Sample records for laboratory pnl contracted

  1. Superfund Contract Laboratory Program

    EPA Pesticide Factsheets

    The Contract Laboratory Program (CLP) is a national network of EPA personnel, commercial laboratories, and support contractors whose primary mission is to provide data of known and documented quality to the Superfund program.

  2. Hemostasis in tubeless PNL: point of technique.

    PubMed

    Aron, Monish; Goel, Rajiv; Kesarwani, Pawan K; Gupta, Narmada P

    2004-01-01

    Tubeless PNL (percutaneous nephrolithotomy), in a highly selected group of patients, is a modification aimed at reducing the morbidity of PNL. We present a simple technique of achieving tract hemostasis as an adjunct to the safe performance of a tubeless PNL. Charts of 40 consecutive patients who underwent tubeless PNL at our center were reviewed. In the latter 20 consecutive patients, diathermy coagulation of the intrarenal bleeders and tract was done and these patients were compared with the earlier 20 patients in whom fulguration was not done. Drop in hemoglobin, postoperative analgesic requirement, operating time, length of hospitalization and postoperative complications were compared. No statistical difference was found between the operative times and drop in hemoglobin for both the groups. The length of hospitalization and postoperative analgesic requirement were significantly less in the fulguration group. No significant complications were noted in either of the two groups. Fulguration of visible intrarenal and tract bleeders is a simple, safe and effective hemostatic adjunct in patients undergoing tubeless PNL. copyright 2004 S. Karger AG, Basel

  3. Cleanup Verification Package for the 118-F-5 PNL Sawdust Pit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    L. D. Habel

    2008-05-20

    This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-5 Burial Ground, the PNL (Pacific Northwest Laboratory) Sawdust Pit. The 118-F-5 Burial Ground was an unlined trench that received radioactive sawdust from the floors of animal pens in the 100-F Experimental Animal Farm.

  4. Ultrasonography-guided PNL in comparison with laparoscopic ureterolithotomy in the management of large proximal ureteral stone.

    PubMed

    Karami, Hossein; Mazloomfard, Mohammad Mohsen; Lotfi, Behzad; Alizadeh, Asghar; Javanmard, Babak

    2013-01-01

    The aim of study was to evaluate the clinical outcomes of PNL in comparison with laparoscopic ureterolithotomy (LUL) in proximal ureteral stones larger than 1 cm. A total of 80 patients who were candidates for treatment of large ureteral stones in our urology center were enrolled in the study between September 2004 and September 2008. By using patient randomization, they were assigned into two forty-patient groups (PNL and LUL). After evaluating the patients with laboratory tests and IVP, PNL was performed under sonography guidance in the prone position or the patients were submitted to classic laparoscopic ureterolithotomy (LUL) transperitoneally. All patients underwent postoperative assessments including KUB and ultrasonography. A hundred-percent success was achieved in both groups. The mean age of the patients were 39.4 (16-63) and 35.2 (18-57) years old in PNL and LUL groups, respectively. The mean stone size in PNL group was 14.2 (10-25) mm and in LUL group was 13.5 (10-28) mm. The duration of the operations were 54.35 (50-82) minutes, and 82.15 (73-180) minutes (P < 0.0001); and the average hospital stay days were 2.6 (2-5) and 3.5 (3-8) days (p = 0.011) in groups PNL and LUL, accordingly. The mean Hb decrease in PNL group was 0.9mg/dL and in LUL group was 0.4mg/dL (p = 0.001). No statistically significant differences in terms of blood transfusion, fever, ICU admission, and prolonged urinary leakage were detected in both groups. According to our study, percutaneous nephrolithotomy under ultrasonography guidance is comparable with the laparoscopic ureterolithotomy for the treatment of proximal ureteral stones larger than 1 cm.

  5. Two pectin lyase genes, pnl-1 and pnl-2, from Colletotrichum gloeosporioides f. sp. malvae differ in a cellulose-binding domain and in their expression during infection of Malva pusilla.

    PubMed

    Wei, Yangdou; Shih, Jenny; Li, Jieran; Goodwin, Paul H

    2002-07-01

    Two pectin lyase genes, designated pnl-1 and pnl-2, were cloned from Colletotrichum gloeosporioides f. sp. malvae, a pathogen of round-leaved mallow (Malva pusilla). pnl-1 was isolated using cDNA from infected plant material; pnl-2 was isolated using cDNA from 3-day-old mycelia grown in mallow-cell-wall extract (MCWE) broth. pnl-1 is the first pectinase gene described thus far to encode a cellulose-binding domain (CBD), which is common in cellulases and xylanases, whereas pnl-2 encodes a pectin lyase that lacks a CBD. In pure culture, pnl-1 expression could be detected when purified pectin or glucose was the sole carbon source, but not when MCWE was the sole carbon source. The lack of pnl-1 expression appeared to be due to gene repression by some unknown factor(s) in the cell-wall extract. In contrast, expression of pnl-2 was detected in cultures when MCWE, but not when purified pectin or glucose, was the sole carbon source. In infected tissue, detection of pnl-1 expression by Northern-blot hybridization and by RT-PCR began with the onset of the necrotrophic phase of infection. Expression ofpnl-2 was not detectable by Northern-blot hybridization, but was observed byRT-PCR in both the biotrophic and necrotrophic phases of infection. The differences between pnl-1 and pnl-2 (i.e. pnl-1 encoding a CBD and differences in the expression patterns of both genes) may be related to the requirements of C. gloeosporioides f. sp. malvae to be able to grow in host tissue under the different conditions present during the biotrophic and necrotrophic phases of infection.

  6. Day care PNL using 'Santosh-PGI hemostatic seal' versus standard PNL: A randomized controlled study.

    PubMed

    Kumar, Santosh; Singh, Shivanshu; Singh, Prashant; Singh, Shrawan Kumar

    2016-01-01

    To compare the outcomes of tubeless day care PNL using hemostatic seal in the access tract versus standard PNL. It was a prospective randomized controlled study. Cases were randomized to either the day care group with hemostatic seal (DCS) or the control group where patients were admitted and a nephrostomy tube was placed at the conclusion of surgery. A total of 180 cases were screened and out of these, 113 were included in the final analysis. The stone clearance rates were comparable in both the groups. The mean drop in hemoglobin was significantly lower in DCS group than the control group (1.05 ±0.68 vs. 1.30 ±0.58 gm/dl, p = 0.038).Mean postoperative pain score, analgesic requirement (paracetamol) and duration of hospital stay were also significantly lower in the DCS group (3.79 ±1.23 vs. 6.12 ±0.96, 1.48 ±0.50 vs. 4.09 ±1.11 grams and 0.48 ±0.26 vs. 4.74 ±1.53 days respectively; p <0.05). The incidence of urine leakage through the access tract site was significantly lower in the DCS subgroup when compared to the controls (3.6% vs. 21.1%, p <0.05). Cases in the DCS group resumed their normal activities in a significantly shorter time (8.05 ±3.05 vs.18.42 ±4.42 days; p <0.05). Higher proportion of cases in the DCS group got re-admitted, although it was not a statistically significant number (7.1% vs. 1.8%; p = 0.21). Tubeless day care PNL with composite hemostatic tract seal is considered safe. It resulted in a significant reduction of blood loss and analgesic requirement with significantly reduced hospital stay, nephrostomy tube site morbidity and time required to resume normal activity when compared to the standard PNL. However, patients must be compliant with the given instructions and should have access to a health care facility, as few of them may need re-admission.

  7. Day care PNL using ‘Santosh-PGI hemostatic seal’ versus standard PNL: A randomized controlled study

    PubMed Central

    Singh, Shivanshu; Singh, Prashant; Singh, Shrawan Kumar

    2016-01-01

    Introduction To compare the outcomes of tubeless day care PNL using hemostatic seal in the access tract versus standard PNL. Material and methods It was a prospective randomized controlled study. Cases were randomized to either the day care group with hemostatic seal (DCS) or the control group where patients were admitted and a nephrostomy tube was placed at the conclusion of surgery. Results A total of 180 cases were screened and out of these, 113 were included in the final analysis. The stone clearance rates were comparable in both the groups. The mean drop in hemoglobin was significantly lower in DCS group than the control group (1.05 ±0.68 vs. 1.30 ±0.58 gm/dl, p = 0.038).Mean postoperative pain score, analgesic requirement (paracetamol) and duration of hospital stay were also significantly lower in the DCS group (3.79 ±1.23 vs. 6.12 ±0.96, 1.48 ±0.50 vs. 4.09 ±1.11 grams and 0.48 ±0.26 vs. 4.74 ±1.53 days respectively; p <0.05). The incidence of urine leakage through the access tract site was significantly lower in the DCS subgroup when compared to the controls (3.6% vs. 21.1%, p <0.05). Cases in the DCS group resumed their normal activities in a significantly shorter time (8.05 ±3.05 vs.18.42 ±4.42 days; p <0.05). Higher proportion of cases in the DCS group got re-admitted, although it was not a statistically significant number (7.1% vs. 1.8%; p = 0.21). Conclusions Tubeless day care PNL with composite hemostatic tract seal is considered safe. It resulted in a significant reduction of blood loss and analgesic requirement with significantly reduced hospital stay, nephrostomy tube site morbidity and time required to resume normal activity when compared to the standard PNL. However, patients must be compliant with the given instructions and should have access to a health care facility, as few of them may need re-admission. PMID:27551557

  8. The patient position for PNL: does it matter?

    PubMed

    Cracco, Cecilia Maria; Scoffone, Cesare Marco; Poggio, Massimiliano; Scarpa, Roberto Mario

    2010-03-01

    Currently, PNL is the treatment of choice for large and/or otherwise complex urolithiasis. PNL was initially performed with the patient in a supine-oblique position, but later on the prone position became the conventional one for habit and handiness. The prone position provides a larger area for percutaneous renal access, a wider space for instrument manipulation, and a claimed lower risk of splanchnic injury. Nonetheless, it implies important anaesthesiological risks, including circulatory, haemodynamic, and ventilatory difficulties; need of several nurses to be present for intraoperative changes of the decubitus in case of simultaneous retrograde instrumentation of the ureter, implying evident risks related to pressure points; an increased radiological hazard to the urologist's hands; patient discomfort. To overcome these drawbacks, various safe and effective changes in patient positioning for PNL have been proposed over the years, including the reverse lithotomy position, the prone split-leg position, the lateral decubitus, the supine position, and the Galdakao-modified supine Valdivia (GMSV) position. Among these, the GMSV position is safe and effective, and seems profitable and ergonomic. It allows optimal cardiopulmonary control during general anaesthesia; an easy puncture of the kidney; a reduced risk of colonic injury; simultaneous antero-retrograde approach to the renal cavities (PNL and retrograde ureteroscopy = ECIRS, Endoscopic Combined IntraRenal Surgery), with no need of intraoperative repositioning of the anaesthetized patient, less need for nurses in the operating room, less occupational risk due to shifting of heavy loads, less risk of pressure injuries related to inaccurate repositioning, and reduced duration of the procedure; facilitated spontaneous evacuation of stone fragments; a comfortable sitting position and a restrained X-ray exposure of the hands for the urologist. But, first of all, GMSV position fully supports a new comprehensive

  9. Laboratory animal-based collaborations and contracts beyond the border.

    PubMed

    Stark, Dennis

    2006-06-01

    There is a 'dollars crunch' at your institution. At a management meeting a discussion develops around the idea of outsourcing some of the future animal-based work to a facility located in another country. As a leader of the laboratory animal program, you need to answer the question: "What do we need to consider before agreeing to an overseas contract to complement our internal efforts?" The author sets out to answer this question as it relates to issues of animal care and use, regulatory and ethical concerns, legal obligations, and oversight of the work. The article focuses on international contracts and collaborations, but many of the principles discussed are also applicable to interinstitutional collaborations and contracts within the country where the laboratory animal program is based.

  10. Does the nephrostomy tract length impact the outcomes of percutaneous nephrolithotomy (PNL)?

    PubMed

    Astroza, Gaston M; Neisius, Andreas; Tsivian, Matvey; Wang, Agnes J; Preminger, Glenn M; Lipkin, Michael E

    2014-12-01

    Different factors can determine the outcomes of percutaneous nephrolithotomy (PNL). We analyzed the effect of tract length (TL) on outcomes after PNL. We performed a retrospective review of patients undergoing PNL between 2006 and 2011. Patients with preoperative computed tomography (CT), one percutaneous access tract and follow-up imaging within 3 months were included. TL was defined as distance between the skin to the calyx of puncture as measured on preoperative CT. Measurements were independently performed by two urologists and the average was used for analysis. Stone-free rate (SFR) was defined as zero fragments on follow-up imaging. Factors independently associated with the likelihood of being stone-free after PNL were determined using multivariable analysis adjusted for TL, location of access, the presence of incomplete or complete staghorn calculi and type of follow-up imaging. Complications (Clavien score) were independently assessed. A total of 222 patients were included. Median stone burden and body mass index (BMI) was 239.4 mm(2) and 30.5 [interquartile range (IQR): 25.7-36.2]. The median TL was 85.0 mm (IQR: 70.3-100.0) and highly correlated with BMI (ρ = 0.66, p < 0.001). A total of 101 patients (45.5 %) were stone-free. TL was not associated with SFR (p = 0.53). Clavien 1 and 2 complications occurred in 38 (17 %) while Clavien 3 and 4 complications occurred in 17 (8 %) patients. Multivariable analysis revealed no association between complications and TL even when adjusted for gender. Percutaneous TL is not associated with outcomes of PNL. PNL is a safe and effective treatment for stones in patients with differing body habitus.

  11. Safety in the Chemical Laboratory: Contracts to Dispose of Laboratory Waste.

    ERIC Educational Resources Information Center

    Fischer, Kenneth E.

    1985-01-01

    Presents a sample contract for disposing of hazardous wastes in an environmentally sound, timely manner in accordance with all federal, state, and local requirements. Addresses situations where hazardous waste must be disposed of outside the laboratory and where alternate disposal methods are not feasible. (JN)

  12. Flexible ureterorenoscopy versus miniaturized PNL for solitary renal calculi of 10-30 mm size.

    PubMed

    Knoll, Thomas; Jessen, Jan Peter; Honeck, Patrick; Wendt-Nordahl, Gunnar

    2011-12-01

    The value of flexible ureterorenoscopy (fURS) and miniaturized PNL (mPNL) for larger renal calculi is under discussion. This non-randomized prospective study aimed to evaluate fURS and mPNL for solitary renal stones of 10-30 mm size. fURS was carried out in 21 patients with last generation 7.5F endoscopes. Ureteral access sheaths were used in 19 patients. For mPNL, an 18F modified Amplatz sheath with a 14F nephroscope were used (n = 25). The procedure was performed either tubeless with an antegrade stent or a nephrostomy. Outcome and complications of both procedures were assessed. Patients' demographics and stone sizes were comparable (18 ± 5 vs. 19 ± 4 mm, P = 0.08). Patients in the fURS group had a higher mean BMI (31 vs. 27, P < 0.05). Total OR time was significantly longer for fURS (106 ± 51 vs. 59 ± 19 min., P < 0.001). More patients were stone-free after one single percutaneous treatment, while 2nd-stage treatments with fURS were common (total procedures 1.04 vs. 1.52, P < 0.001; immediate stone-free rate (SFR) 96% vs. 71.5%, P < 0.001). SFR after 4 weeks was 100% (mPNL) and 85.8% (fURS) (P < 0.01). Minor complications as classified by Clavien I or II occurred in 16 and 23.8%, mPNL and fURS, respectively, P = 0.13). No major complications (Clavien III-V) occured in both groups. Our series supports both the concept of either percutaneous or retrograde endoscopic treatment for renal calculi with both modalities offering excellent safety. However, while for fURS, a significantly higher rate of 2nd-stage procedures was necessary, and mPNL led to faster and higher SFR without increasing complication rate.

  13. Gene inactivation in the plant pathogen Glomerella cingulata: three strategies for the disruption of the pectin lyase gene pnlA.

    PubMed

    Bowen, J K; Templeton, M D; Sharrock, K R; Crowhurst, R N; Rikkerink, E H

    1995-01-20

    The feasibility of performing routine transformation-mediated mutagenesis in Glomerella cingulata was analysed by adopting three one-step gene disruption strategies targeted at the pectin lyase gene pnlA. The efficiencies of disruption following transformation with gene replacement- or gene truncation-disruption vectors were compared. To effect replacement-disruption, G. cingulata was transformed with a vector carrying DNA from the pnlA locus in which the majority of the coding sequence had been replaced by the gene for hygromycin B resistance. Two of the five transformants investigated contained an inactivated pnlA gene (pnlA-); both also contained ectopically integrated vector sequences. The efficacy of gene disruption by transformation with two gene truncation-disruption vectors was also assessed. Both vectors carried at 5' and 3' truncated copy of the pnlA coding sequence, adjacent to the gene for hygromycin B resistance. The promoter sequences controlling the selectable marker differed in the two vectors. In one vector the homologous G. cingulata gpdA promoter controlled hygromycin B phosphotransferase expression (homologous truncation vector), whereas in the second vector promoter elements were from the Aspergillus nidulans gpdA gene (heterologous truncation vector). Following transformation with the homologous truncation vector, nine transformants were analysed by Southern hybridisation; no transformants contained a disrupted pnlA gene. Of nineteen heterologous truncation vector transformants, three contained a disrupted pnlA gene; Southern analysis revealed single integrations of vector sequence at pnlA in two of these transformants. pnlA mRNA was not detected by Northern hybridisation in pnlA- transformants. pnlA- transformants failed to produce a PNLA protein with a pI identical to one normally detected in wild-type isolates by silver and activity staining of isoelectric focussing gels. Pathogenesis on Capsicum and apple was unaffected by disruption of

  14. Prospective comparative study of miniperc and standard PNL for treatment of 1 to 2 cm size renal stone.

    PubMed

    Mishra, Shashikant; Sharma, Rajan; Garg, Chandrapraksh; Kurien, Abraham; Sabnis, Ravindra; Desai, Mahesh

    2011-09-01

    • To evaluate the results of miniperc vis-à-vis standard PNL in the treatment of stones of 1-2 cm in size. Miniperc may represent a reasonable procedure in patients with nonbulky urolithiasis offering a similar outcome as standard percutaneous nephrolithotomy (PNL) with advantage of reduced morbidity. • 55 procedures including 27 miniperc and 28 standard PNL were performed for renal stones 1-2 cm in size. Pediatric patient, active urinary tract infection, renal malformation, uncorrected coagulopathy and morbid obesity patients were excluded from the study. • The parameters studied were demography, operative time, postoperative analgesic requirement, hemoglobin drop, complications and stone clearance. • Mean tract size was 18.2 ± 2 F (15-20) and 26.8 ± 2 F (24-30), P value <0.0001 in the miniperc and standard PNL, respectively. Holmium LASER and pneumatic lithotripter were the main energy sources used in miniperc and standard PNL, respectively. • Miniperc operative time was longer than that of standard PNL (45.2 ± 12.6 vs 31 ± 16.6 min, P= 0.0008 respectively). • Conversely, there was an advantage of miniperc over standard PNL in terms of a significantly reduced hemoglobin drop (0.8 ± 0.9 vs 1.3 ± 0.4 gram%, P= 0.01), analgesic requirement (55.4 ± 50 vs 70.2 ± 52 mg tramadol, P= 0.29) and hospital stay (3.2 ± 0.8 vs 4.8 ± 0.6 days, P ≤ 0.001), respectively. • Intra- operative conversion of the procedure into a tubeless PNL was significantly more in the miniperc group (P ≤ 0.001). The miniperc and standard PNL group had clearance rates of 96% and 100%, respectively at 1 month follow up. • This study demonstrated significant advantages of the miniperc procedure in terms of reduced bleeding leading to a tubeless procedure and reduced hospital stay. • The stone free rates and the complications were similar in either group. © 2011 THE AUTHORS. BJU INTERNATIONAL © 2011 BJU INTERNATIONAL.

  15. CRADA with United Solar Technologies and Pacific Northwest Laboratory (PNL-021): Thin film materialsfor low-cost high performance solar concentrators

    NASA Astrophysics Data System (ADS)

    Martin, P. M.; Affinito, J. D.; Gross, M. E.; Bennett, W. D.

    1995-03-01

    The objectives of this project were to develop and evaluate promising low-cost dielectric and polymer-protected thin-film reflective metal coatings to be applied to preformed continuously-curved solar reflector panels to enhance their solar reflectance, and to demonstrate protected solar reflective coatings on preformed solar concentrator panels. The opportunity for this project arose from a search by United Solar Technologies (UST) for organizations and facilities capable of applying reflective coatings to large preformed panels. PNL was identified as being uniquely qualified to participate in this collaborative project.

  16. The effects of previous open renal stone surgery types on PNL outcomes

    PubMed Central

    Ozgor, Faruk; Kucuktopcu, Onur; Ucpinar, Burak; Sarilar, Omer; Erbin, Akif; Yanaral, Fatih; Sahan, Murat; Binbay, Murat

    2016-01-01

    Introduction: Our aim was to demonstrate the effect of insicion of renal parenchyma during open renal stone surgery (ORSS) on percutaneous nephrolithotomy (PNL) outcomes. Methods: Patients with history of ORSS who underwent PNL operation between June 2005 and June 2015 were analyzed retrospectively. Patients were divided into two groups according to their type of previous ORSS. Patients who had a history of ORSS with parenchymal insicion, such as radial nephrotomies, anatrophic nephrolithotomy, lower pole resection, and partial nephrectomy, were included in Group 1. Other patients with a history of open pyelolithotomy were enrolled in Group 2. Preoperative characteristics, perioperative data, stone-free status, and complications were compared between the groups. Stone-free status was defined as complete clearance of stone(s) or presence of residual fragments smaller than 4 mm. The retrospective nature of our study, different experience level of surgeons, and lack of the evaluation of anesthetic agents and cost of procedures were limitations of our study. Results: 123 and 111 patients were enrolled in Groups 1 and 2, respectively. Preoperative characteristics were similar between groups. In Group 1, the mean operative time was statistically longer than in Group 2 (p=0.013). Stone-free status was significantly higher in Group 2 than in Group 1 (p=0.027). Complication rates were similar between groups. Hemorrhage requiring blood transfusion was the most common complication in both groups (10.5% vs. 9.9%). Conclusions: Our study demonstrated that a history of previous ORSS with parenchymal insicion significantly reduces the success rates of PNL procedure. PMID:28255416

  17. The effects of previous open renal stone surgery types on PNL outcomes.

    PubMed

    Ozgor, Faruk; Kucuktopcu, Onur; Ucpinar, Burak; Sarilar, Omer; Erbin, Akif; Yanaral, Fatih; Sahan, Murat; Binbay, Murat

    2016-01-01

    Our aim was to demonstrate the effect of insicion of renal parenchyma during open renal stone surgery (ORSS) on percutaneous nephrolithotomy (PNL) outcomes. Patients with history of ORSS who underwent PNL operation between June 2005 and June 2015 were analyzed retrospectively. Patients were divided into two groups according to their type of previous ORSS. Patients who had a history of ORSS with parenchymal insicion, such as radial nephrotomies, anatrophic nephrolithotomy, lower pole resection, and partial nephrectomy, were included in Group 1. Other patients with a history of open pyelolithotomy were enrolled in Group 2. Preoperative characteristics, perioperative data, stone-free status, and complications were compared between the groups. Stone-free status was defined as complete clearance of stone(s) or presence of residual fragments smaller than 4 mm. The retrospective nature of our study, different experience level of surgeons, and lack of the evaluation of anesthetic agents and cost of procedures were limitations of our study. 123 and 111 patients were enrolled in Groups 1 and 2, respectively. Preoperative characteristics were similar between groups. In Group 1, the mean operative time was statistically longer than in Group 2 (p=0.013). Stone-free status was significantly higher in Group 2 than in Group 1 (p=0.027). Complication rates were similar between groups. Hemorrhage requiring blood transfusion was the most common complication in both groups (10.5% vs. 9.9%). Our study demonstrated that a history of previous ORSS with parenchymal insicion significantly reduces the success rates of PNL procedure.

  18. EPA Contract Laboratory Program Statement of Work for Inorganic Superfund Methods Multi-Media, Multi-Concentration ISM02.3

    EPA Pesticide Factsheets

    This document contains analytical methods for the analysis of metals and cyanide in environmental samples. It also contains contractual requirements for laboratories participating in Superfund's Contract Laboratory Program.

  19. EPA Contract Laboratory Program Statement of Work for Inorganic Superfund Methods Multi-Media, Multi-Concentration ISM02.4

    EPA Pesticide Factsheets

    This document contains analytical methods for the analysis of metals and cyanide in environmental samples. It also contains contractual requirements for laboratories participating in Superfund's Contract Laboratory Program.

  20. KBA62 and PNL2: 2 new melanoma markers-immunohistochemical analysis of 1563 tumors including metastatic, desmoplastic, and mucosal melanomas and their mimics.

    PubMed

    Aung, Phyu Phyu; Sarlomo-Rikala, Maarit; Lasota, Jerzy; Lai, Jin-Ping; Wang, Zeng-Feng; Miettinen, Markku

    2012-02-01

    Identification of metastatic melanoma can be difficult because of its considerable morphologic variation and mimicry of a wide variety of other tumors. The more melanoma-specific melanoma markers, MelanA/MART-1, HMB45, and tyrosinase, used in addition to S100 protein, all have limitations in sensitivity and specificity. In this study, we evaluated 2 new melanoma markers, monoclonal antibodies KBA62 and PNL2 to yet unidentified antigens, using a large panel of metastatic melanomas (n=214), desmoplastic melanomas (n=34), gastrointestinal mucosal melanomas (n=54), benign nevi (n=27), clear cell sarcomas (n=16), and nonmelanocytic tumors (n=1218). Immunoreactivity for KBA62 and PNL2 was found in all pigmented nevi and in 86% and 90% of metastatic melanomas, respectively. Mucosal melanomas showed a similar rate of PNL2 immunoreactivity but somewhat less frequent KBA62 positivity (72%). In addition, KBA62 was found to be a sensitive diagnostic marker for desmoplastic melanoma (28 of 34; 82%), whereas PNL2 was only rarely positive (2 of 34; 6%). KBA62-positive normal tissues included pericytes, vascular and parenchymal smooth muscles, and basal cells of complex epithelia, including myoepithelia, whereas PNL2 labeled only melanocytes and neutrophils. Among nonmelanocytic tumors, those that were KBA62 positive were nodular fasciitis, leiomyoma and leiomyosarcoma, gastrointestinal stromal tumors, benign and malignant nerve sheath tumors, synovial sarcoma, and subsets of various carcinomas, especially those with squamous cell/stratified epithelial differentiation. PNL2 positivity in nonmelanocytic tumors was more restricted but occurred consistently in angiomyolipoma and other perivascular epitheloid cell tumor and in chronic myeloid leukemia tissue infiltrates. KBA62 may assist in the identification of desmoplastic melanomas, but its widespread occurrence in nonmelanomas limits utility. PNL2 is highly specific for melanomas but lacks reactivity with desmoplastic melanomas

  1. 46 CFR 159.010-15 - Contracting inspections and tests or transferrals to another laboratory or person.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Contracting inspections and tests or transferrals to another laboratory or person. 159.010-15 Section 159.010-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Independent Laboratory...

  2. 46 CFR 159.010-15 - Contracting inspections and tests or transferrals to another laboratory or person.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Contracting inspections and tests or transferrals to another laboratory or person. 159.010-15 Section 159.010-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Independent Laboratory...

  3. The effect of Pro NanoLipospheres (PNL) formulation containing natural absorption enhancers on the oral bioavailability of delta-9-tetrahydrocannabinol (THC) and cannabidiol (CBD) in a rat model.

    PubMed

    Cherniakov, Irina; Izgelov, Dvora; Domb, Abraham J; Hoffman, Amnon

    2017-11-15

    The lipophilic phytocannabinoids cannabidiol (CBD) and Δ 9 -tetrahydrocannabinol (THC) show therapeutic efficacy in various medical conditions. Both molecules are poorly water soluble and subjected to extensive first pass metabolism in the gastrointestinal tract, leading to a limited oral bioavailability of approximately 9%. We have developed an advanced lipid based Self-Emulsifying Drug Delivery System termed Advanced Pro-NanoLiposphere (PNL) pre-concentrate. The PNL is composed of lipid and emulsifying excipients of GRAS status and are known to increase solubility and reduce Phase I metabolism of lipophilic active compounds. Advanced PNLs are PNLs with an incorporated natural absorption enhancers. These molecules are natural alkaloids and phenolic compounds which were reported to inhibit certain phase I and phase II metabolism processes. Here we use piperine, curcumin and resveratrol to formulate the Advanced-PNL formulations. Consequently, we have explored the utility of these Advanced-PNLs on CBD and THC oral bioavailability. Oral administration of CBD-piperine-PNL resulted in 6-fold increase in AUC compared to CBD solution, proving to be the most effective of the screened formulations. The same trend was found in pharmacokinetic experiments of THC-piperine-PNL which resulted in a 9.3-fold increase in AUC as compared to THC solution. Our Piperine-PNL can be used as a platform for synchronized delivery of piperine and CBD or THC to the enterocyte site. This co-localization provides an increase in CBD and THC bioavailability by its effect at the pre-enterocyte and the enterocyte levels of the absorption process. The extra augmentation in the absorption of CBD and THC by incorporating piperine into PNL is attributed to the inhibition of Phase I and phase II metabolism by piperine in addition to the Phase I metabolism and P-gp inhibition by PNL. These novel results pave the way to utilize piperine-PNL delivery system for other poorly soluble, highly metabolized

  4. Pacific Northwest Laboratory Institutional Plan FY 1995-2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    This report serves as a document to describe the role PNL is positioned to take in the Department of Energy`s plans for its national centers in the period 1995-2000. It highlights the strengths of the facilities and personnel present at the laboratory, touches on the accomplishments and projects they have contributed to, and the direction being taken to prepare for the demands to be placed on DOE facilities in the near and far term. It consists of sections titled: director`s statement; laboratory mission and core competencies; laboratory strategic plan; laboratory initiatives; core business areas; critical success factors.

  5. The pnk/pnl gene (ORF 86) of Autographa californica nucleopolyhedrovirus is a non-essential, immediate early gene.

    PubMed

    Durantel, D; Croizier, L; Ayres, M D; Croizier, G; Possee, R D; López-Ferber, M

    1998-03-01

    Autographa californica nucleopolyhedrovirus (AcMNPV) ORF 86, located within the HindIII C fragment, potentially encodes a protein which shares sequence similarity with two T4 bacteriophage gene products, RNA ligase and polynucleotide kinase. This AcMNPV gene has been designated pnk/pnl but has yet to be assigned a function in virus replication. It has been classified as an immediate early virus gene, since the promoter was active in uninfected insect cells and mRNA transcripts were detectable from 4 to 48 h post-infection and in the presence of cycloheximide or aphidicolin in virus-infected cells. The extremities of the transcript have been mapped by primer extension and 3' RACE-PCR to positions -18 from the translational start codon and +15 downstream of the stop codon. The function of pnk/pnl was investigated by producing a recombinant virus (Acdel86lacZ) with the coding region replaced with that of lacZ. This virus replicated normally in Spodoptera frugiperda (Sf 21) cells, indicating that pnk/pnl is not essential for propagation in these cells. Virus protein production in Acdel86lacZ-infected Sf 21 cells also appeared to be unaffected, with normal synthesis of the IE-1, GP64, VP39 and polyhedrin proteins. Shut-down of host protein synthesis was not abolished in recombinant infection. When other baculovirus genomes were examined for the presence of pnk/pnl by restriction enzyme digestion and PCR, a deletion was found in AcMNPV 1.2, Galleria mellonella NPV (GmMNPV) and Bombyx mori NPV (BmNPV), suggesting that in many isolates this gene has either never been acquired or has been lost during genome evolution. This is one of the first baculovirus immediate early genes that appears to be nonessential for virus survival.

  6. Supine or prone position for mini-PNL procedure: does it matter.

    PubMed

    Tokatlı, Zafer; Gokce, Mehmet Ilker; Süer, Evren; Sağlam, Remzi

    2015-06-01

    In this study it is aimed to compare the success and complication rates of mini-PNL procedure in supine and prone positions. In this retrospective study data of 180 patients treated with MPNL either in supine (n = 54) or prone (n = 126) positions between May 2009 and August 2014 was investigated. Success was defined as no visible stones >2 mm. Perioperative complications were classified using the modified Clavien system. Groups were compared with Chi square test or Student t test and for statistical significance p value of 0.05 was accepted. Mean age of the population was 42.5 ± 8.2 years and mean stone size was 23.9 ± 4.1 mm. The two groups were similar with regard to demographic characteristics and stone related characteristics except the ASA status. Success rates of the supine and prone groups were 85.1 and 87.3%, respectively (p = 0.701). No statistically significant differences in terms of complications were observed. Mean operative time was the only parameter different between the two groups (55 vs 82 min, p = 0.001). Supine position for PNL seems to be promising and the complication and success rates are shown to be similar to the prone position with MPNL technique. The only significant benefit of this technique is shorter operative time.

  7. Annotated bibliography of radioactive waste management publications at Pacific Northwest Laboratory, January 1978 through July 1982. [831 abstracts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-09-01

    This bibliography lists publications (831 abstracts) from the Pacific Northwest Laboratory's Department of Energy sponsored research and development programs from January 1978 through July of 1982. The abstracts are grouped in subject categories, as shown in the table of contents. Entries in the subject index also facilitate access by subject, e.g., High-Level Radioactive Wastes. Three indexes, each preceded by a brief description, are provided: personal author, subject, and report number. Cited are research reports, journal articles, books, patents, theses, and conference papers. Excluded are technical progress reports. Since 1978 the Nuclear Waste Management Quarterly Progress Report has been published undermore » the series number PNL-3000. Beginning in 1982, this publication has been issued semiannually, under the series number PNL-4250. This bibliography is the successor to two others, BNWL-2201 (covering the years 1965-1976) and PNL-4050 (1975-1978). It is intended to provide a useful reference to literature in waste management written or compiled by PNL staff.« less

  8. Renal access in PNL under sonographic guidance: Do we really need to insert an open end ureteral catheter in dilated renal systems? A prospective randomized study.

    PubMed

    Eryildirim, Bilal; Tuncer, Murat; Camur, Emre; Ustun, Fatih; Tarhan, Fatih; Sarica, Kemal

    2017-10-03

    To evaluate the true necessity of open end ureteral catheter insertion in patients with moderate to severe pelvicalyceal system dilation treated with percutaneous nephrolithotomy (PNL) under sonographic guidance. 50 cases treated with PNL under sonographic guidance in prone position for solitary obstructing renal stones were evaluated. Patients were randomly divided into two groups; Group 1: Patients in whom a open end ureteral catheter was inserted prior to the procedure; Group 2: Patients receiving no catheter before PNL. In addition to the duration of the procedure as a whole and also all relevant stages as well, radiation exposure time, hospitalization period, mean nephrostomy tube duration, mean drop in Hb levels and all intra and postoperative complications have been evaluated. Mean size of the stones was 308.5 ± 133.2 mm2. Mean total duration of the PNL procedure in cases with open end ureteral catheter was significantly longer than the other cases (p < 0.001). Evaluation of the outcomes of the PNL procedures revealed no statistically significant difference between two groups regarding the stone-free rates (86% vs 84%). Additionally, there was no significant difference with respect to the duration of nephrostomy tube, hospitalization period and secondary procedures needed, complication rates as well as the post-operative Hb drop levels in both groups (p = 0.6830). Our results indicate that the placement of an open end ureteral catheter prior to a PNL procedure performed under sonographic access may not be indicated in selected cases presenting with solitary obstructing renal pelvic and/or calyceal stones.

  9. Treatment of small lower pole calculi--SWL vs. URS vs. PNL?

    PubMed

    Knoll, Thomas; Tasca, Andrea; Buchholz, Noor P

    2011-03-01

    According to current guideline recommendations extracorporeal shock wave lithotripsy (SWL) remains the first choice treatment for small and mid-sized renal calculi. However, the results of SWL treatment for lower pole stones can be disappointing whilst more invasive endoscopic modalities, such as flexible ureterorenoscopy (fURS) and percutaneous nephrolithotomy (PNL) are often considered more effective. This article summarizes a point-counterpoint discussion at the 9th eULIS symposium in Como, Italy, and discusses the potential advantages and disadvantages of the different therapeutic approaches.

  10. Validation of a novel cost effective easy to produce and durable in vitro model for kidney-puncture and PNL-Simulation.

    PubMed

    Klein, Jan Thorsten; Rassweiler, Jens; Rassweiler-Seyfried, Marie-Claire Charlotte

    2018-03-29

    Nephrolithiasis is one of the most common diseases in urology. According to the EAU Guidelines, a percutaneous nephrolitholapaxy (PNL) is recommended when treating a kidney stone >2 cm. Nowadays PNL is performed even for smaller stones (<1 cm) using miniaturized instruments. The most challenging part of any PNL is the puncture of the planned site. PNL-novice surgeons need to practice this step in a safe environment with an ideal training model. We developed and evaluated a new, easy to produce, in-vitro model for the training of the freehand puncture of the kidney. Porcine kidneys with ureters were embedded in ballistic gel. Food coloring and preservative agent were added. We used the standard imaging modalities of X-ray and ultrasound to validate the training model. An additional new technique, the iPAD guided puncture, was evaluated. Five novices and three experts conducted 12 punctures for each imaging technique. Puncture time, radiation dose, and number of attempts to a successful puncture were measured. Mann-Whitney-U, Kruskal-Wallis, and U-Tests were used for statistical analyses. The sonographic guided puncture is slightly but not significantly faster than the fluoroscopic guided puncture and the iPAD assisted puncture. Similarly, the most experienced surgeon's time for a successful puncture was slightly less than that of the residents, and the experienced surgeons needed the least attempts to perform a successful puncture. In terms of radiation exposure, the residents had a significant reduction of radiation exposure compared to the experienced surgeons. The newly developed ballistic gel kidney-puncture model is a good training tool for a variety of kidney puncture techniques, with good content, construct, and face validity.

  11. Laboratory equipment maintenance contracts.

    PubMed

    Boudreau, D A; Scheer, W D; Catrou, P G

    1985-12-01

    The increasing level of technical sophistication and complexity found in clinical laboratory instrumentation today more than ever demands careful attention to maintenance service needs. The time-worn caution for careful definition of requirements for acquisition of a system should also carry over to acquisition of maintenance service. Guidelines are presented for specifications of terms and conditions for maintenance service from the perspective of the laboratorian in the automated clinical laboratory.

  12. Sequence of pNL194, a 79.3-Kilobase IncN Plasmid Carrying the blaVIM-1 Metallo-β-Lactamase Gene in Klebsiella pneumoniae▿

    PubMed Central

    Miriagou, V.; Papagiannitsis, C. C.; Kotsakis, S. D.; Loli, A.; Tzelepi, E.; Legakis, N. J.; Tzouvelekis, L. S.

    2010-01-01

    The nucleotide sequence of pNL194, a VIM-1-encoding plasmid, is described in this study. pNL194 (79,307 bp) comprised an IncN-characteristic segment (38,940 bp) and a mosaic structure (40,367 bp) including blaVIM-1, aacA7, aadA1, aadA2, dfrA1, dfrA12, aphA1, strA, strB, and sul1. Tn1000 or Tn5501 insertion within fipA probably facilitated recruitment of additional mobile elements carrying resistance genes. PMID:20660690

  13. Tale of a Performance Contract

    ERIC Educational Resources Information Center

    Berson, Minnie Perrin

    1971-01-01

    Excerpts from Texarkana and Gary: A Tale of Two Performance Contracts," Childhood Education Magazine, March 1971; reports on observations made during visit to Gary, Indiana, school under contract to Behavioral Research Laboratories. (RT)

  14. Pacific Northwest Laboratory annual report for 1992 to the DOE Office of Energy Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grove, L.K.

    1993-03-01

    The 1992 Annual Report from Pacific Northwest Laboratory (PNL) to the US Department of Energy (DOE) describes research in environment and health conducted during fiscal year 1992. This report consists of four volumes oriented to particular segments of the PNL program, describing research performed for the DOE Office of Health and Environmental Research in the Office of Energy Research. The parts of the 1992 Annual Report are: Biomedical Sciences; Environmental Sciences; Atmospheric Sciences; and Physical Sciences. This Report is Part II: Environmental Sciences. Included in this report are developments in Subsurface Science, Terrestrial Science, Laboratory-Directed Research and Development, Interactions withmore » Educational Institutions, Technology Transfer, Publications, and Presentations. The research is directed toward developing a fundamental understanding of subsurface and terrestrial systems as a basis for both managing these critical resources and addressing environmental problems such as environmental restoration and global change. The Technology Transfer section of this report describes a number of examples in which fundamental research is laying the groundwork for the technology needed to resolve important environmental problems. The Interactions with Educational Institutions section of the report illustrates the results of a long-term, proactive program to make PNL facilities available for university and preuniversity education and to involve educational institutions in research programs. The areas under investigation include the effect of geochemical and physical phenomena on the diversity and function of microorganisms in deep subsurface environments, ways to address subsurface heterogeneity, and ways to determine the key biochemical and physiological pathways (and DNA markers) that control nutrient, water, and energy dynamics in arid ecosystems and the response of these systems to disturbance and climatic change.« less

  15. Pacific Northwest Laboratory annual report for 1990 to the DOE Office of Energy Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, J.F.

    This report summarizes progress on OHER human health, biological, and general life sciences research programs conducted at PNL in FY 1990. The research develops the knowledge and scientific principles necessary to identify understand, and anticipate the long-term health consequences of energy-related radiation and chemicals. Our continuing emphasis is to decrease the uncertainty of health risk estimates from existing and developing energy-related technologies through an increased of understanding of how radiation and chemicals cause biological damage. The sequence of this report of PNL research reflects the OHER programmatic structure. The first section, on human health research, concerns epidemiological and statistical studiesmore » for assessing health risks. The next section contains reports of biological research in laboratory animals and in vitro cell systems, including research with radionuclides and chemicals. The general life sciences research section reports research conducted for the OHER human genome research program.« less

  16. Pacific Northwest Laboratory annual report for 1992 to the DOE Office of Energy Research. Part 2, Environmental sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grove, L.K.; Wildung, R.E.

    1993-03-01

    The 1992 Annual Report from Pacific Northwest Laboratory (PNL) to the US Department of Energy (DOE) describes research in environment and health conducted during fiscal year 1992. This report consists of four volumes oriented to particular segments of the PNL program, describing research performed for the DOE Office of Health and Environmental Research in the Office of Energy Research. The parts of the 1992 Annual Report are: Biomedical Sciences; Environmental Sciences; Atmospheric Sciences; and Physical Sciences. This Report is Part 2: Environmental Sciences. Included in this report are developments in Subsurface Science, Terrestrial Science, Laboratory-Directed Research and Development, Interactions withmore » Educational Institutions, Technology Transfer, Publications, and Presentations. The research is directed toward developing a fundamental understanding of subsurface and terrestrial systems as a basis for both managing these critical resources and addressing environmental problems such as environmental restoration and global change. The Technology Transfer section of this report describes a number of examples in which fundamental research is laying the groundwork for the technology needed to resolve important environmental problems. The Interactions with Educational Institutions section of the report illustrates the results of a long-term, proactive program to make PNL facilities available for university and preuniversity education and to involve educational institutions in research programs. The areas under investigation include the effect of geochemical and physical phenomena on the diversity and function of microorganisms in deep subsurface environments, ways to address subsurface heterogeneity, and ways to determine the key biochemical and physiological pathways (and DNA markers) that control nutrient, water, and energy dynamics in arid ecosystems and the response of these systems to disturbance and climatic change.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Pacific Northwest Laboratory (PNL), operated by Battelle Memorial Institute under contract to the U.S. Department of Energy, operates tank systems for the U.S. Department of Energy, Richland Operations Office (DOE-RL), that contain dangerous waste constituents as defined by Washington State Department of Ecology (WDOE) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-040(18). Chapter 173-303-640(2) of the WAC requires the performance of integrity assessments for each existing tank system that treats or stores dangerous waste, except those operating under interim status with compliant secondary containment. This Integrity Assessment Plan (IAP) identifies all tasks that will be performed during the integritymore » assessment of the PNL-operated Radioactive Liquid Waste Systems (RLWS) associated with the 324 and 325 Buildings located in the 300 Area of the Hanford Site. It describes the inspections, tests, and analyses required to assess the integrity of the PNL RLWS (tanks, ancillary equipment, and secondary containment) and provides sufficient information for adequate budgeting and control of the assessment program. It also provides necessary information to permit the Independent, Qualified, Registered Professional Engineer (IQRPE) to approve the integrity assessment program.« less

  18. 48 CFR 927.303 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... is a domestic small business or nonprofit organization as defined at (FAR) 48 CFR 27.301, except... contracts for the management and operation of DOE laboratories and production facilities. (b) DOE shall not... its rights in an identified invention pursuant to 10 CFR part 784, contracting officers shall consult...

  19. An exploratory investigation of the translation of Pacific Northwest Laboratory`s print manuals system to an on-line manuals system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Hunt, S.T.; Pond, L.R.

    1992-06-01

    Information management technology has proliferated in the past decade in response to the information explosion. As documentation accumulates, the need to access information residing in manuals, handbooks and regulations conveniently, accurately, and quickly has increased. However, studies show that only fractions of the available information is read (Martin, 1978). Consequently, one of the biggest challenges in linking information and electronic management of information is to use the power of communication technology to meet the information needs of the audience. Pacific Northwest Laboratories` (PNL) investigation of translating its print manual system to an on-line system fits this challenge precisely. PNL`s manualsmore » contain a tremendous amount of information for which manual holders are responsible. To perform their tasks in compliance with policy and procedure guidelines, users need to access information accurately, conveniently, and quickly. In order to select and use information management tools wisely, answers must be sought to a few basic questions. Communication experts cite four key questions: What do users want? What do users need? What characteristics of an on-line information system affect its usefulness? Who are the users whose wants and needs are to be met? Once these questions are answered, attention can be focused on finding the best match between user requirements and technology characteristics and weighing the costs and benefits of proposed options.« less

  20. Histopathological examination of nerve samples from pure neural leprosy patients: obtaining maximum information to improve diagnostic efficiency.

    PubMed

    Antunes, Sérgio Luiz Gomes; Chimelli, Leila; Jardim, Márcia Rodrigues; Vital, Robson Teixeira; Nery, José Augusto da Costa; Corte-Real, Suzana; Hacker, Mariana Andréa Vilas Boas; Sarno, Euzenir Nunes

    2012-03-01

    Nerve biopsy examination is an important auxiliary procedure for diagnosing pure neural leprosy (PNL). When acid-fast bacilli (AFB) are not detected in the nerve sample, the value of other nonspecific histological alterations should be considered along with pertinent clinical, electroneuromyographical and laboratory data (the detection of Mycobacterium leprae DNA with polymerase chain reaction and the detection of serum anti-phenolic glycolipid 1 antibodies) to support a possible or probable PNL diagnosis. Three hundred forty nerve samples [144 from PNL patients and 196 from patients with non-leprosy peripheral neuropathies (NLN)] were examined. Both AFB-negative and AFB-positive PNL samples had more frequent histopathological alterations (epithelioid granulomas, mononuclear infiltrates, fibrosis, perineurial and subperineurial oedema and decreased numbers of myelinated fibres) than the NLN group. Multivariate analysis revealed that independently, mononuclear infiltrate and perineurial fibrosis were more common in the PNL group and were able to correctly classify AFB-negative PNL samples. These results indicate that even in the absence of AFB, these histopathological nerve alterations may justify a PNL diagnosis when observed in conjunction with pertinent clinical, epidemiological and laboratory data.

  1. Pacific Northwest Laboratory annual report for 1993 to the DOE Office of Energy Research. Part 2: Environmental sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This 1993 Annual Report from Pacific Northwest Laboratory (PNL) to the US DOE describes research in environment and health conducted during fiscal year (FY) 1993. The report is divided into four parts, each in a separate volume. This part, Volume 2, covers Environmental Sciences. The research is directed toward developing a fundamental understanding of subsurface and terrestrial systems as a basis for both managing these critical resources and addressing environmental problems such as environmental restoration and global change. There are sections on Subsurface Science, Terrestrial Science, Technology Transfer, Interactions with Educational Institutions, and Laboratory Directed Research and Development.

  2. Pacific Northwest Laboratory annual report for 1980 to the DOE Assistant Secretary for Environment. Part 5. Environmental assessment, control, health and safety

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baalman, R.W.; Hays, I.D.

    1981-02-01

    Pacific Northwest Laboratory's (PNL) 1980 annual report to the DOE Assistant Secretary for Environment describes research in environment, health, and safety conducted during fiscal year 1980. Part 5 includes technology assessments for natural gas, enhanced oil recovery, oil shale, uranium mining, magnetic fusion energy, solar energy, uranium enrichment and industrial energy utilization; regional analysis studies of environmental transport and community impacts; environmental and safety engineering for LNG, oil spills, LPG, shale oil waste waters, geothermal liquid waste disposal, compressed air energy storage, and nuclear/fusion fuel cycles; operational and environmental safety studies of decommissioning, environmental monitoring, personnel dosimetry, and analysis ofmore » criticality safety; health physics studies; and epidemiological studies. Also included are an author index, organization of PNL charts and distribution lists of the annual report, along with lists of presentations and publications. (DLS)« less

  3. Uninvolved versus target muscle contraction during contract: relax proprioceptive neuromuscular facilitation stretching.

    PubMed

    Azevedo, Daniel Camara; Melo, Raphael Marques; Alves Corrêa, Ricardo Vidal; Chalmers, Gordon

    2011-08-01

    The purpose of this study was to compare the acute effect of the contract-relax (CR) stretching technique on knee active range of motion (ROM) using target muscle contraction or an uninvolved muscle contraction. pre-test post-test control experimental design. Clinical research laboratory. Sixty healthy men were randomly assigned to one of three groups. The Contract-Relax group (CR) performed a traditional hamstring CR stretch, the Modified Contract-Relax group (MCR) performed hamstring CR stretching using contraction of an uninvolved muscle distant from the target muscle, and the Control group (CG) did not stretch. Active knee extension test was performed before and after the stretching procedure. Two-way between-within analysis of variance (ANOVA) results showed a significant interaction between group and pre-test to post-test (p < 0.001). Post-hoc examination of individual groups showed no significant change in ROM for the CG (0.8°, p = 0.084), and a significant moderate increase in ROM for both the CR (7.0°, p < 0.001) and MCR (7.0°, p < 0.001) groups. ROM gain following a CR PNF procedure is the same whether the target stretching muscle is contracted, or an uninvolved muscle is contracted. Copyright © 2011 Elsevier Ltd. All rights reserved.

  4. 48 CFR 1523.303-72 - Care of laboratory animals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Care of laboratory animals... Material and Material Safety Data 1523.303-72 Care of laboratory animals. Contracting officers shall insert the clause at 1552.223-72, Care of Laboratory Animals, in all contracts involving the use of...

  5. 48 CFR 1523.303-72 - Care of laboratory animals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Care of laboratory animals... Material and Material Safety Data 1523.303-72 Care of laboratory animals. Contracting officers shall insert the clause at 1552.223-72, Care of Laboratory Animals, in all contracts involving the use of...

  6. 48 CFR 1523.303-72 - Care of laboratory animals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Care of laboratory animals... Material and Material Safety Data 1523.303-72 Care of laboratory animals. Contracting officers shall insert the clause at 1552.223-72, Care of Laboratory Animals, in all contracts involving the use of...

  7. 48 CFR 1523.303-72 - Care of laboratory animals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Care of laboratory animals... Material and Material Safety Data 1523.303-72 Care of laboratory animals. Contracting officers shall insert the clause at 1552.223-72, Care of Laboratory Animals, in all contracts involving the use of...

  8. Simulation for analysis and control of superplastic forming. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zacharia, T.; Aramayo, G.A.; Simunovic, S.

    1996-08-01

    A joint study was conducted by Oak Ridge National Laboratory (ORNL) and the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy-Lightweight Materials (DOE-LWM) Program. the purpose of the study was to assess and benchmark the current modeling capabilities with respect to accuracy of predictions and simulation time. Two modeling capabilities with respect to accuracy of predictions and simulation time. Two simulation platforms were considered in this study, which included the LS-DYNA3D code installed on ORNL`s high- performance computers and the finite element code MARC used at PNL. both ORNL and PNL performed superplastic forming (SPF) analysis on amore » standard butter-tray geometry, which was defined by PNL, to better understand the capabilities of the respective models. The specific geometry was selected and formed at PNL, and the experimental results, such as forming time and thickness at specific locations, were provided for comparisons with numerical predictions. Furthermore, comparisons between the ORNL simulation results, using elasto-plastic analysis, and PNL`s results, using rigid-plastic flow analysis, were performed.« less

  9. Pacific Northwest Laboratory annual report for 1989 to the DOE Office of Energy Research - Part 1: Biomedical Sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, J.F.

    This report summarizes progress on OHER human health, biological, general life sciences, and medical applications research programs conducted at PNL in FY 1989. The research develops the knowledge and scientific principles necessary to identify, understand, and anticipate the long-term health consequences of energy-related radiation and chemicals. Our continuing emphasis is to decrease the uncertainty of health risk estimates from existing and developing energy-related technologies through an increased understanding of how radiation and chemicals cause biological damage. The sequence of this report of PNL research reflects the OHER programmatic structure. The first section, on human health research, concerns statistical and epidemiologicalmore » studies for assessing health risks. The next section contains reports of biological research in laboratory animals and in vitro cell systems, including research with radionuclides and chemicals. The general life sciences research section reports research conducted for the OHER human genome research program, and the medical applications section summarizes commercial radioisotope production and distribution activities at DOE facilities. 6 refs., 50 figs., 35 tabs.« less

  10. Low crustal velocities and mantle lithospheric variations in southern Tibet from regional Pnl waveforms

    NASA Astrophysics Data System (ADS)

    Rodgers, Arthur J.; Schwartz, Susan Y.

    We report low average crustal P-wave velocities (5.9-6.1 km/s, Poisson's ratio 0.23-0.27, thickness 68-76 km) in southern Tibet from modelling regional Pnl waveforms recorded by the 1991-1992 Tibetan Plateau Experiment. We also find that the mantle lithosphere beneath the Indus-Tsangpo Suture and the Lhasa Terrane is shield-like (Pn velocity 8.20-8.25 km/s, lid thickness 80-140 km, positive velocity gradient 0.0015-0.0025 s-1). Analysis of relative Pn travel time residuals requires a decrease in the mantle velocities beneath the northern Lhasa Terrane, the Banggong-Nujiang Suture and the southern Qiangtang Terrane. Tectonic and petrologic considerations suggest that low bulk crustal velocities could result from a thick (50-60 km) felsic upper crust with vertically limited and laterally pervasive partial melt. These results are consistent with underthrusting of Indian Shield lithosphere beneath the Tibetan Plateau to at least the central Lhasa Terrane.

  11. Pacific Northwest Laboratory annual report for 1993 to the DOE Office of Energy Research. Part 1: Biomedical Sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lumetta, C.C.; Park, J.F.

    1994-03-01

    This report summarizes FY 1993 progress in biological and general life sciences research programs conducted for the Department of Energy`s Office of Health and Environmental REsearch (OHER) at Pacific Northwest Laboratory (PNL). This research provides knowledge of fundamental principles necessary to identify, understand, and anticipate the long-term health consequences of exposure to energy-related radiation and chemicals. The Biological Research section contains reports of studies using laboratory animals, in vitro cell systems, and molecular biological systems. This research includes studies of the impact of radiation, radionuclides, and chemicals on biological responses at all levels of biological organization. The General Life Sciencesmore » Research section reports research conducted for the OHER human genome program.« less

  12. Implementation of Good Clinical Laboratory Practice (GCLP) guidelines within the External Quality Assurance Program Oversight Laboratory (EQAPOL).

    PubMed

    Todd, Christopher A; Sanchez, Ana M; Garcia, Ambrosia; Denny, Thomas N; Sarzotti-Kelsoe, Marcella

    2014-07-01

    The EQAPOL contract was awarded to Duke University to develop and manage global proficiency testing programs for flow cytometry-, ELISpot-, and Luminex bead-based assays (cytokine analytes), as well as create a genetically diverse panel of HIV-1 viral cultures to be made available to National Institutes of Health (NIH) researchers. As a part of this contract, EQAPOL was required to operate under Good Clinical Laboratory Practices (GCLP) that are traditionally used for laboratories conducting endpoint assays for human clinical trials. EQAPOL adapted these guidelines to the management of proficiency testing programs while simultaneously incorporating aspects of ISO/IEC 17043 which are specifically designed for external proficiency management. Over the first two years of the contract, the EQAPOL Oversight Laboratories received training, developed standard operating procedures and quality management practices, implemented strict quality control procedures for equipment, reagents, and documentation, and received audits from the EQAPOL Central Quality Assurance Unit. GCLP programs, such as EQAPOL, strengthen a laboratory's ability to perform critical assays and provide quality assessments of future potential vaccines. © 2013.

  13. When routine D-J implantation necessary during PNL?

    PubMed

    Bayrak, Omer; Seckiner, Ilker; Erturhan, Sakip M; Bulut, Ersan; Demirbag, Asaf; Erbagci, Asaf

    2015-03-01

    We investigated the characteristics of patients who underwent Double-J catheter (D-J) implantation, the risk factors for prolonged urine leakage (PUL), and prediction of patients who require medical treatment. The data of 535 adult patients who underwent PNL due to kidney stone disease between January 2005 and December 2011 in our clinic were analyzed retrospectively. Patients were divided into 2 groups: Group 1 (n=77) (14.39%) included patients with Double-J catheter due to prolonged (> 24 h) urinary leakage and Group 2 (n=458) (85.61%) patients without urinary leakage. The mean stone burden was 951.94 ± 539.09 mm2 in Group 1, and 676.35 ±296.65 mm2 in Group 2 (p<0.05). DJ catheter was implanted in 11.33% of the patients with stone burden below 1000 mm2 versus in 51.21% of the patients with stone burden above 1000 mm2. In Group 1, the number of patients with two or more accesses performed was 18.18, whereas in Group 2 it was 8.5% (p<0.05). Among all patients, DJ implantation was performed in 13.07% of patients with a single access versus 26.41% of patients with two or more accesses. Also, DJ catheter was implanted in 41.46%of patients with residual stones versus 12.14% of stone-free patients. Three patients with stone burden above 1000 mm2, two or more accesses, and residual stone, all of them required DJ implantation. DJ implantation due to PUL had approximately 5-fold increase stone burden above 1000 mm2, 2-fold increase in patients undergoing two or more access and 3-fold increase in patients with residual stones. Therefore, we think that the D-J implantation is highly advisable in case of a stone load above 1000 mm2, two or more accesses, and in patients with residual stones.

  14. Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether-Linked Nitramines

    DTIC Science & Technology

    2016-07-01

    ARL-TR-7706 ● JULY 2016 US Army Research Laboratory Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether...JULY 2016 US Army Research Laboratory Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether-Linked Nitramines by...YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) July 2016 2. REPORT TYPE Final 3. DATES COVERED (From - To) Fiscal Year 2013 4. TITLE

  15. Design and Calibration of the US Army Research Laboratory (ARL) Closed Loop Laboratory Radio Frequency (RF) Propagation Section

    DTIC Science & Technology

    2016-10-01

    ARL-TR-7860 ● OCT 2016 US Army Research Laboratory Design and Calibration of the US Army Research Laboratory (ARL) Closed Loop ...ARL-TR-7860 ● OCT 2016 US Army Research Laboratory Design and Calibration of the US Army Research Laboratory (ARL) Closed Loop Laboratory...Design and Calibration of the US Army Research Laboratory (ARL) Closed Loop Laboratory Radio Frequency (RF) Propagation Section 5a. CONTRACT NUMBER

  16. Geomorphic Modeling of Macro-Tidal Embayment with Extensive Tidal Flats: Skagit Bay, Washington

    DTIC Science & Technology

    2010-09-30

    Geomorphic modeling of macro-tidal embayment with extensive tidal flats: Skagit Bay , Washington Lyle Hibler Battelle-Pacific Northwest Division...Marine Sciences Laboratory Sequim , WA 98382 phone: (360) 681-3616 fax: (360) 681-4559 email: lyle.hibler@pnl.gov Adam Maxwell Battelle-Pacific...Northwest Division Marine Sciences Laboratory Sequim , WA 98382 phone: (360) 681-4591 fax: (360) 681-4559 email: adam.maxwell@pnl.gov Award

  17. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  18. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  19. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  20. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  1. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  2. Performance testing of radiobioassay laboratories: In vivo measurements, Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacLellan, J.A.; Traub, R.J.; Olsen, P.C.

    1990-04-01

    A study of two rounds of in vivo laboratory performance testing was undertaken by Pacific Northwest Laboratory (PNL) to determine the appropriateness of the in vivo performance criteria of draft American National Standards Institute (ANSI) standard ANSI N13.3, Performance Criteria for Bioassay.'' The draft standard provides guidance to in vivo counting facilities regarding the sensitivity, precision, and accuracy of measurements for certain categories of commonly assayed radionuclides and critical regions of the body. This report concludes the testing program by presenting the results of the Round Two testing. Testing involved two types of measurements: chest counting for radionuclide detection inmore » the lung, and whole body counting for detection of uniformly distributed material. Each type of measurement was further divided into radionuclide categories as defined in the draft standard. The appropriateness of the draft standard criteria by measuring a laboratory's ability to attain them were judged by the results of both round One and Round Two testing. The testing determined that performance criteria are set at attainable levels, and the majority of in vivo monitoring facilities passed the criteria when complete results were submitted. 18 refs., 18 figs., 15 tabs.« less

  3. Laboratory Manual, Electrical Engineering 25.

    ERIC Educational Resources Information Center

    Syracuse Univ., NY. Dept. of Electrical Engineering.

    Developed as part of a series of materials in the electrical engineering sequence developed under contract with the United States Office of Education, this laboratory manual provides nine laboratory projects suitable for a second course in electrical engineering. Dealing with resonant circuits, electrostatic fields, magnetic devices, and…

  4. Muscle Contraction.

    PubMed

    Sweeney, H Lee; Hammers, David W

    2018-02-01

    SUMMARYMuscle cells are designed to generate force and movement. There are three types of mammalian muscles-skeletal, cardiac, and smooth. Skeletal muscles are attached to bones and move them relative to each other. Cardiac muscle comprises the heart, which pumps blood through the vasculature. Skeletal and cardiac muscles are known as striated muscles, because the filaments of actin and myosin that power their contraction are organized into repeating arrays, called sarcomeres, that have a striated microscopic appearance. Smooth muscle does not contain sarcomeres but uses the contraction of filaments of actin and myosin to constrict blood vessels and move the contents of hollow organs in the body. Here, we review the principal molecular organization of the three types of muscle and their contractile regulation through signaling mechanisms and discuss their major structural and functional similarities that hint at the possible evolutionary relationships between the cell types. Copyright © 2018 Cold Spring Harbor Laboratory Press; all rights reserved.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Department of Energy Order DOE 5000.4A establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 5000.4A, LDRD is ``research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this Order. LDRD includes activities previously defined as ER&D, as well as other discretionary research and development activities not provided for in amore » DOE program.`` Consistent with the Mission Statement and Strategic Plan provided in PNL`s Institutional Plan, the LDRD investments are focused on developing new and innovative approaches in research related to our ``core competencies.`` Currently, PNL`s core competencies have been identified as integrated environmental research; process technology; energy systems research. In this report, the individual summaries of Laboratory-level LDRD projects are organized according to these core competencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. A significant proportion of PNL`s LDRD funds are also allocated to projects within the various research centers that are proposed by individual researchers or small research teams. The projects are described in Section 2.0. The projects described in this report represent PNL`s investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. In accordance with DOE guidelines, the report provides an overview of PNL`s LDRD program and the management process used for the program and project summaries for each LDRD project.« less

  6. Contracting with the Frederick National Laboratory | Frederick National Laboratory for Cancer Research

    Cancer.gov

    Our Acquisitions Directorate supports the national laboratory with high quality products and services to achieve its national mission. In addition to engaging large subcontractors, we are also committed to working with small businesses, minority- and

  7. 48 CFR 970.1504-1-3 - Special considerations: Laboratory management and operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: Laboratory management and operation. 970.1504-1-3 Section 970.1504-1-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-3 Special considerations: Laboratory management and operation. (a) For the management...

  8. Air Force Research Laboratory

    DTIC Science & Technology

    2009-06-08

    Air Force Research Laboratory 8 June 2009 Mr. Leo Marple Ai F R h L b t r orce esearc a ora ory Leo.Marple@wpafb.af.mil DISTRIBUTION STATEMENT A...TITLE AND SUBTITLE Air Force Research Laboratory 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER...5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Air Force Research Laboratory ,Wright

  9. 41 CFR 101-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Laboratory and research...-General Policies § 101-25.109 Laboratory and research equipment. (a) This section prescribes controls for use by Federal agencies in managing laboratory and research equipment in Federal laboratories...

  10. 41 CFR 101-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Laboratory and research...-General Policies § 101-25.109 Laboratory and research equipment. (a) This section prescribes controls for use by Federal agencies in managing laboratory and research equipment in Federal laboratories...

  11. 41 CFR 101-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Laboratory and research...-General Policies § 101-25.109 Laboratory and research equipment. (a) This section prescribes controls for use by Federal agencies in managing laboratory and research equipment in Federal laboratories...

  12. LABORATORY MISCONDUCT - WHAT CAN HAPPEN TO YOU?

    EPA Science Inventory

    Contracted laboratories perform a vast number of routine and special analytical services that are the foundation of decisions upon which rests the fate of the environment. Guiding these laboratories in the generation of environmental data has been the analytical protocols and ...

  13. Meier associates and Pacific Northwest Laboratory staff exchange: Transfer of corrosion monitoring expertise to assess and develop in-line inspection tools for corrosion control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olson, N.J.; Meier, T.E.

    1995-04-01

    Staff exchanges, such as the one described in this report, are intended to facilitate communication and collaboration among scientists and engineers at DOE laboratories, in US industry, and academia. During the past 5 years, PNL has developed prototype instrumentation to automate the data collection required for electrochemical determination of corrosion rates and behavior of materials in various electrically conductive environments. The last version is labeled the Sentry 100 prototype corrosion data scanner. Applications include these in the pulp and paper industry and at hazardous waste sites.

  14. Pension fund activities at Department laboratories managed by the University of California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-18

    The Department of Energy`s (Department) Office of Contractor Human Resource Management, and San Francisco and Albuquerque Field Offices have responsibility for contract administration of the Department`s interest in two separate pension plans covering University of California (University) employees at Lawrence Livermore National Laboratory, Lawrence Berkeley Laboratory, and Los Alamos National Laboratory. The purpose of the audit was to review the Department`s contract administration of its interest in those pension plans.

  15. Electrochemical noise measurements of sustained microbially influenced pitting corrosion in a laboratory flow loop system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lin, Y.; Frank, J.R.; St. Martin, E.J.

    Because of the chaotic nature of the corrosion process and the complexity of the electrochemical noise signals that are generated, there is no generally accepted method of measuring and interpreting these signals that allows the consistent detection and identification of sustained localized pitting (SLP) as compared to general corrosion. The authors have reexamined electrochemical noise analysis (ENA) of localized corrosion using different hardware, signal collection, and signal processing designs than those used in conventional ENA techniques. The new data acquisition system was designed to identify and monitor the progress of SLP by analyzing the power spectral density (PSD) of themore » trend of the corrosion current noise level (CNL) and potential noise level (PNL). Each CNL and PNL data point was calculated from the root-mean-square value of the ac components of current and potential fluctuation signals, which were measured simultaneously during a short time period. The PSD analysis results consistently demonstrated that the trends of PNL and CNL contain information that can be used to differentiate between SLP and general corrosion mechanisms. The degree of linear slope in the low-frequency portion of the PSD analysis was correlated with the SLP process. Laboratory metal coupons as well as commercial corrosion probes were tested to ensure the reproducibility and consistency of the results. The on-line monitoring capability of this new ENA method was evaluated in a bench-scale flow-loop system, which simulated microbially influenced corrosion (MIC) activity. The conditions in the test flow-loop system were controlled by the addition of microbes and different substrates to favor accelerated corrosion. The ENA results demonstrated that this in-situ corrosion monitoring system could effectively identify SLP corrosion associated with MIC, compared to a more uniform general corrosion mechanism. A reduction in SLP activity could be clearly detected by the ENA

  16. Electrochemical noise measurements of sustained microbially influenced pitting corrosion in a laboratory flow loop system.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lin, Y. J.

    Because of the chaotic nature of the corrosion process and the complexity of the electrochemical noise signals that are generated, there is no generally accepted method of measuring and interpreting these signals that allows the consistent detection and identification of sustained localized pitting (SLP) as compared to general corrosion. We have reexamined electrochemical noise analysis (ENA) of localized corrosion using different hardware, signal collection, and signal processing designs than those used in conventional ENA techniques. The new data acquisition system was designed to identify and monitor the progress of SLP by analyzing the power spectral density (PSD) of the trendmore » of the corrosion current noise level (CNL) and potential noise level (PNL). Each CNL and PNL data point was calculated from the root-mean- square value of the ac components of current and potential fluctuation signals, which were measured simultaneously during a short time period. The PSD analysis results consistently demonstrated that the trends of PNL and CNL contain information that can be used to differentiate between SLP and general corrosion mechanisms. The degree of linear slope in the low-frequency portion of the PSD analysis was correlated with the SLP process. Laboratory metal coupons as well as commercial corrosion probes were tested to ensure the reproducibility and consistency of the results. The on-line monitoring capability of this new ENA method was evaluated in a bench-scale flow-loop system, which simulated microbially influenced corrosion (MIC) activity. The conditions in the test flow-loop system were controlled by the addition of microbes and different substrates to favor accelerated corrosion. The ENA results demonstrated that this in-situ corrosion monitoring system could effectively identify SLP corrosion associated with MIC, compared to a more uniform general corrosion mechanism. A reduction in SLP activity could be clearly detected by the ENA monitoring

  17. Network Science Research Laboratory (NSRL) Discrete Event Toolkit

    DTIC Science & Technology

    2016-01-01

    ARL-TR-7579 ● JAN 2016 US Army Research Laboratory Network Science Research Laboratory (NSRL) Discrete Event Toolkit by...Laboratory (NSRL) Discrete Event Toolkit by Theron Trout and Andrew J Toth Computational and Information Sciences Directorate, ARL...Research Laboratory (NSRL) Discrete Event Toolkit 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Theron Trout

  18. LANDSAT TM image data quality analysis for energy-related applications

    NASA Technical Reports Server (NTRS)

    Wukelic, G. E.; Foote, H. P.; Petrie, G. M.; Barnard, J. C.; Eliason, J. R.

    1985-01-01

    This project represents a no-cost agreement between National Aeronautic Space Administration Goddard Space Flight Center (NASA GSFC) and the Pacific Northwest Laboratory (PNL). PNL is a Department of Energy (DOE) national laboratory operted by Battelle Memorial Institute at its Pacific Northwest Laboratories in Richland, Washington. The objective of this investigation is to evaluate LANDSAT's thematic mapper (TM) data quality and utility characteristics from an energy research and technological perspective. Of main interest is the extent to which repetitive TM data might support DOE efforts relating to siting, developing, and monitoring energy-related facilities, and to basic geoscientific research. The investigation utilizes existing staff and facility capabilities, and ongoing programmatic activities at PNL and other DOE national laboratories to cooperatively assess the potential usefulness of the improved experimental TM data. The investigation involves: (1) both LANDSAT 4 and 5 TM data, (2) qualitative and quantitative use consideration, and 3) NASA P (corrected) and A (uncorrected) CCT analysis for a variety of sites of DOE interest. Initial results were presented at the LANDSAT Investigator's Workshops and at specialized LANDSAT TM sessions at various conferences.

  19. Bigelow BEAM Contract

    NASA Image and Video Library

    2013-01-16

    NASA Deputy Administrator Lori Garver and President and founder of Bigelow Aerospace Robert T. Bigelow, announce a planned addition to the International Space Station that will use the orbiting laboratory to test expandable space habitat technology during a press conference held at Bigelow Aerospace on Wednesday, Jan. 16, 2013 in Las Vegas. The $17.8 million contract with Bigelow Aerospace will provide a Bigelow Expandable Activity Module (BEAM), which is scheduled to arrive at the space station in 2015 for a two-year technology demonstration. Photo Credit: (NASA/Bill Ingalls)

  20. 41 CFR 101-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipped and/or used for scientific research, testing, or analysis, except clinical laboratories operating... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Laboratory and research...-General Policies § 101-25.109 Laboratory and research equipment. (a) This section prescribes controls for...

  1. 48 CFR 1552.223-72 - Care of laboratory animals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Care of laboratory animals... Care of laboratory animals. As prescribed in 1523.303-72, insert the following clause: Care of Laboratory Animals (OCT 2000) (a) Before undertaking performance of any contract involving the use of...

  2. 48 CFR 1552.223-72 - Care of laboratory animals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Care of laboratory animals... Care of laboratory animals. As prescribed in 1523.303-72, insert the following clause: Care of Laboratory Animals (OCT 2000) (a) Before undertaking performance of any contract involving the use of...

  3. 48 CFR 1552.223-72 - Care of laboratory animals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Care of laboratory animals... Care of laboratory animals. As prescribed in 1523.303-72, insert the following clause: Care of Laboratory Animals (OCT 2000) (a) Before undertaking performance of any contract involving the use of...

  4. 48 CFR 1552.223-72 - Care of laboratory animals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Care of laboratory animals... Care of laboratory animals. As prescribed in 1523.303-72, insert the following clause: Care of Laboratory Animals (OCT 2000) (a) Before undertaking performance of any contract involving the use of...

  5. 48 CFR 1552.223-72 - Care of laboratory animals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Care of laboratory animals... Care of laboratory animals. As prescribed in 1523.303-72, insert the following clause: Care of Laboratory Animals (OCT 2000) (a) Before undertaking performance of any contract involving the use of...

  6. 41 CFR 109-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Laboratory and research equipment. 109-25.109 Section 109-25.109 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND...

  7. Technology transfer personnel exchange at the Boeing Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Antoniak, Z.I.

    1993-03-01

    The objective of the exchange was to transfer Pacific Northwest Laboratory (PNL) technology and expertise in advanced ceramic fabric composites (ACFC) to the Boeing Defense & Space Group (Boeing Aerospace). Boeing Aerospace was especially interested in applying PNL-developed ACFC technology to its current and future spacecraft and space missions. Boeing has on-going independent research and development (R&D) programs on advanced radiators and heat pipes, therefore, PNL research in ceramic fabric heat pipes was of particular interest to Boeing. Thus, this exchange assisted in the transfer of PNL`s ACFC heat pipe technology and other, related research capabilities to private industrial application.more » The project was proposed as an initial step in building a long-term collaborative relationship between Boeing and PNL that may result in future Cooperative Research and Development Agreements (CRADAs) and/or other types of collaborative efforts.« less

  8. Technology transfer personnel exchange at the Boeing Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Antoniak, Z.I.

    1993-03-01

    The objective of the exchange was to transfer Pacific Northwest Laboratory (PNL) technology and expertise in advanced ceramic fabric composites (ACFC) to the Boeing Defense Space Group (Boeing Aerospace). Boeing Aerospace was especially interested in applying PNL-developed ACFC technology to its current and future spacecraft and space missions. Boeing has on-going independent research and development (R D) programs on advanced radiators and heat pipes, therefore, PNL research in ceramic fabric heat pipes was of particular interest to Boeing. Thus, this exchange assisted in the transfer of PNL's ACFC heat pipe technology and other, related research capabilities to private industrial application.more » The project was proposed as an initial step in building a long-term collaborative relationship between Boeing and PNL that may result in future Cooperative Research and Development Agreements (CRADAs) and/or other types of collaborative efforts.« less

  9. Six Strategies for Chemical Waste Minimization in Laboratories.

    ERIC Educational Resources Information Center

    Matteson, Gary C.; Hadley, Cheri R.

    1991-01-01

    Guidelines are offered to research administrators for reducing the volume of hazardous laboratory waste. Suggestions include a chemical location inventory, a chemical reuse facility, progressive contracts with chemical suppliers, internal or external chemical recycling mechanisms, a "chemical conservation" campaign, and laboratory fees for…

  10. Contract Audit Followup: Its Impact on Defense Contracting.

    DTIC Science & Technology

    1983-12-01

    NOTES Contract Auditor Disposition of Contract Audit Reports Contracting Officer Independent Role of Contracting Officer Contract Audit Report Overaged...fundamental shift in the relationship between the contracting officer and contract auditor , strengthening the auditor’s role while eroding the...the indepen- .1 ident role of the contracting officer; (2) attracts unneces- sary attention to the contracting officer/ auditor relationship; (3) imposes

  11. 48 CFR 352.270-5 - Care of laboratory animals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Care of laboratory animals... of laboratory animals. (a) As prescribed in 370.403(a), the Contracting Officer shall insert the... on Humane Care and Use of Laboratory Animals (January 2006) The Public Health Service (PHS) Policy on...

  12. 48 CFR 352.270-5 - Care of laboratory animals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Care of laboratory animals... of laboratory animals. (a) As prescribed in 370.403(a), the Contracting Officer shall insert the... on Humane Care and Use of Laboratory Animals (January 2006) The Public Health Service (PHS) Policy on...

  13. 48 CFR 352.270-5 - Care of laboratory animals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Care of laboratory animals... of laboratory animals. (a) As prescribed in 370.403(a), the Contracting Officer shall insert the... on Humane Care and Use of Laboratory Animals (January 2006) The Public Health Service (PHS) Policy on...

  14. 48 CFR 352.270-5 - Care of laboratory animals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Care of laboratory animals... of laboratory animals. (a) As prescribed in 370.403(a), the Contracting Officer shall insert the... on Humane Care and Use of Laboratory Animals (January 2006) The Public Health Service (PHS) Policy on...

  15. 48 CFR 352.270-5 - Care of laboratory animals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Care of laboratory animals... of laboratory animals. (a) As prescribed in 370.403(a), the Contracting Officer shall insert the... on Humane Care and Use of Laboratory Animals (January 2006) The Public Health Service (PHS) Policy on...

  16. 41 CFR 109-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Laboratory and research... PROCUREMENT 25-GENERAL 25.1-General Policies § 109-25.109 Laboratory and research equipment. The provisions of 41 CFR 101-25.109 and this section apply to laboratory and research equipment in the possession of...

  17. Laboratory Demonstrations for PDE and Metals Combustion at NASA MSFC's Advanced Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Report provides status reporting on activities under order no. H-30549 for the period December 1 through December 31, 1999. Details the activities of the contract in the coordination of planned conduct of experiments at the MSFC Advanced Propulsion Laboratory in pulse detonation MHD power production and metals combustion.

  18. Pacific Northwest Laboratory annual report for 1990 to the DOE Office of Energy Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owczarski, E.L.

    At the start of FY 1990, the atmospheric sciences and carbon dioxide research programs within the Office of Health and Environmental Research (OHER) were gathered into the new Atmospheric and Climate Research Division (ACRD). One of the central missions of this new division is to provide the Department of Energy with scientifically defensible information on the local, regional, and global distributions of energy-related pollutants and their effects on climate. This information is vital to the definition and implementation of a sound national energy strategy. Because much of the work done at PNL during FY 1990 falls under the umbrella ofmore » the new ACRD, we are including in this volume the progress and status reports for all OHER atmospheric and climate research projects at PNL. The description of ongoing atmospheric and climate research at PNL is organized along two broad research areas; atmospheric research and climate research. This report describes the progress in FY 1990 in each of these areas. A divider page summarizes the goals of each area and lists projects that support research activities.« less

  19. Organic Analytical Service within the Superfund Contract Laboratory Program

    EPA Pesticide Factsheets

    This page contains information about the SOM02.4 statement of work for the analysis of organic compounds at hazardous waste sites. The SOW contains the analytical method and contractual requirements for laboratories.

  20. Inorganic Analytical Service within the Superfund Contract Laboratory Program

    EPA Pesticide Factsheets

    This page contains information about the ISM02.4 statement of work for the analysis of metals and cyanide at hazardous waste sites. The SOW contains the analytical method and contractual requirements for laboratories.

  1. An exploratory investigation of the translation of Pacific Northwest Laboratory's print manuals system to an on-line manuals system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Hunt, S.T.; Pond, L.R.

    1992-06-01

    Information management technology has proliferated in the past decade in response to the information explosion. As documentation accumulates, the need to access information residing in manuals, handbooks and regulations conveniently, accurately, and quickly has increased. However, studies show that only fractions of the available information is read (Martin, 1978). Consequently, one of the biggest challenges in linking information and electronic management of information is to use the power of communication technology to meet the information needs of the audience. Pacific Northwest Laboratories' (PNL) investigation of translating its print manual system to an on-line system fits this challenge precisely. PNL's manualsmore » contain a tremendous amount of information for which manual holders are responsible. To perform their tasks in compliance with policy and procedure guidelines, users need to access information accurately, conveniently, and quickly. In order to select and use information management tools wisely, answers must be sought to a few basic questions. Communication experts cite four key questions: What do users want What do users need What characteristics of an on-line information system affect its usefulness Who are the users whose wants and needs are to be met Once these questions are answered, attention can be focused on finding the best match between user requirements and technology characteristics and weighing the costs and benefits of proposed options.« less

  2. Solar buildings program contract summary, calendar year 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2000-06-07

    The mission of the US Department of Energy's Solar Buildings Program is to advance the development and widespread deployment of competitive solar thermal technologies for use in buildings. The long-term goal of the Program is to combine solar energy technologies with energy-efficient construction techniques and create cost-effective buildings that have a zero net need for fossil fuel energy on an annual basis. The Solar Buildings Program conducts research and development on solar technologies that can deliver heat, light, and hot water to residential and commercial buildings. By working closely with manufacturers in both the buildings and solar energy industries andmore » by supporting research at universities and national laboratories, the Solar Buildings Program brings together the diverse players developing reliable and affordable solar technologies for building applications. The National Renewable Energy Laboratory (NREL) in Golden, Colorado, and Sandia National Laboratories (SNL) in Albuquerque, New Mexico, jointly participate in the Solar Buildings Program. These two national laboratories work closely with industry researching new concepts, developing technology improvements, reducing manufacturing costs, monitoring system performance, promoting quality assurance, and identifying potential new markets. In calendar year 1999, the Solar Buildings Program focused primarily on solar hot water system research and development (R and D), US industry manufacturing assistance, and US market assistance. The Program also completed a number of other projects that were begun in earlier years. This Contract Summary describes the Program's contracted activities that were active during 1999.« less

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, A.G.

    The Pacific Northwest Laboratory (PNL)/Analytical Chemistry Laboratory (ACL) and the Westinghouse Hanford Company (WHC)/Process Analytical Laboratory (PAL) provide analytical support services to various environmental restoration and waste management projects/programs at Hanford. In response to a US Department of Energy -- Richland Field Office (DOE-RL) audit, which questioned the comparability of analytical methods employed at each laboratory, the Sample Exchange/Exchange (SEE) program was initiated. The SEE Program is a selfassessment program designed to compare analytical methods of the PAL and ACL laboratories using sitespecific waste material. The SEE program is managed by a collaborative, the Quality Assurance Triad (Triad). Triad membershipmore » is made up of representatives from the WHC/PAL, PNL/ACL, and WHC Hanford Analytical Services Management (HASM) organizations. The Triad works together to design/evaluate/implement each phase of the SEE Program.« less

  4. Safety in the Chemical Laboratory

    ERIC Educational Resources Information Center

    Steere, Norman V., Ed.

    1975-01-01

    The National Fire Protection Association has proposed national standards dealing with laboratory operations, ventilation, chemical handling and storage, compressed gases, fire prevention, and emergency procedures. The standards are likely to be used as guidelines by insurance companies, and governmental agencies that award grants and contracts for…

  5. National Water Quality Laboratory Profile

    USGS Publications Warehouse

    Raese, Jon W.

    1994-01-01

    The National Water Quality Laboratory determines organic and inorganic constituents in samples of surface and ground water, river and lake sediment, aquatic plant and animal material, and precipitation collected throughout the United States and its territories by the U.S. Geological Survey. In water year 1994, the Laboratory produced more than 900,000 analytical results for about 65,000 samples. The Laboratory also coordinates an extensive network of contract laboratories for the determination of radiochemical and stable isotopes and work for the U.S. Department of Defense Environmental Contamination Hydrology Program. Heightened concerns about water quality and about the possible effects of toxic chemicals at trace and ultratrace levels have contributed to an increased demand for impartial, objective, and independent data.

  6. Pension fund activities at Department laboratories managed by the University of California. [Contains Management and Auditor Comments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-18

    The Department of Energy's (Department) Office of Contractor Human Resource Management, and San Francisco and Albuquerque Field Offices have responsibility for contract administration of the Department's interest in two separate pension plans covering University of California (University) employees at Lawrence Livermore National Laboratory, Lawrence Berkeley Laboratory, and Los Alamos National Laboratory. The purpose of the audit was to review the Department's contract administration of its interest in those pension plans.

  7. [Study on the immunization status and its influencing factors among workers from the polio network laboratories in China].

    PubMed

    Guo, Y S; Wang, J Q; Xu, C; Liu, Y N; He, X H; Wei, Q

    2017-06-10

    Objective: To Investigate the immune status and influencing factors of provincial polio network laboratory (PNL) workers in China so as to provide evidence for the development of related strategies to protect personnel working at the PNLs. Methods: All the practitioners from the PNLs at the provincial centers for disease control, were selected as objects for this study, from October to December, 2016, under a questionnaire survey. Information on status of immunity and influencing factors was collected, with SAS software, trend chi-square used for statistics analysis. Results: A total of 77 workers were involved in this survey, with 60 (78 % ) of them completed the polio-based immune program but the rest 17 (22 % ) remained records unclear. 66 people (about 86 % ) remembered clearly that they had received vaccination when engaging in the polio-lab work, but the rest 11 (14 % ) with only partial vaccination records. We also noticed that the Influencing factors realted to vaccination status were: age ( χ (2)=2.48, P <0.05), title ( χ (2)=2.51, P <0.05), years of employment ( P <0.000 1), education ( χ (2)=0.74, P =0.46) and gender ( χ (2)=0.46, P =0.50). Conclusion: Immune status of the Chinese provincial PNL practitioners appeared fairly good as 86 % of all the workers had received polio-related vaccination, with 41 % of them completed a 3-time inoculation program, when started working in this field.

  8. Activities of the Jet Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Work accomplished by the Jet Propulsion Laboratory (JPL) under contract to NASA in 1985 is described. The work took place in the areas of flight projects, space science, geodynamics, materials science, advanced technology, defense and civil programs, telecommunications systems, and institutional activities.

  9. Financial incentives and the supply of laboratory tests.

    PubMed

    Carlsen, Fredrik; Grytten, Jostein; Skau, Irene

    2003-11-01

    This study examined how the number of laboratory tests taken by a sample of Norwegian contract physicians is influenced by their private economy outside of the practice and by changes in remuneration. The data are drawn from 40,000 consultations carried out by 44 contract physicians in 1991-1994. Two factors which led to changes in the level of physicians' income are considered: changes in remuneration for consultations and laboratory tests and changes in interest rates on loans and bank deposits. The effect which changes in interest rates have on physicians' disposable income was calculated using information about their financial assets and debts obtained from tax assessments. The main finding was that changes in private economy and changes in remuneration have no or only a small effect on the number of laboratory tests taken. Our results suggest that fee regulation can be an effective means of controlling physicians' income and therefore government expenditure on primary physician services.

  10. 48 CFR 1335.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1335.006 Contracting methods and... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contracting methods and... research services under the contract might involve the use of human subjects. The provision is mandatory...

  11. Guidance, Navigation and Control Digital Emulation Technology Laboratory. Volume 1. Part 2. Task 1: Digital Emulation Technology Laboratory

    DTIC Science & Technology

    1991-09-27

    AD-A241 692 II I] II I11 ANNUAL REPORT VOLUME 1 PART 2 TASK 1: DIGITAL EMULATION TECHNOLOGY LABORATOIRY REPORT NO. AR-0142-91-001 September 27, 1991... DIGITAL EMULATION TECHNOLOGY LABORATORY Contract No. DASG60-89-C-0142 Sponsored By The United States Army ? trategic Defense Command COMPUTER...ANNUAL REPORT VOLUME 1 PART 2 TASK 1: DIGITAL EMULATION TECHNOLOGY LABORATORY September 27, 1991 Authors Thomas R. Collins and Stephen R. Wachtel

  12. 42 CFR 434.6 - General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under this part must include all of the following: 434.6 Section... contracts and subcontracts.P>(a) Contracts. All contracts under this part must include all of the following...

  13. Teaching Contracts with Contracts

    ERIC Educational Resources Information Center

    Misner, Robert L.

    1977-01-01

    The teaching of contracts law is an area that lends itself easily to introducing students to realistic factual situations. An exercise is described in which students were assigned to separate "firms" with volunteers from the later law school classes as clients. Each firm was responsible for submitting a signed contract and an accompanying paper.…

  14. The Observation of Fault Finiteness and Rapid Velocity Variation in Pnl Waveforms for the Mw 6.5, San Simeon, California Earthquake

    NASA Astrophysics Data System (ADS)

    Konca, A. O.; Ji, C.; Helmberger, D. V.

    2004-12-01

    We observed the effect of the fault finiteness in the Pnl waveforms from regional distances (4° to 12° ) for the Mw6.5 San Simeon Earthquake on 22 December 2003. We aimed to include more of the high frequencies (2 seconds and longer periods) than the studies that use regional data for focal solutions (5 to 8 seconds and longer periods). We calculated 1-D synthetic seismograms for the Pn_l portion for both a point source, and a finite fault solution. The comparison of the point source and finite fault waveforms with data show that the first several seconds of the point source synthetics have considerably higher amplitude than the data, while finite fault does not have a similar problem. This can be explained by reversely polarized depth phases overlapping with the P waves from the later portion of the fault, and causing smaller amplitudes for the beginning portion of the seismogram. This is clearly a finite fault phenomenon; therefore, can not be explained by point source calculations. Moreover, the point source synthetics, which are calculated with a focal solution from a long period regional inversion, are overestimating the amplitude by three to four times relative to the data amplitude, while finite fault waveforms have the similar amplitudes to the data. Hence, a moment estimation based only on the point source solution of the regional data could have been wrong by half of magnitude. We have also calculated the shifts of synthetics relative to data to fit the seismograms. Our results reveal that the paths from Central California to the south are faster than to the paths to the east and north. The P wave arrival to the TUC station in Arizona is 4 seconds earlier than the predicted Southern California model, while most stations to the east are delayed around 1 second. The observed higher uppermost mantle velocities to the south are consistent with some recent tomographic models. Synthetics generated with these models significantly improves the fits and the

  15. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  16. Electronic Warfare Closed Loop Laboratory (EWCLL) Antenna Motor Software and Hardware Development

    DTIC Science & Technology

    2016-09-01

    ARL-TN-0779 ● SEP 2016 US Army Research Laboratory Electronic Warfare Closed Loop Laboratory (EWCLL) Antenna Motor Software and...Electronic Warfare Closed Loop Laboratory (EWCLL) Antenna Motor Software and Hardware Development by Neal Tesny Sensors and Electron Devices Directorate...TITLE AND SUBTITLE Electronic Warfare Closed Loop Laboratory (EWCLL) Antenna Motor Software and Hardware Development 5a. CONTRACT NUMBER 5b

  17. Nanoscience and Technology at the Air Force Research Laboratory (AFRL)

    DTIC Science & Technology

    2005-05-01

    AIR FORCE RESEARCH LABORATORY ( AFRL ) Dr. Richard A. Vaia Dr. Daniel Miracle Dr. Thomas Cruse Air Force Research ...Technology At The Air Force Research Laboratory ( AFRL ) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT...98) Prescribed by ANSI Std Z39-18 AFRL NST Overview 2 AIR FORCE RESEARCH LABORATORY VISION We defend

  18. Nanoscience and Technology at the Air Force Research Laboratory (AFRL)

    DTIC Science & Technology

    2005-02-01

    AIR FORCE RESEARCH LABORATORY ( AFRL ) Dr. Richard A. Vaia Dr. Daniel Miracle Dr. Thomas Cruse Air Force Research ...Technology At The Air Force Research Laboratory ( AFRL ) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT...98) Prescribed by ANSI Std Z39-18 AFRL NST Overview 2 AIR FORCE RESEARCH LABORATORY VISION We defend

  19. Contracts.

    ERIC Educational Resources Information Center

    Gellert, Shepard D.; Wilson, Grace

    1977-01-01

    This paper reviews experimental psychology goal research and its implications for the therapist doing contract therapy. Clinical examples of various levels of contracts give illustrations, and a technique, the therapeutic double bind, as a form of contract, is detailed. A case study is presented to illustrate the use of the theory. Three…

  20. Relational Contract: Applicable to Department of Defense Contracts

    DTIC Science & Technology

    1989-12-01

    examine the evolution of contract law and, in particular, the role of contractual incompleteness in exchange relationships. 2.1.1. The Classical Approach...Classical contract law facilitates exchange by separately detailing all aspects of the contracting process 9 at the outset by prespecification of all...modifications after contractual performance has begun. According to Williamson (1979), classical contract law implements prespecification through legal

  1. Federal Security Laboratory Governance Panels: Observations and Recommendations

    DTIC Science & Technology

    2013-01-01

    operates under a sole-source, cost-plus-fixed-fee contract administered by the U.S. Navy’s Naval Sea Systems Command. There are currently 14 UARCs, 13... system of research organizations that support science and technology for U.S. national security. Within this system , the Departments of Defense, Energy...and Homeland Security support about 80 laboratories that focus predominantly on national security matters. These laboratories have different

  2. The Virtual Robotics Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kress, R.L.; Love, L.J.

    The growth of the Internet has provided a unique opportunity to expand research collaborations between industry, universities, and the national laboratories. The Virtual Robotics Laboratory (VRL) is an innovative program at Oak Ridge National Laboratory (ORNL) that is focusing on the issues related to collaborative research through controlled access of laboratory equipment using the World Wide Web. The VRL will provide different levels of access to selected ORNL laboratory secondary education programs. In the past, the ORNL Robotics and Process Systems Division has developed state-of-the-art robotic systems for the Army, NASA, Department of Energy, Department of Defense, as well asmore » many other clients. After proof of concept, many of these systems sit dormant in the laboratories. This is not out of completion of all possible research topics. but from completion of contracts and generation of new programs. In the past, a number of visiting professors have used this equipment for their own research. However, this requires that the professor, and possibly his/her students, spend extended periods at the laboratory facility. In addition, only a very exclusive group of faculty can gain access to the laboratory and hardware. The VRL is a tool that enables extended collaborative efforts without regard to geographic limitations.« less

  3. US Army Research Laboratory and University of Notre Dame Distributed Sensing: Hardware Overview

    DTIC Science & Technology

    2017-11-01

    ARL-TR-8199 ● NOV 2017 US Army Research Laboratory US Army Research Laboratory and University of Notre Dame Distributed Sensing...US Army Research Laboratory US Army Research Laboratory and University of Notre Dame Distributed Sensing: Hardware Overview by Roger P...TITLE AND SUBTITLE US Army Research Laboratory and University of Notre Dame Distributed Sensing: Hardware Overview 5a. CONTRACT NUMBER 5b. GRANT

  4. Slurry spray distribution within a simulated laboratory scale spray dryer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bertone, P.C.

    1979-12-20

    It was found that the distribution of liquid striking the sides of a simulated room temperature spray dryer was not significantly altered by the choice of nozles, nor by a variation in nozzle operating conditions. Instead, it was found to be a function of the spray dryer's configuration. A cocurrent flow of air down the drying cylinder, not possible with PNL's closed top, favorably altered the spray distribution by both decreasing the amount of liquid striking the interior of the cylinder from 72 to 26% of the feed supplied, and by shifting the zone of maximum impact from 1.0 tomore » 1.7 feet from the nozzle. These findings led to the redesign of the laboratory scale spray dryer to be tested at the Savannah River Plant. The diameter of the drying chamber was increased from 5 to 8 inches, and a cocurrent flow of air was established with a closed recycle. Finally, this investigation suggested a drying scheme which offers all the advantages of spray drying without many of its limitations.« less

  5. Contraction induced h reflexes in the diagnosis of cervical radiculopathy.

    PubMed

    Bodofsky, Elliot B; Campellone, Joseph V; Cohen, Stephen J; Caten, Holly N; Schindelheim, Adam M

    2015-06-01

    To determine whether Contraction Induced H Reflexes (CIHR) can accurately detect cervical radiculopathy. Comparison of CIHR results with Needle Electromyography at academic outpatient Electromyography/Nerve Conduction laboratories. Participants were all patients over 18 with a needle electromyography diagnosis of cervical radiculopathy. Patients were tested for CIHR in at least two upper extremity muscles in electromyographically proven myotomes bilaterally. Patients were requested to perform a moderate contraction while stimulus was applied proximally (elbow or Erb's point). Outcome measures included H Reflex onset latency and side-to-side latency differences. These were compared against previously established normal values. Overall, 10 of 15 patients who met criteria for cervical radiculopathy showed CIHR abnormalities (sensitivity = 67%; 95% confidence interval, 43-91). Counting each side and level separately, CIHR identified 16/27 radiculopathies (sensitivity = 59.2%; 95% confidence interval, 40.6-77.8). Contraction Induced H Reflexes identified 1 possible radiculopathy not seen on electromyography (specificity = 98%; 95% confidence interval, 95-100). Contraction induced H Reflexes have a sensitivity and specificity for cervical radiculopathy similar to the resting Gastroc-Soleus H Reflex.

  6. Specification Section 01065S ES&H for Service Contracts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirsch, Greg C.

    2014-07-01

    Section Includes: Requirements and guidelines in performance of work concerning protection of environment and property, and the safety and health of Contractors, Sandia National Laboratories (SNL) and Department of Energy (DOE) employees, visitors to SNL, and members of the public. This Section is applicable only to Service Contracts that do not involve construction or construction-like activities. Construction and construction-like activities are covered by Section 01065, Environment, Safety and Health (ES&H) for Construction Contracts. The entire ES&H program shall focus on safe-by-design intent, understanding the technical basis for the work, identifying and controlling energy sources, unacceptable consequences, risk assessments, and positivemore » verification.« less

  7. Electromyographic evaluation of abdominal-muscle function with and without concomitant pelvic-floor-muscle contraction.

    PubMed

    Tahan, Nahid; Arab, Amir Massoud; Vaseghi, Bita; Khademi, Khosro

    2013-05-01

    Coactivation of abdominal and pelvic-floor muscles (PFM) is an issue considered by researchers recently. Electromyography (EMG) studies have shown that the abdominal-muscle activity is a normal response to PFM activity, and increase in EMG activity of the PFM concomitant with abdominal-muscle contraction was also reported. The purpose of this study was to compare the changes in EMG activity of the deep abdominal muscles during abdominal-muscle contraction (abdominal hollowing and bracing) with and without concomitant PFM contraction in healthy and low-back-pain (LBP) subjects. A 2 × 2 repeated-measures design. Laboratory. 30 subjects (15 with LBP, 15 without LBP). Peak rectified EMG of abdominal muscles. No difference in EMG of abdominal muscles with and without concomitant PFM contraction in abdominal hollowing (P = .84) and abdominal bracing (P = .53). No difference in EMG signal of abdominal muscles with and without PFM contraction between LBP and healthy subjects in both abdominal hollowing (P = .88) and abdominal bracing (P = .98) maneuvers. Adding PFM contraction had no significant effect on abdominal-muscle contraction in subjects with and without LBP.

  8. Chemical kinetics as a contract sport

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kolb, C.E.

    1990-01-01

    Earlier in this century chemical kinetics was a basic physical chemistry research topic widely pursued in leading academic chemistry departments. Chemical kinetics now appears to be a discipline practiced chiefly for its applications to societal problems. The chemical kinetics activities directed by D.M. Golden at SRI International are strikingly successful in generating data for key applied problems while at the same time advancing our understanding of chemical kinetics as a scientific discipline. In this talk, the author will contrast the chemical kinetics activities in two contract R D laboratories, one on the right side of the U.S. (ARI) and themore » other on the left (SRI). Their approach to common applied problems ranging from stratospheric heterogeneous kinetics to plasma etching systems for semiconductor processing will be compared and contrasted. Empirically discovered Golden Rules for the pursuit of quality chemical kinetics research in a contract R D environment will be presented and discussed.« less

  9. Beverly Hayes | Frederick National Laboratory for Cancer Research

    Cancer.gov

    Employee name: Bev Hayes Directorate: Management Operations Department or lab: Contracts and Acquisitions How many years have you worked at the Frederick National Laboratory? Four months going on one year! Job responsibilities: With the C&A manageme

  10. Expanding Energy Performance Contracting in china: policy solutions and market mechanisms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shen, Bo; Price, Lynn; Liu, Xu

    Energy performance contracting is an important market mechanism that uses energy savings to pay over time for the upfront costs of energy efficiency retrofits in buildings, industries, and other types of facilities. Through energy performance contracts (EPCs), Energy Service Companies (ESCOs) play an important role in implementing energy efficiency retrofits. Both China and the United States have large markets for EPCs and significant opportunities for growth. The Chinese government has made great efforts in promoting the country’s ESCO business and expanding its EPC markets. This paper makes a series of recommendations for China to adopt more ambitious policy measures tomore » encourage deep energy savings projects via EPCs. These recommendations are built on initial insights from a white paper developed by researchers at the Pacific Northwest National Laboratory and the Lawrence Berkeley National Laboratory with the assistance from the ESCO Committee of China’s Energy Conservation Association (EMCA). Key recommendations are listed below.« less

  11. 40 CFR 160.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Applicability to studies performed under grants and contracts. 160.10 Section 160.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS General Provisions § 160.10...

  12. 40 CFR 792.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Applicability to studies performed under grants and contracts. 792.10 Section 792.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS General...

  13. Polymorphic Contracts

    NASA Astrophysics Data System (ADS)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  14. 46 CFR 190.05-20 - Segregation of chemical laboratories and chemical storerooms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Segregation of chemical laboratories and chemical... chemical laboratories and chemical storerooms. (a) The provisions of this section shall apply to all vessels contracted for on or after March 1, 1968. (b) Chemical storerooms shall not be located in...

  15. 46 CFR 190.05-20 - Segregation of chemical laboratories and chemical storerooms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Segregation of chemical laboratories and chemical... chemical laboratories and chemical storerooms. (a) The provisions of this section shall apply to all vessels contracted for on or after March 1, 1968. (b) Chemical storerooms shall not be located in...

  16. 46 CFR 190.05-20 - Segregation of chemical laboratories and chemical storerooms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Segregation of chemical laboratories and chemical... chemical laboratories and chemical storerooms. (a) The provisions of this section shall apply to all vessels contracted for on or after March 1, 1968. (b) Chemical storerooms shall not be located in...

  17. 46 CFR 190.05-20 - Segregation of chemical laboratories and chemical storerooms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Segregation of chemical laboratories and chemical... chemical laboratories and chemical storerooms. (a) The provisions of this section shall apply to all vessels contracted for on or after March 1, 1968. (b) Chemical storerooms shall not be located in...

  18. 46 CFR 190.05-20 - Segregation of chemical laboratories and chemical storerooms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Segregation of chemical laboratories and chemical... chemical laboratories and chemical storerooms. (a) The provisions of this section shall apply to all vessels contracted for on or after March 1, 1968. (b) Chemical storerooms shall not be located in...

  19. The Construction of Defense Department Contracts in Thin Markets

    DTIC Science & Technology

    2014-04-30

    future rounds of contracting. An example of a good or service with a high degree of specialized investments is the production of flu vaccines ...Producing flu vaccines requires a substantial investment in scientific research (a highly specialized human skill) and specialized laboratories and...equipment. If the purchasing government finds that the flu vaccine it purchases does not meets its needs, then it cannot easily find another vendor

  20. A Theory of Diagnostic Inference: Contract Final Report,

    DTIC Science & Technology

    1983-11-01

    and I-bLications ftlated to this Contract ........ 19 1caml.igmnts and Scientific I&VOuMM1.......................... 21 M&i 2 This report esunarizes our... Comunications Sciences Division Naval Training Equipment Center Code 7500 Orlando, FL 32813 Naval Research Laboratory Washington, D. C. 20375 Dr. Gary...Dr. A. L. Slafkosky Scientific Advisor Commander Commandant of the Marine Corps Naval Electronics Systems Co-and C6de RD-1 Human Factors Engineering

  1. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  2. Resolving Contract Disputes

    DTIC Science & Technology

    1988-11-01

    as part of the required training for Army contracting personnel. Specifically, these were courses in contract administration and contract law offered...courts and boards. The process itself was discussed in very general terms.[7] The AFIT Government Contract Law Course concerns itself with legal concepts...Washington, D.C., 1984 4. . Air Force Institute of Technology, Government Contract Law , Course Manual, Wright-Patterson Air Force Base, Ohio, April

  3. 48 CFR 35.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... indicated a high degree of probability that development is feasible and (2) the Government has determined... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.006 Contracting methods and..., performance objectives, and specifications for the work can be defined will largely determine the type of...

  4. Pacific Northwest Laboratory annual report for 1987 to the DOE Office of Energy Research: Part 1, Biomedical Sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, J.F.

    1988-02-01

    This report summarizes progress on OHER biomedical and health-effects research conducted at Pacific Northwest Laboratory in FY 1987. The research develops the knowledge and scientific principles necessary to identify, understand, and anticipate the long-term health consequences of energy-related radiation and chemicals. Our continuing emphasis is to decrease the uncertainty of health-effects risk estimates from existing and/or developing energy-related technologies through an increased understanding of how radiation and chemicals cause health effects. The report is arranged to reflect PNL research relative to OHER programmatic structure. The first section, on human health effects, concerns statistical and epidemiological studies for assessing health risks.more » The next section, which contains reports of health-effects research in biological systems, includes research with radiation and chemicals. The last section is related to medical applications of nuclear technology.« less

  5. Fracture and matrix hydrologic characteristics of tuffaceous materials from Yucca Mountain, Nye County, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, R.R.; Klavetter, E.A.; Hall, I.J.

    1984-12-01

    The geological formations in the unsaturated zone at Yucca Mountain, on and adjacent to the Nevada Test Site (NTS), are currently being studied for consideration as the host for a radioactive-waste repository; the US Department of Energy is carrying out these studies through the Nevada Nuclear Waste Storage Investigations project. The formations are composed of tuffaceous (tuff) materials that must be evaluated to estimate the rate at which radionuclides would migrate to the accessible environment. According to the available evidence, the flux of water in the unsaturated zone beneath the Yucca Mountain site is low; quantifying such low flow ratesmore » through direct measurements is difficult. To help provide data that can be used to assess unsaturated flow, Pacific Northwest Laboratory (PNL), under contract to Sandia National Laboratories (SNL), performed hydrologic tests on tuffaceous samples from 48 different locations in Yucca Mountain. This report contains the entire set of psychrometer measurements of desaturation curves for tuffs from Yucca Mountain as well as a substantial number of saturated conductivity measurements. 19 references, 132 figures, 23 tables.« less

  6. Experimental animal studies of radon and cigarette smoke

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cross, F.T.; Dagle, G.E.; Gies, R.A.

    Cigarette-smoking is a dominant cause of lung cancer and confounds risk assessment of exposure to radon decay products. Evidence in humans on the interaction between cigarette-smoking and exposure to radon decay products, although limited, indicates a possible synergy. Experimental animal data, in addition to showing synergy, also show a decrease or no change in risk with added cigarette-smoke exposures. This article reviews previous animal data developed at Compagnie Generale des Matieres Nucleaires and Pacific Northwest Laboratory (PNL) on mixed exposures to radon and cigarette smoke, and highlights new initiation-promotion-initiation (IPI) studies at PNL that were designed within the framework ofmore » a two-mutation carcinogenesis model. Also presented are the PNL exposure system, experimental protocols, dosimetry, and biological data observed to date in IPI animals.« less

  7. Notification: Controls Over Results Produced by EPA Independent Laboratories

    EPA Pesticide Factsheets

    Project #OPE-FY16-0022, April 5, 2016. The EPA OIG plans to begin preliminary research on controls that the EPA’s Office of Land and Emergency Management’s Contract Laboratory Program (CLP) has in place to detect or prevent fraud.

  8. An Archeological Overview and Management Plan for the Harry Diamond Laboratories, Adelphi, Maryland.

    DTIC Science & Technology

    1985-07-01

    WORK ON HARRY DIAMOND LABORATORY- ADELPHI, MARYLAND A number of prehistoric and historic sites have been reported in the vicinity of HDLA. Attempts...AD-Rftl 054 AN ARCHEOLOGICAL OVERVIEW AND NANAGENENT PLAN FOR THE Sui HARRY DIAMOND LABORATORIES ADELPHI NARYLRNDCU) U NLRSIFEDENYIROSPHERE CO NEW...An Archeological Overview and Management Plan r ifor the Harry Diamond Laboratories - Adelphi, Maryland Under Contract CX4000-3-0018 with the National

  9. Contracts in radiology practices: contract types and key provisions.

    PubMed

    Muroff, Julie A; Muroff, Lawrence R

    2004-07-01

    A contract between a radiology group and its physician member(s) provides the foundation for the professional relationships in a group practice. The parties are not in positions of parity; contract provisions are structured to maintain the primacy of the group over the individual members. An integration clause should be included to preclude reliance on communications that are not memorialized by the language of the contract. Precise, unambiguous terms must be used to convey the intentions of the parties. The contract should have a clear date of initiation and, if applicable, an effective date of termination. Mechanisms for termination and modification should be expressed clearly to minimize the risk of judicial interference. The method of determining and adjusting the salary and other benefits of the radiologist should be stated, as consideration is necessary to support the existence of a legal contract. The obligations of the radiologist to the practice are often stated in general terms to maximize the group's flexibility. Finally, other key clauses that are discussed in the paper should be incorporated into the contract.

  10. 21 CFR 58.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Applicability to studies performed under grants and contracts. 58.10 Section 58.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... nonclinical laboratory study intended to be submitted to or reviewed by the Food and Drug Administration...

  11. 21 CFR 58.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Applicability to studies performed under grants and contracts. 58.10 Section 58.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... nonclinical laboratory study intended to be submitted to or reviewed by the Food and Drug Administration...

  12. 21 CFR 58.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 1 2013-04-01 2013-04-01 false Applicability to studies performed under grants and contracts. 58.10 Section 58.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... nonclinical laboratory study intended to be submitted to or reviewed by the Food and Drug Administration...

  13. 21 CFR 58.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 1 2012-04-01 2012-04-01 false Applicability to studies performed under grants and contracts. 58.10 Section 58.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... nonclinical laboratory study intended to be submitted to or reviewed by the Food and Drug Administration...

  14. 21 CFR 58.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 1 2014-04-01 2014-04-01 false Applicability to studies performed under grants and contracts. 58.10 Section 58.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... nonclinical laboratory study intended to be submitted to or reviewed by the Food and Drug Administration...

  15. Evaluation of contract time estimation and contracting procedures : technical summary.

    DOT National Transportation Integrated Search

    1996-08-01

    The objective of this research was 1) to provide the DOTD with a systematic approach to the determination of contract duration, and 2) to explore innovative contracting procedures that may prove beneficial in DOTD projects. The innovative contracting...

  16. Hanford Internal Dosimetry Program Manual, PNL-MA-552

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.

    2009-09-24

    This manual is a guide to the services provided by the Hanford Internal Dosimetry Program (IDP), which is operated by the Pacific Northwest National Laboratory.( ) for the U.S. Department of Energy Richland Operations Office, Office of River Protection and their Hanford Site contractors. The manual describes the roles of and relationships between the IDP and the radiation protection programs of the Hanford Site contractors. Recommendations and guidance are also provided for consideration in implementing bioassay monitoring and internal dosimetry elements of radiation protection programs.

  17. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  18. Value added data archiving

    NASA Technical Reports Server (NTRS)

    Berard, Peter R.

    1993-01-01

    Researchers in the Molecular Sciences Research Center (MSRC) of Pacific Northwest Laboratory (PNL) currently generate massive amounts of scientific data. The amount of data that will need to be managed by the turn of the century is expected to increase significantly. Automated tools that support the management, maintenance, and sharing of this data are minimal. Researchers typically manage their own data by physically moving datasets to and from long term storage devices and recording a dataset's historical information in a laboratory notebook. Even though it is not the most efficient use of resources, researchers have tolerated the process. The solution to this problem will evolve over the next three years in three phases. PNL plans to add sophistication to existing multilevel file system (MLFS) software by integrating it with an object database management system (ODBMS). The first phase in the evolution is currently underway. A prototype system of limited scale is being used to gather information that will feed into the next two phases. This paper describes the prototype system, identifies the successes and problems/complications experienced to date, and outlines PNL's long term goals and objectives in providing a permanent solution.

  19. Contracting and Higher Education.

    ERIC Educational Resources Information Center

    Ferris, James M.

    1991-01-01

    The potential gains in efficiency of three types of contracts in college administration are contrasted. Contract types include explicit contracts in the budgeting process between the state and higher education institutions; institutional contracting for inputs; and interinstitutional contracting. The tradeoff between production cost savings and…

  20. High-temperature Y267 epdm elastomer - field and laboratory experiences, August 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hirasuna, A.R.; Friese, G.J.; Stephens, G.A.

    1982-01-01

    During the period 1976 to 1979 L'Garde, Inc. developed geothermal elastomer compounds under a U.S. Department of Energy - Division of Geothermal Energy (DOE-DGE) contract. The resulting developments yielded compounds from 4 polymer systems which successfully exceeded the contract requirements. Since completion of the compound development, significant laboratory and down-hole experience occurred, primarily on the Y267 EPDM compound. This work summarizes those experiences. 11 references.

  1. Paradoxical sphincter contraction is rarely indicative of anismus

    PubMed Central

    Voderholzer, W; Neuhaus, D; Klauser, A; Tzavella, K; Muller-Lissner, S; Schindlbeck, N

    1997-01-01

    Background—Anismus is thought to be a cause of chronic constipation by producing outlet obstruction. The underlying mechanism is paradoxical contraction of the anal sphincter or puborectalis muscle. However, paradoxical sphincter contraction (PSC) also occurs in healthy controls, so anismus may be diagnosed too often because it may be based on a non-specific finding related to untoward conditions during the anorectal examination. 
Aims—To investigate the pathophysiological importance of PSC found at anorectal manometry in constipated patients and in patients with stool incontinence. 
Methods—Digital rectal examination and anorectal manometry were performed in 102 chronically constipated patients, 102 patients with stool incontinence, and in 18 controls without anorectal disease. In 120 of the 222 subjects defaecography was also performed. Paradoxical sphincter contraction was defined as a sustained increase in sphincter pressure during straining. Anismus was assumed when PSC was present on anorectal manometry and digital rectal examination and the anorectal angle did not widen on defaecography. 
Results—Manometric PSC occurred about twice as often in constipated patients as in incontinent patients (41.2% versus 25.5%, p<0.017) and its prevalence was similar in incontinent patients and controls (25.5% versus 22.2%). Oroanal or rectosigmoid transit times in constipated patients with and without PSC did not differ significantly (total 64.6 (8.9) hours versus 54.2 (8.1) hours; rectosigmoid 14.9 (2.4) hours versus 13.8 (2.5) hours). 
Conclusions—Paradoxical sphincter contraction is a common finding in healthy controls as well as in patients with chronic constipation and stool incontinence. Hence, PSC is primarily a laboratory artefact and true anismus is rare. 

 Keywords: anismus; paradoxical sphincter contraction; constipation; stool incontinence; anorectal manometry PMID:9301508

  2. Line Parameters Of CH3CN From 305 To 415 cm-1

    NASA Astrophysics Data System (ADS)

    Brown, Linda R.; Kamadjeu, D. A.; Kleiner, I.; Orphal, J.; Sams, R. L.

    2006-12-01

    Mapping important compounds, such as hydrocarbons and nitriles, is needed in order to understand the photochemical cycle of Titan and how it couples with the dynamics to produce organic aerosols. For this, the CIRS spectrometer (Composite Infrared Spectrometer) on board Cassini is currently recording rotation and vibration-rotation spectra of Titan between 10 and 1400 cm-1. To support analysis of these data, high resolution laboratory spectra of CH3CN have been recorded using Fourier transform spectrometers at PNL and LISA. This paper presents a prediction of line positions and intensities of CH3 CN for the ν&8 fundamental and the 2ν8 -ν8 hot band (located near 360 cm&-1). Analyses of the two fundamentals near 10 microns are in progress. Part of the research described in this paper was performed at the Jet Propulsion Laboratory, California Institute of Technology, under contract with The National Aeronautics and Space Administration. I.K, J. O and A. D. also want to thank the Programme National de Planétologie for funding part of this research. This research was supported, in part, by the United States Department of Energy, Office of Basic Energy Sciences, Chemical Sciences Division and the experimental part was performed at the W. R, Wiley Environmental Molecular Science Laboratory, a national scientific user facility sponsored by the Department of Energy's Office of Biological and Environmental Research located at the Pacific Northwest National Laboratory. Pacific Northwest National Laboratory is operated for the United States Department of Energy by Battelle under contract DE-AC06-76RLO 1830. We wish to thank Drs R. Antilla and S. Alanko for kindly making available supplemental data in electronic and paper forms. #

  3. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  4. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  5. The Fiftieth Anniversary of Brookhaven National Laboratory: A Turbulent Time

    NASA Astrophysics Data System (ADS)

    Bond, Peter D.

    2018-03-01

    The fiftieth anniversary year of Brookhaven National Laboratory was momentous, but for reasons other than celebrating its scientific accomplishments. Legacy environmental contamination, community unrest, politics, and internal Department of Energy issues dominated the year. It was the early days of perhaps the most turbulent time in the lab's history. The consequences resulted in significant changes at the lab, but in addition they brought a change to contracts to manage the Department of Energy laboratories.

  6. The Fiftieth Anniversary of Brookhaven National Laboratory: A Turbulent Time

    NASA Astrophysics Data System (ADS)

    Bond, Peter D.

    2018-06-01

    The fiftieth anniversary year of Brookhaven National Laboratory was momentous, but for reasons other than celebrating its scientific accomplishments. Legacy environmental contamination, community unrest, politics, and internal Department of Energy issues dominated the year. It was the early days of perhaps the most turbulent time in the lab's history. The consequences resulted in significant changes at the lab, but in addition they brought a change to contracts to manage the Department of Energy laboratories.

  7. Contract Actions for Leased Equipment

    DTIC Science & Technology

    1999-06-30

    Fundamentals, Fundamentals of Contract Pricing, and Government Contract Law courses. The additional instruction should emphasize the contracting officers...Contracting Fundamentals, Fundamentals of Contract Pricing, and Government Contract Law courses. This additional instruction should emphasize the important...FAR 107.401 and 207.470 in the Basics of Contracting and Government Contract Law courses, and that price analysis in assessing lease versus purchase

  8. 40 CFR 35.4235 - Are there specific provisions my group's contract(s) must contain?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Suspension and Debarment; (g) The following clauses from 40 CFR 30.48: (1) Remedies for breaches of contract...'s contract(s) must contain? 35.4235 Section 35.4235 Protection of Environment ENVIRONMENTAL... provisions my group's contract(s) must contain? Your group must include the following provisions in each of...

  9. Massachusetts Institute of Technology Artificial Intelligence Laboratory Bibliography.

    ERIC Educational Resources Information Center

    Massachusetts Inst. of Tech., Cambridge. Artificial Intelligence Lab.

    Massachusetts Institute of Technology (MIT) presents a bibliography of more than 350 reports, theses, and papers from its artificial intelligence laboratory. Title, author, and identification number are given for all items, and most also have a date and contract number. Some items are no longer available, and others may be obtained from National…

  10. Contract Learning.

    ERIC Educational Resources Information Center

    Gilbert, Jay

    Academic work carried out through learning contracts at Empire State College is described. Learning contracts are defined and examples are given. Faculty roles, educational advantages, and implementation methods are discussed. (MLH)

  11. 48 CFR 35.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... short-duration fixed-price contract may be useful for developing system design concepts, resolving... contracts as designs become more firmly established, risks are reduced, and production tooling, equipment...

  12. The Goldilocks contract: The synergistic benefits of combining structure and autonomy for persistence, creativity, and cooperation.

    PubMed

    Chou, Eileen Y; Halevy, Nir; Galinsky, Adam D; Murnighan, J Keith

    2017-09-01

    Contracts are commonly used to regulate a wide range of interactions and relationships. Yet relying on contracts as a mechanism of control often comes at a cost to motivation. Integrating theoretical perspectives from psychology, economics, and organizational theory, we explore this control-motivation dilemma inherent in contracts and present the Contract-Autonomy-Motivation-Performance-Structure (CAMPS) model, which highlights the synergistic benefits of combining structure and autonomy. The model proposes that subtle reductions in the specificity of a contract's language can boost autonomy, which increases intrinsic motivation and improves a range of desirable behaviors. Nine field and laboratory experiments found that less specific contracts increased task persistence, creativity, and cooperation, both immediately and longitudinally, because they boosted autonomy and intrinsic motivation. These positive effects, however, only occurred when contracts provided sufficient structure. Furthermore, the effects were limited to control-oriented clauses (i.e., legal clauses), and did not extend to coordination-oriented clauses (i.e., technical clauses). That is, there were synergistic benefits when a contract served as a scaffold that combined structure with general clauses. Overall, the current model and experiments identify a low-cost solution to the common problem of regulating social relationships: finding the right amount of contract specificity promotes desirable outcomes, including behaviors that are notoriously difficult to contract. The CAMPS model and the current set of empirical findings explain why, when, and how contracts can be used as an effective motivational tool. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  13. Report: Improved Contract Administration Needed for the Customer Technology Solutions Contract

    EPA Pesticide Factsheets

    Report #13-P-0398, September 16, 2013. Based on our review of the WCF contract EPW08034, which ended September 2012, the EPA needs to improve its contract administration to assist in managing other similar type contracts.

  14. Teaching about Contracts.

    ERIC Educational Resources Information Center

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  15. 48 CFR 1517.204 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracts. 1517.204 Section 1517.204 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 1517.204 Contracts. The SCM may approve a contract with...

  16. Pacific Northwest Laboratory annual report for 1990 to the DOE Office of Energy Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toburen, L.H.; Stults, B.R.; Mahaffey, J.A.

    Part four of the PNL Annual Report for 1990 includes research in physical sciences. Individual reports are processed separately for the data bases in the following areas: Dosimetry Research; Measurement Science; Radiological and Chemical Physics; Radiation Dosimetry; Radiation Biophysics; and Modelling Cellular Response to Genetic Damage. (FL)

  17. Laboratory for X-Ray Optics

    DTIC Science & Technology

    1993-04-29

    Kearney, "El uso de las pelfculas delgadas en la optica de rayos - x ," Proc. Symposium on the Physics of Superlattices, May 1991, in press. 6. J.M...Bolling Air Force Base ELEMENT NO. NO. NO ACCESSION NO Washin ton, D.C. 20332- //( ~ ~ C 11. TITLE (Incluft Security Claw ffation) [ TLaboratory for X ...three years under contract AFOSR-90-O 140, "Laboratory for X -Ray O.ptics. Duig thspro we concenrae our effrt in two areas: 1) grwth of epitaxial

  18. CTBTO Contractor Laboratory Test Sample Production Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bob Hague; Tracy Houghton; Nick Mann

    2013-08-01

    In October 2012 scientists from both Idaho National Laboratory (INL) and the CTBTO contact laboratory at Seibersdorf, Austria designed a system and capability test to determine if the INL could produce and deliver a short lived radio xenon standard in time for the standard to be measured at the CTBTO contact laboratory at Seibersdorf, Austria. The test included sample standard transportation duration and potential country entrance delays at customs. On October 23, 2012 scientists at the Idaho National Laboratory (INL) prepared and shipped a Seibersdorf contract laboratory supplied cylinder. The canister contained 1.0 scc of gas that consisted of 70%more » xenon and 30% nitrogen by volume. The t0 was October 24, 2012, 1200 ZULU. The xenon content was 0.70 +/ 0.01 scc at 0 degrees C. The 133mXe content was 4200 +/ 155 dpm per scc of stable xenon on t0 (1 sigma uncertainty). The 133Xe content was 19000 +/ 800 dpm per scc of stable xenon on t0 (1 sigma uncertainty).« less

  19. 48 CFR 970.1504-1-3 - Special considerations: Laboratory management and operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... appropriate for laboratories (science/technology and support) is rated at less than the target level of... established for the life of the contract. It will be established at time of award, as part of the extend...

  20. 48 CFR 970.1504-1-3 - Special considerations: Laboratory management and operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... appropriate for laboratories (science/technology and support) is rated at less than the target level of... established for the life of the contract. It will be established at time of award, as part of the extend...

  1. 48 CFR 970.1504-1-3 - Special considerations: Laboratory management and operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... appropriate for laboratories (science/technology and support) is rated at less than the target level of... established for the life of the contract. It will be established at time of award, as part of the extend...

  2. 48 CFR 970.1504-1-3 - Special considerations: Laboratory management and operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... appropriate for laboratories (science/technology and support) is rated at less than the target level of... established for the life of the contract. It will be established at time of award, as part of the extend...

  3. Pacific Northwest Laboratory annual report for 1988 to the DOE Office of Energy Research: Part 1, Biomedical Sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, J.F.

    1989-06-01

    This report summarizes progress on OHER biomedical and health-effects research conducted at PNL in FY 1988. The research develops the knowledge and scientific principles necessary to identify, understand, and anticipate the long-term health consequences of energy-related radiation and chemicals. Our continuing emphasis is to decrease the uncertainty of health-effects risk estimates from existing and/or developing energy-related technologies through an increased understanding of how radiation and chemicals cause health effects. The report is arranged to reflect PNL research relative to OHER programmatic structure. The first section, on human health effects, concerns statistical and epidemiological studies for assessing health risks. The nextmore » section, which contains reports of health-effects research in biological systems, includes research with radiation and chemicals.« less

  4. Paradoxical sphincter contraction is rarely indicative of anismus.

    PubMed

    Voderholzer, W A; Neuhaus, D A; Klauser, A G; Tzavella, K; Müller-Lissner, S A; Schindlbeck, N E

    1997-08-01

    Anismus is thought to be a cause of chronic constipation by producing outlet obstruction. The underlying mechanism is paradoxical contraction of the anal sphincter or puborectalis muscle. However, paradoxical sphincter contraction (PSC) also occurs in healthy controls, so anismus may be diagnosed too often because it may be based on a non-specific finding related to untoward conditions during the anorectal examination. To investigate the pathophysiological importance of PSC found at anorectal manometry in constipated patients and in patients with stool incontinence. Digital rectal examination and anorectal manometry were performed in 102 chronically constipated patients, 102 patients with stool incontinence, and in 18 controls without anorectal disease. In 120 of the 222 subjects defaecography was also performed. Paradoxical sphincter contraction was defined as a sustained increase in sphincter pressure during straining. Anismus was assumed when PSC was present on anorectal manometry and digital rectal examination and the anorectal angle did not widen on defaecography. Manometric PSC occurred about twice as often in constipated patients as in incontinent patients (41.2% versus 25.5%, p < 0.017) and its prevalence was similar in incontinent patients and controls (25.5% versus 22.2%). Oroanal or rectosigmoid transit times in constipated patients with and without PSC did not differ significantly (total 64.6 (8.9) hours versus 54.2 (8.1) hours; rectosigmoid 14.9 (2.4) hours versus 13.8 (2.5) hours). Paradoxical sphincter contraction is a common finding in healthy controls as well as in patients with chronic constipation and stool incontinence. Hence, PSC is primarily a laboratory artefact and true anismus is rare.

  5. 48 CFR 1517.204 - Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Contracts. 1517.204 Section 1517.204 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 1517.204 Contracts. The SCM may approve a...

  6. 48 CFR 1817.204 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracts. 1817.204 Section 1817.204 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 1817.204 Contracts. (e)(i) The 5...

  7. Contracts. Warranties.

    ERIC Educational Resources Information Center

    Mertz, Gayle

    1988-01-01

    Presents two lesson plans for grades 5-9 which are meant to increase student's legal literacy. The first lesson covers contracts and includes a comic strip which illustrates contract law. The second deals with warranties and why they are important. Included are examples of product warranties. (GEA)

  8. A laboratory study of subjective annoyance response to sonic booms and aircraft flyovers

    NASA Technical Reports Server (NTRS)

    Leatherwood, Jack D.; Sullivan, Brenda M.

    1994-01-01

    Three experiments were conducted to determine subjective equivalence of aircraft subsonic flyover noise and sonic booms. Two of the experiments were conducted in a loudspeaker-driven sonic boom simulator, and the third in a large room containing conventional loudspeakers. The sound generation system of the boom simulator had a frequency response extending to very low frequencies (about 1 Hz) whereas the large room loudspeakers were limited to about 20 Hz. Subjective equivalence between booms and flyovers was quantified in terms of the difference between the noise level of a boom and that of a flyover when the two were judged equally annoying. Noise levels were quantified in terms of the following noise descriptors: Perceived Level (PL), Perceived Noise Level (PNL), C-weighted sound exposure level (SELC), and A-weighted sound exposure level (SELA). Results from the present study were compared, where possible, to similar results obtained in other studies. Results showed that noise level differences depended upon the descriptor used, specific boom and aircraft noise events being compared and, except for the PNL descriptor, varied between the simulator and large room. Comparison of noise level differences obtained in the present study with those of other studies indicated good agreement across studies only for the PNL and SELA descriptors. Comparison of the present results with assessments of community response to high-energy impulsive sounds made by Working Group 84 of the National Research Council's Committee on Hearing, Bioacoustics, and Biomechanics (CHABA) showed good agreement when boom/flyover noise level differences were based on SELA. However, noise level differences obtained by CHABA using SELA for aircraft flyovers and SELC for booms were not in agreement with results obtained in the present study.

  9. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  10. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  11. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  12. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  13. Laboratory testing under managed care dominance in the USA

    PubMed Central

    Takemura, Y; Beck, J

    2001-01-01

    The uncontrolled escalation of total health care expenditure despite the government's endeavours during the past decades in the USA had led to the rapid infiltration of managed care organisations (MCOs). Traditional hospital based laboratories have been placed in a crucial situation with the advent of the managed care era. A massive reduction of in house testing urged them to develop strategies against financial difficulty. Consolidation and networking, participation in the outreach testing market, and emphasis on point of care/satellite laboratory testing in non-traditional, ambulatory settings are major strategies for the survival of hospital laboratories. Several physicians' office laboratories (POLS) have closed their doors in response both to regulatory restrictions imposed by the Clinical Laboratory Improvement Amendments of 1988 and to managed care infiltration. It seems likely that POLs and hospital laboratories will continue to reduce test volumes, whereas commercial reference laboratories will thrive through contracting with MCOs. In the current climate of managed care dominance in the USA, clinical laboratories are changing their basic operation focus and mission in response to the aggressively changing landscape. Key Words: laboratory testing • managed care organisations • survival strategies PMID:11215291

  14. Service quality in contracted facilities.

    PubMed

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  15. Office of Inspector General report on special audit of pension plans for Department of Energy contract employees of the University of California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-08-01

    On May 15, 1996, the Department of Energy (DOE) announced its decision to extend and renegotiate its contracts with the University of California for the management and operation of the Los Alamos, Lawrence Berkeley, and Lawrence Livermore National Laboratories. Current contracts for the operation of these laboratories expire in 1997. The renegotiation process provides an opportunity for the Department to: (1) recover at least $620 million in excess assets from the pension plans it has funded for University of California employees who work at DOE`s laboratories; and (2) improve the Department`s ability to exercise prudent management of its interest inmore » those pension funds. According to Department records, as of July 1, 1995, the University of California Retirement Plan had between $620 million and $2.0 billion in excess assets that were attributable to the Department of Energy (emphasis supplied). The wide variation in excess assets is a function of the assumptions used in making these calculations. These are described in Appendix 1 to this report. It was concluded as a result of the audit that, as part of the contract renegotiation process, the Department should obtain the cooperation and assistance of the University of California in recovering excess pension plan assets in a manner that does not affect the defined retirement benefits of the contract employees. This could include jointly sponsoring legislation to modify any existing legal restrictions.« less

  16. Mechanical Anisotropy of Rat Aortic Smooth Muscle Cells Decreases with Their Contraction

    NASA Astrophysics Data System (ADS)

    Nagayama, Kazuaki; Matsumoto, Takeo

    Tensile properties of smooth muscle cells freshly isolated from rat thoracic aortas (FSMCs) in their major and minor axes were measured using a laboratory-made micro tensile tester. The relationship between the tension applied to a cell and its elongation was obtained in untreated cells and those treated with 10-5M serotonin to induce contraction. An initial stiffness of untreated FSMCs, normalized by their initial cross-sectional area perpendicular to the stretch direction, was significantly higher in the major axis (14.8±4.3kPa, mean±SEM, n=5) than the minor axis (2.8±1.0kPa, n=5). The stiffness increased significantly in response to the contraction, but the increase was much higher in the minor axis (59.0±9.4kPa, n=4) than in the major (88.1±13.3kPa, n=4). The difference between the two directions was insignificant in the contracted state. Observations of the morphology of actin filaments with a confocal laser scanning microscope in untreated FSMCs revealed that they were long fibers running almost parallel to the major axis, while those in contracted cells showed an aggregated structure without a preferential direction. These results may indicate that anisotropy in untreated FSMCs is caused by the anisotropic alignment of their actin filaments, and that such anisotropy disappears in response to actin filament reorganization caused by the contraction.

  17. Managing Contraction.

    ERIC Educational Resources Information Center

    Taylor, William

    The major thesis of this paper on declining resources and enrollment is that the management of decline, or, as the author calls it, "contraction," is not simply an economic and technical problem; it is basically a conceptual and political one. The author first considers the effects of contraction on schools, buildings, and courses,…

  18. Employee contract issues for dermatologists.

    PubMed

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  19. Pacific Northwest Laboratory annual report for 1985 to the DOE Office of Energy Research. Part 1. Biomedical sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, J.F.

    1986-02-01

    This report summarizes progress on OHER biomedical and health-effects research conducted at PNL in FY 1985 to develop information for a comprehensive understanding of the interaction of energy-related radiation and chemicals with man. Our continuing emphasis on decreasing the uncertainty of health-effects risk estimates to man from existing and/or developing energy-related technologies supports the DOE goal of increasing and diversifying national energy resources and decreasing risks to human health. The report is arranged to reflect the PNL research relative to OHER programmatic needs. The first section concerns evaluation of possible health effects among nuclear workers. The next two sections, whichmore » contain reports of health-effects research in biological systems, include health effects of radiation and health effects of chemical mixtures. The last section is related to medical applications of nuclear technology.« less

  20. 48 CFR 235.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Defense (Acquisition, Technology, and Logistics) (USD(AT&L)) of an intent not to exercise a fixed-price... award a fixed-price type contract for a development program effort unless— (1) The level of program risk permits realistic pricing; (2) The use of a fixed-price type contract permits an equitable and sensible...

  1. A Group Counseling Contract.

    ERIC Educational Resources Information Center

    Johnson, Norbert; Johnson, Sarah Campbell

    1980-01-01

    A group counseling contract was developed following American Psychological Association ethical guidelines. The contract was effective in enabling participants to quickly become involved in group process. The contract could be modified for use by group facilitators in a variety of settings. (Author)

  2. A cost benefit analysis of outsourced laboratory services.

    PubMed

    Bowers, J A

    1995-11-01

    As healthcare moves toward increased capitation, hospital administrators must be aware of all costs associated with patient services. This article describes the cost benefit analysis process used by northern Indiana hospital consumers during 1994-1995 to evaluate a local laboratory service outsource provider, South Bend Medical Foundation (SBMF). In an effort to meet the best interests of the community at large, three competing hospitals, medical leadership, and the local outsource provider joined forces to ensure that cost effective quality services would be provided. Laboratory utilization patterns for common DRGs were also analyzed. The team created a reconfiguration analysis to help develop benchmark figures for consideration in future contract negotiations.

  3. 48 CFR 1846.470 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance 1846.470 Contract clause. The contracting officer may insert a clause substantially as stated at 1852.246-71, Government Contract Quality Assurance Functions, in solicitations and contracts to specify the location(s) of quality assurance...

  4. 48 CFR 3416.307 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clauses. 3416.307 Section 3416.307 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 3416.307 Contract...

  5. 48 CFR 716.406 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  6. 48 CFR 716.406 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  7. 48 CFR 3416.701 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clause. 3416.701 Section 3416.701 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Agreements 3416.701 Contract clause. The contracting...

  8. 48 CFR 17.204 - Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology contracts. However, statutes applicable to various classes of contracts, for example... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contracts. 17.204 Section 17.204 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND...

  9. 2000-hour cyclic endurance test of a laboratory model multipropellant resistojet

    NASA Technical Reports Server (NTRS)

    Morren, W. Earl; Sovey, James S.

    1987-01-01

    The technological readiness of a long-life multipropellant resistojet for space station auxiliary propulsion is demonstrated. A laboratory model resistojet made from grain-stabilized platinum served as a test bed to evaluate the design characteristics, fabrication methods, and operating strategies for an engineering model multipropellant resistojet developed under contract by the Rocketdyne Division of Rockwell International and Technion Incorporated. The laboratory model thruster was subjected to a 2000-hr, 2400-thermal-cycle endurance test using carbon dioxide propellant. Maximum thruster temperatures were approximately 1400 C. The post-test analyses of the laboratory model thruster included an investigation of component microstructures. Significant observations from the laboratory model thruster are discussed as they relate to the design of the engineering model thruster.

  10. Use of fine needle aspirate from peripheral nerves of pure-neural leprosy for cytology and PCR to confirm the diagnosis: a pilot study.

    PubMed

    Reja, Abu Hena Hasanoor; De, Abhishek; Biswas, Supratik; Chattopadhyay, Amitabha; Chatterjee, Gobinda; Bhattacharya, Basudev; Sarda, Aarti; Aggarwal, Ishad

    2013-01-01

    The diagnosis of pure neural leprosy (PNL) remained subjective because of over-dependence of clinical expertise and a lack of simple yet reliable diagnostic tool. The criteria for diagnosis, proposed by Jardim et al., are not routinely done by clinicians in developing country as it involves invasive nerve biopsy and sophisticated anti-PGL-1 detection. We conducted a study using fine needle aspiration cytology (FNAC) coupled with Ziehl Neelsen staining (ZN staining) and Multiplex-Polymerase Chain Reaction (PCR) specific for M. leprae for an objective diagnosis of pure neural leprosy (PNL), which may be simpler and yet reliable. The aim of the study is to couple FNAC with ZN staining and multiplex PCR to diagnose pure neural leprosy patients rapidly, in simpler and yet reliable way. Thirteen patients of PNL as diagnosed by two independent consultants were included as case, and 5 patients other than PNL were taken as control in the study. Fine needle aspiration was done on the affected nerve, and aspirates were evaluated for cytology, ZN staining and multiplex-PCR. Out of the 13 cases where fine needle aspiration was done, M. leprae could be elicited in the nerve tissue aspirates in 5 cases (38.4%) with the help of conventional acid-fast staining and 11 cases (84.6%) with the help of multiplex PCR. On cytological examination of the aspirates, only 3 (23%) cases showed specific epithelioid cells, whereas 8 (61.5%) cases showed non-specific inflammation, and 2 (15.3%) cases had no inflammatory cells. Our study demonstrates that in the field of laboratory diagnosis of PNL cases, FNAC in combination with ZN staining for acid-fast bacilli (AFB) and Multiplex-PCR can provide a rapid and definitive diagnosis for the majority of PNL cases. FNAC is a less-invasive, outdoor-based and simpler technique than invasive nerve biopsy procedure. Thus, this study may enlighten the future path for easy and reliable diagnosis of PNL.

  11. 78 FR 11685 - Public Availability of FY 2011 Service Contract Inventory Analysis, FY 2012 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Analysis, FY 2012 Service Contract Inventory, and FY 2012 Service Contract Inventory Planned Analysis for... of the availability of the FY 2011 Service Contract Inventory Analysis, the FY 2012 Service Contract Inventory, and the FY 2012 Service Contract Inventory Planned Analysis. The FY 2011 inventory analysis...

  12. 24 CFR 232.605 - Contract requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the... contract. Either form of contract shall include the cost of fire safety equipment, its installation, and...

  13. 24 CFR 232.605 - Contract requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the... contract. Either form of contract shall include the cost of fire safety equipment, its installation, and...

  14. 24 CFR 232.605 - Contract requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the... contract. Either form of contract shall include the cost of fire safety equipment, its installation, and...

  15. 48 CFR 217.204 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...)(i) Notwithstanding FAR 17.204(e), the ordering period of a task order or delivery order contract...) of this section does not apply to the following: (A) Contracts, including task or delivery order contracts, awarded under other statutory authority. (B) Advisory and assistance service task order contracts...

  16. Automatic Conflict Detection on Contracts

    NASA Astrophysics Data System (ADS)

    Fenech, Stephen; Pace, Gordon J.; Schneider, Gerardo

    Many software applications are based on collaborating, yet competing, agents or virtual organisations exchanging services. Contracts, expressing obligations, permissions and prohibitions of the different actors, can be used to protect the interests of the organisations engaged in such service exchange. However, the potentially dynamic composition of services with different contracts, and the combination of service contracts with local contracts can give rise to unexpected conflicts, exposing the need for automatic techniques for contract analysis. In this paper we look at automatic analysis techniques for contracts written in the contract language mathcal{CL}. We present a trace semantics of mathcal{CL} suitable for conflict analysis, and a decision procedure for detecting conflicts (together with its proof of soundness, completeness and termination). We also discuss its implementation and look into the applications of the contract analysis approach we present. These techniques are applied to a small case study of an airline check-in desk.

  17. Dioxins, Furans, PCBs, and Congeners Analytical Service within the Superfund Contract Laboratory Program

    EPA Pesticide Factsheets

    This page contains information about the DLM02.2 analytical service for the analysis of dioxins and furans at hazardous waste sites. The SOW contains the analytical method and contractual requirements for laboratories.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gillespie, B.M.; Stromatt, R.W.; Ross, G.A.

    This data package contains the results obtained by Pacific Northwest Laboratory (PNL) staff in the characterization of samples for the 101-SY Hydrogen Safety Project. The samples were submitted for analysis by Westinghouse Hanford Company (WHC) under the Technical Project Plan (TPP) 17667 and the Quality Assurance Plan MCS-027. They came from a core taken during Window C'' after the May 1991 gas release event. The analytical procedures required for analysis were defined in the Test Instructions (TI) prepared by the PNL 101-SY Analytical Chemistry Laboratory (ACL) Project Management Office in accordance with the TPP and the QA Plan. The requestedmore » analysis for these samples was volatile organic analysis. The quality control (QC) requirements for each sample are defined in the Test Instructions for each sample. The QC requirements outlined in the procedures and requested in the WHC statement of work were followed.« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gillespie, B.M.; Stromatt, R.W.; Ross, G.A.

    This data package contains the results obtained by Pacific Northwest Laboratory (PNL) staff in the characterization of samples for the 101-SY Hydrogen Safety Project. The samples were submitted for analysis by Westinghouse Hanford Company (WHC) under the Technical Project Plan (TPP) 17667 and the Quality Assurance Plan MCS-027. They came from a core taken during Window ``C`` after the May 1991 gas release event. The analytical procedures required for analysis were defined in the Test Instructions (TI) prepared by the PNL 101-SY Analytical Chemistry Laboratory (ACL) Project Management Office in accordance with the TPP and the QA Plan. The requestedmore » analysis for these samples was volatile organic analysis. The quality control (QC) requirements for each sample are defined in the Test Instructions for each sample. The QC requirements outlined in the procedures and requested in the WHC statement of work were followed.« less

  20. U.S. Army Aeromedical Research Laboratory Annual Progress Report FY 1986

    DTIC Science & Technology

    1986-10-01

    19 Contracts ................................................. 19 Small Business Innovation...universities and businesses which parallels the research requirements of the laboratories under the USAMRDC command. Because of the scientific manpower...Software is being written to allow double entry verification of data. 2) Small business innovation research Each year, in compliance with the Small

  1. 7 CFR 634.25 - Contracting.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.25 Contracting... agrees to apply his or her water-quality plan. Any person who controls, or shares control, of the farm... basic contract document, special provisions as needed, the participant's water-quality plan, schedule of...

  2. 7 CFR 634.25 - Contracting.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.25 Contracting... agrees to apply his or her water-quality plan. Any person who controls, or shares control, of the farm... basic contract document, special provisions as needed, the participant's water-quality plan, schedule of...

  3. 7 CFR 634.25 - Contracting.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.25 Contracting... agrees to apply his or her water-quality plan. Any person who controls, or shares control, of the farm... basic contract document, special provisions as needed, the participant's water-quality plan, schedule of...

  4. The Joy of Contracts.

    ERIC Educational Resources Information Center

    Hegarty, Kevin

    This paper is a practical guide that explains and illustrates contracts between libraries and vendors for computerized circulation systems. It describes the elements of a typical contract to include the equipment and services that should be specified in the contract and establishes scheduling and acceptance testing needs. Included in a contract…

  5. A comparative study of job satisfaction among regular and staff on contract in the primary health care system in Delhi, India

    PubMed Central

    Kumar, Pawan; Khan, Abdul M.; Inder, Deep; Mehra, Anu

    2014-01-01

    Background: Job satisfaction is a pleasant emotional state associated with the appreciation of one's work and contributes immensely to performance in an organization. The purpose of this study was to assess the comparative job satisfaction among regular and staff on contract in Government Primary Urban Health Centers in Delhi, India. Materials and Methods: The study was conducted in 2013, on a sample of 333 health care providers who were selected using a multistage random sampling technique. The sample included medical officers (MOs), auxiliary nurses and midwives (ANMs), pharmacists and laboratory technicians (LTs)/laboratory assistants (LAs) among regular and staff on contract. Analysis was done using SPSS version 18, and appropriate statistical tests were applied. Results: The job satisfaction for all the regular staff that is, MOs, ANMs, pharmacists, LAs, and LTs were relatively higher (3.3 ± 0.44) than the contract staff (2.7 ± 0.45) with ‘t’value 10.54 (P < 0.01). The mean score for regular and contract MOs was 3.2 ± 0.46 and 2.7 ± 0.56, respectively, and the same trends were found between regular and ANMs on the contract which was 3.4 ± 0.30 and 2.7 ± 0.38, regular and pharmacists on the contract was 3.3 ± 0.50 and 2.8 ± 0.41, respectively. The differences between groups were significant with a P < 0.01. Conclusion: Overall job satisfaction level was relatively low in both regular and contract staff. The factors contributing to satisfaction level were privileges, interpersonal relations, working-environment, patient relationship, the organization's facilities, career development, and the scarcity of human resources (HRs). Therefore, specific recommendations are suggested to policy makers to take cognizance of the scarcity of HRs and the on-going experimentation with different models under primary health care system. PMID:24987280

  6. Compressed Natural Gas and Liquefied Petroleum Gas Conversions: The National Renewable Energy Laboratory's Experience

    DOT National Transportation Integrated Search

    1996-04-01

    The National Renewable Energy Laboratory (NREL) contracted with conversion : companies in six states to convert approximately 900 light-duty Federal fleet : vehicles to operate on compressed natural gas (CNG) or liquefied petroleum gas : (LPG). After...

  7. Regional Educational Laboratory Approaches to Educational Improvement: A Descriptive Synthesis.

    ERIC Educational Resources Information Center

    Mason, Ward S.

    This study describes the nine regional educational laboratories supported by the Office of Educational Research and Improvement (OERI). The labs are operating under 5-year contracts for 1986-1990. The study analyzed lab-produced documents, describing lab operation for the first 2 years of this period, highlighting the status of the program at the…

  8. INTER LABORATORY COMBAT HELMET BLUNT IMPACT TEST METHOD COMPARISON

    DTIC Science & Technology

    2018-03-26

    HELMET BLUNT IMPACT TEST METHOD COMPARISON by Tony J. Kayhart Charles A. Hewitt and Jonathan Cyganik March 2018 Final...Report March 2016 – August 2017 Approved for public release; distribution is unlimited U.S. Army Natick Soldier Research ...INTER-LABORATORY COMBAT HELMET BLUNT IMPACT TEST METHOD COMPARISON 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR

  9. 48 CFR 632.705 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clauses. 632.705 Section 632.705 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 632.705 Contract clauses. ...

  10. 48 CFR 32.705 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clauses. 32.705 Section 32.705 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 32.705 Contract clauses. ...

  11. Defense Contract Management Agency

    Science.gov Websites

    , May 24. Click the photo above for more information. Members of the Defense Contract Management Agency for more information. Members of the Defense Contract Management Agency International Region conduct Skip to main content (Press Enter). Toggle navigation Defense Contract Management Agency Search

  12. An Analysis of Air Force Service Contract Cases Appealed to the Armed Services Board of Contract Appeals

    DTIC Science & Technology

    1988-09-01

    DEM/88S- 1 AN ANALYSIS OF AIR FORCE SERVICE CONTRACT CASES APPEALED TO THE ARMED SERVICES BOARD OF CONTRACT APPEALS THESIS Diane L. Bowden First...CONTRACT CASES APPEALED TO THE ARMED SERVICES BOARD OF CONTRACT APPEALS THESIS Presented to the Faculty of the School of Systems and Logistics of the Air...analyze, and condense information that might be useful to contracting and contract management personnel. Armed Services Board of Contract Appeals

  13. 48 CFR 42.401 - Contract correspondence.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract correspondence... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Correspondence and Visits 42.401 Contract correspondence. (a) The contracting officer (or other contracting agency personnel) normally shall (1) forward...

  14. 48 CFR 1832.705 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clauses. 1832.705 Section 1832.705 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 1832.705 Contract clauses. ...

  15. 48 CFR 1242.7000 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1242.7000 Section 1242.7000 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Clauses 1242.7000 Contract...

  16. Geomorphologic Modeling of a Macro-Tidal Embayment With Extensive Tidal Flats: Skagit Bay, WA

    DTIC Science & Technology

    2009-01-01

    Tidal Flats: Skagit Bay , WA Lyle Hibler Pacific Northwest National Laboratory 1529 West Sequim Bay Road Sequim , WA 98382 phone: (360) 681...3616 fax: (360) 681-3681 email: lyle.hibler@pnl.gov Adam Maxwell Pacific Northwest National Laboratory 1529 West Sequim Bay Road Sequim , WA... Sequim Bay Road, Sequim ,WA,98382 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR

  17. Geomorphologic Modeling of a Macro-tidal Embayment with Extensive Tidal Flats: Skagit Bay, WA

    DTIC Science & Technology

    2008-01-01

    Bay , WA Lyle Hibler Pacific Northwest National Laboratory 1529 West Sequim Bay Road Sequim , WA 98382 phone: (360) 681-3616 fax: (360)681-3681...email: lyle.hibler@pnl.gov Adam Maxwell Pacific Northwest National Laboratory 1529 West Sequim Bay Road Sequim , WA 98382 phone: (360) 681... Sequim Bay Road, Sequim ,WA,98382 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10.

  18. 48 CFR 846.312 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction contracts. 846.312 Section 846.312 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 846.312 Construction contracts. The contracting officer shall...

  19. 48 CFR 543.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 543.205 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 543.205 Contract clauses. The contracting officer shall insert 552.243-71, Equitable Adjustments, in solicitations and contracts containing FAR 52.243-4, Changes. [74 FR...

  20. 7 CFR 1780.61 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Construction contracts. 1780.61 Section 1780.61..., Constructing and Inspections § 1780.61 Construction contracts. Contract documents must be sufficiently.... (a) Standard construction contract documents. If the construction contract documents utilized are not...

  1. 7 CFR 1780.61 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Construction contracts. 1780.61 Section 1780.61..., Constructing and Inspections § 1780.61 Construction contracts. Contract documents must be sufficiently.... (a) Standard construction contract documents. If the construction contract documents utilized are not...

  2. 48 CFR 3443.106 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clause. 3443.106 Section 3443.106 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS 3443.106 Contract clause. The contracting officer shall insert...

  3. 48 CFR 543.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 543.205 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 543.205 Contract clauses. The contracting officer shall insert 552.243-71, Equitable Adjustments, in solicitations and contracts containing FAR 52.243-4, Changes. [74 FR...

  4. A woman like you: Women scientists and engineers at Brookhaven National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benkovitz, Carmen; Bernholc, Nicole; Cohen, Anita

    1991-01-01

    This publication by the women in Science and Engineering introduces career possibilities in science and engineering. It introduces what work and home life are like for women who have already entered these fields. Women at Brookhaven National Laboratory work in a variety of challenging research roles -- from biologist and environmental scientist to safety engineer, from patent lawyer to technician. Brookhaven National Laboratory is a multi-program laboratory which carries out basic and applied research in the physical, biomedical and environmental sciences and in selected energy technologies. The Laboratory is managed by Associated University, Inc., under contract with the US Departmentmore » of Energy. Brookhaven and the other national laboratories, because of their enormous research resources, can play a critical role in a education and training of the workforce.« less

  5. Caveats on Contract.

    ERIC Educational Resources Information Center

    Croxton, Tom A.

    1988-01-01

    Addresses concept of the therapeutic contract in clinical social work and psychotherapy. Defines "contract," describing legal implications, and implications for the professional relationship and course of treatment. Discusses mutuality, penalty clauses, voluntary participation in contractual process, malpractice and professional negligence,…

  6. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  7. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  8. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  9. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  10. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  11. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  12. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  13. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  14. 48 CFR 46.314 - Transportation contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  15. 48 CFR 46.314 - Transportation contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  16. 48 CFR 46.314 - Transportation contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  17. 48 CFR 46.314 - Transportation contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  18. 48 CFR 46.314 - Transportation contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  19. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 2035.70 Contract clauses. (a) The contracting officer shall insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  20. Affine Contractions on the Plane

    ERIC Educational Resources Information Center

    Celik, D.; Ozdemir, Y.; Ureyen, M.

    2007-01-01

    Contractions play a considerable role in the theory of fractals. However, it is not easy to find contractions which are not similitudes. In this study, it is shown by counter examples that an affine transformation of the plane carrying a given triangle onto another triangle may not be a contraction even if it contracts edges, heights or medians.…

  1. Army Contract Writing System (ACWS)

    DTIC Science & Technology

    2016-03-01

    2016 Major Automated Information System Annual Report Army Contract Writing System (ACWS) Defense Acquisition Management Information Retrieval...Program Information Program Name Army Contract Writing System (ACWS) DoD Component Army Responsible Office Program Manager References MAIS...UNCLASSIFIED 4 Program Description The Army Contract Writing System (ACWS) will be the Army’s single, next-generation, enterprise-wide contract writing

  2. Uterine Contraction Modeling and Simulation

    NASA Technical Reports Server (NTRS)

    Liu, Miao; Belfore, Lee A.; Shen, Yuzhong; Scerbo, Mark W.

    2010-01-01

    Building a training system for medical personnel to properly interpret fetal heart rate tracing requires developing accurate models that can relate various signal patterns to certain pathologies. In addition to modeling the fetal heart rate signal itself, the change of uterine pressure that bears strong relation to fetal heart rate and provides indications of maternal and fetal status should also be considered. In this work, we have developed a group of parametric models to simulate uterine contractions during labor and delivery. Through analysis of real patient records, we propose to model uterine contraction signals by three major components: regular contractions, impulsive noise caused by fetal movements, and low amplitude noise invoked by maternal breathing and measuring apparatus. The regular contractions are modeled by an asymmetric generalized Gaussian function and least squares estimation is used to compute the parameter values of the asymmetric generalized Gaussian function based on uterine contractions of real patients. Regular contractions are detected based on thresholding and derivative analysis of uterine contractions. Impulsive noise caused by fetal movements and low amplitude noise by maternal breathing and measuring apparatus are modeled by rational polynomial functions and Perlin noise, respectively. Experiment results show the synthesized uterine contractions can mimic the real uterine contractions realistically, demonstrating the effectiveness of the proposed algorithm.

  3. Contract Design, Supply Chain Complexity, and Accountability in Federal Contracts

    DTIC Science & Technology

    2016-04-30

    understanding how organizations, policy makers, and citizens use information to make decisions and influence public and organizational policy. He has...qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = Contract Design, Supply Chain Complexity, and Accountability in Federal...Executive Officer, PEO IEW&S Contract Design, Supply Chain Complexity, and Accountability in Federal Contracts Adam Eckerd, Assistant Professor

  4. GREEN RIVER AIR QUALITY MODEL DEVELOPMENT: METEOROGICAL AND TRACER DATA-FIELD STUDY IN BRUSH VALLEY, COLORADO, JULY-AUGUST, 1982

    EPA Science Inventory

    Special meteorological and atmospheric tracer studies were conducted during a three-week period in July and August of 1982 in the Brush Creek Valley of northwestern Colorado. The experiments were conducted by the U.S. Department of Energy's Pacific Northwest Laboratory (PNL) as p...

  5. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  6. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  7. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  8. 48 CFR 37.304 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clauses. 37.304... CONTRACTING SERVICE CONTRACTING Dismantling, Demolition, or Removal of Improvements 37.304 Contract clauses. (a) The contracting officer shall insert the clause at 52.237-4, Payment by Government to Contractor...

  9. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  10. 24 CFR 232.605 - Contract requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the... contract. Either form of contract shall include the cost of fire safety equipment, its installation, and...

  11. 48 CFR 52.222-48 - Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment....222-48 Exemption from Application of the Service Contract Act to Contracts for Maintenance... following provision: Exemption From Application of the Service Contract Act to Contracts for Maintenance...

  12. 48 CFR 52.222-51 - Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment....222-51 Exemption from Application of the Service Contract Act to Contracts for Maintenance... clause: Exemption From Application of the Service Contract Act to Contracts for Maintenance, Calibration...

  13. The Pitfalls of Companion Diagnostics: Evaluation of Discordant EGFR Mutation Results from a Clinical Laboratory and a Central Laboratory.

    PubMed

    Turner, Scott A; Peterson, Jason D; Pettus, Jason R; de Abreu, Francine B; Amos, Christopher I; Dragnev, Konstantin H; Tsongalis, Gregory J

    2016-05-01

    Accurate identification of somatic mutations in formalin-fixed, paraffin-embedded tumor tissue is required for enrollment into clinical trials for many novel targeted therapeutics, including trials requiring EGFR mutation status in non-small-cell lung carcinomas. Central clinical trial laboratories contracted to perform this analysis typically rely on US Food and Drug Administration-approved targeted assays to identify these mutations. We present two cases in which central laboratories inaccurately reported EGFR mutation status because of improper identification and isolation of tumor material and failure to accurately report assay limitations, resulting in enrollment denial. Such cases highlight the need for increased awareness by clinical trials of the limitation of these US Food and Drug Administration-approved assays and the necessity for a mechanism to reevaluate discordant results by alternative laboratory-developed procedures, including clinical next-generation sequencing. Copyright © 2016 American Society for Investigative Pathology and the Association for Molecular Pathology. Published by Elsevier Inc. All rights reserved.

  14. 24 CFR 891.560 - HAP contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  15. Synthesis of innovative contracting strategies for routine and preventive maintenance contracts.

    DOT National Transportation Integrated Search

    2010-02-01

    TxDOT is faced with a need to expand their maintenance contracted services due to shortage of in-house : personnel and expertise. As a result, TxDOT had a need to investigate maintenance contracting strategies to : identify those efficient strategies...

  16. A Laboratory Study Investigating the Feasibility of Applying Calcite-Type Coatings to Segregated Ballast Tanks

    DTIC Science & Technology

    1981-08-01

    A LABORATORY STUDY INVESTIGATIING THE FEASIBILITY OF APPLYING CALCITE -TYPE COATINGS TO SEGREGATED BALLAST TANKS AUGUST, 1981 Prepared by: Ocean City...Laboratory Study Investigating The Feasibility of Applying Calcite -Type Coatings to Segregated Ballast Tanks 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...Executive Summary List of Figures I. Conclusions II. Introduction III. Background-The Development and Use of Calcite -Type Coatings IV. Experimental

  17. 48 CFR 52.222-52 - Exemption from Application of the Service Contract Act to Contracts for Certain Services...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the Service Contract Act to Contracts for Certain Services-Certification. 52.222-52 Section 52.222... from Application of the Service Contract Act to Contracts for Certain Services—Certification. As... Contract Act to Contracts for Certain Services—Certification (NOV 2007) (a) The offeror shall check the...

  18. A 2000-hour cyclic endurance test of a laboratory model multipropellant resistojet

    NASA Technical Reports Server (NTRS)

    Morren, W. Earl; Sovey, James S.

    1987-01-01

    The technological readiness of a long-life multipropellant resistojet for space station auxiliary propulsion is demonstrated. A laboratory model resistojet made from grain-stabilized platinum served as a test bed to evaluate the design characteristics, fabrication methods, and operating strategies for an engineering model multipropellant resistojet developed under contract by the Rocketdyne Division of Rockwell International and Technion Incorporated. The laboratory model thruster was subjected to a 2000-hr, 2400-thermal-cycle endurance test using carbon dioxide propellant. Maximum thruster temperatures were approximately 1400 C. The post-test analyses of the laboratory model thruster included an investigation of component microstructures. Significant observations from the laboratory model thruster are discussed as they relate to the design of the engineering model thruster.

  19. 48 CFR 16.203-4 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 16.203-4 Contract clauses. (a) Adjustment... must agree in writing on the identity of the standard supplies and the corresponding contract line...) The contracting officer shall describe in detail in the contract Schedule— (i) The types of labor and...

  20. The Value of Competitive Contracting

    DTIC Science & Technology

    2014-09-01

    Research & Engineering) BBP Better Buying Power BOA basic ordering agreement BPA basic purchase agreement CAE Component Acquisition Executive CDSA...competitive procedures for the following contract actions:” a. Contract and purchase orders b. Orders and calls under part 13 Basic Purchase Agreement ( BPA ...Basic Ordering Agreement (BOA) c. Government wide acquisition contracts and IDIQ contracts d. BPAs and BPA calls under Federal Supply Schedules

  1. 29 CFR 4.107 - Federal contracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Federal contracts. 4.107 Section 4.107 Labor Office of the Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Agencies Whose Contracts May Be Covered § 4.107 Federal contracts. (a) Section 2(a) of the Act...

  2. Model of rotary-actuated flexible beam with notch filter vibration suppression controller and torque feedforward load compensation controller

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bills, K.C.; Kress, R.L.; Kwon, D.S.

    1994-12-31

    This paper describes ORNL`s development of an environment for the simulation of robotic manipulators. Simulation includes the modeling of kinematics, dynamics, sensors, actuators, control systems, operators, and environments. Models will be used for manipulator design, proposal evaluation, control system design and analysis, graphical preview of proposed motions, safety system development, and training. Of particular interest is the development of models for robotic manipulators having at least one flexible link. As a first application, models have been developed for the Pacific Northwest Laboratory`s Flexible Beam Test Bed (PNL FBTB), which is a 1-Degree-of-Freedom, flexible arm with a hydraulic base actuator. ORNLmore » transferred control algorithms developed for the PNL FBTB to controlling IGRIP models. A robust notch filter is running in IGRIP controlling a full dynamics model of the PNL test bed. Model results provide a reasonable match to the experimental results (quantitative results are being determined) and can run on ORNL`s Onyx machine in approximately realtime. The flexible beam is modeled as six rigid sections with torsional springs between each segment. The spring constants were adjusted to match the physical response of the flexible beam model to the experimental results. The controller is able to improve performance on the model similar to the improvement seen on the experimental system. Some differences are apparent, most notably because the IGRIP model presently uses a different trajectory planner than the one used by ORNL on the PNL test bed. In the future, the trajectory planner will be modified so that the experiments and models are the same. The successful completion of this work provides the ability to link C code with IGRIP, thus allowing controllers to be developed, tested, and tuned in simulation and then ported directly to hardware systems using the C language.« less

  3. Concrete material characterization reinforced concrete tank structure Multi-Function Waste Tank Facility

    NASA Astrophysics Data System (ADS)

    Winkel, B. V.

    1995-03-01

    The purpose of this report is to document the Multi-Function Waste Tank Facility (MWTF) Project position on the concrete mechanical properties needed to perform design/analysis calculations for the MWTF secondary concrete structure. This report provides a position on MWTF concrete properties for the Title 1 and Title 2 calculations. The scope of the report is limited to mechanical properties and does not include the thermophysical properties of concrete needed to perform heat transfer calculations. In the 1970's, a comprehensive series of tests were performed at Construction Technology Laboratories (CTL) on two different Hanford concrete mix designs. Statistical correlations of the CTL data were later generated by Pacific Northwest Laboratories (PNL). These test results and property correlations have been utilized in various design/analysis efforts of Hanford waste tanks. However, due to changes in the concrete design mix and the lower range of MWTF operating temperatures, plus uncertainties in the CTL data and PNL correlations, it was prudent to evaluate the CTL data base and PNL correlations, relative to the MWTF application, and develop a defendable position. The CTL test program for Hanford concrete involved two different mix designs: a 3 kip/sq in mix and a 4.5 kip/sq in mix. The proposed 28-day design strength for the MWTF tanks is 5 kip/sq in. In addition to this design strength difference, there are also differences between the CTL and MWTF mix design details. Also of interest, are the appropriate application of the MWTF concrete properties in performing calculations demonstrating ACI Code compliance. Mix design details and ACI Code issues are addressed in Sections 3.0 and 5.0, respectively. The CTL test program and PNL data correlations focused on a temperature range of 250 to 450 F. The temperature range of interest for the MWTF tank concrete application is 70 to 200 F.

  4. Contract Financing for Small Business

    DTIC Science & Technology

    1981-11-01

    problem. Small business contractors devote considerable management attention to operating capital and cash flow. Small business contractors are keenly...CONTRACT FINANCING 0FOR SMALL BUSINESS November 1981 -s Paul R. McClenon Prepared pursuant to Department of Defense Contract No. MDA903-81-C-0166...34 i 12 17046 DistIbufios Unlimted !I CONTRACT FINANCING FOR SMALL BUSINESS EXECUTIVE SUMMHARY To perform effectively on a contract, a firm needs

  5. Laboratory and Space Plasma Studies

    NASA Astrophysics Data System (ADS)

    Hyman, Ellis

    1996-08-01

    The work performed by Science Applications International Corporation (SAIC), encompasses a wide range of topics in experimental, computational, and analytical laboratory and space plasma physics. The accomplishments described in this report have been in support of the programs of the Laser Plasma Branch (Code 6730) and other segments of the Plasma Physics Division at the Naval Research Laboratory (NRL) and cover the period 27 September 1993 to August 1, 1996. SAIC's efforts have been supported by sub-contracts or consulting agreements with Pulse Sciences, Inc., Clark Richardson, and Biskup Consulting Engineers, Pharos Technical Enterprises, Plex Corporation, Cornell University, Stevens Institute of Technology, the University of Connecticut, Plasma Materials and Technologies, Inc., and GaSonics International, Inc. In the following discussions section we will describe each of the topics investigated and the results obtained. Much of the research work has resulted in journal publications and NRL Memorandum Reports in which the investigation is described in detail. These reports are included as Appendices to this Final Report.

  6. 7 CFR 631.10 - Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for the life of the proposed contract. (b) Contracts may be entered into not later than September 30... the conservation plan and must extend at least 3 years but not more than 10 years. (c) Contracts may...

  7. 7 CFR 631.10 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for the life of the proposed contract. (b) Contracts may be entered into not later than September 30... the conservation plan and must extend at least 3 years but not more than 10 years. (c) Contracts may...

  8. Contracting for Change

    ERIC Educational Resources Information Center

    Scholtes, Peter R.

    1975-01-01

    An organizational workshop for staff members focused on organizational change through identification of problems, one-to-one communication, and the writing of contracts for behavioral change. Contract forming assists members to agree on definition of problems, to involve and commit themselves, and to define processes for change. (EA)

  9. Whither Performance Contracting?

    ERIC Educational Resources Information Center

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  10. Landscape predictors of pathogen prevalence and range contractions in US bumblebees.

    PubMed

    McArt, Scott H; Urbanowicz, Christine; McCoshum, Shaun; Irwin, Rebecca E; Adler, Lynn S

    2017-11-29

    Several species of bumblebees have recently experienced range contractions and possible extinctions. While threats to bees are numerous, few analyses have attempted to understand the relative importance of multiple stressors. Such analyses are critical for prioritizing conservation strategies. Here, we describe a landscape analysis of factors predicted to cause bumblebee declines in the USA. We quantified 24 habitat, land-use and pesticide usage variables across 284 sampling locations, assessing which variables predicted pathogen prevalence and range contractions via machine learning model selection techniques. We found that greater usage of the fungicide chlorothalonil was the best predictor of pathogen ( Nosema bombi ) prevalence in four declining species of bumblebees. Nosema bombi has previously been found in greater prevalence in some declining US bumblebee species compared to stable species. Greater usage of total fungicides was the strongest predictor of range contractions in declining species, with bumblebees in the northern USA experiencing greater likelihood of loss from previously occupied areas. These results extend several recent laboratory and semi-field studies that have found surprising links between fungicide exposure and bee health. Specifically, our data suggest landscape-scale connections between fungicide usage, pathogen prevalence and declines of threatened and endangered bumblebees. © 2017 The Author(s).

  11. 17 CFR Appendix B to Part 43 - Enumerated Physical Commodity Contracts and Other Contracts

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 1 2012-04-01 2012-04-01 false Enumerated Physical Commodity... TRADING COMMISSION REAL-TIME PUBLIC REPORTING Pt. 43, App. B Appendix B to Part 43—Enumerated Physical Commodity Contracts and Other Contracts Enumerated Physical Commodity Contracts Agriculture ICE Futures U.S...

  12. 48 CFR 1235.7000 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING Research Misconduct 1235.7000 Contract clause. The contracting officer shall insert the clause at (TAR) 48 CFR 1252.235-70, Research Misconduct, in... Policy on Research Misconduct,” dated February 2002. ...

  13. 48 CFR 1235.7000 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING Research Misconduct 1235.7000 Contract clause. The contracting officer shall insert the clause at (TAR) 48 CFR 1252.235-70, Research Misconduct, in... Policy on Research Misconduct,” dated February 2002. ...

  14. 48 CFR 1235.7000 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING Research Misconduct 1235.7000 Contract clause. The contracting officer shall insert the clause at (TAR) 48 CFR 1252.235-70, Research Misconduct, in... Policy on Research Misconduct,” dated February 2002. ...

  15. 48 CFR 1235.7000 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING Research Misconduct 1235.7000 Contract clause. The contracting officer shall insert the clause at (TAR) 48 CFR 1252.235-70, Research Misconduct, in... Policy on Research Misconduct,” dated February 2002. ...

  16. Evaluation of the Regional Educational Laboratories. Interim Report. NCEE 2013-4014

    ERIC Educational Resources Information Center

    Carlson, Elaine; Scott, Jenna; Zhang, Xiaodong; Gutmann, Babette; Sinclair, Beth

    2013-01-01

    The Regional Educational Laboratories (RELs) are a networked system of 10 organizations that serve the educational needs of 10 designated regions across the United States and its territories. The U.S. Department of Education (ED) is authorized by the Education Sciences Reform Act (ESRA) to award contracts to 10 RELs to support applied research,…

  17. 48 CFR 32.114 - Unusual contract financing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.114 Unusual contract financing. Any contract financing arrangement that deviates from this part is unusual contract financing...

  18. The PIAA Coronagraph Prototype: First Laboratory Results.

    NASA Astrophysics Data System (ADS)

    Pluzhnik, Eugene; Guyon, O.; Colley, S.; Gallet, B.; Ridgway, S.; Woodruff, R.; Tanaka, S.; Warren, M.

    2006-12-01

    The phase-induced amplitude apodization (PIAA) coronagraph combines the main advantages of classical pupil apodization with high throughput ( 100%), high angular resolution ( 2λ/D) and low chromaticity. These advantages can allow direct imaging of nearby extrasolar planets with a 4-meter telescope. The PIAA coronagraph laboratory prototype has been successfully manufactured and starts to operate at the Subary Telescope facility. We present here our first laboratory results with this prototype where we have achieved 2x10-6 contrast within 2 λ/D. We also discuss the main constrains limiting the contrast and describe our future efforts. This work was carried out under JPL contract numbers 1254445 and 1257767 for Development of Technologies for the Terrestrial Planet Finder Mission, with the support and hospitality of the National Astronomical Observatory of Japan.

  19. Lessons learned from new construction utility demand side management programs and their implications for implementing building energy codes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wise, B.K.; Hughes, K.R.; Danko, S.L.

    1994-07-01

    This report was prepared for the US Department of Energy (DOE) Office of Codes and Standards by the Pacific Northwest Laboratory (PNL) through its Building Energy Standards Program (BESP). The purpose of this task was to identify demand-side management (DSM) strategies for new construction that utilities have adopted or developed to promote energy-efficient design and construction. PNL conducted a survey of utilities and used the information gathered to extrapolate lessons learned and to identify evolving trends in utility new-construction DSM programs. The ultimate goal of the task is to identify opportunities where states might work collaboratively with utilities to promotemore » the adoption, implementation, and enforcement of energy-efficient building energy codes.« less

  20. FERRET-SAND II physics-dosimetry analysis for N Reactor Pressure Tubes 2954, 3053 and 1165 using a WIMS calculated input spectrum

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McElroy, W.N.; Kellogg, L.S.; Matsumoto, W.Y.

    1988-05-01

    This report is in response to a request from Westinghouse Hanford Company (WHC) that the PNL National Dosimetry Center (NDC) perform physics-dosimetry analyses (E > MeV) for N Reactor Pressure Tubes 2954 and 3053. As a result of these analyses, and recommendations for additional studies, two physics-dosimetry re-evaluations for Pressure Tube 1165 were also accomplished. The primary objective of Pacific Northwest Laboratories' (PNL) National Dosimetry Center (NDC) physics-dosimetry work for N Reactor was to provide FERRET-SAND II physics-dosimetry results to assist in the assessment of neutron radiation-induced changes in the physical and mechanical properties of N Reactor pressure tubes. 15more » refs., 6 figs., 5 tabs.« less

  1. MUSCLEMOTION: A Versatile Open Software Tool to Quantify Cardiomyocyte and Cardiac Muscle Contraction In Vitro and In Vivo.

    PubMed

    Sala, Luca; van Meer, Berend J; Tertoolen, Leon G J; Bakkers, Jeroen; Bellin, Milena; Davis, Richard P; Denning, Chris; Dieben, Michel A E; Eschenhagen, Thomas; Giacomelli, Elisa; Grandela, Catarina; Hansen, Arne; Holman, Eduard R; Jongbloed, Monique R M; Kamel, Sarah M; Koopman, Charlotte D; Lachaud, Quentin; Mannhardt, Ingra; Mol, Mervyn P H; Mosqueira, Diogo; Orlova, Valeria V; Passier, Robert; Ribeiro, Marcelo C; Saleem, Umber; Smith, Godfrey L; Burton, Francis L; Mummery, Christine L

    2018-02-02

    There are several methods to measure cardiomyocyte and muscle contraction, but these require customized hardware, expensive apparatus, and advanced informatics or can only be used in single experimental models. Consequently, data and techniques have been difficult to reproduce across models and laboratories, analysis is time consuming, and only specialist researchers can quantify data. Here, we describe and validate an automated, open-source software tool (MUSCLEMOTION) adaptable for use with standard laboratory and clinical imaging equipment that enables quantitative analysis of normal cardiac contraction, disease phenotypes, and pharmacological responses. MUSCLEMOTION allowed rapid and easy measurement of movement from high-speed movies in (1) 1-dimensional in vitro models, such as isolated adult and human pluripotent stem cell-derived cardiomyocytes; (2) 2-dimensional in vitro models, such as beating cardiomyocyte monolayers or small clusters of human pluripotent stem cell-derived cardiomyocytes; (3) 3-dimensional multicellular in vitro or in vivo contractile tissues, such as cardiac "organoids," engineered heart tissues, and zebrafish and human hearts. MUSCLEMOTION was effective under different recording conditions (bright-field microscopy with simultaneous patch-clamp recording, phase contrast microscopy, and traction force microscopy). Outcomes were virtually identical to the current gold standards for contraction measurement, such as optical flow, post deflection, edge-detection systems, or manual analyses. Finally, we used the algorithm to quantify contraction in in vitro and in vivo arrhythmia models and to measure pharmacological responses. Using a single open-source method for processing video recordings, we obtained reliable pharmacological data and measures of cardiac disease phenotype in experimental cell, animal, and human models. © 2017 The Authors.

  2. 48 CFR 342.7102 - Contract modifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Contract modifications. 342.7102 Section 342.7102 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Administrative Actions for Cost Overruns 342.7102 Contract modifications...

  3. 48 CFR 1632.617 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clause. 1632.617 Section 1632.617 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Debts...

  4. 48 CFR 1632.617 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contract clause. 1632.617 Section 1632.617 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Debts...

  5. 48 CFR 342.7101 - Contract administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Contract administration. 342.7101 Section 342.7101 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Administrative Actions for Cost Overruns 342.7101 Contract administration. ...

  6. 48 CFR 1632.772 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contract clause. 1632.772 Section 1632.772 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract...

  7. 48 CFR 1632.617 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Contract clause. 1632.617 Section 1632.617 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Debts...

  8. 48 CFR 1235.7000 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... all solicitations and contracts for research and development. For further information, see DOT's Implementation Guidance for Executive Office of the President, Office of Science and Technology Policy, “Federal... OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING Research Misconduct 1235.7000 Contract clause...

  9. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Construction contracts. 546.312 Section 546.312 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at...

  10. 48 CFR 243.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract clauses. 243.205 Section 243.205 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.205 Contract clauses. ...

  11. 48 CFR 342.7101 - Contract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contract administration. 342.7101 Section 342.7101 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Administrative Actions for Cost Overruns 342.7101 Contract administration. ...

  12. 48 CFR 342.7102 - Contract modifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contract modifications. 342.7102 Section 342.7102 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Administrative Actions for Cost Overruns 342.7102 Contract modifications...

  13. 48 CFR 542.1107 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clause. 542.1107 Section 542.1107 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Production Surveillance and Reporting 542.1107 Contract...

  14. 48 CFR 243.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contract clauses. 243.205 Section 243.205 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.205 Contract clauses. ...

  15. 48 CFR 1509.507-2 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) solicitations and contracts, except Site Specific solicitations and contracts. The term “RAC” in the Limitation of Future Contracting clauses includes not only RAC solicitations and contracts but other long term..., except site specific solicitations and contracts. The term “ERRS” in the Limitation of Future Contracting...

  16. 48 CFR 1509.507-2 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) solicitations and contracts, except Site Specific solicitations and contracts. The term “RAC” in the Limitation of Future Contracting clauses includes not only RAC solicitations and contracts but other long term..., except site specific solicitations and contracts. The term “ERRS” in the Limitation of Future Contracting...

  17. 48 CFR 1509.507-2 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) solicitations and contracts, except Site Specific solicitations and contracts. The term “RAC” in the Limitation of Future Contracting clauses includes not only RAC solicitations and contracts but other long term..., except site specific solicitations and contracts. The term “ERRS” in the Limitation of Future Contracting...

  18. 48 CFR 1509.507-2 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) solicitations and contracts, except Site Specific solicitations and contracts. The term “RAC” in the Limitation of Future Contracting clauses includes not only RAC solicitations and contracts but other long term..., except site specific solicitations and contracts. The term “ERRS” in the Limitation of Future Contracting...

  19. 48 CFR 232.501-3 - Contract price.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract price. 232.501-3... 232.501-3 Contract price. (b) The contracting officer may approve progress payments when the contract price exceeds the funds obligated under the contract, provided the contract limits the Government's...

  20. 7 CFR 4288.121 - Contract.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE PAYMENT PROGRAMS Advanced Biofuel Payment Program General Provisions Enrollment Provisions § 4288.121 Contract. Advanced biofuel producers determined to be eligible to.... (a) Contract. The Agency will forward the contract to the advanced biofuel producer. The advanced...

  1. Reasons for Letter Contracts.

    DTIC Science & Technology

    1980-09-01

    accelerated Initial Operational Capability (IOC). The TOW-DRAGON PM reacted accordingly. This also is a good example of a letter contract award to permit...Government. Good pricing depends pri- marily upon the exercise of sound judgement by all personnel concerned with the procurement. I: 3-801.2...Contracts. (a) The written determination required by DAR 3-408(c)(1) shall in- clude an outline of the reaons for a letter contract and the alternatives

  2. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial...

  3. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial...

  4. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial...

  5. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial...

  6. 48 CFR 747.507 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  7. 48 CFR 1443.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1443.205 Section 1443.205 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1443.205 Contract clauses. BPCs may establish procedures, when...

  8. 48 CFR 970.1504 - Contract pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  9. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information... information technology services or support services. [61 FR 41470, Aug. 8, 1996. Redesignated at 62 FR 274...

  10. 48 CFR 204.802 - Contract files.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contract files. 204.802 Section 204.802 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.802 Contract files. Official contract...

  11. 48 CFR 204.802 - Contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contract files. 204.802 Section 204.802 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.802 Contract files. Official contract...

  12. 48 CFR 204.802 - Contract files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract files. 204.802 Section 204.802 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.802 Contract files. Official contract...

  13. 48 CFR 204.802 - Contract files.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contract files. 204.802 Section 204.802 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.802 Contract files. Official contract...

  14. 48 CFR 204.802 - Contract files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contract files. 204.802 Section 204.802 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.802 Contract files. Official contract...

  15. 48 CFR 37.304 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contract clauses. 37.304 Section 37.304 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING SERVICE CONTRACTING Dismantling, Demolition, or Removal of Improvements 37.304 Contract clauses...

  16. 48 CFR 732.111 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111 Section 732.111 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may...

  17. 48 CFR 732.111 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 732.111 Section 732.111 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may...

  18. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  19. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  20. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  1. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  2. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  3. 48 CFR 3428.370 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clause. 3428.370 Section 3428.370 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 3428.370 Contract clause. The contracting...

  4. 48 CFR 1443.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 1443.205 Section 1443.205 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1443.205 Contract clauses. BPCs may establish procedures, when...

  5. Contingency contracting with school problems

    PubMed Central

    Cantrell, Robert P.; Cantrell, Mary Lynn; Huddleston, Clifton M.; Wooldridge, Ralph L.

    1969-01-01

    Contingency contracting procedures used in managing problems with school-age children involved analyzing teacher and/or parental reports of behavior problem situations, isolating the most probable contingencies then in effect, the range of reinforcers presently available, and the ways in which they were obtained. The authors prepared written contracts delineating remediative changes in reinforcement contingencies. These contracts specified ways in which the child could obtain existing individualized reinforcers contingent upon approximations to desired appropriate behaviors chosen as incompatible with the referral problem behaviors. Contract procedures were administered by the natural contingency managers, parents and/or teachers, who kept daily records of contracted behaviors and reinforcers. These records were sent to the authors and provided feedback on the progress of the case. Initial results of this procedure have been sufficiently encouraging to warrant recommending an experimental analysis of contingency contracting as a clinical method. PMID:16795222

  6. 48 CFR 232.703 - Contract funding requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contract funding... SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 232.703 Contract funding requirements. ...

  7. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  8. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  9. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  10. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  11. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  12. Hospital contract management: a descriptive profile.

    PubMed Central

    Alexander, J A; Lewis, B L

    1984-01-01

    Despite the dramatic growth in hospital contract management in the last decade, research only recently has begun to provide insights into the structure, operation, and effectiveness of these arrangements. Two descriptive questions regarding hospital contract management are addressed in an effort to increase correspondence between theoretical and evaluative research in this area: (1) how do contract-managed hospitals differ from traditionally managed hospitals? and (2) how do contract-managed hospitals differ from each other? Principal discriminating variables in the analyses are hospital size, control, urban-rural location, region, management organization control, and management organization size. Results of the analysis on a sample of 406 contract-managed hospitals and 401 unaffiliated hospitals reveal important differences between contract-managed and traditionally managed hospitals as well as among contract management organizations. These findings are discussed in terms of their implications for future research and performance evaluations on contract management arrangements. PMID:6490376

  13. 48 CFR 2816.602 - Labor-hour contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Labor-hour contracts. 2816... and Contract Types TYPES OF CONTRACTS Time-and-Materials, Labor-Hour, and Letter Contracts 2816.602 Labor-hour contracts. The limitations set forth in 2816.601 for time-and-material contracts also apply...

  14. 48 CFR 16.602 - Labor-hour contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Labor-hour contracts. 16... METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Time-and-Materials, Labor-Hour, and Letter Contracts 16.602 Labor-hour contracts. Description. A labor-hour contract is a variation of the time-and-materials...

  15. 48 CFR 3035.7000 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING Information Dissemination by Educational Institutions 3035.7000 Contract clause. The contracting officer may use the clause at (HSAR) 48 CFR 3052.235-70, Dissemination of Information—Educational Institutions, except in contracts that require coordination of information release. [71 FR 25771, May 2, 2006] ...

  16. 48 CFR 546.710 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clause. 546.710 Section 546.710 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 546.710 Contract clause. The Contracting officer shall insert the clause at...

  17. 48 CFR 846.710 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 846.710 Section 846.710 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 846.710 Contract clauses. The contracting officer shall insert the clause at...

  18. 48 CFR 43.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...

  19. 48 CFR 43.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...

  20. 48 CFR 43.205 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...

  1. 48 CFR 43.205 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...

  2. 48 CFR 43.205 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...

  3. 48 CFR 2943.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clauses. 2943.205 Section 2943.205 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 2943.205 Contract clauses. HCAs may establish procedures, or office policies, when...

  4. 48 CFR 432.412 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clause. 432.412 Section 432.412 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for Non-Commercial Items 432.412 Contract clause. The decision...

  5. 36 CFR 223.115 - Contract extensions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 223.115 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Timber Sale Contracts Contract Administration § 223.115 Contract...) That the purchaser has diligently performed in accordance with contract provisions and an approved plan...

  6. 48 CFR 2943.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Contract clauses. 2943.205 Section 2943.205 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 2943.205 Contract clauses. HCAs may establish procedures, or office policies, when...

  7. Static Verification for Code Contracts

    NASA Astrophysics Data System (ADS)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  8. Evaluation of the Regional Educational Laboratories. Final Report. NCEE 2015-4008

    ERIC Educational Resources Information Center

    Carison, Elaine; Bitterman, Amy; Zhang, Xiaodong; Lee, Hyunshik; Gutmann, Babette; Wills, Kerri; Sinclair, Beth

    2015-01-01

    This report is the second from the congressionally-mandated evaluation of the Regional Educational Laboratory (REL) program authorized by the Education Sciences Reform Act (P.L. 107-279). For this report, 8 (out of 24) impact study reports produced by the RELs under their 2006-2011 contracts and published by IES were rated by expert panels for…

  9. 48 CFR 16.103 - Negotiating contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Selecting Contract Types 16.103 Negotiating contract... basic profit motive of business enterprise, shall be used when the risk involved is minimal or can be...) Contracts on a firm fixed-price basis other than those for major systems or research and development, and (3...

  10. 17 CFR Appendix B to Part 43 - Enumerated Physical Commodity Contracts and Other Contracts

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Physical Commodity Contracts and Other Contracts Enumerated Physical Commodity Contracts Agriculture ICE Futures U.S. Cocoa ICE Futures U.S. Coffee C Chicago Board of Trade Corn ICE Futures U.S. Cotton No. 2 ICE... Trade Soybean Oil ICE Futures U.S. Sugar No. 11 ICE Futures U.S. Sugar No. 16 Chicago Board of Trade...

  11. 17 CFR Appendix B to Part 43 - Enumerated Physical Commodity Contracts and Other Contracts

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Commodity Contracts and Other Contracts Enumerated Physical Commodity Contracts Agriculture ICE Futures U.S. Cocoa ICE Futures U.S. Coffee C Chicago Board of Trade Corn ICE Futures U.S. Cotton No. 2 ICE Futures U... Soybean Oil ICE Futures U.S. Sugar No. 11 ICE Futures U.S. Sugar No. 16 Chicago Board of Trade Wheat...

  12. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  13. 28 CFR 70.48 - Contract provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Contract provisions. 70.48 Section 70.48...-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 70.48 Contract provisions. The... provisions in all contracts. The following provisions must also be applied to subcontracts. (a) Contracts in...

  14. 7 CFR 1466.21 - Contract requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., the participant must enter into a contract agreeing to implement one or more conservation practices. Technical services may be included in the contract. (b) An EQIP contract will: (1) Identify all conservation... agrees to assume all obligations, including operation and maintenance of the EQIP contract's conservation...

  15. 7 CFR 1466.21 - Contract requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., the participant must enter into a contract agreeing to implement one or more conservation practices. Technical services may be included in the contract. (b) An EQIP contract will: (1) Identify all conservation... agrees to assume all obligations, including operation and maintenance of the EQIP contract's conservation...

  16. 7 CFR 1466.21 - Contract requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., the participant must enter into a contract agreeing to implement one or more conservation practices. Technical services may be included in the contract. (b) An EQIP contract will: (1) Identify all conservation... agrees to assume all obligations, including operation and maintenance of the EQIP contract's conservation...

  17. 7 CFR 1466.21 - Contract requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., the participant must enter into a contract agreeing to implement one or more conservation practices. Technical services may be included in the contract. (b) An EQIP contract will: (1) Identify all conservation... agrees to assume all obligations, including operation and maintenance of the EQIP contract's conservation...

  18. 48 CFR 13.404 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Fast Payment Procedure 13.404 Contract clause. The contracting officer shall insert the clause at 52.213-1, Fast Payment Procedure, in solicitations and contracts when the conditions in 13.402 are applicable and it is intended that the fast payment...

  19. 48 CFR 13.404 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Fast Payment Procedure 13.404 Contract clause. The contracting officer shall insert the clause at 52.213-1, Fast Payment Procedure, in solicitations and contracts when the conditions in 13.402 are applicable and it is intended that the fast payment...

  20. 48 CFR 13.404 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Fast Payment Procedure 13.404 Contract clause. The contracting officer shall insert the clause at 52.213-1, Fast Payment Procedure, in solicitations and contracts when the conditions in 13.402 are applicable and it is intended that the fast payment...

  1. 48 CFR 13.404 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Fast Payment Procedure 13.404 Contract clause. The contracting officer shall insert the clause at 52.213-1, Fast Payment Procedure, in solicitations and contracts when the conditions in 13.402 are applicable and it is intended that the fast payment...

  2. 48 CFR 13.404 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Fast Payment Procedure 13.404 Contract clause. The contracting officer shall insert the clause at 52.213-1, Fast Payment Procedure, in solicitations and contracts when the conditions in 13.402 are applicable and it is intended that the fast payment...

  3. 48 CFR 1847.7001 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACT MANAGEMENT TRANSPORTATION Protection of the Florida Manatee 1847.7001 Contract clause. The contracting officer shall insert the clause at 1852.247-71, Protection of the Florida Manatee, in... the contract will involve use of waterways inhabited by manatees. The clause shall also be included in...

  4. 48 CFR 1847.7001 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACT MANAGEMENT TRANSPORTATION Protection of the Florida Manatee 1847.7001 Contract clause. The contracting officer shall insert the clause at 1852.247-71, Protection of the Florida Manatee, in... the contract will involve use of waterways inhabited by manatees. The clause shall also be included in...

  5. 48 CFR 1847.7001 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT TRANSPORTATION Protection of the Florida Manatee 1847.7001 Contract clause. The contracting officer shall insert the clause at 1852.247-71, Protection of the Florida Manatee, in... the contract will involve use of waterways inhabited by manatees. The clause shall also be included in...

  6. 48 CFR 1847.7001 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACT MANAGEMENT TRANSPORTATION Protection of the Florida Manatee 1847.7001 Contract clause. The contracting officer shall insert the clause at 1852.247-71, Protection of the Florida Manatee, in... the contract will involve use of waterways inhabited by manatees. The clause shall also be included in...

  7. 48 CFR 1847.7001 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACT MANAGEMENT TRANSPORTATION Protection of the Florida Manatee 1847.7001 Contract clause. The contracting officer shall insert the clause at 1852.247-71, Protection of the Florida Manatee, in... the contract will involve use of waterways inhabited by manatees. The clause shall also be included in...

  8. Reversible tetraplegia after percutaneous nephrostolithotomy and septic shock: a case of critical illness polyneuropathy and myopathy with acute onset and complete recovery

    PubMed Central

    2013-01-01

    Background Critical illness polyneuropathy (CIP) and critical illness myopathy (CIM) are complications causing weakness of respiratory and limb muscles in critically ill patients. As an important differential diagnosis of Guillain-Barré syndrome (GBS), CIP and CIM should be diagnosed with caution, after a complete clinical and laboratory examination. Although not uncommon in ICU, CIP and CIM as severe complications of percutaneous nephrostolithotomy (PNL) have not been documented in literature. Case presentation A 48-year-old Chinese woman was referred to our hospital, complaining of occasional pain in the right lower back for one month. Lithiasis was diagnosed by ultrasonographical and radiological examinations on the urinary system. PNL was indicated and performed. The patient developed CIP and CIM on the fourth day after PNL. Early recognition and treatment of the severe complications contributed to a satisfactory recovery of the patient. Conclusion This case expands our understanding of the complications of PNL and underscores the importance of differentiating CIP/CIM from GBS in case of such patients developing weakness after the treatment. Clinical characteristics and examination results should be carefully evaluated to make the diagnosis of CIP or CIM. Both anti-septic prophylaxis and control of hyperglycemia might be effective for the prevention of CIP or CIM; aggressive treatment on sepsis and multiple organ failure is considered to be the most effective measure to reduce the incidence of CIP/CIM. PMID:23409743

  9. An Analysis of Contracting Terms: Expanding the Body of Knowledge Within the Contract Management Profession

    DTIC Science & Technology

    1992-09-01

    products that are essential to the intended end use. (1987:110) According to Government Contract Law , brand name or equal is defined as: "The minimum...definitions agree, but Government Contract Law says it most clearly and succinctly; therefore, based on the above, the following was selected as the...followed by the words "or equal" (Government Contract Law , 1988:8-2). Breach of Contract The Dictionary of Purchasing Terms defines this term as "the

  10. Energy Lessons by Contract.

    ERIC Educational Resources Information Center

    Wagganer, John W.

    1981-01-01

    An elementary activity based energy education unit which utilizes student contracts is described. Examples of the preparation involved, student involvement entailed, and examples of contracts and grading criteria are included. (DS)

  11. 48 CFR 1316.602 - Labor-hour contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Labor-hour contracts. 1316... AND CONTRACT TYPES TYPES OF CONTRACTS Time-and-Materials, Labor-Hour, and Letter Contracts 1316.602 Labor-hour contracts. ...

  12. 48 CFR 216.504 - Indefinite-quantity contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Deputy Director, Defense Procurement and Acquisition Policy (Contract Policy and International... contracts. 216.504 Section 216.504 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Indefinite...

  13. Third party laboratory data management: Perspective with respect to clinical data management.

    PubMed

    Johnson, Jasmin; Kanagali, Vishwanath; Prabu, D

    2014-01-01

    Third party lab vendor provides support for laboratory, biological samples analytics data, collected during the clinical trial. Third party laboratory data is considered to be very significant for the clinical trial data management process. Although outsourcing these services is considered to be advantageous for clinical trials, there are some risks involved. Hence, pharmaceutical companies proactively select, track and evaluate third party vendors on a regular basis before, during and after the completion of the contract. The data manager has a significant role to play in effective management of third party vendor data.

  14. Third party laboratory data management: Perspective with respect to clinical data management

    PubMed Central

    Johnson, Jasmin; Kanagali, Vishwanath; Prabu, D.

    2014-01-01

    Third party lab vendor provides support for laboratory, biological samples analytics data, collected during the clinical trial. Third party laboratory data is considered to be very significant for the clinical trial data management process. Although outsourcing these services is considered to be advantageous for clinical trials, there are some risks involved. Hence, pharmaceutical companies proactively select, track and evaluate third party vendors on a regular basis before, during and after the completion of the contract. The data manager has a significant role to play in effective management of third party vendor data. PMID:24551587

  15. 32 CFR 169a.10 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Contracts. 169a.10 Section 169a.10 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.10 Contracts. When contract cost becomes unreasonable or performance...

  16. 32 CFR 169a.10 - Contracts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Contracts. 169a.10 Section 169a.10 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.10 Contracts. When contract cost becomes unreasonable or performance...

  17. 32 CFR 169a.10 - Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Contracts. 169a.10 Section 169a.10 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.10 Contracts. When contract cost becomes unreasonable or performance...

  18. 10 CFR 600.148 - Contract provisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Contract provisions. 600.148 Section 600.148 Energy... Nonprofit Organizations Post-Award Requirements § 600.148 Contract provisions. The recipient shall include... contracts. The following provisions shall also be applied to subcontracts. (a) Contracts in excess of the...

  19. 14 CFR 1274.509 - Contract provisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... breaches the contract terms, and provide for such remedial actions as may be appropriate. (b) All contracts... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contract provisions. 1274.509 Section 1274... COMMERCIAL FIRMS Procurement Standards § 1274.509 Contract provisions. The recipient shall include, in...

  20. 48 CFR 204.7106 - Contract modifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 204.7106 Contract modifications. (a) If new items are added, assign new contract line or subline item... those item numbers. (2) If the contracting officer decides to assign new identifications to existing contract or exhibit line items, the following rules apply— (i) Definitized and undefinitized items. (A) The...

  1. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...

  2. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...

  3. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...

  4. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...

  5. 48 CFR 822.305 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Hours and Safety Standards Act—nursing home care contract supplement, in solicitations and contracts for nursing home care when the FAR clause at 52.222-4, Contract Work Hours and Safety Standards Act—Overtime... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety Standards Act...

  6. 48 CFR 822.305 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Hours and Safety Standards Act—nursing home care contract supplement, in solicitations and contracts for nursing home care when the FAR clause at 52.222-4, Contract Work Hours and Safety Standards Act—Overtime... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety Standards Act...

  7. 45 CFR 800.401 - Contract performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Contract performance. 800.401 Section 800.401...-STATE PLAN PROGRAM Compliance § 800.401 Contract performance. (a) General. An MSPP issuer must perform... MSPP contract; (7) Applying performance standards for assuring contract quality as outlined at § 800...

  8. 45 CFR 800.401 - Contract performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Contract performance. 800.401 Section 800.401...-STATE PLAN PROGRAM Compliance § 800.401 Contract performance. (a) General. An MSPP issuer must perform... MSPP contract; (7) Applying performance standards for assuring contract quality as outlined at § 800...

  9. 48 CFR 1552.217-72 - Option to extend the term of the contract-cost-plus-award-fee contract.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the contract-cost-plus-award-fee contract. 1552.217-72 Section 1552.217-72 Federal Acquisition...-award-fee contract. As prescribed in 1517.208(c), insert this contract clause in cost-plus-award-fee... Term of the Contract—Cost-Plus-Award-Fee Contract (APR 1984) (a) The Government has the option to...

  10. 48 CFR 342.7001 - Contract monitoring responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Contract monitoring responsibilities. 342.7001 Section 342.7001 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contract Monitoring 342.7001 Contract monitoring...

  11. 48 CFR 342.7001 - Contract monitoring responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contract monitoring responsibilities. 342.7001 Section 342.7001 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contract Monitoring 342.7001 Contract monitoring...

  12. 48 CFR 342.7001 - Contract monitoring responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Contract monitoring responsibilities. 342.7001 Section 342.7001 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contract Monitoring 342.7001 Contract monitoring...

  13. 48 CFR 342.7001 - Contract monitoring responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Contract monitoring responsibilities. 342.7001 Section 342.7001 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contract Monitoring 342.7001 Contract monitoring...

  14. Contract Design: Financial Options and Risk

    PubMed Central

    Amelung, Volker E.; Juhnke, Christin

    2018-01-01

    Introduction: Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. When designing healthcare options contractors are faced with a variety of financial options. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore contract-specific investments are an obstacle to the efficient operation of ACOs. Methods: A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the second in a row of three that are all published in this issue and contribute to a specific issue in designing healthcare contracts. The first dealt with the organisation of contracts and information asymmetries, while part 3 concludes with the question of risk management and evaluation. The specific research question of this second article focusses on the financial options and reimbursement schemes that are available to define healthcare contracts. Results: A healthcare contract is a relational contract, which determines the level of reimbursement, the scope of services and the quality between service providers and payers, taking account of the risks relating to population and performance. A relational contract is an agreement based upon assumption of a longer timeframe. A major obstacle to the practical implementation of healthcare contracts is the prognosis of the inflows and outflows due to the actuarial risks of the insured population. Financing conditions and reimbursement arrangements that are based on a prospectively determined fixed price, have a significant drawback: it is very difficult to take the differences in health status and the utilisation of

  15. Contract Design: Financial Options and Risk.

    PubMed

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. When designing healthcare options contractors are faced with a variety of financial options. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the second in a row of three that are all published in this issue and contribute to a specific issue in designing healthcare contracts. The first dealt with the organisation of contracts and information asymmetries, while part 3 concludes with the question of risk management and evaluation. The specific research question of this second article focusses on the financial options and reimbursement schemes that are available to define healthcare contracts. A healthcare contract is a relational contract, which determines the level of reimbursement, the scope of services and the quality between service providers and payers, taking account of the risks relating to population and performance. A relational contract is an agreement based upon assumption of a longer timeframe. A major obstacle to the practical implementation of healthcare contracts is the prognosis of the inflows and outflows due to the actuarial risks of the insured population. Financing conditions and reimbursement arrangements that are based on a prospectively determined fixed price, have a significant drawback: it is very difficult to take the differences in health status and the utilisation of distinct insured clientele

  16. 48 CFR 12.207 - Contract type.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contracts or fixed-price contracts with economic price adjustment for the acquisition of commercial items... fixed-price with economic price adjustment contracts (e.g., by limiting the value or length of the time... maximize the use of firm-fixed-price or fixed-price with economic price adjustment contracts on future...

  17. 43 CFR 2.228 - Government contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Government contracts. 2.228 Section 2.228 Public Lands: Interior Office of the Secretary of the Interior FREEDOM OF INFORMATION ACT; RECORDS AND TESTIMONY Privacy Act § 2.228 Government contracts. (a) Required contract provisions. When a contract...

  18. 43 CFR 2.228 - Government contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Government contracts. 2.228 Section 2.228 Public Lands: Interior Office of the Secretary of the Interior FREEDOM OF INFORMATION ACT; RECORDS AND TESTIMONY Privacy Act § 2.228 Government contracts. (a) Required contract provisions. When a contract...

  19. 43 CFR 2.53 - Government contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Government contracts. 2.53 Section 2.53 Public Lands: Interior Office of the Secretary of the Interior RECORDS AND TESTIMONY; FREEDOM OF INFORMATION ACT Privacy Act § 2.53 Government contracts. (a) Required contract provisions. When a contract...

  20. 43 CFR 2.53 - Government contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Government contracts. 2.53 Section 2.53 Public Lands: Interior Office of the Secretary of the Interior RECORDS AND TESTIMONY; FREEDOM OF INFORMATION ACT Privacy Act § 2.53 Government contracts. (a) Required contract provisions. When a contract...

  1. 43 CFR 2.53 - Government contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Government contracts. 2.53 Section 2.53 Public Lands: Interior Office of the Secretary of the Interior RECORDS AND TESTIMONY; FREEDOM OF INFORMATION ACT Privacy Act § 2.53 Government contracts. (a) Required contract provisions. When a contract...

  2. 48 CFR 432.703 - Contract funding requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract funding requirements. 432.703 Section 432.703 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 432.703 Contract funding requirements. ...

  3. 48 CFR 2932.703 - Contract funding requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract funding requirements. 2932.703 Section 2932.703 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 2932.703 Contract funding requirements. (a...

  4. 48 CFR 32.703 - Contract funding requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract funding requirements. 32.703 Section 32.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 32.703 Contract funding requirements. ...

  5. 48 CFR 632.703 - Contract funding requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract funding requirements. 632.703 Section 632.703 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 632.703 Contract funding requirements. ...

  6. 48 CFR 632.703 - Contract funding requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contract funding requirements. 632.703 Section 632.703 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 632.703 Contract funding requirements. ...

  7. 48 CFR 432.703 - Contract funding requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contract funding requirements. 432.703 Section 432.703 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 432.703 Contract funding requirements. ...

  8. 48 CFR 32.703 - Contract funding requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contract funding requirements. 32.703 Section 32.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 32.703 Contract funding requirements. ...

  9. 48 CFR 2932.703 - Contract funding requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Contract funding requirements. 2932.703 Section 2932.703 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 2932.703 Contract funding requirements. (a...

  10. 48 CFR 32.703 - Contract funding requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contract funding requirements. 32.703 Section 32.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 32.703 Contract funding requirements. ...

  11. 48 CFR 432.113 - Customary contract financing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... financing. 432.113 Section 432.113 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.113 Customary contract financing. The contracting officer may determine the necessity for customary contract financing. The...

  12. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  13. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  14. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  15. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  16. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  17. LABORATORY STUDY FOR THE REDUCTION OF CHROME (VI) TO CHROME (III) USING SODIUM METABISULFITE UNDER ACIDIC CONDITIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DUNCAM JB; GUTHRIE MD; LUECK KJ

    2007-07-18

    This report describes the results from RPP-PLAN-32738, 'Test Plan for the Effluent Treatment Facility to Reduce Chrome(VI) to Chrome(I1I) in the Secondary Waste Stream', using sodium metabisulfite. Appendix A presents the report as submitted by the Center for Laboratory Sciences (CLS) to CH2M HILL Hanford Group, Inc. The CLS carried out the laboratory effort under Contract Number 21065, release Number 30. This report extracts the more pertinent aspects of the laboratory effort.

  18. 7 CFR 634.25 - Contracting.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... agrees to apply his or her water-quality plan. Any person who controls, or shares control, of the farm... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.25 Contracting... of the farm, ranch, or other land. The administering agency is to determine the acceptability of the...

  19. 48 CFR 1515.606-70 - Contracting methods.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Contracting methods. 1515... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1515.606-70 Contracting methods. The Department of Housing and Urban Development-Independent Agencies Appropriation Act...

  20. 48 CFR 1515.606-70 - Contracting methods.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Contracting methods. 1515... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1515.606-70 Contracting methods. The Department of Housing and Urban Development-Independent Agencies Appropriation Act...

  1. 48 CFR 1515.606-70 - Contracting methods.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contracting methods. 1515... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1515.606-70 Contracting methods. The Department of Housing and Urban Development-Independent Agencies Appropriation Act...

  2. 48 CFR 1515.606-70 - Contracting methods.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracting methods. 1515... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1515.606-70 Contracting methods. The Department of Housing and Urban Development-Independent Agencies Appropriation Act...

  3. 48 CFR 1515.606-70 - Contracting methods.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Contracting methods. 1515... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1515.606-70 Contracting methods. The Department of Housing and Urban Development-Independent Agencies Appropriation Act...

  4. 48 CFR 842.101 - Contract audit responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract audit responsibilities. 842.101 Section 842.101 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Audit Services 842.101 Contract...

  5. 48 CFR 642.272 - DOSAR contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false DOSAR contract clauses. 642.272 Section 642.272 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.272 DOSAR contract clauses...

  6. 48 CFR 3416.303 - Cost-sharing contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost-sharing contracts. 3416.303 Section 3416.303 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 3416.303...

  7. 48 CFR 22.610 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Walsh-Healey Public Contracts Act 22.610... Contracts Act, in solicitations and contracts covered by the Act (see 22.603, 22.604, and 22.605). [61 FR... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clause. 22.610...

  8. 36 CFR 1008.8 - Government contracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Government contracts. 1008.8 Section 1008.8 Parks, Forests, and Public Property PRESIDIO TRUST REQUESTS UNDER THE PRIVACY ACT § 1008.8 Government contracts. (a) Required contract provisions. When a contract provides for the operation by or on...

  9. 36 CFR 1008.8 - Government contracts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Government contracts. 1008.8 Section 1008.8 Parks, Forests, and Public Property PRESIDIO TRUST REQUESTS UNDER THE PRIVACY ACT § 1008.8 Government contracts. (a) Required contract provisions. When a contract provides for the operation by or on...

  10. 36 CFR 1008.8 - Government contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Government contracts. 1008.8 Section 1008.8 Parks, Forests, and Public Property PRESIDIO TRUST REQUESTS UNDER THE PRIVACY ACT § 1008.8 Government contracts. (a) Required contract provisions. When a contract provides for the operation by or on...

  11. 36 CFR 1008.8 - Government contracts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Government contracts. 1008.8 Section 1008.8 Parks, Forests, and Public Property PRESIDIO TRUST REQUESTS UNDER THE PRIVACY ACT § 1008.8 Government contracts. (a) Required contract provisions. When a contract provides for the operation by or on...

  12. Muscular contraction stimulates posterior hypothalamic neurons.

    PubMed

    Waldrop, T G; Stremel, R W

    1989-02-01

    Recent studies have suggested that the subthalamic locomotor region (STLR) of the posterior hypothalamus is involved in modulating cardiorespiratory responses to feedback from contracting muscles. The purpose of this study was to determine whether neurons in this hypothalamic region alter their discharge frequency during contraction of hindlimb muscles. Stainless steel electrodes were used to record single-unit activity of STLR neurons during static and rhythmic contractions of hindlimb muscles in anesthetized cats. Recordings were also made from neurons in areas outside but surrounding the subthalamic locomotor region. Contraction of the triceps surae muscles was induced by stimulation of the peripheral cut ends of the L7 and S1 ventral roots. Both static and rhythmic contractions of the triceps surae evoked an increase in the discharge rate of the majority of the STLR cells studied. Two types of excitatory responses were observed: 1) abrupt increases in discharge frequency at the onset of muscular contraction and 2) a delayed more gradual increase in firing. Most of the cells that responded to muscular contraction could be activated by mechanical probing of the triceps surae muscles. However, the changes in discharge frequency were unrelated to changes in arterial pressure occurring during muscular contraction. Most of the neurons located outside the STLR were slightly inhibited by or did not respond to muscular contraction. Thus input from contracting muscles exerts predominantly an excitatory effect on neurons in the posterior hypothalamus. These results are consistent with other studies which have concluded that this hypothalamic site is involved in influencing the cardiorespiratory responses to muscular contraction.

  13. Regional Educational Laboratory Researcher-Practitioner Partnerships: Documenting the Research Alliance Experience. REL 2018-291

    ERIC Educational Resources Information Center

    Scher, Lauren; McCowan, Ronald; Castaldo-Walsh, Cynthia

    2018-01-01

    This report provides a detailed account of the Regional Educational Laboratory (REL) Program's experience establishing and supporting research-practice partnerships (called "research alliances") during its 2012-17 contract cycle. The report adds to the growing literature base on researcher-practitioner partnerships by sharing how the…

  14. Managing TIAA-CREF Contracts

    ERIC Educational Resources Information Center

    Bastable, C. W.; Brady, Gerald P.

    1976-01-01

    Complexities in managing TIAA-CREF contracts are reviewed. Attention is directed toward participation, period considerations, selection of retirement age, retirement income transition, estate considerations and beneficiaries, voluntary additional contributions, and supplemental retirement annuity contracts. (LBH)

  15. 48 CFR 716.303 - Cost-sharing contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-sharing contracts. 716.303 Section 716.303 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.303 Cost-sharing...

  16. 48 CFR 716.303 - Cost-sharing contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Cost-sharing contracts. 716.303 Section 716.303 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.303 Cost-sharing...

  17. 48 CFR 1332.114 - Unusual contract financing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 1332.114 Unusual contract financing. The designee authorized to approve unusual contract financing arrangements is set forth in CAM...

  18. 48 CFR 232.007 - Contract financing payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract financing... SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 232.007 Contract financing payments. (a) DoD policy is to make contract financing payments as quickly as possible. Generally...

  19. 48 CFR 432.114 - Unusual contract financing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.114 Unusual contract financing. The HCA is authorized to approve unusual contract financing. The signed determination and finding...

  20. 78 FR 41331 - Federal Acquisition Regulation; Publicizing Contract Actions; Contracting by Negotiation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Parts 5 and 15 Federal Acquisition Regulation; Publicizing Contract Actions; Contracting by Negotiation CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 1 (Parts 1 to 51), revised...

  1. 48 CFR 32.007 - Contract financing payments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contract financing... GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 32.007 Contract financing payments. (a)(1) Unless... section, the due date for making contract financing payments by the designated payment office is the 30th...

  2. Stretch-induced contraction in pulmonary arteries.

    PubMed

    Kulik, T J; Evans, J N; Gamble, W J

    1988-12-01

    Stretch stimulates contraction of systemic blood vessels, but the response has not been described in pulmonary vessels. To determine whether pulmonary arteries contract when stretched, isolated cylindrical segments of pulmonary arteries were suspended between two parallel wires, stretched, and the active force was generated in response to stretch measured. Eighty-nine percent of segments from small (in situ diameter less than 1,000 microns) feline pulmonary arteries contracted when stretched, and in 65% of these the magnitude of stretch was related to the magnitude of contraction. Large (in situ diameter greater than or equal to 1,000 microns) feline pulmonary arteries did not contract with stretch. Multiple, rapidly repeated stretches resulted in a diminution of active force development. Stretch-induced contraction required external Ca2+ and was abolished by diltiazem (10 microns), but it was not affected by phenoxybenzamine, phentolamine, diethylcarbamazine, or mechanical removal of endothelium. Indomethacin blunted but did not abolish stretch-induced contraction, an effect that may have been nonspecific. This study suggests that stretch can act, probably directly, on smooth muscle in small feline pulmonary arteries to elicit contraction and that it may be a determinant of pulmonary vascular tone. In addition, feline pulmonary arteries are suitable for the in vitro study of stretch-induced contraction.

  3. Contractions

    MedlinePlus

    ... feel tightening of your uterus muscles at irregular intervals or a squeezing sensation in your lower abdomen ... beginning of childbirth. These contractions come at regular intervals, usually move from the back to the lower ...

  4. Contraction velocity influence the magnitude and etiology of neuromuscular fatigue during repeated maximal contractions.

    PubMed

    Morel, B; Clémençon, M; Rota, S; Millet, G Y; Bishop, D J; Brosseau, O; Rouffet, D M; Hautier, C A

    2015-10-01

    This study aimed to compare the magnitude and etiology of neuromuscular fatigue during maximal repeated contractions performed in two contraction modes (concentric vs isometric) and at two contraction velocities (30/s vs 240°/s). Eleven lower limb-trained males performed 20 sets of maximal contractions at three different angular velocities: 0°/s (KE0), 30/s (KE30), and 240°/s (KE240). Cumulated work, number of contraction, duty cycle, and contraction time were controlled. Torque, superimposed and resting twitches, as well as gas exchange, were analyzed. Increasing contraction velocity was associated with greater maximal voluntary torque loss (KE0: -9.8 ± 3.9%; KE30: -16.4 ± 8.5%; KE240: -32.6 ± 6.3%; P < 0.05). Interestingly, the torque decrease was similar for a given cumulated work. Compared with KE0, KE240 generated a greater evoked torque loss (Db100: -24.3 ± 5.3% vs -5.9 ± 6.9%; P < 0.001), a higher O2 consumption (23.7 ± 6.4 mL/min/kg vs 15.7 ± 3.8 mL/min/kg; P < 0.001), but a lower voluntary activation (VA) loss (-4.3 ± 1.6% vs -11.2 ± 4.9%; P < 0.001). The neuromuscular perturbations were intermediate for KE30 (Db100: -10.0 ± 6.8%; VA: -7.2 ± 2.8%). Although the amount of mechanical work cumulated strongly determined the magnitude of torque decrease, the contraction velocity and mode influenced the origin of the neuromuscular fatigue. The metabolic stress and peripheral fatigue increased but reduction of VA is attenuated when the contraction velocity increased from 0°/s to 240°/s. © 2014 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  5. 48 CFR 4.804-2 - Closeout of the contracting office files if another office administers the contract.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Closeout of the contracting office files if another office administers the contract. 4.804-2 Section 4.804-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-2 Closeout of the contracting...

  6. 48 CFR 342.302 - Contract administration functions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Contract Administration Office Functions 342.302 Contract administration..., contractor employees are considered “visitors.” Further, for any proposed or existing construction contract...

  7. 32 CFR 21.625 - Contract.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Contract. 21.625 Section 21.625 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.625 Contract. See the definition for procurement contract in this...

  8. 32 CFR 21.625 - Contract.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Contract. 21.625 Section 21.625 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.625 Contract. See the definition for procurement contract in this...

  9. 32 CFR 21.625 - Contract.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Contract. 21.625 Section 21.625 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.625 Contract. See the definition for procurement contract in this...

  10. 32 CFR 21.625 - Contract.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Contract. 21.625 Section 21.625 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.625 Contract. See the definition for procurement contract in this...

  11. 32 CFR 21.625 - Contract.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Contract. 21.625 Section 21.625 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.625 Contract. See the definition for procurement contract in this...

  12. 7 CFR 632.22 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... signs a contract is obligated to apply or arrange for the application of the land use and conservation..., joint participation is permitted only if it will result in better land use and treatment than individual...-sharing contracts. A land user who has an approved reclamation plan may enter into a contract with NRCS to...

  13. 48 CFR 970.2210 - Service Contract Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Service Contract Act. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2210 Service Contract Act. The Service Contract Act of 1965 is not applicable to contracts for the management and operation of...

  14. 48 CFR 942.270-2 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 942.270-2 Section 942.270-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 942.270-2 Contract clause. The clause at 952...

  15. 48 CFR 501.404-70 - Contract action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract action. 501.404... Contract action. Contract action. A contract action, for the purpose of determining whether an individual or class deviation is appropriate, has the same meaning as that used for reporting contract actions...

  16. Development and evaluation of clear-water pier and contraction scour envelope curves in the Coastal Plain and Piedmont Provinces of South Carolina

    USGS Publications Warehouse

    Benedict, Stephen T.; Caldwell, Andral W.

    2016-01-01

    The U.S. Geological Survey in cooperation with the South Carolina Department of Transportation collected clear-water pier- and contraction-scour data at 116 bridges in the Coastal Plain and Piedmont Physiographic Provinces of South Carolina. Pier-scour depths collected in both provinces ranged from 0 to 8.0 feet. Contraction-scour depths collected in the Coastal Plain ranged from 0 to 3.9 feet. Using hydraulic data estimated with a one-dimensional flow model, predicted clear-water scour depths were computed with scour equations from the Federal Highway Administration Hydraulic Engineering Circular 18 and compared with measured scour. This comparison indicated that predicted clear-water scour depths, in general, exceeded measured scour depths and at times were excessive. Predicted clear-water contraction scour, however, was underpredicted approximately 30 percent of the time by as much as 7.1 feet. The investigation focused on clear-water pier scour, comparing trends in the laboratory and field data. This comparison indicated that the range of dimensionless variables (relative depth, flow intensity, relative grain size) used in laboratory investigations of pier scour, were similar to the range for field data in South Carolina, further indicating that laboratory relations may have some applicability to field conditions in South Carolina. Variables determined to be important in developing pier scour in laboratory studies were investigated to understand their influence on the South Carolina field data, and many of these variables appeared to be insignificant under field conditions in South Carolina. The strongest explanatory variables were pier width and approach velocity. Envelope curves developed from the field data are useful tools for evaluating reasonable ranges of clear-water pier and contraction scour in South Carolina. A modified version of the Hydraulic Engineering Circular 18 pier-scour equation also was developed as a tool for evaluating clearwater pier

  17. Swelling and Contraction of Corn Mitochondria 1

    PubMed Central

    Stoner, C. D.; Hanson, J. B.

    1966-01-01

    A survey has been made of the properties of corn mitochondria in swelling and contraction. The mitochondria swell spontaneously in KCl but not in sucrose. Aged mitochondria will swell rapidly in sucrose if treated with citrate or EDTA. Swelling does not impair oxidative phosphorylation if bovine serum albumin is present. Contraction can be maintained or initiated with ATP + Mg or an oxidizable substrate, contraction being more rapid with the substrate. Magnesium is not required for substrate powered contraction. Contraction powered by ATP is accompanied by the release of phosphate. Oligomycin inhibits both ATP-powered contraction and the release of phosphate. However, it does not affect substrate-powered contraction. Substrate powered contraction is inhibited by electron-transport inhibitors. The uncoupler, carbonyl cyanide m-chlorophenyl hydrazone, accelerates swelling and inhibits both ATP-and substrate-powered contraction. However, the concentrations required are well in excess of those required to produce uncoupling and to accelerate adenosine triphosphatase; the concentrations required inhibit respiration in a phosphorylating medium. Phosphate is a very effective inhibitor of succinate-powered contraction. Neither oligomycin nor Mg affects the phosphate inhibition. Phosphate is less inhibitory with the ATP-powered contraction. The results are discussed in terms of a hypothesis that contraction is associated with a nonphosphorylated high energy intermediate of oxidative phosphorylation. Images PMID:16656248

  18. Contract law for physicians. The basics.

    PubMed

    Eelkema, R

    1989-02-01

    As part of the Minnesota Medical Association's ongoing contract review process, this article provides information to help educate physicians about the major managed care contracts being offered to them. The information provided is not intended to, nor should it be a substitute for legal advice pertaining to an individual's practice and specific contracts with third parties. The MMA will not be making recommendations regarding the merits of any particular contract. A decision to enter into a contract rests with the physician and his or her clinic in consultation with private legal counsel.

  19. 24 CFR 983.203 - HAP contract information.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract information. 983.203... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.203 HAP contract information. The HAP contract must specify: (a) The total number of contract units by number of bedrooms; (b...

  20. Joint Implications for Contracted Logistics

    DTIC Science & Technology

    2007-03-30

    authority with the host nation country and policy on using UCMJ for contracted personnel. As tailored theater policies are developed and contracting...responsibility, this paper recommends better joint training, leader development and joint enablers for contracting operations. JOINT...U.S. Joint Forces Command (JFCOM) are analyzing Congressional and DOD policy to develop procedures and force structure to support contractor

  1. Armed Services Board of Contract Appeals: Analysis of Sustained Decisions on DoD Supply Contract Disputes.

    DTIC Science & Technology

    1986-12-01

    Contract Law are the primary sources of policy and interpretation, since these are the informa- tion sources relied upon by field contracting officers, in...FAR is the governing regulation of the Government [Ref. 13:pp. 1106-7]. In no other area of contract law has one party been given such complete...Washington: Government Printing Office, April 1984. 4. Mahoy, J.O., Government Contract Law , 6th ed., Gunter Air Force Station AL, Extension Course Institute

  2. 48 CFR 904.7201 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MATTERS Public Affairs 904.7201 Contract clause. The contracting officer shall insert the clause at 952.204-75, Public Affairs, in solicitations and contracts that require the contractor to release...

  3. Contract management survey 2002.

    PubMed

    Hoppszallern, Suzanna

    2002-10-01

    Spending on clinical contracts continues to outpace spending on business services, but may be leveling off. The 12th annual Contract Management Survey shows that the performance of clinical vendors is now comparable to business service vendors in meeting savings targets. Both business and clinical vendors are receiving higher marks from hospital leaders, but execs quickly respond to low marks by bringing the service back in-house of changing vendors. This report examines trends in outsourcing, satisfaction levels, the decision-making process, contract features and performance, and spending.

  4. 23 CFR 635.125 - Termination of contract.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... contract may be terminated because of circumstances beyond the control of the contractor. (b) The STD prior..., advertising, and award procedures are to be followed when a STD awards the contract for completion of a terminated Federal-aid contract. (d) When a STD awards the contract for completion of a Federal-aid contract...

  5. 23 CFR 635.125 - Termination of contract.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... contract may be terminated because of circumstances beyond the control of the contractor. (b) The STD prior..., advertising, and award procedures are to be followed when a STD awards the contract for completion of a terminated Federal-aid contract. (d) When a STD awards the contract for completion of a Federal-aid contract...

  6. 23 CFR 635.125 - Termination of contract.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... contract may be terminated because of circumstances beyond the control of the contractor. (b) The STD prior..., advertising, and award procedures are to be followed when a STD awards the contract for completion of a terminated Federal-aid contract. (d) When a STD awards the contract for completion of a Federal-aid contract...

  7. 23 CFR 635.125 - Termination of contract.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... contract may be terminated because of circumstances beyond the control of the contractor. (b) The STD prior..., advertising, and award procedures are to be followed when a STD awards the contract for completion of a terminated Federal-aid contract. (d) When a STD awards the contract for completion of a Federal-aid contract...

  8. 29 CFR 4.145 - Extended term contracts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Extended term contracts. 4.145 Section 4.145 Labor Office of...'Hara Service Contract Act Changes in Contract Coverage § 4.145 Extended term contracts. (a) Sometimes service contracts are entered into for an extended term exceeding one year; however, their continuation in...

  9. 29 CFR 4.145 - Extended term contracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Extended term contracts. 4.145 Section 4.145 Labor Office...'Hara Service Contract Act Changes in Contract Coverage § 4.145 Extended term contracts. (a) Sometimes service contracts are entered into for an extended term exceeding one year; however, their continuation in...

  10. 29 CFR 4.145 - Extended term contracts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Extended term contracts. 4.145 Section 4.145 Labor Office...'Hara Service Contract Act Changes in Contract Coverage § 4.145 Extended term contracts. (a) Sometimes service contracts are entered into for an extended term exceeding one year; however, their continuation in...

  11. 29 CFR 4.145 - Extended term contracts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Extended term contracts. 4.145 Section 4.145 Labor Office...'Hara Service Contract Act Changes in Contract Coverage § 4.145 Extended term contracts. (a) Sometimes service contracts are entered into for an extended term exceeding one year; however, their continuation in...

  12. 29 CFR 4.145 - Extended term contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Extended term contracts. 4.145 Section 4.145 Labor Office of...'Hara Service Contract Act Changes in Contract Coverage § 4.145 Extended term contracts. (a) Sometimes service contracts are entered into for an extended term exceeding one year; however, their continuation in...

  13. Field monitoring and evaluation of a residential gas-engine-driven heat pump: Volume 2, Heating season

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, J.D.

    1995-11-01

    The Federal Government is the largest single energy consumer in the United States; consumption approaches 1.5 quads/year of energy (1 quad = 10{sup 15} Btu) at a cost valued at nearly $10 billion annually. The US Department of Energy (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the Federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US Government. Pacific Northwest Laboratory (PNL) is one of four DOE national multiprogram laboratories that participate in themore » NTDP by providing technical expertise and equipment to evaluate new, energy-saving technologies being studied and evaluated under that program. This two-volume report describes a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology -- a gas-engine-driven heat pump. The unit was installed at a single residence at Fort Sam Houston, a US Army base in San Antonio, Texas, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were York International, the heat pump manufacturer; Gas Research Institute (GRI), the technology developer; City Public Service of San Antonio, the local utility; American Gas Cooling Center (AGCC); Fort Sam Houston; and PNL.« less

  14. 78 FR 10642 - Service Contracts Inventory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ...'' and then select ``Begin Web- based ADAMS Search.'' For problems with ADAMS, please contact the NRC's... of performance; 5. Whether the contract is a personal services contract; and 6. Whether the contract...

  15. Duration of general practitioner contracts.

    PubMed

    Abelsen, Birgit; Gaski, Margrete; Brandstorp, Helen

    2015-12-01

    The regular GP scheme is intended to promote continuity in the relationship between doctor and patient. The duration of GP contracts is therefore a key factor in the success of the scheme. This study examines how long the GP contracts last and whether their duration varies according to doctors' gender and age, municipality size and list size. The study encompasses 7,359 GP contracts throughout Norway, entered into between municipalities and doctors in the period 1 May 2001 - 1 May 2014. Duration is measured as the time from which the contract was signed until its expiry or the end of the study period. The material was analysed with measures of central tendencies and dispersion, Kaplan-Meier survival curve analysis and Cox proportional hazards regression. Median duration of a GP contract at the time of the study was 5.91 years. It varied between 2.75 years in the smallest municipalities and 8.37 years in the largest ones. The duration of a GP contract increased significantly if the doctor was a woman, or with the doctor's age at the start of the contract, increased municipality size and increased list size. If it is assumed that continuity in the doctor-patient relationship provides a qualitatively better GP service, the results indicate that patients in small municipalities are generally offered a lower-quality service than patients in large municipalities.

  16. 48 CFR 10.003 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MARKET RESEARCH 10.003 Contract clause. The contracting officer shall insert the clause at 52.210-1, Market Research, in solicitations and contracts over $5 million for the procurement of items other than...

  17. 48 CFR 370.404 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contract clause. The Contracting Officer shall insert the clause in 352.270-5(b), Care of Live Vertebrate Animals, in solicitations, contracts, and orders that involve live vertebrate animals. [75 FR 21512, Apr...

  18. Laboratory practical to study the differential innervation pathways of urinary tract smooth muscle.

    PubMed

    Rembetski, Benjamin E; Cobine, Caroline A; Drumm, Bernard T

    2018-06-01

    In the mammalian lower urinary tract, there is a reciprocal relationship between the contractile state of the bladder and urethra. As the bladder fills with urine, it remains relaxed to accommodate increases in volume, while the urethra remains contracted to prevent leakage of urine from the bladder to the exterior. Disruptions to the normal contractile state of the bladder and urethra can lead to abnormal micturition patterns and urinary incontinence. While both the bladder and urethra are smooth-muscle organs, they are differentially contracted by input from cholinergic and sympathetic nerves, respectively. The laboratory practical described here provides an experiential approach to understanding the anatomy of the lower urinary tract. Several key factors in urinary tract physiology are outlined, e.g., the bladder is contracted by activation of the parasympathetic pathway via cholinergic stimulation on muscarinic receptors, whereas the urethra is contracted by activation of the sympathetic pathway via adrenergic stimulation on α 1 -adrenoceptors. This is achieved by measuring the force generated by bladder and urethra smooth muscle to demonstrate that acetylcholine contracts the smooth muscle of the bladder, whereas adrenergic agonists contract the urethral smooth muscle. An inhibition of these effects is also demonstrated by application of the muscarinic receptor antagonist atropine and the α 1 -adrenergic receptor blocker phentolamine. A list of suggested techniques and exam questions to evaluate student understanding on this topic is also provided.

  19. Site Environmental Report for 2016 Sandia National Laboratories California.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE’s National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology and Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. This Site Environmental Report for 2016 was prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOE 2012). The report provides a summary ofmore » environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2016, unless noted otherwise. General site and environmental program information is also included.« less

  20. Contract Design: Risk Management and Evaluation.

    PubMed

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial) dependence of the agent's returns on the provider's gain level. Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting. Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods of risk adjustment have widely differing model and forecast