Sample records for joint operation planning

  1. Joint operations planning for space surveillance missions on the MSX satellite

    NASA Technical Reports Server (NTRS)

    Stokes, Grant; Good, Andrew

    1994-01-01

    The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a

  2. Strategic Planning to Conduct Joint Force Network Operations: A Content Analysis of NETOPS Organizations Strategic Plans

    DTIC Science & Technology

    2007-03-01

    information dominance , Joint Network Operations (NETOPS) organizations need to be strategically aligned. As result, to enhance the capabilities-based effects of NETOPS and reduce our NETOP infrastructures susceptibility to compromise. Once the key organizations were identified, their strategic plans were analyzed using a structured content analysis framework. The results illustrated that the strategic plans were aligned with the community of interests tasking to conduct NETOPS. Further research is required into the strategic alignment beyond the strategic

  3. Planning and conducting medical support to joint operations.

    PubMed

    Hughes, A S

    2000-01-01

    Operations are core business for all of us and the PJHQ medical cell is at the heart of this process. With the likelihood of a continuing UK presence in the Balkans for some time to come, the challenge of meeting this and any other new operational commitments will continue to demand a flexible and innovative approach from all concerned. These challenges together with the Joint and multinational aspects of the job make the PJHQ medical cell a demanding but rewarding place to work and provide a valuable Joint staff training opportunity for the RNMS.

  4. Apollo Soyuz mission planning and operations

    NASA Technical Reports Server (NTRS)

    Frank, M. P., III

    1976-01-01

    The paper describes the Apollo Soyuz project from the points of view of working group organization, mission plan definition, joint operations concept, and mission preparation. The concept for joint operations considered contingency situations as well as nominal operations. Preparations for the joint flight included cooperative tracking tests and combined training of the flight crews and mission control personnel.

  5. Searching for Order Within Chaos: Complexity Theorys Implications to Intelligence Support During Joint Operational Planning

    DTIC Science & Technology

    2017-06-09

    structures constantly arise in firefights and skirmishes on the battlefield. Source: Andrew Ilachinski, Artificial War: Multiagent- Based Simulation of...Alternative Methods of Analysis and Innovative Organizational Structures .” Conference, Rome, Italy March 31-April 2. ...Intelligence Analysis, Joint Operational Planning, Cellular Automata, Agent- Based Modeling 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT 18

  6. Space Weather Forecasting at the Joint Space Operations Center (JSpOC)

    NASA Astrophysics Data System (ADS)

    Nava, O.

    2012-12-01

    The Joint Space Operations Center (JSpOC) at Vandenberg Air Force Base is the command and control focal point for the operational employment of worldwide joint space forces. The JSpOC focuses on planning and executing US Strategic Command's Joint Functional Component Command for Space (JFCC SPACE) mission. Through the JSpOC, the Weather Specialty Team (WST) monitors space and terrestrial weather effects, plans and assesses weather impacts on military operations, and provides reach-back support for deployed theater solar and terrestrial needs. This presentation will detail how space weather affects the JSpOC mission set and how the scientific community can enhance the WST's capabilities and effectiveness.

  7. STS payloads mission control study. Volume 2-A, Task 1: Joint products and functions for preflight planning of flight operations, training and simulations

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Specific products and functions, and associated facility availability, applicable to preflight planning of flight operations were studied. Training and simulation activities involving joint participation of STS and payload operations organizations, are defined. The prelaunch activities required to prepare for the payload flight operations are emphasized.

  8. Command and Control for Joint Air Operations

    DTIC Science & Technology

    2010-01-12

    systems, to include collaborative air planning tools such as the theater battle management core system ( TBMCS ). Operational level air planning occurs in...sight communications and data exchange equipment in order to respond to joint force requirements. For example, the TBMCS is often used. The use of ATO...generation and dissemination software portions of TBMCS has been standardized. This ATO feature allows the JAOC to be interoperable with other

  9. The Development of Action Planning in a Joint Action Context

    ERIC Educational Resources Information Center

    Paulus, Markus

    2016-01-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…

  10. Joint Command and Control of Cyber Operations: The Joint Force Cyber Component Command (JFCCC)

    DTIC Science & Technology

    2012-05-04

    relies so heavily on complex command and control systems and interconnectivity in general, cyber warfare has become a serious topic of interest at the...defensive cyber warfare into current and future operations and plans. In particular, Joint Task Force (JTF) Commanders must develop an optimum method to

  11. Strategy Planning Visualization Tool (SPVT) for the Air Operations Center (AOC). Volume 2: Information Operations (IO) Planning Enhancements

    DTIC Science & Technology

    2009-12-31

    Status and Assessment data interfaces leverage the TBONE Services and data model. The services and supporting Java 2 Platform Enterprise Edition (J2EE...existing Java ™ and .Net developed “Fat Clients.” The IOPC-X design includes an Open Services Gateway Initiative (OSGi) compliant plug-in...J2EE Java 2 Platform Enterprise Edition JAOP Joint Air Operations Plan JAST JAOP AOD Status Tool JFACC Joint Forces Air Component Commander Data

  12. Counterinsurgency and Operational Art: Is the Joint Campaign Planning Model Adequate?

    DTIC Science & Technology

    2003-01-01

    ART: IS THE JOINT CAMAPIGN PLANNING MODEL ADEQUATE? by MAJ Thomas Erik Miller, USA, 90 pages. The United States has conducted or supported more than a...increase. Some of the effects of the fall of the Soviet Union were a loosening of internal and external political and social controls in formerly Soviet...order” in the social , economic and political arena through rapid growth in population and urbanization in the underdeveloped world, globalization and

  13. Joint Newspaper Operating Agreements.

    ERIC Educational Resources Information Center

    Parsons, Marie

    The number of competing daily newspapers in American cities has dwindled until only about 50 cities boast two papers. Of the newspapers in those cities, 23 now maintain separate editorial operations but have joint printing, advertising, and circulation departments. The concept of joint operation is 50 years old, dating from the Depression years…

  14. ONR Tidal Flats DRI: Planning Joint Modeling and Field Exercises

    DTIC Science & Technology

    2007-01-01

    ONR Tidal Flats DRI: Planning Joint Modeling and Field Exercises Lyle Hibler Battelle/Marine Research Operations 1529 West Sequim Bay Road...West Sequim Bay Road Sequim , WA 98382 Phone: (360) 681-4591 Fax: (360) 681-4598 Email: adam.maxwell@pnl.gov Award Number: N000140710694...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Battelle/Marine Research Operations,1529 West Sequim Bay Road, Sequim ,WA,98382 8. PERFORMING ORGANIZATION

  15. Applying an AI Planner to Military Operations Planning

    DTIC Science & Technology

    1993-01-12

    This paper describes a prototype system for quickly developing joint military courses of action. The system, SOCAP (System for Operations Crisis...display and applies this technology to military operations planning. This paper describes the Socap problem domain, how SIPE-2 was used to address this problem, and the strengths and weaknesses of our approach.

  16. Application of finite element analysis in pre-operative planning for deformity correction of abnormal hip joints--a case series.

    PubMed

    Rhyu, K H; Kim, Y H; Park, W M; Kim, K; Cho, T-J; Choi, I H

    2011-09-01

    In experimental and clinical research, it is difficult to directly measure responses in the human body, such as contact pressure and stress in a joint, but finite element analysis (FEA) enables the examination of in vivo responses by contact analysis. Hence, FEA is useful for pre-operative planning prior to orthopaedic surgeries, in order to gain insight into which surgical options will result in the best outcome. The present study develops a numerical simulation technique based on FEA to predict the surgical outcomes of osteotomy methods for the treatment of slipped capital femoral epiphyses. The correlation of biomechanical parameters including contact pressure and stress, for moderate and severe cases, is investigated. For severe slips, a base-of-neck osteotomy is thought to be the most reliable and effective surgical treatment, while any osteotomy may produce dramatic improvement for moderate slips. This technology of pre-operative planning using FEA can provide information regarding biomechanical parameters that might facilitate the selection of optimal osteotomy methods and corresponding surgical options.

  17. Automated planning of MRI scans of knee joints

    NASA Astrophysics Data System (ADS)

    Bystrov, Daniel; Pekar, Vladimir; Young, Stewart; Dries, Sebastian P. M.; Heese, Harald S.; van Muiswinkel, Arianne M.

    2007-03-01

    A novel and robust method for automatic scan planning of MRI examinations of knee joints is presented. Clinical knee examinations require acquisition of a 'scout' image, in which the operator manually specifies the scan volume orientations (off-centres, angulations, field-of-view) for the subsequent diagnostic scans. This planning task is time-consuming and requires skilled operators. The proposed automated planning system determines orientations for the diagnostic scan by using a set of anatomical landmarks derived by adapting active shape models of the femur, patella and tibia to the acquired scout images. The expert knowledge required to position scan geometries is learned from previous manually planned scans, allowing individual preferences to be taken into account. The system is able to automatically discriminate between left and right knees. This allows to use and merge training data from both left and right knees, and to automatically transform all learned scan geometries to the side for which a plan is required, providing a convenient integration of the automated scan planning system in the clinical routine. Assessment of the method on the basis of 88 images from 31 different individuals, exhibiting strong anatomical and positional variability demonstrates success, robustness and efficiency of all parts of the proposed approach, which thus has the potential to significantly improve the clinical workflow.

  18. The Joint Master Operational Planner

    DTIC Science & Technology

    2016-04-04

    Daniel H. Hibner, United States Army Joint Forces Staff College Joint Advanced Warfighting School 7800 Hampton Blvd. Norfolk, VA 23511-1702 Approved...Operational Art. Unclass Unclass Unclass Unclassified Unlimited 66 757-443-6301 NATIONAL DEFENSE UNIVERSITY JOINT FORCES STAFF COLLEGE JOINT ADVANCED...of this paper reflect my own personal views and are not necessarily endorsed by the Joint Forces Staff College or the department of Defense. Thesis

  19. Mortuary Affairs in Joint Operations

    DTIC Science & Technology

    2006-06-05

    regulations, and doctrine. For the Chairman of the Joint Chiefs of Staff: WALTER L. SHARP Lieutenant General , USA Director, Joint Staff SUMMARY OF...Introduction ........................................................................................................... VII-1 • General Guidance...disposition of human remains ( PADD ); maintaining temporary interment sites including the recording of interment and disinterment actions; operation of the

  20. Planning and implementing forest operations to achieve sustainable forests: Proceedings of papers presented at the joint meeting of the Council on Forest Engineering and International Union of Forest Research Organizations.

    Treesearch

    Charles R. Blinn; Michael A. Thompson

    1996-01-01

    Contains a variety of papers presented at the joint meeting of the Council on Forest Engineering and International Union of Forest Research Organizations Subject Group S3.04 and that support the meeting theme "Planning and Implementing Forest Operations to Achieve Sustainable Forests."

  1. Joint Chiefs of Staff > Directorates > J5 | Strategic Plans and Policy

    Science.gov Websites

    Quadrilateral Logistics Forum J5 | Strategic Plans and Policy J6 | C4 & Cyber J7 | Joint Force Development J8 | Force Structure, Resources & Assessment Contact J5 Strategic Plans and Policy Home : Directorates : J5 | Strategic Plans and Policy Mission The Joint Staff J5 proposes strategies, plans, and

  2. Joint Chiefs of Staff > Directorates > J3 | Operations

    Science.gov Websites

    Joint Staff Structure Joint Staff Inspector General Origin of Joint Concepts U.S. Code | Joint Chiefs of J8 | Force Structure, Resources & Assessment Contact J3 Operations Home : Directorates : J3

  3. Development of the joint munitions planning system - a planning tool for the ammunition community.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hummel, J. R.; Winiecki, A. L.; Fowler, R. S.

    2004-10-01

    The United States Army Joint Munitions Command (JMC) is the executive agent for the Single Manager for Conventional Ammunition (SMCA). As such the JMC is responsible for the storage and transportation of all Service's SMCA as well as non-SMCA munitions. Part of the JMC mission requires that complex depot capacity studies, transportation capabilities analyses, peacetime re-allocations/ redistribution plans and time-phased deployment distribution plans be developed. Beginning in 1999 the Joint Munitions Planning System (JMPS) was developed to provide sourcing and movement solutions of ammunition for military planners.

  4. Deficiencies in Indian Joint Operations

    DTIC Science & Technology

    2016-05-26

    Pakistan Navy escorted its oil tankers along the Makran Coast to avoid a naval engagement. The key tasks for Operation Talwar included preventing... Informatics plays a major role in ensuring that intelligence is available in time and in the desired form. The US Principles of Joint Operations59 1

  5. Multi Sector Planning Tools for Trajectory-Based Operations

    NASA Technical Reports Server (NTRS)

    Prevot, Thomas; Mainini, Matthew; Brasil, Connie

    2010-01-01

    This paper discusses a suite of multi sector planning tools for trajectory-based operations that were developed and evaluated in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center. The toolset included tools for traffic load and complexity assessment as well as trajectory planning and coordination. The situation assessment tools included an integrated suite of interactive traffic displays, load tables, load graphs, and dynamic aircraft filters. The planning toolset allowed for single and multi aircraft trajectory planning and data communication-based coordination of trajectories between operators. Also newly introduced was a real-time computation of sector complexity into the toolset that operators could use in lieu of aircraft count to better estimate and manage sector workload, especially in situations with convective weather. The tools were used during a joint NASA/FAA multi sector planner simulation in the AOL in 2009 that had multiple objectives with the assessment of the effectiveness of the tools being one of them. Current air traffic control operators who were experienced as area supervisors and traffic management coordinators used the tools throughout the simulation and provided their usefulness and usability ratings in post simulation questionnaires. This paper presents these subjective assessments as well as the actual usage data that was collected during the simulation. The toolset was rated very useful and usable overall. Many elements received high scores by the operators and were used frequently and successfully. Other functions were not used at all, but various requests for new functions and capabilities were received that could be added to the toolset.

  6. Future Operating Concept - Joint Computer Network Operations

    DTIC Science & Technology

    2010-02-17

    into the system‖ at a later date by circumventing the need for access privileges 3. Cyberwarfare Tools 67 • Social Engineering • Hacking ...Forces Command, Joint Operating Environment 2008, November 2008https://us.jfcom.mil/sites/ J5 /j59/default.aspx VIII Appendix V

  7. The Joint Staff Strategic Information Technology Plan

    DTIC Science & Technology

    1995-09-01

    analyses or assessments. Gaming Division ( SAGD ) is responsible for: This element also addresses the modification of existing applications necessary to...Joint Military Net Assessment, and the Joint Strategic Planning System. SAGD Gaming Suite: SAGD’s mission has • undergone revision and expansion, As...situations using both gaming and analytical assessments. approaches. Table 3 gives characteristics of some of the types of applications that SAGD has • * 4

  8. Race-Neutral Campuses in Urban Areas: A Follow-Up Report on Merger and Joint Planning.

    ERIC Educational Resources Information Center

    Godard, James M.

    Developments during the 1980-81 academic year concerning mergers/joint planning projects designed to eliminate unnecessary duplication of programs between historically black and white colleges in Nashville, Tennessee; Savannah, Georgia; and Norfolk, Virginia are examined. Site visits were made during the second year of operation of the programs at…

  9. Revitalizing Nuclear Operations in the Joint Environment

    DTIC Science & Technology

    2014-02-01

    height of the Cold War, US schol - ars and joint operational planners were working simultaneously on weapons development and operational art to employ...leadership’s large-target- category withholds thought necessary to maintain stability in a strategic crisis. The inclusion of nuclear effects and...escalation. The inclusion of these points in tomorrow’s doctrine as well as an intellec- tual discussion on the topic will inform Joint Staff planners

  10. JOMAR: Joint Operations with Mobile Autonomous Robots

    DTIC Science & Technology

    2015-12-21

    AFRL-AFOSR-JP-TR-2015-0009 JOMAR: Joint Operations with Mobile Autonomous Robots Edwin Olson UNIVERSITY OF MICHIGAN Final Report 12/21/2015...SUBTITLE JOMAR: Joint Operations with Mobile Autonomous Robots 5a. CONTRACT NUMBER FA23861114024 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6...14. ABSTRACT Under this grant, we formulated and implemented a variety of novel algorithms that address core problems in multi- robot systems. These

  11. Joint Venture Health Plans May Give ACOs a Run for Their Money.

    PubMed

    Reinke, Thomas

    2016-12-01

    Joint venture plans are starting to demonstrate their ability to implement clinical management and financial management reforms. A JV health plan replaces the offloading of financial risk by health plans to ill-equipped providers with an executive-level cost management committee stated jointly by the hospital and payer.

  12. Joint Planning Of Energy Storage and Transmission Considering Wind-Storage Combined System and Demand Side Response

    NASA Astrophysics Data System (ADS)

    Huang, Y.; Liu, B. Z.; Wang, K. Y.; Ai, X.

    2017-12-01

    In response to the new requirements of the operation mode of wind-storage combined system and demand side response for transmission network planning, this paper presents a joint planning of energy storage and transmission considering wind-storage combined system and demand side response. Firstly, the charge-discharge strategy of energy storage system equipped at the outlet of wind farm and demand side response strategy are analysed to achieve the best comprehensive benefits through the coordination of the two. Secondly, in the general transmission network planning model with wind power, both energy storage cost and demand side response cost are added to the objective function. Not only energy storage operation constraints and but also demand side response constraints are introduced into the constraint condition. Based on the classical formulation of TEP, a new formulation is developed considering the simultaneous addition of the charge-discharge strategy of energy storage system equipped at the outlet of the wind farm and demand side response strategy, which belongs to a typical mixed integer linear programming model that can be solved by mature optimization software. The case study based on the Garver-6 bus system shows that the validity of the proposed model is verified by comparison with general transmission network planning model. Furthermore, the results demonstrate that the joint planning model can gain more economic benefits through setting up different cases.

  13. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    NASA Astrophysics Data System (ADS)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of

  14. STS payloads mission control study continuation phase A-1. Volume 2-C, task 3: Identification of joint activities and estimation of resources in preparation for joint flight operations

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Payload mission control concepts are developed for real time flight operations of STS. Flight planning, training, simulations, and other flight preparations are included. Payload activities for the preflight phase, activity sequences and organizational allocations, and traffic and experience factors to establish composite man-loading for joint STS payload activities are identified for flight operations from 1980 to 1985.

  15. Joint Forward Operating Base Elements of Command and Control

    NASA Astrophysics Data System (ADS)

    Summers, William C.

    2002-01-01

    Since the 1986 Goldwater-Nichols Act directed the Chairman of the Joint Chiefs of Staff to develop doctrine for the joint employment of the armed forces, tactics, techniques, and procedures have evolved at different rates depending on the competency. Whereas the command of joint air forces is well prescribed within the structure of the air operations center and its associated leadership, command of air assets at a joint forward operating base lacks guidance. Today, the United States prosecutes an air war over Afghanistan from bases in Uzbekistan, Pakistan, and Afghanistan. Elements of the United States Army, Air Force, and Marines combine at these geographically minute locations, each bringing a certain complement of support and command and control. Evidence from operations during the 1999 air war for Kosovo at Tirana Rinas Airport in Albania suggests that when these service elements meet at the airfield for the first time, there are problems associated with local procedure. At best, time is wasted creating local joint systems to overcome the difficulties. At worst, safety and mission accomplishment are jeopardized. This thesis will address the need to develop doctrine and a jointly integrated organization to support the command and control function at a forward operating base.

  16. Discussion on joint operation of wind farm and pumped-storage hydroplant

    NASA Astrophysics Data System (ADS)

    Li, Caifang; Wu, Yichun; Liang, Hao; Li, Miao

    2017-12-01

    Due to the random fluctuations in wind power, large amounts of grid integration will have a negative impact on grid operation and the consumers. The joint operation with pumped-storage hydroplant with good peak shaving performance can effectively reduce the negative impact on the safety and economic operation of power grid, and improve the utilization of wind power. In addition, joint operation can achieve the optimization of green power and improve the comprehensive economic benefits. Actually, the rational profit distribution of joint operation is the premise of sustainable and stable cooperation. This paper focuses on the profit distribution of joint operation, and applies improved shapely value method, which taking the investments and the contributions of each participant in the cooperation into account, to determine the profit distribution. Moreover, the distribution scheme can provide an effective reference for the actual joint operation of wind farm and pumped-storage hydroplant.

  17. Hinode/EIS science planning and operations tools

    NASA Astrophysics Data System (ADS)

    Rainnie, Jonn A.

    2016-07-01

    We present the design, implementation and maintenance of the suite of software enabling scientists to design and schedule Hinode/EIS1 operations. The total of this software is the EIS Science Planning Tools (EISPT), and is predominately written in IDL (Interactive Data Language), coupled with SolarSoft (SSW), an IDL library developed for solar missions. Hinode is a multi-instrument and wavelength mission designed to observe the Sun. It is a joint Japan/UK/US consortium (with ESA and Norwegian involvement). Launched in September 2006, its principal scientific goals are to study the Sun's variability and the causes of solar activity. Hinode operations are coordinated at ISAS (Tokyo, Japan). A daily Science Operations meeting is attended by the instrument teams and the spacecraft team. Nominally, science plan uploads cover periods of two or three days. When the forthcoming operations have been agreed, the necessary spacecraft operations parameters are created. These include scheduling for spacecraft pointing and ground stations. The Extreme UV Imaging Spectrometer (EIS) instrument, led by the UK (the PI institute is MSSL), is designed to observe the emission spectral lines of the solar atmosphere. Observations are composed of reusable, hierarchical components, including lines lists (wavelengths of spectral lines), rasters (exposure times, line list, etc.) and studies (defines one or more rasters). Studies are the basic unit of "timeline" scheduling. They are a useful construct for generating more complex sequences of observations, reducing the planning burden. Instrument observations must first be validated. An initial requirement was that operations be shared equally by the 3 main EIS teams (Japan, UK and US). Hence, a major design focus of the software was "Remote Operations", whereby any scientist in any location can run the software, schedule a science plan and send it to the spacecraft commanding team. It would then be validated and combined with the science

  18. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    NASA Astrophysics Data System (ADS)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  19. Capital planning for operating theatres based on projecting future theatre requirements.

    PubMed

    Sheehan, Jennifer A; Tyler, Peter; Jayasinha, Hirani; Meleady, Kathleen T; Jones, Neill

    2011-05-01

    During 2006, NSW and ACT Health Departments jointly engaged KPMG to develop an Operating Theatre Requirements' Projection Model and an accompanying planning guideline. A research scan was carried out to identify drivers of surgical demand, theatre capacity and theatre performance, as well as locating existing approaches to modelling operating theatre requirements for planning purposes. The project delivered a Microsoft Excel-based model for projecting future operating theatre requirements, together with an accompanying guideline for use of the model and interpretation of its outputs. It provides a valuable addition to the suite of tools available to Health staff for service and capital planning. The model operates with several limitations, largely due to being data dependent, and the state and completeness of available theatre activity data. However, the operational flexibility built into the model allows users to compensate for these limitations, on a case by case basis, when the user has access to suitable, local data. The design flexibility of the model means that updating the model as improved data become available is not difficult; resulting in revisions being able to be made quickly, and disseminated to users rapidly.

  20. Joint crisis plans and psychiatric advance directives in German psychiatric practice.

    PubMed

    Radenbach, Katrin; Falkai, Peter; Weber-Reich, Traudel; Simon, Alfred

    2014-05-01

    This study explores the attitude of German psychiatrists in leading positions towards joint crisis plans and psychiatric advance directives. This topic was examined by contacting 473 medical directors of German psychiatric hospitals and departments. They were asked to complete a questionnaire developed by us. That form contained questions about the incidence and acceptance of joint crisis plans and psychiatric advance directives and previous experiences with them. 108 medical directors of psychiatric hospitals and departments responded (response rate: 22.8%). Their answers demonstrate that in their hospitals these documents are rarely used. Among the respondents, joint crisis plans are more accepted than psychiatric advance directives. There is a certain uncertainty when dealing with these instruments. Our main conclusion is that German psychiatry needs an intensified discussion on the use of instruments for patients to constitute procedures for future critical psychiatric events. For this purpose it will be helpful to collect more empirical data. Furthermore, the proposal of joint crisis plans in psychiatric hospitals and departments should be discussed as well as the possibility of consulting an expert during the preparation of a psychiatric advance directive.

  1. Space Situational Awareness in the Joint Space Operations Center

    NASA Astrophysics Data System (ADS)

    Wasson, M.

    2011-09-01

    Flight safety of orbiting resident space objects is critical to our national interest and defense. United States Strategic Command has assigned the responsibility for Space Situational Awareness (SSA) to its Joint Functional Component Command - Space (JFCC SPACE) at Vandenberg Air Force Base. This paper will describe current SSA imperatives, new developments in SSA tools and developments in Defensive Operations. Current SSA processes are being examined to capture, and possibly improve, tasking of SSN sensors and "new" space-based sensors, "common" conjunction assessment methodology, and SSA sharing due to the growth seen over the last two years. The stand-up of a Defensive Ops Branch will highlight the need for advanced analysis and collaboration across space, weather, intelligence, and cyber specialties. New developments in SSA tools will be a description of computing hardware/software upgrades planned as well as the use of User-Defined Operating Pictures and visualization applications.

  2. 7 CFR 1400.203 - Joint operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF AGRICULTURE GENERAL REGULATIONS AND POLICIES PAYMENT LIMITATION AND PAYMENT ELIGIBILITY FOR 2009 AND SUBSEQUENT CROP, PROGRAM, OR FISCAL YEARS Payment Eligibility § 1400.203 Joint operations. (a) A...

  3. 30 CFR 780.14 - Operation plan: Maps and plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...

  4. 30 CFR 784.23 - Operation plan: Maps and plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 784.23 Section... PLAN § 784.23 Operation plan: Maps and plans. Each application shall contain maps and plans as follows... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  5. Operation Joint Guard (SFOR) Bosnia. Assessment of Operational Stress and Adaptive Coping Mechanisms of Soldiers

    DTIC Science & Technology

    1998-03-01

    married, 3 children, \\ more than two years w/company J V ^ I am constantly placed in an ethical dilemmas daily in front of my soldiers. I do...and lessons learned are presented . 14. SUBJECT TERMS Bosnia, Operation Joint Guard, Operation Joint Endeavor, Peacekeeping, Stress, Psychological...keeping operations present challenging environments to any military organization and its soldiers. Soldiers will often be required to perform their

  6. 76 FR 3157 - Joint Operations Center Relocation Project, Sacramento County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... Water Resources (DWR), the lead State agency, will prepare a joint EIS/EIR for the proposed Joint... following departments: DWR's Division of Operations and Maintenance, Operations Control Office, State Water...

  7. Improving Therapeutic Relationships: Joint Crisis Planning for Individuals With Psychotic Disorders.

    PubMed

    Farrelly, Simone; Lester, Helen; Rose, Diana; Birchwood, Max; Marshall, Max; Waheed, Waquas; Henderson, R Claire; Szmukler, George; Thornicroft, Graham

    2015-12-01

    Outcomes for individuals with psychosis remain far from acceptable. Recently, prominent psychiatrists have called for an improved understanding of the impact of social contexts, and how social contexts might influence the development and maintenance of mental health problems. A key social context for individuals with psychosis is the therapeutic relationship. As part of a trial of joint crisis planning in England, this qualitative study aimed to determine the mechanism through which joint crisis planning might affect the therapeutic relationship. Results suggest that routine processes in mental health care are affected by policy and organizational requirements for risk mitigation-aspects that undermine person-centered approaches. In contrast, strong therapeutic relationships are characterized by individualized care and reliable and respectful treatment. The Joint Crisis Plan intervention partially succeeded in reducing contextual influences on routine role enactments, facilitating the demonstration of respect and improving the therapeutic relationship. © The Author(s) 2015.

  8. What It Takes. Air Force Command of Joint Operations

    DTIC Science & Technology

    2009-01-01

    Iraq Assistance Group IDE intermediate developmental education IO international organization ISAF International Security and Assistance Force ISR...Operations Table A.1—Continued Joint Task Force Mission/Operation Start End Service Command Rank JTF–Joint Area Support Group (JASG) Iraqi Freedom...be of interest to a wide group of Air Force personnel involved in the development and func- tion of the service’s command organizations, including

  9. Command and Control for Joint Air Operations.

    DTIC Science & Technology

    1994-11-14

    publication apply to the throughout the range of military commanders of combatant commands, operations. subunified commands, joint task forces, and...this doctrine (or operations as well as the doctrinal basis JTTP) will be followed except when, in for US military involvement in the judgment of the...commander, multinational and interagency operations. exceptional circumstances dictate It provides military guidance for the otherwise. If conflicts

  10. [Arthroscopic therapy of ankle joint impingement syndrome after operation of ankle joint fracture dislocation].

    PubMed

    Feng, Zhibin; Mi, Kun; Wei, Renzhi; Liu, Wu; Wang, Bin

    2011-07-01

    To study the operative procedure and the effectiveness of arthroscopic therapy for ankle joint impingement syndrome after operation of ankle joint fracture dislocation. Between March 2008 and April 2010, 38 patients with ankle joint impingement syndrome after operation of ankle joint fracture dislocation were treated. Among them, there were 28 males and 10 females with an average age of 28 years (range, 18 to 42 years). The time from internal fixation to admission was 12-16 months (mean, 13.8 months). There were pressing pain in anterolateral and anterior ankle. The dorsal extension ranged from -20 to -5 degrees (mean, -10.6 degrees), and the palmar flexion was 30-40 degrees (mean, 35.5 degrees). The total score was 48.32 +/- 9.24 and the pain score was 7.26 +/- 1.22 before operation according to American Orthopaedic Foot and Ankle Society (AOFAS) ankle and hindfoot score system. The X-ray films showed osteophyte formation in anterior tibia and talus; MRI showed cartilage injury in 22 cases. Arthroscopic intervention included removing osteophytes, debriding fabric scars and synovial membrane tissues, and removing osteochondral fragments. Arthroscopic microfracture technique was used in 22 patients with cartilage injury. All incisions healed primarily. Thirty-eight cases were followed up 10-26 months (mean, 16 months). At last follow-up, 26 patients had normal range of motion (ROM); the dorsal extension was 15-25 degrees (mean, 19.6 degrees) and the palmar flexion was 35-45 degrees (mean, 40.7 degrees). Eight patients had mild limited ROM; the dorsal extension was 5-15 degrees (mean, 7.2 degrees) and the palmar flexion was 35-45 degrees (mean, 39.5 degrees). Four patients had mild limited ROM and pain in posterior portion of the ankle after a long walking (3-4 hours); the dorsal extension was 0-5 degrees (mean, 2.6 degrees) and the palmar flexion was 35-40 degrees (mean, 37.5 degrees). The total score was 89.45 +/- 9.55 and the pain score was 1.42 +/- 1.26 after

  11. Bugs, Gas, and Joint Maritime Operations--Are we Immune?

    DTIC Science & Technology

    1992-06-19

    asPira::on - and an opp rtunity. ŗ Even with the collapse of Soviet communism , there are powers who would challenge our aspirations: a technological ... technological data are used to analyze the effects of chemica’l warfare on joint naval operations throughout the continuum of peace, conflict and war. A judgement...IM1MUNE? Historical and technological data are used to analyze the effects of chemical warfare on joint naval operations throughout the continuum of

  12. Final Environmental Assessment: For Joint Base Anacostia-Bolling Master Plan District of Columbia

    DTIC Science & Technology

    2010-09-30

    the impacts of vehicle travel and facilitate alternative modes of transportation that would reduce air pollutants . Noise: There would be...ltlb•nKM nr~t~~G.,~ StEiiubetlls Fort McNair East Potomac Pari < Poplar Point "" Joint Base Anacostia-Bolling Master Plan Environmental...Industrial $uppon Eost Potomac Pari < Poplar Point Joint Base Anacostia-Bolling Master Plan Environmental Assessment pg. 16 Several general

  13. Joint ETV/NOWATECH test plan for the Sorbisense GSW40 passive sampler

    EPA Science Inventory

    The joint test plan is the implementation of a test design developed for verification of the performance of an environmental technology following the NOWATECH ETV method. The verification is a joint verification with the US EPA ETV scheme and the Advanced Monitoring Systems Cent...

  14. Major Joint/Combined Operations

    DTIC Science & Technology

    2008-01-01

    Quarterly 3 (Winter 1993–1994), 74. 20 Andrew G. B. Vallance , The Air Weapon: Doctrines of Air Power Strategy and Operational Art (New York: St... Vallance , 94; and Donald L. McSwain, Air Campaign Planning for Contingency Operations (Maxwell Air Force Base, AL: Air War College, May 1989), 37. 23...require positive identification of friendly forces and positive control of aircraft. 36 Richard R. Muller, “Close Air Support: The German, British

  15. Systemic Operational Design: Enhancing the Joint Operation Planning Process

    DTIC Science & Technology

    2007-05-20

    Epistemological Bumpf of the Way Ahead for Operational Design? p. 42. 79 Stephen R. Covey, The 7 Habits of Highly Effective People . (New York: Fireside...John Wiley and Sons, Ltd. Covey, Stephen R. 1989. The 7 Habits of Highly Effective People . New York: Fireside Publishing. Creveld, Martin Van

  16. Space shuttle operations integration plan

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The Operations Integration Plan is presented, which is to provide functional definition of the activities necessary to develop and integrate shuttle operating plans and facilities to support flight, flight control, and operations. It identifies the major tasks, the organizations responsible, their interrelationships, the sequence of activities and interfaces, and the resultant products related to operations integration.

  17. 78 FR 65739 - Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment to the Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70765; File No. 4-443] Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment to the Plan for the Purpose of Developing and Implementing Procedures Designed To Facilitate the Listing and Trading of Standardized Options To Add Topaz Exchange, LLC as a Plan Sponsor October...

  18. National volcanic ash operations plan for aviation

    USGS Publications Warehouse

    ,; ,

    2007-01-01

    International Civil Aviation Organization’s (ICAO) International Airways Volcano Watch. This plan defines agency responsibilities, provides a comprehensive description of an interagency standard for volcanic ash products and their formats, describes the agency backup procedures for operational products, and outlines the actions to be taken by each agency following an occurrence of a volcanic eruption that subsequently affects and impacts aviation services. Since our most recent International Conference on Volcanic Ash and Aviation Safety, volcanic ash-related product and service activities have grown considerably along with partnerships and alliances throughout the aviation community. In January 2005, the National Oceanic and Atmospheric Administration’s National Centers for Environment Prediction began running the Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model in place of the Volcanic Ash Forecast Transport and Dispersion (VAFTAD) model, upgrading support to the volcanic ash advisory community. Today, improvements to the HYSPLIT model are ongoing based on recommendations by the OFCM-sponsored Joint Action Group for the Selection and Evaluation of Atmospheric Transport and Diffusion Models and the Joint Action Group for Atmospheric Transport and Diffusion Modeling (Research and Development Plan). Two international workshops on volcanic ash have already taken place, noticeable improvements and innovations in education, training, and outreach have been made, and federal and public education and training programs on volcanic ash-related products, services, and procedures iv continue to evolve. For example, in partnership with Embry-Riddle Aeronautical University and other academic institutions, volcanic ash hazard and mitigation training has been incorporated into aviation meteorology courses. As an essential next step, our volcanic ash-related efforts in the near term will be centered on the development of an interagency implementation plan to

  19. Operation Stabilise: U.S. Joint Force Operations in East Timor

    DTIC Science & Technology

    2001-04-01

    September 1999, while deliberating the issue, Adm Blair designated the USS Mobile Bay (CG 53) and the USNS Kilauea (T-AE 26) as Joint Task Force-Timor Sea...Timor Sea Operations, 7th Fleet, Pacific Fleet § USS MOBILE BAY (CG 53), CJTF TSO (CAPT Edward Rogers, USN) § USNS KILAUEA (T-AE 26) § USNS SAN JOSE (T

  20. 14 CFR 121.533 - Responsibility for operational control: Domestic operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations... aircraft dispatcher are jointly responsible for the preflight planning, delay, and dispatch release of a flight in compliance with this chapter and operations specifications. (c) The aircraft dispatcher is...

  1. 14 CFR 121.533 - Responsibility for operational control: Domestic operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations... aircraft dispatcher are jointly responsible for the preflight planning, delay, and dispatch release of a flight in compliance with this chapter and operations specifications. (c) The aircraft dispatcher is...

  2. 14 CFR 121.533 - Responsibility for operational control: Domestic operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations... aircraft dispatcher are jointly responsible for the preflight planning, delay, and dispatch release of a flight in compliance with this chapter and operations specifications. (c) The aircraft dispatcher is...

  3. 14 CFR 121.533 - Responsibility for operational control: Domestic operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations... aircraft dispatcher are jointly responsible for the preflight planning, delay, and dispatch release of a flight in compliance with this chapter and operations specifications. (c) The aircraft dispatcher is...

  4. 14 CFR 121.533 - Responsibility for operational control: Domestic operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations... aircraft dispatcher are jointly responsible for the preflight planning, delay, and dispatch release of a flight in compliance with this chapter and operations specifications. (c) The aircraft dispatcher is...

  5. Operative Versus Non-operative Treatment of Grade III Acromioclavicular Joint Dislocations and the Use of SurgiLig: a Retrospective Review.

    PubMed

    Younis, Fizan; Ajwani, Sanil; Bibi, Asia; Riley, Eleanor; Hughes, Peter J

    2017-12-30

    Acromioclavicular joint dislocations are common shoulder girdle injuries. The treatment of grade III acromioclavicular joint dislocations is controversial. Furthermore, the literature on the use of the Sur-giligTM synthetic ligament for reconstruction of dislocations is sparse. This retrospective review aimed to establish whether operative treatment was superior to non-operative treatment in grade III acromioclavicular joint dislocations treated at our institute over a 5-year period. We also reviewed the effectiveness of reconstruction with SurgiligTM after acute and chronic dislocations across all grades of acromioclavicular joint dislocations. Twenty-five patients completed full follow-up with grade III dislocations. The mean follow-up in the operated group was 3.56 years and in the non-operated group this was 3.29 years. The mean Oxford Shoul-der Score (OSS) in the operated group was 39.8, whereas the mean OSS in the non-operated group was 45.9 (p=0.01). The mean pain score in the operated group was 2.2, and in the non-operated group this was 1.6. The mean satisfaction score in the operated group was 8.2 and that in the non-operated group was 7.8. There was no statistically significant difference in pain or satisfaction scores. In respect to the cohort treated with Surg-iligTM synthetic ligament, 22 patients across all grades of dislocations had this procedure performed. The mean post-operative Oxford Shoulder Score (OSS) was 40. 1. Non-operative treatment is not inferior to operative treatment for grade III acromioclavicular joint dislocations. The data from this study demonstrat-ed that the non-operated group had superior Ox-ford Shoul-der Scores that were statistically significant. 2. Additionally, the use of the SurgiligTM ligament appears to be effective in treating both chronic and acute acromioclavicular joint dislocations.

  6. 30 CFR 780.13 - Operation plan: Blasting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.13 Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed...

  7. Biomedical programs operations plans

    NASA Technical Reports Server (NTRS)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  8. The Mission Operations Planning Assistant

    NASA Technical Reports Server (NTRS)

    Schuetzle, James G.

    1987-01-01

    The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

  9. The mission operations planning assistant

    NASA Technical Reports Server (NTRS)

    Schuetzle, James G.

    1987-01-01

    The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Prinicpal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZETALISP and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

  10. Architecture for spacecraft operations planning

    NASA Technical Reports Server (NTRS)

    Davis, William S.

    1991-01-01

    A system which generates plans for the dynamic environment of space operations is discussed. This system synthesizes plans by combining known operations under a set of physical, functional, and temperal constraints from various plan entities, which are modeled independently but combine in a flexible manner to suit dynamic planning needs. This independence allows the generation of a single plan source which can be compiled and applied to a variety of agents. The architecture blends elements of temperal logic, nonlinear planning, and object oriented constraint modeling to achieve its flexibility. This system was applied to the domain of the Intravehicular Activity (IVA) maintenance and repair aboard Space Station Freedom testbed.

  11. Operator-assisted planning and execution of proximity operations subject to operational constraints

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1991-01-01

    Future multi-vehicle operations will involve multiple scenarios that will require a planning tool for the rapid, interactive creation of fuel-efficient trajectories. The planning process must deal with higher-order, non-linear processes involving dynamics that are often counter-intuitive. The optimization of resulting trajectories can be difficult to envision. An interaction proximity operations planning system is being developed to provide the operator with easily interpreted visual feedback of trajectories and constraints. This system is hosted on an IRIS 4D graphics platform and utilizes the Clohessy-Wiltshire equations. An inverse dynamics algorithm is used to remove non-linearities while the trajectory maneuvers are decoupled and separated in a geometric spreadsheet. The operator has direct control of the position and time of trajectory waypoints to achieve the desired end conditions. Graphics provide the operator with visualization of satisfying operational constraints such as structural clearance, plume impingement, approach velocity limits, and arrival or departure corridors. Primer vector theory is combined with graphical presentation to improve operator understanding of suggested automated system solutions and to allow the operator to review, edit, or provide corrective action to the trajectory plan.

  12. Space Station Freedom operations planning

    NASA Technical Reports Server (NTRS)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  13. Joint Training In Combined Entry Operations

    DTIC Science & Technology

    2014-02-13

    AIR WAR COLLEGE AIR UNIVERSITY JOINT TRAINING IN COMBINED ENTRY OPERATIONS by Ethan Mitchell, CDR, USN A Research Report Submitted...government. DISTRIBUTION A . Approved for public release: distribution unlimited. 2 Biography CDR Ethan Mitchell is assigned to the Air War College...Areas of Responsibility. Ashore, her served in the requirements directorate on the Commander, Second Fleet staff and earned a Master’s of Science

  14. Automating Space Station operations planning

    NASA Technical Reports Server (NTRS)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  15. Joint Space Operations Center (JSpOC) Mission System Increment 3 (JMS Inc 3)

    DTIC Science & Technology

    2016-03-01

    2016 Major Automated Information System Annual Report Joint Space Operations Center (JSpOC) Mission System Increment 3 (JMS Inc 3) Defense...1725 DSN Phone: DSN Fax: Date Assigned: May 16, 2014 Program Information Program Name Joint Space Operations Center (JSpOC) Mission System...approved program baseline; therefore, no Original Estimate has been established. JMS Inc 3 2016 MAR UNCLASSIFIED 4 Program Description The Joint Space

  16. 14 CFR 121.535 - Responsibility for operational control: Flag operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... dispatcher are jointly responsible for the preflight planning, delay, and dispatch release of a flight in... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations...— (1) Monitoring the progress of each flight; (2) Issuing necessary instructions and information for...

  17. 14 CFR 121.535 - Responsibility for operational control: Flag operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... dispatcher are jointly responsible for the preflight planning, delay, and dispatch release of a flight in... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations...— (1) Monitoring the progress of each flight; (2) Issuing necessary instructions and information for...

  18. 14 CFR 121.535 - Responsibility for operational control: Flag operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... dispatcher are jointly responsible for the preflight planning, delay, and dispatch release of a flight in... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations...— (1) Monitoring the progress of each flight; (2) Issuing necessary instructions and information for...

  19. 14 CFR 121.535 - Responsibility for operational control: Flag operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... dispatcher are jointly responsible for the preflight planning, delay, and dispatch release of a flight in... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations...— (1) Monitoring the progress of each flight; (2) Issuing necessary instructions and information for...

  20. 14 CFR 121.535 - Responsibility for operational control: Flag operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... dispatcher are jointly responsible for the preflight planning, delay, and dispatch release of a flight in... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations...— (1) Monitoring the progress of each flight; (2) Issuing necessary instructions and information for...

  1. 13. Operational planning for a specific intervention.

    PubMed

    2014-05-01

    Every intervention must follow an operational plan. Operational plans delineate actions required to meet an objective that is part of the strategic plan (overarching goal). Operational plans dictate the critical pathways for the interventions that will be followed during and following the implementation of the intervention. Operational plans include: (1) an introduction and brief situation report; (2) an overview of the task(s), objectives, and the overarching goal to be addressed; (3) the methods that will be employed; (4) planning factors; (5) the resources that will be required including personnel, equipment, and supplies; (6) timelines, benchmarks, and milestones including their respective indicators, startup time, end point, and estimates of the time required for completion; (7) the administrative structure to be employed; (8) an operating budget; (9) the strategy for acquiring the funding required; (10) roles and responsibilities of the personnel including position descriptions and the competencies required of the personnel (skill sets); (11) mechanisms for monitoring the progress including the indicators that will be employed, (12) safety, including health of the personnel, required immunisations, accommodations, and reporting structure; (13) self-sufficiency; and (14) reporting and accounting. There are many generic items in an operational plan that can be used in successive plans. Without a detailed operational plan, interventions are doomed to probable failure and can profoundly negatively impact other projects operational in the area.

  2. [Fractures of the proximal interphalangeal joint: Diagnostic and operative therapy options].

    PubMed

    Unglaub, F; Langer, M F; Hahn, P; Müller, L P; Ahrens, C; Spies, C K

    2016-02-01

    Joint fractures of the fingers often entail operative interventions in contrast to extra-articular fractures. These types of fracture are inclined to dislocate in addition to the actual fracture. The proximal interphalangeal (PIP) joint in particular often shows comminuted fractures due to the long leverage of the finger and a relatively small diameter of the joint. The clinical examination, X-ray diagnostics and if necessary computed tomography allow the classification into stable and unstable fractures. Unstable fractures must be treated by surgical reduction and fixation. A multitude of operative techniques are available for these mostly complicated fractures. The foremost goal is a stable osteosynthesis of the fracture with repositioning of the dislocation, which enables early physiotherapy in order to prevent tendon adhesion and contracture. This article presents the different types of PIP joint fractures, their specific surgical treatment and postoperative treatment regimens.

  3. 78 FR 65733 - Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment to the Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70764; File No. 4-443] Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment to the Plan for the Purpose of Developing and Implementing Procedures Designed To Facilitate the Listing and Trading of Standardized Options To Add Miami International Securities Exchange, LLC (...

  4. Joint Publication 3-31. Command and Control for Joint Land Operations

    DTIC Science & Technology

    2010-06-29

    task force] FALCON .” Admiral James Ellis, Commander, Joint Task Force NOBLE ANVIL during Operation ALLIED FORCE in letter correspondence to RAND...beneficial effect on the gr ound cam paign.” D uring t he ca mpaign, “ Army and M arine artillery were used interchangeably.” SOURCE: Lieutenant...consolidates, prioritizes, and forwards ultra -high frequency tactical satellite requirements to the JFC for channel allocation. k. Establishes, supervises

  5. Parkland College 2001-2003 Operational Plan.

    ERIC Educational Resources Information Center

    Parkland Coll., Champaign, IL.

    This Parkland College (Illinois) Operational Plan supports the document titled Parkland College 1999-2004: A Strategic Plan for Excellence. Strategic goals and strategies are followed by specific operational action plans that support the completion of the given corresponding strategy. The four goals include: (1) to develop the highest educational…

  6. 78 FR 21245 - Continuity of Operations Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  7. Patient-specific instrumentation for total knee arthroplasty does not match the pre-operative plan as assessed by intra-operative computer-assisted navigation.

    PubMed

    Scholes, Corey; Sahni, Varun; Lustig, Sebastien; Parker, David A; Coolican, Myles R J

    2014-03-01

    The introduction of patient-specific instruments (PSI) for guiding bone cuts could increase the incidence of malalignment in primary total knee arthroplasty. The purpose of this study was to assess the agreement between one type of patient-specific instrumentation (Zimmer PSI) and the pre-operative plan with respect to bone cuts and component alignment during TKR using imageless computer navigation. A consecutive series of 30 femoral and tibial guides were assessed in-theatre by the same surgeon using computer navigation. Following surgical exposure, the PSI cutting guides were placed on the joint surface and alignment assessed using the navigation tracker. The difference between in-theatre data and the pre-operative plan was recorded and analysed. The error between in-theatre measurements and pre-operative plan for the femoral and tibial components exceeded 3° for 3 and 17% of the sample, respectively, while the error for total coronal alignment exceeded 3° for 27% of the sample. The present results indicate that alignment with Zimmer PSI cutting blocks, assessed by imageless navigation, does not match the pre-operative plan in a proportion of cases. To prevent unnecessary increases in the incidence of malalignment in primary TKR, it is recommended that these devices should not be used without objective verification of alignment, either in real-time or with post-operative imaging. Further work is required to identify the source of discrepancies and validate these devices prior to routine use. II.

  8. 76 FR 5224 - Joint Industry Plan; Notice of Filing of Amendment No. 25 to the Joint Self-Regulatory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Collection, Consolidation and Dissemination of Quotation and Transaction Information for Nasdaq-Listed... Exchange, Inc., EDGX Exchange, Inc., Financial Industry Regulatory Authority, Inc., International... Joint Self-Regulatory Organization Plan Governing the Collection, Consolidation, and Dissemination of...

  9. 78 FR 66788 - Joint Industry Plan; Order Approving Amendment No. 30 to the Joint Self-Regulatory Organization...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-06

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70793; File No. S7-24-89] Joint Industry Plan..., Consolidation and Dissemination of Quotation and Transaction Information for Nasdaq-Listed Securities Traded on... Exchange, Inc., Financial Industry Regulatory Authority, Inc., International Securities Exchange LLC...

  10. Planning Systems for Distributed Operations

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  11. Operation Plan 14-44 ICEBERG

    DTIC Science & Technology

    1944-12-31

    report of de struction is required. C. H. McMOHKCS Chief of Staff 258 DISTRIBUTION : Same as Op- Plan 14-44 1. E. KEETOW Asst. Flag Secretary...w by author*/ oficLIss OPERATION PLAN 14—44 ICEBERG \\. CiNcPOA BRIG GEN W.A.DUMAS FORC6S UNCLAES1FO Report Documentation Page Form ApprovedOMB No...4. TITLE AND SUBTITLE Operation Plan 14-44 Iceberg 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT

  12. 43 CFR 3592.1 - Operating plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... OPERATIONS Plans and Maps § 3592.1 Operating plans. (a) Before conducting any operations under any lease(s... description of geologic conditions and mineral resources, with appropriate maps, within the area where mining is to be conducted; (3) A copy of a suitable map or aerial photograph showing the topography, the...

  13. 43 CFR 3592.1 - Operating plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OPERATIONS Plans and Maps § 3592.1 Operating plans. (a) Before conducting any operations under any lease(s... description of geologic conditions and mineral resources, with appropriate maps, within the area where mining is to be conducted; (3) A copy of a suitable map or aerial photograph showing the topography, the...

  14. 43 CFR 3592.1 - Operating plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OPERATIONS Plans and Maps § 3592.1 Operating plans. (a) Before conducting any operations under any lease(s... description of geologic conditions and mineral resources, with appropriate maps, within the area where mining is to be conducted; (3) A copy of a suitable map or aerial photograph showing the topography, the...

  15. Planning for Multiagent Using ASP-Prolog

    NASA Astrophysics Data System (ADS)

    Son, Tran Cao; Pontelli, Enrico; Nguyen, Ngoc-Hieu

    This paper presents an Answer Set Programming based approach to multiagent planning. The proposed methodology extends the action language \\cal B in [12] to represent and reason about plans with cooperative actions of an individual agent operating in a multiagent environment. This language is used to formalize multiagent planning problems and the notion of a joint plan for multiagent in the presence of cooperative actions. Finally, the paper presents a system for computing joint plans based on the ASP-Prolog system.

  16. Highway planning and operations for the Dallas district : freeway system plan methodology : summary

    DOT National Transportation Integrated Search

    1997-11-01

    The System Planning Methodology was developed jointly by the Texas Department of Transportation (TxDOT), North Central Texas Council of Governments (NCTCOG), Dallas Area Rapid Transit (DART), and Texas Transportation Institute (TTI) as a transportati...

  17. Joint Enabling Capabilities Command

    Science.gov Websites

    Executive Director Chief of Staff Joint Planning Support Element Joint Communications Support Element mission Joint Enabling Capabilities Command provides decisive joint communications, planning and public and responsive support for joint communications, planning and public affairs. Priorities * Deliver

  18. Operational Plan Ontology Model for Interconnection and Interoperability

    NASA Astrophysics Data System (ADS)

    Long, F.; Sun, Y. K.; Shi, H. Q.

    2017-03-01

    Aiming at the assistant decision-making system’s bottleneck of processing the operational plan data and information, this paper starts from the analysis of the problem of traditional expression and the technical advantage of ontology, and then it defines the elements of the operational plan ontology model and determines the basis of construction. Later, it builds up a semi-knowledge-level operational plan ontology model. Finally, it probes into the operational plan expression based on the operational plan ontology model and the usage of the application software. Thus, this paper has the theoretical significance and application value in the improvement of interconnection and interoperability of the operational plan among assistant decision-making systems.

  19. Shuttle operations era planning for flight operations

    NASA Technical Reports Server (NTRS)

    Holt, J. D.; Beckman, D. A.

    1984-01-01

    The Space Transportation System (STS) provides routine access to space for a wide range of customers in which cargos vary from single payloads on dedicated flights to multiple payloads that share Shuttle resources. This paper describes the flight operations planning process from payload introduction through flight assignment to execution of the payload objectives and the changes that have been introduced to improve that process. Particular attention is given to the factors that influence the amount of preflight preparation necessary to satisfy customer requirements. The partnership between the STS operations team and the customer is described in terms of their functions and responsibilities in the development of a flight plan. A description of the Mission Control Center (MCC) and payload support capabilities completes the overview of Shuttle flight operations.

  20. 78 FR 54305 - Joint Industry Plan; Notice of Filing of the Fifth Amendment to the National Market System Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70274; File No. 4-631] Joint Industry Plan; Notice of Filing of the Fifth Amendment to the National Market System Plan To Address Extraordinary Market Volatility by BATS Exchange, Inc., BATS Y-Exchange, Inc., Chicago Board Options Exchange, Incorporated, Chicago Stock Exchange, Inc., EDGA...

  1. Correlation-based regularization and gradient operators for (joint) inversion on unstructured meshes

    NASA Astrophysics Data System (ADS)

    Jordi, Claudio; Doetsch, Joseph; Günther, Thomas; Schmelzbach, Cedric; Robertsson, Johan

    2017-04-01

    When working with unstructured meshes for geophysical inversions, special attention should be paid to the design of the operators that are used for regularizing the inverse problem and coupling of different property models in joint inversions. Regularization constraints for inversions on unstructured meshes are often defined in a rather ad-hoc manner and usually only involve the cell to which the operator is applied and its direct neighbours. Similarly, most structural coupling operators for joint inversion, such as the popular cross-gradients operator, are only defined in the direct neighbourhood of a cell. As a result, the regularization and coupling length scales and strength of these operators depend on the discretization as well as cell sizes and shape. Especially for unstructured meshes, where the cell sizes vary throughout the model domain, the dependency of the operator on the discretization may lead to artefacts. Designing operators that are based on a spatial correlation model allows to define correlation length scales over which an operator acts (called footprint), reducing the dependency on the discretization and the effects of variable cell sizes. Moreover, correlation-based operators can accommodate for expected anisotropy by using different length scales in horizontal and vertical directions. Correlation-based regularization operators also known as stochastic regularization operators have already been successfully applied to inversions on regular grids. Here, we formulate stochastic operators for unstructured meshes and apply them in 2D surface and 3D cross-well electrical resistivity tomography data inversion examples of layered media. Especially for the synthetic cross-well example, improved inversion results are achieved when stochastic regularization is used instead of a classical smoothness constraint. For the case of cross-gradients operators for joint inversion, the correlation model is used to define the footprint of the operator and weigh

  2. NIF Operations Management Plan, August 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Wonterghem, Bruno M.

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to

  3. 76 FR 77431 - Decommissioning Planning During Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... (DG) DG-4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the.... The draft regulatory guide entitled, ``Decommissioning Planning During Operations,'' is temporarily..., 40, 50, 70, and 72 RIN 3150-AI55 [NRC-2011-0286; NRC-2008-0030] Decommissioning Planning During...

  4. 78 FR 663 - Decommissioning Planning During Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ...] Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Regulatory guide..., ``Decommissioning Planning During Operations.'' The guide describes a method that the NRC staff considers acceptable for use by holders of licenses in complying with the NRC's Decommissioning Planning Rule (DPR) (76 FR...

  5. 77 FR 41107 - Decommissioning Planning During Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ..., 40, 50, 70, and 72 [NRC-2011-0162] Decommissioning Planning During Operations AGENCY: Nuclear... (DG) 4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the NRC staff considers acceptable for use in complying with the NRC's Decommissioning Planning Rule. The NRC...

  6. Standing Joint Forces: Spearhead for Global Operational Maneuver

    DTIC Science & Technology

    2005-05-26

    Threat,” In The War Next Time: Countering Rogue States and Terrorists 1 20 NOVEMBER 2014 Operation Roundhouse was a resounding success. While...America’s " kick -down the door" force, capable of extremely rapid deployment from CONUS to anywhere in the world to ensure aerospace access for joint

  7. Joint Operating Environment 2035: The Joint Force in a Contested and Disordered World

    DTIC Science & Technology

    2016-07-14

    environment. Next, Section 2 explores how the intersection and interaction of these changes might impact the character of war in the future. Finally, Section...ideas about how changes to conflict and war might impact the capabilities and operational approaches required by the future Joint Force. These...1 Colin Gray, Another Bloody Century, (2005), p. 43. 2 challenges that will impact the

  8. 78 FR 58352 - Joint Industry Plan; Notice of Filing of Amendment No. 30 to the Joint Self-Regulatory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70429; File No. S7-24-89] Joint Industry Plan... Collection, Consolidation and Dissemination of Quotation and Transaction Information for Nasdaq-Listed... Exchange, Inc., New York Stock Exchange LLC, NYSE MKT LLC, and NYSE Arca, Inc. September 17, 2013. Pursuant...

  9. Pre-operative Asymptomatic Bacteriuria: A Risk Factor For Prosthetic Joint Infection?

    PubMed

    Weale, R; El-Bakri, F; Saeed, Kordo

    2018-04-13

    Infection is a rare complication following implantation of prosthetic material into a joint. The impact of asymptomatic bacteriuria (ASB) before elective operations and the subsequent risk of prosthetic joint infection (PJI) are not well understood. • Assess the prevalence of ASB amongst patients undergoing total arthroplasty of the hip and knee. • Determine the rates of PJI diagnosed within two years of the arthroplasty and if ASB is an independent risk factor for developing PJI. Patients who had total/unicondylar knee or total hip arthroplasty were retrospectively reviewed over a five-year period. Pre-operative urine samples within one year of surgery were analysed and those with ASB identified. Primary outcome was prosthetic joint infection (PJI) within the first postoperative year. 5542 patients were included. 4368 had a pre-operative urine culture recorded. The prevalence of ASB was 140 of 4368 (3.2%). The overall PJI rate was 56 of 5542 (1.01%). Of those with a PJI, 33 had a pre-operative urine sample recorded. The infection rate in the ASB group was 5% (7 of 140), in the no-ASB group it was 0.61% (26 of 4228) and in the group without a urine sample it was 1.96% (23 of 1174) (p value <0.001). The ASB isolate was the same microorganism as the PJI isolate in only one of the seven cases. The association between ASB and PJI is statistically significant, but the urine isolates did not relate to the isolates in the prosthetic joint, suggestive the relationship is unlikely causal. Copyright © 2018. Published by Elsevier Ltd.

  10. 30 CFR 780.11 - Operation plan: General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 780.11... PLAN § 780.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  11. 30 CFR 784.11 - Operation plan: General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 784.11... PLAN § 784.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  12. Irregular Warfare (IW) Joint Operating Concept (JOC), Version 1.0

    DTIC Science & Technology

    2007-09-11

    disruptive challenges. Key portions of the guidance relating to IW include: • Improving proficiency against irregular challenges. • Redefining past...12 Remarks at the Joint Worldwide Planning Conference, Edelweiss Conference Center Garmisch, Germany, 30 November...Requirements associated with GWOT and IW include: • Steady-state – deter and defend against external transnational terrorist attacks, enable

  13. A distributed planning concept for Space Station payload operations

    NASA Technical Reports Server (NTRS)

    Hagopian, Jeff; Maxwell, Theresa; Reed, Tracey

    1994-01-01

    The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

  14. 76 FR 13446 - Juniata Valley Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority Juniata Valley Railroad Company (JVRR... milepost 2.0 in Lewistown, Mifflin County, Pa. The line is owned or leased by SEDA-COG Joint Rail Authority (SEDA-COG). JVRR states that the line it proposes to operate is an extension of its existing line of...

  15. 76 FR 13445 - North Shore Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority North Shore Railroad Company (NSRR), a... milepost 2.0 in Berwick, Columbia County, Pa. The line is leased by SEDA-COG Joint Rail Authority (SEDA- COG). NSRR states that the line it proposes to operate is an extension of its existing line of...

  16. 76 FR 13445 - Lycoming Valley Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Railroad Company-Operation Exemption--SEDA--COG Joint Rail Authority Lycoming Valley Railroad Company (LVRR... milepost 0.4 in Muncy, Lycoming County, Pa. The line is owned or leased by SEDA-COG Joint Rail Authority (SEDA-COG). LVRR states that the line it proposes to operate is an extension of its existing line of...

  17. NASA deep space network operations planning and preparation

    NASA Technical Reports Server (NTRS)

    Jensen, W. N.

    1982-01-01

    The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.

  18. Operational Focused Simulation

    DTIC Science & Technology

    2009-12-01

    selected technologies. In order to build the scenario to fit the vignette, the Theater Battle Management Core System ( TBMCS ) databases were adjusted... TBMCS program provided an automated and integrated capability to plan and execute the air battle plan for the modeling and simulation efforts. TBMCS ...is the operational system of record for the Air and Space Operations Center Weapons System (AOC WS). TBMCS provides the Joint/Combined Forces Air

  19. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1990-01-01

    An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

  20. 36 CFR 9.9 - Plan of operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Plan of operations. 9.9 Section 9.9 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.9 Plan of operations. (a) No operations shall be conducted within any...

  1. 36 CFR 9.9 - Plan of operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Plan of operations. 9.9 Section 9.9 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.9 Plan of operations. (a) No operations shall be conducted within any...

  2. 36 CFR 9.9 - Plan of operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Plan of operations. 9.9 Section 9.9 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.9 Plan of operations. (a) No operations shall be conducted within any...

  3. 36 CFR 9.9 - Plan of operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Plan of operations. 9.9 Section 9.9 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.9 Plan of operations. (a) No operations shall be conducted within any...

  4. [Case control study of fractures-dislocations of ankle joint with conservative and operative treatment].

    PubMed

    Zhang, Song-Tu; Lin, Yi-Rong; Chen, Lian-Yuan

    2010-10-01

    To compare the clinical efficacy of grade III, IV supination-eversion fractures-dislocations of ankle joint between manipulative treatment and operative treatment. From September 2007 to December 2008, the clinical data of 60 patients with grade III, IV supination-eversion fractures-dislocations of ankle joint were retrospectively analyzed. There were 32 males and 28 females, ranging in age from 18 to 70 years with an average age of 38.17 years. All patients were respectively treated with manipulative treatment (conservative group, 30 cases) and operative treatment (operative group, 30 cases). The joint function was compared with Mazur standard; the reduction and shifting of fractures were observed with X-ray; the hospitalization day and the therapeutic cost were compared between two groups. All patients were followed up with an average of 15.27 months (ranged, 6 to 25 months). In conservative group, 16 cases got excellent result in joint function, 10 good, 3 fair, 1 poor; in operative group, 20 cases got excellent result, 8 good, 2 fair, 0 poor. In conservative group in the X-ray showed 25 cases obtained excellent and good reduction, 4 fair, 1 poor; and in operative group in the X-ray showed 28 cases obtained excellent and good reduction, 2 fair, 0 poor. There was no significant difference at the joint function and X-ray film after treatment between two groups (P > 0.05). The hospital day was respectively (7.87 +/- 3.34), (17.37 +/- 4.64) d in conservative group and operative group; and the therapeutic cost was respectively (2 506.67 +/- 649.10), (11 473.33 +/- 1 564.90) yuan. There was significant difference at hospital day and therapeutic cost between two groups (P < 0.05). Conservative treatment and operative treatment can both reach a very good result in treating grade III, IV supination-eversion fractures and dislocations of ankle joint. However, conservative treatment has advantage of high safety factor, low therapeutic cost, can reduce medical costs for

  5. Astrophysics science operations - Near-term plans and vision

    NASA Technical Reports Server (NTRS)

    Riegler, Guenter R.

    1991-01-01

    Astrophysics science operations planned by the Science Operations branch of NASA Astrophysics Division for the 1990s for the purpose of gathering spaceborne astronomical data are described. The paper describes the near-future plans of the Science Operations in the areas of the preparation of the proposal; the planning and execution of spaceborne observations; the collection, processing, and analysis data; and the dissemination of results. Also presented are concepts planned for introduction at the beginning of the 20th century, including the concepts of open communications, transparent instrument and observatory operations, a spiral requirements development method, and an automated research assistant.

  6. Post-operative bracing after ACL reconstruction has no effect on knee joint effusion. A prospective, randomized study.

    PubMed

    Lindström, Maria; Wredmark, Torsten; Wretling, Marie-Louise; Henriksson, Marketta; Felländer-Tsai, Li

    2015-12-01

    It is unclear what factors contribute to knee joint effusion after anterior cruciate ligament (ACL) injury and reconstruction. Knee homeostasis after injury and surgery is crucial for rehabilitation and knee well-being. We examined if effusion was affected by post-operative bracing, and if patients with effusion fit into a common profile. Patients were randomized to wearing or not wearing a post-operative brace for three weeks after ACL reconstruction with semitendinosus-gracilis tendons. Knee joint effusion was detected by computed tomography in 60 patients (22 women), before and three and 12 months after surgery. Joint effusion, clinical and subjective tests were analyzed. This is the first prospective, randomized study on post-operative bracing for patients with a semitendinosus-gracilis graft showed that bracing had no effect on three-months presence of joint effusion. Excessive joint effusion was present in 68% of the patients three months after surgery and was associated to prior meniscus injury (p=0.05) and higher prior Tegner activity level (p=0.006). We found a positive association between longer time from injury to surgery and joint effusion three months post-operatively (rho=0.29, p<0.05). Twelve months post-operatively, joint effusion had diminished to baseline levels. Subjective scores and activity levels were lower for women. Three-months joint effusion predicted lower final outcome scores in women. Prior meniscus injury and pre-injury Tegner activity levels are predictive significant variables for excessive knee joint effusion after ACL reconstruction. Post-operative bracing had no effect. A larger clinical cohort is needed to confirm findings of this logistic regression. Copyright © 2015 Elsevier B.V. All rights reserved.

  7. Automatic joint alignment measurements in pre- and post-operative long leg standing radiographs.

    PubMed

    Goossen, A; Weber, G M; Dries, S P M

    2012-01-01

    For diagnosis or treatment assessment of knee joint osteoarthritis it is required to measure bone morphometry from radiographic images. We propose a method for automatic measurement of joint alignment from pre-operative as well as post-operative radiographs. In a two step approach we first detect and segment any implants or other artificial objects within the image. We exploit physical characteristics and avoid prior shape information to cope with the vast amount of implant types. Subsequently, we exploit the implant delineations to adapt the initialization and adaptation phase of a dedicated bone segmentation scheme using deformable template models. Implant and bone contours are fused to derive the final joint segmentation and thus the alignment measurements. We evaluated our method on clinical long leg radiographs and compared both the initialization rate, corresponding to the number of images successfully processed by the proposed algorithm, and the accuracy of the alignment measurement. Ground truth has been generated by an experienced orthopedic surgeon. For comparison a second reader reevaluated the measurements. Experiments on two sets of 70 and 120 digital radiographs show that 92% of the joints could be processed automatically and the derived measurements of the automatic method are comparable to a human reader for pre-operative as well as post-operative images with a typical error of 0.7° and correlations of r = 0.82 to r = 0.99 with the ground truth. The proposed method allows deriving objective measures of joint alignment from clinical radiographs. Its accuracy and precision are on par with a human reader for all evaluated measurements.

  8. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1988-01-01

    An interactive graphical proximity operations planning system was developed, which allows on-site design of efficient, complex, multiburn maneuvers in a dynamic multispacecraft environment. Maneuvering takes place in and out of the orbital plane. The difficulty in planning such missions results from the unusual and counterintuitive character of orbital dynamics and complex time-varying operational constraints. This difficulty is greatly overcome by visualizing the relative trajectories and the relevant constraints in an easily interpretable graphical format, which provides the operator with immediate feedback on design actions. The display shows a perspective bird's-eye view of a Space Station and co-orbiting spacecraft on the background of the Station's orbital plane. The operator has control over the two modes of operation: a viewing system mode, which enables the exporation of the spatial situation about the Space Station and thus the ability to choose and zoom in on areas of interest; and a trajectory design mode, which allows the interactive editing of a series of way points and maneuvering burns to obtain a trajectory that complies with all operational constraints. A first version of this display was completed. An experimental program is planned in which operators will carry out a series of design missions which vary in complexity and constraints.

  9. Hoechst and Wacker plan joint venture in PVC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, I.

    1992-12-02

    Restructuring of Europe's petrochemical industry has taken a further step with the announcement that Hoechst (Frankfurt) and Wacker Chemie (Munich) are planning a joint venture in polyvinyl chloride (PVC). The venture would include production, R D, sales and marketing, plus both companies' PVC recycling activities. However, their vinyl chloride monomer (VCM) plants, and Hoechst's Kalle PVC film business, have been left out. Erich Schnitzler, head of Hoechst's PVC business unit, does not anticipate problems with the European Community's competition directorate. We are both among the middle-sized European PVC producers, and together we would have a 9%-10% market share. Our jointmore » venture would not limit competition. Both partners are hoping for approval from Brussels in first-quarter 1993. Hoechst has 255,000 m.t./year of PVC capacity at Gendorfand Knapsack, while Wacker has 365,000 m.t./year at Burghausen and Cologne. All the units, except Wacker's Cologne plant, are back integrated to VCM. The joint venture would buy VCM from the two parent companies and on the merchant market.« less

  10. Joint Seasonal ARMA Approach for Modeling of Load Forecast Errors in Planning Studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hafen, Ryan P.; Samaan, Nader A.; Makarov, Yuri V.

    2014-04-14

    To make informed and robust decisions in the probabilistic power system operation and planning process, it is critical to conduct multiple simulations of the generated combinations of wind and load parameters and their forecast errors to handle the variability and uncertainty of these time series. In order for the simulation results to be trustworthy, the simulated series must preserve the salient statistical characteristics of the real series. In this paper, we analyze day-ahead load forecast error data from multiple balancing authority locations and characterize statistical properties such as mean, standard deviation, autocorrelation, correlation between series, time-of-day bias, and time-of-day autocorrelation.more » We then construct and validate a seasonal autoregressive moving average (ARMA) model to model these characteristics, and use the model to jointly simulate day-ahead load forecast error series for all BAs.« less

  11. 14 CFR 136.13 - Helicopter performance plan and operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Helicopter performance plan and operations... Helicopter performance plan and operations. (a) Each operator must complete a performance plan before each helicopter commercial air tour, or flight operated under 14 CFR 91.146 or 91.147. The pilot in command must...

  12. 14 CFR 136.13 - Helicopter performance plan and operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Helicopter performance plan and operations... Helicopter performance plan and operations. (a) Each operator must complete a performance plan before each helicopter commercial air tour, or flight operated under 14 CFR 91.146 or 91.147. The pilot in command must...

  13. 14 CFR 136.13 - Helicopter performance plan and operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Helicopter performance plan and operations... Helicopter performance plan and operations. (a) Each operator must complete a performance plan before each helicopter commercial air tour, or flight operated under 14 CFR 91.146 or 91.147. The pilot in command must...

  14. Implications of the Joint Comprehensive Plan of Action

    NASA Astrophysics Data System (ADS)

    Perkovich, George

    2017-11-01

    This essay describes the background behind the July 2015 Joint Comprehensive Plan of Action that was negotiated to redress the crisis that had developed around Iran's nuclear activities, and summarizes some of the agreement's key features. The essay then highlights political and strategic factors that enabled the diplomatic breakthrough, and draws lessons that could inform approaches to future proliferation challenges. The conclusion suggests how some of the agreement's innovative features could be built upon and applied more broadly to reduce risks that civilian nuclear energy programs could be diverted for military purposes and to inform approaches to nuclear disarmament in the future.

  15. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  16. 7 CFR 1466.9 - EQIP plan of operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... General Provisions § 1466.9 EQIP plan of operations. (a) All conservation practices in the EQIP plan of... EQIP plan of operations must include: (1) A description of the participant's specific conservation and... for achieving the participant's conservation, natural resource, and environmental objectives; (3) A...

  17. 7 CFR 1466.9 - EQIP plan of operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... General Provisions § 1466.9 EQIP plan of operations. (a) All conservation practices in the EQIP plan of... EQIP plan of operations must include: (1) A description of the participant's specific conservation and... for achieving the participant's conservation, natural resource, and environmental objectives; (3) A...

  18. 7 CFR 1466.9 - EQIP plan of operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... General Provisions § 1466.9 EQIP plan of operations. (a) All conservation practices in the EQIP plan of... EQIP plan of operations must include: (1) A description of the participant's specific conservation and... for achieving the participant's conservation, natural resource, and environmental objectives; (3) A...

  19. 7 CFR 1466.9 - EQIP plan of operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... General Provisions § 1466.9 EQIP plan of operations. (a) All conservation practices in the EQIP plan of... EQIP plan of operations must include: (1) A description of the participant's specific conservation and... for achieving the participant's conservation, natural resource, and environmental objectives; (3) A...

  20. 7 CFR 1466.9 - EQIP plan of operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... General Provisions § 1466.9 EQIP plan of operations. (a) All conservation practices in the EQIP plan of... EQIP plan of operations must include: (1) A description of the participant's specific conservation and... for achieving the participant's conservation, natural resource, and environmental objectives; (3) A...

  1. Test, Control and Monitor System (TCMS) operations plan

    NASA Technical Reports Server (NTRS)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  2. Runway Operations Planning: A Two-Stage Solution Methodology

    NASA Technical Reports Server (NTRS)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. Thus, Runway Operations Planning (ROP) is a critical component of airport operations planning in general and surface operations planning in particular. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, may be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. Generating optimal runway operations plans was approached in with a 'one-stage' optimization routine that considered all the desired objectives and constraints, and the characteristics of each aircraft (weight class, destination, Air Traffic Control (ATC) constraints) at the same time. Since, however, at any given point in time, there is less uncertainty in the predicted demand for departure resources in terms of weight class than in terms of specific aircraft, the ROP problem can be parsed into two stages. In the context of the Departure Planner (OP) research project, this paper introduces Runway Operations Planning (ROP) as part of the wider Surface Operations Optimization (SOO) and describes a proposed 'two stage' heuristic algorithm for solving the Runway Operations Planning (ROP) problem. Focus is specifically given on including runway crossings in the planning process of runway operations. In the first stage, sequences of departure class slots and runwy crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the

  3. 36 CFR 9.37 - Plan of operations approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regional Director shall not approve a plan of operations: (1) Until the operator shows that the operations... Regional Director shall make an environmental analysis of such plan, and: (1) Notify the operator that the... specified by the Regional Director, he shall comply with § 9.37(b) (1) through (5). (c) The Regional...

  4. 36 CFR 9.37 - Plan of operations approval.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Regional Director shall not approve a plan of operations: (1) Until the operator shows that the operations... Regional Director shall make an environmental analysis of such plan, and: (1) Notify the operator that the... specified by the Regional Director, he shall comply with § 9.37(b) (1) through (5). (c) The Regional...

  5. 36 CFR 9.37 - Plan of operations approval.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Regional Director shall not approve a plan of operations: (1) Until the operator shows that the operations... Regional Director shall make an environmental analysis of such plan, and: (1) Notify the operator that the... specified by the Regional Director, he shall comply with § 9.37(b) (1) through (5). (c) The Regional...

  6. 36 CFR 9.37 - Plan of operations approval.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Regional Director shall not approve a plan of operations: (1) Until the operator shows that the operations... Regional Director shall make an environmental analysis of such plan, and: (1) Notify the operator that the... specified by the Regional Director, he shall comply with § 9.37(b) (1) through (5). (c) The Regional...

  7. TOPEX/POSEIDON joint verification plan

    NASA Technical Reports Server (NTRS)

    1992-01-01

    TOPEX/POSEIDON is a satellite mission that will use altimetry to make precise measurements of sea level with the primary goal of studying global ocean circulation. The mission is jointly conducted by the United States' National Aeronautics and Space Administration (NASA) and the French space agency, Centre National d'Etudes Spatiales (CNES). The current plans call for a launch of the satellite in August 1992. The primary mission will last 3 years, and provisions were made to extend the mission for an additional 2 years. The mission was coordinated with a number of international oceanographic and meteorological programs, including the World Ocean Circulation Experiment and the Tropical Ocean and Global Atmosphere Program, both of which are sponsored by the World Climate Research Program. The observations of TOPEX/POSEIDON are timed to provide a global perspective for interpreting the in situ measurements collected by these programs and in turn will be combined with observations of other satellites to achieve a global, four-dimensional description of the circulation of the world's oceans. In the autumn of 1987, an international team of 38 Principal Investigators was selected to participate in the mission. These scientists have been working closely with the TOPEX/POSEIDON Project to refine the mission design and science plans. During the first 6 months after launch, a number of these investigators will join with the project to conduct a wide range of oceanographic and geophysical investigations using the TOPEX/POSEIDON data. The purpose of these investigations is to demonstrate the scientific utility of the mission to the international scientific community.

  8. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    NASA Technical Reports Server (NTRS)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  9. 77 FR 8751 - Guidance for Decommissioning Planning During Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ..., 40, 50, 70, and 72 [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY... Guide, DG-4014, ``Decommissioning Planning During Operations'' in the Federal Register with a public... Guide DG-4014, ``Decommissioning Planning During Operations.'' This DG refers to NUREG-1757 Volume 3...

  10. 10 CFR 436.102 - General operations plan format and content.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false General operations plan format and content. 436.102... PROGRAMS Guidelines for General Operations Plans § 436.102 General operations plan format and content. (a... effective date of these guidelines, a general operations 10-year plan which shall consist of two parts, an...

  11. Crisis action planning and replanning using SIPE-2

    NASA Technical Reports Server (NTRS)

    Skidmore, Jennifer D.

    1993-01-01

    Rome Laboratory and DARPA are jointly sponsoring an initiative to develop the next generation of AI planning and scheduling technology focused on military operations planning, especially for crisis situations. SRI International has demonstrated their knowledge-based planning technology in this domain with a system called SOCAP, System for Operations Crisis Action Planning. SOCAP's underlying power comes from SIPE-2, a hierarchical, domain-independent, nonlinear AI planner also developed at SRI. This paper discusses the features of SIPE-2 that made it an ideal choice for military operations planning and which contributed greatly to SOCAP's success.

  12. 7 CFR 1465.6 - AMA plan of operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false AMA plan of operations. 1465.6 Section 1465.6... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS AGRICULTURAL MANAGEMENT ASSISTANCE General Provisions § 1465.6 AMA plan of operations. (a) All conservation practices in the APO must be approved by...

  13. Operations planning for Space Station Freedom - And beyond

    NASA Technical Reports Server (NTRS)

    Gibson, Stephen S.; Martin, Thomas E.; Durham, H. J.

    1992-01-01

    The potential of automated planning and electronic execution systems for enhancing operations on board Space Station Freedom (SSF) are discussed. To exploit this potential the Operations Planning and Scheduling Subsystem is being developed at the NASA Johnson Space Center. Such systems may also make valuable contributions to the operation of resource-constrained, long-duration space habitats of the future. Points that should be considered during the design of future long-duration manned space missions are discussed. Early development of a detailed operations concept as an end-to-end mission description offers a basis for iterative design evaluation, refinement, and option comparison, particularly when used with an advanced operations planning system capable of modeling the operations and resource constraints of the proposed designs.

  14. SDDOT transportation systems management & operations program plan.

    DOT National Transportation Integrated Search

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  15. Automated Planning and Scheduling for Planetary Rover Distributed Operations

    NASA Technical Reports Server (NTRS)

    Backes, Paul G.; Rabideau, Gregg; Tso, Kam S.; Chien, Steve

    1999-01-01

    Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

  16. Planning in the Continuous Operations Environment of the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa; Hagopian, Jeff

    1996-01-01

    The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

  17. Educational Pico-Satellite Project CUBESAT - University of Tokyo's CUBESAT XI and its Operation Plan

    NASA Astrophysics Data System (ADS)

    Tsuda, Y.; Sako, N.; Eishima, T.; Ito, T.; Arikawa, Y.; Miyamura, N.

    2002-01-01

    University of Tokyo ISSL (Intelligent Space Systems Laboratory) has been developing a pico-satellite called "CubeSat" as an international joint program. In CubeSat project, 10cm cubic satellites have been developed by several universities and launched to the low-earth orbit altogether by Russian rocket "Dnepr". ISSL has developed "XI" series ([sai]: X-factor Investigator) satellites, and the flight model is already fabricated and ready for delivery. The mission of XI satellite is the on-orbit technology demonstration of the ultra-small satellite bus system with an extensive use of commercial-off-the-shelf components. XI transmits the Morse beacon and FM packet telemetry which provides the health data of the satellite. Additionally, XI has a CMOS camera which provides 15,000 pixels panchromatic images as an advanced mission. Ground operation is one of the key issues for CubeSats. Now we are promoting international ground station network in which several universities' ground stations connected by internet collaboratively operate university-built small satellites, which enlarges the link opportunity. Collaboration with amateur HAM engineers is also indispensable for search for the satellite or get beacon signal to estimate the satellite orbit. We are now developing operation concept based on these ideas. As the launch is scheduled in this fall, the operation plan will be fixed at the time of this conference. In this presentation the final design of ISSL's CubeSat XI and operation plan will be presented.

  18. Joint Center for Operational Analysis Journal. Volume 12, Issue 2, Summer 2010

    DTIC Science & Technology

    2010-01-01

    Peixoto. In 19X7. then-Major Keen attended Bra- zil’s Command and General Staff Course in Rio de Janeiro . Bra- zil. In 1988, then Captain Floriano...controlling DoD office). • DISTRIBUTION STATEMENT E . Distribution authorized to DoD Components only (fill in reason) (date of determination). Other... basic joint functions that integrate, synchronize, and direct joint operations, which arc: command and control, intelligence, fires, movement and

  19. Planning actions in robot automated operations

    NASA Technical Reports Server (NTRS)

    Das, A.

    1988-01-01

    Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.

  20. Overview of Carbon Dioxide Control Issues During International Space Station/Space Shuttle Joint Docked Operations

    NASA Technical Reports Server (NTRS)

    Matty, Christopher M.

    2010-01-01

    Crewed space vehicles have a common requirement to remove the carbon dioxide (CO2) created by the metabolic processes of the crew. The space shuttle [Space Transportation System (STS)] and International Space Station (ISS) each have systems in place that allow control and removal of CO2 from the habitable cabin environment. During periods in which the space shuttle is docked to the ISS, known as "joint docked operations," the space shuttle and ISS share a common atmosphere environment. During this period, an elevated amount of CO2 is produced through the combined metabolic activity of the STS and ISS crews. This elevated CO2 production, together with the large effective atmosphere created by collective volumes of the docked vehicles, creates a unique set of requirements for CO2 removal. This paper will describe individual CO2 control plans implemented by STS and ISS engineering teams, as well as the integrated plans used when both vehicles are docked. The paper will also discuss some of the issues and anomalies experienced by both engineering teams.

  1. Overview of Carbon Dioxide Control Issues During International Space Station/Space Shuttle Joint Docked Operations

    NASA Technical Reports Server (NTRS)

    Matty, Christopher M.; Hayley, Elizabeth P.

    2009-01-01

    Manned space vehicles have a common requirement to remove the Carbon Dioxide (CO2) created by the metabolic processes of the crew. The Space Shuttle and International Space Station (ISS) each have systems in place to allow control and removal of CO2 from the habitable cabin environment. During periods where the Space Shuttle is docked to ISS, known as joint docked operations, the Space Shuttle and ISS share a common atmosphere environment. During this period there is an elevated production of CO2 caused by the combined metabolic activity of the Space Shuttle and ISS crew. This elevated CO2 production, combined with the large effective atmosphere created by the collective volumes of the docked vehicles, creates a unique set of requirements for CO2 removal. This paper will describe the individual CO2 control plans implemented by the Space Shuttle and ISS engineering teams, as well as the integrated plans used when both vehicles are docked. In addition, the paper will discuss some of the issues and anomalies experienced by both engineering teams.

  2. 76 FR 13446 - Nittany Bald and Eagle Railroad Company-Operation Exemption-SEDA-COG Joint Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Eagle Railroad Company-Operation Exemption-SEDA- COG Joint Rail Authority Nittany Bald and Eagle... 0.0 and milepost 1.8 in Castanea, Clinton County, Pa. The line is owned or leased by SEDA-COG Joint Rail Authority (SEDA-COG). N&BE states that the line it proposes to operate is an extension of its...

  3. Single stage treatment of ankylosis of the temporomandibular joint using patient-specific total joint replacement and virtual surgical planning.

    PubMed

    Haq, Jahrad; Patel, Nishma; Weimer, Katherine; Matthews, N Shaun

    2014-04-01

    Ankylosis of the temporomandibular joint (TMJ) is a debilitating condition that can result in pain, trismus, and a poor quality of life. It can be caused by injury, infection, and rheumatoid disease. Current management includes gap arthroplasty, interpositional arthroplasty, and reconstruction. Traditionally, joints are reconstructed using stock implants, or the procedure is done in two stages with an additional computed tomography (CT) scan between the resective and reconstructive procedures and use of stereolithographic models to aid the design of the definitive prostheses. We describe a technique for the resection of ankylosis and reconstruction of the joint in a single operation using virtually designed custom-made implants. Five patients with ankylosis of the TMJ had a single stage operation with reconstruction between 2010 and 2012. All had preoperative high-resolution CT with contrast angiography. During an international web-based teleconference between the surgeon and the engineer a virtual resection of the ankylosis was done using the reconstructed CT images. The bespoke cutting guides and implants were designed virtually at the same time and were then manufactured precisely using computer-aided design and manufacture (CAD-CAM) over 6 weeks. After release of the ankylosis and reconstruction, the patients underwent an exercise regimen to improve mouth opening. Follow-up was for a minimum of 6 months. Four patients had one operation, and one patient had two. Median/Mean maximum incisal opening increased from 0.6mm before operation to 25 mm afterwards (range 23-27), and there was minimal surgical morbidity. This new method effectively treats ankylosis of the TMJ in a single stage procedure. Fewer operations and hospital stays, and the maintenance of overall clinical outcome are obvious advantages. Crown Copyright © 2014. Published by Elsevier Ltd. All rights reserved.

  4. Advancing metropolitan planning for operations : the building blocks of a model transportation plan incorporating operations : a desk reference

    DOT National Transportation Integrated Search

    2010-04-01

    This publication is a resource designed to enable transportation planners and their planning partners to build a transportation plan that includes operations objectives, performance measures, and strategies that are relevant to their region, that ref...

  5. The Joint Tactical Aerial Resupply Vehicle Impact on Sustainment Operations

    DTIC Science & Technology

    2017-06-09

    Artificial Intelligence , Sustainment Operations, Rifle Company, Autonomous Aerial Resupply, Joint Tactical Autonomous Aerial Resupply System 16...Integrations and Development System AI Artificial Intelligence ARCIC Army Capabilities Integration Center ARDEC Armament Research, Development and...semi- autonomous systems, and fully autonomous systems. Autonomy of machines depends on sophisticated software, including Artificial Intelligence

  6. Diver Relative UUV Navigation for Joint Human-Robot Operations

    DTIC Science & Technology

    2013-09-01

    loop response: (10) where Kej is the gain that scales the position error to force . Substituting the measured values for ζ and ων as well as the...Underwater Vehicle; Tethered ; Hovering; Autonomous Underwater Vehicle; Joint human-robot operations; dynamic, uncertain environments 15. NUMBER OF PAGES...4   Figure 3.   The SeaBotix vLBV300 tethered AUV platform (left), and the planar vectored thruster

  7. Prototype integration of the joint munitions assessment and planning model with the OSD threat methodology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn, R.Y.S.; Bolmarcich, J.J.

    The purpose of this Memorandum is to propose a prototype procedure which the Office of Munitions might employ to exercise, in a supportive joint fashion, two of its High Level Conventional Munitions Models, namely, the OSD Threat Methodology and the Joint Munitions Assessment and Planning (JMAP) model. The joint application of JMAP and the OSD Threat Methodology provides a tool to optimize munitions stockpiles. The remainder of this Memorandum comprises five parts. The first is a description of the structure and use of the OSD Threat Methodology. The second is a description of JMAP and its use. The third discussesmore » the concept of the joint application of JMAP and OSD Threat Methodology. The fourth displays sample output of the joint application. The fifth is a summary and epilogue. Finally, three appendices contain details of the formulation, data, and computer code.« less

  8. Risk management in international manned space program operations.

    PubMed

    Seastrom, J W; Peercy, R L; Johnson, G W; Sotnikov, B J; Brukhanov, N

    2004-02-01

    New, innovative joint safety policies and requirements were developed in support of the Shuttle/Mir program, which is the first phase of the International Space Station program. This work has resulted in a joint multinational analysis culminating in joint certification for mission readiness. For these planning and development efforts, each nation's risk programs and individual safety practices had to be integrated into a comprehensive and compatible system that reflects the joint nature of the endeavor. This paper highlights the major incremental steps involved in planning and program integration during development of the Shuttle/Mir program. It traces the transition from early development to operational status and highlights the valuable lessons learned that apply to the International Space Station program (Phase 2). Also examined are external and extraneous factors that affected mission operations and the corresponding solutions to ensure safe and effective Shuttle/Mir missions. c2003 Published by Elsevier Ltd.

  9. Building a Better Trojan Horse: Emerging Army Roles in Joint Urban Operations

    DTIC Science & Technology

    2001-01-01

    Building a Better Trojan Horse : Emerging Army Roles in Joint Urban Operations A Monograph by MAJ Christopher H. Beckert Infantry, U.S. Army School...xx-xx-2000 to xx-xx-2000 5a. CONTRACT NUMBER 5b. GRANT NUMBER 4. TITLE AND SUBTITLE Building a Better Trojan Horse : Emerging Army Roles in Joint...TELEPHONE NUMBER International Area Code Area Code Telephone Number 703 767-9007 DSN 427-9007 2 Abstract BUILDING A BETTER TROJAN HORSE : EMERGING ARMY

  10. ISS Payload Operations: The Need for and Benefit of Responsive Planning

    NASA Technical Reports Server (NTRS)

    Nahay, Ed; Boster, Mandee

    2000-01-01

    International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of

  11. 76 FR 41307 - NASA Advisory Council; Space Operations Committee and Exploration Committee; Joint Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ... Operations Committee and Exploration Committee; Joint Meeting AGENCY: National Aeronautics and Space... the Space Operations Committee and Exploration Committee of the NASA Advisory Council. DATES: Tuesday.../Exploration Systems Mission Directorate Merger Update. [[Page 41308

  12. Managing Safety and Operations: The Effect of Joint Management System Practices on Safety and Operational Outcomes.

    PubMed

    Tompa, Emile; Robson, Lynda; Sarnocinska-Hart, Anna; Klassen, Robert; Shevchenko, Anton; Sharma, Sharvani; Hogg-Johnson, Sheilah; Amick, Benjamin C; Johnston, David A; Veltri, Anthony; Pagell, Mark

    2016-03-01

    The aim of this study was to determine whether management system practices directed at both occupational health and safety (OHS) and operations (joint management system [JMS] practices) result in better outcomes in both areas than in alternative practices. Separate regressions were estimated for OHS and operational outcomes using data from a survey along with administrative records on injuries and illnesses. Organizations with JMS practices had better operational and safety outcomes than organizations without these practices. They had similar OHS outcomes as those with operations-weak practices, and in some cases, better outcomes than organizations with safety-weak practices. They had similar operational outcomes as those with safety-weak practices, and better outcomes than those with operations-weak practices. Safety and operations appear complementary in organizations with JMS practices in that there is no penalty for either safety or operational outcomes.

  13. 76 FR 5231 - Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment No. 23 to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Organization Plan Governing the Collection, Consolidation and Dissemination of Quotation and Transaction...., EDGA Exchange, Inc., EDGX Exchange, Inc., Financial Industry Regulatory Authority, Inc., International... Joint Self-Regulatory Organization Plan Governing the Collection, Consolidation, and Dissemination of...

  14. Plant operation planning and scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jammar, R.J.

    When properly designed, planning and scheduling can actually add millions of dollars per year to the bottom line. Planning and scheduling is a continuum of decisions starting with crude selection and ending with establishing short-term targets for crude processing and blending. It also includes maintaining optimization and operation simulation models. It is thought that conservatively, a refinery may save from $5 million to $10 million a year if it pays more attention to the processes behind proper planning and scheduling. Of course, the amount of savings can reach staggering proportions for companies now at the bottom of the Solomon Associatesmore » Inc. refinery performance ranking.« less

  15. Operative tactics and results of treatment of patients with coxarthrosis secondary to congenital high luxation of hip joints.

    PubMed

    Król, Roman; Rojewski, Marek; Kamiński, Adam; Popławski, Tomasz

    2007-01-01

    Treatment of the sequelae of congenital high luxation of the hip joint is a major challenge in prosthetic surgery, demanding from the operator thorough familiarity with the problem and experience in hop reconstructive surgery. The results of 4 years observation, of the treatment of 14 woman in the average age of 38 years old with 18 hip joints with congenital high luxation are presented. In all cases cementless total hip arthroplasty was made. Acetabular component of the prosthesis was implanted correctly and stable in its physiological placement. Femur was shortened average 4 cm and stabilized by cementless press-fit stem of prosthesis. The place of femur osteotomy was covered with autogenic spongy bone from resected caput of femur. The union was achieved after average 10 weeks. In clinical assessment there were obtained 10 very good, 5 good and 3 satisfactory clinical results. There were no superficial or deep infections, no neurological disorders and no loosening of components of implanted prostheses observed. 1. Careful planning and carrying out the operative procedures allow to insert the acetabular component of the prosthesis in its physiological place and achieve good results. 2. Shortening of femur and repositioning of components of prosthesis in 90 degrees knee flexion and also position on broken bed after operative procedure allowed to avoid neurological disorders. 3. Cementless and hydroxyapatite-covered femoral component of the prosthesis correctly stabilize place of femur osteotomy.

  16. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    NASA Technical Reports Server (NTRS)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  17. Synergistic Approach Integrating Joint Capabilities for USSOCOM Contingency Contracting: Construction Management Module

    DTIC Science & Technology

    2010-12-01

    59 a. The Joint Uniform Lessons Learned System (JULLS) .........59 b. Acquisition Community Connection (ACC) ..........................59 c...Report ACC Acquisition Community Connection ADDIE Analyze, Design, Develop, Implement, Evaluate AFFARS Air Force Federal Acquisition Regulation...Operations J4 Logistics J5 Plans J6 Communications J8 Programming and Comptroller J&A Justification and Approval JARB Joint Acquisition

  18. Operation Urgent Fury - Grenada

    DTIC Science & Technology

    1983-11-01

    Urgent Fury : the planning and execution of joint operations in Grenada, 12 October-2 November 1983 / Ronald H. Cole. p . cm...meeting, Secretary of State George P . Shultz and the Chairman of the Joint Chiefs of Staff, General John W. Vessey, Jr., USA, warned the Special Situation...Group (RIG) of the National Security Council (NSC), on 12 October, Langhorne A. Motley, Assistant Secretary of State for Inter-American Affairs

  19. Saipan and Joint Operations

    DTIC Science & Technology

    1990-02-12

    following postwar joint education objectives for ths armed forces: Objective i: To oroduce within each component of the armed forces a general knowledge...had acquired the pradtical knowledge to establieh::thvoe Joint educational goals which are as relevant today as when they were written. ENDNOTES 1...F2:", (- 1-1 1’A I’rn ,r’ lqA ,! Vim l ;` thO? C’~~~~~~~ a m in A i h9%t ý A din r, a INi m i t z% "h e haa I.z a:wn naval. +ac! lit! es, line~i n+f

  20. 36 CFR 223.32 - Timber sale operating plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Timber sale operating plan... SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Timber Sale Contracts Contract Conditions and Provisions § 223.32 Timber sale operating plan. Sale contracts with a term of 2 years or more shall provide...

  1. 32 CFR 813.6 - Planning and requesting combat documentation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Joint Operation Planning and Execution System, that in turn, requests support from HQ AMC. HQ USAF can... 32 National Defense 6 2010-07-01 2010-07-01 false Planning and requesting combat documentation... SALES AND SERVICES VISUAL INFORMATION DOCUMENTATION PROGRAM § 813.6 Planning and requesting combat...

  2. Status of joint US/USSR experiments planned for the Cosmos '83 biosatellite mission

    NASA Technical Reports Server (NTRS)

    Souza, K. A.

    1982-01-01

    The plans and status of the fourth joint US/USSR biosatellite experiment, scheduled to be conducted in the last half of 1983, are discussed. These experiments will be conducted on board an unmanned Soviet spacecraft and will involve two restrained Rhesus monkeys and 10 pregnant rats, as well as a variety of small plant and radiation biology experiments. Three of the joint studies will use the monkeys for studies of biorhythms, calcium homeostasis, and the cardiovascular system. The fourth experiment will study rodent embryogenesis and neonatal behavior and development following in utero exposure to spaceflight. Specialized sensors and battery powered hardware have been designed, fabricated, and qualified for flight.

  3. Operation CASTLE. Operation Plan Number 3-53. March - May 1954,

    DTIC Science & Technology

    Nuclear radiation, *Nuclear explosions, *Radiation dosage, *Test methods, *Military operations, *Military planning, Radiobiology, Missions, Marshall Islands , Eniwetok Atoll, Bikini Atoll, Atmospheric physics, Low level, Radiation

  4. 77 FR 14047 - Guidance for Decommissioning Planning During Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ...)-4014, ``Decommissioning Planning During Operations.'' This action is necessary to correct the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; correction. SUMMARY: The U...

  5. Informed, advance refusals of treatment by people with severe mental illness in a randomised controlled trial of joint crisis plans: demand, content and correlates.

    PubMed

    Henderson, Claire; Farrelly, Simone; Flach, Clare; Borschmann, Rohan; Birchwood, Max; Thornicroft, Graham; Waheed, Waquas; Szmukler, George

    2017-11-24

    In the UK, crisis planning for mental health care should acknowledge the right to make an informed advance treatment refusal under the Mental Capacity Act 2005. Our aims were to estimate the demand for such treatment refusals within a sample of service users who had had a recent hospital admission for psychosis or bipolar disorder, and to examine the relationship between refusals, and service user characteristics. To identify refusals we conducted content analysis of Joint Crisis Plans, which are plans formulated by service users and their clinical team with involvement from an external facilitator, and routine care plans in sub-samples from a multi-centre randomised controlled trial of Joint Crisis Plans (plus routine mental health care) versus routine care alone (CRIMSON) in England. Factors hypothesised to be associated with refusals were identified using the trial data collected through baseline interviews of service users and clinicians and collection of routine clinical data. Ninety-nine of 221 (45%) of the Joint Crisis Plans contained a treatment refusal compared to 10 of 424 (2.4%) baseline routine care plans. No Joint Crisis Plans recorded disagreement with refusals on the part of clinicians. Among those with completed Joint Crisis Plans, adjusted analyses indicated a significant association between treatment refusals and perceived coercion at baseline (odds ratio = 1.21, 95% CI 1.02-1.43), but not with baseline working alliance or a past history of involuntary admission. We demonstrated significant demand for written treatment refusals in line with the Mental Capacity Act 2005, which had not previously been elicited by the process of treatment planning. Future treatment/crisis plans should incorporate the opportunity for service users to record a treatment refusal during the drafting of such plans. ISRCTN11501328 Registered 13th March 2008.

  6. Calcaneocuboid joint instability: a novel operative technique for anatomic reconstruction.

    PubMed

    Lohrer, Heinz; Arentz, Sabine

    2004-05-01

    A case history of a 13-year-old female national top-level gymnast, suffering from calcaneocuboid joint instability, is presented. The procedure was done as an anatomic repair by capsular reefing, which was augmented using a local periosteal flap. Initially, the athlete twisted her ankle. Clinical investigation revealed no sign of a lateral ankle ligament injury, but following this initial examination, recurrent giving-way of the foot occurred. She additionally felt significant but diffuse pain on the lateral side of the foot during loading in training and competition. For 2 months she was unable to run and conservative treatment failed. Diagnosis of a calcaneocuboid instability was established 4 months after the initial lesion by clinical and x-ray stress examination of the calcaneocuboid joint. Open surgery was successfully performed. Early functional posttreatment was done and the patient returned to full high-level gymnastics ability 16 weeks after surgery. Two years later, a similar injury occurred to the opposite calcaneocuboid joint and the same operative procedure again led to full sports ability.

  7. Science operations planning and implementation for Rosetta

    NASA Astrophysics Data System (ADS)

    Koschny, Detlef; Sweeney, Mark; Montagon, Elsa; Hoofs, Raymond; van der Plas, Peter

    2002-07-01

    The Rosetta mission is a cornerstone mission of the Horizon 2000 programme of the European Space Agency. It will be launched to comet 46P/Wirtanen in January 2003. This mission is the first of a series of planetary missions, including Mars Express, Smart-I (to the Moon), and BepiColombo (to Mercury). All these missions have similar requirements for their scientific operations. The Experiments H/W and S/W are developed by Principal Investigators, working at scientific institutes. They are also responsible for the operation of their experiments and for the generation of related operational documentation. The Science Operations Centre (SOC) has the task to consolidate the inputs of the different experimenters and the Lander and ensure that the resulting science operations timeline is free of conflicts. It forwards this timeline to the Mission Operations Centre (MOC) which combines the science operations with the operations of the other spacecraft subsystems and the orbit and attitude of the spacecraft. The MOC is also responsible for uplinking the operational command sequences to the spacecraft and for returning the received telemetry to the user. In a collaboration between the team of the Rosetta Project Scientist at the Research and Science Support Department of ESA/ESTEC and the European Space Operations Centre (ESA/ESOC), a concept for the SOC/MOC and their interfaces was developed for the Rosetta mission. This concept is generic enough to allow its implementation also for the other planetary missions. The design phase is now complete, and implementation is on-going. This paper briefly presents the architecture of the complex ground segment, concentrating on the elements required for planning of scientific operations, and then details the software tools EPS (Experiment Planning System) and PTB (Project Test Bed) which are used in the planning process.

  8. LANL continuity of operations plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Senutovitch, Diane M

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratorymore » EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support

  9. Grasp planning under uncertainty

    NASA Technical Reports Server (NTRS)

    Erkmen, A. M.; Stephanou, H. E.

    1989-01-01

    The planning of dexterous grasps for multifingered robot hands operating in uncertain environments is covered. A sensor-based approach to the planning of a reach path prior to grasping is first described. An on-line, joint space finger path planning algorithm for the enclose phase of grasping was then developed. The algorithm minimizes the impact momentum of the hand. It uses a Preshape Jacobian matrix to map task-level hand preshape requirements into kinematic constraints. A master slave scheme avoids inter-finger collisions and reduces the dimensionality of the planning problem.

  10. Applying analysis tools in planning for operations

    DOT National Transportation Integrated Search

    2009-09-01

    More and more, transportation system operators are seeing the benefits of strengthening links between planning and operations. A critical element in improving transportation decision-making and the effectiveness of transportation systems related to o...

  11. Spacelab operations planning. [ground handling, launch, flight and experiments

    NASA Technical Reports Server (NTRS)

    Lee, T. J.

    1976-01-01

    The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

  12. Joint Forces Command - Operation United Assistance Case Study: Lessons and Best Practices

    DTIC Science & Technology

    2016-07-01

    additional and prioritized computers and access in the operations center for these mission requirements are essential. 127 JFC-OUA CASE STUDY Issue...this publication is welcomed and highly encouraged. Joint Forces Command – Operation United Assistance Case Study JFC-OUA CASE STUDY iii Foreword...Based on information drawn from various sources including after action reports, lessons learned, case studies , umbrella-week visits, and key-leader

  13. Space Shuttle operational logistics plan

    NASA Technical Reports Server (NTRS)

    Botts, J. W.

    1983-01-01

    The Kennedy Space Center plan for logistics to support Space Shuttle Operations and to establish the related policies, requirements, and responsibilities are described. The Directorate of Shuttle Management and Operations logistics responsibilities required by the Kennedy Organizational Manual, and the self-sufficiency contracting concept are implemented. The Space Shuttle Program Level 1 and Level 2 logistics policies and requirements applicable to KSC that are presented in HQ NASA and Johnson Space Center directives are also implemented.

  14. Derivation of optimal joint operating rules for multi-purpose multi-reservoir water-supply system

    NASA Astrophysics Data System (ADS)

    Tan, Qiao-feng; Wang, Xu; Wang, Hao; Wang, Chao; Lei, Xiao-hui; Xiong, Yi-song; Zhang, Wei

    2017-08-01

    The derivation of joint operating policy is a challenging task for a multi-purpose multi-reservoir system. This study proposed an aggregation-decomposition model to guide the joint operation of multi-purpose multi-reservoir system, including: (1) an aggregated model based on the improved hedging rule to ensure the long-term water-supply operating benefit; (2) a decomposed model to allocate the limited release to individual reservoirs for the purpose of maximizing the total profit of the facing period; and (3) a double-layer simulation-based optimization model to obtain the optimal time-varying hedging rules using the non-dominated sorting genetic algorithm II, whose objectives were to minimize maximum water deficit and maximize water supply reliability. The water-supply system of Li River in Guangxi Province, China, was selected for the case study. The results show that the operating policy proposed in this study is better than conventional operating rules and aggregated standard operating policy for both water supply and hydropower generation due to the use of hedging mechanism and effective coordination among multiple objectives.

  15. Applying analysis tools in planning for operations : case study #3 -- using archived data as a tool for operations planning

    DOT National Transportation Integrated Search

    2009-09-01

    More and more, transportation system operators are seeing the benefits of strengthening links between planning and operations. A critical element in improving transportation decision-making and the effectiveness of transportation systems related to o...

  16. The joint operating company: an innovative approach to collaboration.

    PubMed

    Mason, S A; Seymour, D W

    1995-06-01

    Hospitals interested in horizontal integration often run into difficulties. In spite of otherwise sound business logic for two organizations to merge, there may be political, legal or financial reasons why a merger option cannot be pursued. Increasingly, enterprises are turning to a joint operating company structure as the solution to their needs. Scott A. Mason and Donald W. Seymour, partners with consulting firm National Health Advisors, explore situations where a JOC model of collaboration may be appropriate.

  17. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1989-01-01

    An interactive, graphical proximity operations planning system was developed which allows on-site design of efficient, complex, multiburn maneuvers in the dynamic multispacecraft environment about the space station. Maneuvering takes place in, as well as out of, the orbital plane. The difficulty in planning such missions results from the unusual and counterintuitive character of relative orbital motion trajectories and complex operational constraints, which are both time varying and highly dependent on the mission scenario. This difficulty is greatly overcome by visualizing the relative trajectories and the relative constraints in an easily interpretable, graphical format, which provides the operator with immediate feedback on design actions. The display shows a perspective bird's-eye view of the space station and co-orbiting spacecraft on the background of the station's orbital plane. The operator has control over two modes of operation: (1) a viewing system mode, which enables him or her to explore the spatial situation about the space station and thus choose and frame in on areas of interest; and (2) a trajectory design mode, which allows the interactive editing of a series of way-points and maneuvering burns to obtain a trajectory which complies with all operational constraints. Through a graphical interactive process, the operator will continue to modify the trajectory design until all operational constraints are met. The effectiveness of this display format in complex trajectory design is presently being evaluated in an ongoing experimental program.

  18. Joint crisis plans for people with borderline personality disorder: feasibility and outcomes in a randomised controlled trial.

    PubMed

    Borschmann, Rohan; Barrett, Barbara; Hellier, Jennifer M; Byford, Sarah; Henderson, Claire; Rose, Diana; Slade, Mike; Sutherby, Kim; Szmukler, George; Thornicroft, Graham; Hogg, Joanna; Moran, Paul

    2013-05-01

    People with borderline personality disorder frequently experience crises. To date, no randomised controlled trials (RCTs) of crisis interventions for this population have been published. To examine the feasibility of recruiting and retaining adults with borderline personality disorder to a pilot RCT investigating the potential efficacy and cost-effectiveness of using a joint crisis plan. An RCT of joint crisis plans for community-dwelling adults with borderline personality disorder (trial registration: ISRCTN12440268). The primary outcome measure was the occurrence of self-harming behaviour over the 6-month period following randomisation. Secondary outcomes included depression, anxiety, engagement and satisfaction with services, quality of life, well-being and cost-effectiveness. In total, 88 adults out of the 133 referred were eligible and were randomised to receive a joint crisis plan in addition to treatment as usual (TAU; n = 46) or TAU alone (n = 42). This represented approximately 75% of our target sample size and follow-up data were collected on 73 (83.0%) participants. Intention-to-treat analysis revealed no significant differences in the proportion of participants who reported self-harming (odds ratio (OR) = 1.9, 95% CI 0.53-6.5, P = 0.33) or the frequency of self-harming behaviour (rate ratio (RR) = 0.74, 95% CI 0.34-1.63, P = 0.46) between the two groups at follow-up. No significant differences were observed between the two groups on any of the secondary outcome measures or costs. It is feasible to recruit and retain people with borderline personality disorder to a trial of joint crisis plans and the intervention appears to have high face validity with this population. However, we found no evidence of clinical efficacy in this feasibility study.

  19. ICD Complex Operations and Maintenance Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  20. A universal six-joint robot controller

    NASA Technical Reports Server (NTRS)

    Bihn, D. G.; Hsia, T. C.

    1987-01-01

    A general purpose six-axis robotic manipulator controller was designed and implemented to serve as a research tool for the investigation of the practical and theoretical aspects of various control strategies in robotics. A 80286-based Intel System 310 running the Xenix operating servo software as well as the higher level software (e.g., kinematics and path planning) were employed. A Multibus compatible interface board was designed and constructed to handle I/O signals from the robot manipulator's joint motors. From the design point of view, the universal controller is capable of driving robot manipulators equipped with D.C. joint motors and position optical encoders. To test its functionality, the controller is connected to the joint motor D.C. power amplifier of a PUMA 560 arm bypassing completely the manufacturer-supplied Unimation controller. A controller algorithm consisting of local PD control laws was written and installed into the Xenix operating system. Additional software drivers were implemented to allow application programs access to the interface board. All software was written in the C language.

  1. Mechanisms of microregulation of private hospitals by health plan operators.

    PubMed

    Ugá, Maria Alicia Domínguez; Vasconcellos, Miguel Murat; Lima, Sheyla Maria Lemos; Portela, Margareth Crisóstomo; Gerschman, Silvia

    2009-10-01

    To analyze the mechanisms employed by health plan operators for microregulation of clinical management and health care qualification within care-providing hospitals. A nation-wide cross-sectional study was carried out. The universe consisted of hospitals which provided care to health plan operators in 2006. A sample of 83 units was selected, stratified by Brazilian macroregion and type of hospital. Data were obtained by means of a questionnaire administered to hospital managers. Microregulation of hospitals by health plan operators was minimal or almost absent in terms of health care qualification. Operator activity focused predominantly on intense control of the amount of services used by patients. Hospitals providing services to health plan operators did not constitute health micro-systems parallel or supplementary to the Sistema Unico de Saúde (SUS - Brazilian National Health System). The private care-providing hospitals were predominantly associated with SUS. However, these did not belong to a private care-provider network, even though their service usage was subject to strong regulation by health plan operators. Operator intervention in the form of system management was incipient or virtually absent. Roughly one-half of investigated hospitals reported adopting clinical directives, whereas only 25.4% reported managing pathology and 30.5% reported managing cases. Contractual relationships between hospitals and health plan operators are merely commercial contracts with little if any incorporation of aspects related to the quality of care, being generally limited to aspects such as establishment of prices, timeframes, and payment procedures.

  2. A methodology to enhance electromagnetic compatibility in joint military operations

    NASA Astrophysics Data System (ADS)

    Buckellew, William R.

    The development and validation of an improved methodology to identify, characterize, and prioritize potential joint EMI (electromagnetic interference) interactions and identify and develop solutions to reduce the effects of the interference are discussed. The methodology identifies potential EMI problems using results from field operations, historical data bases, and analytical modeling. Operational expertise, engineering analysis, and testing are used to characterize and prioritize the potential EMI problems. Results can be used to resolve potential EMI during the development and acquisition of new systems and to develop engineering fixes and operational workarounds for systems already employed. The analytic modeling portion of the methodology is a predictive process that uses progressive refinement of the analysis and the operational electronic environment to eliminate noninterfering equipment pairs, defer further analysis on pairs lacking operational significance, and resolve the remaining EMI problems. Tests are conducted on equipment pairs to ensure that the analytical models provide a realistic description of the predicted interference.

  3. An innovative approach to capability-based emergency operations planning

    PubMed Central

    Keim, Mark E

    2013-01-01

    This paper describes the innovative use information technology for assisting disaster planners with an easily-accessible method for writing and improving evidence-based emergency operations plans. This process is used to identify all key objectives of the emergency response according to capabilities of the institution, community or society. The approach then uses a standardized, objective-based format, along with a consensus-based method for drafting capability-based operational-level plans. This information is then integrated within a relational database to allow for ease of access and enhanced functionality to search, sort and filter and emergency operations plan according to user need and technological capacity. This integrated approach is offered as an effective option for integrating best practices of planning with the efficiency, scalability and flexibility of modern information and communication technology. PMID:28228987

  4. An innovative approach to capability-based emergency operations planning.

    PubMed

    Keim, Mark E

    2013-01-01

    This paper describes the innovative use information technology for assisting disaster planners with an easily-accessible method for writing and improving evidence-based emergency operations plans. This process is used to identify all key objectives of the emergency response according to capabilities of the institution, community or society. The approach then uses a standardized, objective-based format, along with a consensus-based method for drafting capability-based operational-level plans. This information is then integrated within a relational database to allow for ease of access and enhanced functionality to search, sort and filter and emergency operations plan according to user need and technological capacity. This integrated approach is offered as an effective option for integrating best practices of planning with the efficiency, scalability and flexibility of modern information and communication technology.

  5. Executive Report: JSOU (Joint Special Operations University) First Annual Symposium, 2-5 May 2006, Hurlburt Field, Florida

    DTIC Science & Technology

    2006-05-05

    NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Joint Special Operations University,357 Tully Street...Alison Building,Hurlburt Field,FL,32544 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR...leadership. JSOU is a subordinate organization of the US Special Operations Command (USSOCOM), MacDill Air Force Base, Florida. The mission of the Joint

  6. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  7. 43 CFR 3931.10 - Exploration plans and plans of development for mining and in situ operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for mining and in situ operations. 3931.10 Section 3931.10 Public Lands: Interior Regulations Relating....10 Exploration plans and plans of development for mining and in situ operations. (a) The POD must... development of the oil shale resources in the lease. (b) The operator must submit to the proper BLM office an...

  8. 43 CFR 3931.10 - Exploration plans and plans of development for mining and in situ operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for mining and in situ operations. 3931.10 Section 3931.10 Public Lands: Interior Regulations Relating....10 Exploration plans and plans of development for mining and in situ operations. (a) The POD must... development of the oil shale resources in the lease. (b) The operator must submit to the proper BLM office an...

  9. 43 CFR 3931.10 - Exploration plans and plans of development for mining and in situ operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for mining and in situ operations. 3931.10 Section 3931.10 Public Lands: Interior Regulations Relating....10 Exploration plans and plans of development for mining and in situ operations. (a) The POD must... development of the oil shale resources in the lease. (b) The operator must submit to the proper BLM office an...

  10. 43 CFR 3931.10 - Exploration plans and plans of development for mining and in situ operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... for mining and in situ operations. 3931.10 Section 3931.10 Public Lands: Interior Regulations Relating....10 Exploration plans and plans of development for mining and in situ operations. (a) The POD must... development of the oil shale resources in the lease. (b) The operator must submit to the proper BLM office an...

  11. Ulysses operations at Jupiter - Planning for the unknown

    NASA Technical Reports Server (NTRS)

    Angold, N.; Beech, P.; Garcia-Perez, R.; Mcgarry, A.; Standley, S.

    1992-01-01

    The operational preparations for the Ulysses encounter with Jupiter are described with particular attention given to requirements for survival in the Jovian environment, ground-segment planning, a deep-space network, and encounter activities. It is concluded that the successful operation of the Ulysses spacecraft at Jupiter was the culmination of many years of activity, from spacecraft design and mission planning to the coordination of the encounter activities and production of the detailed timeline.

  12. Joint Personnel Recovery Agency Joint Center for Operational Analysis and Lessons Learned Quarterly Bulletin, Volume 7, Issue 2, March 2005

    DTIC Science & Technology

    2005-03-01

    execute these dangerous and uncertain missions. iv In my recent travels in the U.S. Central Command area of operations I had the great fortune of meeting...jfcom.mil 1Joint Center for Operational Analysis and Lessons Learned (JCOA-LL) Bulletin “That others may live…to return with honor” The old Chinese ...information has to travel to meet GCC staff requirements increases the difficulty in handling and maintaining situational awareness on PR events

  13. 7 CFR 272.2 - Plan of operation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 60 days prior to implementation. Minor changes to approved sampling plans shall be submitted at least... Plan of Operation. The State and FNS (USDA) further agree to fully comply with any changes in Federal... effect that, no person in the United States shall, on the grounds of sex, race, color, age, political...

  14. 7 CFR 272.2 - Plan of operation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 60 days prior to implementation. Minor changes to approved sampling plans shall be submitted at least... Plan of Operation. The State and FNS (USDA) further agree to fully comply with any changes in Federal... effect that, no person in the United States shall, on the grounds of sex, race, color, age, political...

  15. 7 CFR 272.2 - Plan of operation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 60 days prior to implementation. Minor changes to approved sampling plans shall be submitted at least... Plan of Operation. The State and FNS (USDA) further agree to fully comply with any changes in Federal... effect that, no person in the United States shall, on the grounds of sex, race, color, age, political...

  16. 78 FR 54321 - Joint Industry Plan; Notice of Filing and Immediate Effectiveness of the Fourth Amendment to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70273; File No. 4-631] Joint Industry Plan; Notice of Filing and Immediate Effectiveness of the Fourth Amendment to the National Market System Plan To Address Extraordinary Market Volatility by BATS Exchange, Inc., BATS Y- Exchange, Inc., Chicago Board Options Exchange, Incorporated, Chicago...

  17. 78 FR 13113 - Joint Industry Plan; Notice of Filing and Immediate Effectiveness of the Second Amendment to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-68953; File No. 4-631] Joint Industry Plan; Notice of Filing and Immediate Effectiveness of the Second Amendment to the National Market System Plan To Address Extraordinary Market Volatility by BATS Exchange, Inc., BATS Y- Exchange, Inc., Chicago Board Options Exchange, Incorporated, Chicago...

  18. 30 CFR 250.290 - What operations require approval of the Conceptual Plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information Deepwater Operations Plans (dwop) § 250.290 What operations require approval of the Conceptual Plan? You may... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What operations require approval of the...

  19. Petroleum refinery operational planning using robust optimization

    NASA Astrophysics Data System (ADS)

    Leiras, A.; Hamacher, S.; Elkamel, A.

    2010-12-01

    In this article, the robust optimization methodology is applied to deal with uncertainties in the prices of saleable products, operating costs, product demand, and product yield in the context of refinery operational planning. A numerical study demonstrates the effectiveness of the proposed robust approach. The benefits of incorporating uncertainty in the different model parameters were evaluated in terms of the cost of ignoring uncertainty in the problem. The calculations suggest that this benefit is equivalent to 7.47% of the deterministic solution value, which indicates that the robust model may offer advantages to those involved with refinery operational planning. In addition, the probability bounds of constraint violation are calculated to help the decision-maker adopt a more appropriate parameter to control robustness and judge the tradeoff between conservatism and total profit.

  20. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  1. Beyond Coordination: Joint Planning and Program Execution. The IHPRPT Materials Working Group

    NASA Technical Reports Server (NTRS)

    Stropki, Michael A.; Cleyrat, Danial A.; Clinton, Raymond G., Jr.; Rogacki, John R. (Technical Monitor)

    2000-01-01

    "Partnership is more than just coordination," stated then-Commander of the Air Force Research Laboratory (AFRL), Major General Dick Paul (USAF-Ret), at this year's National Space and Missile Materials Symposium. His comment referred to the example of the joint planning and program execution provided by the Integrated High Payoff Rocket Propulsion Technology (IHPRPT) Materials Working Group (IMWG). Most people agree that fiscal pressures imposed by shrinking budgets have made it extremely difficult to build upon our existing technical capabilities. In times of sufficient budgets, building advanced systems poses no major difficulties. However, with today's budgets, realizing enhanced capabilities and developing advanced systems often comes at an unaffordable cost. Overcoming this problem represents both a challenge and an opportunity to develop new business practices that allow us to develop advanced technologies within the restrictions imposed by current funding levels. Coordination of technology developments between different government agencies and organizations is a valuable tool for technology transfer. However, rarely do the newly developed technologies have direct applicability to other ongoing programs. Technology requirements are typically determined up-front during the program planning stage so that schedule risk can be minimized. The problem with this process is that the costs associated with the technology development are often borne by a single program. Additionally, the potential exists for duplication of technical effort. Changing this paradigm is a difficult process but one that can be extremely worthwhile should the right opportunity arise. The IMWG is one such example where NASA, the DoD, and industry have developed joint requirements that are intended to satisfy multiple program needs. More than mere coordination, the organizations comprising the group come together as partners, sharing information and resources, proceeding from a joint roadmap.

  2. Joint Center for Operational Analysis Quarterly Bulletin. Volume 8, Issue 3, September 2006

    DTIC Science & Technology

    2006-09-01

    Kuwait drove planning for Operation Desert Storm. The Dayton Peace Accord included an agreement by warring factions not to attack coalition forces as they...informants.29 Pinpointing the insurgent strongholds substantially helps the military shape its plan of attack. The government prepares the political...campaign plan . The use of informants, sting operations, and undercover internal affairs officers to name the most salient means, is effective in

  3. GTC Science Operations and Instrumentation Plan

    NASA Astrophysics Data System (ADS)

    Cabrera-Lavers, A.

    2017-03-01

    The 10.4 m Gran Telescopio CANARIAS came into operation in 2009, and now we can clearly state without any doubt that we have in our hands an extraordinary tool to produce science with all its capabilities and functionalities operating under specs. This contribution summarizes the current status of the night operation of the telescope and describe GTC short- and medium- term instrumentation plan, that will make possible to provide access up to five different instruments to the users community from middle 2017, largely enhancing the scientific return from the telescope.

  4. NAS operational evolution plan : a foundation for capacity enhancement 2001-2010

    DOT National Transportation Integrated Search

    2001-06-01

    This series of World Wide Web slides focuses on the Operational Evolution Plan, which is a 10-year plan for aviation operational improvements to increase capacity and safety in the United States. This plan is unique in that it integrates all actions:...

  5. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility studymore » (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.« less

  6. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  7. Training Community Modeling and Simulation Business Plan: 2008 Edition

    DTIC Science & Technology

    2009-12-01

    Collaborative information environment. Collaborative tools will help CCDRs and joint staffs plan and disseminate operations, link the staffs to subject matter...anticipating direct and indirect effects as they propagate through political, military, economic, sociological, and information infrastructures. Capabilities...will also 5-11 enhance training for joint staffs and task forces; crisis management; JUO; information warfare; interagency, intergovernmental, and

  8. Towards computer-assisted surgery in shoulder joint replacement

    NASA Astrophysics Data System (ADS)

    Valstar, Edward R.; Botha, Charl P.; van der Glas, Marjolein; Rozing, Piet M.; van der Helm, Frans C. T.; Post, Frits H.; Vossepoel, Albert M.

    A research programme that aims to improve the state of the art in shoulder joint replacement surgery has been initiated at the Delft University of Technology. Development of improved endoprostheses for the upper extremities (DIPEX), as this effort is called, is a clinically driven multidisciplinary programme consisting of many contributory aspects. A part of this research programme focuses on the pre-operative planning and per-operative guidance issues. The ultimate goal of this part of the DIPEX project is to create a surgical support infrastructure that can be used to predict the optimal surgical protocol and can assist with the selection of the most suitable endoprosthesis for a particular patient. In the pre-operative planning phase, advanced biomechanical models of the endoprosthesis fixation and the musculo-skeletal system of the shoulder will be incorporated, which are adjusted to the individual's morphology. Subsequently, the support infrastructure must assist the surgeon during the operation in executing his surgical plan. In the per-operative phase, the chosen optimal position of the endoprosthesis can be realised using camera-assisted tools or mechanical guidance tools. In this article, the pathway towards the desired surgical support infrastructure is described. Furthermore, we discuss the pre-operative planning phase and the per-operative guidance phase, the initial work performed, and finally, possible approaches for improving prosthesis placement.

  9. Army Transportation Systems in a Twenty-First Century Joint Operational Environment

    DTIC Science & Technology

    2013-03-01

    182, C-20B, 0-2A, T-34, TG-14, U-21, UV-18, UV-20, UC -35, and T-6 fixed-wing aircraft. This fleet totals 2,799 airframes, distributed to all of the...Sealift Command ( MSC ) fielded the first of ten projected Joint High Speed Vessels (JHSV) in February 2013. The JHSV can move 600 tons over 1,200...110 14 Merchant Marine crewed ships under MSC control.36 This initiative prompted the Army to cancel its plan to procure seven JSHV on its own

  10. 76 FR 22648 - Resolution Plans and Credit Exposure Reports Required

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ..., including associated services, functions and support that, in the view of the Covered Company or as jointly...-based Covered Company's overall contingency planning process, and information regarding the.... operations be linked to the contingency planning process of the foreign-based Covered Company? Process 1. Are...

  11. 76 FR 5227 - Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment No. 24 to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Organization Plan Governing the Collection, Consolidation and Dissemination of Quotation and Transaction...., EDGA Exchange, Inc., EDGX Exchange, Inc., Financial Industry Regulatory Authority, Inc., International... Joint Self- [[Page 5228

  12. 24 CFR 943.144 - What financial impact do operations of a subsidiary, affiliate, or joint venture have on a PHA?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of a subsidiary, affiliate, or joint venture have on a PHA? 943.144 Section 943.144 Housing and Urban... CONSORTIA AND JOINT VENTURES Subsidiaries, Affiliates, Joint Ventures in Public Housing § 943.144 What financial impact do operations of a subsidiary, affiliate, or joint venture have on a PHA? Income generated...

  13. Multi-objective evolutionary optimization for the joint operation of reservoirs of water supply under water-food-energy nexus management

    NASA Astrophysics Data System (ADS)

    Uen, T. S.; Tsai, W. P.; Chang, F. J.; Huang, A.

    2016-12-01

    In recent years, urbanization had a great effect on the growth of population and the resource management scheme of water, food and energy nexus (WFE nexus) in Taiwan. Resource shortages of WFE become a long-term and thorny issue due to the complex interactions of WFE nexus. In consideration of rapid socio-economic development, it is imperative to explore an efficient and practical approach for WFE resources management. This study aims to search the optimal solution to WFE nexus and construct a stable water supply system for multiple stakeholders. The Shimen Reservoir and Feitsui Reservoir in northern Taiwan are chosen to conduct the joint operation of the two reservoirs for water supply. This study intends to achieve water resource allocation from the two reservoirs subject to different operating rules and restrictions of resource allocation. The multi-objectives of the joint operation aim at maximizing hydro-power synergistic gains while minimizing water supply deficiency as well as food shortages. We propose to build a multi-objective evolutionary optimization model for analyzing the hydro-power synergistic gains to suggest the most favorable solutions in terms of tradeoffs between WFE. First, this study collected data from two reservoirs and Taiwan power company. Next, we built a WFE nexus model based on system dynamics. Finally, this study optimized the joint operation of the two reservoirs and calculated the synergy of hydro-power generation. The proposed methodology can tackle the complex joint reservoir operation problems. Results can suggest a reliable policy for joint reservoir operation for creating a green economic city under the lowest risks of water supply.

  14. Application of genetic algorithm in integrated setup planning and operation sequencing

    NASA Astrophysics Data System (ADS)

    Kafashi, Sajad; Shakeri, Mohsen

    2011-01-01

    Process planning is an essential component for linking design and manufacturing process. Setup planning and operation sequencing is two main tasks in process planning. Many researches solved these two problems separately. Considering the fact that the two functions are complementary, it is necessary to integrate them more tightly so that performance of a manufacturing system can be improved economically and competitively. This paper present a generative system and genetic algorithm (GA) approach to process plan the given part. The proposed approach and optimization methodology analyses the TAD (tool approach direction), tolerance relation between features and feature precedence relations to generate all possible setups and operations using workshop resource database. Based on these technological constraints the GA algorithm approach, which adopts the feature-based representation, optimizes the setup plan and sequence of operations using cost indices. Case study show that the developed system can generate satisfactory results in optimizing the setup planning and operation sequencing simultaneously in feasible condition.

  15. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    NASA Technical Reports Server (NTRS)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  16. Geronimo: Planning Considerations for Employing Airborne Forces

    DTIC Science & Technology

    2017-05-25

    Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that... operation , a planner must adhere to joint planning considerations and understand the Air Force and Army requirements. Today the Army maintains only...one brigade and two battalions of deployable conventional airborne combat power. The special operations community also is airborne capable, and the

  17. Distributed Operations Planning

    NASA Technical Reports Server (NTRS)

    Fox, Jason; Norris, Jeffrey; Powell, Mark; Rabe, Kenneth; Shams, Khawaja

    2007-01-01

    Maestro software provides a secure and distributed mission planning system for long-term missions in general, and the Mars Exploration Rover Mission (MER) specifically. Maestro, the successor to the Science Activity Planner, has a heavy emphasis on portability and distributed operations, and requires no data replication or expensive hardware, instead relying on a set of services functioning on JPL institutional servers. Maestro works on most current computers with network connections, including laptops. When browsing down-link data from a spacecraft, Maestro functions similarly to being on a Web browser. After authenticating the user, it connects to a database server to query an index of data products. It then contacts a Web server to download and display the actual data products. The software also includes collaboration support based upon a highly reliable messaging system. Modifications made to targets in one instance are quickly and securely transmitted to other instances of Maestro. The back end that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

  18. 36 CFR 292.67 - Operating plan approval-outstanding mineral rights.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-outstanding mineral rights. 292.67 Section 292.67 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Outstanding Mineral Rights § 292.67 Operating plan approval—outstanding mineral rights. (a) Upon receipt of an operating plan...

  19. 36 CFR 292.67 - Operating plan approval-outstanding mineral rights.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-outstanding mineral rights. 292.67 Section 292.67 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Outstanding Mineral Rights § 292.67 Operating plan approval—outstanding mineral rights. (a) Upon receipt of an operating plan...

  20. 36 CFR 292.67 - Operating plan approval-outstanding mineral rights.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-outstanding mineral rights. 292.67 Section 292.67 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Outstanding Mineral Rights § 292.67 Operating plan approval—outstanding mineral rights. (a) Upon receipt of an operating plan...

  1. 36 CFR 292.67 - Operating plan approval-outstanding mineral rights.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-outstanding mineral rights. 292.67 Section 292.67 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Outstanding Mineral Rights § 292.67 Operating plan approval—outstanding mineral rights. (a) Upon receipt of an operating plan...

  2. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    NASA Technical Reports Server (NTRS)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  3. Joint Urban Operations

    DTIC Science & Technology

    2009-11-08

    travel routes, holidays, festivals, sports, and other events; climate and weather; and water. Planning Planning must give appropriate weight...they can be manipulated rather easily, they are militarily significant. (1) Physical patterns such as market locations and travel routes may provide...cycle, cutting or controlling intercity and intracity mobility and communications, triggering an adversary response, or positioning forces to conduct

  4. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Who oversees operations under my welding plan... SHELF General Performance Standards § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person...

  5. AIS ASM Operational Integration Plan

    DTIC Science & Technology

    2013-08-01

    al. | Public August 2013 This page intentionally left blank. AIS ASM Operational Integration Plan v ...that supply AIS Routers as part of their AIS shoreside network software : Kongsberg C-Scope, Gatehouse AIS, Transas AIS Network, and CNS DataSwitch...commercial systems would be suitable for the current USCG traffic conditions. The ASM Manager is software that adds the required queuing and

  6. Electric Vehicle Sharing Planning and Operations

    DOT National Transportation Integrated Search

    2018-02-01

    Dongfang Zhao (ORCID ID 0000-0002-5424-9915); Xiaopeng (Shaw) Li (ORCID ID 0000-0002-5264-3775); Yu Zhang (ORCID ID 0000-0003-1202-626X) This project includes literature review and proposing a model for EV planning and operations. We first conducted ...

  7. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Who oversees operations under my welding plan... § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder is...

  8. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Who oversees operations under my welding plan... Performance Standards § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that...

  9. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Who oversees operations under my welding plan... Performance Standards § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that...

  10. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Who oversees operations under my welding plan... Performance Standards § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that...

  11. 7 CFR 636.8 - WHIP plan of operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WILDLIFE HABITAT INCENTIVE PROGRAM § 636.8 WHIP plan of... plan of operations encompasses the parcel of land where habitat will be established, improved... one of the following as determined by NRCS: (1) Fish and wildlife habitat conditions that are of...

  12. 7 CFR 636.8 - WHIP plan of operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WILDLIFE HABITAT INCENTIVE PROGRAM § 636.8 WHIP plan of... plan of operations encompasses the parcel of land where habitat will be established, improved... one of the following as determined by NRCS: (1) Fish and wildlife habitat conditions that are of...

  13. 7 CFR 636.8 - WHIP plan of operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WILDLIFE HABITAT INCENTIVE PROGRAM § 636.8 WHIP plan of... plan of operations encompasses the parcel of land where habitat will be established, improved... one of the following as determined by NRCS: (1) Fish and wildlife habitat conditions that are of...

  14. 7 CFR 636.8 - WHIP plan of operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WILDLIFE HABITAT INCENTIVE PROGRAM § 636.8 WHIP plan of... plan of operations encompasses the parcel of land where habitat will be established, improved... one of the following as determined by NRCS: (1) Fish and wildlife habitat conditions that are of...

  15. Benefits to blood banks of a sales and operations planning process.

    PubMed

    Keal, Donald A; Hebert, Phil

    2010-12-01

    A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line. © 2010 American Association of Blood Banks.

  16. 42 CFR 37.100 - Coal mine operator plan for medical examinations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Coal mine operator plan for medical examinations... MEDICAL CARE AND EXAMINATIONS SPECIFICATIONS FOR MEDICAL EXAMINATIONS OF COAL MINERS General Requirements § 37.100 Coal mine operator plan for medical examinations. (a) Each coal mine operator must submit and...

  17. A Quantitative Exposure Planning Tool for Surgical Approaches to the Sacroiliac Joint.

    PubMed

    Phelps, Kevin D; Ming, Bryan W; Fox, Wade E; Bellamy, Nelly; Sims, Stephen H; Karunakar, Madhav A; Hsu, Joseph R

    2016-06-01

    To aid in surgical planning by quantifying and comparing the osseous exposure between the anterior and posterior approaches to the sacroiliac joint. Anterior and posterior approaches were performed on 12 sacroiliac joints in 6 fresh-frozen torsos. Visual and palpable access to relevant surgical landmarks was recorded. Calibrated digital photographs were taken of each approach and analyzed using Image J. The average surface areas of exposed bone were 44 and 33 cm for the anterior and posterior approaches, respectively. The anterior iliolumbar ligament footprint could be visualized in all anterior approaches, whereas the posterior aspect could be visualized in all but one posterior approach. The anterior approach provided visual and palpable access to the anterior superior edge of the sacroiliac joint in all specimens, the posterior superior edge in 75% of specimens, and the inferior margin in 25% and 50% of specimens, respectively. The inferior sacroiliac joint was easily visualized and palpated in all posterior approaches, although access to the anterior and posterior superior edges was more limited. The anterior S1 neuroforamen was not visualized with either approach and was more consistently palpated when going posterior (33% vs. 92%). Both anterior and posterior approaches can be used for open reduction of pure sacroiliac dislocations, each with specific areas for assessing reduction. In light of current plate dimensions, fractures more than 2.5 cm lateral to the anterior iliolumbar ligament footprint are amenable to anterior plate fixation, whereas those more medial may be better addressed through a posterior approach.

  18. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    NASA Technical Reports Server (NTRS)

    Hall, Timothy A.

    2011-01-01

    In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow

  19. 36 CFR 228.56 - Operating plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Operating plans. 228.56 Section 228.56 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE MINERALS... the environment and improvements, including timely reclamation of disturbed lands. Significant changes...

  20. 36 CFR 228.56 - Operating plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Operating plans. 228.56 Section 228.56 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE MINERALS... the environment and improvements, including timely reclamation of disturbed lands. Significant changes...

  1. [Application of temporomandibular joint dics reduction in the operation of condylar sagittal fracture].

    PubMed

    Wenli, Zeng; Wuchao, Zhou; Jingkun, Zhang; Yisen, Shao; Weihong, Xi

    2017-10-01

    To explore the selection of temporomandibular joint (TMJ) disc reduction and fixation methods in condylar sagittal fracture surgery. A total of 36 patients with condylar fractures were chosen. The follow-up period was more 6 months. All 36 cases of condylar sagittal fracture were fixed with long screw. In the operation, the displaced joint disc was repositioned and fixed. The fixed method included direct suture (22 cases) and anchorage (14 cases). Clinical followups were performed before surgery and 1 month, 3 months, 6 months and 1 year after surgery. Clinicians recorded data related to the Fricton craniomandibular index (CMI) and evaluated the postoperative joint function during followup before surgery and 6 months after surgery. In both groups, function of TMJ significantly improved after surgery. The CMI decreased from 0.213±0.162 and 0.273±0.154 to 0.059±0.072 and 0.064±0.068 (P<0.05), respectively. No statistical difference was observed between the two groups in palpation index (PI), dysfunction index (DI) and CMI (P>0.05) before or after surgery. Both methods could effectively improve the dysfunction of the TMJ caused by trauma. The selection of joint disc reduction and fixation methods is based on the displacement and damage degree of the joint disc.

  2. Joint Operation Planning and Execution

    DTIC Science & Technology

    1992-03-01

    Review Force Cargo Category Record ............. 261 Review Cargo Details ........................... 262 Tailor Force Record...shown. Tailor Force Cargo, Figure 7.11, is displayed. 261 <Xmit> to accept the update as shown. Tailor Force Cargo, Figure 7.11, is displayed. To review...8217 ZARZS TUNSA P 4S IAP DI’J ENTER FFPN,NPINPF!N,LP/,NPA3E ,. 2,ENr. Figure 12.8 GEOFILE Display After reviewing Figure 12.8, navigate back to the GEOFILE

  3. 36 CFR 292.64 - Plan of operations-approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Plan of operations-approval. 292.64 Section 292.64 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Locatable Minerals § 292.64 Plan of...

  4. 36 CFR 292.64 - Plan of operations-approval.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Plan of operations-approval. 292.64 Section 292.64 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Locatable Minerals § 292.64 Plan of...

  5. 36 CFR 292.64 - Plan of operations-approval.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Plan of operations-approval. 292.64 Section 292.64 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Locatable Minerals § 292.64 Plan of...

  6. 36 CFR 292.64 - Plan of operations-approval.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Plan of operations-approval. 292.64 Section 292.64 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Locatable Minerals § 292.64 Plan of...

  7. 36 CFR 292.64 - Plan of operations-approval.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Plan of operations-approval. 292.64 Section 292.64 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Locatable Minerals § 292.64 Plan of...

  8. 36 CFR 228.5 - Plan of operations-approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Plan of operations-approval. 228.5 Section 228.5 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE... plans, the Forest Service will arrange for consultation with appropriate agencies of the Department of...

  9. Apparatus for maintaining aligment of a shrinking weld joint in an electron-beam welding operation

    DOEpatents

    Trent, J.B.; Murphy, J.L.

    1980-01-03

    The invention is directed to an apparatus for automatically maintaining a shrinking weld joint in alignement with an electron beam during an electron-beam multipass-welding operation. The apparatus utilizes a bias means for continually urging a workpiece-supporting face plate away from a carriage mounted base that rotatably supports the face plate. The extent of displacement of the face plate away from the base in indicative of the shrinkage occuring in the weld joint area. This displacement is measured and is used to move the base on the carriage a distance equal to one-half the displacement for aligning the weld joint with the electron beam during each welding pass.

  10. [Philanthropic hospitals and the operation of provider-owned health plans in Brazil].

    PubMed

    Lima, Sheyla Maria Lemos; Portela, Margareth C; Ugá, Maria Alicia Dominguez; Barbosa, Pedro Ribeiro; Gerschman, Silvia; Vasconcellos, Miguel Murat

    2007-02-01

    To describe the management performance of philanthropic hospitals that operate their own health plans, in comparison with philanthropic hospitals as a whole in Brazil. The managerial structures of philanthropic hospitals that operated their own health plans were compared with those seen in a representative group from the philanthropic hospital sector, in six dimensions: management and planning, economics and finance, human resources, technical services, logistics services and information technology. Data from a random sample of 69 hospitals within the philanthropic hospital sector and 94 philanthropic hospitals that operate their own health plans were evaluated. In both cases, only the hospitals with less than 599 beds were included. The results identified for the hospitals that operate their own health plans were more positive in all the managerial dimensions compared. In particular, the economics and finance and information technology dimensions were highlighted, for which more than 50% of the hospitals that operated their own health plans presented almost all the conditions considered. The philanthropic hospital sector is important in providing services to the Brazilian Health System (SUS). The challenges in maintaining and developing these hospitals impose the need to find alternatives. Stimulation of a public-private partnership in this segment, by means of operating provider-owned health plans or providing services to other health plans that work together with SUS, is a field that deserves more in-depth analysis.

  11. Interactive orbital proximity operations planning system instruction and training guide

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1994-01-01

    This guide instructs users in the operation of a Proximity Operations Planning System. This system uses an interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station and allows the operator to compose a multi-burn transfer trajectory between orbit initial chaser and target trajectories. The available task time (window) of the mission is predetermined and the maneuver is subject to various operational constraints, such as departure, arrival, spatial, plume impingement, and en route passage constraints. The maneuvers are described in terms of the relative motion experienced in a space station centered coordinate system. Both in-orbital plane as well as out-of-orbital plane maneuvering is considered. A number of visual optimization aids are used for assisting the operator in reaching fuel-efficient solutions. These optimization aids are based on the Primer Vector theory. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool is an example of operator-assisted optimization of nonlinear cost functions.

  12. Joint Test and Evaluation Procedures Manual.

    DTIC Science & Technology

    1980-09-01

    offices within 0oD such as ODDTE may allot funds to individual JTFs for purchasing goods and services. 1-12 Service support to JT&E is usually drawn...on underlying assumptions about the "real world," and that a good operational scenario may conflict with the assumptions for a specific statistical...Learned Since a good Data Management Plan is critical to the success of a joint test, some situations which have occurred in previous tests are listed

  13. SOHO Mission Interruption Joint NASA/ESA Investigation Board

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Contact with the SOlar Heliospheric Observatory (SOHO) spacecraft was lost in the early morning hours of June 25, 1998, Eastern Daylight Time (EDT), during a planned period of calibrations, maneuvers, and spacecraft reconfigurations. Prior to this the SOHO operations team had concluded two years of extremely successful science operations. A joint European Space Agency (ESA)/National Aeronautics and Space Administration (NASA) engineering team has been planning and executing recovery efforts since loss of contact with some success to date. ESA and NASA management established the SOHO Mission Interruption Joint Investigation Board to determine the actual or probable cause(s) of the SOHO spacecraft mishap. The Board has concluded that there were no anomalies on-board the SOHO spacecraft but that a number of ground errors led to the major loss of attitude experienced by the spacecraft. The Board finds that the loss of the SOHO spacecraft was a direct result of operational errors, a failure to adequately monitor spacecraft status, and an erroneous decision which disabled part of the on-board autonomous failure detection. Further, following the occurrence of the emergency situation, the Board finds that insufficient time was taken by the operations team to fully assess the spacecraft status prior to initiating recovery operations. The Board discovered that a number of factors contributed to the circumstances that allowed the direct causes to occur. The Board strongly recommends that the two Agencies proceed immediately with a comprehensive review of SOHO operations addressing issues in the ground procedures, procedure implementation, management structure and process, and ground systems. This review process should be completed and process improvements initiated prior to the resumption of SOHO normal operations.

  14. GIS Methodology for Planning Planetary-Rover Operations

    NASA Technical Reports Server (NTRS)

    Powell, Mark; Norris, Jeffrey; Fox, Jason; Rabe, Kenneth; Shu, I-Hsiang

    2007-01-01

    A document describes a methodology for utilizing image data downlinked from cameras aboard a robotic ground vehicle (rover) on a remote planet for analyzing and planning operations of the vehicle and of any associated spacecraft. Traditionally, the cataloging and presentation of large numbers of downlinked planetary-exploration images have been done by use of two organizational methods: temporal organization and correlation between activity plans and images. In contrast, the present methodology involves spatial indexing of image data by use of the computational discipline of geographic information systems (GIS), which has been maturing in terrestrial applications for decades, but, until now, has not been widely used in support of exploration of remote planets. The use of GIS to catalog data products for analysis is intended to increase efficiency and effectiveness in planning rover operations, just as GIS has proven to be a source of powerful computational tools in such terrestrial endeavors as law enforcement, military strategic planning, surveying, political science, and epidemiology. The use of GIS also satisfies the need for a map-based user interface that is intuitive to rover-activity planners, many of whom are deeply familiar with maps and know how to use them effectively in field geology.

  15. Unassailable Advantage: The British Use of Principles of Joint Operations from 1758-1762

    DTIC Science & Technology

    2017-05-25

    operations are based on the Principles of War developed by Baron Antoine Henri de Jomini. The Art of War (London: Greenhill Books), 1992. 6 JP 3-0, Joint...appointment based on this ability and willingness, rather than seniority.46 Also, the landing boats for the Rochefort operation were unacceptable. The... equipped with rudders and small sails to increase control and speed.47 They had either 16 or 20 oarsmen and could carry about a half a company of

  16. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    NASA Technical Reports Server (NTRS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-01-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less man-power rises.Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. The Automated-Scheduling and Planning Environment (ASPEN)tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the ASE project's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  17. A Revenue Planning Tool for Charter School Operators

    ERIC Educational Resources Information Center

    Keller, Eric; Hayes, Cheryl D.

    2009-01-01

    This revenue planning tool aims to help charter school operators develop a sound revenue base that can meet their school's current and future funding needs. It helps identify and assess potential public (federal, state, and local) and private funding sources. The tool incorporates a four-step revenue planning process which includes: (1)…

  18. An Analysis of Current Operational Contract Support Planning Doctrine

    DTIC Science & Technology

    2015-09-01

    P). This project argues for the balanced development of OCS planning acquisition and non-acquisition focused resources to effectively integrate this...planning guidance developed is appropriate for initial entry operations applicable to various levels of theater maturity. 14. SUBJECT TERMS...balanced development of OCS planning acquisition and non- acquisition focused resources to effectively integrate this function across disciplines. The

  19. Spitzer Mission Operation System Planning for IRAC Warm-Instrument Characterization

    NASA Technical Reports Server (NTRS)

    Hunt, Joseph C., Jr.; Sarrel, Marc A.; Mahoney, William A.

    2010-01-01

    This paper will describe how the Spitzer Mission Operations System planned and executed the characterization phase between Spitzer's cryogenic mission and its warm mission. To the largest extend possible, the execution of this phase was done with existing processing and procedures. The modifications that were made were in response to the differences of the characterization phase compared to normal phases before and after. The primary two categories of difference are: unknown date of execution due to uncertainty of knowledge of the date of helium depletion, and the short cycle time for data analysis and re-planning during execution. In addition, all of the planning and design had to be done in parallel with normal operations, and we had to transition smoothly back to normal operations following the transition. This paper will also describe the re-planning we had to do following an anomaly discovered in the first days after helium depletion.

  20. Airborne Data Link Operational Evaluation Test Plan

    DOT National Transportation Integrated Search

    1993-08-01

    This plan describes an end-to-end study of operational concepts and procedures associated with the introduction of electronic data communications between flight crews and air traffic controllers. Full performance controllers from : terminal facilitie...

  1. 77 FR 24979 - Plan of Operations, Environmental Assessment, Big Thicket National Preserve, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service [7148-NZY] Plan of Operations, Environmental.... ACTION: Notice of Availability of a Plan of Operations and Environmental Assessment for a 30-day public... Energy Company (Cimarex), a Plan of Operations to conduct the Rivers Edge 3-D Seismic Survey within the...

  2. Joint Precision Approach and Landing System Nunn-McCurdy Breach Root Cause Analysis and Portfolio Assessment Metrics for DoD Weapons Systems. Volume 8

    DTIC Science & Technology

    2015-01-01

    system that would help in adverse weather conditions. U.S. operations in Bosnia, which were run from a relatively austere airfield with limited air... operations beginning in 2013 (CVN21, Joint Strike Fighter, Joint Unmanned Combat Air System ). cAccording to multiple FAA ofcial planning documents...Positioning System Next Generation Operational Control System HMS Handheld, Manpack and Small Form Fit HUD Head up Display IAMD Integrated Air and

  3. The Joint Lessons Learned System and Interoperability

    DTIC Science & Technology

    1989-06-02

    Learned: 1988-1989 As mentioned in the introduction to this chaoter, the Organizacion of the JcinC Chiefs cf Staff .OJCS) ueren significant transformatioi...Organization and Functions Manual . Washington, D.C.: HQDA, Office of the Deputy Chief 0f Staff for Operations and Plans, June 1984. ’..S. Army. Concept...U.S. Department of Defense. Joint Universal Lessons Learned System (JULLS) User’s Manual . Orlando, Florida: University of Central Florida, Institute

  4. Apparatus for maintaining alignment of a shrinking weld joint in an electron-beam welding operation

    DOEpatents

    Trent, Jett B.; Murphy, Jimmy L.

    1981-01-01

    The present invention is directed to an apparatus for automatically maintaining a shrinking weld joint in alignment with an electron beam during an electron-beam multipass-welding operation. The apparatus utilizes a biasing device for continually urging a workpiece-supporting face plate away from a carriage mounted base that rotatably supports the face plate. The extent of displacement of the face plate away from the base is indicative of the shrinkage occuring in the weld joint area. This displacement is measured and is used to move the base on the carriage a distance equal to one-half the displacement for aligning the weld joint with the electron beam during each welding pass.

  5. Opportunities for Joint Water–Energy Management: Sensitivity of the 2010 Western U.S. Electricity Grid Operations to Climate Oscillations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voisin, N.; Kintner-Meyer, M.; Wu, D.

    The 2016 SECURE Water Act report’s natural water availability benchmark, combined with the 2010 level of water demand from an integrated assessment model, is used as input to drive a large-scale water management model. The regulated flow at hydropower plants and thermoelectric plants in the Western U.S. electricity grid (WECC) is translated into potential hydropower generation and generation capacity constraints. The impact on reliability (unserved energy, reserve margin) and cost (production cost, carbon emissions) of water constraints on 2010-level WECC power system operations is assessed using an electricity production cost model (PCM). Use of the PCM reveals the changes inmore » generation dispatch that reflect the inter-regional interdependencies in water-constrained generation and the ability to use other generation resources to meet all electricity loads in the WECC. August grid operational benchmarks show a range of sensitivity in production cost (-8 to +11%) and carbon emissions (-7 to 11%). The reference reserve margin threshold of 15% above peak load is maintained in the scenarios analyzed, but in 5 out of 55 years unserved energy is observed when normal operations are maintained. There is 1 chance in 10 that a year will demonstrate unserved energy in August, which defines the system’s historical performance threshold to support impact, vulnerability, and adaptation analysis. For seasonal and longer term planning, i.e., multi-year drought, we demonstrate how the Water Scarcity Grid Impact Factor and climate oscillations (ENSO, PDO) can be used to plan for joint water-electricity management to maintain grid reliability.« less

  6. IBM PC/IX operating system evaluation plan

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros

    1984-01-01

    An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.

  7. Gen. Paul J. Selva > Joint Chiefs of Staff > Article View

    Science.gov Websites

    aircraft systems and executive officer, Deputy Chief of Staff, Plans and Resources, Headquarters Strategic Facebook on Flickr Joint Chiefs Army Chief of Staff Marine Corps Commandant Chief of Naval Operations Air Force Chief of Staff Chief of National Guard Bureau Biographies Directorates Directorates of Management

  8. Terrorist-Insurgent Thinking and Joint Special Operational Planning Doctrine and Procedures

    DTIC Science & Technology

    2010-09-01

    b. Often organized planners, with some military training/experience c. Usually the brains behind operations or targeting and having the most detailed... Storytelling and Terrorism: Towards a Compre- hensive ‘Counter-Narrative Strategy,’ ” Strategic Insights IV:3 (March 2005), 1-16. Center for Army Lessons

  9. Missouri commercial vehicle operations : state business plan

    DOT National Transportation Integrated Search

    1998-05-15

    This business plan is intended to assist this state in improving its commercial vehicle operation regulation, guide the deployment and installation of intelligent transportation systems and to implement these systems in an efficient and cost effectiv...

  10. Method and apparatus for preloading a joint by remotely operable means

    NASA Technical Reports Server (NTRS)

    Kahn, Jon B. (Inventor)

    1993-01-01

    The invention is a method and apparatus for joining structures, an active structure and a passive structure, and imposing a tensile pre-load on the joint by a remotely operable mechanism comprising a heat contractible joining element. The method and apparatus include mounting on the structure, a probe shaft of material which is transformable from an expanded length to a contracted length when heated to a specific temperature range. The shaft is provided with a probe head which is receivable in a receptacle opening formed in the passive structure, when the active structure is moved into engagement therewith by an appropriate manipulator mechanism. A latching system mounted on the structure adjacent to the receptacle opening captures the probe head, when the probe head is inserted a predetermined amount. A heating coil on the shaft is energizable by remote control for heating the shaft to a temperature range which transforms the shaft to its contracted length, whereby a latching shoulder thereof engages latching elements of the latching system and imposes a tensile preload on the structural joint. Provision is also made for manually adjusting the probe head on the shaft to allow for manual detachment of the structures or manual preloading of the structural joint.

  11. Method and apparatus for preloading a joint by remotely operable means

    NASA Technical Reports Server (NTRS)

    Shelton, Robert O. (Inventor)

    1992-01-01

    The invention is a method and apparatus for joining structures, an active structure and a passive structure, and imposing a tensile pre-load on the joint by a remotely operable mechanism comprising a heat contractible joining element. The method and apparatus include mounting on the structure, a probe shaft of material which is transformable from an expanded length to a contracted length when heated to a specific temperature range. The shaft is provided with a probe head which is receivable in a receptacle opening formed in the passive structure, when the active structure is moved into engagement therewith by an appropriate manipulator mechanism. A latching system mounted on the structure adjacent to the receptacle opening captures the probe head, when the probe head is inserted a predetermined amount. A heating coil on the shaft is energizable by remote control for heating the shaft to a temperature range which transforms the shaft to its contracted length, whereby a latching shoulder thereof engages latching elements of the latching system and imposes a tensile preload on the structural joint. Provision is also made for manually adjusting the probe head on the shaft to allow for manual detachment of the structures or manual preloading of the structural joint.

  12. Exact and explicit optimal solutions for trajectory planning and control of single-link flexible-joint manipulators

    NASA Technical Reports Server (NTRS)

    Chen, Guanrong

    1991-01-01

    An optimal trajectory planning problem for a single-link, flexible joint manipulator is studied. A global feedback-linearization is first applied to formulate the nonlinear inequality-constrained optimization problem in a suitable way. Then, an exact and explicit structural formula for the optimal solution of the problem is derived and the solution is shown to be unique. It turns out that the optimal trajectory planning and control can be done off-line, so that the proposed method is applicable to both theoretical analysis and real time tele-robotics control engineering.

  13. The Secret of Future Defeat: The Evolution of US Joint and Army Doctrine 1993-2006 and the Flawed Conception of Stability Operations

    DTIC Science & Technology

    2007-05-24

    The Secret of Future Defeat: the Evolution of US Joint and Army Doctrine 1993-2006 and the Flawed Conception of Stability Operations A...4. TITLE AND SUBTITLE The Secret of Future Defeat: the Evolution of US Joint and 5a. CONTRACT NUMBER Army Doctrine 1993-2006 and the Flawed... The Secret of Future Defeat: the Evolution of US Joint and Army Doctrine 1993-2006 and the Flawed Conception of Stability Operations Approved by

  14. Summary and results of the joint WMD-DAC/Alameda County bioterrorism response plan exercise.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manley, Dawn Kataoka; Lipkin, Joel; West, Todd H.

    2003-11-01

    On June 12,2003, the Alameda County Public Health Department and Sandia National Laboratories/CA jointly conducted an exercise that used a Weapons of Mass Destruction-Decision Analysis Center (WMD-DAC) bioterrorism attack simulation to test the effectiveness of the county's emergency response plan. The exercise was driven by an assumed release (in the vicinity of the Berkeley Marina), and subsequent spread, of a small quantity of aerosolized, weapons-grade anthrax spores. The simulation used several key WMD-DAC capabilities, namely: (1) integration with an atmospheric dispersion model to calculate expected dose levels in the affected areas, (2) a individual-tracking capability for both infected and non-infectedmore » persons as they made decisions, sought treatment, and received prophylaxis drugs, and (3) a user interface that allows exercise participants to affect the scenario evolution and outcome. The analysis of the county's response plan included documenting and reviewing the decisions made by participants during the exercise. Twenty-six local and regional officials representing the health care system, emergency medical services and law enforcement were involved in responding to the simulated attack. The results of this joint effort include lessons learned both by the Alameda County officials regarding implementation of their bioterrorism response plan and by the Sandia representatives about conducting exercises of this type. These observations are reviewed in this report, and they form a basis for providing a better understanding of group/individual decision processes and for identifying effective communication options among decision makers.« less

  15. Designing and validating the joint battlespace infosphere

    NASA Astrophysics Data System (ADS)

    Peterson, Gregory D.; Alexander, W. Perry; Birdwell, J. Douglas

    2001-08-01

    Fielding and managing the dynamic, complex information systems infrastructure necessary for defense operations presents significant opportunities for revolutionary improvements in capabilities. An example of this technology trend is the creation and validation of the Joint Battlespace Infosphere (JBI) being developed by the Air Force Research Lab. The JBI is a system of systems that integrates, aggregates, and distributes information to users at all echelons, from the command center to the battlefield. The JBI is a key enabler of meeting the Air Force's Joint Vision 2010 core competencies such as Information Superiority, by providing increased situational awareness, planning capabilities, and dynamic execution. At the same time, creating this new operational environment introduces significant risk due to an increased dependency on computational and communications infrastructure combined with more sophisticated and frequent threats. Hence, the challenge facing the nation is the most effective means to exploit new computational and communications technologies while mitigating the impact of attacks, faults, and unanticipated usage patterns.

  16. The United States national volcanic ash operations plan for aviation

    USGS Publications Warehouse

    Albersheim, Steven; Guffanti, Marianne

    2009-01-01

    Volcanic-ash clouds are a known hazard to aviation, requiring that aircraft be warned away from ash-contaminated airspace. The exposure of aviation to potential hazards from volcanoes in the United States is significant. In support of existing interagency operations to detect and track volcanic-ash clouds, the United States has prepared a National Volcanic Ash Operations Plan for Aviation to strengthen the warning process in its airspace. The US National Plan documents the responsibilities, communication protocols, and prescribed hazard messages of the Federal Aviation Administration, National Oceanic and Atmospheric Administration, US Geological Survey, and Air Force Weather Agency. The plan introduces a new message format, a Volcano Observatory Notice for Aviation, to provide clear, concise information about volcanic activity, including precursory unrest, to air-traffic controllers (for use in Notices to Airmen) and other aviation users. The plan is online at http://www.ofcm.gov/p35-nvaopa/pdf/FCM-P35-2007-NVAOPA.pdf. While the plan provides general operational practices, it remains the responsibility of the federal agencies involved to implement the described procedures through orders, directives, etc. Since the plan mirrors global guidelines of the International Civil Aviation Organization, it also provides an example that could be adapted by other countries.

  17. Operations research for resource planning and -use in radiotherapy: a literature review.

    PubMed

    Vieira, Bruno; Hans, Erwin W; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim

    2016-11-25

    The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of advanced analytical models for improved decision making. This paper presents the state of the art in the application of OR methods for logistics optimization in RT, at various managerial levels. A literature search was performed in six databases covering several disciplines, from the medical to the technical field. Papers included in the review were published in peer-reviewed journals from 2000 to 2015. Data extraction includes the subject of research, the OR methods used in the study, the extent of implementation according to a six-stage model and the (potential) impact of the results in practice. From the 33 papers included in the review, 18 addressed problems related to patient scheduling (of which 12 focus on scheduling patients on linear accelerators), 8 focus on strategic decision making, 5 on resource capacity planning, and 2 on patient prioritization. Although calculating promising results, none of the papers reported a full implementation of the model with at least a thorough pre-post performance evaluation, indicating that, apart from possible reporting bias, implementation rates of OR models in RT are probably low. The literature on OR applications in RT covers a wide range of approaches from strategic capacity management to operational scheduling levels, and shows that considerable benefits in terms of both waiting times and resource utilization are likely to be achieved. Various fields can be further developed, for instance optimizing the coordination between the available

  18. Orbital Express mission operations planning and resource management using ASPEN

    NASA Astrophysics Data System (ADS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  19. Joining up health and planning: how Joint Strategic Needs Assessment (JSNA) can inform health and wellbeing strategies and spatial planning.

    PubMed

    Tomlinson, Paul; Hewitt, Stephen; Blackshaw, Neil

    2013-09-01

    There has been a welcome joining up of the rhetoric around health, the environment and land use or spatial planning in both the English public health white paper and the National Planning Policy Framework. However, this paper highlights a real concern that this is not being followed through into practical guidance needed by local authorities (LAs), health bodies and developers about how to deliver this at the local level. The role of Joint Strategic Needs Assessments (JSNAs) and Health and Wellbeing Strategies (HWSs) have the potential to provide a strong basis for integrated local policies for health improvement, to address the wider determinants of health and to reduce inequities. However, the draft JSNA guidance from the Department of Health falls short of providing a robust, comprehensive and practical guide to meeting these very significant challenges. The paper identifies some examples of good practice. It recommends that action should be taken to raise the standards of all JSNAs to meet the new challenges and that HWSs should be aligned spatially and temporally with local plans and other LA strategies. HWSs should also identify spatially targeted interventions that can be delivered through spatial planning or transport planning. Steps need to be taken to ensure that district councils are brought into the process.

  20. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Don

    2014-04-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will havemore » passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.« less

  1. Spacelab shaping space operations planning

    NASA Technical Reports Server (NTRS)

    Steven, F. R.; Reinhold, C.

    1976-01-01

    An up-to-date picture is presented of the organizational structure, the key management personnel, and management relationships of the Spacelab program. Attention is also given to Spacelab's development status and plans for its operations. A number of charts are provided to illustrate the organizational relations. It is pointed out that the parties involved in Spacelab activities must yet resolve questions about ownership of transportation-system elements, payloads, ground support facilities, and data obtained from space missions.

  2. Joint Intelligence Operations Center (JIOC) Baseline Business Process Model & Capabilities Evaluation Methodology

    DTIC Science & Technology

    2012-03-01

    Targeting Review Board OPLAN Operations Plan OPORD Operations Order OPSIT Operational Situation OSINT Open Source Intelligence OV...Analysis Evaluate FLTREPs MISREPs Unit Assign Assets Feedback Asset Shortfalls Multi-Int Collection Political & Embasy Law Enforcement HUMINT OSINT ...Embassy Information OSINT Manage Theater HUMINT Law Enforcement Collection Sort Requests Platform Information Agency Information M-I Collect

  3. 3D Boolean operations in virtual surgical planning.

    PubMed

    Charton, Jerome; Laurentjoye, Mathieu; Kim, Youngjun

    2017-10-01

    Boolean operations in computer-aided design or computer graphics are a set of operations (e.g. intersection, union, subtraction) between two objects (e.g. a patient model and an implant model) that are important in performing accurate and reproducible virtual surgical planning. This requires accurate and robust techniques that can handle various types of data, such as a surface extracted from volumetric data, synthetic models, and 3D scan data. This article compares the performance of the proposed method (Boolean operations by a robust, exact, and simple method between two colliding shells (BORES)) and an existing method based on the Visualization Toolkit (VTK). In all tests presented in this article, BORES could handle complex configurations as well as report impossible configurations of the input. In contrast, the VTK implementations were unstable, do not deal with singular edges and coplanar collisions, and have created several defects. The proposed method of Boolean operations, BORES, is efficient and appropriate for virtual surgical planning. Moreover, it is simple and easy to implement. In future work, we will extend the proposed method to handle non-colliding components.

  4. Electric Motors Maintenance Planning From Its Operating Variables

    NASA Astrophysics Data System (ADS)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  5. Organizing for low cost space operations - Status and plans

    NASA Technical Reports Server (NTRS)

    Lee, C.

    1976-01-01

    Design features of the Space Transportation System (vehicle reuse, low cost expendable components, simple payload interfaces, standard support systems) must be matched by economical operational methods to achieve low operating and payload costs. Users will be responsible for their own payloads and will be charged according to the services they require. Efficient use of manpower, simple documentation, simplified test, checkout, and flight planning are firm goals, together with flexibility for quick response to varying user needs. Status of the Shuttle hardware, plans for establishing low cost procedures, and the policy for user charges are discussed.

  6. Modular space station, phase B extension. Program operations plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  7. AIRSAR South American deployment: Operation plan, version 3.0

    NASA Technical Reports Server (NTRS)

    Kobrick, M.

    1993-01-01

    The United States National Aeronautics and Space Administration (NASA) and the Brazilian Commission for Space Activities (COBAE) are undertaking a joint experiment involving NASA's DC-8 research aircraft and the Airborne Synthetic Aperture Radar (AIRSAR) system during late May and June 1993. The research areas motivating these activities are: (1) fundamental research in the role of soils, vegetation, and hydrology in the global carbon cycle; and (2) in cooperation with South American scientists, airborne remote sensing research for the upcoming NASA Spaceborne Imaging Radar (SIR)-C/X-SAR flights on the Space Shuttle. A flight schedule and plans for the deployment that were developed are included. Maps of the site locations and schematic indications of flight routes and dates, plots showing swath locations derived from the flight requests and generated by flight planning software, and, most importantly, a calendar showing which sites will be imaged each day are included.

  8. 40 CFR 63.1347 - Operation and maintenance plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a...

  9. 40 CFR 63.1347 - Operation and maintenance plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a) You must...

  10. 40 CFR 63.1347 - Operation and maintenance plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a) You must...

  11. 40 CFR 63.1347 - Operation and maintenance plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a...

  12. A complexity science-based framework for global joint operations analysis to support force projection: LDRD Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawton, Craig R.

    2015-01-01

    The military is undergoing a significant transformation as it modernizes for the information age and adapts to address an emerging asymmetric threat beyond traditional cold war era adversaries. Techniques such as traditional large-scale, joint services war gaming analysis are no longer adequate to support program evaluation activities and mission planning analysis at the enterprise level because the operating environment is evolving too quickly. New analytical capabilities are necessary to address modernization of the Department of Defense (DoD) enterprise. This presents significant opportunity to Sandia in supporting the nation at this transformational enterprise scale. Although Sandia has significant experience with engineeringmore » system of systems (SoS) and Complex Adaptive System of Systems (CASoS), significant fundamental research is required to develop modeling, simulation and analysis capabilities at the enterprise scale. This report documents an enterprise modeling framework which will enable senior level decision makers to better understand their enterprise and required future investments.« less

  13. 77 FR 38088 - Development of the Joint Strategic Plan on Intellectual Property Enforcement; Request of the U.S...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... OFFICE OF MANAGEMENT AND BUDGET Development of the Joint Strategic Plan on Intellectual Property Enforcement; Request of the U.S. Intellectual Property Enforcement Coordinator for Public Comments AGENCY: Office of the U.S. Intellectual Property Enforcement Coordinator, Executive Office of the President...

  14. A Guide to Food Service Operation Planning with Information on Preparing and Submitting Plans and Specifications.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Health, Columbus.

    Guidelines are presented for planning a food service operation which is defined as any place kept or maintained for the purpose of preparing or serving meals or lunches for a consideration. Brief discussions are presented pertaining to the value of planning and the preparation and use of plans and specifications. Recommendations and specifications…

  15. Planning, Management, and Economics of Airport Operation

    NASA Technical Reports Server (NTRS)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  16. Kinematic path planning for space-based robotics

    NASA Astrophysics Data System (ADS)

    Seereeram, Sanjeev; Wen, John T.

    1998-01-01

    Future space robotics tasks require manipulators of significant dexterity, achievable through kinematic redundancy and modular reconfigurability, but with a corresponding complexity of motion planning. Existing research aims for full autonomy and completeness, at the expense of efficiency, generality or even user friendliness. Commercial simulators require user-taught joint paths-a significant burden for assembly tasks subject to collision avoidance, kinematic and dynamic constraints. Our research has developed a Kinematic Path Planning (KPP) algorithm which bridges the gap between research and industry to produce a powerful and useful product. KPP consists of three key components: path-space iterative search, probabilistic refinement, and an operator guidance interface. The KPP algorithm has been successfully applied to the SSRMS for PMA relocation and dual-arm truss assembly tasks. Other KPP capabilities include Cartesian path following, hybrid Cartesian endpoint/intermediate via-point planning, redundancy resolution and path optimization. KPP incorporates supervisory (operator) input at any detail to influence the solution, yielding desirable/predictable paths for multi-jointed arms, avoiding obstacles and obeying manipulator limits. This software will eventually form a marketable robotic planner suitable for commercialization in conjunction with existing robotic CAD/CAM packages.

  17. Metering Plan: Intelligent Operational Strategies Through Enhanced Metering Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pope, Jason E.

    The Sustainability Program at Pacific Northwest National Laboratory (PNNL) has adopted a “triple-bottom-line” approach of environmental stewardship, social responsibility, and economic prosperity to its operations. Metering at PNNL works in support of all three, specifically to measure and inform building energy use and greenhouse gas emissions and minimize water use. The foundation for metering at PNNL is a core goal set, which consists of four objectives: providing accurate data without interruption, analyzing data while it is still new, providing actionable recommendations to operations management, and ensuring PNNL’s compliance with contract metering requirements. These core objectives guide the decisions that wemore » make during annual planning and as we operate throughout the year. This 2016 edition of the Metering Plan conveys the metering practices for and vision of the Sustainability Program. Changes in this plan from the 2015 edition include updated tables and an enhanced discussion on energy tracking systems used at PNNL. This plan also discusses updated benchmarking strategies using PNNL’s graphics and analytics tool, BuildingOS by Lucid Design Group. This plan presents our progress toward the metering goals shared by all federal agencies and highlights our successful completion of metering requirements. Currently, PNNL is fully compliant with the applicable legislative and Executive Order metering requirements. PNNL’s approach to the installation of new meters will be discussed. Perhaps most importantly, this plan details the analysis techniques utilized at PNNL that rely on the endless streams of data newly available as a result of increased meter deployment over the last several years. Previous Metering Plans have documented specific meter connection schemes as PNNL focused on deploying meters in a first step toward managing energy and water use. This plan serves not only to highlight PNNL’s successful completion of agency metering

  18. Developing Joint Information Operations Warriors

    DTIC Science & Technology

    2006-04-13

    the spectrum of conflict more than ever before. Information dominance has always been important, but the speed and methods at which it can be sent... information dominance . The analysis begins with a quick review of joint IO doctrine, Service approaches to IO, and IO personnel management. Next, IO

  19. 40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...

  20. Operative planning of functional sessions for multisatellite observation and communication systems

    NASA Astrophysics Data System (ADS)

    Darnopykh, Valeriy V.; Malyshev, Veniamin V.

    2012-04-01

    An important control aspect of modern satellite observation and communication systems is the control of the functional processes. Functional sessions proceed under conditions of restricted technical ability, large amounts or information to be processed by the on-board equipment, practice inequality of the received information, intentions of system management and operators, interests of customers and other factors. A large number of spacecrafts (SC) in orbital constellation is one of the most important factors affecting the functional process also. Besides that some modern projects of satellite systems are multifunctional that is mixed operations of observation and communication. Therefore the functioning of SC on-board equipment must be accurately co-ordinate. That is why the problem of operative planning the functioning of these systems, while directly affecting the efficiency of the system, is very complex and actual at present. A methodical approach and software package for operative planning of functional processes for satellite observation and communication systems, including multifunctional projects, are considered in the paper. The base scheme of this approach consists of four main stages: stage 1—modeling of SC orbital kinematics and dynamics; stage 2—modeling of system functional processes with all kind of restrictions and criterion function values; stage 3—solving an optimization tasks by numerical applicable algorithms and constructing the optimal (or accuracy) plans; stage 4—repeated plan optimization (different variants) and analyzing. Such scheme is the result of authors practical research which have been realized during last 15 years by the operative planning as for any kinds of single SC as for satellite systems with different structure of orbital constellation. The research helps to unify the procedure of operative planning, to formulate basic principles and approaches for its solving, to develop special software package. The main aspects

  1. Marine Special Operations Helicopter Unit: Viability in the Joint Force of 2020

    DTIC Science & Technology

    2012-04-18

    competitive globalized environment will increase the requirements for aviation support. With a dedicated Marine Special Operations Helicopter Squadron...efficiency in planning, training, and execution will provide for precise timely and accurate organic fires, direct mobility support, and reduce the...Fulfilling the gap in Marine Special Operations Command with a dedicated Marine special operations helicopter unit is necessary. Concisely, this will

  2. SouthWest Elevation, Plan Showing Deck Framing, Deck Plan, Plan of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    South-West Elevation, Plan Showing Deck Framing, Deck Plan, Plan of Collar Beams, Etc., Typical Framing Details, End Elevations, Elevation of Scarf Top Chord, Joint Details - Perrine's Bridge, Spanning Wallkill River, Rifton, Ulster County, NY

  3. The GMES Sentinel-5 mission for operational atmospheric monitoring: status and developments

    NASA Astrophysics Data System (ADS)

    Sierk, Bernd; Bezy, Jean-Loup; Caron, Jerôme; Meynard, Roland; Veihelmann, Ben; Ingmann, Paul

    2017-11-01

    Sentinel-5 is an atmospheric monitoring mission planned in the frame of the joint EU/ESA initiative Global Monitoring for Environment and Security (GMES). The objective of the mission, planned to be launched in 2020, is the operational monitoring of trace gas concentrations for atmospheric chemistry and climate applications.

  4. Protocol for concomitant temporomandibular joint custom-fitted total joint reconstruction and orthognathic surgery utilizing computer-assisted surgical simulation.

    PubMed

    Movahed, Reza; Teschke, Marcus; Wolford, Larry M

    2013-12-01

    Clinicians who address temporomandibular joint (TMJ) pathology and dentofacial deformities surgically can perform the surgery in 1 stage or 2 separate stages. The 2-stage approach requires the patient to undergo 2 separate operations and anesthesia, significantly prolonging the overall treatment. However, performing concomitant TMJ and orthognathic surgery (CTOS) in these cases requires careful treatment planning and surgical proficiency in the 2 surgical areas. This article presents a new treatment protocol for the application of computer-assisted surgical simulation in CTOS cases requiring reconstruction with patient-fitted total joint prostheses. The traditional and new CTOS protocols are described and compared. The new CTOS protocol helps decrease the preoperative workup time and increase the accuracy of model surgery. Copyright © 2013 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  5. Mission Operations Planning with Preferences: An Empirical Study

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Khatib, Lina; McGann, Conor

    2006-01-01

    This paper presents an empirical study of some nonexhaustive approaches to optimizing preferences within the context of constraint-based, mixed-initiative planning for mission operations. This work is motivated by the experience of deploying and operating the MAPGEN (Mixed-initiative Activity Plan GENerator) system for the Mars Exploration Rover Mission. Responsiveness to the user is one of the important requirements for MAPGEN, hence, the additional computation time needed to optimize preferences must be kept within reasonabble bounds. This was the primary motivation for studying non-exhaustive optimization approaches. The specific goals of rhe empirical study are to assess the impact on solution quality of two greedy heuristics used in MAPGEN and to assess the improvement gained by applying a linear programming optimization technique to the final solution.

  6. Innovations for ISS Plug-In Plan (IPiP) Operations

    NASA Technical Reports Server (NTRS)

    Moore, Kevin D.

    2013-01-01

    Limited resources and increasing requirements will continue to influence decisions on ISS. The ISS Plug-In Plan (IPiP) supports power and data for utilization, systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Given the fluid launch schedule, the focus of the Plug-In Plan has evolved to anticipate future requirements by judicious development and delivery of power supplies, power strips, Alternating Current (AC) power inverters, along with innovative deployment strategies. A partnership of ISS Program Office, Engineering Directorate, Mission Operations, and International Partners poses unique solutions with existing on-board equipment and resources.

  7. Joint High Speed Vessel (JHSV) Follow on Operational Test and Evaluation (FOT and E) Report

    DTIC Science & Technology

    2015-09-21

    Speed Vessel (JHSV) ship class. The events covered in this testing were not performed during the Initial Operational Test and Evaluation ( IOT &E...support boats since launch of these type boats was completed in IOT &E. 1 “Initial Operational Test...and Evaluation ( IOT &E) with Live Fire Test and Evaluation (LFT&E) on Joint High Speed Vessel (JHSV),” DOT&E, July 17, 2014. 2 MLP (CCS) is a heavy

  8. Operational Plan for Underground Storage Tank 322 R2U2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, D.

    2017-06-07

    This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.

  9. Systemic Operational Design: An Alternative to Estimate Planning

    DTIC Science & Technology

    2009-05-04

    relationships found in the COE. Framing and campaign design, with emphasis on systems theory , have therefore made their way to the forefront of doctrinal...short explanation of the systems theory behind SOD, examines how the SOD process happens, and compares SOD with the time proven “Commander’s Estimate... Theory , Campaign planning, Contemporary Operating Environment, Commander’s Estimate Process, Operational design 16. SECURITY CLASSIFICATION OF

  10. 77 FR 37283 - General Provisions; Operating and Strategic Business Planning; Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... directors of each Farm Credit System institution to adopt an operational and strategic business plan to... FARM CREDIT ADMINISTRATION 12 CFR Part 618 RIN 3052-AC66 General Provisions; Operating and Strategic Business Planning; Effective Date AGENCY: Farm Credit Administration. ACTION: Notice of effective...

  11. 50 CFR 37.24 - Plan of operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Plan of operation. 37.24 Section 37.24 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM GEOLOGICAL AND GEOPHYSICAL EXPLORATION OF THE COASTAL PLAIN, ARCTIC...

  12. 50 CFR 37.24 - Plan of operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 8 2011-10-01 2011-10-01 false Plan of operation. 37.24 Section 37.24 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM GEOLOGICAL AND GEOPHYSICAL EXPLORATION OF THE COASTAL PLAIN, ARCTIC...

  13. Galileo mission planning for Low Gain Antenna based operations

    NASA Technical Reports Server (NTRS)

    Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.

    1994-01-01

    The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include

  14. Galileo mission planning for Low Gain Antenna based operations

    NASA Astrophysics Data System (ADS)

    Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.

    1994-11-01

    The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include

  15. Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Tran, Daniel; Rabideau, Gregg; Schaffer, Steve; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

  16. Oceanic gamefish/Skylab project field operating plan for operations 4, 5 August. [in Gulf of Mexico

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The operation plans are presented for the oceanic Gamefish/Skylab Experiment 240, which was conducted to obtain fish catch data for the northeast area of the Gulf of Mexico. The plans for surface measurements, aerial observations, and communications are included.

  17. Stereoelectroencephalography based on the Leksell stereotactic frame and Neurotech operation planning software.

    PubMed

    Zhang, Guangming; Chen, Guoqiang; Meng, Dawei; Liu, Yanwu; Chen, Jianwei; Shu, Lanmei; Liu, Wenbo

    2017-06-01

    This study aimed to introduce a new stereoelectroencephalography (SEEG) system based on Leksell stereotactic frame (L-SEEG) as well as Neurotech operation planning software, and to investigate its safety, applicability, and reliability.L-SEEG, without the help of navigation, includes SEEG operation planning software (Neurotech), Leksell stereotactic frame, and corresponding surgical instruments. Neurotech operation planning software can be used to display three-dimensional images of the cortex and cortical vessels and to plan the intracranial electrode implantation. In 44 refractory epilepsy patients, 364 intracranial electrodes were implanted through the L-SEEG system, and the postoperative complications such as bleeding, cerebral spinal fluid (CSF) leakage, infection, and electrode-related problems were also investigated.All electrodes were implanted accurately as preoperatively planned shown by postoperative lamina computed tomography and preoperative lamina magnetic resonance imaging. There was no severe complication after intracranial electrode implantation through the L-SEEG system. There were no electrode-related problems, no CSF leakage and no infection after surgery. All the patients recovered favorably after SEEG electrode implantation, and only 1 patient had asymptomatic frontal lateral ventricle hematoma (3 mL).The L-SEEG system with Neurotech operation planning software can be used for safe, accurate, and reliable intracranial electrode implantation for SEEG.

  18. Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

    NASA Technical Reports Server (NTRS)

    Fox, Jason M.; Norris, Jeffrey S.; Powell, Mark W.; Rabe, Kenneth J.; Shams, Khawaja

    2006-01-01

    A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

  19. National Transonic Facility: A review of the operational plan

    NASA Technical Reports Server (NTRS)

    Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.

    1980-01-01

    The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.

  20. Iterative Repair Planning for Spacecraft Operations Using the Aspen System

    NASA Technical Reports Server (NTRS)

    Rabideau, G.; Knight, R.; Chien, S.; Fukunaga, A.; Govindjee, A.

    2000-01-01

    This paper describes the Automated Scheduling and Planning Environment (ASPEN). ASPEN encodes complex spacecraft knowledge of operability constraints, flight rules, spacecraft hardware, science experiments and operations procedures to allow for automated generation of low level spacecraft sequences. Using a technique called iterative repair, ASPEN classifies constraint violations (i.e., conflicts) and attempts to repair each by performing a planning or scheduling operation. It must reason about which conflict to resolve first and what repair method to try for the given conflict. ASPEN is currently being utilized in the development of automated planner/scheduler systems for several spacecraft, including the UFO-1 naval communications satellite and the Citizen Explorer (CX1) satellite, as well as for planetary rover operations and antenna ground systems automation. This paper focuses on the algorithm and search strategies employed by ASPEN to resolve spacecraft operations constraints, as well as the data structures for representing these constraints.

  1. [Operative treatment and curative effects of the deltoid ligament injuries of the ankle joint].

    PubMed

    Cong, Pei-Jun; Liu, Bai-Hong; Wang, Ji-Ping; Qiao, Yong-Ping

    2009-12-01

    To explore the operative methods and curative effects of the deltoid ligament injuries. From 2002 to 2008, all 61 patients with ankle fractures complicated with deltoid ligament injuries were treated with open reduction and firm internal fixation. Among the patients, 39 patients were male and 22 patients were female, ranging in age from 14 to 71 years, with an average of 41 years. During the operation, the deltoid ligament was reconstructed to restore the medial and lateral stability of ankle joint. All the patients were followed up ranged from 5 to 30 months, with an average of 17 months. Fifty-nine patients had incision healed at the first stage; 2 patients had superficial infections at lateral malleolus, and healed at the 3rd week after changing dressings. The incisions at the internal medial malleolus were all healed at the first stage. According to Qi evaluation criteria, 35 patients got an excellent result, 13 good and 13 fair. The deltoid ligament should be treated properly in the treatment of ankle joint fractures when open reduction and firm internal fixation were emphasized.

  2. Joint Spacelab-J (SL-J) Activities at the Huntsville Operations Support Center (HOSC) Spacelab

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The science laboratory, Spacelab-J (SL-J), flown aboard the STS-47 flight was a joint venture between NASA and the National Space Development Agency of Japan (NASDA) utilizing a manned Spacelab module. The mission conducted 24 materials science and 20 life science experiments, of which 35 were sponsored by NASDA, 7 by NASA, and two collaborative efforts. Materials science investigations covered such fields as biotechnology, electronic materials, fluid dynamics and transport phenomena, glasses and ceramics, metals and alloys, and acceleration measurements. Life sciences included experiments on human health, cell separation and biology, developmental biology, animal and human physiology and behavior, space radiation, and biological rhythms. Test subjects included the crew, Japanese koi fish (carp), cultured animal and plant cells, chicken embryos, fruit flies, fungi and plant seeds, and frogs and frog eggs. Featured together in joint ground activities during the SL-J mission are NASA/NASDA personnel at the Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at Marshall Space Flight Center (MSFC).

  3. Remotely Operated Aircraft (ROA) Impact on the National Airspace System (NAS) Work Package, 2005: Composite Report on FAA Flight Plan and Operational Evaluation Plan. Version 7.0

    NASA Technical Reports Server (NTRS)

    2005-01-01

    The purpose of this document is to present the findings that resulted from a high-level analysis and evaluation of the following documents: (1) The OEP (Operational Evolution Plan) Version 7 -- a 10-year plan for operational improvements to increase capacity and efficiency in U.S. air travel and transport and other use of domestic airspace. The OEP is the FAA commitment to operational improvements. It is outcome driven, with clear lines of accountability within FAA organizations. The OEP concentrates on operational solutions and integrates safety, certification, procedures, staffing, equipment, avionics and research; (2) The Draft Flight Plan 2006 through 2010 -- a multi-year strategic effort, setting a course for the FAA through 2001, to provide the safest and most efficient air transportation system in the world; (3) The NAS System Architecture Version 5 -- a blueprint for modernizing the NAS and improving NAS services and capabilities through the year 2015; and (4) The NAS-SR-1000 System Requirements Specification (NASSRS) -- a compilation of requirements which describe the operational capabilities for the NAS. The analysis is particularly focused on examining the documents for relevance to existing and/or planned future UAV operations. The evaluation specifically focuses on potential factors that could materially affect the development of a commercial ROA industry, such as: (1) Design limitations of the CNS/ATM system, (2) Human limitations, The information presented was taken from program specifications or program office lead personnel.

  4. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  5. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  6. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  7. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  8. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  9. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  10. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  11. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  12. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  13. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  14. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  15. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  16. Temporo mandibular joint ankylosis.

    PubMed

    Vasconcelos, Belmiro Cavalcanti do Egito; Porto, Gabriela Granja; Bessa-Nogueira, Ricardo Viana

    2008-01-01

    Ankylosis may be defined as joint surfaces fusion. The treatment of temporomandibular joint ankylosis poses a significant challenge because of the high recurrence rate. The aim of this study is to report six cases treated by joint reconstruction, evaluate the results of these surgeries and review the literature. The sample in this retrospective study was obtained from the records of the university hospital, patients who had to undergo ankylosis treatment by alloplastic or autogenous graft between March 2001 and October 2005. Pre - and post-operative assessment included a throughout history and physical examination to determine the cause of ankylosis, the Maximum mouth opening (MMO), etiology and type of ankylosis, recurrence rate and presence of facial nerve paralysis. The mean MMO in the pre-operative period was 9.6 mm (0 mm to 17 mm) and in the post-operative period it was of 31.33 mm (14 mm to 41 mm), there was no facial nerve paralysis and there was recurrence in just one case. The joint reconstruction with alloplastic or autogenous grafts for the ankylosis treatment proved to be efficient in relation to the post-operative MMO, recurrence and joint function.

  17. Radiological Defense. Planning and Operations Guide. Revised.

    ERIC Educational Resources Information Center

    Office of Civil Defense (DOD), Washington, DC.

    This guide is a reprint of published and draft materials from the Federal Civil Defense Guide. This guide is intended to assist the student in planning, developing, implementing and operating a local, county, or state radiological defense (RADEF) system. The state and local radiological defense program objectives are to create an effective and…

  18. Operational space trajectory tracking control of robot manipulators endowed with a primary controller of synthetic joint velocity.

    PubMed

    Moreno-Valenzuela, Javier; González-Hernández, Luis

    2011-01-01

    In this paper, a new control algorithm for operational space trajectory tracking control of robot arms is introduced. The new algorithm does not require velocity measurement and is based on (1) a primary controller which incorporates an algorithm to obtain synthesized velocity from joint position measurements and (2) a secondary controller which computes the desired joint acceleration and velocity required to achieve operational space motion control. The theory of singularly perturbed systems is crucial for the analysis of the closed-loop system trajectories. In addition, the practical viability of the proposed algorithm is explored through real-time experiments in a two degrees-of-freedom horizontal planar direct-drive arm. Copyright © 2010 ISA. Published by Elsevier Ltd. All rights reserved.

  19. Radiographic failure and rates of re-operation after acromioclavicular joint reconstruction: a comparison of surgical techniques.

    PubMed

    Spencer, H T; Hsu, L; Sodl, J; Arianjam, A; Yian, E H

    2016-04-01

    To compare radiographic failure and re-operation rates of anatomical coracoclavicular (CC) ligament reconstructional techniques with non-anatomical techniques after chronic high grade acromioclavicular (AC) joint injuries. We reviewed chronic AC joint reconstructions within a region-wide healthcare system to identify surgical technique, complications, radiographic failure and re-operations. Procedures fell into four categories: (1) modified Weaver-Dunn, (2) allograft fixed through coracoid and clavicular tunnels, (3) allograft loop coracoclavicular fixation, and (4) combined allograft loop and synthetic cortical button fixation. Among 167 patients (mean age 38.1 years, (standard deviation (sd) 14.7) treated at least a four week interval after injury, 154 had post-operative radiographs available for analysis. Radiographic failure occurred in 33/154 cases (21.4%), with the lowest rate in Technique 4 (2/42 4.8%, p = 0.001). Half the failures occurred by six weeks, and the Kaplan-Meier survivorship at 24 months was 94.4% (95% confidence interval (CI) 79.6 to 98.6) for Technique 4 and 69.9% (95% CI 59.4 to 78.3) for the other techniques when combined. In multivariable survival analysis, Technique 4 had better survival than other techniques (Hazard Ratio 0.162, 95% CI 0.039 to 0.068, p = 0.013). Among 155 patients with a minimum of six months post-operative insurance coverage, re-operation occurred in 9.7% (15 patients). However, in multivariable logistic regression, Technique 4 did not reach a statistically significant lower risk for re-operation (odds ratio 0.254, 95% CI 0.05 to 1.3, p = 0.11). In this retrospective series, anatomical CC ligament reconstruction using combined synthetic cortical button and allograft loop fixation had the lowest rate of radiographic failure. Anatomical coracoclavicular ligament reconstruction using combined synthetic cortical button and allograft loop fixation had the lowest rate of radiographic failure. ©2016 The British Editorial

  20. 28 CFR 48.4 - Application for approval of joint newspaper operating arrangement entered into after July 24, 1970.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... newspaper operating arrangement entered into after July 24, 1970. 48.4 Section 48.4 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) NEWSPAPER PRESERVATION ACT § 48.4 Application for approval of joint newspaper operating arrangement entered into after July 24, 1970. (a) Persons desiring to obtain the...

  1. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  2. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  3. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  4. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  5. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  6. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  7. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  8. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  9. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  10. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  11. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  12. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  13. NEWS RELEASE - Agencies Agree to Joint Regulatory Framework for Processing Applications for Surface Coal Mining Operations

    EPA Pesticide Factsheets

    News release from February 10, 2005 announcing a memorandum of understanding (MOU) that offers a joint framework to improve permit application procedures for surface coal mining operations that place dredged or fill material in waters of the United States.

  14. Special Libraries: Planning and Operation; Preliminary Draft.

    ERIC Educational Resources Information Center

    Weiner, Betty H.

    An attempt is made in this report to combine a pragmatic how-to-do-it approach with suggestions for applying system analysis techniques for planning and operating a small special library or information center. A special library is defined as a library in a commercial, industrial, governmental or non-profit organization such as research…

  15. Command and Control of Joint Air Operations. Some Lessons Learned from Four Case Studies of an Enduring Issue

    DTIC Science & Technology

    1991-01-01

    New Zealand Air Force.4 To further complicate matters, General Douglas MacArthur, as Commander Southwest Pacific Area, and the adjoining theater...Army, Marine, and New Zealand officers and the top job was rotated fairly regularly among the services.10 By early 1943 a truly joint staff had...in joint air operations. 2C. Kenneth Allard, Command, Control, and the Common Defense, Yale University Press, New Haven, 1990. The authors strongly

  16. Swimming Pools. A Guide to Their Planning, Design and Operation.

    ERIC Educational Resources Information Center

    Gabrielsen, M. Alexander, Ed.

    Information is presented regarding all phases of swimming pool development and operation from earliest planning considerations to final programing. This comprehensive book covers--(1) the steps involved in planning a pool, (2) designing the pool, (3) water circulation, filtration, and treatment, (4) community pools, school and agency pools, and…

  17. Ohio Route 50 joint sealant experiment : research implementation plan.

    DOT National Transportation Integrated Search

    2005-05-01

    Research in the state of Wisconsin over the past forty years has found no noticeable difference in : performance between jointed concrete pavement (JCP) constructed with a sealed contraction joint and : JCP constructed with a single, narrow, unsealed...

  18. Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

    NASA Technical Reports Server (NTRS)

    Qureshi, Rizwan Hamid; Hughes, Steven P.

    2014-01-01

    The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

  19. Joint ventures: to pursue or not to pursue?

    PubMed

    Blaszyk, Michael D; Hill-Mischel, Jody

    2007-11-01

    Hospitals should carefully select joint venture partners. The joint venture evaluation process should involve a high-level screen of strategic opportunities. Hospitals should develop a full business plan for the joint venture.

  20. 20 CFR 631.40 - State program operational plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State program operational plan. 631.40 Section 631.40 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS... Federal-State Unemployment Compensation System, the Trade Adjustment Assistance Program, the State...

  1. Blood management and transfusion strategies in 600 patients undergoing total joint arthroplasty: an analysis of pre-operative autologous blood donation.

    PubMed

    Perazzo, Paolo; Viganò, Marco; De Girolamo, Laura; Verde, Francesco; Vinci, Anna; Banfi, Giuseppe; Romagnoli, Sergio

    2013-07-01

    Blood loss during total joint arthroplasty strongly influences the time to recover after surgery and the quality of the recovery. Blood conservation strategies such as pre-operative autologous blood donation and post-operative cell salvage are intended to avoid allogeneic blood transfusions and their associated risks. Although widely investigated, the real effectiveness of these alternative transfusion practices remains controversial. The surgery reports of 600 patients undergoing total joint arthroplasty (312 hip and 288 knee replacements) were retrospectively reviewed to assess transfusion needs and related blood management at our institute. Evaluation parameters included post-operative blood loss, haemoglobin concentration measured at different time points, ASA score, and blood transfusion strategies. Autologous blood donation increased the odds of receiving a red blood cell transfusion. Reinfusion by a cell salvage system of post-operative shed blood was found to limit adverse effects in cases of severe post-operative blood loss. The peri-operative net decrease in haemoglobin concentration was higher in patients who had predeposited autologous blood than in those who had not. The strengths of this study are the high number of cases and the standardised procedures, all operations having been performed by a single orthopaedic surgeon and a single anaesthesiologist. Our data suggest that a pre-operative autologous donation programme may often be useless, if not harmful. Conversely, the use of a cell salvage system may be effective in reducing the impact of blood transfusion on a patient's physiological status. Basal haemoglobin concentration emerged as a useful indicator of transfusion probability in total joint replacement procedures.

  2. An Optimized Trajectory Planning for Welding Robot

    NASA Astrophysics Data System (ADS)

    Chen, Zhilong; Wang, Jun; Li, Shuting; Ren, Jun; Wang, Quan; Cheng, Qunchao; Li, Wentao

    2018-03-01

    In order to improve the welding efficiency and quality, this paper studies the combined planning between welding parameters and space trajectory for welding robot and proposes a trajectory planning method with high real-time performance, strong controllability and small welding error. By adding the virtual joint at the end-effector, the appropriate virtual joint model is established and the welding process parameters are represented by the virtual joint variables. The trajectory planning is carried out in the robot joint space, which makes the control of the welding process parameters more intuitive and convenient. By using the virtual joint model combined with the B-spline curve affine invariant, the welding process parameters are indirectly controlled by controlling the motion curve of the real joint. To solve the optimal time solution as the goal, the welding process parameters and joint space trajectory joint planning are optimized.

  3. Joint chemical defense for the rear battle: main operating bases in NATO's central region. Student report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salmi, M.D.

    In 1984, the Chiefs of Staff of the US Army and the US Air Force signed a Memorandum of Understanding (MOU) outlining a concept for the joint air defense of overseas air bases. With little previous experience in joint rear-area operations, problems were bound to occur, especially in the area of chemical warfare defense (CWD). The Army bases its CWD doctrine on the concept of maneuver while the Air Force bases its doctrine on being tied to air bases with little or no capability to avoid chemical attacks. Each Service developed its doctrine to support its operational concept. This studymore » compared and contrasted the CWD doctrine of the Army and the Air Force. If found a great deal of commonality exists; however, there are also several problems which could lead to death, injury, and degradation of sortie generation capability.« less

  4. Runway Operations Planning: A Two-Stage Heuristic Algorithm

    NASA Technical Reports Server (NTRS)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

  5. Applying analysis tools in planning for operations : case study #1 -- operations strategy impact reference and deployment guidance

    DOT National Transportation Integrated Search

    2009-09-01

    More and more, transportation system operators are seeing the benefits of strengthening links between planning and operations. A critical element in improving transportation decision-making and the effectiveness of transportation systems related to o...

  6. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    NASA Technical Reports Server (NTRS)

    Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)

    2011-01-01

    In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

  7. A scientific operations plan for the NASA space telescope. [ground support systems, project planning

    NASA Technical Reports Server (NTRS)

    West, D. K.; Costa, S. R.

    1975-01-01

    A ground system is described which is compatible with the operational requirements of the space telescope. The goal of the ground system is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of space telescope science, or jeopardizing the safety of the space telescope in orbit. The resulting system is able to accomplish this goal through optimum use of existing and planned resources and institutional facilities. Cost is also reduced and efficiency in operation increased by drawing on existing experience in interfacing guest astronomers with spacecraft as well as mission control experience obtained in the operation of present astronomical spacecraft.

  8. Notional Airspace Operations Demonstration Plan

    NASA Technical Reports Server (NTRS)

    Trongale, Nicholas A.

    2006-01-01

    The airspace operations demonstration (AOD) is intended to show that the Access 5 Step 1 functional requirements can be met. The demonstration will occur in two phases. The initial on-range phase will be carried out in restricted airspace to demonstrate the cooperative collision avoidance (CCA) functional requirements and to provide risk-reduction for the AOD by allowing the test team to rehearse some elements of the demonstration mission. The CCA system to be used in these flights is based on Automatic Dependent Surveillance-Broadcast (ADS-B) which is a commercially-available system by which airplanes constantly broadcast their current position and altitude to other aircraft and ground resources over a dedicated radio datalink. The final phase will occur in the national airspace (NAS) and will be the formal demonstration of the remainder of the proposed functional requirements. The general objectives of the AOD are as follows: (1) Demonstrate that the UAS can aviate in the NAS (2) Demonstrate that the UAS can navigate in the NAS (3) Demonstrate that the UAS can communicate with the NAS (4) Demonstrate that the UAS can perform selected collision avoidance functions in the NAS (5) Demonstrate that the UAS can evaluate and avoid weather conflicts in the NAS (6) Demonstrate that the UAS can provide adequate command and control in the NAS In addition to the stated objectives, there are a number of goals for the flight demonstration. The demo can be accomplished successfully without achieving these goals, but these goals are to be used as a guideline for preparing for the mission. The goals are: (1) Mission duration of at least 24 hours (2) Loiter over heavy traffic to evaluate the data block issue identified during the Access 5 Airspace Operations Simulations (3) Document the contingency management process and lessons learned (4) Document the coordination process for Ground Control Stations (GCS) handoff (5) Document lessons learned regarding the process of flying in

  9. The Secret Air War Over France USAAF Special Operations Units in the French Campaign of 1944

    DTIC Science & Technology

    1992-05-01

    Branch, or SI, and its Special Operations Branch, known as SO. The Secret Intelligence Branch was responsible for collecting foreign intelligence...infiltrating its own intelligence agents into France. The Secret Intelligence Branch staff in London (SI/London) began planning for joint operations

  10. Activities of the US-Japan Safety Monitor Joint Working Group

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richard L. Savercool; Lee C. Cadwallader

    2004-09-01

    This paper documents the activities of the US-Japan exchange in the area of personnel safety at magnetic and laser fusion experiments. A near-miss event with a visiting scientist to the US in 1992 was the impetus for forming the Joint Working Group on Fusion Safety. This exchnge has been under way for over ten years and has provided many safety insights for both US and Japanese facility personnel at national institutes and at universities. The background and activities of the Joint Working Group are described, including the facilities that have been visited for safety walkthroughs, the participants from both countries,more » and the main safety issues examined during visits. Based on these visits, some operational safety ideas to enhance experiment safety are given. The near-term future plans of the Safety Monitor Joint Working group are also discussed.« less

  11. 36 CFR 223.32 - Timber sale operating plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Timber sale operating plan. 223.32 Section 223.32 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...

  12. 36 CFR 223.32 - Timber sale operating plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Timber sale operating plan. 223.32 Section 223.32 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...

  13. 36 CFR 223.32 - Timber sale operating plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Timber sale operating plan. 223.32 Section 223.32 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...

  14. 36 CFR 223.32 - Timber sale operating plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Timber sale operating plan. 223.32 Section 223.32 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...

  15. Joint road safety operations in tunnels and open roads

    NASA Astrophysics Data System (ADS)

    Adesiyun, Adewole; Avenoso, Antonio; Dionelis, Kallistratos; Cela, Liljana; Nicodème, Christophe; Goger, Thierry; Polidori, Carlo

    2017-09-01

    The objective of the ECOROADS project is to overcome the barrier established by the formal interpretation of the two Directives 2008/96/EC and 2004/54/EC, which in practice do not allow the same Road Safety Audits/Inspections to be performed inside tunnels. The projects aims at the establishment of a common enhanced approach to road infrastructure and tunnel safety management by using the concepts and criteria of the Directive 2008/96/CE on road infrastructure safety management and the results of related European Commission (EC) funded projects. ECOROADS has already implemented an analysis of national practices regarding Road Safety Inspections (RSI), two Workshops with the stakeholders, and an exchange of best practices between European tunnel experts and road safety professionals, which led to the definition of common agreed safety procedures. In the second phase of the project, different groups of experts and observers applied the above common procedures by inspecting five European road sections featuring both open roads and tunnels in Belgium, Albania, Germany, Serbia and Former Yugoslav Republic of Macedonia. This paper shows the feedback of the 5 joint safety operations and how they are being used for a set of - recommendations and guidelines for the application of the RSA and RSI concepts within the tunnel safety operations.

  16. Blood management and transfusion strategies in 600 patients undergoing total joint arthroplasty: an analysis of pre-operative autologous blood donation

    PubMed Central

    Perazzo, Paolo; Viganò, Marco; de Girolamo, Laura; Verde, Francesco; Vinci, Anna; Banfi, Giuseppe; Romagnoli, Sergio

    2013-01-01

    Background Blood loss during total joint arthroplasty strongly influences the time to recover after surgery and the quality of the recovery. Blood conservation strategies such as pre-operative autologous blood donation and post-operative cell salvage are intended to avoid allogeneic blood transfusions and their associated risks. Although widely investigated, the real effectiveness of these alternative transfusion practices remains controversial. Materials and methods The surgery reports of 600 patients undergoing total joint arthroplasty (312 hip and 288 knee replacements) were retrospectively reviewed to assess transfusion needs and related blood management at our institute. Evaluation parameters included post-operative blood loss, haemoglobin concentration measured at different time points, ASA score, and blood transfusion strategies. Results Autologous blood donation increased the odds of receiving a red blood cell transfusion. Reinfusion by a cell salvage system of post-operative shed blood was found to limit adverse effects in cases of severe post-operative blood loss. The peri-operative net decrease in haemoglobin concentration was higher in patients who had predeposited autologous blood than in those who had not. Discussion The strengths of this study are the high number of cases and the standardised procedures, all operations having been performed by a single orthopaedic surgeon and a single anaesthesiologist. Our data suggest that a pre-operative autologous donation programme may often be useless, if not harmful. Conversely, the use of a cell salvage system may be effective in reducing the impact of blood transfusion on a patient’s physiological status. Basal haemoglobin concentration emerged as a useful indicator of transfusion probability in total joint replacement procedures. PMID:23736922

  17. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less

  18. Microgrids and distributed generation systems: Control, operation, coordination and planning

    NASA Astrophysics Data System (ADS)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids

  19. Case-Based Planning: An Integrated Theory of Planning, Learning and Memory

    DTIC Science & Technology

    1986-10-01

    rtvoeoo oldo II nocomtmry and Idonltly by block numbor) planning Case-based reasoning learning Artificial Intelligence 20. ABSTRACT (Conllnum...Computational Model of Analogical Prob- lem Solving, Proceedings of the Seventh International Joint Conference on Artificial Intelligence ...Understanding and Generalizing Plans., Proceedings of the Eight Interna- tional Joint Conference on Artificial Intelligence , IJCAI, Karlsrhue, Germany

  20. Supply Operations (DLA-O) Total Quality Management (TQM) Master Plan

    DTIC Science & Technology

    1989-07-01

    This document briefly outlines the DLA Directorate of Supply Operations plan to implement total quality management . It seeks to provide better...service to customers at a lower cost through continuous process improvement and commitment from everyone in the organization. Keywords: TQM (total Quality Management ), Supply operations; Continuous process improvement. (KR)

  1. The joint venture alternative to mergers.

    PubMed

    Enders, R J

    1995-02-01

    However, while a joint venture may be "safe" from antitrust challenge, it is not without some practical difficulties, especially with respect to consolidating services at one location or jointly offering services provided at multiple facilities. These practical concerns include: 1. Who will exercise operational management of the joint venture? 2. How will the joint venture deal with different pricing for services that will be provided at multiple locations? 3. What criteria will be used to decide the location at which consolidated tertiary services will be offered? 4. In what circumstances can the joint venture be unwound, either in its entirety or as to discrete functions? When clinical services have been consolidated at one location, there is an appropriate concern by the other hospital that it will be unable to provide or re-enter the market for those services if the joint venture dissolves. These operational concerns, of course, are not addressed in the Consent Decree. Thus, even if a joint venture relationship survives antitrust scrutiny, the parties must still negotiate and resolve these operational issues in order for the joint venture to be viable.

  2. National Space Transportation and Support Study/technology requirements and plans

    NASA Technical Reports Server (NTRS)

    Walberg, G. D.; Gasperich, F. J., Jr.; Scheyhing, E. R.

    1986-01-01

    This paper presents a generic technology plan which has been developed as part of the National Space Transportation and Support Study. This program, which addresses a wide variety of potentially high payoff technology areas, is structured to promote both enhanced vehicle performance and greatly improved operational efficiency and includes both evolutionary and breakthrough technologies. The plan is presented in terms of disciplinary plan elements, which were developed by joint NASA/USAF disciplinary working groups, and as a set of demonstration projects which serve as focal points for the overall plan and drive the development of the many interrelated disciplinary activities.

  3. Joint Doctrine for Electronic Warfare

    DTIC Science & Technology

    2000-04-07

    Command, Control, Communications, and Computer Systems Directorate (J-6) and the Intelligence Directorate (J-2). The joint restricted frequency list (JRFL...for exercises and operations within the operational area. EW interests in the preparation of the joint restricted frequency list for specific... frequency list (JRFL) for approval by the J-3 (through the information operations [IO] cell or equivalent). Periodically updates and distributes the JRFL

  4. Static analysis of large-scale multibody system using joint coordinates and spatial algebra operator.

    PubMed

    Omar, Mohamed A

    2014-01-01

    Initial transient oscillations inhibited in the dynamic simulations responses of multibody systems can lead to inaccurate results, unrealistic load prediction, or simulation failure. These transients could result from incompatible initial conditions, initial constraints violation, and inadequate kinematic assembly. Performing static equilibrium analysis before the dynamic simulation can eliminate these transients and lead to stable simulation. Most exiting multibody formulations determine the static equilibrium position by minimizing the system potential energy. This paper presents a new general purpose approach for solving the static equilibrium in large-scale articulated multibody. The proposed approach introduces an energy drainage mechanism based on Baumgarte constraint stabilization approach to determine the static equilibrium position. The spatial algebra operator is used to express the kinematic and dynamic equations of the closed-loop multibody system. The proposed multibody system formulation utilizes the joint coordinates and modal elastic coordinates as the system generalized coordinates. The recursive nonlinear equations of motion are formulated using the Cartesian coordinates and the joint coordinates to form an augmented set of differential algebraic equations. Then system connectivity matrix is derived from the system topological relations and used to project the Cartesian quantities into the joint subspace leading to minimum set of differential equations.

  5. Network Operations Support Plan for the Spot 2 mission (revision 1)

    NASA Technical Reports Server (NTRS)

    Werbitzky, Victor

    1989-01-01

    The purpose of this Network Operations Support Plan (NOSP) is to indicate operational procedures and ground equipment configurations for the SPOT 2 mission. The provisions in this document take precedence over procedures or configurations in other documents.

  6. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  7. Planning Bepicolombo MPO Science Operations to study Mercury Interior

    NASA Astrophysics Data System (ADS)

    De La Fuente, Sara; Carasa, Angela; Ortiz, Iñaki; Rodriguez, Pedro; Casale, Mauro; Benkhoff, Johannes; Zender, Joe

    2017-04-01

    BepiColombo is an Interdisciplinary Cornerstone ESA-JAXA Mission to Mercury, with two orbiters, the ESA Mercury Planetary Orbiter (MPO) and the JAXA Mercury Magnetospheric Orbiter (MMO) dedicated to study of the planet and its magnetosphere. The MPO, is a three-axis-stabilized, nadir-pointing spacecraft which will be placed in a polar orbit, providing excellent spatial resolution over the entire planet surface. The MPO's scientific payload comprises 11 instrument packages, including laser altimeter, cameras and the radio science experiment that will be dedicated to the study of Mercury's interior: structure, composition, formation and evolution. The planning of the science operations to be carried out by the Mercury's interior scientific instruments will be done by the SGS located at the European Space Astronomy Centre (ESAC), in conjunction with the scientific instrument teams. The process will always consider the complete nominal mission duration, such that the contribution of the scheduled science operations to the science objectives, the total data volume generated, and the seasonal interdependency, can be tracked. The heart of the science operations planning process is the Observations Catalogue (OC), a web-accessed database to collect and analyse all science operations requests. From the OC, the SGS will first determine all science opportunity windows compatible with the spacecraft operational constraints. Secondly, only those compatible with the resources (power and data volume) and pointing constraints will be chosen, including slew feasibility.

  8. 76 FR 31308 - Intent To Prepare an Environmental Impact Statement for the Combined Operational Plan, Miami-Dade...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... Environmental Impact Statement for the Combined Operational Plan, Miami-Dade County, FL AGENCY: Department of... Operational Plan (COP) is an integrated operational plan for Water Conservation Area 3 (WCA-3), Everglades... water management operations for the completed MWD and C-111SD projects that are consistent with their...

  9. Operation Joint Endeavor in Bosnia: telemedicine systems and case reports.

    PubMed

    Calcagni, D E; Clyburn, C A; Tomkins, G; Gilbert, G R; Cramer, T J; Lea, R K; Ehnes, S G; Zajtchuk, R

    1996-01-01

    For the last several years the U.S. Department of Defense (DoD) has operated a telemedicine test bed at the U.S. Army Medical Research and Material Command's Medical Advanced Technology Management Office. The goal of this test bed is to reengineer the military health service system from the most forward deployed forces to tertiary care teaching medical centers within the United States by exploiting emerging telemedicine technologies. The test bed has conducted numerous proof-of-concept telemedicine demonstrations as part of military exercises and in support of real-world troop deployments. The most ambitious of those demonstrations is Primetime III, an ongoing effort to provide telemedicine and other advanced technology support to medical units supporting Operation Joint Endeavor in Bosnia. Several of the first instances of the clinical use of the Primetime III systems are presented as case reports in this paper. These reports demonstrate capabilities and limitations of telemedicine. The Primetime III system demonstrates the technical ability to provide current telecommunications capabilities to medical units stationed in the remote, austere, difficult-to-serve environment of Bosnia. Telemedicine capabilities cannot be used without adequate training, operations, and sustainment support. Video consultations have eliminated the need for some evacuations. The system has successfully augmented the clinical capability of physicians assigned to these medical units. Fullest clinical utilization of telemedicine technologies requires adjustment of conventional clinical practice patterns.

  10. Investigation on edge joints of Inconel 625 sheets processed with laser welding

    NASA Astrophysics Data System (ADS)

    Caiazzo, F.; Alfieri, V.; Cardaropoli, F.; Sergi, V.

    2017-08-01

    Laser welding of Inconel 625 edge joint beads in square groove configuration was investigated. The use of different weld geometries in new aerospace solutions explains research on edge joints. A structured plan was carried out in order to characterize the process defining the influence of laser power and welding speed and to study possible interactions among the governing factors. As weld pool protection is crucial in order to obtain sound joints when processing superalloys, a special glove box for gas supply was designed to upgrade the welding head. Welded joints were characterized referring to bead profile, microstructure and X-rays. It was found that heat input plays an important role as it affects welding stability, porosity content and bead shape. Results suggest operating with low values of heat input to reduce porosity and guarantee stable bead conformation. Furthermore, a decrease in the grain size has been observed as a consequence of decreasing heat input.

  11. 10 CFR 63.161 - Emergency plan for the geologic repository operations area through permanent closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Emergency plan for the geologic repository operations area... OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Emergency Planning Criteria § 63.161 Emergency plan for the geologic repository operations area through permanent...

  12. LANDSAT-D ground segment operations plan, revision A

    NASA Technical Reports Server (NTRS)

    Evans, B.

    1982-01-01

    The basic concept for the utilization of LANDSAT ground processing resources is described. Only the steady state activities that support normal ground processing are addressed. This ground segment operations plan covers all processing of the multispectral scanner and the processing of thematic mapper through data acquisition and payload correction data generation for the LANDSAT 4 mission. The capabilities embedded in the hardware and software elements are presented from an operations viewpoint. The personnel assignments associated with each functional process and the mechanisms available for controlling the overall data flow are identified.

  13. Integrated propulsion technology demonstrator. Program plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

  14. Planning Matters: Response Operations following the 30 September 2009 Sumatran Earthquake

    NASA Astrophysics Data System (ADS)

    Comfort, L. K.; Cedillos, V.; Rahayu, H.

    2009-12-01

    Response operations following the 9/30/2009 West Sumatra earthquake tested extensive planning that had been done in Indonesia since the 26 December 2004 Sumatran Earthquake and Tsunami. After massive destruction in Aceh Province in 2004, the Indonesian National Government revised its national disaster management plans. A key component was to select six cities in Indonesia exposed to significant risk and make a focused investment of resources, planning activities, and public education to reduce risk of major disasters. Padang City was selected for this national “showcase” for disaster preparedness, planning, and response. The question is whether planning improved governmental performance and coordination in practice. There is substantial evidence that disaster preparedness planning and training initiated over the past four years had a positive effect on Padang in terms of disaster risk reduction. The National Disaster Management Agency (BNPB, 10/28/09) reported the following casualties: Padang City: deaths, 383; severe injuries, 431, minor injuries, 771. Province of West Sumatra: deaths, 1209; severe injuries, 67; minor injuries, 1179. These figures contrasted markedly with the estimated losses following the 2004 Earthquake and Tsunami when no training had been done: Banda Aceh, deaths, 118,000; Aceh Province, dead/missing, 236,169 (ID Health Ministry 2/22/05). The 2004 events were more severe, yet the comparable scale of loss was significantly lower in the 9/30/09 earthquake. Three factors contributed to reducing disaster risk in Padang and West Sumatra. First, annual training exercises for tsunami warning and evacuation had been organized by national agencies since 2004. In 2008, all exercises and training activities were placed under the newly established BNPB. The exercise held in Padang in February, 2009 served as an organizing framework for response operations in the 9/30/09 earthquake. Public officers with key responsibilities for emergency operations

  15. Joint Implications for Contracted Logistics

    DTIC Science & Technology

    2007-03-30

    authority with the host nation country and policy on using UCMJ for contracted personnel. As tailored theater policies are developed and contracting...responsibility, this paper recommends better joint training, leader development and joint enablers for contracting operations. JOINT...U.S. Joint Forces Command (JFCOM) are analyzing Congressional and DOD policy to develop procedures and force structure to support contractor

  16. Mixed-Initiative Planning and Scheduling for Science Missions

    NASA Technical Reports Server (NTRS)

    Myers, Karen L.; Wolverton, Michael J.

    2004-01-01

    The objective of this joint NASA Ames/JPL/SRI project was to develop mixed-initiative planning and scheduling technology that would enable more effective and efficient planning of science missions. The original intent behind the project was to have all three organizations work closely on the overall research and technology development objectives. Shortly after the project began, however, the Ames and JPL project members made a commitment to develop and field an operational mixed-initiative planning and scheduling tool called MAPGEN for the 2003 Mars Exploration Rover (MER) mission [Ai-Chang et al. 2003]. Because of the tremendous amounts of time and effort that went into making that tool a success, the Ames and JPL personnel were mostly unavailable for collaboration on the joint objectives of the original proposal. Until November of 2002, SRI postponed work on the project in the hope that the Ames and JPL personnel would be able to find time for the planned collaborative research. During discussions between Dr. Karen Myers (the SRI institutional PI) and Dr. John Bresina (the project PI) during November of 2002, it was mutually agreed that SRI should work independently to achieve some of the research objectives for the project. In particular, Dr. Bresina identified explanation of plans and planner behavior as a critical area for research, based on feedback from demonstrating an initial prototype of MAPGEN to the operational community. For that reason, our focus from November of 2002 through the end of the project was on designing explanation methods to address this need.

  17. Cost Minimization for Joint Energy Management and Production Scheduling Using Particle Swarm Optimization

    NASA Astrophysics Data System (ADS)

    Shah, Rahul H.

    Production costs account for the largest share of the overall cost of manufacturing facilities. With the U.S. industrial sector becoming more and more competitive, manufacturers are looking for more cost and resource efficient working practices. Operations management and production planning have shown their capability to dramatically reduce manufacturing costs and increase system robustness. When implementing operations related decision making and planning, two fields that have shown to be most effective are maintenance and energy. Unfortunately, the current research that integrates both is limited. Additionally, these studies fail to consider parameter domains and optimization on joint energy and maintenance driven production planning. Accordingly, production planning methodology that considers maintenance and energy is investigated. Two models are presented to achieve well-rounded operating strategy. The first is a joint energy and maintenance production scheduling model. The second is a cost per part model considering maintenance, energy, and production. The proposed methodology will involve a Time-of-Use electricity demand response program, buffer and holding capacity, station reliability, production rate, station rated power, and more. In practice, the scheduling problem can be used to determine a joint energy, maintenance, and production schedule. Meanwhile, the cost per part model can be used to: (1) test the sensitivity of the obtained optimal production schedule and its corresponding savings by varying key production system parameters; and (2) to determine optimal system parameter combinations when using the joint energy, maintenance, and production planning model. Additionally, a factor analysis on the system parameters is conducted and the corresponding performance of the production schedule under variable parameter conditions, is evaluated. Also, parameter optimization guidelines that incorporate maintenance and energy parameter decision making in the

  18. KSC ground operations planning for Space Station

    NASA Technical Reports Server (NTRS)

    Lyon, J. R.; Revesz, W., Jr.

    1993-01-01

    At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

  19. An Efficient Missile Loadout Planning Tool for Operational Planners

    DTIC Science & Technology

    2017-06-01

    defense. Two cases were explored : one in which combat air patrol (CAP) was able to assist against the attack, and one without such assets. Dugan (2007...the Navy Operational Planner (NOP) to help decision makers with maritime operational planning. His work explores our Navy’s capability to accomplish...the elitist strategy of genetic algorithms. This strategy forms each new generation as a mix of the elite, or best, solutions carried over from

  20. Foresight for commanders: a methodology to assist planning for effects-based operations

    NASA Astrophysics Data System (ADS)

    Davis, Paul K.; Kahan, James P.

    2006-05-01

    Looking at the battlespace as a system of systems is a cornerstone of Effects-Based Operations and a key element in the planning of such operations, and in developing the Commander's Predictive Environment. Instead of a physical battleground to be approached with weapons of force, the battlespace is an interrelated super-system of political, military, economic, social, information and infrastructure systems to be approached with diplomatic, informational, military and economic actions. A concept that has proved useful in policy arenas other than defense, such as research and development for information technology, addressing cybercrime, and providing appropriate and cost-effective health care, is foresight. In this paper, we provide an overview of how the foresight approach addresses the inherent uncertainties in planning courses of action, present a set of steps in the conduct of foresight, and then illustrate the application of foresight to a commander's decision problem. We conclude that foresight approach that we describe is consistent with current doctrinal intelligence preparation of the battlespace and operational planning, but represents an advance in that it explicitly addresses the uncertainties in the environment and planning in a way that identifies strategies that are robust over different possible ground truths. It should supplement other planning methods.

  1. Construction Management Module: Contingency Contracting Synergistic Approach Integrating Joint Capabilities for USSOCOM

    DTIC Science & Technology

    2010-01-29

    mr_if`=mlif`v - ix - k^s^i=mlpqdo^ar^qb=p`elli= Acronym Listing AAR After-action Report ACC Acquisition Community Connection ADDIE Analyze...J3 Operations J4 Logistics J5 Plans J6 Communications J8 Programming and Comptroller J&A Justification and Approval JARB Joint...Due to geographical and communication constraints, the sample of informants was limited to 20 current USSOCOM personnel. However, the

  2. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  3. MIPPA: First Broad Changes to Medicare Part D Plan Operations.

    PubMed

    LeMasurier, Jean D; Edgar, Babette

    2009-04-01

    In July 2008, as part of broad Medicare reform, Congress passed the first major legislative changes to Medicare Part D since its enactment in 2003-the Medicare Improvements for Patients and Providers Act. This new legislation has significant implications for how Part D plans can market and enroll Medicare beneficiaries. The new legislation also strengthened beneficiary protections, expanded the low-income subsidy provisions originally included in Part D, and expanded Part D coverage. These changes have significant implications for the operation of Part D plans and can affect those involved in benefit design, including specialty pharmacy coverage. This article discusses the major changes that took effect on January 1, 2009, and have immediate implications for Part D plan sponsors, including Medicare Advantage plans and stand-alone prescription drug plans.

  4. MIPPA: First Broad Changes to Medicare Part D Plan Operations

    PubMed Central

    LeMasurier, Jean D.; Edgar, Babette

    2009-01-01

    In July 2008, as part of broad Medicare reform, Congress passed the first major legislative changes to Medicare Part D since its enactment in 2003—the Medicare Improvements for Patients and Providers Act. This new legislation has significant implications for how Part D plans can market and enroll Medicare beneficiaries. The new legislation also strengthened beneficiary protections, expanded the low-income subsidy provisions originally included in Part D, and expanded Part D coverage. These changes have significant implications for the operation of Part D plans and can affect those involved in benefit design, including specialty pharmacy coverage. This article discusses the major changes that took effect on January 1, 2009, and have immediate implications for Part D plan sponsors, including Medicare Advantage plans and stand-alone prescription drug plans. PMID:25126279

  5. Optimizing the Long-Term Operating Plan of Railway Marshalling Station for Capacity Utilization Analysis

    PubMed Central

    Zhou, Wenliang; Yang, Xia; Deng, Lianbo

    2014-01-01

    Not only is the operating plan the basis of organizing marshalling station's operation, but it is also used to analyze in detail the capacity utilization of each facility in marshalling station. In this paper, a long-term operating plan is optimized mainly for capacity utilization analysis. Firstly, a model is developed to minimize railcars' average staying time with the constraints of minimum time intervals, marshalling track capacity, and so forth. Secondly, an algorithm is designed to solve this model based on genetic algorithm (GA) and simulation method. It divides the plan of whole planning horizon into many subplans, and optimizes them with GA one by one in order to obtain a satisfactory plan with less computing time. Finally, some numeric examples are constructed to analyze (1) the convergence of the algorithm, (2) the effect of some algorithm parameters, and (3) the influence of arrival train flow on the algorithm. PMID:25525614

  6. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Treesearch

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  7. Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Ludowise, Melissa; McCurdy, Michael; Li, Jack

    2010-01-01

    Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

  8. A joint urban planning and public health framework: contributions to health impact assessment.

    PubMed

    Northridge, Mary E; Sclar, Elliott

    2003-01-01

    A joint urban planning and public health perspective is articulated here for use, in health impact assessment. Absent a blueprint for a coherent and supportive structure on which to test our thinking, we are bound to fall flat. Such a perspective is made necessary by the sheer number of people living in cities throughout the world, the need for explicit attention to land use and transportation systems as determinants of population health, and the dearth of useful indicators of the built environment for monitoring progress. If explicit attention is not paid to the overarching goals of equality and democracy, they have little if any chance of being realized in projects, programs, and policies that shape the built environment and therefore the public's health.

  9. The Joint Action on Health Workforce Planning and Forecasting: Results of a European programme to improve health workforce policies.

    PubMed

    Kroezen, Marieke; Van Hoegaerden, Michel; Batenburg, Ronald

    2018-02-01

    Health workforce (HWF) planning and forecasting is faced with a number of challenges, most notably a lack of consistent terminology, a lack of data, limited model-, demand-based- and future-based planning, and limited inter-country collaboration. The Joint Action on Health Workforce Planning and Forecasting (JAHWF, 2013-2016) aimed to move forward on the HWF planning process and support countries in tackling the key challenges facing the HWF and HWF planning. This paper synthesizes and discusses the results of the JAHWF. It is shown that the JAHWF has provided important steps towards improved HWF planning and forecasting across Europe, among others through the creation of a minimum data set for HWF planning and the 'Handbook on Health Workforce Planning Methodologies across EU countries'. At the same time, the context-sensitivity of HWF planning was repeatedly noticeable in the application of the tools through pilot- and feasibility studies. Further investments should be made by all actors involved to support and stimulate countries in their HWF efforts, among others by implementing the tools developed by the JAHWF in diverse national and regional contexts. Simultaneously, investments should be made in evaluation to build a more robust evidence base for HWF planning methods. Copyright © 2017 Elsevier B.V. All rights reserved.

  10. Static Analysis of Large-Scale Multibody System Using Joint Coordinates and Spatial Algebra Operator

    PubMed Central

    Omar, Mohamed A.

    2014-01-01

    Initial transient oscillations inhibited in the dynamic simulations responses of multibody systems can lead to inaccurate results, unrealistic load prediction, or simulation failure. These transients could result from incompatible initial conditions, initial constraints violation, and inadequate kinematic assembly. Performing static equilibrium analysis before the dynamic simulation can eliminate these transients and lead to stable simulation. Most exiting multibody formulations determine the static equilibrium position by minimizing the system potential energy. This paper presents a new general purpose approach for solving the static equilibrium in large-scale articulated multibody. The proposed approach introduces an energy drainage mechanism based on Baumgarte constraint stabilization approach to determine the static equilibrium position. The spatial algebra operator is used to express the kinematic and dynamic equations of the closed-loop multibody system. The proposed multibody system formulation utilizes the joint coordinates and modal elastic coordinates as the system generalized coordinates. The recursive nonlinear equations of motion are formulated using the Cartesian coordinates and the joint coordinates to form an augmented set of differential algebraic equations. Then system connectivity matrix is derived from the system topological relations and used to project the Cartesian quantities into the joint subspace leading to minimum set of differential equations. PMID:25045732

  11. Planning low-carbon electricity systems under uncertainty considering operational flexibility and smart grid technologies.

    PubMed

    Moreno, Rodrigo; Street, Alexandre; Arroyo, José M; Mancarella, Pierluigi

    2017-08-13

    Electricity grid operators and planners need to deal with both the rapidly increasing integration of renewables and an unprecedented level of uncertainty that originates from unknown generation outputs, changing commercial and regulatory frameworks aimed to foster low-carbon technologies, the evolving availability of market information on feasibility and costs of various technologies, etc. In this context, there is a significant risk of locking-in to inefficient investment planning solutions determined by current deterministic engineering practices that neither capture uncertainty nor represent the actual operation of the planned infrastructure under high penetration of renewables. We therefore present an alternative optimization framework to plan electricity grids that deals with uncertain scenarios and represents increased operational details. The presented framework is able to model the effects of an array of flexible, smart grid technologies that can efficiently displace the need for conventional solutions. We then argue, and demonstrate via the proposed framework and an illustrative example, that proper modelling of uncertainty and operational constraints in planning is key to valuing operationally flexible solutions leading to optimal investment in a smart grid context. Finally, we review the most used practices in power system planning under uncertainty, highlight the challenges of incorporating operational aspects and advocate the need for new and computationally effective optimization tools to properly value the benefits of flexible, smart grid solutions in planning. Such tools are essential to accelerate the development of a low-carbon energy system and investment in the most appropriate portfolio of renewable energy sources and complementary enabling smart technologies.This article is part of the themed issue 'Energy management: flexibility, risk and optimization'. © 2017 The Author(s).

  12. New York State intelligent transportation system commercial vehicle operations (CVO) : business plan

    DOT National Transportation Integrated Search

    1998-07-01

    The purpose of this Business Plan is to describe the major Intelligent Transportation System (ITS) initiatives and projects in the area of Commercial Vehicle Operations (CVO) that have recently been or are planned to be undertaken in New York State b...

  13. A comprehensive education plan: the key to a successful Joint Commission on Accreditation of Healthcare Organizations survey.

    PubMed

    Thurber, Raymond; Read, Linda Eklof

    2008-01-01

    This article describes how education specialists from a 359-bed acute care hospital in the Northeast developed and implemented a comprehensive educational plan to prepare all staff members on the Joint Commission on Accreditation of Healthcare Organizations (JCAHO) tracer methodology and upcoming triennial survey. This methodology can be utilized by staff development educators in any setting to not only prepare staff members for a successful JCAHO survey but also to meet or exceed JCAHO standards in one's everyday job.

  14. Foreign Humanitarian Assistance/Disaster Relief Operations Planning

    DTIC Science & Technology

    2006-05-15

    NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Navy Warfare Development Command (NWDC),ATTN: N5,686 Cushing Road (Sims Hall),Newport,RI...Operations Planning 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...02841-1207 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11

  15. 36 CFR 292.63 - Plan of operations-supplementary requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Plan of operations-supplementary requirements. 292.63 Section 292.63 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Locatable Minerals...

  16. 36 CFR 292.63 - Plan of operations-supplementary requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Plan of operations-supplementary requirements. 292.63 Section 292.63 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Locatable Minerals...

  17. 36 CFR 292.63 - Plan of operations-supplementary requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Plan of operations-supplementary requirements. 292.63 Section 292.63 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Locatable Minerals...

  18. 36 CFR 292.63 - Plan of operations-supplementary requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Plan of operations-supplementary requirements. 292.63 Section 292.63 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Locatable Minerals...

  19. 36 CFR 292.63 - Plan of operations-supplementary requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Plan of operations-supplementary requirements. 292.63 Section 292.63 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Locatable Minerals...

  20. Maintenance and operations plan for intelligent transportation systems in Kentucky.

    DOT National Transportation Integrated Search

    2004-06-01

    This report presents a Maintenance and Operations Plan for Intelligent Transportation Systems (ITS) in Kentucky. It was developed using substantial stakeholder input and provides recommendations and specific strategies for supporting and coordinating...

  1. Special Operations Forces and Conventional Forces: Integration, Interoperability, and Interdependence

    DTIC Science & Technology

    2016-12-07

    Phasing Model8 WESBROCK, HARNED, AND PLOUS 88 | FEATURES PRISM 6, no. 3 views on how to design, plan, and execute operat ions and campaigns. The...population-centric” operational environment. SOF views campaign design dif- ferently from the six-phase model in joint doc- trine depicted above.9...U.S. interests. This difference between SOF and CF views of cam- paigning can hamper integration from the start of an operation if components of the

  2. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    NASA Technical Reports Server (NTRS)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  3. 7 CFR 623.13 - Wetlands reserve plan of operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... wetland restoration activities and future management and easement monitoring in connection with the land... 7 Agriculture 6 2010-01-01 2010-01-01 false Wetlands reserve plan of operations. 623.13 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.13...

  4. 7 CFR 623.13 - Wetlands reserve plan of operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... wetland restoration activities and future management and easement monitoring in connection with the land... 7 Agriculture 6 2011-01-01 2011-01-01 false Wetlands reserve plan of operations. 623.13 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.13...

  5. 75 FR 64683 - Liability for Termination of Single-Employer Plans; Treatment of Substantial Cessation of Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... Termination of Single-Employer Plans; Treatment of Substantial Cessation of Operations AGENCY: Pension Benefit... cessations of operations by employers that maintain single-employer plans. DATES: Comments must be submitted... 4062(e), which provides for reporting of and liability for certain substantial cessations of operations...

  6. Impact of Operating Rules on Planning Capacity Expansion of Urban Water Supply Systems

    NASA Astrophysics Data System (ADS)

    de Neufville, R.; Galelli, S.; Tian, X.

    2017-12-01

    This study addresses the impact of operating rules on capacity planning of urban water supply systems. The continuous growth of metropolitan areas represents a major challenge for water utilities, which often rely on industrial water supply (e.g., desalination, reclaimed water) to complement natural resources (e.g., reservoirs). These additional sources increase the reliability of supply, equipping operators with additional means to hedge against droughts. How do their rules for using industrial water supply impact the performance of water supply system? How might it affect long-term plans for capacity expansion? Possibly significantly, as demonstrated by the analysis of the operations and planning of a water supply system inspired by Singapore. Our analysis explores the system dynamics under multiple inflow and management scenarios to understand the extent to which alternative operating rules for the use of industrial water supply affect system performance. Results first show that these operating rules can have significant impact on the variability in system performance (e.g., reliability, energy use) comparable to that of hydro-climatological conditions. Further analyses of several capacity expansion exercises—based on our original hydrological and management scenarios—show that operating rules significantly affect the timing and magnitude of critical decisions, such as the construction of new desalination plants. These results have two implications: Capacity expansion analysis should consider the effect of a priori uncertainty about operating rules; and operators should consider how their flexibility in operating rules can affect their perceived need for capacity.

  7. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    NASA Technical Reports Server (NTRS)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  8. [Osseous and soft tissue operations for treatment of joint malpositioning in infantile cerebral palsy].

    PubMed

    Senst, S

    2013-12-01

    If untreated infantile cerebral palsy (ICP) leads to a progressive shortening of muscles and to progressive joint malpositioning. In addition a number of other disorders also result, in particular sensory disorders, intelligence deficits and epilepsy. In order to optimally treat as many as possible of the problems of multi-handicapped children with ICP it is of immanent importance that physiotherapists, occupational therapists, speech therapists, orthopedic technicians, pediatric orthopedists as well as neuropediatricians and social pediatricians work as a team. Surgical measures to correct joint malpositioning serve to improve the function and also to avoid or alleviate pain. Functional improvement measures are ideally undertaken during or shortly before elementary school age, thus enabling a further verticalization/straightening and mobilization. To improve symmetry and therefore the sitting posture, surgery is also indicated for profoundly disabled patients, sometimes making foot operations necessary. It is only in this way that maximum participation can be guaranteed and if necessary utilizing additional aids, such as Zimmer frames or E-wheelchairs.

  9. Gas Hydrate Research Site Selection and Operational Research Plans

    NASA Astrophysics Data System (ADS)

    Collett, T. S.; Boswell, R. M.

    2009-12-01

    In recent years it has become generally accepted that gas hydrates represent a potential important future energy resource, a significant drilling and production hazard, a potential contributor to global climate change, and a controlling factor in seafloor stability and landslides. Research drilling and coring programs carried out by the Ocean Drilling Program (ODP), the Integrated Ocean Drilling Program (IODP), government agencies, and several consortia have contributed greatly to our understanding of the geologic controls on the occurrence of gas hydrates in marine and permafrost environments. For the most part, each of these field projects were built on the lessons learned from the projects that have gone before them. One of the most important factors contributing to the success of some of the more notable gas hydrate field projects has been the close alignment of project goals with the processes used to select the drill sites and to develop the project’s operational research plans. For example, IODP Expedition 311 used a transect approach to successfully constrain the overall occurrence of gas hydrate within the range of geologic environments within a marine accretionary complex. Earlier gas hydrate research drilling, including IODP Leg 164, were designed primarily to assess the occurrence and nature of marine gas hydrate systems, and relied largely on the presence of anomalous seismic features, including bottom-simulating reflectors and “blanking zones”. While these projects were extremely successful, expeditions today are being increasingly mounted with the primary goal of prospecting for potential gas hydrate production targets, and site selection processes designed to specifically seek out anomalously high-concentrations of gas hydrate are needed. This approach was best demonstrated in a recently completed energy resource focused project, the Gulf of Mexico Gas Hydrate Joint Industry Project Leg II (GOM JIP Leg II), which featured the collection of a

  10. Hazardous-waste analysis plan for LLNL operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, R.S.

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan willmore » address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste.« less

  11. Advancing metropolitan planning for operations : an objectives-driven, performance-based approach : a guidebook

    DOT National Transportation Integrated Search

    2010-02-01

    This guidebook presents an approach for integrating management and operations (M&O) strategies into the metropolitan transportation planning process that is designed to maximize the performance of the existing and planned transportation system. This ...

  12. Roof plan, Combat Operations Center, Building No. 2605. (Also includes ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Roof plan, Combat Operations Center, Building No. 2605. (Also includes a typical roof section, with new fiberglass and urethane insulation layers.) By Federal Builders, 575 Carreon Drive, Colton, California. Sheet 1 of 1, dated 18 May 1992. Scale one-eighth inch to one foot. 24x36 inches. ink on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  13. Using Micro-Synchrophasor Data for Advanced Distribution Grid Planning and Operations Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stewart, Emma; Kiliccote, Sila; McParland, Charles

    2014-07-01

    This report reviews the potential for distribution-grid phase-angle data that will be available from new micro-synchrophasors (µPMUs) to be utilized in existing distribution-grid planning and operations analysis. This data could augment the current diagnostic capabilities of grid analysis software, used in both planning and operations for applications such as fault location, and provide data for more accurate modeling of the distribution system. µPMUs are new distribution-grid sensors that will advance measurement and diagnostic capabilities and provide improved visibility of the distribution grid, enabling analysis of the grid’s increasingly complex loads that include features such as large volumes of distributed generation.more » Large volumes of DG leads to concerns on continued reliable operation of the grid, due to changing power flow characteristics and active generation, with its own protection and control capabilities. Using µPMU data on change in voltage phase angle between two points in conjunction with new and existing distribution-grid planning and operational tools is expected to enable model validation, state estimation, fault location, and renewable resource/load characterization. Our findings include: data measurement is outstripping the processing capabilities of planning and operational tools; not every tool can visualize a voltage phase-angle measurement to the degree of accuracy measured by advanced sensors, and the degree of accuracy in measurement required for the distribution grid is not defined; solving methods cannot handle the high volumes of data generated by modern sensors, so new models and solving methods (such as graph trace analysis) are needed; standardization of sensor-data communications platforms in planning and applications tools would allow integration of different vendors’ sensors and advanced measurement devices. In addition, data from advanced sources such as µPMUs could be used to validate models to improve

  14. Sensitivity of a juvenile subject-specific musculoskeletal model of the ankle joint to the variability of operator-dependent input.

    PubMed

    Hannah, Iain; Montefiori, Erica; Modenese, Luca; Prinold, Joe; Viceconti, Marco; Mazzà, Claudia

    2017-05-01

    Subject-specific musculoskeletal modelling is especially useful in the study of juvenile and pathological subjects. However, such methodologies typically require a human operator to identify key landmarks from medical imaging data and are thus affected by unavoidable variability in the parameters defined and subsequent model predictions. The aim of this study was to thus quantify the inter- and intra-operator repeatability of a subject-specific modelling methodology developed for the analysis of subjects with juvenile idiopathic arthritis. Three operators each created subject-specific musculoskeletal foot and ankle models via palpation of bony landmarks, adjustment of geometrical muscle points and definition of joint coordinate systems. These models were then fused to a generic Arnold lower limb model for each of three modelled patients. The repeatability of each modelling operation was found to be comparable to those previously reported for the modelling of healthy, adult subjects. However, the inter-operator repeatability of muscle point definition was significantly greater than intra-operator repeatability ( p < 0.05) and predicted ankle joint contact forces ranged by up to 24% and 10% of the peak force for the inter- and intra-operator analyses, respectively. Similarly, the maximum inter- and intra-operator variations in muscle force output were 64% and 23% of peak force, respectively. Our results suggest that subject-specific modelling is operator dependent at the foot and ankle, with the definition of muscle geometry the most significant source of output uncertainty. The development of automated procedures to prevent the misplacement of crucial muscle points should therefore be considered a particular priority for those developing subject-specific models.

  15. 75 FR 37883 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... Planning and Cost Allocation by Transmission Owning and Operating Public Utilities; Proposed Rule #0;#0...] Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities Issued June 17... Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting...

  16. 75 FR 35816 - Establishment of the Consumer Operated and Oriented Plan (CO-OP) Advisory Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... (CO-OP) Advisory Board AGENCY: Department of Health and Human Services, Office of Consumer Information & Insurance Oversight. ACTION: Federal Register Notice. Authority: The Consumer Operated and Oriented Plan (CO... (PPACA) that calls for the establishment of the Consumer Operated and Oriented Plans (CO-OP) Program...

  17. State of Montana ITS/CVO business plan : intelligent transportation system commercial vehicle operations

    DOT National Transportation Integrated Search

    1998-01-01

    This plans purpose is to encourage coordinated, efficient and safe commercial vehicle operations throughout Montana, and to promote inter-agency and regional cooperation as ITS/CVO projects are developed and deployed. The Plan discusses Montana...

  18. 14 CFR 136.13 - Helicopter performance plan and operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for the approach to and transition from a hover for the purpose of takeoff and landing, or during... the caution/warning/avoid area of the limiting height/velocity diagram. (c) Except for the approach to... into consideration the maximum density altitude for which the operation is planned, in order to...

  19. 14 CFR 136.13 - Helicopter performance plan and operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for the approach to and transition from a hover for the purpose of takeoff and landing, or during... the caution/warning/avoid area of the limiting height/velocity diagram. (c) Except for the approach to... into consideration the maximum density altitude for which the operation is planned, in order to...

  20. 41. OPERATING CORRIDOR PLAN AND SECTIONS, INCLUDING SOME ISOMETRIC DETAILS. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. OPERATING CORRIDOR PLAN AND SECTIONS, INCLUDING SOME ISOMETRIC DETAILS. INEEL DRAWING NUMBER 200-0633-00-287-106455. FLUOR NUMBER 5775-CPP-633-P-60 - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  1. Applying analysis tools in planning for operations : case study #2 -- incorporating Highway Capacity Manual procedures into long-range transportation planning

    DOT National Transportation Integrated Search

    2009-09-01

    More and more, transportation system operators are seeing the benefi ts of strengthening links between : planning and operations. A critical element in improving transportation decision-making and the effectiveness : of transportation systems related...

  2. Health sector operational planning and budgeting processes in Kenya-"never the twain shall meet".

    PubMed

    Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine

    2016-07-01

    Operational planning is considered an important tool for translating government policies and strategic objectives into day-to-day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top-down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local-level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.

  3. Photographic copy of foundation plans for Administration Building (T50), Operations ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of foundation plans for Administration Building (T-50), Operations Building (T-42), and Inflammable Storage Building (T-57): Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. A(9-10), Military Construction: Materiel Command Flight Test Base, Muroc, California, Hangar and Auxiliary Buildings: Administration Bldg Type OB-H-T, Operations Bldg Type OB-A-T, Inflammable Storage Bldg. Type WHSE 1-A (Mod.) Foundation Plans, Sheet No. 35 of 38, March 1944. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Administration Building T-50, D Street, Boron, Kern County, CA

  4. It's Indisputable: Five Facts About Planning and Operating Modern Power Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bloom, Aaron; Helman, Udi; Holttinen, Hannele

    An indisputable fact cannot be rebutted. It is supported by theory and experience. Over the past 25 years, wind and solar generation has undergone dramatic growth, resulting in a variety of experiences that model the integration of wind and solar into the planning and operation of modern electric power systems. In this article, we bring together examples from Europe, North America, and Australia to identify five indisputable facts about planning and operating modern power systems. Taken together, we hope these experiences can help build consensus among the engineering and public policy communities about the current state of wind and solarmore » integration and also facilitate conversations about evolving future challenges.« less

  5. Joint Urban Operations Joint Integrating Concept

    DTIC Science & Technology

    2007-07-23

    24 7. Potential Risks of Adopting this Concept...stresses that urban combat operations are conducted only when required and that built-up areas are isolated and bypassed rather than risking a...Development, Applications (New York: George Braziller , 1968). 7 media, etc., institutions that typify urban society.15 The processes include all

  6. Capacity evaluation and infrastructure planning techniques for heterogeneous railway traffic under structured, flexible and mixed operations.

    DOT National Transportation Integrated Search

    2017-01-22

    The objective of this study is to develop new railway capacity evaluation tools and infrastructure planning techniques to address infrastructure or operations planning challenges under different operating styles. Three main research questions will be...

  7. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    DTIC Science & Technology

    2013-10-01

    349–372 Phase Zero Contracting Operations (PZCO) FIGURE 4. CONTRACTING PHASE ZERO: PLAN, EXERCISE, REHEARSE, AND SYNCHRONIZE Note. BPA = Blanket...More Robust Construction Supplies; Oce Equipment; Quality of Life; and Morale, Welfare, and Recreation PO/TO/DO/ BPA Small Purchase Standard Vehicles PO...TO/DO/ BPA Small Purchase Standard Vehicles PO/TO/DO/ BPA Small Purchase Standard Vehicles PO/TO/DO/ BPA Small Purchase Food, Water, Billeting, Hygiene

  8. [An attempt to use ultrasonic technique for confirming the diagnosis, planning and observation of long-term treatment results of painful temporo-mandibular joint dysfunction].

    PubMed

    Ey-Chmielewska, H

    1998-01-01

    The author presents an attempt of using ultrasonographic technique in diagnosis, planning and observation of treatment results of temporo-mandibular joint pain dysfunctions. Temporo-mandibular joint pain dysfunctions are interchangeably also called temporo-mandibular joint functional disorders. The assessment of pain symptoms in temporo-mandibular joint dysfunctions pain symptoms is principally based on a subjective estimation by the examining practitioner. There is no univocal definition of the disease or a simple index evidencing important symptoms in decision making. Additionally X-ray technique examinations, being hitherto used, in early stages of the disorder do not allow to diagnose it, and are also burdensome to a patient. The aim of this study was to confirm visibility of anatomical elements of the temporo-mandibular joint in an ultrasound examination, assess the mobility of the articular disc before, during and after prosthetic treatment with and without the use of ultrasound technique, and to determine the period of time necessary to obtain a therapeutic effect. The study material consisted of 180 patients, 128 women and 52 men, aged 20 to 60 years, treated by applying prostheses because of temporo-mandibular joint pain dysfunction, in the Department of Prosthetic Dentistry of the Pomeranian Medical Academy. The patients were divided into 2 groups, control and study group. The control group consisted of 90 patients, 63 women and 27 men. In this group prosthetic treatment planning and observation of results was based on a subjective estimation of the practitioner. The study group here comprised 90 patients, 65 women and 25 men, aged 26 to 60 years. In this group prosthetic treatment planning and observation of treatment results were carried on with the use of ultrasound technique. Data from both groups concerning history, results of examinations carried out by ultrasound technique, and the assessment of ultrasound examination were noted on standard

  9. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    NASA Technical Reports Server (NTRS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  10. Structuring modeling and simulation analysis for evacuation planning and operations.

    DOT National Transportation Integrated Search

    2009-06-01

    This document is intended to provide guidance to decision-makers at agencies and jurisdictions considering the role of analytical tools in evacuation planning and operations. It is often unclear what kind of analytical approach may be of most value, ...

  11. Economic analysis for transmission operation and planning

    NASA Astrophysics Data System (ADS)

    Zhou, Qun

    2011-12-01

    Restructuring of the electric power industry has caused dramatic changes in the use of transmission system. The increasing congestion conditions as well as the necessity of integrating renewable energy introduce new challenges and uncertainties to transmission operation and planning. Accurate short-term congestion forecasting facilitates market traders in bidding and trading activities. Cost sharing and recovery issue is a major impediment for long-term transmission investment to integrate renewable energy. In this research, a new short-term forecasting algorithm is proposed for predicting congestion, LMPs, and other power system variables based on the concept of system patterns. The advantage of this algorithm relative to standard statistical forecasting methods is that structural aspects underlying power market operations are exploited to reduce the forecasting error. The advantage relative to previously proposed structural forecasting methods is that data requirements are substantially reduced. Forecasting results based on a NYISO case study demonstrate the feasibility and accuracy of the proposed algorithm. Moreover, a negotiation methodology is developed to guide transmission investment for integrating renewable energy. Built on Nash Bargaining theory, the negotiation of investment plans and payment rate can proceed between renewable generation and transmission companies for cost sharing and recovery. The proposed approach is applied to Garver's six bus system. The numerical results demonstrate fairness and efficiency of the approach, and hence can be used as guidelines for renewable energy investors. The results also shed light on policy-making of renewable energy subsidies.

  12. 24 CFR 943.128 - How does a consortium carry out planning and reporting functions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING AGENCY CONSORTIA AND JOINT VENTURES... the consortium agreement, the consortium must submit joint five-year Plans and joint Annual Plans for... the joint PHA Plan. ...

  13. Federal Radionavigation Plan. Volume I. Radionavigation Plans and Policy.

    DOT National Transportation Integrated Search

    1980-01-01

    The Federal Radionavigation Plan (FRP) has been jointly developed by the U.S. Departments of Defense and Transportation to ensure efficient use of resources and full protection of national interests. The plan sets forth the Federal interagency approa...

  14. [Computer-assisted operational planning for pediatric abdominal surgery. 3D-visualized MRI with volume rendering].

    PubMed

    Günther, P; Tröger, J; Holland-Cunz, S; Waag, K L; Schenk, J P

    2006-08-01

    Exact surgical planning is necessary for complex operations of pathological changes in anatomical structures of the pediatric abdomen. 3D visualization and computer-assisted operational planning based on CT data are being increasingly used for difficult operations in adults. To minimize radiation exposure and for better soft tissue contrast, sonography and MRI are the preferred diagnostic methods in pediatric patients. Because of manifold difficulties 3D visualization of these MRI data has not been realized so far, even though the field of embryonal malformations and tumors could benefit from this.A newly developed and modified raycasting-based powerful 3D volume rendering software (VG Studio Max 1.2) for the planning of pediatric abdominal surgery is presented. With the help of specifically developed algorithms, a useful surgical planning system is demonstrated. Thanks to the easy handling and high-quality visualization with enormous gain of information, the presented system is now an established part of routine surgical planning.

  15. Joint Operations. Change 1

    DTIC Science & Technology

    2008-02-13

    procedures not ratified by the United States, commanders should evaluate and follow the multinational command’s doctrine and procedures, where applicable... human intelligence sources to be effective and implementation of appropriate force protection measures regardless of the operational...intelligence requirements needed to support the anticipated operation. Human intelligence often may provide the most useful source of information. Even

  16. [COMPARISON OF EFFECTIVENESS BETWEEN TWO OPERATIVE TECHNIQUES OF CORACOCLAVICULAR LIGAMENT RECONSTRUCTION FOR TREATMENT OF Tossy TYPE III ACROMIOCLAVICULAR JOINT DISLOCATION].

    PubMed

    Tang, Hongwei; Gao, Sheng; Yin, Yong; Li, Yunfei; Han, Qingtian; Li, Huizhang

    2015-11-01

    To evaluate and compare the effectiveness of double Endobutton technique and suture anchor combined Endobutton plate in the treatment of Tossy type III acromioclavicular joint dislocation. Between May 2010 and March 2014, a retrospective study was preformed on 56 patients with Tossy type III acromioclavicular joint dislocation. The coracoclavicular ligament was reconstructed with double Endobutton technique in 31 cases (Endobutton group), and with suture anchor combined Endobutton plate in 25 cases (Anchor group). There was no significant difference in age, gender, injury causes, injury side, associated injury, medical comorbidities, and disease duration between 2 groups (P>0.05). The operation time, medical device expenses, postoperative complications, preoperative and postoperative Constant-Murley scores, and postoperative Karlsson grading of the injured shoulder were compared between 2 groups. The average operation time in Endobutton group was significantly greater than that in Anchor group (t = 4.285, P = 0.000); there was no significant difference in the medical device expenses between 2 groups (t = 1.555, P = 0.126). Primary healing of incision was obtained in all patients of 2 groups; no early complications of infection and skin necrosis occurred. All patients were followed up 15.6 months on average (range, 11-35 months). During follow-up, some loss of reduction and ectopic ossification in the coracoclavicular gap were observed in 1 case and 6 cases of Endobutton group, respectively. No recurrence of acromioclavicular joint dislocation, implant fixation loosening and broken, and secondary fractures occurred in the other patients. There was significant difference in the incidence of postoperative complications between 2 groups (P = 0.013). Constant-Murley scores of the injured shoulder significantly increased at 9 months after operation when compared with preoperative values in 2 groups (P < 0.05), but no significant difference was observed between 2 groups

  17. Structural Degradation of the Welded Joint of the Gas Main after a Long-Term Operation in Sub-Acid Soil

    NASA Astrophysics Data System (ADS)

    Maruschak, P. O.; Bishchak, R. T.; Maruschak, O. V.; Panin, S. V.

    2018-01-01

    The authors investigated the main regularities in the structural and mechanical degradation of steel and a welded joint of the “Soyuz” gas main in operation. It is established that the defect accumulation kinetics in welds are determined both by technological disruptions in their manufacture and by hydrogenation of the weld during a long operating time. A weakening of the mechanical properties of the weld after a prolonged operation is shown, which in some cases led to the appearance of cracks and fracture of the gas main.

  18. Joint Operating Environment: The Joint Force in a Contested and Disordered World

    DTIC Science & Technology

    2016-07-14

    spilling over borders, and creating wide-ranging international problems. The future of Science, Technology, and Engineering will see others reaching...10 Science, Technology, and Engineering and the Future Joint Force ..........................................15 Summary... Engineering – may lead to new and challenging conditions that will redefine the security environment of 2035.  Section 2: Contexts of Future Conflict

  19. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    NASA Technical Reports Server (NTRS)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning

  20. Campaign Plan Formulation and the Deliberate Planning Process: Linking the Strategic and Operational Levels of War. Considerations and Implications for Strategic and Operational Level Planners,

    DTIC Science & Technology

    1988-04-11

    Monograph Director I. Lieutenant Colonel Charles D. Daves , M.S. l, e ’- i % 4 ’- Director, School of Colonel L.D. Holder, M.A. Advanced Military...operations within the campaign plan. Phase I (1 April-30 June 1945) envisioned American forces seizing airfields and anchorages in the Bonin and...occupied as a result of operations commencing December 1944. Additionally, the planners relied on the seizure of Iwo Jima in the Bonin islands and the

  1. The Royal Naval Medical Services: delivering medical operational capability. the 'black art' of Medical Operational Planning.

    PubMed

    Faye, M

    2013-01-01

    This article looks to dispel the mysteries of the 'black art' of Medical Operational Planning whilst giving an overview of activity within the Medical Operational Capability area of Medical Division (Med Div) within Navy Command Headquarters (NCHQ) during a period when the Royal Naval Medical Services (RNMS) have been preparing and reconfiguring medical capability for the future contingent battle spaces. The rolling exercise program has been used to illustrate the ongoing preparations taken by the Medical Operational Capability (Med Op Cap) and the Medical Force Elements to deliver medical capability in the littoral and maritime environments.

  2. Operational Planning for Multiple Heterogeneous Unmanned Aerial Vehicles in Three Dimensions

    DTIC Science & Technology

    2009-06-01

    human input in the planning process. Two solution methods are presented: (1) a mixed-integer program, and (2) an algorithm that utilizes a metaheuristic ...and (2) an algorithm that utilizes a metaheuristic to generate composite variables for a linear program, called the Composite Operations Planning...that represent a path and an associated type of UAV. The reformulation is incorporated into an algorithm that uses a metaheuristic to generate the

  3. Sensitivity of a juvenile subject-specific musculoskeletal model of the ankle joint to the variability of operator-dependent input

    PubMed Central

    Hannah, Iain; Montefiori, Erica; Modenese, Luca; Prinold, Joe; Viceconti, Marco; Mazzà, Claudia

    2017-01-01

    Subject-specific musculoskeletal modelling is especially useful in the study of juvenile and pathological subjects. However, such methodologies typically require a human operator to identify key landmarks from medical imaging data and are thus affected by unavoidable variability in the parameters defined and subsequent model predictions. The aim of this study was to thus quantify the inter- and intra-operator repeatability of a subject-specific modelling methodology developed for the analysis of subjects with juvenile idiopathic arthritis. Three operators each created subject-specific musculoskeletal foot and ankle models via palpation of bony landmarks, adjustment of geometrical muscle points and definition of joint coordinate systems. These models were then fused to a generic Arnold lower limb model for each of three modelled patients. The repeatability of each modelling operation was found to be comparable to those previously reported for the modelling of healthy, adult subjects. However, the inter-operator repeatability of muscle point definition was significantly greater than intra-operator repeatability (p < 0.05) and predicted ankle joint contact forces ranged by up to 24% and 10% of the peak force for the inter- and intra-operator analyses, respectively. Similarly, the maximum inter- and intra-operator variations in muscle force output were 64% and 23% of peak force, respectively. Our results suggest that subject-specific modelling is operator dependent at the foot and ankle, with the definition of muscle geometry the most significant source of output uncertainty. The development of automated procedures to prevent the misplacement of crucial muscle points should therefore be considered a particular priority for those developing subject-specific models. PMID:28427313

  4. Building Partnership Capacity: Operation Harmattan and Beyond

    DTIC Science & Technology

    2012-10-01

    exclusion zone over Deauville, Normandy, during the G -8 conference in May 2011.27 Further, beginning 1 July, the FAF took the lead of NATO Response... Planification et de Conduite des Opérations (Joint Operations and Planning Center) in Paris. The French chief of defense staff presented the imagery...Institut Charles de Gaulle, accessed 26 July 2012, http://de-gaulle-edu.net/sentrainer/trois_commt/certaineidee.htm. 79. Leo G . Michel, Cross-Currents

  5. [Implementation of joint-crisis plans--a study of health care users and professionals].

    PubMed

    Grätz, Juliane; Brieger, Peter

    2012-11-01

    To study effects of the implementation of joint-crisis plans (JCP) on health-care users and professionals. The first 3 years of the implementation of JCP were followed with structured interviews with health-care users and professionals. Legal and administrative complications were documented. 36 of 44 subjects with JCP were assessed. Most of them had learned of JCP through other users or self-help. 55 % had prior experience with compulsory treatment. Better communication and self-determination were main goals of JCP. A relevant change in hospital treatment through JCP was not observed. Only few professionals had made direct experience with JCP. They valued JCP mildly positive. No legal and administrative complications were documented. Only a small minority of users signed JCP. JCP were easily employed and improved communication and self-determination. © Georg Thieme Verlag KG Stuttgart · New York.

  6. 41 CFR Appendix B to Part 102 - 37-Elements of a State Plan of Operation

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Plan of Operation B Appendix B to Part 102 Public Contracts and Property Management Federal Property... SURPLUS PERSONAL PROPERTY Pt. 102-37, App. B Appendix B to Part 102-37—Elements of a State Plan of... title of the State official who directly supervises the State agent. (b) Operational authority Include...

  7. Zero Gravity Flights as the Most Effective Embryonic Operation for Planned Commercial Spaceport

    NASA Astrophysics Data System (ADS)

    Abu Samah, Shamsul Kamar; Ridzuan Zakaria, Norul; Nasrun, Nasri; Abu, Jalaluddin; Muszaphar Shukor, Dato'Sheikh

    2013-09-01

    From the experience gained by the management team of Spaceport Malaysia, a popular service that can be provided by a planned commercial spaceport in a country without existing space travel infrastructure are zero gravity flights. Zero gravity flights range from parabolic flights using aerobatic airplane to suborbital flights using rockets, and in the near future using suborbital rocketplanes. Therefore, zero gravity flights can be operated from a certified runway or planned for operation at a future commercial spaceport. With such range of operation, zero gravity flights provide a natural link between a low cost operation of small airplane to exclusive high profile operation of suborbital rocketplane, and this attracts the attention of individuals and organizations that are planning for the establishment of a commercial spaceport. This is the approach chosen by the planners and developers of Spaceport Malaysia. A significant factor in zero gravity flight is the zero gravity time, the period where the payload onboard the airplane or rocketplane will experience zero gravity. Based on the momentum of the airplane or rocketplane, the zero gravity time may vary from few seconds to few minutes and that determines the quality of the zero gravity flight. To achieve zero gravity, the airplane or rocketplane will fly with a steady velocity for a significant time as a gravity control flight, accelerate upwards with an angle producing hypergravity and perform parabolic flight with natural momentum producing zero gravity and followed by dive that will result in another hypergravity flight. 2 zero gravity platforms being considered for operation at and by Spaceport Malaysia are F-5E Tiger II and Airbus A300, since both platforms have been successfully used by a partner of Spaceport Malaysia in performing zero gravity flights. An F-5E fighter jet owned by Royal Malaysian Air Force is being planned to be converted into a zero gravity platform to be operated at and by Spaceport

  8. 36 CFR 292.66 - Operating plan requirements-outstanding mineral rights.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-outstanding mineral rights. 292.66 Section 292.66 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Outstanding Mineral Rights § 292.66 Operating plan requirements—outstanding mineral rights. (a) Proposals for mineral...

  9. 36 CFR 292.66 - Operating plan requirements-outstanding mineral rights.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-outstanding mineral rights. 292.66 Section 292.66 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Outstanding Mineral Rights § 292.66 Operating plan requirements—outstanding mineral rights. (a) Proposals for mineral...

  10. 36 CFR 292.66 - Operating plan requirements-outstanding mineral rights.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-outstanding mineral rights. 292.66 Section 292.66 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Outstanding Mineral Rights § 292.66 Operating plan requirements—outstanding mineral rights. (a) Proposals for mineral...

  11. 36 CFR 292.66 - Operating plan requirements-outstanding mineral rights.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-outstanding mineral rights. 292.66 Section 292.66 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Outstanding Mineral Rights § 292.66 Operating plan requirements—outstanding mineral rights. (a) Proposals for mineral...

  12. Planning criteria for express bus-fringe parking operations : volume I of express bus-fringe parking planning methodology.

    DOT National Transportation Integrated Search

    1975-01-01

    Tripmaker reactions to two recent express bus-fringe parking operations in Richmond and Norfolk-Virginia Beach Virginia are examined. This travel behavior's interpreted to establish planning and design guidelines for locating and designing fringe lot...

  13. Federal Radionavigation Plan. Vol. 1. Radionavigation Plans and Policy.

    DOT National Transportation Integrated Search

    1982-03-01

    The second edition of the Federal Radionavigation Plan (FRP) has been jointly developed by the U.S. Departments of Defense and Transportation to ensure efficient use of resources and full protection of national interests. The plan sets forth the Fede...

  14. The impact of joint ventures on U.S. hospitals.

    PubMed

    Harrison, Jeffrey P

    2006-01-01

    This quantitative research study assesses the organizational characteristics, market factors, and profitability of US hospitals that operate joint ventures with other health care organizations. Data was obtained from the 2001 American Hospital Association annual survey, the Area Resource File, and the Center for Medicare and Medicaid Services Minimum Data Set. These data files provide essential information on individual acute care hospitals, the communities they serve, and the level of financial performance. Descriptive statistics were evaluated and a logistic regression model was utilized to examine hospitals operating joint ventures. The study found hospitals that operate joint ventures are located in communities with more elderly patients, lower unemployment, and lower HMO penetration. From an operating performance perspective, hospitals that operate joint ventures have a higher occupancy rate, a higher average length of stay, more clinical services, lower long-term debt, and a greater number of managed care contracts. The results also appear to indicate that joint ventures have a positive financial impact on US hospitals. The study has managerial implications supporting the use of joint ventures to improve hospital performance and policy implications on resource allocation.

  15. Foreword for the Special Section on Power System Planning and Operation Towards a Low-Carbon Economy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ding, Yi; Kang, Chongqing; Wang, Jianhui

    2015-03-01

    The nine papers in this special section on power system planning and operation towards a low-cost economy cover the following topics: power system planning models; power system operation methods and market behavior analysis; and risk assessment and emission management.

  16. Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

    NASA Technical Reports Server (NTRS)

    Hitz, F. R.

    1976-01-01

    The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

  17. Patient-specific musculoskeletal modeling of the hip joint for preoperative planning of total hip arthroplasty: A validation study based on in vivo measurements

    PubMed Central

    Schick, Fabian; Asseln, Malte; Damm, Philipp; Radermacher, Klaus

    2018-01-01

    Validation of musculoskeletal models for application in preoperative planning is still a challenging task. Ideally, the simulation results of a patient-specific musculoskeletal model are compared to corresponding in vivo measurements. Currently, the only possibility to measure in vivo joint forces is to implant an instrumented prosthesis in patients undergoing a total joint replacement. In this study, a musculoskeletal model of the AnyBody Modeling System was adapted patient-specifically and validated against the in vivo hip joint force measurements of ten subjects performing one-leg stance and level walking. The impact of four model parameters was evaluated; hip joint width, muscle strength, muscle recruitment, and type of muscle model. The smallest difference between simulated and in vivo hip joint force was achieved by using the hip joint width measured in computed tomography images, a muscle strength of 90 N/cm2, a third order polynomial muscle recruitment, and a simple muscle model. This parameter combination reached mean deviations between simulation and in vivo measurement during the peak force phase of 12% ± 14% in magnitude and 11° ± 5° in orientation for one-leg stance and 8% ± 6% in magnitude and 10° ± 5° in orientation for level walking. PMID:29649235

  18. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    NASA Technical Reports Server (NTRS)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  19. Design and clinical outcome of a novel 3D-printed prosthetic joint replacement for the human temporomandibular joint.

    PubMed

    Ackland, David; Robinson, Dale; Lee, Peter Vee Sin; Dimitroulis, George

    2018-05-11

    Stock prosthetic temporomandibular joint replacements come in limited sizes, and do not always encompass the joint anatomy that presents clinically. The aims of this study were twofold. Firstly, to design a personalized prosthetic total joint replacement for the treatment of a patient's end-stage temporomandibular joint osteoarthritis, to implant the prosthesis into the patient, and assess clinical outcome 12-months post-operatively; and secondly, to evaluate the influence of changes in prosthetic condyle geometry on implant load response during mastication. A 48-year-old female patient with Grade-5 osteoarthritis to the left temporomandibular joint was recruited, and a prosthesis developed to match the native temporomandibular joint anatomy. The prosthesis was 3D printed, sterilized and implanted into the patient, and pain and function measured 12-months post-operatively. The prosthesis load response during a chewing-bite and maximum-force bite was evaluated using a personalized multi-body musculoskeletal model. Simulations were performed after perturbing condyle thickness, neck length and head sphericity. Increases in prosthetic condyle neck length malaligned the mandible and perturbed temporomandibular joint force. Changes in condylar component thickness greatly influenced fixation screw stress response, while a more eccentric condylar head increased prosthetic joint-contact loading. Post-operatively, the prosthetic temporomandibular joint surgery reduced patient pain from 7/10 to 1/10 on a visual analog scale, and increased intercisal opening distance from 22 mm to 38 mm. This study demonstrates effectiveness of a personalized prosthesis that may ultimately be adapted to treat a wide-range of end-stage temporomandibular joint conditions, and highlights sensitivity of prosthesis load response to changes in condylar geometry. Copyright © 2018 Elsevier Ltd. All rights reserved.

  20. Air-Sea Battle through Joint Training: Power Projection Sustainability

    DTIC Science & Technology

    2014-05-15

    9 generate our decisive advantage.” 39 An example of cross-domain operations employed by the USN and USAF was the release of an AGM-154C Joint...and Herzegovina. While employing a USAF GBU -15 “electro-optically guided” bomb within close range of a USN AGM-84 SLAM-ER, “electronic... 39 U.S. Office of the Chairman, Joint Chiefs of Staff. Capstone Concept for Joint Operations: Joint Force 2020