Sample records for kc hydro llc

  1. 78 FR 77118 - KC Small Hydro, LLC; Notice of Amended Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ..., Motions To Intervene, and Competing Applications On May 28, 2013, KC Scoby Hydro, LLC, filed an... 28, 2013, application and sent an acceptance letter to KC Scoby Hydro, LLC. Subsequently, On October 28, 2013, KC Scoby Hydro, LLC, amended its preliminary permit application to change its name to KC...

  2. 75 FR 11527 - KC Hydro LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13617-000] KC Hydro LLC..., 2010. On November 6, 2009, KC Hydro LLC filed an application for a preliminary permit, pursuant to... Sackheim, KC Hydro LLC, 5096 Cocoa Palm Way, Fair Oaks, CA 95628, phone: (916) 962-2271, e-mail: oregon...

  3. 76 FR 71960 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14247-000] KC Hydro LLC of..., Motions To Intervene, and Competing Applications On August 8, 2011, KC Hydro LLC of New Hampshire filed an... spillway elevation of 130 feet mean sea level (msl); (3) connecting new electrical [[Page 71961...

  4. 78 FR 54643 - KC Scoby Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On May 28, 2013, KC Scoby Hydro, LLC, filed an application for a... file a license application during the permit term. A preliminary permit does not authorize the permit...

  5. 76 FR 71961 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14246-000] KC Hydro LLC of... equipment with total hydraulic capacity of 246 cubic feet per second (cfs) and total installed generating...-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory...

  6. 75 FR 17706 - FPL Energy Maine Hydro LLC, Complainant v. Great Lakes Hydro America LLC Rumford Falls Hydro LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-53-000] FPL Energy Maine Hydro LLC, Complainant v. Great Lakes Hydro America LLC Rumford Falls Hydro LLC, Respondents; Notice of Complaint March 29, 2010. Take notice that on March 26, 2010, pursuant to section 206 of the Federal Energy Regulatory Commission's (Commission...

  7. 76 FR 67167 - Riverbank Hydro No. 1 LLC; Qualified Hydro 20 LLC; Lock Hydro Friends Fund XXXVII; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14131-000; 14135-000; 14138-000] Riverbank Hydro No. 1 LLC; Qualified Hydro 20 LLC; Lock Hydro Friends Fund XXXVII; Notice of... LLC (Qualified Hydro) and Lock Hydro Friends Fund XXXVI (Lock Hydro) filed preliminary permit...

  8. 76 FR 74779 - SV Hydro LLC; Coffeeville LLC; FFP Project 99 LLC; Lock Hydro Friends Fund XIV; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14298-000; 14299-000; 14301-000; 14302-000] SV Hydro LLC; Coffeeville LLC; FFP Project 99 LLC; Lock Hydro Friends Fund XIV... (Coffeeville), FFP Project 99 LLC (FFP 99), and Lock Hydro Friends Fund XIV (Lock Hydro) filed preliminary...

  9. 77 FR 11530 - Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000, 14137-000, 14134-000] Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice.... 2, LLC for Project No. 14130-000, Lock+ Hydro Friends Fund XXXVI for Project No. 14137-000, and...

  10. 76 FR 6612 - Lock+ Hydro Friends Fund XL; FFP Missouri 4, LLC; Allegheny 4 Hydro, LLC; Three Rivers Hydro, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13746-000; Project No. 13750-000; Project No. 13776-000; Project No. 13782-000] Lock+ Hydro Friends Fund XL; FFP Missouri 4..., LLC--Project No. 13750-000 3. Allegheny 4 Hydro, LLC--Project No. 13776-000 4. Lock+ Hydro Friends...

  11. RA Construction KC, LLC Information Sheet

    EPA Pesticide Factsheets

    RA Construction KC, LLC (the Company) is located in Gladstone, Missouri. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Kansas City, Missouri.

  12. 77 FR 13317 - Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000, 14137-000, 14134-000] Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice... drawing, the order of priority is as follows: 1. Lock+ Hydro Friends Fund XXXVI: Project No. 14137-000. 2...

  13. 77 FR 12280 - Riverbank Hydro No. 1, LLC, Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14131-000, 14138-00, 14135-000] Riverbank Hydro No. 1, LLC, Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice..., the order of priority is as follows: 1. Lock+ Hydro Friends Fund XXXVII, Project No. 14138-000. 2...

  14. 77 FR 9230 - Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14131-000; Project No. 14138-000; Project No. 14135-000] Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII; Qualified... Hydro No. 1, LLC for Project No. 14131-000, Lock+ Hydro Friends Fund XXXVII for Project No. 14138- 000...

  15. 76 FR 73612 - Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC; Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000; 14268-000; 14277-000; 14281-000] Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC... Friends Fund XVIII (Lock Hydro), Upper Hydroelectric LLC (Upper Hydro), Riverbank Hydro No. 25 LLC...

  16. 76 FR 67171 - Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund XLIII; FFP Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14163-000; 14174-000; 14181-000; 14195-000] Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund... LLC (Solia), and Riverbank Hydro No. 20 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  17. 76 FR 4892 - Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three Rivers Hydro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13740-000, 13749-000, 13775-000, 13781-000] Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three..., Pennsylvania.\\1\\ The applications were filed by Lock+ Hydro Friends Fund XXXIX, for Project No. 13740-000, FFP...

  18. 76 FR 67169 - Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI FFP Project 54...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14162-000; 14173-000; 14182-000; 14192-000] Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI... LLC (Solia), and Riverbank Hydro No. 17 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  19. 76 FR 67174 - Solia 2 Hydroelectric LLC; Riverbank Hydro No. 7 LLC; Lock Hydro Friends Fund XXXVIII Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14157-000; 14161-000; 14184-000] Solia 2 Hydroelectric LLC; Riverbank Hydro No. 7 LLC; Lock Hydro Friends Fund XXXVIII Notice.... 7 LLC (Riverbank) and on May 3, 2011, Lock Hydro Friends Fund XXXVIII (Lock Hydro) filed preliminary...

  20. 77 FR 13316 - FFP Project 91, LLC, Riverbank Hydro No. 23, LLC, Lock+ Hydro Friends Fund III; Notice Announcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14275-000, 14279-000, 14282-000] FFP Project 91, LLC, Riverbank Hydro No. 23, LLC, Lock+ Hydro Friends Fund III; Notice.... 2. Riverbank Hydro No. 23, LLC: Project No. 14279-000. 3. Lock+ Hydro Friends Fund III: Project No...

  1. 76 FR 67176 - Riverbank Hydro No. 13 LLC, Lock Hydro Friends Fund XXXIV, FFP Project 55 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14168-000, 14187-000 and 14199-000] Riverbank Hydro No. 13 LLC, Lock Hydro Friends Fund XXXIV, FFP Project 55 LLC; Notice of..., Lock Hydro Friends Fund XXXIV (Lock Hydro), and FFP Project 55 LLC (FFP 55) filed preliminary permit...

  2. 76 FR 67168 - Riverbank Hydro No. 19 LLC; Lock Hydro Friends Fund XXXIV; FFP Project 59 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14176-000, 14188-000, 14200-000] Riverbank Hydro No. 19 LLC; Lock Hydro Friends Fund XXXIV; FFP Project 59 LLC; Notice of..., Lock Hydro Friends Fund XXXIV (Lock Hydro), and FFP Project 59 LLC (FFP 59) filed preliminary permit...

  3. 77 FR 13317 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC.... Lock+ Hydro Friends Fund XVIII: Project No. 14261-000. 2. Riverbank Hydro No. 25, LLC: Project No...

  4. 77 FR 10741 - Lock+ Hydro Friends Fund XII, BOST2, LLC, Riverbank Hydro No. 21, LLC, FFP Project 96, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14260-000, 14264-000, 14267-000, 14273-000] Lock+ Hydro Friends Fund XII, BOST2, LLC, Riverbank Hydro No. 21, LLC, FFP Project... Greene and Hale counties, Alabama. The applications were filed by Lock+ Hydro Friends Fund XII for...

  5. 76 FR 73615 - FFP Project 91 LLC; Riverbank Hydro No. 23 LLC; Lock Hydro Friends Fund III; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14275-000; 14279-000; 14282-000] FFP Project 91 LLC; Riverbank Hydro No. 23 LLC; Lock Hydro Friends Fund III; Notice of... LLC (Riverbank), and Lock Hydro Friends Fund III (Lock Hydro), filed preliminary permit applications...

  6. 76 FR 67172 - Riverbank Hydro No. 16 LLC, Lock Hydro Friends Fund IV, FFP Project 55 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14167-000, 14185-000 and 14196-000] Riverbank Hydro No. 16 LLC, Lock Hydro Friends Fund IV, FFP Project 55 LLC; Notice of..., Lock Hydro Friends Fund IV (Lock Hydro), and FFP Project 55 LLC (FFP 55) filed preliminary permit...

  7. 76 FR 67169 - Riverbank Hydro No. 10 LLC Lock Hydro Friends Fund XL FFP Project 56 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14164-000; 14189-000; 14198-000] Riverbank Hydro No. 10 LLC Lock Hydro Friends Fund XL FFP Project 56 LLC; Notice of Competing... Hydro Friends Fund XL (Lock Hydro), and FFP Project 56 LLC (FFP 56) filed preliminary permit...

  8. 76 FR 67167 - Riverbank Hydro No. 6 LLC, Lock Hydro Friends Fund XLVII, FFP Project 52 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14172-000, 14178-000 and 14190-000] Riverbank Hydro No. 6 LLC, Lock Hydro Friends Fund XLVII, FFP Project 52 LLC; Notice of..., Lock Hydro Friends Fund XLVII (Lock Hydro), and FFP Project 52 LLC (FFP 52) filed preliminary permit...

  9. 76 FR 67172 - Riverbank Hydro No. 8 LLC Lock Hydro Friends Fund XLIV FFP Project 51 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [14160-000; 14179-000; 14194-000] Riverbank Hydro No. 8 LLC Lock Hydro Friends Fund XLIV FFP Project 51 LLC; Notice of Competing Preliminary... Applications On May 2, 2011, Riverbank Hydro No. 8 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  10. 77 FR 50682 - KC Scoby Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14423-000] KC Scoby Hydro... concrete gravity dam with a 183-foot-long spillway; (2) an existing impoundment having a surface area of 22 acres and a storage capacity of 52 acre-feet at an elevation of 1,080 feet mean sea level (msl); (3) a...

  11. 76 FR 73614 - Lock Hydro Friends Fund XII; BOST2 LLC; Riverbank Hydro No. 21 LLC; FFP Project 96 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14260-000; 14264-000; 14267-000; 14273-000] Lock Hydro Friends Fund XII; BOST2 LLC; Riverbank Hydro No. 21 LLC; FFP Project 96..., Motions To Intervene, and Competing Applications On September 1, 2011, Lock Hydro Friends Fund XII (Lock...

  12. 77 FR 10740 - Lock+ Hydro Friends Fund VIII, FFP Project 92, LLC, Riverbank Hydro No. 24, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14262-000, 14276-000, 14280-000] Lock+ Hydro Friends Fund VIII, FFP Project 92, LLC, Riverbank Hydro No. 24, LLC; Notice... Counties, Kentucky. The applications were filed by Lock+ Hydro Friends Fund VIII for Project No. 14262-000...

  13. 76 FR 67177 - Riverbank Hydro No. 18 LLC, Lock Hydro Friends Fund XXXV, FFP Project 57 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ...-000] Riverbank Hydro No. 18 LLC, Lock Hydro Friends Fund XXXV, FFP Project 57 LLC; Notice of Competing... Competing Applications On May 2, 2011, Riverbank Hydro No. 18 LLC (Riverbank), and on May 3, 2011, Lock... notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments...

  14. 77 FR 13592 - AER NY-Gen, LLC; Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, Eagle Creek Land...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ...; Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, Eagle Creek Land Resources, LLC; Notice... 24, 2012, AER NY-Gen, LLC (transferor), Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources.... Cherry, Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, and Eagle Creek Land Resources...

  15. 76 FR 73616 - Lock Hydro Friends Fund VIII, FFP Project 92 LLC, Riverbank Hydro No. 24 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14262-000; 14276-000; 14280-000] Lock Hydro Friends Fund VIII, FFP Project 92 LLC, Riverbank Hydro No. 24 LLC; Notice of..., and Competing Applications On September 1, 2011, Lock Hydro Friends Fund VIII (Lock Hydro), FFP...

  16. 77 FR 13318 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14298-000, 14299-000, 14301-000] SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Filing Priority for... follows: 1. FFP Project 99, LLC: Project No. 14301-000. 2. SV Hydro, LLC: Project No. 14298-000. 3...

  17. 77 FR 10740 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC...-Tombigbee Waterway in Lowndes County, Mississippi. The applications were filed by Lock+ Hydro Friends Fund...

  18. 75 FR 27332 - AER NY-Gen, LLC; Eagle Creek Hydro Power, LLC; Eagle Creek Water Resources, LLC; Eagle Creek Land...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... 9690-106] AER NY-Gen, LLC; Eagle Creek Hydro Power, LLC; Eagle Creek Water Resources, LLC; Eagle Creek... Power, LLC, Eagle Creek Water Resources, LLC, and Eagle Creek Land Resources, LLC (transferees) filed an.... Paul Ho, Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, and Eagle Creek Land Resources...

  19. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented on September 4, 2013, Hydro-WM, LLC informed the Commission that the exemption from licensing for the...

  20. 76 FR 67174 - Arkansas Electric Cooperative Corp., Riverbank Hydro No. 9 LLC, Solia 3 Hydroelectric LLC, Lock...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Hydroelectric LLC, Lock Hydro Friends Fund XLV, FFP Project 2 LLC; Notice of Competing Preliminary Permit... (Riverbank) and Solia 3 Hydroelectric LLC (Solia) and on May 3, 2011, Lock Hydro Friends Fund XLV (Lock Hydro...

  1. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    .... 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary... Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit applications... regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund XXX, LLC's application is for a...

  2. 77 FR 25715 - Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No., 13010-002; Project No., 14272-000] Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for.... Mississippi 8 Hydro, LLC--Project No. 13010-002. 2. FFP Project 98, LLC--Project No. 14272-000. Dated: April...

  3. 75 FR 73064 - Lock Hydro Friends Fund XLI; Allegheny 7 Hydro, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    .... 13777-000] Lock Hydro Friends Fund XLI; Allegheny 7 Hydro, LLC; Notice of Competing Preliminary Permit..., 2010, Lock Hydro Friends Fund XLI, and Allegheny 7 Hydro, LLC filed applications, pursuant to section 4.... 7 Projects Lock Hydro Friends Fund XLI's project (Project No. 13736-000) would consist of: (1) Two...

  4. 76 FR 4893 - FFP Missouri 13, LLC, Grays Hydro, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13763-000; Project No. 13772-000] FFP Missouri 13, LLC, Grays Hydro, LLC; Notice Announcing Preliminary Permit Drawing January... No. 13763-000, and Grays Hydro, LLC, for Project No. 13772-000. \\1\\ The Commission is open each day...

  5. 77 FR 10740 - Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14269-000; 14270-000] Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing The... Riverbank Hydro No. 22, LLC for Project No. 14269-000, and FFP Project 93, LLC for Project No. 14270-000. \\1...

  6. 76 FR 67170 - Riverbank Hydro No. 12 LLC; Lock Hydro Friends Fund XXXVI; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14175-000; 14183-000] Riverbank Hydro No. 12 LLC; Lock Hydro Friends Fund XXXVI; Notice of Competing Preliminary Permit... May 2, 2011, Riverbank Hydro No. 12 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund XXXVI...

  7. 76 FR 67720 - Lock+ Hydro Friends Fund XXXV; Riverbank Hydro No. 4, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14136-000; Project No. 14139-000] Lock+ Hydro Friends Fund XXXV; Riverbank Hydro No. 4, LLC; Notice Announcing Filing Priority... follows: 1. Lock+ Hydro Friends Fund XXXV--Project No. 14136-000 2. Riverbank Hydro No. 4, LLC--Project No...

  8. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625-003; Project No. 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit... and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for...

  9. 77 FR 77070 - Black Bear Hydro Partners, LLC;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2727-086] Black Bear Hydro...: October 24, 2012. d. Submitted By: Black Bear Hydro Partners, LLC (Black Bear Hydro). e. Name of Project... designating Black Bear Hydro as the Commission's non-federal representative for carrying out informal...

  10. 76 FR 6612 - Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4 Hydroelectric, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13745-000; Project No. 13758-000; Project No. 13767-000] Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4... Hydroelectric, LLC--Project No. 13767-000 2. FFP Missouri 14, LLC--Project No. 13758-000 3. Lock Hydro Friends...

  11. 77 FR 10739 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14298-000, Project No. 14299-000, Project No. 14301-000] SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice... Project No. 14299-000, and FFP Project 99, LLC for Project No. 14301-000.\\2\\ \\1\\ Under the Commission's...

  12. 75 FR 16091 - Glen Falls Hydro, LLC; Essex Energy Partners, LLC; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11143-020] Glen Falls Hydro, LLC; Essex Energy Partners, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene March 24, 2010. On March 8, 2010, Glen Falls Hydro, LLC (transferor) and Essex Energy Partners, LLC (transferee) filed...

  13. 77 FR 55468 - Oliver Hydro LLC; Notice Soliciting Scoping Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13005-003] Oliver Hydro LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been... License. b. Project No.: P-13005-003. c. Date filed: December 14, 2011. d. Applicant: Oliver Hydro LLC. e...

  14. 75 FR 48664 - Turnbull Hydro, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12597-021; Project No. 12598-019] Turnbull Hydro, LLC; Notice of Availability of Environmental Assessment August 4, 2010. In... Register [FR] 47897), the Office of Energy Projects has reviewed Turnbull Hydro, LLC's (Turnbull Hydro's...

  15. 77 FR 55466 - Barren River Lake Hydro LLC; Notice Soliciting Scoping Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13022-003] Barren River Lake Hydro LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric..., 2012. d. Applicant: Barren River Lake Hydro LLC (Barren River Hydro). e. Name of Project: Barren River...

  16. 76 FR 24471 - Qualified Hydro 26, LLC; Lock+ Hydro Friends Fund VII; Western Minnesota Municipal Power Agency...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ...; 14113-000] Qualified Hydro 26, LLC; Lock+ Hydro Friends Fund VII; Western Minnesota Municipal Power... Hydro), Lock+ Hydro Friends Fund VII (Hydro Friends) and Western Minnesota Municipal Power Agency (WMMPA... 02114; (978) 283-2822. Hydro Friends' proposed Lock and Dam 11 Hydropower Project No. 14112 would...

  17. 75 FR 62530 - Eagle Creek Hydro Power, LLC; Laredo Ridge Wind, LLC; RRI Energy West, Inc.; Goshen Phase II LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ...; EG10-52-000; EG10-53-000; EG10- 54-000; EG10-55-000; EG10-56-000] Eagle Creek Hydro Power, LLC; Laredo Ridge Wind, LLC; RRI Energy West, Inc.; Goshen Phase II LLC; Solar Partners I, LLC; Solar Partners II, LLC; Solar Partners VIII, LLC; Notice of Effectiveness of Exempt Wholesale Generator Status October 1...

  18. 78 FR 35624 - Shelbyville Hydro LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13011-003] Shelbyville Hydro LLC; Notice of Availability of Environmental Assessment In accordance with the National... of Energy Projects has reviewed Shelbyville Hydro LLC's application for an original license for the...

  19. 78 FR 2985 - Moretown Hydro Energy Company; Ampersand Moretown Hydro, LLC; Notice of Application for Transfer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5944-021] Moretown Hydro Energy Company; Ampersand Moretown Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On September 25, 2012, Moretown Hydro Energy Company (transferor...

  20. 77 FR 37035 - Goose River Hydro, Inc.; Independence Hydro, LLC; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2804-027] Goose River Hydro, Inc.; Independence Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions to Intervene On June 6, 2012, Goose River Hydro, Inc. (transferor) and Independence Hydro...

  1. 76 FR 67175 - Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000; 14137-000; 14149-000] Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp... Lock Hydro Friends Fund XXXVI (Lock Hydro) and on April 11, 2011, Arkansas Electric Cooperative Corp...

  2. 78 FR 12304 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...+ Hydro Friends Fund XLII, LLC. e. Name of Project: Braddock Locks and Dam Hydroelectric Project. f...\\ Hydro Friends Fund XLII, LLC, c/o Hydro Green Energy, LLC, 900 Oakmont Lane, Suite 310, Westmont, IL...

  3. 78 FR 938 - Burton Creek Hydro Inc., Sollos Energy, LLC'

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... Hydro Inc., Sollos Energy, LLC' Notice of Transfer of Exemption 1. By letter filed December 19, 2012, Burton Creek Hydro Inc. informed the Commission that its exemption from licensing for the Burton Creek Hydro Project, FERC No. 7577, originally issued September 25, 1985,\\1\\ has been transferred to Sollos...

  4. 76 FR 65720 - Lock+ Hydro Friends Fund XXXV, Riverbank Hydro No. 4, LLC; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14136-000; Project No. 14139-000] Lock+ Hydro Friends Fund XXXV, Riverbank Hydro No. 4, LLC; Notice Announcing Preliminary... County, Wisconsin.\\1\\ The applications were filed by Lock+ Hydro Friends Fund XXXV for Project No. 14136...

  5. 77 FR 9916 - Riverbank Hydro No. 2, LLC; Lock+ Hydro Friends Fund XXXVI; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000; 14137-000] Riverbank Hydro No. 2, LLC; Lock+ Hydro Friends Fund XXXVI; Notice Announcing Preliminary Permit Drawing The...+ Hydro Friends Fund XXXVI for Project No. 14137-000. \\1\\ Under the Commission's Rules of Practice and...

  6. 76 FR 42124 - River Bounty, Inc.; Renew Hydro, LLC; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ....; Renew Hydro, LLC; Notice of Transfer of Exemption 1. By letters filed April 19, April 20, and May 4... Hydroelectric Project No. 5730, originally issued June 9, 1982,\\1\\ has been transferred to Renew Hydro, LLC. The... exemption does not require Commission approval. \\1\\ American Hydro Power Co., 19 FERC ] 62,426 (1982). 2...

  7. 76 FR 41236 - FPL Energy Maine Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ... Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments Take notice that the....: 2283-064. c. Date Filed: March 25, 2011. d. Applicant: FPL Energy Maine Hydro, LLC. e. Name of Project... Land/Trail Management Plan issued March 25, 2010, FPL Energy Maine Hydro, LLC (licensee) filed an...

  8. 77 FR 67359 - Wickiup Hydro Group, LLC, Oregon; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12965-002] Wickiup Hydro Group, LLC, Oregon; Notice of Availability of Environmental Assessment In accordance with the National... Projects has reviewed Wickiup Hydro Group, LLC's application for an original license for the Wickiup Dam...

  9. 77 FR 25999 - Wickiup Hydro Group, LLC; Oregon; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12965-002] Wickiup Hydro Group, LLC; Oregon; Notice of Availability of Environmental Assessment In accordance with the National... Projects has reviewed Wickiup Hydro Group, LLC's application for an original license for the Wickiup Dam...

  10. 75 FR 18191 - City of Raleigh; Community Hydro, LLC; Notice of Competing Preliminary Permit Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ...: Mr. Thomas A. McCormick, Raleigh City Attorney, P.O. Box 590, Raleigh, North Carolina 27601, e-mail tom.mccormick@ci.raleigh.nc.us . For Community Hydro, LLC: Lori Barg, Community Hydro, LLC, 113...

  11. 75 FR 61463 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 15, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ...+ Hydro Friends Fund XLIX; FFP Missouri 15, LLC; Notice of Competing Preliminary Permit Applications..., 2010. On July 12, 2010, Lock+ Hydro Friends Fund XLVIII (Hydro Friends) and FFP Missouri 15, LLC (FFP... without the owners' express permission. Hydro Friends' proposed Lock and Dam 14 Hydropower Project...

  12. 77 FR 68765 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Scoping Meetings and Environmental Site Review and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... Friends Fund XLII, LLC; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping.... c. Date filed: September 17, 2012. d. Applicant: Lock+ Hydro Friends Fund XLII, LLC. e. Name of...)-825(r). h. Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XLII, LLC, c/o Hydro...

  13. 75 FR 49925 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    .... 13813-000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice of Competing Preliminary Permit... August 9, 2010. Lock+ Hydro Friends Fund XLIX (Hydro Friends) and FFP Missouri 14, LLC (FFP) filed...-station located south-west of the dam. Hydro Friends is also exploring alternatives that would locate the...

  14. 77 FR 13317 - Lock+ Hydro Friends Fund XII, BOST2, LLC, et al.; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... al.] Lock+ Hydro Friends Fund XII, BOST2, LLC, et al.; Notice Announcing Filing Priority for Preliminary Permit Applications Project No. Lock+ Hydro Friends Fund XII 14260-000 BOST2, LLC 14264-000.... 2. BOST2, LLC: Project No. 14264-000. 3. Lock+ Hydro Friends Fund XII: Project No. 14260-000. 4...

  15. 75 FR 11150 - Free Flow Power Qualified Hydro 23, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Qualified Hydro 23, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Power Qualified Hydro 23, LLC (FFP Qualified Hydro 23) filed an application for a preliminary permit... new 2.6-mile- long, 23-kilovolt transmission line; and (5) appurtenant facilities. The proposed...

  16. 78 FR 62350 - FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13579-002; Project No. 14491-000] FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing... applications were filed by FFP Qualified Hydro 14, LLC for Project No. 13579-002 and Western Minnesota...

  17. 77 FR 55212 - North Star Hydro Services CA, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14379-000] North Star Hydro..., Motions To Intervene, and Competing Applications On March 30, 2012, North Star Hydro Services CA, LLC... approximately 3.8 gigawatthours. Applicant Contact: David Holland, North Star Hydro Services CA, LLC, 1110 West...

  18. 77 FR 55202 - Oliver Hydro LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13005-003] Oliver Hydro LLC... filed: December 14, 2011. d. Applicant: Oliver Hydro LLC. e. Name of Project: William Bacon Oliver Lock... according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate...

  19. 77 FR 29630 - Qualified Hydro 24, LLC; Notice of Scoping Meetings and Environmental Site Review and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13843-001] Qualified Hydro... No.: 13843-001. c. Date filed: January 3, 2012. d. Applicant: Qualified Hydro 24, LLC. [[Page 29631...: Ramya Swaminathan, Qualified Hydro 24, LLC, 239 Causeway Street, Suite 300, Boston, MA 02114; (978) 283...

  20. 77 FR 23241 - Lock+ Hydro Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 20, 2012. d. Submitted By: Lock+ Hydro Friends Fund XXX, LLC. e. Name of Project... Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XXX, c/o Hydro Green Energy, LLC, 900...

  1. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a...

  2. 77 FR 67352 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... Friends Fund XLII, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and... No.: 13739-002 c. Date filed: September 17, 2012 d. Applicant: Lock+ Hydro Friends Fund XLII, LLC e... USC 791(a)-825(r). h. Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XLII, LLC, c...

  3. 75 FR 65312 - Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13831-000] Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments and Interventions October 15, 2010. On August 9, 2010, Vortex Hydro Energy, LLC filed an...

  4. 75 FR 12229 - Sweetwater Hydro, LLC and Ute Mountain Ute Tribe; Notice of Preliminary Permit Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13615-000] Sweetwater Hydro, LLC and Ute Mountain Ute Tribe; Notice of Preliminary Permit Application Accepted for Filing and..., Sweetwater Hydro, LLC and Ute Mountain Ute Tribe filed an application for a preliminary permit, pursuant to...

  5. 75 FR 47808 - Verde Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13819-000] Verde Hydro, LLC... Intervene, and Competing Applications August 2, 2010. On July 21, 2010, Verde Hydro, LLC filed an... the feasibility of the Verde Hydroelectric Project, located in Maricopa County, in the State of...

  6. 78 FR 72879 - Western Minnesota Municipal Power Agency; Lock+ Hydro Friends Fund III, LLC; Notice Announcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14540-000; Project No. 14539-000] Western Minnesota Municipal Power Agency; Lock+ Hydro Friends Fund III, LLC; Notice.... 14540-000 2. Lock+ Hydro Friends Fund III, LLC Project No. 14539-000 Dated: November 26, 2013. Nathaniel...

  7. 78 FR 22873 - Hamilton Street Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 19, 2013, Hamilton Street Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA...

  8. 78 FR 22872 - Hamilton Street Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 19, 2013, Hamilton Street Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA...

  9. 78 FR 71602 - Lock 12 Hydro Partners, LLC; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... Hydroelectric Project] Lock 12 Hydro Partners, LLC; Notice of Proposed Restricted Service List for a... Hydro Partners, LLC, as the applicant for Project No. 13214-003, is invited to participate in... Kinloch, Lock 14 Hydro Partners, 414 South Wenzel St., Louisville, KY 40204. Any person on the official...

  10. 78 FR 62324 - Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-16

    ... Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 25, 2013, Mid-Atlantic Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  11. 78 FR 60271 - Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 16, 2013, Mid-Atlantic Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  12. 78 FR 69081 - Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 9, 2013, Mid-Atlantic Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  13. 78 FR 28838 - Hamilton Street Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 26, 2013, Hamilton Street Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  14. 78 FR 26768 - Great Lakes Hydro America, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2520-072] Great Lakes Hydro...: March 1, 2013. d. Submitted By: Great Lakes Hydro America, LLC. e. Name of Project: Mattaceunk... Preservation at 36 CFR 800.2. l. With this notice, we are designating Great Lakes Hydro America, LLC as the...

  15. 78 FR 71603 - Lock 14 Hydro Partners, LLC; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... Heidelberg Hydroelectric Project] Lock 14 Hydro Partners, LLC; Notice of Proposed Restricted Service List for... listed below. Lock 14 Hydro Partners, LLC, as the applicant for Project No. 13213-003, is invited to... Kinloch, Lock 14 Hydro Partners, 414 South Wenzel St., Louisville, KY 40204. Any person on the official...

  16. 77 FR 60971 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Friends Fund XLII, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting... No.: 13739-002. c. Date filed: September 17, 2012. d. Applicant: Lock+ Hydro Friends Fund XLII, LLC.... 791 (a)-825(r). h. Applicant Contact: Mr. Mark R. Stover, Lock+ TM Hydro Friends Fund XLII, c/o Hydro...

  17. 76 FR 71960 - KC Hydo LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14244-000] KC Hydo LLC of... electrical generating equipment with total hydraulic capacity of 160 cubic feet per second (cfs) and total... D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC...

  18. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    .... Topsham Hydro Partners Limited Partnership: Christine M. Miller, Brown Bear GP, LLC, c/o ArcLight Capital.... Miller, Brown Bear Power, LLC, c/o ArcLight Capital Partners, LLC, 200 Clarendon Street, 55th Floor.... Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426...

  19. 77 FR 60419 - Lock + Hydro Friends Fund XIX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Friends Fund XIX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: August 7, 2012. d. Submitted By: Lock + Hydro Friends Fund XIX, LLC. e. Name of Project.... Lock + Hydro Friends Fund XIX, LLC filed its request to use the Traditional Licensing Process on August...

  20. 77 FR 35371 - Qualified Hydro 24, LLC; Notice of Cancellation of Scoping Meetings and Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13843-001] Qualified Hydro 24, LLC; Notice of Cancellation of Scoping Meetings and Environmental Site Review Take notice that Qualified Hydro 24, LLC, filed a request on June 4, 2012, to surrender the preliminary permit for the...

  1. 77 FR 9230 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14181-000; 14195-000] Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing The... applications were filed by Lock+ Hydro Friends Fund XLIII for Project No. 14181-000, and FFP Project 53, LLC...

  2. 77 FR 12280 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189-000, 14198-000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XL, Project No. 14189-000. 2. FFP Project 56, LLC, Project No. 14198-000. Dated...

  3. 77 FR 12281 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14181-000; Project No. 14195-000] Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XLIII, Project No. 14181-000. 2. FFP Project 53, LLC, Project No...

  4. 78 FR 59926 - Lock+ Hydro Friends Fund XIX, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Friends Fund XIX, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On April 2, 2013, Lock+ Hydro Friends Fund XIX... operate as directed by the Corps. Applicant Contact: Mr. Wayne Krouse, Lock+ Hydro Friends Fund, LLC, 4900...

  5. 77 FR 9232 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14184-000; 14191-000] Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing The... filed by Lock+ Hydro Friends Fund XXXVIII for Project No. 14184-000 and FFP Project 1, LLC for Project...

  6. 77 FR 12279 - Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14178-000, 14190-000] Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLVII, Project No. 14178-000. 2. FFP Project 52, LLC, Project No. 14190-000. Dated...

  7. 78 FR 54889 - Lock+ Hydro Friends Fund XIX, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... Friends Fund XIX, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 2, 2013, Lock+ Hydro Friends Fund XIX... operate as directed by the Corps. Applicant Contact: Mr. Wayne Krouse, Lock+ Hydro Friends Fund, LLC, 4900...

  8. 77 FR 12280 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14186-000; Project No. 14197-000] Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC;Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XXXV, Project No. 14186-000. 2. FFP Project 57, LLC, Project No...

  9. 77 FR 12281 - Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14187-000, 14199-000] Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XXXIV, Project No. 14187-000. 2. FFP Project 58, LLC, Project No. 14199-000. Dated...

  10. 77 FR 12279 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14184-000; Project No. 14191-000] Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XXXVIII, Project No. 14184-000. 2. FFP Project 1, LLC, Project No...

  11. 77 FR 12279 - Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14179-000, 14194-000] Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLIV, Project No. 14179-000. 2. FFP Project 51, LLC, Project No. 14194-000. Dated...

  12. 76 FR 66713 - Hydro Green Energy, LLC; Notice of Intent To File License Applications and Approving Use of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ...-001, 13424-001, 13809-001, 13649-001, 13651-001] Hydro Green Energy, LLC; Notice of Intent To File... Intent To File License Applications and Approving Requests to Use the Traditional Licensing Process. b... Filed: August 23, 2011. d. Submitted By: Hydro Green Energy, LLC (Hydro Green). e. Name of Projects...

  13. 77 FR 34371 - Red River Hydro LLC; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13160-004] Red River Hydro... Application: Original Major License. b. Project No.: 13160-004. c. Date Filed: May 24, 2012. d. Applicant: Red River Hydro LLC (Red River), a wholly-owned subsidiary of Symbiotics LLC. e. Name of Project: Overton...

  14. 76 FR 49462 - Red River Hydro LLC; Notice of Application Tendered For Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13160-002] Red River Hydro... Application: New Major License. b. Project No.: 13160-002. c. Date Filed: July 29, 2011. d. Applicant: Red River Hydro LLC (Red River), a wholly-owned subsidiary of Symbiotics LLC. e. Name of Project: Overton...

  15. 77 FR 14775 - Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14180-000, 14193-000] Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLV Project No. 14180-000. 2. FFP Project 2, LLC Project No. 14193-000. Dated: March...

  16. 77 FR 12280 - Lock+ Hydro Friends Fund XLI; FFP Project 54, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14182-000; Project No. 14192-000] Lock+ Hydro Friends Fund XLI; FFP Project 54, LLC; Notice Announcing Filing Priority for... follows: 1. FFP Project 54, LLC, Project No. 14192-000. 2. Lock+ Hydro Friends Fund XLI, Project No. 14182...

  17. 77 FR 9231 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189-000; 14198-000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing The Commission... applications were filed by Lock+ Hydro Friends Fund XL for Project No. 14189-000 and FFP Project 56, LLC for...

  18. 77 FR 9230 - Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14180-000; 14193-000] Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing The Commission... filed by Lock+ Hydro Friends Fund XLV for Project No. 14180-000 and FFP Project 2, LLC for Project No...

  19. 77 FR 12280 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14188-00o, 14200-000] Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Filing Priority for Preliminary Permit.... FFP Project 59, LLC, Project No. 14200-000. 2. Lock+ Hydro Friends Fund XXXVIII, Project No. 14188-000...

  20. 78 FR 32644 - Las Vegas Wash Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On November 16, 2012, Las Vegas Wash Hydro LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  1. 77 FR 9222 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... Friends Fund XLII, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: December 23, 2011. d. Submitted By: Lock+ Hydro Friends Fund XLII, LLC. e. Name of Project... regulations. h. Potential Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XLII, c/o Hydro...

  2. 77 FR 16216 - Lock+ Hydro Friends Fund XLVI, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Friends Fund XLVI, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 7, 2012. d. Submitted By: Lock+ Hydro Friends Fund XLVI, LLC. e. Name of Project... regulations. h. Potential Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XLVI, c/o Hydro...

  3. 77 FR 59608 - Go Green Go Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14427-000] Go Green Go... To Intervene, and Competing Applications On June 20, 2012, Go Green Go Hydro LLC (Go Green or... of 5,000 megawatt-hours. Applicant Contact: Mr. David G. DeMera, Go Green Go Hydro LLC, 18300 Morgan...

  4. 75 FR 352 - FFP Qualified Hydro 18 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... Hydro 18 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydro 18 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal... electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site...

  5. 77 FR 16217 - Lock+ Hydro Friends Fund XXXIX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Friends Fund XXXIX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 7, 2012. d. Submitted by: Lock+ Hydro Friends Fund XXXIX, LLC. e. Name of Project... Commission's regulations. h. Potential Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund...

  6. 78 FR 62359 - Red River Hydro LLC; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13160-004] Red River Hydro... Projects has reviewed Red River Hydro LLC's application for an original license for the Overton Lock and... (EA). The project would be located on the Red River in Rapides Parish, Louisiana, at an existing lock...

  7. 78 FR 36767 - Red River Hydro LLC; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13160-004] Red River Hydro... Projects has reviewed Red River Hydro LLC's application for an original license for the Overton Lock and... assessment (draft EA). The project would be located on the Red River in Rapides Parish, Louisiana, at an...

  8. 75 FR 80487 - Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13809-000; Project No. 13814-000] Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC; Notice Announcing Preliminary Permit..., Illinois.\\1\\ The applications [[Page 80488

  9. 77 FR 55212 - North Star Hydro Services CA, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14399-000] North Star Hydro..., Motions to Intervene, and Competing Applications On March 30, 2012, North Star Hydro Services CA, LLC... output would be approximately 4.6 gigawatthours. Applicant Contact: David Holland, North Star Hydro...

  10. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  11. 76 FR 20658 - Qualified Hydro 25, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... 25, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 30, 2010, Qualified Hydro 25, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  12. 75 FR 45625 - Slatersville Hydro, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13356-000-RI] Slatersville Hydro, LLC; Notice of Availability of Environmental Assessment July 27, 2010. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18...

  13. 77 FR 36531 - Yegua Mesa Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13315-001] Yegua Mesa Hydro... Intervene, and Competing Applications On May 2, 2012, Yegua Mesa Hydro, LLC, filed an application for a... studying the feasibility of the Yegua Mesa Pumped Storage Hydroelectric Project (Yegua Mesa Project or...

  14. 76 FR 35873 - Blue Heron Hydro LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13226-003] Blue Heron Hydro... Major License. b. Project No.: 13226-003. c. Date filed: November 1, 2010. d. Applicant: Blue Heron..., Blue Heron Hydro LLC, 113 Bartlett Road, Plainfield, Vermont 05667. (802) 454-1874. i. FERC Contact: Dr...

  15. 77 FR 12281 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14185-000; Project No. 14196-000] Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit... County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund IV for Project No. 14185-000...

  16. 76 FR 1427 - Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13809-000; Project No. 13814-000] Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC Notice Announcing Filing Priority for... order of priority is as follows: 1. Lock+ Hydro Friends Fund XLVIII........ Project No. 13809-000...

  17. 76 FR 3626 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13808-000; Project No. 13813-000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Preliminary Permit..., near Augusta, Georgia.\\1\\ The applications were filed by Lock+ Hydro Friends Fund XLIX, for Project No...

  18. 77 FR 9230 - Lock+ Hydro Friends Fund XLVII; FFP Project 52, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 14178-000; Project No. 14190-000] Lock+ Hydro Friends Fund XLVII; FFP Project 52, LLC; Notice Announcing Preliminary Permit... County, Arkansas. The applications were filed by Lock+ Hydro Friends Fund XLVII for Project No. 14178-000...

  19. 77 FR 9232 - Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14187-000; Project No. 14199-000] Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Preliminary Permit... County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund XXXIV for Project No. 14187-000...

  20. 77 FR 9231 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14188-000; 14200-000] Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing The.... The applications were filed by Lock+ Hydro Friends Fund XXVIII for Project No. 14188-000 and FFP...

  1. 77 FR 64971 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Waiver, in Part, of Prefiling Consultation Required...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... Friends Fund XLII, LLC; Notice of Waiver, in Part, of Prefiling Consultation Required Under Section 4.38(C... License. b. Project No.: 13739-002. c. Date Filed: September 17, 2012. d. Applicant: Lock+ Hydro Friends.... 791(a)-825(r). h. Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XLII, c/o Hydro...

  2. 77 FR 9232 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14186-000; Project No. 14197-000] Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit.... The applications were filed by Lock+ Hydro Friends Fund XXXV for Project No. 14186-000 and FFP Project...

  3. 77 FR 9231 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185-000; 14196-000] Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing The Commission..., Kentucky. The applications were filed by Lock+ Hydro Friends Fund IV for Project No. 14185-000 and FFP...

  4. 77 FR 9915 - Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14179-000; Project No. 14194-000] Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit.... The applications were filed by Lock+ Hydro Friends Fund XLIV for Project No. 14179-000 and FFP Project...

  5. 76 FR 4648 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13808-000; Project No. 13813-000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Filing Priority for... order of priority is as follows: 1. Lock+ Hydro Friends Fund XLIX: Project No. 13808-000. 2. FFP...

  6. 77 FR 13318 - Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185-000, 14196-000] Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for Preliminary Permit... Friends Fund IV: Project No. 14185-000. 2. FFP Project 55, LLC: Project No. 14196-000. Dated: February 29...

  7. 76 FR 80924 - Blue Heron Hydro LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13226-003; 13368-002] Blue Heron Hydro LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission (Commission) regulations, 18 CFR...

  8. 78 FR 37210 - Parker Knoll Hydro, LLC; Notice of Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13239-002] Parker Knoll Hydro, LLC; Notice of Environmental Site Review Take notice that the following hydroelectric applications have been filed with Commission and are available for public inspection: a. Type of Application: New Major License. b. Project No.: 13239. c. Date...

  9. 77 FR 59607 - Black Canyon Hydro, LLC; Notice of Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14110-001] Black Canyon Hydro, LLC; Notice of Environmental Site Review On Wednesday, October 3, 2012, at 3 p.m., Commission staff will be participating in an environmental site review for the proposed Black Canyon Hydroelectric Project. All interested participants should mee...

  10. 78 FR 44105 - Monroe Hydro, LLC; Notice of Intent to File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14430-000] Monroe Hydro... Application and Request to Use the Traditional Licensing Process. b. Project No.: 14430-000 c. Date Filed: April 2, 2013 d. Submitted By: Monroe Hydro, LLC e. Name of Project: Monroe Drop Hydroelectric Project f...

  11. 76 FR 35209 - FFP Qualified Hydro 14 LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ...: April 4, 2011. d. Submitted by: Free Flow Power Qualified Hydro 14 LLC (Qualified Power 14 LLC), a subsidiary of Free Flow Power Corporation. e. Name of Project: Saylorville Dam Water Power Project. f... County, Iowa. The project would occupy 1.5 acres of United States lands administered by Corps' Rock...

  12. 78 FR 1853 - EH California Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-09

    ... tailrace. Applicant Contact: Mr. John R. Collins, EH California Hydro, LLC, 5425 Wisconsin Avenue, Suite 600, Chevy Chase, Maryland 20815; phone: (301) 718-4433. FERC Contact: Jim Fargo at [email protected

  13. 77 FR 55205 - Barren River Lake Hydro LLC; Notice of Application Accepted for Filing and Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    .... c. Date filed: December 9, 2011, and amended on June 12, 2012. d. Applicant: Barren River Lake Hydro LLC (Barren River Hydro) e. Name of Project: Barren River Lake Dam Hydroelectric Project. f. Location... registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your...

  14. 76 FR 9345 - Soule Hydro, LLC; Notice of Draft License Application and Preliminary Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ...] Soule Hydro, LLC; Notice of Draft License Application and Preliminary Draft Environmental Assessment (PDEA) and Request for Preliminary Terms and Conditions Take notice that the following hydroelectric... Project: With this notice the Commission is soliciting (1) preliminary terms, conditions, and...

  15. 75 FR 6018 - Boyce Hydro Power, LLC; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    .... d. Applicant: Boyce Hydro Power, LLC (BHP). e. Name of Project: Edenville Hydroelectric Project. f... construct the footings and first lift of the retaining walls. BHP states that shutting off the bypass flow...

  16. 78 FR 36768 - Electron Hydro, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-1646-000] Electron Hydro, LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Electron...

  17. 77 FR 51022 - Clark Canyon Hydro, LLC; Notice of Application Accepted for Filing, Ready for Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12429-007] Clark Canyon... b. Project No.: 12429-007. c. Date Filed: May 31, 2012. d. Applicant: Clark Canyon Hydro, LLC . e. Name of Project: Clark Canyon Dam Hydroelectric Project. f. Location: When constructed, the project...

  18. 78 FR 2989 - Monroe Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ...; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 2, 2012, Monroe Hydro LLC filed an application for a... permit holder priority to file a license application during the permit term. A preliminary permit does...

  19. 76 FR 18212 - FPL Energy Maine Hydro LLC; Madison Paper Industries; Merimil Limited Partnership; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2615-037] FPL Energy Maine Hydro LLC; Madison Paper Industries; Merimil Limited Partnership; Notice of Availability of Draft... paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal...

  20. 76 FR 19355 - Oregon Winds Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14109-000] Oregon Winds..., Motions To Intervene, and Competing Applications On March 11, 2011, Oregon Winds Hydro, LLC filed an... study the feasibility of the Oregon Winds Pumped Storage Project to be located on the John Day River...

  1. 78 FR 45523 - Davis Hydro, LLC Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-29

    ... Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 4, 2013, the Davis Hydro, LLC, filed an application for a..., is to grant the permit holder priority to file a license application during the permit term. A...

  2. 77 FR 13317 - Notice Announcing Filing Priority for Preliminary Permit Applications: Lock+ Hydro Friends Fund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... Applications: Lock+ Hydro Friends Fund VIII; FFP Project 92, LLC; Riverbank Hydro No. 24, LLC On February 28.... 14276-000. 2. Riverbank Hydro No. 24, LLC: Project No. 14280-000. 3. Lock+ Hydro Friends Fund VIII...

  3. 77 FR 101 - Rumford Falls Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2333-078] Rumford Falls Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Types...

  4. 75 FR 65311 - Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13815-000] Renew Hydro, LLC... Municipal Utilities Authority's existing 115-foot-high, 2,150-foot-long concrete gravity dam, with 500-foot...; (3) the existing Boonton reservoir with an 825-acre surface area and a 28,200 acre-foot storage area...

  5. 78 FR 43187 - PacifiCorp, St. Anthony Hydro LLC; Notice of Application Accepted for Filing, Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    .... Anthony Hydro LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene...-6779, [email protected] . j. Deadline for filing comments, motions to intervene, and protests, is... of your comments. Please include the project number (P-2381-063) on any comments, motions, or...

  6. 76 FR 37806 - Ashton Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... DEPARTMENT OF ENERGY [Project No. 14213-000] Ashton Hydro, LLC; Notice of Preliminary Permit... lands or waters owned by others without the owners' express permission. The proposed run-of-the-river... level and a maximum storage capacity of about 200 ac-ft; (3) a new intake on the upstream face of the...

  7. 78 FR 17389 - Clark Canyon Hydro, LLC; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12429-009] Clark Canyon...: 12429-009. c. Date Filed: January 28, 2013. d. Applicant: Northwest Power Services on behalf of Clark Canyon Hydro, LLC. e. Name of Project: Clark Canyon Dam Hydroelectric Project. f. Location: The Clark...

  8. 77 FR 2972 - Thunder Bay Power Company, Thunder Bay Power, LLC, et al.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... Hydro, LLC. Dayton Fox River, LaSalle County, IL. P-2347-049 Midwest Hydro, Inc. Midwest Hydro, LLC... FR, Neenah Paper FR, Middle Appleton Dam Lower Fox River, LLC and N.E.W. LLC and N.E.W. Outagamie...

  9. 76 FR 27310 - Janet A. Boyd, Boyd Hydro, LLC; Notice of Application for Transfer of License, and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7269-028] Janet A. Boyd... Intervene On March 25, 2011, Janet A. Boyd (transferor) and Boyd Hydro, LLC (transferee) filed an... Jim Boyd Hydroelectric Project from transferor to transferee. Applicants' Contact: Transferor: Janet A...

  10. 77 FR 99 - Barren River Lake Hydro LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13022-003] Barren River Lake Hydro LLC; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing Procedural Schedule for Licensing and a Deadline for Submission of Final Amendments Take notice that the following...

  11. 77 FR 73654 - Eau Galle Renewable Energy Company, Eau Galle Hydro, LLC; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Renewable Energy Company, Eau Galle Hydro, LLC; Notice of Transfer of Exemption 1. By letter filed October 12, 2012, Eau Galle Renewable Energy Company informed the Commission that its exemption from... transferred to Eau Galle Renewable Energy Company by letter.\\2\\ The project is located on the Eau Galle River...

  12. 75 FR 29335 - Rumford Falls Hydro, LLC; Notice of Application for Amendment of License, and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2333-068] Rumford Falls Hydro, LLC; Notice of Application for Amendment of License, and Soliciting Comments, Motions To Intervene, and Protests May 18, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for publi...

  13. 77 FR 68764 - Parker Knoll Hydro, LLC; Notice of Intent To Prepare An Environmental Impact Statement and Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13239-002] Parker Knoll Hydro, LLC; Notice of Intent To Prepare An Environmental Impact Statement and Notice of Scoping Meetings and Soliciting Scoping Comments Take notice that the following hydroelectric applications have been filed with Commission and are available for...

  14. 77 FR 61585 - FPL Energy Maine Hydro LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... Hydro LLC; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD... Application for a New License and Commencing Pre-filing Process. b. Project No.: 2531-067. c. Dated Filed... Commission a Pre-Application Document (PAD; including a proposed process plan and schedule), pursuant to 18...

  15. 76 FR 79671 - Parker Knoll Hydro, LLC; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... project would be a closed-loop pumped storage system, with an initial fill from the existing Otter Creek...: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Parker Knoll Hydro, LLC., 975 South State... system; (12) approximately 1 mile of 345-kV transmission line; and (13) appurtenant facilities. The...

  16. 78 FR 58301 - Go With the Flow Hydro Power, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14538-000] Go With the Flow..., Motions To Intervene, and Competing Applications On July 22, 2013, Go with the Flow Hydro Power, LLC...), proposing to study the feasibility of the Go with the Flow Hydroelectric Project (project) to be located on...

  17. 77 FR 40354 - Mesa de Los Carros Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13316-001] Mesa de Los..., Motions To Intervene, and Competing Applications On April 3, 2012, Mesa De Los Carros Hydro, LLC filed an... the Mesa De Los Carros Pumped Storage Project to be located in San Miguel County, New Mexico. The...

  18. 77 FR 58371 - Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and U.S. Bank National Association...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3021-088] Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and U.S. Bank National Association Allegheny Hydro, LLC... 31, 2012, Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and U.S. Bank National...

  19. 77 FR 20622 - N.E.W. Hydro LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2744-041; 2744-042] N.E.W....: 2744-041 & 042. c. Date Filed: March 14, 2012. d. Applicant: N.E.W. Hydro LLC. e. Name of Project..., 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Scott Klabunde, P.O. Box 167, 116 N. State Street...

  20. 75 FR 5071 - Mississippi L&D 21, LLC, Mississippi River No. 21 Hydropower Company Lock + TM

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ... Lock + \\TM\\ Hydro Friends Fund XXXII, LLC; Notice of Preliminary Permit Applications Accepted for..., Lock + TM Hydro Friends Fund XXXII, LLC (Lock + Hydro) filed an application for a preliminary permit...

  1. 75 FR 71104 - Lock Hydro Friends Fund XXXV; FFP Missouri 7, LLC; Dashields Hydro, LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    .... 13735-000; Project No. 13756-000; Project No. 13779-000] Lock Hydro Friends Fund XXXV; FFP Missouri 7... Soliciting Comments, and Motions To Intervene November 15, 2010. On May 18, 2010, Lock Hydro Friends Fund.... Descriptions of the proposed Dashields Lock and Dam Projects: Lock Hydro Friends Fund XXXV's project (Project...

  2. KC-46A Tanker Modernization (KC-46A)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-387 KC-46A Tanker Modernization (KC-46A) As of FY 2017 President’s Budget Defense Acquisition...Management Information Retrieval (DAMIR) March 22, 2016 16:45:38 UNCLASSIFIED KC-46A December 2015 SAR March 22, 2016 16:45:38 UNCLASSIFIED 2...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost KC-46A December 2015 SAR March 22

  3. KC-130J Transport Aircraft (KC-130J)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-433 KC-130J Transport Aircraft (KC-130J) As of FY 2017 President’s Budget Defense Acquisition...Management Information Retrieval (DAMIR) March 23, 2016 15:23:28 UNCLASSIFIED KC-130J December 2015 SAR March 23, 2016 15:23:28 UNCLASSIFIED 2...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost KC-130J December 2015 SAR March 23

  4. Lac Courte Oreilles Hydro Dam Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weaver, Jason; Meyers, Amy

    The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

  5. 76 FR 1613 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13877-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications January 4, 2011. On November 4, 2010, Mahoning Hydro, LLC...

  6. KC-135 on ramp

    NASA Technical Reports Server (NTRS)

    1958-01-01

    The Boeing KC-135 Stratotanker, besides being used extensively in its primary role as an inflight aircraft refueler, has assisted in several projects at the NASA Dryden Flight Research Center, Edwards, California. In 1957 and 1958, Dryden was asked by what was then the Civil Aeronautics Administration (later absorbed into the Federal Aviation Administration (FAA) in 1958) to help establish new approach procedure guidelines on cloud-ceiling and visibility minimums for Boeing's first jet airliner, the B-707. Dryden used a KC-135 (the military variant of the 707), seen here on the runway at Edwards Air Force Base, to aid the CAA in these tests. In 1979 and 1980, Dryden was again involved with general aviation research with the KC-135. This time, a special wingtip 'winglet', developed by Richard Whitcomb of Langley Research Center, was tested on the jet aircraft. Winglets are small, nearly vertical fins installed on an airplane's wing tips to help produce a forward thrust in the vortices that typically swirl off the end of the wing, thereby reducing drag. This winglet idea was tested at the Dryden Flight Research Center on a KC-135A tanker loaned to NASA by the Air Force. The research showed that the winglets could increase an aircraft's range by as much as 7 percent at cruise speeds. The first application of NASA's winglet technology in industry was in general aviation business jets, but winglets are now being incorporated into most new commercial and military transport jets, including the Gulfstream III and IV business jets, the Boeing 747-400 and MD-11 airliners, and the C-17 military transport. In the 1980's, a KC-135 was used in support of the Space Shuttle program. Since the Shuttle was to be launched from Florida, researchers wanted to test the effect of rain on the sensitive thermal tiles. Tiles were mounted on special fixtures on an F-104 aircraft and a P-3 Orion. The F-104 was flown in actual rain conditions, and also behind the KC-135 spray tanker as it

  7. KC-135 and Other Microgravity Simulations

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This document represents a summary of medical and scientific evaluations conducted aboard the KC-135 from June 23, 2004 to June 27, 2005. Included is a general overview of KC-135 activities manifested and coordinated by the Human Adaptation and Countermeasures Office. A collection of brief reports that describe tests conducted aboard the KC-135 follows the overview. Principal investigators and test engineers contributed significantly to the content of the report describing their particular experiment or hardware evaluation. This document concludes with an appendix that provides background information concerning the KC-135 and the Reduced-Gravity Program.

  8. 75 FR 75999 - Lock + Hydro Friends Fund XlVI; FFP Missouri 17, LLC; Solia 3 Hydroelectric, LLC; Three Rivers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    .... 13754-000; Project No. 13765-000; Project No. 13783-000; Project No. 13790-000] Lock + Hydro Friends..., and Motions To Intervene NOVEMBER 30, 2010. On May 18, 2010, Lock + Hydro Friends Fund XLVI, FFP... proposed Hildebrand Lock & Dam Projects: Lock+ Hydro Friends Fund XLVI's project (Project No. 13734-000...

  9. KC-135 and Other Microgravity Simulations

    NASA Technical Reports Server (NTRS)

    Skinner, Noel C.

    1999-01-01

    This document represents a summary of medical and scientific evaluations conducted aboard the KC-135 from June 20, 1998 to June 20, 1999. Included is a general overview of KC-135 activities manifested and coordinated by the Life Sciences Research Laboratories. A collection of brief reports that describes tests conducted aboard the KC-135 follows the overview. Principal investigators and test engineers contributed significantly to the content of the report describing their particular experiment or hardware evaluation. Although this document follows general guidelines, each report format may vary to accommodate differences in experiment design and procedures. This document concludes with an appendix that provides background information concerning the KC-135 and the Reduced-Gravity Program.

  10. KC-135 and Other Microgravity Simulations

    NASA Technical Reports Server (NTRS)

    Skinner, Noel C.; Schlegel, Todd T. (Technical Monitor)

    2001-01-01

    This document represents a summary of medical and scientific evaluations conducted aboard the KC-135 from January to June 15, 2001. Included is a general overview of KC-135 activities manifested and coordinated by the Human Adaptation and Countermeasures Office. A collection of brief reports that describes tests conducted aboard the KC-135 follows the overview. Principal investigators and test engineers contributed significantly to the content of the report describing their particular experiment or hardware evaluation. Although this document follows general guidelines, each report format may vary to accommodate differences in experiment design and procedures. This document concludes with an appendix that provides background information concerning the KC-135 and the Reduced-Gravity Program.

  11. Process modeling KC-135 aircraft

    NASA Technical Reports Server (NTRS)

    Workman, Gary L.

    1991-01-01

    Instrumentation will be provided for KC-135 aircraft which will provide a quantitative measure of g-level variation during parabolic flights and its effect on experiments which demonstrate differences in results obtained with differences in convective flow. The flight apparatus will provide video recording of the effects of the g-level variations on varying fluid samples. The apparatus will be constructed to be available to fly on the KC-135 during most missions.

  12. KC-135A in flight - winglet study

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The KC-135 with the winglets in flight over the San Gabriel mountains, south of Edwards AFB. While wind tunnel tests suggested that winglets - developed by NASA Langley's Richard Whitcomb - would significantly reduce drag, flight research proved their usefulness. Winglets were installed on an Air Force KC-135 and research flights were made in 1979 and 1980. These showed drag in flight was reduced by as much as 7 percent. Winglets soon appeared on production aircraft, although these were smaller than those mounted on the KC-135.

  13. KC-135A in flight - winglet study

    NASA Technical Reports Server (NTRS)

    1979-01-01

    This Boeing KC-135 Stratotanker, besides being used extensively in its primary role as an inflight aircraft refueler, has assisted in several projects at the NASA Dryden Flight Research Center, Edwards, California. In 1979 and 1980, Dryden was involved with general aviation research with the KC-135. A special wingtip 'winglet', developed by Richard Whitcomb of Langley Research Center, was tested on the jet aircraft. Winglets are small, nearly vertical fins installed on an airplane's wing tips to help produce a forward thrust in the vortices that typically swirl off the end of the wing, thereby reducing drag. This winglet idea was tested at the Dryden Flight Research Center on a KC-135A tanker loaned to NASA by the Air Force. The research showed that the winglets could increase an aircraft's range by as much as 7 percent at cruise speeds. The first application of NASA's winglet technology in industry was in general aviation business jets, but winglets are now being incorporated into most new commercial and military transport jets, including the Gulfstream III and IV business jets, the Boeing 747-400 and MD-11 airliners, and the C-17 military transport. In 1957 and 1958, Dryden was asked by what was then the Civil Aeronautics Administration (later absorbed into the Federal Aviation Administration (FAA) in 1958) to help establish new approach procedure guidelines on cloud-ceiling and visibility minimums for Boeing's first jet airliner, the B-707. Dryden used a KC-135, the military variant of the 707, to aid the CAA in these tests. In the 1980's, a KC-135 was used in support of the Space Shuttle program. Since the Shuttle was to be launched from Florida, researchers wanted to test the effect of rain on the sensitive thermal tiles. Tiles were mounted on special fixtures on an F-104 aircraft and a P-3 Orion. The F-104 was flown in actual rain conditions, and also behind the KC-135 spray tanker as it released water. The KC-135, however, proved incapable of simulating

  14. Senator Jake Garn on the KC-135

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Senator Jake Garn appears to be springing from a trampoline in this scene, taken during a brief period of weightlessness provided by a parabola flown by the KC-135. Jeff Bingham, an aide to the senator, floats freely nearby (25616); Sen. Garn and Jeff Bingham prepare to ease from a partially anchored position to a totally free flying mode during a brief weightless session (25617); Sen. Garn gets an initial 'feel' of weightlessness as his feet float freely while he anchors himself with his hands. Seated nearby is his aide Bingham (25618); Sen. Garn (background) shares some of the ceiling space of the KC-135 with Bingham (25619); Sen. Garn (foreground) takes a seat behind the KC-135's crew in the forward cabin. Roger Zweig and Joseph S. Algranti, pilot and co-pilot, are partially visible in the background (25620).

  15. Grasping objects autonomously in simulated KC-135 zero-g

    NASA Technical Reports Server (NTRS)

    Norsworthy, Robert S.

    1994-01-01

    The KC-135 aircraft was chosen for simulated zero gravity testing of the Extravehicular Activity Helper/retriever (EVAHR). A software simulation of the EVAHR hardware, KC-135 flight dynamics, collision detection and grasp inpact dynamics has been developed to integrate and test the EVAHR software prior to flight testing on the KC-135. The EVAHR software will perform target pose estimation, tracking, and motion estimation for rigid, freely rotating, polyhedral objects. Manipulator grasp planning and trajectory control software has also been developed to grasp targets while avoiding collisions.

  16. STS 61-B crewmembers training on the KC-135 in zero-G

    NASA Image and Video Library

    1985-08-21

    STS 61-B crewmembers training on the KC-135 in zero-G. Views include Payload specialist Charles D. Walker attempting to down the lower torso of his extravehicular mobility unit (EMU) in zero-G in the KC-135. He is being assisted by other participants in the training (39135); Payload specialist Rodolfo Neri floating in midair during training in the KC-135 (39136,39138); Mission specialist Mary L. Cleave floating in midair during her training aboard the KC-135 (39137); Astronaut Bryan D. O'Connor assists Astronaut Sherwood C. Spring in completing his donning of the EMU in the KC-135 (39139); Technicians aid Spring with his EMU in the KC-135 (39140); O'Connor appears to be leaping up in zero-G aboard the KC-135 (39141); Astronaut Brewster Shaw is assisted by a technician to don his EMU (39142); Shaw is attempting to don the EMU gloves while O'Connor watches (39143); Shaw does jumping jacks while Neri attempts to travel down a rope guideline (39144).

  17. Optical signatures of bulk and solutions of KC{sub 8} and KC{sub 24}

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tristant, Damien; LPCNO, UMR-5215 CNRS, INSA, Université Fédérale de Toulouse-Midi-Pyrénées, Université de Toulouse, 135 Avenue de Rangueil, 31077 Toulouse; Wang, Yu

    2015-07-28

    We first performed an analysis of the shape of the Raman features of potassium-intercalated graphite at stage 1 (KC{sub 8} GIC) and 2 (KC{sub 24} GIC), respectively. By varying the excitation energy from ultraviolet to infrared, we observed a sign change of the Fano coupling factor below and above the optical transition related to the shift of the Fermi level which was determined from first principle calculations. This behavior is explained by a sign change in the Raman scattering amplitude of the electronic continuum. The GICs were then dissolved in two different solvents (N-Methyl-2-pyrrolidone and tetrahydrofuran), and the absorbance ofmore » the graphenide solutions obtained was measured in the UV range. Two peaks were observed which correspond to the maximum of the computed imaginary part of the optical index.« less

  18. 77 FR 29633 - Alta Wind VII, LLC, Alta Wind IX, LLC, Alta Wind X, LLC, Alta Wind XI, LLC, Alta Wind XII, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-68-000] Alta Wind VII, LLC, Alta Wind IX, LLC, Alta Wind X, LLC, Alta Wind XI, LLC, Alta Wind XII, LLC, Alta Wind XIII, LLC, Alta Wind XIV, LLC, Alta Wind XV, LLC, Alta Windpower Development, LLC, TGP Development Company, LLC...

  19. 75 FR 23263 - Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-62-000] Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC; Alta Wind VI, LLC; Alta Wind VII, LLC; Alta Wind VIII, LLC; Alta Windpower Development, LLC; TGP Development Company, LLC...

  20. 2010 MoDOT kcICON survey : final report, February 2010.

    DOT National Transportation Integrated Search

    2010-02-01

    The survey measures the Kansas City area residents satisfaction with the kcICON project, their perceptions of MoDOT as a result : of the project and what, if anything, would impress them regarding the kcICON project. A professional calling center ...

  1. KC-135A in flight - winglet study

    NASA Technical Reports Server (NTRS)

    1979-01-01

    During the 1970s, the focus at Dryden shifted from high-speed and high-altitude flight to incremental improvements in technology and aircraft efficiency. One manifestation of this trend occurred in the winglet flight research carried out on a KC-135 during 1979 and 1980. Richard Whitcomb at the Langley Research Center had originated the idea of adding small vertical fins to an aircraft's wing tips. His wind tunnel tests indicated that winglets produced a forward thrust, which reduced the strength of the vortices generated by an aircraft's wing tips and resulted in a reduction of drag and an increase in aircraft range. Whitcomb, who had previously developed the area rule concept and the supercritical wing, selected the best winglet shape for flight tests on a KC-135 tanker. When the tests were completed, the data showed that the winglets provided a 7 percent improvement in range over the standard KC-135. The obvious economic advantage at a time of high fuel costs caused winglets to be adopted on business jets, airliners, and heavy military transports.

  2. 77 FR 37391 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ...: Bear Swamp Power Company LLC, Brookfield Energy Marketing Inc., Brookfield Energy Marketing LP... Power, LLC, Great Lakes Hydro America LLC, Hawks Nest Hydro LLC, Longview Fibre Paper and Packaging, Inc., Rumford Falls Hydro LLC. Description: Supplement to Notice of Non-Material Change in Status of Bear Swamp...

  3. 78 FR 57375 - Toutant Hydro Power, Inc.; Energy System, LLC.; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ... viewed or printed on the eLibrary link of Commission's Web site at http://www.ferc.gov/docs-filing... Power, Inc.; Energy System, LLC.; Notice of Application for Transfer of License, and Soliciting Comments... System, LLC (transferee) filed an application for transfer of license for the M.S.C. Power Project, FERC...

  4. 75 FR 11153 - Hydro Energy Technologies, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ...-long gravity dam; (2) a existing 36-acre impoundment with a storage capacity of 250 acre feet.; (3) an... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13627-000] Hydro Energy..., Motions To Intervene, and Competing Applications March 1, 2010. On November 6, 2009, Hydro Energy...

  5. 78 FR 76609 - Genesis Solar, LLC; NRG Delta LLC; Mountain View Solar, LLC; Pheasant Run Wind, LLC; Pheasant Run...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-18

    ... Delta LLC; Mountain View Solar, LLC; Pheasant Run Wind, LLC; Pheasant Run Wind II, LLC; Tuscola Wind II, LLC; Mountain Wind Power, LLC; Mountain Wind Power II, LLC; Summerhaven Wind, LP; Notice of...

  6. KC-135 Survivability in a War in Europe

    DTIC Science & Technology

    1989-05-01

    IIESEARCHlRPR KC-135 SURVIVA~BILITY IN4 A WA~R IN EUROPE 6T COL joHN EKWALL 3.989c ei-.T ..... , t =T’ p \\47 MR JIVERSI~r UAIRE s’rAT AIR FORCE ...MAWEIJL AIR FORCE BASbAB AIR WAR COLLEGE AIR UNIVERSITY KC-135 SURVIVABILITY IN A WAR IN EUROPE by John Ekwall Lieutenant Colonel, USAF A DEFENSE...ANALYTICAL STUDY SUBMITTED TO THE FACULTY IN FULLFILLMENT OF THE CURRICULUM REQUIREMENT Advisor: Colonel Frank W. Anderson, Jr. MAXWELL AIR FORCE BASE

  7. 77 FR 61597 - Avalon Wind, LLC; Avalon Wind 2, LLC; Catalina Solar, LLC; Catalina Solar 2, LLC; Pacific Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-109-000] Avalon Wind, LLC; Avalon Wind 2, LLC; Catalina Solar, LLC; Catalina Solar 2, LLC; Pacific Wind Lessee, LLC; Pacific Wind 2, LLC; Valentine Solar, LLC; EDF Renewable Development, Inc.; Notice of Petition for Declaratory...

  8. 77 FR 48138 - Topaz Solar Farms LLC; High Plains Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC; Pacific Wind, LLC; Colorado Highlands Wind, LLC; Shooting Star Wind Project, LLC; Notice of Effectiveness of Exempt Wholesale Generator or...

  9. 75 FR 45623 - Morris Energy Group, LLC v.PSEG Energy Resources & Trade LLC; PSEG Fossil LLC; and PSEG Power LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-79-000] Morris Energy Group, LLC v.PSEG Energy Resources & Trade LLC; PSEG Fossil LLC; and PSEG Power LLC; Notice of Complaint...) filed a complaint against PSEG Energy Resources & Trade, LLC, PSEG Fossil LLC and PSEG Power LLC (PSEG...

  10. 78 FR 19699 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    .... Applicants: Alta Wind VIII, LLC, Bear Swamp Power Company LLC, Brookfield Energy Marketing, Inc., Brookfield..., Great Lakes Hydro America LLC, Hawks Nest Hydro LLC, Longview Fibre Paper and Packaging, Inc., Rumford...

  11. Testing Microgravity Flight Hardware Concepts on the NASA KC-135

    NASA Technical Reports Server (NTRS)

    Motil, Susan M.; Harrivel, Angela R.; Zimmerli, Gregory A.

    2001-01-01

    This paper provides an overview of utilizing the NASA KC-135 Reduced Gravity Aircraft for the Foam Optics and Mechanics (FOAM) microgravity flight project. The FOAM science requirements are summarized, and the KC-135 test-rig used to test hardware concepts designed to meet the requirements are described. Preliminary results regarding foam dispensing, foam/surface slip tests, and dynamic light scattering data are discussed in support of the flight hardware development for the FOAM experiment.

  12. 77 FR 42714 - Eagle Creek Hydropower, LLC, Eagle Creek Land Resources, LLC, Eagle Creek Water Resources, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Hydropower, LLC, Eagle Creek Land Resources, LLC, Eagle Creek Water Resources, LLC; Notice of Application...: Eagle Creek Hydropower, LLC; Eagle Creek Land Resources, LLC; and Eagle Creek Water Resources, LLC. e... Contact: Robert Gates, Senior Vice President-- Operations, Eagle Creek Hydropower, LLC, Eagle Creek Water...

  13. 78 FR 32385 - Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-64-000] Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC; Constellation NewEnergy...) Rules of Practice and Procedure, 18 CFR 385.207, Exelon Generation Company, LLC, CER Generation II, LLC...

  14. 77 FR 14010 - Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ..., EG12-18-000, EG12-19-000, EG12- 20-000, EG12-21-000, EG12-22-000, EG12-23-000] Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC, Minco Wind Interconnection Services, LLC, Shiloh III Lessee, LLC, California Ridge Wind Energy LLC, Perrin Ranch Wind, LLC, Erie Wind...

  15. Air Force KC-X Tanker Aircraft Program: Background and Issues for Congress

    DTIC Science & Technology

    2009-12-22

    24, 2009, the Department of Defense (DOD) announced its proposed strategy for conducting a new competition between Boeing and a team consisting of...acquire a new tanker over the past several years have ultimately failed. DOD’s proposed new KC-X acquisition competition strategy poses several...5 DOD’s Proposed New KC-X Competition Strategy ...............................................................5

  16. 78 FR 29364 - Exelon Corporation, Exelon Wind 1, LLC, Exelon Wind 2, LLC, Exelon Wind 3, LLC, Exelon Wind 4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ...-005, QF07-55-005, QF07-56-005, QF07-257-004] Exelon Corporation, Exelon Wind 1, LLC, Exelon Wind 2, LLC, Exelon Wind 3, LLC, Exelon Wind 4, LLC, Exelon Wind 5, LLC, Exelon Wind 6, LLC, Exelon Wind 7, LLC, Exelon Wind 8, LLC, Exelon Wind 9, LLC, Exelon Wind 10, LLC, Exelon Wind 11, LLC, High Plains...

  17. Investigation of surface tension phenomena using the KC-135 aircraft

    NASA Technical Reports Server (NTRS)

    Alter, W. S.

    1982-01-01

    The microgravity environment of the KC-135 aircraft was utilized in three experiments designed to determine the following: (1) the feasibility of measuring critical wetting temperatures; (2) the effectiveness of surface tension as a means of keeping the cushioning heat transfer liquid in the furnace during ampoule translation; and (3) whether a non-wetting fluid would separate from the ampoule wall under low gravity conditions. This trio of investigations concerning surface phenomena demonstrates the effectiveness of the KC-135 as a microgravity research environment for small-scale, hand-held experiments.

  18. Kc167, a widely used Drosophila cell line, contains an active primary piRNA pathway.

    PubMed

    Vrettos, Nicholas; Maragkakis, Manolis; Alexiou, Panagiotis; Mourelatos, Zissimos

    2017-01-01

    PIWI family proteins bind to small RNAs known as PIWI-interacting RNAs (piRNAs) and play essential roles in the germline by silencing transposons and by promoting germ cell specification and function. Here we report that the widely used Kc167 cell line, derived from Drosophila melanogaster embryos, expresses piRNAs that are loaded to Aub and Piwi. Kc167 piRNAs are produced by a canonical, primary piRNA biogenesis pathway, from phased processing of precursor transcripts by the Zuc endonuclease, Armi helicase, and dGasz mitochondrial scaffold protein. Kc167 piRNAs derive from cytoplasmic transcripts, notably tRNAs and mRNAs, and their abundance correlates with that of parent transcripts. The expression of Aub is robust in Kc167, that of Piwi is modest, while Ago3 is undetectable, explaining the lack of transposon-related piRNA amplification by the Aub-Ago3, ping-pong mechanism. We propose that the default state of the primary piRNA biogenesis machinery is random transcript sampling to allow generation of piRNAs from any transcript, including newly acquired retrotransposons. This state is unmasked in Kc167, likely because they do not express piRNA cluster transcripts in sufficient amounts and do not amplify transposon piRNAs. We use Kc167 to characterize an inactive isoform of Aub protein. Since most Kc167 piRNAs are genic, they can be mapped uniquely to the genome, facilitating computational analyses. Furthermore, because Kc167 is a widely used and well-characterized cell line that is easily amenable to experimental manipulations, we expect that it will serve as an excellent system to study piRNA biogenesis and piRNA-related factors. © 2016 Vrettos et al.; Published by Cold Spring Harbor Laboratory Press for the RNA Society.

  19. KC-135 Winglet Program Review

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The results of a joint NASA/USAF program to develop flight test winglets on a KC-135 aircraft are reviewed. The winglet development from concept through wind tunnel and flight tests is discussed. Predicted, wind tunnel, and flight test results are compared for the performance, loads and flutter characteristics of the winglets. The flight test winglets had a variable winglet cant and incidence angle capability which enabled a limited evaluation of the effects of these geometry changes.

  20. CXC chemokine KC fails to induce neutrophil infiltration and neoangiogenesis in a mouse model of myocardial infarction.

    PubMed

    Oral, Hasan; Kanzler, Isabella; Tuchscheerer, Nancy; Curaj, Adelina; Simsekyilmaz, Sakine; Sönmez, Tolga Taha; Radu, Eugen; Postea, Otilia; Weber, Christian; Schuh, Alexander; Liehn, Elisa A

    2013-07-01

    Chemokines and neutrophils, known as important players in the inflammatory cascade, also contribute to heart tissue recovery and scar formation after myocardial infarction (MI). The objective of this study was to determine the importance of ELR-containing CXC chemokine KC in neutrophil infiltration and neoangiogenesis, in a mouse model of chronic MI. MI was induced in mice divided in four groups: control (untreated), anti-KC "later" (anti-KC antibody injections started 4 days after MI and then delivered every 72 hours for 3 weeks, to inhibit angiogenesis), anti-KC "earlier" (anti-KC antibody injections 1 day before and 1 day after MI, to block neutrophil infiltration), anti-KC (anti-KC antibody injections 1 day before and 1 day after MI, and then every 72 hours for 3 weeks). The efficiency of the anti-KC treatment was determined by the measurement of KC serum concentration and immunofluorescence staining, in each of the four groups. Surprisingly, we did not find any difference in neutrophil infiltration in the infarcted area between untreated and treated animals. Moreover, the heart function, infarct size, and neoangiogenesis were not different between the four groups. As expected, a comparable anti-CXCR2 treatment of mice before and after MI was able to significantly reduce neutrophil infiltration into the infarcted area and angiogenesis, but also to reduce the infarction size after long or "later" treatment. The major finding of our study is that KC, a potent neutrophil chemoattractant and an established angiogenic factor, failed to interfere in the post-infarction inflammatory response, in wound healing and scar formation after MI. Therefore, these aspects need to be carefully taken into account when devising therapeutic strategies for myocardial infarction and ischemic cardiomyopathy. Copyright © 2013 Elsevier Ltd. All rights reserved.

  1. Air Force KC-X Tanker Aircraft Program: Background and Issues for Congress

    DTIC Science & Technology

    2009-12-07

    24, 2009, the Department of Defense (DOD) announced its proposed strategy for conducting a new competition between Boeing and a team consisting of...acquire a new tanker over the last several years have ultimately failed. DOD’s proposed new KC-X acquisition competition strategy poses several...5 DOD’s Proposed New KC-X Competition Strategy ...............................................................5 Response to the Draft RFP

  2. 78 FR 53452 - Notice Announcing Filing Priority for Preliminary Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Lock+ Hydro Friends Fund XXX, LLC.. Project No. 13625-003 FFP Project 121, LLC.... FFP Project 121, LLC Project No. 14504-000 2. Lock+ Hydro Friends Fund XXX, LLC Project No. 13625-003...

  3. Isolation and analysis of a multifunctional triterpene synthase KcMS promoter region from mangrove plant kandelia candel

    NASA Astrophysics Data System (ADS)

    Basyuni, M.; Wati, R.; Sulistiyono, N.; Sumardi; Oku, H.; Baba, S.; Sagami, H.

    2018-03-01

    Molecular cloning of Kandelia candel KcMS gene has previously been cloned and encoded a multifunctional triterpene synthase. In this study, the KcMS gene promoter was cloned through Genome walking, sequenced, and analyzed. A 1,358 bp genomic DNA fragment of KcMS promoter was obtained. PLACE and PlantCARE analysis of the KcMS promoter revealed that there was some regulatory elements in response to environmental signals and involved in the regulation of gene expression. Results showed that four kinds of elements are regulated by hormone binding, namely 2 MeJA-responsiveness elements (CGTCA-motif and TGACG-motif), the ABRE (TACGTG) involved in abscisic acid responsiveness, gibberellin-related GARE-motif (AAACAGA), and the TGA-element (AACGAC) as an auxin-responsive element. Several elements in the KcMS have been shown in other plants to be responsive to abiotic stress. These motifs were MBS (CAACTG), TC-rich repeats, and eight light responsive elements. The KcMS promoter was also involved in the activation of defense genes in plants such as HSE (AAAAAATTC) and four circadian control elements (CAANNNNATC). The presence of multipotential regulatory motifs suggested that KcMS may be involved in regulation of plant tolerance to several types of stresses.

  4. 75 FR 47301 - Cedro Hill Wind LLC; Butler Ridge Wind Energy Center, LLC; High Majestic Wind Energy Center, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-05

    ...- 000; EG10-34-000; EG10-34-000; EG10-35-000; EG10-36-000; EG10-37-000; EG10-38-000] Cedro Hill Wind LLC; Butler Ridge Wind Energy Center, LLC; High Majestic Wind Energy Center, LLC; Wessington Wind Energy Center, LLC; Juniper Canyon Wind Power LLC; Loraine Windpark Project, LLC; White Oak Energy LLC; Meadow...

  5. 78 FR 71601 - KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... total capacity of 1,700 kilowatts (kW), installed within the existing intake tower; (2) an electrical control booth constructed on top of the intake tower; and (3) a 700- foot-long, 13.2 kilo-Volt (kV...; (3) a powerhouse containing two generating units with a total capacity of 3,320 kW; (4) the existing...

  6. 77 FR 60413 - Uniontown Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ..., LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready..., and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original...

  7. 78 FR 9907 - TGP Development Company, LLC; TGP Flying Cloud Holdings, LLC; WEC TX Company, LLC v. Arizona...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-45-000] TGP Development Company, LLC; TGP Flying Cloud Holdings, LLC; WEC TX Company, LLC v. Arizona Public Service Company... Cloud Holdings, LLC, and WEC TX Company, LLC (collectively, Complainants) filed a formal complaint...

  8. 75 FR 1052 - Terra-Gen Dixie Valley, LLC; TGP Dixie Development Company, LLC; New York Canyon, LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-29-000] Terra-Gen Dixie Valley, LLC; TGP Dixie Development Company, LLC; New York Canyon, LLC; Notice of Filing December 30, 2009. Take notice that on December 24, 2009, Terra-Gen Dixie Valley, LLC, TGP Dixie Development Company, LLC and New York Canyon, LLC (``Petitioner...

  9. 75 FR 7305 - Drake Switching Company, LLC-Operation Exemption- Drake Cement, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-18

    ... Switching Company, LLC--Operation Exemption-- Drake Cement, LLC Drake Switching Company, LLC (DSC), a... and operated by Drake Cement, LLC.\\1\\ \\1\\ Drake Cement, LLC filed a verified notice of exemption to acquire these track in STB Finance Docket No. 35350, Drake Cement, LLC--Acquisition Exemption--Clarkdale...

  10. Central Nervous System Pathology Progresses Independently of KC and CXCR2 in Globoid-Cell Leukodystrophy

    PubMed Central

    Reddy, Adarsh S.; Patel, Jigisha R.; Vogler, Carole; Klein, Robyn S.; Sands, Mark S.

    2013-01-01

    Globoid-cell Leukodystrophy (GLD; Krabbe’s disease) is a rapidly progressing inherited demyelinating disease caused by a deficiency of the lysosomal enzyme Galactosylceramidase (GALC). Deficiency of GALC leads to altered catabolism of galactosylceramide and the cytotoxic lipid, galactosylsphingosine (psychosine). This leads to a rapidly progressive fatal disease with spasticity, cognitive disability and seizures. The murine model of GLD (Twitcher; GALC−/−) lacks the same enzyme and has similar clinical features. The deficiency of GALC leads to oligodendrocyte death, profound neuroinflammation, and the influx of activated macrophages into the CNS. We showed previously that keratinocyte chemoattractant factor (KC) is highly elevated in the CNS of untreated Twitcher mice and significantly decreases after receiving a relatively effective therapy (bone marrow transplantation combined with gene therapy). The action of KC is mediated through the CXCR2 receptor and is a potent chemoattractant for macrophages and microglia. KC is also involved in oligodendrocyte migration and proliferation. Based on the commonalities between the disease presentation and the functions of KC, we hypothesized that KC and/or CXCR2 contribute to the pathogenesis of GLD. Interestingly, the course of the disease is not significantly altered in KC- or CXCR2-deficient Twitcher mice. There is also no alteration in inflammation or demyelination patterns in these mice. Furthermore, transplantation of CXCR2-deficient bone marrow does not alter the progression of the disease as it does in other models of demyelination. This study highlights the role of multiple redundant cytokines and growth factors in the pathogenesis of GLD. PMID:23755134

  11. 77 FR 63311 - Lake Clementine Hydro, LLC; Notice of Successive Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Dam on the North Fork of the American River, near the City of Auburn, Placer County, California. The... Fork Dam, Lake Clementine Hydro plans to install two 7.5 megawatt (MW) generation units, for a total... to study three alternative designs for the project. Applicant Contact: Mr. Magnus Johannesson...

  12. Astronaut Catherine G. Coleman aboard KC-135 aircraft

    NASA Image and Video Library

    1994-05-28

    S94-35542 (June 1994) --- Astronaut Catherine G. Coleman, mission specialist, gets a preview of next year?s United States Microgravity Laboratory (USML-2) mission aboard the Space Shuttle Columbia. The weightless experience was afforded by a special parabolic pattern flown by NASA?s KC-135 ?zero gravity? aircraft.

  13. KC-135 winglet program overview

    NASA Technical Reports Server (NTRS)

    Barber, M. R.; Selegan, D.

    1982-01-01

    A joint NASA/USAF program was conducted to accomplish the following objectives: (1) evaluate the benefits that could be achieved from the application of winglets to KC-135 aircraft; and (2) determine the ability of wind tunnel tests and analytical analysis to predict winglet characteristics. The program included wind-tunnel development of a test winglet configuration; analytical predictions of the changes to the aircraft resulting from the application of the test winglet; and finally, flight tests of the developed configuration. Pressure distribution, loads, stability and control, buffet, fuel mileage, and flutter data were obtained to fulfill the objectives of the program.

  14. 75 FR 55315 - National Fuel Marketing Company, LLC; NFM Midstream, LLC; NFM Texas Pipeline, LLC; NFM Texas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IN09-10-000] National Fuel Marketing Company, LLC; NFM Midstream, LLC; NFM Texas Pipeline, LLC; NFM Texas Gathering, LLC; Notice of Amended Designation of Commission Staff as Non-Decisional September 2, 2010. On January 15, 2009, the Commission issued an order in the above-...

  15. 75 FR 76453 - Top of the World Wind Energy, LLC; Kit Carson Windpower, LLC; Chestnut Flats Wind, LLC; Minco...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG10-65-000; EG10-66-000; EG10-67-000; EG10-68-000; EG10- 69-000; EG10-70-000; EG10-71-000] Top of the World Wind Energy, LLC; Kit Carson Windpower, LLC; Chestnut Flats Wind, LLC; Minco Wind, LLC; Arizona Solar One LLC; Criterion...

  16. 75 FR 49929 - Music Mountain Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13760-000] Music Mountain..., Motions To Intervene, and Competing Applications August 9, 2010. On May 18, 2010, Music Mountain Hydro..., proposing to study the feasibility of the Music [[Page 49930

  17. Stainless Steel NaK-Cooled Circuit (SNaKC) Fabrication and Assembly

    NASA Technical Reports Server (NTRS)

    Godfroy, Thomas J.

    2007-01-01

    An actively pumped Stainless Steel NaK Circuit (SNaKC) has been designed and fabricated by the Early Flight Fission Test Facility (EFF-TF) team at NASA's Marshall Space Flight Center. This circuit uses the eutectic mixture of sodium and potassium (NaK) as the working fluid building upon the experience and accomplishments of the SNAP reactor program from the late 1960's The SNaKC enables valuable experience and liquid metal test capability to be gained toward the goal of designing and building an affordable surface power reactor. The basic circuit components include a simulated reactor core a NaK to gas heat exchanger, an electromagnetic (EM) liquid metal pump, a liquid metal flow meter, an expansion reservoir and a drain/fill reservoir To maintain an oxygen free environment in the presence of NaK, an argon system is utilized. A helium and nitrogen system are utilized for core, pump, and heat exchanger operation. An additional rest section is available to enable special component testing m an elevated temperature actively pumped liquid metal environment. This paper summarizes the physical build of the SNaKC the gas and pressurization systems, vacuum systems, as well as instrumentation and control methods.

  18. 78 FR 69402 - Lock 7 Hydro Partners, LLC; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... Partners, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To [email protected] . j. Deadline for filing comments, motions to intervene, and protests: 30 days from.... Please file any motion to intervene, protest, comments, and/or recommendations using the Commission's e...

  19. Astronaut Gregory Jarvis during KC-135 zero gravity training

    NASA Image and Video Library

    1985-01-25

    S85-26106 (25 Jan. 1985) --- Astronaut Gregory Jarvis gets a familiarization session in weightlessness aboard a KC-135 "zero gravity" aircraft. Jarvis was originally assigned as payload specialist to STS-51D but was reassigned to STS-51L. Photo credit: NASA

  20. 76 FR 40946 - WNC Tax Credits 40, LLC, WNC Tax Credits 41, LLC, WNC Housing Tax Credits Manager 2, LLC, WNC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... Credits 40, LLC, WNC Tax Credits 41, LLC, WNC Housing Tax Credits Manager 2, LLC, WNC National Partners... (``Fund 41'') (each a ``Fund,'' and collectively, the ``Funds''), WNC Housing Tax Credits Manager 2, LLC (the ``Manager''), WNC National Partners, LLC (``WNC National Partners'') and WNC & Associates, Inc...

  1. 75 FR 7303 - Drake Cement, LLC-Acquisition Exemption-Clarkdale Arizona Central Railroad, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-18

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Finance Docket No. 35350] Drake Cement, LLC--Acquisition Exemption--Clarkdale Arizona Central Railroad, LLC Drake Cement, LLC (DC), a..., Drake Switching Company, LLC --Operation Exemption-- Drake Cement, LLC. DC certifies that the projected...

  2. 77 FR 38043 - Great Lakes Hydro America, LLC; Notice of Application Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... America, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and.... Deadline for filing comments, motions to intervene, and protests, is July 23, 2012. All documents may be... of your comments. Please include the project number (P-2458-198) on any comments, motions, or...

  3. 76 FR 2370 - Mount Storm Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13863-000] Mount Storm..., Motions To Intervene, and Competing Applications January 6, 2011. On October 14, 2010, Mount Storm Hydro... (FPA), proposing to study the feasibility of the Mount Storm Pumped Storage Project to be located near...

  4. Cryo-EM structure and biochemical analysis reveal the basis of the functional difference between human PI3KC3-C1 and -C2.

    PubMed

    Ma, Meisheng; Liu, Jun-Jie; Li, Yan; Huang, Yuwei; Ta, Na; Chen, Yang; Fu, Hua; Ye, Ming-Da; Ding, Yuehe; Huang, Weijiao; Wang, Jia; Dong, Meng-Qiu; Yu, Li; Wang, Hong-Wei

    2017-08-01

    Phosphatidylinositol 3-phosphate (PI3P) plays essential roles in vesicular trafficking, organelle biogenesis and autophagy. Two class III phosphatidylinositol 3-kinase (PI3KC3) complexes have been identified in mammals, the ATG14L complex (PI3KC3-C1) and the UVRAG complex (PI3KC3-C2). PI3KC3-C1 is crucial for autophagosome biogenesis, and PI3KC3-C2 is involved in various membrane trafficking events. Here we report the cryo-EM structures of human PI3KC3-C1 and PI3KC3-C2 at sub-nanometer resolution. The two structures share a common L-shaped overall architecture with distinct features. EM examination revealed that PI3KC3-C1 "stands up" on lipid monolayers, with the ATG14L BATs domain and the VPS34 C-terminal domain (CTD) directly contacting the membrane. Biochemical dissection indicated that the ATG14L BATs domain is responsible for membrane anchoring, whereas the CTD of VPS34 determines the orientation. Furthermore, PI3KC3-C2 binds much more weakly than PI3KC3-C1 to both PI-containing liposomes and purified endoplasmic reticulum (ER) vesicles, a property that is specifically determined by the ATG14L BATs domain. The in vivo ER localization analysis indicated that the BATs domain was required for ER localization of PI3KC3. We propose that the different lipid binding capacity is the key factor that differentiates the functions of PI3KC3-C1 and PI3KC3-C2 in autophagy.

  5. 76 FR 35875 - Blue Heron Hydro LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13368-002] Blue Heron Hydro... Minor License. b. Project No.: 13368-002. c. Date filed: November 1, 2010. d. Applicant: Blue Heron.... Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r). h. Applicant Contact: Lori Barg, Blue...

  6. 78 FR 21931 - Pelzer Hydro Company, Inc. Consolidated Hydro Southeast, Inc.; Notice of Intent To File License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ...] Pelzer Hydro Company, Inc. Consolidated Hydro Southeast, Inc.; Notice of Intent To File License.... Submitted by: Pelzer Hydro Company, Inc. and Consolidated Hydro Southeast, Inc., both fully owned... at [email protected] . j. Pelzer Hydro Company, Inc. and Consolidated Hydro Southeast, Inc., filed...

  7. 75 FR 17976 - WNC Tax Credits 38, LLC, WNC Tax Credits 39, LLC, WNC Housing Tax Credits Manager, LLC and WNC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Credits 38, LLC, WNC Tax Credits 39, LLC, WNC Housing Tax Credits Manager, LLC and WNC & Associates, Inc... collectively, the ``Funds''), WNC Housing Tax Credits Manager, LLC (the ``Manager'') and WNC & Associates, Inc... credit under the Internal Revenue Code of 1986, as amended. The Manager is a California limited liability...

  8. 77 FR 12276 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ..., LLC, Bear Swamp Power Company LLC, Brookfield Energy Marketing Inc., Brookfield Energy Marketing LP...., Erie Boulevard Hydropower, L.P., Granite Reliable Power, LLC, Great Lakes Hydro America, LLC, Hawks...

  9. 76 FR 67775 - Citadel LLC (formerly Citadel Investment Group, L.L.C.) and CEIF LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... SECURITIES AND EXCHANGE COMMISSION [Investment Company Act Release No. 29851; File No. 813-00377] Citadel LLC (formerly Citadel Investment Group, L.L.C.) and CEIF LLC; Notice of Application October 27... order under sections 6(b) and 6(e) of the Investment Company Act of 1940 (the ``Act'') granting an...

  10. 77 FR 75701 - Landisville Railroad, LLC-Operation Exemption-Buckeye East Chicago Railroad LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Railroad, LLC--Operation Exemption--Buckeye East Chicago Railroad LLC Landisville Railroad, LLC... operate approximately 7,065 feet (1.34 miles) of track,\\1\\ existing railroad right-of-way, and bulk liquid transloading facilities owned by Buckeye East Chicago Railroad, LLC, a Class III rail carrier, in East Chicago...

  11. 77 FR 40608 - Notice of Petition for Enforcement and Declaratory Order; Exelon Wind 1, LLC; Exelon Wind 2, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Petition for Enforcement and Declaratory Order; Exelon Wind 1, LLC; Exelon Wind 2, LLC; Exelon Wind 3, LLC; Exelon Wind 4, LLC; Exelon Wind 5, LLC; Exelon Wind 6, LLC; Exelon Wind 7, LLC; Exelon Wind 8, LLC; Exelon Wind 9, LLC; Exelon Wind 10, LLC; Exelon Wind 11, LLC; High Plains Wind Power, LLC Take notice...

  12. KC-46 Workforce Requirements for Depot Maintenance Activation

    DTIC Science & Technology

    2014-03-27

    commercial derivative aircraft . These are aircraft originally designed for commercial aviation but with modifications that change the aircraft to fit the... designing the process to capture the data needed to infer answers to the research questions. More needs to be understood about how aircraft maintenance...Air Force projects receiving new KC-46 aircraft in 2016 and headquarters is directing organic maintenance. Oklahoma City ALC is the depot projected

  13. General purpose free floating platform for KC-135 flight experimentation

    NASA Technical Reports Server (NTRS)

    Borchers, Bruce A.; Yendler, Boris S.; Kliss, Mark H.; Gonzales, Andrew A.; Edwards, Mark T.

    1994-01-01

    The Controlled Ecological Life Support Systems (CELSS) program is evaluating higher plants as a means of providing life support functions aboard space craft. These plant systems will be capable of regenerating air and water while meeting some of the food requirements of the crew. In order to grow plants in space, a series of systems are required to provide the necessary plant support functions. Some of the systems required for CELSS experiments are such that is is likely that existing technologies will require refinement, or novel technologies will need to be developed. To evaluate and test these technologies, a series of KC-135 precursor flights are being proposed. A general purpose free floating experiment platform is being developed to allow the KC-135 flights to be used to their fullest. This paper will outline the basic design for the CELSS Free Floating Test Bed (FFTB), and the requirements for the individual subsystems. Several preliminary experiments suitable for the free floater will also be discussed.

  14. 78 FR 62612 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC14-3-000...: PE Hydro Generation, LLC Description: Self-Certification of EG of PE Hydro Generation, LLC. Filed...

  15. Materials science on parabolic aircraft: The FY 1987-1989 KC-135 microgravity test program

    NASA Technical Reports Server (NTRS)

    Curreri, Peter A. (Editor)

    1993-01-01

    This document covers research results from the KC-135 Materials Science Program managed by MSFC for the period FY87 through FY89. It follows the previous NASA Technical Memorandum for FY84-86 published in August 1988. This volume contains over 30 reports grouped into eight subject areas covering acceleration levels, space flight hardware, transport and interfacial studies, thermodynamics, containerless processing, welding, melt/crucible interactions, and directional solidification. The KC-135 materials science experiments during FY87-89 accomplished direct science, preparation for space flight experiments, and justification for new experiments in orbit.

  16. 75 FR 62378 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-08

    .... Docket Numbers: ER10-3220-000. Applicants: Electricity Maine, LLC. Description: Electricity Maine, LLC..., October 21, 2010. Docket Numbers: ER10-3226-000. Applicants: Great Bay Hydro Corporation. Description: Great Bay Hydro Corporation submits tariff filing per 35.12: Baseline eTariff Filing Pursuant to Order...

  17. 76 FR 36914 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-42-000] Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC, v. New York Independent System Operator, Inc. Notice of Revised...

  18. 76 FR 34692 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-42-000] Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC; v. New York Independent System Operator, Inc.; Notice of Complaint...

  19. 76 FR 36910 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-42-000] Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC. v. New York Independent System Operator, Inc.; Notice of Amendment t...

  20. 76 FR 71959 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... shaft Kaplan turbine-generating unit with a total installed capacity of 0.84 MW; (5) a new 135-foot-long... outlet works; (4) a minimum flow turbine generator and a new 2,000-square-foot powerhouse containing one or two submersible or tubular-type turbine generators with a total installed capacity of 0.36 MW; (5...

  1. 76 FR 72699 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ....2001(a)(1)(iii) and the instructions on the Commission's Web site http:[sol][sol]www.ferc.gov/docs... registration, using the eComment system at http:[sol][sol]www.ferc.gov/docs-filing/ecomment.asp. You must... http:[sol][sol]www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P-14248-000) in the...

  2. 78 FR 15053 - Simpson Lumber Company, LLC, Shelton, Washington; Simpson Lumber Company, LLC, Tacoma, Washington...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ...,372B] Simpson Lumber Company, LLC, Shelton, Washington; Simpson Lumber Company, LLC, Tacoma, Washington; Simpson Lumber Company, LLC, Longview, Washington; Notice of Revised Determination on Reconsideration On... Reconsideration for the workers and former workers of Simpson Lumber Company, LLC, Shelton, Washington (TA-W-81...

  3. 77 FR 38884 - Professional Transportation, Inc.-Asset Acquisition-CUSA ES, LLC and CUSA CSS, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ..., Inc.--CUSA ES, LLC (MC-463168) and CUSA CSS, LLC (MC-522544) (collectively, Coach America Subsidiaries... Transportation, Inc.--Asset Acquisition--CUSA ES, LLC and CUSA CSS, LLC AGENCY: Surface Transportation Board. ACTION: Notice of Finance Application. SUMMARY: Professional Transportation, Inc. (PTI or Applicant), an...

  4. Polarizability of KC60: Evidence for Potassium Skating on the C60 Surface

    NASA Astrophysics Data System (ADS)

    Rayane, D.; Antoine, R.; Dugourd, Ph.; Benichou, E.; Allouche, A. R.; Aubert-Frécon, M.; Broyer, M.

    2000-02-01

    We present the first measurement of the polarizability and the permanent dipole moment of isolated KC60 molecules by molecular beam deflection technique. We have obtained a value of 2506+/-250 Å3 for the polarizability at room temperature. The addition of a potassium atom enhances by more than a factor of 20 the polarizability of a pure C60 molecule. This very high polarizability and the lack of observed permanent dipole show that the apparent polarizability of KC60 is induced by the free skating of the potassium atom on the C60 surface, resulting in a statistical orientation of the dipole. The results are interpreted with a simple model similar to the Langevin theory for paramagnetic systems.

  5. 78 FR 929 - TransCanada Hydro Northeast Inc.; FirstLight Hydro Generating Company; Notice of Intent To File...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... P-1904-073; Project Nos. P- 1889-081 and P-2485-063] TransCanada Hydro Northeast Inc.; FirstLight.... Submitted By: TransCanada Hydro Northeast Inc. (P-1892-026, P- 1855-045, and P-1904-073); FirstLight Hydro... Projects--John S. Howard, Director--FERC Hydro Compliance, FirstLight Hydro Generating Company, Northfield...

  6. 77 FR 10739 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... Drawing Project No. FFP Project 91, LLC 14275-000 Riverbank Hydro No. 23, LLC 14279-000 Lock+ Hydro... conduct a random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  7. 78 FR 21151 - Boise White Paper, LLC, A Subsidiary of Boise Paper Holdings, LLC, Including On-Site Leased...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ... Paper, LLC, A Subsidiary of Boise Paper Holdings, LLC, Including On-Site Leased Workers From Guardsmark.... Helens, OR; Boise White Paper, LLC, A Subsidiary of Boise Paper Holdings, LLC, Vancouver, WA; Amended... workers and former workers of Boise White Paper, LLC, a subsidiary of Boise Paper Holdings, LLC, St...

  8. 78 FR 25784 - Keenesburg Direct Railroad, LLC-Acquisition and Operation Exemption-J D East, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35735] Keenesburg Direct Railroad, LLC--Acquisition and Operation Exemption--J D East, LLC Keenesburg Direct Railroad, LLC (KDR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from J D East, LLC (JDE...

  9. 76 FR 19473 - Chrysler Financial Services Americas, LLC, a Subsidiary of FinCo Intermediate Holding Co., LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... Services Americas, LLC, a Subsidiary of FinCo Intermediate Holding Co., LLC, Troy Customer Contact Center... Co., LLC, Troy Customer Contact Center, Troy, Michigan (subject firm). The Department's Notice was... Services Americas, LLC, a subsidiary of FinCo Intermediate Holding Co., LLC, Troy Customer Contact Center...

  10. Air Force Air Refueling: The KC-X Aircraft Acquisition Program

    DTIC Science & Technology

    2008-04-04

    13 National Military Strategy (NMS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Mobility Capability Study...condition and sustainment costs of the KC-135” ... and that “an early replacement program would be a hedging strategy against that uncertainty.”40...the President’s overall national security strategy . Based on the President’s strategy , DOD periodically studies the global threat environment and

  11. 75 FR 65515 - Supermedia LLC, Formerally Known as IDEARC Media LLC, Supermedia Information Services LLC, Client...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ..., Formerally Known as IDEARC Media LLC, Supermedia Information Services LLC, Client Care Group and Publishing... September 3, 2010 and the Notice of Determination was published in the Federal Register on September 21... internal publishing support services. Workers are separately identifiable by service supplied. The negative...

  12. 76 FR 66709 - Trunkline Gas Company, LLC, Sea Robin Pipeline Company, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ... Company, LLC, Sea Robin Pipeline Company, LLC; Notice of Application Take notice that on October 7, 2011, Trunkline Gas Company, LLC (Trunkline) and Sea Robin Pipeline Company, LLC (Sea Robin), together referred to...), for permission and approval for Trunkline to abandon by sale to Sea Robin and for Sea Robin to acquire...

  13. STS-42 Payload Specialist Merbold inside KC-135 during zero gravity flight

    NASA Image and Video Library

    1988-05-24

    S88-37966 (2 Oct 1988) --- European Space Agency payload specialists Ulf Merbold (STS-42, right) and Reinhold Furrer (STS 61-A) get the "feel" of zero-gravity aboard NASA's KC-135 aircraft over the Gulf of Mexico.

  14. 75 FR 82426 - Big Four Terminal Railroad, LLC-Operation Exemption-RMW Ventures, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35454] Big Four Terminal Railroad, LLC--Operation Exemption--RMW Ventures, LLC Big Four Terminal Railroad, LLC (BFTR), has filed a verified notice of exemption under 49 CFR 1150.31 to operate over 5.2 +/- miles of rail line between...

  15. Volatile Removal Assembly Flight Experiment and KC-135 Packed Bed Experiment: Results and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Holder, Donald W.; Parker, David

    2000-01-01

    The Volatile Removal Assembly (VRA) is a high temperature catalytic oxidation process that will be used as the final treatment for recycled water aboard the International Space Station (ISS). The multiphase nature of the process had raised concerns as to the performance of the VRA in a microgravity environment. To address these concerns, two experiments were designed. The VRA Flight Experiment (VRAFE) was designed to test a full size VRA under controlled conditions in microgravity aboard the SPACEHAB module and in a 1 -g environment and compare the performance results. The second experiment relied on visualization of two-phase flow through small column packed beds and was designed to fly aboard NASA's microgravity test bed plane (KC-135). The objective of the KC-135 experiment was to understand the two-phase fluid flow distribution in a packed bed in microgravity. On Space Transportation System (STS) flight 96 (May 1999), the VRA FE was successfully operated and in June 1999 the KC-135 packed bed testing was completed. This paper provides an overview of the experiments and a summary of the results and findings.

  16. 75 FR 76520 - Tennessee Southern Railroad Company, Patriot Rail, LLC, Patriot Rail Holdings LLC, and Patriot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... family by converting two of its subsidiaries from corporations into limited liability companies: (1... Railroad Company, Patriot Rail, LLC, Patriot Rail Holdings LLC, and Patriot Rail Corp.--Corporate Family... Railroad Company (TSRR), Patriot Rail, LLC (PRL) and its subsidiaries, Patriot Rail Holdings LLC (PRH) and...

  17. 78 FR 3425 - Filiquarian Publishing, LLC; Choice Level, LLC; and Joshua Linsk; Analysis of Proposed Consent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-16

    ... FEDERAL TRADE COMMISSION [File No. 112 3195] Filiquarian Publishing, LLC; Choice Level, LLC; and Joshua Linsk; Analysis of Proposed Consent Order To Aid Public Comment AGENCY: Federal Trade Commission... approval, an agreement containing a consent order from Filiquarian Publishing, LLC; Choice Level, LLC; and...

  18. 78 FR 76610 - Sunshine Act Meeting Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-18

    ... Company. HYDRO H-1 P-13579-002, P-14491- FFP Qualified Hydro 14, 000. LLC, Western Minnesota Municipal Power Agency. H-2 P-2146-139 Alabama Power Company. CERTIFICATES C-1 CP13-477-000 Columbia Gas... System Operator, Inc./PJM Interconnection, L.L.C Seam. E-4 RM13-7-000 Protection System Maintenance...

  19. Astronaut Edwin Aldrin undergoes zero-gravity training aboard KC-135

    NASA Image and Video Library

    1969-07-15

    S69-39269 (10 July 1969) --- Astronaut Edwin E. Aldrin Jr., lunar module pilot of the Apollo 11 lunar landing mission, undergoes zero-gravity training aboard a U.S. Air Force KC-135 jet aircraft from nearby Patrick Air Force Base, Florida. Aldrin is wearing an Extravehicular Mobility Unit (EMU), the type of equipment which he will wear on the lunar surface.

  20. 78 FR 11928 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Instituting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ...-2012-58] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Instituting.... I. Introduction On October 26, 2012, the New York Stock Exchange LLC (``NYSE'') and NYSE MKT LLC... of the market, the Floor broker may liquidate or cover the position only pursuant to a new order...

  1. KC-135A Winglet Flight Flutter Program

    NASA Technical Reports Server (NTRS)

    Kehoe, M. W.

    1982-01-01

    The evaluation techniques, results and conclusions for the flight flutter testing conducted on a KC-135A airplane configured with and without winglets are discussed. Test results are presented for the critical symmetric and antisymmetric modes for a fuel distribution that consisted of 10,000 pounds in each wing main tank and empty reserve tanks. The results indicated that a lightly damped oscillation was experienced for a winglet configuration of a 0 deg cant and -4 deg incidence. The effects of cant and incidence angle variation on the critical modes are also discussed. Lightly damped oscillations were not encountered for any other winglet cant and incidence angles tested.

  2. Dual-band infrared (DBIR) imaging inspections of Boeing 737 and KC-135 aircraft panels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Del Grande, N.K.; Dolan, K.W.; Durbin, P.F.

    1993-08-27

    We apply dual-band infrared (DBIR) imaging as a dynamic thermal tomography tool for wide area inspection of a Boeing 737 aircraft, and several Boeing KC-135 aircraft panels. Our analyses are discussed in this report. After flash-heating the aircraft skin, we record synchronized DBIR images every 40 ms, from onset to 8 seconds after the heat flash. We analyze selective DBIR image ratios which enhance surface temperature contrast and remove surface-emissivity clutter (from dirt, dents, tape, markings, ink, sealants, uneven paint, paint stripper, exposed metal and roughness variations). The Boeing 737 and KC-135 aircraft fuselage panels have varying percent thickness lossesmore » from corrosion. We established the correlation of percent thickness loss with surface temperature rise (above ambient) for a partially corroded F-18 wing box structure and several aluminum reference panels. Based on this correlation, lap splice temperatures rise 1{degrees}C per 24 {plus_minus} 5 % material loss at 0.4 s after the heat flash. We show tables, charts and temperature maps of typical lap splice material losses for the riveted (and bonded) Boeing 737, and the riveted (but unbonded) Boeing KC-135. We map the fuselage composite thermal inertia, based on the (inverse) slope of the surface temperature versus inverse square root of time. Composite thermal inertia maps characterize shallow skin defects within the lap splice at early times (<0.3 s) and deeper skin defects within the lap splice at late times (>0.4 s). Late time composite thermal inertia maps depict where corrosion-related thickness losses occur. Lap splice sites on a typical Boeing KC-135 panel with low composite thermal inertia values had high skin-thickness losses from corrosion.« less

  3. Astronaut Catherine G. Coleman aboard KC-135 aircraft

    NASA Image and Video Library

    1994-01-10

    S94-26350 (10 Jan. 1994) --- Astronaut Catherine G. Coleman seems to enjoy the brief period of weightlessness she is sharing with fellow members of the 1992 class of astronauts. The weightless experience was afforded by a special parabolic pattern flown by NASA?s KC-135 ?zero gravity? aircraft. Left to right behind her are astronauts Michael E. Lopez-Alegria, Kevin R. Kregel and Winston E. Scott. EDITOR?S NOTE: Since this photograph was taken the four have been named to flights as follows: Kregel, STS-70; Scott, STS-72.

  4. 75 FR 49527 - Caps Visual Communications, LLC; Black Dot Group; Formerly Known as Caps Group Acquisition, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,195] Caps Visual Communications, LLC; Black Dot Group; Formerly Known as Caps Group Acquisition, LLC Chicago, IL; Amended... of Caps Visual Communications, LLC, Black Dot Group, formerly known as Caps Group Acquisition, LLC...

  5. KC-135 winglet flight results

    NASA Technical Reports Server (NTRS)

    Montoya, L. C.

    1981-01-01

    Three KC-135 winglet configurations were flight tested for cant/incidence angles of 15 deg/-4 deg, 15 deg/-2 deg, and 0 deg/-4 deg, as well as the basic wing. The flight results for the 15 deg/-4 deg and basic wing configurations confirm the wind tunnel predicted 7% incremental decrease in total drag at cruise conditions. The 15 deg/-4 configuration flight measured wing and winglet pressure distributions, loads, stability and control, flutter, and buffet also correlate well with predicted values. The only unexpected flight results as compared with analytical predictions is a flutter speed decrease for the 0 deg/-4 deg configuration. The 15 deg/-2 deg configuration results show essentially the same incremental drag reduction as the 15 deg/-4 deg configuration; however, the flight loads are approximately 30% higher for the 15 deg/-2 deg configuration. The drag data for the 0 deg/-4 deg configuration show only a flight drag reduction.

  6. 76 FR 56428 - Southern Cross Transmission LLC; Pattern Power Marketing LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TX11-1-000] Southern Cross Transmission LLC; Pattern Power Marketing LLC; Notice of Filing Take notice that on September 6, 2011, pursuant... Marketing LLC (PPM) jointly filed an application requesting that the Commission direct (1) the City of...

  7. Pulmonary function in microgravity: KC-135 experience

    NASA Technical Reports Server (NTRS)

    Guy, Harold J.; Prisk, G. K.

    1991-01-01

    We have commenced a KC-135 program that parallels and proceeds our Spacelab (SLS-1) pulmonary function experiment. Our first task was to elucidate the affect of normal gravitation on the shape of the maximum expiratory flow volume (MEFV) curve. Nine normal subjects performed multiple MEFV maneuvers at 0-G, 1-G, and approximately 1.7-G. The MEFV curves for each subject were filtered, aligned at RV, and ensemble-averaged to produce an average MEFV curve for each state, allowing differences to be studied. Most subjects showed a decrease in the FVC at 0-G, which we attribute to an increased intrathoracic blood volume. In most of these subjects, the mean lung volume associated with a given flow was lower at 0-G, over about the upper half of the vital capacity. This is similar to the change previously reported during heat out immersion and is consistent with the known affect of engorgement of the lung with blood, on elastic recoil. There were also consistent but highly individual changes in the position and magnitude of detailed features of the curve, the individual patterns being similar to those previously reported on transition from the erect to the supine position. This supports the idea that the location and motion of choke points which determine the detailed individual configuration of MEFV curves, can be significantly influenced by gravitational forces, presumably via the effects of change in longitudinal tension on local airway pressure-diameter behavior and wave speed. We have developed a flight mass spectrometer and have commenced a study of single breath gradients in gas exchange, inert gas washouts, and rebreathing cardiac outputs and lung volumes at 0-G, 1-G, and 1.7-G. Comparison of our results with those from SLS-1 should identify the opportunities and limitations of the KC-135 as an accessible microgravity resource.

  8. Kansas City Transportation and Local-Scale Air Quality Study (KC-TRAQS) Fact Sheet

    EPA Pesticide Factsheets

    In fall 2017, the U.S. Environmental Protection Agency (EPA) launched the Kansas City Transportation Local-Scale Air Quality Study (KC-TRAQS) to learn more about local community air quality in three neighborhoods in Kansas City, KS.

  9. 75 FR 41895 - Inteva Products, LLC Adrian, Michigan; Inteva Products, LLC Troy, Michigan; Amended Certification...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... Products, LLC Adrian, Michigan; Inteva Products, LLC Troy, Michigan; Amended Certification Regarding... time period at the Troy, Michigan location of Inteva Products, LLC. The Troy, Michigan location.... Accordingly, the Department is amending the certification to include workers of the Troy, Michigan location of...

  10. 76 FR 78641 - Cedar Creek Wind Energy, LLC, Milford Wind Corridor Phase I, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RC11-1-002; Docket No. RC11-2-002] Cedar Creek Wind Energy, LLC, Milford Wind Corridor Phase I, LLC; Notice of Filing Take...) June 16, 2011 Order.\\1\\ \\1\\ Cedar Creek Wind Energy, LLC and Milford Wind Corridor Phase I, LLC, 135...

  11. 77 FR 60981 - TGP Granada, LLC and Roosevelt Wind Ranch, LLC v. Public Service Company of New Mexico, Tortoise...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ...; EL12-43-000, EL12-43-001 TGP Granada, LLC and Roosevelt Wind Ranch, LLC v. Public Service Company of New Mexico, Tortoise Capital Resources Corp.; TGP Granada, LLC and Roosevelt Wind Ranch, LLC; Notice... over capacity on the Eastern Interconnection Project. \\1\\ TGP Granada, LLC v. Pub. Serv. Co. of New...

  12. 75 FR 34170 - Plastic Omnium Automotive Exteriors, LLC, Anderson, SC; Plastic Omnium Automotive Exteriors, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... Omnium Automotive Exteriors, LLC, Anderson, SC; Plastic Omnium Automotive Exteriors, LLC, Troy, MI... the Anderson, South Carolina location of Plastic Omnium Automotive Exteriors, LLC, working out of Troy... certification to include workers in support of the Anderson, South Carolina facility working out of Troy...

  13. 75 FR 12230 - Black Oak Energy, L.L.C., EPIC Merchant Energy, LP, SESCO Enterprises, LLC v. PJM Interconnection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... Energy, L.L.C., EPIC Merchant Energy, LP, SESCO Enterprises, LLC v. PJM Interconnection, L.L.C.; Notice of Filing March 8, 2010. Take notice that on March 1, 2010, PJM Interconnection, L.L.C. filed a..., Order Accepting Compliance filing issued in this proceeding, Black Oak Energy, L.L.C., et al. v. PJM...

  14. Carrington Real Estate Services, LLC and Carrington Mortgage Services, LLC Information Sheet

    EPA Pesticide Factsheets

    Carrington Real Estate Services, LLC and Carrington Mortgage Services, LLC (the Company) is located in Anaheim, California. The settlement involves the sale of properties constructed prior to 1978, located in Bakersfield and Ridgecrest, California.

  15. 75 FR 56085 - Michigan Consolidated Gas Company; Enterprise Texas Pipeline LLC; Enogex LLC; Public Service...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... Storage and Transportation, L.P.; Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Baseline Filings...; (Not Consolidated)] Michigan Consolidated Gas Company; Enterprise Texas Pipeline LLC; Enogex LLC... Gas Policy Act of 1978 (NGPA). Any person desiring to participate in this rate proceeding must file a...

  16. 78 FR 62344 - Sabine Pass Liquefaction Expansion, LLC, Sabine Pass Liquefaction, LLC, and Sabine Pass LNG, L.P...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-18

    .... CP13-553-000] Sabine Pass Liquefaction Expansion, LLC, Sabine Pass Liquefaction, LLC, and Sabine Pass... 30, 2013, Sabine Pass Liquefaction Expansion, LLC, Sabine Pass Liquefaction, LLC, and Sabine Pass LNG, L.P. (collectively referred to as Sabine Pass) filed with the Federal Energy Regulatory Commission...

  17. 75 FR 14437 - North Eastern Wisconsin Hydro Inc. (N.E.W. Hydro); Notice of Intent To File License Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... Wisconsin Hydro Inc. (N.E.W. Hydro); Notice of Intent To File License Application, Filing of Pre-Application..., Inc. (N.E.W. Hydro) e. Name of Project: Menominee/Park Mill Hydroelectric Project. f. Location: The..., (202) 502-6156 or by e-mail at [email protected] . j. N.E.W. Hydro filed its request to use the...

  18. Discontinuous pore fluid distribution under microgravity--KC-135 flight investigations

    NASA Technical Reports Server (NTRS)

    Reddi, Lakshmi N.; Xiao, Ming; Steinberg, Susan L.

    2005-01-01

    Designing a reliable plant growth system for crop production in space requires the understanding of pore fluid distribution in porous media under microgravity. The objective of this experimental investigation, which was conducted aboard NASA KC-135 reduced gravity flight, is to study possible particle separation and the distribution of discontinuous wetting fluid in porous media under microgravity. KC-135 aircraft provided gravity conditions of 1, 1.8, and 10(-2) g. Glass beads of a known size distribution were used as porous media; and Hexadecane, a petroleum compound immiscible with and lighter than water, was used as wetting fluid at residual saturation. Nitrogen freezer was used to solidify the discontinuous Hexadecane ganglia in glass beads to preserve the ganglia size changes during different gravity conditions, so that the blob-size distributions (BSDs) could be measured after flight. It was concluded from this study that microgravity has little effect on the size distribution of pore fluid blobs corresponding to residual saturation of wetting fluids in porous media. The blobs showed no noticeable breakup or coalescence during microgravity. However, based on the increase in bulk volume of samples due to particle separation under microgravity, groups of particles, within which pore fluid blobs were encapsulated, appeared to have rearranged themselves under microgravity.

  19. 78 FR 70297 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    .... Applicants: Black Bear Hydro Partners, LLC, Black Bear Development Holdings, LLC, Black Bear SO, LLC, Black Bear Holding LLC. Description: Joint Application for Authorization Under Section 203 of Black Bear...: 20131114-5164. Comments Due: 5 p.m. ET 12/5/13. Docket Numbers: ER14-407-000. Applicants: Capacity Markets...

  20. 75 FR 16449 - Central Transmission, LLC v. PJM Interconnection L.L.C.; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-52-000] Central Transmission, LLC v. PJM Interconnection L.L.C.; Notice of Complaint March 26, 2010. Take notice that on March... Interconnection L.L.C. (PJM) pursuant to section 206 of the Federal Power Act (FPA), alleging that Schedule 6 of...

  1. Pyridine-2,6-Bis(Thiocarboxylic Acid) Produced by Pseudomonas stutzeri KC Reduces and Precipitates Selenium and Tellurium Oxyanions

    PubMed Central

    Zawadzka, Anna M.; Crawford, Ronald L.; Paszczynski, Andrzej J.

    2006-01-01

    The siderophore of Pseudomonas stutzeri KC, pyridine-2,6-bis(thiocarboxylic acid) (pdtc), is shown to detoxify selenium and tellurium oxyanions in bacterial cultures. A mechanism for pdtc's detoxification of tellurite and selenite is proposed. The mechanism is based upon determination using mass spectrometry and energy-dispersive X-ray spectrometry of the chemical structures of compounds formed during initial reactions of tellurite and selenite with pdtc. Selenite and tellurite are reduced by pdtc or its hydrolysis product H2S, forming zero-valent pdtc selenides and pdtc tellurides that precipitate from solution. These insoluble compounds then hydrolyze, releasing nanometer-sized particles of elemental selenium or tellurium. Electron microscopy studies showed both extracellular precipitation and internal deposition of these metalloids by bacterial cells. The precipitates formed with synthetic pdtc were similar to those formed in pdtc-producing cultures of P. stutzeri KC. Culture filtrates of P. stutzeri KC containing pdtc were also active in removing selenite and precipitating elemental selenium and tellurium. The pdtc-producing wild-type strain KC conferred higher tolerance against selenite and tellurite toxicity than a pdtc-negative mutant strain, CTN1. These observations support the hypothesis that pdtc not only functions as a siderophore but also is involved in an initial line of defense against toxicity from various metals and metalloids. PMID:16672449

  2. Hydro-Quebec is at it again

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamilton, G.

    1993-12-31

    When New York governor Mario Cuomo pulled the plug on a purchase of 1,000 megawatts of power from Hydro-Quebec last June, the provincial utility talked tough. The cancellation, a senior Hydro-Quebec official claimed, would not jeopardize the future of its controversial Great Whale hydro project in the North. Bu Hydro-Quebec has quietly shoved Great Whale onto the back burner while an environmental review is underway. In the meantime the utility is barreling ahead with another mega-dam. The Ste. Marquerite project planned for north-eastern Quebec is modest by Hydro-Quebec standards, generating less than a third the power of Great Whale. Still,more » with an 880-megawatt power station and 190 square miles of reservoirs, it is one of the largest hydro projects on any drawing board in North America. Environmentalists say it is being pushed ahead without a serious study of its impacts. This article details the environmental impacts of the project, and the extended impacts, not yet accounted for.« less

  3. 77 FR 27763 - Quantum Choctaw Power, LLC, USG Nevada LLC, et al.; Notice of Effectiveness of Exempt Wholesale...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG12-31-000; EG12-32-000; et al.] Quantum Choctaw Power, LLC, USG Nevada LLC, et al.; Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Quantum Choctaw Power, LLC EG12-31-000 USG Nevada LLC EG12-32-000...

  4. 77 FR 2287 - FFP Project 6, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 12848-002 and 14081-000] FFP Project 6, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit... Orleans, in Orleans Parish, Louisiana. The applications were filed by FFP Project 6, LLC for Project No...

  5. 77 FR 63874 - Birds Eye Foods, LLC; Fulton, NY Plant; A Wholly-Owned Subsidiary of Pinnacle Foods Group LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-81,009] Birds Eye Foods, LLC... workers of Birds Eye Foods, LLC, Fulton, NY Plant, a wholly-owned subsidiary of Pinnacle Foods Group LLC... Eye Foods, LLC. The Department has determined that these workers were sufficiently under the control...

  6. Effects of medium and trace metals on kinetics of carbon tetrachloride transformation by Pseudomonas sp. strain KC.

    PubMed Central

    Tatara, G M; Dybas, M J; Criddle, C S

    1993-01-01

    Under denitrifying conditions, Pseudomonas sp. strain KC transforms carbon tetrachloride (CT) to carbon dioxide via a complex but as yet undetermined mechanism. Transformation rates were first order with respect to CT concentration over the CT concentration range examined (0 to 100 micrograms/liter) and proportional to protein concentration, giving pseudo-second-order kinetics overall. Addition of ferric iron (1 to 20 microM) to an actively transforming culture inhibited CT transformation, and the degree of inhibition increased with increasing iron concentration. By removing iron from the trace metals solution or by removing iron-containing precipitate from the growth medium, higher second-order rate coefficients were obtained. Copper also plays a role in CT transformation. Copper was toxic at neutral pH. By adjusting the medium pH to 8.2, soluble iron and copper levels decreased as a precipitate formed, and CT transformation rates increased. However, cultures grown at high pH without any added trace copper (1 microM) exhibited slower growth rates and greatly reduced rates of CT transformation, indicating that copper is required for CT transformation. The use of pH adjustment to decrease iron solubility, to avoid copper toxicity, and to provide a selective advantage for strain KC was evaluated by using soil slurries and groundwater containing high levels of iron. In samples adjusted to pH 8.2 and inoculated with strain KC, CT disappeared rapidly in the absence or presence of acetate or nitrate supplements. CT did not disappear in pH-adjusted controls that were not inoculated with strain KC. PMID:8357248

  7. 75 FR 20389 - Chrysler Group LLC, Formerly Known as Chrysler LLC, Warren Office Building, Including On-Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-19

    ... certification to include workers leased from Product Action International, LLC working on-site at the Warren..., Formerly Known as Chrysler LLC, Warren Office Building, Including On-Site Leased Workers from Product Action International, LLC, Warren, Michigan; Amended Certification Regarding Eligibility To Apply for...

  8. 76 FR 12954 - PPL EnergyPlus, LLC v. PJM Interconnection, L.L.C.; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-25-000] PPL EnergyPlus, LLC v. PJM Interconnection, L.L.C.; Notice of Complaint Take notice that on March 2, 2011, PPL Energy... Interconnection, L.L.C. (PJM or Respondent), alleging that PJM failed to conduct its annual financial transmission...

  9. 77 FR 2290 - FFP Project 18, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    .... 14073-000] FFP Project 18, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary... Parish, Louisiana. The applications were filed by FFP Project 18, LLC for Project No. 12857-002, and.... on the next regular business day. 18 CFR 385.2001(a)(2) (2011). On January 17, 2012, at 9 a.m...

  10. 78 FR 55693 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC13-143-000. Applicants: Seneca Generation, LLC, Lake Lynn Generation, LLC, All Dams Generation, LLC, PE Hydro Generation...

  11. Air Force KC-X Tanker Aircraft Program: Background and Issues for Congress

    DTIC Science & Technology

    2009-10-05

    General ..................................................................................................................... 12 Best Value vs . Lowest...Druyan was a single “bad apple ” and that her actions did not negate the merits of leasing Boeing 767s for use as tankers. In February 2005, however...Force KC-X Tanker Aircraft Program: Background and Issues for Congress Congressional Research Service 17 Best Value vs . Lowest Cost The question of

  12. 78 FR 5798 - Grouse Creek Wind Park, LLC, Grouse Creek Wind Park II, LLC; Notice of Petition for Enforcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. El13-39-000, QF11-32-001, QF11-33-001] Grouse Creek Wind Park, LLC, Grouse Creek Wind Park II, LLC; Notice of Petition for... Policies Act of 1978 (PURPA), Grouse Creek Wind Park, LLC and Grouse Creek Wind Park II, LLC filed a...

  13. 78 FR 34091 - Wausau Paper Mills, LLC; Specialty Papers Acquisition, LLC; Notice of Application for Transfer of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 2161-034; 2207-045] Wausau Paper Mills, LLC; Specialty Papers Acquisition, LLC; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions To Intervene On April 22, 2013, Wausau Paper Mills, LLC (transferor) and...

  14. 77 FR 34031 - Petal Gas Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Application Take notice that on May 21, 2012, Petal Gas Storage, L.L.C. (Petal) and Hattiesburg Industrial Gas Sales, L.L.C. (Hattiesburg... pursuant to sections 7(c) and 7(b) of the Natural Gas Act (NGA), for authorization for Petal to acquire the...

  15. 78 FR 48469 - Notice of Determinations Regarding Eligibility To Apply for Worker Adjustment Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... & Associates. MN. 82,784 The Harte-Hanks Direct Marketing/ Shawnee, KS June 5, 2012. KC, LLC, Call Center... Pawtucket, RI......... June 7, 2012. Division, Aquent, Atterro, dba Digital People, etc. 82,800 Osram...

  16. 76 FR 13667 - Chrysler Group LLC; Formerly Known as Chrysler LLC; Kenosha Engine Plant; Including On-Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ...; Formerly Known as Chrysler LLC; Kenosha Engine Plant; Including On-Site Leased Workers From Caravan Knight..., K+S Services, Inc., G4S Secure Solutions, Crassociates, Inc., CES, INC., Evans Distribution Systems... of Chrysler Group, LLC, formerly known as Chrysler, LLC, Kenosha Engine Plant, Kenosha, Wisconsin...

  17. 75 FR 24747 - SCI, LLC/Zener-Rectifier Operations Division A Wholly Owned Subsidiary of SCI, LLC/ON...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-70,235] SCI, LLC/Zener-Rectifier... Adjustment Assistance on October 19, 2009, applicable to workers of SCI LLC/Zener-Rectifier, Operations... Technical Resources were employed on-site at the Phoenix Arizona location of SCI LLC/Zener-Rectifier...

  18. PES Holdings, LLC, et. al. Bankruptcy Renewable Fuel Standard Settlement

    EPA Pesticide Factsheets

    PES Holdings, LLC, North Yard Financing, LLC, North Yard GP, LLC, North Yard Logistics, L.P., PES Administrative Services, LLC, PES Logistics GP, LLC, PES Logistics Partners, L.P., Philadelphia Energy Solutions Refining and Marketing LLC (PESRM),

  19. 75 FR 5780 - Green Borders Geothermal, LLC, Complainant, v. Terra-Gen Dixie Valley, LLC, Respondent; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-36-000] Green Borders Geothermal, LLC, Complainant, v. Terra-Gen Dixie Valley, LLC, Respondent; Notice of Complaint January 28, 2010. Take notice that on January 25, 2010, Green Borders Geothermal, LLC (Green Borders) filed a formal complaint against Terra-Gen Dixie Valle...

  20. Determination of actual crop evapotranspiration (ETc) and dual crop coefficients (Kc) for cotton, wheat and maize in Fergana Valley: integration of the FAO-56 approach and BUDGET

    NASA Astrophysics Data System (ADS)

    Kenjabaev, Shavkat; Dernedde, Yvonne; Frede, Hans-Georg; Stulina, Galina

    2014-05-01

    Determination of the actual crop evapotranspiration (ETc) during the growing period is important for accurate irrigation scheduling in arid and semi-arid regions. Development of a crop coefficient (Kc) can enhance ETc estimations in relation to specific crop phenological development. This research was conducted to determine daily and growth-stage-specific Kc and ETc values for cotton (Gossypium hirsutum L.), winter wheat (Triticum aestivum L.) and maize (Zea mays L.) for silage at fields in Fergana Valley (Uzbekistan). The soil water balance model - Budget with integration of the dual crop procedure of the FAO-56 was used to estimate the ETc and separate it into evaporation (Ec) and transpiration (Tc) components. An empirical equation was developed to determine the daily Kc values based on the estimated Ec and Tc. The ETc, Kc determination and comparison to existing FAO Kc values were performed based on 10, 5 and 6 study cases for cotton, wheat and maize, respectively. Mean seasonal amounts of crop water consumption in terms of ETc were 560±50, 509±27 and 243±39 mm for cotton, wheat and maize, respectively. The growth-stage-specific Kc for cotton, wheat and maize was 0.15, 0.27 and 0.11 at initial; 1.15, 1.03 and 0.56 at mid; and 0.45, 0.89 and 0.53 at late season stages. These values correspond to those reported by the FAO-56. Development of site specific Kc helps tremendously in irrigation management and furthermore provides precise water applications in the region. The developed simple approach to estimate daily Kc for the three main crops grown in the Fergana region was a first attempt to meet this issue. Keywords: Actual crop evapotranspiration, evaporation and transpiration, crop coefficient, model BUDGET, Fergana Valley.

  1. Evapotranspiration and crop coefficients for a super intensive olive orchard. An application of SIMDualKc and METRIC models using ground and satellite observations

    NASA Astrophysics Data System (ADS)

    Paço, Teresa A.; Pôças, Isabel; Cunha, Mário; Silvestre, José C.; Santos, Francisco L.; Paredes, Paula; Pereira, Luís S.

    2014-11-01

    The estimation of crop evapotranspiration (ETc) from the reference evapotranspiration (ETo) and a standard crop coefficient (Kc) in olive orchards requires that the latter be adjusted to planting density and height. The use of the dual Kc approach may be the best solution because the basal crop coefficient Kcb represents plant transpiration and the evaporation coefficient reproduces the soil coverage conditions and the frequency of wettings. To support related computations for a super intensive olive orchard, the model SIMDualKc was adopted because it uses the dual Kc approach. Alternatively, to consider the physical characteristics of the vegetation, the satellite-based surface energy balance model METRIC™ - Mapping EvapoTranspiration at high Resolution using Internalized Calibration - was used to estimate ETc and to derive crop coefficients. Both approaches were compared in this study. SIMDualKc model was calibrated and validated using sap-flow measurements of the transpiration for 2011 and 2012. In addition, eddy covariance estimation of ETc was also used. In the current study, METRIC™ was applied to Landsat images from 2011 to 2012. Adaptations for incomplete cover woody crops were required to parameterize METRIC. It was observed that ETc obtained from both approaches was similar and that crop coefficients derived from both models showed similar patterns throughout the year. Although the two models use distinct approaches, their results are comparable and they are complementary in spatial and temporal scales.

  2. 78 FR 4842 - Linden VFT, LLC v. Brookfield Energy Marketing, LP, Cargill Power Markets, LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-40-000] Linden VFT, LLC v. Brookfield Energy Marketing, LP, Cargill Power Markets, LLC; Notice of Complaint Take notice that... Brookfield Energy Marketing, LP and Cargill Power Markets, LLC (Respondents) alleging that, Respondents...

  3. 75 FR 76041 - Chrysler Group LLC Formerly Known as Chrysler LLC Kenosha Engine Plant Including On-Site Leased...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... Formerly Known as Chrysler LLC Kenosha Engine Plant Including On-Site Leased Workers From Caravan Knight..., K+S Services, Inc., G4S Secure Solutions, Crassociates, Inc., CES, Inc., Evans Distribution Systems..., LLC, formerly known as Chrysler, LLC, Kenosha Engine Plant, Kenosha, Wisconsin (subject firm). The...

  4. 77 FR 36041 - Nevada 5, Inc. and Oakland Transportation Holdings LLC-Control Exemption-GTR Leasing LLC and US...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35635] Nevada 5, Inc. and Oakland Transportation Holdings LLC--Control Exemption--GTR Leasing LLC and US Rail Holdings LLC \\1\\ \\1... date of the exemption (30 days after the verified notice was filed). Applicants represent that: (1) The...

  5. Modifications to the rapid melt/rapid quench and transparent polymer video furnaces for the KC-135

    NASA Technical Reports Server (NTRS)

    Smith, Guy A.; Kosten, Sue E.; Workman, Gary L.

    1990-01-01

    Given here is a summary of tasks performed on two furnace systems, the Transparent Polymer (TPF) and the Rapid Melt/Rapid Quench (RMRQ) furnaces, to be used aboard NASA's KC-135. It was determined that major changes were needed for both furnaces to operate according to the scientific investigators' experiment parameters. Discussed here are what the problems were, what was required to solve the problems, and possible future enhancements. It was determined that the enhancements would be required for the furnaces to perform at their optimal levels. Services provided include hardware and software modifications, Safety DataPackage documentation, ground based testing, transportation to and from Ellington Air Field, operation of hardware during KC-135 flights, and post-flight data processing.

  6. 76 FR 45248 - PJM Interconnection, L.L.C., PJM Power Providers Group v. PJM Interconnection, L.L.C...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ...-002; Docket No. EL11-20-001] PJM Interconnection, L.L.C., PJM Power Providers Group v. PJM Interconnection, L.L.C.; Supplemental Notice of Staff Technical Conference On June 13, 2011, the Commission issued... Resources Services, Inc., Maryland Public Service Commission, Monitoring Analytics, L.L.C., National Rural...

  7. Effect of PAR-2 Deficiency in Mice on KC Expression after Intratracheal LPS Administration

    PubMed Central

    Williams, Julie C.; Lee, Rebecca D.; Doerschuk, Claire M.; Mackman, Nigel

    2011-01-01

    Protease activated receptors (PAR) have been shown to play a role in inflammation. PAR-2 is expressed by numerous cells in the lung and has either proinflammatory, anti-inflammatory, or no effect depending on the model. Here, we examined the role of PAR-2 in a model of LPS-induced lung inflammation. We found that PAR-2-deficient mice had significantly less KC expression in bronchial lavage fluid compared with wild-type mice but there was no difference in MIP-2 or TNF-α expression. We also found that isolated alveolar and resident peritoneal macrophages lacking PAR-2 showed a similar deficit in KC after LPS stimulation without differences in MIP-2 or TNF-α. Infiltration of neutrophils and macrophages into the lung following LPS administration was not affected by an absence of PAR-2. Our results support the notion that PAR-2 plays a role in LPS activation of TLR4 signaling in macrophages. PMID:22175012

  8. Effect of PAR-2 Deficiency in Mice on KC Expression after Intratracheal LPS Administration.

    PubMed

    Williams, Julie C; Lee, Rebecca D; Doerschuk, Claire M; Mackman, Nigel

    2011-01-01

    Protease activated receptors (PAR) have been shown to play a role in inflammation. PAR-2 is expressed by numerous cells in the lung and has either proinflammatory, anti-inflammatory, or no effect depending on the model. Here, we examined the role of PAR-2 in a model of LPS-induced lung inflammation. We found that PAR-2-deficient mice had significantly less KC expression in bronchial lavage fluid compared with wild-type mice but there was no difference in MIP-2 or TNF-α expression. We also found that isolated alveolar and resident peritoneal macrophages lacking PAR-2 showed a similar deficit in KC after LPS stimulation without differences in MIP-2 or TNF-α. Infiltration of neutrophils and macrophages into the lung following LPS administration was not affected by an absence of PAR-2. Our results support the notion that PAR-2 plays a role in LPS activation of TLR4 signaling in macrophages.

  9. 77 FR 70434 - Petal Gas Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Offer of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-464-000] Petal Gas Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Offer of Settlement Take notice that on November 8, 2012, Petal Gas Storage, L.L.C. (Petal) and Hattiesburg Industrial Gas Sales, L.L.C...

  10. Comparing the Effectiveness of Two KC-10 Concepts of Operation - An Examination of Tanker/Airlift Support in a Fighter Deployment to Europe

    DTIC Science & Technology

    1986-06-01

    PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION (Ii’ ppticable) Sc. ADDRESS (City, State and ZIP Code) 10. SOURCE OF FUNDING NOS...total of 60 KC-10s were available to support the fighter deployment. This number represented the projected KC-10 procurement for the year 1990 as...search for relevant government studies was accomplished through the Defense Technical Information Center (DTIC). All their 3-9 research related to

  11. 77 FR 39695 - HollyFrontier Refining and Marketing LLC v. Osage Pipe Line Company, LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12-21-000] HollyFrontier Refining and Marketing LLC v. Osage Pipe Line Company, LLC; Notice of Complaint Take notice that on June 25...; 18 CFR 343.1(a) and 343.2(c), HollyFrontier Refining and Marketing LLC (Complainant) filed a formal...

  12. A multioutput LLC-type parallel resonant converter

    NASA Astrophysics Data System (ADS)

    Liu, Rui; Lee, C. Q.; Upadhyay, Anand K.

    1992-07-01

    When an LLC-type parallel resonant converter (LLC-PRC) operates above resonant frequency, the switching transistors can be turned off at zero voltage. Further study reveals that the LLC-PRC possesses the advantage of lower converter voltage gain as compared with the conventional PRC. Based on analytic results, a complete set of design curves is obtained, from which a systematic design procedure is developed. Experimental results from a 150 W 150 kHz multioutput LLC-type PRC power supply are presented.

  13. 77 FR 47670 - RG Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,919] RG Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG Steel LLC, Including All On-Site Leased Workers, Sparrows Point, MD; Amended Certification Regarding Eligibility To Apply for...

  14. Molecular beam electric resonance study of KCN, K 13CN and KC 15N

    NASA Astrophysics Data System (ADS)

    van Vaals, J. J.; Leo Meerts, W.; Dymanus, A.

    1984-08-01

    The microwave spectra of the isotopic species K 13CN and KC 15N have been investigated by molecular beam electric resonance spectroscopy, using the seeded beam technique. For both isotopic species about 20 rotational transitions originating in the ground vibrational state were observed in the frequency range 9-38 GHz. The observed transitions were fitted to an asymmetric rotor model to determine the three rotational, as well as the five quartic and three sextic centrifugal distortion constants. The hyperfine spectrum of KCN has been unravelled with the help of microwave-microwave double-resonance techniques. One hundred and forty hyperfine transitions in 11 rotational transitions have been assigned. The hyperfine structures of K 13CN and KC 15N were also studied. For all three isotopic species the quadrupole coupling constants and some spin-rotation coupling constants could be deduced. The rotational constants of the 13C and 15N isotopically substituted species of potassium cyanide, combined with those of the normal isotopic species (determined more accurately in this work), allowed an accurate and unambiguous evaluation of the structure, which was confirmed to be T shaped. Both the effective structure of the ground vibrational state and the substitution structure were evaluated. The results for the effective structural parameters are r CN = 1.169(3) Å, r KC = 2.716(9) Å, and r KN = 2.549(9) Å. The values obtained for the principal hyperfine coupling constant eQqz(N), the angle between the CN axis and zN, and the bond length rCN indicate that in gaseous potassium cyanide the CN group can be considered as an almost unperturbed CN - ion.

  15. 78 FR 36017 - MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-Operation Exemption-Hilco SP Rail, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35725] MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-- Operation Exemption--Hilco SP Rail, LLC MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad (MCM), a noncarrier, has filed a verified notice of exemption...

  16. 77 FR 42831 - Professional Transportation, Inc.-Asset Acquisition-CUSA ES, LLC and CUSA CSS, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. MCF 21046] Professional Transportation, Inc.--Asset Acquisition--CUSA ES, LLC and CUSA CSS, LLC AGENCY: Surface Transportation Board, Department of Transportation. ACTION: Correction to Notice of Finance Application. On June 29, 2012, notice...

  17. 75 FR 11916 - Chrysler Group LLC, Formerly Known as Chrysler LLC, Conner Avenue Assembly Plant, Including On...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ..., CDI, Syncreon and Caravan Knight Facilities Management LLC; Detriot, MI; Amended Certification... workers from Aerotek, CDI, Syncreon and Caravan Knight Facilities Management LLC, Detroit, Michigan, who...

  18. Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huertas-Hernando, Daniel; Farahmand, Hossein; Holttinen, Hannele

    2016-06-20

    Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as wellmore » as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.« less

  19. 76 FR 46793 - PJM Interconnection, L.L.C.; PJM Power Providers Group v. PJM Interconnection, L.L.C.; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ...-002; Docket No. EL11-20-001] PJM Interconnection, L.L.C.; PJM Power Providers Group v. PJM Interconnection, L.L.C.; Notice Establishing Post-Technical Comment Period As indicated in the June 29, 2011... issues related to PJM Interconnection, L.L.C. (PJM)'s Minimum Offer Price Rule (MOPR) and resources...

  20. STS-45 crewmembers during zero gravity activities onboard KC-135 NASA 930

    NASA Image and Video Library

    1991-08-21

    S91-44453 (21 Aug 1991) --- The crew of STS-45 is already training for its March 1992 mission, including stints on the KC-135 zero-gravity-simulating aircraft. Shown with an inflatable globe are, clockwise from the top, C. Michael Foale, mission specialist; Dirk Frimout, payload specialist; Brian Duffy, pilot; Charles R. (Rick) Chappell, backup payload specialist; Charles F. Bolden, mission commander; Byron K. Lichtenberg, payload specialist; and Kathryn D. Sullivan, payload commander.

  1. 77 FR 70478 - RG Steel Wheeling, LLC, Wheeling Office, A Division Of RG Steel, LLC, Including On-Site Leased...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-81,880: TA-A-81,880A] RG Steel Wheeling, LLC, Wheeling Office, A Division Of RG Steel, LLC, Including On-Site Leased Workers From Pro Unlimited and Green Energy Initiatives LLC, Including Workers Whose Wages Were Reported Through Severstal Wheeling, Wheeling, WV: Mountain State...

  2. 75 FR 60138 - Chrysler Financial Services Americas, LLC, a Subsidiary of Finco Intermediate Holding Co., LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-73,458] Chrysler Financial Services Americas, LLC, a Subsidiary of Finco Intermediate Holding Co., LLC, Troy Customer Contact Center, Troy, Michigan; Notice of Affirmative Determination Regarding Application for Reconsideration By...

  3. HydroTrop

    NASA Image and Video Library

    2010-10-18

    ISS025-E-007772 (18 Oct. 2010) --- NASA astronaut Shannon Walker, Expedition 25 flight engineer, works with the Japan Aerospace Exploration Agency (JAXA) experiment HydroTropi (Hydrotropism & Auxin-Inducible Gene Expression in Roots Grown under Microgravity Conditions) in the Kibo laboratory of the International Space Station.

  4. HydroTrop

    NASA Image and Video Library

    2010-10-18

    ISS025-E-007774 (18 Oct. 2010) --- NASA astronaut Shannon Walker, Expedition 25 flight engineer, works with the Japan Aerospace Exploration Agency (JAXA) experiment HydroTropi (Hydrotropism & Auxin-Inducible Gene Expression in Roots Grown under Microgravity Conditions) in the Kibo laboratory of the International Space Station.

  5. HydroTrop

    NASA Image and Video Library

    2010-10-18

    ISS025-E-007780 (18 Oct. 2010) --- NASA astronaut Shannon Walker, Expedition 25 flight engineer, works with the Japan Aerospace Exploration Agency (JAXA) experiment HydroTropi (Hydrotropism & Auxin-Inducible Gene Expression in Roots Grown under Microgravity Conditions) in the Kibo laboratory of the International Space Station.

  6. The triterpenoid CDDO-imidazolide reduces immune cell infiltration and cytokine secretion in the KrasG12D;Pdx1-Cre (KC) mouse model of pancreatic cancer

    PubMed Central

    Leal, Ana S.; Sporn, Michael B.; Pioli, Patricia A.; Liby, Karen T.

    2016-01-01

    Because the 5-year survival rate for pancreatic cancer remains under 10%, new drugs are needed for the prevention and treatment of this devastating disease. Patients with chronic pancreatitis have a 12-fold higher risk of developing pancreatic cancer. LSL-KrasG12D/+;Pdx-1-Cre (KC) mice replicate the genetics, symptoms and histopathology found in human pancreatic cancer. Immune cells infiltrate into the pancreas of these mice and produce inflammatory cytokines that promote tumor growth. KC mice are particularly sensitive to the effects of lipopolysaccharide (LPS), as only 48% of KC mice survived an LPS challenge while 100% of wildtype (WT) mice survived. LPS also increased the percentage of CD45+ immune cells in the pancreas and immunosuppressive Gr1+ myeloid-derived suppressor cell in the spleen of these mice. The triterpenoid CDDO-imidazolide (CDDO-Im) not only reduced the lethal effects of LPS (71% survival) but also decreased the infiltration of CD45+ cells into the pancreas and the percentage of Gr1+ myeloid-derived suppressor cell in the spleen of KC mice 4–8 weeks after the initial LPS challenge. While the levels of inflammatory cytokine levels were markedly higher in KC mice versus WT mice challenged with LPS, CDDO-Im significantly decreased the production of IL-6, CCL-2, vascular endothelial growth factor and G-CSF in the KC mice. All of these cytokines are prognostic markers in pancreatic cancer or play important roles in the progression of this disease. Disrupting the inflammatory process with drugs such as CDDO-Im might be useful for preventing pancreatic cancer, especially in high-risk populations. PMID:27659181

  7. KC-135 materials handling robotics

    NASA Technical Reports Server (NTRS)

    Workman, Gary L.

    1991-01-01

    Robot dynamics and control will become an important issue for implementing productive platforms in space. Robotic operations will become necessary for man-tended stations and for efficient performance of routine operations in a manned platform. The current constraints on the use of robotic devices in a microgravity environment appears to be due to an anticipated increase in acceleration levels due to manipulator motion and for safety concerns. The objective of this study will be to provide baseline data to meet that need. Most texts and papers dealing with the kinematics and dynamics of robots assume that the manipulator is composed of joints separated by rigid links. However, in recent years several groups have begun to study the dynamics of flexible manipulators, primarily for applying robots in space and for improving the efficiency and precision of robotic systems. Robotic systems which are being planned for implementation in space have a number of constraints to overcome. Additional concepts which have to be worked out in any robotic implementation for a space platform include teleoperation and degree of autonomous control. Some significant results in developing a robotic workcell for performing robotics research on the KC-135 aircraft in preperation for space-based robotics applications in the future were generated. In addition, it was shown that TREETOPS can be used to simulate the dynamics of robot manipulators for both space and ground-based applications.

  8. Working together to ensure safety at hydro projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartel, J.W.

    Providing for public safety around a hydroelectric facility can be critically important to the welfare of a hydro-power producer. With this in mind, Wisconsin Electric Power Company and Wisconsin Public Service Corporation have worked together to develop consistent safety signage and several for their hydro projects. Although the two utilities sometimes compete for electric customers, they cooperate to ensure the safety to those customers. Both WE and WPS took steps in 1986 to make their operations safer through involvement in the Wisconsin/Michigan Hydro User Group. The organization has 25 members-primarily of electric utilities and paper companies-who operate hydro facilities inmore » the two states. The two areas that the HUG studied in public safety were signs and warning systems. HUG established a sign committee to study how to increase safety of people around hydro plants through signs, explained Ted Handrick, hydro plant superintendent at WPS. The committee's recommendations led to development of a statewide uniform sign system adopted by all HUG members. The committee used Wisconsin Department of Natural Resources' guidelines for warning signs and portages in developing the signage standards. HUG members are converting to these new sign standards as they replace old signs and/or install new signs. Notices describing the new signage system have been placed near each hydro plant, at boat landings, and in campgrounds. The signs are mounted well above ground level so they can be seen and easily read by recreationalists. Warning systems, in accordance with HUG warning standards, were installed at WE and WPS hydro facilities. These systems alert nearby recreational users of rapid increases in water flow when generating units are turned on or when spillway gates are opened. Soon after the authors installed equipment to remotely operate its hydro facilities, the utility experienced a dramatic increase increase in intrusion on dams and other structures at the

  9. 78 FR 70029 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... Solutions Corporation, Green Valley Hydro, LLC, Jersey Central Power & Light, Metropolitan Edison Company...-000. Applicants: Florida Power & Light Company. Description: FPL NITSA No. 266 Reallocation of Trans...-364-000. Applicants: Blue Sky West, LLC. Description: Request for Limited Waiver and Expedited Action...

  10. 75 FR 69469 - Supermedia, LLC, Formerly Known as Idearc Media, LLC, a Subsidiary of Supermedia Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-12

    ... Known as Idearc Media, LLC, a Subsidiary of Supermedia Information Services, LLC, Troy, NY; Notice of... the findings that worker separations are not attributable to increased imports of articles like or directly competitive with telephone directories or a shift/acquisition of these articles to a foreign...

  11. 77 FR 76006 - Star Networks USA, LLC; Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... CONSUMER PRODUCT SAFETY COMMISSION [CPSC Docket No. 13-2] Star Networks USA, LLC; Complaint AGENCY.... Published below is a Complaint: In the Matter of Star Networks USA, LLC.\\1\\ \\1\\ Chairman Inez M. Tenenbaum... COMMISSION In the Matter of STAR NETWORKS USA, LLC, Respondent CPSC DOCKET NO. 13-2 COMPLAINT Nature of...

  12. 77 FR 26796 - HydroGenetics, Inc.; Order of Suspension of Trading

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... SECURITIES AND EXCHANGE COMMISSION [File No. 500-1] HydroGenetics, Inc.; Order of Suspension of... and accurate information concerning the securities of HydroGenetics, Inc. (``HydroGenetics'') because... require a suspension of trading in the securities of HydroGenetics. Therefore, it is ordered, pursuant to...

  13. The triterpenoid CDDO-imidazolide reduces immune cell infiltration and cytokine secretion in the KrasG12D;Pdx1-Cre (KC) mouse model of pancreatic cancer.

    PubMed

    Leal, Ana S; Sporn, Michael B; Pioli, Patricia A; Liby, Karen T

    2016-12-01

    Because the 5-year survival rate for pancreatic cancer remains under 10%, new drugs are needed for the prevention and treatment of this devastating disease. Patients with chronic pancreatitis have a 12-fold higher risk of developing pancreatic cancer. LSL-Kras G12D/+ ;Pdx-1-Cre (KC) mice replicate the genetics, symptoms and histopathology found in human pancreatic cancer. Immune cells infiltrate into the pancreas of these mice and produce inflammatory cytokines that promote tumor growth. KC mice are particularly sensitive to the effects of lipopolysaccharide (LPS), as only 48% of KC mice survived an LPS challenge while 100% of wildtype (WT) mice survived. LPS also increased the percentage of CD45+ immune cells in the pancreas and immunosuppressive Gr1+ myeloid-derived suppressor cell in the spleen of these mice. The triterpenoid CDDO-imidazolide (CDDO-Im) not only reduced the lethal effects of LPS (71% survival) but also decreased the infiltration of CD45+ cells into the pancreas and the percentage of Gr1+ myeloid-derived suppressor cell in the spleen of KC mice 4-8 weeks after the initial LPS challenge. While the levels of inflammatory cytokine levels were markedly higher in KC mice versus WT mice challenged with LPS, CDDO-Im significantly decreased the production of IL-6, CCL-2, vascular endothelial growth factor and G-CSF in the KC mice. All of these cytokines are prognostic markers in pancreatic cancer or play important roles in the progression of this disease. Disrupting the inflammatory process with drugs such as CDDO-Im might be useful for preventing pancreatic cancer, especially in high-risk populations. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  14. 78 FR 42988 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Approving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-18

    ...-2012-58] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Approving... Related Supplementary Material July 12, 2013. I. Introduction On October 26, 2012, the New York Stock... cover the position only pursuant to a new order, which must be time-recorded upstairs and upon receipt...

  15. 77 FR 43591 - Tri-State Financial Co., LLC, (d/b/a North Country Ethanol), Red River Energy, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-25

    ... Financial Co., LLC, (d/b/a North Country Ethanol), Red River Energy, LLC; Notice of Filing Take notice that on July 10, 2012, Tri-State Financial Co., LLC, d/ b/a North Country Ethanol (Tri-State), and Red... the Tri- State's ethanol facility near Rosholt, in Roberts County, South Dakota (the Delivery Line...

  16. 77 FR 44677 - RG Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... Leased Workers From Echelon Service Company, Sun Associated Industries, Inc., MPI Consultants LLC...-site leased workers from Echelon Service Company, Sun Associated Industries, Inc., MPI Consultants LLC...

  17. HydroSHEDS: A global comprehensive hydrographic dataset

    NASA Astrophysics Data System (ADS)

    Wickel, B. A.; Lehner, B.; Sindorf, N.

    2007-12-01

    The Hydrological data and maps based on SHuttle Elevation Derivatives at multiple Scales (HydroSHEDS) is an innovative product that, for the first time, provides hydrographic information in a consistent and comprehensive format for regional and global-scale applications. HydroSHEDS offers a suite of geo-referenced data sets, including stream networks, watershed boundaries, drainage directions, and ancillary data layers such as flow accumulations, distances, and river topology information. The goal of developing HydroSHEDS was to generate key data layers to support regional and global watershed analyses, hydrological modeling, and freshwater conservation planning at a quality, resolution and extent that had previously been unachievable. Available resolutions range from 3 arc-second (approx. 90 meters at the equator) to 5 minute (approx. 10 km at the equator) with seamless near-global extent. HydroSHEDS is derived from elevation data of the Shuttle Radar Topography Mission (SRTM) at 3 arc-second resolution. The original SRTM data have been hydrologically conditioned using a sequence of automated procedures. Existing methods of data improvement and newly developed algorithms have been applied, including void filling, filtering, stream burning, and upscaling techniques. Manual corrections were made where necessary. Preliminary quality assessments indicate that the accuracy of HydroSHEDS significantly exceeds that of existing global watershed and river maps. HydroSHEDS was developed by the Conservation Science Program of the World Wildlife Fund (WWF) in partnership with the U.S. Geological Survey (USGS), the International Centre for Tropical Agriculture (CIAT), The Nature Conservancy (TNC), and the Center for Environmental Systems Research (CESR) of the University of Kassel, Germany.

  18. 75 FR 34170 - Chrysler Group LLC, Formally Known as Chrysler LLC, Kenosha Engine Plant, Including On-Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... automobile engines. The company reports that workers leased from Caravan Knight Facilities Management, LLC..., Formally Known as Chrysler LLC, Kenosha Engine Plant, Including On-Site Leased Workers From Caravan Knight..., Kenosha Engine Plant, Kenosha, Wisconsin. The notice was published in [[Page 34171

  19. 78 FR 18402 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Notice of Designation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ...-4 thereunder,\\2\\ proposed rule changes to allow Retail Member Organizations (``RMOs'') to attest...-regulatory organization consents, the Commission shall either approve the proposed rule change, disapprove...-07] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Notice of Designation...

  20. 77 FR 9231 - FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    .... 13826-000] FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  1. Brigham City Hydro Generation Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ammons, Tom B.

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicatedmore » that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the

  2. 78 FR 43196 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... Fibre Paper and Packaging, Inc., Rumford Falls Hydro LLC, Brookfield Power Piney & Deep Creek LLC... system by clicking on the links or querying the docket number. Any person desiring to intervene or... encouraged. More detailed information relating to filing requirements, interventions, protests, service, and...

  3. Host regulation of lysogenic decision in bacteriophage lambda: transmembrane modulation of FtsH (HflB), the cII degrading protease, by HflKC (HflA).

    PubMed

    Kihara, A; Akiyama, Y; Ito, K

    1997-05-27

    The cII gene product of bacteriophage lambda is unstable and required for the establishment of lysogenization. Its intracellular amount is important for the decision between lytic growth and lysogenization. Two genetic loci of Escherichia coli are crucial for these commitments of infecting lambda genome. One of them, hflA encodes the HflKC membrane protein complex, which has been believed to be a protease degrading the cII protein. However, both its absence and overproduction stabilized cII in vivo and the proposed serine protease-like sequence motif in HflC was dispensable for the lysogenization control. Moreover, the HflKC protein was found to reside on the periplasmic side of the plasma membrane. In contrast, the other host gene, ftsH (hflB) encoding an integral membrane ATPase/protease, is positively required for degradation of cII, since loss of its function stabilized cII and its overexpression accelerated the cII degradation. In vitro, purified FtsH catalyzed ATP-dependent proteolysis of cII and HflKC antagonized the FtsH action. These results, together with our previous finding that FtsH and HflKC form a complex, suggest that FtsH is the cII degrading protease and HflKC is a modulator of the FtsH function. We propose that this transmembrane modulation differentiates the FtsH actions to different substrate proteins such as the membrane-bound SecY protein and the cytosolic cII protein. This study necessitates a revision of the prevailing view about the host control over lambda lysogenic decision.

  4. 75 FR 11916 - Chrysler Transportation LLC, a Subsidiary of Chrysler LLC, Including On-Site Leased Workers from...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... Chrysler manufacturing facilities, a substantial portion of which are shipped to an affiliated plant where... Caravan Knight Facilities Management LLC were employed on-site at the Detroit, Michigan location of... Knight Facilities Management, LLC, working on-site at the Detroit, Michigan location of Chrysler...

  5. Hydrological Modeling in Alaska with WRF-Hydro

    NASA Astrophysics Data System (ADS)

    Elmer, N. J.; Zavodsky, B.; Molthan, A.

    2017-12-01

    The operational National Water Model (NWM), implemented in August 2016, is an instantiation of the Weather Research and Forecasting hydrological extension package (WRF-Hydro). Currently, the NWM only covers the contiguous United States, but will be expanded to include an Alaska domain in the future. It is well known that Alaska presents several hydrological modeling challenges, including unique arctic/sub-arctic hydrological processes not observed elsewhere in the United States and a severe lack of in-situ observations for model initialization. This project sets up an experimental version of WRF-Hydro in Alaska mimicking the NWM to gauge the ability of WRF-Hydro to represent hydrological processes in Alaska and identify model calibration challenges. Recent and upcoming launches of hydrology-focused NASA satellite missions such as the Soil Moisture Active Passive (SMAP) and Surface Water Ocean Topography (SWOT) expand the spatial and temporal coverage of observations in Alaska, so this study also lays the groundwork for assimilating these NASA datasets into WRF-Hydro in the future.

  6. 76 FR 2713 - Croscill Acquisition, LLC, Currently Known as Croscill Home, LLC, Plant No. 8, Oxford, NC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ..., Currently Known as Croscill Home, LLC, Plant No. 8, Oxford, NC; Amended Certification Regarding Eligibility..., LLC, formerly doing business as Royal Home Fashions, a subsidiary of Croscill, Inc., Plant No. 8...). The workers are engaged in the supply of warehousing and distribution services of household products...

  7. 75 FR 52982 - Chrysler Group LLC, Formally Known as Chrysler LLC, Kenosha Engine Plant, Including On-Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... automobile engines. The company reports that workers leased from Syncreon were employed on-site at the..., Formally Known as Chrysler LLC, Kenosha Engine Plant, Including On-Site Leased Workers From Caravan Knight... Chrysler, LLC, Kenosha Engine Plant, Kenosha, Wisconsin. The notice was published in the Federal Register...

  8. Revitalising the nuclear business at Ontario Hydro

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Talbot, K.

    1994-12-31

    Ontario Hydro, North America`s largest electric Power utility, with an installed capacity of (34,000 MW) has undergone a major restructuring over the Past year to better align itself with a changing electricity market and evolving customer needs. After expanding for decades in step with the steady and continuous growth in electricity demands Ontario Hydro is now in its fifth straight Year Of flat or declining sales at about 136.5 TWhrs/year with little indication that demand growth will return to historic levels within the predictable future. This prolonged and unexpected decline in power demand coincided with the completion of the four-unit,more » 3600 megawatt Darlington Nuclear Generating Station and other major investments in new and existing transmission and generation facilities. These investments, coupled with the decline in sales, have put Hydro under severe financial pressure, necessitating rate increases totalling 30 percent between 1990 and 1993, and sparking intense customer criticism and political Pressure. Hydro`s new Chairman, Maurice Strong, responded by initiating a major restructuring of the organization last year into focused business units, designed to be more flexible and adaptive to customer needs, and more responsive to market and bottom line pressures; maintaining rate increases at or below inflation for the remainder of the decade and reducing the debt (currently 34B$Cdn), as well as becoming a world leader in sustainable energy development were the significant missions of change. In addition, the staff levels at Ontario Hydro were reduced from 27,800 by over 6,600, mostly the result of early retirement and voluntary separation programs.« less

  9. The HydroServer Platform for Sharing Hydrologic Data

    NASA Astrophysics Data System (ADS)

    Tarboton, D. G.; Horsburgh, J. S.; Schreuders, K.; Maidment, D. R.; Zaslavsky, I.; Valentine, D. W.

    2010-12-01

    The CUAHSI Hydrologic Information System (HIS) is an internet based system that supports sharing of hydrologic data. HIS consists of databases connected using the Internet through Web services, as well as software for data discovery, access, and publication. The HIS system architecture is comprised of servers for publishing and sharing data, a centralized catalog to support cross server data discovery and a desktop client to access and analyze data. This paper focuses on HydroServer, the component developed for sharing and publishing space-time hydrologic datasets. A HydroServer is a computer server that contains a collection of databases, web services, tools, and software applications that allow data producers to store, publish, and manage the data from an experimental watershed or project site. HydroServer is designed to permit publication of data as part of a distributed national/international system, while still locally managing access to the data. We describe the HydroServer architecture and software stack, including tools for managing and publishing time series data for fixed point monitoring sites as well as spatially distributed, GIS datasets that describe a particular study area, watershed, or region. HydroServer adopts a standards based approach to data publication, relying on accepted and emerging standards for data storage and transfer. CUAHSI developed HydroServer code is free with community code development managed through the codeplex open source code repository and development system. There is some reliance on widely used commercial software for general purpose and standard data publication capability. The sharing of data in a common format is one way to stimulate interdisciplinary research and collaboration. It is anticipated that the growing, distributed network of HydroServers will facilitate cross-site comparisons and large scale studies that synthesize information from diverse settings, making the network as a whole greater than the sum of its

  10. 77 FR 76020 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ..., Longview Fibre Paper and Packaging, Inc., Rumford Falls Hydro LLC, Brookfield Smoky Mountain Hydropower LLC...'s eLibrary system by clicking on the links or querying the docket number. Any person desiring to... proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions...

  11. Wound bed preparation: A novel approach using HydroTherapy.

    PubMed

    Atkin, Leanne; Ousey, Karen

    2016-12-01

    Wounds that fail to heal quickly are often encountered by community nursing staff. An important step in assisting these chronic or stalled wounds progress through healing is debridement to remove devitalised tissue, including slough and eschar, that can prevent the wound from healing. A unique wound treatment called HydroTherapy aims to provide an optimal healing environment. The first step of HydroTherapy involves HydroClean plus™, this dressing enables removal of devitalised tissue through autolytic debridement and absorption of wound fluid. Irrigation and cleansing provided by Ringer's solution from the dressing further removes any necrotic tissue or eschar. Once effective wound bed preparation has been achieved a second dressing, HydroTac™, provides an ongoing hydrated wound environment that enables re-epithelialisation to occur in an unrestricted fashion. This paper presents 3 case studies of slow healing wounds treated with HydroClean plus™ which demonstrates effective wound debridement.

  12. 78 FR 47807 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Granting an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ...-2011-84] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Granting an Extension to Limited Exemptions From Rule 612(c) of Regulation NMS In Connection With the Exchanges' Retail... under Rule 612(c) of Regulation NMS (``Sub-Penny Rule'') \\1\\ that granted the New York Stock Exchange...

  13. 75 FR 21352 - Chrysler Group LLC, Formerly Known as Chrysler LLC; Belvidere Assembly Plant: Including On-Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ..., Formerly Known as Chrysler LLC; Belvidere Assembly Plant: Including On-Site Leased Workers From Aerotek, G..., formerly known as Chrysler LLC, Belvidere Assembly Plant, include on- site leased workers from Aerotek and... certification for workers of the subject firm. The workers are engaged in activities related to the assembly the...

  14. Impact cratering in reduced-gravity environments: Early experiments on the NASA KC-135 aircraft

    NASA Technical Reports Server (NTRS)

    Cintala, Mark J.; Hoerz, F.; See, T. H.

    1987-01-01

    Impact experimentation on the NASA KC-135 Reduced-Gravity Aircraft was shown to be possible, practical, and of considerable potential use in examining the role of gravity on various impact phenomena. With a minimal facility, crater dimensional and growth-times were measured, and have demonstrated both agreement and disagreement with predictions. A larger facility with vacuum capability and a high-velocity gun would permit a much wider range of experimentation.

  15. The different modes of hydro-economic analysis (Invited)

    NASA Astrophysics Data System (ADS)

    Harou, J. J.; Binions, O.; Erfani, T.

    2013-12-01

    In the face of growing water demands, climate change and spatial and temporal water access variability, accurately assessing the economic impacts of proposed water resource management changes is useful. The objective of this project funded by UK Water Industry Research was to present and demonstrate a framework for identifying and using the ';value of water' to enable water utilities and their regulators to make better decisions. A hydro-economic model can help evaluate water management options in terms of their hydrological and economic impact at different locations throughout a catchment over time. In this talk we discuss three modes in which hydro-economic models can be implemented: evaluative, behavioral and prescriptive. In evaluation mode economic water demand and benefit functions are used to post-process water resource management model results to assess the economic impacts (over space and time) of a policy under consideration. In behavioral hydro-economic models users are represented as agents and the economics is used to help predict their actions. In prescriptive mode optimization is used to find the most economically efficient management actions such as allocation patterns or source selection. These three types of hydro-economic analysis are demonstrated on a UK watershed (Great River Ouse) that includes 97 different water abstractors from amongst the public water supply, agriculture, industry and energy plant cooling sectors. The following issues under dry and normal historical conditions were investigated: Supply/demand investment planning, societal cost of environmental flows, water market prices, and scarcity-sensitive charges for water rights. The talk discusses which hydro-economic modeling mode is used to study each of these issues and why; example results are shown and discussed. The topic of how hydro-economic models can be built and deployed effectively is covered along with how existing water utility operational and planning tools can be

  16. Overview of Hydrometeorologic Forecasting Procedures at BC Hydro

    NASA Astrophysics Data System (ADS)

    McCollor, D.

    2004-12-01

    Energy utility companies must balance production from limited sources with increasing demand from industrial, business, and residential consumers. The utility planning process requires a balanced, efficient, and effective distribution of energy from source to consumer. Therefore utility planners must consider the impact of weather on energy production and consumption. Hydro-electric companies should be particularly tuned to weather because their source of energy is water, and water supply depends on precipitation. BC Hydro operates as the largest hydro-electric company in western Canada, managing over 30 reservoirs within the province of British Columbia, and generating electricity for 1.6 million people. BC Hydro relies on weather forecasts of watershed precipitation and temperature to drive hydrologic reservoir inflow models and of urban temperatures to meet energy demand requirements. Operations and planning specialists in the company rely on current, value-added weather forecasts for extreme high-inflow events, daily reservoir operations planning, and long-term water resource management. Weather plays a dominant role for BC Hydro financial planners in terms of sensitive economic responses. For example, a two percent change in hydropower generation, due in large part to annual precipitation patterns, results in an annual net change of \\50 million in earnings. A five percent change in temperature produces a \\5 million change in yearly earnings. On a daily basis, significant precipitation events or temperature extremes involve potential profit/loss decisions in the tens of thousands of dollars worth of power generation. These factors are in addition to environmental and societal costs that must be considered equally as part of a triple bottom line reporting structure. BC Hydro water resource managers require improved meteorological information from recent advancements in numerical weather prediction. At BC Hydro, methods of providing meteorological forecast data

  17. 77 FR 29730 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE Amex LLC; Notice of Designation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-66981; SR-NYSE-2011-56; SR-NYSEAmex-2011-86] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE Amex LLC; Notice of Designation of Longer Period for Commission Action on Proceedings To Determine Whether to Disapprove Proposed Rule Changes To Codify Certain Traditional Trading Floor...

  18. 76 FR 29279 - Calvert Cliffs 3 Nuclear Project, LLC and Unistar Nuclear Operating Services, LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... NUCLEAR REGULATORY COMMISSION [DOCKET NO. 52-016; NRC-2008-0250] Calvert Cliffs 3 Nuclear Project, LLC and Unistar Nuclear Operating Services, LLC; Notice of Availability of the Final Environmental Impact Statement for the Combined License Application for Calvert Cliffs Nuclear Power Plant Unit 3 Notice is hereby given that the U.S. Nuclear...

  19. 76 FR 40945 - Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, Entergy Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0150; Docket Nos. 50-003, 50-247, and 50-286; License Nos. DPR-5, DPR-26, and DPR-64] Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, Entergy Nuclear Operations, Inc.; Receipt of Request for Action Notice is hereby given that by petition...

  20. 76 FR 68523 - Utah Southern Railroad Company, LLC-Change in Operators Exemption-Iron Bull Railroad Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... Railroad Company, LLC--Change in Operators Exemption--Iron Bull Railroad Company, LLC Utah Southern... to change operators from Iron Bull Railroad Company (IBRC) to USRC on a rail line known as the... an operating agreement with PIC. This change in operators is exempt under 49 CFR 1150.31(a)(3).\\1\\ \\1...

  1. 75 FR 61463 - The Narragansett Electric Company; Arcadia Gas Storage, LLC; Salt Plains Storage, LLC; Jefferson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-114-000; Docket No. PR10-117-000; Docket No. PR10-118- 000; Docket No. PR10-119-000; Docket No. PR10-120-000; Docket No. PR10- 121-000; Docket No. PR10-122-000 (Not Consolidated)] The Narragansett Electric Company; Arcadia Gas Storage, LLC; Salt Plains Storage, LLC;...

  2. 77 FR 41806 - RG Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... Leased Workers From Echelon Service Company, Sun Associated Industries, INC., MPI Consultants LLC... International, including on-site leased workers from Echelon Service Company, Sun Associated Industries, Inc... Company, Sun Associated Industries, Inc., MPI Consultants LLC, Alliance Engineering, Inc., Washington...

  3. Measurements of the Fuel Mileage of a KC-135 Aircraft with and Without Winglets

    NASA Technical Reports Server (NTRS)

    Temanson, G. E.

    1982-01-01

    The KC-135A Winglet Flight Research and Demonstration Program was a joint effort of the Air Force, NASA and the Boeing Military Airplane Company to flight test winglets on the KC-135A. The primary objective of the program was to verify the cruise performance improvements predicted by analysis and wind tunnel tests. Flight test data were obtained for winglets positioned at 15 deg cant/-2 deg incidence, 0 deg cant/-4 deg incidence, 15 deg cant/-4 deg incidence and for winglets off (baseline). Both fuel mileage and drag measurements were obtained. The 15 deg cant/-4 deg incidence winglet configuration provided the greatest performance improvement. The flight test measured fuel mileage improvement for a 0.78 Mach number was 3.1 percent at 8 x 10(5) pounds W/delta and 5.5 percent at 1.05 x 10(6) pounds W/delta. Correcting the flight measured data for surface pressure differences between wind tunnel and flight resulted in a fuel mileage improvement of 4.4 percent at 8 x 10(5) pounds W/delta and 7.2 percent at 1.05 x 10(6) pounds W/delta. The agreement between the fuel mileage and drag data was excellent.

  4. 76 FR 82011 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE Amex LLC; Notice of Designation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-66036; File Nos. SR-NYSE-2011-56; SR-NYSEAmex-2011-86] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE Amex LLC; Notice of Designation of a Longer Period for Commission Action on Proposed Rule Changes To Codify Certain Traditional Trading Floor Functions That May Be Performed by...

  5. 78 FR 29406 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Notice of Designation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-69575; File Nos. SR-NYSE-2012-57; SR-NYSEMKT-2012-58] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Notice of Designation of Longer Period for Commission Action on Proceedings To Determine Whether To Disapprove Proposed Rule Changes Deleting NYSE Rules 95(c) and (d)...

  6. Medical evaluations on the KC-135 1990 flight report summary

    NASA Technical Reports Server (NTRS)

    Lloyd, Charles W.; Guess, Terrell M.; Whiting, Charles W.; Doarn, Charles R.

    1991-01-01

    The medical investigations completed on the KC-135 during FY 1990 in support of the development of the Health Maintenance Facility and Medical Operations are discussed. The experiments are comprised of engineering evaluations of medical hardware and medical procedures. The investigating teams are made up of both medical and engineering personnel responsible for the development of medical hardware and medical operations. The hardware evaluated includes dental equipment, a coagulation analyzer, selected pharmaceutical aerosol devices, a prototype air/fluid separator, a prototype packaging and stowage system for medical supplies, a microliter metering system, and a workstation for minor surgical procedures. The results of these engineering evaluations will be used in the design of fleet hardware as well as to identify hardware specific training requirements.

  7. 77 FR 20019 - FirstEnergy Solutions Corp., Allegheny Energy Supply Company, LLC v. PJM Interconnection, L.L.C...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-50-000] FirstEnergy Solutions Corp., Allegheny Energy Supply Company, LLC v. PJM Interconnection, L.L.C.; Notice of Complaint... 206 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure, 18 CFR 385.206 and...

  8. 75 FR 20591 - AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice of Final General Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... quality impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal and natural gas pipeline proposed by AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC, in... of the following LNG terminal and natural gas pipeline facilities: A ship unloading facility, with...

  9. 78 FR 46938 - St. Paul Park Refining Co. LLC v. Enbridge Pipelines (North Dakota) LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR13-28-000] St. Paul Park..., 2013, St. Paul Park Refining Co. LLC (Complainant) filed a formal complaint against Enbridge Pipelines... regulatory basis. St. Paul Park Refining Co. LLC certifies that copies of the complaint were served on the...

  10. 75 FR 77670 - SuperMedia, LLC, Formerly Known as Idearc Media, LLC, a Subsidiary of SuperMedia Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... Known as Idearc Media, LLC, a Subsidiary of SuperMedia Information Services, LLC Publishing Group, Troy... for Reconsideration. The Notice was published in the Federal Register on October 25, 2010 (75 FR 65515... directly competitive with those provided by the Publishing Group. Conclusion After careful review of the...

  11. 78 FR 54487 - YP Western Directory LLC, San Francisco Division, Publishing Operations Group, YP Subsidiary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ... Directory LLC, San Francisco Division, Publishing Operations Group, YP Subsidiary Holdings LLC, YP LLC, YP... Directory LLC, San Francisco Division, Publishing Operations Group, YP Subsidiary Holdings LLC, YP LLC, YP... workers of YP Western Directory LLC, San Francisco Division, Publishing Operations Group, YP Subsidiary...

  12. 76 FR 76153 - Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ...] Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC, Mesquite Solar 1, LLC, Copper Crossing Solar LLC, Copper Mountain Solar 1, LLC, Pinnacle Wind, LLC, Bellevue Solar, LLC, Yamhill Solar, LLC, Osage Wind, LLC, Minco Wind II, LLC Take notice that during the month of...

  13. The Marshall Space Flight Center KC-135 zero gravity test program for FY 1982

    NASA Technical Reports Server (NTRS)

    Shurney, R. E. (Editor)

    1983-01-01

    During FY-82, researchers and experimenters from Marshall Space Flight Center (MSFC) conducted 11 separate investigations during 26.3 hr of testing aboard the KC-135 zero-gravity aircraft, based at Ellington Air force Base, Texas. Although this represented fewer hours than initially projected, all experiment and test objectives were met or exceeded. This Technical Memorandum compiles all results achieved by MSFC users during FY-82, a year considered to be highly productive.

  14. Teacher in Space Christa McAuliffe on the KC-135 for zero-G training

    NASA Image and Video Library

    1986-01-08

    S86-25191 (for release January 1986) --- The two representatives of the Teacher-in-Space Project continue their training program at the Johnson Space Center with an additional flight aboard NASA?s KC-135 ?zero gravity? aircraft. Sharon Christa McAuliffe, left, is prime crew payload specialist, and Barbara R. Morgan is in training as backup payload specialist. The photo was taken by Keith Meyers of New York Times. Photo credit: NASA

  15. Responses of heart rate and blood pressure to KC-135 hyper-gravity

    NASA Technical Reports Server (NTRS)

    Satake, Hirotaka; Matsunami, Ken'ichi; Reschke, Millard F.

    1992-01-01

    Many investigators have clarified the effects of hyper gravitational-inertial forces (G) upon the cardiovascular system, using the centrifugal apparatus with short rotating radius. We investigated the cardiovascular responses to KC-135 hyper-G flight with negligibly small angular velocity. Six normal, healthy subjects 29 to 40 years old (5 males and 1 female) took part in this experiment. Hyper gravitational-inertial force was generated by the KC-135 hyper-G flight, flown in a spiral path with a very long radius of 1.5 miles. Hyper-G was sustained for 3 minutes with 1.8 +Gz in each session and was repeatedly exposed to very subject sitting on a chair 5 times. The preliminary results of blood pressure and R-R interval are discussed. An exposure of 1.8 +Gz stress resulted in a remarkable increase of systolic and diastolic blood pressure, while the pulse pressure did not change and remained equal to the control level regardless of an exposure of hyper-G. These results in blood pressure indicate an increase of resistance in the peripheral vessels, when an exposure of hyper-G was applied. The R-R interval was calculated from ECG. R-R interval in all subjects was changed but not systematically, and R-R interval became obviously shorter during the hyper-G period than during the 1 +Gz control period although R-R interval varied widely in some cases. The coefficient of variation of R-R interval was estimated to determine the autonomic nerve activity, but no significant change was detectable.

  16. The HydroShare Collaborative Repository for the Hydrology Community

    NASA Astrophysics Data System (ADS)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of, and collaboration around, "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting our approach to making this system easy to use and serving the needs of the hydrology community represented by the Consortium of Universities for the Advancement of Hydrologic Sciences, Inc. (CUAHSI). Metadata for uploaded files is harvested automatically or captured using easy to use web user interfaces. Users are encouraged to add or create resources in HydroShare early in the data life cycle. To encourage this we allow users to share and collaborate on HydroShare resources privately among individual users or groups, entering metadata while doing the work. HydroShare also provides enhanced functionality for users through web apps that provide tools and computational capability for actions on resources. HydroShare's architecture broadly is comprised of: (1) resource storage, (2) resource exploration website, and (3) web apps for actions on resources. System components are loosely coupled and interact through APIs, which enhances robustness, as components can be upgraded and advanced relatively independently. The full power of this paradigm is the

  17. 76 FR 25378 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Units 2 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-277 and 50-278; NRC-2011-0101] Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Units 2 and 3; Notice of Withdrawal of... for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, located in York and Lancaster...

  18. 77 FR 8248 - Bluewater Gas Storage, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-51-000] Bluewater Gas Storage, LLC; Notice of Application Take notice that on January 27, 2012, Bluewater Gas Storage, LLC... Wilson Kisluk, Senior Attorney, Bluewater Gas Storage, LLC, 333 Clay Street, Suite 1500, Houston, Texas...

  19. STS-45 crewmembers during zero gravity activities onboard KC-135 NASA 930

    NASA Technical Reports Server (NTRS)

    1991-01-01

    STS-45 Atlantis, Orbiter Vehicle (OV) 104, crewmembers and backup payload specialist participate in zero gravity activities onboard KC-135 NASA 930. The crewmembers, wearing flight suits, float and tumble around an inflated globe during the few seconds of microgravity created by parabolic flight. With his hand on the fuselage ceiling is Payload Specialist Dirk D. Frimout. Clockwise from his position are Mission Specialist (MS) C. Michael Foale, Pilot Brian Duffy, backup Payload Specialist Charles R. Chappell, MS and Payload Commander (PLC) Kathryn D. Sullivan (with eye glasses), Commander Charles F. Bolden, and Payload Specialist Byron K. Lichtenberg.

  20. Producing more power from existing hydro resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Connor, J.

    1993-02-01

    Rehabilitation is big business in the North American hydropower industry. Hydropower producers are replacing or rehabilitating turbines, uprating old hydro generators, and installing advanced control systems. Estimates indicate that as much as 15,000 MW of new electricall generating capacity can be obtained by rehabilitating existing hydro facilities. The cost of developing this capacity is far less than for building new power projects. In most rehabilitation projects, the existing dam, powerhouse, and access roads are retained; only new mechanical and electrica equipment is required. As a result, these projects often can be accomplished for about half the cost of developing amore » new thermal plant to provide an equivalent amount of capacity. This new power does not contribute to atmospheric pollution, cause increases in operations and maintenance costs, or create uncertainties about fuel sources. The Bureau of Reclamation, the Salt River Project, the New York Power Authority, and the Tennessee Valley Authority all are either in the midst of major hydro rehabilitation projects or gearing up for future work. This activity indicates a healthy market of hydro products and services for years to come.« less

  1. 75 FR 6071 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station Units 2 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-277 and 50-278; NRC-2010-0042] Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station Units 2 and 3; Notice of Withdrawal of... and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, located in York and...

  2. 78 FR 48668 - PSEG Long Island LLC, Long Island Electric Utility Servco LLC, Long Island Power Authority, Long...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. EL13-81-000] PSEG Long Island LLC, Long Island Electric Utility Servco LLC, Long Island Power Authority, Long Island Lighting Company; Notice of Petition for Declaratory Order Take notice that on August 1, 2013, pursuant to Rule 207 of the Federal Energy Regulatory...

  3. Collaborative Sharing of Multidimensional Space-time Data Using HydroShare

    NASA Astrophysics Data System (ADS)

    Gan, T.; Tarboton, D. G.; Horsburgh, J. S.; Dash, P. K.; Idaszak, R.; Yi, H.; Blanton, B.

    2015-12-01

    HydroShare is a collaborative environment being developed for sharing hydrological data and models. It includes capability to upload data in many formats as resources that can be shared. The HydroShare data model for resources uses a specific format for the representation of each type of data and specifies metadata common to all resource types as well as metadata unique to specific resource types. The Network Common Data Form (NetCDF) was chosen as the format for multidimensional space-time data in HydroShare. NetCDF is widely used in hydrological and other geoscience modeling because it contains self-describing metadata and supports the creation of array-oriented datasets that may include three spatial dimensions, a time dimension and other user defined dimensions. For example, NetCDF may be used to represent precipitation or surface air temperature fields that have two dimensions in space and one dimension in time. This presentation will illustrate how NetCDF files are used in HydroShare. When a NetCDF file is loaded into HydroShare, header information is extracted using the "ncdump" utility. Python functions developed for the Django web framework on which HydroShare is based, extract science metadata present in the NetCDF file, saving the user from having to enter it. Where the file follows Climate Forecast (CF) convention and Attribute Convention for Dataset Discovery (ACDD) standards, metadata is thus automatically populated. Users also have the ability to add metadata to the resource that may not have been present in the original NetCDF file. HydroShare's metadata editing functionality then writes this science metadata back into the NetCDF file to maintain consistency between the science metadata in HydroShare and the metadata in the NetCDF file. This further helps researchers easily add metadata information following the CF and ACDD conventions. Additional data inspection and subsetting functions were developed, taking advantage of Python and command line

  4. 76 FR 30341 - Reliable Storage 1 LLC;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... DEPARTMENT OF ENERGY [Project No. 14152-000] Reliable Storage 1 LLC; Notice of Preliminary Permit... March 25, 2011, Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal... waters owned by others without the owners' express permission. The proposed pumped storage project would...

  5. 77 FR 41454 - Entergy Nuclear Indian Point Unit 2, LLC, Entergy Nuclear Indian Point Unit 3, LLC, Entergy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247 and 50-286; NRC-2012-0168] Entergy Nuclear Indian Point Unit 2, LLC, Entergy Nuclear Indian Point Unit 3, LLC, Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Units 2 and 3; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC...

  6. 77 FR 24197 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... Drawing Mississippi 8 Hydro, LLC Project No. 13010-002. FFP Project 98, LLC Project No. 14272-000. The..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  7. Environmental Assessment KC-46A Depot Maintenance Activation, Tinker Air Force Base, Oklahoma. Volume 1

    DTIC Science & Technology

    2014-03-01

    difficulty in obtaining replacement parts, the Ai r Force has challenges in maintaining tbe KC-135 fleet (USAF 2005). Additionally this fleet has been...aircraft fleet wi ll remain within the Ai r Force inventory. Therefore, only the BNSF Rail Yard and DLA Infill were carried forward for further...surface water from C&D activities. In addition, existing Tinker AFB National Pollutant Discharge Elimination System permit, general permits (multi- sector

  8. Inactivation of LLC1 gene in nonsmall cell lung cancer

    PubMed Central

    Hong, Kyeong-Man; Yang, Sei-Hoon; Chowdhuri, Sinchita R.; Player, Audrey; Hames, Megan; Fukuoka, Junya; Meerzaman, Daoud; Dracheva, Tatiana; Sun, Zhifu; Yang, Ping; Jen, Jin

    2007-01-01

    Serial analysis of gene expression studies led us to identify a previously unknown gene, c20orf85, that is present in the normal lung epithelium, but absent or downregulated in most primary non-small cell lung cancers and lung cancer cell lines. We named this gene LLC1 for Low in Lung Cancer 1. LLC1 is located on chromosome 20q13.3 and has a 70% GC content in the promoter region. It has 4 exons and encodes a protein containing 137 amino acids. By in situ hybridization, we observed that LLC1 message is localized in normal lung bronchial epithelial cells, but absent in 13 of 14 lung adenocarcinoma and 9 out of 10 lung squamous carcinoma samples. Methylation at CpG sites of the LLC1 promoter was frequently observed in lung cancer cell lines and in a fraction of primary lung cancer tissues. Treatment with 5-aza deoxycytidine resulted in a reduced methylation of the LLC1 promoter concomitant with the increase of LLC1 expression. These results suggest that inactivation of LLC1 by means of promoter methylation is a frequent event in nonsmall cell lung cancer and may play a role in lung tumorigenesis. PMID:17304513

  9. Revised tuning of Ocean Drilling Program Site 964 and KC01B (Mediterranean) and implications for the δ18O, tephra, calcareous nannofossil, and geomagnetic reversal chronologies of the past 1.1 Myr

    NASA Astrophysics Data System (ADS)

    Lourens, Lucas J.

    2004-09-01

    High-resolution color reflectance records of KC01 and KC01B (Calabrian Ridge, Ionian Sea) are presented and compared with a modified spliced high-resolution color reflectance record of Ocean Drilling Program (ODP) Site 964. This comparison revealed that KC01B is characterized by intensive deformation between ~27 and 28.5 m piston depth and that some sapropels are tectonically reduced in thickness. Moreover, the piston coring has caused considerable stretching in the top of KC01 and KC01B. Using a new splice of ODP Site 964 as guide, previous astronomical tuned timescales of KC01B and ODP Site 964 were evaluated. This evaluation resulted in a new sapropel-based astronomical timescale for the last 1.1 Myr. The new timescale implies a much more uniform change in sedimentation rate for the Ionian Sea cores. Two prominent excursions to lighter values in the δ18O record of the planktonic foraminiferal species Globigerinoides ruber occur during marine isotopic stages 12 and 16 applying the new timescale. These shifts correspond with maxima in obliquity and are punctuated by minima in the precession cycle. They are absent in global ice volume records and are interpreted as reflecting a (summer) low-salinity surface water lens that floats on top of extremely saline intermediate and deep waters at times of the very low sea levels during these glacial periods. All biostratigraphic and magnetostratigraphic events found in KC01B and ODP Site 964 were re-dated according to the new timescale, and the ages of 33 tephra layers were reviewed. The new ages for the Calabrian Ridge 2 and 3 magnetic events in the Brunhes are concordant with minima in the global Sint800 composite record, derived from worldwide deep-sea records of relative paleointensity and have been attributed to the Big Lost and La Palma excursions, respectively.

  10. 78 FR 77618 - Airworthiness Directives; M7 Aerospace LLC Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ...-1057; Directorate Identifier 2013-CE-041-AD] RIN 2120-AA64 Airworthiness Directives; M7 Aerospace LLC...). SUMMARY: We propose to adopt a new airworthiness directive (AD) for all M7 Aerospace LLC Models SA226-AT... bulkhead. This proposed AD also requires reporting certain inspection results to M7 Aerospace LLC. We are...

  11. Assessment of spatially distributed values of Kc using vegetation indices derived from medium resolution satellite data

    NASA Astrophysics Data System (ADS)

    Greco, M.; Simoniello, T.; Lanfredi, M.; Russo, A. L.

    2010-09-01

    In the last years, the theme of suitable assessment of irrigation water supply has been raised relevant interest for both general principles of sustainable development and optimization of water resources techniques and management. About 99% of the water used in agriculture is lost by crops as evapotranspiration (ET). Thus, it becomes crucial to drive direct or indirect measurement in order to perform a suitable evaluation of water loss by evapotranspiration (i.e. actual evapotranspiration) as well as crop water status and its effect on the production. The main methods used to measure evapotranspiration are available only at field scale (Bowen ratio, eddy correlation system, soil water balance) confined to a small pilot area, generally due to expense and logistical constraints. This led over the last 50 years to the development of a large number of empirical methods to estimate evapotranspiration through different climatic and meteorological variables as well as combining models, based on aerodynamic theory and energy balance, taking into account both canopy properties and meteorological conditions. Among these, the Penman-Monteith equation seems to give the best results providing a robust and consistent method world wide accepted. Such conventional methods only provide accurate evapotranspiration assessment for a homogeneous region nearby the meteorological gauge station and cannot be extrapolated to other different sites; whereas remote sensing techniques allow for filling up such a gap. Some of these satellite techniques are based on the use of thermal band signals as inputs for energy balance equations. Another common approach is mainly based on the FAO method for estimating crop evapotranspiration, in which evapotranspiration data are multiplied by crop coefficients, Kc, derived from satellite multispectral vegetation indices obtained. The rationale behind such a link considers that Kc and vegetation indices are sensitive to both leaf area index and fractional

  12. Design and test of a prototype thermal bus evaporator reservoir aboard the KC-135 0-g aircraft

    NASA Technical Reports Server (NTRS)

    Brown, Richard F.; Gustafson, Eric; Long, W. Russ

    1987-01-01

    The Thermal Bus Zero-G Reservoir Demonstration Experiment (RDE) has currently undergone two flights on the NASA-JSC KC-135 Reduced Gravity Aircraft. The objective of the experiment, which uses a smaller version of the evaporator reservoirs being designed for the Prototype Thermal Bus for Space Station, is to demonstrate proper 0-g operation of the reservoir in terms of fluid positioning, draining, and filling. The KC-135 was chosen to provide a cost-effective and timely evaluation of 0-g design issues that would be difficult to predict analytically. A total of fifty 0-g parabolas have been flown, each providing approximately 25-30 seconds of 0-g time. While problems have been encountered, the experiment has provided valuable design data on the 0-g operation of the reservoir. This paper documents the design of the experiment; the results of both flights, based on the high-speed movies taken during the flight and the visual observations of the experimenters; and the design modifications made as a result of the first flight and planned as a result of the second flight.

  13. HydroViz: evaluation of a web-based tool for improving hydrology education

    NASA Astrophysics Data System (ADS)

    Habib, E.; Ma, Y.; Williams, D.; Sharif, H.; Hossain, F.

    2012-02-01

    HydroViz is a web-based, student-centered, highly visual educational tool designed to support active learning in the field of Engineering Hydrology. The development of HydroViz is informed by recent advances in hydrologic data, numerical simulations, visualization and web-based technologies. An evaluation study was conducted to determine the effectiveness of HydroViz, to examine the buy-in of the program, and to identify project components that need to be improved. A total of 182 students from seven freshmen and junior-/senior-level undergraduate classes in three universities participated in the study over the course of two semesters (spring 2010 and fall 2010). Data sources included homework assignments, online surveys, and informal interviews with students. Descriptive statistics were calculated for homework and the survey. Qualitative analysis of students' comments and informal interview notes were also conducted to identify ideas and patterns. HydroViz was effective in facilitating students' learning and understanding of hydrologic concepts and increasing related skills. Students had positive perceptions of various features of HydroViz and they believe that HydroViz fits well in the curriculum. The experience with HydroViz was somewhat effective in raising freshmen civil engineering students' interest in hydrology. In general, HydroViz tend to be more effective with students in junior- or senior-level classes than students in freshmen classes. There does not seem to be obvious differences between different universities. Students identified some issues that can be addressed to improve HydroViz. Future adaptation and expansion studies are under planning to scale-up the application and utility of HydroViz into various hydrology and water-resource engineering curriculum settings.

  14. 76 FR 14652 - Port Barre Investments, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... Investments, L.L.C.; Notice of Application Take notice that on March 4, 2011, Port Barre Investments, L.L.C. (Bobcat) filed in Docket No. CP11-124-000 an application pursuant to section 7(c) of the Natural Gas Act... Investments, L.L.C., 126 FERC ] 61,240 (2009). \\2\\ Port Barre Investments, L.L.C., 130 FERC ] 62,272 (2010...

  15. Microgravity Impact Experiments: The Prime Campaign on the NASA KC-135

    NASA Astrophysics Data System (ADS)

    Colwell, Joshua E.; Sture, Stein; Lemos, Andreas R.

    2002-11-01

    Low velocity collisions (v less than 100 m/s) occur in a number of astrophysical contexts, including planetary rings, protoplanetary disks, the Kuiper belt of comets, and in secondary cratering events on asteroids and planetary satellites. In most of these situations the surface gravity of the target is less than a few per cent of 1 g. Asteroids and planetary satellites are observed to have a regolith consisting of loose, unconsolidated material. Planetary ring particles likely are also coated with dust based on observations of dust within ring systems. The formation of planetesimals in protoplanetary disks begins with the accretion of dust particles. The response of the surface dust layer to collisions in the near absence of gravity is necessary for understanding the evolution of these systems. The Collisions Into Dust Experiment (COLLIDE) performs six impact experiments into simulated regolith in microgravity conditions on the space shuttle. The parameter space to be explored is quite large, including effects such as impactor mass and velocity, impact angle, target porosity, size distribution, and particle shape. We have developed an experiment, the Physics of Regolith Impacts in Microgravity Experiment (PRIME), that is analogous to COLLIDE that is optimized for flight on the NASA KC-135 reduced gravity aircraft. The KC-135 environment provides the advantage of more rapid turnover between experiments, allowing a broader range of parameters to be studied quickly, and more room for the experiment so that more impact experiments can be performed each flight. The acceleration environment of the KC-135 is not as stable and minimal as on the space shuttle, and this requires impact velocities to be higher than the minimum achievable with COLLIDE. The experiment consists of an evacuated PRIME Impact Chamber (PIC) with an aluminum base plate and acrylic sides and top. A target tray, launcher, and mirror mount to the base plate. The launcher may be positioned to allow for

  16. 77 FR 74245 - ING Investments, LLC, et al.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Investments, LLC (``IIL''), Directed Services LLC (``DSL'') and ING Investment Management Co. LLC (``IIM..., at (202) 551-6821 (Division of Investment Management, Office of Investment Company Regulation..., N.V. 2. Each Registrant is registered under the Act as an open-end management investment company...

  17. 77 FR 70159 - Marble River, LLC v. Noble Clinton Windpark I, LLC, Noble Ellenburg Windpark, LLC, Noble...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-20-000] Marble River... Commission's (Commission) Rules of Practice and Procedure, Marble River, LLC (Marble River or Complainant.... (NYISO or Respondent), alleging that Noble failed to pay Marble River for headroom created by common...

  18. 78 FR 57796 - Safety Zone; Pro Hydro-X Tour, Atlantic Ocean, Islamorada, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... 1625-AA00 Safety Zone; Pro Hydro-X Tour, Atlantic Ocean, Islamorada, FL AGENCY: Coast Guard, DHS... waters of the Atlantic Ocean, Islamorada, Florida during the Pro Hydro- X Tour. The Pro Hydro-X Tour is a... course for each race. The Pro Hydro-X Tour is scheduled to take place on September 20, 21, and 22, 2013...

  19. Draft Environmental Impact Statement: Second KC-135R Air Refueling Squadron, Malmstrom Air Force Base, Montana

    DTIC Science & Technology

    1989-05-01

    The environmental consequences of the proposed deployment of Second KC-135R I AREFS were evaluated in terms of the magnitude and significance of...A for more details). The LOI and significance of short and long-duration impacts were evaluated separately. Short duration impacts are transitory...factors evaluated . n Public Finance. The public finance element describes the fiscal condition of the affected counties, cities, and school districts

  20. Waterford Ventures, LLC

    EPA Pesticide Factsheets

    The EPA is providing notice of a proposed Administrative Penalty Assessment against Waterford Ventures, LLC, a business located at 3100 White Pine Court, Waukee, IA 50263, for alleged violations at the Waterford Pointe Subdivision, located at the intersect

  1. 76 FR 4894 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Drawing January 20, 2011. Lock Hydro Friends Fund XLI Project No. 13736-000 Allegheny 7 Hydro, LLC Project... Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the two applicants identified in this notice. The drawing is open to the public and will be held in room...

  2. HydroShare: A Platform for Collaborative Data and Model Sharing in Hydrology

    NASA Astrophysics Data System (ADS)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of and collaboration around "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting its use as a virtual environment supporting education and research. HydroShare has components that support: (1) resource storage, (2) resource exploration, and (3) web apps for actions on resources. The HydroShare data discovery, sharing and publishing functions as well as HydroShare web apps provide the capability to analyze data and execute models completely in the cloud (servers remote from the user) overcoming desktop platform limitations. The HydroShare GIS app provides a basic capability to visualize spatial data. The HydroShare JupyterHub Notebook app provides flexible and documentable execution of Python code snippets for analysis and modeling in a way that results can be shared among HydroShare users and groups to support research collaboration and education. We will discuss how these developments can be used to support different types of educational efforts in Hydrology where being completely web based is of value in an educational setting as students can all have access to the same functionality regardless of their computer.

  3. 75 FR 1049 - Wausau Paper Printing & Writing, LLC,

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2533-046] Wausau Paper Printing & Writing, LLC, Wausau Paper Mills, LLC; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene December 30, 2009. On December 10, 2009, Wausau Paper Printing...

  4. Vibration analysis of a hydro generator for different operating regimes

    NASA Astrophysics Data System (ADS)

    Haţiegan, C.; Pădureanu, I.; Jurcu, M.; Nedeloni, M. D.; Hamat, C. O.; Chioncel, C. P.; Trocaru, S.; Vasile, O.; Bădescu, O.; Micliuc, D.; (Filip Nedeloni, L.; Băra, A.; (Barboni Haţiegan, L.

    2017-01-01

    Based on experimental measurements, this paper presents the vibration analysis of a hydro generator that equips a Kaplan hydraulic turbine of a Hydropower plant in Romania. This analysis means vibrations measurement to different operating regimes of the hydro generator respectively before installing it and into operation, namely putting off load mode (unexcited and excited) respectively putting on load mode. By comparing, through the experimental results obtained before and after the operation of hydro aggregates are observed vibrations improvements.

  5. 11. AERIAL VIEW OF CROSSCUT FACILITY, LOOKING NORTH. THE HYDRO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. AERIAL VIEW OF CROSSCUT FACILITY, LOOKING NORTH. THE HYDRO PLANT CENTER SITS ON THE EDGE OF RAVINE WHICH IS ACTUALLY THE BEGINNING OF THE GRAND CANAL. THE CROSS-CUT STEAM PLANT IS THE LARGE WHITE BUILDING JUST WEST OF THE HYDRO PLANT, WITH THE TRANSMISSION SWITCHYARD IN BETWEEN. THE OTHER BUILDINGS ARE SALT RIVER PROJECT FABRICATION AND EQUIPMENT SHOPS Photographer unknown, August 22, 1958 - Cross Cut Hydro Plant, North Side of Salt River, Tempe, Maricopa County, AZ

  6. 76 FR 35882 - Paulding Wind Farm II, LLC, et al.;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... Wind Farm II, LLC, et al.; Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Paulding Wind Farm II LLC EG11-61-000 Macho Springs Power I, LLC EG11-63-000 Alta Wind III Owner Lessor A EG11-64-000 Alta Wind III Owner Lessor B EG11-65-000 Alta Wind III Owner Lessor C EG11-66-000 Alta Wind...

  7. 76 FR 16405 - Notice of Attendance at PJM INterconnection, L.L.C., Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... INterconnection, L.L.C., Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C., (PJM...: Docket No. EL05-121, PJM Interconnection, L.L.C. Docket No. ER06-456, PJM Interconnection, L.L.C. Docket...

  8. 78 FR 19259 - Notice of Attendance at PJM Interconnection, L.L.C. Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... Interconnection, L.L.C. Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C. (PJM... proceedings: Docket No. EL05-121, PJM Interconnection, L.L.C. Docket No. EL08-14, Black Oak Energy LLC, et al...

  9. 76 FR 36533 - Bangor Hydro Electric Company; Notice of Request for Waiver

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-5-000] Bangor Hydro...(d) of the Commission's regulations, 18 CFR 358.1(d) (2011), Bangor Hydro Electric Company (Bangor Hydro) requests a limited waiver of Part 358 of the Commission's Regulations, Standards of Conduct for...

  10. 2. INTERIOR VIEW OF CROSSCUT HYDRO PLANT, SHOWING 25 CYCLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. INTERIOR VIEW OF CROSSCUT HYDRO PLANT, SHOWING 25 CYCLE GENERATING UNITS AND EXCITER UNITS FOREGROUND Photographer unknown, March 4, 1953 - Cross Cut Hydro Plant, North Side of Salt River, Tempe, Maricopa County, AZ

  11. 78 FR 16500 - Rolling Bay, LLC and Indus; Transfer of Data

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... contract to perform work for OPP, and access to this information will enable Rolling Bay, LLC and its subcontractor, Indus, to fulfill the obligations of the contract. DATES: Rolling Bay, LLC and its subcontractor... Under Contract No. GS-35F-0072Y, Rolling Bay, LLC and its subcontractor, Indus, will: Capture data that...

  12. 75 FR 16662 - Airworthiness Directives; Kelly Aerospace Energy Systems, LLC Rebuilt Turbochargers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... Airworthiness Directives; Kelly Aerospace Energy Systems, LLC Rebuilt Turbochargers AGENCY: Federal Aviation... airworthiness directive (AD) for certain Kelly Aerospace Energy Systems, LLC (KAES) rebuilt turbochargers. This... Federal holidays. Fax: (202) 493-2251. Contact Kelly Aerospace Energy Systems, LLC, 2900 Selma Highway...

  13. 5. INTERIOR VIEW OF CROSSCUT HYDRO PLANT, SHOWING 25 CYCLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR VIEW OF CROSSCUT HYDRO PLANT, SHOWING 25 CYCLE GENERATING UNITS FOREGROUND AND 60 CYCLE GENERATING UNIT REAR Photographer unknown, no date - Cross Cut Hydro Plant, North Side of Salt River, Tempe, Maricopa County, AZ

  14. 75 FR 40815 - PJM Interconnection, L.L.C.; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... Interconnection, L.L.C.; Notice of Filing July 7, 2010. Take notice that on July 1, 2010, PJM Interconnection, L.L.C. (PJM) filed revised sheets to Schedule 1 of the Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. (Operating Agreement) and the parallel provisions of Attachment K--Appendix of the PJM...

  15. 75 FR 22773 - PJM Interconnection, L.L.C.; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Interconnection, L.L.C.; Notice of Filing April 23, 2010. Take notice that on April 22, 2010, PJM Interconnection, L.L.C. (PJM) filed revised tariff sheets to its Schedule 1 of the Amended and Restated Operating... (Commission) March 23, 2010 Order on Compliance Filing, PJM Interconnection, L.L.C., 130 FERC ] 61,230 (2010...

  16. 77 FR 34378 - PJM Interconnection, L.L.C.; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Interconnection, L.L.C.; Notice of Complaint Take notice that on June 1, 2012, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824(e), PJM Interconnection, L.L.C. (PJM) filed proposed revisions to the Amended and Restated Operating Agreement of PJM Interconnection L.L.C. (Operating Agreement) to...

  17. Teacher in Space Christa McAuliffe on the KC-135 for zero-G training

    NASA Image and Video Library

    1986-01-08

    S86-25180 (October 1985) --- Sharon Christa McAuliffe, STS-51L citizen observer/payload specialist, representing the Teacher-in-Space Project, floats forward and upward during a few moments of weightlessness aboard a KC-135 aircraft. The flight is part of her training for the scheduled five-day flight aboard the Challenger in January of next year. Barbara R. Morgan, backup payload specialist for STS-51L, is partially visible in the background. The photo was taken by Keith Meyers of the New York Times. Photo credit: NASA

  18. ENVIRONMENTAL TECHNOLOGY VERIFICATION: JOINT (NSF-EPA) VERIFICATION STATEMENT AND REPORT HYDRO COMPLIANCE MANAGEMENT, INC. HYDRO-KLEEN FILTRATION SYSTEM, 03/07/WQPC-SWP, SEPTEMBER 2003

    EPA Science Inventory

    Verification testing of the Hydro-Kleen(TM) Filtration System, a catch-basin filter designed to reduce hydrocarbon, sediment, and metals contamination from surface water flows, was conducted at NSF International in Ann Arbor, Michigan. A Hydro-Kleen(TM) system was fitted into a ...

  19. 76 FR 56748 - Sunshine Act Meeting Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    ...-000 Southwest Power Pool, Inc. E-11 ER11-3064-001 PJM Interconnection, L.L.C. and Trans-Allegheny... Inc. and New England Power Pool. E-14 ER11-2224-004 New York Independent System Operator, Inc. ER11... Natural Gas Companies. Hydro H-1 P-2698-050 Duke Energy Carolinas, LLC. P-2686-062 H-2 P-13681-002 Grand...

  20. 78 FR 22808 - Special Local Regulations; Pro Hydro-X Tour, Lake Dora; Tavares, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ...-AA08 Special Local Regulations; Pro Hydro-X Tour, Lake Dora; Tavares, FL AGENCY: Coast Guard, DHS... regulation on the waters on Lake Dora in Tavares, Florida during the Pro Hydro-X Tour, a series of high-speed... Hydro-X Tour, a series of high-speed personal watercraft races. The Pro Hydro-X Tour will be held on...

  1. 76 FR 36532 - Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ... Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, Horizon Wind...), Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, and Horizon Wind Energy LLC (Complainants) filed a formal complaint against Bonneville Power Administration...

  2. 78 FR 20149 - Sage Quant Management LLC, et al.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ... Quant Management LLC, et al.; Notice of Application March 28, 2013. AGENCY: Securities and Exchange...)(1)(A) and 12(d)(1)(B) of the Act. Applicants: Sage Quant Management LLC (``Adviser''), and Sage Quant ETF Trust (``Trust'') and ETF Distributors LLC. SUMMARY: Summary of Application: Applicants...

  3. 77 FR 74179 - Stingray Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on November 26, 2012, Stingray Pipeline Company, L.L.C. (Stingray), 1100 Louisiana, Suite 3300, Houston, Texas 77002, filed in the above... Roney, Manager--Regulatory Affairs, Stingray Pipeline Company, L.L.C., 1100 Louisiana, Suite 3300...

  4. 76 FR 51082 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ...., International Securities Exchange LLC, The NASDAQ Stock Market LLC, New York Stock Exchange LLC, NYSE Amex LLC... include all remaining National Market System (``NMS'') stocks (``Phase III Securities'').\\9\\ The new pilot... executions, so that the rule will continue to operate in the same manner after changes to the single stock...

  5. 77 FR 788 - Southern LNG Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-31-000] Southern LNG Company, L.L.C.; Notice of Application Take notice that on December 15, 2011, Southern LNG Company, L.L.C... Affairs, Southern LNG Company, L.L.C., 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, by...

  6. 76 FR 71961 - Elba Express Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-11-000] Elba Express Company, L.L.C.; Notice of Application Take notice that on October 31, 2011, Elba Express Company, L.L.C... directed to Glenn A. Sheffield, Director, Rates & Regulatory Affairs, Elba Express Company, L.L.C., 569...

  7. 6. INTERIOR VIEW OF CROSSCUT HYDRO PLANT, SHOWING 25 CYCLE60 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. INTERIOR VIEW OF CROSSCUT HYDRO PLANT, SHOWING 25 CYCLE-60 CYCLE FREQUENCY CHANGER Photographer unknown, December 14, 1940 - Cross Cut Hydro Plant, North Side of Salt River, Tempe, Maricopa County, AZ

  8. 77 FR 68115 - Millennium Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ...] Millennium Pipeline Company, L.L.C.; Notice of Application Take notice that on November 1, 2012, Millennium Pipeline Company, L.L.C. (Millennium), One Blue Hill Plaza, Seventh Floor, P.O. Box 1565, Pearl River, New... system to the existing interconnection with Algonquin Gas Transmission, L.L.C. in Ramapo, New York and...

  9. 75 FR 51989 - Southern LNG Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... Company, L.L.C.; Notice of Application August 16, 2010. Take notice that on August 4, 2010, Southern LNG Company, L.L.C. (Southern LNG), Post Office Box 2563, Birmingham, Alabama 35202-2563, filed in the above.... Sheffield, Director--Rates and Regulatory, Southern LNG Company, L.L.C., 569 Brookwood Village, Suite 501...

  10. Initial Testing of the Stainless Steel NaK-Cooled Circuit (SNaKC)

    NASA Technical Reports Server (NTRS)

    Garber, Anne; Godfroy, Thomas

    2007-01-01

    An actively pumped alkali metal flow circuit, designed and fabricated at the NASA Marshall Space Flight Center, is currently undergoing testing in the Early Flight Fission Test Facility (EFF-TF). Sodium potassium (NaK) was selected as the primary coolant. Basic circuit components include: simulated reactor core, NaK to gas heat exchanger, electromagnetic liquid metal pump, liquid metal flowmeter, load/drain reservoir, expansion reservoir, test section, and instrumentation. Operation of the circuit is based around the 37-pin partial-array core (pin and flow path dimensions are the same as those in a full core), designed to operate at 33 kWt. This presentation addresses the construction, fill and initial testing of the Stainless Steel NaK-Cooled Circuit (SNaKC).

  11. Ontario Hydro and SGML.

    ERIC Educational Resources Information Center

    Rockley, Ann

    1993-01-01

    Describes how an analysis of Ontario Hydro's conversion of 20,000 pages of paper manuals to online documentation established the scope of the project, provided a set of design criteria, and recommended the use of Standard Generalized Markup Language to create the new documentation and the purchase of the "Dinatext" program to produce it.…

  12. Teacher in Space Christa McAuliffe on the KC-135 for zero-G training

    NASA Image and Video Library

    1986-01-08

    S86-25196 (January 1986) --- Sharon Christa McAuliffe, STS-51L citizen observer/payload specialist, gets a preview of microgravity during a special flight aboard NASA?s KC-135 ?zero gravity? aircraft. McAuliffe will represent the Teacher-in-Space Project aboard the space shuttle Challenger when it launches later this month. This photograph was taken by Keith Meyers of the New York Times. EDITOR?S NOTE: The STS-51L crew members lost their lives in the space shuttle Challenger accident moments after launch on Jan. 28, 1986 from the Kennedy Space Center (KSC). Photo credit: NASA

  13. Amnesia as an impairment of detail generation and binding: evidence from personal, fictional, and semantic narratives in K.C.

    PubMed

    Rosenbaum, R Shayna; Gilboa, Asaf; Levine, Brian; Winocur, Gordon; Moscovitch, Morris

    2009-09-01

    Autobiographical episodic recall involves active simultaneous generation and binding of various elements that were present during the initial experience. Deficits in this reconstructive process may account for some aspects of retrograde amnesia (RA) for personally experienced events. Constructive and reconstructive processes may involve similar mechanisms. If so, patients with extensive anterograde amnesia (AA) and RA should show deficits in non-recollective cognitive domains, such as imagining events that had never been experienced and recounting non-personal narratives, that presumably rely on constructive and re-constructive processes, respectively. To test these possibilities, patient K.C., who has severe AA and RA for personal episodes, was asked to generate fictional events and to recall and recognize details of well-known fairy tales and bible stories. K.C.'s performance on both tasks was better than expected given his severely impaired autobiographical episodic memory (AM), but significantly worse than that of control participants. K.C. was able to create a skeletal outline for both types of narratives, providing sufficient information to convey their gist, but the narratives were fragmented and lacking in detail. This deficit cannot be explained as resulting entirely from deficient stored semantic knowledge, because K.C. was able to discriminate between true and false details of non-personal semantic narratives on a recognition test, which he cannot do for personal events [Gilboa, A., Winocur, G., Rosenbaum, R.S., Poreh, A., Gao, F., Black, S.E., Westmacott, R., & Moscovitch, M. (2006a). Hippocampal contributions to recollection in retrograde and anterograde amnesia. Hippocampus, 16, 966-980]. Thus, retrograde AM impairment may be viewed as both a loss of information as well as a deficit in reconstructive processes that hamper or prevent the binding of information to generate a cohesive, detail-rich memory.

  14. 76 FR 13271 - DeQueen and Eastern Railroad, LLC-Corporate Family Transaction Exemption-Texas, Oklahoma...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ... Eastern Railroad, LLC--Corporate Family Transaction Exemption--Texas, Oklahoma & Eastern Railroad, LLC DeQueen and Eastern Railroad, LLC (DQ&E) and Texas, Oklahoma & Eastern Railroad, LLC (TOE), have filed a... the competitive balance with carriers outside the corporate family. Under 49 U.S.C. 10502(g), the...

  15. Ambient Construction, LLC Information Sheet

    EPA Pesticide Factsheets

    Ambient Construction, LLC (the Company) is located in Tallahassee, Florida. The settlement involves renovation activities conducted at property constructed prior to 1978, located in Tallahassee, Florida.

  16. 75 FR 63466 - Sawgrass Storage LLC; Notice of Petition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Storage LLC; Notice of Petition October 7, 2010. Take notice that on September 27, 2010, Sawgrass Storage LLC (Sawgrass Storage), 3333 Warrenville Road, Suite 630, Lisle, Illinois 60532, filed in Docket No..., Sawgrass Storage proposes to drill a test well to determine the feasibility of developing a depleted...

  17. 78 FR 3042 - J.P. Morgan Securities LLC, et al.; Notice of Application and Temporary Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... Management Inc. (``BSAM''), Bear Stearns Health Innoventures Management, L.L.C. (``BSHIM''), BSCGP Inc. (``BSGCP''), Constellation Growth Capital LLC (``Constellation''), Constellation Ventures Management II, LLC (``Constellation II''), Highbridge Capital Management, LLC (``Highbridge''), JF International...

  18. Tapping rocks for Terror Lake hydro project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sieber, O.V.

    The Terror Lake hydro project in Alaska is described. Terror Lake is a small alpine lake surrounded by barren glacier-scoured, rocky mountain tops and plateaus that do not retain moisture. The method for obtaining more water for the hydro project in Kodiak is unique. The basic program was to dam up the outlet of Terror Lake and raise the water level 170 ft. from approximately 1250 ft. above sea level to 1420 ft. Although the megawatt output of the project is small, the concept of the Terror Lake Project has an epic scale to it.

  19. JWB Companies, LLC Information Sheet

    EPA Pesticide Factsheets

    JWB Companies, LLC (the Company) is located in Jacksonville, Florida. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Jacksonville, Florida.

  20. 77 FR 56693 - Self-Regulatory Organizations; New York Stock Exchange LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ...'' Reflecting the Recent Name Change of NYSE Amex LLC to NYSE MKT LLC September 7, 2012. Pursuant to Section 19...'' with ``NYSE MKT'' to reflect the recent name change of NYSE Amex LLC to NYSE MKT LLC. The text of the... references to ``NYSE Amex'' with ``NYSE MKT'' to reflect the recent name change of NYSE Amex LLC to NYSE MKT...

  1. 75 FR 47587 - Wabash Gas Storage LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... LLC (Petitioner), 1044 North 115th Street, Suite 400, Omaha, NE 68154-4446, filed in Docket No. CP10... Storage LLC, 1044 North 115th Street, Suite 400, Omaha, NE 68154-4446, or by calling (402) 691- 9711...

  2. Cougar Holdings, LLC Information Sheet

    EPA Pesticide Factsheets

    Cougar Holdings, LLC (the Company) is located in Colorado Springs, Colorado. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Denver, Colorado.

  3. Public Notice: Proposed Land Ban Exemption to Ineos USA LLC

    EPA Pesticide Factsheets

    Public notice for proposed Land Ban Exemption Reissuance, for Ineos USA LLC, to continue to inject hazardous waste deep underground in Allen County, OH. EPA plans to reissue a Land Ban Exemption for Ineos USA LLC in Allen Co., OH.

  4. Rock Equity Holdings, LLC

    EPA Pesticide Factsheets

    The EPA is providing notice of an Administrative Penalty Assessment in the form of an Expedited Storm Water Settlement Agreement against Rock Equity Holdings, LLC, for alleged violations at The Cove at Kettlestone/98th Street Reconstruction located at 3015

  5. 77 FR 51837 - Self-Regulatory Organizations; NYSE MKT LLC; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... Amending the NYSE Amex Options LLC Limited Liability Company Agreement To Eliminate Certain Restrictions... Options LLC (``NYSE Amex Options'') Limited Liability Company Agreement (``LLC Agreement'') to eliminate... to amend the LLC Agreement to eliminate certain restrictions relating to the qualification of...

  6. 76 FR 42704 - Sky River LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER11-3277-000; ER11-3277-001] Sky River LLC; Notice of Filing Take notice that, on July 8, 2011, Sky River LLC filed to amend its Open Access Transmission Tariff (OATT) filing, submitted on April 1, 2011 and amended on April 7...

  7. HydroViz: A web-based hydrologic observatory for enhancing hydrology and earth-science education

    NASA Astrophysics Data System (ADS)

    Habib, E. H.; Ma, Y.; Williams, D.

    2010-12-01

    The main goal of this study is to develop a virtual hydrologic observatory (HydroViz) that integrates hydrologic field observations with numerical simulations by taking advantage of advances in hydrologic field & remote sensing data, computer modeling, scientific visualization, and web resources and internet accessibility. The HydroViz system is a web-based teaching tool that can run on any web browsers. It leverages the strength of Google Earth to provide authentic and hands-on activities to improve learning. Evaluation of the HydroViz was performed in three engineering courses (a senior level course and two Introductory courses at two different universities). Evaluation results indicate that HydroViz provides an improvement over existing engineering hydrology curriculum. HydroViz was effective in facilitating students’ learning and understanding of hydrologic concepts & increasing related skills. HydroViz was much more effective for students in engineering hydrology classes rather than at the freshmen introduction to civil engineering class. We found that HydroViz has great potential for freshmen audience. Even though HydroViz was challenging to some freshmen, most of them still learned the key concepts and the tool increased the enthusiasm for half of the freshmen. The evaluation provided suggestions to create a simplified version of HydroViz for freshmen-level courses students. It identified concepts and tasks that might be too challenging or irrelevant to the freshmen and areas where we could provide more guidance in the tool. After the first round of evaluation, the development team has made significant improvements to HydroViz, which would further improve its effectiveness for next round of class applications which is planned for the Fall of 2010 to take place in 5 classes at 4 different institutions.

  8. 78 FR 64020 - Manufacturer of Controlled Substances, Notice of Registration, Siegfried USA, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ..., Notice of Registration, Siegfried USA, LLC The Notice dated July 23, 2013, and published in the Federal Register on August 1, 2013, 78 FR 46613, page 18338, Siegfried (USA), LLC., 33 Industrial Park Road...), and Poppy Straw Concentrate (9670). On August 6, 2013, Siegfried (USA), LLC., subsequently withdrew...

  9. 77 FR 23472 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on April 4, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in the..., Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002...

  10. 78 FR 6313 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on January 14, 2013, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in... directed to Thomas G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C. 1001 Louisiana...

  11. 77 FR 76319 - Self-Regulatory Organizations; BOX Options Exchange LLC; Order Approving Minor Rule Violation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-27

    ... Organizations; BOX Options Exchange LLC; Order Approving Minor Rule Violation Plan for BOX Options Exchange LLC December 20, 2012. On October 15, 2012, BOX Options Exchange LLC (the ``Exchange'') filed with the... Rule 19d-1(c)(2) under the Act,\\13\\ that the proposed MRVP for BOX Options Exchange LLC, File No. 4-655...

  12. 75 FR 22628 - Cadence Innovation, LLC, Groesbeck Plant, Including On-Site Leased Workers from Michigan Staffing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... Human Capital Staffing (TA-W-64,715C); Cadence Innovation, LLC, Hillsdale Plant, Hillsdale, Michigan... Innovation, LLC, Groesbeck Plant, Including On-Site Leased Workers from Michigan Staffing, LLC, Modern Professional Services, LLC, TAC Transportation, Time Services, Inc., and Human Capital Staffing Clinton...

  13. 78 FR 30333 - Manufacturer of Controlled Substances; Notice of Registration; Siegfried (Usa), Llc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ...; Notice of Registration; Siegfried (Usa), Llc. By Notice dated November 19, 2012, and published in the Federal Register on November 27, 2012, 77 FR 70825, Siegfried (USA), LLC., 33 Industrial Park Road... 21 U.S.C. 823(a) and determined that the registration of Siegfried (USA), LLC., to manufacture the...

  14. 78 FR 64020 - Manufacturer of Controlled Substances; Notice of Registration; Siegfried USA, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...; Notice of Registration; Siegfried USA, LLC By Notice dated May 22, 2013, and published in the Federal Register on May 30, 2013, 78 FR 32458, Siegfried USA, LLC., 33 Industrial Park Road, Pennsville, New Jersey... determined that the registration of Siegfried USA, LLC., to manufacture the listed basic class of controlled...

  15. 77 FR 8247 - Tennessee Gas Pipeline Company, L.L.C. Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... Pipeline Company, L.L.C. Notice of Application Take notice that on February 2, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in Docket... Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420...

  16. 77 FR 43277 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on July 6, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in the above referenced... Company, L.L.C. 1001 Louisiana Street, Houston, Texas 77002, or telephone (713) 420- 3299, or facsimile...

  17. 75 FR 51031 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... Pipeline Company of America LLC; Notice of Application August 12, 2010. Take notice that on July 30, 2010, Natural Gas Pipeline Company of America LLC (Natural Gas), 3250 Lacey Road, Suite 700, Downers Grove..., Regulatory Products and Services, Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, Suite 700...

  18. 78 FR 67350 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Pipeline Company of America LLC; Notice of Application Take notice that on October 18, 2013 Natural Gas Pipeline Company of America LLC (Natural), at 3250 Lacey Road, Downers Grove, IL 60615, filed an..., Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, Suite 700, Downers Grove, IL 60515, or by...

  19. 76 FR 30974 - Jason Incorporated, Janesville Accoustics Division, Subsidiary of Jason Partners Holdings LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... of Jason Incorporated, Janesville Acoustics Division, Subsidiary of Jason Partners Holdings LLC... Incorporated, Janesville Acoustics Division, Subsidiary of Jason Partners Holdings LLC to be considered leased... Incorporated, Janesville Acoustics Division, Subsidiary of Jason Partners Holdings LLC. The amended notice...

  20. Test results of smart aircraft fastener for KC-135 structural integrity

    NASA Astrophysics Data System (ADS)

    Schoess, Jeffrey N.; Seifert, Greg

    1998-07-01

    Hidden and inaccessible corrosion in aircraft structures is the number one logistics problem for the US Air Force, with an estimated maintenance cost in excess of $LR 1.0B per year in 1990-equivalent dollars. The Smart Aircraft Fastener Evaluation (SAFE) system was developed to provide early warning detection of corrosion-related symptoms in hidden locations of aircraft structures. The SAFE system incorporates an in situ measurement approach that measures and autonomously records several environmental conditions within a Hi-Lok aircraft fastener that could cause corrosion. The SAFE system integrates a miniature electrochemical microsensor array and a time-of-wetness sensor with an ultra low power 8-bit microcontroller and 4- Mbyte solid-state FLASH archival memory to measure evidence of active corrosion. A summary of the technical approach and a detailed analysis of the KC-135 lap joint test coupon results are presented.

  1. Real-time tracking of objects for a KC-135 microgravity experiment

    NASA Technical Reports Server (NTRS)

    Littlefield, Mark L.

    1994-01-01

    The design of a visual tracking system for use on the Extra-Vehicular Activity Helper/Retriever (EVAHR) is discussed. EVAHR is an autonomous robot designed to perform numerous tasks in an orbital microgravity environment. Since the ability to grasp a freely translating and rotating object is vital to the robot's mission, the EVAHR must analyze range image generated by the primary sensor. This allows EVAHR to locate and focus its sensors so that an accurate set of object poses can be determined and a grasp strategy planned. To test the visual tracking system being developed, a mathematical simulation was used to model the space station environment and maintain dynamics on the EVAHR and any other free floating objects. A second phase of the investigation consists of a series of experiments carried out aboard a KC-135 aircraft flying a parabolic trajectory to simulate microgravity.

  2. KC-135A in flight - closeup of winglet with attached tufts

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A chase plane view of the tufts on the KC-135 winglet. The use of tufts in flight research dates back to the early days of the NACA, and remains an effective means of observing airflow even today. In this procedure, rows of strings are attached to an airplane's surface, with one end of each string taped to the airplane and the other end free to swing about in the airflow. The movements of the tufts are photographed by on-board cameras or a chase plane. If the tufts are arrayed in neat rows, as seen here, then the airflow is smooth over the airplane's surface. If, however, they are moving about violently, it suggests turbulent airflow. Such motions may indicate high drag, flow separation (such as in a stall), or buffeting. In some cases, tufts will actually point forward, indicating the airflow has reversed direction.

  3. 78 FR 55251 - Southeast Supply Header, LLC; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... Supply Header, LLC; Notice of Request Under Blanket Authorization Take notice that on August 23, 2013, Southeast Supply Header, LLC (SESH), P.O. Box 1642, Houston, Texas 77251-1642, filed in Docket No. CP13-537... Southeast Supply Header, LLC et al, 119 FERC ] 61,153 (2007). SESH proposes to offset and replace...

  4. 76 FR 52028 - Self-Regulatory Organizations; New York Stock Exchange LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... individual stock trading pause pursuant to the Pause Pilot on the primary listing market and those..., The NASDAQ Stock Market LLC, New York Stock Exchange LLC, NYSE Amex LLC, NYSE Arca, Inc., National...-Regulatory Organizations; New York Stock Exchange LLC; Notice of Filing and Immediate Effectiveness of...

  5. 75 FR 61467 - Desert Southwest Power, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-54-000] Desert Southwest Power, LLC; Notice of Filing September 27, 2010. Take notice that on September 24, 2010, Desert Southwest Power, LLC (Desert Southwest) supplemented the responses filed on September 10, 2010 with...

  6. 75 FR 57761 - Desert Southwest Power, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-54-000] Desert Southwest Power, LLC; Notice of Filing September 14, 2010. Take notice that on September 10, 2010, Desert Southwest Power, LLC (Desert Southwest) filed responses to the Federal Energy Regulatory Commission's...

  7. 78 FR 39721 - Constitution Pipeline Company, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ...] Constitution Pipeline Company, LLC; Notice of Application Take notice that on June 13, 2013, Constitution Pipeline Company, LLC (Constitution), having its principal place of business at 2800 Post Oak Boulevard..., Chenango, Delaware, and Schoharie Counties, New York.\\1\\ Constitution further requests that the Commission...

  8. Microwave-Assisted Hydro-Distillation of Essential Oil from Rosemary: Comparison with Traditional Distillation

    PubMed Central

    Moradi, Sara; Fazlali, Alireza; Hamedi, Hamid

    Background: Hydro-distillation (HD) method is a traditional technique which is used in most industrial companies. Microwave-assisted Hydro-distillation (MAHD) is an advanced HD technique utilizing a microwave oven in the extraction process. Methods: In this research, MAHD of essential oils from the aerial parts (leaves) of rosemary (Rosmarinus officinalis L.) was studied and the results were compared with those of the conventional HD in terms of extraction time, extraction efficiency, chemical composition, quality of the essential oils and cost of the operation. Results: Microwave hydro-distillation was superior in terms of saving energy and extraction time (30 min, compared to 90 min in HD). Chromatography was used for quantity analysis of the essential oils composition. Quality of essential oil improved in MAHD method due to an increase of 17% in oxygenated compounds. Conclusion: Consequently, microwave hydro-distillation can be used as a substitute of traditional hydro-distillation. PMID:29296263

  9. Microwave-Assisted Hydro-Distillation of Essential Oil from Rosemary: Comparison with Traditional Distillation.

    PubMed

    Moradi, Sara; Fazlali, Alireza; Hamedi, Hamid

    2018-01-01

    Hydro-distillation (HD) method is a traditional technique which is used in most industrial companies. Microwave-assisted Hydro-distillation (MAHD) is an advanced HD technique utilizing a microwave oven in the extraction process. In this research, MAHD of essential oils from the aerial parts (leaves) of rosemary ( Rosmarinus officinalis L. ) was studied and the results were compared with those of the conventional HD in terms of extraction time, extraction efficiency, chemical composition, quality of the essential oils and cost of the operation. Microwave hydro-distillation was superior in terms of saving energy and extraction time (30 min , compared to 90 min in HD). Chromatography was used for quantity analysis of the essential oils composition. Quality of essential oil improved in MAHD method due to an increase of 17% in oxygenated compounds. Consequently, microwave hydro-distillation can be used as a substitute of traditional hydro-distillation.

  10. 75 FR 41524 - Horton Manufacturing Company, LLC, Tallmadge, OH; Amended Certification Regarding Eligibility To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ... employees of Horton Manufacturing Company, LLC and were not employees of either Wildcomm-Horton Partners... Company, LLC, Tallmadge, OH; Amended Certification Regarding Eligibility To Apply for Worker Adjustment... 11, 2010, applicable to workers of Horton Archery, LLC, formerly known as Wildcomm-Horton Partners...

  11. 75 FR 32221 - Alticor, Inc., Including Access Business Group International, LLC, and Amway Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-07

    ... Access Business Group International, LLC, and Amway Corporation, Including On-Site Leased Workers from... Business Group International, LLC and Amway Corporation. The notice was published in the Federal Register... International, LLC and Amway Corporation. The Department has determined that these workers were sufficiently...

  12. Role of Pumped Storage Hydro Resources in Electricity Markets and System Operation: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ela, E.; Kirby, B.; Botterud, A.

    2013-05-01

    The most common form of utility- sized energy storage system is the pumped storage hydro system. Originally, these types of storage systems were economically viable simply because they displace more expensive generating units. However, over time, as those expensive units became more efficient and costs declined, pumped hydro storage units no longer have the operational edge. As a result, in the current electricity market environment, pumped storage hydro plants are struggling. To offset this phenomenon, certain market modifications should be addressed. This paper will introduce some of the challenges faced by pumped storage hydro plants in today's markets and purposemore » some solutions to those problems.« less

  13. 75 FR 4547 - High Island Offshore System, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... Offshore System, L.L.C.; Notice of Application January 21, 2010. Take notice that on January 12, 2010, High Island Offshore System, L.L.C. (HIOS), 1100 Louisiana St., Houston, Texas 77002, filed in Docket No. CP10... directed to Jeff Molinaro, High Island Offshore System, L.L.C., 1100 Louisiana St., Houston, Texas 77002...

  14. 76 FR 79673 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... Pipeline Company, L.L.C.; Notice of Application On December 9, 2011, Tennessee Gas Pipeline Company, L.L.C... (Commission) an application under section 7(c) of the Natural Gas Act (NGA), as amended, and part 157 of the... Rocan, Senior Counsel, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas...

  15. 40 CFR 721.1880 - Borate(1-), tris(acetato-.kappa.O)hydro-, sodium, (T-4)-.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...)hydro-, sodium, (T-4)-. 721.1880 Section 721.1880 Protection of Environment ENVIRONMENTAL PROTECTION... New Uses for Specific Chemical Substances § 721.1880 Borate(1-), tris(acetato-.kappa.O)hydro-, sodium... substance identified as borate(1-), tris(acetato-.kappa.O)hydro-, sodium, (T-4)- (PMN P-00-0922; CAS No...

  16. 40 CFR 721.1880 - Borate(1-), tris(acetato-.kappa.O)hydro-, sodium, (T-4)-.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...)hydro-, sodium, (T-4)-. 721.1880 Section 721.1880 Protection of Environment ENVIRONMENTAL PROTECTION... New Uses for Specific Chemical Substances § 721.1880 Borate(1-), tris(acetato-.kappa.O)hydro-, sodium... substance identified as borate(1-), tris(acetato-.kappa.O)hydro-, sodium, (T-4)- (PMN P-00-0922; CAS No...

  17. 78 FR 56685 - SourceGas Distribution LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13-540-000] SourceGas Distribution LLC; Notice of Application Take notice that on August 27, 2013, SourceGas Distribution LLC (Source... areas across the Nebraska-Colorado border within which SourceGas may, without further commission...

  18. 76 FR 47576 - DCP Intrastate Network, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR11-120-000] DCP Intrastate Network, LLC; Notice of Filing Take notice that on July 26, 2011, DCP Intrastate Network, LLC filed to provide notice of its cancellation of its Statement of Operating Conditions for Interstate Gas...

  19. 77 FR 31840 - Perryville Gas Storage LLC; Notice of Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-460-000] Perryville Gas Storage LLC; Notice of Amendment Take notice that on May 11, 2012, Perryville Gas Storage LLC (Perryville), Three Riverway, Suite 1350, Houston, Texas 77056, filed in the above referenced docket an application...

  20. Electrodeposition to construct free-standing chitosan/layered double hydroxides hydro-membrane for electrically triggered protein release.

    PubMed

    Zhao, Pengkun; Zhao, Yanan; Xiao, Ling; Deng, Hongbing; Du, Yumin; Chen, Yun; Shi, Xiaowen

    2017-10-01

    In this study, we report the electrodeposition of a chitosan/layered double hydroxides (LDHs) hydro-membrane for protein release triggered by an electrical signal. The electrodeposition was performed in a chitosan and insulin loaded LDHs suspension in the absence of salt. A free-standing chitosan/LDHs hydro-membrane was generated on the electrode with improved mechanical properties, which is dramatically different from the weak hydrogel deposited in the presence of salt. The amount of LDHs in the hydro-membrane affects the optical transmittance and multilayered structure of the hybrid membrane. Compared to the weak chitosan/LDHs hydrogel, the hydro-membrane has a higher insulin loading capacity and the release of insulin is relatively slow. By biasing electrical potentials to the hydro-membrane, the release behavior of insulin can be adjusted accordingly. In addition, the chitosan/LDHs hydro-membrane showed no toxicity to cells. Our results provide a facile method to construct a chitosan/LDHs hybrid multilayered hydro-membrane and suggest the great potential of the hydro-membrane in controlled protein release. Copyright © 2017 Elsevier B.V. All rights reserved.