Sample records for laboratory project contract

  1. Superfund Contract Laboratory Program

    EPA Pesticide Factsheets

    The Contract Laboratory Program (CLP) is a national network of EPA personnel, commercial laboratories, and support contractors whose primary mission is to provide data of known and documented quality to the Superfund program.

  2. Incentive contracts for development projects

    NASA Astrophysics Data System (ADS)

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  3. 30 CFR 881.6 - Project contract.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a) Upon approval of the project by the Secretary, execution of the cooperative agreement, and receipt of...

  4. 30 CFR 881.6 - Project contract.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a) Upon approval of the project by the Secretary, execution of the cooperative agreement, and receipt of...

  5. 30 CFR 881.6 - Project contract.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a) Upon approval of the project by the Secretary, execution of the cooperative agreement, and receipt of...

  6. 30 CFR 881.6 - Project contract.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a) Upon approval of the project by the Secretary, execution of the cooperative agreement, and receipt of...

  7. 30 CFR 881.6 - Project contract.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., if the work is to be done in phases, a series of project contracts, entered into by the State and its... phase of a project, is limited to the estimated costs established in the cooperative agreement. If the... representative present. (d) If the State amends a project contract, or issues a change order thereunder, and the...

  8. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  9. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  10. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  11. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  12. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  13. Laboratory animal-based collaborations and contracts beyond the border.

    PubMed

    Stark, Dennis

    2006-06-01

    There is a 'dollars crunch' at your institution. At a management meeting a discussion develops around the idea of outsourcing some of the future animal-based work to a facility located in another country. As a leader of the laboratory animal program, you need to answer the question: "What do we need to consider before agreeing to an overseas contract to complement our internal efforts?" The author sets out to answer this question as it relates to issues of animal care and use, regulatory and ethical concerns, legal obligations, and oversight of the work. The article focuses on international contracts and collaborations, but many of the principles discussed are also applicable to interinstitutional collaborations and contracts within the country where the laboratory animal program is based.

  14. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  15. Safety in the Chemical Laboratory: Contracts to Dispose of Laboratory Waste.

    ERIC Educational Resources Information Center

    Fischer, Kenneth E.

    1985-01-01

    Presents a sample contract for disposing of hazardous wastes in an environmentally sound, timely manner in accordance with all federal, state, and local requirements. Addresses situations where hazardous waste must be disposed of outside the laboratory and where alternate disposal methods are not feasible. (JN)

  16. Crafting Contracts for International Projects.

    ERIC Educational Resources Information Center

    Richey, John B.

    1993-01-01

    A discussion of the drafting of contracts for international sponsored research projects focuses on the terms of award that relate either to sensitive topics for international sponsors or to significant legal or financial risk to an institution. Issues specific to newly industrializing and developing countries are highlighted. (MSE)

  17. Project management: importance for diagnostic laboratories.

    PubMed

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  18. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each projectmore » within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.« less

  19. 77 FR 38267 - Information Collection; Role of Communities in Stewardship Contracting Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ...) Nature of roles played by the entities involved in developing agreement or contract plans, (c) Benefits... Collection; Role of Communities in Stewardship Contracting Projects AGENCY: Forest Service, USDA. ACTION... revision of a currently approved information collection, Role of Communities in Stewardship Contracting...

  20. The ATLAS project: The effects of a constructionist digital laboratory project on undergraduate laboratory performance.

    PubMed

    Shoepe, Todd C; Cavedon, Dana K; Derian, Joseph M; Levy, Celine S; Morales, Amy

    2015-01-01

    Anatomical education is a dynamic field where developments in the implementation of constructive, situated-learning show promise in improving student achievement. The purpose of this study was to examine the effectiveness of an individualized, technology heavy project in promoting student performance in a combined anatomy and physiology laboratory course. Mixed-methods research was used to compare two cohorts of anatomy laboratories separated by the adoption of a new laboratory atlas project, which were defined as preceding (PRE) and following the adoption of the Anatomical Teaching and Learning Assessment Study (ATLAS; POST). The ATLAS project required the creation of a student-generated, photographic atlas via acquisition of specimen images taken with tablet technology and digital microscope cameras throughout the semester. Images were transferred to laptops, digitally labeled and photo edited weekly, and compiled into a digital book using Internet publishing freeware for final project submission. An analysis of covariance confirmed that student final examination scores were improved (P < 0.05) following the implementation of the laboratory atlas project (PRE, n = 75; POST, n = 90; means ± SE; 74.9 ± 0.9 versus 78.1 ± 0.8, respectively) after controlling for cumulative student grade point average. Analysis of questionnaires collected (n = 68) from the post group suggested students identified with atlas objectives, appreciated the comprehensive value in final examination preparation, and the constructionism involved, but recommended alterations in assignment logistics and the format of the final version. Constructionist, comprehensive term-projects utilizing student-preferred technologies could be used to improve performance toward student learning outcomes. © 2014 American Association of Anatomists.

  1. A Social Contract for University-Industry Collaboration: A Case of Project-Based Learning Environment

    NASA Astrophysics Data System (ADS)

    Vartiainen, Tero

    This study determines a social contract for a form of university-industry collaboration to a project-based learning environment in close collaboration with industry. The author's previous studies on moral conflicts in a project-based learning (PjBL) environment and his 5-year engagement in the PjBL environment are used as background knowledge, and John Rawls' veil of ignorance is used as a method in the contract formulation. Fair and impartial treatment of actors is strived for with the contract which constitutes of sets of obligations for each party, students, clients, and university (instructors) in the chosen project course. With the contract fair and impartial treatment of actors is strived for and the most dilemmatic moral conflicts are tried to be avoided. The forming of the social contract is evaluated, and implications for research and collaborations in practice are offered.

  2. Physics Laboratory Project Book, 1979-80.

    ERIC Educational Resources Information Center

    Connecticut State Dept. of Education, Hartford. Bureau of Vocational-Technical Schools.

    This Physics Laboratory Project Book, assembled through a survey of science instructors in vocational-technical schools in Connecticut, is an extension of the Chemistry-Materials Laboratory Project Book (see note) and is intended to meet a variety of needs. It can serve as an idea book, with the instructor taking from it as needed and adding or…

  3. Laboratory Manual, Electrical Engineering 25.

    ERIC Educational Resources Information Center

    Syracuse Univ., NY. Dept. of Electrical Engineering.

    Developed as part of a series of materials in the electrical engineering sequence developed under contract with the United States Office of Education, this laboratory manual provides nine laboratory projects suitable for a second course in electrical engineering. Dealing with resonant circuits, electrostatic fields, magnetic devices, and…

  4. A Study on Management of Contract Conditions of Yen Loan Projects in Philippine and Vietnam

    NASA Astrophysics Data System (ADS)

    Matsuba, Yasutaka; Ozawa, Kazumasa; Yasutani, Satoru

    FIDIC conditions of contract are used in many cases as general conditions for public works funded by Japanese yen loan, but there are cases where the particular conditions are written as to add some special clauses or change some clauses of FIDIC general conditions based on their own current contract conditions and customs, which will lead to restriction of rights and duties of the Engineer and Contractor. This paper focuses on yen loan projects in Philippine and Vietnam, and describes the actual contract management of FIDIC conditions of contract from the viewpoints such as: a) relationship between Client, Contractor and the Engineer b) claim for rights and contract managements. Based on interviews to parties concerned and literature reviews of public works concerned, contractor's rights are granted relatively wider in yen loan projects compared with locally-funded projects. However, it is also observed that the Engineer's rights are restricted by particular conditions, which is written in line with their own public procurement policies of both countries. Some discussions are added how these local procurement policies affect the implementation of FIDIC conditions of contract, and clarified what are the differences of contract management between both countries.

  5. EPA Contract Laboratory Program Statement of Work for Inorganic Superfund Methods Multi-Media, Multi-Concentration ISM02.3

    EPA Pesticide Factsheets

    This document contains analytical methods for the analysis of metals and cyanide in environmental samples. It also contains contractual requirements for laboratories participating in Superfund's Contract Laboratory Program.

  6. EPA Contract Laboratory Program Statement of Work for Inorganic Superfund Methods Multi-Media, Multi-Concentration ISM02.4

    EPA Pesticide Factsheets

    This document contains analytical methods for the analysis of metals and cyanide in environmental samples. It also contains contractual requirements for laboratories participating in Superfund's Contract Laboratory Program.

  7. SUNLAB - The Project of a Polish Underground Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kisiel, J.; Dorda, J.; Konefall, A.

    2010-11-24

    The project of the first Polish underground laboratory SUNLAB, in the Polkowice-Sieroszowice copper mine, belonging to the KGHM Polska Miedz S.A. holding, is presented. Two stages of the project are foreseen: SUNLAB1 (a small laboratory in the salt layer exhibiting extremely low level of natural radioactivity) and SUNLAB2 (a big laboratory in the anhydrite layer, able to host the next generation liquid argon detector - GLACIER, which is considered within the LAGUNA FP7 project). The results of the natural radioactivity background measurements performed in the Polkowice-Sieroszowice salt cavern are also briefly summarized.

  8. SUNLAB-The Project of a Polish Underground Laboratory

    NASA Astrophysics Data System (ADS)

    Kisiel, J.; Budzanowski, M.; Chorowski, M.; Cygan, S.; Dorda, J.; Hanzel, S.; Harańczyk, M.; Horoszczak, L.; Januszewska, K.; Jaroń, L.; Konefalł, A.; Kozak, K.; Lankof, L.; Mania, S.; Markiewicz, A.; Markowski, P.; Mazur, J.; Mertuszka, P.; Mietelski, J. W.; Poliński, J.; Puchalska, M.; Pytel, W.; Raczyński, M.; Sadecki, Z.; Sadowski, A.; Ślizowski, J.; Sulej, R.; Szarska, M.; Szeglowski, T.; Tomankiewicz, E.; Urbańczyk, K.; Zalewska, A.

    2010-11-01

    The project of the first Polish underground laboratory SUNLAB, in the Polkowice-Sieroszowice copper mine, belonging to the KGHM Polska Miedź S.A. holding, is presented. Two stages of the project are foreseen: SUNLAB1 (a small laboratory in the salt layer exhibiting extremely low level of natural radioactivity) and SUNLAB2 (a big laboratory in the anhydrite layer, able to host the next generation liquid argon detector-GLACIER, which is considered within the LAGUNA FP7 project). The results of the natural radioactivity background measurements performed in the Polkowice-Sieroszowice salt cavern are also briefly summarized.

  9. 46 CFR 159.010-15 - Contracting inspections and tests or transferrals to another laboratory or person.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Contracting inspections and tests or transferrals to another laboratory or person. 159.010-15 Section 159.010-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Independent Laboratory...

  10. 46 CFR 159.010-15 - Contracting inspections and tests or transferrals to another laboratory or person.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Contracting inspections and tests or transferrals to another laboratory or person. 159.010-15 Section 159.010-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Independent Laboratory...

  11. Air Force Research Laboratory

    DTIC Science & Technology

    2009-06-08

    Air Force Research Laboratory 8 June 2009 Mr. Leo Marple Ai F R h L b t r orce esearc a ora ory Leo.Marple@wpafb.af.mil DISTRIBUTION STATEMENT A...TITLE AND SUBTITLE Air Force Research Laboratory 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER...5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Air Force Research Laboratory ,Wright

  12. 78 FR 52005 - 30-Day Notice of Proposed Information Collection: Multifamily Project Construction Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... Construction Contract, Building Loan Agreement, & Construction Change Request AGENCY: Office of the Chief... Information Collection Title of Information Collection: Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change Request. OMB Approval Number: 2502-0011. Type of Request...

  13. Sandia, California Tritium Research Laboratory transition and reutilization project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garcia, T.B.

    1997-02-01

    This paper describes a project within Sandia National Laboratory to convert the shut down Tritium Research Laboratory into a facility which could be reused within the laboratory complex. In the process of decommissioning and decontaminating the facility, the laboratory was able to save substantial financial resources by transferring much existing equipment to other DOE facilities, and then expeditiously implementing a decontamination program which has resulted in the building being converted into laboratory space for new lab programs. This project of facility reuse has been a significant financial benefit to the laboratory.

  14. 75 FR 15453 - Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...

  15. Myoglobin Structure and Function: A Multiweek Biochemistry Laboratory Project

    ERIC Educational Resources Information Center

    Silverstein, Todd P.; Kirk, Sarah R.; Meyer, Scott C.; Holman, Karen L. McFarlane

    2015-01-01

    We have developed a multiweek laboratory project in which students isolate myoglobin and characterize its structure, function, and redox state. The important laboratory techniques covered in this project include size-exclusion chromatography, electrophoresis, spectrophotometric titration, and FTIR spectroscopy. Regarding protein structure,…

  16. Experiential learning in control systems laboratories and engineering project management

    NASA Astrophysics Data System (ADS)

    Reck, Rebecca Marie

    2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects

  17. Exploring protein structure and dynamics through a project-oriented biochemistry laboratory module.

    PubMed

    Lipchock, James M; Ginther, Patrick S; Douglas, Bonnie B; Bird, Kelly E; Patrick Loria, J

    2017-09-01

    Here, we present a 10-week project-oriented laboratory module designed to provide a course-based undergraduate research experience in biochemistry that emphasizes the importance of biomolecular structure and dynamics in enzyme function. This module explores the impact of mutagenesis on an important active site loop for a biomedically-relevant human enzyme, protein tyrosine phosphatase 1B (PTP1B). Over the course of the semester students guide their own mutant of PTP1B from conception to characterization in a cost-effective manner and gain exposure to fundamental techniques in biochemistry, including site-directed DNA mutagenesis, bacterial recombinant protein expression, affinity column purification, protein quantitation, SDS-PAGE, and enzyme kinetics. This project-based approach allows an instructor to simulate a research setting and prepare students for productive research beyond the classroom. Potential modifications to expand or contract this module are also provided. © 2017 by The International Union of Biochemistry and Molecular Biology, 45(5):403-410, 2017. © 2017 The International Union of Biochemistry and Molecular Biology.

  18. The Ames Project (1942-1946)

    ScienceCinema

    None

    2018-04-26

    The Ames Laboratory was officially founded on May 17, 1947, following development of a process to purify uranium metal for the historic Manhattan Project. From 1942 to 1946, Ames Lab scientists produced over two-million pounds of uranium metal. A U.S. Department of Energy national research laboratory, the Ames Laboratory creates materials and energy solutions. Iowa State University operates Ames Laboratory under contract with the DOE.

  19. Activities of the Jet Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Work accomplished by the Jet Propulsion Laboratory (JPL) under contract to NASA in 1985 is described. The work took place in the areas of flight projects, space science, geodynamics, materials science, advanced technology, defense and civil programs, telecommunications systems, and institutional activities.

  20. Analysis of Air Force Wartime Contracted Construction Project Performance

    DTIC Science & Technology

    2015-03-26

    Management, Volume 140. Branconi, C. v. & Loch, C. H., 2004. Contracting for major projects: eight business levers for top management. International ...Problems X Material Supply Problems X Poor Owner Management X X Poor Contractor Management X Corruption and Bribery X The USACE survey...Kremers, et al., 2010; GAO, 2014; Thibault, 2011). The final difference, corruption and bribery , was mentioned in the USACE study as well as by Kremers

  1. Myoglobin structure and function: A multiweek biochemistry laboratory project.

    PubMed

    Silverstein, Todd P; Kirk, Sarah R; Meyer, Scott C; Holman, Karen L McFarlane

    2015-01-01

    We have developed a multiweek laboratory project in which students isolate myoglobin and characterize its structure, function, and redox state. The important laboratory techniques covered in this project include size-exclusion chromatography, electrophoresis, spectrophotometric titration, and FTIR spectroscopy. Regarding protein structure, students work with computer modeling and visualization of myoglobin and its homologues, after which they spectroscopically characterize its thermal denaturation. Students also study protein function (ligand binding equilibrium) and are instructed on topics in data analysis (calibration curves, nonlinear vs. linear regression). This upper division biochemistry laboratory project is a challenging and rewarding one that not only exposes students to a wide variety of important biochemical laboratory techniques but also ties those techniques together to work with a single readily available and easily characterized protein, myoglobin. © 2015 International Union of Biochemistry and Molecular Biology.

  2. Egg Yolk Lecithin: A Biochemical Laboratory Project

    ERIC Educational Resources Information Center

    White, Bernard J.; And Others

    1974-01-01

    Describes an undergraduate laboratory project involving lecithin which integrates two general aspects of lipid methodology: chromatographic techniques and use of enzymes specificity to obtain structural information. (Author/SLH)

  3. Nanoscience and Technology at the Air Force Research Laboratory (AFRL)

    DTIC Science & Technology

    2005-05-01

    AIR FORCE RESEARCH LABORATORY ( AFRL ) Dr. Richard A. Vaia Dr. Daniel Miracle Dr. Thomas Cruse Air Force Research ...Technology At The Air Force Research Laboratory ( AFRL ) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT...98) Prescribed by ANSI Std Z39-18 AFRL NST Overview 2 AIR FORCE RESEARCH LABORATORY VISION We defend

  4. Nanoscience and Technology at the Air Force Research Laboratory (AFRL)

    DTIC Science & Technology

    2005-02-01

    AIR FORCE RESEARCH LABORATORY ( AFRL ) Dr. Richard A. Vaia Dr. Daniel Miracle Dr. Thomas Cruse Air Force Research ...Technology At The Air Force Research Laboratory ( AFRL ) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT...98) Prescribed by ANSI Std Z39-18 AFRL NST Overview 2 AIR FORCE RESEARCH LABORATORY VISION We defend

  5. 75 FR 30197 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... adopt the Naval Research Laboratory (NRL) Personnel Management Demonstration Project with modifications... Secretary of Defense (SECDEF) to conduct personnel management demonstration projects at DoD laboratories... execute a process and plan to employ the personnel management demonstration project authorities granted to...

  6. Notification: Controls Over Results Produced by EPA Independent Laboratories

    EPA Pesticide Factsheets

    Project #OPE-FY16-0022, April 5, 2016. The EPA OIG plans to begin preliminary research on controls that the EPA’s Office of Land and Emergency Management’s Contract Laboratory Program (CLP) has in place to detect or prevent fraud.

  7. Evaluation of contract time estimation and contracting procedures : technical summary.

    DOT National Transportation Integrated Search

    1996-08-01

    The objective of this research was 1) to provide the DOTD with a systematic approach to the determination of contract duration, and 2) to explore innovative contracting procedures that may prove beneficial in DOTD projects. The innovative contracting...

  8. Laboratory equipment maintenance contracts.

    PubMed

    Boudreau, D A; Scheer, W D; Catrou, P G

    1985-12-01

    The increasing level of technical sophistication and complexity found in clinical laboratory instrumentation today more than ever demands careful attention to maintenance service needs. The time-worn caution for careful definition of requirements for acquisition of a system should also carry over to acquisition of maintenance service. Guidelines are presented for specifications of terms and conditions for maintenance service from the perspective of the laboratorian in the automated clinical laboratory.

  9. The science of laboratory and project management in regulated bioanalysis.

    PubMed

    Unger, Steve; Lloyd, Thomas; Tan, Melvin; Hou, Jingguo; Wells, Edward

    2014-05-01

    Pharmaceutical drug development is a complex and lengthy process, requiring excellent project and laboratory management skills. Bioanalysis anchors drug safety and efficacy with systemic and site of action exposures. Development of scientific talent and a willingness to innovate or adopt new technology is essential. Taking unnecessary risks, however, should be avoided. Scientists must strategically assess all risks and find means to minimize or negate them. Laboratory Managers must keep abreast of ever-changing technology. Investments in instrumentation and laboratory design are critical catalysts to efficiency and safety. Matrix management requires regular communication between Project Managers and Laboratory Managers. When properly executed, it aligns the best resources at the right times for a successful outcome. Attention to detail is a critical aspect that separates excellent laboratories. Each assay is unique and requires attention in its development, validation and execution. Methods, training and facilities are the foundation of a bioanalytical laboratory.

  10. Project Laboratory for First-Year Students

    ERIC Educational Resources Information Center

    Planinsic, Gorazd

    2007-01-01

    This paper reports the modification of an existing experimental subject into a project laboratory for first-year physics students studying in the first cycle of university level and at a higher professional level. The subject is aimed at developing important science-related competences and skills through concrete steps under circumstances that are…

  11. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  12. USGS Blind Sample Project: monitoring and evaluating laboratory analytical quality

    USGS Publications Warehouse

    Ludtke, Amy S.; Woodworth, Mark T.

    1997-01-01

    The U.S. Geological Survey (USGS) collects and disseminates information about the Nation's water resources. Surface- and ground-water samples are collected and sent to USGS laboratories for chemical analyses. The laboratories identify and quantify the constituents in the water samples. Random and systematic errors occur during sample handling, chemical analysis, and data processing. Although all errors cannot be eliminated from measurements, the magnitude of their uncertainty can be estimated and tracked over time. Since 1981, the USGS has operated an independent, external, quality-assurance project called the Blind Sample Project (BSP). The purpose of the BSP is to monitor and evaluate the quality of laboratory analytical results through the use of double-blind quality-control (QC) samples. The information provided by the BSP assists the laboratories in detecting and correcting problems in the analytical procedures. The information also can aid laboratory users in estimating the extent that laboratory errors contribute to the overall errors in their environmental data.

  13. Laboratory Projects: Should Students Do Them or Design Them?

    ERIC Educational Resources Information Center

    Middelberg, Anton P. J.

    1995-01-01

    Describes changes initiated in the Level-Three laboratory course of the chemical engineering curriculum at the University of Adelaide that were useful in fostering higher-level skills and reducing the reliance on reports handed down from previous years. Highlights report writing and data analysis workshops and the laboratory project design…

  14. The Dynamics of Project-Based Learning Extension Courses: The "Laboratory of Social Projects" Case Study

    ERIC Educational Resources Information Center

    Arantes do Amaral, Joao Alberto

    2017-01-01

    In this case study we discuss the dynamics that drive a free-of-charge project-based learning extension course. We discuss the lessons learned in the course, "Laboratory of Social Projects." The course aimed to teach project management skills to the participants. It was conducted from August to November of 2015, at Federal University of…

  15. Office of Inspector General audit report on Project Hanford management contract costs and performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-11-01

    On August 6, 1996, the Richland Operations Office (Richland) awarded the Project Hanford Management Contract (Management Contract) to Fluor Daniel Hanford, Inc. (Fluor Daniel). This performance-based, 5-year contract to support cleanup of the Department of Energy`s (DOE) Hanford Site (Hanford) contained performance goals or expectations related to the stabilization, transition, and diversification of the Tri-Cities` economy near Hanford in southeastern Washington. One of these economic goals was that Fluor Daniel and its major subcontractors would help generate 3,000 new, non-Hanford, private sector jobs that would help stabilize and diversify the Tri-Cities` economy. The contract specifically called for Fluor Daniel tomore » help generate 200 jobs, establish an investment fund, and bring 6 new growth-oriented enterprise companies to the Tri-Cities by the end of Fiscal Year (FY) 1997. The objective of the audit was to determine whether Richland was making adequate progress in stabilizing and diversifying the economy of the Tri-Cities by creating 3,000 new, non-Hanford jobs within 5 years. Accordingly, the author examined the progress made in FY 1997, which was the first year of the Management Contract. Richland and Fluor Daniel are at risk of not meeting the Management Contract`s goals of stabilizing and diversifying the economy of the Tri-Cities because most of the new jobs created during FY 1997 were not comparable to Hanford jobs and, thus, may not sustain long-term economic goals. Therefore, Fluor Daniel has not met its expectations in the first year and is not making adequate progress toward meeting the Management Contract`s overall economic goals.« less

  16. A Semester-Long Project-Oriented Biochemistry Laboratory Based on "Helicobacter pylori" Urease

    ERIC Educational Resources Information Center

    Farnham, Kate R.; Dube, Danielle H.

    2015-01-01

    Here we present the development of a 13 week project-oriented biochemistry laboratory designed to introduce students to foundational biochemical techniques and then enable students to perform original research projects once they have mastered these techniques. In particular, we describe a semester-long laboratory that focuses on a biomedically…

  17. National Storage Laboratory: a collaborative research project

    NASA Astrophysics Data System (ADS)

    Coyne, Robert A.; Hulen, Harry; Watson, Richard W.

    1993-01-01

    The grand challenges of science and industry that are driving computing and communications have created corresponding challenges in information storage and retrieval. An industry-led collaborative project has been organized to investigate technology for storage systems that will be the future repositories of national information assets. Industry participants are IBM Federal Systems Company, Ampex Recording Systems Corporation, General Atomics DISCOS Division, IBM ADSTAR, Maximum Strategy Corporation, Network Systems Corporation, and Zitel Corporation. Industry members of the collaborative project are funding their own participation. Lawrence Livermore National Laboratory through its National Energy Research Supercomputer Center (NERSC) will participate in the project as the operational site and provider of applications. The expected result is the creation of a National Storage Laboratory to serve as a prototype and demonstration facility. It is expected that this prototype will represent a significant advance in the technology for distributed storage systems capable of handling gigabyte-class files at gigabit-per-second data rates. Specifically, the collaboration expects to make significant advances in hardware, software, and systems technology in four areas of need, (1) network-attached high performance storage; (2) multiple, dynamic, distributed storage hierarchies; (3) layered access to storage system services; and (4) storage system management.

  18. 75 FR 53075 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... Demonstration Project, Department of the Air Force, Air Force Research Laboratory (AFRL); Notice #0;#0;Federal... Project, Department of the Air Force, Air Force Research Laboratory (AFRL) AGENCY: Office of the Deputy... amendment changed the amount of time required to be assessed under CCS from 180 to 90 calendar days and was...

  19. SHynergie: Development of a virtual project laboratory for monitoring hydraulic stimulations

    NASA Astrophysics Data System (ADS)

    Renner, Jörg; Friederich, Wolfgang; Meschke, Günther; Müller, Thomas; Steeb, Holger

    2016-04-01

    Hydraulic stimulations are the primary means of developing subsurface reservoirs regarding the extent of fluid transport in them. The associated creation or conditioning of a system of hydraulic conduits involves a range of hydraulic and mechanical processes but also chemical reactions, such as dissolution and precipitation, may affect the stimulation result on time scales as short as hours. In the light of the extent and complexity of these processes, the steering potential for the operator of a stimulation critically depends on the ability to integrate the maximum amount of site-specific information with profound process understanding and a large spectrum of experience. We report on the development of a virtual project laboratory for monitoring hydraulic stimulations within the project SHynergie (http://www.ruhr-uni-bochum.de/shynergie/). The concept of the laboratory envisioned product that constitutes a preparing and accompanying rather than post-processing instrument ultimately accessible to persons responsible for a project over a web-repository. The virtual laboratory consists of a data base, a toolbox, and a model-building environment. Entries in the data base are of two categories. On the one hand, selected mineral and rock properties are provided from the literature. On the other hand, project-specific entries of any format can be made that are assigned attributes regarding their use in a stimulation problem at hand. The toolbox is interactive and allows the user to perform calculations of effective properties and simulations of different types (e.g., wave propagation in a reservoir, hydraulic test). The model component is also hybrid. The laboratory provides a library of models reflecting a range of scenarios but also allows the user to develop a site-specific model constituting the basis for simulations. The laboratory offers the option to use its components following the typical workflow of a stimulation project. The toolbox incorporates simulation

  20. Overview of DOE Oil and Gas Field Laboratory Projects

    NASA Astrophysics Data System (ADS)

    Bromhal, G.; Ciferno, J.; Covatch, G.; Folio, E.; Melchert, E.; Ogunsola, O.; Renk, J., III; Vagnetti, R.

    2017-12-01

    America's abundant unconventional oil and natural gas (UOG) resources are critical components of our nation's energy portfolio. These resources need to be prudently developed to derive maximum benefits. In spite of the long history of hydraulic fracturing, the optimal number of fracturing stages during multi-stage fracture stimulation in horizontal wells is not known. In addition, there is the dire need of a comprehensive understanding of ways to improve the recovery of shale gas with little or no impacts on the environment. Research that seeks to expand our view of effective and environmentally sustainable ways to develop our nation's oil and natural gas resources can be done in the laboratory or at a computer; but, some experiments must be performed in a field setting. The Department of Energy (DOE) Field Lab Observatory projects are designed to address those research questions that must be studied in the field. The Department of Energy (DOE) is developing a suite of "field laboratory" test sites to carry out collaborative research that will help find ways of improving the recovery of energy resources as much as possible, with as little environmental impact as possible, from "unconventional" formations, such as shale and other low permeability rock formations. Currently there are three field laboratories in various stages of development and operation. Work is on-going at two of the sites: The Hydraulic Fracturing Test Site (HFTS) in the Permian Basin and the Marcellus Shale Energy and Environmental Lab (MSEEL) project in the Marcellus Shale Play. Agreement on the third site, the Utica Shale Energy and Environmental Lab (USEEL) project in the Utica Shale Play, was just recently finalized. Other field site opportunities may be forthcoming. This presentation will give an overview of the three field laboratory projects.

  1. Tale of a Performance Contract

    ERIC Educational Resources Information Center

    Berson, Minnie Perrin

    1971-01-01

    Excerpts from Texarkana and Gary: A Tale of Two Performance Contracts," Childhood Education Magazine, March 1971; reports on observations made during visit to Gary, Indiana, school under contract to Behavioral Research Laboratories. (RT)

  2. Dental Laboratory Technology. Project Report Phase I with Research Findings.

    ERIC Educational Resources Information Center

    Sappe', Hoyt; Smith, Debra S.

    This report provides results of Phase I of a project that researched the occupational area of dental laboratory technology, established appropriate committees, and conducted task verification. These results are intended to guide development of a program designed to train dental laboratory technicians. Section 1 contains general information:…

  3. Chemistry-Materials Laboratory Project Book, 1979-80.

    ERIC Educational Resources Information Center

    Connecticut State Dept. of Education, Hartford. Bureau of Vocational-Technical Schools.

    This Chemistry-Materials Laboratory Project Book, assembled through a survey of science instructors in vocational-technical schools in Connecticut, is intended to meet a variety of needs. It can serve as an idea book, with the instructor taking from it as needed and adding or substituting material related to class interests; as a guide book for…

  4. Project development laboratories energy fuels and oils based on NRU “MPEI”

    NASA Astrophysics Data System (ADS)

    Burakov, I. A.; Burakov, A. Y.; Nikitina, I. S.; Khomenkov, A. M.; Paramonova, A. O.; Khtoo Naing, Aung

    2017-11-01

    In the process of improving the efficiency of power plants a hot topic is the use of high-quality fuels and lubricants. In the process of transportation, preparation for use, storage and maintenance of the properties of fuels and lubricants may deteriorate, which entails a reduction in the efficiency of power plants. One of the ways to prevent the deterioration of the properties is a timely analysis of the relevant laboratories. In this day, the existence of laboratories of energy fuels and energy laboratory oil at thermal power stations is satisfactory character. However, the training of qualified personnel to work in these laboratories is a serious problem, as the lack of opportunities in these laboratories a complete list of required tests. The solution to this problem is to explore the possibility of application of methods of analysis of the properties of fuels and lubricants in the stage of training and re-training of qualified personnel. In this regard, on the basis of MPEI developed laboratory projects of solid, liquid and gaseous fuels, power and energy oils and lubricants. Projects allow for a complete list of tests required for the timely control of properties and prevent the deterioration of these properties. Assess the financial component of the implementation of the developed projects based on the use of modern equipment used for tests. Projects allow for a complete list of tests required for the timely control of properties and prevent the deterioration of these properties.

  5. KAHVE Laboratory RF circulator and transmission line project

    NASA Astrophysics Data System (ADS)

    Cetinkaya, Hakan; ćaǧlar, Aslıhan; ćiçek, Cihan; Özbey, Aydın; Sunar, Ezgi; Türemen, Görkem; Yıldız, Hüseyin; Yüncü, Alperen; Özcan, Erkcan; Ünel, Gökhan; Yaman, Fatih

    2018-02-01

    An 800 MHz RF circulator and transmission line project has recently started at the newly commissioned Kandilli Detector, Accelerator and Instrumentation (KAHVE) Laboratory at the Boğaziçi University. The aims are to design, build and construct an RF circulator and transmission line in Turkey for high power and high frequency applications. The project consists of 8 transmission line elements: 800 MHz RF generator with 60 kW power (klystron), klystron to waveguide converter, waveguides, E and H bends, 3-port circulator and waveguide to coaxial converter to transmit RF power to a pillbox RF cavity. Design studies and details of the ongoing project will be presented.

  6. 24 CFR 891.705 - Project assistance contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... for an assisted unit (or residential space in a group home) that is leased to an eligible family is equal to the difference between the contract rent for the unit (or pro rata share of the contract rent in a group home) and the tenant rent payable by the family. (2) Payments to the Borrower for vacant...

  7. Solar buildings program contract summary, calendar year 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2000-06-07

    The mission of the US Department of Energy's Solar Buildings Program is to advance the development and widespread deployment of competitive solar thermal technologies for use in buildings. The long-term goal of the Program is to combine solar energy technologies with energy-efficient construction techniques and create cost-effective buildings that have a zero net need for fossil fuel energy on an annual basis. The Solar Buildings Program conducts research and development on solar technologies that can deliver heat, light, and hot water to residential and commercial buildings. By working closely with manufacturers in both the buildings and solar energy industries andmore » by supporting research at universities and national laboratories, the Solar Buildings Program brings together the diverse players developing reliable and affordable solar technologies for building applications. The National Renewable Energy Laboratory (NREL) in Golden, Colorado, and Sandia National Laboratories (SNL) in Albuquerque, New Mexico, jointly participate in the Solar Buildings Program. These two national laboratories work closely with industry researching new concepts, developing technology improvements, reducing manufacturing costs, monitoring system performance, promoting quality assurance, and identifying potential new markets. In calendar year 1999, the Solar Buildings Program focused primarily on solar hot water system research and development (R and D), US industry manufacturing assistance, and US market assistance. The Program also completed a number of other projects that were begun in earlier years. This Contract Summary describes the Program's contracted activities that were active during 1999.« less

  8. Expanding Energy Performance Contracting in china: policy solutions and market mechanisms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shen, Bo; Price, Lynn; Liu, Xu

    Energy performance contracting is an important market mechanism that uses energy savings to pay over time for the upfront costs of energy efficiency retrofits in buildings, industries, and other types of facilities. Through energy performance contracts (EPCs), Energy Service Companies (ESCOs) play an important role in implementing energy efficiency retrofits. Both China and the United States have large markets for EPCs and significant opportunities for growth. The Chinese government has made great efforts in promoting the country’s ESCO business and expanding its EPC markets. This paper makes a series of recommendations for China to adopt more ambitious policy measures tomore » encourage deep energy savings projects via EPCs. These recommendations are built on initial insights from a white paper developed by researchers at the Pacific Northwest National Laboratory and the Lawrence Berkeley National Laboratory with the assistance from the ESCO Committee of China’s Energy Conservation Association (EMCA). Key recommendations are listed below.« less

  9. Contingency Contracting Customer Guide

    DTIC Science & Technology

    1996-12-01

    I CONTINGENCY CONTRACTING CUSTOMER GUIDE PROJECT NUMBER: LC9619100 PROJECT MANAGER: CAPT TOM SNYDER TEAM MEMBERS MAJ JOHN PERRY CAPT ROBBIN VAUGHN...Report 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Contracting Deployment Customer Guide 6. AUTHOR(S) Capt.Thomas J. Snyder, AFLMA/LGC, DSN 596-4085 7...individual customers on the process, the customer support guide provides the necessary explanations without straining valuable manpower resources. The

  10. U.S. Geological Survey Standard Reference Sample Project: Performance Evaluation of Analytical Laboratories

    USGS Publications Warehouse

    Long, H. Keith; Daddow, Richard L.; Farrar, Jerry W.

    1998-01-01

    Since 1962, the U.S. Geological Survey (USGS) has operated the Standard Reference Sample Project to evaluate the performance of USGS, cooperator, and contractor analytical laboratories that analyze chemical constituents of environmental samples. The laboratories are evaluated by using performance evaluation samples, called Standard Reference Samples (SRSs). SRSs are submitted to laboratories semi-annually for round-robin laboratory performance comparison purposes. Currently, approximately 100 laboratories are evaluated for their analytical performance on six SRSs for inorganic and nutrient constituents. As part of the SRS Project, a surplus of homogeneous, stable SRSs is maintained for purchase by USGS offices and participating laboratories for use in continuing quality-assurance and quality-control activities. Statistical evaluation of the laboratories results provides information to compare the analytical performance of the laboratories and to determine possible analytical deficiences and problems. SRS results also provide information on the bias and variability of different analytical methods used in the SRS analyses.

  11. Childhood as a Resource and Laboratory for the Self-Project

    ERIC Educational Resources Information Center

    Buhler-Niederberger, Doris; Konig, Alexandra

    2011-01-01

    The biographies of individuals in today's societies are characterized by the need to exert effort and make decisions in planning one's life course. A "self-project" has to be worked out both retrospectively and prospectively; childhood becomes important as a resource and a laboratory for the self-project. This empirical study analyses how the…

  12. Implementation of a Project-Based Molecular Biology Laboratory Emphasizing Protein Structure-Function Relationships in a Large Introductory Biology Laboratory Course

    ERIC Educational Resources Information Center

    Treacy, Daniel J.; Sankaran, Saumya M.; Gordon-Messer, Susannah; Saly, Danielle; Miller, Rebecca; Isaac, R. Stefan; Kosinski-Collins, Melissa S.

    2011-01-01

    In introductory laboratory courses, many universities are turning from traditional laboratories with predictable outcomes to inquiry-inspired, project-based laboratory curricula. In these labs, students are allowed to design at least some portion of their own experiment and interpret new, undiscovered data. We have redesigned the introductory…

  13. 24 CFR 891.560 - HAP contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  14. Strategies and Lessons-Learned for the Successful Alignment of Contract Cost with the Contract Budget Base (CBB) within the First Year of Contract Award - 13154

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mullis, Jay; Rueter, Ken

    2013-07-01

    In order to provide a sound basis and foundation for integrated Project and Contract change management, it is imperative to ensure the alignment of the Negotiated Contract Costs (NCC) with the Contract Budget Base (CBB), where CBB is defined as the Performance Measurement Baseline (PMB) plus Management Reserve (MR). The achievement of this alignment assures customer and contractor agreement on scope, requirements, quantities, schedule and cost, which facilitates the identification of change conditions and ultimate agreement on the value of changes to the NCC and the CBB. Delays in contract/CBB true up/reconciliation can negatively effect measurement of project progress, limitingmore » owner understanding of liability, and may result in increased contract disagreements and potential claims. The Department of Energy Oak Ridge Office of Environmental Management (OR-EM) and URS - CH2M Oak Ridge LLC (UCOR) achieved alignment of the NCC with the CBB within 10 months of UCOR taking over work on the East Tennessee Technology Park (ETTP) cleanup contract by: 1. Managing as a discrete project; 2. Establishing expectations and setting tone of interactions; 3. Using personnel experienced with Federal Acquisition Regulation (FAR); 4. Partnering; 5. Establishing ombudsmen. (authors)« less

  15. Turbine Research Program Cold Weather Turbine Project: Period of Performance May 27, 1999 -- March 31, 2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, J.; Bywaters, G.; Costin, D.

    2004-08-01

    Northern Power Systems completed the Cold Weather Turbine (CWT) project, which was funded by the National Renewable Energy Laboratory (NREL), under subcontract XAT-9-29200-01. The project's primary goal is to develop a 100-kW wind turbine suited for deployment in remote villages in cold regions. The contract required testing and certification of the turbine to the International Electrotechnical Commission (IEC) 61400-1 international standard through Underwriters Laboratories (UL). The contract also required Northern Power Systems to study design considerations for operation in extreme cold (-80F at the South Pole, for example). The design was based on the successful proof of concept (POC) turbinemore » (developed under NREL and NASA contracts), considered the prototype turbine that would be refined and manufactured to serve villages in cold regions around the world.« less

  16. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  17. Implementing a Student-Designed Green Chemistry Laboratory Project in Organic Chemistry

    ERIC Educational Resources Information Center

    Graham, Kate J.; Jones, T. Nicholas; Schaller, Chris P.; McIntee, Edward J.

    2014-01-01

    A multiweek organic chemistry laboratory project is described that emphasizes sustainable practices in experimental design. An emphasis on student-driven development of the project is meant to mirror the independent nature of research. Students propose environmentally friendly modifications of several reactions. With instructor feedback, students…

  18. 24 CFR 880.502 - Term of contract.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Contract § 880.502 Term of contract. (a) Term (except for Manufactured Home Parks). The term of the contract will be as follows: (1) For assisted units in a project financed with the aid of a loan insured or... Federal government, the term will be 20 years. (2) For assisted units in a project financed other than as...

  19. 24 CFR 880.502 - Term of contract.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Contract § 880.502 Term of contract. (a) Term (except for Manufactured Home Parks). The term of the contract will be as follows: (1) For assisted units in a project financed with the aid of a loan insured or... Federal government, the term will be 20 years. (2) For assisted units in a project financed other than as...

  20. 24 CFR 880.502 - Term of contract.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Contract § 880.502 Term of contract. (a) Term (except for Manufactured Home Parks). The term of the contract will be as follows: (1) For assisted units in a project financed with the aid of a loan insured or... Federal government, the term will be 20 years. (2) For assisted units in a project financed other than as...

  1. 24 CFR 880.502 - Term of contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Contract § 880.502 Term of contract. (a) Term (except for Manufactured Home Parks). The term of the contract will be as follows: (1) For assisted units in a project financed with the aid of a loan insured or... Federal government, the term will be 20 years. (2) For assisted units in a project financed other than as...

  2. 24 CFR 880.502 - Term of contract.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Contract § 880.502 Term of contract. (a) Term (except for Manufactured Home Parks). The term of the contract will be as follows: (1) For assisted units in a project financed with the aid of a loan insured or... Federal government, the term will be 20 years. (2) For assisted units in a project financed other than as...

  3. Static Verification for Code Contracts

    NASA Astrophysics Data System (ADS)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  4. Sediment laboratory quality-assurance project: studies of methods and materials

    USGS Publications Warehouse

    Gordon, J.D.; Newland, C.A.; Gray, J.R.

    2001-01-01

    In August 1996 the U.S. Geological Survey initiated the Sediment Laboratory Quality-Assurance project. The Sediment Laboratory Quality Assurance project is part of the National Sediment Laboratory Quality-Assurance program. This paper addresses the fmdings of the sand/fme separation analysis completed for the single-blind reference sediment-sample project and differences in reported results between two different analytical procedures. From the results it is evident that an incomplete separation of fme- and sand-size material commonly occurs resulting in the classification of some of the fme-size material as sand-size material. Electron microscopy analysis supported the hypothesis that the negative bias for fme-size material and the positive bias for sand-size material is largely due to aggregation of some of the fine-size material into sand-size particles and adherence of fine-size material to the sand-size grains. Electron microscopy analysis showed that preserved river water, which was low in dissolved solids, specific conductance, and neutral pH, showed less aggregation and adhesion than preserved river water that was higher in dissolved solids and specific conductance with a basic pH. Bacteria were also found growing in the matrix, which may enhance fme-size material aggregation through their adhesive properties. Differences between sediment-analysis methods were also investigated as pan of this study. Suspended-sediment concentration results obtained from one participating laboratory that used a total-suspended solids (TSS) method had greater variability and larger negative biases than results obtained when this laboratory used a suspended-sediment concentration method. When TSS methods were used to analyze the reference samples, the median suspended sediment concentration percent difference was -18.04 percent. When the laboratory used a suspended-sediment concentration method, the median suspended-sediment concentration percent difference was -2

  5. 24 CFR 880.505 - Contract administration and conversions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... conversions. 880.505 Section 880.505 Housing and Urban Development Regulations Relating to Housing and Urban... Housing Assistance Payments Contract § 880.505 Contract administration and conversions. (a) Contract... finances the project. (c) Conversion of Projects from one Ownership/Contractual arrangement to another. Any...

  6. 24 CFR 880.505 - Contract administration and conversions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... conversions. 880.505 Section 880.505 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN... Housing Assistance Payments Contract § 880.505 Contract administration and conversions. (a) Contract... finances the project. (c) Conversion of Projects from one Ownership/Contractual arrangement to another. Any...

  7. Multiweek Cell Culture Project for Use in Upper-Level Biology Laboratories

    ERIC Educational Resources Information Center

    Marion, Rebecca E.; Gardner, Grant E.; Parks, Lisa D.

    2012-01-01

    This article describes a laboratory protocol for a multiweek project piloted in a new upper-level biology laboratory (BIO 426) using cell culture techniques. Human embryonic kidney-293 cells were used, and several culture media and supplements were identified for students to design their own experiments. Treatments included amino acids, EGF,…

  8. Motivational project-based laboratory for a common first year electrical engineering course

    NASA Astrophysics Data System (ADS)

    Nedic, Zorica; Nafalski, Andrew; Machotka, Jan

    2010-08-01

    Over the past few years many universities worldwide have introduced a common first year for all engineering disciplines. This is despite the opinion of many academics that large classes have negative effects on the learning outcomes of first year students. The University of South Australia is also faced with low motivation amongst engineering students studying non-major courses. In 2006, a project-based laboratory was successfully introduced for first year students enrolled in electrical disciplines, which increased student satisfaction, reduced the attrition rate and improved students' success rate. This paper presents the experiences with the project-based laboratory's implementation in three different projects in the common first year course, Electrical and Energy Systems, where each project aims to increase the motivation of students in one of three disciplines: electrical, mechanical or civil engineering.

  9. 48 CFR 212.7002-1 - Contracts under the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002-1 Contracts under the program. (a) The contracting officer may use FAR part 12 procedures to award a contract for an... process begun as a prototype project under an other transaction agreement or as a research project carried...

  10. 24 CFR 983.203 - HAP contract information.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract information. 983.203... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.203 HAP contract information. The HAP contract must specify: (a) The total number of contract units by number of bedrooms; (b...

  11. Making a Natural Product Chemistry Course Meaningful with a Mini Project Laboratory

    ERIC Educational Resources Information Center

    Hakim, Aliefman; Liliasari; Kadarohman, Asep; Syah, Yana Maolana

    2016-01-01

    This paper discusses laboratory activities that can improve the meaningfulness of natural product chemistry course. These laboratory activities can be useful for students from many different disciplines including chemistry, pharmacy, and medicine. Students at the third-year undergraduate level of chemistry education undertake the project to…

  12. Using Independent Research Projects to Foster Learning in the Comparative Vertebrate Anatomy Laboratory

    ERIC Educational Resources Information Center

    Ghedotti, Michael J.; Fielitz, Christopher; Leonard, Daniel J.

    2005-01-01

    This paper presents a teaching methodology involving an independent research project component for use in undergraduate Comparative Vertebrate Anatomy laboratory courses. The proposed project introduces cooperative, active learning in a research context to comparative vertebrate anatomy. This project involves pairs or groups of three students…

  13. 75 FR 55109 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ...Section 342(b) of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 1995, Public Law 103-337, (10 U.S.C. 2358 note), as amended by section 1109 of NDAA for FY 2000, Public Law 106- 65, and section 1114 of NDAA for FY 2001, Public Law 106-398, authorizes the Secretary of Defense to conduct personnel demonstration projects at DoD laboratories designated as Science and Technology Reinvention Laboratories (STRLs). The above-cited legislation authorizes DoD to conduct demonstration projects to determine whether a specified change in personnel management policies or procedures would result in improved Federal personnel management. Section 1105 of the NDAA for FY 2010, Public Law 111-84, 123 Stat. 2486, October 28, 2009, designates additional DoD laboratories as STRLs for the purpose of designing and implementing personnel management demonstration projects for conversion of employees from the personnel system which applied on October 28, 2009. The TARDEC is listed in subsection 1105(a) of NDAA for FY 2010 as one of the newly designated STRLs.

  14. 76 FR 12507 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-07

    ...Section 342(b) of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 1995, Public Law (Pub. L.) 103-337, (10 U.S.C. 2358 note), as amended by section 1109 of NDAA for FY 2000, Public Law 106-65, and section 1114 of NDAA for FY 2001, Public Law 106-398, authorizes the Secretary of Defense to conduct personnel demonstration projects at DoD laboratories designated as Science and Technology Reinvention Laboratories (STRLs). The above-cited legislation authorizes DoD to conduct demonstration projects to determine whether a specified change in personnel management policies or procedures would result in improved Federal personnel management. Section 1105 of the NDAA for FY 2010, Public Law 111-84, 123 Stat. 2486, October 28, 2009, designates additional DoD laboratories as STRLs for the purpose of designing and implementing personnel management demonstration projects for conversion of employees from the personnel system which applied on October 28, 2009. The TARDEC is listed in subsection 1105(a) of NDAA for FY 2010 as one of the newly designated STRLs.

  15. A Project To Make the Laboratory More Accessible to Students with Disabilities

    NASA Astrophysics Data System (ADS)

    Lunsford, Suzanne K.; Bargerhuff, Mary Ellen

    2006-03-01

    This article describes project CLASS (Creating Laboratory Access for Science Students) an innovative NSF-funded project originating at Wright State University in Dayton, Ohio. Project CLASS enables students to participate in chemistry labs regardless of physical or learning disabilities in grades 7 12. This nationally recognized project prepares educators to accommodate and develop adaptive lab equipment to meet the needs of students with physical and learning disabilities while maintaining the integrity of the science curriculum.

  16. Use of a Laboratory Field Project in an Introductory Crop Science Course.

    ERIC Educational Resources Information Center

    Lane, Robert A.

    1986-01-01

    Assesses the benefits resulting from a laboratory field project and report for agricultural students in an introductory crop science course. Student responses to evaluation statements indicated that the project helped them identify crops, understand cultural and management practices, and recognize environmental influences that affect crop…

  17. ALMA On the Move - ESO Awards Important Contract for the ALMA Project

    NASA Astrophysics Data System (ADS)

    2005-12-01

    Only two weeks after awarding its largest-ever contract for the procurement of antennas for the Atacama Large Millimeter Array project (ALMA), ESO has signed a contract with Scheuerle Fahrzeugfabrik GmbH, a world-leader in the design and production of custom-built heavy-duty transporters, for the provision of two antenna transporting vehicles. These vehicles are of crucial importance for ALMA. ESO PR Photo 41a/05 ESO PR Photo 41a/05 The ALMA Transporter (Artist's Impression) [Preview - JPEG: 400 x 756 pix - 234k] [Normal - JPEG: 800 x 1512 pix - 700k] [Full Res - JPEG: 1768 x 3265 pix - 2.3M] Caption: Each of the ALMA transporters will be 10 m wide, 4.5 m high and 16 m long. "The timely awarding of this contract is most important to ensure that science operations can commence as planned," said ESO Director General Catherine Cesarsky. "This contract thus marks a further step towards the realization of the ALMA project." "These vehicles will operate in a most unusual environment and must live up to very strict demands regarding performance, reliability and safety. Meeting these requirements is a challenge for us, and we are proud to have been selected by ESO for this task," commented Hans-Jörg Habernegg, President of Scheuerle GmbH. ESO PR Photo 41b/05 ESO PR Photo 41b/05 Signing the Contract [Preview - JPEG: 400 x 572 pix - 234k] [Normal - JPEG: 800 x 1143 pix - 700k] [HiRes - JPEG: 4368 x 3056 pix - 2.3M] Caption: (left to right) Mr Thomas Riek, Vice-President of Scheuerle GmbH, Dr Catherine Cesarsky, ESO Director General and Mr Hans-Jörg Habernegg, President of Scheuerle GmbH. When completed on the high-altitude Chajnantor site in Chile, ALMA is expected to comprise more than 60 antennas, which can be placed in different locations on the plateau but which work together as one giant telescope. Changing the relative positions of the antennas and thus also the configuration of the array allows for different observing modes, comparable to using a zoom lens, offering

  18. The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract

    NASA Astrophysics Data System (ADS)

    Suhaida, S. K.; Wong, Z. D.

    2017-11-01

    Time is equal to money; and it is applies in the construction industry where time is very important. Most of the standard form of contracts provide contractual clauses to ascertain time and money related to the scenarios while Extension of Time (EOT) is one of them. Under circumstance and delays, contractor is allow to apply EOT in order to complete the works on a later completion date without Liquidated Damages (LD) imposed to the claimant. However, both claimants and assessors encountered problems in assessing the EOT. The aim of this research is to recommend the usage of Microsoft Project as a tool in assessing EOT associated with the standard form of contract, PAM 2006. A quantitative method is applied towards the respondents that consisted of architects and quantity surveyors (QS) in order to collect data on challenges in assessing EOT claims and the effectiveness of Microsoft Project as a tool. The finding of this research highlighted that Microsoft Project can serve as a basis to perform EOT tasks as this software can be used as a data bank to store handy information which crucial for preparing and evaluating EOT.

  19. 48 CFR 927.303 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... is a domestic small business or nonprofit organization as defined at (FAR) 48 CFR 27.301, except... contracts for the management and operation of DOE laboratories and production facilities. (b) DOE shall not... its rights in an identified invention pursuant to 10 CFR part 784, contracting officers shall consult...

  20. A Project-Based Laboratory for Learning Embedded System Design with Industry Support

    ERIC Educational Resources Information Center

    Lee, Chyi-Shyong; Su, Juing-Huei; Lin, Kuo-En; Chang, Jia-Hao; Lin, Gu-Hong

    2010-01-01

    A project-based laboratory for learning embedded system design with support from industry is presented in this paper. The aim of this laboratory is to motivate students to learn the building blocks of embedded systems and practical control algorithms by constructing a line-following robot using the quadratic interpolation technique to predict the…

  1. Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.

  2. Students' Perceptions of a Project-Based Organic Chemistry Laboratory Environment: A Phenomenographic Approach

    ERIC Educational Resources Information Center

    Burrows, Nikita L.; Nowak, Montana K.; Mooring, Suazette R.

    2017-01-01

    Students can perceive the laboratory environment in a variety of ways that can affect what they take away from the laboratory course. This qualitative study characterizes undergraduate students' perspectives of a project-based Organic Chemistry laboratory using the theoretical framework of phenomenography. Eighteen participants were interviewed in…

  3. A Transition from a Traditional to a Project-Like Physical Chemistry Laboratory via a Heterogeneous Catalysis Study.

    ERIC Educational Resources Information Center

    Goldwasser, M. R.; Leal, O.

    1979-01-01

    Outlines an approach for instruction in a physical chemistry laboratory which combines traditional and project-like experiments. An outline of laboratory experiments and examples of project-like experiments are included. (BT)

  4. Guidelines for Contracting Microfilming Services.

    ERIC Educational Resources Information Center

    Byrne, Sherry

    1986-01-01

    Outlines the process involved in selecting an outside filming agent for the purpose of preserving a library's or archive's holdings. Guidelines include project planning, selecting a filming agent, and contract preparation and maintenance. A sample contract is included. (Author/EM)

  5. An Analysis of Laboratory Activities in Two Modern Science Curricula: Project Physics and PSSC.

    ERIC Educational Resources Information Center

    Lunetta, Vincent N.; Tamir, Pinchas

    In evaluating whether the laboratory guides for Project Physics and for PSSC are consistent with the goals of their designers in demonstrating the interplay between experiment and theory in the development of physics, a system was developed for analyzing physics laboratory investigations, and the laboratory activities in the "PSSC Physics…

  6. Renewable Energy Contract Development Best Practices

    EPA Pesticide Factsheets

    The Toolbox for Renewable Energy Project Development's Renewable Energy Contract Development Best Practices page provides an overview of the Request for Proposal (RFP) process as well as resources, such as contract templates.

  7. A Semester-Long Project-Oriented Biochemistry Laboratory Based on Helicobacter pylori Urease

    PubMed Central

    Farnham, Kate R.; Dube, Danielle H.

    2015-01-01

    Here we present the development of a thirteen-week project-oriented biochemistry laboratory designed to introduce students to foundational biochemical techniques and then enable students to perform original research projects once they have mastered these techniques. In particular, we describe a semester-long laboratory that focuses on a biomedically relevant enzyme – Helicobacter pylori (Hp) urease – the activity of which is absolutely required for the gastric pathogen Hp to colonize the human stomach. Over the course of the semester, students undertake a biochemical purification of Hp urease, assess the success of their purification, and investigate the activity of their purified enzyme. In the final weeks of the semester, students design and implement their own experiments to study Hp urease. This laboratory provides students with an understanding of the importance of biochemistry in human health while empowering them to engage in an active area of research. PMID:26173574

  8. Arctic Energy Technology Development Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sukumar Bandopadhyay; Charles Chamberlin; Robert Chaney

    2008-12-31

    The Arctic Energy Technology Development Laboratory was created by the University of Alaska Fairbanks in response to a congressionally mandated funding opportunity through the U.S. Department of Energy (DOE), specifically to encourage research partnerships between the university, the Alaskan energy industry, and the DOE. The enabling legislation permitted research in a broad variety of topics particularly of interest to Alaska, including providing more efficient and economical electrical power generation in rural villages, as well as research in coal, oil, and gas. The contract was managed as a cooperative research agreement, with active project monitoring and management from the DOE. Inmore » the eight years of this partnership, approximately 30 projects were funded and completed. These projects, which were selected using an industry panel of Alaskan energy industry engineers and managers, cover a wide range of topics, such as diesel engine efficiency, fuel cells, coal combustion, methane gas hydrates, heavy oil recovery, and water issues associated with ice road construction in the oil fields of the North Slope. Each project was managed as a separate DOE contract, and the final technical report for each completed project is included with this final report. The intent of this process was to address the energy research needs of Alaska and to develop research capability at the university. As such, the intent from the beginning of this process was to encourage development of partnerships and skills that would permit a transition to direct competitive funding opportunities managed from funding sources. This project has succeeded at both the individual project level and at the institutional development level, as many of the researchers at the university are currently submitting proposals to funding agencies, with some success.« less

  9. ESO Signs Largest-Ever European Industrial Contract For Ground-Based Astronomy Project ALMA

    NASA Astrophysics Data System (ADS)

    2005-12-01

    ESO, the European Organisation for Astronomical Research in the Southern Hemisphere, announced today that it has signed a contract with the consortium led by Alcatel Alenia Space and composed also of European Industrial Engineering (Italy) and MT Aerospace (Germany), to supply 25 antennas for the Atacama Large Millimeter Array (ALMA) project, along with an option for another seven antennas. The contract, worth 147 million euros, covers the design, manufacture, transport and on-site integration of the antennas. It is the largest contract ever signed in ground-based astronomy in Europe. The ALMA antennas present difficult technical challenges, since the antenna surface accuracy must be within 25 microns, the pointing accuracy within 0.6 arc seconds, and the antennas must be able to be moved between various stations on the ALMA site. This is especially remarkable since the antennas will be located outdoor in all weather conditions, without any protection. Moreover, the ALMA antennas can be pointed directly at the Sun. ALMA will have a collecting area of more than 5,600 square meters, allowing for unprecedented measurements of extremely faint objects. The signing ceremony took place on December 6, 2005 at ESO Headquarters in Garching, Germany. "This contract represents a major milestone. It allows us to move forward, together with our American and Japanese colleagues, in this very ambitious and unique project," said ESO's Director General, Dr. Catherine Cesarsky. "By building ALMA, we are giving European astronomers access to the world's leading submillimetre facility at the beginning of the next decade, thereby fulfilling Europe's desire to play a major role in this field of fundamental research." Pascale Sourisse, Chairman and CEO of Alcatel Alenia Space, said: "We would like to thank ESO for trusting us to take on this new challenge. We are bringing to the table not only our recognized expertise in antenna development, but also our long-standing experience in

  10. 24 CFR 983.202 - Purpose of HAP contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Purpose of HAP contract. 983.202... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.202 Purpose of HAP contract. (a) Requirement. The PHA must enter into a HAP contract with the owner. The HAP contract must be...

  11. Incremental development and prototyping in current laboratory software development projects: Preliminary analysis

    NASA Technical Reports Server (NTRS)

    Griesel, Martha Ann

    1988-01-01

    Several Laboratory software development projects that followed nonstandard development processes, which were hybrids of incremental development and prototyping, are being studied. Factors in the project environment leading to the decision to use a nonstandard development process and affecting its success are analyzed. A simple characterization of project environment based on this analysis is proposed, together with software development approaches which have been found effective for each category. These approaches include both documentation and review requirements.

  12. 24 CFR 965.308 - Energy performance contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Energy performance contracts. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.308 Energy performance contracts. (a) Method of procurement. Energy performance contracting...

  13. 24 CFR 965.308 - Energy performance contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Energy performance contracts. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.308 Energy performance contracts. (a) Method of procurement. Energy performance contracting...

  14. 24 CFR 965.308 - Energy performance contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Energy performance contracts. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.308 Energy performance contracts. (a) Method of procurement. Energy performance contracting...

  15. 24 CFR 965.308 - Energy performance contracts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Energy performance contracts. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.308 Energy performance contracts. (a) Method of procurement. Energy performance contracting...

  16. 24 CFR 965.308 - Energy performance contracts.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Energy performance contracts. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.308 Energy performance contracts. (a) Method of procurement. Energy performance contracting...

  17. Flawed Execution: A Case Study on Operational Contract Support

    DTIC Science & Technology

    2016-06-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA JOINT APPLIED PROJECT FLAWED EXECUTION: A CASE STUDY ON OPERATIONAL CONTRACT SUPPORT June 2016...applied project 4. TITLE AND SUBTITLE FLAWED EXECUTION: A CASE STUDY ON OPERATIONAL CONTRACT SUPPORT 5. FUNDING NUMBERS 6. AUTHOR(S) Scott F...unlimited FLAWED EXECUTION: A CASE STUDY ON OPERATIONAL CONTRACT SUPPORT Scott F. Taggart, Captain, United States Marine Corps Jacob Ledford

  18. The Alcohol Dehydrogenase Kinetics Laboratory: Enhanced Data Analysis and Student-Designed Mini-Projects

    ERIC Educational Resources Information Center

    Silverstein, Todd P.

    2016-01-01

    A highly instructive, wide-ranging laboratory project in which students study the effects of various parameters on the enzymatic activity of alcohol dehydrogenase has been adapted for the upper-division biochemistry and physical biochemistry laboratory. Our two main goals were to provide enhanced data analysis, featuring nonlinear regression, and…

  19. Biotechnology by Design: An Introductory Level, Project-Based, Synthetic Biology Laboratory Program for Undergraduate Students.

    PubMed

    Beach, Dale L; Alvarez, Consuelo J

    2015-12-01

    Synthetic biology offers an ideal opportunity to promote undergraduate laboratory courses with research-style projects, immersing students in an inquiry-based program that enhances the experience of the scientific process. We designed a semester-long, project-based laboratory curriculum using synthetic biology principles to develop a novel sensory device. Students develop subject matter knowledge of molecular genetics and practical skills relevant to molecular biology, recombinant DNA techniques, and information literacy. During the spring semesters of 2014 and 2015, the Synthetic Biology Laboratory Project was delivered to sophomore genetics courses. Using a cloning strategy based on standardized BioBrick genetic "parts," students construct a "reporter plasmid" expressing a reporter gene (GFP) controlled by a hybrid promoter regulated by the lac-repressor protein (lacI). In combination with a "sensor plasmid," the production of the reporter phenotype is inhibited in the presence of a target environmental agent, arabinose. When arabinose is absent, constitutive GFP expression makes cells glow green. But the presence of arabinose activates a second promoter (pBAD) to produce a lac-repressor protein that will inhibit GFP production. Student learning was assessed relative to five learning objectives, using a student survey administered at the beginning (pre-survey) and end (post-survey) of the course, and an additional 15 open-ended questions from five graded Progress Report assignments collected throughout the course. Students demonstrated significant learning gains (p < 0.05) for all learning outcomes. Ninety percent of students indicated that the Synthetic Biology Laboratory Project enhanced their understanding of molecular genetics. The laboratory project is highly adaptable for both introductory and advanced courses.

  20. Uninvolved versus target muscle contraction during contract: relax proprioceptive neuromuscular facilitation stretching.

    PubMed

    Azevedo, Daniel Camara; Melo, Raphael Marques; Alves Corrêa, Ricardo Vidal; Chalmers, Gordon

    2011-08-01

    The purpose of this study was to compare the acute effect of the contract-relax (CR) stretching technique on knee active range of motion (ROM) using target muscle contraction or an uninvolved muscle contraction. pre-test post-test control experimental design. Clinical research laboratory. Sixty healthy men were randomly assigned to one of three groups. The Contract-Relax group (CR) performed a traditional hamstring CR stretch, the Modified Contract-Relax group (MCR) performed hamstring CR stretching using contraction of an uninvolved muscle distant from the target muscle, and the Control group (CG) did not stretch. Active knee extension test was performed before and after the stretching procedure. Two-way between-within analysis of variance (ANOVA) results showed a significant interaction between group and pre-test to post-test (p < 0.001). Post-hoc examination of individual groups showed no significant change in ROM for the CG (0.8°, p = 0.084), and a significant moderate increase in ROM for both the CR (7.0°, p < 0.001) and MCR (7.0°, p < 0.001) groups. ROM gain following a CR PNF procedure is the same whether the target stretching muscle is contracted, or an uninvolved muscle is contracted. Copyright © 2011 Elsevier Ltd. All rights reserved.

  1. 75 FR 55199 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ...Section 342(b) of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 1995, Public Law (Pub. L.) 103-337 (10 U.S.C. 2358 note), as amended by section 1109 of NDAA for FY 2000, Public Law 106-65, and section 1114 of NDAA for FY 2001, Public Law 106-398, authorizes the Secretary of Defense to conduct personnel demonstration projects at DoD laboratories designated as Science and Technology Reinvention Laboratories (STRLs) to determine whether a specified change in personnel management policies or procedures would result in improved Federal personnel management. Section 1105 of the NDAA for FY 2010, Public Law 111-84, 123 Stat. 2486, October 28, 2009, designates additional DoD laboratories as STRLs for the purpose of designing and implementing personnel management demonstration projects for conversion of employees from the personnel system which applied on October 28, 2009. The ARDEC is listed in subsection 1105(a) of NDAA for FY 2010 as one of the newly designated STRLs.

  2. A semester-long project-oriented biochemistry laboratory based on Helicobacter pylori urease.

    PubMed

    Farnham, Kate R; Dube, Danielle H

    2015-01-01

    Here we present the development of a 13 week project-oriented biochemistry laboratory designed to introduce students to foundational biochemical techniques and then enable students to perform original research projects once they have mastered these techniques. In particular, we describe a semester-long laboratory that focuses on a biomedically relevant enzyme--Helicobacter pylori (Hp) urease--the activity of which is absolutely required for the gastric pathogen Hp to colonize the human stomach. Over the course of the semester, students undertake a biochemical purification of Hp urease, assess the success of their purification, and investigate the activity of their purified enzyme. In the final weeks of the semester, students design and implement their own experiments to study Hp urease. This laboratory provides students with an understanding of the importance of biochemistry in human health while empowering them to engage in an active area of research. © 2015 The International Union of Biochemistry and Molecular Biology.

  3. Muscle Contraction Arrests Tumor Growth

    DTIC Science & Technology

    2006-09-01

    AD_________________ Award Number: W81XWH-05-1-0464 TITLE: Muscle Contraction Arrests Tumor Growth...DATE 01-09-2006 2. REPORT TYPE Annual 3. DATES COVERED 1 Sep 2005 – 31 Aug 2006 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Muscle ... Contraction Arrests Tumor Growth 5b. GRANT NUMBER W81XWH-05-1-0464 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Kim Westerlind, Ph.D. 5d. PROJECT NUMBER

  4. Quality Indicators in Laboratory Medicine: the status of the progress of IFCC Working Group "Laboratory Errors and Patient Safety" project.

    PubMed

    Sciacovelli, Laura; Lippi, Giuseppe; Sumarac, Zorica; West, Jamie; Garcia Del Pino Castro, Isabel; Furtado Vieira, Keila; Ivanov, Agnes; Plebani, Mario

    2017-03-01

    The knowledge of error rates is essential in all clinical laboratories as it enables them to accurately identify their risk level, and compare it with those of other laboratories in order to evaluate their performance in relation to the State-of-the-Art (i.e. benchmarking) and define priorities for improvement actions. Although no activity is risk free, it is widely accepted that the risk of error is minimized by the use of Quality Indicators (QIs) managed as a part of laboratory improvement strategy and proven to be suitable monitoring and improvement tools. The purpose of QIs is to keep the error risk at a level that minimizes the likelihood of patients. However, identifying a suitable State-of-the-Art is challenging, because it calls for the knowledge of error rates measured in a variety of laboratories throughout world that differ in their organization and management, context, and the population they serve. Moreover, it also depends on the choice of the events to keep under control and the individual procedure for measurement. Although many laboratory professionals believe that the systemic use of QIs in Laboratory Medicine may be effective in decreasing errors occurring throughout the total testing process (TTP), to improve patient safety as well as to satisfy the requirements of International Standard ISO 15189, they find it difficult to maintain standardized and systematic data collection, and to promote continued high level of interest, commitment and dedication in the entire staff. Although many laboratories worldwide express a willingness to participate to the Model of QIs (MQI) project of IFCC Working Group "Laboratory Errors and Patient Safety", few systematically enter/record their own results and/or use a number of QIs designed to cover all phases of the TTP. Many laboratories justify their inadequate participation in data collection of QIs by claiming that the number of QIs included in the MQI is excessive. However, an analysis of results suggests

  5. Flow Induced Vibration Program at Argonne National Laboratory

    NASA Astrophysics Data System (ADS)

    1984-01-01

    The Argonne National Laboratory's Flow Induced Vibration Program, currently residing in the Laboratory's Components Technology Division is discussed. Throughout its existence, the overall objective of the program was to develop and apply new and/or improved methods of analysis and testing for the design evaluation of nuclear reactor plant components and heat exchange equipment from the standpoint of flow induced vibration. Historically, the majority of the program activities were funded by the US Atomic Energy Commission, the Energy Research and Development Administration, and the Department of Energy. Current DOE funding is from the Breeder Mechanical Component Development Division, Office of Breeder Technology Projects; Energy Conversion and Utilization Technology Program, Office of Energy Systems Research; and Division of Engineering, Mathematical and Geosciences, office of Basic Energy Sciences. Testing of Clinch River Breeder Reactor upper plenum components was funded by the Clinch River Breeder Reactor Plant Project Office. Work was also performed under contract with Foster Wheeler, General Electric, Duke Power Company, US Nuclear Regulatory Commission, and Westinghouse.

  6. EDITORIAL: Student undergraduate laboratory and project work

    NASA Astrophysics Data System (ADS)

    Schumacher, Dieter

    2007-05-01

    that new experiments which illustrate both fundamental physics and modern technology can be realized even with a small budget. Traditional labwork courses often provide a catalogue of well known experiments. The students must first learn the theoretical background. They then assemble the setup from specified equipment, collect the data and perform the default data processing. However, there is no way to learn to swim without water. In order to achieve a constructivist access to learning, 'project labs' are needed. In a project labwork course a small group of students works as a team on a mini research project. The students have to specify the question of research, develop a suitable experimental setup, conduct the experiment and find a suitable way to evaluate the data. Finally they must present their results e.g. in the framework of a public poster session. Three contributions refer to this approach, however they focus on different aspects: 'Project laboratory for first-year students' by Gorazd Planinšič, 'RealTime Physics: active learning laboratories' by David Sokoloff et al and 'Labs outside labs: miniprojects at a spring camp for future physics teachers' by Leos Dvorák. Is it possible to prepare the students specifically for project labwork? This question is answered by the contribution 'A new labwork course for physics students: devices, methods and research projects' by Knut Neumann and Manuela Welzel. The two main parts of the labwork course cover first experimental devices (e.g. multimeters, oscilloscopes, different sensors, operational amplifiers, step motors, AD/DA-converters). Then subjects such as data processing, consideration of measurement uncertainties, keeping records or using tools like LABVIEW etc are focused on. Another concrete proposal for a new curriculum is provided by James Sharp et al, in 'Computer based learning in an undergraduate physics laboratory: interfacing and instrument control using MATLAB'. One can well imagine that project labs

  7. Performance Contracting - Accountability and the Michigan Education Program.

    ERIC Educational Resources Information Center

    Porter, John W.

    1972-01-01

    A report on the Michigan project in performance contracting is presented. In contrast to the Office of Economic Opportunity announcement that performance contracting is a failure, the Michigan program has been successful in the initial stage of a major experiment (Texarkana Project). The state legislature has appropriated $22.5 million for…

  8. An Approach to Developing the Laboratory Through Senior Design Projects.

    ERIC Educational Resources Information Center

    Faghri, Amir

    1987-01-01

    Describes a program in which senior engineering students are given the opportunity to design, make, and test apparatus intended for an upper-level teaching laboratory. Discusses such projects as a vapor compressor test stand with refrigerant mass flow measurement, a double-walled concentric annular heat pipe, and a vacuum filling station. (TW)

  9. 48 CFR 1523.303-72 - Care of laboratory animals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Care of laboratory animals... Material and Material Safety Data 1523.303-72 Care of laboratory animals. Contracting officers shall insert the clause at 1552.223-72, Care of Laboratory Animals, in all contracts involving the use of...

  10. 48 CFR 1523.303-72 - Care of laboratory animals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Care of laboratory animals... Material and Material Safety Data 1523.303-72 Care of laboratory animals. Contracting officers shall insert the clause at 1552.223-72, Care of Laboratory Animals, in all contracts involving the use of...

  11. 48 CFR 1523.303-72 - Care of laboratory animals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Care of laboratory animals... Material and Material Safety Data 1523.303-72 Care of laboratory animals. Contracting officers shall insert the clause at 1552.223-72, Care of Laboratory Animals, in all contracts involving the use of...

  12. 48 CFR 1523.303-72 - Care of laboratory animals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Care of laboratory animals... Material and Material Safety Data 1523.303-72 Care of laboratory animals. Contracting officers shall insert the clause at 1552.223-72, Care of Laboratory Animals, in all contracts involving the use of...

  13. Biotechnology by Design: An Introductory Level, Project-Based, Synthetic Biology Laboratory Program for Undergraduate Students†

    PubMed Central

    Beach, Dale L.; Alvarez, Consuelo J.

    2015-01-01

    Synthetic biology offers an ideal opportunity to promote undergraduate laboratory courses with research-style projects, immersing students in an inquiry-based program that enhances the experience of the scientific process. We designed a semester-long, project-based laboratory curriculum using synthetic biology principles to develop a novel sensory device. Students develop subject matter knowledge of molecular genetics and practical skills relevant to molecular biology, recombinant DNA techniques, and information literacy. During the spring semesters of 2014 and 2015, the Synthetic Biology Laboratory Project was delivered to sophomore genetics courses. Using a cloning strategy based on standardized BioBrick genetic “parts,” students construct a “reporter plasmid” expressing a reporter gene (GFP) controlled by a hybrid promoter regulated by the lac-repressor protein (lacI). In combination with a “sensor plasmid,” the production of the reporter phenotype is inhibited in the presence of a target environmental agent, arabinose. When arabinose is absent, constitutive GFP expression makes cells glow green. But the presence of arabinose activates a second promoter (pBAD) to produce a lac-repressor protein that will inhibit GFP production. Student learning was assessed relative to five learning objectives, using a student survey administered at the beginning (pre-survey) and end (post-survey) of the course, and an additional 15 open-ended questions from five graded Progress Report assignments collected throughout the course. Students demonstrated significant learning gains (p < 0.05) for all learning outcomes. Ninety percent of students indicated that the Synthetic Biology Laboratory Project enhanced their understanding of molecular genetics. The laboratory project is highly adaptable for both introductory and advanced courses. PMID:26753032

  14. Environmental testing philosophy for a Sandia National Laboratories small satellite project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cap, J.S.; Rackley, N.G.

    1996-03-01

    Sandia National Laboratories is the system integrator on a small satellite project. Following the intent of the NASA GEVS document, an integrated test philosophy was formulated to certify the satellite for flight. The purpose of this paper is to present that philosophy.

  15. The impact of contracting-out on health system performance: a conceptual framework.

    PubMed

    Liu, Xingzhu; Hotchkiss, David R; Bose, Sujata

    2007-07-01

    Despite the increased popularity of contracting-out of health services in developing countries, its effectiveness on overall health system performance is not yet conclusive. Except for substantial evidence of contracting-out's positive effect on access to health services and some evidence on improved equity in access, there is little evidence of contracting-out's impact on quality and efficiency. Most studies on the subject evaluate specific contracting-out projects against narrowly specified project objectives, not against more broadly defined health system goals. For this reason, conclusions of positive effects pertaining to project level may not hold at system level. This paper presents a conceptual framework that is expected to facilitate comprehensive, rigorous, and standardized evaluation of contracting-out at health system level. Specifically, this framework supports: full and standardized description of contracting-out interventions, study of the determinants of effectiveness, examination of provider and purchaser responses, assessment of the impact of contracting-out on all dimensions of health system performance, and cross-project analyses.

  16. 33 CFR 211.109 - Contract of sale.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Contract of sale. 211.109 Section... Navigation Project in Oklahoma, to Former Owners § 211.109 Contract of sale. Upon determination of the price... District Engineer will prepare a contract of sale containing the terms and conditions of the reconveyance...

  17. Assessment of Army Contracting Command’s Contract Management Processes (TACOM and RDECOM)

    DTIC Science & Technology

    2011-04-01

    Management Processes (TACOM and RDECOM)” was prepared for and funded by the Acquisition Program, Graduate School of Business & Public Policy, Naval...system and the Evolved Expendable Launch Vehicle rocket program. Rendon has taught contract management courses for the UCLA Government Contracts...program; he was also a senior faculty member for the Keller Graduate School of Management, where he taught MBA courses in project management and

  18. 24 CFR 891.565 - Term of HAP contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Term of HAP contract. 891.565... 8 Assistance § 891.565 Term of HAP contract. The term of the HAP contract for assisted units shall be 20 years. If the project is completed in stages, the term of the HAP contract for assisted units...

  19. The advantages of cost plus award fee contracts

    NASA Technical Reports Server (NTRS)

    Keathley, William C.

    1994-01-01

    A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

  20. Curiosity: the Mars Science Laboratory Project

    NASA Technical Reports Server (NTRS)

    Cook, Richard A.

    2012-01-01

    The Curiosity rover landed successfully in Gale Crater, Mars on August 5, 2012. This event was a dramatic high point in the decade long effort to design, build, test and fly the most sophisticated scientific vehicle ever sent to Mars. The real achievements of the mission have only just begun, however, as Curiosity is now searching for signs that Mars once possessed habitable environments. The Mars Science Laboratory Project has been one of the most ambitious and challenging planetary projects that NASA has undertaken. It started in the successful aftermath of the 2003 Mars Exploration Rover project and was designed to take significant steps forward in both engineering and scientific capabilities. This included a new landing system capable of emplacing a large mobile vehicle over a wide range of potential landing sites, advanced sample acquisition and handling capabilities that can retrieve samples from both rocks and soil, and a high reliability avionics suite that is designed to permit long duration surface operations. It also includes a set of ten sophisticated scientific instruments that will investigate both the geological context of the landing site plus analyze samples to understand the chemical & organic composition of rocks & soil found there. The Gale Crater site has been specifically selected as a promising location where ancient habitable environments may have existed and for which evidence may be preserved. Curiosity will spend a minimum of one Mars year (about two Earth years) looking for this evidence. This paper will report on the progress of the mission over the first few months of surface operations, plus look retrospectively at lessons learned during both the development and cruise operations phase of the mission..

  1. Undergraduate Introductory Quantitative Chemistry Laboratory Course: Interdisciplinary Group Projects in Phytoremediation

    ERIC Educational Resources Information Center

    Van Engelen, Debra L.; Suljak, Steven W.; Hall, J. Patrick; Holmes, Bert E.

    2007-01-01

    The laboratory course around the phytoremediation is designed to develop both individual skills and promote cooperative learning while starting students work on projects in a specific area of environmental chemistry and analysis. Many research-active undergraduate institutions have developed courses, which are interdisciplinary in nature that…

  2. The Mouse Genomes Project: a repository of inbred laboratory mouse strain genomes.

    PubMed

    Adams, David J; Doran, Anthony G; Lilue, Jingtao; Keane, Thomas M

    2015-10-01

    The Mouse Genomes Project was initiated in 2009 with the goal of using next-generation sequencing technologies to catalogue molecular variation in the common laboratory mouse strains, and a selected set of wild-derived inbred strains. The initial sequencing and survey of sequence variation in 17 inbred strains was completed in 2011 and included comprehensive catalogue of single nucleotide polymorphisms, short insertion/deletions, larger structural variants including their fine scale architecture and landscape of transposable element variation, and genomic sites subject to post-transcriptional alteration of RNA. From this beginning, the resource has expanded significantly to include 36 fully sequenced inbred laboratory mouse strains, a refined and updated data processing pipeline, and new variation querying and data visualisation tools which are available on the project's website ( http://www.sanger.ac.uk/resources/mouse/genomes/ ). The focus of the project is now the completion of de novo assembled chromosome sequences and strain-specific gene structures for the core strains. We discuss how the assembled chromosomes will power comparative analysis, data access tools and future directions of mouse genetics.

  3. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  4. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  5. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  6. 25 CFR 136.1 - Repayment contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Repayment contracts. 136.1 Section 136.1 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.1 Repayment contracts. A rehabilitation program was established on the Fort Hall Unit...

  7. Successful contracting of prevention services: fighting malnutrition in Senegal and Madagascar.

    PubMed

    Marek, T; Diallo, I; Ndiaye, B; Rakotosalama, J

    1999-12-01

    There are very few documented large-scale successes in nutrition in Africa, and virtually no consideration of contracting for preventive services. This paper describes two successful large-scale community nutrition projects in Africa as examples of what can be done in prevention using the contracting approach in rural as well as urban areas. The two case-studies are the Secaline project in Madagascar, and the Community Nutrition Project in Senegal. The article explains what is meant by 'success' in the context of these two projects, how these results were achieved, and how certain bottlenecks were avoided. Both projects are very similar in the type of service they provide, and in combining private administration with public finance. The article illustrates that contracting out is a feasible option to be seriously considered for organizing certain prevention programmes on a large scale. There are strong indications from these projects of success in terms of reducing malnutrition, replicability and scale, and community involvement. When choosing that option, a government can tap available private local human resources through contracting out, rather than delivering those services by the public sector. However, as was done in both projects studied, consideration needs to be given to using a contract management unit for execution and monitoring, which costs 13-17% of the total project's budget. Rigorous assessments of the cost-effectiveness of contracted services are not available, but improved health outcomes, targeting of the poor, and basic cost data suggest that the programmes may well be relatively cost-effective. Although the contracting approach is not presented as the panacea to solve the malnutrition problem faced by Africa, it can certainly provide an alternative in many countries to increase coverage and quality of services.

  8. Quality Indicators in Laboratory Medicine: from theory to practice. Preliminary data from the IFCC Working Group Project "Laboratory Errors and Patient Safety".

    PubMed

    Sciacovelli, Laura; O'Kane, Maurice; Skaik, Younis Abdelwahab; Caciagli, Patrizio; Pellegrini, Cristina; Da Rin, Giorgio; Ivanov, Agnes; Ghys, Timothy; Plebani, Mario

    2011-05-01

    The adoption of Quality Indicators (QIs) has prompted the development of tools to measure and evaluate the quality and effectiveness of laboratory testing, first in the hospital setting and subsequently in ambulatory and other care settings. While Laboratory Medicine has an important role in the delivery of high-quality care, no consensus exists as yet on the use of QIs focussing on all steps of the laboratory total testing process (TTP), and further research in this area is required. In order to reduce errors in laboratory testing, the IFCC Working Group on "Laboratory Errors and Patient Safety" (WG-LEPS) developed a series of Quality Indicators, specifically designed for clinical laboratories. In the first phase of the project, specific QIs for key processes of the TTP were identified, including all the pre-, intra- and post-analytic steps. The overall aim of the project is to create a common reporting system for clinical laboratories based on standardized data collection, and to define state-of-the-art and Quality Specifications (QSs) for each QI independent of: a) the size of organization and type of activities; b) the complexity of processes undertaken; and c) different degree of knowledge and ability of the staff. The aim of the present paper is to report the results collected from participating laboratories from February 2008 to December 2009 and to identify preliminary QSs. The results demonstrate that a Model of Quality Indicators managed as an External Quality Assurance Program can serve as a tool to monitor and control the pre-, intra- and post-analytical activities. It might also allow clinical laboratories to identify risks that lead to errors resulting in patient harm: identification and design of practices that eliminate medical errors; the sharing of information and education of clinical and laboratory teams on practices that reduce or prevent errors; the monitoring and evaluation of improvement activities.

  9. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  10. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  11. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  12. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  13. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dinehart, M.

    1996-09-01

    This document reports status and technical progress for Los Alamos National Laboratories 94-1 Research and Development projects. An introduction to the project structure and an executive summary are included. Projects described include Electrolytic Decontamination, Combustibles, Detox, Sand, Slag, and Crucible, Surveillance, and Core Technology.

  14. The Analysis of Seawater: A Laboratory-Centered Learning Project in General Chemistry.

    ERIC Educational Resources Information Center

    Selco, Jodye I.; Roberts, Julian L., Jr.; Wacks, Daniel B.

    2003-01-01

    Describes a sea-water analysis project that introduces qualitative and quantitative analysis methods and laboratory methods such as gravimetric analysis, potentiometric titration, ion-selective electrodes, and the use of calibration curves. Uses a problem-based cooperative teaching approach. (Contains 24 references.) (YDS)

  15. Wartime Construction Project Outcomes as a Function of Contract Type

    DTIC Science & Technology

    2016-07-01

    contract types has been well established. The theory of contractual incentives promulgated by Sherer (1964) established expected contractor...behaviors using a max- imization problem. The theory focuses on expected contractor behaviors in incentive contracts (cf. Federal Acquisition Regulation...Scherer, F. M. (1964). The theory of contractual incentives for cost reduction. Quarterly Journal of Economics, 78, 257–280. Tawazuh Commercial and

  16. Implementation of Good Clinical Laboratory Practice (GCLP) guidelines within the External Quality Assurance Program Oversight Laboratory (EQAPOL).

    PubMed

    Todd, Christopher A; Sanchez, Ana M; Garcia, Ambrosia; Denny, Thomas N; Sarzotti-Kelsoe, Marcella

    2014-07-01

    The EQAPOL contract was awarded to Duke University to develop and manage global proficiency testing programs for flow cytometry-, ELISpot-, and Luminex bead-based assays (cytokine analytes), as well as create a genetically diverse panel of HIV-1 viral cultures to be made available to National Institutes of Health (NIH) researchers. As a part of this contract, EQAPOL was required to operate under Good Clinical Laboratory Practices (GCLP) that are traditionally used for laboratories conducting endpoint assays for human clinical trials. EQAPOL adapted these guidelines to the management of proficiency testing programs while simultaneously incorporating aspects of ISO/IEC 17043 which are specifically designed for external proficiency management. Over the first two years of the contract, the EQAPOL Oversight Laboratories received training, developed standard operating procedures and quality management practices, implemented strict quality control procedures for equipment, reagents, and documentation, and received audits from the EQAPOL Central Quality Assurance Unit. GCLP programs, such as EQAPOL, strengthen a laboratory's ability to perform critical assays and provide quality assessments of future potential vaccines. © 2013.

  17. 13 CFR 305.13 - Contract change orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Contract change orders. 305.13 Section 305.13 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.13 Contract...

  18. 75 FR 52139 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... of proposal to design and implement a personnel management demonstration project. SUMMARY: Section..., 2009, designates additional DoD laboratories as STRLs for the purpose of designing and implementing... experiences, SSC Atlantic and SSC Pacific have the benefit of being in earlier personnel systems designed to...

  19. Reactions and Assessments: Educational Laboratory Theatre Project, 1966-70. Final Report.

    ERIC Educational Resources Information Center

    Hoetker, James; And Others

    The general plan of the 4-year (1966-1970) Educational Laboratory Theatre Project was to have theatre companies in Rhode Island, New Orleans, and Los Angeles give five matinee performances per week for high school students and three evening performances for adults in order to (1) make extensive use of professional theatre as an integral part of…

  20. Energy Savings Performance Contract Energy Sales Agreement Toolkit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    FEMP developed the Energy Savings Performance Contracting Energy Sales Agreement (ESPC ESA) Toolkit to provide federal agency contracting officers and other acquisition team members with information that will facilitate the timely execution of ESPC ESA projects.

  1. Unsteady-State Heat Transfer Involving a Phase Change: An Example of a 'Project-Oriented' Undergraduate Laboratory.

    ERIC Educational Resources Information Center

    Sundberg, Donald C.; Someshwar, Arun V.

    1989-01-01

    Describes the structure of an in-depth laboratory project chemical engineering. Provides modeling work to guide experimentation and experimental work on heat transfer analysis. Discusses the experimental results and evaluation of the project. (YP)

  2. From genes to proteins to behavior: a laboratory project that enhances student understanding in cell and molecular biology.

    PubMed

    Aronson, Benjamin D; Silveira, Linda A

    2009-01-01

    In the laboratory, students can actively explore concepts and experience the nature of scientific research. We have devised a 5-wk laboratory project in our introductory college biology course whose aim was to improve understanding in five major concepts that are central to basic cellular, molecular biology, and genetics while teaching molecular biology techniques. The project was focused on the production of adenine in Saccharomyces cerevisiae and investigated the nature of mutant red colonies of this yeast. Students created red mutants from a wild-type strain, amplified the two genes capable of giving rise to the red phenotype, and then analyzed the nucleotide sequences. A quiz assessing student understanding in the five areas was given at the start and the end of the course. Analysis of the quiz showed significant improvement in each of the areas. These areas were taught in the laboratory and the classroom; therefore, students were surveyed to determine whether the laboratory played a role in their improved understanding of the five areas. Student survey data demonstrated that the laboratory did have an important role in their learning of the concepts. This project simulated steps in a research project and could be adapted for an advanced course in genetics.

  3. Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether-Linked Nitramines

    DTIC Science & Technology

    2016-07-01

    ARL-TR-7706 ● JULY 2016 US Army Research Laboratory Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether...JULY 2016 US Army Research Laboratory Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether-Linked Nitramines by...YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) July 2016 2. REPORT TYPE Final 3. DATES COVERED (From - To) Fiscal Year 2013 4. TITLE

  4. Idaho National Laboratory Annual Report FY 2013 LDRD Project Summaries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dena Tomchak

    The FY 2013 LDRD Annual Report is a compendium of the diverse research performed to develop and ensure the INL’s technical capabilities support the current and future DOE missions and national research priorities. LDRD is essential to INL—it provides a means for the Laboratory to maintain scientific and technical vitality while funding highly innovative, high-risk science and technology research and development (R&D) projects. The program enhances technical capabilities at the Laboratory, providing scientific and engineering staff with opportunities to explore proof-of-principle ideas, advanced studies of innovative concepts, and preliminary technical analyses. Established by Congress in 1991, the LDRD Program provesmore » its benefit each year through new programs, intellectual property, patents, copyrights, national and international awards, and publications.« less

  5. Establishing guidelines for incentive/disincentive contracting at ODOT.

    DOT National Transportation Integrated Search

    2007-02-01

    This report describes the results of a research project which explored the use of Incentive / Disincentive (I/D) contracting at : the Oregon Department of Transportation (ODOT). The research found that I/D contracting is a relatively rare practice : ...

  6. 49 CFR 30.11 - Use of solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... § 30.15, Restrictions on Federal Public Works Projects, in contractions and solicitations, if— (1) The... contract is awarded during fiscal year 1988. (c) Any contract already awarded that should have contained...

  7. 49 CFR 30.11 - Use of solicitation provisions and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... § 30.15, Restrictions on Federal Public Works Projects, in contractions and solicitations, if— (1) The... contract is awarded during fiscal year 1988. (c) Any contract already awarded that should have contained...

  8. 49 CFR 30.11 - Use of solicitation provisions and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... § 30.15, Restrictions on Federal Public Works Projects, in contractions and solicitations, if— (1) The... contract is awarded during fiscal year 1988. (c) Any contract already awarded that should have contained...

  9. 49 CFR 30.11 - Use of solicitation provisions and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... § 30.15, Restrictions on Federal Public Works Projects, in contractions and solicitations, if— (1) The... contract is awarded during fiscal year 1988. (c) Any contract already awarded that should have contained...

  10. 49 CFR 30.11 - Use of solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... § 30.15, Restrictions on Federal Public Works Projects, in contractions and solicitations, if— (1) The... contract is awarded during fiscal year 1988. (c) Any contract already awarded that should have contained...

  11. Design and Calibration of the US Army Research Laboratory (ARL) Closed Loop Laboratory Radio Frequency (RF) Propagation Section

    DTIC Science & Technology

    2016-10-01

    ARL-TR-7860 ● OCT 2016 US Army Research Laboratory Design and Calibration of the US Army Research Laboratory (ARL) Closed Loop ...ARL-TR-7860 ● OCT 2016 US Army Research Laboratory Design and Calibration of the US Army Research Laboratory (ARL) Closed Loop Laboratory...Design and Calibration of the US Army Research Laboratory (ARL) Closed Loop Laboratory Radio Frequency (RF) Propagation Section 5a. CONTRACT NUMBER

  12. New working paradigms in research laboratories.

    PubMed

    Keighley, Wilma; Sewing, Andreas

    2009-07-01

    Work in research laboratories, especially within centralised functions in larger organisations, is changing fast. With easier access to external providers and Contract Research Organisations, and a focus on budgets and benchmarking, scientific expertise has to be complemented with operational excellence. New concepts, globally shared projects and restricted resources highlight the constraints of traditional operating models working from Monday to Friday and nine to five. Whilst many of our scientists welcome this new challenge, organisations have to enable and foster a more business-like mindset. Organisational structures, remuneration, as well as systems in finance need to be adapted to build operations that are best-in-class rather than merely minimising negative impacts of current organisational structures.

  13. Environmental Technology (Laboratory Analysis and Environmental Sampling) Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Hinojosa, Oscar V.; Guillen, Alfonso

    A project assessed the need and developed a curriculum for environmental technology (laboratory analysis and environmental sampling) in the emerging high technology centered around environmental safety and health in Texas. Initial data were collected through interviews by telephone and in person and through onsite visits. Additional data was…

  14. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  15. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  16. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  17. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  18. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  19. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  20. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  1. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  2. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  3. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  4. Clinical Laboratory Sciences Discipline Advisory Group Final Report. Kentucky Allied Health Project.

    ERIC Educational Resources Information Center

    Kentucky Council on Public Higher Education, Frankfort.

    Education in the clinical laboratory sciences in Kentucky and articulation within the field are examined, based on the Kentucky Allied Health Project (KAHP), which designed an articulated statewide system to promote entry and exit of personnel at a variety of educational levels. The KAHP model promotes articulation in learning, planning, and…

  5. Exploring Protein Structure and Dynamics through a Project-Oriented Biochemistry Laboratory Module

    ERIC Educational Resources Information Center

    Lipchock, James M.; Ginther, Patrick S.; Douglas, Bonnie B.; Bird, Kelly E.; Loria, J. Patrick

    2017-01-01

    Here, we present a 10-week project-oriented laboratory module designed to provide a course-based undergraduate research experience in biochemistry that emphasizes the importance of biomolecular structure and dynamics in enzyme function. This module explores the impact of mutagenesis on an important active site loop for a biomedically-relevant…

  6. Complete Instruction and Project Book for Contracting. A Library Cooperation Tool.

    ERIC Educational Resources Information Center

    Radcliffe, Walter H.; Kemper, Robert E.

    An important tool for establishing efficient total library service is contracting, which allows a unit of government or a library to obtain the use of the resources of another library according to its specific needs. A contract can cover services to be purchased, financial arrangements, administrative responsibilities, legal considerations, and…

  7. 75 FR 39034 - Public Housing Annual Contributions Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... Contributions Contract (ACC) with certain requirements applicable to all project and other requirements... (General Depository Agreements); 52190-A and B (Declaration of Trust); and 52840-A (Capital Fund ACC... terms and conditions contained in an Annual Contributions Contract (ACC) with certain requirements...

  8. 33 CFR 211.79 - Contract of sale.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Contract of sale. 211.79 Section... DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Sale of... Use § 211.79 Contract of sale. The agreement between the purchaser and the Government will be...

  9. 24 CFR 881.502 - Term of contract.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Payments Contract § 881.502 Term of contract. (a) Term (except for Manufactured Home Parks). The term of... acquisition of the property; and (ii) For assisted units in a project financed with the aid of a loan insured... assistance. (b) Term for manufactured home parks. For manufactured home units or spaces in substantially...

  10. 24 CFR 881.502 - Term of contract.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Payments Contract § 881.502 Term of contract. (a) Term (except for Manufactured Home Parks). The term of... acquisition of the property; and (ii) For assisted units in a project financed with the aid of a loan insured... assistance. (b) Term for manufactured home parks. For manufactured home units or spaces in substantially...

  11. 24 CFR 881.502 - Term of contract.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Payments Contract § 881.502 Term of contract. (a) Term (except for Manufactured Home Parks). The term of... acquisition of the property; and (ii) For assisted units in a project financed with the aid of a loan insured... assistance. (b) Term for manufactured home parks. For manufactured home units or spaces in substantially...

  12. 24 CFR 881.502 - Term of contract.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Payments Contract § 881.502 Term of contract. (a) Term (except for Manufactured Home Parks). The term of... acquisition of the property; and (ii) For assisted units in a project financed with the aid of a loan insured... assistance. (b) Term for manufactured home parks. For manufactured home units or spaces in substantially...

  13. Hydraulic shock waves in an inclined chute contraction

    NASA Astrophysics Data System (ADS)

    Jan, C.-D.; Chang, C.-J.

    2009-04-01

    A chute contraction is a common structure used in hydraulic engineering for typical reasons such as increase of bottom slope, transition from side channel intakes to tunnel spillways, reduction of chute width due to bridges, transition structures in flood diversion works, among others. One of the significant chute contractions in Taiwan is that used in the Yuanshantzu Flood Diversion Project of Keelung River. The diversion project is designed to divert flood water from upper Keelung River into East Sea with a capasity of 1,310 cubic meters per second for mitigating the flood damage of lower part of Keelung River basin in Northern Taiwan. An inclined chute contraction is used to connect Keelung River and a diversion turnel. The inlet and outlet works of the diversion project is located at Ruifang in the Taipei County of north Taiwan. The diameter of diversion tunnel is 12 meters and the total length of tunnel is 2,484 meters. The diversion project has been completed and successfully executed many times since 2004 to lower the water level of Keelung River in typhoon seasons for avioding flooding problems in the lower part of Keelung River basin. Flow in a chute contraction has complicated flow pattern due to the existence of shock waves in it. A simple and useful calculation procedure for the maximum height and its position of shock waves is essentially needed for the preliminary design stage of a chute contraction. Hydraulic shock waves in an inclined chute contraction were experimentally and numerically investigated in this study with the consideration of the effects of sidewall deflection angle, bottom inclination angle and Froude number of approaching flow. The flow pattern of hydraulic shock waves in a chute contraction was observed. The main issue of designing chute contraction is to estimate the height and position of maximum shock wave for the consideration of freeboards. Achieving this aim, the experimental data are adopted and analyzed for the shock angle

  14. An Organizational Climate Assessment of the Army Contracting Workforce

    DTIC Science & Technology

    2016-12-01

    WITHIN THE ARMY ............................32  L.  THE ARMY CONTRACTING STRUCTURE AND ITS ORGANIZATIONAL CLIMATE...describes the dimensions used to assess organizational climate. Responses to a web- based survey administered to the Army’s contracting workforce...workforce. Based on the survey results, this project provides an assessment of the Army’s contracting workforce organizational climate. Additionally

  15. SOLAR ROTATION: A Laboratory Exercise from Project CLEA and the GONG Project

    NASA Astrophysics Data System (ADS)

    Marschall, L. A.; Sudol, J. J.; Snyder, G. A.

    2002-12-01

    Digital images from the GONG Project provide a nearly continuous record of sunspots that are ideal for determining the rate of rotation of the Sun. A new laboratory exercise from Project CLEA provides students with the capability to access an archive of 368 images of the Sun obtained at GONG solar telescopes between January 1, 2002 and April 30, 2002, during a period near solar maximum when large numbers of spots were daily visible on the sun. The resolution of each image is about 2.5 arcsec per pixel (or about 0.25 degree in longitude and latitude at the center of the solar disk). Because these images have such exquisite spatial and temporal resolution, they are the best images to date from which students can determine the solar rotation rate. CLEA software for this exercise allows students to select images by date and time, to overlay a coordinate grid on the image, and to record the latitudes and longitudes of sunspots. This data can be tabulated and analyzed with the software to determine solar rotation rates. The expected precision in the solar rotation rates is +/- 3 hours. Students will also have the ability to combine their chosen images into a digital movie showing the solar rotation. The exercise includes a student workbook and a technical manual, as well as a CD-rom of the data and the software. This exercise was produced with funding from the National Science Foundation and Gettysburg College and with the support of the GONG Project at the National Solar Observatory.

  16. Muscle Contraction.

    PubMed

    Sweeney, H Lee; Hammers, David W

    2018-02-01

    SUMMARYMuscle cells are designed to generate force and movement. There are three types of mammalian muscles-skeletal, cardiac, and smooth. Skeletal muscles are attached to bones and move them relative to each other. Cardiac muscle comprises the heart, which pumps blood through the vasculature. Skeletal and cardiac muscles are known as striated muscles, because the filaments of actin and myosin that power their contraction are organized into repeating arrays, called sarcomeres, that have a striated microscopic appearance. Smooth muscle does not contain sarcomeres but uses the contraction of filaments of actin and myosin to constrict blood vessels and move the contents of hollow organs in the body. Here, we review the principal molecular organization of the three types of muscle and their contractile regulation through signaling mechanisms and discuss their major structural and functional similarities that hint at the possible evolutionary relationships between the cell types. Copyright © 2018 Cold Spring Harbor Laboratory Press; all rights reserved.

  17. KY-CTDS : Kentucky contract time determination system

    DOT National Transportation Integrated Search

    2000-06-30

    This research project was to update the KyTC's planning tool used for the determination of contract time allotted for contractors to complete highway construction projects in the Commonwealth of Kentucky. Although this issue was initially raised by t...

  18. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    DTIC Science & Technology

    2009-02-01

    cost of capital ( WACC ). WACC is the cost of debt plus the cost of equity both weighted by the market values debt and equity, respectively. The cost...Beta WACC Technical Risk CPFF/CPAF …. FFP/ MYP - Contract Choice (FAR 16.1) Margin – (p = f(NBV, n, α, risk)) Payments (α) FCOM ( = f(NBV, Treasury...projections, layers on the profit and contract financing policy, estimates the levered WACC as the discount rate, and finally calculates the NPV of the

  19. Alternative contracting research : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    Alternative contracting methods have become popular alternatives to the traditional practice whose emphasis is on low bid acquisition. The benefits of decreased project schedule, increased job quality, and improved delivery process have demonstrated ...

  20. Connecting biology and organic chemistry introductory laboratory courses through a collaborative research project.

    PubMed

    Boltax, Ariana L; Armanious, Stephanie; Kosinski-Collins, Melissa S; Pontrello, Jason K

    2015-01-01

    Modern research often requires collaboration of experts in fields, such as math, chemistry, biology, physics, and computer science to develop unique solutions to common problems. Traditional introductory undergraduate laboratory curricula in the sciences often do not emphasize connections possible between the various disciplines. We designed an interdisciplinary, medically relevant, project intended to help students see connections between chemistry and biology. Second term organic chemistry laboratory students designed and synthesized potential polymer inhibitors or inducers of polyglutamine protein aggregation. The use of novel target compounds added the uncertainty of scientific research to the project. Biology laboratory students then tested the novel potential pharmaceuticals in Huntington's disease model assays, using in vitro polyglutamine peptide aggregation and in vivo lethality studies in Drosophila. Students read articles from the primary literature describing the system from both chemical and biological perspectives. Assessment revealed that students emerged from both courses with a deeper understanding of the interdisciplinary nature of biology and chemistry and a heightened interest in basic research. The design of this collaborative project for introductory biology and organic chemistry labs demonstrated how the local interests and expertise at a university can be drawn from to create an effective way to integrate these introductory courses. Rather than simply presenting a series of experiments to be replicated, we hope that our efforts will inspire other scientists to think about how some aspect of authentic work can be brought into their own courses, and we also welcome additional collaborations to extend the scope of the scientific exploration. © 2015 The International Union of Biochemistry and Molecular Biology.

  1. Incidental/Absorbed Exposure Electromagnetic Field Energy Ratio Analysis Under Laboratory Experiment Conditions (for Russian-French Immunology Project)

    DTIC Science & Technology

    2007-11-07

    with the International Science and Technology Center ( ISTC ), Moscow. ISTC Project No. 3629 Incidental/absorbed exposure electromagnetic field...5a. CONTRACT NUMBER ISTC Registration No: 3629 5b. GRANT NUMBER 4. TITLE AND SUBTITLE Incidental/absorbed exposure electromagnetic field...REPORT NUMBER(S) ISTC 06-7005 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution is unlimited. 13

  2. Development of a Laboratory Project to Determine Human ABO Genotypes--Limitations Lead to Further Student Explorations

    ERIC Educational Resources Information Center

    Salerno, Theresa A.

    2009-01-01

    A multiplex allele-specific PCR analysis was developed to identify six "common" genotypes: AA, AO, BB, BO, OO, and AB. This project included a pre-laboratory exercise that provided active learning experiences and developed critical thinking skills. This laboratory resulted in many successful analyses, which were verified by student knowledge of…

  3. Comparative analysis of JKR Sarawak form of contract and Malaysia Standard form of building contract (PWD203A)

    NASA Astrophysics Data System (ADS)

    Yunus, A. I. A.; Muhammad, W. M. N. W.; Saaid, M. N. F.

    2018-04-01

    Standard form of contract is normally being used in Malaysia construction industry in establishing legal relation between contracting parties. Generally, most of Malaysia federal government construction project used PWD203A which is a standard form of contract to be used where Bills of Quantities Form Part of the Contract and it is issued by Public Works Department (PWD/JKR). On the other hand in Sarawak, the largest state in Malaysia, the state government has issued their own standard form of contract namely JKR Sarawak Form of Contract 2006. Even both forms have been used widely in construction industry; there is still lack of understanding on both forms. The aim of this paper is to identify significant provision on both forms of contract. Document analysis has been adopted in conducting an in-depth review on both forms. It is found that, both forms of contracts have differences and similarities on several provisions specifically matters to definitions and general; execution of the works; payments, completion and final account; and delay, dispute resolution and determination.

  4. POLizied e-Learning Using Contract Management

    ERIC Educational Resources Information Center

    Espinosa, Espinosa David; Noguez, Julieta; Benes, Bedrich; Bueno, Abel

    2005-01-01

    We present an innovative way to manage online learning by administering experiential learning activities during a semester-long, web-based course that is designed with the Project Oriented Learning methodology. A consulting-style guiding thread for in-class and remote workshops is implemented using a professionally relevant project contract that…

  5. A Hybrid Integrated Laboratory and Inquiry-Based Research Experience: Replacing Traditional Laboratory Instruction with a Sustainable Student-Led Research Project

    ERIC Educational Resources Information Center

    Hartings, Matthew R.; Fox, Douglas M.; Miller, Abigail E.; Muratore, Kathryn E.

    2015-01-01

    The Department of Chemistry at American University has replaced its junior- and senior-level laboratory curriculum with two, two-semester long, student-led research projects as part of the department's American Chemical Society-accredited program. In the first semester of each sequence, a faculty instructor leads the students through a set of…

  6. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship

    PubMed Central

    Ford, Bradley A.; Klutts, J. Stacey; Jensen, Chris S.; Briggs, Angela S.; Robinson, Robert A.; Bruch, Leslie A.; Karandikar, Nitin J.

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output. PMID:28913416

  7. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship.

    PubMed

    Krasowski, Matthew D; Ford, Bradley A; Klutts, J Stacey; Jensen, Chris S; Briggs, Angela S; Robinson, Robert A; Bruch, Leslie A; Karandikar, Nitin J

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output.

  8. Alkaloid-Derived Thioureas in Asymmetric Organocatalysis: A Cooperative Learning Activity in a Project-Based Laboratory Course

    ERIC Educational Resources Information Center

    Monge, David

    2015-01-01

    An experiment carried out by advanced undergraduate students in a project-based laboratory course is described. Taking into account the positive effects of working in teams, which has been key for successful research in industry and academia, a cooperative learning experience in the laboratory was developed. Students working in teams of four…

  9. 42 CFR 52h.10 - What matters must be reviewed for solicited contract proposals?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with respect to a contract project involving solicited contract proposals, unless the project concept... group has made recommendations concerning the scientific merit of the concept. (b) The awarding official... review of the project concept and the proposals has been completed. The request for proposals shall state...

  10. Georgia Species at Risk Project

    DTIC Science & Technology

    2009-06-01

    Robins, ten at Fort Stewart, and three at King’s Bay. GA-DNR contracted with the Natural Resources Spatial Analysis Laboratory (NARSAL) to produce...stagnant, tannin -stained waters in creeks and impoundments, especially in areas with heavy aquatic vegetation (Hoover et al. 1998). A management...was contracted to the Natural Resources Spatial Analysis Laboratory (NARSAL) at the University of Georgia, who previously completed mapping at a

  11. 24 CFR 983.205 - Term of HAP contract.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Term of HAP contract. 983.205 Section 983.205 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.205 Term of HAP...

  12. 24 CFR 983.205 - Term of HAP contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Term of HAP contract. 983.205 Section 983.205 Housing and Urban Development Regulations Relating to Housing and Urban Development... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.205 Term of HAP...

  13. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on highmore » fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.« less

  14. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement contracts and... PROJECTS Program Requirements § 422.9 Reclamation law enforcement contracts and cooperative agreements. (a... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation law...

  15. Contracting with the Frederick National Laboratory | Frederick National Laboratory for Cancer Research

    Cancer.gov

    Our Acquisitions Directorate supports the national laboratory with high quality products and services to achieve its national mission. In addition to engaging large subcontractors, we are also committed to working with small businesses, minority- and

  16. 48 CFR 970.1504-1-3 - Special considerations: Laboratory management and operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: Laboratory management and operation. 970.1504-1-3 Section 970.1504-1-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-3 Special considerations: Laboratory management and operation. (a) For the management...

  17. Multiweek cell culture project for use in upper-level biology laboratories.

    PubMed

    Marion, Rebecca E; Gardner, Grant E; Parks, Lisa D

    2012-06-01

    This article describes a laboratory protocol for a multiweek project piloted in a new upper-level biology laboratory (BIO 426) using cell culture techniques. Human embryonic kidney-293 cells were used, and several culture media and supplements were identified for students to design their own experiments. Treatments included amino acids, EGF, caffeine, epinephrine, heavy metals, and FBS. Students researched primary literature to determine their experimental variables, made their own solutions, and treated their cells over a period of 2 wk. Before this, a sterile technique laboratory was developed to teach students how to work with the cells and minimize contamination. Students designed their experiments, mixed their solutions, seeded their cells, and treated them with their control and experimental media. Students had the choice of manipulating a number of variables, including incubation times, exposure to treatment media, and temperature. At the end of the experiment, students observed the effects of their treatment, harvested and dyed their cells, counted relative cell numbers in control and treatment flasks, and determined the ratio of living to dead cells using a hemocytometer. At the conclusion of the experiment, students presented their findings in a poster presentation. This laboratory can be expanded or adapted to include additional cell lines and treatments. The ability to design and implement their own experiments has been shown to increase student engagement in the biology-related laboratory activities as well as develop the critical thinking skills needed for independent research.

  18. The Astronomy Collections: From the Project to the Laboratory

    NASA Astrophysics Data System (ADS)

    Bobis, L.

    2015-04-01

    Within some astronomical libraries, just as it is with other libraries, there are collections we might refer to as being in "the border zone." The materials most representative of this are those that relate to an institution's heritage and history. The challenges of these patrimonial collections are scientific, legal, economic, and political. These collections establish the scientific status of their respective libraries because they extend beyond meeting the needs of astronomers: the material is important in defining the history of the field. The influence of these libraries derives from these heritage materials. From this point of view, the library is a worksite and a laboratory for librarians, project managers, and researchers.

  19. Introduction of Special Physics Topics (Geophysics) Through the Use of Physics Laboratory Projects

    ERIC Educational Resources Information Center

    Parker, R. H.; Whittles, A. B. L.

    1970-01-01

    Describes the objectives and content of a physics laboratory program for freshman students at the British Columbia Institute of Technology. The first part of the program consists of basic physics experiments, while the second part emphasizes student work on projects in geophysics that have direct technical applications. (LC)

  20. CNR LARA project, Italy: Airborne laboratory for environmental research

    NASA Technical Reports Server (NTRS)

    Bianchi, R.; Cavalli, R. M.; Fiumi, L.; Marino, C. M.; Pignatti, S.

    1995-01-01

    The increasing interest for the environmental problems and the study of the impact on the environment due to antropic activity produced an enhancement of remote sensing applications. The Italian National Research Council (CNR) established a new laboratory for airborne hyperspectral imaging, the LARA Project (Laboratorio Aero per Ricerche Ambientali - Airborne Laboratory for Environmental Research), equipping its airborne laboratory, a CASA-212, mainly with the Daedalus AA5000 MIVIS (Multispectral Infrared and Visible Imaging Spectrometer) instrument. MIVIS's channels, spectral bandwidths, and locations are chosen to meet the needs of scientific research for advanced applications of remote sensing data. MIVIS can make significant contributions to solving problems in many diverse areas such as geologic exploration, land use studies, mineralogy, agricultural crop studies, energy loss analysis, pollution assessment, volcanology, forest fire management and others. The broad spectral range and the many discrete narrow channels of MIVIS provide a fine quantization of spectral information that permits accurate definition of absorption features from a variety of materials, allowing the extraction of chemical and physical information of our environment. The availability of such a hyperspectral imager, that will operate mainly in the Mediterranean area, at the present represents a unique opportunity for those who are involved in environmental studies and land-management to collect systematically large-scale and high spectral-spatial resolution data of this part of the world. Nevertheless, MIVIS deployments will touch other parts of the world, where a major interest from the international scientific community is present.

  1. Sandia National Laboratories site-wide hydrogeologic characterization project calendar year 1992 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crowson, D.; Gibson, J.D.; Haase, C.S.

    1993-10-01

    The Sandia National Laboratories, New Mexico (SNL/NM) Site-Wide Hydrogeologic Characterization (SWHC) project has been implemented as part of the SNL/NM Environmental Restoration (ER) Program to develop the regional hydrogeologic framework and baseline for the approximately 100 mi of Kirtland Air Force Base (KAFB) and adjacent withdrawn public lands upon which SNL/NM has performed research and development activities. Additionally, the SWHC project will investigate and characterize generic hydrogeologic issues associated with the 172 ER sites owned by SNL/NM across its facilities on KAFB. As called for in the Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation and Recovery Actmore » (RCRA) Part B permit agreement between the U.S. Environmental Protection Agency (EPA) as the permitter and the U.S. Department of Energy (DOE) and SNL/NM as the permittees, an annual report is to be prepared by the SWHC project team. This document serves two primary purposes: (1) to identify and describe the conceptual framework for the hydrogeologic system underlying SNL/NM and (2) to describe characterization activities undertaken in the preceding year that add to our understanding (reduce our uncertainties) regarding the conceptual and quantitative hydrogeologic framework. This SWHC project annual report focuses primarily on purpose 1, providing a summary description of the current {open_quotes}state of knowledge{close_quotes} of the Sandia National Laboratories/Kirtland Air Force Base (SNL/KAFB) hydrogeologic setting.« less

  2. Complementary Spectroscopic Assays for Investigating Protein-Ligand Binding Activity: A Project for the Advanced Chemistry Laboratory

    ERIC Educational Resources Information Center

    Mascotti, David P.; Waner, Mark J.

    2010-01-01

    A protein-ligand binding, guided-inquiry laboratory project with potential application across the advanced undergraduate curriculum is described. At the heart of the project are fluorescence and spectrophotometric assays utilizing biotin-4-fluorescein and streptavidin. The use of the same stock solutions for an assay that may be examined by two…

  3. 42 CFR 67.103 - Peer review of contract proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 67.103 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING AGENCY FOR HEALTH CARE POLICY AND RESEARCH GRANTS AND CONTRACTS Peer Review of Contracts for Health Services Research, Evaluation, Demonstration, and Dissemination Projects § 67.103 Peer...

  4. From Organelle to Protein Gel: A 6-Wk Laboratory Project on Flagellar Proteins

    ERIC Educational Resources Information Center

    Mitchell, Beth Ferro; Graziano, Mary R.

    2006-01-01

    Research suggests that undergraduate students learn more from lab experiences that involve longer-term projects. We have developed a one-semester laboratory sequence aimed at sophomore-level undergraduates. In designing this curriculum, we focused on several educational objectives: 1) giving students a feel for the scientific research process, 2)…

  5. Evaluation of contract time estimation and contracting procedures for louisiana department of transportation and development construction projects : final report : volume I.

    DOT National Transportation Integrated Search

    1995-09-11

    The purpose of the research was to provide the Louisiana Department of Transportation and Development (LaDOTD) with a systematic approach to the determination of contract time and to explore innovative contracting procedures that may prove beneficial...

  6. 41 CFR 101-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Laboratory and research...-General Policies § 101-25.109 Laboratory and research equipment. (a) This section prescribes controls for use by Federal agencies in managing laboratory and research equipment in Federal laboratories...

  7. 41 CFR 101-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Laboratory and research...-General Policies § 101-25.109 Laboratory and research equipment. (a) This section prescribes controls for use by Federal agencies in managing laboratory and research equipment in Federal laboratories...

  8. 41 CFR 101-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Laboratory and research...-General Policies § 101-25.109 Laboratory and research equipment. (a) This section prescribes controls for use by Federal agencies in managing laboratory and research equipment in Federal laboratories...

  9. Hot Corrosion Test Facility at the NASA Lewis Special Projects Laboratory

    NASA Technical Reports Server (NTRS)

    Robinson, Raymond C.; Cuy, Michael D.

    1994-01-01

    The Hot Corrosion Test Facility (HCTF) at the NASA Lewis Special Projects Laboratory (SPL) is a high-velocity, pressurized burner rig currently used to evaluate the environmental durability of advanced ceramic materials such as SiC and Si3N4. The HCTF uses laboratory service air which is preheated, mixed with jet fuel, and ignited to simulate the conditions of a gas turbine engine. Air, fuel, and water systems are computer-controlled to maintain test conditions which include maximum air flows of 250 kg/hr (550 lbm/hr), pressures of 100-600 kPa (1-6 atm), and gas temperatures exceeding 1500 C (2732 F). The HCTF provides a relatively inexpensive, yet sophisticated means for researchers to study the high-temperature oxidation of advanced materials, and the injection of a salt solution provides the added capability of conducting hot corrosion studies.

  10. LABORATORY MISCONDUCT - WHAT CAN HAPPEN TO YOU?

    EPA Science Inventory

    Contracted laboratories perform a vast number of routine and special analytical services that are the foundation of decisions upon which rests the fate of the environment. Guiding these laboratories in the generation of environmental data has been the analytical protocols and ...

  11. CACAO: A project for a laboratory for the production and characterization of thin radioactive layers

    NASA Astrophysics Data System (ADS)

    Bacri, C. O.; Petitbon, V.; Pierre, S.; Cacao Group

    2010-02-01

    CACAO, Chimie des Actinides et Cibles radioActives à Orsay (actinide chemistry and radioactive targets at Orsay), is a project under construction that consists of the installation of a hot laboratory dedicated to the production and characterization of thin radioactive layers. The project aims to be a joint CNRS-CEA national laboratory to overcome difficulties related mainly to safety issues and to the lack of knowledge and potential manpower. The first goal is to fulfill, at least, the needs of the whole French community, and to be able to coordinate the different activities related to radioactive targets. For this purpose, itis important to be complementary to already existing international installations. Inside this framework, it will of course be possible to produce and/or characterize targets for other users.

  12. FHWA Federal-Aid ITS Procurement Regulations and Contracting Options

    DOT National Transportation Integrated Search

    1997-10-01

    State and local agencies planning to procure Intelligent Transportation Systems (ITS) projects with Federal highway funds face unique challenges. They must choose appropriate contracting techniques that optimize project quality and cost while meeting...

  13. Development of the Design Laboratory.

    ERIC Educational Resources Information Center

    Silla, Harry

    1986-01-01

    Describes the design laboratory at the Stevens Institute of Technology (SIT). Considers course objectives, design projects, project structure, mechanical design, project management, and laboratory operation. This laboratory complements SIT's course in process design, giving students a complete design experience. (JN)

  14. Summary of Environmental Data Analysis and Work Performed by Lawrence Livermore National Laboratory (LLNL) in Support of the Navajo Nation Abandoned Mine Lands Project at Tse Tah, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taffet, Michael J.; Esser, Bradley K.; Madrid, Victor M.

    This report summarizes work performed by Lawrence Livermore National Laboratory (LLNL) under Navajo Nation Services Contract CO9729 in support of the Navajo Abandoned Mine Lands Reclamation Program (NAMLRP). Due to restrictions on access to uranium mine waste sites at Tse Tah, Arizona that developed during the term of the contract, not all of the work scope could be performed. LLNL was able to interpret environmental monitoring data provided by NAMLRP. Summaries of these data evaluation activities are provided in this report. Additionally, during the contract period, LLNL provided technical guidance, instructional meetings, and review of relevant work performed by NAMLRPmore » and its contractors that was not contained in the contract work scope.« less

  15. Laboratory Directed Research and Development Program Activities for FY 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newman,L.

    2007-12-31

    Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory that carries out basic and applied research in the physical, biomedical, and environmental sciences, and in selected energy technologies. It is managed by Brookhaven Science Associates, LLC, (BSA) under contract with the U. S. Department of Energy (DOE). BNL's Fiscal year 2007 budget was $515 million. There are about 2,600 employees, and another 4,500 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annuallymore » in March, as required by DOE Order 413.2B, 'Laboratory Directed Research and Development', April 19, 2006, and the Roles, Responsibilities, and Guidelines for Laboratory Directed Research and Development at the Department of Energy/National Nuclear Security Administration Laboratories dated June 13, 2006. In accordance this is our Annual Report in which we describe the Purpose, Approach, Technical Progress and Results, and Specific Accomplishments of all LDRD projects that received funding during Fiscal Year 2007. The goals and objectives of BNL's LDRD Program can be inferred from the Program's stated purposes. These are to (1) encourage and support the development of new ideas and technology, (2) promote the early exploration and exploitation of creative and innovative concepts, and (3) develop new 'fundable' R&D projects and programs. The emphasis is clearly articulated by BNL to be on supporting exploratory research 'which could lead to new programs, projects, and directions' for the Laboratory. We explicitly indicate that research conducted under the LDRD Program should be highly innovative, and an element of high risk as to success is acceptable. In the solicitation for new proposals for Fiscal Year 2007 we especially requested innovative new projects in support of RHIC and the Light Source and

  16. Pension fund activities at Department laboratories managed by the University of California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-18

    The Department of Energy`s (Department) Office of Contractor Human Resource Management, and San Francisco and Albuquerque Field Offices have responsibility for contract administration of the Department`s interest in two separate pension plans covering University of California (University) employees at Lawrence Livermore National Laboratory, Lawrence Berkeley Laboratory, and Los Alamos National Laboratory. The purpose of the audit was to review the Department`s contract administration of its interest in those pension plans.

  17. Synthesis of Two Local Anesthetics from Toluene: An Organic Multistep Synthesis in a Project-Oriented Laboratory Course

    ERIC Educational Resources Information Center

    Demare, Patricia; Regla, Ignacio

    2012-01-01

    This article describes one of the projects in the advanced undergraduate organic chemistry laboratory course concerning the synthesis of two local anesthetic drugs, prilocaine and benzocaine, with a common three-step sequence starting from toluene. Students undertake, in a several-week independent project, the multistep synthesis of a…

  18. Laboratory performance in the Sediment Laboratory Quality-Assurance Project, 1996-98

    USGS Publications Warehouse

    Gordon, John D.; Newland, Carla A.; Gagliardi, Shane T.

    2000-01-01

    Analytical results from all sediment quality-control samples are compiled and statistically summarized by the USGS, Branch of Quality Systems, both on an intra- and interlaboratory basis. When evaluating these data, the reader needs to keep in mind that every measurement has an error component associated with it. It is premature to use the data from the first five SLQA studies to judge any of the laboratories as performing in an unacceptable manner. There were, however, some notable differences in the results for the 12 laboratories that participated in the five SLQA studies. For example, the overall median percent difference for suspended-sediment concentration on an individual laboratory basis ranged from –18.04 to –0.33 percent. Five of the 12 laboratories had an overall median percent difference for suspended-sediment concentration of –2.02 to –0.33 percent. There was less variability in the median difference for the measured fine-size material mass. The overall median percent difference for fine-size material mass ranged from –10.11 to –4.27 percent. Except for one laboratory, the median difference for fine-size material mass was within a fairly narrow range of –6.76 to –4.27 percent. The median percent difference for sand-size material mass differed among laboratories more than any other physical sediment property measured in the study. The overall median percent difference for the sand-size material mass ranged from –1.49 percent to 26.39 percent. Five of the nine laboratories that do sand/fine separations had overall median percent differences that ranged from –1.49 to 2.98 percent for sand-size material mass. Careful review of the data reveals that certain laboratories consistently produced data within statistical control limits for some or all of the physical sediment properties measured in this study, whereas other laboratories occasionally produced data that exceeded the control limits.

  19. 77 FR 65395 - Notice of Submission of Proposed Information Collection to OMB: Section 8 Contract Renewal Policy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... Project- Based Section 8 Contracts AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice... through the use of appropriate automated collection techniques or other forms of information technology, e... Section 8 project-based assistance contracts are renewed. The Section 8 contract renewal process is an...

  20. A Study of the Clinical Laboratory Occupations. The UCLA Allied Health Professions Project.

    ERIC Educational Resources Information Center

    California Univ., Los Angeles. Div. of Vocational Education.

    The objectives of this study which was conducted as part of the UCLA Allied Health Professions Project were: (1) to determine the percent of medical laboratory workers who perform a comprehensive list of tasks and procedures; (2) to evaluate this performance in terms of certification and specialty area; and (3) on the basis of these data, to make…

  1. 24 CFR 884.120 - Responsibility for contract administration and defaults (private-owner/PHA projects).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the Contract, subject to review and audit by HUD. (b) Defaults by PHA and/or owner. (1) The ACC and... assure that the obligations of the PHA to the Owner are carried out. (2) The ACC shall contain a... accordance with the terms of the ACC and the Contract. (3) The Contract shall contain a provision to the...

  2. 24 CFR 884.120 - Responsibility for contract administration and defaults (private-owner/PHA projects).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the Contract, subject to review and audit by HUD. (b) Defaults by PHA and/or owner. (1) The ACC and... assure that the obligations of the PHA to the Owner are carried out. (2) The ACC shall contain a... accordance with the terms of the ACC and the Contract. (3) The Contract shall contain a provision to the...

  3. Analysis of Air Force Secondary Power Logistics Solution Contract

    DTIC Science & Technology

    2010-05-21

    IL 62225 SUBJECT: Audit. Analysis of Air Force Secondary Power Logistics Solution Contract, 748th Supply Chain Management Group, Hill Air Fon:r... Power Logis.tics Solution Contnict. 748111 Supply Ch.,in Management Group. !-lill Air FOfC! BII.SI!, UT (Project 02009· DOOOCH·0213.000) I. AUlIctlcd...00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Analysis of Air Force Secondary Power Logistics Solution Contract 5a. CONTRACT NUMBER 5b. GRANT

  4. Network Science Research Laboratory (NSRL) Discrete Event Toolkit

    DTIC Science & Technology

    2016-01-01

    ARL-TR-7579 ● JAN 2016 US Army Research Laboratory Network Science Research Laboratory (NSRL) Discrete Event Toolkit by...Laboratory (NSRL) Discrete Event Toolkit by Theron Trout and Andrew J Toth Computational and Information Sciences Directorate, ARL...Research Laboratory (NSRL) Discrete Event Toolkit 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Theron Trout

  5. 24 CFR 883.603 - Term of contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., guaranteed or intended for purchase by the Federal government and for assisted units in newly constructed manufactured home parks, the term of the Contract will be 20 years. (2) For assisted units in a project owned... following provisions: (1) For assisted units in a project financed with the aid of a loan insured by the...

  6. 24 CFR 883.603 - Term of contract.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., guaranteed or intended for purchase by the Federal government and for assisted units in newly constructed manufactured home parks, the term of the Contract will be 20 years. (2) For assisted units in a project owned... following provisions: (1) For assisted units in a project financed with the aid of a loan insured by the...

  7. 24 CFR 883.603 - Term of contract.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., guaranteed or intended for purchase by the Federal government and for assisted units in newly constructed manufactured home parks, the term of the Contract will be 20 years. (2) For assisted units in a project owned... following provisions: (1) For assisted units in a project financed with the aid of a loan insured by the...

  8. 24 CFR 883.603 - Term of contract.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., guaranteed or intended for purchase by the Federal government and for assisted units in newly constructed manufactured home parks, the term of the Contract will be 20 years. (2) For assisted units in a project owned... following provisions: (1) For assisted units in a project financed with the aid of a loan insured by the...

  9. 24 CFR 883.603 - Term of contract.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., guaranteed or intended for purchase by the Federal government and for assisted units in newly constructed manufactured home parks, the term of the Contract will be 20 years. (2) For assisted units in a project owned... following provisions: (1) For assisted units in a project financed with the aid of a loan insured by the...

  10. Pacific Northwest National Laboratory Apatite Investigation at the 100-NR-2 Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the 100-NR-2 Apatite Project. The U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N would include apatite sequestration as the primary treatment, followed by a secondary treatment. The scope of this project covers the technical support needed before, during, and after treatment of the targeted subsurface environment using a new high-concentration formulation.

  11. New Ideas for an Old Enzyme: A Short, Question-Based Laboratory Project for the Purification and Identification of an Unknown LDH Isozyme

    ERIC Educational Resources Information Center

    Coleman, Aaron B.

    2010-01-01

    Enzyme purification projects are an excellent way to introduce many aspects of protein biochemistry, but can be difficult to carry out under the constraints of a typical undergraduate laboratory course. We have designed a short laboratory project for the purification and identification of an "unknown" lactate dehydrogenase (LDH) isozyme that can…

  12. Bigelow BEAM Contract

    NASA Image and Video Library

    2013-01-16

    NASA Deputy Administrator Lori Garver and President and founder of Bigelow Aerospace Robert T. Bigelow, announce a planned addition to the International Space Station that will use the orbiting laboratory to test expandable space habitat technology during a press conference held at Bigelow Aerospace on Wednesday, Jan. 16, 2013 in Las Vegas. The $17.8 million contract with Bigelow Aerospace will provide a Bigelow Expandable Activity Module (BEAM), which is scheduled to arrive at the space station in 2015 for a two-year technology demonstration. Photo Credit: (NASA/Bill Ingalls)

  13. But I'm an engineer—not a contracts lawyer!

    NASA Astrophysics Data System (ADS)

    Warner, Mark; Bass, Harvey

    2012-09-01

    Industrial partners, commercial vendors, and subsystem contractors play a large role in the design and construction of modern telescopes. Because many telescope projects carry relatively small staffs, engineers are often required to perform the additional functions of technical writing, cost estimating, and contract bidding and negotiating. The skills required to carry out these tasks are not normally taught in traditional engineering programs. As a result, engineers often learn to write Request for Proposals (RFPs), select vendors, and negotiate contracts by trial-and-error and/or by adapting previous project documents to match their own requirements. Typically, this means that at the end of a contract the engineer has a large list of do's, don'ts, and lessons learned for the next RFP he or she must generate. This paper will present one such engineer's experience writing and bidding proposal packages for large telescope components and subsystems. Included are: thoughts on structuring SOWs, Specs, ICDs, and other RFP documents; modern methods for bidding the work; and systematic means for selecting and negotiating with a contractor to arrive at the best value for the project.

  14. The Weyl law for contractive maps

    NASA Astrophysics Data System (ADS)

    Spina, Maria E.; Rivas, Alejandro M. F.; Carlo, Gabriel

    2013-11-01

    We find an empirical Weyl law followed by the eigenvalues of contractive maps. An important property is that it is mainly insensitive to the dimension of the corresponding invariant classical set, the strange attractor. The usual explanation for the fractal Weyl law emergence in scattering systems (i.e., having a projective opening) is based on the classical phase space distributions evolved up to the quantum to classical correspondence (Ehrenfest) time. In the contractive case this reasoning fails to describe it. Instead, we conjecture that the support for this behavior is essentially given by the strong non-orthogonality of the eigenvectors of the contractive superoperator. We test the validity of the Weyl law and this conjecture on two paradigmatic systems, the dissipative baker and kicked top maps.

  15. Environmental Regulation of Plant Gene Expression: An Rt-qPCR Laboratory Project for an Upper-Level Undergraduate Biochemistry or Molecular Biology Course

    ERIC Educational Resources Information Center

    Eickelberg, Garrett J.; Fisher, Alison J.

    2013-01-01

    We present a novel laboratory project employing "real-time" RT-qPCR to measure the effect of environment on the expression of the "FLOWERING LOCUS C" gene, a key regulator of floral timing in "Arabidopsis thaliana" plants. The project requires four 3-hr laboratory sessions and is aimed at upper-level undergraduate…

  16. Teaching Protein Purification and Characterization Techniques: A Student-Initiated, Project-Oriented Biochemistry Laboratory Course

    ERIC Educational Resources Information Center

    MacDonald, Gina

    2008-01-01

    This report describes a biochemistry laboratory that is completely project-oriented. Upper-level biology and chemistry majors work in teams to purify a protein of their choice. After the student groups have completed literature searches, ordered reagents, and made buffers they continue to learn basic protein purification and biochemical techniques…

  17. 41 CFR 101-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipped and/or used for scientific research, testing, or analysis, except clinical laboratories operating... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Laboratory and research...-General Policies § 101-25.109 Laboratory and research equipment. (a) This section prescribes controls for...

  18. Port Granby Project Overview - 13208

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, David W.; Vandergaast, Gary; Sungaila, Mark

    2013-07-01

    The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Projectmore » was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)« less

  19. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT ANNUAL REPORT TO THE DEPARTMENT OF ENERGY - DECEMBER 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FOX, K.J.

    Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory that carries out basic and applied research in the physical, biomedical, and environmental sciences, and in selected energy technologies. It is managed by Brookhaven Science Associates, LLC, (BSA) under contract with the U. S. Department of Energy (DOE). BNL's total annual budget has averaged about $460 million. There are about 2,500 employees, and another 4,500 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE)more » annually in March, as required by DOE Order 413.2B, ''Laboratory Directed Research and Development,'' April 19, 2006, and the Roles, Responsibilities, and Guidelines for Laboratory Directed Research and Development at the Department of Energy National Nuclear Security Administration Laboratories dated June 13, 2006. In accordance this is our Annual Report in which we describe the Purpose, Approach, Technical Progress and Results, and Specific Accomplishments of all LDRD projects that received funding during Fiscal Year 2006.« less

  20. An efficient field and laboratory workflow for plant phylotranscriptomic projects1

    PubMed Central

    Yang, Ya; Moore, Michael J.; Brockington, Samuel F.; Timoneda, Alfonso; Feng, Tao; Marx, Hannah E.; Walker, Joseph F.; Smith, Stephen A.

    2017-01-01

    Premise of the study: We describe a field and laboratory workflow developed for plant phylotranscriptomic projects that involves cryogenic tissue collection in the field, RNA extraction and quality control, and library preparation. We also make recommendations for sample curation. Methods and Results: A total of 216 frozen tissue samples of Caryophyllales and other angiosperm taxa were collected from the field or botanical gardens. RNA was extracted, stranded mRNA libraries were prepared, and libraries were sequenced on Illumina HiSeq platforms. These included difficult mucilaginous tissues such as those of Cactaceae and Droseraceae. Conclusions: Our workflow is not only cost effective (ca. $270 per sample, as of August 2016, from tissue to reads) and time efficient (less than 50 h for 10–12 samples including all laboratory work and sample curation), but also has proven robust for extraction of difficult samples such as tissues containing high levels of secondary compounds. PMID:28337391

  1. 2017 GTO Project review Laboratory Evaluation of EGS Shear Stimulation.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bauer, Stephen J.

    The objectives and purpose of this research has been to produce laboratory-based experimental and numerical analyses to provide a physics-based understanding of shear stimulation phenomena (hydroshearing) and its evolution during stimulation. Water was flowed along fractures in hot and stressed fractured rock, to promote slip. The controlled laboratory experiments provide a high resolution/high quality data resource for evaluation of analysis methods developed by DOE to assess EGS “behavior” during this stimulation process. Segments of the experimental program will provide data sets for model input parameters, i.e., material properties, and other segments of the experimental program will represent small scale physicalmore » models of an EGS system, which may be modeled. The coupled lab/analysis project has been a study of the response of a fracture in hot, water-saturated fractured rock to shear stress experiencing fluid flow. Under this condition, the fracture experiences a combination of potential pore pressure changes and fracture surface cooling, resulting in slip along the fracture. The laboratory work provides a means to assess the role of “hydroshearing” on permeability enhancement in reservoir stimulation. Using the laboratory experiments and results to define boundary and input/output conditions of pore pressure, thermal stress, fracture shear deformation and fluid flow, and models were developed and simulations completed by the University of Oklahoma team. The analysis methods are ones used on field scale problems. The sophisticated numerical models developed contain parameters present in the field. The analysis results provide insight into the role of fracture slip on permeability enhancement-“hydroshear” is to be obtained. The work will provide valuable input data to evaluate stimulation models, thus helping design effective EGS.« less

  2. 48 CFR 1552.223-72 - Care of laboratory animals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Care of laboratory animals... Care of laboratory animals. As prescribed in 1523.303-72, insert the following clause: Care of Laboratory Animals (OCT 2000) (a) Before undertaking performance of any contract involving the use of...

  3. 48 CFR 1552.223-72 - Care of laboratory animals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Care of laboratory animals... Care of laboratory animals. As prescribed in 1523.303-72, insert the following clause: Care of Laboratory Animals (OCT 2000) (a) Before undertaking performance of any contract involving the use of...

  4. 48 CFR 1552.223-72 - Care of laboratory animals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Care of laboratory animals... Care of laboratory animals. As prescribed in 1523.303-72, insert the following clause: Care of Laboratory Animals (OCT 2000) (a) Before undertaking performance of any contract involving the use of...

  5. 48 CFR 1552.223-72 - Care of laboratory animals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Care of laboratory animals... Care of laboratory animals. As prescribed in 1523.303-72, insert the following clause: Care of Laboratory Animals (OCT 2000) (a) Before undertaking performance of any contract involving the use of...

  6. 48 CFR 1552.223-72 - Care of laboratory animals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Care of laboratory animals... Care of laboratory animals. As prescribed in 1523.303-72, insert the following clause: Care of Laboratory Animals (OCT 2000) (a) Before undertaking performance of any contract involving the use of...

  7. 41 CFR 109-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Laboratory and research equipment. 109-25.109 Section 109-25.109 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND...

  8. 48 CFR 2015.209-70 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 2052.215-71, Project Officer Authority in applicable solicitations and contracts for cost-reimbursement, cost-plus-fixed-fee, cost-plus-award-fee, cost sharing, labor-hour or time-and-materials, including... for cost type contracts; (2) Section 2052.215-75 Alternate 1 may be used for all solicitations for...

  9. Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals. Because project funding tools are complex, federal agencies should seek project assistance before making final decisions. High capital requirements combined with limits on federal agency energy contracts create challenges for funding solar projects. Solar developers typically require long-term contracts (15-20) years to spread outmore » the initial investment and to enable payments similar to conventional utility bill payments. In the private sector, 20-year contracts have been developed, vetted, and accepted, but the General Services Administration (GSA) contract authority (federal acquisition regulation [FAR] part 41) typically limits contract terms to 10 years. Payments on shorter-term contracts make solar economically unattractive compared with conventional generation. However, in several instances, the federal sector has utilized innovative funding tools that allow long-term contracts or has created a project package that is economically attractive within a shorter contract term.« less

  10. The NASA-Lewis/ERDA solar heating and cooling technology program. [project planning/energy policy

    NASA Technical Reports Server (NTRS)

    Couch, J. P.; Bloomfield, H. S.

    1975-01-01

    Plans by NASA to carry out a major role in a solar heating and cooling program are presented. This role would be to create and test the enabling technology for future solar heating, cooling, and combined heating/cooling systems. The major objectives of the project are to achieve reduction in solar energy system costs, while maintaining adequate performance, reliability, life, and maintenance characteristics. The project approach is discussed, and will be accomplished principally by contract with industry to develop advanced components and subsystems. Advanced hardware will be tested to establish 'technology readiness' both under controlled laboratory conditions and under real sun conditions.

  11. The Astronautics Laboratory of the Air Force Systems Command electric propulsion projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanks, T.M.; Andrews, J.C.

    1989-01-01

    Ongoing projects at the Astronautics Laboratory (AL) of the USAF Systems Command are described. Particular attention is given to experiments with arcjets, magnetoplasmadynamic thrusters, ion engines, and the Electric Insertion Transfer Experiment (ELITE). ELITE involves the integration of high-power ammonia arcjets, low-power xenon ion thrusters, advanced photovoltaic solar arrays, and an autononomous flight control system. It is believed that electric propulsion will become a dominant element in the military and industrial use of space. 6 refs.

  12. Integrated, automated revenue management for managed care contracts.

    PubMed

    Burckhart, Kent

    2002-04-01

    Faced with increasing managed care penetration and declining net revenue in recent years, healthcare providers increasingly are emphasizing revenue management. To streamline processes and reduce costs in this area, many healthcare providers have implemented or are considering automated contract management systems. When selecting such a system, healthcare financial managers should make certain that the system can interface with both patient-accounting and decision-support systems of the organization. This integration enhances a healthcare provider's financial viability by providing integrated revenue-management capabilities to analyze projected performance of proposed managed care contracts and actual performance of existing contracts.

  13. Six Strategies for Chemical Waste Minimization in Laboratories.

    ERIC Educational Resources Information Center

    Matteson, Gary C.; Hadley, Cheri R.

    1991-01-01

    Guidelines are offered to research administrators for reducing the volume of hazardous laboratory waste. Suggestions include a chemical location inventory, a chemical reuse facility, progressive contracts with chemical suppliers, internal or external chemical recycling mechanisms, a "chemical conservation" campaign, and laboratory fees for…

  14. Contract Audit Followup: Its Impact on Defense Contracting.

    DTIC Science & Technology

    1983-12-01

    NOTES Contract Auditor Disposition of Contract Audit Reports Contracting Officer Independent Role of Contracting Officer Contract Audit Report Overaged...fundamental shift in the relationship between the contracting officer and contract auditor , strengthening the auditor’s role while eroding the...the indepen- .1 ident role of the contracting officer; (2) attracts unneces- sary attention to the contracting officer/ auditor relationship; (3) imposes

  15. 76 FR 66917 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... Office, 1955 Fremont Avenue, MS- 1203, Idaho Falls, Idaho 83415. Phone (208) 526-6518; Fax (208) 526... Treatment Project (AMWTP) Contract Idaho Cleanup Project (ICP) Contract Extension Idaho-EM Funding Status of...

  16. 48 CFR 352.270-5 - Care of laboratory animals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Care of laboratory animals... of laboratory animals. (a) As prescribed in 370.403(a), the Contracting Officer shall insert the... on Humane Care and Use of Laboratory Animals (January 2006) The Public Health Service (PHS) Policy on...

  17. 48 CFR 352.270-5 - Care of laboratory animals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Care of laboratory animals... of laboratory animals. (a) As prescribed in 370.403(a), the Contracting Officer shall insert the... on Humane Care and Use of Laboratory Animals (January 2006) The Public Health Service (PHS) Policy on...

  18. 48 CFR 352.270-5 - Care of laboratory animals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Care of laboratory animals... of laboratory animals. (a) As prescribed in 370.403(a), the Contracting Officer shall insert the... on Humane Care and Use of Laboratory Animals (January 2006) The Public Health Service (PHS) Policy on...

  19. 48 CFR 352.270-5 - Care of laboratory animals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Care of laboratory animals... of laboratory animals. (a) As prescribed in 370.403(a), the Contracting Officer shall insert the... on Humane Care and Use of Laboratory Animals (January 2006) The Public Health Service (PHS) Policy on...

  20. 48 CFR 352.270-5 - Care of laboratory animals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Care of laboratory animals... of laboratory animals. (a) As prescribed in 370.403(a), the Contracting Officer shall insert the... on Humane Care and Use of Laboratory Animals (January 2006) The Public Health Service (PHS) Policy on...

  1. Project resource reallocation algorithm

    NASA Technical Reports Server (NTRS)

    Myers, J. E.

    1981-01-01

    A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.

  2. Project-Based Learning in Undergraduate Environmental Chemistry Laboratory: Using EPA Methods to Guide Student Method Development for Pesticide Quantitation

    ERIC Educational Resources Information Center

    Davis, Eric J.; Pauls, Steve; Dick, Jonathan

    2017-01-01

    Presented is a project-based learning (PBL) laboratory approach for an upper-division environmental chemistry or quantitative analysis course. In this work, a combined laboratory class of 11 environmental chemistry students developed a method based on published EPA methods for the extraction of dichlorodiphenyltrichloroethane (DDT) and its…

  3. Evaluation of an LED Retrofit Project at Princeton University’s Carl Icahn Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, Robert G.; Murphy, Arthur L.; Perrin, Tess E.

    The LED lighting retrofit at the Carl Icahn Laboratory of the Lewis-Sigler Institute for Integrative Genomics was the first building-wide interior LED project at Princeton University, following the University’s experiences from several years of exterior and small-scale interior LED implementation projects. The project addressed three luminaire types – recessed 2x2 troffers, cove and other luminaires using linear T8 fluorescent lamps, and CFL downlights - which combined accounted for over 564,000 kWh of annual energy, over 90% of the lighting energy used in the facility. The Princeton Facilities Engineering staff used a thorough process of evaluating product alternatives before selecting anmore » acceptable LED retrofit solution for each luminaire type. Overall, 815 2x2 luminaires, 550 linear fluorescent luminaires, and 240 downlights were converted to LED as part of this project. Based solely on the reductions in wattage in converting from the incumbent fluorescent lamps to LED retrofit kits, the annual energy savings from the project was over 190,000 kWh, a savings of 37%. An additional 125,000 kWh of energy savings is expected from the implementation of occupancy and task-tuning control solutions, which will bring the total savings for the project to 62%.« less

  4. 7 CFR 1466.21 - Contract requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... environmental significance that include methane digesters, other innovative technologies, and projects that will... practices, consistent with the provisions of § 1466.25; (iv) Implement a comprehensive nutrient management plan when the EQIP contract includes an animal waste management facility; (v) Implement a forest...

  5. Lessons learned : pavement marking warranty contract.

    DOT National Transportation Integrated Search

    2013-12-01

    In 2012, UDOT implemented a performance-based warranty on a portion of an I-15 pavement marking : project. The awarded contract requested a contractor warranty on the implemented markings for a total : duration of six years. This is the first time th...

  6. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  7. Evaluation of an LED Retrofit Project at Princeton University's Carl Icahn Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, Robert; Murphy, Arthur; Perrin, Tess

    At Princeton University’s Carl Icahn Laboratory, DOE’s Commercial Buildings Integration Program documented the implementation of LED retrofit products for recessed troffers, linear cove lighting, and downlights – as part of Princeton’s first building-wide interior LED project. The conversion to LED enables more extensive use of lighting controls to tailor the lighting to the task and limit the operating hours based on occupancy, and the estimated energy savings including controls is 62% compared to the incumbent system.

  8. Publications of the JPL Solar Thermal Power Systems Project 1976 Through 1985

    NASA Technical Reports Server (NTRS)

    Panda, P. (Compiler); Gray, V. (Compiler); Marsh, C. (Compiler)

    1985-01-01

    Bibliographical listings are documentation products associated with the Solar Thermal Power Systems Project carried out by the Jet Propulsion Laboratory from 1976 to 1986. Documents are categorized as conference and journal papers, JPL external reports, JPL internal reports, or contractor reports (i.e., deliverable documents produced under contract to JPL). Alphabetical listings by titles are used in the bibliography itself to facilitate location of the document by subject. Two indexes are included for ease of reference; an author index; and a topical index.

  9. 41 CFR 109-25.109 - Laboratory and research equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Laboratory and research... PROCUREMENT 25-GENERAL 25.1-General Policies § 109-25.109 Laboratory and research equipment. The provisions of 41 CFR 101-25.109 and this section apply to laboratory and research equipment in the possession of...

  10. Medication monitoring and drug testing ethics project.

    PubMed

    Payne, Richard; Moe, Jeffrey L; Sevier, Catherine Harvey; Sevier, David; Waitzkin, Michael

    2015-01-01

    In 2012, Duke University initiated a research project, funded by an unrestricted research grant from Millennium Laboratories, a drug testing company. The project focused on assessing the frequency and nature of questionable, unethical, and illegal business practices in the clinical drug testing industry and assessing the potential for establishing a business code of ethics. Laboratory leaders, clinicians, industry attorneys, ethicists, and consultants participated in the survey, were interviewed, and attended two face-to-face meetings to discuss a way forward. The study demonstrated broad acknowledgment of variations in the legal and regulatory environment, resulting in inconsistent enforcement of industry practices. Study participants expressed agreement that overtly illegal practices sometimes exist, particularly when laboratory representatives and clinicians discuss reimbursement, extent of testing, and potential business incentives with medical practitioners. Most respondents reported directly observing probable violations involving marketing materials, contracts, or, in the case of some individuals, directly soliciting people with offers of clinical supplies and other "freebies." While many study respondents were skeptical that voluntary standards alone would eliminate questionable business practices, most viewed ethics codes and credentialing as an important first step that could potentially mitigate uneven enforcement, while improving quality of care and facilitating preferred payment options for credentialed parties. Many were willing to participate in future discussions and industry-wide initiatives to improve the environment.

  11. TRU waste absorbent addition project at the Idaho National Engineering and Environmental Laboratory.

    PubMed

    Colson, R Griff; Auman, Laurence E

    2003-08-01

    ABSTRACT In order to meet a commitment to ship 3,100 m3 of transuranic waste to the Waste Isolation Pilot Plant (WIPP), the Idaho National Engineering and Environmental Laboratory (INEEL) developed a process to add absorbent to TRU waste drums that did not meet WIPP waste acceptance criteria. The development, implementation, and safe completion of this project contributed to the INEEL's success in meeting the commitment three months early.

  12. Research and Development Project Selection Methods at the Air Force Wright Aeronautical Laboratories.

    DTIC Science & Technology

    1985-09-01

    personal and telephone interviews. Ten individuals from each of the four AFWAL Laboratories were interrviewed. The results illustrated that few of the...680). Aaker and Tyebee. 1978. The authors constructed a model that dealt with the selection of interdependent R&D projects. The model covers three...of this research effort. Scope * The data collection method used in this study consisted of a combination of personal and telephone interviews. The

  13. Report on the Project for Establishment of the Standardized Korean Laboratory Terminology Database, 2015.

    PubMed

    Jung, Bo Kyeung; Kim, Jeeyong; Cho, Chi Hyun; Kim, Ju Yeon; Nam, Myung Hyun; Shin, Bong Kyung; Rho, Eun Youn; Kim, Sollip; Sung, Heungsup; Kim, Shinyoung; Ki, Chang Seok; Park, Min Jung; Lee, Kap No; Yoon, Soo Young

    2017-04-01

    The National Health Information Standards Committee was established in 2004 in Korea. The practical subcommittee for laboratory test terminology was placed in charge of standardizing laboratory medicine terminology in Korean. We aimed to establish a standardized Korean laboratory terminology database, Korea-Logical Observation Identifier Names and Codes (K-LOINC) based on former products sponsored by this committee. The primary product was revised based on the opinions of specialists. Next, we mapped the electronic data interchange (EDI) codes that were revised in 2014, to the corresponding K-LOINC. We established a database of synonyms, including the laboratory codes of three reference laboratories and four tertiary hospitals in Korea. Furthermore, we supplemented the clinical microbiology section of K-LOINC using an alternative mapping strategy. We investigated other systems that utilize laboratory codes in order to investigate the compatibility of K-LOINC with statistical standards for a number of tests. A total of 48,990 laboratory codes were adopted (21,539 new and 16,330 revised). All of the LOINC synonyms were translated into Korean, and 39,347 Korean synonyms were added. Moreover, 21,773 synonyms were added from reference laboratories and tertiary hospitals. Alternative strategies were established for mapping within the microbiology domain. When we applied these to a smaller hospital, the mapping rate was successfully increased. Finally, we confirmed K-LOINC compatibility with other statistical standards, including a newly proposed EDI code system. This project successfully established an up-to-date standardized Korean laboratory terminology database, as well as an updated EDI mapping to facilitate the introduction of standard terminology into institutions. © 2017 The Korean Academy of Medical Sciences.

  14. Analysis of Expedited Defense Contracting Methods in the Acquisition of Emerging Technology

    DTIC Science & Technology

    2016-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT ANALYSIS OF EXPEDITED DEFENSE CONTRACTING METHODS IN THE...CONTRACTING METHODS IN THE ACQUISITION OF EMERGING TECHNOLOGY 5. FUNDING NUMBERS 6. AUTHOR(S) Jacob D. Sabin and Mark K. Zakner 7. PERFORMING...firms. The DOD has authority for applying non-traditional contracting methods to better adapt to this competitive marketplace. This project studied non

  15. Purification and Characterization of Taq Polymerase: A 9-Week Biochemistry Laboratory Project for Undergraduate Students

    ERIC Educational Resources Information Center

    Bellin, Robert M.; Bruno, Mary K.; Farrow, Melissa A.

    2010-01-01

    We have developed a 9-week undergraduate laboratory series focused on the purification and characterization of "Thermus aquaticus" DNA polymerase (Taq). Our aim was to provide undergraduate biochemistry students with a full-semester continuing project simulating a research-like experience, while having each week's procedure focus on a single…

  16. A Laboratory Experiment, Based on the Maillard Reaction, Conducted as a Project in Introductory Statistics

    ERIC Educational Resources Information Center

    Kravchuk, Olena; Elliott, Antony; Bhandari, Bhesh

    2005-01-01

    A simple laboratory experiment, based on the Maillard reaction, served as a project in Introductory Statistics for undergraduates in Food Science and Technology. By using the principles of randomization and replication and reflecting on the sources of variation in the experimental data, students reinforced the statistical concepts and techniques…

  17. Procurement and Contracting, Transportation & Public Facilities, State of

    Science.gov Websites

    Calendar Bid Opening Results Contract Award Status AASHTOWare Project Vendor List Contractor Bidding List Contractor Bidding Information Requests for Proposals Professional Services Request for Proposals

  18. NASA's In-Space Manufacturing Project: A Roadmap for a Multimaterial Fabrication Laboratory in Space

    NASA Technical Reports Server (NTRS)

    Prater, Tracie; Werkheiser, Niki; Ledbetter, Frank

    2017-01-01

    Human space exploration to date has been limited to low Earth orbit and the moon. The International Space Station (ISS) provides a unique opportunity for NASA to partner with private industry for development and demonstration of the technologies needed to support exploration initiatives. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing (ISM) project, its past and current activities (2014-2017), and how technologies under development will ultimately culminate in a multimaterial fabrication laboratory ("ISM FabLab") to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit, through a resupply launch or a return to earth, may instead result in a loss of mission while in transit to Mars. To have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The presentation provides a broad overview of ISM projects activities culminating with the Fabrication Laboratory for ISS. In 2017, the in-space manufacturing project issued a broad agency announcement for this capability. Requirements of the Fabrication Laboratory as stated in the solicitation will be discussed. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the current ISM FabLab will be tested on ISS, future systems are eventually intended for use in a deep space habitat or transit vehicle. The work of commercial companies funded under NASA's Small Business

  19. Performance Contracting and Energy Efficiency in the State Government Market

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bharvirkar, Ranjit; Goldman, Charles; Gilligan, Donald

    There is growing interest in energy efficiency (EE) among state policymakers as a result of increasing environmental concerns, rising electricity and natural gas prices, and lean economic times that motivate states to look more aggressively for cost-saving opportunities in public sector buildings. One logical place for state policymakers to demonstrate their commitment to energy efficiency is to 'lead by example' by developing and implementing strategies to reduce the energy consumption of state government facilities through investments in energy efficient technologies. Traditionally, energy efficiency improvements at state government facilities are viewed as a subset in the general category of building maintenancemore » and construction. These projects are typically funded through direct appropriations. However, energy efficiency projects are often delayed or reduced in scope whereby not all cost-effective measures are implemented because many states have tight capital budgets. Energy Savings Performance Contracting (ESPC) offers a potentially useful strategy for state program and facility managers to proactively finance and develop energy efficiency projects. In an ESPC project, Energy Service Companies (ESCOs) typically guarantee that the energy and cost savings produced by the project will equal or exceed all costs associated with implementing the project over the term of the contract. ESCOs typically provide turnkey design, installation, and maintenance services and also help arrange project financing. Between 1990 and 2006, U.S. ESCOs reported market activity of {approx}$28 Billion, with about {approx}75-80% of that activity concentrated in the institutional markets (K-12 schools, colleges/universities, state/local/federal government and hospitals). In this study, we review the magnitude of energy efficiency investment in state facilities and identify 'best practices' while employing performance contracting in the state government sector. The state

  20. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less

  1. Measurements with the TRITEL system in the Columbus Laboratory of the ISS

    NASA Astrophysics Data System (ADS)

    Hirn, Attila; Reitz, Guenther; Zabori, Balazs; Palfalvi, Jozsef K.; Burmeister, Soenke; Pazmandi, Tamas; Apathy, Istvan; Szanto, Peter; Deme, Sandor; Csoke, Antal

    In cooperation with BL-Electronics Ltd. a three-dimensional silicon detector telescope (TRITEL) was developed at MTA Centre for Energy Research (MTA EK, the former MTA KFKI Atomic Energy Research Institute) in the past years. The main objective of the instrument was to measure not only the absorbed dose in the cosmic radiation field, but also the linear energy (LET) spectrum of the charged particles and their average quality factor in three mutually orthogonal directions in order to give an estimation of the equivalent dose, too. In the frame of the EC project SURE the TRITEL system was delivered to the European Columbus Laboratory of the International Space Station (ISS) in October 31, 2012 and it was operated there between November 6, 2012 and May 10, 2013. Our presentation addresses the main characteristics of the TRITEL-SURE dosimetry system and the first measurement results obtained in the Columbus module. The TRITEL-SURE experiment is co-funded by the EC project SURE, contract number RITA-CT-2006-026069 and by the Government of Hungary through ESA Contracts 98057 and 4000108072/13/NL/KML under the PECS (Plan for European Cooperating States). The view expressed herein can in no way be taken to reflect the official opinion of the European Space Agency.

  2. 78 FR 46546 - Design-Build Contracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ...-0043] RIN 2125-AF58 Design-Build Contracting AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... alternative technical concepts (ATC) in design-build project delivery of highway construction. The revisions... design-build proposers to submit ATCs in their technical and price proposals. The FHWA seeks comments on...

  3. 10 CFR 609.13 - Principal and interest assistance contract.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Principal and interest assistance contract. 609.13 Section 609.13 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS LOAN GUARANTEES FOR PROJECTS... the non-guaranteed portion of the debt obligation, if any, and other debt obligations of the project...

  4. 10 CFR 609.13 - Principal and interest assistance contract.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Principal and interest assistance contract. 609.13 Section 609.13 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS LOAN GUARANTEES FOR PROJECTS... the non-guaranteed portion of the debt obligation, if any, and other debt obligations of the project...

  5. 10 CFR 609.13 - Principal and interest assistance contract.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Principal and interest assistance contract. 609.13 Section 609.13 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS LOAN GUARANTEES FOR PROJECTS... the non-guaranteed portion of the debt obligation, if any, and other debt obligations of the project...

  6. Laboratory Demonstrations for PDE and Metals Combustion at NASA MSFC's Advanced Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Report provides status reporting on activities under order no. H-30549 for the period December 1 through December 31, 1999. Details the activities of the contract in the coordination of planned conduct of experiments at the MSFC Advanced Propulsion Laboratory in pulse detonation MHD power production and metals combustion.

  7. Organic Analytical Service within the Superfund Contract Laboratory Program

    EPA Pesticide Factsheets

    This page contains information about the SOM02.4 statement of work for the analysis of organic compounds at hazardous waste sites. The SOW contains the analytical method and contractual requirements for laboratories.

  8. Special Education Teacher Computer Literacy Training. Project STEEL. A Special Project To Develop and Implement a Computer-Based Special Teacher Education and Evaluation Laboratory. Volume II. Final Report.

    ERIC Educational Resources Information Center

    Frick, Theodore W.; And Others

    The document is part of the final report on Project STEEL (Special Teacher Education and Evaluation Laboratory) intended to extend the utilization of technology in the training of preservice special education teachers. This volume focuses on the second of four project objectives, the development of a special education teacher computer literacy…

  9. Inorganic Analytical Service within the Superfund Contract Laboratory Program

    EPA Pesticide Factsheets

    This page contains information about the ISM02.4 statement of work for the analysis of metals and cyanide at hazardous waste sites. The SOW contains the analytical method and contractual requirements for laboratories.

  10. Strengthening district health service management and delivery through internal contracting: lessons from pilot projects in Cambodia.

    PubMed

    Khim, Keovathanak; Annear, Peter Leslie

    2013-11-01

    Following a decade of piloting different models of contracting, in mid-2009 the Cambodian Ministry of Health began to test a form of 'internal contracting' for health care delivery in selected health districts (including hospitals and health centers) contracted by the provincial health department as Special Operating Agencies (SOAs) and provided with greater management autonomy. This study assesses the internal contracting approach as a means for improving the management of district health services and strengthening service delivery. While the study may contribute to the emerging field now known as performance-based financing, the lessons deal more broadly with the impact of management reform and increased autonomy in contrast to traditional public sector line-management and budgeting. Carried out during 2011, the study was based on: (i) a review of the literature and of operational documents; (ii) primary data from semi-structured key informant interviews with 20 health officials in two provinces involved in four SOA pilot districts; and (iii) routine data from the 2011 SOA performance monitoring report. Five prerequisites were identified for effective contract management and improved service delivery: a clear understanding of roles and responsibilities by the contracting parties; implementation of clear rules and procedures; effective management of performance; effective monitoring of the contract; and adequate and timely provision of resources. Both the level and allocation of incentives and management bottlenecks at various levels continue to impede implementation. We conclude that, in contracted arrangements like these, the clear separation of contracting functions (purchasing, commissioning, monitoring and regulating), management autonomy where responsibilities are genuinely devolved and accepted, and the provision of resources adequate to meet contract demands are necessary conditions for success. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Students Dig Deep in the Mystery Soil Lab: A Playful, Inquiry-Based Soil Laboratory Project

    ERIC Educational Resources Information Center

    Thiet, Rachel K.

    2014-01-01

    The Mystery Soil Lab, a playful, inquiry-based laboratory project, is designed to develop students' skills of inquiry, soil analysis, and synthesis of foundational concepts in soil science and soil ecology. Student groups are given the charge to explore and identify a "Mystery Soil" collected from a unique landscape within a 10-mile…

  12. Imperatives for Effective Post-Conflict Reconstruction Contracting

    DTIC Science & Technology

    2007-03-15

    the transfer of authority from the CPA to the Interim Iraqi Government ( IIG ) in June 2004, the PMO was disestablished. All remaining DFI funds were...turned over the IIG . The Project and Contracting Office (PCO), another ad-hoc temporary organization was created and given the responsibility for...500K for division commanders with respective single transaction limits of $50K and $100K, respectively; weekly reporting; and for projects greater than

  13. Driving to contract management in health care institutes of developing countries.

    PubMed

    Vatankhah, S; Barati, O; Maleki, M R; Tofighi, Sh; Rafii, S

    2012-04-01

    Public hospitals can privatize management activities by contracting with a private organization or person to perform the work. Management contract is a method which uses private sector for major government projects like hospitals. This study evaluates contract management in health care institutes of developing countries. Information has been collected by reviewing the management contract condition of selected countries. Different forms of public private partnership for private participation in hospitals were surveyed. The effects of management contract is expanding market opportunities to include public sector clients, capturing a market to be protected from competitors and providing a reliable and timely source of revenue. Contracting with non-governmental entities will provide better results than government provision of the same services. Contracting initiatives must be regulated and monitored at the highest level of government by experienced and astute policy makers, economists and operational personnel.

  14. Laboratory Directed Research and Development Program Assessment for FY 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, J P; Fox, K J

    2008-03-31

    Brookhaven National Laboratory (BNL) is a multidisciplinary Laboratory that carries out basic and applied research in the physical, biomedical, and environmental sciences, and in selected energy technologies. It is managed by Brookhaven Science Associates, LLC, (BSA) under contract with the U. S. Department of Energy (DOE). BNL's Fiscal Year 2008 spending was $531.6 million. There are approximately 2,800 employees, and another 4,300 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annuallymore » in March, as required by DOE Order 413.2B, 'Laboratory Directed Research and Development,' April 19, 2006, and the Roles, Responsibilities, and Guidelines for Laboratory Directed Research and Development at the Department of Energy/National Nuclear Security Administration Laboratories dated June 13, 2006. The goals and objectives of BNL's LDRD Program can be inferred from the Program's stated purposes. These are to (1) encourage and support the development of new ideas and technology, (2) promote the early exploration and exploitation of creative and innovative concepts, and (3) develop new 'fundable' R&D projects and programs. The emphasis is clearly articulated by BNL to be on supporting exploratory research 'which could lead to new programs, projects, and directions' for the Laboratory. To be a premier scientific Laboratory, BNL must continuously foster groundbreaking scientific research and renew its research agenda. The competition for LDRD funds stimulates Laboratory scientists to think in new and creative ways, which becomes a major factor in achieving and maintaining research excellence and a means to address National needs within the overall mission of the DOE and BNL. By fostering high-risk, exploratory research, the LDRD program helps BNL to respond new scientific opportunities

  15. U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies

    DTIC Science & Technology

    2011-11-07

    Report No. DODIG-2012-017 November 7, 2011 U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies...Contracting and Gift Policies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...HERITAGE AND HISTORY COMMAND SUBJECT: U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies (Report No. DODIG-2012-017) We are

  16. A Guide to Educational Performance Contracting.

    ERIC Educational Resources Information Center

    Hall, G. R.; And Others

    This report is distilled from Rand's findings in previously reported research and from new research. It is addressed to school board members, administrators, and other educational decisionmakers who may be contemplating a performance contracting program. The guide follows the life cycle of a project and identifies the three major phases as…

  17. 42 CFR 52h.10 - What matters must be reviewed for solicited contract proposals?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false What matters must be reviewed for solicited contract proposals? 52h.10 Section 52h.10 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... CONTRACT PROJECTS § 52h.10 What matters must be reviewed for solicited contract proposals? (a) Subject to...

  18. Notification: Review of the Contract Management Assessment Program

    EPA Pesticide Factsheets

    Project #OA-FY14-0034, October 30, 2013. The Office of Inspector General plans to begin the preliminary research phase of an audit evaluating the Office of Acquisition Management’s Contract Management Assessment Program (CMAP).

  19. Safety in the Chemical Laboratory

    ERIC Educational Resources Information Center

    Steere, Norman V., Ed.

    1975-01-01

    The National Fire Protection Association has proposed national standards dealing with laboratory operations, ventilation, chemical handling and storage, compressed gases, fire prevention, and emergency procedures. The standards are likely to be used as guidelines by insurance companies, and governmental agencies that award grants and contracts for…

  20. Decreasing Skin Graft Contraction through Topical Wound Bed Preparation with Anti-Inflammatory Agents

    DTIC Science & Technology

    2016-10-01

    inflammatory agents - Wound healing -Contraction ACCOMPLISHMENTS: What were the major goals of the project? Develop treatments that modulate...1 AD _____________________ (Leave blank) Award Number: W81XWH-14-2-0153 TITLE: Decreasing Skin Graft Contraction through Topical Wound Bed...TYPE Annual 3. DATES COVERED (From - To) 15 Sep 2015 - 14 Sep 2016 4. TITLE AND SUBTITLE Decreasing Skin Graft Contraction through Topical Wound Bed

  1. National Water Quality Laboratory Profile

    USGS Publications Warehouse

    Raese, Jon W.

    1994-01-01

    The National Water Quality Laboratory determines organic and inorganic constituents in samples of surface and ground water, river and lake sediment, aquatic plant and animal material, and precipitation collected throughout the United States and its territories by the U.S. Geological Survey. In water year 1994, the Laboratory produced more than 900,000 analytical results for about 65,000 samples. The Laboratory also coordinates an extensive network of contract laboratories for the determination of radiochemical and stable isotopes and work for the U.S. Department of Defense Environmental Contamination Hydrology Program. Heightened concerns about water quality and about the possible effects of toxic chemicals at trace and ultratrace levels have contributed to an increased demand for impartial, objective, and independent data.

  2. Pension fund activities at Department laboratories managed by the University of California. [Contains Management and Auditor Comments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-18

    The Department of Energy's (Department) Office of Contractor Human Resource Management, and San Francisco and Albuquerque Field Offices have responsibility for contract administration of the Department's interest in two separate pension plans covering University of California (University) employees at Lawrence Livermore National Laboratory, Lawrence Berkeley Laboratory, and Los Alamos National Laboratory. The purpose of the audit was to review the Department's contract administration of its interest in those pension plans.

  3. Vertical and Horizontal Integration of Laboratory Curricula and Course Projects across the Electronic Engineering Technology Program

    ERIC Educational Resources Information Center

    Zhan, Wei; Goulart, Ana; Morgan, Joseph A.; Porter, Jay R.

    2011-01-01

    This paper discusses the details of the curricular development effort with a focus on the vertical and horizontal integration of laboratory curricula and course projects within the Electronic Engineering Technology (EET) program at Texas A&M University. Both software and hardware aspects are addressed. A common set of software tools are…

  4. The Advanced Interdisciplinary Research Laboratory: A Student Team Approach to the Fourth-Year Research Thesis Project Experience

    ERIC Educational Resources Information Center

    Piunno, Paul A. E.; Boyd, Cleo; Barzda, Virginijus; Gradinaru, Claudiu C.; Krull, Ulrich J.; Stefanovic, Sasa; Stewart, Bryan

    2014-01-01

    The advanced interdisciplinary research laboratory (AIRLab) represents a novel, effective, and motivational course designed from the interdisciplinary research interests of chemistry, physics, biology, and education development faculty members as an alternative to the independent thesis project experience. Student teams are assembled to work…

  5. Environmental regulation of plant gene expression: an RT-qPCR laboratory project for an upper-level undergraduate biochemistry or molecular biology course.

    PubMed

    Eickelberg, Garrett J; Fisher, Alison J

    2013-01-01

    We present a novel laboratory project employing "real-time" RT-qPCR to measure the effect of environment on the expression of the FLOWERING LOCUS C gene, a key regulator of floral timing in Arabidopsis thaliana plants. The project requires four 3-hr laboratory sessions and is aimed at upper-level undergraduate students in biochemistry or molecular biology courses. The project provides students with hands-on experience with RT-qPCR, the current "gold standard" for gene expression analysis, including detailed data analysis using the common 2-ΔΔCT method. Moreover, it provides a convenient starting point for many inquiry-driven projects addressing diverse questions concerning ecological biochemistry, naturally occurring genetic variation, developmental biology, and the regulation of gene expression in nature. Copyright © 2013 Wiley Periodicals, Inc.

  6. 48 CFR 22.404-5 - Expiration of project wage determinations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Expiration of project wage... Involving Construction 22.404-5 Expiration of project wage determinations. (a) The contracting officer shall make every effort to ensure that contract award is made before expiration of the project wage...

  7. A Project-Based Biochemistry Laboratory Promoting the Understanding and Uses of Fluorescence Spectroscopy in the Study of Biomolecular Structures and Interactions

    ERIC Educational Resources Information Center

    Briese, Nicholas; Jakubowsk, Henry V.

    2007-01-01

    A laboratory project for a first semester biochemistry course is described, which integrates the traditional classroom study of the structure and function of biomolecules with the laboratory study of these molecules using fluorescence spectroscopy. Students are assigned a specific question addressing the stability/function of lipids, proteins, or…

  8. Financial incentives and the supply of laboratory tests.

    PubMed

    Carlsen, Fredrik; Grytten, Jostein; Skau, Irene

    2003-11-01

    This study examined how the number of laboratory tests taken by a sample of Norwegian contract physicians is influenced by their private economy outside of the practice and by changes in remuneration. The data are drawn from 40,000 consultations carried out by 44 contract physicians in 1991-1994. Two factors which led to changes in the level of physicians' income are considered: changes in remuneration for consultations and laboratory tests and changes in interest rates on loans and bank deposits. The effect which changes in interest rates have on physicians' disposable income was calculated using information about their financial assets and debts obtained from tax assessments. The main finding was that changes in private economy and changes in remuneration have no or only a small effect on the number of laboratory tests taken. Our results suggest that fee regulation can be an effective means of controlling physicians' income and therefore government expenditure on primary physician services.

  9. Pre-contract project scoping processes : synthesis of practices.

    DOT National Transportation Integrated Search

    2016-02-01

    Scoping is the process of developing a projects objectives, need, preliminary cost estimate, and preliminary schedule based on a : recognized need that the project is intended to address. This study (INDOT/JTRP SPR-3944) was launched by the Indian...

  10. 48 CFR 1335.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1335.006 Contracting methods and... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contracting methods and... research services under the contract might involve the use of human subjects. The provision is mandatory...

  11. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2010-10-01 2010-10-01 false Covered projects. 633.11 Section 633.11...

  12. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2012-10-01 2012-10-01 false Covered projects. 633.11 Section 633.11...

  13. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2013-10-01 2013-10-01 false Covered projects. 633.11 Section 633.11...

  14. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2014-10-01 2014-10-01 false Covered projects. 633.11 Section 633.11...

  15. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2011-10-01 2011-10-01 false Covered projects. 633.11 Section 633.11...

  16. Guidelines for cost control and analysis of cost-type research and development contracts

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  17. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT ANNUAL REPORT TO THE DEPARTMENT OF ENERGY - DECEMBER 2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FOX,K.J.

    Brookhaven National (BNL) Laboratory is a multidisciplinary laboratory that carries out basic and applied research in the physical, biomedical, and environmental sciences, and in selected energy technologies. It is managed by Brookhaven Science Associates, LLC, under contract with the U. S. Department of Energy. BNL's total annual budget has averaged about $460 million. There are about 2,800 employees, and another 4,500 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annually inmore » March, as required by DOE Order 4 13.2A, ''Laboratory Directed Research and Development,'' January 8, 2001, and the LDRD Annual Report guidance, updated February 12, 1999. The LDRD Program obtains its funds through the Laboratory overhead pool and operates under the authority of DOE Order 413.2A. The goals and objectives of BNL's LDRD Program can be inferred from the Program's stated purposes. These are to (1) encourage and support the development of new ideas and technology, (2) promote the early exploration and exploitation of creative and innovative concepts, and (3) develop new ''fundable'' R&D projects and programs. The emphasis is clearly articulated by BNL to be on supporting exploratory research ''which could lead to new programs, projects, and directions'' for the Laboratory. As one of the premier scientific laboratories of the DOE, BNL must continuously foster groundbreaking scientific research. At Brookhaven National Laboratory one such method is through its LDRD Program. This discretionary research and development tool is critical in maintaining the scientific excellence and long-term vitality of the Laboratory. Additionally, it is a means to stimulate the scientific community and foster new science and technology ideas, which becomes a major factor in achieving and maintaining staff

  18. 48 CFR 52.222-34 - Project Labor Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., quality of work, safety, and health; and (6) Fully conform to all statutes, regulations, Executive orders... maintain in a current status throughout the life of the contract the project labor agreement entered into... Contractor shall maintain in a current status throughout the life of the contract the project labor agreement...

  19. Coalition contract management as a systems change strategy for HIV prevention.

    PubMed

    Darrow, William W; Montanea, Julie E; Sánchez-Braña, Elizabeth

    2010-11-01

    Racial and Ethnic Approaches to Community Health (REACH) 2010 provided a unique opportunity for minority community-based organizations (CBOs) to work together to eliminate disparities in HIV disease. A coalition was formed in Broward County to respond to the REACH 2010 program announcement, a university was chosen to coordinate efforts, and contracts were negotiated with CBO partners to develop, implement, and evaluate a community action plan. Contract management provided stability, focus, and a mechanism for coalition partners to measure progress toward achieving project objectives. By emphasizing documentation as well as the delivery of services, however, contract conditions also placed a heavy burden on educational outreach workers, restricted the reimbursable activities of member organizations, and created friction between minority agencies and university staff. Although the coalition met many of its objectives, the introduction and enforcement of a mutually agreed on set of rules and obligations as a way of promoting systems change in Broward County failed to make a lasting impact among community partners. CBOs continued to compete with one another for HIV prevention project funding and stopped collaborating as closely with another when federal support for our REACH 2010 community demonstration project ran out.

  20. Laboratory Class Project: Using a Cichlid Fish Display Tank to Teach Students about Complex Behavioral Systems.

    PubMed

    Nolan, Brian C

    2010-01-01

    Laboratory activities serve several important functions in undergraduate science education. For neuroscience majors, an important and sometimes underemphasized tool is the use of behavioral observations to help inform us about the consequences of changes that are occurring on a neuronal level. To help address this concern, the following laboratory exercise is presented. The current project tested the prediction that the most dominant fish in a tank of cichlids will have gained the most benefits of its position resulting in the greatest growth and hence, become the largest fish. More specifically: (1) is there evidence that a social hierarchy exists among the fish in our tank based on the number of aggressive acts among the four largest fish; (2) if so, does the apparent rank correspond to the size of the fish as predicted by previous studies? Focal sampling and behavior sampling of aggressive acts between fish were utilized in the data collection. Collectively, the data suggest a social dominance hierarchy may be in place with the following rank order from highest to lowest: Fish A > Fish B > Fish D > Fish C. While the largest (Fish A) seems to be at the top, Fish C ended up being ranked lower than Fish D despite the fact that Fish C is larger. Overall, the project was considered a success by the instructor and students. The students offered several suggestions that could improve future versions of this type of project, in particular concerning the process of constructing a poster about the project. The implications of the data and student learning outcomes are discussed.

  1. Determinants of Service Contract Outcomes

    DTIC Science & Technology

    2011-04-30

    requiring researchers to brief sponsors on project findings as a condition of funding award; “pushing” potentially high- impact research reports (e.g...allocate resources towards those factors that have greater impacts and avoid the inefficient use of resources on those factors that have little or no... impacts . The objective of this research, therefore, is to address existing gaps in the literature and offer service contract practitioners a

  2. Guidance, Navigation and Control Digital Emulation Technology Laboratory. Volume 1. Part 2. Task 1: Digital Emulation Technology Laboratory

    DTIC Science & Technology

    1991-09-27

    AD-A241 692 II I] II I11 ANNUAL REPORT VOLUME 1 PART 2 TASK 1: DIGITAL EMULATION TECHNOLOGY LABORATOIRY REPORT NO. AR-0142-91-001 September 27, 1991... DIGITAL EMULATION TECHNOLOGY LABORATORY Contract No. DASG60-89-C-0142 Sponsored By The United States Army ? trategic Defense Command COMPUTER...ANNUAL REPORT VOLUME 1 PART 2 TASK 1: DIGITAL EMULATION TECHNOLOGY LABORATORY September 27, 1991 Authors Thomas R. Collins and Stephen R. Wachtel

  3. 42 CFR 434.6 - General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under this part must include all of the following: 434.6 Section... contracts and subcontracts.P>(a) Contracts. All contracts under this part must include all of the following...

  4. Teaching Contracts with Contracts

    ERIC Educational Resources Information Center

    Misner, Robert L.

    1977-01-01

    The teaching of contracts law is an area that lends itself easily to introducing students to realistic factual situations. An exercise is described in which students were assigned to separate "firms" with volunteers from the later law school classes as clients. Each firm was responsible for submitting a signed contract and an accompanying paper.…

  5. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  6. Electronic Warfare Closed Loop Laboratory (EWCLL) Antenna Motor Software and Hardware Development

    DTIC Science & Technology

    2016-09-01

    ARL-TN-0779 ● SEP 2016 US Army Research Laboratory Electronic Warfare Closed Loop Laboratory (EWCLL) Antenna Motor Software and...Electronic Warfare Closed Loop Laboratory (EWCLL) Antenna Motor Software and Hardware Development by Neal Tesny Sensors and Electron Devices Directorate...TITLE AND SUBTITLE Electronic Warfare Closed Loop Laboratory (EWCLL) Antenna Motor Software and Hardware Development 5a. CONTRACT NUMBER 5b

  7. Activities of the Oil Implementation Task Force, reporting period March--August 1991; Contracts for field projects and supporting research on enhanced oil recovery, reporting period October--December 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.

  8. Project management of life-science research projects: project characteristics, challenges and training needs.

    PubMed

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  9. A Collection of JPME Operational Contract Support Case Studies and Vignettes

    DTIC Science & Technology

    2016-12-01

    Contracting for goods and services in the contingency operational environment is a mission-enabling necessity; however, analyzing the strategic effects...choosing to contract for goods or services are largely ignored. This project explores the use of OCS in contingency environments, and the positive and...think of the costs literally, as tax dollars spent to enhance mission effectiveness. However, the less literal costs and the associated effects of

  10. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  11. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  12. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  13. Contracts.

    ERIC Educational Resources Information Center

    Gellert, Shepard D.; Wilson, Grace

    1977-01-01

    This paper reviews experimental psychology goal research and its implications for the therapist doing contract therapy. Clinical examples of various levels of contracts give illustrations, and a technique, the therapeutic double bind, as a form of contract, is detailed. A case study is presented to illustrate the use of the theory. Three…

  14. Relational Contract: Applicable to Department of Defense Contracts

    DTIC Science & Technology

    1989-12-01

    examine the evolution of contract law and, in particular, the role of contractual incompleteness in exchange relationships. 2.1.1. The Classical Approach...Classical contract law facilitates exchange by separately detailing all aspects of the contracting process 9 at the outset by prespecification of all...modifications after contractual performance has begun. According to Williamson (1979), classical contract law implements prespecification through legal

  15. Federal Security Laboratory Governance Panels: Observations and Recommendations

    DTIC Science & Technology

    2013-01-01

    operates under a sole-source, cost-plus-fixed-fee contract administered by the U.S. Navy’s Naval Sea Systems Command. There are currently 14 UARCs, 13... system of research organizations that support science and technology for U.S. national security. Within this system , the Departments of Defense, Energy...and Homeland Security support about 80 laboratories that focus predominantly on national security matters. These laboratories have different

  16. The Virtual Robotics Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kress, R.L.; Love, L.J.

    The growth of the Internet has provided a unique opportunity to expand research collaborations between industry, universities, and the national laboratories. The Virtual Robotics Laboratory (VRL) is an innovative program at Oak Ridge National Laboratory (ORNL) that is focusing on the issues related to collaborative research through controlled access of laboratory equipment using the World Wide Web. The VRL will provide different levels of access to selected ORNL laboratory secondary education programs. In the past, the ORNL Robotics and Process Systems Division has developed state-of-the-art robotic systems for the Army, NASA, Department of Energy, Department of Defense, as well asmore » many other clients. After proof of concept, many of these systems sit dormant in the laboratories. This is not out of completion of all possible research topics. but from completion of contracts and generation of new programs. In the past, a number of visiting professors have used this equipment for their own research. However, this requires that the professor, and possibly his/her students, spend extended periods at the laboratory facility. In addition, only a very exclusive group of faculty can gain access to the laboratory and hardware. The VRL is a tool that enables extended collaborative efforts without regard to geographic limitations.« less

  17. 48 CFR 552.236-83 - Requirement for a Project Labor Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... “Project Labor Agreement” (PLA) means an agreement between the contractor, subcontractors, and the union(s) representing workers. Under a PLA, the contractor and subcontractors on a project and the union(s) agree on... Contractor shall, after contract award, enter into a PLA for performance of [Insert project or contract name...

  18. SIPCAn (Separation, Isolation, Purification, Characterization, and Analysis): A One-Term, Integrated Project for the Undergraduate Organic Laboratory

    ERIC Educational Resources Information Center

    Dintzner, Matthew R.; Kinzie, Charles R.; Pulkrabek, Kimberly A.; Arena, Anthony F.

    2011-01-01

    SIPCAn, an acronym for separation, isolation, purification, characterization, and analysis, is presented as a one-term, integrated project for the first-term undergraduate organic laboratory course. Students are assigned two mixtures of unknown organic compounds--a mixture of two liquid compounds and a mixture of two solid compounds--at the…

  19. US Army Research Laboratory and University of Notre Dame Distributed Sensing: Hardware Overview

    DTIC Science & Technology

    2017-11-01

    ARL-TR-8199 ● NOV 2017 US Army Research Laboratory US Army Research Laboratory and University of Notre Dame Distributed Sensing...US Army Research Laboratory US Army Research Laboratory and University of Notre Dame Distributed Sensing: Hardware Overview by Roger P...TITLE AND SUBTITLE US Army Research Laboratory and University of Notre Dame Distributed Sensing: Hardware Overview 5a. CONTRACT NUMBER 5b. GRANT

  20. Incorporating Non-energy Benefits into Energy Savings Performance Contracts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Peter; Goldman, Charles; Gilligan, Donald

    2012-06-01

    This paper evaluates the issue of non-energy benefits within the context of the U.S. energy services company (ESCO) industry?a growing industry comprised of companies that provide energy savings and other benefits to customers through the use of performance-based contracting. Recent analysis has found that ESCO projects in the public/institutional sector, especially at K-12 schools, are using performance-based contracting, at the behest of the customers, to partially -- but not fully -- offset substantial accumulated deferred maintenance needs (e.g., asbestos removal, wiring) and measures that have very long paybacks (roof replacement). This trend is affecting the traditional economic measures policymakers usemore » to evaluate success on a benefit to cost basis. Moreover, the value of non-energy benefits which can offset some or all of the cost of the non-energy measures -- including operations and maintenance (O&M) savings, avoided capital costs, and tradable pollution emissions allowances-- are not always incorporated into a formal cost-effectiveness analysis of ESCO projects. Nonenergy benefits are clearly important to customers, but state and federal laws that govern the acceptance of these types of benefits for ESCO projects vary widely (i.e., 0-100percent of allowable savings can come from one or more non-energy categories). Clear and consistent guidance on what types of savings are recognized in Energy Savings agreements under performance contracts is necessary, particularly where customers are searching for deep energy efficiency gains in the building sector.« less

  1. Notification: Oversight of Superfund State Contracts for Remedial Activities

    EPA Pesticide Factsheets

    Project #OA-FY15-0054, December 30, 2014. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) is beginning an audit of the EPA's oversight of Superfund State Contracts (SSCs) for remedial activities.

  2. 24 CFR 236.755 - Housing owner's obligation under contract to report tenant income increase.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FOR RENTAL PROJECTS Rental Assistance Payments § 236.755 Housing owner's obligation under contract to... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Housing owner's obligation under contract to report tenant income increase. 236.755 Section 236.755 Housing and Urban Development...

  3. Laboratory-based respiratory virus surveillance pilot project on select cruise ships in Alaska, 2013-15.

    PubMed

    Rogers, Kimberly B; Roohi, Shahrokh; Uyeki, Timothy M; Montgomery, David; Parker, Jayme; Fowler, Nisha H; Xu, Xiyan; Ingram, Deandra J; Fearey, Donna; Williams, Steve M; Tarling, Grant; Brown, Clive M; Cohen, Nicole J

    2017-09-01

    Influenza outbreaks can occur among passengers and crews during the Alaska summertime cruise season. Ill travellers represent a potential source for introduction of novel or antigenically drifted influenza virus strains to the United States. From May to September 2013-2015, the Alaska Division of Public Health, the Centers for Disease Control and Prevention (CDC), and two cruise lines implemented a laboratory-based public health surveillance project to detect influenza and other respiratory viruses among ill crew members and passengers on select cruise ships in Alaska. Cruise ship medical staff collected 2-3 nasopharyngeal swab specimens per week from passengers and crew members presenting to the ship infirmary with acute respiratory illness (ARI). Specimens were tested for respiratory viruses at the Alaska State Virology Laboratory (ASVL); a subset of specimens positive for influenza virus were sent to CDC for further antigenic characterization. Of 410 nasopharyngeal specimens, 83% tested positive for at least one respiratory virus; 71% tested positive for influenza A or B virus. Antigenic characterization of pilot project specimens identified strains matching predominant circulating seasonal influenza virus strains, which were included in the northern or southern hemisphere influenza vaccines during those years. Results were relatively consistent across age groups, recent travel history, and influenza vaccination status. Onset dates of illness relative to date of boarding differed between northbound (occurring later in the voyage) and southbound (occurring within the first days of the voyage) cruises. The high yield of positive results indicated that influenza was common among passengers and crews sampled with ARI. This finding reinforces the need to bolster influenza prevention and control activities on cruise ships. Laboratory-based influenza surveillance on cruise ships may augment inland influenza surveillance and inform control activities. However, these

  4. Monitoring laboratory data across manufacturers and laboratories--A prerequisite to make "Big Data" work.

    PubMed

    Goossens, Kenneth; Van Uytfanghe, Katleen; Twomey, Patrick J; Thienpont, Linda M

    2015-05-20

    "The Percentiler" project provides quasi real-time access to patient medians across laboratories and manufacturers. This data can serve as "clearinghouse" for electronic health record applications, e.g., use of laboratory data for global health-care research. Participants send their daily outpatient medians to the Percentiler application. After 6 to 8weeks, the laboratory receives its login information, which gives access to the user interface. Data is assessed by peer group, i.e., 10 or more laboratories using the same test system. Participation is free of charge. Participation is global with, to date, >120 laboratories and >250 instruments. Up to now, several reports have been produced that address i) the general features of the project, ii) peer group observations; iii) synergisms between "The Percentiler" and dedicated external quality assessment surveys. Reasons for long-term instability and bias (calibration- or lot-effects) have been observed for the individual laboratory and manufacturers. "The Percentiler" project has the potential to build a continuous, global evidence base on in vitro diagnostic test comparability and stability. As such, it may be beneficial for all stakeholders and, in particular, the patient. The medical laboratory is empowered for contributing to the development, implementation, and management of global health-care policies. Copyright © 2015 Elsevier B.V. All rights reserved.

  5. Contraction induced h reflexes in the diagnosis of cervical radiculopathy.

    PubMed

    Bodofsky, Elliot B; Campellone, Joseph V; Cohen, Stephen J; Caten, Holly N; Schindelheim, Adam M

    2015-06-01

    To determine whether Contraction Induced H Reflexes (CIHR) can accurately detect cervical radiculopathy. Comparison of CIHR results with Needle Electromyography at academic outpatient Electromyography/Nerve Conduction laboratories. Participants were all patients over 18 with a needle electromyography diagnosis of cervical radiculopathy. Patients were tested for CIHR in at least two upper extremity muscles in electromyographically proven myotomes bilaterally. Patients were requested to perform a moderate contraction while stimulus was applied proximally (elbow or Erb's point). Outcome measures included H Reflex onset latency and side-to-side latency differences. These were compared against previously established normal values. Overall, 10 of 15 patients who met criteria for cervical radiculopathy showed CIHR abnormalities (sensitivity = 67%; 95% confidence interval, 43-91). Counting each side and level separately, CIHR identified 16/27 radiculopathies (sensitivity = 59.2%; 95% confidence interval, 40.6-77.8). Contraction Induced H Reflexes identified 1 possible radiculopathy not seen on electromyography (specificity = 98%; 95% confidence interval, 95-100). Contraction induced H Reflexes have a sensitivity and specificity for cervical radiculopathy similar to the resting Gastroc-Soleus H Reflex.

  6. Specification Section 01065S ES&H for Service Contracts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirsch, Greg C.

    2014-07-01

    Section Includes: Requirements and guidelines in performance of work concerning protection of environment and property, and the safety and health of Contractors, Sandia National Laboratories (SNL) and Department of Energy (DOE) employees, visitors to SNL, and members of the public. This Section is applicable only to Service Contracts that do not involve construction or construction-like activities. Construction and construction-like activities are covered by Section 01065, Environment, Safety and Health (ES&H) for Construction Contracts. The entire ES&H program shall focus on safe-by-design intent, understanding the technical basis for the work, identifying and controlling energy sources, unacceptable consequences, risk assessments, and positivemore » verification.« less

  7. Electromyographic evaluation of abdominal-muscle function with and without concomitant pelvic-floor-muscle contraction.

    PubMed

    Tahan, Nahid; Arab, Amir Massoud; Vaseghi, Bita; Khademi, Khosro

    2013-05-01

    Coactivation of abdominal and pelvic-floor muscles (PFM) is an issue considered by researchers recently. Electromyography (EMG) studies have shown that the abdominal-muscle activity is a normal response to PFM activity, and increase in EMG activity of the PFM concomitant with abdominal-muscle contraction was also reported. The purpose of this study was to compare the changes in EMG activity of the deep abdominal muscles during abdominal-muscle contraction (abdominal hollowing and bracing) with and without concomitant PFM contraction in healthy and low-back-pain (LBP) subjects. A 2 × 2 repeated-measures design. Laboratory. 30 subjects (15 with LBP, 15 without LBP). Peak rectified EMG of abdominal muscles. No difference in EMG of abdominal muscles with and without concomitant PFM contraction in abdominal hollowing (P = .84) and abdominal bracing (P = .53). No difference in EMG signal of abdominal muscles with and without PFM contraction between LBP and healthy subjects in both abdominal hollowing (P = .88) and abdominal bracing (P = .98) maneuvers. Adding PFM contraction had no significant effect on abdominal-muscle contraction in subjects with and without LBP.

  8. Chemical kinetics as a contract sport

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kolb, C.E.

    1990-01-01

    Earlier in this century chemical kinetics was a basic physical chemistry research topic widely pursued in leading academic chemistry departments. Chemical kinetics now appears to be a discipline practiced chiefly for its applications to societal problems. The chemical kinetics activities directed by D.M. Golden at SRI International are strikingly successful in generating data for key applied problems while at the same time advancing our understanding of chemical kinetics as a scientific discipline. In this talk, the author will contrast the chemical kinetics activities in two contract R D laboratories, one on the right side of the U.S. (ARI) and themore » other on the left (SRI). Their approach to common applied problems ranging from stratospheric heterogeneous kinetics to plasma etching systems for semiconductor processing will be compared and contrasted. Empirically discovered Golden Rules for the pursuit of quality chemical kinetics research in a contract R D environment will be presented and discussed.« less

  9. Beverly Hayes | Frederick National Laboratory for Cancer Research

    Cancer.gov

    Employee name: Bev Hayes Directorate: Management Operations Department or lab: Contracts and Acquisitions How many years have you worked at the Frederick National Laboratory? Four months going on one year! Job responsibilities: With the C&A manageme

  10. Arroyo Mocho Boulder Removal Project: Lawrence Livermore National Laboratory Hetch Hetchy Pump Station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burkholder, L; Kato, T; Van Hattem, M

    2007-06-28

    The purpose of this biological assessment is to review the proposed Arroyo Mocho Boulder Removal Project in sufficient detail to determine to what extent the proposed action may affect any of the threatened, endangered, proposed, or sensitive species and designated or proposed critical habitats listed below. In addition, the following information is provided to comply with statutory requirements to use the best scientific and commercial information available when assessing the risks posed to listed and/or proposed species and designated and/or proposed critical habitat by proposed federal actions. This biological assessment is prepared in accordance with legal requirements set forth undermore » regulations implementing Section 7 of the Endangered Species Act (50 CFR 402; 16 U.S.C 1536 (c)). It is our desire for the Arroyo Mocho Boulder Removal Project to receive incidental take coverage for listed species and critical habitat within the greater project area by means of amending the previous formal Section 7 consultation (1-1-04-F-0086) conducted a few hundred meters downstream by Lawrence Livermore National Laboratory (LLNL) in 2002. All conservation measures, terms and conditions, and reporting requirements from the previous Biological Opinion (1-1-04-F-0086) have been adopted for this Biological Assessment and/or amendment.« less

  11. Projection of Teachers' Salaries for Contract Negotiations.

    ERIC Educational Resources Information Center

    Ott, Jack P.

    1982-01-01

    Lists and explains a computer program written in BASIC which calculates teacher salaries using a salary index. Modification of this payroll program is suggested as a student project in schools which teach computer programing. (JJD)

  12. The New Jersey Department of Higher Education's Health Manpower Planning Contract. Final Comprehensive Report.

    ERIC Educational Resources Information Center

    Tomson, Jon; Vasilenko, Patricia

    This report of the New Jersey Department of Higher Education's Health Manpower Planning Contract describes project activities and assessment methods and models, presents data on employment supply and demand, and provides samples of questionnaires and forms that were used. The department was required under contract to: survey and evaluate pertinent…

  13. Behavioural contracting as a tool to help patients achieve better health.

    PubMed

    Neale, A V

    1991-12-01

    Behavioural contracting is an intervention technique in which a client signs an agreement to make certain behaviour changes within a specified time, usually with explicitly defined rewards for adherence or success. Contracting is being increasingly used by health professionals to assist patients in making beneficial life style changes. This paper presents data on the outcome of behavioural contracting interventions to lower serum cholesterol and to increase exercise activity. Of 223 primary care patients enrolled in a health promotion programme, 179 met with the project health educator to improve their cardiovascular risk profile; 144 of these were classified as having 'high cholesterol' and 51 signed contracts to adopt the American Heart Association guidelines diet within a 3-month period. Everyone was encouraged to sign a contract to engage in aerobic exercise three times per week; 96 did so. The results indicate that contractors achieved greater beneficial health changes than non-contractors, and that the group which fully met their contract obligations experienced the greatest health benefit of all (either a lowering of cholesterol or a decreased exercising heart rate).

  14. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supervision and guarantee at the highest level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into subcontracts where the functional scope of the subcontractor's obligations is...

  15. Notification: Administration of Emergency and Rapid Response Services Contracts

    EPA Pesticide Factsheets

    Project #OA-FY13-0046, October 23, 2012. The EPA OIG’s Office of Audit plans to begin the preliminary research phase of an audit evaluating Region 6’s administration and management of the Emergency and Rapid Response Services (ERRS) contracts.

  16. 40 CFR 160.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Applicability to studies performed under grants and contracts. 160.10 Section 160.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS General Provisions § 160.10...

  17. 40 CFR 792.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Applicability to studies performed under grants and contracts. 792.10 Section 792.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS General...

  18. 48 CFR 1816.303-70 - Cost-sharing contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... organizations is mandatory in any contract for basic or applied research resulting from an unsolicited proposal... the research, and the contractor has no means of recovering its shared costs on such projects. (2) The... contribution from non-Federal sources; (ii) The extent to which the particular area of research requires...

  19. [Claim and reality of selective contact options : experiences in finalizing selective contracts in urological care].

    PubMed

    Ex, P; Schroeder, A

    2014-08-01

    Selective contracts are an important component in addition to the total healthcare concept in order to introduce process-related innovations into the healthcare system. Since 2011 the Berufsverband der Deutschen Urologen (BDU, Professional Association of German Urologists) has held negotiations with individual health insurance companies and care providers in order to view selective contracts as collective contracts, not only as pilot projects but also as additional forms of care.This article illustrates the experiences of the BDU in the initiation and finalizing of selective contracts as well as existing weak points in the framework conditions.

  20. 24 CFR 401.99 - How does an owner request a section 8 contract renewal?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... section 8 contract renewal? (a) Requesting Restructuring Plan. An owner may request a section 8 contract renewal as part of a Restructuring Plan by, at least 3 months before the expiration date of any project... HUD of any pending suspension or debarment or other enforcement action, or, if so, a voluntary sale or...

  1. 25 CFR Appendix A to Subpart E - IRR Program Functions That Are Not Otherwise Contractible

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... contract payments; 7. Approving contract modifications; 8. Processing claims and disputes with tribal... assure compliance with or exceeding Federal standards for IRR design and construction. G. Construction: 1... inspection and acceptance of project documents as-built drawings on behalf of BIA as facility owner; and 11...

  2. Sulimar Queen environmental restoration project closure package Sandia environmental stewardship exemplar.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tillman, Jack B.

    In March 2008, Sandia National Laboratories (Sandia), in partnership with the Bureau of Land Management, Roswell Field Office, completed its responsibilities to plug and abandon wells and restore the surface conditions for the Sulimar Queens Unit, a 2,500 acre oil field, in Chaves County, Southeast New Mexico. Sandia assumed this liability in an agreement to obtain property to create a field laboratory to perform extensive testing and experimentation on enhanced oil recovery techniques for shallow oil fields. In addition to plugging and abandoning 28 wells, the project included the removal of surface structures and surface reclamation of disturbed lands associatedmore » with all plugged and abandoned wells, access roads, and other auxiliary facilities within unit boundaries. A contracting strategy was implemented to mitigate risk and reduce cost. As the unit is an important wildlife habitat for prairie chickens, sand dune lizards, and mule deer, the criteria for the restoration and construction process were designed to protect and enhance the wildlife habitat. Lessons learned from this project include: (1) extreme caution should be exercised when entering agreements that include future liabilities, (2) partnering with the regulator has huge benefits, and (3) working with industry experts, who were familiar with the work, and subcontractors, who provided the network to complete the project cost effectively.« less

  3. Summary Report: Visitor Safety and Security at Corps of Engineers Projects.

    DTIC Science & Technology

    1982-10-01

    23 Incident Reporting System. ..... .............. 23 Contract Law Enforcement ...... .............. 25 Project Management...average length of stay being 3.3 days. Contract Law Enforcement Conclusions , The Corps’ contract law enforcement program is extremely fragile in terms...to prohibit the public display alcoholic beverages and consumption of alcoholic beverages. Use contract law initiate law enforcement contracts

  4. 24 CFR 888.320 - One-time Contract Rent determination.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-FAIR MARKET RENTS AND... Elderly or Handicapped, and Special Allocations Projects § 888.320 One-time Contract Rent determination...

  5. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  6. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  7. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  8. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  9. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  10. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less

  11. 42 CFR 52h.9 - What matters must be reviewed for unsolicited contract proposals?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false What matters must be reviewed for unsolicited contract proposals? 52h.9 Section 52h.9 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN... PROJECTS § 52h.9 What matters must be reviewed for unsolicited contract proposals? (a) Except as otherwise...

  12. Risk-based Prioritization of Facility Decommissioning and Environmental Restoration Projects in the National Nuclear Legacy Liabilities Program at the Chalk River Laboratory - 13564

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Jerel G.; Kruzic, Michael; Castillo, Carlos

    2013-07-01

    Chalk River Laboratory (CRL), located in Ontario Canada, has a large number of remediation projects currently in the Nuclear Legacy Liabilities Program (NLLP), including hundreds of facility decommissioning projects and over one hundred environmental remediation projects, all to be executed over the next 70 years. Atomic Energy of Canada Limited (AECL) utilized WorleyParsons to prioritize the NLLP projects at the CRL through a risk-based prioritization and ranking process, using the WorleyParsons Sequencing Unit Prioritization and Estimating Risk Model (SUPERmodel). The prioritization project made use of the SUPERmodel which has been previously used for other large-scale site prioritization and sequencing ofmore » facilities at nuclear laboratories in the United States. The process included development and vetting of risk parameter matrices as well as confirmation/validation of project risks. Detailed sensitivity studies were also conducted to understand the impacts that risk parameter weighting and scoring had on prioritization. The repeatable prioritization process yielded an objective, risk-based and technically defendable process for prioritization that gained concurrence from all stakeholders, including Natural Resources Canada (NRCan) who is responsible for the oversight of the NLLP. (authors)« less

  13. Polymorphic Contracts

    NASA Astrophysics Data System (ADS)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  14. 46 CFR 190.05-20 - Segregation of chemical laboratories and chemical storerooms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Segregation of chemical laboratories and chemical... chemical laboratories and chemical storerooms. (a) The provisions of this section shall apply to all vessels contracted for on or after March 1, 1968. (b) Chemical storerooms shall not be located in...

  15. 46 CFR 190.05-20 - Segregation of chemical laboratories and chemical storerooms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Segregation of chemical laboratories and chemical... chemical laboratories and chemical storerooms. (a) The provisions of this section shall apply to all vessels contracted for on or after March 1, 1968. (b) Chemical storerooms shall not be located in...

  16. 46 CFR 190.05-20 - Segregation of chemical laboratories and chemical storerooms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Segregation of chemical laboratories and chemical... chemical laboratories and chemical storerooms. (a) The provisions of this section shall apply to all vessels contracted for on or after March 1, 1968. (b) Chemical storerooms shall not be located in...

  17. 46 CFR 190.05-20 - Segregation of chemical laboratories and chemical storerooms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Segregation of chemical laboratories and chemical... chemical laboratories and chemical storerooms. (a) The provisions of this section shall apply to all vessels contracted for on or after March 1, 1968. (b) Chemical storerooms shall not be located in...

  18. 46 CFR 190.05-20 - Segregation of chemical laboratories and chemical storerooms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Segregation of chemical laboratories and chemical... chemical laboratories and chemical storerooms. (a) The provisions of this section shall apply to all vessels contracted for on or after March 1, 1968. (b) Chemical storerooms shall not be located in...

  19. The Construction of Defense Department Contracts in Thin Markets

    DTIC Science & Technology

    2014-04-30

    future rounds of contracting. An example of a good or service with a high degree of specialized investments is the production of flu vaccines ...Producing flu vaccines requires a substantial investment in scientific research (a highly specialized human skill) and specialized laboratories and...equipment. If the purchasing government finds that the flu vaccine it purchases does not meets its needs, then it cannot easily find another vendor

  20. A Theory of Diagnostic Inference: Contract Final Report,

    DTIC Science & Technology

    1983-11-01

    and I-bLications ftlated to this Contract ........ 19 1caml.igmnts and Scientific I&VOuMM1.......................... 21 M&i 2 This report esunarizes our... Comunications Sciences Division Naval Training Equipment Center Code 7500 Orlando, FL 32813 Naval Research Laboratory Washington, D. C. 20375 Dr. Gary...Dr. A. L. Slafkosky Scientific Advisor Commander Commandant of the Marine Corps Naval Electronics Systems Co-and C6de RD-1 Human Factors Engineering

  1. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), whichmore » identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements

  2. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  3. 48 CFR 1552.237-70 - Contract publication review procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract publication review procedures. 1552.237-70 Section 1552.237-70 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION... Project Officer, at least 30 days prior to publication, a copy of any paper, article, or other...

  4. Procedures of Exercise Physiology Laboratories

    NASA Technical Reports Server (NTRS)

    Bishop, Phillip A.; Fortney, Suzanne; Greenisen, Michael; Siconolfi, Steven F.; Bamman, Marcas M.; Moore, Alan D., Jr.; Squires, William

    1998-01-01

    This manual describes the laboratory methods used to collect flight crew physiological performance data at the Johnson Space Center. The Exercise Countermeasures Project Laboratory is a standard physiology laboratory; only the application to the study of human physiological adaptations to spaceflight is unique. In the absence of any other recently published laboratory manual, this manual should be a useful document staffs and students of other laboratories.

  5. Managed Utility Services Contracts | Climate Neutral Research Campuses |

    Science.gov Websites

    the energy cost savings generated by the project. Managed Utility Services Contracts In a Managed . The owner, in this case the research campus, bears no upfront cost through this agreement, pays the revenue to capital cost repayment and maintenance costs. In addition to removing the burden of an upfront

  6. SWEIS Yearbook-2012 Comparison of 2012 Data to Projections of the 2008 Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahowald, Hallie B.; Wright, Marjorie Alys

    2014-01-16

    Los Alamos National Laboratory (LANL or the Laboratory) operations data for Calendar Year (CY) 2012 mostly fell within the 2008 Site-Wide Environmental Impact Statement (SWEIS) projections. Operation levels for one LANL facility exceeded the 2008 SWEIS capability projections—Radiochemistry Facility; however, none of the capability increases caused exceedances in radioactive air emissions, waste generation, or National Pollutant Discharge Elimination System (NPDES) discharge. Several facilities exceeded the2008 SWEIS levels for waste generation quantities; however, all were one-time, non-routine events that do not reflect the day-to-day operations of the Laboratory. In addition, total site-wide waste generation quantities were below SWEIS projections for allmore » waste types, reflecting the overall levels of operations at both the Key and Non-Key Facilities. Although gas and electricity consumption have remained within the 2008 SWEIS limits for utilities, water consumption exceeded the 2008 SWEIS projections by 27 million gallons in CY 2012.« less

  7. Resolving Contract Disputes

    DTIC Science & Technology

    1988-11-01

    as part of the required training for Army contracting personnel. Specifically, these were courses in contract administration and contract law offered...courts and boards. The process itself was discussed in very general terms.[7] The AFIT Government Contract Law Course concerns itself with legal concepts...Washington, D.C., 1984 4. . Air Force Institute of Technology, Government Contract Law , Course Manual, Wright-Patterson Air Force Base, Ohio, April

  8. 7 CFR 632.18 - Special projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Special projects. 632.18 Section 632.18 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Qualifications § 632.18 Special projects. (a) The NRCS State conservationist may approve the following types of special projects subject to the...

  9. 7 CFR 632.18 - Special projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Special projects. 632.18 Section 632.18 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Qualifications § 632.18 Special projects. (a) The NRCS State conservationist may approve the following types of special projects subject to the...

  10. 7 CFR 632.18 - Special projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Special projects. 632.18 Section 632.18 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Qualifications § 632.18 Special projects. (a) The NRCS State conservationist may approve the following types of special projects subject to the...

  11. 7 CFR 632.18 - Special projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Special projects. 632.18 Section 632.18 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Qualifications § 632.18 Special projects. (a) The NRCS State conservationist may approve the following types of special projects subject to the...

  12. NASA's Atmospheric Effects of Aviation Project: Results of the August 1999 Aerosol Measurement Intercomparison Workshop, Laboratory Phase

    NASA Technical Reports Server (NTRS)

    Cofer, W. Randy, III; Anderson, Bruce E.; Connors, V. S.; Wey, C. C.; Sanders, T.; Twohy, C.; Brock, C. A.; Winstead, E. L.; Pui, D.; Chen, Da-Ren

    2001-01-01

    During August 1-14, 1999, NASA's Atmospheric Effects of Aviation Project (AEAP) convened a workshop at the NASA Langley Research Center to try to determine why such a wide variation in aerosol emissions indices and chemical and physical properties have been reported by various independent AEAP-supported research teams trying to characterize the exhaust emissions of subsonic commercial aircraft. This workshop was divided into two phases, a laboratory phase and a field phase. The laboratory phase consisted of supplying known particle number densities (concentrations) and particle size distributions to a common manifold for the participating research teams to sample and analyze. The field phase was conducted on an aircraft run-up pad. Participating teams actually sampled aircraft exhaust generated by a Langley T-38 Talon aircraft at 1 and 9 m behind the engine at engine powers ranging from 48 to 100 percent. Results from the laboratory phase of this intercomparison workshop are reported in this paper.

  13. A Theoretical Manpower Optimization Model for the Air Force Installation Contracting Agency (AFICA)

    DTIC Science & Technology

    2017-12-01

    development and enterprise-wide market intelligence. The theoretical manpower model proposed by this project optimizes manpower in respect to contracting...procurement needs and/or more effectively leverage spend, market position, market knowledge (e.g., price benchmarks), and capabilities (e.g., IT...CONS level because the process savings are not clearly traceable to a contract action. For example, to augment the market intelligence of category

  14. 48 CFR 35.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... indicated a high degree of probability that development is feasible and (2) the Government has determined... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.006 Contracting methods and..., performance objectives, and specifications for the work can be defined will largely determine the type of...

  15. 24 CFR 402.4 - Contract renewals under section 524(a)(1) of MAHRA.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER... exceed comparable market rents. (2) Procedure for projects eligible for Restructuring Plan. (i) If an... Restructuring Plan under the Mark-to-Market program under part 401 and that has not been rejected under that...

  16. 24 CFR 402.4 - Contract renewals under section 524(a)(1) of MAHRA.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER... exceed comparable market rents. (2) Procedure for projects eligible for Restructuring Plan. (i) If an... Restructuring Plan under the Mark-to-Market program under part 401 and that has not been rejected under that...

  17. 24 CFR 402.4 - Contract renewals under section 524(a)(1) of MAHRA.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER... exceed comparable market rents. (2) Procedure for projects eligible for Restructuring Plan. (i) If an... Restructuring Plan under the Mark-to-Market program under part 401 and that has not been rejected under that...

  18. 24 CFR 402.4 - Contract renewals under section 524(a)(1) of MAHRA.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER... exceed comparable market rents. (2) Procedure for projects eligible for Restructuring Plan. (i) If an... Restructuring Plan under the Mark-to-Market program under part 401 and that has not been rejected under that...

  19. 24 CFR 402.4 - Contract renewals under section 524(a)(1) of MAHRA.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER... exceed comparable market rents. (2) Procedure for projects eligible for Restructuring Plan. (i) If an... Restructuring Plan under the Mark-to-Market program under part 401 and that has not been rejected under that...

  20. 78 FR 72109 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007, Denver... contract for the delivery of project water for authorized uses in newspapers of general circulation in the...

  1. 78 FR 72111 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007, [[Page 72112... actions for any contract for the delivery of project water for authorized uses in newspapers of general...

  2. Professional services contract manager development and certification strategy : spr 696 : final report.

    DOT National Transportation Integrated Search

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  3. 7 CFR 634.13 - Project applications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Project applications. 634.13 Section 634.13..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Project Authorization and Funding § 634.13 Project applications. (a) The SRCWCC is to assure that a process exists to prepare the RCWP...

  4. 7 CFR 634.13 - Project applications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Project applications. 634.13 Section 634.13..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Project Authorization and Funding § 634.13 Project applications. (a) The SRCWCC is to assure that a process exists to prepare the RCWP...

  5. Practical Laboratory Planning.

    ERIC Educational Resources Information Center

    Ferguson, W. R.

    This book is intended as a guide for people who are planning chemistry and physics research laboratories. It deals with the importance of effective communication between client and architect, the value of preliminary planning, and the role of the project officer. It also discusses the size and layout of individual laboratories, the design of…

  6. Evaluation of narrow transverse contraction joints in jointed plain concrete pavements.

    DOT National Transportation Integrated Search

    2006-03-01

    This report presents the results of a research project conducted at the Louisiana Transportation Research Center (LTRC) to evaluate the performance of narrow transverse contraction joints to control cracking in jointed plain concrete pavements. In ad...

  7. School Building Projects: Managing Insurance and Contracts during Construction

    ERIC Educational Resources Information Center

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  8. NASA's university program: Active grants and research contracts, fiscal year 1974

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Each entry includes institution and location, brief description of project, period of performance, principal investigator at institution, NASA technical officer (monitor), sponsoring NASA installation, interagency field of science or engineering classification C.A.S.E. category, grant or contract number, FY 74 obligations, cumulative obligations, and most recent RTOP coding. Entries are arranged alphabetically within state or country. Four cross indices are presented: (1) grant or contract number; (2) C.A.S.E. field or science or engineering; (3) NASA technical officer location; and (4) RTOP code.

  9. NASA's university program: Active grants and research contracts, fiscal year 1975

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Active university research projects for Fiscal Year 1975 are reported by state, and foreign country. Cross indexes by: (1) grant/contract number; (2) field of science and engineering; (3) technical officer location; and (4) RTOP are included.

  10. An Archeological Overview and Management Plan for the Harry Diamond Laboratories, Adelphi, Maryland.

    DTIC Science & Technology

    1985-07-01

    WORK ON HARRY DIAMOND LABORATORY- ADELPHI, MARYLAND A number of prehistoric and historic sites have been reported in the vicinity of HDLA. Attempts...AD-Rftl 054 AN ARCHEOLOGICAL OVERVIEW AND NANAGENENT PLAN FOR THE Sui HARRY DIAMOND LABORATORIES ADELPHI NARYLRNDCU) U NLRSIFEDENYIROSPHERE CO NEW...An Archeological Overview and Management Plan r ifor the Harry Diamond Laboratories - Adelphi, Maryland Under Contract CX4000-3-0018 with the National

  11. 1999 LDRD Laboratory Directed Research and Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rita Spencer; Kyle Wheeler

    This is the FY 1999 Progress Report for the Laboratory Directed Research and Development (LDRD) Program at Los Alamos National Laboratory. It gives an overview of the LDRD Program, summarizes work done on individual research projects, relates the projects to major Laboratory program sponsors, and provides an index to the principal investigators. Project summaries are grouped by their LDRD component: Competency Development, Program Development, and Individual Projects. Within each component, they are further grouped into nine technical categories: (1) materials science, (2) chemistry, (3) mathematics and computational science, (4) atomic, molecular, optical, and plasma physics, fluids, and particle beams, (5)more » engineering science, (6) instrumentation and diagnostics, (7) geoscience, space science, and astrophysics, (8) nuclear and particle physics, and (9) bioscience.« less

  12. Contracts in radiology practices: contract types and key provisions.

    PubMed

    Muroff, Julie A; Muroff, Lawrence R

    2004-07-01

    A contract between a radiology group and its physician member(s) provides the foundation for the professional relationships in a group practice. The parties are not in positions of parity; contract provisions are structured to maintain the primacy of the group over the individual members. An integration clause should be included to preclude reliance on communications that are not memorialized by the language of the contract. Precise, unambiguous terms must be used to convey the intentions of the parties. The contract should have a clear date of initiation and, if applicable, an effective date of termination. Mechanisms for termination and modification should be expressed clearly to minimize the risk of judicial interference. The method of determining and adjusting the salary and other benefits of the radiologist should be stated, as consideration is necessary to support the existence of a legal contract. The obligations of the radiologist to the practice are often stated in general terms to maximize the group's flexibility. Finally, other key clauses that are discussed in the paper should be incorporated into the contract.

  13. 21 CFR 58.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Applicability to studies performed under grants and contracts. 58.10 Section 58.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... nonclinical laboratory study intended to be submitted to or reviewed by the Food and Drug Administration...

  14. 21 CFR 58.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Applicability to studies performed under grants and contracts. 58.10 Section 58.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... nonclinical laboratory study intended to be submitted to or reviewed by the Food and Drug Administration...

  15. 21 CFR 58.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 1 2013-04-01 2013-04-01 false Applicability to studies performed under grants and contracts. 58.10 Section 58.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... nonclinical laboratory study intended to be submitted to or reviewed by the Food and Drug Administration...

  16. 21 CFR 58.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 1 2012-04-01 2012-04-01 false Applicability to studies performed under grants and contracts. 58.10 Section 58.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... nonclinical laboratory study intended to be submitted to or reviewed by the Food and Drug Administration...

  17. 21 CFR 58.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 1 2014-04-01 2014-04-01 false Applicability to studies performed under grants and contracts. 58.10 Section 58.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... nonclinical laboratory study intended to be submitted to or reviewed by the Food and Drug Administration...

  18. EOS Contract Report: The ASTER and MODIS Projects

    NASA Technical Reports Server (NTRS)

    Slater, P.; Thome, K. (Compiler)

    1997-01-01

    Three major tasks occupied the group's efforts during this six months. The first was measuring the bidirectional reflectance properties of four reflectance samples provided by NIST. S. Biggar and P. Spyak made these measurements in both the VNIR and SWIR. The second major task was the group's move to a new facility in March. This required that our calibration laboratory and blacklab be disassembled and reassembled in addition to moving offices and other equipment. The third task was the joint vicarious calibration that took place the latter half of June. This campaign included two weeks of laboratory measurements by the RSG and nine days in the field. Other work during the past six months consisted of Science Team support activities including the attendance at meetings related to MODIS and ASTER. In addition, K. Scott continued work on the cross-calibration software package by developing a graphical interface to 6S, an uncertainty analysis code, and an image registration module. M. Sicard used a trip to Cimel in France to change the Cimel TIR radiometer's field of view and then characterized this new field of view. Z. Rouf and Z. Murshalin processed radiance-based data from last summer's Lunar Lake campaign.

  19. 2015 Fermilab Laboratory Directed Research & Development Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wester, W.

    2016-05-26

    The Fermi National Accelerator Laboratory (FNAL) is conducting a Laboratory Directed Research and Development (LDRD) program. Fiscal year 2015 represents the first full year of LDRD at Fermilab and includes seven projects approved mid-year in FY14 and six projects approved in FY15. One of the seven original projects has been completed just after the beginning of FY15. The implementation of LDRD at Fermilab is captured in the approved Fermilab 2015 LDRD Annual Program Plan. In FY15, the LDRD program represents 0.64% of Laboratory funding. The scope of the LDRD program at Fermilab will be established over the next couple ofmore » years where a portfolio of about 20 on-going projects representing approximately between 1% and 1.5% of the Laboratory funding is anticipated. This Annual Report focuses on the status of the current projects and provides an overview of the current status of LDRD at Fermilab.« less

  20. Customer satisfaction assessment at the Pacific Northwest National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DN Anderson; ML Sours

    2000-03-23

    The Pacific Northwest National Laboratory (PNNL) is developing and implementing a customer satisfaction assessment program (CSAP) to assess the quality of research and development provided by the laboratory. This report presents the customer survey component of the PNNL CSAP. The customer survey questionnaire is composed of two major sections: Strategic Value and Project Performance. Both sections contain a set of questions that can be answered with a 5-point Likert scale response. The strategic value section consists of five questions that are designed to determine if a project directly contributes to critical future national needs. The project Performance section consists ofmore » nine questions designed to determine PNNL performance in meeting customer expectations. A statistical model for customer survey data is developed and this report discusses how to analyze the data with this model. The properties of the statistical model can be used to establish a gold standard or performance expectation for the laboratory, and then to assess progress. The gold standard is defined using laboratory management input--answers to four questions, in terms of the information obtained from the customer survey: (1) What should the average Strategic Value be for the laboratory project portfolio? (2) What Strategic Value interval should include most of the projects in the laboratory portfolio? (3) What should average Project Performance be for projects with a Strategic Value of about 2? (4) What should average Project Performance be for projects with a Strategic Value of about 4? To be able to provide meaningful answers to these questions, the PNNL customer survey will need to be fully implemented for several years, thus providing a link between management perceptions of laboratory performance and customer survey data.« less

  1. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  2. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel

  3. Managing laboratory automation in a changing pharmaceutical industry

    PubMed Central

    Rutherford, Michael L.

    1995-01-01

    The health care reform movement in the USA and increased requirements by regulatory agencies continue to have a major impact on the pharmaceutical industry and the laboratory. Laboratory management is expected to improve effciency by providing more analytical results at a lower cost, increasing customer service, reducing cycle time, while ensuring accurate results and more effective use of their staff. To achieve these expectations, many laboratories are using robotics and automated work stations. Establishing automated systems presents many challenges for laboratory management, including project and hardware selection, budget justification, implementation, validation, training, and support. To address these management challenges, the rationale for project selection and implementation, the obstacles encountered, project outcome, and learning points for several automated systems recently implemented in the Quality Control Laboratories at Eli Lilly are presented. PMID:18925014

  4. Contracting and Higher Education.

    ERIC Educational Resources Information Center

    Ferris, James M.

    1991-01-01

    The potential gains in efficiency of three types of contracts in college administration are contrasted. Contract types include explicit contracts in the budgeting process between the state and higher education institutions; institutional contracting for inputs; and interinstitutional contracting. The tradeoff between production cost savings and…

  5. [Contract learning: effects of professionalization on the student nurse].

    PubMed

    Jubin, Patricia

    2013-03-01

    The reengineering of nurse training implies the implementation of self-development, empowering tools and a reshaping of the function of accompaniment during training which becomes a shared function. This work is part of a psycho-socio-educational approach of the accompaniment to self-directed learning and also in the field of practices of health and social work. This study contributes to the identification of the conditions of efficiency of contracting between student nurses, tutors and instructors. It aims to explore the interest of a triangular steering of the learning contract centered on the student's individual project and also the interest of meetings during training as triggers to a process of self-construction of competences. Moreover, the study aims to identify the effects of contract on professionalization. Our study reverts to the basic question of learning by contract as a pillar for the self-directed learning in an alternating training context. The empirical approach takes into account a qualitative study carried out with 15 people (tutors, managers, student nurses and instructors) in 3 health care structures and a quantitative study based on 78 first year students, 106 second year students, and 47 third year students at the same nursing education institute. The study shows that learning by contract is empowering and professionalizing, if the student is placed in favorable conditions of learning and contractual relationship.

  6. High-temperature Y267 epdm elastomer - field and laboratory experiences, August 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hirasuna, A.R.; Friese, G.J.; Stephens, G.A.

    1982-01-01

    During the period 1976 to 1979 L'Garde, Inc. developed geothermal elastomer compounds under a U.S. Department of Energy - Division of Geothermal Energy (DOE-DGE) contract. The resulting developments yielded compounds from 4 polymer systems which successfully exceeded the contract requirements. Since completion of the compound development, significant laboratory and down-hole experience occurred, primarily on the Y267 EPDM compound. This work summarizes those experiences. 11 references.

  7. Savannah River Ecology Laboratory. Annual technical progress report of ecological research, period ending July 31, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-07-31

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA) that is managed in conjunction with the University`s Institute of Ecology. The laboratory`s overall mission is to acquire and communicate knowledge of ecological processes and principles. SREL conducts basic and applied ecological research, as well as education and outreach programs, under an M&O contract with the US Department of Energy at the Savannah River Site. Significant accomplishments were made during the year ending July 31, 1994 in the areas of research, education and service. Reviewed in this document are research projects in the followingmore » areas: Environmental Operations Support (impacted wetlands, streams, trace organics, radioecology, database synthesis, wild life studies, zooplankton, safety and quality assurance); wood stork foraging and breeding ecology; defence waste processing facility; environmental risk assessment (endangered species, fish, ash basin studies); ecosystem alteration by chemical pollutants; wetlands systems; biodiversity on the SRS; Environmental toxicology; environmental outreach and education; Par Pond drawdown studies in wildlife and fish and metals; theoretical ecology; DOE-SR National Environmental Research Park; wildlife studies. Summaries of educational programs and publications are also give.« less

  8. Mars Science Laboratory Rover Taking Shape

    NASA Technical Reports Server (NTRS)

    2008-01-01

    This image taken in August 2008 in a clean room at NASA's Jet Propulsion Laboratory, Pasadena, Calif., shows NASA's next Mars rover, the Mars Science Laboratory, in the course of its assembly, before additions of its arm, mast, laboratory instruments and other equipment.

    The rover is about 9 feet wide and 10 feet long.

    Viewing progress on the assembly are, from left: NASA Associate Administrator for Science Ed Weiler, California Institute of Technology President Jean-Lou Chameau, JPL Director Charles Elachi, and JPL Associate Director for Flight Projects and Mission Success Tom Gavin.

    JPL, a division of Caltech, manages the Mars Science Laboratory project for the NASA Science Mission Directorate, Washington.

  9. How Do Structure and Charge Affect Metal-Complex Binding to DNA? An Upper-Division Integrated Laboratory Project Using Cyclic Voltammetry

    ERIC Educational Resources Information Center

    Kulczynska, Agnieszka; Johnson, Reed; Frost, Tony; Margerum, Lawrence D.

    2011-01-01

    An advanced undergraduate laboratory project is described that integrates inorganic, analytical, physical, and biochemical techniques to reveal differences in binding between cationic metal complexes and anionic DNA (herring testes). Students were guided to formulate testable hypotheses based on the title question and a list of different metal…

  10. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  11. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  12. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  13. Pedagogical Evaluation of Remote Laboratories in eMerge Project

    ERIC Educational Resources Information Center

    Lang, Daniela; Mengelkamp, Christoph; Jaeger, Reinhold S.; Geoffroy, Didier; Billaud, Michel; Zimmer, Thomas

    2007-01-01

    This study investigates opportunities for conducting electrical engineering experiments via the Internet rather than in an actual laboratory. Eighty-four French students of electrical engineering (semester 1, 2004) at Bordeaux University 1 participated in practical courses. Half of the students performed experiments in a laboratory while the other…

  14. DSN Aperture Enhancement Project Office

    NASA Technical Reports Server (NTRS)

    Marina, Miguel

    2012-01-01

    All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.

  15. 24 CFR 884.105 - Maximum total ACC commitment and project account (private-owner/PHA projects).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Maximum total ACC commitment and..., Scope and Basic Policies § 884.105 Maximum total ACC commitment and project account (private-owner/PHA projects). (a) Maximum total ACC commitment. The maximum total annual contribution that may be contracted...

  16. 24 CFR 884.105 - Maximum total ACC commitment and project account (private-owner/PHA projects).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Maximum total ACC commitment and..., Scope and Basic Policies § 884.105 Maximum total ACC commitment and project account (private-owner/PHA projects). (a) Maximum total ACC commitment. The maximum total annual contribution that may be contracted...

  17. Strategies for improving transportation project delivery performance.

    DOT National Transportation Integrated Search

    2016-09-01

    project delivery performance for the various contracting methods that are : applicable for CTDOTs use. The report is structured in two parts. Part A covers overall : project deliverability and Part B is focused on environmental review processes an...

  18. Building Skills with Reiterative Lab Projects.

    ERIC Educational Resources Information Center

    Marine, Susan Sonchik

    2003-01-01

    Introduces chemistry laboratories in which students have the opportunity to conduct laboratory projects in multiple sessions that promote planning, thinking, technical performance, and responsibility. Defines the process of experimentation and its applications to science laboratories and describes successful project applications. (YDS)

  19. Paradoxical sphincter contraction is rarely indicative of anismus

    PubMed Central

    Voderholzer, W; Neuhaus, D; Klauser, A; Tzavella, K; Muller-Lissner, S; Schindlbeck, N

    1997-01-01

    Background—Anismus is thought to be a cause of chronic constipation by producing outlet obstruction. The underlying mechanism is paradoxical contraction of the anal sphincter or puborectalis muscle. However, paradoxical sphincter contraction (PSC) also occurs in healthy controls, so anismus may be diagnosed too often because it may be based on a non-specific finding related to untoward conditions during the anorectal examination. 
Aims—To investigate the pathophysiological importance of PSC found at anorectal manometry in constipated patients and in patients with stool incontinence. 
Methods—Digital rectal examination and anorectal manometry were performed in 102 chronically constipated patients, 102 patients with stool incontinence, and in 18 controls without anorectal disease. In 120 of the 222 subjects defaecography was also performed. Paradoxical sphincter contraction was defined as a sustained increase in sphincter pressure during straining. Anismus was assumed when PSC was present on anorectal manometry and digital rectal examination and the anorectal angle did not widen on defaecography. 
Results—Manometric PSC occurred about twice as often in constipated patients as in incontinent patients (41.2% versus 25.5%, p<0.017) and its prevalence was similar in incontinent patients and controls (25.5% versus 22.2%). Oroanal or rectosigmoid transit times in constipated patients with and without PSC did not differ significantly (total 64.6 (8.9) hours versus 54.2 (8.1) hours; rectosigmoid 14.9 (2.4) hours versus 13.8 (2.5) hours). 
Conclusions—Paradoxical sphincter contraction is a common finding in healthy controls as well as in patients with chronic constipation and stool incontinence. Hence, PSC is primarily a laboratory artefact and true anismus is rare. 

 Keywords: anismus; paradoxical sphincter contraction; constipation; stool incontinence; anorectal manometry PMID:9301508

  20. Notification: Audit of Region 6's Emergency and Rapid Response Services Contracts

    EPA Pesticide Factsheets

    Project #OA-FY13-0046, March 20, 2013. The Office of Inspector General plans to begin the fieldwork phase of our audit of Region 6’s management of the Emergency and Rapid Response Services contracts.

  1. Streamlined project closeout for construction at KYTC.

    DOT National Transportation Integrated Search

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  2. NASA SBIR abstracts of 1991 phase 1 projects

    NASA Technical Reports Server (NTRS)

    Schwenk, F. Carl; Gilman, J. A.; Paige, J. B.

    1992-01-01

    The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  3. NASA SBIR abstracts of 1992, phase 1 projects

    NASA Technical Reports Server (NTRS)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.; Sacknoff, S. M.

    1993-01-01

    The objectives of 346 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1992 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 346, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1992 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  4. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  5. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  6. The Fiftieth Anniversary of Brookhaven National Laboratory: A Turbulent Time

    NASA Astrophysics Data System (ADS)

    Bond, Peter D.

    2018-03-01

    The fiftieth anniversary year of Brookhaven National Laboratory was momentous, but for reasons other than celebrating its scientific accomplishments. Legacy environmental contamination, community unrest, politics, and internal Department of Energy issues dominated the year. It was the early days of perhaps the most turbulent time in the lab's history. The consequences resulted in significant changes at the lab, but in addition they brought a change to contracts to manage the Department of Energy laboratories.

  7. The Fiftieth Anniversary of Brookhaven National Laboratory: A Turbulent Time

    NASA Astrophysics Data System (ADS)

    Bond, Peter D.

    2018-06-01

    The fiftieth anniversary year of Brookhaven National Laboratory was momentous, but for reasons other than celebrating its scientific accomplishments. Legacy environmental contamination, community unrest, politics, and internal Department of Energy issues dominated the year. It was the early days of perhaps the most turbulent time in the lab's history. The consequences resulted in significant changes at the lab, but in addition they brought a change to contracts to manage the Department of Energy laboratories.

  8. Contract Actions for Leased Equipment

    DTIC Science & Technology

    1999-06-30

    Fundamentals, Fundamentals of Contract Pricing, and Government Contract Law courses. The additional instruction should emphasize the contracting officers...Contracting Fundamentals, Fundamentals of Contract Pricing, and Government Contract Law courses. This additional instruction should emphasize the important...FAR 107.401 and 207.470 in the Basics of Contracting and Government Contract Law courses, and that price analysis in assessing lease versus purchase

  9. 40 CFR 35.4235 - Are there specific provisions my group's contract(s) must contain?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Suspension and Debarment; (g) The following clauses from 40 CFR 30.48: (1) Remedies for breaches of contract...'s contract(s) must contain? 35.4235 Section 35.4235 Protection of Environment ENVIRONMENTAL... provisions my group's contract(s) must contain? Your group must include the following provisions in each of...

  10. Massachusetts Institute of Technology Artificial Intelligence Laboratory Bibliography.

    ERIC Educational Resources Information Center

    Massachusetts Inst. of Tech., Cambridge. Artificial Intelligence Lab.

    Massachusetts Institute of Technology (MIT) presents a bibliography of more than 350 reports, theses, and papers from its artificial intelligence laboratory. Title, author, and identification number are given for all items, and most also have a date and contract number. Some items are no longer available, and others may be obtained from National…

  11. 24 CFR 402.5 - Contract renewals under section 524(b) or (e) of MAHRA.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Reengineering demonstration authority for which HUD made a determination that debt restructuring is... RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER...

  12. 24 CFR 402.5 - Contract renewals under section 524(b) or (e) of MAHRA.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Reengineering demonstration authority for which HUD made a determination that debt restructuring is... RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER...

  13. 24 CFR 402.5 - Contract renewals under section 524(b) or (e) of MAHRA.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Reengineering demonstration authority for which HUD made a determination that debt restructuring is... RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER...

  14. 24 CFR 402.5 - Contract renewals under section 524(b) or (e) of MAHRA.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Reengineering demonstration authority for which HUD made a determination that debt restructuring is... RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER...

  15. 24 CFR 402.5 - Contract renewals under section 524(b) or (e) of MAHRA.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Reengineering demonstration authority for which HUD made a determination that debt restructuring is... RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER...

  16. The Los Alamos universe: Using multimedia to promote laboratory capabilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kindel, J.

    2000-03-01

    This project consists of a multimedia presentation that explains the technological capabilities of Los Alamos National Laboratory. It takes the form of a human-computer interface built around the metaphor of the universe. The project is intended promote Laboratory capabilities to a wide audience. Multimedia is simply a means of communicating information through a diverse set of tools--be they text, sound, animation, video, etc. Likewise, Los Alamos National Laboratory is a collection of diverse technologies, projects, and people. Given the ample material available at the Laboratory, there are tangible benefits to be gained by communicating across media. This paper consists ofmore » three parts. The first section provides some basic information about the Laboratory, its mission, and its needs. The second section introduces this multimedia presentation and the metaphor it is based on along with some basic concepts of color and user interaction used in the building of this project. The final section covers construction of the project, pitfalls, and future improvements.« less

  17. Contract Learning.

    ERIC Educational Resources Information Center

    Gilbert, Jay

    Academic work carried out through learning contracts at Empire State College is described. Learning contracts are defined and examples are given. Faculty roles, educational advantages, and implementation methods are discussed. (MLH)

  18. Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Donald L.; Ramsey, Susan S.; Finn, Kevin P.

    2012-07-01

    Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiologicalmore » materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker

  19. NREL and Sandia National Laboratories (SNL) Support of Ocean Renewable Power Company's TidGen™ Power System Technology Readiness Advancement Initiative Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LiVecchi, Al

    2015-05-07

    This document summarizes the tasks identified for National Laboratory technical support of Ocean Renewable Power Corporation (ORPC) DOE grant awarded under the FY10 Industry Solicitation DE-FOA-0000293: Technology Readiness Advancement Initiative. The system ORPC will deploy in Cobscook Bay, ME is known as the TidGen™ Power System. The Turbine Generator Unit (TGU) each have a rated capacity of 150 to 175 kW, and they are mounted on bottom support frames and connected to an onshore substation using an underwater power and control cable. This system is designed for tidal energy applications in water depths from 60 to 150 feet. In fundingmore » provided separately by DOE, National Laboratory partners NREL and SNL will provide in-kind resources and technical expertise to help ensure that industry projects meet DOE WWPP (Wind and Water Power Program) objectives by reducing risk to these high value projects.« less

  20. 48 CFR 35.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... short-duration fixed-price contract may be useful for developing system design concepts, resolving... contracts as designs become more firmly established, risks are reduced, and production tooling, equipment...

  1. The Goldilocks contract: The synergistic benefits of combining structure and autonomy for persistence, creativity, and cooperation.

    PubMed

    Chou, Eileen Y; Halevy, Nir; Galinsky, Adam D; Murnighan, J Keith

    2017-09-01

    Contracts are commonly used to regulate a wide range of interactions and relationships. Yet relying on contracts as a mechanism of control often comes at a cost to motivation. Integrating theoretical perspectives from psychology, economics, and organizational theory, we explore this control-motivation dilemma inherent in contracts and present the Contract-Autonomy-Motivation-Performance-Structure (CAMPS) model, which highlights the synergistic benefits of combining structure and autonomy. The model proposes that subtle reductions in the specificity of a contract's language can boost autonomy, which increases intrinsic motivation and improves a range of desirable behaviors. Nine field and laboratory experiments found that less specific contracts increased task persistence, creativity, and cooperation, both immediately and longitudinally, because they boosted autonomy and intrinsic motivation. These positive effects, however, only occurred when contracts provided sufficient structure. Furthermore, the effects were limited to control-oriented clauses (i.e., legal clauses), and did not extend to coordination-oriented clauses (i.e., technical clauses). That is, there were synergistic benefits when a contract served as a scaffold that combined structure with general clauses. Overall, the current model and experiments identify a low-cost solution to the common problem of regulating social relationships: finding the right amount of contract specificity promotes desirable outcomes, including behaviors that are notoriously difficult to contract. The CAMPS model and the current set of empirical findings explain why, when, and how contracts can be used as an effective motivational tool. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  2. Report: Improved Contract Administration Needed for the Customer Technology Solutions Contract

    EPA Pesticide Factsheets

    Report #13-P-0398, September 16, 2013. Based on our review of the WCF contract EPW08034, which ended September 2012, the EPA needs to improve its contract administration to assist in managing other similar type contracts.

  3. Risks Associated with Federal Construction Projects

    DTIC Science & Technology

    2011-06-01

    awarding contracts for construction projects (USACE, 2010). BIM offers a method to effectively design a facility while maximizing work performance during...includes Requirements, Programming, Funding, Solicitation, AEC Evaluation, Award , Project Validation, Design and Construction, and Project Management...includes the Solicitation, AEC Evaluation, and Award Steps. In this Phase, BIM is only used in the Solicitation and the AEC Evaluation steps

  4. 23 CFR 710.313 - Design-build projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Design-build projects. 710.313 Section 710.313 Highways... REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build...-way acquisition and clearance services may be incorporated into the design-build contract if allowed...

  5. 23 CFR 710.313 - Design-build projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Design-build projects. 710.313 Section 710.313 Highways... REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build...-way acquisition and clearance services may be incorporated into the design-build contract if allowed...

  6. 23 CFR 710.313 - Design-build projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Design-build projects. 710.313 Section 710.313 Highways... REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build...-way acquisition and clearance services may be incorporated into the design-build contract if allowed...

  7. Laboratory Directed Research and Development FY2008 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kammeraad, J E; Jackson, K J; Sketchley, J A

    The Laboratory Directed Research and Development (LDRD) Program, authorized by Congress in 1991 and administered by the Institutional Science and Technology Office at Lawrence Livermore, is our primary means for pursuing innovative, long-term, high-risk, and potentially high-payoff research that supports the full spectrum of national security interests encompassed by the missions of the Laboratory, the Department of Energy, and National Nuclear Security Administration. The accomplishments described in this annual report demonstrate the strong alignment of the LDRD portfolio with these missions and contribute to the Laboratory's success in meeting its goals. The LDRD budget of $91.5 million for fiscal yearmore » 2008 sponsored 176 projects. These projects were selected through an extensive peer-review process to ensure the highest scientific quality and mission relevance. Each year, the number of deserving proposals far exceeds the funding available, making the selection a tough one indeed. Our ongoing investments in LDRD have reaped long-term rewards for the Laboratory and the nation. Many Laboratory programs trace their roots to research thrusts that began several years ago under LDRD sponsorship. In addition, many LDRD projects contribute to more than one mission area, leveraging the Laboratory's multidisciplinary team approach to science and technology. Safeguarding the nation from terrorist activity and the proliferation of weapons of mass destruction will be an enduring mission of this Laboratory, for which LDRD will continue to play a vital role. The LDRD Program is a success story. Our projects continue to win national recognition for excellence through prestigious awards, papers published in peer-reviewed journals, and patents granted. With its reputation for sponsoring innovative projects, the LDRD Program is also a major vehicle for attracting and retaining the best and the brightest technical staff and for establishing collaborations with universities

  8. Developing a lean culture in the laboratory.

    PubMed

    Napoles, Leyda; Quintana, Maria

    2006-07-25

    The Director of Pathology at Jackson Memorial Hospital was interested in improving the operational efficiencies of the department in order to enhance the department's level of service in conjunction with the expansion of the overall health system. The decision was made to implement proven Lean practices in the laboratory under the direction of a major consulting firm. This article details the scope of the initial project as well as the operating principles of Lean manufacturing practices as applied to the clinical laboratory. The goals of the project were to improve turnaround times of laboratory results, reduce inventory and supply costs, improve staff productivity, maximize workflow, and eliminate waste. Extensive data gathering and analysis guided the work process by highlighting the areas of highest opportunity. This systematic approach resulted in recommendations for the workflow and physical layout of the laboratory. It also included the introduction of "standard workflow" and "visual controls" as critical items that streamlined operational efficiencies. The authors provide actual photographs and schematics of the reorganization and improvements to the physical layout of the laboratory. In conclusion, this project resulted in decreased turnaround times and increased productivity, as well as significant savings in the overall laboratory operations.

  9. Customer Satisfaction Assessment at the Pacific Northwest National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, Dale N.; Sours, Mardell L.

    2000-03-20

    The Pacific Northwest National Laboratory (PNNL) is developing and implementing a customer satisfaction assessment program (CSAP) to assess the quality of research and development provided by the laboratory. We present the customer survey component of the PNNL CSAP. The customer survey questionnaire is composed of 2 major sections, Strategic Value and Project Performance. The Strategic Value section of the questionnaire consists of 5 questions that can be answered with a 5 point Likert scale response. These questions are designed to determine if a project is directly contributing to critical future national needs. The Project Performance section of the questionnaire consistsmore » of 9 questions that can be answered with a 5 point Likert scale response. These questions determine PNNL performance in meeting customer expectations. Many approaches could be used to analyze customer survey data. We present a statistical model that can accurately capture the random behavior of customer survey data. The properties of this statistical model can be used to establish a "gold standard'' or performance expectation for the laboratory, and then assess progress. The gold standard is defined from input from laboratory management --- answers to 4 simple questions, in terms of the information obtained from the CSAP customer survey, define the standard: *What should the average Strategic Value be for the laboratory project portfolio? *What Strategic Value interval should include most of the projects in the laboratory portfolio? *What should average Project Performance be for projects with a Strategic Value of about 2? *What should average Project Performance be for projects with a Strategic Value of about 4? We discuss how to analyze CSAP customer survey data with this model. Our discussion will include "lessons learned" and issues that can invalidate this type of assessment.« less

  10. How to compete for NASA contracts

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Various studies and NASA experience have found that business concerns can provide a vital and significant impetus to technological innovation, not only in the fields of space and aeronautics, but also in national technological growth. NASA personnel are determined to foster the development of small business capabilities in technical areas that will support future projects and establish a small business base for the development and production of flight hardware for future missions. The solicitation process for Federal contracts has grown quite complex over the years. Where possible, we continue to try to simplify and streamline procedures for obtaining and performing these contracts. This booklet is designed to help understand NASA solicitations, find the information needed in deciding whether to respond, and improve chances for success. The first section of this booklet will answer general questions concerning the various types of NASA solicitations. Your specific questions on how to prepare bids will be answered in the second section, which is followed by a third section on the unique features of construction contracting. A fourth section describes how to submit technical and cost proposals for the negotiated procurement process. Some tips or suggestions, called DO's and DONT's, are placed at the end of the second, third, and fourth sections. Then, in the fifth section, ways to seek business as a subcontractor are identified.

  11. SDN Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Rhett

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustainmore » critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  12. Observational and numerical studies of extreme frontal scale contraction

    NASA Technical Reports Server (NTRS)

    Koch, Steven E.

    1995-01-01

    The general objective of this effort is to increase understanding of how frontal scale contraction processes may create and sustain intense mesoscale precipitation along intensifying cold fronts. The five-part project (an expansion of the originally proposed two-part project) employed conventional meteorological data, special mesoscale data, remote sensing measurements, and various numerical models. First an idealized hydrostatic modeling study of the scale contraction effects of differential cloud cover on low-level frontal structure and dynamics was completed and published in a peer-reviewed journal. The second objective was to complete and publish the results from a three dimensional numerical model simulation of a cold front in which differential sensible heating related to cloud coverage patterns was apparently crucial in the formation of a severe frontal squall line. The third objective was to use a nonhydrostatic model to examine the nonlinear interactions between the transverse circulation arising from inhomogeneous cloud cover, the adiabatic frontal circulation related to semi-geostrophic forcing, and diabatic effects related to precipitation processes, in the development of a density current-like microstructure at the leading edge of cold fronts. Although the development of a frontal model that could be used to initialize such a primitive equation model was begun, we decided to focus our efforts instead on a project that could be successfully completed in this short time, due to the lack of prospects for continued NASA funding beyond this first year (our proposal was not accepted for future funding). Thus, a fourth task was added, which was to use the nonhydrostatic model to test tentative hypotheses developed from the most detailed observations ever obtained on a density current (primarily sodar and wind profiler data). These simulations were successfully completed, the findings were reported at a scientific conference, and the results have recently been

  13. Culturally appropriate organization of water and sewerage projects built through public private partnerships

    PubMed Central

    2017-01-01

    This paper contributes to the pursuit of socially sustainable water and sanitation infrastructure for all people by discovering statistically robust relationships between Hofstede’s dimensions of cross-cultural comparison and the choice of contract award types, project type, and primary revenue sources. This analysis, which represents 973 projects distributed across 24 low- and middle-income nations, uses a World Bank dataset describing high capital cost water and sewerage projects funded through private investment. The results show that cultural dimensions explain variation in the choice of contract award types, project type, and primary revenue sources. These results provide empirical evidence that strategies for water and sewerage project organization are not culturally neutral. The data show, for example, that highly individualistic contexts are more likely to select competitive contract award types and to depend on user fees to provide the primary project revenue stream post-construction. By selecting more locally appropriate ways to organize projects, project stakeholders will be better able to pursue the construction of socially sustainable water and sewerage infrastructure. PMID:29200432

  14. An Environmentally Focused General Chemistry Laboratory

    ERIC Educational Resources Information Center

    Mihok, Morgan; Keiser, Joseph T.; Bortiatynski, Jacqueline M.; Mallouk, Thomas E.

    2006-01-01

    The environmentally focused general chemistry laboratory provides a format for teaching the concepts of the mainstream laboratory within an environmental context. The capstone integrated exercise emerged as the overwhelming favorite part of this laboratory and the experiment gave students an opportunity to do a self-directed project, using the…

  15. Student Support using Project Adventure

    NASA Astrophysics Data System (ADS)

    Kawanishi, Toshimasa

    University students become maladjustment at the time of entrance to school not to have friends. Project adventure is effective in the making of friend and brings up confidence with persons. General concepts of project adventure make from experimental learning cycle, full value contract and challenge by choice. This paper explains purpose of PA, practice, ice breaking, trust and initiative.

  16. Integrative Cardiac Health Project (ICHP)

    DTIC Science & Technology

    2017-04-01

    AWARD NUMBER: W81XWH-16-2-0007 TITLE: Integrative Cardiac Health Project (ICHP) PRINCIPAL INVESTIGATOR: COL (Ret) Marina N. Vernalis, MC, USA...2017 4. TITLE AND SUBTITLE Integrative Cardiac Health Project (ICHP) 5a. CONTRACT NUMBER 5b. GRANT NUMBER W81XWH-16-2-0007 5c. PROGRAM ELEMENT...Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT The Integrative Cardiac Health Project (ICHP) aims to lead the way in Cardiovascular Disease (CVD

  17. Competitiveness Improvement Project Informational Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sinclair, Karin C; Preus, Robert W; Dana, Scott

    This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

  18. Final Technical Report for contract number DE-FG02-05ER15670

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glazebrook, Jane

    This is the final technical report for contract number DE-FG02-05ER15670. The project is now complete, and results of the project have been published. Two papers were published based on work done in the last three-year funding period. The DOIs of these papers are included below. The abstracts of the papers, providing summaries of the work, are included in the body of the report.

  19. Teaching about Contracts.

    ERIC Educational Resources Information Center

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  20. 48 CFR 1517.204 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracts. 1517.204 Section 1517.204 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 1517.204 Contracts. The SCM may approve a contract with...