Sample records for junction projects office

  1. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  2. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedialmore » action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.« less

  3. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  4. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  5. Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1995-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate themore » facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.« less

  6. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  7. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soilmore » beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  8. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soilmore » beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  9. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  10. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial actionmore » contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  11. 75 FR 5757 - Notice of Availability of Final Environmental Assessment and Finding of No Significant Impact for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ..., Delta Junction, AK AGENCY: Alaska State Office, Natural Resources Conservation Service, USDA. ACTION..., the State Conservationist (Alaska) found that the project would not result in a significant impact on... Service, Palmer State Office, 800 West Evergreen, Suite 100, Palmer, AK 99645. 2. Natural Resources...

  12. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. Themore » DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.« less

  13. 76 FR 64134 - Post Office Closing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... POSTAL REGULATORY COMMISSION [Docket No. A2012-5; Order No. 901] Post Office Closing AGENCY... the closing of the Conception Junction, Missouri post office has been filed. It identifies preliminary... Postal Service's determination to close the Conception Junction post office in Conception Junction...

  14. 78 FR 57874 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-38] Federal Property Suitable as... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room... more info. Washington Dry Falls Junction; Cafe Columbia Basin Project Ephrata Field Office Coulee City...

  15. A multiyear quality control study of alpha-track radon monitors.

    PubMed

    Pearson, M D; Martz, D E; George, J L; Langner, G H

    1992-01-01

    Quality control exposures of commercial alpha-track radon monitors have been conducted approximately weekly at the U.S. Department of Energy (DOE) Grand Junction Projects Office since early 1987 in support of DOE remedial action programs. The results of these exposures provide a historical record of the comparative performances of these radon monitors.

  16. Alaska Department of Natural Resources

    Science.gov Websites

    , Fairbanks, Alaska 99709 Phone: 907-822-5534, Fax: 907-451-2690 Delta Area Office PO Box 1149, Delta Junction Fairbanks Office 3700 Airport Way, Fairbanks, AK 99709-4613 Phone: 907-451-2695, Fax: 907-451-2754 Delta Junction Office PO Box 318, Delta Junction, AK 99737 Phone: 907-895-2113, Fax: 907-895-5043 Southeast

  17. Cryogenic Memories based on Spin-Singlet and Spin-Triplet Ferromagnetic Josephson Junctions

    NASA Astrophysics Data System (ADS)

    Gingrich, Eric

    The last several decades have seen an explosion in the use and size of computers for scientific applications. The US Department of Energy has set an ExaScale computing goal for high performance computing that is projected to be unattainable by current CMOS computing designs. This has led to a renewed interest in superconducting computing as a means of beating these projections. One of the primary requirements of this thrust is the development of an efficient cryogenic memory. Estimates of power consumption of early Rapid Single Flux Quantum (RSFQ) memory designs are on the order of MW, far too steep for any real application. Therefore, other memory concepts are required. S/F/S Josephson Junctions, a class of device in which two superconductors (S) are separated by one or more ferromagnetic layers (F) has shown promise as a memory element. Several different systems have been proposed utilizing either the spin-singlet or spin-triplet superconducting states. This talk will discuss the concepts underpinning these devices, and the recent work done to demonstrate their feasibility. This research is supported in part by the Office of the Director of National Intelligence (ODNI), Intelligence Advanced Research Projects Activity (IARPA), via U.S. Army Research Office Contract W911NF-14-C-0115.

  18. 75 FR 57024 - Decision To Evaluate a Petition To Designate a Class of Employees From the Grand Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ...: Grand Junction Operations Office. Location: Grand Junction, Colorado. Job Titles and/or Job Duties: All..., Division of Compensation Analysis and Support, National Institute for Occupational Safety and Health (NIOSH...

  19. 75 FR 8990 - Notice of Public Meeting, Northwest Colorado Resource Advisory Council Subgroup for McInnis...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... Land Management Grand Junction Field Office at 2815 H Road, Grand Junction, CO 81506. The meeting will... Conservation Area Manager, 2815 H Road, Grand Junction, CO; telephone 970-244-3049; or Erin Curtis, Public Affairs Specialist, 2815 H Road, Grand Junction, CO, telephone 970-244-3097. SUPPLEMENTARY INFORMATION...

  20. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... on Sunrise Project, I-205 to Rock Creek Junction: Clackamas County, OR AGENCY: Federal Highway.... 139(l)(1). The actions relate to a proposed highway project, Sunrise Project, I-205 to Rock Creek... Project, I-205 to Rock Creek Junction Final Environmental Impact Statement, Record of Decision and other...

  1. 78 FR 25096 - Call for Nominations for the Dominguez-Escalante National Conservation Area Advisory Council...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ..., Grand Junction, CO 81506. Nomination forms may be obtained at the Grand Junction Field Office at the above address, at the BLM Uncompahgre Field Office, 2465 S. Townsend Ave, Montrose, CO 81401, or online at http://www.blm.gov/co/st/en/nca/denca/denca_rmp/DENCA_Resource_Advisory_Council.html . FOR FURTHER...

  2. 75 FR 27944 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ...; State of California; PM-10; Determination of Attainment for the Coso Junction Nonattainment Area... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing its determination that the Coso Junction... Officer, GBUAPCD, to Doris Lo, Environmental Protection Specialist, EPA, with CosoJunction2010--MetAndTEOM...

  3. Radon/radon daughter environmental chamber located in the northwest end of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Radon/radon daughter environmental chamber located in the northwest end of building. VIEW LOOKING WEST - Department of Energy, Grand Junction Office, Building No. 32, 2597 B3/4 Road, Grand Junction, Mesa County, CO

  4. 5. Oblique view of center and south sections of building. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Oblique view of center and south sections of building. VIEW OF NORTHWEST CORNER OF CENTER SECTION. - Department of Energy, Grand Junction Office, Building No. 3022, 2597 B3/4 Road, Grand Junction, Mesa County, CO

  5. INTEGRIN-MEDIATED CELL ATTACHMENT SHOWS TIME-DEPENDENT UPREGULATION OF GAP JUNCTION COMMUNICATION.

    EPA Science Inventory


    Integrin-mediated Cell Attachment Shows Time-Dependent Upregulation of Gap Junction
    Communication

    Rachel Grindstaff and Carl Blackman, National Health & Environmental Effects Research
    Laboratory, Office of Research and Development, US EPA, Research Triang...

  6. Modeling the Project Capacity of the Sacramento District Army Corps of Engineers

    DTIC Science & Technology

    2011-06-01

    District. Added were all of Utah, except the southwest corner, Colorado from the Continental Divide west, the southwest corner of Wyoming, northeast corner...Sacramento 2011). 3 !. !. !. !. !. !. ^̀ Redding Reno St. George Bountiful Grand Junction Durango O r e g o n I d a h o W y o m i n gi C o l o r a d oU t a...114°W 114°W 123°W 123°W 42°N 42°N 34°N 34°N Legend Colorado West BranchCalifornia North Branch California Delta Branch ^̀ District Office District

  7. Radiologic characterization of the Mexican Hat, Utah, uranium mill tailings remedial action site: Appendix D, Addenda D1--D7

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ludlam, J.R.

    1985-01-01

    This radiologic characterization of the inactive uranium millsite at Mexican Hat, Utah, was conducted by Bendix Field Engineering Corporation foe the US Department of Energy (DOE), Grand Junction Project Office, in response to and in accord with a Statement of Work prepared by the DOE Uranium Mill tailings Remedial Action Project (UMTRAP) Technical Assistance Contractor, Jacobs Engineering Group, Inc. the objective of this project was to determine the horizontal and vertical extent of contamination that exceeds the US Environmental Protection Agency (EPA) standards at the Mexican Hat site. The data presented in this report are required for characterization of themore » areas adjacent to the Mexican Hat tailings piles and for the subsequent design of cleanup activities. Some on-pile sampling was required to determine the depth of the 15-pCi/g Ra-226 interface in an area where wind and water erosion has taken place.« less

  8. Design and measurement of improved capacitively-shunted flux qubits

    NASA Astrophysics Data System (ADS)

    Sears, Adam; Birenbaum, Jeffrey; Hover, David; Gudmundsen, Theodore; Kerman, Andrew; Welander, Paul; Yoder, Jonilyn L.; Gustavsson, Simon; Jin, Xiaoyue; Kamal, Archana; Clarke, John; Oliver, William

    2014-03-01

    The addition of a capacitive or inductive shunt across one of the junctions can alter the coherence properties of a classic flux or RF-SQUID qubit. We have studied the performance of capacitively shunted flux qubits fabricated with MBE aluminum, starting from a 2D coplanar waveguide geometry used in similar high-performance transmon qubits, and measured dispersively. We will detail the importance of design parameters that preserve the flux qubit's anharmonicity and discuss conclusions about materials quality based on calculations of the participation of junction, dielectric, and superconductor components. This research was funded in part by the Office of the Director of National Intelligence (ODNI), Intelligence Advanced Research Projects Activity (IARPA); and by the Assistant Secretary of Defense for Research & Engineering under Air Force Contract number FA8721-05-C-0002. All statements of fact, opinion or conclusions contained herein are those of the authors and should not be construed as representing the official views or policies of IARPA, the ODNI, or the U.S. Government Present address: SLAC National Accelerator Laboratory, Menlo Park, CA.

  9. Geological and geochemical aspects of uranium deposits: a selected, annotated bibliography. [474 references

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, J.M.; Garland, P.A.; White, M.B.

    This bibliography, a compilation of 474 references, is the fourth in a series compiled from the National Uranium Resource Evaluation (NURE) Bibliographic Data Base. This data base was created for the Grand Junction Office of the Department of Energy's National Uranium Resource Evaluation Project by the Ecological Sciences Information Center, Oak Ridge National Laboratory. The references in the bibliography are arranged by subject category: (1) geochemistry, (2) exploration, (3) mineralogy, (4) genesis of deposits, (5) geology of deposits, (6) uranium industry, (7) geology of potential uranium-bearing areas, and (8) reserves and resources. The references are indexed by author, geographic location,more » quadrangle name, geoformational feature, and keyword.« less

  10. 75 FR 3467 - Ocean Transportation Intermediary License; Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    .../Secretary/ Treasurer. (Qualifying Individual) EB Logistics, LLC, 300 Colonial Center Parkway, Suite 100.... (Qualifying Individual) Tri-Vi-U.S. Logistics Ltd., 147-35 Farmers Blvd., Jamaica, NY 11434, Officers: Yehudit... Logistics LLC, 6 Emerald Court, Princeton Junction, NJ 08550, Yongpeng Jin, Owner. Officer: (Qualifying...

  11. Helios: Understanding Solar Evolution Through Text Analytics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Randazzese, Lucien

    This proof-of-concept project focused on developing, testing, and validating a range of bibliometric, text analytic, and machine-learning based methods to explore the evolution of three photovoltaic (PV) technologies: Cadmium Telluride (CdTe), Dye-Sensitized solar cells (DSSC), and Multi-junction solar cells. The analytical approach to the work was inspired by previous work by the same team to measure and predict the scientific prominence of terms and entities within specific research domains. The goal was to create tools that could assist domain-knowledgeable analysts in investigating the history and path of technological developments in general, with a focus on analyzing step-function changes in performance,more » or “breakthroughs,” in particular. The text-analytics platform developed during this project was dubbed Helios. The project relied on computational methods for analyzing large corpora of technical documents. For this project we ingested technical documents from the following sources into Helios: Thomson Scientific Web of Science (papers), the U.S. Patent & Trademark Office (patents), the U.S. Department of Energy (technical documents), the U.S. National Science Foundation (project funding summaries), and a hand curated set of full-text documents from Thomson Scientific and other sources.« less

  12. 75 FR 61757 - Ocean Transportation Intermediary License Applicants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Cargo Corp. (NVO & OFF), 8430 N.W. 66th Street, Miami, FL 33166. Officers: Karime Zawady, Vice President...), Jinho Um, CFO. Application Type: New NVO & OFF License. Junction Int'l Logistics, Inc. (NVO), 17870 Castleton Street, Suite 107, City of Industry, CA 91748. Officers: Charles Kuo, Secretary (Qualifying...

  13. Multicolor (UV-IR) Photodetectors Based on Lattice-Matched 6.1 A II/VI and III/V Semiconductors

    DTIC Science & Technology

    2015-08-27

    photodiodes with different cutoff wavelengths connected in series with tunnel diodes between adjacent photodiodes. The LEDs optically bias the inactive...perfectly conductive n-CdTe/p-InSb tunnel junction. 15. SUBJECT TERMS optical biasing; multi-junction photodetectors; triple-junction solar cell...during this project, including initial demonstrations of optical addressing, tunnel junction studies and multicolor device characterization

  14. Contact and Length Dependent Effects in Single-Molecule Electronics

    NASA Astrophysics Data System (ADS)

    Hines, Thomas

    Understanding charge transport in single molecules covalently bonded to electrodes is a fundamental goal in the field of molecular electronics. In the past decade, it has become possible to measure charge transport on the single-molecule level using the STM break junction method. Measurements on the single-molecule level shed light on charge transport phenomena which would otherwise be obfuscated by ensemble measurements of groups of molecules. This thesis will discuss three projects carried out using STM break junction. In the first project, the transition between two different charge transport mechanisms is reported in a set of molecular wires. The shortest wires show highly length dependent and temperature invariant conductance behavior, whereas the longer wires show weakly length dependent and temperature dependent behavior. This trend is consistent with a model whereby conduction occurs by coherent tunneling in the shortest wires and by incoherent hopping in the longer wires. Measurements are supported with calculations and the evolution of the molecular junction during the pulling process is investigated. The second project reports controlling the formation of single-molecule junctions by means of electrochemically reducing two axial-diazonium terminal groups on a molecule, thereby producing direct Au-C covalent bonds in-situ between the molecule and gold electrodes. Step length analysis shows that the molecular junction is significantly more stable, and can be pulled over a longer distance than a comparable junction created with amine anchoring bonds. The stability of the junction is explained by the calculated lower binding energy associated with the direct Au-C bond compared with the Au-N bond. Finally, the third project investigates the role that molecular conformation plays in the conductance of oligothiophene single-molecule junctions. Ethyl substituted oligothiophenes were measured and found to exhibit temperature dependent conductance and transition voltage for molecules with between two and six repeat units. While the molecule with only one repeat unit shows temperature invariant behavior. Density functional theory calculations show that at higher temperatures the oligomers with multiple repeat units assume a more planar conformation, which increases the conjugation length and decreases the effective energy barrier of the junction.

  15. Spatially inhomogeneous barrier height in graphene/MoS2 Schottky junctions

    NASA Astrophysics Data System (ADS)

    Tomer, Dushyant; Rajput, Shivani; Li, Lian

    Graphene interfaced with a semiconductor forms a Schottky junction with rectifying properties. In this study, graphene Schottky junctions are fabricated by transferring CVD monolayer graphene on mechanically exfoliated MoS2 multilayers. The forward bias current-voltage characteristics are measured in the temperature range of 210-300 K. An increase in the zero bias barrier height and decrease in the ideality factor are observed with increasing temperature. Such behavior is attributed to Schottky barrier inhomogeneities possibly due to graphene ripples and ridges at the junction interface as suggested by atomic force microscopy. Assuming a Gaussian distribution of the barrier height, mean barrier of 0.97+/-0.10 eV is found for the graphene MoS2 junction. Our findings provide significant insight on the barrier height inhomogeneities in graphene/two dimensional semiconductor Schottky junctions. U.S. Department of Energy, Office of Basic Energy Sciences, Division of Materials Sciences and Engineering Award No. DEFG02-07ER46228.

  16. Data Validation Package August 2015 Groundwater Sampling at the Grand Junction, Colorado, Disposal Site October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frazier, William; Baur, Gary

    2015-11-03

    The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.

  17. Geochemical study of groundwater at Sandia National Laboratories/New Mexico and Kirtland Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) and its contractor, Rust Geotech, support the Kirtland Area Office by assisting Sandia National Laboratories/New Mexico (Sandia/NM) with remedial action, remedial design, and technical support of its Environmental Restoration Program. To aid in determining groundwater origins and flow paths, the GJPO was tasked to provide interpretation of groundwater geochemical data. The purpose of this investigation was to describe and analyze the groundwater geochemistry of the Sandia/NM Kirtland Air Force Base (KAFB). Interpretations of groundwater origins are made by using these data and the results of {open_quotes}mass balance{close_quotes} and {open_quotes}reactionmore » path{close_quote} modeling. Additional maps and plots were compiled to more fully comprehend the geochemical distributions. A more complete set of these data representations are provided in the appendices. Previous interpretations of groundwater-flow paths that were based on well-head, geologic, and geochemical data are presented in various reports and were used as the basis for developing the models presented in this investigation.« less

  18. Grand Junction projects office mixed-waste treatment program, VAC*TRAX mobile treatment unit process hazards analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bloom, R.R.

    1996-04-01

    The objective of this report is to demonstrate that a thorough assessment of the risks associated with the operation of the Rust Geotech patented VAC*TRAX mobile treatment unit (MTU) has been performed and documented. The MTU was developed to treat mixed wastes at the US Department of Energy (DOE) Albuquerque Operations Office sites. The MTU uses an indirectly heated, batch vacuum dryer to thermally desorb organic compounds from mixed wastes. This process hazards analysis evaluated 102 potential hazards. The three significant hazards identified involved the inclusion of oxygen in a process that also included an ignition source and fuel. Changesmore » to the design of the MTU were made concurrent with the hazard identification and analysis; all hazards with initial risk rankings of 1 or 2 were reduced to acceptable risk rankings of 3 or 4. The overall risk to any population group from operation of the MTU was determined to be very low; the MTU is classified as a Radiological Facility with low hazards.« less

  19. Progress in the Development of Metamorphic Multi-Junction III-V Space-Solar Cells at Essential Research Incorporated

    NASA Technical Reports Server (NTRS)

    Sinharoy, Samar; Patton, Martin O.; Valko, Thomas M., Sr.; Weizer, Victor G.

    2002-01-01

    Theoretical calculations have shown that highest efficiency III-V multi-junction solar cells require alloy structures that cannot be grown on a lattice-matched substrate. Ever since the first demonstration of high efficiency metamorphic single junction 1.1 eV and 1.2 eV InGaAs solar cells by Essential Research Incorporated (ERI), interest has grown in the development of multi-junction cells of this type using graded buffer layer technology. ERI is currently developing a dual-junction 1.6 eV InGaP/1.1 eV InGaAs tandem cell (projected practical air-mass zero (AM0), one-sun efficiency of 28%, and 100-sun efficiency of 37.5%) under a Ballistic Missile Defense Command (BMDO) SBIR Phase II program. A second ongoing research effort at ERI involves the development of a 2.1 eV AlGaInP/1.6 eV InGaAsP/1.2 eV InGaAs triple-junction concentrator tandem cell (projected practical AM0 efficiency of 36.5% under 100 suns) under a SBIR Phase II program funded by the Air Force. We are in the process of optimizing the dual-junction cell performance. In case of the triple-junction cell, we have developed the bottom and the middle cell, and are in the process of developing the layer structures needed for the top cell. A progress report is presented in this paper.

  20. Electron tomographic analysis of gap junctions in lateral giant fibers of crayfish.

    PubMed

    Ohta, Yasumi; Nishikawa, Kouki; Hiroaki, Yoko; Fujiyoshi, Yoshinori

    2011-07-01

    Innexin-gap junctions in crayfish lateral giant fibers (LGFs) have an important role in escape behavior as a key component of rapid signal transduction. Knowledge of the structure and function of characteristic vesicles on the both sides of the gap junction, however, is limited. We used electron tomography to analyze the three-dimensional structure of crayfish gap junctions and gap junctional vesicles (GJVs). Tomographic analyses showed that some vesicles were anchored to innexons and almost all vesicles were connected by thin filaments. High densities inside the GJVs and projecting densities on the GJV membranes were observed in fixed and stained samples. Because the densities inside synaptic vesicles were dependent on the fixative conditions, different fixative conditions were used to elucidate the molecules included in the GJVs. The projecting densities on the GJVs were studied by immunoelectron microscopy with anti-vesicular monoamine transporter (anti-VMAT) and anti-vesicular nucleotide transporter (anti-VNUT) antibodies. Some of the projecting densities were labeled by anti-VNUT, but not anti-VMAT. Three-dimensional analyses of GJVs and excitatory chemical synaptic vesicles (CSVs) revealed clear differences in their sizes and central densities. Furthermore, the imaging data obtained under different fixative conditions and the immunolabeling results, in which GJVs were positively labeled for anti-VNUT but excitatory CSVs were not, support our model that GJVs contain nucleotides and excitatory CSVs do not. We propose a model in which characteristic GJVs containing nucleotides play an important role in the signal processing in gap junctions of crayfish LGFs. Copyright © 2011 Elsevier Inc. All rights reserved.

  1. High Aspect Ratio Semiconductor Heterojunction Solar Cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Redwing, Joan; Mallouk, Tom; Mayer, Theresa

    2013-05-17

    The project focused on the development of high aspect ratio silicon heterojunction (HARSH) solar cells. The solar cells developed in this study consisted of high density vertical arrays of radial junction silicon microwires/pillars formed on Si substrates. Prior studies have demonstrated that vertical Si wire/pillar arrays enable reduced reflectivity and improved light trapping characteristics compared to planar solar cells. In addition, the radial junction structure offers the possibility of increased carrier collection in solar cells fabricated using material with short carrier diffusion lengths. However, the high junction and surface area of radial junction Si wire/pillar array devices can be problematicmore » and lead to increased diode leakage and enhanced surface recombination. This study investigated the use of amorphous hydrogenated Si in the form of a heterojunction-intrinsic-thin layer (HIT) structure as a junction formation method for these devices. The HIT layer structure has widely been employed to reduce surface recombination in planar crystalline Si solar cells. Consequently, it was anticipated that it would also provide significant benefits to the performance of radial junction Si wire/pillar array devices. The overall goals of the project were to demonstrate a HARSH cell with a HIT-type structure in the radial junction Si wire/pillar array configuration and to develop potentially low cost pathways to fabricate these devices. Our studies demonstrated that the HIT structure lead to significant improvements in the open circuit voltage (V oc>0.5) of radial junction Si pillar array devices compared to devices fabricated using junctions formed by thermal diffusion or low pressure chemical vapor deposition (LPCVD). In addition, our work experimentally demonstrated that the radial junction structure lead to improvements in efficiency compared to comparable planar devices for devices fabricated using heavily doped Si that had reduced carrier diffusion lengths. Furthermore, we made significant advances in employing the bottom-up vapor-liquid-solid (VLS) growth technique for the fabrication of the Si wire arrays. Our work elucidated the effects of growth conditions and substrate pattern geometry on the growth of large area Si microwire arrays grown with SiCl4. In addition, we also developed a process to grow p-type Si nanowire arrays using aluminum as the catalyst metal instead of gold. Finally, our work demonstrated the feasibility of growing vertical arrays of Si wires on non-crystalline glass substrates using polycrystalline Si template layers. The accomplishments demonstrated in this project will pave the way for future advances in radial junction wire array solar cells.« less

  2. Geological and geochemical aspects of uranium deposits. A selected, annotated bibliography. Vol. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, M.B.; Garland, P.A.

    1977-10-01

    This bibliography was compiled by selecting 580 references from the Bibliographic Information Data Base of the Department of Energy's (DOE) National Uranium Resource Evaluation (NURE) Program. This data base and five others have been created by the Ecological Sciences Information Center to provide technical computer-retrievable data on various aspects of the nation's uranium resources. All fields of uranium geology are within the defined scope of the project, as are aerial surveying procedures, uranium reserves and resources, and universally applied uranium research. References used by DOE-NURE contractors in completing their aerial reconnaissance survey reports have been included at the request ofmore » the Grand Junction Office, DOE. The following indexes are provided to aid the user in locating reference of interest: author, keyword, geographic location, quadrangle name, geoformational index, and taxonomic name.« less

  3. Josephson Circuits as Vector Quantum Spins

    NASA Astrophysics Data System (ADS)

    Samach, Gabriel; Kerman, Andrew J.

    While superconducting circuits based on Josephson junction technology can be engineered to represent spins in the quantum transverse-field Ising model, no circuit architecture to date has succeeded in emulating the vector quantum spin models of interest for next-generation quantum annealers and quantum simulators. Here, we present novel Josephson circuits which may provide these capabilities. We discuss our rigorous quantum-mechanical simulations of these circuits, as well as the larger architectures they may enable. This research was funded by the Office of the Director of National Intelligence (ODNI) and the Intelligence Advanced Research Projects Activity (IARPA) under Air Force Contract No. FA8721-05-C-0002. The views and conclusions contained herein are those of the authors and should not be interpreted as necessarily representing the official policies or endorsements, either expressed or implied, of ODNI, IARPA, or the US Government.

  4. Design, fabrication and characterization of a poly-silicon PN junction

    NASA Astrophysics Data System (ADS)

    Tower, Jason D.

    This thesis details the design, fabrication, and characterization of a PN junction formed from p-type mono-crystalline silicon and n-type poly-crystalline silicon. The primary product of this project was a library of standard operating procedures (SOPs) for the fabrication of such devices, laying the foundations for future work and the development of a class in fabrication processes. The fabricated PN junction was characterized; in particular its current-voltage relationship was measured and fit to models. This characterization was to determine whether or not the fabrication process could produce working PN junctions with acceptable operational parameters.

  5. Development and Implementation of a Segment/Junction Box Level Database for the ITS Fiber Optic Conduit Network

    DOT National Transportation Integrated Search

    2012-03-01

    This project initiated the development of a computerized database of ITS facilities, including conduits, junction : boxes, cameras, connections, etc. The current system consists of a database of conduit sections of various lengths. : Over the length ...

  6. The Characterization and Circumvention of Carbon Nanotube Junctions - The Route to Practical Carbon Conductors Through Extreme Frequency, Fields, and Light

    DTIC Science & Technology

    2015-05-22

    Conductors Through Extreme Frequency, Fields, and Light Krzysztof Koziol THE CHANCELLOR, MASTER AND SCHOLARS OF THE UNIVERISTY OF CAMBRIDGE...2011 to 31 August 2014 Air Force Research Laboratory Air Force Office of Scientific Research European Office of Aerospace Research and...Carbon Conductors Through Extreme Frequency, Fields, and Light Krzysztof Koziol THE CHANCELLOR, MASTER AND SCHOLARS OF THE UNIVERISTY OF CAMBRIDGE THE

  7. Diffused junction p(+)-n solar cells in bulk GaAs. II - Device characterization and modelling

    NASA Technical Reports Server (NTRS)

    Keeney, R.; Sundaram, L. M. G.; Rode, H.; Bhat, I.; Ghandhi, S. K.; Borrego, J. M.

    1984-01-01

    The photovoltaic characteristics of p(+)-n junction solar cells fabricated on bulk GaAs by an open tube diffusion technique are presented in detail. Quantum efficiency measurements were analyzed and compared to computer simulations of the cell structure in order to determine material parameters such as diffusion length, surface recombination velocity and junction depth. From the results obtained it is projected that proper optimization of the cell parameters can increase the efficiency of the cells to close to 20 percent.

  8. The state of research into children with cancer across Europe: new policies for a new decade

    PubMed Central

    Pritchard-Jones, K; Lewison, G; Camporesi, S; Vassal, G; Ladenstein, R; Benoit, Y; Predojevic, JS; Sterba, J; Stary, J; Eckschlager, T; Schroeder, H; Doz, F; Creutzig, U; Klingebiel, T; Kosmidis, HV; Garami, M; Pieters, R; O’Meara, A; Dini, G; Riccardi, R; Rascon, J; Rageliene, L; Calvagna, V; Czauderna, P; Kowalczyk, JR; Gil-da-Costa, MJ; Norton, L; Pereira, F; Janic, D; Puskacova, J; Jazbec, J; Canete, A; Hjorth, L; Ljungman, G; Kutluk, T; Morland, B; Stevens, M; Walker, D; Sullivan, R

    2011-01-01

    Overcoming childhood cancers is critically dependent on the state of research. Understanding how, with whom and what the research community is doing with childhood cancers is essential for ensuring the evidence-based policies at national and European level to support children, their families and researchers. As part of the European Union funded EUROCANCERCOMS project to study and integrate cancer communications across Europe, we have carried out new research into the state of research in childhood cancers. We are very grateful for all the support we have received from colleagues in the European paediatric oncology community, and in particular from Edel Fitzgerald and Samira Essiaf from the SIOP Europe office. This report and the evidence-based policies that arise from it come at a important junction for Europe and its Member States. They provide a timely reminder that research into childhood cancers is critical and needs sustainable long-term support. PMID:22276053

  9. Demonstration of geophysical methods for burial ground geophysical characterization study at the DOE Savannah River site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hasbrouck, J.C.; MacLean, H.D.; Geotech, R.

    1996-11-01

    Rust Geotech, operating contractor at the U.S. Department of Energy Grand Junction Projects Office (DOE-GJPO), conducted a demonstration of the trench boundary and large-object location capabilities of five nonintrusive geophysical methods in the Low-Level Radioactive Waste Disposal Facility (LLRWDF) at the DOE Savannah River Site (SRS). The plan for Resource Conservation and Recovery Act (RCRA) closure of the SRS LLRWDF specifies inplace compaction of {open_quotes}B-25{close_quotes} metal boxes containing low-level radioactive wastes. The boxes are buried in Engineered Low-Level Trenches (ELLTs) at the facility. To properly guide and control the compaction operation, the coordinates of the trench boundaries must be determinedmore » to an accuracy within 5 feet and the outer edges of the metal boxes in the trenches must be determined to within 2 feet.« less

  10. MicroBooNE project team recognized by Department of Energy | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  11. 18 CFR 4.70 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT COSTS Application for License for Transmission Line Only § 4.70 Applicability. This subpart... licensed water power project to the point of junction with the distribution system or with the...

  12. 18 CFR 4.70 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT COSTS Application for License for Transmission Line Only § 4.70 Applicability. This subpart... licensed water power project to the point of junction with the distribution system or with the...

  13. 18 CFR 4.70 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT COSTS Application for License for Transmission Line Only § 4.70 Applicability. This subpart... licensed water power project to the point of junction with the distribution system or with the...

  14. 18 CFR 4.70 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROJECT COSTS Application for License for Transmission Line Only § 4.70 Applicability. This subpart... licensed water power project to the point of junction with the distribution system or with the...

  15. 18 CFR 4.70 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROJECT COSTS Application for License for Transmission Line Only § 4.70 Applicability. This subpart... licensed water power project to the point of junction with the distribution system or with the...

  16. 11. INTERIOR VIEW TO THE NORTHEAST OF ROOM 160, AN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. INTERIOR VIEW TO THE NORTHEAST OF ROOM 160, AN OFFICE BY THE MAIN ENTRANCE DOOR OF THE ADMINISTRATION AREA. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV

  17. Model Career Exploratory Program. Junction City Jr. High School. Final Report.

    ERIC Educational Resources Information Center

    Kennedy, Anthony

    The report describes a career education demonstration project conducted in Junction City, Oregon, a city of 2,535 people with a high concentration of low-income families. Major limitations encountered were resistance to change and lack of funds. Procedures included four inservice sessions for instructional and guidance staff and four visitations…

  18. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  19. A novel adhering junction in the apical ciliary apparatus of the rotifer Brachionus plicatilis (Rotifera, Monogononta).

    PubMed

    Dallai, R; Lupetti, P; Lane, N J

    1996-10-01

    Cultures of the rotifer Brachionus plicatilis were examined with regard to their interepithelial junctions after infiltration with the extracellular tracer lanthanum, freeze-fracturing or quick-freeze deep-etching. The lateral borders between ciliated cells have an unusual apical adhering junction. This apical part of their intercellular cleft looks desmosome-like, but it is characterized by unusual intramembranous E-face clusters of particles. Deep-etching reveals that these are packed together in short rows which lie parallel to one another in orderly arrays. The true membrane surface in these areas features filaments in the form of short ribbons; these are produced by projections, possibly part of the glycocalyx, emerging from the membranes, between which the electron-dense tracer lanthanum permeates. These projections appear to overlap with each other in the centre of the intercellular cleft; this would provide a particularly flexible adaptation to maintain cell-cell contact and coordination as a consequence. The filamentous ribbons may be held in position by the intramembranous particle arrays since both have a similar size and distribution. These contacts are quite different from desmosomes and appear to represent a distinct new category of adhesive cell-cell junction. Beneath these novel structures, conventional pleated septate junctions are found, exhibiting the undulating intercellular ribbons typical of this junctional type, as well as the usual parallel alignments of intramembranous rows of EF grooves and PF particles. Below these are found gap junctions as close-packed plaques of intramembranous particles on either the P-face or E-face. After freeze-fracturing, the complementary fracture face to the particles shows pits, usually on the P-face, arrayed with a very precise hexagonal pattern.

  20. 17. INTERIOR VIEW TO THE EAST OF ROOM 215, A ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. INTERIOR VIEW TO THE EAST OF ROOM 215, A SECOND FLOOR OFFICE ABOVE ROOM 137 IN THE COLD ASSEMBLY AREA. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV

  1. Oceanographic Telecommuting: Going to Sea Virtually

    NASA Astrophysics Data System (ADS)

    Smith, Deborah K.; Lemmond, Peter

    2005-09-01

    Oceanography in the 21st century is on the verge of changing the way it does business. Telecommuting from office to sea is about to make the same impact as telecommuting between home and the office did 20 years ago. A recent geophysical survey highlighted the role that telecommuting will soon play in ocean research. In June 2005, R/V Knorr was in the middle of the Atlantic Ocean conducting a geophysical survey of a region centered at 13°N along the Mid-Atlantic Ridge in the general area of the diffuse triple junction between the North America (NA),Africa (AF), and South America (SA) plates. This region is particularly notable because of a unique zone of seismicity that occurs ~70 km west of the ridge axis between 14°20'N and 12°50'N.The survey conducted on this cruise (KN182-3) was a first step toward understanding how slow spreading lithosphere is deforming in the NA-SA-AF triple junction region.

  2. Geological and geochemical aspects of uranium deposits. A selected, annotated bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garland, P.A.; Thomas, J.M.; Brock, M.L.

    1980-06-01

    A bibliography of 479 references encompassing the fields of uranium and thorium geochemistry and mineralogy, geology of uranium deposits, uranium mining, and uranium exploration techniques has been compiled by the Ecological Sciences Information Center of Oak Ridge National Laboratory. The bibliography was produced for the National Uranium Resource Evaluation Program, which is funded by the Grand Junction Office of the Department of Energy. The references contained in the bibliography have been divided into the following eight subject categories: (1) geology of deposits, (2) geochemistry, (3) genesis O deposits, (4) exploration, (5) mineralogy, (6) uranium industry, (7) reserves and resources, andmore » (8) geology of potential uranium-bearing areas. All categories specifically refer to uranium and thorium; the last category contains basic geologic information concerning areas which the Grand Junction Office feels are particularly favorable for uranium deposition. The references are indexed by author, geographic location, quadrangle name, geoformational feature, taxonomic name, and keyword.« less

  3. Symmetry breaking in SNS junctions: edge transport and field asymmetries

    NASA Astrophysics Data System (ADS)

    Suominen, Henri; Nichele, Fabrizio; Kjaergaard, Morten; Rasmussen, Asbjorn; Danon, Jeroen; Flensberg, Karsten; Levitov, Leonid; Shabani, Javad; Palmstrom, Chris; Marcus, Charles

    We study magnetic diffraction patterns in a tunable superconductor-semiconductor-superconductor junction. By utilizing epitaxial growth of aluminum on InAs/InGaAs we obtain transparent junctions which display a conventional Fraunhofer pattern of the critical current as a function of applied perpendicular magnetic field, B⊥. By studying the angular dependence of the critical current with applied magnetic fields in the plane of the junction we find a striking anisotropy. We attribute this effect to dephasing of Andreev states in the bulk of the junction, leading to SQUID like behavior when the magnetic field is applied parallel to current flow. Furthermore, in the presence of both in-plane and perpendicular fields, asymmetries in +/-B⊥ are observed. We suggest possible origins and discuss the role of spin-orbit and Zeeman physics together with a background disorder potential breaking spatial symmetries of the junction. Research supported by Microsoft Project Q, the Danish National Research Foundation and the NSF through the National Nanotechnology Infrastructure Network.

  4. 50 CFR 36.39 - Public use.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., and Swanson Lakes are only open for sport ice fishing. Andy Simons Unit Emerald Lake Green Lake Harvey..., waysides, buildings or the Sterling Highway from the east refuge boundary to the east junction of the... buildings, piers, docks, weirs, refuge offices, visitor centers, and public access and parking sites. Maps...

  5. 76 FR 63919 - Whitestone Power and Communications; Notice of Technical Teleconference To Discuss Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ...). d. Name of Project: Microturbine Hydrokinetic River-In-Stream Energy Conversion Power Project (also.... Selvaggio, Whitestone Power and Communications, P.O. Box 1630, Delta Junction, Alaska 99737; (907) 895- 4938...: The proposed Microturbine Hydrokinetic River-In-Stream Energy Conversion Power Project would consist...

  6. 77 FR 27757 - Whitestone Power and Communications; Notice of Application Accepted for Filing, Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Communications. e. Name of Project: Whitestone Poncelet River-In-Stream-Energy- Conversion Project (also known as the Microturbine Hydrokinetic River- In-Stream-Energy-Conversion Project) f. Location: The proposed.... Selvaggio, Whitestone Power and Communications, P.O. Box 1630, Delta Junction, Alaska 99737; phone: (907...

  7. 48 CFR 315.305 - Proposal evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... such cases, the Contracting Officer shall request the Project Officer's assistance in analyzing the.... (7) Other direct costs not specified above. (ii) The Project Officer shall provide written comments... Project Officer's comments for negotiations or to support award without discussions. The Contracting...

  8. 48 CFR 315.305 - Proposal evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... such cases, the Contracting Officer shall request the Project Officer's assistance in analyzing the.... (7) Other direct costs not specified above. (ii) The Project Officer shall provide written comments... Project Officer's comments for negotiations or to support award without discussions. The Contracting...

  9. 48 CFR 315.305 - Proposal evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... such cases, the Contracting Officer shall request the Project Officer's assistance in analyzing the.... (7) Other direct costs not specified above. (ii) The Project Officer shall provide written comments... Project Officer's comments for negotiations or to support award without discussions. The Contracting...

  10. Innovation in health service management: Adoption of project management offices to support major health care transformation.

    PubMed

    Lavoie-Tremblay, Mélanie; Aubry, Monique; Cyr, Guylaine; Richer, Marie-Claire; Fortin-Verreault, Jean-François; Fortin, Claude; Marchionni, Caroline

    2017-11-01

    To explore the characteristics that influence project management offices acceptance and adoption in healthcare sector. The creation of project management offices has been suggested as a promising avenue to promote successful organisational change and facilitate evidence-based practice. However, little is known about the characteristics that promote their initial adoption and acceptance in health care sector. This knowledge is important in the context where many organisations are considering implementing project management offices with nurse managers as leaders. A descriptive multiple case study design was used. The unit of analysis was the project management offices. The study was conducted in three university-affiliated teaching hospitals in 2013-14 (Canada). Individual interviews (n = 34) were conducted with senior managers. Results reveal that project management offices dedicated to project and change management constitute an innovation and an added value that addresses tangible needs in the field. Project management offices are an innovation highly compatible with health care managers and their approach has parallels to the process of clinical problem solving and reasoning well-known to adopters. This knowledge is important in a context where many nurses hold various roles in project management offices, such as Director, project manager, clinical expert and knowledge broker. © 2017 John Wiley & Sons Ltd.

  11. Batavia Boy Scouts | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  12. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  13. FIFRA Project Officers Manual

    EPA Pesticide Factsheets

    The FIFRA Project Officers Manual provides guidance to new as well as experienced project officers in the management of grants and cooperative agreements under the Federal Insecticide, Fungicide and Rodenticide Act.

  14. Buy or sell used musical instruments | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  15. David Toback re-elected CDF co-spokesperson | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  16. Alaska Department of Natural Resources

    Science.gov Websites

    Department of Natural Resources logo Department of Natural Resources Office of Project Management & Restoration Coastal Impact Assistance Program Natural Resources / Office of Project Management & ; Permitting Welcome to the Office of Project Management & Permitting Large Project Coordination The

  17. DNR Recorder's Office

    Science.gov Websites

    • Bettles • Bettles Field (Evansville) • Biedermans Camp • Big Delta • Big Horn • Big Lake • Birch • College • Crooked Creek • Dahten • Dall • Dalton • Delta Junction • Demarcation Pt • Diamond Â

  18. 76 FR 54753 - Whitestone Power and Communications; Notice of Intent To File License Application, Filing of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... of Project: Microturbine Hydrokinetic River-In-Stream Energy Conversion Power Project (also known as... Contact: Steven M. Selvaggio, Whitestone Power and Communications, P.O. Box 1630, Delta Junction, Alaska... Hydrokinetic River-In-Stream Energy Conversion Power Project) and number (P-13305-002), and bear the heading...

  19. Ground Test Investigation on a Thermal Protection System Junction

    NASA Astrophysics Data System (ADS)

    Panerai, F.; Thoemel, J.; Chazot, O.

    2009-01-01

    During the atmospheric reentry of a spacecraft, the dissociated flow around its Thermal Protection System (TPS) could travel from a low cat- alytic to a high catalytic surface. In this situation a peak of heat flux is experienced at the junction between the two materials. A safe vehicle design cannot preclude investigations on such a phenomenon, since the consequent heating could be harmful for the integrity of TPS. The present work finds its framework on the EXPERT (Eu- ropean eXPErimental Re-entry Testbed) project. The EXPERT vehicle TPS is composed of a C/SiC nose and a PM1000 skirt, so that a catalytic transition occurs in correspondence of their junction. Experiments on wall catalysis phenomena over Thermal Protection Materials (TPM) are performed in this project, using the von Karman Institute (VKI) induction-coupled plasma generator (Plasmatron), under operating conditions representative for real flight situation. In- frared thermography and pyrometry temperature measurements are performed in order to experimentally prove and quantify the transition.

  20. 18 CFR 376.204 - Delegation of Commission authority during emergency conditions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the Office of Energy Projects; (v) Director of the Office of Electric Reliability; (vi) Director of... Energy Projects, in order of seniority; (x) Deputy Directors, Office of Electric Reliability, in order of... Energy Projects; Assistant Directors and Division heads, Office of Electric Reliability; Deputy Associate...

  1. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... directive whatever. (d) All technical directions must be issued in writing by the project officer or must be... advise the contractor in writing that, in the contracting officer's opinion, the technical direction is... subject to the technical direction of the NRC project officer. The term technical direction is defined to...

  2. From Nigel Lockyer: Five things you should know | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  3. Transport properties of two-dimensional metal-phthalocyanine junctions: An ab initio study

    NASA Astrophysics Data System (ADS)

    Liu, Shuang-Long; Wang, Yun-Peng; Li, Xiang-Guo; Cheng, Hai-Ping

    We study two dimensional (2D) electronic/spintronic junctions made of metal-organic frameworks via first-principles simulation. The system consists of two Mn-phthalocyanine leads and a Ni-phthalocyanine center. A 2D Mn phthalocyanine sheet is ferromagnetic half metal and a 2D Ni phthalocyanine sheet is nonmagnetic semiconductor. Our results show that this system has a large tunnel magnetic resistance. The transmission coefficient at Fermi energy decays exponentially with the length of the central region which is not surprising. However, the transmission of the junction can be tuned using gate voltage by up to two orders of magnitude. The origin of the change lies in the mode matching between the lead and the center electronic states. Moreover, the threshold gate voltage varies with the length of the center region which provides a way of engineering the transport properties. Finally, we combine non-equilibrium Green's function and Boltzmann transport equation to compute conductance of the junction. This work was supported by the US Department of Energy (DOE), Office of Basic Energy Sciences (BES), under Contract No. DE-FG02-02ER45995. Computations were done using the utilities of NERSC and University of Florida Research Computing.

  4. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  5. Evaporative oxidation treatability test report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    In 1992, Congress passed the Federal Facilities Compliance Act that requires the U.S. Department of Energy (DOE) to treat and dispose of its mixed waste in accordance with the Resource Conservation and Recovery Act (RCRA) land disposal restrictions (LDRs). In response to the need for mixed-waste treatment capacity where available off-site commercial treatment facilities do not exist or cannot be used, the DOE Albuquerque Operations Office (DOE-AL) organized a Treatment Selection Team to match mixed wastes with treatment options and develop a strategy for treatment of its mixed wastes. DOE-AL manages operations at nine sites with mixed-waste inventories. The Treatmentmore » Selection Team determined a need to develop mobile treatment capacity to treat wastes at the sites where the wastes are generated. Treatment processes used for mixed waste not only must address the hazardous component (i.e., meet LDRs) but also must contain the radioactive component in a form that allows final disposal while protecting workers, the public, and the environment. On the basis of recommendations of the Treatment Selection Team, DOE-AL assigned projects to the sites to bring mixed-waste treatment capacity on-line. The three technologies assigned to the DOE Grand Junction Projects Office (GJPO) are evaporative oxidation, thermal desorption, and treated wastewater evaporation. Rust Geotech, the DOE-GJPO prime contractor, was assigned to design and fabricate mobile treatment units (MTUs) for these three technologies and to deliver the MTUs to selected DOE-AL sites. To conduct treatability tests at the GJPO, Rust leased a pilot-scale evaporative oxidation unit from the Clemson Technical Center (CTC), Anderson, South Carolina. The purpose of this report is to document the findings and results of tests performed using this equipment.« less

  6. Quasibound states in short SNS junctions with point defects

    NASA Astrophysics Data System (ADS)

    Bespalov, A. A.

    2018-04-01

    Using the Green functions technique, we study the subgap spectrum of short three-dimensional superconductor-normal metal-superconductor junctions containing one or two point impurities in the normal layer. We find that a single nonmagnetic or magnetic defect induces two quasibound Shiba-like states. If the defect is located close to the junction edge, the energies of these states oscillate as functions of the distance between the impurity and the edge. In the case of two nonmagnetic impurities, there are generally four quasibound states (two per spin projection). Their energies oscillate as functions of the distance between the impurities, and reach their asymptotic values when this distance becomes much larger than the Fermi wavelength. The contributions of the impurities to the Josephson current, local density of states, and to the normal-state conductance of the junction are analyzed.

  7. 20. DETAIL OF OFFICE FURNITURE IN NORTHEAST CORNER OF SECRETARIES' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. DETAIL OF OFFICE FURNITURE IN NORTHEAST CORNER OF SECRETARIES' OFFICE ALONG NORTH SIDE OF FIRST FLOOR. VIEW TO NORTHEAST. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  8. 78 FR 16792 - Designation of Areas for Air Quality Planning Purposes; State of California; Imperial Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ... (see, e.g., the PM 10 area designations in 40 CFR 81.305 for Coso Junction planning area, Owens Valley..., this action: Is not ``significant regulatory actions'' subject to review by the Office of Management..., 1999); Is not economically significant regulatory actions based on health or safety risks subject to...

  9. Smart Gun Technology project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiss, D.R.

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness inmore » models of a smart firearm.« less

  10. MYONEURAL JUNCTIONS OF TWO ULTRASTRUCTURALLY DISTINCT TYPES IN EARTHWORM BODY WALL MUSCLE

    PubMed Central

    Rosenbluth, Jack

    1972-01-01

    The longitudinal muscle of the earthworm body wall is innervated by nerve bundles containing axons of two types which form two corresponding types of myoneural junction with the muscle fibers Type I junctions resemble cholinergic neuromuscular junctions of vertebrate skeletal muscle and are characterized by three features: (a) The nerve terminals contain large numbers of spherical, clear, ∼500 A vesicles plus a small number of larger dense-cored vesicles (b) The junctional gap is relatively wide (∼900 A), and it contains a basement membrane-like material, (c) The postjunctional membrane, although not folded, displays prominent specializations on both its external and internal surfaces The cytoplasmic surface is covered by a dense matrix ∼200 A thick which appears to be the site of insertion of fine obliquely oriented cytoplasmic filaments The external surface exhibits rows of projections ∼200 A long whose bases consist of hexagonally arrayed granules seated in the outer dense layer of the plasma membrane The concentration of these hexagonally disposed elements corresponds to the estimated concentration of both receptor sites and acetylcholinesterase sites at cholinergic junctions elsewhere. Type II junctions resemble the adrenergic junctions in vertebrate smooth muscle and exhibit the following structural characteristics: (a) The nerve fibers contain predominantly dense-cored vesicles ∼1000 A in diameter (b) The junctional gap is relatively narrow (∼150 A) and contains no basement membrane-like material, (c) Postjunctional membrane specialization is minimal. It is proposed that the structural differences between the two types of myoneural junction reflect differences in the respective transmitters and corresponding differences in the mechanisms of transmitter action and/or inactivation. PMID:5044759

  11. Josephson current signatures of the Majorana flat bands on the surface of time-reversal-invariant Weyl and Dirac semimetals

    NASA Astrophysics Data System (ADS)

    Chen, Anffany; Pikulin, Dmitry I.; Franz, Marcel

    A linear Josephson junction mediated by the surface states of a time-reversal-invariant Weyl or Dirac semimetal localizes Majorana flat bands protected by the time-reversal symmetry. We show that as a result, the Josephson current exhibits a discontinuous jump at π phase difference which can serve as an experimental signature of the Majorana bands. The magnitude of the jump scales proportionally to the junction length and the momentum space distance between the Weyl nodes projected onto the junction. It also exhibits a characteristic dependence on the junction orientation. We demonstrate that the jump is robust against the effects of non-zero temperature and weak non-magnetic disorder. This work was supported by NSERC and CIfAR. In addition A.C. acknowledges support by the 2016 Boulder Summer School for Condensed Matter and Materials Physics through NSF Grant DMR-13001648.

  12. Proliferative defects and formation of a double cortex in mice lacking Mltt4 and Cdh2 in the dorsal telencephalon.

    PubMed

    Gil-Sanz, Cristina; Landeira, Bruna; Ramos, Cynthia; Costa, Marcos R; Müller, Ulrich

    2014-08-06

    Radial glial cells (RGCs) in the ventricular neuroepithelium of the dorsal telencephalon are the progenitor cells for neocortical projection neurons and astrocytes. Here we show that the adherens junction proteins afadin and CDH2 are critical for the control of cell proliferation in the dorsal telencephalon and for the formation of its normal laminar structure. Inactivation of afadin or CDH2 in the dorsal telencephalon leads to a phenotype resembling subcortical band heterotopia, also known as "double cortex," a brain malformation in which heterotopic gray matter is interposed between zones of white matter. Adherens junctions between RGCs are disrupted in the mutants, progenitor cells are widely dispersed throughout the developing neocortex, and their proliferation is dramatically increased. Major subtypes of neocortical projection neurons are generated, but their integration into cell layers is disrupted. Our findings suggest that defects in adherens junctions components in mice massively affects progenitor cell proliferation and leads to a double cortex-like phenotype. Copyright © 2014 the authors 0270-6474/14/3410475-13$15.00/0.

  13. A differential spectral responsivity measurement system constructed for determining of the spectral responsivity of a single- and triple-junction photovoltaic cells

    NASA Astrophysics Data System (ADS)

    Sametoglu, Ferhat; Celikel, Oguz; Witt, Florian

    2017-10-01

    A differential spectral responsivity (DSR) measurement system has been designed and constructed at National Metrology Institute of Turkey (TUBITAK UME) to determine the spectral responsivity (SR) of a single- or a multi-junction photovoltaic device (solar cell). The DSR setup contains a broad band light bias source composed of a constructed Solar Simulator based on a 1000 W Xe-arc lamp owning a AM-1.5 filter and 250 W quartz-tungsten-halogen lamp, a designed and constructed LED-based Bias Light Sources, a DC voltage bias circuit, and a probe beam optical power tracking and correction circuit controlled with an ADuC847 microcontroller card together with an embedded C based software, designed and constructed in TUBITAK UME under this project. By using the constructed DSR measurement system, the SR calibration of solar cells, the monolitic triple-junction solar cell GaInP/GaInAs/Ge and its corresponding component cells have been performed within the EURAMET Joint Research Project SolCell.

  14. Analysis and evalaution in the production process and equipment area of the low-cost solar array project. [including modifying gaseous diffusion and using ion implantation

    NASA Technical Reports Server (NTRS)

    Goldman, H.; Wolf, M.

    1979-01-01

    The manufacturing methods for photovoltaic solar energy utilization are assessed. Economic and technical data on the current front junction formation processes of gaseous diffusion and ion implantation are presented. Future proposals, including modifying gaseous diffusion and using ion implantation, to decrease the cost of junction formation are studied. Technology developments in current processes and an economic evaluation of the processes are included.

  15. Mixing at double-Tee junctions with unequal pipe sizes in ...

    EPA Pesticide Factsheets

    Pipe flow mixing with various solute concentrations and flow rates at pipe junctions is investigated. The degree of mixing affects the spread of contaminants in a water distribution system. Many studies have been conducted on the mixing at the cross junctions. Yet a few have focused on double-Tee junctions of unequal pipe sizes. To investigate the solute mixing at double-Tee junctions with unequal pipe sizes, a series of experiments were conducted in a turbulent regime (Re=12500–50000) with different Reynolds number ratios and connecting pipe lengths. It is shown that dimensionless outlet concentrations depended on mixing mechanism at the impinging interface of junctions. Junction with a larger pipe size ratio is associated with more complete mixing. The inlet Reynolds number ratio affects mixing more strongly than the outlet Reynolds number ratio. Furthermore, the dimensionless connecting pipe length in a double-Tee played an important and complicated role in the flow mixing. Based on these results, two-dimensional isopleth maps were developed for the calculation of normalized north outlet concentration. This journal article is to communicate the research results on pipe juncture mixing, a widespread and important phenomena in distribution system water quality analysis. The research outcome improves EPANET modeling capability for safe water supplies. In addition, the research is one of the outputs from the EPA-MOST bilateral cooperative research Project #1

  16. 78 FR 55225 - Determination of Attainment for the Chico Nonattainment Area for the 2006 Fine Particle Standard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...); and 75 FR 27944 (May 19, 2010) (Coso Junction, California area). Thus EPA has established that, under... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not... based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997); Is not a...

  17. Confinement in Melts of Chains with Junction Points, but No Ends

    NASA Astrophysics Data System (ADS)

    Foster, Mark; He, Qiming; Zhou, Yang; Zhang, Fan; Huang, Chongwen; Narayanan, Suresh

    Measurements of surface fluctuations of 4-arm star and ''8-shaped'' analogs of the same polystyrene (PS) chain show that elimination of chain ends is much more important in dictating the fragility in a thin film than is the introduction of a branch point in the molecule. Both the viscosities derived from surface fluctuations and rheological measurements for the 8-shaped PS manifest a lower value than the 4-arm star PS analog, with the discrepancy increasing as the temperature approaches the glass transition temperature, Tg , bulk. Comparison among different chain topologies shows the effect of the number of chain ends and junction point on the viscosity. The viscosity behavior of the 8-shaped PS is quite different from that of the star analog, but similar to that of the simple cycle analog. The fragility of the 8-shaped molecule in the thin film is reduced relative to that in the bulk, manifesting a nanoconfinement effect. This research used resources of the Advanced Photon Source, a U.S. Department of Energy (DOE) Office of Science User Facility operated for the DOE Office of Science by Argonne National Laboratory under Contract No. DE-AC02-06CH11357.

  18. 77 FR 5023 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... proposed information collection project: ``Medical Office Survey on Patient Safety Culture Comparative... . SUPPLEMENTARY INFORMATION: Proposed Project Medical Office Survey on Patient Safety Culture Comparative Database... AHRQ Medical Office Survey on Patient Safety Culture (Medical Office SOPS) Comparative Database. The...

  19. 18 CFR 16.8 - Consultation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ....6 of this chapter. (4) The Director of the Office of Energy Projects will, upon request, provide a... otherwise extended by the Director of Office of Energy Projects pursuant to paragraph (b)(6) of this section... Office of Energy Projects (Director) for resolution. (ii) The entity referring the dispute must serve a...

  20. 18 CFR 16.8 - Consultation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ....6 of this chapter. (4) The Director of the Office of Energy Projects will, upon request, provide a... otherwise extended by the Director of Office of Energy Projects pursuant to paragraph (b)(6) of this section... Office of Energy Projects (Director) for resolution. (ii) The entity referring the dispute must serve a...

  1. 18 CFR 16.8 - Consultation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ....6 of this chapter. (4) The Director of the Office of Energy Projects will, upon request, provide a... otherwise extended by the Director of Office of Energy Projects pursuant to paragraph (b)(6) of this section... Office of Energy Projects (Director) for resolution. (ii) The entity referring the dispute must serve a...

  2. Technical Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project

    DTIC Science & Technology

    2005-09-30

    Technical Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project William R. Metzger Marine...Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT

  3. OPERATION DOMINIC. FISH BOWL SERIES. Project Officer’s Report. Project 8A.3. Close-In Thermal and X-Ray Vulnerability Measurements--Shots Blue Gill and King Fish

    DTIC Science & Technology

    1985-09-01

    QDC hLt umi ^ POR.2037 (WT-2037)(EX) VOLUME 1 EXTRACTED VERSION OPERATION DOMINIC, FISH BOWL SERIES Project Officer’s Report—Project 8A.3...Close-In Thermal and X-ray Vulnerability Measurements—Shots Blue Gill and King Fish F. D. Adams, Project Officer Flight Dynamics Laboratory Wright...version of POR-2037 (WT-2037), Volume 1, OPERATION DOMINIC; Fish Bowl Series, Project 8A. 3. Approved for public release; distribution is unlimited

  4. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  5. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  6. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  7. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  8. Space Solar Cell Research and Development Projects at Emcore Photovoltaics

    NASA Technical Reports Server (NTRS)

    Sharps, Paul; Aiken,Dan; Stan, Mark; Cornfeld, Art; Newman, Fred; Endicter, Scott; Girard, Gerald; Doman, John; Turner, Michele; Sandoval, Annette; hide

    2007-01-01

    The GaInP2/InGaAs/Ge triple junction device lattice matched to germanium has achieved the highest power conversion efficiency and the most commercial success for space applications [1]. What are the practical performance limits of this technology? In this paper we will describe what we consider to be the practical performance limits of the lattice matched GaInP2/InGaAs/Ge triple junction cell. In addition, we discuss the options for next generation space cell performance.

  9. Role of interface layers on Tunneling Magnetoresistance

    NASA Astrophysics Data System (ADS)

    Yang, See-Hun; Samant, Mahesh; Parkin, Stuart S. P.

    2002-03-01

    Thin non-magnetic metallic layers inserted at the interface between tunneling barriers and the ferromagnetic electrodes in magnetic tunnel junctions quenches the magnetoresistance (TMR) exhibited by some structures[1]. Studies have been carried out on exchange biased magnetic tunnel junction structures in which one of the ferromagnetic electrodes is pinned by coupling to IrMn or PtMn antiferromagnetic layers. For metallic aluminum interface layers thicknesses of just a few angstrom completely suppress the TMR although this characteristic thickness depends on the roughness of the tunneling barrier. A variety of structures will be discussed in which a number of interface layers have been introduced. In particular results for insertion of Cu, Ru and Cr layers on either side of the tunnel barrier will be presented. A number of techniques including XANES, XMCD and high resolution cross-section transmission electron microscopy have been used to study the structure and morphology of the interface layers and to correlate the structure of these layers with the magneto-transport properties of the tunneling junctions. [1] S.S.P. Parkin, US patent 5,764,567 issued by the United States Patent and Trademark Office, June 9, 1998.

  10. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  11. Short-time dynamics of molecular junctions after projective measurement

    NASA Astrophysics Data System (ADS)

    Tang, Gaomin; Xing, Yanxia; Wang, Jian

    2017-08-01

    In this work, we study the short-time dynamics of a molecular junction described by Anderson-Holstein model using full-counting statistics after projective measurement. The coupling between the central quantum dot (QD) and two leads was turned on at remote past and the system is evolved to steady state at time t =0 , when we perform the projective measurement in one of the lead. Generating function for the charge transfer is expressed as a Fredholm determinant in terms of Keldysh nonequilibrium Green's function in the time domain. It is found that the current is not constant at short times indicating that the measurement does perturb the system. We numerically compare the current behaviors after the projective measurement with those in the transient regime where the subsystems are connected at t =0 . The universal scaling for high-order cumulants is observed for the case with zero QD occupation due to the unidirectional transport at short times. The influences of electron-phonon interaction on short-time dynamics of electric current, shot noise, and differential conductance are analyzed.

  12. Low-energy BF2, BCl2, and BBr2 implants for ultrashallow P+-N junctions

    NASA Astrophysics Data System (ADS)

    Nandan, S. R.; Agarwal, Vikas; Banerjee, Sanjay K.

    1997-08-01

    We have examined low energy BCl2 and BBr2 implants as a means of fabricating ultra-shallow P+-N junctions. Five keV and 9 keV BCl2 implants and 18 keV BBr2 implants have been compared to 5 keV BF2 implants to study the benefits of using these species. BCl2 and BBr2, being heavier species, have a lower projected range and produce more damage. The greater damage restricts channeling, resulting in shallower as-implanted profiles. The increased damage amorphizes the substrate at low implant doses which results in reduced transient enhanced diffusion (TED) during the post-implant anneal. Post-anneal SIMS profiles indicate a junction depth reduction of over 10 nm (at 5 X 1017 cm-3 background doping) for 5 keV BCl2 implants as compared to 5 keV BF2 implants. Annealed junctions as shallow as 10 nm have been obtained from the 18 keV BBr2 implants. The increased damage degrades the electrical properties of these junctions by enhancing the leakage current densities. BCl2 implanted junctions have leakage current densities of approximately 1 (mu) A/cm2 as compared to 10 nA/cm2 for the BF2 implants. BBr2 implants have a lower leakage density of approximately 50 nA/cm2. Low energy BBr2 implants offer an exciting alternative for fabricating low leakage, ultra-shallow P+-N junctions.

  13. Finite element simulations of electrostatic dopant potentials in thin semiconductor specimens for electron holography.

    PubMed

    Somodi, P K; Twitchett-Harrison, A C; Midgley, P A; Kardynał, B E; Barnes, C H W; Dunin-Borkowski, R E

    2013-11-01

    Two-dimensional finite element simulations of electrostatic dopant potentials in parallel-sided semiconductor specimens that contain p-n junctions are used to assess the effect of the electrical state of the surface of a thin specimen on projected potentials measured using off-axis electron holography in the transmission electron microscope. For a specimen that is constrained to have an equipotential surface, the simulations show that the step in the projected potential across a p-n junction is always lower than would be predicted from the properties of the bulk device, but is relatively insensitive to the value of the surface state energy, especially for thicker specimens and higher dopant concentrations. The depletion width measured from the projected potential, however, has a complicated dependence on specimen thickness. The results of the simulations are of broader interest for understanding the influence of surfaces and interfaces on electrostatic potentials in nanoscale semiconductor devices. © 2013 Elsevier B.V. All rights reserved.

  14. Technical Support for Contaminated Sites

    EPA Science Inventory

    In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled...

  15. Flight Projects Office Information Systems Testbed (FIST)

    NASA Technical Reports Server (NTRS)

    Liggett, Patricia

    1991-01-01

    Viewgraphs on the Flight Projects Office Information Systems Testbed (FIST) are presented. The goal is to perform technology evaluation and prototyping of information systems to support SFOC and JPL flight projects in order to reduce risk in the development of operational data systems for such projects.

  16. 75 FR 71726 - Central Utah Project Completion Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... DEPARTMENT OF THE INTERIOR Central Utah Project Completion Act AGENCY: Department of the Interior..., Orem, Utah 84058-7303. Department of the Interior, Central Utah Project Completion Act Office, 302 East....cupcao.gov . FOR FURTHER INFORMATION: Contact Mr. Lee Baxter, Central Utah Project Completion Act Office...

  17. Estimates of the Officer Force Structure Required to Man the Projected Naval Combatant Forces of the 1980s and 1990s.

    DTIC Science & Technology

    1980-10-01

    Element, 64709N Prototype Manpower/Personnel Systems (U), Project Z1302-PN Officer Career Models (U), funded by the Office of the Deputy Assistant... Models for Navy Officer Billets portion of the proposed NPS research effort to develop an integrated officer system planning model ; the purpose of this...attempting to model the Naval officer force structure as a system. This study considers the primary first order factors which drive the requirements

  18. Transition from slab to slabless: Results from the 1993 Mendocino triple junction seismic experiment

    USGS Publications Warehouse

    Beaudoin, B.C.; Godfrey, N.J.; Klemperer, S.L.; Lendl, C.; Trehu, A.M.; Henstock, T.J.; Levander, A.; Holl, J.E.; Meltzer, A.S.; Luetgert, J.H.; Mooney, W.D.

    1996-01-01

    Three seismic refraction-reflection profiles, part of the Mendocino triple junction seismic experiment, allow us to compare and contrast crust and upper mantle of the North American margin before and after it is modified by passage of the Mendocino triple junction. Upper crustal velocity models reveal an asymmetric Great Valley basin overlying Sierran or ophiolitic rocks at the latitude of Fort Bragg, California, and overlying Sierran or Klamath rocks near Redding, California. In addition, the upper crustal velocity structure indicates that Franciscan rocks underlie the Klamath terrane east of Eureka, California. The Franciscan complex is, on average, laterally homogeneous and is thickest in the triple junction region. North of the triple junction, the Gorda slab can be traced 150 km inboard from the Cascadia subduction zone. South of the triple junction, strong precritical reflections indicate partial melt and/or metamorphic fluids at the base of the crust or in the upper mantle. Breaks in these reflections are correlated with the Maacama and Bartlett Springs faults, suggesting that these faults extend at least to the mantle. We interpret our data to indicate tectonic thickening of the Franciscan complex in response to passage of the Mendocino triple junction and an associated thinning of these rocks south of the triple junction due to assimilation into melt triggered by upwelling asthenosphere. The region of thickened Franciscan complex overlies a zone of increased scattering, intrinsic attenuation, or both, resulting from mechanical mixing of lithologies and/or partial melt beneath the onshore projection of the Mendocino fracture zone. Our data reveal that we have crossed the southern edge of the Gorda slab and that this edge and/or the overlying North American crust may have fragmented because of the change in stress presented by the edge.

  19. Progress toward a 30 percent-efficient, monolithic, three-junction, two-terminal concentrator solar cell for space applications

    NASA Technical Reports Server (NTRS)

    Partain, L. D.; Chung, B.-C.; Virshup, G. F.; Schultz, J. C.; Macmillan, H. F.; Ristow, M. Ladle; Kuryla, M. S.; Bertness, K. A.

    1991-01-01

    Component efficiencies of 0.2/sq cm cells at approximately 100x AMO light concentration and 80 C temperatures are not at 15.3 percent for a 1.9 eV AlGaAs top cell, 9.9 percent for a 1.4 eV GaAs middle cell under a 1.9 eV AlGaAs filter, and 2.4 percent for a bottom 1.0 eV InGaAs cell under a GaAs substrate. The goal is to continue improvement in these performance levels and to sequentially grow these devices on a single substrate to give 30 percent efficient, monolithic, two-terminal, three-junction space concentrator cells. The broad objective is a 30 percent efficient monolithic two-terminal cell that can operate under 25 to 100x AMO light concentrations and at 75 to 100 C cell temperatures. Detailed modeling predicts that this requires three junctions. Two options are being pursued, and both use a 1.9 eV AlGaAs top junction and a 1.4 eV GaAs middle junction grown by a 1 atm OMVPE on a lattice matched substrate. Option 1 uses a low-doped GaAs substrate with a lattice mismatched 1.0 eV InGaAs cell formed on the back of the substrate. Option 2 uses a Ge substrate to which the AlGaAs and GaAs top junctions are lattice matched, with a bottom 0.7 eV Ge junction formed near the substrate interface with the GaAs growth. The projected efficiency contributions are near 16, 11, and 3 percent, respectively, from the top, middle, and bottom junctions.

  20. 48 CFR 836.602-2 - Evaluation boards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...

  1. 5 CFR 470.301 - Program expectations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....301 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.301 Program expectations. (a) Demonstration projects permit the Office of Personnel...

  2. 78 FR 53477 - Notice of Relocation of the Bureau of Land Management's San Pedro Project Office in Sierra Vista, AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAZG02000.L143000000.EQ0000.TAS:14X1109.241A] Notice of Relocation of the Bureau of Land Management's San Pedro Project Office in Sierra Vista... relocation of the Bureau of Land Management's (BLM) San Pedro Project Office (SPPO), temporary closure of the...

  3. Smart gun technology requirements preliminary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiss, D.R.; Brandt, D.J.; Tweet, K.D.

    Goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing user-recognizing-and-authorizing surety technologies. This project is funded by the National Institute of Justice. This document reports the projects first objective: to find and document the requirements for a user-recognizing-and-authorizing firearm technology that law enforcement officers will value. This report details the problem of firearm takeaways in law enforcement, the methodology used to develop the law enforcement officers` requirements, and the requirements themselves.

  4. 18 CFR 376.204 - Delegation of Commission's authority during emergency conditions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...; (viii) Deputy Directors, Office of Energy Projects, in order of seniority; (ix) Deputy Directors, Office... Energy Projects; Assistant Directors and Division heads, Office of Electric Reliability; Deputy Associate... Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES ORGANIZATION...

  5. 18 CFR 376.204 - Delegation of Commission's authority during emergency conditions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...; (viii) Deputy Directors, Office of Energy Projects, in order of seniority; (ix) Deputy Directors, Office... Energy Projects; Assistant Directors and Division heads, Office of Electric Reliability; Deputy Associate... Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES ORGANIZATION...

  6. 18 CFR 376.204 - Delegation of Commission's authority during emergency conditions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; (viii) Deputy Directors, Office of Energy Projects, in order of seniority; (ix) Deputy Directors, Office... Energy Projects; Assistant Directors and Division heads, Office of Electric Reliability; Deputy Associate... Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES ORGANIZATION...

  7. 1. Photographic copy of photograph, in possession of SCIP Office, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photographic copy of photograph, in possession of SCIP Office, Coolidge, AZ. No date, circa 1940. Photographer unknown. HEADQUARTERS OFFICE, 205 W. ROOSEVELT, COOLIDGE, AZ. - San Carlos Irrigation Project, San Carlos Irrigation Project Headquarters, 205 West Roosevelt, Coolidge, Pinal County, AZ

  8. Carbon monoxide exposure among police officers working in a traffic dense region of Southern India.

    PubMed

    Nair, A J; Nandini, M; Adappa, S; Mahabala, C

    2017-01-01

    Currently, in India, air pollution is widespread in urban areas where vehicles are major contributors. The aim of this study was to investigate the level of exposure in traffic police officers exposed to vehicle exhaust for less than 8 h/day. The specific objective of the study was to determine the levels of carboxyhaemoglobin (COHb) in these officers. The effect of exposure for 8 h/day is known, but shorter durations of chronic exposure need to be investigated, and there is a need to explore the policy options in this exposed population. This cross-sectional study, included non-smoking traffic police officers between 30 and 50 years of age working for more than 2 years in busy traffic junctions. The cases were sex matched with controls of same age group, working in offices at a teaching hospital. Venous blood was collected at the end of 3 h of duty for estimation of COHb among both the groups. The COHb levels were expressed as percentage values. Differences between the COHb levels among the traffic police officers and office workers were analysed using the Mann-Whitney U test and considered significant at p < 0.05. Traffic police officers had significantly elevated COHb levels compared with the controls; 76.5% of traffic police officers had COHb >2.5% compared with no office workers at this level and 41.2% of the police officers had COHb levels >4%. Overall, 53.8% of officers with COHb >2.5% reported headaches compared with 15.8% of officers with COHb <2.5%.

  9. Straw man trade between multi-junction, gallium arsenide, and silicon solar cells

    NASA Technical Reports Server (NTRS)

    Gaddy, Edward M.

    1995-01-01

    Multi-junction (MJ), gallium arsenide (GaAs), and silicon (Si) solar cells have respective test efficiencies of approximately 24%, 18.5% and 14.8%. Multi-junction and gallium arsenide solar cells weigh more than silicon solar cells and cost approximately five times as much per unit power at the cell level. A straw man trade is performed for the TRMM spacecraft to determine which of these cell types would have offered an overall performance and price advantage to the spacecraft. A straw man trade is also performed for the multi-junction cells under the assumption that they will cost over ten times that of silicon cells at the cell level. The trade shows that the TRMM project, less the cost of the instrument, ground systems and mission operations, would spend approximately $552 thousand dollars per kilogram to launch and service science in the case of the spacecraft equipped with silicon solar cells. If these cells are changed out for gallium arsenide solar cells, an additional 31 kilograms of science can be launched and serviced at a price of approximately $90 thousand per kilogram. The weight reduction is shown to derive from the smaller area of the array and hence reductions in the weight of the array substrate and supporting structure. If the silicon solar cells are changed out for multi-junction solar cells, an additional 45 kilograms of science above the silicon base line can be launched and serviced at a price of approximately $58 thousand per kilogram. The trade shows that even if the multi-junction arrays are priced over ten times that of silicon cells, a price that is much higher than projected, that the additional 45 kilograms of science are launched and serviced at $182 thousand per kilogram. This is still much less than original $552 thousand per kilogram to launch and service the science. Data and qualitative factors are presented to show that these figures are subject to a great deal of uncertainty. Nonetheless, the benefit of the higher efficiency solar cells for TRMM is far greater than the uncertainties in the analysis.

  10. Cost Trade Between Multi-Junction, Gallium Arsenide, and Silicon Solar Cells

    NASA Technical Reports Server (NTRS)

    Gaddy, Edward M.

    1995-01-01

    Multi-junction (MJ), gallium arsenide (GaAs), and silicon (Si) solar cells have respective test efficiencies of approximately 24%, 18.5% and 14.8%. Multi-junction and gallium arsenide solar cells weigh more than silicon solar 2 cells and cost approximately five times as much per unit power at the cell level. A trade is performed for the TRMM spacecraft to determine which of these cell types would have offered an overall performance and price advantage to the spacecraft. A trade is also performed for the multi-junction cells under the assumption that they will cost over ten times that of silicon cells at the cell level. The trade shows that the TRMM project, less the cost of the instrument, ground systems and mission operations, would spend approximately $552,000 dollars per kilogram to launch and suppon3science in the case of the spacecraft equipped with silicon solar cells. If these cells are changed out for gallium arsenide solar cells, an additional 31 kilograms of science can be launched and serviced at a price of approximately $90 thousand per kilogram. The weight reduction is shown to derive from the smaller area of the array and hence reductions in the weight of the array substrate and supporting structure. ff the silicon solar cells are changed out for multi-junction solar cells, an additional 45 kilograms of science above the silicon base line can be launched and supported at a price of approximately $58,000 per kilogram. The trade shows that even if the multi-junction cells are priced over ten times that of silicon cells, a price that is much higher than projected, that the additional 45 kilograms of science are launched and serviced at $180,000 per kilogram. This is still much less than the original $552,000 per kilogram to launch and service the science. Data and qualitative factors are presented to show that these figures are subject to a great deal of uncertainty. Nonetheless, the benefit of the higher efficiency solar cells for TRMM is far greater than the uncertainties in the analysis.

  11. 18 CFR 12.2 - Rules of construction.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... relevant provision of this part, unless the Commission or the Director of the Office of Energy Projects..., health, or property. (b) A licensee may request from the Director of the Office of Energy Projects...

  12. 18 CFR 12.2 - Rules of construction.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... relevant provision of this part, unless the Commission or the Director of the Office of Energy Projects..., health, or property. (b) A licensee may request from the Director of the Office of Energy Projects...

  13. 18 CFR 12.2 - Rules of construction.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... relevant provision of this part, unless the Commission or the Director of the Office of Energy Projects..., health, or property. (b) A licensee may request from the Director of the Office of Energy Projects...

  14. 18 CFR 12.2 - Rules of construction.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... relevant provision of this part, unless the Commission or the Director of the Office of Energy Projects..., health, or property. (b) A licensee may request from the Director of the Office of Energy Projects...

  15. [Factors associated with investment in an office medicine project by general practice residents].

    PubMed

    Munck, Stéphane; Massin, Sophie; Hofliger, Philippe; Darmon, David

    2015-01-01

    To identify thefactors associated with investment in an office medicine project by French general practice (GP) residents. We conducted a national survey using a web-based self-administered questionnaire and analyzed the data collected by multiple logistic regressions. The dependent variable was "an office medicine project" The explanatory variables were both individual (socio-demographic and linked to training trajectories) and contextual (related to the available training programmes and the regional medical demography). The response rate was 48.5%. Out of the 1,695 residents of the study sample, 315 (18.6%) already had a project to setup an office practice during their third cycle ofmedical studies. The main factors associated with this project were (p < 0.05): to receive strong academic support, to live in a rural or semi-rural area, to work as a GP locum, to perform residency training in the same city as the medical training and to perform residency training in a region with a high percentage of GPs 55years and older. This study showed that a project to setup an office practice was influenced by both individual and contextualfactors. Special attention should be paid to the means and content of training to ensure better supportfor residents, which could make office general practice more attractive.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saleh, H; Ferjani, S; Masssey, V

    Purpose: Perform dosimetric comparison between planned and delivered dose in the junction area, measure daily dose variation in the arc junction area for pediatric patients treated for medulloblastoma using Craniospinal axis irradiation(CSI) Material and methods Dose comparison in the junction area, daily dose variation in the arc junction area for a Rando Phantom and 5 pediatric patients treated using CSI technique were analyzed. Plans were created using the Eclipse treatment planning system. Two arcs for cranium and 1 arc for spine region were used. Planar dose matrix was created by projecting phantom and patient plan into the ArcCheck phantom. EBT3more » film was placed in the middle of ArcCheck plug to measure dose distribution in the junction areaDuring patient treatment, strip of EBT3 film was placed daily at each junction area for verification. EBT3 films were scanned using a flatbed scanner, Epson Expression 10000 XL. Film QA pro software was used to analyze film. Scanning and analysis was performed according to vendor recommendations and AAPM TG-55 report. Films were scanned and analyzed daily after each treatment and at the end of treatment course. Planar dose distributions from films were compared with planar dose distribution from treatment planning system. Results: Comparison of planned vs. measured dose distributions for patients have passing rates of 90%–100% with 3% and 3 mm gamma analysis. In some of the treatment fractions, daily setup film showed variation in dose distribution in the junction area. Conclusion: It is critical to measure dose distribution in the arc junction area and use additional quality assurance measures to verify daily setup for CSI patient where one or more junctions are present. EBT3 film prove to be a good tool to achieve this task considering flexibility associated with the film such as symmetry, self-developing and ease of use.« less

  17. Electrical engineering research support for FDOT Traffic Statistics Office

    DOT National Transportation Integrated Search

    2010-03-01

    The aim of this project was to provide electrical engineering support for the telemetered traffic monitoring sites (TTMSs) operated by the Statistics Office of the Florida Department of Transportation. This project was a continuation of project BD-54...

  18. 78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery..., Office of Electricity Delivery and Energy Reliability (OE-20), U.S. Department of Energy, 1000...

  19. Discretionary Grants Administration Manual.

    ERIC Educational Resources Information Center

    Office of Human Development Services (DHHS), Washington, DC.

    This manual sets forth applicable administrative policies and procedures to recipients of discretionary project grants or cooperative agreements awarded by program offices in the Office of Human Development Services (HDS). It is intended to serve as a basic reference for project directors and business officers of recipient organizations who are…

  20. Using Project Management Systems at the Construction Field Office

    DTIC Science & Technology

    1989-03-01

    instrumentation 13550 transportation control instrumentation 13600 solor energy systems 13700 wind energy systems 13800 building automation systems ...Engineering Research Laboratory AD-A207 077 Using Project Management Systems at the Construction Field Office by E. William East Jeffrey G. Kirby Automated...automated systems available, engineers at the construction fieid office (or resident office) are faced with the over- whelming task of choosing which

  1. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    NASA Technical Reports Server (NTRS)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past years. I used the computer and office machines, and also worked with personnel in setting up a Cost Estimation Plan. I gained office experience in Word, Excel, and Power Point, with the completion of a variety of tasks. I made spreadsheets that pertained to the budget plan for Journey to Tomorrow, to name a few I have supported the office by tracking resource information: including programmatic travel, project budget at the center level to budgets for individual research sub-projects and grants. I also assisted the Program Support Office in their duties including, representing the office on numerous occasions on center-wide team/panels, such as the Space management committee, IFMP Budget Formulation, Journey to Tomorrow Committee, and the Vehicle Systems Program Business Process Team.

  2. 18 CFR 157.8 - Acceptance for filing or rejection of applications.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., the Director of the Office of Energy Projects or the Director of the Office of Energy Market... Projects or the Director of the Office of Energy Market Regulation may also reject an application after it... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR...

  3. 18 CFR 157.8 - Acceptance for filing or rejection of applications.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., the Director of the Office of Energy Projects or the Director of the Office of Energy Market... Projects or the Director of the Office of Energy Market Regulation may also reject an application after it... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR...

  4. 18 CFR 157.8 - Acceptance for filing or rejection of applications.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., the Director of the Office of Energy Projects or the Director of the Office of Energy Market... Projects or the Director of the Office of Energy Market Regulation may also reject an application after it... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR...

  5. 18 CFR 157.8 - Acceptance for filing or rejection of applications.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., the Director of the Office of Energy Projects or the Director of the Office of Energy Market... Projects or the Director of the Office of Energy Market Regulation may also reject an application after it... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR...

  6. 78 FR 20351 - Notice of Proposed Information Collection; Comment Request: Application for Multifamily Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... Information Collection; Comment Request: Application for Multifamily Project Mortgage Insurance AGENCY: Office...). FOR FURTHER INFORMATION CONTACT: Ted Toon, Director, Office of Multifamily Development, Department of... following information: Title of Proposal: Application for Multifamily Project Mortgage Insurance. OMB...

  7. 7 CFR 2.37 - Chief Information Officer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technology program or project. (3) Providing advice and other assistance to the Secretary and other senior... selection of agency Chief Information Officers and agency major information technology system project... recommendations to Agency Heads for the removal or replacement of information technology project managers, when...

  8. 40. INTERIOR VIEW TO THE SOUTHEAST OF ROOM 302, A ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. INTERIOR VIEW TO THE SOUTHEAST OF ROOM 302, A SMALL ISOLATED OFFICE ON THE THIRD FLOOR ON THE EAST SIDE OF THE DISASSEMBLY BAY. A METAL SPIRAL STAIRCASE IS IN THE SOUTHEAST CORNER AND HATCHWAYS ARE IN THE CEILING AND FLOOR TOWARD THE EAST SIDE OF THE ROOM. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV

  9. Economics in Counterinsurgency: Analyzing and Applying History’s Lessons on Economic Strategy

    DTIC Science & Technology

    2014-06-13

    Reconstruction and Humanitarian Affairs PCO Project and Contracting Office PRT Provincial Reconstruction Team SIGAR Special Inspector General for...and Contracting Office, or PCO , appear to have been unmindful of the historical ERP’s strengths and weaknesses. . . . One might say, without undue...purview of the US Embassy mission, which established the Iraqi Reconstruction and Management Office (IRMO) and the Project and Contracting Office ( PCO

  10. Project Manager Performance and the Decision to Backsource the Project Management Office

    ERIC Educational Resources Information Center

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  11. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    ERIC Educational Resources Information Center

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  12. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Director of the Office of Energy Projects. The cost limits for calendar year 2013, as published in Table I.... ACTION: Final rule. SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for...

  13. Office of Maternal and Child Health Active Projects FY 1989. An Annotated Listing.

    ERIC Educational Resources Information Center

    National Center for Education in Maternal and Child Health, Washington, DC.

    An annotated listing is presented of projects offering maternal and child health care services. These projects, referred to as special projects of regional and national significance (SPRANS), are supported by the Office of Maternal and Child Health of the Department of Health and Human Services. The first section provides information on services…

  14. 35. Photographic copy of historic photo, c1915 (original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Photographic copy of historic photo, c1915 (original print in Still Photo Branch of the National Archives, RG-155-JC, Washington, DC; photographer unknown). FRONT VIEW OF BOISE PROJECT OFFICE SHOWING UNITED STATES RECLAMATION SERVICE BOISE PROJECT CLERICAL AND ENGINEERING STAFF. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  15. 5 CFR 470.103 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Project means a project conducted by the Office of Personnel Management, or under its supervision, to... Federal personnel management (5 U.S.C. 4701). The project must require the waiver of a provision of law... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH...

  16. Contract Oversight for Redistribution Property Assistance Team Operations in Afghanistan Needs Improvement

    DTIC Science & Technology

    2015-05-18

    Aircraft Systems ( SUAS ) Project Office, located in Huntsville, AL, for reset. For return to the SUAS Project Office, 401st AFSB officials stated, the...representatives from SUAS Project Office contacted the 401st AFSB COR at BAF to state that the systems arrived in Huntsville, AL. However, prior to SUAS ...circumstances behind the loss. AC First’s research identified that AC First shipped the systems to SUAS officials at BAF instead of the BAF RPAT

  17. Office of Indian Affairs Progress Report, June 1977, State of New Mexico.

    ERIC Educational Resources Information Center

    New Mexico State Commission on Indian Affairs, Santa Fe.

    Included in this report on the New Mexico Office of Indian Affairs are brief sections dealing with: the Agency's background; past projects and future goals; the Research and Statistics Center; projects under consideration; and the Agency's Tribal Liaison Officer, Tribal Relations Specialist; and Planner. Cited as major Agency accomplishments…

  18. Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to the Enterprise

    DTIC Science & Technology

    2010-04-29

    Technology: From the Office Larry Smith Software Technology Support Center to the Enterprise 517 SMXS/MXDEA 6022 Fir Avenue Hill AFB, UT 84056 801...2010 to 00-00-2010 4. TITLE AND SUBTITLE Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to

  19. 48 CFR 1553.209-71 - EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer's Evaluation of Contractor Performance. 1553.209-71 Section 1553.209-71 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209-71 EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance. As prescribed in 1509.170-4...

  20. 78 FR 16476 - Notice for Termination of a Disease Management Demonstration Project for TRICARE Standard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Management Demonstration Project for TRICARE Standard Beneficiaries.'' The demonstration provided disease... DEPARTMENT OF DEFENSE Office of the Secretary Notice for Termination of a Disease Management Demonstration Project for TRICARE Standard Beneficiaries AGENCY: Office of the Secretary of Defense, (Health...

  1. 76 FR 5188 - Notice of Proposed Information Collection: Comment Request; Application for Multifamily Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Information Collection: Comment Request; Application for Multifamily Project Mortgage Insurance AGENCY: Office... Service (1-800-877-8339). FOR FURTHER INFORMATION CONTACT: Joyce Allen, Director, Office of Multifamily...: Application for Multifamily Project Mortgage Insurance. OMB Control Number, if applicable: 2502-0029...

  2. 77 FR 31302 - Review of Federal Permit Conditions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ...'' because the agency believes this should be interpreted based on the circumstances of the project at the... OFFICE OF THE FEDERAL COORDINATOR FOR ALASKA NATURAL GAS TRANSPORTATION PROJECTS Review of Federal... Projects. ACTION: Notice of Adoption of Final Policy. SUMMARY: The Office of the Federal Coordinator for...

  3. 36. Photographic copy of historic photo, c1915 (original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. Photographic copy of historic photo, c1915 (original print in Still Photo Branch of the National Archives, RG-155-JC, Washington, DC; photographer unknown). VIEW OF NORTH SIDE OF BOISE PROJECT OFFICE. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  4. Four-junction AlGaAs/GaAs laser power converter

    NASA Astrophysics Data System (ADS)

    Huang, Jie; Sun, Yurun; Zhao, Yongming; Yu, Shuzhen; Dong, Jianrong; Xue, Jiping; Xue, Chi; Wang, Jin; Lu, Yunqing; Ding, Yanwen

    2018-04-01

    Four-junction AlGaAs/GaAs laser power converters (LPCs) with n+-GaAs/p+-Al0.37Ga0.63As heterostructure tunnel junctions (TJs) have been designed and grown by metal-organic chemical vapor deposition (MOCVD) for converting the power of 808 nm lasers. A maximum conversion efficiency η c of 56.9% ± 4% is obtained for cells with an aperture of 3.14 mm2 at an input laser power of 0.2 W, while dropping to 43.3% at 1.5 W. Measured current–voltage (I–V) characteristics indicate that the performance of the LPC can be further improved by increasing the tunneling current density of TJs and optimizing the thicknesses of sub-cells to achieve current matching in LPC. Project financially supported by the National Natural Science Foundation of China (No. 61376065) and Zhongtian Technology Group Co. Ltd.

  5. 18 CFR 16.26 - Disposition of a project for which no timely application is filed following a notice of intent...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the Federal Power Act, the Director of the Office of Energy Projects will provide the existing... Office of Energy Projects. (c) Any application for surrender must be filed according to the approved... project for which no timely application is filed following a notice of intent not to file. 16.26 Section...

  6. 18 CFR 16.26 - Disposition of a project for which no timely application is filed following a notice of intent...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the Federal Power Act, the Director of the Office of Energy Projects will provide the existing... Office of Energy Projects. (c) Any application for surrender must be filed according to the approved... project for which no timely application is filed following a notice of intent not to file. 16.26 Section...

  7. 18 CFR 16.26 - Disposition of a project for which no timely application is filed following a notice of intent...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the Federal Power Act, the Director of the Office of Energy Projects will provide the existing... Office of Energy Projects. (c) Any application for surrender must be filed according to the approved... project for which no timely application is filed following a notice of intent not to file. 16.26 Section...

  8. 18 CFR 16.26 - Disposition of a project for which no timely application is filed following a notice of intent...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the Federal Power Act, the Director of the Office of Energy Projects will provide the existing... Office of Energy Projects. (c) Any application for surrender must be filed according to the approved... project for which no timely application is filed following a notice of intent not to file. 16.26 Section...

  9. 18 CFR 16.26 - Disposition of a project for which no timely application is filed following a notice of intent...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the Federal Power Act, the Director of the Office of Energy Projects will provide the existing... Office of Energy Projects. (c) Any application for surrender must be filed according to the approved... project for which no timely application is filed following a notice of intent not to file. 16.26 Section...

  10. 4. DETAIL OF EAST SIDE, SHOWING TRACK SUPERVISOR'S OFFICE PROJECTION. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. DETAIL OF EAST SIDE, SHOWING TRACK SUPERVISOR'S OFFICE PROJECTION. VIEW TO WEST. - Commercial & Industrial Buildings, Illinois Central Railroad Passenger Depot, Iowa & Jones Streets, Dubuque, Dubuque County, IA

  11. 40 CFR 35.936-16 - Code or standards of conduct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... provide for penalties, sanctions, or other adequate disciplinary actions to be instituted for project... their agents. The grantee must also inform the project officer of the prosecutive or disciplinary action... disciplinary action. Under § 30.245 of this subchapter, the project officer must notify the Director, EPA...

  12. 75 FR 45147 - Notice of Submission of Proposed Information Collection to OMB; Multifamily Project Construction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Proposed Information Collection to OMB; Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change; HUD Programs AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY.../borrowers, and mortgagees/lenders for construction of multifamily projects and to obtain approval of changes...

  13. 76 FR 56973 - Office of National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects AGENCY: Office of National Marine Sanctuaries (ONMS), National Oceanic and Atmospheric Administration (NOAA), Department of... Marine Sanctuaries (ONMS) has developed final policy and permitting guidance for submarine cable projects...

  14. 34 CFR 380.3 - What types of projects are authorized?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What types of projects are authorized? 380.3 Section 380.3 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS...

  15. EPA Region 10 Climate Change and TMDL Pilot Project - South Fork Nooksack River, Washington

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Region 10 and EPA’s Office of Research and Development (ORD) and Office of Water (OW) have launched a pilot research project to consider how projected climate change impacts could be incorporated into a TMDL and influence restoration...

  16. 16. Photocopy of original USRS photograph (from original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photocopy of original USRS photograph (from original print in the Umatilla Project History 1918, on file at National Archives, Rocky Mountain Region, Denver, Colorado) Photographer unknown, ca. 1918. Office of U.S. Reclamation Service - Hermiston, Umatilla Project, Oregon - Former Umatilla Project Headquarters Buildings, Office, Hermiston, Umatilla County, OR

  17. Office of the Chief Financial Officer Annual Report 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fernandez, Jeffrey

    2009-12-15

    Presented is the 2009 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office.

  18. SETA Support for the DARPA Microelectronics Technology Insertion Program of the Microelectronics Technology Office

    DTIC Science & Technology

    1992-08-17

    Conclusions. Key personnel planned and administered the 193-nm lithography SBIR workshop on May 7, 1992 as well as planned the GaAs Insertion...converters can use Josephson junctions (JJ) to improve performance. Superconductive quantum interference devices (SQUIDs), such as JJs, are used to form...forward control of a lithography stepper. Mark Conner at Booz-Allen has copies of the charts. You should take a few minutes to review them. I asked Costos

  19. Spatial geologic data model for the Gunnison, Grand Mesa, Uncompahgre National Forests mineral assessment area, southwestern Colorado and digital data for the Leadville, Montrose, Durango, and Colorado parts of the Grand Junction, Moab, and Cortez 1 degree x 2 degrees geologic maps

    USGS Publications Warehouse

    Day, W.C.; Green, G.N.; Knepper, D.H.; Phillips, R.C.

    1999-01-01

    The digital geologic and geographic information system (GIS) data presented here were prepared to aid in Grand Mesa, Uncompahgre, Gunnison National Forest (GMUG) mineral resource assessment Project studies by the U.S. Geological Survey Mineral Resource Program. The goals of the GMUG Project is to provide mineral resource data and an assessment for undiscovered mineral resources in U.S. Forest Service (USFS) and Bureau of Land Management (BLM) lands in southwestern Colorado. The Project area covers a large region in southwestern Colorado that is bounded by latitudes 37o 45’ to 39o 30’ north and longitudes 106o to 109o west. The study area is covered by all or parts of six 1o x2o topographic and quadrangle geologic maps, which include geologic maps for the Leadville (Tweto and others, 1978), Montrose (Tweto and others, 1976), Durango (Steven and others, 1974), Grand Junction (Cashion, 1973), Moab (Williams, 1976), and Cortez (Haynes and others, 1972) quadrangles. These geologic maps were used inasmuch as a complete remapping and compilation effort for this study area was beyond the scope of the Project.

  20. OPERATION HARDTACK. Project 3.5. Loading and Response of Submarine Hulls from Underwater Bursts

    DTIC Science & Technology

    1985-09-01

    Bursts H. L. Rich, Project Officer F. Weinberger E. T. Habib R. L. Bor W. J. Sette David Taylor Model Basin Washington, DC 15 December 1960 NOTICE: This...Hulls from Underwater Bursts, Extracted Version 12. PERSONAL AUTHOR(S) Rich, H.L., Project Officer; Weinberger, F.; Habib , E.T.; Bort, R.L.; Sette, W.J...SLO A D IN G oa n d R E S P O N S E o f S U B M A R IN E tULLS from UNDERWATER BURSTS H. L. Rich, Project Officer F. Weinberger E.T. Habib R.L. Bort W

  1. Effect of amino on spin-dependent transport through a junction of fused oligothiophenes between graphene electrodes

    NASA Astrophysics Data System (ADS)

    Cao, Liemao; Li, Xiaobo; Liu, Guang; Liu, Ziran; Zhou, Guanghui

    2017-05-01

    The influence of chemical side groups is significant in physical or chemical understanding the transport through the single molecular junction. Motivated by the recent successful fabrication and measurement of a single organic molecule sandwiched between graphene electrodes (Prins et al., 2011), here we study the spin-dependent transport properties through a junction of a fused oligothiophenes molecule embedded between two zigzag-edged graphene nanoribbon (ZGNR) electrodes. The molecule with and without an attached amino NH2 side group is considered, respectively, and external magnetic fields or FM stripes are applied onto the ZGNRs to initially orient the magnetic alignment of the electrodes for the spin-dependent consideration. By the ab initio calculations based on the density functional theory combined with nonequilibrium Green's function formalism, we have demonstrated the remarkable difference in the spin-charge transport property between the junctions of the molecule with and without NH2 side group. In particular, the junction with side group shows more obvious NDR. In addition, it exhibits an interesting dual spin-filtering effect when the magnetic alignment in electrodes is initially antiparallel-oriented. The mechanisms of the results are revealed and discussed in terms of the spin-resolved transmission spectrum associated with the frontier molecular orbitals evolution, the molecular projected self-consistent Hamiltonian eigenvalues, and the local density of states.

  2. Aberrant activity in retinal degeneration impairs central visual processing and relies on Cx36-containing gap junctions.

    PubMed

    Ivanova, Elena; Yee, Christopher W; Baldoni, Robert; Sagdullaev, Botir T

    2016-09-01

    In retinal degenerative disease (RD), the diminished light signal from dying photoreceptors has been considered the sole cause of visual impairment. Recent studies show a 10-fold increase in spontaneous activity in the RD network, challenging this paradigm. This aberrant activity forms a new barrier for the light signal, and not only exacerbates the loss of vision, but also may stand in the way of visual restoration. This activity originates in AII amacrine cells and relies on excessive activation of gap junctions. However, it remains unclear whether aberrant activity affects central visual processing and what mechanisms lead to this excessive activation of gap junctions. By combining genetic manipulation with electrophysiological recordings of light-induced activity in both living mice and isolated wholemount retina, we demonstrate that aberrant activity extends along retinotectal projections to alter activity in higher brain centers. Next, to selectively eliminate Cx36-containing gap junctions, which are the primary type expressed by AII amacrine cells, we crossed rd10 mice, a slow-degenerating model of RD, with Cx36 knockout mice. We found that retinal aberrant activity was reduced in the rd10/Cx36KO mice compared to rd10 controls, a direct evidence for involvement of Cx36-containing gap junctions in generating aberrant activity in RD. These data provide an essential support for future experiments to determine if selectively targeting these gap junctions could be a valid strategy for reducing aberrant activity and restoring light responses in RD. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. A Robust Cooling Platform for NIS Junction Refrigeration and sub-Kelvin Cryogenic Systems

    NASA Astrophysics Data System (ADS)

    Wilson, B.; Atlas, M.; Lowell, P.; Moyerman, S.; Stebor, N.; Ullom, J.; Keating, B.

    2014-08-01

    Recent advances in Normal metal-insulator-superconductor (NIS) tunnel junctions (Clark et al. Appl Phys Lett 86: 173508, 2005, Appl Phys Lett 84: 4, 2004) have proven these devices to be a viable technology for sub-Kelvin refrigeration. NIS junction coolers, coupled to a separate cold stage, provide a flexible platform for cooling a wide range of user-supplied payloads. Recently, a stage was cooled from 290 to 256 mK (Lowell et al. Appl Phys Lett 102: 082601 2013), but further mechanical and electrical improvements are necessary for the stage to reach its full potential. We have designed and built a new Kevlar suspended cooling platform for NIS junction refrigeration that is both lightweight and well thermally isolated; the calculated parasitic loading is pW from 300 to 100 mK. The platform is structurally rigid with a measured deflection of 25 m under a 2.5 kg load and has an integrated mechanical heat switch driven by a superconducting stepper motor with thermal conductivity G W/K at 300 mK. An integrated radiation shield limits thermal loading and a modular platform accommodates enough junctions to provide nanowatts of continuous cooling power. The compact stage size of 7.6 cm 8.6 cm 4.8 cm and overall radiation shield size of 8.9 cm 10.0 cm 7.0 cm along with minimal electrical power requirements allow easy integration into a range of cryostats. We present the design, construction, and performance of this cooling platform as well as projections for coupling to arrays of NIS junctions and other future applications.

  4. 34 CFR 75.112 - Include a proposed project period and a timeline.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Include a proposed project period and a timeline. 75.112 Section 75.112 Education Office of the Secretary, Department of Education DIRECT GRANT PROGRAMS... to meet each objective of the project. (Approved by the Office of Management and Budget under control...

  5. 18 CFR 16.5 - Site access for a competing applicant.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... in providing access, including energy generation lost as a result of modification of project... the Office of Energy Projects for resolution in the manner specified in § 16.8(b)(5) prior to the... access may be referred to the Director of the Office of Energy Projects for resolution in the manner...

  6. 18 CFR 157.205 - Notice procedure.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Director of the Office of Energy Projects shall reject within 10 days of the date of filing a request which... Energy Projects or his designee. If a protest is not withdrawn or dismissed pursuant to paragraph (g) of... Office of Energy Projects will dismiss that protest if it does not raise a substantive issue and fails to...

  7. 18 CFR 16.5 - Site access for a competing applicant.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... in providing access, including energy generation lost as a result of modification of project... the Office of Energy Projects for resolution in the manner specified in § 16.8(b)(5) prior to the... access may be referred to the Director of the Office of Energy Projects for resolution in the manner...

  8. 18 CFR 16.5 - Site access for a competing applicant.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... in providing access, including energy generation lost as a result of modification of project... the Office of Energy Projects for resolution in the manner specified in § 16.8(b)(5) prior to the... access may be referred to the Director of the Office of Energy Projects for resolution in the manner...

  9. 18 CFR 157.205 - Notice procedure.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Director of the Office of Energy Projects shall reject within 10 days of the date of filing a request which... Energy Projects or his designee. If a protest is not withdrawn or dismissed pursuant to paragraph (g) of... Office of Energy Projects will dismiss that protest if it does not raise a substantive issue and fails to...

  10. 18 CFR 157.205 - Notice procedure.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Director of the Office of Energy Projects shall reject within 10 days of the date of filing a request which... Energy Projects or his designee. If a protest is not withdrawn or dismissed pursuant to paragraph (g) of... Office of Energy Projects will dismiss that protest if it does not raise a substantive issue and fails to...

  11. 18 CFR 157.205 - Notice procedure.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Director of the Office of Energy Projects shall reject within 10 days of the date of filing a request which... Energy Projects or his designee. If a protest is not withdrawn or dismissed pursuant to paragraph (g) of... Office of Energy Projects will dismiss that protest if it does not raise a substantive issue and fails to...

  12. 18 CFR 16.5 - Site access for a competing applicant.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... in providing access, including energy generation lost as a result of modification of project... the Office of Energy Projects for resolution in the manner specified in § 16.8(b)(5) prior to the... access may be referred to the Director of the Office of Energy Projects for resolution in the manner...

  13. 18 CFR 157.205 - Notice procedure.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Director of the Office of Energy Projects shall reject within 10 days of the date of filing a request which... Energy Projects or his designee. If a protest is not withdrawn or dismissed pursuant to paragraph (g) of... Office of Energy Projects will dismiss that protest if it does not raise a substantive issue and fails to...

  14. 18 CFR 16.5 - Site access for a competing applicant.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... in providing access, including energy generation lost as a result of modification of project... the Office of Energy Projects for resolution in the manner specified in § 16.8(b)(5) prior to the... access may be referred to the Director of the Office of Energy Projects for resolution in the manner...

  15. Preliminary Evaluation of Office of Academic Achievement's Programs 1990-1991. Report No. 91-4.

    ERIC Educational Resources Information Center

    Swanson, Judy

    Three programs sponsored by the Seattle (Washington) public schools' Office of Academic Achievement were evaluated: the Academic Achievement Project, Early Childhood Model (ECM) Schools, and Pilot Projects. Academic Achievement projects were designed to increase the academic achievement of at-risk learners and to decrease disproportionality. The…

  16. Manpower Training Coordinators Project. Final Report. Experimental Project in Vocational Education.

    ERIC Educational Resources Information Center

    Smith, E. Jimmy

    On June 1, 1980, the South Carolina Department of Education, Office of Vocational Education, entered into a contractual agreement with the Governor's Office, CETA Division, for the purpose of operating a Manpower Training Coordinators Program in 10 school districts serving rural areas. The project was designed to establish and maintain effective…

  17. PGIS (Project Grant Information System) Taxonomy [Rough Draft].

    ERIC Educational Resources Information Center

    North American Rockwell Information Systems Co., Arlington, VA.

    The Project Grant Information System (PGIS) is a computerized information indexing and retrieval system which supports the U.S. Office of Education. Its purpose is to provide OE officials with up-to-date information about the Office's discretionary grant programs and projects. The purpose of the Taxonomy is to provide: (1) those individuals who…

  18. 34 CFR 379.1 - What is the Projects With Industry (PWI) program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the Projects With Industry (PWI) program? 379.1 Section 379.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY General...

  19. 34 CFR 376.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What types of projects are authorized under this program? 376.10 Section 376.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS...

  20. 34 CFR 376.1 - What is the program of Special Projects and Demonstrations for Providing Transitional...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the program of Special Projects and....1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS FOR...

  1. 34 CFR 388.3 - What types of projects are authorized?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What types of projects are authorized? 388.3 Section 388.3 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF... UNIT IN-SERVICE TRAINING General § 388.3 What types of projects are authorized? State vocational...

  2. Building Bridges: Using the Office Consultation Project to Connect Students to Theory and Practice

    ERIC Educational Resources Information Center

    Wawrzynski, Korine Steinke; Jessup-Anger, Jody E.

    2014-01-01

    The Office Consultation Project is an innovative capstone project that partners graduate students in student affairs preparation programs with academic and student affairs practitioners. It provides an opportunity for students to apply research and scholarship to practical settings, while giving practitioners new insight into their units,…

  3. 34 CFR 645.12 - How are regular Upward Bound projects organized?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false How are regular Upward Bound projects organized? 645.12 Section 645.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION UPWARD BOUND PROGRAM What Kinds of Projects and Services Does...

  4. Denver Radium Site -- Operable Unit X closeout report for the US Environmental Protection Agency

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The Denver Radium Site consists of properties in the Denver area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 groups or operable units'' to facilitate remedial action management of the Site. Under the provisions of the Superfund Amendments and Reauthorization Act (SARA) of 1986, the US Environmental Protection Agency (EPA) is authorized to respond to a release of a hazardous substance or to a substantial threat of such a release into the environment. EPA or the state conducts a site inspection and uses the Hazard Ranking System to determine placement onmore » the EPA National Priorities List (NPL). In 1983, EPA placed the Denver Radium Site on the NPL, making it eligible for cleanup under the EPA Superfund Program. Through a series of interagency agreements,EPA has enlisted the support of the US Department of Energy Grand junction Projects Office and Chem-Nuclear Geotech, Inc., for remedial design and remedial action activities at the Denver Radium Superfund Site.The US Bureau of Reclamation (USBR) is managing the waste transportation and disposal contract.« less

  5. Denver Radium Site -- Operable Unit X closeout report for the US Environmental Protection Agency

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The Denver Radium Site consists of properties in the Denver area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 groups or ``operable units`` to facilitate remedial action management of the Site. Under the provisions of the Superfund Amendments and Reauthorization Act (SARA) of 1986, the US Environmental Protection Agency (EPA) is authorized to respond to a release of a hazardous substance or to a substantial threat of such a release into the environment. EPA or the state conducts a site inspection and uses the Hazard Ranking System to determine placement onmore » the EPA National Priorities List (NPL). In 1983, EPA placed the Denver Radium Site on the NPL, making it eligible for cleanup under the EPA Superfund Program. Through a series of interagency agreements,EPA has enlisted the support of the US Department of Energy Grand junction Projects Office and Chem-Nuclear Geotech, Inc., for remedial design and remedial action activities at the Denver Radium Superfund Site.The US Bureau of Reclamation (USBR) is managing the waste transportation and disposal contract.« less

  6. Region 9 Tribal Grant Program - Project Officer and Tribal Contact Information Map Service

    EPA Pesticide Factsheets

    This compilation of geospatial data is for the purpose of managing and communicating information about current EPA project officers, tribal contacts, and tribal grants, both internally and with external stakeholders.

  7. EHS and FME Lend Their Expertise to NCI Campus Refurbishment Project | Poster

    Cancer.gov

    In October 2015, the NCI executive officer and the director of NCI’s Office of Space and Facilities Management (OSFM) announced a wide-ranging refurbishment plan for NCI at Frederick. Since then, a project team comprising members from the Office of Scientific Operations, the Management Operations Support Branch, OSFM, the Center for Cancer Research, the Environment, Health,

  8. Managment and construction of the Large Binocular Telescope enclosure: Meeting unusual challenges with a competitive discipline

    NASA Astrophysics Data System (ADS)

    Slagle, James H.; Hill, John M.; Davison, Warren B.; Hart, Wood; Teran, Jose U.

    1998-08-01

    Planning, estimating, and building a telescope and its enclosure within a budget is a challenge to any project staff. The Large Binocular Telescope (LBT) project office goal has been to break every phase of the project into small packages and competitively bid the packages. In this way the project office can minimize costs and keep the project budget from escalating out of control. This paper will discuss both the unique and common problems associated with the building of telescopes into the next millennium. The discussion is centered on the planning and execution phases of construction for the LBT, located on Mt. Graham in Arizona. The paper will discuss the effects of delays on the actual start of the telescope due to environmental issues and the impact the delays had on design and budget. The paper will provide the solutions that have been incorporated by the LBT project office to maximize the quality of construction while holding costs to a minimum. The use of a team approach by the contractors, engineers, and the project office has been successful in maintaining quality construction at a reasonable cost.

  9. The project management office: transforming healthcare in the context of a hospital redevelopment project.

    PubMed

    Richer, Marie-Claire; Marchionni, Caroline; Lavoie-Tremblay, Melanie; Aubry, Monique

    2013-01-01

    It has been shown that classifying projects into a typology allows improved allocation of resources and promotes project success. However, a typology of healthcare projects has yet to be developed. The projects encountered by the Transition Support Office at the McGill University Health Centre in Montreal, Quebec, where a major redevelopment project is under way, were classified into a typology unique to the healthcare context. Examples of the 3 project types, Process, People, and Practice, are provided to clarify the specific support strategies and context-adapted interventions that were instrumental to their success.

  10. Goddard visit

    NASA Image and Video Library

    2011-07-21

    A trio of representatives from Goddard Space Flight Center in Greenbelt, Md., visited Stennis Space Center on July 21-22 to explore opportunities for collaboration. Visitors and hosts included: (seated, l to r) Shahid Habib, chief of the Goddard Office of Applied Sciences; Stennis Director Patrick Scheuermann; Piers Sellers, deputy director of the Goddard Sciences and Exploration Directorate; (standing, l to r) Duane Armstrong, chief of the Stennis Applied Science & Technology Project Office; Fritz Policelli, representative of the Goddard Office of Applied Sciences; Anne Peek, assistant director of the Stennis Project Directorate; and Keith Brock, director of the Stennis Project Directorate.

  11. Effects of oxygen-inserted layers on diffusion of boron, phosphorus, and arsenic in silicon for ultra-shallow junction formation

    NASA Astrophysics Data System (ADS)

    Zhang, X.; Connelly, D.; Takeuchi, H.; Hytha, M.; Mears, R. J.; Rubin, L. M.; Liu, T.-J. K.

    2018-03-01

    The effects of oxygen-inserted (OI) layers on the diffusion of boron (B), phosphorus (P), and arsenic (As) in silicon (Si) are investigated, for ultra-shallow junction formation by high-dose ion implantation followed by rapid thermal annealing. The projected range (Rp) of the implanted dopants is shallower than the depth of the OI layers. Secondary ion mass spectrometry is used to compare the dopant profiles in silicon samples that have OI layers against the dopant profiles in control samples that do not have OI layers. Diffusion is found to be substantially retarded by the OI layers for B and P, and less for As, providing shallower junction depth. The experimental results suggest that the OI layers serve to block the diffusion of Si self-interstitials and thereby effectively reduce interstitial-aided diffusion beyond the depth of the OI layers. The OI layers also help to retain more dopants within the Si, which technology computer-aided design simulations indicate to be beneficial for achieving shallower junctions with lower sheet resistance to enable further miniaturization of planar metal-oxide-semiconductor field-effect transistors for improved integrated-circuit performance and cost per function.

  12. Adiabatic quantum pump in a zigzag graphene nanoribbon junction

    NASA Astrophysics Data System (ADS)

    Zhang, Lin

    2015-11-01

    The adiabatic electron transport is theoretically studied in a zigzag graphene nanoribbon (ZGNR) junction with two time-dependent pumping electric fields. By modeling a ZGNR p-n junction and applying the Keldysh Green’s function method, we find that a pumped charge current is flowing in the device at a zero external bias, which mainly comes from the photon-assisted tunneling process and the valley selection rule in an even-chain ZGNR junction. The pumped charge current and its ON and OFF states can be efficiently modulated by changing the system parameters such as the pumping frequency, the pumping phase difference, and the Fermi level. A ferromagnetic ZGNR device is also studied to generate a pure spin current and a fully polarized spin current due to the combined spin pump effect and the valley valve effect. Our finding might pave the way to manipulate the degree of freedom of electrons in a graphene-based electronic device. Project supported by the National Natural Science Foundation of China (Grant No. 110704033), the Natural Science Foundation of Jiangsu Province, China (Grant No. BK2010416), and the Natural Science Foundation for Colleges and Universities in Jiangsu Province, China (Grant No. 13KJB140005).

  13. Geothermal Technologies Office 2012 Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2013-04-01

    On May 7-10, 2012, the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Geothermal Technologies Office conducted its annual program peer review in Westminster, CO. In accordance with the EERE Peer Review Guide, the review provides an independent, expert evaluation of the strategic goals and direction of the office and is a forum for feedback and recommendations on future office planning. The purpose of the review was to evaluate DOE-funded projects for their contribution to the mission and goals of the office and to assess progress made against stated objectives. Project scoring results, expert reviewer comments, andmore » key findings and recommendations are included in this report.« less

  14. Space Shuttle Projects Overview to Columbia Air Forces War College

    NASA Technical Reports Server (NTRS)

    Singer, Jody; McCool, Alex (Technical Monitor)

    2000-01-01

    This paper presents, in viewgraph form, a general overview of space shuttle projects. Some of the topics include: 1) Space Shuttle Projects; 2) Marshall Space Flight Center Space Shuttle Projects Office; 3) Space Shuttle Propulsion systems; 4) Space Shuttle Program Major Sites; 5) NASA Office of Space flight (OSF) Center Roles in Space Shuttle Program; 6) Space Shuttle Hardware Flow; and 7) Shuttle Flights To Date.

  15. DISCRETE TUNNELING CURRENT FLUCTUATIONS IN METAL-WATER-METAL TUNNEL JUNCTIONS. (R829623)

    EPA Science Inventory

    The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...

  16. User delay costs due to work zone operations Near Echo Junction.

    DOT National Transportation Integrated Search

    2010-11-01

    With the increasing number of road rehabilitation projects across the United States, the need to reduce user costs due to congestion is more important than ever. The Utah Department of Transportation (UDOT) has proposed replacing two I-80 bridges ove...

  17. Lessons learned from first year cistern monitoring in Camden ...

    EPA Pesticide Factsheets

    Invited panelist for Webinar 08/16/2016 by Office of Water : Lessons Learned from Past Green Infrastructure Projects Invited panelist for Webinar 08/16/2016 by Office of Water : Lessons Learned from Past Green Infrastructure Projects

  18. Report: EPA Managers Did Not Hold Supervisors and Project Officers Accountable for Grants Management

    EPA Pesticide Factsheets

    Report #2005-P-00027, September 27, 2005. Managers did not sufficiently hold supervisors and project officers accountable for grants management because there is no process to measure most grants management activity.

  19. [Architectural ultrastructure of the human urinary transitional epithelium].

    PubMed

    Takayama, H; Konishi, T

    1984-07-01

    Human urinary bladder mucosa, confirmed to be normal by cystoscopic, histologic and bacteriologic examination, were obtained from four patients at prostatectomy and from two patients at an anti-VUR procedure. The luminal surface and the three dimensional architecture of the bladder mucosa were observed by scanning electron microscopy (SEM) after cryofracture of specimen and by transmission electron microscopy (TEM). The epithelium consists of superficial, intermediate and basal cells, and SEM and TEM showed that it was stratified. Intermediate cells reached the basal lamina by slender cytoplasmic processes but superficial cells were not directly in contact with the basal lamina. No pleomorphic or long microvilli were observed but short microvilli or granular protrusions were sparsely seen on the luminal surface of superficial cells. SEM of cryofractured surfaces revealed that cells from each cell layer were in contact with cellular junctions such as ridges, plicated projections and septum-like walls. Their junctions were more complicated with increasing depth of the cell layer. No pleomorphic or long microvilli were observed on any cell surface of the intermediate or basal cell layer. Under TEM, however, these junctional structures of ridges, plicated projections and septal walls appeared to be microvilli under TEM. Microvilli-like structures on TEM, therefore, have to be carefully distinguished from real microvilli. Careful observation is required when the presence of cells covered with microvilli is described as a sign of malignancy.

  20. Research and Grant Management: The Role of the Project Management Office (PMO) in a European Research Consortium Context

    ERIC Educational Resources Information Center

    Wedekind, Gerben Kristian; Philbin, Simon Patrick

    2018-01-01

    This paper illustrates how a university-based project management office (PMO) can provide focused support across the entire grant project lifecycle within a European research context. In recent years, EU (European Union) research and innovation grant programs have increasingly shifted to support multidisciplinary consortia composed of industry,…

  1. 34 CFR 380.1 - What is the program of special projects and demonstrations for providing supported employment...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the program of special projects and... technical assistance projects? 380.1 Section 380.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION...

  2. 4. Photographic copy of map. San Carlos Irrigation Project, Gila ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photographic copy of map. San Carlos Irrigation Project, Gila River Indian Reservation, Pinal County, Arizona. Department of the Interior. Office of Indian Affairs. 1940. (Source: SCIP Office, Coolidge, AZ) Photograph is an 8'x10' enlargement from a 4'x5' negative. - San Carlos Irrigation Project, Lands North & South of Gila River, Coolidge, Pinal County, AZ

  3. 2017 Building Technologies Office Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The 2017 Building Technologies Office Peer Review Report summarizes the feedback submitted by reviewers for the 109 Building Technologies Office (BTO) projects presented at the 2017 BTO Peer Review. The report presents an overview of the goals and activities under each technology program area, a summary of project scores for each program, and a brief analysis of general evaluation trends within each program area or its constituent subprograms.

  4. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  5. Chemical research projects office: An overview and bibliography, 1975-1980

    NASA Technical Reports Server (NTRS)

    Kourtides, D. A.; Heimbuch, A. H.; Parker, J. A.

    1980-01-01

    The activities of the Chemical Research Projects Office at Ames Research Center, Moffett Field, California are reported. The office conducts basic and applied research in the fields of polymer chemistry, computational chemistry, polymer physics, and physical and organic chemistry. It works to identify the chemical research and technology required for solutions to problems of national urgency, synchronous with the aeronautic and space effort. It conducts interdisciplinary research on chemical problems, mainly in areas of macromolecular science and fire research. The office also acts as liaison with the engineering community and assures that relevant technology is made available to other NASA centers, agencies, and industry. Recent accomplishments are listed in this report. Activities of the three research groups, Polymer Research, Aircraft Operating and Safety, and Engineering Testing, are summarized. A complete bibliography which lists all Chemical Research Projects Office publications, contracts, grants, patents, and presentations from 1975 to 1980 is included.

  6. 7 CFR 2.24 - Assistant Secretary for Administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... continue, modify, or terminate an information technology program or project. (iii) Provide advice and other... exchange, scheduling, computer conferencing, televideo technologies, and other applications of office... Chief Information Officers and agency major information technology system project managers in accordance...

  7. 7 CFR 2.24 - Assistant Secretary for Administration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... continue, modify, or terminate an information technology program or project. (iii) Provide advice and other... exchange, scheduling, computer conferencing, televideo technologies, and other applications of office... Chief Information Officers and agency major information technology system project managers in accordance...

  8. Hydrothermal Exploration at the Chile Triple Junction - ABE's last adventure?

    NASA Astrophysics Data System (ADS)

    German, C. R.; Shank, T. M.; Lilley, M. D.; Lupton, J. E.; Blackman, D. K.; Brown, K. M.; Baumberger, T.; Früh-Green, G.; Greene, R.; Saito, M. A.; Sylva, S.; Nakamura, K.; Stanway, J.; Yoerger, D. R.; Levin, L. A.; Thurber, A. R.; Sellanes, J.; Mella, M.; Muñoz, J.; Diaz-Naveas, J. L.; Inspire Science Team

    2010-12-01

    In February and March 2010 we conducted preliminary exploration for hydrothermal plume signals along the East Chile Rise where it intersects the continental margin at the Chile Triple Junction (CTJ). This work was conducted as one component of our larger NOAA-OE funded INSPIRE project (Investigation of South Pacific Reducing Environments) aboard RV Melville cruise MV 1003 (PI: Andrew Thurber, Scripps) with all shiptime funded through an award of the State of California to Andrew Thurber and his co-PI's. Additional support came from the Census of Marine Life (ChEss and CoMarge projects). At sea, we conducted a series of CTD-rosette and ABE autonomous underwater vehicle operations to prospect for and determine the nature of any seafloor venting at, or adjacent to, the point where the the East Chile Rise subducts beneath the continental margin. Evidence from in situ sensing (optical backscatter, Eh) and water column analyses of dissolved CH4, δ3He and TDFe/TDMn concentrations document the presence of two discrete sites of venting, one right at the triple junction and the other a further 10km along axis, north of the Triple Junction, but still within the southernmost segment of the East Chile Rise. From an intercomparison of the abundance of different chemical signals we can intercompare likely characteristics of these differet source sites and also differentiate between them and the high methane concentrations released from cold seep sites further north along the Chile Margin, both with the CTJ region and also at the Concepcion Methane Seep Area (CMSA). This multi-disciplinary and international collaboration - involving scientists from Chile, the USA, Europe and Japan - can serve as an excellent and exciting launchpoint for wide-ranging future investigations of the Chile Triple Junction area - the only place on Earth where an oceanic spreading center is being actively subducted beneath a continent and also the only place on Earth where all known forms of deep-sea chemically-reducing ecosystem (hydrothermal vents, cold seeps, oxygen minimum zones and large organic falls) have the potential to co-exist.

  9. ACTT workshop, Wyoming : September 21-22, 2004, DuBois, Wyoming

    DOT National Transportation Integrated Search

    2005-01-01

    The primary objective of the workshop was to draw on the expertise of participants to help WYDOT achieve its goal of minimizing construction time for its US-287/26, between Moran Junction and Dubois. The $100 million project is to reconstruct this 37...

  10. 75 FR 13134 - Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ...)(6). Grant applications for the Medical Liability and Safety Innovation Projects (R21) applications... disclosure under the above- cited statutes. SEP Meeting on: Medical Liability and Safety Innovation Projects..., Committee Management Officer, Office of Extramural Research, Education and Priority Populations, AHRQ, 540...

  11. 7 CFR 2.89 - Chief Information Officer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... continue, modify, or terminate an information technology program or project. (3) Provide advice and other..., computer conferencing, televideo technologies, and other applications of office automation technology which... technology system project managers in accordance with OMB policies. (iv) Providing recommendations to Agency...

  12. 5 CFR 470.315 - Project modification and extension.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....315 Section 470.315 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to... plan without the approval of the Office of Personnel Management. OPM will inform the agency of...

  13. 7 CFR 2.89 - Chief Information Officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... continue, modify, or terminate an information technology program or project. (3) Provide advice and other..., computer conferencing, televideo technologies, and other applications of office automation technology which... technology system project managers in accordance with OMB policies. (iv) Providing recommendations to Agency...

  14. Artificial Icing Test, Utility Tactical Transport Aircraft System (UTTAS), Boeing Vertol YUH-61A Helicopter

    DTIC Science & Technology

    1977-01-01

    FOR OFFIC!AL USE ONLY VTT 0ff4 -40. -26-: a 20 TEMPATURE (-Q FIGUR~E t:. VMRATIOI4 (W THEMMONMIC FUNCTIOUt WITfLt -EA~UrT IOMMI4MTSRS- SOMiRE; jym...JOHN F. HAGEN MAJ, FA US ARMY JAMES C. O’CONNOR PROJECT OFFICER/PILOT CPT, CE US ARMY EDWARD J. TAVARES PROJECT PILOT CPT, TC US ARMY PROJECT...is no longer needed. Do not return it to the originator. TRADE NAMES The use of trade names in this report does not constitute an official endorsement

  15. 34 CFR 644.3 - Who is eligible to participate in a project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Who is eligible to participate in a project? 644.3 Section 644.3 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION EDUCATIONAL OPPORTUNITY CENTERS General § 644.3 Who is eligible to participate in a project? (a) An...

  16. 34 CFR 643.3 - Who is eligible to participate in a project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Who is eligible to participate in a project? 643.3 Section 643.3 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION TALENT SEARCH General § 643.3 Who is eligible to participate in a project? (a) An individual is...

  17. Triple Junction Reorganizations: A Mechanism for the Initiation of the Great Pacific Fractures Zones

    NASA Astrophysics Data System (ADS)

    Pockalny, R. A.; Larson, R. L.; Grindlay, N. R.

    2001-12-01

    There are two general explanations for the initiation of oceanic transform faults that eventually evolve into fracture zones: transforms inherited from continental break-up and transforms acquired in response to a change in plate motions. These models are sufficient to explain the fracture zones in oceans formed by continental break-up. However, neither model accounts for the initiation of the large-offset, great Pacific fracture zones that characterized the Pacific-Farallon plate boundary prior to 25 Ma. Primarily, these models are unable to explain why the initial age of these fracture zones becomes progressively younger from the Mendocino fracture zone (\\~{ } 160 Ma) southward down to the Resolution FZ (\\~{ }84 Ma). We propose a new transform initiation mechanism for the great Pacific fracture zones, which is intimately tied to tectonic processes at triple junctions and directly related to the growth of the Pacific Plate. Recently acquired multibeam bathymetry and marine geophysics data collected along Pandora's Escarpment in the southwestern Pacific have identified the escarpment as the trace of the Pacific-Farallon-Phoenix triple junction on the Pacific Plate. Regional changes in the trend of the triple junction trace between 84-121 Ma roughly coincide with the initiation of the Marquesas, Austral and Resolution fracture zones. Bathymetry and backscatter data from the projected intersections of these fracture zones with the triple junction trace identify several anomalous structures that suggest tectonic reorganizations of the triple junction. We believe this reorganization created the initial transform fault(s) that ultimately became the large-offset, great Pacific fracture zones. Several possible mechanisms for initiating the transform faults are explored including microplate formation, ridge-tip propagation, and spontaneous transform fault formation.

  18. The Lunar Lander "HabiTank" Concept

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.

    2007-01-01

    This paper will summarize the study that was conducted under the auspices of the National Aeronautics and Space Administration (NASA), lead by Johnson Space Center s Engineering Directorate in support of the Lunar Lander Preparatory Study (LLPS) as sponsored by the Constellation Program Office (CxPO), Advanced Projects Office (APO). The lunar lander conceptual design and analysis is intended to provide an understanding of requirements for human space exploration of the Moon using the Advanced Projects Office Pre-Lander Project Office selected "HabiTank" Lander concept. In addition, these analyses help identify system "drivers," or significant sources of cost, performance, risk, and schedule variation along with areas needing technology development. Recommendations, results, and conclusions in this paper do not reflect NASA policy or programmatic decisions. This paper is an executive summary of this study.

  19. Research and Development of Silicon Carbide (SiC) Junction Recovery Diodes for Picosecond Range, High Power Opening Switches

    NASA Astrophysics Data System (ADS)

    Grekhov, Igor V.

    2002-07-01

    This report results from a contract tasking Ioffe Institute as follows: The purpose of the proposed project is to develop, fabricate, test, and characterize silicon carbide power semiconductor opening switches operating in the picosecond range of switch time. Special SiC diode structures will be fabricated and investigated, including Junction Recovery Diodes (JRD). The operation of such diodes is founded on the superfast recovery of the junction's blocking ability after switching the device from forward to reverse bias conditions. Our estimations show that the parameters of JRD devices can be substantially improved in case of SiC devices, compared to both Si and GaAs capabilities. We expect i) to increase the speed of switch operation, the specific commutated power, and the operation frequency repetition; ii) to reduce the weight and size of pulse devices; and iii) to achieve better reliability of the devices due to the unique thermal conductivity and radiation hardness of SiC.

  20. 40 CFR 1.33 - Office of Administration and Resources Management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce... out human resources management projects of special interest to Agency management. The Office... Management. 1.33 Section 1.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL STATEMENT OF...

  1. 40. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). ROOF PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  2. 38. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). FIRST FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  3. 37. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). BASEMENT PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  4. 39. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). SECOND FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  5. 45. Photographic copy of original construction drawing, dated 16 February ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photographic copy of original construction drawing, dated 16 February 1916 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). LOT SURVEY. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  6. 41. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). CROSS SECTIONS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  7. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  8. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  9. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  10. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  11. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  12. Low cost solar array project: Cell and module formation research area. Process research of non-CZ silicon material

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Meniscus coates tests, back junction formation using a new boron containing liquid, tests of various SiO2 and boron containing liquids, pelletized silicon for replenishment during web growth, and ion implantation compatibility/feasibility study are discussed.

  13. 17. VIEW OF THE END OF THE PROPOSED CONSTRUCTION ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. VIEW OF THE END OF THE PROPOSED CONSTRUCTION ON THE GENOA PEAK ROAD. AT THIS JUNCTION WITH FOREST SERVICE ROAD 14N32B, THE ROAD WILL BE REALIGNED TO ACCOMMODATE LOGGING TRUCKS ENTERING PROJECT LIMITS. - Genoa Peak Road, Glenbrook, Douglas County, NV

  14. Process research of non-cz silicon material. Low cost solar array project, cell and module formation research area

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Liquid diffusion masks and liquid applied dopants to replace the CVD Silox masking and gaseous diffusion operations specified for forming junctions in the Westinghouse baseline process sequence for producing solar cells from dendritic web silicon were investigated.

  15. User's operating procedures. Volume 1: Scout project information programs

    NASA Technical Reports Server (NTRS)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  16. High Field Side Lower Hybrid Current Drive Launcher Design for DIII-D

    NASA Astrophysics Data System (ADS)

    Wallace, G. M.; Leccacori, R.; Doody, J.; Vieira, R.; Shiraiwa, S.; Wukitch, S. J.; Holcomb, C.; Pinsker, R. I.

    2017-10-01

    Efficient off-axis current drive scalable to reactors is a key enabling technology for a steady-state tokamak. Simulations of DIII-D discharges have identified high performance scenarios with excellent lower hybrid (LH) wave penetration, single pass absorption and high current drive efficiency. The strategy was to adapt known launching technology utilized in previous experiments on C-Mod (poloidal splitter) and Tore Supra (bi-junction) and remain within power density limits established in JET and Tore Supra. For a 2 MW source power antenna, the launcher consists of 32 toroidal apertures and 4 poloidal rows. The aperture is 60 mm x 5 mm with 1 mm septa and the peak n| | is 2.7+/-0.2 for 90□ phasing. Eight WR187 waveguides are routed from the R-1 port down under the lower cryopump, under the existing divertor, and up the central column with the long waveguide dimension along the vacuum vessel. Above the inner strike point region, each waveguide is twisted to orient the long dimension perpendicular to the vacuum vessel and splits into 4 toroidal apertures via bi-junctions. To protect the waveguide, the inner wall radius will need to increase by 2.5 cm. RF, disruption, and thermal analysis of the latest design will be presented. Work supported by the U.S. Department of Energy, Office of Science, Office of Fusion Energy Sciences, using User Facility DIII-D, under Award Number DE-FC02-04ER54698 and by MIT PSFC cooperative agreement DE-SC0014264.

  17. 75 FR 55786 - Office of Special Education Programs, Office of Special Education and Rehabilitative Services...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-14

    ... DEPARTMENT OF EDUCATION Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of Education; Notice of Final Extension of Project Period and Waiver for the... Transition Technical Assistance Center (NSTTAC). Currently, the Office of Special Education Programs (OSEP...

  18. [Psychiatric patients and relatives instruct German police officers - an anti-stigma project of "BASTA - the alliance for mentally ill people"].

    PubMed

    Wundsam, Kerstin; Pitschel-Walz, Gabi; Leucht, Stefan; Kissling, Werner

    2007-05-01

    Contact with police officers due to schizophrenia and resort to violence in such interactions is a common occurrence and represents a source for stigmatisation of mentally ill people. Aim of this project was to establish a program for police officers to reduce that stigma. The seminar was developed by a German anti-stigma organisation in cooperation with sociology teachers of the Bavarian police academy. Evaluations focussed on the police officers "social distance" and "negative stereotypes" towards mentally ill people. The personal contact between officers and the referees (patients, relatives, professionals) was the core of the seminar. Results of a debriefing after the pilot-project was overall positive. Evaluations in the renewal years showed significant improvement within the scale "social distance" (p < 0.0001) and amelioration in the stereotype-categories "violence" and "treatability". The need for special training of the police regarding mental illnesses was acknowledged by all participants. Personal contact of police officers with patients and relatives appeared to be important for the efficacy of this seminar and should become a main focus in similar anti-stigma interventions.

  19. Corrosion-Resistant Materials for Water and Wastewater Treatment Plants at Fort Bragg

    DTIC Science & Technology

    2007-06-01

    degradation, and assist in evaluating the Return on Investment for the project. The Project Manager was Dr. Ashok Kumar. The Associate Project Man- ager...Fort Bragg DPW Office), Steve Jackson (Instal- lation Management Agency – South East Region Office), Paul Volkman (Headquarters-Installation... Management Command), David Purcell, (Headquarters, Assistant Chief of Staff for Installation Management ), and Hilton Mills (Army Materiel Command), as

  20. The Inventive Thinking Curriculum Project. An Outreach Program of the United States Patent and Trademark Office. Third Edition.

    ERIC Educational Resources Information Center

    Department of Commerce, Washington, DC.

    The Inventive Thinking Curriculum Project is one of the many projects included in the national outreach program of the U.S. Patent and Trademark Office. It is designed to be used in conjunction with a thinking skills program as a means of applying critical and creative thinking and problem-solving skills through the activity of creating an…

  1. 78 FR 65695 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...

  2. 5 CFR 890.1301 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... project will run for a period of three years. The legislation requires the Office of Personnel Management... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL... Demonstration Project § 890.1301 Purpose. The purpose of this subpart is to implement section 721 of the...

  3. 34 CFR 643.4 - What services may a project provide?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... involving elementary or secondary school teachers, faculty members at institutions of higher education....4 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION TALENT SEARCH General § 643.4 What services may a project...

  4. 18 CFR 153.8 - Required exhibits.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Office of Energy Projects, 888 First Street, NE., Washington, DC 20426; (6) Exhibit E-1. If the LNG... Technical Information Service or the Commission's Office of Energy Projects, 888 First Street, NE....8 Section 153.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  5. 18 CFR 153.8 - Required exhibits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Office of Energy Projects, 888 First Street, NE., Washington, DC 20426; (6) Exhibit E-1. If the LNG... Technical Information Service or the Commission's Office of Energy Projects, 888 First Street, NE....8 Section 153.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  6. 18 CFR 153.8 - Required exhibits.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Office of Energy Projects, 888 First Street, NE., Washington, DC 20426; (6) Exhibit E-1. If the LNG... Technical Information Service or the Commission's Office of Energy Projects, 888 First Street, NE....8 Section 153.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  7. 18 CFR 153.8 - Required exhibits.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Office of Energy Projects, 888 First Street, NE., Washington, DC 20426; (6) Exhibit E-1. If the LNG... Technical Information Service or the Commission's Office of Energy Projects, 888 First Street, NE....8 Section 153.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  8. 18 CFR 153.8 - Required exhibits.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Office of Energy Projects, 888 First Street, NE., Washington, DC 20426; (6) Exhibit E-1. If the LNG... Technical Information Service or the Commission's Office of Energy Projects, 888 First Street, NE....8 Section 153.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  9. 44. Photographic copy of original construction drawing, dated August 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photographic copy of original construction drawing, dated August 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). PLANS AND SECTIONS OF VAULTS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  10. 24 CFR 401.480 - Sale or transfer of project.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND HOUSING ASSISTANCE RESTRUCTURING PROGRAM (MARK-TO-MARKET) Restructuring Plan § 401.480 Sale or transfer of project. (a) May the owner...

  11. Support to 2nd Generation RLV Propulsion Project Office

    NASA Technical Reports Server (NTRS)

    Lee, Thomas J.

    2002-01-01

    In this final report regarding support to the second generation RLV (Reusable Launch Vehicle) propulsion project office, a list of tasks accomplished is presented. During this period, Lee & Associates, LLC participated in numerous Systems Requirements Reviews (SRR) related to the Cobra development program.

  12. Cultural Resources Survey Without Testing, of the Nonconnah Creek Project, Shelby County, Tennessee. A Negative Finding Report

    DTIC Science & Technology

    1987-01-01

    southern part of Shelby County, Tennessee (Figure 1-1). The project extends from the mouth of the creek at Lake McKellar upstream for a distance of 18.2 mi...project consists of two distinct improvement plans, each requiring a different ROW. From the mouth of the creek at Lake McKellar upstream to the confluence...in fact, consisted of a set of pier or wharf pilingssituated along the north bank of the creek at its junction with Lake McKellar(Figures 5-2 and 5-3

  13. Controlled finite momentum pairing and spatially varying order parameter in proximitized HgTe quantum wells

    NASA Astrophysics Data System (ADS)

    Hart, Sean; Ren, Hechen; Kosowsky, Michael; Ben-Shach, Gilad; Leubner, Philipp; Bruene, Christoph; Buhmann, Hartmut; Molenkamp, Laurens; Halperin, Bertrand; Yacoby, Amir

    Conventional s-wave superconductivity arises from singlet pairing of electrons with opposite Fermi momenta, forming Cooper pairs with zero net momentum. Recent studies have focused on coupling s-wave superconductors to systems with an unusual configuration of electronic spin and momentum at the Fermi surface, where the nature of the paired state can be modified and the system may even undergo a topological phase transition. Here we present measurements on Josephson junctions based on HgTe quantum wells coupled to aluminum or niobium superconductors, and subject to a magnetic field in the plane of the quantum well. We observe that the in-plane magnetic field modulates the Fraunhofer interference pattern, and that this modulation depends both on electron density and on the direction of the in-plane field with respect to the junction. However, the orientation of the junction with respect to the underlying crystal lattice does not impact the measurements. These findings suggest that spin-orbit coupling plays a role in the observed behavior, and that measurements of Josephson junctions in the presence of an in-plane field can elucidate the Fermi surface properties of the weak link material. NSF DMR-1206016; STC Center for Integrated Quantum Materials under NSF Grant No. DMR-1231319; NSF GRFP under Grant DGE1144152, Microsoft Corporation Project Q.

  14. Induced Superconductivity in the Quantum Spin Hall Edge

    NASA Astrophysics Data System (ADS)

    Ren, Hechen; Hart, Sean; Wagner, Timo; Leubner, Philipp; Muehlbauer, Mathias; Bruene, Christoph; Buhmann, Hartmut; Molenkamp, Laurens; Yacoby, Amir

    2014-03-01

    Two-dimensional topological insulators have a gapped bulk and helical edge states, making it a quantum spin Hall insulator. Combining such edge states with superconductivity can be an excellent platform for observing and manipulating localized Majorana fermions. In the context of condensed matter, these are emergent electronic states that obey non-Abelian statistics and hence support fault-tolerant quantum computing. To realize such theoretical constructions, an essential step is to show these edge channels are capable of carrying coherent supercurrent. In our experiment, we fabricate Josephson junctions with HgTe/HgCdTe quantum wells, a two-dimensional material that becomes a quantum spin Hall insulator when the quantum well is thicker than 6.3 nm and the bulk density is depleted. In this regime, we observe supercurrents whose densities are confined to the edges of the junctions, with edge widths ranging from 180 nm to 408 nm. To verify the topological nature of these edges, we measure identical junctions with HgTe/HgCdTe quantum wells thinner than 6.3 nm and observe only uniform supercurrent density across the junctions. This research is supported by Microsoft Corporation Project Q, the NSF DMR-1206016, the DOE SCGF Program, the German Research Foundation, and EU ERC-AG program.

  15. Publications - STATEMAP Project | Alaska Division of Geological &

    Science.gov Websites

    ., 2008, Surficial-geologic map of the Salcha River-Pogo area, Big Delta Quadrangle, Alaska: Alaska , Engineering - geologic map, Alaska Highway corridor, Delta Junction to Dot Lake, Alaska: Alaska Division of geologic map of the Salcha River-Pogo area, Big Delta Quadrangle, Alaska: Alaska Division of Geological

  16. Hyperspectral Technology Transfer to the US Department of Interior: Summary of Results of the NASA/DOI Hyperspectral Technology Transfer Project

    NASA Technical Reports Server (NTRS)

    Root, Ralph; Wickland, Diane

    2001-01-01

    In 1997 the Office of Biological Informatics and Outreach (OBIO), Biological Resources Division, US Geological Survey and NASA, Office of Earth Science (OES), initiated a coordinated effort for applying Airborne Visible and Infrared Imaging Spectrometer (AVIRIS) data and analysis, as a technology transfer project, to critical DOI environmental issues in four study sites throughout the United States. This work was accomplished by four US Department of the Interior (DOI) study teams with support from NASA/OES principal investigators and the Office of Earth Science programs. The studies, including personnel, objectives, background, project plans, and milestones were documented in a project website at . This report summarizes the final outcomes of the project, detailing accomplishments, lessons learned, and benefits realized to NASA, the US Geological Survey, and the participating DOI bureaus.

  17. 34 CFR 645.11 - What services do all Upward Bound projects provide?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... programs involving elementary or secondary school teachers, faculty members at institutions of higher....11 Section 645.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION UPWARD BOUND PROGRAM What Kinds of Projects...

  18. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  19. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  20. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  1. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  2. Analysis of Florida Department Of Transportation Transit Corridor Program/Projects: Technical Memorandum Number Three - General Recommendations

    DOT National Transportation Integrated Search

    2001-03-01

    CUTR interviewed FDOT personnel at both the Central Office and Distict Offices and agency personnel to discuss the strengths and weaknesses of the overall Transit Corridor Program, including the results of specific projects, as well as the FDOT proce...

  3. 34 CFR 369.1 - What are the Vocational Rehabilitation Service Projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What are the Vocational Rehabilitation Service Projects? 369.1 Section 369.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VOCATIONAL...

  4. 34 CFR 272.10 - What types of projects may be funded?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., counselors, parents, community members, and other elementary or secondary school personnel to deal... 272.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary may award funds to DACs for projects offering technical assistance (including training) to school...

  5. 34 CFR 272.10 - What types of projects may be funded?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., counselors, parents, community members, and other elementary or secondary school personnel to deal... 272.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary may award funds to DACs for projects offering technical assistance (including training) to school...

  6. 34 CFR 271.10 - What types of projects may be funded?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... members, and other elementary or secondary school personnel to deal effectively with special educational... 271.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary awards grants to SEAs for projects offering technical assistance (including training) to school...

  7. 34 CFR 271.10 - What types of projects may be funded?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... members, and other elementary or secondary school personnel to deal effectively with special educational... 271.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary awards grants to SEAs for projects offering technical assistance (including training) to school...

  8. 34 CFR 637.13 - What are design projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are design projects? 637.13 Section 637.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  9. 34 CFR 637.13 - What are design projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are design projects? 637.13 Section 637.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  10. 34 CFR 637.12 - What are institutional projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are institutional projects? 637.12 Section 637.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  11. 34 CFR 637.15 - What are cooperative projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are cooperative projects? 637.15 Section 637.15 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  12. 34 CFR 637.13 - What are design projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are design projects? 637.13 Section 637.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  13. 34 CFR 637.12 - What are institutional projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are institutional projects? 637.12 Section 637.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  14. 34 CFR 637.12 - What are institutional projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are institutional projects? 637.12 Section 637.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  15. 34 CFR 637.15 - What are cooperative projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are cooperative projects? 637.15 Section 637.15 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  16. 34 CFR 637.15 - What are cooperative projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are cooperative projects? 637.15 Section 637.15 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  17. 34 CFR 637.15 - What are cooperative projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are cooperative projects? 637.15 Section 637.15 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  18. 34 CFR 637.12 - What are institutional projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are institutional projects? 637.12 Section 637.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  19. 34 CFR 637.13 - What are design projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are design projects? 637.13 Section 637.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  20. 34 CFR 637.15 - What are cooperative projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are cooperative projects? 637.15 Section 637.15 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  1. 34 CFR 637.13 - What are design projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are design projects? 637.13 Section 637.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  2. 24 CFR 570.410 - Special Projects Program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND... sent to: Department of Housing and Urban Development, Office of Community Planning and Development, 451... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Special Projects Program. 570.410...

  3. 76 FR 72929 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ... proposed information collection project: ``Medical Office Survey on Patient Safety Culture Comparative... Medical Office Survey on Patient Safety Culture Comparative Database. The Agency for Healthcare Research... Patient Safety Culture (Medical Office SOPS) Comparative Database. The Medical Office SOPS Comparative...

  4. 77 FR 3787 - Notice of Submission of Proposed Information Collection to OMB; Office of Hospital Facilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ...The proposed information collection requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. This information is collected from OHF staff, mortgagees, mortgagors, contractors and agents to manage and monitor the application, procedure, project administration and initial/final endorsement of projects undertaken by Office of Hospital Facilities.

  5. 17. Photocopy of original USRS photograph (from original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of original USRS photograph (from original print in the Umatilla Project History 1920, on file at National Archives, Rocky Mountain Region, Denver, Colorado) Photographer unknown, ca. 1920. Project office and employees - reading from left to right: Una H. Keck, Geo. C. Patterson, H.M. Schilling, Maurice D. Scroggs, Carl M. Voyen, Chas. Taylor, C.D. Porter - Former Umatilla Project Headquarters Buildings, Office, Hermiston, Umatilla County, OR

  6. Toward an expert project management system

    NASA Technical Reports Server (NTRS)

    Silverman, Barry G.; Murray, Arthur; Diakite, Coty; Feggos, Kostas

    1987-01-01

    The purpose of the research effort is to prescribe a generic reusable shell that any project office can install and customize for the purposes of advising, guiding, and supporting project managers in that office. The prescribed shell is intended to provide both: a component that generates prescriptive guidance for project planning and monitoring activities, and an analogy (intuition) component that generates descriptive insights of previous experience of successful project managers. The latter component is especially significant in that it has the potential to: retrieve insights, not just data, and provide a vehicle for expert PMs to easily transcribe their current experiences in the course of each new project managed.

  7. 34 CFR 390.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false What types of projects are authorized under this program? 390.10 Section 390.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION REHABILITATION...

  8. 34 CFR 390.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false What types of projects are authorized under this program? 390.10 Section 390.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION REHABILITATION...

  9. 34 CFR 390.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What types of projects are authorized under this program? 390.10 Section 390.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION REHABILITATION...

  10. 34 CFR 645.1 - What is the Upward Bound Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... participants the skills and motivation necessary to complete a program of secondary education and to enter and... the following three types of projects: (1) Regular Upward Bound projects. (2) Upward Bound Math and... Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY...

  11. 34 CFR 647.5 - How long is a project period?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false How long is a project period? 647.5 Section 647.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION RONALD E. MCNAIR POSTBACCALAUREATE ACHIEVEMENT PROGRAM General § 647.5...

  12. 78 FR 57623 - TRICARE Over-the-Counter Drug Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Over-the-Counter Drug Demonstration Project AGENCY: Office of the Secretary, DoD. ACTION: Notice of modification to the TRICARE Over-the-Counter Drug...) drugs to be included on the TRICARE uniform formulary. The Department has been engaged in a...

  13. 34 CFR 366.60 - What are the project evaluation standards?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What are the project evaluation standards? 366.60 Section 366.60 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION CENTERS FOR INDEPENDENT LIVING...

  14. 34 CFR 366.60 - What are the project evaluation standards?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What are the project evaluation standards? 366.60 Section 366.60 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION CENTERS FOR INDEPENDENT LIVING...

  15. 34 CFR 643.4 - What services does a project provide?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... institutions of higher education, students, or any combination of these persons. (7) Programs and activities as....4 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION TALENT SEARCH General § 643.4 What services does a project...

  16. 78 FR 32406 - Submission for OMB Review; 30-Day Comment Request: Women's Health Initiative Observational Study

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ...; 30-Day Comment Request: Women's Health Initiative Observational Study SUMMARY: Under the provisions... proposed project contact: Shari Eason Ludlam, Project Officer, Women's Health Initiative Program Office... additional plans and instruments must be requested in writing. Proposed Collection: Women's Health Initiative...

  17. 34 CFR 379.44 - What are the requirements for a continuation award?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY...: (1) Congress must appropriate sufficient funds under the program. (2) Continuation of the project must be in the best interest of the Federal Government. (Approved by the Office of Management and...

  18. 43. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). NORTH ELEVATION (NORTH SIDE) AND WEST ELEVATION (WEST SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  19. 42. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). EAST ELEVATION (EAST SIDE) AND SOUTH ELEVATION (SOUTH SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  20. 75 FR 32494 - Energy Conservation for PHA-Owned or Leased Project-Audits, Utility Allowances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ...-Owned or Leased Project-Audits, Utility Allowances AGENCY: Office of the Chief Information Officer, HUD... complete energy audits, benefit/cost analyses for individual vs. master metering. PHAs review tenant...-Audits, Utility Allowances. OMB Approval Number: 2577-0062. Form Numbers: HUD-50078. Description of the...

  1. 76 FR 53682 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ... approval from the Office of Management and Budget (OMB) for a generic clearance that will allow OPRE to... the following: Office of Management and Budget, Paperwork Reduction Project, Fax: 202-395- 6974, Attn... a variety of new research projects in the fields of cash welfare, employment and self-sufficiency...

  2. OCLC Office of Research Scholarly Service.

    ERIC Educational Resources Information Center

    Crook, Mark A.

    This report briefly describes the background, software, tools used, and future directions of the Scholarly Services project which began in 1987 in the OCLC Office of Research. Several selected projects are reviewed to illustrate how sample data are extracted from the OCLC Online Union Catalog to support scholars in their research endeavors. The…

  3. Flat-plate solar array project. Volume 5: Process development

    NASA Technical Reports Server (NTRS)

    Gallagher, B.; Alexander, P.; Burger, D.

    1986-01-01

    The goal of the Process Development Area, as part of the Flat-Plate Solar Array (FSA) Project, was to develop and demonstrate solar cell fabrication and module assembly process technologies required to meet the cost, lifetime, production capacity, and performance goals of the FSA Project. R&D efforts expended by Government, Industry, and Universities in developing processes capable of meeting the projects goals during volume production conditions are summarized. The cost goals allocated for processing were demonstrated by small volume quantities that were extrapolated by cost analysis to large volume production. To provide proper focus and coverage of the process development effort, four separate technology sections are discussed: surface preparation, junction formation, metallization, and module assembly.

  4. Support of US CLIVAR Project Office 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cummings, Donna

    Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and developmentmore » of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals« less

  5. EHS and FME Lend Their Expertise to NCI Campus Refurbishment Project | Poster

    Cancer.gov

    In October 2015, the NCI executive officer and the director of NCI’s Office of Space and Facilities Management (OSFM) announced a wide-ranging refurbishment plan for NCI at Frederick. Since then, a project team comprising members from the Office of Scientific Operations, the Management Operations Support Branch, OSFM, the Center for Cancer Research, the Environment, Health, and Safety (EHS) directorate, and the Facilities Maintenance and Engineering (FME) directorate have met regularly with the laboratory groups affected by the refurbishment plan. Read more...

  6. Use Management Techniques in Office Practice

    ERIC Educational Resources Information Center

    Holehan, E. Lee

    1977-01-01

    Notes that authenticity can be added to student work projects in an office practice class by having the teacher assume the role of the office manager or supervisor and putting office management techniques into practice. Ways in which such techniques may be infused into classes are examined. (TA)

  7. LICENSING HYDROPOWER PROJECTS: Better Time and Cost Data Needed to Reach Informed Decisions About Process Reforms

    DTIC Science & Technology

    2001-05-01

    GAO United States General Accounting Office Report to Congressional Requesters May 2001 LICENSING HYDROPOWER PROJECTS Better Time and Cost Data...Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle LICENSING HYDROPOWER PROJECTS: Better Time and Cost Data Needed to Reach Informed...Organization Name(s) and Address(es) General Accounting Office, PO Box 37050, Washington, DC 20013 Performing Organization Number(s) GAO-01-499

  8. Geophysical background and as-built target characteristics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, J.W.

    1994-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) has provided a facility for DOE, other Government agencies, and the private sector to evaluate and document the utility of specific geophysical measurement techniques for detecting and defining cultural and environmental targets. This facility is the Rabbit Valley Geophysics Performance Evaluation Range (GPER). Geophysical surveys prior to the fiscal year (FY) 1994 construction of new test cells showed the primary test area to be relatively homogeneous and free from natural or man-made artifacts, which would generate spurious responses in performance evaluation data. Construction of nine new cell areas inmore » Rabbit Valley was completed in June 1994 and resulted in the emplacement of approximately 150 discrete targets selected for their physical and electrical properties. These targets and their geophysical environment provide a broad range of performance evaluation parameters from ``very easy to detect`` to ``challenging to the most advanced systems.`` Use of nonintrusive investigative techniques represents a significant improvement over intrusive characterization methods, such as drilling or excavation, because there is no danger of exposing personnel to possible hazardous materials and no risk of releasing or spreading contamination through the characterization activity. Nonintrusive geophysical techniques provide the ability to infer near-surface structure and waste characteristics from measurements of physical properties associated with those targets.« less

  9. 78 FR 22604 - Privacy Act of 1974, as Amended; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ...: Chief-Office of Strategic Systems Management, Chief-Office of Quality, Chief-Office of Order Management & Delivery Systems, and Chief-Office of Portfolio & Project Management. Bureau of Engraving and Printing...; System of Records AGENCY: Bureau of Engraving and Printing, Treasury. ACTION: Notice of systems of...

  10. 78 FR 16502 - Proposed Agency Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ...: Board of Governors of the Federal Reserve System. SUMMARY: On June 15, 1984, the Office of Management... OMB Desk Officer, Shagufta Ahmed, Office of Information and Regulatory Affairs, Office of Management... Collection Report title: Annual Company-Run Stress Test Projections. Agency form number: FR Y-16. OMB control...

  11. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  12. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  13. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  14. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  15. 77 FR 65395 - Notice of Submission of Proposed Information Collection to OMB: Section 8 Contract Renewal Policy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... Project- Based Section 8 Contracts AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice... through the use of appropriate automated collection techniques or other forms of information technology, e... Section 8 project-based assistance contracts are renewed. The Section 8 contract renewal process is an...

  16. 34 CFR 390.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What types of projects are authorized under this program? 390.10 Section 390.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION REHABILITATION SHORT...

  17. 34 CFR 390.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true What types of projects are authorized under this program? 390.10 Section 390.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION REHABILITATION SHORT...

  18. 34 CFR 472.34 - Under what circumstances may a project continue if a partner withdraws?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Under what circumstances may a project continue if a partner withdraws? 472.34 Section 472.34 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION NATIONAL WORKPLACE...

  19. 77 FR 65203 - Information Collection Request Sent to the Office of Management and Budget (OMB) for Approval...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ...-FF09E30000] Information Collection Request Sent to the Office of Management and Budget (OMB) for Approval; Wolf-Livestock Demonstration Project Grant Program AGENCY: Fish and Wildlife Service, Interior. ACTION... Number: 1018-XXXX. This is a new collection. Title: Wolf-Livestock Demonstration Project Grant Program...

  20. 24 CFR 990.280 - Project-based budgeting and accounting.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... company to manage a project, the PHA may use the difference between the property management fee paid to the private management company and the fee that is reasonable to fund operations of the central office... reasonable asset management fee that may also be used to fund operations of the central office. However, this...

  1. 18 CFR 5.14 - Formal study dispute resolution process.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... dispute, the panel shall make and deliver to the Director of the Office of Energy Projects a finding, with... from the date of filing of the notice of study dispute, the Director of the Office of Energy Projects... resolution process. 5.14 Section 5.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...

  2. 18 CFR 5.14 - Formal study dispute resolution process.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... dispute, the panel shall make and deliver to the Director of the Office of Energy Projects a finding, with... from the date of filing of the notice of study dispute, the Director of the Office of Energy Projects... resolution process. 5.14 Section 5.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...

  3. 18 CFR 5.14 - Formal study dispute resolution process.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... dispute, the panel shall make and deliver to the Director of the Office of Energy Projects a finding, with... from the date of filing of the notice of study dispute, the Director of the Office of Energy Projects... resolution process. 5.14 Section 5.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...

  4. Concentrating Solar Power Projects - ISCC Ain Beni Mathar | Concentrating

    Science.gov Websites

    Location: Ain Beni Mathar (Ain Beni Mathar) Owner(s): ONE (Office National de l'Electricite) (100 Project Type: Commercial Participants Developer(s): Abener Owner(s) (%): ONE (Office National de l'Electricite) (100%) EPC Contractor: Abener Operator(s): Abengoa Solar / ONE Generation Offtaker(s): ONE

  5. 34 CFR 206.3 - Who is eligible to participate in a project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Who is eligible to participate in a project? 206.3 Section 206.3 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND SECONDARY EDUCATION, DEPARTMENT OF EDUCATION SPECIAL EDUCATIONAL PROGRAMS FOR STUDENTS WHOSE FAMILIES ARE...

  6. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What selection criteria does the Secretary use for the Demonstration Projects? 426.21 Section 426.21 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION COOPERATIVE...

  7. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What selection criteria does the Secretary use for the Demonstration Projects? 426.21 Section 426.21 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION COOPERATIVE...

  8. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What selection criteria does the Secretary use for the Demonstration Projects? 426.21 Section 426.21 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION COOPERATIVE...

  9. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What selection criteria does the Secretary use for the Demonstration Projects? 426.21 Section 426.21 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION COOPERATIVE...

  10. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What selection criteria does the Secretary use for the Demonstration Projects? 426.21 Section 426.21 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION COOPERATIVE...

  11. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  12. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  13. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  14. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What kinds of projects are supported by this program? 637.11 Section 637.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  15. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  16. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What kinds of projects are supported by this program? 637.11 Section 637.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  17. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  18. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What kinds of projects are supported by this program? 637.11 Section 637.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  19. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What kinds of projects are supported by this program? 637.11 Section 637.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  20. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What kinds of projects are supported by this program? 637.11 Section 637.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  1. 34 CFR 350.1 - What is the Disability and Rehabilitation Research Projects and Centers Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the Disability and Rehabilitation Research Projects and Centers Program? 350.1 Section 350.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION...

  2. 34 CFR 200.86 - Use of MEP funds in schoolwide projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 1 2012-07-01 2012-07-01 false Use of MEP funds in schoolwide projects. 200.86 Section 200.86 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND SECONDARY EDUCATION, DEPARTMENT OF EDUCATION TITLE I-IMPROVING THE ACADEMIC ACHIEVEMENT OF THE DISADVANTAGED...

  3. 34 CFR 403.61 - What projects, services, and activities are permissible under the basic programs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What projects, services, and activities are permissible under the basic programs? 403.61 Section 403.61 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE...

  4. 34 CFR 403.61 - What projects, services, and activities are permissible under the basic programs?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What projects, services, and activities are permissible under the basic programs? 403.61 Section 403.61 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE...

  5. 34 CFR 403.61 - What projects, services, and activities are permissible under the basic programs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What projects, services, and activities are permissible under the basic programs? 403.61 Section 403.61 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE...

  6. 34 CFR 403.61 - What projects, services, and activities are permissible under the basic programs?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What projects, services, and activities are permissible under the basic programs? 403.61 Section 403.61 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE...

  7. 34 CFR 403.61 - What projects, services, and activities are permissible under the basic programs?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What projects, services, and activities are permissible under the basic programs? 403.61 Section 403.61 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE...

  8. Mesa County Public Library District, Final Performance Report for Library Services and Construction Act (LSCA) Title VI, Library Literacy Program.

    ERIC Educational Resources Information Center

    LaDuke, Caryl

    The Adult Reading Program, a project of the Mesa County Public Library District (Grand Junction, Colorado), involved recruitment, retention, coalition building, public awareness, training, rural oriented, basic literacy, collection development, tutoring, employment oriented, intergenerational/family, and English as a Second Language (ESL)…

  9. Annual Report 2008 -- Office of the Chief Financial Officer (OCFO)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fernandez, Jeffrey

    2008-12-22

    It is with great pleasure that I present to you the 2008 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office. Also included are some financial comparisons with other DOE Laboratories and a glossary of commonly used acronyms.

  10. User's operating procedures. Volume 2: Scout project financial analysis program

    NASA Technical Reports Server (NTRS)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  11. Automated 3D quantitative assessment and measurement of alpha angles from the femoral head-neck junction using MR imaging

    NASA Astrophysics Data System (ADS)

    Xia, Ying; Fripp, Jurgen; Chandra, Shekhar S.; Walker, Duncan; Crozier, Stuart; Engstrom, Craig

    2015-10-01

    To develop an automated approach for 3D quantitative assessment and measurement of alpha angles from the femoral head-neck (FHN) junction using bone models derived from magnetic resonance (MR) images of the hip joint. Bilateral MR images of the hip joints were acquired from 30 male volunteers (healthy active individuals and high-performance athletes, aged 18-49 years) using a water-excited 3D dual echo steady state (DESS) sequence. In a subset of these subjects (18 water-polo players), additional True Fast Imaging with Steady-state Precession (TrueFISP) images were acquired from the right hip joint. For both MR image sets, an active shape model based algorithm was used to generate automated 3D bone reconstructions of the proximal femur. Subsequently, a local coordinate system of the femur was constructed to compute a 2D shape map to project femoral head sphericity for calculation of alpha angles around the FHN junction. To evaluate automated alpha angle measures, manual analyses were performed on anterosuperior and anterior radial MR slices from the FHN junction that were automatically reformatted using the constructed coordinate system. High intra- and inter-rater reliability (intra-class correlation coefficients  >  0.95) was found for manual alpha angle measurements from the auto-extracted anterosuperior and anterior radial slices. Strong correlations were observed between manual and automatic measures of alpha angles for anterosuperior (r  =  0.84) and anterior (r  =  0.92) FHN positions. For matched DESS and TrueFISP images, there were no significant differences between automated alpha angle measures obtained from the upper anterior quadrant of the FHN junction (two-way repeated measures ANOVA, F  <  0.01, p  =  0.98). Our automatic 3D method analysed MR images of the hip joints to generate alpha angle measures around the FHN junction circumference with very good reliability and reproducibility. This work has the potential to improve analyses of cam-type lesions of the FHN junction for large-scale morphometric and clinical MR investigations of the human hip region.

  12. The National Library of Medicine's Native American outreach portfolio: a descriptive overview*

    PubMed Central

    Wood, Frederick B.; Siegel, Elliot R.; Dutcher, Gale A.; Ruffin, Angela; Logan, Robert A.; Scott, John C.

    2005-01-01

    Objectives: This paper provides the most complete accounting of the National Library of Medicine's (NLM's) Native outreach since 1995, when there were only a few scattered projects. Method: The descriptive overview is based on a review of project reports, inventories, and databases and input from the NLM Specialized Information Services Division, National Network Office of the Library Operations Division, National Network of Libraries of Medicine, and Office of Health Information Programs Development of the Office of the NLM Director. The overview focuses on NLM-supported or sponsored outreach initiatives involving Native peoples: American Indians, Alaska Natives, and Native Hawaiians. Results: The review of NLM's relevant activities resulted in a portfolio of projects that clustered naturally into the following areas: major multisite projects: Tribal Connections and related, Native American Information Internship Project: Sacred Root, tribal college outreach and tribal librarianship projects, collaboration with inter-tribal and national organizations, participation in Native American Powwows, Native American Listening Circle Project, Native American Health Information, and other Native American outreach projects. Implications: NLM's Native American Outreach reached programmatic status as of late 2004. The companion paper identifies several areas of possible new or enhanced Native outreach activities. Both papers highlight the importance of solid reporting and evaluation to optimize project results and programmatic balance and priorities. PMID:16239955

  13. The National Library of Medicine's Native American outreach portfolio: a descriptive overview.

    PubMed

    Wood, Frederick B; Siegel, Elliot R; Dutcher, Gale A; Ruffin, Angela; Logan, Robert A; Scott, John C

    2005-10-01

    This paper provides the most complete accounting of the National Library of Medicine's (NLM's) Native outreach since 1995, when there were only a few scattered projects. The descriptive overview is based on a review of project reports, inventories, and databases and input from the NLM Specialized Information Services Division, National Network Office of the Library Operations Division, National Network of Libraries of Medicine, and Office of Health Information Programs Development of the Office of the NLM Director. The overview focuses on NLM-supported or sponsored outreach initiatives involving Native peoples: American Indians, Alaska Natives, and Native Hawaiians. The review of NLM's relevant activities resulted in a portfolio of projects that clustered naturally into the following areas: major multisite projects: Tribal Connections and related, Native American Information Internship Project: Sacred Root, tribal college outreach and tribal librarianship projects, collaboration with inter-tribal and national organizations, participation in Native American Powwows, Native American Listening Circle Project, Native American Health Information, and other Native American outreach projects. NLM's Native American Outreach reached programmatic status as of late 2004. The companion paper identifies several areas of possible new or enhanced Native outreach activities. Both papers highlight the importance of solid reporting and evaluation to optimize project results and programmatic balance and priorities.

  14. Comparison of online and offline tests in LED accelerated reliability tests under temperature stress.

    PubMed

    Ke, Hong-Liang; Jing, Lei; Gao, Qun; Wang, Yao; Hao, Jian; Sun, Qiang; Xu, Zhi-Jun

    2015-11-20

    Accelerated aging tests are the main method used in the evaluation of LED reliability, and can be performed in either online or offline modes. The goal of this study is to provide the difference between the two test modes. In the experiments, the sample is attached to different heat sinks to acquire the optical parameters under different junction temperatures of LEDs. By measuring the junction temperature in the aging process (Tj1), and the junction temperature in the testing process (Tj2), we achieve consistency with an online test of Tj1 and Tj2 and a difference with an offline test of Tj1 and Tj2. Experimental results show that the degradation rate of the luminous flux rises as Tj2 increases, which yields a difference of projected life L(70%) of 8% to 13%. For color shifts over 5000 h of aging, the online test shows a larger variation of the distance from the Planckian locus, about 40% to 50% more than the normal test at an ambient temperature of 25°C.

  15. The gatemon: a transmon with a voltage-variable superconductor-semiconductor junction

    NASA Astrophysics Data System (ADS)

    Petersson, Karl

    We have developed a superconducting transmon qubit with a semiconductor-based Josephson junction element. The junction is made from an InAs nanowire with in situ molecular beam epitaxy-grown superconducting Al contacts. This gate-controlled transmon, or gatemon, allows simple tuning of the qubit transition frequency using a gate voltage to vary the density of carriers in the semiconductor region. In the first generations of devices we have measured coherence times up to ~10 μs. These coherence times, combined with stable qubit operation, permit single qubit rotations with fidelities of ~99.5 % for all gates including voltage-controlled Z rotations. Towards multi-qubit operation we have also implemented a two qubit voltage-controlled cPhase gate. In contrast to flux-tuned transmons, voltage-tunable gatemons may simplify the task of scaling to multi-qubit circuits and enable new means of control for many qubit architectures. In collaboration with T.W. Larsen, L. Casparis, M.S. Olsen, F. Kuemmeth, T.S. Jespersen, P. Krogstrup, J. Nygard and C.M. Marcus. Research was supported by Microsoft Project Q, Danish National Research Foundation and a Marie Curie Fellowship.

  16. Tunneling anisotropic magnetoresistance in complex oxide tunnel junctions

    NASA Astrophysics Data System (ADS)

    Martínez, Benjamín; López-Mir, Laura; Galceran, Regina; Balcells, Lluis; Pomar, Alberto; Konstantinovic, Zorica; Sandiumenge, Felip; Frontera, Carlos; Advanced Characterization of Nanostructured Materials Team

    The magnetotransport properties of La2/3Sr1/3MnO3(LSMO)/LaAlO3(LAO)/ Pt tunneling junctions have been analyzed as a function of temperature and magnetic field. The junctions exhibit magnetoresistance (MR) values of about 37%, at H = 90 kOe at low temperature. However, the temperature dependence of MR indicates a clear distinct origin than that of conventional colossal MR. In addition, tunneling anisotropic MR (TAMR) values around 4% are found at low temperature and its angular dependence reflects the expected uniaxial anisotropy. The use of TAMR response could be an alternative of much easier technological implementation than conventional MTJs since only one magnetic electrode is required, thus opening the door to the implementation of more versatile devices. However, further studies are required in order to improve the strong temperature dependence at the present stage. Finantial support from Spanish Ministry of Economy and Competitiveness through the Severo Ochoa Programme for Centres of Excellence in R&D (SEV-2015-0496), and projects MAT2012-33207 and MAT2015-71664-R is acknowledged.

  17. Performance of High-Efficiency Advanced Triple-Junction Solar Panels for the LILT Mission Dawn

    NASA Technical Reports Server (NTRS)

    Fatemi, Navid S.; Sharma, Surya; Buitrago, Oscar; Sharps, Paul R.; Blok, Ron; Kroon, Martin; Jalink, Cees; Harris, Robin; Stella, Paul; Distefano, Sal

    2005-01-01

    NASA's Discovery Mission Dawn is designed to (LILT) conditions. operate within the solar system's Asteroid belt, where the large distance from the sun creates a low-intensity, low-temperature (LILT) condition. To meet the mission power requirements under LlLT conditions, very high-efficiency multi-junction solar cells were selected to power the spacecraft to be built by Orbital Sciences Corporation (OSC) under contract with JPL. Emcore's InGaP/InGaAs/Ge advanced triple-junction (ATJ) solar cells, exhibiting an average air mass zero (AMO) efficiency of greater than 27.6% (one-sun, 28 C), were used to populate the solar panels [1]. The two solar array wings, to be built by Dutch Space, with 5 large- area panels each (total area of 36.4 sq. meters) are projected to produce between 10.3 kWe and 1.3 kWe of end-of life (EOL) power in the 1.0 to 3.0 AU range, respectively. The details of the solar panel design, testing and power analysis are presented.

  18. Role of solvent environments in single molecule conductance used insulator-modified mechanically controlled break junctions

    NASA Astrophysics Data System (ADS)

    Muthusubramanian, Nandini; Maity, Chandan; Galan Garcia, Elena; Eelkema, Rienk; Grozema, Ferdinand; van der Zant, Herre; Kavli Institute of Nanoscience Collaboration; Department of Chemical Engineering Collaboration

    We present a method for studying the effects of polar solvents on charge transport through organic/biological single molecules by developing solvent-compatible mechanically controlled break junctions of gold coated with a thin layer of aluminium oxide using plasma enhanced atomic layer deposition (ALD). The optimal oxide thickness was experimentally determined to be 15 nm deposited at ALD operating temperature of 300°C which yielded atomically sharp electrodes and reproducible single-barrier tunnelling behaviour across a wide conductance range between 1 G0 and 10-7 G0. The insulator protected MCBJ devices were found to be effective in various solvents such as deionized water, phosphate buffered saline, methanol, acetonitrile and dichlorobenzene. The yield of molecular junctions using such insulated electrodes was tested by developing a chemical protocol for synthesizing an amphipathic form of oligo-phenylene ethynylene (OPE3-PEO) with thioacetate anchoring groups. This work has further applications in studying effects of solvation, dipole orientation and other thermodynamic interactions on charge transport. Eu Marie Curie Initial Training Network (ITN). MOLECULAR-SCALE ELECTRONICS: ``MOLESCO'' Project Number 606728.

  19. Geology of the southernmost Piedmont from Columbus to Junction City, GA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanley, T.B.

    1993-03-01

    Mapping in the Piedmont from the Chattahoochee River to Junction City, GA, is critical to understanding contacts with Southern Appalachian outboard terranes, relationships to the Piedmont allochthon, strike slip displacements along major faults and late Paleozoic and post Paleozoic tectonic activity. Three major map units defining a large synform are recognized in western Muscogee County: the North Columbus Migmatite Complex, the Moffitts Mill Schist (MMS), and the Phenix City gneiss. The distinctive but poorly exposed fine grained feldspar augen MMS, which extends at least as far east as Geneva, contains small enclaves of amphibolite and calcsilicate and large enclaves ofmore » lineated granitoid gneiss. Protomylonites and mylonitic gneiss with a N-S to N45E strike are exposed from Geneva to Junction City. Three brecciated quartz dikes transect the area in eastern Muscogee Co. and Talbot Co., converging on Talbotton from the southwest. The northern dike strikes ENE and is associated with an augen schist; the middle dike strikes NE and projects to the southwest deep into Muscogee County as a silicified fracture zone with minor associated granite. The southern dike has a NNE strike and is parallel to and locally silicifies the mylonitic foliation that dominates gneisses to the east. Deflections of the magnetic anomaly patterns to the northeast in the Geneva - Junction City area are parallel to quartz dikes and mylonitic foliations.« less

  20. Programs and Projects of the Office of General Counsel (OGC)

    EPA Pesticide Factsheets

    The Office of General Counsel (OGC) attorneys work with EPA headquarters and regional offices to provide legal support for the issuance of permits, the approval of state environmental programs, and the initiation and litigation of enforcement actions.

  1. Compendium of Traffic Safety Research Projects 1985-2013.

    DOT National Transportation Integrated Search

    2014-01-01

    Through many name changes, from the Office of Program Development and Evaluation, the Office of Research and Evaluation, to the current, Office of Behavioral Safety Research, our focus has remained on improving the safety of drivers, occupants, pedes...

  2. 78 FR 64142 - 30-Day Notice of Proposed Information Collection: Condominium Project Approval Document Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... INFORMATION CONTACT: Colette Pollard, Reports Management Officer, QDAM, Department of Housing and Urban... telephone 202-402-3400. Persons with hearing or speech impairments may access this number through TTY by..., Department Reports Management Officer, Office of the Chief Information Officer. [FR Doc. 2013-25193 Filed 10...

  3. Office of Interdisciplinary Health Studies Education, East Carolina university.

    PubMed

    Greer, Annette G; Clay, Maria C

    2010-01-01

    The Office of Interdisciplinary Health Sciences Education resides organizationally within East Carolina University (ECU), Division of Health Sciences; ECU established this office in 1999. The mission of the office is fivefold: 1. promote the expansion of interdisciplinary training within and between Health Sciences and other health-related programs on campus; 2. promote innovative research opportunities across disciplines, in particular, projects regarding interdisciplinary health sciences education; 3. serve as a clearinghouse for information relative to existing and planned interdisciplinary activities and projects within the Division; 4. collaborate with units, and communities in establishing community partnerships for interdisciplinary rural health training; and 5. identify core curricular content across health-related disciplines, minimizing curricular redundancy while promoting interdisciplinary collaboration.

  4. Project Management Series Case Study: The Office of Registration and Records

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the third in a series of eight articles on project management (PM) in the academy. In this article, the authors describe the step-by-step implementation of a structural change to Indiana State University's (ISU's) Office of Registration and Records (ORR). The process described may vary as it is implemented elsewhere, but the authors…

  5. 8. Freight Warehouse, looking east into the east section. Projecting ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Freight Warehouse, looking east into the east section. Projecting into the warehouse space are: (a) A loading dock with slatted walls (b) An office space above it and (c) A toilet and utility area. (b) and (c) are accessed through the Ticket Office. - Curtis Wharf, Freight Warehouse, O & Second Streets, Anacortes, Skagit County, WA

  6. 34 CFR 403.172 - What special considerations must the State board give in approving projects, services, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What special considerations must the State board give in approving projects, services, and activities? 403.172 Section 403.172 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF...

  7. 1982 Texas Competency Validation Project for Auto Mechanics, Diesel Mechanics, Office Occupations, Printshop Trades, and Welding. Final Report.

    ERIC Educational Resources Information Center

    Rogers, Sandra K.; Dahlberg, Maurine F.

    This report documents a statewide competency validation project to provide current information about job skills considered "important to know" by Texas industrial experts in the areas of auto mechanics, diesel mechanics, office occupations, print shop trades, and welding. Section 1 describes the steps used to conduct the study and…

  8. 48 CFR 652.236-72 - Statement of Qualifications for the Omnibus Diplomatic Security and Antiterrorism Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract will require the construction of a multi-story office building, the prospective bidder/offeror..., etc.) Complexity: (office building, etc.) Type of construction: Value of project: If the prospective... (P.L. 99-399; 22 U.S.C. 4852). The Act limits certain construction projects abroad to United States...

  9. 34 CFR 426.23 - What selection criteria does the Secretary use for the Community-Based Organization Projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What selection criteria does the Secretary use for the Community-Based Organization Projects? 426.23 Section 426.23 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION...

  10. 2013 Building Technologies Office Program Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2013-11-01

    The 2013 Building Technologies Office Program Peer Review Report summarizes the results of the 2013 Building Technologies Office (BTO) peer review, which was held in Washington, D.C., on April 2–4, 2013. The review was attended by over 300 participants and included presentations on 59 BTO-funded projects: 29 from BTO’s Emerging Technologies Program, 20 from the Commercial Buildings Integration Program, 6 from the Residential Buildings Integration Program, and 4 from the Building Energy Codes Program. This report summarizes the scores and comments provided by the independent reviewers for each project.

  11. Research and technology of the Lyndon B. Johnson Space Center

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Johnson Space Center accomplishments in new and advanced concepts during 1987 are highlighted. Included are research projects funded by the Office of Aeronautics and Space Technology, Solar System Exploration and Life Sciences research funded by the Office of Space Sciences and Applications, and advanced Programs tasks funded by the Office of Space Flight. Summary sections describing the role of the Johnson Space Center in each program are followed by descriptions of significant projects. Descriptions are suitable for external consumption, free of technical jargon, and illustrated to increase ease of comprehension.

  12. Risk Management in EVA

    NASA Technical Reports Server (NTRS)

    Hall, Jonathan; Lutomski, M.

    2006-01-01

    This viewgraph presentation reviews the use of risk management in Extravehicular Activities (EVA). The contents include: 1) EVA Office at NASA - JSC; 2) EVA Project Risk Management: Why and When; 3) EVA Office Risk Management: How; 4) Criteria for Closing a Risk; 5) Criteria for Accepting a Risk; 6) ISS IRMA Reference Card Data Entry Requirement s; 7) XA/ EVA Office Risk Activity Summary; 8) EVA Significant Change Summary; 9) Integrated Risk Management Application (XA) Matrix, March 31, 2004; 10) ISS Watch Item: 50XX Summary Report; and 11) EVA Project RM Usefulness

  13. Transition Time: Zero

    NASA Technical Reports Server (NTRS)

    Cameron, W. Scott

    2004-01-01

    I had been in a technical/project management assignment about two years, when one day my boss asked me to come to his office to 'discuss an opportunity.' When I arrived in his office, he indicated that the project manager of one of our biggest ($10M+) and most important projects had requested to be removed from the job immediately, and the organization was going to grant the request. He felt I was the most experienced person he had and thought I would be a perfect fit for this job.

  14. Renovating Interior Office Space: What a Manager Needs To Consider.

    ERIC Educational Resources Information Center

    Babey, Evelyn R.

    When planning an office renovation, a manager should design an office layout that is efficient and should consider the psychological aspects of office design, including sound level, color harmony, and lighting. The manager must also have a good understanding of all phases of the project plan and the timing involved. There are basically five phases…

  15. Impact of Wet-Weather Peak Flow Blending on Disinfection and Treatment: A Case Study at Three Wastewater Treatment Plants

    EPA Science Inventory

    This research project was administered by the EPA Office of Research and Development and funded by Office of Water; Office of Policy, Economics and Innovation; and Office of Research and Development. Blending is the practice of diverting a part of peak wet-weather flows at wa...

  16. Case Studies of 19 School Resource Officer (SRO) Programs. Document Number 209271

    ERIC Educational Resources Information Center

    Finn, Peter; McDevitt, Jack; Lassiter, William; Shively, Michael; Rich, Tom

    2005-01-01

    There has been a growing interest in placing sworn law enforcement officers in schools as School Resource Officers (SROs) as a means of improving school safety and improving relations between police officers and youth. However, when this project began in May 2000, relatively little was known about SRO programs. The purpose of the National…

  17. An Introduction to ESERO-UK, the UK Space Education Office

    ERIC Educational Resources Information Center

    Clements, Allan; Mather, Edward

    2012-01-01

    This article introduces the UK branch of the European Space Education Resource Office (ESERO-UK), also known as the UK Space Education Office. It is a teaching project designed to use space to enthuse primary and secondary students to study science, technology, engineering and mathematics (STEM) subjects. The office is funded by the European Space…

  18. 43 CFR 422.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CLEO) means the highest level duly authorized law enforcement officer for a non-Department law enforcement agency. (f) Law Enforcement Officer means: (1) A duly authorized Federal law enforcement officer... LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.2 Definitions. (a) Department means...

  19. 34 CFR 472.33 - How must projects that serve adults with limited English proficiency provide for the needs of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false How must projects that serve adults with limited English proficiency provide for the needs of those adults? 472.33 Section 472.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION...

  20. 34 CFR 472.33 - How must projects that serve adults with limited English proficiency provide for the needs of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false How must projects that serve adults with limited English proficiency provide for the needs of those adults? 472.33 Section 472.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION...

  1. 34 CFR 472.33 - How must projects that serve adults with limited English proficiency provide for the needs of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false How must projects that serve adults with limited English proficiency provide for the needs of those adults? 472.33 Section 472.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION...

  2. 34 CFR 472.33 - How must projects that serve adults with limited English proficiency provide for the needs of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false How must projects that serve adults with limited English proficiency provide for the needs of those adults? 472.33 Section 472.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION...

  3. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  4. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  5. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  6. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  7. Fluidic actuators for active flow control on airframe

    NASA Astrophysics Data System (ADS)

    Schueller, M.; Weigel, P.; Lipowski, M.; Meyer, M.; Schlösser, P.; Bauer, M.

    2016-04-01

    One objective of the European Projects AFLoNext and Clean Sky 2 is to apply Active Flow Control (AFC) on the airframe in critical aerodynamic areas such as the engine/wing junction or the outer wing region for being able to locally improve the aerodynamics in certain flight conditions. At the engine/wing junction, AFC is applied to alleviate or even eliminate flow separation at low speeds and high angle of attacks likely to be associated with the integration of underwing- mounted Ultra High Bypass Ratio (UHBR) engines and the necessary slat-cut-outs. At the outer wing region, AFC can be used to allow more aggressive future wing designs with improved performance. A relevant part of the work on AFC concepts for airframe application is the development of suitable actuators. Fluidic Actuated Flow Control (FAFC) has been introduced as a Flow Control Technology that influences the boundary layer by actively blowing air through slots or holes out of the aircraft skin. FAFC actuators can be classified by their Net Mass Flux and accordingly divided into ZNMF (Zero Net Mass Flux) and NZNMF (Non Zero Net-Mass-Flux) actuators. In the frame of both projects, both types of the FAFC actuator concepts are addressed. In this paper, the objectives of AFC on the airframe is presented and the actuators that are used within the project are discussed.

  8. Analysis and evaluation in the production process and equipment area of the low-cost solar array project

    NASA Technical Reports Server (NTRS)

    Wolf, M.

    1982-01-01

    It was found that the Solarex metallization design and process selection should be modified to yield substantially higher output of the 10 cm x 10 cm cells, while the Westinghouse design is extremely close to the optimum. In addition, further attention to the Solarex pn junction and base high/low junction formation processes could be beneficial. For the future efficiency improvement, it was found that refinement of the various minority carrier lifetime measurement methods is needed, as well as considerably increased sophistication in the interpretation of the results of these methods. In addition, it was determined that further experimental investigation of the Auger lifetime is needed, to conclusively determine the Auger coefficients for the direct Auger recombination at high majority carrier concentrations.

  9. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.305 Submission of proposals for demonstration projects. (a) OPM...

  10. ZnO PN Junctions for Highly-Efficient, Low-Cost Light Emitting Diodes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David P. Norton; Stephen Pearton; Fan Ren

    2007-09-30

    By 2015, the US Department of Energy has set as a goal the development of advanced solid state lighting technologies that are more energy efficient, longer lasting, and more cost-effective than current technology. One approach that is most attractive is to utilize light-emitting diode technologies. Although III-V compound semiconductors have been the primary focus in pursuing this objective, ZnO-based materials present some distinct advantages that could yield success in meeting this objective. As with the nitrides, ZnO is a direct bandgap semiconductor whose gap energy (3.2 eV) can be tuned from 3.0 to 4 eV with substitution of Mg formore » higher bandgap, Cd for lower bandgap. ZnO has an exciton binding energy of 60 meV, which is larger than that for the nitrides, indicating that it should be a superior light emitting semiconductor. Furthermore, ZnO thin films can be deposited at temperatures on the order of 400-600 C, which is significantly lower than that for the nitrides and should lead to lower manufacturing costs. It has also been demonstrated that functional ZnO electronic devices can be fabricated on inexpensive substrates, such as glass. Therefore, for the large-area photonic application of solid state lighting, ZnO holds unique potential. A significant impediment to exploiting ZnO in light-emitting applications has been the absence of effective p-type carrier doping. However, the recent realization of acceptor-doped ZnO material overcomes this impediment, opening the door to ZnO light emitting diode development In this project, the synthesis and properties of ZnO-based pn junctions for light emitting diodes was investigated. The focus was on three issues most pertinent to realizing a ZnO-based solid state lighting technology, namely (1) achieving high p-type carrier concentrations in epitaxial and polycrystalline films, (2) realizing band edge emission from pn homojunctions, and (3) investigating pn heterojunction constructs that should yield efficient light emission. The project engaged established expertise at the University of Florida in ZnO film growth (D. Norton), device fabrication (F. Ren) and wide bandgap photonics (S. Pearton). It addressed p-type doping and junction formation in (Zn,Mg)O alloy thin films. The project employed pulsed laser deposition for film growth. The p-type dopant of interest was primarily phosphorus, given the recent results in our laboratory and elsewhere that this anions can yield p-type ZnO-based materials. The role of Zn interstitials, oxygen vacancies, and/or hydrogen complexes in forming compensating shallow donor levels imposes the need to simultaneously consider the role of in situ and post-growth processing conditions. Temperature-dependent Hall, Seebeck, C-V, and resistivity measurements was used to determine conduction mechanisms, carrier type, and doping. Temperature-dependent photoluminescence was used to determine the location of the acceptor level, injection efficiency, and optical properties of the structures. X-ray diffraction will used to characterize film crystallinity. Using these materials, the fabrication and characterization of (Zn,Mg)O pn homojunction and heterojunction devices was pursued. Electrical characterization of the junction capacitance and I-V behavior was used to extract junction profile and minority carrier lifetime. Electroluminescence from biased junctions was the primary property of interest.« less

  11. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND HOUSING ASSISTANCE RESTRUCTURING PROGRAM (MARK-TO...

  12. 76 FR 69238 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... submitted to the Office of Management and Budget (OMB) for clearance the following proposal for collection... Sustainable Broadband Adoption). Each PPR provides updates on fundamental project milestones and key..., 2011. Gwellnar Banks, Management Analyst, Office of the Chief Information Officer. [FR Doc. 2011-28776...

  13. 36 CFR 218.3 - Reviewing officer.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Agriculture or Under Secretary, Natural Resources and Environment is the reviewing officer. (b) The reviewing... Section 218.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PROJECT-LEVEL... officer is the U.S. Department of Agriculture (USDA) or Forest Service official having the delegated...

  14. 78 FR 64467 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... and Nutrition Service (FNS) annually for approval a Budget Projection Statement (FNS-366A), which... Officer for Agriculture, Office of Information and Regulatory Affairs, Office of Management and Budget... number. Food and Nutrition Service Title: Operating Guidelines, Forms and Waivers. OMB Control Number...

  15. 75 FR 9247 - Multifamily Default Status Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... Report AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The proposed... comments on the subject proposal. Mortgagees use this report to notify HUD that a project owner has... INFORMATION CONTACT: Leroy McKinney Jr., Reports Management Officer, QDAM, Department of Housing and Urban...

  16. 76 FR 80907 - TRICARE Prime Urgent Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Prime Urgent Care Demonstration Project....S. Code, section 1092, entitled Department Of Defense TRICARE Prime Urgent Care Demonstration Project. The demonstration project is intended to test whether allowing four visits to an urgent care...

  17. SP-100, a project manager's view

    NASA Technical Reports Server (NTRS)

    Truscello, Vincent C.

    1983-01-01

    Born to meet the special needs of America's space effort, the SP-100 Program testifies to the cooperation among government agencies. The Department of Energy (DOE), the National Aeronautics and Space Administration (NASA), and the Defense Advanced Research Projects Agency (DARPA) are working together to produce a 100-kW power system for use in outer space. At this point in the effort, it is appropriate to review: The approach to meet program goals; the status of activities of the Project Office, managed by the Jet Propulsion Laboratory (JPL); and, because this is a meeting on materials, answers beings developed by the Project Office to vital questions on refractory alloy technology.

  18. Gap junction-dependent homolog avoidance in the developing CNS.

    PubMed

    Baker, Michael W; Yazdani, Neema; Macagno, Eduardo R

    2013-10-16

    Oppositely directed projections of some homologous neurons in the developing CNS of the medicinal leech (Hirudo verbana), such as the AP cells, undergo a form of contact-dependent homolog avoidance. Embryonic APs extend axons within the connective nerve toward adjacent ganglia, in which they meet and form gap junctions (GJs) with the oppositely directed axons of their segmental homologs, stop growing, and are later permanently retracted (Wolszon et al., 1994a,b). However, early deletion of an AP neuron leads to resumed growth and permanent maintenance of the projections of neighboring APs. Here we test the hypothesis that a GJ-based signaling mechanism is responsible for this instance of homolog avoidance. We demonstrate that selective knockdown of GJ gene Hve-inx1 expression in single embryonic APs, by expressing a short-hairpin interfering RNA, leads to continued growth of the projections of the cell toward, into, and beyond adjacent ganglia. Moreover, the projections of the APs in adjacent ganglia also resume growth, mimicking their responses to cell deletion. Continued growth was also observed when two different INX1 mutant transgenes that abolish dye coupling between APs were expressed. These include a mutant transgene that effectively downregulates all GJ plaques that include the INX1 protein and a closed channel INX1 mutant that retains the adhesive cellular binding characteristic of INX1 GJs but not the open channel pore function. Our results add GJ intercellular communication to the list of molecular signaling mechanisms that can act as mediators of growth-inhibiting cell-cell interactions that define the topography of neuronal arbors.

  19. US Climate Variability and Predictability Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patterson, Mike

    The US CLIVAR Project Office administers the US CLIVAR Program with its mission to advance understanding and prediction of climate variability and change across timescales with an emphasis on the role of the ocean and its interaction with other elements of the Earth system. The Project Office promotes and facilitates scientific collaboration within the US and international climate and Earth science communities, addressing priority topics from subseasonal to centennial climate variability and change; the global energy imbalance; the ocean’s role in climate, water, and carbon cycles; climate and weather extremes; and polar climate changes. This project provides essential one-year supportmore » of the Project Office, enabling the participation of US scientists in the meetings of the US CLIVAR bodies that guide scientific planning and implementation, including the scientific steering committee that establishes program goals and evaluates progress of activities to address them, the science team of funded investigators studying the ocean overturning circulation in the Atlantic, and two working groups tackling the priority research topics of Arctic change influence on midlatitude climate and weather extremes and the decadal-scale widening of the tropical belt.« less

  20. US Climate Variability and Predictability (CLIVAR) Project- Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patterson, Mike

    The US CLIVAR Project Office administers the US CLIVAR Program with its mission to advance understanding and prediction of climate variability and change across timescales with an emphasis on the role of the ocean and its interaction with other elements of the Earth system. The Project Office promotes and facilitates scientific collaboration within the US and international climate and Earth science communities, addressing priority topics from subseasonal to centennial climate variability and change; the global energy imbalance; the ocean’s role in climate, water, and carbon cycles; climate and weather extremes; and polar climate changes. This project provides essential one-year supportmore » of the Project Office, enabling the participation of US scientists in the meetings of the US CLIVAR bodies that guide scientific planning and implementation, including the scientific steering committee that establishes program goals and evaluates progress of activities to address them, the science team of funded investigators studying the ocean overturning circulation in the Atlantic, and two working groups tackling the priority research topics of Arctic change influence on midlatitude climate and weather extremes and the decadal-scale widening of the tropical belt.« less

  1. 77 FR 33446 - Jordan Cove Energy Project, L.P.; Application for Long-Term Authorization to Export Liquefied...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... Resources to Non-Free Trade Agreement Countries for a 25-Year Period AGENCY: Office of Fossil Energy, DOE. ACTION: Notice of application. SUMMARY: The Office of Fossil Energy (FE) of the Department of Energy (DOE... Mail: U.S. Department of Energy (FE-34), Office of Natural Gas Regulatory Activities, Office of Fossil...

  2. Office Space: How Will Technology Affect the Education Office Environment?

    ERIC Educational Resources Information Center

    Day, C. William

    2009-01-01

    The office environment 10 years from now will be different from the one today. More office personnel will be organized around processes rather than functions. More work activities will be done by teams rather than individuals, and those teams will change over time, as will the nature of the work projects and the people who constitute the team. The…

  3. Modeling of Core Competencies in the Registrar's Office

    ERIC Educational Resources Information Center

    Pikowsky, Reta

    2009-01-01

    The Office of the Registrar at the Georgia Institute of Technology, in cooperation with the Office of Human Resources, has been engaged since February 2008 in a pilot project to model core competencies for the leadership team and the staff. It is the hope of the office of Human resources that this pilot will result in a model that can be used…

  4. Critical Research for Cost-Effective Photoelectrochemical Production of Hydrogen

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xu, Liwei; Deng, Xunming; Abken, Anka

    2014-10-29

    The objective of this project is to develop critical technologies required for cost-effective production of hydrogen from sunlight and water using a-Si triple junction solar cell based photo-electrodes. In this project, Midwest Optoelectronics, LLC (MWOE) and its collaborating organizations utilize triple junction a-Si thin film solar cells as the core element to fabricate photoelectrochemical (PEC) cells. Triple junction a-Si/a-SiGe/a-SiGe solar cell is an ideal material for making cost-effective PEC system which uses sun light to split water and generate hydrogen. It has the following key features: 1) It has an open circuit voltage (Voc ) of ~ 2.3V and hasmore » an operating voltage around 1.6V. This is ideal for water splitting. There is no need to add a bias voltage or to inter-connect more than one solar cell. 2) It is made by depositing a-Si/a-SiGe/aSi-Ge thin films on a conducting stainless steel substrate which can serve as an electrode. When we immerse the triple junction solar cells in an electrolyte and illuminate it under sunlight, the voltage is large enough to split the water, generating oxygen at the Si solar cell side (for SS/n-i-p/sunlight structure) and hydrogen at the back, which is stainless steel side. There is no need to use a counter electrode or to make any wire connection. 3) It is being produced in large rolls of 3ft wide and up to 5000 ft long stainless steel web in a 25MW roll-to-roll production machine. Therefore it can be produced at a very low cost. After several years of research with many different kinds of material, we have developed promising transparent, conducting and corrosion resistant (TCCR) coating material; we carried out extensive research on oxygen and hydrogen generation catalysts, developed methods to make PEC electrode from production-grade a-Si solar cells; we have designed and tested various PEC module cases and carried out extensive outdoor testing; we were able to obtain a solar to hydrogen conversion efficiency (STH) about 5.7% and a running time about 480 hrs, which are very promising results; we have also completed a techno-economic analysis of our PEC system, which indicates that a projected hydrogen generation cost of $2/gge is achievable with a 50 Ton-per-day (TPD) scale under certain conditions.« less

  5. 34 CFR 222.141 - For what types of projects may the Secretary provide assistance under section 8008 of the Act?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false For what types of projects may the Secretary provide assistance under section 8008 of the Act? 222.141 Section 222.141 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND SECONDARY EDUCATION, DEPARTMENT OF EDUCATION IMPACT AID...

  6. TRU waste lead organization -- WIPP Project Office Interface Management semi-annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guerrero, J.V.; Gorton, J.M.

    1985-05-01

    The Charter establishing the Interface Control Board and the administrative organization to manage the interface of the TRU Waste Lead Organization and the WIPP Project Office also requires preparation of a summary report describing significant interface activities.'' This report includes a discussion of Interface Working Group (IWG) recommendations and resolutions considered and implemented'' over the reporting period October 1984 to March 1985.

  7. Development and Pilot Test of a Career-Oriented, Peer-Instructional Model in the Office Cluster of Business Occupations. Final Report.

    ERIC Educational Resources Information Center

    Hungerland, Jacklyn; And Others

    This project was conducted to design an instructional model capable of producing high levels of student motivation and proficiency, using the office cluster of business occupations as a vehicle, and to formulate a plan for field implementation and evaluation of the model. To achieve the objectives, project personnel, secondary business teachers,…

  8. 24 CFR 401.480 - Sale or transfer of project.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND HOUSING ASSISTANCE RESTRUCTURING...

  9. 24 CFR 401.480 - Sale or transfer of project.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND HOUSING ASSISTANCE RESTRUCTURING...

  10. 24 CFR 401.480 - Sale or transfer of project.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND HOUSING ASSISTANCE RESTRUCTURING...

  11. View of front (north) and east walls of the Office, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of front (north) and east walls of the Office, Childs power plant. Rock cairn in front frames the 1976 National Historic Mechanical Engineering plaque. Looking southeast - Childs-Irving Hydroelectric Project, Childs System, Office, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  12. External Research in AISD: Knowledge for Building, 1982-83.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    The Austin Independent School District (AISD) Office of Research and Development, presents abstracts of research projects conducted by external agencies or individuals within AISD. For 33 projects, this report contains the AISD project number, project title, project director, project sponsor, schools where conducted, and whether or not a full…

  13. Precise Heater Controller with rf-Biased Josephson Junctions

    NASA Technical Reports Server (NTRS)

    Green, Colin J.; Sergatskov, Dmitri A.; Duncan, R. V.

    2003-01-01

    Paramagnetic susceptibility thermometers used in fundamental physics experiments are capable of measuring temperature changes with a precision of a part in 2 x 10(exp 10). However, heater controllers are only able to control open-loop power dissipation to about a part in 10(exp 5). We used an array of rf-biased Josephson junctions to precisely control the electrical power dissipation in a heater resistor mounted on a thermally isolated cryogenic platform. Theoretically, this method is capable of controlling the electrical power dissipation to better than a part in 10(exp 12). However, this level has not yet been demonstrated experimentally. The experiment consists of a liquid helium cell that also functions as a high-resolution PdMn thermometer, with a heater resistor mounted on it. The cell is thermally connected to a temperature-controlled cooling stage via a weak thermal link. The heater resistor is electrically connected to the array of Josephson junctions using superconducting wire. An rf-biased array of capacitively shunted Josephson junctions drives the voltage across the heater. The quantized voltage across the resistor is Vn = nf(h/2e), where h is Planck's constant, f is the array biasing frequency, e is the charge of an electron, and n is the integer quantum state of the Josephson array. This results in an electrical power dissipation on the cell of Pn = (Vn)(sup 2/R), where R is the heater resistance. The change of the quantum state of the array changes the power dissipated in the heater, which in turn, results in the change of the cell temperature. This temperature change is compared to the expected values based on the known thermal standoff resistance of the cell from the cooling stage. We will present our initial experimental results and discuss future improvements. This work has been funded by the Fundamental Physics Discipline of the Microgravity Science Office of NASA, and supported by a no-cost equipment loan from Sandia National Laboratories.

  14. Terahertz Mixing Characteristics of NbN Superconducting Tunnel Junctions and Related Astronomical Observations

    NASA Astrophysics Data System (ADS)

    Li, J.

    2010-01-01

    High-sensitivity superconducting SIS (superconductor-insulator-superconductor) mixers are playing an increasingly important role in the terahertz (THz) astronomical observation, which is an emerging research frontier in modern astrophysics. Superconducting SIS mixers with niobium (Nb) tunnel junctions have reached a sensitivity close to the quantum limit, but have a frequency limit about 0.7 THz (i.e., gap frequency of Nb tunnel junctions). Beyond this frequency Nb superconducting films will absorb energetic photons (i.e., energy loss) to break Cooper pairs, thereby resulting in significant degradation of the mixer performance. Therefore, it is of particular interest to develop THz superconducting SIS mixers incorporating tunnel junctions with a larger energy gap. Niobium-nitride (NbN) superconducting tunnel junctions have been long known for their large energy gap, almost double that of Nb ones. With the introduction of epitaxially grown NbN films, the fabrication technology of NbN superconducting tunnel junctions has been considerably improved in the recent years. Nevertheless, their performances are still not as good as Nb ones, and furthermore they are not yet demonstrated in real astronomical applications. Given the facts mentioned above, in this paper we systematically study the quantum mixing behaviors of NbN superconducting tunnel junctions in the THz regime and demonstrate an astronomical testing observation with a 0.5 THz superconducting SIS mixer developed with NbN tunnel junctions. The main results of this study include: (1) successful design and fabrication of a 0.4˜0.6 THz waveguide mixing circuit with the high-dielectric-constant MgO substrate; (2) successful fabrication of NbN superconducting tunnel junctions with the gap voltage reaching 5.6 mV and the quality factor as high as 15; (3) demonstration of a 0.5 THz waveguide NbN superconducting SIS mixer with a measured receiver noise temperature (no correction) as low as five times the quantum limit (5hω/kB), which is the best among NbN superconducting SIS mixers developed in this frequency band; (4) demonstration of high sensitivity for NbN superconducting SIS mixers operated at temperatures as high as 10 K, and demonstration of much less interference resulting from the Josephson effect; (5) demonstration of the first astronomical observation ever done with an NbN superconducting SIS mixer. This study has provided further understanding of the quantum mixing behaviors of NbN superconducting SIS mixers. It has been demonstrated that NbN superconducting SIS mixers can reach nearly quantum-limited sensitivity and have good stability. Furthermore, NbN superconducting SIS mixers have less stringent requirement for cooling and magnetic field compared with Nb ones. Hence they can be used in astronomical applications, especially for space-borne projects and complex systems such as multi-beam receivers.

  15. Generating Enhanced Natural Environments and Terrain for Interactive Combat Simulations (GENETICS)

    DTIC Science & Technology

    2005-09-01

    split to avoid T-junctions ........................................................................52 Figure 2-23 Longest edge bisection...database. This feature allows trainers the flexibility to use the same terrain repeatedly or use a new one each time, forcing trainees to avoid ...model are favored to create a good surface approximation. Cracks are avoided by projecting primitives and their respective textures onto multiple

  16. Dualities of deformed N=2 SCFTs from link monodromy on D3-brane states

    NASA Astrophysics Data System (ADS)

    Grassi, Antonella; Halverson, James; Ruehle, Fabian; Shaneson, Julius L.

    2017-09-01

    We study D3-brane theories that are dually described as deformations of two different N=2 superconformal theories with massless monopoles and dyons. These arise at the self-intersection of a seven-brane in F-theory, which cuts out a link on a small three-sphere surrounding the self-intersection. The spectrum is studied by taking small loops in the three-sphere, yielding a link-induced monodromy action on string junction D3-brane states, and subsequently quotienting by the monodromy. This reduces the differing flavor algebras of the N=2 theories to the same flavor algebra, as required by duality, and projects out charged states, yielding an N=1 superconformal theory on the D3-brane. In one, a deformation of a rank one Argyres-Douglas theory retains its SU(2) flavor symmetry and exhibits a charge neutral flavor triplet that is comprised of electron, dyon, and monopole string junctions. From duality we argue that the monodromy projection should also be imposed away from the conformal point, in which case the D3-brane field theory appears to exhibit confinement of electrons, dyons, and monopoles. We will address the mathematical counterparts in a companion paper.

  17. A Virtual Collaborative Environment for Mars Surveyor Landing Site Studies

    NASA Technical Reports Server (NTRS)

    Gulick, V.C.; Deardorff, D. G.; Briggs, G. A.; Hand, K. P.; Sandstrom, T. A.

    1999-01-01

    Over the past year and a half, the Center for Mars Exploration (CMEX) at NASA Ames Research Center (ARC) has been working with the Mars Surveyor Project Office at JPL to promote interactions among the planetary community and to coordinate landing site activities for the Mars Surveyor Project Office. To date, CMEX has been responsible for organizing the first two Mars Surveyor Landing Site workshops, web-archiving resulting information from these workshops, aiding in science evaluations of candidate landing sites, and serving as a liaison between the community and the Project. Most recently, CMEX has also been working with information technologists at Ames to develop a state-of-the-art collaborative web site environment to foster interaction of interested members of the planetary community with the Mars Surveyor Program and the Project Office. The web site will continue to evolve over the next several years as new tools and features are added to support the ongoing Mars Surveyor missions.

  18. Response of a SET to large rf interference signals

    NASA Astrophysics Data System (ADS)

    Lewis, Rupert; Harris, C. Thomas; Shaner, Eric

    Single electron transistors (SETs) fabricated from aluminum thin films and Al/AlOx Josephson tunnel junctions can be added to other structures as charge sensors with large intrinsic bandwidth-for example, the charge sensing corral of an electrons on helium quantum chip. We characterized a SET at temperature T =40 mk for its ability to tolerate extraneous radio frequency (rf) interference in such applications at frequencies from 10 kHz to 50 MHz. Our SET, with charging energy, Ec 1 K, normal resistance Rn 600 k Ω, and peak measured charge sensitivity of Sp = 5 × 10-5electrons/ √Hz maintained usable sensitivity (S <1 × 10-3electrons/ √Hz) when subjected to rf signals of strength greater than +/- 9 electrons. This suggests for frequencies well below fc 1/2 πRnCj where Cj is the junction capacitance, that SETs respond nearly instantaneously even to large rf signals. Exploiting this knowledge, we were able to cancel a known rf signal at 1 MHz nearly recovering the charge sensitivity in the absence of rf signals-a result we expect will hold to higher frequencies. Work performed, in part, at the Center for Integrated Nanotechnologies, an Office of Science User Facility operated for the U.S. Department of Energy (DOE) Office of Science by Los Alamos National Laboratory (Contract DE-AC52-06NA25396) and Sandia National Laboratories (Contract DE-AC04-94AL85000). Sandia National Laboratories is a multi-mission laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

  19. 78 FR 36564 - 30-Day Notice of Proposed Information Collection: Delegated Processing for Certain 202 Supportive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... Information Collection: Delegated Processing for Certain 202 Supportive Housing for the Elderly Projects AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed information collection requirement described below to the Office of Management and Budget (OMB...

  20. Results of Workshops on Privacy Protection Technologies

    NASA Astrophysics Data System (ADS)

    Landwehr, Carl

    This talk summarizes the results of a series of workshops on privacy protecting technologies convened in the fall of 2006 by the Office of the Director of National Intelligence through its Civil Liberties Protection Office and the (then) Disruptive Technology Office (now part of the Intelligence Advanced Research Projects Activity, IARPA).

  1. Gulf of Mexico Hypoxia Research Program Data Report 2002-2007

    EPA Science Inventory

    The work described in this report summarizes the data collected during 12 oceanographic cruises conducted from 2002-2007. The project was supported by the US EPA Office of Research and Development, in partnership with the US EPA Gulf of Mexico Program Office, the Office of Water,...

  2. 77 FR 11539 - Agency Forms Undergoing Paperwork Reduction Act Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... (CDC) publishes a list of information collection requests under review by the Office of Management and... . Send written comments to CDC Desk Officer, Office of Management and Budget, Washington, DC 20503 or by... Project Evaluation of Dating Matters: Strategies to Promote Healthy Teen Relationships\\TM\\--New--National...

  3. 78 FR 9729 - Proposed Information Collection; Comment Request: NPS Institutional Animal Care and Use Committee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Park Service) have submitted to the Office of Management and Budget (OMB) the information collection...), and the Interagency Research Animal Committee (IRAC) principles for projects involving the use of... of Management and Budget (OMB) Office of Information and Regulatory Affairs, Attention: Desk Officer...

  4. 75 FR 51272 - Proposed Collection; Comment Request; STAR METRICS-Science and Technology in America's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... data collection projects, the Office of Science Policy Analysis (OSPA), the National Institutes of..., Health Science Policy Analyst, Office of Science and Technology Policy, OSP, OD; NIH, Building 1, Room... this publication. Dated: August 12, 2010. Lynn D. Hudson, Director, Office of Science Policy Analysis...

  5. 7 CFR 2.97 - Director, Office of the Executive Secretariat.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... and related records management functions for the Office of the Secretary. (2) Provide administrative, editorial, and project management support services to the Immediate Office of the Secretary. (b) [Reserved] ... to § 2.24(a)(10), and with due deference for delegations to other Departmental Management officials...

  6. 7 CFR 2.97 - Director, Office of the Executive Secretariat.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and related records management functions for the Office of the Secretary. (2) Provide administrative, editorial, and project management support services to the Immediate Office of the Secretary. (b) [Reserved] ... to § 2.24(a)(10), and with due deference for delegations to other Departmental Management officials...

  7. 7 CFR 2.97 - Director, Office of the Executive Secretariat.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... and related records management functions for the Office of the Secretary. (2) Provide administrative, editorial, and project management support services to the Immediate Office of the Secretary. (b) [Reserved] ... to § 2.24(a)(10), and with due deference for delegations to other Departmental Management officials...

  8. 7 CFR 2.97 - Director, Office of the Executive Secretariat.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and related records management functions for the Office of the Secretary. (2) Provide administrative, editorial, and project management support services to the Immediate Office of the Secretary. (b) [Reserved] ... to § 2.24(a)(10), and with due deference for delegations to other Departmental Management officials...

  9. 77 FR 36998 - Notice of Availability of a Draft Programmatic Environmental Assessment for Office of Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... Draft Programmatic Environmental Assessment for Office of Coast Survey Hydrographic Survey Projects... Programmatic Environmental Assessment; Request for comments. SUMMARY: NOAA's Office of Coast Survey (OCS) seeks comment on a draft programmatic environmental assessment (PEA) of the hydrographic surveys and related...

  10. Three-dimensional choroidal segmentation in spectral OCT volumes using optic disc prior information

    NASA Astrophysics Data System (ADS)

    Hu, Zhihong; Girkin, Christopher A.; Hariri, Amirhossein; Sadda, SriniVas R.

    2016-03-01

    Recently, much attention has been focused on determining the role of the peripapillary choroid - the layer between the outer retinal pigment epithelium (RPE)/Bruchs membrane (BM) and choroid-sclera (C-S) junction, whether primary or secondary in the pathogenesis of glaucoma. However, the automated choroidal segmentation in spectral-domain optical coherence tomography (SD-OCT) images of optic nerve head (ONH) has not been reported probably due to the fact that the presence of the BM opening (BMO, corresponding to the optic disc) can deflect the choroidal segmentation from its correct position. The purpose of this study is to develop a 3D graph-based approach to identify the 3D choroidal layer in ONH-centered SD-OCT images using the BMO prior information. More specifically, an initial 3D choroidal segmentation was first performed using the 3D graph search algorithm. Note that varying surface interaction constraints based on the choroidal morphological model were applied. To assist the choroidal segmentation, two other surfaces of internal limiting membrane and innerouter segment junction were also segmented. Based on the segmented layer between the RPE/BM and C-S junction, a 2D projection map was created. The BMO in the projection map was detected by a 2D graph search. The pre-defined BMO information was then incorporated into the surface interaction constraints of the 3D graph search to obtain more accurate choroidal segmentation. Twenty SD-OCT images from 20 healthy subjects were used. The mean differences of the choroidal borders between the algorithm and manual segmentation were at a sub-voxel level, indicating a high level segmentation accuracy.

  11. 13 CFR 305.12 - Project sign.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....12 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the Federal government is participating in the Project. The EDA regional office will provide mandatory...

  12. Overcoming the Fundamental Bottlenecks to a new world-record silicon solar cell. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rohatgi, Ajeet; Zimbardi, Francesco; Rounsaville, Brian

    The objective of the work performed within this contract is to reveal the materials and device physics that currently limit the experimental world record efficiency to 25% for single junction Si (2013), and to demonstrate 26.5% efficiency. The starting efficiency for this project was 23.9% in 2013. Four strategies are being combined throughout the project to achieve 26.5% cell efficiency: (1) passivated contacts via tunnel dielectrics, (2) emitter optimization and passivation through dopant profile engineering, (3) enhanced light trapping through development of photonic crystals and (4) base optimization.

  13. 76 FR 6121 - Information Collection; Submission for OMB Review, Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-03

    ... used by NCCC projects and partnerships office to collect project performance data. Type of Review: New... year. Assuming the distribution of project types remains constant, the number of survey sections...

  14. Cradle Enhanced UI Development

    NASA Technical Reports Server (NTRS)

    Jentsch, Samuel

    2016-01-01

    This summer I have been working in the EDI (Exploration, Development, and Integration) office. The primary goal of my office is to facilitate the integration, cooperation, and communication between programs, projects and departments throughout the agency. The majority of my efforts has been focused on Cradle, a requirements management and systems engineering tool. This tool is utilized by teams throughout NASA to plan and track the development of a variety of ongoing projects.

  15. Extraction of physical Schottky parameters using the Lambert function in Ni/AlGaN/GaN HEMT devices with defined conduction phenomena

    NASA Astrophysics Data System (ADS)

    Latry, O.; Divay, A.; Fadil, D.; Dherbécourt, P.

    2017-01-01

    Electrical characterization analyses are proposed in this work using the Lambert function on Schottky junctions in GaN wide band gap semiconductor devices for extraction of physical parameters. The Lambert function is used to give an explicit expression of the current in the Schottky junction. This function is applied with defined conduction phenomena, whereas other work presented arbitrary (or undefined) conduction mechanisms in such parameters’ extractions. Based upon AlGaN/GaN HEMT structures, extractions of parameters are undergone in order to provide physical characteristics. This work highlights a new expression of current with defined conduction phenomena in order to quantify the physical properties of Schottky contacts in AlGaN/GaN HEMT transistors. Project supported by the French Department of Defense (DGA).

  16. [Earth Science Technology Office's Computational Technologies Project

    NASA Technical Reports Server (NTRS)

    Fischer, James (Technical Monitor); Merkey, Phillip

    2005-01-01

    This grant supported the effort to characterize the problem domain of the Earth Science Technology Office's Computational Technologies Project, to engage the Beowulf Cluster Computing Community as well as the High Performance Computing Research Community so that we can predict the applicability of said technologies to the scientific community represented by the CT project and formulate long term strategies to provide the computational resources necessary to attain the anticipated scientific objectives of the CT project. Specifically, the goal of the evaluation effort is to use the information gathered over the course of the Round-3 investigations to quantify the trends in scientific expectations, the algorithmic requirements and capabilities of high-performance computers to satisfy this anticipated need.

  17. Laboratory Directed Research and Development Program FY2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none, none

    2012-04-27

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shoaf, C.R.; Guth, D.J.

    The Air Risk Information Support Center (Air RISC) was initiated in early 1988 by the US Environmental Protection Agency`s (EPA) Office of Health and Environmental Assessment (OHEA) and the Office of Air Quality Planning and Standards (OAQPS) as a technology transfer effort that would focus on providing information to state and local environmental agencies and to EPA Regional Offices in the areas of health, risk, and exposure assessment for toxic air pollutants. Technical information is fostered and disseminated by Air RISCs three primary activities: (1) a {open_quotes}hotline{close_quotes}, (2) quick turn-around technical assistance projects, and (3) general technical guidance projects. 1more » ref., 2 figs.« less

  19. TTP AL921102: An integrated geophysics program for non-intrusive characterization of mixed-waste landfill sites. FY 1992 year-end progress report: Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hasbrouck, J.C.

    1992-11-01

    Chem-Nuclear Geotech, Inc. (Geotech), operating contractor for the US Department of Energy Grand Junction Projects Office, is conducting the Integrated Geophysics Program for Non-Intrusive Characterization of Mixed-Waste Landfill Sites (Technical Task Plan [TTP] AL921102). The TTP is part of the Mixed-Waste Landfill Integrated Demonstration (MWLID). The objective of this task was to demonstrate that an integrated program of surface geophysics can be used to effectively and nonintrusively characterize n-mixed-waste landfill sites. To accomplish this objective, integrated field demonstrations were conducted over two previously identified areas of interest (designated Areas A and B) within the MWLID test site at the Chemicalmore » Waste Landfill (CWL), Technical Area 3, at the Sandia National Laboratories, Albuquerque, New Mexico (Figures 1 and 2). Area A was centered roughly around the Chromic Acid and Organics Pits in the southeast-central portion of the landfill and Area B was centered around the ``60`s Pits`` area in the northeast-central portion of the landfill. Pit locations were known in Area A and suspected in Area B. This progress report describes the geophysical surveys conducted by Geotech and presents preliminary displays and analyses. Volume 2 of this report contains the raw data for all the surveys conducted by Geotech for this TTP.« less

  20. TTP AL921102: An integrated geophysics program for non-intrusive characterization of mixed-waste landfill sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hasbrouck, J.C.

    1992-11-01

    Chem-Nuclear Geotech, Inc. (Geotech), operating contractor for the US Department of Energy Grand Junction Projects Office, is conducting the Integrated Geophysics Program for Non-Intrusive Characterization of Mixed-Waste Landfill Sites (Technical Task Plan [TTP] AL921102). The TTP is part of the Mixed-Waste Landfill Integrated Demonstration (MWLID). The objective of this task was to demonstrate that an integrated program of surface geophysics can be used to effectively and nonintrusively characterize n-mixed-waste landfill sites. To accomplish this objective, integrated field demonstrations were conducted over two previously identified areas of interest (designated Areas A and B) within the MWLID test site at the Chemicalmore » Waste Landfill (CWL), Technical Area 3, at the Sandia National Laboratories, Albuquerque, New Mexico (Figures 1 and 2). Area A was centered roughly around the Chromic Acid and Organics Pits in the southeast-central portion of the landfill and Area B was centered around the 60's Pits'' area in the northeast-central portion of the landfill. Pit locations were known in Area A and suspected in Area B. This progress report describes the geophysical surveys conducted by Geotech and presents preliminary displays and analyses. Volume 2 of this report contains the raw data for all the surveys conducted by Geotech for this TTP.« less

  1. Bilingual Vocational Education. Project Abstracts 1987-1988.

    ERIC Educational Resources Information Center

    Office of Vocational and Adult Education (ED), Washington, DC.

    Abstracts are provided for 16 bilingual vocational education projects offered in 1987-88. Each abstract provides information on: grantee; state; project title; project director, address, and telephone number; project officer and U.S. Department of Education address; language group(s) served; occupational skills area(s); length of training cycle…

  2. General setting from alley, office to left, concrete structure in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    General setting from alley, office to left, concrete structure in center foreground, garage/shop to right, view to northeast - Former Umatilla Project Headquarters Buildings, Hermiston, Umatilla County, OR

  3. 48 CFR 48.001 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... Contracting office includes any contracting office that the acquisition is transferred to, such as another... projected learning or changes in quantity during the sharing period. It is calculated at the time the VECP...

  4. 50 CFR 21.4 - Information collection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to the Service Information Collection Control Officer, MS-222 ARLSQ, U.S. Fish and Wildlife Service, Washington, DC 20240, or the Office of Management and Budget, Paperwork Reduction Project (1018-0022...

  5. 10 CFR 1049.9 - Firearms and firearms incidents.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... immediately, and to the SPR Project Management Office Security Division within 24 hours. The Strategic... FORCE OFFICERS OF THE STRATEGIC PETROLEUM RESERVE § 1049.9 Firearms and firearms incidents. (a...

  6. 10 CFR 1049.9 - Firearms and firearms incidents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... immediately, and to the SPR Project Management Office Security Division within 24 hours. The Strategic... FORCE OFFICERS OF THE STRATEGIC PETROLEUM RESERVE § 1049.9 Firearms and firearms incidents. (a...

  7. 5 CFR 470.303 - Eligible parties.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.303... demonstration projects under 5 U.S.C. 4701(a)(1) and 4701(b) may conduct demonstration projects after approval...

  8. 76 FR 12717 - Disability and Rehabilitation Research Projects and Centers Program; Field Initiated (FI...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... DEPARTMENT OF EDUCATION Disability and Rehabilitation Research Projects and Centers Program; Field...; National Institute on Disability and Rehabilitation Research (NIDRR)--Disability and Rehabilitation Research Projects and Centers Program--Field Initiated (FI) Projects AGENCY: Office of Special Education...

  9. 2015 Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    In the spring and summer of 2015, the Bioenergy Technologies Office (BETO or the Office) of the U.S. Department of Energy (DOE) implemented an external peer review of the projects in its research, development and demonstration (RD&D) portfolio. The Office manages a diverse portfolio of technologies across the spectrum of applied RD&D within the dynamic context of changing budgets and Administration priorities. The Office portfolio is organized according to the biomass-to-bioenergy supply chain—from the feedstock source to the end user (see Figure 1)—with major focus on feedstock supply and biomass conversion. The 2015 Project Peer Review took place March 23-27,more » 2015, outside of Washington, D.C., in Alexandria, Virginia, and evaluated most of the publicly funded projects in BETO’s portfolio. The subsequent Program Management Review took place on June 25, 2015, in Washington, D.C., and provided an Office- level assessment of strategic planning and programmatic initiatives. The peer review process enables external stakeholders to provide feedback on the responsible use of taxpayer funding and develop recommendations for the most efficient and effective ways to accelerate the development of an advanced bioenergy industry. The planning and execution of these reviews was completed over the course of 10 months, and this report includes the results of both events.« less

  10. KSC-2012-1547

    NASA Image and Video Library

    2012-02-23

    ORLANDO, Fla. -- Representatives from NASA’s Glenn Research Center, located in Cleveland, provide information on their center’s programs and projects to participants in NASA’s Project Management Challenge 2012. PM Challenge 2012 was held at the Caribe Royale Hotel and Convention Center in Orlando, Fla., on February 22-23, to provide a forum for all stakeholders in the project management community to meet and share stories, lessons learned and new uses of technology in the industry. The PM Challenge is sponsored by NASA's Office of the Chief Engineer. For additional information, visit http://www.nasa.gov/offices/oce/pmchallenge/index.html. Photo credit: NASA/Jim Grossmann

  11. KSC-2012-1548

    NASA Image and Video Library

    2012-02-23

    ORLANDO, Fla. -- Representatives from NASA’s Wallops Flight Facility, located in Virginia, provide information on their center’s programs and projects to participants in NASA’s Project Management Challenge 2012. PM Challenge 2012 was held at the Caribe Royale Hotel and Convention Center in Orlando, Fla., on February 22-23, to provide a forum for all stakeholders in the project management community to meet and share stories, lessons learned and new uses of technology in the industry. The PM Challenge is sponsored by NASA's Office of the Chief Engineer. For additional information, visit http://www.nasa.gov/offices/oce/pmchallenge/index.html. Photo credit: NASA/Jim Grossmann

  12. Sustainable Energy in Remote Indonesian Grids. Accelerating Project Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hirsch, Brian; Burman, Kari; Davidson, Carolyn

    2015-06-30

    Sustainable Energy for Remote Indonesian Grids (SERIG) is a U.S. Department of Energy (DOE) funded initiative to support Indonesia’s efforts to develop clean energy and increase access to electricity in remote locations throughout the country. With DOE support, the SERIG implementation team consists of the National Renewable Energy Laboratory (NREL) and Winrock International’s Jakarta, Indonesia office. Through technical assistance that includes techno-economic feasibility evaluation for selected projects, government-to-government coordination, infrastructure assessment, stakeholder outreach, and policy analysis, SERIG seeks to provide opportunities for individual project development and a collective framework for national replication office.

  13. Racial Differences in Resolving Conflicts: A Comparison between Black and White Police Officers

    ERIC Educational Resources Information Center

    Sun, Ivan Y.; Payne, Brian K.

    2004-01-01

    This study examined the behavioral differences between Black and White police officers in handling interpersonal conflicts. Observational and survey data from the Project on Policing Neighborhoods and the 1990 census data were used. Actions taken by officers are examined along two behavioral dimensions: coercion and support. Findings show that…

  14. At Home in the Office. A Guide for the Home Worker.

    ERIC Educational Resources Information Center

    Thomas, Neil; And Others

    This guide provides information to persons interested in establishing a work-at-home program, specifically those in clerical or support staff positions who use modern automated office equipment. The text is divided into two sections. The Home Worker section provides a summary of the At Home in the Office Project, personality characteristics…

  15. 78 FR 25258 - Notice of Availability (NOA) for Sharpe Permit Relinquishment Project Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ..., California 95440 and at the Defense Distribution Depot San Joaquin--Tracy Site Public Affairs Office, 2600 S... Distribution Depot San Joaquin--Tracy Site Public Affairs Office at (209) 839-4226. ADDRESSES: You may submit..., VA 22350- 3100. FOR FURTHER INFORMATION CONTACT: Public Affairs Office, Tracy, California, (209) 839...

  16. 75 FR 55585 - Proposed Collection; Comment Request; Generic Clearance for Surveys of Customers and Partners of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ... Request; Generic Clearance for Surveys of Customers and Partners of the Office of Extramural Research of... collection projects, the Office of Extramural Research (OER), the National Institutes of Health (NIH) will... and Partners of the Office of Extramural Research of the National Institutes of Health. Type of...

  17. Manning Army Equal Opportunity Officer Positions

    DTIC Science & Technology

    2013-03-01

    equality , and other social dynamics. This long overdue initiative identified organizational and cultural impediments that had essentially prevented...Manning Army Equal Opportunity Officer Positions by Colonel Angela M. Odom United States Army...TYPE STRATEGY RESEARCH PROJECT .33 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Manning Army Equal Opportunity Officer Positions 5a

  18. A Planning Study to Determine the Feasibility of Developing a New Business and Office Education Curriculum. Moonshot--An Office Occupation Curriculum. Final Report.

    ERIC Educational Resources Information Center

    Lanham, Frank W.

    The purpose of this study was to explore the feasibility of utilizing the systems approach in developing an office occupations curriculum congruent with the concepts in the organic curriculum theory. The title of this project is New Office and Business Education Learning System (NOBELS). An analog system model was developed as the framework in…

  19. The Feasibility of Instituting a Department Head Screen in the Naval Special Warfare Community.

    DTIC Science & Technology

    1985-12-01

    community, and through use of the Structured Accession Planning System for Officers (STRAP-O) model, projects the community from 1985 to 1991 both with and...Placement Officer. It looks at the current state of the NSW community, and through use of the Structured Accession Planning System for Officers (STRAP-0...ACCESSION PLANNING SYSTEM FOR OFFICERS----------------------------------------19 Ill. NAVAL SPECIAL WARFARE COMMUNITY RESPONSE TO PROPOSAL

  20. 50 CFR 22.4 - Information collection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Information Collection Control Officer, MS-222 ARLSQ, U.S. Fish and Wildlife Service, Washington, DC 20240, or the Office of Management and Budget, Paperwork Reduction Project (1018-0022 and 1018-0136), Washington...

  1. Notification: Evaluation of Laboratory Equipment Utilization

    EPA Pesticide Factsheets

    Project #OPE-FY14-0024, April 08, 2014. The Office of Inspector General plans to begin preliminary research on equipment utilization within the U.S. Environmental Protection Agency Office of Research and Development.

  2. Photos | NOAA Gulf Spill Restoration

    Science.gov Websites

    Projects Near You Strategic Frameworks Monitoring and Adaptive Management Restoration Areas Alabama Florida Restoration Menu Home Restoration Areas About Us Data How We Restore Media & News NOAA Offices Office of

  3. Polarized Ends of Human Macula Densa Cells: Ultrastructural Investigation and Morphofunctional Correlations.

    PubMed

    Cangiotti, Angela Maria; Lorenzi, Teresa; Zingaretti, Maria Cristina; Fabri, Mara; Morroni, Manrico

    2018-05-01

    The morphology of the kidney macula densa (MD) has extensively been investigated in animals, whereas human studies are scanty. We studied the fine structure of human MD cells focusing on their apical and basal ends and correlating structure and function. The MD region was examined by transmission electron microscopy in six renal biopsies from patients with kidney disease. Ultrastructural analysis of MD cells was performed on serial sections. MD cells show two polarized ends. The apical portion is characterized by a single, immotile cilium associated with microvilli; apically, cells are joined by adhering junctions. In the basal portion, the cytoplasm contains small, dense granules and numerous, irregular cytoplasmic projections extending to the adjacent extraglomerular mesangium. The projections often contain small, dense granules. A reticulated basement membrane around MD cells separates them from the extraglomerular mesangium. Although the fact that tissue specimens came from patients with kidney disease mandates extreme caution, ultrastructural examination confirmed that MD cells have sensory features due to the presence of the primary cilium, that they are connected by apical adhering junctions forming a barrier that separates the tubular flow from the interstitium, and that they present numerous basal interdigitations surrounded by a reticulated basement membrane. Conceivably, the latter two features are related to the functional activity of the MD. The small, dense granules in the basal cytoplasm and in cytoplasmic projections are likely related to the paracrine function of MD cells. Anat Rec, 301:922-931, 2018. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  4. 75 FR 77379 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... Personnel Management Demonstration Project, Department of Navy, Office of Naval Research; Notice #0;#0..., authorizes the Secretary of Defense (SECDEF) to conduct personnel management demonstration projects at... to execute a process and plan to employ the Department's personnel management demonstration project...

  5. National Workplace Literacy Program. 1993 Abstracts.

    ERIC Educational Resources Information Center

    Office of Vocational and Adult Education (ED), Washington, DC. National Workplace Literacy Program.

    This publication presents the abstracts of the 57 National Workplace Literacy Program 1993 projects. Each abstract provides the following information: project title; award number; project director; awardee; address; telephone and fax numbers; funds by fiscal year (federal and nonfederal); award period; federal project officer; objectives;…

  6. 76 FR 12080 - TRICARE Access to Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Access to Care Demonstration Project AGENCY..., Section 1092, entitled Department of Defense TRICARE Access to Care Demonstration Project. The demonstration project is intended to improve access to urgent care including minor illness or injury for Coast...

  7. 7 CFR 1778.7 - Project priority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Project priority. 1778.7 Section 1778.7 Agriculture... (CONTINUED) EMERGENCY AND IMMINENT COMMUNITY WATER ASSISTANCE GRANTS § 1778.7 Project priority. Paragraph (d... to determine the proposed project's priority for available funds. (b) State Office review. All...

  8. 7 CFR 1778.7 - Project priority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Project priority. 1778.7 Section 1778.7 Agriculture... (CONTINUED) EMERGENCY AND IMMINENT COMMUNITY WATER ASSISTANCE GRANTS § 1778.7 Project priority. Paragraph (d... to determine the proposed project's priority for available funds. (b) State Office review. All...

  9. 7 CFR 1778.7 - Project priority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Project priority. 1778.7 Section 1778.7 Agriculture... (CONTINUED) EMERGENCY AND IMMINENT COMMUNITY WATER ASSISTANCE GRANTS § 1778.7 Project priority. Paragraph (d... to determine the proposed project's priority for available funds. (b) State Office review. All...

  10. The Hubble Space Telescope's Student ERO Pilot Project: Implementing Formal and Informal Collaborative Projects

    NASA Astrophysics Data System (ADS)

    Eisenhamer, Bonnie; Ryer, H.; McCallister, D.; Taylor, J.; Bishop, M.

    2010-05-01

    The Hubble Space Telescope's Early Release Observations (EROs) were revealed to the public on September 9, 2009, and K-12 students and educators in six states across the country are joining in the celebration. Students and educators in Maryland, Ohio, New York, California, New Mexico, and Delaware have been invited to participate in the Hubble Space Telescope's Student ERO Pilot Project. This is an interdisciplinary project created by STScI's Office of Public Outreach in which students research the four ERO objects and create various types of projects. In recognition of their participation, the projects are displayed at host institutions in each state (museum, science center, school, planetarium or library) during a special public event for participating students, their families, and teachers. As part of its evaluation program, STScI's Office of Public Outreach has been conducting an evaluation of the project to determine the viability and potential of conducting large-scale, formal/informal collaborative projects in the future. This poster will highlight preliminary findings and share lessons learned.

  11. Lessons Learned from the 14-Year Systems Development of the Marine Corps Standard Accounting, Budgeting and Reporting System (SABRS)

    DTIC Science & Technology

    1994-03-01

    22202-4302. and to the Office of Managmnt and Budget, Paperwork Reduction Project (0704-0188) Wahington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2...Project Officer ........................ 49 d. Program Management ..................... 50 2. User/Systems Development Team Relationship ...... 52 D...and 60’s, when programming and systems development was in its infancy, virtually all software was custom -made. The programmer designed, coded

  12. Reason and Change in Elementary Education; National Conference, The U. S. Office of Education Tri-University Project in Elementary Education (2nd, New Orleans, February 1-3, 1968).

    ERIC Educational Resources Information Center

    1968

    This document records the proceedings of the Second National Conference of the U. S. Office of Education Tri-University Project in Elementary Education, the theme of which was "Reason and Change in Elementary Education." Included are a copy of the conference program, an introduction by Paul A. Olson, conference papers accompanied by…

  13. Avionics Simulation, Development and Software Engineering

    NASA Technical Reports Server (NTRS)

    2002-01-01

    During this reporting period, all technical responsibilities were accomplished as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14), the MSFC EXPRESS Project Office (FD31), and the Huntsville Boeing Company. Accomplishments included: performing special tasks; supporting Software Review Board (SRB), Avionics Test Bed (ATB), and EXPRESS Software Control Panel (ESCP) activities; participating in technical meetings; and coordinating issues between the Boeing Company and the MSFC Project Office.

  14. Installation Restoration Program. Phase 2. Confirmation/Quantification Stage 1. US Air Force Plant Number 42, Palmdale, California. Volume 1

    DTIC Science & Technology

    1987-02-20

    Bacteriology; 8 years professional experience; served as Project Health and Safety Officer. 1-37 o Duane R. Boline - Ph.D. in Analytical Chemistry ; M.S. in... Chemistry ; B.S.E. in Physical Science; 18 years professional experience; served as Project Quality Assurance Officer. Complete biographical data...University, 1962 M.S., Chemistry , Einporia State University 1965 Ph.D., Analytical Chemistry , Kansas State University, 1975

  15. Heritage plaza parking lots improvement project- Solar PV installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hooks, Todd

    The Agua Caliente Band of Cahuilla Indians (ACBCI or the “Tribe”) installed a 79.95 kW solar photovoltaic (PV) system to offset the energy usage costs of the Tribal Education and Family Services offices located at the Tribe's Heritage Plaza office building, 90I Tahquitz Way, Palm Springs, CA, 92262 (the "Project"). The installation of the Solar PV system was part of the larger Heritage Plaza Parking Lot Improvements Project and mounted on the two southern carport shade structures. The solar PV system will offset 99% of the approximately 115,000 kWh in electricity delivered annually by Southern California Edison (SCE) to themore » Tribal Education and Family Services offices at Heritage Plaza, reducing their annual energy costs from approximately $22,000 annually to approximately $200. The total cost of the proposed solar PV system is $240,000.« less

  16. Recruiting physicians for office-based research.

    PubMed

    Levinson, W; Dull, V T; Roter, D L; Chaumeton, N; Frankel, R M

    1998-06-01

    Research conducted in community outpatient offices can provide insight into the common experiences of patients and physicians. However, recruiting physicians to participate in office-based research is challenging and few descriptions of methods that have been used to successfully recruit random samples of physicians are available. This article describes recruitment strategies utilized in a project that achieved high rates of participation from community-based primary care physicians and surgeons. Recruitment methods included the use of advisory boards to identify potential barriers to participation, use of respected members of the medical community as recruiters, and obtaining endorsements from physician organizations and prominent members of the medical community. Overall, 81% of physicians contacted from a sample frame agreed to participate in the project. Participating physicians most frequently reported that they participated because the project could provide them with feedback about their interviewing style. The recruitment methods described here can be generalized to other types of investigations.

  17. 50 CFR 13.5 - Information collection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer, MS-222 ARLSQ, U.S. Fish and Wildlife Service, Washington, DC 20240, or the Office of Management and Budget, Paperwork Reduction Project (1018-0092), Washington, DC 20603. [63 FR 52634, Oct. 1, 1998] ...

  18. 50 CFR 15.4 - Information collection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Collection Control Officer, MS-222 ARLSQ, U.S. Fish and Wildlife Service, Washington, DC 20240, or the Office of Management and Budget, Paperwork Reduction Project (1018-0093), Washington, DC 20603. [63 FR 52634...

  19. 50 CFR 17.9 - Permit applications and information collection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Information Collection Control Officer, MS-222 ARLSQ, U.S. Fish and Wildlife Service, Washington, DC 20240, or the Office of Management and Budget, Paperwork Reduction Project (1018-0093/0094), Washington, DC...

  20. 24 CFR 401.420 - When must the Restructuring Plan require project-based assistance?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND...

Top