Sample records for iter interim design

  1. Design requirements for plasma facing materials in ITER

    NASA Astrophysics Data System (ADS)

    Matera, R.; Federici, G.; ITER Joint Central Team

    1996-10-01

    After the official approval of the Interim Design Report, the ITER project enters the final phase of the EDA. With the definition of the design requirements of the high heat flux components, the structural and armor materials' working domain is better specified, allowing to focus the R & D program on the most critical issues and to orient the design of divertor and first wall components towards those concepts which potentially have a better chance to withstand normal and off-normal operating conditions. Among the latter, slow, high-power, high recycling transient are at present driving the design of high heat flux components. Examples of possible design solution under experimental validation in the R & D program are presented and discussed in this paper.

  2. Prospects for Advanced Tokamak Operation of ITER

    NASA Astrophysics Data System (ADS)

    Neilson, George H.

    1996-11-01

    Previous studies have identified steady-state (or "advanced") modes for ITER, based on reverse-shear profiles and significant bootstrap current. A typical example has 12 MA of plasma current, 1,500 MW of fusion power, and 100 MW of heating and current-drive power. The implementation of these and other steady-state operating scenarios in the ITER device is examined in order to identify key design modifications that can enhance the prospects for successfully achieving advanced tokamak operating modes in ITER compatible with a single null divertor design. In particular, we examine plasma configurations that can be achieved by the ITER poloidal field system with either a monolithic central solenoid (as in the ITER Interim Design), or an alternate "hybrid" central solenoid design which provides for greater flexibility in the plasma shape. The increased control capability and expanded operating space provided by the hybrid central solenoid allows operation at high triangularity (beneficial for improving divertor performance through control of edge-localized modes and for increasing beta limits), and will make it much easier for ITER operators to establish an optimum startup trajectory leading to a high-performance, steady-state scenario. Vertical position control is examined because plasmas made accessible by the hybrid central solenoid can be more elongated and/or less well coupled to the conducting structure. Control of vertical-displacements using the external PF coils remains feasible over much of the expanded operating space. Further work is required to define the full spectrum of axisymmetric plasma disturbances requiring active control In addition to active axisymmetric control, advanced tokamak modes in ITER may require active control of kink modes on the resistive time scale of the conducting structure. This might be accomplished in ITER through the use of active control coils external to the vacuum vessel which are actuated by magnetic sensors near the first wall. The enhanced shaping and positioning flexibility provides a range of options for reducing the ripple-induced losses of fast alpha particles--a major limitation on ITER steady-state modes. An alternate approach that we are pursuing in parallel is the inclusion of ferromagnetic inserts to reduce the toroidal field ripple within the plasma chamber. The inclusion of modest design changes such as the hybrid central solenoid, active control coils for kink modes, and ferromagnetic inserts for TF ripple reduction show can greatly increase the flexibility to accommodate advance tokamak operation in ITER. Increased flexibility is important because the optimum operating scenario for ITER cannot be predicted with certainty. While low-inductance, reverse shear modes appear attractive for steady-state operation, high-inductance, high-beta modes are also viable candidates, and it is important that ITER have the flexibility to explore both these, and other, operating regimes.

  3. Classification methodology for tritiated waste requiring interim storage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cana, D.; Dall'ava, D.; Decanis, C.

    2015-03-15

    Fusion machines like the ITER experimental research facility will use tritium as fuel. Therefore, most of the solid radioactive waste will result not only from activation by 14 MeV neutrons, but also from contamination by tritium. As a consequence, optimizing the treatment process for waste containing tritium (tritiated waste) is a major challenge. This paper summarizes the studies conducted in France within the framework of the French national plan for the management of radioactive materials and waste. The paper recommends a reference program for managing this waste based on its sorting, treatment and packaging by the producer. It also recommendsmore » setting up a 50-year temporary storage facility to allow for tritium decay and designing future disposal facilities using tritiated radwaste characteristics as input data. This paper first describes this waste program and then details an optimized classification methodology which takes into account tritium decay over a 50-year storage period. The paper also describes a specific application for purely tritiated waste and discusses the set-up expected to be implemented for ITER decommissioning waste (current assumption). Comparison between this optimized approach and other viable detritiation techniques will be drawn. (authors)« less

  4. Validation of the MEPDG transfer functions using the LTPP test sections in Georgia task 2 interim report.

    DOT National Transportation Integrated Search

    2013-07-16

    The Georgia Department of Transportation (GDOT) is transitioning from empirical design procedures to the MEPDG : procedure for designing new and rehabilitated highway pavements. GDOT currently uses the 1972 AASHTO Interim : Guide for Design of Paveme...

  5. CMM Interim Check Design of Experiments (U)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Montano, Joshua Daniel

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factorsmore » (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.« less

  6. Conceptual design statement of work for the immobilized low-activity waste interim storage facility project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, T.A., Fluor Daniel Hanford

    1997-02-06

    The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.

  7. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  8. 46 CFR 153.482 - Stripping quantities and interim standards for Category C NLS tanks on ships built before July 1...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.482 Stripping quantities and interim standards for Category C NLS tanks on...

  9. 46 CFR 153.482 - Stripping quantities and interim standards for Category C NLS tanks on ships built before July 1...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.482 Stripping quantities and interim standards for Category C NLS tanks on...

  10. 46 CFR 153.482 - Stripping quantities and interim standards for Category C NLS tanks on ships built before July 1...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.482 Stripping quantities and interim standards for Category C NLS tanks on...

  11. 46 CFR 153.482 - Stripping quantities and interim standards for Category C NLS tanks on ships built before July 1...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.482 Stripping quantities and interim standards for Category C NLS tanks on...

  12. 46 CFR 153.482 - Stripping quantities and interim standards for Category C NLS tanks on ships built before July 1...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.482 Stripping quantities and interim standards for Category C NLS tanks on...

  13. Applications of Piezoelectric and Pyroelectric Thin Films: Opportunities for Langmuir-Blodgett Technology.

    DTIC Science & Technology

    1984-12-31

    LII IH"L 5 B 1.4 1111.6 MICROCOPY RESOLUTION TEST CHART SECURITY CLASSIFICATION OF THIS PAGE (MS’ien Dare Itere d) RED DSTUC ONS REPORT ...DOCUMENTATION PAGE BEFORE COMPLETIG FORM R NUMER . GOVT ACCESSION NO 5. RECIPIENT’S CATALOG iUMBER • TR-09 4. TITLE ( nd Subttle) S. TYPE OF REPORT A PERIOD...COVERELs Applications of Piezoelectric and Pyroelectric Technical Report -Interim Thin Films: Opportunities for Langmuir-Blodgett Technology 6. PERFORMING

  14. A phase II flexible screening design allowing for interim analysis and comparison with historical control.

    PubMed

    Wu, Wenting; Bot, Brian; Hu, Yan; Geyer, Susan M; Sargent, Daniel J

    2013-07-01

    Sargent and Goldberg [1] proposed a randomized phase II flexible screening design (SG design) which took multiple characteristics of candidate regimens into consideration in selecting a regimen for further phase III testing. In this paper, we extend the SG design by including provisions for an interim analysis and/or a comparison to a historical control. By including a comparison with a historical control, a modified SG design not only identifies a more promising treatment but also assures that the regimen has a clinically meaningful level of efficacy as compared to a historical control. By including an interim analysis, a modified SG design could reduce the number of patients exposed to inferior treatment regimens. When compared to the original SG design, the modified designs increase the sample size moderately, but expand the utility of the flexible screening design substantially. Copyright © 2013 Elsevier Inc. All rights reserved.

  15. 37 CFR 201.38 - Designation of agent to receive notification of claimed infringement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... person signing the Notice, and by the date of signature. (e) Filing. A service provider may file the.... The Copyright Office does not provide printed forms for filing an Interim Designation of Agent to... shall be accompanied by a filing fee for Recordation of an Interim Designation of Agent to Receive...

  16. The Effect of Iteration on the Design Performance of Primary School Children

    ERIC Educational Resources Information Center

    Looijenga, Annemarie; Klapwijk, Remke; de Vries, Marc J.

    2015-01-01

    Iteration during the design process is an essential element. Engineers optimize their design by iteration. Research on iteration in Primary Design Education is however scarce; possibly teachers believe they do not have enough time for iteration in daily classroom practices. Spontaneous playing behavior of children indicates that iteration fits in…

  17. Planning and Designing School Computer Facilities. Interim Report.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Finance and Administration Div.

    This publication provides suggestions and considerations that may be useful for school jurisdictions developing facilities for computers in schools. An interim report for both use and review, it is intended to assist school system planners in clarifying the specifications needed by the architects, other design consultants, and purchasers involved.…

  18. 78 FR 24331 - Apricots Grown in Designated Counties in Washington; Temporary Suspension of Handling Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Docket No. AMS-FV-12-0028... Regulations AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule... the marketing order for apricots grown in designated Counties in Washington. The interim rule...

  19. Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.; Hager, E. Paul

    1991-01-01

    The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.

  20. Designing Their Own: Increasing Urban High School Teacher Capacity for Creating Interim Assessments

    ERIC Educational Resources Information Center

    Ado, Kathryn

    2013-01-01

    This case study analyzes and documents factors that affect teacher learning and instructional practices in connection to the design your own (DYO) interim or periodic assessment process at one newly developed high school in New York City. Examining these factors through Riggan and Nabors Olah's (2011) conceptual framework offers insights into the…

  1. A WEB based approach in biomedical engineering design education.

    PubMed

    Enderle, J D; Browne, A F; Hallowell, M B

    1997-01-01

    As part of the accreditation process for university engineering programs, students are required to complete a minimum number of design credits in their course of study, typically at the senior level. Many call this the capstone course. Engineering design is a course or series of courses that bring together concepts and principles that students learn in their field of study--it involves the integration and extension of material learned in their major toward a specific project. Most often, the student is exposed to system-wide analysis, critique and evaluation for the first time. Design is an iterative, decision making process in which the student optimally applies previously learned material to meet a stated objective. At the University of Connecticut, students work in teams of 3-4 members and work on externally sponsored projects. To facilitate working with sponsors, a WEB based approach is used for reporting the progress on projects. Students are responsible for creating their own WEB sites that support both html and pdf formats. Students provide the following deliverables: weekly progress reports, project statement, specifications, project proposal, interim report, and final report. A senior design homepage also provides links to data books and other resources for use by students. We are also planning distance learning experiences between two campuses so students can work on projects that involve the use of video conferencing.

  2. The role of the Data and Safety Monitoring Board in a clinical trial: The CRISIS Study

    PubMed Central

    Holubkov, Richard; Casper, T. Charles; Dean, J. Michael; Anand, K. J. S.; Zimmerman, Jerry; Meert, Kathleen L.; Newth, Christopher J. L.; Berger, John; Harrison, Rick; Willson, Douglas F.; Nicholson, Carol

    2012-01-01

    Objective Randomized clinical trials are commonly overseen by a data and safety monitoring board (DSMB) comprised of experts in medicine, ethics, and biostatistics. DSMB responsibilities include protocol approval, interim review of study enrollment, protocol compliance, safety, and efficacy data. DSMB decisions can affect study design and conduct, as well as reported findings. Researchers must incorporate DSMB oversight into the design, monitoring, and reporting of randomized trials. Design Case study, narrative review. Methods The DSMB’s role during the comparative pediatric Critical Illness Stress-Induced Immune Suppression (CRISIS) Prevention Trial is described. Findings The NIH-appointed CRISIS DSMB was charged with monitoring sample size adequacy and feasibility, safety with respect to adverse events and 28-day mortality, and efficacy with respect to the primary nosocomial infection/sepsis outcome. The Federal Drug Administration also requested DSMB interim review before opening CRISIS to children below one year of age. The first interim analysis found higher 28-day mortality in one treatment arm. The DSMB maintained trial closure to younger children, and requested a second interim data review six months later. At this second meeting, mortality was no longer of concern, while a weak efficacy trend of lower infection/sepsis rates in one study arm emerged. As over 40% of total patients had been enrolled, the DSMB elected to examine conditional power, and unmask treatment arm identities. Upon finding somewhat greater efficacy in the placebo arm, the DSMB recommended stopping CRISIS due to futility. Conclusions The design and operating procedures of a multicenter randomized trial must consider a pivotal DSMB role. Maximum study design flexibility must be allowed, and investigators must be prepared for protocol modifications due to interim findings. The DSMB must have sufficient clinical and statistical expertise to assess potential importance of interim treatment differences in the setting of multiple looks at accumulating data with numerous outcomes and subgroups. PMID:23392377

  3. 46 CFR 153.481 - Stripping quantities and interim standards for Category B NLS tanks on ships built before July 1...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.481 Stripping quantities and interim standards for Category B NLS tanks on... paragraph (b)(1) of this section and does not automatically control the flow rate must have— (i) Manual...

  4. 46 CFR 153.481 - Stripping quantities and interim standards for Category B NLS tanks on ships built before July 1...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.481 Stripping quantities and interim standards for Category B NLS tanks on... paragraph (b)(1) of this section and does not automatically control the flow rate must have— (i) Manual...

  5. 46 CFR 153.481 - Stripping quantities and interim standards for Category B NLS tanks on ships built before July 1...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.481 Stripping quantities and interim standards for Category B NLS tanks on... paragraph (b)(1) of this section and does not automatically control the flow rate must have— (i) Manual...

  6. 46 CFR 153.481 - Stripping quantities and interim standards for Category B NLS tanks on ships built before July 1...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.481 Stripping quantities and interim standards for Category B NLS tanks on... paragraph (b)(1) of this section and does not automatically control the flow rate must have— (i) Manual...

  7. 46 CFR 153.481 - Stripping quantities and interim standards for Category B NLS tanks on ships built before July 1...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.481 Stripping quantities and interim standards for Category B NLS tanks on... paragraph (b)(1) of this section and does not automatically control the flow rate must have— (i) Manual...

  8. The WFIRST Interim Design Reference Mission: Capabilities, Constraints, and Open Questions

    NASA Technical Reports Server (NTRS)

    Kruk, Jeffrey W.

    2012-01-01

    The Project Office and Science Definition Team for the Wide-Field Infrared Survey Telescope (WFIRST) are in the midst of a pre-Phase A study to establish a Design Reference Mission (DRM). An Interim report was released in June 2011, with a final report due later in 2012. The predicted performance of the Interim DRM Observatory will be described, including optical quality, observing efficiency, and sensitivity for representative observing scenarios. Observing constraints and other limitations on performance will also be presented, with an emphasis on potential Guest Observer programs. Finally, a brief status update will be provided on open trade studies of interest to the scientific community. The final DRM may differ from the Interim DRM presented here. However, the underlying requirements of the scientific programs are not expected to change, hence the capabilities of the IDRM are likely to be maintained even if the implementation changes in significant ways.

  9. Immediate provisionalization with a CAD/CAM interim abutment and crown: a guided soft tissue healing technique.

    PubMed

    Proussaefs, Periklis

    2015-02-01

    A technique is described in which a single interim abutment and crown were fabricated in advance and placed the day of dental implant surgery. The contours of the interim crown were identical to the contours of a tentatively designed definitive prosthesis and allowed the tissue to heal and obtain contours that accommodated the contours of the definitive prosthesis. After osseointegration was established, a definitive impression was made with a custom computer-assisted design and computer-assisted manufacturing impression coping. The definitive prosthesis then was fabricated. Copyright © 2015 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  10. Interim Service ISDN Satellite (ISIS) hardware experiment design for advanced ISDN satellite design and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.

    1992-01-01

    The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Hardware Experiment Design for Advanced Satellite Designs describes the design of the ISDN Satellite Terminal Adapter (ISTA) capable of translating ISDN protocol traffic into time division multiple access (TDMA) signals for use by a communications satellite. The ISTA connects the Type 1 Network Termination (NT1) via the U-interface on the line termination side of the CPE to the V.35 interface for satellite uplink. The same ISTA converts in the opposite direction the V.35 to U-interface data with a simple switch setting.

  11. Defensive efficacy interim design: Dynamic benefit/risk ratio view using probability of success.

    PubMed

    Tang, Zhongwen

    2017-01-01

    Traditional efficacy interim design is based on alpha spending which does not have intuitive interpretation and hence is difficult to communicate with non-statistician colleagues. The alpha-spending approach is based on efficacy alone and hence does not have the flexibility to incorporate newly emerged safety signal. Newly emerged safety signal may nullify the originally set efficacy boundary. In contrast, the probability of success (POS) concept has intuitive interpretation and hence can facilitate our communication with non-statistician colleagues and help to obtain health authority (HA) buying. The success criteria of POS are not restricted to statistical significance. Hence, POS has the capability to incorporate both efficacy and safety information. We propose to use POS and its credible interval to design efficacy interim. In the proposed method, the efficacy boundary is adjustable to offset newly emerged safety signal.

  12. Report: EPA’s Management of Interim Status Permitting Needs Improvement to Ensure Continued Progress

    EPA Pesticide Factsheets

    Report #2007-P-00005, December 4, 2006. Interim status is a temporary designation, but some units have existed for as many as 25 years without formal issuance or denial of a permit, or other regulatory controls.

  13. Marine Biochemistry: A New Interdisciplinary Course for the Interim

    ERIC Educational Resources Information Center

    Goldberg, Arthur S.

    1976-01-01

    Discusses an undergraduate course which includes lectures, laboratory, and field trips and is designed for the interim winter semester. The course is interdisciplinary, involving a study of the biochemistry, pharmacology, and physiological significance of compounds from marine flora and fauna. (MLH)

  14. Interim Policy to Preserve Separated Personnel’s Electronically Stored Information Subject to Litigation Holds

    EPA Pesticide Factsheets

    This Interim Policy is designed to ensure the preservation of electronically stored information (ESI), created or received by EPA employees, contractors or grantees with user and email accounts on EPA networks, who have ended their employment with EPA.

  15. Interim Guidelines Growing Longleaf Seedlings in Containers

    Treesearch

    James P. Barnett; Mark J. Hainds; George A. Hernandez

    2002-01-01

    These interim guidelines are designed for producers and users of longleaf pine container stock. They are not meant to exclude any container product. The seedling specifications listed in the preferred category are attainable by the grower and will result in excellent field sur vival and early height growth.

  16. An Adaptive Staggered Dose Design for a Normal Endpoint.

    PubMed

    Wu, Joseph; Menon, Sandeep; Chang, Mark

    2015-01-01

    In a clinical trial where several doses are compared to a control, a multi-stage design that combines both the selection of the best dose and the confirmation of this selected dose is desirable. An example is the two-stage drop-the-losers or pick-the-winner design, where inferior doses are dropped after interim analysis. Selection of target dose(s) can be based on ranking of observed effects, hypothesis testing with adjustment for multiplicity, or other criteria at interim stages. A number of methods have been proposed and have made significant gains in trial efficiency. However, many of these designs started off with all doses with equal allocation and did not consider prioritizing the doses using existing dose-response information. We propose an adaptive staggered dose procedure that allows explicit prioritization of doses and applies error spending scheme that favors doses with assumed better responses. This design starts off with only a subset of the doses and adaptively adds new doses depending on interim results. Using simulation, we have shown that this design performs better in terms of increased statistical power than the drop-the-losers design given strong prior information of dose response.

  17. A two-stage patient enrichment adaptive design in phase II oncology trials.

    PubMed

    Song, James X

    2014-01-01

    Illustrated is the use of a patient enrichment adaptive design in a randomized phase II trial which allows the evaluation of treatment benefits by the biomarker expression level and makes interim adjustment according to the pre-specified rules. The design was applied to an actual phase II metastatic hepatocellular carcinoma (HCC) trial in which progression-free survival (PFS) in two biomarker-defined populations is evaluated at both interim and final analyses. As an extension, a short-term biomarker is used to predict the long-term PFS in a Bayesian model in order to improve the precision of hazard ratio (HR) estimate at the interim analysis. The characteristics of the extended design are examined in a number of scenarios via simulations. The recommended adaptive design is shown to be useful in a phase II setting. When a short-term maker which correlates with the long-term PFS is available, the design can be applied in smaller early phase trials in which PFS requires longer follow-up. In summary, the adaptive design offers flexibility in randomized phase II patient enrichment trials and should be considered in an overall personalized healthcare (PHC) strategy. Copyright © 2013 Elsevier Inc. All rights reserved.

  18. SLS INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE ARRIVAL

    NASA Image and Video Library

    2016-06-19

    SLS INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE ARRIVES AT WEST DOCK ON SHIELDS ROAD AND IS OFF LOADED FROM BARGEUAH ENGINEERING STUDENT ROBERT HILLAN TALKS TO SPACE STATION CREW MEMBERS ABOUT HIS WINNING 3-D PRINTED TOOL DESIGNED FOR USE ON ISS, AND IS INTERVIEWED BY LOCAL MEDIA

  19. Diversified Satellite Occupations Program. Interim Report.

    ERIC Educational Resources Information Center

    Call, John Reed

    This interim report, covering the period of September 1970 to June 1971, describes a program conducted for elementary, junior high, and senior high grades. The elementary program was designed to help students develop an understanding of occupational competence. The prevention of dropouts and individualizing instruction were concerns of the junior…

  20. Interim Alternative Educational Settings for Children with Disabilities.

    ERIC Educational Resources Information Center

    Bear, George G.; Quinn, Mary Magee; Burkholder, Susan

    This manual is intended to guide school administrators, teachers, school psychologists, and others with the design and implementation of interim alternative education settings (IAES) in compliance with the Individuals with Disabilities Education Act (IDEA) as amended in 1997. Chapter 1 discusses how the IAES evolved as a means of balancing the…

  1. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    ERIC Educational Resources Information Center

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  2. 78 FR 48503 - Proposed Revision to Missiles Generated by Extreme Winds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ...-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR..., ``Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants,'' and Interim Staff Guidance DC... and Hurricane Missiles for Nuclear Power Plants'' (ADAMS, Accession No. ML110940300), and Interim...

  3. The Urban Consumer Education Project. Interim Report, 1979-80.

    ERIC Educational Resources Information Center

    Marshall, Gail; Haas, Kay

    This interim evaluation report of the St. Louis, Missouri Urban Consumer Education Project assesses program effectiveness in terms of teacher training and teacher knowledge of consumer basics, community resource participation, and student and teacher knowledge. The project was designed to teach fifth grade students their rights and…

  4. Grabber arm mechanism for the Italian Research Interim Stage (IRIS)

    NASA Technical Reports Server (NTRS)

    Turci, Edmondo

    1987-01-01

    Two deployable arms, named grabbers, were designed and manufactured to provide lateral stability of the perigee spinning stage which will be deployed from the Space Shuttle cargo bay. The spinning stage is supported by a spin table on a cradle at its base. The Italian Research Interim Stage (IRIS) is designed to carry satellites of intermediate mass up to 900 kg. The requirements are defined and the mechanism is described. Functional test results are presented.

  5. A Digital Approach to Improved Overdentures for the Adolescent Oligodontia Patient.

    PubMed

    Cooper, Lyndon F; Culp, Lee; Luedin, Nicole

    2016-05-01

    The use of overdentures for treatment of oligodontia in adolescent patients using conventional techniques has described limitations. The aim of the case report is to demonstrate the use of CAD (Computer Aided Design) CAM (Computer Aided Manufacture) technology to produce an esthetic monolithic polymethylmethacrylate prosthesis that is retentive and stable on insertion. Adolescent oligodontia patients are typically not suitable candidates for dental implant therapy. Overdentures provide interim or definitive restorative advantages. Given the important esthetic, psychological, and social functions of the prosthesis, an important therapeutic goal for the overdenture prosthesis is esthetics. A CAD-CAM approach to overdenture manufacture can provide a highly esthetic, strong, and retentive prosthesis. CAD-CAM manufacture of monolithic acrylic overdentures offer several advantages that include (1) improved planning and clinical communication, (2) high fidelity manufacture, (3) improved flexural strength, impact strength, and porosity, (4) improved prosthesis integrity and durability (due to the monolithic design), (5) CNC control of occlusal contacts, (6) high esthetic potential due to quality of bulk material and iterative design, and (7) archival nature of the digital prosthesis. CAD-CAM manufacture of monolithic overdentures is a viable approach to completing high value esthetic management of the adolescent oligodontia patient. This case report identifies a new way to utilize CAD CAM technology to produce an improved overdenture for the oligodontia patient. It will be of interest to many and underscores the fundamental principles of smile design transfer to the digital environment. (J Esthet Restor Dent, 2016). © 2016 Wiley Periodicals, Inc.

  6. 76 FR 17159 - Office of New Reactors; Final Interim Staff Guidance on Standard Review Plan, Section 17.4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ... Interim Staff Guidance on Standard Review Plan, Section 17.4, ``Reliability Assurance Program'' AGENCY... design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard...

  7. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. OVERVIEW AND APPLICATION. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  8. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 4: ANALYTICAL GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  9. The role of the Data and Safety Monitoring Board in a clinical trial: the CRISIS study.

    PubMed

    Holubkov, Richard; Casper, T Charles; Dean, J Michael; Anand, K J S; Zimmerman, Jerry; Meert, Kathleen L; Newth, Christopher J L; Berger, John; Harrison, Rick; Willson, Douglas F; Nicholson, Carol

    2013-05-01

    Randomized clinical trials are commonly overseen by a Data and Safety Monitoring Board comprised of experts in medicine, ethics, and biostatistics. Data and Safety Monitoring Board responsibilities include protocol approval, interim review of study enrollment, protocol compliance, safety, and efficacy data. Data and Safety Monitoring Board decisions can affect study design and conduct, as well as reported findings. Researchers must incorporate Data and Safety Monitoring Board oversight into the design, monitoring, and reporting of randomized trials. Case study, narrative review. The Data and Safety Monitoring Board's role during the comparative pediatric Critical Illness Stress-Induced Immune Suppression (CRISIS) Prevention Trial is described. The National Institutes of Health-appointed CRISIS Data and Safety Monitoring Board was charged with monitoring sample size adequacy and feasibility, safety with respect to adverse events and 28-day mortality, and efficacy with respect to the primary nosocomial infection/sepsis outcome. The Federal Drug Administration also requested Data and Safety Monitoring Board interim review before opening CRISIS to children below 1 yr of age. The first interim analysis found higher 28-day mortality in one treatment arm. The Data and Safety Monitoring Board maintained trial closure to younger children and requested a second interim data review 6 months later. At this second meeting, mortality was no longer of concern, whereas a weak efficacy trend of lower infection/sepsis rates in one study arm emerged. As over 40% of total patients had been enrolled, the Data and Safety Monitoring Board elected to examine conditional power and unmask treatment arm identities. On finding somewhat greater efficacy in the placebo arm, the Data and Safety Monitoring Board recommended stopping CRISIS due to futility. The design and operating procedures of a multicenter randomized trial must consider a pivotal Data and Safety Monitoring Board role. Maximum study design flexibility must be allowed, and investigators must be prepared for protocol modifications due to interim findings. The Data and Safety Monitoring Board must have sufficient clinical and statistical expertise to assess potential importance of interim treatment differences in the setting of multiple looks at accumulating data with numerous outcomes and subgroups.

  10. Overview of International Thermonuclear Experimental Reactor (ITER) engineering design activities*

    NASA Astrophysics Data System (ADS)

    Shimomura, Y.

    1994-05-01

    The International Thermonuclear Experimental Reactor (ITER) [International Thermonuclear Experimental Reactor (ITER) (International Atomic Energy Agency, Vienna, 1988), ITER Documentation Series, No. 1] project is a multiphased project, presently proceeding under the auspices of the International Atomic Energy Agency according to the terms of a four-party agreement among the European Atomic Energy Community (EC), the Government of Japan (JA), the Government of the Russian Federation (RF), and the Government of the United States (US), ``the Parties.'' The ITER project is based on the tokamak, a Russian invention, and has since been brought to a high level of development in all major fusion programs in the world. The objective of ITER is to demonstrate the scientific and technological feasibility of fusion energy for peaceful purposes. The ITER design is being developed, with support from the Parties' four Home Teams and is in progress by the Joint Central Team. An overview of ITER Design activities is presented.

  11. ITER Magnet Feeder: Design, Manufacturing and Integration

    NASA Astrophysics Data System (ADS)

    CHEN, Yonghua; ILIN, Y.; M., SU; C., NICHOLAS; BAUER, P.; JAROMIR, F.; LU, Kun; CHENG, Yong; SONG, Yuntao; LIU, Chen; HUANG, Xiongyi; ZHOU, Tingzhi; SHEN, Guang; WANG, Zhongwei; FENG, Hansheng; SHEN, Junsong

    2015-03-01

    The International Thermonuclear Experimental Reactor (ITER) feeder procurement is now well underway. The feeder design has been improved by the feeder teams at the ITER Organization (IO) and the Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP) in the last 2 years along with analyses and qualification activities. The feeder design is being progressively finalized. In addition, the preparation of qualification and manufacturing are well scheduled at ASIPP. This paper mainly presents the design, the overview of manufacturing and the status of integration on the ITER magnet feeders. supported by the National Special Support for R&D on Science and Technology for ITER (Ministry of Public Security of the People's Republic of China-MPS) (No. 2008GB102000)

  12. Modeling Parenting Programs as an Interim Service for Families Waiting for Children's Mental Health Treatment.

    PubMed

    Cunningham, Charles E; Rimas, Heather; Chen, Yvonne; Deal, Ken; McGrath, Patrick; Lingley-Pottie, Patricia; Reid, Graham J; Lipman, Ellen; Corkum, Penny

    2015-01-01

    Using a discrete choice conjoint experiment, we explored the design of parenting programs as an interim strategy for families waiting for children's mental health treatment. Latent class analysis yielded 4 segments with different design preferences. Simulations predicted the Fast-Paced Personal Contact segment, 22.1% of the sample, would prefer weekly therapist-led parenting groups. The Moderate-Paced Personal Contact segment (24.7%) preferred twice-monthly therapist-led parenting groups with twice-monthly lessons. The Moderate-Paced E-Contact segment (36.3%), preferred weekly to twice-monthly contacts, e-mail networking, and a program combining therapist-led sessions with the support of a computerized telephone e-coach. The Slow-Paced E-Contact segment (16.9%) preferred an approach combining monthly therapist-led sessions, e-coaching, and e-mail networking with other parents. Simulations predicted 45.3% of parents would utilize an option combining 5 therapist coaching calls with 5 e-coaching calls, a model that could reduce costs and extend the availability of interim services. Although 41.0% preferred weekly pacing, 58% were predicted to choose an interim parenting service conducted at a twice-monthly to monthly pace. The results of this study suggest that developing interim services reflecting parental preferences requires a choice of formats that includes parenting groups, telephone-coached distance programs, and e-coaching options conducted at a flexible pace.

  13. INTERIM -- Starlink Software Environment

    NASA Astrophysics Data System (ADS)

    Pearce, Dave; Pavelin, Cliff; Lawden, M. D.

    Early versions of this paper were based on a number of other papers produced at a very early stage of the Starlink project. They contained a description of a specific implementation of a subroutine library, speculations on the desirable attributes of a software environment, and future development plans. They reflected the experimental nature of the Starlink software environment at that time. Since then, the situation has changed. The implemented subroutine library, INTERIM_DIR:INTERIM.OLB, is now a well established and widely used piece of software. A completely new Starlink software environment (ADAM) has been developed and distributed. Thus the library released in 1980 as `STARLINK' and now called `INTERIM' has reached the end of its development cycle and is now frozen in its current state, apart from bug corrections. This paper has, therefore, been completely rewritten and restructured to reflect the new situation. Its aim is to describe the facilities of the INTERIM subroutine library as clearly and concisely as possible. It avoids speculation, discussion of design decisions, and announcements of future plans.

  14. Multiphysics Engineering Analysis for an Integrated Design of ITER Diagnostic First Wall and Diagnostic Shield Module Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhai, Y.; Loesser, G.; Smith, M.

    ITER diagnostic first walls (DFWs) and diagnostic shield modules (DSMs) inside the port plugs (PPs) are designed to protect diagnostic instrument and components from a harsh plasma environment and provide structural support while allowing for diagnostic access to the plasma. The design of DFWs and DSMs are driven by 1) plasma radiation and nuclear heating during normal operation 2) electromagnetic loads during plasma events and associate component structural responses. A multi-physics engineering analysis protocol for the design has been established at Princeton Plasma Physics Laboratory and it was used for the design of ITER DFWs and DSMs. The analyses weremore » performed to address challenging design issues based on resultant stresses and deflections of the DFW-DSM-PP assembly for the main load cases. ITER Structural Design Criteria for In-Vessel Components (SDC-IC) required for design by analysis and three major issues driving the mechanical design of ITER DFWs are discussed. The general guidelines for the DSM design have been established as a result of design parametric studies.« less

  15. A Proposal: The Circular School Year.

    ERIC Educational Resources Information Center

    Reeves, Robert L.

    A proposed plan outlined in this speech divides the school year into three instructional units of 12 weeks each during which time student attendance is required. Three interim units of 15 work days and five vacation days are scheduled in April, August, and December. These interim units are designed to be used by students for remedial work,…

  16. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  17. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS, MODULE 3: SITE CHARACTERIZATION AND SAMPLING GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  18. Group sequential designs for stepped-wedge cluster randomised trials

    PubMed Central

    Grayling, Michael J; Wason, James MS; Mander, Adrian P

    2017-01-01

    Background/Aims: The stepped-wedge cluster randomised trial design has received substantial attention in recent years. Although various extensions to the original design have been proposed, no guidance is available on the design of stepped-wedge cluster randomised trials with interim analyses. In an individually randomised trial setting, group sequential methods can provide notable efficiency gains and ethical benefits. We address this by discussing how established group sequential methodology can be adapted for stepped-wedge designs. Methods: Utilising the error spending approach to group sequential trial design, we detail the assumptions required for the determination of stepped-wedge cluster randomised trials with interim analyses. We consider early stopping for efficacy, futility, or efficacy and futility. We describe first how this can be done for any specified linear mixed model for data analysis. We then focus on one particular commonly utilised model and, using a recently completed stepped-wedge cluster randomised trial, compare the performance of several designs with interim analyses to the classical stepped-wedge design. Finally, the performance of a quantile substitution procedure for dealing with the case of unknown variance is explored. Results: We demonstrate that the incorporation of early stopping in stepped-wedge cluster randomised trial designs could reduce the expected sample size under the null and alternative hypotheses by up to 31% and 22%, respectively, with no cost to the trial’s type-I and type-II error rates. The use of restricted error maximum likelihood estimation was found to be more important than quantile substitution for controlling the type-I error rate. Conclusion: The addition of interim analyses into stepped-wedge cluster randomised trials could help guard against time-consuming trials conducted on poor performing treatments and also help expedite the implementation of efficacious treatments. In future, trialists should consider incorporating early stopping of some kind into stepped-wedge cluster randomised trials according to the needs of the particular trial. PMID:28653550

  19. Group sequential designs for stepped-wedge cluster randomised trials.

    PubMed

    Grayling, Michael J; Wason, James Ms; Mander, Adrian P

    2017-10-01

    The stepped-wedge cluster randomised trial design has received substantial attention in recent years. Although various extensions to the original design have been proposed, no guidance is available on the design of stepped-wedge cluster randomised trials with interim analyses. In an individually randomised trial setting, group sequential methods can provide notable efficiency gains and ethical benefits. We address this by discussing how established group sequential methodology can be adapted for stepped-wedge designs. Utilising the error spending approach to group sequential trial design, we detail the assumptions required for the determination of stepped-wedge cluster randomised trials with interim analyses. We consider early stopping for efficacy, futility, or efficacy and futility. We describe first how this can be done for any specified linear mixed model for data analysis. We then focus on one particular commonly utilised model and, using a recently completed stepped-wedge cluster randomised trial, compare the performance of several designs with interim analyses to the classical stepped-wedge design. Finally, the performance of a quantile substitution procedure for dealing with the case of unknown variance is explored. We demonstrate that the incorporation of early stopping in stepped-wedge cluster randomised trial designs could reduce the expected sample size under the null and alternative hypotheses by up to 31% and 22%, respectively, with no cost to the trial's type-I and type-II error rates. The use of restricted error maximum likelihood estimation was found to be more important than quantile substitution for controlling the type-I error rate. The addition of interim analyses into stepped-wedge cluster randomised trials could help guard against time-consuming trials conducted on poor performing treatments and also help expedite the implementation of efficacious treatments. In future, trialists should consider incorporating early stopping of some kind into stepped-wedge cluster randomised trials according to the needs of the particular trial.

  20. Space transfer vehicle concepts and requirements study. Volume 3, book 1: Program cost estimates

    NASA Technical Reports Server (NTRS)

    Peffley, Al F.

    1991-01-01

    The Space Transfer Vehicle (STV) Concepts and Requirements Study cost estimate and program planning analysis is presented. The cost estimating technique used to support STV system, subsystem, and component cost analysis is a mixture of parametric cost estimating and selective cost analogy approaches. The parametric cost analysis is aimed at developing cost-effective aerobrake, crew module, tank module, and lander designs with the parametric cost estimates data. This is accomplished using cost as a design parameter in an iterative process with conceptual design input information. The parametric estimating approach segregates costs by major program life cycle phase (development, production, integration, and launch support). These phases are further broken out into major hardware subsystems, software functions, and tasks according to the STV preliminary program work breakdown structure (WBS). The WBS is defined to a low enough level of detail by the study team to highlight STV system cost drivers. This level of cost visibility provided the basis for cost sensitivity analysis against various design approaches aimed at achieving a cost-effective design. The cost approach, methodology, and rationale are described. A chronological record of the interim review material relating to cost analysis is included along with a brief summary of the study contract tasks accomplished during that period of review and the key conclusions or observations identified that relate to STV program cost estimates. The STV life cycle costs are estimated on the proprietary parametric cost model (PCM) with inputs organized by a project WBS. Preliminary life cycle schedules are also included.

  1. Re-use of pilot data and interim analysis of pivotal data in MRMC studies: a simulation study

    NASA Astrophysics Data System (ADS)

    Chen, Weijie; Samuelson, Frank; Sahiner, Berkman; Petrick, Nicholas

    2017-03-01

    Novel medical imaging devices are often evaluated with multi-reader multi-case (MRMC) studies in which radiologists read images of patient cases for a specified clinical task (e.g., cancer detection). A pilot study is often used to measure the effect size and variance parameters that are necessary for sizing a pivotal study (including sizing readers, non-diseased and diseased cases). Due to the practical difficulty of collecting patient cases or recruiting clinical readers, some investigators attempt to include the pilot data as part of their pivotal study. In other situations, some investigators attempt to perform an interim analysis of their pivotal study data based upon which the sample sizes may be re-estimated. Re-use of the pilot data or interim analyses of the pivotal data may inflate the type I error of the pivotal study. In this work, we use the Roe and Metz model to simulate MRMC data under the null hypothesis (i.e., two devices have equal diagnostic performance) and investigate the type I error rate for several practical designs involving re-use of pilot data or interim analysis of pivotal data. Our preliminary simulation results indicate that, under the simulation conditions we investigated, the inflation of type I error is none or only marginal for some design strategies (e.g., re-use of patient data without re-using readers, and size re-estimation without using the effect-size estimated in the interim analysis). Upon further verifications, these are potentially useful design methods in that they may help make a study less burdensome and have a better chance to succeed without substantial loss of the statistical rigor.

  2. Optimal Futility Interim Design: A Predictive Probability of Success Approach with Time-to-Event Endpoint.

    PubMed

    Tang, Zhongwen

    2015-01-01

    An analytical way to compute predictive probability of success (PPOS) together with credible interval at interim analysis (IA) is developed for big clinical trials with time-to-event endpoints. The method takes account of the fixed data up to IA, the amount of uncertainty in future data, and uncertainty about parameters. Predictive power is a special type of PPOS. The result is confirmed by simulation. An optimal design is proposed by finding optimal combination of analysis time and futility cutoff based on some PPOS criteria.

  3. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    PubMed

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  4. Using phase II data for the analysis of phase III studies: An application in rare diseases.

    PubMed

    Wandel, Simon; Neuenschwander, Beat; Röver, Christian; Friede, Tim

    2017-06-01

    Clinical research and drug development in orphan diseases are challenging, since large-scale randomized studies are difficult to conduct. Formally synthesizing the evidence is therefore of great value, yet this is rarely done in the drug-approval process. Phase III designs that make better use of phase II data can facilitate drug development in orphan diseases. A Bayesian meta-analytic approach is used to inform the phase III study with phase II data. It is particularly attractive, since uncertainty of between-trial heterogeneity can be dealt with probabilistically, which is critical if the number of studies is small. Furthermore, it allows quantifying and discounting the phase II data through the predictive distribution relevant for phase III. A phase III design is proposed which uses the phase II data and considers approval based on a phase III interim analysis. The design is illustrated with a non-inferiority case study from a Food and Drug Administration approval in herpetic keratitis (an orphan disease). Design operating characteristics are compared to those of a traditional design, which ignores the phase II data. An analysis of the phase II data reveals good but insufficient evidence for non-inferiority, highlighting the need for a phase III study. For the phase III study supported by phase II data, the interim analysis is based on half of the patients. For this design, the meta-analytic interim results are conclusive and would justify approval. In contrast, based on the phase III data only, interim results are inconclusive and require further evidence. To accelerate drug development for orphan diseases, innovative study designs and appropriate methodology are needed. Taking advantage of randomized phase II data when analyzing phase III studies looks promising because the evidence from phase II supports informed decision-making. The implementation of the Bayesian design is straightforward with public software such as R.

  5. National Home Start Evaluation Interim Report VII. Twenty-Month Program Analysis and Findings.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This interim evaluation report focuses on process (formative) and outcome (summative) data collected in spring 1975 on the National Home Start Program. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with…

  6. CCSS Literacy and Math Tools: An Interim Report on Implementation and Sustainability during the Pilot Year

    ERIC Educational Resources Information Center

    Reumann-Moore, Rebecca; Lawrence, Nancy; Sanders, Felicia; Shaw, Kate; Christman, Jolley Bruce

    2011-01-01

    This document summarizes the findings from the initial round of research on the development and piloting of two types of instructional tools designed to support teachers' integration of the Common Core State Standards (CCSS) in literacy and math. In this interim report, Research for Action (RFA) presents key findings from the first half of the…

  7. Fusion energy

    NASA Astrophysics Data System (ADS)

    1990-09-01

    The main purpose of the International Thermonuclear Experimental Reactor (ITER) is to develop an experimental fusion reactor through the united efforts of many technologically advanced countries. The ITER terms of reference, issued jointly by the European Community, Japan, the USSR, and the United States, call for an integrated international design activity and constitute the basis of current activities. Joint work on ITER is carried out under the auspices of the International Atomic Energy Agency (IAEA), according to the terms of quadripartite agreement reached between the European Community, Japan, the USSR, and the United States. The site for joint technical work sessions is at the Max Planck Institute of Plasma Physics. Garching, Federal Republic of Germany. The ITER activities have two phases: a definition phase performed in 1988 and the present design phase (1989 to 1990). During the definition phase, a set of ITER technical characteristics and supporting research and development (R and D) activities were developed and reported. The present conceptual design phase of ITER lasts until the end of 1990. The objectives of this phase are to develop the design of ITER, perform a safety and environmental analysis, develop site requirements, define future R and D needs, and estimate cost, manpower, and schedule for construction and operation. A final report will be submitted at the end of 1990. This paper summarizes progress in the ITER program during the 1989 design phase.

  8. Interim analyses in 2 x 2 crossover trials.

    PubMed

    Cook, R J

    1995-09-01

    A method is presented for performing interim analyses in long term 2 x 2 crossover trials with serial patient entry. The analyses are based on a linear statistic that combines data from individuals observed for one treatment period with data from individuals observed for both periods. The coefficients in this linear combination can be chosen quite arbitrarily, but we focus on variance-based weights to maximize power for tests regarding direct treatment effects. The type I error rate of this procedure is controlled by utilizing the joint distribution of the linear statistics over analysis stages. Methods for performing power and sample size calculations are indicated. A two-stage sequential design involving simultaneous patient entry and a single between-period interim analysis is considered in detail. The power and average number of measurements required for this design are compared to those of the usual crossover trial. The results indicate that, while there is minimal loss in power relative to the usual crossover design in the absence of differential carry-over effects, the proposed design can have substantially greater power when differential carry-over effects are present. The two-stage crossover design can also lead to more economical studies in terms of the expected number of measurements required, due to the potential for early stopping. Attention is directed toward normally distributed responses.

  9. Interim Stabilization Equipment Essential and Support Drawing Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    KOCH, M.R.

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

  10. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less

  11. Research at ITER towards DEMO: Specific reactor diagnostic studies to be carried out on ITER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krasilnikov, A. V.; Kaschuck, Y. A.; Vershkov, V. A.

    2014-08-21

    In ITER diagnostics will operate in the very hard radiation environment of fusion reactor. Extensive technology studies are carried out during development of the ITER diagnostics and procedures of their calibration and remote handling. Results of these studies and practical application of the developed diagnostics on ITER will provide the direct input to DEMO diagnostic development. The list of DEMO measurement requirements and diagnostics will be determined during ITER experiments on the bases of ITER plasma physics results and success of particular diagnostic application in reactor-like ITER plasma. Majority of ITER diagnostic already passed the conceptual design phase and representmore » the state of the art in fusion plasma diagnostic development. The number of related to DEMO results of ITER diagnostic studies such as design and prototype manufacture of: neutron and γ–ray diagnostics, neutral particle analyzers, optical spectroscopy including first mirror protection and cleaning technics, reflectometry, refractometry, tritium retention measurements etc. are discussed.« less

  12. Research at ITER towards DEMO: Specific reactor diagnostic studies to be carried out on ITER

    NASA Astrophysics Data System (ADS)

    Krasilnikov, A. V.; Kaschuck, Y. A.; Vershkov, V. A.; Petrov, A. A.; Petrov, V. G.; Tugarinov, S. N.

    2014-08-01

    In ITER diagnostics will operate in the very hard radiation environment of fusion reactor. Extensive technology studies are carried out during development of the ITER diagnostics and procedures of their calibration and remote handling. Results of these studies and practical application of the developed diagnostics on ITER will provide the direct input to DEMO diagnostic development. The list of DEMO measurement requirements and diagnostics will be determined during ITER experiments on the bases of ITER plasma physics results and success of particular diagnostic application in reactor-like ITER plasma. Majority of ITER diagnostic already passed the conceptual design phase and represent the state of the art in fusion plasma diagnostic development. The number of related to DEMO results of ITER diagnostic studies such as design and prototype manufacture of: neutron and γ-ray diagnostics, neutral particle analyzers, optical spectroscopy including first mirror protection and cleaning technics, reflectometry, refractometry, tritium retention measurements etc. are discussed.

  13. Interim Service ISDN Satellite (ISIS) hardware experiment development for advanced ISDN satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.

    1992-01-01

    The Interim Service Integrated Service Digital Network (ISDN) Satellite (ISIS) Hardware Experiment Development for Advanced Satellite Designs describes the development of the ISDN Satellite Terminal Adapter (ISTA) capable of translating ISDN protocol traffic into Time Division Multiple Access (TDMA) signals for use by a communications satellite. The ISTA connects the Type 1 Network Termination (NT1) via the U-interface on the line termination side of the CPE to the RS-499 interface for satellite uplink. The same ISTA converts in the opposite direction the RS-499 to U-interface data with a simple switch setting.

  14. Prosthetically guided bone sculpturing for a maxillary complete-arch implant-supported monolithic zirconia fixed prosthesis based on a digital smile design: A clinical report.

    PubMed

    Rojas-Vizcaya, Fernando

    2017-11-01

    A digital smile design was used to create an average smile and to develop a removable interim restoration for an edentulous patient with a high smile line and different bone levels in the maxilla. The interim restoration was used as a guide to perform bone sculpturing to create space for the biological width and to restore a monolithic zirconia implant-supported fixed restoration. Copyright © 2017 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  15. The Iterative Design Process in Research and Development: A Work Experience Paper

    NASA Technical Reports Server (NTRS)

    Sullivan, George F. III

    2013-01-01

    The iterative design process is one of many strategies used in new product development. Top-down development strategies, like waterfall development, place a heavy emphasis on planning and simulation. The iterative process, on the other hand, is better suited to the management of small to medium scale projects. Over the past four months, I have worked with engineers at Johnson Space Center on a multitude of electronics projects. By describing the work I have done these last few months, analyzing the factors that have driven design decisions, and examining the testing and verification process, I will demonstrate that iterative design is the obvious choice for research and development projects.

  16. Quantifying the bias in the estimated treatment effect in randomized trials having interim analyses and a rule for early stopping for futility.

    PubMed

    Walter, S D; Han, H; Briel, M; Guyatt, G H

    2017-04-30

    In this paper, we consider the potential bias in the estimated treatment effect obtained from clinical trials, the protocols of which include the possibility of interim analyses and an early termination of the study for reasons of futility. In particular, by considering the conditional power at an interim analysis, we derive analytic expressions for various parameters of interest: (i) the underestimation or overestimation of the treatment effect in studies that stop for futility; (ii) the impact of the interim analyses on the estimation of treatment effect in studies that are completed, i.e. that do not stop for futility; (iii) the overall estimation bias in the estimated treatment effect in a single study with such a stopping rule; and (iv) the probability of stopping at an interim analysis. We evaluate these general expressions numerically for typical trial scenarios. Results show that the parameters of interest depend on a number of factors, including the true underlying treatment effect, the difference that the trial is designed to detect, the study power, the number of planned interim analyses and what assumption is made about future data to be observed after an interim analysis. Because the probability of stopping early is small for many practical situations, the overall bias is often small, but a more serious issue is the potential for substantial underestimation of the treatment effect in studies that actually stop for futility. We also consider these ideas using data from an illustrative trial that did stop for futility at an interim analysis. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.

  17. Modeling design iteration in product design and development and its solution by a novel artificial bee colony algorithm.

    PubMed

    Chen, Tinggui; Xiao, Renbin

    2014-01-01

    Due to fierce market competition, how to improve product quality and reduce development cost determines the core competitiveness of enterprises. However, design iteration generally causes increases of product cost and delays of development time as well, so how to identify and model couplings among tasks in product design and development has become an important issue for enterprises to settle. In this paper, the shortcomings existing in WTM model are discussed and tearing approach as well as inner iteration method is used to complement the classic WTM model. In addition, the ABC algorithm is also introduced to find out the optimal decoupling schemes. In this paper, firstly, tearing approach and inner iteration method are analyzed for solving coupled sets. Secondly, a hybrid iteration model combining these two technologies is set up. Thirdly, a high-performance swarm intelligence algorithm, artificial bee colony, is adopted to realize problem-solving. Finally, an engineering design of a chemical processing system is given in order to verify its reasonability and effectiveness.

  18. Experiences with an adaptive design for a dose-finding study in patients with osteoarthritis.

    PubMed

    Miller, Frank; Björnsson, Marcus; Svensson, Ola; Karlsten, Rolf

    2014-03-01

    Dose-finding studies in non-oncology areas are usually conducted in Phase II of the development process of a new potential medicine and it is key to choose a good design for such a study, as the results will decide if and how to proceed to Phase III. The present article has focus on the design of a dose-finding study for pain in osteoarthritis patients treated with the TRPV1 antagonist AZD1386. We describe different design alternatives in the planning of this study, the reasoning for choosing the adaptive design and experiences with conduct and interim analysis. Three alternatives were proposed: one single dose-finding study with parallel design, a programme with a smaller Phase IIa study followed by a Phase IIb dose-finding study, and an adaptive dose-finding study. We describe these alternatives in detail and explain why the adaptive design was chosen for the study. We give insights in design aspects of the adaptive study, which need to be pre-planned, like interim decision criteria, statistical analysis method and setup of a Data Monitoring Committee. Based on the interim analysis it was recommended to stop the study for futility since AZD1386 showed no significant pain decrease based on the primary variable. We discuss results and experiences from the conduct of the study with the novel design approach. Huge cost savings have been done compared to if the option with one dose-finding design for Phase II had been chosen. However, we point out several challenges with this approach. Copyright © 2014 Elsevier Inc. All rights reserved.

  19. Soil-cement design study : interim report No. 1.

    DOT National Transportation Integrated Search

    1971-05-01

    Soil-cement base course materials design in Louisiana is based upon durability and compressive strength criteria, with the compressive strength requirements being the controlling factor in 95 percent of the designs. The findings to data have provided...

  20. ITER Construction—Plant System Integration

    NASA Astrophysics Data System (ADS)

    Tada, E.; Matsuda, S.

    2009-02-01

    This brief paper introduces how the ITER will be built in the international collaboration. The ITER Organization plays a central role in constructing ITER and leading it into operation. Since most of the ITER components are to be provided in-kind from the member countries, integral project management should be scoped in advance of real work. Those include design, procurement, system assembly, testing, licensing and commissioning of ITER.

  1. Development of the ITER magnetic diagnostic set and specification.

    PubMed

    Vayakis, G; Arshad, S; Delhom, D; Encheva, A; Giacomin, T; Jones, L; Patel, K M; Pérez-Lasala, M; Portales, M; Prieto, D; Sartori, F; Simrock, S; Snipes, J A; Udintsev, V S; Watts, C; Winter, A; Zabeo, L

    2012-10-01

    ITER magnetic diagnostics are now in their detailed design and R&D phase. They have passed their conceptual design reviews and a working diagnostic specification has been prepared aimed at the ITER project requirements. This paper highlights specific design progress, in particular, for the in-vessel coils, steady state sensors, saddle loops and divertor sensors. Key changes in the measurement specifications, and a working concept of software and electronics are also outlined.

  2. Front-end antenna system design for the ITER low-field-side reflectometer system using GENRAY ray tracing.

    PubMed

    Wang, G; Doyle, E J; Peebles, W A

    2016-11-01

    A monostatic antenna array arrangement has been designed for the microwave front-end of the ITER low-field-side reflectometer (LFSR) system. This paper presents details of the antenna coupling coefficient analyses performed using GENRAY, a 3-D ray tracing code, to evaluate the plasma height accommodation capability of such an antenna array design. Utilizing modeled data for the plasma equilibrium and profiles for the ITER baseline and half-field scenarios, a design study was performed for measurement locations varying from the plasma edge to inside the top of the pedestal. A front-end antenna configuration is recommended for the ITER LFSR system based on the results of this coupling analysis.

  3. Doppler Lidar System Design via Interdisciplinary Design Concept at NASA Langley Research Center - Part III

    NASA Technical Reports Server (NTRS)

    Barnes, Bruce W.; Sessions, Alaric M.; Beyon, Jeffrey; Petway, Larry B.

    2014-01-01

    Optimized designs of the Navigation Doppler Lidar (NDL) instrument for Autonomous Landing Hazard Avoidance Technology (ALHAT) were accomplished via Interdisciplinary Design Concept (IDEC) at NASA Langley Research Center during the summer of 2013. Three branches in the Engineering Directorate and three students were involved in this joint task through the NASA Langley Aerospace Research Summer Scholars (LARSS) Program. The Laser Remote Sensing Branch (LRSB), Mechanical Systems Branch (MSB), and Structural and Thermal Systems Branch (STSB) were engaged to achieve optimal designs through iterative and interactive collaborative design processes. A preliminary design iteration was able to reduce the power consumption, mass, and footprint by removing redundant components and replacing inefficient components with more efficient ones. A second design iteration reduced volume and mass by replacing bulky components with excessive performance with smaller components custom-designed for the power system. The existing power system was analyzed to rank components in terms of inefficiency, power dissipation, footprint and mass. Design considerations and priorities are compared along with the results of each design iteration. Overall power system improvements are summarized for design implementations.

  4. Aerodynamic optimization by simultaneously updating flow variables and design parameters

    NASA Technical Reports Server (NTRS)

    Rizk, M. H.

    1990-01-01

    The application of conventional optimization schemes to aerodynamic design problems leads to inner-outer iterative procedures that are very costly. An alternative approach is presented based on the idea of updating the flow variable iterative solutions and the design parameter iterative solutions simultaneously. Two schemes based on this idea are applied to problems of correcting wind tunnel wall interference and optimizing advanced propeller designs. The first of these schemes is applicable to a limited class of two-design-parameter problems with an equality constraint. It requires the computation of a single flow solution. The second scheme is suitable for application to general aerodynamic problems. It requires the computation of several flow solutions in parallel. In both schemes, the design parameters are updated as the iterative flow solutions evolve. Computations are performed to test the schemes' efficiency, accuracy, and sensitivity to variations in the computational parameters.

  5. Multidisciplinary systems optimization by linear decomposition

    NASA Technical Reports Server (NTRS)

    Sobieski, J.

    1984-01-01

    In a typical design process major decisions are made sequentially. An illustrated example is given for an aircraft design in which the aerodynamic shape is usually decided first, then the airframe is sized for strength and so forth. An analogous sequence could be laid out for any other major industrial product, for instance, a ship. The loops in the discipline boxes symbolize iterative design improvements carried out within the confines of a single engineering discipline, or subsystem. The loops spanning several boxes depict multidisciplinary design improvement iterations. Omitted for graphical simplicity is parallelism of the disciplinary subtasks. The parallelism is important in order to develop a broad workfront necessary to shorten the design time. If all the intradisciplinary and interdisciplinary iterations were carried out to convergence, the process could yield a numerically optimal design. However, it usually stops short of that because of time and money limitations. This is especially true for the interdisciplinary iterations.

  6. The role and meaning of interim housing in housing first programs for people experiencing homelessness and mental illness.

    PubMed

    Zerger, Suzanne; Francombe Pridham, Katherine; Jeyaratnam, Jeyagobi; Connelly, Jolynn; Hwang, Stephen; O'Campo, Patricia; Stergiopoulos, Vicky

    2014-07-01

    The housing first (HF) model for individuals experiencing homelessness and mental illness differs by design from traditional models that require consumers to achieve "housing readiness" by meeting program or treatment prerequisites in transitional housing settings prior to permanent housing placement. Given a growing body of evidence for its favorable outcomes and cost effectiveness, HF is increasingly seen as an alternative to and argument against these traditional programs. As such, it is important that the elements and implementation challenges of the HF model be clearly understood and articulated. This qualitative study explored a largely unexamined aspect of the HF model-the need for and meaning of temporary residential settings (interim housing), a place to stay while waiting to secure permanent housing-using interviews and focus groups with service providers and consumers who experienced interim housing during implementation of HF in a large urban center. Although interim housing may not be necessary for all programs implementing the model, our study revealed numerous reasons and demands for safe, flexible interim housing options, and illustrated how they influence the effectiveness of consumer recovery, continuous service engagement, and housing stability.

  7. An iterative analytical technique for the design of interplanetary direct transfer trajectories including perturbations

    NASA Astrophysics Data System (ADS)

    Parvathi, S. P.; Ramanan, R. V.

    2018-06-01

    An iterative analytical trajectory design technique that includes perturbations in the departure phase of the interplanetary orbiter missions is proposed. The perturbations such as non-spherical gravity of Earth and the third body perturbations due to Sun and Moon are included in the analytical design process. In the design process, first the design is obtained using the iterative patched conic technique without including the perturbations and then modified to include the perturbations. The modification is based on, (i) backward analytical propagation of the state vector obtained from the iterative patched conic technique at the sphere of influence by including the perturbations, and (ii) quantification of deviations in the orbital elements at periapsis of the departure hyperbolic orbit. The orbital elements at the sphere of influence are changed to nullify the deviations at the periapsis. The analytical backward propagation is carried out using the linear approximation technique. The new analytical design technique, named as biased iterative patched conic technique, does not depend upon numerical integration and all computations are carried out using closed form expressions. The improved design is very close to the numerical design. The design analysis using the proposed technique provides a realistic insight into the mission aspects. Also, the proposed design is an excellent initial guess for numerical refinement and helps arrive at the four distinct design options for a given opportunity.

  8. Adaptive design clinical trials: a review of the literature and ClinicalTrials.gov

    PubMed Central

    Bothwell, Laura E; Avorn, Jerry; Khan, Nazleen F; Kesselheim, Aaron S

    2018-01-01

    Objectives This review investigates characteristics of implemented adaptive design clinical trials and provides examples of regulatory experience with such trials. Design Review of adaptive design clinical trials in EMBASE, PubMed, Cochrane Registry of Controlled Clinical Trials, Web of Science and ClinicalTrials.gov. Phase I and seamless Phase I/II trials were excluded. Variables extracted from trials included basic study characteristics, adaptive design features, size and use of independent data monitoring committees (DMCs) and blinded interim analyses. We also examined use of the adaptive trials in new drug submissions to the Food and Drug Administration (FDA) and European Medicines Agency (EMA) and recorded regulators’ experiences with adaptive designs. Results 142 studies met inclusion criteria. There has been a recent growth in publicly reported use of adaptive designs among researchers around the world. The most frequently appearing types of adaptations were seamless Phase II/III (57%), group sequential (21%), biomarker adaptive (20%), and adaptive dose-finding designs (16%). About one-third (32%) of trials reported an independent DMC, while 6% reported blinded interim analysis. We found that 9% of adaptive trials were used for FDA product approval consideration, and 12% were used for EMA product approval consideration. International regulators had mixed experiences with adaptive trials. Many product applications with adaptive trials had extensive correspondence between drug sponsors and regulators regarding the adaptive designs, in some cases with regulators requiring revisions or alterations to research designs. Conclusions Wider use of adaptive designs will necessitate new drug application sponsors to engage with regulatory scientists during planning and conduct of the trials. Investigators need to more consistently report protections intended to preserve confidentiality and minimise potential operational bias during interim analysis. PMID:29440155

  9. Exploring the statistical and clinical impact of two interim analyses on the Phase II design with option for direct assignment.

    PubMed

    An, Ming-Wen; Mandrekar, Sumithra J; Edelman, Martin J; Sargent, Daniel J

    2014-07-01

    The primary goal of Phase II clinical trials is to understand better a treatment's safety and efficacy to inform a Phase III go/no-go decision. Many Phase II designs have been proposed, incorporating randomization, interim analyses, adaptation, and patient selection. The Phase II design with an option for direct assignment (i.e. stop randomization and assign all patients to the experimental arm based on a single interim analysis (IA) at 50% accrual) was recently proposed [An et al., 2012]. We discuss this design in the context of existing designs, and extend it from a single-IA to a two-IA design. We compared the statistical properties and clinical relevance of the direct assignment design with two IA (DAD-2) versus a balanced randomized design with two IA (BRD-2) and a direct assignment design with one IA (DAD-1), over a range of response rate ratios (2.0-3.0). The DAD-2 has minimal loss in power (<2.2%) and minimal increase in T1ER (<1.6%) compared to a BRD-2. As many as 80% more patients were treated with experimental vs. control in the DAD-2 than with the BRD-2 (experimental vs. control ratio: 1.8 vs. 1.0), and as many as 64% more in the DAD-2 than with the DAD-1 (1.8 vs. 1.1). We illustrate the DAD-2 using a case study in lung cancer. In the spectrum of Phase II designs, the direct assignment design, especially with two IA, provides a middle ground with desirable statistical properties and likely appeal to both clinicians and patients. Copyright © 2014 Elsevier Inc. All rights reserved.

  10. Design Optimization Programmable Calculators versus Campus Computers.

    ERIC Educational Resources Information Center

    Savage, Michael

    1982-01-01

    A hypothetical design optimization problem and technical information on the three design parameters are presented. Although this nested iteration problem can be solved on a computer (flow diagram provided), this article suggests that several hand held calculators can be used to perform the same design iteration. (SK)

  11. Railroad classification yard design methodology study Elkhart Yard Rehabilitation : a case study

    DOT National Transportation Integrated Search

    1980-02-01

    This interim report documents the application of a railroad classification : yard design methodology to CONRAIL's Elkhart Yard Rehabilitation. This : case study effort represents Phase 2 of a larger effort to develop a yard : design methodology, and ...

  12. Modeling Design Iteration in Product Design and Development and Its Solution by a Novel Artificial Bee Colony Algorithm

    PubMed Central

    2014-01-01

    Due to fierce market competition, how to improve product quality and reduce development cost determines the core competitiveness of enterprises. However, design iteration generally causes increases of product cost and delays of development time as well, so how to identify and model couplings among tasks in product design and development has become an important issue for enterprises to settle. In this paper, the shortcomings existing in WTM model are discussed and tearing approach as well as inner iteration method is used to complement the classic WTM model. In addition, the ABC algorithm is also introduced to find out the optimal decoupling schemes. In this paper, firstly, tearing approach and inner iteration method are analyzed for solving coupled sets. Secondly, a hybrid iteration model combining these two technologies is set up. Thirdly, a high-performance swarm intelligence algorithm, artificial bee colony, is adopted to realize problem-solving. Finally, an engineering design of a chemical processing system is given in order to verify its reasonability and effectiveness. PMID:25431584

  13. Interim analysis: A rational approach of decision making in clinical trial.

    PubMed

    Kumar, Amal; Chakraborty, Bhaswat S

    2016-01-01

    Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  14. Iteration in Early-Elementary Engineering Design

    NASA Astrophysics Data System (ADS)

    McFarland Kendall, Amber Leigh

    K-12 standards and curricula are beginning to include engineering design as a key practice within Science Technology Engineering and Mathematics (STEM) education. However, there is little research on how the youngest students engage in engineering design within the elementary classroom. This dissertation focuses on iteration as an essential aspect of engineering design, and because research at the college and professional level suggests iteration improves the designer's understanding of problems and the quality of design solutions. My research presents qualitative case studies of students in kindergarten and third-grade as they engage in classroom engineering design challenges which integrate with traditional curricula standards in mathematics, science, and literature. I discuss my results through the lens of activity theory, emphasizing practices, goals, and mediating resources. Through three chapters, I provide insight into how early-elementary students iterate upon their designs by characterizing the ways in which lesson design impacts testing and revision, by analyzing the plan-driven and experimentation-driven approaches that student groups use when solving engineering design challenges, and by investigating how students attend to constraints within the challenge. I connect these findings to teacher practices and curriculum design in order to suggest methods of promoting iteration within open-ended, classroom-based engineering design challenges. This dissertation contributes to the field of engineering education by providing evidence of productive engineering practices in young students and support for the value of engineering design challenges in developing students' participation and agency in these practices.

  15. The Design Implementation Framework: Iterative Design from the Lab to the Classroom

    ERIC Educational Resources Information Center

    Stone, Melissa L.; Kent, Kevin M.; Roscoe, Rod D.; Corley, Kathleen M.; Allen, Laura K.; McNamara, Danielle S.

    2017-01-01

    This chapter explores three broad principles of user-centered design methodologies: participatory design, iteration, and usability considerations. The authors highlight the importance of considering teachers as a prominent type of ITS end user, by describing the barriers teachers face as users and their role in educational technology design. To…

  16. Progress in the Design and Development of the ITER Low-Field Side Reflectometer (LFSR) System

    NASA Astrophysics Data System (ADS)

    Doyle, E. J.; Wang, G.; Peebles, W. A.; US LFSR Team

    2015-11-01

    The US has formed a team, comprised of personnel from PPPL, ORNL, GA and UCLA, to develop the LFSR system for ITER. The LFSR system will contribute to the measurement of a number of plasma parameters on ITER, including edge plasma electron density profiles, monitor Edge Localized Modes (ELMs) and L-H transitions, and provide physics measurements relating to high frequency instabilities, plasma flows, and other density transients. An overview of the status of design activities and component testing for the system will be presented. Since the 2011 conceptual design review, the number of microwave transmission lines (TLs) and antennas has been reduced from twelve (12) to seven (7) due to space constraint in the ITER Tokamak Port Plug. This change has required a reconfiguration and recalculation of the performance of the front-end antenna design, which now includes use of monostatic transmission lines and antennas. Work supported by US ITER/PPPL Subcontracts S013252-C and S012340, and PO 4500051400 from GA to UCLA.

  17. ITER ECE Diagnostic: Design Progress of IN-DA and the diagnostic role for Physics

    NASA Astrophysics Data System (ADS)

    Pandya, H. K. B.; Kumar, Ravinder; Danani, S.; Shrishail, P.; Thomas, Sajal; Kumar, Vinay; Taylor, G.; Khodak, A.; Rowan, W. L.; Houshmandyar, S.; Udintsev, V. S.; Casal, N.; Walsh, M. J.

    2017-04-01

    The ECE Diagnostic system in ITER will be used for measuring the electron temperature profile evolution, electron temperature fluctuations, the runaway electron spectrum, and the radiated power in the electron cyclotron frequency range (70-1000 GHz), These measurements will be used for advanced real time plasma control (e.g. steering the electron cyclotron heating beams), and physics studies. The scope of the Indian Domestic Agency (IN-DA) is to design and develop the polarizer splitter units; the broadband (70 to 1000 GHz) transmission lines; a high temperature calibration source in the Diagnostics Hall; two Michelson Interferometers (70 to 1000 GHz) and a 122-230 GHz radiometer. The remainder of the ITER ECE diagnostic system is the responsibility of the US domestic agency and the ITER Organization (IO). The design needs to conform to the ITER Organization’s strict requirements for reliability, availability, maintainability and inspect-ability. Progress in the design and development of various subsystems and components considering various engineering challenges and solutions will be discussed in this paper. This paper will also highlight how various ECE measurements can enhance understanding of plasma physics in ITER.

  18. Improving Access to Care for Warfighters: Virtual Worlds Technology to Enhance Primary Care Training in Post-Traumatic Stress and Motivational Interviewing

    DTIC Science & Technology

    2017-10-01

    chronic mental and physical health problems. Therefore, the project aims to: (1) iteratively design a new web-based PTS and Motivational Interviewing...result in missed opportunities to intervene to prevent chronic mental and physical health problems. The project aims are to: (1) iteratively design a new...intervene to prevent chronic mental and physical health problems. We propose to: (1) Iteratively design a new web-based PTS and Motivational

  19. 75 FR 54527 - Defense Federal Acquisition Regulation Supplement; Government Rights in the Design of DoD Vessels...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... Defense Authorization Act for Fiscal Year 2009 and the Vessel Hull Design Protection Amendments of 2008...) and the Vessel Hull Design Protection Amendments of 2008 (Pub. L. 110-434). DoD published the interim...

  20. Railroad classification yard design methodology study : East Deerfield Yard, a case study

    DOT National Transportation Integrated Search

    1980-02-01

    This interim report documents the application of a railroad classification yard design methodology to Boston and Maine's East Deerfield Yard Rehabiliation. This case study effort represents Phase 2 of a larger effort to develop a yard design methodol...

  1. 77 FR 65855 - Cancellation of Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... DEPARTMENT OF AGRICULTURE Grain Inspection, Packers and Stockyards Administration Cancellation of Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of Interim Provider; Opportunity for Designation in the Indianapolis, IN Area AGENCY: Grain Inspection, Packers and Stockyards...

  2. Conditional estimation using prior information in 2-stage group sequential designs assuming asymptotic normality when the trial terminated early.

    PubMed

    Shimura, Masashi; Maruo, Kazushi; Gosho, Masahiko

    2018-04-23

    Two-stage designs are widely used to determine whether a clinical trial should be terminated early. In such trials, a maximum likelihood estimate is often adopted to describe the difference in efficacy between the experimental and reference treatments; however, this method is known to display conditional bias. To reduce such bias, a conditional mean-adjusted estimator (CMAE) has been proposed, although the remaining bias may be nonnegligible when a trial is stopped for efficacy at the interim analysis. We propose a new estimator for adjusting the conditional bias of the treatment effect by extending the idea of the CMAE. This estimator is calculated by weighting the maximum likelihood estimate obtained at the interim analysis and the effect size prespecified when calculating the sample size. We evaluate the performance of the proposed estimator through analytical and simulation studies in various settings in which a trial is stopped for efficacy or futility at the interim analysis. We find that the conditional bias of the proposed estimator is smaller than that of the CMAE when the information time at the interim analysis is small. In addition, the mean-squared error of the proposed estimator is also smaller than that of the CMAE. In conclusion, we recommend the use of the proposed estimator for trials that are terminated early for efficacy or futility. Copyright © 2018 John Wiley & Sons, Ltd.

  3. Tolerable movement criteria for highway bridges, volume I : interim report.

    DOT National Transportation Integrated Search

    1982-09-01

    "The design procedure presented considers both strength and serviceability criteria. The procedure involves designing a bridge assuming no settlement will take place, using the American Association of State Highway and Transportation Officials workin...

  4. On the safety of ITER accelerators.

    PubMed

    Li, Ge

    2013-01-01

    Three 1 MV/40A accelerators in heating neutral beams (HNB) are on track to be implemented in the International Thermonuclear Experimental Reactor (ITER). ITER may produce 500 MWt of power by 2026 and may serve as a green energy roadmap for the world. They will generate -1 MV 1 h long-pulse ion beams to be neutralised for plasma heating. Due to frequently occurring vacuum sparking in the accelerators, the snubbers are used to limit the fault arc current to improve ITER safety. However, recent analyses of its reference design have raised concerns. General nonlinear transformer theory is developed for the snubber to unify the former snubbers' different design models with a clear mechanism. Satisfactory agreement between theory and tests indicates that scaling up to a 1 MV voltage may be possible. These results confirm the nonlinear process behind transformer theory and map out a reliable snubber design for a safer ITER.

  5. On the safety of ITER accelerators

    PubMed Central

    Li, Ge

    2013-01-01

    Three 1 MV/40A accelerators in heating neutral beams (HNB) are on track to be implemented in the International Thermonuclear Experimental Reactor (ITER). ITER may produce 500 MWt of power by 2026 and may serve as a green energy roadmap for the world. They will generate −1 MV 1 h long-pulse ion beams to be neutralised for plasma heating. Due to frequently occurring vacuum sparking in the accelerators, the snubbers are used to limit the fault arc current to improve ITER safety. However, recent analyses of its reference design have raised concerns. General nonlinear transformer theory is developed for the snubber to unify the former snubbers' different design models with a clear mechanism. Satisfactory agreement between theory and tests indicates that scaling up to a 1 MV voltage may be possible. These results confirm the nonlinear process behind transformer theory and map out a reliable snubber design for a safer ITER. PMID:24008267

  6. Gaussian beam and physical optics iteration technique for wideband beam waveguide feed design

    NASA Technical Reports Server (NTRS)

    Veruttipong, W.; Chen, J. C.; Bathker, D. A.

    1991-01-01

    The Gaussian beam technique has become increasingly popular for wideband beam waveguide (BWG) design. However, it is observed that the Gaussian solution is less accurate for smaller mirrors (approximately less than 30 lambda in diameter). Therefore, a high-performance wideband BWG design cannot be achieved by using the Gaussian beam technique alone. This article demonstrates a new design approach by iterating Gaussian beam and BWG parameters simultaneously at various frequencies to obtain a wideband BWG. The result is further improved by comparing it with physical optics results and repeating the iteration.

  7. Development and Evaluation of an Intuitive Operations Planning Process

    DTIC Science & Technology

    2006-03-01

    designed to be iterative and also prescribes the way in which iterations should occur. On the other hand, participants’ perceived level of trust and...16 4. DESIGN AND METHOD OF THE EXPERIMENTAL EVALUATION OF THE INTUITIVE PLANNING PROCESS...20 4.1.3 Design

  8. Iterative optimization method for design of quantitative magnetization transfer imaging experiments.

    PubMed

    Levesque, Ives R; Sled, John G; Pike, G Bruce

    2011-09-01

    Quantitative magnetization transfer imaging (QMTI) using spoiled gradient echo sequences with pulsed off-resonance saturation can be a time-consuming technique. A method is presented for selection of an optimum experimental design for quantitative magnetization transfer imaging based on the iterative reduction of a discrete sampling of the Z-spectrum. The applicability of the technique is demonstrated for human brain white matter imaging at 1.5 T and 3 T, and optimal designs are produced to target specific model parameters. The optimal number of measurements and the signal-to-noise ratio required for stable parameter estimation are also investigated. In vivo imaging results demonstrate that this optimal design approach substantially improves parameter map quality. The iterative method presented here provides an advantage over free form optimal design methods, in that pragmatic design constraints are readily incorporated. In particular, the presented method avoids clustering and repeated measures in the final experimental design, an attractive feature for the purpose of magnetization transfer model validation. The iterative optimal design technique is general and can be applied to any method of quantitative magnetization transfer imaging. Copyright © 2011 Wiley-Liss, Inc.

  9. 77 FR 66578 - Cancellation of Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of Interim Provider; Opportunity for Designation in the Indianapolis, IN Area; Correction AGENCY: Grain Inspection, Packers and Stockyards Administration, USDA. ACTION: Notice; correction. SUMMARY: The USDA, Grain Inspection, Packers and...

  10. Interim Service ISDN Satellite (ISIS) simulator development for advanced satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.

    1992-01-01

    The simulation development associated with the network models of both the Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) and the Full Service ISDN Satellite (FSIS) architectures is documented. The ISIS Network Model design represents satellite systems like the Advanced Communications Technology Satellite (ACTS) orbiting switch. The FSIS architecture, the ultimate aim of this element of the Satellite Communications Applications Research (SCAR) Program, moves all control and switching functions on-board the next generation ISDN communications satellite. The technical and operational parameters for the advanced ISDN communications satellite design will be obtained from the simulation of ISIS and FSIS engineering software models for their major subsystems. Discrete event simulation experiments will be performed with these models using various traffic scenarios, design parameters, and operational procedures. The data from these simulations will be used to determine the engineering parameters for the advanced ISDN communications satellite.

  11. A Procedure for Structural Weight Estimation of Single Stage to Orbit Launch Vehicles (Interim User's Manual)

    NASA Technical Reports Server (NTRS)

    Martinovic, Zoran N.; Cerro, Jeffrey A.

    2002-01-01

    This is an interim user's manual for current procedures used in the Vehicle Analysis Branch at NASA Langley Research Center, Hampton, Virginia, for launch vehicle structural subsystem weight estimation based on finite element modeling and structural analysis. The process is intended to complement traditional methods of conceptual and early preliminary structural design such as the application of empirical weight estimation or application of classical engineering design equations and criteria on one dimensional "line" models. Functions of two commercially available software codes are coupled together. Vehicle modeling and analysis are done using SDRC/I-DEAS, and structural sizing is performed with the Collier Research Corp. HyperSizer program.

  12. Statistical aspects of the TNK-S2B trial of tenecteplase versus alteplase in acute ischemic stroke: an efficient, dose-adaptive, seamless phase II/III design.

    PubMed

    Levin, Bruce; Thompson, John L P; Chakraborty, Bibhas; Levy, Gilberto; MacArthur, Robert; Haley, E Clarke

    2011-08-01

    TNK-S2B, an innovative, randomized, seamless phase II/III trial of tenecteplase versus rt-PA for acute ischemic stroke, terminated for slow enrollment before regulatory approval of use of phase II patients in phase III. (1) To review the trial design and comprehensive type I error rate simulations and (2) to discuss issues raised during regulatory review, to facilitate future approval of similar designs. In phase II, an early (24-h) outcome and adaptive sequential procedure selected one of three tenecteplase doses for phase III comparison with rt-PA. Decision rules comparing this dose to rt-PA would cause stopping for futility at phase II end, or continuation to phase III. Phase III incorporated two co-primary hypotheses, allowing for a treatment effect at either end of the trichotomized Rankin scale. Assuming no early termination, four interim analyses and one final analysis of 1908 patients provided an experiment-wise type I error rate of <0.05. Over 1,000 distribution scenarios, each involving 40,000 replications, the maximum type I error in phase III was 0.038. Inflation from the dose selection was more than offset by the one-half continuity correction in the test statistics. Inflation from repeated interim analyses was more than offset by the reduction from the clinical stopping rules for futility at the first interim analysis. Design complexity and evolving regulatory requirements lengthened the review process. (1) The design was innovative and efficient. Per protocol, type I error was well controlled for the co-primary phase III hypothesis tests, and experiment-wise. (2a) Time must be allowed for communications with regulatory reviewers from first design stages. (2b) Adequate type I error control must be demonstrated. (2c) Greater clarity is needed on (i) whether this includes demonstration of type I error control if the protocol is violated and (ii) whether simulations of type I error control are acceptable. (2d) Regulatory agency concerns that protocols for futility stopping may not be followed may be allayed by submitting interim analysis results to them as these analyses occur.

  13. The development of an interim generalized gate logic software simulator

    NASA Technical Reports Server (NTRS)

    Mcgough, J. G.; Nemeroff, S.

    1985-01-01

    A proof-of-concept computer program called IGGLOSS (Interim Generalized Gate Logic Software Simulator) was developed and is discussed. The simulator engine was designed to perform stochastic estimation of self test coverage (fault-detection latency times) of digital computers or systems. A major attribute of the IGGLOSS is its high-speed simulation: 9.5 x 1,000,000 gates/cpu sec for nonfaulted circuits and 4.4 x 1,000,000 gates/cpu sec for faulted circuits on a VAX 11/780 host computer.

  14. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    PubMed

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (P<.001). At the facial margin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (P<.001). However, the mean percentage dye penetration was significantly correlated with the vertical and horizontal marginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (P<.01 in each instance). A significantly smaller vertical marginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns; however, this difference was not observed for the horizontal component. The percentage dye penetration was correlated with vertical and horizontal discrepancies at the facial surface for the Jet interim crowns and with horizontal discrepancies at the lingual surface for the Caulk interim crowns. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  15. Locomotive cab design development. volume III: design application analysis - Interim report

    DOT National Transportation Integrated Search

    1976-10-01

    In Volume II of this service of reports on Locomotive Cab Design Development, changes were recommended in the layout and equipment content of locomotive cabs. This report studies the impact of these changes on the interface of the cab with the rest o...

  16. ITER Central Solenoid Module Fabrication

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, John

    The fabrication of the modules for the ITER Central Solenoid (CS) has started in a dedicated production facility located in Poway, California, USA. The necessary tools have been designed, built, installed, and tested in the facility to enable the start of production. The current schedule has first module fabrication completed in 2017, followed by testing and subsequent shipment to ITER. The Central Solenoid is a key component of the ITER tokamak providing the inductive voltage to initiate and sustain the plasma current and to position and shape the plasma. The design of the CS has been a collaborative effort betweenmore » the US ITER Project Office (US ITER), the international ITER Organization (IO) and General Atomics (GA). GA’s responsibility includes: completing the fabrication design, developing and qualifying the fabrication processes and tools, and then completing the fabrication of the seven 110 tonne CS modules. The modules will be shipped separately to the ITER site, and then stacked and aligned in the Assembly Hall prior to insertion in the core of the ITER tokamak. A dedicated facility in Poway, California, USA has been established by GA to complete the fabrication of the seven modules. Infrastructure improvements included thick reinforced concrete floors, a diesel generator for backup power, along with, cranes for moving the tooling within the facility. The fabrication process for a single module requires approximately 22 months followed by five months of testing, which includes preliminary electrical testing followed by high current (48.5 kA) tests at 4.7K. The production of the seven modules is completed in a parallel fashion through ten process stations. The process stations have been designed and built with most stations having completed testing and qualification for carrying out the required fabrication processes. The final qualification step for each process station is achieved by the successful production of a prototype coil. Fabrication of the first ITER module is in progress. The seven modules will be individually shipped to Cadarache, France upon their completion. This paper describes the processes and status of the fabrication of the CS Modules for ITER.« less

  17. Adaptive graph-based multiple testing procedures

    PubMed Central

    Klinglmueller, Florian; Posch, Martin; Koenig, Franz

    2016-01-01

    Multiple testing procedures defined by directed, weighted graphs have recently been proposed as an intuitive visual tool for constructing multiple testing strategies that reflect the often complex contextual relations between hypotheses in clinical trials. Many well-known sequentially rejective tests, such as (parallel) gatekeeping tests or hierarchical testing procedures are special cases of the graph based tests. We generalize these graph-based multiple testing procedures to adaptive trial designs with an interim analysis. These designs permit mid-trial design modifications based on unblinded interim data as well as external information, while providing strong family wise error rate control. To maintain the familywise error rate, it is not required to prespecify the adaption rule in detail. Because the adaptive test does not require knowledge of the multivariate distribution of test statistics, it is applicable in a wide range of scenarios including trials with multiple treatment comparisons, endpoints or subgroups, or combinations thereof. Examples of adaptations are dropping of treatment arms, selection of subpopulations, and sample size reassessment. If, in the interim analysis, it is decided to continue the trial as planned, the adaptive test reduces to the originally planned multiple testing procedure. Only if adaptations are actually implemented, an adjusted test needs to be applied. The procedure is illustrated with a case study and its operating characteristics are investigated by simulations. PMID:25319733

  18. Iteration in Early-Elementary Engineering Design

    ERIC Educational Resources Information Center

    McFarland Kendall, Amber Leigh

    2017-01-01

    K-12 standards and curricula are beginning to include engineering design as a key practice within Science Technology Engineering and Mathematics (STEM) education. However, there is little research on how the youngest students engage in engineering design within the elementary classroom. This dissertation focuses on iteration as an essential aspect…

  19. The use of group sequential, information-based sample size re-estimation in the design of the PRIMO study of chronic kidney disease.

    PubMed

    Pritchett, Yili; Jemiai, Yannis; Chang, Yuchiao; Bhan, Ishir; Agarwal, Rajiv; Zoccali, Carmine; Wanner, Christoph; Lloyd-Jones, Donald; Cannata-Andía, Jorge B; Thompson, Taylor; Appelbaum, Evan; Audhya, Paul; Andress, Dennis; Zhang, Wuyan; Solomon, Scott; Manning, Warren J; Thadhani, Ravi

    2011-04-01

    Chronic kidney disease is associated with a marked increase in risk for left ventricular hypertrophy and cardiovascular mortality compared with the general population. Therapy with vitamin D receptor activators has been linked with reduced mortality in chronic kidney disease and an improvement in left ventricular hypertrophy in animal studies. PRIMO (Paricalcitol capsules benefits in Renal failure Induced cardia MOrbidity) is a multinational, multicenter randomized controlled trial to assess the effects of paricalcitol (a selective vitamin D receptor activator) on mild to moderate left ventricular hypertrophy in patients with chronic kidney disease. Subjects with mild-moderate chronic kidney disease are randomized to paricalcitol or placebo after confirming left ventricular hypertrophy using a cardiac echocardiogram. Cardiac magnetic resonance imaging is then used to assess left ventricular mass index at baseline, 24 and 48 weeks, which is the primary efficacy endpoint of the study. Because of limited prior data to estimate sample size, a maximum information group sequential design with sample size re-estimation is implemented to allow sample size adjustment based on the nuisance parameter estimated using the interim data. An interim efficacy analysis is planned at a pre-specified time point conditioned on the status of enrollment. The decision to increase sample size depends on the observed treatment effect. A repeated measures analysis model, using available data at Week 24 and 48 with a backup model of an ANCOVA analyzing change from baseline to the final nonmissing observation, are pre-specified to evaluate the treatment effect. Gamma-family of spending function is employed to control family-wise Type I error rate as stopping for success is planned in the interim efficacy analysis. If enrollment is slower than anticipated, the smaller sample size used in the interim efficacy analysis and the greater percent of missing week 48 data might decrease the parameter estimation accuracy, either for the nuisance parameter or for the treatment effect, which might in turn affect the interim decision-making. The application of combining a group sequential design with a sample-size re-estimation in clinical trial design has the potential to improve efficiency and to increase the probability of trial success while ensuring integrity of the study.

  20. Implementation of the AASHTO mechanistic-empirical pavement design guide for Colorado.

    DOT National Transportation Integrated Search

    2000-01-01

    The objective of this project was to integrate the American Association of State Highway and Transportation Officials (AASHTO) Mechanistic-Empirical Pavement Design Guide, Interim Edition: A Manual of Practice and its accompanying software into the d...

  1. Calibration of the MEPDG transfer functions in Georgia : task order 2 report.

    DOT National Transportation Integrated Search

    2015-03-28

    The Georgia Department of Transportation (GDOT) currently uses the empirical 1972 AASHTO Interim Guide for : Design of Pavement Structures as their standard pavement design procedure. However, GDOT plans to transition to the : Mechanistic Empirical P...

  2. Thermo-mechanical analysis of ITER first mirrors and its use for the ITER equatorial visible∕infrared wide angle viewing system optical design.

    PubMed

    Joanny, M; Salasca, S; Dapena, M; Cantone, B; Travère, J M; Thellier, C; Fermé, J J; Marot, L; Buravand, O; Perrollaz, G; Zeile, C

    2012-10-01

    ITER first mirrors (FMs), as the first components of most ITER optical diagnostics, will be exposed to high plasma radiation flux and neutron load. To reduce the FMs heating and optical surface deformation induced during ITER operation, the use of relevant materials and cooling system are foreseen. The calculations led on different materials and FMs designs and geometries (100 mm and 200 mm) show that the use of CuCrZr and TZM, and a complex integrated cooling system can limit efficiently the FMs heating and reduce their optical surface deformation under plasma radiation flux and neutron load. These investigations were used to evaluate, for the ITER equatorial port visible∕infrared wide angle viewing system, the impact of the FMs properties change during operation on the instrument main optical performances. The results obtained are presented and discussed.

  3. Performance assessment of the antenna setup for the ITER plasma position reflectometry in-vessel systems.

    PubMed

    Varela, P; Belo, J H; Quental, P B

    2016-11-01

    The design of the in-vessel antennas for the ITER plasma position reflectometry diagnostic is very challenging due to the need to cope both with the space restrictions inside the vacuum vessel and with the high mechanical and thermal loads during ITER operation. Here, we present the work carried out to assess and optimise the design of the antenna. We show that the blanket modules surrounding the antenna strongly modify its characteristics and need to be considered from the early phases of the design. We also show that it is possible to optimise the antenna performance, within the design restrictions.

  4. Novel aspects of plasma control in ITER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Humphreys, D.; Jackson, G.; Walker, M.

    2015-02-15

    ITER plasma control design solutions and performance requirements are strongly driven by its nuclear mission, aggressive commissioning constraints, and limited number of operational discharges. In addition, high plasma energy content, heat fluxes, neutron fluxes, and very long pulse operation place novel demands on control performance in many areas ranging from plasma boundary and divertor regulation to plasma kinetics and stability control. Both commissioning and experimental operations schedules provide limited time for tuning of control algorithms relative to operating devices. Although many aspects of the control solutions required by ITER have been well-demonstrated in present devices and even designed satisfactorily formore » ITER application, many elements unique to ITER including various crucial integration issues are presently under development. We describe selected novel aspects of plasma control in ITER, identifying unique parts of the control problem and highlighting some key areas of research remaining. Novel control areas described include control physics understanding (e.g., current profile regulation, tearing mode (TM) suppression), control mathematics (e.g., algorithmic and simulation approaches to high confidence robust performance), and integration solutions (e.g., methods for management of highly subscribed control resources). We identify unique aspects of the ITER TM suppression scheme, which will pulse gyrotrons to drive current within a magnetic island, and turn the drive off following suppression in order to minimize use of auxiliary power and maximize fusion gain. The potential role of active current profile control and approaches to design in ITER are discussed. Issues and approaches to fault handling algorithms are described, along with novel aspects of actuator sharing in ITER.« less

  5. Novel aspects of plasma control in ITER

    DOE PAGES

    Humphreys, David; Ambrosino, G.; de Vries, Peter; ...

    2015-02-12

    ITER plasma control design solutions and performance requirements are strongly driven by its nuclear mission, aggressive commissioning constraints, and limited number of operational discharges. In addition, high plasma energy content, heat fluxes, neutron fluxes, and very long pulse operation place novel demands on control performance in many areas ranging from plasma boundary and divertor regulation to plasma kinetics and stability control. Both commissioning and experimental operations schedules provide limited time for tuning of control algorithms relative to operating devices. Although many aspects of the control solutions required by ITER have been well-demonstrated in present devices and even designed satisfactorily formore » ITER application, many elements unique to ITER including various crucial integration issues are presently under development. We describe selected novel aspects of plasma control in ITER, identifying unique parts of the control problem and highlighting some key areas of research remaining. Novel control areas described include control physics understanding (e.g. current profile regulation, tearing mode suppression (TM)), control mathematics (e.g. algorithmic and simulation approaches to high confidence robust performance), and integration solutions (e.g. methods for management of highly-subscribed control resources). We identify unique aspects of the ITER TM suppression scheme, which will pulse gyrotrons to drive current within a magnetic island, and turn the drive off following suppression in order to minimize use of auxiliary power and maximize fusion gain. The potential role of active current profile control and approaches to design in ITER are discussed. Finally, issues and approaches to fault handling algorithms are described, along with novel aspects of actuator sharing in ITER.« less

  6. Two-dimensional over-all neutronics analysis of the ITER device

    NASA Astrophysics Data System (ADS)

    Zimin, S.; Takatsu, Hideyuki; Mori, Seiji; Seki, Yasushi; Satoh, Satoshi; Tada, Eisuke; Maki, Koichi

    1993-07-01

    The present work attempts to carry out a comprehensive neutronics analysis of the International Thermonuclear Experimental Reactor (ITER) developed during the Conceptual Design Activities (CDA). The two-dimensional cylindrical over-all calculational models of ITER CDA device including the first wall, blanket, shield, vacuum vessel, magnets, cryostat and support structures were developed for this purpose with a help of the DOGII code. Two dimensional DOT 3.5 code with the FUSION-40 nuclear data library was employed for transport calculations of neutron and gamma ray fluxes, tritium breeding ratio (TBR), and nuclear heating in reactor components. The induced activity calculational code CINAC was employed for the calculations of exposure dose rate after reactor shutdown around the ITER CDA device. The two-dimensional over-all calculational model includes the design specifics such as the pebble bed Li2O/Be layered blanket, the thin double wall vacuum vessel, the concrete cryostat integrated with the over-all ITER design, the top maintenance shield plug, the additional ring biological shield placed under the top cryostat lid around the above-mentioned top maintenance shield plug etc. All the above-mentioned design specifics were included in the employed calculational models. Some alternative design options, such as the water-rich shielding blanket instead of lithium-bearing one, the additional biological shield plug at the top zone between the poloidal field (PF) coil No. 5, and the maintenance shield plug, were calculated as well. Much efforts have been focused on analyses of obtained results. These analyses aimed to obtain necessary recommendations on improving the ITER CDA design.

  7. 78 FR 25734 - Notice of Petition for Waiver of Hussmann From the Department of Energy Commercial Refrigerator...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... to provide materially inaccurate comparative data.'' The design characteristics constituting the... inaccurate comparative data'' The design characteristics constituting the grounds for the Interim Waiver... Secretary) to prescribe test procedures that are reasonably designed to produce results that measure energy...

  8. 77 FR 64564 - Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ...-Basis Hurricane and Hurricane Missiles AGENCY: Nuclear Regulatory Commission. ACTION: Proposed interim...-ISG-024, ``Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles....221, ``Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants.'' DATES: Submit...

  9. 75 FR 21695 - Interim Notice of Funding Availability for the Department of Transportation's National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... district plans, and other strategies, including land acquisition, designed to create walkable, mixed-use... million of the available TIGER II funds for the planning, preparation, or design of Eligible Projects... manner that will be sustainable for generations to come. Therefore, for projects designed to enhance...

  10. Predictive design procedures, VESYS users manual : an interim design method for flexible pavements using the VESYS structural subsystem

    DOT National Transportation Integrated Search

    1978-01-01

    This manual has been written to provide the pavement manager and design engineer with a ready reference of procedures to predict the structural responses and hence the integrity of flexible pavements. A pavement section of known geometry is chosen, a...

  11. Color image encryption based on gyrator transform and Arnold transform

    NASA Astrophysics Data System (ADS)

    Sui, Liansheng; Gao, Bo

    2013-06-01

    A color image encryption scheme using gyrator transform and Arnold transform is proposed, which has two security levels. In the first level, the color image is separated into three components: red, green and blue, which are normalized and scrambled using the Arnold transform. The green component is combined with the first random phase mask and transformed to an interim using the gyrator transform. The first random phase mask is generated with the sum of the blue component and a logistic map. Similarly, the red component is combined with the second random phase mask and transformed to three-channel-related data. The second random phase mask is generated with the sum of the phase of the interim and an asymmetrical tent map. In the second level, the three-channel-related data are scrambled again and combined with the third random phase mask generated with the sum of the previous chaotic maps, and then encrypted into a gray scale ciphertext. The encryption result has stationary white noise distribution and camouflage property to some extent. In the process of encryption and decryption, the rotation angle of gyrator transform, the iterative numbers of Arnold transform, the parameters of the chaotic map and generated accompanied phase function serve as encryption keys, and hence enhance the security of the system. Simulation results and security analysis are presented to confirm the security, validity and feasibility of the proposed scheme.

  12. Physics and Engineering Design of the ITER Electron Cyclotron Emission Diagnostic

    NASA Astrophysics Data System (ADS)

    Rowan, W. L.; Austin, M. E.; Houshmandyar, S.; Phillips, P. E.; Beno, J. H.; Ouroua, A.; Weeks, D. A.; Hubbard, A. E.; Stillerman, J. A.; Feder, R. E.; Khodak, A.; Taylor, G.; Pandya, H. K.; Danani, S.; Kumar, R.

    2015-11-01

    Electron temperature (Te) measurements and consequent electron thermal transport inferences will be critical to the non-active phases of ITER operation and will take on added importance during the alpha heating phase. Here, we describe our design for the diagnostic that will measure spatial and temporal profiles of Te using electron cyclotron emission (ECE). Other measurement capability includes high frequency instabilities (e.g. ELMs, NTMs, and TAEs). Since results from TFTR and JET suggest that Thomson Scattering and ECE differ at high Te due to driven non-Maxwellian distributions, non-thermal features of the ITER electron distribution must be documented. The ITER environment presents other challenges including space limitations, vacuum requirements, and very high-neutron-fluence. Plasma control in ITER will require real-time Te. The diagnosic design that evolved from these sometimes-conflicting needs and requirements will be described component by component with special emphasis on the integration to form a single effective diagnostic system. Supported by PPPL/US-DA via subcontract S013464-C to UT Austin.

  13. Evaluation of internal fit of interim crown fabricated with CAD/CAM milling and 3D printing system.

    PubMed

    Lee, Wan-Sun; Lee, Du-Hyeong; Lee, Kyu-Bok

    2017-08-01

    This study is to evaluate the internal fit of the crown manufactured by CAD/CAM milling method and 3D printing method. The master model was fabricated with stainless steel by using CNC machine and the work model was created from the vinyl-polysiloxane impression. After scanning the working model, the design software is used to design the crown. The saved STL file is used on the CAD/CAM milling method and two types of 3D printing method to produce 10 interim crowns per group. Internal discrepancy measurement uses the silicon replica method and the measured data are analyzed with One-way ANOVA to verify the statistic significance. The discrepancy means (standard deviation) of the 3 groups are 171.6 (97.4) µm for the crown manufactured by the milling system and 149.1 (65.9) and 91.1 (36.4) µm, respectively, for the crowns manufactured with the two types of 3D printing system. There was a statistically significant difference and the 3D printing system group showed more outstanding value than the milling system group. The marginal and internal fit of the interim restoration has more outstanding 3D printing method than the CAD/CAM milling method. Therefore, the 3D printing method is considered as applicable for not only the interim restoration production, but also in the dental prosthesis production with a higher level of completion.

  14. Asphaltic concrete overlays of rigid and flexible pavements : interim report No. 1.

    DOT National Transportation Integrated Search

    1977-09-01

    This study evaluated the effect of a given thickness of asphaltic concrete overlay in rehabilitating 53 test sections conforming to the experiment design. This factorial design specified various levels of traffic intensity and overlay thickness for b...

  15. An overview of ITER diagnostics (invited)

    NASA Astrophysics Data System (ADS)

    Young, Kenneth M.; Costley, A. E.; ITER-JCT Home Team; ITER Diagnostics Expert Group

    1997-01-01

    The requirements for plasma measurements for operating and controlling the ITER device have now been determined. Initial criteria for the measurement quality have been set, and the diagnostics that might be expected to achieve these criteria have been chosen. The design of the first set of diagnostics to achieve these goals is now well under way. The design effort is concentrating on the components that interact most strongly with the other ITER systems, particularly the vacuum vessel, blankets, divertor modules, cryostat, and shield wall. The relevant details of the ITER device and facility design and specific examples of diagnostic design to provide the necessary measurements are described. These designs have to take account of the issues associated with very high 14 MeV neutron fluxes and fluences, nuclear heating, high heat loads, and high mechanical forces that can arise during disruptions. The design work is supported by an extensive research and development program, which to date has concentrated on the effects these levels of radiation might cause on diagnostic components. A brief outline of the organization of the diagnostic development program is given.

  16. Experiments on water detritiation and cryogenic distillation at TLK; Impact on ITER fuel cycle subsystems interfaces

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cristescu, I.; Cristescu, I. R.; Doerr, L.

    2008-07-15

    The ITER Isotope Separation System (ISS) and Water Detritiation System (WDS) should be integrated in order to reduce potential chronic tritium emissions from the ISS. This is achieved by routing the top (protium) product from the ISS to a feed point near the bottom end of the WDS Liquid Phase Catalytic Exchange (LPCE) column. This provides an additional barrier against ISS emissions and should mitigate the memory effects due to process parameter fluctuations in the ISS. To support the research activities needed to characterize the performances of various components for WDS and ISS processes under various working conditions and configurationsmore » as needed for ITER design, an experimental facility called TRENTA representative of the ITER WDS and ISS protium separation column, has been commissioned and is in operation at TLK The experimental program on TRENTA facility is conducted to provide the necessary design data related to the relevant ITER operating modes. The operation availability and performances of ISS-WDS have impact on ITER fuel cycle subsystems with consequences on the design integration. The preliminary experimental data on TRENTA facility are presented. (authors)« less

  17. Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance Program: eligibility for Pathway Programs participants. Interim final rule with request for comments.

    PubMed

    2014-01-06

    The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.

  18. Improvements in surface singularity analysis and design methods. [applicable to airfoils

    NASA Technical Reports Server (NTRS)

    Bristow, D. R.

    1979-01-01

    The coupling of the combined source vortex distribution of Green's potential flow function with contemporary numerical techniques is shown to provide accurate, efficient, and stable solutions to subsonic inviscid analysis and design problems for multi-element airfoils. The analysis problem is solved by direct calculation of the surface singularity distribution required to satisfy the flow tangency boundary condition. The design or inverse problem is solved by an iteration process. In this process, the geometry and the associated pressure distribution are iterated until the pressure distribution most nearly corresponding to the prescribed design distribution is obtained. Typically, five iteration cycles are required for convergence. A description of the analysis and design method is presented, along with supporting examples.

  19. Precise Reproduction of Soft Tissue Structure around the Pontic Area Using Computer-Aided Design and Manufacturing.

    PubMed

    Lee, Hyeonjong; Paek, Janghyun; Noh, Kwantae; Kwon, Kung-Rock

    2017-08-21

    Reproducing soft tissue contours around a pontic area is important for the fabrication of an esthetic prosthesis, especially in the anterior area. A gingival model that precisely replicates the soft tissue structure around the pontic area can be easily obtained by taking a pick-up impression of an interim fixed dental prosthesis. After a working cast is fabricated using the customary technique, the pick-up model is superimposed onto the working model for the pontic area using computer-aided design and manufacturing (CAD/CAM). A definitive restoration using this technique would be well adapted to the pontic base, which is formed by the interim prosthesis. © 2017 by the American College of Prosthodontists.

  20. Refractive and relativistic effects on ITER low field side reflectometer design.

    PubMed

    Wang, G; Rhodes, T L; Peebles, W A; Harvey, R W; Budny, R V

    2010-10-01

    The ITER low field side reflectometer faces some unique design challenges, among which are included the effect of relativistic electron temperatures and refraction of probing waves. This paper utilizes GENRAY, a 3D ray tracing code, to investigate these effects. Using a simulated ITER operating scenario, characteristics of the reflected millimeter waves after return to the launch plane are quantified as a function of a range of design parameters, including antenna height, antenna diameter, and antenna radial position. Results for edge/SOL measurement with both O- and X-mode polarizations using proposed antennas are reported.

  1. The role of simulation in the design of a neural network chip

    NASA Technical Reports Server (NTRS)

    Desai, Utpal; Roppel, Thaddeus A.; Padgett, Mary L.

    1993-01-01

    An iterative, simulation-based design procedure for a neural network chip is introduced. For this design procedure, the goal is to produce a chip layout for a neural network in which the weights are determined by transistor gate width-to-length ratios. In a given iteration, the current layout is simulated using the circuit simulator SPICE, and layout adjustments are made based on conventional gradient-decent methods. After the iteration converges, the chip is fabricated. Monte Carlo analysis is used to predict the effect of statistical fabrication process variations on the overall performance of the neural network chip.

  2. Pseudo-time methods for constrained optimization problems governed by PDE

    NASA Technical Reports Server (NTRS)

    Taasan, Shlomo

    1995-01-01

    In this paper we present a novel method for solving optimization problems governed by partial differential equations. Existing methods are gradient information in marching toward the minimum, where the constrained PDE is solved once (sometimes only approximately) per each optimization step. Such methods can be viewed as a marching techniques on the intersection of the state and costate hypersurfaces while improving the residuals of the design equations per each iteration. In contrast, the method presented here march on the design hypersurface and at each iteration improve the residuals of the state and costate equations. The new method is usually much less expensive per iteration step since, in most problems of practical interest, the design equation involves much less unknowns that that of either the state or costate equations. Convergence is shown using energy estimates for the evolution equations governing the iterative process. Numerical tests show that the new method allows the solution of the optimization problem in a cost of solving the analysis problems just a few times, independent of the number of design parameters. The method can be applied using single grid iterations as well as with multigrid solvers.

  3. Achievements in the development of the Water Cooled Solid Breeder Test Blanket Module of Japan to the milestones for installation in ITER

    NASA Astrophysics Data System (ADS)

    Tsuru, Daigo; Tanigawa, Hisashi; Hirose, Takanori; Mohri, Kensuke; Seki, Yohji; Enoeda, Mikio; Ezato, Koichiro; Suzuki, Satoshi; Nishi, Hiroshi; Akiba, Masato

    2009-06-01

    As the primary candidate of ITER Test Blanket Module (TBM) to be tested under the leadership of Japan, a water cooled solid breeder (WCSB) TBM is being developed. This paper shows the recent achievements towards the milestones of ITER TBMs prior to the installation, which consist of design integration in ITER, module qualification and safety assessment. With respect to the design integration, targeting the detailed design final report in 2012, structure designs of the WCSB TBM and the interfacing components (common frame and backside shielding) that are placed in a test port of ITER and the layout of the cooling system are presented. As for the module qualification, a real-scale first wall mock-up fabricated by using the hot isostatic pressing method by structural material of reduced activation martensitic ferritic steel, F82H, and flow and irradiation test of the mock-up are presented. As for safety milestones, the contents of the preliminary safety report in 2008 consisting of source term identification, failure mode and effect analysis (FMEA) and identification of postulated initiating events (PIEs) and safety analyses are presented.

  4. 76 FR 63640 - Public Housing Assessment System (PHAS): Proposed Physical Condition Interim Scoring Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-13

    ... call-for-aid is a system designed to provide elderly residents the opportunity to call for help in the... open. This bars that are change also rewrites designed to open the Level 3 should open. If they...

  5. Nutrient Control Design Manual–State of the Technology Review Report

    EPA Science Inventory

    This EPA document is an interim product in the development of revised design guidance for nitrogen and phosphorus control at municipal WWTPs. This document presents findings from an extensive review of nitrogen and phosphorus control technologies and techniques currently applied...

  6. Locomotive cab design development. volume 2 : operator's manual - Interim Report

    DOT National Transportation Integrated Search

    1976-10-01

    Locomotive Cab 913 designed as a result of Contract DOT-TSC- 913 has been built as a hard mock-up. This Operator's Manual is to familiarize the user with the mock-up. Normal and emergency procedures and cab facilities are described.

  7. Not All Wizards Are from Oz: Iterative Design of Intelligent Learning Environments by Communication Capacity Tapering

    ERIC Educational Resources Information Center

    Mavrikis, Manolis; Gutierrez-Santos, Sergio

    2010-01-01

    This paper presents a methodology for the design of intelligent learning environments. We recognise that in the educational technology field, theory development and system-design should be integrated and rely on an iterative process that addresses: (a) the difficulty to elicit precise, concise, and operationalized knowledge from "experts" and (b)…

  8. From Amorphous to Defined: Balancing the Risks of Spiral Development

    DTIC Science & Technology

    2007-04-30

    630 675 720 765 810 855 900 Time (Week) Work started and active PhIt [Requirements,Iter1] : JavelinCalibration work packages1 1 1 Work started and...active PhIt [Technology,Iter1] : JavelinCalibration work packages2 2 2 Work started and active PhIt [Design,Iter1] : JavelinCalibration work packages3 3 3 3...Work started and active PhIt [Manufacturing,Iter1] : JavelinCalibration work packages4 4 Work started and active PhIt [Use,Iter1] : JavelinCalibration

  9. Progress on ion cyclotron range of frequencies heating physics and technology in support of the International Tokamak Experimental Reactor

    NASA Astrophysics Data System (ADS)

    Wilson, J. R.; Bonoli, P. T.

    2015-02-01

    Ion cyclotron range of frequency (ICRF) heating is foreseen as an integral component of the initial ITER operation. The status of ICRF preparations for ITER and supporting research were updated in the 2007 [Gormezano et al., Nucl. Fusion 47, S285 (2007)] report on the ITER physics basis. In this report, we summarize progress made toward the successful application of ICRF power on ITER since that time. Significant advances have been made in support of the technical design by development of new techniques for arc protection, new algorithms for tuning and matching, carrying out experimental tests of more ITER like antennas and demonstration on mockups that the design assumptions are correct. In addition, new applications of the ICRF system, beyond just bulk heating, have been proposed and explored.

  10. Characterization of the radiation environment for a large-area interim spent-nuclear-fuel storage facility

    NASA Astrophysics Data System (ADS)

    Fortkamp, Jonathan C.

    Current needs in the nuclear industry and movements in the political arena indicate that authorization may soon be given for development of a federal interim storage facility for spent nuclear fuel. The initial stages of the design work have already begun within the Department of Energy and are being reviewed by the Nuclear Regulatory Commission. This dissertation addresses the radiation environment around an interim spent nuclear fuel storage facility. Specifically the dissertation characterizes the radiation dose rates around the facility based on a design basis source term, evaluates the changes in dose due to varying cask spacing configurations, and uses these results to define some applicable health physics principles for the storage facility. Results indicate that dose rates from the facility are due primarily from photons from the spent fuel and Co-60 activation in the fuel assemblies. In the modeled cask system, skyshine was a significant contribution to dose rates at distances from the cask array, but this contribution can be reduced with an alternate cask venting system. With the application of appropriate health physics principles, occupation doses can be easily maintained far below regulatory limits and maintained ALARA.

  11. Conceptual Design of the ITER ECE Diagnostic - An Update

    NASA Astrophysics Data System (ADS)

    Austin, M. E.; Pandya, H. K. B.; Beno, J.; Bryant, A. D.; Danani, S.; Ellis, R. F.; Feder, R.; Hubbard, A. E.; Kumar, S.; Ouroua, A.; Phillips, P. E.; Rowan, W. L.

    2012-09-01

    The ITER ECE diagnostic has recently been through a conceptual design review for the entire system including front end optics, transmission line, and back-end instruments. The basic design of two viewing lines, each with a single ellipsoidal mirror focussing into the plasma near the midplane of the typical operating scenarios is agreed upon. The location and design of the hot calibration source and the design of the shutter that directs its radiation to the transmission line are issues that need further investigation. In light of recent measurements and discussion, the design of the broadband transmission line is being revisited and new options contemplated. For the instruments, current systems for millimeter wave radiometers and broad-band spectrometers will be adequate for ITER, but the option for employing new state-of-the-art techniques will be left open.

  12. Conceptual Design of the ITER Plasma Control System

    NASA Astrophysics Data System (ADS)

    Snipes, J. A.

    2013-10-01

    The conceptual design of the ITER Plasma Control System (PCS) has been approved and the preliminary design has begun for the 1st plasma PCS. This is a collaboration of many plasma control experts from existing devices to design and test plasma control techniques applicable to ITER on existing machines. The conceptual design considered all phases of plasma operation, ranging from non-active H/He plasmas through high fusion gain inductive DT plasmas to fully non-inductive steady-state operation, to ensure that the PCS control functionality and architecture can satisfy the demands of the ITER Research Plan. The PCS will control plasma equilibrium and density, plasma heat exhaust, a range of MHD instabilities (including disruption mitigation), and the non-inductive current profile required to maintain stable steady-state scenarios. The PCS architecture requires sophisticated shared actuator management and event handling systems to prioritize control goals, algorithms, and actuators according to dynamic control needs and monitor plasma and plant system events to trigger automatic changes in the control algorithms or operational scenario, depending on real-time operating limits and conditions.

  13. Description of the prototype diagnostic residual gas analyzer for ITER.

    PubMed

    Younkin, T R; Biewer, T M; Klepper, C C; Marcus, C

    2014-11-01

    The diagnostic residual gas analyzer (DRGA) system to be used during ITER tokamak operation is being designed at Oak Ridge National Laboratory to measure fuel ratios (deuterium and tritium), fusion ash (helium), and impurities in the plasma. The eventual purpose of this instrument is for machine protection, basic control, and physics on ITER. Prototyping is ongoing to optimize the hardware setup and measurement capabilities. The DRGA prototype is comprised of a vacuum system and measurement technologies that will overlap to meet ITER measurement requirements. Three technologies included in this diagnostic are a quadrupole mass spectrometer, an ion trap mass spectrometer, and an optical penning gauge that are designed to document relative and absolute gas concentrations.

  14. Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments - Interim Final

    EPA Pesticide Factsheets

    This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.

  15. Evaluation of drainage pipe by field experimentation and supplemental laboratory experimentation : interim report No. 3.

    DOT National Transportation Integrated Search

    1981-11-01

    The Louisiana Department of Transportation and Development reacts to a major problem when it attempts to shape and control drainage patterns along its right-of-ways. The Department's design engineers meet this challenge through proper section design ...

  16. 40 CFR 265.254 - Design and operating requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....254 Section 265.254 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Waste Piles § 265.254 Design and operating requirements. The owner or operator of each...

  17. RF Pulse Design using Nonlinear Gradient Magnetic Fields

    PubMed Central

    Kopanoglu, Emre; Constable, R. Todd

    2014-01-01

    Purpose An iterative k-space trajectory and radio-frequency (RF) pulse design method is proposed for Excitation using Nonlinear Gradient Magnetic fields (ENiGMa). Theory and Methods The spatial encoding functions (SEFs) generated by nonlinear gradient fields (NLGFs) are linearly dependent in Cartesian-coordinates. Left uncorrected, this may lead to flip-angle variations in excitation profiles. In the proposed method, SEFs (k-space samples) are selected using a Matching-Pursuit algorithm, and the RF pulse is designed using a Conjugate-Gradient algorithm. Three variants of the proposed approach are given: the full-algorithm, a computationally-cheaper version, and a third version for designing spoke-based trajectories. The method is demonstrated for various target excitation profiles using simulations and phantom experiments. Results The method is compared to other iterative (Matching-Pursuit and Conjugate Gradient) and non-iterative (coordinate-transformation and Jacobian-based) pulse design methods as well as uniform density spiral and EPI trajectories. The results show that the proposed method can increase excitation fidelity significantly. Conclusion An iterative method for designing k-space trajectories and RF pulses using nonlinear gradient fields is proposed. The method can either be used for selecting the SEFs individually to guide trajectory design, or can be adapted to design and optimize specific trajectories of interest. PMID:25203286

  18. Predicting clinical trial results based on announcements of interim analyses

    PubMed Central

    2014-01-01

    Background Announcements of interim analyses of a clinical trial convey information about the results beyond the trial’s Data Safety Monitoring Board (DSMB). The amount of information conveyed may be minimal, but the fact that none of the trial’s stopping boundaries has been crossed implies that the experimental therapy is neither extremely effective nor hopeless. Predicting success of the ongoing trial is of interest to the trial’s sponsor, the medical community, pharmaceutical companies, and investors. We determine the probability of trial success by quantifying only the publicly available information from interim analyses of an ongoing trial. We illustrate our method in the context of the National Surgical Adjuvant Breast and Bowel (NSABP) trial, C-08. Methods We simulated trials based on the specifics of the NSABP C-08 protocol that were publicly available. We quantified the uncertainty around the treatment effect using prior weights for the various possibilities in light of other colon cancer studies and other studies of the investigational agent, bevacizumab. We considered alternative prior distributions. Results Subsequent to the trial’s third interim analysis, our predictive probabilities were: that the trial would eventually be successful, 48.0%; would stop for futility, 7.4%; and would continue to completion without statistical significance, 44.5%. The actual trial continued to completion without statistical significance. Conclusions Announcements of interim analyses provide information outside the DSMB’s sphere of confidentiality. This information is potentially helpful to clinical trial prognosticators. ‘Information leakage’ from standard interim analyses such as in NSABP C-08 is conventionally viewed as acceptable even though it may be quite revealing. Whether leakage from more aggressive types of adaptations is acceptable should be assessed at the design stage. PMID:24607270

  19. Experimental model: dye penetration of extensive interim restorations used during endodontic treatment while under load in a multiple axis chewing simulator.

    PubMed

    Jensen, Arna-Lee; Abbott, Paul V

    2007-10-01

    The purpose of this study was to design an experimental model that allowed extensive endodontic interim restorations to be tested for dye penetration while under simulated masticatory load. Extracted premolar teeth had standardized mesio-occluso-distal cavities prepared, and the root canals were instrumented. A cotton wool pellet was placed in the pulp chamber, and the cavities were restored with Cavit, IRM, Ketac-Fil Plus, Ketac-Silver, or composite resin (Z100). They were subjected to the equivalent of 3 months of clinical load while exposed to methylene blue dye. Results of this study could not support IRM as a suitable interim endodontic restorative material to use in extensive cavities. The dye penetration in the Ketac-Fil Plus and Ketac-Silver specimens was not predictable, and the results suggested Cavit and Z100 composite resin require further investigations as potentially useful materials for this purpose.

  20. SUSTAINABLE ALLOY DESIGN: SEARCHING FOR RARE EARTH ELEMENT ALTERNATIVES THROUGH CRYSTAL ENGINEERING

    DTIC Science & Technology

    2016-02-26

    Property Maps to Guide Materials Design via Statistical Learning Summer Research Group Meeting – Materials by Design Los Alamos National Laboratory, July...Informatics, Rational design , Quantitative correlative spectroscopy and imaging, DFT, In situ high pressure mechanical property measurements, Superalloy...final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED. Indicate the

  1. Electromagnetic Analysis For The Design Of ITER Diagnostic Port Plugs During Plasma Disruptions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhai, Y

    2014-03-03

    ITER diagnostic port plugs perform many functions including structural support of diagnostic systems under high electromagnetic loads while allowing for diagnostic access to plasma. The design of diagnotic equatorial port plugs (EPP) are largely driven by electromagnetic loads and associate response of EPP structure during plasma disruptions and VDEs. This paper summarizes results of transient electromagnetic analysis using Opera 3d in support of the design activities for ITER diagnostic EPP. A complete distribution of disruption loads on the Diagnostic First Walls (DFWs). Diagnostic Shield Modules (DSMs) and the EPP structure, as well as impact on the system design integration duemore » to electrical contact among various EPP structural components are discussed.« less

  2. From Intent to Action: An Iterative Engineering Process

    ERIC Educational Resources Information Center

    Mouton, Patrice; Rodet, Jacques; Vacaresse, Sylvain

    2015-01-01

    Quite by chance, and over the course of a few haphazard meetings, a Master's degree in "E-learning Design" gradually developed in a Faculty of Economics. Its original and evolving design was the result of an iterative process carried out, not by a single Instructional Designer (ID), but by a full ID team. Over the last 10 years it has…

  3. Loads specification and embedded plate definition for the ITER cryoline system

    NASA Astrophysics Data System (ADS)

    Badgujar, S.; Benkheira, L.; Chalifour, M.; Forgeas, A.; Shah, N.; Vaghela, H.; Sarkar, B.

    2015-12-01

    ITER cryolines (CLs) are complex network of vacuum-insulated multi and single process pipe lines, distributed in three different areas at ITER site. The CLs will support different operating loads during the machine life-time; either considered as nominal, occasional or exceptional. The major loads, which form the design basis are inertial, pressure, temperature, assembly, magnetic, snow, wind, enforced relative displacement and are put together in loads specification. Based on the defined load combinations, conceptual estimation of reaction loads have been carried out for the lines located inside the Tokamak building. Adequate numbers of embedded plates (EPs) per line have been defined and integrated in the building design. The finalization of building EPs to support the lines, before the detailed design, is one of the major design challenges as the usual logic of the design may alter. At the ITER project level, it was important to finalize EPs to allow adequate design and timely availability of the Tokamak building. The paper describes the single loads, load combinations considered in load specification and the approach for conceptual load estimation and selection of EPs for Toroidal Field (TF) Cryoline as an example by converting the load combinations in two main load categories; pressure and seismic.

  4. A superlinear interior points algorithm for engineering design optimization

    NASA Technical Reports Server (NTRS)

    Herskovits, J.; Asquier, J.

    1990-01-01

    We present a quasi-Newton interior points algorithm for nonlinear constrained optimization. It is based on a general approach consisting of the iterative solution in the primal and dual spaces of the equalities in Karush-Kuhn-Tucker optimality conditions. This is done in such a way to have primal and dual feasibility at each iteration, which ensures satisfaction of those optimality conditions at the limit points. This approach is very strong and efficient, since at each iteration it only requires the solution of two linear systems with the same matrix, instead of quadratic programming subproblems. It is also particularly appropriate for engineering design optimization inasmuch at each iteration a feasible design is obtained. The present algorithm uses a quasi-Newton approximation of the second derivative of the Lagrangian function in order to have superlinear asymptotic convergence. We discuss theoretical aspects of the algorithm and its computer implementation.

  5. Integrating Low-Cost Rapid Usability Testing into Agile System Development of Healthcare IT: A Methodological Perspective.

    PubMed

    Kushniruk, Andre W; Borycki, Elizabeth M

    2015-01-01

    The development of more usable and effective healthcare information systems has become a critical issue. In the software industry methodologies such as agile and iterative development processes have emerged to lead to more effective and usable systems. These approaches highlight focusing on user needs and promoting iterative and flexible development practices. Evaluation and testing of iterative agile development cycles is considered an important part of the agile methodology and iterative processes for system design and re-design. However, the issue of how to effectively integrate usability testing methods into rapid and flexible agile design cycles has remained to be fully explored. In this paper we describe our application of an approach known as low-cost rapid usability testing as it has been applied within agile system development in healthcare. The advantages of the integrative approach are described, along with current methodological considerations.

  6. Physics and technology in the ion-cyclotron range of frequency on Tore Supra and TITAN test facility: implication for ITER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Litaudon, X; Bernard, J. M.; Colas, L.

    2013-01-01

    To support the design of an ITER ion-cyclotron range of frequency heating (ICRH) system and to mitigate risks of operation in ITER, CEA has initiated an ambitious Research & Development program accompanied by experiments on Tore Supra or test-bed facility together with a significant modelling effort. The paper summarizes the recent results in the following areas: Comprehensive characterization (experiments and modelling) of a new Faraday screen concept tested on the Tore Supra antenna. A new model is developed for calculating the ICRH sheath rectification at the antenna vicinity. The model is applied to calculate the local heat flux on Toremore » Supra and ITER ICRH antennas. Full-wave modelling of ITER ICRH heating and current drive scenarios with the EVE code. With 20 MW of power, a current of 400 kA could be driven on axis in the DT scenario. Comparison between DT and DT(3He) scenario is given for heating and current drive efficiencies. First operation of CW test-bed facility, TITAN, designed for ITER ICRH components testing and could host up to a quarter of an ITER antenna. R&D of high permittivity materials to improve load of test facilities to better simulate ITER plasma antenna loading conditions.« less

  7. Seismic Design of ITER Component Cooling Water System-1 Piping

    NASA Astrophysics Data System (ADS)

    Singh, Aditya P.; Jadhav, Mahesh; Sharma, Lalit K.; Gupta, Dinesh K.; Patel, Nirav; Ranjan, Rakesh; Gohil, Guman; Patel, Hiren; Dangi, Jinendra; Kumar, Mohit; Kumar, A. G. A.

    2017-04-01

    The successful performance of ITER machine very much depends upon the effective removal of heat from the in-vessel components and other auxiliary systems during Tokamak operation. This objective will be accomplished by the design of an effective Cooling Water System (CWS). The optimized piping layout design is an important element in CWS design and is one of the major design challenges owing to the factors of large thermal expansion and seismic accelerations; considering safety, accessibility and maintainability aspects. An important sub-system of ITER CWS, Component Cooling Water System-1 (CCWS-1) has very large diameter of pipes up to DN1600 with many intersections to fulfill the process flow requirements of clients for heat removal. Pipe intersection is the weakest link in the layout due to high stress intensification factor. CCWS-1 piping up to secondary confinement isolation valves as well as in-between these isolation valves need to survive a Seismic Level-2 (SL-2) earthquake during the Tokamak operation period to ensure structural stability of the system in the Safe Shutdown Earthquake (SSE) event. This paper presents the design, qualification and optimization of layout of ITER CCWS-1 loop to withstand SSE event combined with sustained and thermal loads as per the load combinations defined by ITER and allowable limits as per ASME B31.3, This paper also highlights the Modal and Response Spectrum Analyses done to find out the natural frequency and system behavior during the seismic event.

  8. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    NASA Technical Reports Server (NTRS)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  9. Sample size determination in group-sequential clinical trials with two co-primary endpoints

    PubMed Central

    Asakura, Koko; Hamasaki, Toshimitsu; Sugimoto, Tomoyuki; Hayashi, Kenichi; Evans, Scott R; Sozu, Takashi

    2014-01-01

    We discuss sample size determination in group-sequential designs with two endpoints as co-primary. We derive the power and sample size within two decision-making frameworks. One is to claim the test intervention’s benefit relative to control when superiority is achieved for the two endpoints at the same interim timepoint of the trial. The other is when the superiority is achieved for the two endpoints at any interim timepoint, not necessarily simultaneously. We evaluate the behaviors of sample size and power with varying design elements and provide a real example to illustrate the proposed sample size methods. In addition, we discuss sample size recalculation based on observed data and evaluate the impact on the power and Type I error rate. PMID:24676799

  10. Finding the Optimal Guidance for Enhancing Anchored Instruction

    ERIC Educational Resources Information Center

    Zydney, Janet Mannheimer; Bathke, Arne; Hasselbring, Ted S.

    2014-01-01

    This study investigated the effect of different methods of guidance with anchored instruction on students' mathematical problem-solving performance. The purpose of this research was to iteratively design a learning environment to find the optimal level of guidance. Two iterations of the software were compared. The first iteration used explicit…

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    In October, 2007, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) presented the document Interim Measure Conceptual Design (Argonne 2007a) to the Kansas Department of Health and Environment, Bureau of Environmental Remediation (KDHE/BER), for a proposed non-emergency Interim Measure (IM) at the site of the former CCC/USDA grain storage facility in Centralia, Kansas (Figure 1.1). The IM was recommended to mitigate existing levels of carbon tetrachloride contamination identified in the vadose zone soils beneath the former facility and in the groundwater beneath and in the vicinity of the former facility, as well as to moderate or decreasemore » the potential future concentrations of carbon tetrachloride in the groundwater. The Interim Measure Conceptual Design (Argonne 2007a) was developed in accordance with the KDHE/BER Policy No.BERRS-029, Policy and Scope of Work: Interim Measures (KDHE 1996). The hydrogeologic, geochemical, and contaminant distribution characteristics of the Centralia site, as identified by the CCC/USDA, factored into the development of the nonemergency IM proposal. These characteristics were summarized in the Interim Measure Conceptual Design (Argonne 2007a) and were discussed in detail in previous Argonne reports (Argonne 2002a, 2003, 2004, 2005a,b,c, 2006a,b, 2007b). The identified remedial goals of the proposed IM were as follows: (1) To reduce the existing concentrations of carbon tetrachloride in groundwater in three 'hot spot' areas identified at the site (at SB01, SB05, and SB12-MW02; Figure 1.2) to levels acceptable to the KDHE. (2) To reduce carbon tetrachloride concentrations in the soils near the location of former soil boring SB12 and existing monitoring well MW02 (Figure 1.2) to levels below the KDHE Tier 2 Risk-Based Screening Level (RBSL) of 200 {micro}g/kg for this contaminant. To address these goals, the potential application of an in situ chemical reduction (ISCR) treatment technology, employing the use of the EHC{reg_sign} treatment materials marketed by Adventus Americas, Inc. (Freeport, Illinois), was recommended. The EHC materials are proprietary mixtures of food-grade organic carbon and zero-valent iron that are injected into the subsurface as a slurry (EHC) or in dissolved form (EHC-A) and subsequently released slowly into the formation. The materials are designed to create highly reducing geochemical conditions in the vadose and saturated zones that foster both thermodynamic and biological reductive dechlorination of carbon tetrachloride.« less

  12. Evaluation of drainage pipe by field experimentation and supplemental laboratory experimentation : interim report No. 2.

    DOT National Transportation Integrated Search

    1978-03-01

    Louisiana's Office of Highways reacts to a major problem when it attempts to shape and control drainage patterns along its right-of-ways. The Office's design engineers meet this challenge through proper section design and appropriate application of d...

  13. Evaluation of drainage pipe by field experimentation and supplemental laboratory experimentation : interim report No. 1.

    DOT National Transportation Integrated Search

    1977-03-01

    Louisiana's Office of Highways reacts to a major problem when it attempts to shape and control drainage patterns along its right-of-ways. The Office's design engineers meet this challenge through proper section design and appropriate application of d...

  14. Feasibility evaluation of utilizing high strength concrete in design and construction of highway bridge structures : interim report.

    DOT National Transportation Integrated Search

    1992-12-01

    The objective of this investigation was to evaluate the feasibility of using high-strength concrete in the design and construction of highway bridge structures. A literature search was conducted; a survey of five regional fabrication plants was perfo...

  15. Status of the Negative Ion Based Heating and Diagnostic Neutral Beams for ITER

    NASA Astrophysics Data System (ADS)

    Schunke, B.; Bora, D.; Hemsworth, R.; Tanga, A.

    2009-03-01

    The current baseline of ITER foresees 2 Heating Neutral Beam (HNB's) systems based on negative ion technology, each accelerating to 1 MeV 40 A of D- and capable of delivering 16.5 MW of D0 to the ITER plasma, with a 3rd HNB injector foreseen as an upgrade option [1]. In addition a dedicated Diagnostic Neutral Beam (DNB) accelerating 60 A of H- to 100 keV will inject ≈15 A equivalent of H0 for charge exchange recombination spectroscopy and other diagnostics. Recently the RF driven negative ion source developed by IPP Garching has replaced the filamented ion source as the reference ITER design. The RF source developed at IPP, which is approximately a quarter scale of the source needed for ITER, is expected to have reduced caesium consumption compared to the filamented arc driven ion source. The RF driven source has demonstrated adequate accelerated D- and H- current densities as well as long-pulse operation [2, 3]. It is foreseen that the HNB's and the DNB will use the same negative ion source. Experiments with a half ITER-size ion source are on-going at IPP and the operation of a full-scale ion source will be demonstrated, at full power and pulse length, in the dedicated Ion Source Test Bed (ISTF), which will be part of the Neutral Beam Test Facility (NBTF), in Padua, Italy. This facility will carry out the necessary R&D for the HNB's for ITER and demonstrate operation of the full-scale HNB beamline. An overview of the current status of the neutral beam (NB) systems and the chosen configuration will be given and the ongoing integration effort into the ITER plant will be highlighted. It will be demonstrated how installation and maintenance logistics have influenced the design, notably the top access scheme facilitating access for maintenance and installation. The impact of the ITER Design Review and recent design change requests (DCRs) will be briefly discussed, including start-up and commissioning issues. The low current hydrogen phase now envisaged for start-up imposed specific requirements for operating the HNB's at full beam power. It has been decided to address the shinethrough issue by installing wall armour protection, which increases the operational space in all scenarios. Other NB related issues identified by the Design Review process will be discussed and the possible changes to the ITER baseline indicated.

  16. Status of the Negative Ion Based Heating and Diagnostic Neutral Beams for ITER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schunke, B.; Bora, D.; Hemsworth, R.

    2009-03-12

    The current baseline of ITER foresees 2 Heating Neutral Beam (HNB's) systems based on negative ion technology, each accelerating to 1 MeV 40 A of D{sup -} and capable of delivering 16.5 MW of D{sup 0} to the ITER plasma, with a 3rd HNB injector foreseen as an upgrade option. In addition a dedicated Diagnostic Neutral Beam (DNB) accelerating 60 A of H{sup -} to 100 keV will inject {approx_equal}15 A equivalent of H{sup 0} for charge exchange recombination spectroscopy and other diagnostics. Recently the RF driven negative ion source developed by IPP Garching has replaced the filamented ion sourcemore » as the reference ITER design. The RF source developed at IPP, which is approximately a quarter scale of the source needed for ITER, is expected to have reduced caesium consumption compared to the filamented arc driven ion source. The RF driven source has demonstrated adequate accelerated D{sup -} and H{sup -} current densities as well as long-pulse operation. It is foreseen that the HNB's and the DNB will use the same negative ion source. Experiments with a half ITER-size ion source are on-going at IPP and the operation of a full-scale ion source will be demonstrated, at full power and pulse length, in the dedicated Ion Source Test Bed (ISTF), which will be part of the Neutral Beam Test Facility (NBTF), in Padua, Italy. This facility will carry out the necessary R and D for the HNB's for ITER and demonstrate operation of the full-scale HNB beamline. An overview of the current status of the neutral beam (NB) systems and the chosen configuration will be given and the ongoing integration effort into the ITER plant will be highlighted. It will be demonstrated how installation and maintenance logistics have influenced the design, notably the top access scheme facilitating access for maintenance and installation. The impact of the ITER Design Review and recent design change requests (DCRs) will be briefly discussed, including start-up and commissioning issues. The low current hydrogen phase now envisaged for start-up imposed specific requirements for operating the HNB's at full beam power. It has been decided to address the shinethrough issue by installing wall armour protection, which increases the operational space in all scenarios. Other NB related issues identified by the Design Review process will be discussed and the possible changes to the ITER baseline indicated.« less

  17. Integrated Collaborative Model in Research and Education with Emphasis on Small Satellite Technology

    DTIC Science & Technology

    1996-01-01

    feedback; the number of iterations in a complete iteration is referred to as loop depth or iteration depth, g (i). A data packet or packet is data...loop depth, g (i)) is either a finite (constant or variable) or an infinite value. 1) Finite loop depth, variable number of iterations Some problems...design time. The time needed for the first packet to leave and a new initial data to be introduced to the iteration is min(R * ( g (k) * (N+I) + k-1

  18. ITER EDA Newsletter. Volume 3, no. 2

    NASA Astrophysics Data System (ADS)

    1994-02-01

    This issue of the ITER EDA (Engineering Design Activities) Newsletter contains reports on the Fifth ITER Council Meeting held in Garching, Germany, January 27-28, 1994, a visit (January 28, 1994) of an international group of Harvard Fellows to the San Diego Joint Work Site, the Inauguration Ceremony of the EC-hosted ITER joint work site in Garching (January 28, 1994), on an ITER Technical Meeting on Assembly and Maintenance held in Garching, Germany, January 19-26, 1994, and a report on a Technical Committee Meeting on radiation effects on in-vessel components held in Garching, Germany, November 15-19, 1993, as well as an ITER Status Report.

  19. ITER's Tokamak Cooling Water System and the the Use of ASME Codes to Comply with French Regulations of Nuclear Pressure Equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berry, Jan; Ferrada, Juan J; Curd, Warren

    During inductive plasma operation of ITER, fusion power will reach 500 MW with an energy multiplication factor of 10. The heat will be transferred by the Tokamak Cooling Water System (TCWS) to the environment using the secondary cooling system. Plasma operations are inherently safe even under the most severe postulated accident condition a large, in-vessel break that results in a loss-of-coolant accident. A functioning cooling water system is not required to ensure safe shutdown. Even though ITER is inherently safe, TCWS equipment (e.g., heat exchangers, piping, pressurizers) are classified as safety important components. This is because the water is predictedmore » to contain low-levels of radionuclides (e.g., activated corrosion products, tritium) with activity levels high enough to require the design of components to be in accordance with French regulations for nuclear pressure equipment, i.e., the French Order dated 12 December 2005 (ESPN). ESPN has extended the practical application of the methodology established by the Pressure Equipment Directive (97/23/EC) to nuclear pressure equipment, under French Decree 99-1046 dated 13 December 1999, and Order dated 21 December 1999 (ESP). ASME codes and supplementary analyses (e.g., Failure Modes and Effects Analysis) will be used to demonstrate that the TCWS equipment meets these essential safety requirements. TCWS is being designed to provide not only cooling, with a capacity of approximately 1 GW energy removal, but also elevated temperature baking of first-wall/blanket, vacuum vessel, and divertor. Additional TCWS functions include chemical control of water, draining and drying for maintenance, and facilitation of leak detection/localization. The TCWS interfaces with the majority of ITER systems, including the secondary cooling system. U.S. ITER is responsible for design, engineering, and procurement of the TCWS with industry support from an Engineering Services Organization (ESO) (AREVA Federal Services, with support from Northrop Grumman, and OneCIS). ITER International Organization (ITER-IO) is responsible for design oversight and equipment installation in Cadarache, France. TCWS equipment will be fabricated using ASME design codes with quality assurance and oversight by an Agreed Notified Body (approved by the French regulator) that will ensure regulatory compliance. This paper describes the TCWS design and how U.S. ITER and fabricators will use ASME codes to comply with EU Directives and French Orders and Decrees.« less

  20. Maximum type 1 error rate inflation in multiarmed clinical trials with adaptive interim sample size modifications.

    PubMed

    Graf, Alexandra C; Bauer, Peter; Glimm, Ekkehard; Koenig, Franz

    2014-07-01

    Sample size modifications in the interim analyses of an adaptive design can inflate the type 1 error rate, if test statistics and critical boundaries are used in the final analysis as if no modification had been made. While this is already true for designs with an overall change of the sample size in a balanced treatment-control comparison, the inflation can be much larger if in addition a modification of allocation ratios is allowed as well. In this paper, we investigate adaptive designs with several treatment arms compared to a single common control group. Regarding modifications, we consider treatment arm selection as well as modifications of overall sample size and allocation ratios. The inflation is quantified for two approaches: a naive procedure that ignores not only all modifications, but also the multiplicity issue arising from the many-to-one comparison, and a Dunnett procedure that ignores modifications, but adjusts for the initially started multiple treatments. The maximum inflation of the type 1 error rate for such types of design can be calculated by searching for the "worst case" scenarios, that are sample size adaptation rules in the interim analysis that lead to the largest conditional type 1 error rate in any point of the sample space. To show the most extreme inflation, we initially assume unconstrained second stage sample size modifications leading to a large inflation of the type 1 error rate. Furthermore, we investigate the inflation when putting constraints on the second stage sample sizes. It turns out that, for example fixing the sample size of the control group, leads to designs controlling the type 1 error rate. © 2014 The Author. Biometrical Journal published by WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  1. Statistical controversies in clinical research: building the bridge to phase II-efficacy estimation in dose-expansion cohorts.

    PubMed

    Boonstra, P S; Braun, T M; Taylor, J M G; Kidwell, K M; Bellile, E L; Daignault, S; Zhao, L; Griffith, K A; Lawrence, T S; Kalemkerian, G P; Schipper, M J

    2017-07-01

    Regulatory agencies and others have expressed concern about the uncritical use of dose expansion cohorts (DECs) in phase I oncology trials. Nonetheless, by several metrics-prevalence, size, and number-their popularity is increasing. Although early efficacy estimation in defined populations is a common primary endpoint of DECs, the types of designs best equipped to identify efficacy signals have not been established. We conducted a simulation study of six phase I design templates with multiple DECs: three dose-assignment/adjustment mechanisms multiplied by two analytic approaches for estimating efficacy after the trial is complete. We also investigated the effect of sample size and interim futility analysis on trial performance. Identifying populations in which the treatment is efficacious (true positives) and weeding out inefficacious treatment/populations (true negatives) are competing goals in these trials. Thus, we estimated true and false positive rates for each design. Adaptively updating the MTD during the DEC improved true positive rates by 8-43% compared with fixing the dose during the DEC phase while maintaining false positive rates. Inclusion of an interim futility analysis decreased the number of patients treated under inefficacious DECs without hurting performance. A substantial gain in efficiency is obtainable using a design template that statistically models toxicity and efficacy against dose level during expansion. Design choices for dose expansion should be motivated by and based upon expected performance. Similar to the common practice in single-arm phase II trials, cohort sample sizes should be justified with respect to their primary aim and include interim analyses to allow for early stopping. © The Author 2017. Published by Oxford University Press on behalf of the European Society for Medical Oncology. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  2. Design of ITER divertor VUV spectrometer and prototype test at KSTAR tokamak

    NASA Astrophysics Data System (ADS)

    Seon, Changrae; Hong, Joohwan; Song, Inwoo; Jang, Juhyeok; Lee, Hyeonyong; An, Younghwa; Kim, Bosung; Jeon, Taemin; Park, Jaesun; Choe, Wonho; Lee, Hyeongon; Pak, Sunil; Cheon, MunSeong; Choi, Jihyeon; Kim, Hyeonseok; Biel, Wolfgang; Bernascolle, Philippe; Barnsley, Robin; O'Mullane, Martin

    2017-12-01

    Design and development of the ITER divertor VUV spectrometer have been performed from the year 1998, and it is planned to be installed in the year 2027. Currently, the design of the ITER divertor VUV spectrometer is in the phase of detail design. It is optimized for monitoring of chord-integrated VUV signals from divertor plasmas, chosen to contain representative lines emission from the tungsten as the divertor material, and other impurities. Impurity emission from overall divertor plasmas is collimated through the relay optics onto the entrance slit of a VUV spectrometer with working wavelength range of 14.6-32 nm. To validate the design of the ITER divertor VUV spectrometer, two sets of VUV spectrometers have been developed and tested at KSTAR tokamak. One set of spectrometer without the field mirror employs a survey spectrometer with the wavelength ranging from 14.6 nm to 32 nm, and it provides the same optical specification as the spectrometer part of the ITER divertor VUV spectrometer system. The other spectrometer with the wavelength range of 5-25 nm consists of a commercial spectrometer with a concave grating, and the relay mirrors with the same geometry as the relay mirrors of the ITER divertor VUV spectrometer. From test of these prototypes, alignment method using backward laser illumination could be verified. To validate the feasibility of tungsten emission measurement, furthermore, the tungsten powder was injected in KSTAR plasmas, and the preliminary result could be obtained successfully with regard to the evaluation of photon throughput. Contribution to the Topical Issue "Atomic and Molecular Data and their Applications", edited by Gordon W.F. Drake, Jung-Sik Yoon, Daiji Kato, Grzegorz Karwasz.

  3. Reducing Design Cycle Time and Cost Through Process Resequencing

    NASA Technical Reports Server (NTRS)

    Rogers, James L.

    2004-01-01

    In today's competitive environment, companies are under enormous pressure to reduce the time and cost of their design cycle. One method for reducing both time and cost is to develop an understanding of the flow of the design processes and the effects of the iterative subcycles that are found in complex design projects. Once these aspects are understood, the design manager can make decisions that take advantage of decomposition, concurrent engineering, and parallel processing techniques to reduce the total time and the total cost of the design cycle. One software tool that can aid in this decision-making process is the Design Manager's Aid for Intelligent Decomposition (DeMAID). The DeMAID software minimizes the feedback couplings that create iterative subcycles, groups processes into iterative subcycles, and decomposes the subcycles into a hierarchical structure. The real benefits of producing the best design in the least time and at a minimum cost are obtained from sequencing the processes in the subcycles.

  4. Evaluating the performance of two neutron spectrum unfolding codes based on iterative procedures and artificial neural networks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ortiz-Rodriguez, J. M.; Reyes Alfaro, A.; Reyes Haro, A.

    In this work the performance of two neutron spectrum unfolding codes based on iterative procedures and artificial neural networks is evaluated. The first one code based on traditional iterative procedures and called Neutron spectrometry and dosimetry from the Universidad Autonoma de Zacatecas (NSDUAZ) use the SPUNIT iterative algorithm and was designed to unfold neutron spectrum and calculate 15 dosimetric quantities and 7 IAEA survey meters. The main feature of this code is the automated selection of the initial guess spectrum trough a compendium of neutron spectrum compiled by the IAEA. The second one code known as Neutron spectrometry and dosimetrymore » with artificial neural networks (NDSann) is a code designed using neural nets technology. The artificial intelligence approach of neural net does not solve mathematical equations. By using the knowledge stored at synaptic weights on a neural net properly trained, the code is capable to unfold neutron spectrum and to simultaneously calculate 15 dosimetric quantities, needing as entrance data, only the rate counts measured with a Bonner spheres system. Similarities of both NSDUAZ and NSDann codes are: they follow the same easy and intuitive user's philosophy and were designed in a graphical interface under the LabVIEW programming environment. Both codes unfold the neutron spectrum expressed in 60 energy bins, calculate 15 dosimetric quantities and generate a full report in HTML format. Differences of these codes are: NSDUAZ code was designed using classical iterative approaches and needs an initial guess spectrum in order to initiate the iterative procedure. In NSDUAZ, a programming routine was designed to calculate 7 IAEA instrument survey meters using the fluence-dose conversion coefficients. NSDann code use artificial neural networks for solving the ill-conditioned equation system of neutron spectrometry problem through synaptic weights of a properly trained neural network. Contrary to iterative procedures, in neural net approach it is possible to reduce the rate counts used to unfold the neutron spectrum. To evaluate these codes a computer tool called Neutron Spectrometry and dosimetry computer tool was designed. The results obtained with this package are showed. The codes here mentioned are freely available upon request to the authors.« less

  5. Evaluating the performance of two neutron spectrum unfolding codes based on iterative procedures and artificial neural networks

    NASA Astrophysics Data System (ADS)

    Ortiz-Rodríguez, J. M.; Reyes Alfaro, A.; Reyes Haro, A.; Solís Sánches, L. O.; Miranda, R. Castañeda; Cervantes Viramontes, J. M.; Vega-Carrillo, H. R.

    2013-07-01

    In this work the performance of two neutron spectrum unfolding codes based on iterative procedures and artificial neural networks is evaluated. The first one code based on traditional iterative procedures and called Neutron spectrometry and dosimetry from the Universidad Autonoma de Zacatecas (NSDUAZ) use the SPUNIT iterative algorithm and was designed to unfold neutron spectrum and calculate 15 dosimetric quantities and 7 IAEA survey meters. The main feature of this code is the automated selection of the initial guess spectrum trough a compendium of neutron spectrum compiled by the IAEA. The second one code known as Neutron spectrometry and dosimetry with artificial neural networks (NDSann) is a code designed using neural nets technology. The artificial intelligence approach of neural net does not solve mathematical equations. By using the knowledge stored at synaptic weights on a neural net properly trained, the code is capable to unfold neutron spectrum and to simultaneously calculate 15 dosimetric quantities, needing as entrance data, only the rate counts measured with a Bonner spheres system. Similarities of both NSDUAZ and NSDann codes are: they follow the same easy and intuitive user's philosophy and were designed in a graphical interface under the LabVIEW programming environment. Both codes unfold the neutron spectrum expressed in 60 energy bins, calculate 15 dosimetric quantities and generate a full report in HTML format. Differences of these codes are: NSDUAZ code was designed using classical iterative approaches and needs an initial guess spectrum in order to initiate the iterative procedure. In NSDUAZ, a programming routine was designed to calculate 7 IAEA instrument survey meters using the fluence-dose conversion coefficients. NSDann code use artificial neural networks for solving the ill-conditioned equation system of neutron spectrometry problem through synaptic weights of a properly trained neural network. Contrary to iterative procedures, in neural net approach it is possible to reduce the rate counts used to unfold the neutron spectrum. To evaluate these codes a computer tool called Neutron Spectrometry and dosimetry computer tool was designed. The results obtained with this package are showed. The codes here mentioned are freely available upon request to the authors.

  6. Development of an improved overlay design procedure for Oregon : vol. I, interim report, background and framework.

    DOT National Transportation Integrated Search

    1986-12-01

    This report is the first in a three-volume series dealing with the development of an improved overlay design procedure for Oregon. This report presents the results of the first-year findings and includes: (1) a detailed review of the literature; (2) ...

  7. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... more design characteristics which prevent testing of the basic model according to the prescribed test... its true energy consumption characteristics as to provide materially inaccurate comparative data. (2... design characteristic(s) constituting the grounds for the petition, and the specific requirements sought...

  8. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... design characteristics which either prevent testing of the basic model according to the prescribed test... faucets, showerheads, water closets, and urinals) as to provide materially inaccurate comparative data. (2... particular basic model(s) for which a waiver is requested, the design characteristic(s) constituting the...

  9. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... more design characteristics which prevent testing of the basic model according to the prescribed test... its true energy consumption characteristics as to provide materially inaccurate comparative data. (2... particular basic model(s) for which a waiver is requested, the design characteristic(s) constituting the...

  10. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... more design characteristics which prevent testing of the basic model according to the prescribed test... its true energy consumption characteristics as to provide materially inaccurate comparative data. (2... design characteristic(s) constituting the grounds for the petition, and the specific requirements sought...

  11. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... design characteristics which either prevent testing of the basic model according to the prescribed test... faucets, showerheads, water closets, and urinals) as to provide materially inaccurate comparative data. (2... contains a design characteristic which either prevents testing of the basic model according to the...

  12. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... design characteristics which either prevent testing of the basic model according to the prescribed test... faucets, showerheads, water closets, and urinals) as to provide materially inaccurate comparative data. (2... contains a design characteristic which either prevents testing of the basic model according to the...

  13. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... more design characteristics which prevent testing of the basic model according to the prescribed test... its true energy consumption characteristics as to provide materially inaccurate comparative data. (2... design characteristic(s) constituting the grounds for the petition, and the specific requirements sought...

  14. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... more design characteristics which prevent testing of the basic model according to the prescribed test... its true energy consumption characteristics as to provide materially inaccurate comparative data. (2... particular basic model(s) for which a waiver is requested, the design characteristic(s) constituting the...

  15. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... design characteristics which either prevent testing of the basic model according to the prescribed test... faucets, showerheads, water closets, and urinals) as to provide materially inaccurate comparative data. (2... particular basic model(s) for which a waiver is requested, the design characteristic(s) constituting the...

  16. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... design characteristics which either prevent testing of the basic model according to the prescribed test... faucets, showerheads, water closets, and urinals) as to provide materially inaccurate comparative data. (2... contains a design characteristic which either prevents testing of the basic model according to the...

  17. 77 FR 16661 - Tuberculosis in Cattle and Bison; State and Zone Designations; NM; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ...-0124] Tuberculosis in Cattle and Bison; State and Zone Designations; NM; Correction AGENCY: Animal and... in the regulatory text of an interim rule that amended the bovine tuberculosis regulations by establishing two separate zones with different tuberculosis risk classifications for the State of New Mexico...

  18. 76 FR 61253 - Tuberculosis in Cattle and Bison; State and Zone Designations; Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    .... APHIS-2011-0100] Tuberculosis in Cattle and Bison; State and Zone Designations; Minnesota AGENCY: Animal... are amending the bovine tuberculosis regulations regarding State and zone classifications by... for tuberculosis. DATES: This interim rule is effective October 4, 2011. We will consider all comments...

  19. Computer Science 205. Interim Guide, 1983.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education, Winnipeg.

    This guide to a 4-unit, required high school computer science course emphasizes problem solving and computer programming and is designed for use with a variety of hardware configurations and programming languages. An overview covers the program rationale, goals and objectives, program design and description, program implementation, time allotment,…

  20. Development of performance specifications for collision avoidance systems for lane change crashes. Task 6, interim report : testbed systems design and associated facilities

    DOT National Transportation Integrated Search

    2001-11-01

    This report documents the design of an on-road testbed vehicle. The purposes of this testbed are twofold: (1) Establish a foundation for estimating lane change collision avoidance effectiveness, and (2) provide information pertinent to setting perfor...

  1. Miscellaneous wood structures

    Treesearch

    Michael A. Ritter; Keith F. Faherty

    1999-01-01

    This section addresses the design of two types of glulam timber bridges : beam bridges with transverse decks and longitudinal glulam deck (slab) bridges. The material presented in the section is based on the 1992 edition of the AASHTO Standard Specifications for Highway Bridges (AASHTO specifications), including interim specifications through 1993. When specific design...

  2. Shuttle/IUS performance for planetary missions. [Interim Upper Stage

    NASA Technical Reports Server (NTRS)

    Cork, M. J.; Driver, J. M.; Wright, J. L.

    1975-01-01

    Potential requirements for planetary missions in the 1980s, capabilities of the Interim Upper Stage (IUS) candidates to perform those missions, and Shuttle/IUS mission profile options for performance enhancement are examined. The most demanding planetary missions are the Pioneer Saturn/Uranus/Titan Probe and the Mariner-class orbiters of Mercury, Jupiter, and Saturn. Options available to designers of these missions will depend on the specific IUS selected for development and the programmatic phasing of the IUS and the NASA Tug. Use of Shuttle elliptic orbits as initial conditions for IUS ignition offers significant performance improvements; specific values are mission dependent.

  3. Perl Modules for Constructing Iterators

    NASA Technical Reports Server (NTRS)

    Tilmes, Curt

    2009-01-01

    The Iterator Perl Module provides a general-purpose framework for constructing iterator objects within Perl, and a standard API for interacting with those objects. Iterators are an object-oriented design pattern where a description of a series of values is used in a constructor. Subsequent queries can request values in that series. These Perl modules build on the standard Iterator framework and provide iterators for some other types of values. Iterator::DateTime constructs iterators from DateTime objects or Date::Parse descriptions and ICal/RFC 2445 style re-currence descriptions. It supports a variety of input parameters, including a start to the sequence, an end to the sequence, an Ical/RFC 2445 recurrence describing the frequency of the values in the series, and a format description that can refine the presentation manner of the DateTime. Iterator::String constructs iterators from string representations. This module is useful in contexts where the API consists of supplying a string and getting back an iterator where the specific iteration desired is opaque to the caller. It is of particular value to the Iterator::Hash module which provides nested iterations. Iterator::Hash constructs iterators from Perl hashes that can include multiple iterators. The constructed iterators will return all the permutations of the iterations of the hash by nested iteration of embedded iterators. A hash simply includes a set of keys mapped to values. It is a very common data structure used throughout Perl programming. The Iterator:: Hash module allows a hash to include strings defining iterators (parsed and dispatched with Iterator::String) that are used to construct an overall series of hash values.

  4. Instructional System Design for Executive Orientation and Project Management Training Packages, Technical Memorandum No. 3. Interim Report. RF Project No. 3131-A1.

    ERIC Educational Resources Information Center

    Cook, Desmond L.; And Others

    This memorandum reports on the third phase, the design, of a four-phase project to design project management training materials for local educational agencies. The first section of the memorandum explains some considerations regarding management education and the organization of the report. Section 2 presents the design specifications for the…

  5. Electromagnetic Analysis of ITER Diagnostic Equatorial Port Plugs During Plasma Disruptions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Y. Zhai, R. Feder, A. Brooks, M. Ulrickson, C.S. Pitcher and G.D. Loesser

    2012-08-27

    ITER diagnostic port plugs perform many functionsincluding structural support of diagnostic systems under high electromagnetic loads while allowing for diagnostic access to the plasma. The design of diagnostic equatorial port plugs (EPP) are largely driven by electromagnetic loads and associate responses of EPP structure during plasma disruptions and VDEs. This paper summarizes results of transient electromagnetic analysis using Opera 3d in support of the design activities for ITER diagnostic EPP. A complete distribution of disruption loads on the Diagnostic First Walls (DFWs), Diagnostic Shield Modules (DSMs) and the EPP structure, as well as impact on the system design integration duemore » to electrical contact among various EPP structural components are discussed.« less

  6. Observer-based distributed adaptive iterative learning control for linear multi-agent systems

    NASA Astrophysics Data System (ADS)

    Li, Jinsha; Liu, Sanyang; Li, Junmin

    2017-10-01

    This paper investigates the consensus problem for linear multi-agent systems from the viewpoint of two-dimensional systems when the state information of each agent is not available. Observer-based fully distributed adaptive iterative learning protocol is designed in this paper. A local observer is designed for each agent and it is shown that without using any global information about the communication graph, all agents achieve consensus perfectly for all undirected connected communication graph when the number of iterations tends to infinity. The Lyapunov-like energy function is employed to facilitate the learning protocol design and property analysis. Finally, simulation example is given to illustrate the theoretical analysis.

  7. Development of the ITER ICH Transmission Line and Matching System

    NASA Astrophysics Data System (ADS)

    Rasmussen, D. A.; Goulding, R. H.; Pesavento, P. V.; Peters, B.; Swain, D. W.; Fredd, E. H.; Hosea, J.; Greenough, N.

    2011-10-01

    The ITER Ion Cyclotron Heating (ICH) System is designed to couple 20 MW of heating power for ion and electron heating. Prototype components for the ITER Ion Cyclotron Heating (ICH) transmission line and matching system are being designed and tested. The ICH transmission lines are pressurized 300 mm diameter coaxial lines with water-cooled aluminum outer conductor and gas-cooled and water-cooled copper inner conductor. Each ICH transmission line is designed to handle 40-55 MHz power at up to 6 MW/line. A total of 8 lines split to 16 antenna inputs on two ICH antennas. Industrial suppliers have designed coaxial transmission line and matching components and prototypes will be manufactured. The prototype components will be qualified on a test stand operating at the full power and pulse length needed for ITER. The matching system must accommodated dynamic changes in the plasma loading due to ELMS and the L to H-mode transition. Passive ELM tolerance will be performed using hybrid couplers and loads, which can absorb the transient reflected power. The system is also designed to compensate for the mutual inductances of the antenna current straps to limit the peak voltages on the antenna array elements.

  8. Conjecture Mapping to Optimize the Educational Design Research Process

    ERIC Educational Resources Information Center

    Wozniak, Helen

    2015-01-01

    While educational design research promotes closer links between practice and theory, reporting its outcomes from iterations across multiple contexts is often constrained by the volumes of data generated, and the context bound nature of the research outcomes. Reports tend to focus on a single iteration of implementation without further research to…

  9. OVERVIEW OF NEUTRON MEASUREMENTS IN JET FUSION DEVICE.

    PubMed

    Batistoni, P; Villari, R; Obryk, B; Packer, L W; Stamatelatos, I E; Popovichev, S; Colangeli, A; Colling, B; Fonnesu, N; Loreti, S; Klix, A; Klosowski, M; Malik, K; Naish, J; Pillon, M; Vasilopoulou, T; De Felice, P; Pimpinella, M; Quintieri, L

    2017-10-05

    The design and operation of ITER experimental fusion reactor requires the development of neutron measurement techniques and numerical tools to derive the fusion power and the radiation field in the device and in the surrounding areas. Nuclear analyses provide essential input to the conceptual design, optimisation, engineering and safety case in ITER and power plant studies. The required radiation transport calculations are extremely challenging because of the large physical extent of the reactor plant, the complexity of the geometry, and the combination of deep penetration and streaming paths. This article reports the experimental activities which are carried-out at JET to validate the neutronics measurements methods and numerical tools used in ITER and power plant design. A new deuterium-tritium campaign is proposed in 2019 at JET: the unique 14 MeV neutron yields produced will be exploited as much as possible to validate measurement techniques, codes, procedures and data currently used in ITER design thus reducing the related uncertainties and the associated risks in the machine operation. © The Author 2017. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  10. Design optimization of first wall and breeder unit module size for the Indian HCCB blanket module

    NASA Astrophysics Data System (ADS)

    Deepak, SHARMA; Paritosh, CHAUDHURI

    2018-04-01

    The Indian test blanket module (TBM) program in ITER is one of the major steps in the Indian fusion reactor program for carrying out the R&D activities in the critical areas like design of tritium breeding blankets relevant to future Indian fusion devices (ITER relevant and DEMO). The Indian Lead–Lithium Cooled Ceramic Breeder (LLCB) blanket concept is one of the Indian DEMO relevant TBM, to be tested in ITER as a part of the TBM program. Helium-Cooled Ceramic Breeder (HCCB) is an alternative blanket concept that consists of lithium titanate (Li2TiO3) as ceramic breeder (CB) material in the form of packed pebble beds and beryllium as the neutron multiplier. Specifically, attentions are given to the optimization of first wall coolant channel design and size of breeder unit module considering coolant pressure and thermal loads for the proposed Indian HCCB blanket based on ITER relevant TBM and loading conditions. These analyses will help proceeding further in designing blankets for loads relevant to the future fusion device.

  11. In-vessel tritium retention and removal in ITER

    NASA Astrophysics Data System (ADS)

    Federici, G.; Anderl, R. A.; Andrew, P.; Brooks, J. N.; Causey, R. A.; Coad, J. P.; Cowgill, D.; Doerner, R. P.; Haasz, A. A.; Janeschitz, G.; Jacob, W.; Longhurst, G. R.; Nygren, R.; Peacock, A.; Pick, M. A.; Philipps, V.; Roth, J.; Skinner, C. H.; Wampler, W. R.

    Tritium retention inside the vacuum vessel has emerged as a potentially serious constraint in the operation of the International Thermonuclear Experimental Reactor (ITER). In this paper we review recent tokamak and laboratory data on hydrogen, deuterium and tritium retention for materials and conditions which are of direct relevance to the design of ITER. These data, together with significant advances in understanding the underlying physics, provide the basis for modelling predictions of the tritium inventory in ITER. We present the derivation, and discuss the results, of current predictions both in terms of implantation and codeposition rates, and critically discuss their uncertainties and sensitivity to important design and operation parameters such as the plasma edge conditions, the surface temperature, the presence of mixed-materials, etc. These analyses are consistent with recent tokamak findings and show that codeposition of tritium occurs on the divertor surfaces primarily with carbon eroded from a limited area of the divertor near the strike zones. This issue remains an area of serious concern for ITER. The calculated codeposition rates for ITER are relatively high and the in-vessel tritium inventory limit could be reached, under worst assumptions, in approximately a week of continuous operation. We discuss the implications of these estimates on the design, operation and safety of ITER and present a strategy for resolving the issues. We conclude that as long as carbon is used in ITER - and more generically in any other next-step experimental fusion facility fuelled with tritium - the efficient control and removal of the codeposited tritium is essential. There is a critical need to develop and test in situ cleaning techniques and procedures that are beyond the current experience of present-day tokamaks. We review some of the principal methods that are being investigated and tested, in conjunction with the R&D work still required to extrapolate their applicability to ITER. Finally, unresolved issues are identified and recommendations are made on potential R&D avenues for their resolution.

  12. Analysis of Transportation Options for Commercial Spent Fuel in the U.S.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalinina, Elena; Busch, Ingrid Karin

    The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less

  13. Design for sustainable development--household drinking water filter for arsenic and pathogen treatment in Nepal.

    PubMed

    Ngai, Tommy K K; Shrestha, Roshan R; Dangol, Bipin; Maharjan, Makhan; Murcott, Susan E

    2007-10-01

    In the last 20 years, the widespread adoption of shallow tubewells in Nepal Terai region enabled substantial improvement in access to water, but recent national water quality testing showed that 3% of these sources contain arsenic above the Nepali interim guideline of 50 microg/L, and up to 60% contain unsafe microbial contamination. To combat this crisis, MIT, ENPHO and CAWST together researched, developed and implemented a household water treatment technology by applying an iterative, learning development framework. A pilot study comparing 3 technologies against technical, social, and economic criteria showed that the Kanchan Arsenic Filter (KAF) is the most promising technology for Nepal. A two-year technical and social evaluation of over 1000 KAFs deployed in rural villages of Nepal determined that the KAF typically removes 85-90% arsenic, 90-95% iron, 80-95% turbidity, and 85-99% total coliforms. Then 83% of the households continued to use the filter after 1 year, mainly motivated by the clean appearance, improved taste, and reduced odour of the filtered water, as compared to the original water source. Although over 5,000 filters have been implemented in Nepal by January 2007, further research rooted in sustainable development is necessary to understand the technology diffusion and scale-up process, in order to expand access to safe water in the country and beyond.

  14. Status of the ITER Electron Cyclotron Heating and Current Drive System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Darbos, Caroline; Albajar, Ferran; Bonicelli, Tullio

    2015-10-07

    We present that the electron cyclotron (EC) heating and current drive (H&CD) system developed for the ITER is made of 12 sets of high-voltage power supplies feeding 24 gyrotrons connected through 24 transmission lines (TL), to five launchers, four located in upper ports and one at the equatorial level. Nearly all procurements are in-kind, following general ITER philosophy, and will come from Europe, India, Japan, Russia and the USA. The full system is designed to couple to the plasma 20 MW among the 24 MW generated power, at the frequency of 170 GHz, for various physics applications such as plasmamore » start-up, central H&CD and magnetohydrodynamic (MHD) activity control. The design takes present day technology and extends toward high-power continuous operation, which represents a large step forward as compared to the present state of the art. The ITER EC system will be a stepping stone to future EC systems for DEMO and beyond.The development of the EC system is facing significant challenges, which includes not only an advanced microwave system but also compliance with stringent requirements associated with nuclear safety as ITER became the first fusion device licensed as basic nuclear installations as of 9 November 2012. Finally, since the conceptual design of the EC system was established in 2007, the EC system has progressed to a preliminary design stage in 2012 and is now moving forward toward a final design.« less

  15. Fast Acting Eddy Current Driven Valve for Massive Gas Injection on ITER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lyttle, Mark S; Baylor, Larry R; Carmichael, Justin R

    2015-01-01

    Tokamak plasma disruptions present a significant challenge to ITER as they can result in intense heat flux, large forces from halo and eddy currents, and potential first-wall damage from the generation of multi-MeV runaway electrons. Massive gas injection (MGI) of high Z material using fast acting valves is being explored on existing tokamaks and is planned for ITER as a method to evenly distribute the thermal load of the plasma to prevent melting, control the rate of the current decay to minimize mechanical loads, and to suppress the generation of runaway electrons. A fast acting valve and accompanying power supplymore » have been designed and first test articles produced to meet the requirements for a disruption mitigation system on ITER. The test valve incorporates a flyer plate actuator similar to designs deployed on TEXTOR, ASDEX upgrade, and JET [1 3] of a size useful for ITER with special considerations to mitigate the high mechanical forces developed during actuation due to high background magnetic fields. The valve includes a tip design and all-metal valve stem sealing for compatibility with tritium and high neutron and gamma fluxes.« less

  16. Changing the Way We Build Games: A Design-Based Research Study Examining the Implementation of Homemade PowerPoint Games in the Classroom

    ERIC Educational Resources Information Center

    Siko, Jason Paul

    2012-01-01

    This design-based research study examined the effects of a game design project on student test performance, with refinements made to the implementation after each of the three iterations of the study. The changes to the implementation over the three iterations were based on the literature for the three justifications for the use of homemade…

  17. Integrating a Genetic Algorithm Into a Knowledge-Based System for Ordering Complex Design Processes

    NASA Technical Reports Server (NTRS)

    Rogers, James L.; McCulley, Collin M.; Bloebaum, Christina L.

    1996-01-01

    The design cycle associated with large engineering systems requires an initial decomposition of the complex system into design processes which are coupled through the transference of output data. Some of these design processes may be grouped into iterative subcycles. In analyzing or optimizing such a coupled system, it is essential to be able to determine the best ordering of the processes within these subcycles to reduce design cycle time and cost. Many decomposition approaches assume the capability is available to determine what design processes and couplings exist and what order of execution will be imposed during the design cycle. Unfortunately, this is often a complex problem and beyond the capabilities of a human design manager. A new feature, a genetic algorithm, has been added to DeMAID (Design Manager's Aid for Intelligent Decomposition) to allow the design manager to rapidly examine many different combinations of ordering processes in an iterative subcycle and to optimize the ordering based on cost, time, and iteration requirements. Two sample test cases are presented to show the effects of optimizing the ordering with a genetic algorithm.

  18. MFTF-. cap alpha. + T progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, W.D.

    1985-04-01

    Early in FY 1983, several upgrades of the Mirror Fusion Test Facility (MFTF-B) at Lawrence Livermore National Laboratory (LLNL) were proposed to the fusion community. The one most favorably received was designated MFTF-..cap alpha..+T. The engineering design of this device, guided by LLNL, has been a principal activity of the Fusion Engineering Design Center during FY 1983. This interim progress report represents a snapshot of the device design, which was begun in FY 1983 and will continue for several years. The report is organized as a complete design description. Because it is an interim report, some parts are incomplete; theymore » will be supplied as the design study proceeds. As described in this report, MFTF-..cap alpha..+T uses existing facilities, many MFTF-B components, and a number of innovations to improve on the physics parameters of MFTF-B. It burns deuterium-tritium and has a central-cell Q of 2, a wall loading GAMMA/sub n/ of 2 MW/m/sup 2/ (with a central-cell insert module), and an availability of 10%. The machine is fully shielded, allows hands-on maintenance of components outside the vacuum vessel 24 h after shutdown, and has provisions for repair of all operating components.« less

  19. Final Report on ITER Task Agreement 81-08

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richard L. Moore

    As part of an ITER Implementing Task Agreement (ITA) between the ITER US Participant Team (PT) and the ITER International Team (IT), the INL Fusion Safety Program was tasked to provide the ITER IT with upgrades to the fusion version of the MELCOR 1.8.5 code including a beryllium dust oxidation model. The purpose of this model is to allow the ITER IT to investigate hydrogen production from beryllium dust layers on hot surfaces inside the ITER vacuum vessel (VV) during in-vessel loss-of-cooling accidents (LOCAs). Also included in the ITER ITA was a task to construct a RELAP5/ATHENA model of themore » ITER divertor cooling loop to model the draining of the loop during a large ex-vessel pipe break followed by an in-vessel divertor break and compare the results to a simular MELCOR model developed by the ITER IT. This report, which is the final report for this agreement, documents the completion of the work scope under this ITER TA, designated as TA 81-08.« less

  20. Jointless bridges : interim report.

    DOT National Transportation Integrated Search

    1980-01-01

    Presented is a summary of jointless bridge designs as twelve states; namely, California, Colorado, Idaho, Iowa, Kansas, Missouri, Nebraska, North Dakota, South Dakota, Tennessee, Virginia, and Wisconsin. Most of these states use some form of integral...

  1. Pembrolizumab for Ipilimumab-Resistant Melanoma

    Cancer.gov

    KEYNOTE-002 was designed to test the safety and efficacy of two doses of pembrolizumab compared with chemotherapy in patients with ipilimumab-resistant melanoma; interim results show that pembrolizumab improves progression-free survival for these patients

  2. Interim Procedures Safeguarding Mobile Devices during International Travel

    EPA Pesticide Factsheets

    This procedure is for safeguarding EPA information and systems for all employees, contractors, and other users while on international travel or to specifically designated locations within the United States and foreign embassies.

  3. The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voegele, Michael D.; Vieth, Donald

    2013-07-01

    The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should bemore » implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)« less

  4. Studies on Flat Sandwich-type Self-Powered Detectors for Flux Measurements in ITER Test Blanket Modules

    NASA Astrophysics Data System (ADS)

    Raj, Prasoon; Angelone, Maurizio; Döring, Toralf; Eberhardt, Klaus; Fischer, Ulrich; Klix, Axel; Schwengner, Ronald

    2018-01-01

    Neutron and gamma flux measurements in designated positions in the test blanket modules (TBM) of ITER will be important tasks during ITER's campaigns. As part of the ongoing task on development of nuclear instrumentation for application in European ITER TBMs, experimental investigations on self-powered detectors (SPD) are undertaken. This paper reports the findings of neutron and photon irradiation tests performed with a test SPD in flat sandwich-like geometry. Whereas both neutrons and gammas can be detected with appropriate optimization of geometries, materials and sizes of the components, the present sandwich-like design is more sensitive to gammas than 14 MeV neutrons. Range of SPD current signals achievable under TBM conditions are predicted based on the SPD sensitivities measured in this work.

  5. Design of a -1 MV dc UHV power supply for ITER NBI

    NASA Astrophysics Data System (ADS)

    Watanabe, K.; Yamamoto, M.; Takemoto, J.; Yamashita, Y.; Dairaku, M.; Kashiwagi, M.; Taniguchi, M.; Tobari, H.; Umeda, N.; Sakamoto, K.; Inoue, T.

    2009-05-01

    Procurement of a dc -1 MV power supply system for the ITER neutral beam injector (NBI) is shared by Japan and the EU. The Japan Atomic Energy Agency as the Japan Domestic Agency (JADA) for ITER contributes to the procurement of dc -1 MV ultra-high voltage (UHV) components such as a dc -1 MV generator, a transmission line and a -1 MV insulating transformer for the ITER NBI power supply. The inverter frequency of 150 Hz in the -1 MV power supply and major circuit parameters have been proposed and adopted in the ITER NBI. The dc UHV insulation has been carefully designed since dc long pulse insulation is quite different from conventional ac insulation or dc short pulse systems. A multi-layer insulation structure of the transformer for a long pulse up to 3600 s has been designed with electric field simulation. Based on the simulation the overall dimensions of the dc UHV components have been finalized. A surge energy suppression system is also essential to protect the accelerator from electric breakdowns. The JADA contributes to provide an effective surge suppression system composed of core snubbers and resistors. Input energy into the accelerator from the power supply can be reduced to about 20 J, which satisfies the design criteria of 50 J in total in the case of breakdown at -1 MV.

  6. Aerodynamic optimization by simultaneously updating flow variables and design parameters with application to advanced propeller designs

    NASA Technical Reports Server (NTRS)

    Rizk, Magdi H.

    1988-01-01

    A scheme is developed for solving constrained optimization problems in which the objective function and the constraint function are dependent on the solution of the nonlinear flow equations. The scheme updates the design parameter iterative solutions and the flow variable iterative solutions simultaneously. It is applied to an advanced propeller design problem with the Euler equations used as the flow governing equations. The scheme's accuracy, efficiency and sensitivity to the computational parameters are tested.

  7. Iterative design of one- and two-dimensional FIR digital filters. [Finite duration Impulse Response

    NASA Technical Reports Server (NTRS)

    Suk, M.; Choi, K.; Algazi, V. R.

    1976-01-01

    The paper describes a new iterative technique for designing FIR (finite duration impulse response) digital filters using a frequency weighted least squares approximation. The technique is as easy to implement (via FFT) and as effective in two dimensions as in one dimension, and there are virtually no limitations on the class of filter frequency spectra approximated. An adaptive adjustment of the frequency weight to achieve other types of design approximation such as Chebyshev type design is discussed.

  8. The ITER bolometer diagnostic: Status and plansa)

    NASA Astrophysics Data System (ADS)

    Meister, H.; Giannone, L.; Horton, L. D.; Raupp, G.; Zeidner, W.; Grunda, G.; Kalvin, S.; Fischer, U.; Serikov, A.; Stickel, S.; Reichle, R.

    2008-10-01

    A consortium consisting of four EURATOM Associations has been set up to develop the project plan for the full development of the ITER bolometer diagnostic and to continue urgent R&D activities. An overview of the current status is given, including detector development, line-of-sight optimization, performance analysis as well as the design of the diagnostic components and their integration in ITER. This is complemented by the presentation of plans for future activities required to successfully implement the bolometer diagnostic, ranging from the detector development over diagnostic design and prototype testing to RH tools for calibration.

  9. Creation of a 3-dimensional virtual dental patient for computer-guided surgery and CAD-CAM interim complete removable and fixed dental prostheses: A clinical report.

    PubMed

    Harris, Bryan T; Montero, Daniel; Grant, Gerald T; Morton, Dean; Llop, Daniel R; Lin, Wei-Shao

    2017-02-01

    This clinical report proposes a digital workflow using 2-dimensional (2D) digital photographs, a 3D extraoral facial scan, and cone beam computed tomography (CBCT) volumetric data to create a 3D virtual patient with craniofacial hard tissue, remaining dentition (including surrounding intraoral soft tissue), and the realistic appearance of facial soft tissue at an exaggerated smile under static conditions. The 3D virtual patient was used to assist the virtual diagnostic tooth arrangement process, providing patient with a pleasing preoperative virtual smile design that harmonized with facial features. The 3D virtual patient was also used to gain patient's pretreatment approval (as a communication tool), design a prosthetically driven surgical plan for computer-guided implant surgery, and fabricate the computer-aided design and computer-aided manufacturing (CAD-CAM) interim prostheses. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  10. SUMMARY REPORT-FY2006 ITER WORK ACCOMPLISHED

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martovetsky, N N

    2006-04-11

    Six parties (EU, Japan, Russia, US, Korea, China) will build ITER. The US proposed to deliver at least 4 out of 7 modules of the Central Solenoid. Phillip Michael (MIT) and I were tasked by DoE to assist ITER in development of the ITER CS and other magnet systems. We work to help Magnets and Structure division headed by Neil Mitchell. During this visit I worked on the selected items of the CS design and carried out other small tasks, like PF temperature margin assessment.

  11. Iterative LQG Controller Design Through Closed-Loop Identification

    NASA Technical Reports Server (NTRS)

    Hsiao, Min-Hung; Huang, Jen-Kuang; Cox, David E.

    1996-01-01

    This paper presents an iterative Linear Quadratic Gaussian (LQG) controller design approach for a linear stochastic system with an uncertain open-loop model and unknown noise statistics. This approach consists of closed-loop identification and controller redesign cycles. In each cycle, the closed-loop identification method is used to identify an open-loop model and a steady-state Kalman filter gain from closed-loop input/output test data obtained by using a feedback LQG controller designed from the previous cycle. Then the identified open-loop model is used to redesign the state feedback. The state feedback and the identified Kalman filter gain are used to form an updated LQC controller for the next cycle. This iterative process continues until the updated controller converges. The proposed controller design is demonstrated by numerical simulations and experiments on a highly unstable large-gap magnetic suspension system.

  12. Iterative Design and Classroom Evaluation of Automated Formative Feedback for Improving Peer Feedback Localization

    ERIC Educational Resources Information Center

    Nguyen, Huy; Xiong, Wenting; Litman, Diane

    2017-01-01

    A peer-review system that automatically evaluates and provides formative feedback on free-text feedback comments of students was iteratively designed and evaluated in college and high-school classrooms. Classroom assignments required students to write paper drafts and submit them to a peer-review system. When student peers later submitted feedback…

  13. Using an Iterative Mixed-Methods Research Design to Investigate Schools Facing Exceptionally Challenging Circumstances within Trinidad and Tobago

    ERIC Educational Resources Information Center

    De Lisle, Jerome; Seunarinesingh, Krishna; Mohammed, Rhoda; Lee-Piggott, Rinnelle

    2017-01-01

    In this study, methodology and theory were linked to explicate the nature of education practice within schools facing exceptionally challenging circumstances (SFECC) in Trinidad and Tobago. The research design was an iterative quan>QUAL-quan>qual multi-method research programme, consisting of 3 independent projects linked together by overall…

  14. 40 CFR 86.1810-01 - General standards; increase in emissions; unsafe conditions; waivers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 2 and interim non-Tier 2 ethanol fueled vehicles. (a) Any device, system or element of design... “lean-on-cruise” strategies are incorporated into the vehicle design. A “lean-on-cruise” air-fuel... standard. The Administrator may require the manufacturer to provide comparative test data which clearly...

  15. 76 FR 59953 - Designation of Agent To Receive Notification of Claimed Infringement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-28

    ... for comment. The interim regulations have functioned satisfactorily for many years, but issues have... designation of agent using the online template be required, either annually, every two years, or at some other... at least every two years, but the Office invites comment as to the appropriate time period. As is...

  16. Development of performance specifications for collision avoidance systems for lane change, merging, and backing. Task 6, Interim report : testbed systems design and associated facilities

    DOT National Transportation Integrated Search

    1997-05-01

    This report represents the documentation of the design of the testbed. The purposes of the testbed are twofold 1) Establish a foundation for estimating collision avoidance effectiveness and 2) Provide information pertinent to setting performance spec...

  17. 40 CFR 265.442 - Design and installation of new drip pads.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Design and installation of new drip pads. 265.442 Section 265.442 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Drip Pads §...

  18. Final Report on ITER Task Agreement 81-10

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brad J. Merrill

    An International Thermonuclear Experimental Reactor (ITER) Implementing Task Agreement (ITA) on Magnet Safety was established between the ITER International Organization (IO) and the Idaho National Laboratory (INL) Fusion Safety Program (FSP) during calendar year 2004. The objectives of this ITA were to add new capabilities to the MAGARC code and to use this updated version of MAGARC to analyze unmitigated superconductor quench events for both poloidal field (PF) and toroidal field (TF) coils of the ITER design. This report documents the completion of the work scope for this ITA. Based on the results obtained for this ITA, an unmitigated quenchmore » event in an ITER larger PF coil does not appear to be as severe an accident as in an ITER TF coil.« less

  19. Experimental Evidence on Iterated Reasoning in Games

    PubMed Central

    Grehl, Sascha; Tutić, Andreas

    2015-01-01

    We present experimental evidence on two forms of iterated reasoning in games, i.e. backward induction and interactive knowledge. Besides reliable estimates of the cognitive skills of the subjects, our design allows us to disentangle two possible explanations for the observed limits in performed iterated reasoning: Restrictions in subjects’ cognitive abilities and their beliefs concerning the rationality of co-players. In comparison to previous literature, our estimates regarding subjects’ skills in iterated reasoning are quite pessimistic. Also, we find that beliefs concerning the rationality of co-players are completely irrelevant in explaining the observed limited amount of iterated reasoning in the dirty faces game. In addition, it is demonstrated that skills in backward induction are a solid predictor for skills in iterated knowledge, which points to some generalized ability of the subjects in iterated reasoning. PMID:26312486

  20. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...

  1. ITER activities and fusion technology

    NASA Astrophysics Data System (ADS)

    Seki, M.

    2007-10-01

    At the 21st IAEA Fusion Energy Conference, 68 and 67 papers were presented in the categories of ITER activities and fusion technology, respectively. ITER performance prediction, results of technology R&D and the construction preparation provide good confidence in ITER realization. The superconducting tokamak EAST achieved the first plasma just before the conference. The construction of other new experimental machines has also shown steady progress. Future reactor studies stress the importance of down sizing and a steady-state approach. Reactor technology in the field of blanket including the ITER TBM programme and materials for the demonstration power plant showed sound progress in both R&D and design activities.

  2. 76 FR 17160 - Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ...The NRC staff is issuing its Final Interim Staff Guidance (ISG) DC/COL-ISG-021 titled ``Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' Agencywide Documents Access and Management System (ADAMS) Accession No. ML102510119 for DC/ COL-ISG-021 and ADAMS Accession No. ML102510164 for Attachment 1 to DC/ COL-ISG-021. This ISG provides new guidance for applicants submitting a combined license (COL) or design certification (DC) application for new nuclear power reactors under Title 10 of the Code of Federal Regulations, part 52. In addition, it supplements the guidance provided to the NRC staff in NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' March 2007, Standard Review Plan (SRP), Section 8.3.1 and Sections 9.5.4 through 9.5.8. The NRC staff issues DC/COL-ISGs to facilitate activities associated with NRC review of applications for DCs and COLs. The NRC staff intends to incorporate DC/COL-ISG-021 into the next revision of SRP Section 8.3.1 and Sections 9.5.4 through 9.5.8 and Regulatory Guide 1.206, ``Combined License Applications for Nuclear Power Plants (LWR Edition),'' June 2007. Disposition: On February 3, 2010, the NRC staff issued proposed DC/ COL-ISG-021 on ``Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' ADAMS Accession No. ML092640035. The NRC staff received comments on the proposed guidance. This final issuance resolves the majority of the comments. The NRC staff responses to these comments can be found in ADAMS Accession No. ML102510176.

  3. Two-stage phase II oncology designs using short-term endpoints for early stopping.

    PubMed

    Kunz, Cornelia U; Wason, James Ms; Kieser, Meinhard

    2017-08-01

    Phase II oncology trials are conducted to evaluate whether the tumour activity of a new treatment is promising enough to warrant further investigation. The most commonly used approach in this context is a two-stage single-arm design with binary endpoint. As for all designs with interim analysis, its efficiency strongly depends on the relation between recruitment rate and follow-up time required to measure the patients' outcomes. Usually, recruitment is postponed after the sample size of the first stage is achieved up until the outcomes of all patients are available. This may lead to a considerable increase of the trial length and with it to a delay in the drug development process. We propose a design where an intermediate endpoint is used in the interim analysis to decide whether or not the study is continued with a second stage. Optimal and minimax versions of this design are derived. The characteristics of the proposed design in terms of type I error rate, power, maximum and expected sample size as well as trial duration are investigated. Guidance is given on how to select the most appropriate design. Application is illustrated by a phase II oncology trial in patients with advanced angiosarcoma, which motivated this research.

  4. ITER Disruption Mitigation System Design

    NASA Astrophysics Data System (ADS)

    Rasmussen, David; Lyttle, M. S.; Baylor, L. R.; Carmichael, J. R.; Caughman, J. B. O.; Combs, S. K.; Ericson, N. M.; Bull-Ezell, N. D.; Fehling, D. T.; Fisher, P. W.; Foust, C. R.; Ha, T.; Meitner, S. J.; Nycz, A.; Shoulders, J. M.; Smith, S. F.; Warmack, R. J.; Coburn, J. D.; Gebhart, T. E.; Fisher, J. T.; Reed, J. R.; Younkin, T. R.

    2015-11-01

    The disruption mitigation system for ITER is under design and will require injection of up to 10 kPa-m3 of deuterium, helium, neon, or argon material for thermal mitigation and up to 100 kPa-m3 of material for suppression of runaway electrons. A hybrid unit compatible with the ITER nuclear, thermal and magnetic field environment is being developed. The unit incorporates a fast gas valve for massive gas injection (MGI) and a shattered pellet injector (SPI) to inject a massive spray of small particles, and can be operated as an SPI with a frozen pellet or an MGI without a pellet. Three ITER upper port locations will have three SPI/MGI units with a common delivery tube. One equatorial port location has space for sixteen similar SPI/MGI units. Supported by US DOE under DE-AC05-00OR22725.

  5. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  6. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  7. Architectural Specialization for Inter-Iteration Loop Dependence Patterns

    DTIC Science & Technology

    2015-10-01

    Architectural Specialization for Inter-Iteration Loop Dependence Patterns Christopher Batten Computer Systems Laboratory School of Electrical and...Trends in Computer Architecture Transistors (Thousands) Frequency (MHz) Typical Power (W) MIPS R2K Intel P4 DEC Alpha 21264 Data collected by M...T as ks p er Jo ule ) Simple Processor Design Power Constraint High-Performance Architectures Embedded Architectures Design Performance

  8. VIMOS Instrument Control Software Design: an Object Oriented Approach

    NASA Astrophysics Data System (ADS)

    Brau-Nogué, Sylvie; Lucuix, Christian

    2002-12-01

    The Franco-Italian VIMOS instrument is a VIsible imaging Multi-Object Spectrograph with outstanding multiplex capabilities, allowing to take spectra of more than 800 objects simultaneously, or integral field spectroscopy mode in a 54x54 arcsec area. VIMOS is being installed at the Nasmyth focus of the third Unit Telescope of the European Southern Observatory Very Large Telescope (VLT) at Mount Paranal in Chile. This paper will describe the analysis, the design and the implementation of the VIMOS Instrument Control System, using UML notation. Our Control group followed an Object Oriented software process while keeping in mind the ESO VLT standard control concepts. At ESO VLT a complete software library is available. Rather than applying waterfall lifecycle, ICS project used iterative development, a lifecycle consisting of several iterations. Each iteration consisted in : capture and evaluate the requirements, visual modeling for analysis and design, implementation, test, and deployment. Depending of the project phases, iterations focused more or less on specific activity. The result is an object model (the design model), including use-case realizations. An implementation view and a deployment view complement this product. An extract of VIMOS ICS UML model will be presented and some implementation, integration and test issues will be discussed.

  9. Layout compliance for triple patterning lithography: an iterative approach

    NASA Astrophysics Data System (ADS)

    Yu, Bei; Garreton, Gilda; Pan, David Z.

    2014-10-01

    As the semiconductor process further scales down, the industry encounters many lithography-related issues. In the 14nm logic node and beyond, triple patterning lithography (TPL) is one of the most promising techniques for Metal1 layer and possibly Via0 layer. As one of the most challenging problems in TPL, recently layout decomposition efforts have received more attention from both industry and academia. Ideally the decomposer should point out locations in the layout that are not triple patterning decomposable and therefore manual intervention by designers is required. A traditional decomposition flow would be an iterative process, where each iteration consists of an automatic layout decomposition step and manual layout modification task. However, due to the NP-hardness of triple patterning layout decomposition, automatic full chip level layout decomposition requires long computational time and therefore design closure issues continue to linger around in the traditional flow. Challenged by this issue, we present a novel incremental layout decomposition framework to facilitate accelerated iterative decomposition. In the first iteration, our decomposer not only points out all conflicts, but also provides the suggestions to fix them. After the layout modification, instead of solving the full chip problem from scratch, our decomposer can provide a quick solution for a selected portion of layout. We believe this framework is efficient, in terms of performance and designer friendly.

  10. Conceptual design of data acquisition and control system for two Rf driver based negative ion source for fusion R&D

    NASA Astrophysics Data System (ADS)

    Soni, Jigensh; Yadav, R. K.; Patel, A.; Gahlaut, A.; Mistry, H.; Parmar, K. G.; Mahesh, V.; Parmar, D.; Prajapati, B.; Singh, M. J.; Bandyopadhyay, M.; Bansal, G.; Pandya, K.; Chakraborty, A.

    2013-02-01

    Twin Source - An Inductively coupled two RF driver based 180 kW, 1 MHz negative ion source experimental setup is initiated at IPR, Gandhinagar, under Indian program, with the objective of understanding the physics and technology of multi-driver coupling. Twin Source [1] (TS) also provides an intermediate platform between operational ROBIN [2] [5] and eight RF drivers based Indian test facility -INTF [3]. A twin source experiment requires a central system to provide control, data acquisition and communication interface, referred as TS-CODAC, for which a software architecture similar to ITER CODAC core system has been decided for implementation. The Core System is a software suite for ITER plant system manufacturers to use as a template for the development of their interface with CODAC. The ITER approach, in terms of technology, has been adopted for the TS-CODAC so as to develop necessary expertise for developing and operating a control system based on the ITER guidelines as similar configuration needs to be implemented for the INTF. This cost effective approach will provide an opportunity to evaluate and learn ITER CODAC technology, documentation, information technology and control system processes, on an operational machine. Conceptual design of the TS-CODAC system has been completed. For complete control of the system, approximately 200 Nos. control signals and 152 acquisition signals are needed. In TS-CODAC, control loop time required is within the range of 5ms - 10 ms, therefore for the control system, PLC (Siemens S-7 400) has been chosen as suggested in the ITER slow controller catalog. For the data acquisition, the maximum sampling interval required is 100 micro second, and therefore National Instruments (NI) PXIe system and NI 6259 digitizer cards have been selected as suggested in the ITER fast controller catalog. This paper will present conceptual design of TS -CODAC system based on ITER CODAC Core software and applicable plant system integration processes.

  11. 75 FR 65349 - Decision To Evaluate a Petition To Designate a Class of Employees From BWX Technologies Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ...: Lynchburg, Virginia. Job Titles and/or Job Duties: All Atomic Weapons Employer employees. Period of..., Interim Director, Division of Compensation Analysis and Support, National Institute for Occupational...

  12. 75 FR 4822 - Decision To Evaluate a Petition To Designate a Class of Employees for the Lawrence Livermore...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ...: Lawrence Livermore National Laboratory. Location: Livermore, California. Job Titles and/or Job Duties: All... L. Hinnefeld, Interim Director, Office of Compensation Analysis and Support, National Institute for...

  13. Louisiana experimental base project : interim report No. 1.

    DOT National Transportation Integrated Search

    1979-11-01

    The Louisiana Experimental Base Project is a research study evaluating the design/performance characteristics of three types of base courses as incorporated into comparable flexible pavement systems on a full-scale test road. Fourteen different test ...

  14. DEET

    MedlinePlus

    ... of designated critical habitat for all currently registered uses of DEET. EPA issued an Interim Decision for DEET in September 2014. We concluded that: no additional data are required at this time; and no changes to the affected registrations or their labeling are ...

  15. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...

  16. Gaussian-Beam/Physical-Optics Design Of Beam Waveguide

    NASA Technical Reports Server (NTRS)

    Veruttipong, Watt; Chen, Jacqueline C.; Bathker, Dan A.

    1993-01-01

    In iterative method of designing wideband beam-waveguide feed for paraboloidal-reflector antenna, Gaussian-beam approximation alternated with more nearly exact physical-optics analysis of diffraction. Includes curved and straight reflectors guiding radiation from feed horn to subreflector. For iterative design calculations, curved mirrors mathematically modeled as thin lenses. Each distance Li is combined length of two straight-line segments intersecting at one of flat mirrors. Method useful for designing beam-waveguide reflectors or mirrors required to have diameters approximately less than 30 wavelengths at one or more intended operating frequencies.

  17. Probabilistic distance-based quantizer design for distributed estimation

    NASA Astrophysics Data System (ADS)

    Kim, Yoon Hak

    2016-12-01

    We consider an iterative design of independently operating local quantizers at nodes that should cooperate without interaction to achieve application objectives for distributed estimation systems. We suggest as a new cost function a probabilistic distance between the posterior distribution and its quantized one expressed as the Kullback Leibler (KL) divergence. We first present the analysis that minimizing the KL divergence in the cyclic generalized Lloyd design framework is equivalent to maximizing the logarithmic quantized posterior distribution on the average which can be further computationally reduced in our iterative design. We propose an iterative design algorithm that seeks to maximize the simplified version of the posterior quantized distribution and discuss that our algorithm converges to a global optimum due to the convexity of the cost function and generates the most informative quantized measurements. We also provide an independent encoding technique that enables minimization of the cost function and can be efficiently simplified for a practical use of power-constrained nodes. We finally demonstrate through extensive experiments an obvious advantage of improved estimation performance as compared with the typical designs and the novel design techniques previously published.

  18. Too Little Too Soon? Modeling the Risks of Spiral Development

    DTIC Science & Technology

    2007-04-30

    270 315 360 405 450 495 540 585 630 675 720 765 810 855 900 Time (Week) Work started and active PhIt [Requirements,Iter1] : JavelinCalibration work...packages1 1 1 Work started and active PhIt [Technology,Iter1] : JavelinCalibration work packages2 2 2 Work started and active PhIt [Design,Iter1...JavelinCalibration work packages3 3 3 3 Work started and active PhIt [Manufacturing,Iter1] : JavelinCalibration work packages4 4 Work started and active PhIt

  19. Application of a repetitive process setting to design of monotonically convergent iterative learning control

    NASA Astrophysics Data System (ADS)

    Boski, Marcin; Paszke, Wojciech

    2015-11-01

    This paper deals with the problem of designing an iterative learning control algorithm for discrete linear systems using repetitive process stability theory. The resulting design produces a stabilizing output feedback controller in the time domain and a feedforward controller that guarantees monotonic convergence in the trial-to-trial domain. The results are also extended to limited frequency range design specification. New design procedure is introduced in terms of linear matrix inequality (LMI) representations, which guarantee the prescribed performances of ILC scheme. A simulation example is given to illustrate the theoretical developments.

  20. 46 CFR 147A.9 - Persons in charge of fumigation and the vessel; designation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Persons in charge of fumigation and the vessel; designation. 147A.9 Section 147A.9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.9 Persons in charge of fumigation and...

  1. 46 CFR 147A.9 - Persons in charge of fumigation and the vessel; designation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Persons in charge of fumigation and the vessel; designation. 147A.9 Section 147A.9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.9 Persons in charge of fumigation and...

  2. 46 CFR 147A.9 - Persons in charge of fumigation and the vessel; designation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Persons in charge of fumigation and the vessel; designation. 147A.9 Section 147A.9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.9 Persons in charge of fumigation and...

  3. 46 CFR 147A.9 - Persons in charge of fumigation and the vessel; designation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Persons in charge of fumigation and the vessel; designation. 147A.9 Section 147A.9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.9 Persons in charge of fumigation and...

  4. 46 CFR 147A.9 - Persons in charge of fumigation and the vessel; designation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Persons in charge of fumigation and the vessel; designation. 147A.9 Section 147A.9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.9 Persons in charge of fumigation and...

  5. Effectiveness Of The Individual Riflemen In An Infantry Squad

    DTIC Science & Technology

    2017-12-01

    adversaries. 14. SUBJECT TERMS individual carbine, interim combat service rifle, squad designated marksman rifle, commercial- off-the-shelf...7 5th–95th Percentile. Source: El Creative Advertising and Design (2007...but does not have overwhelming firepower compared to enemy infantry supported by an armored or 4 motorized assets (DA, 2006b). In order to achieve

  6. Evaluation of Worker Profiling and Reemployment Services Systems: Interim Report. Unemployment Insurance Occasional Paper 96-1.

    ERIC Educational Resources Information Center

    Hawkins, Evelyn K.; And Others

    The Evaluation of Worker Profiling and Reemployment Services (WPRS) systems was designed to provide the U.S. Department of Labor information on how states are designing, implementing, and operating their worker profiling and reemployment services systems for dislocated workers and to compare the effectiveness of different state approaches to…

  7. A modified varying-stage adaptive phase II/III clinical trial design.

    PubMed

    Dong, Gaohong; Vandemeulebroecke, Marc

    2016-07-01

    Conventionally, adaptive phase II/III clinical trials are carried out with a strict two-stage design. Recently, a varying-stage adaptive phase II/III clinical trial design has been developed. In this design, following the first stage, an intermediate stage can be adaptively added to obtain more data, so that a more informative decision can be made. Therefore, the number of further investigational stages is determined based upon data accumulated to the interim analysis. This design considers two plausible study endpoints, with one of them initially designated as the primary endpoint. Based on interim results, another endpoint can be switched as the primary endpoint. However, in many therapeutic areas, the primary study endpoint is well established. Therefore, we modify this design to consider one study endpoint only so that it may be more readily applicable in real clinical trial designs. Our simulations show that, the same as the original design, this modified design controls the Type I error rate, and the design parameters such as the threshold probability for the two-stage setting and the alpha allocation ratio in the two-stage setting versus the three-stage setting have a great impact on the design characteristics. However, this modified design requires a larger sample size for the initial stage, and the probability of futility becomes much higher when the threshold probability for the two-stage setting gets smaller. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  8. On the Implementation of Iterative Detection in Real-World MIMO Wireless Systems

    DTIC Science & Technology

    2003-12-01

    multientr~es et multisorties (MIMO) permettent une exploitation remarquable du spectre comparativement aux syst~mes traditionnels A antenne unique...vecteurs symboliques pilotes connus cause une perte de rendement n~gligeable comparativement au cas hypothdtique des connaissances des voies parfaites...useful design guidelines for iterative systems. it does not provide any fundamental understanding as to how the design of the detector can improve the

  9. 75 FR 58390 - Decision To Evaluate a Petition To Designate a Class of Employees From the Vitro Manufacturing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Manufacturing. Location: Canonsburg, Pennsylvania. Job Titles and/or Job Duties: All employees who worked in any...: Stuart L. Hinnefeld, Interim Director, Division of Compensation Analysis and Support, National Institute...

  10. 75 FR 24957 - Decision to Evaluate a Petition to Designate a Class of Employees From BWX Technologies Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    .... Job Titles and/or Job Duties: All Atomic Weapons Employer employees. Period of Employment: January 1... INFORMATION CONTACT: Stuart L. Hinnefeld, Interim Director, Division of Compensation Analysis and Support...

  11. 75 FR 22409 - Decision To Evaluate a Petition To Designate a Class of Employees From the Sandia National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    .... Location: Albuquerque, New Mexico. Job Titles and/or Job Duties: All employees who worked within the... CONTACT: Stuart L. Hinnefeld, Interim Director, Division of Compensation Analysis and Support, National...

  12. 40 CFR 745.83 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with the manufacturer's instructions. Interim controls means a set of measures designed to temporarily... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED... disposable cleaning cloths with the card, whether post-renovation cleaning has been properly completed...

  13. 40 CFR 745.83 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with the manufacturer's instructions. Interim controls means a set of measures designed to temporarily... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED... disposable cleaning cloths with the card, whether post-renovation cleaning has been properly completed...

  14. 40 CFR 745.83 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with the manufacturer's instructions. Interim controls means a set of measures designed to temporarily... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED... disposable cleaning cloths with the card, whether post-renovation cleaning has been properly completed...

  15. Marine Natural Product Chemistry and the Interim: A Novel Approach

    ERIC Educational Resources Information Center

    Bland, Jeffrey S.; Medcalf, Darrell G.

    1974-01-01

    Describes a course designed to strengthen a student's background in organic chemistry, demonstrate the interfacing of chemistry and biology, expose undergraduates to graduate research, provide familiarity with instrumentation, and provide a novel field experience. (Author/GS)

  16. GUIDE TO CONDUCTING TREATABILITY STUDIES UNDER CERCLA: SOIL WASHING - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and Liab...

  17. Evaluation of joint sealant materials : interim report No. 1.

    DOT National Transportation Integrated Search

    1972-03-01

    This report illustrates some of the problems caused by ineffectively sealed joints and points to the great need for properly sealing joints in both concrete pavements and structures. : The principles of design including slab lengths, joint dimensions...

  18. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: SOLVENT EXTRACTION - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation and Liabi...

  19. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: THERMAL DESORPTION - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and Liab...

  20. Status of the ITER Electron Cyclotron Heating and Current Drive System

    NASA Astrophysics Data System (ADS)

    Darbos, Caroline; Albajar, Ferran; Bonicelli, Tullio; Carannante, Giuseppe; Cavinato, Mario; Cismondi, Fabio; Denisov, Grigory; Farina, Daniela; Gagliardi, Mario; Gandini, Franco; Gassmann, Thibault; Goodman, Timothy; Hanson, Gregory; Henderson, Mark A.; Kajiwara, Ken; McElhaney, Karen; Nousiainen, Risto; Oda, Yasuhisa; Omori, Toshimichi; Oustinov, Alexander; Parmar, Darshankumar; Popov, Vladimir L.; Purohit, Dharmesh; Rao, Shambhu Laxmikanth; Rasmussen, David; Rathod, Vipal; Ronden, Dennis M. S.; Saibene, Gabriella; Sakamoto, Keishi; Sartori, Filippo; Scherer, Theo; Singh, Narinder Pal; Strauß, Dirk; Takahashi, Koji

    2016-01-01

    The electron cyclotron (EC) heating and current drive (H&CD) system developed for the ITER is made of 12 sets of high-voltage power supplies feeding 24 gyrotrons connected through 24 transmission lines (TL), to five launchers, four located in upper ports and one at the equatorial level. Nearly all procurements are in-kind, following general ITER philosophy, and will come from Europe, India, Japan, Russia and the USA. The full system is designed to couple to the plasma 20 MW among the 24 MW generated power, at the frequency of 170 GHz, for various physics applications such as plasma start-up, central H&CD and magnetohydrodynamic (MHD) activity control. The design takes present day technology and extends toward high-power continuous operation, which represents a large step forward as compared to the present state of the art. The ITER EC system will be a stepping stone to future EC systems for DEMO and beyond.

  1. Low-temperature tensile strength of the ITER-TF model coil insulation system after reactor irradiation

    NASA Astrophysics Data System (ADS)

    Bittner-Rohrhofer, K.; Humer, K.; Weber, H. W.

    The windings of the superconducting magnet coils for the ITER-FEAT fusion device are affected by high mechanical stresses at cryogenic temperatures and by a radiation environment, which impose certain constraints especially on the insulating materials. A glass fiber reinforced plastic (GFRP) laminate, which consists of Kapton/R-glass-fiber reinforcement tapes, vacuum-impregnated in a DGEBA epoxy system, was used for the European toroidal field model coil turn insulation of ITER. In order to assess its mechanical properties under the actual operating conditions of ITER-FEAT, cryogenic (77 K) static tensile tests and tension-tension fatigue measurements were done before and after irradiation to a fast neutron fluence of 1×10 22 m -2 ( E>0.1 MeV), i.e. the ITER-FEAT design fluence level. We find that the mechanical strength and the fracture behavior of this GFRP are strongly influenced by the winding direction of the tape and by the radiation induced delamination process. In addition, the composite swells by 3%, forming bubbles inside the laminate, and loses weight (1.4%) at the design fluence.

  2. Aerodynamic Optimization of Rocket Control Surface Geometry Using Cartesian Methods and CAD Geometry

    NASA Technical Reports Server (NTRS)

    Nelson, Andrea; Aftosmis, Michael J.; Nemec, Marian; Pulliam, Thomas H.

    2004-01-01

    Aerodynamic design is an iterative process involving geometry manipulation and complex computational analysis subject to physical constraints and aerodynamic objectives. A design cycle consists of first establishing the performance of a baseline design, which is usually created with low-fidelity engineering tools, and then progressively optimizing the design to maximize its performance. Optimization techniques have evolved from relying exclusively on designer intuition and insight in traditional trial and error methods, to sophisticated local and global search methods. Recent attempts at automating the search through a large design space with formal optimization methods include both database driven and direct evaluation schemes. Databases are being used in conjunction with surrogate and neural network models as a basis on which to run optimization algorithms. Optimization algorithms are also being driven by the direct evaluation of objectives and constraints using high-fidelity simulations. Surrogate methods use data points obtained from simulations, and possibly gradients evaluated at the data points, to create mathematical approximations of a database. Neural network models work in a similar fashion, using a number of high-fidelity database calculations as training iterations to create a database model. Optimal designs are obtained by coupling an optimization algorithm to the database model. Evaluation of the current best design then gives either a new local optima and/or increases the fidelity of the approximation model for the next iteration. Surrogate methods have also been developed that iterate on the selection of data points to decrease the uncertainty of the approximation model prior to searching for an optimal design. The database approximation models for each of these cases, however, become computationally expensive with increase in dimensionality. Thus the method of using optimization algorithms to search a database model becomes problematic as the number of design variables is increased.

  3. Maximum inflation of the type 1 error rate when sample size and allocation rate are adapted in a pre-planned interim look.

    PubMed

    Graf, Alexandra C; Bauer, Peter

    2011-06-30

    We calculate the maximum type 1 error rate of the pre-planned conventional fixed sample size test for comparing the means of independent normal distributions (with common known variance) which can be yielded when sample size and allocation rate to the treatment arms can be modified in an interim analysis. Thereby it is assumed that the experimenter fully exploits knowledge of the unblinded interim estimates of the treatment effects in order to maximize the conditional type 1 error rate. The 'worst-case' strategies require knowledge of the unknown common treatment effect under the null hypothesis. Although this is a rather hypothetical scenario it may be approached in practice when using a standard control treatment for which precise estimates are available from historical data. The maximum inflation of the type 1 error rate is substantially larger than derived by Proschan and Hunsberger (Biometrics 1995; 51:1315-1324) for design modifications applying balanced samples before and after the interim analysis. Corresponding upper limits for the maximum type 1 error rate are calculated for a number of situations arising from practical considerations (e.g. restricting the maximum sample size, not allowing sample size to decrease, allowing only increase in the sample size in the experimental treatment). The application is discussed for a motivating example. Copyright © 2011 John Wiley & Sons, Ltd.

  4. Sample size re-assessment leading to a raised sample size does not inflate type I error rate under mild conditions.

    PubMed

    Broberg, Per

    2013-07-19

    One major concern with adaptive designs, such as the sample size adjustable designs, has been the fear of inflating the type I error rate. In (Stat Med 23:1023-1038, 2004) it is however proven that when observations follow a normal distribution and the interim result show promise, meaning that the conditional power exceeds 50%, type I error rate is protected. This bound and the distributional assumptions may seem to impose undesirable restrictions on the use of these designs. In (Stat Med 30:3267-3284, 2011) the possibility of going below 50% is explored and a region that permits an increased sample size without inflation is defined in terms of the conditional power at the interim. A criterion which is implicit in (Stat Med 30:3267-3284, 2011) is derived by elementary methods and expressed in terms of the test statistic at the interim to simplify practical use. Mathematical and computational details concerning this criterion are exhibited. Under very general conditions the type I error rate is preserved under sample size adjustable schemes that permit a raise. The main result states that for normally distributed observations raising the sample size when the result looks promising, where the definition of promising depends on the amount of knowledge gathered so far, guarantees the protection of the type I error rate. Also, in the many situations where the test statistic approximately follows a normal law, the deviation from the main result remains negligible. This article provides details regarding the Weibull and binomial distributions and indicates how one may approach these distributions within the current setting. There is thus reason to consider such designs more often, since they offer a means of adjusting an important design feature at little or no cost in terms of error rate.

  5. Development of a mirror-based endoscope for divertor spectroscopy on JET with the new ITER-like wall (invited).

    PubMed

    Huber, A; Brezinsek, S; Mertens, Ph; Schweer, B; Sergienko, G; Terra, A; Arnoux, G; Balshaw, N; Clever, M; Edlingdon, T; Egner, S; Farthing, J; Hartl, M; Horton, L; Kampf, D; Klammer, J; Lambertz, H T; Matthews, G F; Morlock, C; Murari, A; Reindl, M; Riccardo, V; Samm, U; Sanders, S; Stamp, M; Williams, J; Zastrow, K D; Zauner, C

    2012-10-01

    A new endoscope with optimised divertor view has been developed in order to survey and monitor the emission of specific impurities such as tungsten and the remaining carbon as well as beryllium in the tungsten divertor of JET after the implementation of the ITER-like wall in 2011. The endoscope is a prototype for testing an ITER relevant design concept based on reflective optics only. It may be subject to high neutron fluxes as expected in ITER. The operating wavelength range, from 390 nm to 2500 nm, allows the measurements of the emission of all expected impurities (W I, Be II, C I, C II, C III) with high optical transmittance (≥ 30% in the designed wavelength range) as well as high spatial resolution that is ≤ 2 mm at the object plane and ≤ 3 mm for the full depth of field (± 0.7 m). The new optical design includes options for in situ calibration of the endoscope transmittance during the experimental campaign, which allows the continuous tracing of possible transmittance degradation with time due to impurity deposition and erosion by fast neutral particles. In parallel to the new optical design, a new type of possibly ITER relevant shutter system based on pneumatic techniques has been developed and integrated into the endoscope head. The endoscope is equipped with four digital CCD cameras, each combined with two filter wheels for narrow band interference and neutral density filters. Additionally, two protection cameras in the λ > 0.95 μm range have been integrated in the optical design for the real time wall protection during the plasma operation of JET.

  6. Numerical analysis of modified Central Solenoid insert design

    DOE PAGES

    Khodak, Andrei; Martovetsky, Nicolai; Smirnov, Aleksandre; ...

    2015-06-21

    The United States ITER Project Office (USIPO) is responsible for fabrication of the Central Solenoid (CS) for ITER project. The ITER machine is currently under construction by seven parties in Cadarache, France. The CS Insert (CSI) project should provide a verification of the conductor performance in relevant conditions of temperature, field, currents and mechanical strain. The US IPO designed the CSI that will be tested at the Central Solenoid Model Coil (CSMC) Test Facility at JAEA, Naka. To validate the modified design we performed three-dimensional numerical simulations using coupled solver for simultaneous structural, thermal and electromagnetic analysis. Thermal and electromagneticmore » simulations supported structural calculations providing necessary loads and strains. According to current analysis design of the modified coil satisfies ITER magnet structural design criteria for the following conditions: (1) room temperature, no current, (2) temperature 4K, no current, (3) temperature 4K, current 60 kA direct charge, and (4) temperature 4K, current 60 kA reverse charge. Fatigue life assessment analysis is performed for the alternating conditions of: temperature 4K, no current, and temperature 4K, current 45 kA direct charge. Results of fatigue analysis show that parts of the coil assembly can be qualified for up to 1 million cycles. Distributions of the Current Sharing Temperature (TCS) in the superconductor were obtained from numerical results using parameterization of the critical surface in the form similar to that proposed for ITER. Lastly, special ADPL scripts were developed for ANSYS allowing one-dimensional representation of TCS along the cable, as well as three-dimensional fields of TCS in superconductor material. Published by Elsevier B.V.« less

  7. Development of a mirror-based endoscope for divertor spectroscopy on JET with the new ITER-like wall (invited)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huber, A.; Brezinsek, S.; Mertens, Ph.

    2012-10-15

    A new endoscope with optimised divertor view has been developed in order to survey and monitor the emission of specific impurities such as tungsten and the remaining carbon as well as beryllium in the tungsten divertor of JET after the implementation of the ITER-like wall in 2011. The endoscope is a prototype for testing an ITER relevant design concept based on reflective optics only. It may be subject to high neutron fluxes as expected in ITER. The operating wavelength range, from 390 nm to 2500 nm, allows the measurements of the emission of all expected impurities (W I, Be II,more » C I, C II, C III) with high optical transmittance ({>=}30% in the designed wavelength range) as well as high spatial resolution that is {<=}2 mm at the object plane and {<=}3 mm for the full depth of field ({+-}0.7 m). The new optical design includes options for in situ calibration of the endoscope transmittance during the experimental campaign, which allows the continuous tracing of possible transmittance degradation with time due to impurity deposition and erosion by fast neutral particles. In parallel to the new optical design, a new type of possibly ITER relevant shutter system based on pneumatic techniques has been developed and integrated into the endoscope head. The endoscope is equipped with four digital CCD cameras, each combined with two filter wheels for narrow band interference and neutral density filters. Additionally, two protection cameras in the {lambda} > 0.95 {mu}m range have been integrated in the optical design for the real time wall protection during the plasma operation of JET.« less

  8. Status of the 1 MeV Accelerator Design for ITER NBI

    NASA Astrophysics Data System (ADS)

    Kuriyama, M.; Boilson, D.; Hemsworth, R.; Svensson, L.; Graceffa, J.; Schunke, B.; Decamps, H.; Tanaka, M.; Bonicelli, T.; Masiello, A.; Bigi, M.; Chitarin, G.; Luchetta, A.; Marcuzzi, D.; Pasqualotto, R.; Pomaro, N.; Serianni, G.; Sonato, P.; Toigo, V.; Zaccaria, P.; Kraus, W.; Franzen, P.; Heinemann, B.; Inoue, T.; Watanabe, K.; Kashiwagi, M.; Taniguchi, M.; Tobari, H.; De Esch, H.

    2011-09-01

    The beam source of neutral beam heating/current drive system for ITER is needed to accelerate the negative ion beam of 40A with D- at 1 MeV for 3600 sec. In order to realize the beam source, design and R&D works are being developed in many institutions under the coordination of ITER organization. The development of the key issues of the ion source including source plasma uniformity, suppression of co-extracted electron in D beam operation and also after the long beam duration time of over a few 100 sec, is progressed mainly in IPP with the facilities of BATMAN, MANITU and RADI. In the near future, ELISE, that will be tested the half size of the ITER ion source, will start the operation in 2011, and then SPIDER, which demonstrates negative ion production and extraction with the same size and same structure as the ITER ion source, will start the operation in 2014 as part of the NBTF. The development of the accelerator is progressed mainly in JAEA with the MeV test facility, and also the computer simulation of beam optics also developed in JAEA, CEA and RFX. The full ITER heating and current drive beam performance will be demonstrated in MITICA, which will start operation in 2016 as part of the NBTF.

  9. Iterative Neighbour-Information Gathering for Ranking Nodes in Complex Networks

    NASA Astrophysics Data System (ADS)

    Xu, Shuang; Wang, Pei; Lü, Jinhu

    2017-01-01

    Designing node influence ranking algorithms can provide insights into network dynamics, functions and structures. Increasingly evidences reveal that node’s spreading ability largely depends on its neighbours. We introduce an iterative neighbourinformation gathering (Ing) process with three parameters, including a transformation matrix, a priori information and an iteration time. The Ing process iteratively combines priori information from neighbours via the transformation matrix, and iteratively assigns an Ing score to each node to evaluate its influence. The algorithm appropriates for any types of networks, and includes some traditional centralities as special cases, such as degree, semi-local, LeaderRank. The Ing process converges in strongly connected networks with speed relying on the first two largest eigenvalues of the transformation matrix. Interestingly, the eigenvector centrality corresponds to a limit case of the algorithm. By comparing with eight renowned centralities, simulations of susceptible-infected-removed (SIR) model on real-world networks reveal that the Ing can offer more exact rankings, even without a priori information. We also observe that an optimal iteration time is always in existence to realize best characterizing of node influence. The proposed algorithms bridge the gaps among some existing measures, and may have potential applications in infectious disease control, designing of optimal information spreading strategies.

  10. Radiofrequency pulse design using nonlinear gradient magnetic fields.

    PubMed

    Kopanoglu, Emre; Constable, R Todd

    2015-09-01

    An iterative k-space trajectory and radiofrequency (RF) pulse design method is proposed for excitation using nonlinear gradient magnetic fields. The spatial encoding functions (SEFs) generated by nonlinear gradient fields are linearly dependent in Cartesian coordinates. Left uncorrected, this may lead to flip angle variations in excitation profiles. In the proposed method, SEFs (k-space samples) are selected using a matching pursuit algorithm, and the RF pulse is designed using a conjugate gradient algorithm. Three variants of the proposed approach are given: the full algorithm, a computationally cheaper version, and a third version for designing spoke-based trajectories. The method is demonstrated for various target excitation profiles using simulations and phantom experiments. The method is compared with other iterative (matching pursuit and conjugate gradient) and noniterative (coordinate-transformation and Jacobian-based) pulse design methods as well as uniform density spiral and EPI trajectories. The results show that the proposed method can increase excitation fidelity. An iterative method for designing k-space trajectories and RF pulses using nonlinear gradient fields is proposed. The method can either be used for selecting the SEFs individually to guide trajectory design, or can be adapted to design and optimize specific trajectories of interest. © 2014 Wiley Periodicals, Inc.

  11. Long-pulse stability limits of the ITER baseline scenario

    DOE PAGES

    Jackson, G. L.; Luce, T. C.; Solomon, W. M.; ...

    2015-01-14

    DIII-D has made significant progress in developing the techniques required to operate ITER, and in understanding their impact on performance when integrated into operational scenarios at ITER relevant parameters. We demonstrated long duration plasmas, stable to m/n =2/1 tearing modes (TMs), with an ITER similar shape and I p/aB T, in DIII-D, that evolve to stationary conditions. The operating region most likely to reach stable conditions has normalized pressure, B N≈1.9–2.1 (compared to the ITER baseline design of 1.6 – 1.8), and a Greenwald normalized density fraction, f GW 0.42 – 0.70 (the ITER design is f GW ≈ 0.8).more » The evolution of the current profile, using internal inductance (l i) as an indicator, is found to produce a smaller fraction of stable pulses when l i is increased above ≈ 1.1 at the beginning of β N flattop. Stable discharges with co-neutral beam injection (NBI) are generally accompanied with a benign n=2 MHD mode. However if this mode exceeds ≈ 10 G, the onset of a m/n=2/1 tearing mode occurs with a loss of confinement. In addition, stable operation with low applied external torque, at or below the extrapolated value expected for ITER has also been demonstrated. With electron cyclotron (EC) injection, the operating region of stable discharges has been further extended at ITER equivalent levels of torque and to ELM free discharges at higher torque but with the addition of an n=3 magnetic perturbation from the DIII-D internal coil set. Lastly, the characterization of the ITER baseline scenario evolution for long pulse duration, extension to more ITER relevant values of torque and electron heating, and suppression of ELMs have significantly advanced the physics basis of this scenario, although significant effort remains in the simultaneous integration of all these requirements.« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henning, C.

    This report contains papers on the following topics: conceptual design; radiation damage of ITER magnet systems; insulation system of the magnets; critical current density and strain sensitivity; toroidal field coil structural analysis; stress analysis for the ITER central solenoid; and volt-second capabilities and PF magnet configurations.

  13. Abradable compressor and turbine seals, volume 1. [for turbofan engines

    NASA Technical Reports Server (NTRS)

    Sundberg, D. V.; Dennis, R. E.; Hurst, L. G.

    1979-01-01

    The application and advantages of abradable coatings as gas-path seals in a general aviation turbine engine were evaluated for use on the high-pressure compressor, the high-pressure turbine, and the low-pressure turbine shrouds. Topics covered include: (1) the initial selection of candidate materials for interim full-scale engine testing; (2) interim engine testing of the initially selected materials and additional candidate materials; (3) the design of the component required to adapt the hardware to permit full-scale engine testing of the most promising materials; (4) finalization of the fabrication methods used in the manufacture of engine test hardware; and (5) the manufacture of the hardware necessary to support the final full-scale engine tests.

  14. Adjustable Autonomy and Human-Agent Teamwork in Practice: An Interim Report on Space Applications

    NASA Technical Reports Server (NTRS)

    Bradshaw, Jeffrey M.; Feltovich, Paul; Hoffman, Robert; Jeffers, Renia; Suri, Niranhan; Uszok, Andrzej; VanHoof, Ron; Acquisti, Alessandro; Prescott, Debbie

    2003-01-01

    We give a preliminary perspective on the basic principles and pitfalls of adjustable autonomy and human-centered teamwork. We then summarize the interim results of our study on the problem of work practice modeling and human-agent collaboration in space applications, the development of a broad model of human-agent teamwork grounded in practice, and the integration of the Brahms, KAoS, and NOMADS agent frameworks. We hope our work will benefit those who plan and participate in work activities in a wide variety of space applications, as well as those who are interested in design and execution tools for teams of robots that can function as effective assistants to humans.

  15. Status of the ITER Cryodistribution

    NASA Astrophysics Data System (ADS)

    Chang, H.-S.; Vaghela, H.; Patel, P.; Rizzato, A.; Cursan, M.; Henry, D.; Forgeas, A.; Grillot, D.; Sarkar, B.; Muralidhara, S.; Das, J.; Shukla, V.; Adler, E.

    2017-12-01

    Since the conceptual design of the ITER Cryodistribution many modifications have been applied due to both system optimization and improved knowledge of the clients’ requirements. Process optimizations in the Cryoplant resulted in component simplifications whereas increased heat load in some of the superconducting magnet systems required more complicated process configuration but also the removal of a cold box was possible due to component arrangement standardization. Another cold box, planned for redundancy, has been removed due to the Tokamak in-Cryostat piping layout modification. In this proceeding we will summarize the present design status and component configuration of the ITER Cryodistribution with all changes implemented which aim at process optimization and simplification as well as operational reliability, stability and flexibility.

  16. Summary of ECE presentations at EC-18

    DOE PAGES

    Taylor, G.

    2015-03-12

    There were nine ECE and one EBE presentation at EC-18. Four of the presentations were on various aspects of ECE on ITER. The ITER ECE diagnostic has entered an important detailed preliminary design phase and faces several design challenges in the next 2-3 years. Most of the other ECE presentations at the workshop were focused on applications of ECE diagnostics to plasma measurements, rather than improvements in technology, although it was apparent that heterodyne receiver technology continues to improve. CECE, ECE imaging and EBE imaging are increasingly providing valuable insights into plasma behavior that is important to understand if futuremore » burning plasma devices, such as ITER, FNSF and DEMO, are to be successful.« less

  17. 43 CFR 3809.201 - What should these agreements address?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... Operations must not begin until BLM completes consultation or conferencing under the Endangered Species Act. ... whether Federally proposed or listed threatened or endangered species or their proposed or designated... Policy Act; performance standards; interim management of temporary closure; financial guarantees...

  18. 43 CFR 3809.201 - What should these agreements address?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... Operations must not begin until BLM completes consultation or conferencing under the Endangered Species Act. ... whether Federally proposed or listed threatened or endangered species or their proposed or designated... Policy Act; performance standards; interim management of temporary closure; financial guarantees...

  19. 43 CFR 3809.201 - What should these agreements address?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... Operations must not begin until BLM completes consultation or conferencing under the Endangered Species Act. ... whether Federally proposed or listed threatened or endangered species or their proposed or designated... Policy Act; performance standards; interim management of temporary closure; financial guarantees...

  20. Interim Conclusions, Recommendations, and Design Guidelines for Durability of Post-Tensioned Bridge Substructures

    DOT National Transportation Integrated Search

    1999-10-01

    The use of post-tensioning in bridges can provide durability and structural benefits to the system while expediting the construction process. When post-tensioning is combined with precast elements, traffic interference can be greatly reduced through ...

  1. 75 FR 24957 - Decision to Evaluate a Petition to Designate a Class of Employees From the Los Alamos National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... Laboratory. Location: Los Alamos, New Mexico. Job Titles and/or Job Duties: All employees of the Department.... Hinnefeld, Interim Director, Division of Compensation Analysis and Support, National Institute for...

  2. 75 FR 51815 - Decision To Evaluate a Petition To Designate a Class of Employees From the Norton Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-23

    ..., Massachusetts. Job Titles and/or Job Duties: All employees who worked in any building or area. Period of..., Interim Director, Division of Compensation Analysis and Support, National Institute for Occupational...

  3. Mobile satellite service for Canada

    NASA Technical Reports Server (NTRS)

    Sward, David

    1988-01-01

    The Mobile Satellite (MSAT) system and a special program designed to provide interim mobile satellite services (IMSS) during the construction phase of MSAT are described. A mobile satellite system is a key element in extending voice and and data telecommunications to all Canadians.

  4. MEPDG Traffic Loading Defaults Derived from Traffic Pooled Fund Study

    DOT National Transportation Integrated Search

    2016-04-01

    As part of traffic loading inputs, the Mechanistic-Empirical Pavement Design Guide (MEPDG), Interim Edition: A Manual of Practice requires detailed axle loading information in the form of normalized axle load spectra (NALS), number of axle per truck ...

  5. Proof of concept deployment plan.

    DOT National Transportation Integrated Search

    2008-02-01

    The U.S. Department of Transportation (USDOT) Next Generation 9-1-1 (NG9-1-1) : Proof-of-Concept (POC) demonstration is envisioned to test key features and : functionalities of the NG9-1-1 system. The Interim POC System Design Document : defines the ...

  6. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emissions analysis as listed in § 93.127 need not be explicitly considered): (1) All in-place regionally... must include the project with its original design concept and scope, and the ‘Action’ scenario must include the project with its new design concept and scope. [62 FR 43801, Aug. 15, 1997, as amended at 69...

  7. Hybrid Wing-Body (HWB) Pressurized Fuselage Modeling, Analysis, and Design for Weight Reduction

    NASA Technical Reports Server (NTRS)

    Mukhopadhyay, Vivek

    2012-01-01

    This paper describes the interim progress for an in-house study that is directed toward innovative structural analysis and design of next-generation advanced aircraft concepts, such as the Hybrid Wing-Body (HWB) and the Advanced Mobility Concept-X flight vehicles, for structural weight reduction and associated performance enhancement. Unlike the conventional, skin-stringer-frame construction for a cylindrical fuselage, the box-type pressurized fuselage panels in the HWB undergo significant deformation of the outer aerodynamic surfaces, which must be minimized without significant structural weight penalty. Simple beam and orthotropic plate theory is first considered for sizing, analytical verification, and possible equivalent-plate analysis with appropriate simplification. By designing advanced composite stiffened-shell configurations, significant weight reduction may be possible compared with the sandwich and ribbed-shell structural concepts that have been studied previously. The study involves independent analysis of the advanced composite structural concepts that are presently being developed by The Boeing Company for pressurized HWB flight vehicles. High-fidelity parametric finite-element models of test coupons, panels, and multibay fuselage sections, were developed for conducting design studies and identifying critical areas of potential failure. Interim results are discussed to assess the overall weight/strength advantages.

  8. Internal pilots for a class of linear mixed models with Gaussian and compound symmetric data

    PubMed Central

    Gurka, Matthew J.; Coffey, Christopher S.; Muller, Keith E.

    2015-01-01

    SUMMARY An internal pilot design uses interim sample size analysis, without interim data analysis, to adjust the final number of observations. The approach helps to choose a sample size sufficiently large (to achieve the statistical power desired), but not too large (which would waste money and time). We report on recent research in cerebral vascular tortuosity (curvature in three dimensions) which would benefit greatly from internal pilots due to uncertainty in the parameters of the covariance matrix used for study planning. Unfortunately, observations correlated across the four regions of the brain and small sample sizes preclude using existing methods. However, as in a wide range of medical imaging studies, tortuosity data have no missing or mistimed data, a factorial within-subject design, the same between-subject design for all responses, and a Gaussian distribution with compound symmetry. For such restricted models, we extend exact, small sample univariate methods for internal pilots to linear mixed models with any between-subject design (not just two groups). Planning a new tortuosity study illustrates how the new methods help to avoid sample sizes that are too small or too large while still controlling the type I error rate. PMID:17318914

  9. Conceptual design of ACB-CP for ITER cryogenic system

    NASA Astrophysics Data System (ADS)

    Jiang, Yongcheng; Xiong, Lianyou; Peng, Nan; Tang, Jiancheng; Liu, Liqiang; Zhang, Liang

    2012-06-01

    ACB-CP (Auxiliary Cold Box for Cryopumps) is used to supply the cryopumps system with necessary cryogen in ITER (International Thermonuclear Experimental Reactor) cryogenic distribution system. The conceptual design of ACB-CP contains thermo-hydraulic analysis, 3D structure design and strength checking. Through the thermohydraulic analysis, the main specifications of process valves, pressure safety valves, pipes, heat exchangers can be decided. During the 3D structure design process, vacuum requirement, adiabatic requirement, assembly constraints and maintenance requirement have been considered to arrange the pipes, valves and other components. The strength checking has been performed to crosscheck if the 3D design meets the strength requirements for the ACB-CP.

  10. Wide-Field InfraRed Survey Telescope WFIRST

    NASA Technical Reports Server (NTRS)

    Green, J.; Schechter, P.; Baltay, C.; Bean, R.; Bennett, D.; Brown, R.; Conselice, C.; Donahue, M.; Fan, X.; Rauscher, B.; hide

    2012-01-01

    In December 2010, NASA created a Science Definition Team (SDT) for WFIRST, the Wide Field Infra-Red Survey Telescope, recommended by the Astro 2010 Decadal Survey as the highest priority for a large space mission. The SDT was chartered to work with the WFIRST Project Office at GSFC and the Program Office at JPL to produce a Design Reference Mission (DRM) for WFIRST. Part of the original charge was to produce an interim design reference mission by mid-2011. That document was delivered to NASA and widely circulated within the astronomical community. In late 2011 the Astrophysics Division augmented its original charge, asking for two design reference missions. The first of these, DRM1, was to be a finalized version of the interim DRM, reducing overall mission costs where possible. The second of these, DRM2, was to identify and eliminate capabilities that overlapped with those of NASA's James Webb Space Telescope (henceforth JWST), ESA's Euclid mission, and the NSF's ground-based Large Synoptic Survey Telescope (henceforth LSST), and again to reduce overall mission cost, while staying faithful to NWNH. This report presents both DRM1 and DRM2.

  11. Doppler Lidar System Design via Interdisciplinary Design Concept at NASA Langley Research Center - Part II

    NASA Technical Reports Server (NTRS)

    Crasner, Aaron I.; Scola,Salvatore; Beyon, Jeffrey Y.; Petway, Larry B.

    2014-01-01

    Optimized designs of the Navigation Doppler Lidar (NDL) instrument for Autonomous Landing Hazard Avoidance Technology (ALHAT) were accomplished via Interdisciplinary Design Concept (IDEC) at NASA Langley Research Center during the summer of 2013. Three branches in the Engineering Directorate and three students were involved in this joint task through the NASA Langley Aerospace Research Summer Scholars (LARSS) Program. The Laser Remote Sensing Branch (LRSB), Mechanical Systems Branch (MSB), and Structural and Thermal Systems Branch (STSB) were engaged to achieve optimal designs through iterative and interactive collaborative design processes. A preliminary design iteration was able to reduce the power consumption, mass, and footprint by removing redundant components and replacing inefficient components with more efficient ones. A second design iteration reduced volume and mass by replacing bulky components with excessive performance with smaller components custom-designed for the power system. Thermal modeling software was used to run steady state thermal analyses, which were used to both validate the designs and recommend further changes. Analyses were run on each redesign, as well as the original system. Thermal Desktop was used to run trade studies to account for uncertainty and assumptions about fan performance and boundary conditions. The studies suggested that, even if the assumptions were significantly wrong, the redesigned systems would remain within operating temperature limits.

  12. Alternative Models for Individualized Armor Training. Part I. Interim Report: Review and Analysis of the Literature

    DTIC Science & Technology

    1980-01-01

    for an individualized instructional con- text is provided by Giordono (1975), in his discussion of the design of a " non - lockstep educational system...state of ATI research, sum- marized the methodological and theoretical problems that may have inhibited the application of ATI findings to the design ...years. In contrast, systematic modifications based on results obtained through the application of appropriate experimental designs are desired and

  13. ITER structural design criteria and their extension to advanced reactor blankets*1

    NASA Astrophysics Data System (ADS)

    Majumdar, S.; Kalinin, G.

    2000-12-01

    Applications of the recent ITER structural design criteria (ISDC) are illustrated by two components. First, the low-temperature-design rules are applied to copper alloys that are particularly prone to irradiation embrittlement at relatively low fluences at certain temperatures. Allowable stresses are derived and the impact of the embrittlement on allowable surface heat flux of a simple first-wall/limiter design is demonstrated. Next, the high-temperature-design rules of ISDC are applied to evaporation of lithium and vapor extraction (EVOLVE), a blanket design concept currently being investigated under the US Advanced Power Extraction (APEX) program. A single tungsten first-wall tube is considered for thermal and stress analyses by finite-element method.

  14. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  15. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  16. Progress in Development of the ITER Plasma Control System Simulation Platform

    NASA Astrophysics Data System (ADS)

    Walker, Michael; Humphreys, David; Sammuli, Brian; Ambrosino, Giuseppe; de Tommasi, Gianmaria; Mattei, Massimiliano; Raupp, Gerhard; Treutterer, Wolfgang; Winter, Axel

    2017-10-01

    We report on progress made and expected uses of the Plasma Control System Simulation Platform (PCSSP), the primary test environment for development of the ITER Plasma Control System (PCS). PCSSP will be used for verification and validation of the ITER PCS Final Design for First Plasma, to be completed in 2020. We discuss the objectives of PCSSP, its overall structure, selected features, application to existing devices, and expected evolution over the lifetime of the ITER PCS. We describe an archiving solution for simulation results, methods for incorporating physics models of the plasma and physical plant (tokamak, actuator, and diagnostic systems) into PCSSP, and defining characteristics of models suitable for a plasma control development environment such as PCSSP. Applications of PCSSP simulation models including resistive plasma equilibrium evolution are demonstrated. PCSSP development supported by ITER Organization under ITER/CTS/6000000037. Resistive evolution code developed under General Atomics' Internal funding. The views and opinions expressed herein do not necessarily reflect those of the ITER Organization.

  17. Iterative inversion of deformation vector fields with feedback control.

    PubMed

    Dubey, Abhishek; Iliopoulos, Alexandros-Stavros; Sun, Xiaobai; Yin, Fang-Fang; Ren, Lei

    2018-05-14

    Often, the inverse deformation vector field (DVF) is needed together with the corresponding forward DVF in four-dimesional (4D) reconstruction and dose calculation, adaptive radiation therapy, and simultaneous deformable registration. This study aims at improving both accuracy and efficiency of iterative algorithms for DVF inversion, and advancing our understanding of divergence and latency conditions. We introduce a framework of fixed-point iteration algorithms with active feedback control for DVF inversion. Based on rigorous convergence analysis, we design control mechanisms for modulating the inverse consistency (IC) residual of the current iterate, to be used as feedback into the next iterate. The control is designed adaptively to the input DVF with the objective to enlarge the convergence area and expedite convergence. Three particular settings of feedback control are introduced: constant value over the domain throughout the iteration; alternating values between iteration steps; and spatially variant values. We also introduce three spectral measures of the displacement Jacobian for characterizing a DVF. These measures reveal the critical role of what we term the nontranslational displacement component (NTDC) of the DVF. We carry out inversion experiments with an analytical DVF pair, and with DVFs associated with thoracic CT images of six patients at end of expiration and end of inspiration. The NTDC-adaptive iterations are shown to attain a larger convergence region at a faster pace compared to previous nonadaptive DVF inversion iteration algorithms. By our numerical experiments, alternating control yields smaller IC residuals and inversion errors than constant control. Spatially variant control renders smaller residuals and errors by at least an order of magnitude, compared to other schemes, in no more than 10 steps. Inversion results also show remarkable quantitative agreement with analysis-based predictions. Our analysis captures properties of DVF data associated with clinical CT images, and provides new understanding of iterative DVF inversion algorithms with a simple residual feedback control. Adaptive control is necessary and highly effective in the presence of nonsmall NTDCs. The adaptive iterations or the spectral measures, or both, may potentially be incorporated into deformable image registration methods. © 2018 American Association of Physicists in Medicine.

  18. Analysis and Design of ITER 1 MV Core Snubber

    NASA Astrophysics Data System (ADS)

    Wang, Haitian; Li, Ge

    2012-11-01

    The core snubber, as a passive protection device, can suppress arc current and absorb stored energy in stray capacitance during the electrical breakdown in accelerating electrodes of ITER NBI. In order to design the core snubber of ITER, the control parameters of the arc peak current have been firstly analyzed by the Fink-Baker-Owren (FBO) method, which are used for designing the DIIID 100 kV snubber. The B-H curve can be derived from the measured voltage and current waveforms, and the hysteresis loss of the core snubber can be derived using the revised parallelogram method. The core snubber can be a simplified representation as an equivalent parallel resistance and inductance, which has been neglected by the FBO method. A simulation code including the parallel equivalent resistance and inductance has been set up. The simulation and experiments result in dramatically large arc shorting currents due to the parallel inductance effect. The case shows that the core snubber utilizing the FBO method gives more compact design.

  19. DEM Calibration Approach: design of experiment

    NASA Astrophysics Data System (ADS)

    Boikov, A. V.; Savelev, R. V.; Payor, V. A.

    2018-05-01

    The problem of DEM models calibration is considered in the article. It is proposed to divide models input parameters into those that require iterative calibration and those that are recommended to measure directly. A new method for model calibration based on the design of the experiment for iteratively calibrated parameters is proposed. The experiment is conducted using a specially designed stand. The results are processed with technical vision algorithms. Approximating functions are obtained and the error of the implemented software and hardware complex is estimated. The prospects of the obtained results are discussed.

  20. Iterative User-Centered Design of a Next Generation Patient Monitoring System for Emergency Medical Response

    PubMed Central

    Gao, Tia; Kim, Matthew I.; White, David; Alm, Alexander M.

    2006-01-01

    We have developed a system for real-time patient monitoring during large-scale disasters. Our system is designed with scalable algorithms to monitor large numbers of patients, an intuitive interface to support the overwhelmed responders, and ad-hoc mesh networking capabilities to maintain connectivity to patients in the chaotic settings. This paper describes an iterative approach to user-centered design adopted to guide development of our system. This system is a part of the Advanced Health and Disaster Aid Network (AID-N) architecture. PMID:17238348

  1. Effect of salt additives on concrete degradation : interim report

    DOT National Transportation Integrated Search

    1993-06-01

    Many chemical additives designed to inhibit the corrosive effect of salt on rebars are being marketed. Their effect on Portland Cement Concrete is neither known nor understood. This study is an attempt to determine if there is an effect and to unders...

  2. Southern California ITS Priority Corridor strategic deployment plan : interim report

    DOT National Transportation Integrated Search

    1998-08-01

    This deployment plan will be the "blueprint" for agencies to follow to ensure that projects are designed and built to conform to the National ITS Architecture and Standards, a requirement for funding under TEA 21. The federal ITS planning and deploym...

  3. 75 FR 14443 - Decision To Evaluate a Petition To Designate a Class of Employees for Revere Copper and Brass in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    .... Job Titles and/or Job Duties: Extruders and Shapes Specialists who worked in the Rod and Shape Mill... L. Hinnefeld, Interim Director, Division of Compensation Analysis and Support, National Institute...

  4. 40 CFR 745.83 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with none of the air leaking past it. Interim controls means a set of measures designed to temporarily... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED... disposable cleaning cloths with the card, whether post-renovation cleaning has been properly completed...

  5. 40 CFR 745.83 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with none of the air leaking past it. Interim controls means a set of measures designed to temporarily... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED... disposable cleaning cloths with the card, whether post-renovation cleaning has been properly completed...

  6. Interim Evaluation of Three Instrumented Bridge Decks in Saco, Montana

    DOT National Transportation Integrated Search

    2006-06-01

    Since the service life of concrete bridge decks designed by traditional procedures is often shorter than desired, : their ability to withstand constant and heavy use in a variety of operating environments is of major concern. In : this project, the r...

  7. Evaluation of experimental flexible pavements : interim report no. 1, construction of Altavista Bypass experimental pavement.

    DOT National Transportation Integrated Search

    1974-01-01

    Deflection tests conducted during the construction and shortly after the completion of a large experimental pavement project are reported. Four different pavement designs, as follows, are compared: 1. 6-inch cement stabilized subgrade, 6-inch crushed...

  8. Rural applications of advanced traveler information systems : user needs and technology assessment

    DOT National Transportation Integrated Search

    1997-07-01

    The User Needs and Technology Assessment Report is one in a series of interim documents for the Rural Applications of Advanced Traveler Information Systems (ATIS) project. The document describes the research design and findings from rural traveler su...

  9. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  10. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...

  11. Preliminary consideration of CFETR ITER-like case diagnostic system.

    PubMed

    Li, G S; Yang, Y; Wang, Y M; Ming, T F; Han, X; Liu, S C; Wang, E H; Liu, Y K; Yang, W J; Li, G Q; Hu, Q S; Gao, X

    2016-11-01

    Chinese Fusion Engineering Test Reactor (CFETR) is a new superconducting tokamak device being designed in China, which aims at bridging the gap between ITER and DEMO, where DEMO is a tokamak demonstration fusion reactor. Two diagnostic cases, ITER-like case and towards DEMO case, have been considered for CFETR early and later operating phases, respectively. In this paper, some preliminary consideration of ITER-like case will be presented. Based on ITER diagnostic system, three versions of increased complexity and coverage of the ITER-like case diagnostic system have been developed with different goals and functions. Version A aims only machine protection and basic control. Both of version B and version C are mainly for machine protection, basic and advanced control, but version C has an increased level of redundancy necessary for improved measurements capability. The performance of these versions and needed R&D work are outlined.

  12. Preliminary consideration of CFETR ITER-like case diagnostic system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, G. S.; Liu, Y. K.; Gao, X.

    2016-11-15

    Chinese Fusion Engineering Test Reactor (CFETR) is a new superconducting tokamak device being designed in China, which aims at bridging the gap between ITER and DEMO, where DEMO is a tokamak demonstration fusion reactor. Two diagnostic cases, ITER-like case and towards DEMO case, have been considered for CFETR early and later operating phases, respectively. In this paper, some preliminary consideration of ITER-like case will be presented. Based on ITER diagnostic system, three versions of increased complexity and coverage of the ITER-like case diagnostic system have been developed with different goals and functions. Version A aims only machine protection and basicmore » control. Both of version B and version C are mainly for machine protection, basic and advanced control, but version C has an increased level of redundancy necessary for improved measurements capability. The performance of these versions and needed R&D work are outlined.« less

  13. Iterative simulated quenching for designing irregular-spot-array generators.

    PubMed

    Gillet, J N; Sheng, Y

    2000-07-10

    We propose a novel, to our knowledge, algorithm of iterative simulated quenching with temperature rescaling for designing diffractive optical elements, based on an analogy between simulated annealing and statistical thermodynamics. The temperature is iteratively rescaled at the end of each quenching process according to ensemble statistics to bring the system back from a frozen imperfect state with a local minimum of energy to a dynamic state in a Boltzmann heat bath in thermal equilibrium at the rescaled temperature. The new algorithm achieves much lower cost function and reconstruction error and higher diffraction efficiency than conventional simulated annealing with a fast exponential cooling schedule and is easy to program. The algorithm is used to design binary-phase generators of large irregular spot arrays. The diffractive phase elements have trapezoidal apertures of varying heights, which fit ideal arbitrary-shaped apertures better than do trapezoidal apertures of fixed heights.

  14. Approximate techniques of structural reanalysis

    NASA Technical Reports Server (NTRS)

    Noor, A. K.; Lowder, H. E.

    1974-01-01

    A study is made of two approximate techniques for structural reanalysis. These include Taylor series expansions for response variables in terms of design variables and the reduced-basis method. In addition, modifications to these techniques are proposed to overcome some of their major drawbacks. The modifications include a rational approach to the selection of the reduced-basis vectors and the use of Taylor series approximation in an iterative process. For the reduced basis a normalized set of vectors is chosen which consists of the original analyzed design and the first-order sensitivity analysis vectors. The use of the Taylor series approximation as a first (initial) estimate in an iterative process, can lead to significant improvements in accuracy, even with one iteration cycle. Therefore, the range of applicability of the reanalysis technique can be extended. Numerical examples are presented which demonstrate the gain in accuracy obtained by using the proposed modification techniques, for a wide range of variations in the design variables.

  15. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...

  16. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...

  17. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  18. Evaluating the iterative development of VR/AR human factors tools for manual work.

    PubMed

    Liston, Paul M; Kay, Alison; Cromie, Sam; Leva, Chiara; D'Cruz, Mirabelle; Patel, Harshada; Langley, Alyson; Sharples, Sarah; Aromaa, Susanna

    2012-01-01

    This paper outlines the approach taken to iteratively evaluate a set of VR/AR (virtual reality / augmented reality) applications for five different manual-work applications - terrestrial spacecraft assembly, assembly-line design, remote maintenance of trains, maintenance of nuclear reactors, and large-machine assembly process design - and examines the evaluation data for evidence of the effectiveness of the evaluation framework as well as the benefits to the development process of feedback from iterative evaluation. ManuVAR is an EU-funded research project that is working to develop an innovative technology platform and a framework to support high-value, high-knowledge manual work throughout the product lifecycle. The results of this study demonstrate the iterative improvements reached throughout the design cycles, observable through the trending of the quantitative results from three successive trials of the applications and the investigation of the qualitative interview findings. The paper discusses the limitations of evaluation in complex, multi-disciplinary development projects and finds evidence of the effectiveness of the use of the particular set of complementary evaluation methods incorporating a common inquiry structure used for the evaluation - particularly in facilitating triangulation of the data.

  19. PREFACE: Progress in the ITER Physics Basis

    NASA Astrophysics Data System (ADS)

    Ikeda, K.

    2007-06-01

    I would firstly like to congratulate all who have contributed to the preparation of the `Progress in the ITER Physics Basis' (PIPB) on its publication and express my deep appreciation of the hard work and commitment of the many scientists involved. With the signing of the ITER Joint Implementing Agreement in November 2006, the ITER Members have now established the framework for construction of the project, and the ITER Organization has begun work at Cadarache. The review of recent progress in the physics basis for burning plasma experiments encompassed by the PIPB will be a valuable resource for the project and, in particular, for the current Design Review. The ITER design has been derived from a physics basis developed through experimental, modelling and theoretical work on the properties of tokamak plasmas and, in particular, on studies of burning plasma physics. The `ITER Physics Basis' (IPB), published in 1999, has been the reference for the projection methodologies for the design of ITER, but the IPB also highlighted several key issues which needed to be resolved to provide a robust basis for ITER operation. In the intervening period scientists of the ITER Participant Teams have addressed these issues intensively. The International Tokamak Physics Activity (ITPA) has provided an excellent forum for scientists involved in these studies, focusing their work on the high priority physics issues for ITER. Significant progress has been made in many of the issues identified in the IPB and this progress is discussed in depth in the PIPB. In this respect, the publication of the PIPB symbolizes the strong interest and enthusiasm of the plasma physics community for the success of the ITER project, which we all recognize as one of the great scientific challenges of the 21st century. I wish to emphasize my appreciation of the work of the ITPA Coordinating Committee members, who are listed below. Their support and encouragement for the preparation of the PIPB were fundamental to its completion. I am pleased to witness the extensive collaborations, the excellent working relationships and the free exchange of views that have been developed among scientists working on magnetic fusion, and I would particularly like to acknowledge the importance which they assign to ITER in their research. This close collaboration and the spirit of free discussion will be essential to the success of ITER. Finally, the PIPB identifies issues which remain in the projection of burning plasma performance to the ITER scale and in the control of burning plasmas. Continued R&D is therefore called for to reduce the uncertainties associated with these issues and to ensure the efficient operation and exploitation of ITER. It is important that the international fusion community maintains a high level of collaboration in the future to address these issues and to prepare the physics basis for ITER operation. ITPA Coordination Committee R. Stambaugh (Chair of ITPA CC, General Atomics, USA) D.J. Campbell (Previous Chair of ITPA CC, European Fusion Development Agreement—Close Support Unit, ITER Organization) M. Shimada (Co-Chair of ITPA CC, ITER Organization) R. Aymar (ITER International Team, CERN) V. Chuyanov (ITER Organization) J.H. Han (Korea Basic Science Institute, Korea) Y. Huo (Zengzhou University, China) Y.S. Hwang (Seoul National University, Korea) N. Ivanov (Kurchatov Institute, Russia) Y. Kamada (Japan Atomic Energy Agency, Naka, Japan) P.K. Kaw (Institute for Plasma Research, India) S. Konovalov (Kurchatov Institute, Russia) M. Kwon (National Fusion Research Center, Korea) J. Li (Academy of Science, Institute of Plasma Physics, China) S. Mirnov (TRINITI, Russia) Y. Nakamura (National Institute for Fusion Studies, Japan) H. Ninomiya (Japan Atomic Energy Agency, Naka, Japan) E. Oktay (Department of Energy, USA) J. Pamela (European Fusion Development Agreement—Close Support Unit) C. Pan (Southwestern Institute of Physics, China) F. Romanelli (Ente per le Nuove tecnologie, l'Energia e l'Ambiente, Italy and European Fusion Development Agreement—Close Support Unit) N. Sauthoff (Princeton Plasma Physics Laboratory, USA and Oak Ridge National Laboratories, USA) Y. Saxena (Institute for Plasma Research, India) Y. Shimomura (ITER Organization) R. Singh (Institute for Plasma Research, India) S. Takamura (Nagoya University, Japan) K. Toi (National Institute for Fusion Studies, Japan) M. Wakatani (Kyoto University, Japan (deceased)) H. Zohm (Max-Planck-Institut für Plasmaphysik, Garching, Germany)

  20. Advanced Data Acquisition System Implementation for the ITER Neutron Diagnostic Use Case Using EPICS and FlexRIO Technology on a PXIe Platform

    NASA Astrophysics Data System (ADS)

    Sanz, D.; Ruiz, M.; Castro, R.; Vega, J.; Afif, M.; Monroe, M.; Simrock, S.; Debelle, T.; Marawar, R.; Glass, B.

    2016-04-01

    To aid in assessing the functional performance of ITER, Fission Chambers (FC) based on the neutron diagnostic use case deliver timestamped measurements of neutron source strength and fusion power. To demonstrate the Plant System Instrumentation & Control (I&C) required for such a system, ITER Organization (IO) has developed a neutron diagnostics use case that fully complies with guidelines presented in the Plant Control Design Handbook (PCDH). The implementation presented in this paper has been developed on the PXI Express (PXIe) platform using products from the ITER catalog of standard I&C hardware for fast controllers. Using FlexRIO technology, detector signals are acquired at 125 MS/s, while filtering, decimation, and three methods of neutron counting are performed in real-time via the onboard Field Programmable Gate Array (FPGA). Measurement results are reported every 1 ms through Experimental Physics and Industrial Control System (EPICS) Channel Access (CA), with real-time timestamps derived from the ITER Timing Communication Network (TCN) based on IEEE 1588-2008. Furthermore, in accordance with ITER specifications for CODAC Core System (CCS) application development, the software responsible for the management, configuration, and monitoring of system devices has been developed in compliance with a new EPICS module called Nominal Device Support (NDS) and RIO/FlexRIO design methodology.

  1. An Interim Report of the Evaluation of a Comprehensive High School Civic Engagement Intervention in Hudson, MA. CIRCLE Working Paper 58

    ERIC Educational Resources Information Center

    McIntosh, Hugh; Berman, Sheldon H.; Youniss, James

    2007-01-01

    In September 2003, Hudson High School in Hudson, Massachusetts launched two new civic development efforts--clustering and schoolwide governance--and moved into a new building designed to facilitate them. Clustering is designed to achieve a sense of community within a large school by creating small communities of 100 to 150 students. To create…

  2. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  3. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...

  4. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...

  5. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...

  6. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...

  7. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  8. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  9. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  10. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  11. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  12. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  13. In-vacuum sensors for the beamline components of the ITER neutral beam test facility.

    PubMed

    Dalla Palma, M; Pasqualotto, R; Sartori, E; Spagnolo, S; Spolaore, M; Veltri, P

    2016-11-01

    Embedded sensors have been designed for installation on the components of the MITICA beamline, the prototype ITER neutral beam injector (Megavolt ITER Injector and Concept Advancement), to derive characteristics of the particle beam and to monitor the component conditions during operation for protection and thermal control. Along the beamline, the components interacting with the particle beam are the neutralizer, the residual ion dump, and the calorimeter. The design and the positioning of sensors on each component have been developed considering the expected beam-surface interaction including non-ideal and off-normal conditions. The arrangement of the following instrumentation is presented: thermal sensors, strain gages, electrostatic probes including secondary emission detectors, grounding shunt for electrical currents, and accelerometers.

  14. Stokes-Doppler coherence imaging for ITER boundary tomography.

    PubMed

    Howard, J; Kocan, M; Lisgo, S; Reichle, R

    2016-11-01

    An optical coherence imaging system is presently being designed for impurity transport studies and other applications on ITER. The wide variation in magnetic field strength and pitch angle (assumed known) across the field of view generates additional Zeeman-polarization-weighting information that can improve the reliability of tomographic reconstructions. Because background reflected light will be somewhat depolarized analysis of only the polarized fraction may be enough to provide a level of background suppression. We present the principles behind these ideas and some simulations that demonstrate how the approach might work on ITER. The views and opinions expressed herein do not necessarily reflect those of the ITER Organization.

  15. Engineering aspects of design and integration of ECE diagnostic in ITER

    DOE PAGES

    Udintsev, V. S.; Taylor, G.; Pandya, H. K.B.; ...

    2015-03-12

    ITER ECE diagnostic [1] needs not only to meet measurement requirements, but also to withstand various loads, such as electromagnetic, mechanical, neutronic and thermal, and to be protected from stray ECH radiation at 170 GHz and other millimeter wave emission, like Collective Thomson scattering which is planned to operate at 60 GHz. Same or similar loads will be applied to other millimetre-wave diagnostics [2], located both in-vessel and in-port plugs. These loads must be taken into account throughout the design phases of the ECE and other microwave diagnostics to ensure their structural integrity and maintainability. The integration of microwave diagnosticsmore » with other ITER systems is another challenging activity which is currently ongoing through port integration and in-vessel integration work. Port Integration has to address the maintenance and the safety aspects of diagnostics, too. Engineering solutions which are being developed to support and to operate ITER ECE diagnostic, whilst complying with safety and maintenance requirements, are discussed in this paper.« less

  16. Implementation and adoption of nationwide electronic health records in secondary care in England: qualitative analysis of interim results from a prospective national evaluation

    PubMed Central

    Robertson, Ann; Cresswell, Kathrin; Takian, Amirhossein; Petrakaki, Dimitra; Crowe, Sarah; Cornford, Tony; Barber, Nicholas; Avery, Anthony; Fernando, Bernard; Jacklin, Ann; Prescott, Robin; Klecun, Ela; Paton, James; Lichtner, Valentina; Quinn, Casey; Ali, Maryam; Morrison, Zoe; Jani, Yogini; Waring, Justin; Marsden, Kate

    2010-01-01

    Objectives To describe and evaluate the implementation and adoption of detailed electronic health records in secondary care in England and thereby provide early feedback for the ongoing local and national rollout of the NHS Care Records Service. Design A mixed methods, longitudinal, multisite, socio-technical case study. Setting Five NHS acute hospital and mental health trusts that have been the focus of early implementation efforts and at which interim data collection and analysis are complete. Data sources and analysis Dataset for the evaluation consists of semi-structured interviews, documents and field notes, observations, and quantitative data. Qualitative data were analysed thematically with a socio-technical coding matrix, combined with additional themes that emerged from the data. Main results Hospital electronic health record applications are being developed and implemented far more slowly than was originally envisioned; the top-down, standardised approach has needed to evolve to admit more variation and greater local choice, which hospital trusts want in order to support local activity. Despite considerable delays and frustrations, support for electronic health records remains strong, including from NHS clinicians. Political and financial factors are now perceived to threaten nationwide implementation of electronic health records. Interviewees identified a range of consequences of long term, centrally negotiated contracts to deliver the NHS Care Records Service in secondary care, particularly as NHS trusts themselves are not party to these contracts. These include convoluted communication channels between different stakeholders, unrealistic deployment timelines, delays, and applications that could not quickly respond to changing national and local NHS priorities. Our data suggest support for a “middle-out” approach to implementing hospital electronic health records, combining government direction with increased local autonomy, and for restricting detailed electronic health record sharing to local health communities. Conclusions Experiences from the early implementation sites, which have received considerable attention, financial investment and support, indicate that delivering improved healthcare through nationwide electronic health records will be a long, complex, and iterative process requiring flexibility and local adaptability both with respect to the systems and the implementation strategy. The more tailored, responsive approach that is emerging is becoming better aligned with NHS organisations’ perceived needs and is, if pursued, likely to deliver clinically useful electronic health record systems. PMID:20813822

  17. Full Service ISDN Satellite (FSIS) network model for advanced ISDN satellite design and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.

    1992-01-01

    The Full Service Integrated Services Digital Network (FSIS) network model for advanced satellite designs describes a model suitable for discrete event simulations. A top down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ACTS and the Interim Service ISDN Satellite (ISIS) perform ISDN protocol analyses and switching decisions in the terrestrial domain, whereas FSIS makes all its analyses and decisions on-board the ISDN satellite.

  18. Development of a domain-specific genetic language to design Chlamydomonas reinhardtii expression vectors.

    PubMed

    Wilson, Mandy L; Okumoto, Sakiko; Adam, Laura; Peccoud, Jean

    2014-01-15

    Expression vectors used in different biotechnology applications are designed with domain-specific rules. For instance, promoters, origins of replication or homologous recombination sites are host-specific. Similarly, chromosomal integration or viral delivery of an expression cassette imposes specific structural constraints. As de novo gene synthesis and synthetic biology methods permeate many biotechnology specialties, the design of application-specific expression vectors becomes the new norm. In this context, it is desirable to formalize vector design strategies applicable in different domains. Using the design of constructs to express genes in the chloroplast of Chlamydomonas reinhardtii as an example, we show that a vector design strategy can be formalized as a domain-specific language. We have developed a graphical editor of context-free grammars usable by biologists without prior exposure to language theory. This environment makes it possible for biologists to iteratively improve their design strategies throughout the course of a project. It is also possible to ensure that vectors designed with early iterations of the language are consistent with the latest iteration of the language. The context-free grammar editor is part of the GenoCAD application. A public instance of GenoCAD is available at http://www.genocad.org. GenoCAD source code is available from SourceForge and licensed under the Apache v2.0 open source license.

  19. Aeromedical Airlift -- Do the Pieces Fit?

    DTIC Science & Technology

    1988-01-01

    architecture analysis. feasibility study, and system design phase. To save money and time associated with unforeseen down-line modifications that may... loand Redietribution of Patients in CONUS. Draft Interim; Report No. IX-h. Maximnus, Inc., McLean Va.: Prepared for Office of the Assistant.Secretary of

  20. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...

  1. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...

  2. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...

  3. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...

  4. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...

  5. Field study of a glass-reinforced plastic pedestrian bridge : interim report.

    DOT National Transportation Integrated Search

    1977-01-01

    Discussed are the design, fabrication, and load testing of girders composed entirely of glass-reinforced polyester (GRP) resin. The girders were 4.9 m (16 ft.) long and had geometric features which included trussed webs, a solid flange plate, and a t...

  6. Design of an Ultra-wide Band Waveguide Transition for the Ex-vessel Transmission Line of ITER Plasma Position Reflectometry

    NASA Astrophysics Data System (ADS)

    Simonetto, A.; Platania, P.; Garavaglia, S.; Gittini, G.; Granucci, G.; Pallotta, F.

    2018-02-01

    Plasma position reflectometry for ITER requires interfaces between in-vessel and ex-vessel waveguides. An ultra broadband interface (15-75 GHz) was designed between moderately oversized rectangular waveguide (20 × 12 mm), operated in TE01 (i.e., tall waveguide mode), and circular corrugated waveguide, with 88.9-mm internal diameter, propagating HE11. The interface was designed both as a sequence of waveguide components and as a quasi-optical confocal telescope. The design and the simulated performance are described for both concepts. The latter one requires more space but has better performance, and shall be prototyped.

  7. Simulation Modeling to Compare High-Throughput, Low-Iteration Optimization Strategies for Metabolic Engineering

    PubMed Central

    Heinsch, Stephen C.; Das, Siba R.; Smanski, Michael J.

    2018-01-01

    Increasing the final titer of a multi-gene metabolic pathway can be viewed as a multivariate optimization problem. While numerous multivariate optimization algorithms exist, few are specifically designed to accommodate the constraints posed by genetic engineering workflows. We present a strategy for optimizing expression levels across an arbitrary number of genes that requires few design-build-test iterations. We compare the performance of several optimization algorithms on a series of simulated expression landscapes. We show that optimal experimental design parameters depend on the degree of landscape ruggedness. This work provides a theoretical framework for designing and executing numerical optimization on multi-gene systems. PMID:29535690

  8. Grid2: A Program for Rapid Estimation of the Jovian Radiation Environment

    NASA Technical Reports Server (NTRS)

    Evans, R. W.; Brinza, D. E.

    2014-01-01

    Grid2 is a program that utilizes the Galileo Interim Radiation Electron model 2 (GIRE2) Jovian radiation model to compute fluences and doses for Jupiter missions. (Note: The iterations of these two softwares have been GIRE and GIRE2; likewise Grid and Grid2.) While GIRE2 is an important improvement over the original GIRE radiation model, the GIRE2 model can take as long as a day or more to compute these quantities for a complete mission. Grid2 fits the results of the detailed GIRE2 code with a set of grids in local time and position thereby greatly speeding up the execution of the model-minutes as opposed to days. The Grid2 model covers the time period from 1971 to 2050 and distances of 1.03 to 30 Jovian diameters (Rj). It is available as a direct-access database through a FORTRAN interface program. The new database is only slightly larger than the original grid version: 1.5 gigabytes (GB) versus 1.2 GB.

  9. 12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...

  10. Engineering Design of ITER Prototype Fast Plant System Controller

    NASA Astrophysics Data System (ADS)

    Goncalves, B.; Sousa, J.; Carvalho, B.; Rodrigues, A. P.; Correia, M.; Batista, A.; Vega, J.; Ruiz, M.; Lopez, J. M.; Rojo, R. Castro; Wallander, A.; Utzel, N.; Neto, A.; Alves, D.; Valcarcel, D.

    2011-08-01

    The ITER control, data access and communication (CODAC) design team identified the need for two types of plant systems. A slow control plant system is based on industrial automation technology with maximum sampling rates below 100 Hz, and a fast control plant system is based on embedded technology with higher sampling rates and more stringent real-time requirements than that required for slow controllers. The latter is applicable to diagnostics and plant systems in closed-control loops whose cycle times are below 1 ms. Fast controllers will be dedicated industrial controllers with the ability to supervise other fast and/or slow controllers, interface to actuators and sensors and, if necessary, high performance networks. Two prototypes of a fast plant system controller specialized for data acquisition and constrained by ITER technological choices are being built using two different form factors. This prototyping activity contributes to the Plant Control Design Handbook effort of standardization, specifically regarding fast controller characteristics. Envisaging a general purpose fast controller design, diagnostic use cases with specific requirements were analyzed and will be presented along with the interface with CODAC and sensors. The requirements and constraints that real-time plasma control imposes on the design were also taken into consideration. Functional specifications and technology neutral architecture, together with its implications on the engineering design, were considered. The detailed engineering design compliant with ITER standards was performed and will be discussed in detail. Emphasis will be given to the integration of the controller in the standard CODAC environment. Requirements for the EPICS IOC providing the interface to the outside world, the prototype decisions on form factor, real-time operating system, and high-performance networks will also be discussed, as well as the requirements for data streaming to CODAC for visualization and archiving.

  11. Evaluation of ITER MSE Viewing Optics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, S; Lerner, S; Morris, K

    2007-03-26

    The Motional Stark Effect (MSE) diagnostic on ITER determines the local plasma current density by measuring the polarization angle of light resulting from the interaction of a high energy neutral heating beam and the tokamak plasma. This light signal has to be transmitted from the edge and core of the plasma to a polarization analyzer located in the port plug. The optical system should either preserve the polarization information, or it should be possible to reliably calibrate any changes induced by the optics. This LLNL Work for Others project for the US ITER Project Office (USIPO) is focused on themore » design of the viewing optics for both the edge and core MSE systems. Several design constraints were considered, including: image quality, lack of polarization aberrations, ease of construction and cost of mirrors, neutron shielding, and geometric layout in the equatorial port plugs. The edge MSE optics are located in ITER equatorial port 3 and view Heating Beam 5, and the core system is located in equatorial port 1 viewing heating beam 4. The current work is an extension of previous preliminary design work completed by the ITER central team (ITER resources were not available to complete a detailed optimization of this system, and then the MSE was assigned to the US). The optimization of the optical systems at this level was done with the ZEMAX optical ray tracing code. The final LLNL designs decreased the ''blur'' in the optical system by nearly an order of magnitude, and the polarization blur was reduced by a factor of 3. The mirror sizes were reduced with an estimated cost savings of a factor of 3. The throughput of the system was greater than or equal to the previous ITER design. It was found that optical ray tracing was necessary to accurately measure the throughput. Metal mirrors, while they can introduce polarization aberrations, were used close to the plasma because of the anticipated high heat, particle, and neutron loads. These mirrors formed an intermediate image that then was relayed out of the port plug with more ideal (dielectric) mirrors. Engineering models of the optics, port plug, and neutral beam geometry were also created, using the CATIA ITER models. Two video conference calls with the USIPO provided valuable design guidelines, such as the minimum distance of the first optic from the plasma. A second focus of the project was the calibration of the system. Several different techniques are proposed, both before and during plasma operation. Fixed and rotatable polarizers would be used to characterize the system in the no-plasma case. Obtaining the full modulation spectrum from the polarization analyzer allows measurement of polarization effects and also MHD plasma phenomena. Light from neutral beam interaction with deuterium gas (no plasma) has been found useful to determine the wavelength of each spatial channel. The status of the optical design for the edge (upper) and core (lower) systems is included in the following figure. Several issues should be addressed by a follow-on study, including whether the optical labyrinth has sufficient neutron shielding and a detailed polarization characterization of actual mirrors.« less

  12. Doppler Lidar System Design via Interdisciplinary Design Concept at NASA Langley Research Center - Part I

    NASA Technical Reports Server (NTRS)

    Boyer, Charles M.; Jackson, Trevor P.; Beyon, Jeffrey Y.; Petway, Larry B.

    2013-01-01

    Optimized designs of the Navigation Doppler Lidar (NDL) instrument for Autonomous Landing Hazard Avoidance Technology (ALHAT) were accomplished via Interdisciplinary Design Concept (IDEC) at NASA Langley Research Center during the summer of 2013. Three branches in the Engineering Directorate and three students were involved in this joint task through the NASA Langley Aerospace Research Summer Scholars (LARSS) Program. The Laser Remote Sensing Branch (LRSB), Mechanical Systems Branch (MSB), and Structural and Thermal Systems Branch (STSB) were engaged to achieve optimal designs through iterative and interactive collaborative design processes. A preliminary design iteration was able to reduce the power consumption, mass, and footprint by removing redundant components and replacing inefficient components with more efficient ones. A second design iteration reduced volume and mass by replacing bulky components with excessive performance with smaller components custom-designed for the power system. Mechanical placement collaboration reduced potential electromagnetic interference (EMI). Through application of newly selected electrical components and thermal analysis data, a total electronic chassis redesign was accomplished. Use of an innovative forced convection tunnel heat sink was employed to meet and exceed project requirements for cooling, mass reduction, and volume reduction. Functionality was a key concern to make efficient use of airflow, and accessibility was also imperative to allow for servicing of chassis internals. The collaborative process provided for accelerated design maturation with substantiated function.

  13. Scientific and technical challenges on the road towards fusion electricity

    NASA Astrophysics Data System (ADS)

    Donné, A. J. H.; Federici, G.; Litaudon, X.; McDonald, D. C.

    2017-10-01

    The goal of the European Fusion Roadmap is to deliver fusion electricity to the grid early in the second half of this century. It breaks the quest for fusion energy into eight missions, and for each of them it describes a research and development programme to address all the open technical gaps in physics and technology and estimates the required resources. It points out the needs to intensify industrial involvement and to seek all opportunities for collaboration outside Europe. The roadmap covers three periods: the short term, which runs parallel to the European Research Framework Programme Horizon 2020, the medium term and the long term. ITER is the key facility of the roadmap as it is expected to achieve most of the important milestones on the path to fusion power. Thus, the vast majority of present resources are dedicated to ITER and its accompanying experiments. The medium term is focussed on taking ITER into operation and bringing it to full power, as well as on preparing the construction of a demonstration power plant DEMO, which will for the first time demonstrate fusion electricity to the grid around the middle of this century. Building and operating DEMO is the subject of the last roadmap phase: the long term. Clearly, the Fusion Roadmap is tightly connected to the ITER schedule. Three key milestones are the first operation of ITER, the start of the DT operation in ITER and reaching the full performance at which the thermal fusion power is 10 times the power put in to the plasma. The Engineering Design Activity of DEMO needs to start a few years after the first ITER plasma, while the start of the construction phase will be a few years after ITER reaches full performance. In this way ITER can give viable input to the design and development of DEMO. Because the neutron fluence in DEMO will be much higher than in ITER, it is important to develop and validate materials that can handle these very high neutron loads. For the testing of the materials, a dedicated 14 MeV neutron source is needed. This DEMO Oriented Neutron Source (DONES) is therefore an important facility to support the fusion roadmap.

  14. Genetic Constructor: An Online DNA Design Platform.

    PubMed

    Bates, Maxwell; Lachoff, Joe; Meech, Duncan; Zulkower, Valentin; Moisy, Anaïs; Luo, Yisha; Tekotte, Hille; Franziska Scheitz, Cornelia Johanna; Khilari, Rupal; Mazzoldi, Florencio; Chandran, Deepak; Groban, Eli

    2017-12-15

    Genetic Constructor is a cloud Computer Aided Design (CAD) application developed to support synthetic biologists from design intent through DNA fabrication and experiment iteration. The platform allows users to design, manage, and navigate complex DNA constructs and libraries, using a new visual language that focuses on functional parts abstracted from sequence. Features like combinatorial libraries and automated primer design allow the user to separate design from construction by focusing on functional intent, and design constraints aid iterative refinement of designs. A plugin architecture enables contributions from scientists and coders to leverage existing powerful software and connect to DNA foundries. The software is easily accessible and platform agnostic, free for academics, and available in an open-source community edition. Genetic Constructor seeks to democratize DNA design, manufacture, and access to tools and services from the synthetic biology community.

  15. Robust design of feedback feed-forward iterative learning control based on 2D system theory for linear uncertain systems

    NASA Astrophysics Data System (ADS)

    Li, Zhifu; Hu, Yueming; Li, Di

    2016-08-01

    For a class of linear discrete-time uncertain systems, a feedback feed-forward iterative learning control (ILC) scheme is proposed, which is comprised of an iterative learning controller and two current iteration feedback controllers. The iterative learning controller is used to improve the performance along the iteration direction and the feedback controllers are used to improve the performance along the time direction. First of all, the uncertain feedback feed-forward ILC system is presented by an uncertain two-dimensional Roesser model system. Then, two robust control schemes are proposed. One can ensure that the feedback feed-forward ILC system is bounded-input bounded-output stable along time direction, and the other can ensure that the feedback feed-forward ILC system is asymptotically stable along time direction. Both schemes can guarantee the system is robust monotonically convergent along the iteration direction. Third, the robust convergent sufficient conditions are given, which contains a linear matrix inequality (LMI). Moreover, the LMI can be used to determine the gain matrix of the feedback feed-forward iterative learning controller. Finally, the simulation results are presented to demonstrate the effectiveness of the proposed schemes.

  16. Interpretation of the Ecological Significance of Atrazine Stream-Water Concentrations Using a Statistically-Designed Monitoring Program

    EPA Science Inventory

    A risk assessment was conducted by the US Environmental Protection Agency (EPA) as part of the 2003 Interim Registration Eligibility Document (IRED) on atrazine. The assessment indicated potential community- and population-level risk to sensitive aquatic ecosystems at prolonged ...

  17. Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 2nd interim report.

    DOT National Transportation Integrated Search

    1995-02-01

    This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586 00. This was a complete recon...

  18. Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 1st interim report.

    DOT National Transportation Integrated Search

    1993-05-01

    This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586.00. This was a complete recon...

  19. Utilizing Snap-Tite slip line pipe as a direct burial cross pipe, construction and first interim report, October, 2007.

    DOT National Transportation Integrated Search

    2007-10-01

    The Maine Department of Transportation uses reinforced concrete, polymer coated corrugated metal, : corrugated aluminum or corrugated polyethylene for highway cross pipes. Design life for cross pipe is 50 : plus years. Repair of failed cross pipes in...

  20. 14 CFR 171.263 - Localizer automatic monitor system.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...

  1. 14 CFR 171.263 - Localizer automatic monitor system.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...

  2. 14 CFR 171.263 - Localizer automatic monitor system.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...

  3. 14 CFR 171.263 - Localizer automatic monitor system.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...

  4. 14 CFR 171.263 - Localizer automatic monitor system.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...

  5. Fatigue and shear behavior of HPC bulb-tee girders : interim report.

    DOT National Transportation Integrated Search

    2003-10-01

    Three 96-ft (29.3-m) long, 72-in. (1.83-m) deep, precast, pretensioned bulb-tee girders were tested to evaluate behavior under flexural fatigue and static shear loadings. The three girders had a design concrete compressive strength of 10,000 psi (69....

  6. 76 FR 14559 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...

  7. Interim Administrators in Higher Education: A National Study

    ERIC Educational Resources Information Center

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  8. Remediation management of complex sites using an adaptive site management approach.

    PubMed

    Price, John; Spreng, Carl; Hawley, Elisabeth L; Deeb, Rula

    2017-12-15

    Complex sites require a disproportionate amount of resources for environmental remediation and long timeframes to achieve remediation objectives, due to their complex geologic conditions, hydrogeologic conditions, geochemical conditions, contaminant-related conditions, large scale of contamination, and/or non-technical challenges. A recent team of state and federal environmental regulators, federal agency representatives, industry experts, community stakeholders, and academia worked together as an Interstate Technology & Regulatory Council (ITRC) team to compile resources and create new guidance on the remediation management of complex sites. This article summarizes the ITRC team's recommended process for addressing complex sites through an adaptive site management approach. The team provided guidance for site managers and other stakeholders to evaluate site complexities and determine site remediation potential, i.e., whether an adaptive site management approach is warranted. Adaptive site management was described as a comprehensive, flexible approach to iteratively evaluate and adjust the remedial strategy in response to remedy performance. Key aspects of adaptive site management were described, including tools for revising and updating the conceptual site model (CSM), the importance of setting interim objectives to define short-term milestones on the journey to achieving site objectives, establishing a performance model and metrics to evaluate progress towards meeting interim objectives, and comparing actual with predicted progress during scheduled periodic evaluations, and establishing decision criteria for when and how to adapt/modify/revise the remedial strategy in response to remedy performance. Key findings will be published in an ITRC Technical and Regulatory guidance document in 2017 and free training webinars will be conducted. More information is available at www.itrc-web.org. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. A Systems Analysis of the Library and Information Science Statistical Data System: The Preliminary Study. Interim Report.

    ERIC Educational Resources Information Center

    Hamburg, Morris; And Others

    The long-term goal of this investigation is to design and establish a national model for a system of library statistical data. This is a report on The Preliminary Study which was carried out over an 11-month period ending May, 1969. The objective of The Preliminary Study was to design and delimit The Research Investigation in the most efficient…

  10. Scenarios and performance measures for advanced ISDN satellite design and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.

    1991-01-01

    Described here are the contemplated input and expected output for the Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) and Full Service ISDN Satellite (FSIS) Models. The discrete event simulations of these models are presented with specific scenarios that stress ISDN satellite parameters. Performance measure criteria are presented for evaluating the advanced ISDN communication satellite designs of the NASA Satellite Communications Research (SCAR) Program.

  11. Panasonic Small Cell Testing for AHPS

    NASA Technical Reports Server (NTRS)

    Pearson, C.; Blackmore, P.; Lain, M.; Walpole, A.; Darcy, Eric

    2006-01-01

    AEA selection and successful Interim Design Review for AHPS proves maturity of small cell approach for very large batteries. Cells show excellent opportunity for battery mass reduction for AHPS and other low cycle applications. Lack of cycle and extended calendar life make EOL battery performance difficult (AHPS 8 year mission). Preliminary design, AEA retained SONY 18650HC cell as baseline: a) Well characterized performance; b) Wealth of safety test data.

  12. ITER Cryoplant Infrastructures

    NASA Astrophysics Data System (ADS)

    Fauve, E.; Monneret, E.; Voigt, T.; Vincent, G.; Forgeas, A.; Simon, M.

    2017-02-01

    The ITER Tokamak requires an average 75 kW of refrigeration power at 4.5 K and 600 kW of refrigeration Power at 80 K to maintain the nominal operation condition of the ITER thermal shields, superconducting magnets and cryopumps. This is produced by the ITER Cryoplant, a complex cluster of refrigeration systems including in particular three identical Liquid Helium Plants and two identical Liquid Nitrogen Plants. Beyond the equipment directly part of the Cryoplant, colossal infrastructures are required. These infrastructures account for a large part of the Cryoplants lay-out, budget and engineering efforts. It is ITER Organization responsibility to ensure that all infrastructures are adequately sized and designed to interface with the Cryoplant. This proceeding presents the overall architecture of the cryoplant. It provides order of magnitude related to the cryoplant building and utilities: electricity, cooling water, heating, ventilation and air conditioning (HVAC).

  13. Fostering community understanding of sufficient benefit and early stopping for a phase 2B HIV prevention clinical trial in Africa.

    PubMed

    White, Rhonda; Chileshe, Modesta; Dawson, Liza; Donnell, Deborah; Hillier, Sharon; Morar, Neetha; Noguchi, Lisa; Dixon, Dennis

    2011-02-01

    Most trials of interventions are designed to address the traditional null hypothesis of no benefit. VOICE, a phase 2B HIV prevention trial funded by NIH and conducted in Africa, is designed to assess if the intervention will prevent a substantial fraction of infections. Planned interim analysis may provide conclusive evidence against the traditional null hypothesis without establishing substantial benefit. At this interim point, the Data and Safety Monitoring Board would then face the dilemma of knowing the product has some positive effect, but perhaps not as great an effect as the protocol has declared necessary. In March 2008, NIH program staff recommended that the VOICE protocol team discuss the stopping rules with stakeholders prior to initiating the protocol. The goals of the workshop were to inform community representatives about the potential ethical dilemma associated with stopping rules and engage in dialogue about these issues. We describe the resulting community consultation and summarize the outcomes. A 2-day workshop was convened with the goal of having a clear and transparent consultation with the stakeholders around the question, 'Given emerging evidence that a product could prevent some infections, would the community support a decision to continue accruing to the trial?' Participants included research staff and community stakeholders. Lectures with visual aids, discussions, and exercises using interactive learning tasks were used, with a focus on statistics and interpreting data from trials, particularly interim data. Results of oral and written evaluations by participants were reviewed. The feedback was mostly positive, with some residual confusion regarding statistical concepts. However, discussions with attendees later revealed that not all felt prepared to engage fully in the workshop. This was the presenters' first experience facilitating a formal discussion with an audience that had no advanced science, research, or mathematics training. Community representatives' concern regarding speaking for their communities without consulting them also created a challenge for the workshop. Open discussion around trial stopping rules requires that all discussants have an understanding of trial design concepts and feel a sense of empowerment to ask and answer questions. The VOICE CWG workshop was a first step toward the goal of open discussion regarding trial stopping rules and interim results for the study; however, ongoing education and dialogue must occur to ensure that all stakeholders fully participate in the process.

  14. Wide Field Infrared Survey Telescope [WFIRST]: Telescope Design and Simulated Performance

    NASA Technical Reports Server (NTRS)

    Goullioud, R.; Content, D. A.; Kuan, G. M.; Moore, J. D.; Chang, Z.; Sunada, E. T.; Villalvazo, J.; Hawk, J. P.; Armani, N. V.; Johnson, E. L.; hide

    2012-01-01

    The ASTRO2010 Decadal Survey proposed multiple missions with NIR focal planes and 3 mirror wide field telescopes in the 1.5m aperture range. None of them would have won as standalone missions WFIRST is a combination of these missions, created by Astro 2010 committee. WFIRST Science Definition Team (SDT) tasked to examine the design. Project team is a GSFC-JPL-Caltech collaboration. This interim mission design is a result of combined work by the project team with the SDT.

  15. LINER FOR EXTRUSION BILLET CONTAINERS. Interim Technical Documentary Progress Report, June 5, 1962-September 5, 1962

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spachner, S.A.

    1962-10-31

    A container-sleeve-liner assembly was designed which will provide adequate support for ceramic, ceramic coated metal, or metal liners. The design minimizes mechanical property requirements of liner materials, and permits rapid removal of worn or damaged liners. A high-strength stem was designed and fabricated. Technical literature on high-strength materials was reviewed, and high-strength materials producers were contacted to locate sources and assess applicability of existing materials for refractory metal extrusion liner use. (auth)

  16. Application of Lanczos vectors to control design of flexible structures, part 2

    NASA Technical Reports Server (NTRS)

    Craig, Roy R., Jr.; Su, Tzu-Jeng

    1992-01-01

    This report covers the period of the grant from January 1991 until its expiration in June 1992. Together with an Interim Report (Ref. 9), it summarizes the research conducted under NASA Grant NAG9-357 on the topic 'Application of Lanczos Vectors to Control Design of Flexible Structures.' The research concerns various ways to obtain reduced-order mathematical models of complex structures for use in dynamics analysis and in the design of control systems for these structures. This report summarizes the research.

  17. Conceptual design of the ITER fast-ion loss detector.

    PubMed

    Garcia-Munoz, M; Kocan, M; Ayllon-Guerola, J; Bertalot, L; Bonnet, Y; Casal, N; Galdon, J; Garcia Lopez, J; Giacomin, T; Gonzalez-Martin, J; Gunn, J P; Jimenez-Ramos, M C; Kiptily, V; Pinches, S D; Rodriguez-Ramos, M; Reichle, R; Rivero-Rodriguez, J F; Sanchis-Sanchez, L; Snicker, A; Vayakis, G; Veshchev, E; Vorpahl, Ch; Walsh, M; Walton, R

    2016-11-01

    A conceptual design of a reciprocating fast-ion loss detector for ITER has been developed and is presented here. Fast-ion orbit simulations in a 3D magnetic equilibrium and up-to-date first wall have been carried out to revise the measurement requirements for the lost alpha monitor in ITER. In agreement with recent observations, the simulations presented here suggest that a pitch-angle resolution of ∼5° might be necessary to identify the loss mechanisms. Synthetic measurements including realistic lost alpha-particle as well as neutron and gamma fluxes predict scintillator signal-to-noise levels measurable with standard light acquisition systems with the detector aperture at ∼11 cm outside of the diagnostic first wall. At measurement position, heat load on detector head is comparable to that in present devices.

  18. In-vacuum sensors for the beamline components of the ITER neutral beam test facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dalla Palma, M., E-mail: mauro.dallapalma@igi.cnr.it; Pasqualotto, R.; Spagnolo, S.

    2016-11-15

    Embedded sensors have been designed for installation on the components of the MITICA beamline, the prototype ITER neutral beam injector (Megavolt ITER Injector and Concept Advancement), to derive characteristics of the particle beam and to monitor the component conditions during operation for protection and thermal control. Along the beamline, the components interacting with the particle beam are the neutralizer, the residual ion dump, and the calorimeter. The design and the positioning of sensors on each component have been developed considering the expected beam-surface interaction including non-ideal and off-normal conditions. The arrangement of the following instrumentation is presented: thermal sensors, strainmore » gages, electrostatic probes including secondary emission detectors, grounding shunt for electrical currents, and accelerometers.« less

  19. Fixed-point Design of the Lattice-reduction-aided Iterative Detection and Decoding Receiver for Coded MIMO Systems

    DTIC Science & Technology

    2011-01-01

    reliability, e.g., Turbo Codes [2] and Low Density Parity Check ( LDPC ) codes [3]. The challenge to apply both MIMO and ECC into wireless systems is on...REPORT Fixed-point Design of theLattice-reduction-aided Iterative Detection andDecoding Receiver for Coded MIMO Systems 14. ABSTRACT 16. SECURITY...illustrates the performance of coded LR aided detectors. 1. REPORT DATE (DD-MM-YYYY) 4. TITLE AND SUBTITLE 13. SUPPLEMENTARY NOTES The views, opinions

  20. Fast generating Greenberger-Horne-Zeilinger state via iterative interaction pictures

    NASA Astrophysics Data System (ADS)

    Huang, Bi-Hua; Chen, Ye-Hong; Wu, Qi-Cheng; Song, Jie; Xia, Yan

    2016-10-01

    We delve a little deeper into the construction of shortcuts to adiabatic passage for three-level systems by iterative interaction picture (multiple Schrödinger dynamics). As an application example, we use the deduced iterative based shortcuts to rapidly generate the Greenberger-Horne-Zeilinger (GHZ) state in a three-atom system with the help of quantum Zeno dynamics. Numerical simulation shows the dynamics designed by the iterative picture method is physically feasible and the shortcut scheme performs much better than that using the conventional adiabatic passage techniques. Also, the influences of various decoherence processes are discussed by numerical simulation and the results prove that the scheme is fast and robust against decoherence and operational imperfection.

  1. Design, fabrication and test of block 4 design solar cell modules. Part 2: Residential module

    NASA Technical Reports Server (NTRS)

    Jester, T. L.

    1982-01-01

    Design, fabrication and test of the Block IV residential load module are reported. Design changes from the proposed module design through three iterations to the discontinuance of testing are outlined.

  2. The PRIMA Test Facility: SPIDER and MITICA test-beds for ITER neutral beam injectors

    NASA Astrophysics Data System (ADS)

    Toigo, V.; Piovan, R.; Dal Bello, S.; Gaio, E.; Luchetta, A.; Pasqualotto, R.; Zaccaria, P.; Bigi, M.; Chitarin, G.; Marcuzzi, D.; Pomaro, N.; Serianni, G.; Agostinetti, P.; Agostini, M.; Antoni, V.; Aprile, D.; Baltador, C.; Barbisan, M.; Battistella, M.; Boldrin, M.; Brombin, M.; Dalla Palma, M.; De Lorenzi, A.; Delogu, R.; De Muri, M.; Fellin, F.; Ferro, A.; Fiorentin, A.; Gambetta, G.; Gnesotto, F.; Grando, L.; Jain, P.; Maistrello, A.; Manduchi, G.; Marconato, N.; Moresco, M.; Ocello, E.; Pavei, M.; Peruzzo, S.; Pilan, N.; Pimazzoni, A.; Recchia, M.; Rizzolo, A.; Rostagni, G.; Sartori, E.; Siragusa, M.; Sonato, P.; Sottocornola, A.; Spada, E.; Spagnolo, S.; Spolaore, M.; Taliercio, C.; Valente, M.; Veltri, P.; Zamengo, A.; Zaniol, B.; Zanotto, L.; Zaupa, M.; Boilson, D.; Graceffa, J.; Svensson, L.; Schunke, B.; Decamps, H.; Urbani, M.; Kushwah, M.; Chareyre, J.; Singh, M.; Bonicelli, T.; Agarici, G.; Garbuglia, A.; Masiello, A.; Paolucci, F.; Simon, M.; Bailly-Maitre, L.; Bragulat, E.; Gomez, G.; Gutierrez, D.; Mico, G.; Moreno, J.-F.; Pilard, V.; Kashiwagi, M.; Hanada, M.; Tobari, H.; Watanabe, K.; Maejima, T.; Kojima, A.; Umeda, N.; Yamanaka, H.; Chakraborty, A.; Baruah, U.; Rotti, C.; Patel, H.; Nagaraju, M. V.; Singh, N. P.; Patel, A.; Dhola, H.; Raval, B.; Fantz, U.; Heinemann, B.; Kraus, W.; Hanke, S.; Hauer, V.; Ochoa, S.; Blatchford, P.; Chuilon, B.; Xue, Y.; De Esch, H. P. L.; Hemsworth, R.; Croci, G.; Gorini, G.; Rebai, M.; Muraro, A.; Tardocchi, M.; Cavenago, M.; D'Arienzo, M.; Sandri, S.; Tonti, A.

    2017-08-01

    The ITER Neutral Beam Test Facility (NBTF), called PRIMA (Padova Research on ITER Megavolt Accelerator), is hosted in Padova, Italy and includes two experiments: MITICA, the full-scale prototype of the ITER heating neutral beam injector, and SPIDER, the full-size radio frequency negative-ions source. The NBTF realization and the exploitation of SPIDER and MITICA have been recognized as necessary to make the future operation of the ITER heating neutral beam injectors efficient and reliable, fundamental to the achievement of thermonuclear-relevant plasma parameters in ITER. This paper reports on design and R&D carried out to construct PRIMA, SPIDER and MITICA, and highlights the huge progress made in just a few years, from the signature of the agreement for the NBTF realization in 2011, up to now—when the buildings and relevant infrastructures have been completed, SPIDER is entering the integrated commissioning phase and the procurements of several MITICA components are at a well advanced stage.

  3. Design Approaches to Support Preservice Teachers in Scientific Modeling

    NASA Astrophysics Data System (ADS)

    Kenyon, Lisa; Davis, Elizabeth A.; Hug, Barbara

    2011-02-01

    Engaging children in scientific practices is hard for beginning teachers. One such scientific practice with which beginning teachers may have limited experience is scientific modeling. We have iteratively designed preservice teacher learning experiences and materials intended to help teachers achieve learning goals associated with scientific modeling. Our work has taken place across multiple years at three university sites, with preservice teachers focused on early childhood, elementary, and middle school teaching. Based on results from our empirical studies supporting these design decisions, we discuss design features of our modeling instruction in each iteration. Our results suggest some successes in supporting preservice teachers in engaging students in modeling practice. We propose design principles that can guide science teacher educators in incorporating modeling in teacher education.

  4. Parametric Thermal and Flow Analysis of ITER Diagnostic Shield Module

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khodak, A.; Zhai, Y.; Wang, W.

    As part of the diagnostic port plug assembly, the ITER Diagnostic Shield Module (DSM) is designed to provide mechanical support and the plasma shielding while allowing access to plasma diagnostics. Thermal and hydraulic analysis of the DSM was performed using a conjugate heat transfer approach, in which heat transfer was resolved in both solid and liquid parts, and simultaneously, fluid dynamics analysis was performed only in the liquid part. ITER Diagnostic First Wall (DFW) and cooling tubing were also included in the analysis. This allowed direct modeling of the interface between DSM and DFW, and also direct assessment of themore » coolant flow distribution between the parts of DSM and DFW to ensure DSM design meets the DFW cooling requirements. Design of the DSM included voids filled with Boron Carbide pellets, allowing weight reduction while keeping shielding capability of the DSM. These voids were modeled as a continuous solid with smeared material properties using analytical relation for thermal conductivity. Results of the analysis lead to design modifications improving heat transfer efficiency of the DSM. Furthermore, the effect of design modifications on thermal performance as well as effect of Boron Carbide will be presented.« less

  5. Parametric Thermal and Flow Analysis of ITER Diagnostic Shield Module

    DOE PAGES

    Khodak, A.; Zhai, Y.; Wang, W.; ...

    2017-06-19

    As part of the diagnostic port plug assembly, the ITER Diagnostic Shield Module (DSM) is designed to provide mechanical support and the plasma shielding while allowing access to plasma diagnostics. Thermal and hydraulic analysis of the DSM was performed using a conjugate heat transfer approach, in which heat transfer was resolved in both solid and liquid parts, and simultaneously, fluid dynamics analysis was performed only in the liquid part. ITER Diagnostic First Wall (DFW) and cooling tubing were also included in the analysis. This allowed direct modeling of the interface between DSM and DFW, and also direct assessment of themore » coolant flow distribution between the parts of DSM and DFW to ensure DSM design meets the DFW cooling requirements. Design of the DSM included voids filled with Boron Carbide pellets, allowing weight reduction while keeping shielding capability of the DSM. These voids were modeled as a continuous solid with smeared material properties using analytical relation for thermal conductivity. Results of the analysis lead to design modifications improving heat transfer efficiency of the DSM. Furthermore, the effect of design modifications on thermal performance as well as effect of Boron Carbide will be presented.« less

  6. Effects of Discovery, Iteration, and Collaboration in Laboratory Courses on Undergraduates' Research Career Intentions Fully Mediated by Student Ownership.

    PubMed

    Corwin, Lisa A; Runyon, Christopher R; Ghanem, Eman; Sandy, Moriah; Clark, Greg; Palmer, Gregory C; Reichler, Stuart; Rodenbusch, Stacia E; Dolan, Erin L

    2018-06-01

    Course-based undergraduate research experiences (CUREs) provide a promising avenue to attract a larger and more diverse group of students into research careers. CUREs are thought to be distinctive in offering students opportunities to make discoveries, collaborate, engage in iterative work, and develop a sense of ownership of their lab course work. Yet how these elements affect students' intentions to pursue research-related careers remain unexplored. To address this knowledge gap, we collected data on three design features thought to be distinctive of CUREs (discovery, iteration, collaboration) and on students' levels of ownership and career intentions from ∼800 undergraduates who had completed CURE or inquiry courses, including courses from the Freshman Research Initiative (FRI), which has a demonstrated positive effect on student retention in college and in science, technology, engineering, and mathematics. We used structural equation modeling to test relationships among the design features and student ownership and career intentions. We found that discovery, iteration, and collaboration had small but significant effects on students' intentions; these effects were fully mediated by student ownership. Students in FRI courses reported significantly higher levels of discovery, iteration, and ownership than students in other CUREs. FRI research courses alone had a significant effect on students' career intentions.

  7. Fusion Breeding for Sustainable, Mid Century, Carbon Free Power

    NASA Astrophysics Data System (ADS)

    Manheimer, Wallace

    2015-11-01

    If ITER achieves Q ~10, it is still very far from useful fusion. The fusion power, and the driver power will allow only a small amount of power to be delivered, <~50MW for an ITER scale tokamak. It is unlikely, considering ``conservative design rules'' that tokamaks can ever be economical pure fusion power producers. Considering the status of other magnetic fusion concepts, it is also very unlikely that any alternate concept will either. Laser fusion does not seem to be constrained by any conservative design rules, but considering the failure of NIF to achhieve ignition, at this point it has many more obstacles to overcome than magnetic fusion. One way out of this dilemma is to use an ITER size tokamak, or a NIF size laser, as a fuel breeder for searate nuclear reactors. Hence ITER and NIF become ends in themselves, instead of steps to who knows what DEMO decades later. Such a tokamak can easily live within the consrtaints of conservative design rules. This has led the author to propose ``The Energy Park'' a sustainable, carbon free, economical, and environmently viable power source without prolifertion risk. It is one fusion breeder fuels 5 conventional nuclear reactors, and one fast neutron reactor burns the actinide wastes.

  8. Design of the ITER Electron Cyclotron Heating and Current Drive Waveguide Transmission Line

    NASA Astrophysics Data System (ADS)

    Bigelow, T. S.; Rasmussen, D. A.; Shapiro, M. A.; Sirigiri, J. R.; Temkin, R. J.; Grunloh, H.; Koliner, J.

    2007-11-01

    The ITER ECH transmission line system is designed to deliver the power, from twenty-four 1 MW 170 GHz gyrotrons and three 1 MW 127.5 GHz gyrotrons, to the equatorial and upper launchers. The performance requirements, initial design of components and layout between the gyrotrons and the launchers is underway. Similar 63.5 mm ID corrugated waveguide systems have been built and installed on several fusion experiments; however, none have operated at the high frequency and long-pulse required for ITER. Prototype components are being tested at low power to estimate ohmic and mode conversion losses. In order to develop and qualify the ITER components prior to procurement of the full set of 24 transmission lines, a 170 GHz high power test of a complete prototype transmission line is planned. Testing of the transmission line at 1-2 MW can be performed with a modest power (˜0.5 MW) tube with a low loss (10-20%) resonant ring configuration. A 140 GHz long pulse, 400 kW gyrotron will be used in the initial tests and a 170 GHz gyrotron will be used when it becomes available. Oak Ridge National Laboratory, managed by UT-Battelle, LLC, for the U.S. Dept. of Energy under contract DE-AC05-00OR22725.

  9. Iterative learning-based decentralized adaptive tracker for large-scale systems: a digital redesign approach.

    PubMed

    Tsai, Jason Sheng-Hong; Du, Yan-Yi; Huang, Pei-Hsiang; Guo, Shu-Mei; Shieh, Leang-San; Chen, Yuhua

    2011-07-01

    In this paper, a digital redesign methodology of the iterative learning-based decentralized adaptive tracker is proposed to improve the dynamic performance of sampled-data linear large-scale control systems consisting of N interconnected multi-input multi-output subsystems, so that the system output will follow any trajectory which may not be presented by the analytic reference model initially. To overcome the interference of each sub-system and simplify the controller design, the proposed model reference decentralized adaptive control scheme constructs a decoupled well-designed reference model first. Then, according to the well-designed model, this paper develops a digital decentralized adaptive tracker based on the optimal analog control and prediction-based digital redesign technique for the sampled-data large-scale coupling system. In order to enhance the tracking performance of the digital tracker at specified sampling instants, we apply the iterative learning control (ILC) to train the control input via continual learning. As a result, the proposed iterative learning-based decentralized adaptive tracker not only has robust closed-loop decoupled property but also possesses good tracking performance at both transient and steady state. Besides, evolutionary programming is applied to search for a good learning gain to speed up the learning process of ILC. Copyright © 2011 ISA. Published by Elsevier Ltd. All rights reserved.

  10. Cold Test and Performance Evaluation of Prototype Cryoline-X

    NASA Astrophysics Data System (ADS)

    Shah, N.; Choukekar, K.; Kapoor, H.; Muralidhara, S.; Garg, A.; Kumar, U.; Jadon, M.; Dash, B.; Bhattachrya, R.; Badgujar, S.; Billot, V.; Bravais, P.; Cadeau, P.

    2017-12-01

    The multi-process pipe vacuum jacketed cryolines for the ITER project are probably world’s most complex cryolines in terms of layout, load cases, quality, safety and regulatory requirements. As a risk mitigation plan, design, manufacturing and testing of prototype cryoline (PTCL) was planned before the approval of final design of ITER cryolines. The 29 meter long PTCL consist of 6 process pipes encased by thermal shield inside Outer Vacuum Jacket of DN 600 size and carries cold helium at 4.5 K and 80 K. The global heat load limit was defined as 1.2 W/m at 4.5 K and 4.5 W/m at 80 K. The PTCL-X (PTCL for Group-X cryolines) was specified in detail by ITER-India and designed as well as manufactured by Air Liquide. PTCL-X was installed and tested at cryogenic temperature at ITER-India Cryogenic Laboratory in 2016. The heat load at 4.5 K and 80 K, estimated using enthalpy difference method, was found to be approximately 0.8 W/m at 4.5 K, 4.2 W/m at 80 K, which is well within the defined limits. Thermal shield temperature profile was also found to be satisfactory. Paper summarizes the cold test results of PTCL-X

  11. Interim estimates of the effectiveness of the influenza vaccine against A(H3N2) influenza in adults in South Korea, 2016-2017 season.

    PubMed

    Noh, Ji Yun; Lim, Sooyeon; Song, Joon Young; Choi, Won Suk; Jeong, Hye Won; Heo, Jung Yeon; Lee, Jacob; Seo, Yu Bin; Lee, Jin-Soo; Wie, Seong Heon; Kim, Young Keun; Park, Kyung Hwa; Jung, Sook-In; Kim, Shin Woo; Lee, Sun Hee; Lee, Han Sol; Yoon, Young Hoon; Cheong, Hee Jin; Kim, Woo Joo

    2017-01-01

    In the 2016-2017 season, the A(H3N2) influenza epidemic presented an unusual early peak pattern compared with past seasons in South Korea. The interim vaccine effectiveness (VE) of influenza vaccination in preventing laboratory-confirmed influenza was estimated using test-negative design through the tertiary hospital-based influenza surveillance system in South Korea. From 1 September, 2016 to 7 January, 2017, adjusted VE of influenza vaccination in preventing laboratory-confirmed A(H3N2) was -52.1% (95% confidence interval [CI], -147.2 to 6.4); -70.0% (95% CI, -212.0 to 7.4) in 19-64 years and 4.3% (95% CI, -137.8 to 61.5) in the elderly. Circulating A(H3N2) viruses belonged to the three phylogenetic subclades of 3C.2a, differently to A/Hong Kong/4801/2014, the current vaccine strain. Amino acid substitutions in hemagglutinin of circulating viruses seem to contribute to low VE. In conclusion, interim VE analysis presented that the protection of laboratory-confirmed influenza by seasonal influenza vaccination did not show the statistical significance in South Korea in the 2016-2017 influenza season.

  12. 24 CFR 35.120 - Options.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Options. 35.120 Section 35.120... and Definitions for All Programs. § 35.120 Options. (a) Standard treatments. Where interim controls are required by this part, the designated party has the option to presume that lead-based paint or...

  13. 40 CFR 265.221 - Design and operating requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... effective date of a prohibition pursuant to § 268.5 of this chapter, within this 48-month period. [50 FR... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... each replacement of an existing surface impoundment unit must install two or more liners, and a...

  14. 40 CFR 265.221 - Design and operating requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... effective date of a prohibition pursuant to § 268.5 of this chapter, within this 48-month period. [50 FR... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... each replacement of an existing surface impoundment unit must install two or more liners, and a...

  15. 40 CFR 265.221 - Design and operating requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... effective date of a prohibition pursuant to § 268.5 of this chapter, within this 48-month period. [50 FR... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... each replacement of an existing surface impoundment unit must install two or more liners, and a...

  16. 40 CFR 265.221 - Design and operating requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... effective date of a prohibition pursuant to § 268.5 of this chapter, within this 48-month period. [50 FR... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... each replacement of an existing surface impoundment unit must install two or more liners, and a...

  17. 40 CFR 265.221 - Design and operating requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... effective date of a prohibition pursuant to § 268.5 of this chapter, within this 48-month period. [50 FR... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... each replacement of an existing surface impoundment unit must install two or more liners, and a...

  18. 75 FR 34282 - Federal Acquisition Regulation; FAR Case 2009-014, New Designated Country-Taiwan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... Government Procurement. DATES: Effective Date: June 16, 2010. FOR FURTHER INFORMATION CONTACT: Ms. Lori... Government Procurement. The interim rule added Taiwan to the list of World Trade Organization Government... seq., because, although this rule opens up Government procurement to the goods and services of Taiwan...

  19. An Intelligent CAI Monitor and Generative Tutor. Interim Report.

    ERIC Educational Resources Information Center

    Koffman, Elliot B.; And Others

    Design techniques for generative computer-assisted-instructional (CAI) systems are described in this report. These are systems capable of generating problems for students and of deriving and monitoring solutions; problem difficulty, instructional pace, and depth of monitoring are all individually tailored and parts of the solution algorithms can…

  20. The Challenges in Developing VET Competencies in E-Commerce.

    ERIC Educational Resources Information Center

    Mitchell, John

    A formative evaluation was begun of an innovative project funded by the Australian National Training Authority (ANTA) to develop competencies and qualifications in e-commerce. The formative evaluation was designed to focus on inputs, processes, and interim outputs, identifying both good practice and areas for improvement. Findings to date…

  1. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...

  2. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...

  3. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...

  4. Futures in Business. Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg.

    This guide is designed for use by instructors teaching a six-unit course on futures in business. Presented first is a diagram illustrating the place of the course in Manitoba's business education curriculum. The academic, personal management, and teamwork skills that have been deemed critical employability skills required of the Canadian work…

  5. School, Work and Family Planning. Interim Impacts in Project Redirection.

    ERIC Educational Resources Information Center

    Polit, Denise F.; And Others

    Project Redirection was designed to help pregnant and parenting adolescents progress toward eventual self-sufficiency by linking them with community agencies and volunteers at four geographically and ethnically diverse sites in the United States. Distinctive features of the program include: (1) a broad scope of services including employability…

  6. Physics 200, 300 Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education, Winnipeg.

    This guide, developed for the physics 200, 300 program in Manitoba, is designed to articulate with previous science courses; provide concepts, processes, and skills which will enable students to continue in physics-related areas; and relate physics to practical applications in everyday life. It includes a program overview (with program goals and…

  7. 77 FR 72683 - Sweet Cherries Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... marketing order now in effect, Washington sweet cherry handlers are subject to assessments. Funds to... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 923 [Doc. No. AMS-FV-12-0026... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY...

  8. Chemistry 200, 300 Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education, Winnipeg.

    This guide, developed for the chemistry 200, 300 program in Manitoba, is designed to articulate with previous science courses, provide concepts, processes, and skills which will enable students to continue in chemistry-related areas, and relate chemistry to practical applications in everyday life. It includes a program overview (with program goals…

  9. 77 FR 30002 - Primary Power, LLC v. PJM Interconnection, LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... Respondent) for the Respondent's failure to designate the Complainant to construct, own, and finance two static VAR compensator (``SVC'') projects sponsored by the Complainant that have been included in the PJM Regional Transmission Expansion Plan. The Complainant requests that the Commission grant emergency, interim...

  10. The National Study of Charter Management Organization (CMO) Effectiveness. Report on Interim Findings

    ERIC Educational Resources Information Center

    Lake, Robin; Dusseault, Brianna; Bowen, Melissa; Demeritt, Allison; Hill, Paul

    2010-01-01

    The National Study of CMO (charter management organizations) Effectiveness is a national, longitudinal research effort designed to measure how nonprofit charter school management organizations (CMOs) affect student achievement, and to examine the internal structures, practices, and policy contexts that may influence these outcomes. The study began…

  11. 78 FR 21520 - Sweet Cherries Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 923 [Doc. No. AMS-FV-12-0026... AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY... decreased the assessment rate established for the Washington Cherry Marketing Committee (Committee) for the...

  12. Reading First Implementation Evaluation: Interim Report

    ERIC Educational Resources Information Center

    Moss, Marc; Jacob, Robin; Boulay, Beth; Horst, Megan; Poulos, Jennifer

    2006-01-01

    In October 2003, the US Department of Education contracted with Abt Associates to design and conduct the Reading First Implementation Evaluation. This report focuses on the following questions: (1) How is the Reading First program implemented in districts and schools? and (2) How does reading instruction differ in Reading First schools and…

  13. Radon Reduction Techniques in Schools: Interim Technical Guidance.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC.

    This technical document is intended to assist school facilities maintenance personnel in the selection, design, and operation of radon reduction systems in schools. The guidance contained in this document is based largely on research conducted in 1987 and 1988 in schools located in Maryland and Virginia. Researchers from the United States…

  14. 78 FR 51138 - Partial Cancellation of Fremont Grain Inspection Department Inc. Designation; Selection of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... to provide official inspection service through June 30, 2016, under the United States Grain Standards Act (USGSA), as amended. Fremont informed the Grain Inspection, Packers and Stockyards Administration... Service Company as the interim provider effective August 1, 2013 until a permanent designee is selected...

  15. 78 FR 21518 - Apricots Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Doc. No. AMS-FV-12-0027...: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY: The... the assessment rate established for the Washington Apricot Marketing Committee (Committee) for the...

  16. The Development of a Vocational Diagnostic Program. Interim Report.

    ERIC Educational Resources Information Center

    Barnard, William W.

    A five-phased project is described which was designed to develop more specific diagnostic procedures and instrumentation that would allow both the vocational counselor and the prospective student to determine more effectively specific occupational programs and occupational objectives for education at the postsecondary level. Phases of the project…

  17. CNN Newsroom Classroom Guides, February 2002.

    ERIC Educational Resources Information Center

    Cable News Network, Atlanta, GA.

    These classroom guides, designed to accompany the daily CNN (Cable News Network) Newsroom broadcasts for the month of February 2002, provide program rundowns, suggestions for class activities and discussion, student handouts, and a list of related news terms. Top stories include: Afghanistan's interim leader is making a global impression (February…

  18. Start Your Own Business. Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg.

    This guide is designed for use by instructors teaching a 12-unit course in starting a business. Presented first is a diagram illustrating the place of the course in Manitoba's business education curriculum. The academic, personal management, and teamwork skills that have been deemed critical employability skills required of the Canadian work force…

  19. 32 CFR 644.43 - Gross appraisals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... HANDBOOK Appraisal § 644.43 Gross appraisals. (a) Preparation. (1) The gross appraisal sections of real...-type or brief real estate design memoranda on civil works projects are submitted, comparable sales data... issued on the same project and if values have changed in the interim, additional sales data submitted to...

  20. 32 CFR 644.43 - Gross appraisals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... HANDBOOK Appraisal § 644.43 Gross appraisals. (a) Preparation. (1) The gross appraisal sections of real...-type or brief real estate design memoranda on civil works projects are submitted, comparable sales data... issued on the same project and if values have changed in the interim, additional sales data submitted to...

  1. U.S. Metric Study Interim Report: Nonmanufacturing Businesses.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    This is the fifth in a series of reports from the U. S. Metric Study, conducted by the National Bureau of Standards, designed to cover the nonmanufacturing segment of the economy representing about 65 percent of the total U. S. employment: mining, agriculture, forestry, fisheries, construction, transportation, communications, utilities,…

  2. 78 FR 62963 - Apricots Grown in Designated Counties in Washington; Suspension of Handling Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Doc. No. AMS-FV-13-0040... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY... under the Washington apricot marketing order (order) for the remainder of the 2013-2014 fiscal period...

  3. Interim report on roughness measurement of elevated roadway sections : I-10 Laplace - Kenner, I-10 Henderson - Grosse Tete.

    DOT National Transportation Integrated Search

    1973-09-01

    Two sections of Interstate 10 have been selected for study to determine the initial roughness and subsequent change in roughness with time. The two sections represent different design and construction procedures. : Section 1 is located on I-10 betwee...

  4. Conceptual design of the DEMO neutral beam injectors: main developments and R&D achievements

    NASA Astrophysics Data System (ADS)

    Sonato, P.; Agostinetti, P.; Bolzonella, T.; Cismondi, F.; Fantz, U.; Fassina, A.; Franke, T.; Furno, I.; Hopf, C.; Jenkins, I.; Sartori, E.; Tran, M. Q.; Varje, J.; Vincenzi, P.; Zanotto, L.

    2017-05-01

    The objectives of the nuclear fusion power plant DEMO, to be built after the ITER experimental reactor, are usually understood to lie somewhere between those of ITER and a ‘first of a kind’ commercial plant. Hence, in DEMO the issues related to efficiency and RAMI (reliability, availability, maintainability and inspectability) are among the most important drivers for the design, as the cost of the electricity produced by this power plant will strongly depend on these aspects. In the framework of the EUROfusion Work Package Heating and Current Drive within the Power Plant Physics and Development activities, a conceptual design of the neutral beam injector (NBI) for the DEMO fusion reactor has been developed by Consorzio RFX in collaboration with other European research institutes. In order to improve efficiency and RAMI aspects, several innovative solutions have been introduced in comparison to the ITER NBI, mainly regarding the beam source, neutralizer and vacuum pumping systems.

  5. A Burning Plasma Experiment: the role of international collaboration

    NASA Astrophysics Data System (ADS)

    Prager, Stewart

    2003-04-01

    The world effort to develop fusion energy is at the threshold of a new stage in its research: the investigation of burning plasmas. A burning plasma is self-heated. The 100 million degree temperature of the plasma is maintained by the heat generated by the fusion reactions themselves, as occurs in burning stars. The fusion-generated alpha particles produce new physical phenomena that are strongly coupled together as a nonlinear complex system, posing a major plasma physics challenge. Two attractive options are being considered by the US fusion community as burning plasma facilities: the international ITER experiment and the US-based FIRE experiment. ITER (the International Thermonuclear Experimental Reactor) is a large, power-plant scale facility. It was conceived and designed by a partnership of the European Union, Japan, the Soviet Union, and the United States. At the completion of the first engineering design in 1998, the US discontinued its participation. FIRE (the Fusion Ignition Research Experiment) is a smaller, domestic facility that is at an advanced pre-conceptual design stage. Each facility has different scientific, programmatic and political implications. Selecting the optimal path for burning plasma science is itself a challenge. Recently, the Fusion Energy Sciences Advisory Committee recommended a dual path strategy in which the US seek to rejoin ITER, but be prepared to move forward with FIRE if the ITER negotiations do not reach fruition by July, 2004. Either the ITER or FIRE experiment would reveal the behavior of burning plasmas, generate large amounts of fusion power, and be a huge step in establishing the potential of fusion energy to contribute to the world's energy security.

  6. Design advances of the Core Plasma Thomson Scattering diagnostic for ITER

    NASA Astrophysics Data System (ADS)

    Scannell, R.; Maslov, M.; Naylor, G.; O'Gorman, T.; Kempenaars, M.; Carr, M.; Bilkova, P.; Bohm, P.; Giudicotti, L.; Pasqualotto, R.; Bassan, M.; Vayakis, G.; Walsh, M.; Huxford, R.

    2017-11-01

    The Core Plasma Thomson Scattering (CPTS) diagnostic on ITER performs measurements of the electron temperature and density profiles which are critical to the understanding of the ITER plasma. The diagnostic must satisfy the ITER project requirements, which translate to requirements on performance as well as reliability, safety and engineering. The implications are particularly challenging for beam dump lifetime, the need for continuous active alignment of the diagnostic during operation, allowable neutron flux in the interspace and the protection of the first mirror from plasma deposition. The CPTS design has been evolving over a number of years. One recent improvement is that the collection optics have been modified to include freeform surfaces. These freeform surfaces introduce extra complexity to the manufacturing but provide greater flexibility in the design. The greater flexibility introduced allows for example to lower neutron throughput or use fewer surfaces while improving optical performance. Performance assessment has shown that scattering from a 1064 nm laser will be sufficient to meet the measurement requirements, at least for the system at the start of operations. Optical transmission at λ < 600 nm is expected to degrade over the ITER lifetime due to fibre darkening and deposition on the first mirror. For this reason, it is proposed that the diagnostic should additionally include measurements of TS 'depolarised light' and a 1319 nm laser system. These additional techniques have different spectral and polarisation dependencies compared to scattering from a 1064 nm laser and hence provide greater robustness into the inferred measurements of Te and ne in the core.

  7. Blade design and analysis using a modified Euler solver

    NASA Technical Reports Server (NTRS)

    Leonard, O.; Vandenbraembussche, R. A.

    1991-01-01

    An iterative method for blade design based on Euler solver and described in an earlier paper is used to design compressor and turbine blades providing shock free transonic flows. The method shows a rapid convergence, and indicates how much the flow is sensitive to small modifications of the blade geometry, that the classical iterative use of analysis methods might not be able to define. The relationship between the required Mach number distribution and the resulting geometry is discussed. Examples show how geometrical constraints imposed upon the blade shape can be respected by using free geometrical parameters or by relaxing the required Mach number distribution. The same code is used both for the design of the required geometry and for the off-design calculations. Examples illustrate the difficulty of designing blade shapes with optimal performance also outside of the design point.

  8. The International Design Study for the Neutrino Factory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Long, K.

    2008-02-21

    The International Design Study for a future Neutrino Factory and super-beam facility (the ISS) established the physics case for a high-precision programme of long-baseline neutrino-oscillation measurements. The ISS also identified baseline specifications for the Neutrino Factory accelerator complex and the neutrino detector systems. This paper summarises the objectives of the International Design Study for the Neutrino Factory (the IDS-NF). The IDS-NF will build on the work of the ISS to deliver a Reference Design Report for the Neutrino Factory by 2012/13 and an Interim Design Report by 2010/11.

  9. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...

  10. Design Features of the Neutral Particle Diagnostic System for the ITER Tokamak

    NASA Astrophysics Data System (ADS)

    Petrov, S. Ya.; Afanasyev, V. I.; Melnik, A. D.; Mironov, M. I.; Navolotsky, A. S.; Nesenevich, V. G.; Petrov, M. P.; Chernyshev, F. V.; Kedrov, I. V.; Kuzmin, E. G.; Lyublin, B. V.; Kozlovski, S. S.; Mokeev, A. N.

    2017-12-01

    The control of the deuterium-tritium (DT) fuel isotopic ratio has to ensure the best performance of the ITER thermonuclear fusion reactor. The diagnostic system described in this paper allows the measurement of this ratio analyzing the hydrogen isotope fluxes (performing neutral particle analysis (NPA)). The development and supply of the NPA diagnostics for ITER was delegated to the Russian Federation. The diagnostics is being developed at the Ioffe Institute. The system consists of two analyzers, viz., LENPA (Low Energy Neutral Particle Analyzer) with 10-200 keV energy range and HENPA (High Energy Neutral Particle Analyzer) with 0.1-4.0MeV energy range. Simultaneous operation of both analyzers in different energy ranges enables researchers to measure the DT fuel ratio both in the central burning plasma (thermonuclear burn zone) and at the edge as well. When developing the diagnostic complex, it was necessary to account for the impact of several factors: high levels of neutron and gamma radiation, the direct vacuum connection to the ITER vessel, implying high tritium containment, strict requirements on reliability of all units and mechanisms, and the limited space available for accommodation of the diagnostic hardware at the ITER tokamak. The paper describes the design of the diagnostic complex and the engineering solutions that make it possible to conduct measurements under tokamak reactor conditions. The proposed engineering solutions provide a safe—with respect to thermal and mechanical loads—common vacuum channel for hydrogen isotope atoms to pass to the analyzers; ensure efficient shielding of the analyzers from the ITER stray magnetic field (up to 1 kG); provide the remote control of the NPA diagnostic complex, in particular, connection/disconnection of the NPA vacuum beamline from the ITER vessel; meet the ITER radiation safety requirements; and ensure measurements of the fuel isotopic ratio under high levels of neutron and gamma radiation.

  11. Digital approach to planning computer-guided surgery and immediate provisionalization in a partially edentulous patient.

    PubMed

    Arunyanak, Sirikarn P; Harris, Bryan T; Grant, Gerald T; Morton, Dean; Lin, Wei-Shao

    2016-07-01

    This report describes a digital approach for computer-guided surgery and immediate provisionalization in a partially edentulous patient. With diagnostic data obtained from cone-beam computed tomography and intraoral digital diagnostic scans, a digital pathway of virtual diagnostic waxing, a virtual prosthetically driven surgical plan, a computer-aided design and computer-aided manufacturing (CAD/CAM) surgical template, and implant-supported screw-retained interim restorations were realized with various open-architecture CAD/CAM systems. The optional CAD/CAM diagnostic casts with planned implant placement were also additively manufactured to facilitate preoperative inspection of the surgical template and customization of the CAD/CAM-fabricated interim restorations. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  12. Effects of Solar Array Shadowing on the Power Capability of the Interim Control Module

    NASA Technical Reports Server (NTRS)

    Fincannon, James; Hojnicki, Jeffrey S.; Garner, James Christopher

    1999-01-01

    The Interim Control Module (ICM) is being built by the US Naval Research Laboratory (NRL) for NASA as a propulsion module for the International Space Station (ISS). Originally developed as a spinning spacecraft used to move payloads to their final orbit, for ISS, the ICM will be in a fixed orientation and location for long periods resulting in substantial solar panel shadowing. This paper describes the methods used to determine the incident energy incident energy on the ICM solar panels and the power capability of the electric power system (EPS). Applying this methodology has resulted in analyses and assessments used to identify ICM early design changes/options, placement and orientations that enable successful operation of the EPS under a wide variety of anticipated conditions.

  13. Adaptive iterative learning control of a class of nonlinear time-delay systems with unknown backlash-like hysteresis input and control direction.

    PubMed

    Wei, Jianming; Zhang, Youan; Sun, Meimei; Geng, Baoliang

    2017-09-01

    This paper presents an adaptive iterative learning control scheme for a class of nonlinear systems with unknown time-varying delays and control direction preceded by unknown nonlinear backlash-like hysteresis. Boundary layer function is introduced to construct an auxiliary error variable, which relaxes the identical initial condition assumption of iterative learning control. For the controller design, integral Lyapunov function candidate is used, which avoids the possible singularity problem by introducing hyperbolic tangent funciton. After compensating for uncertainties with time-varying delays by combining appropriate Lyapunov-Krasovskii function with Young's inequality, an adaptive iterative learning control scheme is designed through neural approximation technique and Nussbaum function method. On the basis of the hyperbolic tangent function's characteristics, the system output is proved to converge to a small neighborhood of the desired trajectory by constructing Lyapunov-like composite energy function (CEF) in two cases, while keeping all the closed-loop signals bounded. Finally, a simulation example is presented to verify the effectiveness of the proposed approach. Copyright © 2017 ISA. Published by Elsevier Ltd. All rights reserved.

  14. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TORRES, T.D.

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will bemore » exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the manufacturer's stated shelf life. In order to determine the transfer line service life this evaluation examines the certification of shelf life, the certification of chemical compatibility with waste, catalog information of ambient ratings and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials. During initial hose procurements, the hose-in-hose transfer line vendor River Bend Hose Specialty (RBHS) submitted a letter, dated 6/8/00, which recommended the service and shelf life of the hose to be seven years. In submittals for later hose procurements, RBHS submitted a letter, dated 11/6/00, which recommended the service life of the hose to be three years. This submittal was followed by documentation, on 2/14/01, which submitted new storage requirements and restated the seven year shelf life. RBHS revised their original hose service life estimate to a more conservative three years due to concerns over the effects of chemicals in transferred waste. The above mentioned submittals from RBHS are the primary drivers of the three year service life limit established by this document.« less

  15. Evaluation of the cryogenic mechanical properties of the insulation material for ITER Feeder superconducting joint

    NASA Astrophysics Data System (ADS)

    Wu, Zhixiong; Huang, Rongjin; Huang, ChuanJun; Yang, Yanfang; Huang, Xiongyi; Li, Laifeng

    2017-12-01

    The Glass-fiber reinforced plastic (GFRP) fabricated by the vacuum bag process was selected as the high voltage electrical insulation and mechanical support for the superconducting joints and the current leads for the ITER Feeder system. To evaluate the cryogenic mechanical properties of the GFRP, the mechanical properties such as the short beam strength (SBS), the tensile strength and the fatigue fracture strength after 30,000 cycles, were measured at 77K in this study. The results demonstrated that the GFRP met the design requirements of ITER.

  16. Characterization of the ITER model negative ion source during long pulse operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hemsworth, R.S.; Boilson, D.; Crowley, B.

    2006-03-15

    It is foreseen to operate the neutral beam system of the International Thermonuclear Experimental Reactor (ITER) for pulse lengths extending up to 1 h. The performance of the KAMABOKO III negative ion source, which is a model of the source designed for ITER, is being studied on the MANTIS test bed at Cadarache. This article reports the latest results from the characterization of the ion source, in particular electron energy distribution measurements and the comparison between positive ion and negative ion extraction from the source.

  17. Equivalent charge source model based iterative maximum neighbor weight for sparse EEG source localization.

    PubMed

    Xu, Peng; Tian, Yin; Lei, Xu; Hu, Xiao; Yao, Dezhong

    2008-12-01

    How to localize the neural electric activities within brain effectively and precisely from the scalp electroencephalogram (EEG) recordings is a critical issue for current study in clinical neurology and cognitive neuroscience. In this paper, based on the charge source model and the iterative re-weighted strategy, proposed is a new maximum neighbor weight based iterative sparse source imaging method, termed as CMOSS (Charge source model based Maximum neighbOr weight Sparse Solution). Different from the weight used in focal underdetermined system solver (FOCUSS) where the weight for each point in the discrete solution space is independently updated in iterations, the new designed weight for each point in each iteration is determined by the source solution of the last iteration at both the point and its neighbors. Using such a new weight, the next iteration may have a bigger chance to rectify the local source location bias existed in the previous iteration solution. The simulation studies with comparison to FOCUSS and LORETA for various source configurations were conducted on a realistic 3-shell head model, and the results confirmed the validation of CMOSS for sparse EEG source localization. Finally, CMOSS was applied to localize sources elicited in a visual stimuli experiment, and the result was consistent with those source areas involved in visual processing reported in previous studies.

  18. Design of robust iterative learning control schemes for systems with polytopic uncertainties and sector-bounded nonlinearities

    NASA Astrophysics Data System (ADS)

    Boski, Marcin; Paszke, Wojciech

    2017-01-01

    This paper deals with designing of iterative learning control schemes for uncertain systems with static nonlinearities. More specifically, the nonlinear part is supposed to be sector bounded and system matrices are assumed to range in the polytope of matrices. For systems with such nonlinearities and uncertainties the repetitive process setting is exploited to develop a linear matrix inequality based conditions for computing the feedback and feedforward (learning) controllers. These controllers guarantee acceptable dynamics along the trials and ensure convergence of the trial-to-trial error dynamics, respectively. Numerical examples illustrate the theoretical results and confirm effectiveness of the designed control scheme.

  19. An Approach to the Constrained Design of Natural Laminar Flow Airfoils

    NASA Technical Reports Server (NTRS)

    Green, Bradford E.

    1997-01-01

    A design method has been developed by which an airfoil with a substantial amount of natural laminar flow can be designed, while maintaining other aerodynamic and geometric constraints. After obtaining the initial airfoil's pressure distribution at the design lift coefficient using an Euler solver coupled with an integral turbulent boundary layer method, the calculations from a laminar boundary layer solver are used by a stability analysis code to obtain estimates of the transition location (using N-Factors) for the starting airfoil. A new design method then calculates a target pressure distribution that will increase the laminar flow toward the desired amount. An airfoil design method is then iteratively used to design an airfoil that possesses that target pressure distribution. The new airfoil's boundary layer stability characteristics are determined, and this iterative process continues until an airfoil is designed that meets the laminar flow requirement and as many of the other constraints as possible.

  20. An approach to the constrained design of natural laminar flow airfoils

    NASA Technical Reports Server (NTRS)

    Green, Bradford Earl

    1995-01-01

    A design method has been developed by which an airfoil with a substantial amount of natural laminar flow can be designed, while maintaining other aerodynamic and geometric constraints. After obtaining the initial airfoil's pressure distribution at the design lift coefficient using an Euler solver coupled with an integml turbulent boundary layer method, the calculations from a laminar boundary layer solver are used by a stability analysis code to obtain estimates of the transition location (using N-Factors) for the starting airfoil. A new design method then calculates a target pressure distribution that will increase the larninar flow toward the desired amounl An airfoil design method is then iteratively used to design an airfoil that possesses that target pressure distribution. The new airfoil's boundary layer stability characteristics are determined, and this iterative process continues until an airfoil is designed that meets the laminar flow requirement and as many of the other constraints as possible.

  1. Design of a Single Motor Based Leg Structure with the Consideration of Inherent Mechanical Stability

    NASA Astrophysics Data System (ADS)

    Taha Manzoor, Muhammad; Sohail, Umer; Noor-e-Mustafa; Nizami, Muhammad Hamza Asif; Ayaz, Yasar

    2017-07-01

    The fundamental aspect of designing a legged robot is constructing a leg design that is robust and presents a simple control problem. In this paper, we have successfully designed a robotic leg based on a unique four bar mechanism with only one motor per leg. The leg design parameters used in our platform are extracted from design principles used in biological systems, multiple iterations and previous research findings. These principles guide a robotic leg to have minimal mechanical passive impedance, low leg mass and inertia, a suitable foot trajectory utilizing a practical balance between leg kinematics and robot usage, and the resultant inherent mechanical stability. The designed platform also exhibits the key feature of self-locking. Theoretical tools and software iterations were used to derive these practical features and yield an intuitive sense of the required leg design parameters.

  2. Development of two-channel prototype ITER vacuum ultraviolet spectrometer with back-illuminated charge-coupled device and microchannel plate detectors.

    PubMed

    Seon, C R; Choi, S H; Cheon, M S; Pak, S; Lee, H G; Biel, W; Barnsley, R

    2010-10-01

    A vacuum ultraviolet (VUV) spectrometer of a five-channel spectral system is designed for ITER main plasma impurity measurement. To develop and verify the system design, a two-channel prototype system is fabricated with No. 3 (14.4-31.8 nm) and No. 4 (29.0-60.0 nm) among the five channels. The optical system consists of a collimating mirror to collect the light from source to slit, two holographic diffraction gratings with toroidal geometry, and two different electronic detectors. For the test of the prototype system, a hollow cathode lamp is used as a light source. To find the appropriate detector for ITER VUV system, two kinds of detectors of the back-illuminated charge-coupled device and the microchannel plate electron multiplier are tested, and their performance has been investigated.

  3. Conceptual design of the ITER fast-ion loss detector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garcia-Munoz, M., E-mail: mgm@us.es; Ayllon-Guerola, J.; Galdon, J.

    2016-11-15

    A conceptual design of a reciprocating fast-ion loss detector for ITER has been developed and is presented here. Fast-ion orbit simulations in a 3D magnetic equilibrium and up-to-date first wall have been carried out to revise the measurement requirements for the lost alpha monitor in ITER. In agreement with recent observations, the simulations presented here suggest that a pitch-angle resolution of ∼5° might be necessary to identify the loss mechanisms. Synthetic measurements including realistic lost alpha-particle as well as neutron and gamma fluxes predict scintillator signal-to-noise levels measurable with standard light acquisition systems with the detector aperture at ∼11 cmmore » outside of the diagnostic first wall. At measurement position, heat load on detector head is comparable to that in present devices.« less

  4. Applicability of Kerker preconditioning scheme to the self-consistent density functional theory calculations of inhomogeneous systems

    NASA Astrophysics Data System (ADS)

    Zhou, Yuzhi; Wang, Han; Liu, Yu; Gao, Xingyu; Song, Haifeng

    2018-03-01

    The Kerker preconditioner, based on the dielectric function of homogeneous electron gas, is designed to accelerate the self-consistent field (SCF) iteration in the density functional theory calculations. However, a question still remains regarding its applicability to the inhomogeneous systems. We develop a modified Kerker preconditioning scheme which captures the long-range screening behavior of inhomogeneous systems and thus improves the SCF convergence. The effectiveness and efficiency is shown by the tests on long-z slabs of metals, insulators, and metal-insulator contacts. For situations without a priori knowledge of the system, we design the a posteriori indicator to monitor if the preconditioner has suppressed charge sloshing during the iterations. Based on the a posteriori indicator, we demonstrate two schemes of the self-adaptive configuration for the SCF iteration.

  5. Formulation for Simultaneous Aerodynamic Analysis and Design Optimization

    NASA Technical Reports Server (NTRS)

    Hou, G. W.; Taylor, A. C., III; Mani, S. V.; Newman, P. A.

    1993-01-01

    An efficient approach for simultaneous aerodynamic analysis and design optimization is presented. This approach does not require the performance of many flow analyses at each design optimization step, which can be an expensive procedure. Thus, this approach brings us one step closer to meeting the challenge of incorporating computational fluid dynamic codes into gradient-based optimization techniques for aerodynamic design. An adjoint-variable method is introduced to nullify the effect of the increased number of design variables in the problem formulation. The method has been successfully tested on one-dimensional nozzle flow problems, including a sample problem with a normal shock. Implementations of the above algorithm are also presented that incorporate Newton iterations to secure a high-quality flow solution at the end of the design process. Implementations with iterative flow solvers are possible and will be required for large, multidimensional flow problems.

  6. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    PubMed

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  7. Computational methods of robust controller design for aerodynamic flutter suppression

    NASA Technical Reports Server (NTRS)

    Anderson, L. R.

    1981-01-01

    The development of Riccati iteration, a tool for the design and analysis of linear control systems is examined. First, Riccati iteration is applied to the problem of pole placement and order reduction in two-time scale control systems. Order reduction, yielding a good approximation to the original system, is demonstrated using a 16th order linear model of a turbofan engine. Next, a numerical method for solving the Riccati equation is presented and demonstrated for a set of eighth order random examples. A literature review of robust controller design methods follows which includes a number of methods for reducing the trajectory and performance index sensitivity in linear regulators. Lastly, robust controller design for large parameter variations is discussed.

  8. 37 CFR 202.2 - Copyright notice.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... may be on a container which is designed and can be expected to remain with the work; (11) The notice...) General. (1) With respect to a work published before January 1, 1978, copyright was secured, or the right to secure it was lost, except for works seeking ad interim copyright, at the date of publication, i.e...

  9. Science: Grade 7. Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg.

    This guide is one of a set of 10 science guides, each covering a separate grade in Manitoba, together covering kindergarten through grade 9. The guides have been designed to provide a framework for building scientific concepts and developing the learning of process skills. They replace an earlier set of guides dated 1979. Each guide is essentially…

  10. 9 CFR 92.4 - Reestablishment of a region's disease-free status.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Reestablishment of a region's disease... Requesting Recognition of Regions Other Than for BSE § 92.4 Reestablishment of a region's disease-free status... disease and then experience an outbreak of that disease. (a) Interim designation. If a region recognized...

  11. Science: Grade 6. Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg.

    This guide is one of a set of 10 science guides, each covering a separate grade in Manitoba, together covering kindergarten through grade 9. The guides have been designed to provide a framework for building scientific concepts and developing the learning of process skills. They replace an earlier set of guides dated 1979. Each guide is essentially…

  12. Working Parents Project (WPP). Final Interim Report.

    ERIC Educational Resources Information Center

    Mason, Theresa; Espinoza, Renato

    Results are reported from a 2-year study designed to explore how the nature of women's jobs, as viewed by women and their husbands, influences the system of nuclear family relationships and affects parents' involvement with their children's schools. The research has evolved into a comparative exploratory study of the responses of 30 families to…

  13. Upward Bound Math-Science: Program Description and Interim Impact Estimates

    ERIC Educational Resources Information Center

    Olsen, Robert; Seftor, Neil; Silva, Tim; Myers, David; DesRoches, David; Young, Julie

    2007-01-01

    To help address continuing disparities in academic achievement and under-representation of disadvantaged groups in math and science majors and careers, the U.S. Department of Education (ED) established a math and science initiative in 1990 within Upward Bound, a federal grant program known as Upward Bound Math-Science (UBMS) designed to provide…

  14. 45 CFR 86.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Equipment, 86.41(c) Expenditures, 86.41(c) Facilities, 86.41(c) Travel, 86.41(c) Scholarships, [64, 65]; 86...-time employees, [89] G Grievance Procedure, see “Designation of responsible employee”, 86.8(a) (b) H... Undergraduate Professional Schools, [30]; 86.15(d) Purpose of Regulation, [13]; 86.1 R Real Property, 86.2(g...

  15. ATMS concept of operations and generic system requirements : task B : final interim report for design of support systems for advanced traffic management systems

    DOT National Transportation Integrated Search

    1993-10-01

    This document describes the Concept of Operations and Generic System Requirements for : the next generation of Traffic Management Centers (TMC). Four major steps comprise the : development of this Concept of Operations. The first step was to survey t...

  16. An Investigation of Energy Consumption and Cost in Large Air-Conditioned Buildings. An Interim Report.

    ERIC Educational Resources Information Center

    Milbank, N. O.

    Two similarly large buildings and air conditioning systems are comparatively analyzed as to energy consumption, costs, and inefficiency during certain measured periods of time. Building design and velocity systems are compared to heating, cooling, lighting and distribution capabilities. Energy requirements for pumps, fans and lighting are found to…

  17. Implementation of the Career Education Incentive Act. First Interim Report on the Evaluability Assessment.

    ERIC Educational Resources Information Center

    Jung, Steven M.; And Others

    Survey activities are reported which were designed to provide the foundation for a national evaluation of the effectiveness of programs assisted under the Career Education Incentive Act of 1977 (PL 95-207). The methodology described, called "program evaluability assessment," focuses on detailed analysis of program assumptions in order to…

  18. Integrating Quality Assurance Systems in a Merged Higher Education Institution

    ERIC Educational Resources Information Center

    Kistan, Chandru

    2005-01-01

    Purpose: This article seeks to highlight the challenges and issues that face merging higher education institutions and also to outline some of the challenges in integrating the quality assurance systems during the pre-, interim and post-merger phases in a merged university. Design/methodology/approach: Case studies of merged and merging…

  19. Progress Report 2013. Turnaround Arts Initiative

    ERIC Educational Resources Information Center

    Stoelinga, Sara Ray; Joyce, Katie; Silk, Yael

    2013-01-01

    This interim progress report provides a look at Turnaround Arts schools in their first year, including: (1) a summary of the evaluation design and research questions; (2) a preliminary description of strategies used to introduce the arts in Turnaround Arts schools; and (3) a summary of school reform indicators and student achievement data at…

  20. Science: Grade 8. Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg.

    This guide is one of a set of 10 science guides, each covering a separate grade in Manitoba, together covering kindergarten through grade 9. The guides have been designed to provide a framework for building scientific concepts and developing the learning of process skills. They replace an earlier set of guides dated 1979. Each guide is essentially…

  1. 32 CFR 733.3 - Information and policy on support of dependents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... so would lend excessive credence to administrative tools which have been designed for use only within... armed forces). Interim support for each family member shall be either $200.00 per supported family... of 1/3 gross pay, per month. (4) Both spouses in the armed forces. (i) No children of the marriage...

  2. Science: Grade 2. Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg.

    This guide is one of a set of 10 science guides, each covering a separate grade in Manitoba, together covering kindergarten through grade 9. The guides have been designed to provide a framework for building scientific concepts and developing the learning of process skills. They replace an earlier set of guides dated 1979. Each guide is essentially…

  3. Science: Grade 1. Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg.

    This guide is one of a set of 10 science guides, each covering a separate grade in Manitoba, together covering kindergarten through grade 9. The guides have been designed to provide a framework for building scientific concepts and developing the learning of process skills. They replace an earlier set of guides dated 1979. Each guide is essentially…

  4. Science: Kindergarten. Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg.

    This guide is one of a set of 10 science guides, each covering a separate grade in Manitoba, together covering kindergarten through grade 9. The guides have been designed to provide a framework for building scientific concepts and developing the learning of process skills. They replace an earlier set of guides dated 1979. Each guide is essentially…

  5. An evaluation of the following too closely monitor system on a four-lane undivided highway : interim report.

    DOT National Transportation Integrated Search

    1976-01-01

    The FOLLOWING TOO CLOSELY (FTC) MONITOR system is an experimental device designed to measure vehicle gaps at a point along the highway and to advise the motorist, by means of a flashing message on a sign, that he is following the car in front of him ...

  6. Science 26: Teacher Resource Manual. Integrated Occupational Program. Interim 1991.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Curriculum Branch.

    The Integrated Occupation Science 26 Program is an optional program designed to allow students in Alberta, Canada to meet the credit requirements of the Certificate of Achievement and facilitate transfer to the General High School Diploma Program. This Teacher Resource Manual is provided to assist classroom teachers to implement the Science 26…

  7. Analog Design for Digital Deployment of a Serious Leadership Game

    NASA Technical Reports Server (NTRS)

    Maxwell, Nicholas; Lang, Tristan; Herman, Jeffrey L.; Phares, Richard

    2012-01-01

    This paper presents the design, development, and user testing of a leadership development simulation. The authors share lessons learned from using a design process for a board game to allow for quick and inexpensive revision cycles during the development of a serious leadership development game. The goal of this leadership simulation is to accelerate the development of leadership capacity in high-potential mid-level managers (GS-15 level) in a federal government agency. Simulation design included a mixed-method needs analysis, using both quantitative and qualitative approaches to determine organizational leadership needs. Eight design iterations were conducted, including three user testing phases. Three re-design iterations followed initial development, enabling game testing as part of comprehensive instructional events. Subsequent design, development and testing processes targeted digital application to a computer- and tablet-based environment. Recommendations include pros and cons of development and learner testing of an initial analog simulation prior to full digital simulation development.

  8. The IRIS-GUS Shuttle Borne Upper Stage System

    NASA Technical Reports Server (NTRS)

    Tooley, Craig; Houghton, Martin; Bussolino, Luigi; Connors, Paul; Broudeur, Steve (Technical Monitor)

    2002-01-01

    This paper describes the Italian Research Interim Stage - Gyroscopic Upper Stage (IRIS-GUS) upper stage system that will be used to launch NASA's Triana Observatory from the Space Shuttle. Triana is a pathfinder earth science mission being executed on rapid schedule and small budget, therefore the mission's upper stage solution had to be a system that could be fielded quickly at relatively low cost and risk. The building of the IRIS-GUS system wa necessary because NASA lost the capability to launch moderately sized upper stage missions fro the Space Shuttle when the PAM-D system was retired. The IRIS-GUS system restores this capability. The resulting system is a hybrid which mates the existing, flight proven IRIS (Italian Research Interim Stage) airborne support equipment to a new upper stage, the Gyroscopic Upper Stage (GUS) built by the GSFC for Triana. Although a new system, the GUS exploits flight proven hardware and design approaches in most subsystems, in some cases implementing proven design approaches with state-of-the-art electronics. This paper describes the IRIS-GUS upper stage system elements, performance capabilities, and payload interfaces.

  9. Incorporating Prototyping and Iteration into Intervention Development: A Case Study of a Dining Hall-Based Intervention

    ERIC Educational Resources Information Center

    McClain, Arianna D.; Hekler, Eric B.; Gardner, Christopher D.

    2013-01-01

    Background: Previous research from the fields of computer science and engineering highlight the importance of an iterative design process (IDP) to create more creative and effective solutions. Objective: This study describes IDP as a new method for developing health behavior interventions and evaluates the effectiveness of a dining hall--based…

  10. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma: interpretation criteria and concordance rate among reviewers.

    PubMed

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F

    2013-05-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.

  11. Publishing interim results of randomised clinical trials in peer-reviewed journals.

    PubMed

    Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan

    2017-02-01

    Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.

  12. Design, Manufacture, and Experimental Serviceability Validation of ITER Blanket Components

    NASA Astrophysics Data System (ADS)

    Leshukov, A. Yu.; Strebkov, Yu. S.; Sviridenko, M. N.; Safronov, V. M.; Putrik, A. B.

    2017-12-01

    In 2014, the Russian Federation and the ITER International Organization signed two Procurement Arrangements (PAs) for ITER blanket components: 1.6.P1ARF.01 "Blanket First Wall" of February 14, 2014, and 1.6.P3.RF.01 "Blanket Module Connections" of December 19, 2014. The first PA stipulates development, manufacture, testing, and delivery to the ITER site of 179 Enhanced Heat Flux (EHF) First Wall (FW) Panels intended for withstanding the heat flux from the plasma up to 4.7MW/m2. Two Russian institutions, NIIEFA (Efremov Institute) and NIKIET, are responsible for the implementation of this PA. NIIEFA manufactures plasma-facing components (PFCs) of the EHF FW panels and performs the final assembly and testing of the panels, and NIKIET manufactures FW beam structures, load-bearing structures of PFCs, and all elements of the panel attachment system. As for the second PA, NIKIET is the sole official supplier of flexible blanket supports, electrical insulation key pads (EIKPs), and blanket module/vacuum vessel electrical connectors. Joint activities of NIKIET and NIIEFA for implementing PA 1.6.P1ARF.01 are briefly described, and information on implementation of PA 1.6.P3.RF.01 is given. Results of the engineering design and research efforts in the scope of the above PAs in 2015-2016 are reported, and results of developing the technology for manufacturing ITER blanket components are presented.

  13. RAMI Analysis for Designing and Optimizing Tokamak Cooling Water System (TCWS) for the ITER's Fusion Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferrada, Juan J; Reiersen, Wayne T

    U.S.-ITER is responsible for the design, engineering, and procurement of the Tokamak Cooling Water System (TCWS). TCWS is designed to provide cooling and baking for client systems that include the first wall/blanket, vacuum vessel, divertor, and neutral beam injector. Additional operations that support these primary functions include chemical control of water provided to client systems, draining and drying for maintenance, and leak detection/localization. TCWS interfaces with 27 systems including the secondary cooling system, which rejects this heat to the environment. TCWS transfers heat generated in the Tokamak during nominal pulsed operation - 850 MW at up to 150 C andmore » 4.2 MPa water pressure. Impurities are diffused from in-vessel components and the vacuum vessel by water baking at 200-240 C at up to 4.4 MPa. TCWS is complex because it serves vital functions for four primary clients whose performance is critical to ITER's success and interfaces with more than 20 additional ITER systems. Conceptual design of this one-of-a-kind cooling system has been completed; however, several issues remain that must be resolved before moving to the next stage of the design process. The 2004 baseline design indicated cooling loops that have no fault tolerance for component failures. During plasma operation, each cooling loop relies on a single pump, a single pressurizer, and one heat exchanger. Consequently, failure of any of these would render TCWS inoperable, resulting in plasma shutdown. The application of reliability, availability, maintainability, and inspectability (RAMI) tools during the different stages of TCWS design is crucial for optimization purposes and for maintaining compliance with project requirements. RAMI analysis will indicate appropriate equipment redundancy that provides graceful degradation in the event of an equipment failure. This analysis helps demonstrate that using proven, commercially available equipment is better than using custom-designed equipment with no field experience and lowers specific costs while providing higher reliability. This paper presents a brief description of the TCWS conceptual design and the application of RAMI tools to optimize the design at different stages during the project.« less

  14. Design Performance of Front Steering-Type Electron Cyclotron Launcher for ITER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Takahashi, K.; Imai, T.; Kobayashi, N.

    2005-01-15

    The performance of a front steering (FS)-type electron cyclotron launcher designed for the International Thermonuclear Experimental Reactor (ITER) is evaluated with a thermal, electromagnetic, and nuclear analysis of the components; a mechanical test of a spiral tube for the steering mirror; and a rotational test of bearings. The launcher consists of a front shield and a launcher plug where three movable optic mirrors to steer incident multimegawatt radio-frequency beam power, waveguide components, nuclear shields, and vacuum windows are installed. The windows are located behind a closure plate to isolate the transmission lines from the radioactivated circumstance (vacuum vessel). The waveguidemore » lines of the launcher are doglegged to reduce the direct neutron streaming toward the vacuum windows and other components. The maximum stresses on the critical components such as the steering mirror, its cooling tube, and the front shield are less than their allowable stresses. It was also identified that the stress on the launcher, which yielded from electromagnetic force caused by plasma disruption, was a little larger than the criteria, and a modification of the launcher plug structure was necessary. The nuclear analysis result shows that the neutron shield capability of the launcher satisfies the shield criteria of the ITER. It concludes that the design of the FS launcher is generally suitable for application to the ITER.« less

  15. Methodology for Sensitivity Analysis, Approximate Analysis, and Design Optimization in CFD for Multidisciplinary Applications

    NASA Technical Reports Server (NTRS)

    Taylor, Arthur C., III; Hou, Gene W.

    1996-01-01

    An incremental iterative formulation together with the well-known spatially split approximate-factorization algorithm, is presented for solving the large, sparse systems of linear equations that are associated with aerodynamic sensitivity analysis. This formulation is also known as the 'delta' or 'correction' form. For the smaller two dimensional problems, a direct method can be applied to solve these linear equations in either the standard or the incremental form, in which case the two are equivalent. However, iterative methods are needed for larger two-dimensional and three dimensional applications because direct methods require more computer memory than is currently available. Iterative methods for solving these equations in the standard form are generally unsatisfactory due to an ill-conditioned coefficient matrix; this problem is overcome when these equations are cast in the incremental form. The methodology is successfully implemented and tested using an upwind cell-centered finite-volume formulation applied in two dimensions to the thin-layer Navier-Stokes equations for external flow over an airfoil. In three dimensions this methodology is demonstrated with a marching-solution algorithm for the Euler equations to calculate supersonic flow over the High-Speed Civil Transport configuration (HSCT 24E). The sensitivity derivatives obtained with the incremental iterative method from a marching Euler code are used in a design-improvement study of the HSCT configuration that involves thickness. camber, and planform design variables.

  16. WFIRST Project Science Activities

    NASA Technical Reports Server (NTRS)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  17. Preliminary design package for residential heating/cooling system: Rankine air conditioner redesign

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A summary of the preliminary redesign and development of a marketable single family heating and cooling system is presented. The interim design and schedule status of the residential (3-ton) redesign, problem areas and solutions, and the definition of plans for future design and development activities were discussed. The proposed system for a single-family residential heating and cooling system is a single-loop, solar-assisted, hydronic-to-warm-air heating subsystem with solar-assisted domestic water heating and a Rankine-driven expansion air-conditioning subsystem.

  18. The ITER ICRF Antenna Design with TOPICA

    NASA Astrophysics Data System (ADS)

    Milanesio, Daniele; Maggiora, Riccardo; Meneghini, Orso; Vecchi, Giuseppe

    2007-11-01

    TOPICA (Torino Polytechnic Ion Cyclotron Antenna) code is an innovative tool for the 3D/1D simulation of Ion Cyclotron Radio Frequency (ICRF), i.e. accounting for antennas in a realistic 3D geometry and with an accurate 1D plasma model [1]. The TOPICA code has been deeply parallelized and has been already proved to be a reliable tool for antennas design and performance prediction. A detailed analysis of the 24 straps ITER ICRF antenna geometry has been carried out, underlining the strong dependence and asymmetries of the antenna input parameters due to the ITER plasma response. We optimized the antenna array geometry dimensions to maximize loading, lower mutual couplings and mitigate sheath effects. The calculated antenna input impedance matrices are TOPICA results of a paramount importance for the tuning and matching system design. Electric field distributions have been also calculated and they are used as the main input for the power flux estimation tool. The designed optimized antenna is capable of coupling 20 MW of power to plasma in the 40 -- 55 MHz frequency range with a maximum voltage of 45 kV in the feeding coaxial cables. [1] V. Lancellotti et al., Nuclear Fusion, 46 (2006) S476-S499

  19. The child's perspective as a guiding principle: Young children as co-designers in the design of an interactive application meant to facilitate participation in healthcare situations.

    PubMed

    Stålberg, Anna; Sandberg, Anette; Söderbäck, Maja; Larsson, Thomas

    2016-06-01

    During the last decade, interactive technology has entered mainstream society. Its many users also include children, even the youngest ones, who use the technology in different situations for both fun and learning. When designing technology for children, it is crucial to involve children in the process in order to arrive at an age-appropriate end product. In this study we describe the specific iterative process by which an interactive application was developed. This application is intended to facilitate young children's, three-to five years old, participation in healthcare situations. We also describe the specific contributions of the children, who tested the prototypes in a preschool, a primary health care clinic and an outpatient unit at a hospital, during the development process. The iterative phases enabled the children to be involved at different stages of the process and to evaluate modifications and improvements made after each prior iteration. The children contributed their own perspectives (the child's perspective) on the usability, content and graphic design of the application, substantially improving the software and resulting in an age-appropriate product. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Different predictive values of interim 18F-FDG PET/CT in germinal center like and non-germinal center like diffuse large B-cell lymphoma.

    PubMed

    Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung

    2017-01-01

    Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.

Top