Sample records for jaderne elektrarny dukovany

  1. Solidification of spent ion exchange resins into the SIAL matrix at the Dukovany NPP, Czech Republic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tatransky, Peter; Prazska, Milena; Harvan, David

    2013-07-01

    Based on the decision of the State Office for Nuclear Safety, the Dukovany NPP has been obliged to secure the efficient capacities for the disposal of spent ion exchange resins. Therefore, in September 2010, based on the contract with supplier company AMEC Nuclear Slovakia s.r.o. has begun with pumping and treatment of ion exchange resins from the storage tank 0TW30B02, situated in the auxiliary building. The SIAL{sup R} technology, developed in AMEC Nuclear Slovakia, has been used for the solidification purposes. This technology allows an on-site treatment of various special radioactive waste streams (resins, sludge, sludge/resins and borates) at themore » room temperature. The SIAL{sup R} matrix and technology were licensed by the Czech State Office for Nuclear Safety in 2007. On-site treatment and solidification of spent ion exchange resins at Dukovany NPP involves process of resin removal from tank using remotely operated manipulator, resin transportation, resin separation from free water, resin filling into 200 dm{sup 3} drums and solidification into SIAL{sup R} matrix in 200 dm{sup 3} drums using the FIZA S 200 facility. The final product is observed for compressive strength, leachability, radionuclide composition, dose rate, solids and total weight. After meeting the requirements for final disposal and consolidation, the drums are being transported for the final disposal to the Repository at Dukovany site. During the 3 month's trial operation in 2010, and the normal operation in 2011 and 2012, 189 tons of dewatered resins have been treated into 1960 drums, with total activity higher than 920 GBq. At the end of trial run (2010), 22 tons of dewatered resins were treated into 235 drums. During standard operation approximately 91 tons in 960 drums (2011) and 76 tons in 765 drums (2012) were treated. The weights of resins in the drum ware in the range from 89 - 106 kg and compressive strength limit (10 MPa) has already been achieved 24 hours after fixation. The

  2. Direct Encapsulation of Spent Ion-exchange Resins at the Dukovany Nuclear Power Plant, Czech Republic - 12367

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fletcher, Paul; Rima, Steve

    2012-07-01

    At the Dukovany Nuclear Power Plant there are large amounts of spent ion exchange resins contained within storage tanks. These resins are a product of the operation of an Active Water Purification System within the Power Plant. Activity levels of the resins are in the range of 105 to 10{sup 6} Bq/l and the main isotopes present are Co-60, Cs-137, Mn-54 and Ag-110m. In order to maintain storage tank availability throughout the planned lifetime of the Power Plant these resins must be removed and disposed of safely. The storage tanks do not have an effective retrieval route for the resinsmore » and the installed agitation system is inoperable. A proven system for retrieving and directly encapsulating these resins to a standard required for the Czech repository is described, together with an overview of operational performance. Experience gained from this and other projects has highlighted some common challenges relating to the treatment of ion-exchange resins and sludges. There are common approaches that can assist in overcoming these challenges. 1. Transport resin / sludge type waste over as short a distance as possible to avoid issues with line plugging. 2. Transport these wastes once and once only wherever possible. 3. Try to keep the treatment process as simple as possible. With sludge or resin handling equipment consider the physical properties foremost - radiological issues can be addressed within any subsequent design. 4. Consider the use of dry-mix technologies. This avoids the requirement for expensive and complicated grouting plant. 5. Avoid the use of make up water for transport purposes if at all possible - it introduces secondary waste that needs to be treated at additional cost. 6. Consider alternative disposal techniques. SIAL{sup R} is AMEC's preferred technology as we developed it and understand it well - additionally the waste loading factors are much higher than for cement. 7. Consider final waste volumes when selecting the disposal technique

  3. Plant maintenance and plant life extension issue, 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agnihotri, Newal

    The focus of the March-April issue is on plant maintenance and plant life extension. Major articles/reports in this issue include: Spent fuel: myths and facts, by Jeffrey S. Merrifield, U.S. Nuclear Regulatory Commission; Critical pipe replacement procedure, by Geoff Gilmore, Climax Portable Machine Tools Inc.; Improving maintenance performance, by Larry Meyer and Joe Giuffre, DC Cook Nuclear Plant, American Electric Power; Equipment deficiency intolerance index, by Douglas F. Helms, Tennessee Valley Authority; Plant profile: I and C modernization at Dukovany, by Josef Rosol, CEZ Dukovany NPP, Czech Republic; and, Report: new plant activities.

  4. Determination of chemical forms of 14C in liquid discharges from nuclear power plants.

    PubMed

    Svetlik, I; Fejgl, M; Povinec, P P; Kořínková, T; Tomášková, L; Pospíchal, J; Kurfiřt, M; Striegler, R; Kaufmanová, M

    2017-10-01

    Developments of radioanalytical methods for determination of radiocarbon in wastewaters from nuclear power plants (NPP) with pressurized light water reactors, which would distinguish between the dissolved organic and inorganic forms have been carried out. After preliminary tests, the method was used to process pilot samples from wastewater outlets from the Temelín and Dukovany NPPs (Czech Republic). The results of analysis of pilot water samples collected in 2015 indicate that the instantaneous 14 C releases into the water streams would be about 7.10 -5 (Temelín) and 4.10 -6 (Dukovany) of the total quantity of the 14 C liberated into the environment. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. Three-dimensional pin-to-pin analyses of VVER-440 cores by the MOBY-DICK code

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lehmann, M.; Mikolas, P.

    1994-12-31

    Nuclear design for the Dukovany (EDU) VVER-440s nuclear power plant is routinely performed by the MOBY-DICK system. After its implementation on Hewlett Packard series 700 workstations, it is able to perform routinely three-dimensional pin-to-pin core analyses. For purposes of code validation, the benchmark prepared from EDU operational data was solved.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tendera, P.

    At present there are two NPPs equipped with PWR units in Czech Republic. The Dukovany NPP is about ten years in operation (four units 440 MW - WWER model 213) and Temelin NPP is under construction (two units 1000 MW-WWER model 320). Both NPPs were built to Soviet design and according to Soviet regulations and standards but most of equipment for primary circuits was supplied by home manufactures. The objective for the Czech LBB programme is to prove the LBB status of the primary piping systems of these NPPs and the LBB concept is a part of strategy to meetmore » western style safety standards. The reason for the Czech LBB project is a lack of some standard safety facilities, too. For both Dukovany and Temolin NPPs a full LBB analysis should be carried out. The application of LBB to the piping system should be also a cost effective means to avoid installations of pipe whip restraints and jet shields. The Czech regulatory body issued non-mandatory requirement {open_quotes}Leak Before Break{close_quotes} which is in compliance with national legal documents and which is based on the US NRC Regulatory Procedures and US standards (ASME, CODE, ANSI). The requirement has been published in the document {open_quotes}Safety of Nuclear Facilities{close_quotes} No. 1/1991 as {open_quotes}Requirements on the Content and Format of Safety Reports and their Supplements{close_quotes} and consists of two parts (1) procedure for obtaining proof of evidence {open_quotes}Leak Before Break{close_quotes} (2) leak detection systems for the pressurized reactor primary circuit. At present some changes concerning both parts of the above document will be introduced. The reasons for this modifications will be presented.« less

  7. Comparison of balance of tritium activity in waste water from nuclear power plants and at selected monitoring sites in the Vltava River, Elbe River and Jihlava (Dyje) River catchments in the Czech Republic.

    PubMed

    Hanslík, Eduard; Marešová, Diana; Juranová, Eva; Sedlářová, Barbora

    2017-12-01

    During the routine operation, nuclear power plants discharge waste water containing a certain amount of radioactivity, whose main component is the artificial radionuclide tritium. The amounts of tritium released into the environment are kept within the legal requirements, which minimize the noxious effects of radioactivity, but the activity concentration is well measurable in surface water of the recipient. This study compares amount of tritium activity in waste water from nuclear power plants and the tritium activity detected at selected relevant sites of surface water quality monitoring. The situation is assessed in the catchment of the Vltava and Elbe Rivers, affected by the Temelín Nuclear Power Plant as well as in the Jihlava River catchment (the Danube River catchment respectively), where the waste water of the Dukovany Nuclear Power Plant is discharged. The results show a good agreement of the amount of released tritium stated by the power plant operator and the tritium amount detected in the surface water and highlighted the importance of a robust independent monitoring of tritium discharged from a nuclear power plant which could be carried out by water management authorities. The outputs of independent monitoring allow validating the values reported by a polluter and expand opportunities of using tritium as e.g. tracer. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Predicting the impact of chromium on flow-accelerated corrosion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chexal, B.; Goyette, L.F.; Horowitz, J.S.

    1996-12-01

    Flow-Accelerated Corrosion (FAC) continues to cause problems in nuclear and fossil power plants. Many experiments have been performed to understand the mechanism of FAC. For approximately twenty years, it has ben widely recognized that the presence of small amounts of chromium will reduce the rate of FAC. This effect was quantified in the eighties by research performed in France, Germany and the Netherlands. The results of this research has been incorporated into the computer-based tools used by utility engineers to deal with this issue. For some time, plant data from Diablo Canyon has suggested that the existing correlations relating themore » concentration of chromium to the rate of FAC are conservative. Laboratory examinations have supported this observation. It appears that the existing correlations fail to capture a change in mechanism from a FAC process with linear kinetics to a general corrosion process with parabolic kinetics. This change in mechanism occurs at a chromium level of approximately 0.1%, within the allowable alloy range of typical carbon steel (ASTM/ASME A106 Grade B) used in power piping in most domestic plants. It has been difficult to obtain plant data that has sufficient chromium to develop a new correlation. Data from Diablo Canyon and the Dukovany Power Plant in the Czech Republic will be used to develop a new chromium correlation for predicting FAC rate.« less

  9. Reactor Dosimetry State of the Art 2008

    NASA Astrophysics Data System (ADS)

    Voorbraak, Wim; Debarberis, Luigi; D'Hondt, Pierre; Wagemans, Jan

    2009-08-01

    Oral session 1: Retrospective dosimetry. Retrospective dosimetry of VVER 440 reactor pressure vessel at the 3rd unit of Dukovany NPP / M. Marek ... [et al.]. Retrospective dosimetry study at the RPV of NPP Greifswald unit 1 / J. Konheiser ... [et al.]. Test of prototype detector for retrospective neutron dosimetry of reactor internals and vessel / K. Hayashi ... [et al.]. Neutron doses to the concrete vessel and tendons of a magnox reactor using retrospective dosimetry / D. A. Allen ... [et al.]. A retrospective dosimetry feasibility study for Atucha I / J. Wagemans ... [et al.]. Retrospective reactor dosimetry with zirconium alloy samples in a PWR / L. R. Greenwood and J. P. Foster -- Oral session 2: Experimental techniques. Characterizing the Time-dependent components of reactor n/y environments / P. J. Griffin, S. M. Luker and A. J. Suo-Anttila. Measurements of the recoil-ion response of silicon carbide detectors to fast neutrons / F. H. Ruddy, J. G. Seidel and F. Franceschini. Measurement of the neutron spectrum of the HB-4 cold source at the high flux isotope reactor at Oak Ridge National Laboratory / J. L. Robertson and E. B. Iverson. Feasibility of cavity ring-down laser spectroscopy for dose rate monitoring on nuclear reactor / H. Tomita ... [et al.]. Measuring transistor damage factors in a non-stable defect environment / D. B. King ... [et al.]. Neutron-detection based monitoring of void effects in boiling water reactors / J. Loberg ... [et al.] -- Poster session 1: Power reactor surveillance, retrospective dosimetry, benchmarks and inter-comparisons, adjustment methods, experimental techniques, transport calculations. Improved diagnostics for analysis of a reactor pulse radiation environment / S. M. Luker ... [et al.]. Simulation of the response of silicon carbide fast neutron detectors / F. Franceschini, F. H. Ruddy and B. Petrović. NSV A-3: a computer code for least-squares adjustment of neutron spectra and measured dosimeter responses / J. G