Sample records for jointless bridges

  1. Jointless bridges : interim report.

    DOT National Transportation Integrated Search

    1980-01-01

    Presented is a summary of jointless bridge designs as twelve states; namely, California, Colorado, Idaho, Iowa, Kansas, Missouri, Nebraska, North Dakota, South Dakota, Tennessee, Virginia, and Wisconsin. Most of these states use some form of integral...

  2. Performance monitoring of jointless bridges : phase III.

    DOT National Transportation Integrated Search

    2014-05-01

    Part I: : The third phase of a research project investigating the field performance of jointless bridges is reported. Three : integral abutment bridges in Vermont, US have been instrumented and monitored as part of this research. : General descriptio...

  3. Long-term behavior of integral abutment bridges : [technical summary].

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment bridges, a type of jointless bridge, are the construction option of choice when designing highway bridges in many parts of the country. Rather than providing an expansion joint to separate the substructure from the superstructure to...

  4. Jointless bridges : final report.

    DOT National Transportation Integrated Search

    1981-01-01

    The results of this study are reported in two parts. The first deals with the various methods states are employing to reduce the number of joints in bridge decks. The most common method is the use of integral abutments, where the superstructure is jo...

  5. Effects of ambient temperature changes on integral bridges.

    DOT National Transportation Integrated Search

    2008-09-01

    Integral bridges (IBs) are jointless bridges whereby the deck is continuous and monolithic with abutment walls. IBs are outperforming their non-integral counterparts in economy and safety. Their principal advantages are derived from the absence of ex...

  6. Jointness or Jointless at Leyte

    DTIC Science & Technology

    1989-03-31

    tol JOINTNESS OR JOINTLESS AT LEYTE BY LIEUTENANT COLONEL KENNY J. JEFFERSON DESTRIBUTION STATMMERT A: Approved IoT Publ.C rx f. df trf~iitien Is...and to -support the operation with naval, air force, and submarine weapon systems and Vrotect against Japanese invasion forces from the surrounding...as the "early warning system " for the fleet and independently engage targets with torpedoes. Admiral Nishimura’s Force C would be the first to enter

  7. Forces in wingwalls from thermal expansion of skewed semi-integral bridges.

    DOT National Transportation Integrated Search

    2010-11-01

    Jointless bridges, such as semi-integral and integral bridges, have become more popular in recent years because of their simplicity in the construction and the elimination of high costs related to joint maintenance. Prior research has shown that skew...

  8. Sequence and Analysis of the Tomato JOINTLESS Locus1

    PubMed Central

    Mao, Long; Begum, Dilara; Goff, Stephen A.; Wing, Rod A.

    2001-01-01

    A 119-kb bacterial artificial chromosome from the JOINTLESS locus on the tomato (Lycopersicon esculentum) chromosome 11 contained 15 putative genes. Repetitive sequences in this region include one copia-like LTR retrotransposon, 13 simple sequence repeats, three copies of a novel type III foldback transposon, and four putative short DNA repeats. Database searches showed that the foldback transposon and the short DNA repeats seemed to be associated preferably with genes. The predicted tomato genes were compared with the complete Arabidopsis genome. Eleven out of 15 tomato open reading frames were found to be colinear with segments on five Arabidopsis bacterial artificial chromosome/P1-derived artificial chromosome clones. The synteny patterns, however, did not reveal duplicated segments in Arabidopsis, where over half of the genome is duplicated. Our analysis indicated that the microsynteny between the tomato and Arabidopsis genomes was still conserved at a very small scale but was complicated by the large number of gene families in the Arabidopsis genome. PMID:11457984

  9. Field study of integral backwall with elastic inclusion.

    DOT National Transportation Integrated Search

    2005-01-01

    Jointless construction is considered an effective design option to reduce bridge maintenance costs and resist seismic loads. Although these attributes make the integral bridge an increasingly popular choice, soil-structure interaction issues unique t...

  10. Identification of causes and solution strategies for deck cracking in jointless bridges : research report.

    DOT National Transportation Integrated Search

    2012-07-01

    Bridges have traditionally relied on a system of expansion joints and flexible bearings to accommodate movements due to temperature, creep, and shrinkage loading. Joints and elements in their vicinity experience a high amount of degradation; thus mod...

  11. Identification of Causes and Solution Strategies for Deck Cracking in Jointless Bridges : Technical Report Documentation Page

    DOT National Transportation Integrated Search

    2012-07-30

    Bridges have traditionally relied on a system of expansion joints and flexible bearings to accommodate movements due to temperature, creep, and shrinkage loading. Joints and elements in their vicinity experience a high amount of degradation; thus mod...

  12. Elimination of deck joints using a corrosion resistant FRP approach.

    DOT National Transportation Integrated Search

    2009-09-01

    The research presented herein describes the development of durable link slabs for jointless bridge decks based on : using a fiber reinforced polymer (FRP) grid for reinforcement. Specifically the ductility of the FRP material was : utilized to accomm...

  13. Elimination of deck joints using a corrosion resistant FRP approach.

    DOT National Transportation Integrated Search

    2009-09-01

    The research presented herein describes the development of durable link slabs for jointless bridge decks based on using a fiber reinforced polymer (FRP) grid for reinforcement. Specifically the ductility of the FRP material was utilized to accommodat...

  14. Elimination of deck joints using a corrosion resistant FRP approach

    NASA Astrophysics Data System (ADS)

    Aleti, Ashok Reddy

    The research presented herein describes the development of durable link slabs for jointless bridge decks based on using FRP grid for reinforcement. Specifically, the ductility of the FRP material was utilized to accommodate bridge deck deformations imposed by girder deflection, temperature variations, and concrete shrinkage. It would also provide a solution to a number of deterioration problems associated with bridge deck joints. The design concept of the link slabs was then examined to form the basis of design for FRP grid link slabs. Improved design of FRP grid link slab/concrete deck slab interface was confirmed in the numerical analysis. The mechanical properties between the FRP grid and concrete were evaluated. The behavior of the link slab was investigated and confirmed for durability. The results indicated that the technique would allow simultaneous achievement of structural need (lower flexural stiffness of the link slab approaching the behavior of a hinge) and durability need of the link slab. Also, the development length results confirm that the bond between the FRP grid and the concrete was highly improved. The overall investigation supports the contention that durable jointless concrete bridge decks may be designed and constructed with FRP grid link slabs. It is recommended that the link slab technique be used during new construction of the bridge decks and in repair and retrofit of the bridge decks.

  15. Three Bridge Fryer's Ford Bridge, Nimrod Bridge, and Ward's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Three Bridge - Fryer's Ford Bridge, Nimrod Bridge, and Ward's Crossing Bridge - Fryer's Ford Bridge, Spanning East Fork of Point Remove Creek at Fryer Bridge Road (CR 67), Solgohachia, Conway County, AR

  16. Roy D. Bridges Bridge

    NASA Image and Video Library

    2003-08-06

    From left, incoming KSC Director James W. Kennedy looks on as departing KSC Director Roy D. Bridges Jr. shakes hands with the 45th Space Wing Commander Brig. Gen. J. Gregory Pavlovich. The occasion is the unveiling of the new sign on the NASA Causeway naming the bridge for Bridges who is leaving KSC to become the director of NASA's Langley Research Center, Hampton, Va. The bridge spans the Banana River on the NASA Causeway and connects Kennedy Space Center and Cape Canaveral Air Force Station.

  17. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  18. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  19. 47 CFR 80.331 - Bridge-to-bridge communication procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Bridge-to-bridge communication procedure. 80..., Alarm, Urgency and Safety Procedures § 80.331 Bridge-to-bridge communication procedure. (a) Vessels subject to the Bridge-to-Bridge Act transmitting on the designated navigational frequency must conduct...

  20. 47 CFR 80.331 - Bridge-to-bridge communication procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge communication procedure. 80..., Alarm, Urgency and Safety Procedures § 80.331 Bridge-to-bridge communication procedure. (a) Vessels subject to the Bridge-to-Bridge Act transmitting on the designated navigational frequency must conduct...

  1. BridgePBEE | BridgePBEE

    Science.gov Websites

    jacking Item 22: Bridge removal (column) Item 23: Bridge removal (portion) Item 24: Approach slab removal for: Search Menu Log in Register PEER Center - 325 Davis Hall, University of California, Berkeley, CA

  2. Myocardial Bridge

    MedlinePlus

    ... Center > Myocardial Bridge Menu Topics Topics FAQs Myocardial Bridge En español Your heart is made of muscle, ... surface of the heart. What is a myocardial bridge? A myocardial bridge is a band of heart ...

  3. An improved bridge safety index for narrow bridges.

    DOT National Transportation Integrated Search

    1983-08-01

    In this report, a new bridge safety index is developed based upon an extensive : statistical study of accident data on 78 bridges. A total of 655 accidents : were recorded at these bridges over the six-year period between 1974 and 1979. : Cluster ana...

  4. 28. BRIDGE NO. 9 APRON AND BRIDGE HINGE JOINT AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. BRIDGE NO. 9 APRON AND BRIDGE HINGE JOINT AND BRIDGE SUSPENSION SYSTEM SHOWING EYEBAR AND CABLE CONNECTIONS. LOOKING WEST. - Greenville Yard, Transfer Bridge System, Port of New York/New Jersey, Upper New York Bay, Jersey City, Hudson County, NJ

  5. Bridge permeameter

    DOEpatents

    Graf, Darin C.; Warpinski, Norman R.

    1996-01-01

    A system for single-phase, steady-state permeability measurements of porous rock utilizes a fluid bridge arrangement analogous to a Wheatstone bridge. The arms of the bridge contain the sample and calibrated flow resistors.

  6. 29. BRIDGE NO. 13 APRON AND BRIDGE HINGE JOINT AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. BRIDGE NO. 13 APRON AND BRIDGE HINGE JOINT AND BRIDGE SUSPENSION SYSTEM (OLDER STYLE) SHOWING EYEBAR AND CABLE CONNECTIONS. LOOKING WEST. - Greenville Yard, Transfer Bridge System, Port of New York/New Jersey, Upper New York Bay, Jersey City, Hudson County, NJ

  7. 5. View of Clark Fork Vehicle Bridge facing east. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. View of Clark Fork Vehicle Bridge facing east. Bridge from south shore of Clark Fork River-southernmost span. 1900-era Northern Pacific Railway Bridge in background. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  8. Bridge permeameter

    DOEpatents

    Graf, D.C.; Warpinski, N.R.

    1996-08-13

    A system is described for single-phase, steady-state permeability measurements of porous rock which utilizes a fluid bridge arrangement analogous to a Wheatstone bridge. The arms of the bridge contain the sample and calibrated flow resistors. 8 figs.

  9. Bridge permeameter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Graf, D.C.; Warpinski, N.R.

    A system is described for single-phase, steady-state permeability measurements of porous rock which utilizes a fluid bridge arrangement analogous to a Wheatstone bridge. The arms of the bridge contain the sample and calibrated flow resistors. 8 figs.

  10. Long-term bridge performance high priority bridge performance issues.

    DOT National Transportation Integrated Search

    2014-10-01

    Bridge performance is a multifaceted issue involving performance of materials and protective systems, : performance of individual components of the bridge, and performance of the structural system as a whole. The : Long-Term Bridge Performance (LTBP)...

  11. OVERVIEW OF BRIDGES WITH WAIKELE CANAL BRIDGE IN CENTER, OR&L ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERVIEW OF BRIDGES WITH WAIKELE CANAL BRIDGE IN CENTER, OR&L BRIDGE IN BACKGROUND. SHOWING THE EARTHEN INCLINE THAT RAISES FARRINGTON HIGHWAY OVER THE FORMER OR&L TRACKS. NOTE THE 1963 WESTBOUND BRIDGE IN THE FOREGROUND. VIEW FACING EAST. - Waikele Canal Bridge and Highway Overpass, Farrington Highway and Waikele Stream, Waipahu, Honolulu County, HI

  12. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  13. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  14. Kinetic bridges.

    DOT National Transportation Integrated Search

    1980-01-01

    This report on kinetic bridges is essentially a state-of-the-art study on two types of bridges whose location or physical characteristics are designed to be time dependent. The first type, called a "relocatable bridge", is essentially for use as a te...

  15. Bridge health monitoring metrics : updating the bridge deficiency algorithm.

    DOT National Transportation Integrated Search

    2009-10-01

    As part of its bridge management system, the Alabama Department of Transportation (ALDOT) must decide how best to spend its bridge replacement funds. In making these decisions, ALDOT managers currently use a deficiency algorithm to rank bridges that ...

  16. Guardrails for use on historic bridges: volume 2--bridge deck overhang design.

    DOT National Transportation Integrated Search

    2016-11-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are : made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridge...

  17. 47 CFR 80.309 - Watch required by the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Watch required by the Bridge-to-Bridge Act. 80... Safety Watches § 80.309 Watch required by the Bridge-to-Bridge Act. In addition to the watch requirement contained in § 80.148, all vessels subject to the Bridge-to-Bridge Act must keep a watch on the designated...

  18. 47 CFR 80.309 - Watch required by the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Watch required by the Bridge-to-Bridge Act. 80... Safety Watches § 80.309 Watch required by the Bridge-to-Bridge Act. In addition to the watch requirement contained in § 80.148, all vessels subject to the Bridge-to-Bridge Act must keep a watch on the designated...

  19. 1. View of bridge from Interstate 195 (Washington Bridge) looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. View of bridge from Interstate 195 (Washington Bridge) looking southwest - India Point Railroad Bridge, Spanning Seekonk River between Providence & East Providence, Providence, Providence County, RI

  20. Field performance of timber bridges. 7, Connell Lake stress-laminated deck bridge

    Treesearch

    L. E. Hislop; M. A. Ritter

    The Connell Lake bridge was constructed in early 1991 on the Tongass National Forest, Alaska, as a demonstration bridge under the Timber Bridge Initiative. The bridge is a stress-laminated deck structure with an approximate 36-ft length and 18-ft width and is the first known stress-laminated timber bridge constructed in Alaska. Performance of the bridge was monitored...

  1. GOETHALS BRIDGE FROM NORTH SIDE OVER ARTHUR KILL. RAILROAD BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GOETHALS BRIDGE FROM NORTH SIDE OVER ARTHUR KILL. RAILROAD BRIDGE IN FOREGROUND - Goethals Bridge, Spanning Arthur Kill from New Jersey to Staten Island, Staten Island (subdivision), Richmond County, NY

  2. LOOKING WEST, BETWEEN READING DEPOT BRIDGE AND SKEW ARCH BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LOOKING WEST, BETWEEN READING DEPOT BRIDGE AND SKEW ARCH BRIDGE (HAER No. PA-116). - Philadelphia & Reading Railroad, Reading Depot Bridge, North Sixth Street at Woodward Street, Reading, Berks County, PA

  3. Plans: Poop Deck, Boat Deck, Housetop, Bridge Deck, Upper Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Plans: Poop Deck, Boat Deck, Housetop, Bridge Deck, Upper Bridge Deck, Navigating Bridge, Forecastle Deck, Upper Deck, Second Deck and Hold - Saugatuck, James River Reserve Fleet, Newport News, Newport News, VA

  4. 1. VIEW OF SWING BRIDGE FROM KEDZIE AVENUE BRIDGE, LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF SWING BRIDGE FROM KEDZIE AVENUE BRIDGE, LOOKING EAST. - Chicago, Madison & Northern Railroad, Sanitary & Ship Canal Bridge, Spanning Sanitary & Ship Canal, east of Kedzie Avenue, Chicago, Cook County, IL

  5. 3. View of Clark Fork Vehicle Bridge facing southwest. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. View of Clark Fork Vehicle Bridge facing southwest. Bridge from north shore of Clark Fork River. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  6. OVERVIEW OF BRIDGES WITH OR&L BRIDGE IN CENTER, WAIKELE CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERVIEW OF BRIDGES WITH OR&L BRIDGE IN CENTER, WAIKELE CANAL BRIDGE IN BACKGROUND. SHOWING THE EARTHEN INCLINE THAT RAISES FARRINGTON HIGHWAY OVER THE FORMER OR&L TRACKS. VIEW FACING SOUTHWEST. - Waikele Canal Bridge and Highway Overpass, Farrington Highway and Waikele Stream, Waipahu, Honolulu County, HI

  7. 4. View of Clark Fork Vehicle Bridge facing northeast. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. View of Clark Fork Vehicle Bridge facing northeast. Bridge from south shoreof Clark Fork River showing 4 spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  8. 2. View of Clark Fork Vehicle Bridge facing northeast. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. View of Clark Fork Vehicle Bridge facing northeast. Bridge from south shore of Clark Fork River showing 4 1/2 spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  9. 7. View of Clark Fork Vehicle Bridge facing northwest. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. View of Clark Fork Vehicle Bridge facing northwest. Bridge from south shore of Clark Fork River showing 4 1/2 spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  10. 4. View of bridge deck from northeast approach (bridge deck ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. View of bridge deck from northeast approach (bridge deck from southwest approach is virtually identical - Big Cottonwood River Bridge No. 246, Spanning Big Cottonwood River at Cottonwood Street (City Road No. 165), New Ulm, Brown County, MN

  11. NYSDOT Bridge Deck Task Force evaluation of bridge deck cracking on NYSDOT bridges

    DOT National Transportation Integrated Search

    2007-02-01

    This paper presents a summary of knowledge gained by the NYSDOT Bridge Deck Task Force (BDTF). Although the paper contains recommendations to reduce the prevalence and severity of bridge deck cracking, it does not include a silver bullet soluti...

  12. Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge

    Treesearch

    J. P. Wacker; M. A. Ritter

    The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber...

  13. Bridges in complex networks

    NASA Astrophysics Data System (ADS)

    Wu, Ang-Kun; Tian, Liang; Liu, Yang-Yu

    2018-01-01

    A bridge in a graph is an edge whose removal disconnects the graph and increases the number of connected components. We calculate the fraction of bridges in a wide range of real-world networks and their randomized counterparts. We find that real networks typically have more bridges than their completely randomized counterparts, but they have a fraction of bridges that is very similar to their degree-preserving randomizations. We define an edge centrality measure, called bridgeness, to quantify the importance of a bridge in damaging a network. We find that certain real networks have a very large average and variance of bridgeness compared to their degree-preserving randomizations and other real networks. Finally, we offer an analytical framework to calculate the bridge fraction and the average and variance of bridgeness for uncorrelated random networks with arbitrary degree distributions.

  14. The hepatic bridge.

    PubMed

    Sugarbaker, Paul H

    2018-07-01

    The hepatic bridge forms a tunnel of liver parenchyma that may obscure peritoneal metastases associated with the round ligament. Visualization and then resection of nodules associated with this structure is necessary. The incidence of a hepatic bridge and the extent that it covered the round ligament was determined in consecutive patients. Extent of coverage of the round ligament by the hepatic bridge was determined: Class 1 indicates up to one-third of the round ligament obscured, Class 2 up to two-thirds and Class 3 more than two-thirds. In 102 patients in whom the round ligament of the liver could be completely visualized, 50 had a hepatic bridge. Class 1 was 22 (44%) of the bridges, Class 2 was 16 (32%) and Class 3 was 12 (24%). A hepatic bridge was more frequently present in 28 of 45 male patients (62%) vs. 22 of 57 female patients (38%). Approximately one-half of our patients having cytoreductive surgery for peritoneal metastases were observed to have a hepatic bridge. Up to 56% of these patients have Class 2 or 3 hepatic bridge and may require division of the hepatic bridge to completely visualize the contents of the tunnel created by this structure. Copyright © 2018 Elsevier Ltd, BASO ~ The Association for Cancer Surgery, and the European Society of Surgical Oncology. All rights reserved.

  15. Bridge resource program.

    DOT National Transportation Integrated Search

    2013-09-01

    The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge Engineering an...

  16. NCDOT : bridge policy

    DOT National Transportation Integrated Search

    1994-11-01

    NCDOTs Bridge Policy establishes controlling design elements for new and reconstructed bridges on the state road system. It includes information to address sidewalks and bicycle facilities on bridges, including minimum handrail heights and sidewal...

  17. Bridged graphite oxide materials

    NASA Technical Reports Server (NTRS)

    Herrera-Alonso, Margarita (Inventor); McAllister, Michael J. (Inventor); Aksay, Ilhan A. (Inventor); Prud'homme, Robert K. (Inventor)

    2010-01-01

    Bridged graphite oxide material comprising graphite sheets bridged by at least one diamine bridging group. The bridged graphite oxide material may be incorporated in polymer composites or used in adsorption media.

  18. 50. INTERIOR OF BRIDGE SUSPENSION STRUCTURE ABOVE BRIDGE NOS. 10 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. INTERIOR OF BRIDGE SUSPENSION STRUCTURE ABOVE BRIDGE NOS. 10 AND 9 SHOWING CABLE COUNTERWEIGHT SYSTEM AND SCREW-TYPE VERTICAL ADJUSTMENT MACHINERY (LIFTING SCREWS). LOOKING NORTH. - Greenville Yard, Transfer Bridge System, Port of New York/New Jersey, Upper New York Bay, Jersey City, Hudson County, NJ

  19. 16. LOG AND PLANK BRIDGE ON ACCESS ROAD NEAR BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. LOG AND PLANK BRIDGE ON ACCESS ROAD NEAR BRIDGE SITE; SAME STRUCTURE AS SHOWN IN PHOTO #12. ZION NP NEGATIVE NO. 967 ZIO. - Zion-Mount Carmel Highway, Virgin River Bridge, Spanning North Fork of Virgin River on Zion-Mount Carmel Highway, Springdale, Washington County, UT

  20. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek.

    DOT National Transportation Integrated Search

    2013-04-01

    The US Highway 6 Bridge over Keg Creek outside of Council Bluffs, Iowa is a demonstration bridge site chosen to put into practice : newly-developed Accelerated Bridge Construction (ABC) concepts. One of these new concepts is the use of prefabricated ...

  1. Instrumentation to Aid in Steel Bridge Fabrication : Bridge Virtual Assembly System

    DOT National Transportation Integrated Search

    2018-05-01

    This pool funded project developed a BRIDGE VIRTUAL ASSEMBLY SYSTEM (BRIDGE VAS) that improves manufacturing processes and enhances quality control for steel bridge fabrication. The system replaces conventional match-drilling with virtual assembly me...

  2. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction

    DOT National Transportation Integrated Search

    2017-09-01

    Concrete bridge decks are directly exposed to daily traffic loads and may experience some surface cracking caused by excessive stress or fatigue accumulation, which requires repair or replacement. Among typical bridges in North America, bridge decks ...

  3. BRIDGE BUILDER WILLIAM FLINN’S “CAMP & BRIDGE BUILDING OUTFIT”. INTERIOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BRIDGE BUILDER WILLIAM FLINN’S “CAMP & BRIDGE BUILDING OUTFIT”. INTERIOR VIEW SHOWING LABORERS AT MEAL TIME. - Clear Fork of Brazos River Suspension Bridge, Spanning Clear Fork of Brazos River at County Route 179, Albany, Shackelford County, TX

  4. Notable unbuilt bridges.

    DOT National Transportation Integrated Search

    1988-01-01

    Described and discussed in this exposition are a number of unusual or notable bridges proposed in this century that for various reasons were not built. Emphasis is placed on bridges in the United States, although some bridges in other countries are a...

  5. Field performance of timber bridges. 6, Hoffman Run stress-laminated deck bridge

    Treesearch

    M. A. Ritter; P. D. Hilbrich Lee; G. J. Porter

    The Hoffman Run bridge, located just outside Dahoga, Pennsylvania, was constructed in October 1990. The bridge is a simple-span, single-lane, stress-laminated deck superstructure that is approximately 26 ft long and 16 ft wide. It is the second stress-laminated timber bridge to be constructed of hardwood lumber in Pennsylvania. The performance of the bridge was...

  6. Bridge Programs in Illinois: Results of the 2010 Illinois Bridge Status Survey

    ERIC Educational Resources Information Center

    Taylor, J. L.; Harmon, T.

    2010-01-01

    This report provides a summary of major results of the Illinois Bridge Status Survey, administered online between April and June 2010. The purpose of the survey was to understand the extent to which bridge programs are being implemented in Illinois, as well as to build an online directory of bridge programs. Bridge programs are an emerging…

  7. Parryville Bridge (S.R. 2008, section 01B Bridge) looking north across ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Parryville Bridge (S.R. 2008, section 01B Bridge) looking north across traffic level, showing village of Parryville. - Parryville Bridge, State Route 2008 over Pohapoco Creek, Parryville, Carbon County, PA

  8. Bridge deterioration models to support Indiana's bridge management system.

    DOT National Transportation Integrated Search

    2016-02-01

    An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...

  9. Designing timber bridge superstructures : a comparison of U.S. and Canadian bridge codes.

    Treesearch

    James Scott Groenier; James P. Wacker

    2008-01-01

    Several changes relating to timber bridges have been incorporated into the AASHTO-LRFD Bridge Design Specifications recently. In addition, the Federal Highway Administration is strongly encouraging an LRFD-based design approach for all new bridges in the United States. The Bridge Design Code in Canada was one of the first to adopt the limit states design philosophy,...

  10. Field Performance of Timber Bridges. 16: North Siwell Road Stress-Laminated Bridge

    DOT National Transportation Integrated Search

    1998-03-01

    This report is 16th in a series of reports that documents the : field performance of timber bridges. The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single span, stress laminated T-beam ...

  11. Performance Assessment of Bridges Using GPS: The Juarez Bridge in Culiacan, Mexico

    NASA Astrophysics Data System (ADS)

    Vazquez, G. E.; Gaxiola-Camacho, J. R.; Trejo, M.; Echagaray, J.; Guzman, G. M.

    2015-12-01

    Performance assessment of bridges has become very important during recent years. Bridges around the world are aging, leading to the incorporation of efficient, reliable, and economic evaluation procedures. These techniques must assess properly the performance of bridges under several loading conditions in a real manner, representing the physics of the problem. Among several approaches, Global Positioning System (GPS) can be intelligently used for the performance evaluation of bridges. We focused on GPS, since it naturally produces position estimates as compared to seismic instruments that record either velocity or acceleration, and thus require an integration. There are several reasons that make the Juarez Bridge a case of study for evaluation: it is approximately 45 years old, it is a reinforced concrete structure, it connects two significant zones of the city, and its spans is closely to 200 meters long. In addition, thousands of vehicles and pedestrians use the Juarez Bridge every day, which make feasible the GPS performance assessment. Hence, in order to produce optimal position estimates, GPS data were collected during two consecutive hours at three different periods of the day for a whole week (Monday through Sunday), to represent three critical limit states of the bridge (mid-span and end-spans). GPS data were processed using the GAMIT/GLOBK software, considering 1-second sampling rate, 15-degree cutoff angle, ionosphere-free double-differenced (DD) carrier phase method, and precise final orbits disseminated by IGS (International GNSS Service). The displacements obtained from the above discussed procedure are compared with allowable values documented in bridge construction manuals. Reliability theory was used to evaluate the probability of failure of the bridge for the three periods of the day. In addition, a conclusion was made about the most risky day of the week for the use of the Juarez Bridge. It is expected that the results from the proposed research

  12. Field performance of timber bridges. 9, Big Erick`s stress-laminated deck bridge

    Treesearch

    J. A. Kainz; J. P. Wacker; M. Nelson

    The Big Erickas bridge was constructed during September 1992 in Baraga County, Michigan. The bridge is 72 ft long, 16 ft wide, and consists of three simple spans: two stress-laminated deck approach spans and a stress-laminated box center span. The bridge is unique in that it is one of the first known stress-laminated timber bridge applications to use Eastern Hemlock...

  13. Field performance of timber bridges. 5, Little Salmon Creek stress-laminated deck bridge

    Treesearch

    M. A. Ritter; J. A. Kainz; G. J. Porter

    The Little Salmon Creek bridge was constructed in November 1988 on the Allegheny National Forest in Pennsylvania. The bridge is a simple span, single-lane, stress-laminated deck superstructure that is approximately 26-ft long and 16-ft wide. The bridge is unique in that it is the first known stress-laminated timber bridge to be constructed of hardwood lumber. The...

  14. Improving bridge load rating accuracy.

    DOT National Transportation Integrated Search

    2013-06-01

    Nearly one-quarter of Alabamas bridges are deemed structurally deficient or functionally obsolete. An : additional seven percent of Alabamas bridges were posted bridges in 2010. (Federal Highway Administration, : 2011) Accurate bridge load rati...

  15. Hydraulic modeling of flow impact on bridge structures: a case study on Citarum bridge

    NASA Astrophysics Data System (ADS)

    Siregar, R. I.

    2018-02-01

    Flood waves because of the rapid catchment response to high intense rainfall, breaches of flood defenses may induce huge impact forces on structures, causing structural damage or even failures. Overflowing stream that passes over the bridge, it means to discharge flood water level is smaller than the capacity of the river flow. In this study, the researches present the methodological approach of flood modeling on bridge structures. The amount of force that obtained because of the hydrostatic pressure received by the bridge at the time of the flood caused the bridge structure disrupted. This paper presents simulation of flow impact on bridge structures with some event flood conditions. Estimating the hydrostatic pressure developed new model components, to quantify the flow impact on structures. Flow parameters applied the model for analyzing, such as discharge, velocity, and water level or head that effect of bridge structures. The simulation will illustrate the capability of bridge structures with some event flood river and observe the behavior of the flow that occurred during the flood. Hydraulic flood modeling use HEC-RAS for simulation. This modeling will describe the impact on bridge structures. Based on the above modelling resulted, in 2008 has flood effect more than other years on the Citarum Bridge, because its flow overflow on the bridge.

  16. Development of bridge girder movement criteria for accelerated bridge construction.

    DOT National Transportation Integrated Search

    2014-06-01

    End diaphragms connect multiple girders to form a bridge superstructure system for effective resistance to earthquake loads. Concrete : girder bridges that include end diaphragms consistently proved to perform well during previous earthquake events. ...

  17. Diode-quad bridge circuit means

    NASA Technical Reports Server (NTRS)

    Harrison, D. R.; Dimeff, J. (Inventor)

    1975-01-01

    Diode-quad bridge circuit means is described for use as a transducer circuit or as a discriminator circuit. It includes: (1) a diode bridge having first, second, third, and fourth bridge terminals consecutively coupled together by four diodes polarized in circulating relationship; (2) a first impedance connected between the second bridge terminal and a circuit ground; (3) a second impedance connected between the fourth bridge terminal and the circuit ground; (4) a signal source having a first source terminal capacitively coupled to the first and third bridge terminals, and a second source terminal connected to the circuit ground; and (5) an output terminal coupled to the first bridge terminal and at which an output signal may be taken.

  18. 4. VIEW OF SILVER BRIDGE (ST. MARY'S BRIDGE), CARRYING COUNTY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. VIEW OF SILVER BRIDGE (ST. MARY'S BRIDGE), CARRYING COUNTY ROAD OVER SOURIS RIVER NEAR SOUTH END OF REFUGE, LOOKING NORTHEAST - Upper Souris National Wildlife Refuge Dams, Souris River Basin, Foxholm, Surrey (England), ND

  19. Dog Bridge, view of the deck of the bridge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Dog Bridge, view of the deck of the bridge and rails looking from Linden Lane - National Park Seminary, Bounded by Capitol Beltway (I-495), Linden Lane, Woodstove Avenue, & Smith Drive, Silver Spring, Montgomery County, MD

  20. 2. DETAIL OF KLINGLE ROAD BRIDGE AND PATHWAY BRIDGE CROSSINGS. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. DETAIL OF KLINGLE ROAD BRIDGE AND PATHWAY BRIDGE CROSSINGS. AERIAL VIEW OF BEACH DRIVE AT INTERSECTION OF KLINGLE ROAD AND PORTER STREET. VIEW NE. - Rock Creek Park Road System, Washington, District of Columbia, DC

  1. Load ratings for secondary bridges.

    DOT National Transportation Integrated Search

    1991-05-01

    A load rating states the load in tons which a vehicle can impose on a bridge. : Changes in guidelines, standards, and customary uses of bridges require : analyses of bridges to be updated and re-evaluated. : In this report, twenty-two secondary bridg...

  2. Akashi Kaikyo Bridge, Japan

    NASA Image and Video Library

    2013-03-25

    NASA Terra spacecraft shows the Akashi Kaikyo Bridge or Pearl Bridge, the longest central span of any suspension bridge in the world, at 1991 meters, connecting the city of Kobe, Japan with Iwaja on Awaji Island by crossing the busy Akashi Strait.

  3. Morphological aspects of myocardial bridges.

    PubMed

    Lujinović, Almira; Kulenović, Amela; Kapur, Eldan; Gojak, Refet

    2013-11-01

    Although some myocardial bridges can be asymptomatic, their presence often causes coronary disease either through direct compression of the "tunnel" segment or through stimulation and accelerated development of atherosclerosis in the segment proximally to the myocardial bridge. The studied material contained 30 human hearts received from the Department of Anatomy. The hearts were preserved 3 to 5 days in 10% formalin solution. Thereafter, the fatty tissue was removed and arterial blood vessels prepared by careful dissection with special reference to the presence of the myocardial bridges. Length and thickness of the bridges were measured by the precise electronic caliper. The angle between the myocardial bridge fibre axis and other axis of the crossed blood vessel was measured by a goniometer. The presence of the bridges was confirmed in 53.33% of the researched material, most frequently (43.33%) above the anterior interventricular branch. The mean length of the bridges was 14.64 ± 9.03 mm and the mean thickness was 1.23 ± 1.32 mm. Myocardial bridge fibres pass over the descending blood vessel at the angle of 10-90 degrees. The results obtained on a limited sample suggest that the muscular index of myocardial bridge is the highest for bridges located on RIA, but that the difference is not significant in relation to bridges located on other branches. The results obtained suggest that bridges located on other branches, not only those on RIA, could have a great contractive power and, consequently, a great compressive force, which would be exerted on the wall of a crossed blood vessel.

  4. Field performance of timber bridges. 17, Ciphers stress-laminated deck bridge

    Treesearch

    James P. Wacker; James A. Kainz; Michael A. Ritter

    In September 1989, the Ciphers bridge was constructed within the Beltrami Island State Forest in Roseau County, Minnesota. The bridge superstructure is a two-span continuous stress-laminated deck that is approximately 12.19 m long, 5.49 m wide, and 305 mm deep (40 ft long, 18 ft wide, and 12 in. deep). The bridge is one of the first to utilize red pine sawn lumber for...

  5. 6. VIEW OF GDOT BRIDGE NO. 02700268X00678N BRIDGE PLATE IDENTIFYING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF GDOT BRIDGE NO. 027-00268X-00678N BRIDGE PLATE IDENTIFYING COUNTY COMMISSIONERS AT THE TIME OF CONSTRUCTION. - GDOT Bridge No. 027-00268X-00678N, County Road 268-Empress Road span Piscola Creek, Quitman, Brooks County, GA

  6. SSI-bridge : soil bridge interaction during long-duration earthquake motions.

    DOT National Transportation Integrated Search

    2014-09-01

    The seismic response of a complete soil-bridge system during shallow, crustal and subduction zone earthquakes is the topic of this report. Specifically, the effects of earthquake duration on the seismic performance of soil-bridge systems are examined...

  7. 49 CFR 236.312 - Movable bridge, interlocking of signal appliances with bridge devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Movable bridge, interlocking of signal appliances with bridge devices. 236.312 Section 236.312 Transportation Other Regulations Relating to... SYSTEMS, DEVICES, AND APPLIANCES Interlocking Standards § 236.312 Movable bridge, interlocking of signal...

  8. 49 CFR 236.312 - Movable bridge, interlocking of signal appliances with bridge devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Movable bridge, interlocking of signal appliances with bridge devices. 236.312 Section 236.312 Transportation Other Regulations Relating to... SYSTEMS, DEVICES, AND APPLIANCES Interlocking Standards § 236.312 Movable bridge, interlocking of signal...

  9. 76 FR 55160 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  10. 77 FR 53251 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  11. 75 FR 62181 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  12. Comprehensive evaluation of fracture critical bridges.

    DOT National Transportation Integrated Search

    2014-02-01

    Two-girder steel bridges are classified as fracture critical bridges based on the definition given in the AASHTO LRFD Bridge Design Specifications. In a fracture critical bridge a failure of a tension member leads to collapse of the bridge. However, ...

  13. Evaluation of bridge replacement alternatives for the county bridge system.

    DOT National Transportation Integrated Search

    1994-08-01

    Recent reports have indicated that 23.5 percent of the nation's highway bridges are : structurally deficient and 17.7 percent are functionally obsolete. A significant number of these bridges : are on the Iowa county road system. The objective of the ...

  14. Field performance of timber bridges. 16, North Siwell Road stress-laminated bridge

    Treesearch

    J. A. Kainz

    The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single-span, stress-laminated T-beam structure that measures 9.1 m (30 ft) long and 8.7 m (28.5 ft) wide. Performance of the bridge was monitored for 24 months, beginning at the time of installation. Monitoring involved gathering and evaluating data relative...

  15. Field performance of timber bridges. 10, Sanborn Brook stress-laminated deck bridge

    Treesearch

    P. D. Hilbrich Lee; J. P. Wacker; M. A. Ritter

    The Sanborn Brook bridge was constructed in August 1991, 10 miles northeast of Concord, New Hampshire, as part of the demonstration timber bridge program of the USDA Forest Service. The bridge is a simple-span, double-lane, stress-laminated deck superstructure constructed from Southern Pine lumber and is approximately 25 ft long and 28 ft wide with a skew of 14 degrees...

  16. Performance evaluation of bridges with structural bridge deck overlays (SBDO).

    DOT National Transportation Integrated Search

    2006-03-01

    Structural Bridge Deck Overlay (SBDO) involves applying 6 to 10 inches (150 to 200 mm) of normal weight, class AA, reinforced concrete directly to a bridges original slab. The overlay is designed to increase the deck elevation to an extent that st...

  17. Long continuous bridge deck evaluation : John Day River Bridge, Clatsop County, Bridge No. 1827B : final report.

    DOT National Transportation Integrated Search

    1995-06-01

    The John Day River Bridge, near Astoria, Oregon was built with a continuous deck length of 1,105 ft. (340 m). The rationale for designing the John Day River Bridge with an unusually long continuous deck is in part based on the site's very mild climat...

  18. Reconfigurable wireless monitoring systems for bridges: validation on the Yeondae Bridge

    NASA Astrophysics Data System (ADS)

    Kim, Junhee; Lynch, Jerome P.; Zonta, Daniele; Lee, Jong-Jae; Yun, Chung-Bang

    2009-03-01

    The installation of a structural monitoring system on a medium- to large-span bridge can be a challenging undertaking due to high system costs and time consuming installations. However, these historical challenges can be eliminated by using wireless sensors as the primary building block of a structural monitoring system. Wireless sensors are low-cost data acquisition nodes that utilize wireless communication to transfer data from the sensor to the data repository. Another advantageous characteristic of wireless sensors is their ability to be easily removed and reinstalled in another sensor location on the same structure; this installation modularity is highlighted in this study. Wireless sensor nodes designed for structural monitoring applications are installed on the 180 m long Yeondae Bridge (Korea) to measure the dynamic response of the bridge to controlled truck loading. To attain a high nodal density with a small number (20) of wireless sensors, the wireless sensor network is installed three times with each installation concentrating sensors in one portion of the bridge. Using forced and free vibration response data from the three installations, the modal properties of the bridge are accurately identified. Intentional nodal overlapping of the three different sensor installations allows mode shapes from each installation to be stitched together into global mode shapes. Specifically, modal properties of the Yeondae Bridge are derived off-line using frequency domain decomposition (FDD) modal analysis methods.

  19. 33 CFR 115.40 - Bridge repairs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Bridge repairs. 115.40 Section 115.40 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.40 Bridge repairs. Repairs to a bridge which do...

  20. 33 CFR 115.40 - Bridge repairs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Bridge repairs. 115.40 Section 115.40 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.40 Bridge repairs. Repairs to a bridge which do...

  1. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs

    PubMed Central

    Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. PMID:29146667

  2. Wright-Fisher diffusion bridges.

    PubMed

    Griffiths, Robert C; Jenkins, Paul A; Spanò, Dario

    2017-10-06

    The trajectory of the frequency of an allele which begins at x at time 0 and is known to have frequency z at time T can be modelled by the bridge process of the Wright-Fisher diffusion. Bridges when x=z=0 are particularly interesting because they model the trajectory of the frequency of an allele which appears at a time, then is lost by random drift or mutation after a time T. The coalescent genealogy back in time of a population in a neutral Wright-Fisher diffusion process is well understood. In this paper we obtain a new interpretation of the coalescent genealogy of the population in a bridge from a time t∈(0,T). In a bridge with allele frequencies of 0 at times 0 and T the coalescence structure is that the population coalesces in two directions from t to 0 and t to T such that there is just one lineage of the allele under consideration at times 0 and T. The genealogy in Wright-Fisher diffusion bridges with selection is more complex than in the neutral model, but still with the property of the population branching and coalescing in two directions from time t∈(0,T). The density of the frequency of an allele at time t is expressed in a way that shows coalescence in the two directions. A new algorithm for exact simulation of a neutral Wright-Fisher bridge is derived. This follows from knowing the density of the frequency in a bridge and exact simulation from the Wright-Fisher diffusion. The genealogy of the neutral Wright-Fisher bridge is also modelled by branching Pólya urns, extending a representation in a Wright-Fisher diffusion. This is a new very interesting representation that relates Wright-Fisher bridges to classical urn models in a Bayesian setting. Copyright © 2017 Elsevier Inc. All rights reserved.

  3. Extracorporeal Life Support Bridge to Ventricular Assist Device: The Double Bridge Strategy.

    PubMed

    Marasco, Silvana F; Lo, Casey; Murphy, Deirdre; Summerhayes, Robyn; Quayle, Margaret; Zimmet, Adam; Bailey, Michael

    2016-01-01

    In patients requiring left ventricular assist device (LVAD) support, it can be difficult to ascertain suitability for long-term mechanical support with LVAD and eventual transplantation. LVAD implantation in a shocked patient is associated with increased morbidity and mortality. Interest is growing in the utilization of extracorporeal life support (ECLS) as a bridge-to-bridge support for these critically unwell patients. Here, we reviewed our experience with ECLS double bridging. We hypothesized that ECLS double bridging would stabilize end-organ dysfunction and reduce ventricular assist device (VAD) implant perioperative mortality. We conducted a retrospective review of prospectively collected data for 58 consecutive patients implanted with a continuous-flow LVAD between January 2010 and December 2013 at The Alfred Hospital, Melbourne, Victoria, Australia. Twenty-three patients required ECLS support pre-LVAD while 35 patients underwent LVAD implantation without an ECLS bridge. Preoperative morbidity in the ECLS bridge group was reflected by increased postoperative intensive care duration, blood loss, blood product use, and postoperative renal failure, but without negative impact upon survival when compared with the no ECLS group. ECLS stabilization improved end-organ function pre-VAD implant with significant improvements in hepatic and renal dysfunction. This series demonstrates that the use of ECLS bridge to VAD stabilizes end-organ dysfunction and reduces VAD implant perioperative mortality from that traditionally reported in these "crash and burn" patients. Copyright © 2015 International Center for Artificial Organs and Transplantation and Wiley Periodicals, Inc.

  4. Advanced bridge safety initiative : FRP flexural retrofit for concrete slab bridges - task 4 deliverables.

    DOT National Transportation Integrated Search

    2014-06-01

    Concrete slab bridges are being examined as part of the MaineDOT Advanced Bridge Safety Initiative. Under Tasks : 1 3 a finite element analysis program is developed, validated and applied to twenty bridges. : Task 4 investigates and develops a no...

  5. Semiconductor bridge (SCB) detonator

    DOEpatents

    Bickes, Jr., Robert W.; Grubelich, Mark C.

    1999-01-01

    The present invention is a low-energy detonator for high-density secondary-explosive materials initiated by a semiconductor bridge igniter that comprises a pair of electrically conductive lands connected by a semiconductor bridge. The semiconductor bridge is in operational or direct contact with the explosive material, whereby current flowing through the semiconductor bridge causes initiation of the explosive material. Header wires connected to the electrically-conductive lands and electrical feed-throughs of the header posts of explosive devices, are substantially coaxial to the direction of current flow through the SCB, i.e., substantially coaxial to the SCB length.

  6. Semiconductor bridge (SCB) detonator

    DOEpatents

    Bickes, R.W. Jr.; Grubelich, M.C.

    1999-01-19

    The present invention is a low-energy detonator for high-density secondary-explosive materials initiated by a semiconductor bridge (SCB) igniter that comprises a pair of electrically conductive lands connected by a semiconductor bridge. The semiconductor bridge is in operational or direct contact with the explosive material, whereby current flowing through the semiconductor bridge causes initiation of the explosive material. Header wires connected to the electrically-conductive lands and electrical feed-throughs of the header posts of explosive devices, are substantially coaxial to the direction of current flow through the SCB, i.e., substantially coaxial to the SCB length. 3 figs.

  7. Bridge maintenance to enhance corrosion resistance and performance of steel girder bridges

    NASA Astrophysics Data System (ADS)

    Moran Yanez, Luis M.

    The integrity and efficiency of any national highway system relies on the condition of the various components. Bridges are fundamental elements of a highway system, representing an important investment and a strategic link that facilitates the transport of persons and goods. The cost to rehabilitate or replace a highway bridge represents an important expenditure to the owner, who needs to evaluate the correct time to assume that cost. Among the several factors that affect the condition of steel highway bridges, corrosion is identified as the main problem. In the USA corrosion is the primary cause of structurally deficient steel bridges. The benefit of regular high-pressure superstructure washing and spot painting were evaluated as effective maintenance activities to reduce the corrosion process. The effectiveness of steel girder washing was assessed by developing models of corrosion deterioration of composite steel girders and analyzing steel coupons at the laboratory under atmospheric corrosion for two alternatives: when high-pressure washing was performed and when washing was not considered. The effectiveness of spot painting was assessed by analyzing the corrosion on steel coupons, with small damages, unprotected and protected by spot painting. A parametric analysis of corroded steel girder bridges was considered. The emphasis was focused on the parametric analyses of corroded steel girder bridges under two alternatives: (a) when steel bridge girder washing is performed according to a particular frequency, and (b) when no bridge washing is performed to the girders. The reduction of structural capacity was observed for both alternatives along the structure service life, estimated at 100 years. An economic analysis, using the Life-Cycle Cost Analysis method, demonstrated that it is more cost-effective to perform steel girder washing as a scheduled maintenance activity in contrast to the no washing alternative.

  8. Bridge Workshop : Enhancing Bridge Performance, February 21-22, 2008, Reston, Virginia : workshop report

    Treesearch

    Sreenivas Alampalli; Sheila Rimal Duwadi; Reagan Sentelle Herman; Danielle D. Kleinhans; Khaled Mahmoud; James C. Ray; James P. Wacker; Nur Yazdani

    2008-01-01

    The participants to the workshop were given the charge to discuss (1) bridge design issues including best practices in design and detailing that could be used to improve durability, extend service life and prevent premature deterioration, (2) performance measures needed to better determine bridge condition, (3) technologies that could be used to monitor bridge life and...

  9. Field performance of timber bridges. 15, Pueblo County, Colorado, stress-laminated deck bridge

    Treesearch

    L. E. Hislop

    The Pueblo County 204B bridge was constructed in March 1990 in Pueblo, Colorado, as a demonstration bridge under the USDA Forest Service Timber Bridge Initiative. The stress-laminated deck superstructure is approximately 10 m long, 9 m wide, and 406 mm deep, with a skew of 10 degrees. Performance monitoring was conducted for 3 years, beginning at...

  10. Seismic testing of precast segmental bridges, Phase III : bridge system test.

    DOT National Transportation Integrated Search

    2005-06-01

    This report discusses the main findings of a test examining the seismic behavior of a precast, post-tensioned, segmental bridge : superstructure with a cast-in-place, hollow, rectangular column. The half-scale specimen modeled a prototype bridge from...

  11. Bridge deck deicing

    DOT National Transportation Integrated Search

    1998-01-01

    Concrete bridge decks are prone to ice accumulation. The use of road salts and chemicals for deicing is cost effective but causes damage to concrete and corrosion of reinforcing steel in concrete bridge decks. This problem is a major concern to trans...

  12. Removal of failed crown and bridge

    PubMed Central

    Rahul, G R.; Poduval, Soorya T.; Shetty, Karunakar

    2012-01-01

    Crown and bridge have life span of many years but they fail for a number of reasons. Over the years, many devices have been designed to remove crowns and bridges from abutment teeth. While the removal of temporary crowns and bridges is usually very straightforward, the removal of a definitive cast crown with unknown cement is more challenging. Removal is often by destructive means. There are a number of circumstances, however, in which conservative disassembly would aid the practitioner in completing restorative/endodontic procedures. There are different mechanisms available to remove a failed crown or bridge. But there is no information published about the classification of available systems for crown and bridge removal. So it is logical to classify these systems into different groups which can help a clinician in choosing a particular type of system depending upon the clinical situation. The aim of this article is to provide a classification for various crown and bridge removal systems; describe how a number of systems work; and when and why they might be used. A PubMed search of English literature was conducted up to January 2010 using the terms: Crown and bridge removal, Crown and bridge disassembly, Crown and bridge failure. Additionally, the bibliographies of 3 previous reviews, their cross references as well as articles published in various journals like International Endodontic Journal, Journal of Endodontics and were manually searched. Key words:Crown and bridge removal, Crown and bridge disassembly, Crown and bridge failure. PMID:24558549

  13. 49 CFR 237.109 - Bridge inspection records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge inspection records. 237.109 Section 237.109..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.109 Bridge inspection records... performed on those bridges under this part. (b) Each record of an inspection under the bridge management...

  14. 49 CFR 237.109 - Bridge inspection records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge inspection records. 237.109 Section 237.109..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.109 Bridge inspection records... performed on those bridges under this part. (b) Each record of an inspection under the bridge management...

  15. Load rating of complex bridges.

    DOT National Transportation Integrated Search

    2010-07-01

    The National Bridge Inspection Standards require highway departments to inspect, evaluate, and determine load ratings for : structures defined as bridges located on all public roads. Load rating of bridges is performed to determine the live load that...

  16. Field performance of timber bridges. 8, Lynches Woods Park stress-laminated deck bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; D. Conger

    The Lynches Woods Park bridge was constructed during the summer of 1990 in Newberry, South Carolina. It is a single-span, single-lane, stress-laminated deck superstructure that measures approximately 30 ft long, 16 ft wide, and 14 in. deep. The bridge is unique in that is one of the first known stress-laminated deck bridges to be constructed of Southern Pine lumber...

  17. Salt-Bridge Energetics in Halophilic Proteins

    PubMed Central

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K.

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are −3.0 kcal mol−1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of −5.0 kcal mol−1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (−10 kcal mol−1) exceeds than that of bridge term (−7 kcal mol−1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic

  18. Salt-bridge energetics in halophilic proteins.

    PubMed

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are -3.0 kcal mol-1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of -5.0 kcal mol-1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (-10 kcal mol-1) exceeds than that of bridge term (-7 kcal mol-1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic signature in its

  19. Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; S. C. Catherman; R. G. Winnett

    In January 1992, the Christian Hollow bridge was constructed in Steuben County, New York. The bridge is a single-span, stress-laminated box-beam superstructure that is 9.1 m long, 9.8 m wide, and 502 mm deep (30 ft long, 32 ft wide, and 19-3/4 in. deep). The performance of the bridge was continuously monitored for 28 months, beginning shortly after installation....

  20. Field performance of timber bridges. 14, Dean, Hibbsville, and Decatur stress-laminated deck bridges

    Treesearch

    P. D. Hilbrich Lee; M. A. Ritter; S. Golston; K. Hinds

    1984-01-01

    The Dean, Hibbsville, and Decatur bridges were constructed in southern Iowa during 1994. Each bridge is a simple-span, stress-laminated deck superstructure, approximately 7.3 m (24 ft) long, constructed from eastern cottonwood lumber. The performance of each bridge was monitored for approximately 2 years, beginning shortly after installation. Monitoring involved...

  1. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, evaluation of a precast concrete bridge, Madison County bridge.

    DOT National Transportation Integrated Search

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed ...

  2. Two test level 4 bridge railing and transition systems for transverse timber deck bridges

    Treesearch

    Ronald K. Faller; Michael A. Ritter; Barry T. Rosson; Michael D. Fowler; Sheila R. Duwadi

    2000-01-01

    The Midwest Roadside Safety Facility, in cooperation with the Forest Products Laboratory, which is part of the U.S. Department of Agricultureas Forest Service, and FHWA, designed two bridge railing and approach guardrail transition systems for use on bridges with transverse glue-laminated timber decks. The bridge raging and transition systems were developed and crash...

  3. Geotextile reinforced bridge approach embankment : Lake River Bridge : Malin Highway , Klamath County, Oregon : construction report.

    DOT National Transportation Integrated Search

    1993-03-01

    The transition from the roadway to the deck of a rigidly supported bridge is of concern to engineers and the travelling public. It is a common occurrence to feel a discontinuity between the roadway and bridge structure. Bridge engineers have tried to...

  4. 49 CFR 237.103 - Bridge inspection procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge inspection procedures. 237.103 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.103 Bridge inspection procedures. (a) Each bridge management program shall specify the procedure to be used for...

  5. Temperature differential of swingspan bridges : final report.

    DOT National Transportation Integrated Search

    1969-06-01

    This report describes a study performed to determine the temperature differential of the top and bottom member of one side of a swingspan bridge. Three bridges were used in the study. Bridge No. 1 was an equal-arm swingspan bridge, Bridge No. 2 was a...

  6. 49 CFR 237.103 - Bridge inspection procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge inspection procedures. 237.103 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.103 Bridge inspection procedures. (a) Each bridge management program shall specify the procedure to be used for...

  7. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs.

    PubMed

    Ashley, Michael; Cooper, Katelyn M; Cala, Jacqueline M; Brownell, Sara E

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. © 2017 M. Ashley, K. M. Cooper, et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  8. 23 CFR 650.307 - Bridge inspection organization.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Bridge inspection organization. 650.307 Section 650.307... BRIDGES, STRUCTURES, AND HYDRAULICS National Bridge Inspection Standards § 650.307 Bridge inspection... bridges located on public roads that are fully or partially located within the State's boundaries, except...

  9. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...

  10. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...

  11. Coupling vibration research on Vehicle-bridge system

    NASA Astrophysics Data System (ADS)

    Zhou, Jiguo; Wang, Guihua

    2018-01-01

    The vehicle-bridge coupling system forms when vehicle running on a bridge. It will generate a relatively large influence on the driving comfort and driving safe when the vibration of the vehicle is bigger. A three-dimensional vehicle-bridge system with biaxial seven degrees of freedom has been establish in this paper based on finite numerical simulation. Adopting the finite element transient numerical simulation to realize the numerical simulation of vehicle-bridge system coupling vibration. Then, analyze the dynamic response of vehicle and bridge while different numbers of vehicles running on the bridge. Got the variation rule of vertical vibration of car body and bridge, and that of the contact force between the wheel and bridge deck. The research results have a reference value for the analysis about the vehicle running on a large-span cabled bridge.

  12. Salt bridges: geometrically specific, designable interactions.

    PubMed

    Donald, Jason E; Kulp, Daniel W; DeGrado, William F

    2011-03-01

    Salt bridges occur frequently in proteins, providing conformational specificity and contributing to molecular recognition and catalysis. We present a comprehensive analysis of these interactions in protein structures by surveying a large database of protein structures. Salt bridges between Asp or Glu and His, Arg, or Lys display extremely well-defined geometric preferences. Several previously observed preferences are confirmed, and others that were previously unrecognized are discovered. Salt bridges are explored for their preferences for different separations in sequence and in space, geometric preferences within proteins and at protein-protein interfaces, co-operativity in networked salt bridges, inclusion within metal-binding sites, preference for acidic electrons, apparent conformational side chain entropy reduction on formation, and degree of burial. Salt bridges occur far more frequently between residues at close than distant sequence separations, but, at close distances, there remain strong preferences for salt bridges at specific separations. Specific types of complex salt bridges, involving three or more members, are also discovered. As we observe a strong relationship between the propensity to form a salt bridge and the placement of salt-bridging residues in protein sequences, we discuss the role that salt bridges might play in kinetically influencing protein folding and thermodynamically stabilizing the native conformation. We also develop a quantitative method to select appropriate crystal structure resolution and B-factor cutoffs. Detailed knowledge of these geometric and sequence dependences should aid de novo design and prediction algorithms. Copyright © 2010 Wiley-Liss, Inc.

  13. Active-bridge oscillator

    DOEpatents

    Wessendorf, Kurt O.

    2001-01-01

    An active bridge oscillator is formed from a differential amplifier where positive feedback is a function of the impedance of one of the gain elements and a relatively low value common emitter resistance. This use of the nonlinear transistor parameter h stabilizes the output and eliminates the need for ALC circuits common to other bridge oscillators.

  14. Bridging a cultural gap

    NASA Astrophysics Data System (ADS)

    Leviatan, Talma

    2008-09-01

    There has been a broad wave of change in tertiary calculus courses in the past decade. However, the much-needed change in tertiary pre-calculus programmes—aimed at bridging the gap between high-school mathematics and tertiary mathematics—is happening at a far slower pace. Following a discussion on the nature of the gap and the objectives of a potential bridging programme, this paper aims at demonstrating that the gap can be bridged, by presenting an ongoing modular bridging programme especially designed for the diverse types of student populations in teachers training colleges. We also present here some innovative teaching and assessment methods that were judged essential for the success of these programmes—focusing mainly on the "Questionnaire Based Instruction Method". Finally we suggest directions of follow up and research.

  15. Bridge inspector's manual for movable bridges.

    DOT National Transportation Integrated Search

    1977-01-01

    Importance of Inspection-Movable bridges are built to the rigid specifications : of such groups as the American Association of State Highway and : Transportation Officials (AASHTO), the American Road Builders Association : (ARBA) and Underwriters Lab...

  16. Movable bridge maintenance monitoring.

    DOT National Transportation Integrated Search

    2013-10-01

    Movable bridges have particular maintenance issues, which cost considerably more than those of fixed bridges, : mostly because of the complex interaction of the mechanical, electrical and structural components. In order to track : maintenance and ope...

  17. Characterization of stormwater runoff from bridges in North Carolina and the effects of bridge runoff on receiving streams

    USGS Publications Warehouse

    Wagner, Chad; Fitzgerald, Sharon; Lauffer, Matthew

    2015-01-01

    The presentation will provide an overview of a collaborative study between USGS, NC Department of Transportation and URS Corporation to characterize stormwater runoff from bridges in North Carolina and the effects of bridge runoff on receiving streams. This investigation measured bridge deck runoff from 15 bridges for 12-15 storms, stream water-quality data for baseflow and storm conditions at four of the bridge deck sites and streambed sediment chemistry upstream and downstream of 30 bridges across North Carolina. Background on why the study was conducted, objectives and scope and a general summary of the major results and conclusions will be presented.

  18. Bridge element deterioration rates.

    DOT National Transportation Integrated Search

    2008-10-01

    This report describes the development of bridge element deterioration rates using the NYSDOT : bridge inspection database using Markov chains and Weibull-based approaches. It is observed : that Weibull-based approach is more reliable for developing b...

  19. Bridge deck wearing surfaces.

    DOT National Transportation Integrated Search

    2010-11-01

    Several commercially available bridge deck overlay systems claim to be waterproof and reduce deterioration caused by chloride laden water from penetrating concrete bridge decks. An attempt was made to quantify the in-service waterproofing qualities o...

  20. Bridge-Vehicle Impact Assessment

    DOT National Transportation Integrated Search

    2011-08-01

    Bridges in New York State have been experiencing close to 200 bridge hits a year. These : accidents are attributed to numerous factors including: improperly stored equipment on trucks; : violation of vehicle posting signs; illegal commercial vehicles...

  1. Bridge vehicle impact assessment.

    DOT National Transportation Integrated Search

    2011-12-01

    Bridges in New York State have been experiencing close to 200 bridge hits a year. These : accidents are attributed to numerous factors including: improperly stored equipment on trucks; : violation of vehicle posting signs; illegal commercial vehicles...

  2. Wireless Smart Sensor Network System Using SmartBridge Sensor Nodes for Structural Health Monitoring of Existing Concrete Bridges

    NASA Astrophysics Data System (ADS)

    Gaviña, J. R.; Uy, F. A.; Carreon, J. D.

    2017-06-01

    There are over 8000 bridges in the Philippines today according to the Department of Public Works and Highways (DPWH). Currently, visual inspection is the most common practice in monitoring the structural integrity of bridges. However, visual inspections have proven to be insufficient in determining the actual health or condition of a bridge. Structural Health Monitoring (SHM) aims to give, in real-time, a diagnosis of the actual condition of the bridge. In this study, SmartBridge Sensor Nodes were installed on an existing concrete bridge with American Association of State Highway and Transportation Officials (AASHTO) Type IV Girders to gather vibration of the elements of the bridge. Also, standards on the effective installation of SmartBridge Sensor Nodes, such as location and orientation was determined. Acceleration readings from the sensor were then uploaded to a server, wherein they are monitored against certain thresholds, from which, the health of the bridge will be derived. Final output will be a portal or webpage wherein the information, health, and acceleration readings of the bridge will be available for viewing. With levels of access set for different types of users, the main users will have access to download data and reports. Data transmission and webpage access are available online, making the SHM system wireless.

  3. Akashi-Kaikyo Bridge, Japan

    NASA Image and Video Library

    2015-08-10

    The Akashi Kaikyo Bridge in Japan has the longest central span of any suspension bridge in the world at 1991 m. The total length of the bridge is 3911 m. It links the city of Kobe on the mainland of Honshu to Iwaya on Awaji Island, crossing the busy Akashi Strait. The image was acquired April 26, 2014, covers an area of 8.1 by 11.2 km, and is located at 34.6 degrees north, 135 degrees east. http://photojournal.jpl.nasa.gov/catalog/PIA19747

  4. BUILDING A BETTER GLUTEAL BRIDGE: ELECTROMYOGRAPHIC ANALYSIS OF HIP MUSCLE ACTIVITY DURING MODIFIED SINGLE-LEG BRIDGES.

    PubMed

    Lehecka, B J; Edwards, Michael; Haverkamp, Ryan; Martin, Lani; Porter, Kambry; Thach, Kailey; Sack, Richard J; Hakansson, Nils A

    2017-08-01

    Gluteal strength plays a role in injury prevention, normal gait patterns, eliminating pain, and enhancing athletic performance. Research shows high gluteal muscle activity during a single-leg bridge compared to other gluteal strengthening exercises; however, prior studies have primarily measured muscle activity with the active lower extremity starting in 90 ° of knee flexion with an extended contralateral knee. This standard position has caused reports of hamstring cramping, which may impede optimal gluteal strengthening. The purpose of this study was to determine which modified position for the single-leg bridge is best for preferentially activating the gluteus maximus and medius. Cross-Sectional. Twenty-eight healthy males and females aged 18-30 years were tested in five different, randomized single-leg bridge positions. Electromyography (EMG) electrodes were placed on subjects' gluteus maximus, gluteus medius, rectus femoris, and biceps femoris of their bridge leg (i.e., dominant or kicking leg), as well as the rectus femoris of their contralateral leg. Subjects performed a maximal voluntary isometric contraction (MVIC) for each tested muscle prior to performing five different bridge positions in randomized order. All bridge EMG data were normalized to the corresponding muscle MVIC data. A modified bridge position with the knee of the bridge leg flexed to 135 ° versus the traditional 90 ° of knee flexion demonstrated preferential activation of the gluteus maximus and gluteus medius compared to the traditional single-leg bridge. Hamstring activation significantly decreased (p < 0.05) when the dominant knee was flexed to 135 ° (23.49% MVIC) versus the traditional 90 ° (75.34% MVIC), while gluteal activation remained similarly high (51.01% and 57.81% MVIC in the traditional position, versus 47.35% and 57.23% MVIC in the modified position for the gluteus maximus and medius, respectively). Modifying the traditional single-leg bridge by flexing the

  5. 23 CFR 650.409 - Evaluation of bridge inventory.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Evaluation of bridge inventory. 650.409 Section 650.409... BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.409 Evaluation of bridge inventory. (a) Sufficiency rating of bridges. Upon receipt and evaluation of the bridge...

  6. 23 CFR 650.409 - Evaluation of bridge inventory.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Evaluation of bridge inventory. 650.409 Section 650.409... BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.409 Evaluation of bridge inventory. (a) Sufficiency rating of bridges. Upon receipt and evaluation of the bridge...

  7. Developing deterioration models for Nebraska bridges.

    DOT National Transportation Integrated Search

    2011-07-01

    Nebraska Bridge Management System (NBMS) was developed in 1999 to assist in optimizing budget allocation for : the maintenance, rehabilitation and replacement needs of highway bridges. This requires the prediction of bridge : deterioration to calcula...

  8. Movable bridge maintenance monitoring : [technical summary].

    DOT National Transportation Integrated Search

    2013-10-01

    Maintenance costs for movable bridges are considerably higher than for fixed bridges, mostly because of the complex interaction of mechanical, electrical, and structural components. Malfunction of any component can cause unexpected failure of bridge ...

  9. LTBP bridge performance primer.

    DOT National Transportation Integrated Search

    2013-12-01

    "The performance of bridges is critical to the overall performance of the highway transportation system in the United States. However, many critical aspects of bridge performance are not well understood. The reasons for this include the extreme diver...

  10. Newport Pell Bridge traffic and revenue study

    DOT National Transportation Integrated Search

    2010-01-12

    Jacobs Engineering conducted a traffic and toll revenue study for the Claiborne Pell Newport Bridge : (Newport Pell Bridge or Pell Bridge) upon the request of the Rhode Island Turnpike and Bridge : Authority (RITBA). This study is being c...

  11. 33 CFR 115.70 - Advance approval of bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Advance approval of bridges. 115... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.70 Advance approval of bridges. (a) The General Bridge Act of 1946 requires the approval of the location and plans of bridges prior...

  12. 33 CFR 115.70 - Advance approval of bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Advance approval of bridges. 115... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.70 Advance approval of bridges. (a) The General Bridge Act of 1946 requires the approval of the location and plans of bridges prior...

  13. Temporary bridge deck panels.

    DOT National Transportation Integrated Search

    2009-03-01

    The research described here has resulted in the development of a simplistic and innovative interlocking : glulam bridge deck panel for use in temporary bridge deck applications. The key feature of this panel : system is the interlocking tongue and gr...

  14. Bridge Scour Technology Transfer

    DOT National Transportation Integrated Search

    2018-01-24

    Scour and flooding are the leading causes of bridge failures in the United States and therefore should be monitored. New applications of tools and technologies are being developed, tested, and implemented to reduce bridge scour risk. The National Coo...

  15. Chesapeake City Bridge. Bridge Inspection Report Number 11B.

    DTIC Science & Technology

    1979-12-01

    recommendations for th 1979 inspection of the Chesapeake City Bridge (Route designation , U.S. Route 213) which crosses the Chesappake and Delaware Canal...Los Arg4 .PASN4 . Mrkee. g14neaoos. Nevr,,r DE . Now York Oemnfto, overland PWn KS. Fh ~M% S0.mo- Tamp, TW=. F wia AMot ho d Jl 4O T, - kv Col. James G...1979 inspection of the Chesapeake City Bridge (Route designation , U.S. Route 213) which crosses the Chesapeake and Delaware Canal was undertaken for the

  16. Development of a sustainable UHPC bridge deck for movable bridges : [research project capsule].

    DOT National Transportation Integrated Search

    2015-11-01

    Louisiana has approximately 160 movable bridges, mostly in the southern part of the state, which : places Louisiana among states with the highest inventory of movable bridges in the nation. These : transportation arteries are important for the econom...

  17. 49 CFR 236.766 - Locking, movable bridge.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Locking, movable bridge. 236.766 Section 236.766... Locking, movable bridge. The rail locks, bridge locks, bolt locks, circuit controllers, and electric locks used in providing interlocking protection at a movable bridge. ...

  18. 49 CFR 236.766 - Locking, movable bridge.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Locking, movable bridge. 236.766 Section 236.766... Locking, movable bridge. The rail locks, bridge locks, bolt locks, circuit controllers, and electric locks used in providing interlocking protection at a movable bridge. ...

  19. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction : research brief

    DOT National Transportation Integrated Search

    2017-09-01

    This study is to develop simulation methodology to conduct the dynamic assessment of bridge deck performance subjected to traffic. Concrete bridge decks are exposed to daily traffic loads and may experience some surface cracking caused by excessive s...

  20. Development of a precast bridge deck overhang system for the rock creek bridge.

    DOT National Transportation Integrated Search

    2008-12-01

    Precast, prestressed panels are commonly used at interior beams for bridges in Texas. The use of these : panels provides ease of construction, sufficient capacity, and good economy for the construction of : bridges in Texas. Current practice for the ...

  1. Evaluation of a highway bridge constructed using high strength lightweight concrete bridge girders.

    DOT National Transportation Integrated Search

    2011-04-01

    The purpose of this research was to characterize the performance of High Strength Lightweight Concrete (HSLW) in precast, prestressed bridge girders and to evaluate their performance in a highway bridge. The mechanical properties and long-term time-d...

  2. Bridging: Locating Critical Connectors in a Network

    PubMed Central

    Valente, Thomas W.; Fujimoto, Kayo

    2010-01-01

    This paper proposes several measures for bridging in networks derived from Granovetter's (1973) insight that links which reduce distances in a network are important structural bridges. Bridging is calculated by systematically deleting links and calculating the resultant changes in network cohesion (measured as the inverse average path length). The average change for each node's links provides an individual level measure of bridging. We also present a normalized version which controls for network size and a network level bridging index. Bridging properties are demonstrated on hypothetical networks, empirical networks, and a set of 100 randomly generated networks to show how the bridging measure correlates with existing network measures such as degree, personal network density, constraint, closeness centrality, betweenness centrality, and vitality. Bridging and the accompanying methodology provide a family of new network measures useful for studying network structure, network dynamics, and network effects on substantive behavioral phenomenon. PMID:20582157

  3. Field performance of timber bridges. 13, Mohawk Canal stress-laminated bridge

    Treesearch

    P. D. Hilbrich Lee; X. Lauderdale

    The Mohawk Canal bridge was constructed in August 1994, just outside Roll, Arizona. It is a simple-span, double-lane, stress-laminated deck superstructure, approximately 6.4 m (21 ft) long and 10.4 m (34 ft) wide and constructed with Combination 16F-V3 Douglas Fir glued-laminated timber beam laminations. The performance of the bridge was monitored continuously for 2...

  4. Development of inspection robots for bridge cables.

    PubMed

    Yun, Hae-Bum; Kim, Se-Hoon; Wu, Liuliu; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  5. Spread prestressed concrete slab beam bridges.

    DOT National Transportation Integrated Search

    2015-04-01

    TxDOT uses prestressed slab beam bridges for short-span bridges ranging from approximately 3050 ft in : length. These bridges have precast, pretensioned slab beams placed immediately adjacent to one another : with a cast-in-place slab made composi...

  6. Lean Construction Applications for Bridge Inspection

    DOT National Transportation Integrated Search

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  7. 77 FR 16784 - General Bridge Regulation; Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ...] RIN 1625-AB36 General Bridge Regulation; Amendment AGENCY: Coast Guard, DHS. ACTION: Proposed rule... bridge regulations. The rulemaking was initiated to clarify the statutory responsibilities of bridge owners to remove their bridges from navigable waterways when they are no longer being used for land...

  8. Hydrodynamic forces on inundated bridge decks

    DOT National Transportation Integrated Search

    2009-05-01

    The hydrodynamic forces experienced by an inundated bridge deck have great importance in the design of bridges. Specifically, the drag force, lift force, and the moment acting on the bridge deck under various levels of inundation and a range of flow ...

  9. Hydraulic forces on submerged bridge decks.

    DOT National Transportation Integrated Search

    2008-09-01

    Bridge decks can be subjected to large horizontal forces when overtopping occurs. These forces may result in the displacement of bridge decks from the bents. This paper reports on the results of a laboratory study of horizontal forces on bridge decks...

  10. Development of Inspection Robots for Bridge Cables

    PubMed Central

    Kim, Se-Hoon; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented. PMID:24459453

  11. 49 CFR 237.55 - Railroad bridge supervisors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge supervisors. 237.55 Section 237.55..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.55 Railroad bridge supervisors. A railroad bridge supervisor shall be a person, regardless of...

  12. 23 CFR 650.307 - Bridge inspection organization.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... bridges located on public roads that are fully or partially located within the State's boundaries, except... inspected, all highway bridges located on public roads that are fully or partially located within the... preparation and maintenance of a bridge inventory. (2) Bridge inspections, reports, load ratings and other...

  13. 49 CFR 237.55 - Railroad bridge supervisors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge supervisors. 237.55 Section 237.55..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.55 Railroad bridge supervisors. A railroad bridge supervisor shall be a person, regardless of...

  14. The South Carolina bridge-scour envelope curves

    USGS Publications Warehouse

    Benedict, Stephen T.; Feaster, Toby D.; Caldwell, Andral W.

    2016-09-30

    The U.S. Geological Survey, in cooperation with the South Carolina Department of Transportation, conducted a series of three field investigations to evaluate historical, riverine bridge scour in the Piedmont and Coastal Plain regions of South Carolina. These investigations included data collected at 231 riverine bridges, which lead to the development of bridge-scour envelope curves for clear-water and live-bed components of scour. The application and limitations of the South Carolina bridge-scour envelope curves were documented in four reports, each report addressing selected components of bridge scour. The current investigation (2016) synthesizes the findings of these previous reports into a guidance manual providing an integrated procedure for applying the envelope curves. Additionally, the investigation provides limited verification for selected bridge-scour envelope curves by comparing them to field data collected outside of South Carolina from previously published sources. Although the bridge-scour envelope curves have limitations, they are useful supplementary tools for assessing the potential for scour at riverine bridges in South Carolina.

  15. Stabilization of electrically conducting capillary bridges using feedback control of radial electrostatic stresses and the shapes of extended bridges

    NASA Astrophysics Data System (ADS)

    Marr-Lyon, Mark J.; Thiessen, David B.; Blonigen, Florian J.; Marston, Philip L.

    2000-05-01

    Electrically conducting, cylindrical liquid bridges in a density-matched, electrically insulating bath were stabilized beyond the Rayleigh-Plateau (RP) limit using electrostatic stresses applied by concentric ring electrodes. A circular liquid cylinder of length L and radius R in real or simulated zero gravity becomes unstable when the slenderness S=L/2R exceeds π. The initial instability involves the growth of the so-called (2, 0) mode of the bridge in which one side becomes thin and the other side rotund. A mode-sensing optical system detects the growth of the (2, 0) mode and an analog feedback system applies the appropriate voltages to a pair of concentric ring electrodes positioned near the ends of the bridge in order to counter the growth of the (2, 0) mode and prevent breakup of the bridge. The conducting bridge is formed between metal disks which are grounded. Three feedback algorithms were tested and each found capable of stabilizing a bridge well beyond the RP limit. All three algorithms stabilized bridges having S as great as 4.3 and the extended bridges broke immediately when feedback was terminated. One algorithm was suitable for stabilization approaching S=4.493… where the (3, 0) mode is predicted to become unstable for cylindrical bridges. For that algorithm the equilibrium shapes of bridges that were slightly under or over inflated corresponded to solutions of the Young-Laplace equation with negligible electrostatic stresses. The electrical conductivity of the bridge liquid need not be large. The conductivity was associated with salt added to the aqueous bridge liquid.

  16. 33 CFR 118.140 - Painting bridge piers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Painting bridge piers. 118.140 Section 118.140 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.140 Painting bridge piers. The District Commander may require...

  17. 49 CFR 237.53 - Railroad bridge inspectors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge inspectors. 237.53 Section 237.53..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.53 Railroad bridge inspectors. A railroad bridge inspector shall be a person who is determined by...

  18. 33 CFR 118.140 - Painting bridge piers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Painting bridge piers. 118.140 Section 118.140 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.140 Painting bridge piers. The District Commander may require...

  19. 49 CFR 237.53 - Railroad bridge inspectors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge inspectors. 237.53 Section 237.53..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.53 Railroad bridge inspectors. A railroad bridge inspector shall be a person who is determined by...

  20. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Application. An application for authorization to construct a bridge across navigable waters of...

  1. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...

  2. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...

  3. Bridge scour monitoring technologies : development of evaluation and selection protocols for application on river bridges in Minnesota.

    DOT National Transportation Integrated Search

    2010-03-01

    Bridge failure or loss of structural integrity can result from scour of riverbed sediment near bridge abutments or : piers during high-flow events in rivers. In the past 20 years, several methods of monitoring bridge scour have been : developed spann...

  4. Simplified bridge load rating methodology using the national bridge inventory file : user manual

    DOT National Transportation Integrated Search

    1988-08-01

    The purpose of this research was to develop a computerized system to determine the adequacy of a bridge or group of bridges to carry specified overload vehicles. The system utilizes two levels of analysis. The Level 1 analysis is the basic rating sys...

  5. Simplified bridge load rating methodology using the national bridge inventory file : program listing

    DOT National Transportation Integrated Search

    1987-08-01

    The purpose of this research was to develop a computerized system to determine the adequacy of a bridge or group of bridges to carry specified overload vehicles. The system utilizes two levels of analysis. The Level 1 analysis is the basic rating sys...

  6. Bridge deficiency metric refinement : longer-term planning for state and locally-owned bridges.

    DOT National Transportation Integrated Search

    2010-06-01

    The focus of this study was to devise a prioritization scheme for locally-owned bridges and to extend the planning time horizon for state-owned bridges. The inherent nature of the local and county structures prevents a direct application of the formu...

  7. 49 CFR 236.713 - Bridge, movable.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge, movable. 236.713 Section 236.713 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Bridge, movable. That section of a structure bridging a navigable waterway so designed that it may be...

  8. 49 CFR 236.713 - Bridge, movable.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge, movable. 236.713 Section 236.713 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Bridge, movable. That section of a structure bridging a navigable waterway so designed that it may be...

  9. 33 CFR 118.90 - Bridges crossing channel obliquely.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Bridges crossing channel obliquely. 118.90 Section 118.90 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.90 Bridges crossing channel obliquely. Bridges...

  10. 49 CFR 237.107 - Conduct of bridge inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Conduct of bridge inspections. 237.107 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.107 Conduct of bridge inspections. Bridge inspections shall be conducted under the direct supervision of a designated...

  11. 33 CFR 118.90 - Bridges crossing channel obliquely.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Bridges crossing channel obliquely. 118.90 Section 118.90 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.90 Bridges crossing channel obliquely. Bridges...

  12. 49 CFR 237.107 - Conduct of bridge inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Conduct of bridge inspections. 237.107 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.107 Conduct of bridge inspections. Bridge inspections shall be conducted under the direct supervision of a designated...

  13. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Approval of plans. An application for authorization to construct a bridge across navigable waters...

  14. Bridge deck fogging system : evaluation of field implementation of a fogging system used during bridge deck construction.

    DOT National Transportation Integrated Search

    2008-01-01

    The objective of this research was to implement and evaluate a fogging system used to provide initial cure for a concrete bridge deck construction project. To accomplish this, Bridges 5500 and 5701 along NM26 were selected. Bridge 5500 was placed usi...

  15. 33 CFR 165.1187 - Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. 165.1187 Section 165.1187... Limited Access Areas Eleventh Coast Guard District § 165.1187 Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. (a) Location. All waters extending...

  16. 33 CFR 165.1187 - Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. 165.1187 Section 165.1187... Limited Access Areas Eleventh Coast Guard District § 165.1187 Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. (a) Location. All waters extending...

  17. Reliability Modeling of Double Beam Bridge Crane

    NASA Astrophysics Data System (ADS)

    Han, Zhu; Tong, Yifei; Luan, Jiahui; Xiangdong, Li

    2018-05-01

    This paper briefly described the structure of double beam bridge crane and the basic parameters of double beam bridge crane are defined. According to the structure and system division of double beam bridge crane, the reliability architecture of double beam bridge crane system is proposed, and the reliability mathematical model is constructed.

  18. LIGHT BRIDGE IN A DEVELOPING ACTIVE REGION. I. OBSERVATION OF LIGHT BRIDGE AND ITS DYNAMIC ACTIVITY PHENOMENA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toriumi, Shin; Katsukawa, Yukio; Cheung, Mark C. M., E-mail: shin.toriumi@nao.ac.jp

    Light bridges, the bright structures that divide the umbra of sunspots and pores into smaller pieces, are known to produce a wide variety of activity events in solar active regions (ARs). It is also known that the light bridges appear in the assembling process of nascent sunspots. The ultimate goal of this series of papers is to reveal the nature of light bridges in developing ARs and the occurrence of activity events associated with the light bridge structures from both observational and numerical approaches. In this first paper, exploiting the observational data obtained by Hinode, the Interface Region Imaging Spectrograph, andmore » the Solar Dynamics Observatory, we investigate the detailed structure of the light bridge in NOAA AR 11974 and its dynamic activity phenomena. As a result, we find that the light bridge has a weak, horizontal magnetic field, which is transported from the interior by a large-scale convective upflow and is surrounded by strong, vertical fields of adjacent pores. In the chromosphere above the bridge, a transient brightening occurs repeatedly and intermittently, followed by a recurrent dark surge ejection into higher altitudes. Our analysis indicates that the brightening is the plasma heating due to magnetic reconnection at lower altitudes, while the dark surge is the cool, dense plasma ejected from the reconnection region. From the observational results, we conclude that the dynamic activity observed in a light bridge structure such as chromospheric brightenings and dark surge ejections are driven by magnetoconvective evolution within the light bridge and its interaction with the surrounding magnetic fields.« less

  19. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on fixed bridges. 118.65 Section 118.65 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable...

  20. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on swing bridges. 118.70 Section 118.70 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each...

  1. Bridges and Equipment

    DTIC Science & Technology

    2009-09-15

    in.) Tire pressure +7 kPa (+1 psig) Ambient or chamber temperature +2 °C (+3.6 °F) Relative humidity (RH) +1% reading Wind speed +1 kt Distance... eccentric ), and number of bridge crossings. (4) Vehicle stopping data including speed, position, and direction on the bridge. (5) Ambient...fashion for initial trials, and then loads should be applied eccentrically . The load configuration as it was applied to the raft will be documented

  2. A data management infrastructure for bridge monitoring

    NASA Astrophysics Data System (ADS)

    Jeong, Seongwoon; Byun, Jaewook; Kim, Daeyoung; Sohn, Hoon; Bae, In Hwan; Law, Kincho H.

    2015-04-01

    This paper discusses a data management infrastructure framework for bridge monitoring applications. As sensor technologies mature and become economically affordable, their deployment for bridge monitoring will continue to grow. Data management becomes a critical issue not only for storing the sensor data but also for integrating with the bridge model to support other functions, such as management, maintenance and inspection. The focus of this study is on the effective data management of bridge information and sensor data, which is crucial to structural health monitoring and life cycle management of bridge structures. We review the state-of-the-art of bridge information modeling and sensor data management, and propose a data management framework for bridge monitoring based on NoSQL database technologies that have been shown useful in handling high volume, time-series data and to flexibly deal with unstructured data schema. Specifically, Apache Cassandra and Mongo DB are deployed for the prototype implementation of the framework. This paper describes the database design for an XML-based Bridge Information Modeling (BrIM) schema, and the representation of sensor data using Sensor Model Language (SensorML). The proposed prototype data management framework is validated using data collected from the Yeongjong Bridge in Incheon, Korea.

  3. Standard practice for washing and cleaning concrete bridge decks and substructure bridge seats including bridge bearings and expansion joints to prevent structural deterioration.

    DOT National Transportation Integrated Search

    2013-12-01

    This study is a supplement to a previous study of bridge washing practices that focused on steel : superstructures. This study examined the perceived costs and benefits of routine washing of both : steel and concrete bridges, with emphasis on substru...

  4. Virtual Bridge Design Challenge

    ERIC Educational Resources Information Center

    Mitts, Charles R.

    2013-01-01

    This design/problem-solving activity challenges students to design a replacement bridge for one that has been designated as either structurally deficient or functionally obsolete. The Aycock MS Technology/STEM Magnet Program Virtual Bridge Design Challenge is an authentic introduction to the engineering design process. It is a socially relevant…

  5. Strengthening bridges using composite materials.

    DOT National Transportation Integrated Search

    1998-03-01

    The objective of this research project is to outline methodologies for using Fiber Reinforced Polymer (FRP) composites to strengthen and rehabilitate reinforced concrete bridge elements. : Infrastructure deterioration and bridge strengthening techniq...

  6. 49 CFR 237.111 - Review of bridge inspection reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Review of bridge inspection reports. 237.111... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.111 Review of bridge inspection reports. Bridge inspection reports shall be reviewed by railroad bridge supervisors and railroad...

  7. 49 CFR 237.111 - Review of bridge inspection reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Review of bridge inspection reports. 237.111... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.111 Review of bridge inspection reports. Bridge inspection reports shall be reviewed by railroad bridge supervisors and railroad...

  8. Preservation treatment for wood bridge application

    Treesearch

    Jake Bigelow; Stan Lebow; Carol A. Clausen; Lowell Greimann; Terry J. Wipf

    2009-01-01

    Timber can often be a cost-effective construction material for new bridges. The durability of the bridge greatly depends on proper attention to construction details and fabrication, as well as proper preservative treatment before, during, and after construction. Material repair and replacement costs for bridges are a considerable expense for highway agencies. To...

  9. Remediation: Higher Education's Bridge to Nowhere

    ERIC Educational Resources Information Center

    Complete College America, 2012

    2012-01-01

    The intentions were noble. It was hoped that remediation programs would be an academic bridge from poor high school preparation to college readiness. Sadly, remediation has become instead higher education's "Bridge to Nowhere." This broken remedial bridge is travelled by some 1.7 million beginning students each year, most of whom will…

  10. Characterization of stormwater runoff from bridges in North Carolina and the effects of bridge deck runoff on receiving streams

    USGS Publications Warehouse

    Wagner, Chad R.; Fitzgerald, Sharon A.; Sherrell, Roy D.; Harned, Douglas A.; Staub, Erik L.; Pointer, Brian H.; Wehmeyer, Loren L.

    2011-01-01

    In 2008, the North Carolina General Assembly passed House Bill 2436 that required the North Carolina Department of Transportation (NCDOT) to study the water-quality effects of bridges on receiving streams. In response, the NCDOT and the U.S. Geological Survey (USGS) collaborated on a study to provide information necessary to address the requirements of the Bill. To better understand the effects of stormwater runoff from bridges on receiving streams, the following tasks were performed: (1) characterize stormwater runoff quality and quantity from a representative selection of bridges in North Carolina; (2) measure stream water quality upstream from selected bridges to compare bridge deck stormwater concentrations and loads to stream constituent concentrations and loads; and (3) determine if the chemistry of bed sediments upstream and downstream from selected bridges differs substantially based on presence or absence of a best management practice for bridge runoff.

  11. Estimation of potential bridge scour at bridges on state routes in South Dakota, 2003-07

    USGS Publications Warehouse

    Thompson, Ryan F.; Fosness, Ryan L.

    2008-01-01

    Flowing water can erode (scour) soils and cause structural failure of a bridge by exposing or undermining bridge foundations (abutments and piers). A rapid scour-estimation technique, known as the level-1.5 method and developed by the U.S. Geological Survey, was used to evaluate potential scour at bridges in South Dakota in a study conducted in cooperation with the South Dakota Department of Transportation. This method was used during 2003-07 to estimate scour for the 100-year and 500-year floods at 734 selected bridges managed by the South Dakota Department of Transportation on State routes in South Dakota. Scour depths and other parameters estimated from the level-1.5 analyses are presented in tabular form. Estimates of potential contraction scour at the 734 bridges ranged from 0 to 33.9 feet for the 100-year flood and from 0 to 35.8 feet for the 500-year flood. Abutment scour ranged from 0 to 36.9 feet for the 100-year flood and from 0 to 45.9 feet for the 500-year flood. Pier scour ranged from 0 to 30.8 feet for the 100-year flood and from 0 to 30.7 feet for the 500-year flood. The scour depths estimated by using the level-1.5 method can be used by the South Dakota Department of Transportation and others to identify bridges that may be susceptible to scour. Scour at 19 selected bridges also was estimated by using the level-2 method. Estimates of contraction, abutment, and pier scour calculated by using the level-1.5 and level-2 methods are presented in tabular and graphical formats. Compared to level-2 scour estimates, the level-1.5 method generally overestimated scour as designed, or in a few cases slightly underestimated scour. Results of the level-2 analyses were used to develop regression equations for change in head and average velocity through the bridge opening. These regression equations derived from South Dakota data are compared to similar regression equations derived from Montana and Colorado data. Future level-1.5 scour investigations in South

  12. Investigation of Aerodynamic Interference between Twin Deck Bridges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sitek, M. A.; Bojanowski, C.; Lottes, S. A.

    2016-05-01

    Construction of a twin bridge can be a cost effective and minimally disruptive way to increase capacity when an existing bridge is not near the end of its service life. With ever growing vehicular traffic, when demand approaches the capacity of many existing roads and bridges. Remodeling a structure with an insufficient number of lanes can be a good solution in case of smaller and less busy bridges. Closing down or reducing traffic on crossings of greater importance for the construction period, however, can result in major delays and revenue loss for commerce and transportation as well as increasing themore » traffic load on alternate route bridges. Multiple-deck bridges may be the answer to this issue. A parallel deck can be built next to the existing one, without reducing the flow. Additionally, a new bridge can be designed as a twin or multi-deck structure. Several such structures have been built throughout the United States, among them: - The New NY Bridge Project - the Tappan Zee Hudson River Crossing, - SR-182 Columbia River Bridge, - The Thaddeus Kosciusko Bridge (I-87), - The Allegheny River Bridge, Pennsylvania, which carries I76, - Fred Hartman Bridge, TX, see Figure 1.2. With a growing number of double deck bridges, additional, more detailed, studies on the interaction of such bridge pairs in windy conditions appears appropriate. Aerodynamic interference effects should be examined to assure the aerodynamic stability of both bridges. There are many studies on aerodynamic response of single deck bridges, but the literature on double-deck structures is not extensive. The experimental results from wind tunnels are still limited in number, as a parametric study is required, they can be very time consuming. Literature review shows that some investigation of the effects of gap-width and angle of wind incidence has been done. Most of the CFD computational studies that have been done were limited to 2D simulations. Therefore, it is desirable to investigate twin

  13. Penile skin bridges: causes and prevention.

    PubMed

    Kamal, Baher A

    2009-01-01

    The pathogenesis and methods of prevention of penile skin bridges are discussed, with a review of the literature. This was a retrospective study on 57 adult men who presented with penile skin bridges at King Fahd University Hospital, Khobar, Saudi Arabia, over a period of approximately 22 years. All patients gave a history of circumcision during the first month after birth. The bridges were surgically excised. The skin bridges were single (23 patients) or multiple (34 patients). Their edges were attached to the distal penile shaft proximally and the glans distally. Their width varied from 1 mm to 3 cm. They were all successfully excised under local or general anesthesia. Penile skin bridges are a rare complication of neonatal circumcision. They are caused by skin adhesions that occur during childhood. With aging, the adhesions separate partially at the corona to form bridges. Careful suturing and good dressing at the time of circumcision are simple procedures that can prevent adherence of the distal prepetual skin flap to the glans penis.

  14. Structural health monitoring of Lindquist bridge

    NASA Astrophysics Data System (ADS)

    Sargent, D. D.; Murison, E. R.; Bakht, B.; Mufti, A. A.

    2007-04-01

    Many forestry bridges in Canada are typically single-lane, single span structures with two steel plate girders and a deck comprising of precast reinforced concrete panels. The concept of arching in deck slabs was utilized in the steel-free precast panels used in the Lindquist Bridge in British Columbia, Canada. The panels were completely devoid of tensile reinforcement and transverse confinement to the panels was provided by external steel straps. After the bridge was constructed in 1998, electrical strain gauges were installed on the girders and straps. Static and dynamic load tests were performed. The cracks on the top and bottom of the deck were mapped in 1999 and 2003. In 2006, a load test and crack mapping were performed on the bridge. The strain readings in the straps were compared with the data obtained 8 years prior. After analysis of the strain gauge readings, conclusions were drawn on the performance of the bridge. The cracks were formed to accommodate arching action and it was concluded that the bridge is still performing as it was designed.

  15. Evaluation of the service performance of bridge components.

    DOT National Transportation Integrated Search

    2004-08-01

    This study was initiated to provide review of common bridges to determine the performance of their components. Seven bridge types were selected that constituted 85 % of the Kentucky Transportation Cabinet (KYTC) bridge inventory. 319 bridges were ins...

  16. Bridge inspection / washing program : bridge drainage program

    DOT National Transportation Integrated Search

    2002-02-01

    The Rhode Island Department of Transportation, Operations Division is responsible for operation and maintenance of roads and bridges, and construction of highway and multi-modal projects to improve the transportation system of our state. One of the m...

  17. The Importance of Bridging

    ERIC Educational Resources Information Center

    Zamboni, Camilla

    2014-01-01

    In this article, I will discuss the importance of the fundamental aspect of "bridging" in the wider context of language teaching. I will use "bridging" particularly in terms of cultural differences and underline the pivotal role of specific techniques, in a language class as well as in a pedagogy class or seminar, to help…

  18. Vehicle - Bridge interaction, comparison of two computing models

    NASA Astrophysics Data System (ADS)

    Melcer, Jozef; Kuchárová, Daniela

    2017-07-01

    The paper presents the calculation of the bridge response on the effect of moving vehicle moves along the bridge with various velocities. The multi-body plane computing model of vehicle is adopted. The bridge computing models are created in two variants. One computing model represents the bridge as the Bernoulli-Euler beam with continuously distributed mass and the second one represents the bridge as the lumped mass model with 1 degrees of freedom. The mid-span bridge dynamic deflections are calculated for both computing models. The results are mutually compared and quantitative evaluated.

  19. Phase and widening construction of steel bridges : [summary].

    DOT National Transportation Integrated Search

    2014-03-01

    Maintaining traffic flow for bridge widening and replacement projects often requires bridges to be constructed in phases so that traffic can travel on one : portion of the bridge while another portion is being : constructed. The bridge portions are t...

  20. Seismic response of precast segmental bridge superstructures.

    DOT National Transportation Integrated Search

    2006-12-01

    Precast segmental construction of bridges can accelerate construction and minimize the cost of bridges in highly congested urban environments and environmentally sensitive regions. Despite their proven benefits, the use of precast segmental bridges i...

  1. Uncontrolled concrete bridge parapet cracking.

    DOT National Transportation Integrated Search

    2013-06-01

    The Ohio Department of Transportation has recently identified the problem of wide-spread premature cracking of concrete bridge : parapets throughout its District 12 region (Northeast Ohio). Many of the bridge decks that contain these prematurely crac...

  2. Virginia Bridge Information Systems Laboratory.

    DOT National Transportation Integrated Search

    2014-06-01

    This report presents the results of applied data mining of legacy bridge databases, focusing on the Pontis and : National Bridge Inventory databases maintained by the Virginia Department of Transportation (VDOT). Data : analysis was performed using a...

  3. Integrated 3D bridge-condition visualization (BCV) to facilitate element-based bridge condition rating (EBCR).

    DOT National Transportation Integrated Search

    2015-11-01

    Routine inspection and maintenance records are essential for bridges to function well throughout their intended lifespan. : Although existing bridge management systems are efficient at data storage, it is difficult to conduct comprehensive data : ana...

  4. Key Royale bridge five year evaluation : [summary].

    DOT National Transportation Integrated Search

    2013-06-01

    The Florida Department of Transportation (FDOT) : maintains more than 6,500 bridges. Considering : the expense of repair and replacement of bridges, : extending their durability and service life is : important. Of special concern for bridges in : mar...

  5. Precast alternative for flat slab bridges : final report.

    DOT National Transportation Integrated Search

    2013-10-26

    The cast-in-place (CIP) concrete slab bridge and the hollow core flat slab bridge are two very common bridge types utilized by the : South Carolina Department of Transportation (SCDOT). The CIP bridge is durable but has a long construction time while...

  6. Controlled impact demonstration airframe bending bridges

    NASA Technical Reports Server (NTRS)

    Soltis, S. J.

    1986-01-01

    The calibration of the KRASH and DYCAST models for transport aircraft is discussed. The FAA uses computer analysis techniques to predict the response of controlled impact demonstration (CID) during impact. The moment bridges can provide a direct correlation between the predictive loads or moments that the models will predict and what was experienced during the actual impact. Another goal is to examine structural failure mechanisms and correlate with analytical predictions. The bending bridges did achieve their goals and objectives. The data traces do provide some insight with respect to airframe loads and structural response. They demonstrate quite clearly what's happening to the airframe. A direct quantification of metal airframe loads was measured by the moment bridges. The measured moments can be correlated with the KRASH and DYCAST computer models. The bending bridge data support airframe failure mechanisms analysis and provide residual airframe strength estimation. It did not appear as if any of the bending bridges on the airframe exceeded limit loads. (The observed airframe fracture was due to the fuselage encounter with the tomahawk which tore out the keel beam.) The airframe bridges can be used to estimate the impact conditions and those estimates are correlating with some of the other data measurements. Structural response, frequency and structural damping are readily measured by the moment bridges.

  7. FHWA LTBP Bridge Performance Primer

    DOT National Transportation Integrated Search

    2014-02-01

    This TechBrief defines bridge performance and discusses the importance of measuring performance and current practices for doing so. It identifies key issues to improving performance measures and the role the Long-Term Bridge Performance (LTBP) Progra...

  8. Colorado statewide historic bridge inventory.

    DOT National Transportation Integrated Search

    2011-05-01

    The purpose of the Colorado statewide historic bridge inventory was to document and evaluate the National : Register of Historic Places eligibility all on-system highway bridges and grade separation structures built in : Colorado between 1959 and 196...

  9. Bridge Frost Prediction by Heat and Mass Transfer Methods

    NASA Astrophysics Data System (ADS)

    Greenfield, Tina M.; Takle, Eugene S.

    2006-03-01

    Frost on roadways and bridges can present hazardous conditions to motorists, particularly when it occurs in patches or on bridges when adjacent roadways are clear of frost. To minimize materials costs, vehicle corrosion, and negative environmental impacts, frost-suppression chemicals should be applied only when, where, and in the appropriate amounts needed to maintain roadways in a safe condition for motorists. Accurate forecasts of frost onset times, frost intensity, and frost disappearance (e.g., melting or sublimation) are needed to help roadway maintenance personnel decide when, where, and how much frost-suppression chemical to use. A finite-difference algorithm (BridgeT) has been developed that simulates vertical heat transfer in a bridge based on evolving meteorological conditions at its top and bottom as supplied by a weather forecast model. BridgeT simulates bridge temperatures at numerous points within the bridge (including its upper and lower surface) at each time step of the weather forecast model and calculates volume per unit area (i.e., depth) of deposited, melted, or sublimed frost. This model produces forecasts of bridge surface temperature, frost depth, and bridge condition (i.e., dry, wet, icy/snowy). Bridge frost predictions and bridge surface temperature are compared with observed and measured values to assess BridgeT's skill in forecasting bridge frost and associated conditions.

  10. Design of piles for integral abutment bridges.

    DOT National Transportation Integrated Search

    1984-08-01

    More and more, integral abutment bridges are being used in place : of the more traditional bridge designs with expansion releases. In : this study, states which use integral abutment bridges were surveyed : to determine their current practice in the ...

  11. GRS bridge piers and abutments.

    DOT National Transportation Integrated Search

    2001-01-01

    This report presents the following three recent projects on load testing of geosynthetic-reinforced soil (GRS) bridge abutments and piers: a full-scale bridge pier load test conducted by the Turner-Fairbank Highway Research Center, Federal Highway Ad...

  12. Hydraulic and geomorphic monitoring of experimental bridge scour mitigation at selected bridges in Utah, 2003-05

    USGS Publications Warehouse

    Kenney, Terry A.; McKinney, Tim S.

    2006-01-01

    Unique bridge scour mitigation designs using concrete A-Jacks were developed by the Utah Department of Transportation and installed at the Colorado River Bridge at State Road 191 and the Green River Bridge at State Road 19. The U.S. Geological Survey monitored stream reaches at these sites by collecting streambed-topography and water-velocity data from 2003 through 2005. These data were acquired annually from a moving boat with an acoustic Doppler current profiler and a differential global positioning system. Raw unordered data were processed and readied for interpolation into organized datasets with DopplerMacros, a set of computer programs. Processed streambed topography data were geostatistically interpolated by using Ordinary Kriging, and inverse distance weighting interpolation was used in the development of the two-dimensional velocity datasets. These organized datasets of topography and velocity were developed for each survey of the two bridge sites. A comparison of the riverbed topography data for each survey was done. An increase in bed elevation related to the installation of the A-Jacks scour countermeasures is evident at the Colorado River Bridge at State Road 191. The three topographic datasets acquired after the installation at the Green River Bridge at State Road 19 show few changes.

  13. Hydraulic analysis of the Schoharie Creek bridge

    USGS Publications Warehouse

    Froehlich, David C.; Trent, Roy E.

    1989-01-01

    Ten people died on April 5, 1987 as a result of the collapse of two spans of a New York State Thruway bridge into the floodwaters of Schoharie Creek. The cause of the bridge failure was determined to be scour of bed material from under the foundations of piers supporting the bridge. To evaluate the hydraulic conditions that produced the scour, a two-dimensional finite element surface-water flow model was constructed. The model was used to obtain a detailed description of water-surface elevations and depth-averaged velocities within a reach that extends from about 4000 ft downstream of the bridge to about 6000 ft upstream of the bridge.

  14. Performance analysis of LAN bridges and routers

    NASA Technical Reports Server (NTRS)

    Hajare, Ankur R.

    1991-01-01

    Bridges and routers are used to interconnect Local Area Networks (LANs). The performance of these devices is important since they can become bottlenecks in large multi-segment networks. Performance metrics and test methodology for bridges and routers were not standardized. Performance data reported by vendors is not applicable to the actual scenarios encountered in an operational network. However, vendor-provided data can be used to calibrate models of bridges and routers that, along with other models, yield performance data for a network. Several tools are available for modeling bridges and routers - Network II.5 was used. The results of the analysis of some bridges and routers are presented.

  15. Estimating bridge stiffness using a forced-vibration technique for timber bridge health monitoring

    Treesearch

    James P. Wacker; Xiping Wang; Brian Brashaw; Robert J. Ross

    2006-01-01

    This paper describes an effort to refine a global dynamic testing technique for evaluating the overall stiffness of timber bridge superstructures. A forced vibration method was used to measure the frequency response of several simple-span, sawn timber beam (with plank deck) bridges located in St. Louis County, Minnesota. Static load deflections were also measured to...

  16. Field performance of timber bridges. 11, Spearfish Creek stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; K. Stanfill-McMillan

    The Spearfish Creek bridge was constructed in 1992 in Spearfish, South Dakota. It is a single-span, stress-laminated, box-beam superstructure. Performance of the bridge is being monitored for 5 years, beginning at installation. This report summarizes results for the first 3-1/2 years of monitoring and includes information on the design, construction, and field...

  17. Procedures for scour assessments at bridges in Pennsylvania

    USGS Publications Warehouse

    Cinotto, Peter J.; White, Kirk E.

    2000-01-01

    Scour is the process and result of flowing water eroding the bed and banks of a stream. Scour at nearly 14,300 bridges(1) spanning water, and the stability of river and stream channels in Pennsylvania, are being assessed by the U.S. Geological Survey (USGS) in cooperation with the Pennsylvania Department of Transportation (PennDOT). Procedures for bridge-scour assessments have been established to address the needs of PennDOT in meeting a 1988 Federal Highway Administration mandate requiring states to establish a program to assess all public bridges over water for their vulnerability to scour. The procedures also have been established to help develop an understanding of the local and regional factors that affect scour and channel stability. This report describes procedures for the assessment of scour at all bridges that are 20 feet or greater in length that span water in Pennsylvania. There are two basic types of assessment: field-viewed bridge site assessments, for which USGS personnel visit the bridge site, and office-reviewed bridge site assessments, for which USGS personnel compile PennDOT data and do not visit the bridge site. Both types of assessments are primarily focused at assisting PennDOT in meeting the requirements of the Federal Highway Administration mandate; however, both assessments include procedures for the collection and processing of ancillary data for subsequent analysis. Date of bridge construction and the accessibility of the bridge substructure units for inspection determine which type of assessment a bridge receives. A Scour-Critical Bridge Indicator Code and a Scour Assessment Rating are computed from selected collected and compiled data. PennDOT personnel assign the final Scour-Critical Bridge Indicator Code and a Scour Assessment Rating on the basis of their review of all data. (1)Words presented in bold type are defined in the Glossary section of this report.

  18. Rating and analysis of continuous girder bridges.

    DOT National Transportation Integrated Search

    1980-01-01

    Federal regulations prompted as a result of bridge failures require the rating of bridge structures for which federal funds will be utilized for rehabilitation and replacement. The large number of bridges in Virginia subject to being rated makes such...

  19. Design aids of NU I-girders bridges.

    DOT National Transportation Integrated Search

    2010-05-01

    Precast prestressed concrete I-Girder bridges have become the most dominant bridge system in the United States. In the early design : stages, preliminary design becomes a vital first step in designing an economical bridge. Within the state of Nebrask...

  20. Faster bridge construction using precast substructures : brief.

    DOT National Transportation Integrated Search

    2011-07-01

    Bridge replacement often requires road closures and detours that frustrate road users. It remains a key goal of Wisconsin DOT to reduce construction-related road use interruptions. This will be a challenge with bridges: Bridge inspections in 2007 ide...

  1. Hillsboro Canal bridge monitoring : [summary].

    DOT National Transportation Integrated Search

    2011-01-01

    Floridas inventory of 148 moveable bridges is : the largest in the nation. Most employ open grid : steel decks, which have important advantages : over solid bridge decks: they can be assembled in : the factory, are lightweight and easy to install;...

  2. BUILDING "BRIDGES" WITH QUALITY ASSURANCE

    EPA Science Inventory

    The papr describes how, rather than building "bridges" across centuries, quality assurance (QA) personnel have the opportunity to build bridges across technical disciplines, between public and private organizations, and between different QA groups. As reviewers and auditors of a...

  3. Monitoring bridge scour using fiber optic sensors.

    DOT National Transportation Integrated Search

    2015-04-01

    The scouring process excavates and carries away materials from the bed and banks of streams, and from : around the piers and abutments of bridges. Scour undermines bridges and may cause bridge failures due to : structural instability. In the last 30 ...

  4. Covered Bridge Security Manual

    Treesearch

    Brett Phares; Terry Wipf; Ryan Sievers; Travis Hosteng

    2013-01-01

    The design, construction, and use of covered timber bridges is all but a lost art in these days of pre-stressed concrete, high-performance steel, and the significant growth both in the volume and size of vehicles. Furthermore, many of the existing covered timber bridges are preserved only because of their status on the National Registry of Historic Places or the...

  5. Public response to bridge colors.

    DOT National Transportation Integrated Search

    1973-01-01

    To determine people's reactions to bridges painted in colors as white, yellow, green, blue, red, brown, black, and aluminum, two test bridges were selected in Charlottesville, Virginia. One was painted a different color each month and the other was k...

  6. Evaluation of bridge deck sealers.

    DOT National Transportation Integrated Search

    2014-06-01

    This study focuses on the evaluation of bridge deck sealers commonly used on highway bridge decks and : their relative performance. After reviewing the most up-to-date research findings on chemical sealers used : by state DOTs, four sealer products t...

  7. Evaluation of the Buena Vista IBRD bridge : a furthering of accelerated bridge construction in Iowa.

    DOT National Transportation Integrated Search

    2012-02-01

    The need to construct bridges that last longer, are less expensive, and take less time to build has increased. The importance of accelerated bridge construction (ABC) technologies has been realized by the Federal Highway Administration (FHWA) and the...

  8. Geotextile reinforced bridge approach embankment : Lake River Bridge - Malin Highway , Klamath County, Oregon : final report.

    DOT National Transportation Integrated Search

    1997-08-01

    An experimental construction method was evaluated at the Lost River Bridge in Klamath County to reduce the discontinuity between the bridge and the roadway. The method included combining soil in six 300-mm lifts interlaced with geotextile reinforceme...

  9. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this part...

  10. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program to...

  11. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program to...

  12. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this part...

  13. Salt bridge as a gatekeeper against partial unfolding.

    PubMed

    Hinzman, Mark W; Essex, Morgan E; Park, Chiwook

    2016-05-01

    Salt bridges are frequently observed in protein structures. Because the energetic contribution of salt bridges is strongly dependent on the environmental context, salt bridges are believed to contribute to the structural specificity rather than the stability. To test the role of salt bridges in enhancing structural specificity, we investigated the contribution of a salt bridge to the energetics of native-state partial unfolding in a cysteine-free version of Escherichia coli ribonuclease H (RNase H*). Thermolysin cleaves a protruding loop of RNase H(*) through transient partial unfolding under native conditions. Lys86 and Asp108 in RNase H(*) form a partially buried salt bridge that tethers the protruding loop. Investigation of the global stability of K86Q/D108N RNase H(*) showed that the salt bridge does not significantly contribute to the global stability. However, K86Q/D108N RNase H(*) is greatly more susceptible to proteolysis by thermolysin than wild-type RNase H(*) is. The free energy for partial unfolding determined by native-state proteolysis indicates that the salt bridge significantly increases the energy for partial unfolding by destabilizing the partially unfolded form. Double mutant cycles with single and double mutations of the salt bridge suggest that the partially unfolded form is destabilized due to a significant decrease in the interaction energy between Lys86 and Asp108 upon partial unfolding. This study demonstrates that, even in the case that a salt bridge does not contribute to the global stability, the salt bridge may function as a gatekeeper against partial unfolding that disturbs the optimal geometry of the salt bridge. © 2016 The Protein Society.

  14. Bridge Scour Measurements Using the Rfid Technology

    NASA Astrophysics Data System (ADS)

    Moustakidis, I.; Tsakiris, A. G.; Papanicolaou, T.

    2010-12-01

    The main purpose of this project is to develop a system for continuous monitoring scour around bridge piers and abutments (i.e. bridge scour) using the Radio Frequency IDentification (RFID) technology and examine its applicability for estimating scour around a pier or an existing bridge. Excessive bridge scour can compromise the bridge foundations and lead to dramatic bridge collapses with significant impacts on economy and traveling public safety. An RFID system consists of three main components: the low frequency reader (~134.2 kHz frequency), the transponder (derived from transmitter/responder) and the antenna (of rectangular shape with one or more loops). RFID is a technology that permits the wireless two-way transfer of information from a reader to a transponder via RF waves transmitted with an antenna. What makes RFIDs suitable for monitoring bridge scour is that no line of sight is necessary between the reader and the transponder, which can be detected even when it is buried in the bed substrate. The proposed system for monitoring bridge scour relies on the principle that transponders oriented perpendicular to antenna plane can be detected at longer distances, than transponders oriented parallel to it. We intend to attach transponders at predetermined locations (depths) along a chain with known length. The chain will subsequently be driven into the bed substrate at the location where bridge scour hole is expected within the detection range of the antenna, which will be installed directly above the chain. The chain will retain the transponders perpendicular to the antenna plane, so that they can be continuously detected. Once scour takes place, the transponders will be oriented parallel to the antenna plane and thus they will not be detected. The latter will indicate that bridge scour reached the known depth, at which the transponder was initially buried. Once a prototype RFID system is functional, future research will aim at combining it with satellite

  15. IceBridge: Bringing a Field Campaign Home

    NASA Astrophysics Data System (ADS)

    Woods, J.; Beck, J.; Bartholow, S.

    2015-12-01

    IceBridge, a six-year NASA mission, is the largest airborne survey of Earth's polar ice ever flown. It will yield an unprecedented three-dimensional view of Arctic and Antarctic ice sheets, ice shelves and sea ice. These flights will provide a yearly, multi-instrument look at the behavior of the rapidly changing features of the Greenland and Antarctic ice. Data collected during IceBridge will help scientists bridge the gap in polar observations between NASA's Ice, Cloud and Land Elevation Satellite (ICESat) -- in orbit since 2003 -- and ICESat-2, planned for 2017. ICESat stopped collecting science data in 2009, making IceBridge critical for ensuring a continuous series of observations. IceBridge will use airborne instruments to map Arctic and Antarctic areas once a year at a minimum, with new campaigns being developed during the Arctic melt season. IceBridge flights are conducted in the spring and summer for the Arctic and in the fall over Antarctica. Other smaller airborne surveys around the world are also part of the IceBridge campaign. IceBridge actively engages the public and educators through a variety of outlets ranging from communications strategies through social media outlets, to larger organized efforts such as PolarTREC. In field activities include blog posts, photo updates, in flight chat sessions, and more intensive live events to include google hangouts, where field team members can interact with the public during a scheduled broadcast. The IceBridge team provides scientists and other team members with the training and support to become communicators in their own right. There is an exciting new initiative where IceBridge will be collaborating with Undergraduate and Graduate students to integrate the next generation of scientists and communicators into the Science Teams. This will be explored through partnerships with institutions that are interested in mentoring through project based initiatives.

  16. Rapid replacement/construction of bridges.

    DOT National Transportation Integrated Search

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  17. Advanced bridge safety initiative : live load testing and load rating of the Evans Brook Bridge (#5506) and the Hastings Bridge (#5507) in Batchelders Grant, Maine.

    DOT National Transportation Integrated Search

    2014-01-01

    The Advanced Structures and Composites Center at the University of Maine (UMaine) performed live load testing : and rating factor analysis for two bridges (No. 5506 and No. 5507) in Batchelders Grant, Maine. The bridge load : rating performed by cons...

  18. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  19. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  20. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  1. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  2. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  3. 49 CFR 236.387 - Movable bridge locking.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Movable bridge locking. 236.387 Section 236.387 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... and Tests § 236.387 Movable bridge locking. Movable bridge locking shall be tested at least once a...

  4. 49 CFR 236.387 - Movable bridge locking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Movable bridge locking. 236.387 Section 236.387 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... and Tests § 236.387 Movable bridge locking. Movable bridge locking shall be tested at least once a...

  5. Phase II : correlation between experimental and finite element analysis : Alaska bridge 255-Chulitna River bridge.

    DOT National Transportation Integrated Search

    2014-09-01

    In this study, we will monitor the behavior of the Alaska Chulitna Bridge for the specific purpose of assisting the DOT in performing an accurate : condition assessment of this bridge. : Based on the state-of-the-art SHM knowledge and technologies wi...

  6. 33 CFR 118.85 - Lights on vertical lift bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Lights on vertical lift bridges... BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.85 Lights on vertical lift bridges. (a) Lift span lights. The vertical lift span of every vertical lift bridge shall be lighted so that the center of the...

  7. 33 CFR 118.85 - Lights on vertical lift bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on vertical lift bridges... BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.85 Lights on vertical lift bridges. (a) Lift span lights. The vertical lift span of every vertical lift bridge shall be lighted so that the center of the...

  8. Maximal liquid bridges between horizontal cylinders

    NASA Astrophysics Data System (ADS)

    Cooray, Himantha; Huppert, Herbert E.; Neufeld, Jerome A.

    2016-08-01

    We investigate two-dimensional liquid bridges trapped between pairs of identical horizontal cylinders. The cylinders support forces owing to surface tension and hydrostatic pressure that balance the weight of the liquid. The shape of the liquid bridge is determined by analytically solving the nonlinear Laplace-Young equation. Parameters that maximize the trapping capacity (defined as the cross-sectional area of the liquid bridge) are then determined. The results show that these parameters can be approximated with simple relationships when the radius of the cylinders is small compared with the capillary length. For such small cylinders, liquid bridges with the largest cross-sectional area occur when the centre-to-centre distance between the cylinders is approximately twice the capillary length. The maximum trapping capacity for a pair of cylinders at a given separation is linearly related to the separation when it is small compared with the capillary length. The meniscus slope angle of the largest liquid bridge produced in this regime is also a linear function of the separation. We additionally derive approximate solutions for the profile of a liquid bridge, using the linearized Laplace-Young equation. These solutions analytically verify the above-mentioned relationships obtained for the maximization of the trapping capacity.

  9. Modeling walker synchronization on the Millennium Bridge.

    PubMed

    Eckhardt, Bruno; Ott, Edward; Strogatz, Steven H; Abrams, Daniel M; McRobie, Allan

    2007-02-01

    On its opening day the London Millennium footbridge experienced unexpected large amplitude wobbling subsequent to the migration of pedestrians onto the bridge. Modeling the stepping of the pedestrians on the bridge as phase oscillators, we obtain a model for the combined dynamics of people and the bridge that is analytically tractable. It provides predictions for the phase dynamics of individual walkers and for the critical number of people for the onset of oscillations. Numerical simulations and analytical estimates reproduce the linear relation between pedestrian force and bridge velocity as observed in experiments. They allow prediction of the amplitude of bridge motion, the rate of relaxation to the synchronized state and the magnitude of the fluctuations due to a finite number of people.

  10. Structural characterization of UHPC waffle bridge deck and connections.

    DOT National Transportation Integrated Search

    2014-07-01

    The AASHTO strategic plan in 2005 for bridge engineering identified extending the service life of bridges and accelerating bridge : construction as two of the grand challenges in bridge engineering. These challenges have the objective of producing sa...

  11. Stability Limits and Dynamics of Nonaxisymmetric Liquid Bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Slobozhanin, Lev A.; Resnick, Andrew H.; Ramus, Jean-Francois; Delafontaine, Sylvie

    1999-01-01

    Liquid bridges have been the focus of numerous theoretical and experimental investigations since the early work by Plateau more than a century ago. More recently, motivated by interest in their physical behavior and their occurrence in a variety of technological situations, there has been a resurgence of interest in the static and dynamic behavior of liquid bridges. Furthermore, opportunities to carry out experiments in the near weightless environment of a low-Earth-orbit spacecraft have also led to a number of low-gravity experiments involving large liquid bridges. In this paper, we present selected results from our work concerning the stability of nonaxisymmetric liquid bridges, the bifurcation of weightless bridges in the neighborhood of the maximum volume stability limit, isorotating axisymmetric bridges contained between equidimensional disks, and bridges contained between unequal disks. For the latter, we discuss both theoretical and experimental results. Finally, we present results concerning the stability of axisymmetric equilibrium configurations for a capillary liquid partly contained in a closed circular cylinder.

  12. Guardrails for use on historic bridges : volume 1--replacement strategies.

    DOT National Transportation Integrated Search

    2016-11-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are : made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridge...

  13. Dynamic Interaction of Long Suspension Bridges with Running Trains

    NASA Astrophysics Data System (ADS)

    XIA, H.; XU, Y. L.; CHAN, T. H. T.

    2000-10-01

    This paper presents an investigation of dynamic interaction of long suspension bridges with running trains. A three-dimensional finite element model is used to represent a long suspension bridge. Each 4-axle vehicle in a train is modelled by a 27-degrees-of-freedom dynamic system. The dynamic interaction between the bridge and train is realized through the contact forces between the wheels and track. By applying a mode superposition technique to the bridge only and taking the measured track irregularities as known quantities, the number of degrees of freedom (d.o.f.) the bridge-train system is significantly reduced and the coupled equations of motion are efficiently solved. The proposed formulation and the associated computer program are then applied to a real long suspension bridge carrying a railway within the bridge deck. The dynamic response of the bridge-train system and the derail and offload factors related to the running safety of the train are computed. The results show that the formulation presented in this paper can well predict dynamic behaviors of both bridge and train with reasonable computation efforts. Dynamic interaction between the long suspension bridge and train is not significant.

  14. Highway bridge inspection : state-of-the-practice survey

    DOT National Transportation Integrated Search

    2001-04-01

    The congressionally mandated National Bridge Inspection program requires States to periodically inventory, inspect, and rate all highway bridges on public roads. The National Bridge Inspection Standards, implemented in 1971, prescribe minimum require...

  15. Polymer concrete bridge deck overlays : Deschutes River Bridge (Biggs) and Maupin Bridge (Maupin) : final report.

    DOT National Transportation Integrated Search

    1995-07-01

    This report documents the construction and performance of two thin polymer concrete (with polyester/styrene resins) bridge deck overlays. The overlays were constructed in Biggs and Maupin, Oregon in June 1993. : Several problems were encountered duri...

  16. Wind tunnel test of musi VI bridge

    NASA Astrophysics Data System (ADS)

    Permata, Robby; Andika, Matza Gusto; Syariefatunnisa, Risdhiawan, Eri; Hermawan, Budi; Noordiana, Indra

    2017-11-01

    Musi VI Bridge is planned to cross the Musi River in Palembang City, South Sumatera Province, Indonesia. The main span is a steel arch type with 200 m length and side span length is 75 m. Finite element analysis results showed that the bridge has frequency ratio for torsional and heaving mode (torsional frequency/heaving frequency)=1.14. This close to unity value rises concern about aerodynamic behaviour and stability of the bridge deck under wind loading. Sectional static and free vibration wind tunnel test were performed to clarify this phenomena in B2TA3 facility in Serpong, Indonesia. The test followed the draft of Guide of Wind Tunnel Test for Bridges developed by Indonesian Ministry of Public Works. Results from wind tunnel testing show that the bridge is safe from flutter instability and no coupled motion vibration observed. Therefore, low value of frequency ratio has no effect to aerodynamic behaviour of the bridge deck. Vortex-induced vibration in heaving mode occurred in relatively low wind velocity with permissible maximum amplitude value.

  17. A Bridge to Active Learning: A Summer Bridge Program Helps Students Maximize Their Active-Learning Experiences and the Active-Learning Experiences of Others

    PubMed Central

    Cooper, Katelyn M.; Ashley, Michael; Brownell, Sara E.

    2017-01-01

    National calls to improve student academic success in college have sparked the development of bridge programs designed to help students transition from high school to college. We designed a 2-week Summer Bridge program that taught introductory biology content in an active-learning way. Through a set of exploratory interviews, we unexpectedly identified that Bridge students had developed sophisticated views of active learning, even though this was not an explicit goal of the program. We conducted an additional set of semistructured interviews that focused on active learning and compared the interviews of Bridge students with those from non-Bridge students who had been eligible for but did not participate in the program. We used the constant comparative method to identify themes from the interviews. We found that Bridge students perceived that, because they knew how to approach active learning and viewed it as important, they benefited more from active learning in introductory biology than non-Bridge students. Specifically, Bridge students seemed to be more aware of their own learning gains from participating in active learning. Compared with the majority of non-Bridge students, the majority of Bridge students described using a greater variety of strategies to maximize their experiences in active learning. Finally, in contrast to non-Bridge students, Bridge students indicated that they take an equitable approach to group work. These findings suggest that we may be able to prime students to maximize their own and other’s experiences in active learning. PMID:28232588

  18. Toll bridge report to the California legislature, FY 2001 - 02

    DOT National Transportation Integrated Search

    2002-01-01

    In the San Francisco Bay Area, eight toll bridges serve as essential transportation arteries for the traveling public. Seven of the bridges are state-owned: the Antioch Bridge, the Benicia-Martinez Bridge, the Carquinez Bridge, the Richmond-San Rafae...

  19. Concrete bridge deck condition assessment and improvement strategies.

    DOT National Transportation Integrated Search

    2004-11-01

    The aging and deterioration of bridges in Utah mandates increasingly cost-effective strategies for bridge maintenance, rehabilitation, and repair (MR&R). Although the substructures and superstructures of bridges in Utah are in relatively good structu...

  20. 0-6722 : spread prestressed concrete slab beam bridges.

    DOT National Transportation Integrated Search

    2014-08-01

    The Texas Department of Transportation uses : precast prestressed concrete slab beam bridges for : shorter-span bridges of approximately 3050 ft in : length. Conventional slab beam bridges have slab : beams placed immediately adjacent to one anoth...

  1. Final report bridge design system analysis and modernization.

    DOT National Transportation Integrated Search

    2016-09-27

    The Bridge Design System (BDS) is an in-house software program developed by the Michigan Department of Transportations : (MDOT) Bridge Design Unit. The BDS designs bridges according to the required specifications, and outputs corresponding design ...

  2. Building Bridges One Line at a Time

    ERIC Educational Resources Information Center

    Grigsby, Cathy Murray

    2012-01-01

    In this article, first-grade students were taught the different kinds of lines that were part of the construction of various bridges--the curved lines of the arches of stone bridges, straight lines connecting the cables of a suspension bridge, vertical lines, horizontal lines, and so on. They gained practice in drawing structures and in fine brush…

  3. Characterization of railroad bridge service interruptions.

    DOT National Transportation Integrated Search

    2013-02-01

    The Federal Railroad Administration contracted Transportation Technology Center, Inc., to study bridge problems that cause accidents or service interruptions and to use this information to evaluate the need to develop bridge monitoring systems. Exist...

  4. Assessment of Bridging Requirements and Current Bridging Capabilities for use of Legacy Heavy Forces Inside the Contemporary Operational Environment

    DTIC Science & Technology

    2003-01-01

    vehicle-launched bridge (AVLB), the medium-girder bridge (MGB) and the Ribbon Bridge. The AVLB is capable of crossing 17-meter gaps using a crew under ... armor protection (FM 5-34, 2001). The MGB is capable of crossing single spans of 46.2 meters with the addition of a “link-reinforcement system” that

  5. Why the water bridge does not collapse

    NASA Astrophysics Data System (ADS)

    Aerov, Artem A.

    2011-09-01

    In 2007 an interesting phenomenon was discovered [J. Phys. DJPAPBE0022-372710.1088/0022-3727/40/19/052 40, 6112 (2007)]: a horizontal thread of water, the so-called water bridge, hangs in a horizontal electrostatic field. A different explanation of the water bridge stability is proposed herein: the force supporting it is the surface tension of water, while the role of the electric field is to not allow the water bridge to reduce its surface energy by breaking into separate drops. It is proven that electrostatic field is not the origin of the tension holding the bridge.

  6. 23 CFR 650.705 - Application for discretionary bridge funds.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Application for discretionary bridge funds. 650.705... TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.705 Application for discretionary bridge funds. Each year through its field offices, the FHWA will...

  7. 23 CFR 650.705 - Application for discretionary bridge funds.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for discretionary bridge funds. 650.705... TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.705 Application for discretionary bridge funds. Each year through its field offices, the FHWA will...

  8. New conceptual design of portable bamboo bridge for emergency purposes

    NASA Astrophysics Data System (ADS)

    Musthaffa, A. A.; Nor, N. M.; Yusof, M. A.; Yuhazri, M. Y.

    2018-02-01

    Portable bridges serve as routes for troops during the military operations and the disaster relief operation. Nowadays, bamboo has been regarded as one of the alternative construction materials for building and bridge structures. This paper presents the conceptual design of the portable bridge. Several types of portable bridges and bamboo bridges are reviewed in the current work. The characteristics, capability and method of construction of each bridge are discussed. Finally, the conceptual of the portable bamboo bridge for emergency purposes is presented. The idea of producing portable bridge is proposed in the current work as it is crucial for providing route for communities affected by natural disasters.

  9. A cloud-based information repository for bridge monitoring applications

    NASA Astrophysics Data System (ADS)

    Jeong, Seongwoon; Zhang, Yilan; Hou, Rui; Lynch, Jerome P.; Sohn, Hoon; Law, Kincho H.

    2016-04-01

    This paper describes an information repository to support bridge monitoring applications on a cloud computing platform. Bridge monitoring, with instrumentation of sensors in particular, collects significant amount of data. In addition to sensor data, a wide variety of information such as bridge geometry, analysis model and sensor description need to be stored. Data management plays an important role to facilitate data utilization and data sharing. While bridge information modeling (BrIM) technologies and standards have been proposed and they provide a means to enable integration and facilitate interoperability, current BrIM standards support mostly the information about bridge geometry. In this study, we extend the BrIM schema to include analysis models and sensor information. Specifically, using the OpenBrIM standards as the base, we draw on CSI Bridge, a commercial software widely used for bridge analysis and design, and SensorML, a standard schema for sensor definition, to define the data entities necessary for bridge monitoring applications. NoSQL database systems are employed for data repository. Cloud service infrastructure is deployed to enhance scalability, flexibility and accessibility of the data management system. The data model and systems are tested using the bridge model and the sensor data collected at the Telegraph Road Bridge, Monroe, Michigan.

  10. Diagnostic evaluation and repair of deteriorated concrete bridges.

    DOT National Transportation Integrated Search

    2004-12-01

    Concrete bridge deck degradation has been observed in several bridges located in north Mississippi. In this study a : survey was conducted to collect and document instances of deterioration in concrete bridges located throughout the State. The : main...

  11. Compilation of accelerated bridge construction (ABC) bridges : final report.

    DOT National Transportation Integrated Search

    2016-01-01

    Development of accelerated bridge construction (ABC) technologies has been occurring across the country, many times in : isolation. Although FHWA and others have worked to facilitate communication between these efforts, there was not a : comprehensiv...

  12. Verification of Texas superheavy load criteria for bridges.

    DOT National Transportation Integrated Search

    2011-11-01

    This report evaluates TxDOT criteria for the superheavy loads that trigger bridge analyses to determine : whether the criteria adequately protects Texas bridges. Researchers used solid modeling calibrated with a : bridge test of a 3-span continuous s...

  13. Diagnostic evaluation and repair of deteriorated concrete bridges

    DOT National Transportation Integrated Search

    2004-12-01

    Concrete bridge deck degradation has been observed in several bridges located in north Mississippi. In this study a survey was conducted to collect and document instances of deterioration in concrete bridges located throughout the State. The main cau...

  14. Developing a Tele-Robotic Platform for Bridge Inspection

    DOT National Transportation Integrated Search

    2011-05-01

    There are many bridges in Virginia with high traffic volumes or difficult access conditions which make these bridges difficult and expensive to inspect. In addition, the inspection of many bridges exposes the inspectors to hazardous conditions such a...

  15. Geosynthetic reinforced soil for low-volume bridge abutments.

    DOT National Transportation Integrated Search

    2012-01-01

    This report presents a review of literature on geosynthetic reinforced soil (GRS) bridge abutments, and test results and analysis from two : field demonstration projects (Bridge 1 and Bridge 2) conducted in Buchanan County, Iowa, to evaluate the feas...

  16. 25 CFR 170.507 - Who reviews bridge inspection reports?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Who reviews bridge inspection reports? 170.507 Section... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge Inspection § 170.507 Who reviews bridge inspection reports? The person responsible for the bridge inspection...

  17. Crashworthy railing for timber bridges

    Treesearch

    Michael A. Ritter; Ronald K. Faller; Sheila Rimal Duwadi

    1999-01-01

    Bridge railing systems in the United States have historically beers designed based on static load criteria given in the American Association of State Highway and Transportation 0fficials (AASHTO) Standard Specifications for Highway Bridges. In the past decade, full-scale vehicle crash testing has been recognized as a more appropriate and reliable method of evaluating...

  18. A Hierarchical Analysis of Bridge Decision Makers ... The Role of New Technology Adoption in the Timber Bridge Market: Special Project

    Treesearch

    Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt

    1995-01-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the United States. The Analytical Hierarchy Process was used to characterize the bridge material selection decision of these individuals. State Department of Transportation engineers, private consulting engineers, and local highway officials were personally interviewed in...

  19. Characterization of bridge foundations workshop report.

    DOT National Transportation Integrated Search

    2013-11-01

    "In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge foundations. To narrow the focus and develop a research roadmap for the program, a workshop on Characterization of Bridge Foundations...

  20. Environmental impacts of bridge cleaning operations.

    DOT National Transportation Integrated Search

    2003-02-01

    Cleaning (washing) operations of existing leaded paints on bridges were studied to determine the level of lead contamination in the resulting wastewater. Twelve experimental overcoating projects were let on bridges with various types of existing pain...

  1. Characterization of bridge foundations workshop report.

    DOT National Transportation Integrated Search

    2013-11-01

    In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge : foundations. To narrow the focus and develop a research roadmap for the program, a workshop on : Characterization of Bridge Foundation...

  2. Stability limits and dynamics of nonaxisymmetric liquid bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Resnik, Andy; Kaukler, William F.

    1993-01-01

    This program of theoretical and experimental ground-based and low gravity research is focussed on the understanding of the dynamics and stability limits of nonaxisymmetric liquid bridges. There are three basic objectives to the proposed work: (1) to determine the stability limits of nonaxisymmetric liquid bridges held between non-coaxially aligned disks; (2) to examine the dynamics of nonaxisymmetric bridges and nonaxisymmetric oscillations of initially axisymmetric bridges (some of these experiments require a low gravity environment and the ground-based research will culminate in a definitive flight experiment); and (3) to experimentally investigate the vibration sensitivity of liquid bridges under terrestrial and low gravity conditions.

  3. IceBridge team members

    NASA Image and Video Library

    2013-11-13

    These IceBridge team members aboard a huge U.S. Air Force C-17 transport aircraft are ready to step out into the cold Antarctic air. The C-17 aircraft that fly to Antarctica are operated by the U.S. Air Force's 62nd and 446th Airlift Wings based at Joint Base Lewis-McChord near Seattle, Wash. Credit: NASA/Goddard/Michael Studinger NASA's Operation IceBridge is an airborne science mission to study Earth's polar ice. For more information about IceBridge, visit: www.nasa.gov/icebridge NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  4. Developing a bridge scour warning system : technical summary.

    DOT National Transportation Integrated Search

    2016-09-01

    Flooding and scour can be major threats to the integrity of bridges. During flood events, : scour at bridge piers and abutments can undermine the foundations of the bridge, causing : significant damage or even total structure loss. Because scour occu...

  5. Methods of modifying historic bridges for contemporary use.

    DOT National Transportation Integrated Search

    1980-01-01

    Studied by a team of experts in the fields of history, bridge engineering, architecture, and computer analysis were 21 old truss bridges of historical importance located in Virginia. These old bridges are narrow and have low load-carrying capacities,...

  6. Developing a bridge scour warning system : final report.

    DOT National Transportation Integrated Search

    2016-09-01

    Flooding and scour can be major threats to the integrity of bridges. During flood events, scour at bridge piers : and abutments can undermine the foundations of the bridge, causing significant damage or even total structure loss. : Because scour occu...

  7. 49 CFR 237.71 - Determination of bridge load capacities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Determination of bridge load capacities. 237.71... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Capacity of Bridges § 237.71 Determination of bridge load capacities. (a) Each track owner shall determine the load capacity of each of its...

  8. 49 CFR 237.71 - Determination of bridge load capacities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Determination of bridge load capacities. 237.71... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Capacity of Bridges § 237.71 Determination of bridge load capacities. (a) Each track owner shall determine the load capacity of each of its...

  9. Scour damage to Vermont bridges and scour monitoring.

    DOT National Transportation Integrated Search

    2015-06-01

    Scour is by far the primary cause of bridge failures in the United States. Regionally, the : vulnerability of bridges to flood damage became evident from the damage seen to Vermont : bridges in the 2011 Tropical Storm Irene. Successfully mitigating s...

  10. Real time assessment of dynamic loads on bridges.

    DOT National Transportation Integrated Search

    2013-05-01

    Highway bridges are an important class of civil structures that are subject to continuously : acting and varying dynamic loads due to traffic. A large number of highway bridges in the US : (bridges on interstate highways or state highways which have ...

  11. Evaluation of Virginia's first heated bridge.

    DOT National Transportation Integrated Search

    2000-12-01

    This study is a contribution to the Heated Bridge Technology Program established in 1991 under the Intermodal Surface Transportation Efficiency Act. The goal of the program was to find durable and environmentally friendly heated bridge technologies f...

  12. Bridge response due to temperature variations.

    DOT National Transportation Integrated Search

    2014-05-01

    In order to more accurately quantify the behavior and degradation of bridges throughout their service life, the : Federal Highway Administration lunched the Long-Term Bridge Performance Program. As part of this program : an I-girder, integral abutmen...

  13. 33 CFR 118.110 - Daymarks and lateral lighting on bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bridges. 118.110 Section 118.110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.110 Daymarks and lateral lighting on bridges. (a... through bridges with U.S. aids to navigation system lateral marks and lights installed on the...

  14. 33 CFR 118.110 - Daymarks and lateral lighting on bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bridges. 118.110 Section 118.110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.110 Daymarks and lateral lighting on bridges. (a... through bridges with U.S. aids to navigation system lateral marks and lights installed on the...

  15. Monitoring system of arch bridge for safety network management

    NASA Astrophysics Data System (ADS)

    Joo, Bong Chul; Yoo, Young Jun; Lee, Chin Hyung; Park, Ki Tae; Hwang, Yoon Koog

    2010-03-01

    Korea has constructed the safety management network monitoring test systems for the civil infrastructure since 2006 which includes airport structure, irrigation structure, railroad structure, road structure, and underground structure. Bridges among the road structure include the various superstructure types which are Steel box girder bridge, suspension bridge, PSC-box-girder bridge, and arch bridge. This paper shows the process of constructing the real-time monitoring system for the arch bridge and the measured result by the system. The arch type among various superstructure types has not only the structural efficiency but the visual beauty, because the arch type superstructure makes full use of the feature of curve. The main measuring points of arch bridges composited by curved members make a difference to compare with the system of girder bridges composited by straight members. This paper also shows the method to construct the monitoring system that considers the characteristic of the arch bridge. The system now includes strain gauges and thermometers, and it will include various sensor types such as CCTV, accelerometers and so on additionally. For the long term and accuracy monitoring, the latest optical sensors and equipments are applied to the system.

  16. A Comparison of Limb-Socket Kinematics of Bone-Bridging and Non-Bone-Bridging Wartime Transtibial Amputations

    DTIC Science & Technology

    2012-05-16

    each successive loading interval. Subset analysis was performed on the basis of amputation type (bone bridging or non bone bridging) and suspension...fitting, patient care. Washington, DC: US Government Printing Office; 1969. 2. Ertl J. Uber amputationsstumpfe. Chirurg. 1949;20:218 24. 3. Pinto MA

  17. I-5/Gilman advanced technology bridge project

    NASA Astrophysics Data System (ADS)

    Lanza di Scalea, Francesco; Karbhari, Vistasp M.; Seible, Frieder

    2000-04-01

    The UCSD led I-5/Gilman Advanced Technology Bridge Project will design and construct a fully functional traffic bridge of advanced composite materials across Interstate 5 in La Jolla, California. Its objective is to demonstrate the use of advanced composite technologies developed by the aerospace industry in commercial applications to increase the life expectancy of new structures and for the rehabilitation of aging infrastructure components. The structure will be a 450 ft long, 60 ft wide cable-stayed bridge supported by a 150 ft A-frame pylon with two vehicular lanes, two bicycle lanes, pedestrian walkways and utility tunnels. The longitudinal girders and pylon will be carbon fiber shells filled with concrete. The transverse deck system will consist of hollow glass/carbon hybrid tubes and a polypropylene fiber reinforced concrete deck with an arch action. Selected cables will be composite. The bridge's structural behavior will be monitored to determine how advanced composite materials perform in civil infrastructure applications. The bridge will be instrumented to obtain performance and structural health data in real time and, where possible, in a remote fashion. The sensors applied to the bridge will include electrical resistance strain gages, fiberoptic Bragg gratings and accelerometers.

  18. 3. CONTEXTUAL VIEW OF BRIDGE IN SETTING, LOOKING SOUTHWEST FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. CONTEXTUAL VIEW OF BRIDGE IN SETTING, LOOKING SOUTHWEST FROM ELEVATED GRADE OF EUREKA SOUTHERN RAILROAD. EUREKA SOUTHERN TRUSS BRIDGE AT EXTREME LEFT, 1924 HIGHWAY BRIDGE IN CENTER, 1952 HIGHWAY BRIDGE AT RIGHT - Van Duzen River Bridge, Spanning Van Duzen River at CA State Highway 101, Alton, Humboldt County, CA

  19. 25. VIEW OF McGREGOR BRIDGE (18811936), CROSSING THE MERRIMACK RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. VIEW OF McGREGOR BRIDGE (1881-1936), CROSSING THE MERRIMACK RIVER AT BRIDGE STREET, LOOKING SOUTHEAST. NORTH ELEVATION OF DOUBLE-DECKED, THREE-SPAN DOUGLAS PATENT PARABOLIC IRON TRUSS ERECTED BY CORRUGATED METAL COMPANY (BERLIN IRON BRIDGE COMPANY, BERLIN, CT) From 'Bridge Street Bridge', photographer and date unknown. - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH

  20. Free energy landscape of a minimalist salt bridge model.

    PubMed

    Li, Xubin; Lv, Chao; Corbett, Karen M; Zheng, Lianqing; Wu, Dongsheng; Yang, Wei

    2016-01-01

    Salt bridges are essential to protein stability and dynamics. Despite the importance, there has been scarce of detailed discussion on how salt bridge partners interact with each other in distinct solvent exposed environments. In this study, employing a recent generalized orthogonal space tempering (gOST) method, we enabled efficient molecular dynamics simulation of repetitive breaking and reforming of salt bridge structures within a minimalist salt-bridge model, the Asp-Arg dipeptide and thereby were able to map its detailed free energy landscape in aqueous solution. Free energy surface analysis shows that although individually-solvated states are more favorable, salt-bridge states still occupy a noticeable portion of the overall population. Notably, the competing forces, e.g. intercharge attractions that drive the formation of salt bridges and solvation forces that pull the charged groups away from each other, are energetically comparable. As the result, the salt bridge stability is highly tunable by local environments; for instance when local water molecules are perturbed to interact more strongly with each other, the population of the salt-bridge states is likely to increase. Our results reveal the critical role of local solvent structures in modulating salt-bridge partner interactions and imply the importance of water fluctuations on conformational dynamics that involves solvent accessible salt bridge formations. © 2015 The Protein Society.

  1. Dynamic testing of the T223 bridge rail.

    DOT National Transportation Integrated Search

    2009-09-01

    The TxDOT T203 bridge rail is often used on bridges where asphalt overlays reduce the effective : height of the bridge rail. This reduction in height due to asphalt paving overlay is undesirable. For this : project, several geometric features were ch...

  2. Implementation of heat-straightening repairs for Louisiana bridges.

    DOT National Transportation Integrated Search

    1998-12-01

    The goal of this study was to implement the latest heat-straightening repair technology on a Louisiana Bridge. The bridge chosen was an overpass just east of Lake Charles crossing 1-10. Working with both state and district personnel, the bridge was r...

  3. Advanced bridge safety initiative: phase 2, task 1 - rivet testing of rivets taken from Maine truss bridge.

    DOT National Transportation Integrated Search

    2016-03-01

    The Maine Department of Transportation (MaineDOT) has removed 25 rivets from an existing, older truss bridge. : Many such truss bridges have low rating factors as determined using Federal Highway Administration (FHWA) : and the American Association o...

  4. Suicides by jumping from iconic bridges in Hong Kong.

    PubMed

    Wong, P W C; Chan, W S C; Lau, T K; Morgan, P R; Yip, P S F

    2009-01-01

    Three bridges in Hong Kong have become iconic sites for suicide since their openings 11 years ago. This retrospective record-based study aimed to examine suicides by jumping from a group of three iconic bridges in Hong Kong, and to explore potential preventive strategies on these bridges to prevent future suicide. We examined the Coroner's files of 12 people who killed themselves by jumping from the bridges between 1997 and 2007. We also examined the Coroner's files of other suicides in 2003, and compared them with the bridge suicides. The majority of the suicides were male, middle-age (40-59 years), married or cohabiting, not living alone, employed or self-employed, and in financial difficulty. None of these cases had a reported psychiatric diagnosis or psychiatric care history, and only one case had a history of suicidal attempt. Compared with other suicides in Hong Kong, the bridge jumpers were more likely to be younger, holding a job, indebted, free from a psychiatric and attempt history, and to leave a suicide note (p < .05). The bridge suicide cases in Hong Kong also appeared to be different from the profiles of bridge jumpers in other countries. Erection of an effective safety barrier has been found to prevent bridge suicides in many countries. Given the different characteristics of bridge jumpers in Hong Kong and the technical difficulties, more innovative ways may be needed to prevent suicides by such means. Potential prevention measures are discussed and, hopefully, will better inform the future design and development of bridges of significance.

  5. Bridge deck deterioration study : final report.

    DOT National Transportation Integrated Search

    1975-03-01

    The basic purpose of this study was to investigate three bridges in the northern section of Louisiana in an attempt to determine if there is sufficient deterioration and corrosion of the reinforcing steel to warrant a comprehensive study of bridge de...

  6. Construction of crack-free bridge decks.

    DOT National Transportation Integrated Search

    2017-04-01

    This serves as the final report on Transportation Pooled-Fund Program Project No. TPF-5(174), Construction : of Crack-Free Bridge Decks. The goal of the study was to implement the most cost-effective techniques for : improving bridge deck life ...

  7. Bridge-Scour Data Management System user's manual

    USGS Publications Warehouse

    Landers, Mark N.; Mueller, David S.; Martin, Gary R.

    1996-01-01

    The Bridge-Scour Data Management System (BSDMS) supports preparation, compilation, and analysis of bridge-scour data. The BSDMS provides interactive storage, retrieval, selection, editing, and display of bridge-scour data sets. Bridge-scour data sets include more than 200 site and measurement attributes of the channel geometry, flow hydraulics, hydrology, sediment, geomorphic-setting, location, and bridge specifications. This user's manual provides a general overview of the structure and organization of BSDMS data sets and detailed instructions to operate the program. Attributes stored by the BSDMS are described along with an illustration of the input screen where the attribute can be entered or edited. Measured scour depths can be compared with scour depths predicted by selected published equations using the BSDMS. The selected published equations available in the computational portion of the BSDMS are described. This manual is written for BSDMS, version 2.0. The data base will facilitate: (1) developing improved estimators of scour for specific regions or conditions; (2) describing scour processes; and (3) reducing risk from scour at bridges. BSDMS is available in DOS and UNIX versions. The program was written to be portable and, therefore, can be used on multiple computer platforms. Installation procedures depend on the computer platform, and specific installation instructions are distributed with the software. Sample data files and data sets of 384 pier-scour measurements from 56 bridges in 14 States are also distributed with the software.

  8. Foot force models of crowd dynamics on a wobbly bridge

    PubMed Central

    Belykh, Igor; Jeter, Russell; Belykh, Vladimir

    2017-01-01

    Modern pedestrian and suspension bridges are designed using industry standard packages, yet disastrous resonant vibrations are observed, necessitating multimillion dollar repairs. Recent examples include pedestrian-induced vibrations during the opening of the Solférino Bridge in Paris in 1999 and the increased bouncing of the Squibb Park Bridge in Brooklyn in 2014. The most prominent example of an unstable lively bridge is the London Millennium Bridge, which started wobbling as a result of pedestrian-bridge interactions. Pedestrian phase locking due to footstep phase adjustment is suspected to be the main cause of its large lateral vibrations; however, its role in the initiation of wobbling was debated. We develop foot force models of pedestrians’ response to bridge motion and detailed, yet analytically tractable, models of crowd phase locking. We use biomechanically inspired models of crowd lateral movement to investigate to what degree pedestrian synchrony must be present for a bridge to wobble significantly and what is a critical crowd size. Our results can be used as a safety guideline for designing pedestrian bridges or limiting the maximum occupancy of an existing bridge. The pedestrian models can be used as “crash test dummies” when numerically probing a specific bridge design. This is particularly important because the U.S. code for designing pedestrian bridges does not contain explicit guidelines that account for the collective pedestrian behavior. PMID:29296679

  9. Foot force models of crowd dynamics on a wobbly bridge.

    PubMed

    Belykh, Igor; Jeter, Russell; Belykh, Vladimir

    2017-11-01

    Modern pedestrian and suspension bridges are designed using industry standard packages, yet disastrous resonant vibrations are observed, necessitating multimillion dollar repairs. Recent examples include pedestrian-induced vibrations during the opening of the Solférino Bridge in Paris in 1999 and the increased bouncing of the Squibb Park Bridge in Brooklyn in 2014. The most prominent example of an unstable lively bridge is the London Millennium Bridge, which started wobbling as a result of pedestrian-bridge interactions. Pedestrian phase locking due to footstep phase adjustment is suspected to be the main cause of its large lateral vibrations; however, its role in the initiation of wobbling was debated. We develop foot force models of pedestrians' response to bridge motion and detailed, yet analytically tractable, models of crowd phase locking. We use biomechanically inspired models of crowd lateral movement to investigate to what degree pedestrian synchrony must be present for a bridge to wobble significantly and what is a critical crowd size. Our results can be used as a safety guideline for designing pedestrian bridges or limiting the maximum occupancy of an existing bridge. The pedestrian models can be used as "crash test dummies" when numerically probing a specific bridge design. This is particularly important because the U.S. code for designing pedestrian bridges does not contain explicit guidelines that account for the collective pedestrian behavior.

  10. Hierarchical analysis of bridge decision makers : the role of new technology adoption in the timber bridge market : special project fiscal year 1992

    DOT National Transportation Integrated Search

    1995-08-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the : United States. The Analytical Hierarchy Process was used to characterize the bridge material selection : decision of these individuals. State Departmen...

  11. Strengthening of rural bridges using rapid-installation FRP technology : route 63 bridge no. H356, Phelps County.

    DOT National Transportation Integrated Search

    2009-10-01

    This report presents the use of externally bonded fiber reinforced polymers (FRP) laminates for the flexural strengthening of a : concrete bridge. The bridge selected for this project is a two-span simply supported reinforced concrete slab with no tr...

  12. Research notes : polymer concrete bridge deck overlays : Deschutes River Bridge (Biggs), Maupin Bridge (Maupin) : final report.

    DOT National Transportation Integrated Search

    1995-07-01

    This report documents the construction and performance of two thin polymer concrete (with polyester/styrene resins) bridge deck overlays. The overlays were constructed in Biggs and Maupin, Oregon in June 1993. Construction of the overlays was less th...

  13. Debris mitigation methods for bridge piers.

    DOT National Transportation Integrated Search

    2012-06-01

    Debris accumulation on bridge piers is an on-going national problem that can obstruct the waterway openings at bridges and result in significant erosion of stream banks and scour at abutments and piers. In some cases, the accumulation of debris can a...

  14. Chapter 10:Hardwoods for timber bridges

    Treesearch

    James P. Wacker; Ed T. Cesa

    2005-01-01

    This chapter describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.

  15. A Bridge to Active Learning: A Summer Bridge Program Helps Students Maximize Their Active-Learning Experiences and the Active-Learning Experiences of Others.

    PubMed

    Cooper, Katelyn M; Ashley, Michael; Brownell, Sara E

    2017-01-01

    National calls to improve student academic success in college have sparked the development of bridge programs designed to help students transition from high school to college. We designed a 2-week Summer Bridge program that taught introductory biology content in an active-learning way. Through a set of exploratory interviews, we unexpectedly identified that Bridge students had developed sophisticated views of active learning, even though this was not an explicit goal of the program. We conducted an additional set of semistructured interviews that focused on active learning and compared the interviews of Bridge students with those from non-Bridge students who had been eligible for but did not participate in the program. We used the constant comparative method to identify themes from the interviews. We found that Bridge students perceived that, because they knew how to approach active learning and viewed it as important, they benefited more from active learning in introductory biology than non-Bridge students. Specifically, Bridge students seemed to be more aware of their own learning gains from participating in active learning. Compared with the majority of non-Bridge students, the majority of Bridge students described using a greater variety of strategies to maximize their experiences in active learning. Finally, in contrast to non-Bridge students, Bridge students indicated that they take an equitable approach to group work. These findings suggest that we may be able to prime students to maximize their own and other's experiences in active learning. © 2017 K. M. Cooper et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  16. Identifying hidden sexual bridging communities in Chicago.

    PubMed

    Youm, Yoosik; Mackesy-Amiti, Mary Ellen; Williams, Chyvette T; Ouellet, Lawrence J

    2009-07-01

    Bridge populations can play a central role in the spread of human immunodeficiency virus (HIV) by providing transmission links between higher and lower prevalence populations. While social network methods are well suited to the study of bridge populations, analyses tend to focus on dyads (i.e., risk between drug and/or sex partners) and ignore bridges between distinct subpopulations. This study takes initial steps toward moving the analysis of sexual network linkages beyond individual and risk group levels to a community level in which Chicago's 77 community areas are examined as subpopulations for the purpose of identifying potential bridging communities. Of particular interest are "hidden" bridging communities; that is, areas with above-average levels of sexual ties with other areas but whose below-average AIDS prevalence may hide their potential importance for HIV prevention. Data for this analysis came from the first wave of recruiting at the Chicago Sexual Acquisition and Transmission of HIV Cooperative Agreement Program site. Between August 2005 through October 2006, respondent-driven sampling was used to recruit users of heroin, cocaine, or methamphetamine, men who have sex with men regardless of drug use, the sex partners of these two groups, and sex partners of the sex partners. In this cross-sectional study of the sexual transmission of HIV, participants completed a network-focused computer-assisted self-administered interview, which included questions about the geographic locations of sexual contacts with up to six recent partners. Bridging scores for each area were determined using a matrix representing Chicago's 77 community areas and were assessed using two measures: non-redundant ties and flow betweenness. Bridging measures and acquired immunodeficiency syndrome (AIDS) case prevalence rates were plotted for each community area on charts representing four conditions: below-average bridging and AIDS prevalence, below-average bridging and above

  17. Research and development of weathering resistant bridge steel of Shougang

    NASA Astrophysics Data System (ADS)

    Yang, Yongda; Wang, Yanfeng; Huang, Leqing; Di, Guobiao; Ma, Changwen; Ma, Qingshen

    2017-09-01

    To introduce the composition design and mechanical properties and microstructure of the weathering bridge steel which would be used for bridge of Guanting reservoir. We adopt cyclic immersion corrosion test to study corrosion resistance difference of weathering bridge steel and common bridge steel. At the same corrosion time, the weight loss and corrosion rate of weathering bridge steel are lower than the common bridge steel's. Testing phase composition of rust layer by X-ray diffraction, two kinds of test steel's rust layer is mainly composed of Goethite and Fe3O4 and Fe2O3. At the same corrosion time, the percentage composition of goethite in rust layer of weathering bridge steel are significantly higher than common bridge steel's, the higher goethite content is, the compacter rust layer structure is. The compact rust layer would prevent the water and air passing the rust layer, and then preventing the further corrosion reaction, improving the corrosion resistance performance of weathering bridge steel.

  18. A loading study of older highway bridges in Virginia. Pt. 1, Steel truss bridge in Allegheny County.

    DOT National Transportation Integrated Search

    1976-01-01

    A comprehensive field test was conducted on a highway truss bridge in Allegheny County, Virginia, in July 1974. All typical truss members as well as structural members of the bridge floor system were instrumented and unit strains measured when the st...

  19. Aesthetic coatings for concrete bridge components

    NASA Astrophysics Data System (ADS)

    Kriha, Brent R.

    This thesis evaluated the durability and aesthetic performance of coating systems for utilization in concrete bridge applications. The principle objectives of this thesis were: 1) Identify aesthetic coating systems appropriate for concrete bridge applications; 2) Evaluate the performance of the selected systems through a laboratory testing regimen; 3) Develop guidelines for coating selection, surface preparation, and application. A series of site visits to various bridges throughout the State of Wisconsin provided insight into the performance of common coating systems and allowed problematic structural details to be identified. To aid in the selection of appropriate coating systems, questionnaires were distributed to coating manufacturers, bridge contractors, and various DOT offices to identify high performing coating systems and best practices for surface preparation and application. These efforts supplemented a literature review investigating recent publications related to formulation, selection, surface preparation, application, and performance evaluation of coating materials.

  20. 21. View of Clark Fork Vehicle Bridge facing west. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. View of Clark Fork Vehicle Bridge facing west. Looking at bridge deck, guard rail, juncture of two bridge spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  1. Guanidinium-Induced Denaturation by Breaking of Salt Bridges.

    PubMed

    Meuzelaar, Heleen; Panman, Matthijs R; Woutersen, Sander

    2015-12-07

    Despite its wide use as a denaturant, the mechanism by which guanidinium (Gdm(+) ) induces protein unfolding remains largely unclear. Herein, we show evidence that Gdm(+) can induce denaturation by disrupting salt bridges that stabilize the folded conformation. We study the Gdm(+) -induced denaturation of a series of peptides containing Arg/Glu and Lys/Glu salt bridges that either stabilize or destabilize the folded conformation. The peptides containing stabilizing salt bridges are found to be denatured much more efficiently by Gdm(+) than the peptides containing destabilizing salt bridges. Complementary 2D-infrared measurements suggest a denaturation mechanism in which Gdm(+) binds to side-chain carboxylate groups involved in salt bridges. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  2. Analysis of shielded CPW discontinuities with air-bridges

    NASA Technical Reports Server (NTRS)

    Dib, N. I.; Katehi, P. B.; Ponchak, George E.

    1992-01-01

    The effect of air-bridges on the performance of various coplanar waveguides (CPW) discontinuities is studied. Specifically, the coupled open-end CPW's and the short-end shunt CPW stub discontinuities are considered. The high frequency effect of the air-bridge is evaluated using a hybrid technique. At first, the frequency dependent equivalent circuit of the planar discontinuity without the air-bridge is derived using the Space Domain Integral Equation (SDIE) method. Then, the circuit is modified by incorporating the air-bridge's parasitic inductance and capacitance which are evaluated using a simple quasi-static model. The frequency response of each discontinuity with and without the air-bridge is studied and the scattering parameters are plotted in the frequency range 30-50 GHz for typical CPW dimensions.

  3. Instability of the capillary bridge

    NASA Astrophysics Data System (ADS)

    Pare, Gounseti; Hoepffner, Jerome

    2014-11-01

    Capillary adhesion is a physical mechanism that maintains two bodies in contact by capillarity through a liquid ligament. The capillary bridge is an idealization of this capillary adhesion. In this study we first focus on the classical case of the stability of the capillary bridge. Secondly we study a slightly more complex configuration, imagining a flow in the capillary bridge as in the case of the dynamics of the neck of a liquid ligament, in its withdrawal under the effect of capillarity. Inspired by the experiments on soap films of Plateau, the configuration analyzed consists of an initially axisymmetric, mass of fluid held by surface tension forces between two parallel, coaxial, solid pipes of the same diameter. The results presented are obtained by numerical simulations using the free software, Gerris Flow Solver. We first focus on the capillary Venturi. In the static configuration the stability diagram of the capillary bridge obtained is in perfect agreement with the results of Lev A. Slobozhanin. In the dynamic case we develop a matlab code based on the one dimensional equations of Eggers and Dupont. The comparison of the bifurcation diagram obtained and the numerical simulations shows a good agreement.

  4. Effect of voids in grouted post-tensioned concrete bridge construction : inspection and repair manual for external tendons in segmental, post-tensioned bridges.

    DOT National Transportation Integrated Search

    2009-11-01

    Segmental, post-tensioned (PT) bridges are major structures that carry significant traffic. These bridges are designed and constructed because they are economical for spanning long distances. In Texas, there are several signature PT bridges. In the l...

  5. 1. VIEW OF SOUTH ELEVATION OF NOTRE DANE BRIDGE, SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF SOUTH ELEVATION OF NOTRE DANE BRIDGE, SHOWING CAUSEWAY, STEEL ARCH, AND EASTBOUND LANE OF NEW BRIDGE UNDER CONSTRUCTION, PARALLELING CAUSEWAY, LOOKING NORTHWEST - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH

  6. GOOD HEALTH AND THE BRIDGING OF STRUCTURAL HOLES

    PubMed Central

    Cornwell, Benjamin

    2009-01-01

    Bridges that span structural holes are often explained in terms of the entrepreneurial personalities or rational motivations of brokers, or structural processes that lead to the intersection of social foci. I argue that the existence and use of bridges in interpersonal networks also depends on individuals’ health. Poor health may make it more difficult to withstand the pressures and to execute some of the common tasks associated with bridging (e.g., brokerage). I examine this possibility using egocentric network data on over 2,500 older adults drawn from the recent National Social Life, Health, and Aging Project (NSHAP). Multivariate regression analyses show that both cognitive and functional health are significantly positively associated with bridging, net of sociodemographic and life-course controls. The relationship between functional (kinesthetic) health and bridging appears to be partially mediated by network composition, as older adults who have poorer functional health also tend to have networks that are richer in strong ties. Several potential mediation mechanisms are discussed. Cognitive function remains significantly associated with bridging net of network composition, suggesting that the inherent challenges of maintaining bridging positions may be more difficult to cope with for those who have cognitive impairments than for those who have functional impairments such as limited mobility. An alternative explanation is that cognitively impaired individuals have more difficulty recognizing (and thus strategically using) bridges in their networks. Theoretical implications and possibilities for future research are discussed. PMID:20046998

  7. 28. Under ninth bridge, view to concrete dam and eighth ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Under ninth bridge, view to concrete dam and eighth bridge in background during heavy rain, view to the SW. - Vicksburg National Military Park Roads & Bridges, Melan Arch Bridges, Spanning various tributaries at Confederate Avenue, Vicksburg, Warren County, MS

  8. Random vibration analysis of train-bridge under track irregularities and traveling seismic waves using train-slab track-bridge interaction model

    NASA Astrophysics Data System (ADS)

    Zeng, Zhi-Ping; Zhao, Yan-Gang; Xu, Wen-Tao; Yu, Zhi-Wu; Chen, Ling-Kun; Lou, Ping

    2015-04-01

    The frequent use of bridges in high-speed railway lines greatly increases the probability that trains are running on bridges when earthquakes occur. This paper investigates the random vibrations of a high-speed train traversing a slab track on a continuous girder bridge subjected to track irregularities and traveling seismic waves by the pseudo-excitation method (PEM). To derive the equations of motion of the train-slab track-bridge interaction system, the multibody dynamics and finite element method models are used for the train and the track and bridge, respectively. By assuming track irregularities to be fully coherent random excitations with time lags between different wheels and seismic accelerations to be uniformly modulated, non-stationary random excitations with time lags between different foundations, the random load vectors of the equations of motion are transformed into a series of deterministic pseudo-excitations based on PEM and the wheel-rail contact relationship. A computer code is developed to obtain the time-dependent random responses of the entire system. As a case study, the random vibration characteristics of an ICE-3 high-speed train traversing a seven-span continuous girder bridge simultaneously excited by track irregularities and traveling seismic waves are analyzed. The influence of train speed and seismic wave propagation velocity on the random vibration characteristics of the bridge and train are discussed.

  9. Wearing surface testing : Yukon River bridge.

    DOT National Transportation Integrated Search

    2012-12-01

    The Yukon River Bridge, also known as the E.L. Patton Bridge, carries the twolane Dalton Highway and the trans-Alaska oil pipeline across the Yukon River at a 6% : grade. It is 30 feet wide, with 6 spans; it was designed to withstand -60 degrees Fahr...

  10. Neighborhood Bridges: 2010-2011 Evaluation Report

    ERIC Educational Resources Information Center

    Ingram, Debra

    2011-01-01

    In 2010-2011, students in twenty-five classrooms from eleven schools in the Minneapolis-Saint Paul metropolitan area participated in The Children's Theatre Company's Neighborhood Bridges (Bridges) program. The Children's Theatre Company contracted with the University of Minnesota's Center for Applied Research and Educational Improvement (CAREI) to…

  11. Live Load Testing of Historic Covered Timber Bridges

    Treesearch

    Travis Hosteng; James Wacker; Brent Phares

    2013-01-01

    The National Historic Covered Bridge Preservation Program (NHCBP), sponsored by the Federal Highway Administration (FHWA), is intended to preserve covered timber bridge structures nationwide. Today, less than 700 covered timber bridges still exist in the United States and of those many are closed to vehicular traffic. Furthermore, a large percentage of the remaining...

  12. Response modification for enhanced operation and safety of bridges.

    DOT National Transportation Integrated Search

    2011-08-01

    This report shows that safe extension of the service life of existing bridge structures is possible through bridge : health monitoring and structural response modification. To understand bridge health monitoring and structural : response modification...

  13. T-section glulam timber bridge modules : modeling and performance

    Treesearch

    Paul A. Morgan; Steven E. Taylor; Michael A. Ritter; John M. Franklin

    1999-01-01

    This paper describes the design, modeling, and testing of two portable timber bridges, each consisting of two noninterconnected longitudinal glued-laminated timber (glulam) deck panels 1.8 m (6 ft) wide. One bridge is 12.2 m (40 ft) long while the other bridge is 10.7 m (35 ft) long. The deck panels are fabricated in a unique double-tee cross section. The bridges...

  14. Effects of Irregular Bridge Columns and Feasibility of Seismic Regularity

    NASA Astrophysics Data System (ADS)

    Thomas, Abey E.

    2018-05-01

    Bridges with unequal column height is one of the main irregularities in bridge design particularly while negotiating steep valleys, making the bridges vulnerable to seismic action. The desirable behaviour of bridge columns towards seismic loading is that, they should perform in a regular fashion, i.e. the capacity of each column should be utilized evenly. But, this type of behaviour is often missing when the column heights are unequal along the length of the bridge, allowing short columns to bear the maximum lateral load. In the present study, the effects of unequal column height on the global seismic performance of bridges are studied using pushover analysis. Codes such as CalTrans (Engineering service center, earthquake engineering branch, 2013) and EC-8 (EN 1998-2: design of structures for earthquake resistance. Part 2: bridges, European Committee for Standardization, Brussels, 2005) suggests seismic regularity criterion for achieving regular seismic performance level at all the bridge columns. The feasibility of adopting these seismic regularity criterions along with those mentioned in literatures will be assessed for bridges designed as per the Indian Standards in the present study.

  15. 23 CFR 650.407 - Application for bridge replacement or rehabilitation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...

  16. 23 CFR 650.407 - Application for bridge replacement or rehabilitation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...

  17. Dynamics and statics of nonaxisymmetric and symmetric liquid bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Resnick, Andrew H.; Kaukler, William F.; Zhang, Yiqiang

    1994-01-01

    This program of theoretical and experimental ground-based research focuses on the understanding of the dynamics and stability limits of nonaxisymmetric and symmetric liquid bridges. There are three basic objectives: First, to determine the stability limits of nonaxisymmetric liquid bridges held between non-coaxial parallel disks, Second, to examine the dynamics of nonaxisymmetric bridges and nonaxisymmetric oscillations of initially axisymmetric bridges. The third objective is to experimentally investigate the vibration sensitivity of liquid bridges under terrestrial and low gravity conditions. Some of these experiments will require a low gravity environment and the ground-based research will culminate in a definitive flight experiment.

  18. Load ratings for standard bridges : final report, October 2008.

    DOT National Transportation Integrated Search

    2008-10-01

    A load rating states the load in tons which a vehicle can impose on a bridge. Changes in guidelines, standards, and customary uses of bridges require analyses of bridges to be updated and reevaluated.

  19. Myocardial bridges, neither rare nor isolated-Autopsy study.

    PubMed

    Teofilovski-Parapid, G; Jankovic, R; Kanjuh, V; Virmani, R; Danchin, N; Prates, N; Simic, D V; Parapid, B

    2017-03-01

    Myocardial bridge is a congenital anomaly with a markedly variable reported incidence on autopsy (4.7%-86%), likely related to geographical regions. Our previous retrospective study showed a prevalence of 0.8%, which we doubted to be the true one in the examined sample of the Serbian population. To assess the importance of the phenomenon we conducted a 2-year prospective study at the same institution. Ninety-six cadaver hearts from adult individuals of both genders (51 men, 45 women) who died from natural causes underwent special dissection. Tunneled coronary arteries and myocardium were examined using light microscopy. A total of 14 myocardial bridges were found in 13 (13.54%) hearts. This anomaly was insignificantly more common in men (13.72% vs. 13.33%, p>0.05). In one heart we noted two myocardial bridges (the left anterior interventricular artery and left marginal artery were overbridged). None of the myocardial bridges had been diagnosed during life. The most common causes of death were cardiac related. Myocardial bridges were located in the following areas: left anterior interventricular (50%), left circumflex artery (28.6%), left marginal artery (14.3%), and right coronary artery (7.1%). In 92.3% of cases, the right coronary artery was dominant. The only heart with a balanced-type had two bridges. Most of the myocardial bridges were long and deep. All tunneled coronary arteries, and although surrounded by "coronary cushion," were not protected from atherosclerosis. In 30.8% of hearts with myocardial bridges, we found additional coronary artery anomalies. Myocardial bridges were not rare in the examined sample of the Serbian population and were often associated with other coronary artery anomalies, rendering the carriers at higher risk. Copyright © 2016 Elsevier GmbH. All rights reserved.

  20. Railing systems for use on timber deck bridges

    Treesearch

    Ronald K. Faller; Michael A. Ritter; Barry T. Rosson; Sheila R. Duwadi

    1999-01-01

    Bridge railing systems in the United States have historically been designed based on static load criteria given in the AASHTO Standard Specifications for Highway Bridges. In the past decade, full-scale vehicle crash testing has been recognized as a more appropriate and reliable method of evaluating bridge railing acceptability. In 1989. AASHTO published the Guide...

  1. Dynamics and Statics of Nonaxisymmetric Liquid Bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Resnick, Andrew H.; Slobozhanin, L. A.

    1996-01-01

    Theoretical and experimental investigation of the stability of nonaxisymmetric and nonaxisymmetric bridges contained between equal and unequal radii disks as a function of Bond and Weber number with emphasis on the transition from unstable axisymmetric to stable nonaxisymmetric shapes, are conducted. Numerical analysis of the stability of nonaxisymmetric bridges between unequal disks for various orientations of the gravity vector is performed. Experimental and theoretical investigation of large (nonaxisymmetric) oscillations and breaking of liquid bridges are also conducted.

  2. OLD SUSPENSION BRIDGE. This view appears to be looking southeast, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OLD SUSPENSION BRIDGE. This view appears to be looking southeast, at the downstream side of the suspension bridge, which was replaced by the South Fork Trinity River Bridge - South Fork Trinity River Bridge, State Highway 299 spanning South Fork Trinity River, Salyer, Trinity County, CA

  3. A study on carbon nanotube bridge as a electromechanical memory device

    NASA Astrophysics Data System (ADS)

    Kang, Jeong Won; Ha Lee, Jun; Joo Lee, Hoong; Hwang, Ho Jung

    2005-04-01

    A nanoelectromechanical (NEM) nanotube random access memory (NRAM) device based on carbon nanotube (CNT) was investigated using atomistic simulations. For the CNT-based NEM memory, the mechanical properties of the CNT-bridge and van der Waals interactions between the CNT-bridge and substrate were very important. The critical amplitude of the CNT-bridge was 16% of the length of the CNT-bridge. As molecular dynamics time increased, the CNT-bridge went to the steady state under the electrostatic force with the damping of the potential and the kinetic energies of the CNT-bridge. The interatomic interaction between the CNT-bridge and substrate, value of the CNT-bridge slack, and damping rate of the CNT-bridge were very important for the operation of the NEM memory device as a nonvolatile memory.

  4. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs

    ERIC Educational Resources Information Center

    Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to…

  5. BIM authoring for an image-based bridge maintenance system of existing cable-supported bridges

    NASA Astrophysics Data System (ADS)

    Dang, N. S.; Shim, C. S.

    2018-04-01

    Infrastructure nowadays is increasingly become the main backbone for the metropolitan development in general. Along with the rise of new facilities, the demand in term of maintenance for the existing bridges is indispensable. Recently, the terminology of “preventive maintenance” is not unfamiliar with the engineer, literally is the use of a bridge maintenance system (BMS) based on a BIM-oriented model. In this paper, the process of generating a BMS based on BIM model is introduced in detail. Data management for this BMS is separated into two modules: site inspection system and information management system. The noteworthy aspect of this model lays on the closed and automatic process of “capture image, generate the technical damage report, and upload/feedback to the BMS” in real-time. A pilot BMS system for a cable-supported bridge is presented which showed a good performance and potential to further development of preventive maintenance.

  6. Myocardial bridges of the coronary arteries in the human fetal heart.

    PubMed

    Cakmak, Yusuf Ozgür; Cavdar, Safiye; Yalin, Aymelek; Yener, Nuran; Ozdogmus, Omer

    2010-09-01

    During the last century, many investigators reported on myocardial bridges in the adult human heart. In the present study, 39 human fetal hearts (the mean gestastional age was 30 weeks) were studied for myocardial bridging, and the results were correlated with adult data. Among the 39 (27 male and 12 female) fetal hearts studied, 26 bridges were observed on 18 fetal hearts (46.2%). Ten of the bridges had one myocardial bridge, whereas double myocardial bridges were observed in eight fetal hearts. The most frequent myocardial bridges were observed on the left anterior descending artery (LAD), which had 13 bridges (50%). Eight (30.7%) myocardial bridges were on the diagonal artery, and on the posterior descending artery there were five (19.3%). Myocardial bridges were not observed on the circumflex artery. The data presented in this study may provide potentially useful information for the preoperative evaluation of the newborn and may have a clinical implication for sudden fetal death.

  7. Overview of the National Timber Bridge Inspection Study

    Treesearch

    James P. Wacker; Brian K. Brashaw; Frank Jalinoos

    2013-01-01

    As many engineers begin to implement life cycle cost analyses within the preliminary bridge design phase, there is a significant need for more reliable data on the expected service life of highway bridges. Many claims are being made about the expected longevity of concrete and steel bridges, but few are based on actual performance data. Because engineers are least...

  8. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Lights on swing bridges. 118.70... LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each... an approaching vessel the swing span when closed will display three red lights on top of the span...

  9. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  10. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  11. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Lights on swing bridges. 118.70... LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each... an approaching vessel the swing span when closed will display three red lights on top of the span...

  12. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  13. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Lights on swing bridges. 118.70... LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each... an approaching vessel the swing span when closed will display three red lights on top of the span...

  14. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  15. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Lights on swing bridges. 118.70... LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each... an approaching vessel the swing span when closed will display three red lights on top of the span...

  16. Evaluation of a Concrete Continuous Beam Bridge Using Load Test

    NASA Astrophysics Data System (ADS)

    Zhang, Xiedong; Li, Hong; Li, Xiaofan; Xiang, Musheng; Shen, Chengwu

    2007-03-01

    Load test is an efficient way to evaluate highway bridges. This paper presents static and dynamic load tests on a prestressed concrete continuous beam bridge. We obtained the influence line and the vibration property of the bridge from FEM analysis. The stress, deformation and the vibration characteristics of the bridge were measured. We found that the measured data are consistent with those from the theoretical calculation, indicating good condition of the bridge.

  17. 46 CFR 113.35-17 - Vessels with navigating bridge control.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Vessels with navigating bridge control. 113.35-17... bridge control. Each vessel with navigating bridge throttle control must have a positive mechanical stop on each telegraph transmitter that prevents movement to the “Navigating Bridge Control” position...

  18. 26. VIEW FROM EAST IN BRIDGE TENDER'S HOUSE, LEVERS FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. VIEW FROM EAST IN BRIDGE TENDER'S HOUSE, LEVERS FOR GASOLINE ENGINE OPERATION FOR BRIDGE AND THEIR CONNECTIONS TO CONTROL RODS ON DOWNSTREAM SIDE OF SWING-SPAN; new bridge located in background - Tipers Bridge, Spanning Great Wicomico River at State Route 200, Kilmarnock, Lancaster County, VA

  19. 2. VIEW SHOWING SOUTH ELEVATION OF BRIDGE, LOOKING NORTH. THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW SHOWING SOUTH ELEVATION OF BRIDGE, LOOKING NORTH. THE ROCK ISLAND LINE RAILROAD BRIDGE CAN BE SEEN IN THE BACKGROUND TO THE NORTH, WITH THE BURLINGTON STREET BRIDGE IN THE DISTANCE Ryan - Benton Street Bridge, Spanning Iowa River at Benton Street, Iowa City, Johnson County, IA

  20. 46 CFR 113.35-17 - Vessels with navigating bridge control.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Vessels with navigating bridge control. 113.35-17... bridge control. Each vessel with navigating bridge throttle control must have a positive mechanical stop on each telegraph transmitter that prevents movement to the “Navigating Bridge Control” position...

  1. Implementation of sustainability in bridge design, construction and maintenance.

    DOT National Transportation Integrated Search

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  2. An expert system for the esthetic rating of bridges.

    DOT National Transportation Integrated Search

    1990-01-01

    The expert system presented should facilitate the in-depth analysis of bridge esthetics and encourage high standards for the appearance of bridges. The procedure described systematically evaluates features of a target bridge in relation to a similar ...

  3. A Hierarchical Analysis of Bridge Decision Makers; the Role of New Technology Adoption in the Timber Bridge Market: Special Project Fiscal Year 1992

    DOT National Transportation Integrated Search

    1995-08-01

    Bridge design engineers and local highway officials make bridge replacement decsions across the U.S. The Analytical Hierarchical Process was used to characterize the bridge material selection decisions of these individuals. State Departments of Trans...

  4. Students' Conceptions of Mathematics Bridging Courses

    ERIC Educational Resources Information Center

    Gordon, Sue; Nicholas, Jackie

    2013-01-01

    In this study we investigate the conceptions of mathematics bridging courses held by students enrolled in these courses at a major Australian university. We report on the participants' responses to email-interview questions about the mathematics bridging courses to describe a two-dimensional outcome space of variations in awareness about the…

  5. Theoretical mechanics: crowd synchrony on the Millennium Bridge.

    PubMed

    Strogatz, Steven H; Abrams, Daniel M; McRobie, Allan; Eckhardt, Bruno; Ott, Edward

    2005-11-03

    Soon after the crowd streamed on to London's Millennium Bridge on the day it opened, the bridge started to sway from side to side: many pedestrians fell spontaneously into step with the bridge's vibrations, inadvertently amplifying them. Here we model this unexpected and now notorious phenomenon--which was not due to the bridge's innovative design as was first thought--by adapting ideas originally developed to describe the collective synchronization of biological oscillators such as neurons and fireflies. Our approach should help engineers to estimate the damping needed to stabilize other exceptionally crowded footbridges against synchronous lateral excitation by pedestrians.

  6. Super-bridges suspended over carbon nanotube cables

    NASA Astrophysics Data System (ADS)

    Carpinteri, Alberto; Pugno, Nicola M.

    2008-11-01

    In this paper the new concept of 'super-bridges', i.e. kilometre-long bridges suspended over carbon nanotube cables, is introduced. The analysis shows that the use of realistic (thus defective) carbon nanotube bundles as suspension cables can enlarge the current limit main span by a factor of ~3. Too large compliance and dynamic self-excited resonances could be avoided by additional strands, rendering the super-bridge anchored as a spider's cobweb. As an example, we have computed the limit main spans of the current existing 19 suspended-deck bridges longer than 1 km assuming them to have substituted their cables with carbon nanotube bundles (thus maintaining the same geometry, with the exception of the length) finding spans of up to ~6.3 km. We thus suggest that the design of the Messina bridge in Italy, which would require a main span of ~3.3 km, could benefit from the use of carbon nanotube bundles. We believe that their use represents a feasible and economically convenient solution. The plausibility of these affirmations is confirmed by a statistical analysis of the existing 100 longest suspended bridges, which follow a Zipf's law with an exponent of 1.1615: we have found a Moore-like (i.e. exponential) law, in which the doubling of the capacity (here the main span) per year is substituted by the factor 1.0138. Such a law predicts that the realization of the Messina bridge using conventional materials will only occur around the middle of the present century, whereas it could be expected in the near future if carbon nanotube bundles were used. A simple cost analysis concludes the paper.

  7. Simple model of cable-stayed bridge deck subjected to static wind loading

    NASA Astrophysics Data System (ADS)

    Kang, Yi-Lung; Wang, Yang Cheng

    1997-05-01

    Cable-stayed bridges have been known since 18th century with aesthetics design. The structural system and the structural behavior are significantly different from those of continuous bridges. Compared to continuous bridge, cable- stayed bridges have more flexure bridge deck than those of continuous bridges.On the other hand, cable-stayed bridges have less stiffness to resist wind loading especially for lateral loads. The first considering of bridge engineering is safety. In 1940's, Tacoma Narrows Suspension Bridge destroyed by wind loading is a good example even though it is not a cable-stayed bridge. After the bridge was destroyed, a lot of research articles have been published regarding cable supported bridge subjected to wind loading. In recent days, high strength materials have been served. The bridge engineers use the advantages to expand the span length of cable-stayed bridges. Due to the span length increased and the use of high strength materials, cable- stayed bridges have more significant nonlinear behavior subjected to wind loading. In this paper, a slice bridge deck of cable-stayed bridge connected to internal support cables is considered. The deck has been considered to be subjected to lateral static wind loading. Since cables can not take compressive force, the deck has strongly nonlinear behavior even though the materials are linear elastic. Several primary load combinations have ben considered in this paper such as the bridge deck supposed to be moved horizontally without rotation or the bridge deck supposed to be moved horizontally with rotational deformation. The mathematical formulas and the numerical solutions are found and represented in graphical forms. The results can be provided to bridge designers and researchers for further study of this type of structure subjected to wind loading.

  8. Monitoring Bridge Dynamic Deformation in Vibration by Digital Photography

    NASA Astrophysics Data System (ADS)

    Yu, Chengxin; Zhang, Guojian; Liu, Xiaodong; Fan, Li; Hai, Hua

    2018-01-01

    This study adopts digital photography to monitor bridge dynamic deformation in vibration. Digital photography in this study is based on PST-TBPM (photographing scale transformation-time baseline parallax method). Firstly, we monitor the bridge in static as a zero image. Then, we continuously monitor the bridge in vibration as the successive images. Based on the reference points on each image, PST-TBPM is used to calculate the images to obtain the dynamic deformation values of these deformation points. Results show that the average measurement accuracies are 0.685 pixels (0.51mm) and 0.635 pixels (0.47mm) in X and Z direction, respectively. The maximal deformations in X and Z direction of the bridge are 4.53 pixels and 5.21 pixels, respectively. PST-TBPM is valid in solving the problem that the photographing direction is not perpendicular to the bridge. Digital photography in this study can be used to assess bridge health through monitoring the dynamic deformation of a bridge in vibration. The deformation trend curves also can warn the possible dangers over time.

  9. Structural Bridges through Fold Space.

    PubMed

    Edwards, Hannah; Deane, Charlotte M

    2015-09-01

    Several protein structure classification schemes exist that partition the protein universe into structural units called folds. Yet these schemes do not discuss how these units sit relative to each other in a global structure space. In this paper we construct networks that describe such global relationships between folds in the form of structural bridges. We generate these networks using four different structural alignment methods across multiple score thresholds. The networks constructed using the different methods remain a similar distance apart regardless of the probability threshold defining a structural bridge. This suggests that at least some structural bridges are method specific and that any attempt to build a picture of structural space should not be reliant on a single structural superposition method. Despite these differences all representations agree on an organisation of fold space into five principal community structures: all-α, all-β sandwiches, all-β barrels, α/β and α + β. We project estimated fold ages onto the networks and find that not only are the pairings of unconnected folds associated with higher age differences than bridged folds, but this difference increases with the number of networks displaying an edge. We also examine different centrality measures for folds within the networks and how these relate to fold age. While these measures interpret the central core of fold space in varied ways they all identify the disposition of ancestral folds to fall within this core and that of the more recently evolved structures to provide the peripheral landscape. These findings suggest that evolutionary information is encoded along these structural bridges. Finally, we identify four highly central pivotal folds representing dominant topological features which act as key attractors within our landscapes.

  10. 33 CFR 115.30 - Sufficiency of State authority for bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for bridges. 115.30 Section 115.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.30 Sufficiency of State authority for bridges. An opinion of the attorney general of the State as to the sufficiency of State...

  11. 14. Fifth Melan Bridge on tour route, Union Avenue near ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Fifth Melan Bridge on tour route, Union Avenue near Park Boundary, elevation view to the north, showing Culvert beyond park boundary. (bridge has now been replaced with box culvert). - Vicksburg National Military Park Roads & Bridges, Melan Arch Bridges, Spanning various tributaries at Confederate Avenue, Vicksburg, Warren County, MS

  12. 33 CFR 115.30 - Sufficiency of State authority for bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for bridges. 115.30 Section 115.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.30 Sufficiency of State authority for bridges. An opinion of the attorney general of the State as to the sufficiency of State...

  13. Application of Artificial Intelligence for Bridge Deterioration Model.

    PubMed

    Chen, Zhang; Wu, Yangyang; Li, Li; Sun, Lijun

    2015-01-01

    The deterministic bridge deterioration model updating problem is well established in bridge management, while the traditional methods and approaches for this problem require manual intervention. An artificial-intelligence-based approach was presented to self-updated parameters of the bridge deterioration model in this paper. When new information and data are collected, a posterior distribution was constructed to describe the integrated result of historical information and the new gained information according to Bayesian theorem, which was used to update model parameters. This AI-based approach is applied to the case of updating parameters of bridge deterioration model, which is the data collected from bridges of 12 districts in Shanghai from 2004 to 2013, and the results showed that it is an accurate, effective, and satisfactory approach to deal with the problem of the parameter updating without manual intervention.

  14. Application of Artificial Intelligence for Bridge Deterioration Model

    PubMed Central

    Chen, Zhang; Wu, Yangyang; Sun, Lijun

    2015-01-01

    The deterministic bridge deterioration model updating problem is well established in bridge management, while the traditional methods and approaches for this problem require manual intervention. An artificial-intelligence-based approach was presented to self-updated parameters of the bridge deterioration model in this paper. When new information and data are collected, a posterior distribution was constructed to describe the integrated result of historical information and the new gained information according to Bayesian theorem, which was used to update model parameters. This AI-based approach is applied to the case of updating parameters of bridge deterioration model, which is the data collected from bridges of 12 districts in Shanghai from 2004 to 2013, and the results showed that it is an accurate, effective, and satisfactory approach to deal with the problem of the parameter updating without manual intervention. PMID:26601121

  15. Threshold fluctuations in a superconducting current-carrying bridge

    NASA Astrophysics Data System (ADS)

    Marychev, P. M.; Vodolazov, D. Yu

    2017-07-01

    We calculate the energy of threshold fluctuation δ {F}{{thr}} which triggers the transition of a superconducting current-carrying bridge to the resistive state. We show that the dependence δ {F}{{thr}}{(I)\\propto {I}{{dep}}{\\hslash }(1-I/{I}{{dep}})}5/4/e, found by Langer and Ambegaokar for a long bridge with length L\\gg ξ , holds far below the critical temperature in both dirty and clean limits (here I dep is the depairing current of the bridge and ξ is a coherence length). We also find that even a ‘weak’ local defect (leading to a small suppression of the critical current of the bridge {I}{{c}}≲ {I}{{dep}}) provides δ {F}{{thr}}\\propto {I}{{c}}{\\hslash }{(1-I/{I}{{c}})}3/2/e, typical for a short bridge with L\\ll ξ or a Josephson junction.

  16. Consistency of the New York State bridge inspection program.

    DOT National Transportation Integrated Search

    2013-09-01

    The New York State Department of Transportation (NYSDOT) maintains an inventory of over 17,000 highway : bridges across the state. As per New York States Uniform Code of Bridge Inspections, all bridges in New York : State are inspected biennially,...

  17. Exploring the relevance of thiophene rings as bridge unit in acceptor-bridge-donor dyes on self-aggregation and performance in DSSCs.

    PubMed

    Zarate, Ximena; Saavedra-Torres, Mario; Rodriguez-Serrano, Angela; Gomez, Tatiana; Schott, Eduardo

    2018-04-30

    The possibility of dye charge recombination in DSSCs remains a challenge for the field. This consists of: (a) back-transfer from the TiO 2 to the oxidized dye and (b) intermolecular electron transfer between dyes. The latter is attributed to dye aggregation due to dimeric conformations. This leads to poor electron injection which decreases the photocurrent conversion efficiency. Most organic sensitizers are characterized by an Acceptor-Bridge-Donor (A-Bridge-D) arrangement that is commonly employed to provide charge separation and, therefore, lowering the unwanted back-transfer. Here, we address the intermolecular electron transfer by studying the dimerization and photovoltaic performance of a group of A-Bridge-D structured dyes. Specifically, eight famous sulfur containing π-bridges were analyzed (A and D remained fixed). Through quantum mechanical and molecular dynamics approaches, it was found that the formation of weakly stabilized dimers is allowed. The dyes with covalently bonded and fused thiophene rings as Bridges, 6d and 7d as well as 8d with a fluorene, would present high aggregation and, therefore, high probability of recombination processes. Conversely, using TiO 2 cluster and surface models, delineated the shortest bridges to improve the adsorption energy and the stability of the system. Finally, the elongation of the bridge up to 2 and 3 units and their photovoltaic parameters were studied. These results showed that all the sensitizers are able to provide similar photocurrent outcomes, regardless of whether the bridge is elongated. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  18. Damage identification in highway bridges using distribution factors

    NASA Astrophysics Data System (ADS)

    Gangone, Michael V.; Whelan, Matthew J.

    2017-04-01

    The U.S. infrastructure system is well behind the needs of the 21st century and in dire need of improvements. The American Society of Civil Engineers (ASCE) graded America's Infrastructure as a "D+" in its recent 2013 Report Card. Bridges are a major component of the infrastructure system and were awarded a "C+". Nearly 25 percent of the nation's bridges are categorized as deficient by the Federal Highway Administration (FWHA). Most bridges were designed with an expected service life of roughly 50 years and today the average age of a bridge is 42 years. Finding alternative methods of condition assessment which captures the true performance of the bridge is of high importance. This paper discusses the monitoring of two multi-girder/stringer bridges at different ages of service life. Normal strain measurements were used to calculate the load distribution factor at the midspan of the bridge under controlled loading conditions. Controlled progressive damage was implemented to one of the superstructures to determine if the damage could be detected using the distribution factor. An uncertainty analysis, based on the accuracy and precision of the normal strain measurement, was undertaken to determine how effective it is to use the distribution factor measurement as a damage indicator. The analysis indicates that this load testing parameter may be an effective measure for detecting damage.

  19. Expected damages of retrofitted bridges with RC jacketing

    NASA Astrophysics Data System (ADS)

    Montes, O.; Jara, J. M.; Jara, M.; Olmos, B. A.

    2015-07-01

    The bridge infrastructure in many countries of the world consists of medium span length structures built several decades ago and designed for very low seismic forces. Many of them are reinforced concrete structures that according to the current code regulations have to be rehabilitated to increase their seismic capacity. One way to reduce the vulnerability of the bridges is by using retrofitting techniques that increase the strength of the structure or by incorporating devices to reduce the seismic demand. One of the most common retrofit techniques of the bridges substructures is the use of RC jacketing; this research assesses the expected damages of seismically deficient medium length highway bridges retrofitted with reinforced concrete jacketing, by conducting a parametric study. We select a suite of twenty accelerograms of subduction earthquakes recorded close to the Pacific Coast in Mexico. The original structures consist of five 30 m span simple supported bridges with five pier heights of 5 m, 10 m, 15 m 20 and 25 m and the analyses include three different jacket thickness and three steel ratios. The bridges were subjected to the seismic records and non-linear time history analyses were carried out by using the OpenSEEs Plataform. Results allow selecting the reinforced concrete jacketing that better improves the expected seismic behavior of the bridge models.

  20. Post-Earthquake Traffic Capacity of Modern Bridges in California

    DOT National Transportation Integrated Search

    2010-03-01

    Evaluation of the capacity of a bridge to carry self-weight and traffic loads after an earthquake is essential for a : safe and timely re-opening of the bridge. In California, modern highway bridges designed using the Caltrans : Seismic Design Criter...

  1. Long-Term Bridge Performance (LTBP) Program Protocols, Version 1

    DOT National Transportation Integrated Search

    2016-01-01

    The Long-Term Bridge Performance (LTBP) Program is a long-term research effort to collect scientific performance data from a representative sample of bridges in the United States. Data will be collected for in-service bridges using a variety of techn...

  2. Evaluation of cracking of the US 331 bridge deck.

    DOT National Transportation Integrated Search

    2010-08-01

    The focus of this report is a three-span, continuous, skewed bridge that was constructed in the : summer of 2003 as the northbound roadway bridge on US 331 in Montgomery County, : Alabama. This bridge deck exhibited extensive transverse and horizonta...

  3. Long-term monitoring of the HPC Charenton Canal Bridge.

    DOT National Transportation Integrated Search

    2011-08-01

    The report contains long-term monitoring data collection and analysis of the first fully high : performance concrete (HPC) bridge in Louisiana, the Charenton Canal Bridge. The design of this : bridge started in 1997, and it was built and opened to tr...

  4. Remote bridge scour monitoring : a prioritization and implementation guideline

    DOT National Transportation Integrated Search

    1999-05-01

    Having the largest bridge population in the nation, the state of Texas stands to gain much through the development of bridge scour-monitoring and evaluation practices. Because it has such a large bridge population to manage, the Texas Department of T...

  5. 25 CFR 170.505 - How must bridge inspections be coordinated?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false How must bridge inspections be coordinated? 170.505 Section 170.505 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN... Bridge Inspection § 170.505 How must bridge inspections be coordinated? This section applies to bridge...

  6. Forensic testing of a double tee bridge.

    DOT National Transportation Integrated Search

    2014-12-01

    This report describes an investigation to quantify the behavior of precast, prestressed concrete double-tee bridge : girders made with lightweight concrete. As part of the investigation, three bridge girders were salvaged from a : decommissioned brid...

  7. Developing county bridge repair and retrofit techniques.

    DOT National Transportation Integrated Search

    2013-08-01

    Oklahoma rated first in the Nation in the percentage of bridges that are structurally deficient or : functionally obsolete. According to Federal Highway Administration data, Oklahoma uses : approximately 23,250 bridges maintained by state, County, Ci...

  8. Determination of bridge response using acceleration data.

    DOT National Transportation Integrated Search

    1996-01-01

    Knowledge of the actual displacement response of a bridge subjected to random traffic loading is useful in evaluating bridge performance and serviceability. However, mounting displacement transducers is difficult, and the feasibility of and cost asso...

  9. Multi-Hazard Assessment of Scour Damaged Bridges with UAS-Based Measurements

    NASA Astrophysics Data System (ADS)

    Özcan, O.; Ozcan, O.

    2017-12-01

    Flood and stream induced scour occurring in bridge piers constructed on rivers is one of the mostly observed failure reasons in bridges. Scour induced failure risk in bridges and determination of the alterations in bridge safety under seismic effects has the ultimate importance. Thus, for the determination of bridge safety under the scour effects, the scour amount under bridge piers should be designated realistically and should be tracked and updated continuously. Hereby, the scour induced failures in bridge foundation systems will be prevented and bridge substructure design will be conducted safely. In this study, in order to measure the amount of scour in bridge load bearing system (pile foundations and pile abutments) and to attain very high definition 3 dimensional models of river flood plain for the flood analysis, unmanned aircraft system (UAS) based measurement methods were implemented. UAS based measurement systems provide new and practical approach and bring high precision and reliable solutions considering recent measurement systems. For this purpose, the reinforced concrete (RC) bridge that is located on Antalya Boğaçayı River, Turkey and that failed in 2003 due to flood-induced scour was selected as the case study. The amount of scour occurred in bridge piers and piles was determined realistically and the behavior of bridge piers under scour effects was investigated. Future flood effects and the resultant amount of scour was determined with HEC-RAS software by using digital surface models that were obtained at regular intervals using UAS for the riverbed. In the light of the attained scour measurements and expected scour after a probable flood event, the behavior of scour damaged RC bridge was investigated by pushover and time history analyses under lateral and vertical seismic loadings. In the analyses, the load and displacement capacity of bridge was observed to diminish significantly under expected scour. Thus, the deterioration in multi hazard

  10. Development of a numerical model for vehicle-bridge interaction analysis of railway bridges

    NASA Astrophysics Data System (ADS)

    Kim, Hee Ju; Cho, Eun Sang; Ham, Jun Su; Park, Ki Tae; Kim, Tae Heon

    2016-04-01

    In the field of civil engineering, analyzing dynamic response was main concern for a long time. These analysis methods can be divided into moving load analysis method and moving mass analysis method, and formulating each an equation of motion has recently been studied after dividing vehicles and bridges. In this study, the numerical method is presented, which can consider the various train types and can solve the equations of motion for a vehicle-bridge interaction analysis by non-iteration procedure through formulating the coupled equations for motion. Also, 3 dimensional accurate numerical models was developed by KTX-vehicle in order to analyze dynamic response characteristics. The equations of motion for the conventional trains are derived, and the numerical models of the conventional trains are idealized by a set of linear springs and dashpots with 18 degrees of freedom. The bridge models are simplified by the 3 dimensional space frame element which is based on the Euler-Bernoulli theory. The rail irregularities of vertical and lateral directions are generated by PSD functions of the Federal Railroad Administration (FRA).

  11. Cross-bridge kinetics, cooperativity, and negatively strained cross- bridges in vertebrate smooth muscle. A laser-flash photolysis study

    PubMed Central

    1988-01-01

    The effects of laser-flash photolytic release of ATP from caged ATP [P3- 1(2-nitrophenyl)ethyladenosine-5'-triphosphate] on stiffness and tension transients were studied in permeabilized guinea pig protal vein smooth muscle. During rigor, induced by removing ATP from the relaxed or contracting muscles, stiffness was greater than in relaxed muscle, and electron microscopy showed cross-bridges attached to actin filaments at an approximately 45 degree angle. In the absence of Ca2+, liberation of ATP (0.1-1 mM) into muscles in rigor caused relaxation, with kinetics indicating cooperative reattachment of some cross- bridges. Inorganic phosphate (Pi; 20 mM) accelerated relaxation. A rapid phase of force development, accompanied by a decline in stiffness and unaffected by 20 mM Pi, was observed upon liberation of ATP in muscles that were released by 0.5-1.0% just before the laser pulse. This force increment observed upon detachment suggests that the cross- bridges can bear a negative tension. The second-order rate constant for detachment of rigor cross-bridges by ATP, in the absence of Ca2+, was estimated to be 0.1-2.5 X 10(5) M-1s-1, which indicates that this reaction is too fast to limit the rate of ATP hydrolysis during physiological contractions. In the presence of Ca2+, force development occurred at a rate (0.4 s-1) similar to that of intact, electrically stimulated tissue. The rate of force development was an order of magnitude faster in muscles that had been thiophosphorylated with ATP gamma S before the photochemical liberation of ATP, which indicates that under physiological conditions, in non-thiophosphorylated muscles, light-chain phosphorylation, rather than intrinsic properties of the actomyosin cross-bridges, limits the rate of force development. The release of micromolar ATP or CTP from caged ATP or caged CTP caused force development of up to 40% of maximal active tension in the absence of Ca2+, consistent with cooperative attachment of cross-bridges

  12. 14. RAILROAD BRIDGE MISSISSIPPI, MONROE CO., ABERDEEN Reach by foot ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. RAILROAD BRIDGE MISSISSIPPI, MONROE CO., ABERDEEN Reach by foot from E end of Vine St. St. Louis and San Francisco RR bridge. Bridge built 1887, replaced, 1969. Credit: Evans Memorial Library, Aberdeen, Ms. No date. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  13. Aerial view of the entire bridge crossing the Tennessee River ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Aerial view of the entire bridge crossing the Tennessee River looking up river. The swing bridge, when open, permits river navigational traffic to ply the river. Construction of a replacement bridge, to be located 93.27 feet down river, has now started. - Bridgeport Swing Span Bridge, Spanning Tennessee River, Bridgeport, Jackson County, AL

  14. 46 CFR 32.16-1 - Navigation bridge visibility-T/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Navigation bridge visibility-T/ALL. 32.16-1 Section 32..., AND HULL REQUIREMENTS Navigation Bridge Visibility § 32.16-1 Navigation bridge visibility-T/ALL. Each..., must meet the following requirements: (a) The field of vision from the navigation bridge, whether the...

  15. Guide for In-Place Treatment of Covered and Timber Bridges

    Treesearch

    Stan Lebow; Grant Kirker; Robert White; Terry Amburgey; H. Michael Barnes; Michael Sanders; Jeff Morrell

    2012-01-01

    Historic covered bridges and current timber bridges can be vulnerable to damage from biodeterioration or fire. This guide describes procedures for selecting and applying in-place treatments to prevent or arrest these forms of degradation. Vulnerable areas for biodeterioration in covered bridges include members contacting abutments, members near the ends of bridges...

  16. 13. UNIDENTIFIED CABLESTAYED SUSPENSION BRIDGE WITH TIMBER RAILING OF TWELVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. UNIDENTIFIED CABLE-STAYED SUSPENSION BRIDGE WITH TIMBER RAILING OF TWELVE PANELS, SHOWING CABLE PATTERN SIMILAR TO E.E. RUNYON'S SUSPENSION BRIDGE PATENTS. THE BLUFF DALE SUSPENSION BRIDGE'S CABLES MAY HAVE ORIGINALLY FOLLOWED THIS PATTERN. ELEVATION VIEW. - Bluff Dale Suspension Bridge, Spanning Paluxy River at County Route 149, Bluff Dale, Erath County, TX

  17. Risk Mitigation for Highway and Railway Bridges

    DOT National Transportation Integrated Search

    2009-02-01

    Performance of the transportation network strongly depends on the performance of bridges. Bridges constitute a vital part of the transportation infrastructure system and they are vulnerable to extreme events such as natural disasters (i.e., hurricane...

  18. 25 CFR 170.504 - When and how are bridge inspections performed?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false When and how are bridge inspections performed? 170.504... Bridge Inspection § 170.504 When and how are bridge inspections performed? IRR bridge inspections must be... standards (23 CFR 650.305). (a) Federal standards for bridge inspections are found in 23 CFR part 650...

  19. Development and validation of deterioration models for concrete bridge decks - phase 1 : artificial intelligence models and bridge management system.

    DOT National Transportation Integrated Search

    2013-06-01

    This research documents the development and evaluation of artificial neural network (ANN) models to predict the condition ratings of concrete highway bridge decks in Michigan. Historical condition assessments chronicled in the national bridge invento...

  20. Post-earthquake traffic capacity of modern bridges in California.

    DOT National Transportation Integrated Search

    2010-03-01

    Evaluation of the capacity of a bridge to carry self-weight and traffic loads after an earthquake is essential for a safe and timely re-opening of the bridge. In California, modern highway bridges designed using the Caltrans Seismic Design Criteria a...

  1. "Bridge #6 Rock Creek: Castiron 48" pipe lines to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    "Bridge #6 - Rock Creek: Cast-iron 48" pipe lines to Gravity - 1859." Construction photo of Pennsylvania Avenue Bridge, 1859. Photograph courtesy Washington Aqueduct Division, U.S. Army Corps of Engineers - Pennsylvania Avenue Bridge, Spanning Rock Creek & Potomac Parkway, Washington, District of Columbia, DC

  2. Bridge scour countermeasure assessments at select bridges in the United States, 2014–16

    USGS Publications Warehouse

    Dudunake, Taylor J.; Huizinga, Richard J.; Fosness, Ryan L.

    2017-05-23

    In 2009, the Federal Highway Administration published Hydraulic Engineering Circular No. 23 (HEC-23) to provide specific design and implementation guidelines for bridge scour and stream instability countermeasures. However, the effectiveness of countermeasures implemented over the past decade following those guidelines has not been evaluated. Therefore, in 2013, the U.S. Geological Survey, in cooperation with the Federal Highway Administration, began a study to assess the current condition of bridge-scour countermeasures at selected sites to evaluate their effectiveness. Bridge-scour countermeasures were assessed during 2014-2016. Site assessments included reviewing countermeasure design plans, summarizing the peak and daily streamflow history, and assessments at each site. Each site survey included a photo log summary, field form, and topographic and bathymetric geospatial data and metadata. This report documents the study area and site-selection criteria, explains the survey methods used to evaluate the condition of countermeasures, and presents the complete documentation for each countermeasure assessment.

  3. Vigorous convection in a sunspot granular light bridge

    NASA Astrophysics Data System (ADS)

    Lagg, Andreas; Solanki, Sami K.; van Noort, Michiel; Danilovic, Sanja

    2014-08-01

    Context. Light bridges are the most prominent manifestation of convection in sunspots. The brightest representatives are granular light bridges composed of features that appear to be similar to granules. Aims: An in-depth study of the convective motions, temperature stratification, and magnetic field vector in and around light bridge granules is presented with the aim of identifying similarities and differences to typical quiet-Sun granules. Methods: Spectropolarimetric data from the Hinode Solar Optical Telescope were analyzed using a spatially coupled inversion technique to retrieve the stratified atmospheric parameters of light bridge and quiet-Sun granules. Results: Central hot upflows surrounded by cooler fast downflows reaching 10 km s-1 clearly establish the convective nature of the light bridge granules. The inner part of these granules in the near surface layers is field free and is covered by a cusp-like magnetic field configuration. We observe hints of field reversals at the location of the fast downflows. The quiet-Sun granules in the vicinity of the sunspot are covered by a low-lying canopy field extending radially outward from the spot. Conclusions: The similarities between quiet-Sun and light bridge granules point to the deep anchoring of granular light bridges in the underlying convection zone. The fast, supersonic downflows are most likely a result of a combination of invigorated convection in the light bridge granule due to radiative cooling into the neighboring umbra and the fact that we sample deeper layers, since the downflows are immediately adjacent to the slanted walls of the Wilson depression. The two movies are available in electronic form at http://www.aanda.org

  4. Economic benefits of additional rail bridge capacity: a case study on the benefits of replacing the Merchants Bridge main spans at Saint Louis.

    DOT National Transportation Integrated Search

    2015-11-01

    The Merchants Memorial Mississippi Rail Bridge and MacArthur Bridge over the Mississippi River make up the most heavily : used Mississippi River rail crossing in the country. A large contributor to the popularity of the Merchants Bridge is its : acce...

  5. Wind Tunnel Measurements for Flutter of a Long-Afterbody Bridge Deck

    PubMed Central

    Chen, Zeng-Shun; Zhang, Cheng; Wang, Xu; Ma, Cun-Ming

    2017-01-01

    Bridges are an important component of transportation. Flutter is a self-excited, large amplitude vibration, which may lead to collapse of bridges. It must be understood and avoided. This paper takes the Jianghai Channel Bridge, which is a significant part of the Hong Kong-Zhuhai-Macao Bridge, as an example to investigate the flutter of the bridge deck. Firstly, aerodynamic force models for flutter of bridges were introduced. Then, wind tunnel tests of the bridge deck during the construction and the operation stages, under different wind attack angles and wind velocities, were carried out using a high frequency base balance (HFBB) system and laser displacement sensors. From the tests, the static aerodynamic forces and flutter derivatives of the bridge deck were observed. Correspondingly, the critical flutter wind speeds of the bridge deck were determined based on the derivatives, and they are compared with the directly measured flutter speeds. Results show that the observed derivatives are reasonable and applicable. Furthermore, the critical wind speeds in the operation stage is smaller than those in the construction stage. Besides, the flutter instabilities of the bridge in the construction and the operation stages are good. This study helps guarantee the design and the construction of the Jianghai Channel Bridge, and advances the understanding of flutter of long afterbody bridge decks. PMID:28208773

  6. Wind Tunnel Measurements for Flutter of a Long-Afterbody Bridge Deck.

    PubMed

    Chen, Zeng-Shun; Zhang, Cheng; Wang, Xu; Ma, Cun-Ming

    2017-02-09

    Bridges are an important component of transportation. Flutter is a self-excited, large amplitude vibration, which may lead to collapse of bridges. It must be understood and avoided. This paper takes the Jianghai Channel Bridge, which is a significant part of the Hong Kong-Zhuhai-Macao Bridge, as an example to investigate the flutter of the bridge deck. Firstly, aerodynamic force models for flutter of bridges were introduced. Then, wind tunnel tests of the bridge deck during the construction and the operation stages, under different wind attack angles and wind velocities, were carried out using a high frequency base balance (HFBB) system and laser displacement sensors. From the tests, the static aerodynamic forces and flutter derivatives of the bridge deck were observed. Correspondingly, the critical flutter wind speeds of the bridge deck were determined based on the derivatives, and they are compared with the directly measured flutter speeds. Results show that the observed derivatives are reasonable and applicable. Furthermore, the critical wind speeds in the operation stage is smaller than those in the construction stage. Besides, the flutter instabilities of the bridge in the construction and the operation stages are good. This study helps guarantee the design and the construction of the Jianghai Channel Bridge, and advances the understanding of flutter of long afterbody bridge decks.

  7. A Decision Support System for Concrete Bridge Maintenance

    NASA Astrophysics Data System (ADS)

    Rashidi, Maria; Lemass, Brett; Gibson, Peter

    2010-05-01

    The maintenance of bridges as a key element in transportation infrastructure has become a major concern for asset managers and society due to increasing traffic volumes, deterioration of existing bridges and well-publicised bridge failures. A pivotal responsibility for asset managers in charge of bridge remediation is to identify the risks and assess the consequences of remediation programs to ensure that the decisions are transparent and lead to the lowest predicted losses in recognized constraint areas. The ranking of bridge remediation treatments can be quantitatively assessed using a weighted constraint approach to structure the otherwise ill-structured phases of problem definition, conceptualization and embodiment [1]. This Decision Support System helps asset managers in making the best decision with regards to financial limitations and other dominant constraints imposed upon the problem at hand. The risk management framework in this paper deals with the development of a quantitative intelligent decision support system for bridge maintenance which has the ability to provide a source for consistent decisions through selecting appropriate remediation treatments based upon cost, service life, product durability/sustainability, client preferences, legal and environmental constraints. Model verification and validation through industry case studies is ongoing.

  8. Reserves in load capacity assessment of existing bridges

    NASA Astrophysics Data System (ADS)

    Žitný, Jan; Ryjáček, Pavel

    2017-09-01

    High percentage of all railway bridges in the Czech Republic is made of structural steel. Majority of these bridges is designed according to historical codes and according to the deterioration, they have to be assessed if they satisfy the needs of modern railway traffic. The load capacity assessment of existing bridges according to Eurocodes is however often too conservative and especially, braking and acceleration forces cause huge problems to structural elements of the bridge superstructure. The aim of this paper is to review the different approaches for the determination of braking and acceleration forces. Both, current and historical theoretical models and in-situ measurements are considered. The research of several local European state norms superior to Eurocode for assessment of existing railway bridges shows the big diversity of used local approaches and the conservativeness of Eurocode. This paper should also work as an overview for designers dealing with load capacity assessment, revealing the reserves for existing bridges. Based on these different approaches, theoretical models and data obtained from the measurements, the method for determination of braking and acceleration forces on the basis of real traffic data should be proposed.

  9. Standard plans for southern pine bridges

    Treesearch

    P. D. Hilbrich Lee; M. A. Ritter; M. H. Triche

    1995-01-01

    The development of standardized timber bridge plans and specifications is a key element in improving design and construction practices. The bridge plans presented were developed as a cooperative effort between the USDA Forest Service, Forest Products Laboratory (FPL); the University of Alabama; and the Southern Pine Council and are the first step in developing...

  10. Q-Bridge environmental impact statement : executive summary

    DOT National Transportation Integrated Search

    1997-04-01

    This Executive Summary provides a brief overview of the Final Environmental Impact Statement/Section 4(f) Evaluation (FEIS) for Interstate 95 (I-95) - Pearl Harbor Memorial Bridge (Q-Bridge) Crossing New Haven Harbor Study. The information presented ...

  11. A study of accidents involving highway bridges.

    DOT National Transportation Integrated Search

    1971-01-01

    Accident reports, field evaluations, state police and highway engineer questionnaire replies, and other data sources were used to conduct a general study of accidents involving highway bridges in Virginia. The bridges included in the study were divid...

  12. Potential-Scour Assessments at 130 Bridges in Iowa

    USGS Publications Warehouse

    Fischer, Edward E.

    1996-01-01

    A total of 130 highway bridges in Iowa were assessed for potential scour using a potential-scour index developed by the U.S. Geological Survey for a bridge-scour study in western Tennessee. Greater values of the index, which is composed of 11 components, suggest a greater likelihood of scour-related problems occurring at a bridge. For the Iowa assessments, the minimum value was 3, the median value was 11.5, and the maximum value was 24.5. None of the 130 bridges required immediate attention with regard to installing scour countermeasures. Based on the results of the assessments, it was concluded that assessing potential scour only once at a site would be of limited benefit in the Iowa Department of Transportation's bridge inspection program. Additional information would help determine whether repeated potential-scour assessments would enhance more timely and cost-effective implementation of scourcountermeasures.

  13. Innovative concrete bridging systems for pedestrian bridges : implementation and monitoring.

    DOT National Transportation Integrated Search

    2013-08-01

    Two precast, prestressed pedestrian bridges were designed for rapid construction in Rolla, MO, utilizing high-strength concrete (HSC) : and high-strength self-consolidating concrete (HS-SCC) with a target 28 day compressive strength of 68.9 MPa (10,0...

  14. Bridges, 1999.

    ERIC Educational Resources Information Center

    Wilcox, Bonita; Manear, John; Slifkin, Josh M.

    This volume contains articles about writing, best practice, portfolio assessment, and technology, as well as original poetry and book reviews. Articles in the volume are: "Teaching Writing: Making Connections" (Eric Schott); "Empowering Teachers: A Success Story" (Sandra L. Krivak); "Bridging the Gap between the Classroom and Employment" (Linda C.…

  15. Elkmont Vehicle Bridge, Construction PeelAway Great Smoky Mountains National ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Elkmont Vehicle Bridge, Construction Peel-Away - Great Smoky Mountains National Park Roads & Bridges, Elkmont Vehicle Bridge, Spanning Little River at Elkmont Campground, Gatlinburg, Sevier County, TN

  16. Analytical investigation of bidirectional ductile diaphragms in multi-span bridges

    NASA Astrophysics Data System (ADS)

    Wei, Xiaone; Bruneau, Michel

    2018-04-01

    In the AASHTO Guide Specifications for Seismic Bridge Design Provisions, ductile diaphragms are identified as Permissible Earthquake-Resisting Elements (EREs), designed to help resist seismic loads applied in the transverse direction of bridges. When adding longitudinal ductile diaphragms, a bidirectional ductile diaphragm system is created that can address seismic excitations acting along both the bridge's longitudinal and transverse axes. This paper investigates bidirectional ductile diaphragms with Buckling Restrained Braces (BRBs) in straight multi-span bridge with simply supported floating spans. The flexibility of the substructures in the transverse and longitudinal direction of the bridge is considered. Design procedures for the bidirectional ductile diaphragms are first proposed. An analytical model of the example bridge with bidirectional ductile diaphragms, designed based on the proposed methodology, is then built in SAP2000. Pushover and nonlinear time history analyses are performed on the bridge model, and corresponding results are presented. The effect of changing the longitudinal stiffness of the bidirectional ductile diaphragms in the end spans connecting to the abutment is also investigated, in order to better understand the impact on the bridge's dynamic performance.

  17. A forecast of bridge engineering, 1980-2000.

    DOT National Transportation Integrated Search

    1979-01-01

    A three-pronged study was undertaken to forecast the nature of bridge engineering and construction for the years 1980 to 2000. First, the history of bridge engineering was explored to extrapolate likely future developments. Second, a detailed questio...

  18. 33 CFR 401.52 - Limit of approach to a bridge.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Limit of approach to a bridge... approach to a bridge. (a) No vessel shall pass the limit of approach sign at any movable bridge until the bridge is in a fully open position and the signal light shows green. (b) No vessel shall pass the limit...

  19. 15. OLD ROAD BRIDGE MISSISSIPPI, MONROE CO., ABERDEEN (EAST ABERDEEN) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. OLD ROAD BRIDGE MISSISSIPPI, MONROE CO., ABERDEEN (EAST ABERDEEN) One mile E of Aberdeen, 1000 ft. N of (1978) U.S. 45 bridge. Oblique view of bridge, in early 1900s. Credit: Evans Memorial Library, Aberdeen, MS. No date. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  20. 13. Looking north, from the southern approach to the bridge. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Looking north, from the southern approach to the bridge. The bridge deck, which is concrete with several patch coats of asphalt (now chiefly gravel and some turf), demonstrates a sharp gradient from the abutment to the bridge center line. - Vigo County Bridge No. 139, Spanning Sugar Creek at Seventy-fourth Place, Terre Haute, Vigo County, IN

  1. View of Flume Bridge #5 from FS 502 looking downstream ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Flume Bridge #5 from FS 502 looking downstream (south). Bridge is on the left side of the photograph. This is similar to other flume bridges in the system and is the only photograph representing these features. - Childs-Irving Hydroelectric Project, Childs System, Flume Bridge No. 5, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  2. 33 CFR 401.52 - Limit of approach to a bridge.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Limit of approach to a bridge... approach to a bridge. (a) No vessel shall pass the limit of approach sign at any movable bridge until the bridge is in a fully open position and the signal light shows green. (b) No vessel shall pass the limit...

  3. 12. UNIDENTIFIED CABLESTAYED SUSPENSION BRIDGE WITH TIMBER RAILING OF TWELVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. UNIDENTIFIED CABLE-STAYED SUSPENSION BRIDGE WITH TIMBER RAILING OF TWELVE PANELS, SHOWING CABLE PATTERN SIMILAR TO E.E. RUNYON'S SUSPENSION BRIDGE PATENTS. THE BLUFF DALE SUSPENSION BRIDGE'S CABLES MAY HAVE ORIGINALLY FOLLOWED THIS PATTERN. 3/4 VIEW FROM ABOVE. - Bluff Dale Suspension Bridge, Spanning Paluxy River at County Route 149, Bluff Dale, Erath County, TX

  4. Determination Method of Bridge Rotation Angle Response Using MEMS IMU.

    PubMed

    Sekiya, Hidehiko; Kinomoto, Takeshi; Miki, Chitoshi

    2016-11-09

    To implement steel bridge maintenance, especially that related to fatigue damage, it is important to monitor bridge deformations under traffic conditions. Bridges deform and rotate differently under traffic load conditions because their structures differ in terms of length and flexibility. Such monitoring enables the identification of the cause of stress concentrations that cause fatigue damage and the proposal of appropriate countermeasures. However, although bridge deformation monitoring requires observations of bridge angle response as well as the bridge displacement response, measuring the rotation angle response of a bridge subject to traffic loads is difficult. Theoretically, the rotation angle response can be calculated by integrating the angular velocity, but for field measurements of actual in-service bridges, estimating the necessary boundary conditions would be difficult due to traffic-induced vibration. To solve the problem, this paper proposes a method for determining the rotation angle response of an in-service bridge from its angular velocity, as measured by a inertial measurement unit (IMU). To verify our proposed method, field measurements were conducted using nine micro-electrical mechanical systems (MEMS) IMUs and two contact displacement gauges. The results showed that our proposed method provided high accuracy when compared to the reference responses calculated by the contact displacement gauges.

  5. Determination Method of Bridge Rotation Angle Response Using MEMS IMU

    PubMed Central

    Sekiya, Hidehiko; Kinomoto, Takeshi; Miki, Chitoshi

    2016-01-01

    To implement steel bridge maintenance, especially that related to fatigue damage, it is important to monitor bridge deformations under traffic conditions. Bridges deform and rotate differently under traffic load conditions because their structures differ in terms of length and flexibility. Such monitoring enables the identification of the cause of stress concentrations that cause fatigue damage and the proposal of appropriate countermeasures. However, although bridge deformation monitoring requires observations of bridge angle response as well as the bridge displacement response, measuring the rotation angle response of a bridge subject to traffic loads is difficult. Theoretically, the rotation angle response can be calculated by integrating the angular velocity, but for field measurements of actual in-service bridges, estimating the necessary boundary conditions would be difficult due to traffic-induced vibration. To solve the problem, this paper proposes a method for determining the rotation angle response of an in-service bridge from its angular velocity, as measured by a inertial measurement unit (IMU). To verify our proposed method, field measurements were conducted using nine micro-electrical mechanical systems (MEMS) IMUs and two contact displacement gauges. The results showed that our proposed method provided high accuracy when compared to the reference responses calculated by the contact displacement gauges. PMID:27834871

  6. Polymeric salt bridges for conducting electric current in microfluidic devices

    DOEpatents

    Shepodd, Timothy J [Livermore, CA; Tichenor, Mark S [San Diego, CA; Artau, Alexander [Humacao, PR

    2009-11-17

    A "cast-in-place" monolithic microporous polymer salt bridge for conducting electrical current in microfluidic devices, and methods for manufacture thereof is disclosed. Polymeric salt bridges are formed in place in capillaries or microchannels. Formulations are prepared with monomer, suitable cross-linkers, solvent, and a thermal or radiation responsive initiator. The formulation is placed in a desired location and then suitable radiation such as UV light is used to polymerize the salt bridge within a desired structural location. Embodiments are provided wherein the polymeric salt bridges have sufficient porosity to allow ionic migration without bulk flow of solvents therethrough. The salt bridges form barriers that seal against fluid pressures in excess of 5000 pounds per square inch. The salt bridges can be formulated for carriage of suitable amperage at a desired voltage, and thus microfluidic devices using such salt bridges can be specifically constructed to meet selected analytical requirements.

  7. 1. Photocopied January 1973 from the Keystone Bridge Company Album, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopied January 1973 from the Keystone Bridge Company Album, 1874. THE KEYSTONE BRIDGE COMPANY: LUCY FURNACE. - Baltimore & Ohio Railroad, Parkersburg Bridge, Ohio River, Parkersburg, Wood County, WV

  8. Chickamauga National Military Park Tour Roads, Gordon's Slough Bridge, At ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Chickamauga National Military Park Tour Roads, Gordon's Slough Bridge, At the confluence of Alexander's Bridge Road and Gordon's Slough, southeast of Alexander's Bridge, Fort Oglethorpe, Catoosa County, GA

  9. Implementing HPC on the Sunshine Bridge project

    DOT National Transportation Integrated Search

    2007-11-01

    This report presents the research work from a pilot program regarding the feasibility of implementing high performance concrete on Arizona bridge decks, using the Sunshine Bridge in Holbrook, Arizona as a test case. An existing concrete slab was remo...

  10. Implementing HPC on the Sunshine Bridge Project

    DOT National Transportation Integrated Search

    2007-11-16

    This report presents the research work from a pilot program regarding the feasibility of implementing high performance concrete on Arizona bridge decks, using the Sunshine Bridge in Holbrook, Arizona as a test case. An existing concrete slab was remo...

  11. ChemEd Bridges: Building Bridges between Two-Year College Chemistry Faculty and the National Chemical Education Community

    ERIC Educational Resources Information Center

    Ungar, Harry; Brown, David R.

    2010-01-01

    ChemEd Bridges is an NSF-funded project that provides career and professional development opportunities for chemistry faculty members who teach at two-year colleges (2YCs). We broaden the interests and the horizons of these faculty members by building bridges between them and the broader community of chemical educators. In particular, we have…

  12. Error Sources in Proccessing LIDAR Based Bridge Inspection

    NASA Astrophysics Data System (ADS)

    Bian, H.; Chen, S. E.; Liu, W.

    2017-09-01

    Bridge inspection is a critical task in infrastructure management and is facing unprecedented challenges after a series of bridge failures. The prevailing visual inspection was insufficient in providing reliable and quantitative bridge information although a systematic quality management framework was built to ensure visual bridge inspection data quality to minimize errors during the inspection process. The LiDAR based remote sensing is recommended as an effective tool in overcoming some of the disadvantages of visual inspection. In order to evaluate the potential of applying this technology in bridge inspection, some of the error sources in LiDAR based bridge inspection are analysed. The scanning angle variance in field data collection and the different algorithm design in scanning data processing are the found factors that will introduce errors into inspection results. Besides studying the errors sources, advanced considerations should be placed on improving the inspection data quality, and statistical analysis might be employed to evaluate inspection operation process that contains a series of uncertain factors in the future. Overall, the development of a reliable bridge inspection system requires not only the improvement of data processing algorithms, but also systematic considerations to mitigate possible errors in the entire inspection workflow. If LiDAR or some other technology can be accepted as a supplement for visual inspection, the current quality management framework will be modified or redesigned, and this would be as urgent as the refine of inspection techniques.

  13. Bridge Suture for Successful McDonald Emergency Cerclage.

    PubMed

    Tanaka, Masaaki; Hori, Yoshiaki; Shirafuji, Aya; Kato, Mitsunori; Kato, Jyun; Kobayashi, Hiroto; Tsuchida, Toru; Fukae, Tsukasa

    2017-01-01

    To create awareness about a surgical technique termed bridge suture, which is performed as a pretreatment before a McDonald cerclage is performed on an emergency to treat severe cervical insufficiency. Procedures for bridge suture were reviewed in detail and outcomes of 16 patients treated with bridge suture followed by McDonald cerclage were evaluated retrospectively. Using the bridge suture, the edges of uterine cervix were temporarily sutured and the external uterine os was closed, while the hourglass-shaped fetal membranes were concomitantly confined within the cervix; subsequently, a McDonald cerclage was performed. Over a 22-year period, 16 patients with a dilated cervix and bulging fetal membranes were treated using the technique of bridge suture followed by an emergency cerclage. The mean gestational age at cerclage was 22.5 weeks; the mean gestational age at delivery was 30.7 weeks; and the mean interval between cerclage and delivery was 8.2 weeks. In 15 out of 16 cases, cerclage was performed without encountering any complications. No maternal complications, including cervical laceration, were observed. The mean body weight of 17 neonates, including that of a twin, was 1,516 g and of them, 15 neonates survived. The important outcome of bridge suture is the replacement of fetal membranes back into the uterine cavity before McDonald's cerclage is performed. Pretreatment with bridge suture may facilitate the performance of a successful emergency cerclage and contribute to good maternal and neonatal outcomes. © 2016 S. Karger AG, Basel.

  14. Bivariate Gaussian bridges: directional factorization of diffusion in Brownian bridge models.

    PubMed

    Kranstauber, Bart; Safi, Kamran; Bartumeus, Frederic

    2014-01-01

    In recent years high resolution animal tracking data has become the standard in movement ecology. The Brownian Bridge Movement Model (BBMM) is a widely adopted approach to describe animal space use from such high resolution tracks. One of the underlying assumptions of the BBMM is isotropic diffusive motion between consecutive locations, i.e. invariant with respect to the direction. Here we propose to relax this often unrealistic assumption by separating the Brownian motion variance into two directional components, one parallel and one orthogonal to the direction of the motion. Our new model, the Bivariate Gaussian bridge (BGB), tracks movement heterogeneity across time. Using the BGB and identifying directed and non-directed movement within a trajectory resulted in more accurate utilisation distributions compared to dynamic Brownian bridges, especially for trajectories with a non-isotropic diffusion, such as directed movement or Lévy like movements. We evaluated our model with simulated trajectories and observed tracks, demonstrating that the improvement of our model scales with the directional correlation of a correlated random walk. We find that many of the animal trajectories do not adhere to the assumptions of the BBMM. The proposed model improves accuracy when describing the space use both in simulated correlated random walks as well as observed animal tracks. Our novel approach is implemented and available within the "move" package for R.

  15. Research notes : monitoring the health of bridges.

    DOT National Transportation Integrated Search

    2006-02-01

    Research at Oregon State University has provided ODOT with better analytical tools for determining the safe load capacity of the cracked bridges. ODOT personnel now know that cracks alone do not necessarily mean that a bridge must be replaced. Method...

  16. Integral bridge abutment-to-approach slab connection.

    DOT National Transportation Integrated Search

    2008-06-01

    The Iowa Department of Transportation has long recognized that approach slab pavements of integral abutment bridges are prone to settlement and cracking, which manifests as the "bump at the end of the bridge". A commonly recommended solution is to in...

  17. Investigations of a precast bridge deck system.

    DOT National Transportation Integrated Search

    2010-07-01

    Improved methods of bridge deck construction are greatly needed. Bridge decks are often the first element to require repair or replacement because of its direct exposure to the elements and tire wear. This report presents a new precast overhang syste...

  18. Research notes : washing bridges to reduce corrosion.

    DOT National Transportation Integrated Search

    2003-12-01

    Reinforced concrete bridges on Oregons coast are exposed to chloride ions from marine salt that penetrate into the concrete and cause the reinforcing steel to corrode. The corrosion causes the concrete to spall from the bridge and also reduces the...

  19. Fiber reinforced polymer bridge decks : [technical summary].

    DOT National Transportation Integrated Search

    2011-01-01

    A number of researchers have addressed the use of Fiber Reinforced Polymer (FRP) deck as a replacement solution for deteriorated bridge decks made of traditional materials. The use of new, advanced materials such as FRP is advantageous when the bridg...

  20. Methods for removing concrete decks from bridge girders : [tech transfer summary].

    DOT National Transportation Integrated Search

    2014-08-01

    Although bridges are typically designed to last for 75 years (AWS 2012), : bridge decks deteriorate at a faster rate (Flowers et al. 2010). Full-depth : replacement of bridge decks that can be performed without replacing the : bridge superstructures ...

  1. Natural canopy bridges effectively mitigate tropical forest fragmentation for arboreal mammals.

    PubMed

    Gregory, Tremaine; Carrasco-Rueda, Farah; Alonso, Alfonso; Kolowski, Joseph; Deichmann, Jessica L

    2017-06-20

    Linear infrastructure development and resulting habitat fragmentation are expanding in Neotropical forests, and arboreal mammals may be disproportionately impacted by these linear habitat clearings. Maintaining canopy connectivity through preservation of connecting branches (i.e. natural canopy bridges) may help mitigate that impact. Using camera traps, we evaluated crossing rates of a pipeline right-of-way in a control area with no bridges and in a test area where 13 bridges were left by the pipeline construction company. Monitoring all canopy crossing points for a year (7,102 canopy camera nights), we confirmed bridge use by 25 mammal species from 12 families. With bridge use beginning immediately after exposure and increasing over time, use rates were over two orders of magnitude higher than on the ground. We also found a positive relationship between a bridge's use rate and the number of species that used it, suggesting well-used bridges benefit multiple species. Data suggest bridge use may be related to a combination of bridge branch connectivity, multiple connections, connectivity to adjacent forest, and foliage cover. Given the high use rate and minimal cost, we recommend all linear infrastructure projects in forests with arboreal mammal populations include canopy bridges.

  2. Information-theoretical noninvasive damage detection in bridge structures

    NASA Astrophysics Data System (ADS)

    Sudu Ambegedara, Amila; Sun, Jie; Janoyan, Kerop; Bollt, Erik

    2016-11-01

    Damage detection of mechanical structures such as bridges is an important research problem in civil engineering. Using spatially distributed sensor time series data collected from a recent experiment on a local bridge in Upper State New York, we study noninvasive damage detection using information-theoretical methods. Several findings are in order. First, the time series data, which represent accelerations measured at the sensors, more closely follow Laplace distribution than normal distribution, allowing us to develop parameter estimators for various information-theoretic measures such as entropy and mutual information. Second, as damage is introduced by the removal of bolts of the first diaphragm connection, the interaction between spatially nearby sensors as measured by mutual information becomes weaker, suggesting that the bridge is "loosened." Finally, using a proposed optimal mutual information interaction procedure to prune away indirect interactions, we found that the primary direction of interaction or influence aligns with the traffic direction on the bridge even after damaging the bridge.

  3. Wind-Driven Formation of Ice Bridges in Straits.

    PubMed

    Rallabandi, Bhargav; Zheng, Zhong; Winton, Michael; Stone, Howard A

    2017-03-24

    Ice bridges are static structures composed of tightly packed sea ice that can form during the course of its flow through a narrow strait. Despite their important role in local ecology and climate, the formation and breakup of ice bridges is not well understood and has proved difficult to predict. Using long-wave approximations and a continuum description of sea ice dynamics, we develop a one-dimensional theory for the wind-driven formation of ice bridges in narrow straits, which is verified against direct numerical simulations. We show that for a given wind stress and minimum and maximum channel widths, a steady-state ice bridge can only form beyond a critical value of the thickness and the compactness of the ice field. The theory also makes quantitative predictions for ice fluxes, which are particularly useful to estimate the ice export associated with the breakup of ice bridges. We note that similar ideas are applicable to dense granular flows in confined geometries.

  4. 1. Elkmont vehicle bridge at Elkmont Campground, galvanized corrugated arch. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Elkmont vehicle bridge at Elkmont Campground, galvanized corrugated arch. - Great Smoky Mountains National Park Roads & Bridges, Elkmont Vehicle Bridge, Spanning Little River at Elkmont Campground, Gatlinburg, Sevier County, TN

  5. VIEW NORTH, SHOWING SOUTH END OF BRIDGE LOOKING TOWARD VAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW NORTH, SHOWING SOUTH END OF BRIDGE LOOKING TOWARD VAN BUREN TOWNSHIP - Belleville Road Bridge, Spanning the Flat River at Burroughs Drive (replaced Burroughs Street Bridge), Lowell, Kent County, MI

  6. 20. BLUEPRINT, RR BRIDGE MISSISSIPPI, CLAY CO., WAVERLY L.% MI. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. BLUEPRINT, RR BRIDGE MISSISSIPPI, CLAY CO., WAVERLY L.% MI. S of MS. 50 Proposed bridge, by Phoenis Bridge Co., Phoenixville, Pa. 218-foot turn span, with load bearing. 21 May 1914. Act. size: 16X35 in. Credit: Columbus and Greenville RR, Columbus, Ms. Sarcone Photography, Columbus, Ms. Sept 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  7. 46 CFR 112.43-7 - Navigating bridge distribution panel.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Navigating bridge distribution panel. 112.43-7 Section... EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-7 Navigating bridge distribution... supplied from a distribution panel on the navigating bridge: (1) Navigation lights not supplied by the...

  8. 29 CFR 1917.124 - Dockboards (car and bridge plates).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Dockboards (car and bridge plates). 1917.124 Section 1917..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Terminal Facilities § 1917.124 Dockboards (car and bridge... and across openings. (b) [Reserved] (c) Dockboards (car and bridge plates). (1) Dockboards shall be...

  9. 29 CFR 1917.124 - Dockboards (car and bridge plates).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Dockboards (car and bridge plates). 1917.124 Section 1917..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Terminal Facilities § 1917.124 Dockboards (car and bridge... and across openings. (b) [Reserved] (c) Dockboards (car and bridge plates). (1) Dockboards shall be...

  10. 29 CFR 1917.124 - Dockboards (car and bridge plates).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Dockboards (car and bridge plates). 1917.124 Section 1917..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Terminal Facilities § 1917.124 Dockboards (car and bridge... and across openings. (b) [Reserved] (c) Dockboards (car and bridge plates). (1) Dockboards shall be...

  11. 29 CFR 1917.124 - Dockboards (car and bridge plates).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Dockboards (car and bridge plates). 1917.124 Section 1917..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Terminal Facilities § 1917.124 Dockboards (car and bridge... and across openings. (b) [Reserved] (c) Dockboards (car and bridge plates). (1) Dockboards shall be...

  12. 29 CFR 1917.124 - Dockboards (car and bridge plates).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Dockboards (car and bridge plates). 1917.124 Section 1917..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Terminal Facilities § 1917.124 Dockboards (car and bridge... and across openings. (b) [Reserved] (c) Dockboards (car and bridge plates). (1) Dockboards shall be...

  13. Monitoring bridge scour using fiber optic sensors : [tech summary].

    DOT National Transportation Integrated Search

    2015-04-01

    It is well known that scour is one of the major causes of bridge failures. In the last 30 years, more than 1,000 bridges collapsed in : the US and about 60% of the failures are related to the scour of bridges foundations. Due to the difficulty in ...

  14. 46 CFR 112.43-7 - Navigating bridge distribution panel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Navigating bridge distribution panel. 112.43-7 Section... EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-7 Navigating bridge distribution... supplied from a distribution panel on the navigating bridge: (1) Navigation lights not supplied by the...

  15. Monitoring Bridge Dynamic Responses Using Fiber Bragg Grating Tiltmeters.

    PubMed

    Xiao, Feng; Chen, Gang S; Hulsey, J Leroy

    2017-10-20

    In bridge health monitoring, tiltmeters have been used for measuring rotation and curvature; however, their application in dynamic parameter identification has been lacking. This study installed fiber Bragg grating (FBG) tiltmeters on the bearings of a bridge and monitored the dynamic rotational angle. The dynamic features, including natural frequencies and mode shapes, have been identified successfully. The innovation presented in this paper is the first-time use of FBG tiltmeter readings to identify the natural frequencies of a long-span steel girder bridge. The identified results have been verified using a bridge finite element model. This paper introduces a new method for the dynamic monitoring of a bridge using FBG tiltmeters. Limitations and future research directions are also discussed in the conclusion.

  16. Identification of Vehicle Axle Loads from Bridge Dynamic Responses

    NASA Astrophysics Data System (ADS)

    ZHU, X. Q.; LAW, S. S.

    2000-09-01

    A method is presented to identify moving loads on a bridge deck modelled as an orthotropic rectangular plate. The dynamic behavior of the bridge deck under moving loads is analyzed using the orthotropic plate theory and modal superposition principle, and Tikhonov regularization procedure is applied to provide bounds to the identified forces in the time domain. The identified results using a beam model and a plate model of the bridge deck are compared, and the conditions under which the bridge deck can be simplified as an equivalent beam model are discussed. Computation simulation and laboratory tests show the effectiveness and the validity of the proposed method in identifying forces travelling along the central line or at an eccentric path on the bridge deck.

  17. Rural roads and bridges : condition and financing of local bridges

    DOT National Transportation Integrated Search

    1996-09-01

    This report examines the condition of rural county and town bridges across the United States, with comparisons based on two data sets. The first is the results of surveys mailed to highway administrators in 2321 counties and 9064 towns in Fall 1994 a...

  18. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  19. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  20. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  1. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  2. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  3. A loading study of older highway bridges in Virginia. Pt. 3, Concrete tee-beam bridge in Nelson County.

    DOT National Transportation Integrated Search

    1977-01-01

    A 40-foot clear span, standard reinforced tee-beam bridge over the Tye River in Nelson County was tested with a 23-ton, tandem axle test vehicle in July 1976. The test span was one of four identical spans making a total bridge length of 170 feet. Str...

  4. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the...

  5. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the...

  6. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the...

  7. Precast concrete replacement slabs for bridge decks.

    DOT National Transportation Integrated Search

    1982-01-01

    The report illustrates and evaluates the first use in Virginia of precast concrete replacement slabs for bridge decks. It shows that a bridge deck can be replaced with the precast slabs while traffic is maintained in the adjacent traffic lane. The qu...

  8. Hybrid FRP-concrete bridge deck system final report II : long term performance of hybrid FRP-concrete bridge deck system.

    DOT National Transportation Integrated Search

    2009-06-01

    This report describes the investigation of the long term structural performance of a : hybrid FRP-concrete (HFRPC) bridge deck on steel girders. The study aimed at : assessing three long term aspects pertaining to the HFRPC bridge deck: (1) creep : c...

  9. 5. View showing Crooked River High Bridge in background and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. View showing Crooked River High Bridge in background and Ralph Modjeski railroad bridge in foreground - Crooked River High Bridge, Spanning Crooked River Gorge at Dalles-California Highway, Terrebonne, Deschutes County, OR

  10. 5. HISTORIC VIEW LOOKING FROM PENNSYLVANIA AVENUE BRIDGE SOUTH TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. HISTORIC VIEW LOOKING FROM PENNSYLVANIA AVENUE BRIDGE SOUTH TO OLD (1907 STEEL-GIRDER) K STREET BRIDGE. MLK LIBRARY. - K Street Bridge, Spanning Rock Creek & Potomac Parkway, Washington, District of Columbia, DC

  11. Elevation, west portal. Sign on portal reads Watson Mill Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Elevation, west portal. Sign on portal reads Watson Mill Bridge, est. 1885. - Watson Mill Bridge, Spanning South Fork Broad River, Watson Mill Road, Watson Mill Bridge State Park, Comer, Madison County, GA

  12. Observing Bridge Dynamic Deflection in Green Time by Information Technology

    NASA Astrophysics Data System (ADS)

    Yu, Chengxin; Zhang, Guojian; Zhao, Yongqian; Chen, Mingzhi

    2018-01-01

    As traditional surveying methods are limited to observe bridge dynamic deflection; information technology is adopted to observe bridge dynamic deflection in Green time. Information technology used in this study means that we use digital cameras to photograph the bridge in red time as a zero image. Then, a series of successive images are photographed in green time. Deformation point targets are identified and located by Hough transform. With reference to the control points, the deformation values of these deformation points are obtained by differencing the successive images with a zero image, respectively. Results show that the average measurement accuracies of C0 are 0.46 pixels, 0.51 pixels and 0.74 pixels in X, Z and comprehensive direction. The average measurement accuracies of C1 are 0.43 pixels, 0.43 pixels and 0.67 pixels in X, Z and comprehensive direction in these tests. The maximal bridge deflection is 44.16mm, which is less than 75mm (Bridge deflection tolerance value). Information technology in this paper can monitor bridge dynamic deflection and depict deflection trend curves of the bridge in real time. It can provide data support for the site decisions to the bridge structure safety.

  13. 33 CFR 118.100 - Retroreflective panels on bridge piers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... six inches square. If the visibility required is more than one-half mile, the panels must be at least 12 inches square. (c) To mark bridge piers or channel sides on bridges not required to have bridge lighting. Lateral significant red triangles and green square retroreflective panels shall be used. The...

  14. 33 CFR 118.100 - Retroreflective panels on bridge piers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... six inches square. If the visibility required is more than one-half mile, the panels must be at least 12 inches square. (c) To mark bridge piers or channel sides on bridges not required to have bridge lighting. Lateral significant red triangles and green square retroreflective panels shall be used. The...

  15. 33 CFR 118.100 - Retroreflective panels on bridge piers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... six inches square. If the visibility required is more than one-half mile, the panels must be at least 12 inches square. (c) To mark bridge piers or channel sides on bridges not required to have bridge lighting. Lateral significant red triangles and green square retroreflective panels shall be used. The...

  16. 33 CFR 118.100 - Retroreflective panels on bridge piers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... six inches square. If the visibility required is more than one-half mile, the panels must be at least 12 inches square. (c) To mark bridge piers or channel sides on bridges not required to have bridge lighting. Lateral significant red triangles and green square retroreflective panels shall be used. The...

  17. 33 CFR 118.100 - Retroreflective panels on bridge piers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... six inches square. If the visibility required is more than one-half mile, the panels must be at least 12 inches square. (c) To mark bridge piers or channel sides on bridges not required to have bridge lighting. Lateral significant red triangles and green square retroreflective panels shall be used. The...

  18. Use and selection of bridges as day roosts by Rafinesque's Big Eared Bats.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennett, Frances, M.; Loeb, Susan, C.; Bunch, Mary, S.

    ABSTRACT.—Rafinesque’s big-eared bats (Corynorhinus rafinesquii) use bridges as day roosts in parts of their range, but information on bridge use across their range is lacking. From May to Aug. 2002 we surveyed 1129 bridges (12.5%) within all 46 counties of South Carolina to determine use and selection of bridges as day roosts by big-eared bats and to document their distribution across the state. During summer 2003, we visited 235 bridges in previously occupied areas of the state to evaluate short-term fidelity to bridge roosts. We found colonies and solitary big-eared bats beneath 38 bridges in 2002 and 54 bridges inmore » 2003. Construction type and size of bridges strongly influenced use in both years; bats selected large, concrete girder bridges and avoided flat-bottomed slab bridges. The majority of occupied bridges (94.7%) were in the Upper and Lower Coastal Plains, but a few bridges (5.3%) were located in the Piedmont. Rafinesque’s big-eared bats were absent beneath bridges in the Blue Ridge Mountains. We established new records of occurrence for 10 counties. In the Coastal Plains, big-eared bats exhibited a high degree of short-term fidelity to roosts in highway bridges. For bridges that were occupied at least once, mean frequency of use was 65.9%. Probability of finding bats under a bridge ranged from 0.46 to 0.73 depending on whether the bridge was occupied in the previous year. Thus, bridges should be inspected three to five times in a given year to determine whether they are being used. Regional bridge roost surveys may be a good method for determining the distribution of C. rafinesquii, particularly in the Coastal Plains, and protection of suitable bridges may be a viable conservation strategy where natural roost sites are limited.« less

  19. Dynamic response for structural health monitoring of the Penang (I) cable-stayed bridge

    NASA Astrophysics Data System (ADS)

    Mohammed, M. I.; Sulaeman, E.; Mustapha, F.

    2017-03-01

    The paper discusses the dynamic response of the Penang (I) cable stayed bridge structure under various moving load representing typical traffic load of the bridge. The bridge has a total span of 440 m excluding the transition bridge that assumed to be not connected structurally to the main bridge structure. The bridge that links the fast growing Pinang Island and the Malaysian Mainland Peninsula has been known to be fully utilized which leads to the construction of Penang (II) bridge and now the third one. Due to highly traffic use of the bridge that may lead to reduction of the bridge design life, the dynamic response of the bridge becomes important to predict critical part of the bridge structure elements including the main girder and the 144 stay cables. The present study reveals that, due to flexible nature of the cable stayed bridge, the moving load that interacts with the natural dynamic characteristics of the bridge, gives significant stress increment compare to proportional static load especially when the moving load is un-symmetric. For this reason, several classes of typical vehicle passing the bridge with various vehicle speeds are investigated to demonstrate their effect on the bridge displacement, internal forces and stresses. The results can be used for further fatigue assessment of the bridge.

  20. Ileostomy rod--is it a bridge too far?

    PubMed

    Speirs, M; Leung, E; Hughes, D; Robertson, I; Donnelly, L; Mackenzie, I; Macdonald, A

    2006-07-01

    Defunctioning loop ileostomies are used commonly to protect low colorectal anastomoses and thereby reducing the serious complications of leakage. However, they are associated with specific complications such as retraction. Traditionally, a supporting rod is placed as a bridge to support both limbs of the stoma in the hope of reducing the incidence of stomal retraction. There is little evidence in the published literature to support this practice. The aim of this study was to determine whether using an ileostomy rod would reduce the incidence of stomal retraction. A prospective, randomised controlled trial was performed in 60 consecutive patients who required a defunctioning loop ileostomy. Patients were allocated to either a 'bridge' or 'bridge-less' protocol. All the patients were assessed by dedicated stoma nurses for at least 3 months and until their stomas were closed. Their postoperative symptoms, including stoma activity and retraction rate, were recorded. Between May 2001 and June 2004, 57 patients completed the study (28 bridge; 29 bridge-less). There were no significant differences in the retraction rate between the groups. No clinical anastomotic leakage was recorded and none of the patients required early closure. If a loop ileostomy is constructed properly, stomal retraction is uncommon and routine use of a bridge is unnecessary.