Science.gov

Sample records for lakes technical progress

  1. Dissolved organic matter and lake metabolism. Technical progress report, 1 July 1979-30 June 1980

    SciTech Connect

    Wetzel, R.G.

    1980-01-01

    Progress in research to evaluate the impact of utilization of fossil fuels on surface water is reported. Analyses of regulatory mechanisms of growth and rates of carbon cycling center on evaluation of quantitative control interactions among the microflora of the pelagial zones of several lakes of progressively greater eutrophy, littoral photosynthetic producer-decomposer complex, and allochthonous inorganic-organic influxes and their biotic processing. The underlying thesis is that quantification of the dynamic carbon fluxes among these components and their rate control mechanisms by physical and chemical factors are fundamental to elucidation of the rate functions of lake eutrophication. A major portion of the research has been directed towards the fate and nutrient mechanisms regulating qualitative and quantitative utilization and losses of organic carbon synthesized within lakes and their drainage basins. It has become increasingly apparent that the wetland and littoral flora, and attendant epiphytic and benthic microflora, have major regulatory controls on biogeochemical cycling of whole lake systems. A major effort on factors regulating the metabolism of littoral macrophytes and attached algae has been coupled to integrated studies on their decomposition and the fate of detrital dissolved and particulate organic matter. These organic products are being coupled to influences on enzymatic activity and inorganic nutrient cycling.

  2. Progress toward lake trout restoration in Lake Michigan

    USGS Publications Warehouse

    Holey, Mark E.; Rybicki, Ronald W.; Eck, Gary W.; Brown, Edward H.; Marsden, J. Ellen; Lavis, Dennis S.; Toneys, Michael L.; Trudeau, Tom N.; Horrall, Ross M.

    1995-01-01

    Progress toward lake trout restoration in Lake Michigan is described through 1993. Extinction of the native lake trout fishery by sea lamprey predation, augmented by exploitation and habitat destruction, resulted in an extensive stocking program of hatchery-reared lake trout that began in 1965. Sea lamprey abundance was effectively controlled using selective chemical toxicants. The initial stocking produced a measurable wild year class of lake trout by 1976 in Grand Traverse Bay, but failed to continue probably due to excessive exploitation. The overall lack of successful reproduction lakewide by the late 1970s led to the development and implementation in 1985 of a focused inter-agency lakewide restoration plan by a technical committee created through the Lake Committee structure of the Great Lakes Fishery Commission. Strategies implemented in 1985 by the plan included setting a 40% total mortality goal lakewide, creating two large refuges designed to encompass historically the most productive spawning habitat and protect trout stocked over their home range, evaluating several lake trout strains, and setting stocking priorities throughout the lake. Target levels for stocking in the 1985 Plan have never been reached, and are much less than the estimated lakewide recruitment of yearlings by the native lake trout stocks. Since 1985, over 90% of the available lake trout have been stocked over the best spawning habitat, and colonization of the historically productive offshore reefs has occurred. Concentrations of spawning lake trout large enough for successful reproduction, based on observations of successful hatchery and wild stocks, have developed at specific reefs. Continued lack of recruitment at these specific sites suggests that something other than stotk abundance has limited success. Poor survival of lake trout eggs, assumed to be related to contaminant burden, occurred in the late 1970s and early 1980s, but survival has since increased to equal survival in the

  3. Dissolved organic matter and lake metabolism: biogeochemistry and controls of nutrient flux dynamics in lakes. Technical progress report, 1 July 1980-1 June 1981

    SciTech Connect

    Wetzel, R.G.

    1981-01-01

    These continuing investigations focus on integrated studies of the qualitative and quantitative cycling and metabolism of particulate and dissolved organic carbon in lakes and their inflow sources (surface and subsurface). Emphasis is placed on the sources, fates, and interactions of dissolved and particulate organic matter in relation to: inorganic chemical cycling, allochthonous loading to the lake system, and the coupled nutrient physiology and metabolism of phytoplankton, bacterial populations, macrophytes, and attendant sessile algal-bacterial communities. Regulatory mechanisms of growth and rates of carbon and nutrient cycling are being evaluated among the inorganic-organic influxes of allochthonous sources as they are controlled by wetland-littoral communities, the littoral photosynthetic producer-decomposer complex, and the microflora of the pelagial zone. The integrated studies addressing these multifaceted objectives are summarized in a detailed outline.

  4. The Impact of the Adequate Yearly Progress Requirement of the Federal "No Child Left Behind" Act on Schools in the Great Lakes Region. Technical Appendix

    ERIC Educational Resources Information Center

    Wiley, Edward W.; Allen, Jessica

    2005-01-01

    This appendix describes the analytical procedures used to project the status of schools in the Great Lakes state toward meeting AYP (Adequate Yearly Progress) requirements from 2005 to 2014. To "make AYP," the school as a whole and each numerically significant subgroup must meet "Annual Measurable Objectives" (annual…

  5. Mariano Lake Mine: Technical Reports

    EPA Pesticide Factsheets

    This Final Removal Site Evaluation describes the objectives, work performed, and results of a Removal Site Evaluation (RSE) at the Mariano Lake Mine, which was performed by ARCADIS U.S., Inc. on behalf of Chevron Environmental Management Company.

  6. Annual Technical Progress Report

    SciTech Connect

    Ayman I. Hawari

    2002-10-02

    This report describes the results generated during phase 1 of this project. During this phase, the main tools that are used to compute the thermal neutron scattering kernels for graphite, beryllium, beryllium oxide, zirconium hydride, light water, polyethylene were implemented and tested. This includes a modified NJOY/LEAPR code system, the GASKET code, and the ab initio condensed matter codes VASP and PHONON. Thermal neutron scattering kernels were generated for graphite, beryllium, beryllium oxide. In the case of graphite, new phonon spectra were examined. The first is a spectrum based on experiments performed at Oak Ridge National Laboratory in the early seventies, and the second is generated using the ab initio methods. In the case of beryllium, and beryllium oxide, a synthetic approach for generating the phonon spectra was implemented. In addition, significant progress was made on an experiment to benchmark the graphite scattering kernels was made. The simulations of this experiment show that differences on the order of a few percent, in Pu-239 detector responses, can be expected due to the use of different scattering kernels. (B204) NOT A FINAL REPORT

  7. Technical progress report

    SciTech Connect

    1996-10-01

    This report summarizes experimental and theoretical work in basic nuclear physics carried out between October 1, 1995, the closing of our last Progress Report, and September 30, 1996 at the Nuclear Physics Laboratory of the University of Colorado, Boulder, under contracts DE-FG03-93ER-40774 and DE-FG03-95ER-40913 with the United States Department of Energy. The experimental contract supports broadly-based experimental research in intermediate energy nuclear physics. This report includes results from studies of Elementary Systems involving the study of the structure of the nucleon via polarized high-energy positron scattering (the HERMES experiment) and lower energy pion scattering from both polarized and unpolarized nucleon targets. Results from pion- and kaon-induced reactions in a variety of nuclear systems are reported under the section heading Meson Reactions; the impact of these and other results on understanding the nucleus is presented in the Nuclear Structure section. In addition, new results from scattering of high-energy electrons (from CEBAF/TJNAF) and pions (from KEK) from a broad range of nuclei are reported in the section on Incoherent Reactions. Finally, the development and performance of detectors produced by the laboratory are described in the section titled Instrumentation.

  8. Lake States regional forest resources assessment: technical papers.

    Treesearch

    Henry H. Webster; J. Michael Vasievich

    1997-01-01

    Contains 21 technical working papers prepared for the Lake States regional forest resources assessment, Lake States Forestry Alliance 1995. They represent significant contributions from many individuals and organizations and form the technical background for the assessment.

  9. Lake states regional forest resources assessments: Technical papers. Forest Service general technical report

    SciTech Connect

    Webster, H.H.; Vasievich, J.M.

    1997-07-23

    Contains 21 technical working papers prepared for the Lake States regional forest resources assessment, Lake States Forestry Alliance 1995. They represent significant contributions from many individuals and organizations and form the technical background for the Assessment.

  10. Technical Progress of Inkjet Papers

    NASA Astrophysics Data System (ADS)

    Tokunaga, Yukio

    This article overviews the development of Ink Jet Paper along with that of ink jet printing technology. Structure and composition of various ink jet paper grades are summarized with the technical needs behind (e.g. dot size control, absorption speed, absorption capacity, and image stability).

  11. Onondaga Lake, New York. Technical Annex

    DTIC Science & Technology

    1992-03-01

    some of the industries were improving their treatment processes , others were creating new problems for the lake. Crucible Steel Company constructed a...and copper to the Lake. Prior to 1974, these metals were not treated, however, the construction of an industrial wastewater reuse and treatment plant...Metals (Copper, Lead) 6. Trib. SA Treated Wastewater (Crucible Steel) (Minor) Reduced Loadings now - Industrial Wastewater Reuse and Treatment

  12. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical...

  13. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical...

  14. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical...

  15. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical...

  16. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical...

  17. Technical report, Onondaga Lake, New York. Main report. Final report

    SciTech Connect

    Not Available

    1992-01-01

    This technical report on Onondaga Lake, New York has compiled existing data to determine which water quality and environmental enhancements are advisable. The report identifies sediment and water quality problems and needs, potential clean-up methodologies, fisheries and fish habitat improvements, and water quality improvements.

  18. Onondaga Lake, New York. Technical annex. Final report

    SciTech Connect

    Not Available

    1992-03-01

    This technical report on Onondaga Lake, New York has compiled existing data to determine which water quality and environmental enhancements are advisable. The report identifies sediment and water quality problems and needs, potential clean-up methodologies, fisheries and fish habitat improvements, and water quality improvements.

  19. Embryonic developmental progression in lake trout (Salvelinus namaycush) (Walbaum, 1792) and its relation to lake temperature

    USGS Publications Warehouse

    Allen, Jeffrey D.; Walker, Glenn K.; Adams, Jean V.; Nichols, S. Jerrine; Edsall, Carol C.

    2005-01-01

    Developmental progression of lake trout (Salvelinus namaycush) embryos was examined with light and scanning electron microscopy. From this examination, key developmental stages were described in detail. The key developmental stages were then applied to individual lake trout egg lots incubated in constant temperatures of 2, 4, 6, 8, and 10°C. We used Belehradek's, Thermodynamic, and Power models, and also developed the Zero model to determine stage specific developmental rates of lake trout eggs for each background temperature. From the models, hatch dates and staging were predicted for temperature regimes from Lake Superior (1990–91) and Lake Huron (1996–97). Based on the existing lake temperature data and the observed spawning dates, the Zero and the Power models predict that post peak spawning may contribute significantly to overall recruitment success for these years.

  20. Sludge Treatment Evaluation: 1992 Technical progress

    SciTech Connect

    Silva, L J; Felmy, A R; Ding, E R

    1993-01-01

    This report documents Fiscal Year 1992 technical progress on the Sludge Treatment Evaluation Task, which is being conducted by Pacific Northwest Laboratory. The objective of this task is to develop a capability to predict the performance of pretreatment processes for mixed radioactive and hazardous waste stored at Hanford and other US Department of Energy (DOE) sites. Significant cost savings can be achieved if radionuclides and other undesirable constituents can be effectively separated from the bulk waste prior to final treatment and disposal. This work is initially focused on chemical equilibrium prediction of water washing and acid or base dissolution of Hanford single-shell tank (SST) sludges, but may also be applied to other steps in pretreatment processes or to other wastes. Although SST wastes contain many chemical species, there are relatively few constituents -- Na, Al, NO[sub 3], NO[sub 2], PO[sub 4], SO[sub 4], and F -- contained in the majority of the waste. These constituents comprise 86% and 74% of samples from B-110 and U-110 SSTS, respectively. The major radionuclides of interest (Cs, Sr, Tc, U) are present in the sludge in small molal quantities. For these constituents, and other important components that are present in small molal quantities, the specific ion-interaction terms used in the Pitzer or NRTL equations may be assumed to be zero for a first approximation. Model development can also be accelerated by considering only the acid or base conditions that apply for the key pretreatment steps. This significantly reduces the number of chemical species and chemical reactions that need to be considered. Therefore, significant progress can be made by developing all the specific ion interactions for a base model and an acid dissolution model.

  1. Technical progress by major task. Semiannual technical progress report, September 29, 1997--March 29, 1998

    SciTech Connect

    1998-04-01

    The technical progress achieved during the period 29 September 1997 through 29 March 1998 on Contract DE-AC03-91SF18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described in this report. The report is organized by program task structure: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; RTG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair.

  2. Progress in Scientific and Technical Communications, 1968 Annual Report.

    ERIC Educational Resources Information Center

    Federal Council for Science and Technology, Washington, DC. Committee on Scientific and Technical Information.

    This sixth annual report describes progress achieved by the Federal Government in improving the communication of scientific and technical information to support and enhance national science and technology. Included in the report are details regarding the scientific and technical activities of individual Federal Agencies, such as the Atomic Energy…

  3. Solar lease grant program. Technical progress report

    SciTech Connect

    Not Available

    1981-04-01

    Progress on a lease program for the installation of a solar water heater with no installation charge is reported. Information on the announcement of the program, the selection of participants, the contractural agreement, progress on installation of equipment, monitoring, and evaluation is summarized. The status of the budget concerned with the program is announced. Forms used for applications for the program and an announcement from Resource Alternatives for Cilco customers are presented.

  4. Final Technical Progress Report NANOSTRUCTURED MAGNETIC MATERIALS

    SciTech Connect

    Charles M. Falco

    2012-09-13

    This report describes progress made during the final phase of our DOE-funded program on Nanostructured Magnetic Materials. This period was quite productive, resulting in the submission of three papers and presentation of three talks at international conferences and three seminars at research institutions. Our DOE-funded research efforts were directed toward studies of magnetism at surfaces and interfaces in high-quality, well-characterized materials prepared by Molecular Beam Epitaxy (MBE) and sputtering. We have an exceptionally well-equipped laboratory for these studies, with: Thin film preparation equipment; Characterization equipment; Equipment to study magnetic properties of surfaces and ultra-thin magnetic films and interfaces in multi-layers and superlattices.

  5. Technical Entrepreneurship and Technological Progress in Developing Countries.

    ERIC Educational Resources Information Center

    Quevedo-Procel, Jose

    This paper describes the Mexican economic environment in terms of general economic conditions from the 1940s to the present, the role of science and technology in industrial progress, and the promotion and support of small companies. The technical entrepreneur is identified as the missing link that would play an important part in the technological…

  6. Assessment Program Technical Progress Report, 1996-1997.

    ERIC Educational Resources Information Center

    McCown, Laurie; Fanning, Erin; Eickmeyer, Barbara

    Coconino Community College (CCC) annually assesses its institutional effectiveness to demonstrate its commitment to improving programs and services to students. The 1996-97 Assessment Program Technical Progress Report records the assessment and institutional activities enacted during the academic year, detailing the assessment model, timelines,…

  7. Technical Entrepreneurship and Technological Progress in Developing Countries.

    ERIC Educational Resources Information Center

    Quevedo-Procel, Jose

    This paper describes the Mexican economic environment in terms of general economic conditions from the 1940s to the present, the role of science and technology in industrial progress, and the promotion and support of small companies. The technical entrepreneur is identified as the missing link that would play an important part in the technological…

  8. Prop-Fan technical progress leading to technology readiness

    SciTech Connect

    Gatzen, B.S.; Adamson, W.M.

    1981-01-01

    Technical activity on Prop-Fan propulsion has reached an impotant milestone. The analytical and scale model efforts now provide verification of design techniques necessary to initiate the large scale rotor technology demonstration required to achieve Prop-Fan technology readiness. Small scale model rotor programs have demonstrated high uninstalled Prop-Fan efficiency, reduced source noise with swept blades, and satisfactory structural dynamics. This paper presents the technical progress to date and the need to conduct a large scale program. The key element of the large scale program is a high speed flight test of the Prop-Fan rotor mounted on a swept wing. 74 refs.

  9. Lake Granbury and Lake Whitney Assessment Initiative Final Scientific/Technical Report Summary

    SciTech Connect

    Harris, B. L.; Roelke, Daniel; Brooks, Bryan; Grover, James

    2010-10-11

    A team of Texas AgriLife Research, Baylor University and University of Texas at Arlington researchers studied the biology and ecology of Prymnesium parvum (golden algae) in Texas lakes using a three-fold approach that involved system-wide monitoring, experimentation at the microcosm and mesocosm scales, and mathematical modeling. The following are conclusions, to date, regarding this organism's ecology and potential strategies for mitigation of blooms by this organism. In-lake monitoring revealed that golden algae are present throughout the year, even in lakes where blooms do not occur. Compilation of our field monitoring data with data collected by Texas Parks and Wildlife and Brazos River Authority (a period spanning a decade) revealed that inflow and salinity variables affect bloom formations. Thresholds for algae populations vary per lake, likely due to adaptations to local conditions, and also to variations in lake-basin morphometry, especially the presence of coves that may serve as hydraulic storage zones for P. parvum populations. More specifically, our in-lake monitoring showed that the highly toxic bloom that occurred in Lake Granbury in the winter of 2006/2007 was eliminated by increased river inflow events. The bloom was flushed from the system. The lower salinities that resulted contributed to golden algae not blooming in the following years. However, flushing is not an absolute requirement for bloom termination. Laboratory experiments have shown that growth of golden algae can occur at salinities ~1-2 psu but only when temperatures are also low. This helps to explain why blooms are possible during winter months in Texas lakes. Our in-lake experiments in Lake Whitney and Lake Waco, as well as our laboratory experiments, revealed that cyanobacteria, or some other bacteria capable of producing algicides, were able to prevent golden algae from blooming. Identification of this organism is a high priority as it may be a key to managing golden algae blooms

  10. Great Lakes Area Resource Center. Final Technical Report. June 1, 1974-May 31, 1977.

    ERIC Educational Resources Information Center

    Wisconsin State Dept. of Public Instruction, Madison.

    The final technical report of the Great Lakes Regional Resource Center summarizes special education activities in five major areas: state program development, educational appraisal, educational programing, sharing resources, and project accountability and administration. Explained are project goals of enhancing development, demonstration,…

  11. Solar thermal power systems. Annual technical progress report, FY 1979

    SciTech Connect

    Braun, Gerald W.

    1980-06-01

    The Solar Thermal Power Systems Program is the key element in the national effort to establish solar thermal conversion technologies within the major sectors of the national energy market. It provides for the development of concentrating mirror/lens heat collection and conversion technologies for both central and dispersed receiver applications to produce electricity, provide heat at its point of use in industrial processes, provide heat and electricity in combination for industrial, commercial, and residential needs, and ultimately, drive processes for production of liquid and gaseous fuels. This report is the second Annual Technical Progress Report for the Solar Thermal Power Systems Program and is structured according to the organization of the Solar Thermal Power Systems Program on September 30, 1979. Emphasis is on the technical progress of the projects rather than on activities and individual contractor efforts. Each project description indicates its place in the Solar Thermal Power Systems Program, a brief history, the significant achievements and real progress during FY 1979, also future project activities as well as anticipated significant achievements are forecast. (WHK)

  12. International Linear Collider-A Technical Progress Report

    SciTech Connect

    Elsen, Eckhard; Harrison, Mike; Hesla, Leah; Ross, Marc; Royole-Degieux, Perrine; Takahashi, Rika; Walker, Nicholas; Warmbein, Barbara; Yamamoto, Akira; Yokoya, Kaoru; Zhang, Min; /Beijing, Inst. High Energy Phys.

    2011-11-04

    The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

  13. Environmental Research Division technical progress report, January 1984-December 1985

    SciTech Connect

    Not Available

    1986-05-01

    Technical progress in the various research and assessment activities of Argonne National Laboratory's Environmental Research Division is reported for the period 1984 to 1985. Textual, graphic, and tabular information is used to briefly summarize (in separate chapters) the work of the Division's Atmospheric Physics, Environmental Effects Research, Environmental Impacts, Fundamental Molecular Physics and Chemistry, and Waste Management Programs. Information on professional qualifications, awards, and outstanding professional activities of staff members, as well as lists of publications, oral presentations, special events organized, and participants in educational programs, are provided in appendices at the end of each chapter.

  14. Thermal energy storage technical progress report, April 1990--March 1991

    SciTech Connect

    Tomlinson, J.J.

    1992-03-01

    The Department of Energy (DOE) is supporting development of thermal energy storage (TES) as a means of efficiently coupling energy supplies to variable heating or cooling demands. Uses of TES include electrical demand-side management in buildings and industry, extending the utilization of renewable energy resources such as solar, and recovery of waste heat from periodic industrial processes. Technical progress to develop TES for specific diurnal and industrial applications under Oak Ridge National Laboratory`s TES program from April 1990 to March 1992 is reported and covers research in the areas of low temperature sorption, direct contact ice making, latent heat storage plasterboard and latent/sensible heat regenerator technology development.

  15. Thermal energy storage technical progress report, April 1990--March 1991

    SciTech Connect

    Tomlinson, J.J.

    1992-03-01

    The Department of Energy (DOE) is supporting development of thermal energy storage (TES) as a means of efficiently coupling energy supplies to variable heating or cooling demands. Uses of TES include electrical demand-side management in buildings and industry, extending the utilization of renewable energy resources such as solar, and recovery of waste heat from periodic industrial processes. Technical progress to develop TES for specific diurnal and industrial applications under Oak Ridge National Laboratory's TES program from April 1990 to March 1992 is reported and covers research in the areas of low temperature sorption, direct contact ice making, latent heat storage plasterboard and latent/sensible heat regenerator technology development.

  16. Habitat Evaluation Procedures (HEP) Report; Beaver Lake, Technical Report 2005.

    SciTech Connect

    Entz, Ray

    2005-05-01

    On August 14, 2003, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Beaver Lake property, an acquisition completed by the Kalispel Tribe of Indians in November 2002. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Beaver Lake Project provides a total of 232.26 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 136.58 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Forested wetland habitat provides 20.02 HUs for bald eagle, black-caped chickadee, mallard, and white-tailed deer. Scrub-shrub wetland habitat provides 7.67 HUs for mallard, yellow warbler, and white-tailed deer. Grassland meadow provides 22.69 HUs for Canada goose and mallard. Emergent wetlands provide 35.04 HUs for Canada goose, mallard, and muskrat. Open water provided 10.26 HUs for Canada goose, mallard, and muskrat. The objective of using HEP at the Beaver Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  17. Habitat Evaluation Procedures (HEP) Report; Gamblin Lake, Technical Report 2005.

    SciTech Connect

    Entz, Ray

    2005-05-01

    On August 12, 2003, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Gamblin Lake property, an acquisition completed by the Kalispel Tribe of Indians in December 2002. Evaluation species and appropriate models include bald eagle, black-capped chickadee, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Gamblin Lake Project provides a total of 273.28 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 127.92 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Forested wetland habitat provides 21.06 HUs for bald eagle, black-caped chickadee, mallard, and white-tailed deer. Wet meadow provides 78.05 HUs for Canada goose and mallard. Emergent wetland habitat provides 46.25 HUs for mallard, muskrat, and Canada goose. The objective of using HEP at the Gamblin Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  18. OTEC support services. Quarterly technical progress report No. 16, 15 February 1982-14 May 1982

    SciTech Connect

    Not Available

    1982-05-01

    Technical progress is reported in the area of OTEC program survey, analysis, evaluation, and recommendation concerning program performance, including OTEC commercialization support and program technical engineering and instrumentation analysis. Progress is also reported in the areas of program technical monitoring, OTEC system integration, and transmission subsystem considerations. Participation in meetings, conferences, etc. is also reported. (LEW)

  19. Arrow Lakes Reservoir Fertilization Experiment, Technical Report 1999-2004.

    SciTech Connect

    Schindler, E.

    2007-02-01

    The Arrow Lakes food web has been influenced by several anthropogenic stressors during the past 45 years. These include the introduction of mysid shrimp (Mysis relicta) in 1968 and 1974 and the construction of large hydroelectric impoundments in 1969, 1973 and 1983. The construction of the impoundments affected the fish stocks in Upper and Lower Arrow lakes in several ways. The construction of Hugh Keenleyside Dam (1969) resulted in flooding that eliminated an estimated 30% of the available kokanee spawning habitat in Lower Arrow tributaries and at least 20% of spawning habitat in Upper Arrow tributaries. The Mica Dam (1973) contributed to water level fluctuations and blocked upstream migration of all fish species including kokanee. The Revelstoke Dam (1983) flooded 150 km of the mainstem Columbia River and 80 km of tributary streams which were used by kokanee, bull trout, rainbow trout and other species. The construction of upstream dams also resulted in nutrient retention which ultimately reduced reservoir productivity. In Arrow Lakes Reservoir (ALR), nutrients settled out in the Revelstoke and Mica reservoirs, resulting in decreased productivity, a process known as oligotrophication. Kokanee are typically the first species to respond to oligotrophication resulting from aging impoundments. To address the ultra-oligotrophic status of ALR, a bottom-up approach was taken with the addition of nutrients (nitrogen and phosphorus in the form of liquid fertilizer from 1999 to 2004). Two of the main objectives of the experiment were to replace lost nutrients as a result of upstream impoundments and restore productivity in Upper Arrow and to restore kokanee and other sport fish abundance in the reservoir. The bottom-up approach to restoring kokanee in ALR has been successful by replacing nutrients lost as a result of upstream impoundments and has successfully restored the productivity of Upper Arrow. Primary production rates increased, the phytoplankton community responded

  20. OTEC support services. Quarterly technical progress report No. 17, 15 May 1982-14 August 1982

    SciTech Connect

    1982-08-01

    Progress relative to accomplishments and relative to meetings, conferences, etc. are reported in the areas of OTEC commercialization support, program technical engineering and instrumentation analysis, technical and management services, OTEC system integration, and transmission subsystem considerations. (LEW)

  1. OTEC support services. Quarterly technical progress report No. 11, 15 November 1980-14 February 1981

    SciTech Connect

    1981-02-01

    Technical engineering and management support services for the Ocean Thermal Energy Conversion Program are listed along with their objectives. Progress is reported on the following: technical assessments, OTEC system integration, environment and siting considerations, and transmission subsystem considerations. (MHR)

  2. Thermal energy storage technical progress report, April 1992--March 1993

    SciTech Connect

    Olszewski, M.

    1993-05-01

    The Department of Energy (DOE) is supporting development of thermal energy storage (TES) as a means of efficiently coupling energy supplies to variable heating or cooling demands. Uses of TES include electrical demand-side management in buildings and industry, extending the utilization of renewable energy resources such as solar, and recovery of waste heat from periodic industrial processes. Technical progress to develop TES for specific diurnal and industrial applications under the Oak Ridge National Laboratory`s TES program from April 1992 to March 1993 is reported and covers research in the areas of low temperature sorption, thermal energy storage water heater, latent heat storage wallboard and latent/sensible heat regenerator technology development.

  3. 76 FR 47613 - Board Meeting: September 13-14, 2011-Salt Lake City, UT; the U.S. Nuclear Waste Technical Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... REVIEW BOARD Board Meeting: September 13-14, 2011--Salt Lake City, UT; the U.S. Nuclear Waste Technical... Technical Review Board will hold a public meeting in Salt Lake City, Utah, on Tuesday, September 13, and....m. and will be held at the Little America Hotel; 500 South Main Street; Salt Lake City, Utah...

  4. Water quality of Fremont Lake and New Fork Lakes, western Wyoming; a progress report

    USGS Publications Warehouse

    Peterson, D.A.; Averett, R.C.; Mora, K.L.

    1987-01-01

    Fremont Lake and New Fork Lakes in the New Fork River drainage of western Wyoming were selected for a comprehensive study of hydrologic processes affecting mountain lakes in the Rocky Mountains. Information is needed about lakes in this area to assess their response to existing and planned development. The concerns include regional issues such as acid precipitation from gas-sweetening plants, coal-fired powerplants, and smelters, as well as local issues, such as shoreline development and raising outlet control structures. Onsite measurements indicated strong thermal stratification in the lakes during the summer. Isothermal conditions occurred during December 1983 and May 1984. Mean phytoplankton concentrations were less than 5,000 cells/ml, and chlorophyll a concentrations were weakly correlated with phytoplankton concentrations. Zooplankton concentrations were small, less than 6 organisms/L. The numbers of benthic invertebrates/unit area in Fremont Lake were extremely small. The lake waters and inflow and outflow streams were chemically dilute solutions. Mean dissolved-solids concentrations were 13 mg/L in Fremont Lake and 24 mg/L in New Fork Lakes. Calcium and bicarbonate were the predominant ions. Concentrations of phosphorus and nitrogen usually were less than detection limits. Trace-metals concentrations in the lakes were similar to those in precipitation and generally were small. Dissolved organic-carbon concentrations were about 1 mg/L. Concentrations of fulvic and humic acids were relatively large in the inlet of Fremont Lake during the spring. Pine Creek has deposited 800 metric tons of sediment, on an annual average, to the delta of Fremont Lake. Most sediment is deposited during spring runoff. (USGS)

  5. Water quality of Fremont Lake and New Fork Lakes, western Wyoming: A progress report

    SciTech Connect

    Peterson, D.A.; Averett, R.C.; Mora, K.L.

    1987-01-01

    Fremont Lake and New Fork Lakes in the New Fork River drainage of western Wyoming were selected for a comprehensive study of hydrologic processes affecting mountain lakes in the Rocky Mountains. Information is needed about lakes in this area to assess their response to existing and planned development. The concerns include regional issues such as acid precipitation from gas-sweetening plants, coal-fired power plants, and smelters, as well as local issues, such as shoreline development and raising outlet control structures. Onsite measurements indicated strong thermal stratification in the lakes during the summer. Isothermal conditions occurred during December 1983 and May 1984. Mean phytoplankton concentrations were less than 5,000 cells/ml, and chlorophyll a concentrations were weakly correlated with phytoplankton concentrations. Zooplankton concentrations were small, less than 6 organisms/L. The numbers of benthic invertebrates/unit area in Fremont Lake were extremely small. The lake waters and inflow and outflow streams were chemically dilute solutions. Mean dissolved-solids concentrations were 13 mg/L in Fremont Lake and 24 mg/L in New Fork Lakes. Calcium and bicarbonate were the predominant ions. Concentrations of phosphorus and nitrogen usually were less than detection limits. Trace-metals concentrations in the lakes were similar to those in precipitation and generally were small. Dissolved organic-carbon concentrations were about 1 mg/L. Concentrations of fulvic and humic acids were relatively large in the inlet of Fremont Lake during the spring. Pine Creek has deposited 800 metric tons of sediment, on an annual average, to the delta of Fremont Lake. Most sediment is deposited during spring runoff. 32 refs., 33 figs., 9 tabs.

  6. OTEC support services. Quarterly technical progress report No. 18, 15 August 1982-14 November 1982

    SciTech Connect

    Not Available

    1982-11-01

    After a brief description of the technical engineering and management support services for the OTEC Program and of the task objectives, technical progress is reported in the areas of: survey, analysis, and evaluation; program technical monitoring; and transmission subsystem subsytem considerations. (LEW)

  7. OTEC support services quarterly technical progress report No. 14, 15 August 1981-14 November 1981

    SciTech Connect

    1981-11-01

    The progress in the areas of system integration, system engineering, and management services is reported. The effort is divided into seven tasks: survey, analysis, and evaluation of technical program status; program technical monitoring; development and implementation of methodology for identification, evaluation, and trade-off for major subsystem configurations; technical assessments; OTEC system integration; environment and siting considerations; and transmission subsystem considerations. (LEW)

  8. Polycrystalline Thin-Film Photovoltaic Technologies: Progress and Technical Issues

    SciTech Connect

    Ullal, H. S.

    2004-08-01

    Polycrystalline thin-film materials based on copper indium diselenide (CuInSe2, CIS) and cadmium telluride (CdTe) are promising thin-film solar cells for various power and specialty applications. Impressive results have been obtained in the past few years for both thin-film copper indium gallium diselenide (CIGS) solar cells and thin-film CdTe solar cells. NCPV/NREL scientists have achieved world-record, total-area efficiencies of 19.3% for a thin-film CIGS solar cell and 16.5% for thin-film CdTe solar cell. A number of technical R&D issues related to CIS and CdTe have been identified. Thin-film power module efficiencies up to 13.4% has been achieved thus far. Tremendous progress has been made in the technology development for module fabrication, and multi-megawatt manufacturing facilities are coming on line with expansion plans in the next few years. Several 40-480 kW polycrystalline thin-film, grid-connected PV arrays have been deployed worldwide. Hot and humid testing is also under way to validate the long-term reliability of these emerging thin-film power products. The U.S. thin-film production (amorphous silicon[a-Si], CIS, CdTe) is expected to exceed 50 MW by the end of 2005.

  9. FY 1992 work plan and technical progress reports

    SciTech Connect

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  10. Inventors Center of Michigan Technical Assessment Program. Final progress report

    SciTech Connect

    Not Available

    1992-12-31

    The Technical Assessment Program at the Inventors Center of Michigan is designed to provide independent inventors with a reliable assessment of the technical merits of their proposed inventions. Using faculty from within Ferris State University`s College of Technology an assessment process examines the inventor`s assumptions, documentation, and prototypes, as well as, reviewing patent search results and technical literature to provide the inventor with a written report on the technical aspects of the proposed invention. The forms for applying for a technical assessment of an invention are included.

  11. Plans and progress for building a Great Lakes fauna DNA ...

    EPA Pesticide Factsheets

    DNA reference libraries provide researchers with an important tool for assessing regional biodiversity by allowing unknown genetic sequences to be assigned identities, while also providing a means for taxonomists to validate identifications. Expanding the representation of Great Lakes species in such reference libraries is an explicit component of research at EPA’s Mid-Continent Ecology Division. Our DNA reference library building efforts began in 2012 with the goal of providing barcodes for at least 5 specimens of each native and nonindigenous fish and aquatic invertebrate species currently present in the Great Lakes. The approach is to pull taxonomically validated specimen for sequencing from EPA led sampling efforts of adult/juvenile fish, larval fish, benthic macroinvertebrates, and zooplankton; while also soliciting aid from state and federal agencies for tissue from “shopping list” organisms. The barcodes we generate are made available through the publicly accessible BOLD (Barcode of Life) database, and help inform a planned Great Lakes biodiversity inventory. To date, our submissions to BOLD are limited to fishes; of the 88 fish species listed as being present within Lake Superior, roughly half were successfully barcoded, while only 22 species met the desired quota of 5 barcoded specimens per species. As we continue to generate genomic information from our collections and the taxonomic representations become more complete, we will continue to

  12. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    SciTech Connect

    Hansen, Barry; Evarts, Les

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring

  13. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    SciTech Connect

    Hansen, Barry; Evarts, Les

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring

  14. Effects of Great Lakes fish consumption on brain PCB pattern, concentration, and progressive-ratio performance

    SciTech Connect

    Stewart, P.; Pagano, J.; Sargent, D.; Darvill, T.; Lonky, E.; Reihman, J.

    2000-01-01

    This study investigated the effects of consumption of Great Lakes fish on progressive ratio performance, and on the pattern and concentrations of brain polychlorinated biphenyls (PCBs), dichlorodiphenyldichloroethene (DDE), and mirex in the rat. Adult, male Sprague-Dawley rats were fed a 30% diet of either Lake Ontario salmon (LAKE), Pacific Ocean salmon, or lab chow control for 20 or 65 days. Following the treatment regimen, half the rats from each group were sacrificed immediately for gas chromatographic analysis of organochlorine contaminants, and the other half were tested on a multiple fixed-ratio-progressive-ratio reinforcement schedule and then sacrificed for analysis. Consumption of Lake Ontario fish resulted in significantly higher levels of brain PCBs, DDE, and mirex relative to controls, but still well within human exposure ranges. Consumption of Lake Ontario fish for 20 or 65 days produced an average brain PCB concentration of 457 and 934 ng/g fat, respectively. Consumption of laboratory rat chow or Pacific Ocean salmon for 20 or 65 days produced an average brain PCB concentration of 240, 464, and 441 ng/g fat, respectively. Moreover, both LAKE-fed groups showed a much more heavily chlorinated pattern of brain PCBs than all control groups, as evidenced by both significant increases in the most heavily chlorinated PCB congeners and significant increases in the average chlorine biphenyl.

  15. Technical Progress and Industrial Development in a Developing Economy.

    DTIC Science & Technology

    The production process for the system is described by a neoclassical production function with factor-augmenting technical change. This study is directed to the study of economic development in a low income country.

  16. Examining the Technical Adequacy of Reading Comprehension Measures in a Progress Monitoring Assessment System. Technical Report # 41

    ERIC Educational Resources Information Center

    Alonzo, Julie; Liu, Kimy; Tindal, Gerald

    2007-01-01

    In this technical report, the authors describe the development and piloting of reading comprehension measures as part of a comprehensive progress monitoring literacy assessment system developed in 2006 for use with students in Kindergarten through fifth grade. They begin with a brief overview of the two conceptual frameworks underlying the…

  17. Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 3

    SciTech Connect

    Ulm, Franz-Josef

    2000-03-31

    OAK-B135 Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 3(NOTE: Part II A item 1 indicates ''PAPER'', but a report is attached electronically)

  18. HAMS (Hypoxia, Monitoring, and Mitigation System) II Quarterly Progress Report (Technical and Financial)

    DTIC Science & Technology

    2015-04-10

    percent VO2max and heart rate). VO2max represents the functional limit of their respiratory and circulatory systems to deliver O2 to active muscles...Report (Technical and Financial) Quarterly Progress Report Technical and Financial Hypoxia, Monitoring, and Mitigation System Contract...Transmitter: options ......................................................................... 10 Figure 5: HAMS II System Block diagram

  19. OTEC support services. Quarterly technical progress report No. 21, 15 May-15 August 1983

    SciTech Connect

    Not Available

    1983-09-01

    Progress is reported on the system integration, system engineering, and management services for the OTEC program under the following tasks: (1) survey, analysis, and evaluation; (2) program technical monitoring; (3) development and implementation of methodology; (4) technical assessments; (5) OTEC systems integration; (6) environment and siting considerations; and (7) transmission subsystem considerations.

  20. Regional distribution of PCBs and presence of technical PCB mixtures in sediments from Norwegian and Russian Arctic Lakes.

    PubMed

    Skotvold, Trond; Savinov, Vladimir

    2003-05-01

    The results of measurement of polychlorinated biphenyls (10 PCB congeners recommended by AMAP) in surface bottom sediments collected from 26 remote lakes in Northern Norway and 11 lakes in North Russia in 1994 and 1995 are presented. Cores were collected from the deepest part of each lake with a gravity corer. The north Russian lakes were shallow ponds less than 1 m deep, while the north Norwegian lakes and the lakes on the Svalbard Archipelago were usually 10-30 m deep. The sediment samples were analyzed by GC-high resolution MS analyses. The range of concentrations was wide. In sediment from the tundra ponds, summation operator PCB were generally low, ranging from 0.2 to 1.4 ng/g dry weight (dw), with one exception (19.3 ng/g dw). In sediments from the north Norwegian lakes and the lakes on Svalbard Archipelago, the concentration was ranging from 0.7 to 35.4 ng/g dw. The geographical distribution and possibility of geographic gradients of the summation operator PCB is discussed. The PCB composition is further analyzed by statistical methods to indicate possible presence and contribution of 10 various technical PCB mixtures (Chlorphens, Kanechlors, Arochlors, Sovols) in the samples.

  1. Verification of Steelmaking Slags Iron Content Final Technical Progress Report

    SciTech Connect

    J.Y. Hwang

    2006-10-04

    The steel industry in the United States generates about 30 million tons of by-products each year, including 6 million tons of desulfurization and BOF/BOP slag. The recycling of BF (blast furnace) slag has made significant progress in past years with much of the material being utilized as construction aggregate and in cementitious applications. However, the recycling of desulfurization and BOF/BOP slags still faces many technical, economic, and environmental challenges. Previous efforts have focused on in-plant recycling of the by-products, achieving only limited success. As a result, large amounts of by-products of various qualities have been stockpiled at steel mills or disposed into landfills. After more than 50 years of stockpiling and landfilling, available mill site space has diminished and environmental constraints have increased. The prospect of conventionally landfilling of the material is a high cost option, a waste of true national resources, and an eternal material liability issue. The research effort has demonstrated that major inroads have been made in establishing the viability of recycling and reuse of the steelmaking slags. The research identified key components in the slags, developed technologies to separate the iron units and produce marketable products from the separation processes. Three products are generated from the technology developed in this research, including a high grade iron product containing about 90%Fe, a medium grade iron product containing about 60% Fe, and a low grade iron product containing less than 10% Fe. The high grade iron product contains primarily metallic iron and can be marketed as a replacement of pig iron or DRI (Direct Reduced Iron) for steel mills. The medium grade iron product contains both iron oxide and metallic iron and can be utilized as a substitute for the iron ore in the blast furnace. The low grade iron product is rich in calcium, magnesium and iron oxides and silicates. It has a sufficient lime value and

  2. First Progress Report of the Vocational-Technical Education Consortium of States.

    ERIC Educational Resources Information Center

    Hirst, Ben A., Jr.; Netrick, LeRoy M.

    This first progress report of the Vocational-Technical Education Consortium of States (V-TECS) covers the progress of the V-TECS through its first seven months of operation and is designed to provide information to member States, prospective members, and interested agencies, organizations, and foundations. (The fundamental purpose of V-TECS is to…

  3. LANL technical progress update for US HJPRR working group

    SciTech Connect

    Dombrowski, David E

    2011-01-06

    The outline of this presentation is: (1) Collaboration on Master Alloy Melting; (2) Data for Safety Analysis, (3) HIP can development status, (4) Bond strength quality, (5) Plasma spraying results, and (6) Bare Rolling Larger Rolling Ingots. Significant near term progress has been made in five areas: (1) Collaboration on Master Alloy Melting; (2) HIP can development status; (3) Bond strength quality; (4) Plasma spraying results; and (5) Bare Rolling Larger Rolling Ingots. Significant progress is expected in the next month on several important areas: (1) Intrinsic bond strength of plasma sprayed Zr (2) Advanced Cleaning; (3) Residual Stress Collaboration with INL; and (4) Cost Metric Assessment.

  4. Extra focal convective suppressing solar collector. Final technical progress report

    SciTech Connect

    1996-05-01

    This progress report describes work done on the Extra Focal Convective Suppressing Solar Collector. The topics of the report include sensor refinement for the tracking electronics, tracking controller refinement, system optics evaluation, absorber system material evaluation and performance, tracking hardware evaluation and refinement, and full scale prototype construction and testing.

  5. Assessment Program Technical Progress Report, 1997-1998.

    ERIC Educational Resources Information Center

    Eickmeyer, Barbara; Hill, Stephen

    This Assessment Program Progress Report (APPR) records the institutional activities that have taken place at Coconino Community College (CCC) during the 1997-98 academic year. It presents models, timelines, accomplishments, and opportunities for improvement in the assessment practices at CCC. Implementation and outcomes information is included for…

  6. Geothermal research at the Puna facility. Technical progress report

    SciTech Connect

    Chen, B.

    1985-12-12

    Research progress is reported. A conceptual model of the reservoir was developed comprising two production zones of different characteristics: the upper zone producing liquid while the lower zone produces vapor. Preliminary studies were carried out at the HGP-A facility on the flocculation behavior of silica under various conditions. (ACR)

  7. Single-electron charging effects. Technical progress report

    SciTech Connect

    Ruggiero, S.T.

    1991-12-15

    The status of our project on single-electron tunneling is, again, excellent. As outlined in our original proposal, a key goal for this project has been the development of a scanning tunneling instrument for the purpose of imaging individual particles and tunneling into these particles at high magnetic fields. Further progress is discussed in this report.

  8. Progress Report for the Instructional Management System. Technical Memorandum.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A progress report describes the design and demonstration of the computer-based Instructional Management Systems (IMS) for the period March 1, 1967, through February 29, 1968. The rationale and design considerations of IMS, development of its system components, functioning of the components during the first field trial, and data collected during…

  9. Technical review of the SWELL product. Second quarterly progress report

    SciTech Connect

    Alexanian, G.

    1998-03-23

    This progress report describes design and marketing efforts made to reduce the cost of the product, and reassess its market potential in light of reduced manufacturing costs and modified design. Marketing has looked at applications in agriculture, the turf grass industry, and golf coarse applications. The new controller offers energy efficiency in control of valves and minimization of costs associated with hard wired systems.

  10. Technical progress report, 1 April-30 June 1981

    SciTech Connect

    1981-01-01

    This report describes the technical accomplishments during the quarter ending June 1981, on the commercial nuclear waste management programs under the direction of the Office of Nuclear Waste Isolation (ONWI). The ONWI program is organized into 8 tasks entitled: systems, waste package, site, repository, regulatory and institutional, test facilities and excavations, land acquisition, and program management. Principal investigators in each of these areas have submitted summaries of quarterly highlights for inclusion in this report. Separate abstracts have been prepared for 5 of these tasks for inclusion in the Energy Data Base. (DMC)

  11. Quarterly technical progress report, February 1, 1996--April 30, 1996

    SciTech Connect

    1996-05-28

    This report from the Amarillo National REsource Center for PLutonium provides research highlights and provides information regarding the public dissemination of information. The center is a a scientific resource for information regarding the issues of the storage, disposition, potential utilization and transport of plutonium, high explosives, and other hazardous materials generated from nuclear weapons dismantlement. The center responds to informational needs and interpretation of technical and scientific data raised by interested parties and advisory groups. Also, research efforts are carried out on remedial action programs and biological/agricultural studies.

  12. Environmental Research Division technical progress report: January 1986--October 1987

    SciTech Connect

    Not Available

    1988-07-01

    Technical process in the various research activities of Argonne National Laboratory's Environmental Research Division is reported for the period 1986-1987. Textual, graphic, and tabular information is used to briefly summarize (in separate chapters) the work of the Division's Atmospheric Physics, Environmental Effects Research, Fundamental Molecular Physics and Chemistry, and Organic Geochemistry and Environmental Instrumentation Programs. Information on professional qualifications, awards, and outstanding professional activities of staff members, as well as lists of publications, oral presentations, special events organized, and participants in educational programs, are provided in appendices at the end of each chapter. Individual projects under each division are processed separately for the data bases.

  13. Kootenay Lake Fertilization Experiment; Years 11 and 12, Technical Report 2002-2003.

    SciTech Connect

    Schindler, E.

    2007-02-01

    pattern for an oligo-mesotrophic lake of decreasing in May, June, and early July, concurrent with the spring phytoplankton bloom, and clearing again as the summer progressed. Total phosphorus (TP) ranged from 2-11 {micro}g/L in 2002 and 2-21 {micro}g/L in 2003. With average TP values generally in the range of 3-10 {micro}g/L, Kootenay Lake is considered to be an oligotrophic to oligo-mesotrophic lake. Total dissolved phosphorus (TDP) followed the same seasonal trends as TP in 2002 and 2003 and ranged from 2-7 {micro}g/L in 2002 and from 2-10 {micro}g/L in 2003. Total nitrogen (TN) ranged from 90-380 {micro}g/L in 2002 and 100-210 {micro}g/L in 2003. During both the 2002 and 2003 sampling seasons, TN showed an overall decline in concentration with mid-summer and fall increases at some stations, which is consistent with previous years results. Dissolved inorganic nitrogen (DIN) concentrations showed a more pronounced declining trend over the sampling season compared with TN, corresponding to nitrate (the dominant component of DIN) being used by phytoplankton during summer stratification. DIN ranged from 7-176 {micro}g/L in 2002 and from 8-147 {micro}g/L in 2003. During 2003, discrete depth sampling occurred, and a more detailed look at the nitrate concentrations in the epilimnion was undertaken. There was a seasonal decline in nitrate concentrations, which supports the principle of increasing the nitrogen loading and the nitrogen to phosphorus (N:P) ratio during the fertilizer application period. Chlorophyll a (Chl a) concentrations in Kootenay Lake were in the range of 1.4-5.1 {micro}g/L in 2002 and 0.5-4.9 {micro}g/L in 2003. Over the sampling season, Chl a at North Arm stations generally increased in spring corresponding with the phytoplankton bloom, decreased during the summer, and increased again in the fall with mixing of the water column. The trend was similar, but less pronounced, at South Arm stations in these years, and spring Chl a concentrations were lower

  14. Variable progress toward ecological speciation in parapatry: stickleback across eight lake-stream transitions.

    PubMed

    Berner, Daniel; Grandchamp, Anne-Catherine; Hendry, Andrew P

    2009-07-01

    Divergent selection between contrasting habitats can sometimes drive adaptive divergence and the evolution of reproductive isolation in the face of initially high gene flow. "Progress" along this ecological speciation pathway can range from minimal divergence to full speciation. We examine this variation for threespine stickleback fish that evolved independently across eight lake-stream habitat transitions. By quantifying stickleback diets, we show that lake-stream transitions usually coincide with limnetic-benthic ecotones. By measuring genetically based phenotypes, we show that these ecotones often generate adaptive divergence in foraging morphology. By analyzing neutral genetic markers (microsatellites), we show that adaptive divergence is often associated with the presence of two populations maintaining at least partial reproductive isolation in parapatry. Coalescent-based simulations further suggest that these populations have diverged with gene flow within a few thousand generations, although we cannot rule out the possibility of phases of allopatric divergence. Finally, we find striking variation among the eight lake-stream transitions in progress toward ecological speciation. This variation allows us to hypothesize that progress is generally promoted by strong divergent selection and limited dispersal across the habitat transitions. Our study thus makes a case for ecological speciation in a parapatric context, while also highlighting variation in the outcome.

  15. C-Mod Collaboration Informal Technical Progress Report

    SciTech Connect

    Kenneth W. Gentle

    2007-12-31

    The aims of the collaboration have not changed. A specific list of tasks was agreed upon during the Fall of 2006 in preparation for the 2007 C-Mod campaign by Earl Marmar, Head of the Alcator Project, Kenneth Gentle, Principal Investigator, and William Rowan, Collaboration Coordinator with the facilitation of Adam Rosenberg (DOE grant monitor for the collaboration). The activities follow the list of tasks and are discussed in this progress report.

  16. Monthly technical progress report, January 1, 1996 - January 28, 1996

    SciTech Connect

    1996-02-24

    This is the January 1996 progress report contract DE-AC03-91SF18852 Radioisotope Thermoelectric Generators and Ancillary Activities, Cassini RTG Program. Included are discussions on the status of: (1) spacecraft integration and support, (2) engineering support, (3) safety, (4) qualified unicouple production, (5) ETG fabrication, Assembly, and Test, (6) ground support equipment, (7) RTG shipping and launch support, (8) designs, reviews, and mission applications, (9) project management, and (10) CAGO acquisition.

  17. The VLA Sky Survey (VLASS): Technical Implementation Plans and Progress

    NASA Astrophysics Data System (ADS)

    Myers, Steven T.; Law, Casey J.; Baum, Stefi Alison; Chandler, Claire J.; Chatterjee, Shami; Lacy, Mark; Murphy, Eric J.; VLASS Survey Science Group

    2016-01-01

    The VLA Sky Survey (VLASS) was initiated to exploit the science and technical opportunities for a new large radio astronomical survey using the Karl G. Jansky Very Large Array. In March 2015, the proposal for the VLASS underwent a formal Community Review. What emerged from this review is a 5400 hour project to survey the 33885 square degrees of the sky above Declination -40 degrees from 2-4 GHz at 2MHz frequency resolution and 2.5" angular resolution. Over the survey duration of 7 years, each area of the sky will be covered in 3 epochs spaced 32 months apart, to a depth of 0.12mJy/beam rms noise per epoch (0.07mJy/beam combined) in total intensity (Stokes I) and including full polarization. Observations are planned to commence in mid-2016. The raw data will be available in the NRAO archive immediately with no proprietary period and science data products will be provided to the community in a timely manner.In this presentation we describe the survey design and the Technical Implementation Plan (TIP) for the VLASS. The VLASS Basic Data Products (BDP) that will be produced by the survey team include: raw and calibrated visibility data, quick-look continuum images, single-epoch images and spectral image cubes, single-epoch basic object catalogs, and cumulative "static sky" images and image cubes and basic object catalogs to the full survey depth. Calibration, image processing, and analysis for the VLASS will be carried out through automated pipelines being developed at NRAO. Integral to this workflow is maintaining Quality Assurance throughout the system from telescope to archive. The storage and archive services budgeted for the BDP is 1PB for the data and images combined. Significantly higher storage would be required to serve the highest spectral resolution spectral cubes over the full sky area, and thus devising an affordable strategy for providing these services is critical, for example through "Processing on Demand" based on user query of the archive. We will

  18. University Research Programs in Robotics annual technical progress report, June 1, 1994--May 31, 1995

    SciTech Connect

    1995-06-01

    The University of Florida supported three technical areas within the US Department of Energy`s Robotics Technology Development Program (RTDP) during this project period: Tank Waste Retrieval (TWR) Analysis Automation (CAA), and Cross-Cutting and Advanced Technology (CC&AT). This reports the technical progress made on the tasks for each of these areas. Detailed reports will be sent to the RTDP coordinator and the project area coordinators at the end of the project period.

  19. Advanced thermally stable jet fuels. Technical progress report, 1995

    SciTech Connect

    Schobert, H.H.; Eser, S.; Song, C.

    1996-04-01

    The Penn State program in advanced thermally stable jet fuels has five components:(1) development of mechanisms of degradation and solids formation; (2) quantitative measurement of growth of sub- micrometer and micrometer sized particles suspended in fuels during thermal stressing; (3) characterization of carbonaceous deposits by various instrumental and microscopic methods; (4) elucidation of the role of additives in retarding the formation of carbonaceous solids; and (5) assessment of the potential of producing high yields of cycloalkanes and hydroaromatics by direct liquefaction of coal. Progress reports for these tasks are presented.

  20. Technical Status and Progress of Lead Recycling of Battery

    NASA Astrophysics Data System (ADS)

    Li, Wei-feng; Jiang, Li-hua; Zhan, Jing; Zhang, Chuan-fu

    The characteristics of various components in waste lead acid battery are analyzed in this paper. The present status and the study progress situation in industry production and research field of recycling of waste lead acid battery and lead paste used broken-separation technology are introduced. The comparison of advantages and disadvantages in different industry processes is carried. The advantages of redox bath smelting of lead concentrate and lead paste are analyzed. The method of redox bath smelting will be a low-carbon, environmentally friendly and efficient processes of secondary lead production and can be intensive to desulfurize for high temperature pool.

  1. Quarterly technical progress report, April-June 1982

    SciTech Connect

    1984-04-01

    Progress reports are presented for the following tasks: (1) preparation of low-rank coals; application of liquefaction processes to low-rank coals; (2) slagging fixed-bed gasification; (3) atmospheric fluidized-bed combustion of low-rank coal; (4) ash fouling and combustion modification for low-rank coal; (5) combined flue gas cleanup/simultaneous SO/sub x/-NO/sub x/ control; (6) particulate control and hydrocarbons and trace element emissions from low-rank coals; (7) waste characterization and disposal; and (9) exploratory research.

  2. Texas Experimental Tokamak. Technical progress report, April 1990--April 1993

    SciTech Connect

    Wootton, A.J.

    1993-04-01

    This progress report covers the period from November 1, 1990 to April 30, 1993. During that period, TEXT was operated as a circular tokamak with a material limiter. It was devoted to the study of basic plasma physics, in particular to study of fluctuations, turbulence, and transport. The purpose is to operate and maintain TEXT Upgrade as a complete facility for applied tokamak physics, specifically to conduct a research program under the following main headings: (1) to elucidate the mechanisms of working gas, impurity, and thermal transport in tokamaks, in particular to understand the role of turbulence; (2) to study physics of the edge plasma, in particular the turbulence; (3) to study the physics or resonant magnetic fields (ergodic magnetic divertors, intra island pumping); and (4) to study the physics of electron cyclotron heating (ECRH). Results of studies in each of these areas are reported.

  3. Power Alcohol Plant, Pfister Bros. Farms. Technical progress report

    SciTech Connect

    Gilbert, Frederick C.

    1981-01-01

    Progress is reported in the process engineering and construction of an alcohol plant. Substrate supply, waste carbohydrate material, has been reduced by 20%. Process heat will be supplied by a stoker boiler fired by natural gas in the initial stages, later by a mixture of corn cobs and coal. The design of the cooker is included. The selection of fermentation tanks has not been made. Studies in the selection of yeast for the project are underway. Distillation equipment is described. An appropriate technology for water removal has not been determined. Tests to determine the thermal efficiency of CaO as a water entraining agent are being conducted. The plant layout and construction schedule diagrams are included. (DMC)

  4. ERIP invention 637. Technical progress report 2nd quarter, April 1997--June 1997

    SciTech Connect

    Thacker, G.W.

    1997-07-22

    This technical report describes progress in the development of the Pegasus plow, a stalk and root embedding apparatus. Prototype testing is reported, and includes the addition of precision tillage. Disease data, organic matter, and nitrogen levels results are very briefly described. Progress in marketing is also reported. Current marketing issues include test use by cotton and wheat growers, establishment of dealer relationships, incorporation of design modifications, expansion of marketing activities, and expansion of loan and lease program.

  5. Texas Experimental Tokamak, a plasma research facility: Technical progress report

    SciTech Connect

    Wootton, A.J.

    1995-08-01

    In the year just past, the authors made major progress in understanding turbulence and transport in both core and edge. Development of the capability for turbulence measurements throughout the poloidal cross section and intelligent consideration of the observed asymmetries, played a critical role in this work. In their confinement studies, a limited plasma with strong, H-mode-like characteristics serendipitously appeared and received extensive study though a diverted H-mode remains elusive. In the plasma edge, they appear to be close to isolating a turbulence drive mechanism. These are major advances of benefit to the community at large, and they followed from incremental improvements in diagnostics, in the interpretation of the diagnostics, and in TEXT itself. Their general philosophy is that the understanding of plasma physics must be part of any intelligent fusion program, and that basic experimental research is the most important part of any such program. The work here demonstrates a continuing dedication to the problems of plasma transport which continue to plague the community and are an impediment to the design of future devices. They expect to show here that they approach this problem consistently, systematically, and effectively.

  6. Appalachian Clean Coal Technology Consortium. Quarterly technical progress report, 1996

    SciTech Connect

    Yoon, R.-H.; Phillips, D.I.; Luttrell, G.H.; Basim, B.; Sohn, S.; Jiang, X.; Tao, D.; Parekh, B.K.; Meloy, T.

    1996-10-01

    The Appalachian Clean Coal Technology Consortium (ACCTC) has been established to help U.S. Coal producers, particularly those in the Appalachian region, increase the production of lower-sulfur coal. The cooperative research conducted as part of the consortium activities will help utilities meet the emissions standards established by the 1990 Clean Air Act Amendments, enhance the competitiveness of U.S. coals in the world market, create jobs in economically-depressed coal producing regions, and reduce U.S. dependence on foreign energy supplies. The consortium has three charter members, including Virginia Polytechnic Institute and State University, West Virginia University, and the University of Kentucky. The Consortium also includes industry affiliate members that form an Advisory Committee. In keeping with the recommendations of the Advisory Committee, first-year R&D activities were focused on two areas of research: fine coal dewatering and modeling of spirals. The industry representatives to the Consortium identified fine coal dewatering as the most needed area of technology development. Dewatering studies were conducted by Virginia Tech`s Center for Coal and Minerals Processing and a spiral model was developed by West Virginia University. For the University of Kentucky the advisory board approved a project entitled: ``A Study of Novel Approaches for Destabilization of Flotation Froth``. Project management and administration will be provided by Virginia Tech., for the first year. Progress reports for coal dewatering and destabilization of flotation froth studies are presented in this report.

  7. Advanced thermal barrier coating system development. Technical progress report

    SciTech Connect

    1996-06-10

    The objectives of the program are to provide an improved TBC system with increased temperature capability and improved reliability relative to current state of the art TBC systems. The development of such a coating system is essential to the ATS engine meeting its objectives. The base program consists of three phases: Phase 1: Program Planning--Complete; Phase 2: Development; Phase 3: Selected Specimen--Bench Test. Work is currently being performed in Phase 2 of the program. In Phase 2, process improvements will be married with new bond coat and ceramic materials systems to provide improvements over currently available TBC systems. Coating reliability will be further improved with the development of an improved lifing model and NDE techniques. This will be accomplished by conducting the following program tasks: II.1 Process Modeling; II.2 Bond Coat Development; II.3 Analytical Lifing Model; II.4 Process Development; II.5 NDE, Maintenance and Repair; II.6 New TBC Concepts. A brief summary is given of progress made in each of these 6 areas.

  8. Transport and relaxation processes in supercritical fluids. Technical progress report

    SciTech Connect

    Jonas, J.

    1986-01-01

    We have tested our improved NMR method for determining diffusion coefficients using a sample of H/sub 2/O. We obtain the literature value for D to within the error of the experiment (+- 3%). A manuscript on the method is in preparation. This NMR diffusion experiment now allows us to obtain diffusion data for the naphthalene-CO/sub 2/ system. Spin echo modulation is no longer a problem, so we may monitor the proton NMR signal from naphthalene which has the necessary sensitivity to obtain diffusion data. Diffusion measurements are now in progress. These are the first NMR diffusion measurements on a solid-supercritical fluid system. We have recently been testing the feasibility of obtaining high resolution sulfur-33 NMR spectra of solids containing sulfur dissolved in supercritical fluids. Typically sulfur linewidths in these molecules are very large (greater than 10kHz) when dissolved in liquid solution. However, the viscosity of a supercritical fluid is much less than that of a simple liquid, and thus a sulfur containing compound dissolved in a supercritical fluid should have a greatly narrowed linewidth. This would allow the characterization of sulfur containing coal liquids, for example. We have investigated the system dibenzothiophene-supercritical ethylene in this way. Unfortunately, the NMR sensitivity of /sup 33/S is quite poor, and the signal to noise ratios were not sufficient to obtain the spectrum. We now plan to use the supercritical solvent xenon, which is known to be an excellent solvent. This solvent should give greater solubilities so that the problems of sensitivity can be overcome.

  9. Technical Adequacy of Growth Estimates from a Computer Adaptive Test: Implications for Progress Monitoring

    ERIC Educational Resources Information Center

    Van Norman, Ethan R.; Nelson, Peter M.; Parker, David C.

    2017-01-01

    Computer adaptive tests (CATs) hold promise to monitor student progress within multitiered systems of support. However, the relationship between how long and how often data are collected and the technical adequacy of growth estimates from CATs has not been explored. Given CAT administration times, it is important to identify optimal data…

  10. Responsive copolymers for enhanced petroleum recovery. Quarterly technical progress report, September 22, 1992--December 22, 1992

    SciTech Connect

    McCormick, C.; Hester, R.

    1992-12-31

    The overall goal of this research is the development of advanced water-soluble copolymers for use in enhanced oil recovery which rely on reversible microheterogeneous associations for mobility control and reservoir conformance. Technical progress is summarized for the following tasks: advanced copolymer synthesis; characterization of macromolecular structure and properties; and solution rheology in a porous media.

  11. Responsive copolymers for enhanced petroleum recovery. Quarterly technical progress report, March 22, 1993--June 22, 1993

    SciTech Connect

    McCormick, C.; Hester, R.

    1993-08-01

    The overall goal of this research is the development of advanced water-soluble copolymers for use in enhanced oil recovery which rely on reversible microheterogeneous associations for mobility control and reservoir conformance. Technical progress for the quarter is summarized for the following tasks: advanced copolymer syntheses; characterization of molecular structure of copolymers; and polymer solution rheology.

  12. Technical Assistance Paper: Third-Grade Student Progression. DPS: 2013-56

    ERIC Educational Resources Information Center

    Florida Department of Education, 2013

    2013-01-01

    The purpose of this Technical Assistance Paper (TAP) is to provide school districts with updates and changes relative to third-grade student progression policies, including information on alternative assessments, promotion criteria and resources. This paper provides: (1) General Information; (2) Student Portfolios for Third-Grade Students; (3)…

  13. Cassini RTG Program. Monthly technical progress report, 27 November--31 December 1995

    SciTech Connect

    1996-01-24

    This monthly technical progress report provided information on the following tasks: spacecraft integration and liaison; engineering support; safety analysis; qualified unicouple fabrication; ETG fabrication, assembly, and test; ground support equipment (GSE); RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, and reliability, and contractor acquired government owned (CAGO) property acquisition.

  14. Amarillo National Resource Center for Plutonium. Quarterly technical progress report, May 1--July 31, 1998

    SciTech Connect

    1998-09-01

    Progress is reported on research projects related to the following: Electronic resource library; Environment, safety, and health; Communication, education, training, and community involvement; Nuclear and other materials; and Reporting, evaluation, monitoring, and administration. Technical studies investigate remedial action of high explosives-contaminated lands, radioactive waste management, nondestructive assay methods, and plutonium processing, handling, and storage.

  15. Responsive copolymers for enhanced petroleum recovery. Quarterly technical progress report, December 22, 1992--March 21, 1993

    SciTech Connect

    Hester, R.; McCormick, C.

    1993-06-01

    The overall objective of this research is the development of advanced water-soluble copolymers for use in enhanced oil recovery which rely on reversible microheterogeneous associations for mobility control and reservoir conformance. Technical progress is summarized for the following tasks: advanced copolymer synthesis; characterization of molecular structure; and solution rheology.

  16. Education, Industrialization and Technical Progress in Mexico. IIEP Research Report No. 6.

    ERIC Educational Resources Information Center

    Padua, Jorge

    This report attempts to analyze the contributions of the educational system and job training programs to industrialization and technical progress in the Conubal zone of the Lower Balsas River of Mexico. The first of the study's three sections consists of two chapters that provide general background. Chapter 1, "Theories of Development and the…

  17. Technical Adequacy and Acceptability of Curriculum-Based Measurement and the Measures of Academic Progress

    ERIC Educational Resources Information Center

    January, Stacy-Ann A.; Ardoin, Scott P.

    2015-01-01

    Curriculum-based measurement in reading (CBM-R) and the Measures of Academic Progress (MAP) are assessment tools widely employed for universal screening in schools. Although a large body of research supports the validity of CBM-R, limited empirical evidence exists supporting the technical adequacy of MAP or the acceptability of either measure for…

  18. Third Progress and Information Report of the Vocational-Technical Education Consortium of States.

    ERIC Educational Resources Information Center

    Lee, Connie W.; And Others

    This description of major activities and accomplishments of the Vocational-Technical Education Consortium of the States (V-TECS) since the second progress report of May, 1975, is designed to provide the reader with a basic understanding of the processes and procedures used by the consortium in achieving its major goal: The production of catalogs…

  19. The Standard Progressive Matrices: A Pilot Study in a Nigerian Technical College

    ERIC Educational Resources Information Center

    McCarthy, Maureen

    1974-01-01

    The purpose of the study reported was to introduce some basic principles of guidance and counseling into the Technical College at Ife, West Africa. Results indicate that the Standard Progressive Matrices test could help to select students suited for study centering around the building trades. (Author/PG)

  20. The Standard Progressive Matrices: A Pilot Study in a Nigerian Technical College

    ERIC Educational Resources Information Center

    McCarthy, Maureen

    1974-01-01

    The purpose of the study reported was to introduce some basic principles of guidance and counseling into the Technical College at Ife, West Africa. Results indicate that the Standard Progressive Matrices test could help to select students suited for study centering around the building trades. (Author/PG)

  1. Technical Adequacy and Acceptability of Curriculum-Based Measurement and the Measures of Academic Progress

    ERIC Educational Resources Information Center

    January, Stacy-Ann A.; Ardoin, Scott P.

    2015-01-01

    Curriculum-based measurement in reading (CBM-R) and the Measures of Academic Progress (MAP) are assessment tools widely employed for universal screening in schools. Although a large body of research supports the validity of CBM-R, limited empirical evidence exists supporting the technical adequacy of MAP or the acceptability of either measure for…

  2. Technical and economic feasibility of membrane technology. Fourth technical progress report, June 17-September 16, 1980

    SciTech Connect

    Sandre, A.

    1980-10-01

    Progress is reported on the investigation of the potential application of reverse osmosis, ultrafiltration and electrodialysis to the system of solids concentration in beet sugar process streams. During this period, emphasis was put on running reverse osmosis tests with a new prototype machine to select the most suitable membranes for the concentrating of sugar solutions. An economic analysis of using reverse osmosis in a factory producing 10/sup 6/ gal/day of thin juice is discussed. (DMC)

  3. Lake

    ERIC Educational Resources Information Center

    Wien, Carol Anne

    2008-01-01

    The lake is blue black and deep. It is a glaciated finger lake, clawed out of rock when ice retracted across Nova Scotia in a northerly direction during the last ice age. The lake is narrow, a little over a mile long, and deep, 90 to 190 feet in places according to local lore, off the charts in others. The author loves to swim there, with a sense…

  4. Development of superior asphalt recycling agency: Phase 1, Technical feasibility. Technical progress report

    SciTech Connect

    Bullin, J.A.; Glover, C.J.; Davison, R.R.; Lin, Moon-Sun; Chaffin, J.; Liu, Meng; Eckhardt, C.

    1996-04-01

    About every 12 years, asphalt roads must be reworked, and this is usually done by placing thick layers (hot-mix overlays) of new material on top of failed material, resulting in considerable waste of material and use of new asphalt binder. A good recycling agent is needed, not only to reduce the viscosity of the aged material but also to restore compatibility. Objective is to establish the technical feasibility (Phase I) of determining the specifications and operating parameters for producing high quality recycling agents which will allow most/all the old asphalt-based road material to be recycled. It is expected that supercritical fractionation can be used. The advanced road aging simulation procedure will be used to study aging of blends of old asphalt and recycling agents.

  5. Method for estimating materials fluxes from coastal wetlands into the Great Lakes, with an example from lake Erie. Technical bulletin

    SciTech Connect

    Krieger, K.A.

    1993-01-01

    A method is presented in detail for the quantitative estimation of the flux of water and dissolved or suspended materials through coastal wetlands of the Great Lakes where the juncture of the wetland and lake is constricted by a narrow opening. Application of the method requires frequent (e.g., hourly or daily) data on atmospheric deposition, precipitation, evaporation, upstream discharges from tributaries, wetland water level changes, and water chemistry data at upstream and downstream locations, as well as a detailed knowledge of wetland depth-area and depth-volume relationships. Data collected during October 1989 are used to demonstrate the method.

  6. Professional technical support services for the Mining Equipment Test Facility. First annual technical progress report, April 14-September 30, 1981

    SciTech Connect

    Garson, R C

    1981-10-01

    The Department of Energy recently began the operation of its Mining Equipment Test Facility. One component at that facility is the highly sophisticated Mine Roof Simulator (MRS) for research and development of roof support equipment. Because of its previous experience, the University of Pittsburgh was contracted to assist the Facilities Manager by providing professional technical support services, principally for the MRS. This technical progress report briefly describes the services provided during the reporting period and planned for the next period. No significant technical disclosures of interest to those not associated with the MRS are contained herein. One of the four units of the US government-owned METF is the Mine Roof Simulator. This unique $10 million test facility was designed to simulate underground mine roof loads and motions. The MRS is a hybrid, analog-digital, computer-controlled, closed-loop, electro-hydraulic, research device capable of applying either loads or displacements in the vertical and one horizontal axis. Its vertical capacity of 3,000,000 pounds can be applied over its 20 by 20 foot active test area. The horizontal load capacity is 1,600,000 pounds. It can simulate coal seam heights of up to 16 feet. Automatic data acquisition and real time display are provided. The most modern, sophisticated technology was used in its design and construction.

  7. PREFACE: Scientific and Technical Challenges in the Well Drilling Progress

    NASA Astrophysics Data System (ADS)

    2015-02-01

    departments - Technologies in Mineral Exploration and Technologies in Mineral Exploration were merged into one department. In 2003 the newly merged Department of Drilling was established within the Institute of Petroleum Engineering, now the Institute of Natural Resources and is located in Building № 6 where it began its life. During these 60 years more than 3000 specialists have graduated the Department of Drilling, many whom are highly-qualified and dedicated professionals. There is no doubt that this Conference involved comprehensive advanced engineering problems in drilling and issues on relevant personnel training. It is extremely important to understand how the 60-year progress and contribution in the field of drilling has left its trace in the history of this Department; and, that, now, it is necessary to move further and seek new and new horizons in drilling.

  8. Biomass energy technology annual technical progress report, FY 1982. Volume II. Technical summary

    SciTech Connect

    Not Available

    1982-01-01

    The goal of the BET program is to conduct an integrated R and D program for feedstock production and conversion of organic materials to economically produce energy products that will significantly contribute to meeting long-term US energy needs. In feedstock production, laboratory investigations are being performed to reduce the risks associated with the production of microalgal oils that can be used for energy applications and high-value chemical substitutes. Research also is being done on the biochemical mechanisms that control hydrocarbon production by macroalgal species. There has been significant progress in the DOE Short-Rotation Woods Crops Program aimed at increasing yields of biomass through both improved traditional/conventional silvicultural techniques and short-rotation intensive culture. Studies that evaluate the potential of milkweed as an energy feedstock were completed in FY 1982. In thermochemical conversion, evaluations of a variety of high-performance gasification systems for producing medium-Btu gas and synthesis gas were concluded in FY 1982. Free market forces are expected to stimulate private sector interest in developing the technology and marketing needed to commercialize medium-Btu gasification systems. Medium-Btu gases have numerous beneficial industrial applications, and this technology is close to entry into the marketplace. Progress has been made in FY 1982 toward understanding the basic mechanisms and kinetics affecting the thermochemical processing of biomass through fast pyrolysis and direct liquefaction techniques. In biochemical conversion, fundamental research is being performed on the anaerobic digestion process. FY 1982 research activities also included laboratory-scale experiments on photobiological methods for hydrogen production. Separate abstracts have been prepared for each of the 3 program areas for inclusion in the Energy Data Base. (DMC)

  9. Examining the Technical Adequacy of Second-Grade Reading Comprehension Measures in a Progress Monitoring Assessment System. Technical Report # 08-08

    ERIC Educational Resources Information Center

    Alonzo, Julie; Liu, Kimy; Tindal, Gerald

    2008-01-01

    This technical report describes the development of reading comprehension assessments designed for use as progress monitoring measures appropriate for 2nd Grade students. The creation, piloting, and technical adequacy of the measures are presented. The following are appended: (1) Item Specifications for MC [Multiple Choice] Comprehension - Passage…

  10. Development of superior asphalt recycling agents. Phase 1, Technical feasibility. Technical progress report

    SciTech Connect

    Bullin, J.A.; Glover, C.J.; Davison, R.R.; Chaffin, J.; Lin, Moon-Sun

    1995-07-01

    About 27 million tons of asphalt and nearly twenty times this much aggregate are consumed each year to build and maintain over two million miles of roads in this country. Over a cycle of about 12 years on the average, these roads must be reworked and much of these millions of tons of rock and asphalt cannot be reused with present recycling technology. Instead, much of the maintenance is accomplished by placing thick layers (hot-mix overlays) of new material on top of the failed material. This results in considerable waste of material, both in terms of quality aggregate and in terms of asphalt binder. In addition, the new asphalt binder represents a significant source of potential energy. The main impediment to recycling asphalt binder is the poorly developed science of recycling agent composition and, as a result, optimum recycling agents are not available. An excellent recycling agent should not only be able to reduce the viscosity of the aged material, but it must also be able to restore compatibility. The properties of the old material and recycling agent must be compatible to give both good initial properties and aging characteristics, and this must be understood. The agent must also be inexpensive and easily manufactured. A large quantity of potential feedstock for the production of recycling agents is available and much of it is now fed to cokers. This material could be recovered by supercritical extraction which is an existing refinery technology. A supercritical pilot plant is available at Texas A&M and has been used to produce fractions for study. The objective of this research is to establish the technical feasibility of determining the specifications and operating parameters necessary to produce high quality recycling agents which will allow most old asphalt-based road material to be recycled.

  11. 76 FR 79536 - Security Zones; Captain of the Port Lake Michigan; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... telephone number is incorrect as well as the frequency of VHF Channel 16. These corrections will ensure the... a radio frequency used for contacting the Captain of the Port Lake Michigan. Under 5 U.S.C. 553(d)(3... radio frequency that is used for contacting the Captain of the Port Lake Michigan. Background and...

  12. Technical background information for the environmental and safety report, Volume 4: White Oak Lake and Dam

    SciTech Connect

    Oakes, T.W.; Kelly, B.A.; Ohnesorge, W.F.; Eldridge, J.S.; Bird, J.C.; Shank, K.E.; Tsakeres, F.S.

    1982-03-01

    This report has been prepared to provide background information on White Oak Lake for the Oak Ridge National Laboratory Environmental and Safety Report. The paper presents the history of White Oak Dam and Lake and describes the hydrological conditions of the White Oak Creek watershed. Past and present sediment and water data are included; pathway analyses are described in detail.

  13. Restoring and protecting the world`s lakes and reservoirs. World Bank technical paper

    SciTech Connect

    Dinar, A.; Seidl, P.; Olem, H.; Jorden, V.; Duda, A.

    1995-10-01

    The paper calls attention to the particular problems that lakes and reservoirs have suffered as a result of increased siltation, nutrient loading, toxics, habitat degradation, over-exploitation, and changes to marginal ecosystems. It identifies vital components of the water-based ecosystem requiring special consideration to maintain biodiversity, including wetlands and marginal floodplains inextricably linked to lakes and reservoirs.

  14. Advanced Coal Conversion Process Demonstration Project. Technical progress report, January 1, 1995--March 31, 1995

    SciTech Connect

    1996-06-01

    This detailed report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project. This U.S. Department of Energy (DOE) Clean Coal Technology Project demonstrates an advanced thermal coal upgrading process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to high-quality, low-sulfur fuel. During this reporting period, the primary focus for the project was to expand market awareness and acceptability for the products and the technology. The use of covered hopper cars has been successful and marketing efforts have focused on this technique. Operational improvements are currently aimed at developing fines marketing systems, increasing throughput capacity, decreasing operation costs, and developing standardized continuous operator training. Testburns at industrial user sites were also conducted. A detailed process description; technical progress report including facility operations/plant production, facility testing, product testing, and testburn product; and process stability report are included. 3 figs., 8 tabs.

  15. Clinch River Breeder Reactor Plant Project. Summary edition. 1980 technical progress report, October 1979-September 1980

    SciTech Connect

    Not Available

    1980-01-01

    This technical progress report on the CRBRP Project describes the objectives, design decisions, and major accomplishments achieved in the planning, organizing, design, and execution of the Project during the period October 1, 1979, through September 30, 1980. It is a summary of the 1980 CRBRP Technical Progress Report, which was prepared by the Advanced Reactors Division of Westinghouse Electric Corporation, the Lead Reactor Manufacturer for the Clinch River Breeder Reactor Plant Project, in fulfillment of contract requirements with the United States Department of Energy. It includes inputs from the CRBRP Architect-Engineer (Burns and Roe, Inc.), from the Constructor (Stone and Webster Engineering Corporation), and from the supporting Reactor Manufacturers (Atomics International Division of the Energy Systems Group of Rockwell International Corporation, the Advanced Reactor Systems Department of General Electric Company, and the Advanced Reactors Division of Westinghouse Electric Corporation).

  16. Advanced coal-fueled gas turbine systems, Volume 1: Annual technical progress report

    SciTech Connect

    Not Available

    1988-07-01

    This is the first annual technical progress report for The Advanced Coal-Fueled Gas Turbine Systems Program. Two semi-annual technical progress reports were previously issued. This program was initially by the Department of Energy as an R D effort to establish the technology base for the commercial application of direct coal-fired gas turbines. The combustion system under consideration incorporates a modular three-stage slagging combustor concept. Fuel-rich conditions inhibit NO/sub x/ formation from fuel nitrogen in the first stage; coal ash and sulfur is subsequently removed from the combustion gases by an impact separator in the second stage. Final oxidation of the fuel-rich gases and dilution to achieve the desired turbine inlet conditions are accomplished in the third stage. 27 figs., 15 tabs.

  17. The magnetohydrodynamics coal-fired flow facility. Technical progress report, April 1, 1995--June 30, 1995

    SciTech Connect

    1995-07-01

    In this quarterly technical progress report, UTSI reports on the status of a multi-task contract to develop the technology for the steam bottoming portion of a MHD Steam Combined Cycle Power Plant. The report describes the facility maintenance and environmental work completed, status of completing technical reports and certain key administrative actions occurring during the quarter. With program resources at a minimum due to closeout the MHD program, no further testing occurred during the quarter, but the DOE CFFF facility was maintained in a standby status, preventive maintenance and repairs accomplished as needed. Plans and actions progressed for environmental actions needed at the site to investigate and characterize the groundwater. Data and documentation on results of the MHD program have been identified for archiving and are being maintained for archival storage.

  18. MHD Integrated Topping Cycle Project. Eighteenth quarterly technical progress report, November 1, 1991--January 31, 1992

    SciTech Connect

    Not Available

    1992-07-01

    This eighteenth quarterly technical progress report of the MHD Integrated Topping cycle Project presents the accomplishments during the period November 1, 1991 to January 31, 1992. The precombustor is fully assembled. Manufacturing of all slagging stage components has been completed. All cooling panels were welded in place and the panel/shell gap was filled with RTV. Final combustor assembly is in progress. The low pressure cooling subsystem (LPCS) was delivered to the CDIF. Second stage brazing issues were resolved. The construction of the two anode power cabinets was completed.

  19. Evaporation by mechanical vapor recompression. Technical progress report, January 1, 1980-April 1, 1980

    SciTech Connect

    Iverson, C.H.; Coury, G.E.

    1980-01-01

    Progress for the period from January 1, 1980 to April 1, 1980, in the development of a study of the application of the technologies of Mechanical Vapor Recompression and Falling Film Evaporation as applied to the beet sugar industry is reported. Progress is reported in the following areas: technical literature search; report on visit to European factories using these technologies; energy balance studies of facories offered by the industry as candidates for the demonstration plants; and report on energy balance studies and the recommendations as to the site for the demonstration plant.

  20. Technical progress in silicon sheet growth under DOE/JPL FSA program, 1975-1986

    NASA Technical Reports Server (NTRS)

    Kalejs, J. P.

    1986-01-01

    The technical progress made in the Silicon Sheet Growth Program during its 11 years was reviewed. At present, in 1986, only two of the original 9 techniques have survived to the start-up, pilot-plant stage in industry. These two techniques are the edge-defined, film-fed growth (EFG) technique that produces closed shape polygons, and the WEB dendritic technique that produces single ribbons. Both the status and future concerns of the EFG and WEB techniques were discussed.

  1. Cassini RTG Program monthly technical progress report, July 28--August 24, 1997

    SciTech Connect

    1997-09-24

    The technical progress achieved during this period is described. This report is organized by program task structure: (1) spacecraft and integration liaison; (2) engineering support; (3) safety; (4) qualified unicouple production; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair; and (10) CAGO acquisition (capital funds).

  2. Cassini RTG Program. Monthly technical progress report, October 30--November 26, 1995

    SciTech Connect

    1995-12-24

    The technical progress achieved during the period 30 October through 26 November, 1995 is described herein. This report is organized by program task structure: (1) spacecraft integration and liaison; (2) engineering support; (3) safety; (4) qualified unicouple production; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and GACO maintenance and repair; and CAGO acquisition (capital funds).

  3. Cassini RTG Program. Monthly technical progress report, October 2--October 29, 1995

    SciTech Connect

    1995-11-24

    The technical progress achieved during the period 2 October through 29 October, 1995 is described herein. This report is organized by program task structure: (1) spacecraft integration and liaison; (2) engineering support; (3) safety; (4) qualified unicouple production; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and GACO maintenance and repair; and CAGO acquisition (capital funds).

  4. Nuclear magnetic resonance studies of granular flows: Technical progress report, quarter ending 09/30/93

    SciTech Connect

    Not Available

    1993-10-27

    This Technical Progress Report for the quarter ending 09/30/93 describes work on two tasks which are part of nuclear magnetic resonance studies of granular flows. (1) Research has been directed toward improving concentration measurements under reasonably fast conditions. (2) The process continues of obtaining comprehensive velocity, concentration, and diffusion information at several angular velocities of the cylinder for seeds (mustard, sesame, and sunflower seeds) flowing in a half-filled cylinder.

  5. Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1994

    SciTech Connect

    Not Available

    1994-05-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Reports on a quarterly basis. This report comprises the first Quarterly Technical Progress Report for Year 2 of the Agreement. This report reflects the progress and/or efforts performed on the sixteen (16) technical projects encompassed by the Year 2 Agreement for the period of January 1 through March 31, 1994. In situ bioremediation of chlorinated organic solvents; Microbial enrichment for enhancing in-situ biodegradation of hazardous organic wastes; Treatment of volatile organic compounds (VOCs) using biofilters; Drain-enhanced soil flushing (DESF) for organic contaminants removal; Chemical destruction of chlorinated organic compounds; Remediation of hazardous sites with steam reforming; Soil decontamination with a packed flotation column; Use of granular activated carbon columns for the simultaneous removal of organics, heavy metals, and radionuclides; Monolayer and multilayer self-assembled polyion films for gas-phase chemical sensors; Compact mercuric iodide detector technology development; Evaluation of IR and mass spectrometric techniques for on-site monitoring of volatile organic compounds; A systematic database of the state of hazardous waste clean-up technologies; Dust control methods for insitu nuclear and hazardous waste handling; Winfield Lock and Dam remediation; and Socio-economic assessment of alternative environmental restoration technologies.

  6. Solar/hydro integration study. Technical progress report, February-July 1980. [STORMRK code

    SciTech Connect

    Not Available

    1980-01-01

    The Water and Power Resources Service in cooperation with the Department of Energy (DOE) is investigating the technical and economic feasibility of integrating solar central receiver powerplants with the Federal hydroelectric power system in the southwest United States. The principal hydro facility in this region is Hoover Dam. It is located on the Colorado River with Lake Mead on the upstream side and Lake Mohave on the downstream side. The central receiver was selected for this application because DOE has identified it as the most economically feasible design for large power systems, i.e., 100-MWe systems or larger. Typical meteorological year (TMY) data were obtained for Las Vegas from the Solar Energy Research Institute. Plots of available solar energy at Yuma and Mormon Mesa are presented for several operational threshold levels. The data show that a solar plant's operational time can be reduced by 20% and still utilize more than 97% of the available solar energy. The Mormon Mesa site has slightly more solar energy available than the Yuma site. A meteorological surface observation network (MESONET) weather station is being prepared for installation at the Yuma site. The MESONET station which normally measures temperature, relative humidity, barometric pressure, wind speed, and wind direction will be retrofitted to measure direct beam and global radiation. The radiation data will be used in dynamic simulations of solar power systems. (WHK)

  7. Kokanee Stock Status and Contribution Cabinet Gorge Hatchery, Lake Pend Oreille, Idaho, 1988 Annual Progress Report.

    SciTech Connect

    Bowles, Edward C.

    1989-02-01

    The kokanee Oncorhynchus nerka rehabilitation program for Lake Pend Oreille continued to show progress during 1988. Estimated kokanee abundance in early September was 10.2 million fish. This estimate is 70% higher than 1987 and 140% higher than the populations's low point in 1986. Increased population size over the past two years is the result of two consecutive strong year classes produced from high recruitment of hatchery and wild fry. High recruitment of wild fry in 1988 resulted from good parental escapement (strong year class) in 1987 and relatively high fry survival. Hatchery fry made up 51% of total fry recruitment (73% of total fry biomass), which is the largest contribution since hatchery supplementation began in the 1970s. High hatchery fry abundance resulted from a large release (13 million fry) from Cabinet Gorge Hatchery and excellent fry survival (29%) during their first summer in Lake Pend Oreille. Improved fry release strategies enhanced survival, which doubled from 1987 to 1988 and was ten times higher than survival in 1986. Our research goal is to maintain 30% survival so we are very optimistic, but need to replicate additional years to address annual variability. 27 refs., 24 figs., 3 tabs.

  8. Report: Results of Technical Network Vulnerability Assessment: EPA’s Great Lakes National Program Office

    EPA Pesticide Factsheets

    Report #09-P-0185, June 30, 2009. Vulnerability testing conducted in May 2009 of EPA’s Great Lakes National Program Office network identified Internet Protocol addresses with several high-risk vulnerabilities associated with one device.

  9. Technical challenges and solutions in representing lakes when using WRF in downscaling applications

    NASA Astrophysics Data System (ADS)

    Mallard, M. S.; Nolte, C. G.; Spero, T. L.; Bullock, O. R.; Alapaty, K.; Herwehe, J. A.; Gula, J.; Bowden, J. H.

    2015-04-01

    The Weather Research and Forecasting (WRF) model is commonly used to make high-resolution future projections of regional climate by downscaling global climate model (GCM) outputs. Because the GCM fields are typically at a much coarser spatial resolution than the target regional downscaled fields, lakes are often poorly resolved in the driving global fields, if they are resolved at all. In such an application, using WRF's default interpolation methods can result in unrealistic lake temperatures and ice cover at inland water points. Prior studies have shown that lake temperatures and ice cover impact the simulation of other surface variables, such as air temperatures and precipitation, two fields that are often used in regional climate applications to understand the impacts of climate change on human health and the environment. Here, alternative methods for setting lake surface variables in WRF for downscaling simulations are presented and contrasted.

  10. Advanced direct liquefaction concepts for PETC generic units. Quarterly technical progress report, April 1993--June 1993

    SciTech Connect

    Not Available

    1993-08-01

    Section 1 contains a report of the progress by the University of Kentucky Center for Applied Energy Research on the following tasks: laboratory support (liquefaction in dewaxed and hydrotreated dewaxed solvent); CO pretreatment (effect of process variables on CO pretreatment, CO-pretreated product characterization, and liquefaction results); and iron based dispersed catalysts (production, characterization and testing of sulfated hematites and reaction model development). Section 2 contains a progress report by CONSOL, Inc. on the following tasks: laboratory support; pretreatment work on dewaxing; pretreatment work on agglomeration; and economic evaluation. Progress by Sandia National Laboratories is reported in Section 3 on the following: laboratory support (TGA methods) and solvent pretreatment (coker tar hydrogenation and coal liquefaction results). Section 4 gives a preliminary technical assessment by LDP Associates on the following: baseline economic assessment; assessment of improved coal conversion; and fluid coking.

  11. Generation and focusing of pulsed intense ion beams. Technical progress report, 1 October 1982 - 30 September, 1983

    SciTech Connect

    Hammer, D.A.; Kusse, B.R.; Sudan, R.N.

    1983-07-01

    The progress on this contract is described in three parts. The first deals with the technical operation of the LION accelerator. The second and third parts are concerned with the experimental results.

  12. Technical evaluation of a total maximum daily load model for Upper Klamath and Agency Lakes, Oregon

    USGS Publications Warehouse

    Wood, Tamara M.; Wherry, Susan A.; Carter, James L.; Kuwabara, James S.; Simon, Nancy S.; Rounds, Stewart A.

    2013-01-01

    We reviewed a mass balance model developed in 2001 that guided establishment of the phosphorus total maximum daily load (TMDL) for Upper Klamath and Agency Lakes, Oregon. The purpose of the review was to evaluate the strengths and weaknesses of the model and to determine whether improvements could be made using information derived from studies since the model was first developed. The new data have contributed to the understanding of processes in the lakes, particularly internal loading of phosphorus from sediment, and include measurements of diffusive fluxes of phosphorus from the bottom sediments, groundwater advection, desorption from iron oxides at high pH in a laboratory setting, and estimates of fluxes of phosphorus bound to iron and aluminum oxides. None of these processes in isolation, however, is large enough to account for the episodically high values of whole-lake internal loading calculated from a mass balance, which can range from 10 to 20 milligrams per square meter per day for short periods. The possible role of benthic invertebrates in lake sediments in the internal loading of phosphorus in the lake has become apparent since the development of the TMDL model. Benthic invertebrates can increase diffusive fluxes several-fold through bioturbation and biodiffusion, and, if the invertebrates are bottom feeders, they can recycle phosphorus to the water column through metabolic excretion. These organisms have high densities (1,822–62,178 individuals per square meter) in Upper Klamath Lake. Conversion of the mean density of tubificid worms (Oligochaeta) and chironomid midges (Diptera), two of the dominant taxa, to an areal flux rate based on laboratory measurements of metabolic excretion of two abundant species suggested that excretion by benthic invertebrates is at least as important as any of the other identified processes for internal loading to the water column. Data from sediment cores collected around Upper Klamath Lake since the development of the

  13. Management Plan for Experimental Reintroduction of Sockeye into Skaha Lake; Proposed Implementation, Monitoring, and Evaluation, 2004 Technical Report.

    SciTech Connect

    Wright, Howie; Smith, Howard

    2004-01-01

    Okanagan River sockeye salmon, which spawn near the town of Oliver, B.C., have their farther upstream migration limited by several water control and diversion dams. Stock numbers have been declining for many years and the Okanagan Native Alliance Fisheries Department (ONAFD) has been the principal advocate of a program to restore their numbers and range by reintroducing them into upstream waters where they may once have occurred in substantial numbers Some investigators have warned that without effective intervention Okanagan sockeye are at considerable risk of extinction. Among a host of threats, the quality of water in the single nursery areas in Osoyoos Lake. is deteriorating and a sanctuary such as that afforded in larger lakes higher in the system could be essential. Because the proposed reintroduction upstream has implications for other fish species, (particularly kokanee, the so-called ''landlocked sockeye'' which reside in many Okanagan lakes), the proponents undertook a three-year investigation, with funding from the Bonneville Power Administration and the Confederated Tribes of the Colville Reservation, to identify possible problem areas, and they committed to an interim experimental reintroduction to Skaha Lake where any problems could be worked out before a more ambitious reintroduction, (e.g. to Okanagan Lake) could be formally considered. The three-year investigation was completed in the spring of 2003. It included an assessment of risks from disease or the possible introduction of unwanted exotic species. It also considered the present quality and quantity of sockeye habitat, and opportunities for expanding or improving it. Finally ecological complexity encouraged the development of a life history model to examine interactions of sockeye with other fishes and their food organisms. While some problem areas were exposed in the course of these studies, they appeared to be manageable and the concept of an experimental reintroduction was largely supported

  14. Live/Dead Comparisons of Ostracodes in Temperate Lakes Reveal Evidence of Human Impact and Provides a Tool to Measure the Progress of Remediation Efforts

    NASA Astrophysics Data System (ADS)

    Spergel, J.; Kimball, K. C.; Fitzpatrick, S. A.; Michelson, A. V.; Leonard-Pingel, J.

    2015-12-01

    the progress of remediation efforts already underway. Further work will focus on dating the upper centimeter of sediment in these lakes to provide an estimate of how long it takes for death assemblages to accumulate and thus how long it will take to regain high live/dead fidelity in impacted lakes undergoing remediation.

  15. Monthly technical progress report, 29 January 1996--25 Februray 1996

    SciTech Connect

    1996-04-01

    This report discusses the technical progress made on the radioisotope thermoelectric generators and ancillary activities for the Cassini space probe mission to the planet Saturn. The probe is designated for launch in October of 1997. This report covers the project reporting period from 29 January 1996 through 25 February 1996. The report is organized by program task structure and includes activities for: spacecraft integration and liason; engineering support; safety; qualified unicouple production; ETG fabrication, assembly, and testing; RTG shipping and launch support; designs, reviews and mission applications; quality assurance, reliability and contract changes; and CAGO acquisition.

  16. CGE simulation analysis on the labor transfer, agricultural technical progress, and economic development in Chongqing.

    PubMed

    Wang, Heng; Ran, Maosheng

    2014-01-01

    The basic structure of a CGE model dividing Mainland China into two parts, including Chongqing and rest regions, is described. Based on this CGE model, both the unilateral impact and collaborative impact of two policies, agricultural technical progress and supporting policies for improving rural labor transfer on the economic development in Chongqing, are simulated and analyzed. The results demonstrate that compared with the sum of each unilateral policy effect, the collaboration of two policies has more effective impact on facilitating the labor transfer, promoting regional economic growth, and improving income and welfare of urban and rural residents.

  17. [Experimental and theoretical plasma physics program]. Technical progress [in FY 1981

    SciTech Connect

    Griem, H.

    1981-12-31

    In recent years, members of the Maryland Theory Group have made significant contributions to the national fusion theory programs and in many cases these theoretical development helped to interpret experimental results and to design new experimental programs. In the following, the authors summarize the technical progress in five major areas: (1) rf interaction with plasmas including wave propagation, rf heating, rf induced runaways and current drive; (2) spheromak -- formation, equilibrium, and stability; (3) stability of nonaxisymmetric systems (EBT, mirror, etc.); (4) stability theory of toroidal plasmas -- tokamak, RFP, etc.; and (5) nonlinear theory.

  18. Demonstrate fuel disassembly/encapsulation. Technical progress report, April 1981-June 1981

    SciTech Connect

    1981-08-03

    Work on this project is focused on demonstrating disassembly and encapsulation of nuclear fuels as a means to increase spent fuel storage. The effort commenced on April 17, 1980, and is progressing satisfactorily. The Equipment/Procedure Preparation sub-task is essentially complete. The Equipment Demonstration sub-task and the Process Assessment Studies sub-task continue. The equipment design effort associated with the first sub-task, the component testing and checking associated with the second sub-task, and the technical studies and investigations associated with the latter sub-task continue to verify the feasibility of this concept to enhance the use of fuel storage resources.

  19. Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1993

    SciTech Connect

    Not Available

    1993-04-01

    This reports reports the progress/efforts performed on six technical projects: 1. systematic assessment of the state of hazardous waste clean-up technologies; 2. site remediation technologies (SRT):drain- enhanced soil flushing for organic contaminants removal; 3. SRT: in situ bio-remediation of organic contaminants; 4. excavation systems for hazardous waste sites: dust control methods for in-situ nuclear waste handling; 5. chemical destruction of polychlorinated biphenyls; and 6. development of organic sensors: monolayer and multilayer self-assembled films for chemical sensors.

  20. CGE Simulation Analysis on the Labor Transfer, Agricultural Technical Progress, and Economic Development in Chongqing

    PubMed Central

    Wang, Heng; Ran, Maosheng

    2014-01-01

    The basic structure of a CGE model dividing Mainland China into two parts, including Chongqing and rest regions, is described. Based on this CGE model, both the unilateral impact and collaborative impact of two policies, agricultural technical progress and supporting policies for improving rural labor transfer on the economic development in Chongqing, are simulated and analyzed. The results demonstrate that compared with the sum of each unilateral policy effect, the collaboration of two policies has more effective impact on facilitating the labor transfer, promoting regional economic growth, and improving income and welfare of urban and rural residents. PMID:24892037

  1. Volatiles combustion in fluidized beds. Technical progress report, 4 March 1993--3 June 1993

    SciTech Connect

    Hesketh, R.P.

    1993-09-01

    The goal of this project is to investigate the conditions in which volatiles will burn within both the dense and freeboard regions of fluidized beds. Experiments using a fluidized bed operated at incipient fluidization will be performed to characterize the effect of particle surface area, initial fuel concentration, and particle type on the inhibition of volatiles within a fluidized bed. The work conducted during the period 4 March, 1993 through 3 June, 1993 is reported in this technical progress report. The work during this time period consists primarily of the startup and trouble shooting of the fluidized bed reactor and gas phase modeling of methane and propane.

  2. Lake Roosevelt White Sturgeon Recovery Project : Annual Progress Report, January 2003 – March 2004.

    SciTech Connect

    Howell, Matthew D.; McLellan, Jason G.

    2009-07-15

    This report summarizes catch data collected from white sturgeon Acipenser transmontanus in Lake Roosevelt during limited setlining and gill netting activities in the fall of 2003, and documents progress toward development of a U.S. white sturgeon conservation aquaculture program for Lake Roosevelt. From 27-30 October, 42 overnight small mesh gill net sets were made between Marcus and Northport, WA for a total catch of 15 juvenile white sturgeon (275-488 mm FL). All sturgeon captured were of Canadian hatchery origin. These fish had been previously released as sub-yearlings into the Canadian portion (Keenleyside Reach) of the Transboundary Reach of the Columbia River during 2002 and 2003. Most sturgeon (n=14) were caught in the most upstream area sampled (Northport) in low velocity eddy areas. Five fish exhibited pectoral fin deformities (curled or stunted). Growth rates were less than for juvenile sturgeon captured in the Keenleyside Reach but condition factor was similar. Condition factor was also similar to that observed in juvenile sturgeon (ages 1-8) captured in the unimpounded Columbia River below Bonneville Dam between 1987-92. From 10-14 November, 28 overnight setline sets were made in the Roosevelt Reach between the confluence of the Spokane River and Marcus Island for a total catch of 17 white sturgeon (94-213 cm FL). Catch was greatest in the most upstream areas sampled, a distribution similar to that observed during a WDFW setline survey in Lake Roosevelt in 1998. The mean W{sub r} index of 110% for fish captured this year was higher than the mean W{sub r} of 91% for fish captured in 1998. Excellent fish condition hindered surgical examination of gonads as lipid deposits made the ventral body wall very thick and difficult to penetrate with available otoscope specula. Acoustic tags (Vemco model V16 coded pingers, 69 kHz, 48-month life expectancy) were internally applied to 15 fish for subsequent telemetry investigations of seasonal and reproductively

  3. Progress in understanding the importance of coastal wetland nursery habitat to Great Lakes fisheries support

    EPA Science Inventory

    Great Lakes coastal wetlands provide important habitat for Great Lakes fishes of all life stages. A literature review of ichthyoplankton surveys conducted in Great Lakes coastal wetlands found at least 82 species reported to be captured during the larval stage. Twenty of those sp...

  4. Progress in understanding the importance of coastal wetland nursery habitat to Great Lakes fisheries support

    EPA Science Inventory

    Great Lakes coastal wetlands provide important habitat for Great Lakes fishes of all life stages. A literature review of ichthyoplankton surveys conducted in Great Lakes coastal wetlands found at least 82 species reported to be captured during the larval stage. Twenty of those sp...

  5. Heber geothermal binary demonstration project quarterly technical progress report, July 1, 1981--September 30, 1981

    SciTech Connect

    Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

    1983-08-01

    The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of July 1, 1981, through September 30, 1981. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the US Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  6. Heber geothermal binary demonstration project quarterly technical progress report, October 1, 1982--December 31, 1982

    SciTech Connect

    Lacy, R.G.; Allen, R.F.; Dixon, J.R.; Hsiao, W.P.; Liparidis, G.S.; Lombard, G.L.; Nelson, T.T.; Van De Mark, G.D.

    1983-05-01

    The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of October 1, 1982--December 31, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  7. Wisconsin's Lake Superior Basin Water Quality Study. Technical Report No. 1.

    ERIC Educational Resources Information Center

    Dickas, Albert B., Ed.

    This hydrologic study focuses on Wisconsin's Lake Superior Basin. Water is the most important natural resource in this area which includes Douglass, Bayfield, Ashland, and Iron counties. This study was undertaken to determine the character of this hydrologic base and to determine the effects and extent of man-influenced disturbances. It includes…

  8. Wisconsin's Lake Superior Basin Water Quality Study. Supplement. Technical Report No. 2.

    ERIC Educational Resources Information Center

    Whisnant, David M., Ed.

    During the period extending from May 1972 through April 1973, an investigation of the overall water quality conditions of streams flowing into Lake Superior from the entire state of Wisconsin was conducted. The goal of this publication was to provide much needed regional information on water quality, drainage basins, pollution sources and loads,…

  9. Wisconsin's Lake Superior Basin Water Quality Study. Supplement. Technical Report No. 2.

    ERIC Educational Resources Information Center

    Whisnant, David M., Ed.

    During the period extending from May 1972 through April 1973, an investigation of the overall water quality conditions of streams flowing into Lake Superior from the entire state of Wisconsin was conducted. The goal of this publication was to provide much needed regional information on water quality, drainage basins, pollution sources and loads,…

  10. Wisconsin's Lake Superior Basin Water Quality Study. Technical Report No. 1.

    ERIC Educational Resources Information Center

    Dickas, Albert B., Ed.

    This hydrologic study focuses on Wisconsin's Lake Superior Basin. Water is the most important natural resource in this area which includes Douglass, Bayfield, Ashland, and Iron counties. This study was undertaken to determine the character of this hydrologic base and to determine the effects and extent of man-influenced disturbances. It includes…

  11. Residues in cutthroat trout (Salmo clarki) and California newts (Tarichia torosa) from a lake treated with technical chlordane.

    PubMed

    Albright, L J; Oloffs, P C; Szeto, S Y

    1980-01-01

    The water of a lake was sprayed with technical chlordane to give a concentration of approximately 10 ppb. Resident California newts (Tarichia torosa) and cutthroat trout (Salmo clarki) were subsequently collected and analyzed for residue concentrations. The newts were collected at 14, 279, 451, and 1,036 days; the trout at 93, 279, 421, and 1,014 days. At first, the concentrations of residues were very high in both species and their composition, except for heptachlor, resembled that of technical chlordane. The heptachlor was quantitatively epoxidized in news after 14 days but in trout, some heptachlor was still present after 93 days. Concentrations of total chlordane in body tissues of both species declined more than 98% with time. Of seven individually determined constituents of technical chlordane, trans-nonachlor was by far the most persistent, accounting for 49 to 55% of total chlordane in specimens collected last. Both animals produced oxychlordane, probably from gamma-chlordane. Heptachlor, heptachlor epoxide and gamma-chlordeine were non-detectable in both species after 279 days. The results strongly suggest that the California newt metabolizes and eliminates chlordane residues more effectively than the cutthroat trout.

  12. The Development and Technical Adequacy of Seventh-Grade Reading Comprehension Measures in a Progress Monitoring Assessment System. Technical Report #1102

    ERIC Educational Resources Information Center

    Park, Bitnara Jasmine; Alonzo, Julie; Tindal, Gerald

    2011-01-01

    This technical report describes the process of development and piloting of reading comprehension measures that are appropriate for seventh-grade students as part of an online progress screening and monitoring assessment system, http://easycbm.com. Each measure consists of an original fictional story of approximately 1,600 to 1,900 words with 20…

  13. Advancement of flash hydrogasification. Quarterly technical progress report, January-March 1984

    SciTech Connect

    Falk, A.Y.

    1984-06-25

    This first quarterly report documents technical progress during the period 31 December 1983 through 30 March 1984. The technical effort is 17 months in duration and is divided into two major technical tasks: Task VII, Hardware Fabrication and PDU Modifications, and Task VIII, Performance Testing. The design of test hardware and process development unit modifications had been previously completed as part of Task VI of the current contract. Task VII involves the fabrication of test hardware and modification of an existing 1-ton/h hydroliquefaction PDU at Rockwell's facilities for use as a hydrogasifier test facility. During this report period, fabrication of the test hardware and modifications to the PDU were initiated. Test hardware fabrication is now approximately 80% complete and should be completed by the end of May 1984. PDU modifications are progressing well and should be completed by the end of June 1984. The completed test hardware fabrication and PDU modifications will allow the conduct of short duration (1 to 2 h) hydrogasification tests along with preburner assembly performance evaluation tests in order to fulfill the test program objectives. Separate supplies of hydrogen, oxygen, methane, carbon monoxide, and water (for steam generation) are provided for this purpose. The modified facility is designed to accommodate both 10- and 20-ft-long hydrogasifier reactors so that residence times will be in the range of 2 to 6 s when coal is fed at a nominal 1/2 ton/h into reactors at 1000 psia pressure. Provisions are being made for real-time analysis of the product gases using an on-line gas chromatograph system. Test planning was the only Task VIII effort active during this report period. An initial (preliminary) test matrix has been defined. Preparation of a data analysis plan is underway, and data reduction programs are being programmed. 17 references, 25 figures, 6 tables.

  14. Projects at the Component Development and Integration Facility. Quarterly technical progress report, July 1--September 30, 1993

    SciTech Connect

    Not Available

    1993-12-31

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the first quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept project; mine waste technology pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

  15. Projects at the Component Development and Integration Facility. Quarterly technical progress report, April 1--June 30, 1993

    SciTech Connect

    Not Available

    1993-12-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project; and Spray Casting Project.

  16. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    SciTech Connect

    Not Available

    1994-08-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

  17. Projects at the Component Development and Integration Facility. Quarterly technical progress report, October 1--December 31, 1992

    SciTech Connect

    Not Available

    1992-12-31

    This quarterly technical progress report presents progress on the projects at the component Development and Integration Facility (CDIF) during the first quarter of FY93. The CDIF is a major US Department of Energy (DOE) test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD proof-of-concept project; mine waste pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

  18. Great Lakes water quality initiative technical support document for the procedure to determine bioaccumulation factors. Draft report

    SciTech Connect

    Not Available

    1993-03-01

    The purpose of the document is to provide the technical information and rationale in support of the proposed procedures to determine bioaccumulation factors. Bioaccumulation factors, together with the quantity of aquatic organisms eaten, determine the extent to which people and wildlife are exposed to chemicals through the consumption of aquatic organisms. The more bioaccumulative a pollutant is, the more important the consumption of aquatic organisms becomes as a potential source of contaminants to humans and wildlife. Bioaccumulation factors are needed to determine both human health and wildlife tier I water quality criteria and tier II values. Also, they are used to define Bioaccumulative Chemicals of Concern among the Great Lakes Initiative universe of pollutants. Bioaccumulation factors range from less than one to several million.

  19. Progress report: chemical character of surface waters in the Devils Lake Basin, North Dakota

    USGS Publications Warehouse

    Swenson, Herbert A.

    1950-01-01

    Devils Lake in northeastern North Dakota was at one time the most popular summer resort in the state. With decline in lake level the lake has become a shallow body pf vary saline water, which scenic value and recreational appeal completely destroyed. Under the Missouri River development program, it is proposed to restore the lake level to an altitude of 1,425 feet by diversion of Missouri River water. The chemical character of the water in Devils Lake and in other surface bodies in Devils Lake Basin is determined from the analyses of 95 samples. The physical and chemical properties of lake bed deposits are also shown. Lake water in the basin vary considerable in both concentration and composition, ranging from fresh bicarbonate waters of 300 parts per million dissolved solids to sulfate waters of over 100,000 parts per million of soluble salts. Twenty-four samples indicates the chemical character of water in the Red River of the North and its tributaries. The probable concentration of dissolved solids in water of Devils Lake at altitude 1,425 feet has been estimated as ranging from 3,000 to 7,600 parts per million. Final concentration will largely depend upon the percentage of deposited salts reentering solution and the quality of the inflow water. The possible effects of lake effluents on downstream developments, with particular reference to sanitation and pollution problems, are also discussed in this report.

  20. Technical report for the alkali lake ecological assessment, phase 1 reconnaissance (FY 91 and FY 92)

    SciTech Connect

    Linder, G.

    1993-03-01

    The report summarizes the results of three field survey trips (June and September 1991, May 1992) taken to investigate the ecological effects associated with the release of over a million gallons of hazardous waste from herbicide production on the Alkali Lake playa. Sampling of soil, sediment, groundwater, soil-dwelling invertebrates and vegetation confirmed that hazardous materials from the waste disposal area are migrating westerly within the shallow aquifer to West Alkali Lake. Two areas of dead vegetation were identified and permanently marked to determine if these areas are changing in size and location. Preliminary calculations using a linear food-chain model suggested that small mammalian herbivores would probably not display adverse effects due to dietary exposures to the contaminants. However, nestling shorebirds may be exposed to concentrations potentially associated with adverse biological effects.

  1. [Pulsed atmospheric fluidized bed combustion (PAFBC)]. Technical progress report, May--July 1988

    SciTech Connect

    Not Available

    1988-10-01

    This first Quarterly Technical Progress Report presents the results of work accomplished during the period April 19 through July 24,1988. The overall objective of the program is the development of a pulsed atmospheric fluidized-bed combustion (PAFBC) technology to burn coal and to provide heat and steam to commercial, institutional, and small industrial applications at a reasonable price in an environmentally acceptable manner. the program scope consisted of two tasks; the first was to establish preliminary feasibility by the use of theoretical and state-of-the-art information. This task was completed during the first quarter of the contract period and a topical report entitled, ``Pulsed Atmospheric Fluidized Bed combustion (PAFBC) - Preliminary Feasibility Study`` was prepared as a ``decision point to proceed`` deliverable in accordance with the terms of the contract. This first quarterly progress report therefore covers the contract activities subsequent to the approval of the feasibility study and the decision to proceed with the Task 2 effort. As the initial quarterly technical progress report, this document includes a subsection on background which will be omitted in subsequent reports. All effort during this period was devoted to the design and analysis of the PAFBC. Design drawings were prepared and fabrication and procurement initiated. Quotations were evaluated and a fabrication contract awarded. A site adjacent to the MTCI building was chosen for the installation of the PAFBC. Some ancillary components were purchased, renovated, and tested. Some delays in delivery of components have resulted in some schedule delay. It is anticipated that the program pace will accelerate as soon as parts are received and installation and assembly are initiated. 10 figs.,1 tab.

  2. Archaeological and Geomorphological Data Recovery at Saylorville Lake, Polk County, Iowa. Volume 1. Technical Report.

    DTIC Science & Technology

    1984-12-01

    Mustard) Chenopodium sp. X X (Goosefoot*) Ipamoea purpurea X . (Common Morning Glory) Polygonum sp. X X X (Smartweed) Portulaca oleracea X X (Common...transect lines to record the nature and thickness of the upper soil layers. On the basis of these observations a location was then selected for obtaining...hovel Test: a Excavation Units: a Site Area Boundary: . 833’ contour line was normal lake / level prior to October 1983. (See Figure 12 for detail of

  3. Habitat Evaluation Procedures (HEP) Report : West Beaver Lake, 2004-2005 Technical Report.

    SciTech Connect

    Entz, Ray

    2005-02-01

    On September 7, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the West Beaver Lake property, an acquisition completed by the Kalispel Tribe of Indians in September 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The West Beaver Lake Project provides a total of 103.08 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 7.17 HUs for mallard and muskrat. Conifer forest habitat provides 95.91 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. The objective of using HEP at the West Beaver Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  4. Arrow Lakes Reservoir Fertilization Experiment; Years 4 and 5, Technical Report 2002-2003.

    SciTech Connect

    Schindler, E.

    2007-02-01

    This report presents the fourth and fifth year (2002 and 2003, respectively) of a five-year fertilization experiment on the Arrow Lakes Reservoir. The goal of the experiment was to increase kokanee populations impacted from hydroelectric development on the Arrow Lakes Reservoir. The impacts resulted in declining stocks of kokanee, a native land-locked sockeye salmon (Oncorhynchus nerka), a key species of the ecosystem. Arrow Lakes Reservoir, located in southeastern British Columbia, has undergone experimental fertilization since 1999. It is modeled after the successful Kootenay Lake fertilization experiment. The amount of fertilizer added in 2002 and 2003 was similar to the previous three years. Phosphorus loading from fertilizer was 52.8 metric tons and nitrogen loading from fertilizer was 268 metric tons. As in previous years, fertilizer additions occurred between the end of April and the beginning of September. Surface temperatures were generally warmer in 2003 than in 2002 in the Arrow Lakes Reservoir from May to September. Local tributary flows to Arrow Lakes Reservoir in 2002 and 2003 were generally less than average, however not as low as had occurred in 2001. Water chemistry parameters in select rivers and streams were similar to previous years results, except for dissolved inorganic nitrogen (DIN) concentrations which were significantly less in 2001, 2002 and 2003. The reduced snow pack in 2001 and 2003 would explain the lower concentrations of DIN. The natural load of DIN to the Arrow system ranged from 7200 tonnes in 1997 to 4500 tonnes in 2003; these results coincide with the decrease in DIN measurements from water samples taken in the reservoir during this period. Water chemistry parameters in the reservoir were similar to previous years of study except for a few exceptions. Seasonal averages of total phosphorus ranged from 2.11 to 7.42 {micro}g/L from 1997 through 2003 in the entire reservoir which were indicative of oligo-mesotrophic conditions

  5. Habitat Evaluation Procedures (HEP) Report; West Beaver Lake Project, Technical Report 2005

    SciTech Connect

    Entz, Ray

    2005-05-01

    On September 7, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the West Beaver Lake property, an acquisition completed by the Kalispel Tribe of Indians in September 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The West Beaver Lake Project provides a total of 82.69 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 8.80 HUs for mallard, muskrat, and Canada goose. Conifer forest habitat provides 70.33 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Open water provides 3.30 HUs for mallard, muskrat, and Canada goose. The objective of using HEP at the West Beaver Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  6. Habitat Evaluation Procedures (HEP) Report; North Eaton Lake, Technical Report 2005.

    SciTech Connect

    Entz, Ray

    2005-11-01

    On July 6, 2005, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the North Eaton Lake property, an acquisition completed by the Kalispel Tribe of Indians in November 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The North Eaton Lake Project provides a total of 235.05 Habitat Units (HUs) for the species evaluated. Open water habitat provides 9.38 HUs for Canada goose, mallard and muskrat. Emergent wetland habitat provides 11.36 HUs for Canada goose, mallard and muskrat. Forested wetland provides 10.97 HUs for bald eagle, black-capped chickadee, mallard and white-tailed deer. Conifer forest habitat provides 203.34 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. The objective of using HEP at the North Eaton Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  7. Fiber-optic, anti-cycling, high pressure sodium street light control. Final technical progress report

    SciTech Connect

    1995-05-01

    This is the Final Technical Progress Report on a project to develop and market a Fiber-Optic Anti-Cycling High Pressure Sodium Street Light Control. The field test units are now being made with a single vertical PC board design and contains a computer-on-a-chip or PROM IC to take the place of the majority of the components previously contained on the upper logic board. This will reduce the final costs of the unit when it is in production and increase the control`s flexibility. The authors have finished the soft tooling and have made the 400 plastic cases for the field test units. The new configuration of the cases entails a simplified design of the control shell which will have the lenses cast in place. The shell and base plastics are now finished and in final assembly awaiting the completion of the PC boards.

  8. Pipeline gas demonstration plant, Phase I. Quarterly technical progress report for September 1980-November 1980

    SciTech Connect

    Eby, R.J.

    1980-12-01

    Work was performed in the following tasks in Phase I of the Pipeline Gas Demonstration Plant Program: Site Evaluation and Selection; Demonstration Plant Environmental Analysis; Feedstock Plans, Licenses, Permits and Easements; Demonstration Plant Definitive Design; Construction Planning; Economic Reassessment; Technical Support; Long Lead Procurement List; and Project Management. The Preliminary Construction Schedule was delivered to the Government on October 3, 1980, constituting an early delivery of the construction schedule called for in the scope of work for Task VI. The major work activity continues to be the effort in Task VI, Demonstration Plant Definitive Design, with two 30% Design Review meetings being held with the Government. Work in Task VII, Construction Planning, was initiated. Work has progressed satisfactorily in the other tasks in support of the Demonstration Plant Program. A Cost Change Proposal was submitted because of an increase in the scope of work and an extension of the schedule for Phase I to 47 months.

  9. Coal liquefaction process streams characterization and evaluation. Quarterly technical progress report, July 1--September 30, 1992

    SciTech Connect

    Brandes, S.D.; Winschel, R.A.; Burke, F.P.

    1992-11-01

    This is the twelfth Quarterly Technical Progress Report under DOE Contract DE-AC22-89PC89883. Major topics reported are: Summaries of the final reports produced by Lehigh University, West Virginia University, and Vander Sande Associates under the Participants Program are presented. Analytical data produced by CONSOL are provided in Appendix I for all samples employed in the Participants Program and issued with the samples to research groups in the Participants Program. A paper was presented at the 1992 US Department of Energy Pittsburgh Energy Technology Center Liquefaction Contractors` Review Conference, held in Pittsburgh September 23--24, 1992, entitled ``The Chemical Nature of Coal Liquid Resids and the Implications for Process Development``. It appears as Appendix 2 in this report.

  10. Responsive copolymers for enhanced petroleum recovery. Quarterly technical progress report, June 23--September 21, 1994

    SciTech Connect

    McCormick, C.; Hester, R.

    1994-12-31

    Summaries are given on the technical progress on three tasks of this project. Monomer and polymer synthesis discusses the preparation of 1(7-aminoheptyloxymethyl)naphthalene and poly(maleic anhydride-alt-ethyl vinyl ether). Task 2, Characterization of molecular structure, discusses terpolymer solution preparation, UV analysis, fluorescence analysis, low angle laser light scattering, and viscometry. The paper discusses the effects of hydrophobic groups, the effect of pH, the effect of electrolyte addition, and photophysical studies. Task 3, Solution properties, describes the factorial experimental design for characterizing polymer solutions by light scattering, the light scattering test model, orthogonal factorial test design, linear regression in coded space, confidence level for coded space test mode coefficients, coefficients of the real space test model, and surface analysis of the model equations.

  11. Energy conservation in citrus processing. Technical progress report, October 1, 1979-March 31, 1980

    SciTech Connect

    Not Available

    1980-06-15

    The principal objective of the work is to identify an economically viable alternative to the existing method of meeting the energy requirements of citrus fruit processing that will substantially reduce the overall energy usage of citrus processing plants. The components which will make up the alternative systems include: evaporators, dryers, refrigeration units, heat pumps, heat engines, heat exchangers, thermal storage units, and ancillary components. These components will be used to form the five operational units of the citrus processing plant. These operational units are: evaporation, drying, refrigeration, pasteurizing and canning, and the plant electrical load that consists of operations such as conveying and juice extraction. The five operational units are then interrelated to varying degrees with respect to energy exchange to form different types of alternative systems. The approach, work plan, and progress of technical work are summarized. (MCW)

  12. Energy conservation in citrus processing. Technical progress report, October 1, 1979-March 31, 1980

    SciTech Connect

    Not Available

    1980-06-15

    The Sunkist Citrus Plant in Ontario, California, processes about 6 million pounds of citrus fruit per day to make products which include frozen concentrated juice; chilled, pasteurized, natural strength juice; molasses from peel; dried meal from peel; pectin; citrus oil; and bioflavonoids. The energy intensive operations at the plant include concentration, drying, and refrigeration. The objective of the two-year two-phase project is to identify an economically viable alternative to the existing method of meeting energy requirements. Progress on the technical work of Phase I is reported. The following are summarized: requirements (energy price projection, atmospheric emission requirements, citrus juice quality constraints, economic evaluations); characterization (basic citrus processing operations, energy consumption and fruit processed vs time, identification and measurement of energy uses, energy balance for a typical citrus juice evaporator); and thermodynamic analysis (heat pump model, thermal evaporator, and co-generation model).

  13. Spray forming -- Aluminum: Third annual report (Phase 2). Technical progress -- Summary

    SciTech Connect

    Kozarek, R.L.

    1998-04-20

    Commercial production of aluminum sheet and plate by spray atomization and deposition is a potentially attractive manufacturing alternative to conventional ingot metallurgy/hot-milling and to continuous casting processes because of reduced energy requirements and reduced cost. To realize the full potential of the technology, the Aluminum Company of America (Alcoa), under contract by the US Department of Energy, is investigating currently available state-of-the-art atomization devices to develop nozzle design concepts whose spray characteristics are tailored for continuous sheet production. This third technical progress report will summarize research and development work conducted during the period 1997 October through 1998 March. Included are the latest optimization work on the Alcoa III nozzle, results of spray forming runs with 6111 aluminum alloy and preliminary rolling trials of 6111 deposits.

  14. Soot formation in synthetic-fuel droplets. First quarterly technical progress report

    SciTech Connect

    England, G.; Kramlich, J.; Payne, R.

    1981-01-01

    The objective of this project is to provide detailed information on methods of minimizing soot formation during synthetic liquid fuel combustion under conditions which minimize fuel nitrogen conversion to nitric oxide. The program consists of two tasks. The purpose of the first task, Fuel Screening Studies, is to investigate the impact of fuel properties on particulate production, to establish the importance of droplet size and examine atomizer effects, and to develop techniques for surrogate fuels productions. In the second task, Flame Studies, the fundamental details of soot formation from synfuel droplet combustion will be investigated in variable slip velocity configurations. This present report describes technical progress during the first three months of the program effort (October-December 1980). During this initial period, attention has focused on the definition of the different experimental efforts and on the design and construction of the required hardware. Aspects of this work are discussed.

  15. Quarterly technical progress report, October-December 1982 on Energy Conversion Research and Development Programs

    SciTech Connect

    Not Available

    1983-10-01

    In this quarterly technical progress report, UTSI reports on the continued design work for the low mass flow train superheater. The detailed design of this component continued and the overall arrangement drawing for the superheater and air heater was finalized. The air heater procurement reached the point of contract award, but the actual purchase order award was held up pending receipt of additional funding from the Department of Energy. Testing activity reported includes two additional tests in the LMF1C series, which concludes this test series. Test data are presented, along with preliminary analyses for the combustor, nozzle, diagnostic channel, diffuser, radiant furnace/secondary combustor and Materials Test Module. In addition to the nitrogen oxide test measurements, corrosion and erosion rates for the boiler tube specimens and the materials test module are reported.

  16. Power systems development facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    SciTech Connect

    Not Available

    1994-07-01

    This quarterly technical progress report summarizes work completed during the last quarter of the Second Budget Period, January 1 through March 31, 1994, entitled {open_quotes}Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.{close_quotes} The objective of this project is to evaluate hot gas particulate control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size.

  17. PFBC HGCU Test Facility. Technical progress report: Third Quarter, CY 1993

    SciTech Connect

    Not Available

    1993-10-01

    This is the sixteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC (pressurized fluidized-bed combustion) Hot Gas Clean Up Test Facility (HGCU). This report covers the period of work completed during the Third Quarter of CY 1993. During this quarter, the Advanced Particle Filter (APF) was operated for a total of 1295 hours. This represents 58% availability during July, August, September, and including June 30 of the previous quarter. The operating dates and times since initial operation are summarized. The APF operating temperatures and differential pressures are provided. Details of the APF runs during this quarter are included in this report.

  18. MHD air heater development technology. Technical progress report, July 1-September 30, 1980

    SciTech Connect

    1980-11-01

    The technology development of the directly-fired high temperature air heater (HTAH) for MHD power plants is described. Progress is reported on the three tasks. The first task is materials selection, evaluation, and development. The objective of this task is to continue development of ceramic materials technology for the directly-fired HTAH. Task two is operability, performance, and materials testing. The objectives of this task are to demonstrate the technical feasibility of operating a directly-fired HTAH (including both the heater matrix and valves), to continue obtaining information on life and corrosion resistance of HTAH materials, and to obtain design information for full-scale studies and future design work. The objectives of the full-scale design task are to begin the identification of HTAH control requirements and control system needs, and to continue full-scale study efforts incorporating updated materials and design information in order to identify development needs for the HTAH development program. (WHK)

  19. Study of electric field and ion effects on HVDC lines: Technical progress report No. 10

    SciTech Connect

    Johnson, G.B.; Clairmont, B.A.; Carter, P.J.

    1987-03-01

    A description of the size-charge equipment and the basic theory of charged aerosol motion has been presented in previous Technical Progress reports. This report provides a more detailed look at the device and an explanation of the modifications made to develop the instrument to its present state. A number of measurements were made under various conditions to calibrate the instrument package, check its reliability and repeatability, and to perform a preliminary investigation into the characterization of the size-charge distribution of aerosols downwind from HVDC transmission lines. This report also presents results of measurements of the space charge above ground near the DC Pacific Intertie at the Bonneville Power Administration's DC test site near Grizzly Mountain in central Oregon. The measurements were made with a space charge cage carried aloft by helium balloons.

  20. MHD Integrated Topping Cycle Project. Seventeenth quarterly technical progress report, August 1, 1991--October 31, 1991

    SciTech Connect

    Not Available

    1992-07-01

    This seventeenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period August 1, 1991 to October 31, 1991. Manufacturing of the prototypical combustor pressure shell has been completed including leak, proof, and assembly fit checking. Manufacturing of forty-five cooling panels was also completed including leak, proof, and flow testing. All precombustor internal components (combustion can baffle and swirl box) were received and checked, and integration of the components was initiated. A decision was made regarding the primary and backup designs for the 1A4 channel. The assembly of the channel related prototypical hardware continued. The cathode wall electrical wiring is now complete. The mechanical design of the diffuser has been completed.

  1. Characterization of oil and gas reservoir heterogeneity. Technical progress report, July 1, 1992--September 30, 1992

    SciTech Connect

    Sharma, G.D.

    1992-12-01

    The ultimate oojective of this cooperative research project is to characterize Alaskan petroleum reservoirs in terms of their reserves, physical and chemical properties, geologic configuration in relation to lithofacies and structure, and development potential. The project has two tasks: Task 1 is a geological description of the reservoirs including petrophysical properties, i.e., porosity, permeability, permeability variation, formation depth, temperature, and net pay, facies changes and reservoir structures as drawn from cores, well logs, and other geological data. Task 2 is reservoir fluid characterization--determination of physical properties of reservoir fluids including density, viscosity, phase distributions and composition as well as petrogenesis--source rock identification; and the study of asphaltene precipitation for Alaskan crude oils. This report presents a summary of technical progress of the well log analysis of Kuparuk Field, Northslope, Alaska.

  2. MHD air heater technology development. Annual technical progress report, January 1, 1980-December 31, 1980

    SciTech Connect

    1981-03-01

    Progress on the technology development of the directly-fired high temperature air heater (HTAH) for MHD power plants is described in detail. The objective of task 1 is to continue development of ceramic materials technology for the directly-fired HTAH. The objectives of task 2 are to demonstrate the technical feasibility of operating a directly-fired HTAH (including both the heater matrix and valves), to continue obtaining information on life and corrosion resistance of HTAH materials, and to obtain design information for full-scale studies and future design work. The objectives of task 3 are to begin the identification of HTAH control requirements and control system needs, and to continue full-scale study efforts incorporating updated materials and design information in order to identify development needs for the HTAH development program. (WHK)

  3. Technical reviews of cleanup and R and D results. Final technical progress report, March 15, 1982-December 30, 1983

    SciTech Connect

    Stopek, D.J.

    1984-01-16

    SAI reviewed for METC several reports on hot gas cleanup of flue gas, flue gas desulfurization methods and on materials and research programs on heat engines. The work done is listed here without technical discussion. (LTN)

  4. Habitat Evaluation Procedures (HEP) Report; Steigerwald Lake National Wildlife Refuge, Technical Report 2000-2001.

    SciTech Connect

    Allard, Donna

    2001-09-01

    Steigenvald Lake National Wildlife Refuge (NWR, refuge) was established as a result of the U. S. Army Corps of Engineers (COE) transferring ownership of the Stevenson tract located in the historic Steigerwald Lake site to the U.S. Fish and Wildlife Service (FWS, Service) for the mitigation of the fish and wildlife losses associated with the construction of a second powerhouse at the Bonneville Dam on the Columbia River and relocation of the town of North Bonneville (Public Law 98-396). The construction project was completed in 1983 and resulted in the loss of approximately 577 acres of habitat on the Washington shore of the Columbia River (USFWS, 1982). The COE determined that acquisition and development of the Steigenvald Lake area, along with other on-site project management actions, would meet their legal obligation to mitigate for these impacts (USCOE, 1985). Mitigation requirements included restoration and enhancement of this property to increase overall habitat diversity and productivity. From 1994 to 1999, 317 acres of additional lands, consisting of four tracts of contiguous land, were added to the original refuge with Bonneville Power Administration (BPA) funds provided through the Washington Wildlife Mitigation Agreement. These tracts comprised Straub (191 acres), James (90 acres), Burlington Northern (27 acres), and Bliss (9 acres). Refer to Figure 1. Under this Agreement, BPA budgeted $2,730,000 to the Service for 'the protection, mitigation, and enhancement of wildlife and wildlife habitat that was adversely affected by the construction of Federal hydroelectric dams on the Columbia River or its tributaries' in the state of Washington (BPA, 1993). Lands acquired for mitigation resulting from BPA actions are evaluated using the habitat evaluation procedures (HEP) methodology, which quantifies how many Habitat Units (HUs) are to be credited to BPA. HUs or credits gained lessen BPA's debt, which was formally tabulated in the Federal Columbia River Power

  5. Dating of sediments from four Swiss prealpine lakes with (210)Pb determined by gamma-spectrometry: progress and problems.

    PubMed

    Putyrskaya, V; Klemt, E; Röllin, S; Astner, M; Sahli, H

    2015-07-01

    In this paper the most important problems in dating lake sediments with unsupported (210)Pb are summarized and the progress in gamma-spectrometry of the unsupported (210)Pb is discussed. The main topics of these studies concern sediment samples preparation for gamma-spectrometry, measurement techniques and data analysis, as well as understanding of accumulation and sedimentation processes in lakes. The vertical distributions of artificial ((137)Cs, (241)Am, (239)Pu) and natural radionuclides ((40)K, (210,214)Pb, (214)Bi) as well as stable trace elements (Fe, Mn, Pb) in sediment cores from four Swiss lakes were used as examples for the interpretation, inter-comparison and validation of depth-age relations established by three (210)Pb-based models (CF-CSR, CRS and SIT). The identification of turbidite layers and the influence of the turbidity flows on the accuracy of sediment dating is demonstrated. Time-dependent mass sedimentation rates in lakes Brienz, Thun, Biel and Lucerne are discussed and compared with published data.

  6. Chemistry and reactivity of micronized coals: Technical progress report No. 5

    SciTech Connect

    Lloyd, W.G.; Riley, J.T.; Kuehn, K.W.; Kuehn, D.W.

    1986-11-15

    This project examines the effect of ultrafine milling of mid-rank coals (to mean size below 10 microns) upon their physical and chemical properties. Additional float-sink studies of attritor-milled coals, before and after beneficiation, confirm the observation in the previous Technical Progress Report that extended milling results in compaction, collapse of micropore structure, and significant increase in coal particle density. Using precleaned coal, the float fraction at Specific Gravity 1.35 increases with initial milling - owing to the mechanical separation of mineral matter - then falls progressively with additional milling time. For extended milling runs the float fraction at S.G. 1.35 is essentially nil. This phenomenon may also explain the failure of exhaustively milled coals to show greater reactivity towards liquefaction. Our results to date indicate that optimum attritor milling times are in the range 1 to 10 minutes. Milling variables have been systematically reviewed, using the VPI mill with aqueous dispersions of -60 mesh WKY No. 9 coal. In this system the most effective size reductions, based upon sieve analyses and wattmeter measurements, are with 1/4 inch stainless steel media, agitator speed 290 to 350 rpm, charge and media filling the container about 2/3rds full at rest, coal charged at 40 to 50% V/V (45 to 55% W/W), and milling periods (depending upon application) of 1 to 4 minutes. 7 refs.

  7. The magnetohydrodynamics Coal-Fired Flow Facility. Technical progress report, July 1, 1992--September 30, 1992

    SciTech Connect

    Not Available

    1993-02-01

    In this quarterly technical progress report, UTSI reports on progress on a multi-task contract to develop the technology for the steam bottoming plant for an MHD Steam Combined Cycle power plant. Two proof-of-concept (POC) tests totaling 614 hours of coal fired operation were conducted during the quarter using low sulfur Montana Rosebud coal. The results of these tests are summarized. Operational aspects of the particulate control devices being evaluated, a dry electrostatic precipitator (ESP) and a reverse air baghouse, are discussed. A sootblowing control system for the convective heat transfer surfaces that senses the need to clean the tubes by temperatures is described. Environmental reporting includes measurement of levels of ground water wells over time and the remote air quality measurements of impact of the stack emissions from the two tests. Results of testing candidate ceramic tubes for a recuperative high temperature air heater are included. Analyses of the tube materials tested in the 2000 hour test series previously completed on high sulfur Illinois No. 6 coal are summarized. Facility maintenance and repair activities for the DOE Coal Fired Flow Facility are summarized. The major facility modification discussed is the completion of the installation of a Wet ESP with rotary vacuum filter which is replacing the venturi scrubber as the primary facility particulate control device for any exhaust gases that are not routed through the dry ESP or baghouse.

  8. MHD Integrated Topping Cycle Project. Fourteenth quarterly technical progress report, November 1, 1990-- January 31, 1991

    SciTech Connect

    Not Available

    1992-02-01

    This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was the installation of 1A4-style coupons in the 1A1 channel. A description of the coupons and their location with 1A1 channel is presented herein.

  9. Hungry Horse Dam Fisheries Mitigation; Kokanee Stocking and Monitoring in Flathead Lake, 1996 Progress Report.

    SciTech Connect

    Carty, Daniel; Knoetek, W. Ladd Hansen, Barry

    1997-06-01

    Kokanee salmon Oncorhynchus nerka were introduced into Flathead Lake in 1916. The kokanee population declined in the 1960s and 1970s, and kokanee disappeared from Flathead Lake in the late 1980s. Their disappearance has been attributed to the long-term effects of the construction and operation of Hungry Horse and Kerr dams, excessive harvest by anglers, and changes in the lake food web induced by the introduction of opossum shrimp Mysis relicta. Attempts to reestablish kokanee in the Flathead Lake ecosystem between 1988 and 1991 were unsuccessful. In 1991, Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) wrote a mitigation plan to restore kokanee to Flathead Lake. In 1993, MFWP, CSKT, and the U.S. Fish and Wildlife Service wrote a mitigation implementation plan that initiated a 5-year test program to use hatchery-reared fish to reintroduce kokanee to the lake. Stocking hatchery-reared kokanee into Flathead Lake began in 1993; the 5-year {open_quotes}kokanee test{close_quotes} started in 1994 and is scheduled to continue through 1998. The annual stocking objective is 1 million yearling kokanee (6-8 in long). Criteria used to evaluate the success of the 5-year test are (1) 30% survival of kokanee 1 year after stocking, (2) yearling-to-adult survival of 10%, and (3) annual harvest of 50,000 kokanee ({ge} 11 in) and fishing effort {ge} 100,000 angler hours.

  10. Colorado School of Mines Low Energy Nuclear Physics Project technical progress report

    SciTech Connect

    Cecil, F.E.

    1990-01-05

    This report summarizes the activity and accomplishments of the Colorado School of Mines Low Energy Nuclear Physics project during the calendar year 1989. Many of the projects which were anticipated in the original grant proposal have been completed. Among these completed projects we include of study of the radiative capture of low energy protons on {sup 6}Li, {sup 7}Li, {sup 9}Be, and {sup 11}B. Preliminary measurements of the branching ratios and yields of these reactions were reported in last year's Technical Progress Report. These measurements are now complete and have been used to extract the respective astrophysical S-factors and the corresponding thermonuclear reactivities. While not complete, progress has been made in some of the other originally proposed studies. Among these include a fairly extensive study of the interaction of low energy deuterons with {sup 6}Li and {sup 7}Li. In the course of this study we have made a solid observation of the Oppenheimer-Phillips effect in the D-{sup 6}Li system. Progress has been made in our study of the radiative capture of alpha particles by deuterons, {sup 6}Li, and {sup 7}Li but considerable work remains in these studies. In our earlier reports we noted the observation of d-d reactions during the bombardment of deuterated targets with energetic beams of protons, alpha particles, and other light-to-medium ions. We believe we now understand this phenomenon and feel it has some fairly significant consequences both for our studies and for those of other researchers. Our susceptibility to mob hysteria led us to invest a significant effort in cold nuclear fusion, both employing a fairly unique accelerator based approach at CSM and as one of the gamma ray diagnosticians on the Princeton Plasma Physics Laboratory's Cold Fusion Task Force.

  11. Final Technical Progress Report: Development of Low-Cost Suspension Heliostat; December 7, 2011 - December 6, 2012

    SciTech Connect

    Bender, W.

    2013-01-01

    Final technical progress report of SunShot Incubator Solaflect Energy. The project succeeded in demonstrating that the Solaflect Suspension Heliostat design is viable for large-scale CSP installations. Canting accuracy is acceptable and is continually improving as Solaflect improves its understanding of this design. Cost reduction initiatives were successful, and there are still many opportunities for further development and further cost reduction.

  12. The Development of Middle School Passage Reading Fluency Measures for Use in a Progress Monitoring Assessment System. Technical Report # 46

    ERIC Educational Resources Information Center

    Alonzo, Julie; Park, Bitnara J.; Tindal, Gerald

    2008-01-01

    This technical report describes the development of progress monitoring measures in the area of Reading Comprehension. Measures were developed for grades 6 through 8. Twenty alternate forms of each measure were created. Passages were written by graduate students and reviewed by the lead author, as well as teachers and panels of graduate students.…

  13. Project LIFE--Language Improvement to Facilitate Education. (Technical Progress Report; Third Quarter; March 1, 1974-May 31, 1974).

    ERIC Educational Resources Information Center

    National Foundation for the Improvement of Education, Washington, DC.

    Reported is the third quarter, fiscal year 1974 (March 1, 1974-May 31, 1974) technical progress of Project LIFE (Language Improvement to Facilitate Education), toward developing an instructional system in which filmstrips in the areas of perceptual training, perceptual thinking, and language/reading are used to assist hearing impaired children in…

  14. Generation and focusing of pulsed intense ion beams. Technical progress report, 20 August 1981-30 September 1982

    SciTech Connect

    Hammer, D.A.; Kusse, B.R.; Sudan, R.N.

    1983-07-01

    The progress on this contract is described in two parts. The first deals with the technical operation of the LION accelerator which is the exact equivalent to one line of PBFA-I. The second part is concerned with the experimental results on the ion diode mounted at the front end of the LION accelerator.

  15. The Development of Word and Passage Reading Fluency Measures for Use in a Progress Monitoring Assessment System. Technical Report # 40

    ERIC Educational Resources Information Center

    Alonzo, Julie; Tindal, Gerald

    2007-01-01

    In this technical report, the authors describe the development alternate forms of Word and Passage Reading Fluency measures as part of a comprehensive progress monitoring literacy assessment system developed in 2006 for use with students in Kindergarten through fourth grade. They begin with a brief overview of the two conceptual frameworks…

  16. [Chemical risk in operating rooms and technical progress: the obligations and responsibilities of law].

    PubMed

    Oddo, Antonio

    2013-01-01

    We are going to consider the specific applications of the new legal system and of the most recent body of laws to those work environments of particular risk, such as healthcare facilities and in particular operating rooms. In such environments, volatile chemicals classified as "dangerous" are used with consequent exposure to "chemical risk", both of those persons professionally involved, depending on the type of activity, and of the patients to whom such activities are addressed in the same environment. Once the chemical risk is framed in the existing regulatory system, it must be specifically evaluated the application of the same principle to the particular chemical risk arising from the use of anesthetic agents in the operating room, for example sevoflurane and desflurane, being careful to test wether and how much this risk can be eliminated or reduced to minimum in relation to the new achievements of the technical progress. So, as soon as the quality of "dangerous chemical agent" of the "volatile chemicals" and of the "volatile liquid anesthetic" (sevoflurane and desflurane) as well--which are characterized by a lower degree of toxicity and for this reason are mostly used in current chemical practice, preferable to some anesthetic gases such as nitrous oxide--is legally verified, it is necessary to relate the scientific and technical data which result from the current "state of art" also to the other binding regulations that are imposed for the "prevention and protection from chemical agents", according to the relative Title IX of the TUSL (Unique text for Safety and Health at Work).

  17. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1--March 31, 1993

    SciTech Connect

    Not Available

    1993-09-01

    This quarterly technical progress report presents progress on several different projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Pilot Program; Plasma Furnace Projects for waste destruction; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project for removal of radioactive materials; and Spray Casting Project.

  18. OTEC support services. Quarterly technical progress report No. 19, November 15, 1982-February 14, 1983

    SciTech Connect

    Not Available

    1983-03-01

    Activities relative to accomplishments and to meetings, conferences, etc. are reported in the areas of: OTEC commercialization support, program technical engineering and instrumentation analysis, technical and management services, OTEC systems integration, and transmission subsystem considerations. (LEW)

  19. Advanced Coal Conversion Process Demonstration Project. Technical progress report, January 1, 1993--December 31, 1993

    SciTech Connect

    1995-02-01

    This report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project from January 1, 1993, through December 31, 1993. This project demonstrates an advanced, thermal, coal drying process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low- rank coals to a high-quality, low-sulfur fuel, registered as the SynCoal{reg_sign} process. The coal is processed through three stages (two heating stages followed by an inert cooling stage) of vibrating fluidized bed reactors that remove chemically bound water, carboxyl groups, and volatile sulfur compounds. After thermal processing, the coal is put through a deep-bed stratifier cleaning process to separate the pyrite-rich ash from the coal. Rosebud SynCoal Partnership`s ACCP Demonstration Facility entered Phase III, Demonstration Operation, in April 1992 and operated in an extended startup mode through August 10, 1993, when the facility became commercial. Rosebud SynCoal Partnership instituted an aggressive program to overcome startup obstacles and now focuses on supplying product coal to customers. Significant accomplishments in the history of the SynCoal{reg_sign} process development are shown in Appendix A.

  20. EDS coal liquefaction process development: Phase V. Quarterly technical progress report, January 1-March 31, 1984

    SciTech Connect

    1984-07-01

    This report is the twenty-first Quarterly Technical Progress Report for US Department of Energy Cooperative Agreement No. DE-FC05-77ET10069 for EDS Coal Liquefaction Process Development Phase V. A detailed comparison of RCLU, CLPP, and ECLP yields has been initiated. This study builds off previous yield modeling results, which found that RCLU, CLPP, and ECLP yields were generally consistent given the scatter of the data, although some differences were noted. These pilot unit yield differences have now been quantified, and operating/configurational differences which account for some of them have been identified. Preliminary yield comparison results after correcting for these known process differences between the pilot plants indicate that: RCLU and CLPP yields are generally consistent; ECLP's conversion is about 5 lb/100 lb DAF coal lower than RCLU/CLPP at comparable operating conditions; and work has been initiated to define the EDS slurry preheater feed system design (based on slurry distributor manifold guidelines and coking correlation predictions, which influence furnace pass control issues such as slurry flow measurement). EDS hydrotreated naphtha showed a low level of systemic toxicity to rats exposed to the vapor six hours per day, five days per week for thirteen weeks.

  1. MHD Integrated Topping Cycle Project. Sixteenth quarterly technical progress report, May 1991--July 1991

    SciTech Connect

    Not Available

    1992-03-01

    The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990`s, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

  2. Tidd PFBC Demonstration Project fourth quarterly technical progress report, CY 1992

    SciTech Connect

    Not Available

    1993-01-01

    This is the 23rd technical progress report submitted to the Department of Energy in connection with the cooperative agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period from October 1, 1992 to December 31, 1992. Major activities during this period involve: (1) The unit was operated for a total of 714 hours (including gas turbine air prewarming). There were seven gas turbine starts, seven bed preheater starts, and seven operating periods with coal fire. The peak gross output of 64 MWH was achieved for the period of 1000 to 1100 hours on November 23, 1992. The longest coal fire was 285 hours beginning at 1211 hours on November 25, 1992. (2) Total gross generation was 24,643, and coal consumption was 11,900 tons. (3) The hot gas clean up system was commissioned. (4) Active end fluidization system to address sparge duct cracking and deformation problem was jointly initiated by ABB carbon, B&W and AEPSC. (5) All testing continued using Plum Run dolomite. This approach was taken as a conservative means to avoid sintering and unit trips which were encountered during the previous two start-ups in September using limestone and (6) monitoring of solid, liquid and gaseous waste streams, as detailed in the operations phase monitoring requirements in the EMP, were performed.

  3. Heterogeneous kinetics of coal gasification. Quarterly technical progress report, 1 April 1983-30 June 1983

    SciTech Connect

    Calo, J.M.; Ganapathi, R.

    1983-01-01

    In the current quarterly technical progress report we present data and results on transient kinetic studies of the steam-char reaction system for activated coconut and lignite chars. These experiments were conducted in a fashion similar to the previous char-CO/sub 2/ studies, under approximately the same experimental conditions. The two principal product species, H/sub 2/ and CO, were monitored using the automatic mass programming system developed especially for this project. In order to perform the steam-char experiments, the original apparatus was modified by the addition of a steam generation/condensate removal system. The steam-char reaction system, being somewhat more complex than the CO/sub 2/-char reaction system, was modeled with a six-parameter, elementary kinetic scheme. The ''effective'' active site concentrations determined from the steam gasification data were of the same order of magnitude, and behaved in a similar fashion, to those obtained for the CO/sub 2/ gasification studies. The implications of this result are briefly discussed. 21 refs., 23 figs., 2 tabs.

  4. Environmentally conscious manufacturing & technology access project: Final technical progress report, April 1, 1994--September 30, 1996

    SciTech Connect

    1997-05-01

    This final report is being submitted in fulfillment of the management obligations associated with the TRP/DOE grant which funded the Environmentally Conscious Manufacturing & Technology Access (ECM) Project. A {open_quotes}Federal Assistance Project Status Report{close_quotes} is also being submitted with this form. This report will elaborate on the successful completion of this project in achieving and in most cases exceeding its programmatic goals and fulfilling it statutory financial match obligation. A review of the Year 1 {open_quotes}Technical Progress Report{close_quotes} and the Quarterly Reports filed during the project period, clearly portray that, in all substantive areas, the Environmentally Conscious Manufacturing & Technology Access Project (ECM Project) achieved or exceeded its goals. The success of the Project is largely due to the tremendous support provided by the Center for Technology Transfer (CTT) and the Maine Metal Products Association (MMPA). Both organizations provided extensive administrative and financial support and were instrumental in promoting the work of the project within the metals industry. The programmatic oversight provided by the industry Steering Committee and the broad partnership represented on the Board of Advisors were invaluable in developing, promoting and implementing the work of the ECM Project.

  5. Pipeline gas demonstration plant, Phase I. Quarterly technical progress report for June 1980-August 1980

    SciTech Connect

    Eby, R.J.

    1980-09-01

    Work was performed in the following tasks in Phase I of the Pipeline Gas Demonstration Plant Program: Demonstration Plant Process Design; Site Evaluation and Selection; Demonstration Plant Environmental Analysis; Feedstock Plans, Licenses, Permits and Easements; Demonstration Plant Definitive Design; Economic Reassessment; Technical Support; Long Lead Procurement List; and Project Management. The following Major Contract Deliverables were submitted to the Government: Process Evaluation Report - TIC Version; Conceptual Commercial Plant Design Report - TIC Version; Demonstration Plant Design Analysis Report - TIC Version; Demonstration Plant Process Design Report; Site Master Plan; and Prevention of Significant Deterioration Documentation. The major work activity has been the effort in Demonstration Plant Definitive Design which commenced following the completion of the Process Design Baseline Packages for the fourteen Demonstration Plant process areas. Task VIII, Economic Reassessment was opened in this quarter. Completion of the TIC copies of the ICGG major deliverables constituted a significant effort in this period. Work has progressed satisfactorily in the other Tasks in support of the Demonstration Plant Program.

  6. Rawlins UCG Demonstration Project. Final technical progress report, January 1, 1987--February 9, 1988

    SciTech Connect

    Not Available

    1988-08-03

    Department of Energy Participation in the Rawlins UCG Demonstration Project began officially on November 9, 1987. Even though their financial participation began at this time, they will receive technical information from the start of the project which was on January 1, 1987. The Rawlins UCG Demonstration Project is progressing in Phase I with the majority of the emphasis on facility design, site characterization and the environmental work. The site characterization field work is estimated to be completed by the end of February with the final report completion towards the end of Phase I. The facility design effort is close to the 40% level. It is anticipated that all permits will be applied for in Phase I and most of them will be granted by the end of Phase I. The obtaining of the private financing continues to be a major activity in the project. All of the financing must be in place before the continuation for DOE funding to Phase II will be applied for.

  7. Establishment of an Institute for Fusion Studies. Technical progress report, November 1, 1991--October 31, 1992

    SciTech Connect

    Hazeltine, R.D.

    1992-07-01

    The Institute for Fusion Studies is a national center for theoretical fusion plasma physics research. Its purposes are: (1) to conduct research on theoretical questions concerning the achievement of controlled fusion energy by means of magnetic confinement--including both fundamental problems of long-range significance, as well as shorter-term issues; (2) to serve as a center for information exchange, nationally and internationally, by hosting exchange visits, conferences, and workshops; (3) and to train students and postdoctoral research personnel for the fusion energy program and plasma physics research areas. The theoretical research results that are obtained by the Institute contribute mainly to the progress of national and international efforts in nuclear fusion research, whose goal is the development of fusion power.as a basic energy source. In addition to its primary focus on fusion physics, the Institute is also involved with research in related fields, such as advanced computing techniques, nonlinear dynamics, plasma astrophysics, and accelerator physics. The work of EFS scientists continued to receive national and international recognition. Numerous invited papers were given during the past year at workshops, conferences, and scientific meetings. Last year IFS scientists published 95 scientific articles in technical journals and monographs.

  8. TIDD PFBC Demonstration Project: Third quarterly technical progress report 1992, CY 1992

    SciTech Connect

    Not Available

    1992-10-01

    This is the 22nd Technical Progress Report submitted to the Department of Energy in connection with the Cooperative Agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period from July 1, 1992 to September 30, 1992. The unit was operated for a total of 903 hours (including gas turbine air prewarming). There were 9 gas turbine starts, 11 preheating starts, and 8 operating periods with coal fire. The peak gross output of 59 MWH was achieved for the period of 1600 to 1700 hours on September 23, 1992. The longest coal fire was 422 hourb beginning at 1349 hours on August 9, 1992. Total gross generation was 32,418 MWH, and coal consumption was 15,846 tons. Testing was completed on the gas turbine blade resonance frequency problem. The report showed that a resonant frequency problem existing at high LPT speeds and at a mostly closed guide vane position. An operating curve was developed by ABBC to avoid the points of blade resonance. Monitoring of solid, liquid and gaseous waste streams, as detailed in the operations phase monitoring requirements in the EMP, were performed throughout the quarter.

  9. Coal liquefaction process streams characterization and evaluation. Quarterly technical progress report, July 1--September 30, 1993

    SciTech Connect

    Robbins, G.A.; Brandes, S.D.; Winschel, R.A.; Burke, F.P.

    1994-03-01

    This is the Sixteenth Quarterly Technical Progress Report under DOE Contract DE-AC22-89PC89883. Major topics reported are: Fifty-eight process samples from HRI CTSL Bench Unit Run CC-15 (227-75) were analyzed to provide information on process performance. Run CC-15 was operated for 14 periods (days) from October 21 through November 3, 1992 in the thermal/catalytic configuration with Black Thunder Mine (Wyodak and Anderson seams) coal and Shell S-317 Ni/Mo supported extrudate catalyst. The run was made to test performance with and without a dispersed hydrous iron hydroxide catalyst precursor impregnated in the coal. Results are compared with those of previous HRI CTSL bench unit Run CC-1, which was operated in the catalytic/catalytic configuration, also with Shell S-317 catalyst. Several HRI Run CC-15 product distillate fractions prepared by the National Institute for Petroleum and Energy Research (NIPER) for petroleum inspection tests were further characterized by CONSOL. These characterization data are presented. MicroAutoclave tests and chemical analyses were performed to evaluate the solvent quality of two potential solvents for Alberta Research Council ARC. Eight product samples from catalytic dehydrogenation experiments were characterized for the University of Pittsburgh. A description is presented of the thermogravimetric analysis (TGA) method for determination of resid concentration/resid conversion, which was adapted for use in-house from HRI`s standard method. A brief summary of the status of the Participants Program is given.

  10. PFBC HGCU Test Facility. Second quarterly technical progress report, CY 1993

    SciTech Connect

    Not Available

    1993-07-01

    This is the fifteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd Pressurized Fluidized Bed Combustion (PFBC) Hot Gas Clean Up Test Facility. This report covers the period of work completed during the Second Quarter of CY 1993.Work accomplished during the reporting period includes: the expansion joint heaters and control system were installed and tested. The system consists of 8 bellows heaters and 14 heaters on the adjacent piping. During initial testing, 11 of the 14 pipe and heaters failed due to overheating caused by control and installation problems; A pneumatically powered vibrator was installed in the APF manway nozzle to vibrate the hopper liner during back pulsing. This should eliminate any build-up on the pipes of the hopper; Two half capacity diesel driven back-up pulse air compressors were rented and installed; Installation of an emergency ash removal system was completed. The system enables ash to be removed via a line connected to the pipe between the outlet of the screw cooler and the inlet of the lockhopper system; Installation of the spoiling air line, valves, and metering orifice to the primary cyclone was completed; Numerous revisions were made to the Net 90 instrumentation and control system and the POPS data trending system to enhance system control and performance monitoring capability.

  11. Advanced Coal Conversion Process Demonstration Project. Quarterly technical progress report, January 1, 1994--March 31, 1994

    SciTech Connect

    1996-02-01

    This report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project from January 1, 1994, through March 31, 1994. This project demonstrates an advanced, thermal, coal drying process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to a high-quality, low-sulfur fuel, registered as the SynCoal{reg_sign} process. The coal is processed through three stages (two heating stages followed by an inert cooling stage) of vibrating fluidized bed reactors that remove chemically bound water, carboxyl groups, and volatile sulfur compounds. After thermal processing, the coal is put through a deep-bed stratifier cleaning process to separate the pyrite-rich ash from the coal. Rosebud SynCoal Partnership`s ACCP Demonstration Facility entered Phase III, Demonstration Operation, in April 1992 and operated in an extended startup mode through August 10, 1993, when the facility became commercial. Rosebud SynCoal Partnership instituted an aggressive program to overcome startup obstacles and now focuses on supplying product coal to customers. Significant accomplishments in the history of the SynCoal{reg_sign} process development are shown in Appendix A.

  12. TIDD PFBC Demonstration Project. First quarterly technical progress report, CY 1993

    SciTech Connect

    Not Available

    1993-04-01

    This is the 24th Technical Progress Report submitted in connection with the cooperative agreement between the DOE and the Ohio Power Company for the Tidd Pressurized Fluidized Bed Combustion (PFBC) Demonstration Plant. This report covers the period from January 1, 1993 to March 31, 1993. The following activities are reported: The unit was operated for a total of 331 hours (including gas turbine air prewarming). There were three gas turbine starts, five bed preheater starts, and two operating periods with coal fire. The peak gross output of 61 MWH was achieved for the period of 2200 to 2300 hours on January 20, 1993. The longest coal fire was 273 hours beginning at 0605 hours on January 20, 1993; total gross generation was 13,453 MWH, and coal consumption was 6,481 tons; The sorbent fines injection system was installed and is ready for use; A totally new secondary ash removal system was designed; New sparge ducts are being fabricated to replace the existing ducts; The plant was found to be in compliance with applicable Ohio regulation after an EPA inspection; and The unit has been out of service since early February due to the failure of the gas turbine. Replacement parts are being fabricated

  13. The Magnetohydrodynamics Coal-Fired Flow Facility technical progress report, July 1, 1993--September 30, 1993

    SciTech Connect

    Not Available

    1993-12-01

    In this quarterly technical progress report, UTSI reports on a multi-task research contract directed toward developing the technology for an MHD steam combined cycle power plant. During the period two tests were conducted in the DOE Coal Fired FLow Facility. Both of these tests were part of the western coal proof-of-concept (POC) test series. The report describes the performance of the tests and provides some preliminary performance data on particulate removal systems during the tests. The performance of ceramic tubes being tested for high temperature air heater application is described. Performance of advanced diagnostics equipment from both UTSI and MSU is summarized. The results of experiments designed to determine the effects of potassium compounds on combustion are included. Plans for analysis of metal tube specimens previously removed from the test train are discussed. Modeling and analysis of previous test data include a deposition model to predict ash deposition on tubes, mass balance results, automated data screening and chemical analyses and the data base containing these analyses. Laboratory tests on sealing ceramic tubes and corrosion analyses of previously tested tubes are reported.

  14. Pulsed atmospheric fluidized bed combustion. Technical progress report, July 1991--September 1991

    SciTech Connect

    Not Available

    1991-10-01

    The major accomplishments during this reporting period include completion of Task 1 and progression into Phase II, Task 2 design activities. A brief laboratory-scale test was conducted during this reporting period to confirm heat transfer coefficients for various sections of the Pulsed Atmospheric Fluidized bed Combustion (PAFBC) system. The heat transfer coefficient was determined to be approximately 50 Btu/hr ft{sup 2} {degrees}F inside the eductor and tailpipe of the pulse combustor as thin the fluidized bed. well as for the surfaces immersed within the fluidized bed. Communications with potential host sites for the Phase III field demonstration activities continued during this reporting period. These discussions along with discussions with environmental regulatory personnel in the State of Maryland indicate that the throughput of the field demonstration facility should be increased to greater than 36 million Btu/hr. An 8 in. {times} 8 in. fluidized bed unit would be too small to satisfy this requirement; its projected firing rate is only 33 million Btu/hr. Major effort during this reporting period was devoted to assessing the reasonableness of increasing the size of the field test facility from a technical and cost standpoint.

  15. Soot formation in synthetic-fuel droplets. Second quarterly technical progress report

    SciTech Connect

    England, G.; Kramlich, J.; Payne, R.

    1981-04-01

    The main objective of this program is to provide detailed information on methods of minimizing soot formation during synthetic liquid fuel combustion under conditions which minimize the formation of nitric oxides. The program comprises two main tasks, Fuel Screening Studies, and Flame Studies. The purpose of the first task is to investigate the impact of fuel properties on particulate production, to establish the importance of droplet size and examine atomizer effects, and to develop techniques for surrogate fuels production. In the second task, fundamental details of soot formation from synfuel droplet combustion will be investigated in variable slip velocity configurations. This report describes technical progress during the second three-month period of program effort (January-March 1981). During this period attention has continued to be focussed on the design, construction and commissioning of experimental systems. The Task 1 tunnel furnace modification was completed and made operational, and some preliminary fuel screening studies were carried out. Similarly, construction of the controlled flow droplet reactor was completed and efforts directed towards the design and testing of diagnostic systems. Details of this work are discussed.

  16. EDS coal liquefaction process development. Phase V. Quarterly technical progress report, July 1-September 30, 1980

    SciTech Connect

    1981-02-01

    This report is the tenth Quarterly Technical Progress Report for US Department of Energy Cooperative Agreement No. DE-FC01-77ET10069 (formerly EF-77-A-01-2893) for Exxon Donor Solvent (EDS) Coal Liquefaction Process Development - Phase V. The Laboratory Process Research and Development studies were conducted at various Exxon Research and Engineering Co. (ER and E) facilities: Research and Development Division at Baytown, Texas; Products Research Division at Linden, New Jersey; and the Exxon Research and Development Laboratories at Baton Rouge, Louisiana. The Engineering Research and Development studies were performed at the Synthetic Fuels Engineering and Exxon Engineering Technology Departments of ER and E at Florham Park, New Jersey. The information dealing with the Management, Detailed Engineering, and Procurement activities related to revamp of the FLEXICOKING Prototype Unit was generated at Exxon Company, USA, Houston, Texas, and Exxon Engineering - Project Management Department of ER and E, Florham Park, New Jersey. The information dealing with operation of the 250 T/D Exxon Coal Liquefaction Pilot Plant (ECLP) was generated at Exxon Company, USA, Houston, Texas.

  17. Coal liquefaction process streams characterization and evaluation. Quarterly technical progress report, January 1--March 31, 1992

    SciTech Connect

    Robbins, G.A.; Brandes, S.D.; Winschel, R.A.; Burke, F.P.

    1992-08-01

    This is the tenth Quarterly Technical Progress Report under DOE Contract DE-AC22-89PC89883. Process oils from Wilsonville Run 262 were analyzed to provide information on process performance. Run 262 was operated from July 10 through September 30, 1991, in the thermal/catalytic Close-Coupled Integrated Two-Stage Liquefaction (CC-ITSL) configuration with ash recycle. The feed coal was Black Thunder Mine subbituminous coal. The high/low temperature sequence was used. Each reactor was operated at 50% of the available reactor volume. The interstage separator was in use throughout the run. The second-stage reactor was charged with aged Criterion 324 catalyst (Ni/Mo on 1/16 inch alumina extrudate support). Slurry catalysts and sulfiding agent were fed to the first-stage reactor. Molyvan L is an organometallic compound which contains 8.1% Mo, and is commercially available as an oil-soluble lubricant additive. It was used in Run 262 as a dispersed hydrogenation catalyst precursor, primarily to alleviate deposition problems which plagued past runs with Black Thunder coal. One test was made with little supported catalyst in the second stage. The role of phenolic groups in donor solvent properties was examined. In this study, four samples from direct liquefaction process oils were subjected to O-methylation of the phenolic groups, followed by chemical analysis and solvent quality testing.

  18. PFBC HGCU Test Facility. Second quarterly technical progress report, CY 1992

    SciTech Connect

    Not Available

    1992-07-01

    This is the eleventh technical progress report submitted to the Department of Energy (DOE) in connection with the Cooperative Agreement between DOE and Ohio Power company for the Tidd Pressurized Fluidized Bed Combustion (PFBC) Hot Gas Clean Up Test Facility. This report covers the period of work completed during the Second Quarter of CY 1992. Activities included: The Tidd combustor internals were modified to connect the hot gas system for slipstream operation; Various pre-operational activities were completed, including pneumatic leak testing of the HGCU system, operation of the closed cycle cooling water system, operation of the back pulse compressor and air preheater, and checkout of the back pulse skid. Initial operation of the system using the bypass cyclone occurred during May 21--23, 1992; On May 23, 1992, an expansion joint ruptured, forcing the unit to be shut down. The failure was later determined to be due to stress corrosion. Following the expansion joint failure, a complete engineering review of the system was undertaken and is continuing; Contract Modification No. 6 was issued to Westinghouse during this quarter. This modification is for APF surveillance testing services; A purchase order was issued to Battelle for ash sampling hardware and testing services.

  19. Tidd PFBC Demonstration Project fourth quarterly technical progress report, CY 1992

    SciTech Connect

    Not Available

    1993-01-01

    This is the 23rd technical progress report submitted to the Department of Energy in connection with the cooperative agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period from October 1, 1992 to December 31, 1992. Major activities during this period involve: (1) The unit was operated for a total of 714 hours (including gas turbine air prewarming). There were seven gas turbine starts, seven bed preheater starts, and seven operating periods with coal fire. The peak gross output of 64 MWH was achieved for the period of 1000 to 1100 hours on November 23, 1992. The longest coal fire was 285 hours beginning at 1211 hours on November 25, 1992. (2) Total gross generation was 24,643, and coal consumption was 11,900 tons. (3) The hot gas clean up system was commissioned. (4) Active end fluidization system to address sparge duct cracking and deformation problem was jointly initiated by ABB carbon, B W and AEPSC. (5) All testing continued using Plum Run dolomite. This approach was taken as a conservative means to avoid sintering and unit trips which were encountered during the previous two start-ups in September using limestone and (6) monitoring of solid, liquid and gaseous waste streams, as detailed in the operations phase monitoring requirements in the EMP, were performed.

  20. Coal liquefaction process streams characterization and evaluation. Quarterly technical progress report, April 1--June 30, 1992

    SciTech Connect

    Brandes, S.D.; Lancet, M.S.; Robbins, G.A.; Winschel, R.A.; Burke, F.P.

    1992-11-01

    This is the eleventh Quarterly Technical Progress Report under DOE Contract DE-AC22-89PC89883. Major topics reported are: (1) The results of a study designed to determine the effects of the conditions employed at the Wilsonville slurry preheater vessel on coal conversion is described. (2) Stable carbon isotope ratios were determined and used to source the carbon of three product samples from Period 49 of UOP bench-scale coprocessing Run 37. The results from this coprocessing run agree with the general trends observed in other coprocessing runs that we have studied. (3) Microautoclave tests and chemical analyses were performed to ``calibrate`` the reactivity of the standard coal used for determining donor solvent quality of process oils in this contract. (4) Several aspects of Wilsonville Close-Coupled Integrated Two-Stage Liquefaction (CC-ITSL) resid conversion kinetics were investigated; results are presented. Error limits associated with calculations of deactivation rate constants previously reported for Runs 258 and 261 are revised and discussed. A new procedure is described that relates the conversions of 850{degrees}F{sup +} , 1050{degrees}F{sup +}, and 850 {times} 1050{degrees}F material. Resid conversions and kinetic constants previously reported for Run 260 were incorrect; corrected data and discussion are found in Appendix I of this report.

  1. Jointly sponsored research program quarterly technical progress report, January--March 1994

    SciTech Connect

    Not Available

    1994-08-01

    Progress reports are presented for the following tasks: Development and demonstration of a practical electric downhole steam generator for thermal recovery of heavy oil and tar; wetting behavior of selected crude oil/brine/rock systems; coal gasification, power generation, and product market study; impact of leachate from clean coal technology waste on the stability of clay liners; investigation of coprocessing of heavy oil, automobile shredder residue, and coal; injection into coal seams for simultaneous CO{sub 2} mitigation and enhanced recovery of coalbed methane; optimization of carbonizer operations in the FMC coke process; chemical sensor and field screening technology development; demonstration of the Koppelman ``Series C`` Power River Basin coal as feed; remote chemical sensor development; market assessment and technical feasibility study of PFBC ash use; solid-state NMR analysis and interpretation of naturally and artificially matured kerogens; Crow{trademark} field demonstration with Bell Lumber and Pole; ``B`` series pilot plant tests; and in-situ treatment of manufactured gas plant contaminated soils demonstration program.

  2. PFBC HGCU Test Facility. Technical progress report No. 24, Third quarter, CY 1995

    SciTech Connect

    1995-10-01

    This is the twenty-fourth and final Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the work completed during the Third Quarter of CY 1995. All activity this quarter was directed toward the completion of the program final report. A draft copy of the final report was forwarded to DOE during this quarter, and DOE submitted their comments on the report to AEPSC. DOE requested that Westinghouse write an appendix to the report covering the performance of the fail-safe regenerator devices during Tad operation, and Westinghouse subsequently prepared the appendix. Additional DOE comments were incorporated into the report, and it will be issued in camera-ready form by the end of October, 1995, which is the program end date. Appendix 1 presents the results of filter candle posttest examination by Westinghouse performed on selected filter candles following final shutdown of the system.

  3. PFBC HGCU Test Facility. Fourth quarterly technical progress report, CY 1992

    SciTech Connect

    Not Available

    1993-01-01

    This is the thirteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the period of work completed during the Fourth Quarter of CY 1992. The following are highlights of the activities that occurred during this report period: Initial operation of the Advanced Particle Filter (APF) occurred during this quarter. The following table summarizes the operating dates and times. HGCU ash lockhopper valve plugged with ash. Primary cyclone ash pluggage. Problems with the coal water paste. Unit restarted warm 13 hours later. HGCU expansion joint No. 7 leak in internal ply of bellows. Problems encountered during these initial tests included hot spots on the APP, backup cyclone and instrumentation spools, two breakdowns of the backpulse air compressor, pluggage of the APF hopper and ash removal system, failure (breakage) of 21 filter candles, leakage of the inner ply of one (1) expansion joint bellows, and numerous other smaller problems. These operating problems are discussed in detail in a subsequent section of this report. Following shutdown and equipment inspection in December, design modifications were initiated to correct the problems noted above. The system is scheduled to resume operation in March, 1993.

  4. PFBC HGCU Test Facility technical progress report second quarter, CY 1994

    SciTech Connect

    Mudd, M.J.

    1994-07-01

    This is the nineteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. During this quarter, the Tidd Hot Gas Clean Up System operated for 444 continuous hours (including 15 hours at the end of the first quarter) during Test Run 18. The system was shut down on April 18, 1994, and remained out of service for the remainder of the quarter. Highlights of this period are summarized below: operated HGCU for 444 continuous hours which was the longest run so far in 1994; completed Hazardous Air Pollutant testing; inspected Advanced Particle Filter (APF) following testing and found 28 broken filter candles; cleaned and reassembled the APF without the inner rows of candles in the upper and middle plenums since ash bridging between these candles and the center support pipe caused the candle failures; installed 30 new filter candles of different materials for testing in the APF; and installed additional air piping and valves to permit the primary cyclone to be totally spoiled in service and thereby direct all of the ash into the filter.

  5. Jointly sponsored research program. Quarterly technical progress report, October--December 1993

    SciTech Connect

    Deans, H.A.

    1994-05-01

    This is a progress report on work performed by Western Research Institute for the U.S. DOE, Morgantown Energy Technology Center in the period October- December 1993. Tasks addressed include: development and demonstration of a practical electric downhole steam generator for thermal recovery of heavy oil and tar; wetting behavior of selected crude oil/brine/rock systems; coal gasification, power generation, and product market study; the impact of leachate from clean coal technology waste on the stability of clay liners; investigation of coprocessing of heavy oil, automobile shredder residue, and coal; injection into coal seams for simultaneous CO{sub 2} mitigation and enhanced recovery of coalbed methane; optimization of carbonizer operations in the FMC coke process; chemical sensor and field screening technology development; demonstration of the koppelman {open_quotes}series c{close_quotes} process using a batch test unit with Powder River Basin coal as feed; remote chemical sensor development; market assessment and technical feasibility study of PFBC ash use; solid-state NMR analysis and interpretation of naturally and artificially matured kerogens; Crow{trademark} field demonstration with bell lumber and pole; {open_quotes}B{close_quotes} series pilot plant tests; in situ treatment of manufactured gas plant contaminated soils demonstration program.

  6. MHD air heater development technology. Technical progress report, April 1, 1980-June 30, 1980

    SciTech Connect

    1980-07-01

    Technology development for the directly-fired high temperature air heater (HTAH) for MHD power plants is described. Work is being done under three tasks as described in the following. (1) materials selection, evaluation, and development: The objective of this task is to continue development of ceramic materials technology for the directly-fired HTAH. The scope of the work will include compilation of materials data, materials selection for testing and design studies, materials property determination, liaison with refractory manufacturers and other organizations to encourage development of materials and fabrication technology, establishment of preliminary HTAH material specifications, analyses of test materials, and development of criteria for thermal stress limits for crack-tolerant refractory materials. (2) operability, performance, and materials testing: The objectives of this task are to demonstrate the technical feasibility of operating a directly-fired HTAH (including both the heater matrix and valves), to continue obtaining information on life and corrosion resistance of HTAH materials, and to obtain design information for full-scale studies and future design work. (3) full-scale design concepts: The objectives of this task are to begin the identification of HTAH control requirements and control system needs, and to continue full-scale study efforts incorporating updated materials and design information in order to identify development needs for the HTAH development program. Progress is described. (WHK)

  7. Technical progress report for the magnetohydrodynamics coal-fired flow facility for the period April 1, 1994--June 30, 1994

    SciTech Connect

    Not Available

    1994-07-01

    In this quarterly technical progress report, UTSI reports on the status of a multitask contract to develop the technology for the steam bottoming portion of a MHD Steam Combined Cycle Power Plant. The report describes the facility maintenance and environmental work completed, status of completing technical reports and certain key administrative actions occurring during the quarter. In view of current year budget reductions and program reductions to closeout the MHD program, downsizing of the UTSI work force took place. No further testing occurred or was scheduled during the quarter, but the DOE CFFF facility was maintained in a standby status.

  8. Technical progress report for the Magnetohydrodynamics Coal-Fired Flow Facility, January 1, 1994--March 31, 1994

    SciTech Connect

    Not Available

    1994-06-01

    In this quarterly technical progress report, UTSI reports on the status of a multi-task contract to develop the technology for the steam bottoming portion of a MHD Steam Combined Cycle Power Plant. The report describes the facility maintenance and environmental work completed, status of completing technical reports and certain key administrative actions occurring during the quarter. In view of current year budget reductions and program reductions to closeout the MHD program, downsizing of the UTSI work force took place. No further testing has occurred or is scheduled, and the planned effort for this period was to maintain the DOE CFFF facility in a standby status and to complete test reports.

  9. Progress towards design elements for a Great Lakes-wide aquatic invasive species early detection network

    EPA Science Inventory

    Great Lakes coastal systems are vulnerable to introduction of a wide variety of non-indigenous species (NIS), and the desire to effectively respond to future invaders is prompting efforts towards establishing a broad early-detection network. Such a network requires statistically...

  10. Cle Elum Lake Sockeye Salmon Restoration Feasibility Study, 1986-1988 Progress Report.

    SciTech Connect

    Flagg, Thomas A.

    1988-10-01

    In 1986, a multi-year project to evaluate the biological feasibility of reestablishing anadromous sockeye salmon (Oncorhynchus nerka) runs to Cle Elum Lake in the Yakima River Basin was established between the Bonneville Power Administration (BPA) and the National Marine Fisheries Service (NMFS). This program involves the capture, spawning, and rearing of disease-free donor stock in 1987 and 1988 and assessment of juvenile outmigration and survival from Cle Elum Lake in 1989 and 1990. Work in 1987--1988 involved collection of adult sockeye salmon from the Lake Wenatchee run and incubation and rearing of progeny as donor stock. In July 1987, 263 adults were captured at the Dryden fishway on the Wenatchee River and transferred to net-pens in Lake Wenatchee. Adults were held approximately 90 days and spawned, and the eggs were transferred to a quarantine hatchery. Pre-spawning survival was 95.1%, and all spawners were certified as being free of Infectious Hematopoietic Necrosis (IHN) and other replicating viruses. Egg viability averaged about 40%; however, eyed egg to hatch survival was over 99%. Juveniles are being reared in quarantine, and survival to date is about 92%. The NMFS currently has over 131,000 fry (0.7 g average weight) in culture. Fry have been certified twice (at 0.12 g and 0.25 g average weight) as being free of IHN and other replicating viruses. Viral certification will continue throughout rearing. 13 refs., 4 figs., 3 tabs.

  11. Coastal wetland support of Great Lakes fisheries: progress from concept to quantification.

    EPA Science Inventory

    Fishery support is recognized as a valuable ecosystem service provided by aquatic systems but is harder to quantify than to describe conceptually. In this paper, we intersect data on fish inhabiting Great Lakes coastal wetlands with information on commercial and recreational har...

  12. Cle Elum Lake Sockeye Salmon Restoration Feasibility Study, 1987-1989 Progress Report.

    SciTech Connect

    Flagg, Thomas A.

    1990-02-01

    This report summarizes research activities conducted by the National Marine Fisheries Service (NMFS) from July 1988 through March 1989 relating to the Cle Elum Lake sockeye salmon restoration feasibility study. During this period, efforts focused on collection and spawning of adult sockeye salmon from the Wenatchee River, incubation of eggs from the 1988-brood, and the rearing of juveniles from the 1987-brood. In late July and early August 1988, 520 adult sockeye salmon were captured at fishways on the Wenatchee River and transferred to net-pens in Lake Wenatchee. Fish were held to maturity in late September and early October, spawned, and eggs incubated at a quarantine hatchery in Seattle, WA. The 336 sockeye salmon successfully spawned from the net-pens at Lake Wenatchee were surveyed for the presence of infectious hematopoietic necrosis (IHN) and other replicating viruses. In addition, 13 and 5 sockeye salmon spawners were surveyed from spawning grounds on the White and Little Wenatchee Rivers, respectively, from within the Lake Wenatchee system. 12 refs., 4 figs., 6 tabs.

  13. Coastal wetland support of Great Lakes fisheries: progress from concept to quantification.

    EPA Science Inventory

    Fishery support is recognized as a valuable ecosystem service provided by aquatic systems but is harder to quantify than to describe conceptually. In this paper, we intersect data on fish inhabiting Great Lakes coastal wetlands with information on commercial and recreational har...

  14. Progress towards design elements for a Great Lakes-wide aquatic invasive species early detection network

    EPA Science Inventory

    Great Lakes coastal systems are vulnerable to introduction of a wide variety of non-indigenous species (NIS), and the desire to effectively respond to future invaders is prompting efforts towards establishing a broad early-detection network. Such a network requires statistically...

  15. Progress towards an AIS early detection monitoring network for the Great Lakes

    EPA Science Inventory

    As an invasion prone location, the lower St. Louis River system (SLR) has been a case study for ongoing research to develop the framework for a practical Great Lakes monitoring network for early detection of aquatic invasive species (AIS). Early detection, however, necessitates f...

  16. The Mark Twain Lake/Salt River CEAP Project – Progress and Preliminary Findings

    USDA-ARS?s Scientific Manuscript database

    The Mark Twain Lake collects drainage from approximately 6600 km2 of the Salt River basin, most of which represents the Midwest claypan major land resource area. Thus, it is likely the watershed most prone to surface runoff in the CEAP benchmark network. High surface runoff from agricultural land wi...

  17. Progress towards an AIS early detection monitoring network for the Great Lakes

    EPA Science Inventory

    As an invasion prone location, the lower St. Louis River system (SLR) has been a case study for ongoing research to develop the framework for a practical Great Lakes monitoring network for early detection of aquatic invasive species (AIS). Early detection, however, necessitates f...

  18. The limnological status of Lake Mead and Lake Mohave under present and future powerplant operations of Hoover Dam. Technical report no. 1 (final)

    SciTech Connect

    Paulson, L.J.; Baker, J.R.; Deacon, J.E.

    1980-01-01

    The U.S. Bureau of Reclamation is considering several alternatives for modifying Hoover Dam existing hydroelectric facilities, or add new facilities in the Lake Mead Recreation Area to increase peak-power output. This report deals with the investigations conducted on both Lake Mead and Mohave to assess the impacts of power modifications on the limnology of the reservoirs. Physical, chemical, biological and nutrients were measured in the Colorado River at Pierce Ferry and below Hoover Dam and in Las Vegas.

  19. [Advanced Coal Conversion Process Demonstration Project]. Technical progress report: April 1, 1992--June 30, 1992

    SciTech Connect

    Not Available

    1993-10-01

    This report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project from April 1, 1992, through June 30, 1992. This project demonstrates an advanced thermal coal drying process coupled with physical cleaning techniques designed to upgrade high-moisture, low-rank coals into a high-quality, low-sulfur fuel, registered as the SynCoal{reg_sign} process. The coal is processed through three stages (two heating stages followed by an inert cooling stage) of vibrating fluidized bed reactors that remove chemically bound water, carboxyl groups, and volatile sulfur compounds. After drying, the coal is put through a deep-bed stratifier cleaning process to separate the pyrite-rich ash from the coal. The SynCoal{reg_sign} process enhances low-rank, western coals, usually with a moisture content of 25 to 55 percent, sulfur content of 0.5 to 1.5 percent, and heating value of 5,500 to 9,000 British thermal units per pound (Btu/Ib), by producing a stable, upgraded coal product with a moisture content as low as 1 percent, sulfur content as low as 0.3 percent, and heating value up to 12,000 Btu/lb. The 45-ton-per-hour unit is located adjacent to a unit train loadout facility at Western Energy Company`s Rosebud coal mine near Colstrip, Montana. The demonstration plant is sized at about one-tenth the projected throughput of a multiple processing train commercial facility. The demonstration drying and cooling equipment is currently near commercial size.

  20. Methyl chloride via oxyhydrochlorination of methane. Quarterly technical progress report No. 13, October--December 1994

    SciTech Connect

    1995-02-01

    The purpose of this contract is to develop a process for converting light alkane gases to methyl chloride via oxyhydrochlorination using highly selective, stable catalysts in fixed-bed reactors designed to remove the large amount of heat generated, so as to control the reaction temperature. Further, the objective is to obtain the engineering data base necessary for developing a commercially feasible process and to evaluate t economics of the process. Significant progress was made in six different technical areas during this quarter. These key highlights are: (1) Evaluation of catalyst samples from UCI led to the ordering of the OHC PDU catalyst batch. This catalyst batch arrived, was screened and found to be defective, and was reordered. (2) Natural gas containing higher hydrocarbons was used as a methane source. The reactant mixture formed oxygenates at temperatures lower than observed in the past. Burning at such low temperatures seems to create a product stream containing very little CH{sub 2}Cl{sub 2}. (3) Although it has not been decided if the PDU will use natural gas from the plant or methane or natural gas from cylinders as a methane feed source, it was concluded that an adsorption unit to remove sulfur and higher hydrocarbons is not necessary at this time. (4) PDU construction was completed in December. The bulk of insulation work was completed at the end of November. Much effort has been put into pressure testing the PDU`s systems. The startup team has become adept at finding and correcting such leaks. (5) SOP writing for the PDU was completed this quarter with communication with the software programmer to insure agreement between the software and SOP.

  1. Power systems development facility. Quarterly technical progress report, July 1--September 30, 1993

    SciTech Connect

    Not Available

    1993-12-31

    This quarterly technical progress report summarizes work completed during the Second Quarter of the Second Budget Period, July 1 through September 30, 1993, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scaleup of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. Hot Gas Cleanup Units to mate to all gas streams; Combustion Gas Turbine; and Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility.

  2. Sudbury Neutrino Observatory. Annual technical progress report, July 1, 1991--June 30, 1992

    SciTech Connect

    Beier, E.W.

    1992-03-01

    This document is a technical progress report on work performed at the University of Pennsylvania during the current year on the Sudbury Neutrino Observatory project. The motivation for the experiment is the measurement of neutrinos emitted by the sun. The Sudbury Neutrino Observatory (SNO) is a second generation dedicated solar neutrino experiment which will extend the results of our work with the Kamiokande II detector by measuring three reactions of neutrinos rather than the single reaction measured by the Kamiokande experiment. The collaborative project includes physicists from Canada, the United Kingdom, and the United States. Full funding for the construction of this facility was obtained in January 1990, and its construction is estimated to take five years. The motivation for the SNO experiment is to study the fundamental properties of neutrinos, in particular the mass and mixing parameters, which remain undetermined after decades of experiments in neutrino physics utilizing accelerators and reactors as sources of neutrinos. To continue the study of neutrino properties it is necessary to use the sun as a neutrino source. The long distance to the sun makes the search for neutrino mass sensitive to much smaller mass than can be studied with terrestrial sources. Furthermore, the matter density in the sun is sufficiently large to enhance the effects of small mixing between electron neutrinos and mu or tau neutrinos. This experiment, when combined with the results of the radiochemical {sup 37}Cl and {sup 71}Ga experiments and the Kamiokande II experiment, should extend our knowledge of these fundamental particles, and as a byproduct, improve our understanding of energy generation in the sun.

  3. NO decomposition in non-reducing atmospheres. Technical progress report, June--August 1996

    SciTech Connect

    Klier, K.; Herman, R.G.; Dedecek, J.

    1996-09-01

    In the last quarterly technical progress report, it was shown that adsorption of Co and ethylene onto 0.2 wt% Co(II) ion exchanged erionite, with Si/Al molar ratio of 3.6, after dehydration at 350 C significantly altered the optical spectrum of the zeolite. It was also found that the paramagnetic moment of Co(II) in erionite (8 wt% Co(II)) dehydrated at 525 C was higher than that obtained after dehydration to only 350 C. Therefore, adsorption studies have been carried out with the Co(II) erionite samples after dehydration at the higher temperature of 525 C. It was found that adsorption of CO and ethylene onto 0.2 to 6--8 wt% Co(II) erionite zeolites significantly altered the optical spectra of the samples. The band at approximately 24,500 cm{sup {minus}1} that is characteristic of bare Co(II) cations in six-ring window in zeolites disappeared upon adsorption of CO and ethylene, indicating that the Co(II) ions were accessible and underwent complexation by these reductant molecules. At the same time, the intensities of the spectra arising from the complexed Co(II) cations were more intense than those of the dehydration Co(II) centers. Therefore, there is no evidence that Co(II) was reduced by these weak ligands. The siting and accessibility of the Co(II) cations is expected to influence the activity of zeolite catalysts for the selective catalytic reduction of NO by different reductants.

  4. Instrumentation of dynamic gas pulse loading system. Technical progress report, first quarter 1992

    SciTech Connect

    Mohaupt, H.

    1992-04-14

    The overall goal of this work is to further develop and field test a system of stimulating oil and gas wells, which increases the effective radius of the well bore so that more oil can flow into it, by recording pressure during the gas generation phase in real time so that fractures can be induced more predictably in the producing formation. Task 1: Complete the laboratory studies currently underway with the prototype model of the instrumentation currently being studied. Task 2: Perform field tests of the model in the Taft/Bakersfield area, utilizing operations closest to the engineers working on the project, and optimize the unit for various conditions encountered there. Task 3: Perform field test of the model in DGPL jobs which are scheduled in the mid-continent area, and optimize the unit for downhole conditions encountered there. Task 4: Analyze and summarize the results achieved during the complete test series, documenting the steps for usage of downhole instrumentation in the field, and compile data specifying use of the technology by others. Task 5: Prepare final report for DOE, and include also a report on the field tests completed. Describe and estimate the probability of the technology being commercialized and in what time span. The project has made substantial technical progress, though we are running about a month behind schedule. Expenditures are in line with the schedule. Increased widespread interest in the use of DGPL stimulation has kept us very busy. The computer modeling and test instrumentation developed under this program is already being applied to commercial operations.

  5. PFBC HGCU test facility technical progress report. First Quarter, CY 1994

    SciTech Connect

    Not Available

    1994-04-01

    This is the eighteenth Technical Progress Report submitted in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. During this quarter, the Tidd Hot Gas Clean Up System operated for 835 hours during six separate test runs. The system was starting into a seventh run at the end of the quarter. Highlights of this period are summarized below: the longest run during the quarter was approximately 333 hours; filter pressure drop was stable during all test runs this quarter using spoiling air to the primary cyclone upstream of the Advanced Particle Filter (APF); the tempering air system was commissioned this quarter which enabled the unit to operate at full load conditions while limiting the gas temperature in the APF to 1,400 F; during a portion of the one run, the tempering air was removed and the filter operated without problems up to 1,450 F; ash sampling was performed by Battelle personnel upstream and downstream of the APF and ash loading and particle size distribution data were obtained, a summary report is included; a hot area on the APF head was successfully repaired in service; a hot spot on the top of an expansion joint was successfully repaired by drilling holes from the inside of the pipe and pumping in refractory insulation; a corrosion inspection program for the HGCU system was issued giving recommendations for points to inspect; filter internal inspections following test runs 13 and 17 revealed a light coating (up to 1/4 inch thick) of residual ash on the candles and some ash bridging between the dust sheds and inner rows of candles. Data from these inspections are included with this report.

  6. Advanced Coal Conversion Process Demonstration Project. Final technical progress report, January 1, 1995--December 31, 1995

    SciTech Connect

    1997-05-01

    This report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project from January 1, 1995 through December 31, 1995. This project demonstrates an advanced, thermal, coal upgrading process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to a high-quality, low-sulfur fuel, registered as the SynCoal Process. The coal is processed through three stages (two heating stages followed by an inert cooling stage) of vibrating fluidized bed reactors that remove chemically bound water, carboxyl groups, and volatile sulfur compounds. After thermal upgrading, the coal is put through a deep-bed stratifier cleaning process to separate the pyrite-rich ash from the coal. The SynCoal Process enhances low-rank, western coals, usually with a moisture content of 25 to 55 percent, sulfur content of 0.5 to 1.5 percent, and heating value of 5,5000 to 9,000 British thermal units per pound (Btu/lb), by producing a stable, upgraded, coal product with a moisture content as low as 1 percent, sulfur content as low as 0.3 percent, and heating value up to 12,000 Btu/lb. During this reporting period, the primary focus for the ACCP Demonstration Project team was to expand SynCoal market awareness and acceptability for both the products and the technology. The ACCP Project team continued to focus on improving the operation, developing commercial markets, and improving the SynCoal products as well as the product`s acceptance.

  7. OTEC support services. Quarterly technical progress report No. 7, 15 November 1979-14 February 1980

    SciTech Connect

    1980-02-01

    The technical engineering and management support services provided by VSE corporation for the Ocean Thermal Energy Conversion Program of the Ocean Systems Branch, Division of Central Solar Technology during this quarter are described. The seven tasks include (1) survey, analysis evaluation, and recommendation concerning program performance, (2) program technical monitoring, (3) development and implementation of methodology to identify and evaluate program alternatives, (4) technical assessments, (5) OTEC system integration, (6) environment and siting considerations; and (7) transmission subsystem considerations. (WHK)

  8. OTEC support services. Quarterly technical progress report No. 8, February 15-May 14, 1980

    SciTech Connect

    Lipari, M. V.

    1980-05-01

    Technical engineering and management support services provided by the VSE Corporation for the Ocean Thermal Energy Conversion Program of the Ocean Systems Branch, Division of Central Solar Technology are reported. Tasks include: (1) survey, analysis, evaluation, and recommendation concerning program performance; (2) program technical monitoring; (3) development and implementation of methodology to identify and evaluate program alternatives; (4) technical assessments; (5) OTEC system integration; (6) environment and siting considerations; and (7) transmission subsystem considerations. (WHK)

  9. High temperature packing test program. First quarterly technical progress report, October 1-December 26, 1981

    SciTech Connect

    Not Available

    1982-02-12

    The program was undertaken to improve the technical understanding of the performance of plunger packings in coal liquefaction pilot plant feed pumps. During the first quarter of FY 1982, visits were made to the H-Coal, EDS and SRC-I pilot plants, where technical discussions were held with maintenance and engineering personnel, and the maintenance records and work orders for the plunger pumps were reviewed. Technical discussions were held with engineering personnel at the manufacturing facilities of three plunger pump manufacturers' companies. Contracts and technical discussions with packing vendors were initiated. Design of the laboratory tests was started.

  10. Evaluation of an Experimental Re-introduction of Sockeye Salmon into Skaha Lake; Year 1 of 3, 2000 Technical Report.

    SciTech Connect

    Hammell, Larry; Machin, Deanna; Long, Karilyn

    2001-06-01

    Historical records indicate that sockeye salmon were once found in most of the lakes in the Okanagan River Basin. Currently, the only sockeye population within the Okanagan River Basin is found in Osoyoos Lake. Abundance of this stock has declined significantly in the last fifty years. The Okanagan Nation and tribes in the U.S. have proposed re-introducing the species into Okanagan Lake, which has a large rearing capacity. However, assessing the potential benefits and risks associated with a reintroduction of sockeye salmon into Okanagan Lake is difficult because of uncertainties about factors that determine production of Okanagan sockeye, and potential interactions with other species in Okanagan Lake. Associated with this proposal are the potential risks of re-introduction of sockeye salmon into Okanagan Lake. One of these is the effects of sockeye on the resident Okanagan Lake kokanee population, which has declined significantly in the past several years because of habitat loss due to human encroachment, competition with introduced mysid shrimp, and the reduction of biological productivity in the lake as municipalities have moved to more complete effluent treatment. Another concern is the possibility of the transmission of diseases that are currently not found in Okanagan and Skaha lakes from re-introduced sockeye to resident fish. An additional concern is the risk that exotic species (e.g. tench, largemouth bass), that have become established in southern Okanagan Lakes (principally as a result of purposeful introductions in the US Columbia/Okanagan river system), may be able to extend their range to Skaha and Okanagan Lakes, through fish ladders provided at the outlets of Vaseaux (McIntyre Dam) and Skaha Lakes (Okanagan Falls Dam), for natural upstream migration of sockeye. A transboundary multi-agency workshop was hosted in November of 1997 to discuss the potential risks and benefits of reintroducing sockeye salmon into Okanagan Lake. These discussions were

  11. Cle Elum Lake Restoration Feasibility Study: Fish Husbandry Research, 1988-1991 Progress Report.

    SciTech Connect

    Flagg, Thomas A.

    1991-09-01

    The National Marine Fisheries Service (NMFS) and the Bonneville Power Administration (BPA) are involved in a project to evaluate the feasibility of re-establishing anadromous salmon runs to Cle Elum Lake in the Yakima River Basin of Washington state. Historically, the Yakima River system supported large runs of anadromous salmonids that contributed significantly to the Columbia River harvest. Habitat destruction and overfishing drastically reduced run abundance prior to the early 1900s. Salmon runs were eliminated from upper reaches of the Yakima River Basin with development of irrigation storage reservoirs without fishways in the early 1900s. The goal of the NMFS/BPA project is to determine if it is feasible for anadromous salmonids to recolonize the habitat above Cle Elum Dam under the present format of irrigation water withdrawal from the reservoir. The primary concern is whether anadromous fish can successfully exit Cle Elum Lake and survive downstream passage through the Yakima and Columbia Rivers to the ocean.

  12. OTEC support services. Quarterly technical progress report No. 20, 15 February - 14 May 1983

    SciTech Connect

    Not Available

    1983-01-01

    The following task areas are described briefly for the system integration, system engineering, and management services provided for the OTEC program: (1) survey, analysis and evaluation; (2) program technical monitoring; (3) development and implementation of methodology; (4) technical assessment; (5) OTEC systems integration; (6) environment and siting considerations; and (7) transmission subsystem considerations.

  13. Vocational-Technical Education Consortium of States. Second Progress and Information Report.

    ERIC Educational Resources Information Center

    Hirst, Ben A., Jr.

    The report is designed to provide the reader with a basic understanding of the processes and procedures used to develop catalogs of performance objectives, criterion-referenced measures, and performance guides for learners in vocational-technical education. It reports on the efforts of the Vocational-Technical Education Consortium of States…

  14. Moses Lake Fishery Restoration Project; Factors Affecting the Recreational Fishery in Moses Lake Washington, Annual Report 2002-2003.

    SciTech Connect

    Burgess, Dave

    2003-11-01

    This annual report is a precursor to the final technical report we will be writing the next contract period. Consequently, this report, covering the period between September 27, 2002, and September 26, 2003, represents a progress report towards the final technical report we anticipate completing by September 26, 2004. Sample analysis and field work have progressed well and we anticipate no further delays. There are 4 objectives: (1) To quantify secondary production Moses Lake; (2) To quantify the influence of predation on target fishes in Moses Lake; (3) To quantify mortality of selected fished in Moses Lake; and (4) To assess effects of habitat changes from shoreline development and carp on the fish community in Moses Lake.

  15. Hydrogen production by supercritical water gasification of biomass. Phase 1 -- Technical and business feasibility study, technical progress report

    SciTech Connect

    1997-12-01

    The nine-month Phase 1 feasibility study was directed toward the application of supercritical water gasification (SCWG) for the economical production and end use of hydrogen from renewable energy sources such as sewage sludge, pulp waste, agricultural wastes, and ultimately the combustible portion of municipal solid waste. Unique in comparison to other gasifier systems, the properties of supercritical water (SCW) are ideal for processing biowastes with high moisture content or contain toxic or hazardous contaminants. During Phase I, an end-to-end SCWG system was evaluated. A range of process options was initially considered for each of the key subsystems. This was followed by tests of sewage sludge feed preparation, pumping and gasification in the SCW pilot plant facility. Based on the initial process review and successful pilot-scale testing, engineering evaluations were performed that defined a baseline system for the production, storage and end use of hydrogen. The results compare favorably with alternative biomass gasifiers currently being developed. The results were then discussed with regional wastewater treatment facility operators to gain their perspective on the proposed commercial SCWG systems and to help define the potential market. Finally, the technical and business plans were developed based on perceived market needs and the projected capital and operating costs of SCWG units. The result is a three-year plan for further development, culminating in a follow-on demonstration test of a 5 MT/day system at a local wastewater treatment plant.

  16. Learning Progressions: Tools for Assessment and Instruction for All Learners. Technical Report #1307

    ERIC Educational Resources Information Center

    Sáez, Leilani; Lai, Cheng-Fei; Tindal, Gerald

    2013-01-01

    Conceptually, learning progressions hold promise for improving assessment and instruction by precisely outlining what students know and don't know at particular stages of knowledge and skill development. Based upon a synthesis of the literature, a rationale for the use of learning progressions maps to clarify how learning progresses in English…

  17. Proceedings of the technical review on advances in geothermal reservoir technology---Research in progress

    SciTech Connect

    Lippmann, M.J.

    1988-09-01

    This proceedings contains 20 technical papers and abstracts describing most of the research activities funded by the Department of Energy (DOE's) Geothermal Reservoir Technology Program, which is under the management of Marshall Reed. The meeting was organized in response to several requests made by geothermal industry representatives who wanted to learn more about technical details of the projects supported by the DOE program. Also, this gives them an opportunity to personally discuss research topics with colleagues in the national laboratories and universities.

  18. 2016 Lake Michigan Lake Trout Working Group Report

    USGS Publications Warehouse

    Madenjian, Charles P.; Breidert, Brian; Boyarski, David; Bronte, Charles R.; Dickinson, Ben; Donner, Kevin; Ebener, Mark P.; Gordon, Roger; Hanson, Dale; Holey, Mark; Janssen, John; Jonas, Jory; Kornis, Matthew; Olsen, Erik; Robillard, Steve; Treska, Ted; Weldon, Barry; Wright, Greg D.

    2017-01-01

    This report provides a review on the progression of lake trout rehabilitation towards meeting the Salmonine Fish Community Objectives (FCOs) for Lake Michigan (Eshenroder et. al. 1995) and the interim goal and evaluation objectives articulated in A Fisheries Management Implementation Strategy for the Rehabilitation of Lake Trout in Lake Michigan (Dexter et al. 2011); we also include data describing lake trout stocking and mortality to portray the present state of progress towards lake trout rehabilitation.

  19. The Impact of the Adequate Yearly Progress Requirement of the Federal "No Child Left Behind" Act on Schools in the Great Lakes Region. Executive Summary

    ERIC Educational Resources Information Center

    Wiley, Edward W.; Mathis, William J.; Garcia, David R.

    2005-01-01

    This executive summary describes a study that finds nearly every school in the Great Lakes states is threatened to fail the Adequate Yearly Progress (AYP) requirements mandated by the federal "No Child Left Behind" (NCLB) Act. NCLB holds schools and districts accountable for student achievement on state standardized tests and schools…

  20. The Impact of the Adequate Yearly Progress Requirement of the Federal "No Child Left Behind" Act on Schools in the Great Lakes Region

    ERIC Educational Resources Information Center

    Wiley, Edward W.; Mathis, William J.; Garcia, David R.

    2005-01-01

    This study finds that nearly every school in the Great Lakes states is threatened to fail the Adequate Yearly Progress (AYP) requirements mandated by the federal "No Child Left Behind" (NCLB) Act. NCLB holds schools and districts accountable for student achievement on state standardized tests and schools that do not make AYP face…

  1. An Investigation of the Mechanism of IGA/SCC of Alloy 500 in Corrosion Accelerating Heated Crevice Environments. Technical progress report

    SciTech Connect

    Lumsden, Jesse

    2000-03-01

    OAK-B135 An Investigation of the Mechanism of IGA/SCC of Alloy 500 in Corrosion Accelerating Heated Crevice Environments. Technical progress report Note: This report was submitted electronically even though Part II A indicates by ''PAPER''.

  2. Spatial characterization of acid rain stress in Canadian Shield lakes. Progress report, 1 August 1985-1 February 1986

    SciTech Connect

    Tanis, F.J.

    1986-01-01

    The acidification of lake waters from airborne pollutants is of continental proportions both in North America and Europe. A major concern of the acid rain problem is the cumulative ecosystem damage to lakes and forest. The number of lakes affected in northeastern United States and on the Canadian Shield is though to be enormous. The principle objective is to examine how seasonal changes in lake water transparency are related to annual acidic load. Further, the relationship between variations in lake acidification and ecophysical units is being examined. Finally, the utility of Thematic Mapper (TM) based observations to measure seasonal changes in the optical transparency in acid lakes is being investigated.

  3. Savannah River Ecology Laboratory, Annual Technical Progress Report of Ecological Research, June 30, 2002

    SciTech Connect

    Paul M. Bertsch,

    2002-06-30

    The Savannah River Ecology Laboratory (SREL) is a research unit of The University of Georgia (UGA) and has been conducting ecological research on the Savannah River Site (SRS) near Aiken, South Carolina for 50 years. The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts fundamental and applied ecological research, as well as education and outreach programs, under a Cooperative Agreement with the U.S. Department of Energy (DOE). The Laboratory's research mission during the 2002 fiscal year was fulfilled with the publication of 76 journal articles and book chapters by faculty, technical staff, students, and visiting scientists. An additional 50 journal articles have been submitted or are in press. Other noteworthy events took place as faculty members, staff, and graduate students received awards. These are described in the section titled Special Accomplishments of Faculty, Staff, Students, and Administration on page 51. Notable scientific accomplishments include work conducted on contaminant transport, stable isotopes, sandhills ecology, and phytoremediation: (1) A collaborative study between Dr. Tom Hinton at SREL and scientists at SRTC demonstrated the feasibility of using illite clay to sequester 137Cs in sediments along the P and R reactor cooling canal system, where approximately 3,000 acres of land are contaminated. Overall, the study showed significant decreases in cesium concentrations and bioavailability following the addition of illite with no sign of harm to the ecosystem. While the cesium remains sequestered from the biosphere, its radioactivity decays and the process progresses from contaminant immobilization to remediation. (2) SREL's stable isotope laboratory is now fully functional. Stable isotope distributions in nature can provide important insights into many historical and current environmental processes. Dr. Christopher Romanek is leading SREL's research in this area

  4. OTEC support services. Quarterly technical progress report No. 9, 15 May-14 August 1980

    SciTech Connect

    1980-08-01

    System integration, system engineering, and management support services provided by the VSE Corporation for the Ocean Thermal Energy Conversion Program of the Ocean Systems Branch, Division of Central Solar Technology, DOE are described. The services are provided under seven task areas: (1) survey, analysis, evaluation, and recommendation concerning program performance; (2) program technical monitoring; (3) development and implementation of methodology to identify and evaluate program alternatives; (4) technical assignments; (5) OTEC system integration; (6) environment and siting considerations; and (7) transmission subsystem considerations. (WHK)

  5. Toms Creek Integrated Gasification Combined Cycle Demonstration Project. Final quarterly technical progress report for the period ending March 31, 1993

    SciTech Connect

    Feher, G.

    1993-05-24

    This Quarterly Technical Progress Report for the period ending March 31, 1993 summarizes the work done to data by Tampella Power Corporation and Enviropower, Inc. on the integrated combined-cycle power plant project. Efforts were concentrated on the Toms Creek PDS (Preliminary Design and Studies). Tampella Power Corporation`s efforts were concentrated on the Toms Creek Preliminary Process Flow Diagram (PFD) and Piping and Instrument Diagrams (P&IDs). Tampella Power Corporation also prepared Heat and Material Balances (H&MBs) for different site-specific cases.

  6. Responsive copolymers for enhanced petroleum recovery. Quarterly technical progress report, June 22, 1993 through September 22, 1993

    SciTech Connect

    McCormick, C.; Hester, R.

    1993-12-01

    This report summarizes technical progress on advanced copolymer synthesis and characterization of the molecular structure of copolymers to be used to enhanced recovery of petroleum. Polymers examined are acrylamide/acrylamido-3-methylbutanoic acid/N-(4-butyl)phenylacrylamide (AM/AMBA/BPAM) terpolymers, sodium 2-(acrylamido)-2-methylpropanesulfonate and (2-(acrylamido)-2-methylpropyl)trimethylammonium chloride (NaAMPS/AMPTAC) copolymers, AM/NaAMPS/AMPTAC terpolymers, and AM/APS (APS is 2-(1-pyrenylsulfonamido) ethyl acrylamide) copolymers. Polymer associative behavior and polymer solution behavior is characterized.

  7. [List and drag forces on droplets and particles in wall-bounded shear flows]. Technical progress report

    SciTech Connect

    McLaughlin, J.B.

    1992-11-01

    This project has two goals, to calculate the lift force on a spherical droplet or particle that translates through a shear flow, and to measure the inertial migration velocity that is caused by the lift force. The focus of the study is on a range of Reynolds numbers that has been shown to be of importance in the inertial deposition of aerosols from turbulent shear flows. Aspects of current technical progress summarized are the asymptotic analysis, computer simulations, and experimental measurements. Future plans and resulting publications are given.

  8. GT-MHR COMMERCIALZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMNET REPORT FOR THE PERIOD JULY 1 THROUGH JULY 31, 2003

    SciTech Connect

    SHENOY, A.S.

    2003-07-01

    A271 GT-MHR COMMERCIALZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMNET REPORT FOR THE PERIOD JULY 1 THROUGH JULY 31, 2003. Petten has completed design of the irradiation test rig for the HFR-EU2 test and has completed design and machining of the H-451 graphite sleeves which will be used to contain the HFR-EU2 fuel compacts. A plan, entitled ''Screening Tests for Selection of VHTR Advanced Fuel,'' has been drafted and has completed internal review. This screening program plan is a major portion of the Development Plan for Advanced High Temperature Coated-Particle currently under preparation.

  9. Index to Nuclear Safety: a technical progress review by chrology, permuted title, and author, Volume 11(1) through Volume 20(6)

    SciTech Connect

    Cottrell, W B; Passiakos, M

    1980-06-01

    This index to Nuclear Safety, a bimonthly technical progress review, covers articles published in Nuclear Safety, Volume II, No. 1 (January-February 1970), through Volume 20, No. 6 (November-December 1979). It is divided into three sections: a chronological list of articles (including abstracts) followed by a permuted-title (KWIC) index and an author index. Nuclear Safety, a bimonthly technical progress review prepared by the Nuclear Safety Information Center (NSIC), covers all safety aspects of nuclear power reactors and associated facilities. Over 600 technical articles published in Nuclear Safety in the last ten years are listed in this index.

  10. Developing Technical Writing Skills in the Physical Chemistry Laboratory: A Progressive Approach Employing Peer Review

    ERIC Educational Resources Information Center

    Gragson, Derek E.; Hagen, John P.

    2010-01-01

    Writing formal "journal-style" lab reports is often one of the requirements chemistry and biochemistry students encounter in the physical chemistry laboratory. Helping students improve their technical writing skills is the primary reason this type of writing is a requirement in the physical chemistry laboratory. Developing these skills is an…

  11. Developing Technical Writing Skills in the Physical Chemistry Laboratory: A Progressive Approach Employing Peer Review

    ERIC Educational Resources Information Center

    Gragson, Derek E.; Hagen, John P.

    2010-01-01

    Writing formal "journal-style" lab reports is often one of the requirements chemistry and biochemistry students encounter in the physical chemistry laboratory. Helping students improve their technical writing skills is the primary reason this type of writing is a requirement in the physical chemistry laboratory. Developing these skills is an…

  12. THE DEVELOPMENT OF ACHIEVEMENT MEASURES FOR TRADE AND TECHNICAL EDUCATION. PROGRESS REPORT NUMBER THREE.

    ERIC Educational Resources Information Center

    BALDWIN, THOMAS S.

    DURING THIS PERIOD FROM SEPTEMBER 1 THROUGH NOVEMBER 30, 1966, 35 FIELD CONSULTANTS COMPLETED ANALYSIS OF THEIR INDIVIDUAL TRADE AND TECHNICAL CURRICULUMS. THESE ANALYSES WERE DEVELOPED INTO AN OUTLINE TO SERVE AS A GUIDE FOR DEVELOPING ACHIEVEMENT TESTS. THE FINAL OUTLINE WAS DIVIDED INTO AS MANY DIFFERENT AREAS AS THE CONSULTANTS FELT NECESSARY…

  13. Technical progress report for the quarter 1 October-31 December 1980

    SciTech Connect

    Not Available

    1981-01-01

    This report describes the technical accomplishments on the commercial nuclear waste management programs and on the geologic disposal of nuclear wastes. The program is organized into eight tasks: systems, waste package, site, repository, regulatory and institutional, test facilities and excavations, land acquisition, and program management. (DLC)

  14. Space Power MHD (magnetohydrodynamic) System: Third quarterly technical progress report, 1 November 1987-31 January 1988

    SciTech Connect

    Not Available

    1988-03-15

    This progress report of the Space Power MHD System project presents the accomplishments during 1 November 1987 through 31 January 1988. The scope of work covered encompasses the definition of an MHD power system conceptual design and development plan (Task 1). Progress included the following: Subcontracts were issued to the MIT Plasma Fusion Center and the Westinghouse R and D Center. The performance of the 100 MW 500 sec. power system was optimized and the design concept finalized, including mass and energy balances. Mass and cost estimates were prepared. A design review was held at DOE/PETC. This also included the review of the technical issues definition and of the R and D Plan. Following the review, a final iteration on the conceptual design was initiated. Formulation of the R and D Plan was continued. Preparation of the Task 1 R and D Report was initiated. 12 figs.

  15. GT-MHR COMMERCIALZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD MAY 1 THROUGH MAY 31, 2003

    SciTech Connect

    SHENOY, A.S.

    2003-05-01

    A271 GT-MHR COMMERCIALZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD MAY 1 THROUGH MAY 31, 2003. Petten advised GA the start of the HFR-EU2 irradiation is being delayed until late July 2004. HFR-EU1 (pebble fuel) is also delayed until February/March 2004. The reason for the delays was implementation of new financial regulations at Petten that delayed the contracts for capsule fabrication. Review of the MHR-2 Fuel Product Specification was completed. Revision of the specification to incorporate the review results is in progress. Detailed test matrices have been drafted for capsule irradiation tests and for post-irradiation heating tests proposed for development and qualification of advanced coated-particle fuels capable of meeting anticipated VHTR fuel performance requirements.

  16. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 5. Technical Report # 09-01

    ERIC Educational Resources Information Center

    Lai, Cheng Fei; Alonzo, Julie; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  17. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Kindergarten. Technical Report # 0921

    ERIC Educational Resources Information Center

    Alonzo, Julie; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in kindergarten. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2008 and administered to approximately 2800 students from…

  18. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 2. Technical Report # 0920

    ERIC Educational Resources Information Center

    Alonzo, Julie; Lai, Cheng Fei; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  19. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 8. Technical Report # 09-04

    ERIC Educational Resources Information Center

    Lai, Cheng Fei; Alonzo, Julie; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  20. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 7. Technical Report 0908

    ERIC Educational Resources Information Center

    Lai, Cheng Fei; Alonzo, Julie; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  1. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 4. Technical Report # 09-03

    ERIC Educational Resources Information Center

    Alonzo, Julie; Lai, Cheng Fei; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  2. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 1. Technical Report # 0919

    ERIC Educational Resources Information Center

    Alonzo, Julie; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grade 1. These measures, available as part of easyCBM [TM], an online progress monitoring assessment system, were developed in 2008 and administered to approximately 2800 students from schools…

  3. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 3. Technical Report # 09-02

    ERIC Educational Resources Information Center

    Alonzo, Julie; Lai, Cheng Fei; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  4. Electrostatic beneficiation of coal. Quarterly technical progress report, July 1, 1996--September 30, 1996

    SciTech Connect

    Mazumder, M.K.; Lindquist, D.; Tennal, K.B.

    1996-11-01

    Progress reports are presented for the following tasks: single particle measurement of size and charge; electrodynamic balance for trapping single particles for measurement; and tribocharging of coal particles passed through a circular tube.

  5. Information and Communications Technical Support Services to the Office of Environment, Safety, and Health. Progress report

    SciTech Connect

    1993-12-01

    Progress is reported on the following tasks: development of safety publications, conference support, planning and reporting, MORT A/I video, print products, special graphics, and SAFE software development.

  6. University of Florida, University research program in robotics. Annual technical progress report

    SciTech Connect

    Crane, C.D. III; Tulenko, J.S.

    1994-05-01

    Progress is reported in the areas of environmental hardening, database, world modeling, vision, man-machine interface, advanced liquid metal reactor inspection robot, and articulated transporter/manipulator system (ATMS) development.

  7. Tunable composite membranes for gas separations. Quarterly technical progress report, May--July 1996

    SciTech Connect

    Ferraris, J.P.; Balkus, K.J. Jr.; Musselman, I.H.

    1996-08-05

    Significant progress has been made in the synthesis and characterization of conducting polymer composite membranes for gas separations. Zeolite/polyalkylthiophene composite membranes have been prepared and characterized for zeolite NaY.

  8. [A clinical trial of neutron capture therapy for brain tumors]. Technical progress report 1988

    SciTech Connect

    Zamenhof, R.G.

    1988-12-31

    This report describes progress made in refining of neutron-induced alpha tract autoradiography, in designing epithermal neutron bean at MITR-II and in planning treatment dosimetry using Monte Carlo techniques.

  9. Amarillo National Resource Center for Plutonium. Quarterly technical progress report, May 1, 1997--July 31, 1997

    SciTech Connect

    1997-09-01

    Progress summaries are provided from the Amarillo National Center for Plutonium. Programs include the plutonium information resource center, environment, public health, and safety, education and training, nuclear and other material studies.

  10. Progress report on the geothermal assessment of the Jordan Valley, Salt Lake County, Utah

    SciTech Connect

    Klauk, R.H.; Darling, R.; Davis, D.A.; Gwynn, J.W.; Murphy, P.J.; Ruscetta, C.A.; Foley, D.

    1981-05-01

    Two known geothermal areas have been investigated previously in the Jordan Valley, Salt Lake County, Utah. These reports indicate meteoric water is being circulated to depth and heated by the ambient temperature derived from normal heat flow. This warm water subsequently migrates upward along permiable fault zones. The gravity survey conducted in the valley indicates a number of fault blocks are present beneath the unconsolidated valley sediments. The faults bounding these blocks could provide conduits for the upward migration of warm water. Four areas of warm water wells, in addition to the two known geothermal areas, have been delineated in the valley. However, the chemistry of the Jordan Valley is quite complex and at this time is not fully understood in regard to geothermal potential. Thick sequences of unconsolidated valley fill could conceal geothermal areas due to lateral dispersion or dilution within the principal aquifer, as well as retardation of warm water flow allowing time for cooling prior to discharge in wells or springs. Other areas are possibly diluted and cooled by high quality, ground water recharge from snow melt in the Wasatch Range.

  11. Lake Winnipeg Basin: Advocacy, challenges and progress for sustainable phosphorus and eutrophication control.

    PubMed

    Ulrich, Andrea E; Malley, Diane F; Watts, Paul D

    2016-01-15

    Intensification of agricultural production worldwide has altered cycles of phosphorus (P) and water. In particular, loading of P on land in fertilizer applications is a global water quality concern. The Lake Winnipeg Basin (LWB) is a major agricultural area displaying extreme eutrophication. We examined the eutrophication problem in the context of the reemerging global concern about future accessibility of phosphate rock for fertilizer production and sustainable phosphorus management. An exploratory action research participatory design was applied to study options for proactivity within the LWB. The multiple methods, including stakeholder interviews and surveys, demonstrate emerging synergies between the goals of reversing eutrophication and promoting food security. Furthermore, shifting the prevalent pollutant-driven eutrophication management paradigm in the basin toward a systemic, holistic and ecocentric approach, integrating global resource challenges, requires a mutual learning process among stakeholders in the basin to act on and adapt to ecosystem vulnerabilities. It is suggested to continue aspects of this research in a transdisciplinary format, i.e., science with society, in response to globally-expanding needs and concerns, with a possible focus on enhanced engagement of indigenous peoples and elders.

  12. Support services for ceramic fiber-ceramic matrix composites. Annual technical progress report

    SciTech Connect

    Hurley, J.P.; Nowok, J.W.

    1996-12-27

    Ceramic and advanced alloy corrosion in fossil energy systems is being investigated. During 1995-6, ash was collected for testing corrosion resistance of materials in air-blown fluidized-bed gasification systems. Descriptions of the activities are presented in this report, which is an extension of a technical paper on testing corrosion rates of ceramics in coal gasification systems. A section of this report covers factors affecting the composition of ash deposits.

  13. Experimental Program Final Technical Progress Report: 15 February 2007 to 30 September 2012

    SciTech Connect

    Kinney, Edward R.

    2014-09-12

    This is the final technical report of the grant DE-FG02-04ER41301 to the University of Colorado at Boulder entitled "Intermediate Energy Nuclear Physics" and describes the results of our funded activities during the period 15 February 2007 to 30 September 2012. These activities were primarily carried out at Fermilab, RHIC, and the German lab DESY. Significant advances in these experiments were carried out by members of the Colorado group and are described in detail.

  14. High SO(2) removal efficiency testing. Technical progress report, March - May 1996

    SciTech Connect

    Murphy, J.; Blythe, G.

    1996-12-31

    This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company`s Big Bend Station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. The remainder of this document is divided into four sections. Section 2, project summary, provides a brief overview of the status of technical efforts on this project. Section 3, results, summarizes the outcome from technical efforts during the quarter or results from prior quarters that have not been previously reported. In Section 4, plans for the next reporting period, an overview is provided of the technical efforts anticipated for the first quarter of calendar year 1996. Section 5 contains a brief acknowledgment.

  15. High SO{sub 2} removal efficiency testing. Technical progress report, October--December 1995

    SciTech Connect

    Blythe, G.

    1995-10-18

    This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. Following the introduction, this report is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from technical efforts during the quarter, or results from prior quarter that have not been previously reported. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts anticipated for the first quarter of calendar year 1996. Section 5 contains a brief acknowledgment.

  16. Great Basin paleoenvironmental studies project; Third quarterly technical progress report, December 1993--February 1994

    SciTech Connect

    1994-04-01

    Examination of the paleolithic and geomorphic records to determine the local and regional impact of past climates will advance assessment of Yucca Mountain`s suitability as a high-level nuclear waste repository. The project includes the integration of botanical, faunal, and geomorphic components to accomplish this goal. Paleobotanical studies will reconstruct the response of vegetation to climate change at the community and the organismal levels by integrating data obtained from nearly continuous sediment records of pollen, plant macrofossils, and stable isotopes from fossil woodrat middens. The goal of the paleofaunas study is to construct a history of Great Basin vertebrates, particularly mammals, that will provide empirical evidence of past environmental and climatic conditions within the Great Basin as it is recorded by the animals. Taxonomic composition of archaeological and paleontological faunas from various areas within the Great Basin and morphological change within individual mammalian taxa at specific localities are being investigated to monitor faunal response to changing environmental conditions. The objective of the geomorphology component of the paleoenvironmental program is to document the responses of surficial processes and landforms to the climatic changes documented by studies of packrat middens, pollen, and faunal distributions. The project will focus on: (1) stratigraphic relationships between lake deposits and aeolian or fluvial sediments and landforms; (2) cut and fill sequences in floodplain and river-channel deposits; (3) identification of periods of dune mobility and stability; (4) documentation of episodes of alluvial fan and terrace development and erosion; and (5) correlation of (3) and (4) to climatically driven lake-level fluctuation as revealed by shoreline features such as strandlines and beach ridges. Accomplishments for this period are presented for these studies.

  17. Robotic weld overlay coatings for erosion control. Quarterly technical progress report, April 1993--June 1993

    SciTech Connect

    Levin, B.F.; Dupont, J.N.; Marder, A.R.

    1993-07-20

    Twelve weld overlay hardfacing alloys have been selected for preliminary erosion testing based upon a literature review. Four of the selected coatings were deposited on a 1018 steel substrate using plasma arc welding process. During the past quarter, the remaining eight coatings were deposited in the same manner. Ten samples from each coatings were prepared for erosion testing. Microstructural characterization of each coating is in progress. This progress report describes coating deposition and sample preparation procedures. Relation between coatings hardness and formation of cracks in coatings is discussed.

  18. Amarillo National Resource Center for Plutonium. Quarterly technical progress report, November 1, 1997--January 31, 1998

    SciTech Connect

    1998-03-01

    This report provides information on projects conducted by the Amarillo National Resource Center for Plutonium, a consortium of Texas A&M University, Texas Tech University, and the University of Texas. Progress is reported for four major areas: (1) plutonium information resource; (2) environmental, safety, and health; (3) communication, education, training, and community involvement; and (4) nuclear and other material studies. Environmental, safety, and health projects reported include a number of studies on high explosives. Progress reported for nuclear material studies includes storage and waste disposal investigations.

  19. Advanced liquefaction using coal swelling and catalyst dispersion techniques. Quarterly technical progress report, January--March 1993

    SciTech Connect

    Curtis, C.W.; Gutterman, C.; Chander, S.

    1993-09-01

    The overall objective of this project is to develop a new approach for the direct liquefaction of coal to produce an all-distillate product slate at a sizable cost reduction over current technology. The approach integrates coal selection, pretreatment, coal swelling with catalyst impregnation, liquefaction, product recovery with characterization, alternate bottoms processing, and carrying out a technical assessment including an economic evaluation. The primary coal of this program, Black Thunder subbituminous coal, can be effectively beneficiated to about 4 wt% ash using aqueous sulfurous acid pretreatment. This treated coal can be further beneficiated to about 2 wt% ash using commercially available procedures. All three coals used in this study (Black Thunder, Burning Star bituminous, and Martin Lake lignite) are effectively swelled by a number of solvents. The most effective solvents are those having hetero-functionality. In addition, a synergistic effect has been demonstrated, in which solvent blends are more effective for coal swelling than the pure solvents alone. Therefore, it will be necessary to use only low levels of swelling agents and yet promote the impregnation of catalyst precursors. The rate of the impregnation of catalyst precursors into swollen coal increases greatly as the effectiveness of the solvent to swell the coal increases.

  20. Advanced liquefaction using coal swelling and catalyst dispersion techniques. Quarterly technical progress report No. 7, April 1993--June 1993

    SciTech Connect

    Curtis, C.W.; Chander, S.; Gutterman, C.

    1994-09-01

    The overall objective of this project is to develop a new approach for the direct liquefaction of coal to produce an all-distillate product slate at a sizable cost reduction over current technology. The approach integrates coal selection, pretreatment, coal swelling with catalyst impregnation, liquefaction, product recovery with characterization, alternate bottoms processing, and carrying out a technical assessment including an economic evaluation. The project is being carried out under contract to the United States Department of Energy. All three coals used in this study (Black Thunder, Burning Star bituminous, and Martin Lake lignite) are effectively swelled by a number of solvents. The most effective solvents are those having hetero-functionality. In addition, a synergistic effect has been demonstrated, in which solvent blends are more effective for coal swelling than the pure solvents alone. Therefore, it will be necessary to use only low levels of swelling agents and yet promote the impregnation of catalyst precursors. The rate of the impregnation of catalyst precursors into swollen coal increases greatly as the effectiveness of the solvent to swell the coal increases. This effect is also demonstrated by improved catalyst precursor impregnation with increased contact temperature. Laboratory- and bench-scale liquefaction experimentation is underway using swelled and catalyst impregnated coal samples. Higher coal conversions were observed for the SO{sub 2}-treated coal than the raw coal, regardless of catalyst type. Conversions of swelled coal were highest when Molyvan-L, molybdenum naphthenate, and nickel octoate, respectively, were added to the liquefaction solvent.

  1. Savannah River Ecology Laboratory annual technical progress report of ecological research, period ending July 31, 1993

    SciTech Connect

    Vaitkus, M.R.; Wein, G.R.; Johnson, G.

    1993-11-01

    This progress report gives an overview of research programs at the Savannah River Site. Topics include; environmental operations support, wood stork foraging and breeding, defense waste processing, environmental stresses, alterations in the environment due to pollutants, wetland ecology, biodiversity, pond drawdown studies, and environmental toxicology.

  2. Electrostatic beneficiation of coal. Quarterly technical progress report, July 1--September 30, 1995

    SciTech Connect

    Mazumder, M.K.; Lindquist, D.; Tennal, K.B.

    1995-10-01

    The report discusses the progress made during the eighth quarter on the following tasks: assessing beneficiation (sulfur vs. ash); effect of weathering on charging and separation; charge measurement with E-SPART analyzer; particle measurement using image processing; and petrographic analysis. Some experimental data are included.

  3. Great Basin paleoenvironmental studies project; Technical progress report: First quarter (January--August 1993)

    SciTech Connect

    1993-12-31

    Project goals, project tasks, progress on tasks, and problems encountered are described and discussed for each of the studies that make up the Great Basin Paleoenvironmental Studies Project for Yucca Mountain. These studies are: Paleobotany, Paleofauna, Geomorphology, and Transportation. Budget summaries are also given for each of the studies and for the overall project.

  4. Electrostatic beneficiation of coal. Quarterly technical progress report, April 1, 1996--June 30, 1996

    SciTech Connect

    Mazumder, M.K.; Lindquist, D.; Tennal, K.B.

    1996-07-01

    Progress reports are presented for the following: modification to the electrostatic separator; review of DOE specifications for minimum beneficiation and calculations of grinding requirements based on washability; two-pass beneficiation; analysis of different sieve fractions; measurement of charge to mass ratio as a function of height of deposition; and charging of coal against different materials.

  5. Supersonic bare metal cluster beams. Technical progress report, February 1, 1993--March 31, 1994

    SciTech Connect

    Smalley, R.E.

    1994-05-01

    This progress report describes work in the Rice group on fullerene research projects. Seven papers have gone out in this period, including two patent applications. Work includes one publication which describes a new method for the production of fullerenes using direct solar vaporization of a carbon feedstock.

  6. [Radioisotope thermoelectric generators and ancillary activities]. Monthly technical progress report, 1 April--28 April 1996

    SciTech Connect

    1996-06-01

    Tehnical progress achieved during this period on radioisotope thermoelectric generators is described under the following tasks: engineering support, safety analysis, qualified unicouple fabrication, ETG fabrication/assembly/test, RTG shipping/launch support, design/review/mission applications, and project management/quality assurance/reliability.

  7. Examining the Technical Adequacy of Progress Monitoring Using Early Writing Curriculum-Based Measures

    ERIC Educational Resources Information Center

    Hampton, David D.; Lembke, Erica S.

    2016-01-01

    The purpose of this study was to examine 4 early writing measures used to monitor the early writing progress of 1st-grade students. We administered the measures to 23 1st-grade students biweekly for a total of 16 weeks. We obtained 3-min samples and conducted analyses for each 1-min increment. We scored samples using 2 different methods: correct…

  8. Examining the Technical Adequacy of Progress Monitoring Using Early Writing Curriculum-Based Measures

    ERIC Educational Resources Information Center

    Hampton, David D.; Lembke, Erica S.

    2016-01-01

    The purpose of this study was to examine 4 early writing measures used to monitor the early writing progress of 1st-grade students. We administered the measures to 23 1st-grade students biweekly for a total of 16 weeks. We obtained 3-min samples and conducted analyses for each 1-min increment. We scored samples using 2 different methods: correct…

  9. Energy conservation in citrus processing. Technical progress report No. 2, April 1, 1980-February 28, 1981

    SciTech Connect

    Leo, M.A.; Lari, R.I.; Moore, N.R.; Broussard, M.R.; Gyamfi, M.

    1981-03-15

    Systems that reduce energy usage and are economically viable in the citrus fruit processing industry are identified. The preliminary results of Phase I are presented. Alternative systems to be considered are classified and denoted as central, modular, integrated, and combined. Progress is reported on the central and modular systems. (MCW)

  10. Stanford Geothermal Program (quarterly technical progress reports, July--September 1990 and October--December 1990)

    SciTech Connect

    Not Available

    1991-02-18

    For the summer quarter, progress is summarized and data are presented on the following: well test analysis of finite-conductivity fractures, theoretical investigation of adsorption phenomena, and optimization of reinjection strategy. For the fall quarter, activity focused on the adsorption and well testing projects. A new project investigating reinjection at the Geysers was initiated. (MHR)

  11. Projects at the Western Environmental Technology Office. Quarterly technical progress report, January 1--March 31, 1995

    SciTech Connect

    1995-06-01

    This quarterly report briefly describes recent progress in eight projects. The projects are entitled Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Spray Casting Project; and Watervliet Arsenal Project.

  12. National Assessment of Educational Progress. Career and Occupational Development Technical Report: Exercise Volume.

    ERIC Educational Resources Information Center

    Education Commission of the States, Denver, CO. National Assessment of Educational Progress.

    Exercises given to a national probability sample of 9-year-olds, 13-year-olds, 17-year-olds, and young adults (ages 26-35) to measure achievement of five broad objectives of career and occupational development (COD) are contained in this document. (The exercises were administered by the National Assessment of Educational Progress (NAEP), an…

  13. National Assessment of Educational Progress. Career and Occupational Development Technical Report: Exercise Volume.

    ERIC Educational Resources Information Center

    Education Commission of the States, Denver, CO. National Assessment of Educational Progress.

    Exercises given to a national probability sample of 9-year-olds, 13-year-olds, 17-year-olds, and young adults (ages 26-35) to measure achievement of five broad objectives of career and occupational development (COD) are contained in this document. (The exercises were administered by the National Assessment of Educational Progress (NAEP), an…

  14. Development of high efficiency cascade solar cells. Quarterly technical progress report No. 3

    SciTech Connect

    Not Available

    1980-03-31

    Progress is reported in the following areas: AlGaAsSb/GaAsSb materials development, GaInP materials development via VPE, GaAlAs/GaAs cell development, and OM/CVD studies. Spectral response, V-I characteristics, and electron microprobe analysis results are presented. (WHK)

  15. Molecular biological enhancement of coal biodesulfurization. Third quarterly technical progress report

    SciTech Connect

    Litchfield, J.H.; Fry, I.; Wyza, R.E.; Palmer, D.T.; Zupancic, T.J.; Conkle, H.N.

    1990-03-15

    The objective of this project is to produce one or more microorganisms capable of removing the organic and inorganic sulfur in coal. The original specific technical objectives of the project were to: Clone and characterize the genes encoding the enzymes of the ``4S`` pathway (sulfoxide/sulfone/sulfonate/sulfate) for release of organic sulfur from coal; Return multiple copies of genes to the original host to enhance the biodesulfurization activity of that organism; Transfer this pathway into a fast-growing chemolithotrophic bacterium; Conduct a batch-mode optimization/analysis of scale-up variables.

  16. Advanced direct liquefaction concepts for PETC generic units. Quarterly technical progress report, July 1992--September 1992

    SciTech Connect

    Not Available

    1992-11-01

    Preparation of the baseline economic assessment, based on Wilsonville Run {number_sign}263J, continued. This baseline study will serve as the reference against which the results of this program will be compared. During the quarter calculation of the material and energy balances for the conceptual commercial plant were completed and estimation of the investment for the main process units was begun (Wyoming plant site basis). A presentation on the technical results of the baseline study was prepared and delivered at the Quarterly Project Review Meeting in Pittsburgh.

  17. [Tampa Electric Company IGCC project]. Final public design report; Technical progress report

    SciTech Connect

    1996-07-01

    This final Public Design Report (PDR) provides completed design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the operating parameters and benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. Pending development of technically and commercially viable sorbent for the Hot Gas Cleanup System, the HGCU also is demonstrated. The report is organized under the following sections: design basis description; plant descriptions; plant systems; project costs and schedule; heat and material balances; general arrangement drawings; equipment list; and miscellaneous drawings.

  18. New infrared photon absorption processes. Final technical progress report, August 1, 1988--February 1, 1993

    SciTech Connect

    Bayfield, J.E.

    1993-05-01

    The fast ionization of atoms by very short laser pulses, and its possible suppression at extreme pulse intensities, is an active new field of investigation at present. Described is an investigation of whether past techniques for infrared laser multiphoton ionization of excited hydrogen atoms and of one-dimensional microwave ionization of highly excited hydrogen atoms can be combined and extended to address the new issues. Although technically difficult and requiring further improvement of apparatus, intense-field infrared laser experiments on excited hydrogen atoms are possible and can directly test theoretical and numerical results.

  19. Molecular biological enhancement of coal biodesulfurization. Tenth quarterly technical progress report, [September--December 1991

    SciTech Connect

    Litchfield, J.H.; Zupancic, T.J.; Kittle, J.D.; Baker, B.; Palmer, D.T.; Fry, I.J.; Traunero, C.G.; Wyza, R.E.; Schweitzer, A.; Conkle, H.N.; Chakravanty, L.; Tuovinen, O.H.

    1991-12-13

    The objective of this project is to produce one or more microorganisms capable of removing the organic and inorganic sulfur in coal. The specific technical objectives of the project are to: clone and characterize the genes encoding the enzymes of the ``4S`` pathway (sulfoxide/sulfone/sulfonate/sulfate) for release of organic sulfur from coal; return multiple copies of genes to the original host to enhance the biodesulfurization activity of that organism; transfer this pathway into a fast-growing chemolithotrophic bacterium; and conduct a batch-mode optimization/analysis of scale-up variables.

  20. Molecular biological enhancement of coal biodesulfurization. Fourth quarterly technical progress report

    SciTech Connect

    Litchfield, J.H.; Fry, I.; Wyza, R.E.; Palmer, D.T.; Zupancic, T.J.; Conkle, H.N.

    1990-06-14

    The objective of this project is to produce one or more microorganisms capable of removing the organic and inorganic sulfur in coal. The original specific technical objectives of the project were to: clone and characterize the genes encoding the enzymes of the ``4S`` pathway (sulfoxide/sulfone/sulfonate/sulfate) for release of organic sulfur from coal; return multiple copies of genes to the original host to enhance the biodesulfurization activity of that organism; transfer this pathway into a fast-growing chemolithotropic bacterium; conduct a batch-mode optimization/analysis of scale-up variables.

  1. Molecular biological enhancement of coal biodesulfurization. First quarterly technical progress report

    SciTech Connect

    Litchfield, J.H.; Palmer, D.T.; Zupancic, T.J.; Conkle, H.N.

    1989-09-15

    The objective of this project is to produce one or more microorganisms capable of removing the organic and inorganic sulfur in coal. The original specific technical objectives of the project were to: Clone and characterize the genes encoding the enzymes of the ``4S`` pathway (sulfoxide/sulfone/sulfonate/sulfate) for release of organic sulfur from coal; return multiple copies of genes to the original host to enhance the biodesulfurization activity of that organism; transfer this pathway into a fast-growing chemolithotropic bacterium; conduct a batch-mode optimization/analysis of scale-up variables.

  2. Molecular biological enhancement of coal biodesulfurization. Ninth quarterly technical progress report

    SciTech Connect

    Litchfield, J.H.; Zupancic, T.J.; Baker, B.; Palmer, D.T.; Fry, I.J.; Tranuero, C.G.; Wyza, R.E.; Schweitzer, A.; Conkle, H.N.; Chakravanty, L.; Tuovinen, O.H.

    1991-09-13

    The objective of this project is to produce one or more microorganisms capable of removing the organic and inorganic sulfur in coal. The original specific technical objectives of the project were to: clone and characterize the genes encoding the enzymes of the ``4S`` pathway (sulfoxide/sulfone/sulfonate/sulfate) for release of organic sulfur from coal; return multiple copies of genes to the original host to enhance the biodesulfurization activity of that organism; transfer this pathway into a fast-growing chemolithotropic bacterium; conduct a batch-mode optimization/analysis of scale-up variables.

  3. Kokanee Stock Status and Contribution of Cabinet Gorge Hatchery, Lake Pend Oreille, Idaho, 1989 Annual Progress Report.

    SciTech Connect

    Hoelscher, Brian

    1990-04-01

    The kokanee Oncorhynchus nerka rehabilitation program for Lake Pend Oreille continued to show progress during 1989. Estimated kokanee abundance in late August was 7.71 million fish. Decreased population size is the result of lower hatchery and wild fry recruitment and low age 1+ survival. Lower recruitment of wild fry in 1989 resulted from a smaller parental escapement in 1988 and lower wild fry survival. Six fry release strategies were evaluated in 1989. Two groups were released in Clark Fork River to help improve a spawning run to Cabinet Gorge Hatchery. Survival from the mid-summer release, which was barged down Clark Fork River to avoid low flow problems, was not significantly different from the early release. The final assessment of these release strategies will be evaluated when adults return to Cabinet gorge Hatchery in 1992 and 1993. Fry released to support the Sullivan Springs Creek spawning run also survived will in 1989. Two open-water releases were made during early and mid-summer. 30 refs., 26 figs., 2 tabs.

  4. Stable carbon isotope analysis of coprocessing materials: Quarterly technical progress report, October 1--December 31, 1988

    SciTech Connect

    Burke, F.P.; Winschel, R.A.; Lancet, M.S.

    1989-03-01

    Consol R and D will develop and demonstrate stable carbon isotope analysis as a method to quantitatively distinguish coal-derived and petroleum-derived carbon in products from coal/petroleum coprocessing. The approach taken will be to develop the method, then demonstrate its application on authentic continuous-unit products. The significance of selective isotopic fractionation will be determined and, if necessary, corrections will be applied to account for it. Precision, accuracy and range of applicability will be defined. The value of accessory analytical techniques will also be assessed. Results achieved this quarter include: feed and product fractions from hydroprocessing bench unit runs at the Kentucky Center for Applied Energy Research (CAER) were received, and samples from a Kentucky tar sand bitumen-only run were analyzed for carbon isotope ratios. Repeat carbon isotope analyses of seven samples from HRI Coprocessing Run 227-53 resulted in improved carbon balances for one run period. Athabasca ASB, Cold Lake ASB and Maya ASB were fractionated by distillation and solubility fractionation to determine the homogeneity of each petroleum with respect to carbon isotope ratios. 9 figs., 2 tabs.

  5. In vivo mutagenicity and clastogenicity of ionizing radiation in nuclear medicine. Annual technical progress report, [1991

    SciTech Connect

    Kelsey, K.T.

    1991-12-31

    The overall goal of our research remains to investigate the mutagenic and clastogenic effects of exposure to low levels of ionizing radiation to human lymphocytes. Principally, we are studying hospital patients referred to a nuclear medicine department for diagnostic cardiac imaging and nuclear medicine technologies who administer radionuclides. Emphasis in the first year, as described in the first progress report, was on optimization of the hprt mutation assay, measurement of mutant frequencies in patients imaged with thallium-201, and measurement of mutant frequencies in controls. Emphasis in the second year has been on measurements of (1) chromosome aberrations in patients imaged with thallium-201, (2) mutant frequencies in patients imaged with technetium-99, (3) mutant frequencies in nuclear medicine technicians and physical therapists, (4) mutant frequencies in patients treated for Hodgkins disease with radiotherapy. The progress in these areas is described.

  6. Coal-feeder development. Second quarterly technical progress report, January-March 1980

    SciTech Connect

    Mistry, D.K.

    1981-04-01

    The pilot-scale piston-feeder development is progressing satisfactorily and should proceed as planned. The bench scale testing of components, sub-system and critical areas continued to provide very useful information in support of the development of the complete feeder. The K30M seals and polyurethane scrapers are showing very promising results. The components development facility is being upgraded and testing at the bench scale level should be vigorously perused. The upgrading of the pilot scale feeder and its system will be emphasized during the next quarter to perform feeder capabilities and limitations testing. No progress on the 5.5-in. diameter pilot scale screw feeder has been made because IRRI is waiting decision from METC as to when the feeder can be installed on the 42-in. gas producer.

  7. Biomass power for rural development. Technical progress report, January 1--March 31, 1998

    SciTech Connect

    Neuhauser, E.

    1998-11-01

    Brief progress reports are presented on the following tasks: design packages for retrofits at the Dunkirk Station; fuel supply and site development plans; major equipment guarantees and project risk sharing; power production commitment; power plant site plan, construction and environmental permits; and experimental strategies for system evaluation. The paper then discusses in more detail the following: feedstock development efforts; clone-site testing and genetic studies; and efforts at outreach, extension and technology transfer.

  8. Advanced thermally stable jet fuels. Technical progress report, July 1995--September 1995

    SciTech Connect

    Schobert, H.H.; Eser, S.; Song, C.

    1995-10-01

    The Penn State program in advanced thermally stable jet engine fuels has five components: development of mechanisms of degradation and solids formation; quantitative measurement of growth of sub-micrometer-sized and micrometer particles suspended in fuels during thermal stresses; characterization of carbonaceous deposits by various instrumental and microscopic methods; elucidation of the role of additives in retarding the formation of carbonaceous solids; and assessment of the potential of producing high yields of cycloalkanes and hydroaromatics by direct coal liquefaction. Progress is described.

  9. U.C. Davis high energy particle physics research: Technical progress report -- 1990

    SciTech Connect

    1990-12-31

    Summaries of progress made for this period is given for each of the following areas: (1) Task A--Experiment, H1 detector at DESY; (2) Task C--Experiment, AMY detector at KEK; (3) Task D--Experiment, fixed target detectors at Fermilab; (4) Task F--Experiment, PEP detector at SLAC and pixel detector; (5) Task B--Theory, particle physics; and (6) Task E--Theory, particle physics.

  10. Shale oil value enhancement research. First quarterly technical progress report, March 1, 1993--May 31, 1993

    SciTech Connect

    Bunger, J.W.; Russell, C.P.; Devineni, P.A.V.; Cogswell, D.E.; Wiser, J.W.

    1993-06-25

    Concurrent progress is being made in all key areas, namely, separation, characterization and market assessment. The market area, not one of our traditionally strong areas, has been going better than expected. We believe this is due mainly to the emerging interest in new and unconventional materials. The characterization work has been progressing solidly with the fundamental Z-BASIC correlations providing information not heretofore available in the chemical literature. Our agreement with Hewlett-Packard regarding the purchase of equipment at a reduced price is complete and the gc-ms will be ordered shortly. The separation work has progressed satisfactorily although an unexpected amount of time has been required for ``facilities`` and ``equipment`` related issues. Some of these issues have dealt with safety and regulatory compliance when storing larger quantities of samples. These now seem to be solved. We have a lot of direct experience in shale oil separations dating back to the OXY project and before. Also, we will streamline our work by going to prepacked micro-separation tools for some of our separation characterization work. This will allow us to stay on schedule. Overall, we are on schedule with the project. All administration requirements are in place and the accounting and financial records are current.

  11. User's guide. RPGrow$: A red pine growth and analysis spreadsheet for the lake states. Forest Service general technical report

    SciTech Connect

    Hyldahl, A.A.; Grossman, G.H.

    1993-01-01

    RPGrow$ is a spreadsheet that interactively calculates stand-level growth and yield predictions with financial analysis for red pine plantations in the Lake States. The spreadsheet is based on basal area growth models from Wambach (1967), Buckman (1962), and Lundgren and Belcher (1982). The financial analysis is based on discounted cash flow. The user inputs site index, stand age, basal area, trees/acre, thinning regime, incremental cost data, and price data. The growth model will automatically project stands for 70 years.

  12. West Hackberry Tertiary Project. Quarterly technical progress report, September 3, 1993--December 3, 1993

    SciTech Connect

    Fassihi, M.R.; Gillham, T.H.

    1993-11-30

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoirs for the project are the Camerina C- 1,2,3 Sands located on the west flank of West Hackberry Field in Cameron Parish, Louisiana. If successful, this project win demonstrate that the use of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presently uneconomical.

  13. Salt Repository Project. Technical progress report for the quarter, 1 April-30 June 1984

    SciTech Connect

    Not Available

    1984-01-01

    This report describes the technical accomplishments during the period from April through June 1984, on the commercial nuclear waste management programs under the direction of the US Department of Energy (DOE), Salt Repository Project Office (SRPO), Office of Nuclear Waste Isolation (ONWI). ONWI's activities within the Salt Repository Project include comprehensive geologic exploration, technology development, equipment testing, and model verification activities, as well as work which supports the design, licensing, construction, operation, and decommissioning activities required to provide geologic repositories and spent fuel handling and packaging facilities. Work in other geologic media (basalt, tuff, and crystalline media such as granite) is carried on by other Office of Civilian Radioactive Waste Management (OCRWM) components. Additionally, development of the technology, methodology, and facilities for interim spent fuel storage, waste treatment, and waste transportation, which are interfacing activities with the terminal isolation activity in the national waste management program, is being carried out in other OCRWM efforts.

  14. Advanced direct liquefaction concepts for PETC generic units. Quarterly technical progress report, April 1994--June 1994

    SciTech Connect

    1994-09-01

    The technical approach of the contract has been expanded to provide additional economic evaluation of related process options. Additional data will be developed in the following areas to facilitate these evaluations. The effect of several modified pretreatments on liquefaction will be investigated. These include catalytic and thermal dewaxing of distillate solvents, the effect that adding light resid to distillate solvent has on hydrotreating and dewaxing, the liquefaction behavior of dense-media separated low-rank coals, and methods of selectively removing oxygen from low-rank coals. Additional chemical, physical, and performance information on improved first-stage catalysts will be developed. Upgrading of ash concentrate to recover catalysts and improve low-rank coals will be assessed. The conversion of residual fractions to distillate by hydropyrolysis will be evaluated. The economic impact of these processes will be determined.

  15. Diagnostic development and support of MHD test facilities. Technical progress report, January--March 1991

    SciTech Connect

    Shepard, W.S.; Cook, R.L.

    1991-12-31

    The Diagnostic Instrumentation and Analysis Laboratory (DIAL) at Mississippi State University (MSU) is developing diagnostic instruments for magnetohydrodynamic (MHD) power train data acquisition and for support of MHD component development test facilities. Microprocessor-controlled optical instruments, initially developed for Heat Recovery/Seed Recovery (HRSR) support, are being refined, and new systems to measure temperatures and gas-seed-slag stream characteristics are being developed. To further data acquisition and analysis capabilities, the diagnostic systems are being interfaced with DIAL`S computers. Technical support for the diagnostic needs of the national MHD research effort is being provided. DIAL personnel also cooperate with government agencies and private industries to improve the transformation of research and development results into processes, products and services applicable to their needs.

  16. Diagnostic development and support of MHD Test Facilities. Technical progress report, October 1991--December 1991

    SciTech Connect

    Not Available

    1994-07-01

    The Diagnostic Instrumentation and Analysis Laboratory (DIAL) at Mississippi State University (MSU) is developing diagnostic instruments for magnetohydrodynamic (MHD) power train data acquisition and for support of MHD component development test facilities. Microprocessor-controlled optical instruments, initially developed for Heat Recovery/Seed Recovery (HRSR) support, are being refined, and new systems to measure temperatures and gas-seed-slag stream characteristics are being developed. To further data acquisition and analysis capabilities, the diagnostic systems are being interfaced with DIAL`s computers. Technical support for the diagnostic needs of the national MHD research effort is being provided. DIAL personnel also cooperate with government agencies and private industries to improve the transformation of research and development results into processes, products and services applicable to their needs.

  17. The Progression of Podcasting/Vodcasting in a Technical Physics Class

    NASA Astrophysics Data System (ADS)

    Glanville, Y. J.

    2010-11-01

    Technology such as Microsoft PowerPoint presentations, clickers, podcasting, and learning management suites is becoming prevalent in classrooms. Instructors are using these media in both large lecture hall settings and small classrooms with just a handful of students. Traditionally, each of these media is instructor driven. For instance, podcasting (audio recordings) provided my technical physics course with supplemental notes to accompany a traditional algebra-based physics lecture. Podcasting is an ideal tool for this mode of instruction, but podcasting/vodcasting is also an ideal technique for student projects and student-driven learning. I present here the various podcasting/vodcasting projects my students and I have undertaken over the last few years.

  18. PCBs and related compounds in Lake Hartwell. Technical completion report 1 May 86-30 May 88

    SciTech Connect

    Elzerman, A.W.; Dunnivant, F.M.; Germann, G.G.

    1991-03-01

    To obtain necessary data for modeling and assessments of PCBs in the Lake Hartwell (SC, GA) system, the research concerned (1) analyses for individual congeners, (2) information on PCBs and lake characteristics that affect PCB distributions, (3) PCB sediment concentrations, (4) factors affecting horizontal and vertical distributions, including physical, chemical and biological 'weathering', (5) values for physical/chemical parameters required for fate models, (6) laboratory studies of PCB sorption on sediments, and (7) radionuclides as tracers and markers to calibrate models. Segmented sediment cores (95) were collected from Lake Hartwell over the period 1984 to 1987. Total PCB sediment concentrations (dry basis) ranged from < 0.01 microgram/g to > 100 micrograms/g, generally decreasing with distance from the known source. Horizontal and vertical variations were related to inputs and weathering. The total inventory of PCBs in sediments was estimated to be approximately 41,000 (+ or - 15,000) kg. Congener specific data indicated weathering of PCBs resulted in significant fractionation between congeners. Values for solubility, Henry's Law constants and vapor pressures were measured for selected congeners and predicted for all 209 congeners by quantitative structure-property relationships (QSPRs). Extensive investigations of sorption of PCBs on sediments indicated slow desorption rates influence the fate and effects of PCBs.

  19. Early lung cancer detection in uranium miners with abnormal sputum cytology. Technical progress report, July 31, 1991--July 31, 1992

    SciTech Connect

    Saccomanno, G.

    1992-08-01

    This work supported by the United States of Energy, continues to add data on the health affects of cigarette smoking and radon exposure on uranium miners. Since the last Technical Progress Report in July or 1991, 537 sputum cytology samples have been collected on the 300 uranium workers in the surveillance study. To date there are 436 lung cancer cases in the Uranium Miner Tumor Registry with diagnostic slides from surgery and/or autopsy; an additional 40 cases have been diagnosed with sputum cytology only. In March of 1991 the Geno Saccomanno Uranium Workers Archive was established at St. Mary`s Hospital and Medical Center as a depository for biological specimens and epidemiological data from the 17,700 uranium miners who have been a part or the study.

  20. Advanced coal conversion process demonstration. Technical progress report for the period July 1, 1995--September 30, 1995

    SciTech Connect

    1997-05-01

    This report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project from July 1, 1995 through September 30, 1995. The ACCP Demonstration Project is a US Department of Energy (DOE) Clean Coal Technology Project. This project demonstrates an advanced, thermal, coal upgrading process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to a high-quality, low-sulfur fuel, registered as the SynCoal process. The coal is processed through three stages (two heating stages followed by an inert cooling stage) of vibrating fluidized bed reactors that remove chemically bound water, carboxyl groups, and volatile sulfur compounds. After thermal upgrading, the cola is put through a deep-bed stratifier cleaning process to separate the pyrite-rich ash from the coal.

  1. GT-MHR COMMERCIALIZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD AUGUST 1 THROUGH AUGUST 31, 2003

    SciTech Connect

    SHENOY, A.S.

    2003-08-01

    OAK A271 GT-MHR COMERCIALZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD AUGUST 1 THROUGH AUGUST 31, 2003. In the process of fabricating the MHR-1 irradiation test capsule, Petten has advised that three thermocouples (out of 24) and the Self Powered Neutron detector were damaged during high temperature brazing with the upper capsule lid. Procurement of new TCs and SPN is in process but there will be a delay in the irradiation test of about nine weeks. Startup of the irradiation is now projected to be July or August 2004. In preparation for performing the nuclear design analysis activities required by the advanced fuel studies task, a complete 3-D nuclear design analysis is first being performed of the GT-MHR reference design. This will serve as the baseline for studies of the advanced fuel nuclear design performance.

  2. GT-MHR COMMERCIALZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD JUNE 1 THROUGH JUNE 30, 2003

    SciTech Connect

    SHENOY, A.S.

    2003-06-01

    A271 GT-MHR COMMERCIALZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD JUNE 1 THROUGH JUNE 30, 2003. Petten was provided with irradiation dimensional change data for both fuel compacts and H-451 graphite for design of the graphite sleeves that hold the fuel compacts to be irradiated in HFR-EU2. The Fuel Sample Product Specification for the Fuel Performance Irradiation Test Capsule MHR-2 was completed and approved. A Work Breakdown Structure was prepared for the development and qualification of advanced coated-particle fuels capable of meeting anticipated fuel performance requirements and work was initiated on preparation of schedules and a cost estimates for the test matrices.

  3. Advanced direct liquefaction concepts for PETC generic units, Phase 2. Quarterly technical progress report, January--March 1996

    SciTech Connect

    1996-05-01

    The aims of this research program are to advance to bench-scale testing, concepts that have the potential for making net reductions in direct coal liquefaction process costs. The research involves a teaming arrangement between the University of Kentucky Center for Applied Energy Research (CAER), Consolidation Coal Company (CONSOL), Sandia National Laboratories (SNL), and LDP Associates. Progress reports are presented for: Task 2.1.1 development of a catalyst screening test (UK/CAER); Task 2.1.2 activation of impregnated catalysts (UK/CAER); Task 2.2 laboratory support (CONSOL); Task 3 continuous operations/parametric studies (Hydrocarbon Technologies, Inc.) and; Task 4.4 conceptual design, preliminary technical assessment (LDP Associates).

  4. Management of dry flue gas desulfurization by-products in underground mines. Quarterly technical progress report, April 1995--June 1995

    SciTech Connect

    Chugh, Y.P.; Dutta, D.; Esling, S.

    1995-07-01

    On September 30, 1993, the U.S. Department of Energy-Morgantown Energy Technology Center and Southern Illinois University at Carbondale (SIUC) entered into a cooperative research agreement entitled {open_quotes}Management of Dry Flue Gas Desulfurization By-Products in Underground Mines{close_quotes} (DE-FC21-93MC30252). Under the agreement Southern Illinois University at Carbondale will develop and demonstrate several technologies for the placement of coal combustion residues in abandoned coal mines, and will assess the environmental impact of such underground residues placement. Previous quarterly Technical Progress Reports have set forth the specific objectives of the program, and a discussion of these is not repeated here. Rather, this report discusses the technical progress made during the period April 1 - June 30, 1995. A final topical report on the SEEC, Inc. demonstration of its technology for the transporting of coal combustion residues was completed during the quarter, although final printing of the report was accomplished early in July, 1995. The SEEC technology involves the use of Collapsible Intermodal Containers (CIC`s) developed by SEEC, and the transportation of such containers - filled with fly ash or other coal combustion residues - on rail coal cars or other transportation means. Copies of the final topical report, entitled {open_quotes}The Development and Testing of Collapsible Intermodal Containers for the Handling and Transport of Coal Combustion Residues{close_quotes} were furnished to the Morgantown Energy Technology Center. The Rapid Aging Test colums were placed in operation during the quarter. This test is to determine the long-term reaction of both the pneumatic and hydraulic mixtures to brine as a leaching material, and simulates the conditions that will be encountered in the actual underground placement of the coal combustion residues mixtures. The tests will continue for about one year.

  5. Technical Progress Report on Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration

    SciTech Connect

    Bill Stanley; Patrick Gonzalez; Sandra Brown; Jenny Henman; Ben Poulter; Sarah Woodhouse Murdock; Neil Sampson; Tim Pearson; Sarah Walker; Zoe Kant; Miguel Calmon; Gilberto Tiepolo

    2006-06-30

    The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects, providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between April 1st and July 30th 2006. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool. Work is being carried out in Brazil, Belize, Chile, Peru and the USA.

  6. Thermionic cogeneration burner assessment study. Third quarterly technical progress report, April-June, 1983

    SciTech Connect

    Not Available

    1983-01-01

    The specific tasks of this study are to mathematically model the thermionic cogeneration burner, experimentally confirm the projected energy flows in a thermal mock-up, make a cost estimate of the burner, including manufacturing, installation and maintenance, review industries in general and determine what groups of industries would be able to use the electrical power generated in the process, select one or more industries out of those for an in-depth study, including determination of the performance required for a thermionic cogeneration system to be competitive in that industry. Progress is reported. (WHK)

  7. Fusion programs in applied plasma physics. Technical progress report, July 11, 1992--May 31, 1993

    SciTech Connect

    Not Available

    1993-07-01

    This report summarizes the progress made in theoretical and experimental research funded by US Department of Energy Grant No. DE-FG03-92ER54150, during the period July 11, 1992 through May 31, 1993. Four main tasks are reported: applied plasma physics theory, alpha particle diagnostic, edge and current density diagnostic, and plasma rotation drive. The report also discusses the research plans for the theory and experimental programs for the next grant year. Reports and publications supported by the grant during this period are listed in the final section.

  8. Physics of correlated systems. Technical progress report, December 1996--June 1999

    SciTech Connect

    Greene, C.H.

    1999-02-01

    During the current funding period, which covers a period of approximately 2.5 years, the authors have tackled a number of challenging problems that involve nonperturbative particle-particle interactions in two qualitatively different areas: electron-electron interactions in photoionization and photodetachment, and atom-atom interactions in Bose-Einstein condensates. The following discusses the progress achieved in these different areas. The emphasis in this summary will concentrate on approximately the last year of research accomplishments, although the bibliography below includes all research publications that were supported during the time period of this grant.

  9. Decontamination Systems Information and Research Program. Quarterly technical progress report, July 1--September 30, 1993

    SciTech Connect

    Not Available

    1993-10-01

    Progress reports are presented for the following projects: systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies--drain-enhanced soil flushing (DESF) for organic contaminants removal; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors--monolayer and multilayer self-assembled films for chemical sensors; Winfield Lock and Dam remediation; Winfield cleanup survey; assessment of technologies for hazardous waste site remediation--non-treatment technologies and pilot scale test facility implementation; assessment of environmental remediation storage technology; assessment of environmental remediation excavation technology; assessment of environmental remediation monitoring technology; and remediation of hazardous sites with steam reforming.

  10. Center for electronics and electrical engineering. Technical progress bulletin covering center programs, July to September 1990, with 1991 CEEE events calendar

    NASA Astrophysics Data System (ADS)

    Gonzalez, J. A.

    1991-01-01

    The report is the thirty-second issue of a quarterly publication providing information on the technical work of the National Institute of Standards and Technology (formerly the National Bureau of Standards) Center for Electronics and Electrical Engineering (CEEE). The issue of the CEEE Technical Progress Bulletin covers the third quarter of calendar year 1990. Abstracts are provided by technical area for both published papers and papers approved by NIST for publication. General topics discussed include the following: Semiconductor Technology Program; Signals and Systems Metrology Program; Additional Information; 1991 CEEE Calendar; Sponsor List; and Key Contacts in Center, Center Organization.

  11. GPHS-RTGs in support of the Cassini RTG Program. Semi annual technical progress report, September 26, 1994--April 2, 1995

    SciTech Connect

    1995-04-20

    The technical progress achieved during the period 26 September 1994 through 2 April 1995 on Contract DE-AC03-91SF18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described herein. Monthly technical activity for the period 27 February 1995 through 2 April 1995 is included in this progress report. The report addresses tasks, including: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; ETG Fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair; and CAGO acquisition (capital funds).

  12. Methyl chloride via oxyhydrochlorination of methane. Quarterly technical progress report No. 6, January--March 1993

    SciTech Connect

    Not Available

    1993-11-01

    The purpose of this contract is to develop a process for converting light alkane gases to methyl chloride via oxyhydrochlorination using highly selective, stable catalysts in fixed-bed reactors designed to remove the large amount of heat generated, so as to control the reaction temperature. Further, the objective is to obtain the engineering data base necessary for developing a commercially feasible process and to evaluate the economics of the process. This document reports significant progress this quarter toward the development of a stable heterogeneous packed bed catalyst for the oxyhydrochlorination of methane. This quarter`s data shows a catalyst which gave an average 18% methane conversion and 78% MeCl selectivity for a 12 day period of time. The PDU (Process Development Unit) design engineering effort made significant progress this quarter. A bid on a modular unit by Xytel Corp. was received and evaluated. The pre-engineering estimate showed that costs were considerably higher than the original project capital estimates. A rigorous effort was made to eliminate all non-essential equipment and scope of work. A reduced scope was agreed upon and in the second round both Xytel and the Dow Corning in-house facilities engineering team were allowed to bid on the package.

  13. Upgraded coal interest group. First quarterly technical progress report, October 1, 1994--December 31, 1994

    SciTech Connect

    Weber, W.; Lebowitz, H.E.

    1994-12-31

    The interest group got under way effective January 1, 1994, with nine utility members, EPRI, Bechtel, and the Illinois Clean Coal Institute. DOE participation was effective October 1, 1994. The first meeting was held on April 22, 1994 in Springfield, Illinois and the second meeting was held on August 10--11, 1994 at Johnstown, Pennsylvania. Technical reviews were prepared in several areas, including the following: status of low rank coal upgrading, advanced physical coal cleaning, organic sulfur removal from coal, handling of fine coal, combustion of coal water slurries. It was concluded that, for bituminous coals, processing of fines from coal cleaning plants or impoundments was going to be less costly than processing of coal, since the fines were intrinsically worth less and advanced upgrading technologies require fine coal. Penelec reported on benefits of NOX reductions when burning slurry fuels. Project work was authorized in the following areas: Availability of fines (CQ, Inc.), Engineering evaluations (Bechtel), and Evaluation of slurry formulation and combustion demonstrations (EER/MATS). The first project was completed.

  14. Pipeline gas demonstration plant, Phase I. Quarterly technical progress report, December 1980-February 1981

    SciTech Connect

    Eby, R.J.

    1981-03-01

    Work was performed in the following areas of the Pipeline Gas Demonstration Plant Program: site evaluation and selection; demonstration plant environmental analysis; feedstock plans, licenses, permits and easements; demonstration plant definitive design; construction planning; economic reassessment; technical support; long lead procurement list; and project management. Major work activity continued to be the effort on Demonstration Plant Definitive Design. A Construction Readiness Audit was held on January 14 to 16, 1981 by a Government/Procon team to review the project and assess the readiness of the project to proceed into the construction phase. Documents for the 60% Design Review were prepared for ICGG review and submitted to the Contracting Officer's authorized representative prior to transmittal to the Corps of Engineers for review. The Corps of Engineers conducted a design audit. The primary objective of the audit was to prepare an independent estimate of the work remaining to complete Phase I of the project. Work continued on the production of a single bid package for the Demonstration Plant, suitable for release to a single constructor, and organized so it can be easily broken down into subpackages by construction specialty. A formal audit of the ICGG R/QA Plan and implementation thereof was performed February 11-12, 1981 by the Corps of Engineers. The Contract Deliverable Final Feedstock-Product-Waste Disposal Plan was delivered to the Government on February 25, 1981.

  15. Indiana University high energy physics, Task A. Technical progress report, April 1991--April 1992

    SciTech Connect

    Brabson, B.; Crittenden, R.; Dzierba, A.; Hanson, G.; Martin, H.; Marshall, T.; Mir, R.; Mouthy, T.; Ogren, H.; Rust, D.; Teige, S.; Zieminska, D.; Zieminski, A.

    1992-10-01

    During this reporting period the group has been carrying out programs in several areas. These are presented in this paper is follows: The group was a collaborator in the Mark II experiment at the SLC and completed analysis on the experiment. Three students completed their theses this reporting period; the group is the prime mover in (E672), a high mass dimuon experiment which now in its final data collection period. Our group is also a collaborator in the DO collider experiment which is now preparing for the first data run in 1992; the group is a collaborator in the OPAL experiment at LEP which is now taking data. The group also is working on the development of a major offline facility shift and on a silicon vertex chamber for 1993; the group is the prime mover in the construction of a major new experiment (E852) in precision meson spectroscopy. A test run is presently underway and data taking will begin in 1993; and the group is a prime mover in the tracking design of the SDC experiment. The SDC has completed the Technical Design report. Construction will begin in 1993.

  16. Savannah River Ecology Laboratory. Annual technical progress report of ecological research

    SciTech Connect

    Smith, M.H.

    1996-07-31

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA). The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts basic and applied ecological research, as well as education and outreach programs, under a contract with the U.S. Department of Energy (DOE) at the Savannah River Site (SRS) near Aiken, South Carolina. Significant accomplishments were made during the past year in the areas of research, education and service. The Laboratory`s research mission was fulfilled with the publication of two books and 143 journal articles and book chapters by faculty, technical and students, and visiting scientists. An additional three books and about 80 journal articles currently are in press. Faculty, technician and students presented 193 lectures, scientific presentations, and posters to colleges and universities, including minority institutions. Dr. J Vaun McArthur organized and conducted the Third Annual SREL Symposium on the Environment: New Concepts in Strewn Ecology: An Integrative Approach. Dr. Michael Newman conducted a 5-day course titled Quantitative Methods in Ecotoxicology, and Dr. Brian Teppen of The Advanced Analytical Center for Environmental Sciences (AACES) taught a 3-day short course titled Introduction to Molecular Modeling of Environmental Systems. Dr. I. Lehr Brisbin co-hosted a meeting of the Crocodile Special Interest Group. Dr. Rebecca Sharitz attended four symposia in Japan during May and June 1996 and conducted meetings of the Executive Committee and Board of the International Association for Ecology (ENTECOL).

  17. Advanced emissions control development program. Quarterly technical progress report No. 9, October 1--December 31, 1996

    SciTech Connect

    Evans, A.P.

    1996-12-31

    Babcock & Wilcox (B&W) is conducting a five-year project aimed at the development of practical, cost-effective strategies for reducing the emissions of hazardous air pollutants (commonly called air toxics) from coal-fired electric utility plants. The need for air toxic emissions controls may arise as the U.S. Environmental Protection Agency proceeds with implementation of Title III of the Clean Air Act Amendment of 1990. Data generated during the program will provide utilities with the technical and economic information necessary to reliably evaluate various air toxics emission compliance options such as fuel switching, coal cleaning, and flue gas treatment. The development work is being carried out using B&W`s new Clean Environment Development Facility (CEDF) wherein air toxics emission control strategies can be developed under controlled conditions, and with proven predictability to commercial systems. Tests conducted in the CEDF provide high quality, repeatable, comparable data over a wide range of coal properties, operating conditions, and emissions control systems. Development work to date has concentrated on the capture of mercury, other trace metals, fine particulate, and the inorganic species hydrogen chloride and hydrogen fluoride.

  18. West Hackberry Tertiary Project. Quarterly technical progress report, January 1, 1996--March 31, 1996

    SciTech Connect

    Gillham, T.; Cerveny, B.; Turek, E.

    1996-04-10

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility of combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoir for the project is the Camerina C-1,2,3 sand located on the West Flank of West Hackberry Field in Cameron Parish, Louisiana. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presently uneconomic. The first quarter of 1996 was outstanding both in terms of volume of air injected and low cost operations. More air was injected during this quarter than in any preceding quarter. The compressors experienced much improved run time with minimal repairs. Low operating costs resulted from no repairs required for injection or production wells. A discussion of the following topics are contained herein: (1) performance summary for the injection and production wells, (2) air compressor operations, (3) updated bottom hole pressure data, (4) technology transfer activities and (5) plans for the upcoming quarter.

  19. Pulverized coal firing of aluminum melting furnaces. Quarterly technical progress report, July 1-September 30, 1979

    SciTech Connect

    West, C E

    1980-09-01

    The ultimate objective of this program is the commercial demonstration of an efficient, environmentally acceptable coal firing process suitable for implementation on melting furnaces throughout the aluminum industry. To achieve this goal, the program has been divided into two phases. Phase I has begun with the design and construction of a 350 pound (coal) per hour staged slagging cyclone combustor (SSCC) attached to a 7-ft diameter aluminum melting ladle furnace. Process development will culminate with a 1000 pph prototype SSCC firing a 40,000 pound capacity open hearth melting furnace at the Alcoa Laboratories. Phase II implementation is currently planned for Alcoa's Lafayette, IN, Works, where two of the ingot plant's five open hearth melting furnaces will be converted to utilize coal. In addition to confirmation of data gathered in Phase I, the effect of extended production schedule operation on equipment and efficiencies will be determined. This work would begin in 1982 pursuant to technical and economic evaluation of the process development at that time.

  20. Technical progress report for the Magnetohydrodynamics Coal-Fired Flow Facility, October 1, 1993--December 31, 1993

    SciTech Connect

    Not Available

    1994-06-01

    In this quarterly technical progress report, UTSI reports on progress in developing the technology for the steam bottoming portion of the MHD Steam Combined Cycle power plant. The experimental program was effectively terminated and reoriented to preparation of reports on previous tests and maintaining the DOE facility. In this report, the results of tube corrosion studies for the samples removed after 500 hours of western coal testing are summarized. Plans for evaluating the tube samples after termination of the tests at 1,047 hours are discussed. The status of development of models to predict ash deposition on conductive heat transfer tubes and their validation with experimental data is presented. Modeling and experiments to induce agglomeration of particulate are also discussed. Significant accomplishments, findings and conclusions include: In summary, corrosion measurements on typical, commercial stainless steels and on low and intermediate chromium steels after 639 hours of LMF5 exposure in the SHTM test sections revealed corrosion that was generally acceptable in magnitude if corrosion kinetics are parabolic, but, except for the higher chromium alloys 253MA and 310, not if kinetics are linear. The production of bilayer scales, and the large amount of scale separation and fragmentation make long term parabolic kinetics unlikely, and result in a high likelihood for breakaway corrosion.

  1. Coal-fired MHD combustor development project: Phase IIIB. First quarterly technical progress report, 13 January-30 April 1982

    SciTech Connect

    1982-05-20

    The first quarterly technical progress report of the Coal-Fired MHD Combustor Development Project (Phase IIIB) presents the accomplishments during the period 13 January to 30 April, 1982. The scope of work covered by this quarterly report relates to those tasks associated with preparing the TRW 20 MW/sub t/ MHD coal combustor for delivery to AERL for integrated power tests and the work associated with the preliminary design of a 50 MW/sub t/ coal-fired combustor. Progress during this reporting period is described. All new 20 MW/sub t/ hardware was designed and fabricated. Interface coordination meetings were conducted with AERL and DOE. Interface control drawings were completed and a 20 MW/sub t/ coal combustion User's manual was delivered to AERL. The User's manual contained a shipping plan, a crew training plan, an assembly manual, interface documentation and recommended operating procedures. Facility/combustor set-up was completed and the pre-delivery 20 MW/sub t/ coal combustor qualification test series was completed. The 50 MW/sub t/ coal-fired MHD combustor preliminary designs were finalized and the DOE preliminary design review (PDR) was successfully completed.

  2. Bioconversion of coal derived synthesis gas to liquid fuels. Quarterly technical progress report, 1 April--30 June 1994

    SciTech Connect

    Jain, M.K.; Worden, R.M.; Grethlein, A.

    1994-07-18

    The overall objective of the project is to develop an integrated two-stage fermentation process for conversion of coal-derived synthesis gas to a mixture of alcohols. This is achieved in two steps. In the first step, Butyribacterium methylotrophicum converts carbon monoxide (CO) to butyric and acetic acids. Subsequent fermentation of the acids by Clostridium acetobutylicum leads to the production of butanol and ethanol. The tasks for this quarter were: development/isolation of superior strains for fermentation of syngas; evaluation of bioreactor configuration for improved mass transfer of syngas; recovery of carbon and electrons from H{sub 2}-CO{sub 2}; initiation of pervaporation for recovery of solvents; and selection of solid support material for trickle-bed fermentation. Technical progress included the following. Butyrate production was enhanced during H{sub 2}/CO{sub 2} (50/50) batch fermentation. Isolation of CO-utilizing anaerobic strains is in progress. Pressure (15 psig) fermentation was evaluated as a means of increasing CO availability. Polyurethane foam packing material was selected for trickle bed solid support. Cell recycle fermentation on syngas operated for 3 months. Acetate was the primary product at pH 6.8. Trickle bed and gas lift fermentor designs were modified after initial water testing. Pervaporation system was constructed. No alcohol selectivity was shown with the existing membranes during initial start-up.

  3. Technical progress report for the magnetohydrodynamics Coal-Fired Flow Facility for the period April 1, 1993--June 30, 1993

    SciTech Connect

    Not Available

    1993-10-01

    In this quarterly technical progress report, UTSI reports on progress on a multitask contract to develop the necessary technology for the steam bottoming plant of the MHD Steam Combined Cycle power plant. A Proof-Of-Concept (POC) test was conducted during the quarter and the results are reported. This POC test was terminated after 88 hours of operation due to the failure of the coal pulverizer main shaft. Preparations for the test and post-test activities are summarized. Modifications made to the dry electrostatic precipitator (ESP) are described and measurements of its performance are reported. The baghouse performance is summarized, together with actions being taken to improve bag cleaning using reverse air. Data on the wet ESP performance is included at two operating conditions, including verification that it met State of Tennessee permit conditions for opacity with all the flow through it. The results of experiments to determine the effect of potassium seed on NO{sub x} emissions and secondary combustion are reported. The status of efforts to quantify the detailed mass balance for all POC testing is summarized. The work to develop a predictive ash deposition model is discussed and results compared with deposition actually encountered during the test. Plans to measure the kinetics of potassium and sulfur on flames like the secondary combustor, are included. Advanced diagnostic work by both UTSI and MSU is reported. Efforts to develop the technology for a high temperature air heater using ceramic tubes are summarized.

  4. Base program on energy related research. Quarterly technical progress report, August--October 1993

    SciTech Connect

    Not Available

    1993-12-31

    Progress reports are presented for the following area of studies: oil and gas; advanced systems applications; environmental technologies; and applied energy science. Oil and gas includes the following tasks: CROW{sup TM} process modeling; and miscible-immiscible gas injection processes. Advanced systems applications covers: development and optimization of a process for the production of a premium solid fuel from Western U.S. coals; development of an on-line alkali monitoring probe; optimization of the recycle oil process for Eastern oil shale; and process support and development. Tasks in the environmental technologies are: solid waste management; and remediation of contaminated soils. Applied energy science covers heavy oil/plastics co-processing.

  5. Electrostatic beneficiation of coal. Quarterly technical progress report, April 1--June 30, 1995

    SciTech Connect

    Mazumder, M.K.; Lindquist, D.; Tennal, K.B.

    1995-07-01

    A chamber has been set up for exposing ground coal to controlled relative humidities. Four levels in the range of 10% to 95% are planned. The change in moisture content of the coal powders will be determined after exposure. Charge to mass ratio acquired in tribocharging and the degree of electrostatic beneficiation will be determined as a function of the relative humidity used for each of the exposures. The authors also discuss their progress in grinding of the coal; the low percentage of coal recovered after separation and the possibility that these losses were a result of holdup in the expansion cone; the design and modeling of the electric curtain; particle size measurement using image processing; and the petrographic analyses of finely and coarsely ground Illinois No. 6 coal.

  6. Great basin paleoenvironmental studies project; Technical progress report first quarter (year 2), June--August 1994

    SciTech Connect

    1994-10-01

    The paleobiotic and geomorphic records are being examined for the local and regional impact of past climates to assess Yucca Mountain`s suitability as a high-level nuclear waste repository. The project includes botanical, faunal, and geomorphic components that will be integrated to accomplish this goal Progress reports are presented for: Paleobotenical studies in the Great Basin; Paleofaunas studies in the Great Basin; Geomorphology studies in the Great Basin; and Transportation. The goal of the transportation project is to compare the results from three models (FESWMS-2DH, DAMBRK, and FLO-2D) that have been suggested as appropriate for evaluating flood flows on alluvial fans with the results obtained from the traditional one-dimensional, stochastic model used in previous research performed by DRI for the Yucca Mountain Project.

  7. Electrostatic precipitation of condensed acid mist: Third quarterly technical progress report, March 1--May 31, 1989

    SciTech Connect

    Not Available

    1989-01-01

    Acid mists can sometimes constitute a significant portion of the total particulate emissions from power plants burning high-sulfur coals. A wet electrostatic precipitator (WESP) is the best control option for acid mist. The mist would blind a fabric filter and attack glass fiber fabrics. A wet ESP is required because the acid would quickly corrode the plates in a conventional dry ESP. The wet ESP also offers the advantages of no rapping reentrainment and no sensitivity to fly ash resistivity. The project is organized in two phases. Phase I, which is scheduled for September 1988 to September 1989, involves the WESP fabrication, laboratory and pilot combustor testing, and computer modeling. Phase II, which is scheduled for September 1989 to September 1990, involves the solicitation of a utility demonstration site, preliminary site measurements, and planning for the demonstration test program. Progress on Phase I work is addressed in this discussion. 5 refs., 4 figs.

  8. Accelerator research studies. Technical progress report, June 1, 1991--May 31, 1992

    SciTech Connect

    Not Available

    1992-02-01

    The Accelerator Research Studies program at the University of Maryland, sponsored by the Department of Energy under grant number DE-FG05-91ER40642, is currently in the first year of a three-year funding cycle. The program consists of the following three tasks: TASK A, Study of Transport and Longitudinal Compression of Intense, High-Brightness Beams, TASK B, Study of Collective Ion Acceleration by Intense Electron Beams and Pseudospark Produced High Brightness Electron Beams; TASK C, Study of a Gyroklystron High-power Microwave Source for Linear Colliders. In this report we document the progress that has been made during the past year for each of the three tasks.

  9. Technical support for open-cycle MHD program. Progress report, October-December 1979

    SciTech Connect

    Doss, E. D.

    1980-12-01

    The support program for open-cycle MHD at Argonne National Laboratory is developing the analytical tools needed to investigate the performance of the major components in the combined cycle MHD/steam power system. The analytical effort is centered on the primary components of the system that are unique to MHD and also on the integration of these analytical representations into a model of the entire power producing system. The present project activities include modeling of the combustor, MHD channel and diffuser, slag separator, radiant boiler and high-temperature air heater. In addition, these models are combined into a complete system model, which is, at present, capable of carrying out optimizations of the entire system relative to either thermodynamic efficiency or cost of electrical power. Progress is reported in detail.

  10. Methyl chloride via oxyhydrochlorination of methane. Quarterly technical progress report No. 10, January 1944--March 1994

    SciTech Connect

    1994-08-01

    In work related to the design and construction of the Process Development Unit (PDU) this quarter involved further detail design and a real start to the construction activities. Status updates are given below for each discipline in the Task 2.0 and 3.0 headings. This work is progressing well. with the caveat of several small slips in the scheduling. On the catalyst development front this quarter was extremely productive. Many catalyst screening experiments were completed and they showed that control of the reaction exotherm is going to be quite challenging under PDU conditions. The presence of much more efficient reactor design and the ability to maintain closer to isothermal conditions is expected to give a significant advantage in actual PDU operation. A major concern at the moment is the cost of La in the catalyst being used. An action plan to remedy this is being put together.

  11. Molecular biology of coal bio-desulfurization. Quarterly technical progress report, January 1--March 31, 1992

    SciTech Connect

    Young, K.D.; Gallagher, J.R.

    1992-04-30

    Genes cloned from Rhodococcus rhodochrous IGTS8 can transfer the DBT desulfurization phenotype to a different species (R. Fascians). The product was identified as 2-phenylphenol by gas chromatography. This result parallels the results we have previously reported for the activity of these genes in a DBT-negative mutant of IGTS8. Thus, the evidence is strong that we have identified and cloned the entire set of genes that are responsible for this very specific desulfurization reaction. Sequencing of these genes has commenced. A genomic library was constructed from the bacterium, Besulfovibrio desulfuricans. Screening has not yet identified a clone that carries the desulfurization genes from that organism. Two open reading frames, doxH and doxJ, in the C18 DBT degradation pathway were mutated and are now believed to be dispensable to that pathway. Finally, progress was made toward beginning to sequence the DBT dixoygenase genes from strain A15.

  12. Texas Experimental Tokamak: A plasma research facility. Technical progress report, November 1, 1993--October 31, 1994

    SciTech Connect

    Wootton, A.J.

    1994-07-01

    The purpose is to operate and maintain TEXT Upgrade as a complete facility for applied tokamak physics in order to elucidate the mechanisms of working gas, impurity, and thermal transport in tokamaks and in particular to understand the role of turbulence. So that they can continue to study the physics that is most relevant to the fusion program, TEXT completed a significant device upgrade this year. The new capabilities of the device and new and innovative diagnostics were exploited in all main program areas including: (1) configuration studies; (2) electron cyclotron heating physics; (3) improved confinement modes; (4) edge physics/impurity studies; (5) central turbulence and transport; and (6) transient transport. Details of the progress in each of the research areas are described.

  13. [Geothermal system temperature-depth database and model for data analysis]. 5. quarterly technical progress report

    SciTech Connect

    Blackwell, D.D.

    1998-04-25

    During this first quarter of the second year of the contract activity has involved several different tasks. The author has continued to work on three tasks most intensively during this quarter: the task of implementing the data base for geothermal system temperature-depth, the maintenance of the WWW site with the heat flow and gradient data base, and finally the development of a modeling capability for analysis of the geothermal system exploration data. The author has completed the task of developing a data base template for geothermal system temperature-depth data that can be used in conjunction with the regional data base that he had already developed and is now implementing it. Progress is described.

  14. Exploratory research on solvent refined coal liquefaction. Quarterly technical progress report, April 1-June 30, 1979

    SciTech Connect

    1980-07-01

    This report summarizes the progress of the Exploratory Research on Solvent Refined Coal Liquefaction project by The Pittsburgh and Midway Coal Mining Company's Merriam Laboratory for the period April 1, 1979 through June 30, 1979. Experimental work included a number of short residence time runs, but discussion of that work has been delayed until a later report. Experimental work reported focuses on an investigation of the decline in solvent quality experienced by the Wilsonville Pilot Plant during runs in support of the SRC I Demonstration Plant. A four run series was initiated with Wilsonville solvent; both the coal used at Wilsonville (Kentucky 6/11 - Pyro Mine) and Kentucky 9/14 coal from the Colonial Mine were used. The effect of pyrite addition to the Pyro Mine coal was investigated. No solvent quality or coking problems were experienced in the Merriam runs. Significant changes in solvent composition were apparent and equilibrated solvent samples were returned to Wilsonville for solvent quality testing.

  15. Energy-related business development grant project. Technical progress report, July 1-September 30, 1986

    SciTech Connect

    Not Available

    1986-01-01

    During the Third Quarter, the three Community Action Agencies (Arrowhead Economic Opportunity Agency, AEOA; Duluth Community Action Program, Incorporated, DCAP; Tri-Valley Opportunity Council, Incorporated, TVOC) involved in the Northern Minnesota Multi-Agency Energy Service Company Development Project made decisions regarding the feasibility of engaging in the particular energy-related business activities studied. Efforts to develop business plans and raise funds for start-up of the selected energy businesses are underway in all three agencies. Steady progress towards accomplishment of work program objectives was achieved in spite of significant conflict within and among the three agencies; adverse external factors complicated the situation further. A brief description of barriers, accomplishments and projected activities follows.

  16. Accelerator research studies. Technical progress report, June 1, 1992--May 31, 1993

    SciTech Connect

    Not Available

    1993-03-01

    The Accelerator Research Studies program at the University of Maryland, sponsored by the Department of Energy under grant number DE-FG05-91ER40642, is currently in the second year of a three-year funding cycle. The program consists of the following three tasks: TASK A, ``Study of Transport and Longitudinal Compression of Intense, High-Brightness Beams,`` (P.I., M. Reiser); TASK B, ``Study of Collective Ion Acceleration by Intense Electron Beams and Pseudospark Produced High Brightness Electron Beams,`` (Co-P.I.`s, W.W. Destler, M. Reiser, M.J. Rhee, and C.D. Striffler); TASK C, ``Study of a Gyroklystron High-Power Microwave Source for Linear Colliders,`` (Co-P.I.`s, V.L. Granatstein, W. Lawson, M. Reiser, and C.D. Striffler). In this report we document the progress that has been made during the past year for each of the three tasks.

  17. Innovative hybrid gas/electric chiller cogeneration. Quarterly technical progress report, April--June, 2000

    SciTech Connect

    Nowakowski, G.

    2000-07-01

    A meeting was held at Alturdyne's facility in San Diego to discuss project progress. Cliff Carpenter, the NETL Program Manager, attended the meeting. As a result of the meeting, several decisions were made: (1) A General Motors engine would be specified as the prime mover; (2) A Carrier reciprocating compressor would be specified, however a Hitachi screw compressor with an integral oil sump was an interesting candidate if it was available in the right size and for the right price; (3) The motor/generator would provide two functions: as an induction motor and as a synchronous generator. The variable speed, constant frequency feature will not be included in the first generation product; and (4) The refrigerant will be R134-A.

  18. Development of improved thermoelectric materials for space nuclear power systems. Sixth technical progress report, March 1985

    SciTech Connect

    Not Available

    1985-01-01

    The program consists of two main tasks encompassing (1) the development of an improved SiGe alloy and (2) the development of an as yet unspecified advanced material intended to have superior performance characteristics when compared to SiGe alloys. Significant progress was made toward the goal of producing a SiGe based material with an improved figure-of-merit during this reporting period. In these studies, a quantitative evaluation of the characteristics which produce the low thermal conductivities observed in SiGe alloys is being developed. Specific areas of emphasis include the effects of grain size, charge carrier and GaP concentrations. An alternate method for alloying with GaP was evaluated in which the GaP was added to SiGe during the melting operation.

  19. [Synchrotron studies of x-ray reflectivity from surfaces]. Technical progress report

    SciTech Connect

    Pershan, P.S.

    1992-03-03

    Following a long period of theoretical interest, but only limited measurements, there has recently been an increased number of attempts to expand the relative paucity of experimental information on the structure of liquid surfaces using techniques as diverse as ellipsometry, micro-force balances, non-linear optics, Auger and photoelectron spectroscopy, and x-ray scattering. Our group has played a leading role in the currently expanding application of scattering techniques to the general problem of characterizing the microscopic structure of liquid surfaces and we propose here that this work be extended specifically to liquid metals. In the following sections we will briefly describe the salient features of x-ray scattering that are relevant to the current project, the progress that we have made in the current grant period and the work that we propose to carry out in the forthcoming grant period.

  20. Low severity coal liquefaction promoted by cyclic olefins. Quarterly technical progress report, April--June 1996

    SciTech Connect

    Curtis, C.W.

    1997-12-31

    The goal of this research is to develop a methodology for analyzing the reactivity of cyclic olefins in situ in a high temperature and high pressure infrared cell. Cyclic olefins, such as 1,4,5,8-tetrahydronaphthalene (isotetralin) and 1,4,5,8,9,10-hexahydroanthracene (HHA), are highly reactive donor compounds that readily donate their hydrogen to coal and model acceptors when heated to temperatures of 200{degrees}C and above. These donors are active donors in the low severity liquefaction of coal at 350{degrees}C as shown in the research performed in this project. The infrared studies are being performed in a high temperature infrared cell that was obtained from AABSPEC. Modifications to that cell have been made and have been reported in previous progress reports.

  1. Advanced biomass research program. Annual report for 1987. Technical progress report

    SciTech Connect

    Smith, W.H.

    1989-01-01

    These results are from an interdisciplinary program researching plant growth and bioconversion processes for enhancing methane from biomass. Modern molecular and cellular biology approaches are being used to characterize the genes and to develop methods for accomplishing transformations to improve biomass quality by regulating plant chemicals. Quality is being emphasized since quantities of 25 Mg/ha can be sustained for five years and conditions for higher yields of some grasses were identified. Breeding has succeeded in the development of hexaploids that produce seeds, and vegetative propagation from tissue cultures for asexual species. Gel seeding of tissue culture derived plantlets inoculated with mycrohizal to improve survivability has shown promise. Biological methane potential assays have revealed the effects of harvesting frequency, storage and the proportion of plant parts on methane yields. Non-hydrolytical depolymerization of polypectate and hydrolytic degradation of cellulose occur more rapidly at near neutral pH's. A gene encoding for the xylan-degrading enzymes was isolated. These enzymes are repressed by glucose. Kinetic modeling of these reactions is progressing. Methods of describing the microbial community structure in digesters are being developed and used to monitor digester health and performance. Polyclonal antibodies for 9 methanogenic bacteria were developed, propionate and butyrate inhibited dissimilation of large organic polymers, the cellular location of key enzyme were revealed and cellulolytic bacteria were found to attack cells from inside the lumen. Controls of formate production and conversion to gas were identified and the genes for the hydrogenase enzymes in the conversions were cloned. System analysis allows the authors to assess the impact of research progress on cost factors. Sixty scientific papers reporting program results were published in 1987.

  2. High SO{sub 2} removal efficiency testing. Technical progress report

    SciTech Connect

    Blythe, G.

    1994-04-28

    The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades to be evaluated mostly involve using additives in the FGD systems. On the base program, testing was completed at the Tampa Electric Big Bend Station in November 1992. The upgrade option tested was DBA additive. For Option 1, at the Hoosier Energy Merom Station, three upgrade options have been tested: DBA additive, sodium formate additive, and high pH set point operation. Option 2 has involved testing at the Southwestern Electric Power Company Pirkey Station. Both sodium formate and DBA additives were tested as potential upgrade options at Pirkey. On Option 3, for testing at the PSI Energy Gibson Station, a DBA additive performance and consumption test was conducted in late February through mid-March 1994. Preliminary results from these tests are discussed in Section 3 of this progress report. Option 4 is for testing at the Duquesne Light Elrama Station. The FGD system employs magnesium-enhanced lime reagent and venturi absorber modules. An EPRI-funded model evaluation of potential upgrade options for this FGD system, along with a preliminary economic evaluation, determined that the most attractive upgrade options for this site were to increase thiosulfate ion concentrations in the FGD system liquor to lower oxidation percentages and increase liquid-phase sulfite alkalinity, and to increase the venturi absorber pressure drop to improve gas/liquid contacting. Parametric testing of these upgrade options was conducted in late March 1994. Preliminary results from these tests are also discussed in Section 3 of this progress report.

  3. Robotic weld overlay coatings for erosion control. Quarterly technical progress report, October 1994--December 1994

    SciTech Connect

    Levin, B.F.; Dupont, J.N.; Marder, A.R.

    1995-01-25

    Research is presently being conducted to develop a criteria for selecting weld overlay coatings for erosion mitigation in Circulated Fluidized Beds. Initially, eleven weld overlay alloys were selected for erosion testing based upon a literature review. All eleven coatings were deposited on 1018 steel substrates using the plasma arc welding process. Ten samples from each coating were prepared for erosion testing. The coating deposition and sample preparation procedures were described in the second quarterly report. All selected coatings were erosion tested at 400{degree}C and their erosion resistance was evaluated by determining the steady state erosion rate. In addition, the microstructure of each coating was characterized before and after the erosion tests. The results of the tests are discussed in the third quarterly report. No correlations were found between room temperature hardness of the weld overlay coatings and their erosion resistance at elevated temperature. During the last quarter tensile tests were performed at 400{degree}C for the Ultimet, Inconel-625, 316L SS, C-22, and Stellite-6 wrought alloys. The erosion tests for these materials at 400{degree}C are in progress. The results of mechanical and erosion tests will be used to correlate mechanical properties of selected wrought alloys such as tensile toughness, ductility, strain hardening coefficient and yield strength to their erosion resistance at 400{degree}C. Also, the erosion behavior of the wrought alloys compared with similar weld alloys will be analyzed. The experimental procedure and results of the tensile tests are presented in this progress report.

  4. A Trend Analysis of Manufacturing-Related Program Graduates of Community and Technical Colleges: Great Lakes and Plains Regions

    ERIC Educational Resources Information Center

    Eighmy, Myron A.

    2009-01-01

    Manufacturers in the United States are struggling to recruit and hire high-skilled workers needed to maintain productivity and to compete globally. While the total number employed in the manufacturing sector is shrinking, the demand for high-skilled workers has increased. Community and technical colleges have traditionally been an important source…

  5. A Trend Analysis of Manufacturing-Related Program Graduates of Community and Technical Colleges: Great Lakes and Plains Regions

    ERIC Educational Resources Information Center

    Eighmy, Myron A.

    2009-01-01

    Manufacturers in the United States are struggling to recruit and hire high-skilled workers needed to maintain productivity and to compete globally. While the total number employed in the manufacturing sector is shrinking, the demand for high-skilled workers has increased. Community and technical colleges have traditionally been an important source…

  6. Evaluation of an Experimental Re-introduction of Sockeye Salmon into Skaha Lake; Year 3 of 3, 2002 Technical Report.

    SciTech Connect

    Evelyn, Trevor; Lawrence, Shayla; Alexis, Fabian

    2003-05-01

    The Okanagan Nation Alliance in Canada and Colville Confederated Tribes in the U.S. have proposed re-introducing sockeye salmon to their historic range (Figure 1). The purpose of this project has been to assess the risks and benefits of an experimental sockeye re-introduction into Skaha Lake, by completing the following six objectives over three years: (1) Disease risk assessment; (2) Exotic fish risk assessment; (3) Inventory of sockeye salmon habitat and opportunities for habitat enhancement; (4) Development of a life-cycle model of sockeye, including interaction with resident kokanee; (5) Development of an experimental design and; (6) Finalization of a plan for re-introduction of sockeye salmon into Skaha Lake and associated monitoring programs. The following compilation of reports includes the third year of assessments for Objectives 1-3, the model design document for Objective 4, experimental design strategies for Objective 5 and a 2000-2003 project summary for Objective 6. For a full list of reports completed over the three years of the project, please refer to Table 1. The actual re-introduction and monitoring plan is currently being developed based upon options and strategies identified during the Year 3 analyses review workshop in March 2003. The information contained in this plan, as well as the information gathered from the re-introduction itself, will support future decisions on protection and restoration strategies for the Okanagan River sockeye stock.

  7. Biomass power for rural development. Technical progress report, April 1, 1997--June 30, 1997

    SciTech Connect

    Neuhauser, E.

    1997-08-01

    Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-H of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.

  8. Advanced thermally stable jet fuels: Technical progress report, July 1994--September 1994

    SciTech Connect

    Schobert, H.H.; Eser, S.; Song, C.; Hatcher, P.G.; Boehman, A.; Coleman, M.M.

    1994-07-01

    There are five tasks within this project on thermally stable coal-based jet fuels. Progress on each of the tasks is described. Task 1, Investigation of the quantitative degradation chemistry of fuels, has 3 subtasks which are described: Pyrolysis of n-alkylbenzenes; Thermal decomposition of n-tetradecane in near-critical region; and Re-examining the effects of reactant and inert gas pressure on tetradecane pyrolysis--Effect of cold volume in batch reactor. Under Task 2, Investigation of incipient deposition, the subtask reported is Uncertainty analysis on growth and deposition of particles during heating of coal-derived aviation gas turbine fuels; under Task 3, Investigation of the quantitative degradation chemistry of fuels, is subtask, Effects of high surface area activated carbon and decalin on thermal degradation of jet A-1 fuel and n-dodecane; under Task 4, Coal-based fuel stabilization studies, is subtask, Screening potential jet fuel stabilizers using the model compound dodecane; and under Task 5, Exploratory studies on the direct conversion of coal to high quality jet fuels, is subtask, Shape-selective naphthalene hydrogenation for production of thermally stable jet fuels. 25 refs., 64 figs., 22 tabs.

  9. Advanced converter technology. Technical progress report, May 23, 1979-May 22, 1980

    SciTech Connect

    Banic, C. V.; Eckhouse, S. A.; Kornbrust, F. J.; Lipman, K.; Peterson, J. L.; Rosati, R. W.

    1980-01-01

    The overall objective of this program is to define an advanced converter system employing 1980's technology in all subsystem and component areas for use in electrochemical energy storage systems. Additional experimental effort will validate elements of the advanced commutation circuitry on a full-scale breadboard basis. Improved models of battery electrical characteristics are beng defined and experimental apparatus is being designed to measure these characteristics and to enable better definition of the battery-power conditioner interface. Improvement of energy-storage system performance through modification of battery converter characteristics will also be investigated. During this first year of the contract, a new more advanced concept for power conditioning based on a concept defined by United Technologies Corporation for fuel cell use was evaluated. This high switching frequency concept has the potential for significantly reducing the size and cost of battery plant power conditioners. As a result, the Department of Energy authorized redirection of the program to first evaluate this new concept and then to reorient the program to adopt this concept as the primary one. Progress is reported. (WHK)

  10. Capillary electrokinetic separations with optical detection. Technical progress report, February 1, 1993--January 31, 1994

    SciTech Connect

    Sepaniak, M.J.

    1993-10-01

    This program seeks the development of capillary electrokinetic separation techniques and associated optical methods of detection. Fundamental studies of pertinent separation and band broadening mechanisms are being conducted, with the emphasis on understanding systems that include highly-ordered assemblies as running buffer additives. The additives include cyclodextrins, affinity reagents, and soluble (entangled) polymers and are employed with capillary electrophoresis, CE and/or micellar electrokinetic capillary chromatography, MECC modes of separation. The utility of molecular modeling techniques for predicting the effects of highly ordered assemblies on the retention behavior of isomeric compounds is under investigation. The feasibility of performing separations using a non-aqueous solvent/fullerene electrochromatographic system is being explored. The analytical methodologies associated with these capillary separation techniques are being advanced through the development of retention programming instumentation/techniques and new strategies for performing optical detection. The advantages of laser fluorimetry are extended through the inclusion of fluorogenic, reagents in the running buffer. These reagents include oligonucleotide intercalation reagents for detecting DNA fragments. Chemiluminescence detection using post-capillary reactors/flow cells is also in progress. Successful development of these separation and detection systems will fill current voids in the capabilities of capillary separation techniques.

  11. Great Basin paleoenvironmental studies project; Technical progress report: Fourth quarter, March--May, 1994

    SciTech Connect

    1994-07-01

    Examination of the paleoenvironmental and geomorphic records to determine the local and regional impact of past climates will advance the assessment of Yucca Mountain`s suitability as a high-level nuclear waste repository. Paleobotanical studies will reconstruct the response of vegetation to climate change at the community and the organismal levels in order to identify periods of mesic climate at Yucca Mountain and the adjacent region during the last 20,000 to 50,000 years. Constructing a history of Great Basin vertebrates, particularly mammals, will provide empirical evidence of past environmental and climatic conditions within the Great Basin. The objective of the geomorphology component of the program is to document the responses of surficial processes and landforms to the climatic changes documented by studies of packrat middens, pollens, and faunal distributions. The goal of the transportation component is to compare the results from three models (FESWMS-2DH, DAMBRK, and FLO-2D) that have been suggested as appropriate for evaluating flood flows on alluvial fans with the results obtained from the traditional one-dimensional, stochastic model used in previous research for the Yucca Mountain Project. Progress on all these tasks is described.

  12. Coolside waste management research. Quarterly technical progress report, July 1, 1992--September 30, 1992

    SciTech Connect

    Not Available

    1992-12-31

    TCLP analysis of the Coolside pellets and Ottawa base sand materials were completed. The metal concentrations for the 8 RCRA metals were well below the trigger values with all but Ag and Se being below the drinking water standard levels. The initial and final pH values showed the sand had essentially no neutralization capacity while the neutralization capacity of the pilot plant materials was above the 0.7 meq/g upper level for use of extraction solution {number_sign}1 but well below the 2 meq/g upper level of the {number_sign}2 solution neutralization capacity. Complete metals analysis in addition to the RCRA metals are also reported. Complete metals, proximate, and ultimate analyses for the pilot plant test samples were completed. Sizable concentrations of calcium well above the Coolside samples were observed. Interpretation of these results are in progress. Monitoring of swell on Coolside solid waste samples compacted in CBR molds continued with no increase in swell being observed since the last reporting period. The permeability of a specimen remolded near 95% of standard dry density and optimum moisture content and aged at room temperature for 178 days was 1.72 {times} 10{sup {minus}6} cm/sec.

  13. Technical progress report during Phase 1 of the continuous fiber ceramic composites program

    SciTech Connect

    Richerson, D.W.

    1994-03-15

    United States industry has a critical need for materials that are lightweight, strong, tough, corrosion resistant and capable of performing at high temperatures; such materials will enable substantial increase in energy efficiency and reduction in emissions of pollutants. Continuous fiber ceramic composites (CFCCs) are an emerging class of materials which have the potential for the desired combination of properties to meet the industrial needs. A $10 billion annual market has been estimated for CFCC products by the year 2010, which equates to over 100,000 industrial sector jobs. The CFCC program began in the spring of 1992 as a three-phase 10-year effort to assess potential applications of CFCC materials, develop the necessary supporting technologies to design, analyze and test CFCC materials, conduct materials and process development guided by the applications assessment input, fabricate test samples and representative components to evaluate CFCC material capabilities under application conditions, and analyze scaleability and manufacturability plus demonstrate pilot-scale production engineering. DOE awarded 10 Phase I cooperative agreements to industry-lead teams plus identified generic supporting technology projects. This document highlights the broad progress and accomplishments on these contracts and support technology projects during Phase I.

  14. Exploratory research on solvent refined coal liquefaction. Annual technical progress report, January 1-December 31, 1979

    SciTech Connect

    1980-09-01

    This report summarizes the progress of the Exploratory Research on Solvent Refined Coal Liquefaction project by The Pittsburg and Midway Coal Mining Co.'s Merriam Laboratory during 1979. In a series of experiments with varying feed gas composition, low levels (5 to 10 mole %) of carbon monoxide had little effect on the SRC II processing of Pittsburgh Seam coal (Powhatan No. 5 Mine) while higher levels (20 to 40 mole %) resulted in a general degradation of operability and reduced oil yields. Addition of finely divided (approx. 1 ..mu..m) pyrite to the reactive Powhatan coal had little effect on oil yields although the molecular weight of the distillation residue was apparently decreased. When finely divided pyrite and magnetite were added to the less reactive coals from the Loveridge and Blacksville No. 1 Mines (also Pittsburgh Seam), however, substantial increases in oil yields and product quality were obtained. In a comparison of upflow and downflow dissolver configurations with Powhatan coal in the SRC II mode, there was no difference in yields or product quality. A study characterizing specific reactors revealed a significantly higher conversion in the SRC I mode with a reactor approximating plug flow conditions compared to a completely backmixed reactor. In the SRC II mode there was only a slightly higher oil yield with the plug flow reactor.

  15. Plasma physics research. Technical progress report, 1 February 1979-30 September 1980

    SciTech Connect

    1980-01-01

    Progress during the 20-month period, Feburary 1, 1979 to September 30, 1980 on the University of Wisconsin Plasma Physics contract is described. Most of the work centers around two large experimental devices, the Levitated Octupole and Tokapole II. A major upgrade of the Octupole was begun to include 1.8 MW of neutral beam heating and 2 MW of ICRH. Meanwhile, gun optimization and low field operation has resulted in the attainment of 35% beta, a factor of 9 above the single fluid ballooning limit. The Tokapole has operated reliably for the past two years and has been used to study axisymmetric instability of dee, inverse dee, and square shaped plasmas. Low q (approx. 0.6) discharges with flat current profiles are obtained. ICRF heating studies were brought to a conclusion. The device is presently being used to study Alfven wave heating, ECRH startup, poloidal ohmic heating, and plasma ohmic heating, and plasma surface interactions. Smaller efforts on divertor simulation and plasma potential studies in a single ring device and plasma theory are also described.

  16. Methyl chloride via oxyhydrochlorination of methane. Quarterly technical progress report No. 16, July 1995--September 1995

    SciTech Connect

    1996-03-01

    Continuous progress is being made toward the contract objectives in our attempt to produce {open_quotes}Methyl Chloride via Oxyhydrochlorination of Methane.{close_quotes} Specifically, gains have been achieved in Task 1.0 Catalyst Development and Separation Unit Operation Development and Task 4.0 PDU Startup. Catalyst development continued forward to examine the copper, lanthanum, and lithium loadings as well as support surface area in four factor, two level, fully crossed design experiments carried out at five temperatures between 290{degrees}C and 310{degrees}C. Eight of the sixteen runs have been completed. Evaluation of these runs as a three factor, two level, fully crossed experiment has yielded some useful information. The choice of the Cu/La/Li metals system has been confirmed, and the high Cu, low La, low Li system hasn`t proven itself to be the most active at this point. Chemical feeds were brought on-line to the PDU. Small amounts of methyl chloride were made before the system was shut down due to equipment failure. Glass-lined equipment was found to be failing due to chemical etching. Replacement equipment with other materials of construction have been ordered. In addition, the FTIR windows clouded soon after chemical feeds were started. This materials problem is also being investigated.

  17. Solvent Refined Coal (SRC) process. Quarterly technical progress report, January 1979-March 1979

    SciTech Connect

    Not Available

    1980-02-01

    This report summarizes the progress of the Solvent Refined Coal (SRC) Project by the Pittsburg and Midway Coal Mining Co. for the Department of Energy for the period January 1, 1979 to March 31, 1979. Activities included the operation and modification of the Solvent Refined Coal Pilot Plant at Fort Lewis, Washington; the Process Development Unit P-99 at Harmarville, Pennsylvania; and research at Merriam Laboratory in Merriam, Kansas. The Pilot Plant processed Powhatan No. 5 Coal in the SRC-II mode of operation studying the effect of coal particle size and system temperature on coal slurry blending and the effect of carbon monoxide concentration in the reaction feed gas on process yields. January and February were spent completing installation of a fourth High Pressure Separator on Process Development Unit P-99 to better simulate operating conditions for the proposed Demonstration Plant. During March, one run was completed at P-99 feeding Pittsburgh Seam Coal from the Powhatan No. 5 Mine. Merriam investigations included a study of the effect of iron containing additives on SRC-I operation, the addition of carbon monoxide to the feed gas, utilization of a hydrogenated solvent (Cresap process solvent) in the SRC-I mode under both normal and short residence time operating conditions, and development of a simulated distillation technique to determine the entire boiling range distribution of product oils.

  18. Biomass power for rural development. Technical progress report, January 1, 1997--March 31, 1997

    SciTech Connect

    Neuhauser, E.

    1997-08-01

    Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-II of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.

  19. Experimental studies of elementary particle interactions at high energies. Summary technical progress report

    SciTech Connect

    1992-03-31

    This is a report of the research activities of the Experimental High Energy Physics group of The Rockefeller University. As this is an annual progress report, the emphasis is on last year`s research activities. However, since it is the last of a series of 5 such reports to be submitted to the DOE under the present 5 year contract, an effort has been made to provide comprehensive coverage of the research activities of the group throughout the contract period. In the past 5 years, the research program encompassed three major areas: the UA-6 experiment at CERN, the CDF experiment at Fermilab, and several SSC projects. The UA-6 experiment studies direct-{gamma} and J/{Psi} production in pp and {bar p}p interactions at {radical}s = 22.5 GeV.4. In the CDFF experiment the authors have concentrated in the area of small angle physics, where the objective has been to measure the elastic, diffractive and total cross sections, and to provide an absolute calibration of the machine luminosity. The SSC research projects related to two experiments: The Solenoidal Detector Collaboration and the ``low p{sub T} physics`` experiment.

  20. Solvent Refined Coal (SRC) process. Quarterly technical progress report, April 1979-June 1979

    SciTech Connect

    Not Available

    1980-02-01

    This report summarizes the progress of the Solvent Refined Coal (SRC) Project for the period March 25, 1979, through June 24, 1979. SRC-I turnaround activities at the Fort Lewis Pilot Plant and several other problems delayed successful startup until April 11. Slurry was injected to the Lummus Deashing Unit for the first time April 12. After approximately eight days, slurry feed was diverted because of indications that solids were accumulating in the settler vessel. The Fort Lewis Pilot Plant was shut down from April 28 to May 12, 1979, while the Lummus Unit settler vessel was hydroblasted. Cleaning of the settler vessel was complete May 10. Modifications to the unit were nearly complete at the end of the reporting period. Slurry feed to the Lummus Unit was reestablished June 15. To date, continuous production of specification product at design rates has not been achieved. One material balance run, MBR 79-1, was completed using Kentucky No. 9/14 coal at proposed design conditions for the SRC-I Demonstration Plant. Process Development Unit P-99 was on-stream for all of the second quarter of 1979, with the exception of a two-week scheduled turn-around. Six different run conditions were tested feeding Pittsburgh Seam coal from the Powhatan No. 5 Mine.

  1. NO decomposition in non-reducing atmospheres. Technical progress report, December 1995--February 1996

    SciTech Connect

    Klier, K.; Herman, R.G.; Dedecek, J.

    1996-03-01

    The preparation of Co(II) ion exchanged zeolites was described in the previous quarterly progress report, and NO adsorption/desorption studies with these zeolites have now been carried out, especially with ZSM-5 and erionite zeolites. Diffuse reflectance spectroscopy was utilized to monitor the spectral changes that occurred during adsorption of NO on the Co(II) cations, which was observed to occur after dehydration treatments at 350{degrees}C and 525{degrees}C. Absorption bands in the charge transfer spectral region of NO-Co intrazeolitic complexes depended mainly on Co siting in the zeolites. Catalytic testing of NO decomposition and NO reduction by methane was carried out. It was observed that Co-mordenite and Co-A zeolite exhibited low, but stable, activity in NO decomposition. For NO reduction by methane in the presence of excess oxygen, Co-mordenite and Co-ferrierite exhibited the highest %NO converted to products and selectivity toward N{sub 2} formation, but Co-A zeolite and Co-erionite yielded the highest selectivities to NO{sub 2} formation. Co-ZSM-5 zeolite exhibited an intermediate behavior.

  2. Progress in digestive endoscopy: Flexible Spectral Imaging Colour Enhancement (FICE)-technical review

    PubMed Central

    Negreanu, L; Preda, CM; Ionescu, D; Ferechide, D

    2015-01-01

    Background. A substantial advance in digestive endoscopy that has been made during the last decade is represented by digital chromoendoscopy, which was developed as a quicker and sometimes better alternative to the gold standard of dye spraying. Fujifilm developed a virtual coloration technique called Flexible spectral Imaging Color Enhancement (FICE). FICE provides a better detection of lesions of “minimal” esophagitis, of dysplasia in Barrett’s esophagus and of squamous cell esophageal cancer. The use of FICE resulted in an improvement in the visualization of the early gastric cancer, being less invasive, and time consuming than the classic dye methods. Current evidence does not support FICE for screening purposes in colon cancer but it definitely improves characterization of colonic lesions. Its use in inflammatory bowel disease is still controversial and in video capsule endoscopy is considered a substantial progress. Conclusions. The use of FICE endoscopy in routine clinical practice can increase the diagnostic yield and can provide a better characterization of lesions. Future studies to validate its use, the good choice of channels, and the “perfect indications” and to provide common definitions and classifications are necessary. PMID:26664462

  3. Supramolecular structures for photochemical energy conversion. Technical progress report, 1993--1996

    SciTech Connect

    1996-06-01

    This research project is concerned with the design, synthesis and study by photochemical and spectroscopic methods of complex molecular devices that mimic some important aspects of photosynthetic electron and energy transfer. Properly engineered molecules of this type can functionally mimic photosynthetic light harvesting (singlet-singlet energy transfer between chromophores), photoprotection from light-initiated singlet oxygen damage (triplet-triplet energy transfer from chlorophylls to carotenoid polyenes), and, most importantly, photoinduced multistep electron transfer to generate charge-separated states that preserve some of the photon energy as chemical potential. During the last three years, progress has been made on several fronts, all of which are related to the overall goal. A biomimetic system based on carotenoid-porphyrin-quinone triads has been constructed that demonstrates photoinduced transmembrane charge separation which in turn drives transmembrane proton transfer. Another investigation has focused on the use of proton transfer reactions to stabilize the initial products of photoinduced electron transfer and thereby increase the yield of long-lived charge separation. A third study has investigated the influence of rigid molecular geometries and short donor-acceptor separations on photoinduced electron transfer reactions. Finally, generation and quenching of singlet molecular oxygen by chlorophyll aggregates has been studied. All four studies are described and results are discussed.

  4. Diffraction studies of the structure of glasses and liquids: Technical progress report

    SciTech Connect

    Moss, S.C.

    1989-01-01

    The Houston program on glasses and liquids has continued over the year with an expanded activity into vitreous TiO/sub 2/ and amorphous metals/quasicrystals. The modeling study of vitreous SiO/sub 2/ has been published and the study of amorphous melanin is well underway in-house. We have also begun some promising modeling work on the icosahedral glass model (IGM) for quasicrystals and have completed a preliminary study of epitaxial diamond crystal growth on the (111) silicon crystal surface (initially undertaken to study the expected ''amorphous'' diamond-like phase). The work on GLAD at the Argonne IPNS continues on schedule under the direction of Dr. David L. Price. The status of the Phase I instrument has been published and the Phase II development is underway with an evacuated flight path, additional detectors and a final data acquisition system in progress. It is our expectation that the final instrument will be the most advanced of its kind in the world for the study of a wide variety of problems in glasses, liquids and amorphous materials.

  5. 1992 Technical progress report of the University of South Carolina`s High Energy Physics Group

    SciTech Connect

    1992-12-31

    The high energy physics group at the University of South Carolina includes five teaching faculty members, one research faculty member, and five graduate students. Professors Childers and Darden devote most of their research effort to Fermilab experiment E789, which is designed to observe charmless two-body decays of b-flavored mesons and baryons. Prof. Wilson works on E789 and also on Fermilab experiment E687 which studies charm physics in the wide-band photon beam. Professors Rosenfeld and Wang participate in the AMY collaboration, which studies electron-positron interactions using the TRISTAN collider at KEK. Prof. Rosenfeld and one student collaborate with personnel from KEK and INS, Tokyo, on an experiment to detect a 17 keV neutrino in the {beta}-decay spectrum of {sup 63}Ni. Profs. Avignone and Rosenfeld are charter members of Fermilab proposal P803, which will search for the oscillation of muon neutrino to tau neutrino with sensitivity better than a factor of 40 than previously achieved. A brief discussion on the progress of each program is given.

  6. Spectroscopy, reaction, and photodissociation in highly vibrationally excited molecules. Technical progress report

    SciTech Connect

    Not Available

    1991-12-31

    Highly vibrationally excited molecules often control the course of chemical reactions in the atmosphere, combustion, plasmas, and many other environments. The research described in this Progress Report uses laser excitation and interrogation techniques to study and control the dynamics of highly vibrationally excited molecules. In particular, they show that it is possible to unravel the details and influence the course of photodissociation and bimolecular reaction. The experiments use laser excitation of overtone vibrations to prepare highly vibrationally excited molecules, frequently with single quantum state resolution, and laser spectroscopy to monitor the subsequent behavior of the excited molecule. We have studied the vibrationally mediated photodissociation and the bond- and state-selected bimolecular reaction of highly vibrationally excited molecules. In the first process, one photon creates a highly excited molecule, a second photon from another laser dissociates it, and light from a third laser detects the population of individual product quantum states. This approach allows us to explore otherwise inaccessible regions of the ground and excited state potential energy surface and, by exciting to the proper regions of the surface, to control the breaking of a selected chemical bond. In the second process, the highly vibrationally excited molecule reacts with an atom formed either in a microwave discharge or by photolysis and another laser interrogates the products. We have used this approach to demonstrate mode- and bond-selected bimolecular reactions in which the initial excitation controls the subsequent chemistry. 30 refs., 8 figs.

  7. TECHNICAL PROGRESS REPORT FOR UTSI/CFFF MHD PROGRAM COMPLETION AND RELATED ACTIVITIES

    SciTech Connect

    DR. JAMES N. CHAPMAN; DR. JOEL W. MUEHLHAUSER

    1998-10-23

    Routine preventive maintenance of the DOE Coal Fired Flow Facility (CFFF) is being performed. Modernization programs, funded under subcontract from Foster Wheeler Development Corporation by the DOE HIPPS Program, have been completed on the coal processing system, the data acquisition and control system and the control room. Late in the quarter, all work was stopped on maintenance of the CFFF at DOE instruction. Environmental restoration actions continued with monitoring of groundwater wells and holding pond effluent. Progress is reported on the approved groundwater remediation plan. Actions are underway to dispose of spent seed/ash mixtures and excess coal remaining from the MHD POC program. The status of five (5) High Temperature Superconductor (HTS) projects is reported. A summary is included of the results attained with sol-gel experiments with buffer layers and YBCO. The status of the cost/performance study of electron beam and PLD deposition is pre-sented. A summary of work performed in diagnostics for real time control of HTS processes is presented.

  8. MHD Coal Fired Flow Facility. Quarterly technical progress report, July-September 1980

    SciTech Connect

    Altstatt, M. C.; Attig, R. C.; Brosnan, D. A.

    1980-11-01

    Significant activity, task status, planned research, testing, development, and conclusions for the Magnetohydrodynamics (MHD) Coal-Fired Flow Facility (CFFF) and the Energy Conversion Facility (ECF) are described. On Task 1, the first phase of the downstream quench system was completed. On Task 2, all three combustor sections were completed, hydrotested, ASME code stamped, and delivered to UTSI. The nozzle was also delivered. Fabrication of support stands and cooling water manifolds for the combustor and vitiation heater were completed, heat transfer and thermal stress analysis, along with design development, were conducted on the generator and radiant furnace and secondary combustor installation progressed as planned. Under Task 3 an Elemental Analyzer and Atomic Absorption Spectrophotometer/Graphite Furnace were received and installed, sites were prepared for two air monitoring stations, phytoplankton analysis began, and foliage and soil sampling was conducted using all study plots. Some 288 soil samples were combined to make 72 samples which were analyzed. Also, approval was granted to dispose of MHD flyash and slag at the Franklin County landfill. Task 4 effort consisted of completing all component test plans, and establishing the capability of displaying experimental data in graphical format. Under Task 7, a preliminary testing program for critical monitoring of the local current and voltage non-uniformities in the generator electrodes was outlined, electrode metal wear characteristics were documented, boron nitride/refrasil composite interelectrode sealing was improved, and several refractories for downstream MHD applications were evaluated with promising results.

  9. Great Basin paleoenvironmental studies project; Technical progress report, second quarter, September--November, 1993

    SciTech Connect

    1993-12-31

    Progress is described in the four tasks associated with this project. Task 1, Paleobotanical studies in the Great Basin, has as its objective the reconstruction of the response of vegetation to climate in order to identify periods of mesic climate at Yucca Mountain during the last 20,000 to 50,000 years. Past extremes in infiltration rates are expected to serve as estimates of climate that may be expected during the next 10,000 years at Yucca Mtn. Task 2, Paleofaunas, will construct a history of Great Basin vertebrates that will provide empirical evidence of past environmental and climatic conditions. The objective of Task 3, Geomorphology, is to document the responses of surficial processes and landforms to the climatic changes documented by studies of packrat middens, pollen, and faunal distributions. The goal of Task 4, Transportation, is to compare the results from three models that have been suggested as appropriate for evaluating flood flows on alluvial fans with the results obtained from the traditional one-dimensional, stochastic model used in previous research for Yucca Mountain. This research looked at three alluvial fans with rail transportation alignments crossing them.

  10. Methyl chloride via oxyhydrochlorination of methane. Quarterly technical progress report No. 7, April--June 1993

    SciTech Connect

    Not Available

    1994-01-01

    The purpose of this contract is to develop a process for converting light alkane gases to methyl chloride via oxyhydrochlorination using highly selective, stable catalysts in fixed-bed reactors designed to remove the large amount of heat generated, so as to control the reaction temperature. Further, the objective is to obtain the engineering data base necessary for developing a commercially feasible process and to evaluate the economics of the process. Several key technology areas were evaluated this quarter. The catalyst definition effort focused on the determination of the role of the Li and La promoters that have been found to be useful in enhancing Cu based oxyhydrochlorination of methane catalysts. Initial experiments show that the La acts to provide a much more active catalyst than the Cu only case. The role of the Li is ambiguous at this point. The Li enhances the stability of the La promoted catalyst, but gives only marginal improvement by itself This work will be continued, with additional emphasis on the analysis of the catalysts to determine the structural role that the promoters may play. The separation unit operation definition made significant progress by demonstrating in a laboratory system that a process solvent may be used to remove the product CH{sub 3}Cl from the reactor effluent stream. To date the data has been qualitative, but clear. Work will continue to gather the information possible in the laboratory to help with PDU design. An extensive amount of testing was performed on the chosen process solvent, Multitherm. A comprehensive review of all the thermal testing and associated FTIR, UV/VIS, and physical property testing is included in this report. This work shows that Multitherm should give the desired stability and solubility that are necessary to make the separation unit operation successful.

  11. Improved methods for water shutoff. Final technical progress report, October 1, 1997--September 30, 1998

    SciTech Connect

    Seright, R.S.; Liang, J.T.; Schrader, R.; Hagstrom, J. II; Liu, J.; Wavrik, K.

    1998-10-01

    In the United States, more than 20 billion barrels of salt water are produced each year during oilfield operations. A tremendous economic incentive exists to reduce water production if that can be accomplished without significantly sacrificing hydrocarbon production. This three-year research project had three objectives. The first objective was to identify chemical blocking agents that will (a) during placement, flow readily through fractures without penetrating significantly into porous rock and with screening out or developing excessive pressure gradients and (b) at a predictable and controllable time, become immobile and resistant breakdown upon exposure to moderate to high pressure gradients. The second objective was to identify schemes that optimize placement of the above blocking agents. The third objective was to explain why gels and other chemical blocking agents reduce permeability to one phase (e.g., water) more than that to another phase (e.g., oil or gas). The authors also wanted to identify conditions that maximize this phenomenon. This project consisted of three tasks, each of which addressed one of the above objectives. This report describes work performed during the third and final period of the project. During this three-year project, they: (1) Developed a procedure and software for sizing gelant treatments in hydraulically fractured production wells; (2) Developed a method (based on interwell tracer results) to determine the potential for applying gel treatments in naturally fractured reservoirs; (3) Characterized gel properties during extrusion through fractures; (4) Developed a method to predict gel placement in naturally fractured reservoirs; (5) Made progress in elucidating the mechanism for why some gels can reduce permeability to water more than that to oil; (6) Demonstrated the limitations of using water/oil ratio diagnostic plots to distinguish between channeling and coning; and (7) Proposed a philosophy for diagnosing and attacking water

  12. Technical Progress Report on Single Pass Flow Through Tests of Ceramic Waste Forms for Plutonium Immobilization

    SciTech Connect

    Zhao, P.; Roberts, S.; Bourcier, W.L.

    2000-12-03

    This report updates work on measurements of the dissolution rates of single-phase and multi-phase ceramic waste forms in flow-through reactors at Lawrence Livermore National Laboratory. Previous results were reported in Bourcier (1999). Two types of tests are in progress: (1) tests of baseline pyrochlore-based multiphase ceramics; and (2) tests of single-phase pyrochlore, zirconolite, and brannerite (the three phases that will contain most of the actinides). Tests of the multi-phase material are all being run at 25 C. The single-phase tests are being run at 25, 50, and 75 C. All tests are being performed at ambient pressure. The as-made bulk compositions of the ceramics are given in Table 1. The single pass flow-through test procedure [Knauss, 1986 No.140] allows the powdered ceramic to react with pH buffer solutions traveling upward vertically through the powder. Gentle rocking during the course of the experiment keeps the powder suspended and avoids clumping, and allows the system to behave as a continuously stirred reactor. For each test, a cell is loaded with approximately one gram of the appropriate size fraction of powdered ceramic and reacted with a buffer solution of the desired pH. The buffer solution compositions are given in Table 2. All the ceramics tested were cold pressed and sintered at 1350 C in air, except brannerite, which was sintered at 1350 C in a CO/CO{sub 2} gas mixture. They were then crushed, sieved, rinsed repeatedly in alcohol and distilled water, and the desired particle size fraction collected for the single pass flow-through tests (SPFT). The surface area of the ceramics measured by BET ranged from 0.1-0.35 m{sup 2}/g. The measured surface area values, average particle size, and sample weights for each ceramic test are given in the Appendices.

  13. Technical Progress Report on Single Pass Flow Through Tests of Ceramic Waste Forms for Plutonium Immobilization

    SciTech Connect

    Zhao, P; Roberts, S; Bourcier, W

    2000-12-01

    This report updates work on measurements of the dissolution rates of single-phase and multi-phase ceramic waste forms in flow-through reactors at Lawrence Livermore National Laboratory. Previous results were reported in Bourcier (1999). Two types of tests are in progress: (1) tests of baseline pyrochlore-based multiphase ceramics; and (2) tests of single-phase pyrochlore, zirconolite, and brannerite (the three phases that will contain most of the actinides). Tests of the multi-phase material are all being run at 25 C. The single-phase tests are being run at 25, 50, and 75 C. All tests are being performed at ambient pressure. The as-made bulk compositions of the ceramics are given in Table 1. The single pass flow-through test procedure [Knauss, 1986 No.140] allows the powdered ceramic to react with pH buffer solutions traveling upward vertically through the powder. Gentle rocking during the course of the experiment keeps the powder suspended and avoids clumping, and allows the system to behave as a continuously stirred reactor. For each test, a cell is loaded with approximately one gram of the appropriate size fraction of powdered ceramic and reacted with a buffer solution of the desired pH. The buffer solution compositions are given in Table 2. All the ceramics tested were cold pressed and sintered at 1350 C in air, except brannerite, which was sintered at 1350 C in a CO/CO{sub 2} gas mixture. They were then crushed, sieved, rinsed repeatedly in alcohol and distilled water, and the desired particle size fraction collected for the single pass flow-through tests (SPFT). The surface area of the ceramics measured by BET ranged from 0.1-0.35 m{sup 2}/g. The measured surface area values, average particle size, and sample weights for each ceramic test are given in the Appendices.

  14. Surface properties of photo-oxidized bituminous coals. Technical progress report, January--March 1996

    SciTech Connect

    Mitchell, G.; Davis, A.; Chander, S.

    1996-12-31

    During this report period, a vitrinite concentrate from the mvb Splash Dam seam (DECS-30) was prepared and analyzed. Results show that the concentrate was 91 vol % vitrinite and that the sample has been adequately protected from oxidation under refrigerated storage in argon. The 9% level of contamination within the vitrinite resulted from the extreme friability of the coal and to the dispersion of fine grains of semifusinite and micrinite. Polished blocks containing vitrain bands that were prepared, irradiated in blue-light and employed in contact angle measurements were evaluated using specular reflectance-mode FT-IR for changes in functional group chemistry. Infrared spectra from unexposed areas of vitrinite and those irradiated for 1, 5 and 10 min for six coals ranging in rank from hvCb to mvb were obtained using a FTS 175 spectrometer with a Bio-Rad UMA 500 microscope accessory. Preliminary results demonstrate that photo-oxidation occurred during irradiation, becoming progressively more intense with increasing irradiation time; however, the magnitude of this change diminished with increasing rank. A relatively steady increase in the carbonyl region (1,800--1,650 cm{sup {minus}1}) and a decrease in the aliphatic region (2,950--2,850 cm{sup {minus}1}) of the spectra supports this observation and is similar to observations made in the past for natural weathering and laboratory oxidation of coals. A series of tests was initiated to photo-oxidize powdered vitrains using the BLAK-RAY ultraviolet lamp evaluated last quarter. Samples of four vitrinite concentrates were exposed to UV light for 10 mins per side. These and the corresponding whole-seam channel samples and raw vitrinite concentrates were submitted for initial microflotation tests which have not been completed at this time.

  15. (Pittsburgh Energy Technology Center): Quarterly technical progress report for the period ending March 31, 1986

    SciTech Connect

    Not Available

    1986-11-01

    Significant progress in catalytic technology was made. Union Carbide researchers discovered a new ruthenium-containing catalyst system that converts methanol to ethanol upon reaction with syngas at relatively low pressures and temperatures. The reduced reaction pressure is a major breakthrough in methanol homologation technology. Chevron Research Co. issued Interim Report No. 12 on the refining and upgrading of oils produced from Wyodak and Illinois coals by the Lummus Crest Integrated Two-Stage Liquefaction Process. This process produces high-density fuel products that have shown potential as jet fuels. Interest in development of high-density fuel and fuel products was reinforced when DOE/Air Force, DOE HQ, and PETC representatives met to discuss a program to assess the feasibility of producing jet fuel from coal-derived materials from commercial-scale synfuels plants. PETC will implement the program for the Department of Defense through an interagency agreement. Another important area of coal-research activity involves the development of flue gas cleanup technology. Successful operation of the NOXSO Flue Gas Treatment Process at a scale equivalent to the generation of 0.75 MW of electricity has demonstrated that the simultaneous removal of 95% of the SO/sub 2/ and 87% of the NO/sub x/ in the flue gas can be obtained. Hydrocarbon Research, Inc., submitted two reports following the completion of its two-year test program designed to investigate the use of a cascade-catalyst system to reduce overall product cost. PETC's coal preparation researchers recently completed a 30-test evaluation of some of the operating parameters of a heavy-liquid cyclone process. PETC's projects involving international cooperation are discussed in some detail.

  16. Advanced thermally stable jet fuels: Technical progress report, October 1994--December 1994

    SciTech Connect

    Schobert, H.H.; Eser, S.; Song, C.; Hatcher, P.G.; Boehman, A.; Coleman, M.M.

    1995-02-01

    There are five tasks within this project on thermally stable coal-based jet fuels. Progress on each of the tasks is described. Task 1, Investigation of the quantitative degradation chemistry of fuels, has 5 subtasks which are described: Literature review on thermal stability of jet fuels; Pyrolytic and catalytic reactions of potential endothermic fuels: cis- and trans-decalin; Use of site specific {sup 13}C-labeling to examine the thermal stressing of 1-phenylhexane: A case study for the determination of reaction kinetics in complex fuel mixtures versus model compound studies; Estimation of critical temperatures of jet fuels; and Surface effects on deposit formation in a flow reactor system. Under Task 2, Investigation of incipient deposition, the subtask reported is Uncertainty analysis on growth and deposition of particles during heating of coal-derived aviation gas turbine fuels; under Task 3, Characterization of solid gums, sediments, and carbonaceous deposits, is subtask, Studies of surface chemistry of PX-21 activated carbon during thermal degradation of jet A-1 fuel and n-dodecane; under Task 4, Coal-based fuel stabilization studies, is subtask, Exploratory screening and development potential of jet fuel thermal stabilizers over 400 C; and under Task 5, Exploratory studies on the direct conversion of coal to high quality jet fuels, are 4 subtasks: Novel approaches to low-severity coal liquefaction and coal/resid co-processing using water and dispersed catalysts; Shape-selective naphthalene hydrogenation for production of thermally stable jet fuels; Design of a batch mode and a continuous mode three-phase reactor system for the liquefaction of coal and upgrading of coal liquids; and Exploratory studies on coal liquids upgrading using mesopores molecular sieve catalysts. 136 refs., 69 figs., 24 tabs.

  17. Technical Progress Report for PEPCO: Turbo-Z Battery Charging System

    SciTech Connect

    1999-07-22

    The authors are entering the final phase of development for this project. Work has been imparted to define the components of the flexible battery charger control board. Detailed analog and digital circuits are complete. Improved analog to digital and digital to analog converters have been selected for use with the control board. The control board schematics are complete and construction of the hardware is in progress. The programming of the circuit board modules is underway. The documentation and circuit schematic drawings are in process. The test stand has added the integration of a dedicated fast computer/microprocessor to control the test stand. This will allow measurements to be taken and recorded more often. This has required modification of the software. The software is being debugged. The modules to be controlled by the test stand microprocessor include the charger module, the battery simulator, the discharge pulse, and discharger. Integrating these components will greatly enhance design and testing. An SCR charger power module has been has been designed, built, and debugged. The circuits for the battery simulator and discharge pulse have been detailed and debugged. The discharge pulse characteristics have been defined and designed. The charger power and discharge pulse modules can be used with either the test stand or the flexible control board. This work is the result of extensive catalog and internet research for the test stand and control board components. The documentation for the project is underway. It is important to have this documentation for reference purposes. Also, the drawing schematics will help with future projects, and they will help with flow-charting the projects for all parties involved. The drawings and some output parameters as of June 1999 are attached.

  18. Bed material agglomeration during fluidized bed combustion. Technical progress report, January 1, 1993--March 31, 1993

    SciTech Connect

    Brown, R.C.; Dawson, M.R.; Noble, S.D.

    1993-04-01

    The purpose of this project is to determine the physical and chemical reactions which lead to the undesired agglomeration of bed material during fluidized bed combustion and to relate these reactions to specific causes. A survey of agglomeration and deposit formation in industrial fluidized bed boilers is in progress. Preliminary results indicate that at least five boilers were experiencing some form of bed material agglomeration. In these instances it was observed that large particles were forming within the bed which were larger that the feed. Four operators could confirm that the larger bed particles had formed due to bed particles sticking together or agglomerating. Deposit formation was reported at nine sites with these deposits being found most commonly at coal feed locations and in cyclones. Other deposit locations included side walls and return loops. Examples of these agglomerates and deposits have been received from five of the surveyed facilities. Also during this quarter, a bulk sample of Illinois No. 6 coal was obtained from the Fossil Energy Program at Ames Laboratory here at Iowa State University and prepared for combustion tests. This sample was first ground to a top-size of 3/8`` using a jaw crusher then a size fraction of 3/8`` {times} 8 (US mesh) was then obtained by sieving using a Gilson Test-Master. This size fraction was selected for the preliminary laboratory-scale experiments designed to simulate the dense bed conditions that exist in the bottom of CFB combustors. To ensure uniformity of fuel composition among combustion runs, the sized coal was riffled using, a cone and long row method and stored in bags for each experiment. During this quarter additional modifications were made to achieve better control of fluidization regimes and to aid in monitoring the hydrodynamic and chemical conditions within the reactor.

  19. Development of hydroconversion of biomass to synthetic fuels. Technical progress report, October 1-December 31, 1980

    SciTech Connect

    1981-04-01

    The physical and chemical characterization tests with maple hardwood were completed. Corn stover tests are in progress. The maple hardwood had uniform properties for various size fractions unlike the Douglas fir hog fuel. The ash fusion temperatures for maple hardwood were measured up to 2700/sup 0/F, which is significantly higher than those for coal ash. Studies were conducted to determine the fluidized behavior of mixtures of sand and 5 to 67 vol % of char. Measurements of the bed pressure drop and fluidizing gas velocity were made at several bed heights. At fluidization gas velocities below that of pure sand, the sand provided smooth fluidization and good mixing with the larger, lower density char particles. Drying aspects of maple were examined in terms of front-end drying that will use recovered waste heat. This is important because a constant-moisture feedstock is preferred. Initial thermobalance tests of low-temperature drying typical of front-end, recovered-heat systems were conducted. Linear, well-defined behavior was found for moisture loss in time. Nonisothermal thermobalance runs were made to define temperatures where significant reactions occur and to establish if there is any effect of particle size. Rapid heat-up rate devolatilization of maple hardwood was studied in a free-fall apparatus able to feed and collect large quantities (g/min) of material. Greater than 75% conversion was obtained in less than 0.3 second, and higher hydrogen pressure increased the light hydrocarbon product yield. Isothermal thermobalance experiments were conducted to establish the kinetics of the steam-char reaction. A first-order kinetic model was developed. Further work involved a confirmation of the PDU design values in terms of the information developed in the above work. Additional PDU design details were completed.

  20. Solvent refined coal (SRC) process. Quarterly technical progress report, January 1980-March 1980. [In process streams

    SciTech Connect

    Not Available

    1981-01-01

    This report summarizes the progress of the Solvent Refined Coal (SRC) project at the SRC Pilot Plant in Fort Lewis, Wahsington, and the Process Development Unit (P-99) in Harmarville, Pennsylvania. After the remaining runs of the slurry preheater survey test program were completed January 14, the Fort Lewis Pilot Plant was shut down to inspect Slurry Preheater B and to insulate the coil for future testing at higher rates of heat flux. Radiographic inspection of the coil showed that the welds at the pressure taps and the immersion thermowells did not meet design specifications. Slurry Preheater A was used during the first 12 days of February while weld repairs and modifications to Slurry Preheater B were completed. Two attempts to complete a material balance run on Powhatan No. 6 Mine coal were attempted but neither was successful. Slurry Preheater B was in service the remainder of the quarter. The start of a series of runs at higher heat flux was delayed because of plugging in both the slurry and the hydrogen flow metering systems. Three baseline runs and three slurry runs of the high heat flux program were completed before the plant was shut down March 12 for repair of the Inert Gas Unit. Attempts to complete a fourth slurry run at high heat flux were unsuccessful because of problems with the coal feed handling and the vortex mix systems. Process Development Unit (P-99) completed three of the four runs designed to study the effect of dissolver L/D ratio. The fourth was under way at the end of the period. SRC yield correlations have been developed that include coal properties as independent variables. A preliminary ranking of coals according to their reactivity in PDU P-99 has been made. Techniques for studying coking phenomenona are now in place.

  1. Advanced thermally stable jet fuels. Technical progress report, April 1994--June 1994

    SciTech Connect

    Schobert, H.H.; Eser, S.; Song, C.

    1994-07-01

    Research continued on coal-based, thermally stable, jet fuels. Significant progress has been made on the detection of polycyclic aromatic hydrocarbons present in highly stressed fuels, using high-performance liquid chromatography (HPLC) with diode-array detection. Gas chromatography is not able to detect compounds with {>=}6 fused aromatic rings, but such compounds can be identified using the HPLC method. The concentration of such compounds is low in comparison to aromatics of 1-3 rings, but the role of the large compounds in the formation of solid deposits may be crucial in determining the thermal stability of a fuel. The unusual properties of fluid fuels in the near-critical region appear to have significant effects on their thermal decomposition reactions. This issue has been investigated in the present reporting period using n-tetradecane as a model compound for fuel decomposition. Temperature-programmed retention indices are very useful for gas chromatographic and gas chromatography/mass spectrometric analysis of coal and petroleum derived jet fuels. We have demonstrated this in the identification of components in two JP-8 fuels and their liquid chromatographic fractions. The role of activated carbon surfaces as catalysts in the thermal stressing of jet fuel was investigated using n-dodecane and n-octane as model compounds. In some cases the reactions were spiked with addition of 5% decalin to test the ability of the carbon to catalyze the transformation of decalin to naphthalene. We have previously shown that benzyl alcohol and 1,4-benzenedimethanol are effective stabilizers at temperatures {>=}400{degrees}C for jet fuels and the model compound dodecane. The addition of ethanol to hydrocarbon/benzyl alcohol mixtures has a significant effect on the thermal stabilization of jet fuels above 400{degrees}C. Ethanol appears to function by reducing the benzaldehyde formed during the degradation of the benzyl alcohol. This reduction regenerates the benzyl alcohol.

  2. Directional backlight liquid crystal autostereoscopic display: technical challenges, research progress, and prospect (Conference Presentation)

    NASA Astrophysics Data System (ADS)

    Fan, Hang; Li, Kunyang; Zhou, Yangui; Liang, Haowen; Wang, Jiahui; Zhou, Jianying

    2016-09-01

    Recent upsurge on virtual and augmented realities (VR and AR) has re-ignited the interest to the immerse display technology. The VR/AR technology based on stereoscopic display is believed in its early stage as glasses-free, or autostereoscopic display, will be ultimately adopted for the viewing convenience, visual comfort and for the multi-viewer purposes. On the other hand, autostereoscopic display has not yet received positive market response for the past years neither with stereoscopic displays using shutter or polarized glasses. We shall present the analysis on the real-world applications, rigid user demand, the drawbacks to the existing barrier- and lenticular lens-based LCD autostereoscopy. We shall emphasize the emerging autostereoscopic display, and notably on directional backlight LCD technology using a hybrid spatial- and temporal-control scenario. We report the numerical simulation of a display system using Monte-Carlo ray-tracing method with the human retina as the real image receiver. The system performance is optimized using newly developed figure of merit for system design. The reduced crosstalk in an autostereoscopic system, the enhanced display quality, including the high resolution received by the retina, the display homogeneity without Moiré- and defect-pattern, will be highlighted. Recent research progress including a novel scheme for diffraction-free backlight illumination, the expanded viewing zone for autostereoscopic display, and the novel Fresnel lens array to achieve a near perfect display in 2D/3D mode will be introduced. The experimental demonstration will be presented to the autostereoscopic display with the highest resolution, low crosstalk, Moiré- and defect- pattern free.

  3. Aligning Mathematics Assessment Standards: New Mexico and the 2009 National Assessment of Educational Progress (NAEP). REL Technical Brief. REL 2008-No. 011

    ERIC Educational Resources Information Center

    Shapley, Kathy L.; Brite, Jessica

    2008-01-01

    This technical brief examines the current alignment between the New Mexico Standards Based Assessment (NMSBA) standards and the 2009 National Assessment of Educational Progress (NAEP) mathematics framework. It looks at the extent to which current state assessment standards cover the content on which 2009 NAEP assessments will be based. Applying…

  4. Aligning Mathematics Assessment Standards: Louisiana and the 2009 National Assessment of Educational Progress (NAEP). REL Technical Brief. REL 2008-No. 009

    ERIC Educational Resources Information Center

    Shapley, Kathy L.; Brite, Jessica

    2008-01-01

    This technical brief examines the current alignment between the Louisiana Educational Assessment Program (LEAP) and Graduation Exit Examination (GEE) mathematics assessment standards and the 2009 National Assessment of Educational Progress (NAEP) mathematics framework. It looks at the extent to which current state assessment standards cover the…

  5. Aligning Mathematics Assessment Standards: Oklahoma and the 2009 National Assessment of Educational Progress (NAEP). REL Technical Brief. REL 2008-No. 010

    ERIC Educational Resources Information Center

    Shapley, Kathy L.; Brite, Jessica

    2008-01-01

    This technical brief examines the current alignment between Oklahoma Core Curriculum Tests (OCT) and the 2009 National Assessment of Educational Progress (NAPE) mathematics framework. It looks at the extent to which current state assessment standards cover the content on which 2009 NAPE assessments will be based. Applying the methodology used by…

  6. Aligning Mathematics Assessment Standards: Texas and the 2009 National Assessment of Educational Progress (NAEP). REL Technical Brief. REL 2008-No. 007

    ERIC Educational Resources Information Center

    Shapley, Kathy L.; Brite, Jessica

    2008-01-01

    This Technical Brief examines the alignment between the Texas Assessment of Knowledge and Skills (TAKS) mathematics assessment standards and the 2009 National Assessment of Educational Progress (NAEP) mathematics framework. It looks at the extent to which current state assessment standards cover the content on which 2009 NAEP assessments will be…

  7. Aligning Mathematics Assessment Standards: Arkansas and the 2009 National Assessment of Educational Progress (NAEP). REL Technical Brief. REL 2008-No. 008

    ERIC Educational Resources Information Center

    Shapley, Kathy L.; Brite, Jessica

    2008-01-01

    This Technical Brief examines the current alignment between the Arkansas Comprehensive Testing, Assessment, and Accountability Program (ACTAAP) mathematics assessment standards and the 2009 National Assessment of Educational Progress (NAEP) mathematics framework. It looks at the extent to which current state assessment standards cover the content…

  8. The Development of Early Literacy Measures for Use in a Progress Monitoring Assessment System: Letter Names, Letter Sounds and Phoneme Segmenting. Technical Report # 39

    ERIC Educational Resources Information Center

    Alonzo, Julie; Tindal, Gerald

    2007-01-01

    In this technical report, the authors describe the development alternate forms of three types of early literacy measures as part of a comprehensive progress monitoring literacy assessment system developed in 2006 for use with students in Kindergarten through fourth grade. They begin with a brief overview of the two conceptual frameworks underlying…

  9. Savannah River Ecology Laboratory Annual Technical Progress Report of Ecological Research, June 30, 2001

    SciTech Connect

    Bertsch, Paul M.; Janecek, Laura; Rosier, Brenda

    2001-06-30

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA) and has been conducting ecological research on the Savannah River Site (SRS) in South Carolina for 50 years. The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts fundamental and applied ecological research, as well as education and outreach programs, under a Cooperative Agreement with the U.S. Department of Energy (DOE) SRS near Aiken, South Carolina. The Laboratory's research mission during the 2001 fiscal year was fulfilled with the publication of one book and 83 journal articles and book chapters by faculty, technical staff, students, and visiting scientists. An additional 77 journal articles have been submitted or are in press. Other noteworthy events took place as faculty members and graduate students received awards. These are described in the section Special Accomplishments of Faculty, Staff, Students, and Administration on page 54. Notable scientific accomplishments include work conducted on contaminant transport, global reptile decline, phytoremediation, and radioecology. Dr. Domy Adriano authored the second edition of his book ''Trace Elements in Terrestrial Environments: Biogeochemistry, Bioavailability, and Risks of Metals'', which was recently published by Springer-Verlag. The book provides a comprehensive treatment of many important aspects of trace elements in the environment. The first edition of the book, published in 1986, has become a widely acclaimed and cited reference. International attention was focused on the problem of reptile species decline with the publication of an article on this topic in the journal ''Bioscience'' in August, 2000. The article's authors included Dr. Whit Gibbons and a number of other SREL herpetologists who researched the growing worldwide problem of decline of reptile species. Factors related to these declines include habitat loss and

  10. Final Technical Progress Report Long term risk from actinides in the environment: Modes of mobility

    SciTech Connect

    Thomas B. Kirchner

    2002-03-22

    The key source of uncertainty in assessing actinide mobility is the relative importance of transport by: (1) wind erosion, (2) water erosion, and (3) vertical migration. Each of these three processes depends on several environmental factors and they compete with one another. A scientific assessment of the long-term risks associated with actinides in surface soils depends on better quantifying each of these three modes of mobility. The objective from our EMSP study was to quantify the mobility of soil actinides by wind erosion, water erosion, and vertical migration at three semiarid sites where actinide mobility is a key technical, social and legal issue. This EMSP project was the first to evaluate all three factors at a site. The approach has been to investigate both short- and long-term issues based on field and lab studies and model comparisons. Our results demonstrate the importance of incorporating threshold responses into a modeling framework that accounts for environmental factors and natural disturbances that trigger large changes in actinide mobility. The study measured erosional losses of sediment and fallout cesium (an actinide analogue) from field plots located near WIPP in 1998. The results highlight the large effect of burning as a disturbance on contaminant transport and mobility via runoff and erosion. The results show that runoff, erosion, and actinide transport are (1) strongly site specific-differences in radionuclide transport between WIPP and Rocky Flats differed by a factor of twelve because of soil and vegetation differences, and (2) are strongly impacted by disturbances such as fire, which can increase runoff, erosion, and actinide transport by more than an order of magnitude. In addition, a laboratory experiment using soil columns was conducted to investigate the vertical transport of contaminants in sandy soils. Nine columns of soil collected from the vicinity of the WIPP site were prepared. The column consisted of a piece of PVC pipe 20 cm

  11. Evaluation of an Experimental Re-introduction of Sockeye Salmon into Skaha Lake; Year 2 of 3, 2001 Technical Report.

    SciTech Connect

    Fisher, Christopher; Machin, Deanna; Wright, Howie

    2002-04-01

    This report summarizes the findings from YEAR 2 of a three-year disease risk assessment. The Okanagan Nation Fisheries Commission (ONFC) and the Colville Confederated Tribes (CCT) are investigating the risks involved in re-introducing sockeye salmon into Skaha Lake, part of their historical range (Ernst and Vedan 2000). The disease risk assessment compares the disease and infection status of fish above and below McIntyre Dam (the present limit of sockeye migration). The disease agents identified that are of a particular concern are: infectious pancreatic necrosis virus (IPNV), infectious haematopoietic necrosis virus type 2 (IHNV type2), erythrocytic inclusion body syndrome virus (EIBSV), the whirling disease agent (Myxobolus cerebralis), and the ceratomyxosis agent (Ceratomyxa shasta).

  12. Spatial characterization of acid rain stress in Canadian Shield Lakes. Progress report, 1 August 1986-1 February 1987

    SciTech Connect

    Tanis, F.J.

    1987-01-01

    The acidification of lake waters from airborne pollution is of continental proportions both in North America and Europe. A major concern of the acid rain problem is the cumulative ecosystem damage to lakes and forest. The number of lakes affected in northeastern U.S. and on the Canadian Shield is though to be enormous. How seasonal changes in lake transparency are related to annual acidic load was examined. The relationship between variations in lake acidification and ecophysical units was also examined. The utility of Thematic Mapper based observations to measure seasonal changes in the optical transparency in acid lakes was investigated. The potential for this optical response is related to a number of local ecophysical factors with bedrock geology being, perhaps, the most important. Other factors include sulfate deposition, vegetative cover, and terrain drainage/relief. The area of southern Ontario contains a wide variety of geologies from the most acid rain sensitive granite quartzite types to the least sensitive limestone dolomite sediments. Annual sulfate deposition ranges from 1.0 to 4.0 grams/sq m.

  13. Modeling the impacts of climate change and technical progress on the wheat yield in inland China: An autoregressive distributed lag approach.

    PubMed

    Zhai, Shiyan; Song, Genxin; Qin, Yaochen; Ye, Xinyue; Lee, Jay

    2017-01-01

    This study aims to evaluate the impacts of climate change and technical progress on the wheat yield per unit area from 1970 to 2014 in Henan, the largest agricultural province in China, using an autoregressive distributed lag approach. The bounded F-test for cointegration among the model variables yielded evidence of a long-run relationship among climate change, technical progress, and the wheat yield per unit area. In the long run, agricultural machinery and fertilizer use both had significantly positive impacts on the per unit area wheat yield. A 1% increase in the aggregate quantity of fertilizer use increased the wheat yield by 0.19%. Additionally, a 1% increase in machine use increased the wheat yield by 0.21%. In contrast, precipitation during the wheat growth period (from emergence to maturity, consisting of the period from last October to June) led to a decrease in the wheat yield per unit area. In the short run, the coefficient of the aggregate quantity of fertilizer used was negative. Land size had a significantly positive impact on the per unit area wheat yield in the short run. There was no significant short-run or long-run impact of temperature on the wheat yield per unit area in Henan Province. The results of our analysis suggest that climate change had a weak impact on the wheat yield, while technical progress played an important role in increasing the wheat yield per unit area. The results of this study have implications for national and local agriculture policies under climate change. To design well-targeted agriculture adaptation policies for the future and to reduce the adverse effects of climate change on the wheat yield, climate change and technical progress factors should be considered simultaneously. In addition, adaptive measures associated with technical progress should be given more attention.

  14. I-NERI QUARTERLY TECHNICAL PROGRESS REPORT - JANUARY 1 - MARCH 31, 2005

    SciTech Connect

    Chang Oh

    2005-03-01

    codes. The three categories of experiments were performed in the facility; (1) upper pool cooling trip test, (2) LOFC experiment, (3) emissivity measurement experiment. (C) Prof. NO continued Task 3. (Prof NO) The experimental work of air ingress is going on without any concern: Geometry and size effect test has been completed. The conversion factor for internal surface area was obtained through this experiment. Burn-off test was performed and the uniformity of internal reaction was confirmed. (D) INEEL engineers continued to extend the diffusion model for multiple chemical species and made some calculations. (E) Prof. Lee and Martin at University of Michigan continued to analyze the effect of the stochastic fuel on the neutronic analysis and have initiated fuel depletion calculations for the VHTGR core. Progress during the past quarter includes: Further analysis of stochastic fuel geometry; Preliminary Monte Carlo depletion of full-core VHTGR; and Installation of MCNP5 on Unix cluster.

  15. Ancient plant DNA in lake sediments.

    PubMed

    Parducci, Laura; Bennett, Keith D; Ficetola, Gentile Francesco; Alsos, Inger Greve; Suyama, Yoshihisa; Wood, Jamie R; Pedersen, Mikkel Winther

    2017-04-03

    Contents I. II. III. IV. V. VI. VII. VIII. IX. X. XI. References SUMMARY: Recent advances in sequencing technologies now permit the analyses of plant DNA from fossil samples (ancient plant DNA, plant aDNA), and thus enable the molecular reconstruction of palaeofloras. Hitherto, ancient frozen soils have proved excellent in preserving DNA molecules, and have thus been the most commonly used source of plant aDNA. However, DNA from soil mainly represents taxa growing a few metres from the sampling point. Lakes have larger catchment areas and recent studies have suggested that plant aDNA from lake sediments is a more powerful tool for palaeofloristic reconstruction. Furthermore, lakes can be found globally in nearly all environments, and are therefore not limited to perennially frozen areas. Here, we review the latest approaches and methods for the study of plant aDNA from lake sediments and discuss the progress made up to the present. We argue that aDNA analyses add new and additional perspectives for the study of ancient plant populations and, in time, will provide higher taxonomic resolution and more precise estimation of abundance. Despite this, key questions and challenges remain for such plant aDNA studies. Finally, we provide guidelines on technical issues, including lake selection, and we suggest directions for future research on plant aDNA studies in lake sediments.

  16. Advanced direct liquefaction concepts for PETC generic units, Phase 2. Quarterly technical progress report for period October--December 1995

    SciTech Connect

    1996-02-01

    Progress reports are presented for: Task 1 management plan; Task 2.1 laboratory support (University of Kentucky/Center for Applied Energy Research); Task 3 continuous operations/parametric studies (Hydrocarbon Technologies, Inc.); Task 4.1 process modeling; and Task 4.4 preliminary technical assessment (LDP Associates). Some of the high points for this period are: the activity of the base catalyst prepared by pressure filtration of the Wilsonville Run 262E V-1082 ashy resid was determined and compared with the conversion of coal in the absence of any added catalyst; this material was found to contain 740 mg Mo/kg; in the catalyst screening test, the pressure filtered solids that had been added to the reaction mixture to a level equivalent to the solids contained in Wilsonville Run 263J gave coal conversion of 98.2% with a resid conversion of 24%; and the effect of presulfiding conditions on activating a Mo-impregnated coal with different H{sub 2}S/H{sub 2} mixtures at different temperatures and reaction times was investigated.

  17. Fundamental characterization of alternate fuel effects in continuous combustion systems. Summary technical progress report, August 15, 1978-January 31, 1980

    SciTech Connect

    Blazowski, W.S.; Edelman, R.B.; Wong, E.

    1980-02-27

    The overall objective of this contract is to assist in the development of fuel-flexible combustion systems for gas turbines as well as Rankine and Stirling cycle engines. The primary emphasis of the program is on liquid hydrocarbons produced from non-petroleum resources. Fuel-flexible combustion systems will provide for more rapid transition of these alternative fuels into important future energy utilization centers (especially utility power generation with the combined cycle gas turbine). The specific technical objectives of the program are: (a) develop an improved understanding of relationships between alternative fuel properties and continuous combustion system effects, and (b) provide analytical modeling/correlation capabilities to be used as design aids for development of fuel-tolerant combustion systems. This is the second major report of the program. Key experimental findings during this reporting period concern stirred combustor soot production during operation at controlled temperature conditions, soot production as a function of combustor residence time, an improved measurement technique for total hydrocarbons and initial stirred combustor results of fuel nitrogen conversion. While the results to be presented concern a stirred combustor which utilizes premixed fuel vapor/oxidant mixtures, a new combustor which combusts liquid fuel injected into the reactor as a spray has been developed and will be described. Analytical program progress includes the development of new quasiglobal models of soot formation and assessment of needs for other submodel development.

  18. High octane ethers from synthesis gas-derived alcohols. Quarterly technical progress report, July--September 1993

    SciTech Connect

    Klier, K.; Herman, R.G.; Feeley, O.C.; Johansson, M.A.

    1993-11-01

    The objective of the proposed research is to synthesize oxygenated fuel ethers, primarily methyl isobutyl ether (MIBE) and methyl tertiary butyl ether (MTBE), directly from coal-derived H{sub 2}/CO/CO{sub 2} synthesis via alcohol mixtures that are rich in methanol and 2-methyl-1-proanol (isobutanol). The overall scheme involves gasification of coal, purification and shifting of the synthesis gas, higher alcohol synthesis, and direct synthesis of ethers. Both organic and inorganic catalysts will be investigated, and the better catalysts will be subjected to long term performance studies. The project is divided into the following three tasks: (1) synthesis of high octane ethers from alcohol mixtures containing predominantly methanol and 2-methyl-1-propanol over superacid resins, (2) inorganic catalysts for the synthesis of high octane ethers form alcohols, and (3) long term performance and reaction engineering for scale-up of the alcohols-to-ether process. A summary of technical progress is provided in this report.

  19. Bench-scale testing of the micronized magnetite process. Second quarterly technical progress report, October 1994--December 1994

    SciTech Connect

    1995-01-19

    This document contains the Quarterly Technical Progress Report for the Micronized Magnetite Testing Project being performed at PETC`s Process Research Facility (PRF). This second quarterly report covers the period from October, 1994 through December, 1994. The main accomplishments of Custom Coals and the project subcontractors, during this period, included: (1) Submitted all overdue project documents and kept up with routine reporting requirements; (2) Worked with CLI Corporation, the design subcontractor, and completed the circuit design and finalized all design drawings; (3) Specified and procured all of the process equipment for the circuit, as well as a number of ancillary equipment, instruments, and supplies; (4) Assisted Vangura Iron Inc. in detailing and constructing the structural and platework steel; (5) Subcontracted Rizzo & Sons to perform the circuit mechanical and electrical installation, and prepared for January 23rd installation start date; (6) Organized and prepared for coal and magnetite procurement; (7) Specified and organized an operating personnel plan for the commissioning and testing tasks in the project; (8) Assessed analytical challenges for project, and began to research problem areas. This report contains a short discussion of the project description, objectives, budget, schedule, and teaming arrangement. It also includes a detailed discussion of the abovementioned project accomplishments and plans, organized by the various task series within the project work plan. The final section contains an outline of the specific project goals for the next quarterly reporting period.

  20. Hot gas cleanup test facility for gasification and pressurized combustion. Quarterly technical progress report, April 1--June 30, 1992

    SciTech Connect

    Not Available

    1992-12-01

    This quarterly technical progress report summarizes work completed during the Seventh Quarter of the First Budget Period, April 1 through June 30, 1992, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion will include the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source; Hot Gas Cleanup Units to mate to all gas streams. Combustion Gas Turbine; Fuel Cell and associated gas treatment; and Externally Fired Gas Turbine/Water Augmented Gas Turbine. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

  1. Developments in breeding of Agaricus bisporus var. bisporus: progress made and technical and legal hurdles to take.

    PubMed

    Sonnenberg, Anton S M; Baars, Johan J P; Gao, Wei; Visser, Richard G F

    2017-03-01

    True breeding of button mushrooms has hardly been done in the last decades, despite this species being one of the most cultivated mushrooms worldwide. Research done in the last 20 years has identified and characterised new germplasm and improved our understanding of the genetic base for some traits. A substantial collection of wild-collected strains is now available and partly characterised for a number of important traits such as disease resistance and yield. Most of the variations found in a number of important agronomic traits have a considerable heritability and are thus useful for breeding. Genetic marker technology has also developed considerably for this mushrooms in the last decade and used to identify quantitative trait loci (QTL) for important agronomic traits. This progress has, except for one example, not resulted so far into new commercially varieties. One of the reasons lies in the typical life cycle of the button mushroom Agaricus bisporus var. bisporus which hampers breeding. Joint investment is needed to solve technical problems in breeding. Special attention is needed for the protection of new varieties. Due to its typical life cycle, it is very easy to generate so called "look-a-likes" from protected cultivars by screening fertile single spore cultures. A consensus has been reached within the mushroom (breeding) industry to consider this method as the generation of essentially derived varieties as defined in plant breeding.

  2. Gas turbine demonstration of pyrolysis: derived fuels. Third technical progress report, July 1, 1979-December 31, 1981

    SciTech Connect

    Jasas, G.; Kasper, J.

    1982-01-01

    The objective of this program is to demonstrate the feasibility of utilizing pyrolytic oil and char as a fuel for a combustion turbine engine. This is the first phase of an extended program with the ultimate goal of commercializing a gas turbine engine and electrical generating system which is independent of petroleum-based fuels. Maximum use of existing technology and current production engine hardware (Teledyne CAE Model J69-T-29 Turbojet Engine) is being incorporated for a sequence of test evaluations rating from isolated combustor component tests to full scale engine demonstration tests. The technical goals to be achieved during the course of this project are: pyrolytic fuel characterization in terms of its properties and constituents; pyrolytic fuel combustion technology in gas turbine application in terms of pyrolytic oil atomization, quantity of char burned, emissions, performance and associated combustion system aerothermodynamics; pyrolytic fuel (oil and char slurry) handling, mixing, and storage technology; and engine materials compatibility with the the pyrolytic fuel and its combustion products. Progress achieved during the period from July 1979 through Deember 1981 in design, analysis, an project management hardware fabrication and procurement, fuel chemistry and properties, and combustor rig tests are summarized.

  3. Michigan Middle Start Studies of Middle Start School Improvement, Lake Middle School: A Case Study.

    ERIC Educational Resources Information Center

    Gopalan, Pritha

    This case study documented the collaboration of Lake Middle School (pseudonym for a school in Michigan) with Middle Start, a middle-grades reform model and its progress and struggles implementing the model. Middle Start was coordinated by the Michigan Middle Start Partnership, and alliance that provided technical assistance, professional…

  4. TECHNICAL EDUCATION.

    ERIC Educational Resources Information Center

    FRIGIOLA, NICHOLAS F.

    THE CONSENSUS OF OUR NATION'S LEADERS AFFIRMS THAT THE COUNTRY'S GREATEST TECHNICAL EDUCATION VOID IS IN THE AREA BETWEEN THE 12TH GRADE AND THE BACCALAUREATE DEGREE. THE IMPACT OF ACCELERATED PROGRESS IN TECHNOLOGICAL ACHIEVEMENTS MAKES TECHNICAL EDUCATION MANDATORY IF THE MANPOWER SHORTAGE IS NOT TO BECOME A NATIONAL EMERGENCY. BECAUSE NEARLY 80…

  5. Index to Nuclear Safety: a technical progress review by chronology, permuted title, and author, Volume 18 (1) through Volume 22 (6)

    SciTech Connect

    Cottrell, W.B.; Passiakos, M.

    1982-06-01

    This index to Nuclear Safety covers articles published in Nuclear Safety, Volume 18, Number 1 (January-February 1977) through Volume 22, Number 6 (November-December 1981). The index is divided into three section: a chronological list of articles (including abstracts), a permuted-title (KWIC) index, and an author index. Nuclear Safety, a bimonthly technical progress review prepared by the Nuclear Safety Information Center, covers all safety aspects of nuclear power reactors and associated facilities. Over 300 technical articles published in Nuclear Safety in the last 5 years are listed in this index.

  6. Final Technical Progress Report

    SciTech Connect

    J.Y. Hwang; R.C. Greenlund

    2002-12-31

    Michigan Technological University has demonstrated major inroads in establishing the viability of utilizing aluminum smelting by-product waste materials in lightweight concrete product applications. The research identified key elements of producing various forms of lightweight concrete products through utilizing various procedures and mixture components with the by-product materials. A process was developed through pilot plant testing that results in additional aluminum recovery at finer sizes, a clean returnable salt product through spray drying technology, and a low-salt-content oxide product with enough aluminum metal content that it can be used to form lightweight cementitious mixtures. Having three distinct products aids in generating favorable process economics. Revenue projections from aluminum recovery and salt recovery are enough to cover processing costs and create a cost-free oxide product to market for lightweight concrete applications. This supply side commercialization strategy offers aluminum by-product recyclers a potentially no cost product, which has been demonstrated through this project to create desirable and marketable lightweight concrete products of various forms. Environmental benefits to the public are tremendous. At best, all dross and salt cake materials have the potential to be completely recycled and utilized. At worst, disposal sites would see a reduced amount of material: a post processed oxide product with little salt and no hydrogen sulfide or ammonia gas generating capability, which, if isolated from high alkali conditions, would pose no reactivity concerns. The US aluminum industry has historically, along with the steel industry, been a leader in recycling metal. The findings from this project, increased metal recovery, improved salt recycling, and demonstrated end uses for oxide residues, will go a long way in helping the aluminum industry obtain 100% material utilization and zero discharge.

  7. Quarterly Technical Progress Report

    SciTech Connect

    Mary K. Banken

    1998-06-30

    This project has identified all FDD oil reservoirs in Oklahoma; grouped those reservoirs into plays that have similar depositional origins; collected, organized, and analyzed all available data; conducted characterization and simulation studies on selected reservoirs in each plays; and implemented a technology transfer program targeted to the operators of FDD reservoirs. By fulfilling these objectives, the FDD project has had the goal of helping to sustain the life expectancy of existing wells and provide incentive for development and exploratory wells with the ultimate objective of increasing oil recovery.

  8. Technical Progress Report

    SciTech Connect

    Paul D. Ronney

    2004-08-26

    An ignition source was constructed that is capable of producing a pulsed corona discharge for the purpose of igniting mixtures in a test chamber. The corona generator can also be used as the ignition source for one cylinder on a test engine. The first tests were performed in a cylindrical shaped chamber to study the characteristics of the corona and analyze various electrode geometries. Next a test chamber was constructed that closely represented the dimensions of the combustion chamber of the test engine at USC. Combustion tests were performed in this chamber and various electrode diameters and geometries were tested. Higher peak pressures and faster pressure rise times were realized consistently in all test chambers versus standard spark plug ignition. A test engine was purchased for the project that has two spark plug ports per cylinder to The data acquisition and control system hardware for the USC engine lab was updated with new equipment. New software was also developed to perform the engine control and data acquisition functions including cylinder pressure monitoring. A ceramic corona electrode has been designed that fits in the new test engine and is capable of withstanding the pressures and temperatures encountered inside the combustion chamber. The corona ignition system was tested on the engine and an increase in both peak pressure and IMEP were seen in the initial test. There are issues that must be addressed before on-engine testing can continue such as EMF interference from the corona generator and electrical insulation on portions of the piston and cylinder head to prevent arcing. The EMF issue can be solved with proper shielding and grounding and various ceramic coatings are being researched for electrical insulation.

  9. Quarterly Technical Progress Report

    SciTech Connect

    Yi Hua Ma

    1998-03-16

    The temperature dependence of the oxygen flux across the BaCe0G03 dense membrane (BCG membrane) tube was investigated. In the temperature range of 688C to 955C, the increase in the oxygen flux with temperature obeyed the Arrhenius law. An increase in the helium sweep flow membrane tube. rate in the tube side resulted in an increase in the oxygen flux through the The oxygen fluxes through the BCG dense membrane tube were measured at different oxygen partial pressures in the shell side. The oxygen flux increased with the oxygen partial pressure in the shell side. The BCG dense membrane was tested in a membrane reactor for the catalytic oxidative coupling of methane. The BCG membrane is not a complete combustion catalyst, and the catalytic activity of the BCG membrane was found to be much higher than the Argonne dense membrane. As the oxygen partial pressure in the shell side increased, the C2 decreased while the C2 yield remained unchanged, indicating that non-selective, reactions still played a significant role in the membrane reactor.

  10. 1993 Annual progress report for subsidiary agreement No. 2 (1991--1996) between AECL and US/DOE for a radioactive waste management technical co-operative program

    SciTech Connect

    1993-12-31

    A coordinated research program on radioactive waste disposal is being carried out by the Atomic Energy of Canada Limited and the US Department of Energy. This annual report describes progress in the following eight studies: Fundamental materials investigations; In-situ stress determination; Development of a spent fuel dissolution model; Large block tracer test--Experimental testing of retardation models; Laboratory and field tests of in-situ hydrochemical tools; Cigar Lake--Analogue study, actinide and fission product geochemistry; Performance assessment technology exchange; and Development of multiple-well hydraulic test and field tracer test methods.

  11. Progress and plans of a remote sensing program for the International Field Year for the Great Lakes (IFYGL)

    NASA Technical Reports Server (NTRS)

    Polcyn, F. C.; Wagner, T. W. (Principal Investigator)

    1972-01-01

    The author has identified the following significant results. ERTS-1 coverage of the 32,000 square mile Lake Ontario Basin is being used to study short term and seasonal changes which affect many aspects of water problems in the Great Lakes. As part of the International Field Year for the Great Lakes (IFYGL), a coordinated, synoptic study of the Lake Ontario Basin, processed ERTS-1 imagery will contribute to the data base of synchronized observations being made by investigators from many U.S. and Canadian government agencies and universities. The first set of ERTS data has been received and will be processed shortly for parameters of hydrological and limnological significance such as land use, terrain features, and water quality. When complete, nine ERTS-1 frames recorded during a substantially clear period will provide coverage of the entire Basin. Seven frames show all but a small portion of the southern and eastern end of the Basin. Many drainage basin characteristics are clearly identifiable on the imagery.

  12. IMPLICATION OF LAKE WATER RESIDENCE TIME ON THE CLASSIFICATION OF NORWEGIAN SURFACE WATER SITES INTO PROGRESSIVE STAGES OF NITROGEN SATURATION

    EPA Science Inventory

    Seasonal behaviour of NO3- in surface water is often used as an indicator on a catchment's ability to retain N from atmospheric deposition. In this paper, we classify 12 pristine sites (five streams and seven lakes) in southernmost Norway according to the N saturation stage conce...

  13. IMPLICATION OF LAKE WATER RESIDENCE TIME ON THE CLASSIFICATION OF NORWEGIAN SURFACE WATER SITES INTO PROGRESSIVE STAGES OF NITROGEN SATURATION

    EPA Science Inventory

    Seasonal behaviour of NO3- in surface water is often used as an indicator on a catchment's ability to retain N from atmospheric deposition. In this paper, we classify 12 pristine sites (five streams and seven lakes) in southernmost Norway according to the N saturation stage conce...

  14. GPHS-RTGs in support of the Cassini Mission. Semi annual technical progress report, 1 April 1996--29 September 1996

    SciTech Connect

    1996-10-20

    This technical progress report discusses work on the Radioisotope Generators and Ancillary Activities for the Cassini spacecraft. The Cassini spacecraft is expected to launch in October 1997, and will explore Saturn and its moons. This progress report discusses issues in: spacecraft integration and liason, engineering support, safety, qualified unicouple fabrication, ETG fabrication and testing, ground support equipment, RTG shipping and launch support, designs, reviews and mission application. Safety analysis of the RTGs during reentry and launch accidents are covered. This report covers the period of April 1 to September 29, 1996.

  15. Active sites in char gasification. Quarterly technical progress report, 1 January 1984-31 March 1984. [Polymers of phenol-formaldehyde family; chars produced from model compounds

    SciTech Connect

    Calo, J.M.; Suubers, E.M.; Wojtowicz, M.; Lilly, W.

    1984-05-01

    This project is concerned with the study of the nature and behavior of active sites in gasification of chars produced from synthesized model compounds, primarily of the phenol-formaldehyde family of resins. The current technical progress report presents further developments on resin synthesis and characterization and the design of a pyro-gasifier reactor for transient kinetic studies of the chars produced from the model compounds. 7 references, 12 figures, 2 tables.

  16. Kokanee Impacts Assessment and Monitoring on Lake Pend Oreille, Idaho, Annual Progress Report for October 1995-September 1996.

    SciTech Connect

    Maiolie, Melo A.

    1998-09-01

    The purpose of this project was to Monitor Lake Pend Oreille's kokanee Oncorhynchus nerka kennerlyi population. Data will serve as a baseline for evaluating the benefits of a higher winter lake level beginning in 1996. We estimated the kokanee population in Lake Pend Oreille using a Hauser-type midwater trawl during August 1995 and September 1996. Population estimates in 1995 were 4.55 million age-0 kokanee, 2.87 million age-1 kokanee, 1.52 million age-2 kokanee, 0.74 million age-3 kokanee, 0.15 million age-4 kokanee, and 42,000 age-5 kokanee. Population estimates in 1996 were 5.42 million age-0 kokanee, 3.57 million age-1 kokanee, 3.17 million age-2 kokanee, 0.67 million age-3 kokanee, 0.44 million age-4 kokanee, and no age-5 kokanee. These were two of the highest total populations of kokanee since trawling began in 1977; largely due to high numbers of young kokanee. The densities of age-4 and 5 kokanee (which make up the bulk of the fishery), however, were the lowest on record in 1995 and average in 1996. We also surveyed traditional shoreline and tributary spawning areas. Counts of kokanee spawning in tributaries during 1995 were relatively consistent with previous years (6,261 kokanee). Counts of spawners along the shorelines reached a new record low of only 74 kokanee; a 93 percent decline from 1994. During December 1996, both counts dropped to their lowest point on record. Only 49 fish were seen spawning along the shorelines, and only 819 fish were seen in tributary streams. These low counts may have been partially due to higher lake levels during the spawning seasons. Higher than normal lake levels made additional gravel available for kokanee spawning in many areas of the lake. Possibly this caused kokanee to spread along the shorelines and reduced the spawner counts. Kokanee fry that had been fin clipped and stocked at the Cabinet Gorge Fish Hatchery Ladder in 1991 and 1992 returned at a rate of 0.27% and 0.14% once they matured. This return rate was much

  17. Rapid pressure swing absorption cleanup of post-shift reactor synthesis gas. Technical progress report, August 1, 1992--October 31, 1992

    SciTech Connect

    Sirkar, K.K.; Majumdar, S.; Bhaumik, S.

    1993-01-29

    The theoretical model for the absorption part of a particular type of RAPSAB cycle (Mode 3) (see Technical Progress Report No. 7) has been developed. The numerical simulations of the model compare well with the experimental results presented in the last report (Technical Progress Report No. 7). A number of experiments were carried out also for Mode 2 type of operation by varying the time for initial pressurization of the hollow fiber module as well as the total absorption time. These were done to provide a basis for comparison with the theoretical model to be developed later. We have initiated RAPSAB studies with reactive absorbents such as 19.5 % aqueous solution of diethanolamine (DEA) for the absorption of C0{sub 2} from a C0{sub 2}-N{sub 2} mixture. Six experiments were carried out using Mode 3 type of operation and a C0{sub 2}-N{sub 2} mixture containing 9.9% CO, and balance N{sub 2}. Excellent purification was obtained. No C0{sub 2} was observed in the purified high pressure gas outlet for absorption time of up to 14 seconds; the purified high pressure gas flow rate was also considerable. Module No. 5 was used for all experiments. The details of the module are given in Technical Progress Report No. 7.

  18. A 200 year sedimentary record of progressive eutrophication in Lake Greifen (Switzerland): Implications for the origin of organic-carbon-rich sediments

    SciTech Connect

    Hollander, D.J. ); McKenzie, J.A. ); Haven, H.L. ten )

    1992-09-01

    Over the past 200 years Lake Greifen, a small lake in northeastern Switzerland, has undergone dramatic changes in primary productivity and eutrophication due to increased nutrient supply from agricultural activity and industrialization. A 40 year historical record of the water-column chemistry indicates that productivity and eutrophication reached a maximum in 1974, after which stricter regulations on the input of nutrients resulted in a progressive decrease. Collected cores show the sedimentary expression of this anthropogenically induced eutrophication by a well-developed annual sedimentation and by enhanced values of total organic carbon, organic-carbon accumulation rates, and hydrogen indices (HI) of the kerogens. Analyses of the carbon isotopic composition of sedimentary carbonates and organic matter reveal that the fractionation between these two phases varies with the HI of kerogens. This observation is explicable in terms of changing productivity and preservation of the organic matter, and the CO[sub 2 (aq)] budget of the water body. The authors propose that if high primary productivity were primarily responsible for the preservation and accumulation of organic matter, then a negative correlation will occur between [Delta][delta][sup 13]C[sub calcite-organic matter]([Delta][delta][sup 13]C[sub cal-om]) and HI values. In an environment with relatively low to moderate productivity but with bottom-water anoxia, a positive correlation will exist between [Delta][delta][sup 13]C[sub cal-om] and HI values. This study of Lake Greifen has implications for understanding paleoenvironmental controls on ancient organic-carbon-rich sediments.

  19. Sedimentological evidences for progressive drying of the Sahara during the last 6000 years from the annually laminated record of Lake Yoa

    NASA Astrophysics Data System (ADS)

    Francus, Pierre; von Suchodoletz, Hans; Dietze, Michael; Verschuren, Dirk; Kröpelin, Stefan

    2010-05-01

    Lake Yoa is a perennial lake entirely fed by groundwater and located in the Saharan desert of Northern Chad. It contains a unique continuous and high-resolution record of the climate history of the eastern Sahara for the last 6000 years (Kröpelin et al. 2008). Analyses of aquatic and terrestrial paleoecosystems revealed a slow and progressive drying of the region since mid-Holocene (Kröpelin et al. 2008 and Eggermont 2008). Here, we describe the sedimentological evolution of this finely laminated, undisturbed, 7.5 m-long sequence. Comparison of lamination counts with radiocarbon and 137-Cs dates indicates that these couplets are annual, i.e. varves. Counts were made using Fe, and Ca/Ti profiles as well as radiographs acquired using an Itrax µ-XRF core scanner with 100 µ resolution. Three facies could be distinguished. From 6 ka until 1.1 ka, couplets are: (1) a dark brown layer composed of organic matter, aeolian sands and finer detrital material; (2) a light brown layer of neoformed calcite. After 1.1 ka, couplets are formed by (1) a detrital layer consisting of a mixture of aeolian and resuspended material rich in both Fe and Ca and (2) organic-rich material. The change in varve facies corresponds to an abrupt decrease in Ca content and the simultaneous disappearance of neoformed calcite. This may be attributed to exhaustion of carbonate sources in the aquifer or surrounding dry lake beds as well as to a decrease of primary productivity triggering the precipitation of neoformed calcite. The laminated facies are intercalated with the third facies, of which there are relatively few. It consists of few coarser beds indicative of higher energy events due to changes in lake level or dune migration towards the coring site. Magnetic susceptibility broadly increases from bottom to top and may be indicative of the combined effect of changes in the sediment source and redox conditions in the water column. The clay fraction is interpreted to be of aeolian or fluvial

  20. Strong assortative mating by diet, color, size, and morphology but limited progress toward sympatric speciation in a classic example: Cameroon crater lake cichlids.

    PubMed

    Martin, Christopher H

    2013-07-01

    Models predict that sympatric speciation depends on restrictive parameter ranges, such as sufficiently strong disruptive selection and assortative mating, but compelling examples in nature have rarely been used to test these predictions. I measured the strength of assortative mating within a species complex of Tilapia in Lake Ejagham, Cameroon, a celebrated example of incipient sympatric adaptive radiation. This species complex is in the earliest stages of speciation: morphological and ecological divergence are incomplete, species differ primarily in breeding coloration, and introgression is common. I captured 27 mated pairs in situ and measured the diet, color, size, and morphology of each individual. I found strong assortative mating by color, size, head depth, and dietary source of benthic or pelagic prey along two independent dimensions of assortment. Thus, Ejagham Tilapia showed strong assortative mating most conducive to sympatric speciation. Nonetheless, in contrast to a morphologically bimodal Sarotherodon cichlid species pair in the lake, Ejagham Tilapia show more limited progress toward speciation, likely due to insufficient strength of disruptive selection on morphology estimated in a previous study (γ = 0.16). This supports the predicted dependence of sympatric speciation on strong assortment and strong disruptive selection by examining a potentially stalled example in nature.

  1. Kokanee Stock Status and Contribution of Cabinet Gorge Hatchery, Lake Pend Oreille, Idaho, 1987 Annual Progress Report.

    SciTech Connect

    Bowles, Edward C.

    1988-05-01

    Estimated kokanee Oncorhynchus nerka abundance in Lake Pend Oreille was 6.01 million during late summer 1987. This estimate is 40% higher than the 1986 estimate and is the second largest population estimate since 1977. Higher abundance is predominantly a result of enhanced fry survival and recruitment. Hatchery-reared fry contribution was 22% of total fry recruitment in 1987, compared to 8% in 1986, and resulted from a fivefold increase in survival. Much of this improvement can be attributed to the large (52 mm) fry produced at Cabinet Gorge Hatchery in 1987 and represents the first measurable contribution of the new hatchery to the kokanee rehabilitation program. Survival of hatchery-reared fry released into Clark Fork River was nearly one-half that of fry released into Sullivan Springs due to poor flow conditions and potentially high predation during migration from Cabinet Gorge Hatchery to Lake Pend Oreille. Wild fry survival was enhanced by early availability of forage (cladocern zooplankton) during fry emergence in late spring. Cladoceran production began three weeks earlier in 1987 than 1986, which resulted from reduced Mysis abundance and earlier thermal stratification of Lake Pend Oreille, which helped segregate cladocerans from mysid predation. Kokanee dry otolith coding was evaluated to provide a reliable long-term mark. Analysis of daily growth increments on otoliths was used successfully in 1987 to differentiate fry from various release sites. The technique will be refined during 1988 to include coding fry otoliths with water temperature fluctuations during hatchery residence. 23 refs., 20 figs., 2 tabs.

  2. Pompton Lakes Photo Gallery

    EPA Pesticide Factsheets

    This gallery provides representative photographs of the soil removal and dredging operations within the Pompton Lake Study Area (PLSA) performed starting in 2016 through the present. It will be periodically updated in conjunction with the progress of the

  3. SPACE-R Thermionic Space Nuclear Power System: Design and Technology Demonstration Program. Semiannual technical progress report for period ending March 1993

    SciTech Connect

    Not Available

    1993-05-01

    This Semiannual Technical Progress Report summarizes the technical progress and accomplishments for the Thermionic Space Nuclear Power System (TI-SNPS) Design and Technology Demonstration Program of the Prime Contractor, Space Power Incorporated (SPI), its subcontractors and supporting National Laboratories during the first half of the Government Fiscal Year (GFY) 1993. SPI`s subcontractors and supporting National Laboratories include: Babcock & Wilcox for the reactor core and externals; Space Systems/Loral for the spacecraft integration; Thermocore for the radiator heat pipes and the heat exchanger; INERTEK of CIS for the TFE, core elements and nuclear tests; Argonne National Laboratories for nuclear safety, physics and control verification; and Oak Ridge National laboratories for materials testing. Parametric trade studies are near completion. However, technical input from INERTEK has yet to be provided to determine some of the baseline design configurations. The INERTEK subcontract is expected to be initiated soon. The Point Design task has been initiated. The thermionic fuel element (TFE) is undergoing several design iterations. The reactor core vessel analysis and design has also been started.

  4. An investigation of the mechanism of IGA/SCC of alloy 600 in corrosion accelerating heated crevice environments. Quarterly Technical Progress Report No. 4 for the period May 1, 2000 through July 31, 2000

    SciTech Connect

    Dr. Jesse Lumsden

    2000-07-31

    OAK-B135 An investigation of the mechanism of IGA/SCC of alloy 600 in corrosion accelerating heated crevice environments. Quarterly Technical Progress Report No. 4 for the period May 1, 2000 through July 31, 2000

  5. Paleolimnological Evaluation of Lake Chapala (Western Mexico) During the Past 10,000 Years (CONACYT CB2011, Grant 168685, In Progress). PHASE II: Laboratory Work: First Results.

    NASA Astrophysics Data System (ADS)

    Zarate, P. F.; Israde-Alcantara, I.; Dorfler, W.; Unkel, I. B.; Dominguez Vazquez, G.; Nelle, O.; Espinoza Encinas, I. R.

    2015-12-01

    At Lake Chapala (103° 02'W, 20° 15'N) a linear sedimentation rate of 2 mm a-1 for the last 12,000 years was deduced from ten 14C dates. Due to the presence of very old hydrothermal bitumen (14C date: >40,000 years BP) a reservoir effect of c. 2000 years must be taken into account. Pollen results indicate a generally increase in dry forest taxa with an interruption during the middle Holocene. Diatom results allow a zonation into 6 paleoenvironmental phases. Zone 1: From 27 to 26m depth (c. 12,000 yBP), Stephanodiscus niagaraeis the dominant taxa in coincidence with high TOC percents; a transgression into moister conditions is indicated. Zone 2: From 26 to 17m (10,310-8720 cal BP) it is characterized by Aulacoseira granulata indicating an increase in ionic conditions and turbidity in lake as result of a decrease in lacustrine levels. Zone 3: From 17 to 13m (8720-5950 cal BP) it is dominated by C. aff. kuetzingiana and the presence of temperate pollen taxa at 12 m (ca. 5000 YBP) suggest an increase in humid conditions in this interval. Zone 4: From 13 to 8.5m (5950-2840 cal BP) encompass the middle Holocene. Stephanodiscus medius alternating with Surirella ovalis characterize this period and indicate very fluctuant conditions in coincidence with at a decrease of low TOC percents. Zone 5: From 8.5 to 4m (2840-1580 cal BP), mark the establishment of modern conditions until present, with a peak in S. ovalis in coincidence with the high A. granulata, indicating low lake, saline, turbid and more extreme conditions at the base and top of this interval. Zone 6: From 4 to 0m (1580 cal BP to Present) S. medius (over 50%), C. aff. dubius (20 to 40%), perifitic diatoms in low percents (<5%), and A. granulata and S.ovallis in spite of few percents, are observed in concordance with a return of saline conditions of the lake, indicate a regressive phase. Magnetic (susceptibility and paleomagnetism), microprobe analyses on tephra levels, X-ray Fluorescence (XRF) and Difraction (XRD

  6. Kokanee Stock Status and Contribution of Cabinet Gorge Hatchery, Lake Pend Oreille, Idaho, 1986 Annual Progress Report.

    SciTech Connect

    Bowles, Edward C.

    1987-02-01

    Estimated kokanee (Oncorhynchus nerka) abundance in Lake Pend Oreille was 4.3 million during September 1986. This estimate was similar to 1985 and indicates continued suppression of the kokanee population since initial decline in the late 1960s. Atypically high survival of wild fry resulted in similar fry recruitment in 1986 as 1985, whereas hatchery-reared fry contributed only 8% to total fry recruitment as a result of low post-release survival (3%). Fry released into the Clark Fork River from Cabinet Gorge Hatchery had very low survival during emigration to Lake Pend Oreille, resulting from poor flow conditions and potentially high predation. Fry survival during emigration was twice as high during nighttime flows of 16,000 cfs than 7,800 cfs. Emigration also was faster during higher flows. Several marks were tested to differentially mark fry release groups to help determine impacts of flow and other factors on fry survival. Survival of fry marked with tetracycline and fluorescent dye was high (>99%) during the 10-week study. In contrast, survival of fry marked with fluorescent grit marks ranged from 5 to 93%, depending on application pressure and distance from the fry. Retention was high (>96%) for tetracycline and grit marks during the study, whereas dye marks were discernible (100%) for only one week. 23 refs., 20 figs., 10 tabs.

  7. Great Plains Coal Gasification Project: Quarterly technical progress report, April-June 1988 (Fourth fiscal quarter, 1987-1988)

    SciTech Connect

    Not Available

    1988-07-29

    This progress report describes the operation of the Great Plains Gasification Plant, including lignite coal production, SNG production, gas quality, by-products, and certain problems encountered. (LTN)

  8. Preliminary design and assessment of a 50,000-BPD coal-to-methanol-to-gasoline plant. Quarterly technical progress report, 1 April 1982-30 June 1982

    SciTech Connect

    Not Available

    1982-01-01

    The technical efforts associated with the Statement of Work for the preliminary design and assessment of a 50,000-BPD Coal-to-Methanol-to-Gasoline Plant continued at an accelerated rate. Physical accomplishment increased from 39.6% (March 1982) to 69.1% (June 1982). All contracts were in place prior to the commencement of this quarter and the only significant contractual action bearing on Statement of Work requirements was DOE's approval of a Grace request for modification of the Dames and Moore Subcontract to recognize certain additions and/or expansions resulting from the scoping meeting process. The narrative of this report discusses progress of work associated with technical activities for both the 50,000-BPD and 12,500-BPD plants. Significant progress in the process and mechanical design was achieved following the receipt of all design packages and data from vendors for incorporation in process design documentation. This information enabled the preparation of all process and utility flow diagrams, plot plans, evaluations, and associated direct capital cost estimates for the 50,000-BPD plant. The basic design of all process units comprising the Gasoline Plant was completed, and engineering efforts directed toward supplying inputs for the development of capital and operating cost estimates and economic assessments. Development of engineering documentation for the 12,500-BPD plant was initiated and progressed significantly during the quarter. Development of capital and operating cost estimates for the smaller plant was also active.

  9. CO{sub 2} HUFF-n-PUFF process in a light oil shallow shelf carbonate reservoir. Quarterly technical progress report, [January 1, 1995--March 31, 1995

    SciTech Connect

    Cole, R.; Prieditis, J.; Vogt, J.; Wehner, S.

    1995-04-21

    The principal objective of the Central Vacuum Unit (CVU) CO{sub 2} Huff-n-Puff (H-n-P) project is to determine the feasibility and practicality of the technology in a waterflooded shallow shelf carbonate environment. The results of parametric simulation of the CO{sub 2} H-n-P process, coupled with the CVU reservoir characterization components will determine if this process is technically and economically feasible for field implementation. The technology transfer objective of the project is to disseminate the knowledge gained through an innovative plan in support of the Department of Energy`s (DOE) objective of increasing domestic oil production and deferring the abandonment of shallow shelf carbonate (SSC) reservoirs. Technical progress is reported for geostatitical realizations; paramatric simulation; waterflood review; and reservoir characterization.

  10. CO{sub 2} Huff-n-Puff process in a light oil shallow shelf carbonate reservoir. Second quarterly technical progress report, [April 1995--June 1995

    SciTech Connect

    Cole, R.; Prieditis, J.; Vogt, J.; Wehner, S.

    1995-07-11

    The principal objective of the Central Vacuum Unit (CVU) CO{sub 2} Huff-n-Puff (H-n-P) project is to determine the feasibility and practicality of the technology in a waterflooded shallow shelf carbonate environment. The results of parametric simulation of the CO{sub 2} H-n-P process, coupled with the CVU reservoir characterization components will determine if this process is technically and economically feasible for field implementation. The technology transfer objective of the project is to disseminate the knowledge gained through an innovative plan in support of the Department of Energy`s (DOE) objective of increasing domestic oil production and deferring the abandonment of shallow shelf carbonate (SSC) reservoirs. Tasks associated with this objective are carried out in what is considered a timely effort for near-term goals. Technical progress is summarized for; geostatistical realizations; site-specific simulation;waterflood review; and reservoir characterization.

  11. Materials compatibility and lubricants research on CFC-refrigerant substitutes. Quarterly technical progress report, 1 October 1992--31 December 1992

    SciTech Connect

    Hourahan, G.C.; Szymurski, S.R.

    1993-01-01

    The materials Compatibility and Lubricants Research (MCLR) program supports critical research to accelerate the introduction of CFC-refrigerant substitutes. The MCLR program addresses refrigerant and lubricant properties and materials compatibility. The primary elements of the work include data collection and dissemination, materials compatibility testing, and methods development. The work is guided by an Advisory committee consisting of technical experts from the refrigeration and air-conditioning industry and government agencies. Under the current MCLR program the Air-Conditioning and Refrigeration Technology Institute, Inc., (ARTI) is contracting and managing multiple research projects and a data collection and dissemination effort. Preliminary results from these projects are reported in technical progress reports prepared by each researcher.

  12. Materials compatibility and lubricants research on CFC-refrigerant substitutes. Technical progress report, 1 April 1995--30 June 1995

    SciTech Connect

    Szymurski, S.R.; Hourahan, G.C.; Godwin, D.S.; Amrane, K.

    1995-08-01

    The Materials Compatibility and Lubricants Research (MCLR) program supports critical research to accelerate the introduction of CFC and HCFC refrigerant substitutes. The MCLR program addresses refrigerant and lubricant properties and materials compatibility. The primary elements of the work include data collection and dissemination, materials compatibility testing, and methods development. The work is guided by an Advisory Committee consisting of technical experts from the refrigeration and air-conditioning industry and government agencies. The AirConditioning and Refrigeration Technology Institute, Inc., (ARTI) manages and contracts multiple research projects and a data collection and dissemination effort. Detailed results from these projects are reported in technical reports prepared by each subcontractor.

  13. GPHS-RTGs in support of the Cassini mission. Semi annual technical progress report, 2 October 1995--31 March 1996

    SciTech Connect

    1996-04-20

    The technical progress achieved during the period 2 October 1995 through 31 March 1996 on Contract No. DE-AC03-91SF18852, Radioisotope Generators and Ancillary Activities is described herein. This report is organized by the program task structure as follows: spacecraft integration and liaison; engineering support; safety; qualified unicouple fabrication; ETG fabrication, assembly, and test; ground support equipment (GSE); RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance and reliability, contract changes, non-capital CAGO acquisition, and CAGO maintenance; contract acquired government-owned property (CAGO) acquisition; and program calendars.

  14. Final Technical Progress Report: High-Efficiency Low-Cost Thin-Film GaAs Photovoltaic Module Development Program; July 14, 2010 - January 13, 2012

    SciTech Connect

    Mattos, L.

    2012-03-01

    This is the final technical progress report of the High-Efficiency Low-Cost Thin-Film GaAs Photovoltaic Module Development Program. Alta Devices has successfully completed all milestones and deliverables established as part of the NREL PV incubator program. During the 18 months of this program, Alta has proven all key processes required to commercialize its solar module product. The incubator focus was on back end process steps directed at conversion of Alta's high quality solar film into high efficiency 1-sun PV modules. This report describes all program deliverables and the work behind each accomplishment.

  15. POC-scale testing of an advanced fine coal dewatering equipment/technique. Quarterly technical progress report 6, January--March 1996

    SciTech Connect

    Tao, D.; Groppo, J.G.; Parekh, B.K.

    1996-05-03

    Froth flotation technique is an effective and efficient process for recovering of ultra-fine clean coal. Economical dewatering of an ultra-fine clean coal product to a 20% level moisture will be an important step in successful implementation of the advanced cleaning processes. This project is a step in the Department of Energy`s program to show that ultra-clean coal could be effectively dewatered to 20% or lower moisture using either conventional or advanced dewatering techniques. The cost-sharing contract effort is for 36 months beginning September 30, 1994. This report discusses technical progress made during the quarter from January 1- March 31, 1996.

  16. A study of multi-stage/multi-function column for fine particle separation. Quarterly technical progress report, July 8, 1994--September 30, 1994

    SciTech Connect

    Chiang, Shiao-Hung

    1995-01-20

    The overall objective of the proposed research program is to explore the potential application of a new invention involving a multi-stage column equipped with vortex-inducing loop-flow contactors (hereafter referred to as the multi-stage flotation column) for fine coal cleaning and other solid-solid separations. The research work will identify the design parameters and their effect on the performance of the separation process. The results of this research will provide a basis for further development of the technology. In the past three months, the efforts focused on project planning and design of test equipment. A description of technical progress is presented.

  17. Development of vanadium-phosphate catalysts for methanol production by selective oxidation of methane. Quarterly technical progress report 4, July--September 1993

    SciTech Connect

    McCormick, R.L.; Jha, M.C.; Streuber, R.D.

    1993-12-07

    This document is the fourth quarterly technical progress report under Contract No. DE-AC22-92PC92110, {open_quotes}Development of Vanadium-Phosphate Catalysts for Methanol Production by Selective Oxidation of Methane.{close_quotes} During this quarter, the authors focused primarily on catalyst activity testing in the microreactor. Additional blank runs using methane and methanol were performed. Initial attempts at preparing a silica supported catalyst are described. These results are discussed in detail and plans for the coming quarter are outlined.

  18. Development of vanadium-phosphate catalysts for methanol production by selective oxidation of methane. Quarterly technical progress report No. 9, April 1995--June 1995

    SciTech Connect

    McCormick, R.L.

    1995-09-14

    This document is the ninth quarterly technical progress report under Contract No. DE-AC22-92PC92110 {open_quotes}Development of Vanadium-Phosphate Catalysts for Methanol Production by Selective Oxidation of Methane{close_quotes}. Activities were focused on fine tuning of the microreactor system by elimination of transport effects and improvements in the analytical system. Process variable studies were conducted on vanadyl pyrophosphate and screening studies were conducted on several modified catalyst. One additional catalyst was prepared and characterization studies continued. These results are reported.

  19. Technical support services to assist the Office of Environmental Audit in conducting the DOE Environmental Survey and to provide technical assistance on Environmental Compliance issues. Technical progress report, February 16, 1990--August 13, 1990

    SciTech Connect

    1995-07-01

    NUS received authorization from DOE on August 14, 1987 to provide technical support services to assist the Office of Environmental Audit (OEV) in conducting the DOE Environmental Survey and to provide technical assistance on environmental compliance issues. The overall contract is to accomplish a one-time, no-fault baseline Survey of all DOE operating facilities, and to provide technical assistance and support for the resolution of environmental compliance issues. NUS has completed the Preliminary Reports and continues to support DOE on the Prioritization and Tiger Team Assessment efforts. The project requires a broad range of environmental protection expertise, necessitating senior-level personnel as the primary project staff. Many of the tasks assigned by DOE require quick startup and performance, and several tasks may be active at any one time.

  20. Career and Technical Education: States Aligning Programs to Meet Workforce Needs. The Progress of Education Reform. Volume 15, Number 2

    ERIC Educational Resources Information Center

    Zinth, Jennifer Dounay

    2014-01-01

    Across the 50 states, career and technical education (CTE) programs at the K-12 and postsecondary levels have seen enormous policy action - 2013 alone saw at least 78 substantive policy changes via legislation, state board rules and executive orders specific to CTE and workforce development. What are the drivers behind this sudden policymaker…

  1. Career/Technical Education: Not Your Father's Vocational Education. The Progress of Education Reform. Volume 14, Number 1

    ERIC Educational Resources Information Center

    Zinth, Jennifer Dounay

    2013-01-01

    In recent years, career/technical education (CTE) has risen to the top of the education policy agenda for governors, legislators, and agency heads. As a result of informed interest among key education leaders, the CTE policies and programs being advocated and implemented today bear little resemblance to those in place not long ago. Among the…

  2. New York City School Survey 2008-2010: Assessing the Reliability and Validity of a Progress Report Measure. Technical Appendices

    ERIC Educational Resources Information Center

    Nathanson, Lori; Cole, Rachel; Kemple, James J.; Lent, Jessica; McCormick, Meghan; Segeritz, Micha

    2013-01-01

    The Research Alliance for New York City Schools examined Department of Education (DOE) School Survey data from 2008-2010 to better understand the richness and complexities of the information elicited by the Survey from parents, students, and teachers. This document provides the appendices to the technical report "New York City School Survey…

  3. New York City School Survey 2008-2010: Assessing the Reliability and Validity of a Progress Report Measure. Technical Appendices

    ERIC Educational Resources Information Center

    Nathanson, Lori; Cole, Rachel; Kemple, James J.; Lent, Jessica; McCormick, Meghan; Segeritz, Micha

    2013-01-01

    The Research Alliance for New York City Schools examined Department of Education (DOE) School Survey data from 2008-2010 to better understand the richness and complexities of the information elicited by the Survey from parents, students, and teachers. This document provides the appendices to the technical report "New York City School Survey…

  4. Bench-scale testing of on-line control of column flotation using a novel analyzer. Second quarterly technical progress report, January 1, 1993--March 31, 1993

    SciTech Connect

    Not Available

    1993-04-16

    This document contains the second quarterly technical progress report for PTI`s Bench-Scale Testing Project of a circuit integrating PTI`s KEN-FLOTE{trademark} Column Flotation Technology and PTI`s On-Line Quality Monitor and Control System. The twelve-month project involves installation and testing of a 200--300 lb/hr. bench-scale testing circuit at PETC`s Coal Preparation Process Research Facility (CPPRF) for two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). The project schedule timeline by task series for the twelve month project, as it was laid out in the initial Project Work Plan. At the present time, all tasks are progressing according to schedule with the exception of the Task 800 Circuit Testing and Sample Prep and Task 1000 Circuit Decommissioning, which have slipped approximately five weeks due to delays incurred within in the project.

  5. Design, construction, operation, and evaluation of a prototype culm-combustion boiler/heater unit. Quarterly technical progress report, October 1-December 31, 1980

    SciTech Connect

    Not Available

    1981-02-01

    This report provides a summary of the work performed on the Prototype Culm Combustion Boiler/Heater Unit, Phase I - Engineering Design and Analysis and Phase II - Prototype Plant Construction during the period October 1, 1980 through December 31, 1980. The objectives of the program as well as the technical progress and problem areas encountered during the reporting period are presented. The final detail design effort was completed and the final design report submitted. Progress on procurement activity authorized by full Phase II release on March 20, 1980, is discussed. Following approval by DOE, a purchase order was placed with the Norflor Construction Corporation for the prototype plant construction which began in November. Construction of the access roadway installation of the electric power, sewer and water lines was completed during this reporting period. Boiler construction continued.

  6. Technical support services to assist the Office of Environmental Audit in conducting the DOE Environmental Survey and to provide technical assistance on Environmental Compliance issues. Technical progress report, February 16, 1991--August 16, 1991

    SciTech Connect

    1995-07-01

    HALLIBURTON NUS received authorization from DOE on August 14, 1987 to provide technical support to assist the Office of Environmental Audit (OEV) in conducting the DOE Environmental Survey and to provide technical assistance on environmental compliance issues. The overall contract is to accomplish a one-time, no-fault baseline Survey of all DOE operating facilities, and to provide technical assistance and support for the resolution of environmental compliance issues. NUS has completed the Preliminary Reports and continues to support DOE on the Prioritization and Tiger Team Assessment efforts. The project requires a broad range of environmental protection expertise, necessitating senior-level personnel as the primary project staff. Many of the tasks assigned by DOE require quick startup and performance, and several tasks may be active at any one time. The objective of the DOE Environmental Survey Program is to identify and prioritize areas of existing environmental risk at 36 DOE facilities. NUS`role is to technically assist the Office of Environmental Audit in the implementation of the Surveys.

  7. Technical support services to assist the Office of Environmental Audit in conducting the DOE Environmental Survey and to provide technical assistance on Environmental Compliance issues. Technical progress report, August 14, 1990--February 15, 1991

    SciTech Connect

    1995-07-01

    NUS received authorization from DOE on August 14, 1987 to provide technical support services to assist the Office of Environmental Audit (OEV) in conducting the DOE Environmental Survey and to provide technical assistance on environmental compliance issues. The overall contract is to accomplish a one-time, no-fault baseline Survey of all DOE operating facilities, and to provide technical assistance and support for the resolution of environmental compliance issues. NUS has completed the Preliminary Reports and continues to support DOE on the Prioritization and Tiger Team Assessment efforts. The project requires a broad range of environmental protection expertise, necessitating senior-level personnel as the primary project staff. Many of the tasks assigned by DOE require quick startup and performance, and several tasks may be active at any one time. The objective of the DOE Environmental Survey Program is to identify and prioritize areas of existing environmental risk at 36 DOE facilities. NUS`role is to technically assist the Office of Environmental Audit in the implementation of the Surveys.

  8. Search for major genes with progeny test data to accelerate the development of genetically superior loblolly pine. Technical progress report

    SciTech Connect

    2000-02-15

    This report details the progress of the three tasks of this project. The tasks are: (1) develop genetic models and analytical methods; (2) molecular confirmation of major gene segregation; and (3) develop strategies for marker-assisted breeding.

  9. STATUS OF MYSIS RELICTA IN LAKE SUPERIOR

    EPA Science Inventory

    The status of different components of the lower food web is reported for Lake Superior. Results are preliminary summaries from the Binational collaboration in 2005, which measured the lower food web at the request of the Lake Superior Fisheries Technical Committee and Lake Superi...

  10. A systematic assessment of the state of hazardous waste clean-up technologies. Quarterly technical progress report, April 1--June 30, 1993

    SciTech Connect

    Berg, M.T.; Reed, B.E.; Gabr, M.

    1993-07-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushing (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming.

  11. Development and evaluation of supercritical fluid chromatography/mass spectrometry for polar and high-molecular-weight coal components. Technical progress report

    SciTech Connect

    Chess, E.K.; Smith, R.D.

    1986-01-01

    This Technical Progress Report reviews the technical progress made over the first 18 months of the program. Our goals include the design, development, and evaluation of a combined capillary column supercritical fluid chromatograph/high-performance mass spectrometer capable of analyzing high-molecular-weight polar materials and evaluating the system's potential for application in coal conversion process monitoring. The program includes not only the development and evaluation of the required instrumentation, but the development of polar fluids and compatible chromatographic stationary phases needed for efficient separation and analysis of polar and high-molecular-weight compounds. A new chromatograph/mass spectrometer interface and new mass spectrometer ion source have been designed, constructed, and evaluated using low-polarity supercritical fluids such as pentane. Results from the evaluations have been used to modify the instrumentation to improve performance. The design and fabrication of capillary flow restrictors from fused silica tubing has been explored. Research has also been conducted toward advancing the technology of fabricating high-performance chromatographic columns suitable for use with polar supercritical fluids. Results to date support our initial belief that high-resolution supercritical fluid chromatography (SFC)/high-performance mass spectrometry (MS) will provide a significantly enhanced analytical capability for broad classes of previously intractable fuel components. 10 refs., 13 figs.

  12. Kokanee Stock Status and Contribution of Cabinet Gorge Hatchery, Lake Pend Oreille, Idaho, 1990 Annual Progress Report.

    SciTech Connect

    Paragamian, Vaughn L.

    1991-03-01

    Rehabilitation of kokanee Oncorhynchus nerka in Lake Pend Oreille met with some success in 1990, but unexpected results have raised new questions. Estimated kokanee abundance during late August of 1990 was about 6.9 million fish. This is a decline of 19% from 1989, a continued decrease since 1988. The decreased population was attributed to low stocking of hatchery fry (7.3 million), lower wild fry survival in 1990 (1.5%), and exceptionally poor survival of fish ages 3+ and 4+. Average survival of the older fish was only 11% in 1990 compared to 72% in prior years. Compensatory survival was noted for kokanee ages 1+ and 2+, with an average of 81% in 1990 compared to 44% in 1989. Hatchery fry comprised 47% of the total kokanee fry recruitment in 1990 (80% of fry biomass). This contribution ranked third behind 1988 and 1989 since hatchery supplementation began in the 1970s. Survival of hatchery fry was 20%, the second highest since this investigation began. Findings of 1990 indicate a more comprehensive approach to managing kokanee must take into account predator stockings and predator/prey interaction. An unexpected low adult escapement was responsible for an egg-take of only 5.6 million eggs in 1990, 58% of the previous year, which will limit experimental stocking in 1991. Modification of the fish ladder at the Cabinet Gorge Fish Hatchery to improve adult escapement is strongly recommended to increase egg-take. 27 refs., 28 figs., 6 tabs.

  13. IGR NO{sub x}/SO{sub x} control technology. Second technical progress report, January 1--March 31, 1993

    SciTech Connect

    Not Available

    1993-04-25

    The technical work during this reporting term has principally involved the continued development, optimization and improvement of freezing drying techniques for solid ceramic oxide electrolyte powder preparation, preliminary optimization of the calcining of the ceramic electrolyte freeze dried powders to allow for optimum processing to the IGR composite, and determining (initial) electrochemical properties of the stabilized ceramic solid electrolyte at a variety of temperatures in air.

  14. Development and process evaluation of improved Fischer-Tropsch slurry catalysts. Quarterly technical progress report, 1 July--30 September 1988

    SciTech Connect

    Withers, H.P.; Bukur, D.B.; Rosynek, M.P.

    1988-12-31

    The objective of this contract is to develop a consistent technical data base on the use of iron-based catalysts in Fischer-Tropsch (F-T) synthesis reactions. This data base will be developed to allow the unambiguous comparison of the performance of these catalysts with each other and with state-of-the-art iron catalyst compositions. Particular attention will be devoted to generating reproducible kinetic and selectivity data and to developing reproducible improved catalyst compositions.

  15. Development and process evaluation of improved Fischer-Tropsch slurry catalysts. Quarterly technical progress report, 1 October--31 December 1988

    SciTech Connect

    Withers, H.P.; Bukur, D.B.; Rosynek, M.P.

    1988-12-31

    The objective of this contract is to develop a consistent technical data base on the use of iron-based catalysts in Fischer-Tropsch (FT) synthesis reactions. This data base will be developed to allow the unambiguous comparison of the performance of these catalysts with each other and with state-of-the-art iron catalyst compositions. Particular attention will be devoted to generating reproducible kinetic and selectivity data and to developing reproducible improved catalyst compositions.

  16. Development and process evaluation of improved Fischer-Tropsch slurry catalysts. Quarterly technical progress report, 1 October-31 December 1987

    SciTech Connect

    Withers, H.P.; Bukur, D.B.; Rosynek, M.P.

    1987-12-31

    The objective of this contract is to develop a consistent technical data base on the use of iron-based catalysts in Fischer-Tropsch (FT) synthesis reactions. This data base will be developed to allow the unambiguous comparison of the performance of these catalysts with each other and with state-of-the-art iron catalyst compositions. Particular attention will be devoted to generating reproducible kinetic and selectivity data and to developing reproducible improved catalyst compositions.

  17. Development of process evaluation of improved Fischer-Tropsch slurry catalysts. Quarterly technical progress report, 1 April--30 June 1988

    SciTech Connect

    Withers, H.P.; Bukur, D.B.; Rosynek, M.P.

    1988-12-31

    The objective of this contract is to develop a consistent technical data base on the use of iron-based catalysts in Fischer-Tropsch (FT) synthesis reactions. This data base will be developed to allow the unambiguous comparison of the performance of these catalysts with each other and with state-of-the-art iron catalyst compositions. Particular attention will be devoted to generating reproducible kinetic and selectivity data and to developing reproducible improved catalyst compositions.

  18. Float zone silicon sheet growth. Technical progress report quarterly report No. 8, July 1, 1995--September 30, 1995

    SciTech Connect

    Bleil, C.E.

    1995-12-01

    Research continued on float zone silicon sheet growth. Progress is described in the following 8 tasks: heat pipe construction; heat pipe heater and heat extraction system; optical temperature monitoring system; replenishment source development; RF electrode assembly; solid-liquid interface monitors; ribbon seed preparation; and overall system assembly.

  19. Superior catalysts for selective catalytic reduction of nitric oxide. Quarterly technical progress report, January 1, 1995--March 31, 1995

    SciTech Connect

    Li, W.B.; Yang, R.T.

    1995-12-01

    During this quarter, progress was made on the following tasks: TPD techniques were employed to study the reaction mechanism of the selective catalytic reduction of nitrogen oxide with ammonia over iron oxide pillared clay catalyst; and a sulfur dioxide resistant iron oxide/titanium oxide catalyst was developed.

  20. Gamma scattering in condensed matter with high intensity Moessbauer radiation. Final technical progress report, January 16, 1993--January 15, 1996

    SciTech Connect

    1997-06-01

    Progress is reported on work with high intensity radiation. Moessbauer radioisotopes of exceptional high intensity have been the source of photons for most experiments. Topics include lattice dynamics, studies of glass forming liquids, and line-shape and it`s role in finding materials and nuclear parameters.