Sample records for job-shop scheduling problem

  1. Performance comparison of some evolutionary algorithms on job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Mishra, S. K.; Rao, C. S. P.

    2016-09-01

    Job Shop Scheduling as a state space search problem belonging to NP-hard category due to its complexity and combinational explosion of states. Several naturally inspire evolutionary methods have been developed to solve Job Shop Scheduling Problems. In this paper the evolutionary methods namely Particles Swarm Optimization, Artificial Intelligence, Invasive Weed Optimization, Bacterial Foraging Optimization, Music Based Harmony Search Algorithms are applied and find tuned to model and solve Job Shop Scheduling Problems. To compare about 250 Bench Mark instances have been used to evaluate the performance of these algorithms. The capabilities of each these algorithms in solving Job Shop Scheduling Problems are outlined.

  2. Job shop scheduling problem with late work criterion

    NASA Astrophysics Data System (ADS)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  3. Sensibility study in a flexible job shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Curralo, Ana; Pereira, Ana I.; Barbosa, José; Leitão, Paulo

    2013-10-01

    This paper proposes the impact assessment of the jobs order in the optimal time of operations in a Flexible Job Shop Scheduling Problem. In this work a real assembly cell was studied: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France, which is considered as a Flexible Job Shop problem. The problem consists in finding the machines operations schedule, taking into account the precedence constraints. The main objective is to minimize the batch makespan, i.e. the finish time of the last operation completed in the schedule. Shortly, the present study consists in evaluating if the jobs order affects the optimal time of the operations schedule. The genetic algorithm was used to solve the optimization problem. As a conclusion, it's assessed that the jobs order influence the optimal time.

  4. Solving multi-objective job shop scheduling problems using a non-dominated sorting genetic algorithm

    NASA Astrophysics Data System (ADS)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    The efforts of finding optimal schedules for the job shop scheduling problems are highly important for many real-world industrial applications. In this paper, a multi-objective based job shop scheduling problem by simultaneously minimizing makespan and tardiness is taken into account. The problem is considered to be more complex due to the multiple business criteria that must be satisfied. To solve the problem more efficiently and to obtain a set of non-dominated solutions, a meta-heuristic based non-dominated sorting genetic algorithm is presented. In addition, task based representation is used for solution encoding, and tournament selection that is based on rank and crowding distance is applied for offspring selection. Swapping and insertion mutations are employed to increase diversity of population and to perform intensive search. To evaluate the modified non-dominated sorting genetic algorithm, a set of modified benchmarking job shop problems obtained from the OR-Library is used, and the results are considered based on the number of non-dominated solutions and quality of schedules obtained by the algorithm.

  5. Innately Split Model for Job-shop Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Ikeda, Kokolo; Kobayashi, Sigenobu

    Job-shop Scheduling Problem (JSP) is one of the most difficult benchmark problems. GA approaches often fail searching the global optimum because of the deception UV-structure of JSPs. In this paper, we introduce a novel framework model of GA, Innately Split Model (ISM) which prevents UV-phenomenon, and discuss on its power particularly. Next we analyze the structure of JSPs with the help of the UV-structure hypothesys, and finally we show ISM's excellent performance on JSP.

  6. Active Solution Space and Search on Job-shop Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Watanabe, Masato; Ida, Kenichi; Gen, Mitsuo

    In this paper we propose a new searching method of Genetic Algorithm for Job-shop scheduling problem (JSP). The coding method that represent job number in order to decide a priority to arrange a job to Gannt Chart (called the ordinal representation with a priority) in JSP, an active schedule is created by using left shift. We define an active solution at first. It is solution which can create an active schedule without using left shift, and set of its defined an active solution space. Next, we propose an algorithm named Genetic Algorithm with active solution space search (GA-asol) which can create an active solution while solution is evaluated, in order to search the active solution space effectively. We applied it for some benchmark problems to compare with other method. The experimental results show good performance.

  7. A novel discrete PSO algorithm for solving job shop scheduling problem to minimize makespan

    NASA Astrophysics Data System (ADS)

    Rameshkumar, K.; Rajendran, C.

    2018-02-01

    In this work, a discrete version of PSO algorithm is proposed to minimize the makespan of a job-shop. A novel schedule builder has been utilized to generate active schedules. The discrete PSO is tested using well known benchmark problems available in the literature. The solution produced by the proposed algorithms is compared with best known solution published in the literature and also compared with hybrid particle swarm algorithm and variable neighborhood search PSO algorithm. The solution construction methodology adopted in this study is found to be effective in producing good quality solutions for the various benchmark job-shop scheduling problems.

  8. Solving Open Job-Shop Scheduling Problems by SAT Encoding

    NASA Astrophysics Data System (ADS)

    Koshimura, Miyuki; Nabeshima, Hidetomo; Fujita, Hiroshi; Hasegawa, Ryuzo

    This paper tries to solve open Job-Shop Scheduling Problems (JSSP) by translating them into Boolean Satisfiability Testing Problems (SAT). The encoding method is essentially the same as the one proposed by Crawford and Baker. The open problems are ABZ8, ABZ9, YN1, YN2, YN3, and YN4. We proved that the best known upper bounds 678 of ABZ9 and 884 of YN1 are indeed optimal. We also improved the upper bound of YN2 and lower bounds of ABZ8, YN2, YN3 and YN4.

  9. Skipping Strategy (SS) for Initial Population of Job-Shop Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Abdolrazzagh-Nezhad, M.; Nababan, E. B.; Sarim, H. M.

    2018-03-01

    Initial population in job-shop scheduling problem (JSSP) is an essential step to obtain near optimal solution. Techniques used to solve JSSP are computationally demanding. Skipping strategy (SS) is employed to acquire initial population after sequence of job on machine and sequence of operations (expressed in Plates-jobs and mPlates-jobs) are determined. The proposed technique is applied to benchmark datasets and the results are compared to that of other initialization techniques. It is shown that the initial population obtained from the SS approach could generate optimal solution.

  10. Longest jobs first algorithm in solving job shop scheduling using adaptive genetic algorithm (GA)

    NASA Astrophysics Data System (ADS)

    Alizadeh Sahzabi, Vahid; Karimi, Iman; Alizadeh Sahzabi, Navid; Mamaani Barnaghi, Peiman

    2012-01-01

    In this paper, genetic algorithm was used to solve job shop scheduling problems. One example discussed in JSSP (Job Shop Scheduling Problem) and I described how we can solve such these problems by genetic algorithm. The goal in JSSP is to gain the shortest process time. Furthermore I proposed a method to obtain best performance on performing all jobs in shortest time. The method mainly, is according to Genetic algorithm (GA) and crossing over between parents always follows the rule which the longest process is at the first in the job queue. In the other word chromosomes is suggested to sorts based on the longest processes to shortest i.e. "longest job first" says firstly look which machine contains most processing time during its performing all its jobs and that is the bottleneck. Secondly, start sort those jobs which are belonging to that specific machine descending. Based on the achieved results," longest jobs first" is the optimized status in job shop scheduling problems. In our results the accuracy would grow up to 94.7% for total processing time and the method improved 4% the accuracy of performing all jobs in the presented example.

  11. Multiagent scheduling method with earliness and tardiness objectives in flexible job shops.

    PubMed

    Wu, Zuobao; Weng, Michael X

    2005-04-01

    Flexible job-shop scheduling problems are an important extension of the classical job-shop scheduling problems and present additional complexity. Such problems are mainly due to the existence of a considerable amount of overlapping capacities with modern machines. Classical scheduling methods are generally incapable of addressing such capacity overlapping. We propose a multiagent scheduling method with job earliness and tardiness objectives in a flexible job-shop environment. The earliness and tardiness objectives are consistent with the just-in-time production philosophy which has attracted significant attention in both industry and academic community. A new job-routing and sequencing mechanism is proposed. In this mechanism, two kinds of jobs are defined to distinguish jobs with one operation left from jobs with more than one operation left. Different criteria are proposed to route these two kinds of jobs. Job sequencing enables to hold a job that may be completed too early. Two heuristic algorithms for job sequencing are developed to deal with these two kinds of jobs. The computational experiments show that the proposed multiagent scheduling method significantly outperforms the existing scheduling methods in the literature. In addition, the proposed method is quite fast. In fact, the simulation time to find a complete schedule with over 2000 jobs on ten machines is less than 1.5 min.

  12. A hybrid job-shop scheduling system

    NASA Technical Reports Server (NTRS)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  13. A modified genetic algorithm with fuzzy roulette wheel selection for job-shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Thammano, Arit; Teekeng, Wannaporn

    2015-05-01

    The job-shop scheduling problem is one of the most difficult production planning problems. Since it is in the NP-hard class, a recent trend in solving the job-shop scheduling problem is shifting towards the use of heuristic and metaheuristic algorithms. This paper proposes a novel metaheuristic algorithm, which is a modification of the genetic algorithm. This proposed algorithm introduces two new concepts to the standard genetic algorithm: (1) fuzzy roulette wheel selection and (2) the mutation operation with tabu list. The proposed algorithm has been evaluated and compared with several state-of-the-art algorithms in the literature. The experimental results on 53 JSSPs show that the proposed algorithm is very effective in solving the combinatorial optimization problems. It outperforms all state-of-the-art algorithms on all benchmark problems in terms of the ability to achieve the optimal solution and the computational time.

  14. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  15. Extended precedence preservative crossover for job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Ong, Chung Sin; Moin, Noor Hasnah; Omar, Mohd

    2013-04-01

    Job shop scheduling problems (JSSP) is one of difficult combinatorial scheduling problems. A wide range of genetic algorithms based on the two parents crossover have been applied to solve the problem but multi parents (more than two parents) crossover in solving the JSSP is still lacking. This paper proposes the extended precedence preservative crossover (EPPX) which uses multi parents for recombination in the genetic algorithms. EPPX is a variation of the precedence preservative crossover (PPX) which is one of the crossovers that perform well to find the solutions for the JSSP. EPPX is based on a vector to determine the gene selected in recombination for the next generation. Legalization of children (offspring) can be eliminated due to the JSSP representation encoded by using permutation with repetition that guarantees the feasibility of chromosomes. The simulations are performed on a set of benchmarks from the literatures and the results are compared to ensure the sustainability of multi parents recombination in solving the JSSP.

  16. Neighbourhood generation mechanism applied in simulated annealing to job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Cruz-Chávez, Marco Antonio

    2015-11-01

    This paper presents a neighbourhood generation mechanism for the job shop scheduling problems (JSSPs). In order to obtain a feasible neighbour with the generation mechanism, it is only necessary to generate a permutation of an adjacent pair of operations in a scheduling of the JSSP. If there is no slack time between the adjacent pair of operations that is permuted, then it is proven, through theory and experimentation, that the new neighbour (schedule) generated is feasible. It is demonstrated that the neighbourhood generation mechanism is very efficient and effective in a simulated annealing.

  17. Energy-efficient approach to minimizing the energy consumption in an extended job-shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Tang, Dunbing; Dai, Min

    2015-09-01

    The traditional production planning and scheduling problems consider performance indicators like time, cost and quality as optimization objectives in manufacturing processes. However, environmentally-friendly factors like energy consumption of production have not been completely taken into consideration. Against this background, this paper addresses an approach to modify a given schedule generated by a production planning and scheduling system in a job shop floor, where machine tools can work at different cutting speeds. It can adjust the cutting speeds of the operations while keeping the original assignment and processing sequence of operations of each job fixed in order to obtain energy savings. First, the proposed approach, based on a mixed integer programming mathematical model, changes the total idle time of the given schedule to minimize energy consumption in the job shop floor while accepting the optimal solution of the scheduling objective, makespan. Then, a genetic-simulated annealing algorithm is used to explore the optimal solution due to the fact that the problem is strongly NP-hard. Finally, the effectiveness of the approach is performed smalland large-size instances, respectively. The experimental results show that the approach can save 5%-10% of the average energy consumption while accepting the optimal solution of the makespan in small-size instances. In addition, the average maximum energy saving ratio can reach to 13%. And it can save approximately 1%-4% of the average energy consumption and approximately 2.4% of the average maximum energy while accepting the near-optimal solution of the makespan in large-size instances. The proposed research provides an interesting point to explore an energy-aware schedule optimization for a traditional production planning and scheduling problem.

  18. Scheduling job shop - A case study

    NASA Astrophysics Data System (ADS)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  19. A neural network approach to job-shop scheduling.

    PubMed

    Zhou, D N; Cherkassky, V; Baldwin, T R; Olson, D E

    1991-01-01

    A novel analog computational network is presented for solving NP-complete constraint satisfaction problems, i.e. job-shop scheduling. In contrast to most neural approaches to combinatorial optimization based on quadratic energy cost function, the authors propose to use linear cost functions. As a result, the network complexity (number of neurons and the number of resistive interconnections) grows only linearly with problem size, and large-scale implementations become possible. The proposed approach is related to the linear programming network described by D.W. Tank and J.J. Hopfield (1985), which also uses a linear cost function for a simple optimization problem. It is shown how to map a difficult constraint-satisfaction problem onto a simple neural net in which the number of neural processors equals the number of subjobs (operations) and the number of interconnections grows linearly with the total number of operations. Simulations show that the authors' approach produces better solutions than existing neural approaches to job-shop scheduling, i.e. the traveling salesman problem-type Hopfield approach and integer linear programming approach of J.P.S. Foo and Y. Takefuji (1988), in terms of the quality of the solution and the network complexity.

  20. An Extended Deterministic Dendritic Cell Algorithm for Dynamic Job Shop Scheduling

    NASA Astrophysics Data System (ADS)

    Qiu, X. N.; Lau, H. Y. K.

    The problem of job shop scheduling in a dynamic environment where random perturbation exists in the system is studied. In this paper, an extended deterministic Dendritic Cell Algorithm (dDCA) is proposed to solve such a dynamic Job Shop Scheduling Problem (JSSP) where unexpected events occurred randomly. This algorithm is designed based on dDCA and makes improvements by considering all types of signals and the magnitude of the output values. To evaluate this algorithm, ten benchmark problems are chosen and different kinds of disturbances are injected randomly. The results show that the algorithm performs competitively as it is capable of triggering the rescheduling process optimally with much less run time for deciding the rescheduling action. As such, the proposed algorithm is able to minimize the rescheduling times under the defined objective and to keep the scheduling process stable and efficient.

  1. Better approximation guarantees for job-shop scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goldberg, L.A.; Paterson, M.; Srinivasan, A.

    1997-06-01

    Job-shop scheduling is a classical NP-hard problem. Shmoys, Stein & Wein presented the first polynomial-time approximation algorithm for this problem that has a good (polylogarithmic) approximation guarantee. We improve the approximation guarantee of their work, and present further improvements for some important NP-hard special cases of this problem (e.g., in the preemptive case where machines can suspend work on operations and later resume). We also present NC algorithms with improved approximation guarantees for some NP-hard special cases.

  2. Performance evaluation of different types of particle representation procedures of Particle Swarm Optimization in Job-shop Scheduling Problems

    NASA Astrophysics Data System (ADS)

    Izah Anuar, Nurul; Saptari, Adi

    2016-02-01

    This paper addresses the types of particle representation (encoding) procedures in a population-based stochastic optimization technique in solving scheduling problems known in the job-shop manufacturing environment. It intends to evaluate and compare the performance of different particle representation procedures in Particle Swarm Optimization (PSO) in the case of solving Job-shop Scheduling Problems (JSP). Particle representation procedures refer to the mapping between the particle position in PSO and the scheduling solution in JSP. It is an important step to be carried out so that each particle in PSO can represent a schedule in JSP. Three procedures such as Operation and Particle Position Sequence (OPPS), random keys representation and random-key encoding scheme are used in this study. These procedures have been tested on FT06 and FT10 benchmark problems available in the OR-Library, where the objective function is to minimize the makespan by the use of MATLAB software. Based on the experimental results, it is discovered that OPPS gives the best performance in solving both benchmark problems. The contribution of this paper is the fact that it demonstrates to the practitioners involved in complex scheduling problems that different particle representation procedures can have significant effects on the performance of PSO in solving JSP.

  3. Manipulating Tabu List to Handle Machine Breakdowns in Job Shop Scheduling Problems

    NASA Astrophysics Data System (ADS)

    Nababan, Erna Budhiarti; SalimSitompul, Opim

    2011-06-01

    Machine breakdowns in a production schedule may occur on a random basis that make the well-known hard combinatorial problem of Job Shop Scheduling Problems (JSSP) becomes more complex. One of popular techniques used to solve the combinatorial problems is Tabu Search. In this technique, moves that will be not allowed to be revisited are retained in a tabu list in order to avoid in gaining solutions that have been obtained previously. In this paper, we propose an algorithm to employ a second tabu list to keep broken machines, in addition to the tabu list that keeps the moves. The period of how long the broken machines will be kept on the list is categorized using fuzzy membership function. Our technique are tested to the benchmark data of JSSP available on the OR library. From the experiment, we found that our algorithm is promising to help a decision maker to face the event of machine breakdowns.

  4. Job Shop Scheduling Focusing on Role of Buffer

    NASA Astrophysics Data System (ADS)

    Hino, Rei; Kusumi, Tetsuya; Yoo, Jae-Kyu; Shimizu, Yoshiaki

    A scheduling problem is formulated in order to consistently manage each manufacturing resource, including machine tools, assembly robots, AGV, storehouses, material shelves, and so on. The manufacturing resources are classified into three types: producer, location, and mover. This paper focuses especially on the role of the buffer, and the differences among these types are analyzed. A unified scheduling formulation is derived from the analytical results based on the resource’s roles. Scheduling procedures based on dispatching rules are also proposed in order to numerically evaluate job shop-type production having finite buffer capacity. The influences of the capacity of bottle-necked production devices and the buffer on productivity are discussed.

  5. Multi-objective flexible job shop scheduling problem using variable neighborhood evolutionary algorithm

    NASA Astrophysics Data System (ADS)

    Wang, Chun; Ji, Zhicheng; Wang, Yan

    2017-07-01

    In this paper, multi-objective flexible job shop scheduling problem (MOFJSP) was studied with the objects to minimize makespan, total workload and critical workload. A variable neighborhood evolutionary algorithm (VNEA) was proposed to obtain a set of Pareto optimal solutions. First, two novel crowded operators in terms of the decision space and object space were proposed, and they were respectively used in mating selection and environmental selection. Then, two well-designed neighborhood structures were used in local search, which consider the problem characteristics and can hold fast convergence. Finally, extensive comparison was carried out with the state-of-the-art methods specially presented for solving MOFJSP on well-known benchmark instances. The results show that the proposed VNEA is more effective than other algorithms in solving MOFJSP.

  6. Generation of Look-Up Tables for Dynamic Job Shop Scheduling Decision Support Tool

    NASA Astrophysics Data System (ADS)

    Oktaviandri, Muchamad; Hassan, Adnan; Mohd Shaharoun, Awaluddin

    2016-02-01

    Majority of existing scheduling techniques are based on static demand and deterministic processing time, while most job shop scheduling problem are concerned with dynamic demand and stochastic processing time. As a consequence, the solutions obtained from the traditional scheduling technique are ineffective wherever changes occur to the system. Therefore, this research intends to develop a decision support tool (DST) based on promising artificial intelligent that is able to accommodate the dynamics that regularly occur in job shop scheduling problem. The DST was designed through three phases, i.e. (i) the look-up table generation, (ii) inverse model development and (iii) integration of DST components. This paper reports the generation of look-up tables for various scenarios as a part in development of the DST. A discrete event simulation model was used to compare the performance among SPT, EDD, FCFS, S/OPN and Slack rules; the best performances measures (mean flow time, mean tardiness and mean lateness) and the job order requirement (inter-arrival time, due dates tightness and setup time ratio) which were compiled into look-up tables. The well-known 6/6/J/Cmax Problem from Muth and Thompson (1963) was used as a case study. In the future, the performance measure of various scheduling scenarios and the job order requirement will be mapped using ANN inverse model.

  7. Performance of Extended Local Clustering Organization (LCO) for Large Scale Job-Shop Scheduling Problem (JSP)

    NASA Astrophysics Data System (ADS)

    Konno, Yohko; Suzuki, Keiji

    This paper describes an approach to development of a solution algorithm of a general-purpose for large scale problems using “Local Clustering Organization (LCO)” as a new solution for Job-shop scheduling problem (JSP). Using a performance effective large scale scheduling in the study of usual LCO, a solving JSP keep stability induced better solution is examined. In this study for an improvement of a performance of a solution for JSP, processes to a optimization by LCO is examined, and a scheduling solution-structure is extended to a new solution-structure based on machine-division. A solving method introduced into effective local clustering for the solution-structure is proposed as an extended LCO. An extended LCO has an algorithm which improves scheduling evaluation efficiently by clustering of parallel search which extends over plural machines. A result verified by an application of extended LCO on various scale of problems proved to conduce to minimizing make-span and improving on the stable performance.

  8. Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling.

    PubMed

    Yang, S; Wang, D

    2000-01-01

    This paper presents a constraint satisfaction adaptive neural network, together with several heuristics, to solve the generalized job-shop scheduling problem, one of NP-complete constraint satisfaction problems. The proposed neural network can be easily constructed and can adaptively adjust its weights of connections and biases of units based on the sequence and resource constraints of the job-shop scheduling problem during its processing. Several heuristics that can be combined with the neural network are also presented. In the combined approaches, the neural network is used to obtain feasible solutions, the heuristic algorithms are used to improve the performance of the neural network and the quality of the obtained solutions. Simulations have shown that the proposed neural network and its combined approaches are efficient with respect to the quality of solutions and the solving speed.

  9. Permutation flow-shop scheduling problem to optimize a quadratic objective function

    NASA Astrophysics Data System (ADS)

    Ren, Tao; Zhao, Peng; Zhang, Da; Liu, Bingqian; Yuan, Huawei; Bai, Danyu

    2017-09-01

    A flow-shop scheduling model enables appropriate sequencing for each job and for processing on a set of machines in compliance with identical processing orders. The objective is to achieve a feasible schedule for optimizing a given criterion. Permutation is a special setting of the model in which the processing order of the jobs on the machines is identical for each subsequent step of processing. This article addresses the permutation flow-shop scheduling problem to minimize the criterion of total weighted quadratic completion time. With a probability hypothesis, the asymptotic optimality of the weighted shortest processing time schedule under a consistency condition (WSPT-CC) is proven for sufficiently large-scale problems. However, the worst case performance ratio of the WSPT-CC schedule is the square of the number of machines in certain situations. A discrete differential evolution algorithm, where a new crossover method with multiple-point insertion is used to improve the final outcome, is presented to obtain high-quality solutions for moderate-scale problems. A sequence-independent lower bound is designed for pruning in a branch-and-bound algorithm for small-scale problems. A set of random experiments demonstrates the performance of the lower bound and the effectiveness of the proposed algorithms.

  10. A Solution Method of Job-shop Scheduling Problems by the Idle Time Shortening Type Genetic Algorithm

    NASA Astrophysics Data System (ADS)

    Ida, Kenichi; Osawa, Akira

    In this paper, we propose a new idle time shortening method for Job-shop scheduling problems (JSPs). We insert its method into a genetic algorithm (GA). The purpose of JSP is to find a schedule with the minimum makespan. We suppose that it is effective to reduce idle time of a machine in order to improve the makespan. The left shift is a famous algorithm in existing algorithms for shortening idle time. The left shift can not arrange the work to idle time. For that reason, some idle times are not shortened by the left shift. We propose two kinds of algorithms which shorten such idle time. Next, we combine these algorithms and the reversal of a schedule. We apply GA with its algorithm to benchmark problems and we show its effectiveness.

  11. A controlled genetic algorithm by fuzzy logic and belief functions for job-shop scheduling.

    PubMed

    Hajri, S; Liouane, N; Hammadi, S; Borne, P

    2000-01-01

    Most scheduling problems are highly complex combinatorial problems. However, stochastic methods such as genetic algorithm yield good solutions. In this paper, we present a controlled genetic algorithm (CGA) based on fuzzy logic and belief functions to solve job-shop scheduling problems. For better performance, we propose an efficient representational scheme, heuristic rules for creating the initial population, and a new methodology for mixing and computing genetic operator probabilities.

  12. Iterated greedy algorithms to minimize the total family flow time for job-shop scheduling with job families and sequence-dependent set-ups

    NASA Astrophysics Data System (ADS)

    Kim, Ji-Su; Park, Jung-Hyeon; Lee, Dong-Ho

    2017-10-01

    This study addresses a variant of job-shop scheduling in which jobs are grouped into job families, but they are processed individually. The problem can be found in various industrial systems, especially in reprocessing shops of remanufacturing systems. If the reprocessing shop is a job-shop type and has the component-matching requirements, it can be regarded as a job shop with job families since the components of a product constitute a job family. In particular, sequence-dependent set-ups in which set-up time depends on the job just completed and the next job to be processed are also considered. The objective is to minimize the total family flow time, i.e. the maximum among the completion times of the jobs within a job family. A mixed-integer programming model is developed and two iterated greedy algorithms with different local search methods are proposed. Computational experiments were conducted on modified benchmark instances and the results are reported.

  13. Solving the flexible job shop problem by hybrid metaheuristics-based multiagent model

    NASA Astrophysics Data System (ADS)

    Nouri, Houssem Eddine; Belkahla Driss, Olfa; Ghédira, Khaled

    2018-03-01

    The flexible job shop scheduling problem (FJSP) is a generalization of the classical job shop scheduling problem that allows to process operations on one machine out of a set of alternative machines. The FJSP is an NP-hard problem consisting of two sub-problems, which are the assignment and the scheduling problems. In this paper, we propose how to solve the FJSP by hybrid metaheuristics-based clustered holonic multiagent model. First, a neighborhood-based genetic algorithm (NGA) is applied by a scheduler agent for a global exploration of the search space. Second, a local search technique is used by a set of cluster agents to guide the research in promising regions of the search space and to improve the quality of the NGA final population. The efficiency of our approach is explained by the flexible selection of the promising parts of the search space by the clustering operator after the genetic algorithm process, and by applying the intensification technique of the tabu search allowing to restart the search from a set of elite solutions to attain new dominant scheduling solutions. Computational results are presented using four sets of well-known benchmark literature instances. New upper bounds are found, showing the effectiveness of the presented approach.

  14. Three hybridization models based on local search scheme for job shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Balbi Fraga, Tatiana

    2015-05-01

    This work presents three different hybridization models based on the general schema of Local Search Heuristics, named Hybrid Successive Application, Hybrid Neighborhood, and Hybrid Improved Neighborhood. Despite similar approaches might have already been presented in the literature in other contexts, in this work these models are applied to analyzes the solution of the job shop scheduling problem, with the heuristics Taboo Search and Particle Swarm Optimization. Besides, we investigate some aspects that must be considered in order to achieve better solutions than those obtained by the original heuristics. The results demonstrate that the algorithms derived from these three hybrid models are more robust than the original algorithms and able to get better results than those found by the single Taboo Search.

  15. Processing time tolerance-based ACO algorithm for solving job-shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Luo, Yabo; Waden, Yongo P.

    2017-06-01

    Ordinarily, Job Shop Scheduling Problem (JSSP) is known as NP-hard problem which has uncertainty and complexity that cannot be handled by a linear method. Thus, currently studies on JSSP are concentrated mainly on applying different methods of improving the heuristics for optimizing the JSSP. However, there still exist many problems for efficient optimization in the JSSP, namely, low efficiency and poor reliability, which can easily trap the optimization process of JSSP into local optima. Therefore, to solve this problem, a study on Ant Colony Optimization (ACO) algorithm combined with constraint handling tactics is carried out in this paper. Further, the problem is subdivided into three parts: (1) Analysis of processing time tolerance-based constraint features in the JSSP which is performed by the constraint satisfying model; (2) Satisfying the constraints by considering the consistency technology and the constraint spreading algorithm in order to improve the performance of ACO algorithm. Hence, the JSSP model based on the improved ACO algorithm is constructed; (3) The effectiveness of the proposed method based on reliability and efficiency is shown through comparative experiments which are performed on benchmark problems. Consequently, the results obtained by the proposed method are better, and the applied technique can be used in optimizing JSSP.

  16. Scheduling algorithm for flow shop with two batch-processing machines and arbitrary job sizes

    NASA Astrophysics Data System (ADS)

    Cheng, Bayi; Yang, Shanlin; Hu, Xiaoxuan; Li, Kai

    2014-03-01

    This article considers the problem of scheduling two batch-processing machines in flow shop where the jobs have arbitrary sizes and the machines have limited capacity. The jobs are processed in batches and the total size of jobs in each batch cannot exceed the machine capacity. Once a batch is being processed, no interruption is allowed until all the jobs in it are completed. The problem of minimising makespan is NP-hard in the strong sense. First, we present a mathematical model of the problem using integer programme. We show the scale of feasible solutions of the problem and provide optimality properties. Then, we propose a polynomial time algorithm with running time in O(nlogn). The jobs are first assigned in feasible batches and then scheduled on machines. For the general case, we prove that the proposed algorithm has a performance guarantee of 4. For the special case where the processing times of each job on the two machines satisfy p 1 j = ap 2 j , the performance guarantee is ? for a > 0.

  17. Open shop scheduling problem to minimize total weighted completion time

    NASA Astrophysics Data System (ADS)

    Bai, Danyu; Zhang, Zhihai; Zhang, Qiang; Tang, Mengqian

    2017-01-01

    A given number of jobs in an open shop scheduling environment must each be processed for given amounts of time on each of a given set of machines in an arbitrary sequence. This study aims to achieve a schedule that minimizes total weighted completion time. Owing to the strong NP-hardness of the problem, the weighted shortest processing time block (WSPTB) heuristic is presented to obtain approximate solutions for large-scale problems. Performance analysis proves the asymptotic optimality of the WSPTB heuristic in the sense of probability limits. The largest weight block rule is provided to seek optimal schedules in polynomial time for a special case. A hybrid discrete differential evolution algorithm is designed to obtain high-quality solutions for moderate-scale problems. Simulation experiments demonstrate the effectiveness of the proposed algorithms.

  18. Deconstructing Nowicki and Smutnickis i-TSAB tabu search algorithm for the job-shop scheduling problem.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitley, L. Darrell; Watson, Jean-Paul; Howe, Adele E.

    Over the last decade and a half, tabu search algorithms for machine scheduling have gained a near-mythical reputation by consistently equaling or establishing state-of-the-art performance levels on a range of academic and real-world problems. Yet, despite these successes, remarkably little research has been devoted to developing an understanding of why tabu search is so effective on this problem class. In this paper, we report results that provide significant progress in this direction. We consider Nowicki and Smutnicki's i-TSAB tabu search algorithm, which represents the current state-of-the-art for the makespan-minimization form of the classical jobshop scheduling problem. Via a series ofmore » controlled experiments, we identify those components of i-TSAB that enable it to achieve state-of-the-art performance levels. In doing so, we expose a number of misconceptions regarding the behavior and/or benefits of tabu search and other local search metaheuristics for the job-shop problem. Our results also serve to focus future research, by identifying those specific directions that are most likely to yield further improvements in performance.« less

  19. Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times.

    PubMed

    Yang, Xin; Zeng, Zhenxiang; Wang, Ruidong; Sun, Xueshan

    2016-01-01

    This paper presents a novel method on the optimization of bi-objective Flexible Job-shop Scheduling Problem (FJSP) under stochastic processing times. The robust counterpart model and the Non-dominated Sorting Genetic Algorithm II (NSGA-II) are used to solve the bi-objective FJSP with consideration of the completion time and the total energy consumption under stochastic processing times. The case study on GM Corporation verifies that the NSGA-II used in this paper is effective and has advantages to solve the proposed model comparing with HPSO and PSO+SA. The idea and method of the paper can be generalized widely in the manufacturing industry, because it can reduce the energy consumption of the energy-intensive manufacturing enterprise with less investment when the new approach is applied in existing systems.

  20. Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times

    PubMed Central

    Zeng, Zhenxiang; Wang, Ruidong; Sun, Xueshan

    2016-01-01

    This paper presents a novel method on the optimization of bi-objective Flexible Job-shop Scheduling Problem (FJSP) under stochastic processing times. The robust counterpart model and the Non-dominated Sorting Genetic Algorithm II (NSGA-II) are used to solve the bi-objective FJSP with consideration of the completion time and the total energy consumption under stochastic processing times. The case study on GM Corporation verifies that the NSGA-II used in this paper is effective and has advantages to solve the proposed model comparing with HPSO and PSO+SA. The idea and method of the paper can be generalized widely in the manufacturing industry, because it can reduce the energy consumption of the energy-intensive manufacturing enterprise with less investment when the new approach is applied in existing systems. PMID:27907163

  1. Discrete particle swarm optimization to solve multi-objective limited-wait hybrid flow shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Santosa, B.; Siswanto, N.; Fiqihesa

    2018-04-01

    This paper proposes a discrete Particle Swam Optimization (PSO) to solve limited-wait hybrid flowshop scheduing problem with multi objectives. Flow shop schedulimg represents the condition when several machines are arranged in series and each job must be processed at each machine with same sequence. The objective functions are minimizing completion time (makespan), total tardiness time, and total machine idle time. Flow shop scheduling model always grows to cope with the real production system accurately. Since flow shop scheduling is a NP-Hard problem then the most suitable method to solve is metaheuristics. One of metaheuristics algorithm is Particle Swarm Optimization (PSO), an algorithm which is based on the behavior of a swarm. Originally, PSO was intended to solve continuous optimization problems. Since flow shop scheduling is a discrete optimization problem, then, we need to modify PSO to fit the problem. The modification is done by using probability transition matrix mechanism. While to handle multi objectives problem, we use Pareto Optimal (MPSO). The results of MPSO is better than the PSO because the MPSO solution set produced higher probability to find the optimal solution. Besides the MPSO solution set is closer to the optimal solution

  2. Multi-objective flexible job-shop scheduling problem using modified discrete particle swarm optimization.

    PubMed

    Huang, Song; Tian, Na; Wang, Yan; Ji, Zhicheng

    2016-01-01

    Taking resource allocation into account, flexible job shop problem (FJSP) is a class of complex scheduling problem in manufacturing system. In order to utilize the machine resources rationally, multi-objective particle swarm optimization (MOPSO) integrating with variable neighborhood search is introduced to address FJSP efficiently. Firstly, the assignment rules (AL) and dispatching rules (DR) are provided to initialize the population. And then special discrete operators are designed to produce new individuals and earliest completion machine (ECM) is adopted in the disturbance operator to escape the optima. Secondly, personal-best archives (cognitive memories) and global-best archive (social memory), which are updated by the predefined non-dominated archive update strategy, are simultaneously designed to preserve non-dominated individuals and select personal-best positions and the global-best position. Finally, three neighborhoods are provided to search the neighborhoods of global-best archive for enhancing local search ability. The proposed algorithm is evaluated by using Kacem instances and Brdata instances, and a comparison with other approaches shows the effectiveness of the proposed algorithm for FJSP.

  3. A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Mirabi, Mohammad; Fatemi Ghomi, S. M. T.; Jolai, F.

    2014-04-01

    Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this paper develops a novel hybrid genetic algorithm (HGA) with three genetic operators. Proposed HGA applies a modified approach to generate a pool of initial solutions, and also uses an improved heuristic called the iterated swap procedure to improve the initial solutions. We consider the make-to-order production approach that some sequences between jobs are assumed as tabu based on maximum allowable setup cost. In addition, the results are compared to some recently developed heuristics and computational experimental results show that the proposed HGA performs very competitively with respect to accuracy and efficiency of solution.

  4. Improved teaching-learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Buddala, Raviteja; Mahapatra, Siba Sankar

    2017-11-01

    Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having `g' operations is performed on `g' operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem becomes a flexible flow shop problem (FFSP). FFSP which contains all the complexities involved in a simple flow shop and parallel machine scheduling problems is a well-known NP-hard (Non-deterministic polynomial time) problem. Owing to high computational complexity involved in solving these problems, it is not always possible to obtain an optimal solution in a reasonable computation time. To obtain near-optimal solutions in a reasonable computation time, a large variety of meta-heuristics have been proposed in the past. However, tuning algorithm-specific parameters for solving FFSP is rather tricky and time consuming. To address this limitation, teaching-learning-based optimization (TLBO) and JAYA algorithm are chosen for the study because these are not only recent meta-heuristics but they do not require tuning of algorithm-specific parameters. Although these algorithms seem to be elegant, they lose solution diversity after few iterations and get trapped at the local optima. To alleviate such drawback, a new local search procedure is proposed in this paper to improve the solution quality. Further, mutation strategy (inspired from genetic algorithm) is incorporated in the basic algorithm to maintain solution diversity in the population. Computational experiments have been conducted on standard benchmark problems to calculate makespan and computational time. It is found that the rate of convergence of TLBO is superior to JAYA. From the results, it is found that TLBO and JAYA outperform many algorithms reported in the literature and can be treated as efficient methods for solving the FFSP.

  5. A Bee Evolutionary Guiding Nondominated Sorting Genetic Algorithm II for Multiobjective Flexible Job-Shop Scheduling.

    PubMed

    Deng, Qianwang; Gong, Guiliang; Gong, Xuran; Zhang, Like; Liu, Wei; Ren, Qinghua

    2017-01-01

    Flexible job-shop scheduling problem (FJSP) is an NP-hard puzzle which inherits the job-shop scheduling problem (JSP) characteristics. This paper presents a bee evolutionary guiding nondominated sorting genetic algorithm II (BEG-NSGA-II) for multiobjective FJSP (MO-FJSP) with the objectives to minimize the maximal completion time, the workload of the most loaded machine, and the total workload of all machines. It adopts a two-stage optimization mechanism during the optimizing process. In the first stage, the NSGA-II algorithm with T iteration times is first used to obtain the initial population N , in which a bee evolutionary guiding scheme is presented to exploit the solution space extensively. In the second stage, the NSGA-II algorithm with GEN iteration times is used again to obtain the Pareto-optimal solutions. In order to enhance the searching ability and avoid the premature convergence, an updating mechanism is employed in this stage. More specifically, its population consists of three parts, and each of them changes with the iteration times. What is more, numerical simulations are carried out which are based on some published benchmark instances. Finally, the effectiveness of the proposed BEG-NSGA-II algorithm is shown by comparing the experimental results and the results of some well-known algorithms already existed.

  6. A Bee Evolutionary Guiding Nondominated Sorting Genetic Algorithm II for Multiobjective Flexible Job-Shop Scheduling

    PubMed Central

    Deng, Qianwang; Gong, Xuran; Zhang, Like; Liu, Wei; Ren, Qinghua

    2017-01-01

    Flexible job-shop scheduling problem (FJSP) is an NP-hard puzzle which inherits the job-shop scheduling problem (JSP) characteristics. This paper presents a bee evolutionary guiding nondominated sorting genetic algorithm II (BEG-NSGA-II) for multiobjective FJSP (MO-FJSP) with the objectives to minimize the maximal completion time, the workload of the most loaded machine, and the total workload of all machines. It adopts a two-stage optimization mechanism during the optimizing process. In the first stage, the NSGA-II algorithm with T iteration times is first used to obtain the initial population N, in which a bee evolutionary guiding scheme is presented to exploit the solution space extensively. In the second stage, the NSGA-II algorithm with GEN iteration times is used again to obtain the Pareto-optimal solutions. In order to enhance the searching ability and avoid the premature convergence, an updating mechanism is employed in this stage. More specifically, its population consists of three parts, and each of them changes with the iteration times. What is more, numerical simulations are carried out which are based on some published benchmark instances. Finally, the effectiveness of the proposed BEG-NSGA-II algorithm is shown by comparing the experimental results and the results of some well-known algorithms already existed. PMID:28458687

  7. An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

    NASA Technical Reports Server (NTRS)

    Moore, J. E.

    1975-01-01

    An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

  8. Job shop scheduling model for non-identic machine with fixed delivery time to minimize tardiness

    NASA Astrophysics Data System (ADS)

    Kusuma, K. K.; Maruf, A.

    2016-02-01

    Scheduling non-identic machines problem with low utilization characteristic and fixed delivery time are frequent in manufacture industry. This paper propose a mathematical model to minimize total tardiness for non-identic machines in job shop environment. This model will be categorized as an integer linier programming model and using branch and bound algorithm as the solver method. We will use fixed delivery time as main constraint and different processing time to process a job. The result of this proposed model shows that the utilization of production machines can be increase with minimal tardiness using fixed delivery time as constraint.

  9. Discrete Bat Algorithm for Optimal Problem of Permutation Flow Shop Scheduling

    PubMed Central

    Luo, Qifang; Zhou, Yongquan; Xie, Jian; Ma, Mingzhi; Li, Liangliang

    2014-01-01

    A discrete bat algorithm (DBA) is proposed for optimal permutation flow shop scheduling problem (PFSP). Firstly, the discrete bat algorithm is constructed based on the idea of basic bat algorithm, which divide whole scheduling problem into many subscheduling problems and then NEH heuristic be introduced to solve subscheduling problem. Secondly, some subsequences are operated with certain probability in the pulse emission and loudness phases. An intensive virtual population neighborhood search is integrated into the discrete bat algorithm to further improve the performance. Finally, the experimental results show the suitability and efficiency of the present discrete bat algorithm for optimal permutation flow shop scheduling problem. PMID:25243220

  10. Discrete bat algorithm for optimal problem of permutation flow shop scheduling.

    PubMed

    Luo, Qifang; Zhou, Yongquan; Xie, Jian; Ma, Mingzhi; Li, Liangliang

    2014-01-01

    A discrete bat algorithm (DBA) is proposed for optimal permutation flow shop scheduling problem (PFSP). Firstly, the discrete bat algorithm is constructed based on the idea of basic bat algorithm, which divide whole scheduling problem into many subscheduling problems and then NEH heuristic be introduced to solve subscheduling problem. Secondly, some subsequences are operated with certain probability in the pulse emission and loudness phases. An intensive virtual population neighborhood search is integrated into the discrete bat algorithm to further improve the performance. Finally, the experimental results show the suitability and efficiency of the present discrete bat algorithm for optimal permutation flow shop scheduling problem.

  11. Two-machine flow shop scheduling integrated with preventive maintenance planning

    NASA Astrophysics Data System (ADS)

    Wang, Shijin; Liu, Ming

    2016-02-01

    This paper investigates an integrated optimisation problem of production scheduling and preventive maintenance (PM) in a two-machine flow shop with time to failure of each machine subject to a Weibull probability distribution. The objective is to find the optimal job sequence and the optimal PM decisions before each job such that the expected makespan is minimised. To investigate the value of integrated scheduling solution, computational experiments on small-scale problems with different configurations are conducted with total enumeration method, and the results are compared with those of scheduling without maintenance but with machine degradation, and individual job scheduling combined with independent PM planning. Then, for large-scale problems, four genetic algorithm (GA) based heuristics are proposed. The numerical results with several large problem sizes and different configurations indicate the potential benefits of integrated scheduling solution and the results also show that proposed GA-based heuristics are efficient for the integrated problem.

  12. A Hyper-Heuristic Ensemble Method for Static Job-Shop Scheduling.

    PubMed

    Hart, Emma; Sim, Kevin

    2016-01-01

    We describe a new hyper-heuristic method NELLI-GP for solving job-shop scheduling problems (JSSP) that evolves an ensemble of heuristics. The ensemble adopts a divide-and-conquer approach in which each heuristic solves a unique subset of the instance set considered. NELLI-GP extends an existing ensemble method called NELLI by introducing a novel heuristic generator that evolves heuristics composed of linear sequences of dispatching rules: each rule is represented using a tree structure and is itself evolved. Following a training period, the ensemble is shown to outperform both existing dispatching rules and a standard genetic programming algorithm on a large set of new test instances. In addition, it obtains superior results on a set of 210 benchmark problems from the literature when compared to two state-of-the-art hyper-heuristic approaches. Further analysis of the relationship between heuristics in the evolved ensemble and the instances each solves provides new insights into features that might describe similar instances.

  13. Evaluation and Selection of Best Priority Sequencing Rule in Job Shop Scheduling using Hybrid MCDM Technique

    NASA Astrophysics Data System (ADS)

    Kiran Kumar, Kalla; Nagaraju, Dega; Gayathri, S.; Narayanan, S.

    2017-05-01

    Priority Sequencing Rules provide the guidance for the order in which the jobs are to be processed at a workstation. The application of different priority rules in job shop scheduling gives different order of scheduling. More experimentation needs to be conducted before a final choice is made to know the best priority sequencing rule. Hence, a comprehensive method of selecting the right choice is essential in managerial decision making perspective. This paper considers seven different priority sequencing rules in job shop scheduling. For evaluation and selection of the best priority sequencing rule, a set of eight criteria are considered. The aim of this work is to demonstrate the methodology of evaluating and selecting the best priority sequencing rule by using hybrid multi criteria decision making technique (MCDM), i.e., analytical hierarchy process (AHP) with technique for order preference by similarity to ideal solution (TOPSIS). The criteria weights are calculated by using AHP whereas the relative closeness values of all priority sequencing rules are computed based on TOPSIS with the help of data acquired from the shop floor of a manufacturing firm. Finally, from the findings of this work, the priority sequencing rules are ranked from most important to least important. The comprehensive methodology presented in this paper is very much essential for the management of a workstation to choose the best priority sequencing rule among the available alternatives for processing the jobs with maximum benefit.

  14. Efficient bounding schemes for the two-center hybrid flow shop scheduling problem with removal times.

    PubMed

    Hidri, Lotfi; Gharbi, Anis; Louly, Mohamed Aly

    2014-01-01

    We focus on the two-center hybrid flow shop scheduling problem with identical parallel machines and removal times. The job removal time is the required duration to remove it from a machine after its processing. The objective is to minimize the maximum completion time (makespan). A heuristic and a lower bound are proposed for this NP-Hard problem. These procedures are based on the optimal solution of the parallel machine scheduling problem with release dates and delivery times. The heuristic is composed of two phases. The first one is a constructive phase in which an initial feasible solution is provided, while the second phase is an improvement one. Intensive computational experiments have been conducted to confirm the good performance of the proposed procedures.

  15. Efficient Bounding Schemes for the Two-Center Hybrid Flow Shop Scheduling Problem with Removal Times

    PubMed Central

    2014-01-01

    We focus on the two-center hybrid flow shop scheduling problem with identical parallel machines and removal times. The job removal time is the required duration to remove it from a machine after its processing. The objective is to minimize the maximum completion time (makespan). A heuristic and a lower bound are proposed for this NP-Hard problem. These procedures are based on the optimal solution of the parallel machine scheduling problem with release dates and delivery times. The heuristic is composed of two phases. The first one is a constructive phase in which an initial feasible solution is provided, while the second phase is an improvement one. Intensive computational experiments have been conducted to confirm the good performance of the proposed procedures. PMID:25610911

  16. Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times

    NASA Astrophysics Data System (ADS)

    Sharma, Pankaj; Jain, Ajai

    2014-12-01

    Stochastic dynamic job shop scheduling problem with consideration of sequence-dependent setup times are among the most difficult classes of scheduling problems. This paper assesses the performance of nine dispatching rules in such shop from makespan, mean flow time, maximum flow time, mean tardiness, maximum tardiness, number of tardy jobs, total setups and mean setup time performance measures viewpoint. A discrete event simulation model of a stochastic dynamic job shop manufacturing system is developed for investigation purpose. Nine dispatching rules identified from literature are incorporated in the simulation model. The simulation experiments are conducted under due date tightness factor of 3, shop utilization percentage of 90% and setup times less than processing times. Results indicate that shortest setup time (SIMSET) rule provides the best performance for mean flow time and number of tardy jobs measures. The job with similar setup and modified earliest due date (JMEDD) rule provides the best performance for makespan, maximum flow time, mean tardiness, maximum tardiness, total setups and mean setup time measures.

  17. Flexible Job-Shop Scheduling with Dual-Resource Constraints to Minimize Tardiness Using Genetic Algorithm

    NASA Astrophysics Data System (ADS)

    Paksi, A. B. N.; Ma'ruf, A.

    2016-02-01

    In general, both machines and human resources are needed for processing a job on production floor. However, most classical scheduling problems have ignored the possible constraint caused by availability of workers and have considered only machines as a limited resource. In addition, along with production technology development, routing flexibility appears as a consequence of high product variety and medium demand for each product. Routing flexibility is caused by capability of machines that offers more than one machining process. This paper presents a method to address scheduling problem constrained by both machines and workers, considering routing flexibility. Scheduling in a Dual-Resource Constrained shop is categorized as NP-hard problem that needs long computational time. Meta-heuristic approach, based on Genetic Algorithm, is used due to its practical implementation in industry. Developed Genetic Algorithm uses indirect chromosome representative and procedure to transform chromosome into Gantt chart. Genetic operators, namely selection, elitism, crossover, and mutation are developed to search the best fitness value until steady state condition is achieved. A case study in a manufacturing SME is used to minimize tardiness as objective function. The algorithm has shown 25.6% reduction of tardiness, equal to 43.5 hours.

  18. Automatic programming via iterated local search for dynamic job shop scheduling.

    PubMed

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2015-01-01

    Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism.

  19. An effective hybrid immune algorithm for solving the distributed permutation flow-shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Xu, Ye; Wang, Ling; Wang, Shengyao; Liu, Min

    2014-09-01

    In this article, an effective hybrid immune algorithm (HIA) is presented to solve the distributed permutation flow-shop scheduling problem (DPFSP). First, a decoding method is proposed to transfer a job permutation sequence to a feasible schedule considering both factory dispatching and job sequencing. Secondly, a local search with four search operators is presented based on the characteristics of the problem. Thirdly, a special crossover operator is designed for the DPFSP, and mutation and vaccination operators are also applied within the framework of the HIA to perform an immune search. The influence of parameter setting on the HIA is investigated based on the Taguchi method of design of experiment. Extensive numerical testing results based on 420 small-sized instances and 720 large-sized instances are provided. The effectiveness of the HIA is demonstrated by comparison with some existing heuristic algorithms and the variable neighbourhood descent methods. New best known solutions are obtained by the HIA for 17 out of 420 small-sized instances and 585 out of 720 large-sized instances.

  20. A Comparison of the DISASTER (Trademark) Scheduling Software with a Simultaneous Scheduling Algorithm for Minimizing Maximum Tardiness in Job Shops

    DTIC Science & Technology

    1993-09-01

    goal ( Heizer , Render , and Stair, 1993:94). Integer Prgronmming. Integer programming is a general purpose approach used to optimally solve job shop...Scheduling," Operations Research Journal. 29, No 4: 646-667 (July-August 1981). Heizer , Jay, Barry Render and Ralph M. Stair, Jr. Production and Operations

  1. On the asymptotic optimality and improved strategies of SPTB heuristic for open-shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Bai, Danyu; Zhang, Zhihai

    2014-08-01

    This article investigates the open-shop scheduling problem with the optimal criterion of minimising the sum of quadratic completion times. For this NP-hard problem, the asymptotic optimality of the shortest processing time block (SPTB) heuristic is proven in the sense of limit. Moreover, three different improvements, namely, the job-insert scheme, tabu search and genetic algorithm, are introduced to enhance the quality of the original solution generated by the SPTB heuristic. At the end of the article, a series of numerical experiments demonstrate the convergence of the heuristic, the performance of the improvements and the effectiveness of the quadratic objective.

  2. Stochastic flow shop scheduling of overlapping jobs on tandem machines in application to optimizing the US Army's deliberate nuclear, biological, and chemical decontamination process, (final report). Master's thesis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Novikov, V.

    1991-05-01

    The U.S. Army's detailed equipment decontamination process is a stochastic flow shop which has N independent non-identical jobs (vehicles) which have overlapping processing times. This flow shop consists of up to six non-identical machines (stations). With the exception of one station, the processing times of the jobs are random variables. Based on an analysis of the processing times, the jobs for the 56 Army heavy division companies were scheduled according to the best shortest expected processing time - longest expected processing time (SEPT-LEPT) sequence. To assist in this scheduling the Gap Comparison Heuristic was developed to select the best SEPT-LEPTmore » schedule. This schedule was then used in balancing the detailed equipment decon line in order to find the best possible site configuration subject to several constraints. The detailed troop decon line, in which all jobs are independent and identically distributed, was then balanced. Lastly, an NBC decon optimization computer program was developed using the scheduling and line balancing results. This program serves as a prototype module for the ANBACIS automated NBC decision support system.... Decontamination, Stochastic flow shop, Scheduling, Stochastic scheduling, Minimization of the makespan, SEPT-LEPT Sequences, Flow shop line balancing, ANBACIS.« less

  3. Outsourcing and scheduling for a two-machine flow shop with release times

    NASA Astrophysics Data System (ADS)

    Ahmadizar, Fardin; Amiri, Zeinab

    2018-03-01

    This article addresses a two-machine flow shop scheduling problem where jobs are released intermittently and outsourcing is allowed. The first operations of outsourced jobs are processed by the first subcontractor, they are transported in batches to the second subcontractor for processing their second operations, and finally they are transported back to the manufacturer. The objective is to select a subset of jobs to be outsourced, to schedule both the in-house and the outsourced jobs, and to determine a transportation plan for the outsourced jobs so as to minimize the sum of the makespan and the outsourcing and transportation costs. Two mathematical models of the problem and several necessary optimality conditions are presented. A solution approach is then proposed by incorporating the dominance properties with an ant colony algorithm. Finally, computational experiments are conducted to evaluate the performance of the models and solution approach.

  4. Scheduling of flow shop problems on 3 machines in fuzzy environment with double transport facility

    NASA Astrophysics Data System (ADS)

    Sathish, Shakeela; Ganesan, K.

    2016-06-01

    Flow shop scheduling is a decision making problem in production and manufacturing field which has a significant impact on the performance of an organization. When the machines on which jobs are to be processed are placed at different places, the transportation time plays a significant role in production. Further two different transport agents where 1st takes the job from 1st machine to 2nd machine and then returns back to the first machine and the 2nd takes the job from 2nd machine to 3rd machine and then returns back to the 2nd machine are also considered. We propose a method to minimize the total make span; without converting the fuzzy processing time to classical numbers by using a new type of fuzzy arithmetic and a fuzzy ranking method. A numerical example is provided to explain the proposed method.

  5. Asymptotic analysis of online algorithms and improved scheme for the flow shop scheduling problem with release dates

    NASA Astrophysics Data System (ADS)

    Bai, Danyu

    2015-08-01

    This paper discusses the flow shop scheduling problem to minimise the total quadratic completion time (TQCT) with release dates in offline and online environments. For this NP-hard problem, the investigation is focused on the performance of two online algorithms based on the Shortest Processing Time among Available jobs rule. Theoretical results indicate the asymptotic optimality of the algorithms as the problem scale is sufficiently large. To further enhance the quality of the original solutions, the improvement scheme is provided for these algorithms. A new lower bound with performance guarantee is provided, and computational experiments show the effectiveness of these heuristics. Moreover, several results of the single-machine TQCT problem with release dates are also obtained for the deduction of the main theorem.

  6. Genetic programming for evolving due-date assignment models in job shop environments.

    PubMed

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2014-01-01

    Due-date assignment plays an important role in scheduling systems and strongly influences the delivery performance of job shops. Because of the stochastic and dynamic nature of job shops, the development of general due-date assignment models (DDAMs) is complicated. In this study, two genetic programming (GP) methods are proposed to evolve DDAMs for job shop environments. The experimental results show that the evolved DDAMs can make more accurate estimates than other existing dynamic DDAMs with promising reusability. In addition, the evolved operation-based DDAMs show better performance than the evolved DDAMs employing aggregate information of jobs and machines.

  7. A synergetic combination of small and large neighborhood schemes in developing an effective procedure for solving the job shop scheduling problem.

    PubMed

    Amirghasemi, Mehrdad; Zamani, Reza

    2014-01-01

    This paper presents an effective procedure for solving the job shop problem. Synergistically combining small and large neighborhood schemes, the procedure consists of four components, namely (i) a construction method for generating semi-active schedules by a forward-backward mechanism, (ii) a local search for manipulating a small neighborhood structure guided by a tabu list, (iii) a feedback-based mechanism for perturbing the solutions generated, and (iv) a very large-neighborhood local search guided by a forward-backward shifting bottleneck method. The combination of shifting bottleneck mechanism and tabu list is used as a means of the manipulation of neighborhood structures, and the perturbation mechanism employed diversifies the search. A feedback mechanism, called repeat-check, detects consequent repeats and ignites a perturbation when the total number of consecutive repeats for two identical makespan values reaches a given threshold. The results of extensive computational experiments on the benchmark instances indicate that the combination of these four components is synergetic, in the sense that they collectively make the procedure fast and robust.

  8. Proposed algorithm to improve job shop production scheduling using ant colony optimization method

    NASA Astrophysics Data System (ADS)

    Pakpahan, Eka KA; Kristina, Sonna; Setiawan, Ari

    2017-12-01

    This paper deals with the determination of job shop production schedule on an automatic environment. On this particular environment, machines and material handling system are integrated and controlled by a computer center where schedule were created and then used to dictate the movement of parts and the operations at each machine. This setting is usually designed to have an unmanned production process for a specified interval time. We consider here parts with various operations requirement. Each operation requires specific cutting tools. These parts are to be scheduled on machines each having identical capability, meaning that each machine is equipped with a similar set of cutting tools therefore is capable of processing any operation. The availability of a particular machine to process a particular operation is determined by the remaining life time of its cutting tools. We proposed an algorithm based on the ant colony optimization method and embedded them on matlab software to generate production schedule which minimize the total processing time of the parts (makespan). We test the algorithm on data provided by real industry and the process shows a very short computation time. This contributes a lot to the flexibility and timelines targeted on an automatic environment.

  9. An extended continuous estimation of distribution algorithm for solving the permutation flow-shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Shao, Zhongshi; Pi, Dechang; Shao, Weishi

    2017-11-01

    This article proposes an extended continuous estimation of distribution algorithm (ECEDA) to solve the permutation flow-shop scheduling problem (PFSP). In ECEDA, to make a continuous estimation of distribution algorithm (EDA) suitable for the PFSP, the largest order value rule is applied to convert continuous vectors to discrete job permutations. A probabilistic model based on a mixed Gaussian and Cauchy distribution is built to maintain the exploration ability of the EDA. Two effective local search methods, i.e. revolver-based variable neighbourhood search and Hénon chaotic-based local search, are designed and incorporated into the EDA to enhance the local exploitation. The parameters of the proposed ECEDA are calibrated by means of a design of experiments approach. Simulation results and comparisons based on some benchmark instances show the efficiency of the proposed algorithm for solving the PFSP.

  10. Genetic algorithm parameters tuning for resource-constrained project scheduling problem

    NASA Astrophysics Data System (ADS)

    Tian, Xingke; Yuan, Shengrui

    2018-04-01

    Project Scheduling Problem (RCPSP) is a kind of important scheduling problem. To achieve a certain optimal goal such as the shortest duration, the smallest cost, the resource balance and so on, it is required to arrange the start and finish of all tasks under the condition of satisfying project timing constraints and resource constraints. In theory, the problem belongs to the NP-hard problem, and the model is abundant. Many combinatorial optimization problems are special cases of RCPSP, such as job shop scheduling, flow shop scheduling and so on. At present, the genetic algorithm (GA) has been used to deal with the classical RCPSP problem and achieved remarkable results. Vast scholars have also studied the improved genetic algorithm for the RCPSP problem, which makes it to solve the RCPSP problem more efficiently and accurately. However, for the selection of the main parameters of the genetic algorithm, there is no parameter optimization in these studies. Generally, we used the empirical method, but it cannot ensure to meet the optimal parameters. In this paper, the problem was carried out, which is the blind selection of parameters in the process of solving the RCPSP problem. We made sampling analysis, the establishment of proxy model and ultimately solved the optimal parameters.

  11. Effective Iterated Greedy Algorithm for Flow-Shop Scheduling Problems with Time lags

    NASA Astrophysics Data System (ADS)

    ZHAO, Ning; YE, Song; LI, Kaidian; CHEN, Siyu

    2017-05-01

    Flow shop scheduling problem with time lags is a practical scheduling problem and attracts many studies. Permutation problem(PFSP with time lags) is concentrated but non-permutation problem(non-PFSP with time lags) seems to be neglected. With the aim to minimize the makespan and satisfy time lag constraints, efficient algorithms corresponding to PFSP and non-PFSP problems are proposed, which consist of iterated greedy algorithm for permutation(IGTLP) and iterated greedy algorithm for non-permutation (IGTLNP). The proposed algorithms are verified using well-known simple and complex instances of permutation and non-permutation problems with various time lag ranges. The permutation results indicate that the proposed IGTLP can reach near optimal solution within nearly 11% computational time of traditional GA approach. The non-permutation results indicate that the proposed IG can reach nearly same solution within less than 1% computational time compared with traditional GA approach. The proposed research combines PFSP and non-PFSP together with minimal and maximal time lag consideration, which provides an interesting viewpoint for industrial implementation.

  12. Forecasting of indirect consumables for a Job Shop

    NASA Astrophysics Data System (ADS)

    Shakeel, M.; Khan, S.; Khan, W. A.

    2016-08-01

    A job shop has an arrangement where similar machines (Direct consumables) are grouped together and use indirect consumables to produce a product. The indirect consumables include hack saw blades, emery paper, painting brush etc. The job shop is serving various orders at a particular time for the optimal operation of job shop. Forecasting is required to predict the demand of direct and indirect consumables in a job shop. Forecasting is also needed to manage lead time, optimize inventory cost and stock outs. The objective of this research is to obtain the forecast for indirect consumables. The paper shows how job shop can manage their indirect consumables more accurately by establishing a new technique of forecasting. This results in profitable use of job shop by multiple users.

  13. Production scheduling and rescheduling with genetic algorithms.

    PubMed

    Bierwirth, C; Mattfeld, D C

    1999-01-01

    A general model for job shop scheduling is described which applies to static, dynamic and non-deterministic production environments. Next, a Genetic Algorithm is presented which solves the job shop scheduling problem. This algorithm is tested in a dynamic environment under different workload situations. Thereby, a highly efficient decoding procedure is proposed which strongly improves the quality of schedules. Finally, this technique is tested for scheduling and rescheduling in a non-deterministic environment. It is shown by experiment that conventional methods of production control are clearly outperformed at reasonable run-time costs.

  14. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  15. Minimizing makespan in a two-stage flow shop with parallel batch-processing machines and re-entrant jobs

    NASA Astrophysics Data System (ADS)

    Huang, J. D.; Liu, J. J.; Chen, Q. X.; Mao, N.

    2017-06-01

    Against a background of heat-treatment operations in mould manufacturing, a two-stage flow-shop scheduling problem is described for minimizing makespan with parallel batch-processing machines and re-entrant jobs. The weights and release dates of jobs are non-identical, but job processing times are equal. A mixed-integer linear programming model is developed and tested with small-scale scenarios. Given that the problem is NP hard, three heuristic construction methods with polynomial complexity are proposed. The worst case of the new constructive heuristic is analysed in detail. A method for computing lower bounds is proposed to test heuristic performance. Heuristic efficiency is tested with sets of scenarios. Compared with the two improved heuristics, the performance of the new constructive heuristic is superior.

  16. A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling.

    PubMed

    Li, Bin-Bin; Wang, Ling

    2007-06-01

    This paper proposes a hybrid quantum-inspired genetic algorithm (HQGA) for the multiobjective flow shop scheduling problem (FSSP), which is a typical NP-hard combinatorial optimization problem with strong engineering backgrounds. On the one hand, a quantum-inspired GA (QGA) based on Q-bit representation is applied for exploration in the discrete 0-1 hyperspace by using the updating operator of quantum gate and genetic operators of Q-bit. Moreover, random-key representation is used to convert the Q-bit representation to job permutation for evaluating the objective values of the schedule solution. On the other hand, permutation-based GA (PGA) is applied for both performing exploration in permutation-based scheduling space and stressing exploitation for good schedule solutions. To evaluate solutions in multiobjective sense, a randomly weighted linear-sum function is used in QGA, and a nondominated sorting technique including classification of Pareto fronts and fitness assignment is applied in PGA with regard to both proximity and diversity of solutions. To maintain the diversity of the population, two trimming techniques for population are proposed. The proposed HQGA is tested based on some multiobjective FSSPs. Simulation results and comparisons based on several performance metrics demonstrate the effectiveness of the proposed HQGA.

  17. Scheduling periodic jobs using imprecise results

    NASA Technical Reports Server (NTRS)

    Chung, Jen-Yao; Liu, Jane W. S.; Lin, Kwei-Jay

    1987-01-01

    One approach to avoid timing faults in hard, real-time systems is to make available intermediate, imprecise results produced by real-time processes. When a result of the desired quality cannot be produced in time, an imprecise result of acceptable quality produced before the deadline can be used. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. Since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result, the amount of processor time assigned to any task in a valid schedule can be less than the amount of time required to complete the task. A meaningful formulation of the scheduling problem must take into account the overall quality of the results. Depending on the different types of undesirable effects caused by errors, jobs are classified as type N or type C. For type N jobs, the effects of errors in results produced in different periods are not cumulative. A reasonable performance measure is the average error over all jobs. Three heuristic algorithms that lead to feasible schedules with small average errors are described. For type C jobs, the undesirable effects of errors produced in different periods are cumulative. Schedulability criteria of type C jobs are discussed.

  18. Job Scheduling in a Heterogeneous Grid Environment

    NASA Technical Reports Server (NTRS)

    Shan, Hong-Zhang; Smith, Warren; Oliker, Leonid; Biswas, Rupak

    2004-01-01

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  19. Asymptotic analysis of SPTA-based algorithms for no-wait flow shop scheduling problem with release dates.

    PubMed

    Ren, Tao; Zhang, Chuan; Lin, Lin; Guo, Meiting; Xie, Xionghang

    2014-01-01

    We address the scheduling problem for a no-wait flow shop to optimize total completion time with release dates. With the tool of asymptotic analysis, we prove that the objective values of two SPTA-based algorithms converge to the optimal value for sufficiently large-sized problems. To further enhance the performance of the SPTA-based algorithms, an improvement scheme based on local search is provided for moderate scale problems. New lower bound is presented for evaluating the asymptotic optimality of the algorithms. Numerical simulations demonstrate the effectiveness of the proposed algorithms.

  20. Asymptotic Analysis of SPTA-Based Algorithms for No-Wait Flow Shop Scheduling Problem with Release Dates

    PubMed Central

    Ren, Tao; Zhang, Chuan; Lin, Lin; Guo, Meiting; Xie, Xionghang

    2014-01-01

    We address the scheduling problem for a no-wait flow shop to optimize total completion time with release dates. With the tool of asymptotic analysis, we prove that the objective values of two SPTA-based algorithms converge to the optimal value for sufficiently large-sized problems. To further enhance the performance of the SPTA-based algorithms, an improvement scheme based on local search is provided for moderate scale problems. New lower bound is presented for evaluating the asymptotic optimality of the algorithms. Numerical simulations demonstrate the effectiveness of the proposed algorithms. PMID:24764774

  1. A Solution Method of Scheduling Problem with Worker Allocation by a Genetic Algorithm

    NASA Astrophysics Data System (ADS)

    Osawa, Akira; Ida, Kenichi

    In a scheduling problem with worker allocation (SPWA) proposed by Iima et al, the worker's skill level to each machine is all the same. However, each worker has a different skill level for each machine in the real world. For that reason, we propose a new model of SPWA in which a worker has the different skill level to each machine. To solve the problem, we propose a new GA for SPWA consisting of the following new three procedures, shortening of idle time, modifying infeasible solution to feasible solution, and a new selection method for GA. The effectiveness of the proposed algorithm is clarified by numerical experiments using benchmark problems for job-shop scheduling.

  2. A modify ant colony optimization for the grid jobs scheduling problem with QoS requirements

    NASA Astrophysics Data System (ADS)

    Pu, Xun; Lu, XianLiang

    2011-10-01

    Job scheduling with customers' quality of service (QoS) requirement is challenging in grid environment. In this paper, we present a modify Ant colony optimization (MACO) for the Job scheduling problem in grid. Instead of using the conventional construction approach to construct feasible schedules, the proposed algorithm employs a decomposition method to satisfy the customer's deadline and cost requirements. Besides, a new mechanism of service instances state updating is embedded to improve the convergence of MACO. Experiments demonstrate the effectiveness of the proposed algorithm.

  3. Machine Shop Suggested Job and Task Sheets. Part I. 25 Elementary Jobs.

    ERIC Educational Resources Information Center

    Texas A and M Univ., College Station. Vocational Instructional Services.

    This volume consists of elementary job and task sheets adaptable for use in the regular vocational industrial education programs for the training of machinists and machine shop operators. Twenty-five simple machine shop job sheets are included. Some or all of this material is provided for each job sheet: an introductory sheet with aim, checking…

  4. Machine Shop Suggested Job and Task Sheets. Part II. 21 Advanced Jobs.

    ERIC Educational Resources Information Center

    Texas A and M Univ., College Station. Vocational Instructional Services.

    This volume consists of advanced job and task sheets adaptable for use in the regular vocational industrial education programs for the training of machinists and machine shop operators. Twenty-one advanced machine shop job sheets are included. Some or all of this material is provided for each job: an introductory sheet with aim, checking…

  5. An analysis of iterated local search for job-shop scheduling.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitley, L. Darrell; Howe, Adele E.; Watson, Jean-Paul

    2003-08-01

    Iterated local search, or ILS, is among the most straightforward meta-heuristics for local search. ILS employs both small-step and large-step move operators. Search proceeds via iterative modifications to a single solution, in distinct alternating phases. In the first phase, local neighborhood search (typically greedy descent) is used in conjunction with the small-step operator to transform solutions into local optima. In the second phase, the large-step operator is applied to generate perturbations to the local optima obtained in the first phase. Ideally, when local neighborhood search is applied to the resulting solution, search will terminate at a different local optimum, i.e.,more » the large-step perturbations should be sufficiently large to enable escape from the attractor basins of local optima. ILS has proven capable of delivering excellent performance on numerous N P-Hard optimization problems. [LMS03]. However, despite its implicity, very little is known about why ILS can be so effective, and under what conditions. The goal of this paper is to advance the state-of-the-art in the analysis of meta-heuristics, by providing answers to this research question. They focus on characterizing both the relationship between the structure of the underlying search space and ILS performance, and the dynamic behavior of ILS. The analysis proceeds in the context of the job-shop scheduling problem (JSP) [Tai94]. They begin by demonstrating that the attractor basins of local optima in the JSP are surprisingly weak, and can be escaped with high probaiblity by accepting a short random sequence of less-fit neighbors. this result is used to develop a new ILS algorithms for the JSP, I-JAR, whose performance is competitive with tabu search on difficult benchmark instances. They conclude by developing a very accurate behavioral model of I-JAR, which yields significant insights into the dynamics of search. The analysis is based on a set of 100 random 10 x 10 problem instances, in

  6. Optimization Models for Scheduling of Jobs

    PubMed Central

    Indika, S. H. Sathish; Shier, Douglas R.

    2006-01-01

    This work is motivated by a particular scheduling problem that is faced by logistics centers that perform aircraft maintenance and modification. Here we concentrate on a single facility (hangar) which is equipped with several work stations (bays). Specifically, a number of jobs have already been scheduled for processing at the facility; the starting times, durations, and work station assignments for these jobs are assumed to be known. We are interested in how best to schedule a number of new jobs that the facility will be processing in the near future. We first develop a mixed integer quadratic programming model (MIQP) for this problem. Since the exact solution of this MIQP formulation is time consuming, we develop a heuristic procedure, based on existing bin packing techniques. This heuristic is further enhanced by application of certain local optimality conditions. PMID:27274921

  7. Application of decentralized cooperative problem solving in dynamic flexible scheduling

    NASA Astrophysics Data System (ADS)

    Guan, Zai-Lin; Lei, Ming; Wu, Bo; Wu, Ya; Yang, Shuzi

    1995-08-01

    The object of this study is to discuss an intelligent solution to the problem of task-allocation in shop floor scheduling. For this purpose, the technique of distributed artificial intelligence (DAI) is applied. Intelligent agents (IAs) are used to realize decentralized cooperation, and negotiation is realized by using message passing based on the contract net model. Multiple agents, such as manager agents, workcell agents, and workstation agents, make game-like decisions based on multiple criteria evaluations. This procedure of decentralized cooperative problem solving makes local scheduling possible. And by integrating such multiple local schedules, dynamic flexible scheduling for the whole shop floor production can be realized.

  8. 48 CFR 536.570-9 - Shop drawings, coordination drawings, and schedules.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Shop drawings... CONTRACTS Contract Clauses 536.570-9 Shop drawings, coordination drawings, and schedules. Insert the clause at 552.236-78, Shop Drawings, Coordination Drawings, and Schedules, in solicitations and contracts if...

  9. 48 CFR 536.570-9 - Shop drawings, coordination drawings, and schedules.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Shop drawings... CONTRACTS Contract Clauses 536.570-9 Shop drawings, coordination drawings, and schedules. Insert the clause at 552.236-78, Shop Drawings, Coordination Drawings, and Schedules, in solicitations and contracts if...

  10. 48 CFR 536.570-9 - Shop drawings, coordination drawings, and schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Shop drawings... CONTRACTS Contract Clauses 536.570-9 Shop drawings, coordination drawings, and schedules. Insert the clause at 552.236-78, Shop Drawings, Coordination Drawings, and Schedules, in solicitations and contracts if...

  11. 48 CFR 536.570-9 - Shop drawings, coordination drawings, and schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Shop drawings... CONTRACTS Contract Clauses 536.570-9 Shop drawings, coordination drawings, and schedules. Insert the clause at 552.236-78, Shop Drawings, Coordination Drawings, and Schedules, in solicitations and contracts if...

  12. 48 CFR 536.570-9 - Shop drawings, coordination drawings, and schedules.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Shop drawings... CONTRACTS Contract Clauses 536.570-9 Shop drawings, coordination drawings, and schedules. Insert the clause at 552.236-78, Shop Drawings, Coordination Drawings, and Schedules, in solicitations and contracts if...

  13. Scheduling Non-Preemptible Jobs to Minimize Peak Demand

    DOE PAGES

    Yaw, Sean; Mumey, Brendan

    2017-10-28

    Our paper examines an important problem in smart grid energy scheduling; peaks in power demand are proportionally more expensive to generate and provision for. The issue is exacerbated in local microgrids that do not benefit from the aggregate smoothing experienced by large grids. Demand-side scheduling can reduce these peaks by taking advantage of the fact that there is often flexibility in job start times. We then focus attention on the case where the jobs are non-preemptible, meaning once started, they run to completion. The associated optimization problem is called the peak demand minimization problem, and has been previously shown tomore » be NP-hard. These results include an optimal fixed-parameter tractable algorithm, a polynomial-time approximation algorithm, as well as an effective heuristic that can also be used in an online setting of the problem. Simulation results show that these methods can reduce peak demand by up to 50% versus on-demand scheduling for household power jobs.« less

  14. Scheduling Non-Preemptible Jobs to Minimize Peak Demand

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yaw, Sean; Mumey, Brendan

    Our paper examines an important problem in smart grid energy scheduling; peaks in power demand are proportionally more expensive to generate and provision for. The issue is exacerbated in local microgrids that do not benefit from the aggregate smoothing experienced by large grids. Demand-side scheduling can reduce these peaks by taking advantage of the fact that there is often flexibility in job start times. We then focus attention on the case where the jobs are non-preemptible, meaning once started, they run to completion. The associated optimization problem is called the peak demand minimization problem, and has been previously shown tomore » be NP-hard. These results include an optimal fixed-parameter tractable algorithm, a polynomial-time approximation algorithm, as well as an effective heuristic that can also be used in an online setting of the problem. Simulation results show that these methods can reduce peak demand by up to 50% versus on-demand scheduling for household power jobs.« less

  15. Discrete harmony search algorithm for scheduling and rescheduling the reprocessing problems in remanufacturing: a case study

    NASA Astrophysics Data System (ADS)

    Gao, Kaizhou; Wang, Ling; Luo, Jianping; Jiang, Hua; Sadollah, Ali; Pan, Quanke

    2018-06-01

    In this article, scheduling and rescheduling problems with increasing processing time and new job insertion are studied for reprocessing problems in the remanufacturing process. To handle the unpredictability of reprocessing time, an experience-based strategy is used. Rescheduling strategies are applied for considering the effect of increasing reprocessing time and the new subassembly insertion. To optimize the scheduling and rescheduling objective, a discrete harmony search (DHS) algorithm is proposed. To speed up the convergence rate, a local search method is designed. The DHS is applied to two real-life cases for minimizing the maximum completion time and the mean of earliness and tardiness (E/T). These two objectives are also considered together as a bi-objective problem. Computational optimization results and comparisons show that the proposed DHS is able to solve the scheduling and rescheduling problems effectively and productively. Using the proposed approach, satisfactory optimization results can be achieved for scheduling and rescheduling on a real-life shop floor.

  16. 48 CFR 552.236-78 - Shop Drawings, Coordination Drawings, and Schedules.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Shop Drawings... Provisions and Clauses 552.236-78 Shop Drawings, Coordination Drawings, and Schedules. As prescribed in 536.570-9, insert the following clause: Shop Drawings, Coordination Drawings, and Schedules (SEP 1999) The...

  17. 48 CFR 552.236-78 - Shop Drawings, Coordination Drawings, and Schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Shop Drawings... Provisions and Clauses 552.236-78 Shop Drawings, Coordination Drawings, and Schedules. As prescribed in 536.570-9, insert the following clause: Shop Drawings, Coordination Drawings, and Schedules (SEP 1999) The...

  18. 48 CFR 552.236-78 - Shop Drawings, Coordination Drawings, and Schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Shop Drawings... Provisions and Clauses 552.236-78 Shop Drawings, Coordination Drawings, and Schedules. As prescribed in 536.570-9, insert the following clause: Shop Drawings, Coordination Drawings, and Schedules (SEP 1999) The...

  19. 48 CFR 552.236-78 - Shop Drawings, Coordination Drawings, and Schedules.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Shop Drawings... Provisions and Clauses 552.236-78 Shop Drawings, Coordination Drawings, and Schedules. As prescribed in 536.570-9, insert the following clause: Shop Drawings, Coordination Drawings, and Schedules (SEP 1999) The...

  20. 48 CFR 552.236-78 - Shop Drawings, Coordination Drawings, and Schedules.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Shop Drawings... Provisions and Clauses 552.236-78 Shop Drawings, Coordination Drawings, and Schedules. As prescribed in 536.570-9, insert the following clause: Shop Drawings, Coordination Drawings, and Schedules (SEP 1999) The...

  1. Scheduling Jobs with Variable Job Processing Times on Unrelated Parallel Machines

    PubMed Central

    Zhang, Guang-Qian; Wang, Jian-Jun; Liu, Ya-Jing

    2014-01-01

    m unrelated parallel machines scheduling problems with variable job processing times are considered, where the processing time of a job is a function of its position in a sequence, its starting time, and its resource allocation. The objective is to determine the optimal resource allocation and the optimal schedule to minimize a total cost function that dependents on the total completion (waiting) time, the total machine load, the total absolute differences in completion (waiting) times on all machines, and total resource cost. If the number of machines is a given constant number, we propose a polynomial time algorithm to solve the problem. PMID:24982933

  2. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  3. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  4. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  5. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  6. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  7. A discrete artificial bee colony algorithm incorporating differential evolution for the flow-shop scheduling problem with blocking

    NASA Astrophysics Data System (ADS)

    Han, Yu-Yan; Gong, Dunwei; Sun, Xiaoyan

    2015-07-01

    A flow-shop scheduling problem with blocking has important applications in a variety of industrial systems but is underrepresented in the research literature. In this study, a novel discrete artificial bee colony (ABC) algorithm is presented to solve the above scheduling problem with a makespan criterion by incorporating the ABC with differential evolution (DE). The proposed algorithm (DE-ABC) contains three key operators. One is related to the employed bee operator (i.e. adopting mutation and crossover operators of discrete DE to generate solutions with good quality); the second is concerned with the onlooker bee operator, which modifies the selected solutions using insert or swap operators based on the self-adaptive strategy; and the last is for the local search, that is, the insert-neighbourhood-based local search with a small probability is adopted to improve the algorithm's capability in exploitation. The performance of the proposed DE-ABC algorithm is empirically evaluated by applying it to well-known benchmark problems. The experimental results show that the proposed algorithm is superior to the compared algorithms in minimizing the makespan criterion.

  8. Simulation as a planning tool for job-shop production environment

    NASA Astrophysics Data System (ADS)

    Maram, Venkataramana; Nawawi, Mohd Kamal Bin Mohd; Rahman, Syariza Abdul; Sultan, Sultan Juma

    2015-12-01

    In this paper, we made an attempt to use discrete event simulation software ARENA® as a planning tool for job shop production environment. We considered job shop produces three types of Jigs with different sequence of operations to study and improve shop floor performance. The sole purpose of the study is to identifying options to improve machines utilization, reducing job waiting times at bottleneck machines. First, the performance of the existing system was evaluated by using ARENA®. Then identified improvement opportunities by analyzing base system results. Second, updated the model with most economical options. The proposed new system outperforms with that of the current base system by 816% improvement in delay times at paint shop by increase 2 to 3 and Jig cycle time reduces by Jig1 92%, Jig2 65% and Jig3 41% and hence new proposal was recommended.

  9. Due-Window Assignment Scheduling with Variable Job Processing Times

    PubMed Central

    Wu, Yu-Bin

    2015-01-01

    We consider a common due-window assignment scheduling problem jobs with variable job processing times on a single machine, where the processing time of a job is a function of its position in a sequence (i.e., learning effect) or its starting time (i.e., deteriorating effect). The problem is to determine the optimal due-windows, and the processing sequence simultaneously to minimize a cost function includes earliness, tardiness, the window location, window size, and weighted number of tardy jobs. We prove that the problem can be solved in polynomial time. PMID:25918745

  10. Advancing Air Force Scheduling through Modeling Problem Topologies

    DTIC Science & Technology

    2006-08-03

    Merrill on August 23, 2005 and corresponded with Major David Van Veldhuizen in Fall 2005 about obtaining data. 3.4.3 Transitions Analytical Graphics and...observation satellite orbit. Technical Report CRT-2003-27, Centre de recherche sur les transports, July 2003. [5] Van -Dat Cung. ROADEF 2003: Results of the...collaborateurs/etd/default.htm. January, 2004. [15] P.J.M van Laarhoven, E.H.L. Aarts, and J.K. Lenstra. Job shop scheduling by simulated annealing

  11. Batch Scheduling for Hybrid Assembly Differentiation Flow Shop to Minimize Total Actual Flow Time

    NASA Astrophysics Data System (ADS)

    Maulidya, R.; Suprayogi; Wangsaputra, R.; Halim, A. H.

    2018-03-01

    A hybrid assembly differentiation flow shop is a three-stage flow shop consisting of Machining, Assembly and Differentiation Stages and producing different types of products. In the machining stage, parts are processed in batches on different (unrelated) machines. In the assembly stage, each part of the different parts is assembled into an assembly product. Finally, the assembled products will further be processed into different types of final products in the differentiation stage. In this paper, we develop a batch scheduling model for a hybrid assembly differentiation flow shop to minimize the total actual flow time defined as the total times part spent in the shop floor from the arrival times until its due date. We also proposed a heuristic algorithm for solving the problems. The proposed algorithm is tested using a set of hypothetic data. The solution shows that the algorithm can solve the problems effectively.

  12. A meta-heuristic method for solving scheduling problem: crow search algorithm

    NASA Astrophysics Data System (ADS)

    Adhi, Antono; Santosa, Budi; Siswanto, Nurhadi

    2018-04-01

    Scheduling is one of the most important processes in an industry both in manufacturingand services. The scheduling process is the process of selecting resources to perform an operation on tasks. Resources can be machines, peoples, tasks, jobs or operations.. The selection of optimum sequence of jobs from a permutation is an essential issue in every research in scheduling problem. Optimum sequence becomes optimum solution to resolve scheduling problem. Scheduling problem becomes NP-hard problem since the number of job in the sequence is more than normal number can be processed by exact algorithm. In order to obtain optimum results, it needs a method with capability to solve complex scheduling problems in an acceptable time. Meta-heuristic is a method usually used to solve scheduling problem. The recently published method called Crow Search Algorithm (CSA) is adopted in this research to solve scheduling problem. CSA is an evolutionary meta-heuristic method which is based on the behavior in flocks of crow. The calculation result of CSA for solving scheduling problem is compared with other algorithms. From the comparison, it is found that CSA has better performance in term of optimum solution and time calculation than other algorithms.

  13. Car painting process scheduling with harmony search algorithm

    NASA Astrophysics Data System (ADS)

    Syahputra, M. F.; Maiyasya, A.; Purnamawati, S.; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Automotive painting program in the process of painting the car body by using robot power, making efficiency in the production system. Production system will be more efficient if pay attention to scheduling of car order which will be done by considering painting body shape of car. Flow shop scheduling is a scheduling model in which the job-job to be processed entirely flows in the same product direction / path. Scheduling problems often arise if there are n jobs to be processed on the machine, which must be specified which must be done first and how to allocate jobs on the machine to obtain a scheduled production process. Harmony Search Algorithm is a metaheuristic optimization algorithm based on music. The algorithm is inspired by observations that lead to music in search of perfect harmony. This musical harmony is in line to find optimal in the optimization process. Based on the tests that have been done, obtained the optimal car sequence with minimum makespan value.

  14. Solving a Production Scheduling Problem by Means of Two Biobjective Metaheuristic Procedures

    NASA Astrophysics Data System (ADS)

    Toncovich, Adrián; Oliveros Colay, María José; Moreno, José María; Corral, Jiménez; Corral, Rafael

    2009-11-01

    Production planning and scheduling problems emphasize the need for the availability of management tools that can help to assure proper service levels to customers, maintaining, at the same time, the production costs at acceptable levels and maximizing the utilization of the production facilities. In this case, a production scheduling problem that arises in the context of the activities of a company dedicated to the manufacturing of furniture for children and teenagers is addressed. Two bicriteria metaheuristic procedures are proposed to solve the sequencing problem in a production equipment that constitutes the bottleneck of the production process of the company. The production scheduling problem can be characterized as a general flow shop with sequence dependant setup times and additional inventory constraints. Two objectives are simultaneously taken into account when the quality of the candidate solutions is evaluated: the minimization of completion time of all jobs, or makespan, and the minimization of the total flow time of all jobs. Both procedures are based on a local search strategy that responds to the structure of the simulated annealing metaheuristic. In this case, both metaheuristic approaches generate a set of solutions that provides an approximation to the optimal Pareto front. In order to evaluate the performance of the proposed techniques a series of experiments was conducted. After analyzing the results, it can be said that the solutions provided by both approaches are adequate from the viewpoint of the quality as well as the computational effort involved in their generation. Nevertheless, a further refinement of the proposed procedures should be implemented with the aim of facilitating a quasi-automatic definition of the solution parameters.

  15. Competitive two-agent scheduling problems to minimize the weighted combination of makespans in a two-machine open shop

    NASA Astrophysics Data System (ADS)

    Jiang, Fuhong; Zhang, Xingong; Bai, Danyu; Wu, Chin-Chia

    2018-04-01

    In this article, a competitive two-agent scheduling problem in a two-machine open shop is studied. The objective is to minimize the weighted sum of the makespans of two competitive agents. A complexity proof is presented for minimizing the weighted combination of the makespan of each agent if the weight α belonging to agent B is arbitrary. Furthermore, two pseudo-polynomial-time algorithms using the largest alternate processing time (LAPT) rule are presented. Finally, two approximation algorithms are presented if the weight is equal to one. Additionally, another approximation algorithm is presented if the weight is larger than one.

  16. An Optimization Model for Scheduling Problems with Two-Dimensional Spatial Resource Constraint

    NASA Technical Reports Server (NTRS)

    Garcia, Christopher; Rabadi, Ghaith

    2010-01-01

    Traditional scheduling problems involve determining temporal assignments for a set of jobs in order to optimize some objective. Some scheduling problems also require the use of limited resources, which adds another dimension of complexity. In this paper we introduce a spatial resource-constrained scheduling problem that can arise in assembly, warehousing, cross-docking, inventory management, and other areas of logistics and supply chain management. This scheduling problem involves a twodimensional rectangular area as a limited resource. Each job, in addition to having temporal requirements, has a width and a height and utilizes a certain amount of space inside the area. We propose an optimization model for scheduling the jobs while respecting all temporal and spatial constraints.

  17. Environment-Aware Production Scheduling for Paint Shops in Automobile Manufacturing: A Multi-Objective Optimization Approach

    PubMed Central

    Zhang, Rui

    2017-01-01

    The traditional way of scheduling production processes often focuses on profit-driven goals (such as cycle time or material cost) while tending to overlook the negative impacts of manufacturing activities on the environment in the form of carbon emissions and other undesirable by-products. To bridge the gap, this paper investigates an environment-aware production scheduling problem that arises from a typical paint shop in the automobile manufacturing industry. In the studied problem, an objective function is defined to minimize the emission of chemical pollutants caused by the cleaning of painting devices which must be performed each time before a color change occurs. Meanwhile, minimization of due date violations in the downstream assembly shop is also considered because the two shops are interrelated and connected by a limited-capacity buffer. First, we have developed a mixed-integer programming formulation to describe this bi-objective optimization problem. Then, to solve problems of practical size, we have proposed a novel multi-objective particle swarm optimization (MOPSO) algorithm characterized by problem-specific improvement strategies. A branch-and-bound algorithm is designed for accurately assessing the most promising solutions. Finally, extensive computational experiments have shown that the proposed MOPSO is able to match the solution quality of an exact solver on small instances and outperform two state-of-the-art multi-objective optimizers in literature on large instances with up to 200 cars. PMID:29295603

  18. A new Nawaz-Enscore-Ham-based heuristic for permutation flow-shop problems with bicriteria of makespan and machine idle time

    NASA Astrophysics Data System (ADS)

    Liu, Weibo; Jin, Yan; Price, Mark

    2016-10-01

    A new heuristic based on the Nawaz-Enscore-Ham algorithm is proposed in this article for solving a permutation flow-shop scheduling problem. A new priority rule is proposed by accounting for the average, mean absolute deviation, skewness and kurtosis, in order to fully describe the distribution style of processing times. A new tie-breaking rule is also introduced for achieving effective job insertion with the objective of minimizing both makespan and machine idle time. Statistical tests illustrate better solution quality of the proposed algorithm compared to existing benchmark heuristics.

  19. A Genetic Algorithm for Flow Shop Scheduling with Assembly Operations to Minimize Makespan

    NASA Astrophysics Data System (ADS)

    Bhongade, A. S.; Khodke, P. M.

    2014-04-01

    Manufacturing systems, in which, several parts are processed through machining workstations and later assembled to form final products, is common. Though scheduling of such problems are solved using heuristics, available solution approaches can provide solution for only moderate sized problems due to large computation time required. In this work, scheduling approach is developed for such flow-shop manufacturing system having machining workstations followed by assembly workstations. The initial schedule is generated using Disjunctive method and genetic algorithm (GA) is applied further for generating schedule for large sized problems. GA is found to give near optimal solution based on the deviation of makespan from lower bound. The lower bound of makespan of such problem is estimated and percent deviation of makespan from lower bounds is used as a performance measure to evaluate the schedules. Computational experiments are conducted on problems developed using fractional factorial orthogonal array, varying the number of parts per product, number of products, and number of workstations (ranging upto 1,520 number of operations). A statistical analysis indicated the significance of all the three factors considered. It is concluded that GA method can obtain optimal makespan.

  20. A Novel Particle Swarm Optimization Approach for Grid Job Scheduling

    NASA Astrophysics Data System (ADS)

    Izakian, Hesam; Tork Ladani, Behrouz; Zamanifar, Kamran; Abraham, Ajith

    This paper represents a Particle Swarm Optimization (PSO) algorithm, for grid job scheduling. PSO is a population-based search algorithm based on the simulation of the social behavior of bird flocking and fish schooling. Particles fly in problem search space to find optimal or near-optimal solutions. In this paper we used a PSO approach for grid job scheduling. The scheduler aims at minimizing makespan and flowtime simultaneously. Experimental studies show that the proposed novel approach is more efficient than the PSO approach reported in the literature.

  1. Scheduling periodic jobs that allow imprecise results

    NASA Technical Reports Server (NTRS)

    Chung, Jen-Yao; Liu, Jane W. S.; Lin, Kwei-Jay

    1990-01-01

    The problem of scheduling periodic jobs in hard real-time systems that support imprecise computations is discussed. Two workload models of imprecise computations are presented. These models differ from traditional models in that a task may be terminated any time after it has produced an acceptable result. Each task is logically decomposed into a mandatory part followed by an optional part. In a feasible schedule, the mandatory part of every task is completed before the deadline of the task. The optional part refines the result produced by the mandatory part to reduce the error in the result. Applications are classified as type N and type C, according to undesirable effects of errors. The two workload models characterize the two types of applications. The optional parts of the tasks in an N job need not ever be completed. The resulting quality of each type-N job is measured in terms of the average error in the results over several consecutive periods. A class of preemptive, priority-driven algorithms that leads to feasible schedules with small average error is described and evaluated.

  2. Scheduling real-time, periodic jobs using imprecise results

    NASA Technical Reports Server (NTRS)

    Liu, Jane W. S.; Lin, Kwei-Jay; Natarajan, Swaminathan

    1987-01-01

    A process is called a monotone process if the accuracy of its intermediate results is non-decreasing as more time is spent to obtain the result. The result produced by a monotone process upon its normal termination is the desired result; the error in this result is zero. External events such as timeouts or crashes may cause the process to terminate prematurely. If the intermediate result produced by the process upon its premature termination is saved and made available, the application may still find the result unusable and, hence, acceptable; such a result is said to be an imprecise one. The error in an imprecise result is nonzero. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. This problem differs from the traditional scheduling problems since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result. Consequently, the amounts of processor time assigned to tasks in a valid schedule can be less than the amounts of time required to complete the tasks. A meaningful formulation of this problem taking into account the quality of the overall result is discussed. Three algorithms for scheduling jobs for which the effects of errors in results produced in different periods are not cumulative are described, and their relative merits are evaluated.

  3. Estimation of distribution algorithm with path relinking for the blocking flow-shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Shao, Zhongshi; Pi, Dechang; Shao, Weishi

    2018-05-01

    This article presents an effective estimation of distribution algorithm, named P-EDA, to solve the blocking flow-shop scheduling problem (BFSP) with the makespan criterion. In the P-EDA, a Nawaz-Enscore-Ham (NEH)-based heuristic and the random method are combined to generate the initial population. Based on several superior individuals provided by a modified linear rank selection, a probabilistic model is constructed to describe the probabilistic distribution of the promising solution space. The path relinking technique is incorporated into EDA to avoid blindness of the search and improve the convergence property. A modified referenced local search is designed to enhance the local exploitation. Moreover, a diversity-maintaining scheme is introduced into EDA to avoid deterioration of the population. Finally, the parameters of the proposed P-EDA are calibrated using a design of experiments approach. Simulation results and comparisons with some well-performing algorithms demonstrate the effectiveness of the P-EDA for solving BFSP.

  4. Shopping Problems among High School Students

    PubMed Central

    Grant, Jon E.; Potenza, Marc N.; Krishnan-Sarin, Suchitra; Cavallo, Dana A.; Desai, Rani A.

    2010-01-01

    Background Although shopping behavior among adolescents is normal, for some the shopping becomes problematic. An assessment of adolescent shopping behavior along a continuum of severity and its relationship to other behaviors and health issues is incompletely understood. Methods A large sample of high school students (n=3999) was examined using a self-report survey with 153 questions concerning demographic characteristics, shopping behaviors, other health behaviors including substance use, and functioning variables such as grades and violent behavior. Results The overall prevalence of problem shopping was 3.5% (95%CI: 2.93–4.07). Regular smoking, marijuana and other drug use, sadness and hopelessness, and antisocial behaviors (e.g., fighting, carrying weapons) were associated with problem shopping behavior in both boys and girls. Heavy alcohol use was significantly associated with problem shopping only in girls. Conclusion Problem shopping appears fairly common among high school students and is associated with symptoms of depression and a range of potentially addictive and antisocial behaviors. Significant distress and diminished behavioral control suggest that excessive shopping may often have significant associated morbidity. Additional research is needed to develop specific prevention and treatment strategies for adolescents who report problems with shopping. PMID:21497217

  5. Shopping problems among high school students.

    PubMed

    Grant, Jon E; Potenza, Marc N; Krishnan-Sarin, Suchitra; Cavallo, Dana A; Desai, Rani A

    2011-01-01

    Although shopping behavior among adolescents is normal, for some, the shopping becomes problematic. An assessment of adolescent shopping behavior along a continuum of severity and its relationship to other behaviors and health issues is incompletely understood. A large sample of high school students (n = 3999) was examined using a self-report survey with 153 questions concerning demographic characteristics, shopping behaviors, other health behaviors including substance use, and functioning variables such as grades and violent behavior. The overall prevalence of problem shopping was 3.5% (95% CI, 2.93-4.07). Regular smoking, marijuana and other drug use, sadness and hopelessness, and antisocial behaviors (e.g., fighting, carrying weapons) were associated with problem shopping behavior in both boys and girls. Heavy alcohol use was significantly associated with problem shopping only in girls. Problem shopping appears fairly common among high school students and is associated with symptoms of depression and a range of potentially addictive and antisocial behaviors. Significant distress and diminished behavioral control suggest that excessive shopping may often have significant associated morbidity. Additional research is needed to develop specific prevention and treatment strategies for adolescents who report problems with shopping. Copyright © 2011 Elsevier Inc. All rights reserved.

  6. Job Scheduling Under the Portable Batch System

    NASA Technical Reports Server (NTRS)

    Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)

    1995-01-01

    The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

  7. A Multiple Ant Colony Metahuristic for the Air Refueling Tanker Assignment Problem

    DTIC Science & Technology

    2002-03-01

    Problem The tanker assignment problem can be modeled as a job shop scheduling problem ( JSSP ). The JSSP is made up of n jobs, composed of m ordered...points) to be processed on all the machines (tankers). The problem with using JSSP is that the tanker assignment problem has multiple objectives... JSSP will minimize the time it takes for all jobs, but this may take an inordinate number of tankers. Thus using JSSP alone is not necessarily a good

  8. Single-machine group scheduling problems with deteriorating and learning effect

    NASA Astrophysics Data System (ADS)

    Xingong, Zhang; Yong, Wang; Shikun, Bai

    2016-07-01

    The concepts of deteriorating jobs and learning effects have been individually studied in many scheduling problems. However, most studies considering the deteriorating and learning effects ignore the fact that production efficiency can be increased by grouping various parts and products with similar designs and/or production processes. This phenomenon is known as 'group technology' in the literature. In this paper, a new group scheduling model with deteriorating and learning effects is proposed, where learning effect depends not only on job position, but also on the position of the corresponding job group; deteriorating effect depends on its starting time of the job. This paper shows that the makespan and the total completion time problems remain polynomial optimal solvable under the proposed model. In addition, a polynomial optimal solution is also presented to minimise the maximum lateness problem under certain agreeable restriction.

  9. Single machine total completion time minimization scheduling with a time-dependent learning effect and deteriorating jobs

    NASA Astrophysics Data System (ADS)

    Wang, Ji-Bo; Wang, Ming-Zheng; Ji, Ping

    2012-05-01

    In this article, we consider a single machine scheduling problem with a time-dependent learning effect and deteriorating jobs. By the effects of time-dependent learning and deterioration, we mean that the job processing time is defined by a function of its starting time and total normal processing time of jobs in front of it in the sequence. The objective is to determine an optimal schedule so as to minimize the total completion time. This problem remains open for the case of -1 < a < 0, where a denotes the learning index; we show that an optimal schedule of the problem is V-shaped with respect to job normal processing times. Three heuristic algorithms utilising the V-shaped property are proposed, and computational experiments show that the last heuristic algorithm performs effectively and efficiently in obtaining near-optimal solutions.

  10. Job-shop scheduling applied to computer vision

    NASA Astrophysics Data System (ADS)

    Sebastian y Zuniga, Jose M.; Torres-Medina, Fernando; Aracil, Rafael; Reinoso, Oscar; Jimenez, Luis M.; Garcia, David

    1997-09-01

    This paper presents a method for minimizing the total elapsed time spent by n tasks running on m differents processors working in parallel. The developed algorithm not only minimizes the total elapsed time but also reduces the idle time and waiting time of in-process tasks. This condition is very important in some applications of computer vision in which the time to finish the total process is particularly critical -- quality control in industrial inspection, real- time computer vision, guided robots. The scheduling algorithm is based on the use of two matrices, obtained from the precedence relationships between tasks, and the data obtained from the two matrices. The developed scheduling algorithm has been tested in one application of quality control using computer vision. The results obtained have been satisfactory in the application of different image processing algorithms.

  11. An expert system for planning and scheduling in a telerobotic environment

    NASA Technical Reports Server (NTRS)

    Ntuen, Celestine A.; Park, Eui H.

    1991-01-01

    A knowledge based approach to assigning tasks to multi-agents working cooperatively in jobs that require a telerobot in the loop was developed. The generality of the approach allows for such a concept to be applied in a nonteleoperational domain. The planning architecture known as the task oriented planner (TOP) uses the principle of flow mechanism and the concept of planning by deliberation to preserve and use knowledge about a particular task. The TOP is an open ended architecture developed with a NEXPERT expert system shell and its knowledge organization allows for indirect consultation at various levels of task abstraction. Considering that a telerobot operates in a hostile and nonstructured environment, task scheduling should respond to environmental changes. A general heuristic was developed for scheduling jobs with the TOP system. The technique is not to optimize a given scheduling criterion as in classical job and/or flow shop problems. For a teleoperation job schedule, criteria are situation dependent. A criterion selection is fuzzily embedded in the task-skill matrix computation. However, goal achievement with minimum expected risk to the human operator is emphasized.

  12. Optimal recombination in genetic algorithms for flowshop scheduling problems

    NASA Astrophysics Data System (ADS)

    Kovalenko, Julia

    2016-10-01

    The optimal recombination problem consists in finding the best possible offspring as a result of a recombination operator in a genetic algorithm, given two parent solutions. We prove NP-hardness of the optimal recombination for various variants of the flowshop scheduling problem with makespan criterion and criterion of maximum lateness. An algorithm for solving the optimal recombination problem for permutation flowshop problems is built, using enumeration of prefect matchings in a special bipartite graph. The algorithm is adopted for the classical flowshop scheduling problem and for the no-wait flowshop problem. It is shown that the optimal recombination problem for the permutation flowshop scheduling problem is solvable in polynomial time for almost all pairs of parent solutions as the number of jobs tends to infinity.

  13. It's a Mall, Mall, Mall, Mall World: Jobs in Shopping Malls.

    ERIC Educational Resources Information Center

    Green, Kathleen

    1996-01-01

    Provides information about a variety of nonsales jobs available in shopping malls: mall management, customer service, marketing, operations, security, maintenance, and administration. Includes information about educational requirements. (JOW)

  14. An effective PSO-based memetic algorithm for flow shop scheduling.

    PubMed

    Liu, Bo; Wang, Ling; Jin, Yi-Hui

    2007-02-01

    This paper proposes an effective particle swarm optimization (PSO)-based memetic algorithm (MA) for the permutation flow shop scheduling problem (PFSSP) with the objective to minimize the maximum completion time, which is a typical non-deterministic polynomial-time (NP) hard combinatorial optimization problem. In the proposed PSO-based MA (PSOMA), both PSO-based searching operators and some special local searching operators are designed to balance the exploration and exploitation abilities. In particular, the PSOMA applies the evolutionary searching mechanism of PSO, which is characterized by individual improvement, population cooperation, and competition to effectively perform exploration. On the other hand, the PSOMA utilizes several adaptive local searches to perform exploitation. First, to make PSO suitable for solving PFSSP, a ranked-order value rule based on random key representation is presented to convert the continuous position values of particles to job permutations. Second, to generate an initial swarm with certain quality and diversity, the famous Nawaz-Enscore-Ham (NEH) heuristic is incorporated into the initialization of population. Third, to balance the exploration and exploitation abilities, after the standard PSO-based searching operation, a new local search technique named NEH_1 insertion is probabilistically applied to some good particles selected by using a roulette wheel mechanism with a specified probability. Fourth, to enrich the searching behaviors and to avoid premature convergence, a simulated annealing (SA)-based local search with multiple different neighborhoods is designed and incorporated into the PSOMA. Meanwhile, an effective adaptive meta-Lamarckian learning strategy is employed to decide which neighborhood to be used in SA-based local search. Finally, to further enhance the exploitation ability, a pairwise-based local search is applied after the SA-based search. Simulation results based on benchmarks demonstrate the effectiveness

  15. Application of a hybrid generation/utility assessment heuristic to a class of scheduling problems

    NASA Technical Reports Server (NTRS)

    Heyward, Ann O.

    1989-01-01

    A two-stage heuristic solution approach for a class of multiobjective, n-job, 1-machine scheduling problems is described. Minimization of job-to-job interference for n jobs is sought. The first stage generates alternative schedule sequences by interchanging pairs of schedule elements. The set of alternative sequences can represent nodes of a decision tree; each node is reached via decision to interchange job elements. The second stage selects the parent node for the next generation of alternative sequences through automated paired comparison of objective performance for all current nodes. An application of the heuristic approach to communications satellite systems planning is presented.

  16. A multipopulation PSO based memetic algorithm for permutation flow shop scheduling.

    PubMed

    Liu, Ruochen; Ma, Chenlin; Ma, Wenping; Li, Yangyang

    2013-01-01

    The permutation flow shop scheduling problem (PFSSP) is part of production scheduling, which belongs to the hardest combinatorial optimization problem. In this paper, a multipopulation particle swarm optimization (PSO) based memetic algorithm (MPSOMA) is proposed in this paper. In the proposed algorithm, the whole particle swarm population is divided into three subpopulations in which each particle evolves itself by the standard PSO and then updates each subpopulation by using different local search schemes such as variable neighborhood search (VNS) and individual improvement scheme (IIS). Then, the best particle of each subpopulation is selected to construct a probabilistic model by using estimation of distribution algorithm (EDA) and three particles are sampled from the probabilistic model to update the worst individual in each subpopulation. The best particle in the entire particle swarm is used to update the global optimal solution. The proposed MPSOMA is compared with two recently proposed algorithms, namely, PSO based memetic algorithm (PSOMA) and hybrid particle swarm optimization with estimation of distribution algorithm (PSOEDA), on 29 well-known PFFSPs taken from OR-library, and the experimental results show that it is an effective approach for the PFFSP.

  17. A Multipopulation PSO Based Memetic Algorithm for Permutation Flow Shop Scheduling

    PubMed Central

    Liu, Ruochen; Ma, Chenlin; Ma, Wenping; Li, Yangyang

    2013-01-01

    The permutation flow shop scheduling problem (PFSSP) is part of production scheduling, which belongs to the hardest combinatorial optimization problem. In this paper, a multipopulation particle swarm optimization (PSO) based memetic algorithm (MPSOMA) is proposed in this paper. In the proposed algorithm, the whole particle swarm population is divided into three subpopulations in which each particle evolves itself by the standard PSO and then updates each subpopulation by using different local search schemes such as variable neighborhood search (VNS) and individual improvement scheme (IIS). Then, the best particle of each subpopulation is selected to construct a probabilistic model by using estimation of distribution algorithm (EDA) and three particles are sampled from the probabilistic model to update the worst individual in each subpopulation. The best particle in the entire particle swarm is used to update the global optimal solution. The proposed MPSOMA is compared with two recently proposed algorithms, namely, PSO based memetic algorithm (PSOMA) and hybrid particle swarm optimization with estimation of distribution algorithm (PSOEDA), on 29 well-known PFFSPs taken from OR-library, and the experimental results show that it is an effective approach for the PFFSP. PMID:24453841

  18. Meta-RaPS Algorithm for the Aerial Refueling Scheduling Problem

    NASA Technical Reports Server (NTRS)

    Kaplan, Sezgin; Arin, Arif; Rabadi, Ghaith

    2011-01-01

    The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on multiple tankers (machines). ARSP assumes that jobs have different release times and due dates, The total weighted tardiness is used to evaluate schedule's quality. Therefore, ARSP can be modeled as a parallel machine scheduling with release limes and due dates to minimize the total weighted tardiness. Since ARSP is NP-hard, it will be more appropriate to develop a pproimate or heuristic algorithm to obtain solutions in reasonable computation limes. In this paper, Meta-Raps-ATC algorithm is implemented to create high quality solutions. Meta-RaPS (Meta-heuristic for Randomized Priority Search) is a recent and promising meta heuristic that is applied by introducing randomness to a construction heuristic. The Apparent Tardiness Rule (ATC), which is a good rule for scheduling problems with tardiness objective, is used to construct initial solutions which are improved by an exchanging operation. Results are presented for generated instances.

  19. Some single-machine scheduling problems with learning effects and two competing agents.

    PubMed

    Li, Hongjie; Li, Zeyuan; Yin, Yunqiang

    2014-01-01

    This study considers a scheduling environment in which there are two agents and a set of jobs, each of which belongs to one of the two agents and its actual processing time is defined as a decreasing linear function of its starting time. Each of the two agents competes to process its respective jobs on a single machine and has its own scheduling objective to optimize. The objective is to assign the jobs so that the resulting schedule performs well with respect to the objectives of both agents. The objective functions addressed in this study include the maximum cost, the total weighted completion time, and the discounted total weighted completion time. We investigate three problems arising from different combinations of the objectives of the two agents. The computational complexity of the problems is discussed and solution algorithms where possible are presented.

  20. Decomposition of timed automata for solving scheduling problems

    NASA Astrophysics Data System (ADS)

    Nishi, Tatsushi; Wakatake, Masato

    2014-03-01

    A decomposition algorithm for scheduling problems based on timed automata (TA) model is proposed. The problem is represented as an optimal state transition problem for TA. The model comprises of the parallel composition of submodels such as jobs and resources. The procedure of the proposed methodology can be divided into two steps. The first step is to decompose the TA model into several submodels by using decomposable condition. The second step is to combine individual solution of subproblems for the decomposed submodels by the penalty function method. A feasible solution for the entire model is derived through the iterated computation of solving the subproblem for each submodel. The proposed methodology is applied to solve flowshop and jobshop scheduling problems. Computational experiments demonstrate the effectiveness of the proposed algorithm compared with a conventional TA scheduling algorithm without decomposition.

  1. A Suggested Set of Job and Task Sheets for Machine Shop Training.

    ERIC Educational Resources Information Center

    Texas A and M Univ., College Station. Vocational Instructional Services.

    This set of job and task sheets consists of three multi-part jobs that are adaptable for use in regular vocational industrial education programs for training machinists and machine shop operators. After completing the sheets included in this volume, students should be able to construct a planer jack, a radius cutter, and a surface gage. Each job…

  2. An electromagnetism-like metaheuristic for open-shop problems with no buffer

    NASA Astrophysics Data System (ADS)

    Naderi, Bahman; Najafi, Esmaeil; Yazdani, Mehdi

    2012-12-01

    This paper considers open-shop scheduling with no intermediate buffer to minimize total tardiness. This problem occurs in many production settings, in the plastic molding, chemical, and food processing industries. The paper mathematically formulates the problem by a mixed integer linear program. The problem can be optimally solved by the model. The paper also develops a novel metaheuristic based on an electromagnetism algorithm to solve the large-sized problems. The paper conducts two computational experiments. The first includes small-sized instances by which the mathematical model and general performance of the proposed metaheuristic are evaluated. The second evaluates the metaheuristic for its performance to solve some large-sized instances. The results show that the model and algorithm are effective to deal with the problem.

  3. A parallel-machine scheduling problem with two competing agents

    NASA Astrophysics Data System (ADS)

    Lee, Wen-Chiung; Chung, Yu-Hsiang; Wang, Jen-Ya

    2017-06-01

    Scheduling with two competing agents has become popular in recent years. Most of the research has focused on single-machine problems. This article considers a parallel-machine problem, the objective of which is to minimize the total completion time of jobs from the first agent given that the maximum tardiness of jobs from the second agent cannot exceed an upper bound. The NP-hardness of this problem is also examined. A genetic algorithm equipped with local search is proposed to search for the near-optimal solution. Computational experiments are conducted to evaluate the proposed genetic algorithm.

  4. Comparison of multiobjective evolutionary algorithms for operations scheduling under machine availability constraints.

    PubMed

    Frutos, M; Méndez, M; Tohmé, F; Broz, D

    2013-01-01

    Many of the problems that arise in production systems can be handled with multiobjective techniques. One of those problems is that of scheduling operations subject to constraints on the availability of machines and buffer capacity. In this paper we analyze different Evolutionary multiobjective Algorithms (MOEAs) for this kind of problems. We consider an experimental framework in which we schedule production operations for four real world Job-Shop contexts using three algorithms, NSGAII, SPEA2, and IBEA. Using two performance indexes, Hypervolume and R2, we found that SPEA2 and IBEA are the most efficient for the tasks at hand. On the other hand IBEA seems to be a better choice of tool since it yields more solutions in the approximate Pareto frontier.

  5. Comparison of Multiobjective Evolutionary Algorithms for Operations Scheduling under Machine Availability Constraints

    PubMed Central

    Frutos, M.; Méndez, M.; Tohmé, F.; Broz, D.

    2013-01-01

    Many of the problems that arise in production systems can be handled with multiobjective techniques. One of those problems is that of scheduling operations subject to constraints on the availability of machines and buffer capacity. In this paper we analyze different Evolutionary multiobjective Algorithms (MOEAs) for this kind of problems. We consider an experimental framework in which we schedule production operations for four real world Job-Shop contexts using three algorithms, NSGAII, SPEA2, and IBEA. Using two performance indexes, Hypervolume and R2, we found that SPEA2 and IBEA are the most efficient for the tasks at hand. On the other hand IBEA seems to be a better choice of tool since it yields more solutions in the approximate Pareto frontier. PMID:24489502

  6. Prevalence of job strain among Indian foundry shop floor workers.

    PubMed

    Mohan, G Madhan; Elangovan, S; Prasad, P S S; Krishna, P Rama; Mokkapati, Anil Kumar

    2008-01-01

    Global competition in manufacturing sector demand higher productivity levels. In this context, workers in this sector are set with high output targets, leading to job strain. In addition to the strain, hazardous conditions also prevail in some of the manufacturing processes like foundry activities. This paper attempts to appraise the prevalence of job strain among foundry shop floor workers in India with the help of Demands-Control model [8]. In this study, data was collected through a survey using 49-item Job Content Questionnaire (JCQ) [9], a widely used and well-validated test for job strain. Then the data was subjected to statistical analysis after ascertaining the reliability. This survey has revealed that 25% of workers in foundry were experiencing high job strain. Hazardous working conditions, limited decision making authority, etc. appear to be the main contributing factors for the higher levels of strain.

  7. Shopping for Jobs: Mall Internship Program Opens Doors for HVAC Students.

    ERIC Educational Resources Information Center

    Nolot, Terry

    1995-01-01

    Ivy Tech State College uses River Falls, a shopping mall, as an enormous heating, ventilation, and air conditioning laboratory. Students spend Saturdays working with full-time technicians getting invaluable training and experience. Students see the program as a professional opportunity and a direct route to jobs. (JOW)

  8. Data location-aware job scheduling in the grid. Application to the GridWay metascheduler

    NASA Astrophysics Data System (ADS)

    Delgado Peris, Antonio; Hernandez, Jose; Huedo, Eduardo; Llorente, Ignacio M.

    2010-04-01

    Grid infrastructures constitute nowadays the core of the computing facilities of the biggest LHC experiments. These experiments produce and manage petabytes of data per year and run thousands of computing jobs every day to process that data. It is the duty of metaschedulers to allocate the tasks to the most appropriate resources at the proper time. Our work reviews the policies that have been proposed for the scheduling of grid jobs in the context of very data-intensive applications. We indicate some of the practical problems that such models will face and describe what we consider essential characteristics of an optimum scheduling system: aim to minimise not only job turnaround time but also data replication, flexibility to support different virtual organisation requirements and capability to coordinate the tasks of data placement and job allocation while keeping their execution decoupled. These ideas have guided the development of an enhanced prototype for GridWay, a general purpose metascheduler, part of the Globus Toolkit and member of the EGEE's RESPECT program. Current GridWay's scheduling algorithm is unaware of data location. Our prototype makes it possible for job requests to set data needs not only as absolute requirements but also as functions for resource ranking. As our tests show, this makes it more flexible than currently used resource brokers to implement different data-aware scheduling algorithms.

  9. Incentive Compatible Online Scheduling of Malleable Parallel Jobs with Individual Deadlines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carroll, Thomas E.; Grosu, Daniel

    2010-09-13

    We consider the online scheduling of malleable jobs on parallel systems, such as clusters, symmetric multiprocessing computers, and multi-core processor computers. Malleable jobs is a model of parallel processing in which jobs adapt to the number of processors assigned to them. This model permits the scheduler and resource manager to make more efficient use of the available resources. Each malleable job is characterized by arrival time, deadline, and value. If the job completes by its deadline, the user earns the payoff indicated by the value; otherwise, she earns a payoff of zero. The scheduling objective is to maximize the summore » of the values of the jobs that complete by their associated deadlines. Complicating the matter is that users in the real world are rational and they will attempt to manipulate the scheduler by misreporting their jobs’ parameters if it benefits them to do so. To mitigate this behavior, we design an incentive compatible online scheduling mechanism. Incentive compatibility assures us that the users will obtain the maximum payoff only if they truthfully report their jobs’ parameters to the scheduler. Finally, we simulate and study the mechanism to show the effects of misreports on the cheaters and on the system.« less

  10. Fog computing job scheduling optimization based on bees swarm

    NASA Astrophysics Data System (ADS)

    Bitam, Salim; Zeadally, Sherali; Mellouk, Abdelhamid

    2018-04-01

    Fog computing is a new computing architecture, composed of a set of near-user edge devices called fog nodes, which collaborate together in order to perform computational services such as running applications, storing an important amount of data, and transmitting messages. Fog computing extends cloud computing by deploying digital resources at the premise of mobile users. In this new paradigm, management and operating functions, such as job scheduling aim at providing high-performance, cost-effective services requested by mobile users and executed by fog nodes. We propose a new bio-inspired optimization approach called Bees Life Algorithm (BLA) aimed at addressing the job scheduling problem in the fog computing environment. Our proposed approach is based on the optimized distribution of a set of tasks among all the fog computing nodes. The objective is to find an optimal tradeoff between CPU execution time and allocated memory required by fog computing services established by mobile users. Our empirical performance evaluation results demonstrate that the proposal outperforms the traditional particle swarm optimization and genetic algorithm in terms of CPU execution time and allocated memory.

  11. A genetic algorithm-based job scheduling model for big data analytics.

    PubMed

    Lu, Qinghua; Li, Shanshan; Zhang, Weishan; Zhang, Lei

    Big data analytics (BDA) applications are a new category of software applications that process large amounts of data using scalable parallel processing infrastructure to obtain hidden value. Hadoop is the most mature open-source big data analytics framework, which implements the MapReduce programming model to process big data with MapReduce jobs. Big data analytics jobs are often continuous and not mutually separated. The existing work mainly focuses on executing jobs in sequence, which are often inefficient and consume high energy. In this paper, we propose a genetic algorithm-based job scheduling model for big data analytics applications to improve the efficiency of big data analytics. To implement the job scheduling model, we leverage an estimation module to predict the performance of clusters when executing analytics jobs. We have evaluated the proposed job scheduling model in terms of feasibility and accuracy.

  12. Due Date Assignment in a Dynamic Job Shop with the Orthogonal Kernel Least Squares Algorithm

    NASA Astrophysics Data System (ADS)

    Yang, D. H.; Hu, L.; Qian, Y.

    2017-06-01

    Meeting due dates is a key goal in the manufacturing industries. This paper proposes a method for due date assignment (DDA) by using the Orthogonal Kernel Least Squares Algorithm (OKLSA). A simulation model is built to imitate the production process of a highly dynamic job shop. Several factors describing job characteristics and system state are extracted as attributes to predict job flow-times. A number of experiments under conditions of varying dispatching rules and 90% shop utilization level have been carried out to evaluate the effectiveness of OKLSA applied for DDA. The prediction performance of OKLSA is compared with those of five conventional DDA models and back-propagation neural network (BPNN). The experimental results indicate that OKLSA is statistically superior to other DDA models in terms of mean absolute lateness and root mean squares lateness in most cases. The only exception occurs when the shortest processing time rule is used for dispatching jobs, the difference between OKLSA and BPNN is not statistically significant.

  13. A self-organizing neural network for job scheduling in distributed systems

    NASA Astrophysics Data System (ADS)

    Newman, Harvey B.; Legrand, Iosif C.

    2001-08-01

    The aim of this work is to describe a possible approach for the optimization of the job scheduling in large distributed systems, based on a self-organizing Neural Network. This dynamic scheduling system should be seen as adaptive middle layer software, aware of current available resources and making the scheduling decisions using the "past experience." It aims to optimize job specific parameters as well as the resource utilization. The scheduling system is able to dynamically learn and cluster information in a large dimensional parameter space and at the same time to explore new regions in the parameters space. This self-organizing scheduling system may offer a possible solution to provide an effective use of resources for the off-line data processing jobs for future HEP experiments.

  14. Simultaneous Scheduling of Jobs, AGVs and Tools Considering Tool Transfer Times in Multi Machine FMS By SOS Algorithm

    NASA Astrophysics Data System (ADS)

    Sivarami Reddy, N.; Ramamurthy, D. V., Dr.; Prahlada Rao, K., Dr.

    2017-08-01

    This article addresses simultaneous scheduling of machines, AGVs and tools where machines are allowed to share the tools considering transfer times of jobs and tools between machines, to generate best optimal sequences that minimize makespan in a multi-machine Flexible Manufacturing System (FMS). Performance of FMS is expected to improve by effective utilization of its resources, by proper integration and synchronization of their scheduling. Symbiotic Organisms Search (SOS) algorithm is a potent tool which is a better alternative for solving optimization problems like scheduling and proven itself. The proposed SOS algorithm is tested on 22 job sets with makespan as objective for scheduling of machines and tools where machines are allowed to share tools without considering transfer times of jobs and tools and the results are compared with the results of existing methods. The results show that the SOS has outperformed. The same SOS algorithm is used for simultaneous scheduling of machines, AGVs and tools where machines are allowed to share tools considering transfer times of jobs and tools to determine the best optimal sequences that minimize makespan.

  15. Research on schedulers for astronomical observatories

    NASA Astrophysics Data System (ADS)

    Colome, Josep; Colomer, Pau; Guàrdia, Josep; Ribas, Ignasi; Campreciós, Jordi; Coiffard, Thierry; Gesa, Lluis; Martínez, Francesc; Rodler, Florian

    2012-09-01

    The main task of a scheduler applied to astronomical observatories is the time optimization of the facility and the maximization of the scientific return. Scheduling of astronomical observations is an example of the classical task allocation problem known as the job-shop problem (JSP), where N ideal tasks are assigned to M identical resources, while minimizing the total execution time. A problem of higher complexity, called the Flexible-JSP (FJSP), arises when the tasks can be executed by different resources, i.e. by different telescopes, and it focuses on determining a routing policy (i.e., which machine to assign for each operation) other than the traditional scheduling decisions (i.e., to determine the starting time of each operation). In most cases there is no single best approach to solve the planning system and, therefore, various mathematical algorithms (Genetic Algorithms, Ant Colony Optimization algorithms, Multi-Objective Evolutionary algorithms, etc.) are usually considered to adapt the application to the system configuration and task execution constraints. The scheduling time-cycle is also an important ingredient to determine the best approach. A shortterm scheduler, for instance, has to find a good solution with the minimum computation time, providing the system with the capability to adapt the selected task to varying execution constraints (i.e., environment conditions). We present in this contribution an analysis of the task allocation problem and the solutions currently in use at different astronomical facilities. We also describe the schedulers for three different projects (CTA, CARMENES and TJO) where the conclusions of this analysis are applied to develop a suitable routine.

  16. Scheduling with non-decreasing deterioration jobs and variable maintenance activities on a single machine

    NASA Astrophysics Data System (ADS)

    Zhang, Xingong; Yin, Yunqiang; Wu, Chin-Chia

    2017-01-01

    There is a situation found in many manufacturing systems, such as steel rolling mills, fire fighting or single-server cycle-queues, where a job that is processed later consumes more time than that same job when processed earlier. The research finds that machine maintenance can improve the worsening of processing conditions. After maintenance activity, the machine will be restored. The maintenance duration is a positive and non-decreasing differentiable convex function of the total processing times of the jobs between maintenance activities. Motivated by this observation, the makespan and the total completion time minimization problems in the scheduling of jobs with non-decreasing rates of job processing time on a single machine are considered in this article. It is shown that both the makespan and the total completion time minimization problems are NP-hard in the strong sense when the number of maintenance activities is arbitrary, while the makespan minimization problem is NP-hard in the ordinary sense when the number of maintenance activities is fixed. If the deterioration rates of the jobs are identical and the maintenance duration is a linear function of the total processing times of the jobs between maintenance activities, then this article shows that the group balance principle is satisfied for the makespan minimization problem. Furthermore, two polynomial-time algorithms are presented for solving the makespan problem and the total completion time problem under identical deterioration rates, respectively.

  17. A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes.

    PubMed

    Lee, I; Sikora, R; Shaw, M J

    1997-01-01

    Genetic algorithms (GAs) have been used widely for such combinatorial optimization problems as the traveling salesman problem (TSP), the quadratic assignment problem (QAP), and job shop scheduling. In all of these problems there is usually a well defined representation which GA's use to solve the problem. We present a novel approach for solving two related problems-lot sizing and sequencing-concurrently using GAs. The essence of our approach lies in the concept of using a unified representation for the information about both the lot sizes and the sequence and enabling GAs to evolve the chromosome by replacing primitive genes with good building blocks. In addition, a simulated annealing procedure is incorporated to further improve the performance. We evaluate the performance of applying the above approach to flexible flow line scheduling with variable lot sizes for an actual manufacturing facility, comparing it to such alternative approaches as pair wise exchange improvement, tabu search, and simulated annealing procedures. The results show the efficacy of this approach for flexible flow line scheduling.

  18. Multicore job scheduling in the Worldwide LHC Computing Grid

    NASA Astrophysics Data System (ADS)

    Forti, A.; Pérez-Calero Yzquierdo, A.; Hartmann, T.; Alef, M.; Lahiff, A.; Templon, J.; Dal Pra, S.; Gila, M.; Skipsey, S.; Acosta-Silva, C.; Filipcic, A.; Walker, R.; Walker, C. J.; Traynor, D.; Gadrat, S.

    2015-12-01

    After the successful first run of the LHC, data taking is scheduled to restart in Summer 2015 with experimental conditions leading to increased data volumes and event complexity. In order to process the data generated in such scenario and exploit the multicore architectures of current CPUs, the LHC experiments have developed parallelized software for data reconstruction and simulation. However, a good fraction of their computing effort is still expected to be executed as single-core tasks. Therefore, jobs with diverse resources requirements will be distributed across the Worldwide LHC Computing Grid (WLCG), making workload scheduling a complex problem in itself. In response to this challenge, the WLCG Multicore Deployment Task Force has been created in order to coordinate the joint effort from experiments and WLCG sites. The main objective is to ensure the convergence of approaches from the different LHC Virtual Organizations (VOs) to make the best use of the shared resources in order to satisfy their new computing needs, minimizing any inefficiency originated from the scheduling mechanisms, and without imposing unnecessary complexities in the way sites manage their resources. This paper describes the activities and progress of the Task Force related to the aforementioned topics, including experiences from key sites on how to best use different batch system technologies, the evolution of workload submission tools by the experiments and the knowledge gained from scale tests of the different proposed job submission strategies.

  19. A random-key encoded harmony search approach for energy-efficient production scheduling with shared resources

    NASA Astrophysics Data System (ADS)

    Garcia-Santiago, C. A.; Del Ser, J.; Upton, C.; Quilligan, F.; Gil-Lopez, S.; Salcedo-Sanz, S.

    2015-11-01

    When seeking near-optimal solutions for complex scheduling problems, meta-heuristics demonstrate good performance with affordable computational effort. This has resulted in a gravitation towards these approaches when researching industrial use-cases such as energy-efficient production planning. However, much of the previous research makes assumptions about softer constraints that affect planning strategies and about how human planners interact with the algorithm in a live production environment. This article describes a job-shop problem that focuses on minimizing energy consumption across a production facility of shared resources. The application scenario is based on real facilities made available by the Irish Center for Manufacturing Research. The formulated problem is tackled via harmony search heuristics with random keys encoding. Simulation results are compared to a genetic algorithm, a simulated annealing approach and a first-come-first-served scheduling. The superior performance obtained by the proposed scheduler paves the way towards its practical implementation over industrial production chains.

  20. An improved ant colony optimization algorithm with fault tolerance for job scheduling in grid computing systems

    PubMed Central

    Idris, Hajara; Junaidu, Sahalu B.; Adewumi, Aderemi O.

    2017-01-01

    The Grid scheduler, schedules user jobs on the best available resource in terms of resource characteristics by optimizing job execution time. Resource failure in Grid is no longer an exception but a regular occurring event as resources are increasingly being used by the scientific community to solve computationally intensive problems which typically run for days or even months. It is therefore absolutely essential that these long-running applications are able to tolerate failures and avoid re-computations from scratch after resource failure has occurred, to satisfy the user’s Quality of Service (QoS) requirement. Job Scheduling with Fault Tolerance in Grid Computing using Ant Colony Optimization is proposed to ensure that jobs are executed successfully even when resource failure has occurred. The technique employed in this paper, is the use of resource failure rate, as well as checkpoint-based roll back recovery strategy. Check-pointing aims at reducing the amount of work that is lost upon failure of the system by immediately saving the state of the system. A comparison of the proposed approach with an existing Ant Colony Optimization (ACO) algorithm is discussed. The experimental results of the implemented Fault Tolerance scheduling algorithm show that there is an improvement in the user’s QoS requirement over the existing ACO algorithm, which has no fault tolerance integrated in it. The performance evaluation of the two algorithms was measured in terms of the three main scheduling performance metrics: makespan, throughput and average turnaround time. PMID:28545075

  1. An ant colony optimization heuristic for an integrated production and distribution scheduling problem

    NASA Astrophysics Data System (ADS)

    Chang, Yung-Chia; Li, Vincent C.; Chiang, Chia-Ju

    2014-04-01

    Make-to-order or direct-order business models that require close interaction between production and distribution activities have been adopted by many enterprises in order to be competitive in demanding markets. This article considers an integrated production and distribution scheduling problem in which jobs are first processed by one of the unrelated parallel machines and then distributed to corresponding customers by capacitated vehicles without intermediate inventory. The objective is to find a joint production and distribution schedule so that the weighted sum of total weighted job delivery time and the total distribution cost is minimized. This article presents a mathematical model for describing the problem and designs an algorithm using ant colony optimization. Computational experiments illustrate that the algorithm developed is capable of generating near-optimal solutions. The computational results also demonstrate the value of integrating production and distribution in the model for the studied problem.

  2. Heuristic methods for the single machine scheduling problem with different ready times and a common due date

    NASA Astrophysics Data System (ADS)

    Birgin, Ernesto G.; Ronconi, Débora P.

    2012-10-01

    The single machine scheduling problem with a common due date and non-identical ready times for the jobs is examined in this work. Performance is measured by the minimization of the weighted sum of earliness and tardiness penalties of the jobs. Since this problem is NP-hard, the application of constructive heuristics that exploit specific characteristics of the problem to improve their performance is investigated. The proposed approaches are examined through a computational comparative study on a set of 280 benchmark test problems with up to 1000 jobs.

  3. Scheduling Jobs and a Variable Maintenance on a Single Machine with Common Due-Date Assignment

    PubMed Central

    Wan, Long

    2014-01-01

    We investigate a common due-date assignment scheduling problem with a variable maintenance on a single machine. The goal is to minimize the total earliness, tardiness, and due-date cost. We derive some properties on an optimal solution for our problem. For a special case with identical jobs we propose an optimal polynomial time algorithm followed by a numerical example. PMID:25147861

  4. Filling the Holes: Work Schedulers as Job Crafters of Employment Practice in Long-Term Health Care

    PubMed Central

    Kossek, Ellen Ernst; Piszczek, Matthew M.; Mcalpine, Kristie L.; Hammer, Leslie B.; Burke, Lisa

    2016-01-01

    Although work schedulers serve an organizational role influencing decisions about balancing conflicting stakeholder interests over schedules and staffing, scheduling has primarily been described as an objective activity or individual job characteristic. The authors use the lens of job crafting to examine how schedulers in 26 health care facilities enact their roles as they “fill holes” to schedule workers. Qualitative analysis of interview data suggests that schedulers expand their formal scope and influence to meet their interpretations of how to manage stakeholders (employers, workers, and patients). The authors analyze variations in the extent of job crafting (cognitive, physical, relational) to broaden role repertoires. They find evidence that some schedulers engage in rule-bound interpretation to avoid role expansion. They also identify four types of schedulers: enforcers, patient-focused schedulers, employee-focused schedulers, and balancers. The article adds to the job-crafting literature by showing that job crafting is conducted not only to create meaningful work but also to manage conflicting demands and to mediate among the competing labor interests of workers, clients, and employers. PMID:27721517

  5. Scheduling with genetic algorithms

    NASA Technical Reports Server (NTRS)

    Fennel, Theron R.; Underbrink, A. J., Jr.; Williams, George P. W., Jr.

    1994-01-01

    In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

  6. Work schedule manager gap analysis : assessing the future training needs of work schedule managers using a strategic job analysis approach.

    DOT National Transportation Integrated Search

    2010-05-01

    This report documents the results of a strategic job analysis that examined the job tasks and knowledge, skills, abilities, and other characteristics (KSAOs) needed to perform the job of a work schedule manager. The strategic job analysis compared in...

  7. Work schedule manager gap analysis : assessing the future training needs of work schedule managers using a strategic job analysis approach

    DOT National Transportation Integrated Search

    2010-05-01

    This report documents the results of a strategic job analysis that examined the job tasks and knowledge, skills, abilities, and other characteristics (KSAOs) needed to perform the job of a work schedule manager. The strategic job analysis compared in...

  8. Solving a supply chain scheduling problem with non-identical job sizes and release times by applying a novel effective heuristic algorithm

    NASA Astrophysics Data System (ADS)

    Pei, Jun; Liu, Xinbao; Pardalos, Panos M.; Fan, Wenjuan; Wang, Ling; Yang, Shanlin

    2016-03-01

    Motivated by applications in manufacturing industry, we consider a supply chain scheduling problem, where each job is characterised by non-identical sizes, different release times and unequal processing times. The objective is to minimise the makespan by making batching and sequencing decisions. The problem is formalised as a mixed integer programming model and proved to be strongly NP-hard. Some structural properties are presented for both the general case and a special case. Based on these properties, a lower bound is derived, and a novel two-phase heuristic (TP-H) is developed to solve the problem, which guarantees to obtain a worst case performance ratio of ?. Computational experiments with a set of different sizes of random instances are conducted to evaluate the proposed approach TP-H, which is superior to another two heuristics proposed in the literature. Furthermore, the experimental results indicate that TP-H can effectively and efficiently solve large-size problems in a reasonable time.

  9. MIP models and hybrid algorithms for simultaneous job splitting and scheduling on unrelated parallel machines.

    PubMed

    Eroglu, Duygu Yilmaz; Ozmutlu, H Cenk

    2014-01-01

    We developed mixed integer programming (MIP) models and hybrid genetic-local search algorithms for the scheduling problem of unrelated parallel machines with job sequence and machine-dependent setup times and with job splitting property. The first contribution of this paper is to introduce novel algorithms which make splitting and scheduling simultaneously with variable number of subjobs. We proposed simple chromosome structure which is constituted by random key numbers in hybrid genetic-local search algorithm (GAspLA). Random key numbers are used frequently in genetic algorithms, but it creates additional difficulty when hybrid factors in local search are implemented. We developed algorithms that satisfy the adaptation of results of local search into the genetic algorithms with minimum relocation operation of genes' random key numbers. This is the second contribution of the paper. The third contribution of this paper is three developed new MIP models which are making splitting and scheduling simultaneously. The fourth contribution of this paper is implementation of the GAspLAMIP. This implementation let us verify the optimality of GAspLA for the studied combinations. The proposed methods are tested on a set of problems taken from the literature and the results validate the effectiveness of the proposed algorithms.

  10. MIP Models and Hybrid Algorithms for Simultaneous Job Splitting and Scheduling on Unrelated Parallel Machines

    PubMed Central

    Ozmutlu, H. Cenk

    2014-01-01

    We developed mixed integer programming (MIP) models and hybrid genetic-local search algorithms for the scheduling problem of unrelated parallel machines with job sequence and machine-dependent setup times and with job splitting property. The first contribution of this paper is to introduce novel algorithms which make splitting and scheduling simultaneously with variable number of subjobs. We proposed simple chromosome structure which is constituted by random key numbers in hybrid genetic-local search algorithm (GAspLA). Random key numbers are used frequently in genetic algorithms, but it creates additional difficulty when hybrid factors in local search are implemented. We developed algorithms that satisfy the adaptation of results of local search into the genetic algorithms with minimum relocation operation of genes' random key numbers. This is the second contribution of the paper. The third contribution of this paper is three developed new MIP models which are making splitting and scheduling simultaneously. The fourth contribution of this paper is implementation of the GAspLAMIP. This implementation let us verify the optimality of GAspLA for the studied combinations. The proposed methods are tested on a set of problems taken from the literature and the results validate the effectiveness of the proposed algorithms. PMID:24977204

  11. Multi-objective problem of the modified distributed parallel machine and assembly scheduling problem (MDPMASP) with eligibility constraints

    NASA Astrophysics Data System (ADS)

    Amallynda, I.; Santosa, B.

    2017-11-01

    This paper proposes a new generalization of the distributed parallel machine and assembly scheduling problem (DPMASP) with eligibility constraints referred to as the modified distributed parallel machine and assembly scheduling problem (MDPMASP) with eligibility constraints. Within this generalization, we assume that there are a set non-identical factories or production lines, each one with a set unrelated parallel machine with different speeds in processing them disposed to a single assembly machine in series. A set of different products that are manufactured through an assembly program of a set of components (jobs) according to the requested demand. Each product requires several kinds of jobs with different sizes. Beside that we also consider to the multi-objective problem (MOP) of minimizing mean flow time and the number of tardy products simultaneously. This is known to be NP-Hard problem, is important to practice, as the former criterions to reflect the customer's demand and manufacturer's perspective. This is a realistic and complex problem with wide range of possible solutions, we propose four simple heuristics and two metaheuristics to solve it. Various parameters of the proposed metaheuristic algorithms are discussed and calibrated by means of Taguchi technique. All proposed algorithms are tested by Matlab software. Our computational experiments indicate that the proposed problem and fourth proposed algorithms are able to be implemented and can be used to solve moderately-sized instances, and giving efficient solutions, which are close to optimum in most cases.

  12. NAS Requirements Checklist for Job Queuing/Scheduling Software

    NASA Technical Reports Server (NTRS)

    Jones, James Patton

    1996-01-01

    The increasing reliability of parallel systems and clusters of computers has resulted in these systems becoming more attractive for true production workloads. Today, the primary obstacle to production use of clusters of computers is the lack of a functional and robust Job Management System for parallel applications. This document provides a checklist of NAS requirements for job queuing and scheduling in order to make most efficient use of parallel systems and clusters for parallel applications. Future requirements are also identified to assist software vendors with design planning.

  13. A new parallel DNA algorithm to solve the task scheduling problem based on inspired computational model.

    PubMed

    Wang, Zhaocai; Ji, Zuwen; Wang, Xiaoming; Wu, Tunhua; Huang, Wei

    2017-12-01

    As a promising approach to solve the computationally intractable problem, the method based on DNA computing is an emerging research area including mathematics, computer science and molecular biology. The task scheduling problem, as a well-known NP-complete problem, arranges n jobs to m individuals and finds the minimum execution time of last finished individual. In this paper, we use a biologically inspired computational model and describe a new parallel algorithm to solve the task scheduling problem by basic DNA molecular operations. In turn, we skillfully design flexible length DNA strands to represent elements of the allocation matrix, take appropriate biological experiment operations and get solutions of the task scheduling problem in proper length range with less than O(n 2 ) time complexity. Copyright © 2017. Published by Elsevier B.V.

  14. Comparison of OPC job prioritization schemes to generate data for mask manufacturing

    NASA Astrophysics Data System (ADS)

    Lewis, Travis; Veeraraghavan, Vijay; Jantzen, Kenneth; Kim, Stephen; Park, Minyoung; Russell, Gordon; Simmons, Mark

    2015-03-01

    Delivering mask ready OPC corrected data to the mask shop on-time is critical for a foundry to meet the cycle time commitment for a new product. With current OPC compute resource sharing technology, different job scheduling algorithms are possible, such as, priority based resource allocation and fair share resource allocation. In order to maximize computer cluster efficiency, minimize the cost of the data processing and deliver data on schedule, the trade-offs of each scheduling algorithm need to be understood. Using actual production jobs, each of the scheduling algorithms will be tested in a production tape-out environment. Each scheduling algorithm will be judged on its ability to deliver data on schedule and the trade-offs associated with each method will be analyzed. It is now possible to introduce advance scheduling algorithms to the OPC data processing environment to meet the goals of on-time delivery of mask ready OPC data while maximizing efficiency and reducing cost.

  15. Benchmark Production Scheduling Problems for Job Shops with Interactive Constraints

    DTIC Science & Technology

    1993-09-01

    Goldratt has stated that cost accounting is the number one enemy of productivity (Goldratt and Cox, 1992). Why does he believe this? Cost accounting ...28). This incorrect emphasis can lead managers to make improper decisions. For example, traditional analysis based on cost accounting may lead to...measures (Goldratt and Fox, 1986:28). Global Operational Measures As opposed to measuring each individual process station against cost accounting

  16. Job Scheduling with Efficient Resource Monitoring in Cloud Datacenter

    PubMed Central

    Loganathan, Shyamala; Mukherjee, Saswati

    2015-01-01

    Cloud computing is an on-demand computing model, which uses virtualization technology to provide cloud resources to users in the form of virtual machines through internet. Being an adaptable technology, cloud computing is an excellent alternative for organizations for forming their own private cloud. Since the resources are limited in these private clouds maximizing the utilization of resources and giving the guaranteed service for the user are the ultimate goal. For that, efficient scheduling is needed. This research reports on an efficient data structure for resource management and resource scheduling technique in a private cloud environment and discusses a cloud model. The proposed scheduling algorithm considers the types of jobs and the resource availability in its scheduling decision. Finally, we conducted simulations using CloudSim and compared our algorithm with other existing methods, like V-MCT and priority scheduling algorithms. PMID:26473166

  17. Job Scheduling with Efficient Resource Monitoring in Cloud Datacenter.

    PubMed

    Loganathan, Shyamala; Mukherjee, Saswati

    2015-01-01

    Cloud computing is an on-demand computing model, which uses virtualization technology to provide cloud resources to users in the form of virtual machines through internet. Being an adaptable technology, cloud computing is an excellent alternative for organizations for forming their own private cloud. Since the resources are limited in these private clouds maximizing the utilization of resources and giving the guaranteed service for the user are the ultimate goal. For that, efficient scheduling is needed. This research reports on an efficient data structure for resource management and resource scheduling technique in a private cloud environment and discusses a cloud model. The proposed scheduling algorithm considers the types of jobs and the resource availability in its scheduling decision. Finally, we conducted simulations using CloudSim and compared our algorithm with other existing methods, like V-MCT and priority scheduling algorithms.

  18. A methodological proposal for the development of an HPC-based antenna array scheduler

    NASA Astrophysics Data System (ADS)

    Bonvallet, Roberto; Hoffstadt, Arturo; Herrera, Diego; López, Daniela; Gregorio, Rodrigo; Almuna, Manuel; Hiriart, Rafael; Solar, Mauricio

    2010-07-01

    As new astronomy projects choose interferometry to improve angular resolution and to minimize costs, preparing and optimizing schedules for an antenna array becomes an increasingly critical task. This problem shares similarities with the job-shop problem, which is known to be a NP-hard problem, making a complete approach infeasible. In the case of ALMA, 18000 projects per season are expected, and the best schedule must be found in the order of minutes. The problem imposes severe difficulties: the large domain of observation projects to be taken into account; a complex objective function, composed of several abstract, environmental, and hardware constraints; the number of restrictions imposed and the dynamic nature of the problem, as weather is an ever-changing variable. A solution can benefit from the use of High-Performance Computing for the final implementation to be deployed, but also for the development process. Our research group proposes the use of both metaheuristic search and statistical learning algorithms, in order to create schedules in a reasonable time. How these techniques will be applied is yet to be determined as part of the ongoing research. Several algorithms need to be implemented, tested and evaluated by the team. This work presents the methodology proposed to lead the development of the scheduler. The basic functionality is encapsulated into software components implemented on parallel architectures. These components expose a domain-level interface to the researchers, enabling then to develop early prototypes for evaluating and comparing their proposed techniques.

  19. Do job demands and job control affect problem-solving?

    PubMed

    Bergman, Peter N; Ahlberg, Gunnel; Johansson, Gun; Stoetzer, Ulrich; Aborg, Carl; Hallsten, Lennart; Lundberg, Ingvar

    2012-01-01

    The Job Demand Control model presents combinations of working conditions that may facilitate learning, the active learning hypothesis, or have detrimental effects on health, the strain hypothesis. To test the active learning hypothesis, this study analysed the effects of job demands and job control on general problem-solving strategies. A population-based sample of 4,636 individuals (55% women, 45% men) with the same job characteristics measured at two times with a three year time lag was used. Main effects of demands, skill discretion, task authority and control, and the combined effects of demands and control were analysed in logistic regressions, on four outcomes representing general problem-solving strategies. Those reporting high on skill discretion, task authority and control, as well as those reporting high demand/high control and low demand/high control job characteristics were more likely to state using problem solving strategies. Results suggest that working conditions including high levels of control may affect how individuals cope with problems and that workplace characteristics may affect behaviour in the non-work domain.

  20. Binary Trees and Parallel Scheduling Algorithms.

    DTIC Science & Technology

    1980-09-01

    been pro- cessed for p. time units. If a job does not complete by its due time, it is tardy. In a nonpreemptive schedule, job i is scheduled to process...the preemptive schedule obtained by the algorithm of section 2.1.2 also minimizes 5Ti, this problem is easily solved in parallel. When lci is to e...August 1978, pp. 657-661. 14. Horn, W. A., "Some simple scheduling algorithms," Naval Res. Logist . Qur., Vol. 21, pp. 177-185, 1974. i5. Hforowitz, E

  1. Space communications scheduler: A rule-based approach to adaptive deadline scheduling

    NASA Technical Reports Server (NTRS)

    Straguzzi, Nicholas

    1990-01-01

    Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

  2. Focus of attention in an activity-based scheduler

    NASA Technical Reports Server (NTRS)

    Sadeh, Norman; Fox, Mark S.

    1989-01-01

    Earlier research in job shop scheduling has demonstrated the advantages of opportunistically combining order-based and resource-based scheduling techniques. An even more flexible approach is investigated where each activity is considered a decision point by itself. Heuristics to opportunistically select the next decision point on which to focus attention (i.e., variable ordering heuristics) and the next decision to be tried at this point (i.e., value ordering heuristics) are described that probabilistically account for both activity precedence and resource requirement interactions. Preliminary experimental results indicate that the variable ordering heuristic greatly increases search efficiency. While least constraining value ordering heuristics have been advocated in the literature, the experimental results suggest that other value ordering heuristics combined with our variable-ordering heuristic can produce much better schedules without significantly increasing search.

  3. Evaluation of Job Queuing/Scheduling Software: Phase I Report

    NASA Technical Reports Server (NTRS)

    Jones, James Patton

    1996-01-01

    The recent proliferation of high performance work stations and the increased reliability of parallel systems have illustrated the need for robust job management systems to support parallel applications. To address this issue, the national Aerodynamic Simulation (NAS) supercomputer facility compiled a requirements checklist for job queuing/scheduling software. Next, NAS began an evaluation of the leading job management system (JMS) software packages against the checklist. This report describes the three-phase evaluation process, and presents the results of Phase 1: Capabilities versus Requirements. We show that JMS support for running parallel applications on clusters of workstations and parallel systems is still insufficient, even in the leading JMS's. However, by ranking each JMS evaluated against the requirements, we provide data that will be useful to other sites in selecting a JMS.

  4. Scheduling Real-Time Mixed-Criticality Jobs

    NASA Astrophysics Data System (ADS)

    Baruah, Sanjoy K.; Bonifaci, Vincenzo; D'Angelo, Gianlorenzo; Li, Haohan; Marchetti-Spaccamela, Alberto; Megow, Nicole; Stougie, Leen

    Many safety-critical embedded systems are subject to certification requirements; some systems may be required to meet multiple sets of certification requirements, from different certification authorities. Certification requirements in such "mixed-criticality" systems give rise to interesting scheduling problems, that cannot be satisfactorily addressed using techniques from conventional scheduling theory. In this paper, we study a formal model for representing such mixed-criticality workloads. We demonstrate first the intractability of determining whether a system specified in this model can be scheduled to meet all its certification requirements, even for systems subject to two sets of certification requirements. Then we quantify, via the metric of processor speedup factor, the effectiveness of two techniques, reservation-based scheduling and priority-based scheduling, that are widely used in scheduling such mixed-criticality systems, showing that the latter of the two is superior to the former. We also show that the speedup factors are tight for these two techniques.

  5. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R [Livermore, CA; Eckert, Philip D [Livermore, CA; Hommes, Gregg [Pleasanton, CA

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  6. Envisioning Competence: Learning, Problem Solving, and Children at Work in the Exploratory Bicycle Shop

    ERIC Educational Resources Information Center

    Hammond, Charles Florian

    2010-01-01

    This study examines the conceptual learning and cognitive development processes of schoolchildren engaged in problem solving activities in a non-school, workplace setting known as the exploratory bicycle shop. The exploratory bike shop is a commercial bicycle shop: a) that has been adapted for combined retail and educational purposes and b) where…

  7. Handbook for Trade and Industrial Shop Teachers.

    ERIC Educational Resources Information Center

    Texas A and M Univ., College Station. Vocational Instructional Services.

    This handbook is intended to help teachers of pre-employment shop courses in organizing and delivering instruction in both the shop and classroom. Addressed in the guide are the following topics: the instructor's place in the local school organization; the instructor's job (objectives, advisory committees, occupational analysis, shop/classroom and…

  8. Hybrid Pareto artificial bee colony algorithm for multi-objective single machine group scheduling problem with sequence-dependent setup times and learning effects.

    PubMed

    Yue, Lei; Guan, Zailin; Saif, Ullah; Zhang, Fei; Wang, Hao

    2016-01-01

    Group scheduling is significant for efficient and cost effective production system. However, there exist setup times between the groups, which require to decrease it by sequencing groups in an efficient way. Current research is focused on a sequence dependent group scheduling problem with an aim to minimize the makespan in addition to minimize the total weighted tardiness simultaneously. In most of the production scheduling problems, the processing time of jobs is assumed as fixed. However, the actual processing time of jobs may be reduced due to "learning effect". The integration of sequence dependent group scheduling problem with learning effects has been rarely considered in literature. Therefore, current research considers a single machine group scheduling problem with sequence dependent setup times and learning effects simultaneously. A novel hybrid Pareto artificial bee colony algorithm (HPABC) with some steps of genetic algorithm is proposed for current problem to get Pareto solutions. Furthermore, five different sizes of test problems (small, small medium, medium, large medium, large) are tested using proposed HPABC. Taguchi method is used to tune the effective parameters of the proposed HPABC for each problem category. The performance of HPABC is compared with three famous multi objective optimization algorithms, improved strength Pareto evolutionary algorithm (SPEA2), non-dominated sorting genetic algorithm II (NSGAII) and particle swarm optimization algorithm (PSO). Results indicate that HPABC outperforms SPEA2, NSGAII and PSO and gives better Pareto optimal solutions in terms of diversity and quality for almost all the instances of the different sizes of problems.

  9. Enhanced Specification and Verification for Timed Planning

    DTIC Science & Technology

    2009-02-28

    Scheduling Problem The job-shop scheduling problem ( JSSP ) is a generic resource allocation problem in which common resources (“machines”) are required...interleaving of all processes Pi with the non-delay and mutual exclusion constraints: JSSP =̂ |||0<i6n Pi Where mutual-exclusion( JSSP ) For every complete...execution of JSSP (which terminates), its associated sched- ule S is a feasible schedule. An optimal schedule is a trace of JSSP with the minimum ending

  10. Hybrid Metaheuristics for Solving a Fuzzy Single Batch-Processing Machine Scheduling Problem

    PubMed Central

    Molla-Alizadeh-Zavardehi, S.; Tavakkoli-Moghaddam, R.; Lotfi, F. Hosseinzadeh

    2014-01-01

    This paper deals with a problem of minimizing total weighted tardiness of jobs in a real-world single batch-processing machine (SBPM) scheduling in the presence of fuzzy due date. In this paper, first a fuzzy mixed integer linear programming model is developed. Then, due to the complexity of the problem, which is NP-hard, we design two hybrid metaheuristics called GA-VNS and VNS-SA applying the advantages of genetic algorithm (GA), variable neighborhood search (VNS), and simulated annealing (SA) frameworks. Besides, we propose three fuzzy earliest due date heuristics to solve the given problem. Through computational experiments with several random test problems, a robust calibration is applied on the parameters. Finally, computational results on different-scale test problems are presented to compare the proposed algorithms. PMID:24883359

  11. AI techniques for a space application scheduling problem

    NASA Technical Reports Server (NTRS)

    Thalman, N.; Sparn, T.; Jaffres, L.; Gablehouse, D.; Judd, D.; Russell, C.

    1991-01-01

    Scheduling is a very complex optimization problem which can be categorized as an NP-complete problem. NP-complete problems are quite diverse, as are the algorithms used in searching for an optimal solution. In most cases, the best solutions that can be derived for these combinatorial explosive problems are near-optimal solutions. Due to the complexity of the scheduling problem, artificial intelligence (AI) can aid in solving these types of problems. Some of the factors are examined which make space application scheduling problems difficult and presents a fairly new AI-based technique called tabu search as applied to a real scheduling application. the specific problem is concerned with scheduling application. The specific problem is concerned with scheduling solar and stellar observations for the SOLar-STellar Irradiance Comparison Experiment (SOLSTICE) instrument in a constrained environment which produces minimum impact on the other instruments and maximizes target observation times. The SOLSTICE instrument will gly on-board the Upper Atmosphere Research Satellite (UARS) in 1991, and a similar instrument will fly on the earth observing system (Eos).

  12. Environment-Aware Production Schedulingfor Paint Shops in Automobile Manufacturing: A Multi-Objective Optimization Approach.

    PubMed

    Zhang, Rui

    2017-12-25

    The traditional way of scheduling production processes often focuses on profit-driven goals (such as cycle time or material cost) while tending to overlook the negative impacts of manufacturing activities on the environment in the form of carbon emissions and other undesirable by-products. To bridge the gap, this paper investigates an environment-aware production scheduling problem that arises from a typical paint shop in the automobile manufacturing industry. In the studied problem, an objective function is defined to minimize the emission of chemical pollutants caused by the cleaning of painting devices which must be performed each time before a color change occurs. Meanwhile, minimization of due date violations in the downstream assembly shop is also considered because the two shops are interrelated and connected by a limited-capacity buffer. First, we have developed a mixed-integer programming formulation to describe this bi-objective optimization problem. Then, to solve problems of practical size, we have proposed a novel multi-objective particle swarm optimization (MOPSO) algorithm characterized by problem-specific improvement strategies. A branch-and-bound algorithm is designed for accurately assessing the most promising solutions. Finally, extensive computational experiments have shown that the proposed MOPSO is able to match the solution quality of an exact solver on small instances and outperform two state-of-the-art multi-objective optimizers in literature on large instances with up to 200 cars.

  13. Second Evaluation of Job Queuing/Scheduling Software. Phase 1

    NASA Technical Reports Server (NTRS)

    Jones, James Patton; Brickell, Cristy; Chancellor, Marisa (Technical Monitor)

    1997-01-01

    The recent proliferation of high performance workstations and the increased reliability of parallel systems have illustrated the need for robust job management systems to support parallel applications. To address this issue, NAS compiled a requirements checklist for job queuing/scheduling software. Next, NAS evaluated the leading job management system (JMS) software packages against the checklist. A year has now elapsed since the first comparison was published, and NAS has repeated the evaluation. This report describes this second evaluation, and presents the results of Phase 1: Capabilities versus Requirements. We show that JMS support for running parallel applications on clusters of workstations and parallel systems is still lacking, however, definite progress has been made by the vendors to correct the deficiencies. This report is supplemented by a WWW interface to the data collected, to aid other sites in extracting the evaluation information on specific requirements of interest.

  14. AWAS: A dynamic work scheduling system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Y.; Hao, J.; Kocur, G.

    1994-12-31

    The Automated Work Administration System (AWAS) is an automated scheduling system developed at GTE. A typical work center has 1000 employees and processes 4000 jobs each day. Jobs are geographically distributed within the service area of the work center, require different skills, and have to be done within specified time windows. Each job can take anywhere from 12 minutes to several hours to complete. Each employee can have his/her individual schedule, skill, or working area. The jobs can enter and leave the system at any time The employees dial up to the system to request for their next job atmore » the beginning of a day or after a job is done. The system is able to respond to the changes dynamically and produce close to optimum solutions at real time. We formulate the real world problem as a minimum cost network flow problem. Both employees and jobs are formulated as nodes. Relationship between jobs and employees are formulated as arcs, and working hours contributed by employees and consumed by jobs are formulated as flow. The goal is to minimize missed commitments. We solve the problem with the successive shortest path algorithm. Combined with pre-processing and post-processing, the system produces reasonable outputs and the response time is very good.« less

  15. A best on-line algorithm for single machine scheduling the equal length jobs with the special chain precedence and delivery time

    NASA Astrophysics Data System (ADS)

    Gu, Cunchang; Mu, Yundong

    2013-03-01

    In this paper, we consider a single machine on-line scheduling problem with the special chains precedence and delivery time. All jobs arrive over time. The chains chainsi arrive at time ri , it is known that the processing and delivery time of each job on the chain satisfy one special condition CD a forehand: if the job J(i)j is the predecessor of the job J(i)k on the chain chaini, then they satisfy p(i)j = p(i)k = p >= qj >= qk , i = 1,2, ---,n , where pj and qj denote the processing time and the delivery time of the job Jj respectively. Obviously, if the arrival jobs have no chains precedence, it shows that the length of the corresponding chain is 1. The objective is to minimize the time by which all jobs have been delivered. We provide an on-line algorithm with a competitive ratio of √2 , and the result is the best possible.

  16. Design of an automatic production monitoring system on job shop manufacturing

    NASA Astrophysics Data System (ADS)

    Prasetyo, Hoedi; Sugiarto, Yohanes; Rosyidi, Cucuk Nur

    2018-02-01

    Every production process requires monitoring system, so the desired efficiency and productivity can be monitored at any time. This system is also needed in the job shop type of manufacturing which is mainly influenced by the manufacturing lead time. Processing time is one of the factors that affect the manufacturing lead time. In a conventional company, the recording of processing time is done manually by the operator on a sheet of paper. This method is prone to errors. This paper aims to overcome this problem by creating a system which is able to record and monitor the processing time automatically. The solution is realized by utilizing electric current sensor, barcode, RFID, wireless network and windows-based application. An automatic monitoring device is attached to the production machine. It is equipped with a touch screen-LCD so that the operator can use it easily. Operator identity is recorded through RFID which is embedded in his ID card. The workpiece data are collected from the database by scanning the barcode listed on its monitoring sheet. A sensor is mounted on the machine to measure the actual machining time. The system's outputs are actual processing time and machine's capacity information. This system is connected wirelessly to a workshop planning application belongs to the firm. Test results indicated that all functions of the system can run properly. This system successfully enables supervisors, PPIC or higher level management staffs to monitor the processing time quickly with a better accuracy.

  17. The Science Shop for Physics: an interface between practical problems in society and physical knowledge

    NASA Astrophysics Data System (ADS)

    van den Berg, G. P.

    1998-03-01

    Since some 20 years most Dutch universities have one or more science shops. Central shops handle research questions for all disciplines. Specialized shops are part of a department of chemistry or medicine, history, social science, etc. The shops have evolved rather differently, but their main mission still is to help social groups that lack money and have no easy access to scientific knowledge, e.g. neighbourhood, environmental, third world or patient groups. Most also help non-commercial organizations such as schools, trade unions or local authorities. Low-cost help can be provided because students do the work as part of their training, mainly in student projects (literature search, practical work, graduation, etc.). A total staff of 80, helped by 600 students, 250 voluntary and 50 paid researchers, handle 1500 questions resulting in 300 reports (estimated figures 1995). Science shops for physics (`Physics Shop', PS) have to deal with practical problems, generally involving classical physics. Major topics are noise, vibration, radiation, indoor climate and energy: most of the work lies in estimating/measuring relevant parameters, assessing impact, seeking solutions. The 3 Dutch PS's have developed in different directions. One is run entirely by students and deals with small, concrete problems. The second PS is managed by a co-ordinator who mediates between client groups and physics staff members who assist students in small and larger projects. The third has a lot of in-house expertise, and the shop staff is in direct contact with client groups as well as students who work in the PS itself. In questions submitted to the PS it is not always immediately clear what to do or how to do it because of the non-scientific phrasing of the problems and problems include non-physical (e.g. technical, health or legal) aspects. Also, difficulties in solving the problems are typically not in the underlying physics, but in the lack of accurate data and of control of the complex

  18. More reliable protein NMR peak assignment via improved 2-interval scheduling.

    PubMed

    Chen, Zhi-Zhong; Lin, Guohui; Rizzi, Romeo; Wen, Jianjun; Xu, Dong; Xu, Ying; Jiang, Tao

    2005-03-01

    Protein NMR peak assignment refers to the process of assigning a group of "spin systems" obtained experimentally to a protein sequence of amino acids. The automation of this process is still an unsolved and challenging problem in NMR protein structure determination. Recently, protein NMR peak assignment has been formulated as an interval scheduling problem (ISP), where a protein sequence P of amino acids is viewed as a discrete time interval I (the amino acids on P one-to-one correspond to the time units of I), each subset S of spin systems that are known to originate from consecutive amino acids from P is viewed as a "job" j(s), the preference of assigning S to a subsequence P of consecutive amino acids on P is viewed as the profit of executing job j(s) in the subinterval of I corresponding to P, and the goal is to maximize the total profit of executing the jobs (on a single machine) during I. The interval scheduling problem is max SNP-hard in general; but in the real practice of protein NMR peak assignment, each job j(s) usually requires at most 10 consecutive time units, and typically the jobs that require one or two consecutive time units are the most difficult to assign/schedule. In order to solve these most difficult assignments, we present an efficient 13/7-approximation algorithm for the special case of the interval scheduling problem where each job takes one or two consecutive time units. Combining this algorithm with a greedy filtering strategy for handling long jobs (i.e., jobs that need more than two consecutive time units), we obtain a new efficient heuristic for protein NMR peak assignment. Our experimental study shows that the new heuristic produces the best peak assignment in most of the cases, compared with the NMR peak assignment algorithms in the recent literature. The above algorithm is also the first approximation algorithm for a nontrivial case of the well-known interval scheduling problem that breaks the ratio 2 barrier.

  19. Machine Shop. Instructor Key. Supplementary Units.

    ERIC Educational Resources Information Center

    Walden, Charles; Cole, Phyllis

    These supplementary units are designed to help students with special needs learn and apply machine shop skills. Nine competencies that are difficult for special needs students to grasp or that would help them get a future job in the field were chosen from the regular machine shop curriculum. Specific objectives for these competencies are listed at…

  20. Development of a job rotation scheduling algorithm for minimizing accumulated work load per body parts.

    PubMed

    Song, JooBong; Lee, Chaiwoo; Lee, WonJung; Bahn, Sangwoo; Jung, ChanJu; Yun, Myung Hwan

    2015-01-01

    For the successful implementation of job rotation, jobs should be scheduled systematically so that physical workload is evenly distributed with the use of various body parts. However, while the potential benefits are widely recognized by research and industry, there is still a need for a more effective and efficient algorithm that considers multiple work-related factors in job rotation scheduling. This study suggests a type of job rotation algorithm that aims to minimize musculoskeletal disorders with the approach of decreasing the overall workload. Multiple work characteristics are evaluated as inputs to the proposed algorithm. Important factors, such as physical workload on specific body parts, working height, involvement of heavy lifting, and worker characteristics such as physical disorders, are included in the algorithm. For evaluation of the overall workload in a given workplace, an objective function was defined to aggregate the scores from the individual factors. A case study, where the algorithm was applied at a workplace, is presented with an examination on its applicability and effectiveness. With the application of the suggested algorithm in case study, the value of the final objective function, which is the weighted sum of the workload in various body parts, decreased by 71.7% when compared to a typical sequential assignment and by 84.9% when compared to a single job assignment, which is doing one job all day. An algorithm was developed using the data from the ergonomic evaluation tool used in the plant and from the known factors related to workload. The algorithm was developed so that it can be efficiently applied with a small amount of required inputs, while covering a wide range of work-related factors. A case study showed that the algorithm was beneficial in determining a job rotation schedule aimed at minimizing workload across body parts.

  1. Comparison of job stress and obesity in nurses with favorable and unfavorable work schedules.

    PubMed

    Han, Kihye; Trinkoff, Alison M; Storr, Carla L; Geiger-Brown, Jeanne; Johnson, Karen L; Park, Sungae

    2012-08-01

    To compare obesity-related factors between female nurses with favorable work schedules (WSs) and unfavorable WSs. In a cross-sectional study, 1724 female nurses were stratified by WS (favorable vs unfavorable). For each schedule type, the odds of obesity were related to health behaviors, home demands, and job stress using logistic regression models. Among nurses with unfavorable WSs, healthy behaviors (exercise, sleep) were inversely associated with obesity, whereas for those with favorable WSs, obese nurses reported significantly more unhealthy behaviors (smoking, alcohol use; odds ratio [OR], 1.19; 95% confidence interval [CI], 1.02-1.38), more physical lifting of children/dependents (OR, 1.43; 95% CI, 1.06-1.93), having more nurse input into their jobs (OR, 1.21; 95% CI, 1.02-1.44), yet less boss support at work (OR, 0.83; 95% CI, 0.68-0.99). Considering impacts of WSs on obesity and potential obesity-related health outcomes, healthful scheduling should be provided to nurses.

  2. Single machine scheduling with slack due dates assignment

    NASA Astrophysics Data System (ADS)

    Liu, Weiguo; Hu, Xiangpei; Wang, Xuyin

    2017-04-01

    This paper considers a single machine scheduling problem in which each job is assigned an individual due date based on a common flow allowance (i.e. all jobs have slack due date). The goal is to find a sequence for jobs, together with a due date assignment, that minimizes a non-regular criterion comprising the total weighted absolute lateness value and common flow allowance cost, where the weight is a position-dependent weight. In order to solve this problem, an ? time algorithm is proposed. Some extensions of the problem are also shown.

  3. Job Satisfaction, Job Reward Characteristics, and Employees' Problem Drinking Behaviors.

    ERIC Educational Resources Information Center

    Martin, Jack K.; Roman, Paul M.

    1996-01-01

    Data from the National Employee Survey revealed a complex interplay of job stress, rewards, and job satisfaction influencing employees' problem drinking behavior. Satisfied workers were significantly less likely to abuse alcohol. Support was found for the spillover model indicating that work has important effects on behavior in nonwork settings.…

  4. Aerial Refueling Process Rescheduling Under Job Related Disruptions

    NASA Technical Reports Server (NTRS)

    Kaplan, Sezgin; Rabadi, Ghaith

    2011-01-01

    The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on the multiple tankers (machines) to minimize the total weighted tardiness. ARSP assumes that the jobs have different release times and due dates. The ARSP is dynamic environment and unexpected events may occur. In this paper, rescheduling in the aerial refueling process with a time set of jobs will be studied to deal with job related disruptions such as the arrival of new jobs, the departure of an existing job, high deviations in the release times and changes in job priorities. In order to keep the stability and to avoid excessive computation, partial schedule repair algorithm is developed and its preliminary results are presented.

  5. Collectives for Multiple Resource Job Scheduling Across Heterogeneous Servers

    NASA Technical Reports Server (NTRS)

    Tumer, K.; Lawson, J.

    2003-01-01

    Efficient management of large-scale, distributed data storage and processing systems is a major challenge for many computational applications. Many of these systems are characterized by multi-resource tasks processed across a heterogeneous network. Conventional approaches, such as load balancing, work well for centralized, single resource problems, but breakdown in the more general case. In addition, most approaches are often based on heuristics which do not directly attempt to optimize the world utility. In this paper, we propose an agent based control system using the theory of collectives. We configure the servers of our network with agents who make local job scheduling decisions. These decisions are based on local goals which are constructed to be aligned with the objective of optimizing the overall efficiency of the system. We demonstrate that multi-agent systems in which all the agents attempt to optimize the same global utility function (team game) only marginally outperform conventional load balancing. On the other hand, agents configured using collectives outperform both team games and load balancing (by up to four times for the latter), despite their distributed nature and their limited access to information.

  6. Future Shop: A Model Career Placement & Transition Laboratory.

    ERIC Educational Resources Information Center

    Floyd, Deborah L.; And Others

    During 1988-89, the Collin County Community College District (CCCCD) conducted a project to develop, implement, and evaluate a model career laboratory called a "Future Shop." The laboratory was designed to let users explore diverse career options, job placement opportunities, and transfer resources. The Future Shop lab had three major components:…

  7. Shopping Parents: Patient Problem or Professional Problem?

    ERIC Educational Resources Information Center

    Keirn, William C.

    1971-01-01

    A survey of parents of retarded children showed less than 3 per cent of the parents were shopping parents, defined as those who pursue a third professional evaluation after receiving at least two others on previous occasions. (KW)

  8. Job Sharing: An Employment Alternative for the Career Services Professional.

    ERIC Educational Resources Information Center

    Johnson, Louise; Meerdink, Lois A.

    1985-01-01

    Describes and assesses job sharing as an employment alternative for career services professionals. Discusses the job-sharing format with regard to fringe benefits, scheduling, advantages, client reactions, potential problems, and specific factors that contribute to successful job sharing. (BH)

  9. Artificial intelligence for the CTA Observatory scheduler

    NASA Astrophysics Data System (ADS)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  10. Applying mathematical modeling to create job rotation schedules for minimizing occupational noise exposure.

    PubMed

    Tharmmaphornphilas, Wipawee; Green, Benjamin; Carnahan, Brian J; Norman, Bryan A

    2003-01-01

    This research developed worker schedules by using administrative controls and a computer programming model to reduce the likelihood of worker hearing loss. By rotating the workers through different jobs during the day it was possible to reduce their exposure to hazardous noise levels. Computer simulations were made based on data collected in a real setting. Worker schedules currently used at the site are compared with proposed worker schedules from the computer simulations. For the worker assignment plans found by the computer model, the authors calculate a significant decrease in time-weighted average (TWA) sound level exposure. The maximum daily dose that any worker is exposed to is reduced by 58.8%, and the maximum TWA value for the workers is reduced by 3.8 dB from the current schedule.

  11. Teaching Geology on Weekends and at Shopping Centers.

    ERIC Educational Resources Information Center

    Mirsky, Arthur; East, James R.

    1981-01-01

    The success of an outreach education program held by Indiana University-Purdue University at Indianapolis is described. The college offers regular credit courses on Saturday and Sunday for people who could not take regularly scheduled courses. A Learn and Shop program held at shopping centers is also described. (JT)

  12. Generating effective project scheduling heuristics by abstraction and reconstitution

    NASA Technical Reports Server (NTRS)

    Janakiraman, Bhaskar; Prieditis, Armand

    1992-01-01

    A project scheduling problem consists of a finite set of jobs, each with fixed integer duration, requiring one or more resources such as personnel or equipment, and each subject to a set of precedence relations, which specify allowable job orderings, and a set of mutual exclusion relations, which specify jobs that cannot overlap. No job can be interrupted once started. The objective is to minimize project duration. This objective arises in nearly every large construction project--from software to hardware to buildings. Because such project scheduling problems are NP-hard, they are typically solved by branch-and-bound algorithms. In these algorithms, lower-bound duration estimates (admissible heuristics) are used to improve efficiency. One way to obtain an admissible heuristic is to remove (abstract) all resources and mutual exclusion constraints and then obtain the minimal project duration for the abstracted problem; this minimal duration is the admissible heuristic. Although such abstracted problems can be solved efficiently, they yield inaccurate admissible heuristics precisely because those constraints that are central to solving the original problem are abstracted. This paper describes a method to reconstitute the abstracted constraints back into the solution to the abstracted problem while maintaining efficiency, thereby generating better admissible heuristics. Our results suggest that reconstitution can make good admissible heuristics even better.

  13. Research on Production Scheduling System with Bottleneck Based on Multi-agent

    NASA Astrophysics Data System (ADS)

    Zhenqiang, Bao; Weiye, Wang; Peng, Wang; Pan, Quanke

    Aimed at the imbalance problem of resource capacity in Production Scheduling System, this paper uses Production Scheduling System based on multi-agent which has been constructed, and combines the dynamic and autonomous of Agent; the bottleneck problem in the scheduling is solved dynamically. Firstly, this paper uses Bottleneck Resource Agent to find out the bottleneck resource in the production line, analyses the inherent mechanism of bottleneck, and describes the production scheduling process based on bottleneck resource. Bottleneck Decomposition Agent harmonizes the relationship of job's arrival time and transfer time in Bottleneck Resource Agent and Non-Bottleneck Resource Agents, therefore, the dynamic scheduling problem is simplified as the single machine scheduling of each resource which takes part in the scheduling. Finally, the dynamic real-time scheduling problem is effectively solved in Production Scheduling System.

  14. Heuristic algorithms for the minmax regret flow-shop problem with interval processing times.

    PubMed

    Ćwik, Michał; Józefczyk, Jerzy

    2018-01-01

    An uncertain version of the permutation flow-shop with unlimited buffers and the makespan as a criterion is considered. The investigated parametric uncertainty is represented by given interval-valued processing times. The maximum regret is used for the evaluation of uncertainty. Consequently, the minmax regret discrete optimization problem is solved. Due to its high complexity, two relaxations are applied to simplify the optimization procedure. First of all, a greedy procedure is used for calculating the criterion's value, as such calculation is NP-hard problem itself. Moreover, the lower bound is used instead of solving the internal deterministic flow-shop. The constructive heuristic algorithm is applied for the relaxed optimization problem. The algorithm is compared with previously elaborated other heuristic algorithms basing on the evolutionary and the middle interval approaches. The conducted computational experiments showed the advantage of the constructive heuristic algorithm with regards to both the criterion and the time of computations. The Wilcoxon paired-rank statistical test confirmed this conclusion.

  15. Job satisfaction, job stress and psychosomatic health problems in software professionals in India

    PubMed Central

    Madhura, Sahukar; Subramanya, Pailoor; Balaram, Pradhan

    2014-01-01

    This questionnaire based study investigates correlation between job satisfaction, job stress and psychosomatic health in Indian software professionals. Also, examines how yoga practicing Indian software professionals cope up with stress and psychosomatic health problems. The sample consisted of yoga practicing and non-yoga practicing Indian software professionals working in India. The findings of this study have shown that there is significant correlation among job satisfaction, job stress and health. In Yoga practitioners job satisfaction is not significantly related to Psychosomatic health whereas in non-yoga group Psychosomatic Health symptoms showed significant relationship with Job satisfaction. PMID:25598623

  16. Resource-constrained scheduling with hard due windows and rejection penalties

    NASA Astrophysics Data System (ADS)

    Garcia, Christopher

    2016-09-01

    This work studies a scheduling problem where each job must be either accepted and scheduled to complete within its specified due window, or rejected altogether. Each job has a certain processing time and contributes a certain profit if accepted or penalty cost if rejected. There is a set of renewable resources, and no resource limit can be exceeded at any time. Each job requires a certain amount of each resource when processed, and the objective is to maximize total profit. A mixed-integer programming formulation and three approximation algorithms are presented: a priority rule heuristic, an algorithm based on the metaheuristic for randomized priority search and an evolutionary algorithm. Computational experiments comparing these four solution methods were performed on a set of generated benchmark problems covering a wide range of problem characteristics. The evolutionary algorithm outperformed the other methods in most cases, often significantly, and never significantly underperformed any method.

  17. Paint shop, coach shop, car shop, and blacksmith shop (all ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Paint shop, coach shop, car shop, and blacksmith shop (all car department), all north of the roadhouse and locomotive shops. Photographed between 1880 and 1888 - Chicago, Burlington & Quincy Railroad, Roundhouse & Shops, Broadway & Spring Streets, Aurora, Kane County, IL

  18. Balancing antagonistic time and resource utilization constraints in over-subscribed scheduling problems

    NASA Technical Reports Server (NTRS)

    Smith, Stephen F.; Pathak, Dhiraj K.

    1991-01-01

    In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.

  19. English in the Garment Shops.

    ERIC Educational Resources Information Center

    Verplaetse, Lorrie

    This text for limited-English-speaking workers in the garment industry consits of illustrated vocabulary words, grammar lessons, narratives or brief readings, and exercises on employment-related topics. The first section focuses on shop talk, including job-specific vocabulary, simple expressions and explanations, social language, seeking and…

  20. Learning dominance relations in combinatorial search problems

    NASA Technical Reports Server (NTRS)

    Yu, Chee-Fen; Wah, Benjamin W.

    1988-01-01

    Dominance relations commonly are used to prune unnecessary nodes in search graphs, but they are problem-dependent and cannot be derived by a general procedure. The authors identify machine learning of dominance relations and the applicable learning mechanisms. A study of learning dominance relations using learning by experimentation is described. This system has been able to learn dominance relations for the 0/1-knapsack problem, an inventory problem, the reliability-by-replication problem, the two-machine flow shop problem, a number of single-machine scheduling problems, and a two-machine scheduling problem. It is considered that the same methodology can be extended to learn dominance relations in general.

  1. Nature of job and psychiatric problems: the experiences of industrial workers.

    PubMed

    Perwez, Syed Khalid; Khalique, Abdul; Ramaseshan, H; Swamy, T N V R; Mansoor, Mohammed

    2014-10-09

    The present study aimed to examine the effect of nature of job (High risk/low risk) on psychiatric problems of 200 workers of Tata Motors Ltd. in Jamshedpur. The workers/participants were divided on the basis of the nature of their job (high/low risk) and their salary (high/low paid) resulting in four sub-groups with 50 participants respectively s. The Middlesex Hospital Questionnaire (M.H.Q) constructed by Crown and Crisp (1966) and adapted in Hindi by Srivastava and Bhat in 1974 was administered on the participants. Results clearly indicated that nature of job (high and low risk) played a significant role in creating psychiatric problems in workers. Workers doing high risk jobs showed a greater amount of psychiatric problems compared to workers doing low risk jobs in both high paid and low paid categories. Psychiatric problems included free-floating anxiety, obsessional traits and symptoms, phobic anxiety, somatic concomitants of anxiety, neurotic depression, and hysterical personality traits were seen more in high risk job workers. High risk job workers had significantly higher psychiatric problems compared to low risk job workers.

  2. A bicriteria heuristic for an elective surgery scheduling problem.

    PubMed

    Marques, Inês; Captivo, M Eugénia; Vaz Pato, Margarida

    2015-09-01

    Resource rationalization and reduction of waiting lists for surgery are two main guidelines for hospital units outlined in the Portuguese National Health Plan. This work is dedicated to an elective surgery scheduling problem arising in a Lisbon public hospital. In order to increase the surgical suite's efficiency and to reduce the waiting lists for surgery, two objectives are considered: maximize surgical suite occupation and maximize the number of surgeries scheduled. This elective surgery scheduling problem consists of assigning an intervention date, an operating room and a starting time for elective surgeries selected from the hospital waiting list. Accordingly, a bicriteria surgery scheduling problem arising in the hospital under study is presented. To search for efficient solutions of the bicriteria optimization problem, the minimization of a weighted Chebyshev distance to a reference point is used. A constructive and improvement heuristic procedure specially designed to address the objectives of the problem is developed and results of computational experiments obtained with empirical data from the hospital are presented. This study shows that by using the bicriteria approach presented here it is possible to build surgical plans with very good performance levels. This method can be used within an interactive approach with the decision maker. It can also be easily adapted to other hospitals with similar scheduling conditions.

  3. Parallel-aware, dedicated job co-scheduling within/across symmetric multiprocessing nodes

    DOEpatents

    Jones, Terry R.; Watson, Pythagoras C.; Tuel, William; Brenner, Larry; ,Caffrey, Patrick; Fier, Jeffrey

    2010-10-05

    In a parallel computing environment comprising a network of SMP nodes each having at least one processor, a parallel-aware co-scheduling method and system for improving the performance and scalability of a dedicated parallel job having synchronizing collective operations. The method and system uses a global co-scheduler and an operating system kernel dispatcher adapted to coordinate interfering system and daemon activities on a node and across nodes to promote intra-node and inter-node overlap of said interfering system and daemon activities as well as intra-node and inter-node overlap of said synchronizing collective operations. In this manner, the impact of random short-lived interruptions, such as timer-decrement processing and periodic daemon activity, on synchronizing collective operations is minimized on large processor-count SPMD bulk-synchronous programming styles.

  4. Doctor shopping: a concept analysis.

    PubMed

    Worley, Julie; Hall, Joanne M

    2012-01-01

    Prescription drug abuse is a significant problem in the United States that poses a serious health risk to Americans and is therefore significant to the field of nursing. The prescription drugs that are designated in the United States as having abuse potential are called controlled or scheduled drugs. The most common types of abused prescription drugs are benzodiazepines prescribed for anxiety, opioids prescribed for pain, and stimulants prescribed for attention deficit disorder. These prescription drugs are abused by taking larger doses than prescribed for nonmedical use to achieve a high or euphoric feeling, or are sold illicitly for profit. In 2009, there were 2.4 million nonmedical users of prescription opioids in the United States. These prescription drugs are often obtained by seeing multiple prescribers, often under false pretenses or with complicity from the prescribers that leads to abuse and illicit sales. The term doctor shopping has been used not only to refer to this phenomenon but has also had other meanings throughout the past decades. Thus, concept analysis is the focus of this article for clarification using the Walker and Avant method. Health implications and suggestions for minimizing doctor shopping are included.

  5. Stochastic scheduling on a repairable manufacturing system

    NASA Astrophysics Data System (ADS)

    Li, Wei; Cao, Jinhua

    1995-08-01

    In this paper, we consider some stochastic scheduling problems with a set of stochastic jobs on a manufacturing system with a single machine that is subject to multiple breakdowns and repairs. When the machine processing a job fails, the job processing must restart some time later when the machine is repaired. For this typical manufacturing system, we find the optimal policies that minimize the following objective functions: (1) the weighed sum of the completion times; (2) the weighed number of late jobs having constant due dates; (3) the weighted number of late jobs having random due dates exponentially distributed, which generalize some previous results.

  6. Emergency Radiology Practice Patterns: Shifts, Schedules, and Job Satisfaction.

    PubMed

    Hanna, Tarek N; Shekhani, Haris; Lamoureux, Christine; Mar, Hanna; Nicola, Refky; Sliker, Clint; Johnson, Jamlik-Omari

    2017-03-01

    To assess the practice environment of emergency radiologists with a focus on schedule, job satisfaction, and self-perception of health, wellness, and diagnostic accuracy. A survey drawing from prior radiology and health care shift-work literature was distributed via e-mail to national societies, teleradiology groups, and private practices. The survey remained open for 4 weeks in 2016, with one reminder. Data were analyzed using hypothesis testing and logistic regression modeling. Response rate was 29.6% (327/1106); 69.1% of respondents (n = 226) were greater than 40 years old, 73% (n = 240) were male, and 87% (n = 284) practiced full time. With regard to annual overnight shifts (NS): 36% (n = 118) did none, 24.9% (n = 81) did 182 or more, and 15.6% (n = 51) did 119. There was a significant association between average NS worked per year and both perceived negative health effects (P < .01) and negative impact on memory (P < .01). There was an inverse association between overall job enjoyment and number of annual NS (P < .05). The odds of agreeing to the statement "I enjoy my job" for radiologists who work no NS is 2.21 times greater than for radiologists who work at least 119 NS, when shift length is held constant. Radiologists with 11+ years of experience who work no NS or 1 to 100 NS annually have lower odds of feeling overwhelmed when compared with those working the same number of NS with <10 years' experience. There is significant variation in emergency radiology practice patterns. Annual NS burden is associated with lower job satisfaction and negative health self-perception. Copyright © 2016 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  7. Estimating job runtime for CMS analysis jobs

    NASA Astrophysics Data System (ADS)

    Sfiligoi, I.

    2014-06-01

    The basic premise of pilot systems is to create an overlay scheduling system on top of leased resources. And by definition, leases have a limited lifetime, so any job that is scheduled on such resources must finish before the lease is over, or it will be killed and all the computation is wasted. In order to effectively schedule jobs to resources, the pilot system thus requires the expected runtime of the users' jobs. Past studies have shown that relying on user provided estimates is not a valid strategy, so the system should try to make an estimate by itself. This paper provides a study of the historical data obtained from the Compact Muon Solenoid (CMS) experiment's Analysis Operations submission system. Clear patterns are observed, suggesting that making prediction of an expected job lifetime range is achievable with high confidence level in this environment.

  8. Interior of building 16 section, view north of machine shop, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of building 16 section, view north of machine shop, showing shrink-fitting a bearing sleeve onto a section of the propeller shaft for the aircraft carrier John F. Kennedy. The lathe on the extreme left of the photograph was used to machine bearing sleeves to final dimensions. This work, in August 1994, was the final major machine shop job done for the U.S. Navy. Photograph by Robert Stewart, August 1994. - Naval Base Philadelphia-Philadelphia Naval Shipyard, Machine Shops, League Island, Philadelphia, Philadelphia County, PA

  9. Work-related factors, job satisfaction and intent to leave the current job among United States nurses.

    PubMed

    Han, Kihye; Trinkoff, Alison M; Gurses, Ayse P

    2015-11-01

    To examine the relationships of work-related factors (e.g., autonomy, work schedule, supervisory and peer support) to nurses' job satisfaction and intent to leave their current position. Low job satisfaction and high turnover of nurses are major problems for health care. To improve nurse retention, work-related factors associated with job satisfaction and intent to leave should be investigated. A cross-sectional secondary data analysis. Data were obtained in 2004 from Wave 3 of the Nurses' Worklife and Health Study. A random sample of 5000 actively licenced nurses in Illinois and North Carolina (two U.S. states) were sent the survey in wave 1, of which 1641 actively working bedside nurses participated in wave 3. We examined associations of various work-related factors with job satisfaction and intent to leave the current position. Nurses who were dissatisfied with their job reported significantly higher psychological demands and lower autonomy than nurses who were satisfied. Nurses were significantly less satisfied with their jobs when they worked longer hours with inadequate breaks or sick days. Lack of support from peers and supervisors was also related to significantly lower odds of job satisfaction. For intention to leave, nurses who said they planned to leave their current job reported significantly lower autonomy and less support from their peers than nurses who intended to stay. A variety of modifiable work-related factors were significantly related to job satisfaction and intention to leave the current job among nurses. Future research should focus on developing interventions that could mitigate these factors (e.g., by improving work schedules, increasing autonomy and/or nurse support). The impact of such interventions on job satisfaction and intention to leave the current position could then be evaluated. To increase nurse retention, improved schedules, autonomy and supportive work environments should be promoted. © 2015 John Wiley & Sons Ltd.

  10. Analysis of Feeder Bus Network Design and Scheduling Problems

    PubMed Central

    Almasi, Mohammad Hadi; Karim, Mohamed Rehan

    2014-01-01

    A growing concern for public transit is its inability to shift passenger's mode from private to public transport. In order to overcome this problem, a more developed feeder bus network and matched schedules will play important roles. The present paper aims to review some of the studies performed on Feeder Bus Network Design and Scheduling Problem (FNDSP) based on three distinctive parts of the FNDSP setup, namely, problem description, problem characteristics, and solution approaches. The problems consist of different subproblems including data preparation, feeder bus network design, route generation, and feeder bus scheduling. Subsequently, descriptive analysis and classification of previous works are presented to highlight the main characteristics and solution methods. Finally, some of the issues and trends for future research are identified. This paper is targeted at dealing with the FNDSP to exhibit strategic and tactical goals and also contributes to the unification of the field which might be a useful complement to the few existing reviews. PMID:24526890

  11. The moderating effect of control over work scheduling and overtime on the relationship between workload demands and perceived job risk.

    PubMed

    Näswall, Katharina; Burt, Christopher D B; Pearce, Megan

    2015-01-01

    This study investigated the impact of workload demands on perceived job risk using the Job Demand-Control model as a research framework. The primary objective was to test the hypothesis that employee control over work scheduling and overtime would moderate the relationship between workload demands and perceived job risk. Ninety-six participants working in a variety of industries completed measures of workload demands, and of control over work scheduling and overtime, and a measure of perceived job risk. Workload demands predicted higher perceptions of job risk. However, the results also suggest that control over overtime moderated this relationship, where those with the combination of high workload demands and low control over overtime reported higher levels of perceived risk. The results indicate that the JDC model is applicable to safety research. The results suggest that employee control over workload demands is an important variable to consider in terms of managing workplace safety. The present study also points to important areas for future research to explore in order to further understand the connection between demands and safety.

  12. A note on resource allocation scheduling with group technology and learning effects on a single machine

    NASA Astrophysics Data System (ADS)

    Lu, Yuan-Yuan; Wang, Ji-Bo; Ji, Ping; He, Hongyu

    2017-09-01

    In this article, single-machine group scheduling with learning effects and convex resource allocation is studied. The goal is to find the optimal job schedule, the optimal group schedule, and resource allocations of jobs and groups. For the problem of minimizing the makespan subject to limited resource availability, it is proved that the problem can be solved in polynomial time under the condition that the setup times of groups are independent. For the general setup times of groups, a heuristic algorithm and a branch-and-bound algorithm are proposed, respectively. Computational experiments show that the performance of the heuristic algorithm is fairly accurate in obtaining near-optimal solutions.

  13. Periodic Heterogeneous Vehicle Routing Problem With Driver Scheduling

    NASA Astrophysics Data System (ADS)

    Mardiana Panggabean, Ellis; Mawengkang, Herman; Azis, Zainal; Filia Sari, Rina

    2018-01-01

    The paper develops a model for the optimal management of logistic delivery of a given commodity. The company has different type of vehicles with different capacity to deliver the commodity for customers. The problem is then called Periodic Heterogeneous Vehicle Routing Problem (PHVRP). The goal is to schedule the deliveries according to feasible combinations of delivery days and to determine the scheduling of fleet and driver and routing policies of the vehicles. The objective is to minimize the sum of the costs of all routes over the planning horizon. We propose a combined approach of heuristic algorithm and exact method to solve the problem.

  14. The application of artificial intelligence to astronomical scheduling problems

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  15. The One-Stop Job Shop.

    ERIC Educational Resources Information Center

    Kiser, Kim

    1998-01-01

    Minnesota's WorkForce Centers are a model of state employment services. The centers assist those in need of initiatives such as dislocated worker programs, welfare-to-work services, services for the blind, employment-and-training programs, veterans' services, and job-search assistance. (JOW)

  16. A Day at the Shopping Mall: Educational Computing in Action. Techniques.

    ERIC Educational Resources Information Center

    Gray, Robert A.; Gray, Dianne E.

    1988-01-01

    This report relates the experiences of a teacher who conducted a graduate computer education class at a shopping center in Dallas, Texas. The activity asked each member of the class to spend up to 5,000 mythical dollars on a hardware system and appropriate software to facilitate his/her current job performance. Students could "shop" in three…

  17. Job shop fails choosy nurses.

    PubMed

    1993-10-13

    Only 181 people have used the Clearing House set up to find jobs for redundant London nurses. And almost a quarter have rejected the posts which it says are suitable for them, with 21 per cent of employers turning down candidates selected by the initiative.

  18. A model for developing job rotation schedules that eliminate sequential high workloads and minimize between-worker variability in cumulative daily workloads: Application to automotive assembly lines.

    PubMed

    Yoon, Sang-Young; Ko, Jeonghan; Jung, Myung-Chul

    2016-07-01

    The aim of study is to suggest a job rotation schedule by developing a mathematical model in order to reduce cumulative workload from the successive use of the same body region. Workload assessment using rapid entire body assessment (REBA) was performed for the model in three automotive assembly lines of chassis, trim, and finishing to identify which body part exposed to relatively high workloads at workstations. The workloads were incorporated to the model to develop a job rotation schedule. The proposed schedules prevent the exposure to high workloads successively on the same body region and minimized between-worker variance in cumulative daily workload. Whereas some of workers were successively assigned to high workload workstation under no job rotation and serial job rotation. This model would help to reduce the potential for work-related musculoskeletal disorders (WMSDs) without additional cost for engineering work, although it may need more computational time and relative complex job rotation sequences. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  19. Job Hunting in Tougher Times.

    ERIC Educational Resources Information Center

    Ross, Steven S.

    1985-01-01

    Several resources to consider are offered to ease the squeeze created by the computer market downturn. Areas addressed include: job-shop option; other-industries option; overseas option; graduate school option; entrepreneurial option; military option; job fairs; and weighing locations. Notes that colleges are looking for engineering teachers,…

  20. Scheduling Capacitated One-Way Vehicles on Paths with Deadlines

    NASA Astrophysics Data System (ADS)

    Uchida, Jun; Karuno, Yoshiyuki; Nagamochi, Hiroshi

    In this paper, we deal with a scheduling problem of minimizing the number of employed vehicles on paths. Let G=(V,E) be a path with a set V={vi|i=1,2,...,n} of vertices and a set E={{vi,vi+1}|i=1,2,...,n-1} of edges. Vehicles with capacity b are initially situated at v1. There is a job i at each vertex vi∈V, which has its own handling time hi and deadline di. With each edge {vi,vi+1}∈E, a travel time wi,i+1 is associated. Each job is processed by exactly one vehicle, and the number of jobs processed by a vehicle does not exceed the capacity b. A routing of a vehicle is called one-way if the vehicle visits every edge {vi,vi+1} exactly once (i.e., it simply moves from v1 to vn on G). Any vehicle is assumed to follow the one-way routing constraint. The problem asks to find a schedule that minimizes the number of one-way vehicles, meeting the deadline and capacity constraints. A greedy heuristic is proposed, which repeats a dynamic programming procedure for a single one-way vehicle problem of maximizing the number of non-tardy jobs. We show that the greedy heuristic runs in O(n3) time, and the approximation ratio is at most ln b+1.

  1. Producing Satisfactory Solutions to Scheduling Problems: An Iterative Constraint Relaxation Approach

    NASA Technical Reports Server (NTRS)

    Chien, S.; Gratch, J.

    1994-01-01

    One drawback to using constraint-propagation in planning and scheduling systems is that when a problem has an unsatisfiable set of constraints such algorithms typically only show that no solution exists. While, technically correct, in practical situations, it is desirable in these cases to produce a satisficing solution that satisfies the most important constraints (typically defined in terms of maximizing a utility function). This paper describes an iterative constraint relaxation approach in which the scheduler uses heuristics to progressively relax problem constraints until the problem becomes satisfiable. We present empirical results of applying these techniques to the problem of scheduling spacecraft communications for JPL/NASA antenna resources.

  2. Constraint monitoring in TOSCA

    NASA Technical Reports Server (NTRS)

    Beck, Howard

    1992-01-01

    The Job-Shop Scheduling Problem (JSSP) deals with the allocation of resources over time to factory operations. Allocations are subject to various constraints (e.g., production precedence relationships, factory capacity constraints, and limits on the allowable number of machine setups) which must be satisfied for a schedule to be valid. The identification of constraint violations and the monitoring of constraint threats plays a vital role in schedule generation in terms of the following: (1) directing the scheduling process; and (2) informing scheduling decisions. This paper describes a general mechanism for identifying constraint violations and monitoring threats to the satisfaction of constraints throughout schedule generation.

  3. Solving a real-world problem using an evolving heuristically driven schedule builder.

    PubMed

    Hart, E; Ross, P; Nelson, J

    1998-01-01

    This work addresses the real-life scheduling problem of a Scottish company that must produce daily schedules for the catching and transportation of large numbers of live chickens. The problem is complex and highly constrained. We show that it can be successfully solved by division into two subproblems and solving each using a separate genetic algorithm (GA). We address the problem of whether this produces locally optimal solutions and how to overcome this. We extend the traditional approach of evolving a "permutation + schedule builder" by concentrating on evolving the schedule builder itself. This results in a unique schedule builder being built for each daily scheduling problem, each individually tailored to deal with the particular features of that problem. This results in a robust, fast, and flexible system that can cope with most of the circumstances imaginable at the factory. We also compare the performance of a GA approach to several other evolutionary methods and show that population-based methods are superior to both hill-climbing and simulated annealing in the quality of solutions produced. Population-based methods also have the distinct advantage of producing multiple, equally fit solutions, which is of particular importance when considering the practical aspects of the problem.

  4. Scheduling multicore workload on shared multipurpose clusters

    NASA Astrophysics Data System (ADS)

    Templon, J. A.; Acosta-Silva, C.; Flix Molina, J.; Forti, A. C.; Pérez-Calero Yzquierdo, A.; Starink, R.

    2015-12-01

    With the advent of workloads containing explicit requests for multiple cores in a single grid job, grid sites faced a new set of challenges in workload scheduling. The most common batch schedulers deployed at HEP computing sites do a poor job at multicore scheduling when using only the native capabilities of those schedulers. This paper describes how efficient multicore scheduling was achieved at the sites the authors represent, by implementing dynamically-sized multicore partitions via a minimalistic addition to the Torque/Maui batch system already in use at those sites. The paper further includes example results from use of the system in production, as well as measurements on the dependence of performance (especially the ramp-up in throughput for multicore jobs) on node size and job size.

  5. Developing optimal nurses work schedule using integer programming

    NASA Astrophysics Data System (ADS)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  6. Optimal pre-scheduling of problem remappings

    NASA Technical Reports Server (NTRS)

    Nicol, David M.; Saltz, Joel H.

    1987-01-01

    A large class of scientific computational problems can be characterized as a sequence of steps where a significant amount of computation occurs each step, but the work performed at each step is not necessarily identical. Two good examples of this type of computation are: (1) regridding methods which change the problem discretization during the course of the computation, and (2) methods for solving sparse triangular systems of linear equations. Recent work has investigated a means of mapping such computations onto parallel processors; the method defines a family of static mappings with differing degrees of importance placed on the conflicting goals of good load balance and low communication/synchronization overhead. The performance tradeoffs are controllable by adjusting the parameters of the mapping method. To achieve good performance it may be necessary to dynamically change these parameters at run-time, but such changes can impose additional costs. If the computation's behavior can be determined prior to its execution, it can be possible to construct an optimal parameter schedule using a low-order-polynomial-time dynamic programming algorithm. Since the latter can be expensive, the performance is studied of the effect of a linear-time scheduling heuristic on one of the model problems, and it is shown to be effective and nearly optimal.

  7. Towards an understanding of Internet-based problem shopping behaviour: The concept of online shopping addiction and its proposed predictors

    PubMed Central

    ROSE, SUSAN; DHANDAYUDHAM, ARUN

    2014-01-01

    Background: Compulsive and addictive forms of consumption and buying behaviour have been researched in both business and medical literature. Shopping enabled via the Internet now introduces new features to the shopping experience that translate to positive benefits for the shopper. Evidence now suggests that this new shopping experience may lead to problematic online shopping behaviour. This paper provides a theoretical review of the literature relevant to online shopping addiction (OSA). Based on this selective review, a conceptual model of OSA is presented. Method: The selective review of the literature draws on searches within databases relevant to both clinical and consumer behaviour literature including EBSCO, ABI Pro-Quest, Web of Science – Social Citations Index, Medline, PsycINFO and Pubmed. The article reviews current thinking on problematic, and specifically addictive, behaviour in relation to online shopping. Results: The review of the literature enables the extension of existing knowledge into the Internet-context. A conceptual model of OSA is developed with theoretical support provided for the inclusion of 7 predictor variables: low self-esteem, low self-regulation; negative emotional state; enjoyment; female gender; social anonymity and cognitive overload. The construct of OSA is defined and six component criteria of OSA are proposed based on established technological addiction criteria. Conclusions: Current Internet-based shopping experiences may trigger problematic behaviours which can be classified on a spectrum which at the extreme end incorporates OSA. The development of a conceptual model provides a basis for the future measurement and testing of proposed predictor variables and the outcome variable OSA. PMID:25215218

  8. Towards an understanding of Internet-based problem shopping behaviour: The concept of online shopping addiction and its proposed predictors.

    PubMed

    Rose, Susan; Dhandayudham, Arun

    2014-06-01

    Compulsive and addictive forms of consumption and buying behaviour have been researched in both business and medical literature. Shopping enabled via the Internet now introduces new features to the shopping experience that translate to positive benefits for the shopper. Evidence now suggests that this new shopping experience may lead to problematic online shopping behaviour. This paper provides a theoretical review of the literature relevant to online shopping addiction (OSA). Based on this selective review, a conceptual model of OSA is presented. The selective review of the literature draws on searches within databases relevant to both clinical and consumer behaviour literature including EBSCO, ABI Pro-Quest, Web of Science - Social Citations Index, Medline, PsycINFO and Pubmed. The article reviews current thinking on problematic, and specifically addictive, behaviour in relation to online shopping. The review of the literature enables the extension of existing knowledge into the Internet-context. A conceptual model of OSA is developed with theoretical support provided for the inclusion of 7 predictor variables: low self-esteem, low self-regulation; negative emotional state; enjoyment; female gender; social anonymity and cognitive overload. The construct of OSA is defined and six component criteria of OSA are proposed based on established technological addiction criteria. Current Internet-based shopping experiences may trigger problematic behaviours which can be classified on a spectrum which at the extreme end incorporates OSA. The development of a conceptual model provides a basis for the future measurement and testing of proposed predictor variables and the outcome variable OSA.

  9. A transportation-scheduling system for managing silvicultural projects

    Treesearch

    Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald

    2005-01-01

    A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...

  10. Algorithms for Scheduling and Network Problems

    DTIC Science & Technology

    1991-09-01

    time. We already know, by Lemma 2.2.1, that WOPT = O(log( mpU )), so if we could solve this integer program optimally we would be done. However, the...Folydirat, 15:177-191, 1982. [6] I.S. Belov and Ya. N. Stolin. An algorithm in a single path operations scheduling problem. In Mathematical Economics and

  11. A hybrid flowshop scheduling model considering dedicated machines and lot-splitting for the solar cell industry

    NASA Astrophysics Data System (ADS)

    Wang, Li-Chih; Chen, Yin-Yann; Chen, Tzu-Li; Cheng, Chen-Yang; Chang, Chin-Wei

    2014-10-01

    This paper studies a solar cell industry scheduling problem, which is similar to traditional hybrid flowshop scheduling (HFS). In a typical HFS problem, the allocation of machine resources for each order should be scheduled in advance. However, the challenge in solar cell manufacturing is the number of machines that can be adjusted dynamically to complete the job. An optimal production scheduling model is developed to explore these issues, considering the practical characteristics, such as hybrid flowshop, parallel machine system, dedicated machines, sequence independent job setup times and sequence dependent job setup times. The objective of this model is to minimise the makespan and to decide the processing sequence of the orders/lots in each stage, lot-splitting decisions for the orders and the number of machines used to satisfy the demands in each stage. From the experimental results, lot-splitting has significant effect on shortening the makespan, and the improvement effect is influenced by the processing time and the setup time of orders. Therefore, the threshold point to improve the makespan can be identified. In addition, the model also indicates that more lot-splitting approaches, that is, the flexibility of allocating orders/lots to machines is larger, will result in a better scheduling performance.

  12. Job Grading Standard for Materials Expediter WG-6705.

    ERIC Educational Resources Information Center

    Civil Service Commission, Washington, DC. Bureau of Policies and Standards.

    The standard is used to grade nonsupervisory jobs involved in routing and expediting the movement of parts, end items, supplies, and materials within production and repair facilities to meet priority needs. The work requires knowledge of material characteristics, uses, condition, industrial production shop procedures, shop layout, and internal…

  13. Scheduling Earth Observing Fleets Using Evolutionary Algorithms: Problem Description and Approach

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Morris, Robert; Clancy, Daniel (Technical Monitor)

    2002-01-01

    We describe work in progress concerning multi-instrument, multi-satellite scheduling. Most, although not all, Earth observing instruments currently in orbit are unique. In the relatively near future, however, we expect to see fleets of Earth observing spacecraft, many carrying nearly identical instruments. This presents a substantially new scheduling challenge. Inspired by successful commercial applications of evolutionary algorithms in scheduling domains, this paper presents work in progress regarding the use of evolutionary algorithms to solve a set of Earth observing related model problems. Both the model problems and the software are described. Since the larger problems will require substantial computation and evolutionary algorithms are embarrassingly parallel, we discuss our parallelization techniques using dedicated and cycle-scavenged workstations.

  14. Genetic algorithm to solve the problems of lectures and practicums scheduling

    NASA Astrophysics Data System (ADS)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  15. An Integrated Training Program for the UNCC Electrical and Air Conditioning Shops

    ERIC Educational Resources Information Center

    Currie, D. A.

    1975-01-01

    Describes the development of an on-the-job training program in the air conditioning and electrical shops of the University of North Carolina at Charlotte. The 1-year programs include a daily job training report, a formal one and one-half hour weekly training session using a correspondence course outline, and weekly 15-minute review sessions by…

  16. Applications of dynamic scheduling technique to space related problems: Some case studies

    NASA Astrophysics Data System (ADS)

    Nakasuka, Shinichi; Ninomiya, Tetsujiro

    1994-10-01

    The paper discusses the applications of 'Dynamic Scheduling' technique, which has been invented for the scheduling of Flexible Manufacturing System, to two space related scheduling problems: operation scheduling of a future space transportation system, and resource allocation in a space system with limited resources such as space station or space shuttle.

  17. Discrete Optimization Model for Vehicle Routing Problem with Scheduling Side Cosntraints

    NASA Astrophysics Data System (ADS)

    Juliandri, Dedy; Mawengkang, Herman; Bu'ulolo, F.

    2018-01-01

    Vehicle Routing Problem (VRP) is an important element of many logistic systems which involve routing and scheduling of vehicles from a depot to a set of customers node. This is a hard combinatorial optimization problem with the objective to find an optimal set of routes used by a fleet of vehicles to serve the demands a set of customers It is required that these vehicles return to the depot after serving customers’ demand. The problem incorporates time windows, fleet and driver scheduling, pick-up and delivery in the planning horizon. The goal is to determine the scheduling of fleet and driver and routing policies of the vehicles. The objective is to minimize the overall costs of all routes over the planning horizon. We model the problem as a linear mixed integer program. We develop a combination of heuristics and exact method for solving the model.

  18. Solving cyclical nurse scheduling problem using preemptive goal programming

    NASA Astrophysics Data System (ADS)

    Sundari, V. E.; Mardiyati, S.

    2017-07-01

    Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.

  19. Concurrent validation of a neurocognitive assessment protocol for clients with mental illness in job matching as shop sales in supported employment.

    PubMed

    Ng, S S W; Lak, D C C; Lee, S C K; Ng, P P K

    2015-03-01

    Occupational therapists play a major role in the assessment and referral of clients with severe mental illness for supported employment. Nonetheless, there is scarce literature about the content and predictive validity of the process. In addition, the criteria of successful job matching have not been analysed and job supervisors have relied on experience rather than objective standards in recruitment. This study aimed to explore the profile of successful clients working in 'shop sales' in a supportive environment using a neurocognitive assessment protocol, and to validate the protocol against 'internal standards' of the job supervisors. This was a concurrent validation study of criterion-related scales for a single job type. The subjective ratings from the supervisors were concurrently validated against the results of neurocognitive assessment of intellectual function and work-related cognitive behaviour. A regression model was established for clients who succeeded and failed in employment using supervisor's ratings and a cutoff value of 10.5 for the Performance Fitness Rating Scale (R(2) = 0.918, F[41] = 3.794, p = 0.003). Classification And Regression Tree was also plotted to identify the profile of cases, with an overall accuracy of 0.861 (relative error, 0.26). Use of both inference statistics and data mining techniques enables the decision tree of neurocognitive assessments to be more readily applied by therapists in vocational rehabilitation, and thus directly improve the efficiency and efficacy of the process.

  20. A New Lagrangian Relaxation Method Considering Previous Hour Scheduling for Unit Commitment Problem

    NASA Astrophysics Data System (ADS)

    Khorasani, H.; Rashidinejad, M.; Purakbari-Kasmaie, M.; Abdollahi, A.

    2009-08-01

    Generation scheduling is a crucial challenge in power systems especially under new environment of liberalization of electricity industry. A new Lagrangian relaxation method for unit commitment (UC) has been presented for solving generation scheduling problem. This paper focuses on the economical aspect of UC problem, while the previous hour scheduling as a very important issue is studied. In this paper generation scheduling of present hour has been conducted by considering the previous hour scheduling. The impacts of hot/cold start-up cost have been taken in to account in this paper. Case studies and numerical analysis presents significant outcomes while it demonstrates the effectiveness of the proposed method.

  1. The Role of Personal and Job Resources in the Relationship between Psychosocial Job Demands, Mental Strain, and Health Problems

    PubMed Central

    Mayerl, Hannes; Stolz, Erwin; Waxenegger, Anja; Rásky, Éva; Freidl, Wolfgang

    2016-01-01

    Recent research highlights the importance of both job resources and personal resources in the job demands-resources model. However, the results of previous studies on how these resources are related to each other and how they operate in relation to the health-impairment process of the job demands-resources model are ambiguous. Thus, the authors tested an alternative model, considering job and personal resources to be domains of the same underlying factor and linking this factor to the health-impairment process. Survey data of two Austrian occupational samples (N1 = 8657 and N2 = 9536) were analyzed using confirmatory factor analysis (CFA) and structural equation modeling (SEM). The results revealed that job and personal resources can be considered as indicators of a single resources factor which was negatively related to psychosocial job demands, mental strain, and health problems. Confirming previous studies, we further found that mental strain mediated the relationship between psychosocial job demands and health problems. Our findings suggest that interventions aimed at maintaining health in the context of work may take action on three levels: (1) the prevention of extensive job demands, (2) the reduction of work-related mental strain, and (3) the strengthening of resources. PMID:27582717

  2. Global flexibility--shop floor flexibility: what's a worker to do?

    PubMed

    Forrant, R

    1999-01-01

    For several years new forms of work organization have been introduced by U.S. management to cut labor costs, improve productivity, and increase their shop floor control. Corporations have also invested in computer-controlled machinery in an effort to eliminate large numbers of skilled blue-collar workers and to decrease their reliance on the tacit knowledge of such workers. Once seemingly secure jobs in diverse industries like airplanes, jet engines, machine tools, and computer chips, are no longer so stable. In an effort to expand their global reach and reorganize the workplace, managers are able to capitalize on two conflicted and conflicting attitudes among the workforce: the first, workers most deep-seated fear, the loss of a permanent job; the second, their aspirations to contribute their knowledge and skills in a positive way on the shop floor. In this article the reorganization of work at two western Massachusetts metalworking companies is described. What distinguishes these cases is the central role that the union played in the organized plant and the workers played in both plants to improve production and at least for now preserve jobs.

  3. Uncertainty management by relaxation of conflicting constraints in production process scheduling

    NASA Technical Reports Server (NTRS)

    Dorn, Juergen; Slany, Wolfgang; Stary, Christian

    1992-01-01

    Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules.

  4. Association between work-related health problems and job insecurity in permanent and temporary employees

    PubMed Central

    2013-01-01

    Objectives This research was conducted with an aim of determining the correlation between job insecurity and an employee’s work-related health problems among permanent and temporary workers. Methods Using the data from the First Korean Working Conditions Survey conducted in 2006, a total of 7,071 workers, excluding employers and the self-employed, were analyzed. Work-related health problems were categorized as backache, headache, abdominal pain, muscular pain, stress, fatigue, insomnia, anxiety or depression. Each problem was then analyzed for its relationship to job insecurity through logistic regression analysis. Results Among the 7,071 workers, 5,294 (74.9%) were permanent workers and 1,777 (25.1%) were temporary workers. For the permanent workers, presence of high or moderate job insecurity appeared more closely linked to backache, headache, abdominal pain, muscular pain, stress, fatigue, insomnia, anxiety, and depression compared to absence of job insecurity. However, for the temporary workers, only depression appeared to be associated with the presence of high job insecurity. Conclusion The study showed that the presence of job insecurity is correlated with work-related health problems. The deleterious effects of job insecurity appeared to be stronger in permanent than temporary workers. Additional research should investigate ways to effectively reduce job insecurity. PMID:24472497

  5. Training and certification of work schedule managers may improve shift scheduling practices

    DOT National Transportation Integrated Search

    2011-02-01

    The Federal Railroad Administration (FRA) Human Factors Research and Development (R&D) Program : sponsored the implementation of a strategic job analysis to investigate the job of work schedule managers : (WSMs) across a diverse range of industries t...

  6. A microeconomic scheduler for parallel computers

    NASA Technical Reports Server (NTRS)

    Stoica, Ion; Abdel-Wahab, Hussein; Pothen, Alex

    1995-01-01

    We describe a scheduler based on the microeconomic paradigm for scheduling on-line a set of parallel jobs in a multiprocessor system. In addition to the classical objectives of increasing the system throughput and reducing the response time, we consider fairness in allocating system resources among the users, and providing the user with control over the relative performances of his jobs. We associate with every user a savings account in which he receives money at a constant rate. When a user wants to run a job, he creates an expense account for that job to which he transfers money from his savings account. The job uses the funds in its expense account to obtain the system resources it needs for execution. The share of the system resources allocated to the user is directly related to the rate at which the user receives money; the rate at which the user transfers money into a job expense account controls the job's performance. We prove that starvation is not possible in our model. Simulation results show that our scheduler improves both system and user performances in comparison with two different variable partitioning policies. It is also shown to be effective in guaranteeing fairness and providing control over the performance of jobs.

  7. Job Proximity and the Urban Employment Problem: Do Suitable Nearby Jobs Improve Neighbourhood Employment Rates?: A Comment.

    ERIC Educational Resources Information Center

    Houston, Donald

    1998-01-01

    Discusses methodology to examine the problem of spatial mismatch of jobs, showing how the simple accessibility measures used by Daniel Immergluck (1998) are poor reflections of the availability of jobs to an individual and explaining why a gravity model is a favorable alternative. Also discusses the unsuitability of aggregate data for testing the…

  8. Job dissatisfaction as a contributor to stress-related mental health problems among Japanese civil servants.

    PubMed

    Tatsuse, Takashi; Sekine, Michikazu

    2013-01-01

    Although studies on the association of job dissatisfaction with mental health have been conducted in the past, few studies have dealt with the complicated links connecting job stress, job dissatisfaction, and stress-related illness. This study seeks to determine how job dissatisfaction is linked to common mental health issues. This study surveyed 3,172 civil servants (2,233 men and 939 women) in 1998, taking poor mental functioning, fatigue, and sleep disturbance as stress-related mental health problems. We examine how psychosocial risk factors at work and job dissatisfaction are associated independently with poor mental functioning, fatigue, and sleep disturbance after adjustment for other known risk factors, and how job dissatisfaction contributes to change in the degree of association between psychosocial risk factors at work and mental health problems. In general, psychosocial risk factors were independently associated with mental health problems. When adjusted for job dissatisfaction, not only was job satisfaction independently associated with mental health problems but it was also found that the association of psychosocial risk factors with mental health problems declined. Our results suggest that, although longitudinal research is necessary, attitudes toward satisfaction at work can potentially decrease the negative effects of psychosocial risk factors at work on mental health.

  9. Techniques for cash management in scheduling manufacturing operations

    NASA Astrophysics Data System (ADS)

    Morady Gohareh, Mehdy; Shams Gharneh, Naser; Ghasemy Yaghin, Reza

    2017-06-01

    The objective in traditional scheduling is usually time based. Minimizing the makespan, total flow times, total tardi costs, etc. are instances of these objectives. In manufacturing, processing each job entails a cost paying and price receiving. Thus, the objective should include some notion of managing the flow of cash. We have defined two new objectives: maximization of average and minimum available cash. For single machine scheduling, it is demonstrated that scheduling jobs in decreasing order of profit ratios maximizes the former and improves productivity. Moreover, scheduling jobs in increasing order of costs and breaking ties in decreasing order of prices maximizes the latter and creates protection against financial instability.

  10. Decision support for clinical laboratory capacity planning.

    PubMed

    van Merode, G G; Hasman, A; Derks, J; Goldschmidt, H M; Schoenmaker, B; Oosten, M

    1995-01-01

    The design of a decision support system for capacity planning in clinical laboratories is discussed. The DSS supports decisions concerning the following questions: how should the laboratory be divided into job shops (departments/sections), how should staff be assigned to workstations and how should samples be assigned to workstations for testing. The decision support system contains modules for supporting decisions at the overall laboratory level (concerning the division of the laboratory into job shops) and for supporting decisions at the job shop level (assignment of staff to workstations and sample scheduling). Experiments with these modules are described showing both the functionality and the validity.

  11. Single Machine Scheduling and Due Date Assignment with Past-Sequence-Dependent Setup Time and Position-Dependent Processing Time

    PubMed Central

    Zhao, Chuan-Li; Hsu, Hua-Feng

    2014-01-01

    This paper considers single machine scheduling and due date assignment with setup time. The setup time is proportional to the length of the already processed jobs; that is, the setup time is past-sequence-dependent (p-s-d). It is assumed that a job's processing time depends on its position in a sequence. The objective functions include total earliness, the weighted number of tardy jobs, and the cost of due date assignment. We analyze these problems with two different due date assignment methods. We first consider the model with job-dependent position effects. For each case, by converting the problem to a series of assignment problems, we proved that the problems can be solved in O(n 4) time. For the model with job-independent position effects, we proved that the problems can be solved in O(n 3) time by providing a dynamic programming algorithm. PMID:25258727

  12. Single machine scheduling and due date assignment with past-sequence-dependent setup time and position-dependent processing time.

    PubMed

    Zhao, Chuan-Li; Hsu, Chou-Jung; Hsu, Hua-Feng

    2014-01-01

    This paper considers single machine scheduling and due date assignment with setup time. The setup time is proportional to the length of the already processed jobs; that is, the setup time is past-sequence-dependent (p-s-d). It is assumed that a job's processing time depends on its position in a sequence. The objective functions include total earliness, the weighted number of tardy jobs, and the cost of due date assignment. We analyze these problems with two different due date assignment methods. We first consider the model with job-dependent position effects. For each case, by converting the problem to a series of assignment problems, we proved that the problems can be solved in O(n(4)) time. For the model with job-independent position effects, we proved that the problems can be solved in O(n(3)) time by providing a dynamic programming algorithm.

  13. Job Superscheduler Architecture and Performance in Computational Grid Environments

    NASA Technical Reports Server (NTRS)

    Shan, Hongzhang; Oliker, Leonid; Biswas, Rupak

    2003-01-01

    Computational grids hold great promise in utilizing geographically separated heterogeneous resources to solve large-scale complex scientific problems. However, a number of major technical hurdles, including distributed resource management and effective job scheduling, stand in the way of realizing these gains. In this paper, we propose a novel grid superscheduler architecture and three distributed job migration algorithms. We also model the critical interaction between the superscheduler and autonomous local schedulers. Extensive performance comparisons with ideal, central, and local schemes using real workloads from leading computational centers are conducted in a simulation environment. Additionally, synthetic workloads are used to perform a detailed sensitivity analysis of our superscheduler. Several key metrics demonstrate that substantial performance gains can be achieved via smart superscheduling in distributed computational grids.

  14. Doctor and pharmacy shopping for controlled substances.

    PubMed

    Peirce, Gretchen L; Smith, Michael J; Abate, Marie A; Halverson, Joel

    2012-06-01

    Prescription drug abuse is a major health concern nationwide, with West Virginia having one of the highest prescription drug death rates in the United States. Studies are lacking that compare living subjects with persons who died from drug overdose for evidence of doctor and pharmacy shopping for controlled substances. The study objectives were to compare deceased and living subjects in West Virginia for evidence of prior doctor and pharmacy shopping for controlled substances and to identify factors associated with drug-related death. A secondary data study was conducted using controlled substance, Schedule II-IV, prescription data from the West Virginia Controlled Substance Monitoring Program and drug-related death data compiled by the Forensic Drug Database between July 2005 and December 2007. A case-control design compared deceased subjects 18 years and older whose death was drug related with living subjects for prior doctor and pharmacy shopping. Logistic regression identified factors related to the odds of drug-related death. A significantly greater proportion of deceased subjects were doctor shoppers (25.21% vs. 3.58%) and pharmacy shoppers (17.48% vs. 1.30%) than living subjects. Approximately 20.23% of doctor shoppers were also pharmacy shoppers, and 55.60% of pharmacy shoppers were doctor shoppers. Younger age, greater number of prescriptions dispensed, exposure to opioids and benzodiazepines, and doctor and pharmacy shopping were factors with greater odds of drug-related death. Doctor and pharmacy shopping involving controlled substances were identified, and shopping behavior was associated with drug-related death. Prescription monitoring programs may be useful in identifying potential shoppers at the point of care.

  15. Bidding-based autonomous process planning and scheduling

    NASA Astrophysics Data System (ADS)

    Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.

    1995-08-01

    Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.

  16. Teacher Liability in School-Shop Accidents.

    ERIC Educational Resources Information Center

    Kegin, Denis J.

    The intent of the book is to stimulate interest in the problem of shop-teacher liability and to identify certain needs which have not been adequately met by existing laws and statutes. Chapter 1, The Significance of Teacher Liability, discusses basic legal considerations, the environment of the school shop, and the possibility of liability.…

  17. Does distraction facilitate problem-focused coping with job stress? A 1 year longitudinal study.

    PubMed

    Shimazu, Akihito; Schaufeli, Wilmar B

    2007-10-01

    This study examined the sole and combined effects of problem-focused coping and distraction on employee well-being (i.e., stress responses and job performance) using two-wave panel survey data with a 1-year time lag. Participants were 488 male employees, who worked for a construction machinery company in western Japan. Hierarchical multiple regression analyses were conducted to examine whether distraction moderates the relationship of problem-focused coping with well-being. More use of problem-focused coping was negatively related to subsequent stress responses among those high in distraction. The combination of high problem-focused coping and high distraction was positively related to subsequent job performance, although it was limited only to the high job stress situation. Results suggest that the combination of high problem-focused coping and high distraction may lead to lower stress responses and better performance (but only in high job stress situations for performance) than the combination of high problem-focused coping and low distraction, at least for male blue-collar workers.

  18. Opioid shopping behavior: how often, how soon, which drugs, and what payment method.

    PubMed

    Cepeda, M Soledad; Fife, Daniel; Chow, Wing; Mastrogiovanni, Gregory; Henderson, Scott C

    2013-01-01

    Doctor shopping (obtaining opioid prescriptions from multiple prescribers) is one example of opioid abuse and diversion. The authors assessed how soon shopping behavior was observed after opioid exposure, number of events per shopper, preferred opioids, and method of payment. This was a cohort study. Individuals with ≤1 dispensing for any opioid in 2008 were followed for 18 months. Shopping behavior was defined as ≤2 prescriptions by different prescribers with ≤1 day of overlap and filled at ≤3 pharmacies. Of 25,161,024 subjects, 0.30% exhibited shopping behavior. Opioid-experienced subjects were 13.7 times more likely to exhibit shopping behavior and had more shopping episodes than opioid-naive subjects. Time to first shopping event was 246.90 ± 163.61 days. Number of episodes was 2.74 ± 4.66. Most subjects with shopping behavior (55.27%) had 1 shopping episode, whereas 9.52% had ≤6 episodes; 88.99% had ≤4 prescribers. Subjects with shopping behavior filled schedule II opioids more often than subjects without shopping behavior (19.51% vs 10.89%) and more often paid in cash (44.85% vs 18.54%). Three of 1000 people exposed to opioids exhibit shopping behavior, on average, 8 months after exposure. Opioid shoppers seek strong opioids, avoid combination products, often pay cash, and obtain prescriptions from few prescribers. © 2012 The Author(s).

  19. An Adaptive Niching Genetic Algorithm using a niche size equalization mechanism

    NASA Astrophysics Data System (ADS)

    Nagata, Yuichi

    Niching GAs have been widely investigated to apply genetic algorithms (GAs) to multimodal function optimization problems. In this paper, we suggest a new niching GA that attempts to form niches, each consisting of an equal number of individuals. The proposed GA can be applied also to combinatorial optimization problems by defining a distance metric in the search space. We apply the proposed GA to the job-shop scheduling problem (JSP) and demonstrate that the proposed niching method enhances the ability to maintain niches and improve the performance of GAs.

  20. Multi-trip vehicle routing and scheduling problem with time window in real life

    NASA Astrophysics Data System (ADS)

    Sze, San-Nah; Chiew, Kang-Leng; Sze, Jeeu-Fong

    2012-09-01

    This paper studies a manpower scheduling problem with multiple maintenance operations and vehicle routing considerations. Service teams located at a common service centre are required to travel to different customer sites. All customers must be served within given time window, which are known in advance. The scheduling process must take into consideration complex constraints such as a meal break during the team's shift, multiple travelling trips, synchronisation of service teams and working shifts. The main objective of this study is to develop a heuristic that can generate high quality solution in short time for large problem instances. A Two-stage Scheduling Heuristic is developed for different variants of the problem. Empirical results show that the proposed solution performs effectively and efficiently. In addition, our proposed approximation algorithm is very flexible and can be easily adapted to different scheduling environments and operational requirements.

  1. Solving Power Tool Problems in the School Shop

    ERIC Educational Resources Information Center

    Irvin, Daniel W.

    1976-01-01

    The school shop instructor is largely responsible for the preventive maintenance of power tools. These preventive measures primarily involve proper alignment, good lubrication, a reasonable maintenance program, and good operating procedures. Suggestions for maintenance of specific equipment is provided. (Author/BP)

  2. 20 CFR 638.505 - Scheduling of training.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Scheduling of training. 638.505 Section 638.505 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.505 Scheduling of training...

  3. Your Shopping Dollar. [Revised.] Money Management.

    ERIC Educational Resources Information Center

    Baran, Nancy H., Ed.; Tarrant, Sharon M., Ed.

    This booklet on shopping, 1 in a series of 12, covers all the basic aspects of personal- and family-money management. Suitable for use by high school and college students as well as adults, this handbook tells how to plan spending, develop shopping skills, and handle consumer problems effectively. Section 1 on consumers and the economy overviews…

  4. Peer-to-peer Cooperative Scheduling Architecture for National Grid Infrastructure

    NASA Astrophysics Data System (ADS)

    Matyska, Ludek; Ruda, Miroslav; Toth, Simon

    For some ten years, the Czech National Grid Infrastructure MetaCentrum uses a single central PBSPro installation to schedule jobs across the country. This centralized approach keeps a full track about all the clusters, providing support for jobs spanning several sites, implementation for the fair-share policy and better overall control of the grid environment. Despite a steady progress in the increased stability and resilience to intermittent very short network failures, growing number of sites and processors makes this architecture, with a single point of failure and scalability limits, obsolete. As a result, a new scheduling architecture is proposed, which relies on higher autonomy of clusters. It is based on a peer to peer network of semi-independent schedulers for each site or even cluster. Each scheduler accepts jobs for the whole infrastructure, cooperating with other schedulers on implementation of global policies like central job accounting, fair-share, or submission of jobs across several sites. The scheduling system is integrated with the Magrathea system to support scheduling of virtual clusters, including the setup of their internal network, again eventually spanning several sites. On the other hand, each scheduler is local to one of several clusters and is able to directly control and submit jobs to them even if the connection of other scheduling peers is lost. In parallel to the change of the overall architecture, the scheduling system itself is being replaced. Instead of PBSPro, chosen originally for its declared support of large scale distributed environment, the new scheduling architecture is based on the open-source Torque system. The implementation and support for the most desired properties in PBSPro and Torque are discussed and the necessary modifications to Torque to support the MetaCentrum scheduling architecture are presented, too.

  5. A multiagent evolutionary algorithm for constraint satisfaction problems.

    PubMed

    Liu, Jing; Zhong, Weicai; Jiao, Licheng

    2006-02-01

    With the intrinsic properties of constraint satisfaction problems (CSPs) in mind, we divide CSPs into two types, namely, permutation CSPs and nonpermutation CSPs. According to their characteristics, several behaviors are designed for agents by making use of the ability of agents to sense and act on the environment. These behaviors are controlled by means of evolution, so that the multiagent evolutionary algorithm for constraint satisfaction problems (MAEA-CSPs) results. To overcome the disadvantages of the general encoding methods, the minimum conflict encoding is also proposed. Theoretical analyzes show that MAEA-CSPs has a linear space complexity and converges to the global optimum. The first part of the experiments uses 250 benchmark binary CSPs and 79 graph coloring problems from the DIMACS challenge to test the performance of MAEA-CSPs for nonpermutation CSPs. MAEA-CSPs is compared with six well-defined algorithms and the effect of the parameters is analyzed systematically. The second part of the experiments uses a classical CSP, n-queen problems, and a more practical case, job-shop scheduling problems (JSPs), to test the performance of MAEA-CSPs for permutation CSPs. The scalability of MAEA-CSPs along n for n-queen problems is studied with great care. The results show that MAEA-CSPs achieves good performance when n increases from 10(4) to 10(7), and has a linear time complexity. Even for 10(7)-queen problems, MAEA-CSPs finds the solutions by only 150 seconds. For JSPs, 59 benchmark problems are used, and good performance is also obtained.

  6. Machine Shop Practice. Trade and Industrial Education Course of Study.

    ERIC Educational Resources Information Center

    Emerly, Robert J.; And Others

    Designed for secondary school students who are interested in becoming machinists, this beginning course guide in machine shop practice is organized into the following sections: (1) Introduction, (2) instructional plan, (3) educational philosophy, (4) specific course objectives, (5) course outline, (6) job sheets, and (7) operation sheets. The…

  7. Construction schedules slack time minimizing

    NASA Astrophysics Data System (ADS)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  8. Competency-Based Education Curriculum for Machine Shop. Student Material.

    ERIC Educational Resources Information Center

    Associated Educational Consultants, Inc., Pittsburgh, PA.

    This publication contains the student material for the machine shop competency-based education curriculum for secondary students in West Virginia. It has been developed to facilitate the learning of skills necessary for a career as a machinist. The tasks in the curriculum are those actually performed on the job. The materials are intended for use…

  9. Doing the Job Better

    ERIC Educational Resources Information Center

    Amer Vocat J, 1970

    1970-01-01

    The topics of six speeches presented at the 1969 American Vocational Convention include a bilingual office occupations project, distributive education in a rural setting, vocational subject mix and on the job training curriculum, integrated shop programs for small high schools, and innovations in industrial arts and home economics. (BC)

  10. Scheduling of hybrid types of machines with two-machine flowshop as the first type and a single machine as the second type

    NASA Astrophysics Data System (ADS)

    Hsiao, Ming-Chih; Su, Ling-Huey

    2018-02-01

    This research addresses the problem of scheduling hybrid machine types, in which one type is a two-machine flowshop and another type is a single machine. A job is either processed on the two-machine flowshop or on the single machine. The objective is to determine a production schedule for all jobs so as to minimize the makespan. The problem is NP-hard since the two parallel machines problem was proved to be NP-hard. Simulated annealing algorithms are developed to solve the problem optimally. A mixed integer programming (MIP) is developed and used to evaluate the performance for two SAs. Computational experiments demonstrate the efficiency of the simulated annealing algorithms, the quality of the simulated annealing algorithms will also be reported.

  11. Feasibility Study of Problems in the Collection of Data on Job Vacancies.

    ERIC Educational Resources Information Center

    Illinois State Dept. of Labor, Chicago. Bureau of Employment Security.

    Sixty-two firms within 20 industries were surveyed to determine (1) a definition for the term "job vacancy," (2) the extent of job vacancy records of employers, (3) the possibility of data collection on job vacancies, and (4) the problems expected to be encountered in such a collection. After stratification of an industry by the relative size of…

  12. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem.

    PubMed

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods.

  13. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem

    PubMed Central

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods. PMID:26176764

  14. Scheduling revisited workstations in integrated-circuit fabrication

    NASA Technical Reports Server (NTRS)

    Kline, Paul J.

    1992-01-01

    The cost of building new semiconductor wafer fabrication factories has grown rapidly, and a state-of-the-art fab may cost 250 million dollars or more. Obtaining an acceptable return on this investment requires high productivity from the fabrication facilities. This paper describes the Photo Dispatcher system which was developed to make machine-loading recommendations on a set of key fab machines. Dispatching policies that generally perform well in job shops (e.g., Shortest Remaining Processing Time) perform poorly for workstations such as photolithography which are visited several times by the same lot of silicon wafers. The Photo Dispatcher evaluates the history of workloads throughout the fab and identifies bottleneck areas. The scheduler then assigns priorities to lots depending on where they are headed after photolithography. These priorities are designed to avoid starving bottleneck workstations and to give preference to lots that are headed to areas where they can be processed with minimal waiting. Other factors considered by the scheduler to establish priorities are the nearness of a lot to the end of its process flow and the time that the lot has already been waiting in queue. Simulations that model the equipment and products in one of Texas Instrument's wafer fabs show the Photo Dispatcher can produce a 10 percent improvement in the time required to fabricate integrated circuits.

  15. Retail Flower Shop Salesperson and Floral Designer. Student's Manual.

    ERIC Educational Resources Information Center

    South Carolina State Dept. of Education, Columbia. Office of Vocational Education.

    This document consists of the student manual for a course in retail flower shop sales and floral design for use in vocational education courses in high schools in South Carolina. The guide consists of 22 learning modules that incorporate the subject matter needed by workers in these jobs. Each learning module consists of an introduction,…

  16. Implementation and Evaluation of Self-Scheduling in a Hospital System.

    PubMed

    Wright, Christina; McCartt, Peggy; Raines, Diane; Oermann, Marilyn H

    Inflexible work schedules affect job satisfaction and influence nurse turnover. Job satisfaction is a significant predictor of nurse retention. Acute care hospitals report that job satisfaction is influenced by autonomy and educational opportunity. This project discusses implementation of computer-based self-scheduling in a hospital system and its impact. It is important for staff development educators to be aware that self-scheduling may play a key role in autonomy, professional development, turnover, and hospital costs.

  17. Learning With Case-Injected Genetic Algorithms

    DTIC Science & Technology

    2004-08-01

    JSSP ) offers an example of a problem that is suited to an 001 1 L[]1 order-based encoding where where the order of the allelles 010 1 1 matters. Order...8217 t. ýt2 * .tl problem. The next section uses the JSSP to propose and evaluate a solution similarity distance metric for order-based encodings. P1’ P2...P3 . Pn Fig. 7. Individual represents an allocation of platforms to targets. VII. JOB SHOP SCHEDULING ( JSSP ) The JSSP has been well studied elsewhere

  18. 77 FR 34854 - Prevailing Rate Systems; Special Wage Schedules for Nonappropriated Fund Automotive Mechanics

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ..., and job-grading standards for uniform application by all Federal agencies. While most FWS employees... hours required to complete a particular job. Since the change would de-link shop labor rates from... survey of similar jobs in the local area annually. An hourly flat rate would be established for each of...

  19. Fatigue Risk Management: The Impact of Anesthesiology Residents' Work Schedules on Job Performance and a Review of Potential Countermeasures.

    PubMed

    Wong, Lily R; Flynn-Evans, Erin; Ruskin, Keith J

    2018-04-01

    Long duty periods and overnight call shifts impair physicians' performance on measures of vigilance, psychomotor functioning, alertness, and mood. Anesthesiology residents typically work between 64 and 70 hours per week and are often required to work 24 hours or overnight shifts, sometimes taking call every third night. Mitigating the effects of sleep loss, circadian misalignment, and sleep inertia requires an understanding of the relationship among work schedules, fatigue, and job performance. This article reviews the current Accreditation Council for Graduate Medical Education guidelines for resident duty hours, examines how anesthesiologists' work schedules can affect job performance, and discusses the ramifications of overnight and prolonged duty hours on patient safety and resident well-being. We then propose countermeasures that have been implemented to mitigate the effects of fatigue and describe how training programs or practice groups who must work overnight can adapt these strategies for use in a hospital setting. Countermeasures include the use of scheduling interventions, strategic naps, microbreaks, caffeine use during overnight and extended shifts, and the use of bright lights in the clinical setting when possible or personal blue light devices when the room lights must be turned off. Although this review focuses primarily on anesthesiology residents in training, many of the mitigation strategies described here can be used effectively by physicians in practice.

  20. Artificial immune algorithm for multi-depot vehicle scheduling problems

    NASA Astrophysics Data System (ADS)

    Wu, Zhongyi; Wang, Donggen; Xia, Linyuan; Chen, Xiaoling

    2008-10-01

    In the fast-developing logistics and supply chain management fields, one of the key problems in the decision support system is that how to arrange, for a lot of customers and suppliers, the supplier-to-customer assignment and produce a detailed supply schedule under a set of constraints. Solutions to the multi-depot vehicle scheduling problems (MDVRP) help in solving this problem in case of transportation applications. The objective of the MDVSP is to minimize the total distance covered by all vehicles, which can be considered as delivery costs or time consumption. The MDVSP is one of nondeterministic polynomial-time hard (NP-hard) problem which cannot be solved to optimality within polynomial bounded computational time. Many different approaches have been developed to tackle MDVSP, such as exact algorithm (EA), one-stage approach (OSA), two-phase heuristic method (TPHM), tabu search algorithm (TSA), genetic algorithm (GA) and hierarchical multiplex structure (HIMS). Most of the methods mentioned above are time consuming and have high risk to result in local optimum. In this paper, a new search algorithm is proposed to solve MDVSP based on Artificial Immune Systems (AIS), which are inspirited by vertebrate immune systems. The proposed AIS algorithm is tested with 30 customers and 6 vehicles located in 3 depots. Experimental results show that the artificial immune system algorithm is an effective and efficient method for solving MDVSP problems.

  1. A Study on Real-Time Scheduling Methods in Holonic Manufacturing Systems

    NASA Astrophysics Data System (ADS)

    Iwamura, Koji; Taimizu, Yoshitaka; Sugimura, Nobuhiro

    Recently, new architectures of manufacturing systems have been proposed to realize flexible control structures of the manufacturing systems, which can cope with the dynamic changes in the volume and the variety of the products and also the unforeseen disruptions, such as failures of manufacturing resources and interruptions by high priority jobs. They are so called as the autonomous distributed manufacturing system, the biological manufacturing system and the holonic manufacturing system. Rule-based scheduling methods were proposed and applied to the real-time production scheduling problems of the HMS (Holonic Manufacturing System) in the previous report. However, there are still remaining problems from the viewpoint of the optimization of the whole production schedules. New procedures are proposed, in the present paper, to select the production schedules, aimed at generating effective production schedules in real-time. The proposed methods enable the individual holons to select suitable machining operations to be carried out in the next time period. Coordination process among the holons is also proposed to carry out the coordination based on the effectiveness values of the individual holons.

  2. Job Management Requirements for NAS Parallel Systems and Clusters

    NASA Technical Reports Server (NTRS)

    Saphir, William; Tanner, Leigh Ann; Traversat, Bernard

    1995-01-01

    A job management system is a critical component of a production supercomputing environment, permitting oversubscribed resources to be shared fairly and efficiently. Job management systems that were originally designed for traditional vector supercomputers are not appropriate for the distributed-memory parallel supercomputers that are becoming increasingly important in the high performance computing industry. Newer job management systems offer new functionality but do not solve fundamental problems. We address some of the main issues in resource allocation and job scheduling we have encountered on two parallel computers - a 160-node IBM SP2 and a cluster of 20 high performance workstations located at the Numerical Aerodynamic Simulation facility. We describe the requirements for resource allocation and job management that are necessary to provide a production supercomputing environment on these machines, prioritizing according to difficulty and importance, and advocating a return to fundamental issues.

  3. Productivity and Job Security: Attrition--Benefits and Problems.

    ERIC Educational Resources Information Center

    National Center for Productivity and Quality of Working Life, Washington, DC.

    Three case studies are presented to document different approaches to providing the job security which would encourage acceptance of technological changes that could result in productivity improvements. The intent is to assist union and management practitioners in handling similar problems in their own firms. Focus is on the utility of attrition…

  4. Job design and ethnic differences in working women's physical activity.

    PubMed

    Grzywacz, Joseph G; Crain, A Lauren; Martinson, Brian C; Quandt, Sara A

    2014-01-01

    To document the role job control and schedule control play in shaping women's physical activity, and how it delineates educational and racial variability in associations of job and social control with physical activity. Prospective data were obtained from a community-based sample of working women (N = 302). Validated instruments measured job control and schedule control. Steps per day were assessed using New Lifestyles 800 activity monitors. Greater job control predicted more steps per day, whereas greater schedule control predicted fewer steps. Small indirect associations between ethnicity and physical activity were observed among women with a trade school degree or less but not for women with a college degree. Low job control created barriers to physical activity among working women with a trade school degree or less. Greater schedule control predicted less physical activity, suggesting women do not use time "created" by schedule flexibility for personal health enhancement.

  5. 16. Interior, Machine Shop, Roundhouse Machine Shop Extension, Southern Pacific ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Interior, Machine Shop, Roundhouse Machine Shop Extension, Southern Pacific Railroad Carlin Shops, view to south (90mm lens). Note the large segmental-arched doorway to move locomotives in and out of Machine Shop. - Southern Pacific Railroad, Carlin Shops, Roundhouse Machine Shop Extension, Foot of Sixth Street, Carlin, Elko County, NV

  6. Alternative work schedules for female pharmacists.

    PubMed

    Mason, N A; Perry, W R; Ryan, M L

    1991-01-01

    The impact of the increased proportion of women in pharmacy is discussed, and two leadership positions for which part-time work schedules were implemented are described. Issues associated with the increased representation of women include pharmacist shortages, loss of future leaders, decreased staff productivity related to inadequate day-care services, and a reduced earning potential of pharmacists. Many of these problems can be addressed by altering benefit packages and work schedules to enable employees to raise children while continuing to work. Specific strategies include legislation, day-care programs, flex time and flex scheduling, telecommuting, and the creation of alternative work schedules or permanent part-time positions. At the University of Michigan, a part-time position that combines faculty and clinical responsibilities has been in place since 1988. At The Washington Hospital Center, one of the three assistant director of pharmacy positions is part-time. The women in both positions have met or exceeded job performance requirements while raising a family. Issues raised by the increasing number of female pharmacists must be addressed by the profession. Part-time work schedules are one strategy for enabling female pharmacists to meet both their family and career responsibilities.

  7. 14. Interior, Machine Shop, Roundhouse Machine Shop Extension, Southern Pacific ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Interior, Machine Shop, Roundhouse Machine Shop Extension, Southern Pacific Railroad Carlin Shops, view to north (90mm lens). - Southern Pacific Railroad, Carlin Shops, Roundhouse Machine Shop Extension, Foot of Sixth Street, Carlin, Elko County, NV

  8. 12. Interior, Blacksmith Shop, Roundhouse Machine Shop Extension, Southern Pacific ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Interior, Blacksmith Shop, Roundhouse Machine Shop Extension, Southern Pacific Railroad Carlin Shops, view to northwest (90mm lens). - Southern Pacific Railroad, Carlin Shops, Roundhouse Machine Shop Extension, Foot of Sixth Street, Carlin, Elko County, NV

  9. Some Results of Weak Anticipative Concept Applied in Simulation Based Decision Support in Enterprise

    NASA Astrophysics Data System (ADS)

    Kljajić, Miroljub; Kofjač, Davorin; Kljajić Borštnar, Mirjana; Škraba, Andrej

    2010-11-01

    The simulation models are used as for decision support and learning in enterprises and in schools. Tree cases of successful applications demonstrate usefulness of weak anticipative information. Job shop scheduling production with makespan criterion presents a real case customized flexible furniture production optimization. The genetic algorithm for job shop scheduling optimization is presented. Simulation based inventory control for products with stochastic lead time and demand describes inventory optimization for products with stochastic lead time and demand. Dynamic programming and fuzzy control algorithms reduce the total cost without producing stock-outs in most cases. Values of decision making information based on simulation were discussed too. All two cases will be discussed from optimization, modeling and learning point of view.

  10. Eyes Wide Shopped: Shopping Situations Trigger Arousal in Impulsive Buyers

    PubMed Central

    Serfas, Benjamin G.; Büttner, Oliver B.; Florack, Arnd

    2014-01-01

    The present study proposes arousal as an important mechanism driving buying impulsiveness. We examined the effect of buying impulsiveness on arousal in non-shopping and shopping contexts. In an eye-tracking experiment, we measured pupil dilation while participants viewed and rated pictures of shopping scenes and non-shopping scenes. The results demonstrated that buying impulsiveness is closely associated with arousal as response to viewing pictures of shopping scenes. This pertained for hedonic shopping situations as well as for utilitarian shopping situations. Importantly, the effect did not emerge for non-shopping scenes. Furthermore, we demonstrated that arousal of impulsive buyers is independent from cognitive evaluation of scenes in the pictures. PMID:25489955

  11. Eyes wide shopped: shopping situations trigger arousal in impulsive buyers.

    PubMed

    Serfas, Benjamin G; Büttner, Oliver B; Florack, Arnd

    2014-01-01

    The present study proposes arousal as an important mechanism driving buying impulsiveness. We examined the effect of buying impulsiveness on arousal in non-shopping and shopping contexts. In an eye-tracking experiment, we measured pupil dilation while participants viewed and rated pictures of shopping scenes and non-shopping scenes. The results demonstrated that buying impulsiveness is closely associated with arousal as response to viewing pictures of shopping scenes. This pertained for hedonic shopping situations as well as for utilitarian shopping situations. Importantly, the effect did not emerge for non-shopping scenes. Furthermore, we demonstrated that arousal of impulsive buyers is independent from cognitive evaluation of scenes in the pictures.

  12. Alaska Job Center Network

    Science.gov Websites

    Job Centers Toll-free in Alaska (877)724-2539 *Workshop Schedules are linked under participating Job : midtown.jobcenter@alaska.gov Employers: anchorage.employers@alaska.gov Toll free Anchorage Employer Phone: 1-888-830 -1149 Phone: 842-5579 Fax: 842-5679, Toll Free: 1-800-478-5579 Job Seekers & Employers

  13. Putting it All Together: Has One-Stop Shopping Arrived?

    ERIC Educational Resources Information Center

    Flanagan, Patrick

    1997-01-01

    Reviews the current state of "one-stop shopping" for telecom services. Discusses regulatory obstacles; administrative problems with single billing; and resistance of telecom providers to change. Concludes that the leading one-stop shopping providers will be individual carriers who offer cost savings. (AEF)

  14. Multiobjective optimisation design for enterprise system operation in the case of scheduling problem with deteriorating jobs

    NASA Astrophysics Data System (ADS)

    Wang, Hongfeng; Fu, Yaping; Huang, Min; Wang, Junwei

    2016-03-01

    The operation process design is one of the key issues in the manufacturing and service sectors. As a typical operation process, the scheduling with consideration of the deteriorating effect has been widely studied; however, the current literature only studied single function requirement and rarely considered the multiple function requirements which are critical for a real-world scheduling process. In this article, two function requirements are involved in the design of a scheduling process with consideration of the deteriorating effect and then formulated into two objectives of a mathematical programming model. A novel multiobjective evolutionary algorithm is proposed to solve this model with combination of three strategies, i.e. a multiple population scheme, a rule-based local search method and an elitist preserve strategy. To validate the proposed model and algorithm, a series of randomly-generated instances are tested and the experimental results indicate that the model is effective and the proposed algorithm can achieve the satisfactory performance which outperforms the other state-of-the-art multiobjective evolutionary algorithms, such as nondominated sorting genetic algorithm II and multiobjective evolutionary algorithm based on decomposition, on all the test instances.

  15. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  16. Multi-core processing and scheduling performance in CMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hernandez, J. M.; Evans, D.; Foulkes, S.

    2012-01-01

    Commodity hardware is going many-core. We might soon not be able to satisfy the job memory needs per core in the current single-core processing model in High Energy Physics. In addition, an ever increasing number of independent and incoherent jobs running on the same physical hardware not sharing resources might significantly affect processing performance. It will be essential to effectively utilize the multi-core architecture. CMS has incorporated support for multi-core processing in the event processing framework and the workload management system. Multi-core processing jobs share common data in memory, such us the code libraries, detector geometry and conditions data, resultingmore » in a much lower memory usage than standard single-core independent jobs. Exploiting this new processing model requires a new model in computing resource allocation, departing from the standard single-core allocation for a job. The experiment job management system needs to have control over a larger quantum of resource since multi-core aware jobs require the scheduling of multiples cores simultaneously. CMS is exploring the approach of using whole nodes as unit in the workload management system where all cores of a node are allocated to a multi-core job. Whole-node scheduling allows for optimization of the data/workflow management (e.g. I/O caching, local merging) but efficient utilization of all scheduled cores is challenging. Dedicated whole-node queues have been setup at all Tier-1 centers for exploring multi-core processing workflows in CMS. We present the evaluation of the performance scheduling and executing multi-core workflows in whole-node queues compared to the standard single-core processing workflows.« less

  17. Multi-core processing and scheduling performance in CMS

    NASA Astrophysics Data System (ADS)

    Hernández, J. M.; Evans, D.; Foulkes, S.

    2012-12-01

    Commodity hardware is going many-core. We might soon not be able to satisfy the job memory needs per core in the current single-core processing model in High Energy Physics. In addition, an ever increasing number of independent and incoherent jobs running on the same physical hardware not sharing resources might significantly affect processing performance. It will be essential to effectively utilize the multi-core architecture. CMS has incorporated support for multi-core processing in the event processing framework and the workload management system. Multi-core processing jobs share common data in memory, such us the code libraries, detector geometry and conditions data, resulting in a much lower memory usage than standard single-core independent jobs. Exploiting this new processing model requires a new model in computing resource allocation, departing from the standard single-core allocation for a job. The experiment job management system needs to have control over a larger quantum of resource since multi-core aware jobs require the scheduling of multiples cores simultaneously. CMS is exploring the approach of using whole nodes as unit in the workload management system where all cores of a node are allocated to a multi-core job. Whole-node scheduling allows for optimization of the data/workflow management (e.g. I/O caching, local merging) but efficient utilization of all scheduled cores is challenging. Dedicated whole-node queues have been setup at all Tier-1 centers for exploring multi-core processing workflows in CMS. We present the evaluation of the performance scheduling and executing multi-core workflows in whole-node queues compared to the standard single-core processing workflows.

  18. AUTOMOTIVE REPAIR SHOP, INTERIOR VIEW TO SOUTHEAST, DOORWAYS TO SHOP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    AUTOMOTIVE REPAIR SHOP, INTERIOR VIEW TO SOUTHEAST, DOORWAYS TO SHOP OFFICE AND SOUTH WING. - Cedar City Automotive Repair Shop, Automotive Repair Shop, 820 North Main Street, Cedar City, Iron County, UT

  19. Thread scheduling for GPU-based OPC simulation on multi-thread

    NASA Astrophysics Data System (ADS)

    Lee, Heejun; Kim, Sangwook; Hong, Jisuk; Lee, Sooryong; Han, Hwansoo

    2018-03-01

    As semiconductor product development based on shrinkage continues, the accuracy and difficulty required for the model based optical proximity correction (MBOPC) is increasing. OPC simulation time, which is the most timeconsuming part of MBOPC, is rapidly increasing due to high pattern density in a layout and complex OPC model. To reduce OPC simulation time, we attempt to apply graphic processing unit (GPU) to MBOPC because OPC process is good to be programmed in parallel. We address some issues that may typically happen during GPU-based OPC simulation in multi thread system, such as "out of memory" and "GPU idle time". To overcome these problems, we propose a thread scheduling method, which manages OPC jobs in multiple threads in such a way that simulations jobs from multiple threads are alternatively executed on GPU while correction jobs are executed at the same time in each CPU cores. It was observed that the amount of GPU peak memory usage decreases by up to 35%, and MBOPC runtime also decreases by 4%. In cases where out of memory issues occur in a multi-threaded environment, the thread scheduler was used to improve MBOPC runtime up to 23%.

  20. AUTOMOTIVE REPAIR SHOP, INTERIOR VIEW TO SOUTHEAST, DOORWAYS TO SHOP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    AUTOMOTIVE REPAIR SHOP, INTERIOR VIEW TO SOUTHEAST, DOORWAYS TO SHOP OFFICE AND SOUTH WING, WITH SCALE. - Cedar City Automotive Repair Shop, Automotive Repair Shop, 820 North Main Street, Cedar City, Iron County, UT

  1. An FMS Dynamic Production Scheduling Algorithm Considering Cutting Tool Failure and Cutting Tool Life

    NASA Astrophysics Data System (ADS)

    Setiawan, A.; Wangsaputra, R.; Martawirya, Y. Y.; Halim, A. H.

    2016-02-01

    This paper deals with Flexible Manufacturing System (FMS) production rescheduling due to unavailability of cutting tools caused either of cutting tool failure or life time limit. The FMS consists of parallel identical machines integrated with an automatic material handling system and it runs fully automatically. Each machine has a same cutting tool configuration that consists of different geometrical cutting tool types on each tool magazine. The job usually takes two stages. Each stage has sequential operations allocated to machines considering the cutting tool life. In the real situation, the cutting tool can fail before the cutting tool life is reached. The objective in this paper is to develop a dynamic scheduling algorithm when a cutting tool is broken during unmanned and a rescheduling needed. The algorithm consists of four steps. The first step is generating initial schedule, the second step is determination the cutting tool failure time, the third step is determination of system status at cutting tool failure time and the fourth step is the rescheduling for unfinished jobs. The approaches to solve the problem are complete-reactive scheduling and robust-proactive scheduling. The new schedules result differences starting time and completion time of each operations from the initial schedule.

  2. Genotoxic damage in auto body shop workers.

    PubMed

    Siebel, Anna Maria; Basso da Silva, Luciano

    2010-10-01

    Some studies have shown increased DNA damage among car painters, but other professionals working in auto body and paint shops have not been extensively assessed. The aim of this study was to assess DNA damage in different types of auto body shop workers by measuring micronucleus (MN) levels in exfoliated buccal cells. The mean number of cells with MN per 2000 exfoliated buccal cells was analyzed in three groups of male workers: auto body repair technicians, painters, and office workers (control group). All participants answered a questionnaire inquiring about age, smoking habits, alcohol consumption, work practices, occupational exposure time, job activities, and use of protective equipment. The mean number of cells with MN was 3.50 ± 1.50 in auto body painters, 3.91 ± 2.10 in auto body repair technicians, and 0.80 ± 0.78 in office workers, with a significant difference between the control group and the two other groups (p = 0.0001). Age, occupational exposure time, use of protective masks, alcohol consumption, and smoking habit did not affect MN results. The findings indicate that technicians and painters working in auto body shops are at risk for genotoxic damage, while office workers seem to be protected.

  3. Job Design and Ethnic Differences in Working Women’s Physical Activity

    PubMed Central

    Grzywacz, Joseph G.; Crain, A. Lauren; Martinson, Brian C.; Quandt, Sara A.

    2014-01-01

    Objective To document the role job control and schedule control play in shaping women’s physical activity, and how it delineates educational and racial variability in associations of job and social control with physical activity. Methods Prospective data were obtained from a community-based sample of working women (N = 302). Validated instruments measured job control and schedule control. Steps per day were assessed using New Lifestyles 800 activity monitors. Results Greater job control predicted more steps per day, whereas greater schedule control predicted fewer steps. Small indirect associations between ethnicity and physical activity were observed among women with a trade school degree or less but not for women with a college degree. Conclusions Low job control created barriers to physical activity among working women with a trade school degree or less. Greater schedule control predicted less physical activity, suggesting women do not use time “created” by schedule flexibility for personal health enhancement. PMID:24034681

  4. Decentralized Control of Scheduling in Distributed Systems.

    DTIC Science & Technology

    1983-03-18

    the job scheduling algorithm adapts to the changing busyness of the various hosts in the system. The environment in which the job scheduling entities...resources and processes that constitute the node and a set of interfaces for accessing these processes and resources. The structure of a node could change ...parallel. Chang [CHNG82] has also described some algorithms for detecting properties of general graphs by traversing paths in a graph in parallel. One of

  5. MaGate Simulator: A Simulation Environment for a Decentralized Grid Scheduler

    NASA Astrophysics Data System (ADS)

    Huang, Ye; Brocco, Amos; Courant, Michele; Hirsbrunner, Beat; Kuonen, Pierre

    This paper presents a simulator for of a decentralized modular grid scheduler named MaGate. MaGate’s design emphasizes scheduler interoperability by providing intelligent scheduling serving the grid community as a whole. Each MaGate scheduler instance is able to deal with dynamic scheduling conditions, with continuously arriving grid jobs. Received jobs are either allocated on local resources, or delegated to other MaGates for remote execution. The proposed MaGate simulator is based on GridSim toolkit and Alea simulator, and abstracts the features and behaviors of complex fundamental grid elements, such as grid jobs, grid resources, and grid users. Simulation of scheduling tasks is supported by a grid network overlay simulator executing distributed ant-based swarm intelligence algorithms to provide services such as group communication and resource discovery. For evaluation, a comparison of behaviors of different collaborative policies among a community of MaGates is provided. Results support the use of the proposed approach as a functional ready grid scheduler simulator.

  6. 117. ARAI Shop and maintenance (ARA627) building roof and floor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    117. ARA-I Shop and maintenance (ARA-627) building roof and floor plan. Includes room finish and equipment schedule. Norman Engineering Company 961-area/SF-627-A-1. Date: January 1959. Ineel index code no. 068-0627-00-613-102759. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  7. Performance of Quantum Annealers on Hard Scheduling Problems

    NASA Astrophysics Data System (ADS)

    Pokharel, Bibek; Venturelli, Davide; Rieffel, Eleanor

    Quantum annealers have been employed to attack a variety of optimization problems. We compared the performance of the current D-Wave 2X quantum annealer to that of the previous generation D-Wave Two quantum annealer on scheduling-type planning problems. Further, we compared the effect of different anneal times, embeddings of the logical problem, and different settings of the ferromagnetic coupling JF across the logical vertex-model on the performance of the D-Wave 2X quantum annealer. Our results show that at the best settings, the scaling of expected anneal time to solution for D-WAVE 2X is better than that of the DWave Two, but still inferior to that of state of the art classical solvers on these problems. We discuss the implication of our results for the design and programming of future quantum annealers. Supported by NASA Ames Research Center.

  8. A Hybrid Cellular Genetic Algorithm for Multi-objective Crew Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Jolai, Fariborz; Assadipour, Ghazal

    Crew scheduling is one of the important problems of the airline industry. This problem aims to cover a number of flights by crew members, such that all the flights are covered. In a robust scheduling the assignment should be so that the total cost, delays, and unbalanced utilization are minimized. As the problem is NP-hard and the objectives are in conflict with each other, a multi-objective meta-heuristic called CellDE, which is a hybrid cellular genetic algorithm, is implemented as the optimization method. The proposed algorithm provides the decision maker with a set of non-dominated or Pareto-optimal solutions, and enables them to choose the best one according to their preferences. A set of problems of different sizes is generated and solved using the proposed algorithm. Evaluating the performance of the proposed algorithm, three metrics are suggested, and the diversity and the convergence of the achieved Pareto front are appraised. Finally a comparison is made between CellDE and PAES, another meta-heuristic algorithm. The results show the superiority of CellDE.

  9. A DAG Scheduling Scheme on Heterogeneous Computing Systems Using Tuple-Based Chemical Reaction Optimization

    PubMed Central

    Jiang, Yuyi; Shao, Zhiqing; Guo, Yi

    2014-01-01

    A complex computing problem can be solved efficiently on a system with multiple computing nodes by dividing its implementation code into several parallel processing modules or tasks that can be formulated as directed acyclic graph (DAG) problems. The DAG jobs may be mapped to and scheduled on the computing nodes to minimize the total execution time. Searching an optimal DAG scheduling solution is considered to be NP-complete. This paper proposed a tuple molecular structure-based chemical reaction optimization (TMSCRO) method for DAG scheduling on heterogeneous computing systems, based on a very recently proposed metaheuristic method, chemical reaction optimization (CRO). Comparing with other CRO-based algorithms for DAG scheduling, the design of tuple reaction molecular structure and four elementary reaction operators of TMSCRO is more reasonable. TMSCRO also applies the concept of constrained critical paths (CCPs), constrained-critical-path directed acyclic graph (CCPDAG) and super molecule for accelerating convergence. In this paper, we have also conducted simulation experiments to verify the effectiveness and efficiency of TMSCRO upon a large set of randomly generated graphs and the graphs for real world problems. PMID:25143977

  10. A DAG scheduling scheme on heterogeneous computing systems using tuple-based chemical reaction optimization.

    PubMed

    Jiang, Yuyi; Shao, Zhiqing; Guo, Yi

    2014-01-01

    A complex computing problem can be solved efficiently on a system with multiple computing nodes by dividing its implementation code into several parallel processing modules or tasks that can be formulated as directed acyclic graph (DAG) problems. The DAG jobs may be mapped to and scheduled on the computing nodes to minimize the total execution time. Searching an optimal DAG scheduling solution is considered to be NP-complete. This paper proposed a tuple molecular structure-based chemical reaction optimization (TMSCRO) method for DAG scheduling on heterogeneous computing systems, based on a very recently proposed metaheuristic method, chemical reaction optimization (CRO). Comparing with other CRO-based algorithms for DAG scheduling, the design of tuple reaction molecular structure and four elementary reaction operators of TMSCRO is more reasonable. TMSCRO also applies the concept of constrained critical paths (CCPs), constrained-critical-path directed acyclic graph (CCPDAG) and super molecule for accelerating convergence. In this paper, we have also conducted simulation experiments to verify the effectiveness and efficiency of TMSCRO upon a large set of randomly generated graphs and the graphs for real world problems.

  11. The Costs of Today's Jobs: Job Characteristics and Organizational Supports as Antecedents of Negative Spillover

    ERIC Educational Resources Information Center

    Grotto, Angela R.; Lyness, Karen S.

    2010-01-01

    This study examined job characteristics and organizational supports as antecedents of negative work-to-nonwork spillover for 1178 U.S. employees. Based on hierarchical regression analyses of 2002 National Study of the Changing Workforce data and O*NET data, job demands (requirements to work at home beyond scheduled hours, job complexity, time and…

  12. Rethinking the Clockwork of Work: Why Schedule Control May Pay Off at Work and at Home

    PubMed Central

    Kelly, Erin L.; Moen, Phyllis

    2014-01-01

    The problem and the solution Many employees face work–life conflicts and time deficits that negatively affect their health, well-being, effectiveness on the job, and organizational commitment. Many organizations have adopted flexible work arrangements but not all of them increase schedule control, that is, employees’ control over when, where, and how much they work. This article describes some limitations of flexible work policies, proposes a conceptual model of how schedule control impacts work–life conflicts, and describes specific ways to increase employees’ schedule control, including best practices for implementing common flexible work policies and Best Buy’s innovative approach to creating a culture of schedule control. PMID:25598711

  13. An engine awaits processing in the new engine shop at KSC

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Space Shuttle Main Engine Processing Facility (SSMEPF), a new Block 2A engine sits on the workstand as technicians process it. The engine is scheduled to fly on the Space Shuttle Endeavour during the STS-88 mission in December 1998. The SSMEPF officially opened on July 6, replacing the Shuttle Main Engine Shop.

  14. At-risk/problematic shopping and gambling in adolescence

    PubMed Central

    Pilver, Corey E.; Steinberg, Marvin A.; Rugle, Loreen J.; Krishnan-Sarin, Suchitra; Hoff, Rani A.; Potenza, Marc N.

    2016-01-01

    Elevated levels of both pathological gambling (PG) and problem shopping (PS) have been reported among adolescents, and each is associated with a range of other negative health/functioning measures. However, relationships between PS and PG, particularly during adolescence, are not well understood. In this study, we explored the relationship between different levels of problem-gambling severity and health/functioning characteristics, gambling-related social experiences, gambling behaviors and motivations among adolescents with and without at-risk/problematic shopping (ARPS). Survey data from Connecticut high school students (n=2,100) were analyzed using bivariate analyses and logistic regression modeling. Although at-risk/problematic gambling (ARPG) was not increased among adolescents with ARPS, adolescents with ARPG (versus non-gamblers) were more likely to report having experienced a growing tension or anxiety that could only be relieved by shopping and missing other obligations due to shopping. In comparison to the non-ARPS group, a smaller proportion of respondents in the ARPS group reported paid part-time employment, whereas a greater proportion of respondents reported excessive gambling by peers and feeling concerned over the gambling of a close family member. In general, similar associations between problem-gambling severity and measures of health/functioning and gambling-related behaviors and motivations were observed across ARPS and non-ARPS adolescents. However, associations were weaker among ARPS adolescents for several variables: engagement in extracurricular activities, alcohol and caffeine use and gambling for financial reasons. These findings suggest a complex relationship between problem-gambling severity and ARPS. They highlight the importance of considering co-occurring risk behaviors such as ARPS when treating adolescents with at-risk/problem gambling. PMID:25117852

  15. At-Risk/Problematic Shopping and Gambling in Adolescence.

    PubMed

    Yip, Sarah W; Mei, Songli; Pilver, Corey E; Steinberg, Marvin A; Rugle, Loreen J; Krishnan-Sarin, Suchitra; Hoff, Rani A; Potenza, Marc N

    2015-12-01

    Elevated levels of both pathological gambling (PG) and problem shopping (PS) have been reported among adolescents, and each is associated with a range of other negative health/functioning measures. However, relationships between PS and PG, particularly during adolescence, are not well understood. In this study, we explored the relationship between different levels of problem-gambling severity and health/functioning characteristics, gambling-related social experiences, gambling behaviors and motivations among adolescents with and without at-risk/problematic shopping (ARPS). Survey data from Connecticut high school students (n = 2,100) were analyzed using bivariate analyses and logistic regression modeling. Although at-risk/problematic gambling (ARPG) was not increased among adolescents with ARPS, adolescents with ARPG (vs non-gamblers) were more likely to report having experienced a growing tension or anxiety that could only be relieved by shopping and missing other obligations due to shopping. In comparison to the non-ARPS group, a smaller proportion of respondents in the ARPS group reported paid part-time employment, whereas a greater proportion of respondents reported excessive gambling by peers and feeling concerned over the gambling of a close family member. In general, similar associations between problem-gambling severity and measures of health/functioning and gambling-related behaviors and motivations were observed across ARPS and non-ARPS adolescents. However, associations were weaker among ARPS adolescents for several variables: engagement in extracurricular activities, alcohol and caffeine use and gambling for financial reasons. These findings suggest a complex relationship between problem-gambling severity and ARPS. They highlight the importance of considering co-occurring risk behaviors such as ARPS when treating adolescents with at-risk/problem gambling.

  16. Diisocyanate-exposed auto body shop workers: a one-year follow-up.

    PubMed

    Redlich, C A; Stowe, M H; Coren, B A; Wisnewski, A V; Holm, C T; Cullen, M R

    2002-12-01

    Diisocyanates currently are the most commonly identified cause of occupational asthma in industrialized countries. Auto body shops, a common hexamethylene diisocyanate (HDI) exposure setting, are difficult to study due to their small size and episodic exposures. A 1-year follow-up was undertaken as an adjunct to the cross-sectional SPRAY study (Survey of Painters & Repairers of Auto bodies by Yale) to investigate the effects of HDI on auto body shop workers over time and whether or not the healthy worker effect may exist in this industry. Forty-eight workers from seven shops were re-contacted. Thirty-four subjects who stayed at the same shop and 11 who left their original shop participated. No statistically significant changes in physiology, symptoms, and immunologic responses from baseline to follow-up were noted. However, significant differences between those who left the shops and those who stayed were noted. Those who left were younger, less experienced in the industry, and more likely to have a history of asthma (23 vs. 3%; P < 0.05), bronchial hyper-responsiveness (23 vs. 9%), HDI-specific IgG (64 vs. 29%; P < 0.05), and HDI-specific proliferation (S.I. 2.0 vs. 1.3; P < 0.05). The differences in workers who stayed at their shop compared to those who left, combined with the low asthma prevalence and high job turnover rate, all suggest that a healthy worker effect may exist in the auto body industry, and may in part account for the low prevalence of asthma noted in SPRAY and other cross-sectional studies of diisocyante workers. Copyright 2002 Wiley-Liss, Inc.

  17. Injuries sustained by students in shop class.

    PubMed

    Knight, S; Junkins, E P; Lightfoot, A C; Cazier, C F; Olson, L M

    2000-07-01

    Injuries in the school environment are a serious public health problem. Injuries occurring within the school shop class are a part of this problem that has received little to no attention. The purpose of our study was to describe the epidemiology of shop class injuries in Utah public schools for the years 1992-1996. Utah statewide grades 7 through 12 school injury data for 1992-1996 were used. The data were generated from a standardized Student Injury Report form completed by school personnel immediately after the occurrence of an injury on school premises that: 1) caused loss of at least one half of a day of school; and/or 2) warranted medical attention and treatment. Shop injuries were defined as injuries that occurred in industrial art classes, vocational educational classes, or automotive classes. To determine the medical outcome and hospital charges associated with shop class injuries, we linked the Student Injury Report database to Utah statewide emergency department (ED) records (available for 1996 only), and to Utah statewide hospital inpatient discharge records (1992-1996). During 1992-1996, 14 133 students in grades 7 through 12 were injured at school, of which 1008 (7.1%) were injured during a shop class. The majority (88. 4%) of shop injuries involved equipment use. Equipment was misused in 37.9% and malfunctioned in 3.5% of the incidents. The leading injuries reported for shop equipment were lacerations (70.9%), burns (6.0%), and abrasions (4.6%), whereas the leading for nonequipment injuries were lacerations (45.4%), fractures (9.2%), and pain/tenderness (6.7%). In 1996, 167 students were injured in a shop class and 45 (26.9%) visited an ED as a result of the shop injury. Equipment was a factor in 88.9% of the shop injuries admitted to the ED. Table saws (15.0%), other saws (15.0%), and band saws (12.5%) were involved in nearly one half of the equipment injuries. Equipment was misused in 44.7% and malfunctioned in 10.5% of the incidents resulting in

  18. 15. Interior, Machine Shop, Roundhouse Machine Shop Extension, Southern Pacific ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Interior, Machine Shop, Roundhouse Machine Shop Extension, Southern Pacific Railroad Carlin Shops, view to northeast (90mm lens). The arched cutouts in the bottom chords of the roof trusses were necessary to provide clearance for the smokestacks of steam locomotives, and also mark the location of the former inspection pit in the floor (now filled in and covered by a new concrete floor). - Southern Pacific Railroad, Carlin Shops, Roundhouse Machine Shop Extension, Foot of Sixth Street, Carlin, Elko County, NV

  19. 20. MACHINE SHOP, LOOKING SOUTH. SHOP IS EQUIPPED WITH A ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. MACHINE SHOP, LOOKING SOUTH. SHOP IS EQUIPPED WITH A 25-TON SHAW CRANE TO HANDLE PARTS FROM RAIL CARS INTO THE SHOP. MACHINE SHOP HANDLES ALL NECESSARY REPAIR WORK ON THE DOCK MACHINERY. - Pennsylvania Railway Ore Dock, Lake Erie at Whiskey Island, approximately 1.5 miles west of Public Square, Cleveland, Cuyahoga County, OH

  20. An engine awaits processing in the new engine shop at KSC

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Space Shuttle Main Engine Processing Facility (SSMEPF), a new Block 2A engine sits on the transport cradle before being moved to the workstand. The engine is scheduled to fly on the Space Shuttle Endeavour during the STS-88 mission in December 1998. The SSMEPF officially opened on July 6, replacing the Shuttle Main Engine Shop.

  1. Minimizing conflicts: A heuristic repair method for constraint-satisfaction and scheduling problems

    NASA Technical Reports Server (NTRS)

    Minton, Steve; Johnston, Mark; Philips, Andrew; Laird, Phil

    1992-01-01

    This paper describes a simple heuristic approach to solving large-scale constraint satisfaction and scheduling problems. In this approach one starts with an inconsistent assignment for a set of variables and searches through the space of possible repairs. The search can be guided by a value-ordering heuristic, the min-conflicts heuristic, that attempts to minimize the number of constraint violations after each step. The heuristic can be used with a variety of different search strategies. We demonstrate empirically that on the n-queens problem, a technique based on this approach performs orders of magnitude better than traditional backtracking techniques. We also describe a scheduling application where the approach has been used successfully. A theoretical analysis is presented both to explain why this method works well on certain types of problems and to predict when it is likely to be most effective.

  2. 20 CFR 628.420 - Job training plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Job training plan. 628.420 Section 628.420... THE JOB TRAINING PARTNERSHIP ACT Local Service Delivery System § 628.420 Job training plan. (a) The Governor shall issue instructions and schedules to assure that job training plans and plan modifications...

  3. 20 CFR 628.420 - Job training plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Job training plan. 628.420 Section 628.420... THE JOB TRAINING PARTNERSHIP ACT Local Service Delivery System § 628.420 Job training plan. (a) The Governor shall issue instructions and schedules to assure that job training plans and plan modifications...

  4. 20 CFR 628.420 - Job training plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Job training plan. 628.420 Section 628.420... THE JOB TRAINING PARTNERSHIP ACT Local Service Delivery System § 628.420 Job training plan. (a) The Governor shall issue instructions and schedules to assure that job training plans and plan modifications...

  5. Coping in the World of Work. Practice in Problem Solving. Presentation Scripts. Filmstrip No. 1: Problems on the Job; and Filmstrip No. 2: Work Entry and Job Adjustment Problems.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Center for Vocational Education.

    Presentation scripts for two sound filmstrips are contained in this document, which accompanies a career development unit on coping in the world of work designed to assist students in developing coping strategies to deal with work entry and job adjustment problems. (Other components of the unit--instructor's handbook, student guide, and…

  6. Differential Validities for Shop Courses: Proposal B: Follow-Up of Subjects' Work Experiences. Final Report. Vol I: Procedures and Results.

    ERIC Educational Resources Information Center

    Isabelle, L. A.; Lokan, J. J.

    Follow-up information was collected on 1500 students who attended a two-year occupational high school, in order to relate predictor measures to success during training and subsequent job success. Although not predictive of dropouts, variables in the pre-test battery did predict performance in academic and shop courses; ratings of job success were…

  7. Shopping for a safer car

    DOT National Transportation Integrated Search

    2010-01-01

    This brochure provides some helpful tips on what to look for when shopping for a safer car. Automakers are increasingly advertising the safety features of their cars. The problem is sorting out their claims and zeroing in on the safety features that ...

  8. Job Demand in the Cosmetology Industry.

    ERIC Educational Resources Information Center

    Rudner, Lawrence M.; Deutermann, William V., Jr.

    In order to determine job demand in the cosmetology industry, a survey was made of a nationally representative stratified random sample of 1,454 beauty salons, barber shops, and unisex salons in July 1991. Salon owners were asked about 1990 and their plans for the future. Survey results were supplemented with information about the industry…

  9. Effects of a Photo Activity Schedule Book on Independent Task Changes by Students with Intellectual Disabilities in Community and School Job Sites

    ERIC Educational Resources Information Center

    Carson, Keyla D; Gast, David L.; Ayres, Kevin M.

    2008-01-01

    The purpose of this study was to evaluate the effectiveness of using a photo activity schedule book to increase independent transitioning between vocational tasks inside a school cafeteria and at a community job site. Three students with mild to moderate intellectual disabilities, enrolled in a self-contained classroom in a public high school,…

  10. Significant Tasks in Training of Job-Shop Supervisors

    ERIC Educational Resources Information Center

    Pederson, Leonard S.; Dresdow, Sally; Benson, Joy

    2013-01-01

    Purpose: The need for effective training of first-line supervisors is well established. Well-trained supervision is essential to our future as a country. A fundamental step in developing effective training is to develop a jobs needs assessment. In order to develop an effective needs assessment, it is necessary to know what the tasks are of…

  11. A short-term operating room surgery scheduling problem integrating multiple nurses roster constraints.

    PubMed

    Xiang, Wei; Yin, Jiao; Lim, Gino

    2015-02-01

    Operating room (OR) surgery scheduling determines the individual surgery's operation start time and assigns the required resources to each surgery over a schedule period, considering several constraints related to a complete surgery flow and the multiple resources involved. This task plays a decisive role in providing timely treatments for the patients while balancing hospital resource utilization. The originality of the present study is to integrate the surgery scheduling problem with real-life nurse roster constraints such as their role, specialty, qualification and availability. This article proposes a mathematical model and an ant colony optimization (ACO) approach to efficiently solve such surgery scheduling problems. A modified ACO algorithm with a two-level ant graph model is developed to solve such combinatorial optimization problems because of its computational complexity. The outer ant graph represents surgeries, while the inner graph is a dynamic resource graph. Three types of pheromones, i.e. sequence-related, surgery-related, and resource-related pheromone, fitting for a two-level model are defined. The iteration-best and feasible update strategy and local pheromone update rules are adopted to emphasize the information related to the good solution in makespan, and the balanced utilization of resources as well. The performance of the proposed ACO algorithm is then evaluated using the test cases from (1) the published literature data with complete nurse roster constraints, and 2) the real data collected from a hospital in China. The scheduling results using the proposed ACO approach are compared with the test case from both the literature and the real life hospital scheduling. Comparison results with the literature shows that the proposed ACO approach has (1) an 1.5-h reduction in end time; (2) a reduction in variation of resources' working time, i.e. 25% for ORs, 50% for nurses in shift 1 and 86% for nurses in shift 2; (3) an 0.25h reduction in

  12. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  13. RIGGERS LOFT/PAINT SHOP/SHEET METAL SHOP, VIEW TO SOUTHEAST. THE PAINT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    RIGGERS LOFT/PAINT SHOP/SHEET METAL SHOP, VIEW TO SOUTHEAST. THE PAINT SHOP WAS LOCATED IN THE CLOSEST CORNER OF THE BUILDING. THE SHEET METAL SHOP WAS LOCATED IN THE CORNER OF THE BUILDING ON THE RIGHT. THE RIGGERS LOFT WAS LOCATED IN THE PORTION OF THE BUILDING OUT OF VIEW TO THE LEFT - Rosie the Riveter National Historical Park, Riggers Loft/Paint Shop/Sheet Metal Shop, 1322 Canal Boulevard, Richmond, Contra Costa County, CA

  14. TEAM (Technologies Enabling Agile Manufacturing) shop floor control requirements guide: Version 1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-03-28

    TEAM will create a shop floor control system (SFC) to link the pre-production planning to shop floor execution. SFC must meet the requirements of a multi-facility corporation, where control must be maintained between co-located facilities down to individual workstations within each facility. SFC must also meet the requirements of a small corporation, where there may only be one small facility. A hierarchical architecture is required to meet these diverse needs. The hierarchy contains the following levels: Enterprise, Factory, Cell, Station, and Equipment. SFC is focused on the top three levels. Each level of the hierarchy is divided into three basicmore » functions: Scheduler, Dispatcher, and Monitor. The requirements of each function depend on the hierarchical level in which it is to be used. For example, the scheduler at the Enterprise level must allocate production to individual factories and assign due-dates; the scheduler at the Cell level must provide detailed start and stop times of individual operations. Finally the system shall have the following features: distributed and open-architecture. Open architecture software is required in order that the appropriate technology be used at each level of the SFC hierarchy, and even at different instances within the same hierarchical level (for example, Factory A uses discrete-event simulation scheduling software, and Factory B uses an optimization-based scheduler). A distributed implementation is required to reduce the computational burden of the overall system, and allow for localized control. A distributed, open-architecture implementation will also require standards for communication between hierarchical levels.« less

  15. Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm

    NASA Astrophysics Data System (ADS)

    Ausaf, Muhammad Farhan; Gao, Liang; Li, Xinyu

    2015-12-01

    For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.

  16. What work schedule characteristics constitute a problem to the individual? A representative study of Swedish shift workers.

    PubMed

    Åkerstedt, Torbjörn; Kecklund, Göran

    2017-03-01

    The purpose was to investigate which detailed characteristics of shift schedules that are seen as problems to those exposed. A representative national sample of non-day workers (N = 2031) in Sweden was asked whether they had each of a number of particular work schedule characteristics and, if yes, to what extent this constituted a "big problem in life". It was also inquired whether the individual's work schedules had negative consequences for fatigue, sleep and social life. The characteristic with the highest percentage reporting a big problem was "short notice (<1 month) of a new work schedule" (30.5%), <11 h off between shifts (27.8%), and split duty (>1.5 h break at mid-shift, 27.2%). Overtime (>10 h/week), night work, morning work, day/night shifts showed lower prevalences of being a "big problem". Women indicated more problems in general. Short notice was mainly related to negative social effects, while <11 h off between shifts was related to disturbed sleep, fatigue and social difficulties. It was concluded that schedules involving unpredictable working hours (short notice), short daily rest between shifts, and split duty shifts constitute big problems. The results challenge current views of what aspects of shift work need improvement, and negative social consequences seem more important than those related to health. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Flexible Work Schedules. ERIC Digest.

    ERIC Educational Resources Information Center

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  18. Nonstandard maternal work schedules during infancy: Implications for children's early behavior problems

    PubMed Central

    Daniel, Stephanie S.; Grzywacz, Joseph G.; Leerkes, Esther; Tucker, Jenna; Han, Wen-Jui

    2009-01-01

    This paper examines the associations between maternal nonstandard work schedules during infancy and children's early behavior problems, and the extent to which infant temperament may moderate these associations. Hypothesized associations were tested using data from the National Institute of Child Health and Human Development (NICHD) Study of Early Child Care (Phase I). Analyses focused on mothers who returned to work by the time the child was 6 months of age, and who worked an average of at least 35 h per week from 6 through 36 months. At 24 and 36 months, children whose mothers worked a nonstandard schedule had higher internalizing and externalizing behaviors. Modest, albeit inconsistent, evidence suggests that temperamentally reactive children may be more vulnerable to maternal work schedules. Maternal depressive symptoms partially mediated associations between nonstandard maternal work schedules and child behavior outcomes. PMID:19233479

  19. The MICRO-BOSS scheduling system: Current status and future efforts

    NASA Technical Reports Server (NTRS)

    Sadeh, Norman M.

    1992-01-01

    In this paper, a micro-opportunistic approach to factory scheduling was described that closely monitors the evolution of bottlenecks during the construction of the schedule and continuously redirects search towards the bottleneck that appears to be most critical. This approach differs from earlier opportunistic approaches, as it does not require scheduling large resource subproblems or large job subproblems before revising the current scheduling strategy. This micro-opportunistic approach was implemented in the context of the MICRO-BOSS factory scheduling system. A study comparing MICRO-BOSS against a macro-opportunistic scheduler suggests that the additional flexibility of the micro-opportunistic approach to scheduling generally yields important reductions in both tardiness and inventory. Current research efforts include: adaptation of MICRO-BOSS to deal with sequence-dependent setups and development of micro-opportunistic reactive scheduling techniques that will enable the system to patch the schedule in the presence of contingencies such as machine breakdowns, raw materials arriving late, job cancellations, etc.

  20. 6. NORTH END OF MACHINE SHOP. FORGE SHOP (HAER No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. NORTH END OF MACHINE SHOP. FORGE SHOP (HAER No. CA-326-K) ON LEFT, FORD PLANT IN DISTANCE, NE BY 60. - Rosie the Riveter National Historical Park, Machine Shop, 1311 Canal Boulevard, Richmond, Contra Costa County, CA

  1. A multiprocessor computer simulation model employing a feedback scheduler/allocator for memory space and bandwidth matching and TMR processing

    NASA Technical Reports Server (NTRS)

    Bradley, D. B.; Irwin, J. D.

    1974-01-01

    A computer simulation model for a multiprocessor computer is developed that is useful for studying the problem of matching multiprocessor's memory space, memory bandwidth and numbers and speeds of processors with aggregate job set characteristics. The model assumes an input work load of a set of recurrent jobs. The model includes a feedback scheduler/allocator which attempts to improve system performance through higher memory bandwidth utilization by matching individual job requirements for space and bandwidth with space availability and estimates of bandwidth availability at the times of memory allocation. The simulation model includes provisions for specifying precedence relations among the jobs in a job set, and provisions for specifying precedence execution of TMR (Triple Modular Redundant and SIMPLEX (non redundant) jobs.

  2. Overall interior view of structures shop (11 shop) located on ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overall interior view of structures shop (11 shop) located on west side of building 57 - looking north; the south end of the structures shop was devoted to welding heavy plate foundations and ship components; the floor is fabricated of case steel and features a grillwork of 1 1/2 fabricated holes which are used as sockets for gripping position pins. - Naval Base Philadelphia-Philadelphia Naval Shipyard, Structure Shop, League Island, Philadelphia, Philadelphia County, PA

  3. Learn & Shop: Teaching Composition in Shopping Centers.

    ERIC Educational Resources Information Center

    East, James R.; Strahl, Ronald

    1982-01-01

    Describes a learn and shop program conducted by Indiana University-Purdue University at Indianapolis in various shopping malls around the city. Discusses how the atmosphere of composition courses held off campus influences students' attitudes toward writing and college-level work. (HTH)

  4. Structuring On-the-Job Training.

    ERIC Educational Resources Information Center

    DeJong, J. A.; Versloot, A. M.

    A study examined on-the-job training (OJT) at 8 Dutch firms employing more than 500 individuals each. A case study approach was used to investigate the following: job characteristics, program history, training schedules, training process, training materials, interaction with production, trainee characteristics, trainer characteristics, social…

  5. General view along tracks to Locomotive Shop with Car Shop ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    General view along tracks to Locomotive Shop with Car Shop on right. Note locomotive tires leaning against Car Shop wall. View from west - East Broad Top Railroad & Coal Company, State Route 994, West of U.S. Route 522, Rockhill Furnace, Huntingdon County, PA

  6. Doctor Shopping

    PubMed Central

    Sansone, Lori A.

    2012-01-01

    Doctor shopping is defined as seeing multiple treatment providers, either during a single illness episode or to procure prescription medications illicitly. According to the available literature, prevalence rates of doctor shopping vary widely, from 6.3 to 56 percent. However, this variability is partially attributable to research methodology, including the study definition of doctor shopping as well as the patient sample. The reasons for doctor shopping are varied. Some patient explanations for this phenomenon relate to clinician factors, such as inconvenient office hours or locations, long waiting times, personal characteristics or qualities of the provider, and/or insufficient communication time between the patient and clinician. Some patient explanations relate to personal factors and include both illness factors (e.g., symptom persistence, lack of understanding or nonacceptance of the diagnosis or treatment) as well as psychological factors (e.g., somatization, prescription drug-seeking). Importantly, not all doctor shopping is driven by suspect motivations. Being aware of these various patient justifications for doctor shopping is important in understanding and managing these challenging patients in the clinical setting, whether they emerge in psychiatric or primary care environments. PMID:23346518

  7. Estimates of the absolute error and a scheme for an approximate solution to scheduling problems

    NASA Astrophysics Data System (ADS)

    Lazarev, A. A.

    2009-02-01

    An approach is proposed for estimating absolute errors and finding approximate solutions to classical NP-hard scheduling problems of minimizing the maximum lateness for one or many machines and makespan is minimized. The concept of a metric (distance) between instances of the problem is introduced. The idea behind the approach is, given the problem instance, to construct another instance for which an optimal or approximate solution can be found at the minimum distance from the initial instance in the metric introduced. Instead of solving the original problem (instance), a set of approximating polynomially/pseudopolynomially solvable problems (instances) are considered, an instance at the minimum distance from the given one is chosen, and the resulting schedule is then applied to the original instance.

  8. Maximizing work integration in job placement of individuals facing mental health problems: Supervisor experiences.

    PubMed

    Skarpaas, Lisebet Skeie; Ramvi, Ellen; Løvereide, Lise; Aas, Randi Wågø

    2015-01-01

    Many people confronting mental health problems are excluded from participation in paid work. Supervisor engagement is essential for successful job placement. To elicit supervisor perspectives on the challenges involved in fostering integration to support individuals with mental health problems (trainees) in their job placement at ordinary companies. Explorative, qualitative designed study with a phenomenological approach, based on semi-structured interviews with 15 supervisors involved in job placements for a total of 105 trainees (mean 7, min-max. 1-30, SD 8). Data were analysed using qualitative content analysis. Superviors experience two interrelated dilemmas concerning knowledge of the trainee and degree of preferential treatment. Challenges to obtaining successful integration were; motivational: 1) Supervisors previous experience with trainees encourages future engagement, 2) Developing a realistic picture of the situation, and 3) Disclosure and knowledge of mental health problems, and continuity challenges: 4) Sustaining trainee cooperation throughout the placement process, 5) Building and maintaining a good relationship between supervisor and trainee, and 6) Ensuring continuous cooperation with the social security system and other stakeholders. Supervisors experience relational dilemmas regarding pre-judgment, privacy and equality. Job placement seem to be maximized when the stakeholders are motivated and recognize that cooperation must be a continuous process.

  9. 28 CFR 345.83 - Job safety training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Job safety training. 345.83 Section 345... INDUSTRIES (FPI) INMATE WORK PROGRAMS FPI Inmate Training and Scholarship Programs § 345.83 Job safety training. FPI provides inmates with regular job safety training which is developed and scheduled in...

  10. 28 CFR 345.83 - Job safety training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Job safety training. 345.83 Section 345... INDUSTRIES (FPI) INMATE WORK PROGRAMS FPI Inmate Training and Scholarship Programs § 345.83 Job safety training. FPI provides inmates with regular job safety training which is developed and scheduled in...

  11. 28 CFR 345.83 - Job safety training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Job safety training. 345.83 Section 345... INDUSTRIES (FPI) INMATE WORK PROGRAMS FPI Inmate Training and Scholarship Programs § 345.83 Job safety training. FPI provides inmates with regular job safety training which is developed and scheduled in...

  12. 28 CFR 345.83 - Job safety training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Job safety training. 345.83 Section 345... INDUSTRIES (FPI) INMATE WORK PROGRAMS FPI Inmate Training and Scholarship Programs § 345.83 Job safety training. FPI provides inmates with regular job safety training which is developed and scheduled in...

  13. 28 CFR 345.83 - Job safety training.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Job safety training. 345.83 Section 345... INDUSTRIES (FPI) INMATE WORK PROGRAMS FPI Inmate Training and Scholarship Programs § 345.83 Job safety training. FPI provides inmates with regular job safety training which is developed and scheduled in...

  14. Two-MILP models for scheduling elective surgeries within a private healthcare facility.

    PubMed

    Khlif Hachicha, Hejer; Zeghal Mansour, Farah

    2016-11-05

    This paper deals with an Integrated Elective Surgery-Scheduling Problem (IESSP) that arises in a privately operated healthcare facility. It aims to optimize the resource utilization of the entire surgery process including pre-operative, per-operative and post-operative activities. Moreover, it addresses a specific feature of private facilities where surgeons are independent service providers and may conduct their surgeries in different private healthcare facilities. Thus, the problem requires the assignment of surgery patients to hospital beds, operating rooms and recovery beds as well as their sequencing over a 1-day period while taking into account surgeons' availability constraints. We present two Mixed Integer Linear Programs (MILP) that model the IESSP as a three-stage hybrid flow-shop scheduling problem with recirculation, resource synchronization, dedicated machines, and blocking constraints. To assess the empirical performance of the proposed models, we conducted experiments on real-world data of a Tunisian private clinic: Clinique Ennasr and on randomly generated instances. Two criteria were minimised: the patients' average length of stay and the number of patients' overnight stays. The computational results show that the proposed models can solve instances with up to 44 surgical cases in a reasonable CPU time using a general-purpose MILP solver.

  15. Limited access: gender, occupational composition, and flexible work scheduling.

    PubMed

    Glauber, Rebecca

    2011-01-01

    The current study draws on national data to explore differences in access to flexible work scheduling by the gender composition of women's and men's occupations. Results show that those who work in integrated occupations are more likely to have access to flexible scheduling. Women and men do not take jobs with lower pay in return for greater access to flexibility. Instead, jobs with higher pay offer greater flexibility. Integrated occupations tend to offer the greatest access to flexible scheduling because of their structural locations. Part-time work is negatively associated with men's access to flexible scheduling but positively associated with women's access. Women have greater flexibility when they work for large establishments, whereas men have greater flexibility when they work for small establishments.

  16. Constraint-Directed Search: A Case Study of Job-Shop Scheduling.

    DTIC Science & Technology

    1983-12-13

    Structures But Were Unable to Represent", Proceedings of the American Association for Aritificial Intelligence , pp. 212-214, Stanford University...under these constraints raises a number of issues of interest to the artificial intelligence community such as: - knowledge representation semantics for...Management Science 15 2.3. Artificial Intelligence 17 2.4. Relationship to Previous Research 21 3. ISIS Modeling System 23 3.1. Introduction 24 3.2. Layer

  17. ShopComm: Community-Supported Online Shopping for Older Adults.

    PubMed

    Gorkovenko, Katerina; Tigwell, Garreth W; Norrie, Christopher S; Waite, Miriam; Herron, Daniel

    2017-01-01

    The United Kingdom has an ageing population whose members experience significant life transitions as they grow older, for example, losing mobility due to deteriorating health. For these adults, digital technology has the potential to sustain their independence and improve their quality of life. However older adults can be reluctant to use digital solutions. In this paper, we review a local charity providing a grocery shopping service for older adults who are unable to go themselves. We explore how older adults perceive the benefits and drawbacks of both physical and digital shopping. Using these insights, we designed ShopComm to enable and support older adults with mobility impairments to shop online.

  18. An engine awaits processing in the new engine shop at KSC

    NASA Technical Reports Server (NTRS)

    1998-01-01

    A new Block 2A engine awaits processing in the low bay of the Space Shuttle Main Engine Processing Facility (SSMEPF). Officially opened on July 6, the new facility replaces the Shuttle Main Engine Shop. The SSMEPF is an addition to the existing Orbiter Processing Facility Bay 3. The engine is scheduled to fly on the Space Shuttle Endeavour during the STS-88 mission in December 1998.

  19. An Algorithm for the Weighted Earliness-Tardiness Unconstrained Project Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Afshar Nadjafi, Behrouz; Shadrokh, Shahram

    This research considers a project scheduling problem with the object of minimizing weighted earliness-tardiness penalty costs, taking into account a deadline for the project and precedence relations among the activities. An exact recursive method has been proposed for solving the basic form of this problem. We present a new depth-first branch and bound algorithm for extended form of the problem, which time value of money is taken into account by discounting the cash flows. The algorithm is extended with two bounding rules in order to reduce the size of the branch and bound tree. Finally, some test problems are solved and computational results are reported.

  20. Problems in the Application of Behavior Modification Principles for Teaching Job-Required Behaviors to Disadvantaged Manpower Trainees. Special Report.

    ERIC Educational Resources Information Center

    Feifer, Irwin; And Others

    In its attempts to apply behavior modification principles to teaching job-required behaviors to manpower trainees, the Mobilization for Youth-Experimental Manpower Laboratory (MFY-EML), has mounted a number of reinforcement-based Neighborhood Youth Corps training programs. The nature, magnitude and scheduling of reinforcers, the nature of the…

  1. An Empirical Comparison of Seven Iterative and Evolutionary Function Optimization Heuristics

    NASA Technical Reports Server (NTRS)

    Baluja, Shumeet

    1995-01-01

    This report is a repository of the results obtained from a large scale empirical comparison of seven iterative and evolution-based optimization heuristics. Twenty-seven static optimization problems, spanning six sets of problem classes which are commonly explored in genetic algorithm literature, are examined. The problem sets include job-shop scheduling, traveling salesman, knapsack, binpacking, neural network weight optimization, and standard numerical optimization. The search spaces in these problems range from 2368 to 22040. The results indicate that using genetic algorithms for the optimization of static functions does not yield a benefit, in terms of the final answer obtained, over simpler optimization heuristics. Descriptions of the algorithms tested and the encodings of the problems are described in detail for reproducibility.

  2. A Novel Strategy Using Factor Graphs and the Sum-Product Algorithm for Satellite Broadcast Scheduling Problems

    NASA Astrophysics Data System (ADS)

    Chen, Jung-Chieh

    This paper presents a low complexity algorithmic framework for finding a broadcasting schedule in a low-altitude satellite system, i. e., the satellite broadcast scheduling (SBS) problem, based on the recent modeling and computational methodology of factor graphs. Inspired by the huge success of the low density parity check (LDPC) codes in the field of error control coding, in this paper, we transform the SBS problem into an LDPC-like problem through a factor graph instead of using the conventional neural network approaches to solve the SBS problem. Based on a factor graph framework, the soft-information, describing the probability that each satellite will broadcast information to a terminal at a specific time slot, is exchanged among the local processing in the proposed framework via the sum-product algorithm to iteratively optimize the satellite broadcasting schedule. Numerical results show that the proposed approach not only can obtain optimal solution but also enjoys the low complexity suitable for integral-circuit implementation.

  3. Applications of Evolutionary Technology to Manufacturing and Logistics Systems : State-of-the Art Survey

    NASA Astrophysics Data System (ADS)

    Gen, Mitsuo; Lin, Lin

    Many combinatorial optimization problems from industrial engineering and operations research in real-world are very complex in nature and quite hard to solve them by conventional techniques. Since the 1960s, there has been an increasing interest in imitating living beings to solve such kinds of hard combinatorial optimization problems. Simulating the natural evolutionary process of human beings results in stochastic optimization techniques called evolutionary algorithms (EAs), which can often outperform conventional optimization methods when applied to difficult real-world problems. In this survey paper, we provide a comprehensive survey of the current state-of-the-art in the use of EA in manufacturing and logistics systems. In order to demonstrate the EAs which are powerful and broadly applicable stochastic search and optimization techniques, we deal with the following engineering design problems: transportation planning models, layout design models and two-stage logistics models in logistics systems; job-shop scheduling, resource constrained project scheduling in manufacturing system.

  4. Is the Process the Problem? Impact of Selection Methods on Reported Job Satisfaction among Academic Department Chairs

    ERIC Educational Resources Information Center

    Fairchild, Julie E.

    2013-01-01

    The problem of low job satisfaction (JS) among academic department chairs (ADC) may result from the selection process. ADC searches seldom comply with best practices for hiring or are predictive of a good fit. Formal searches are seldom used. Some incumbents did not want the job. Research into the history, nature, and problems of the position…

  5. View north of inside machine shop 36; shop floor accommodates ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View north of inside machine shop 36; shop floor accommodates lathes capable of machining a cylinder 60 inches in diameter and 75 feet long; other equipment includes horizontal and vertical jig borders, hydraulic tube straighteners and other equipment for precision machining of large ship components. - Naval Base Philadelphia-Philadelphia Naval Shipyard, Structure Shop, League Island, Philadelphia, Philadelphia County, PA

  6. Capability of the Maximax&Maximin selection operator in the evolutionary algorithm for a nurse scheduling problem

    NASA Astrophysics Data System (ADS)

    Ramli, Razamin; Tein, Lim Huai

    2016-08-01

    A good work schedule can improve hospital operations by providing better coverage with appropriate staffing levels in managing nurse personnel. Hence, constructing the best nurse work schedule is the appropriate effort. In doing so, an improved selection operator in the Evolutionary Algorithm (EA) strategy for a nurse scheduling problem (NSP) is proposed. The smart and efficient scheduling procedures were considered. Computation of the performance of each potential solution or schedule was done through fitness evaluation. The best so far solution was obtained via special Maximax&Maximin (MM) parent selection operator embedded in the EA, which fulfilled all constraints considered in the NSP.

  7. Multi-objective ACO algorithms to minimise the makespan and the total rejection cost on BPMs with arbitrary job weights

    NASA Astrophysics Data System (ADS)

    Jia, Zhao-hong; Pei, Ming-li; Leung, Joseph Y.-T.

    2017-12-01

    In this paper, we investigate the batch-scheduling problem with rejection on parallel machines with non-identical job sizes and arbitrary job-rejected weights. If a job is rejected, the corresponding penalty has to be paid. Our objective is to minimise the makespan of the processed jobs and the total rejection cost of the rejected jobs. Based on the selected multi-objective optimisation approaches, two problems, P1 and P2, are considered. In P1, the two objectives are linearly combined into one single objective. In P2, the two objectives are simultaneously minimised and the Pareto non-dominated solution set is to be found. Based on the ant colony optimisation (ACO), two algorithms, called LACO and PACO, are proposed to address the two problems, respectively. Two different objective-oriented pheromone matrices and heuristic information are designed. Additionally, a local optimisation algorithm is adopted to improve the solution quality. Finally, simulated experiments are conducted, and the comparative results verify the effectiveness and efficiency of the proposed algorithms, especially on large-scale instances.

  8. Technical and Occupational Shops.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…

  9. The Use of the Position Analysis Questionnaire in Selecting Correlates of Job Performance Among Mentally Retarded Workers

    ERIC Educational Resources Information Center

    And Others; Townsend, J. William

    1974-01-01

    The present study investigated the efficiency of various existing measures, mainly psychological tests, for predicting job performance of mentally retarded workers in a sheltered occupational shop. Results indicated that existing measures are predictive of performance on some but not all jobs in a sheltered workshop. (Author)

  10. Automated problem scheduling and reduction of synchronization delay effects

    NASA Technical Reports Server (NTRS)

    Saltz, Joel H.

    1987-01-01

    It is anticipated that in order to make effective use of many future high performance architectures, programs will have to exhibit at least a medium grained parallelism. A framework is presented for partitioning very sparse triangular systems of linear equations that is designed to produce favorable preformance results in a wide variety of parallel architectures. Efficient methods for solving these systems are of interest because: (1) they provide a useful model problem for use in exploring heuristics for the aggregation, mapping and scheduling of relatively fine grained computations whose data dependencies are specified by directed acrylic graphs, and (2) because such efficient methods can find direct application in the development of parallel algorithms for scientific computation. Simple expressions are derived that describe how to schedule computational work with varying degrees of granularity. The Encore Multimax was used as a hardware simulator to investigate the performance effects of using the partitioning techniques presented in shared memory architectures with varying relative synchronization costs.

  11. Scheduling a Medium-Sized Manufacturing Shop: A Simulation Study

    DTIC Science & Technology

    1993-09-01

    distinction, elements of work order data include: the minimum machine type required for a work order, as well as the prgramming , set-up, and machining... prevent this from happening. Such a mechanism could take the form of a reprioritization function that is executed after a specified period of time...system for a very long time unless some mechanism is used to prevent this from happening. The jobs left in the system will be the ones that have very

  12. CMS Readiness for Multi-Core Workload Scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perez-Calero Yzquierdo, A.; Balcas, J.; Hernandez, J.

    In the present run of the LHC, CMS data reconstruction and simulation algorithms benefit greatly from being executed as multiple threads running on several processor cores. The complexity of the Run 2 events requires parallelization of the code to reduce the memory-per- core footprint constraining serial execution programs, thus optimizing the exploitation of present multi-core processor architectures. The allocation of computing resources for multi-core tasks, however, becomes a complex problem in itself. The CMS workload submission infrastructure employs multi-slot partitionable pilots, built on HTCondor and GlideinWMS native features, to enable scheduling of single and multi-core jobs simultaneously. This provides amore » solution for the scheduling problem in a uniform way across grid sites running a diversity of gateways to compute resources and batch system technologies. This paper presents this strategy and the tools on which it has been implemented. The experience of managing multi-core resources at the Tier-0 and Tier-1 sites during 2015, along with the deployment phase to Tier-2 sites during early 2016 is reported. The process of performance monitoring and optimization to achieve efficient and flexible use of the resources is also described.« less

  13. CMS readiness for multi-core workload scheduling

    NASA Astrophysics Data System (ADS)

    Perez-Calero Yzquierdo, A.; Balcas, J.; Hernandez, J.; Aftab Khan, F.; Letts, J.; Mason, D.; Verguilov, V.

    2017-10-01

    In the present run of the LHC, CMS data reconstruction and simulation algorithms benefit greatly from being executed as multiple threads running on several processor cores. The complexity of the Run 2 events requires parallelization of the code to reduce the memory-per- core footprint constraining serial execution programs, thus optimizing the exploitation of present multi-core processor architectures. The allocation of computing resources for multi-core tasks, however, becomes a complex problem in itself. The CMS workload submission infrastructure employs multi-slot partitionable pilots, built on HTCondor and GlideinWMS native features, to enable scheduling of single and multi-core jobs simultaneously. This provides a solution for the scheduling problem in a uniform way across grid sites running a diversity of gateways to compute resources and batch system technologies. This paper presents this strategy and the tools on which it has been implemented. The experience of managing multi-core resources at the Tier-0 and Tier-1 sites during 2015, along with the deployment phase to Tier-2 sites during early 2016 is reported. The process of performance monitoring and optimization to achieve efficient and flexible use of the resources is also described.

  14. Which resources moderate the effects of demanding work schedules on nurses working in residential elder care? A longitudinal study.

    PubMed

    Peters, Velibor; Houkes, Inge; de Rijk, Angelique E; Bohle, Philip L; Engels, Josephine A; Nijhuis, Frans J N

    2016-06-01

    Shiftwork is a major job demand for nurses and has been related to various negative consequences. Research suggests that personal and job resources moderate the impact of work schedules on stress, health and well-being. This longitudinal study examined whether the interactions of personal and job resources with work schedule demands predicted work engagement and emotional exhaustion in nursing. This longitudinal study included two waves of data collection with a one year follow-up using self-report questionnaires among 247 nurses working shifts or irregular working hours in residential care for the elderly in the Netherlands. Moderated structural equation modelling was conducted to examine the interactions between personal and job resources and work schedule demands. Two work schedule demands were assessed: type of work schedule (demanding vs. less demanding) and average weekly working hours. Two personal resources, active coping and healthy lifestyle, and two job resources, work schedule control and the work schedule fit with nurses' private life, were assessed. Results showed that the work schedule fit with nurses' private life buffered the relationship between work schedule demands and emotional exhaustion one year later. Furthermore, the work schedule fit with nurses' private life increased work engagement one year later when work schedule demands were high. Work schedule control strengthened the positive relationship between work schedule demands and emotional exhaustion one year later. The personal resources, active coping and healthy lifestyle were no moderators in this model. Nurses suffer less from decreasing work engagement and emotional exhaustion due to work schedule demands when their work schedules fit with their private lives. Work schedule control did not buffer, but strengthened the positive relationship between weekly working hours and emotional exhaustion one year later. Job resources appeared to be more important for nurses' well-being than

  15. Contributions of Self-Efficacy and Problem Solving Skills on Secretaries' Job Performance in Ogun State Public Service, Nigeria

    ERIC Educational Resources Information Center

    Abosede, Subuola Catherine; Adesanya, Adebimpe Olusola

    2017-01-01

    This study is aimed at determining the contributions of self-efficacy and problem solving skills to the job performance of secretaries. The study also ascertained the relationship among self-efficacy, problem solving skills and job performance of the secretaries. The study employed the descriptive research design. Ten (10) secretaries were…

  16. Consultation behaviour of doctor-shopping patients and factors that reduce shopping.

    PubMed

    Ohira, Yoshiyuki; Ikusaka, Masatomi; Noda, Kazutaka; Tsukamoto, Tomoko; Takada, Toshihiko; Miyahara, Masahito; Funakoshi, Hiraku; Basugi, Ayako; Keira, Katsunori; Uehara, Takanori

    2012-04-01

    To investigate the subsequent behaviour of doctor-shopping patients (defined as those attending multiple hospitals for the same complaint) who consulted our department and factors related to cessation of doctor shopping. Patients who presented without referral to the Department of General Medicine at Chiba University Hospital in Japan (our department) completed a questionnaire at their first visit. A follow-up questionnaire was also sent to them in order to assess doctor shopping after 3 months. Then items in the questionnaires were investigated for significant differences between patients who continued or stopped doctor shopping. Logistic regression analysis was performed with items showing a significant difference between patients who stopped doctor shopping and those who continued it, in order to identify independent determinants of the cessation of shopping. A total of 978 patients who presented spontaneously to our department consented to this study, and 929 patients (95.0%) completed questionnaires correctly. Among them, 203 patients (21.9%) were identified as doctor shoppers. The follow-up survey was completed correctly by 138 patients (68.0%). Among them, 25 patients (18.1%) were found to have continued doctor shopping, which was a significantly lower rate than before (P < 0.001). Logistic regression analysis selected the following factors as independent determinants of the cessation of doctor shopping: 'confirmation of the diagnosis' (odds ratio: 8.12, 95% confidence interval: 1.46-45.26), and 'satisfaction with consultation' (odds ratio: 2.07, 95% confidence interval: 1.42-3.01). Doctor shopping decreased significantly after patients consulted our department, with 'confirmation of the diagnosis' and 'satisfaction with consultation' being identified as contributing factors. © 2010 Blackwell Publishing Ltd.

  17. A hybrid dynamic harmony search algorithm for identical parallel machines scheduling

    NASA Astrophysics Data System (ADS)

    Chen, Jing; Pan, Quan-Ke; Wang, Ling; Li, Jun-Qing

    2012-02-01

    In this article, a dynamic harmony search (DHS) algorithm is proposed for the identical parallel machines scheduling problem with the objective to minimize makespan. First, an encoding scheme based on a list scheduling rule is developed to convert the continuous harmony vectors to discrete job assignments. Second, the whole harmony memory (HM) is divided into multiple small-sized sub-HMs, and each sub-HM performs evolution independently and exchanges information with others periodically by using a regrouping schedule. Third, a novel improvisation process is applied to generate a new harmony by making use of the information of harmony vectors in each sub-HM. Moreover, a local search strategy is presented and incorporated into the DHS algorithm to find promising solutions. Simulation results show that the hybrid DHS (DHS_LS) is very competitive in comparison to its competitors in terms of mean performance and average computational time.

  18. A Market-Based Approach to Multi-factory Scheduling

    NASA Astrophysics Data System (ADS)

    Vytelingum, Perukrishnen; Rogers, Alex; MacBeth, Douglas K.; Dutta, Partha; Stranjak, Armin; Jennings, Nicholas R.

    In this paper, we report on the design of a novel market-based approach for decentralised scheduling across multiple factories. Specifically, because of the limitations of scheduling in a centralised manner - which requires a center to have complete and perfect information for optimality and the truthful revelation of potentially commercially private preferences to that center - we advocate an informationally decentralised approach that is both agile and dynamic. In particular, this work adopts a market-based approach for decentralised scheduling by considering the different stakeholders representing different factories as self-interested, profit-motivated economic agents that trade resources for the scheduling of jobs. The overall schedule of these jobs is then an emergent behaviour of the strategic interaction of these trading agents bidding for resources in a market based on limited information and their own preferences. Using a simple (zero-intelligence) bidding strategy, we empirically demonstrate that our market-based approach achieves a lower bound efficiency of 84%. This represents a trade-off between a reasonable level of efficiency (compared to a centralised approach) and the desirable benefits of a decentralised solution.

  19. Active Job Monitoring in Pilots

    NASA Astrophysics Data System (ADS)

    Kuehn, Eileen; Fischer, Max; Giffels, Manuel; Jung, Christopher; Petzold, Andreas

    2015-12-01

    Recent developments in high energy physics (HEP) including multi-core jobs and multi-core pilots require data centres to gain a deep understanding of the system to monitor, design, and upgrade computing clusters. Networking is a critical component. Especially the increased usage of data federations, for example in diskless computing centres or as a fallback solution, relies on WAN connectivity and availability. The specific demands of different experiments and communities, but also the need for identification of misbehaving batch jobs, requires an active monitoring. Existing monitoring tools are not capable of measuring fine-grained information at batch job level. This complicates network-aware scheduling and optimisations. In addition, pilots add another layer of abstraction. They behave like batch systems themselves by managing and executing payloads of jobs internally. The number of real jobs being executed is unknown, as the original batch system has no access to internal information about the scheduling process inside the pilots. Therefore, the comparability of jobs and pilots for predicting run-time behaviour or network performance cannot be ensured. Hence, identifying the actual payload is important. At the GridKa Tier 1 centre a specific tool is in use that allows the monitoring of network traffic information at batch job level. This contribution presents the current monitoring approach and discusses recent efforts and importance to identify pilots and their substructures inside the batch system. It will also show how to determine monitoring data of specific jobs from identified pilots. Finally, the approach is evaluated.

  20. Dawn Usage, Scheduling, and Governance Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Louis, S

    2009-11-02

    This document describes Dawn use, scheduling, and governance concerns. Users started running full-machine science runs in early April 2009 during the initial open shakedown period. Scheduling Dawn while in the Open Computing Facility (OCF) was controlled and coordinated via phone calls, emails, and a small number of controlled banks. With Dawn moving to the Secure Computing Facility (SCF) in fall of 2009, a more detailed scheduling and governance model is required. The three major objectives are: (1) Ensure Dawn resources are allocated on a program priority-driven basis; (2) Utilize Dawn resources on the job mixes for which they were intended;more » and (3) Minimize idle cycles through use of partitions, banks and proper job mix. The SCF workload for Dawn will be inherently different than Purple or BG/L, and therefore needs a different approach. Dawn's primary function is to permit adequate access for tri-lab code development in preparation for Sequoia, and in particular for weapons multi-physics codes in support of UQ. A second purpose is to provide time allocations for large-scale science runs and for UQ suite calculations to advance SSP program priorities. This proposed governance model will be the basis for initial time allocation of Dawn computing resources for the science and UQ workloads that merit priority on this class of resource, either because they cannot be reasonably attempted on any other resources due to size of problem, or because of the unavailability of sizable allocations on other ASC capability or capacity platforms. This proposed model intends to make the most effective use of Dawn as possible, but without being overly constrained by more formal proposal processes such as those now used for Purple CCCs.« less

  1. An iPad™-based picture and video activity schedule increases community shopping skills of a young adult with autism spectrum disorder and intellectual disability.

    PubMed

    Burckley, Elizabeth; Tincani, Matt; Guld Fisher, Amanda

    2015-04-01

    To evaluate the iPad 2™ with Book Creator™ software to provide visual cues and video prompting to teach shopping skills in the community to a young adult with an autism spectrum disorder and intellectual disability. A multiple probe across settings design was used to assess effects of the intervention on the participant's independence with following a shopping list in a grocery store across three community locations. Visual cues and video prompting substantially increased the participant's shopping skills within two of the three community locations, skill increases maintained after the intervention was withdrawn, and shopping skills generalized to two untaught shopping items. Social validity surveys suggested that the participant's parent and staff favorably viewed the goals, procedures, and outcomes of intervention. The iPad 2™ with Book Creator™ software may be an effective way to teach independent shopping skills in the community; additional replications are needed.

  2. Problem-Solving Management Training Effects on Sales Productivity and Job Satisfaction.

    ERIC Educational Resources Information Center

    Ross, Paul C.; And Others

    Research suggests that effective organizational change must be led by line personnel rather than by outside consultants. The Performance Management Program (PMP) implemented in two Bell Telephone companies is a line-led, self-help program in which managers participate in problem-solving activities within their own jobs. Marketing and sales…

  3. Job Evaluation: Pay Equity Problem or Solution?

    ERIC Educational Resources Information Center

    Mecham, Robert C.

    It has been hypothesized that current methods of determining pay rates value the characteristics of jobs held primarily by men differently than the characteristics of jobs held primarily by women, resulting in lower earnings for women. A policy capturing approach using numerically rated job characteristics (PAQ data) was applied separately to the…

  4. A multi-group and preemptable scheduling of cloud resource based on HTCondor

    NASA Astrophysics Data System (ADS)

    Jiang, Xiaowei; Zou, Jiaheng; Cheng, Yaodong; Shi, Jingyan

    2017-10-01

    Due to the features of virtual machine-flexibility, easy controlling and various system environments, more and more fields utilize the virtualization technology to construct the distributed system with the virtual resources, also including high energy physics. This paper introduce a method used in high energy physics that supports multiple resource group and preemptable cloud resource scheduling, combining virtual machine with HTCondor (a batch system). It makes resource controlling more flexible and more efficient and makes resource scheduling independent of job scheduling. Firstly, the resources belong to different experiment-groups, and the type of user-groups mapping to resource-groups(same as experiment-group) is one-to-one or many-to-one. In order to make the confused group simply to be managed, we designed the permission controlling component to ensure that the different resource-groups can get the suitable jobs. Secondly, for the purpose of elastically allocating resources for suitable resource-group, it is necessary to schedule resources like scheduling jobs. So this paper designs the cloud resource scheduling to maintain a resource queue and allocate an appropriate amount of virtual resources to the request resource-group. Thirdly, in some kind of situations, because of the resource occupied for a long time, resources need to be preempted. This paper adds the preemption function for the resource scheduling that implement resource preemption based on the group priority. Additionally, the way to preempting is soft that when virtual resources are preempted, jobs will not be killed but also be held and rematched later. It is implemented with the help of HTCondor, storing the held job information in scheduler, releasing the job to idle status and doing second matcher. In IHEP (institute of high energy physics), we have built a batch system based on HTCondor with a virtual resources pool based on Openstack. And this paper will show some cases of experiment JUNO

  5. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  6. In-Space Crew-Collaborative Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2007-01-01

    For all past and current human space missions, the final scheduling of tasks to be done in space has been devoid of crew control, flexibility, and insight. Ground controllers, with minimal input from the crew, schedule the tasks and uplink the timeline to the crew or uplink the command sequences to the hardware. Prior to the International Space Station (ISS), the crew could make requests about tomorrow s timeline, they could omit a task, or they could request that something in the timeline be delayed. This lack of control over one's own schedule has had negative consequences. There is anecdotal consensus among astronauts that control over their own schedules will mitigate the stresses of long duration missions. On ISS, a modicum of crew control is provided by the job jar. Ground controllers prepare a task list (a.k.a. "job jar") of non-conflicting tasks from which jobs can be chosen by the in space crew. Because there is little free time and few interesting non-conflicting activities, the task-list approach provides little relief from the tedium of being micro-managed by the timeline. Scheduling for space missions is a complex and laborious undertaking which usually requires a large cadre of trained specialists and suites of complex software tools. It is a giant leap from today s ground prepared timeline (with a job jar) to full crew control of the timeline. However, technological advances, currently in-work or proposed, make it reasonable to consider scheduling a collaborative effort by the ground-based teams and the in-space crew. Collaboration would allow the crew to make minor adjustments, add tasks according to their preferences, understand the reasons for the placement of tasks on the timeline, and provide them a sense of control. In foreseeable but extraordinary situations, such as a quick response to anomalies and extended or unexpected loss of signal, the crew should have the autonomous ability to make appropriate modifications to the timeline, extend the

  7. Treatment of chromium contaminated plating shop rinsewater streams by reverse osmosis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, J.F.; Brown, C.H. Jr.; Wilson, J.H.

    1988-01-01

    Wastewater is discharged to the local sanitary sewer, which is regulated by a Metropolitan Sewer District (MSD). The MSD has established discharge limits and reports have indicated that the major source of wastewater and primary area of concern is the discharge from the industrial plating shop within the plant complex. This plating shop generates /approximately/1100 m/sup 3/ (300,000 gal) of wastewater per day. Because construction of a new plating shop is currently planned, a complete renovation of the existing plating shop is not economically feasible. The sponsor demonstrated the use of innovative wastewater treatment technologies that will minimize the amountmore » of wastewater generated from the plating processes and maintain compliance with MSD discharge limits until the new plating shop is constructed. The problems at the facility have been analyzed and a treatment system utilizing reverse osmosis (RO), with volume reduction of the RO concentrate by evaporation, has been recommended. The utilization of RO meets the specification for the demonstration of innovative technology. This paper discusses the problem analysis at the plant as well as the results of a pilot scale RO test program currently being conducted. The installation of the full scale unit is dependent on the successful completion of the RO pilot tests. 1 ref., 6 figs., 3 tabs.« less

  8. Providing Better University Personnel through Job Sharing.

    ERIC Educational Resources Information Center

    Hutton, Clifford E.; McFarlin, Joy Simon

    1982-01-01

    Universities could benefit by offering more flexible part-time job opportunities such as job-sharing, following an apparent national trend in accommodating social and economic needs. Institutions have many options in scheduling and allocating tasks. Possible benefits include improved employee attitude and productivity. (MSE)

  9. Job Language Performance Requirements for MOS 15E PERSHING Missile Crewman.

    DTIC Science & Technology

    1977-04-12

    DATA GATHERING TASK OBSERVATION STRUCTURAL PRIORITIZATION PORN INVENTORYq CHECKLIST FIGUJRE 2 In order to establish Job Language Performance Requirements...Profanity F. Shop talk/slang G. Non-standard English Media of Instruction I. Other Comments: A. 𔄁ilms B. Video cassettes C. Graphic Training Aids

  10. Enhancements of evolutionary algorithm for the complex requirements of a nurse scheduling problem

    NASA Astrophysics Data System (ADS)

    Tein, Lim Huai; Ramli, Razamin

    2014-12-01

    Over the years, nurse scheduling is a noticeable problem that is affected by the global nurse turnover crisis. The more nurses are unsatisfied with their working environment the more severe the condition or implication they tend to leave. Therefore, the current undesirable work schedule is partly due to that working condition. Basically, there is a lack of complimentary requirement between the head nurse's liability and the nurses' need. In particular, subject to highly nurse preferences issue, the sophisticated challenge of doing nurse scheduling is failure to stimulate tolerance behavior between both parties during shifts assignment in real working scenarios. Inevitably, the flexibility in shifts assignment is hard to achieve for the sake of satisfying nurse diverse requests with upholding imperative nurse ward coverage. Hence, Evolutionary Algorithm (EA) is proposed to cater for this complexity in a nurse scheduling problem (NSP). The restriction of EA is discussed and thus, enhancement on the EA operators is suggested so that the EA would have the characteristic of a flexible search. This paper consists of three types of constraints which are the hard, semi-hard and soft constraints that can be handled by the EA with enhanced parent selection and specialized mutation operators. These operators and EA as a whole contribute to the efficiency of constraint handling, fitness computation as well as flexibility in the search, which correspond to the employment of exploration and exploitation principles.

  11. Investigation of an outbreak of "humidifier fever" in a print shop.

    PubMed

    Mamolen, M; Lewis, D M; Blanchet, M A; Satink, F J; Vogt, R L

    1993-03-01

    An outbreak of "humidifier fever" affected 16 (57%) of 28 workers in a print shop. The most common symptoms were myalgia, chills or subjective fever, and cough. Illness began 5-13 hours after entering the workplace, and lasted 2-24 hours. A humidifier in use the day of the outbreak was found to be contaminated with fungi, amebae, and Gram-negative bacteria. The risk of illness was highest for those who had been on the job 3 months before the outbreak, a time when the humidifier was in constant use. Serologic studies of print shop workers showed positive reactions to extracts of organisms isolated from the humidifier, but could neither distinguish ill from well workers, nor identify causative organisms. The presence of endotoxin-producing bacteria and the clinical syndrome are consistent with an organic dust toxic syndrome. Previous exposure appeared to be the major risk factor for illness.

  12. Psychometric Properties of the Disability Assessment Schedule (DAS) for Behavior Problems: An Independent Investigation

    ERIC Educational Resources Information Center

    Tsakanikos, Elias; Underwood, Lisa; Sturmey, Peter; Bouras, Nick; McCarthy, Jane

    2011-01-01

    The present study employed the Disability Assessment Schedule (DAS) to assess problem behaviors in a large sample of adults with ID (N = 568) and evaluate the psychometric properties of this instrument. Although the DAS problem behaviors were found to be internally consistent (Cronbach's [alpha] = 0.87), item analysis revealed one weak item…

  13. Mercury Shopping Cart Interface

    NASA Technical Reports Server (NTRS)

    Pfister, Robin; McMahon, Joe

    2006-01-01

    Mercury Shopping Cart Interface (MSCI) is a reusable component of the Power User Interface 5.0 (PUI) program described in another article. MSCI is a means of encapsulating the logic and information needed to describe an orderable item consistent with Mercury Shopping Cart service protocol. Designed to be used with Web-browser software, MSCI generates Hypertext Markup Language (HTML) pages on which ordering information can be entered. MSCI comprises two types of Practical Extraction and Report Language (PERL) modules: template modules and shopping-cart logic modules. Template modules generate HTML pages for entering the required ordering details and enable submission of the order via a Hypertext Transfer Protocol (HTTP) post. Shopping cart modules encapsulate the logic and data needed to describe an individual orderable item to the Mercury Shopping Cart service. These modules evaluate information entered by the user to determine whether it is sufficient for the Shopping Cart service to process the order. Once an order has been passed from MSCI to a deployed Mercury Shopping Cart server, there is no further interaction with the user.

  14. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  15. Impeller Creation at the Fabrication Shop

    NASA Image and Video Library

    1950-10-21

    A mechanic and apprentice work on a wooden impeller in the Fabrication Shop at the NACA Lewis Flight Propulsion Laboratory. The 260-person Fabrication Division created almost all of the equipment and models used at the laboratory. The Technical Services Building, referred to as the “Fab Shop”, contained a number of specialized shops in the 1940s and 1950s. These included a Machine Shop, Sheet Metal Shop, Wood and Pattern Shop, Instrument Shop, Thermocouple Shop, Heat Treating Shop, Metallurgical Laboratory, and Fabrication Office. The Machine Shop fabricated research equipment not commercially available. During World War II these technicians produced high-speed cameras for combustion research, impellers and other supercharger components, and key equipment for the lab’s first supersonic wind tunnel. The Wood and Pattern Shop created everything from control panels and cabinets to aircraft model molds for sheet metal work. The Sheet Metal Shop had the ability to work with 0.01 to 4-inches thick steel plates. The Instrument Shop specialized in miniature parts and instrumentation, while the Thermocouple Shop standardized the installation of pitot tubes and thermocouples. The Metallurgical Laboratory contained a control lab for the Heat Treating Shop and a service lab for the NACA Lewis research divisions. The Heat Treating Shop heated metal parts to optimize their physical properties and contained a Precision Castings Foundry to manufacture equipment made of heat resisting alloys.

  16. Non preemptive soft real time scheduler: High deadline meeting rate on overload

    NASA Astrophysics Data System (ADS)

    Khalib, Zahereel Ishwar Abdul; Ahmad, R. Badlishah; El-Shaikh, Mohamed

    2015-05-01

    While preemptive scheduling has gain more attention among researchers, current work in non preemptive scheduling had shown promising result in soft real time jobs scheduling. In this paper we present a non preemptive scheduling algorithm meant for soft real time applications, which is capable of producing better performance during overload while maintaining excellent performance during normal load. The approach taken by this algorithm has shown more promising results compared to other algorithms including its immediate predecessor. We will present the analysis made prior to inception of the algorithm as well as simulation results comparing our algorithm named gutEDF with EDF and gEDF. We are convinced that grouping jobs utilizing pure dynamic parameters would produce better performance.

  17. Exploring the status of retail private drug shops in Bangladesh and action points for developing an accredited drug shop model: a facility based cross-sectional study.

    PubMed

    Ahmed, Syed Masud; Naher, Nahitun; Hossain, Tarek; Rawal, Lal Bahadur

    2017-01-01

    The private retail drug shops market in Bangladesh is largely unregulated and unaccountable, giving rise to irrational use of drugs and high Out-of-pocket expenditure on health. These shops are served by salespersons with meagre or no formal training in dispensing. This facility-based cross-sectional study was undertaken to investigate how the drug shops currently operate vis-a-vis the regulatory regime including dispensing practices of the salespersons, for identifying key action points to develop an accredited model for Bangladesh. About 90 rural and 21 urban retail drug shops from seven divisions were included in the survey. The salespersons were interviewed for relevant information, supplemented by qualitative data on perceptions of the catchment community as well as structured observation of client-provider interactions from a sub-sample. In 76% of the shops, the owner and the salesperson was the same person, and >90% of these were located within 30 min walking distance from a public sector health facility. The licensing process was perceived to be a cumbersome, lengthy, and costly process. Shop visit by drug inspectors were brief, wasn't structured, and not problem solving. Only 9% shops maintained a stock register and 10% a drug sales record. Overall, 65% clients visited drug shops without a prescription. Forty-nine percent of the salespersons had no formal training in dispensing and learned the trade through apprenticeship with fellow drug retailers (42%), relatives (18%), and village doctors (16%) etc. The catchment population of the drug shops mostly did not bother about dispensing training, drug shop licensing and buying drugs without prescription. Observed client-dispenser interactions were found to concentrate mainly on financial transaction, unless, the client pro-actively sought advice regarding the use of the drug. Majority of the drug shops studied are run by salespersons who have informal 'training' through apprenticeship. Visiting drug shops

  18. Applying the Theory of Constraints to a Base Civil Engineering Operations Branch

    DTIC Science & Technology

    1991-09-01

    Figure Page 1. Typical Work Order Processing . .......... 7 2. Typical Job Order Processing . .......... 8 3. Typical Simplified In-Service Work Plan for...Customers’ Customer Request Service Planning Unit Production] Control Center Material Control Scheduling CE Shops Figure 1.. Typical Work Order Processing 7

  19. Interactive computer aided shift scheduling.

    PubMed

    Gaertner, J

    2001-12-01

    This paper starts with a discussion of computer aided shift scheduling. After a brief review of earlier approaches, two conceptualizations of this field are introduced: First, shift scheduling as a field that ranges from extremely stable rosters at one pole to rather market-like approaches on the other pole. Unfortunately, already small alterations of a scheduling problem (e.g., the number of groups, the number of shifts) may call for rather different approaches and tools. Second, their environment shapes scheduling problems and scheduling has to be done within idiosyncratic organizational settings. This calls for the amalgamation of scheduling with other tasks (e.g., accounting) and for reflections whether better solutions might become possible by changes in the problem definition (e.g., other service levels, organizational changes). Therefore shift scheduling should be understood as a highly connected problem. Building upon these two conceptualizations, a few examples of software that ease scheduling in some areas of this field are given and future research questions are outlined.

  20. Job Priorities on Peregrine | High-Performance Computing | NREL

    Science.gov Websites

    allocation when run with qos=high. Requesting a Node Reservation If you are doing work that requires real scheduler more efficiently plan resources for larger jobs. When projects reach their allocation limit, jobs associated with those projects will run at very low priority, which will ensure that these jobs run only when

  1. On-the-Job Productivity Losses Among Employees With Health Problems: The Role of Work Accommodations.

    PubMed

    Gifford, Brian; Zong, Yang

    2017-09-01

    Debates about the productivity impact of work accommodations typically focus on employment and labor force participation outcomes. This study considers whether accommodations mediate on-the-job productivity losses among employees who report health problems. The study uses ordered logistic regression to predict employees' self-reported productivity losses as a function of health problems and experiences with needed work accommodations. On average, the odds that an employee who did not get a needed accommodation reported higher levels of lost productivity are 5.11 times the odds for an employee who got a needed accommodation. Although health problems make it difficult for many employees to perform well on the job, accommodations could reduce productivity losses in some cases. Nonetheless, more research on the impact of specific kinds of accommodations for different chronic conditions is warranted.

  2. Approximation Algorithms for Multicommodity Flow and Shop Scheduling Problems

    DTIC Science & Technology

    1992-09-01

    DARPA N00014-89-J-1988 11. SUPPLEMENTARY NOTES Ŗa. oIs7RIBU ric.c / AVAILAaILITY STATEMENT, 1.2. 3ISTRIBUT;CN C:. E In this thesis , we give efficient...University Thesis Supervisor Accepted by Campbell L. Searle Chairman, Departmental Committee on Graduate Students Approximation Algorithms for Multicommodity...partial fulfillment of the requirements for the degree of Doctor of Philosophy Abstract In this thesis , we give efficient approximation algorithms for

  3. New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times

    NASA Astrophysics Data System (ADS)

    Kia, Hamidreza; Ghodsypour, Seyed Hassan; Davoudpour, Hamid

    2017-09-01

    In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent setup times is studied. The objective of the problem is minimization of mean flow time and mean tardiness. A 0-1 mixed integer model of the problem is formulated. Since the problem is NP-hard, four new composite dispatching rules are proposed to solve it by applying genetic programming framework and choosing proper operators. Furthermore, a discrete-event simulation model is made to examine the performances of scheduling rules considering four new heuristic rules and the six adapted heuristic rules from the literature. It is clear from the experimental results that composite dispatching rules that are formed from genetic programming have a better performance in minimization of mean flow time and mean tardiness than others.

  4. Integrated production and distribution scheduling problems related to fixed delivery departure dates and weights of late orders.

    PubMed

    Li, Shanlin; Li, Maoqin

    2015-01-01

    We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of orders to be processed on a single production line. Completed orders are delivered to customers by a finite number of vehicles provided by the 3PL company which follows a fixed daily or weekly shipping schedule such that the vehicles have fixed departure dates which are not part of the decisions. The problem is to find a feasible schedule that minimizes one of the following objective functions when processing times and weights are oppositely ordered: (1) the total weight of late orders and (2) the number of vehicles used subject to the condition that the total weight of late orders is minimum. We show that both problems are solvable in polynomial time.

  5. Integrated Production and Distribution Scheduling Problems Related to Fixed Delivery Departure Dates and Weights of Late Orders

    PubMed Central

    Li, Shanlin; Li, Maoqin

    2015-01-01

    We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of orders to be processed on a single production line. Completed orders are delivered to customers by a finite number of vehicles provided by the 3PL company which follows a fixed daily or weekly shipping schedule such that the vehicles have fixed departure dates which are not part of the decisions. The problem is to find a feasible schedule that minimizes one of the following objective functions when processing times and weights are oppositely ordered: (1) the total weight of late orders and (2) the number of vehicles used subject to the condition that the total weight of late orders is minimum. We show that both problems are solvable in polynomial time. PMID:25785285

  6. Shift work, mental distress and job satisfaction among Palestinian nurses.

    PubMed

    Jaradat, Y M; Nielsen, M B; Kristensen, P; Bast-Pettersen, R

    2017-01-01

    Associations between shift work (SW) schedules, mental distress and job satisfaction have never been completely described. To examine gender-specific associations of SW with mental distress and job satisfaction in nurses in Hebron District, Palestine, in 2012. Detailed information on work schedules (day versus shift), socio-demographic status, mental distress (General Health Questionnaire, GHQ-30) and job satisfaction (Generic Job Satisfaction Scale) in nurses employed in Hebron District, Palestine, was obtained through a questionnaire survey. Associations of SW and outcomes were examined by linear regression analysis. Of 372 nurses eligible for the study, 309 and 338 completed surveys regarding mental distress and job satisfaction, respectively. The sample comprised 62% women and 38% men. After adjusting for covariates, women working shifts reported significantly higher levels of mean mental distress [β coefficient 3.6; 95% confidence interval (CI) 0.3-7.0] compared with women working regular day shifts. Men working shifts reported significantly lower levels of job satisfaction (-3.3; 95% CI -6.2 to -0.5) than men working regular day shifts. Women reported higher levels of mental distress than men, but this was unrelated to work schedule. In this study, nurses working shifts reported higher levels of mental distress and lower levels of job satisfaction, although these associations were weaker when adjusted for potential covariates. There was no evidence of a gender differential in the association between SW and mental distress and job satisfaction. © The Author 2016. Published by Oxford University Press on behalf of the Society of Occupational Medicine.

  7. Running Jobs on the Peregrine System | High-Performance Computing | NREL

    Science.gov Websites

    on the Peregrine high-performance computing (HPC) system. Running Different Types of Jobs Batch jobs scheduling policies - queue names, limits, etc. Requesting different node types Sample batch scripts

  8. Working Less and Enjoying It More: Alternative Work Schedules.

    ERIC Educational Resources Information Center

    Shanks, Katherine

    1984-01-01

    Explores three forms of alternative work schedules that research has shown improve job performance and decrease absenteeism: flextime (starting and stopping times vary within limits); permanent part-time employment (regular employment carried out during shorter working hours); and job sharing (two or more part-time employees share one full-time…

  9. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  10. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  11. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  12. Intersections of discrimination due to unemployment and mental health problems: the role of double stigma for job- and help-seeking behaviors.

    PubMed

    Staiger, Tobias; Waldmann, Tamara; Oexle, Nathalie; Wigand, Moritz; Rüsch, Nicolas

    2018-05-21

    The everyday lives of unemployed people with mental health problems can be affected by multiple discrimination, but studies about double stigma-an overlap of identities and experiences of discrimination-in this group are lacking. We therefore studied multiple discrimination among unemployed people with mental health problems and its consequences for job- and help-seeking behaviors. Everyday discrimination and attributions of discrimination to unemployment and/or to mental health problems were examined among 301 unemployed individuals with mental health problems. Job search self-efficacy, barriers to care, and perceived need for treatment were compared among four subgroups, depending on attributions of experienced discrimination to unemployment and to mental health problems (group i); neither to unemployment nor to mental health problems (group ii); mainly to unemployment (group iii); or mainly to mental health problems (group iv). In multiple regressions among all participants, higher levels of discrimination predicted reduced job search self-efficacy and higher barriers to care; and attributions of discrimination to unemployment were associated with increased barriers to care. In ANOVAs for subgroup comparisons, group i participants, who attributed discrimination to both unemployment and mental health problems, reported lower job search self-efficacy, more perceived stigma-related barriers to care and more need for treatment than group iii participants, as well as more stigma-related barriers to care than group iv. Multiple discrimination may affect job search and help-seeking among unemployed individuals with mental health problems. Interventions to reduce public stigma and to improve coping with multiple discrimination for this group should be developed.

  13. SPANR planning and scheduling

    NASA Astrophysics Data System (ADS)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  14. A Two-Stage Stochastic Mixed-Integer Programming Approach to the Smart House Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Ozoe, Shunsuke; Tanaka, Yoichi; Fukushima, Masao

    A “Smart House” is a highly energy-optimized house equipped with photovoltaic systems (PV systems), electric battery systems, fuel cell cogeneration systems (FC systems), electric vehicles (EVs) and so on. Smart houses are attracting much attention recently thanks to their enhanced ability to save energy by making full use of renewable energy and by achieving power grid stability despite an increased power draw for installed PV systems. Yet running a smart house's power system, with its multiple power sources and power storages, is no simple task. In this paper, we consider the problem of power scheduling for a smart house with a PV system, an FC system and an EV. We formulate the problem as a mixed integer programming problem, and then extend it to a stochastic programming problem involving recourse costs to cope with uncertain electricity demand, heat demand and PV power generation. Using our method, we seek to achieve the optimal power schedule running at the minimum expected operation cost. We present some results of numerical experiments with data on real-life demands and PV power generation to show the effectiveness of our method.

  15. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  16. Online shopping hesitation.

    PubMed

    Cho, Chang-Hoan; Kang, Jaewon; Cheon, Hongsik John

    2006-06-01

    This study was designed to understand which factors influence consumer hesitation or delay in online product purchases. The study examined four groups of variables (i.e., consumer characteristics, contextual factors perceived uncertainty factors, and medium/channel innovation factors) that predict three types of online shopping hesitation (i.e., overall hesitation, shopping cart abandonment, and hesitation at the final payment stage). We found that different sets of delay factors are related to different aspects of online shopping hesitation. The study concludes with suggestion for various delay-reduction devices to help consumers close their online decision hesitation.

  17. On Several Fundamental Problems of Optimization, Estimation, and Scheduling in Wireless Communications

    NASA Astrophysics Data System (ADS)

    Gao, Qian

    For both the conventional radio frequency and the comparably recent optical wireless communication systems, extensive effort from the academia had been made in improving the network spectrum efficiency and/or reducing the error rate. To achieve these goals, many fundamental challenges such as power efficient constellation design, nonlinear distortion mitigation, channel training design, network scheduling and etc. need to be properly addressed. In this dissertation, novel schemes are proposed accordingly to deal with specific problems falling in category of these challenges. Rigorous proofs and analyses are provided for each of our work to make a fair comparison with the corresponding peer works to clearly demonstrate the advantages. The first part of this dissertation considers a multi-carrier optical wireless system employing intensity modulation (IM) and direct detection (DD). A block-wise constellation design is presented, which treats the DC-bias that conventionally used solely for biasing purpose as an information basis. Our scheme, we term it MSM-JDCM, takes advantage of the compactness of sphere packing in a higher dimensional space, and in turn power efficient constellations are obtained by solving an advanced convex optimization problem. Besides the significant power gains, the MSM-JDCM has many other merits such as being capable of mitigating nonlinear distortion by including a peak-to-power ratio (PAPR) constraint, minimizing inter-symbol-interference (ISI) caused by frequency-selective fading with a novel precoder designed and embedded, and further reducing the bit-error-rate (BER) by combining with an optimized labeling scheme. The second part addresses several optimization problems in a multi-color visible light communication system, including power efficient constellation design, joint pre-equalizer and constellation design, and modeling of different structured channels with cross-talks. Our novel constellation design scheme, termed CSK-Advanced, is

  18. A generalized network flow model for the multi-mode resource-constrained project scheduling problem with discounted cash flows

    NASA Astrophysics Data System (ADS)

    Chen, Miawjane; Yan, Shangyao; Wang, Sin-Siang; Liu, Chiu-Lan

    2015-02-01

    An effective project schedule is essential for enterprises to increase their efficiency of project execution, to maximize profit, and to minimize wastage of resources. Heuristic algorithms have been developed to efficiently solve the complicated multi-mode resource-constrained project scheduling problem with discounted cash flows (MRCPSPDCF) that characterize real problems. However, the solutions obtained in past studies have been approximate and are difficult to evaluate in terms of optimality. In this study, a generalized network flow model, embedded in a time-precedence network, is proposed to formulate the MRCPSPDCF with the payment at activity completion times. Mathematically, the model is formulated as an integer network flow problem with side constraints, which can be efficiently solved for optimality, using existing mathematical programming software. To evaluate the model performance, numerical tests are performed. The test results indicate that the model could be a useful planning tool for project scheduling in the real world.

  19. Fabrication Division Staff in the Machine Shop

    NASA Image and Video Library

    1946-07-21

    Machine Shop technicians in the Technical Service Building at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The 260-person Fabrication Division, led by Dan White and John Dalgleish, created almost all of the equipment and models used at the laboratory. The Technical Services Building, referred to as the Fab Shop, contained a number of specialized shops in the 1940s and 1950s. These included a Machine Shop, Sheet Metal Shop, Wood and Pattern Shop, Instrument Shop, Thermocouple Shop, Heat Treating Shop, Metallurgical Laboratory, and Fabrication Office. The Machine Shop fabricated specialized research equipment not commercially available. During World War II these technicians produced high-speed cameras for combustion research, impellers and other supercharger components, and key equipment for the lab’s first supersonic wind tunnel. The Wood and Pattern Shop created everything from control panels and cabinets to aircraft model molds for sheet metal work. The Sheet Metal Shop had the ability to work with 0.01 to 4-inch thick steel plates. The Instrument Shop specialized in miniature parts and instrumentation, while the Thermocouple Shop standardized the installation of pitot tubes and thermocouples.

  20. A method of operation scheduling based on video transcoding for cluster equipment

    NASA Astrophysics Data System (ADS)

    Zhou, Haojie; Yan, Chun

    2018-04-01

    Because of the cluster technology in real-time video transcoding device, the application of facing the massive growth in the number of video assignments and resolution and bit rate of diversity, task scheduling algorithm, and analyze the current mainstream of cluster for real-time video transcoding equipment characteristics of the cluster, combination with the characteristics of the cluster equipment task delay scheduling algorithm is proposed. This algorithm enables the cluster to get better performance in the generation of the job queue and the lower part of the job queue when receiving the operation instruction. In the end, a small real-time video transcode cluster is constructed to analyze the calculation ability, running time, resource occupation and other aspects of various algorithms in operation scheduling. The experimental results show that compared with traditional clustering task scheduling algorithm, task delay scheduling algorithm has more flexible and efficient characteristics.

  1. Evolution of CMS workload management towards multicore job support

    NASA Astrophysics Data System (ADS)

    Pérez-Calero Yzquierdo, A.; Hernández, J. M.; Khan, F. A.; Letts, J.; Majewski, K.; Rodrigues, A. M.; McCrea, A.; Vaandering, E.

    2015-12-01

    The successful exploitation of multicore processor architectures is a key element of the LHC distributed computing system in the coming era of the LHC Run 2. High-pileup complex-collision events represent a challenge for the traditional sequential programming in terms of memory and processing time budget. The CMS data production and processing framework is introducing the parallel execution of the reconstruction and simulation algorithms to overcome these limitations. CMS plans to execute multicore jobs while still supporting singlecore processing for other tasks difficult to parallelize, such as user analysis. The CMS strategy for job management thus aims at integrating single and multicore job scheduling across the Grid. This is accomplished by employing multicore pilots with internal dynamic partitioning of the allocated resources, capable of running payloads of various core counts simultaneously. An extensive test programme has been conducted to enable multicore scheduling with the various local batch systems available at CMS sites, with the focus on the Tier-0 and Tier-1s, responsible during 2015 of the prompt data reconstruction. Scale tests have been run to analyse the performance of this scheduling strategy and ensure an efficient use of the distributed resources. This paper presents the evolution of the CMS job management and resource provisioning systems in order to support this hybrid scheduling model, as well as its deployment and performance tests, which will enable CMS to transition to a multicore production model for the second LHC run.

  2. Evolution of CMS Workload Management Towards Multicore Job Support

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perez-Calero Yzquierdo, A.; Hernández, J. M.; Khan, F. A.

    The successful exploitation of multicore processor architectures is a key element of the LHC distributed computing system in the coming era of the LHC Run 2. High-pileup complex-collision events represent a challenge for the traditional sequential programming in terms of memory and processing time budget. The CMS data production and processing framework is introducing the parallel execution of the reconstruction and simulation algorithms to overcome these limitations. CMS plans to execute multicore jobs while still supporting singlecore processing for other tasks difficult to parallelize, such as user analysis. The CMS strategy for job management thus aims at integrating single andmore » multicore job scheduling across the Grid. This is accomplished by employing multicore pilots with internal dynamic partitioning of the allocated resources, capable of running payloads of various core counts simultaneously. An extensive test programme has been conducted to enable multicore scheduling with the various local batch systems available at CMS sites, with the focus on the Tier-0 and Tier-1s, responsible during 2015 of the prompt data reconstruction. Scale tests have been run to analyse the performance of this scheduling strategy and ensure an efficient use of the distributed resources. This paper presents the evolution of the CMS job management and resource provisioning systems in order to support this hybrid scheduling model, as well as its deployment and performance tests, which will enable CMS to transition to a multicore production model for the second LHC run.« less

  3. Job sharing in clinical nutrition management: a plan for successful implementation.

    PubMed

    Visocan, B J; Herold, L S; Mulcahy, M J; Schlosser, M F

    1993-10-01

    While women continue to enter the American work force in record numbers; many experience difficulty in juggling career and family obligations. Flexible scheduling is one option used to ease work and family pressures. Women's changing work roles have potentially noteworthy implications for clinical nutrition management, a traditionally female-dominated profession where the recruitment and retention of valued, experienced registered dietitians can prove to be a human resources challenge. Job sharing, one type of flexible scheduling, is applicable to the nutrition management arena. This article describes and offers a plan for overcoming obstacles to job sharing, including determining feasibility, gaining support of top management, establishing program design, announcing the job share program, and using implementation, monitoring, and fine-tuning strategies. Benefits that can be derived from a successful job share are reduced absenteeism, decreased turnover, enhanced recruitment, improved morale, increased productivity, improved job coverage, and enhanced skills and knowledge base. A case study illustrates one method for achieving job sharing success in clinical nutrition management.

  4. Shift schedules, work factors, and mental health among onshore and offshore workers in the Norwegian petroleum industry

    PubMed Central

    BERTHELSEN, Mona; PALLESEN, Ståle; BJORVATN, Bjørn; KNARDAHL, Stein

    2015-01-01

    The purpose of the present study was to answer the following research questions: (1) Do workers in different shift schedules differ in mental distress? (2) Do workers in different shift schedules differ in neuroticism? (3) Do shift schedules differ in psychosocial work exposures? (4) Do psychosocial work exposures contribute to mental distress among onshore- and offshore workers? (5) Does neuroticism confound the association between work exposures and mental distress? Workers on six shift-schedules answered a questionnaire (1,471 of 2,628 employees). Psychological and social work factors were measured by QPSNordic, mental distress was measured by HADS and neuroticism was measured by EPQ. The results showed 1) No differences in mental distress between workers in different shift schedules, 2) Revolving-shift workers reported higher neuroticism compared to day workers, 3) Swing-shift workers and revolving-shift workers reported lower job control compared to permanent-night and -day workers, 4) Job demands and role conflict were associated with more mental distress. Job control, role clarity, support, and leadership were associated with lower mental distress, 5) Neuroticism influenced the relationship between psychosocial work factors and mental distress. The present study did not find differences in mental distress between shift schedules. Job characteristics may be contributing factors when determining health effects of shift work. PMID:25740007

  5. Shift schedules, work factors, and mental health among onshore and offshore workers in the Norwegian petroleum industry.

    PubMed

    Berthelsen, Mona; Pallesen, Ståle; Bjorvatn, Bjørn; Knardahl, Stein

    2015-01-01

    The purpose of the present study was to answer the following research questions: (1) Do workers in different shift schedules differ in mental distress? (2) Do workers in different shift schedules differ in neuroticism? (3) Do shift schedules differ in psychosocial work exposures? (4) Do psychosocial work exposures contribute to mental distress among onshore- and offshore workers? (5) Does neuroticism confound the association between work exposures and mental distress? Workers on six shift-schedules answered a questionnaire (1,471 of 2,628 employees). Psychological and social work factors were measured by QPSNordic, mental distress was measured by HADS and neuroticism was measured by EPQ. The results showed 1) No differences in mental distress between workers in different shift schedules, 2) Revolving-shift workers reported higher neuroticism compared to day workers, 3) Swing-shift workers and revolving-shift workers reported lower job control compared to permanent-night and -day workers, 4) Job demands and role conflict were associated with more mental distress. Job control, role clarity, support, and leadership were associated with lower mental distress, 5) Neuroticism influenced the relationship between psychosocial work factors and mental distress. The present study did not find differences in mental distress between shift schedules. Job characteristics may be contributing factors when determining health effects of shift work.

  6. The MICRO-BOSS scheduling system: Current status and future efforts

    NASA Technical Reports Server (NTRS)

    Sadeh, Norman M.

    1993-01-01

    In this paper, a micro-opportunistic approach to factory scheduling was described that closely monitors the evolution of bottlenecks during the construction of the schedule, and continuously redirects search towards the bottleneck that appears to be most critical. This approach differs from earlier opportunistic approaches, as it does not require scheduling large resource subproblems or large job subproblems before revising the current scheduling strategy. This micro-opportunistic approach was implemented in the context of the MICRO-BOSS factory scheduling system. A study comparing MICRO-BOSS against a macro-opportunistic scheduler suggests that the additional flexibility of the micro-opportunistic approach to scheduling generally yields important reductions in both tardiness and inventory.

  7. Task Scheduling in Desktop Grids: Open Problems

    NASA Astrophysics Data System (ADS)

    Chernov, Ilya; Nikitina, Natalia; Ivashko, Evgeny

    2017-12-01

    We survey the areas of Desktop Grid task scheduling that seem to be insufficiently studied so far and are promising for efficiency, reliability, and quality of Desktop Grid computing. These topics include optimal task grouping, "needle in a haystack" paradigm, game-theoretical scheduling, domain-imposed approaches, special optimization of the final stage of the batch computation, and Enterprise Desktop Grids.

  8. Linking search space structure, run-time dynamics, and problem difficulty : a step toward demystifying tabu search.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitley, L. Darrell; Howe, Adele E.; Watson, Jean-Paul

    2004-09-01

    Tabu search is one of the most effective heuristics for locating high-quality solutions to a diverse array of NP-hard combinatorial optimization problems. Despite the widespread success of tabu search, researchers have a poor understanding of many key theoretical aspects of this algorithm, including models of the high-level run-time dynamics and identification of those search space features that influence problem difficulty. We consider these questions in the context of the job-shop scheduling problem (JSP), a domain where tabu search algorithms have been shown to be remarkably effective. Previously, we demonstrated that the mean distance between random local optima and the nearestmore » optimal solution is highly correlated with problem difficulty for a well-known tabu search algorithm for the JSP introduced by Taillard. In this paper, we discuss various shortcomings of this measure and develop a new model of problem difficulty that corrects these deficiencies. We show that Taillard's algorithm can be modeled with high fidelity as a simple variant of a straightforward random walk. The random walk model accounts for nearly all of the variability in the cost required to locate both optimal and sub-optimal solutions to random JSPs, and provides an explanation for differences in the difficulty of random versus structured JSPs. Finally, we discuss and empirically substantiate two novel predictions regarding tabu search algorithm behavior. First, the method for constructing the initial solution is highly unlikely to impact the performance of tabu search. Second, tabu tenure should be selected to be as small as possible while simultaneously avoiding search stagnation; values larger than necessary lead to significant degradations in performance.« less

  9. Transit scheduling: Basic and advanced manuals. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pine, R.; Niemeyer, J.; Chisholm, R.

    1998-12-01

    This manual will be of interest to new transit schedulers, experienced schedulers, transit planners, operating staff, and others who need to be conversant with the scheduling process. The materials clearly describe all steps in the bus and light rail scheduling process, under TCRP Project A-11, Transit Scheduling: A Manual with Materials, research was undertaken by Transportation Management and Design of Solana Beach, California, to prepare a transit scheduling manual that incorporates modern training techniques for bus and light rail transit scheduling. The manual consists of two sections: a basic treatment and an advanced section. The basic-level section is in anmore » instructional format designed primarily for novice schedulers and other transit staff. The advance section covers more complex scheduling requirements. Each section may be used sequentially or independently and is designed to integrate with agency apprenticeship and on-the-job training.« less

  10. Technical and Occupational Shops. Volume II.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    The layouts and specifications provided are intended as a guide to school boards, educators, and architects. Drawings and room plans illustrate specifications for girls' occupational shop, graphic arts, carpentry (millwork and building construction shop), boys' occupational shop (mechanical), boys' occupational shop (building construction),…

  11. Job compensable factors and factor weights derived from job analysis data.

    PubMed

    Chi, Chia-Fen; Chang, Tin-Chang; Hsia, Ping-Ling; Song, Jen-Chieh

    2007-06-01

    Government data on 1,039 job titles in Taiwan were analyzed to assess possible relationships between job attributes and compensation. For each job title, 79 specific variables in six major classes (required education and experience, aptitude, interest, work temperament, physical demands, task environment) were coded to derive the statistical predictors of wage for managers, professionals, technical, clerical, service, farm, craft, operatives, and other workers. Of the 79 variables, only 23 significantly related to pay rate were subjected to a factor and multiple regression analysis for predicting monthly wages. Given the heterogeneous nature of collected job titles, a 4-factor solution (occupational knowledge and skills, human relations skills, work schedule hardships, physical hardships) explaining 43.8% of the total variance but predicting only 23.7% of the monthly pay rate was derived. On the other hand, multiple regression with 9 job analysis items (required education, professional training, professional certificate, professional experience, coordinating, leadership and directing, demand on hearing, proportion of shift working indoors, outdoors and others, rotating shift) better predicted pay and explained 32.5% of the variance. A direct comparison of factors and subfactors of job evaluation plans indicated mental effort and responsibility (accountability) had not been measured with the current job analysis data. Cross-validation of job evaluation factors and ratings with the wage rates is required to calibrate both.

  12. Working in the margins women's experiences of stress and occupational health problems in part-time and casual retail jobs.

    PubMed

    Zeytinogla, Isik Uurla; Seaton, M Bianca; Lillevik, Waheeda; Moruz, Josefina

    2005-01-01

    Women workers dominate the labor market of part-time and casual jobs in Canada and other industrialized countries, particularly in the retail trade and consumer services sector. However, research into the occupational health consequences of part-time and casual jobs for this large group of women workers is still in its early stages. Emerging evidence suggests that part-time and casual jobs contribute to stress and result in health problems for women. To learn about the impact of part-time and casual jobs on women's experiences of stress and their resulting physical and emotional health, we conducted interviews and focus groups with occupational health and safety union representatives and female workers in retail and consumer services. Results show that stress is a major occupational health problem for these women, due to the working conditions in part-time and casual jobs, the psychosocial work environment, and the gendered work environment in the retail trade and consumer services. Stress from part-time and casual jobs results in repetitive strain injuries, migraine headaches, and feelings of low self-esteem, low motivation, and job dissatisfaction for women. The disconcerting implication of our research is that part-time and casual employment comes at a cost for some women.

  13. Analyzing data flows of WLCG jobs at batch job level

    NASA Astrophysics Data System (ADS)

    Kuehn, Eileen; Fischer, Max; Giffels, Manuel; Jung, Christopher; Petzold, Andreas

    2015-05-01

    With the introduction of federated data access to the workflows of WLCG, it is becoming increasingly important for data centers to understand specific data flows regarding storage element accesses, firewall configurations, as well as the scheduling of batch jobs themselves. As existing batch system monitoring and related system monitoring tools do not support measurements at batch job level, a new tool has been developed and put into operation at the GridKa Tier 1 center for monitoring continuous data streams and characteristics of WLCG jobs and pilots. Long term measurements and data collection are in progress. These measurements already have been proven to be useful analyzing misbehaviors and various issues. Therefore we aim for an automated, realtime approach for anomaly detection. As a requirement, prototypes for standard workflows have to be examined. Based on measurements of several months, different features of HEP jobs are evaluated regarding their effectiveness for data mining approaches to identify these common workflows. The paper will introduce the actual measurement approach and statistics as well as the general concept and first results classifying different HEP job workflows derived from the measurements at GridKa.

  14. [Twisting and turning; the development of the Dutch science shops].

    PubMed

    Lursen, M; Mulder, H; Lieshout, M

    2000-01-01

    The concept of science shops (Wetenschapswinkels) originates from the Netherlands. Science shops were based on the idea that universities had to play a more prominent role in the solution of social problems - an outcome of the discussion, initiated by students, on the democratisation of universities in the early 1970s. Starting as voluntary student organisations supported by individual staff members from the universities, they were devoted to give oppressed minority groups and the financially weak access to scientific research. Slowly, acknowledgement came. Science shops began to receive financial support from university boards. Support also came from the Dutch government. By now science shops have professionalized and most of them are well embedded in their universities. Many developments within society and the universities influenced the work and structure of the science shops. Positive developments were professionalization, growth, becoming embedded, and the introduction of new research themes. There were also negative developments, such as budget cuts and the fact that 'service to society' ceased to be a government objective for the universities. These led to recurring struggles for survival, which were not always won. Interest in the science shop concept has grown in other countries over the last years. In the 1980s, the system spread within Western Europe. Similar activities, based on the Dutch model, have started in North America and Eastern Europe in the 1990s. The activities on the international level led to an E.U. financial project to prepare an international network of science shops, which commenced in 1999. With information exchange and international cooperation as its major goals, the network will create new opportunties for the future.

  15. Job stress and job satisfaction among new graduate nurses during the first year of employment in Taiwan.

    PubMed

    Cheng, Ching-Yu; Liou, Shwu-Ru; Tsai, Hsiu-Min; Chang, Chia-Hao

    2015-08-01

    Nurse graduates are leaving their first employment at an alarming rate. The purpose of this study was to explore the relationships between job stress, job satisfaction and related factors over time among these nurses. This study applied a longitudinal design with three follow-ups after nurse graduates' first employment began. Using convenience sampling, participants were 206 new graduates from a university. The Work Environment Nursing Satisfaction Survey and the Clinical Stress Scale were used in this study. Results indicated that job stress remained moderate across three time points. Participants working 12 h shifts exhibited less job stress. Job satisfaction significantly increased in the twelfth month. Participants working 12 h shifts had a higher degree of job satisfaction. Job stress was negatively correlated with job satisfaction. The 12 h work shifts were related to job stress and job satisfaction. These results implied that health-care administrators need to provide longer orientation periods and flexible shift schedules for new graduate nurses to adapt to their work environment. © 2014 Wiley Publishing Asia Pty Ltd.

  16. On-Line Scheduling of Parallel Machines

    DTIC Science & Technology

    1990-11-01

    machine without losing any work; this is referred to as the preemptive model. In contrast to the nonpreemptive model which we have considered in this paper...that there exists no schedule of length d. The 2-relaxed decision procedure is as follows. Put each job into the queue of the slowest machine Mk such...in their queues . If a machine’s queue is empty it takes jobs to process from the queue of the first machine that is slower than it and that has a

  17. A new technology for manufacturing scheduling derived from space system operations

    NASA Technical Reports Server (NTRS)

    Hornstein, R. S.; Willoughby, J. K.

    1993-01-01

    A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

  18. Shopping with Acquired Brain Injuries, Coping Strategies and Maslowian Principles.

    PubMed

    Andersson, Jonas E; Skehan, Terry; Rydén, Monica; Lagerkrans, Elisabeth

    2016-01-01

    A positive outcome of the modern welfare state is prolonged life expectancy. In Sweden, the expected life span has increased with approximatively 25 years during the 20th century [Statistics Sweden]. However, ageing is associated with an increased risk for acquiring cognitive and physical disabilities. This study is based on anonymized interviews with groups of older persons who experience cognitive problems and relatives. The interviewees were asked about everyday activities like shopping groceries, clothes or other necessities. The interviewees identified problems and described a series of strategies for coping. This paper uses fictionalized characters to present problems and coping strategies that the interviewees use to overcome cognitive challenges when shopping groceries. The strategies range from complete withdrawal, an increased dependency on proxies to the development of elaborate techniques to mask their problem and obtain assistance. Following the current trend in the design of the Swedish sales environment - large scale, abundance of goods and Maslowian strategies for making people stay longer (and spend more money) - accessibility in the built environment is often an absent friend.

  19. The Impact of Job Stress and Job Satisfaction on Workforce Productivity in an Iranian Petrochemical Industry.

    PubMed

    Hoboubi, Naser; Choobineh, Alireza; Kamari Ghanavati, Fatemeh; Keshavarzi, Sareh; Akbar Hosseini, Ali

    2017-03-01

    Job stress and job satisfaction are important factors affecting workforce productivity. This study was carried out to investigate the job stress, job satisfaction, and workforce productivity levels, to examine the effects of job stress and job satisfaction on workforce productivity, and to identify factors associated with productivity decrement among employees of an Iranian petrochemical industry. In this study, 125 randomly selected employees of an Iranian petrochemical company participated. The data were collected using the demographic questionnaire, Osipow occupational stress questionnaire to investigate the level of job stress, Job Descriptive Index to examine job satisfaction, and Hersey and Goldsmith questionnaire to investigate productivity in the study population. The levels of employees' perceived job stress and job satisfaction were moderate-high and moderate, respectively. Also, their productivity was evaluated as moderate. Although the relationship between job stress and productivity indices was not statistically significant, the positive correlation between job satisfaction and productivity indices was statistically significant. The regression modeling demonstrated that productivity was significantly associated with shift schedule, the second and the third dimensions of job stress (role insufficiency and role ambiguity), and the second dimension of job satisfaction (supervision). Corrective measures are necessary to improve the shift work system. "Role insufficiency" and "role ambiguity" should be improved and supervisor support must be increased to reduce job stress and increase job satisfaction and productivity.

  20. An Optimizing Space Data-Communications Scheduling Method and Algorithm with Interference Mitigation, Generalized for a Broad Class of Optimization Problems

    NASA Technical Reports Server (NTRS)

    Rash, James L.

    2010-01-01

    NASA's space data-communications infrastructure, the Space Network and the Ground Network, provide scheduled (as well as some limited types of unscheduled) data-communications services to user spacecraft via orbiting relay satellites and ground stations. An implementation of the methods and algorithms disclosed herein will be a system that produces globally optimized schedules with not only optimized service delivery by the space data-communications infrastructure but also optimized satisfaction of all user requirements and prescribed constraints, including radio frequency interference (RFI) constraints. Evolutionary search, a class of probabilistic strategies for searching large solution spaces, constitutes the essential technology in this disclosure. Also disclosed are methods and algorithms for optimizing the execution efficiency of the schedule-generation algorithm itself. The scheduling methods and algorithms as presented are adaptable to accommodate the complexity of scheduling the civilian and/or military data-communications infrastructure. Finally, the problem itself, and the methods and algorithms, are generalized and specified formally, with applicability to a very broad class of combinatorial optimization problems.

  1. Smuggling and cross border shopping of tobacco in Europe.

    PubMed

    Joossens, L; Raw, M

    1995-05-27

    Governments have recently become concerned about cross border shopping and smuggling because it can decrease tax revenue. The tobacco industry predicted that, with the removal of border controls in the European Union, price differences between neighbouring countries would lead to a diversion of tobacco trade, legally and illegally, to countries with cheaper cigarettes. According to them this diversion would be through increased cross border shopping for personal consumption or through increased smuggling of cheap cigarettes from countries with low tax to countries with high tax, where cigarettes are more expensive. These arguments have been used to urge governments not to increase tax on tobacco products. The evidence suggests, however, that cross border shopping is not yet a problem in Europe and that smuggling is not of cheap cigarettes to expensive countries. Instead, more expensive "international" brands are smuggled into northern Europe and sold illegally on the streets of the cheaper countries of southern Europe.

  2. Smuggling and cross border shopping of tobacco in Europe.

    PubMed Central

    Joossens, L.; Raw, M.

    1995-01-01

    Governments have recently become concerned about cross border shopping and smuggling because it can decrease tax revenue. The tobacco industry predicted that, with the removal of border controls in the European Union, price differences between neighbouring countries would lead to a diversion of tobacco trade, legally and illegally, to countries with cheaper cigarettes. According to them this diversion would be through increased cross border shopping for personal consumption or through increased smuggling of cheap cigarettes from countries with low tax to countries with high tax, where cigarettes are more expensive. These arguments have been used to urge governments not to increase tax on tobacco products. The evidence suggests, however, that cross border shopping is not yet a problem in Europe and that smuggling is not of cheap cigarettes to expensive countries. Instead, more expensive "international" brands are smuggled into northern Europe and sold illegally on the streets of the cheaper countries of southern Europe. PMID:7787549

  3. Testing Task Schedulers on Linux System

    NASA Astrophysics Data System (ADS)

    Jelenković, Leonardo; Groš, Stjepan; Jakobović, Domagoj

    Testing task schedulers on Linux operating system proves to be a challenging task. There are two main problems. The first one is to identify which properties of the scheduler to test. The second problem is how to perform it, e.g., which API to use that is sufficiently precise and in the same time supported on most platforms. This paper discusses the problems in realizing test framework for testing task schedulers and presents one potential solution. Observed behavior of the scheduler is the one used for “normal” task scheduling (SCHED_OTHER), unlike one used for real-time tasks (SCHED_FIFO, SCHED_RR).

  4. Job-related resources and the pressures of working life.

    PubMed

    Schieman, Scott

    2013-03-01

    Data from a 2011 representative sample of Canadian workers are used to test the resource versus the stress of higher status hypotheses. Drawing on the Job Demands-Resources model (JD-R), the resource hypothesis predicts that job-related resources reduce job pressure. The stress of higher status hypothesis predicts that job-related resources increase job pressure. Findings tend to favor the resource hypothesis for job autonomy and schedule control, while supporting the stress of higher status for job authority and challenging work. These findings help elaborate on the "resource" concept in the JD-R model and identify unique ways that such resources might contribute to the pressures of working life. Copyright © 2012 Elsevier Inc. All rights reserved.

  5. Decomposability and scalability in space-based observatory scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.

    1992-01-01

    In this paper, we discuss issues of problem and model decomposition within the HSTS scheduling framework. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) scheduling problem, motivated by the limitations of the current solution and, more generally, the insufficiency of classical planning and scheduling approaches in this problem context. We first summarize the salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research. Then, we describe some key problem decomposition techniques supported by HSTS and underlying our integrated planning and scheduling approach, and we discuss the leverage they provide in solving space-based observatory scheduling problems.

  6. DTS: Building custom, intelligent schedulers

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1994-01-01

    DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

  7. A Multi-Objective Compounded Local Mobile Cloud Architecture Using Priority Queues to Process Multiple Jobs.

    PubMed

    Wei, Xiaohui; Sun, Bingyi; Cui, Jiaxu; Xu, Gaochao

    2016-01-01

    As a result of the greatly increased use of mobile devices, the disadvantages of portable devices have gradually begun to emerge. To solve these problems, the use of mobile cloud computing assisted by cloud data centers has been proposed. However, cloud data centers are always very far from the mobile requesters. In this paper, we propose an improved multi-objective local mobile cloud model: Compounded Local Mobile Cloud Architecture with Dynamic Priority Queues (LMCpri). This new architecture could briefly store jobs that arrive simultaneously at the cloudlet in different priority positions according to the result of auction processing, and then execute partitioning tasks on capable helpers. In the Scheduling Module, NSGA-II is employed as the scheduling algorithm to shorten processing time and decrease requester cost relative to PSO and sequential scheduling. The simulation results show that the number of iteration times that is defined to 30 is the best choice of the system. In addition, comparing with LMCque, LMCpri is able to effectively accommodate a requester who would like his job to be executed in advance and shorten execution time. Finally, we make a comparing experiment between LMCpri and cloud assisting architecture, and the results reveal that LMCpri presents a better performance advantage than cloud assisting architecture.

  8. A Multi-Objective Compounded Local Mobile Cloud Architecture Using Priority Queues to Process Multiple Jobs

    PubMed Central

    Wei, Xiaohui; Sun, Bingyi; Cui, Jiaxu; Xu, Gaochao

    2016-01-01

    As a result of the greatly increased use of mobile devices, the disadvantages of portable devices have gradually begun to emerge. To solve these problems, the use of mobile cloud computing assisted by cloud data centers has been proposed. However, cloud data centers are always very far from the mobile requesters. In this paper, we propose an improved multi-objective local mobile cloud model: Compounded Local Mobile Cloud Architecture with Dynamic Priority Queues (LMCpri). This new architecture could briefly store jobs that arrive simultaneously at the cloudlet in different priority positions according to the result of auction processing, and then execute partitioning tasks on capable helpers. In the Scheduling Module, NSGA-II is employed as the scheduling algorithm to shorten processing time and decrease requester cost relative to PSO and sequential scheduling. The simulation results show that the number of iteration times that is defined to 30 is the best choice of the system. In addition, comparing with LMCque, LMCpri is able to effectively accommodate a requester who would like his job to be executed in advance and shorten execution time. Finally, we make a comparing experiment between LMCpri and cloud assisting architecture, and the results reveal that LMCpri presents a better performance advantage than cloud assisting architecture. PMID:27419854

  9. Job Redesign: An Analysis of an Intervention to Improve Job Characteristics

    DTIC Science & Technology

    1989-09-01

    vii I. Introduction . . . . . . . . . . . 1 General Issue ... . I Specific Problem . .. . . . I Research Objectives . . . . . 2...the Job Diagnostic Survey, the Minnesota Satisfaction Questionnaire and ad-hoc items pertaining to the issues of training, challenge, and the matrix...vii JOB REDESIGN: AN ANALYSIS OF AN INTERVENTION TO IMPROVE JOB CHARACTERISTICS I. Introduction General Issue This tnesis will center on whether job

  10. The Boston Safe Shops Project--preliminary findings of a case study in applying the 10 essential services of public health to building environmental health capacity.

    PubMed

    Shoemaker, Paul A; Skogstrom, Tiffany; Shea, John; Bethune, Leon

    2007-01-01

    Boston's more than 500 automotive shops, located primarily in low-income communities of color, are a source both of well-paying jobs and of potential hazardous exposures to employees and residents. The Safe Shops Project works to reduce occupational and environmental health hazards without having to close these businesses. Combining inspections, in-shop trainings, outreach, and technical/financial assistance, it brings shops into compliance with laws and promotes use of safer practices and alternative products. After 18 months, 254 workers at 61 of 124 participating shops had received training. Surveys showed improved worker knowledge: Pre-training, 24.2 percent of the worker survey respondents stated that they knew what an MSDS was, and post-training, 75 percent stated that they knew. The surveys also found improvement in work practices: Pre-training, 48 percent of workers indicated that they used safety goggles in their work, while post-training, 70 percent indicated proper use of safety goggles. The results also showed shops investing in capital improvements such as replacement of PCE-based brake cleaners with aqueous cleaners. The Safe Shops Project has a successfully modeled application of the 10-essential-services framework to the building of public health capacity and community collaboration, and this model can be adapted to other locations and industries.

  11. Selecting and implementing the PBS scheduler on an SGI Onyx 2/Orgin 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bittner, S.

    1999-06-28

    In the Mathematics and Computer Science Division at Argonne, the demand for resources on the Onyx 2 exceeds the resources available for consumption. To distribute these scarce resources effectively, we need a scheduling and resource management package with multiple capabilities. In particular, it must accept standard interactive user logins, allow batch jobs, backfill the system based on available resources, and permit system activities such as accounting to proceed without interruption. The package must include a mechanism to treat the graphic pipes as a schedulable resource. Also required is the ability to create advance reservations, offer dedicated system modes for largemore » resource runs and benchmarking, and track the resources consumed for each job run. Furthermore, our users want to be able to obtain repeatable timing results on job runs. And, of course, package costs must be carefully considered. We explored several options, including NQE and various third-party products, before settling on the PBS scheduler.« less

  12. Shopping. Teaching Guide.

    ERIC Educational Resources Information Center

    Florida Univ., Gainesville. Florida Cooperative Extension Service.

    One in a series of consumer education materials for 4-H Club members and secondary students, this document focuses on shopping and purchasing. The series is based on the philosophy that teens need the training and guidance to develop the skills needed to become competent consumers. The shopping project is designed to acquaint students with some of…

  13. An Optimizing Space Data-Communications Scheduling Method and Algorithm with Interference Mitigation, Generalized for a Broad Class of Optimization Problems

    NASA Technical Reports Server (NTRS)

    Rash, James

    2014-01-01

    NASA's space data-communications infrastructure-the Space Network and the Ground Network-provide scheduled (as well as some limited types of unscheduled) data-communications services to user spacecraft. The Space Network operates several orbiting geostationary platforms (the Tracking and Data Relay Satellite System (TDRSS)), each with its own servicedelivery antennas onboard. The Ground Network operates service-delivery antennas at ground stations located around the world. Together, these networks enable data transfer between user spacecraft and their mission control centers on Earth. Scheduling data-communications events for spacecraft that use the NASA communications infrastructure-the relay satellites and the ground stations-can be accomplished today with software having an operational heritage dating from the 1980s or earlier. An implementation of the scheduling methods and algorithms disclosed and formally specified herein will produce globally optimized schedules with not only optimized service delivery by the space data-communications infrastructure but also optimized satisfaction of all user requirements and prescribed constraints, including radio frequency interference (RFI) constraints. Evolutionary algorithms, a class of probabilistic strategies for searching large solution spaces, is the essential technology invoked and exploited in this disclosure. Also disclosed are secondary methods and algorithms for optimizing the execution efficiency of the schedule-generation algorithms themselves. The scheduling methods and algorithms as presented are adaptable to accommodate the complexity of scheduling the civilian and/or military data-communications infrastructure within the expected range of future users and space- or ground-based service-delivery assets. Finally, the problem itself, and the methods and algorithms, are generalized and specified formally. The generalized methods and algorithms are applicable to a very broad class of combinatorial

  14. Firefighter Shift Schedules Affect Sleep Quality.

    PubMed

    Billings, Joel; Focht, Will

    2016-03-01

    The aim of this study was to investigate the prevalence and severity of firefighter sleep quality across department shift schedules. Sleep quality was assessed using a Pittsburgh Sleep Quality Index in a sample of 109 male career firefighters from six fire departments in three Southwestern US states. The three shift schedules studied were 24on/48off, 48on/96off, and Kelly. Seventy-three percent of firefighters report poor sleep quality. The 24on/48off shift schedule is associated with the best sleep quality and Kelly is associated with the worst sleep quality. Firefighters working second jobs report significantly poorer sleep quality than those who do not. Shift schedules that disrupt normal circadian rhythms more result in poorer sleep quality, which can lead to less effective emergency response and increased risk to firefighter health and safety.

  15. Job attitudes of airway facilities personnel.

    DOT National Transportation Integrated Search

    1977-08-01

    A total of 2,366 employees of the Airway Facilities (AF) Service responded to a detailed questionnaire concerning job satisfaction and such factors as salary, shift schedule, workload, and geographic location. : In general, AF employees reported sati...

  16. SOFIA's Choice: Automating the Scheduling of Airborne Observations

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Norvig, Peter (Technical Monitor)

    1999-01-01

    This paper describes the problem of scheduling observations for an airborne telescope. Given a set of prioritized observations to choose from, and a wide range of complex constraints governing legitimate choices and orderings, how can we efficiently and effectively create a valid flight plan which supports high priority observations? This problem is quite different from scheduling problems which are routinely solved automatically in industry. For instance, the problem requires making choices which lead to other choices later, and contains many interacting complex constraints over both discrete and continuous variables. Furthermore, new types of constraints may be added as the fundamental problem changes. As a result of these features, this problem cannot be solved by traditional scheduling techniques. The problem resembles other problems in NASA and industry, from observation scheduling for rovers and other science instruments to vehicle routing. The remainder of the paper is organized as follows. In 2 we describe the observatory in order to provide some background. In 3 we describe the problem of scheduling a single flight. In 4 we compare flight planning and other scheduling problems and argue that traditional techniques are not sufficient to solve this problem. We also mention similar complex scheduling problems which may benefit from efforts to solve this problem. In 5 we describe an approach for solving this problem based on research into a similar problem, that of scheduling observations for a space-borne probe. In 6 we discuss extensions of the flight planning problem as well as other problems which are similar to flight planning. In 7 we conclude and discuss future work.

  17. Autobody Refinishing General Best Shop Practices

    EPA Pesticide Factsheets

    This document focuses on the key components of beneficial change in small auto refinish shops. Compiled from real-life shop experiences, the documents serve as worker protection and pollution prevention goals for the small shop.

  18. Job Grading Standard for Electric Power Controller WG-5407.

    ERIC Educational Resources Information Center

    Civil Service Commission, Washington, DC. Bureau of Policies and Standards.

    The standard is used to grade nonsupervisory jobs involved in controlling the generation or distribution of electric power. The jobs are located at power generating plants, power distribution centers, and substations. The work requires ability to anticipate load changes due to work schedules, weather, and other variables, in order to engage or cut…

  19. Machine Shop Lathes.

    ERIC Educational Resources Information Center

    Dunn, James

    This guide, the second in a series of five machine shop curriculum manuals, was designed for use in machine shop courses in Oklahoma. The purpose of the manual is to equip students with basic knowledge and skills that will enable them to enter the machine trade at the machine-operator level. The curriculum is designed so that it can be used in…

  20. Heat Treat Shop in the Technical Services Building

    NASA Image and Video Library

    1948-01-21

    A technician prepares a metal component for a high-temperature bake in the Heat Treatment Shop at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. Fabrication Division under Dan White and John Dalgleish created almost all of the equipment and models used at the laboratory. The Technical Services Building, referred to as the Fab Shop, contained a number of specialized shops in the 1940s and 1950s. These included a Machine Shop, Sheet Metal Shop, Wood and Pattern Shop, Instrument Shop, Thermocouple Shop, Heat Treating Shop, Metallurgical Laboratory, and Fabrication Office. The Metallurgical Laboratory contained a control lab for the Heat Treating Shop and a service lab for the NACA Lewis research divisions. This metallurgical group performed tensile and impact tests on metals to determine their suitability for specific research or equipment. The Heat Treating Shop heated metal parts to optimize their physical properties and contained a Precision Castings Foundry to manufacture equipment made of heat resisting alloys.

  1. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  2. On scheduling task systems with variable service times

    NASA Astrophysics Data System (ADS)

    Maset, Richard G.; Banawan, Sayed A.

    1993-08-01

    Several strategies have been proposed for developing optimal and near-optimal schedules for task systems (jobs consisting of multiple tasks that can be executed in parallel). Most such strategies, however, implicitly assume deterministic task service times. We show that these strategies are much less effective when service times are highly variable. We then evaluate two strategies—one adaptive, one static—that have been proposed for retaining high performance despite such variability. Both strategies are extensions of critical path scheduling, which has been found to be efficient at producing near-optimal schedules. We found the adaptive approach to be quite effective.

  3. Job strain, job insecurity, and health: rethinking the relationship.

    PubMed

    Strazdins, Lyndall; D'Souza, Rennie M; Lim, Lynette L-Y; Broom, Dorothy H; Rodgers, Bryan

    2004-10-01

    Job strain (high demands and low control) is a widely used measure of work stress. The authors introduce a new way of looking at work stress by combining job strain with job insecurity, a combination increasingly prevalent in contemporary economies, using data from a cross-sectional survey (N = 1,188) of mid-aged Australian managers and professionals. Those reporting both strain and insecurity showed markedly higher odds for mental and physical health problems (depression: odds ratio [OR] 13.88, 95% confidence interval [CI] 5.67-34.01; anxiety: OR 12.88, CI 5.12-32.39; physical health problems: OR 3.97, CI 1.72-9.16; and poor self-rated health: OR 7.12, CI 2.81-18.01). Job strain and insecurity showed synergistic associations with health, and employees experiencing both could be at heightened health risk.

  4. A PSO-Based Hybrid Metaheuristic for Permutation Flowshop Scheduling Problems

    PubMed Central

    Zhang, Le; Wu, Jinnan

    2014-01-01

    This paper investigates the permutation flowshop scheduling problem (PFSP) with the objectives of minimizing the makespan and the total flowtime and proposes a hybrid metaheuristic based on the particle swarm optimization (PSO). To enhance the exploration ability of the hybrid metaheuristic, a simulated annealing hybrid with a stochastic variable neighborhood search is incorporated. To improve the search diversification of the hybrid metaheuristic, a solution replacement strategy based on the pathrelinking is presented to replace the particles that have been trapped in local optimum. Computational results on benchmark instances show that the proposed PSO-based hybrid metaheuristic is competitive with other powerful metaheuristics in the literature. PMID:24672389

  5. A PSO-based hybrid metaheuristic for permutation flowshop scheduling problems.

    PubMed

    Zhang, Le; Wu, Jinnan

    2014-01-01

    This paper investigates the permutation flowshop scheduling problem (PFSP) with the objectives of minimizing the makespan and the total flowtime and proposes a hybrid metaheuristic based on the particle swarm optimization (PSO). To enhance the exploration ability of the hybrid metaheuristic, a simulated annealing hybrid with a stochastic variable neighborhood search is incorporated. To improve the search diversification of the hybrid metaheuristic, a solution replacement strategy based on the pathrelinking is presented to replace the particles that have been trapped in local optimum. Computational results on benchmark instances show that the proposed PSO-based hybrid metaheuristic is competitive with other powerful metaheuristics in the literature.

  6. Shopping for Funeral Services

    MedlinePlus

    ... advance. It allows you to comparison shop without time constraints, creates an opportunity for family discussion, and lifts some of the burden from your family. This article is part of a series: Shopping for Funeral Services Next Tagged with: Funeral ...

  7. Compiling Planning into Scheduling: A Sketch

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Crawford, James M.; Smith, David E.

    2004-01-01

    Although there are many approaches for compiling a planning problem into a static CSP or a scheduling problem, current approaches essentially preserve the structure of the planning problem in the encoding. In this pape: we present a fundamentally different encoding that more accurately resembles a scheduling problem. We sketch the approach and argue, based on an example, that it is possible to automate the generation of such an encoding for problems with certain properties and thus produce a compiler of planning into scheduling problems. Furthermore we argue that many NASA problems exhibit these properties and that such a compiler would provide benefits to both theory and practice.

  8. Production scheduling with ant colony optimization

    NASA Astrophysics Data System (ADS)

    Chernigovskiy, A. S.; Kapulin, D. V.; Noskova, E. E.; Yamskikh, T. N.; Tsarev, R. Yu

    2017-10-01

    The optimum solution of the production scheduling problem for manufacturing processes at an enterprise is crucial as it allows one to obtain the required amount of production within a specified time frame. Optimum production schedule can be found using a variety of optimization algorithms or scheduling algorithms. Ant colony optimization is one of well-known techniques to solve the global multi-objective optimization problem. In the article, the authors present a solution of the production scheduling problem by means of an ant colony optimization algorithm. A case study of the algorithm efficiency estimated against some others production scheduling algorithms is presented. Advantages of the ant colony optimization algorithm and its beneficial effect on the manufacturing process are provided.

  9. A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints

    NASA Astrophysics Data System (ADS)

    Guo, Peng; Cheng, Wenming; Wang, Yi

    2014-10-01

    The quay crane scheduling problem (QCSP) determines the handling sequence of tasks at ship bays by a set of cranes assigned to a container vessel such that the vessel's service time is minimized. A number of heuristics or meta-heuristics have been proposed to obtain the near-optimal solutions to overcome the NP-hardness of the problem. In this article, the idea of generalized extremal optimization (GEO) is adapted to solve the QCSP with respect to various interference constraints. The resulting GEO is termed the modified GEO. A randomized searching method for neighbouring task-to-QC assignments to an incumbent task-to-QC assignment is developed in executing the modified GEO. In addition, a unidirectional search decoding scheme is employed to transform a task-to-QC assignment to an active quay crane schedule. The effectiveness of the developed GEO is tested on a suite of benchmark problems introduced by K.H. Kim and Y.M. Park in 2004 (European Journal of Operational Research, Vol. 156, No. 3). Compared with other well-known existing approaches, the experiment results show that the proposed modified GEO is capable of obtaining the optimal or near-optimal solution in a reasonable time, especially for large-sized problems.

  10. Operating the production calculus: ordering a production system in the print industry.

    PubMed

    Button, Graham; Sharrock, Wes

    2002-06-01

    The topic of shop-floor work has been extensively examined within sociology. However, the organizational structures within which this work takes place have, in the most part, been taken as unexamined givens. Yet, their operation is also the shop-floor work of some people. This paper examines the way in which the stable organizational structures within which shop-floor work takes place are achieved. It is based upon a fieldwork investigation of a large commercial printer and focuses upon the collaborative work of those who are involved in scheduling the production of a job and their use of 'the production calculus' in planning the work of the site. The print industry is undergoing considerable technological change and scheduling technologies have been developed to automate this work. However, there has been little take up of these technologies and the paper also considers how the characteristics of operating the production calculus in practice may account for this.

  11. Buying cannabis in 'coffee shops'.

    PubMed

    Monshouwer, Karin; Van Laar, Margriet; Vollebergh, Wilma A

    2011-03-01

    The key objective of Dutch cannabis policy is to prevent and limit the risks of cannabis consumption for users, their direct environment and society ('harm reduction'). This paper will focus on the tolerated sale of cannabis in 'coffee shops'. We give a brief overview of Dutch policy on coffee shops, its history and recent developments. Furthermore, we present epidemiological data that may be indicative of the effects of the coffee shop policy on cannabis and other drug use. Dutch coffee shop policy has become more restrictive in recent years and the number of coffee shops has decreased. Cannabis prevalence rates in the adult population are somewhat below the European average; the rate is relatively high among adolescents; and age of first use appears to be low. On a European level, the use of hard drugs in both the Dutch adult and adolescent population is average to low (except for ecstasy among adults). International comparisons do not suggest a strong, upward effect of the coffee shop system on levels of cannabis use, although prevalence rates among Dutch adolescents give rise to concern. Furthermore, the coffee shop system appears to be successful in separating the hard and soft drugs markets. Nevertheless, in recent years, issues concerning the involvement of organised crime and the public nuisance related to drug tourism have given rise to several restrictive measures on the local level and have sparked a political debate on the reform of Dutch drug policy. © 2011 Trimbos Institute.

  12. Real Time Monitor of Grid job executions

    NASA Astrophysics Data System (ADS)

    Colling, D. J.; Martyniak, J.; McGough, A. S.; Křenek, A.; Sitera, J.; Mulač, M.; Dvořák, F.

    2010-04-01

    In this paper we describe the architecture and operation of the Real Time Monitor (RTM), developed by the Grid team in the HEP group at Imperial College London. This is arguably the most popular dissemination tool within the EGEE [1] Grid. Having been used, on many occasions including GridFest and LHC inauguration events held at CERN in October 2008. The RTM gathers information from EGEE sites hosting Logging and Bookkeeping (LB) services. Information is cached locally at a dedicated server at Imperial College London and made available for clients to use in near real time. The system consists of three main components: the RTM server, enquirer and an apache Web Server which is queried by clients. The RTM server queries the LB servers at fixed time intervals, collecting job related information and storing this in a local database. Job related data includes not only job state (i.e. Scheduled, Waiting, Running or Done) along with timing information but also other attributes such as Virtual Organization and Computing Element (CE) queue - if known. The job data stored in the RTM database is read by the enquirer every minute and converted to an XML format which is stored on a Web Server. This decouples the RTM server database from the client removing the bottleneck problem caused by many clients simultaneously accessing the database. This information can be visualized through either a 2D or 3D Java based client with live job data either being overlaid on to a 2 dimensional map of the world or rendered in 3 dimensions over a globe map using OpenGL.

  13. Concurrent Reinforcement Schedules for Problem Behavior and Appropriate Behavior: Experimental Applications of the Matching Law

    ERIC Educational Resources Information Center

    Borrero, Carrie S. W.; Vollmer, Timothy R.; Borrero, John C.; Bourret, Jason C.; Sloman, Kimberly N.; Samaha, Andrew L.; Dallery, Jesse

    2010-01-01

    This study evaluated how children who exhibited functionally equivalent problem and appropriate behavior allocate responding to experimentally arranged reinforcer rates. Relative reinforcer rates were arranged on concurrent variable-interval schedules and effects on relative response rates were interpreted using the generalized matching equation.…

  14. Analysis of Application Power and Schedule Composition in a High Performance Computing Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elmore, Ryan; Gruchalla, Kenny; Phillips, Caleb

    As the capacity of high performance computing (HPC) systems continues to grow, small changes in energy management have the potential to produce significant energy savings. In this paper, we employ an extensive informatics system for aggregating and analyzing real-time performance and power use data to evaluate energy footprints of jobs running in an HPC data center. We look at the effects of algorithmic choices for a given job on the resulting energy footprints, and analyze application-specific power consumption, and summarize average power use in the aggregate. All of these views reveal meaningful power variance between classes of applications as wellmore » as chosen methods for a given job. Using these data, we discuss energy-aware cost-saving strategies based on reordering the HPC job schedule. Using historical job and power data, we present a hypothetical job schedule reordering that: (1) reduces the facility's peak power draw and (2) manages power in conjunction with a large-scale photovoltaic array. Lastly, we leverage this data to understand the practical limits on predicting key power use metrics at the time of submission.« less

  15. 30 CFR 57.4532 - Blacksmith shops.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Blacksmith shops. 57.4532 Section 57.4532 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Control Installation/construction/maintenance § 57.4532 Blacksmith shops. Blacksmith shops located on the...

  16. 30 CFR 57.4532 - Blacksmith shops.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Blacksmith shops. 57.4532 Section 57.4532 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Control Installation/construction/maintenance § 57.4532 Blacksmith shops. Blacksmith shops located on the...

  17. 30 CFR 57.4532 - Blacksmith shops.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Blacksmith shops. 57.4532 Section 57.4532 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Control Installation/construction/maintenance § 57.4532 Blacksmith shops. Blacksmith shops located on the...

  18. 30 CFR 57.4532 - Blacksmith shops.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Blacksmith shops. 57.4532 Section 57.4532 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Control Installation/construction/maintenance § 57.4532 Blacksmith shops. Blacksmith shops located on the...

  19. Community College Students Need Fair Job Scheduling Practices. Fact Sheet #C420

    ERIC Educational Resources Information Center

    Reichlin, Lindsey; Gault, Barbara

    2014-01-01

    This paper discusses the challenges that community college students face as a result of holding a job while pursuing a postsecondary education. Working is often critical to community college students' ability to pursue a postsecondary education, but holding a job while in school can threaten a student's success in college. For students to succeed…

  20. 30 CFR 75.343 - Underground shops.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground shops. 75.343 Section 75.343... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Ventilation § 75.343 Underground shops. (a) Underground shops shall be equipped with an automatic fire suppression system meeting the requirements of § 75.1107...