Sample records for jecfa 63rd meeting

  1. 76 FR 34209 - International Whaling Commission; 63rd Annual Meeting; Nominations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-13

    ... Commissioner representing the positions of non-governmental organizations. Generally, only one non-governmental... recommendations to the U.S. IWC Commissioner representing the positions of non-governmental organizations... International Whaling Commission; 63rd Annual Meeting; Nominations AGENCY: National Marine Fisheries Service...

  2. 73rd American Welding Society annual meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-01-01

    The volume includes the abstracts of papers presented at the 73rd American Welding Society Annual Meeting. Detailed summaries are given for 118 technical sessions papers discussing computer and control applications in welding, stainless steel, nickel and nickel alloys, weld metal microstructure, shipbuilding, consumables, structural welding, investigations in arc welding and cutting, arc welding processes, weldability testing, piping and tubing, high energy beam welding processes, welding metallurgy of structural steels, new applications, weld metal behavior, NDT certification, aluminum welding, submerged arc welding, modeling studies, resistance welding, friction welding, and safety and health. The 23rd International AWS Brazing and Soldering Conference wasmore » also held during this meeting. The topics presented in 24 papers included recent developments in soldering technology, brazing of stainless steel, brazing of ceramics and nickel material, filler metal developments for torch brazing, and developments in diffusion and induction brazing.« less

  3. 63. MISSISSIPPI, LOWNDES CO. COLUMBUS BLEWETT'S BRIDGE On Pickensville Rd., ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. MISSISSIPPI, LOWNDES CO. COLUMBUS BLEWETT'S BRIDGE On Pickensville Rd., S of Columbus 4.5 miles S on McLeod-Shuqualak road. Copy of snapshot in Lowndes Co. Public Library. Dated Aug 1926, when bridge was completed. View is lengthwise, through the truss. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  4. 76 FR 30921 - International Whaling Commission; 63rd Annual Meeting; Announcement of Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... with the responsibility of discharging the domestic obligations of the United States under the... of meetings. SUMMARY: This notice announces the dates, times, and locations of the public meetings... Department of State, the Department of the Interior, the Marine Mammal Commission, and by other agencies...

  5. EDITORIAL The 23rd Nordic Semiconductor Meeting The 23rd Nordic Semiconductor Meeting

    NASA Astrophysics Data System (ADS)

    Ólafsson, Sveinn; Sveinbjörnsson, Einar

    2010-12-01

    A Nordic Semiconductor Meeting is held every other year with the venue rotating amongst the Nordic countries of Denmark, Finland, Iceland, Norway and Sweden. The focus of these meetings remains 'original research and science being carried out on semiconductor materials, devices and systems'. Reports on industrial activity have usually featured. The topics have ranged from fundamental research on point defects in a semiconductor to system architecture of semiconductor electronic devices. Proceedings from these events are regularly published as a topical issue of Physica Scripta. All of the papers in this topical issue have undergone critical peer review and we wish to thank the reviewers and the authors for their cooperation, which has been instrumental in meeting the high scientific standards and quality of the series. This meeting of the 23rd Nordic Semiconductor community, NSM 2009, was held at Háskólatorg at the campus of the University of Iceland, Reykjavik, Iceland, 14-17 June 2009. Support was provided by the University of Iceland. Almost 50 participants presented a broad range of topics covering semiconductor materials and devices as well as related material science interests. The conference provided a forum for Nordic and international scientists to present and discuss new results and ideas concerning the fundamentals and applications of semiconductor materials. The meeting aim was to advance the progress of Nordic science and thus aid in future worldwide technological advances concerning technology, education, energy and the environment. Topics Theory and fundamental physics of semiconductors Emerging semiconductor technologies (for example III-V integration on Si, novel Si devices, graphene) Energy and semiconductors Optical phenomena and optical devices MEMS and sensors Program 14 June Registration 13:00-17:00 15 June Meeting program 09:30-17:00 and Poster Session I 16 June Meeting program 09:30-17:00 and Poster Session II 17 June Excursion and dinner

  6. 40 CFR 63.10390 - What management practice standard must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 14 2010-07-01 2010-07-01 false What management practice standard must I meet? 63.10390 Section 63.10390 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY....10390 What management practice standard must I meet? You must sterilize full loads of items having a...

  7. 40 CFR 63.8248 - What other requirements must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meet each emission limitation in § 63.8190 that applies to you. This includes periods of startup... standard in § 63.8192 that applies to you. This includes periods of startup, shutdown, and malfunction. (3... range. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1...

  8. 77 FR 52061 - 163rd Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 163rd Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Teleconference Meeting Pursuant to the.... 1142, the 163rd open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans...

  9. 40 CFR 63.8684 - What emission limitations must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Asphalt Processing and Asphalt Roofing Manufacturing Emission Limitations § 63.8684 What emission limitations must I meet? (a) You must meet each...

  10. 40 CFR 63.8248 - What other requirements must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... startup, shutdown, and malfunction. (2) You must report each instance in which you did not meet each work practice standard in § 63.8192 that applies to you. This includes periods of startup, shutdown, and... value was out of range. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63...

  11. 40 CFR 63.8248 - What other requirements must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... startup, shutdown, and malfunction. (2) You must report each instance in which you did not meet each work practice standard in § 63.8192 that applies to you. This includes periods of startup, shutdown, and... value was out of range. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63...

  12. 40 CFR 63.8248 - What other requirements must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... startup, shutdown, and malfunction. (2) You must report each instance in which you did not meet each work practice standard in § 63.8192 that applies to you. This includes periods of startup, shutdown, and... value was out of range. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63...

  13. 40 CFR 63.2475 - What requirements must I meet for transfer racks?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... transfer racks? 63.2475 Section 63.2475 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... must I meet for transfer racks? (a) You must comply with each emission limit and work practice standard in table 5 to this subpart that applies to your transfer racks, and you must meet each applicable...

  14. 75 FR 57063 - 153rd Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 153rd Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority contained in Section 512 of the Employee Retirement Income Security Act of 1974 (ERISA), 29 U.S.C. 1142, the 153rd open meeting of the Advisory Council on...

  15. 40 CFR 63.1178 - For cupolas, what standards must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meet? 63.1178 Section 63.1178 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Mineral Wool Production Standards...

  16. 40 CFR 63.1178 - For cupolas, what standards must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meet? 63.1178 Section 63.1178 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Mineral Wool Production Standards...

  17. 40 CFR 63.1178 - For cupolas, what standards must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet? 63.1178 Section 63.1178 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Mineral Wool Production Standards...

  18. 40 CFR 63.1178 - For cupolas, what standards must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meet? 63.1178 Section 63.1178 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Mineral Wool Production Standards...

  19. 40 CFR 63.4292 - What operating limits must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Limitations § 63.4292 What operating limits must I meet? (a) For any web coating/printing operation, slashing operation, or dyeing/finishing operation on which you use the compliant material option; web coating..., you are not required to meet any operating limits. (b) For any controlled web coating/printing...

  20. 40 CFR 63.1188 - What performance test requirements must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance Tests and Methods § 63.1188 What performance test requirements must I meet? You must meet the... numerical emission limit for PM, CO, or formaldehyde, or at the inlet and outlet of the control device if...

  1. 40 CFR 63.7895 - What emissions limitations and work practice standards must I meet for tanks?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... practice standards must I meet for tanks? 63.7895 Section 63.7895 Protection of Environment ENVIRONMENTAL... Remediation Tanks § 63.7895 What emissions limitations and work practice standards must I meet for tanks? (a... vapor pressure (expressed in kilopascals (kPa)) of the remediation material placed in your tank using...

  2. 40 CFR 63.7895 - What emissions limitations and work practice standards must I meet for tanks?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... practice standards must I meet for tanks? 63.7895 Section 63.7895 Protection of Environment ENVIRONMENTAL... Remediation Tanks § 63.7895 What emissions limitations and work practice standards must I meet for tanks? (a... vapor pressure (expressed in kilopascals (kPa)) of the remediation material placed in your tank using...

  3. 40 CFR 63.7895 - What emissions limitations and work practice standards must I meet for tanks?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... practice standards must I meet for tanks? 63.7895 Section 63.7895 Protection of Environment ENVIRONMENTAL... Remediation Tanks § 63.7895 What emissions limitations and work practice standards must I meet for tanks? (a... vapor pressure (expressed in kilopascals (kPa)) of the remediation material placed in your tank using...

  4. 40 CFR 63.7895 - What emissions limitations and work practice standards must I meet for tanks?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... practice standards must I meet for tanks? 63.7895 Section 63.7895 Protection of Environment ENVIRONMENTAL... Remediation Tanks § 63.7895 What emissions limitations and work practice standards must I meet for tanks? (a... vapor pressure (expressed in kilopascals (kPa)) of the remediation material placed in your tank using...

  5. 40 CFR 63.7296 - What emission limitations must I meet for battery stacks?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for battery stacks? 63.7296 Section 63.7296 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., Quenching, and Battery Stacks Emission Limitations and Work Practice Standards § 63.7296 What emission limitations must I meet for battery stacks? You must not discharge to the atmosphere any emissions from any...

  6. 40 CFR 63.7296 - What emission limitations must I meet for battery stacks?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for battery stacks? 63.7296 Section 63.7296 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., Quenching, and Battery Stacks Emission Limitations and Work Practice Standards § 63.7296 What emission limitations must I meet for battery stacks? You must not discharge to the atmosphere any emissions from any...

  7. 40 CFR 63.7296 - What emission limitations must I meet for battery stacks?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for battery stacks? 63.7296 Section 63.7296 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., Quenching, and Battery Stacks Emission Limitations and Work Practice Standards § 63.7296 What emission limitations must I meet for battery stacks? You must not discharge to the atmosphere any emissions from any...

  8. 40 CFR 63.7296 - What emission limitations must I meet for battery stacks?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for battery stacks? 63.7296 Section 63.7296 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., Quenching, and Battery Stacks Emission Limitations and Work Practice Standards § 63.7296 What emission limitations must I meet for battery stacks? You must not discharge to the atmosphere any emissions from any...

  9. 40 CFR 63.7296 - What emission limitations must I meet for battery stacks?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for battery stacks? 63.7296 Section 63.7296 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., Quenching, and Battery Stacks Emission Limitations and Work Practice Standards § 63.7296 What emission limitations must I meet for battery stacks? You must not discharge to the atmosphere any emissions from any...

  10. 40 CFR 63.4893 - What work practice standards must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Limitations § 63.4893 What work practice standards must I meet? (a) For any coating operation or group of... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What work practice standards must I... controls option to demonstrate compliance, you are not required to meet any work practice standards. (b...

  11. View from... JSAP Spring Meeting 2016: Ultrashort interactions

    NASA Astrophysics Data System (ADS)

    Horiuchi, Noriaki

    2016-06-01

    At the 63rd Spring Meeting of the Japan Society of Applied Physics, scientists described how femtosecond laser pulses can be used to perform tasks such as quantum beat spectroscopy, control of magnetization, cell sorting and crystal growth.

  12. 40 CFR 63.7885 - What are the general standards I must meet for my affected process vents?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet for my affected process vents? 63.7885 Section 63.7885 Protection of Environment ENVIRONMENTAL... Remediation General Standards § 63.7885 What are the general standards I must meet for my affected process...) You determine for the remediation material treated or managed by the process vented through the...

  13. 40 CFR 63.7885 - What are the general standards I must meet for my affected process vents?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meet for my affected process vents? 63.7885 Section 63.7885 Protection of Environment ENVIRONMENTAL... Remediation General Standards § 63.7885 What are the general standards I must meet for my affected process...) You determine for the remediation material treated or managed by the process vented through the...

  14. 40 CFR 63.7885 - What are the general standards I must meet for my affected process vents?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meet for my affected process vents? 63.7885 Section 63.7885 Protection of Environment ENVIRONMENTAL... Remediation General Standards § 63.7885 What are the general standards I must meet for my affected process...) You determine for the remediation material treated or managed by the process vented through the...

  15. 40 CFR 63.7885 - What are the general standards I must meet for my affected process vents?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meet for my affected process vents? 63.7885 Section 63.7885 Protection of Environment ENVIRONMENTAL... Remediation General Standards § 63.7885 What are the general standards I must meet for my affected process...) You determine for the remediation material treated or managed by the process vented through the...

  16. 40 CFR 63.3321 - What operating limits must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards for Hazardous Air Pollutants: Paper and Other Web Coating Emission Standards and Compliance Dates § 63.3321 What operating limits must I meet? (a) For any web coating line or group of web coating lines...

  17. The 23rd Annual Meeting of the European Tissue Repair Society (ETRS) in Reims, France

    PubMed Central

    2014-01-01

    The 23rd Annual Meeting of the European Tissue Repair Society, Reims, France, October 23 to 25, 2013 focused on tissue repair and regenerative medicine covering topics such as stem cells, biomaterials, tissue engineering, and burns. PMID:24552134

  18. The use of a sweetener substitution method to predict dietary exposures for the intense sweetener rebaudioside A.

    PubMed

    Renwick, A G

    2008-07-01

    There are more published dietary exposure data for intense sweeteners than for any other group of food additives. Data are available for countries with different patterns of sweetener approvals and also for population groups with high potential intakes, such as children and diabetic subjects. These data provide a secure basis for predicting the potential intakes of a novel intense sweetener by adjustment of the reported intakes of different sweeteners in mg/kg body weight by their relative sweetness intensities. This approach allows the possibility that a novel sweetener attains the same pattern and extent of use as the existing sweeteners. The intakes by high consumers of other sweeteners allows for possible brand loyalty to the novel sweetener. Using this method, the estimated dietary exposures for rebaudioside A in average and high consumers are predicted to be 1.3 and 3.4mg/kg body weight per day for the general population, 2.1 and 5.0mg/kg body weight per day for children and 3.4 and 4.5mg/kg body weight per day for children with diabetes. The temporary ADI defined by the JECFA for steviol glycosides [JECFA, 2005. Steviol glycosides. In: 63rd Meeting of the Joint FAO/WHO Expert Committee on Food Additives. World Health Organization (WHO), Geneva, Switzerland, WHO Technical Report Series 928, pp. 34-39] was set at 0-2mg/kg body weight (expressed as steviol equivalents); after correction for the difference in molecular weights, these estimated intakes of rebaudioside A are equivalent to daily steviol intakes of less than 2mg/kg. In consequence, this analysis shows that the intakes of rebaudioside A would not exceed the JECFA temporary ADI set for steviol glycosides.

  19. 40 CFR 63.5715 - What operating limits must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants for Boat Manufacturing Demonstrating Compliance for Open Molding Operations Controlled by Add-on Control Devices § 63.5715 What operating limits must I meet? (a) For open...

  20. 40 CFR 63.3320 - What emission standards must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What emission standards must I meet? 63... (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Paper and Other Web Coating Emission Standards...

  1. 40 CFR 63.5984 - What emission limits must I meet for tire production affected sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... tire production affected sources? 63.5984 Section 63.5984 Protection of Environment ENVIRONMENTAL... POLLUTANTS FOR SOURCE CATEGORIES National Emissions Standards for Hazardous Air Pollutants: Rubber Tire Manufacturing Emission Limits for Tire Production Affected Sources § 63.5984 What emission limits must I meet...

  2. The role of validated analytical methods in JECFA drug assessments and evaluation for recommending MRLs.

    PubMed

    Boison, Joe O

    2016-05-01

    The Joint Food and Agriculture Organization and World Health Organization (FAO/WHO) Expert Committee on Food Additives (JECFA) is one of three Codex committees tasked with applying risk analysis and relying on independent scientific advice provided by expert bodies organized by FAO/WHO when developing standards. While not officially part of the Codex Alimentarius Commission structure, JECFA provides independent scientific advice to the Commission and its specialist committees such as the Codex Committee on Residues of Veterinary Drugs in Foods (CCRVDF) in setting maximum residue limits (MRLs) for veterinary drugs. Codex methods of analysis (Types I, II, III, and IV) are defined in the Codex Procedural Manual as are criteria to be used for selecting methods of analysis. However, if a method is to be used under a single laboratory condition to support regulatory work, it must be validated according to an internationally recognized protocol and the use of the method must be embedded in a quality assurance system in compliance with ISO/IEC 17025:2005. This paper examines the attributes of the methods used to generate residue depletion data for drug registration and/or licensing and for supporting regulatory enforcement initiatives that experts consider to be useful and appropriate in their assessment of methods of analysis. Copyright © 2016 Her Majesty the Queen in Right of Canada. Drug Testing and Analysis © 2016 John Wiley & Sons, Ltd. © 2016 Her Majesty the Queen in Right of Canada. Drug Testing and Analysis © 2016 John Wiley & Sons, Ltd.

  3. 40 CFR 63.3320 - What emission standards must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What emission standards must I meet? 63... (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants: Paper and Other Web Coating Emission Standards and Compliance Dates...

  4. 40 CFR 63.7886 - What are the general standards I must meet for my affected remediation material management units?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meet for my affected remediation material management units? 63.7886 Section 63.7886 Protection of... Hazardous Air Pollutants: Site Remediation General Standards § 63.7886 What are the general standards I must meet for my affected remediation material management units? (a) For each remediation material...

  5. 40 CFR 63.7884 - What are the general standards I must meet for each site remediation with affected sources?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet for each site remediation with affected sources? 63.7884 Section 63.7884 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation General Standards § 63.7884 What are the general standards I must meet for each...

  6. 40 CFR 63.7884 - What are the general standards I must meet for each site remediation with affected sources?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meet for each site remediation with affected sources? 63.7884 Section 63.7884 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation General Standards § 63.7884 What are the general standards I must meet for each...

  7. 40 CFR 63.7884 - What are the general standards I must meet for each site remediation with affected sources?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meet for each site remediation with affected sources? 63.7884 Section 63.7884 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation General Standards § 63.7884 What are the general standards I must meet for each...

  8. 40 CFR 63.7884 - What are the general standards I must meet for each site remediation with affected sources?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meet for each site remediation with affected sources? 63.7884 Section 63.7884 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation General Standards § 63.7884 What are the general standards I must meet for each...

  9. 40 CFR 63.7884 - What are the general standards I must meet for each site remediation with affected sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meet for each site remediation with affected sources? 63.7884 Section 63.7884 Protection of Environment... Pollutants: Site Remediation General Standards § 63.7884 What are the general standards I must meet for each site remediation with affected sources? (a) For each site remediation with an affected source...

  10. 40 CFR 63.4292 - What operating limits must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... systems on the web coating/printing operation(s) and dyeing/finishing operations for which you use this... Limitations § 63.4292 What operating limits must I meet? (a) For any web coating/printing operation, slashing operation, or dyeing/finishing operation on which you use the compliant material option; web coating...

  11. 40 CFR 63.4292 - What operating limits must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Other Textiles Emission Limitations § 63.4292 What operating limits must I meet? (a) For any web coating... material option; web coating/printing operation or dyeing/finishing operation on which you use the emission... controlled web coating/printing operation or dyeing/finishing operation on which you use the emission rate...

  12. 40 CFR 63.4292 - What operating limits must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Other Textiles Emission Limitations § 63.4292 What operating limits must I meet? (a) For any web coating... material option; web coating/printing operation or dyeing/finishing operation on which you use the emission... controlled web coating/printing operation or dyeing/finishing operation on which you use the emission rate...

  13. 40 CFR 63.4292 - What operating limits must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Other Textiles Emission Limitations § 63.4292 What operating limits must I meet? (a) For any web coating... material option; web coating/printing operation or dyeing/finishing operation on which you use the emission... controlled web coating/printing operation or dyeing/finishing operation on which you use the emission rate...

  14. 40 CFR 63.4492 - What operating limits must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for Hazardous Air Pollutants for Surface Coating of Plastic Parts and Products Emission Limitations § 63.4492 What operating limits must I meet? (a) For any coating operation(s) on which you use the... any operating limits. (b) For any controlled coating operation(s) on which you use the emission rate...

  15. 40 CFR 63.3321 - What operating limits must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) National Emission Standards for Hazardous Air Pollutants: Paper and Other Web Coating Emission Standards and Compliance Dates § 63.3321 What operating limits must I meet? (a) For any web coating line or group of web coating lines for which you use add-on control devices, unless you use a solvent recovery...

  16. 40 CFR 63.3321 - What operating limits must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) National Emission Standards for Hazardous Air Pollutants: Paper and Other Web Coating Emission Standards and Compliance Dates § 63.3321 What operating limits must I meet? (a) For any web coating line or group of web coating lines for which you use add-on control devices, unless you use a solvent recovery...

  17. 40 CFR 63.3321 - What operating limits must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) National Emission Standards for Hazardous Air Pollutants: Paper and Other Web Coating Emission Standards and Compliance Dates § 63.3321 What operating limits must I meet? (a) For any web coating line or group of web coating lines for which you use add-on control devices, unless you use a solvent recovery...

  18. 40 CFR 63.5743 - What standards must I meet for aluminum recreational boat surface coating operations?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... aluminum recreational boat surface coating operations? 63.5743 Section 63.5743 Protection of Environment... Pollutants for Boat Manufacturing Standards for Aluminum Recreational Boat Surface Coating Operations § 63.5743 What standards must I meet for aluminum recreational boat surface coating operations? (a) For...

  19. 40 CFR 63.5810 - What are my options for meeting the standards for open molding and centrifugal casting operations...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... standards for open molding and centrifugal casting operations at new and existing sources? 63.5810 Section... Meeting Standards § 63.5810 What are my options for meeting the standards for open molding and centrifugal...) through (d) of this section to meet the standards for open molding or centrifugal casting operations in...

  20. 40 CFR 63.3321 - What operating limits must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for Hazardous Air Pollutants: Paper and Other Web Coating Emission Standards and Compliance Dates § 63.3321 What operating limits must I meet? (a) For any web coating line or group of web coating lines for which you use add-on control devices, unless you use a solvent recovery system and conduct a...

  1. 40 CFR 63.5731 - What standards must I meet for resin and gel coat mixing operations?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and gel coat mixing operations? 63.5731 Section 63.5731 Protection of Environment ENVIRONMENTAL... Boat Manufacturing Standards for Resin and Gel Coat Mixing Operations § 63.5731 What standards must I meet for resin and gel coat mixing operations? (a) All resin and gel coat mixing containers with a...

  2. 40 CFR 63.5731 - What standards must I meet for resin and gel coat mixing operations?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and gel coat mixing operations? 63.5731 Section 63.5731 Protection of Environment ENVIRONMENTAL... Boat Manufacturing Standards for Resin and Gel Coat Mixing Operations § 63.5731 What standards must I meet for resin and gel coat mixing operations? (a) All resin and gel coat mixing containers with a...

  3. 40 CFR 63.5731 - What standards must I meet for resin and gel coat mixing operations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and gel coat mixing operations? 63.5731 Section 63.5731 Protection of Environment ENVIRONMENTAL... Boat Manufacturing Standards for Resin and Gel Coat Mixing Operations § 63.5731 What standards must I meet for resin and gel coat mixing operations? (a) All resin and gel coat mixing containers with a...

  4. 40 CFR 63.5740 - What emission limit must I meet for carpet and fabric adhesive operations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... carpet and fabric adhesive operations? 63.5740 Section 63.5740 Protection of Environment ENVIRONMENTAL... Manufacturing Standards for Carpet and Fabric Adhesive Operations § 63.5740 What emission limit must I meet for carpet and fabric adhesive operations? (a) You must use carpet and fabric adhesives that contain no more...

  5. 40 CFR 63.5731 - What standards must I meet for resin and gel coat mixing operations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and gel coat mixing operations? 63.5731 Section 63.5731 Protection of Environment ENVIRONMENTAL... Manufacturing Standards for Resin and Gel Coat Mixing Operations § 63.5731 What standards must I meet for resin and gel coat mixing operations? (a) All resin and gel coat mixing containers with a capacity equal to...

  6. 40 CFR 63.5731 - What standards must I meet for resin and gel coat mixing operations?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and gel coat mixing operations? 63.5731 Section 63.5731 Protection of Environment ENVIRONMENTAL... Manufacturing Standards for Resin and Gel Coat Mixing Operations § 63.5731 What standards must I meet for resin and gel coat mixing operations? (a) All resin and gel coat mixing containers with a capacity equal to...

  7. 40 CFR 63.5810 - What are my options for meeting the standards for open molding and centrifugal casting operations...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... standards for open molding and centrifugal casting operations at new and existing sources? 63.5810 Section... § 63.5810 What are my options for meeting the standards for open molding and centrifugal casting... (d) of this section to meet the standards for open molding or centrifugal casting operations in Table...

  8. 40 CFR 63.5810 - What are my options for meeting the standards for open molding and centrifugal casting operations...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... standards for open molding and centrifugal casting operations at new and existing sources? 63.5810 Section... § 63.5810 What are my options for meeting the standards for open molding and centrifugal casting... (d) of this section to meet the standards for open molding or centrifugal casting operations in Table...

  9. 40 CFR 63.11092 - What testing and monitoring requirements must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 15 2013-07-01 2013-07-01 false What testing and monitoring... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Testing and Monitoring Requirements § 63.11092 What testing and monitoring requirements must I meet? (a) Each owner or operator of a bulk...

  10. 40 CFR 63.11092 - What testing and monitoring requirements must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 15 2012-07-01 2012-07-01 false What testing and monitoring... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Testing and Monitoring Requirements § 63.11092 What testing and monitoring requirements must I meet? (a) Each owner or operator of a bulk...

  11. 40 CFR 63.11092 - What testing and monitoring requirements must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 15 2014-07-01 2014-07-01 false What testing and monitoring... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Testing and Monitoring Requirements § 63.11092 What testing and monitoring requirements must I meet? (a) Each owner or operator of a bulk...

  12. 40 CFR 63.11092 - What testing and monitoring requirements must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 14 2010-07-01 2010-07-01 false What testing and monitoring... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Testing and Monitoring Requirements § 63.11092 What testing and monitoring requirements must I meet? (a) Each owner or operator subject to the...

  13. 40 CFR 63.11092 - What testing and monitoring requirements must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 14 2011-07-01 2011-07-01 false What testing and monitoring... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Testing and Monitoring Requirements § 63.11092 What testing and monitoring requirements must I meet? (a) Each owner or operator of a bulk...

  14. 40 CFR Table 4 to Subpart Mmm of... - Control Requirements for Items of Equipment That Meet the Criteria of § 63.1362(k)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Control Requirements for Items of Equipment That Meet the Criteria of § 63.1362(k) 4 Table 4 to Subpart MMM of Part 63 Protection of... Part 63—Control Requirements for Items of Equipment That Meet the Criteria of § 63.1362(k) Item of...

  15. 40 CFR 63.5698 - What emission limit must I meet for open molding resin and gel coat operations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... open molding resin and gel coat operations? 63.5698 Section 63.5698 Protection of Environment... AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants for Boat Manufacturing Standards for Open Molding Resin and Gel Coat Operations § 63.5698 What emission limit must I meet...

  16. 40 CFR Table 4 to Subpart Mmm of... - Control Requirements for Items of Equipment That Meet the Criteria of § 63.1362(k)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 12 2014-07-01 2014-07-01 false Control Requirements for Items of Equipment That Meet the Criteria of § 63.1362(k) 4 Table 4 to Subpart MMM of Part 63 Protection of... Subpart MMM of Part 63—Control Requirements for Items of Equipment That Meet the Criteria of § 63.1362(k...

  17. 40 CFR 63.7895 - What emissions limitations and work practice standards must I meet for tanks?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Remediation Tanks § 63.7895 What emissions limitations and work practice standards must I meet for tanks? (a... vapor pressure (expressed in kilopascals (kPa)) of the remediation material placed in your tank using the procedures specified in § 63.7944. (2) If the maximum HAP vapor pressure of the remediation...

  18. 40 CFR 63.2241 - What are the work practice requirements and how must I meet them?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Products Compliance Options, Operating Requirements, and Work Practice Requirements § 63.2241 What are the...) If you have a dry rotary dryer, you may choose to designate your dry rotary dryer as a green rotary dryer and meet the more stringent compliance options and operating requirements in § 63.2240 for green...

  19. PREFACE: 3rd International Meeting on Silicene (IMS-3)

    NASA Astrophysics Data System (ADS)

    Kara, Abdelkader; Enriquez, Hanna; Lemaire, Jean Louis; Oughaddou, Hamid

    2014-03-01

    . Historical summary Every two years, the STARM (science, technologie avanc\\'ee et recherche pour la Mediterran\\'ee, http://www.starm.emcmre.org/) society is organizing an international conference entitled Euro-Mediterranean Conference on Materials and Renewable Energies (EMCMRE, http://www.emcmre.org/) in countries across the Mediterranean Sea. It is in this framework that an international meeting dedicated to silicene is organized simultaneously since 2010: 1st International Meeting of Silicene (IMS-1), Safi, Morocco, 2010 2nd International Meeting of Silicene (IMS-2), Marrakech, Morocco, 2011 3rd International Meeting of Silicene (IMS-3), Istres-Marseille, France, 2013 Conference pictures are available in the PDF

  20. 40 CFR 63.5987 - What are my alternatives for meeting the emission limits for tire cord production affected sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the emission limits for tire cord production affected sources? 63.5987 Section 63.5987 Protection of... Pollutants: Rubber Tire Manufacturing Emission Limits for Tire Cord Production Affected Sources § 63.5987 What are my alternatives for meeting the emission limits for tire cord production affected sources? You...

  1. 40 CFR 63.7936 - What requirements must I meet if I transfer remediation material off-site to another facility?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... transfer remediation material off-site to another facility? 63.7936 Section 63.7936 Protection of... Hazardous Air Pollutants: Site Remediation General Compliance Requirements § 63.7936 What requirements must I meet if I transfer remediation material off-site to another facility? (a) If you transfer to...

  2. 40 CFR 63.7293 - What work practice standards must I meet for fugitive pushing emissions if I have a non-recovery...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meet for fugitive pushing emissions if I have a non-recovery coke oven battery? 63.7293 Section 63.7293... Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Emission... pushing emissions if I have a non-recovery coke oven battery? (a) You must meet the requirements in...

  3. 40 CFR 63.7293 - What work practice standards must I meet for fugitive pushing emissions if I have a non-recovery...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meet for fugitive pushing emissions if I have a non-recovery coke oven battery? 63.7293 Section 63.7293... Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Emission... pushing emissions if I have a non-recovery coke oven battery? (a) You must meet the requirements in...

  4. 40 CFR 63.7293 - What work practice standards must I meet for fugitive pushing emissions if I have a non-recovery...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meet for fugitive pushing emissions if I have a non-recovery coke oven battery? 63.7293 Section 63.7293... Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Emission... pushing emissions if I have a non-recovery coke oven battery? (a) You must meet the requirements in...

  5. 40 CFR 63.7293 - What work practice standards must I meet for fugitive pushing emissions if I have a non-recovery...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meet for fugitive pushing emissions if I have a non-recovery coke oven battery? 63.7293 Section 63.7293... Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Emission... pushing emissions if I have a non-recovery coke oven battery? (a) You must meet the requirements in...

  6. 40 CFR 63.7293 - What work practice standards must I meet for fugitive pushing emissions if I have a non-recovery...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet for fugitive pushing emissions if I have a non-recovery coke oven battery? 63.7293 Section 63.7293... Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Emission... pushing emissions if I have a non-recovery coke oven battery? (a) You must meet the requirements in...

  7. 40 CFR 63.2485 - What requirements must I meet for wastewater streams and liquid streams in open systems within an...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... wastewater streams and liquid streams in open systems within an MCPU? 63.2485 Section 63.2485 Protection of... Standards, and Compliance Requirements § 63.2485 What requirements must I meet for wastewater streams and... subpart that applies to your wastewater streams and liquid streams in open systems within an MCPU, except...

  8. 40 CFR 63.2485 - What requirements must I meet for wastewater streams and liquid streams in open systems within an...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wastewater streams and liquid streams in open systems within an MCPU? 63.2485 Section 63.2485 Protection of... Standards, and Compliance Requirements § 63.2485 What requirements must I meet for wastewater streams and... subpart that applies to your wastewater streams and liquid streams in open systems within an MCPU, except...

  9. 40 CFR 63.2485 - What requirements must I meet for wastewater streams and liquid streams in open systems within an...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wastewater streams and liquid streams in open systems within an MCPU? 63.2485 Section 63.2485 Protection of... Standards, and Compliance Requirements § 63.2485 What requirements must I meet for wastewater streams and... subpart that applies to your wastewater streams and liquid streams in open systems within an MCPU, except...

  10. 40 CFR 63.2485 - What requirements must I meet for wastewater streams and liquid streams in open systems within an...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wastewater streams and liquid streams in open systems within an MCPU? 63.2485 Section 63.2485 Protection of... Compliance Requirements § 63.2485 What requirements must I meet for wastewater streams and liquid streams in... to your wastewater streams and liquid streams in open systems within an MCPU, except as specified in...

  11. 40 CFR 63.1003 - Equipment identification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Equipment identification. 63.1003... device, under the provisions of § 63.1007(e)(3) (pumps in light liquid service), § 63.1009(e)(3... meeting the provisions of § 63.1007(e)(5), connectors meeting the provisions of § 63.1008(d)(1), and...

  12. 40 CFR 63.5728 - What standards must I meet for closed molding resin operations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operation does not meet the definition of closed molding, then you must comply with the limit for open... molding operation must comply with the limit for open molding resin and gel coat operations specified in § 63.5698. Examples of these operations include gel coat or skin coat layers that are applied before...

  13. 40 CFR 63.2465 - What requirements must I meet for process vents that emit hydrogen halide and halogen HAP or HAP...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... process vents that emit hydrogen halide and halogen HAP or HAP metals? 63.2465 Section 63.2465 Protection... Compliance Requirements § 63.2465 What requirements must I meet for process vents that emit hydrogen halide... section. (b) If any process vents within a process emit hydrogen halide and halogen HAP, you must...

  14. 40 CFR 63.7885 - What are the general standards I must meet for my affected process vents?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Remediation General Standards § 63.7885 What are the general standards I must meet for my affected process...) You determine for the remediation material treated or managed by the process vented through the...

  15. 40 CFR 63.1005 - Leak repair.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Leak repair. 63.1005 Section 63.1005... section are met. (A) A dual mechanical seal system that meets the requirements of § 63.1007(e)(1) will be installed, (B) A pump that meets the requirements of § 63.1007(e)(2) will be installed; or (C) A system that...

  16. 40 CFR 63.7887 - What are the general standards I must meet for my affected equipment leak sources?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation General Standards § 63.7887 What are the general standards I must meet for my...

  17. 40 CFR 63.7887 - What are the general standards I must meet for my affected equipment leak sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation General Standards § 63.7887 What are the general standards I must meet for my...

  18. 40 CFR 63.7887 - What are the general standards I must meet for my affected equipment leak sources?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation General Standards § 63.7887 What are the general standards I must meet for my...

  19. 40 CFR 63.7887 - What are the general standards I must meet for my affected equipment leak sources?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation General Standards § 63.7887 What are the general standards I must meet for my...

  20. 40 CFR 63.7887 - What are the general standards I must meet for my affected equipment leak sources?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation General Standards § 63.7887 What are the general standards I must meet for my...

  1. 40 CFR 63.6604 - What fuel requirements must I meet if I own or operate an existing stationary CI RICE?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... I own or operate an existing stationary CI RICE? 63.6604 Section 63.6604 Protection of Environment....6604 What fuel requirements must I meet if I own or operate an existing stationary CI RICE? If you own or operate an existing non-emergency, non-black start CI stationary RICE with a site rating of more...

  2. 40 CFR 63.6604 - What fuel requirements must I meet if I own or operate an existing stationary CI RICE?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... I own or operate an existing stationary CI RICE? 63.6604 Section 63.6604 Protection of Environment....6604 What fuel requirements must I meet if I own or operate an existing stationary CI RICE? If you own or operate an existing non-emergency CI stationary RICE with a site rating of more than 300 brake HP...

  3. Meeting Report of the 33rd Annual Meeting of the Academy of Surgical Research: Summary of Presentations, Labs, and Workshops, Focusing on Experimental Surgery, Las Vegas, NV, October 4-6, 2017.

    PubMed

    Graham, Melanie L; Ziegelhofer, Tracy; Ehrmann, Jon

    2018-04-11

    The 33rd Annual Meeting of the Academy of Surgical Research was held from October 4 to 6, 2017 in Las Vegas, Nevada. The meeting welcomed >160 participants from 27 different states and five countries representing the organization's diverse membership of technicians, veterinarians, medical doctors, and biomedical researchers. The Academy's annual meeting is focused on promoting the advancement of professional and academic standards, education, and research related to the art and science of experimental surgery. Presentations included four invited keynote speakers and 30 selected lectures and posters. A primary strength of the meeting was that lectures were complimented with practical sessions that included four wet lab and two dry lab half-day courses. Likewise, participants were brought together in workshops emphasizing research workflow from starting experimental design to readying results for publication. In this report, we present the highlights from this meeting and some selected abstracts that illustrate the diverse scientific expertise of the Academy and progress in surgical research.

  4. 40 CFR 63.6603 - What emission limitations and operating limitations must I meet if I own or operate an existing...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operating limitations must I meet if I own or operate an existing stationary RICE located at an area source... operating limitations must I meet if I own or operate an existing stationary RICE located at an area source... procedures in § 63.6620 and Table 4 to this subpart. (a) If you own or operate an existing stationary RICE...

  5. 40 CFR 63.7292 - What work practice standards must I meet for fugitive pushing emissions if I have a by-product...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meet for fugitive pushing emissions if I have a by-product coke oven battery with horizontal flues? 63...) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery... meet for fugitive pushing emissions if I have a by-product coke oven battery with horizontal flues? (a...

  6. 40 CFR 63.7291 - What work practice standards must I meet for fugitive pushing emissions if I have a by-product...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meet for fugitive pushing emissions if I have a by-product coke oven battery with vertical flues? 63...) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery... meet for fugitive pushing emissions if I have a by-product coke oven battery with vertical flues? (a...

  7. 40 CFR 63.7291 - What work practice standards must I meet for fugitive pushing emissions if I have a by-product...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meet for fugitive pushing emissions if I have a by-product coke oven battery with vertical flues? 63...) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery... meet for fugitive pushing emissions if I have a by-product coke oven battery with vertical flues? (a...

  8. 40 CFR 63.7292 - What work practice standards must I meet for fugitive pushing emissions if I have a by-product...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meet for fugitive pushing emissions if I have a by-product coke oven battery with horizontal flues? 63...) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery... meet for fugitive pushing emissions if I have a by-product coke oven battery with horizontal flues? (a...

  9. 40 CFR 63.7291 - What work practice standards must I meet for fugitive pushing emissions if I have a by-product...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meet for fugitive pushing emissions if I have a by-product coke oven battery with vertical flues? 63...) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery... meet for fugitive pushing emissions if I have a by-product coke oven battery with vertical flues? (a...

  10. 40 CFR 63.7292 - What work practice standards must I meet for fugitive pushing emissions if I have a by-product...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet for fugitive pushing emissions if I have a by-product coke oven battery with horizontal flues? 63...) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery... meet for fugitive pushing emissions if I have a by-product coke oven battery with horizontal flues? (a...

  11. 40 CFR 63.7292 - What work practice standards must I meet for fugitive pushing emissions if I have a by-product...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meet for fugitive pushing emissions if I have a by-product coke oven battery with horizontal flues? 63...) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery... meet for fugitive pushing emissions if I have a by-product coke oven battery with horizontal flues? (a...

  12. 40 CFR 63.7291 - What work practice standards must I meet for fugitive pushing emissions if I have a by-product...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meet for fugitive pushing emissions if I have a by-product coke oven battery with vertical flues? 63...) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery... meet for fugitive pushing emissions if I have a by-product coke oven battery with vertical flues? (a...

  13. 40 CFR 63.7292 - What work practice standards must I meet for fugitive pushing emissions if I have a by-product...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meet for fugitive pushing emissions if I have a by-product coke oven battery with horizontal flues? 63...) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery... meet for fugitive pushing emissions if I have a by-product coke oven battery with horizontal flues? (a...

  14. 40 CFR 63.7291 - What work practice standards must I meet for fugitive pushing emissions if I have a by-product...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meet for fugitive pushing emissions if I have a by-product coke oven battery with vertical flues? 63...) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery... meet for fugitive pushing emissions if I have a by-product coke oven battery with vertical flues? (a...

  15. 40 CFR 63.2465 - What requirements must I meet for process vents that emit hydrogen halide and halogen HAP or HAP...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... process vents that emit hydrogen halide and halogen HAP or HAP metals? 63.2465 Section 63.2465 Protection... hydrogen halide and halogen HAP or HAP metals? (a) You must meet each emission limit in Table 3 to this...) of this section. (b) If any process vents within a process emit hydrogen halide and halogen HAP, you...

  16. 40 CFR 63.2465 - What requirements must I meet for process vents that emit hydrogen halide and halogen HAP or HAP...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... process vents that emit hydrogen halide and halogen HAP or HAP metals? 63.2465 Section 63.2465 Protection... hydrogen halide and halogen HAP or HAP metals? (a) You must meet each emission limit in Table 3 to this...) of this section. (b) If any process vents within a process emit hydrogen halide and halogen HAP, you...

  17. 40 CFR 63.2465 - What requirements must I meet for process vents that emit hydrogen halide and halogen HAP or HAP...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... process vents that emit hydrogen halide and halogen HAP or HAP metals? 63.2465 Section 63.2465 Protection... hydrogen halide and halogen HAP or HAP metals? (a) You must meet each emission limit in Table 3 to this...) of this section. (b) If any process vents within a process emit hydrogen halide and halogen HAP, you...

  18. 40 CFR 63.5820 - What are my options for meeting the standards for continuous lamination/casting operations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: Reinforced Plastic Composites Production Options for Meeting Standards § 63.5820 What are my options for... weight percent organic HAP emissions reduction limit in Table 3 to this subpart, you have the option of demonstrating that you achieve 95 percent reduction of all wet-out area organic HAP emissions. (d) Combination...

  19. 40 CFR 63.1506 - Operating requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment according to the requirements in this section. (2) The owner or operator of an existing sweat furnace that meets the specifications of § 63.1505(f)(1) must operate the sweat furnace and control.... (3) The owner or operator of a new sweat furnace that meets the specifications of § 63.1505(f)(1...

  20. 40 CFR 63.1506 - Operating requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment according to the requirements in this section. (2) The owner or operator of an existing sweat furnace that meets the specifications of § 63.1505(f)(1) must operate the sweat furnace and control.... (3) The owner or operator of a new sweat furnace that meets the specifications of § 63.1505(f)(1...

  1. 40 CFR 63.1506 - Operating requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... an existing sweat furnace that meets the specifications of § 63.1505(f)(1) must operate the sweat... date of this standard. (3) The owner or operator of a new sweat furnace that meets the specifications of § 63.1505(f)(1) must operate the sweat furnace and control equipment according to the requirements...

  2. 40 CFR 63.1506 - Operating requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... an existing sweat furnace that meets the specifications of § 63.1505(f)(1) must operate the sweat... date of this standard. (3) The owner or operator of a new sweat furnace that meets the specifications of § 63.1505(f)(1) must operate the sweat furnace and control equipment according to the requirements...

  3. 40 CFR 63.5985 - What are my alternatives for meeting the emission limits for tire production affected sources?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission limits in § 63.5984. (a) Purchase alternative. Use only cements and solvents that, as purchased... constituent option). (b) Monthly average alternative, without using an add-on control device. Use cements and... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my alternatives for meeting...

  4. 40 CFR 63.5985 - What are my alternatives for meeting the emission limits for tire production affected sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission limits in § 63.5984. (a) Purchase alternative. Use only cements and solvents that, as purchased... constituent option). (b) Monthly average alternative, without using an add-on control device. Use cements and... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my alternatives for meeting...

  5. 40 CFR 63.1330 - Wastewater provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... through 63.149. (i) When §§ 63.132 through 63.149 refer to table 8 compounds, the owner or operator is....149 refer to table 9 compounds, the owner or operator is only required to consider compounds that meet the definition of organic HAP in § 63.1312 and that are listed on table 9 of 40 CFR part 63, subpart G...

  6. 40 CFR 63.1330 - Wastewater provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... through 63.149. (i) When §§ 63.132 through 63.149 refer to table 8 compounds, the owner or operator is....149 refer to table 9 compounds, the owner or operator is only required to consider compounds that meet the definition of organic HAP in § 63.1312 and that are listed on table 9 of 40 CFR part 63, subpart G...

  7. 7 CFR 948.63 - Duties.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Duties. 948.63 Section 948.63 Agriculture Regulations... Regulating Handling Committees § 948.63 Duties. (a) Each committee shall: (1) Meet and organize as soon as... define the duties of each; (4) Keep minutes, books, and records which clearly reflect all its acts and...

  8. 7 CFR 948.63 - Duties.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Duties. 948.63 Section 948.63 Agriculture Regulations... Regulating Handling Committees § 948.63 Duties. (a) Each committee shall: (1) Meet and organize as soon as... define the duties of each; (4) Keep minutes, books, and records which clearly reflect all its acts and...

  9. 40 CFR Table 5 to Subpart Ggg of... - Control Requirements for Items of Equipment That Meet the Criteria of § 63.1252(f)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 12 2014-07-01 2014-07-01 false Control Requirements for Items of Equipment That Meet the Criteria of § 63.1252(f) 5 Table 5 to Subpart GGG of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  10. 40 CFR Table 5 to Subpart Ggg of... - Control Requirements for Items of Equipment That Meet the Criteria of § 63.1252(f)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 12 2012-07-01 2011-07-01 true Control Requirements for Items of Equipment That Meet the Criteria of § 63.1252(f) 5 Table 5 to Subpart GGG of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  11. 40 CFR Table 5 to Subpart Ggg of... - Control Requirements for Items of Equipment That Meet the Criteria of § 63.1252(f)

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 12 2013-07-01 2013-07-01 false Control Requirements for Items of Equipment That Meet the Criteria of § 63.1252(f) 5 Table 5 to Subpart GGG of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  12. 40 CFR Table 5 to Subpart Ggg of... - Control Requirements for Items of Equipment That Meet the Criteria of § 63.1252(f)

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Control Requirements for Items of Equipment That Meet the Criteria of § 63.1252(f) 5 Table 5 to Subpart GGG of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  13. Confronting the Challenges of the Digital Era. Proceedings of the Membership Meeting of the Association of Research Libraries (133rd, Washington, DC, October 14-16, 1998).

    ERIC Educational Resources Information Center

    Bhalla, Nicole, Ed.; Barrett, Jaia, Ed.; Wetzel, Karen A., Ed.

    The 133rd meeting of the Association of Research Libraries (ARL) focused on strategies for confronting critical challenges associated with the digital era and for fostering understanding from university leaders and supporters regarding the resources needed to perform successfully in this print plus digital environment. Program Session I,…

  14. Tasks of Technical and Public Policy Experts in Educational R&D.

    ERIC Educational Resources Information Center

    Short, Edmund C.

    In order to develop and implement new governmental policies in educational research and development (R&D) which meet the needs of R&D specialists and the concerns of the public, it is important to understand the complexity of the research-development-knowledge utilization cycle and to develop a strategy which serves the public interest but…

  15. 40 CFR 63.1433 - Wastewater provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... exclusively to organic HAP listed on Table 8 of 40 CFR part 63, subpart G. (ii) When the HON requirements in §§ 63.132 through 63.149 refer to Table 9 compounds, the owner or operator is only required to consider compounds that meet the definition of organic HAP in § 63.1423 and that are listed in Table 9 of 40 CFR part...

  16. 40 CFR 63.11088 - What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11088 What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

  17. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  18. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  19. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  20. 40 CFR 63.11088 - What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11088 What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

  1. 40 CFR 63.11088 - What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11088 What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

  2. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  3. 40 CFR 63.11088 - What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11088 What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

  4. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  5. 40 CFR 63.11088 - What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11088 What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

  6. 40 CFR 63.8020 - What requirements apply to my wastewater streams?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wastewater streams? 63.8020 Section 63.8020 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... apply to my wastewater streams? (a) You must meet each requirement in Table 4 to this subpart that applies to your wastewater streams, and you must meet each applicable requirement specified in § 63.8000...

  7. 40 CFR 63.8020 - What requirements apply to my wastewater streams?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wastewater streams? 63.8020 Section 63.8020 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... apply to my wastewater streams? (a) You must meet each requirement in Table 4 to this subpart that applies to your wastewater streams, and you must meet each applicable requirement specified in § 63.8000...

  8. 40 CFR 63.8020 - What requirements apply to my wastewater streams?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wastewater streams? 63.8020 Section 63.8020 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... apply to my wastewater streams? (a) You must meet each requirement in Table 4 to this subpart that applies to your wastewater streams, and you must meet each applicable requirement specified in § 63.8000...

  9. 40 CFR 63.8020 - What requirements apply to my wastewater streams?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... wastewater streams? 63.8020 Section 63.8020 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... apply to my wastewater streams? (a) You must meet each requirement in Table 4 to this subpart that applies to your wastewater streams, and you must meet each applicable requirement specified in § 63.8000...

  10. 40 CFR 63.8020 - What requirements apply to my wastewater streams?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wastewater streams? 63.8020 Section 63.8020 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... apply to my wastewater streams? (a) You must meet each requirement in Table 4 to this subpart that applies to your wastewater streams, and you must meet each applicable requirement specified in § 63.8000...

  11. 20 CFR 631.63 - Reporting.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Reporting. 631.63 Section 631.63 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER TITLE III OF THE JOB..., delays, or adverse conditions which may materially impair the ability to meet the objectives of the...

  12. 40 CFR 63.11935 - What CEMS and CPMS requirements must I meet to demonstrate initial and continuous compliance with...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... process vents in Table 1 or 2 to this subpart. You must meet the CPMS requirements in paragraph (c) of... parameter specified in Table 5 to this subpart for each process vent control device specified in § 63.11925(b) that is used to comply with the emission limits for process vents in Table 1 or 2 to this subpart...

  13. 40 CFR 63.11935 - What CEMS and CPMS requirements must I meet to demonstrate initial and continuous compliance with...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... process vents in Table 1 or 2 to this subpart. You must meet the CPMS requirements in paragraph (c) of... parameter specified in Table 5 to this subpart for each process vent control device specified in § 63.11925(b) that is used to comply with the emission limits for process vents in Table 1 or 2 to this subpart...

  14. 40 CFR 63.11935 - What CEMS and CPMS requirements must I meet to demonstrate initial and continuous compliance with...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... process vents in Table 1 or 2 to this subpart. You must meet the CPMS requirements in paragraph (c) of... parameter specified in Table 5 to this subpart for each process vent control device specified in § 63.11925(b) that is used to comply with the emission limits for process vents in Table 1 or 2 to this subpart...

  15. 40 CFR 63.822 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 63.827(c). A material safety data sheet (MSDS) may serve as a CPDS provided the MSDS meets the data requirements of § 63.827(b) and (c). The purpose of the CPDS is to assist the owner or operator in... packaging means any package or part of a package the shape of which can be readily changed. Flexible...

  16. 40 CFR 63.774 - Recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., subpart V; or 40 CFR part 63, subpart H. (10) Records of glycol dehydration unit baseline operations... or operator of a glycol dehydration unit that meets the exemption criteria in § 63.764(e)(1)(i) or...) of this section, as appropriate, for that glycol dehydration unit. (i) The actual annual average...

  17. 40 CFR 63.774 - Recordkeeping requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., subpart V; or 40 CFR part 63, subpart H. (10) Records of glycol dehydration unit baseline operations... or operator of a glycol dehydration unit that meets the exemption criteria in § 63.764(e)(1)(i) or...) of this section, as appropriate, for that glycol dehydration unit. (i) The actual annual average...

  18. 40 CFR 63.7090 - What emission limitations must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...? 63.7090 Section 63.7090 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants Emission...

  19. 40 CFR 63.7090 - What emission limitations must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...? 63.7090 Section 63.7090 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants Emission...

  20. 40 CFR 63.7090 - What emission limitations must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...? 63.7090 Section 63.7090 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants Emission...

  1. 40 CFR 63.7090 - What emission limitations must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...? 63.7090 Section 63.7090 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants Emission...

  2. 40 CFR 63.775 - Reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... documentation stating why the TEG dehydration unit must operate using the alternate glycol circulation rate. (iv... facility will always operate the glycol dehydration unit using the optimum circulation rate determined in... dehydration unit located at an area source that meets the criteria in § 63.764(e)(1)(i) or § 63.764(e)(1)(ii...

  3. The Emerging Information Infrastructure: Players, Issues, Technology, and Strategies. Proceedings of Part I of the Meeting of the Association of Research Libraries (123rd, Arlington, Virginia, October 20-22, 1993).

    ERIC Educational Resources Information Center

    Mogge, Dru, Ed.; And Others

    The topic of the 123rd meeting of the Association of Research Libraries (ARL) is the information infrastructure. The ARL is seeking to influence the policies that will form the backbone of the emerging information infrastructure. The first session concentrated on government roles and initiatives and included the following papers: "Opening…

  4. Building effective R&D capabilities abroad.

    PubMed

    Kuemmerle, W

    1997-01-01

    In the past, companies kept most of their research and development activities in their home country because they thought it important to have R&D close to where strategic decisions were being made. But today many companies choose to establish R&D networks in foreign countries in order to tap the knowledge there or to commercialize products for those markets at a competitive speed. Adopting a global approach entails new, complex managerial challenges. It means linking R&D strategy to a company's overall business strategy. The first step in adopting such an approach is to build a team to lead the initiative--a team whose members are sufficiently senior to be able to mobilize resources at short notice. Second, companies must determine whether an R&D site's primary objective is to augment the expertise that the home base has the offer or to exploit that knowledge for use in the foreign country. That determination affects the choice of location and staff. For example, to augment the home base laboratory, a company would want to be near a foreign university; to exploit the home base laboratory it would need to be near large markets and manufacturing facilities. The best individual for managing both types of site combines the qualities of good scientist and good manager, knows how to integrate the new site with existing sites, understand technology trends, and is good at gaining access to foreign scientific communities. As more pockets of knowledge emerge around the globe and competition in foreign markets mounts, only those companies that embrace an informed approach to global R&D will be able to meet the new challenges.

  5. 40 CFR 63.986 - Nonflare control devices used for equipment leaks only.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment leaks only. 63.986 Section 63.986 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... leaks only. (a) Equipment and operating requirements. (1) Owners or operators using a nonflare control device to meet the applicable requirements of a referencing subpart for equipment leaks shall meet the...

  6. Early markers of retinal degeneration in rd/rd mice.

    PubMed

    Acosta, Monica L; Fletcher, Erica L; Azizoglu, Serap; Foster, Lisa E; Farber, Debora B; Kalloniatis, Michael

    2005-09-06

    In the rd/rd mouse, the cell death of rod photoreceptors has been correlated to abnormal levels of the cyclic nucleotide cGMP within photoreceptors. Given that cGMP is required for opening of the cationic channels, there is the possibility that a high cGMP concentration would maintain these channels open, at a high energy cost for the retina. We investigated whether cation channels were maintained in an open state in the rd/rd mouse retina by determining the labeling pattern of an organic cationic probe (agmatine, AGB) which selectively enters cells through open cationic channels. The metabolic activity of the rd/rd mice was measured by assaying lactate dehydrogenase (LDH) activity in several tissues and Na+/K+ ATPase activity was measured as a function of development and degeneration of the retina. AGB neuronal labeling showed a systematic increase consistent with the known neuronal functional maturation in the normal retina. There was a significant higher AGB labeling of photoreceptors in the rd/rd mouse retina from P6 supporting the possibility of open cationic channels from an early age. There were no changes in the LDH activity of tissues that contain PDE6 or that have a similar LDH distribution as the retina. However, LDH activity was significantly higher in the rd/rd mouse retina than in those of control mice from birth to P6, and it dramatically decreased from P9 as the photoreceptors degenerated. The predominant LDH isoenzyme changes and loss after degeneration appeared to be LDH5. ATPase activity increased with age, reaching adult levels by P16. Unlike LDH activity, there was no significant difference in Na+/K+ ATPase activity between control and rd/rd mice at any age examined. We conclude that AGB is a useful marker of photoreceptors destined to degenerate. We discard the possibility of a generalized metabolic effect in the rd/rd mice. However, the elevated LDH activity present before photoreceptor differentiation indicated altered retinal metabolic

  7. 45 CFR 63.17 - Amount of award.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... award. Federal assistance shall be provided only to meet allowable costs incurred by the award recipient... 45 Public Welfare 1 2011-10-01 2011-10-01 false Amount of award. 63.17 Section 63.17 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION GRANT PROGRAMS ADMINISTERED BY THE...

  8. 45 CFR 63.17 - Amount of award.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... award. Federal assistance shall be provided only to meet allowable costs incurred by the award recipient... 45 Public Welfare 1 2013-10-01 2013-10-01 false Amount of award. 63.17 Section 63.17 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION GRANT PROGRAMS ADMINISTERED BY THE...

  9. 45 CFR 63.17 - Amount of award.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... award. Federal assistance shall be provided only to meet allowable costs incurred by the award recipient... 45 Public Welfare 1 2014-10-01 2014-10-01 false Amount of award. 63.17 Section 63.17 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION GRANT PROGRAMS ADMINISTERED BY THE...

  10. 45 CFR 63.17 - Amount of award.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... award. Federal assistance shall be provided only to meet allowable costs incurred by the award recipient... 45 Public Welfare 1 2012-10-01 2012-10-01 false Amount of award. 63.17 Section 63.17 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION GRANT PROGRAMS ADMINISTERED BY THE...

  11. 40 CFR 63.2840 - What emission requirements must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... entire calendar month in which the source operated under an initial startup period subject to § 63.2850(c... operating months, as determined in § 63.2853. Oilseed = Tons of each oilseed type “i” processed during the... Loss Factors for Determining Allowable HAP Loss Type of oilseed process A source that... Oilseed...

  12. 40 CFR 63.2840 - What emission requirements must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... entire calendar month in which the source operated under an initial startup period subject to § 63.2850(c... operating months, as determined in § 63.2853. Oilseed = Tons of each oilseed type “i” processed during the... Loss Factors for Determining Allowable HAP Loss Type of oilseed process A source that... Oilseed...

  13. 40 CFR 63.2840 - What emission requirements must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... entire calendar month in which the source operated under an initial startup period subject to § 63.2850(c... operating months, as determined in § 63.2853. Oilseed = Tons of each oilseed type “i” processed during the... Loss Factors for Determining Allowable HAP Loss Type of oilseed process A source that... Oilseed...

  14. 40 CFR 63.7928 - How do I demonstrate continuous compliance with the emissions limitations and work practice...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... carbon adsorption systems in § 63.7925(h)(1) by meeting the requirements in paragraphs (e)(1) through (3... adsorption systems in § 63.7925(h)(2) by meeting the requirements in paragraphs (f)(1) through (3) of this... adsorption systems in § 63.7925(h)(3) by meeting the requirements in paragraphs (g)(1) through (3) of this...

  15. 40 CFR 63.7928 - How do I demonstrate continuous compliance with the emissions limitations and work practice...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... carbon adsorption systems in § 63.7925(h)(1) by meeting the requirements in paragraphs (e)(1) through (3... adsorption systems in § 63.7925(h)(2) by meeting the requirements in paragraphs (f)(1) through (3) of this... adsorption systems in § 63.7925(h)(3) by meeting the requirements in paragraphs (g)(1) through (3) of this...

  16. 40 CFR 63.643 - Miscellaneous process vent provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants From Petroleum Refineries § 63.643... section. (1) Reduce emissions of organic HAP's using a flare that meets the requirements of § 63.11(b) of...

  17. 3rd Karl Schwarzschild Meeting - Gravity and the Gauge/Gravity Correspondence

    NASA Astrophysics Data System (ADS)

    Nicolini, Piero; Kaminski, Matthias; Mureika, Jonas; Bleicher, Marcus

    2018-01-01

    The Karl Schwarzschild Meeting 2017 (KSM2017) has been the third instalment of the conference dedicated to the great Frankfurter scientist, who derived the first black hole solution of Einstein's equations about 100 years ago. The event has been a 5 day meeting in the field of black holes, AdS/CFT correspondence and gravitational physics. Like the two previous instalments, the conference continued to attract a stellar ensemble of participants from the world's most renowned institutions. The core of the meeting has been a series of invited talks from eminent experts (keynote speakers) as well as the presence of plenary research talks by students and junior speakers.

  18. 40 CFR 63.2981 - Does this subpart apply to me?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Does this subpart apply to me? 63.2981 Section 63.2981 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Subpart Covers § 63.2981 Does this subpart apply to me? You must comply with this subpart if you meet the...

  19. 40 CFR 63.2981 - Does this subpart apply to me?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Does this subpart apply to me? 63.2981 Section 63.2981 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Subpart Covers § 63.2981 Does this subpart apply to me? You must comply with this subpart if you meet the...

  20. 40 CFR 63.5683 - Does this subpart apply to me?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Does this subpart apply to me? 63.5683 Section 63.5683 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... § 63.5683 Does this subpart apply to me? (a) This subpart applies to you if you meet both of the...

  1. 40 CFR 63.2231 - Does this subpart apply to me?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Does this subpart apply to me? 63.2231 Section 63.2231 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Subpart Covers § 63.2231 Does this subpart apply to me? This subpart applies to you if you meet the...

  2. 40 CFR 63.2231 - Does this subpart apply to me?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Does this subpart apply to me? 63.2231 Section 63.2231 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Subpart Covers § 63.2231 Does this subpart apply to me? This subpart applies to you if you meet the...

  3. 40 CFR 63.5683 - Does this subpart apply to me?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Does this subpart apply to me? 63.5683 Section 63.5683 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... § 63.5683 Does this subpart apply to me? (a) This subpart applies to you if you meet both of the...

  4. 40 CFR 63.2981 - Does this subpart apply to me?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Does this subpart apply to me? 63.2981 Section 63.2981 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... § 63.2981 Does this subpart apply to me? You must comply with this subpart if you meet the criteria in...

  5. TMS 2014 143rd Annual Meeting & Exhibition, Annual Meeting Supplemental Proceedings (ISBN: 978-1-118-88972-5)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nielsen, K; Zhukov, A; Ipatov, M

    The Magnetic Materials for Energy Applications IV, held at the 2014, 143rd Annual Meeting of The Minerals, Metals, and Materials Society (TMS), brought together experts, young investigators, and students from this sub-discipline of materials science in order for them to share their latest discoveries and develop collaborations. This symposium, which is organized by The Minerals, Metals, and Materials Society, is an important event for this community of scientists. This year, over 50 high-level technical talks were planned over the course of the event. In addition, the students and young investigators in attendance ensured the maximum benefit to the next generation’smore » work force in this area of study. Meeting global energy needs in a clean, efficient, secure and sustainable manner is arguably the greatest challenge facing mankind today. Magnetic materials play a critical role in myriad devices for the collection, conversion, transmission and storage of energy. For example, high performance permanent magnets are currently in great demand for the generators in wind turbines and electric motors in hybrid vehicles. Other classes of advanced magnetic materials are essential for efficient inductors/transformers and motors. Energy efficient cooling based on the magnetocaloric effect is another exciting possibility which is rapidly becoming industrially viable. The potential energy savings related to refrigeration and air conditioning based on magnetocaloric materials are highly attractive. This symposium allowed experts in areas relating to the advanced characterization, simulation, and optimization of magnetic materials to convene and present their latest research. The types of interactions afforded by this event are beneficial to society at large primarily because they provide opportunities for the leaders within this field to learn from one another and thus improve the quality and productivity of their investigations. Additionally, the presence of young

  6. Solubility Testing of Sucrose Esters of Fatty Acids in International Food Additive Specifications.

    PubMed

    Nagai, Yukino; Kawano, Satoko; Motoda, Kenichiro; Tomida, Masaaki; Tatebe, Chiye; Sato, Kyoko; Akiyama, Hiroshi

    2017-03-01

    We investigated the solubility of 10 samples of sucrose esters of fatty acids (SEFA) products that are commercially available worldwide as food additives (emulsifiers). Although one sample dissolved transparently in both water and ethanol, other samples produced white turbidity and/or precipitates and did not meet the solubility criterion established by the Joint Food and Agriculture Organization of the United Nations (FAO)/WHO Expert Committee on Food Additives (JECFA). When the sample solutions were heated, the solubility in both water and ethanol increased. All of the samples dissolved transparently in ethanol, and dispersed and became white without producing precipitates in water. The present study suggests that the current solubility criterion of the JECFA SEFA specifications needs to be revised.

  7. 75 FR 9429 - Notice of Public Meeting, Eastern Washington Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... (EWRAC) will meet as indicated below. DATES: Meeting will take place on March 25, 2010, from 10 a.m. to 2..., Washington 98837-2950. FOR FURTHER INFORMATION CONTACT: BLM Spokane District, 1103 N. Fancher Rd., Spokane... public. It will begin at 10 a.m. and end at 2 p.m. on March 25. Members of the public will have an...

  8. 75 FR 76494 - Sunshine Act Meeting; Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... LEGAL SERVICES CORPORATION Sunshine Act Meeting; Notice TIME AND DATE: The Legal Services Corporation Board of Directors' Operations & Regulations Committee (``Committee'') will meet telephonically on... Committee's agenda. LOCATION: Legal Services Corporation, F. William McCalpin Conference Center, 3rd Floor...

  9. 40 CFR 63.1085 - What are the general requirements for heat exchange systems?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...

  10. 40 CFR 63.1085 - What are the general requirements for heat exchange systems?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...

  11. 40 CFR 63.1085 - What are the general requirements for heat exchange systems?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...

  12. 40 CFR 63.1085 - What are the general requirements for heat exchange systems?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...

  13. 40 CFR 63.1569 - What are my requirements for HAP emissions from bypass lines?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my requirements for HAP emissions from bypass lines? 63.1569 Section 63.1569 Protection of Environment ENVIRONMENTAL PROTECTION... HAP emissions from bypass lines? (a) What work practice standards must I meet? (1) You must meet each...

  14. USRD type F63 transducer

    NASA Astrophysics Data System (ADS)

    Jevnager, M. D.; Tims, A. C.

    1981-11-01

    A small reversible audio frequency range transducer was developed. The type F63 transducer is designed to meet the specific needs of the user. It is sensitive and stable with temperature and moderate hydrostatic pressures as required by Naval Mine Engineering Facility to improve their mission capability.

  15. 75 FR 29972 - Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... ARCTIC RESEARCH COMMISSION Notice of Meeting May 10, 2010. Notice is hereby given that the U.S. Arctic Research Commission will hold its 93rd meeting in Washington, DC, on June 2-3, 2010. The business... staff reports. (4) Discussion and presentations concerning Arctic research activities. The focus of the...

  16. 40 CFR 63.4961 - How do I demonstrate initial compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants: Surface Coating of Metal Furniture Compliance... meet the operating limits and work practice standards required in §§ 63.4892 and 63.4893, respectively...

  17. Monitoring and verification R&D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pilat, Joseph F; Budlong - Sylvester, Kory W; Fearey, Bryan L

    2011-01-01

    The 2010 Nuclear Posture Review (NPR) report outlined the Administration's approach to promoting the agenda put forward by President Obama in Prague on April 5, 2009. The NPR calls for a national monitoring and verification R&D program to meet future challenges arising from the Administration's nonproliferation, arms control and disarmament agenda. Verification of a follow-on to New START could have to address warheads and possibly components along with delivery capabilities. Deeper cuts and disarmament would need to address all of these elements along with nuclear weapon testing, nuclear material and weapon production facilities, virtual capabilities from old weapon and existingmore » energy programs and undeclared capabilities. We only know how to address some elements of these challenges today, and the requirements may be more rigorous in the context of deeper cuts as well as disarmament. Moreover, there is a critical need for multiple options to sensitive problems and to address other challenges. There will be other verification challenges in a world of deeper cuts and disarmament, some of which we are already facing. At some point, if the reductions process is progressing, uncertainties about past nuclear materials and weapons production will have to be addressed. IAEA safeguards will need to continue to evolve to meet current and future challenges, and to take advantage of new technologies and approaches. Transparency/verification of nuclear and dual-use exports will also have to be addressed, and there will be a need to make nonproliferation measures more watertight and transparent. In this context, and recognizing we will face all of these challenges even if disarmament is not achieved, this paper will explore possible agreements and arrangements; verification challenges; gaps in monitoring and verification technologies and approaches; and the R&D required to address these gaps and other monitoring and verification challenges.« less

  18. 3rd annual symposium of chemical and pharmaceutical structure analysis.

    PubMed

    Weng, Naidong; Zheng, Jenny; Lee, Mike

    2012-08-01

    The 3rd Annual Symposium on Chemical and Pharmaceutical Structure Analysis was once again held in Shanghai, where a rich history of 'East meets West' continued. This meeting is dedicated to bringing together scientists from pharmaceutical companies, academic institutes, CROs and instrument vendors to discuss current challenges and opportunities on the forefront of pharmaceutical research and development. The diversified symposia and roundtables are highly interactive events where scientists share their experiences and visions in a collegial setting. The symposium highlighted speakers and sessions that provided first-hand experiences as well as the latest guidance and industrial/regulatory thinking, which was reflected by the theme of this year's meeting 'From Bench to Decision Making - from Basics to Application.' In addition to the highly successful Young Scientist Excellence Award, new events were featured at this year's meeting, such as the Executive Roundtable and the inaugural Innovator Award.

  19. 40 CFR 63.1100 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... suspension containing acrylonitrile. c Heat exchange systems as defined in § 63.1103(e)(2). d Fiber spinning... those process units that meet the criteria of paragraph (e)(8)(i) of this section. (f) Recovery operation equipment ownership determination. To determine the process unit to which recovery equipment shall...

  20. 40 CFR 63.1100 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... suspension containing acrylonitrile. c Heat exchange systems as defined in § 63.1103(e)(2). d Fiber spinning... those process units that meet the criteria of paragraph (e)(8)(i) of this section. (f) Recovery operation equipment ownership determination. To determine the process unit to which recovery equipment shall...

  1. 40 CFR 63.1100 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... suspension containing acrylonitrile. c Heat exchange systems as defined in § 63.1103(e)(2). d Fiber spinning... those process units that meet the criteria of paragraph (e)(8)(i) of this section. (f) Recovery operation equipment ownership determination. To determine the process unit to which recovery equipment shall...

  2. 76 FR 42760 - SBA Council on Underserved Communities Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... SMALL BUSINESS ADMINISTRATION SBA Council on Underserved Communities Meeting AGENCY: U.S. Small Business Administration (SBA). ACTION: Notice of Federal advisory committee meeting. SUMMARY: The SBA is... meeting will be held at the U.S. Small Business Administration: 409 3rd St SW., Eisenhower Conference Room...

  3. 40 CFR 63.4961 - How do I demonstrate initial compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Surface Coating of Metal Furniture... operation must meet the operating limits and work practice standards required in §§ 63.4892 and 63.4893...

  4. The ENCCA-WP7/EuroSarc/EEC/PROVABES/EURAMOS 3rd European Bone Sarcoma Networking Meeting/Joint Workshop of EU Bone Sarcoma Translational Research Networks; Vienna, Austria, September 24-25, 2015. Workshop Report.

    PubMed

    Kager, Leo; Whelan, Jeremy; Dirksen, Uta; Hassan, Bass; Anninga, Jakob; Bennister, Lindsey; Bovée, Judith V M G; Brennan, Bernadette; Broto, Javier M; Brugières, Laurence; Cleton-Jansen, Anne-Marie; Copland, Christopher; Dutour, Aurélie; Fagioli, Franca; Ferrari, Stefano; Fiocco, Marta; Fleuren, Emmy; Gaspar, Nathalie; Gelderblom, Hans; Gerrand, Craig; Gerß, Joachim; Gonzato, Ornella; van der Graaf, Winette; Hecker-Nolting, Stefanie; Herrero-Martín, David; Klco-Brosius, Stephanie; Kovar, Heinrich; Ladenstein, Ruth; Lancia, Carlo; LeDeley, Marie-Cecile; McCabe, Martin G; Metzler, Markus; Myklebost, Ola; Nathrath, Michaela; Picci, Piero; Potratz, Jenny; Redini, Françoise; Richter, Günther H S; Reinke, Denise; Rutkowski, Piotr; Scotlandi, Katia; Strauss, Sandra; Thomas, David; Tirado, Oscar M; Tirode, Franck; Vassal, Gilles; Bielack, Stefan S

    2016-01-01

    This report summarizes the results of the 3rd Joint ENCCA-WP7, EuroSarc, EEC, PROVABES, and EURAMOS European Bone Sarcoma Network Meeting, which was held at the Children's Cancer Research Institute in Vienna, Austria on September 24-25, 2015. The joint bone sarcoma network meetings bring together European bone sarcoma researchers to present and discuss current knowledge on bone sarcoma biology, genetics, immunology, as well as results from preclinical investigations and clinical trials, to generate novel hypotheses for collaborative biological and clinical investigations. The ultimate goal is to further improve therapy and outcome in patients with bone sarcomas.

  5. 40 CFR 63.7830 - What are my monitoring requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) of this section. (1) Install, operate, and maintain a bag leak detection system according to § 63... § 63.7832; or (2) If you do not install and operate a bag leak detection system, you must install... bag leak detection system and COMS are not required for a baghouse that meets the requirements in...

  6. 77 FR 32169 - SJI Board of Directors Meeting, Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ... meeting is to consider grant applications for the 3rd quarter of FY 2012, and other business. All portions of this meeting are open to the public. ADDRESSES: Westin Hotel, 1900 5th Ave., Seattle, WA 98101...

  7. Multiple R&D projects scheduling optimization with improved particle swarm algorithm.

    PubMed

    Liu, Mengqi; Shan, Miyuan; Wu, Juan

    2014-01-01

    For most enterprises, in order to win the initiative in the fierce competition of market, a key step is to improve their R&D ability to meet the various demands of customers more timely and less costly. This paper discusses the features of multiple R&D environments in large make-to-order enterprises under constrained human resource and budget, and puts forward a multi-project scheduling model during a certain period. Furthermore, we make some improvements to existed particle swarm algorithm and apply the one developed here to the resource-constrained multi-project scheduling model for a simulation experiment. Simultaneously, the feasibility of model and the validity of algorithm are proved in the experiment.

  8. 40 CFR 63.2231 - Does this subpart apply to me?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Does this subpart apply to me? 63.2231 Section 63.2231 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS....2231 Does this subpart apply to me? This subpart applies to you if you meet the criteria in paragraphs...

  9. Collaborative Product Development in an R&D Environment

    NASA Technical Reports Server (NTRS)

    Davis, Jose M.; Keys, L. Ken; Chen, Injazz J.; Peterson, Paul L.

    2004-01-01

    Research and development (R&D) organizations are being required to be relevant, to be more application-oriented, and to be partners in the strategic management of the business while meeting the same challenges as the rest of the organization, namely: (1) reduced time to market; (2) reduced cost; (3) improved quality; (4) increased reliability; and (5) increased focus on customer needs. Recent advances in computer technology and the Internet have created a new paradigm of collaborative engineering or collaborative product development (CPD), from which new types of relationships among researchers and their partners have emerged. Research into the applicability and benefits of CPD in a low/no production, R&D, and/or government environment is limited. In addition, the supply chain management (SCM) aspects of these relationships have not been studied. This paper presents research conducted at the NASA Glenn Research Center (GRC) investigating the applicability of CPD and SCM in an R&D organization. The study concentrates on the management and implementation of space research activities at GRC. Results indicate that although the organization is engaged in collaborative relationships that incorporate aspects of SCM, a number of areas, such as development of trust and information sharing merit special attention.

  10. 40 CFR 63.5787 - What if I also manufacture fiberglass boats or boat parts?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... boats or boat parts? 63.5787 Section 63.5787 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Composites Production What This Subpart Covers § 63.5787 What if I also manufacture fiberglass boats or boat parts? (a) If your source meets the applicability criteria in § 63.5785, and is not subject to the Boat...

  11. 40 CFR 63.5787 - What if I also manufacture fiberglass boats or boat parts?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... boats or boat parts? 63.5787 Section 63.5787 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Production What This Subpart Covers § 63.5787 What if I also manufacture fiberglass boats or boat parts? (a) If your source meets the applicability criteria in § 63.5785, and is not subject to the Boat...

  12. 40 CFR 63.5787 - What if I also manufacture fiberglass boats or boat parts?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... boats or boat parts? 63.5787 Section 63.5787 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Composites Production What This Subpart Covers § 63.5787 What if I also manufacture fiberglass boats or boat parts? (a) If your source meets the applicability criteria in § 63.5785, and is not subject to the Boat...

  13. 40 CFR 63.5787 - What if I also manufacture fiberglass boats or boat parts?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... boats or boat parts? 63.5787 Section 63.5787 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Composites Production What This Subpart Covers § 63.5787 What if I also manufacture fiberglass boats or boat parts? (a) If your source meets the applicability criteria in § 63.5785, and is not subject to the Boat...

  14. 40 CFR 63.10031 - What reports must I submit and when?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Unless the Administrator has approved a different schedule for submission of reports under § 63.10(a...FIRE database by using the Compliance and Emissions Data Reporting Interface (CEDRI) that is accessed...FIRE Administrator, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same ERT file with the CBI...

  15. 40 CFR 63.10031 - What reports must I submit and when?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Unless the Administrator has approved a different schedule for submission of reports under § 63.10(a...FIRE database by using the Compliance and Emissions Data Reporting Interface (CEDRI) that is accessed...FIRE Administrator, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same ERT file with the CBI...

  16. 40 CFR 63.10031 - What reports must I submit and when?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Unless the Administrator has approved a different schedule for submission of reports under § 63.10(a...FIRE database by using the Compliance and Emissions Data Reporting Interface (CEDRI) that is accessed...FIRE Administrator, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same ERT file with the CBI...

  17. 40 CFR 63.9590 - What emission limitations must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) For each dry electrostatic precipitator applied to meet any particulate matter emission limit in Table... voltage and daily average secondary current for each field at or above the minimum levels established during the initial performance test. (4) For each wet electrostatic precipitator applied to meet any...

  18. 40 CFR 63.9590 - What emission limitations must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) For each dry electrostatic precipitator applied to meet any particulate matter emission limit in Table... voltage and daily average secondary current for each field at or above the minimum levels established during the initial performance test. (4) For each wet electrostatic precipitator applied to meet any...

  19. 40 CFR 63.5683 - Does this subpart apply to me?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Does this subpart apply to me? 63.5683 Section 63.5683 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... subpart apply to me? (a) This subpart applies to you if you meet both of the criteria listed in paragraphs...

  20. 40 CFR 63.822 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the MSDS meets the data requirements of § 63.827(b) and (c). The purpose of the CPDS is to assist the... weight-fraction, kg/kg. (4) Chij=the organic HAP content of solvent j, added to solids-containing material i, expressed as a weight-fraction, kg/kg. (5) Chj=the organic HAP content of solvent j, expressed...

  1. 40 CFR 63.11561 - What are my standards and management practices?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... standards and management practices? (a) For asphalt processing operations, you must meet the emission limits... 40 Protection of Environment 14 2010-07-01 2010-07-01 false What are my standards and management practices? 63.11561 Section 63.11561 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED...

  2. 40 CFR 63.9590 - What emission limitations must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Except as provided in paragraph (b)(2) of this section, for each wet scrubber applied to meet any... drop and daily average scrubber water flow rate at or above the minimum levels established during the initial performance test. (2) For each dynamic wet scrubber applied to meet any particulate matter...

  3. 40 CFR 63.9590 - What emission limitations must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Except as provided in paragraph (b)(2) of this section, for each wet scrubber applied to meet any... drop and daily average scrubber water flow rate at or above the minimum levels established during the initial performance test. (2) For each dynamic wet scrubber applied to meet any particulate matter...

  4. 40 CFR 63.9590 - What emission limitations must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Except as provided in paragraph (b)(2) of this section, for each wet scrubber applied to meet any... drop and daily average scrubber water flow rate at or above the minimum levels established during the initial performance test. (2) For each dynamic wet scrubber applied to meet any particulate matter...

  5. 40 CFR 63.7740 - What are my monitoring requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... positive pressure baghouse equipped with a stack that is applied to meet any PM or total metal HAP..., regardless of type, that is applied to meet any PM or total metal HAP emissions limitation in this subpart... detectors, or equivalent means. (d) For each wet scrubber subject to the operating limits in § 63.7690(b)(2...

  6. 40 CFR 63.7740 - What are my monitoring requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... pressure baghouse equipped with a stack that is applied to meet any PM or total metal HAP emissions..., that is applied to meet any PM or total metal HAP emissions limitation in this subpart, you must... detectors, or equivalent means. (d) For each wet scrubber subject to the operating limits in § 63.7690(b)(2...

  7. 40 CFR 63.7740 - What are my monitoring requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... positive pressure baghouse equipped with a stack that is applied to meet any PM or total metal HAP..., regardless of type, that is applied to meet any PM or total metal HAP emissions limitation in this subpart... detectors, or equivalent means. (d) For each wet scrubber subject to the operating limits in § 63.7690(b)(2...

  8. 40 CFR 63.8105 - What definitions apply to this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... permit for any affected source required to obtain such a permit; or (3) Fails to meet any emission limit... (incorporated by reference as specified in § 63.14 of subpart A of this part 63); or (2) As obtained from... monomethyl ether acetate 110496 11. Isophorone 78591 12. Methanol 67561 13. Nitrobenzene 98953 14. Toluidine...

  9. The Third International Genomic Medicine Conference (3rd IGMC, 2015): overall activities and outcome highlights.

    PubMed

    Abu-Elmagd, Muhammad; Assidi, Mourad; Dallol, Ashraf; Buhmeida, Abdelbaset; Pushparaj, Peter Natesan; Kalamegam, Gauthaman; Al-Hamzi, Emad; Shay, Jerry W; Scherer, Stephen W; Agarwal, Ashok; Budowle, Bruce; Gari, Mamdooh; Chaudhary, Adeel; Abuzenadah, Adel; Al-Qahtani, Mohammed

    2016-10-17

    The Third International Genomic Medicine Conference (3 rd IGMC) was organised by the Centre of Excellence in Genomic Medicine Research (CEGMR) at the King Abdulaziz University, Jeddah, Kingdom of Saudi Arabia (KSA). This conference is a continuation of a series of meetings, which began with the first International Genomic Medicine Conference (1 st IGMC, 2011) followed by the second International Genomic Medicine Conference (2 nd IGMC, 2013). The 3 rd IGMC meeting presented as a timely opportunity to bring scientists from across the world to gather, discuss, and exchange recent advances in the field of genomics and genetics in general as well as practical information on using these new technologies in different basic and clinical applications. The meeting undoubtedly inspired young male and female Saudi researchers, who attended the conference in large numbers, as evidenced by the oversubscribed oral and poster presentations. The conference also witnessed the launch of the first content for npj Genomic Medicine, a high quality new journal was established in partnership by CEGMR with Springer Nature and published as part of the Nature Partner Journal series. Here, we present a brief summary report of the 2-day meeting including highlights from the oral presentations, poster presentations, workshops, poster prize-winners and comments from the distinguished scientists.

  10. 40 CFR 63.4690 - What emission limits must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... source, you must limit organic HAP emissions to the atmosphere to no more than the applicable emission... 63.4761. (b) For an existing affected source, you must limit organic HAP emissions to the atmosphere...

  11. 40 CFR 63.774 - Recordkeeping requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... dehydration unit baseline operations calculated as required under § 63.771(e)(1). (11) Records required in... this section. (d)(1) An owner or operator of a glycol dehydration unit that meets the exemption...)(i) or paragraph (d)(1)(ii) of this section, as appropriate, for that glycol dehydration unit. (i...

  12. 40 CFR 63.774 - Recordkeeping requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... dehydration unit baseline operations calculated as required under § 63.771(e)(1). (11) Records required in... this section. (d)(1) An owner or operator of a glycol dehydration unit that meets the exemption...)(i) or paragraph (d)(1)(ii) of this section, as appropriate, for that glycol dehydration unit. (i...

  13. 40 CFR 63.774 - Recordkeeping requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... dehydration unit baseline operations calculated as required under § 63.771(e)(1). (11) Records required in... this section. (d)(1) An owner or operator of a glycol dehydration unit that meets the exemption...)(i) or paragraph (d)(1)(ii) of this section, as appropriate, for that glycol dehydration unit. (i...

  14. 75 FR 27367 - Sunshine Act Meeting of the Board of Directors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... LEGAL SERVICES CORPORATION Sunshine Act Meeting of the Board of Directors Time and Date: The Board of Directors of the Legal Services Corporation will meet telephonically on May 19, 2010. The meeting...: Legal Services Corporation, 3333 K Street, NW., Washington, DC 20007, 3rd Floor Conference Center...

  15. 40 CFR 63.7746 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... periods of startup, shutdown, and malfunction. You also must report each instance in which you did not... according to the requirements of § 63.7751. (b) Startups, shutdowns, and malfunctions. (1) Consistent with the requirements of §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup...

  16. 40 CFR 63.7746 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... periods of startup, shutdown, and malfunction. You also must report each instance in which you did not... according to the requirements of § 63.7751. (b) Startups, shutdowns, and malfunctions. (1) Consistent with the requirements of §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup...

  17. 40 CFR 63.7746 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... periods of startup, shutdown, and malfunction. You also must report each instance in which you did not... according to the requirements of § 63.7751. (b) Startups, shutdowns, and malfunctions. (1) Consistent with the requirements of §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup...

  18. 40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...

  19. 40 CFR 63.7336 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... periods of startup, shutdown, and malfunction. You must also report each instance in which you did not... must be reported according to the requirements in § 63.7341. (b) Startup, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup...

  20. 40 CFR 63.7336 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... periods of startup, shutdown, and malfunction. You must also report each instance in which you did not... must be reported according to the requirements in § 63.7341. (b) Startup, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup...

  1. 40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...

  2. 40 CFR 63.7746 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... periods of startup, shutdown, and malfunction. You also must report each instance in which you did not... according to the requirements of § 63.7751. (b) Startups, shutdowns, and malfunctions. (1) Consistent with the requirements of §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup...

  3. 40 CFR 63.7336 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... periods of startup, shutdown, and malfunction. You must also report each instance in which you did not... must be reported according to the requirements in § 63.7341. (b) Startup, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup...

  4. 40 CFR 63.7746 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... periods of startup, shutdown, and malfunction. You also must report each instance in which you did not... according to the requirements of § 63.7751. (b) Startups, shutdowns, and malfunctions. (1) Consistent with the requirements of §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup...

  5. 40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...

  6. 40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...

  7. 40 CFR 63.7336 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... periods of startup, shutdown, and malfunction. You must also report each instance in which you did not... must be reported according to the requirements in § 63.7341. (b) Startup, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup...

  8. 40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...

  9. 40 CFR 63.7336 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... periods of startup, shutdown, and malfunction. You must also report each instance in which you did not... must be reported according to the requirements in § 63.7341. (b) Startup, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup...

  10. 40 CFR 63.7550 - What reports must I submit and when?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... you. (b) Unless the EPA Administrator has approved a different schedule for submission of reports... this subpart and the compliance reports required in § 63.7550(b) to the EPA's WebFIRE database by using... Administrator, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same ERT file with the CBI omitted must be...

  11. 40 CFR 63.7550 - What reports must I submit and when?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... you. (b) Unless the EPA Administrator has approved a different schedule for submission of reports... this subpart and the compliance reports required in § 63.7550(b) to the EPA's WebFIRE database by using... Administrator, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same ERT file with the CBI omitted must be...

  12. Elements of a predictive model for determining beach closures on a real time basis: the case of 63rd Street Beach Chicago

    USGS Publications Warehouse

    Olyphant, Greg A.; Whitman, Richard L.

    2004-01-01

    Data on hydrometeorological conditions and E. coli concentration were simultaneously collected on 57 occasions during the summer of 2000 at 63rd Street Beach, Chicago, Illinois. The data were used to identify and calibrate a statistical regression model aimed at predicting when the bacterial concentration of the beach water was above or below the level considered safe for full body contact. A wide range of hydrological, meteorological, and water quality variables were evaluated as possible predictive variables. These included wind speed and direction, incoming solar radiation (insolation), various time frames of rainfall, air temperature, lake stage and wave height, and water temperature, specific conductance, dissolved oxygen, pH, and turbidity. The best-fit model combined real-time measurements of wind direction and speed (onshore component of resultant wind vector), rainfall, insolation, lake stage, water temperature and turbidity to predict the geometric mean E.coliconcentration in the swimming zone of the beach. The model, which contained both additive and multiplicative (interaction) terms, accounted for 71% of the observed variability in the log E. coliconcentrations. A comparison between model predictions of when the beach should be closed and when the actualbacterial concentrations were above or below the 235 cfu 100 ml-1 threshold value, indicated that the model accurately predicted openingsversus closures 88% of the time.

  13. 75 FR 54092 - North Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... 28th, 2010 at the Anchorage Hilton Hotel. DATES: The meeting will be held on September 28, 2010, from 9 a.m. to 5 p.m. ADDRESSES: The meeting will be held at the Anchorage Hilton Hotel, 500 West 3rd...

  14. Educational Activity for the Radiation Emergency System in the Northern Part of Japan: Meeting Report on "The 3rd Educational Symposium on Radiation and Health (ESRAH) by Young Scientists in 2016".

    PubMed

    Matsuya, Yusuke; Tsujiguchi, Takakiyo; Yamaguchi, Masaru; Kimura, Takaaki; Mori, Ryosuke; Yamada, Ryota; Saga, Ryo; Fujishima, Yohei; Date, Hiroyuki

    2017-06-01

    In the northern part of Japan, close cooperation is essential in preparing for any possible emergency response to radiation accidents because several facilities, such as the Low-Level Radioactive Waste Disposal Facility, the MOX Fuel Fabrication Plant and the Vitrified Waste Storage Center, exist in Rokkasho Village (Aomori Prefecture). After the accident at Fukushima Daiichi Nuclear Power Plant in 2011, special attention should be given to the relationship between radiation and human health, as well as establishing a system for managing with a radiation emergency. In the area of Hokkaido and Aomori prefectures in Japan, since 2008 an exchange meeting between Hokkaido University and Hirosaki University has been held every year to have opportunities to discuss radiation effects on human health and to collect the latest news on monitoring environmental radiation. This meeting was elevated to an international meeting in 2014 titled "Educational Symposium on Radiation and Health (ESRAH) by Young Scientists". The 3rd ESRAH meeting took place in 2016, with the theme "Investigating Radiation Impact on the Environmental and Health". Here we report the meeting findings on the continuing educational efforts after the Fukushima incident, what was accomplished in terms of building a community educational approaches, and future goals.

  15. 78 FR 16660 - North Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... meet in Anchorage, AK. DATES: The meeting will be held on April 1, 2013, from 3 p.m. to 8 p.m. ADDRESSES: The meeting will be held at the Anchorage Hilton Hotel, Dillingham/Katmai Room, 500 West 3rd Avenue, Anchorage, AK. Council address: North Pacific Fishery Management Council, 605 W. 4th Ave., Suite...

  16. 40 CFR 63.6010 - What reports must I submit and when?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....5984 and the compliance alternative in § 63.5985 that you have chosen to meet. (8) For each tire production affected source complying with the purchase compliance alternative in § 63.5985(a), and for each annual reporting period during which you use a cement and solvent that, as purchased, was not included in...

  17. 40 CFR 63.6010 - What reports must I submit and when?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....5984 and the compliance alternative in § 63.5985 that you have chosen to meet. (8) For each tire production affected source complying with the purchase compliance alternative in § 63.5985(a), and for each annual reporting period during which you use a cement and solvent that, as purchased, was not included in...

  18. 40 CFR 63.6009 - What notifications must I submit and when?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission limit option in § 63.5984 and the compliance alternative in § 63.5985 that you have chosen to meet. (g) For each tire production affected source complying with the purchase compliance alternative in... paragraphs (g)(1) and (2) of this section. (1) A list of each cement and solvent, as purchased, that is used...

  19. 40 CFR 63.6009 - What notifications must I submit and when?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission limit option in § 63.5984 and the compliance alternative in § 63.5985 that you have chosen to meet. (g) For each tire production affected source complying with the purchase compliance alternative in... paragraphs (g)(1) and (2) of this section. (1) A list of each cement and solvent, as purchased, that is used...

  20. 40 CFR 63.4890 - What emission limits must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... organic HAP-free coating technology can be used on the metal furniture components. The request must be... Standards for Hazardous Air Pollutants: Surface Coating of Metal Furniture Emission Limitations § 63.4890... emission limit for specific metal furniture components or type of components for which you believe the...

  1. Conference report: reviving pharmaceutical R&D with translational science, regulatory efficiency and innovative models.

    PubMed

    Zhang, Tianyi Tee; Weng, Naidong; Lee, Mike

    2013-10-01

    The 4th Annual Shanghai Symposium on Clinical & Pharmaceutical Solutions through Analysis (CPSA Shanghai 2013) was held on 24-27 April 2013 in Shanghai, China. The meeting provided an educational forum for scientists from pharmaceutical industry, academia, CROs and instrument vendors to share experience and ideas, and discuss current challenges, issues and innovative solutions associated with pharmaceutical R&D. The meeting featured highly interactive events, including diversified symposia, roundtable discussions, workshops, poster sessions and conference awards. Education and specialized training are the foundation of CPSA events. The CPSA Shanghai 2013 meeting also featured an inaugural satellite workshop event in Beijing, as well as joint sessions traditionally held with local bioanalytical and drug metabolism discussion groups.

  2. 40 CFR 63.805 - Performance test methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... alternative method for determining the VHAP content of the coating. In the event of any inconsistency between... Collection of Coating and Ink Samples for VOC Content Analysis by Reference Method 24 and Reference Method... (see § 63.801); (iii) Use any alternative protocol and test method provided they meet either the...

  3. 40 CFR 63.1563 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... National Emission Standards for Hazardous Air Pollutants for Petroleum Refineries: Catalytic Cracking Units... for an existing catalytic cracking unit allowing additional time to meet the emission limitations and work practice standards for catalytic cracking units in §§ 63.1564 and 63.1565 if you commit to...

  4. 40 CFR 63.1563 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... National Emission Standards for Hazardous Air Pollutants for Petroleum Refineries: Catalytic Cracking Units... for an existing catalytic cracking unit allowing additional time to meet the emission limitations and work practice standards for catalytic cracking units in §§ 63.1564 and 63.1565 if you commit to...

  5. 78 FR 23951 - Notice of Public Meeting, Albuquerque District Resource Advisory Council Meeting, New Mexico

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... indicated below. DATES: The meeting date is May 21, 2013, at the BLM Albuquerque District Office, 435... Albuquerque District Office, 435 Montano Rd., Albuquerque, NM 87107, 505-761-8734. Persons who use a... New Mexico. Planned agenda items include presentations by the Socorro and Rio Puerco Field Office...

  6. 76 FR 72001 - Notice of Public Meeting, Albuquerque District Resource Advisory Council Meeting, New Mexico

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... the Socorro and Rio Puerco Field Office Managers. The comment period during which the public may... indicated below. DATES: The meeting date is December 13, 2011, at the BLM Albuquerque District Office, 435... District Office, 435 Montano Rd., Albuquerque, NM 87107, (505) 761-8935. Persons who use a...

  7. 76 FR 39076 - Western Hemisphere Institute for Security Cooperation Board of Visitors; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... Defense (Policy); Department of State; US Northern Command and US Southern Command meeting on December 3rd... DEPARTMENT OF DEFENSE Department of the Army Western Hemisphere Institute for Security Cooperation Board of Visitors; Meeting AGENCY: Department of the Army, DoD. ACTION: Notice of open meeting. SUMMARY...

  8. 40 CFR 63.2984 - What operating limits must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... limits or ranges specified in your operation, maintenance, and monitoring (OMM) plan described in § 63.2987. If there is a deviation of any of the specified parameters from the limit or range specified in...) You must not use a resin with a free-formaldehyde content greater than that of the resin used during...

  9. 40 CFR 63.2984 - What operating limits must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... limits or ranges specified in your operation, maintenance, and monitoring (OMM) plan described in § 63.2987. If there is a deviation of any of the specified parameters from the limit or range specified in...) You must not use a resin with a free-formaldehyde content greater than that of the resin used during...

  10. Building Solid Communities within Higher Education: Leadership, Connections and Commitment. Proceedings of the Annual Meeting of the Association for Continuing Higher Education (63rd, Vancouver, British Columbia, November 3-6, 2001).

    ERIC Educational Resources Information Center

    Barrineau, Irene T., Ed.

    These proceedings presents addresses, 60 concurrent sessions, and business meetings from a conference that evolved from a vision of people coming together--like a town meeting--to start building "communities of interest and practice." Part 1 includes the presidential-elect address on his theme for the next conference, "Pathways to…

  11. 77 FR 70807 - Notice of Public Meeting, Albuquerque District Resource Advisory Council Meeting, New Mexico

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... and Rio Puerco Field Office Managers. The comment period during which the public may address the RAC... indicated below. DATES: The meeting date is December 10, 2012, at the BLM Albuquerque District Office, 435... District Office, 435 Montano Rd., Albuquerque, NM 87107, 505-761-8734. Persons who use a telecommunications...

  12. 76 FR 51053 - Meeting of the California Desert District Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ..., from 8 a.m. to 5 p.m. at the Hampton Inn & Suites, 2710 Lenwood Rd., Barstow, CA 92311. There will be a.../info/rac/dac.html , when finalized. Agenda topics for the Saturday meeting will include recreation fees... meeting is tentatively scheduled from 8 a.m. to 5 p.m., the meeting could conclude prior to 5 p.m. should...

  13. 40 CFR 63.428 - Reporting and recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... change in parameter. (j) Each owner or operator of a facility meeting the criteria in § 63.420(d) shall perform the requirements of this paragraph (j), all of which will be available for public inspection: (1...); and (3) At any time following the notification required under paragraph (j)(1) of this section, and...

  14. 40 CFR 63.428 - Reporting and recordkeeping.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... change in parameter. (j) Each owner or operator of a facility meeting the criteria in § 63.420(d) shall perform the requirements of this paragraph (j), all of which will be available for public inspection: (1...); and (3) At any time following the notification required under paragraph (j)(1) of this section, and...

  15. 40 CFR 63.428 - Reporting and recordkeeping.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... change in parameter. (j) Each owner or operator of a facility meeting the criteria in § 63.420(d) shall perform the requirements of this paragraph (j), all of which will be available for public inspection: (1...); and (3) At any time following the notification required under paragraph (j)(1) of this section, and...

  16. 40 CFR 63.428 - Reporting and recordkeeping.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... change in parameter. (j) Each owner or operator of a facility meeting the criteria in § 63.420(d) shall perform the requirements of this paragraph (j), all of which will be available for public inspection: (1...); and (3) At any time following the notification required under paragraph (j)(1) of this section, and...

  17. 40 CFR 63.4541 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... required to meet the operating limits or work practice standards required in §§ 63.4492 and 63.4493...

  18. 40 CFR 63.4541 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants for Surface Coating... required to meet the operating limits or work practice standards required in §§ 63.4492 and 63.4493...

  19. 40 CFR 63.4331 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants... standards in §§ 63.4292 and 63.4293, respectively. You must meet all the requirements of paragraphs (a)(1...

  20. 40 CFR 63.4331 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants... standards in §§ 63.4292 and 63.4293, respectively. You must meet all the requirements of paragraphs (a)(1...

  1. 40 CFR 63.4551 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... required to meet the operating limits or work practice standards in §§ 63.4492 and 63.4493, respectively...

  2. 40 CFR 63.4331 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants... standards in §§ 63.4292 and 63.4293, respectively. You must meet all the requirements of paragraphs (a)(1...

  3. 40 CFR 63.4141 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants: Surface Coating of... to meet the operating limits or work practice standards required in §§ 63.4092 and 63.4093...

  4. 40 CFR 63.1178 - For cupolas, what standards must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Begin within one hour after the alarm on a bag leak detection system sounds, and complete in a timely... § 63.1187 of this subpart. (2) When the alarm on a bag leak detection system sounds for more than five...

  5. 75 FR 51103 - Notice of Public Meeting, Eastern Washington Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... will be open to the public. It will begin at 10 a.m. and end at 2 p.m. on September 16. Members of the public will have an opportunity to address the EWRAC at 10 a.m. The meeting will be held at The Potato..., 1103 N. Fancher Rd., Spokane Valley, WA 99212, or call (509) 536-1200. Robert B. Towne, Spokane...

  6. 40 CFR 63.104 - Heat exchange system requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry... subpart shall monitor each heat exchange system used to cool process equipment in a chemical manufacturing process unit meeting the conditions of § 63.100 (b)(1) through (b)(3) of this subpart, except for chemical...

  7. 40 CFR 63.104 - Heat exchange system requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry... subpart shall monitor each heat exchange system used to cool process equipment in a chemical manufacturing process unit meeting the conditions of § 63.100 (b)(1) through (b)(3) of this subpart, except for chemical...

  8. 40 CFR 63.104 - Heat exchange system requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry... subpart shall monitor each heat exchange system used to cool process equipment in a chemical manufacturing process unit meeting the conditions of § 63.100 (b)(1) through (b)(3) of this subpart, except for chemical...

  9. 40 CFR 63.4951 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants... limit in § 63.4890, but is not required to meet the operating limits or work practice standards in §§ 63...

  10. 40 CFR 63.4951 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants... limit in § 63.4890, but is not required to meet the operating limits or work practice standards in §§ 63...

  11. 40 CFR 63.4951 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants... limit in § 63.4890, but is not required to meet the operating limits or work practice standards in §§ 63...

  12. Naval War College Review. Volume 63, Number 3, Summer 2010

    DTIC Science & Technology

    2010-01-01

    3 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7... PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval War College,,686 Cushing Rd.,,Newport,,RI,02841 8. PERFORMING ORGANIZATION REPORT NUMBER 9...63 George V. Galdorisi and Scott C. Truver The Navy currently plans to build only three of the Zumwalt (DDG 1000) guided-missile destroyers. But the

  13. 40 CFR 63.5986 - What emission limits must I meet for tire cord production affected sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... tire cord production affected sources? 63.5986 Section 63.5986 Protection of Environment ENVIRONMENTAL... POLLUTANTS FOR SOURCE CATEGORIES National Emissions Standards for Hazardous Air Pollutants: Rubber Tire Manufacturing Emission Limits for Tire Cord Production Affected Sources § 63.5986 What emission limits must I...

  14. The 23rd Stirling Physics Meeting

    NASA Astrophysics Data System (ADS)

    1998-01-01

    derived from a standard Tesla coil with a high-Q secondary. This is capable of delivering around a million volts, which produce fantastic lightning flashes. A volunteer from the audience was invited to enter a huge Faraday Cage which was then subjected to these high voltage sparks! For a while the door of the cage jammed but eventually the victim emerged unscathed! This is, of course, not just an entertainment. The Gusto show is taken into schools and targeted at lower secondary pupils about to make their subject choices. The team also gives large scale physics demonstration lectures and could play to 10 000 children in a month. So physics is fun and physics is relevant to everyday life! Support for physics teachers Lesley Glasser chaired the afternoon session, which she opened by introducing the Institute's Education Officer. The Stirling Meeting would not be the same without the `commercial slot' presented again so ably by Catherine Wilson. Physics teachers are an endangered species and the Institute is determined to do whatever it can to support them. Plans are afoot to make sure the Schools Lectures are modified, if necessary, to take account of the educational differences in Scotland. The London-based `Physics in Perspective' course not only introduces sixth-formers to some of the frontiers of physics but gives enough free time for them to visit places of interest in the city - from the Science Museum to Soho. `So they associate physics with enjoyment!' Another Scottish Update Course is planned for teachers, and a brand new glossy booklet, sent free to all schools, will show pupils that choosing physics is a `Smart Move'. Finally the Institute has just started a major post-16 curriculum project which will include a variety of support materials to keep teachers abreast of continuing developments in physics. Each year, IoP Teacher of Physics Awards are given to `outstanding teachers of physics who inspire others to continue with and enjoy their physics'. Ann Jarvie

  15. 40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...

  16. 40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...

  17. 40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...

  18. 40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...

  19. 40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...

  20. 78 FR 13867 - North Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... Committee (SSLMC) will meet in Anchorage, AK. DATES: The meeting will be held on March 21-22, 2013, from 8 a... conference room, 100 W. 3rd Avenue, 1007, Anchorage, AK. Council address: North Pacific Fishery Management Council, 605 W. 4th Ave., Suite 306, Anchorage, AK 99501-2252. FOR FURTHER INFORMATION CONTACT: Steve...

  1. 78 FR 72929 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ... DEPARTMENT OF JUSTICE Parole Commission Sunshine Act Meeting TIME AND DATE: 12:00 p.m., Tuesday, December 10, 2013. PLACE: U.S. Parole Commission, 90 K Street NE., 3rd Floor, Washington, DC. STATUS: Closed. MATTERS TO BE CONSIDERED: Determination on four original jurisdiction cases. CONTACT PERSON FOR...

  2. 40 CFR 63.4951 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants: Surface Coating of... limit in § 63.4890, but is not required to meet the operating limits or work practice standards in §§ 63...

  3. 40 CFR 63.695 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... monitoring procedures required to perform the following: (1) To inspect tank fixed roofs and floating roofs... and floating roof inspection requirements. (1) Owners and operators that use a tank equipped with an internal floating roof in accordance with the provisions of § 63.685(e) of this subpart shall meet the...

  4. 14 CFR 63.19 - Operations during physical deficiency.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Operations during physical deficiency. 63... physical deficiency. No person may serve as a flight engineer or flight navigator during a period of known physical deficiency, or increase in physical deficiency, that would make him unable to meet the physical...

  5. 14 CFR 63.19 - Operations during physical deficiency.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Operations during physical deficiency. 63... physical deficiency. No person may serve as a flight engineer or flight navigator during a period of known physical deficiency, or increase in physical deficiency, that would make him unable to meet the physical...

  6. 14 CFR 63.19 - Operations during physical deficiency.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Operations during physical deficiency. 63... physical deficiency. No person may serve as a flight engineer or flight navigator during a period of known physical deficiency, or increase in physical deficiency, that would make him unable to meet the physical...

  7. 14 CFR 63.19 - Operations during physical deficiency.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Operations during physical deficiency. 63... physical deficiency. No person may serve as a flight engineer or flight navigator during a period of known physical deficiency, or increase in physical deficiency, that would make him unable to meet the physical...

  8. 14 CFR 63.19 - Operations during physical deficiency.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Operations during physical deficiency. 63... physical deficiency. No person may serve as a flight engineer or flight navigator during a period of known physical deficiency, or increase in physical deficiency, that would make him unable to meet the physical...

  9. 78 FR 72929 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ... DEPARTMENT OF JUSTICE Parole Commission Sunshine Act Meeting TIME AND DATE: 10:00 a.m., Tuesday, December 10, 2013. PLACE: U.S. Parole Commission, 90 K Street NE., 3rd Floor, Washington, DC. STATUS: Open. MATTERS TO BE CONSIDERED: Approval of August 8, 2013 minutes; reports from the Chairman, the Commissioners...

  10. 40 CFR 63.1581 - Does the subpart distinguish between different types of POTW treatment plants?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... different types of POTW treatment plants? 63.1581 Section 63.1581 Protection of Environment ENVIRONMENTAL... treatment plants? Yes, POTW treatment plants are divided into two subcategories. A POTW treatment plant which does not meet the characteristics of an industrial POTW treatment plant belongs in the non...

  11. 40 CFR 63.4161 - How do I demonstrate initial compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants: Surface Coating of Large Appliances Compliance... standards required in § 63.4093; and each controlled coating operation must meet the operating limits...

  12. 40 CFR 63.4161 - How do I demonstrate initial compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Surface Coating of Large Appliances... practice standards required in § 63.4093; and each controlled coating operation must meet the operating...

  13. 40 CFR 63.788 - Recordkeeping and reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... containers meet the standards as described in § 63.783(b)(2); and (vii) The results of any Method 24 of appendix A to 40 CFR part 60 or approved VOHAP measurement test conducted on individual containers of... summary of the number and total duration of incidents that the monitoring protocol failed to perform in...

  14. 76 FR 73737 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... Meeting) (Tentative) a. U.S. Department of Energy (High-Level Waste Repository), Docket No. 63-001-HLW; Staff Petition for the Commission to Exercise its Inherent Supervisory Authority to Review Board Orders...

  15. 40 CFR 63.7891 - How do I demonstrate initial compliance with the emissions limitations and work practice...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 63.7890(b)(2), you demonstrate that emissions of TOC (minus methane and ethane) from all affected... elect to meet § 63.7890(b)(4), you demonstrate that the emissions of TOC (minus methane and ethane) from...

  16. 25 CFR 63.5-63.9 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false [Reserved] 63.5-63.9 Section 63.5-63.9 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR TRIBAL GOVERNMENT INDIAN CHILD PROTECTION AND FAMILY VIOLENCE PREVENTION Purpose, Policy, and Definitions §§ 63.5-63.9 [Reserved] ...

  17. 40 CFR 63.103 - General compliance, reporting, and recordkeeping provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CATEGORIES National Emission Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry § 63.103 General compliance, reporting, and recordkeeping provisions. (a... media. (e) The owner or operator of a chemical manufacturing process unit which meets the criteria of...

  18. 40 CFR 63.103 - General compliance, reporting, and recordkeeping provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CATEGORIES National Emission Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry § 63.103 General compliance, reporting, and recordkeeping provisions. (a... media. (e) The owner or operator of a chemical manufacturing process unit which meets the criteria of...

  19. 40 CFR 63.103 - General compliance, reporting, and recordkeeping provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CATEGORIES National Emission Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry § 63.103 General compliance, reporting, and recordkeeping provisions. (a... media. (e) The owner or operator of a chemical manufacturing process unit which meets the criteria of...

  20. 40 CFR 63.103 - General compliance, reporting, and recordkeeping provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CATEGORIES National Emission Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry § 63.103 General compliance, reporting, and recordkeeping provisions. (a... media. (e) The owner or operator of a chemical manufacturing process unit which meets the criteria of...

  1. IBC’s 23rd Annual Antibody Engineering, 10th Annual Antibody Therapeutics International Conferences and the 2012 Annual Meeting of The Antibody Society

    PubMed Central

    Klöhn, Peter-Christian; Wuellner, Ulrich; Zizlsperger, Nora; Zhou, Yu; Tavares, Daniel; Berger, Sven; Zettlitz, Kirstin A.; Proetzel, Gabriele; Yong, May; Begent, Richard H.J.; Reichert, Janice M

    2013-01-01

    The 23rd Annual Antibody Engineering, 10th Annual Antibody Therapeutics international conferences, and the 2012 Annual Meeting of The Antibody Society, organized by IBC Life Sciences with contributions from The Antibody Society and two Scientific Advisory Boards, were held December 3–6, 2012 in San Diego, CA. The meeting drew over 800 participants who attended sessions on a wide variety of topics relevant to antibody research and development. As a prelude to the main events, a pre-conference workshop held on December 2, 2012 focused on intellectual property issues that impact antibody engineering. The Antibody Engineering Conference was composed of six sessions held December 3–5, 2012: (1) From Receptor Biology to Therapy; (2) Antibodies in a Complex Environment; (3) Antibody Targeted CNS Therapy: Beyond the Blood Brain Barrier; (4) Deep Sequencing in B Cell Biology and Antibody Libraries; (5) Systems Medicine in the Development of Antibody Therapies/Systematic Validation of Novel Antibody Targets; and (6) Antibody Activity and Animal Models. The Antibody Therapeutics conference comprised four sessions held December 4–5, 2012: (1) Clinical and Preclinical Updates of Antibody-Drug Conjugates; (2) Multifunctional Antibodies and Antibody Combinations: Clinical Focus; (3) Development Status of Immunomodulatory Therapeutic Antibodies; and (4) Modulating the Half-Life of Antibody Therapeutics. The Antibody Society’s special session on applications for recording and sharing data based on GIATE was held on December 5, 2012, and the conferences concluded with two combined sessions on December 5–6, 2012: (1) Development Status of Early Stage Therapeutic Antibodies; and (2) Immunomodulatory Antibodies for Cancer Therapy. PMID:23575266

  2. 25 CFR 63.25-63.29 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false [Reserved] 63.25-63.29 Section 63.25-63.29 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR TRIBAL GOVERNMENT INDIAN CHILD PROTECTION AND FAMILY VIOLENCE PREVENTION Minimum Standards of Character and Suitability for Employment §§ 63.25-63.29 [Reserved] ...

  3. 25 CFR 63.37-63.50 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false [Reserved] 63.37-63.50 Section 63.37-63.50 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR TRIBAL GOVERNMENT INDIAN CHILD PROTECTION AND FAMILY VIOLENCE PREVENTION Indian Child Protection and Family Violence Prevention Program §§ 63.37-63.50 [Reserved] ...

  4. 40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...

  5. 40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...

  6. 40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...

  7. 40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...

  8. 40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...

  9. 40 CFR 63.11086 - What requirements must I meet if my facility is a bulk gasoline plant?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facility is a bulk gasoline plant? 63.11086 Section 63.11086 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... gasoline plant? Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must...

  10. 40 CFR 63.11086 - What requirements must I meet if my facility is a bulk gasoline plant?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facility is a bulk gasoline plant? 63.11086 Section 63.11086 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... gasoline plant? Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must...

  11. 40 CFR 63.11086 - What requirements must I meet if my facility is a bulk gasoline plant?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility is a bulk gasoline plant? 63.11086 Section 63.11086 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... gasoline plant? Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must...

  12. 40 CFR 63.11086 - What requirements must I meet if my facility is a bulk gasoline plant?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility is a bulk gasoline plant? 63.11086 Section 63.11086 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... gasoline plant? Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must...

  13. 40 CFR 63.11086 - What requirements must I meet if my facility is a bulk gasoline plant?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility is a bulk gasoline plant? 63.11086 Section 63.11086 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... gasoline plant? Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must...

  14. 43rd Aerospace Mechanisms Symposium

    NASA Technical Reports Server (NTRS)

    Boesiger, Edward A.

    2016-01-01

    The Aerospace Mechanisms Symposium (AMS) provides a unique forum for those active in the design, production and use of aerospace mechanisms. A major focus is the reporting of problems and solutions associated with the development and flight certification of new mechanisms. Sponsored and organized by the Mechanisms Education Association, responsibility for hosting the AMS is shared by the National Aeronautics and Space Administration and Lockheed Martin Space Systems Company (LMSSC). Now in its 43rd symposium, the AMS continues to be well attended, attracting participants from both the U.S. and abroad. The 43rd AMS was held in Santa Clara, California on May 4, 5 and 6, 2016. During these three days, 42 papers were presented. Topics included payload and positioning mechanisms, components such as hinges and motors, CubeSats, tribology, and mechanism testing. Hardware displays during the supplier exhibit gave attendees an opportunity to meet with developers of current and future mechanism components. The high quality of this symposium is a result of the work of many people, and their efforts are gratefully acknowledged. This extends to the voluntary members of the symposium organizing committee representing the eight NASA field centers, LMSSC, and the European Space Agency. Appreciation is also extended to the session chairs, the authors, and particularly the personnel at ARC responsible for the symposium arrangements and the publication of these proceedings. A sincere thank you also goes to the symposium executive committee who is responsible for the year-to-year management of the AMS, including paper processing and preparation of the program. The use of trade names of manufacturers in this publication does not constitute an official endorsement of such products or manufacturers, either expressed or implied, by the National Aeronautics and Space Administration.

  15. Coordinating Council. Third Meeting: STI Strategic Plans

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The NASA Scientific and Technical Information Program Coordinating Council conducts meetings after which both modified transcripts of presentations and interactive discussions are published. The theme for the November 1990 meeting was 'STI Strategic Plans'. This theme was the focus of recorded discussions by members of the council. The last section of the report presents visuals on strategic goals for the STI Information Division. NASA's vision is to be at the forefront of advancements in aeronautics, space science, and exploration. More specific NASA goals are listed followed by the STI Division mission statement. The Strategic Goals for the STI Division are outlined as follows: Implement effective management strategies, Accomplish rapid deployment of the NASA STI Network, Seek out and develop cooperative partnerships, Establish the STI Program as an integral part of the NASA R&D effort, Enhance the quality of our products and services through a focus on the customer, Build an attitude of quality throughout the enterprise, Expand the existing participant community, Assert a NASA leadership role for STI policy, and Develop a program for information science R&D. The STI division mission statement appears on the document cover as follows 'The mission of the NASA STI Program is to advance aerospace knowledge, contribute to U.S. competitiveness, and become an integral partner in NASA R&D programs to support NASA goals.'

  16. 40 CFR 63.3890 - What emission limits must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards for Hazardous Air Pollutants for Surface Coating of Miscellaneous Metal Parts and Products... surface coating operations meet the applicability criteria of more than one of the subcategory emission.... (1) If the general use or magnet wire surface coating operations subject to only one of the emission...

  17. Meeting report on the 3rd International Congress on Developmental Origins of Health and Disease (DOHaD)

    USDA-ARS?s Scientific Manuscript database

    Developmental Origins of Health and Disease (DOHaD) focuses on the earliest stages of human development, and provides a novel paradigm to complement other strategies for lifelong prevention of common chronic health conditions. The 3rd International Congress on DOHaD, held in 2005, retained the most ...

  18. 40 CFR 63.7790 - What emission limitations must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) For each venturi scrubber applied to meet any particulate emission limit in Table 1 to this subpart, you must maintain the hourly average pressure drop and scrubber water flow rate at or above the... other than a baghouse, venturi scrubber, or electrostatic precipitator must submit a description of the...

  19. 40 CFR 63.3890 - What emission limits must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) National Emission Standards for Hazardous Air Pollutants for Surface Coating of Miscellaneous Metal Parts... each 12-month compliance period. (c) If your facility's surface coating operations meet the... alternatives in paragraph (c)(1) or (2) of this section. (1) If the general use or magnet wire surface coating...

  20. 40 CFR 63.3890 - What emission limits must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) National Emission Standards for Hazardous Air Pollutants for Surface Coating of Miscellaneous Metal Parts... each 12-month compliance period. (c) If your facility's surface coating operations meet the... alternatives in paragraph (c)(1) or (2) of this section. (1) If the general use or magnet wire surface coating...

  1. 40 CFR 63.7790 - What emission limitations must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) For each venturi scrubber applied to meet any particulate emission limit in Table 1 to this subpart, you must maintain the hourly average pressure drop and scrubber water flow rate at or above the... other than a baghouse, venturi scrubber, or electrostatic precipitator must submit a description of the...

  2. Crowdsourced 'R&D' and medical research.

    PubMed

    Callaghan, Christian William

    2015-09-01

    Crowdsourced R&D, a research methodology increasingly applied to medical research, has properties well suited to large-scale medical data collection and analysis, as well as enabling rapid research responses to crises such as disease outbreaks. Multidisciplinary literature offers diverse perspectives of crowdsourced R&D as a useful large-scale medical data collection and research problem-solving methodology. Crowdsourced R&D has demonstrated 'proof of concept' in a host of different biomedical research applications. A wide range of quality and ethical issues relate to crowdsourced R&D. The rapid growth in applications of crowdsourced R&D in medical research is predicted by an increasing body of multidisciplinary theory. Further research in areas such as artificial intelligence may allow better coordination and management of the high volumes of medical data and problem-solving inputs generated by the crowdsourced R&D process. © The Author 2015. Published by Oxford University Press. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  3. Office Organization and Procedures in the Office--Calendar; Commencement Procedure; Publications; Records; Registration; Reports; Scheduling; Staffing; Testing; Transcripts

    ERIC Educational Resources Information Center

    College and University, 1977

    1977-01-01

    Proceedings of AACRAO's 63rd annual meeting cover: calendar conversion; publications economy; class schedules; fraudulent transcripts; student retention; student ID numbers; veteran student reporting; financial aid reporting; faculty activity analyses; time management; registration; and transcript forms for nontraditional programs. (LBH)

  4. 40 CFR 63.11561 - What are my standards and management practices?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Area Sources: Asphalt Processing and Asphalt Roofing Manufacturing Standards and Compliance Requirements § 63.11561 What are my standards and management practices? (a) For asphalt processing operations, you must meet the emission limits...

  5. 40 CFR 63.11561 - What are my standards and management practices?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Area Sources: Asphalt Processing and Asphalt Roofing Manufacturing Standards and Compliance Requirements § 63.11561 What are my standards and management practices? (a) For asphalt processing operations, you must meet the emission limits...

  6. 40 CFR 63.11561 - What are my standards and management practices?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Area Sources: Asphalt Processing and Asphalt Roofing Manufacturing Standards and Compliance Requirements § 63.11561 What are my standards and management practices? (a) For asphalt processing operations, you must meet the emission limits...

  7. 40 CFR 63.11561 - What are my standards and management practices?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Area Sources: Asphalt Processing and Asphalt Roofing Manufacturing Standards and Compliance Requirements § 63.11561 What are my standards and management practices? (a) For asphalt processing operations, you must meet the emission limits...

  8. 76 FR 30308 - National Standard 10 Guidelines; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... Standard 10 Guidelines; Public Meetings AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... to the National Standard 10 (NS10) Guidelines and announced a public meeting to be held on May 19... practicable, promote the safety of human life at sea.'' NMFS published final guidelines for NS10 in 1998 (63...

  9. R&D Jobs for BS Engineers.

    ERIC Educational Resources Information Center

    Basta, Nicholas

    1985-01-01

    Outlines opportunities for beginning engineers seeking employment in research and development (R&D). R&D spending growth, underlying factors, job categories, and divisions within an industrial firm are discussed. Above average grades and additional mathematics courses are primary requirements for an R&D position, which may later lead to…

  10. 40 CFR 63.2480 - What requirements must I meet for equipment leaks?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Manufacturing Emission Limits, Work Practice Standards, and Compliance Requirements § 63.2480 What requirements... reconfiguration of an equipment train if flexible hose connections are the only disturbed equipment. (3) For an... accordance with § 65.117(b) is not required after reconfiguration of an equipment train if flexible hose...

  11. Final report: ES11: The 23rd Annual Workshop on Electronic Structure Methods

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rappe, Andrew M.

    2011-08-31

    ES11: the 23rd Annual Workshop on Electronic Structure Methods was held from June 6-9, 2011 at the University of Pennsylvania. The local organizing committee (see Section II) led by PI Andrew M. Rappe supervised the organization of the conference, before, during, and after the meeting itself. The national organizing committee set the technical program of talks, and provided support and advice in various ways. The conference was well-attended (see Section III). An important feature of this conference was a series of panel discussions (see Section IV) to discuss the field of electronic structure and to set new directions. The technicalmore » program was of extraordinarily high quality (see Section V). The host institution, the University of Pennsylvania, provided a supportive environment for this meeting (see Section VI).« less

  12. 40 CFR 63.4291 - What are my options for meeting the emission limits?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission capture systems and add-on controls, the organic HAP emission rate for the web coating/printing... demonstrate that all capture systems and control devices for the web coating/printing operation(s) meet the... capture systems and control devices for the web coating/printing operation(s) meet the operating limits...

  13. 40 CFR 63.45-63.49 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false [Reserved] 63.45-63.49 Section 63.45-63.49 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Technology Determinations for Major Sources in Accordance With Clean Air Act Sections, Sections 112(g) and...

  14. Proceedings of the Annual Conference of the Western Australian Science Education Association (23rd, Perth, Western Australia, November 13, 1998).

    ERIC Educational Resources Information Center

    Rennie, Leonie, Ed.

    These proceedings contain reviewed and edited papers from the 23rd annual meeting of the Western Australian Science Education Association (WASEA). Papers include: (1) Using Quantitative and Qualitative Approaches to Validate a Questionnaire to Describe Science Teacher Behavior in Taiwan and Australia (Darrell Fisher, David Henderson, and…

  15. 77 FR 24938 - National Assessment Governing Board; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... to individuals with disabilities. DATES: May 17-19, 2012. Times May 17 Committee Meetings Assessment... Dissemination Committee (R&D): Open Session: 10 a.m.- 12:30 p.m. Committee on Standards, Design and Methodology... May 18 will be a briefing on the NAEP mathematics special studies: the Mathematics Computer-based...

  16. Stretching a Buck: A Multimedia Approach in Continuing Education

    ERIC Educational Resources Information Center

    Fetterman, Elsie; Kabot, Margery L.

    1972-01-01

    Reports on the success and wide coverage of a home economics television program broadcast through State extension services. Adaptation of a speech given at the 63rd Annual Meeting of the American Home Economics Association in Detroit, Michigan, June 28, 1972. (DS)

  17. 40 CFR 63.7184 - What emission limitations, operating limits, and work practice standards must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Pollutants for Semiconductor Manufacturing Emission Standards § 63.7184 What emission limitations, operating... this section on and after the compliance dates specified in § 63.7183. (b) Process vents—organic HAP emissions. For each organic HAP process vent, other than process vents from storage tanks, you must limit...

  18. 40 CFR 63.7184 - What emission limitations, operating limits, and work practice standards must I meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Pollutants for Semiconductor Manufacturing Emission Standards § 63.7184 What emission limitations, operating... this section on and after the compliance dates specified in § 63.7183. (b) Process vents—organic HAP emissions. For each organic HAP process vent, other than process vents from storage tanks, you must limit...

  19. 40 CFR 63.2490 - What requirements must I meet for heat exchange systems?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements must I meet for heat exchange systems? (a) You must comply with each requirement in Table 10 to this subpart that applies to your heat exchange systems, except as specified in paragraphs (b) and (c... 40 Protection of Environment 13 2012-07-01 2012-07-01 false What requirements must I meet for heat...

  20. 40 CFR 63.2490 - What requirements must I meet for heat exchange systems?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements must I meet for heat exchange systems? (a) You must comply with each requirement in Table 10 to this subpart that applies to your heat exchange systems, except as specified in paragraphs (b) and (c... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What requirements must I meet for heat...

  1. 40 CFR 63.2490 - What requirements must I meet for heat exchange systems?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements must I meet for heat exchange systems? (a) You must comply with each requirement in Table 10 to this subpart that applies to your heat exchange systems, except as specified in paragraphs (b) and (c... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What requirements must I meet for heat...

  2. Proceedings. Northwest Association of Schools and Colleges Annual Convention (63rd, Hilton Hotel, Portland, Oregon, December 1-4, 1979).

    ERIC Educational Resources Information Center

    Northwest Association of Schools and Colleges, Seattle, WA.

    The proceedings of the 1979 annual meeting of the Northwest Association of Schools and Colleges begins by listing the officers, trustees, and commissioners of the association, and outlining the program of the meeting. The minutes from the Commission on Schools include reports from: the state committees of Alaska, Idaho, Montana, Nevada, Oregon,…

  3. 40 CFR 63.11170 - Am I subject to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subject to this subpart if you operate an area source of HAP as defined in paragraph (b) of this section... coatings, as defined in § 63.11180, to motor vehicles and mobile equipment including operations that are... travel to the customer's location, except spray coating applications that meet the definition of facility...

  4. 40 CFR 63.2490 - What requirements must I meet for heat exchange systems?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... must I meet for heat exchange systems? (a) You must comply with each requirement in Table 10 to this subpart that applies to your heat exchange systems, except as specified in paragraphs (b) and (c) of this... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What requirements must I meet for heat...

  5. 40 CFR 63.2490 - What requirements must I meet for heat exchange systems?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must I meet for heat exchange systems? (a) You must comply with each requirement in Table 10 to this subpart that applies to your heat exchange systems, except as specified in paragraphs (b) and (c) of this... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What requirements must I meet for heat...

  6. Clarithromycin (Biaxin)-lenalidomide-low-dose dexamethasone (BiRd) versus lenalidomide-low-dose dexamethasone (Rd) for newly diagnosed myeloma.

    PubMed

    Gay, Francesca; Rajkumar, S Vincent; Coleman, Morton; Kumar, Shaji; Mark, Tomer; Dispenzieri, Angela; Pearse, Roger; Gertz, Morie A; Leonard, John; Lacy, Martha Q; Chen-Kiang, Selina; Roy, Vivek; Jayabalan, David S; Lust, John A; Witzig, Thomas E; Fonseca, Rafael; Kyle, Robert A; Greipp, Philip R; Stewart, A Keith; Niesvizky, Ruben

    2010-09-01

    The objective of this case-matched study was to compare the efficacy and toxicity of the addition of clarithromycin (Biaxin) to lenalidomide/low-dose dexamethasone (BiRd) vs. lenalidomide/low-dose dexamethasone (Rd) for newly diagnosed myeloma. Data from 72 patients treated at the New York Presbyterian Hospital-Cornell Medical Center were retrospectively compared with an equal number of matched pair mates selected among patients seen at the Mayo Clinic who received Rd. Case matching was blinded and was performed according to age, gender, and transplant status. On intention-to-treat analysis, complete response (45.8% vs. 13.9%, P < 0.001) and very-good-partial-response or better (73.6% vs. 33.3%, P < 0.001) were significantly higher with BiRd. Time-to-progression (median 48.3 vs. 27.5 months, P = 0.071), and progression-free survival (median 48.3 vs. 27.5 months, P = 0.044) were higher with BiRd. There was a trend toward better OS with BiRd (3-year OS: 89.7% vs. 73.0%, P = 0.170). Main grade 3-4 toxicities of BiRd were hematological, in particular thrombocytopenia (23.6% vs. 8.3%, P = 0.012). Infections (16.7% vs. 9.7%, P = 0.218) and dermatological toxicity (12.5% vs. 4.2%, P = 0.129) were higher with Rd. Results of this case-matched analysis suggest that there is significant additive value when clarithromycin is added to Rd. Randomized phase III trials are needed to confirm these results. © 2010 Wiley-Liss, Inc.

  7. Evaluating firms' R&D performance using best worst method.

    PubMed

    Salimi, Negin; Rezaei, Jafar

    2018-02-01

    Since research and development (R&D) is the most critical determinant of the productivity, growth and competitive advantage of firms, measuring R&D performance has become the core of attention of R&D managers, and an extensive body of literature has examined and identified different R&D measurements and determinants of R&D performance. However, measuring R&D performance and assigning the same level of importance to different R&D measures, which is the common approach in existing studies, can oversimplify the R&D measuring process, which may result in misinterpretation of the performance and consequently fallacy R&D strategies. The aim of this study is to measure R&D performance taking into account the different levels of importance of R&D measures, using a multi-criteria decision-making method called Best Worst Method (BWM) to identify the weights (importance) of R&D measures and measure the R&D performance of 50 high-tech SMEs in the Netherlands using the data gathered in a survey among SMEs and from R&D experts. The results show how assigning different weights to different R&D measures (in contrast to simple mean) results in a different ranking of the firms and allow R&D managers to formulate more effective strategies to improve their firm's R&D performance by applying knowledge regarding the importance of different R&D measures. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  8. ATLAS Cloud R&D

    NASA Astrophysics Data System (ADS)

    Panitkin, Sergey; Barreiro Megino, Fernando; Caballero Bejar, Jose; Benjamin, Doug; Di Girolamo, Alessandro; Gable, Ian; Hendrix, Val; Hover, John; Kucharczyk, Katarzyna; Medrano Llamas, Ramon; Love, Peter; Ohman, Henrik; Paterson, Michael; Sobie, Randall; Taylor, Ryan; Walker, Rodney; Zaytsev, Alexander; Atlas Collaboration

    2014-06-01

    The computing model of the ATLAS experiment was designed around the concept of grid computing and, since the start of data taking, this model has proven very successful. However, new cloud computing technologies bring attractive features to improve the operations and elasticity of scientific distributed computing. ATLAS sees grid and cloud computing as complementary technologies that will coexist at different levels of resource abstraction, and two years ago created an R&D working group to investigate the different integration scenarios. The ATLAS Cloud Computing R&D has been able to demonstrate the feasibility of offloading work from grid to cloud sites and, as of today, is able to integrate transparently various cloud resources into the PanDA workload management system. The ATLAS Cloud Computing R&D is operating various PanDA queues on private and public resources and has provided several hundred thousand CPU days to the experiment. As a result, the ATLAS Cloud Computing R&D group has gained a significant insight into the cloud computing landscape and has identified points that still need to be addressed in order to fully utilize this technology. This contribution will explain the cloud integration models that are being evaluated and will discuss ATLAS' learning during the collaboration with leading commercial and academic cloud providers.

  9. 77 FR 2961 - North Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... Pacific Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS... Fishery Management Council Golden King Crab Price Formula Workgroup. SUMMARY: The North Pacific Fishery... 1201 3rd Avenue, Suite 4800, Seattle, WA 98121-3099. Council address: North Pacific Fishery Management...

  10. 22 CFR 63.2 - Applicability of this part under special circumstances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TO AND ON BEHALF OF PARTICIPANTS IN THE INTERNATIONAL EDUCATIONAL AND CULTURAL EXCHANGE PROGRAM § 63... in each case to meet the exigencies of the particular situation. (c) Appropriations or allocations. The regulations in this part shall apply to payments made by the Agency with respect to appropriations...

  11. 22 CFR 63.2 - Applicability of this part under special circumstances.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... TO AND ON BEHALF OF PARTICIPANTS IN THE INTERNATIONAL EDUCATIONAL AND CULTURAL EXCHANGE PROGRAM § 63... in each case to meet the exigencies of the particular situation. (c) Appropriations or allocations. The regulations in this part shall apply to payments made by the Agency with respect to appropriations...

  12. 77 FR 67735 - Open Meeting of the Taxpayer Advocacy Panel Toll-Free Phone Line Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... Toll-Free Phone Line Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Toll-Free Phone Line Project... Taxpayer Advocacy Panel Toll-Free Phone Line Project Committee will be held Monday, December 3rd, 2012...

  13. 40 CFR 63.7936 - What requirements must I meet if I transfer remediation material off-site to another facility?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... transfer remediation material off-site to another facility? 63.7936 Section 63.7936 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS... Hazardous Air Pollutants: Site Remediation General Compliance Requirements § 63.7936 What requirements must...

  14. 40 CFR 63.7936 - What requirements must I meet if I transfer remediation material off-site to another facility?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... transfer remediation material off-site to another facility? 63.7936 Section 63.7936 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS... Hazardous Air Pollutants: Site Remediation General Compliance Requirements § 63.7936 What requirements must...

  15. 40 CFR 63.7936 - What requirements must I meet if I transfer remediation material off-site to another facility?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... transfer remediation material off-site to another facility? 63.7936 Section 63.7936 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS... Hazardous Air Pollutants: Site Remediation General Compliance Requirements § 63.7936 What requirements must...

  16. 40 CFR 63.7936 - What requirements must I meet if I transfer remediation material off-site to another facility?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... transfer remediation material off-site to another facility? 63.7936 Section 63.7936 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS... Hazardous Air Pollutants: Site Remediation General Compliance Requirements § 63.7936 What requirements must...

  17. 40 CFR 63.854-63.859 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....854-63.859 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Primary Aluminum Reduction Plants §§ 63.854-63...

  18. 40 CFR 63.854-63.859 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....854-63.859 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Primary Aluminum Reduction Plants §§ 63.854-63...

  19. 40 CFR 63.854-63.859 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....854-63.859 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Primary Aluminum Reduction Plants §§ 63.854-63...

  20. 40 CFR 63.854-63.859 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....854-63.859 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Primary Aluminum Reduction Plants §§ 63.854-63...

  1. 40 CFR 63.2455 - What requirements must I meet for continuous process vents?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CATEGORIES National Emission Standards for Hazardous Air Pollutants: Miscellaneous Organic Chemical... any continuous process vent that is combined with Group 1 batch process vents before a control device or recovery device because the requirements of § 63.2450(c)(2)(i) apply to the combined stream. (2...

  2. Agricultural R&D, technology and productivity.

    PubMed

    Piesse, J; Thirtle, C

    2010-09-27

    The relationships between basic and applied agricultural R&D, developed and developing country R&D and between R&D, extension, technology and productivity growth are outlined. The declining growth rates of public R&D expenditures are related to output growth and crop yields, where growth rates have also fallen, especially in the developed countries. However, growth in output value per hectare has not declined in the developing countries and labour productivity growth has increased except in the EU. Total factor productivity has generally increased, however it is measured. The public sector share of R&D expenditures has fallen and there has been rapid concentration in the private sector, where six multinationals now dominate. These companies are accumulating intellectual property to an extent that the public and international institutions are disadvantaged. This represents a threat to the global commons in agricultural technology on which the green revolution has depended. Estimates of the increased R&D expenditures needed to feed 9 billion people by 2050 and how these should be targeted, especially by the Consultative Group on International Agricultural Research (CGIAR), show that the amounts are feasible and that targeting sub-Saharan Africa (SSA) and South Asia can best increase output growth and reduce poverty. Lack of income growth in SSA is seen as the most insoluble problem.

  3. Agricultural R&D, technology and productivity

    PubMed Central

    Piesse, J.; Thirtle, C.

    2010-01-01

    The relationships between basic and applied agricultural R&D, developed and developing country R&D and between R&D, extension, technology and productivity growth are outlined. The declining growth rates of public R&D expenditures are related to output growth and crop yields, where growth rates have also fallen, especially in the developed countries. However, growth in output value per hectare has not declined in the developing countries and labour productivity growth has increased except in the EU. Total factor productivity has generally increased, however it is measured. The public sector share of R&D expenditures has fallen and there has been rapid concentration in the private sector, where six multinationals now dominate. These companies are accumulating intellectual property to an extent that the public and international institutions are disadvantaged. This represents a threat to the global commons in agricultural technology on which the green revolution has depended. Estimates of the increased R&D expenditures needed to feed 9 billion people by 2050 and how these should be targeted, especially by the Consultative Group on International Agricultural Research (CGIAR), show that the amounts are feasible and that targeting sub-Saharan Africa (SSA) and South Asia can best increase output growth and reduce poverty. Lack of income growth in SSA is seen as the most insoluble problem. PMID:20713401

  4. 77 FR 40325 - Agenda and Notice of Public Meeting of the North Dakota Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    .... Commission on Civil Rights, and the Federal Advisory Committee Act (FACA), that a planning meeting of the..., at the River Room, Fargo City Hall, 200 N. 3rd Street, Fargo, ND 58102. The purpose of the planning... street address. Deaf or hearing-impaired persons who will attend the meeting and require the services of...

  5. Kokes Award for the 24th North American Catalysis Society Meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rioux, Robert M.

    The objective of the Richard. J. Kokes Travel Award program is to encourage the participation of students in the biennial North American Catalysis Society (NACS) Meetings. The Kokes Award covers a significant portion of the transportation, lodging, and conference registration costs. Eligible students must be enrolled at a North American university and need to present a paper at the meeting. The Kokes awardee will be required to contribute some time to the organizing committee to assist in meeting operations and to be present at the meeting during the entire time. Similar to the 23rd Kokes Award program, undergraduate students aremore » also eligible for the 24th Kokes Award program.« less

  6. 40 CFR 63.7295 - What requirements must I meet for quenching?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and... each quench tower and backup quench station at a new or existing coke oven battery. (1) For the quenching of hot coke, you must meet the requirements in paragraph (a)(1)(i) or (ii) of this section. (i...

  7. 40 CFR 63.7295 - What requirements must I meet for quenching?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and... each quench tower and backup quench station at a new or existing coke oven battery. (1) For the quenching of hot coke, you must meet the requirements in paragraph (a)(1)(i) or (ii) of this section. (i...

  8. 40 CFR 63.7295 - What requirements must I meet for quenching?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and... each quench tower and backup quench station at a new or existing coke oven battery. (1) For the quenching of hot coke, you must meet the requirements in paragraph (a)(1)(i) or (ii) of this section. (i...

  9. 40 CFR 63.7295 - What requirements must I meet for quenching?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and... each quench tower and backup quench station at a new or existing coke oven battery. (1) For the quenching of hot coke, you must meet the requirements in paragraph (a)(1)(i) or (ii) of this section. (i...

  10. 40 CFR 63.7295 - What requirements must I meet for quenching?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and... each quench tower and backup quench station at a new or existing coke oven battery. (1) For the quenching of hot coke, you must meet the requirements in paragraph (a)(1)(i) or (ii) of this section. (i...

  11. Conference Support, 23rd Western Photosynthesis Conference 2014, Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wachter, Rebekka

    The Western Photosynthesis Conference is a regional conference that is held on an annual basis to bring together researchers primarily from the Western United States to share their newest research advances on photosynthetic processes. The 23rd conference was focused on both fundamental and more applied research on the biological conversion of solar energy to various energy storage forms. Several particular areas of solar energy conversion were emphasized in this conference (see below). Some of these topics, such as carbon limitations on photosynthesis, biomimicry and phenotyping, have traditionally not been incorporated extensively in the Western Photosynthesis Conference. We found that thesemore » topics have substantially broadened of the scope of this meeting.« less

  12. 40 CFR 63.11930 - What requirements must I meet for closed vent systems?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Chloride and Copolymers Production Testing and Compliance Requirements § 63.11930 What requirements must I...) Zero air (less than 10 parts per million by volume hydrocarbon in air). (B) Mixtures of methane in air at a concentration less than 10,000 parts per million by volume. A calibration gas other than methane...

  13. 40 CFR 63.11930 - What requirements must I meet for closed vent systems?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Chloride and Copolymers Production Testing and Compliance Requirements § 63.11930 What requirements must I...) Zero air (less than 10 parts per million by volume hydrocarbon in air). (B) Mixtures of methane in air at a concentration less than 10,000 parts per million by volume. A calibration gas other than methane...

  14. 78 FR 24438 - Board of Directors Audit Committee; Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... NEIGHBORHOOD REINVESTMENT CORPORATION Board of Directors Audit Committee; Sunshine Act Meeting... Secretary (202) 220-2376; [email protected] . AGENDA: I. CALL TO ORDER II. Executive Session with Internal Audit... Policy VI. External 3rd Party Audit Communication VII. FY 2014 Risk Assessment & Draft Internal Audit...

  15. BMI1 loss delays photoreceptor degeneration in Rd1 mice. Bmi1 loss and neuroprotection in Rd1 mice.

    PubMed

    Zencak, Dusan; Crippa, Sylvain V; Tekaya, Meriem; Tanger, Ellen; Schorderet, Daniel E; Munier, Francis L; van Lohuizen, Maarten; Arsenijevic, Yvan

    2006-01-01

    Retinitis pigmentosa (RP) is a heterogeneous group of genetic disorders leading to blindness, which remain untreatable at present. Rd1 mice represent a recognized model of RP, and so far only GDNF treatment provided a slight delay in the retinal degeneration in these mice. Bmi1, a transcriptional repressor, has recently been shown to be essential for neural stem cell (NSC) renewal in the brain, with an increased appearance of glial cells in vivo in Bmi1 knockout (Bmi1-/-) mice. One of the roles of glial cells is to sustain neuronal function and survival. In the view of a role of the retinal Miller glia as a source of neural protection in the retina, the increased astrocytic population in the Bmi1-/- brain led us to investigate the effect of Bmi1 loss in Rd1 mice. We observed an increase of Müller glial cells in Rd1-Bmi1-/- retinas compared to Rd1. Moreover, Rd1-Bmi1-/- mice showed 7-8 rows of photoreceptors at 30 days of age (P30), while in Rd1 littermates there was a complete disruption of the outer nuclear layer (ONL). Preliminary ERG results showed a responsiveness of Rd1-Bmi1-/- mice in scotopic vision at P35. In conclusion, Bmi1 loss prevented, or rescued, photoreceptors from degeneration to an unanticipated extent in Rd1 mice. In this chapter, we will first provide a brief review of our work on the cortical NSCs and introduce the Bmi1 oncogene, thus offering a rational to our observations on the retina.

  16. Current Practices: Future Directions. Outreach Meeting Report (3rd, Portland, Oregon, May 3, 1989).

    ERIC Educational Resources Information Center

    Morse, Susan

    This document reports on the Migrant Education Secondary Assistance Project's third and final outreach meeting, conducted in conjunction with the National Migrant Education Conference attended by migrant educators from across the nation. These educators have identified effective preventative strategies such as the elimination of grade retention,…

  17. Pipeline Transportation Safety R and D Working Group Meeting, Proceedings Held at Cambridge, Massachusetts on June 30-July 1, 1980

    DOT National Transportation Integrated Search

    1980-01-01

    A pipeline Transportation Safety R&D Working Group Meeting took place at the DOT Transportation Center on June 30 - July 1, 1980. The objective of this meeting was to reach concensus on future popeline transportation safety issues and possible soulti...

  18. 40 CFR 63.2460 - What requirements must I meet for batch process vents?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (ii) When you conduct a performance test or design evaluation for a non-flare control device used to... paragraphs (c)(9)(ii)(A) through (D) of this section. The design evaluation option for small control devices...) of this section. (b) Group status. If a process has batch process vents, as defined in § 63.2550, you...

  19. 40 CFR 63.2460 - What requirements must I meet for batch process vents?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (ii) When you conduct a performance test or design evaluation for a non-flare control device used to... paragraphs (c)(9)(ii)(A) through (D) of this section. The design evaluation option for small control devices...) of this section. (b) Group status. If a process has batch process vents, as defined in § 63.2550, you...

  20. 40 CFR 63.2460 - What requirements must I meet for batch process vents?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... (ii) When you conduct a performance test or design evaluation for a non-flare control device used to... paragraphs (c)(9)(ii)(A) through (D) of this section. The design evaluation option for small control devices... (c) of this section. (b) Group status. If a process has batch process vents, as defined in § 63.2550...

  1. 40 CFR 63.2460 - What requirements must I meet for batch process vents?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (ii) When you conduct a performance test or design evaluation for a non-flare control device used to... paragraphs (c)(9)(ii)(A) through (D) of this section. The design evaluation option for small control devices... (c) of this section. (b) Group status. If a process has batch process vents, as defined in § 63.2550...

  2. 40 CFR 63.2460 - What requirements must I meet for batch process vents?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (ii) When you conduct a performance test or design evaluation for a non-flare control device used to... paragraphs (c)(9)(ii)(A) through (D) of this section. The design evaluation option for small control devices... (c) of this section. (b) Group status. If a process has batch process vents, as defined in § 63.2550...

  3. Strategic Sourcing of R&D: The Determinants of Success

    NASA Astrophysics Data System (ADS)

    Brook, Jacques W.; Plugge, Albert

    The outsourcing of the R&D function is an emerging practice of corporate firms. In their attempt to reduce the increasing cost of research and technology development, firms are strategically outsourcing the R&D function or repositioning their internal R&D organisation. By doing so, they are able to benefit from other technology sources around the world. So far, there is only limited research on how firms develop their R&D sourcing strategies and how these strategies are implemented. This study aims to identify which determinants contribute to the success of R&D sourcing strategies. The results of our empirical research indicate that a clear vision of how to manage innovation strategically on a corporate level is a determinant of an effective R&D strategy. Moreover, our findings revealed that the R&D sourcing strategy influences a firm's sourcing capabilities. These sourcing capabilities need to be developed to manage the demand as well as the supply of R&D services. The alignment between the demand capabilities and the supply capabilities contributes to the success of R&D sourcing.

  4. 40 CFR 63.1184 - What do I need to know about the design specifications, installation, and operation of a bag leak...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... design specifications, installation, and operation of a bag leak detection system? 63.1184 Section 63... bag leak detection system? A bag leak detection system must meet the following requirements: (a) The bag leak detection system must be certified by the manufacturer to be capable of detecting PM...

  5. 77 FR 55891 - Notice of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ...'') will meet from October 2-3, 2012 at the House of Sweden Event Center, 2900 K Street NW., Washington, DC 20007. The meeting will last from 9 a.m. until approximately 5 p.m. on October 2nd and from 9 a.m. until approximately 3 p.m. on October 3rd and is open to the public. The meeting will be hosted by the Office of the U...

  6. 47 CFR 63.63 - Emergency discontinuance, reduction, or impairment of service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... impairment of service. 63.63 Section 63.63 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED... AND IMPAIRMENT OF SERVICE BY COMMON CARRIERS; AND GRANTS OF RECOGNIZED PRIVATE OPERATING AGENCY STATUS Discontinuance, Reduction, Outage and Impairment § 63.63 Emergency discontinuance, reduction, or impairment of...

  7. 40 CFR 63.5734 - What standards must I meet for resin and gel coat application equipment cleaning operations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...? (a) For routine flushing of resin and gel coat application equipment (e.g., spray guns, flowcoaters... and gel coat application equipment cleaning operations? 63.5734 Section 63.5734 Protection of... Pollutants for Boat Manufacturing Standards for Resin and Gel Coat Application Equipment Cleaning Operations...

  8. 40 CFR 63.5110 - What special definitions are used in this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment used to apply an organic coating to the surface of metal coil. A coil coating line includes a web... emission limitation (including any operating limit) or work practice standard; (2) Fails to meet any term... before July 18, 2000, and it has not subsequently undergone reconstruction as defined in § 63.2. Facility...

  9. 5 CFR 8301.107 - Additional rules for RD employees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ETHICAL CONDUCT FOR EMPLOYEES OF THE DEPARTMENT OF AGRICULTURE § 8301.107 Additional rules for RD... business with RD, or one that sells repeatedly to RD borrowers or contractors for payment from RD loan... employee, may knowingly: Purchase an interest in or sell real property to; lease real property to or from...

  10. PREFACE: 3rd Iberian Meeting on Aerosol Science and Technology (RICTA 2015)

    NASA Astrophysics Data System (ADS)

    Orza, J. A. G.; Costa, M. J.

    2015-12-01

    The Third Iberian Meeting on Aerosol Science and Technology (RICTA 2015) was held in the city of Elche (province of Alicante, Spain) from 29 June to 1 July 2015, at Centro de Congresos Ciutat d'Elx. This event was organized and hosted by the Statistical and Computational Physics Laboratory (SCOLAb) of Universidad Miguel Hernández under the auspices of AECyTA, the Spanish Association for Aerosol Science and Technology Research. As in previous editions, the participation of young researchers was especially welcome, with the organization of the VI Summer School on Aerosol Science and Technology and awards for the best poster and PhD thesis, in recognition of outstanding research or presentations focusing on aerosols, during the early stage of their scientific career. RICTA 2015 aims to present the latest research and advances on the field of aerosols, as well as fostering interaction among the Portuguese and Spanish communities. The meeting gathered over 70 participants from 7 different countries, covering a wide range of aerosol science and technology. It included invited lectures, keynote talks, and several specialized sessions on different issues related to atmospheric aerosols, radiation, instrumentation, fundamental aerosol science, bioaerosols and health effects. The editors would like to express their sincere gratitude to all the participants, in particular, those who contributed to this special issue by submitting their papers to convey the current science discussed at RICTA 2015. In this special issue a series of peer-reviewed papers that cover a wide range of topics are presented: aerosol formation, emission, as well as aerosol composition in terms of physical and optical properties, spatial/temporal distribution of aerosol parameters, aerosol modeling and atmospheric effects, as well as instrumentation devoted to aerosol measurements. Finally, we also thank the referees for their valuable revision of these papers.

  11. 40 CFR 63.4141 - How do I demonstrate initial compliance with the emission limitations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants... option is not required to meet the operating limits or work practice standards required in §§ 63.4092 and...

  12. Does R&D pay?

    PubMed

    Cavalla, David; Minhas, Raman

    2010-03-01

    Pharmaceutical R&D is notoriously risky, lengthy and costly; moreover, it does not always produce products of blockbuster status. The conventional route of fully discovering, developing and marketing a new chemical entity is followed by the large pharmaceutical companies, whereas other organizations in the pharmaceutical sector--such as generic or specialty companies and biotechnology companies--only operate over portions of the full R&D process. Here, we compare the ten-year financial performance of these three subsectors through their price/earnings ratios and their return on capital metrics to understand which of these strategic alternatives offered the best return to investors. 2009 Elsevier Ltd. All rights reserved.

  13. Federal R&D funding: 10-year trends

    NASA Astrophysics Data System (ADS)

    Bell, Peter M.

    Research and development (R&D) funded by the federal government has grown steadily since 1971, according to the National Science Foundation (NSF). The total federal R&D funding gained at an annual rate of 8.6% in actual dollars. Substantial gains, on the order of 15% over 1981, had originally been planned but later revised downward, close to 0%, for the fiscal year 1982. The essential features of the 10-year trend are that federal R&D funding has been mostly directed toward the military—over twice the amount of all other types of R&D funding—and while military research funding is accelerating sharply, other research funding is on the decline. In simple terms, the 10-year increases are only for national defense.

  14. 76 FR 10008 - Meeting of the Reserve Forces Policy Board (RFPB)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-23

    ... DEPARTMENT OF DEFENSE Office of the Secretary Meeting of the Reserve Forces Policy Board (RFPB) AGENCY: Office of the Secretary of Defense Reserve Forces Policy Board, DoD. ACTION: Notice of Advisory... Committee: Reserve Forces Policy Board (RFPB). Date: Tuesday and Wednesday, March 22nd and 23rd, 2011. Time...

  15. 76 FR 82310 - Cardiovascular and Renal Drugs Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... (Parkinson's Disease, Multiple System Atrophy, and Pure Autonomic Failure), Dopamine Beta-Hydroxylase... recommendations to the Agency on FDA's regulatory issues. Date and Time: The meeting will be held on February 23... Colesville Rd., Silver Spring, MD 20910. The hotel's telephone number is (301) 589-5200. Contact Person...

  16. More States Retaining 3rd Graders

    ERIC Educational Resources Information Center

    Robelen, Erik W.

    2012-01-01

    As increasing numbers of states move to end social promotion of 3rd graders, some are also including interventions to help students learn to read. Oklahoma is one of several states that recently adopted new reading policies that--with limited exceptions--call for 3rd graders to be held back if they flunk a state standardized test. Supporters say…

  17. 40 CFR 63.9637 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... limitation in Table 1 to this subpart that applies to you. This includes periods of startup, shutdown, and... subpart. These deviations must be reported in accordance with the requirements in § 63.9641. (b) Startups... period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's...

  18. 40 CFR 63.9637 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... limitation in Table 1 to this subpart that applies to you. This includes periods of startup, shutdown, and... subpart. These deviations must be reported in accordance with the requirements in § 63.9641. (b) Startups... period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's...

  19. 40 CFR 63.9637 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... limitation in Table 1 to this subpart that applies to you. This includes periods of startup, shutdown, and... subpart. These deviations must be reported in accordance with the requirements in § 63.9641. (b) Startups... period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's...

  20. 40 CFR 63.9637 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... limitation in Table 1 to this subpart that applies to you. This includes periods of startup, shutdown, and... subpart. These deviations must be reported in accordance with the requirements in § 63.9641. (b) Startups... period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's...

  1. 40 CFR 63.9637 - What other requirements must I meet to demonstrate continuous compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... limitation in Table 1 to this subpart that applies to you. This includes periods of startup, shutdown, and... subpart. These deviations must be reported in accordance with the requirements in § 63.9641. (b) Startups... period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's...

  2. The productivity crisis in pharmaceutical R&D.

    PubMed

    Pammolli, Fabio; Magazzini, Laura; Riccaboni, Massimo

    2011-06-01

    Advances in the understanding of the molecular basis of diseases have expanded the number of plausible therapeutic targets for the development of innovative agents in recent decades. However, although investment in pharmaceutical research and development (R&D) has increased substantially in this time, the lack of a corresponding increase in the output in terms of new drugs being approved indicates that therapeutic innovation has become more challenging. Here, using a large database that contains information on R&D projects for more than 28,000 compounds investigated since 1990, we examine the decline of R&D productivity in pharmaceuticals in the past two decades and its determinants. We show that this decline is associated with an increasing concentration of R&D investments in areas in which the risk of failure is high, which correspond to unmet therapeutic needs and unexploited biological mechanisms. We also investigate the potential variations in productivity with regard to the regional location of companies and find that although companies based in the United States and Europe differ in the composition of their R&D portfolios, there is no evidence of any productivity gap.

  3. 40 CFR 63.11945 - What performance testing requirements must I meet for process vents?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... conduct the initial and periodic performance tests required in § 63.11925(d) and (e) and as specified in... tests under the conditions specified in paragraphs (b)(1) through (3) of this section, as applicable. Upon request, the owner or operator shall make available to the Administrator such records as may be...

  4. 40 CFR 63.11945 - What performance testing requirements must I meet for process vents?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... conduct the initial and periodic performance tests required in § 63.11925(d) and (e) and as specified in... tests under the conditions specified in paragraphs (b)(1) through (3) of this section, as applicable. Upon request, the owner or operator shall make available to the Administrator such records as may be...

  5. 40 CFR 63.11945 - What performance testing requirements must I meet for process vents?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... conduct the initial and periodic performance tests required in § 63.11925(d) and (e) and as specified in... tests under the conditions specified in paragraphs (b)(1) through (3) of this section, as applicable. Upon request, the owner or operator shall make available to the Administrator such records as may be...

  6. Solid-State Lighting R&D Plan - 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bardsley, Norman; Bland, Stephen; Hansen, Monica

    2015-05-28

    Provides analysis and direction for ongoing R&D activities to advance SSL technology and increase energy savings, reviewing SSL technology status and trends for both LEDs and OLEDs and offering an overview of the current DOE SSL R&D project portfolio.

  7. 40 CFR 63.7283 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., 2006. (b) If you have a new affected source and its initial startup date is on or before April 14, 2003... its initial startup date is after April 14, 2003, you must comply with each emission limitation, work... initial startup. (d) You must meet the notification and schedule requirements in § 63.7340. Several of...

  8. 40 CFR 63.7283 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., 2006. (b) If you have a new affected source and its initial startup date is on or before April 14, 2003... its initial startup date is after April 14, 2003, you must comply with each emission limitation, work... initial startup. (d) You must meet the notification and schedule requirements in § 63.7340. Several of...

  9. 40 CFR 63.7283 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., 2006. (b) If you have a new affected source and its initial startup date is on or before April 14, 2003... its initial startup date is after April 14, 2003, you must comply with each emission limitation, work... initial startup. (d) You must meet the notification and schedule requirements in § 63.7340. Several of...

  10. 40 CFR 63.7283 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 2006. (b) If you have a new affected source and its initial startup date is on or before April 14, 2003... its initial startup date is after April 14, 2003, you must comply with each emission limitation, work... initial startup. (d) You must meet the notification and schedule requirements in § 63.7340. Several of...

  11. 40 CFR 63.7283 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., 2006. (b) If you have a new affected source and its initial startup date is on or before April 14, 2003... its initial startup date is after April 14, 2003, you must comply with each emission limitation, work... initial startup. (d) You must meet the notification and schedule requirements in § 63.7340. Several of...

  12. WHO's role in the global health system: what can be learned from global R&D debates?

    PubMed

    Moon, Suerie

    2014-02-01

    Recent global debates on the research and development (R&D) of health technologies, such as drugs, diagnostics and vaccines, can be seen as a microcosm of discussions on the role of the World Health Organization (WHO) in the global health system more broadly. The global R&D system has come under heightened scrutiny with the publication of a 2012 report by the WHO Consultative Expert Working Group on Research and Development (CEWG), which made a number of recommendations to more equitably meet global health needs. The CEWG report followed a decade-long process of debate at the WHO on the weaknesses of the global R&D system, which include problems of affordability, limited research where market returns are small or uncertain (such as the 'neglected diseases' that predominantly affect the world's poorest), inefficient overlap of research efforts, and overuse of medicines such as antibiotics. The CEWG report called on WHO Member States to develop a global framework to improve monitoring, coordination and financing of R&D efforts through the establishment of a Global Health R&D Observatory and the negotiation of a binding treaty on R&D. While the treaty option has been put on the back-burner for several years, Member States nevertheless agreed at the 2013 World Health Assembly (WHA) on concrete steps towards a global framework. Progress at the 2013 WHA reaffirmed the central role of WHO as a convener, and the WHA's decision to create the Observatory within the WHO Secretariat underscored the organization's role as a source of strategic knowledge in the global health system. However, despite WHO's constitutional mandate as the 'directing and coordinating authority on international health work', in reality it faces major challenges in coordinating autonomous R&D actors such as states, firms and foundations in the global system. Strengthening its ability to do so requires, at a minimum, reforming its financing arrangements to provide it with a greater degree of

  13. 40 CFR 63.11396 - What are the standards and compliance requirements for new sources?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Modacrylic Fibers Production Area Sources Standards and Compliance Requirements § 63.11396 What are the... through a closed vent system to any combination of control devices meeting the requirements for process... (b)(1), (2), or (3) of this section for each fiber spinning line that uses a spin dope produced from...

  14. 40 CFR 63.11396 - What are the standards and compliance requirements for new sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Modacrylic Fibers Production Area Sources Standards and Compliance Requirements § 63.11396 What are the... through a closed vent system to any combination of control devices meeting the requirements for process... (b)(1), (2), or (3) of this section for each fiber spinning line that uses a spin dope produced from...

  15. Characterizing chronic and acute health risks of residues of veterinary drugs in food: latest methodological developments by the joint FAO/WHO expert committee on food additives.

    PubMed

    Boobis, Alan; Cerniglia, Carl; Chicoine, Alan; Fattori, Vittorio; Lipp, Markus; Reuss, Rainer; Verger, Philippe; Tritscher, Angelika

    2017-11-01

    The risk assessment of residues of veterinary drugs in food is a field that continues to evolve. The toxicological end-points to be considered are becoming more nuanced and in light of growing concern about the development of antimicrobial resistance, detailed analysis of the antimicrobial activity of the residues of veterinary drugs in food is increasingly incorporated in the assessment. In recent years, the Joint FAO/WHO Expert Committee on Food Additives (JECFA) has refined its approaches to provide a more comprehensive and fit-for-purpose risk assessment. This publication describes in detail the consideration of acute and chronic effects, the estimation of acute and chronic dietary exposure, current approaches for including microbiological endpoints in the risk assessment, and JECFA's considerations for the potential effects of food processing on residues from veterinary drugs. JECFA now applies these approaches in the development of health-based guidance values (i.e. safe exposure levels) for residues of veterinary drugs. JECFA, thus, comprehensively addresses acute and chronic risks by using corresponding estimates for acute and chronic exposure and suitable correction for the limited bioavailability of bound residues by the Gallo-Torres model. On a case-by-case basis, JECFA also considers degradation products that occur from normal food processing of food containing veterinary drug residues. These approaches will continue to be refined to ensure the most scientifically sound basis for the establishment of health-based guidance values for veterinary drug residues.

  16. Changing R&D models in research-based pharmaceutical companies.

    PubMed

    Schuhmacher, Alexander; Gassmann, Oliver; Hinder, Markus

    2016-04-27

    New drugs serving unmet medical needs are one of the key value drivers of research-based pharmaceutical companies. The efficiency of research and development (R&D), defined as the successful approval and launch of new medicines (output) in the rate of the monetary investments required for R&D (input), has declined since decades. We aimed to identify, analyze and describe the factors that impact the R&D efficiency. Based on publicly available information, we reviewed the R&D models of major research-based pharmaceutical companies and analyzed the key challenges and success factors of a sustainable R&D output. We calculated that the R&D efficiencies of major research-based pharmaceutical companies were in the range of USD 3.2-32.3 billion (2006-2014). As these numbers challenge the model of an innovation-driven pharmaceutical industry, we analyzed the concepts that companies are following to increase their R&D efficiencies: (A) Activities to reduce portfolio and project risk, (B) activities to reduce R&D costs, and (C) activities to increase the innovation potential. While category A comprises measures such as portfolio management and licensing, measures grouped in category B are outsourcing and risk-sharing in late-stage development. Companies made diverse steps to increase their innovation potential and open innovation, exemplified by open source, innovation centers, or crowdsourcing, plays a key role in doing so. In conclusion, research-based pharmaceutical companies need to be aware of the key factors, which impact the rate of innovation, R&D cost and probability of success. Depending on their company strategy and their R&D set-up they can opt for one of the following open innovators: knowledge creator, knowledge integrator or knowledge leverager.

  17. 44 CFR 63.16 - Review of State application by the Federal Insurance Administrator.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... determination as to the adequacy of the coastal zone management program and erosion rate data base. (b) Upon determining that the State's program and/or data base does not meet the criteria set forth in § 63.14, the... what respects the State program and/or data base fails to comply with the criteria. (c) Upon...

  18. 40 CFR 63.7910 - What emissions limitations and work practice standards must I meet for separators?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Separators § 63.7910 What emissions limitations and work practice standards must...

  19. 40 CFR 63.7910 - What emissions limitations and work practice standards must I meet for separators?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Separators § 63.7910 What emissions limitations and work practice standards must...

  20. 40 CFR 63.7910 - What emissions limitations and work practice standards must I meet for separators?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Separators § 63.7910 What emissions limitations and work practice standards must...

  1. 40 CFR 63.7910 - What emissions limitations and work practice standards must I meet for separators?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Separators § 63.7910 What emissions limitations and work practice standards must...

  2. 40 CFR 63.7910 - What emissions limitations and work practice standards must I meet for separators?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Separators § 63.7910 What emissions limitations and work practice standards must...

  3. U.S. Federal Investments in Energy R&D: 1961-2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dooley, James J.

    2008-10-10

    This paper documents nearly a half century of U.S. federal government support for energy research and development (R&D). Data on energy R&D expenditures disaggregated by major program area are presented here for the first time for the period 1961-2008. This paper also documents U.S. federal government spending on key large scale energy R&D programs that were initiated in response to the oil crisis of the 1970s. Since 1961, the U.S. government has invested nearly $172 billion (in inflation adjusted 2005 US dollars) for the development of advanced energy technologies and for the necessary underlying basic science. Over this period, nearlymore » 24% of the total federal investment in energy R&D occurred during the short seven-year span of 1974-1980. From 1977-1981, energy R&D investments briefly rose above 10% of all federal R&D; however, since the mid-1990s energy R&D has accounted for only about 1% of all federal R&D investments.« less

  4. 40 CFR 63.8000 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... atoms, and you use a combustion-based control device (excluding a flare) to meet an organic HAP emission... calculating the concentration of each organic compound that contains halogen atoms using the procedures specified in § 63.115(d)(2)(v), multiplying each concentration by the number of halogen atoms in the organic...

  5. 40 CFR 63.8000 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... atoms, and you use a combustion-based control device (excluding a flare) to meet an organic HAP emission... calculating the concentration of each organic compound that contains halogen atoms using the procedures specified in § 63.115(d)(2)(v), multiplying each concentration by the number of halogen atoms in the organic...

  6. 40 CFR 63.8000 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... atoms, and you use a combustion-based control device (excluding a flare) to meet an organic HAP emission... calculating the concentration of each organic compound that contains halogen atoms using the procedures specified in § 63.115(d)(2)(v), multiplying each concentration by the number of halogen atoms in the organic...

  7. 40 CFR 63.8000 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... atoms, and you use a combustion-based control device (excluding a flare) to meet an organic HAP emission... calculating the concentration of each organic compound that contains halogen atoms using the procedures specified in § 63.115(d)(2)(v), multiplying each concentration by the number of halogen atoms in the organic...

  8. 40 CFR 63.8000 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... atoms, and you use a combustion-based control device (excluding a flare) to meet an organic HAP emission... calculating the concentration of each organic compound that contains halogen atoms using the procedures specified in § 63.115(d)(2)(v), multiplying each concentration by the number of halogen atoms in the organic...

  9. 18 CFR 154.401 - RD&D expenditures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false RD&D expenditures. 154.401 Section 154.401 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... file to recover research, development, and demonstration (RD&D) expenditures in its rates under this...

  10. IBC's 23rd Annual Antibody Engineering, 10th Annual Antibody Therapeutics international conferences and the 2012 Annual Meeting of The Antibody Society: December 3-6, 2012, San Diego, CA.

    PubMed

    Klöhn, Peter-Christian; Wuellner, Ulrich; Zizlsperger, Nora; Zhou, Yu; Tavares, Daniel; Berger, Sven; Zettlitz, Kirstin A; Proetzel, Gabriele; Yong, May; Begent, Richard H J; Reichert, Janice M

    2013-01-01

    The 23rd Annual Antibody Engineering, 10th Annual Antibody Therapeutics international conferences, and the 2012 Annual Meeting of The Antibody Society, organized by IBC Life Sciences with contributions from The Antibody Society and two Scientific Advisory Boards, were held December 3-6, 2012 in San Diego, CA. The meeting drew over 800 participants who attended sessions on a wide variety of topics relevant to antibody research and development. As a prelude to the main events, a pre-conference workshop held on December 2, 2012 focused on intellectual property issues that impact antibody engineering. The Antibody Engineering Conference was composed of six sessions held December 3-5, 2012: (1) From Receptor Biology to Therapy; (2) Antibodies in a Complex Environment; (3) Antibody Targeted CNS Therapy: Beyond the Blood Brain Barrier; (4) Deep Sequencing in B Cell Biology and Antibody Libraries; (5) Systems Medicine in the Development of Antibody Therapies/Systematic Validation of Novel Antibody Targets; and (6) Antibody Activity and Animal Models. The Antibody Therapeutics conference comprised four sessions held December 4-5, 2012: (1) Clinical and Preclinical Updates of Antibody-Drug Conjugates; (2) Multifunctional Antibodies and Antibody Combinations: Clinical Focus; (3) Development Status of Immunomodulatory Therapeutic Antibodies; and (4) Modulating the Half-Life of Antibody Therapeutics. The Antibody Society's special session on applications for recording and sharing data based on GIATE was held on December 5, 2012, and the conferences concluded with two combined sessions on December 5-6, 2012: (1) Development Status of Early Stage Therapeutic Antibodies; and (2) Immunomodulatory Antibodies for Cancer Therapy.

  11. Neutron and X-ray Studies of Advanced Materials VII Symposium at the 143rd TMS Annual Meeting & Exhibition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spanos, George

    2015-02-05

    The Neutron and X-Ray Studies of Advanced Materials VII Symposium, held at the 2014, 143rd Annual Meeting of The Minerals, Metals, and Materials Society (TMS), brought together experts, young investigators, and students from this sub-discipline of materials science in order for them to share their latest discoveries and develop collaborations. This annual symposium, which is organized by The Minerals, Metals, and Materials Society, is an important event for this community of scientists. This year, over 100 high-level technical talks were delivered over the course of the four day event. In addition, the large number of students and young investigators inmore » attendance ensured the maximum benefit to the next generation’s work force in this area of study. The science surrounding the utilization of neutrons and x-rays to study advanced materials is becoming increasingly important in increasing the understanding of how the exceptional materials properties of such materials arise. In particular, x-rays and neutrons can be used to visualize material structures at an extremely high resolution and in some cases, three dimensions—allowing unprecedented insights into the mechanisms governing certain materials properties such as strength and toughness. Moreover, some of these techniques allow materials to be visualized without damaging the material, approaches known as non-destructive evaluation or “NDE”. This allows materials to be studied in 3 dimensions while undergoing change in real time which represents an important (and long sought-after) advancement in materials science. The types of interactions afforded by this event are beneficial to society at large primarily because they provide opportunities for the leaders within this field to learn from one another and thus improve the quality and productivity of their investigations. Additionally, the presence of young investigators and students with technical interests in this field provides promise that the

  12. 10 CFR 1045.9 - RD classification performance evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Program Management of the Restricted Data and Formerly Restricted Data Classification System § 1045.9 RD classification performance evaluation. (a) Heads of agencies shall ensure that RD management officials and those...

  13. Results from the UK 3rd generation programme: Albion

    NASA Astrophysics Data System (ADS)

    McEwen, R. K.; Axcell, C.; Knowles, P.; Hoade, K. P.; Wilson, M.; Dennis, P. N. J.; Backhouse, P.; Gordon, N. T.

    2008-10-01

    Following the development of 1st Generation systems in the 1970s, thermal imaging has been in service with the UK armed forces for over 25 years and has proven itself to be a battle winning technology. More recently the wider accessibility to similar technologies within opposing forces has reduced the military advantage provided by these 1st Generation systems and a clear requirement has been identified by the UK MOD for thermal imaging sensors providing increased detection, recognition and identification (DRI) ranges together with a simplified logistical deployment burden and reduced through-life costs. In late 2005, the UK MOD initiated a programme known as "Albion" to develop high performance 3rd Generation single waveband infrared detectors to meet this requirement. At the same time, under a separate programme supporting higher risk technology, a dual waveband infrared detector was also developed. The development phase of the Albion programme has now been completed and prototype detectors are now available and have been integrated into demonstration thermal imaging cameras. The Albion programme has now progressed into the second phase, incorporating both single and dual waveband devices, focussing on low rate initial production (LRIP) and qualification of the devices for military applications. All of the detectors have been fabricated using cadmium mercury telluride material (CMT), grown by metal organic vapour phase epitaxy (MOVPE) on low cost, gallium arsenide (GaAs) substrates and bump bonded to the silicon read out circuit (ROIC). This paper discusses the design features of the 3rd Generation detectors developed in the UK together with the results obtained from the prototype devices both in the laboratory and when integrated into field deployable thermal imaging cameras.

  14. 40 CFR 63.1312 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....111) Owner or operator (§ 63.2) Performance evaluation (§ 63.2) Performance test (§ 63.2) Permitting...-up, shutdown, and malfunction plan (§ 63.101) State (§ 63.2) Stationary Source (§ 63.2) Surge control vessel (§ 63.161) Temperature monitoring device (§ 63.111) Test method (§ 63.2) Treatment process (§ 63...

  15. 40 CFR 63.1312 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....111) Owner or operator (§ 63.2) Performance evaluation (§ 63.2) Performance test (§ 63.2) Permitting...) Research and development facility (§ 63.101) Routed to a process or route to a process (§ 63.161) Run (§ 63... vessel (§ 63.161) Temperature monitoring device (§ 63.111) Test method (§ 63.2) Treatment process (§ 63...

  16. The analysis of market knowledge competence effect and research & development (R&D) toward the policy making of new product development

    NASA Astrophysics Data System (ADS)

    Purwanggono, Bambang; Sesuko, Agung; Budiawan, Wiwik

    2017-11-01

    The increasing mobility of people without adequate provision of mass transportation infrastructures makes people choose private transportation like motorcycles. Such circumstances lead the motorcycle manufacturers in Indonesia competing to develop their products to meet the needs of customers. In addition, the new regulation of Central Bank of Indonesia dealing with the credit advances has raised the intense competition of motorcycles industries in Indonesia. One of the ways to win the competition is by developing new and improved products. In developing and improving the products, companies need to consider resource utilization. In this research, researcher utilizes the resources that exist both inside and outside the enterprise such as customer demands, intensity of competition, perception of the importance of market knowledge, importance of market competence, and internal R&D as well as external R&D is expected to develop new products that are superior. The study involved 150 employees as respondents. The method used in the study is Structural Equation Modeling (SEM) with AMOS 20.0 statistical software. The result shows that the demands of the customers and the intensity of competition lead to a positive effect on market knowledge competence, while the perception of the market knowledge importance does not influence the development of new products, and market knowledge competence, internal R&D and external R&D have positive effect on the development of new products.

  17. Nuclear Engineering Computer Modules: Reactor Dynamics, RD-1 and RD-2.

    ERIC Educational Resources Information Center

    Onega, Ronald J.

    The objective of the Reactor Dynamics Module, RD-1, is to obtain the kinetics equation without feedback and solve the kinetics equations numerically for one to six delayed neutron groups for time varying reactivity insertions. The computer code FUMOKI (Fundamental Mode Kinetics) will calculate the power as a function of time for either uranium or…

  18. 40 CFR 63.1446 - What alternative emission limitation may I meet for my combined gas streams?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... than a baghouse or venturi wet scrubber applied to meet any total particulate matter emission limit in... than 5 percent of the total operating time in any semiannual reporting period. (d) For each venturi wet scrubber applied to meet any total particulate matter emission limit in paragraph (b) of this section, you...

  19. 40 CFR 63.1312 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins § 63.1312 Definitions. (a) The... (§ 63.111) Owner or operator (§ 63.2) Performance evaluation (§ 63.2) Performance test (§ 63.2... gravity monitoring device (§ 63.111) State (§ 63.2) Stationary Source (§ 63.2) Surge control vessel (§ 63...

  20. Digest of Papers: Forty-Eighth Annual Meeting of American Orthopsychiatric Association (Washington, D.C., March 21-24, 1971)

    ERIC Educational Resources Information Center

    Eisenberg, Leon, Ed.

    1971-01-01

    The entire journal contains summaries of topics and papers delivered at the Annual Meeting of American Orthopsychiatry (48th, March 21-24, 1971, Washington, D.C.). Author, title, and session indexes are provided. (RD)

  1. 40 CFR 63.7294 - What work practice standard must I meet for soaking?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing... standard must I meet for soaking? (a) For each new and existing by-product coke oven battery, you must... from raw coke oven gas leaking from the collecting main through the damper, and emissions that result...

  2. 40 CFR 63.1312 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Surge control vessel (§ 63.161) Temperature monitoring device (§ 63.111) Test method (§ 63.2) Treatment... Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins § 63.1312 Definitions. (a) The... (§ 63.111) Owner or operator (§ 63.2) Performance evaluation (§ 63.2) Performance test (§ 63.2...

  3. 40 CFR 63.7294 - What work practice standard must I meet for soaking?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... prepare and operate at all times according to a written work practice plan for soaking. Each plan must... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What work practice standard must I meet... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  4. R&D Nuggets

    Science.gov Websites

    Origin of the Chemical Elements and Their Discoveries [added 1/2007] National Laboratories and Other to the content of DOE R&D Accomplishments. Celebrating Einstein - series of articles about Albert Einstein and his work [added 3/2005] Compact Portable Electric Power Sources [added 1/2007] History of the

  5. 2nd & 3rd Generation Vehicle Subsystems

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This paper contains viewgraph presentation on the "2nd & 3rd Generation Vehicle Subsystems" project. The objective behind this project is to design, develop and test advanced avionics, power systems, power control and distribution components and subsystems for insertion into a highly reliable and low-cost system for a Reusable Launch Vehicles (RLV). The project is divided into two sections: 3rd Generation Vehicle Subsystems and 2nd Generation Vehicle Subsystems. The following topics are discussed under the first section, 3rd Generation Vehicle Subsystems: supporting the NASA RLV program; high-performance guidance & control adaptation for future RLVs; Evolvable Hardware (EHW) for 3rd generation avionics description; Scaleable, Fault-tolerant Intelligent Network or X(trans)ducers (SFINIX); advance electric actuation devices and subsystem technology; hybrid power sources and regeneration technology for electric actuators; and intelligent internal thermal control. Topics discussed in the 2nd Generation Vehicle Subsystems program include: design, development and test of a robust, low-maintenance avionics with no active cooling requirements and autonomous rendezvous and docking systems; design and development of a low maintenance, high reliability, intelligent power systems (fuel cells and battery); and design of a low cost, low maintenance high horsepower actuation systems (actuators).

  6. 40 CFR 63.7915 - What emissions limitations and work practice standards must I meet for transfer systems?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Transfer Systems § 63.7915 What emissions limitations and work practice...

  7. 40 CFR 63.7905 - What emissions limitations or work practice standards must I meet for surface impoundments?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Surface Impoundments § 63.7905 What emissions limitations or work practice...

  8. 40 CFR 63.7905 - What emissions limitations or work practice standards must I meet for surface impoundments?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Surface Impoundments § 63.7905 What emissions limitations or work practice...

  9. 40 CFR 63.7915 - What emissions limitations and work practice standards must I meet for transfer systems?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Transfer Systems § 63.7915 What emissions limitations and work practice...

  10. 40 CFR 63.7915 - What emissions limitations and work practice standards must I meet for transfer systems?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Transfer Systems § 63.7915 What emissions limitations and work practice...

  11. 40 CFR 63.7905 - What emissions limitations or work practice standards must I meet for surface impoundments?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Surface Impoundments § 63.7905 What emissions limitations or work practice...

  12. 40 CFR 63.7915 - What emissions limitations and work practice standards must I meet for transfer systems?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Transfer Systems § 63.7915 What emissions limitations and work practice...

  13. 40 CFR 63.7905 - What emissions limitations or work practice standards must I meet for surface impoundments?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Surface Impoundments § 63.7905 What emissions limitations or work practice...

  14. 40 CFR 63.7915 - What emissions limitations and work practice standards must I meet for transfer systems?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Transfer Systems § 63.7915 What emissions limitations and work practice...

  15. 40 CFR 63.7905 - What emissions limitations or work practice standards must I meet for surface impoundments?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Surface Impoundments § 63.7905 What emissions limitations or work practice...

  16. 78 FR 20167 - 33rd Meeting: RTCA Special Committee 206, Aeronautical Information and Meteorological Data Link...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ... Other Business Sub-Groups meetings Break out, as necessary daily EDR Turbulence Standards Project Briefing from FAA SE2020 Team SG6 WG1 Architecture and MASPS presentations SG3 AIS and MET Services Delivery Architecture Recommendations Document Review (FRAC release approval). Closing Plenary--Sub-Groups...

  17. Design of a Personnel and Training Information System for Educational R&D Personnel. The Domain of R&D Training Resources.

    ERIC Educational Resources Information Center

    Hood, Paul D.

    This document reports an attempt to examine the content and structure of the domain of research and development (R&D) training resources. The project began by locating instructional materials within a larger matrix that classified R&D resources by structure (primary/secondary, oral/written, documentary/non-document) and level of formalization…

  18. Transcriptional regulation of ABI3- and ABA-responsive genes including RD29B and RD29A in seeds, germinating embryos, and seedlings of Arabidopsis.

    PubMed

    Nakashima, Kazuo; Fujita, Yasunari; Katsura, Koji; Maruyama, Kyonoshin; Narusaka, Yoshihiro; Seki, Motoaki; Shinozaki, Kazuo; Yamaguchi-Shinozaki, Kazuko

    2006-01-01

    ABA-responsive elements (ABREs) are cis-acting elements and basic leucine zipper (bZIP)-type ABRE-binding proteins (AREBs) are transcriptional activators that function in the expression of RD29B in vegetative tissue of Arabidopsis in response to abscisic acid (ABA) treatment. Dehydration-responsive elements (DREs) function as coupling elements of ABRE in the expression of RD29A in response to ABA. Expression analysis using abi3 and abi5 mutants showed that ABI3 and ABI5 play important roles in the expression of RD29B in seeds. Base-substitution analysis showed that two ABREs function strongly and one ABRE coupled with DRE functions weakly in the expression of RD29A in embryos. In a transient transactivation experiment, ABI3, ABI5 and AREB1 activated transcription of a GUS reporter gene driven by the RD29B promoter strongly but these proteins activated the transcription driven by the RD29A promoter weakly. In 35S::ABI3 Arabidopsis plants, the expression of RD29B was up-regulated strongly, but that of RD29A was up-regulated weakly. These results indicate that the expression of RD29B having ABREs in the promoter is up-regulated strongly by ABI3, whereas that of RD29A having one ABRE coupled with DREs in the promoter is up-regulated weakly by ABI3. We compared the expression of 7000 Arabidopsis genes in response to ABA treatment during germination and in the vegetative growth stage, and that in 35S::ABI3 plants using a full-length cDNA microarray. The expression of ABI3- and/or ABA-responsive genes and cis-elements in the promoters are discussed.

  19. 40 CFR 63.1312 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Hazardous Air Pollutant Emissions: Group IV Polymers and Resins § 63.1312 Definitions. (a) The following....111) Owner or operator (§ 63.2) Performance evaluation (§ 63.2) Performance test (§ 63.2) Permitting...-up, shutdown, and malfunction plan (§ 63.101) State (§ 63.2) Stationary Source (§ 63.2) Surge control...

  20. Office of Operations R&D

    DOT National Transportation Integrated Search

    2013-04-30

    The Office of Operations Research and Development (R&D) produces technology and tools to improve transportation system productivity, efficiency, and performance by proactively anticipating congestion and managing traffic.

  1. 40 CFR 63.7920 - What emissions limitations and work practice standards must I meet for equipment leaks?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Equipment Leaks § 63.7920 What emissions limitations and work practice standards...

  2. 40 CFR 63.7920 - What emissions limitations and work practice standards must I meet for equipment leaks?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Equipment Leaks § 63.7920 What emissions limitations and work practice standards...

  3. 40 CFR 63.7920 - What emissions limitations and work practice standards must I meet for equipment leaks?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Equipment Leaks § 63.7920 What emissions limitations and work practice standards...

  4. 40 CFR 63.7890 - What emissions limitations and work practice standards must I meet for process vents?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Process Vents § 63.7890 What emissions limitations and work practice standards...

  5. 40 CFR 63.7890 - What emissions limitations and work practice standards must I meet for process vents?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Process Vents § 63.7890 What emissions limitations and work practice standards...

  6. 40 CFR 63.7890 - What emissions limitations and work practice standards must I meet for process vents?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Process Vents § 63.7890 What emissions limitations and work practice standards...

  7. 40 CFR 63.7920 - What emissions limitations and work practice standards must I meet for equipment leaks?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Equipment Leaks § 63.7920 What emissions limitations and work practice standards...

  8. 40 CFR 63.7890 - What emissions limitations and work practice standards must I meet for process vents?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Process Vents § 63.7890 What emissions limitations and work practice standards...

  9. 40 CFR 63.7920 - What emissions limitations and work practice standards must I meet for equipment leaks?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Equipment Leaks § 63.7920 What emissions limitations and work practice standards...

  10. Developing R&D portfolio business validity simulation model and system.

    PubMed

    Yeo, Hyun Jin; Im, Kwang Hyuk

    2015-01-01

    The R&D has been recognized as critical method to take competitiveness by not only companies but also nations with its value creation such as patent value and new product. Therefore, R&D has been a decision maker's burden in that it is hard to decide how much money to invest, how long time one should spend, and what technology to develop which means it accompanies resources such as budget, time, and manpower. Although there are diverse researches about R&D evaluation, business factors are not concerned enough because almost all previous studies are technology oriented evaluation with one R&D technology based. In that, we early proposed R&D business aspect evaluation model which consists of nine business model components. In this research, we develop a simulation model and system evaluating a company or industry's R&D portfolio with business model point of view and clarify default and control parameters to facilitate evaluator's business validity work in each evaluation module by integrate to one screen.

  11. PREFACE: Selected contributions from the 3rd Theory Meets Industry International Workshop, TMI2009 (Nagoya, Japan, 11-13 November 2009) Selected contributions from the 3rd Theory Meets Industry International Workshop, TMI2009 (Nagoya, Japan, 11-13 November 2009)

    NASA Astrophysics Data System (ADS)

    Tanaka, Isao; Hafner, Jürgen; Wimmer, Erich; Asahi, Ryoji

    2010-09-01

    The structures, physicochemical and thermodynamic properties of materials are becoming increasingly amenable to treatment by first-principles (ab initio) quantum mechanical simulations. Calculations containing a few hundred atoms are now routine, thanks to improvements in computer technology and computational techniques. Schemes to determine electronic structures more accurately and to treat more complex systems continue to be developed. A growing number of scientists and engineers are becoming aware of the power of these approaches. By applying these new computational tools, materials science and technology is expected to enter a new era of accelerated progress and efficiency. In 1998 the first workshop entitled 'Theory Meets Industry' (TMI) was held at the Vienna University of Technology. The aim of the workshop was to direct the potential of the ab initio simulation codes developed in academia towards the necessities arising from industrial research. Over the next decade, significant advances in ab initio methodology and its application to academic and industrial research were achieved. It was thus considered timely to hold a second TMI workshop in 2007, again in Vienna. The contributions from academia concentrated on a wide range of new developments in ab initio simulations, as well as on applications at the forefront of materials research. Speakers from the industrial sector also emphasized the progress made in successfully applying ab initiotechniques to key areas of modern technology. The proceedings were published in Journal of Physics: Condensed Matter as a special issue (volume 20, number 6, 2008), which was included in the 'Top papers 2008 showcase' of that journal. Following the notable success of the first two workshops, it was decided that the third TMI workshop would be held outside Europe. Holding the workshop in Japan was intended to increase awareness of theoretical materials science and foster further international collaboration in this field

  12. Summary of findings of the R&D committee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kenley, C.R.; Kokenge, B.R.

    1996-05-01

    In March 1995, the Department of Energy`s (DOE) Nuclear Materials Stabilization Task Group (NMST) chartered a committee to formulate a research and development (R&D) plan in response to Sub-recommendation (2) of Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The NMSTG was established as an organizational unit operating under the auspices of the DOE Office of the Environmental Management. As a result of its efforts, the Research Committee concluded that, in general, the technology needs for stabilizing 94-1 nuclear materials are being adequately met by existing or planned DOE programs. At the same time, the committee, in the form ofmore » recommendations, noted specific R&D program areas that should be addressed by the NMSTG. These recommendations are documented in the R&D plan and formulated based on: (1) existing {open_quotes}gaps{close_quotes} in DOE`s R&D stabilization program, (2) the relative maturity of various technologies, and (3) other important R&D program issues that, in the judgement of the committee, should be addressed by the NMSTG. A systems engineering approach, derived form the aerospace industry, was applied to the various stabilization technologies to assess their relative maturity and availability for use in treating 94-1 nuclear materials.« less

  13. Federal R&D Funding by Budget Function. Fiscal Years 1983-85.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC. Div. of Science Resources Studies.

    This report provides a distribution of research and development (R&D) programs by the functions of the federal budget. It includes only federal conduct of R&D programs, with R&D plant and all non-R&D activities excluded. The sections of the report are presented in descending order of R&D budget authority for the various…

  14. 423rd Brookhaven Lecture

    ScienceCinema

    Mei Bai

    2017-12-09

    Among other things, scientists at BNL's Relativistic Heavy Ion Collider (RHIC) are studying a fundamental question of particle physics: What is responsible for proton "spin"? Physicist Mei Bai discusses this topic at the 423rd Brookhaven Lecture, "RHIC: The Worlds First High-Energy, Polarized-Proton Collider."

  15. 40 CFR 63.5755 - How do I demonstrate compliance with the aluminum recreational boat surface coating spray gun...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the aluminum recreational boat surface coating spray gun cleaning work practice standards? 63.5755... recreational boat surface coating spray gun cleaning work practice standards? You must demonstrate compliance with the aluminum coating spray gun cleaning work practice standards by meeting the requirements of...

  16. 40 CFR 63.5755 - How do I demonstrate compliance with the aluminum recreational boat surface coating spray gun...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the aluminum recreational boat surface coating spray gun cleaning work practice standards? 63.5755... recreational boat surface coating spray gun cleaning work practice standards? You must demonstrate compliance with the aluminum coating spray gun cleaning work practice standards by meeting the requirements of...

  17. 40 CFR 63.5755 - How do I demonstrate compliance with the aluminum recreational boat surface coating spray gun...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the aluminum recreational boat surface coating spray gun cleaning work practice standards? 63.5755... recreational boat surface coating spray gun cleaning work practice standards? You must demonstrate compliance with the aluminum coating spray gun cleaning work practice standards by meeting the requirements of...

  18. 40 CFR 63.7900 - What emissions limitations and work practice standards must I meet for containers?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Containers § 63.7900 What emissions limitations and work practice standards must... your container except at the times the container is used for treatment of remediation material by a...

  19. 40 CFR 63.7900 - What emissions limitations and work practice standards must I meet for containers?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Containers § 63.7900 What emissions limitations and work practice standards must... your container except at the times the container is used for treatment of remediation material by a...

  20. 40 CFR 63.7900 - What emissions limitations and work practice standards must I meet for containers?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... Pollutants: Site Remediation Containers § 63.7900 What emissions limitations and work practice standards must... your container except at the times the container is used for treatment of remediation material by a...