Sample records for laboratory maintenance ofanopheles

  1. Laboratory equipment maintenance contracts.

    PubMed

    Boudreau, D A; Scheer, W D; Catrou, P G

    1985-12-01

    The increasing level of technical sophistication and complexity found in clinical laboratory instrumentation today more than ever demands careful attention to maintenance service needs. The time-worn caution for careful definition of requirements for acquisition of a system should also carry over to acquisition of maintenance service. Guidelines are presented for specifications of terms and conditions for maintenance service from the perspective of the laboratorian in the automated clinical laboratory.

  2. Laboratory services series: a programmed maintenance system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuxbury, D.C.; Srite, B.E.

    1980-01-01

    The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

  3. Laboratory services series: a master-slave manipulator maintenance program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenness, R. G.; Hicks, R. E.; Wicker, C. D.

    1976-12-01

    The volume of master slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and development of precise procedures for accomplishing the maintenance of 287 installed units. A very satisfactory computer programmed maintenance system has been established at the Laboratory to provide an economical approach to preventive maintenance.

  4. Actinomadura Species: Laboratory Maintenance and Ribosome Engineering.

    PubMed

    Dhakal, Dipesh; Chung, Nguyen Thanh; Rayamajhi, Vijay; Sohng, Jae Kyung

    2017-02-06

    Actinomadura spp. are aerobic, Gram-positive, catalase-positive, non-acid fast, non-motile actinomycetes. Some species of Actinomadura are associated with opportunistic infections in humans. However, many bioactive compounds with pharmaceutical applications can be isolated from various Actinomadura spp. This unit includes general protocols for the laboratory maintenance of Actinomadura spp., including growth in liquid medium, growth on solid agar, long-term storage, and generation of a higher producing strain by ribosome engineering. Actinomadura hibisca P157-2 is used as a prototype for explaining the considerations for efficient laboratory maintenance of Actinomadura spp. © 2017 by John Wiley & Sons, Inc. Copyright © 2017 John Wiley & Sons, Inc.

  5. Burkholderia thailandensis: Growth and Laboratory Maintenance.

    PubMed

    Garcia, Erin C; Cotter, Peggy A

    2016-08-12

    Burkholderia thailandensis is a nonpathogenic Gram-negative bacterium found in tropical soils. Closely related to several human pathogens, its ease of genetic manipulation, rapid growth in the laboratory, and low virulence make B. thailandensis a commonly used model organism. This unit describes the fundamental protocols for in vitro growth and maintenance of B. thailandensis in the laboratory. © 2016 by John Wiley & Sons, Inc. Copyright © 2016 John Wiley & Sons, Inc.

  6. Laboratory Maintenance of Acinetobacter baumannii.

    PubMed

    Jacobs, Anna C; Zurawski, Daniel V

    2014-11-03

    Acinetobacter baumannii has recently drawn great interest in the microbiology research community due to the increase in clinical antibiotic resistance of this organism, and persistence of this bacterial species in the hospital environment. This unit outlines protocols for the growth and maintenance of A. baumannii in the laboratory. Copyright © 2014 John Wiley & Sons, Inc.

  7. Growth and maintenance of Escherichia coli laboratory strains.

    PubMed

    Son, Mike S; Taylor, Ronald K

    2012-11-01

    Escherichia coli is a Gram-negative bacterium, commonly used in both teaching and research laboratories. This unit includes protocols for the growth and maintenance of E. coli in any teaching- or research-associated laboratory. © 2012 by John Wiley & Sons, Inc.

  8. Master--slave manipulators and remote maintenance at the Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenness, R.G.; Wicker, C.D.

    1975-01-01

    The volume of master-slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and the organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and the development of precise procedures for accomplishing the maintenance of 283 installed units. To provide the most economical type of preventive maintenance, a very satisfactory computer- programmed maintenance system has been established at the Laboratory. (auth)

  9. A computer-based maintenance reminder and record-keeping system for clinical laboratories.

    PubMed

    Roberts, B I; Mathews, C L; Walton, C J; Frazier, G

    1982-09-01

    "Maintenance" is all the activity an organization devotes to keeping instruments within performance specifications to assure accurate and precise operation. The increasing use of complex analytical instruments as "workhorses" in clinical laboratories requires more maintenance awareness by laboratory personnel. Record-keeping systems that document maintenance completion and that should prompt the continued performance of maintenance tasks have not kept up with instrumentation development. We report here a computer-based record-keeping and reminder system that lists weekly the maintenance items due for each work station in the laboratory, including the time required to complete each item. Written in BASIC, the system uses a DATABOSS data base management system running on a time-shared Digital Equipment Corporation PDP 11/60 computer with a RSTS V 7.0 operating system.

  10. Saccharopolyspora Species: Laboratory Maintenance and Enhanced Production of Secondary Metabolites.

    PubMed

    Dhakal, Dipesh; Pokhrel, Anaya Raj; Jha, Amit Kumar; Thuan, Nguyen Huy; Sohng, Jae Kyung

    2017-02-06

    Saccharopolyspora spp. are aerobic, Gram-positive, non-acid-fast, and non-motile actinomycetes. Various species of the genus Saccharopolyspora have been reported with an ability to produce various bioactive compounds for pharmaceutical and agricultural uses. This unit includes general protocols for the laboratory maintenance of Saccharopolyspora species, including growth in liquid medium, growth on solid agar, long-term storage, and generation of a higher producer strain by mutagenesis. Saccharopolyspora spinosa ATCC 49460 is used as a prototype for explaining the considerations for efficient laboratory maintenance of Saccharopolyspora spp. Saccharopolyspora spinosa is a producer of spinosad, a prominent insecticide with selective activity against various insects. © 2017 by John Wiley & Sons, Inc. Copyright © 2017 John Wiley & Sons, Inc.

  11. A calibration service for biomedical instrumentation maintenance laboratories.

    PubMed

    Barnes, A; Evans, A L; Job, H M; Laing, R; Smith, D C

    1999-01-01

    An in-house calibration laboratory for the Biomedical Instrumentation Maintenance Services of the hospitals in the West of Scotland was established in 1993. This paper describes the development of this calibration service in the context of an overall quality system and also estimates its costs. Not only does the in-house service have many advantages but it is shown to be cost effective for workloads exceeding 260 items per annum.

  12. Laboratory equipment maintenance: a critical bottleneck for strengthening health systems in sub-Saharan Africa?

    PubMed

    Fonjungo, Peter N; Kebede, Yenew; Messele, Tsehaynesh; Ayana, Gonfa; Tibesso, Gudeta; Abebe, Almaz; Nkengasong, John N; Kenyon, Thomas

    2012-02-01

    Properly functioning laboratory equipment is a critical component for strengthening health systems in developing countries. The laboratory can be an entry point to improve population health and care of individuals for targeted diseases - prevention, care, and treatment of TB, HIV/AIDS, and malaria, plus maternal and neonatal health - as well as those lacking specific attention and funding. We review the benefits and persistent challenges associated with sustaining laboratory equipment maintenance. We propose equipment management policies as well as a comprehensive equipment maintenance strategy that would involve equipment manufacturers and strengthen local capacity through pre-service training of biomedical engineers. Strong country leadership and commitment are needed to assure development and sustained implementation of policies and strategies for standardization of equipment, and regulation of its procurement, donation, disposal, and replacement.

  13. Marshburn performs in-flight maintenance to APS in the U.S. Laboratory

    NASA Image and Video Library

    2013-02-01

    ISS034-E-038131 (1 Feb. 2013) --- NASA astronaut Tom Marshburn, Expedition 34 flight engineer, performs in-flight maintenance in the International Space Station’s Destiny laboratory, making some upgrades to automated payload switches (APS) for various racks and experiments.

  14. Marshburn performs in-flight maintenance to APS in the U.S. Laboratory

    NASA Image and Video Library

    2013-02-01

    ISS034-E-038128 (1 Feb. 2013) --- NASA astronaut Tom Marshburn, Expedition 34 flight engineer, performs in-flight maintenance in the International Space Station’s Destiny laboratory, making some upgrades to automated payload switches (APS) for various racks and experiments.

  15. Maintenance of the Language Laboratory. ERIC Focus Reports on the Teaching of Foreign Languages, Number 28.

    ERIC Educational Resources Information Center

    Medley, Frank W.

    The purpose of this report is to identify the various aspects of language laboratory operation and maintenance as they relate to the teacher and the administrator, and to suggest certain practices which will result in more effective utilization of the installation. Discussion of the language laboratory includes: (1) selection of personnel, (2)…

  16. Software Engineering Laboratory (SEL) Data Base Maintenance System (DBAM) user's guide and system description

    NASA Technical Reports Server (NTRS)

    Lo, P. S.; Card, D.

    1983-01-01

    The Software Engineering Laboratory (SEL) Data Base Maintenance System (DBAM) is explained. The various software facilities of the SEL, DBAM operating procedures, and DBAM system information are described. The relationships among DBAM components (baseline diagrams), component descriptions, overlay descriptions, indirect command file listings, file definitions, and sample data collection forms are provided.

  17. Tetrahymena in the laboratory: strain resources, methods for culture, maintenance, and storage.

    PubMed

    Cassidy-Hanley, Donna M

    2012-01-01

    The ciliated protozoan Tetrahymena thermophila has been an important model system for biological research for many years. During that time, a variety of useful strains, including highly inbred stocks, a collection of diverse mutant strains, and wild cultivars from a variety of geographical locations have been identified. In addition, thanks to the efforts of many different laboratories, optimal conditions for growth, maintenance, and storage of Tetrahymena have been worked out. To facilitate the efficient use of Tetrahymena, especially by those new to the system, this chapter presents a brief description of many available Tetrahymena strains and lists possible resources for obtaining viable cultures of T. thermophila and other Tetrahymena species. Descriptions of commonly used media, methods for cell culture and maintenance, and protocols for short- and long-term storage are also presented. Copyright © 2012 Elsevier Inc. All rights reserved.

  18. NHEXAS PHASE I REGION 5 STUDY--STANDARD OPERATING PROCEDURE FOR PROPER USE AND MAINTENANCE OF LABORATORY NOTEBOOKS (NHX/SOP-120-001)

    EPA Science Inventory

    This procedure describes in detail the rules and regulations governing the proper use and maintenance of laboratory notebooks. The purpose of laboratory notebooks was to provide a permanent legal record of experimental procedures and results. Thus, the laboratory notebook served ...

  19. Final Report for the Arroyo Las Positas Maintenance Impact Study, Lawrence Livermore National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    van Hattem, M; Paterson, L

    2006-01-12

    In 2000, the Lawrence Livermore National Laboratory's (LLNL) Environmental Protection Department, in coordination with Plant Engineering (PE), began dredging sections of the Arroyo Las Positas (ALP) to alleviate concerns about flooding of sensitive facilities within the mainsite of Lawrence Livermore National Laboratory. In order to reduce potential impacts on the federally threatened California red-legged frog (Rana aurora draytonii), LLNL proposed to dredge sections of the ALP in a ''checkerboard pattern'', resulting in a mosaic of open water habitat and vegetated sections (Figure 1). The Arroyo Las Positas Management Plan (Plan) was coordinated with both state and federal agencies including themore » U.S. Fish and Wildlife Service (USFWS), California Department of Fish and Game (CDF&G), San Francisco Regional Water Quality Control Board (SFRWQCB), and the Army Corp of Engineers (ACOE). Water Discharge Requirements (WDRs) were issued for this project on December 30, 1999 (Order No. 99-086) by the SFRWQCB. Provision 19 of the WDRs outlined a five-year (2000 through 2004) Maintenance Impact Study (MIS) that LLNL began in coordination with dredging work that was conducted as part of the Arroyo Las Positas Management Plan. Provision 20 of these WDRs requires LLNL to submit a final report of the results of the Maintenance Impact Study for this project to the SFRWQCB. The purpose of this report is to present the results of the Maintenance Impact Study for Arroyo Las Positas and meet the requirements of Provision 20. A description of the annual monitoring included in this Maintenance Impact Study is included in the methods section of this report. Initially the Plan called for dredging the entire length of the Arroyo Las Positas (approximately 6,981 linear feet) over a 5-year period to minimize temporal impacts on the California red-legged frog. Dredging occurred in 2000 ({approx}1,300 ft.), 2001 ({approx}800 ft.), and 2002 ({approx}1,200 ft.), which constituted

  20. [The maintenance of automatic analysers and associated documentation].

    PubMed

    Adjidé, V; Fournier, P; Vassault, A

    2010-12-01

    The maintenance of automatic analysers and associated documentation taking part in the requirements of the ISO 15189 Standard and the French regulation as well have to be defined in the laboratory policy. The management of the periodic maintenance and documentation shall be implemented and fulfilled. The organisation of corrective maintenance has to be managed to avoid interruption of the task of the laboratory. The different recommendations concern the identification of materials including automatic analysers, the environmental conditions to take into account, the documentation provided by the manufacturer and documents prepared by the laboratory including procedures for maintenance.

  1. Industrial Maintenance Series. Educational Resources for the Machine Tool Industry. Course Syllabi, Instructor's Handbook, [and] Student Laboratory Manual.

    ERIC Educational Resources Information Center

    Texas State Technical Coll. System, Waco.

    This package consists of course syllabi, an instructor's handbook, and a student laboratory manual for a 1-year vocational training program to prepare students for entry-level employment as industrial maintenance technicians. The program was developed through a modification of the DACUM (Developing a Curriculum) technique. The course syllabi…

  2. Empirical and Face Validity of Software Maintenance Defect Models Used at the Jet Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    Taber, William; Port, Dan

    2014-01-01

    At the Mission Design and Navigation Software Group at the Jet Propulsion Laboratory we make use of finite exponential based defect models to aid in maintenance planning and management for our widely used critical systems. However a number of pragmatic issues arise when applying defect models for a post-release system in continuous use. These include: how to utilize information from problem reports rather than testing to drive defect discovery and removal effort, practical model calibration, and alignment of model assumptions with our environment.

  3. Laboratory culture and maintenance of Stenotrophomonas maltophilia.

    PubMed

    Mahdi, Osama; Eklund, Bridget; Fisher, Nathan

    2014-02-06

    Stenotrophomonas maltophilia is a ubiquitous soil bacterium that is increasingly recognized as an emerging nosocomial pathogen. This unit includes protocols for the in vitro growth and maintenance of S. maltophilia. Copyright © 2014 John Wiley & Sons, Inc.

  4. Check-off logs for routine equipment maintenance.

    PubMed

    Brewster, M A; Carver, P H; Randolph, B

    1995-12-01

    The regulatory requirement for appropriate routine instrument maintenance documentation is approached by laboratories in numerous ways. Standard operating procedures (SOPs) may refer to maintenance listed in instrument manuals, may indicate "periodic" performance of an action, or may indicate specific tasks to be performed at certain frequencies. The Quality Assurance Unit (QAU) task of assuring the performance of these indicated maintenance tasks can be extremely laborious if these records are merged with other analysis records. Further, the lack of written maintenance schedules often leads to omission of infrequently performed tasks. We recommend creation of routine maintenance check-off logs for instruments with tasks grouped by frequency of expected performance. Usage of such logs should result in better laboratory compliance with SOPs and the compliance can be readily monitored by QAU or by regulatory agencies.

  5. WHC Maintenance

    NASA Image and Video Library

    2009-04-28

    ISS019-E-011464 (28 April 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 19/20 flight engineer, performs in-flight maintenance on the waste and hygiene compartment located in the Destiny laboratory of the International Space Station.

  6. WHC Maintenance

    NASA Image and Video Library

    2009-04-28

    ISS019-E-011471 (28 April 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 19/20 flight engineer, performs in-flight maintenance on the waste and hygiene compartment located in the Destiny laboratory of the International Space Station.

  7. Laboratory maintenance of Treponema denticola.

    PubMed

    Fenno, J Christopher

    2005-10-01

    This unit describes the methods, media, and equipment necessary for routine laboratory culture and handling of the anaerobic oral spirochete Treponema denticola. Topics discussed include nutrient requirements, recommended media formulations, and expected growth kinetics, as well as methods and equipment necessary to maintain anaerobic conditions. An additional protocol on isolation of T. denticola from clinical samples is included.

  8. Maintenance action readiness assessment plan for White Oak Creek and Melton Branch Weir Stilling Pool cleanout at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is wellmore » below the US Environmental Protection Agency`s level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830.« less

  9. Workflow and maintenance characteristics of five automated laboratory instruments for the diagnosis of sexually transmitted infections.

    PubMed

    Ratnam, Sam; Jang, Dan; Gilchrist, Jodi; Smieja, Marek; Poirier, Andre; Hatchette, Todd; Flandin, Jean-Frederic; Chernesky, Max

    2014-07-01

    The choice of a suitable automated system for a diagnostic laboratory depends on various factors. Comparative workflow studies provide quantifiable and objective metrics to determine hands-on time during specimen handling and processing, reagent preparation, return visits and maintenance, and test turnaround time and throughput. Using objective time study techniques, workflow characteristics for processing 96 and 192 tests were determined on m2000 RealTime (Abbott Molecular), Viper XTR (Becton Dickinson), cobas 4800 (Roche Molecular Diagnostics), Tigris (Hologic Gen-Probe), and Panther (Hologic Gen-Probe) platforms using second-generation assays for Chlamydia trachomatis and Neisseria gonorrhoeae. A combination of operational and maintenance steps requiring manual labor showed that Panther had the shortest overall hands-on times and Viper XTR the longest. Both Panther and Tigris showed greater efficiency whether 96 or 192 tests were processed. Viper XTR and Panther had the shortest times to results and m2000 RealTime the longest. Sample preparation and loading time was the shortest for Panther and longest for cobas 4800. Mandatory return visits were required only for m2000 RealTime and cobas 4800 when 96 tests were processed, and both required substantially more hands-on time than the other systems due to increased numbers of return visits when 192 tests were processed. These results show that there are substantial differences in the amount of labor required to operate each system. Assay performance, instrumentation, testing capacity, workflow, maintenance, and reagent costs should be considered in choosing a system. Copyright © 2014, American Society for Microbiology. All Rights Reserved.

  10. Laboratory Cultivation and Maintenance of Borrelia miyamotoi.

    PubMed

    Stone, Brandee L; Brissette, Catherine A

    2016-08-12

    Borrelia miyamotoi is a relapsing fever tick-borne pathogen found in Ixodes spp. (hard) ticks. In vitro culturing has proven difficult despite initial reports of cultures maintained in Barbour-Stoenner-Kelly-II (BSK-II) medium. The ability to culture in vitro opens many avenues for investigating the genetics and physiology of bacterial species. This unit describes methods for the maintenance and cultivation of B. miyamotoi in liquid medium. © 2016 by John Wiley & Sons, Inc. Copyright © 2016 John Wiley & Sons, Inc.

  11. The Language Laboratory.

    ERIC Educational Resources Information Center

    Hocking, Elton

    This condensed article on the language laboratory describes educational and financial possibilities and limitations, often citing the foreign language program at Purdue University as an example. The author discusses: (1) costs and amortization, (2) preventive maintenance, (3) laboratory design, (4) the multichannel recorder, and (5) visuals. Other…

  12. Advanced servomanipulator remote maintenance demonstration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, E.C.; Ladd, L.D.

    1988-01-01

    The Fuel Recycle Division (FRD) of the Oak Ridge National Laboratory (ORNL) is developing remote maintenance systems for the Consolidated Fuel Reprocessing Program for applications in future nuclear fuel cycle facilities. The most recent development is the advanced servomanipulator (ASM), a digitally controlled, force-reflecting, dual-arm, master/slave servomanipulator. A unique feature of ASM is that the slave arms are remotely maintainable. The ASM slave arms are composed of modules, each of which is capable of being removed and replaced by another manipulator system. The intent of this test was to demonstrate that the ASM slave arms could be completely disassembled andmore » reassembled remotely. This remote maintenance demonstration was performed using the Remote Operations and Maintenance Demonstration (ROMD) facility model M-2 servomanipulator maintenance system. Maintenance of ASM was successfully demonstrated using the M-2 servomanipulator and special fixtures. Recommendations, generally applicable to other remotely maintained equipment, have been made for maintainability improvements. 3 refs., 5 figs.« less

  13. A Laboratory Maintenance Regime for a Fungus-Growing Termite Macrotermes gilvus (Blattodea: Termitidae).

    PubMed

    Lee, Ching-Chen; Lee, Chow-Yang

    2015-06-01

    The optimum maintenance conditions of the fungus-growing termite, Macrotermes gilvus (Hagen) (Blattodea: Termitidae), in the laboratory were studied. Termites were kept on a matrix of moist sand and with fungus comb as food. The survival of groups of termites was measured when maintained at different population densities by changing group size and container volume. Larger groups (≥0.6 g) were more vigorous and had significant higher survival rates than smaller groups (≤0.3 g). The population density for optimal survival of M. gilvus is 0.0025 g per container volume (ml) or 0.0169 g per matrix volume (cm(3)), i.e., 1.2 g of termites kept in a 480-ml container filled with 71 cm3 of sand. In termite groups of smaller size (i.e., 0.3 g) or groups maintained in smaller container (i.e., 100 ml) the fungus comb was overgrown with Xylaria spp., and subsequently all termites died within the study period. The insufficient number of workers for regulating the growth of unwanted fungi other than Termitomyces spp. in the fungus comb is the most likely reason. Unlike some other mound-building termite species, M. gilvus showed satisfactory survival when maintained in non-nutritious matrix (i.e., sand). There was no significant difference in the survival rate between different colonies of M. gilvus (n=5), with survival in the range of 78.5-84.4% after 4 wk. Advances in the maintenance of Macrotermes will enable researchers to study with more biological relevance many aspects of the biology, behavior, and management of this species. © The Authors 2015. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  14. Laboratory Activity on Sample Handling and Maintaining a Laboratory Notebook through Simple pH Measurements

    ERIC Educational Resources Information Center

    Erdmann, Mitzy A.; March, Joe L.

    2016-01-01

    Sample handling and laboratory notebook maintenance are necessary skills but can seem abstract if not presented to students in context. An introductory exercise focusing on proper sample handling, data collection and laboratory notebook keeping for the general chemistry laboratory was developed to emphasize the importance of keeping an accurate…

  15. Field Responses of Anopheles gambiae Complex (Diptera: Culicidae) in Liberia using Yeast-Generated Carbon Dioxide and Synthetic Lure-Baited Light Traps

    DTIC Science & Technology

    2013-07-01

    ofAnopheles gambiae sensu stricto (Giles), Anopheles melas Theobald and possibly Anopheles arabiensis Patton, although the presence and distribution of the...Liberia (Stojanovich and Scott 1966), of which An. gambiae (n 149) comprised 32% (Fig. 1), in- cluding a single An. melas (Table 2). An. gambiae s. s...other member of the An. gambiae complex captured in our studywasAn. melas , a brack- ish water species known to develop in semimonthly spring-tide pools

  16. A Population Genetics Study of Anopheles Darlingi (Diptera: Culicidae) from Colombia Based on Random Amplified Polymorphic DNA-Polymerase Chain Reaction and Amplified Fragment Length Polymorphism Markers

    DTIC Science & Technology

    2007-06-01

    Biology of Disease Vectors, University Press of Colorado. Niwot, co. p. 417-437. Tadei WI’, Santos JMN, Rabbani MG 1982. Biologia de anofelinos amazonicos...wR 4𔃼.0 Mem Inst Oswaldo Cruz, Rio de Janeiro, Vol. 102(3): 255-262, June 2007 255 A population genetics study ofAnopheles darlingi (Diptera... de Ciencias y rdcullad de Salud. Universidad del Valle, (’.ali, Colombia *Depanment of Entomology, Walter Reed Army Institute of Research. Silver

  17. Safety in the Chemical Laboratory: The Selection of Eyewash Stations for Laboratory Use.

    ERIC Educational Resources Information Center

    Walters, Douglas B.; And Others

    1988-01-01

    Evaluates and compares common eyewash stations currently being used in laboratories. Discusses types available, installation, water supply needs, and maintenance. Lists current OSHA eyewash station standards. (ML)

  18. Safety in the Chemical Laboratory: Fire Safety and Fire Control in the Chemistry Laboratory.

    ERIC Educational Resources Information Center

    Wilbraham, A. C.

    1979-01-01

    Discusses fire safety and fire control in the chemistry laboratory. The combustion process, extinguishing equipment, extinguisher maintenance and location, and fire safety and practices are included. (HM)

  19. Building an experience factory for maintenance

    NASA Technical Reports Server (NTRS)

    Valett, Jon D.; Condon, Steven E.; Briand, Lionel; Kim, Yong-Mi; Basili, Victor R.

    1994-01-01

    This paper reports the preliminary results of a study of the software maintenance process in the Flight Dynamics Division (FDD) of the National Aeronautics and Space Administration/Goddard Space Flight Center (NASA/GSFC). This study is being conducted by the Software Engineering Laboratory (SEL), a research organization sponsored by the Software Engineering Branch of the FDD, which investigates the effectiveness of software engineering technologies when applied to the development of applications software. This software maintenance study began in October 1993 and is being conducted using the Quality Improvement Paradigm (QIP), a process improvement strategy based on three iterative steps: understanding, assessing, and packaging. The preliminary results represent the outcome of the understanding phase, during which SEL researchers characterized the maintenance environment, product, and process. Findings indicate that a combination of quantitative and qualitative analysis is effective for studying the software maintenance process, that additional measures should be collected for maintenance (as opposed to new development), and that characteristics such as effort, error rate, and productivity are best considered on a 'release' basis rather than on a project basis. The research thus far has documented some basic differences between new development and software maintenance. It lays the foundation for further application of the QIP to investigate means of improving the maintenance process and product in the FDD.

  20. Evaluation System and Implementation Countermeasure of Automobile Green Maintenance

    NASA Astrophysics Data System (ADS)

    Zhang, Fei; Xie, Xinxin; Yan, Chaoyong

    2018-01-01

    Green maintenance research is in the beginning of our country, the work is being explored. Based on the existing research results at home and abroad, this paper learns and draws lessons from the experiences and lessons of foreign advanced countries and domestic advanced enterprises. In the face of the challenges brought by economic development and energy saving and emission reduction, this paper discusses the green maintenance theory and security system, And the research status of green maintenance content and system at home and abroad, through the deletion and selection of green maintenance index, through the AHP method to determine the green evaluation criteria, and the introduction of C equivalent evaluation system, the use of fuzzy synthesis Evaluation method to build a green maintenance evaluation model, and the actual validation, put forward the implementation of green maintenance feasibility programs and related security recommendations, vehicle maintenance enterprises to carry out green maintenance, improve business efficiency and reduce environmental management costs to provide theoretical basis. And to achieve effective reduction of environmental pollution, reduce maintenance costs of the target, a reasonable promotion of maintenance and environmental protection and sustainable development. Promote green maintenance from research to practice, from the laboratory to the maintenance of enterprises, from the pilot to the overall development and transformation.

  1. Generalized Maintenance Trainer Simulator: Development of Hardware and Software. Final Report.

    ERIC Educational Resources Information Center

    Towne, Douglas M.; Munro, Allen

    A general purpose maintenance trainer, which has the potential to simulate a wide variety of electronic equipments without hardware changes or new computer programs, has been developed and field tested by the Navy. Based on a previous laboratory model, the Generalized Maintenance Trainer Simulator (GMTS) is a relatively low cost trainer that…

  2. Maintenance Training Simulators Design and Acquisition: Summary of Current Procedures.

    DTIC Science & Technology

    1979-11-01

    of maintenance training and training equipment for new systems . This organization has a core of highly experienced ISD team personnel and has evolved...S LABORATORY AIR FORCE SYSTEMS COMMAND BROOKS AIR FORCE BAbE,TEXAS 78235 ." .~ 8. . NOTI(’F When U.S. Government drawings. specifications. ot otlher...Force personirel in performning 4 Instrutinal Systems Devlopmrent (ISO) analyses to define maintenance training equipment requirements. and byv

  3. Relocation of the Deep Space Network Maintenance Center

    NASA Technical Reports Server (NTRS)

    Beutler, K. F.

    1981-01-01

    The Jet Propulsion Laboratory maintains a Deep Space Network (DSN) maintenance center (DMC), whose task is to engineer and manage the repair and calibration program for the electronic and mechanical equipment used in the tracking stations located at Madrid, Spain, and Canberra, Australia. The DMC also manages the Goldstone complex maintenance facility (GCMF), whose task is to repair and calibrate the Goldstone electronic and mechanical equipment. The rationale for moving the facility to Barstow, California, and the benefits derived from the move are discussed.

  4. ICD Complex Operations and Maintenance Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  5. Sonication standard laboratory module

    DOEpatents

    Beugelsdijk, Tony; Hollen, Robert M.; Erkkila, Tracy H.; Bronisz, Lawrence E.; Roybal, Jeffrey E.; Clark, Michael Leon

    1999-01-01

    A standard laboratory module for automatically producing a solution of cominants from a soil sample. A sonication tip agitates a solution containing the soil sample in a beaker while a stepper motor rotates the sample. An aspirator tube, connected to a vacuum, draws the upper layer of solution from the beaker through a filter and into another beaker. This beaker can thereafter be removed for analysis of the solution. The standard laboratory module encloses an embedded controller providing process control, status feedback information and maintenance procedures for the equipment and operations within the standard laboratory module.

  6. A Virtual Embedded Microcontroller Laboratory for Undergraduate Education: Development and Evaluation

    ERIC Educational Resources Information Center

    Richardson, Jeffrey J.; Adamo-Villani, Nicoletta

    2010-01-01

    Laboratory instruction is a major component of the engineering and technology undergraduate curricula. Traditional laboratory instruction is hampered by several factors including limited access to resources by students and high laboratory maintenance cost. A photorealistic 3D computer-simulated laboratory for undergraduate instruction in…

  7. Data Sharing Report for the Quantification of Removable Activity in Various Surveillance and Maintenance Facilities at the Oak Ridge National Laboratory Oak Ridge TN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, David A.

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (OR-EM) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using American Recovery and Reinvestment Act (ARRA) funds. Specifically, DOE OR-EM requested that ORAU plan and implement a sampling and analysis campaign targeting potential removable radiological contamination that may be transferrable to future personal protective equipment (PPE) and contamination control materials—collectively referred to as PPE throughout the remainder of this report—used in certain URS|CH2M Oak Ridge, LLC (UCOR) Surveillance andmore » Maintenance (S&M) Project facilities at the Oak Ridge National Laboratory (ORNL). Routine surveys in Bldgs. 3001, 3005, 3010, 3028, 3029, 3038, 3042, 3517, 4507, and 7500 continuously generate PPE. The waste is comprised of Tyvek coveralls, gloves, booties, Herculite, and other materials used to prevent worker exposure or the spread of contamination during routine maintenance and monitoring activities. This report describes the effort to collect and quantify removable activity that may be used by the ORNL S&M Project team to develop radiation instrumentation “screening criteria.” Material potentially containing removable activity was collected on smears, including both masselin large-area wipes (LAWs) and standard paper smears, and analyzed for site-related constituents (SRCs) in an analytical laboratory. The screening criteria, if approved, may be used to expedite waste disposition of relatively clean PPE. The ultimate objectives of this effort were to: 1) determine whether screening criteria can be developed for these facilities, and 2) provide process knowledge information for future site planners. The screening criteria, if calculated, must be formally approved by Federal Facility Agreement parties prior to

  8. [Thermolabile drugs: pharmacist intervention as a guarantee of cold chain maintenance].

    PubMed

    Ricote-Lobera, I; Santos-Mena, B; Fraile-Gil, S; Ortiz-Martín, B; Hidalgo-Correas, F J; García-Díaz, B

    2014-05-01

    To determine whether pharmacist is able to guarantee cold chain maintenance of thermolabile drugs during transport using the available information in the reception process and to compare these results with those obtained in a subsequent intervention phase, in which the manufacturing laboratories were contacted. Intervention study, prospective and comparative"before-after". It was analyzed the storage conditions during transport of all thermolabile drugs received in a 400-bed hospital for 3 months, excluding those from clinical trials. The intervention allowed to ensure cold chain maintenance in 76,5% (n = 488) of received drugs, representing an increase of 41,8% (IC 95% 36,7-46,6%; p < 0,001) compared with the percentage obtained before the intervention. The pharmacist isn't able to ensure the cold chain maintenance of received thermolabile drugs without temperature monitoring device (64,6%). Reports requested from laboratories allowed to increase significantly that percentage. Copyright AULA MEDICA EDICIONES 2014. Published by AULA MEDICA. All rights reserved.

  9. Guidelines to Language Teaching in Classroom and Laboratory.

    ERIC Educational Resources Information Center

    Iodice, Don R.

    Guidelines for evaluating, establishing, and administrating classroom and laboratory language programs are offered in this report. Attention is focused on the language laboratory, with sections on its use, scheduling, materials and texts, preparation of audio materials, preparation of tests, supervision, discipline, and maintenance. Briefer…

  10. Toward full life cycle control: Adding maintenance measurement to the SEL

    NASA Technical Reports Server (NTRS)

    Rombach, H. Dieter; Ulery, Bradford T.; Valett, Jon D.

    1992-01-01

    Organization-wide measurement of software products and processes is needed to establish full life cycle control over software products. The Software Engineering Laboratory (SEL)--a joint venture between NASA GSFC, the University of Maryland, and Computer Sciences Corporation--started measurement of software development more than 15 years ago. Recently, the measurement of maintenance was added to the scope of the SEL. In this article, the maintenance measurement program is presented as an addition to the already existing and well-established SEL development measurement program and evaluated in terms of its immediate benefits and long-term improvement potential. Immediate benefits of this program for the SEL include an increased understanding of the maintenance domain, the differences and commonalities between development and maintenance, and the cause-effect relationships between development and maintenance. Initial results from a sample maintenance study are presented to substantiate these benefits. The long-term potential of this program includes the use of maintenance baselines to better plan and manage future projects and to improve development and maintenance practices for future projects wherever warranted.

  11. Parmitano in U.S. Laboratory

    NASA Image and Video Library

    2013-07-30

    ISS036-E-027387 (29 July 2013) --- European Space Agency astronaut Luca Parmitano, Expedition 36 flight engineer, performs maintenance on the Water Pump Assembly 2 / Thermal Control System (WPA2/TCS) in the Columbus laboratory of the International Space Station.

  12. Parmitano in U.S. Laboratory

    NASA Image and Video Library

    2013-07-30

    ISS036-E-027389 (29 July 2013) --- European Space Agency astronaut Luca Parmitano, Expedition 36 flight engineer, performs maintenance on the Water Pump Assembly 2 / Thermal Control System (WPA2/TCS) in the Columbus laboratory of the International Space Station.

  13. Operations and Maintenance Introductory O&M Newsletter | Poster

    Cancer.gov

    The Operations and Maintenance (O&M) department has been serving and supporting the NCI scientific mission since 1972. Our dedicated staff works 24/7 behind the scenes to ensure that the NCI campus and laboratory environments are safe, functional, and reliable, as well as comfortable and aesthetically pleasing.

  14. Aerospace Energy Systems Laboratory - Requirements and design approach

    NASA Technical Reports Server (NTRS)

    Glover, Richard D.

    1988-01-01

    The NASA Ames/Dryden Flight Research Facility operates a mixed fleet of research aircraft employing NiCd batteries in a variety of flight-critical applications. Dryden's Battery Systems Laboratory (BSL), a computerized facility for battery maintenance servicing, has evolved over two decades into one of the most advanced facilities of its kind in the world. Recently a major BSL upgrade was initiated with the goal of modernization to provide flexibility in meeting the needs of future advanced projects. The new facility will be called the Aerospace Energy Systems Laboratory (AESL) and will employ distributed processing linked to a centralized data base. AESL will be both a multistation servicing facility and a research laboratory for the advancement of energy storage system maintenance techniques. This paper describes the baseline requirements for the AESL and the design approach being taken for its mechanization.

  15. 42 CFR 493.1254 - Standard: Maintenance and function checks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Standard: Maintenance and function checks. 493.1254 Section 493.1254 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY REQUIREMENTS Quality System for Nonwaived...

  16. Laboratory procedures manual for the firefly luciferase assay for adenosine triphosphate (ATP)

    NASA Technical Reports Server (NTRS)

    Chappelle, E. W.; Picciolo, G. L.; Curtis, C. A.; Knust, E. A.; Nibley, D. A.; Vance, R. B.

    1975-01-01

    A manual on the procedures and instruments developed for the adenosine triphosphate (ATP) luciferase assay is presented. Data cover, laboratory maintenance, maintenance of bacterial cultures, bacteria measurement, reagents, luciferase procedures, and determination of microbal susceptibility to antibiotics.

  17. Burbank performs maintenance on the light cover for the MSG

    NASA Image and Video Library

    2012-01-16

    ISS030-E-155913 (16 Jan. 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, performs in-flight maintenance on the front stray light cover for the Microgravity Science Glovebox (MSG) in the Destiny laboratory of the International Space Station.

  18. Burbank performs maintenance on the light cover for the MSG

    NASA Image and Video Library

    2012-01-16

    ISS030-E-155912 (16 Jan. 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, performs in-flight maintenance on the front stray light cover for the Microgravity Science Glovebox (MSG) in the Destiny laboratory of the International Space Station.

  19. The Evolution of the Language Laboratory: Changes During Fifteen Years of Operation

    ERIC Educational Resources Information Center

    Stack, Edward M.

    1977-01-01

    This article summarizes conditions and changes in language laboratories. Types of laboratories and equipment are listed; laboratory personnel include technicians, librarians and student assistants. Most maintenance was done by institution personnel; student use is outlined. Professional attitudes and equipment statistics are surveyed. (CHK)

  20. Portable oil bath for high-accuracy resistance transfer and maintenance

    NASA Astrophysics Data System (ADS)

    Shiota, Fuyuhiko

    1999-10-01

    A portable oil bath containing one standard resistor for high-accuracy resistance transfer and maintenance was developed and operated for seven years in the National Research Laboratory of Metrology. The aim of the bath is to save labor and apparatus for high-accuracy resistance transfer and maintenance by consistently keeping the standard resistor in an optimum environmental condition. The details of the prototype system, including its performance, are described together with some suggestions for a more practical bath design, which adopts the same concept.

  1. Nespoli performs periodic maintenance on the PuFF Experiment

    NASA Image and Video Library

    2011-02-14

    ISS026-E-027009 (14 Feb. 2011) --- European Space Agency (ESA) astronaut Paolo Nespoli, Expedition 26 flight engineer, performs periodic maintenance on the Pulmonary Function in Flight (PuFF) experiment by re-greasing the PuFF calibration syringe in the Columbus laboratory of the International Space Station.

  2. 120. ARAI Expansion of ARA627 shop and maintenance building for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    120. ARA-I Expansion of ARA-627 shop and maintenance building for new use as materials and metallurgy laboratory. Shows ground floor plan addition of gas analyzer room, fatigue testing room, microscope room, and offices. Idaho Nuclear Corporation 1230-ARA-627-A-5. Date: June 1970. Ineel index code no. 068-0627-00-400-154062. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  3. Assessing Student Learning in a Virtual Laboratory Environment

    ERIC Educational Resources Information Center

    Wolf, T.

    2010-01-01

    Laboratory experience is a key factor in technical and scientific education. Virtual laboratories have been proposed to reduce cost and simplify maintenance of lab facilities while still providing students with access to real systems. It is important to determine if such virtual labs are still effective for student learning. In the assessment of a…

  4. Aerospace energy systems laboratory: Requirements and design approach

    NASA Technical Reports Server (NTRS)

    Glover, Richard D.

    1988-01-01

    The NASA Ames-Dryden Flight Research Facility at Edwards, California, operates a mixed fleet of research aircraft employing nickel-cadmium (NiCd) batteries in a variety of flight-critical applications. Dryden's Battery Systems Laboratory (BSL), a computerized facility for battery maintenance servicing, has developed over two decades into one of the most advanced facilities of its kind in the world. Recently a major BSL upgrade was initiated with the goal of modernization to provide flexibility in meeting the needs of future advanced projects. The new facility will be called the Aerospace Energy Systems Laboratory (AESL) and will employ distributed processing linked to a centralized data base. AESL will be both a multistation servicing facility and a research laboratory for the advancement of energy storage system maintenance techniques. This paper describes the baseline requirements for the AESL and the design approach being taken for its mechanization.

  5. Mapping Operation and Maintenance Strategy for U.S. Offshore Wind Farms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dewan, Ashish; Stehly, Tyler

    This presentation provides an overview of a collaborative effort between ECN and the National Renewable Energy Laboratory that focused on an operation and maintenance study of six offshore wind power plants in the United States.

  6. Maintenance and Testing of Fume Cupboard

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hussein, Falah H.; Al-Dahhan, Wedad H.; Al-Zuhairi, Ali Jassim

    Scientists at universities across Iraq are actively working to report actual incidents and accidents occurring in their laboratories, as well as structural improvements made to improve safety and security, to raise awareness and encourage openness, leading to widespread adoption of robust Chemical Safety and Security (CSS) practices. This manuscript highlights the importance of periodic maintenance on fume cupboards, and is the fourth in a series of five case studies describing laboratory incidents, accidents, and laboratory improvements. In this study, we describe a situation in which the ventilation capacity of the fume cupboard in the undergraduate chemistry laboratories at Al-Nahrain Universitymore » had decreased to an unacceptable level. The CSS Committee investigated and found the ducting system had been blocked by plastic sheets and dead birds. All the ducts have since been cleaned, and four extra ventilation fans have been installed to further increase ventilation capacity. By openly sharing what happened along with the lessons learned from the accident, we hope to minimize the possibility of another researcher being injured in a similar incident in the future.« less

  7. National and international veterinary reference laboratories for infectious diseases.

    PubMed

    Edwards, S; Alexander, D

    1998-08-01

    Reference laboratories play an increasingly important role in the harmonisation of laboratory diagnostic tests and the standardisation of veterinary vaccines. This is particularly important in building confidence between international trading partners. The authors review aspects of the organisation, designation and support of reference laboratories for infectious diseases of animals and discuss the principal activities which such laboratories would normally perform. These activities include advice and consultancy, publications and communication, training, research, disease surveillance, maintenance of culture collections, evaluation of reference methods, preparation of reference materials and organisation of inter-laboratory comparisons.

  8. 8. ARAI Shop and maintenance building ARA627 interior view. Remains ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. ARA-I Shop and maintenance building ARA-627 interior view. Remains of cabinetry and electrical switch panel in one of rooms. Ineel photo no. 1-11. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  9. XML syntax for clinical laboratory procedure manuals.

    PubMed

    Saadawi, Gilan; Harrison, James H

    2003-01-01

    We have developed a document type description (DTD) in Extensable Markup Language (XML) for clinical laboratory procedures. Our XML syntax can adequately structure a variety of procedure types across different laboratories and is compatible with current procedure standards. The combination of this format with an XML content management system and appropriate style sheets will allow efficient procedure maintenance, distributed access, customized display and effective searching across a large body of test information.

  10. The NUITM-KEMRI P3 Laboratory in Kenya: Establishment, Features, Operation and Maintenance

    PubMed Central

    Inoue, Shingo; Wandera, Ernest; Miringu, Gabriel; Bundi, Martin; Narita, Chika; Ashur, Salame; Kwallah, Allan; Galata, Amina; Abubakar, Mwajuma; Suka, Sora; Mohamed, Shah; Karama, Mohamed; Horio, Masahiro; Shimada, Masaaki; Ichinose, Yoshio

    2013-01-01

    A biocontainment facility is a core component in any research setting due to the services it renders towards comprehensive biosafety observance. The NUITM-KEMRI P3 facility was set up in 2007 and has been actively in use since 2010 by researchers from this and other institutions. A number of hazardous agents have been handled in the laboratory among them MDR-TB and yellow fever viruses. The laboratory has the general physical and operational features of a P3 laboratory in addition to a number of unique features, among them the water-air filtration system, the eco-mode operation feature and automation of the pressure system that make the facility more efficient. It is equipped with biosafety and emergency response equipments alongside common laboratory equipments, maintained regularly using daily, monthly and yearly routines. Security and safety is strictly observed within the facility, enhanced by restricted entry, strict documentation and use of safety symbols. Training is also engrained within the operation of the laboratory and is undertaken and evaluated annually. Though the laboratory is in the process of obtaining accreditation, it is fully certified courtesy of the manufactures’ and constructed within specified standards. PMID:23533023

  11. Hopkins works with the MDCA hardware replacement, and CIR maintenance

    NASA Image and Video Library

    2013-12-31

    ISS038-E-024145 (30 Dec. 2013) --- NASA astronaut Mike Hopkins, Expedition 38 flight engineer, performs in-flight maintenance on combustion research hardware in the Destiny laboratory of the International Space Station. Hopkins replaced a Multi-user Droplet Combustion Apparatus (MDCA) fuel reservoir inside the Combustion Integrated Rack (CIR).

  12. Rural neurosurgical and spinal laboratory setup.

    PubMed

    Smith, Adam; Gagliardi, Filippo; Pelzer, Nicholas Robert; Hampton, Jacob; Chau, Anthony Minh Tien; Stewart, Fiona; Mortini, Pietro; Gragnaniello, Cristian

    2015-12-01

    Increasing focus has been placed on the use of simulation in neurosurgical and spinal surgical training worldwide, with the establishment of many surgical laboratories dedicated to such purpose. So far, the opportunities for hands-on cadaveric training in the areas of neurosurgery and spine surgery remain limited in Australia, owing to various factors, including the abolition of dissection in many medical schools, high maintenance requirements and widespread geographical distribution of surgical trainees. We established a cadaver-based neurosurgical laboratory based at the medical school of the University of New England in Armidale, Australia, which is used by the surgical dissection course for junior surgical trainees offered by the university. We reported our experiences in setting up a neurosurgical research laboratory, and explored the feasibility of establishing a cost-effective anatomical research facility in a rural setting in Australia. We found that Genelyn(TM)-fixed cadavers had limited movements of the head as required for adequate surgical positioning and exposure. Furthermore, we discovered that bodies embalmed via the femoral vein had poorly perfused heads after surgical exposure, and thus decapitation had to be performed unfortunately for our purpose. Cadaver samples and surgical equipment were sourced from various veterinary practices and commercial companies. Using human and animal cadavers, this laboratory provided trainees with hands-on opportunities to improve their surgical skills and neuroanatomical knowledge, as well as develop familiarity with highly specialized surgical equipment. We demonstrated the feasibility of establishing a cost-effective neurosurgical research laboratory in Australia and discussed various aspects of its maintenance.

  13. Data sharing report characterization of population 7: Personal protective equipment, dry active waste, and miscellaneous debris, surveillance and maintenance project Oak Ridge National Laboratory Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harpenau, Evan M.

    2013-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan formore » Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.« less

  14. Albuquerque Seismological Laboratory--50 years of global seismology

    USGS Publications Warehouse

    Hutt, C.R.; Peterson, Jon; Gee, Lind; Derr, John; Ringler, Adam; Wilson, David

    2011-01-01

    The U.S. Geological Survey Albuquerque Seismological Laboratory is about 15 miles southeast of Albuquerque on the Pueblo of Isleta, adjacent to Kirtland Air Force Base. The Albuquerque Seismological Laboratory supports the Global Seismographic Network Program and the Advanced National Seismic System through the installation, operation, and maintenance of seismic stations around the world and serves as the premier seismological instrumentation test facility for the U.S. Government.

  15. Time maintenance system for the BMDO MSX spacecraft

    NASA Technical Reports Server (NTRS)

    Hermes, Martin J.

    1994-01-01

    The Johns Hopkins University Applied Physics Laboratory (APL) is responsible for designing and implementing a clock maintenance system for the Ballistic Missile Defense Organizations (BMDO) Midcourse Space Experiment (MSX) spacecraft. The MSX spacecraft has an on-board clock that will be used to control execution of time-dependent commands and to time tag all science and housekeeping data received from the spacecraft. MSX mission objectives have dictated that this spacecraft time, UTC(MSX), maintain a required accuracy with respect to UTC(USNO) of +/- 10 ms with a +/- 1 ms desired accuracy. APL's atomic time standards and the downlinked spacecraft time were used to develop a time maintenance system that will estimate the current MSX clock time offset during an APL pass and make estimates of the clock's drift and aging using the offset estimates from many passes. Using this information, the clock's accuracy will be maintained by uplinking periodic clock correction commands. The resulting time maintenance system is a combination of offset measurement, command/telemetry, and mission planning hardware and computing assets. All assets provide necessary inputs for deciding when corrections to the MSX spacecraft clock must be made to maintain its required accuracy without inhibiting other mission objectives. The MSX time maintenance system is described as a whole and the clock offset measurement subsystem, a unique combination of precision time maintenance and measurement hardware controlled by a Macintosh computer, is detailed. Simulations show that the system estimates the MSX clock offset to less than+/- 33 microseconds.

  16. Cryogenics maintenance strategy

    NASA Astrophysics Data System (ADS)

    Cruzat, Fabiola

    2012-09-01

    ALMA is an interferometer composed of 66 independent systems, with specific maintenance requirements for each subsystem. To optimize the observation time and reduce downtime maintenance, requirements are very demanding. One subsystem with high maintenance efforts is cryogenics and vacuum. To organize the maintenance, the Cryogenic and Vacuum department is using and implementing different tools. These are monitoring and problem reporting systems and CMMS. This leads to different maintenance approaches: Preventive Maintenance, Corrective Maintenance and Condition Based Maintenance. In order to coordinate activities with other departments the preventive maintenance schedule is kept as flexible as systems allow. To cope with unavoidable failures, the team has to be prepared to work under any condition with the spares on time. Computerized maintenance management system (CMMS) will help to manage inventory control for reliable spare part handling, the correct record of work orders and traceability of maintenance activities. For an optimized approach the department is currently evaluating where preventive or condition based maintenance applies to comply with the individual system demand. Considering the change from maintenance contracts to in-house maintenance will help to minimize costs and increase availability of parts. Due to increased number of system and tasks the cryo team needs to grow. Training of all staff members is mandatory, in depth knowledge must be built up by doing complex maintenance activities in the Cryo group, use of advanced computerized metrology systems.

  17. Open-RAC: Open-Design, Recirculating and Auto-Cleaning Zebrafish Maintenance System.

    PubMed

    Nema, Shubham; Bhargava, Yogesh

    2017-08-01

    Zebrafish is a vertebrate animal model. Their maintenance in large number under laboratory conditions is a daunting task. Commercially available recirculating zebrafish maintenance systems are used to efficiently handle the tasks of automatic sediment cleaning from zebrafish tanks with minimal waste of water. Due to their compact nature, they also ensure the maximal use of available lab space. However, the high costs of commercial systems present a limitation to researchers with limited funds. A cost-effective zebrafish maintenance system with major features offered by commercially available systems is highly desirable. Here, we describe a compact and recirculating zebrafish maintenance system. Our system is composed of cost-effective components, which are available in local markets and/or can be procured via online vendors. Depending on the expertise of end users, the system can be assembled in 2 days. The system is completely customizable as it offers geometry independent zebrafish tanks that are capable of auto-cleaning the sediments. Due to these features, we called our setup as Open-RAC (Open-design, Recirculating and Auto-Cleaning zebrafish maintenance system). Open-RAC is a cost-effective and viable alternative to the currently available zebrafish maintenance systems. Thus, we believe that the use of Open-RAC could promote the zebrafish research by removing the cost barrier for researchers.

  18. Data sharing report characterization of the surveillance and maintenance project miscellaneous process inventory waste items Oak Ridge National Laboratory, Oak Ridge, TN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weaver, Phyllis C.

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in themore » Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)—using the approved Waste Lot (WL) 108.1 profile—the Y-12 Sanitary Landfill (SLF) if appropriate; Energy

  19. You Too Can Have a Language Laboratory! (Also: Advice on How to Make Language Tapes).

    ERIC Educational Resources Information Center

    Frey, J. William

    Advice on how to obtain a language laboratory is accompanied by observations on how to make language tapes. Flexibility in planning the laboratory, a thorough demonstration of the new laboratory, demonstrations on making tapes, a maintenance program, and the need for periodic servicing of the laboratory are considered vital. The primary function;…

  20. 119. ARAI Shop and maintenance (ARA627) building sections and details ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    119. ARA-I Shop and maintenance (ARA-627) building sections and details of interior mesh partitions. Norman Engineering Company 961-area/SF-627-A-3. Date: January 1959. Ineel index code no. 068-0627-00-613-102761. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  1. EAST ELEVATION OF MAIN PROCESSING BUILDING (CPP601) LOOKING NORTHWEST. MAINTENANCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    EAST ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTHWEST. MAINTENANCE SHOP AND OFFICE BUILDING (CPP-630) ON RIGHT IN PHOTO. INL PHOTO NUMBER HD-22-3-2. Mike Crane, Photographer, 11/1998 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  2. Knowledge-based approaches to the maintenance of a large controlled medical terminology.

    PubMed Central

    Cimino, J J; Clayton, P D; Hripcsak, G; Johnson, S B

    1994-01-01

    OBJECTIVE: Develop a knowledge-based representation for a controlled terminology of clinical information to facilitate creation, maintenance, and use of the terminology. DESIGN: The Medical Entities Dictionary (MED) is a semantic network, based on the Unified Medical Language System (UMLS), with a directed acyclic graph to represent multiple hierarchies. Terms from four hospital systems (laboratory, electrocardiography, medical records coding, and pharmacy) were added as nodes in the network. Additional knowledge about terms, added as semantic links, was used to assist in integration, harmonization, and automated classification of disparate terminologies. RESULTS: The MED contains 32,767 terms and is in active clinical use. Automated classification was successfully applied to terms for laboratory specimens, laboratory tests, and medications. One benefit of the approach has been the automated inclusion of medications into multiple pharmacologic and allergenic classes that were not present in the pharmacy system. Another benefit has been the reduction of maintenance efforts by 90%. CONCLUSION: The MED is a hybrid of terminology and knowledge. It provides domain coverage, synonymy, consistency of views, explicit relationships, and multiple classification while preventing redundancy, ambiguity (homonymy) and misclassification. PMID:7719786

  3. eComLab: remote laboratory platform

    NASA Astrophysics Data System (ADS)

    Pontual, Murillo; Melkonyan, Arsen; Gampe, Andreas; Huang, Grant; Akopian, David

    2011-06-01

    Hands-on experiments with electronic devices have been recognized as an important element in the field of engineering to help students get familiar with theoretical concepts and practical tasks. The continuing increase the student number, costly laboratory equipment, and laboratory maintenance slow down the physical lab efficiency. As information technology continues to evolve, the Internet has become a common media in modern education. Internetbased remote laboratory can solve a lot of restrictions, providing hands-on training as they can be flexible in time and the same equipment can be shared between different students. This article describes an on-going remote hands-on experimental radio modulation, network and mobile applications lab project "eComLab". Its main component is a remote laboratory infrastructure and server management system featuring various online media familiar with modern students, such as chat rooms and video streaming.

  4. Maintenance Research. Report 6. Maintenance Training.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Highways, Baton Rouge.

    The main objective of the training research phase of the maintenance management study was to develop and test training methods suitable for highway maintenance supervisors. Supervisors were trained by one of five different methods (lecture, group discussion, programed instruction, programed workshops, audiovisual instruction). The report documents…

  5. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and

  6. Pollution prevention opportunity assessment for Facilities Maintenance Team (FMT) paint shop.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klossner, Kristin Ann

    This Pollution Prevention Opportunity Assessment (PPOA) was conducted for Sandia National Laboratories/California Facilities Maintenance Team Paint Shop Operations in August and September 2002. The primary purpose of this PPOA is to provide recommendations to assist Paint Shop personnel in reducing the generation of waste and improving the efficiency of their processes. This report contains a summary of the information collected and analyses performed and recommends options for implementation. The Sandia National Laboratories Pollution Prevention staff will continue to work with the Paint Shop to implement the recommendations.

  7. 117. ARAI Shop and maintenance (ARA627) building roof and floor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    117. ARA-I Shop and maintenance (ARA-627) building roof and floor plan. Includes room finish and equipment schedule. Norman Engineering Company 961-area/SF-627-A-1. Date: January 1959. Ineel index code no. 068-0627-00-613-102759. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  8. Operation, Maintenance and Management of Wastewater Treatment Facilities: A Bibliography of Technical Documents.

    ERIC Educational Resources Information Center

    Himes, Dottie

    This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…

  9. A Unique Testing System for Audio Visual Foreign Language Laboratory.

    ERIC Educational Resources Information Center

    Stama, Spelios T.

    1980-01-01

    Described is the design of a low maintenance, foreign language laboratory at Ithaca College, New York, that provides visual and audio instruction, flexibility for testing, and greater student involvement in the lessons. (Author/CS)

  10. DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watkins, R.; England, J.

    2010-05-28

    Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attendedmore » by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.« less

  11. Buying Into Maintenance.

    ERIC Educational Resources Information Center

    May, Abigail

    1998-01-01

    Describes how educational institutions are recognizing the short-sightedness of deferred maintenance. Discusses the challenges facing schools as they confront maintenance costs and what they must do to address the problem. Offers advice on proactive stances toward maintenance such as computerized work control processes, maintenance zones, and…

  12. Laboratory challenges in the scaling up of HIV, TB, and malaria programs: The interaction of health and laboratory systems, clinical research, and service delivery.

    PubMed

    Birx, Deborah; de Souza, Mark; Nkengasong, John N

    2009-06-01

    Strengthening national health laboratory systems in resource-poor countries is critical to meeting the United Nations Millennium Development Goals. Despite strong commitment from the international community to fight major infectious diseases, weak laboratory infrastructure remains a huge rate-limiting step. Some major challenges facing laboratory systems in resource-poor settings include dilapidated infrastructure; lack of human capacity, laboratory policies, and strategic plans; and limited synergies between clinical and research laboratories. Together, these factors compromise the quality of test results and impact patient management. With increased funding, the target of laboratory strengthening efforts in resource-poor countries should be the integrating of laboratory services across major diseases to leverage resources with respect to physical infrastructure; types of assays; supply chain management of reagents and equipment; and maintenance of equipment.

  13. 14 CFR 91.1425 - CAMP: Maintenance, preventive maintenance, and alteration programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... RULES Fractional Ownership Operations Program Management § 91.1425 CAMP: Maintenance, preventive maintenance, and alteration programs. Each program manager who maintains program aircraft under a CAMP must... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false CAMP: Maintenance, preventive maintenance...

  14. Depot Maintenance: Executed Workload and Maintenance Operations at DOD Depots

    DTIC Science & Technology

    2017-02-03

    Page 1 GAO-17-82R Depot Maintenance 441 G St. N.W. Washington, DC 20548 February 3, 2017 The Honorable John McCain Chairman The...Smith Ranking Member Committee on Armed Services House of Representatives Depot Maintenance : Executed Workload and Maintenance Operations at DOD...Depots The Department of Defense (DOD) uses its maintenance capabilities to maintain, overhaul, and repair its military weapon systems (such as

  15. Proper laboratory notebook practices: protecting your intellectual property.

    PubMed

    Nickla, Jason T; Boehm, Matthew B

    2011-03-01

    A laboratory notebook contains a wealth of knowledge that can be critical for establishing evidence in support of intellectual property rights and for refuting claims of research misconduct. The proper type, organization, use, maintenance, and storage of laboratory notebooks should be a priority for everyone at research institutions. Failure to properly document research activities can lead to serious problems, including the loss of valuable patent rights. Consequences of improper laboratory notebook practices can be harsh; numerous examples are described in court cases and journal articles, indicating a need for research institutions to develop strict policies on the proper use and storage of research documentation.

  16. 118. ARAI Shop and maintenance (ARA627) building elevations of north, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    118. ARA-I Shop and maintenance (ARA-627) building elevations of north, south, east, and west sides and other details of door and window types. Norman Engineering Company 961-area/SF-627-A-2. Date: January 1959. Ineel index code no. 068-0627-00-613-102760. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  17. Towards New Multiplatform Hybrid Online Laboratory Models

    ERIC Educational Resources Information Center

    Rodriguez-Gil, Luis; García-Zubia, Javier; Orduña, Pablo; López-de-Ipiña, Diego

    2017-01-01

    Online laboratories have traditionally been split between virtual labs, with simulated components; and remote labs, with real components. The former tend to provide less realism but to be easily scalable and less expensive to maintain, while the latter are fully real but tend to require a higher maintenance effort and be more error-prone. This…

  18. The Tanzania experience: clinical laboratory testing harmonization and equipment standardization at different levels of a tiered health laboratory system.

    PubMed

    Massambu, Charles; Mwangi, Christina

    2009-06-01

    The rapid scale-up of the care and treatment programs in Tanzania during the preceding 4 years has greatly increased the demand for quality laboratory services for diagnosis of HIV and monitoring patients during antiretroviral therapy. Laboratory services were not in a position to cope with this demand owing to poor infrastructure, lack of human resources, erratic and/or lack of reagent supply and commodities, and slow manual technologies. With the limited human resources in the laboratory and the need for scaling up the care and treatment program, it became necessary to install automated equipment and train personnel for the increased volume of testing and new tests across all laboratory levels. With the numerous partners procuring equipment, the possibility of a multitude of equipment platforms with attendant challenges for procurement of reagents, maintenance of equipment, and quality assurance arose. Tanzania, therefore, had to harmonize laboratory tests and standardize laboratory equipment at different levels of the laboratory network. The process of harmonization of tests and standardization of equipment included assessment of laboratories, review of guidelines, development of a national laboratory operational plan, and stakeholder advocacy. This document outlines this process.

  19. 47 CFR 80.1074 - Radio maintenance personnel for at-sea maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Radio maintenance personnel for at-sea... System (GMDSS) General Provisions § 80.1074 Radio maintenance personnel for at-sea maintenance. (a) Ships that elect the at-sea option for maintenance of GMDSS equipment (see § 80.1105) must carry at least one...

  20. 47 CFR 80.1074 - Radio maintenance personnel for at-sea maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Radio maintenance personnel for at-sea... System (GMDSS) General Provisions § 80.1074 Radio maintenance personnel for at-sea maintenance. (a) Ships that elect the at-sea option for maintenance of GMDSS equipment (see § 80.1105) must carry at least one...

  1. 47 CFR 80.1074 - Radio maintenance personnel for at-sea maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Radio maintenance personnel for at-sea... System (GMDSS) General Provisions § 80.1074 Radio maintenance personnel for at-sea maintenance. (a) Ships that elect the at-sea option for maintenance of GMDSS equipment (see § 80.1105) must carry at least one...

  2. 47 CFR 80.1074 - Radio maintenance personnel for at-sea maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Radio maintenance personnel for at-sea... System (GMDSS) General Provisions § 80.1074 Radio maintenance personnel for at-sea maintenance. (a) Ships that elect the at-sea option for maintenance of GMDSS equipment (see § 80.1105) must carry at least one...

  3. 47 CFR 80.1074 - Radio maintenance personnel for at-sea maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Radio maintenance personnel for at-sea... System (GMDSS) General Provisions § 80.1074 Radio maintenance personnel for at-sea maintenance. (a) Ships that elect the at-sea option for maintenance of GMDSS equipment (see § 80.1105) must carry at least one...

  4. Risk factors of periodontal disease in maintenance hemodialysis patients

    PubMed Central

    Hou, Yue; Wang, Xin; Zhang, Cong-Xiao; Wei, Yu-Dan; Jiang, Li-Li; Zhu, Xiao-Yu; Du, Yu-Jun

    2017-01-01

    Abstract To explore the characteristics and relevant risk factors of periodontal disease (PD) among hemodialysis patients. Uremic patients on maintenance hemodialysis from November 2015 to March 2016 were retrospectively reviewed. Patients were divided into a PD group and a non-PD group. Demographic and laboratory data were collected and analyzed. In all, 136 uremic patients (79 males and 57 females, aged 50.8 ± 15.3 years) on maintenance hemodialysis were included in this study. The incidence of PD increased with age. Hemodialysis patients most likely developed PD if they were male, smokers, or diabetic (P = .009, <.001, and <.001, respectively). Patients brushing their teeth twice daily had significantly less chance of developing PD as compared with those only brushing once daily (P < .001). Hemodialysis patients in the PD group had significantly higher levels of total cholesterol, high-sensitivity C-reactive protein, fasting blood glucose, and peripheral white blood cell counts, compared with the non-PD group (all P < .001). Logistic regression analysis revealed that diabetes, total cholesterol, high-sensitivity C-reactive protein, and peripheral white blood cell count were independent risk factors for developing PD, whereas teeth brushing twice daily and serum calcium were favorable factors for maintenance hemodialysis patients against PD. Identification of risk factors provides a theoretical basis for prevention and improvement of PD among maintenance hemodialysis patients. PMID:28858105

  5. National Laboratory Planning: Developing Sustainable Biocontainment Laboratories in Limited Resource Areas.

    PubMed

    Yeh, Kenneth B; Adams, Martin; Stamper, Paul D; Dasgupta, Debanjana; Hewson, Roger; Buck, Charles D; Richards, Allen L; Hay, John

    2016-01-01

    Strategic laboratory planning in limited resource areas is essential for addressing global health security issues. Establishing a national reference laboratory, especially one with BSL-3 or -4 biocontainment facilities, requires a heavy investment of resources, a multisectoral approach, and commitments from multiple stakeholders. We make the case for donor organizations and recipient partners to develop a comprehensive laboratory operations roadmap that addresses factors such as mission and roles, engaging national and political support, securing financial support, defining stakeholder involvement, fostering partnerships, and building trust. Successful development occurred with projects in African countries and in Azerbaijan, where strong leadership and a clear management framework have been key to success. A clearly identified and agreed management framework facilitate identifying the responsibility for developing laboratory capabilities and support services, including biosafety and biosecurity, quality assurance, equipment maintenance, supply chain establishment, staff certification and training, retention of human resources, and sustainable operating revenue. These capabilities and support services pose rate-limiting yet necessary challenges. Laboratory capabilities depend on mission and role, as determined by all stakeholders, and demonstrate the need for relevant metrics to monitor the success of the laboratory, including support for internal and external audits. Our analysis concludes that alternative frameworks for success exist for developing and implementing capabilities at regional and national levels in limited resource areas. Thus, achieving a balance for standardizing practices between local procedures and accepted international standards is a prerequisite for integrating new facilities into a country's existing public health infrastructure and into the overall international scientific community.

  6. National Laboratory Planning: Developing Sustainable Biocontainment Laboratories in Limited Resource Areas

    PubMed Central

    Adams, Martin; Stamper, Paul D.; Dasgupta, Debanjana; Hewson, Roger; Buck, Charles D.; Richards, Allen L.; Hay, John

    2016-01-01

    Strategic laboratory planning in limited resource areas is essential for addressing global health security issues. Establishing a national reference laboratory, especially one with BSL-3 or -4 biocontainment facilities, requires a heavy investment of resources, a multisectoral approach, and commitments from multiple stakeholders. We make the case for donor organizations and recipient partners to develop a comprehensive laboratory operations roadmap that addresses factors such as mission and roles, engaging national and political support, securing financial support, defining stakeholder involvement, fostering partnerships, and building trust. Successful development occurred with projects in African countries and in Azerbaijan, where strong leadership and a clear management framework have been key to success. A clearly identified and agreed management framework facilitate identifying the responsibility for developing laboratory capabilities and support services, including biosafety and biosecurity, quality assurance, equipment maintenance, supply chain establishment, staff certification and training, retention of human resources, and sustainable operating revenue. These capabilities and support services pose rate-limiting yet necessary challenges. Laboratory capabilities depend on mission and role, as determined by all stakeholders, and demonstrate the need for relevant metrics to monitor the success of the laboratory, including support for internal and external audits. Our analysis concludes that alternative frameworks for success exist for developing and implementing capabilities at regional and national levels in limited resource areas. Thus, achieving a balance for standardizing practices between local procedures and accepted international standards is a prerequisite for integrating new facilities into a country's existing public health infrastructure and into the overall international scientific community. PMID:27559843

  7. Maintenance Management Update.

    ERIC Educational Resources Information Center

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  8. Appliques for the maintenance of lead-based painted bridges : a laboratory assessment of field-performance characteristics.

    DOT National Transportation Integrated Search

    2004-01-01

    Approximately 3,500 bridges in Virginia having steel superstructures are coated with lead-based paints. Many of these bridges are in need of paint maintenance. This research evaluated applique technology, an alternative to the conventional paradigm...

  9. MTRETR MAINTENANCE SHOP, TRA653. FLOOR PLAN FOR MEZZANINE: LUNCH AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MTR-ETR MAINTENANCE SHOP, TRA-653. FLOOR PLAN FOR MEZZANINE: LUNCH AND CONFERENCE ROOM, STORAGE AREA, OFFICES FOR FOREMEN, STENOS, ENGINEERS, DISPATCHER, WOMEN'S RESTROOM. HUMMEL HUMMEL & JONES 810-MTR-ETR-653-A-12, 2/1958. INL INDEX NO. 532-0653-00-381-102837, REV. 3. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  10. Operating environmental laboratories--an overview of analysis equipment procurement and management.

    PubMed

    Pandya, G H; Shinde, V M; Kanade, G S; Kondawar, V K

    2003-10-01

    Management of equipment in an environmental laboratory requires planning involving assessment of the workload on a particular equipment, establishment of criteria and specification for the purchase of equipment, creation of infrastructure for installation and testing of the equipment, optimization of analysis conditions, development of preventive maintenance procedures and establishment of in-house repair facilities. The paper reports the results of such an analysis carried for operating environmental laboratories associated with R& D work, serving as an Govt. laboratory or attached to an Industry for analysing industrial emissions.

  11. Examining maintenance responsibilities.

    PubMed

    Lam, K C

    2001-06-01

    This paper has examined the important responsibilities of the two organisations involved in the provision of maintenance service for the vital building services in many of our highly serviced buildings. The issues raised could be put to beneficial use in both clients and maintenance providers. All in all, the clients should work closely with their maintenance providers. Engineering services in buildings will not perform satisfactorily and efficiently if both parties do not work together and understand the maintenance tasks based on a business partnering mode. Put forward is the view that the management of the activities involved in the operation and maintenance process is a "shared commitment/involvement" between the client and the maintenance provider. It is obvious that many factors can influence the continued effectiveness of a quality maintenance scheme set up by client and provider. Some of these factors are: Change in key personnel Updates in technology Amendments to engineering practice Implementation of legislative requirements Changes in operation by client or provider Change of use of building Passage of time These factors must be fully reviewed by both parties from time to time, and necessary actions taken. A cooperative team working relationship and improved communication should be fostered by the client and his provider for the best management of services maintenance. This arrangement will contribute to better building services systems with continuous improvement; improved value for clients and higher return for the maintenance provider.

  12. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Operation after maintenance, preventive...

  13. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Operation after maintenance, preventive...

  14. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Operation after maintenance, preventive...

  15. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Operation after maintenance, preventive...

  16. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Operation after maintenance, preventive...

  17. Maintenance Business Plans.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  18. Careers in Construction, Building Maintenance and Allied Occupations. Junior High School. Course Outline.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL. Office of Vocational and Adult Education.

    The guide was prepared to assist student emploration in the fields of construction and building maintenance and as preparation for further specialized training. The course was prepared for quinmester use and includes a series of manipulative job assignments within a laboratory equipped to simulate the actual job atmosphere found in the…

  19. Valve leakage inspection, testing, and maintenance process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aikin, J.A.; Reinwald, J.W.

    1989-01-01

    Atomic Energy of Canada Limited-Research Company (AECL-RC), Chalk River, has more than 50 person-years dedicated toward the leak-free valve. In the early 1970s, the Chalk River Nuclear Laboratories (CRNL) developed valve stem live-loading and recently completed the packing tests for the Electric Power Research Institute (EPRI)-funded Valve Packing Improvement Study. Current safety concerns with asbestos-based valve packings and the difficulty in removing newer graphite packings prompted CRNL to investigate methods to improve valve repacking procedures. The present practice of valve packing replacement is very labor-intensive, requiring use of hand tools such as corkscrew devices and special packing picks. Use ofmore » water jets to cut or fragment the packing for withdrawal from the stuffing box does improve the process, but removal of the lantern or junk rings is still difficult. To address these problems, AECL-RC has developed a unique valve maintenance process designed to reduce person-rem exposures, the risk of scoring the stem or stuffing box, and maintenance costs and to improve the engineering quality of valve repair.« less

  20. Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility - Fiscal Year 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Birdsell, Kay Hanson; Stauffer, Philip H.; Atchley, Adam Lee

    As a condition to the disposal authorization statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis (PA/CA) maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the PA/CA are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year (FY) 2016 annual review for Area G.

  1. Microform Reader Maintenance.

    ERIC Educational Resources Information Center

    Hall, Hal W.; Michaels, George H.

    1985-01-01

    Describes experiences in organizing a program of microform reader and reader/printer maintenance at Texas A & M's Sterling C. Evans Library and offers guidelines for regular machine maintenance and repair. Guidelines discussed relate to maintenance philosophy, general machine cleaning, troubleshooting, service contracts, supplies,…

  2. Quality indicators and specifications for strategic and support processes in laboratory medicine.

    PubMed

    Ricós, Carmen; Biosca, Carme; Ibarz, Mercè; Minchinela, Joana; Llopis, Maantonia; Perich, Carmen; Alsina, Jesus; Alvarez, Virtudes; Doménech, Vicenta; Pastor, Rosa Ma; Sansalvador, Mireia; Isern, Gloria Trujillo; Navarro, Conrad Vilanova

    2008-01-01

    This work is the second part of a study regarding indicators and quality specifications for the non-analytical processes in laboratory medicine. Five primary care and five hospital laboratories agreed on the indicators for two strategic processes (quality planning and project development) and various support processes (client relationships, instrument and infrastructure maintenance, safety and risk prevention, purchases and storage, personnel training). In the majority of cases, the median values recorded over 1 year is considered to be the state-of-the-art in our setting and proposed as the quality specification for the indicators stated. Values have been stratified according to primary care and hospital laboratory for referred tests and group of personnel for training. In some cases, the specifications have been set equal to zero events, such as serious incidents in the infrastructure maintenance process and number of work accidents in the safety and risk prevention process. In light of this study, an effort is needed to optimize decisions regarding corrective actions and to move from a subjective individual criterion to systematic and comparative management. This preliminary study provides a comprehensive vision of a subject that could motivate further research and advances in the quality of laboratory services.

  3. Color Maintenance of LEDs in Laboratory and Field Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Royer, Michael P.; Tuttle, Ralph; Rosenfeld, Scott M.

    Synopsis: To date, consideration for parametric failure of LED products has largely been focused on lumen maintenance. However, color shift is a cause of early failure for some products, and is especially important to consider in certain applications, like museums, where visual appearance is critical. Example data collected by the GATEWAY program for LED lamps installed in museums shows that many have changed color beyond a reasonable tolerance well before their rated lifetime was reached, necessitating replacement. Similar data collected by the CALiPER program between 2008 and 2010 reveals that many early products shifted beyond acceptable tolerances in as littlemore » as a few thousand hours. In contrast, data from the L Prize program illustrates that commercially available LED products can have exemplary color stability that is unmatched by traditional light sources. Beyond presenting data from the aforementioned DOE programs, this report discusses the metrics used for communicating color shift—namely MacAdam ellipses and Δu'v'—as well as providing guidance for end users on how to monitor color shift and what to look for in manufacturer warranties. Also included are descriptions of the physical changes that have been documented as leading to color shift in some example types of LED packages. As with complete products, the data presented herein for LED packages shows that a wide variety of products are available; in order for specifiers and consumers to make educated choices, more detailed and standardized information should be made available.« less

  4. Naltrexone Maintenance Decreases Cannabis Self-Administration and Subjective Effects in Daily Cannabis Smokers.

    PubMed

    Haney, Margaret; Ramesh, Divya; Glass, Andrew; Pavlicova, Martina; Bedi, Gillinder; Cooper, Ziva D

    2015-10-01

    Given that cannabis use is increasing in the United States, pharmacological treatment options to treat cannabis use disorder are needed. Opioid antagonists modulate cannabinoid effects and may offer a potential approach to reducing cannabis use. In this double-blind, placebo-controlled human laboratory study, we assessed the effects of naltrexone maintenance on the reinforcing, subjective, psychomotor, and cardiovascular effects of active and inactive cannabis. Nontreatment-seeking, daily cannabis smokers were randomized to receive naltrexone (50 mg: n=18 M and 5 F) or placebo (0 mg; n=26 M and 2 F) capsules for 16 days. Before, during, and after medication maintenance, participants completed 10 laboratory sessions over 4-6 weeks, assessing cannabis' behavioral and cardiovascular effects. Medication compliance was verified by observed capsule administration, plasma naltrexone, and urinary riboflavin. Relative to placebo, maintenance on naltrexone significantly reduced both active cannabis self-administration and its positive subjective effects ('good effect'). Participants in the placebo group had 7.6 times (95% CI: 1.1-51.8) the odds of self-administering active cannabis compared with the naltrexone group. This attenuation of reinforcing and positive subjective effects also influenced cannabis use in the natural ecology. Naltrexone had intrinsic effects: decreasing ratings of friendliness, food intake, and systolic blood pressure, and increasing spontaneous reports of stomach upset and headache, yet dropout rates were comparable between groups. In summary, we show for the first time that maintenance on naltrexone decreased cannabis self-administration and ratings of 'good effect' in nontreatment-seeking daily cannabis smokers. Clinical studies in patients motivated to reduce their cannabis use are warranted to evaluate naltrexone's efficacy as a treatment for cannabis use disorder.

  5. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    PubMed

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  6. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    PubMed Central

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices. PMID:27195666

  7. Support and Maintenance of the International Monitoring System network

    NASA Astrophysics Data System (ADS)

    Pereira, Jose; Bazarragchaa, Sergelen; Kilgour, Owen; Pretorius, Jacques; Werzi, Robert; Beziat, Guillaume; Hamani, Wacel; Mohammad, Walid; Brely, Natalie

    2014-05-01

    The Monitoring Facilities Support Section of the Provisional Technical Secretariat (PTS) has as its main task to ensure optimal support and maintenance of an array of 321 monitoring stations and 16 radionuclide laboratories distributed worldwide. Raw seismic, infrasonic, hydroacoustic and radionuclide data from these facilities constitutes the basic product delivered by the International Monitoring System (IMS). In the process of maintaining such a wide array of stations of different technologies, the Support Section contributes to ensuring station mission capability. Mission capable data availability according to the IMS requirements should be at least 98% annually (no more than 7 days down time per year per waveform stations - 14 continuous for radionuclide stations) for continuous data sending stations. In this presentation, we will present our case regarding our intervention at stations to address equipment supportability and maintainability, as these are particularly large activities requiring the removal of a substantial part of the station equipment and installation of new equipment. The objective is always to plan these activities while minimizing downtime and continuing to meet all IMS requirements, including those of data availability mentioned above. We postulate that these objectives are better achieved by planning and making use of preventive maintenance, as opposed to "run-to-failure" with associated corrective maintenance. We use two recently upgraded Infrasound Stations (IS39 Palau and IS52 BIOT) as a case study and establish a comparison between these results and several other stations where corrective maintenance was performed, to demonstrate our hypothesis.

  8. Roadside maintenance

    DOT National Transportation Integrated Search

    2010-01-01

    Roadside Maintenance is a unique element within the highway maintenance program because much of the work involves caring for and/or controlling vegetation. Roadside vegetation, if managed properly, can become more naturally self-sustaining over time ...

  9. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    ERIC Educational Resources Information Center

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  10. Managing Highway Maintenance: Maintenance Management--by Objectives, Unit 10, Level 2.

    ERIC Educational Resources Information Center

    Federal Highway Administration (DOT), Washington, DC. Offices of Research and Development.

    Part of the series "Managing Highway Maintenance," the unit deals with management by objectives--its definition, how it works, and necessary steps for application. It is designed for maintenance supervisors who are familiar with maintenance management systems. The format is a programed, self-instructional approach in which questions are…

  11. Managing Highway Maintenance: Instructor's Guide: For Training in Managing Highway Maintenance.

    ERIC Educational Resources Information Center

    Federal Highway Administration (DOT), Washington, DC. Offices of Research and Development.

    The guide, intended for use by training officers and field instructors in highway maintenance management, contains five courses with a combined total of 17 units of instruction for maintenance engineers and supervisors. The curriculum incorporates management concepts and practices of State, county, and city maintenance agencies which have…

  12. Maintenance Downtime

    Atmospheric Science Data Center

    2013-07-10

    ... will be unavailable March 5, 2013 8:00 am to 5:00 pm due to database maintenance. Date(s):  Tuesday, March 5, 2013 ... will be unavailable March 5, 2013 8:00 am to 5:00 pm due to database maintenance. ...

  13. Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility – Fiscal Year 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    French, Sean B.; Stauffer, Philip H.; Birdsell, Kay H.

    As a condition to the disposal authorization statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the performance assessment and composite analysis (PA/CA) are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year (FY) 2015 annual review for Area G.

  14. Coping with Deferred Maintenance.

    ERIC Educational Resources Information Center

    Suber, L. Terry

    1982-01-01

    The deferred maintenance problem on college and university campuses is addressed. Deferred maintenance refers to larger or more expansive maintenance work that can be delayed and is not performed when needed or reported, usually because its cost is beyond the annual maintenance and operating budget of the physical plant department. Eventually…

  15. Grounds Maintenance Cost Report.

    ERIC Educational Resources Information Center

    Joice, Donald K.

    A grounds maintenance study was accomplished over the period of March 1965 through February 1966 to--(1) determine current grounds maintenance cost distribution; (2) provide basis for future grounds maintenance budgeting, and (3) provide basic data by which future landscape project designs can be developed to project or reduce maintenance costs.…

  16. Innovation for maintenance technology improvements

    NASA Technical Reports Server (NTRS)

    Shives, T. R. (Editor); Willard, W. A. (Editor)

    1982-01-01

    A group of 34 submitted entries (32 papers and 2 abstracts) from the 33rd meeting of the Mechanical Failures Prevention Group whose subject was maintenance technology improvement through innovation. Areas of special emphasis included maintenance concepts, maintenance analysis systems, improved maintenance processes, innovative maintenance diagnostics and maintenance indicators, and technology improvements for power plant applications.

  17. Virtual Laboratories to Achieve Higher-Order Learning in Fluid Mechanics

    NASA Astrophysics Data System (ADS)

    Ward, A. S.; Gooseff, M. N.; Toto, R.

    2009-12-01

    Bloom’s higher-order cognitive skills (analysis, evaluation, and synthesis) are recognized as necessary in engineering education, yet these are difficult to achieve in traditional lecture formats. Laboratory components supplement traditional lectures in an effort to emphasize active learning and provide higher-order challenges, but these laboratories are often subject to the constraints of (a) increasing student enrollment, (b) limited funding for operational, maintenance, and instructional expenses and (c) increasing demands on undergraduate student credit requirements. Here, we present results from a pilot project implementing virtual (or online) laboratory experiences as an alternative to a traditional laboratory experience in Fluid Mechanics, a required third year course. Students and faculty were surveyed to identify the topics that were most difficult, and virtual laboratory and design components developed to supplement lecture material. Each laboratory includes a traditional lab component, requiring student analysis and evaluation. The lab concludes with a design exercise, which imposes additional problem constraints and allows students to apply their laboratory observations to a real-world situation.

  18. A proven approach for more effective software development and maintenance

    NASA Technical Reports Server (NTRS)

    Pajerski, Rose; Hall, Dana; Sinclair, Craig

    1994-01-01

    Modern space flight mission operations and associated ground data systems are increasingly dependent upon reliable, quality software. Critical functions such as command load preparation, health and status monitoring, communications link scheduling and conflict resolution, and transparent gateway protocol conversion are routinely performed by software. Given budget constraints and the ever increasing capabilities of processor technology, the next generation of control centers and data systems will be even more dependent upon software across all aspects of performance. A key challenge now is to implement improved engineering, management, and assurance processes for the development and maintenance of that software; processes that cost less, yield higher quality products, and that self-correct for continual improvement evolution. The NASA Goddard Space Flight Center has a unique experience base that can be readily tapped to help solve the software challenge. Over the past eighteen years, the Software Engineering Laboratory within the code 500 Flight Dynamics Division has evolved a software development and maintenance methodology that accommodates the unique characteristics of an organization while optimizing and continually improving the organization's software capabilities. This methodology relies upon measurement, analysis, and feedback much analogous to that of control loop systems. It is an approach with a time-tested track record proven through repeated applications across a broad range of operational software development and maintenance projects. This paper describes the software improvement methodology employed by the Software Engineering Laboratory, and how it has been exploited within the Flight Dynamics Division with GSFC Code 500. Examples of specific improvement in the software itself and its processes are presented to illustrate the effectiveness of the methodology. Finally, the initial findings are given when this methodology was applied across the

  19. Data collection procedures for the Software Engineering Laboratory (SEL) database

    NASA Technical Reports Server (NTRS)

    Heller, Gerard; Valett, Jon; Wild, Mary

    1992-01-01

    This document is a guidebook to collecting software engineering data on software development and maintenance efforts, as practiced in the Software Engineering Laboratory (SEL). It supersedes the document entitled Data Collection Procedures for the Rehosted SEL Database, number SEL-87-008 in the SEL series, which was published in October 1987. It presents procedures to be followed on software development and maintenance projects in the Flight Dynamics Division (FDD) of Goddard Space Flight Center (GSFC) for collecting data in support of SEL software engineering research activities. These procedures include detailed instructions for the completion and submission of SEL data collection forms.

  20. Naltrexone Maintenance Decreases Cannabis Self-Administration and Subjective Effects in Daily Cannabis Smokers

    PubMed Central

    Haney, Margaret; Ramesh, Divya; Glass, Andrew; Pavlicova, Martina; Bedi, Gillinder; Cooper, Ziva D

    2015-01-01

    Given that cannabis use is increasing in the United States, pharmacological treatment options to treat cannabis use disorder are needed. Opioid antagonists modulate cannabinoid effects and may offer a potential approach to reducing cannabis use. In this double-blind, placebo-controlled human laboratory study, we assessed the effects of naltrexone maintenance on the reinforcing, subjective, psychomotor, and cardiovascular effects of active and inactive cannabis. Nontreatment-seeking, daily cannabis smokers were randomized to receive naltrexone (50 mg: n=18 M and 5 F) or placebo (0 mg; n=26 M and 2 F) capsules for 16 days. Before, during, and after medication maintenance, participants completed 10 laboratory sessions over 4–6 weeks, assessing cannabis' behavioral and cardiovascular effects. Medication compliance was verified by observed capsule administration, plasma naltrexone, and urinary riboflavin. Relative to placebo, maintenance on naltrexone significantly reduced both active cannabis self-administration and its positive subjective effects (‘good effect'). Participants in the placebo group had 7.6 times (95% CI: 1.1–51.8) the odds of self-administering active cannabis compared with the naltrexone group. This attenuation of reinforcing and positive subjective effects also influenced cannabis use in the natural ecology. Naltrexone had intrinsic effects: decreasing ratings of friendliness, food intake, and systolic blood pressure, and increasing spontaneous reports of stomach upset and headache, yet dropout rates were comparable between groups. In summary, we show for the first time that maintenance on naltrexone decreased cannabis self-administration and ratings of ‘good effect' in nontreatment-seeking daily cannabis smokers. Clinical studies in patients motivated to reduce their cannabis use are warranted to evaluate naltrexone's efficacy as a treatment for cannabis use disorder. PMID:25881117

  1. Preventative Maintenance.

    ERIC Educational Resources Information Center

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  2. Deferred Maintenance.

    ERIC Educational Resources Information Center

    DeLong, Richard A.

    1984-01-01

    Unusually hard hit by the 1970s recession, the University of Michigan accumulated more deferred maintenance problems than could be analyzed efficiently either by hand or with existing computer systems. Using an existing microcomputer and a database management software package, the maintenance service developed its own database to support…

  3. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  4. Maintenance Budgeting.

    ERIC Educational Resources Information Center

    Smith, J. McCree

    Three methods for the preparation of maintenance budgets are discussed--(1) a traditional method, inconclusive and obsolete, based on gross square footage, (2) the formula approach method based on building classification (wood-frame, masonry-wood, masonry-concrete) with maintenance cost factors for each type plus custodial service rates by type of…

  5. Deferred Maintenance.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.

    1980-01-01

    Facilities maintenance is seen as the most important item on the agenda of education in the 1980s. Definite action has been taken to identify deferred maintenance needs of several state systems and private colleges. Identifying and defining the problem is discussed along with comprehensive facilities management and survey guidelines. (MLW)

  6. Software Maintenance.

    ERIC Educational Resources Information Center

    Cannon, Glenn; Jobe, Holly

    Proper cleaning and storage of audiovisual aids is outlined in this brief guide. Materials and equipment needed for first line maintenance are listed, as well as maintenance procedures for records, audio and video tape, film, filmstrips, slides, realia, models, prints, graphics, maps, and overhead transparencies. A 15-item quiz on software…

  7. Illinois Occupational Skill Standards: Industrial Maintenance General Maintenance Cluster.

    ERIC Educational Resources Information Center

    Illinois Occupational Skill Standards and Credentialing Council, Carbondale.

    These skill standards for the industrial maintenance general maintenance cluster are intended to be a guide to workforce preparation program providers in defining content for their programs and to employers to establish the skills and standards necessary for job acquisition. An introduction provides the Illinois perspective; Illinois Occupational…

  8. Comparision of Incidental Reflection From Containerized Maintenance/Housekeeping Solutions and One Inch of Water

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, Bryan Scott; MacQuigg, Michael Robert; Wysong, Andrew Russell

    This document addresses the incidental reflector reactivity worth of containerized maintenance/housekeeping fluids for use in PF-4 at Los Alamos National Laboratory (LANL). The intent of the document is to analyze containerized maintenance/housekeeping fluids which will be analyzed as water that may be present under normal conditions of an operation. The reactivity worth is compared to the reactivity worth due to I-inch of close-fitting 4n water reflection and I-inch of close-fitting radial water reflection. Both have been used to bound incidental reflection by 2-liter bottles in criticality safety evaluations. The conclusion is that, when the maintenance/housekeeping fluids are containerized the reactivitymore » increase from a configuration which is bounding of normal conditions (up to eight bottles modeled with 2-liters of solution at varying diameter) is bound by I-inch of close fitting 4n water relection.« less

  9. Paranal maintenance and CMMS experience

    NASA Astrophysics Data System (ADS)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  10. Consolidated clinical microbiology laboratories.

    PubMed

    Sautter, Robert L; Thomson, Richard B

    2015-05-01

    The manner in which medical care is reimbursed in the United States has resulted in significant consolidation in the U.S. health care system. One of the consequences of this has been the development of centralized clinical microbiology laboratories that provide services to patients receiving care in multiple off-site, often remote, locations. Microbiology specimens are unique among clinical specimens in that optimal analysis may require the maintenance of viable organisms. Centralized laboratories may be located hours from patient care settings, and transport conditions need to be such that organism viability can be maintained under a variety of transport conditions. Further, since the provision of rapid results has been shown to enhance patient care, effective and timely means for generating and then reporting the results of clinical microbiology analyses must be in place. In addition, today, increasing numbers of patients are found to have infection caused by pathogens that were either very uncommon in the past or even completely unrecognized. As a result, infectious disease specialists, in particular, are more dependent than ever on access to high-quality diagnostic information from clinical microbiology laboratories. In this point-counterpoint discussion, Robert Sautter, who directs a Charlotte, NC, clinical microbiology laboratory that provides services for a 40-hospital system spread over 3 states in the southeastern United States explains how an integrated clinical microbiology laboratory service has been established in a multihospital system. Richard (Tom) Thomson of the NorthShore University HealthSystem in Evanston, IL, discusses some of the problems and pitfalls associated with large-scale laboratory consolidation. Copyright © 2015, American Society for Microbiology. All Rights Reserved.

  11. Analytical difficulties facing today's regulatory laboratories: issues in method validation.

    PubMed

    MacNeil, James D

    2012-08-01

    The challenges facing analytical laboratories today are not unlike those faced in the past, although both the degree of complexity and the rate of change have increased. Challenges such as development and maintenance of expertise, maintenance and up-dating of equipment, and the introduction of new test methods have always been familiar themes for analytical laboratories, but international guidelines for laboratories involved in the import and export testing of food require management of such changes in a context which includes quality assurance, accreditation, and method validation considerations. Decisions as to when a change in a method requires re-validation of the method or on the design of a validation scheme for a complex multi-residue method require a well-considered strategy, based on a current knowledge of international guidance documents and regulatory requirements, as well the laboratory's quality system requirements. Validation demonstrates that a method is 'fit for purpose', so the requirement for validation should be assessed in terms of the intended use of a method and, in the case of change or modification of a method, whether that change or modification may affect a previously validated performance characteristic. In general, method validation involves method scope, calibration-related parameters, method precision, and recovery. Any method change which may affect method scope or any performance parameters will require re-validation. Some typical situations involving change in methods are discussed and a decision process proposed for selection of appropriate validation measures. © 2012 John Wiley & Sons, Ltd.

  12. Laboratory Design for Microbiological Safety

    PubMed Central

    Phillips, G. Briggs; Runkle, Robert S.

    1967-01-01

    Of the large amount of funds spent each year in this country on construction and remodeling of biomedical research facilities, a significant portion is directed to laboratories handling infectious microorganisms. This paper is intended for the scientific administrators, architects, and engineers concerned with the design of new microbiological facilities. It develops and explains the concept of primary and secondary barriers for the containment of microorganisms. The basic objectives of a microbiological research laboratory, (i) protection of the experimenter and staff, (ii) protection of the surrounding community, and (iii) maintenance of experimental validity, are defined. In the design of a new infectious-disease research laboratory, early identification should be made of the five functional zones of the facility and their relation to each other. The following five zones and design criteria applicable to each are discussed: clean and transition, research area, animal holding and research area, laboratory support, engineering support. The magnitude of equipment and design criteria which are necessary to integrate these five zones into an efficient and safe facility are delineated. Images Fig. 1 Fig. 3 Fig. 4 Fig. 5 Fig. 6 Fig. 7 Fig. 8 Fig. 9 Fig. 10 Fig. 11 Fig. 12 Fig. 13 Fig. 14 Fig. 15 Fig. 16 Fig. 17 Fig. 18 Fig. 19 PMID:4961771

  13. Radiation and Health Technology Laboratory Capabilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bihl, Donald E.; Lynch, Timothy P.; Murphy, Mark K.

    2005-07-09

    The Radiological Standards and Calibrations Laboratory, a part of Pacific Northwest National Laboratory (PNNL)(a) performs calibrations and upholds reference standards necessary to maintain traceability to national standards. The facility supports U.S. Department of Energy (DOE) programs at the Hanford Site, programs sponsored by DOE Headquarters and other federal agencies, radiological protection programs at other DOE and commercial nuclear sites and research and characterization programs sponsored through the commercial sector. The laboratory is located in the 318 Building of the Hanford Site's 300 Area. The facility contains five major exposure rooms and several laboratories used for exposure work preparation, low-activity instrumentmore » calibrations, instrument performance evaluations, instrument maintenance, instrument design and fabrication work, thermoluminescent and radiochromic Dosimetry, and calibration of measurement and test equipment (M&TE). The major exposure facilities are a low-scatter room used for neutron and photon exposures, a source well room used for high-volume instrument calibration work, an x-ray facility used for energy response studies, a high-exposure facility used for high-rate photon calibration work, a beta standards laboratory used for beta energy response studies and beta reference calibrations and M&TE laboratories. Calibrations are routinely performed for personnel dosimeters, health physics instrumentation, photon and neutron transfer standards alpha, beta, and gamma field sources used throughout the Hanford Site, and a wide variety of M&TE. This report describes the standards and calibrations laboratory.« less

  14. Space shuttle maintenance program planning document

    NASA Technical Reports Server (NTRS)

    Brown, D. V.

    1972-01-01

    A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

  15. Laboratory Information Systems Management and Operations.

    PubMed

    Cucoranu, Ioan C

    2015-06-01

    The main mission of a laboratory information system (LIS) is to manage workflow and deliver accurate results for clinical management. Successful selection and implementation of an anatomic pathology LIS is not complete unless it is complemented by specialized information technology support and maintenance. LIS is required to remain continuously operational with minimal or no downtime and the LIS team has to ensure that all operations are compliant with the mandated rules and regulations. Copyright © 2015 Elsevier Inc. All rights reserved.

  16. Defer Maintenance, Invite Disaster

    ERIC Educational Resources Information Center

    Bowman, William W.

    1977-01-01

    An AGB- and NACUBO-sponsored survey showed that "wish lists" are accumulating overdue major maintenance projects because energy costs are consuming physical plant budgets. Problem areas are discussed: budget "guesstimation," preventive maintenance, deferred maintenance inventory, the APPA accounting format, resource allocation,…

  17. Quality assurance of laboratory work and clinical use of laboratory tests in general practice in norway: a survey.

    PubMed

    Thue, Geir; Jevnaker, Marianne; Gulstad, Guri Andersen; Sandberg, Sverre

    2011-09-01

    Virtually all the general practices in Norway participate in the Norwegian Quality Improvement of Laboratory Services in Primary Care, NOKLUS. In order to assess and develop NOKLUS's services, it was decided to carry out an investigation in the largest participating group, general practices. In autumn 2008 a questionnaire was sent to all Norwegian general practices asking for feedback on different aspects of NOKLUS's main services: contact with medical laboratory technologists, sending of control materials, use and maintenance of practice-specific laboratory binders, courses, and testing of laboratory equipment. In addition, attitudes were elicited towards possible new services directed at assessing other technical equipment and clinical use of tests. Responses were received from 1290 of 1552 practices (83%). The great majority thought that the frequency of sending out control material should continue as at present, and they were pleased with the feedback reports and follow-up by the laboratory technologists in the counties. Even after many years of practical experience, there is still a need to update laboratory knowledge through visits to practices, courses, and written information. Practices also wanted quality assurance of blood pressure meters and spirometers, and many doctors wanted feedback on their use of laboratory tests. Services regarding quality assurance of point-of-care tests, guidance, and courses should be continued. Quality assurance of other technical equipment and of the doctor's clinical use of laboratory tests should be established as part of comprehensive quality assurance.

  18. A&M. TAN607. Sections for second phase expansion: engine maintenance, machine, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. TAN-607. Sections for second phase expansion: engine maintenance, machine, and welding shops; high bay assembly shop, chemical cleaning room (decontamination). Details of sliding door hoods. Approved by INEEL Classification Office for public release. Ralph M. Parsons 1299-5-ANP/GE-3-607-A 109. Date: August 1956. INEEL index code no. 034-0607-00-693-107169 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  19. Pettit performs an in-flight maintenenace on the PWD in the U.S. Laboratory

    NASA Image and Video Library

    2012-02-12

    ISS030-E-074046 (12 Feb. 2012) --- NASA astronaut Don Pettit, Expedition 30 flight engineer, performs in-flight maintenance on the Potable Water Dispenser (PWD) in the Destiny laboratory of the International Space Station.

  20. Pettit performs an in-flight maintenenace on the PWD in the U.S. Laboratory

    NASA Image and Video Library

    2012-02-12

    ISS030-E-074045 (12 Feb. 2012) --- NASA astronaut Don Pettit, Expedition 30 flight engineer, performs in-flight maintenance on the Potable Water Dispenser (PWD) in the Destiny laboratory of the International Space Station.

  1. Pettit performs an in-flight maintenenace on the PWD in the U.S. Laboratory

    NASA Image and Video Library

    2012-02-12

    ISS030-E-074042 (12 Feb. 2012) --- NASA astronaut Don Pettit, Expedition 30 flight engineer, performs in-flight maintenance on the Potable Water Dispenser (PWD) in the Destiny laboratory of the International Space Station.

  2. Pettit performs an in-flight maintenenace on the PWD in the U.S. Laboratory

    NASA Image and Video Library

    2012-02-12

    ISS030-E-074044 (12 Feb. 2012) --- NASA astronaut Don Pettit, Expedition 30 flight engineer, performs in-flight maintenance on the Potable Water Dispenser (PWD) in the Destiny laboratory of the International Space Station.

  3. Maintenance Process Strategic Analysis

    NASA Astrophysics Data System (ADS)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  4. Light Vehicle Preventive Maintenance.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This correspondence course, originally developed for the Marine Corps, is designed to instruct students in the performance of preventive maintenance on motor vehicles. Instructional materials are presented in three chapters as follows: (1) Major Maintenance Areas (maintenance system, tires, batteries, cooling systems, and vehicle lubrication; (2)…

  5. Mycophenolate mofetil as maintenance therapy for childhood-onset systemic lupus erythematosus patients with severe lupus nephritis.

    PubMed

    Kizawa, Toshitaka; Nozawa, Tomo; Kikuchi, Masako; Nagahama, Kiyotaka; Okudela, Koji; Miyamae, Takako; Imagawa, Tomoyuki; Nakamura, Tomoko; Mori, Masaaki; Yokota, Shumpei; Tsutsumi, Hiroyuki

    2015-03-01

    We evaluated histological changes occurring in renal biopsy specimens, between the time before initial induction therapy and after 12 months' maintenance therapy, as well as changes in laboratory parameters, SLE disease activity (SLEDAI), and dosage of corticosteroid (CS) in childhood-onset systemic lupus erythematosus (SLE) patients treated with mycophenolate mofetil (MMF). A retrospective analysis was performed on nine patients diagnosed with childhood-onset SLE and lupus nephritis. They were treated with pulsed mPSL and intravenous cyclophosphamide as induction therapy and MMF (500-1500 mg/day) plus CS as maintenance therapy. Renal biopsy was performed before the initial induction therapy and after 12 months' maintenance therapy. Pathological findings at second biopsy were improved in eight of nine patients (89%). The findings of SLEDAI, urinalysis, and blood tests also showed improvement. CS doses could be tapered satisfactorily. Adverse events were observed in two patients. No patients treated with MMF experienced any disease flares during maintenance therapy. MMF as maintenance therapy might be useful in that not only the histological findings of lupus nephritis were improved, but also CS doses could be beneficially tapered. Nonetheless, this is a retrospective report of only nine cases and further prospective multicenter studies are necessary.

  6. Practitioners' Ideas on Laboratory Skills Competencies Needed for Physical Science Teachers

    ERIC Educational Resources Information Center

    James, Robert K.; Schaaf, Joel

    1975-01-01

    In order to determine the competencies needed for teaching secondary physical science a survey of a sample of physical science teachers in Kansas secondary schools was conducted. The major competencies reported could be classified under the following general headings: equipment purchase and operation, maintenance of laboratory safety, and…

  7. Building Maintenance, Management, and Budgeting.

    ERIC Educational Resources Information Center

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  8. 23 CFR 633.208 - Maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... responsibility of the State. The State may arrange for maintenance of such roads or portions thereof, by... 23 Highways 1 2010-04-01 2010-04-01 false Maintenance. 633.208 Section 633.208 Highways FEDERAL... PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.208 Maintenance. Maintenance of all highway...

  9. Reiter works on LHA in the U.S. Laboratory during Expedition 13

    NASA Image and Video Library

    2006-09-10

    ISS013-E-80086 (10 Sept. 2006) --- European Space Agency (ESA) astronaut Thomas Reiter, Expedition 13 flight engineer, performs in-flight maintenance (IFM) on the lamp housing assembly (LHA) on LAB1P3 rack in the Destiny laboratory of the International Space Station.

  10. Quality-assurance plan for the analysis of fluvial sediment by laboratories of the U.S. Geological Survey

    USGS Publications Warehouse

    Matthes, Wilbur J.; Sholar, Clyde J.; George, John R.

    1992-01-01

    This report describes procedures used by the Iowa District sediment laboratory of the U.S. Geological Survey to assure the quality of sediment-laboratory data. These procedures can be used by other U.S. Geological Survey laboratories regardless of size and type of operation for quality assurance and quality control of specific sediment-laboratory processes. Also described are the equipment, specifications, calibration and maintenance, and the protocol for methods used in the analyses of fluvial sediment for concentration or particle size.

  11. [Accreditation of forensic laboratories].

    PubMed

    Sołtyszewski, Ireneusz

    2010-01-01

    According to the framework decision of the European Union Council, genetic laboratories which perform tests for the benefit of the law enforcement agencies and the administration of justice are required to obtain a certificate of accreditation testifying to compliance with the PN EN ISO/IEC 17025:2005 standard. The certificate is the official confirmation of the competence to perform research, an acknowledgement of credibility, impartiality and professional independence. It is also the proof of establishment, implementation and maintenance of an appropriate management system. The article presents the legal basis for accreditation, the procedure of obtaining the certificate of accreditation and selected elements of the management system.

  12. Visualization of Big Data Through Ship Maintenance Metrics Analysis for Fleet Maintenance and Revitalization

    DTIC Science & Technology

    2014-03-01

    BIG DATA THROUGH SHIP MAINTENANCE METRICS ANALYSIS FOR FLEET MAINTENANCE AND REVITALIZATION by Isaac J. Donaldson March 2014 Thesis...March 2014 3. REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE VISUALIZATION OF BIG DATA THROUGH SHIP MAINTENANCE METRICS...terms of the overall performance of ship maintenance processes is clearly a big data problem. The current process for presenting data on the more than

  13. Fundamentals of bridge maintenance and inspection : manual for a workshop on bridge maintenance/inspection

    DOT National Transportation Integrated Search

    1997-07-01

    This manual supplements the New York State Department of Transportation's one-day workshop on "Bridge Maintenance/Inspection." More specifically, it is intended as a handy reference for preventive-maintenance and corrective-maintenance activities app...

  14. Positioning laboratory automation for today's dynamic climate

    PubMed Central

    Vogt, D. G.

    1994-01-01

    Laboratory automation has existed and matured at Eli Lilly and Company for well over a decade. The author's section serves as a developer of laboratory automation systems for customers within Lilly and embodies ‘robotic friendly’ laboratories with highly technical and experienced personnel. With several systems showing signs of age, second generation ‘smart systems’ have been developed and delivered during the last three years. These systems were built with an ideology different from previous systems. Upon their delivery, the ‘smart systems’ met the customer's functional requirements but the overall acceptance of this ideology is still being debated due to the perception of failure. Much of this perception can be attributed to the delivery of a system heavily dependent on system maintenance, something totally unexpected by the customer. This paper discusses the ideology of a‘smart systems’ and the results following implementation. The events that led to the review and subsequent departure of the ‘smart systems’ ideology are also described. PMID:18924995

  15. IMIS: Integrated Maintenance Information System. A maintenance information delivery concept

    NASA Technical Reports Server (NTRS)

    Vonholle, Joseph C.

    1987-01-01

    The Integrated Maintenance Information System (IMIS) will optimize the use of available manpower, enhance technical performance, improve training, and reduce the support equipment and documentation needed for deployment. It will serve as the technician's single, integrated source of all the technical information required to perform modern aircraft maintenance.

  16. Managing Highway Maintenance: Standards for Maintenance Work, Part 1, Unit 8, Level 2.

    ERIC Educational Resources Information Center

    Federal Highway Administration (DOT), Washington, DC. Offices of Research and Development.

    Part of the series "Managing Highway Maintenance," the unit is about maintenance standards and is designed for superintendents and senior foremen who are responsible for scheduling and controlling routine maintenance. It describes different kinds of standards, why and how standards are developed, and how standards are to be used and…

  17. Asphalt in Pavement Maintenance.

    ERIC Educational Resources Information Center

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  18. Dental Laboratory Career Ladder (AFSC 4Y1X1)

    DTIC Science & Technology

    1994-08-01

    analysis identified one job cluster and seven jobs: Base Dental Lab cluster, Orthodontic Appliance Fabricator job, Fixed Restoration Fabricator job, Crown...reline and repair, removable partial denture construction, crown and fixed partial denture construction, fabrication of orthodontic appliances, and...specialized prostheses. Preventive maintenance and safety precautions for dental laboratory equipment are also stressed . Entry into the career ladder

  19. The ESA Laboratory Support Equipment for the ISS.

    PubMed

    Petrivelli, A

    2002-02-01

    The Laboratory Support Equipment (LSE) for the International Space Station (ISS) is a suite of general-purpose items that will be available onboard the Station either as self-standing facilities or as equipment that can be used at defined locations. Dedicated to supporting system maintenance and payload operations, some LSE items are derived from commercial equipment, while others have been specifically developed for the ISS. ESA is currently engaged in developing three pressurised facilities and one pointing mechanism that will become part of the LSE complement, namely: the Minus Eighty degree centigrade Laboratory Freezer for the ISS (MELFI), the Microgravity Science Glovebox (MSG), the cryogenic storage and quick/snap freezer system (Cryosystem), the external-payload pointing system (Hexapod).

  20. Machine Maintenance Scheduling with Reliability Engineering Method and Maintenance Value Stream Mapping

    NASA Astrophysics Data System (ADS)

    Sembiring, N.; Nasution, A. H.

    2018-02-01

    Corrective maintenance i.e replacing or repairing the machine component after machine break down always done in a manufacturing company. It causes the production process must be stopped. Production time will decrease due to the maintenance team must replace or repair the damage machine component. This paper proposes a preventive maintenance’s schedule for a critical component of a critical machine of an crude palm oil and kernel company due to increase maintenance efficiency. The Reliability Engineering & Maintenance Value Stream Mapping is used as a method and a tool to analize the reliability of the component and reduce the wastage in any process by segregating value added and non value added activities.

  1. MTRETR MAINTENANCE SHOP, TRA653. FLOOR PLAN FOR FIRST FLOOR: MACHINE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MTR-ETR MAINTENANCE SHOP, TRA-653. FLOOR PLAN FOR FIRST FLOOR: MACHINE SHOP, ELECTRICAL AND INSTRUMENT SHOP, TOOL CRIB, ELECTRONIC SHOP, LOCKER ROOM, SPECIAL TEMPERATURE CONTROLLED ROOM, AND OFFICES. "NEW" ON DRAWING REFERS TO REVISION OF 11/1956 DRAWING ON WHICH AREAS WERE DESIGNATED AS "FUTURE." HUMMEL HUMMEL & JONES 810-MTR-ETR-653-A-7, 5/1957. INL INDEX NO. 532-0653-00-381-101839, REV. 2. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  2. Maintenance Trades Guidelines

    ERIC Educational Resources Information Center

    Weidner, Theodore J.

    2008-01-01

    In 2002, APPA published "Maintenance Staffing Guidelines for Educational Facilities," the first building maintenance trades staffing guideline designed to assist educational facilities professionals with their staffing needs. addresses how facilities professionals can determine the appropriate size and mix of their organization. Contents…

  3. A remote laboratory for USRP-based software defined radio

    NASA Astrophysics Data System (ADS)

    Gandhinagar Ekanthappa, Rudresh; Escobar, Rodrigo; Matevossian, Achot; Akopian, David

    2014-02-01

    Electrical and computer engineering graduates need practical working skills with real-world electronic devices, which are addressed to some extent by hands-on laboratories. Deployment capacity of hands-on laboratories is typically constrained due to insufficient equipment availability, facility shortages, and lack of human resources for in-class support and maintenance. At the same time, at many sites, existing experimental systems are usually underutilized due to class scheduling bottlenecks. Nowadays, online education gains popularity and remote laboratories have been suggested to broaden access to experimentation resources. Remote laboratories resolve many problems as various costs can be shared, and student access to instrumentation is facilitated in terms of access time and locations. Labs are converted to homeworks that can be done without physical presence in laboratories. Even though they are not providing full sense of hands-on experimentation, remote labs are a viable alternatives for underserved educational sites. This paper studies remote modality of USRP-based radio-communication labs offered by National Instruments (NI). The labs are offered to graduate and undergraduate students and tentative assessments support feasibility of remote deployments.

  4. Maintenance of Automated Library Systems.

    ERIC Educational Resources Information Center

    Epstein, Susan Baerg

    1983-01-01

    Discussion of the maintenance of both the software and hardware in an automated library system highlights maintenance by the vendor, contracts and costs, the maintenance log, downtime, and planning for trouble. (EJS)

  5. General aviation avionics equipment maintenance

    NASA Technical Reports Server (NTRS)

    Parker, C. D.; Tommerdahl, J. B.

    1978-01-01

    Maintenance of general aviation avionics equipment was investigated with emphasis on single engine and light twin engine general aviation aircraft. Factors considered include the regulatory agencies, avionics manufacturers, avionics repair stations, the statistical character of the general aviation community, and owners and operators. The maintenance, environment, and performance, repair costs, and reliability of avionics were defined. It is concluded that a significant economic stratification is reflected in the maintenance problems encountered, that careful attention to installations and use practices can have a very positive impact on maintenance problems, and that new technologies and a general growth in general aviation will impact maintenance.

  6. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    ERIC Educational Resources Information Center

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  7. Themes from a Camp Maintenance Network: Camp Maintenance and Property Personnel Share Their Insights and Challenges.

    ERIC Educational Resources Information Center

    Whyman, Wynne

    2003-01-01

    A camp maintenance survey was completed by maintenance personnel from 99 camps. Results highlighted several important considerations: ensuring sufficient maintenance funds for aging infrastructure, including camp/property personnel in decision making, publicizing completed maintenance projects, examining long-term needs of the land, and adopting…

  8. Building Component Maintenance and Repair Data Base: Heating, Ventilating, and Air Conditioning (HVAC) Systems

    DTIC Science & Technology

    1991-05-01

    Building Component Maintenance and Repair Data Base: Heating, Ventilating, and Air Conditioning (HVAC) Systems by Edgar S. Neely Robert D. Neathammer...Repair Data Base: Heating, Ventilating, and Air Conditioning (HVAC) Systems RDTE dated 1980EIMB 1984 - 1989 6. AUTHOR(S) Edgar S. Neely, Robert D...Laboratory (USACERL). The Principal Investigators were Dr. Edgar Neely and Mr. Robert Neathammer (USACERL-FS). The primary contractor for much of the

  9. Plant maintenance and advanced reactors issue, 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agnihotri, Newal

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada;more » Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.« less

  10. Optimized protocols for Mycobacterium leprae strain management: frozen stock preservation and maintenance in athymic nude mice.

    PubMed

    Trombone, Ana Paula Fávaro; Pedrini, Sílvia Cristina Barbosa; Diório, Suzana Madeira; Belone, Andréa de Faria Fernandes; Fachin, Luciana Raquel Vicenzi; do Nascimento, Dejair Caitano; Rosa, Patricia Sammarco

    2014-03-23

    Leprosy, caused by Mycobacterium leprae, is an important infectious disease that is still endemic in many countries around the world, including Brazil. There are currently no known methods for growing M. leprae in vitro, presenting a major obstacle in the study of this pathogen in the laboratory. Therefore, the maintenance and growth of M. leprae strains are preferably performed in athymic nude mice (NU-Foxn1(nu)). The laboratory conditions for using mice are readily available, easy to perform, and allow standardization and development of protocols for achieving reproducible results. In the present report, we describe a simple protocol for purification of bacilli from nude mouse footpads using trypsin, which yields a suspension with minimum cell debris and with high bacterial viability index, as determined by fluorescent microscopy. A modification to the standard method for bacillary counting by Ziehl-Neelsen staining and light microscopy is also demonstrated. Additionally, we describe a protocol for freezing and thawing bacillary stocks as an alternative protocol for maintenance and storage of M. leprae strains.

  11. Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

  12. Management Aspects of Software Maintenance.

    DTIC Science & Technology

    1984-09-01

    educated in * the complex nature of software maintenance to be able to properly evaluate and manage the software maintenance effort. In this...maintenance and improvement may be called "software evolution". The soft- ware manager must be Educated in the complex nature cf soft- Iware maintenance to be...complaint of error or request for modification is also studied in order to determine what action needs tc be taken. 2. Define Objective and Approach :

  13. Fixing Maintenance Productivity.

    ERIC Educational Resources Information Center

    Fickes, Michael

    2003-01-01

    Describes how one university's facility managers use Nextel communications technology in conjunction with a Famis Software maintenance management system to improve the productivity of its maintenance technicians. The system uses a wireless Internet connection to automate the flow of work order information to and from technicians. The key to these…

  14. [Medical Equipment Maintenance Methods].

    PubMed

    Liu, Hongbin

    2015-09-01

    Due to the high technology and the complexity of medical equipment, as well as to the safety and effectiveness, it determines the high requirements of the medical equipment maintenance work. This paper introduces some basic methods of medical instrument maintenance, including fault tree analysis, node method and exclusive method which are the three important methods in the medical equipment maintenance, through using these three methods for the instruments that have circuit drawings, hardware breakdown maintenance can be done easily. And this paper introduces the processing methods of some special fault conditions, in order to reduce little detours in meeting the same problems. Learning is very important for stuff just engaged in this area.

  15. Lipid and lipoprotein testing in resource-limited laboratories.

    PubMed

    Myers, Gary L

    2003-01-01

    The role of total cholesterol (TC) and lipoproteins in the assessment of coronary heart disease (CHD) is firmly established from population and intervention studies. Total and low-density lipoprotein cholesterol (LDLC) levels are positively associated with CHD, and high-density lipoprotein cholesterol (HDLC) levels are negatively associated with CHD. Efforts to identify and treat people at increased risk based on cholesterol and lipoprotein levels have led to more lipid testing and the need for very reliable test results. Thus, quality laboratory services are an essential component of healthcare delivery and play a vital role in any strategy to reduce morbidity and mortality from CHD. In laboratories with limited resources, establishing laboratory capability to measure CHD risk markers may be a considerable challenge. Laboratories face problems in selecting proper techniques, difficulties in equipment availability and maintenance, and shortage of supplies, staffing, and supervision. The Centers for Disease Control and Prevention (CDC) has been providing technical assistance for more than 30 years to laboratories that measure lipids and lipoproteins and is willing to provide technical assistance as needed for other laboratories to develop this capability. CDC can provide technical assistance to establish lipid and lipoprotein testing capability to support a CHD public health program in areas with limited laboratory resources. This assistance includes: selecting a suitable testing instrument; providing training for laboratory technicians; establishing a simple quality control plan; and instructing staff on how to prepare frozen serum control materials suitable for assessing accuracy of lipid and lipoprotein testing.

  16. Differing antidepressant maintenance methodologies.

    PubMed

    Safer, Daniel J

    2017-10-01

    The principle evidence that antidepressant medication (ADM) is an effective maintenance treatment for adults with major depressive disorder (MDD) is from placebo substitution trials. These trials enter responders from ADM efficacy trials into randomized, double-blind placebo-controlled (RDBPC) effectiveness trials to measure the rate of MDD relapse over time. However, other randomized maintenance trial methodologies merit consideration and comparison. A systematic review of ADM randomized maintenance trials included research reports from multiple databases. Relapse rate was the main effectiveness outcome assessed. Five ADM randomized maintenance methodologies for MDD responders are described and compared for outcome. These effectiveness trials include: placebo-substitution, ADM/placebo extension, ADM extension, ADM vs. psychotherapy, and treatment as usual. The placebo-substitution trials for those abruptly switched to placebo resulted in unusually high (46%) rates of relapse over 6-12months, twice the continuing ADM rate. These trials were characterized by selective screening, high attrition, an anxious anticipation of a switch to placebo, and a risk of drug withdrawal symptoms. Selectively screened ADM efficacy responders who entered into 4-12month extension trials experienced relapse rates averaging ~10% with a low attrition rate. Non-industry sponsored randomized trials of adults with multiple prior MDD episodes who were treated with ADM maintenance for 1-2years experienced relapse rates averaging 40%. Placebo substitution trial methodology represents only one approach to assess ADM maintenance. Antidepressant maintenance research for adults with MDD should be evaluated for industry sponsorship, attrition, the impact of the switch to placebo, and major relapse differences in MDD subpopulations. Copyright © 2017. Published by Elsevier Inc.

  17. Microcomputer software to facilitate costing in pathology laboratories.

    PubMed Central

    Stilwell, J A; Woodford, F P

    1987-01-01

    A software program is described which will enable laboratory managers to calculate, for their laboratory over a 12 month period, the cost of each test or investigation and of components of that cost. These comprise the costs of direct labour, consumables, equipment maintenance and depreciation; allocated costs of intermediate operations--for example, specimen procurement, reception, and data processing; and apportioned indirect costs such as senior staff time as well as external overheads such as telephone charges, rent, and rates. Total annual expenditure on each type of test is also calculated. The principles on which the program is based are discussed. Considered in particular, are the problems of apportioning indirect costs (which are considerable in clinical laboratory work) over different test costs, and the merits of different ways of estimating the amount or fraction of staff members' time spent on each kind of test. The computer program is Crown copyright but is available under licence from one of us (JAS). PMID:3654982

  18. 22 CFR 120.38 - Maintenance levels.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Maintenance levels. 120.38 Section 120.38 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.38 Maintenance levels. (a) Organizational-level maintenance (or basic-level maintenance) is the...

  19. PREVENTIVE MAINTENANCE. HONEYWELL PLANNING GUIDE.

    ERIC Educational Resources Information Center

    Honeywell, Inc., Minneapolis, Minn.

    THIS HONEYWELL PAMPHLET DISCUSSES SOME ASPECTS OF PREVENTIVE MAINTENANCE OF AUTOMATIC CONTROLS, HEATING, VENTILATING, AND AIR CONDITIONING, AND COMPARES IN-PLANT WITH CONTRACT SERVICE, CONCLUDING THAT CONTRACT SERVICE IS PREFERABLE AND DESCRIBING A NUMBER OF MAINTENANCE PLANS WHICH THEY FURNISH. PREVENTIVE MAINTENANCE PROVIDES--(1) MORE EFFICIENT…

  20. 43 CFR 3830.20 - Payment of service charges, location fees, initial maintenance fees, annual maintenance fees and...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Payment of service charges, location fees, initial maintenance fees, annual maintenance fees and oil shale fees. 3830.20 Section 3830.20 Public Lands..., initial maintenance fees, annual maintenance fees and oil shale fees. ...

  1. 43 CFR 3830.20 - Payment of service charges, location fees, initial maintenance fees, annual maintenance fees and...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Payment of service charges, location fees, initial maintenance fees, annual maintenance fees and oil shale fees. 3830.20 Section 3830.20 Public Lands..., initial maintenance fees, annual maintenance fees and oil shale fees. ...

  2. 43 CFR 3830.20 - Payment of service charges, location fees, initial maintenance fees, annual maintenance fees and...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Payment of service charges, location fees, initial maintenance fees, annual maintenance fees and oil shale fees. 3830.20 Section 3830.20 Public Lands..., initial maintenance fees, annual maintenance fees and oil shale fees. ...

  3. 43 CFR 3830.20 - Payment of service charges, location fees, initial maintenance fees, annual maintenance fees and...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Payment of service charges, location fees, initial maintenance fees, annual maintenance fees and oil shale fees. 3830.20 Section 3830.20 Public Lands..., initial maintenance fees, annual maintenance fees and oil shale fees. ...

  4. 23 CFR 1.27 - Maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Maintenance. 1.27 Section 1.27 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GENERAL MANAGEMENT AND ADMINISTRATION GENERAL § 1.27 Maintenance... maintenance of projects shall be carried out in accordance with policies and procedures issued by the...

  5. Myths and realities of electronics maintenance.

    PubMed

    Harris, Douglas H

    2008-06-01

    The author presents and discusses discoveries and developments contributing to enhanced electronics maintenance performance. This body of research is viewed from the vantage point of Nick Bond's 1970 Ely Award-winning article in Human Factors, "Some Persistent Myths About Military Electronics Maintenance." Bond identified a set of myths and summarized research that not only produced information and techniques leading to demonstrably improved maintenance performance but also exploded many unfounded beliefs that were commonly held before the research had been conducted and the findings disseminated. The period from 1964 through 1986, as reflected by publications in the journal, was a productive period of research that led to greater understanding of human factors in electronics maintenance and to numerous advances that contributed, ultimately, to more effective maintenance performance. Technological advances, combined with what we learned about maintenance performance, have substantially reduced the maintenance burden and enhanced the maintenance of electronic systems. Some of the principal lessons learned from this research on electronics maintenance apply to understanding the effects of equipment complexity, providing an optimal role for automation, designing more appropriate on-the-job training, and enhancing troubleshooting skills.

  6. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XX, CUMMINS DIESEL ENGINE, MAINTENANCE SUMMARY.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF THE REASONS AND PROCEDURES FOR DIESEL ENGINE MAINTENANCE. TOPICS ARE WHAT ENGINE BREAK-IN MEANS, ENGINE BREAK-IN, TORQUING BEARINGS (TEMPLATE METHOD), AND THE NEED FOR MAINTENANCE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "CUMMINS DIESEL ENGINE…

  7. A Portable Cell Maintenance System for Rapid Toxicity Monitoring Final Report CRADA No. TC-02081-04

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kane, S.; Zhou, P.

    The Phase I STTR research project was targeted at meeting the objectives and requirements stated in STTR solicitation A04-T028 for a Portable Cell Maintenance System for Rapid Toxicity Monitoring. In accordance with the requirements for STTR programs, collaboration was formed between a small business, Kionix, Inc., and The Regents of the University of California, Lawrence Livermore National Laboratory (LLNL). The collaboration included CytoDiscovery, Inc. (CDI) which, in collaboration with Kionix, provided access to membrane chip technology and provided program support and coordination. The objective of the overall program (excerpted from the original solicitation) was: “To develop a small, portable cellmore » maintenance system for the transport, storage, and monitoring of viable vertebrate cells and tissues.” The goal of the Phase I project was to demonstrate the feasibility of achieving the program objectives utilizing a system comprised of a small-size, microfluidic chip-based cell maintenance cartridge (CMC) and a portable cell maintenance system (CMS) capable of housing a minimum of four CMCs. The system was designed to be capable of optimally maintaining multiple vertebrate cell types while supporting a wide variety of cellular assays.« less

  8. Managing Highway Maintenance: Management Data and Maintenance Standards; Levels 1 & 2, For Training in Maintenance Standards and Crew Scheduling.

    ERIC Educational Resources Information Center

    Federal Highway Administration (DOT), Washington, DC. Offices of Research and Development.

    Part of the series "Managing Highway Maintenance," the unit is designed for use with unit eight, level one, and unit 13, level two, and the certification tests for those units in the series. It contains typical management data and selected highway maintenance standards for the areas of: surface and shoulder; roadside and drainage; traffic…

  9. [Hospital maintenance: management, risks, and responsibilities].

    PubMed

    Rabino, F

    2002-01-01

    Principal activities of maintenance carried out in hospital, staff required, various type of organization (inside team or global service), management aspects are described. Subjects responsible of maintenance are characterized and the relationships between Service of Maintenance and Service of Prevention and Protection in hospital are specified. Responsibility aspects concerning safety of maintenance workers and main risks which are exposed are defined. The importance of disponibility of a good maintenance handbook and of projects and programs of practice for new hospitals are emphasized.

  10. Movable bridge maintenance monitoring.

    DOT National Transportation Integrated Search

    2013-10-01

    Movable bridges have particular maintenance issues, which cost considerably more than those of fixed bridges, : mostly because of the complex interaction of the mechanical, electrical and structural components. In order to track : maintenance and ope...

  11. Unsurfaced Road Maintenance Management

    DOT National Transportation Integrated Search

    1992-12-01

    This draft manual describes an unsurfaced road maintenance management system for use on military installations. This system is available in either a manual or computerized mode (Micro PAVER). The maintenance standards prescribed should protect Govern...

  12. Improving software maintenance through measurement

    NASA Technical Reports Server (NTRS)

    Rombach, H. Dieter; Ulery, Bradford T.

    1989-01-01

    A practical approach to improving software maintenance through measurements is presented. This approach is based on general models for measurement and improvement. Both models, their integration, and practical guidelines for transferring them into industrial maintenance settings are presented. Several examples of applications of the approach to real-world maintenance environments are discussed.

  13. Winter maintenance performance measure.

    DOT National Transportation Integrated Search

    2016-01-01

    The Winter Performance Index is a method of quantifying winter storm events and the DOTs response to them. : It is a valuable tool for evaluating the States maintenance practices, performing post-storm analysis, training : maintenance personnel...

  14. [CAP quality management system in clinical laboratory and its issue].

    PubMed

    Tazawa, Hiromitsu

    2004-03-01

    The CAP (College of American Pathologists) was established in 1962 and, at present, CAP-accredited laboratories include about 6000 institutions all over the world, mainly in the U.S. The essential purpose of CAP accreditation is high quality reservation and improvement of clinical laboratory services for patient care, and is based on seven points, listed below. (1) Establishment of a laboratory management program and laboratory techniques to assure accuracy and improve overall quality of laboratory services. (2) Maintenance and improvement of accuracy objectively by centering on a CAP survey. (3) Thoroughness in safety and health administration. (4) Reservation of the performance of laboratory services by personnel and proficiency management. (5) Provision of appropriate information to physicians, and contribution to improved quality of patient care by close communication with physicians (improvement in patient care). (6) Reduction of running costs and personnel costs based on evidence by employing the above-mentioned criteria. (7) Reduction of laboratory error. In the future, accreditation and/or certification by organizations such as CAP, ISO, etc., may become a requirement for providing any clinical laboratory services in Japan. Taking the essence of the CAP and the characteristics of the new international standard, ISO151589, into consideration, it is important to choose the best suited accreditation and/or certification depending of the purpose of clinical laboratory.

  15. Space Telescope maintenance and refurbishment

    NASA Technical Reports Server (NTRS)

    Trucks, H. F.

    1983-01-01

    The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

  16. AUTOMOTIVE DIESEL MAINTENANCE. PROGRAM OUTLINE.

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    INFORMATIONAL TOPICS COVERED IN THE TEXT MATERIALS AND SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILMS FOR A 2-YEAR, 55 MODULE PROGRAM IN AUTOMOTIVE DIESEL MAINTENANCE ARE GIVEN. THE 30 MODULES FOR "AUTOMOTIVE DIESEL MAINTENANCE 1" ARE AVAILABLE AS VT 005 655 - VT 005 684, AND THE 25 MODULES FOR "AUTOMOTIVE DIESEL MAINTENANCE 2" ARE AVAILABLE…

  17. Clinical laboratory studies of disinfection with Sporicidin.

    PubMed Central

    Isenberg, H D

    1985-01-01

    The clinical microbiology laboratory evaluation of disinfectants can serve as a guide for their application to reduce hospital-acquired infections. The use of Sporicidin, a glutaraldehyde-phenol formulation, was evaluated by the application of modified MIC and MBC determinations for standard organisms. In addition, the effect of this formulation on bacteria that may proliferate in water at ambient temperatures was studied. This investigation indicated that such studies can help the clinical microbiologist to guide the use of disinfectants and sterilants for the maintenance of a safe hospital environment. PMID:3932457

  18. Health and safety in clinical laboratories in developing countries: safety considerations.

    PubMed

    Ejilemele, A A; Ojule, A C

    2004-01-01

    Clinical laboratories are potentially hazardous work areas. Health and safety in clinical laboratories is becoming an increasingly important subject as a result of the emergence of highly infectious diseases such as hepatitis and HIV. This is even more so in developing countries where health and safety have traditionally been regarded as low priority issues, considering the more important health problems confronting the health authorities in these countries. We conducted a literature search using the medical subheadings titles on the INTERNET over a period of twenty years and summarized our findings. This article identifies hazards in the laboratories and highlights measures to make the laboratory a safer work place. It also emphasizes the mandatory obligations of employers and employees towards the attainment of acceptable safety standards in clinical laboratories in Third World countries in the face of the current HIV/AIDS epidemic in many of these developing countries especially in the sub-Saharan Africa while accommodating the increasing work load in these laboratories. Both the employer and the employee have major roles to play in the maintenance of a safe working environment. This can be achieved if measures discussed are incorporated into everyday laboratory practice.

  19. Space station orbit maintenance

    NASA Technical Reports Server (NTRS)

    Kaplan, D. I.; Jones, R. M.

    1983-01-01

    The orbit maintenance problem is examined for two low-earth-orbiting space station concepts - the large, manned Space Operations Center (SOC) and the smaller, unmanned Science and Applications Space Platform (SASP). Atmospheric drag forces are calculated, and circular orbit altitudes are selected to assure a 90 day decay period in the event of catastrophic propulsion system failure. Several thrusting strategies for orbit maintenance are discussed. Various chemical and electric propulsion systems for orbit maintenance are compared on the basis of propellant resupply requirements, power requirements, Shuttle launch costs, and technology readiness.

  20. Assessing the outcome of Strengthening Laboratory Management Towards Accreditation (SLMTA) on laboratory quality management system in city government of Addis Ababa, Ethiopia

    PubMed Central

    Sisay, Abay; Mindaye, Tedla; Tesfaye, Abrham; Abera, Eyob; Desale, Adino

    2015-01-01

    Introduction Strengthening Laboratory Management Toward Accreditation (SLMTA) is a competency-based management training programme designed to bring about immediate and measurable laboratory improvement. The aim of this study is to assess the outcome of SLMTA on laboratory quality management system in Addis Ababa, Ethiopia. Methods The study used an Institutional based cross sectional study design that employed a secondary and primary data collection approach on the participated institution of medical laboratory in SLMTA. The study was conducted in Addis Ababa city government and the data was collected from February ‘April 2014 and data was entered in to EPI-data version 3.1 and was analyzed by SPSS version 20. Results The assessment finding indicate that there was a significant improvement in average scores (141.4; range of 65-196, 95%CI =86.275-115.5, p = 0.000) at final with 3 laboratories become 3 star, 6 laboratories were at 2 star, 11 were 1 star. Laboratory facilities respondents which thought getting adequate and timely manner mentorship were found 2.5 times more likely to get good success in the final score(AOR= 2.501, 95% CI= 1.109-4.602) than which did not get it. Conclusion At the end of SLMTA implementation,3 laboratories score 3 star, 6 laboratories were at 2 star, 11 were at 1 star. The most important contributing factor for not scoring star in the final outcome of SLMTA were not conducting their customer satisfaction survey, poor staff motivation, and lack of regular equipment service maintenance. Mentorship, onsite and offsite coaching and training activities had shown a great improvement on laboratory quality management system in most laboratories. PMID:26175805

  1. Assessing the outcome of Strengthening Laboratory Management Towards Accreditation (SLMTA) on laboratory quality management system in city government of Addis Ababa, Ethiopia.

    PubMed

    Sisay, Abay; Mindaye, Tedla; Tesfaye, Abrham; Abera, Eyob; Desale, Adino

    2015-01-01

    Strengthening Laboratory Management Toward Accreditation (SLMTA) is a competency-based management training programme designed to bring about immediate and measurable laboratory improvement. The aim of this study is to assess the outcome of SLMTA on laboratory quality management system in Addis Ababa, Ethiopia. The study used an Institutional based cross sectional study design that employed a secondary and primary data collection approach on the participated institution of medical laboratory in SLMTA. The study was conducted in Addis Ababa city government and the data was collected from February 'April 2014 and data was entered in to EPI-data version 3.1 and was analyzed by SPSS version 20. The assessment finding indicate that there was a significant improvement in average scores (141.4; range of 65-196, 95%CI=86.275-115.5, p=0.000) at final with 3 laboratories become 3 star, 6 laboratories were at 2 star, 11 were 1 star. Laboratory facilities respondents which thought getting adequate and timely manner mentorship were found 2.5 times more likely to get good success in the final score(AOR=2.501, 95% CI=1.109-4.602) than which did not get it. At the end of SLMTA implementation,3 laboratories score 3 star, 6 laboratories were at 2 star, 11 were at 1 star. The most important contributing factor for not scoring star in the final outcome of SLMTA were not conducting their customer satisfaction survey, poor staff motivation, and lack of regular equipment service maintenance. Mentorship, onsite and offsite coaching and training activities had shown a great improvement on laboratory quality management system in most laboratories.

  2. To have and to hold: gratitude promotes relationship maintenance in intimate bonds.

    PubMed

    Gordon, Amie M; Impett, Emily A; Kogan, Aleksandr; Oveis, Christopher; Keltner, Dacher

    2012-08-01

    This multimethod series of studies merges the literatures on gratitude and risk regulation to test a new process model of gratitude and relationship maintenance. We develop a measure of appreciation in relationships and use cross-sectional, daily experience, observational, and longitudinal methods to test our model. Across studies, we show that people who feel more appreciated by their romantic partners report being more appreciative of their partners. In turn, people who are more appreciative of their partners report being more responsive to their partners' needs (Study 1), and are more committed and more likely to remain in their relationships over time (Study 2). Appreciative partners are also rated by outside observers as relatively more responsive and committed during dyadic interactions in the laboratory, and these behavioral displays are one way in which appreciation is transmitted from one partner to the other (Study 3). These findings provide evidence that gratitude is important for the successful maintenance of intimate bonds.

  3. Housing and maintenance of Ambystoma mexicanum, the Mexican axolotl.

    PubMed

    Farkas, Johanna E; Monaghan, James R

    2015-01-01

    The aim of this paper is to assemble a significant amount of information on Ambystoma mexicanum, the axolotl salamander, to assist in the basic knowledge needed to raise, breed, and study most aspects of axolotl biology. It is important to understand the basic biology of the axolotl in order to make informed decisions on their proper care and use in experiments. Therefore, we will provide necessary information to the non-herpetologist that will assist in their study of this unique and fascinating animal. We also aim to provide a resource on the general anatomy, behavior, and experimental tips specific to the Mexican axolotl that will be of use to most axolotl laboratories. Axolotls have been actively researched since the 1860s, giving testament to their relatively straightforward maintenance and their versatility as an animal model for development and regeneration. Interest in using the axolotl in laboratory research has grown tremendously over the past decade, so dedicated resources to support the study of this species are needed and encouraged.

  4. The Intrinsic Value of Campus Maintenance.

    ERIC Educational Resources Information Center

    Yeatts, G. Dewey

    2003-01-01

    Discusses how an emphasis on student recruitment, combined with deferred maintenance backlogs and maintenance budget cuts, suggest that further study needs to be done on the intrinsic value of campus maintenance. (EV)

  5. A Methodical Approach to the Creation, Operation, and Enhancement of a General-use Microcomputer Laboratory.

    ERIC Educational Resources Information Center

    Seilheimer, Steven D.

    1988-01-01

    Outlines procedures for developing a microcomputer laboratory for use by students in an academic organization, based on experiences at Niagara University. The four phases described include: (1) needs assessment; (2) establishment, including software and hardware selection and physical facilities; (3) operation, including staffing, maintenance,…

  6. Laboratory Safety Monitoring of Chronic Medications in Ambulatory Care Settings

    PubMed Central

    Hurley, Judith S; Roberts, Melissa; Solberg, Leif I; Gunter, Margaret J; Nelson, Winnie W; Young, Linda; Frost, Floyd J

    2005-01-01

    OBJECTIVE To evaluate laboratory safety monitoring in patients taking selected chronic prescription drugs. DESIGN Retrospective study using 1999–2001 claims data to calculate rates of missed laboratory tests (potential laboratory monitoring errors). Eleven drugs/drug groups and 64 laboratory tests were evaluated. SETTING Two staff/network model health maintenance organizations. PATIENTS Continuously enrolled health plan members age≥19 years taking ≥1 chronic medications. MEASUREMENTS AND MAIN RESULTS Among patients taking chronic medications (N=29,823 in 1999, N=32,423 in 2000, and N=36,811 in 2001), 47.1% in 1999, 45.0% in 2000, and 44.0% in 2001 did not receive ≥1 test recommended for safety monitoring. Taking into account that patients were sometimes missing more than 1 test for a given drug and that patients were frequently taking multiple drugs, the rate of all potential laboratory monitoring errors was 849/1,000 patients/year in 1999, 810/1,000 patients/year in 2000, and 797/1,000 patients/year in 2001. Rates of potential laboratory monitoring errors varied considerably across individual drugs and laboratory tests. CONCLUSIONS Lapses in laboratory monitoring of patients taking selected chronic medications were common. Further research is needed to determine whether, and to what extent, this failure to monitor patients is associated with adverse clinical outcomes. PMID:15857489

  7. TCMS operations and maintenance philosophy

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Griffin, Rock E.

    1992-01-01

    The purpose is to describe the basic philosophies of operating and maintaining the Test, Control, and Monitor System (TCMS) equipment. TCMS is a complex and sophisticated checkout system. Operations and maintenance processes developed to support it will be based upon current experience, but will be focused on the specific needs of TCMS in support of Space Station Freedom Program (SSFP) and related activities. An overview of the operations and maintenance goals and philosophies are presented. The assumptions, roles and responsibilities, concepts and interfaces for operation, on-line maintenance, off-line support, and Operations and Maintenance (O&M) personnel training on all TCMS equipment located at KSC are described.

  8. Evaluation of substitute diets for live algae in the captive maintenance of adult and subadult unionidae

    USGS Publications Warehouse

    Nichols, S. Jerrine; Garling, D.

    2002-01-01

    Ten nonlive algal diets were evaluated as potential broodstock diets for adult and subadult unionids. These diets varied significantly in their ability to support growth, reproduction and survival. Growth, increase in glycogen stores, and limited glochidial formation were seen in most unionid species on two of the diets. However, long-term survival (>3 y) remained problematic, and the cause of mortality in these animals could not be determined. While two of the diets tested are potentially useful for supplemental feeding of adult unionids to increase glycogen levels during quarantine, or during short-term captive maintenance in the laboratory, none can be recommended without reservation for long-term maintenance because of the lack of survival after three years during this study.

  9. Recommendation for the review of biological reference intervals in medical laboratories.

    PubMed

    Henny, Joseph; Vassault, Anne; Boursier, Guilaine; Vukasovic, Ines; Mesko Brguljan, Pika; Lohmander, Maria; Ghita, Irina; Andreu, Francisco A Bernabeu; Kroupis, Christos; Sprongl, Ludek; Thelen, Marc H M; Vanstapel, Florent J L A; Vodnik, Tatjana; Huisman, Willem; Vaubourdolle, Michel

    2016-12-01

    This document is based on the original recommendation of the Expert Panel on the Theory of Reference Values of the International Federation of Clinical Chemistry and Laboratory Medicine (IFCC), updated guidelines were recently published under the auspices of the IFCC and the Clinical and Laboratory Standards Institute (CLSI). This document summarizes proposals for recommendations on: (i) The terminology, which is often confusing, noticeably concerning the terms of reference limits and decision limits. (ii) The method for the determination of reference limits according to the original procedure and the conditions, which should be used. (iii) A simple procedure allowing the medical laboratories to fulfill the requirements of the regulation and standards. The updated document proposes to verify that published reference limits are applicable to the laboratory involved. Finally, the strengths and limits of the revised recommendations (especially the selection of the reference population, the maintenance of the analytical quality, the choice of the statistical method used…) will be briefly discussed.

  10. Deferred School Maintenance Creates National Crises.

    ERIC Educational Resources Information Center

    Geiger, Philip E.

    2002-01-01

    Describes the cost and causes of the school maintenance "crises"; lists seven questions to determine if a school district has a quality maintenance program; describes consequences of deferred school maintenance in Yuma (Arizona) Union High School District. (PKP)

  11. Operational Interventions to Maintenance Error

    NASA Technical Reports Server (NTRS)

    Kanki, Barbara G.; Walter, Diane; Dulchinos, VIcki

    1997-01-01

    A significant proportion of aviation accidents and incidents are known to be tied to human error. However, research of flight operational errors has shown that so-called pilot error often involves a variety of human factors issues and not a simple lack of individual technical skills. In aircraft maintenance operations, there is similar concern that maintenance errors which may lead to incidents and accidents are related to a large variety of human factors issues. Although maintenance error data and research are limited, industry initiatives involving human factors training in maintenance have become increasingly accepted as one type of maintenance error intervention. Conscientious efforts have been made in re-inventing the team7 concept for maintenance operations and in tailoring programs to fit the needs of technical opeRAtions. Nevertheless, there remains a dual challenge: 1) to develop human factors interventions which are directly supported by reliable human error data, and 2) to integrate human factors concepts into the procedures and practices of everyday technical tasks. In this paper, we describe several varieties of human factors interventions and focus on two specific alternatives which target problems related to procedures and practices; namely, 1) structured on-the-job training and 2) procedure re-design. We hope to demonstrate that the key to leveraging the impact of these solutions comes from focused interventions; that is, interventions which are derived from a clear understanding of specific maintenance errors, their operational context and human factors components.

  12. Deferred Maintenance Program Handbook.

    ERIC Educational Resources Information Center

    California State Dept. of General Services, Sacramento. Office of Public School Construction.

    This handbook provides process information on California's Deferred Maintenance Program, including a description of the administering body of law. Chapters discuss the program's process on the topics of basic/additional apportionment, fund release (basic/additional and critical hardship), the Deferred Maintenance Five-Year Plan, district deposit,…

  13. Artificial intelligence for turboprop engine maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-01-01

    Long-term maintenance operations, causing the unit to out of action, may seem economical - but they result in reduced operating readiness. Offsetting that concern, careless, hurried maintenance reduces margins of safety and reliability. Any tool that improves maintenance without causing a sharp increase in cost is valuable. Artificial intelligence (AI) is one of the tools. Expert system and neural networks are two different areas of AI that show promise for turboprop engine maintenance.

  14. [Point-of-care-testing--the intensive care laboratory].

    PubMed

    Müller, M M; Hackl, W; Griesmacher, A

    1999-01-01

    After successful centralization of laboratory analyses since more than 30 years, advances in biosensors, microprocessors, measurement of undiluted whole blood and miniaturization of laboratory analyzers are leading nowadays more and more to a re-decentralization in the laboratory medicine. Point-of-care-testing (POCT), which is defined as any laboratory test performed outside central or decentralized laboratories, is becoming more and more popular. The theoretical advantages of POCT are faster turn-around-times (TAT), more rapid medical decisions, avoidance of sample identification and sample transport problems and the need of only small specimen volumes. These advantages are frequently mentioned, but are not associated with a clear clinical benefit. The disadvantages of POCT such as incorrect handling and/or maintenance of the analyzers by nontrained clinical staff, inadequate or even absent calibrations and/or quality controls, lack of cost-effectiveness because of an increased number of analyzers and more expensive reagents, insufficient documentation and difficult comparability of the obtained POCT-results with routine laboratory results, are strongly evident. According to the authors' opinion the decision for the establishing of POCT has only to be made in a close co-operation between physicians and laboratorians in order to vouch for necessity and high quality of the analyses. Taking the local situation into consideration (24-h-central laboratory, etc.) the spectrum of parameters measured by means of POCT should be rigorously restricted to the vital functions. Such analytes should be: hemoglobin or hematocrit, activated whole blood clotting time, blood gases, sodium, potassium, ionized calcium, glucose, creatinine, ammonia and lactate.

  15. The laboratory of the 1990s—Planning for total automation

    PubMed Central

    Brunner, Linda A.

    1992-01-01

    The analytical laboratory of the 1990s must be able to meet and accommodate the rapid evolution of modern-day technology. One such area is laboratory automation. Total automation may be seen as the coupling of computerized sample tracking, electronic documentation and data reduction with automated sample handling, preparation and analysis, resulting in a complete analytical procedure with minimal human involvement. Requirements may vary from one laboratory or facility to another, so the automation has to be flexible enough to cover a wide range of applications, and yet fit into specific niches depending on individual needs. Total automation must be planned for, well in advance, if the endeavour is to be a success. Space, laboratory layout, proper equipment, and the availability and access to necessary utilities must be taken into account. Adequate training and experience of the personnel working with the technology must also be ensured. In addition, responsibilities of installation, programming maintenance and operation have to be addressed. Proper time management and the efficient implementation and use of total automation are also crucial to successful operations. This paper provides insights into laboratory organization and requirements, as well as discussing the management issues that must be faced when automating laboratory procedures. PMID:18924925

  16. Maximizing Hard Floor Maintenance.

    ERIC Educational Resources Information Center

    Steger, Michael

    2000-01-01

    Explains the maintenance options available for hardwood flooring that can help ensure long life cycles and provide inviting spaces. Developing a maintenance system, knowing the type of traffic that the floor must endure, using entrance matting, and adhering to manufacturers guidelines are discussed. Daily, monthly or quarterly, and long-term…

  17. Computerizing Maintenance Management Improves School Processes.

    ERIC Educational Resources Information Center

    Conroy, Pat

    2002-01-01

    Describes how a Computerized Maintenance Management System (CMMS), a centralized maintenance operations database that facilitates work order procedures and staff directives, can help individual school campuses and school districts to manage maintenance. Presents the benefits of CMMS and things to consider in CMMS selection. (EV)

  18. Practical biosafety in the tuberculosis laboratory: containment at the source is what truly counts.

    PubMed

    van Soolingen, D; Wisselink, H J; Lumb, R; Anthony, R; van der Zanden, A; Gilpin, C

    2014-08-01

    In industrialised countries, sufficient resources for establishing and maintaining fully equipped biosafety level 3 (BSL-3) laboratories according to international standards are generally available. BSL-3 laboratories are designed to provide several layers of containment to protect the laboratory worker as well as the outside environment and community from risk of exposure in case of local contamination. However, such facilities are scarce in high-burden settings, primarily due to the high financial burden and complexity of the initial construction and/or regular maintenance. Measures to prevent unintended exposure to Mycobacterium tuberculosis during laboratory manipulation of specimens and cultures is the first, and by far the most important, aspect of containment. This paper focuses on the need for risk containment at source. Assuming that in many settings the establishment of BSL-3 laboratories with all the required features is not achievable, this paper also discusses the minimum requirements necessary to mitigate risks associated with particular laboratory procedures. The term 'TB containment laboratory' is used throughout this paper to describe the minimum requirements for a laboratory suitable for high-risk procedures. The TB containment laboratory has many, but not all, of the features of a BSL-3 laboratory.

  19. 47 CFR 87.69 - Maintenance tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Maintenance tests. 87.69 Section 87.69... Operating Requirements and Procedures Operating Requirements § 87.69 Maintenance tests. The licensee may make routine maintenance tests on equipment other than emergency locator transmitters if there is no...

  20. The economics of satellite maintenance

    NASA Technical Reports Server (NTRS)

    Derocher, W. L., Jr.; Sosnay, R. G.

    1975-01-01

    The primary goal of the space transportation system - to reduce the cost of space programs while satisfying their mission requirements - can be enhanced by the proper choice of a satellite-maintenance concept. This paper develops the life-cycle costs of performing an automated satellite program during the shuttle era in three competitive modes: expendable, ground-refurbishable, and in-orbit maintainable. In-orbit maintenance is shown to be the most economic maintenance mode for both low- and high-earth orbits.

  1. Managing Highway Maintenance: Standards for Maintenance Work, Part 2, Unit 8, Level 2.

    ERIC Educational Resources Information Center

    Federal Highway Administration (DOT), Washington, DC. Offices of Research and Development.

    Part of the series "Managing Highway Maintenance," the unit describes the ways maintenance standards are developed and some of the factors which are considered in setting standards; the preceding unit on standards (part 1) should be completed before reading this unit. The format is a programed, self-instruction approach in which…

  2. Maintenance Staffing Guidelines For Educational Facilities.

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, Alexandria, VA.

    The purpose of this publication is to provide a resource or guide for educational facilities in establishing or developing a maintenance trades organization that is sufficient to accomplish basic facilities maintenance functions. The guidelines are intended to suggest staffing levels for those routine facilities maintenance activities that are…

  3. 14 CFR 145.217 - Contract maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Contract maintenance. 145.217 Section 145...) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.217 Contract maintenance. (a) A certificated repair station may contract a maintenance function pertaining to an article to an...

  4. Xenorhabdus bovienii Strain Diversity Impacts Coevolution and Symbiotic Maintenance with Steinernema spp. Nematode Hosts

    PubMed Central

    Murfin, Kristen E.; Lee, Ming-Min; McDonald, Bradon R.; Larget, Bret; Forst, Steven; Stock, S. Patricia; Currie, Cameron R.

    2015-01-01

    ABSTRACT Microbial symbionts provide benefits that contribute to the ecology and fitness of host plants and animals. Therefore, the evolutionary success of plants and animals fundamentally depends on long-term maintenance of beneficial associations. Most work investigating coevolution and symbiotic maintenance has focused on species-level associations, and studies are lacking that assess the impact of bacterial strain diversity on symbiotic associations within a coevolutionary framework. Here, we demonstrate that fitness in mutualism varies depending on bacterial strain identity, and this is consistent with variation shaping phylogenetic patterns and maintenance through fitness benefits. Through genome sequencing of nine bacterial symbiont strains and cophylogenetic analysis, we demonstrate diversity among Xenorhabdus bovienii bacteria. Further, we identified cocladogenesis between Steinernema feltiae nematode hosts and their corresponding X. bovienii symbiont strains, indicating potential specificity within the association. To test the specificity, we performed laboratory crosses of nematode hosts with native and nonnative symbiont strains, which revealed that combinations with the native bacterial symbiont and closely related strains performed significantly better than those with more divergent symbionts. Through genomic analyses we also defined potential factors contributing to specificity between nematode hosts and bacterial symbionts. These results suggest that strain-level diversity (e.g., subspecies-level differences) in microbial symbionts can drive variation in the success of host-microbe associations, and this suggests that these differences in symbiotic success could contribute to maintenance of the symbiosis over an evolutionary time scale. PMID:26045536

  5. Bioremediation of weathered petroleum hydrocarbon soil contamination in the Canadian High Arctic: laboratory and field studies.

    PubMed

    Sanscartier, David; Laing, Tamsin; Reimer, Ken; Zeeb, Barbara

    2009-11-01

    The bioremediation of weathered medium- to high-molecular weight petroleum hydrocarbons (HCs) in the High Arctic was investigated. The polar desert climate, contaminant characteristics, and logistical constraints can make bioremediation of persistent HCs in the High Arctic challenging. Landfarming (0.3 m(3) plots) was tested in the field for three consecutive years with plots receiving very little maintenance. Application of surfactant and fertilizers, and passive warming using a greenhouse were investigated. The field study was complemented by a laboratory experiment to better understand HC removal mechanisms and limiting factors affecting bioremediation on site. Significant reduction of total petroleum HCs (TPH) was observed in both experiments. Preferential removal of compounds laboratory. In the laboratory, significant removal of compounds >nC16 occurred, whereas in the field, TPH reduction was mainly limited to removal of compounds nC16 was observed in the fertilized field plots only. The greenhouse increased average soil temperatures and extended the treatment season but did not enhance bioremediation. Findings suggest that temperature and low moisture content affected biodegradation of HCs in the field. Little volatilization was measured in the laboratory, but this process may have been predominant in the field. Low-maintenance landfarming may be best suited for remediation of HCs compounds

  6. A probabilistic maintenance model for diesel engines

    NASA Astrophysics Data System (ADS)

    Pathirana, Shan; Abeygunawardane, Saranga Kumudu

    2018-02-01

    In this paper, a probabilistic maintenance model is developed for inspection based preventive maintenance of diesel engines based on the practical model concepts discussed in the literature. Developed model is solved using real data obtained from inspection and maintenance histories of diesel engines and experts' views. Reliability indices and costs were calculated for the present maintenance policy of diesel engines. A sensitivity analysis is conducted to observe the effect of inspection based preventive maintenance on the life cycle cost of diesel engines.

  7. 49 CFR 37.203 - Lift maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.203 Lift maintenance. (a) The entity shall establish a system of regular and frequent maintenance checks of lifts sufficient to determine if they are operative... 49 Transportation 1 2010-10-01 2010-10-01 false Lift maintenance. 37.203 Section 37.203...

  8. 49 CFR 37.203 - Lift maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Lift maintenance. 37.203 Section 37.203... DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.203 Lift maintenance. (a) The entity shall establish a system of regular and frequent maintenance checks of lifts sufficient to determine if they are operative...

  9. Managing Highway Maintenance: Standards for Maintenance Work, Part 3, Unit 8, Level 2.

    ERIC Educational Resources Information Center

    Federal Highway Administration (DOT), Washington, DC. Offices of Research and Development.

    Part of the series "Managing Highway Maintenance," the unit explains various uses of maintenance standards and how standards should be interpreted and communicated to formen and crew leaders. Several examples are given of the decisions made when applying the standards to routine work. The preceding units on standards (parts 1 and 2)…

  10. Maintenance of Mechanical Services. Maintenance and Renewal in Educational Buildings. Building Bulletin 70.

    ERIC Educational Resources Information Center

    Haworth-Roberts, A., Ed.

    School building maintenance must find an appropriate balance between planned and reactive work in order to conserve costs. This document provides ways in which authorities can assess their maintenance requirements and make better use of the resources available. It considers how to deal with problems which have their roots in historical design…

  11. Analyzing machine noise for real time maintenance

    NASA Astrophysics Data System (ADS)

    Yamato, Yoji; Fukumoto, Yoshifumi; Kumazaki, Hiroki

    2017-02-01

    Recently, IoT technologies have been progressed and applications of maintenance area are expected. However, IoT maintenance applications are not spread in Japan yet because of one-off solution of sensing and analyzing for each case, high cost to collect sensing data and insufficient maintenance automation. This paper proposes a maintenance platform which analyzes sound data in edges, analyzes only anomaly data in cloud and orders maintenance automatically to resolve existing technology problems. We also implement a sample application and compare related work.

  12. LANGUAGE LABORATORY FACILITIES, TECHNICAL GUIDE FOR THE SELECTION, PURCHASE, USE, AND MAINTENANCE, STUDY 4--NEW MEDIA FOR INSTRUCTION.

    ERIC Educational Resources Information Center

    HAYES, ALFRED S.

    THE MANY POSSIBLE VARIATIONS OF LANGUAGE LABORATORY SYSTEMS WERE DESCRIBED, AND RELATIVE ADVANTAGES AND LIMITATIONS OF EACH WERE DISCUSSED. DETAILED GUIDANCE ON PURCHASING LANGUAGE LABORATORY EQUIPMENT WAS PROVIDED THROUGH (1) DEFINITION OF HIGH-QUALITY SPEECH REPRODUCTION, (2) DISCUSSION OF TECHNICAL FACTORS WHICH AFFECT ITS ACHIEVEMENT, AND (3)…

  13. Data collection system. Volume 1, Overview and operators manual; Volume 2, Maintenance manual; Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Caudell, R.B.; Bauder, M.E.; Boyer, W.B.

    1993-09-01

    Sandia National Laboratories (SNL) Instrumentation Development Department was tasked by the Defense Nuclear Agency (DNA) to record data on Tektronix RTD720 Digitizers on the HUNTERS TROPHY field test conducted at the Nevada Test Site (NTS) on September 18, 1992. This report contains a overview and description of the computer hardware and software that was used to acquire, reduce, and display the data. The document is divided into two volumes: an overview and operators manual (Volume 1) and a maintenance manual (Volume 2).

  14. Buildings Lean Maintenance Implementation Model

    NASA Astrophysics Data System (ADS)

    Abreu, Antonio; Calado, João; Requeijo, José

    2016-11-01

    Nowadays, companies in global markets have to achieve high levels of performance and competitiveness to stay "alive".Within this assumption, the building maintenance cannot be done in a casual and improvised way due to the costs related. Starting with some discussion about lean management and building maintenance, this paper introduces a model to support the Lean Building Maintenance (LBM) approach. Finally based on a real case study from a Portuguese company, the benefits, challenges and difficulties are presented and discussed.

  15. Geometric database maintenance using CCTV cameras and overlay graphics

    NASA Astrophysics Data System (ADS)

    Oxenberg, Sheldon C.; Landell, B. Patrick; Kan, Edwin

    1988-01-01

    An interactive graphics system using closed circuit television (CCTV) cameras for remote verification and maintenance of a geometric world model database has been demonstrated in GE's telerobotics testbed. The database provides geometric models and locations of objects viewed by CCTV cameras and manipulated by telerobots. To update the database, an operator uses the interactive graphics system to superimpose a wireframe line drawing of an object with known dimensions on a live video scene containing that object. The methodology used is multipoint positioning to easily superimpose a wireframe graphic on the CCTV image of an object in the work scene. An enhanced version of GE's interactive graphics system will provide the object designation function for the operator control station of the Jet Propulsion Laboratory's telerobot demonstration system.

  16. The Application of the Human Engineering Modeling and Performance Laboratory for Space Vehicle Ground Processing Tasks at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Woodbury, Sarah K.

    2008-01-01

    The introduction of United Space Alliance's Human Engineering Modeling and Performance Laboratory began in early 2007 in an attempt to address the problematic workspace design issues that the Space Shuttle has imposed on technicians performing maintenance and inspection operations. The Space Shuttle was not expected to require the extensive maintenance it undergoes between flights. As a result, extensive, costly resources have been expended on workarounds and modifications to accommodate ground processing personnel. Consideration of basic human factors principles for design of maintenance is essential during the design phase of future space vehicles, facilities, and equipment. Simulation will be needed to test and validate designs before implementation.

  17. Prevalence of operator fatigue in winter maintenance operations.

    PubMed

    Camden, Matthew C; Medina-Flintsch, Alejandra; Hickman, Jeffrey S; Bryce, James; Flintsch, Gerardo; Hanowski, Richard J

    2018-02-02

    Similar to commercial motor vehicle drivers, winter maintenance operators are likely to be at an increased risk of becoming fatigued while driving due to long, inconsistent shifts, environmental stressors, and limited opportunities for sleep. Despite this risk, there is little research concerning the prevalence of winter maintenance operator fatigue during winter emergencies. The purpose of this research was to investigate the prevalence, sources, and countermeasures of fatigue in winter maintenance operations. Questionnaires from 1043 winter maintenance operators and 453 managers were received from 29 Clear Road member states. Results confirmed that fatigue was prevalent in winter maintenance operations. Over 70% of the operators and managers believed that fatigue has a moderate to significant impact on winter maintenance operations. Approximately 75% of winter maintenance operators reported to at least sometimes drive while fatigued, and 96% of managers believed their winter maintenance operators drove while fatigued at least some of the time. Furthermore, winter maintenance operators and managers identified fatigue countermeasures and sources of fatigue related to winter maintenance equipment. However, the countermeasures believed to be the most effective at reducing fatigue during winter emergencies (i.e., naps) were underutilized. For example, winter maintenance operators reported to never use naps to eliminate fatigue. These results indicated winter maintenance operations are impacted by operator fatigue. These results support the increased need for research and effective countermeasures targeting winter maintenance operator fatigue. Copyright © 2018 Elsevier Ltd. All rights reserved.

  18. Laboratory colonization and mass rearing of phlebotomine sand flies (Diptera, Psychodidae)

    PubMed Central

    Lawyer, Phillip; Killick-Kendrick, Mireille; Rowland, Tobin; Rowton, Edgar; Volf, Petr

    2017-01-01

    Laboratory colonies of phlebotomine sand flies are necessary for experimental study of their biology, behaviour and mutual relations with disease agents and for testing new methods of vector control. They are indispensable in genetic studies and controlled observations on the physiology and behaviour of sand flies, neglected subjects of high priority. Colonies are of particular value for screening insecticides. Colonized sand flies are used as live vector models in a diverse array of research projects, including xenodiagnosis, that are directed toward control of leishmaniasis and other sand fly-associated diseases. Historically, labour-intensive maintenance and low productivity have limited their usefulness for research, especially for species that do not adapt well to laboratory conditions. However, with growing interest in leishmaniasis research, rearing techniques have been developed and refined, and sand fly colonies have become more common, enabling many significant breakthroughs. Today, there are at least 90 colonies representing 21 distinct phlebotomine sand fly species in 35 laboratories in 18 countries worldwide. The materials and methods used by various sand fly workers differ, dictated by the availability of resources, cost or manpower constraints rather than choice. This paper is not intended as a comprehensive review but rather a discussion of methods and techniques most commonly used by researchers to initiate, establish and maintain sand fly colonies, with emphasis on the methods proven to be most effective for the species the authors have colonized. Topics discussed include collecting sand flies for colony stock, colony initiation, maintenance and mass-rearing procedures, and control of sand fly pathogens in colonies. PMID:29139377

  19. Preventive maintenance study : interim report.

    DOT National Transportation Integrated Search

    2017-09-01

    This interim report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill),...

  20. An experimental maintenance management system.

    DOT National Transportation Integrated Search

    1979-01-01

    The purpose of this study was to evaluate Virginia's maintenance management system and to recommend modifications directed at improving it. The study revealed that (1) the current system of allocating maintenance monies is based upon centerline milea...

  1. Maintenance energy requirement of llamas.

    PubMed

    Carmean, B R; Johnson, K A; Johnson, D E; Johnson, L W

    1992-09-01

    Five castrated male llamas (mean body weight, 94 kg) were studied in an energy balance trial to determine maintenance energy requirement of llamas. Llamas were fed a 50% oat hay-50% pelleted concentrate diet (2.43 Mcal of metabolizable energy/kg of diet dry matter) at approximately 1.6% of body weight (BW). An 8-day total collection digestion trial was used to determine fecal and urine energy losses. Heat production and methane emissions were determined via indirect respiration calorimetry measurements on each llama fed at the same level of intake as during the digestion trial and subsequently on days 3 and 4 of a period of nonfeeding. Fecal, urine, and methane energy losses of the llamas fed near-maintenance intake were 32.5, 3.5, and 7.1% of gross energy intake, respectively. The postabsorptive metabolic rate, commonly called nonfed (fasting) heat production, was 59.3 kcal/BW0.75. Using a linear relation between postabsorptive and maintenance energy requirement and efficiency of energy use below maintenance of 0.702, metabolizable energy requirement at maintenance was determined to be 84.5 kcal/BW0.75.

  2. Maintenance = reuse-oriented software development

    NASA Technical Reports Server (NTRS)

    Basili, Victor R.

    1989-01-01

    Maintenance is viewed as a reuse process. In this context, a set of models that can be used to support the maintenance process is discussed. A high level reuse framework is presented that characterizes the object of reuse, the process for adapting that object for its target application, and the reused object within its target application. Based upon this framework, a qualitative comparison is offered of the three maintenance process models with regard to their strengths and weaknesses and the circumstances in which they are appropriate. To provide a more systematic, quantitative approach for evaluating the appropriateness of the particular maintenance model, a measurement scheme is provided, based upon the reuse framework, in the form of an organized set of questions that need to be answered. To support the reuse perspective, a set of reuse enablers are discussed.

  3. Productivity of Veterans Health Administration laboratories: a College of American Pathologists Laboratory Management Index Program (LMIP) study.

    PubMed

    Valenstein, Paul N; Wang, Edward; O'Donohue, Tom

    2003-12-01

    The Veterans Health Administration (VA) operates the largest integrated laboratory network in the United States. To assess whether the unique characteristics of VA laboratories impact efficiency of operations, we compared the productivity of VA and non-VA facilities. Financial and activity data were prospectively collected from 124 VA and 131 non-VA laboratories enrolled in the College of American Pathologists Laboratory Management Index Program (LMIP) during 2002. In addition, secular trends in 5 productivity ratios were calculated for VA and non-VA laboratories enrolled in LMIP from 1997 through 2002. Veterans Health Administration and non-VA facilities did not differ significantly in size. Inpatients accounted for a lower percentage of testing at VA facilities than non-VA facilities (21.7% vs 37.3%; P <.001). Technical staff at the median VA facility were paid more than at non-VA facilities (28.11/h dollars vs 22.60/h dollars, salaries plus benefits; P <.001), VA laboratories employed a smaller percentage of nontechnical staff (30.0% vs 41.9%; P <.001), and workers at VA laboratories worked less time per hour paid (85.5% vs 88.5%; P <.001). However, labor productivity was significantly higher at VA than at non-VA facilities (30 448 test results/total full-time equivalent (FTE)/y vs 19 260 results/total FTE; P <.001), resulting in lower labor expense per on-site test at VA sites than at non-VA sites (1.79 dollars/result vs 2.08 dollars/result; P <.001). Veterans Health Administration laboratories paid less per test for consumables (P =.003), depreciation, and maintenance than their non-VA counterparts (all P <.001), resulting in lower overall cost per on-site test result (2.64 dollars vs 3.40 dollars; P <.001). Cost per referred (sent-out) test did not differ significantly between the 2 groups. Analysis of 6-year trends showed significant increases in both VA (P <.001) and non-VA (P =.02) labor productivity (on-site tests/total FTE). Expenses at VA laboratories

  4. 14 CFR 43.3 - Persons authorized to perform maintenance, preventive maintenance, rebuilding, and alterations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... maintenance are a result of a known or suspected mechanical difficulty or malfunction that occurred en route... is authorized in writing by the certificate holder for each item of preventive maintenance that the... satisfactorily completed an approved training program and is authorized in writing by the certificate holder to...

  5. Recent Research on Language Maintenance.

    ERIC Educational Resources Information Center

    Garcia, MaryEllen

    2003-01-01

    Describes recent research on language maintenance to provide broad, worldwide coverage of different language contact situations. Surveys various countries in which research within ethnic and minority language communities illuminates language maintenance or shift, or revitalization, for that group. (Author/VWL)

  6. Customized laboratory information management system for a clinical and research leukemia cytogenetics laboratory.

    PubMed

    Bakshi, Sonal R; Shukla, Shilin N; Shah, Pankaj M

    2009-01-01

    We developed a Microsoft Access-based laboratory management system to facilitate database management of leukemia patients referred for cytogenetic tests in regards to karyotyping and fluorescence in situ hybridization (FISH). The database is custom-made for entry of patient data, clinical details, sample details, cytogenetics test results, and data mining for various ongoing research areas. A number of clinical research laboratoryrelated tasks are carried out faster using specific "queries." The tasks include tracking clinical progression of a particular patient for multiple visits, treatment response, morphological and cytogenetics response, survival time, automatic grouping of patient inclusion criteria in a research project, tracking various processing steps of samples, turn-around time, and revenue generated. Since 2005 we have collected of over 5,000 samples. The database is easily updated and is being adapted for various data maintenance and mining needs.

  7. Managing Highway Maintenance: Maintenance Activities, Work Units, and Classifying Work, Unit 6, Level 2.

    ERIC Educational Resources Information Center

    Federal Highway Administration (DOT), Washington, DC. Offices of Research and Development.

    Part of the series "Managing Highway Maintenance," the unit explains how maintenance work should be described, measured, and classified. It is designed for supervisors who need to know the mechanics of describing work. The format is a programed, self-instruction approach in which information is presented in progressive segments or…

  8. 40 CFR 610.52 - Maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a) Maintenance during the durability evaluation can best be considered in three separate categories: (1) Normal... durability evaluation in this program will probably have considerable mileage accumulation and unknown...

  9. 50 CFR 80.17 - Maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS § 80.17 Maintenance. The State is responsible for maintenance of all capital improvements acquired or constructed with Wildlife and Sport Fish...

  10. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  11. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, Valerie A.; Ogilvie, Alistair B.

    2012-01-01

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis frommore » a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.« less

  12. Maintenance Deferred.

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2000-01-01

    Discusses how colleges and universities are scrambling to catch up on deferred maintenance before the backlog becomes overwhelming. The problems, and some solutions, for acquiring repair funding and collecting needs data are addressed. (GR)

  13. Rituximab maintenance for relapsed refractory thrombotic thrombocytopenic purpura.

    PubMed

    Bhagirath, Vinai C; Kelton, John G; Moore, Jane; Arnold, Donald M

    2012-12-01

    Rituximab, an anti-CD20 chimeric monoclonal antibody, has been used successfully to treat patients with relapsed or refractory thrombotic thrombocytopenic purpura (TTP); however, the optimal dose and frequency and the role of rituximab maintenance remain uncertain. We describe a 45-year-old woman with chronic relapsing immune thrombocytopenia who responded to rituximab retreatment administered in four doses over the course of 12 months. Previously, she had received four doses of rituximab and sustained a remission for 19 months. During her latest TTP relapse, multiple treatments were administered including rituximab retreatment. After the first dose (375 mg/m2), she developed serum sickness requiring further doses to be deferred. Three subsequent doses were administered at 4-month intervals over the course of 12 months. ADAMTS13 activity was measured by von Willebrand factor (VWF) digestion. ADAMTS13 inhibition was measured by a modification of the VWF digestion assay and anti-ADAMTS13 antibodies were measured by enzyme-linked immunoassay (enzyme-linked immunosorbent assay, American Diagnostica). Clinical and laboratory remission were achieved after one dose of rituximab, with normalization of ADAMTS13 activity and disappearance of ADAMTS13 inhibitor. Three subsequent doses of rituximab were given without incident and the patient remained in remission after 3.5 years of follow-up (2.5 years since her last dose of rituximab). Maintenance dosing of rituximab should be considered in some patients with relapsing TTP. © 2012 American Association of Blood Banks.

  14. Which factors affect software projects maintenance cost more?

    PubMed

    Dehaghani, Sayed Mehdi Hejazi; Hajrahimi, Nafiseh

    2013-03-01

    The software industry has had significant progress in recent years. The entire life of software includes two phases: production and maintenance. Software maintenance cost is increasingly growing and estimates showed that about 90% of software life cost is related to its maintenance phase. Extraction and considering the factors affecting the software maintenance cost help to estimate the cost and reduce it by controlling the factors. In this study, the factors affecting software maintenance cost were determined then were ranked based on their priority and after that effective ways to reduce the maintenance costs were presented. This paper is a research study. 15 software related to health care centers information systems in Isfahan University of Medical Sciences and hospitals function were studied in the years 2010 to 2011. Among Medical software maintenance team members, 40 were selected as sample. After interviews with experts in this field, factors affecting maintenance cost were determined. In order to prioritize the factors derived by AHP, at first, measurement criteria (factors found) were appointed by members of the maintenance team and eventually were prioritized with the help of EC software. Based on the results of this study, 32 factors were obtained which were classified in six groups. "Project" was ranked the most effective feature in maintenance cost with the highest priority. By taking into account some major elements like careful feasibility of IT projects, full documentation and accompany the designers in the maintenance phase good results can be achieved to reduce maintenance costs and increase longevity of the software.

  15. Landscaping With Maintenance in Mind.

    ERIC Educational Resources Information Center

    Sorensen, Randy

    2000-01-01

    Examines school ground landscape design that enhances attractive of the school and provides for easier maintenance. Landscape design issues discussed include choice of grass, trees, and shrubs; irrigation; and safety and access. Other considerations for lessening maintenance problems for facility managers are also highlighted. (GR)

  16. 40 CFR 610.52 - Maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Maintenance. 610.52 Section 610.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a...

  17. 40 CFR 610.52 - Maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Maintenance. 610.52 Section 610.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a...

  18. 40 CFR 610.52 - Maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Maintenance. 610.52 Section 610.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a...

  19. 40 CFR 610.52 - Maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Maintenance. 610.52 Section 610.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a...

  20. Stepwise approach to establishing multiple outreach laboratory information system-electronic medical record interfaces.

    PubMed

    Pantanowitz, Liron; Labranche, Wayne; Lareau, William

    2010-05-26

    Clinical laboratory outreach business is changing as more physician practices adopt an electronic medical record (EMR). Physician connectivity with the laboratory information system (LIS) is consequently becoming more important. However, there are no reports available to assist the informatician with establishing and maintaining outreach LIS-EMR connectivity. A four-stage scheme is presented that was successfully employed to establish unidirectional and bidirectional interfaces with multiple physician EMRs. This approach involves planning (step 1), followed by interface building (step 2) with subsequent testing (step 3), and finally ongoing maintenance (step 4). The role of organized project management, software as a service (SAAS), and alternate solutions for outreach connectivity are discussed.

  1. Stepwise approach to establishing multiple outreach laboratory information system-electronic medical record interfaces

    PubMed Central

    Pantanowitz, Liron; LaBranche, Wayne; Lareau, William

    2010-01-01

    Clinical laboratory outreach business is changing as more physician practices adopt an electronic medical record (EMR). Physician connectivity with the laboratory information system (LIS) is consequently becoming more important. However, there are no reports available to assist the informatician with establishing and maintaining outreach LIS–EMR connectivity. A four-stage scheme is presented that was successfully employed to establish unidirectional and bidirectional interfaces with multiple physician EMRs. This approach involves planning (step 1), followed by interface building (step 2) with subsequent testing (step 3), and finally ongoing maintenance (step 4). The role of organized project management, software as a service (SAAS), and alternate solutions for outreach connectivity are discussed. PMID:20805958

  2. Tiger Team Assessment of the Los Alamos National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-11-01

    The purpose of the safety and health assessment was to determine the effectiveness of representative safety and health programs at the Los Alamos National Laboratory (LANL). Within the safety and health programs at LANL, performance was assessed in the following technical areas: Organization and Administration, Quality Verification, Operations, Maintenance, Training and Certification, Auxiliary Systems, Emergency Preparedness, Technical Support, Packaging and Transportation, Nuclear Criticality Safety, Security/Safety Interface, Experimental Activities, Site/Facility Safety Review, Radiological Protection, Personnel Protection, Worker Safety and Health (OSHA) Compliance, Fire Protection, Aviation Safety, Explosives Safety, Natural Phenomena, and Medical Services.

  3. 36 CFR 212.4 - Construction and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Construction and maintenance... TRAVEL MANAGEMENT Administration of the Forest Transportation System § 212.4 Construction and maintenance. (a) Construction and maintenance work on forest transportation facilities with appropriated funds...

  4. 14 CFR 121.123 - Servicing maintenance facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Servicing maintenance facilities. 121.123 Section 121.123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION..., supplies, and materials) are available for the proper servicing, maintenance, and preventive maintenance of...

  5. 14 CFR 121.123 - Servicing maintenance facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Servicing maintenance facilities. 121.123 Section 121.123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION..., supplies, and materials) are available for the proper servicing, maintenance, and preventive maintenance of...

  6. 14 CFR 121.123 - Servicing maintenance facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Servicing maintenance facilities. 121.123 Section 121.123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION..., supplies, and materials) are available for the proper servicing, maintenance, and preventive maintenance of...

  7. 14 CFR 121.123 - Servicing maintenance facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Servicing maintenance facilities. 121.123 Section 121.123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION..., supplies, and materials) are available for the proper servicing, maintenance, and preventive maintenance of...

  8. The Imperatives of Tactical Level Maintenance,

    DTIC Science & Technology

    1986-11-24

    consist of the imperatives of tactical level maintenance. These imperatives are: fix forward; provision of repair parts supply in a responsive manner...Fix forward; Provide rer,onsi,,e repair parts supply support; Conduct responsive recoer’, and e,)acuat!Dr operations; Establish and maintain...1 primary battlefield source of supple becomes the maintenance system. The role of maintenance, therefore, is to ass-ist in tne pro ’,51 _n

  9. Integration of infrared thermography into various maintenance methodologies

    NASA Astrophysics Data System (ADS)

    Morgan, William T.

    1993-04-01

    Maintenance methodologies are in developmental stages throughout the world as global competitiveness drives all industries to improve operational efficiencies. Rapid progress in technical advancements has added an additional strain on maintenance organizations to progressively change. Accompanying needs for advanced training and documentation is the demand for utilization of various analytical instruments and quantitative methods. Infrared thermography is one of the primary elements of engineered approaches to maintenance. Current maintenance methodologies can be divided into six categories; Routine ('Breakdown'), Preventive, Predictive, Proactive, Reliability-Based, and Total Productive (TPM) maintenance. Each of these methodologies have distinctive approaches to achieving improved operational efficiencies. Popular though is that infrared thermography is a Predictive maintenance tool. While this is true, it is also true that it can be effectively integrated into each of the maintenance methodologies for achieving desired results. The six maintenance strategies will be defined. Infrared applications integrated into each will be composed in tabular form.

  10. Health maintenance facility system effectiveness testing

    NASA Technical Reports Server (NTRS)

    Lloyd, Charles W.; Gosbee, John; Bueker, Richard; Kupra, Debra; Ruta, Mary

    1993-01-01

    The Medical Simulations Working Group conducted a series of medical simulations to evaluate the proposed Health Maintenance Facility (HMF) Preliminary Design Review (PDR) configuration. The goal of these simulations was to test the system effectiveness of the HMF PDR configurations. The objectives of the medical simulations are to (1) ensure fulfillment of requirements with this HMF design, (2) demonstrate the conformance of the system to human engineering design criteria, and (3) determine whether undesirable design or procedural features were introduced into the design. The simulations consisted of performing 6 different medical scenarios with the HMF mockup in the KRUG laboratory. The scenarios included representative medical procedures and used a broad spectrum of HMF equipment and supplies. Scripts were written and simulations performed by medical simulations working group members under observation from others. Data were collected by means of questionnaires, debriefings, and videotapes. Results were extracted and listed in the individual reports. Specific issues and recommendations from each simulation were compiled into the individual reports. General issues regarding the PDR design of the HMF are outlined in the summary report.

  11. 14 CFR 91.421 - Rebuilt engine maintenance records.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Rebuilt engine maintenance records. 91.421..., Preventive Maintenance, and Alterations § 91.421 Rebuilt engine maintenance records. (a) The owner or operator may use a new maintenance record, without previous operating history, for an aircraft engine...

  12. 14 CFR 91.421 - Rebuilt engine maintenance records.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Rebuilt engine maintenance records. 91.421..., Preventive Maintenance, and Alterations § 91.421 Rebuilt engine maintenance records. (a) The owner or operator may use a new maintenance record, without previous operating history, for an aircraft engine...

  13. Using Modern Methodologies with Maintenance Software

    NASA Technical Reports Server (NTRS)

    Streiffert, Barbara A.; Francis, Laurie K.; Smith, Benjamin D.

    2014-01-01

    Jet Propulsion Laboratory uses multi-mission software produced by the Mission Planning and Sequencing (MPS) team to process, simulate, translate, and package the commands that are sent to a spacecraft. MPS works under the auspices of the Multi-Mission Ground Systems and Services (MGSS). This software consists of nineteen applications that are in maintenance. The MPS software is classified as either class B (mission critical) or class C (mission important). The scheduling of tasks is difficult because mission needs must be addressed prior to performing any other tasks and those needs often spring up unexpectedly. Keeping track of the tasks that everyone is working on is also difficult because each person is working on a different software component. Recently the group adopted the Scrum methodology for planning and scheduling tasks. Scrum is one of the newer methodologies typically used in agile development. In the Scrum development environment, teams pick their tasks that are to be completed within a sprint based on priority. The team specifies the sprint length usually a month or less. Scrum is typically used for new development of one application. In the Scrum methodology there is a scrum master who is a facilitator who tries to make sure that everything moves smoothly, a product owner who represents the user(s) of the software and the team. MPS is not the traditional environment for the Scrum methodology. MPS has many software applications in maintenance, team members who are working on disparate applications, many users, and is interruptible based on mission needs, issues and requirements. In order to use scrum, the methodology needed adaptation to MPS. Scrum was chosen because it is adaptable. This paper is about the development of the process for using scrum, a new development methodology, with a team that works on disparate interruptible tasks on multiple software applications.

  14. 25 CFR 170.812 - What is emergency maintenance?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is emergency maintenance? 170.812 Section 170.812 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.812 What is emergency maintenance? Emergency maintenance is work that...

  15. 25 CFR 170.812 - What is emergency maintenance?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false What is emergency maintenance? 170.812 Section 170.812 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.812 What is emergency maintenance? Emergency maintenance is work that...

  16. A study of electro-mechanical and infrastructure instrumentation facilities in environmental laboratory.

    PubMed

    Dhawangale, R M; Kawale, S M; Waghmare, Maya; Pandya, G H; Kondawar, V K

    2006-01-01

    Environmental laboratories carry out measurement and analysis of a number of physical, chemical and biological parameters. Each parameter requires some sort of instrument for its determination. Providing efficient instrumentation services to various departments of the Institute is an stupendous task. Instrumentation services in the form of installation, operation, repair and maintenanace of electro-mechanical equipment requires an in-depth experience and knowledge of the working, fabrication, design and repair of similar type of instruments so that the need of space, installation pre-requisites, budget constraints, availability of essential spares parts could be assessed. The paper discusses the operation of an environmental instrument repairs and maintenance, and audio-visual facilities. Suggestions for drafting of the proper specifications for procurement of laboratory equipments, such as ovens, furnaces, refrigerators, blowers, audio visual aids, and spares and accessories are given in this paper. The paper also gives the detailed information on various aspects that are needed for checking and testing of the equipment against specification before putting it in operational use. Development of a preventive maintenance program involving QC checks and keeping an inventory of essential spares required are also discussed in this paper. It is felt that such services are essential in providing smooth support to carry out research and development activities of the Institute.

  17. 23 CFR 1.27 - Maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Maintenance. 1.27 Section 1.27 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GENERAL MANAGEMENT AND ADMINISTRATION GENERAL § 1.27 Maintenance. The responsibility imposed upon the State highway department, pursuant to 23 U.S.C. 116, for the...

  18. 23 CFR 1.27 - Maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Maintenance. 1.27 Section 1.27 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GENERAL MANAGEMENT AND ADMINISTRATION GENERAL § 1.27 Maintenance. The responsibility imposed upon the State highway department, pursuant to 23 U.S.C. 116, for the...

  19. 23 CFR 1.27 - Maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Maintenance. 1.27 Section 1.27 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GENERAL MANAGEMENT AND ADMINISTRATION GENERAL § 1.27 Maintenance. The responsibility imposed upon the State highway department, pursuant to 23 U.S.C. 116, for the...

  20. Research on large equipment maintenance system in life cycle

    NASA Astrophysics Data System (ADS)

    Xu, Xiaowei; Wang, Hongxia; Liu, Zhenxing; Zhang, Nan

    2017-06-01

    In order to change the current disadvantages of traditional large equipment maintenance concept, this article plans to apply the technical method of prognostics and health management to optimize equipment maintenance strategy and develop large equipment maintenance system. Combined with the maintenance procedures of various phases in life cycle, it concluded the formulation methods of maintenance program and implement plans of maintenance work. In the meantime, it takes account into the example of the dredger power system of the Waterway Bureau to establish the auxiliary platform of ship maintenance system in life cycle.

  1. FAA Certificated Maintenance Agencies Directory (1997)

    DOT National Transportation Integrated Search

    1997-05-06

    This advisory circular (AC) transmits a consolidated directory of all : certificated Federal Aviation Administration (FAA) repair stations and : manufacturer's maintenance facilities. The repair stations and manufacturer's : maintenance facilities we...

  2. 14 CFR 147.38 - Maintenance of curriculum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS Operating Rules § 147.38 Maintenance of curriculum requirements. (a) Each certificated aviation maintenance technician...

  3. Resurgence: The Unintended Maintenance of Problem Behavior

    ERIC Educational Resources Information Center

    Ringdahl, Joel E.; St. Peter, Claire

    2017-01-01

    Researchers, teachers, practitioners, and parents are often concerned with how to program for and achieve the maintenance of appropriate behavior. The unintended maintenance of problem behavior is less often evaluated. This article describes a behavioral phenomenon, resurgence, that may result in the unintended maintenance of problem behavior.…

  4. 49 CFR 214.341 - Roadway maintenance machines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Roadway maintenance machines. 214.341 Section 214... Roadway maintenance machines. (a) Each employer shall include in its on-track safety program specific provisions for the safety of roadway workers who operate or work near roadway maintenance machines. Those...

  5. 32 CFR 174.14 - Maintenance and repair.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and protect those facilities and items of equipment needed for reuse in an economical manner that... consultation with the LRA, will establish initial levels of maintenance and repair needed to aid redevelopment... levels of maintenance and repair and its duration. In no case will these initial levels of maintenance...

  6. 32 CFR 174.14 - Maintenance and repair.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and protect those facilities and items of equipment needed for reuse in an economical manner that... consultation with the LRA, will establish initial levels of maintenance and repair needed to aid redevelopment... levels of maintenance and repair and its duration. In no case will these initial levels of maintenance...

  7. 40 CFR 63.105 - Maintenance wastewater requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Maintenance wastewater requirements... Manufacturing Industry § 63.105 Maintenance wastewater requirements. (a) Each owner or operator of a source... for maintenance wastewaters containing those organic HAP's listed in table 9 of subpart G of this part...

  8. 21 CFR 211.58 - Maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 4 2012-04-01 2012-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall be...

  9. 21 CFR 211.58 - Maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 4 2013-04-01 2013-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall be...

  10. 21 CFR 211.58 - Maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall be...

  11. 21 CFR 211.58 - Maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 4 2014-04-01 2014-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall be...

  12. 21 CFR 211.58 - Maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 4 2011-04-01 2011-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall be...

  13. 75 FR 37457 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-54] Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional Classification and Wage Rate AGENCY: Office of... requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as...

  14. 75 FR 4099 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-06] Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional Classification and Wage Rate AGENCY: Office of... requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as...

  15. Understanding the effects of decompaction maintenance on the infill state and play performance of third-generation artificial grass pitches

    PubMed Central

    Forrester, Stephanie E; McLaren, Nicholas J

    2015-01-01

    Third generation artificial grass pitches have been observed to get harder over time. The maintenance technique of rubber infill decompaction is intended to help slow, or reverse, this process. At present, little is understood about either the science of the infill compaction process or the efficacy of decompaction maintenance. The objective of this study was to measure the changes in rubber infill net bulk density, force reduction (impact absorption) and vertical ball rebound under various levels of compactive effort in controlled laboratory-based testing. The assessments were repeated after the systems had been raked to simulate the decompaction maintenance techniques. These tests defined the limits of compaction (loose to maximally compacted) in terms of the change in rubber infill net bulk density, force reduction and vertical ball rebound. Site testing was also undertaken at four third generation pitches immediately pre and post decompaction, to determine the measurable effects in the less well controlled field environment. Rubber infill net bulk density was found to increase as compactive effort increased, resulting in increased hardness. Decompacting the surface was found to approximately fully reverse these effects. In comparison, the site measurements demonstrated similar but notably smaller magnitudes of change following the decompaction process suggesting that the field state pre and post decompaction did not reach the extremes obtained in the laboratory. The findings suggest that rubber infill net bulk density is an important parameter influencing the hardness of artificial grass and that decompactions can be an effective method to reverse compaction related hardness changes. PMID:29708108

  16. Combat Maintenance Concepts and Repair Techniques Using Shape Memory Alloys for Fluid Lines, Control Tubes, and Drive Shafts.

    DTIC Science & Technology

    1983-03-01

    BUREAU OF STANDARDS-1963-A ,,...:-. .-. -.’" :.- --. . 4 Iq " USAAVRADCOM-TR-82-D-37 COMBAT MAINTENANCE CONCEPTS AND REPAIR TECHNIQUES USING SHAPE MEMORY...O APPLIED TECHNOLOGY LABORATORY POSITION STATEMENT The results of this effort determined the feasibility of using the full-ring shape memory alloy...specifications, or other data are used for any purpose other than in connection with a definitely related Government procurement operation, the United

  17. Cognitive Load and Maintenance Rehearsal.

    ERIC Educational Resources Information Center

    Naveh-Benjamin, Moshe; and Jonides, John

    1984-01-01

    Studies the much-debated issue of the role of rote, repetitive rehearsal (maintenance rehearsal) on the establishment of memory traces that outlast the rehearsal process itself. Results show that there is an effect of maintenance rehearsal on long-term recognition performance and that this effect depends on the mental resources devoted to the…

  18. Reliability Centered Maintenance - Methodologies

    NASA Technical Reports Server (NTRS)

    Kammerer, Catherine C.

    2009-01-01

    Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

  19. [Development of Hospital Equipment Maintenance Information System].

    PubMed

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  20. 46 CFR 122.704 - Maintenance of falls.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Maintenance of falls. 122.704 Section 122.704 Shipping..., Maintenance, and Inspection of Lifesaving Equipment § 122.704 Maintenance of falls. (a) Each fall used in a... fall must be renewed when necessary due to deterioration or at internals of not more than 5 years...

  1. 46 CFR 122.704 - Maintenance of falls.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Maintenance of falls. 122.704 Section 122.704 Shipping..., Maintenance, and Inspection of Lifesaving Equipment § 122.704 Maintenance of falls. (a) Each fall used in a... fall must be renewed when necessary due to deterioration or at internals of not more than 5 years...

  2. 46 CFR 122.704 - Maintenance of falls.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Maintenance of falls. 122.704 Section 122.704 Shipping..., Maintenance, and Inspection of Lifesaving Equipment § 122.704 Maintenance of falls. (a) Each fall used in a... fall must be renewed when necessary due to deterioration or at internals of not more than 5 years...

  3. 46 CFR 122.704 - Maintenance of falls.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Maintenance of falls. 122.704 Section 122.704 Shipping..., Maintenance, and Inspection of Lifesaving Equipment § 122.704 Maintenance of falls. (a) Each fall used in a... fall must be renewed when necessary due to deterioration or at internals of not more than 5 years...

  4. 46 CFR 122.704 - Maintenance of falls.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Maintenance of falls. 122.704 Section 122.704 Shipping..., Maintenance, and Inspection of Lifesaving Equipment § 122.704 Maintenance of falls. (a) Each fall used in a... fall must be renewed when necessary due to deterioration or at internals of not more than 5 years...

  5. The handling, hazards, and maintenance of heavy liquids in the geologic laboratory

    USGS Publications Warehouse

    Hauff, Phoebe L.; Airey, Joseph

    1980-01-01

    In geologic laboratories the organic heavy liquids bromoform, methylene iodide, tetrabromoethane, and clerici compounds have been used for years in mineral separation processes. Because the volume of use of these compounds is low, insufficient data is available on their toxic properties. This report is an attempt to summarize the known data from published and industry sources. The physical properties, hazards of handling,proper storage facilities, and adequate protective Clothing are discussed for each compound as well as for their common and less-common solvents. Toxicity data for these materials is listed along with exposure symptoms and suggested first aid treatments. Safety for the worker is emphasized. Three reclamation methods which recover the solvent used as a dilutant and purify the heavy liquid are discussed and illustrated. These include: the water cascade, re fluxing-distillation-condensation, and flash evaporation methods. Various techniques for restoration and stabilization of these heavy liquids are also included.

  6. Critical role of developing national strategic plans as a guide to strengthen laboratory health systems in resource-poor settings.

    PubMed

    Nkengasong, John N; Mesele, Tsehaynesh; Orloff, Sherry; Kebede, Yenew; Fonjungo, Peter N; Timperi, Ralph; Birx, Deborah

    2009-06-01

    Medical laboratory services are an essential, yet often neglected, component of health systems in developing countries. Their central role in public health, disease control and surveillance, and patient management is often poorly recognized by governments and donors. However, medical laboratory services in developing countries can be strengthened by leveraging funding from other sources of HIV/AIDS prevention, care, surveillance, and treatment programs. Strengthening these services will require coordinated efforts by national governments and partners and can be achieved by establishing and implementing national laboratory strategic plans and policies that integrate laboratory systems to combat major infectious diseases. These plans should take into account policy, legal, and regulatory frameworks; the administrative and technical management structure of the laboratories; human resources and retention strategies; laboratory quality management systems; monitoring and evaluation systems; procurement and maintenance of equipment; and laboratory infrastructure enhancement. Several countries have developed or are in the process of developing their laboratory plans, and others, such as Ethiopia, have implemented and evaluated their plan.

  7. 14 CFR 43.17 - Maintenance, preventive maintenance, and alterations performed on U.S. aeronautical products by...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... maintenance, or alteration is performed in accordance with a Bilateral Aviation Safety Agreement between the... recorded in accordance with a Bilateral Aviation Safety Agreement between the United States and Canada and... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT MAINTENANCE...

  8. Operation and maintenance cost-cutting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hollingshead, T.W.

    This presentation by Timothy W. Hollingshead, Technical Services Manager, Pacific Gas and Electric, is about cutting costs in the Operation and Maintenance phase of geothermal energy production. The necessity of cost control, keeping workers well-trained and avoiding OSHA fines, taking advantages of new technologies, and establishing predictive maintenance programs are some of the issues discussed in this article.

  9. Human Factors in Aviation Maintenance. Phase 1

    DTIC Science & Technology

    1991-11-01

    Aircraft Maintenance Information SystemSupyyse AMP ......... Aircraft Maintenance Personnel CRM ....... Cockpit Resource Management AMT... developments were sponsored by the Department of interchange of relevant information between system par- Defense (DoD). Fewer than twenty systems are...ofindividuals without complicating lines ofcommand andothers in the maintenance system is repeated for row "I." orthe allocation ofresponsibility

  10. Course Outline for Lesson Plans for Pre-Employment Laboratory Training in CVAE-VEH Farm and Ranch Mechanical Repair.

    ERIC Educational Resources Information Center

    Texas A and M Univ., College Station. Vocational Instructional Services.

    This packet contains 88 lesson plans for a laboratory course in farm and ranch mechanical repair. The lesson plans are organized into six units covering the following topics: occupational information, construction and maintenance (safety, farm carpentry, farm water supply and sanitation, farm electricity, concrete), hot metal work (oxyacetylene…

  11. Computer validation in toxicology: historical review for FDA and EPA good laboratory practice.

    PubMed

    Brodish, D L

    1998-01-01

    The application of computer validation principles to Good Laboratory Practice is a fairly recent phenomenon. As automated data collection systems have become more common in toxicology facilities, the U.S. Food and Drug Administration and the U.S. Environmental Protection Agency have begun to focus inspections in this area. This historical review documents the development of regulatory guidance on computer validation in toxicology over the past several decades. An overview of the components of a computer life cycle is presented, including the development of systems descriptions, validation plans, validation testing, system maintenance, SOPs, change control, security considerations, and system retirement. Examples are provided for implementation of computer validation principles on laboratory computer systems in a toxicology facility.

  12. 49 CFR 193.2605 - Maintenance procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2605 Maintenance procedures. (a) Each operator shall determine...

  13. 49 CFR 193.2605 - Maintenance procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2605 Maintenance procedures. (a) Each operator shall determine...

  14. Survey of transit bus maintenance programs in Virginia.

    DOT National Transportation Integrated Search

    1981-01-01

    Transit bus maintenance practices as used by thirteen small and medium-sized transit systems in Virginia were cataloged. Different approaches to maintenance were investigated and the current condition of transit bus maintenance was determined. Factor...

  15. Epidemiological, clinical and sleep laboratory evaluations of insomnia

    NASA Technical Reports Server (NTRS)

    Bixler, E. O.; Kales, A.; Kales, J. D.

    1975-01-01

    Epidemiological studies have contributed to the understanding of the total scope of the insomnia problem, both in terms of the incidence of sleep difficulties, and the extent and frequency of hypnotic drug use. Clinical studies - at the Sleep Research and Treatment Center - have been used to evaluate the medical, psychological, pharmacological and situational factors contributing to insomnia, and to evaluate the psychotherapy and chemotherapy best suited to treatment of insomnia. The sleep laboratory studies were of two types: (1) the study of sleep induction, sleep maintenance, and sleep stages, and (2) the use of hypnotic drugs, emphasizing their effectiveness in inducing and maintaining sleep, and the duration of this effectiveness.

  16. Qualitative Analysis for Maintenance Process Assessment

    NASA Technical Reports Server (NTRS)

    Brand, Lionel; Kim, Yong-Mi; Melo, Walcelio; Seaman, Carolyn; Basili, Victor

    1996-01-01

    In order to improve software maintenance processes, we first need to be able to characterize and assess them. These tasks must be performed in depth and with objectivity since the problems are complex. One approach is to set up a measurement-based software process improvement program specifically aimed at maintenance. However, establishing a measurement program requires that one understands the problems to be addressed by the measurement program and is able to characterize the maintenance environment and processes in order to collect suitable and cost-effective data. Also, enacting such a program and getting usable data sets takes time. A short term substitute is therefore needed. We propose in this paper a characterization process aimed specifically at maintenance and based on a general qualitative analysis methodology. This process is rigorously defined in order to be repeatable and usable by people who are not acquainted with such analysis procedures. A basic feature of our approach is that actual implemented software changes are analyzed in order to understand the flaws in the maintenance process. Guidelines are provided and a case study is shown that demonstrates the usefulness of the approach.

  17. Aircraft Maintenance Engineering: Factors Impacting Airlines E-Maintenance Technologies, Authoring and Illustrations

    NASA Astrophysics Data System (ADS)

    Karayianes, Frank

    The purpose of this research was to evaluate factors influencing acceptance and use of technologies in the field of aircraft maintenance authoring, graphics, and documentation. Maintenance engineering authors convert complex engineering used in aircraft production and transform that data using technology (tools) into usable technical publications data. While the current literature includes a large volume of research in technology acceptance in various domains of industry and business, the problem is that no such studies exist with respect to the aircraft maintenance engineering authoring, allowing any number of tools to be used and acceptance to be unsure. The study was based on theoretical approaches of the Technology Acceptance Model and the associated hypothesis related to eight research questions. A survey questionnaire was developed for data collection from a selected population of aircraft maintenance engineering authors. Data collected from 148 responses were exposed to a range of statistical methods and analyses. Analysis of data were performed within the structural equation model using exploratory factor analysis, confirmatory factor analysis, and a range of regression methods. The analyses generally provided results consistent with prior literature. Two survey questions yielded unexpected results contrary to similar studies. The relationship between prior experience and job level did not show a significant relationship with perceived usefulness or perceived ease of use. Other results included the significant relationship between Perceived Usefulness and Perceived Ease of Use with Technology acceptance. Recommendations include understanding how Technology Acceptance can be improved for the industry and the need for further research not covered to refine recommendations for technology acceptance related to the aviation industry.

  18. Zero-gravity atmospheric Cloud Physics Experiment Laboratory; Programmatics report

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The programmatics effort included comprehensive analyses in four major areas: (1) work breakdown structure, (2) schedules, (3) costs, and (4) supporting research and technology. These analyses are discussed in detail in the following sections which identify and define the laboratory project development schedule, cost estimates, funding distributions and supporting research and technology requirements. All programmatics analyses are correlated among themselves and with the technical analyses by means of the work breakdown structure which serves as a common framework for program definition. In addition, the programmatic analyses reflect the results of analyses and plans for reliability, safety, test, and maintenance and refurbishment.

  19. Evidence-based approach to the maintenance of laboratory and medical equipment in resource-poor settings.

    PubMed

    Malkin, Robert; Keane, Allison

    2010-07-01

    Much of the laboratory and medical equipment in resource-poor settings is out-of-service. The most commonly cited reasons are (1) a lack of spare parts and (2) a lack of highly trained technicians. However, there is little data to support these hypotheses, or to generate evidence-based solutions to the problem. We studied 2,849 equipment-repair requests (of which 2,529 were out-of-service medical equipment) from 60 resource-poor hospitals located in 11 nations in Africa, Europe, Asia, and Central America. Each piece of equipment was analyzed by an engineer or an engineering student and a repair was attempted using only locally available materials. If the piece was placed back into service, we assumed that the engineer's problem analysis was correct. A total of 1,821 pieces of medical equipment were placed back into service, or 72%, without requiring the use of imported spare parts. Of those pieces repaired, 1,704 were sufficiently documented to determine what knowledge was required to place the equipment back into service. We found that six domains of knowledge were required to accomplish 99% of the repairs: electrical (18%), mechanical (18%), power supply (14%), plumbing (19%), motors (5%), and installation or user training (25%). A further analysis of the domains shows that 66% of the out-of-service equipment was placed back into service using only 107 skills covering basic knowledge in each domain; far less knowledge than that required of a biomedical engineer or biomedical engineering technician. We conclude that a great majority of laboratory and medical equipment can be put back into service without importing spare parts and using only basic knowledge. Capacity building in resource-poor settings should first focus on a limited set of knowledge; a body of knowledge that we call the biomedical technician's assistant (BTA). This data set suggests that a supported BTA could place 66% of the out-of-service laboratory and medical equipment in their hospital back

  20. A Comprehensive Laboratory Animal Facility Pandemic Response Plan

    PubMed Central

    Roble, Gordon S; Lingenhol, Naomi M; Baker, Bryan; Wilkerson, Amy; Tolwani, Ravi J

    2010-01-01

    The potential of a severe influenza pandemic necessitates the development of an organized, rational plan for continued laboratory animal facility operation without compromise of the welfare of animals. A comprehensive laboratory animal program pandemic response plan was integrated into a university-wide plan. Preparation involved input from all levels of organizational hierarchy including the IACUC. Many contingencies and operational scenarios were considered based on the severity and duration of the influenza pandemic. Trigger points for systematic action steps were based on the World Health Organization's phase alert criteria. One extreme scenario requires hibernation of research operations and maintenance of reduced numbers of laboratory animal colonies for a period of up to 6 mo. This plan includes active recruitment and cross-training of volunteers for essential personnel positions, protective measures for employee and family health, logistical arrangements for delivery and storage of food and bedding, the removal of waste, and the potential for euthanasia. Strategies such as encouraging and subsidizing cryopreservation of unique strains were undertaken to protect valuable research assets and intellectual property. Elements of this plan were put into practice after escalation of the pandemic alerts due to influenza A (H1N1) in April 2009. PMID:20858365

  1. Aripiprazole maintenance increases smoked cocaine self-administration in humans

    PubMed Central

    Rubin, Eric; Foltin, Richard W.

    2011-01-01

    Rationale Partial dopamine receptor agonists have been proposed as candidate pharmacotherapies for cocaine dependence. Objective This 42-day, within-subject, human laboratory study assessed how maintenance on aripiprazole, a partial D2 receptor agonist, influenced smoked cocaine self-administration, cardiovascular measures, subjective effects, and cocaine craving in nontreatment-seeking, cocaine-dependent volunteers. Methods In order to achieve steady-state concentrations, participants (n=8 men) were administered placebo and aripiprazole (15 mg/day) capsules in counter-balanced order for 21 days. A smoked cocaine dose–response curve (0, 12, 25, 50 mg) was determined twice under placebo and aripiprazole maintenance. Sessions comprised a “sample” trial, when participants smoked the cocaine dose available that session, and five choice trials, when they responded on a progressive-ratio schedule of reinforcement to receive the cocaine dose or receive $5.00. Results Cocaine’s reinforcing, subjective, and cardiovascular effects were dose-dependent. Aripiprazole significantly increased cocaine (12, 25 mg) self-administration. Following a single administration of cocaine (25 mg), aripiprazole decreased ratings of how much participants would pay for that dose. Following repeated cocaine (50 mg) self-administration, aripiprazole decreased ratings of cocaine quality, craving, and good drug effect as compared to placebo. Conclusions These data suggest that aripiprazole may have increased self-administration to compensate for a blunted subjective cocaine effect. Overall, the findings do not suggest aripiprazole would be useful for treating cocaine dependence. PMID:21373790

  2. To select the best tool for generating 3D maintenance data and to set the detailed process for obtaining the 3D maintenance data

    NASA Astrophysics Data System (ADS)

    Prashanth, B. N.; Roy, Kingshuk

    2017-07-01

    Three Dimensional (3D) maintenance data provides a link between design and technical documentation creating interactive 3D graphical training and maintenance material. It becomes difficult for an operator to always go through huge paper manuals or come running to the computer for doing maintenance of a machine which makes the maintenance work fatigue. Above being the case, a 3D animation makes maintenance work very simple since, there is no language barrier. The research deals with the generation of 3D maintenance data of any given machine. The best tool for obtaining the 3D maintenance is selected and the tool is analyzed. Using the same tool, a detailed process for extracting the 3D maintenance data for any machine is set. This project aims at selecting the best tool for obtaining 3D maintenance data and to select the detailed process for obtaining 3D maintenance data. 3D maintenance reduces use of big volumes of manuals which creates human errors and makes the work of an operator fatiguing. Hence 3-D maintenance would help in training and maintenance and would increase productivity. 3Dvia when compared with Cortona 3D and Deep Exploration proves to be better than them. 3Dvia is good in data translation and it has the best renderings compared to the other two 3D maintenance software. 3Dvia is very user friendly and it has various options for creating 3D animations. Its Interactive Electronic Technical Publication (IETP) integration is also better than the other two software. Hence 3Dvia proves to be the best software for obtaining 3D maintenance data of any machine.

  3. Methadone maintenance.

    PubMed

    Russell-Taylor, W J

    1975-07-01

    Management of heroin addiction with oral methadone continues to create controversy. Since the first Dole-Nyswander experiments were reported almost a decade ago, methadone maintenance programs have been started in every major city in North America at an estimated public cost in the hundreds of millions of tax dollars. By the end of 1972, the United States alone spending at an annual rate in excess of $250 million, and an expenditure rate in excess of one billion dollars was occurring by the end of 1973. Despite the FDA investigational New Drug status of methadone when used for this purpose, objective data have still not been generated to substantiate the worth of Narcotic Substitution Therapy. Iatrogenic consequences are on the increase, and scepticism is growing among most pharmacologists. A critical evaluation of the entire methadone maintenance approach is being advocated by many and being attempted by some. Data currently being generated at the Philadelphia General Hospital suggest that many patients may have been better managed without methadone.

  4. Maintenance-free lead acid battery for inertial navigation systems aircraft

    NASA Astrophysics Data System (ADS)

    Johnson, William R.; Vutetakis, David G.

    1995-05-01

    Historically, Aircraft Inertial Navigation System (INS) Batteries have utilized vented nickel-cadmium batteries for emergency DC power. The United States Navy and Air Force developed separate systems during their respective INS developments. The Navy contracted with Litton Industries to produce the LTN-72 and Air Force contracted with Delco to produce the Carousel IV INS for the large cargo and specialty aircraft applications. Over the years, a total of eight different battery national stock numbers (NSNs) have entered the stock system along with 75 battery spare part NSNs. The Standard Hardware Acquisition and Reliability Program is working with the Aircraft Battery Group at Naval Surface Warfare Center Crane Division, Naval Air Systems Command (AIR 536), Wright Laboratory, Battelle Memorial Institute, and Concorde Battery Corporation to produce a standard INS battery. This paper discusses the approach taken to determine whether the battery should be replaced and to select the replacement chemistry. The paper also discusses the battery requirements, aircraft that the battery is compatible with, and status of Navy flight evaluation. Projected savings in avoided maintenance in Navy and Air Force INS Systems is projected to be $14.7 million per year with a manpower reduction of 153 maintenance personnel. The new INS battery is compatible with commercially sold INS systems which represents 66 percent of the systems sold.

  5. 47 CFR 80.96 - Maintenance tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Maintenance tests. 80.96 Section 80.96... tests. Stations are authorized to engage in test transmissions necessary for maintenance of the station. Test transmissions must conform to appropriate test operating procedures. ...

  6. The changing face of hemostasis testing in modern laboratories: consolidation, automation, and beyond.

    PubMed

    Lippi, Giuseppe; Plebani, Mario; Favaloro, Emmanuel J

    2015-04-01

    The reality of laboratory diagnostics as a whole, and hemostasis testing in particular, is evolving under new paradigms of efficiency. The driving forces of health care and laboratory diagnostics in the third millennium are mainly represented by macro- and microeconomics. In a world with limited resources, shattered by an unprecedented economic crisis, laboratory diagnostics is undergoing a substantial reorganization, with emergence of new models under the imperative of terms, such as bedside testing, consolidation, and networking. The paradigms under which these changes are being developed include a variety of environment, preanalytical, technological, professional, and health-care aspects. The maintenance of continued quality is indeed the major challenge to be faced in the foreseeable future. In fact, some challenges prepotently emerge during a consolidation process, which basically involve delayed testing, centrifugation, transportation, and stability of the specimens, as well as the potential mismatch of sample matrix. This article is aimed to provide an overview of the current economic scenario of laboratory diagnostics and discuss the changing face of hemostasis testing in modern laboratories, providing a synthetic overview about potential drawbacks of actualized solutions. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  7. 49 CFR 230.66 - Design, construction, and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Steam Locomotives and Tenders § 230.66 Design, construction, and maintenance. The steam locomotive owner and operator are responsible for the general design, construction and maintenance of the steam locomotives and...

  8. Maintenance Communications for the 1990’s,

    DTIC Science & Technology

    1983-07-01

    reverse aide If necessary and Identify by block n.mber) * -This study details weaknesses in the present maintenance communications system...I. I. STrTAMEr OF NEED: Survivable Maintenance Cacputer System. "- DISCUSSION: The maintenance ccmputer system aids immeasurably in the...GRAVELY, Samuel L. (VAdm, USN-Ret), "Integrated Information Display Systen - A Decision Aid ," Signal, March 1983, p.53-60. GRAVELY, Samuel L. (VAdm, USN

  9. Randomized prospective trial of ganciclovir maintenance therapy for cytomegalovirus retinitis.

    PubMed

    Jacobson, M A; O'Donnell, J J; Brodie, H R; Wofsy, C; Mills, J

    1988-07-01

    We report the first randomized prospective comparative study of long-term maintenance ganciclovir (9-[2-hydroxy-1-(hydroxymethyl)ethoxymethyl]guanine, BW759U, DHPG) therapy for cytomegalovirus retinitis in patients with the acquired immunodeficiency syndrome (AIDS). Eleven retinitis patients who received a 10-day course of ganciclovir induction therapy and then were randomized to receive either immediate daily ganciclovir maintenance therapy or deferred maintenance (eight deferred maintenance, three immediate maintenance) were evaluated for drug efficacy. Median time to retinitis progression was 42 days for the immediate maintenance group compared with 16 days for the deferred maintenance group, (P = 0.07). After crossing over to maintenance therapy, patients in the deferred group had a median time to retinitis progression of 58 days compared to 16 days while not on maintenance therapy (P = 0.13). Only 9% of cultures obtained while patients received maintenance therapy were positive for cytomegalovirus, vs 40% of those obtained off maintenance (P less than 0.001). We can state then that maintenance therapy with ganciclovir delays, but does not halt, progression of cytomegalovirus retinitis and suppresses, but does not eradicate, cytomegalovirus shedding in patients with AIDS.

  10. Understanding and Predicting the Process of Software Maintenance Releases

    NASA Technical Reports Server (NTRS)

    Basili, Victor; Briand, Lionel; Condon, Steven; Kim, Yong-Mi; Melo, Walcelio L.; Valett, Jon D.

    1996-01-01

    One of the major concerns of any maintenance organization is to understand and estimate the cost of maintenance releases of software systems. Planning the next release so as to maximize the increase in functionality and the improvement in quality are vital to successful maintenance management. The objective of this paper is to present the results of a case study in which an incremental approach was used to better understand the effort distribution of releases and build a predictive effort model for software maintenance releases. This study was conducted in the Flight Dynamics Division (FDD) of NASA Goddard Space Flight Center(GSFC). This paper presents three main results: 1) a predictive effort model developed for the FDD's software maintenance release process; 2) measurement-based lessons learned about the maintenance process in the FDD; and 3) a set of lessons learned about the establishment of a measurement-based software maintenance improvement program. In addition, this study provides insights and guidelines for obtaining similar results in other maintenance organizations.

  11. 14 CFR 91.1111 - Maintenance training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Maintenance training. 91.1111 Section 91... Operations Program Management § 91.1111 Maintenance training. The program manager must ensure that all... annual recurrent training and are competent to perform those duties. ...

  12. 14 CFR 91.1111 - Maintenance training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Maintenance training. 91.1111 Section 91... Operations Program Management § 91.1111 Maintenance training. The program manager must ensure that all... annual recurrent training and are competent to perform those duties. ...

  13. 5 CFR 850.302 - Record maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 2 2012-01-01 2012-01-01 false Record maintenance. 850.302 Section 850.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT SYSTEMS MODERNIZATION Records § 850.302 Record maintenance. (a) The retirement and...

  14. 5 CFR 850.302 - Record maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false Record maintenance. 850.302 Section 850.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT SYSTEMS MODERNIZATION Records § 850.302 Record maintenance. (a) The retirement and...

  15. 5 CFR 850.302 - Record maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Record maintenance. 850.302 Section 850.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT SYSTEMS MODERNIZATION Records § 850.302 Record maintenance. (a) The retirement and...

  16. 5 CFR 850.302 - Record maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Record maintenance. 850.302 Section 850.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT SYSTEMS MODERNIZATION Records § 850.302 Record maintenance. (a) The retirement and...

  17. 47 CFR 101.1109 - Records maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Records maintenance. 101.1109 Section 101.1109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Competitive Bidding Procedures for LMDS § 101.1109 Records maintenance. All winning bidders...

  18. 47 CFR 101.1109 - Records maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Records maintenance. 101.1109 Section 101.1109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Competitive Bidding Procedures for LMDS § 101.1109 Records maintenance. All winning bidders...

  19. 47 CFR 101.1109 - Records maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Records maintenance. 101.1109 Section 101.1109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Competitive Bidding Procedures for LMDS § 101.1109 Records maintenance. All winning bidders...

  20. 47 CFR 101.1109 - Records maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Records maintenance. 101.1109 Section 101.1109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Competitive Bidding Procedures for LMDS § 101.1109 Records maintenance. All winning bidders...

  1. Care and Maintenance.

    ERIC Educational Resources Information Center

    Hampton, Carolyn H.; Hampton, Carol D.

    1979-01-01

    The classroom care and maintenance of terrestrial isopods is described. Includes illustrations of isopod external anatomy, a potato trap for collecting isopods, and a constructed habitat for raising isopods. (MA)

  2. Reproducibility in light microscopy: Maintenance, standards and SOPs.

    PubMed

    Deagle, Rebecca C; Wee, Tse-Luen Erika; Brown, Claire M

    2017-08-01

    Light microscopy has grown to be a valuable asset in both the physical and life sciences. It is a highly quantitative method available in individual research laboratories and often centralized in core facilities. However, although quantitative microscopy is becoming a customary tool in research, it is rarely standardized. To achieve accurate quantitative microscopy data and reproducible results, three levels of standardization must be considered: (1) aspects of the microscope, (2) the sample, and (3) the detector. The accuracy of the data is only as reliable as the imaging system itself, thereby imposing the need for routine standard performance testing. Depending on the task some maintenance procedures should be performed once a month, some before each imaging session, while others conducted annually. This text should be implemented as a resource for researchers to integrate with their own standard operating procedures to ensure the highest quality quantitative microscopy data. Copyright © 2017. Published by Elsevier Ltd.

  3. Reduction of Maintenance Error Through Focused Interventions

    NASA Technical Reports Server (NTRS)

    Kanki, Barbara G.; Walter, Diane; Rosekind, Mark R. (Technical Monitor)

    1997-01-01

    It is well known that a significant proportion of aviation accidents and incidents are tied to human error. In flight operations, research of operational errors has shown that so-called "pilot error" often involves a variety of human factors issues and not a simple lack of individual technical skills. In aircraft maintenance operations, there is similar concern that maintenance errors which may lead to incidents and accidents are related to a large variety of human factors issues. Although maintenance error data and research are limited, industry initiatives involving human factors training in maintenance have become increasingly accepted as one type of maintenance error intervention. Conscientious efforts have been made in re-inventing the "team" concept for maintenance operations and in tailoring programs to fit the needs of technical operations. Nevertheless, there remains a dual challenge: to develop human factors interventions which are directly supported by reliable human error data, and to integrate human factors concepts into the procedures and practices of everyday technical tasks. In this paper, we describe several varieties of human factors interventions and focus on two specific alternatives which target problems related to procedures and practices; namely, 1) structured on-the-job training and 2) procedure re-design. We hope to demonstrate that the key to leveraging the impact of these solutions comes from focused interventions; that is, interventions which are derived from a clear understanding of specific maintenance errors, their operational context and human factors components.

  4. Building laboratory capacity to support HIV care in Nigeria: Harvard/APIN PEPFAR, 2004-2012.

    PubMed

    Hamel, Donald J; Sankalé, Jean-Louis; Samuels, Jay Osi; Sarr, Abdoulaye D; Chaplin, Beth; Ofuche, Eke; Meloni, Seema T; Okonkwo, Prosper; Kanki, Phyllis J

    From 2004-2012, the Harvard/AIDS Prevention Initiative in Nigeria, funded through the US President's Emergency Plan for AIDS Relief programme, scaled up HIV care and treatment services in Nigeria. We describe the methodologies and collaborative processes developed to improve laboratory capacity significantly in a resource-limited setting. These methods were implemented at 35 clinic and laboratory locations. Systems were established and modified to optimise numerous laboratory processes. These included strategies for clinic selection and management, equipment and reagent procurement, supply chains, laboratory renovations, equipment maintenance, electronic data management, quality development programmes and trainings. Over the eight-year programme, laboratories supported 160 000 patients receiving HIV care in Nigeria, delivering over 2.5 million test results, including regular viral load quantitation. External quality assurance systems were established for CD4+ cell count enumeration, blood chemistries and viral load monitoring. Laboratory equipment platforms were improved and standardised and use of point-of-care analysers was expanded. Laboratory training workshops supported laboratories toward increasing staff skills and improving overall quality. Participation in a World Health Organisation-led African laboratory quality improvement system resulted in significant gains in quality measures at five laboratories. Targeted implementation of laboratory development processes, during simultaneous scale-up of HIV treatment programmes in a resource-limited setting, can elicit meaningful gains in laboratory quality and capacity. Systems to improve the physical laboratory environment, develop laboratory staff, create improvements to reduce costs and increase quality are available for future health and laboratory strengthening programmes. We hope that the strategies employed may inform and encourage the development of other laboratories in resource-limited settings.

  5. Design of preventive maintenance system using the reliability engineering and maintenance value stream mapping methods in PT. XYZ

    NASA Astrophysics Data System (ADS)

    Sembiring, N.; Panjaitan, N.; Angelita, S.

    2018-02-01

    PT. XYZ is a company owned by non-governmental organizations engaged in the field of production of rubber processing becoming crumb rubber. Part of the production is supported by some of machines and interacting equipment to achieve optimal productivity. Types of the machine that are used in the production process are Conveyor Breaker, Breaker, Rolling Pin, Hammer Mill, Mill Roll, Conveyor, Shredder Crumb, and Dryer. Maintenance system in PT. XYZ is corrective maintenance i.e. repairing or replacing the engine components after the crash on the machine. Replacement of engine components on corrective maintenance causes the machine to stop operating during the production process is in progress. The result is in the loss of production time due to the operator must replace the damaged engine components. The loss of production time can impact on the production targets which were not reached and lead to high loss costs. The cost for all components is Rp. 4.088.514.505. This cost is really high just for maintaining a Mill Roll Machine. Therefore PT. XYZ is needed to do preventive maintenance i.e. scheduling engine components and improving maintenance efficiency. The used methods are Reliability Engineering and Maintenance Value Stream Mapping (MVSM). The needed data in this research are the interval of time damage to engine components, opportunity cost, labor cost, component cost, corrective repair time, preventive repair time, Mean Time To Opportunity (MTTO), Mean Time To Repair (MTTR), and Mean Time To Yield (MTTY). In this research, the critical components of Mill Roll machine are Spier, Bushing, Bearing, Coupling and Roll. Determination of damage distribution, reliability, MTTF, cost of failure, cost of preventive, current state map, and future state map are done so that the replacement time for each critical component with the lowest maintenance cost and preparation of Standard Operation Procedure (SOP) are developed. For the critical component that has been

  6. Woodwind Instrument Maintenance.

    ERIC Educational Resources Information Center

    Sperl, Gary

    1980-01-01

    The author presents a simple maintenance program for woodwind instruments which includes the care of tendon corks, the need for oiling keys, and methods of preventing cracks in woodwind instruments. (KC)

  7. Expert Assessment of Conditions for Accredited Quality Management System Functioning in Testing Laboratories

    NASA Astrophysics Data System (ADS)

    Mytych, Joanna; Ligarski, Mariusz J.

    2018-03-01

    The quality management systems compliant with the ISO 9001:2009 have been thoroughly researched and described in detail in the world literature. The accredited management systems used in the testing laboratories and compliant with the ISO/IEC 17025:2005 have been mainly described in terms of the system design and implementation. They have also been investigated from the analytical point of view. Unfortunately, a low number of studies concerned the management system functioning in the accredited testing laboratories. The aim of following study was to assess the management system functioning in the accredited testing laboratories in Poland. On 8 October 2015, 1,213 accredited testing laboratories were present in Poland. They investigated various scientific areas and substances/objects. There are more and more such laboratories that have various problems and different long-term experience when it comes to the implementation, maintenance and improvement of the management systems. The article describes the results of the conducted expert assessment (survey) carried out to examine the conditions for the functioning of a management system in an accredited laboratory. It also focuses on the characteristics of the accredited research laboratories in Poland. The authors discuss the selection of the external and internal conditions that may affect the accredited management system. They show how the experts assessing the selected conditions were chosen. The survey results are also presented.

  8. Health And Safety In Maintenance Activities

    NASA Astrophysics Data System (ADS)

    Ungureanu, Nicolae Stelian; Daraba, Dinu; Moraru, Roland Iosif

    2015-07-01

    The paper examines some aspects of health and safety at work in maintenance activities. It was analysed the occurrence of accidents, statistically, in maintenance work. There have been identified a number of causes of accidents and there have been proposed some measures to reduce them.

  9. Vibration syndrome in railway track maintenance workers.

    PubMed

    Virokannas, H; Anttonen, H; Niskanen, J

    1995-01-01

    An inquiry was sent to all railway maintenance workers in three railway districts in Finland and hand-arm vibration was measured on the handlebars of tools used by maintenance workers. The study group included 252 (82%) subjects, whose mean age was 41 years and who had worked in track maintenance for 14 years (SD 9). In Finland there are over 600 railway maintenance workers who use vibrating tools. The frequency-weighted acceleration of hand-arm vibration was calculated according to the ISO 5349 standard. Hand-held tamping machines had caused most of the vibration exposure, and aw4h was 10.6 m/s2 measured on the handlebar of tamping machine, but many workers also used other vibrating tools. The annual vibration level was 2.5 m/s2 when the use of all vibrating tools and the exposure time was taken into account. In the questionnaire the prevalence of vibration-induced white finger (VWF) was 14% in the entire material, and the prevalence of VWF increased significantly with the total duration of the maintenance work. In addition, 39% of the subjects had suffered numbness of the hands, and the prevalence of hand numbness also increased significantly with the total duration of maintenance work. According to the measurements of vibration and the prevalence of hand symptoms the present investigation indicates vibration syndrome as being related to railway track maintenance work. In the exposure group, where tamping machines mainly were used and exposure to other vibration was small, the prevalence of VWF was also significantly higher, but the prevalence of hand numbness insignificant compared with the control group. In this study vascular and nerve hand symptoms were considered to cause serious trouble in work by 4-11% of the maintenance workers.

  10. Small satellite debris catalog maintenance issues

    NASA Technical Reports Server (NTRS)

    Jackson, Phoebe A.

    1991-01-01

    The United States Space Command (USSPACECOM) is a unified command of the Department of Defense, and one of its tasks is to detect, track, identify, and maintain a catalog of all man-made objects in Earth orbit. This task is called space surveillance, and the most important tool for space surveillance is the satellite catalog. The command's reasons for performing satellite catalog maintenance is presented. A satellite catalog is described, and small satellite-debris catalog-maintenance issues are identified. The underlying rationale is to describe the catalog maintenance services so that the members of the community can use them with assurance.

  11. Elderly health beliefs, attitudes, and maintenance.

    PubMed

    Jensen, J; Counte, M A; Glandon, G L

    1992-07-01

    Why older persons engage in varying amounts of health maintenance activity is becoming both an increasingly important policy issue and a topic of interest to health services researchers. Such activity may help the elderly to delay the onset of the health-related problems associated with aging, maintain if not improve their functional abilities, and perhaps improve their quality of life. Using a conceptual model largely based upon the health belief model, this study sought to examine predictors of variability of health maintenance activity among older persons. The project included cross-sectional data drawn from the first phase of a multiyear panel study of elderly community residents. Results of ordinary least-squares and logistic regression analyses of seven types of health maintenance activity suggest that health beliefs are an important consideration but that other variables, namely, type of insurance plan and select sociodemographic factors, also had significant impacts. Another consistent finding was that each of the types of health maintenance activity was associated with different types of predictor variables. These findings suggest that in order for levels of health maintenance activity to be increased, intervention programs need to be targeted toward specific types of health beliefs and need to take into account the importance of social differences.

  12. The recording of student performance in the microbiology laboratory as a training, tutorial, and motivational tool.

    PubMed

    Lipson, Steven M; Gair, Marina

    2011-01-01

    The laboratory component of a microbiology course consists of exercises which mandate a level of proficiency and manual dexterity equal to and often beyond that recognized among other biology courses. Bacterial growth, maintenance, identification (e.g., Gram stain, biochemical tests, genomics), as well as the continuous need to maintain laboratory safety and sterile technique, are only a few skills/responsibilities critical to the discipline of microbiology. Performance of the Gram stain remains one of the most basic and pivotal skills that must be mastered in the microbiology laboratory. However, a number of students continually have difficulty executing the Gram stain and preparative procedures associated with the test. In order to address this issue, we incorporated real-time digital recording as a supplemental teaching aid in the microbiology laboratory. Our use of the digital movie camera in the teaching setting served to enhance interest, motivate students, and in general, improve student performance.

  13. Leveraging the real value of laboratory medicine with the value proposition.

    PubMed

    Price, Christopher P; John, Andrew St; Christenson, Robert; Scharnhorst, Volker; Oellerich, Michael; Jones, Patricia; Morris, Howard A

    2016-11-01

    Improving quality and patient safety, containing costs and delivering value-for-money are the key drivers of change in the delivery of healthcare and have stimulated a shift from an activity-based service to a service based on patient-outcomes. The delivery of an outcomes-based healthcare agenda requires that the real value of laboratory medicine to all stakeholders be understood, effectively defined and communicated. The value proposition of any product or service is the link between the provider and the needs of the customer describing the utility of the product or service in terms of benefit to the customer. The framework of a value proposition for laboratory medicine provides the core business case that drives key activities in the evolution and maintenance of high quality healthcare from research through to adoption and quality improvement in an established service. The framework of a value proposition for laboratory medicine is described. The content is endorsed by IFCC and WASPaLM. Copyright © 2016 Elsevier B.V. All rights reserved.

  14. Going GLP: Conducting Toxicology Studies in Compliance with Good Laboratory Practices.

    PubMed

    Carroll, Erica Eggers

    2016-01-01

    Good laboratory practice standards are US federal regulations enacted as part of the Federal Insecticide, Fungicide, and Rodenticide Act (40 CFR Part 160), the Toxic Substance Control Act (40 CFR Part 792), and the Good Laboratory Practice for Nonclinical Laboratory Studies (21 CFR Part 58) to support protection of public health in the areas of pesticides, chemicals, and drug investigations in response to allegations of inaccurate data acquisition. Essentially, good laboratory practices (GLPs) are a system of management controls for nonclinical research studies involving animals to ensure the uniformity, consistency, reliability, reproducibility, quality, and integrity of data collected as part of chemical (including pharmaceuticals) tests, from in vitro through acute to chronic toxicity tests. The GLPs were established in the United States in 1978 as a result of the Industrial Bio-Test Laboratory scandal which led to congressional hearings and actions to prevent fraudulent data reporting and collection. Although the establishment of infrastructure for GLPs compliance is labor-intensive and time-consuming, achievement and maintenance of GLP compliance ensures the accuracy of the data collected from each study, which is critical for defending results, advancing science, and protecting human and animal health. This article describes how and why those in the US Army Medical Department responsible for protecting the public health of US Army and other military personnel made the policy decision to have its toxicology laboratory achieve complete compliance with GLP standards, the first such among US Army laboratories. The challenges faced and how they were overcome are detailed.

  15. A Grounded Theory Study of Aircraft Maintenance Technician Decision-Making

    NASA Astrophysics Data System (ADS)

    Norcross, Robert

    Aircraft maintenance technician decision-making and actions have resulted in aircraft system errors causing aircraft incidents and accidents. Aircraft accident investigators and researchers examined the factors that influence aircraft maintenance technician errors and categorized the types of errors in an attempt to prevent similar occurrences. New aircraft technology introduced to improve aviation safety and efficiency incur failures that have no information contained in the aircraft maintenance manuals. According to the Federal Aviation Administration, aircraft maintenance technicians must use only approved aircraft maintenance documents to repair, modify, and service aircraft. This qualitative research used a grounded theory approach to explore the decision-making processes and actions taken by aircraft maintenance technicians when confronted with an aircraft problem not contained in the aircraft maintenance manuals. The target population for the research was Federal Aviation Administration licensed aircraft and power plant mechanics from across the United States. Nonprobability purposeful sampling was used to obtain aircraft maintenance technicians with the experience sought in the study problem. The sample population recruitment yielded 19 participants for eight focus group sessions to obtain opinions, perceptions, and experiences related to the study problem. All data collected was entered into the Atlas ti qualitative analysis software. The emergence of Aircraft Maintenance Technician decision-making themes regarding Aircraft Maintenance Manual content, Aircraft Maintenance Technician experience, and legal implications of not following Aircraft Maintenance Manuals surfaced. Conclusions from this study suggest Aircraft Maintenance Technician decision-making were influenced by experience, gaps in the Aircraft Maintenance Manuals, reliance on others, realizing the impact of decisions concerning aircraft airworthiness, management pressures, and legal concerns

  16. 47 CFR 90.1023 - Records maintenance and definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Records maintenance and definitions. 90.1023....1023 Records maintenance and definitions. (a) Records maintenance. All winning bidders qualifying as small or very small businesses shall maintain at their principal place of business an updated file of...

  17. 47 CFR 90.815 - Records maintenance and definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Records maintenance and definitions. 90.815... Radio Service § 90.815 Records maintenance and definitions. (a) Records maintenance. All winning bidders qualifying as small businesses, shall maintain at their principal place of business an updated file of...

  18. 14 CFR 147.38 - Maintenance of curriculum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Maintenance of curriculum requirements. 147... § 147.38 Maintenance of curriculum requirements. (a) Each certificated aviation maintenance technician school shall adhere to its approved curriculum. With FAA approval, curriculum subjects may be taught at...

  19. How to Get a Maintenance Program Underway

    ERIC Educational Resources Information Center

    Lundy, Lyndall L.

    1975-01-01

    The article describes the development of a comprehensive maintenance program for the school shop. A general maintenance management outline provides direction for planning, execution, and evaluation. (MW)

  20. Measuring the performance of maintenance service outsourcing.

    PubMed

    Cruz, Antonio Miguel; Rincon, Adriana Maria Rios; Haugan, Gregory L

    2013-01-01

    The aims of this paper are (1) to identify the characteristics of maintenance service providers that directly impact maintenance service quality, using 18 independent covariables; (2) to quantify the change in risk these covariables present to service quality, measured in terms of equipment turnaround time (TAT). A survey was applied to every maintenance service provider (n = 19) for characterization purposes. The equipment inventory was characterized, and the TAT variable recorded and monitored for every work order of each service provider (N = 1,025). Finally, the research team conducted a statistical analysis to accomplish the research objectives. The results of this study offer strong empirical evidence that the most influential variables affecting the quality of maintenance service performance are the following: type of maintenance, availability of spare parts in the country, user training, technological complexity of the equipment, distance between the company and the hospital, and the number of maintenance visits performed by the company. The strength of the results obtained by the Cox model built are supported by the measure of the Rp,e(2) = 0.57 with a value of Rp,e= 0.75. Thus, the model explained 57% of the variation in equipment TAT, with moderate high positive correlation between the dependent variable (TAT) and independent variables.

  1. Modeling a maintenance simulation of the geosynchronous platform

    NASA Technical Reports Server (NTRS)

    Kleiner, A. F., Jr.

    1980-01-01

    A modeling technique used to conduct a simulation study comparing various maintenance routines for a space platform is dicussed. A system model is described and illustrated, the basic concepts of a simulation pass are detailed, and sections on failures and maintenance are included. The operation of the system across time is best modeled by a discrete event approach with two basic events - failure and maintenance of the system. Each overall simulation run consists of introducing a particular model of the physical system, together with a maintenance policy, demand function, and mission lifetime. The system is then run through many passes, each pass corresponding to one mission and the model is re-initialized before each pass. Statistics are compiled at the end of each pass and after the last pass a report is printed. Items of interest typically include the time to first maintenance, total number of maintenance trips for each pass, average capability of the system, etc.

  2. Competency-Based Horticulture: Turfgrass Maintenance Worker.

    ERIC Educational Resources Information Center

    College of DuPage, Glen Ellyn, IL.

    This competency-based horticulture curriculum guide is designed to provide secondary and postsecondary horticulture teachers with a task-oriented program for training turfgrass maintenance workers. It contains a master resource list, a listing of turfgrass maintenance resources available from various states, and 59 competency task sheets organized…

  3. The Chemistry of Swimming Pool Maintenance

    ERIC Educational Resources Information Center

    Salter, Carl; Langhus, David L.

    2007-01-01

    The study of chemistry involved in the maintenance of a swimming pool provides a lot of chemical education to the students, including the demonstration of the importance of pH in water chemistry. The various chemical aspects hidden in the maintenance of the pool are being described.

  4. 41 CFR 101-39.303 - Maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Maintenance. 101-39.303 Section 101-39.303 Public Contracts and Property Management Federal Property Management Regulations System... Maintenance. In order to ensure uninterrupted operation of GSA Interagency Fleet Management System (IFMS...

  5. Foreign Language Maintenance Classes for Returnees.

    ERIC Educational Resources Information Center

    Yashiro, Kyoko

    Recent studies by the Management and Coordination Agency of the Japanese government and the Japan Overseas Educational Services (JOES) reveal that Japanese students returning from overseas want to retain their foreign language, and that a majority undertake various maintenance activities. Maintenance classes are widely adopted. Research indicates…

  6. Putting Relationship Maintenance into Proper Perspectives.

    ERIC Educational Resources Information Center

    Aleman, Carlos G.

    Noting that scholars often agree that varying investigations of relationship maintenance are only different mappings of the same territory, this paper organizes and criticizes the literature on relationship change from a position that defines maintenance as behavior that functions to sustain interpersonal bonds towards future interaction. The…

  7. Dietary intakes associated with successful weight loss and maintenance during the Weight Loss Maintenance Trial

    PubMed Central

    Champagne, Catherine M.; Broyles, Stephanie T; Moran, Laura D.; Cash, Katherine C.; Levy, Erma J.; Lin, Pao-Hwa; Batch, Bryan C.; Lien, Lillian F.; Funk, Kristine L.; Dalcin, Arlene; Loria, Catherine; Myers, Valerie H.

    2011-01-01

    Background Dietary components effective in weight maintenance efforts have not been adequately identified. Objective To determine impact of changes in dietary consumption on weight loss and maintenance during the Weight Loss Maintenance (WLM) clinical trial. Design WLM was a randomized controlled trial. Successful weight loss participants who completed Phase I of the trial and lost 4kg were randomized to one of three maintenance intervention arms in Phase II and followed for an additional 30 months. Participants/setting The multicenter trial was conducted from 2003–2007. This substudy included 828 successful weight loss participants. Methods Dietary Measures The Block Food Frequency Questionnaire (FFQ) was used to assess nutrient intake levels and food group servings. Carbohydrates, proteins, fats, dietary fiber and fruit/vegetable and dairy servings were utilized as predictor variables. Data collection The FFQ was collected on all participants at study entry (beginning of Phase I). Those randomized to Phase II completed the FFQ at three additional time points; randomization (beginning of Phase II), 12 and 30 months. Intervention The main intervention focused on long term maintenance of weight loss using the Dietary Approaches to Hypertension (DASH) diet. This substudy examined whether changes to specific dietary variables were associated with weight loss and maintenance. Statistical analyses performed Linear regression models that adjusted for change in total energy examined the relationship between changes in dietary intake and weight for each time period. Site, age, race, sex, and a race-sex interaction were included as covariates. Results Participants who substituted protein for fat lost, on average, 0.33 kg per 6-months during Phase I (p<0.0001) and 0.07 kg per 6-months during Phase II (p<0.0001) per 1% increase in protein. Increased intake of fruits and vegetables was associated with weight loss in Phases I and II: 0.29 kg per 6-months (p<0.0001) and 0

  8. 47 CFR 90.913 - Record maintenance and definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... such files for the term of the license. (b) Definitions. The terms small and very small business used... 47 Telecommunication 5 2010-10-01 2010-10-01 false Record maintenance and definitions. 90.913... Radio Service § 90.913 Record maintenance and definitions. (a) Records maintenance. All winning bidders...

  9. 49 CFR 236.1039 - Operations and Maintenance Manual.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operations and Maintenance Manual. 236.1039... Train Control Systems § 236.1039 Operations and Maintenance Manual. (a) The railroad shall catalog and..., modification, inspection, and testing of the PTC system and have them in one Operations and Maintenance Manual...

  10. Qualitative study on maintenance management in Moroccan industries

    NASA Astrophysics Data System (ADS)

    Naji, Amal; El Oumami, Mohamed; Bouksour, Otmane; Beidouri, Zitouni

    2018-05-01

    Maintenance management is, and has been studied in depth, especially for strategies to be implemented in industry, even though, authors note that there is a gap between literature and management adopted by industries. In this paper, we present a qualitative study in five Moroccan industries to investigate “how maintenance is managed” rather than “how it should be”. The questionnaire utilized for the study consists on semi-structured and open-ended questions. We consider factors and variables related to maintenance management and we explore the relationships between those factors. The original contribution of this paper is to provide a «real view »about maintenance management in Moroccan industries, which could help to improve understanding of barriers to implementing maintenance strategy.

  11. Lawrence Berkeley National Laboratory 2015 Annual Financial Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Kim, P

    FY2015 financial results reflect a year of significant scientific, operational and financial achievement for Lawrence Berkeley National Laboratory. Complementing many scientific accomplishments, Berkeley Lab completed construction of four new research facilities: the General Purpose Laboratory, Chu Hall, Wang Hall and the Flexlab Building Efficiency Testbed. These state-of-the-art facilities allow for program growth and enhanced collaboration, in part by enabling programs to return to the Lab’s Hill Campus from offsite locations. Detailed planning began for the new Integrative Genomics Building (IGB) that will house another major program currently located offsite. Existing site infrastructure was another key focus area. The Lab prioritizedmore » and increased investments in deferred maintenance in alignment with the Berkeley Lab Infrastructure Plan, which was developed under the leadership of the DOE Office of Science. With the expiration of American Recovery and Reinvestment Act (ARRA) funds, we completed the close-out of all of our 134 ARRA projects, recording total costs of $331M over the FY2009-2015 period. Download the report to read more.« less

  12. Laboratory Maintenance of Helicobacter Species

    PubMed Central

    Blanchard, Thomas G.; Nedrud, John G.

    2012-01-01

    Helicobacter species are Gram-negative bacteria that colonize the gastric or intestinal mucosa of many mammalian and avian hosts and induce histologic inflammation. The association of H. pylori with gastritis, peptic ulcer disease, and gastric cancers makes it a significant human pathogen. Animal models for these diseases are being used to explore the pathogenesis of H. pylori infection and in vaccine development (UNIT 8B.1). Both bacterial and host factors contribute to Helicobacter pathogenesis, and therefore the microbiology is very important. This unit describes how to culture the most commonly used gastric Helicobacter species, H. pylori, H. mustelae, and H. felis. PMID:18770594

  13. How to Cut Landscape Maintenance Costs.

    ERIC Educational Resources Information Center

    Brickman, Dick

    1982-01-01

    A landscape architect explains how maintenance requirements and costs are affected by landscape design, the physical demands of the site, and the relative use of grass, ground cover, shrubs, and trees. The relationship of these factors to initial and ongoing maintenance costs, including staff requirements, is discussed. (MLF)

  14. 47 CFR 80.96 - Maintenance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Maintenance tests. 80.96 Section 80.96 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Operating Procedures-General § 80.96 Maintenance tests. Stations are authorized to...

  15. Stick with a School Maintenance Plan

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2012-01-01

    The U.S. Department of Education's "Planning Guide for Maintaining School Facilities" states that a sound facilities maintenance plan serves as evidence that school facilities are, and will be, cared for appropriately. On the other hand, negligent facilities maintenance planning can cause real problems. Budget restraints and cuts in…

  16. 7 CFR 772.5 - Security maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Security maintenance. 772.5 Section 772.5 Agriculture... SPECIAL PROGRAMS SERVICING MINOR PROGRAM LOANS § 772.5 Security maintenance. (a) General. Borrowers are responsible for maintaining the collateral that is serving as security for their Minor Program loan in...

  17. 7 CFR 772.5 - Security maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 7 2012-01-01 2012-01-01 false Security maintenance. 772.5 Section 772.5 Agriculture... SPECIAL PROGRAMS SERVICING MINOR PROGRAM LOANS § 772.5 Security maintenance. (a) General. Borrowers are responsible for maintaining the collateral that is serving as security for their Minor Program loan in...

  18. Perceptions and attitudes toward SLMTA amongst laboratory and hospital professionals in Ethiopia.

    PubMed

    Lulie, Adino D; Hiwotu, Tilahun M; Mulugeta, Achamyeleh; Kebede, Adisu; Asrat, Habtamu; Abebe, Abnet; Yenealem, Dereje; Abose, Ebise; Kassa, Wondwossen; Kebede, Amha; Linde, Mary K; Ayana, Gonfa

    2014-01-01

    Strengthening Laboratory Management Toward Accreditation (SLMTA) is a competency-based management training programme. Assessing health professionals' views of SLMTA provides feedback to inform program planning, implementation and evaluation of SLMTA's training, communication and mentorship components. To assess laboratory professionals' and hospital chief executive officers' (CEOs) perceptions and attitudes toward the SLMTA programme in Ethiopia. A cross-sectional descriptive survey was conducted in March 2013 using a structured questionnaire to collect qualitative data from 72 laboratory professionals and hospital CEOs from 17 health facilities, representing all regions and two city administrations in Ethiopia. Focus groups were conducted with laboratory professionals and hospital administration to gain insight into the strengths and challenges of the SLMTA programme so as to guide future planning and implementation. Ethiopian laboratory professionals at all levels had a supportive attitude toward the SLMTA programme. They believed that SLMTA substantially improved laboratory services and acted as a catalyst for total healthcare reform and improvement. They also noted that the SLMTA programme achieved marked progress in laboratory supply chain, sample referral, instrument maintenance and data management systems. In contrast, nearly half of the participating hospital CEOs, especially those associated with low-scoring laboratories, were sceptical about the SLMTA programme, believing that the benefits of SLMTA were outweighed by the level of human resources and time commitment required. They also voiced concerns about the cost and sustainability of SLMTA. This study highlights the need for stronger engagement and advocacy with hospital administration and the importance of addressing concerns about the cost and sustainability of the SLMTA programme.

  19. Improved vigilance after sodium oxybate treatment in narcolepsy: a comparison between in-field and in-laboratory measurements.

    PubMed

    van Schie, Mojca K M; Werth, Esther; Lammers, Gert Jan; Overeem, Sebastiaan; Baumann, Christian R; Fronczek, Rolf

    2016-08-01

    This two-centre observational study of vigilance measurements assessed the feasibility of vigilance measurements on multiple days using the Sustained Attention to Response Task and the Psychomotor Vigilance Test with portable task equipment, and subsequently assessed the effect of sodium oxybate treatment on vigilance in patients with narcolepsy. Twenty-six patients with narcolepsy and 15 healthy controls were included. The study comprised two in-laboratory days for the Maintenance of Wakefulness Test and the Oxford Sleep Resistance test, followed by 7-day portable vigilance battery measurements. This procedure was repeated for patients with narcolepsy after at least 3 months of stable treatment with sodium oxybate. Patients with narcolepsy had a higher Sustained Attention to Response Task error count, lower Psychomotor Vigilance Test reciprocal reaction time, higher Oxford Sleep Resistance test omission error count adjusted for test duration (Oxford Sleep Resistance testOMIS / MIN ), and lower Oxford Sleep Resistance test and Maintenance of Wakefulness Test sleep latency compared with controls (all P < 0.01). Treatment with sodium oxybate was associated with a longer Maintenance of Wakefulness Test sleep latency (P < 0.01), lower Oxford Sleep Resistance testOMIS / MIN (P = 0.01) and a lower Sustained Attention to Response Task error count (P = 0.01) in patients with narcolepsy, but not with absolute changes in Oxford Sleep Resistance test sleep latency or Psychomotor Vigilance Test reciprocal reaction time. It was concluded that portable measurements of sustained attention as well as in-laboratory Oxford Sleep Resistance test and Maintenance of Wakefulness Test measurements revealed worse performance for narcoleptic patients compared with controls, and that sodium oxybate was associated with an improvement of sustained attention and a better resistance to sleep. © 2016 European Sleep Research Society.

  20. Maintenance as a safety issue.

    PubMed

    White, Jim

    2008-11-01

    Because safety is related to electrical power systems maintenance, it seems reasonable to assume there could be legal issues if maintenance is not performed. OSHA has not yet taken the stand that not performing maintenance as required by the manufacturer, NFPA 70B, or ANSI/NETA MTS-07 constitutes a willful violation. OSHA defines a willful citation as one where: "the employer knowingly commits with plain indifference to the law. The employer either knows that what he or she is doing constitutes a violation, or is aware that a hazardous condition existed and made no reasonable effort to eliminate it". However, NFPA 70E 2009 requires this maintenance, and OSHA has stated on its Web site that NFPA 70E is "a guide for meeting the requirements of the OSHA electrical regulations". In addition, federal courts have found that NFPA 70E is "standard industry practice." Once a company receives and accepts a willful citation, especially if received as the result of an accident investigation, its worker's compensation protection no longer shields it. One definition given by a trial attorney for a willful citation was that it is equal to negligent behavior. Be smart: Maintain that equipment and save yourself major problems, including unscheduled shutdowns and possible litigation.

  1. 23 CFR 140.918 - Maintenance and extended construction.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Maintenance and extended construction. 140.918 Section... REIMBURSEMENT Reimbursement for Railroad Work § 140.918 Maintenance and extended construction. The cost of maintenance and extended construction is reimbursable to the extent provided for in 23 CFR 646.216(f)(4), and...

  2. 23 CFR 140.918 - Maintenance and extended construction.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Maintenance and extended construction. 140.918 Section... REIMBURSEMENT Reimbursement for Railroad Work § 140.918 Maintenance and extended construction. The cost of maintenance and extended construction is reimbursable to the extent provided for in 23 CFR 646.216(f)(4), and...

  3. 23 CFR 140.918 - Maintenance and extended construction.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Maintenance and extended construction. 140.918 Section... REIMBURSEMENT Reimbursement for Railroad Work § 140.918 Maintenance and extended construction. The cost of maintenance and extended construction is reimbursable to the extent provided for in 23 CFR 646.216(f)(4), and...

  4. 23 CFR 140.918 - Maintenance and extended construction.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Maintenance and extended construction. 140.918 Section... REIMBURSEMENT Reimbursement for Railroad Work § 140.918 Maintenance and extended construction. The cost of maintenance and extended construction is reimbursable to the extent provided for in 23 CFR 646.216(f)(4), and...

  5. 23 CFR 140.918 - Maintenance and extended construction.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Maintenance and extended construction. 140.918 Section... REIMBURSEMENT Reimbursement for Railroad Work § 140.918 Maintenance and extended construction. The cost of maintenance and extended construction is reimbursable to the extent provided for in 23 CFR 646.216(f)(4), and...

  6. Mixed waste landfill corrective measures study final report Sandia National Laboratories, Albuquerque, New Mexico.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peace, Gerald; Goering, Timothy James

    2004-03-01

    The Mixed Waste Landfill occupies 2.6 acres in the north-central portion of Technical Area 3 at Sandia National Laboratories, Albuquerque, New Mexico. The landfill accepted low-level radioactive and mixed waste from March 1959 to December 1988. This report represents the Corrective Measures Study that has been conducted for the Mixed Waste Landfill. The purpose of the study was to identify, develop, and evaluate corrective measures alternatives and recommend the corrective measure(s) to be taken at the site. Based upon detailed evaluation and risk assessment using guidance provided by the U.S. Environmental Protection Agency and the New Mexico Environment Department, themore » U.S. Department of Energy and Sandia National Laboratories recommend that a vegetative soil cover be deployed as the preferred corrective measure for the Mixed Waste Landfill. The cover would be of sufficient thickness to store precipitation, minimize infiltration and deep percolation, support a healthy vegetative community, and perform with minimal maintenance by emulating the natural analogue ecosystem. There would be no intrusive remedial activities at the site and therefore no potential for exposure to the waste. This alternative poses minimal risk to site workers implementing institutional controls associated with long-term environmental monitoring as well as routine maintenance and surveillance of the site.« less

  7. Survey points to practices that reduce refinery maintenance spending

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ricketts, R.

    During the past decade, Solomon Associates Inc., Dallas, has conducted several comparative analyses of maintenance costs in the refining industry. These investigations have brought to light maintenance practices and reliability improvement activities that are responsible for the wide range of maintenance costs recorded by refineries. Some of the practices are of an organizational nature and thus are of interest to managers reviewing their operations. The paper discusses maintenance costs; profitability; cost trends; equipment availability; funds application; two basic organizational approached to maintenance (repair-focused organization and reliability-focused organization); low-cost practices; and organizational style.

  8. The Effect of Line Maintenance Activity on Airline Safety Quality

    NASA Technical Reports Server (NTRS)

    Rhoades, Dawna L.; Reynolds, Rosemarie; Waguespack, Blaise, Jr.; Williams, Michael

    2005-01-01

    One of the arguments against deregulation of the airline industry has been the possibility that financially troubled carriers would be tempted to lower line maintenance spending, thus lowering maintenance quality and decreasing the overall safety of the carrier. Given the financial crisis triggered by the events of 9/11: it appears to be a good time to revisit this issue. This paper examines the quality of airline line maintenance activity and examines the impact of maintenance spending on maintenance quality and overall safety. Findings indicate that increased maintenance spending is associated with increased line maintenance activity and increased overall safety quality for the major U.S. carriers.

  9. TVIS Inflight Maintenance

    NASA Image and Video Library

    2011-07-01

    ISS028-E-013757 (1 July 2011) --- Russian cosmonaut Andrey Borisenko, Expedition 28 commander, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  10. 40 CFR 1042.125 - Maintenance instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... those engines from in-use testing or deny a warranty claim. Do not take these maintenance steps during... maintenance steps during service accumulation on your emission-data engines, as long as they are reasonable... CONTROLS CONTROL OF EMISSIONS FROM NEW AND IN-USE MARINE COMPRESSION-IGNITION ENGINES AND VESSELS Emission...

  11. 14 CFR 125.247 - Inspection programs and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance § 125.247 Inspection programs and maintenance. (a) No person may operate an airplane subject to this part unless (1... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Inspection programs and maintenance. 125...

  12. 14 CFR 125.247 - Inspection programs and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance § 125.247 Inspection programs and maintenance. (a) No person may operate an airplane subject to this part unless (1... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Inspection programs and maintenance. 125...

  13. 14 CFR 125.247 - Inspection programs and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance § 125.247 Inspection programs and maintenance. (a) No person may operate an airplane subject to this part unless (1... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Inspection programs and maintenance. 125...

  14. 14 CFR 125.247 - Inspection programs and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance § 125.247 Inspection programs and maintenance. (a) No person may operate an airplane subject to this part unless (1... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Inspection programs and maintenance. 125...

  15. 14 CFR 125.247 - Inspection programs and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance § 125.247 Inspection programs and maintenance. (a) No person may operate an airplane subject to this part unless (1... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Inspection programs and maintenance. 125...

  16. Definition of experiments and instruments for a communication/navigation research laboratory. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1972-01-01

    This study was undertaken to develop conceptual designs for a manned, space shuttle sortie mission laboratory capable of supporting a wide variety of experiments in conjunction with communications and navigation research. This space/laboratory would be one in which man may effectively increase experiment efficiency by certain observations, modifications, setup, calibration, and limited maintenance steps. In addition, man may monitor experiment progress and perform preliminary data evaluation to verify proper equipment functioning and may terminate or redirect experiments to obtain the most desirable end results. The flexibility and unique capabilities of man as an experimenter in such a laboratory will add greatly to the simplification of space experiments and this provides the basis for commonality in many of the supportive subsystems, thus reaping the benefits of reusability and reduced experiment costs. For Vol. 4, see N73-19268.

  17. Road Maintenance in Africa: Approaches and Perspectives

    NASA Astrophysics Data System (ADS)

    M, Mostafa Hassan

    2018-06-01

    In Africa, roads are the dominant mode of passenger and freight transport, for which the need is growing rapidly. It is noticeable that most of the African countries do not do enough to ensure the sustainability of road infrastructure as it has been widely reported that roads are affected, to varying degrees, by premature deterioration. Most of the African countries have adopted institutional reforms, notably entailing the creation of road funds and road agencies, and made significant progress on road maintenance. However, many challenges remain to be addressed in all of them to ensure appropriate maintenance. Although spending on road maintenance has increased over time in all African countries it remains insufficient to cover the needs. Poorly maintained roads constrain mobility, significantly raise vehicle operating costs, increase accident rates and their associated human and property costs, and aggravate isolation, poverty, poor health, and illiteracy in rural communities. This paper focuses, in particular, on road maintenance in some African countries considering types of road maintenance and the different approaches aiming at a comparison to reflect on similarities and differences.

  18. Maintenance manager's manual for small transit agencies. Special report 1985-1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fowler, W.

    1988-03-01

    This publication contains information to assist operators of transit agencies providing public transportation in rural and smaller urban areas to better manage their vehicle maintenance programs. The report includes discussions of maintenance management, maintenance programs preventive maintenance, recordkeeping, selection of type of maintenance operation, in-house maintenance, and maintenance practices. Also included are appendixes giving supplementary information about tire loads; lubrication oil; mechanic hand tools; shop tools; mechanic aptitude tests; technical training resources; maintenance management training resources; and lists of manufacturers of air-conditioning systems, wheelchair lifts and wheelchair ramps.

  19. Outcomes associated with intradialytic oral nutritional supplements in patients undergoing maintenance hemodialysis: a quality improvement report.

    PubMed

    Lacson, Eduardo; Wang, Weiling; Zebrowski, Barbara; Wingard, Rebecca; Hakim, Raymond M

    2012-10-01

    Insufficient clinical data exist to determine whether provision of oral nutritional supplements during dialysis can improve survival in hypoalbuminemic maintenance hemodialysis patients. Retrospective matched-cohort study. All oral nutritional supplement program-eligible in-center maintenance hemodialysis patients with albumin level ≤3.5 g/dL in quarter 4 of 2009 without oral nutritional supplements in the prior 90 days at Fresenius Medical Care, North America facilities. Monitored intradialytic oral nutritional supplements were provided to eligible maintenance hemodialysis patients upon physician order, to continue for a year or until serum albumin level was ≥4.0 g/dL. Mortality (including deaths and withdrawals), followed up until December 31, 2010. Both an intention-to-treat (ITT) and an as-treated analysis was performed using a 1:1 geographic region and propensity score-matched study population (using case-mix, laboratory test, access type, 30-day prior hospitalization, and incident patient status) comparing patients treated with intradialytic oral nutritional supplements with usual-care patients. Cox models were constructed, unadjusted and adjusted for facility standardized mortality ratio and case-mix and laboratory variables. The ITT and as-treated analyses both showed lower mortality in the oral nutritional supplement group. The conservative ITT models with 5,227 matched pairs had 40% of controls subsequently receiving oral nutritional supplements after January 1, 2010 (because many physicians delayed participation), with comparative death rates of 30.1% versus 30.4%. The corresponding as-treated (excluding crossovers) death rates for 4,289 matched pairs were 30.9% versus 37.3%. The unadjusted ITT mortality HR for oral nutritional supplement use was 0.95 (95% CI, 0.88-1.01), and the adjusted HR was 0.91 (95% CI, 0.85-0.98); the corresponding as-treated HRs were 0.71 (95% CI, 0.66-0.76) and 0.66 (95% CI, 0.61-0.71) before and after adjustment

  20. Study of turboprop systems reliability and maintenance costs

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The overall reliability and maintenance costs (R&MC's) of past and current turboprop systems were examined. Maintenance cost drivers were found to be scheduled overhaul (40%), lack of modularity particularly in the propeller and reduction gearbox, and lack of inherent durability (reliability) of some parts. Comparisons were made between the 501-D13/54H60 turboprop system and the widely used JT8D turbofan. It was found that the total maintenance cost per flight hour of the turboprop was 75% higher than that of the JT8D turbofan. Part of this difference was due to propeller and gearbox costs being higher than those of the fan and reverser, but most of the difference was in the engine core where the older technology turboprop core maintenance costs were nearly 70 percent higher than for the turbofan. The estimated maintenance cost of both the advanced turboprop and advanced turbofan were less than the JT8D. The conclusion was that an advanced turboprop and an advanced turbofan, using similar cores, will have very competitive maintenance costs per flight hour.

  1. Development of ergonomics audits for bagging, haul truck and maintenance and repair operations in mining.

    PubMed

    Dempsey, Patrick G; Pollard, Jonisha; Porter, William L; Mayton, Alan; Heberger, John R; Gallagher, Sean; Reardon, Leanna; Drury, Colin G

    2017-12-01

    The development and testing of ergonomics and safety audits for small and bulk bag filling, haul truck and maintenance and repair operations in coal preparation and mineral processing plants found at surface mine sites is described. The content for the audits was derived from diverse sources of information on ergonomics and safety deficiencies including: analysis of injury, illness and fatality data and reports; task analysis; empirical laboratory studies of particular tasks; field studies and observations at mine sites; and maintenance records. These diverse sources of information were utilised to establish construct validity of the modular audits that were developed for use by mine safety personnel. User and interrater reliability testing was carried out prior to finalising the audits. The audits can be implemented using downloadable paper versions or with a free mobile NIOSH-developed Android application called ErgoMine. Practitioner Summary: The methodology used to develop ergonomics audits for three types of mining operations is described. Various sources of audit content are compared and contrasted to serve as a guide for developing ergonomics audits for other occupational contexts.

  2. Cost of gentamicin assays carried out by microbiology laboratories.

    PubMed Central

    Vacani, P F; Malek, M M; Davey, P G

    1993-01-01

    AIMS--To assess the current range of prices charged for gentamicin assays in United Kingdom laboratories; and to examine the laboratories' likely response to increases or decreases in the demand for the service. METHODS--A postal survey of the 420 members of the Association of Medical Microbiologists was used to establish the range of prices charged for aminoglycoside assays. Additionally, eight private institutions were contacted to determine what the private sector was charging for aminoglycoside assays. Reagent costs in the NHS laboratories were calculated by dividing the total cost of all aminoglycoside assay kits by the number of samples analysed. RESULTS--The NHS and the private institutions both showed a wide price variation. Prices charged to an in-hospital requester for a peak and trough assay ranged from 5.00 pounds to 68.20 pounds (n = 44), and to an external private hospital, under a bulk service contract, from 5.00 pounds to 96.00 pounds (n = 47). Prices charged by private laboratories ranged from 49.00 pounds to 84.00 pounds (n = 8). There was a log linear correlation in the NHS laboratories between the reagent costs per assay and the number of assays performed per year, and most laboratories thought that their price per assay would be sensitive to increases or decreases in demand. Laboratories which had purchased their assay machines had lower reagent costs per assay but higher repair and maintenance costs. Overall, number of assays performed and method of payment for assay machinery only accounted for 44.8% of the observed variation in assay kit costs. CONCLUSIONS--The price range for gentamicin assays in the United Kingdom is wide and is only partially explained by the number of assays performed. Most laboratories believe that they would experience a reduction in unit cost as output increases. The currently offered range of prices is, in part, due to variation in the laboratories' approach to costing the service provided and some laboratories

  3. Maintenance and operations decision support tool : Clarus regional demonstrations.

    DOT National Transportation Integrated Search

    2011-01-01

    Weather affects almost all maintenance activity decisions. The Federal Highway Administration (FHWA) tested a new decision support system for maintenance in Iowa, Indiana, and Illinois called the Maintenance and Operations Decision Support System (MO...

  4. Maintenance practices for stormwater runoff - phase 2.

    DOT National Transportation Integrated Search

    2015-04-01

    Seven wet detention ponds possessing severe maintenance issues were selected from disparate FDOT : districts. The maintenance problems ranged from excess littoral zone growth and intense algal blooms : to bank erosion and sediment accumulation. Inten...

  5. Building laboratory capacity to support HIV care in Nigeria: Harvard/APIN PEPFAR, 2004–2012

    PubMed Central

    Hamel, Donald J.; Sankalé, Jean-Louis; Samuels, Jay Osi; Sarr, Abdoulaye D.; Chaplin, Beth; Ofuche, Eke; Meloni, Seema T.; Okonkwo, Prosper; Kanki, Phyllis J.

    2015-01-01

    Introduction From 2004–2012, the Harvard/AIDS Prevention Initiative in Nigeria, funded through the US President’s Emergency Plan for AIDS Relief programme, scaled up HIV care and treatment services in Nigeria. We describe the methodologies and collaborative processes developed to improve laboratory capacity significantly in a resource-limited setting. These methods were implemented at 35 clinic and laboratory locations. Methods Systems were established and modified to optimise numerous laboratory processes. These included strategies for clinic selection and management, equipment and reagent procurement, supply chains, laboratory renovations, equipment maintenance, electronic data management, quality development programmes and trainings. Results Over the eight-year programme, laboratories supported 160 000 patients receiving HIV care in Nigeria, delivering over 2.5 million test results, including regular viral load quantitation. External quality assurance systems were established for CD4+ cell count enumeration, blood chemistries and viral load monitoring. Laboratory equipment platforms were improved and standardised and use of point-of-care analysers was expanded. Laboratory training workshops supported laboratories toward increasing staff skills and improving overall quality. Participation in a World Health Organisation-led African laboratory quality improvement system resulted in significant gains in quality measures at five laboratories. Conclusions Targeted implementation of laboratory development processes, during simultaneous scale-up of HIV treatment programmes in a resource-limited setting, can elicit meaningful gains in laboratory quality and capacity. Systems to improve the physical laboratory environment, develop laboratory staff, create improvements to reduce costs and increase quality are available for future health and laboratory strengthening programmes. We hope that the strategies employed may inform and encourage the development of other

  6. Human factors in aviation maintenance, phase 1 : progress report.

    DOT National Transportation Integrated Search

    1991-11-01

    This human factors research in aviation maintenance addresses four tasks including studies of organizational behavior, job and task analysis in maintenance and inspection, advanced technology for training, and the application of job aiding to mainten...

  7. The snowmaker: nature identical snow production in the laboratory

    NASA Astrophysics Data System (ADS)

    Schleef, S.; Jaggi, M.; Loewe, H.; Schneebeli, M.

    2013-12-01

    Using natural snow for laboratory experiments can be tricky due to shortage of winter periods and snowfall, difficulties of sample casting and transport, and the great variability of natural snow due to the varying conditions of crystal growth in the clouds. This hinders repeatable laboratory experiments with reproducible specimen and microstructural characteristics. To minimize experimental uncertainties we designed an improved machine called snowmaker, which enables us to produce nature-identical snow in a cold laboratory under well defined conditions. The snowmaker is based on well-known principles: warm humid air from a heated water basin is advected into a cold nucleation chamber where the vapor resublimates on stretched Nylon wires. Crystals are automatically harvested by a motor driven brush rack and collected in a box, thereby several kilograms of snow can be produced per day with minimum maintenance. The excess vapor is collected in a moisture trap to avoid frost in the laboratory. The entire construction is designed as a rolling, modular assembly system which can easily carried out of the laboratory for defrosting. In addition to previous attempts we focus on the reproducibility of the samples and the comparison to natural snow down to the microscale. We show that the settings of water temperature and cold laboratory temperature facilitates the production of different crystal shapes like dendrites and needles in a reproducible way. Besides photography, we analyzed the microstructure of snowmaker crystals in aggregated specimen by X-ray microtomography. Depending on the settings we can create reproducible samples with density of 50-170 kg/m3 and specific surface areas of 50-80 mm-1. We briefly touch similarities between artificial and natural snow samples with respect to crystal habit, microstructural parameters and short-time metamorphism.

  8. Fleet equipment performance measure preventive maintenance model.

    DOT National Transportation Integrated Search

    2013-02-28

    The Texas Department of Transportation : (TxDOT) operates a large fleet of on-road and : off-road equipment. Consequently, fleet : maintenance procedures (specifically preventive : maintenance such as oil changes) represent a : significant cost to th...

  9. Maintenance Policy in Public-Transport Involving Government Subsidy

    NASA Astrophysics Data System (ADS)

    Pasaribu, U. S.; Bayuzetra, Y.; Gunawan, L. E.; Husniah, H.

    2018-02-01

    A public transport with government subsidy is considered to encourage the sustainability of the transportation. The transportations revenue is determined by the maximum of the uptimes of the vehicle. In this paper, we study a one-dimensional maintenance policy for new vehicle which is characterized by age parameter. We consider that the degradation of the vehicle is affected by the age of the vehicle, and modelled by using a one-dimensional approach. The owner performs both preventive and corrective maintenance actions, and the preventive maintenance action will reduce the vehicle failure rate and hence it will decrease the corrective maintenance cost during the life time of the vehicle. The decision problem for the owner is to find the optimal preventive maintenance time of the vehicle of each subsidy option offered by maximizing the expected profit for each subsidy.

  10. Flight control electronics reliability/maintenance study

    NASA Technical Reports Server (NTRS)

    Dade, W. W.; Edwards, R. H.; Katt, G. T.; Mcclellan, K. L.; Shomber, H. A.

    1977-01-01

    Collection and analysis of data are reported that concern the reliability and maintenance experience of flight control system electronics currently in use on passenger carrying jet aircraft. Two airlines B-747 airplane fleets were analyzed to assess the component reliability, system functional reliability, and achieved availability of the CAT II configuration flight control system. Also assessed were the costs generated by this system in the categories of spare equipment, schedule irregularity, and line and shop maintenance. The results indicate that although there is a marked difference in the geographic location and route pattern between the airlines studied, there is a close similarity in the reliability and the maintenance costs associated with the flight control electronics.

  11. Railroad decision support tools for track maintenance.

    DOT National Transportation Integrated Search

    2016-01-01

    North American railroads spend billions of dollars each year on track maintenance. With : expenditures of this level, incremental improvements in planning or execution of maintenance projects can result in either substantial savings or the ability to...

  12. Maintenance program decision-making utilizing crash data.

    DOT National Transportation Integrated Search

    2013-07-01

    This document describes methods that may be used by UDOT Maintenance personnel to improve highway safety. Four programs have been recommended using crash data to make more informed decisions concerning maintenance programs as follows: : Snow & Ic...

  13. Maintenance Audit through Value Analysis Technique: A Case Study

    NASA Astrophysics Data System (ADS)

    Carnero, M. C.; Delgado, S.

    2008-11-01

    The increase in competitiveness, technological changes and the increase in the requirements of quality and service have forced a change in the design and application of maintenance, as well as the way in which it is considered within the managerial strategy. There are numerous maintenance activities that must be developed in a service company. As a result the maintenance functions as a whole have to be outsourced. Nevertheless, delegating this subject to specialized personnel does not exempt the company from responsibilities, but rather leads to the need for control of each maintenance activity. In order to achieve this control and to evaluate the efficiency and effectiveness of the company it is essential to carry out an audit that diagnoses the problems that could develop. In this paper a maintenance audit applied to a service company is developed. The methodology applied is based on the expert systems. The expert system by means of rules uses the weighting technique SMART and value analysis to obtain the weighting between the decision functions and between the alternatives. The expert system applies numerous rules and relations between different variables associated with the specific maintenance functions, to obtain the maintenance state by sections and the general maintenance state of the enterprise. The contributions of this paper are related to the development of a maintenance audit in a service enterprise, in which maintenance is not generally considered a strategic subject and to the integration of decision-making tools such as the weighting technique SMART with value analysis techniques, typical in the design of new products, in the area of the rule-based expert systems.

  14. Impact of System Expansion on Maintenance Resources.

    DOT National Transportation Integrated Search

    2012-09-01

    The basic focus of this research project is developing a marginal maintenance cost mechanism for new construction projects. This mechanism will identify the total expected short-term and long-term maintenance burden required for each construction pro...

  15. Best practices handbook on asphalt pavement maintenance

    DOT National Transportation Integrated Search

    2000-02-01

    The purpose of this handbook is to provide background information about the importance of pavement preservation and preventive maintenance, as well as present maintenance techniques for a variety of distresses and conditions. The major focus of this ...

  16. Failure: A Source of Progress in Maintenance and Design

    NASA Astrophysics Data System (ADS)

    Chaïb, R.; Taleb, M.; Benidir, M.; Verzea, I.; Bellaouar, A.

    This approach, allows using the failure as a source of progress in maintenance and design to detect the most critical components in equipment, to determine the priority order maintenance actions to lead and direct the exploitation procedure towards the most penalizing links in this equipment, even define the necessary changes and recommendations for future improvement. Thus, appreciate the pathological behaviour of the material and increase its availability, even increase its lifespan and improve its future design. In this context and in the light of these points, the failures are important in managing the maintenance function. Indeed, it has become important to understand the phenomena of failure and degradation of equipments in order to establish an appropriate maintenance policy for the rational use of mechanical components and move to the practice of proactive maintenance [1], do maintenance at the design [2].

  17. Project development laboratories energy fuels and oils based on NRU “MPEI”

    NASA Astrophysics Data System (ADS)

    Burakov, I. A.; Burakov, A. Y.; Nikitina, I. S.; Khomenkov, A. M.; Paramonova, A. O.; Khtoo Naing, Aung

    2017-11-01

    In the process of improving the efficiency of power plants a hot topic is the use of high-quality fuels and lubricants. In the process of transportation, preparation for use, storage and maintenance of the properties of fuels and lubricants may deteriorate, which entails a reduction in the efficiency of power plants. One of the ways to prevent the deterioration of the properties is a timely analysis of the relevant laboratories. In this day, the existence of laboratories of energy fuels and energy laboratory oil at thermal power stations is satisfactory character. However, the training of qualified personnel to work in these laboratories is a serious problem, as the lack of opportunities in these laboratories a complete list of required tests. The solution to this problem is to explore the possibility of application of methods of analysis of the properties of fuels and lubricants in the stage of training and re-training of qualified personnel. In this regard, on the basis of MPEI developed laboratory projects of solid, liquid and gaseous fuels, power and energy oils and lubricants. Projects allow for a complete list of tests required for the timely control of properties and prevent the deterioration of these properties. Assess the financial component of the implementation of the developed projects based on the use of modern equipment used for tests. Projects allow for a complete list of tests required for the timely control of properties and prevent the deterioration of these properties.

  18. Research requirements to reduce maintenance costs of civil helicopters

    NASA Technical Reports Server (NTRS)

    Million, D. J.; Waters, K. T.

    1978-01-01

    The maintenance problems faced by the operators of civil helicopters that result in high costs are documented. Existing technology that can be applied to reduce maintenance costs and research that should be carried out were identified. Good design practice and application of existing technology were described as having a significant impact on reducing maintenance costs immediately. The research and development that have potential for long range reduction of maintenance costs are presented.

  19. Product modular design incorporating preventive maintenance issues

    NASA Astrophysics Data System (ADS)

    Gao, Yicong; Feng, Yixiong; Tan, Jianrong

    2016-03-01

    Traditional modular design methods lead to product maintenance problems, because the module form of a system is created according to either the function requirements or the manufacturing considerations. For solving these problems, a new modular design method is proposed with the considerations of not only the traditional function related attributes, but also the maintenance related ones. First, modularity parameters and modularity scenarios for product modularity are defined. Then the reliability and economic assessment models of product modularity strategies are formulated with the introduction of the effective working age of modules. A mathematical model used to evaluate the difference among the modules of the product so that the optimal module of the product can be established. After that, a multi-objective optimization problem based on metrics for preventive maintenance interval different degrees and preventive maintenance economics is formulated for modular optimization. Multi-objective GA is utilized to rapidly approximate the Pareto set of optimal modularity strategy trade-offs between preventive maintenance cost and preventive maintenance interval difference degree. Finally, a coordinate CNC boring machine is adopted to depict the process of product modularity. In addition, two factorial design experiments based on the modularity parameters are constructed and analyzed. These experiments investigate the impacts of these parameters on the optimal modularity strategies and the structure of module. The research proposes a new modular design method, which may help to improve the maintainability of product in modular design.

  20. Determining optimal approaches for weight maintenance: a randomized controlled trial

    PubMed Central

    Dale, Kelly S.; McAuley, Kirsten A.; Taylor, Rachael W.; Williams, Sheila M.; Farmer, Victoria L.; Hansen, Paul; Vorgers, Sue M.; Chisholm, Alexandra W.; Mann, Jim I.

    2009-01-01

    Background Weight regain often occurs after weight loss in overweight individuals. We aimed to compare the effectiveness of 2 support programs and 2 diets of different macronutrient compositions intended to facilitate long-term weight maintenance. Methods Using a 2 × 2 factorial design, we randomly assigned 200 women who had lost 5% or more of their initial body weight to an intensive support program (implemented by nutrition and activity specialists) or to an inexpensive nurse-led program (involving “weigh-ins” and encouragement) that included advice about high-carbohydrate diets or relatively high-monounsaturated-fat diets. Results In total, 174 (87%) participants were followed-up for 2 years. The average weight loss (about 2 kg) did not differ between those in the support programs (0.1 kg, 95% confidence interval [CI] −1.8 to 1.9, p = 0.95) or diets (0.7 kg, 95% CI −1.1 to 2.4, p = 0.46). Total and low-density lipoprotein (LDL) cholesterol levels were significantly higher among those on the high-monounsaturated-fat diet (total cholesterol: 0.17 mmol/L, 95% CI 0.01 to 0.33; p = 0.040; LDL cholesterol: 0.16 mmol/L, 95% CI 0.01 to 0.31; p = 0.039) than among those on the high-carbohydrate diet. Those on the high-monounsaturated-fat diet also had significantly higher intakes of total fat (5% total energy, 95% CI 3% to 6%, p < 0.001) and saturated fat (2% total energy, 95% CI 1% to 2%, p < 0.001). All of the other clinical and laboratory measures were similar among those in the support programs and diets. Interpretation A relatively inexpensive program involving nurse support is as effective as a more resource-intensive program for weight maintenance over a 2-year period. Diets of different macronutrient composition produced comparable beneficial effects in terms of weight loss maintenance. ClinicalTrials.gov trial register no. NCT00128336. PMID:19433812

  1. Development of a maintenance cost index : final project report.

    DOT National Transportation Integrated Search

    2016-08-15

    Maintenance activities account for a substantial portion of the life cycle costs of a roadway and are categorized by means of performance: contract maintenance by outside forces or in-house maintenance by DOT personnel and equipment. The nature and t...

  2. Operation and maintenance results from ISFOC CPV plants

    NASA Astrophysics Data System (ADS)

    Gil, Eduardo; Martinez, María; de la Rubia, Oscar

    2017-09-01

    The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.

  3. Crew interface specifications development for inflight maintenance and stowage functions

    NASA Technical Reports Server (NTRS)

    Carl, J. G.

    1974-01-01

    Findings and data products developed during crew specification study for inflight maintenance and stowage functions are reported. From this information base, a family of data concepts to support crew inflight troubleshooting and corrective maintenance activities was developed and specified. Recommendations are made for the improvement of inflight maintenance planning, preparations and operations in future space flight programs through the establishment of an inflight maintenance organization and specific suggestions for techniques to improve the management of the inflight maintenance function.

  4. Augmented reality application utility for aviation maintenance work instruction

    NASA Astrophysics Data System (ADS)

    Pourcho, John Bryan

    Current aviation maintenance work instructions do not display information effectively enough to prevent costly errors and safety concerns. Aircraft are complex assemblies of highly interrelated components that confound troubleshooting and can make the maintenance procedure difficult (Drury & Gramopadhye, 2001). The sophisticated nature of aircraft maintenance necessitates a revolutionized training intervention for aviation maintenance technicians (United States General Accounting Office, 2003). Quite simply, the paper based job task cards fall short of offering rapid access to technical data and the system or component visualization necessary for working on complex integrated aircraft systems. Possible solutions to this problem include upgraded standards for paper based task cards and the use of integrated 3D product definition used on various mobile platforms (Ropp, Thomas, Lee, Broyles, Lewin, Andreychek, & Nicol, 2013). Previous studies have shown that incorporation of 3D graphics in work instructions allow the user to more efficiently and accurately interpret maintenance information (Jackson & Batstone, 2008). For aircraft maintenance workers, the use of mobile 3D model-based task cards could make current paper task card standards obsolete with their ability to deliver relevant, synchronized information to and from the hangar. Unlike previous versions of 3D model-based definition task cards and paper task cards, which are currently used in the maintenance industry, 3D model based definition task cards have the potential to be more mobile and accessible. Utilizing augmented reality applications on mobile devices to seamlessly deliver 3D product definition on mobile devices could increase the efficiency, accuracy, and reduce the mental workload for technicians when performing maintenance tasks (Macchiarella, 2004). This proposal will serve as a literary review of the aviation maintenance industry, the spatial ability of maintenance technicians, and benefits of

  5. A randomized controlled trial of interim methadone maintenance.

    PubMed

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (P<.001). Overall, in the past 30 days at follow-up, interim participants reported significantly fewer days of heroin use (P<.001), had a significant reduction in heroin-positive drug test results (P<.001), reported spending less money on drugs (P<.001), and received less illegal income (P<.02) than the waiting list participants. Interim methadone maintenance results in a

  6. [STRATEGY OF USE AND MAINTENANCE OF CLINICAL HOSPITAL CENTER RIJEKA IN ACCORDANCE WITH KEY PERFORMANCE INDICATORS FOR STRATEGIC HEALTHCARE FACILITIES MAINTENANCE].

    PubMed

    Sjekavica, Mariela; Haller, Herman; Cerić, Anita

    2015-01-01

    Building usage is the phase in the building life cycle that is most time-consuming, most functional, most significant due to building purpose and often systematically ignored. Maintenance is the set of activities that ensure the planned duration of facility exploitation phase in accordance with the requirements for quality maintenance of a large number of important building features as well as other elements immanent to the nature of facilities' life. The aim of the study is to show the analysis of the current state of organized, planned and comprehensive managerial approach in hospital utilization and maintenance in the Republic of Croatia, given on the case study of Clinical hospital center in Rijeka. The methodology used consists of relevant literature section of theory of facility utilization, maintenance and management in general, hospital buildings especially, display of practice on case study, and comparison of key performance indicators values obtained through interview with those that author Igal M. Shohet defined in his study by field surveys and statistical analyses. Despite many positive indicators of Clinical hospital center Rijeka maintenance, an additional research is needed in order to define a more complete national hospital maintenance strategy.

  7. Maintenance Performance System (Organizational). Operating Manual Maintenance Management Information System for Division 86

    DTIC Science & Technology

    1984-01-01

    performance, diagnosing performance problems, taking corrective actions, and providing training. This report provides instructions for operating the maintenance management information system of MPS-O.

  8. 30 CFR 57.14105 - Procedures during repairs or maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14105 Procedures during repairs or maintenance. Repairs or maintenance on machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment...

  9. 30 CFR 57.14105 - Procedures during repairs or maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14105 Procedures during repairs or maintenance. Repairs or maintenance on machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment...

  10. 30 CFR 57.14105 - Procedures during repairs or maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14105 Procedures during repairs or maintenance. Repairs or maintenance on machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment...

  11. 30 CFR 57.14105 - Procedures during repairs or maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14105 Procedures during repairs or maintenance. Repairs or maintenance on machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment...

  12. 30 CFR 57.14105 - Procedures during repairs or maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14105 Procedures during repairs or maintenance. Repairs or maintenance on machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment...

  13. 7 CFR 654.15 - Operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Operation and maintenance. 654.15 Section 654.15 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects...

  14. 7 CFR 654.15 - Operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Operation and maintenance. 654.15 Section 654.15 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects...

  15. 7 CFR 654.15 - Operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Operation and maintenance. 654.15 Section 654.15 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects...

  16. 49 CFR 583.16 - Maintenance of records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Maintenance of records. 583.16 Section 583.16 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AUTOMOBILE PARTS CONTENT LABELING § 583.16 Maintenance...

  17. 49 CFR 583.16 - Maintenance of records.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Maintenance of records. 583.16 Section 583.16 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AUTOMOBILE PARTS CONTENT LABELING § 583.16 Maintenance...

  18. 49 CFR 583.16 - Maintenance of records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Maintenance of records. 583.16 Section 583.16 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AUTOMOBILE PARTS CONTENT LABELING § 583.16 Maintenance...

  19. 49 CFR 583.16 - Maintenance of records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Maintenance of records. 583.16 Section 583.16 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AUTOMOBILE PARTS CONTENT LABELING § 583.16 Maintenance...

  20. 40 CFR 1033.220 - Amending maintenance instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that could affect emissions. In your request, describe the proposed changes to the maintenance... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Amending maintenance instructions. 1033.220 Section 1033.220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  1. Quality management and accreditation in a mixed research and clinical hair testing analytical laboratory setting-a review.

    PubMed

    Fulga, Netta

    2013-06-01

    Quality management and accreditation in the analytical laboratory setting are developing rapidly and becoming the standard worldwide. Quality management refers to all the activities used by organizations to ensure product or service consistency. Accreditation is a formal recognition by an authoritative regulatory body that a laboratory is competent to perform examinations and report results. The Motherisk Drug Testing Laboratory is licensed to operate at the Hospital for Sick Children in Toronto, Ontario. The laboratory performs toxicology tests of hair and meconium samples for research and clinical purposes. Most of the samples are involved in a chain of custody cases. Establishing a quality management system and achieving accreditation became mandatory by legislation for all Ontario clinical laboratories since 2003. The Ontario Laboratory Accreditation program is based on International Organization for Standardization 15189-Medical laboratories-Particular requirements for quality and competence, an international standard that has been adopted as a national standard in Canada. The implementation of a quality management system involves management commitment, planning and staff education, documentation of the system, validation of processes, and assessment against the requirements. The maintenance of a quality management system requires control and monitoring of the entire laboratory path of workflow. The process of transformation of a research/clinical laboratory into an accredited laboratory, and the benefits of maintaining an effective quality management system, are presented in this article.

  2. A quantitative comparison of corrective and perfective maintenance

    NASA Technical Reports Server (NTRS)

    Henry, Joel; Cain, James

    1994-01-01

    This paper presents a quantitative comparison of corrective and perfective software maintenance activities. The comparison utilizes basic data collected throughout the maintenance process. The data collected are extensive and allow the impact of both types of maintenance to be quantitatively evaluated and compared. Basic statistical techniques test relationships between and among process and product data. The results show interesting similarities and important differences in both process and product characteristics.

  3. 30 CFR 56.14105 - Procedures during repairs or maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14105 Procedures during repairs or maintenance. Repairs or maintenance of machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment motion or...

  4. 30 CFR 56.14105 - Procedures during repairs or maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14105 Procedures during repairs or maintenance. Repairs or maintenance of machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment motion or...

  5. 30 CFR 56.14105 - Procedures during repairs or maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14105 Procedures during repairs or maintenance. Repairs or maintenance of machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment motion or...

  6. 30 CFR 56.14105 - Procedures during repairs or maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14105 Procedures during repairs or maintenance. Repairs or maintenance of machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment motion or...

  7. 30 CFR 56.14105 - Procedures during repairs or maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14105 Procedures during repairs or maintenance. Repairs or maintenance of machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment motion or...

  8. 14 CFR 91.1433 - CAMP: Maintenance and preventive maintenance training program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1433 CAMP: Maintenance and preventive... each person (including inspection personnel) who determines the adequacy of work done is fully informed...

  9. 40 CFR 89.109 - Maintenance instructions and minimum allowable maintenance intervals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... change, oil filter change, fuel filter change, air filter change, cooling system maintenance, adjustment... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION...) Exhaust gas recirculation system-related filters and coolers. (ii) Positive crankcase ventilation valve...

  10. 40 CFR 89.109 - Maintenance instructions and minimum allowable maintenance intervals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... change, oil filter change, fuel filter change, air filter change, cooling system maintenance, adjustment... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION...) Exhaust gas recirculation system-related filters and coolers. (ii) Positive crankcase ventilation valve...

  11. 40 CFR 35.2206 - Operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 35.2206 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL... operation and maintenance manual. (2) In projects where a component is placed in operation before completion... project until a final operation and maintenance manual for the operating component is furnished and...

  12. 49 CFR 214.341 - Roadway maintenance machines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.341 Roadway maintenance machines. (a) Each employer shall include in its on-track safety program specific provisions for the safety of roadway workers who operate or work near roadway maintenance machines. Those...

  13. Pollution Prevention in the Land Maintenance System

    DTIC Science & Technology

    2000-04-01

    pollutants, and greenhouse gases. Canada’s Land Maintenance System consists of first line field units, second line field units, base units and a repair...workshops. For example, extending maintenance schedules, using extended life products and using dehumidification for preservation of equipment will lower

  14. Dynamic shared state maintenance in distributed virtual environments

    NASA Astrophysics Data System (ADS)

    Hamza-Lup, Felix George

    Advances in computer networks and rendering systems facilitate the creation of distributed collaborative environments in which the distribution of information at remote locations allows efficient communication. Particularly challenging are distributed interactive Virtual Environments (VE) that allow knowledge sharing through 3D information. The purpose of this work is to address the problem of latency in distributed interactive VE and to develop a conceptual model for consistency maintenance in these environments based on the participant interaction model. An area that needs to be explored is the relationship between the dynamic shared state and the interaction with the virtual entities present in the shared scene. Mixed Reality (MR) and VR environments must bring the human participant interaction into the loop through a wide range of electronic motion sensors, and haptic devices. Part of the work presented here defines a novel criterion for categorization of distributed interactive VE and introduces, as well as analyzes, an adaptive synchronization algorithm for consistency maintenance in such environments. As part of the work, a distributed interactive Augmented Reality (AR) testbed and the algorithm implementation details are presented. Currently the testbed is part of several research efforts at the Optical Diagnostics and Applications Laboratory including 3D visualization applications using custom built head-mounted displays (HMDs) with optical motion tracking and a medical training prototype for endotracheal intubation and medical prognostics. An objective method using quaternion calculus is applied for the algorithm assessment. In spite of significant network latency, results show that the dynamic shared state can be maintained consistent at multiple remotely located sites. In further consideration of the latency problems and in the light of the current trends in interactive distributed VE applications, we propose a hybrid distributed system architecture for

  15. Changes and challenges in the Software Engineering Laboratory

    NASA Technical Reports Server (NTRS)

    Pajerski, Rose

    1994-01-01

    Since 1976, the Software Engineering Laboratory (SEL) has been dedicated to understanding and improving the way in which one NASA organization, the Flight Dynamics Division (FDD), develops, maintains, and manages complex flight dynamics systems. The SEL is composed of three member organizations: NASA/GSFC, the University of Maryland, and Computer Sciences Corporation. During the past 18 years, the SEL's overall goal has remained the same: to improve the FDD's software products and processes in a measured manner. This requires that each development and maintenance effort be viewed, in part, as a SEL experiment which examines a specific technology or builds a model of interest for use on subsequent efforts. The SEL has undertaken many technology studies while developing operational support systems for numerous NASA spacecraft missions.

  16. [Effectiveness of different maintenance methods for codonopsis radix].

    PubMed

    Shi, Yan-Bin; Wang, Yu-Ping; Li, Yan; Liu, Cheng-Song; Li, Hui-Li; Zhang, Xiao-Yun; Li, Shou-Tang

    2014-05-01

    To observe different maintenance methods including vacuum-packing, storage together with tobacco, storage together with fennel, ethanol steam and sulfur fumigation for the protection of Codonopsis Radix against mildew and insect damage, and to analyze the content of polysaccharide and flavonoids of Codonopsis Radix tested in this studies, so as to look for the scientific maintenance methods replacing traditional sulfur fumigation. Except for the sulfur fumigation, naturally air-dried Codonopsis Radix was used to investigate the maintenance effectiveness of the above methods, respectively. Mildew was observed by visual inspection, and the content of polysaccharide and flavonoids were determined by ultra-violet and visible spectrophotometer. Comprehensive evaluation was given based on the results of the different maintenance methods. Low-temperature vacuum-packing, ambient-temperature vacuum-packing and sulfur fumigation could keep Codonopsis Radix from mildew and insect damage for one year, but ambient-temperature vacuum-packing showed flatulent phenomenon; ethanol steam could keep Codonopsis Radix from mildew and insects for over half a year; storage together with tobacco or fennel did not have maintenance effect. The difference of polysaccharide and flavonoids contents of all tested Codonopsis Radix was not statistically significant. Low temperature vacuum-packing maintenance can replace traditional sulfur fumigation, and it can maintain the quality of Codonopsis Radix to a certain extent.

  17. 27 CFR 19.723 - Maintenance and preservation of records.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Maintenance and preservation of records. 19.723 Section 19.723 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX... General § 19.723 Maintenance and preservation of records. (a) Place of maintenance. Records required by...

  18. 31 CFR 202.7 - Maintenance of balances within authorizations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Maintenance of balances within... FINANCIAL AGENTS OF THE FEDERAL GOVERNMENT 1 § 202.7 Maintenance of balances within authorizations. (a... public money on deposit in accounts with depositaries are responsible for the maintenance of balances in...

  19. 31 CFR 202.7 - Maintenance of balances within authorizations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false Maintenance of balances within... FINANCIAL AGENTS OF THE FEDERAL GOVERNMENT 1 § 202.7 Maintenance of balances within authorizations. (a... public money on deposit in accounts with depositaries are responsible for the maintenance of balances in...

  20. Estimating cost per lane mile for routine highway operations and maintenance

    DOT National Transportation Integrated Search

    2011-01-01

    The disparity between maintenance budgets and maintenance requirements causes agencies to make difficult choices : about maintenance priorities. There is a growing need to effectively link maintenance costs and condition to provide clear : evidence o...

  1. Effects of magnetic fields during high voltage live-line maintenance

    NASA Astrophysics Data System (ADS)

    Göcsei, Gábor; Kiss, István, Dr; Németh, Bálint

    2015-10-01

    In case of transmission and distribution networks, extra low frequency (typically 50 or 60 Hz) electric and magnetic fields have to be taken into consideration separately from each other. Health effects have been documented from exposures to both types of fields. Magnetic fields are qualified as possibly carcinogenic to humans (category “2B”) by WHO's cancer research institute, International Agency for Research on Cancer (IARC), so it is essential to protect the workers against their harmful effects. During live-line maintenance (LLM) electric fields can be shielded effectively by different kinds of conductive clothing, which are enclosed metal surfaces acting as a Faraday-cage. In practice laboratory measurements also prove their efficiency, the required shielding ratio is above 99% by the related standard.. A set of measurements have proved that regular conductive clothing used against the electric fields cannot shield the magnetic fields effectively at all. This paper introduces the possible risks of LLM from the aspect of the health effects of magnetic fields. Although in this case the principle of shielding the electric fields cannot be applied, new considerations in equipment design and technology can be used as a possible solution. Calculations and simulations based on the data of the Hungarian transmission network - which represents the European grid as a part of ENTSO-E - and high-current laboratory measurement results also prove the importance of the topic.

  2. Lessons learned about primary weight maintenance and secondary weight maintenance: results from a qualitative study.

    PubMed

    Reilly, Ann; Mawn, Barbara; Susta, Davide; Staines, Anthony; Browne, Sarah; Sweeney, Mary Rose

    2015-06-24

    Obesity is now a worldwide problem and Ireland is no exception with approximately two thirds of the adult population now overweight or obese. A recent report has found that 53% of Irish adults aged 50 years and over are classified as centrally obese and at substantially increased risk of metabolic complications. While most studies investigating weight maintenance have been conducted on those who have managed to lose weight and/or achieved weight loss maintenance (secondary weight maintainers), few studies have been undertaken to understand the attitudes, behaviours, motivations and strategies of those who maintain their weight within normal weight ranges over their lifetime, so called primary weight maintainers. This study aims to explore this issue through qualitative exploration of primary weight maintainers in an Irish University. Seven focus groups were conducted (including three single interviews) with 17 participants in total across three different groups, 1) primary weight maintainers, 2) secondary weight maintainers, and 3) those unable to sustain or achieve weight loss. The interviews were transcribed and thematic analysis was applied to interpret the findings. After analyzing the participant's interviews, planning and organization or lack of, emerged as themes across the three groups in varying degrees. Strategizing, perseverance and willpower were seen as integral to weight maintenance and weight loss in groups one and two, these were lacking in group three. Prioritizing exercise and perseverance in maintaining a high level of activity was evident in groups one and two and was lacking in group three. Motivational influences were equal across the groups however, group three found it difficult to turn this into action. Group one had behavioural control of calorie intake maintaining a balance between week and weekend eating. Group three found it difficult to control calorie intake and portion size. Self-image differed across the three groups with cognitive

  3. TVIS Inflight Maintenance

    NASA Image and Video Library

    2011-07-01

    ISS028-E-013758 (1 July 2011) --- Russian cosmonauts Sergei Volkov, Expedition 28 flight engineer; and Andrey Borisenko (mostly out of frame at left), commander, perform in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  4. Summer Roof Maintenance.

    ERIC Educational Resources Information Center

    Liscum, Curtis L.

    1999-01-01

    Presents the items to review in roofing maintenance to prepare for the impact of summer, including checking drainage, roof-field surface and membrane, flashings, sheet metal, and rooftop equipment, such as skylights and penthouses. A list of roofing facts facility managers should know are highlighted. (GR)

  5. Risk-based maintenance of ethylene oxide production facilities.

    PubMed

    Khan, Faisal I; Haddara, Mahmoud R

    2004-05-20

    This paper discusses a methodology for the design of an optimum inspection and maintenance program. The methodology, called risk-based maintenance (RBM) is based on integrating a reliability approach and a risk assessment strategy to obtain an optimum maintenance schedule. First, the likely equipment failure scenarios are formulated. Out of many likely failure scenarios, the ones, which are most probable, are subjected to a detailed study. Detailed consequence analysis is done for the selected scenarios. Subsequently, these failure scenarios are subjected to a fault tree analysis to determine their probabilities. Finally, risk is computed by combining the results of the consequence and the probability analyses. The calculated risk is compared against known acceptable criteria. The frequencies of the maintenance tasks are obtained by minimizing the estimated risk. A case study involving an ethylene oxide production facility is presented. Out of the five most hazardous units considered, the pipeline used for the transportation of the ethylene is found to have the highest risk. Using available failure data and a lognormal reliability distribution function human health risk factors are calculated. Both societal risk factors and individual risk factors exceeded the acceptable risk criteria. To determine an optimal maintenance interval, a reverse fault tree analysis was used. The maintenance interval was determined such that the original high risk is brought down to an acceptable level. A sensitivity analysis is also undertaken to study the impact of changing the distribution of the reliability model as well as the error in the distribution parameters on the maintenance interval.

  6. 14 CFR 21.445 - Maintenance of eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Maintenance of eligibility. 21.445 Section 21.445 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT... Maintenance of eligibility. The DAS shall continue to meet the requirements for issue of the authorization or...

  7. 14 CFR 21.445 - Maintenance of eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Maintenance of eligibility. 21.445 Section 21.445 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT... Maintenance of eligibility. The DAS shall continue to meet the requirements for issue of the authorization or...

  8. V-TECS Guide for Industrial Maintenance Mechanic.

    ERIC Educational Resources Information Center

    Meyer, Calvin F.; Benson, Robert T.

    This guide is intended to assist vocational teachers who are teaching a course in industrial machinery maintenance and repair; electromechanical, hydraulic, and pneumatic instrument repair; or building maintenance. Addressed in the individual units of the course outline are the following topics: assembling and disassembling machine mechanisms;…

  9. 45 CFR 1310.13 - Maintenance of vehicles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Maintenance of vehicles. 1310.13 Section 1310.13... PROGRAM HEAD START TRANSPORTATION Transportation Requirements § 1310.13 Maintenance of vehicles. Each agency providing transportation services must ensure that vehicles used to provide such services are...

  10. 45 CFR 1310.13 - Maintenance of vehicles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Maintenance of vehicles. 1310.13 Section 1310.13... PROGRAM HEAD START TRANSPORTATION Transportation Requirements § 1310.13 Maintenance of vehicles. Each agency providing transportation services must ensure that vehicles used to provide such services are...

  11. 45 CFR 1310.13 - Maintenance of vehicles.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Maintenance of vehicles. 1310.13 Section 1310.13... PROGRAM HEAD START TRANSPORTATION Transportation Requirements § 1310.13 Maintenance of vehicles. Each agency providing transportation services must ensure that vehicles used to provide such services are...

  12. Standardized Curriculum for General Industrial Maintenance Trades.

    ERIC Educational Resources Information Center

    Mississippi State Dept. of Education, Jackson. Office of Vocational, Technical and Adult Education.

    Standardized vocational education course titles and core contents for two courses in Mississippi are provided: general industrial maintenance trades I and II. The first course contains the following units: (1) orientation and leadership activities; (2) safety; (3) blueprint reading; (4) oxyacetylene cutting; (5) preventative maintenance; (6)…

  13. 32 CFR 2402.10 - Maintenance of statistics.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Maintenance of statistics. 2402.10 Section 2402.10 National Defense Other Regulations Relating to National Defense OFFICE OF SCIENCE AND TECHNOLOGY POLICY REGULATIONS IMPLEMENTING THE FREEDOM OF INFORMATION ACT § 2402.10 Maintenance of statistics. (a...

  14. 29 CFR 2201.10 - Maintenance of statistics.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Maintenance of statistics. 2201.10 Section 2201.10 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION REGULATIONS IMPLEMENTING THE FREEDOM OF INFORMATION ACT § 2201.10 Maintenance of statistics. (a) The FOIA Disclosure...

  15. 29 CFR 1926.431 - Maintenance of equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Maintenance of equipment. 1926.431 Section 1926.431 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Environmental Considerations § 1926.431 Maintenance of equipment. The employer shall ensure that all wiring...

  16. 40 CFR 57.109 - Maintenance of pay.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Maintenance of pay. 57.109 Section 57.109 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS General § 57.109 Maintenance of pay. The Administrator will not approve...

  17. 29 CFR 2201.10 - Maintenance of statistics.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Maintenance of statistics. 2201.10 Section 2201.10 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION REGULATIONS IMPLEMENTING THE FREEDOM OF INFORMATION ACT § 2201.10 Maintenance of statistics. (a) The FOIA Disclosure...

  18. EMMA: The expert system for munition maintenance

    NASA Technical Reports Server (NTRS)

    Mullins, Barry E.

    1988-01-01

    Expert Missile Maintenance Aid (EMMA) is a first attempt to enhance maintenance of the tactical munition at the field and depot level by using artificial intelligence (AI) techniques. The ultimate goal of EMMA is to help a novice maintenance technician isolate and diagnose electronic, electromechanical, and mechanical equipment faults to the board/chassis level more quickly and consistently than the best human expert using the best currently available automatic test equipment (ATE). To this end, EMMA augments existing ATE with an expert system that captures the knowledge of design and maintenance experts. The EMMA program is described, including the evaluation of field-level expert system prototypes, the description of several study tasks performed during EMMA, and future plans for a follow-on program. This paper will briefly address several study tasks performed during EMMA. The paper concludes with a discussion of future plans for a follow-on program and other areas of concern.

  19. A maintenance time prediction method considering ergonomics through virtual reality simulation.

    PubMed

    Zhou, Dong; Zhou, Xin-Xin; Guo, Zi-Yue; Lv, Chuan

    2016-01-01

    Maintenance time is a critical quantitative index in maintainability prediction. An efficient maintenance time measurement methodology plays an important role in early stage of the maintainability design. While traditional way to measure the maintenance time ignores the differences between line production and maintenance action. This paper proposes a corrective MOD method considering several important ergonomics factors to predict the maintenance time. With the help of the DELMIA analysis tools, the influence coefficient of several factors are discussed to correct the MOD value and the designers can measure maintenance time by calculating the sum of the corrective MOD time of each maintenance therbligs. Finally a case study is introduced, by maintaining the virtual prototype of APU motor starter in DELMIA, designer obtains the actual maintenance time by the proposed method, and the result verifies the effectiveness and accuracy of the proposed method.

  20. Informed maintenance for next generation space transportation systems

    NASA Astrophysics Data System (ADS)

    Fox, Jack J.

    2001-02-01

    Perhaps the most substantial single obstacle to progress of space exploration and utilization of space for human benefit is the safety & reliability and the inherent cost of launching to, and returning from, space. The primary influence in the high costs of current launch systems (the same is true for commercial and military aircraft and most other reusable systems) is the operations, maintenance and infrastructure portion of the program's total life cycle costs. Reusable Launch Vehicle (RLV) maintenance and design have traditionally been two separate engineering disciplines with often conflicting objectives-maximizing ease of maintenance versus optimizing performance, size and cost. Testability analysis, an element of Informed Maintenance (IM), has been an ad hoc, manual effort, in which maintenance engineers attempt to identify an efficient method of troubleshooting for the given product, with little or no control over product design. Therefore, testability deficiencies in the design cannot be rectified. It is now widely recognized that IM must be engineered into the product at the design stage itself, so that an optimal compromise is achieved between system maintainability and performance. The elements of IM include testability analysis, diagnostics/prognostics, automated maintenance scheduling, automated logistics coordination, paperless documentation and data mining. IM derives its heritage from complimentary NASA science, space and aeronautic enterprises such as the on-board autonomous Remote Agent Architecture recently flown on NASA's Deep Space 1 Probe as well as commercial industries that employ quick turnaround operations. Commercial technologies and processes supporting NASA's IM initiatives include condition based maintenance technologies from Boeing's Commercial 777 Aircraft and Lockheed-Martin's F-22 Fighter, automotive computer diagnostics and autonomous controllers that enable 100,000 mile maintenance free operations, and locomotive monitoring