine Barracks, Pearl City, Honolulu County, HI
29. SECOND FLOOR EAST SIDE APARTMENT EAST BEDROOM INTERIOR. ALUMINUMFRAME ...
29. SECOND FLOOR EAST SIDE APARTMENT EAST BEDROOM INTERIOR. ALUMINUM-FRAME SLIDING-GLASS WINDOWS ARE REPLACEMENTS. VIEW TO NORTHEAST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
INTERIOR VIEW OF FIRST FLOOR HALLWAY FROM THE EAST END ...
INTERIOR VIEW OF FIRST FLOOR HALLWAY FROM THE EAST END OF BUILDING 63, FACING WEST. - Naval Computer & Telecommunications Area Station, Enlisted Men's Barracks, West corner of Central Street & Midway Drive, Wahiawa, Honolulu County, HI
23. Interior view of SE corner of first floor of ...
23. Interior view of SE corner of first floor of 1896 south section of building, showing windows and column. Camera pointed SE. - Puget Sound Naval Shipyard, Pattern Shop, Farragut Avenue, Bremerton, Kitsap County, WA
25. Interior view of third floor attic of 1904 middle ...
25. Interior view of third floor attic of 1904 middle section showing concrete roof and storage of wooden patterns for ship parts. - Puget Sound Naval Shipyard, Pattern Shop, Farragut Avenue, Bremerton, Kitsap County, WA
BOILING HOUSE, INTERIOR, SECOND FLOOR, SYRUP TANKS IN RIGHT FOREGROUND, ...
BOILING HOUSE, INTERIOR, SECOND FLOOR, SYRUP TANKS IN RIGHT FOREGROUND, HIGH GRADE VACUUM PANS BEYOND THE SYRUP TANKS. VIEW FROM THE SOUTH - Kekaha Sugar Company, Sugar Mill Building, 8315 Kekaha Road, Kekaha, Kauai County, HI
17. Interior view, top floor, original bathroom and lockers, looking ...
17. Interior view, top floor, original bathroom and lockers, looking east. - New York, New Haven, & Hartford Railroad, Shell Interlocking Tower, New Haven Milepost 16, approximately 100 feel east of New Rochelle Junction, New Rochelle, Westchester County, NY
INTERIOR VIEW OF MIXER LOCATED ON SECOND FLOOR OF BATCH ...
INTERIOR VIEW OF MIXER LOCATED ON SECOND FLOOR OF BATCH PLANT. RECENTLY PURCHASED TO REPLACE OLD MIXER. USED TO MIX THE BATCH - Chambers-McKee Window Glass Company, Batch Plant, Clay Avenue Extension, Jeannette, Westmoreland County, PA
5. View of Community Hall, first floor interior, entrance hall ...
5. View of Community Hall, first floor interior, entrance hall on east side of building, facing southeast. Ticket booth center foreground, stairway to auditorium right foreground. - Community Hall, Rainier Avenue & View Drive, Port Gamble, Kitsap County, WA
Closet in room #17, bunkhouse, second floor interior. Originally a ...
Closet in room #17, bunkhouse, second floor interior. Originally a shelf and coat hooks, this was modified with a drawer and door, enclosing the open closet. - Sespe Ranch, Bunkhouse, 2896 Telegraph Road, Fillmore, Ventura County, CA
21. INTERIOR, DETAIL VIEW OF PARLOR, FIRST FLOOR, SOUTH ROOM, ...
21. INTERIOR, DETAIL VIEW OF PARLOR, FIRST FLOOR, SOUTH ROOM, NORTHWEST CORNER SHOWING PANELED WALLS AND PAINTING OVER DOORWAY (PAINTED BY FORMER RESIDENT, JULES DIEUDONNE) - Bostwick Hall, 3901 Forty-eighth Street, Bladensburg, Prince George's County, MD
Looking Southwest at First Floor View of Oxide Building Interior ...
Looking Southwest at First Floor View of Oxide Building Interior Including Steam Lines, Weigh and Sample Hood, and Superheater - Hematite Fuel Fabrication Facility, Oxide Building & Oxide Loading Dock, 3300 State Road P, Festus, Jefferson County, MO
INTERIOR SECOND FLOOR EAST END LOOKING WEST AT NORTH ROW ...
INTERIOR SECOND FLOOR- EAST END LOOKING WEST AT NORTH ROW OF MUSHROOM COLUMNS. - Colt Fire Arms Company, South Armory Building, 36-150 Huyshope Avenue, 17-170 Van Dyke Avenue, 49 Vredendale Avenue, Hartford, Hartford County, CT
INTERIOR FOURTH FLOOR, SOUTH HALF, LOOKING SOUTH. NOTE MUSHROOM COLUMNS ...
INTERIOR FOURTH FLOOR, SOUTH HALF, LOOKING SOUTH. NOTE MUSHROOM COLUMNS AND CEILING HAS WOODEN NAILERS. - Colt Fire Arms Company, North Armory, 36-150 Huyshope Avenue, 17-170 Van Dyke Avenue, 49 Vredendale Avenue, Hartford, Hartford County, CT
54. Interior view of second floor, looking at the enclosed ...
54. Interior view of second floor, looking at the enclosed fireplace at the south end of Kiskiack, with scale (duplicate of VA-183-49) - Kiskiack, Naval Mine Depot, State Route 238 vicinity, Yorktown, York County, VA
INTERIOR VIEW OF FIRST FLOOR SPACE AT NORTH END, LOOKING ...
INTERIOR VIEW OF FIRST FLOOR SPACE AT NORTH END, LOOKING AT WEST WALL; CAMERA FACING NORTHWEST. - Mare Island Naval Shipyard, Transportation Building & Gas Station, Third Street, south side between Walnut Avenue & Cedar Avenue, Vallejo, Solano County, CA
Interior view of office with fireplace on second floor off ...
Interior view of office with fireplace on second floor off south lobby; camera facing southeast. - Mare Island Naval Shipyard, Hospital Headquarters, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo, Solano County, CA
Interior view, detail view in first floor drawing room to ...
Interior view, detail view in first floor drawing room to show whale oil chandelier and ceiling medallion (duplicate of HABS No. MS-61-A-32) - Melrose, Main House, 1 Melrose-Montebello Parkway, Natchez, Adams County, MS
INTERIOR, FIRST FLOOR, A view looking toward the north wall ...
INTERIOR, FIRST FLOOR, A view looking toward the north wall of Room 164, showing the intricate mechanical systems which supported the operation - Department of Energy, Mound Facility, B Building, One Mound Road, Miamisburg, Montgomery County, OH
ETR, TRA642, CAMERA IS BELOW, BUT NEAR THE CEILING OF ...
ETR, TRA-642, CAMERA IS BELOW, BUT NEAR THE CEILING OF THE GROUND FLOOR, AND LOOKS DOWN TOWARD THE CONSOLE FLOOR. CAMERA FACES WESTERLY. THE REACTOR PIT IS IN THE CENTER OF THE VIEW. BEYOND IT TO THE LEFT IS THE SOUTH SIDE OF THE WORKING CANAL. IN THE FOREGROUND ON THE RIGHT IS THE SHIELDING FOR THE PROCESS WATER TUNNEL AND PIPING. SPIRAL STAIRCASE AT LEFT OF VIEW. INL NEGATIVE NO. 56-2237. Jack L. Anderson, Photographer, 7/6/1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
INTERIOR SHOWING STAIRCASE TO SECOND FLOOR FROM MAIN LOBBY/RECEPTION AREA, ...
INTERIOR SHOWING STAIRCASE TO SECOND FLOOR FROM MAIN LOBBY/RECEPTION AREA, VIEW FACING WEST-SOUTHWEST. - Naval Air Station Barbers Point, Control Tower & Aviation Operations Building, Near intersection of runways between Hangar 110 & Building 115, Ewa, Honolulu County, HI
1. FIRST FLOOR INTERIOR OF BUILDING No. 3 DETAIL ...
1. FIRST FLOOR INTERIOR OF BUILDING No. 3 - DETAIL OF WOOD FRAMING TO SHOW WOOD COLUMNS, WOOD GIRDERS AND BEAMS WITH COLUMN CAPS - ORIGINAL CONSTRUCTION - Whiting-Plover Paper Mill, Building No. 3, 3243 Whiting Road, Whiting, Portage County, WI
9. INTERIOR VIEW, FIRST FLOOR, NORTHEAST ROOM, EAST WALL, ORIGINAL ...
9. INTERIOR VIEW, FIRST FLOOR, NORTHEAST ROOM, EAST WALL, ORIGINAL KITCHEN FIREPLACE AND BAKE OVEN, WITH OPEN DOORWAY INTO CURRENT KITCHEN - Edgemont, 212 Bridgetown Pike, 1/4 mile East of PA 413 (Middletown Township), Langhorne, Bucks County, PA
8. FIRST FLOOR INTERIOR, ONE OF THREE MAIN REFRIGERATIONFREEZER ROOMS ...
8. FIRST FLOOR INTERIOR, ONE OF THREE MAIN REFRIGERATION-FREEZER ROOMS (NO. 4), FROM CENTRAL CORRIDOR OPPOSITE ENTRANCE, LOOKING WEST. - Oakland Naval Supply Center, Cold Storage Warehouse, South of C Street between First & Second Street, Oakland, Alameda County, CA
PLANING MILL, FIRST FLOOR INTERIOR, LOOKING SOUTH. THE LARGE DEVICE ...
PLANING MILL, FIRST FLOOR INTERIOR, LOOKING SOUTH. THE LARGE DEVICE IS A WHEEL BORING MACHINE USED DURING THE TIME THIS AREA WAS A WHEEL SHOP. - Southern Pacific, Sacramento Shops, Planing Mill, 111 I Street, Sacramento, Sacramento County, CA
Looking west, this interior photograph, taken in the second floor ...
Looking west, this interior photograph, taken in the second floor of E Building, demonstrates one of the typical corridors of the structure - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH
22. FIRST FLOOR APARTMENT SOUTH BEDROOM INTERIOR SHOWING PAIRED 6LIGHT ...
22. FIRST FLOOR APARTMENT SOUTH BEDROOM INTERIOR SHOWING PAIRED 6-LIGHT OVER 6-LIGHT DOUBLE-HUNG, WOOD-FRAMED WINDOWS. VIEW TO SOUTH. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, ...
14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, crib area of building, showing electrical and plumbing cribs, wall and ceiling detail, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
Stair and entry room, bunkhouse, first floor interior. Door from ...
Stair and entry room, bunkhouse, first floor interior. Door from entry hall leads to toilets and bathing rooms. A coat and hat rack is on each side of the door. - Sespe Ranch, Bunkhouse, 2896 Telegraph Road, Fillmore, Ventura County, CA
9. INTERIOR, SECOND FLOOR, NORTHSOUTH CORRIDOR IN WEST WING, FROM ...
9. INTERIOR, SECOND FLOOR, NORTH-SOUTH CORRIDOR IN WEST WING, FROM ITS INTERSECTION WITH MAIN EAST-WEST CORRIDOR AND NEAR STAIRWELL, LOOKING NORTH. - Oakland Naval Supply Center, Lodge-Cafeteria, East of Fifth Street, between D & E Streets, Oakland, Alameda County, CA
Interior view, Slave Quarter/Service Wing, first floor, east end, perspective ...
Interior view, Slave Quarter/Service Wing, first floor, east end, perspective view of the east chimney looking northwest (note ghost of mantel, nailing block - Decatur House, National Trust for Historic Preservation, 748 Jackson Place Northwest, Washington, District of Columbia, DC
15. FIRST FLOOR APARTMENT LIVING ROOM INTERIOR. OPEN DOORWAY AT ...
15. FIRST FLOOR APARTMENT LIVING ROOM INTERIOR. OPEN DOORWAY AT PHOTO CENTER OPENS TO KITCHEN. OPEN DOORWAY AT PHOTO LEFT OPENS TO BATHROOM. VIEW TO NORTHWEST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
14. Bottom floor, tower interior showing base of stairway to ...
14. Bottom floor, tower interior showing base of stairway to lantern; details shown of iron castings for newel post, railing, and stair treads and risers. - Block Island Southeast Light, Spring Street & Mohegan Trail at Mohegan Bluffs, New Shoreham, Washington County, RI
NASA Technical Reports Server (NTRS)
Pope, L. D.; Wilby, E. G.; Willis, C. M.; Mayes, W. H.
1983-01-01
As part of the continuing development of an aircraft interior noise prediction model, in which a discrete modal representation and power flow analysis are used, theoretical results are considered for inclusion of sidewall trim, stiffened structures, and cabin acoustics with floor partition. For validation purposes, predictions of the noise reductions for three test articles (a bare ring-stringer stiffened cylinder, an unstiffened cylinder with floor and insulation, and a ring-stringer stiffened cylinder with floor and sidewall trim) are compared with measurements.
Interior view of ground floor unit at west end of ...
Interior view of ground floor unit at west end of Building No. 23, looking from hallway into second bedroom. Looking south - Easter Hill Village, Building No. 23, North side of South Twenty-sixth Street, east of Corto Square, Richmond, Contra Costa County, CA
Interior view of ground floor unit at west end of ...
Interior view of ground floor unit at west end of Building No. 23, looking from hallway into first bedroom. Looking south - Easter Hill Village, Building No. 23, North side of South Twenty-sixth Street, east of Corto Square, Richmond, Contra Costa County, CA
Interior view of ground floor unit at west end of ...
Interior view of ground floor unit at west end of Building No. 23, looking from hallway into bathroom. Looking northwest - Easter Hill Village, Building No. 23, North side of South Twenty-sixth Street, east of Corto Square, Richmond, Contra Costa County, CA
24. SECOND FLOOR EAST SIDE APARTMENT LIVING ROOM INTERIOR SHOWING ...
24. SECOND FLOOR EAST SIDE APARTMENT LIVING ROOM INTERIOR SHOWING DOORWAY INTO KITCHEN AT PHOTO CENTER LEFT AND OPEN DOORWAY INTO BATHROOM AT PHOTO RIGHT. VIEW TO SOUTHWEST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
32. SECOND FLOOR WEST SIDE APARTMENT LIVING ROOM INTERIOR SHOWING ...
32. SECOND FLOOR WEST SIDE APARTMENT LIVING ROOM INTERIOR SHOWING DOORWAY INTO KITCHEN AT PHOTO CENTER RIGHT, AND OPEN DOORWAY IN BATHROOM AT PHOTO LEFT. VIEW TO SOUTHWEST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
Wash room, bunkhouse, first floor interior. This room is a ...
Wash room, bunkhouse, first floor interior. This room is a screened porch with the original sinks extant. Light and ventilation was borrowed from the wash room into the toilets and bathing rooms. - Sespe Ranch, Bunkhouse, 2896 Telegraph Road, Fillmore, Ventura County, CA
Interior view, Slave Quarter/Service, second floor, detail view of framing ...
Interior view, Slave Quarter/Service, second floor, detail view of framing to show joists (with ghosts of lathe) and header (trimmer) with keyed through tenon. - Decatur House, National Trust for Historic Preservation, 748 Jackson Place Northwest, Washington, District of Columbia, DC
13. Interior view on the fourth floor. A view looking ...
13. Interior view on the fourth floor. A view looking northwest showing a typical arrangement of lease space offices, with glass door, lavatory and clothes closets. - John T. Beasley Building, 632 Cherry Street (between Sixth & Seventh Streets), Terre Haute, Vigo County, IN
INTERIOR OF SECOND FLOOR CONTROL ROOM OF FUEL STORAGE BUILDING ...
INTERIOR OF SECOND FLOOR CONTROL ROOM OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTHWEST. INL PHOTO NUMBER HD-54-19-2. Mike Crane, Photographer, 8/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
INTERIOR VIEW OF THE ENTRY HALL AND STAIRS TO SECOND ...
INTERIOR VIEW OF THE ENTRY HALL AND STAIRS TO SECOND FLOOR. TAKEN FROM THE DINING ROOM. NOTE THE TONGUE-AND-GROOVE WOOD FLOORING AND THE TELEPHONE NICHE. VIEW FACING NORTHWEST. - Hickam Field, Officers' Housing Type L, 702 Julian Avenue, Honolulu, Honolulu County, HI
37. SECOND FLOOR WEST SIDE APARTMENT EAST BEDROOM INTERIOR SHOWING ...
37. SECOND FLOOR WEST SIDE APARTMENT EAST BEDROOM INTERIOR SHOWING PAIRED 6-LIGHT OVER 6-LIGHT DOUBLE-HUNG, WOOD-FRAME WINDOWS ON NORTH WALL. VIEW TO NORTHEAST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
Launch of Space Shuttle Atlantis / STS-129 Mission
2009-11-16
STS129-S-055 (16 Nov. 2009) --- The space shuttle launch team monitors the progress of Space Shuttle Atlantis' countdown from consoles on the main floor of Firing Room 4 in Kennedy's Launch Control Center. Liftoff of Atlantis from Launch Pad 39A on its STS-129 mission to the International Space Station came at 2:28 p.m. (EST) Nov. 16, 2009.
4. FIRST FLOOR INTERIOR, AMMONIA COMPRESSION DYNAMOS IN MACHINERY ROOM ...
4. FIRST FLOOR INTERIOR, AMMONIA COMPRESSION DYNAMOS IN MACHINERY ROOM ALONG SOUTH SIDE OF WESTERN PORTION OF BUILDING, FROM EASTERN ENTRANCE TO MACHINERY ROOM, LOOKING WEST. - Oakland Naval Supply Center, Cold Storage Warehouse, South of C Street between First & Second Street, Oakland, Alameda County, CA
Interior view, secondfloor corridor looking east. Note the door to ...
Interior view, second-floor corridor looking east. Note the door to Egyptian Hall in the center distance and the door to Gothic Hall on the eastern entresol (third floor) at the top of the stairs - Masonic Temple, 1 North Broad Street, Philadelphia, Philadelphia County, PA
11. Interior view of first floor of 1922 north section, ...
11. Interior view of first floor of 1922 north section, showing east wall and windows at far north end of building. Camera pointed E. Rear of building is partially visible on far left. - Puget Sound Naval Shipyard, Pattern Shop, Farragut Avenue, Bremerton, Kitsap County, WA
16. FIRST FLOOR APARTMENT KITCHEN INTERIOR SHOWING OPEN DOORWAY TO ...
16. FIRST FLOOR APARTMENT KITCHEN INTERIOR SHOWING OPEN DOORWAY TO LIVING ROOM AND PAIRED 6-LIGHT OVER 6-LIGHT DOUBLE-HUNG, WOOD-FRAME WINDOWS OVER SINK. VIEW TO EAST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
Ait Bamai, Yu; Araki, Atsuko; Kawai, Toshio; Tsuboi, Tazuru; Saito, Ikue; Yoshioka, Eiji; Kanazawa, Ayako; Tajima, Shuji; Shi, Cong; Tamakoshi, Akiko; Kishi, Reiko
2014-01-15
Phthalates are widely used as plasticizers in numerous products. However, there has been some concern about the various effects they may have on human health. Thus, household phthalate levels are an important public health issue. While many studies have assessed phthalate levels in house dust, the association of these levels with building characteristics has scarcely been examined. The present study investigated phthalate levels in house dust samples collected from the living areas of homes, and examined associations between these phthalate levels and the interior materials. Dust was collected from two portions of the living area: floor dust from the entire floor surface, and multi-surface dust from objects more than 35 cm above the floor. The levels of seven phthalates were measured using gas chromatography/mass spectrometry in selective ion monitoring mode. Phthalate levels were higher in multi-surface dust than in floor dust. Among floor dust samples, those from dwellings with compressed wooden flooring had significantly higher levels of di-iso-butyl phthalate compared to those with other floor materials, while polyvinyl chloride (PVC) flooring was associated with higher di-2-ethylhexyl phthalate (DEHP) levels. Among multi-surface dust samples, higher levels of DEHP and di-iso-nonyl phthalate (DINP) were found in samples from homes with PVC wallpaper than without. The number of PVC interior materials was significantly positively correlated with the levels of DEHP and DINP in multi-surface dust. The phthalate levels in multi-surface dust were associated with the interior surface materials, and those in floor dust were directly related to the flooring materials. Our findings show that when using house dust as an exposure assessment, it is very important to note where the samples were collected from. The present report provides useful information about the association between phthalates and dust inside dwellings, which will assist with establishing public health provisions. © 2013. Published by Elsevier B.V. All rights reserved.
A&M. TAN607. Interior view of operating gallery in hot shop. ...
A&M. TAN-607. Interior view of operating gallery in hot shop. Shielded viewing windows are along right side of corridor. Cabinet on wheels at left of corridor is operating console for hot shop manipulators. When in use, it is stationed at window station and connected to appropriate control cables. note reserve bottles of zinc bromide above each station. Date: January 3, 1955. INEEL negative no. 55-0072 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
34. SECOND FLOOR WEST SIDE APARTMENT KITCHEN INTERIOR. DOORWAY AT ...
34. SECOND FLOOR WEST SIDE APARTMENT KITCHEN INTERIOR. DOORWAY AT PHOTO LEFT LEADS TO PANTRY. GROUP OF THREE 6-LIGHT WOOD-FRAME CASEMENT WINDOWS OPEN TO WALKWAY AT REAR OF BUILDING. VIEW TO SOUTH. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
5. Interior of second floor of Dixie Cotton Mill, view ...
5. Interior of second floor of Dixie Cotton Mill, view facing east. Again note the change in column type and roof structure from the 1913 addition (foreground) to a portion of the original 1895 structure (background). - Dixie Cotton Mill, 710 Greenville Street, La Grange, Troup County, GA
48. Interior view of the second floor, looking from the ...
48. Interior view of the second floor, looking from the northeast to the southwest generally (note common rafter roof and collar beams as well as the ghosts of dormer windows in the west side - Kiskiack, Naval Mine Depot, State Route 238 vicinity, Yorktown, York County, VA
INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR DEPICTING DETAIL ...
INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR DEPICTING DETAIL OF SHIELDED CAVE (CPP-640) LOOKING SOUTHWEST. PHOTO TAKEN FROM NORTH. INL PHOTO NUMBER HD-54-40-2. Mike Crane, Photographer, 7/2006 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR WITH SOUTH ...
INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR WITH SOUTH SECTION OF SHIELDED CAVE IN FOREGROUND (CPP-640) LOOKING NORTHWEST. INL PHOTO NUMBER HD-54-40-1. Mike Crane, Photographer, 7/2006 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
INTERIOR OF JENNE BARN GROUND FLOOR. (The Jenne milking stanchions ...
INTERIOR OF JENNE BARN GROUND FLOOR. (The Jenne milking stanchions can be seen on the left. The space that originally served as the milking parlor has now been converted into animal pens for goats, chickens, and pigs.) - Jenne Farm, Barn, 538 Engle Road, Coupeville, Island County, WA
36. SECOND FLOOR WEST SIDE APARTMENT EAST BEDROOM INTERIOR. OPEN ...
36. SECOND FLOOR WEST SIDE APARTMENT EAST BEDROOM INTERIOR. OPEN DOORWAY AT PHOTO LEFT CENTER LEADS TO CLOSET, AND OPEN DOORWAY AT PHOTO RIGHT CENTER LEADS TO LIVING ROOM. VIEW TO SOUTH. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
12. Interior view of first floor aisle in 1922 north ...
12. Interior view of first floor aisle in 1922 north section. Camera is pointed south from rear of building. Post at far left is also seen on right in photo WA-116-A-11. - Puget Sound Naval Shipyard, Pattern Shop, Farragut Avenue, Bremerton, Kitsap County, WA
23. SECOND FLOOR EAST SIDE APARTMENT LIVING ROOM INTERIOR. PAIRED ...
23. SECOND FLOOR EAST SIDE APARTMENT LIVING ROOM INTERIOR. PAIRED 4-LIGHT OVER 1-LIGHT DOUBLE-HUNG, WOOD-FRAME WINDOWS FLANK ENTRY DOOR. DOORWAY AT PHOTO RIGHT OPENS TO KITCHEN. VIEW TO SOUTHEAST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
38. SECOND FLOOR WEST SIDE APARTMENT WEST BEDROOM INTERIOR SHOWING ...
38. SECOND FLOOR WEST SIDE APARTMENT WEST BEDROOM INTERIOR SHOWING PAIRED 6-LIGHT OVER 6-LIGHT DOUBLE-HUNG, WOOD-FRAME WINDOWS ON WEST WALL AND OPEN DOORWAY TO LIVING ROOM. VIEW TO WEST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
33. SECOND FLOOR WEST SIDE APARTMENT KITCHEN INTERIOR. 6LIGHT PANEL ...
33. SECOND FLOOR WEST SIDE APARTMENT KITCHEN INTERIOR. 6-LIGHT PANEL DOOR AND 6-LIGHT CASEMENT WINDOW AT PHOTO CENTER AND PHOTO RIGHT RESPECTIVELY OPEN TO EXTERIOR STAIRWAY LANDING. VIEW TO WEST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
West wall, display area (room 101), view 1 of 4: ...
West wall, display area (room 101), view 1 of 4: southwest corner, showing stairs to commander's quarters and viewing bridge, windows to controller's room (room 102), south end of control consoles, and holes in pedestal floor for computer equipment cables (tape drive I/O?) - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
Northeastern Exterior, Northwestern Exterior, & Southwestern Exterior Elevations, Northeastern Interior, Southeastern Interior, & Southwestern Interior Elevations, Floor Plan, and Eastern Corner Detail - Manatoc Reservation, Vale Edge Adirondack, 1075 Truxell Road, Peninsula, Summit County, OH
PROCESS WATER BUILDING, TRA605, INTERIOR. FIRST FLOOR. ELECTRICAL EQUIPMENT IN ...
PROCESS WATER BUILDING, TRA-605, INTERIOR. FIRST FLOOR. ELECTRICAL EQUIPMENT IN LEFT HALF OF VIEW. CAMERA IS IN NORTHWEST CORNER FACING SOUTHEAST. INL NEGATIVE NO. HD46-27-1. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
ETR BUILDING, TRA642, INTERIOR. FIRST FLOOR. INSIDE UTILITY CORRIDOR ALONG ...
ETR BUILDING, TRA-642, INTERIOR. FIRST FLOOR. INSIDE UTILITY CORRIDOR ALONG SOUTH PERIMETER WALL (COMMON TO ELECTRICAL BUILDING, TRA-648). CAMERA FACES WEST. INL NEGATIVE NO. HD46-16-2. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
31. INTERIOR VIEW TO THE EAST OF THE FIRST FLOOR ...
31. INTERIOR VIEW TO THE EAST OF THE FIRST FLOOR SOUTH CORRIDOR AND VIEWING GALLERY TO THE DISASSEMBLY BAY AND POST-MORTEM CELLS. VIEWING STATIONS ARE ON BOTH SIDES OF THE CORRIDOR. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
38. INTERIOR VIEW TO THE NORTHWEST OF THE SECOND FLOOR ...
38. INTERIOR VIEW TO THE NORTHWEST OF THE SECOND FLOOR CORRIDOR ON THE SOUTH SIDE OF THE DISASSEMBLY BAY. VIEWING AND WORK STATIONS ARE ALONG THE NORTH WALL OF THE CORRIDOR. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
24. Interior view of entrance corridor looking down east corridor; ...
24. Interior view of entrance corridor looking down east corridor; showing unoccupied corner office space and stairs going down to lower floor; center of main section of building on main floor; view to northeast. - Ellsworth Air Force Base, Group Administration & Secure Storage Building, 2372 Westover Avenue, Blackhawk, Meade County, SD
27. Interior view of the first floor of Kiskiack, looking ...
27. Interior view of the first floor of Kiskiack, looking from the southeast corner to the door and past it to northeastern corner of the house (note position of joists as told by the holes left behind in the foundation wall) - Kiskiack, Naval Mine Depot, State Route 238 vicinity, Yorktown, York County, VA
INTERIOR VIEW OF EAST CORNER OF SECOND FLOOR SHOWING CLERESTORY ...
INTERIOR VIEW OF EAST CORNER OF SECOND FLOOR SHOWING CLERESTORY WINDOWS. VIEW FACING SOUTHEAST - U.S. Naval Base, Pearl Harbor, Ford Island Polaris Missile Lab & U.S. Fleet Ballistic Missile Submarine Training Center, Between Lexington Boulvevard and the sea plane ramps on the southwest side of Ford Island, Pearl City, Honolulu County, HI
MTR WING A, TRA604, INTERIOR. MAIN FLOOR. DETAIL VIEW INSIDE ...
MTR WING A, TRA-604, INTERIOR. MAIN FLOOR. DETAIL VIEW INSIDE LABORATORY 114. CAMERA FACING NORTH. DISPOSAL OF RADIOACTIVE MATERIALS IS UNDERWAY. INL NEGATIVE NO. HD46-12-4. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
9. GENERAL INTERIOR VIEW OF BEEF KILLING FLOOR; LOOKING SOUTHEAST; ...
9. GENERAL INTERIOR VIEW OF BEEF KILLING FLOOR; LOOKING SOUTHEAST; PLATFORMS IN FOREGROUND WERE USED BY SPLITTERS, TRIMMERS AND GOVERNMENT INSPECTORS; SKINNING TABLE RAN ALONG THE WINDOWS NEAR THE CENTER OF THE PHOTO - Rath Packing Company, Beef Killing Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA
6. INTERIOR OF NORTH END OF STEAM PLANT, GROUND FLOOR, ...
6. INTERIOR OF NORTH END OF STEAM PLANT, GROUND FLOOR, SHOWING FORMER LOCATION OF DIESEL ENGINES. THIS WAS THE FIRST PART OF THE BUILDING TO BE CONSTRUCTED, WHEN IT HOUSED ONLY THE DIESEL ENGINES. December 4, 1990 - Crosscut Steam Plant, North side Salt River near Mill Avenue & Washington Street, Tempe, Maricopa County, AZ
30. SECOND FLOOR EAST SIDE APARTMENT WEST BEDROOM INTERIOR SHOWING ...
30. SECOND FLOOR EAST SIDE APARTMENT WEST BEDROOM INTERIOR SHOWING PAIRED 6-LIGHT OVER 6-LIGHT DOUBLE-HUNG, WOOD-FRAME WINDOWS THROUGH NORTH WALL. ORIGINAL LOUVERED DOORS FRAME CLOSET AT PHOTO LEFT. VIEW TO NORTH. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
20. FIRST FLOOR APARTMENT NORTH BEDROOM INTERIOR LOOKING THROUGH DOOR ...
20. FIRST FLOOR APARTMENT NORTH BEDROOM INTERIOR LOOKING THROUGH DOOR FROM LIVING ROOM. GROUP OF THREE 6-LIGHT OVER 6-LIGHT DOUBLE-HUNG, WOOD-FRAME WINDOWS AT PHOTO CENTER THROUGH NORTH (FRONT) WALL OF HOUSE. VIEW TO EAST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
NASA Technical Reports Server (NTRS)
Pope, L. D.; Wilby, E. G.
1982-01-01
An airplane interior noise prediction model is developed to determine the important parameters associated with sound transmission into the interiors of airplanes, and to identify apropriate noise control methods. Models for stiffened structures, and cabin acoustics with floor partition are developed. Validation studies are undertaken using three test articles: a ring stringer stiffened cylinder, an unstiffened cylinder with floor partition, and ring stringer stiffened cylinder with floor partition and sidewall trim. The noise reductions of the three test articles are computed using the heoretical models and compared to measured values. A statistical analysis of the comparison data indicates that there is no bias in the predictions although a substantial random error exists so that a discrepancy of more than five or six dB can be expected for about one out of three predictions.
Constraints on the Volatile Distribution Within Shackleton Crater at the Lunar South Pole
NASA Technical Reports Server (NTRS)
Zuber, Maria T.; Head, James W.; Smith, David E.; Neumann, Gregory A.; Mazarico, Erwan; Torrence, Mark H.; Aharonson, Oded; Tye, Alexander R.; Fassett, Caleb I.; Rosenburg, Margaret A.;
2012-01-01
Shackleton crater is nearly coincident with the Moon's south pole. Its interior receives almost no direct sunlight and is a perennial cold trap, making Shackleton a promising candidate location in which to seek sequestered volatiles. However, previous orbital and Earth-based radar mapping and orbital optical imaging have yielded conflicting interpretations about the existence of volatiles. Here we present observations from the Lunar Orbiter Laser Altimeter on board the Lunar Reconnaissance Orbiter, revealing Shackleton to be an ancient, unusually well-preserved simple crater whose interior walls are fresher than its floor and rim. Shackleton floor deposits are nearly the same age as the rim, suggesting that little floor deposition has occurred since the crater formed more than three billion years ago. At a wavelength of 1,064 nanometres, the floor of Shackleton is brighter than the surrounding terrain and the interiors of nearby craters, but not as bright as the interior walls. The combined observations are explicable primarily by downslope movement of regolith on the walls exposing fresher underlying material. The relatively brighter crater floor is most simply explained by decreased space weathering due to shadowing, but a one-micrometre-thick layer containing about 20 per cent surficial ice is an alternative possibility.
Interior view of ground floor unit at west end of ...
Interior view of ground floor unit at west end of Building No. 23, looking from front door with kitchen on left, living room to right, bedrooms and bath at center rear. Looking east - Easter Hill Village, Building No. 23, North side of South Twenty-sixth Street, east of Corto Square, Richmond, Contra Costa County, CA
12. BUILDING 621, INTERIOR, GROUND FLOOR, LOOKING NORTHWEST AT SCREENING ...
12. BUILDING 621, INTERIOR, GROUND FLOOR, LOOKING NORTHWEST AT SCREENING MACHINE THAT REMOVES SHELL FRAGMENTS. METALLIC DUST REMOVED BY MAGNETIC SEPERATOR UNDERNEATH SCREEN. SAWDUST IS RETURNED TO SAWDUST HOPPER BY ELEVATOR. HOODS OVER SCREENING MACHINE AT WORKBENCH REMOVE FINE SAWDUST. - Picatinny Arsenal, 600 Area, Test Areas District, State Route 15 near I-80, Dover, Morris County, NJ
21. INTERIOR VIEW, UNDER THE MAIN FLOOR SHOWING THE LINESHAFT ...
21. INTERIOR VIEW, UNDER THE MAIN FLOOR SHOWING THE LINESHAFT SYSTEM ONCE POWERED BY A STEAM ENGINE AND LATER BY TWO LARGE ELECTRICAL MILL MOTORS (NOTICE LARGE GEAR IN FOREGROUND) THAT OPERATED EACH NAIL MACHINE; PRESENTLY THE NAIL MACHINES ARE DRIVEN BY INDIVIDUAL ELECTRICAL MOTORS - LaBelle Iron Works, Thirtieth & Wood Streets, Wheeling, Ohio County, WV
Interior view of north end of first floor of Express ...
Interior view of north end of first floor of Express Building Mail Room, facing east. Toilet rooms are on right, and Lunch Room with surveillance gallery above it is on left. Enclosed stairs is at back of photograph - Southern Pacific Railroad Depot, Railroad Terminal Post Office & Express Building, Fifth & I Streets, Sacramento, Sacramento County, CA
31. SECOND FLOOR WEST SIDE APARTMENT LIVING ROOM INTERIOR SHOWING ...
31. SECOND FLOOR WEST SIDE APARTMENT LIVING ROOM INTERIOR SHOWING PAIRED 4-LIGHT OVER 4-LIGHT DOUBLE-HUNG, WOOD-FRAME WINDOWS FLANKING ENTRY DOOR WITH UNUSUAL 8-LIGHT WINDOW. OPEN DOORWAY TO PHOTO LEFT LEADS TO KITCHEN. VIEW TO WEST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
MTR MAIN FLOOR. NEUTRON TUNNEL (SPANNED BY STILELIKE STEPS) PROJECTS ...
MTR MAIN FLOOR. NEUTRON TUNNEL (SPANNED BY STILE-LIKE STEPS) PROJECTS FROM THE SOUTHEAST CORNER OF THE MTR TOWARD SOUTHEAST CORNER OF BUILDING, WHERE SHIELDING BLOCKS BEGIN TO SURROUND THE TUNNEL AS IT NEARS DETECTING INSTRUMENTS NEAR THE BUILDING WALL. GEAR RELATED TO CRYSTAL NEUTRON SPECTROMETER IS IN FOREGROUND SURROUNDED BY SHIELDING. DATA CONSOLES ARE AT MID-LEVEL OF EAST FACE. OTHER WORK PROCEEDS ON TOP OF AND ELSEWHERE AROUND REACTOR. NOTE TOOLS HANGING AGAINST SOUTHEAST CORNER, USED TO CHANGE FUEL ELEMENTS AND OTHER REACTOR ITEMS DURING REFUELING CYCLES. INL NEGATIVE NO. 10439. Unknown Photographer, 4/20/1954 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
ETRCF, TRA654, INTERIOR. CAMERA IS ON MAIN FLOOR. NOTE CRANE ...
ETR-CF, TRA-654, INTERIOR. CAMERA IS ON MAIN FLOOR. NOTE CRANE HOOKS. ELECTRICAL EQUIPMENT IS PART OF PAST EXPERIMENT. DOOR AT LEFT EDGE OF VIEW LEADS TO REACTOR SERVICE BUILDING, TRA-635. INL NEGATIVE NO. HD24-1-2. Mike Crane, Photographer, ca. 2003 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
ETR BUILDING, TRA642, INTERIOR. FIRST FLOOR. REACTOR IS IN CENTER ...
ETR BUILDING, TRA-642, INTERIOR. FIRST FLOOR. REACTOR IS IN CENTER OF VIEW. CAMERA FACES NORTHWEST. NOTE CRANE RAILS AND DANGLING ELECTRICAL CABLE AT UPPER PART OF VIEW FOR "MOFFETT 2 TON" CRANE. INL NEGATIVE NO. HD46-14-4. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
25. SECOND FLOOR EAST SIDE APARTMENT KITCHEN INTERIOR SHOWING GROUP ...
25. SECOND FLOOR EAST SIDE APARTMENT KITCHEN INTERIOR SHOWING GROUP OF THREE 6-LIGHT WOOD-FRAME CASEMENT WINDOWS OVER THE SINK, AND OPEN DOORWAY TO TOP OF EXTERIOR STAIR LANDING AND WALKWAY AT REAR OF HOUSE. WALKWAY IS VISIBLE THROUGH KITCHEN WINDOWS. VIEW TO SOUTH. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
INTERIOR VIEW OF THE LIVING ROOM SHOWING THE FLOOR TO ...
INTERIOR VIEW OF THE LIVING ROOM SHOWING THE FLOOR TO CEILING WINDOWS. NOTE THE OPENING IN THE RIGHT SIDE WALL FOR AN AIR CONDITIONER. VIEW FACING SOUTHWEST - Camp H.M. Smith and Navy Public Works Center Manana Title VII (Capehart) Housing, U-Shaped Three-Bedroom Duplex Type 3, Acacia Road, Birch Circle, and Cedar Drive, Pearl City, Honolulu County, HI
36. INTERIOR VIEW TO THE NORTHWEST OF THE SECOND FLOOR ...
36. INTERIOR VIEW TO THE NORTHWEST OF THE SECOND FLOOR CORRIDOR ON THE EAST SIDE OF THE DISASSEMBLY BAY. A VIEWING AND WORK STATION AND ENTRANCE TO THE CONTROL ROOM ARE ON THE WEST SIDE OF THE CORRIDOR. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
25. INTERIOR VIEW LOOKING SOUTH IN THE ORE RECEIVING LEVEL ...
25. INTERIOR VIEW LOOKING SOUTH IN THE ORE RECEIVING LEVEL SHOWING THE TRAMWAY TRACKS IN THE FLOOR, ORE CHUTES IN THE FLOOR, NEWER TRACKS COMING IN FROM THE TRESTLE ON THE EAST SIDE OF THE MILL., AND THE WINDING DRUM THE TRAMWAY IN THE BACKGROUND. - Standard Gold Mill, East of Bodie Creek, Northeast of Bodie, Bodie, Mono County, CA
DETAIL OF INTERIOR OF MISSILE TUBE AT GROUND FLOOR LEVEL ...
DETAIL OF INTERIOR OF MISSILE TUBE AT GROUND FLOOR LEVEL SHOWING AIR COMPRESSOR TANKS AND CURVING STEEL PIECE. VIEW FACING EAST - U.S. Naval Base, Pearl Harbor, Ford Island Polaris Missile Lab & U.S. Fleet Ballistic Missile Submarine Training Center, Between Lexington Boulvevard and the sea plane ramps on the southwest side of Ford Island, Pearl City, Honolulu County, HI
14. INTERIOR VIEW OF THIRD FLOOR OF FACTORY ADDITION, NORTHWEST ...
14. INTERIOR VIEW OF THIRD FLOOR OF FACTORY ADDITION, NORTHWEST CORNER OF BUILDING. AT THE CENTER IS THE BUFFING MACHINE, MANUFACTURED BY THE ACME CO. OF DETROIT, MICHIGAN. IT WAS HERE THAT ALUMINUM WARES WERE BROUGHT FOR FINAL GRINDING AND BUFFING. THE HOSES REMOVED DUST AND DEBRIS. - Illinois Pure Aluminum Company, 109 Holmes Street, Lemont, Cook County, IL
INTERIOR VIEW OF SOUTHWEST WALL OF SECOND FLOOR SHOWING WINDOWS, ...
INTERIOR VIEW OF SOUTHWEST WALL OF SECOND FLOOR SHOWING WINDOWS, SLIDING DOORS AND METAL ROOF FRAMING. VIEW FACING SOUTHWEST - U.S. Naval Base, Pearl Harbor, Ford Island Polaris Missile Lab & U.S. Fleet Ballistic Missile Submarine Training Center, Between Lexington Boulvevard and the sea plane ramps on the southwest side of Ford Island, Pearl City, Honolulu County, HI
16. Interior view on first floor in 1904 middle section, ...
16. Interior view on first floor in 1904 middle section, east side, showing various machinery, including Post Lathe (Bull Lathe) with Large wheel and smaller lathe on left. Camera pointed S on east side building. See photos WA-116-A-17 through WA-116-A-20. - Puget Sound Naval Shipyard, Pattern Shop, Farragut Avenue, Bremerton, Kitsap County, WA
20. VIEW TO WEST OF INTERIOR OF CRANEWAY WITH TOW ...
20. VIEW TO WEST OF INTERIOR OF CRANEWAY WITH TOW TRAVELING BRIDGE CRANES (ONE OVERHEAD IN FOREGROUND AND ONE OVERHEAD IN BACKGROUNDS). NOTE WOOD BLOCK PAVING ON THE FLOOR. FIRST FLOOR ASSEMBLY AREA IS THE SPACE IN THE BACKGROUND ON THE RIGHT. - Rosie the Riveter National Historical Park, Ford Assembly Plant, 1400 Harbour Way South, Richmond, Contra Costa County, CA
Igneous intrusion models for floor fracturing in lunar craters
NASA Technical Reports Server (NTRS)
Wichman, R. W.; Schultz, P. H.
1991-01-01
Lunar floor-fractured craters are primarily located near the maria and frequently contain ponded mare units and dark mantling deposits. Fracturing is confined to the crater interior, often producing a moat-like feature near the floor edge, and crater depth is commonly reduced by uplift of the crater floor. Although viscous relaxation of crater topography can produce such uplift, the close association of modification with surface volcanism supports a model linking floor fracture to crater-centered igneous intrusions. The consequences of two intrusion models for the lunar interior are quantitatively explored. The first model is based on terrestrial laccoliths and describes a shallow intrusion beneath the crater. The second model is based on cone sheet complexes where surface deformation results from a deeper magma chamber. Both models, their fit to observed crater modifications and possible implications for local volcanism are described.
Chemistry of burning the forest floor during the FROSTFIRE experimental burn, interior Alaska, 1999.
J.W. Harden; J.C. Neff; D.V. Sandberg; M.R. Turetsky; R. Ottmar; G. Gleixner; T.L. Fries; K.L. Manies
2004-01-01
Wildfires represent one of the most common disturbances in boreal regions, and have the potential to reduce C, N, and Hg stocks in soils while contributing to atmospheric emissions. Organic soil layers of the forest floor were sampled before and after the FROSTFIRE experimental burn in interior Alaska, and were analyzed for bulk density, major and trace elements, and...
32. INTERIOR VIEW TO THE NORTH OF THE FIRST FLOOR ...
32. INTERIOR VIEW TO THE NORTH OF THE FIRST FLOOR EAST CORRIDOR AND VIEWING GALLERY TO THE DISASSEMBLY BAY. A VIEWING AND WORK STATION FOR THE EAST SIDE OF THE UPPER LEVEL OF THE DISASSEMBLY BAY IS ON THE WEST SIDE OF THE CORRIDOR. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
12. INTERIOR VIEW, FIRST FLOOR SHOWING GRINDING STONES COVERED WITH ...
12. INTERIOR VIEW, FIRST FLOOR SHOWING GRINDING STONES COVERED WITH VATS (RIGHT STONE RUN BY 35' LEFFAL VERTICAL TURBINE; LEFT BY 23' 1EFFAL VERTICAL TURBINE). THE HOPPER ON THE VAT TO THE LEFT FUNNELS THE GRAIN IN. THE CHUTE AT THE BOTTOM OF THE CENTER VAT SENDS GROUND GRAIN TO THE CONVEYOR BELOW. - Schech's Mill, Beaver Creek State Park, La Crescent, Houston County, MN
INTERIOR VIEW, CENTER CHAMBER OVER THE SALOON FROM THE NORTH. ...
INTERIOR VIEW, CENTER CHAMBER OVER THE SALOON FROM THE NORTH. THE DOORS ON THE RIGHT CONCEAL CLOSETS. THIS SECTION OF THE HOUSE WAS PART OF THE ORIGINAL CA. 1770 CONSTRUCTION. THE FLOOR-LEVEL WINDOW RESULTED FROM THE 1780S RECONCEPTION OF THE HOUSE WHICH INCLUDED RAISING THE FLOOR TO ACCOMMODATE THE SALOONS CEILING - The Woodlands, 4000 Woodlands Avenue, Philadelphia, Philadelphia County, PA
19. VIEW OF INTERIOR OF BUILDING 220 SECOND FLOOR, FROM ...
19. VIEW OF INTERIOR OF BUILDING 220 SECOND FLOOR, FROM THE FEMALE MEDIUM SECURITY AREA FACING THE FEMALE MEDIUM SECURITY SLEEPING AREA. THE FEMALE CELL BLOCK DOOR IN SHOWN ON THE RIGHT OF PHOTO. THE SLEEPING AREA IS IN THE CENTER OF PHOTO. - U.S. Naval Base, Pearl Harbor, Brig, Neville Way near Ninth Street at Marine Barracks, Pearl City, Honolulu County, HI
14. FIRST FLOOR APARTMENT LIVING ROOM INTERIOR. FRONT ENTRY DOOR ...
14. FIRST FLOOR APARTMENT LIVING ROOM INTERIOR. FRONT ENTRY DOOR IS AT PHOTO CENTER FLANKED BY A PAIRED 4-LIGHT OVER 4-LIGHT DOUBLE-HUNG, WOOD-FRAME WINDOWS. OPEN DOORWAY TO PHOTO RIGHT OPENS TO NORTH BEDROOM. DOORWAY TO PHOTO LEFT OPENS TO KITCHEN. VIEW TO NORTHEAST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA
25. INTERIOR VIEW ON THE GENERATOR FLOOR OF THE SOAPSTONE ...
25. INTERIOR VIEW ON THE GENERATOR FLOOR OF THE SOAPSTONE PANELS THAT CONTAIN INSTRUMENTS TO MONITIOR AND CONTROL THE OUTPUT OF THE GENERTATORS. IN THE FOREGROUND RIGHT ARE ADJUSTABLE FIELD RESISTORS TO CONTROL THE OVERALL POWER OUTPUT OF THE MAIN GENERATOR VIA THE EXCITER GENERATOR. - Potomac Power Plant, On West Virginia Shore of Potomac River, about 1 mile upriver from confluence with Shenandoah River, Harpers Ferry, Jefferson County, WV
TRITIUM LABORATORY, TRA666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT ...
TRITIUM LABORATORY, TRA-666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT CENTER OF VIEW. SIGN ABOVE DOOR SAYS "HYDRAULIC TEST FACILITY CONTROL ROOM." SIGN IN WINDOW SAYS "EATING AREA." "EVACUATION AND EMERGENCY INFORMATION" IS POSTED ON CABINET AT LEFT OF VIEW. INL NEGATIVE NO. HD30-2-3. Mike Crane, Photographer, 6/2001 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
4. Interior of second floor of Dixie Cotton Mill, view ...
4. Interior of second floor of Dixie Cotton Mill, view facing west. This area is now designated the upstairs yarn storage room. Note the change of column type and roof structure from the first to second column in foreground of photograph. The round columns were used in the 1913 addition to the original 1895 structure. - Dixie Cotton Mill, 710 Greenville Street, La Grange, Troup County, GA
41. Interior view of roof and wall below, looking to ...
41. Interior view of roof and wall below, looking to the east from the second floor landing at the junction of the common rafters to the raising plate, or false plate (note the false plate does not rest on the brick wall, instead is lapped over tie beams that support the floor & framing of the second level) - Kiskiack, Naval Mine Depot, State Route 238 vicinity, Yorktown, York County, VA
Nuclear reactor cavity floor passive heat removal system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edwards, Tyler A.; Neeley, Gary W.; Inman, James B.
A nuclear reactor includes a reactor core disposed in a reactor pressure vessel. A radiological containment contains the nuclear reactor and includes a concrete floor located underneath the nuclear reactor. An ex vessel corium retention system includes flow channels embedded in the concrete floor located underneath the nuclear reactor, an inlet in fluid communication with first ends of the flow channels, and an outlet in fluid communication with second ends of the flow channels. In some embodiments the inlet is in fluid communication with the interior of the radiological containment at a first elevation and the outlet is in fluidmore » communication with the interior of the radiological containment at a second elevation higher than the first elevation. The radiological containment may include a reactor cavity containing a lower portion of the pressure vessel, wherein the concrete floor located underneath the nuclear reactor is the reactor cavity floor.« less
The flight robotics laboratory
NASA Technical Reports Server (NTRS)
Tobbe, Patrick A.; Williamson, Marlin J.; Glaese, John R.
1988-01-01
The Flight Robotics Laboratory of the Marshall Space Flight Center is described in detail. This facility, containing an eight degree of freedom manipulator, precision air bearing floor, teleoperated motion base, reconfigurable operator's console, and VAX 11/750 computer system, provides simulation capability to study human/system interactions of remote systems. The facility hardware, software and subsequent integration of these components into a real time man-in-the-loop simulation for the evaluation of spacecraft contact proximity and dynamics are described.
20. RW Meyer Sugar Mill: 18761889. Boiling House Interior, 1878. ...
20. RW Meyer Sugar Mill: 1876-1889. Boiling House Interior, 1878. View: Remains of south wall. The molasses storage pits are below the floor in the foreground. The remaining piece of floor indicates the form of the entire floor. The sorghum pan and boiling range flue slope from left to right (east to west) and permitted batches of cane juice to flow through the boiling pan by gravity. The beams, joists, truss work are built of northwest pine. The sides and floor boards are built of redwood. The boiling range flue is built of fire-brick, masonry, and portland cement. The corrugated roof appears to be a later addition, not contemporary with mill operation. - R. W. Meyer Sugar Mill, State Route 47, Kualapuu, Maui County, HI
40. INTERIOR VIEW TO THE SOUTHEAST OF ROOM 302, A ...
40. INTERIOR VIEW TO THE SOUTHEAST OF ROOM 302, A SMALL ISOLATED OFFICE ON THE THIRD FLOOR ON THE EAST SIDE OF THE DISASSEMBLY BAY. A METAL SPIRAL STAIRCASE IS IN THE SOUTHEAST CORNER AND HATCHWAYS ARE IN THE CEILING AND FLOOR TOWARD THE EAST SIDE OF THE ROOM. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
11. VIEW OF INTERIOR OF BUILDING 220 FIRST FLOOR, CELL ...
11. VIEW OF INTERIOR OF BUILDING 220 FIRST FLOOR, CELL BLOCK 'A' (SOLITARY CONFINEMENT CELL BLOCK), TYPICAL SOLITARY CONFINEMENT CELL. THE CELL SHOWN IN CENTER OF PHOTO, HAS A 2-1/2' THICK STEEL DOOR. THE CELL SHOWN IN THE LEFT OF PHOTO, HAS A 3/4' DIAMETER IRON GRILLE DOOR. - U.S. Naval Base, Pearl Harbor, Brig, Neville Way near Ninth Street at Marine Barracks, Pearl City, Honolulu County, HI
Propeller aircraft interior noise model: User's manual for computer program
NASA Technical Reports Server (NTRS)
Wilby, E. G.; Pope, L. D.
1985-01-01
A computer program entitled PAIN (Propeller Aircraft Interior Noise) has been developed to permit calculation of the sound levels in the cabin of a propeller-driven airplane. The fuselage is modeled as a cylinder with a structurally integral floor, the cabin sidewall and floor being stiffened by ring frames, stringers and floor beams of arbitrary configurations. The cabin interior is covered with acoustic treatment and trim. The propeller noise consists of a series of tones at harmonics of the blade passage frequency. Input data required by the program include the mechanical and acoustical properties of the fuselage structure and sidewall trim. Also, the precise propeller noise signature must be defined on a grid that lies in the fuselage skin. The propeller data are generated with a propeller noise prediction program such as the NASA Langley ANOPP program. The program PAIN permits the calculation of the space-average interior sound levels for the first ten harmonics of a propeller rotating alongside the fuselage. User instructions for PAIN are given in the report. Development of the analytical model is presented in NASA CR 3813.
18. VIEW OF INTERIOR OF BUILDING 220 SECOND FLOOR, MIDDLE ...
18. VIEW OF INTERIOR OF BUILDING 220 SECOND FLOOR, MIDDLE OF MALE MEDIUM SECURITY SLEEPING AREA LOOKING UP AT THE CLERESTORY. THE WOOD TRUSS SYSTEM IS SHOWN IN UPPER RIGHT CORNER OF PHOTO, RETREATING INTO THE BACKGROUND OF THE PHOTO. THE WOOD STRUTS SHOWN IN THE UPPER LEFT OF PHOTO, TRANSVERSES ACROSS TOWARDS THE RIGHT OF PHOTO. - U.S. Naval Base, Pearl Harbor, Brig, Neville Way near Ninth Street at Marine Barracks, Pearl City, Honolulu County, HI
42. VIEW TO SOUTHEAST; MBE BUILDING, THIRD FLOOR, CONDUCTORS' LOCKER ...
42. VIEW TO SOUTHEAST; MBE BUILDING, THIRD FLOOR, CONDUCTORS' LOCKER ROOM INTERIOR (Dobson) - Los Angeles Union Passenger Terminal, Mail, Baggage, & Express Building, 800 North Alameda Street, Los Angeles, Los Angeles County, CA
43. VIEW TO NORTHEAST; MBE BUILDING, THIRD FLOOR, CONDUCTORS' LOCKER ...
43. VIEW TO NORTHEAST; MBE BUILDING, THIRD FLOOR, CONDUCTORS' LOCKER ROOM INTERIOR (Dobson) - Los Angeles Union Passenger Terminal, Mail, Baggage, & Express Building, 800 North Alameda Street, Los Angeles, Los Angeles County, CA
15. Interior, Machine Shop, Roundhouse Machine Shop Extension, Southern Pacific ...
15. Interior, Machine Shop, Roundhouse Machine Shop Extension, Southern Pacific Railroad Carlin Shops, view to northeast (90mm lens). The arched cutouts in the bottom chords of the roof trusses were necessary to provide clearance for the smokestacks of steam locomotives, and also mark the location of the former inspection pit in the floor (now filled in and covered by a new concrete floor). - Southern Pacific Railroad, Carlin Shops, Roundhouse Machine Shop Extension, Foot of Sixth Street, Carlin, Elko County, NV
10. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING SECOND ...
10. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING SECOND FLOOR CORRIDOR. VIEW TO NORTH. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
9. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING FIRST ...
9. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING FIRST FLOOR CORRIDOR. VIEW TO SOUTH. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
Propeller aircraft interior noise model
NASA Technical Reports Server (NTRS)
Pope, L. D.; Wilby, E. G.; Wilby, J. F.
1984-01-01
An analytical model was developed to predict the interior noise of propeller-driven aircraft. The fuselage model is that of a cylinder with a structurally-integral floor. The cabin sidewall is stiffened by stringers and ring frames, and the floor by longitudinal beams. The cabin interior is covered with a sidewall treatments consisting of layers of porous material and an impervious trim septum. Representation of the propeller pressure field is utilized as input data in the form of the propeller noise signature at a series of locations on a grid over the fuselage structure. Results obtained from the analytical model are compared with test data measured by NASA in a scale model cylindrical fuselage excited by a model propeller.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., but not limited to, certain window, floor, and stair surfaces. Impact surface means an interior or.... Interior window sill means the portion of the horizontal window ledge that protrudes into the interior of... based on the equation [60+(3*100)+(4*110)]/(1+3+4). Window trough means, for a typical double-hung...
4. INTERIOR OF ABANDONED SANTA ANA CANAL TUNNEL, SHOWING CEMENT ...
4. INTERIOR OF ABANDONED SANTA ANA CANAL TUNNEL, SHOWING CEMENT TROUGH FLOOR AND UNFINISHED GRANITE ROOF. VIEW TO SOUTHWEST. - Santa Ana River Hydroelectric System, Abandoned Tunnel, Redlands, San Bernardino County, CA
INTERIOR OF BUILDING 2, TYPICAL OFFICE (#212) WINDOW AND HEAT ...
INTERIOR OF BUILDING 2, TYPICAL OFFICE (#212) WINDOW AND HEAT REGISTER, SECOND FLOOR. FACING SOUTH - Roosevelt Base, Dispensary, Corner of Colorado Street & Richardson Avenue, Long Beach, Los Angeles County, CA
ERIC Educational Resources Information Center
Environ Planning Design, 1970
1970-01-01
Floor plans and photographs illustrate a description of the Samuel C. Williams Library at Stevens Institute of Technology, Hoboken, N.J. The unusual interior design allows students to take full advantage of the library's resources. (JW)
11. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW ON SECOND ...
11. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW ON SECOND FLOOR SHOWING TYPICAL OFFICE. VIEW TO NORTHWEST. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
1972-09-01
The Multiple Docking Adapter (MDA), designed and constructed under the direction of the Marshall Space Flight Center, was one of four principal sections comprising Skylab. The MDA provided the means by which the Command and Service Modules attached to the Skylab, enabling the crews to enter and work in it. Also included in the MDA was a control and display console for the Apollo Telescope Mount. This image shows an interior view of the MDA.
Exterior doorway detail south side of building (first floor) east ...
Exterior doorway detail south side of building (first floor) east inset porch; interior staircase visible in background - Fitzsimons General Hospital, Open Air Tuberculosis Ward, West Pennington Avenue & North Hickey Street Southwest Corner, Aurora, Adams County, CO
Interior of Mess Hall, showing original columns and quarry tile ...
Interior of Mess Hall, showing original columns and quarry tile floor - U.S. Naval Base, Pearl Harbor, Barracks & Mess Hall, Hornet Avenue between Liscome Bay & Enterprise Streets, Pearl City, Honolulu County, HI
60. INTERIOR VIEW OF LOCKKEEPER'S HOUSE I (REMOVED FROM ESPLANADE), ...
60. INTERIOR VIEW OF LOCKKEEPER'S HOUSE I (REMOVED FROM ESPLANADE), SHOWING FIRST FLOOR LIVING ROOM, LOOKING NORTHWEST - Upper Mississippi River 9-Foot Channel Project, Lock & Dam No. 3, Red Wing, Goodhue County, MN
61. INTERIOR VIEW OF LOCKKEEPER'S HOUSE I (REMOVED FROM ESPLANADE), ...
61. INTERIOR VIEW OF LOCKKEEPER'S HOUSE I (REMOVED FROM ESPLANADE), SHOWING FIRST FLOOR DINING ROOM, LOOKING NORTHWEST - Upper Mississippi River 9-Foot Channel Project, Lock & Dam No. 3, Red Wing, Goodhue County, MN
Interior view of coffee processing structure No. 1, showing concrete ...
Interior view of coffee processing structure No. 1, showing concrete reservoirs on floor, view towards the west - Finca Silem, Coffee Processing Structure No. 1, Highway 139, Kilometer 9.3, Maraguez, Ponce Municipio, PR
INTERIOR VIEW OF MACHINE, METAL AND ELECTRIC SHOPS FROM THE ...
INTERIOR VIEW OF MACHINE, METAL AND ELECTRIC SHOPS FROM THE ELECTRIC SHOP. RAILROAD TRACKS IN FLOOR. VIEW FROM THE WEST - Kekaha Sugar Company, Sugar Mill Building, 8315 Kekaha Road, Kekaha, Kauai County, HI
5. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL ROOM ON MAIN ...
5. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL ROOM ON MAIN FLOOR. LOOKING NORTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
Interior view, from ground floor up one of two mirrorimage ...
Interior view, from ground floor up one of two mirror-image stairways in buildings central pavilion. This one is located at the southwestern corner of the crossing of the main corridor and the central east-west passage, looking south. The staircase is composed of marble steps cantilevered out from the wall, each resting top of the stair below. The damage visible in this photograph stemmed from vandals pushing a piece of mechanical equipment off the second-story landing. - U. S. Naval Asylum, Biddle Hall, Gray's Ferry Avenue, Philadelphia, Philadelphia County, PA
36. INTERIOR VIEW LOOKING WEST FROM UNDERNEATH THE ORE BINS ...
36. INTERIOR VIEW LOOKING WEST FROM UNDERNEATH THE ORE BINS LOOKING AT THE BACK SIDE OF THE HENDY CHALLENGE CONTINUOUS ORE FEEDERS, #1 IS ON THE LEFT, #2 IS CENTER, AND #3 IS ON THE RIGHT. THESE ARE USED TO KEEP A CONTINUOUS FLOW OF ORE INTO THE STAMP MILLS. NOTE THE SPARE FEEDER DISKS ON THE FLOOR BOTTOM CENTER AND SPARE STAMP HEADS AND SHOES ON THE FLOOR BOTTOM LEFT OF THE IMAGE. - Standard Gold Mill, East of Bodie Creek, Northeast of Bodie, Bodie, Mono County, CA
13. Interior view of food storage area looking towards hallway; ...
13. Interior view of food storage area looking towards hallway; southeast corner of building on lower floor; view to north. - Ellsworth Air Force Base, Mess & Administration Building, 1561 Ellsworth Street, Blackhawk, Meade County, SD
13. Interior view, day tank in subfloor between two generator ...
13. Interior view, day tank in sub-floor between two generator bases, looking west - Naval Air Station Fallon, Power Plant, 800 Complex, off Carson Road near intersection of Pasture & Berney Roads, Fallon, Churchill County, NV
32. INTERIOR VIEW, MUSIC ROOM LOCATED AT THE NORTHEAST CORNER ...
32. INTERIOR VIEW, MUSIC ROOM LOCATED AT THE NORTHEAST CORNER OF THE HOUSE ON THE FIRST FLOOR, LOOKING TO THE FIREPLACE IN THE EAST WALL - Arlington Place, 331 Cotton Avenue, Southwest, Birmingham, Jefferson County, AL
INTERIOR VIEW OF BATHROOM 1. SHOWING ORIGINAL MOSAIC PATTERN TILE ...
INTERIOR VIEW OF BATHROOM 1. SHOWING ORIGINAL MOSAIC PATTERN TILE FLOOR, TILE WAINSCOT AND SHOWER SURROUND, AND CERAMIC ACCESSORIES. VIEW FACING EAST. - Hickam Field, Officers' Housing Type J, 701 Beard Street, Honolulu, Honolulu County, HI
Launch of Space Shuttle Atlantis / STS-129 Mission
2009-11-16
STS129-S-054 (16 Nov. 2009) --- Michael Coats (left), director of NASA's Johnson Space Center in Houston; and Bob Cabana, director of NASA's Kennedy Space Center in Florida, monitor the progress of Space Shuttle Atlantis' countdown from consoles in the Operations Management Room, a glass partitioned area overlooking the main floor of Firing Room 4, in Kennedy's Launch Control Center. Liftoff of Atlantis from Launch Pad 39A on its STS-129 mission to the International Space Station came at 2:28 p.m. (EST) on Nov. 16, 2009.
62. Neg. No. F75A, Jun 18, 1930, INTERIORWAREHOUSE, 1ST FLOOR, ...
62. Neg. No. F-75A, Jun 18, 1930, INTERIOR-WAREHOUSE, 1ST FLOOR, STORAGE OF AUTOMOBILE COMPONENTS - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA
Sarah A. Lewis; Andrew T. Hudak; Roger D. Ottmar; Peter R. Robichaud; Leigh B. Lentile; Sharon M. Hood; James B. Cronan; Penny Morgan
2011-01-01
Wildfire is a major forest disturbance in interior Alaska that can both directly and indirectly alter ecological processes. We used a combination of pre- and post-fire forest floor depths and post-fire ground cover assessments measured in the field, and high-resolution airborne hyperspectral imagery, to map forest floor conditions after the 2004 Taylor Complex in...
Deterioration of the Floor of Interior Courtyard of Sultan Hassan Mosque in Cairo, Egypt.
NASA Astrophysics Data System (ADS)
Nazel, Tarek
The college- mosque of Sultan Hassan is considered one of the finest examples of Islamic architecture not only in Egypt but also in the East. Its open interior courtyard is paved with three different types of marble slabs. These marble slabs suffer from severe deterioration. Causes of this deterioration were determined accurately through the ocular examination of the courtyard and confirmed by the laboratory tests which were carried out on samples representing the three common types of marble used in the floor namely the white, the red and the black marble. Sun light and heat are the main deterioration factors and the consequent thermal expansion is the main property which led to the detected deterioration phenomena. Types and mechanisms of deterioration affected the floor were described and explained.
Interior view, detail to show typical bracket with gold leaf ...
Interior view, detail to show typical bracket with gold leaf ornament, here the bracket is located the north of the speaker on the second floor - National Park Seminary, Ballroom, Linden Lane, Silver Spring, Montgomery County, MD
5. VIEW NORTHWEST SHOWING AQUEDUCT PRISM. NOTE INTERIOR STONE WORK ...
5. VIEW NORTHWEST SHOWING AQUEDUCT PRISM. NOTE INTERIOR STONE WORK OF THE PARAPET WALL AND REMAINS OF 1920 TIMBER AND CONCRETE FLOORING SYSTEM. - Chesapeake & Ohio Canal, Conococheague Creek Aqueduct, Milepost 99.80, Williamsport, Washington County, MD
7. Tower Building interior. First view of plant behind offices ...
7. Tower Building interior. First view of plant behind offices Equipment and double iron steps to 2nd floor. Beer parties were also held here. - Tivoli-Union Brewery, 1320-1348 Tenth Street, Denver, Denver County, CO
3. INTERIOR VIEW OF SMOKEHOUSE UNIT; NOTE STAINLESS STEEL NOZZLES ...
3. INTERIOR VIEW OF SMOKEHOUSE UNIT; NOTE STAINLESS STEEL NOZZLES THAT INTRODUCED SMOKE INTO UNIT; FLOOR IS UNPAINTED STEEL - Rath Packing Company, Smokehouse-Hog Chilling Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA
Interior view, groundfloor dining hall extending across the rotunda extension ...
Interior view, ground-floor dining hall extending across the rotunda extension from it's northern exterior wall to its southern exterior wall, from the north. - U. S. Naval Asylum, Biddle Hall, Gray's Ferry Avenue, Philadelphia, Philadelphia County, PA
38. SITE BUILDING 004 ELECTRIC POWER STATION AT INTERIOR ...
38. SITE BUILDING 004 - ELECTRIC POWER STATION AT INTERIOR - OBLIQUE VIEW AT FLOOR LEVEL SHOWING DIESEL ENGINE/GENERATOR SET NUMBER 5. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
64. INTERIOR VIEW OF THE CARBIDE COOLING SHED. VIEW IS ...
64. INTERIOR VIEW OF THE CARBIDE COOLING SHED. VIEW IS SHOWING CALCIUM CARBIDE IN COOLING CARS ON THE FLOOR. DECEMBER 26, 1918. - United States Nitrate Plant No. 2, Reservation Road, Muscle Shoals, Muscle Shoals, Colbert County, AL
Elevated lead contamination in boat-caulkers' homes in southern Thailand.
Thanapop, Chamnong; Geater, Alan F; Robson, Mark G; Phakthongsuk, Pitchaya
2009-01-01
Surface-wipe lead loading was measured at various locations in the homes of 31 boat-caulkers and 31 location-matched controls to identify factors associated with household lead contamination. Data were obtained by observation checklist and questionnaire. Lead loading was significantly higher in caulkers' than in control households. Median lead loadings (in microg/ft2) of various locations in caulkers' homes were windowsill, 43.9; exterior entrance, 9.5; interior entrance, 21.1; living room floor, 9.8; and bedroom floors 15.6. Corresponding levels in control homes were all less than 0.2 microg/ft2. Regression modeling indicated that lead loading was higher in caulkers' homes that were closer to a boat-yard, in which the caulker had a longer duration of boatyard work, and in which there were no children aged under 6 years resident. Exterior and interior entrance and living room floors had lower lead loading than windowsills. However, bedroom floors had significantly higher lead loading, similar to windowsills.
INTERIOR VIEW OF BATHROOM 1. NOTE THE ORIGINAL MOSAIC PATTERN ...
INTERIOR VIEW OF BATHROOM 1. NOTE THE ORIGINAL MOSAIC PATTERN FLOOR TILE, ASBESTOS CEMENT WALL BOARD, AND OPEN TRANSOM OVER THE SHOWER DOORWAY. VIEW FACING WEST. - Hickam Field, Officers' Housing Type D, 111 Beard Avenue, Honolulu, Honolulu County, HI
8. INTERIOR VIEW OF STATION PARLEY LOOKING THROUGH THE HATCH, ...
8. INTERIOR VIEW OF STATION PARLEY LOOKING THROUGH THE HATCH, SHOWING THE FLOOR AND THE INSTRUMENT PEDESTAL WITH HARDWARE. - White's Point Reservation, Base End Stations, B"6, Bounded by Voyager Circle & Mariner Drive, San Pedro, Los Angeles County, CA
11. Interior view of former mess hall; showing closed doorway ...
11. Interior view of former mess hall; showing closed doorway to former food storage; near northwest corner of building on main floor; view to east. - Ellsworth Air Force Base, Mess & Administration Building, 1561 Ellsworth Street, Blackhawk, Meade County, SD
4. INTERIOR VIEW OF CLUB HOUSE REFRIGERATION UNIT, SHOWING COOLING ...
4. INTERIOR VIEW OF CLUB HOUSE REFRIGERATION UNIT, SHOWING COOLING COILS AND CORK-LINED ROOM. CAMERA IS BETWEEN SEVEN AND EIGHT FEET ABOVE FLOOR LEVEL, FACING SOUTHEAST. - Swan Falls Village, Clubhouse 011, Snake River, Kuna, Ada County, ID
Interior detail of scrolled brackets on post, west side of ...
Interior detail of scrolled brackets on post, west side of first floor by rear entrance; camera facing north. - Mare Island Naval Shipyard, Hospital Headquarters, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo, Solano County, CA
INTERIOR VIEW OF BATHROOM 2. NOTE THE ORIGINAL MOSAIC PATTERN ...
INTERIOR VIEW OF BATHROOM 2. NOTE THE ORIGINAL MOSAIC PATTERN FLOOR TILE, EXPOSED-CORNER TUB, FLUSH VALVE TOILET, TILE WAINSCOT, AND CERAMIC ACCESSORIES. VIEW FACING NORTHEAST. - Hickam Field, Officers' Housing Type B, 704 Julian Avenue, Honolulu, Honolulu County, HI
INTERIOR VIEW OF THE LANAI AND FAMILY ROOM FROM THE ...
INTERIOR VIEW OF THE LANAI AND FAMILY ROOM FROM THE DINING ROOM. SHOWING THE TONGUE-AND-GROOVE WOOD FLOORING IN THE DINING ROOM. VIEW FACING NORTHEAST. - Hickam Field, Officers' Housing Type L, 702 Julian Avenue, Honolulu, Honolulu County, HI
Study of traffic noise levels at various heights of a 39-story building
Norman L. Meyerson
1977-01-01
Comparative measurements of exterior noise levels made at floors 3, 14, 26, and 37 of a high-rise apartment tower, when presented as a statistical distribution of percent exceedance vs. decibels, show the nature of the influence of local traffic at the low floors compared to the influence of an area source at the high floors. The open window penalty to interior noise...
A two-room model is developed to estimate the emission rate of di-2-ethylhexyl phthalate (DEHP) from vinyl flooring and the evolving gas-phase and adsorbed surface concentrations in a realistic indoor environment. Adsorption isotherms for phthalates and plasticizers on interior ...
29. SITE BUILDING 002 SCANNER BUILDING FLOOR 3A ...
29. SITE BUILDING 002 - SCANNER BUILDING - FLOOR 3A ("A" FACE) AT SYSTEM LAYOUT GRID 17. GENERAL OBLIQUE VIEW OF "A" FACE INTERIOR SHOWING RADAR EMITTER/ANTENNA INTERFACE ELECTRONICS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
7. VIEW OF INTERIOR OF BUILDING 220 FIRST FLOOR, DENTAL ...
7. VIEW OF INTERIOR OF BUILDING 220 FIRST FLOOR, DENTAL FACILITY AREA (ORIGINALLY THE ARSENAL ROOM). THE ORIGINAL DOOR, SHOWN ON THE LEFT OF PHOTO, IS CONSTRUCTED OF 2' THICK HARDWOOD SANDWICHED BY 1/4' THICK STEEL PLATES WHICH ARE BOLTED TOGETHER. THE DOOR SHOWN ON THE RIGHT OF PHOTO, WAS ADDED DURING THE RENOVATION INTO A DENTAL FACILITY. THE TEXTURED WALLS DISPLAY THE IMPRESSION OF THE WOOD FORMS (5' WIDE PLANKS) USED TO CAST THE 12' THICK CONCRETE WALLS. - U.S. Naval Base, Pearl Harbor, Brig, Neville Way near Ninth Street at Marine Barracks, Pearl City, Honolulu County, HI
South Fork Telephone Switchboard Building, interior west room showing hardwood ...
South Fork Telephone Switchboard Building, interior west room showing hardwood floor; view south - Fort McKinley, South Fork Telephone Switchboard Building, South side of Weymouth Way, approximately 100 feet west of East Side Drive, Great Diamond Island, Portland, Cumberland County, ME
43 CFR 3436.1 - Coal lease exchanges.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Coal lease exchanges. 3436.1 Section 3436..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) NONCOMPETITIVE LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.1 Coal lease exchanges. ...
43 CFR 3436.1 - Coal lease exchanges.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Coal lease exchanges. 3436.1 Section 3436..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) NONCOMPETITIVE LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.1 Coal lease exchanges. ...
43 CFR 3436.1 - Coal lease exchanges.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Coal lease exchanges. 3436.1 Section 3436..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) NONCOMPETITIVE LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.1 Coal lease exchanges. ...
43 CFR 3436.2 - Fee coal exchanges.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Fee coal exchanges. 3436.2 Section 3436.2..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) NONCOMPETITIVE LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.2 Fee coal exchanges. ...
43 CFR 3436.2 - Fee coal exchanges.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Fee coal exchanges. 3436.2 Section 3436.2..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) NONCOMPETITIVE LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.2 Fee coal exchanges. ...
43 CFR 3436.1 - Coal lease exchanges.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Coal lease exchanges. 3436.1 Section 3436..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) NONCOMPETITIVE LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.1 Coal lease exchanges. ...
43 CFR 3436.2 - Fee coal exchanges.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Fee coal exchanges. 3436.2 Section 3436.2..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) NONCOMPETITIVE LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.2 Fee coal exchanges. ...
43 CFR 3436.2 - Fee coal exchanges.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Fee coal exchanges. 3436.2 Section 3436.2..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) NONCOMPETITIVE LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.2 Fee coal exchanges. ...
Interior oblique view of bathroom (converted to handicap) at ground ...
Interior oblique view of bathroom (converted to handicap) at ground floor of building 11, from hall doorway, looking northeast - North Beach Place, 531 Bay Street, 650 Francisco Street, 531 Bay Street, 650 Francisco Street, San Francisco, San Francisco County, CA
7. INTERIOR OF SECONDFLOOR MAIN SECTION OF BUILDING 321. VIEW ...
7. INTERIOR OF SECOND-FLOOR MAIN SECTION OF BUILDING 321. VIEW TO WEST. - Rocky Mountain Arsenal, Boiler Plant-Central Gas Heat Plant, 1022 feet South of December Seventh Avenue; 525 feet West of D Street, Commerce City, Adams County, CO
4. INTERIOR OF FIRSTFLOOR WEST SECTION OF BUILDING 321. VIEW ...
4. INTERIOR OF FIRST-FLOOR WEST SECTION OF BUILDING 321. VIEW TO NORTH. - Rocky Mountain Arsenal, Boiler Plant-Central Gas Heat Plant, 1022 feet South of December Seventh Avenue; 525 feet West of D Street, Commerce City, Adams County, CO
6. INTERIOR OF THIRDFLOOR MAIN SECTION OF BUILDING 321. VIEW ...
6. INTERIOR OF THIRD-FLOOR MAIN SECTION OF BUILDING 321. VIEW TO WEST. - Rocky Mountain Arsenal, Boiler Plant-Central Gas Heat Plant, 1022 feet South of December Seventh Avenue; 525 feet West of D Street, Commerce City, Adams County, CO
Package Up Your Troubles--An Introduction to Package Libraries
ERIC Educational Resources Information Center
Frank, Colin
1978-01-01
Discusses a "package deal" library--a prefabricated building including interior furnishing--in terms of costs, fitness for purpose, and interior design, i.e., shelving, flooring, heating, lighting, and humidity. Advantages and disadvantages of the package library are also considered. (Author/MBR)
2. Historic American Buildings Survey, Nelson E. Baldwin, Photographer, Jan. ...
2. Historic American Buildings Survey, Nelson E. Baldwin, Photographer, Jan. 16, 1937, View - Interior Door Opening into Apartment on First Floor, 123 North Pearl St., Albany, N.Y. - Old Homeopathic Hospital (Interiors), 123 North Pearl Street, Albany, Albany County, NY
Interior building details of Building A, dungeon cell adjacent to ...
Interior building details of Building A, dungeon cell adjacent to northwest cell: granite and brick threshold, poured concrete floors, plastered finished walls, vaulted veiling; northwesterly view - San Quentin State Prison, Building 22, Point San Quentin, San Quentin, Marin County, CA
Materials for School Construction.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
As an assist to the superintendent and members of his staff, this booklet has been prepared for obtaining information in the field of building, planning and construction. Topics discussed are--(1) structure, (2) roofs, (3) floor construction, (4) floor finishes, (5) ceilings, (6) exterior wall construction, (7) interior walls and partitions, (8)…
17. INTERIOR VIEW TO THE EAST OF ROOM 215, A ...
17. INTERIOR VIEW TO THE EAST OF ROOM 215, A SECOND FLOOR OFFICE ABOVE ROOM 137 IN THE COLD ASSEMBLY AREA. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
39. INTERIOR VIEW TO THE NORTH OF A WORK STATION ...
39. INTERIOR VIEW TO THE NORTH OF A WORK STATION WITH MANIPULATOR ARMS IN THE SOUTH CORRIDOR OF THE SECOND FLOOR. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
View of skylight from mezzanine of American Railway Express Building ...
View of skylight from mezzanine of American Railway Express Building to interior light well on second floor. Skylight lights interior hallway leading to mezzanine rooms - Southern Pacific Railroad Depot, Railroad Terminal Post Office & Express Building, Fifth & I Streets, Sacramento, Sacramento County, CA
6. Interior view of main entrance vestibule looking towards lobby; ...
6. Interior view of main entrance vestibule looking towards lobby; showing wall mounted information stations and drinking fountain; near southeast corner of building on main floor; view to north. - Ellsworth Air Force Base, Mess & Administration Building, 1561 Ellsworth Street, Blackhawk, Meade County, SD
Interior oblique view of revised handicap accessible bathroom in 1st ...
Interior oblique view of revised handicap accessible bathroom in 1st floor of Building 6 from hall doorway, looking southwest - North Beach Place, 401 Bay Street, 500 Francisco Street, 401 Bay Street, 500 Francisco Street, San Francisco, San Francisco County, CA
5. INTERIOR OF SECONDAND THIRDFLOOR MAIN SECTION OF BUILDING 321. ...
5. INTERIOR OF SECOND-AND THIRD-FLOOR MAIN SECTION OF BUILDING 321. VIEW TO WEST. - Rocky Mountain Arsenal, Boiler Plant-Central Gas Heat Plant, 1022 feet South of December Seventh Avenue; 525 feet West of D Street, Commerce City, Adams County, CO
22. INTERIOR VIEW, BASEMENT UNDER NORTH ROOM OF MAIN BLOCK, ...
22. INTERIOR VIEW, BASEMENT UNDER NORTH ROOM OF MAIN BLOCK, VIEW OF NORTHWEST WALL SHOWING CORBELING BASE OF FIRST FLOOR CHIMNEY BLOCK WITH STOVE-PIPE HOLE, AND MORTISE AND TENON FRAMING FOR HEARTH BED - Clifton Farm, Off Baker Road, Frederick, Frederick County, MD
Building No. 392, interior overview with welding stalls and steel ...
Building No. 392, interior overview with welding stalls and steel plate floor, view facing west-southwest - U.S. Naval Base, Pearl Harbor, Marine Railway No. 1 Accessories House & Apprentice Welding School, Additions, Intersection of Avenue B & Sixth Street, Pearl City, Honolulu County, HI
46. INTERIOR VIEW, MUSIC ROOM LOCATED AT THE NORTHEAST CORNER ...
46. INTERIOR VIEW, MUSIC ROOM LOCATED AT THE NORTHEAST CORNER OF THE HOUSE ON THE FIRST FLOOR, LOOKING TO THE FIREPLACE IN THE EAST WALL (DUPLICATE OF HABS No. AL-424-32) - Arlington Place, 331 Cotton Avenue, Southwest, Birmingham, Jefferson County, AL
Interior views shows farmhouse kitchen with door leading to outside ...
Interior views shows farmhouse kitchen with door leading to outside on right. Dark line on floor marks kitchen addition, seen from outside in photo WA-211-C-1 - Kosai Farm, Farmhouse, B Street north of Northwest Twenty-ninth Street, Auburn, King County, WA
47. INTERIOR VIEW, DINING ROOM LOCATED AT THE SOUTHEAST CORNER ...
47. INTERIOR VIEW, DINING ROOM LOCATED AT THE SOUTHEAST CORNER OF THE HOUSE ON THE FIRST FLOOR, LOOKING TO THE FIREPLACE IN THE EAST WALL (DUPLICATE OF HABS No. AL-424-33) - Arlington Place, 331 Cotton Avenue, Southwest, Birmingham, Jefferson County, AL
Validation of an interior noise prediction model for a composite cylinder
NASA Technical Reports Server (NTRS)
Beyer, Todd B.; Grosveld, Ferdinand W.
1987-01-01
An acoustic modal analysis has been performed in the cavity of a composite cylinder model of an aircraft fuselage. The filament wound, composite shell is 12 feet long and 5.5 feet in diameter. A one-half-in. thick plywood floor is attached to the shell 69 deg from the vertical centerline through the bottom of the shell. The acoustic modal frequencies were obtained from a sound pressure level and phase survey conducted throughout the interior volume bounded by the floor, endcaps and stiffened shell, while being excited by white noise from a loudspeaker source. The measured acoustic resonance frequencies and mode shapes compare well with analytical predictions from the Propeller Aircraft Interior Noise (PAIN) model. Details of the theory and derivation of the acoustic characteristics have been included. Reverberation time measurements, using the integrated impulse technique, have been performed to determine acoustic loss factors. These measured loss factors have been input to the PAIN program in order to more accurately predict the space-averaged interior noise of the composite cylinder.
D'Souza, Clive; Paquet, Victor; Lenker, James A; Steinfeld, Edward
2017-07-01
The emergence of low-floor bus designs and related regulatory standards in the U.S. have resulted in substantial improvements in public transit accessibility. However, passengers using wheeled mobility devices still experience safety concerns and inefficiencies in boarding, disembarking, and interior circulation on low-floor buses. This study investigates effects of low-floor bus interior configuration and passenger crowding on boarding and disembarking efficiency and safety. Users of manual wheelchairs (n = 18), powered wheelchairs (n = 21) and electric scooters (n = 9) simulated boarding and disembarking in three interior layout configurations at low and high passenger crowding conditions on a full-scale laboratory mock-up of a low-floor bus. Dependent measures comprised task times and critical incidents during access ramp use, fare payment, and movement to and from the doorway and wheeled mobility securement area. Individual times for unassisted boarding ranged from 15.2 to 245.3 s and for disembarking ranged from 9.1 to 164.6 s across layout and passenger crowding conditions. Nonparametric analysis of variance showed significant differences and interactions across vehicle design conditions, passenger load and mobility device type on user performance. The configuration having electronic on-board fare payment, rear-bus entrance doorways and adjacent device securement areas demonstrated greatest efficiency and safety. High passenger load adversely impacted efficiency and frequency of critical incidents during on-board circulation across all three layouts. Findings have broader implications for improving transit system efficiency and quality of service across the spectrum of transit users. Copyright © 2017 Elsevier Ltd. All rights reserved.
A case of homicidal intoxication by chloropicrin.
Gonmori, K; Muto, H; Yamamoto, T; Takahashi, K
1987-06-01
An 18-year-old girl and her boyfriend were sprayed with toxic chemicals from the left front door of their parked car. The girl died of intoxication about 4 h later. The main findings of postmortem examination were spotty discolorations on her skin and severe pulmonary edema. The unknown chemical was identified as chloropicrin by gas-liquid chromatography and gas chromatography-mass spectrometry of her lung and on samples from the car's console box, cassette tape case, and floor mat, all of which were wet with chemicals. The content of chloropicrin in her lung was calculated at 1.6 ng/g of wet weight.
6. Interior view of room at south end of building ...
6. Interior view of room at south end of building shows skylight, sheet metal ceiling, work benches and wood brick floor. Camera is pointed NE. In 1994 this room was intact. - Pacific Creosoting Plant, Machine Shop, 5350 Creosote Place, Northeast, Bremerton, Kitsap County, WA
Interior oblique view of laundry room (converted from original offices) ...
Interior oblique view of laundry room (converted from original offices) in ground floor of Building 11, from southeast corner of room, looking northwest - North Beach Place, 531 Bay Street, 650 Francisco Street, 531 Bay Street, 650 Francisco Street, San Francisco, San Francisco County, CA
REACTOR SERVICE BUILDING, TRA635, INTERIOR. CAMERA FACES NORTHWEST TOWARDS INTERIOR ...
REACTOR SERVICE BUILDING, TRA-635, INTERIOR. CAMERA FACES NORTHWEST TOWARDS INTERIOR WALL ENCLOSING STORAGE AND OFFICE SPACE ALONG THE WEST SIDE. AT RIGHT EDGE IS DOOR TO MTR BUILDING. FROM RIGHT TO LEFT, SPACE WAS PLANNED FOR A LOCKER ROOM, MTR ISSUE ROOM, AND STORAGE AREAS AND RELATED OFFICES. NOTE SECOND "MEZZANINE" FLOOR ABOVE. INL NEGATIVE NO. 10227. Unknown Photographer, 3/23/1954 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
INTERIOR VIEW OF TANK CHARGING ROOM ON LEVEL 4; NOTE ...
INTERIOR VIEW OF TANK CHARGING ROOM ON LEVEL 4; NOTE HERRINGBONE-PATTERNED BRICK FLOOR; TIMBER SUBSTRUCTURE CARRIED CRANE USED TO REMOVE HEAVY TANK COVERS; WINDOWS IN ROOFTOP MONITOR PROVIDED AMPLE NATURAL LIGHT - Rath Packing Company, Inedible Tank House, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA
12. Interior view of reception and secretarial space for legal ...
12. Interior view of reception and secretarial space for legal offices; showing wall mounted shelving and exterior window; center and south side of main section of building on top floor; view to southwest. - Ellsworth Air Force Base, Group Administration & Secure Storage Building, 2372 Westover Avenue, Blackhawk, Meade County, SD
8. Interior view of former food service and storage area ...
8. Interior view of former food service and storage area looking towards hall way; showing closed and open doorways to walk-in storage; near southwest corner of building on main floor; view to southwest. - Ellsworth Air Force Base, Mess & Administration Building, 1561 Ellsworth Street, Blackhawk, Meade County, SD
The Importance of Interior Design Elements as They Relate to Student Outcomes.
ERIC Educational Resources Information Center
Tanner, C. Kenneth; Langford, Ann
This study investigated the following questions: (1) "What are the perceptions that elementary school principals have concerning the influence of interior design elements such as floor and wall coverings, lighting, flexibility, acoustics, color, texture, patterns, cleanliness, and maintenance on student achievement, teacher retention, and student…
Interior view, firstfloor room connecting with the rotunda through the ...
Interior view, first-floor room connecting with the rotunda through the door at the center of its south wall and extending through to the south exterior wall of the rotunda extension, from the north. - U. S. Naval Asylum, Biddle Hall, Gray's Ferry Avenue, Philadelphia, Philadelphia County, PA
Interior view, firstfloor room extending between the north wall of ...
Interior view, first-floor room extending between the north wall of the rotunda and the rotunda extensions north exterior wall, looking southwest. The small doorway at center opens onto the vestibule letting onto the rotunda. - U. S. Naval Asylum, Biddle Hall, Gray's Ferry Avenue, Philadelphia, Philadelphia County, PA
FACILITY 89. INTERIOR OF SECONDFLOOR HALLWAY, AS SEEN FROM MASTER ...
FACILITY 89. INTERIOR OF SECOND-FLOOR HALLWAY, AS SEEN FROM MASTER BEDROOM. CLOSET OVER STAIRWAY AT LEFT. VIEW FACING SOUTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI
23. INTERIOR OF TAN 629 HANGAR, TAKEN FROM LOW ROOF, ...
23. INTERIOR OF TAN 629 HANGAR, TAKEN FROM LOW ROOF, FACING NORTHEAST. SHOWS GROUND LEVEL USE OF FLOOR SPACE FOR TEMPORARY STORAGE OF CRATES. MOISTURE ON SURFACE IS FROM LEAKY HANGAR ROOF. - Idaho National Engineering Laboratory, Test Area North, Hangar No. 629, Scoville, Butte County, ID
65. ARAII. Interior view of SL1 reactor building control piping ...
65. ARA-II. Interior view of SL-1 reactor building control piping for water purification system. On operating floor of building. March 21, 1958. Ineel photo no. 58-1360. Photographer: Jack L. Anderson. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
Interior view, secondstory passage extending westward from main corridor to ...
Interior view, second-story passage extending westward from main corridor to rooms on the north side of the rotunda in the rotunda extension. The roof and third-floor in this area is completely missing. - U. S. Naval Asylum, Biddle Hall, Gray's Ferry Avenue, Philadelphia, Philadelphia County, PA
23. Interior view of entrance corridor looking towards main stairway; ...
23. Interior view of entrance corridor looking towards main stairway; showing unoccupied corner office space and encased bulletin boards; center of main section of building on main floor; view to northeast. - Ellsworth Air Force Base, Group Administration & Secure Storage Building, 2372 Westover Avenue, Blackhawk, Meade County, SD
INTERIOR VIEW, WINDOW BOW IN EAST WALL OF SERVANTS HALL. ...
INTERIOR VIEW, WINDOW BOW IN EAST WALL OF SERVANTS HALL. THE STEEL BEAMS (COLORED WHITE) EXTENDING ACROSS THE SPACE UNDER THE JOISTS WERE PART OF A RECENT INTERVENTION TO COUNTERACT DEFLECTION IN THE FLOORS OF THE PRINCIPAL STORY - The Woodlands, 4000 Woodlands Avenue, Philadelphia, Philadelphia County, PA
Interior building details of Building C, Room C003 and Room ...
Interior building details of Building C, Room C-003 and Room C-002 catwalk above false ceiling, east brick retaining wall, brick north wall, 1930 retrofit pillars, wood floor joints; northeasterly view - San Quentin State Prison, Building 22, Point San Quentin, San Quentin, Marin County, CA
33. INTERIOR VIEW, DINING ROOM LOCATED AT THE SOUTHEAST CORNER ...
33. INTERIOR VIEW, DINING ROOM LOCATED AT THE SOUTHEAST CORNER OF THE HOUSE ON THE FIRST FLOOR, LOOKING TO THE FIREPLACE IN THE EAST WALL (NOTE DOORWAY TO THE MUSIC ROOM ON THE LEFT (NORTH) SIDE OF THE PHOTOGRAPH) - Arlington Place, 331 Cotton Avenue, Southwest, Birmingham, Jefferson County, AL
12. INTERIOR DIABLO POWERHOUSE AS SEEN FROM NORTHEAST CORNER OF ...
12. INTERIOR DIABLO POWERHOUSE AS SEEN FROM NORTHEAST CORNER OF GENERATOR FLOOR LOOKING AT UNIT 31. CONTROL CABINETS FOR ASEA GOVERNOR SYSTEM ARE IN FRONT OF GENERATOR, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA
Low-floor bus design preferences of walking aid users during simulated boarding and alighting.
D'souza, Clive; Paquet, Victor; Lenker, James; Steinfeld, Edward; Bareria, Piyush
2012-01-01
Low-floor buses represent a significant improvement in accessible public transit for passengers with limited mobility. However, there is still a need for research on the inclusive design of transit buses to identify specific low-floor bus design conditions that are either particularly accommodating or challenging for passengers with functional and mobility impairments. These include doorway locations, seating configuration and the large front wheel-well covers that collectively impact boarding, alighting and interior movement of passengers. Findings from a laboratory study using a static full-scale simulation of a lowfloor bus to evaluate the impact of seating configuration and crowding on interior movement and accessibility for individuals with and without walking aids are presented (n=41). Simulated bus journeys that included boarding, fare payment, seating, and alighting were performed. Results from video observations and subjective assessments showed differences in boarding and alighting performance and users' perceptions of task difficulty. The need for assistive design features (e.g. handholds, stanchions), legroom and stowage space for walking aids was evident. These results demonstrate that specific design conditions in low-floor buses can significantly impact design preference among those who use walking aids. Consideration of ergonomics and inclusive design can therefore be used to improve the design of low-floor buses.
A corridor on the first floor of the building, looking ...
A corridor on the first floor of the building, looking west, shows some of the typical interior finishes in this section. At the end of the hallway, the corridor turns right after entering the next adjacent structure - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH
ERIC Educational Resources Information Center
Arnsan, Dan
1985-01-01
Describes how staff at Palomar College Library participated in planning the interior of the library building in areas such as designing the floor plans, writing furniture specifications, choosing colors, and making structural changes in the facility. Offers advice for other librarians participating in building projects. (DMM)
33. INTERIOR VIEW TO THE SOUTHWEST OF ROOM 135, A ...
33. INTERIOR VIEW TO THE SOUTHWEST OF ROOM 135, A FIRST FLOOR CORRIDOR AND VIEWING GALLERY NEXT TO THE POST-MORTEM CELLS. VIEWING AND WORK STATIONS ARE ON THE WEST WALL. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
18. Interior view of large unoccupied meeting/gathering room looking towards ...
18. Interior view of large unoccupied meeting/gathering room looking towards small stage and opened doorway to exterior vestibule; showing through wall air conditioning unit; north end of east wing on main floor; view to southwest. - Ellsworth Air Force Base, Group Administration & Secure Storage Building, 2372 Westover Avenue, Blackhawk, Meade County, SD
Interior building details of Building D, Room DM5: mezzanine hallway, ...
Interior building details of Building D, Room D-M5: mezzanine hallway, intact historic asphalt surface flooring, full height partition wall with hoppers and east brick retaining wall with voids from the original veiling joist; southerly view - San Quentin State Prison, Building 22, Point San Quentin, San Quentin, Marin County, CA
PBF (PER620) interior. Detail view of door in north wall ...
PBF (PER-620) interior. Detail view of door in north wall of reactor bay. Camera facing north. Note tonnage weighting of hatch covers in floor. Date: May 2004. INEEL negative no. HD-41-8-2 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
PBF (PER620) interior. Detail view of actuator platform and control ...
PBF (PER-620) interior. Detail view of actuator platform and control rod mechanism. Camera facing easterly from floor level. Reactor pool at lower left of view. Date: March 2004. INEEL negative no. HD-41-3-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
37. Interior view of the south end of the east ...
37. Interior view of the south end of the east wall looking at the section between the door and the southeastern corner of the building, with scale (note hole in floor from wildlife appropriating Kiskiack as their home) - Kiskiack, Naval Mine Depot, State Route 238 vicinity, Yorktown, York County, VA
19. Interior first level view looking north within forward (north) ...
19. Interior first level view looking north within forward (north) section of firing pier. Objects pictured include torpedo cart (left), floor-mounted roller tray (extending to lower right), and (at center rear), deck-type firing tube. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
7. TYPICAL INTERIOR AND BOTTOM OF EMPTY 14.5FOOTDIAMETER RIVETED STEEL ...
7. TYPICAL INTERIOR AND BOTTOM OF EMPTY 14.5-FOOT-DIAMETER RIVETED STEEL SOAP KETTLE, WITH STEAM COILS; VIEW DOWN FROM KETTLE TOP, FIFTH FLOOR, EAST BAY, THIRD KETTLE FROM SOUTH - Colgate & Company Jersey City Plant, Building No. B-13, 48-50 Grand Street, Jersey City, Hudson County, NJ
31. Interior view, north end of the west wall looking ...
31. Interior view, north end of the west wall looking at the section between the front door and the northwestern corner of the building, with scale (note position of post fire partition wall and floor joists as recorded in the brickwork) - Kiskiack, Naval Mine Depot, State Route 238 vicinity, Yorktown, York County, VA
2012-08-27
CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, firing room 3 of the Launch Control Center is undergoing a major reconstruction. Space shuttle era consoles have been removed as well as flooring and cables that had been in place dating back to the Apollo program. For more than 40 years, the firing rooms of the Launch Control Center have served as the “brain” for launches at NASA’s Florida Spaceport. Whether an Apollo-Saturn rocket or the space shuttle, the focus was always on one program. Now the firing rooms are also being modified to be more generic in nature supporting a variety of future launch vehicles. Photo credit: NASA/Kim Shiflett
2012-08-27
CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, firing room 3 of the Launch Control Center is undergoing a major reconstruction. Space shuttle era consoles have been removed as well as flooring and cables that had been in place dating back to the Apollo program. For more than 40 years, the firing rooms of the Launch Control Center have served as the “brain” for launches at NASA’s Florida Spaceport. Whether an Apollo-Saturn rocket or the space shuttle, the focus was always on one program. Now the firing rooms are also being modified to be more generic in nature supporting a variety of future launch vehicles. Photo credit: NASA/Kim Shiflett
2012-08-27
CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, firing room 3 of the Launch Control Center is undergoing a major reconstruction. Space shuttle era consoles have been removed as well as flooring and cables that had been in place dating back to the Apollo program. For more than 40 years, the firing rooms of the Launch Control Center have served as the “brain” for launches at NASA’s Florida Spaceport. Whether an Apollo-Saturn rocket or the space shuttle, the focus was always on one program. Now the firing rooms are also being modified to be more generic in nature supporting a variety of future launch vehicles. Photo credit: NASA/Kim Shiflett
2012-08-27
CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, firing room 3 of the Launch Control Center is undergoing a major reconstruction. Space shuttle era consoles have been removed as well as flooring and cables that had been in place dating back to the Apollo program. For more than 40 years, the firing rooms of the Launch Control Center have served as the “brain” for launches at NASA’s Florida Spaceport. Whether an Apollo-Saturn rocket or the space shuttle, the focus was always on one program. Now the firing rooms are also being modified to be more generic in nature supporting a variety of future launch vehicles. Photo credit: NASA/Kim Shiflett
2012-08-27
CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, firing room 3 of the Launch Control Center is undergoing a major reconstruction. Space shuttle era consoles have been removed as well as flooring and cables that had been in place dating back to the Apollo program. For more than 40 years, the firing rooms of the Launch Control Center have served as the “brain” for launches at NASA’s Florida Spaceport. Whether an Apollo-Saturn rocket or the space shuttle, the focus was always on one program. Now the firing rooms are also being modified to be more generic in nature supporting a variety of future launch vehicles. Photo credit: NASA/Kim Shiflett
Maintenance Resources by Building Use for Installations in Germany
1991-11-01
125125. .01 0531140 STEEL ( INSULATED ) PAINTED INTERIOR DOOR 124956. .01 0432710 DOUBLE PANE STEEL FIXED WNDW. 1ST FLOOR 124922. .01 1131200 QUARTZ...FINISH 8507. .00 0535400 ALUMINUM DOUBLE ROLL-UP INTERIOR DOOR 8490. .00 0424310 ALUMINUM LOUVERED EXT DOORS 7973. .00 0421340 STEEL ( INSUL CORE) UNPUT...H.P. 0831130 20 1.09 Clay Block (Painted) Interior 0612200 21 1.08 Wall Sink. Stainless Steel 0811F00 22 1.03 Steel (Painted) Exterior Door 0421210 23
35. INTERIOR VIEW TO THE NORTHWEST OF ROOM 152, A ...
35. INTERIOR VIEW TO THE NORTHWEST OF ROOM 152, A FIRST FLOOR CORRIDOR AND VIEWING GALLERY ON THE WEST SIDE OF THE POST-MORTEM CELLS. VIEWING AND WORK STATIONS ARE IN THE EAST WALL. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
Interior view, groundfloor room in southeast corner looking south. Masonry ...
Interior view, ground-floor room in southeast corner looking south. Masonry groin and barrel vaulting was used throughout the building in attempt to fireproof the structure, a major advancement in the design of institutional structures during the second quarter of the nineteenth century. - U. S. Naval Asylum, Biddle Hall, Gray's Ferry Avenue, Philadelphia, Philadelphia County, PA
43 CFR 3436.2-2 - Federal coal deposits subject to disposal by exchange.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Federal coal deposits subject to disposal by exchange. 3436.2-2 Section 3436.2-2 Public Lands: Interior Regulations Relating to Public Lands... LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.2-2 Federal coal deposits...
43 CFR 3436.2-2 - Federal coal deposits subject to disposal by exchange.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Federal coal deposits subject to disposal by exchange. 3436.2-2 Section 3436.2-2 Public Lands: Interior Regulations Relating to Public Lands... LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.2-2 Federal coal deposits...
Photographic copy of construction drawing, U.S. Department of the Interior, ...
Photographic copy of construction drawing, U.S. Department of the Interior, Office of Indian Affairs, Supervising Construction Engineer, Albuquerque, New Mexico, 7 August 1936 (original print located at Albuquerque Area Office, Bureau of Indian Affairs, Albuquerque, New Mexico). Second floor plan. - Southern Ute Boarding School, Boy's Dormitory, Ouray & Capote Drives, Ignacio, La Plata County, CO
30. SITE BUILDING 002 SCANNER BUILDING FLOOR 3A ...
30. SITE BUILDING 002 - SCANNER BUILDING - FLOOR 3A ("A" FACE) INTERIOR BETWEEN GRIDS 17-A1 AND 18-A1, SHOWING REAR OF RADAR EMITTER ELECTRONIC INTERFACE TERMINAL NO. 3147-20, "RECEIVER TRANSMITTER RADAR" MODULE. VIEW IS ALSO SHOWING BUILDING FIRE STOP MATERIAL AT BOTTOM OF FLOOR. NOTE: WALL SLOPES BOTTOM TO TOP INWARD; STRUCTURAL ELEMENT IN FOREGROUND. VIEW ALSO SHOWS PIPING GRID OF CHILLED WATER LINES FOR ELECTRONIC SYSTEMS COOLING. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
Floor-fractured craters on Ceres and implications for interior processes
NASA Astrophysics Data System (ADS)
Buczkowski, Debra; Schenk, Paul M.; Scully, Jennifer E. C.; Park, Ryan; Preusker, Frank; Raymond, Carol; Russell, Christopher T.
2016-10-01
Several of the impact craters on Ceres have patterns of fractures on their floors. These fractures appear similar to those found within a class of lunar craters referred to as Floor-Fractured Craters (FFCs) [Schultz, 1976].Lunar FFCs are characterized by anomalously shallow floors cut by radial, concentric, and/or polygonal fractures, and have been classified into crater classes, Types 1 through 6, based on their morphometric properties [Schultz, 1976; Jozwiak et al, 2012, 2015]. Models for their formation have included both floor uplift due to magmatic intrusion below the crater or floor shallowing due to viscous relaxation. However, the observation that the depth versus diameter (d/D) relationship of the FFCs is distinctly shallower than the same association for other lunar craters supports the hypotheses that the floor fractures form due to shallow magmatic intrusion under the crater [Jozwiak et al, 2012, 2015].FFCs have also been identified on Mars [Bamberg et al., 2014]. Martian FFCs exhibit morphological characteristics similar to the lunar FFCs, and analyses suggest that the Martian FCCs also formed due to volcanic activity, although heavily influenced by interactions with groundwater and/or ice.We have cataloged the Ceres FFCs according to the classification scheme designed for the Moon. Large (>50 km) Ceres FFCs are most consistent with Type 1 lunar FFCs, having deep floors, central peaks, wall terraces, and radial and/or concentric fractures. Smaller craters on Ceres are more consistent with Type 4 lunar FFCs, having less-pronounced floor fractures and a v-shaped moats separating the wall scarp from the crater interior.An analysis of the d/D ratio for Ceres craters shows that, like lunar FFCs, the Ceres FFCs are anomalously shallow. This suggests that the fractures on the floor of Ceres FFCs may be due the intrusion of a low-density material below the craters that is uplifting their floors. While on the Moon and Mars the intrusive material is hypothesized to be silicate magma, this is unlikely for Ceres. However, a cryovolcanic extrusive edifice has been identified on Ceres [Ruesch et al., 2016], suggesting that cryomagmatic intrusions could be responsible for the formation of the Ceres FFCs.
34. INTERIOR VIEW TO THE NORTH OF ROOMS 143 AND ...
34. INTERIOR VIEW TO THE NORTH OF ROOMS 143 AND 150, A FIRST FLOOR CORRIDOR AND VIEWING GALLERY ON THE EAST SIDE OF THE POST-MORTEM CELLS. VIEWING AND WORK STATIONS ARE IN THE NORTH AND WEST WALLS. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
17. Interior view of courtroom looking towards judge's bench; showing ...
17. Interior view of courtroom looking towards judge's bench; showing built in linear seating on both ends of room, clerical desk and equipment, through wall air conditioning units, exterior windows and door; north end of west wing on top floor; view to northwest. - Ellsworth Air Force Base, Group Administration & Secure Storage Building, 2372 Westover Avenue, Blackhawk, Meade County, SD
170. Photocopy of measured drawing (from National Record Center, Suitland, ...
170. Photocopy of measured drawing (from National Record Center, Suitland, Maryland, R.G. 121-76-301, Box 83, No. DC 0020 ZZ 29) 'F. N.,' delineator 28 September 1938 INTERIOR, FIRST FLOOR, MAIN CORRIDOR, INDIAN ARTS AND CRAFTS SHOP, ROOM 1023, DETAIL OF TIN LIGHT SCONCE - U.S. Department of the Interior, Eighteenth & C Streets Northwest, Washington, District of Columbia, DC
8. BUILDING NO. 611. INTERIOR OF ARMOR PLATELINED TESTING CHAMBER. ...
8. BUILDING NO. 611. INTERIOR OF ARMOR PLATE-LINED TESTING CHAMBER. 1/2' THICK ARMOR PLATING BOLTED TO WALLS, FLOOR AND CEILING. WALLS CONSTRUCTED OF 24' THICK REINFORCED CONCRETE. VENTS IN CEILING EXHAUST SMOKE FROM EXPLOSIONS. SMALLEST WHEELED VEHICLES HOLD DUDS. - Picatinny Arsenal, 600 Area, Test Areas District, State Route 15 near I-80, Dover, Morris County, NJ
REACTOR SERVICES BUILDING, TRA635, INTERIOR. ALSO KNOWN AS MATERIAL RECEIVING ...
REACTOR SERVICES BUILDING, TRA-635, INTERIOR. ALSO KNOWN AS MATERIAL RECEIVING AREA AND LABORATORY. CAMERA ON FIRST FLOOR FACING NORTH TOWARD MTR BUILDING. MOCK-UP AREA WAS TO THE RIGHT OF VIEW. INL NEGATIVE NO. HD46-10-1. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
16. Interior view, greenhouse, south wall taken from the ground. ...
16. Interior view, greenhouse, south wall taken from the ground. The original floor height is indicated by the joists on the left. The large opening on the right was formerly fitted with an exterior-fed iron stove used to heat the space on particularly cold days. - John Bartram House & Garden, Greenhouse, 54th Street & LIndbergh Boulevard, Philadelphia, Philadelphia County, PA
Housing and Wood Products Assessment.
1982-12-10
1981 to a peak of of floor area, the North Central almost 3 million in 1972 when region 1,670 square feet, the government subsidy programs were South...other masonry alterations. lumber by plywood. Lumber has Interior decorative panel already been effectively elimina- products are also used widely in...possible savings in walls . already been effectively elimi- is 25 percent and 40 percent on nated in these markets and future roofs. Wood joist floor
Application of stiffened cylinder analysis to ATP interior noise studies
NASA Technical Reports Server (NTRS)
Wilby, E. G.; Wilby, J. F.
1983-01-01
An analytical model developed to predict the interior noise of propeller driven aircraft was applied to experimental configurations for a Fairchild Swearingen Metro II fuselage exposed to simulated propeller excitation. The floor structure of the test fuselage was of unusual construction - mounted on air springs. As a consequence, the analytical model was extended to include a floor treatment transmission coefficient which could be used to describe vibration attenuation through the mounts. Good agreement was obtained between measured and predicted noise reductions when the foor treatment transmission loss was about 20 dB - a value which is consistent with the vibration attenuation provided by the mounts. The analytical model was also adapted to allow the prediction of noise reductions associated with boundary layer excitation as well as propeller and reverberant noise.
MTR WING, TRA604, INTERIOR. BASEMENT. INTERIOR VIEW FROM SAME LOCATION ...
MTR WING, TRA-604, INTERIOR. BASEMENT. INTERIOR VIEW FROM SAME LOCATION IN WEST CORRIDOR AS PHOTO ID-33-G-42 BUT CAMERA FACES SOUTH. SIGN ON DOOR FOR "PIPE TUNNEL" WARNS OF RADIOLOGICAL AND ASBESTOS HAZARDS. DOOR HAS METAL HASPS. SIGN ON OVERHEAD WASTE HEAT RECOVERY PIPES SAYS THEY CONTAIN "ASBESTOS FREE INSULATION." FIRE DOOR AT LEFT LEADS TO STAIRWAY TO FIRST FLOOR. DOOR AT RIGHT LEADS TO ROOM WHICH ONCE CONTAINED MTR LIBRARY. INL NEGATIVE NO. HD46-13-4. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
14. INTERIOR OF ROOM 101 LOOKING NORTHWEST. SIX OVER SIX ...
14. INTERIOR OF ROOM 101 LOOKING NORTHWEST. SIX OVER SIX LITE WOOD FRAME WINDOWS ARE CENTERED ON NORTHEAST AND NORTHWEST WALLS. ADDED TREATMENT TO WALLS IS A GYPSUM BOARD FINISH WITH WOOD TRIM, BOTH PAINTED. ADDED FLOOR TREATMENT IS VINYL COMPOSITION TILE. - Presidio of San Francisco, Cavalry Stables, Cowles Street, between Lincoln Boulevard & McDowell Street, San Francisco, San Francisco County, CA
56. Interior detail, porch chamber, ionic capital volute. It is ...
56. Interior detail, porch chamber, ionic capital volute. It is believed that John Bartram originally intended to have an open porch on the second floor and carved the first column capital three-quarters in-the-round on account of this. He later decided to enclose this space, but the volute remained. - John Bartram House & Garden, House, 54th Street & Lindbergh Boulevard, Philadelphia, Philadelphia County, PA
10. INTERIOR VIEW OF ROOM 110, LOOKING NORTHWEST FROM THE ...
10. INTERIOR VIEW OF ROOM 110, LOOKING NORTHWEST FROM THE EAST CORNER. SPACE IS DIVIDED BY EXPOSED POSTS AND BEAMS DESIGNATING ANIMALS QUARTERS AND AISLES. FLOORS ARE WOOD PLANKS IN ANIMAL AREAS CHANGING TO CONCRETE IN CENTER AISLES. CEILING IS GYPSUM BOARD. - Presidio of San Francisco, Cavalry Stables, Cowles Street, between Lincoln Boulevard & McDowell Street, San Francisco, San Francisco County, CA
Regolith in the South Pole-Aitken Basin is Mainly Indigenous Material
NASA Technical Reports Server (NTRS)
Haskin, L. A.; Gillis, J. J.; Jolliff, B. L.; Korotev, R. L.
2003-01-01
This abstract is concerned with the probability that a mission to a site within the South Pole-Aitken basin (SPA) would yield a meaningful sample of typical SPA floor material. The probability seems favorable, barring a highly atypical landing site, because the chemical composition of the SPA interior, as determined remotely from orbit, is different from that of the surrounding lunar surface. How representative would the sample be? To what extent have lateral transport or later events compromised the original chemical and mineralogical composition of the floor material? Where or in what kind of deposit should the mission land to provide the best example? We address these questions from the point of view of modeling of impact ejecta deposits. SPA is the largest lunar impact basin. Shallow for its diameter, it has a subdued gravity signature, a lower albedo, and a more Th- and Ferich interior than the surrounding highlands (the Feldspathic Highlands Terrane, FHT). Its floor may represent noritic or perhaps (but less abundant) gabbroic lower crust of the FHT, the upper crust stripped away by the basin-forming impact, possibly an oblique one.
2. Historic American Buildings Survey Lanny Miyamoto, Photographer October 1958 ...
2. Historic American Buildings Survey Lanny Miyamoto, Photographer October 1958 INTERIOR, FROM FLOOR LEVEL, TOWARDS CHANCEL - Roman Catholic Cathedral of Baltimore, Cathedral Street, Baltimore, Independent City, MD
Active control of interior noise in model aircraft fuselages using piezoceramic actuators
NASA Technical Reports Server (NTRS)
Fuller, C. R.; Hansen, C. H.; Silcox, R. J.; Snyder, S. D.
1990-01-01
Active control of interior noise in model aircraft fuselages using piezoceramic actuators is experimentally studied. The actuators are bonded directly to the structure and error information is taken from up to two microphones located in the interior acoustic field. The results demonstrate that global attenuation of the order of 10 to 15 dB of interior noise can be achieved with piezoceramic actuators, irrespective of whether the shell system is vibrating at an acoustic or structural resonant frequency. The work also proves that active control using vibration (moment) inputs works well when a floor simulating that of an aircraft is installed in the model. This result suggests that the technique will be successful in controlling interior noise in realistic aircraft structures.
Structural Element Tests in Support of the Keyworker Blast Shelter Program
1985-10-01
forced concrete -lab with two transverse reinforced concrete floor beams to transfer the interior column loads to the floor slab. Using a roof slab... lateral buck- "-4 ling; however, this could have occurred after a column buckled and the roof collapsed. Since load cell 2 (middle column ) recorded the...ANALYSIS OF FREE-FIELD AND STRUCTURE LOADING DATA ... ........ .. 102 6.1.1 Loading Wave Velocity ........... .................... ... 102 6.1.2 Lateral
8. Historic American Buildings Survey, Ned Goode, Photographer July, 1960 ...
8. Historic American Buildings Survey, Ned Goode, Photographer July, 1960 INTERIOR, SECOND FLOOR, NORTHWEST CORNER. - American Life Insurance Company Building, 330-336 Walnut Street, Philadelphia, Philadelphia County, PA
6. Historic American Buildings Survey Nathaniel R. Ewan, Photographer March ...
6. Historic American Buildings Survey Nathaniel R. Ewan, Photographer March 3, 1937 INTERIOR - MURDERER'S CELL - SECOND FLOOR - Burlington County Prison, 128 High Street, Mount Holly, Burlington County, NJ
Photographic copy of construction drawing, U.S. Department of the Interior, ...
Photographic copy of construction drawing, U.S. Department of the Interior, Office of Indian Affairs, Supervising Construction Engineer, Albuquerque, New Mexico, 7 August 1936 (original print located at Albuquerque, New Mexico, 7 August 1936 (original print located at Albuquerque Area Office, Bureau of Indian Affairs, Albuquerque, New Mexico). First floor plan. - Southern Ute Boarding School, Boy's Dormitory, Ouray & Capote Drives, Ignacio, La Plata County, CO
18. BATHROOM INTERIOR SHOWING OPEN DOOR TO SOUTH BEDROOM AT ...
18. BATHROOM INTERIOR SHOWING OPEN DOOR TO SOUTH BEDROOM AT PHOTO CENTER, TOILET AT EXTREME PHOTO RIGHT BOTTOM, OPEN DOOR TO MEDICINE CABINET AT PHOTO RIGHT. A WALLPAPER WAINSCOT COVERS THE LOWER PORTION OF THE ORIGINAL FIBERBOARD WALL COVERING. THE FLOOR IS LINOLEUM. VIEW TO SOUTHEAST. - Big Creek Hydroelectric System, Big Creek Town, Operator House, Orchard Avenue south of Huntington Lake Road, Big Creek, Fresno County, CA
6. INTERIOR VIEW OF BASEMENT OF CA. 1948 FACTORY ADDITION, ...
6. INTERIOR VIEW OF BASEMENT OF CA. 1948 FACTORY ADDITION, WITH REINFORCED CONCRETE FRAME AND FLOOR OF REINFORCED CONCRETE TEE-BEAMS, LOOKING NORTH. AT LEFT IS DEEP DRAW, HEAVY PRESS MANUFACTURED BY E. W. BLISS CO., BROOKLYN, NEW YORK. PRESS #3-1/2 B, PATENTED BY E. W. BLISS CO., 1893. MANUFACTURERS PLATE INDICATES PRESS DATES FROM 1920. - Illinois Pure Aluminum Company, 109 Holmes Street, Lemont, Cook County, IL
FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda ...
FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. First floor plan, door transom schedule, interior finish schedule, sash schedule, exterior color schedule, and location plot plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. Al of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/25/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA
6. Historic American Buildings Survey Nathaniel R. Ewan, Photographer April ...
6. Historic American Buildings Survey Nathaniel R. Ewan, Photographer April 10, 1936 INTERIOR - STONE SUPPORT IN BASEMENT FOR FIRST FLOOR FIREPLACE - Pomona Hall, Park Boulevard & Euclid Avenue, Camden, Camden County, NJ
2015-04-01
Mercury's hollows are among its most distinctive -- and unusual -- surface features. In this stunning view, we see a field of hollows in the western portion of the floor of Zeami impact basin. Hollows populate much of the rest of the basin's interior, with large concentrations several kilometers across occurring in the north and northeast parts of the floor. Individual hollows, however, can be as small as a couple of hundred meters in width. http://photojournal.jpl.nasa.gov/catalog/PIA19267
Evaluation of the Impact of Slab Foundation Heat Transfer on Heating and Cooling in Florida
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parker, D.; Kono, J.; Vieira, R.
During the last three decades of energy-efficiency research, there has been limited study of heat transfer to slab-on-grade foundations in cooling-dominated climates. Most experimental research has focused on the impact of slab-on-grade foundations and insulation schemes on heat losses in heating-dominated climates. This is surprising because the floor area in single-family homes is generally equal to wall area, window area, or attic area, all of which have been extensively evaluated for heat-transfer properties. Moreover, slab foundations are the most common foundation type in cooling-dominated climates. Slab-on-grade construction is very popular in southern states, accounting for 77% of new home floorsmore » according to 2014 U.S. Census data. There is a widespread perception that tile flooring, as opposed to carpet, provides a cooler home interior in warm climates. Empirical research is needed because building energy simulation software programs running DOE-2 and EnergyPlus engines often rely on simplified models to evaluate the influence of flooring on interior temperature, even though in some cases more detailed models exist. The U.S. Department of Energy Building America Partnership for Improved Residential Construction (BA-PIRC) performed experiments in the Florida Solar Energy Center’s Flexible Residential Test Facility intended to assess for the first time (1) how slab-on-grade construction influences interior cooling in a cooling-dominated climate and (2) how the difference in a carpeted versus uncarpeted building might influence heating and cooling energy use. Two nominally identical side-by-side residential buildings were evaluated during the course of 1 year, from 2014 to 2015: the east building with a pad and carpet floor and the west building with a bare slab floor. A detailed grid shows temperature measurements taken on the slab surface at various locations as well as at depths of 1.0 ft, 2 ft, 5.0 ft, 10.0 ft, and 20.0 ft below the surface. Temperature measurements were taken at both buildings for more than 3 years prior to the experiments to ensure that the ground and foundation temperatures had fully come into equilibrium.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parker, D.; Kono, J.; Vieira, R.
During the last three decades of energy-efficiency research, there has been limited study of heat transfer to slab-on-grade foundations in cooling-dominated climates. Most experimental research has focused on the impact of slab-on-grade foundations and insulation schemes on heat losses in heating-dominated climates. This is surprising because the floor area in single-family homes is generally equal to wall area, window area, or attic area, all of which have been extensively evaluated for heat-transfer properties. Moreover, slab foundations are the most common foundation type in cooling-dominated climates. Slab-on-grade construction is very popular in southern states, accounting for 77% of new home floorsmore » according to 2014 U.S. Census data. There is a widespread perception that tile flooring, as opposed to carpet, provides a cooler home interior in warm climates. Empirical research is needed because building energy simulation software programs running DOE-2 and EnergyPlus engines often rely on simplified models to evaluate the influence of flooring on interior temperature, even though in some cases more detailed models exist. The U.S. Department of Energy Building America Partnership for Improved Residential Construction (BA-PIRC) performed experiments in the Florida Solar Energy Center’s Flexible Residential Test Facility intended to assess for the first time (1) how slab-on-grade construction influences interior cooling in a cooling-dominated climate and (2) how the difference in a carpeted versus uncarpeted building might influence heating and cooling energy use. Two nominally identical side-by-side residential buildings were evaluated during the course of 1 year, from 2014 to 2015: the east building with a pad and carpet floor and the west building with a bare slab floor. A detailed grid shows temperature measurements taken on the slab surface at various locations as well as at depths of 1.0 ft, 2 ft, 5.0 ft, 10.0 ft, and 20.0 ft below the surface. Temperature measurements were taken at both buildings for more than 3 years prior to the experiments to ensure that the ground and foundation temperatures had fully come into equilibrium.« less
NASA Astrophysics Data System (ADS)
Crown, D. A.; Yingst, R. A.; Mest, S. C.; Platz, T.; Williams, D. A.; Buczkowski, D.; Schenk, P.; Scully, J. E. C.; Jaumann, R.; Roatsch, T.; Preusker, F.; Nathues, A.; Hoffmann, M.; Schäfer, M.; Marchi, S.; De Sanctis, M. C.; Russell, C.; Raymond, C. A.
2015-12-01
We are conducting a geologic mapping investigation of the Ac-H-14 Yalode Quadrangle (21-66°S, 270-360°E) of Ceres to examine its surface geology and geologic history. At the time of this writing, geologic mapping has been performed on Dawn Framing Camera (FC) mosaics from the late Approach phase (up to 1.3 km/px) and Survey orbit (415 m/px), including clear filter and color images and digital terrain models derived from stereo images. In Fall 2015 images from the High Altitude Mapping Orbit (140 m/px) will be used to refine the mapping, followed by the Low Altitude Mapping Orbit (35 m/px) starting in December 2015. The Yalode Quadrangle is dominated by the ~300-km diameter impact basin Yalode and includes rugged and smooth terrains to the east. Yalode basin has a variably preserved rim, which is continuous and sharply defined to the north/northwest and is irregular or degraded elsewhere, and may have an interior ring structure. The basin floor includes hummocky and smooth areas (some bounded by scarps), crater chains, and a lineated zone. High-resolution images will be used to search for volcanic features on the basin floor and in association with basin structures. Yalode basin and its floor deposits appear to have been strongly affected by the Urvara impact to the west. Impact craters in Yalode Quadrangle display a range of preservation states. Degraded features, including Yalode basin and numerous smaller craters, exhibit subdued rims, lack discrete ejecta deposits, and have infilled interiors. More pristine features (including the large unnamed basin in the SE corner of the quadrangle and craters on Yalode basin floor) have well-defined, quasi-circular forms with prominent rims and in some cases discernible ejecta. Some of these craters have bowl-shaped interiors and others contain hills or mounds on their floors. Support of the Dawn Instrument, Operations, and Science Teams is acknowledged. This work is supported by grants from NASA, MPG, and DLR.
6. Historic American Buildings Survey, Theodore F. Dillon, Photographer, July, ...
6. Historic American Buildings Survey, Theodore F. Dillon, Photographer, July, 1959 INTERIOR, FIRST FLOOR, MIDDLE ROOM, BLUE TILE FIREPLACE. - Mutual Fire Insurance Company Building, Germantown Avenue & School House Lane, Philadelphia, Philadelphia County, PA
12. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...
12. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 DETAIL OF INTERIOR OF DOORWAY AT FRONT OF HALL ON FLOOR - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL
Rachmaninoff in Concert with Recently Named Craters on Mercury
2010-03-30
This NASA MESSENGER 3rd Mercury flyby image was quickly identified as a feature of high scientific interest, because of its fresh appearance, its distinctively colored interior plains, and extensional troughs on its floor.
Final Environmental Assessment, Family Camp Facility Buckey Air Force Base, Colorado
2008-02-07
Table 2-1 for details. This will provide restrooms, showers , and laundry facilities. The proposed FamCamp originally included ten new tent sites...compliant. Two shower stalls will be provided, one of which meets ADA requirements. The interior finishes will consist of ceramic tile floor...with one of the toilet stalls being ADA compliant. Two shower stalls will be provided, one of which meets ADA requirements. The interior finishes
2. VIEW OF INTERIOR, EAST SIDE (SIDE A) OF BUILDING ...
2. VIEW OF INTERIOR, EAST SIDE (SIDE A) OF BUILDING 883. INSTALLATION OF ROLLING MILLS AND MOLTEN SALT BATH EQUIPMENT FOR DEPLETED URANIUM FABRICATION. THE CRANE NEAR THE CEILING WAS USED TO INSTALL THE EQUIPMENT. BOXES ON THE FLOOR CONTAINED EQUIPMENT TO BE INSTALLED. (1/23/57) - Rocky Flats Plant, Uranium Rolling & Forming Operations, Southeast section of plant, southeast quadrant of intersection of Central Avenue & Eighth Street, Golden, Jefferson County, CO
41. Historic photo of Building 202 test cell interior, Robert ...
41. Historic photo of Building 202 test cell interior, Robert J. Gardener checking fuel implinging qualities of a twenty-thousand-pound-thrust rocket engine injector. Setting appears to be a platform mounted on top of scrubber tank underneath test cell floor, December 1959. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-52166. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
22. INTERIOR VIEW OF THE MACHINE SHOP LOOKING NORTH. FROM ...
22. INTERIOR VIEW OF THE MACHINE SHOP LOOKING NORTH. FROM LEFT TO RIGHT, NORTH END OF THE LONG LATHE, WOOD STOVE WITH A BRICK HEARTH FLOOR, FAR BACK LEFT CORNER IS THE MAIN CLUTCH FOR THE MILL POWER SHAFTS, SHAFT LATHE, SMALL PLANER, BORING MACHINE WITH IONIC COLUMN DETAIL., AND THE ENTRANCE TO THE ELECTRICAL MOTOR ROOM. - Standard Gold Mill, East of Bodie Creek, Northeast of Bodie, Bodie, Mono County, CA
8. Historic American Buildings Survey, William Heroy, Photographer February, 1979 ...
8. Historic American Buildings Survey, William Heroy, Photographer February, 1979 FIRST FLOOR OF GREENSBORO MOTOR COMPANY, SHOWROOM INTERIOR. - Buick Motor Company & Greensboro Motor Company Dealerships, 309 & 315 North Elm Street, Greensboro, Guilford County, NC
49 CFR 571.302 - Standard No. 302; Flammability of interior materials.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., head restraints, floor coverings, sun visors, curtains, shades, wheel housing covers, engine... seven to eight smooth, rounded teeth per 25 mm. S5.3Procedure. (a) Mount the specimen so that both sides...
24. Historical American Buildings Survey L. C. Durette, Photographer July ...
24. Historical American Buildings Survey L. C. Durette, Photographer July 27, 1936 INTERIOR OF GARRISON NORTH CORNER 2nd FLOOR LOGS CHIPPED TO RECEIVE INSIDE PLASTER - Gilman Garrison, Water & Clifford Streets, Exeter, Rockingham County, NH
19. Historic American Buildings Survey (Fed.), Stanley P. Mixon, Photographer ...
19. Historic American Buildings Survey (Fed.), Stanley P. Mixon, Photographer July 23, 1940, (P) INTERIOR, VIEW OF SOUTH WEST CORNER ROOM, FIRST FLOOR. - Hasbrouck House, Washington, Liberty, Lafayette, Colden Streets, Newburgh, Orange County, NY
12. Historic American Buildings Survey (Fed.) Stanley P. Mixon, Photographer ...
12. Historic American Buildings Survey (Fed.) Stanley P. Mixon, Photographer Sept. 14, 1940 (P) INTERIOR, DETAIL OF DOOR AND ARCHWAY, FRONT LIVING ROOM, FIRST FLOOR - Solomon Rockwell House, Prospect Street, Winsted, Litchfield County, CT
Code of Federal Regulations, 2010 CFR
2010-10-01
... cargo, and its interior walls and floors are free from protrusions. (2) Structurally serviceable means... equipment, mounting and securing chassis or vehicle, or insertion into ships' cells. (3) In addition...
4. Photocopy of photograph (from Iowa State University Library, Special ...
4. Photocopy of photograph (from Iowa State University Library, Special Collections) Photographer unknown post 1891 INTERIOR, FIRST FLOOR, DINING ROOM - Iowa State University, College Building, Morrill Road, site of Beardshear Hall, Ames, Story County, IA
Crusco, Salvatore; Jackson, Tiffany; Advincula, Arnold
2014-01-01
Robot-assisted laparoscopic surgery is often taught with the surgical mentor at the surgeon console and the trainee at the patient's bedside. The da Vinci dual console (Intuitive Surgical, Sunnyvale, California) allows a surgical mentor to teach with both the mentor and the trainee working at a surgeon console simultaneously. The purpose of this study is to evaluate the effectiveness of the dual console versus the single console for teaching medical students robotic tasks. Forty novice medical students were randomized to either the da Vinci single-console or dual-console group and were taught 4 knot-tying techniques by a surgical mentor. The students were timed while performing the tasks. No statistically significant differences in mean task times were observed between the single- and dual-console groups: interrupted stitch with a 2-handed knot (300 seconds for single vs 294 seconds for dual, P=.59), interrupted stitch with a 1-handed knot (198 seconds for single vs 212 seconds for dual, P=.88), figure-of-8 stitch with a 2-handed knot (261 seconds for single vs 219 seconds for dual, P=.20), and figure-of-8 stitch with a 1-handed knot (200 seconds for single vs 199 seconds for dual, P=.53). No significant difference was observed in performance time when teaching knot-tying techniques to medical students using the da Vinci dual console compared with the single console. More research needs to be performed on the utility of the da Vinci dual console in surgical training.
Jackson, Tiffany; Advincula, Arnold
2014-01-01
Background and Objectives: Robot-assisted laparoscopic surgery is often taught with the surgical mentor at the surgeon console and the trainee at the patient's bedside. The da Vinci dual console (Intuitive Surgical, Sunnyvale, California) allows a surgical mentor to teach with both the mentor and the trainee working at a surgeon console simultaneously. The purpose of this study is to evaluate the effectiveness of the dual console versus the single console for teaching medical students robotic tasks. Methods: Forty novice medical students were randomized to either the da Vinci single-console or dual-console group and were taught 4 knot-tying techniques by a surgical mentor. The students were timed while performing the tasks. Results: No statistically significant differences in mean task times were observed between the single- and dual-console groups: interrupted stitch with a 2-handed knot (300 seconds for single vs 294 seconds for dual, P = .59), interrupted stitch with a 1-handed knot (198 seconds for single vs 212 seconds for dual, P = .88), figure-of-8 stitch with a 2-handed knot (261 seconds for single vs 219 seconds for dual, P = .20), and figure-of-8 stitch with a 1-handed knot (200 seconds for single vs 199 seconds for dual, P = .53). Conclusion: No significant difference was observed in performance time when teaching knot-tying techniques to medical students using the da Vinci dual console compared with the single console. More research needs to be performed on the utility of the da Vinci dual console in surgical training. PMID:25392618
Noise reduction of a composite cylinder subjected to random acoustic excitation
NASA Technical Reports Server (NTRS)
Grosveld, Ferdinand W.; Beyer, T.
1989-01-01
Interior and exterior noise measurements were conducted on a stiffened composite floor-equipped cylinder, with and without an interior trim installed. Noise reduction was obtained for the case of random acoustic excitation in a diffuse field; the frequency range of interest was 100-800-Hz one-third octave bands. The measured data were compared with noise reduction predictions from the Propeller Aircraft Interior Noise (PAIN) program and from a statistical energy analysis. Structural model parameters were not predicted well by the PAIN program for the given input parameters; this resulted in incorrect noise reduction predictions for the lower one-third octave bands where the power flow into the interior of the cylinder was predicted on a mode-per-mode basis.
34. Interior of elevator tower, Block 31, looking northeast. Otis ...
34. Interior of elevator tower, Block 31, looking northeast. Otis Tandem Gearless Elevator Hoist (1941); floor selector (far left), in foreground is the motor generator set which includes exciter (left), AC motor (center), DC generator (right); beyond is the passenger motor (right), hoist cable and drum (center), freight motor (left). - Columbia Basin Project, Grand Coulee Dam & Franklin D. Roosevelt Lake, Across Columbia River, Southeast of Town of Grand Coulee, Grand Coulee, Grant County, WA
11. INTERIOR OF ATTIC, VIEW FROM SOUTH END LOOKING AT ...
11. INTERIOR OF ATTIC, VIEW FROM SOUTH END LOOKING AT ROOF STRUCTURE ON EAST SIDE OF BUILDING. NOTE HEAVY TIMBER TRUSS SYSTEM WITH THIN, VERTICAL METAL SUPPORTS. THESE SUPPORTS WERE PROBABLY ADDED AFTER ALTERATIONS ON THE LOWER FLOORS IN THE LATE 1930s. THE PEELING PAINT ON THE TRUSS TIMBERS AND BEADED HORIZONTAL PANELING FURTHER INDICATES THAT THIS SPACE WAS FINISHED FOR USE AS A PRODUCTION AREA. - Graniteville Mill, Marshall Street, Graniteville, Aiken County, SC
Interior view, represent firstfloor resident room, located near the middle ...
Interior view, represent first-floor resident room, located near the middle of the south wing on the east side, looking west. The clerestory window located above the door facilitated better ventilation and admitted a degree of natural light to the windowless main corridor (note the bull's eye corner blocks of the greek revival architrave molding around the doorway across the corridor). - U. S. Naval Asylum, Biddle Hall, Gray's Ferry Avenue, Philadelphia, Philadelphia County, PA
32. INTERIOR VIEW LOOKING NORTH ON THE ORE BREAKER LEVEL. ...
32. INTERIOR VIEW LOOKING NORTH ON THE ORE BREAKER LEVEL. THE ORE BREAKER, A BLAKE JAW CRUSHER, IS IN THE BOX IN THE LEFT OF THE PHOTOGRAPH, THE ORE TO BE BROKEN IS FED INTO THE OPENING ON THE FLOOR AND NEXT TO ORE BREAKER BOX. THE GRIZZLY BARS ARE ON THE RIGHT AND THE PULLEYS FROM THE POWER SYSTEM ARE OVERHEAD. - Standard Gold Mill, East of Bodie Creek, Northeast of Bodie, Bodie, Mono County, CA
Overall interior view of structures shop (11 shop) located on ...
Overall interior view of structures shop (11 shop) located on west side of building 57 - looking north; the south end of the structures shop was devoted to welding heavy plate foundations and ship components; the floor is fabricated of case steel and features a grillwork of 1 1/2 fabricated holes which are used as sockets for gripping position pins. - Naval Base Philadelphia-Philadelphia Naval Shipyard, Structure Shop, League Island, Philadelphia, Philadelphia County, PA
Ivory, James D; Magee, Robert G
2009-06-01
Portable media consoles are becoming extremely popular devices for viewing a number of different types of media content, both for entertainment and for educational purposes. Given the increasingly heavy use of portable consoles as an alternative to traditional television-style monitors, it is important to investigate how physiological and psychological effects of portable consoles may differ from those of television-based consoles, because such differences in physiological and psychological responses may precipitate differences in the delivered content's effectiveness. Because portable consoles are popular as a delivery system for multiple types of media content, such as movies and video games, it is also important to investigate whether differences between the effects of portable and television-based consoles are consistent across multiple types of media. This article reports a 2 x 2 (console: portable or television-based x medium: video game or movie) mixed factorial design experiment with physiological arousal and self-reported flow experience as dependent variables, designed to explore whether console type affects media experiences and whether these effects are consistent across different media. Results indicate that portable media consoles evoke lower levels of physiological arousal and flow experience and that this effect is consistent for both video games and movies. These findings suggest that even though portable media consoles are often convenient compared to television-based consoles, the convenience may come at a cost in terms of the user experience.
D'Souza, Clive; Paquet, Victor L; Lenker, James A; Steinfeld, Edward
2017-11-13
Low ridership of public transit buses among wheeled mobility device users suggests the need to identify vehicle design conditions that are either particularly accommodating or challenging. The objective of this study was to determine the effects of low-floor bus interior seating configuration and passenger load on wheeled mobility device user-reported difficulty, overall acceptability and design preference. Forty-eight wheeled mobility users evaluated three interior design layouts at two levels of passenger load (high vs. low) after simulating boarding and disembarking tasks on a static full-scale low-floor bus mockup. User self-reports of task difficulty, acceptability and design preference were analyzed across the different test conditions. Ramp ascent was the most difficult task for manual wheelchair users relative to other tasks. The most difficult tasks for users of power wheelchairs and scooters were related to interior circulation, including moving to the securement area, entry and positioning in the securement area and exiting the securement area. Boarding and disembarking at the rear doorway was significantly more acceptable and preferred compared to the layouts with front doorways. Understanding transit usability barriers, perceptions and preferences among wheeled mobility users is an important consideration for clinicians who recommend mobility-related device interventions to those who use public transportation. Implications for Rehabilitation In order to maximize community participation opportunities for wheeled mobility users, clinicians should consider potential public transit barriers during the processes of wheelchair device selection and skills training. Usability barriers experienced by wheeled mobility device users on transit vehicles differ by mobility device type and vehicle configurations. Full-scale environment simulations are an effective means of identifying usability barriers and design needs in people with mobility impairments and may provide an alternative model for determining readiness for using fixed route buses or eligibility for paratransit.
Rodriguez, J.A.P.; Tanaka, K.L.; Yamamoto, A.; Berman, D.C.; Zimbelman, J.R.; Kargel, J.S.; Sasaki, S.; Jinguo, Y.; Miyamoto, H.
2010-01-01
Wind streaks comprise recent aeolian deposits that have been extensively documented on Venus, Earth and Mars. Martian wind streaks are among the most abundant surface features on the planet and commonly extend from the downwind margins of impact craters. Previous studies of wind streaks emerging from crater interior deposits suggested that the mode of emplacement was primarily related to the deposition of silt-sized particles as these settled from plumes. We have performed geologic investigations of two wind streaks clusters; one situated in western Arabia Terra, a region in the northern hemisphere of Mars, and another in an analogous terrestrial site located in southern Patagonia, Argentina, where occurrences of wind streaks emanate from playas within maar craters. In both these regions we have identified bedforms in sedimentary deposits on crater floors, along wind-facing interior crater margins, and along wind streaks. These observations indicate that these deposits contain sand-sized particles and that sediment migration has occurred via saltation from crater interior deposits to wind streaks. In Arabia Terra and in Patagonia wind streaks initiate from crater floors that contain lithic and evaporitic sedimentary deposits, suggesting that the composition of wind streak source materials has played an important role in development. Spatial and topographic analyses suggest that regional clustering of wind streaks in the studied regions directly correlates to the areal density of craters with interior deposits, the degree of proximity of these deposits, and the craters' rim-to-floor depths. In addition, some (but not all) wind streaks within the studied clusters have propagated at comparable yearly (Earth years) rates. Extensive saltation is inferred to have been involved in its propagation based on the studied terrestrial wind streak that shows ripples and dunes on its surface and the Martian counterpart changes orientation toward the downslope direction where it extends into an impact crater. ?? 2009 Elsevier B.V.
5. Historic American Buildings Survey, Theodore F. Dillon, Photographer, July, ...
5. Historic American Buildings Survey, Theodore F. Dillon, Photographer, July, 1959 INTERIOR, FIRST FLOOR, FRONT DETAIL OF TERRA COTTA, BRICK AND TILE FIREPLACE. - Mutual Fire Insurance Company Building, Germantown Avenue & School House Lane, Philadelphia, Philadelphia County, PA
8. Historic American Buildings Survey, July 27, 1940, Stanley P. ...
8. Historic American Buildings Survey, July 27, 1940, Stanley P. Mixon, Photographer, (G) INTERIOR, WEST SIDE OF REAR ROOM, FIRST FLOOR (FIREPLACE WAS REBUILT, I(#(). - Lasher House, State Route 9G Vicinity, Germantown, Columbia County, NY
28. Historic American Buildings Survey E. W. Russell, Photographer, May ...
28. Historic American Buildings Survey E. W. Russell, Photographer, May 7, 1936 INTERIOR VIEW OF MAIN ENTRANCE TO MAIN HALL, 1st FLOOR - Spring Hill College, Main Building, Old Shell Road, Spring Hill, Mobile County, AL
Automatic Generation of Indoor Navigable Space Using a Point Cloud and its Scanner Trajectory
NASA Astrophysics Data System (ADS)
Staats, B. R.; Diakité, A. A.; Voûte, R. L.; Zlatanova, S.
2017-09-01
Automatic generation of indoor navigable models is mostly based on 2D floor plans. However, in many cases the floor plans are out of date. Buildings are not always built according to their blue prints, interiors might change after a few years because of modified walls and doors, and furniture may be repositioned to the user's preferences. Therefore, new approaches for the quick recording of indoor environments should be investigated. This paper concentrates on laser scanning with a Mobile Laser Scanner (MLS) device. The MLS device stores a point cloud and its trajectory. If the MLS device is operated by a human, the trajectory contains information which can be used to distinguish different surfaces. In this paper a method is presented for the identification of walkable surfaces based on the analysis of the point cloud and the trajectory of the MLS scanner. This method consists of several steps. First, the point cloud is voxelized. Second, the trajectory is analysing and projecting to acquire seed voxels. Third, these seed voxels are generated into floor regions by the use of a region growing process. By identifying dynamic objects, doors and furniture, these floor regions can be modified so that each region represents a specific navigable space inside a building as a free navigable voxel space. By combining the point cloud and its corresponding trajectory, the walkable space can be identified for any type of building even if the interior is scanned during business hours.
Roxberg, Åsa; Brunt, David; Rask, Mikael; da Silva, António Barbosa
2013-03-01
The aim of the study was to explore the meaning of consolation as experienced by Job in the Book of Job and as presented in literature and how consolation relates to suffering and care. The study's theoretical design applied Ricoeur's view on phenomenology and hermeneutics. The resulting themes were as follows: consolation that is present, that originates in confrontation, that keeps suffering at a distance, that does not alleviate suffering, that originates in experience from giving comfort, and that facilitates a change of perspective. The authentic and caring consolation accepts the sufferer's incomprehensible "otherness" but however provides no answers about how to console.
MTR WING A, TRA604, INTERIOR. BASEMENT. DETAIL OF A19 LAB ...
MTR WING A, TRA-604, INTERIOR. BASEMENT. DETAIL OF A-19 LAB AREA ALONG SOUTH WALL. SIGN ON FLOOR DIRECTS WORKERS TO OBTAIN WHOLE BODY FRISK UPON LEAVING AREA. SIGN ON EQUIPMENT IN CENTER OF VIEW REQUESTS WORKERS TO "NOTIFY HEALTH PHYSICS BEFORE WORKING ON THIS SYSTEM." CAMERA FACING SOUTHWEST. INL NEGATIVE NO. HD46-13-2. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
10. LIVING ROOM INTERIOR SHOWING 1 OVER 1 LIGHT, DOUBLEHUNG, ...
10. LIVING ROOM INTERIOR SHOWING 1 OVER 1 LIGHT, DOUBLEHUNG, WOOD-FRAME WINDOWS FLANKING FRONT ENTRANCE DOOR AND SOUTH END DOOR TO ENCLOSED SLEEPING PORCH/STAIR ACCESS TO ATTIC. CEILING AND WALLS IN THIS ROOM AND THROUGHOUT THE HOUSE ARE COVERED WITH ORIGINAL FIBERBOARD. THE FLOOR IN THIS ROOM AND ALL OTHERS EXCEPT THE BATHROOM, KITCHEN AND DINING ROOM ARE HARDWOOD. VIEW TO SOUTHEAST. - Big Creek Hydroelectric System, Big Creek Town, Operator House, Orchard Avenue south of Huntington Lake Road, Big Creek, Fresno County, CA
5. Photocopy of photograph (original in the collection of the ...
5. Photocopy of photograph (original in the collection of the Minnesota Historical Society) INTERIOR HALL, SHOWING MOSAIC FLOORS, MARBLE COLUMNS AND WALLS, AND GLASS SKYLIGHT - New York Life Insurance Company Building, Sixth & Minnesota Streets, Saint Paul, Ramsey County, MN
50. VIEW TO EAST; SOUTH END OF MBE BUILDING, FIRST ...
50. VIEW TO EAST; SOUTH END OF MBE BUILDING, FIRST FLOOR; SAFE, DOOR OPEN ELECTRONIC FLASH INTERIOR ILLUMINATION (Andersen) - Los Angeles Union Passenger Terminal, Mail, Baggage, & Express Building, 800 North Alameda Street, Los Angeles, Los Angeles County, CA
EXTERIOR ELEVATION, LOOKING SOUTH, ALSO SHOWING THE NORFOLK SOUTHERN STEAM ...
EXTERIOR ELEVATION, LOOKING SOUTH, ALSO SHOWING THE NORFOLK SOUTHERN STEAM RESTORATION FLOOR INTERIOR WITH A DRILL PRESS (LEFT) AND BORING MILL (RIGHT). - Norfolk & Southern Steam Locomotive No. 1218, Norris Yards, East of Ruffner Road, Irondale, Jefferson County, AL
6. Photograph of a photograph in possession of Rock Island ...
6. Photograph of a photograph in possession of Rock Island Arsenal Historical Office. BASEMENT, SHOWING ORIGINAL OPEN INTERIOR FLOOR PLAN. DATED C. 1898. - Rock Island Arsenal, Building No. 62, Rodman Avenue between First & Second Streets, Rock Island, Rock Island County, IL
52. VIEW TO EAST; SOUTH END OF MBE BUILDING, SECOND ...
52. VIEW TO EAST; SOUTH END OF MBE BUILDING, SECOND FLOOR; HIGHLY ALTERED INTERIOR OFFICE SPACE, FORMERLY REGIONAL OFFICES OF REA (Andersen) - Los Angeles Union Passenger Terminal, Mail, Baggage, & Express Building, 800 North Alameda Street, Los Angeles, Los Angeles County, CA
20. Historic American Buildings Survey, Stanley P. Mixon, Photographer September ...
20. Historic American Buildings Survey, Stanley P. Mixon, Photographer September 11, 1940 INTERIOR VIEW LOOKING EAST IN ATTIC (SECOND FLOOR) SHOWING ROOF CONSTRUCTION & CHIMNEY (LATER WALL OF SMOKE ROOM AT LEFT). - Fort Zeller, Mill Creek (Millcreek Township), Newmanstown, Lebanon County, PA
4. Historic American Buildings Survey, Nelson E. Baldwin, Photographer, Jan. ...
4. Historic American Buildings Survey, Nelson E. Baldwin, Photographer, Jan. 16, 1937, View - Second to Third Floor Stairs Old Homeopathic Hospital, 123 North Pearl St., Albany, N.Y. - Old Homeopathic Hospital (Interiors), 123 North Pearl Street, Albany, Albany County, NY
1. Historic American Buildings Survey, Nelson E. Baldwin, Photographer, Jan. ...
1. Historic American Buildings Survey, Nelson E. Baldwin, Photographer, Jan. 16, 1937, View - Stairway from First to Second Floor Old Homeopathic Hospital (Office of the HABS), Albany, N.Y. - Old Homeopathic Hospital (Interiors), 123 North Pearl Street, Albany, Albany County, NY
3. Historic American Buildings Survey, Nelson E. Baldwin, Photographer, Jan. ...
3. Historic American Buildings Survey, Nelson E. Baldwin, Photographer, Jan. 16, 1937, View - Double Doors and Columns in Apartment on First Floor, 123 North Pearl St., Albany, N.Y. - Old Homeopathic Hospital (Interiors), 123 North Pearl Street, Albany, Albany County, NY
12. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO ...
12. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO TAPE EQUIPMENT AND VOICE INTERCOM EQUIPMENT. THE MONITORS ABOVE GLASS WALL DISPLAY UNDERWATER TEST VIDEO TO CONTROL ROOM. FARTHEST CONSOLE ROW CONTAINS CAMERA SWITCHING, PANNING, TILTING, FOCUSING, AND ZOOMING. MIDDLE CONSOLE ROW CONTAINS TEST CONDUCTOR CONSOLES FOR MONITORING TEST ACTIVITIES AND DATA. THE CLOSEST CONSOLE ROW IS NBS FACILITY CONSOLES FOR TEST DIRECTOR, SAFETY AND QUALITY ASSURANCE REPRESENTATIVES. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL
13. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO ...
13. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO TAPE EQUIPMENT AND VOICE INTERCOM EQUIPMENT. THE MONITORS ABOVE GLASS WALL DISPLAY UNDERWATER TEST VIDEO TO CONTROL ROOM. FARTHEST CONSOLE ROW CONTAINS CAMERA SWITCHING, PANNING, TILTING, FOCUSING, AND ZOOMING. MIDDLE CONSOLE ROW CONTAINS TEST CONDUCTOR CONSOLES FOR MONITORING TEST ACTIVITIES AND DATA. THE CLOSEST CONSOLE ROW IS NBC FACILITY CONSOLES FOR TEST DIRECTOR, SAFETY AND QUALITY ASSURANCE REPRESENTATIVES. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL
NASA Technical Reports Server (NTRS)
Hillman, E.; Barlow, N. G.
2005-01-01
Impact craters containing central pits are rare on the terrestrial planets but common on icy bodies. Mars is the exception among the terrestrial planets, where central pits are seen on crater floors ( floor pits ) as well as on top of central peaks ( summit pits ). Wood et al. [1] proposed that degassing of subsurface volatiles during crater formation produced central pits. Croft [2] argued instead that central pits might form during the impact of volatile-rich comets. Although central pits are seen in impact craters on icy moons such as Ganymede, they do show some significant differences from their martian counterparts: (a) only floor pits are seen on Ganymede, and (b) central pits begin to occur at crater diameters where the peak ring interior morphology begins to appear in terrestrial planet craters [3]. A study of craters containing central pits was conducted by Barlow and Bradley [4] using Viking imagery. They found that 28% of craters displaying an interior morphology on Mars contain central pits. Diameters of craters containing central pits ranged from 16 to 64 km. Barlow and Bradley noted that summit pit craters tended to be smaller than craters containing floor pits. They also noted a correlation of central pit craters with the proposed rings of large impact basins. They argued that basin ring formation fractured the martian crust and allowed subsurface volatiles to concentrate in these locations. They favored the model that degassing of the substrate during crater formation was responsible for central pit formation due to the preferential location of central pit craters along these basin rings.
21 CFR 870.4220 - Cardiopulmonary bypass heart-lung machine console.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cardiopulmonary bypass heart-lung machine console... Cardiopulmonary bypass heart-lung machine console. (a) Identification. A cardiopulmonary bypass heart-lung machine... heart-lung machine. The console is designed to interface with the basic units used in a gas exchange...
36. View of preset counter (PC) console and tracking console ...
36. View of preset counter (PC) console and tracking console on right, located in MWOC facility in transmitter building no. 102. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
21 CFR 870.4220 - Cardiopulmonary bypass heart-lung machine console.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Cardiopulmonary bypass heart-lung machine console... Cardiopulmonary bypass heart-lung machine console. (a) Identification. A cardiopulmonary bypass heart-lung machine... heart-lung machine. The console is designed to interface with the basic units used in a gas exchange...
21 CFR 870.4220 - Cardiopulmonary bypass heart-lung machine console.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Cardiopulmonary bypass heart-lung machine console... Cardiopulmonary bypass heart-lung machine console. (a) Identification. A cardiopulmonary bypass heart-lung machine... heart-lung machine. The console is designed to interface with the basic units used in a gas exchange...
21 CFR 870.4220 - Cardiopulmonary bypass heart-lung machine console.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Cardiopulmonary bypass heart-lung machine console... Cardiopulmonary bypass heart-lung machine console. (a) Identification. A cardiopulmonary bypass heart-lung machine... heart-lung machine. The console is designed to interface with the basic units used in a gas exchange...
21 CFR 870.4220 - Cardiopulmonary bypass heart-lung machine console.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Cardiopulmonary bypass heart-lung machine console... Cardiopulmonary bypass heart-lung machine console. (a) Identification. A cardiopulmonary bypass heart-lung machine... heart-lung machine. The console is designed to interface with the basic units used in a gas exchange...
Code of Federal Regulations, 2010 CFR
2010-04-01
... areas of the building can be approached, entered, and used by individuals with physical disabilities... can be negotiated by a person with a severe disability using a wheelchair and that is also safe for and usable by people with other disabilities. Interior accessible routes may include corridors, floors...
HOT CELL BUILDING, TRA632, INTERIOR. DETAIL OF HOT CELL NO. ...
HOT CELL BUILDING, TRA-632, INTERIOR. DETAIL OF HOT CELL NO. 2 SHOWS MANIPULATION INSTRUMENTS AND SHIELDED OPERATING WINDOWS. PENETRATIONS FOR OPERATING INSTRUMENTS GO THROUGH SHIELDING ABOVE WINDOWS. CONDUIT FOR UTILITIES AND CONTROLS IS BEHIND METAL CABINET BELOW WINDOWS NEAR FLOOR. CAMERA FACES WEST. WARNING SIGN LIMITS FISSILE MATERIAL TO SPECIFIED NUMBER OF GRAMS OF URANIUM AND PLUTONIUM. INL NEGATIVE NO. HD46-28-2. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Activities Using a Restaurant Theme.
ERIC Educational Resources Information Center
Modlin, Ruth
Designed for use with elementary students, 44 activities using a restaurant theme integrate creative thinking and decision-making skills with language arts, mathematics, and art. The activities, which can be used independently by the students, deal with types of restaurants, names and themes, floor plans, interior and exterior design, house…
21. Photocopy of photograph (from the Essex Institute, negative number ...
21. Photocopy of photograph (from the Essex Institute, negative number 502) Frank Cousins, photographer 1891 INTERIOR, FIRST FLOOR, ROOM NO. 4 (SEE MEASURED DRAWINGS), NORTHEAST CORNER (Illustration #3 of Data Report included in Field Records) - Narbonne House, 71 Essex Street, Salem, Essex County, MA
2006-06-23
KENNEDY SPACE CENTER, FLA. - An overview of the new Firing Room 4 shows the expanse of computer stations and the various operations the facility will be able to manage. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis
2006-06-23
KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (center) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis
2006-06-23
KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (right) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis
2006-06-23
KENNEDY SPACE CENTER, FLA. - Ted Mosteller (right), NASA test director, briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis
NASA Technical Reports Server (NTRS)
Jozwiak, L. M.; Head, J. W., III; Neumann, G. A.; Wilson, L.
2016-01-01
Floor-fractured craters are a class of lunar crater hypothesized to form in response to the emplacement of a shallow magmatic intrusion beneath the crater floor. The emplacement of a shallow magmatic body should result in a positive Bouguer anomaly relative to unaltered complex craters, a signal which is observed for the average Bouguer anomaly interior to the crater walls. We observe the Bouguer anomaly of floor-fractured craters on an individual basis using the unfiltered Bouguer gravity solution from GRAIL and also a degree 100-600 band-filtered Bouguer gravity solution. The low-magnitude of anomalies arising from shallow magmatic intrusions makes identification using unfiltered Bouguer gravity solutions inconclusive. The observed anomalies in the degree 100-600 Bouguer gravity solution are spatially heterogeneous, although there is spatial correlation between volcanic surface morphologies and positive Bouguer anomalies. We interpret these observations to mean that the spatial heterogeneity observed in the Bouguer signal is the result of variable degrees of magmatic degassing within the intrusions.
This is an ESTE project summary brief. Many of the finished interior surfaces of homes and buildings are composed of materials that are prone to mold growth. These surfaces include gypsum board, wood flooring, insulation, and components of the heating and air conditioning system...
Use Hardwoods for Building Components
Glenn A. Cooper; William W. Rice
1968-01-01
Describes a system for prefabricating structural units from hardwoods for use in floors, roofs, and walls of a-frame or post-and-beam type construction. The interior face of the unit is decorative paneling; the exterior face is sheathing. Use of the system could reduce prefabricated house construction costs compared to conventional construction costs.
20. Photocopy of photograph (from the Essex Institute, negative number ...
20. Photocopy of photograph (from the Essex Institute, negative number 501) Frank Cousins, photographer 1891 INTERIOR, FIRST FLOOR, ROOM NO. 4 (SEE MEASURED DRAWINGS), SOUTH WALL, SHOWING FIREPLACE AND CORNER CUPBOARD (Illustration #2 of Data Report included in Field Records) - Narbonne House, 71 Essex Street, Salem, Essex County, MA
18. Detail view, greenhouse, north wall (Note the type of ...
18. Detail view, greenhouse, north wall (Note the type of stone used in the wall construction, the degradation of the interior stucco, and one of the pockets for a former floor joist). - John Bartram House & Garden, Greenhouse, 54th Street & LIndbergh Boulevard, Philadelphia, Philadelphia County, PA
57. Neg. No. F161D, Mar 18, 1933, INTERIORPRESSED STEEL AND ...
57. Neg. No. F-161D, Mar 18, 1933, INTERIOR-PRESSED STEEL AND WAREHOUSE BUILDINGS, 1ST FLOOR, SHOWING DAMAGE TO FREIGHT ELEVATOR SHAFT FROM EARTHQUAKE - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA
Bonobos respond to distress in others: consolation across the age spectrum.
Clay, Zanna; de Waal, Frans B M
2013-01-01
How animals respond to conflict provides key insights into the evolution of socio-cognitive and emotional capacities. Evidence from apes has shown that, after social conflicts, bystanders approach victims of aggression to offer stress-alleviating contact behavior, a phenomenon known as consolation. This other-orientated behavior depends on sensitivity to the other's emotional state, whereby the consoler acts to ameliorate the other's situation. We examined post-conflict interactions in bonobos (Pan paniscus) to identify the determinants of consolation and reconciliation. Thirty-six semi-free bonobos of all ages were observed at the Lola ya Bonobo Sanctuary, DR Congo, using standardized Post-conflict/Matched Control methods. Across age and sex classes, bonobos consoled victims and reconciled after conflicts using a suite of affiliative and socio-sexual behaviors including embracing, touching, and mounting. Juveniles were more likely to console than adults, challenging the assumption that comfort-giving rests on advanced cognitive mechanisms that emerge only with age. Mother-reared individuals were more likely to console than orphans, highlighting the role of rearing in emotional development. Consistent with previous studies, bystanders were more likely to console relatives or closely bonded partners. Effects of kinship, affiliation and rearing were similarly indicated in patterns of reconciliation. Nearby bystanders were significantly more likely to contact victims than more distal ones, and consolation was more likely in non-food contexts than during feeding. The results did not provide convincing evidence that bystander contacts served for self-protection or as substitutes for reconciliation. Overall, results indicate that a suite of social, developmental and contextual factors underlie consolation and reconciliation in bonobos and that a sensitivity to the emotions of others and the ability to provide appropriate consolatory behaviors emerges early in development.
Video game console usage and US national energy consumption: Results from a field-metering study
Desroches, Louis-Benoit; Greenblatt, Jeffery B.; Pratt, Stacy; ...
2014-10-23
There has been an increased in attention placed on the energy consumption of miscellaneous electronic loads in buildings by energy analysts and policymakers in recent years. The share of electricity consumed by consumer electronics in US households has increased in the last decade. Many devices, however, lack robust energy use data, making energy consumption estimates difficult and uncertain. Video game consoles are high-performance machines present in approximately half of all households and can consume a considerable amount of power. The precise usage of game consoles has significant uncertainty, however, leading to a wide range of recent national energy consumption estimates.more » We present here an analysis based on field-metered usage data, collected as part of a larger field metering study in the USA. This larger study collected data from 880 households in 2012 on a variety of devices, including 113 game consoles (the majority of which are Generation 7 consoles). From our metering, we find that although some consoles are left on nearly 24 h/day, the overall average usage is lower than many other studies have assumed, leading to a US national energy consumption estimate of 7.1 TWh in 2012. Nevertheless, there is an opportunity to reduce energy use with proper game console power management, as a substantial amount of game console usage occurs with the television turned off. The emergence of Generation 8 consoles may increase national energy consumption.« less
Video game console usage and US national energy consumption: Results from a field-metering study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Desroches, Louis-Benoit; Greenblatt, Jeffery B.; Pratt, Stacy
There has been an increased in attention placed on the energy consumption of miscellaneous electronic loads in buildings by energy analysts and policymakers in recent years. The share of electricity consumed by consumer electronics in US households has increased in the last decade. Many devices, however, lack robust energy use data, making energy consumption estimates difficult and uncertain. Video game consoles are high-performance machines present in approximately half of all households and can consume a considerable amount of power. The precise usage of game consoles has significant uncertainty, however, leading to a wide range of recent national energy consumption estimates.more » We present here an analysis based on field-metered usage data, collected as part of a larger field metering study in the USA. This larger study collected data from 880 households in 2012 on a variety of devices, including 113 game consoles (the majority of which are Generation 7 consoles). From our metering, we find that although some consoles are left on nearly 24 h/day, the overall average usage is lower than many other studies have assumed, leading to a US national energy consumption estimate of 7.1 TWh in 2012. Nevertheless, there is an opportunity to reduce energy use with proper game console power management, as a substantial amount of game console usage occurs with the television turned off. The emergence of Generation 8 consoles may increase national energy consumption.« less
One Way of Testing a Distributed Processor
NASA Technical Reports Server (NTRS)
Edstrom, R.; Kleckner, D.
1982-01-01
Launch processing for Space Shuttle is checked out, controlled, and monitored with new system. Entire system can be exercised by two computer programs--one in master console and other in each of operations consoles. Control program in each operations console detects change in status and begins task initiation. All of front-end processors are exercised from consoles through common data buffer, and all data are logged to processed-data recorder for posttest analysis.
Master Console System Monitoring and Control Development
NASA Technical Reports Server (NTRS)
Brooks, Russell A.
2013-01-01
The Master Console internship during the spring of 2013 involved the development of firing room displays at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I developed a system health and status display for use by Master Console Operators (MCO) to monitor and verify the integrity of the servers, gateways, network switches, and firewalls used in the firing room.
Microwave heating apparatus and method
Johnson, Andrew J.; Petersen, Robert D.; Swanson, Stephen D.
1990-01-01
An apparatus is provided for heating and melting materials using microwave energy, and for permitting them to solidify. The apparatus includes a microwave energy source, a resonant cavity having an opening in its floor, a microwave energy choke encompassing the opening in the floor of the cavity, a metal container to hold the materials to be heated and melted, a turntable, and a lift-table. During operation, the combined action of the turntable and the lift-table position the metal container so that the top of the container is level with the floor of the cavity, is in substantial registration with the floor opening, and is encompassed by the microwave energy choke; thus, during operation, the interior of the container defines part of the resonant cavity. Additionally, a screw feeder, extending into the cavity and sheltered from microwave energy by a conveyor choke, may convey the materials to be heated to the container. Also, preferably, the floor of the resonant cavity may include perforatins, so that the offgases and dust generated in the apparatus may be removed from the resonant cavity by pulling outside air between the container choke and the exterior wall of the container into the resonant cavity and out from the cavity through the perforations.
Consolation as possible expression of sympathetic concern among chimpanzees
Romero, Teresa; Castellanos, Miguel A.; de Waal, Frans B. M.
2010-01-01
Chimpanzees are known to spontaneously provide contact comfort to recent victims of aggression, a behavior known as consolation. Similar behavior in human children is attributed to empathic or sympathetic concern. In line with this empathy hypothesis, chimpanzee consolation has been shown to reduce the recipient's state of arousal, hence to likely alleviate distress. Other predictions from the empathy hypothesis have rarely been tested, however, owing to small sample sizes in previous studies. An exceptionally large database of spontaneous consolation in two outdoor-housed groups of chimpanzees lends further support to the empathy hypothesis in that consolation occurred disproportionally between individuals that are socially close (i.e., kin and affiliation partners) and was more typical of females than males, which differences are also known of human empathy. These effects were demonstrated using generalized linear mixed models, which control multiple variables at once. An exception to the above pattern was formed by the highest-ranking males, which frequently offered consolation to victims of aggression, probably as part of their general policing function in chimpanzee society. Consolation occurred more frequently in the absence of reconciliation between former opponents, suggesting that actors are sensitive to the contact need of victims of aggression, which may be greater if the aggressor ignores them. That consolation is an integrated part of close mutual relationships is supported by the tendency for it being reciprocated. PMID:20547864
Airborne sound transmission loss characteristics of woodframe construction
Fred F. Rudder
1985-01-01
This report summarizes the available data on the airborne sound transmission loss properties of wood-frame construction and evaluates the methods for predicting the airborne sound transmission loss. The first part of the report comprises a summary of sound transmission loss data for wood-frame interior walls and floor-ceiling construction. Data bases describing the...
32. Photocopy of photograph, ca. 1930 (original print on file ...
32. Photocopy of photograph, ca. 1930 (original print on file at U.S. Army Intelligence Security Command, Fort Belvoir, Virginia). INTERIOR VIEW TO WEST OF FIRST FLOOR ROOM TO NORTHWEST OF MAIN ENTRY IN MAIN BUILDING OF ARLINGTON HALL JUNIOR COLLEGE. - Arlington Hall Station, Main Building, 4000 Arlington Boulevard, Arlington, Arlington County, VA
NASA Technical Reports Server (NTRS)
Tanaka, K. L.; Banerdt, W. B.
2000-01-01
We conclude from MOC and MOLA data that the northern plains of Mars were infilled by a sediment-rich, mud ocean. Evidence for subsidence within the north polar basin and reversed channel-floor gradients are consistent with tectonic deformation due to the sediment load.
61. Upper panel in cornerpower panel lcpa lower panel in ...
61. Upper panel in corner-power panel lcpa lower panel in corner-oxygen regeneration unit, at right-air conditioner control panel, on floor-bio-pack 45 for emergency breathing, looking northwest - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD
65. Neg. No. F99, Dec 27, 1931, INTERIORPRESSED STEEL BUILDING ...
65. Neg. No. F-99, Dec 27, 1931, INTERIOR-PRESSED STEEL BUILDING FACING SOUTH TOWARD WAREHOUSE AND ASSEMBLY BUILDING 1ST FLOOR, EAST SIDE FACING SOUTH, SHOWING PRESSED STEEL MACHINERY AND RAILROAD CARS - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA
30 CFR 250.443 - What associated systems and related equipment must all BOP systems include?
Code of Federal Regulations, 2011 CFR
2011-07-01
... MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System... must be on the drilling floor. You must locate the other station in a readily accessible location away...
21 CFR 1020.40 - Cabinet x-ray systems.
Code of Federal Regulations, 2011 CFR
2011-04-01
... intended to prevent the generation of x radiation when access by any part of the human body to the interior... the floor of the system. (3) Ports and apertures. (i) The insertion of any part of the human body... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED...
21 CFR 1020.40 - Cabinet x-ray systems.
Code of Federal Regulations, 2010 CFR
2010-04-01
... intended to prevent the generation of x radiation when access by any part of the human body to the interior... the floor of the system. (3) Ports and apertures. (i) The insertion of any part of the human body... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED...
49 CFR 238.435 - Interior fittings and surfaces.
Code of Federal Regulations, 2012 CFR
2012-10-01
... expected to strike the fitting, when the floor of the passenger car decelerates with a triangular crash... attachment in a passenger car shall be designed to withstand, with deflection but without total failure, the... triangular crash pulse having a peak of 8g and a duration of 250 milliseconds. (b) Each seat back in a...
49 CFR 238.435 - Interior fittings and surfaces.
Code of Federal Regulations, 2013 CFR
2013-10-01
... expected to strike the fitting, when the floor of the passenger car decelerates with a triangular crash... attachment in a passenger car shall be designed to withstand, with deflection but without total failure, the... triangular crash pulse having a peak of 8g and a duration of 250 milliseconds. (b) Each seat back in a...
49 CFR 238.435 - Interior fittings and surfaces.
Code of Federal Regulations, 2014 CFR
2014-10-01
... expected to strike the fitting, when the floor of the passenger car decelerates with a triangular crash... attachment in a passenger car shall be designed to withstand, with deflection but without total failure, the... triangular crash pulse having a peak of 8g and a duration of 250 milliseconds. (b) Each seat back in a...
49 CFR 238.435 - Interior fittings and surfaces.
Code of Federal Regulations, 2011 CFR
2011-10-01
... expected to strike the fitting, when the floor of the passenger car decelerates with a triangular crash... attachment in a passenger car shall be designed to withstand, with deflection but without total failure, the... triangular crash pulse having a peak of 8g and a duration of 250 milliseconds. (b) Each seat back in a...
CROCKETT BARNS UPPER LEVEL, LOOKING NORTHEAST. This image shows the ...
CROCKETT BARNS UPPER LEVEL, LOOKING NORTHEAST. This image shows the construction of the three interior bents, the south end of the loft and stairs, the ladder leading to the cupola, and the dance floor added in 2006. - Crockett Farm, Barn, 1056 Fort Casey Road, Coupeville, Island County, WA
Handbook for inventorying surface fuels and biomass in the Interior West
James K. Brown; Rick D. Oberheu; Cameron M. Johnston
1982-01-01
Presents comprehensive procedures for inventorying weight per unit area of living and dead surface vegetation, to facilitate estimation of biomass and appraisal of fuels. Provides instructions for conducting fieldwork and calculating estimates of downed woody material, forest floor litter and duff, herbaceous vegetation, shrubs, and small conifers. Procedures produce...
Russell T. Graham; Theresa B. Jain
2007-01-01
Fire exclusion, especially in the dry forests (i.e. those dominated or potentially dominated by ponderosa pine) has most often altered tree and shrub composition and structure and, though often overlooked in many locales, the forest floor from conditions that occurred historically (pre-1900).
There is an urgent need to characterize potential risk to human health and the environment that arises from the manufacture and use of tens of thousands of chemicals. Computational tools and approaches for characterizing and prioritizing exposure are required: to provide input f...
Reconciliation and consolation in captive bonobos (Pan paniscus).
Palagi, Elisabetta; Paoli, Tommaso; Tarli, Silvana Borgognini
2004-01-01
Although reconciliation in bonobos (Pan paniscus) has previously been described, it has not been analyzed heretofore by the postconflict (PC) match-control (MC) method. Furthermore, although reconciliation has been investigated before in this species, consolation has not. In this study we analyzed agonistic and affiliative contacts in all sex-class combinations to clarify and reevaluate the occurrence of reconciliation in bonobos via the PC-MC method. We also investigated the occurrence of consolation by analyzing the victims' triadic contact tendency (TCT), the influence of the sex of victims, and the relative occurrence of consolation and reconciliation. We collected 167 pairs of PC-MC observations in a captive group of bonobos (in Apeldoorn, The Netherlands). The conciliatory tendency (CCT) we obtained was tendentially lower than the mean value previously found for Yerkes captive chimpanzees. Close relationships, which were present in all female-female (FF) and some male-female (MF) dyads, positively affected reconciliation rates. When only adult PC-MC pairs (157) were considered, the mean TCTs and CCTs did not differ significantly. When we focused on types of PC affiliative contact, in the case of consolation we found a striking preference for sociosexual patterns. As to the relative occurrence of consolation and reconciliation, the highest level of the former was found in the absence of the latter. When reconciliation took place, consolation generally preceded it, suggesting that consolation may be a substitutive behavior. Our findings suggest that even if reconciliation remains the best option, consolation may be an alternative substitute for reconciliation that is used to buffer the tension originating from an unresolved conflict. Reconciliation and consolation are complex phenomena that are probably related to the life history of a group. Given that few studies have been conducted on this subject, we can not at this time make any generalizations regarding conflict resolution in certain species by comparing results among studies. Copyright 2004 Wiley-Liss, Inc.
Neil, A; Ens, S; Pelletier, R; Jarus, T; Rand, D
2013-02-01
Virtual reality (VR) is an emerging trend in stroke rehabilitation. VR gaming consoles in stroke intervention have been shown to increase motivation and enjoyment during exercise. The amount and intensity of movements elicited using these consoles are unknown. The aims of this study were: (1) to quantify the amount and intensity of movement elicited from both hands of two groups of individuals ([chronic stroke and without a disability [healthy]); (2) to determine the effect of console (Wii/EyeToy) and group (stroke/healthy) on the amount and intensity of upper extremity movement; (3) to determine the effect of console (Wii/EyeToy) and group (stroke/healthy) on the usability and VR experience. A cross-sectional design was taken. Outpatient rehabilitation setting and healthy participant's homes. Participants included ten adults with stroke and ten adults without a disability. Participants experienced two games from each console. Amount and intensity of movement was measured using accelerometers on both wrists, while the virtual experience and usability was determined with questionnaires. No significant differences were found between the consoles usability and experience. EyeToy elicited significantly greater activity count than Wii among the healthy participants (P=0.028) and significantly greater movement intensity in both the stroke (P=0.005) and healthy (P=0.005) groups. Both consoles rated high for usability, enjoyment and satisfaction highlighting their suitability for a range of individuals in stroke rehabilitation. EyeToy provides increased movement and movement intensity. Both consoles are suitable for use in stroke rehabilitation however this information can be helpful to clinicians while selecting a gaming console according to the type and intensity of movements that he/she aims to encourage during therapy.
Maddison, Ralph; Mhurchu, Cliona Ni; Jull, Andrew; Jiang, Yannan; Prapavessis, Harry; Rodgers, Anthony
2007-08-01
This study sought to quantify the energy expenditure and physical activity associated with playing the "new generation" active and nonactive console-based video games in 21 children ages 10-14 years. Energy expenditure (kcal) derived from oxygen consumption (VO2) was continuously assessed while children played nonactive and active console video games. Physical activity was assessed continuously using the Actigraph accelerometer. Significant (p < .001) increases from baseline were found for energy expenditure (129-400%), heart rate (43-84%), and activity counts (122-1288 versus 0-23) when playing the active console video games. Playing active console video games over short periods of time is similar in intensity to light to moderate traditional physical activities such as walking, skipping, and jogging.
Master Console System Monitoring and Control Development
NASA Technical Reports Server (NTRS)
Brooks, Russell A.
2013-01-01
The Master Console internship during the summer of 2013 involved the development of firing room displays and support applications at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I created control scripts using the Application Control Language (ACL) to analyze the health and status of Kennedy Ground Control System (KGCS) programmable logic controllers (PLCs). This application provides a system health and status display I created with summarized data for use by Master Console Operators (MCO) to monitor and verify the integrity of KGCS subsystems.
Astronaut Owen Garriott at the Apollo Telescope Mount console
1973-08-08
Scientist-Astronaut Owen K. Garriott, science pilot of the Skylab 3 mission, is stationed at the Apollo Telescope Mount (ATM) console in the Multiple Docking Adapter of the Skylab space station in Earth orbit. From this console the astronauts actively control the ATM solar physics telescope.
Floor-Fractured Craters on Ceres and Implications for Internal Composition and Processes
NASA Astrophysics Data System (ADS)
Buczkowski, D.; Schenk, P.; Scully, J. E. C.; Park, R. S.; Preusker, F.; Raymond, C. A.; Russell, C. T.
2016-12-01
Several of the impact craters on Ceres have patterns of fractures on their floors. These fractures appear similar to those found within a class of lunar craters referred to as Floor-Fractured Craters (FFCs) [1]. Lunar FFCs are characterized by anomalously shallow floors cut by radial, concentric, and/or polygonal fractures, and have been classified into crater classes, Types 1 through 6, based on their morphometric properties [1,2]. Models for their formation have included both floor uplift due to magmatic intrusion below the crater or floor shallowing due to viscous relaxation. However, the observation that the depth versus diameter (d/D) relationship of the FFCs is distinctly shallower than the same association for other lunar craters supports the hypotheses that the floor fractures form due to shallow magmatic intrusion under the crater [2]. We have cataloged the Ceres FFCs according to the classification scheme designed for the Moon. Large (>50 km) Ceres FFCs are most consistent with Type 1 lunar FFCs, having deep floors, central peaks, wall terraces, and radial and/or concentric fractures. Smaller craters on Ceres are more consistent with Type 4 lunar FFCs, having less-pronounced floor fractures and v-shaped moats separating the wall scarp from the crater interior. An analysis of the d/D ratio for Ceres craters shows that, like lunar FFCs, the Ceres FFCs are anomalously shallow. This suggests that the fractures on the floor of Ceres FFCs may be due the intrusion of a low-density material below the craters that is uplifting their floors. While on the Moon the intrusive material is hypothesized to be silicate magma, this is unlikely for Ceres. However, a cryovolcanic extrusive edifice has been identified on Ceres [3], suggesting that cryomagmatic intrusions could be responsible for the formation of the Ceres FFCs. References: [1] Schultz P. (1976) Moon, 15, 241-273 [2] Jozwiak L.M. et al (2015) JGR 117, doi: 10.1029/2012JE004134 [3] Ruesch O. et al (2016) Science
43 CFR 3436.2-2 - Federal coal deposits subject to disposal by exchange.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Federal coal deposits subject to disposal... LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.2-2 Federal coal deposits subject to disposal by exchange. The coal deposits offered in exchange by the Secretary shall be...
43 CFR 3436.2-2 - Federal coal deposits subject to disposal by exchange.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Federal coal deposits subject to disposal... LEASES Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.2-2 Federal coal deposits subject to disposal by exchange. The coal deposits offered in exchange by the Secretary shall be...
2011-06-27
Development Generic Hull Testing Airbag and Sensor Technology Development Blast Data Recorder Specifications and Fielding Numerical Model Improvement...seat designs, airbag and restraint systems, and energy absorbing flooring solutions Vehicle event data recorders for collecting highly accurate...treatments. Airbag or comparable technologies such as bolsters. Sensors that can detect and deploy/trigger interior treatments within the timeframe of a
43 CFR 3436.1-2 - Federal coal deposits subject to lease by exchange.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Federal coal deposits subject to lease by... Coal Lease and Coal Land Exchanges: Alluvial Valley Floors § 3436.1-2 Federal coal deposits subject to... Federal coal deposits determined to be acceptable for further consideration for coal leasing pursuant to...
30 CFR 250.443 - What associated systems and related equipment must all BOP systems include?
Code of Federal Regulations, 2013 CFR
2013-07-01
... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.443 What... all BOP components. (b) At least two BOP control stations. One station must be on the drilling floor...
30 CFR 250.443 - What associated systems and related equipment must all BOP systems include?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.443 What associated systems... components. (b) At least two BOP control stations. One station must be on the drilling floor. You must locate...
30 CFR 250.443 - What associated systems and related equipment must all BOP systems include?
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.443 What... all BOP components. (b) At least two BOP control stations. One station must be on the drilling floor...