Science.gov

Sample records for large hydroelectric power

  1. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    PubMed

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  2. Dynamics of large-diameter water pipes in hydroelectric power plants

    NASA Astrophysics Data System (ADS)

    Pavić, G.; Chevillotte, F.; Heraud, J.

    2017-04-01

    An outline is made of physical behaviour of water - filled large pipes. The fluid-wall coupling, the key factor governing the pipe dynamics, is discussed in some detail. Different circumferential pipe modes and the associated cut-on frequencies are addressed from a theoretical as well as practical point of view. Major attention is paid to the breathing mode in view of its importance regarding main dynamic phenomena, such as water hammer. Selected measurement results done at EDF are presented to demonstrate how an external, non-intrusive sensor can detect pressure pulsations of the breathing mode in a pressure pipe. Differences in the pressure measurement using intrusive and non-intrusive sensors reveal the full complexity of large-diameter pipe dynamics.

  3. Soil erosion and sediment delivery issues in a large hydro-electric power reservoir catchment, Ethiopia

    NASA Astrophysics Data System (ADS)

    Nebiyu, Amsalu; Dume, Bayu; Bode, Samuel; Ram, Hari; Boeckx, Pascal

    2017-04-01

    restoration and reduction of sediment flux are considered. The long term sustainability of HEP power generation in Ethiopia is evaluated in this context.

  4. ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  5. PLANAR VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLANAR VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS SOUTHEAST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  6. CRANE WINCH MECHANISM, UPPER LEVEL OF HYDROELECTRIC POWER HOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CRANE WINCH MECHANISM, UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  7. VIEW OF SOUTHEAST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF SOUTHEAST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS NORTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  8. OBLIQUE VIEW OF NORTHEAST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE VIEW OF NORTHEAST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS WEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  9. OBLIQUE VIEW OF NORTHWEST AND NORTHEAST SIDES OF HYDROELECTRIC POWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE VIEW OF NORTHWEST AND NORTHEAST SIDES OF HYDROELECTRIC POWER HOUSE, OLD BYPASS IN BACKGROUND, VIEW TOWARDS SOUTH - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  10. OBLIQUE VIEW OF SOUTHWEST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE VIEW OF SOUTHWEST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER HOUSE WITH DAM TO LEFT OF HYDROELECTRIC POWER HOUSE AND ENTRANCE TO OLD LOCK CHAMBER ON RIGHT, VIEW TOWARDS NORTH - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  11. VERTICAL DETAIL OBLIQUE VIEW OF NORTHEAST SIDE OF HYDROELECTRIC POWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VERTICAL DETAIL OBLIQUE VIEW OF NORTHEAST SIDE OF HYDROELECTRIC POWER HOUSE WITH OLD BYPASS IN FOREGROUND, SHOWING GLASS BLOCKS PROVIDING LIGHT TO BASEMENT OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS WEST SOUTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  12. Environmental requirements at hydroelectric power plants

    SciTech Connect

    Cada, G.F.; Francfort, J.E.

    1993-12-31

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour.

  13. Small-Scale Hydroelectric Power Demonstration Project

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  14. OBLIQUE VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE AND INTERIOR OF SOUTHWEST CORNER OF OLD BYPASS IN FOREGROUND, VIEW TOWARDS SOUTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  15. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... hydroelectric power projects and providing information affecting cost and availability of power to the power... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Coordination of hydroelectric... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This...

  16. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... hydroelectric power projects and providing information affecting cost and availability of power to the power... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Coordination of hydroelectric... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This...

  17. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... hydroelectric power projects and providing information affecting cost and availability of power to the power... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Coordination of hydroelectric... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This...

  18. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... hydroelectric power projects and providing information affecting cost and availability of power to the power... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Coordination of hydroelectric... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This...

  19. Dam of the Kolyma Hydroelectric Power Plant (Plotina Kolymskoi Ges),

    DTIC Science & Technology

    1976-12-01

    This report discusses the variety of problems and conditions which complicated the planning and construction of the Kolyma Hydroelectric power plant . This report was written before actual construction began. (Author)

  20. Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates & Gate-Lifting Mechanisms, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA

  1. Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate House, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA

  2. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Coordination of hydroelectric... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This regulation establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric...

  3. Recent Trends of Hydroelectric Power Plant Equipment and Maintenance

    NASA Astrophysics Data System (ADS)

    Mino, Yoshiaki; Honda, Seiji; Nakazawa, Nobuhiro

    The equipment of hydroelectric power plants has been improving typically by using digital technology and eliminating oil for lubrication and control. According to the investigation executed by the committee of IEEJ, a fault/trouble happened in one equipment in a hydroelectric power plant has decreased to less than once in 5 years due to such improvement and advancement of design and manufacturing technologies. As for maintenance, changing to the condition based maintenance from the time based maintenance has been in progress. Developing diagnostic technologies and the analysis of operating data to understand the condition of the equipment are important.

  4. Oblique view of southwest and southeast sides of hydroelectric power ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Oblique view of southwest and southeast sides of hydro-electric power house with upstream side of dam to left and concrete pylon at upper entrance to lock on right, view towards north - St. Lucie Canal, St. Lucie Lock No. 1, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  5. PLANAR VIEW OF NORTHEAST SIDE OF HYDROELECTRIC POWER HOUSE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLANAR VIEW OF NORTHEAST SIDE OF HYDRO-ELECTRIC POWER HOUSE AND SOUTHWEST END OF DREDGE BYPASS IN FOREGROUND, VIEW TOWARDS SOUTHWEST. - St. Lucie Canal, Lock No. 2, Dredge Bypass, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  6. Impact of High Wind Power Penetration on Hydroelectric Unit Operations

    SciTech Connect

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-01-01

    The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

  7. Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS

    SciTech Connect

    Hodge, B.-M.; Lew, D.; Milligan, M.

    2011-07-01

    This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

  8. Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint

    SciTech Connect

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-10-01

    This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

  9. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-21

    ... Energy Regulatory Commission Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project... that could be affected by issuance of a new license for the Otter Creek Hydroelectric Project No. 2558..., as applicant for the Otter Creek Hydroelectric Project, has expressed an interest in this...

  10. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Energy Regulatory Commission Alabama Power Company; Holt Hydroelectric Project; Notice of Revised... new license for the Holt Hydroelectric Project No. 2203. The programmatic agreement, when executed by... a ] restricted service list for the Holt Hydroelectric Project. On June 21, 2012, the Choctaw...

  11. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Energy Regulatory Commission Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of... that could be affected by issuance of a new license for the Bartletts Ferry Hydroelectric Project No... list for the Bartletts Ferry Hydroelectric Project. On June 14, 2012, the Kialegee Tribal...

  12. Study on safety operation for large hydroelectric generator unit

    NASA Astrophysics Data System (ADS)

    Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.

    2012-11-01

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  13. Integration of hydroelectric power and apiary management. Final report

    SciTech Connect

    Mitchell, C.

    1983-06-19

    Appropriate Technology Grant 3-80-342 is an attempt to integrate hydroelectric power with apiary management. The biggest challenge to the efficient completion of the project was connecting with the appropriate technology and associated personel to guide the project. Most of the so called ''experts'' in this field are at an early experimental stage in technology and knowledge. The existing system is capable of generating ample electricity six to seven months out of the year. The unit was operating consistantly near the end of winter. At present, it is not running due to lack of sufficient water.

  14. Waved core lamination techniques on large and bulb hydroelectric machinery

    SciTech Connect

    Lehoczky, K.N. )

    1988-12-01

    Stator core lamination of large hydroelectric generators and motors and especially bulb type machines are often exposed to heat expansion forces causing severe damages. The temperature difference between the warm core lamination and the relatively colder stator frame, creates both radial and tangential stresses in these components. The consequence of these stresses depends on the axial prestressing of lamination and the internal design of the core. An overriding of some critical combination of these stresses may result in buckling of lamination, fracture of core tensioning and supporting components or cracks in the stator frame. The present waved lamination technique reduces the tangential and radial spring constant of core and prevents the damages. The research performed through theoretical and experimental methods, indicates a fundamental change in the behavior of core. The waved lamination was successfully used in a large number of machines, providing the reliability and wide application range of the method.

  15. Hydroelectric power in Hawaii. A report on the statewide survey of potential hydroelectric sites

    SciTech Connect

    Beck, C. A.

    1981-02-01

    An assessment was made of the hydropower potential in Hawaii. The major conclusion of this study is that hydropower resources in the State of Hawaii are substantial, and they offer the potential for major increases in hydropower generating capacity. Hydropower resources on all islands total about 50 MW of potential generating capacity. Combined with the 18 MW of existing hydropower capacity, hydropower resources potentially could generate about 307 million kWh of electric energy annually. This represents about 28% of the present combined electricity needs of the Neighbor Islands, Kauai, Molokai, Maui, and the Big Island. Hydropower resources on Kauai equal 72% of that island's electricity needs; on Molokai, 40%, on the Big Island, 20%; and on Maui, 18%. The island of Oahu, however, has only small hydropower resources, and could only generate a negligible portion of its electricity needs from this energy source. A summary of existing and future (potential) hydropower capacities and estimated annual outputs for each island is presented. How much of the potential capacity is being actively considered for development and how much is only tentatively proposed at the time is indicated. The economics of hydropower at specific sites were analyzed. The major conclusion of this analysis is that hydropower development costs vary widely among the different sites, but that generally the cost of hydroelectric power is either less than or comparable to the cost of oil-fired power.

  16. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... Energy Regulatory Commission Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1... Soliciting Comments and Motions To Intervene On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric...; Christine M. Miller, Brown Bear Power LLC, 200 Clarendon Street 55th Floor, Boston MA 02116, (617) 531- 6338...

  17. Data Indicating Malfunction Sign of Hydroelectric Power Plants

    NASA Astrophysics Data System (ADS)

    Onoda, Takashi; Ito, Norihiko; Koreeda, Hideaki

    Kyushu Electric Power Co., Inc. collects different types of sensor data and weather information to maintain the safety of hydroelectric power plants while the plants are in operation. We have to identify malfunction signs from among the collected sensor data. In this paper, we describe a method for identifying the conditions that could cause a malfunction; our method consists of two identification stages. In the first stage, we identify malfunction signs, which are different from normal-condition data, and in the second stage, we monitor aging degradation. Our proposed method is based on the use of a one-class support vector machine and a normal support vector machine. The experimental results obtained in this study show that our proposed method can be employed to identify malfunction signs, which are different from normal-condition data, and to monitor aging degradation.

  18. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    ERIC Educational Resources Information Center

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  19. Hydroelectric power: Technology and planning. (Latest citations from the Selected Water Resources Abstracts database). Published Search

    SciTech Connect

    Not Available

    1993-08-01

    The bibliography contains citations concerning hydroelectric power technology and planning. Reservoir, dam, water tunnel, and hydraulic gate design, construction, and operation are discussed. Water supply, flood control, irrigation programs, and environmental effects of hydroelectric power plants are presented. Mathematical modeling and simulation analysis are also discussed. (Contains 250 citations and includes a subject term index and title list.)

  20. Hydroelectric power: Technology and planning. (Latest citations from the Selected Water Resources Abstracts database). Published Search

    SciTech Connect

    Not Available

    1994-05-01

    The bibliography contains citations concerning hydroelectric power technology and planning. Reservoir, dam, water tunnel, and hydraulic gate design, construction, and operation are discussed. Water supply, flood control, irrigation programs, and environmental effects of hydroelectric power plants are presented. Mathematical modeling and simulation analysis are also discussed. (Contains 250 citations and includes a subject term index and title list.)

  1. 76 FR 6820 - Contract for Hydroelectric Power Development at the C-Drop, a Feature of the Klamath Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Bureau of Reclamation Contract for Hydroelectric Power Development at the C-Drop, a Feature of the... accept proposals, select one lessee, and contract for hydroelectric power development at the Klamath... consider proposals for non-Federal development of hydroelectric power at C-Drop of the Klamath Project...

  2. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  3. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  4. 78 FR 48185 - Notice of Intent To Contract for Hydroelectric Power Development on the San Juan-Chama Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ..., 4P10000] Notice of Intent To Contract for Hydroelectric Power Development on the San Juan-Chama Project..., select lessee, and contract for hydroelectric power development on the San Juan-Chama Project. SUMMARY... development of hydroelectric power on the San Juan-Chama Project at any or all of the conduit locations...

  5. Mathematical modeling of vibrations in turbogenerator sets of Sayano-Shushenskaya Hydroelectric Power Station

    NASA Astrophysics Data System (ADS)

    Leonov, G. A.; Kuznetsov, N. V.; Solovyeva, E. P.

    2016-02-01

    Oscillations in turbogenerator sets, which consist of a synchronous generator, a hydraulic turbine, and an automatic speed regulator, are investigated. This study was motivated by the emergency that took place at the Sayano-Shushenskaya Hydroelectric Power Station in 2009. During modeling of the parameters of turbogenerator sets of the Sayano-Shushenskaya Hydroelectric Power Station, the ranges corresponding to undesired oscillation regimes were determined. These ranges agree with the results of the full-scale tests of the hydropower units of the Sayano-Shushenskaya Hydroelectric Power Station performed in 1988.

  6. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act....

  7. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act....

  8. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act....

  9. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act....

  10. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act....

  11. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  12. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ...-Federal development of environmentally sustainable hydropower potential on Federal water resource projects... sustainable, low impact, or small hydropower development that avoids, reduces, or minimizes environmental... Bureau of Reclamation Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project,...

  13. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... attributes which would be adversely affected by hydroelectric development; and (3) The project meets the... hydroelectric development. (d) If the project is located on any segment of a natural watercourse that meets any... for hydroelectric small power production facilities located at a new dam or diversion. 292.208...

  14. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... attributes which would be adversely affected by hydroelectric development; and (3) The project meets the... hydroelectric development. (d) If the project is located on any segment of a natural watercourse that meets any... for hydroelectric small power production facilities located at a new dam or diversion. 292.208...

  15. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... attributes which would be adversely affected by hydroelectric development; and (3) The project meets the... hydroelectric development. (d) If the project is located on any segment of a natural watercourse that meets any... for hydroelectric small power production facilities located at a new dam or diversion. 292.208...

  16. Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regarding hydroelectric power development are discussed.

  17. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    SciTech Connect

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  18. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  19. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of... plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER... partially owned by the Commission shall pay an annual base charge to the Commission. The amount of the...

  20. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of... plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER... partially owned by the Commission shall pay an annual base charge to the Commission. The amount of the...

  1. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of... plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER... partially owned by the Commission shall pay an annual base charge to the Commission. The amount of the...

  2. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of... plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER... partially owned by the Commission shall pay an annual base charge to the Commission. The amount of the...

  3. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of... plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER... partially owned by the Commission shall pay an annual base charge to the Commission. The amount of the...

  4. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ...; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for... Generating Facility Trust No. 1 (co-licensees) and Brown Bear Power, LLC (transferee) filed an application... Partnership: Christine M. Miller, Brown Bear GP, LLC, c/o ArcLight Capital Partners, LLC, 200 Clarendon Street...

  5. The Effect of Hydroelectric Power Plants (hpp) on Agro-Life at Rural Land Regulation in Turkey

    NASA Astrophysics Data System (ADS)

    Onursal Denli, G.; Denli, H. H.; Seker, D. Z.; Bitik, E.; Cetin, S.

    2014-12-01

    Turkey is one of the self-sufficient in foodstuffs and globally ranks as 7th significant agricultural exporter in the world. Main trading partners are the European Union, the United States and the Middle East. As known, agricultural production is dependent on factors including efficient and effective use of all inputs ranging from those natural resources as in land and water to well-trained human resources as labour at the production. The socio-economic aspects of this sector take several forms ranging from the incomes of the primary producers. Rural land regulation is a necessity for rural areas and is regarded as a useful instrument for improving farmer's incomes and life standards. The irrigation system, established during the rural regulation/land consolidation period of large-scale farming, is insufficiently adjusted to the new land tenure structures. The government is especially in the process of water management with hydroelectric power plants. This process produces energy that is required but effects negatively the rivers and agricultural, environmental, climatic conditions. Rivers are vessels of the nature. Free flowing rivers give life to all nature. Most of the studies indicate that Hydroelectric Power Plants (HPP) affects the surface and ground-water management, natural life, agricultural productivity, socio-economic situation at agricultural regions and agro-life related with immigration. This study emphasizes the effect of Hydroelectric Power Plants which are used in transformation of water as a renewable natural resource into electricity power from the perspective of environmental policies and rural regulation.

  6. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  7. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  8. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10)...

  9. Economic valuation of the downstream hydrological effects of land use change: Large hydroelectric reservoirs

    NASA Astrophysics Data System (ADS)

    Aylward, Bruce Allan

    1998-12-01

    Land use change that accompanies economic development and population growth is intended to raise the economic productivity of land. An inevitable by product of this process is the alteration of natural vegetation and downstream hydrological function. This dissertation explores hydrological externalities of land use change in detail, particularly with regard to their economic impact on large hydroelectric reservoirs (LHRs). A review of the linkages between land use, hydrological function and downstream economic activity suggests that on theoretical grounds the net welfare effect of land use change on hydrological function will be indeterminate. Review of the literature suggests that, though the effects of downstream sedimentation will typically be negative, they may often be of little practical significance. The literature on water quantity impacts is sparse at best. This is most surprising in the case of the literature on LHRs where the potentially important and positive effects of increased water yield are typically ignored in favor of simplistic efforts to document the negative effects of reservoir sedimentation. In order to improve the methodological basis for the economic valuation of hydrological externalities, the dissertation considers existing techniques for the evaluation of non-marketed goods and services, clarifying the manner in which they have been and, in the future, may be applied to the topic at hand. A deterministic simulation model is then constructed for the case of LHRs. The model incorporates the effect of changes in water yield, the seasonal pattern of water yield and sedimentation of live and dead storage volumes as they affect reservoir operation and the production of hydroelectricity. The welfare effects of changes in the productivity of the LHR in the short run and changes to the power system expansion plan in the long run are evaluated using the marginal opportunity costs of alternative power sources and power plants, respectively. A case

  10. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... Energy Regulatory Commission Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed... included in, or eligible for inclusion in, the National Register of Historic Places at the Martin Dam....13(e)). The Commission's responsibilities pursuant to section 106 for the Martin Dam...

  11. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By...

  12. Analysis of synchronous and induction generators used at hydroelectric power plant

    NASA Astrophysics Data System (ADS)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  13. Pumped storage for hydroelectric power. (Latest citations from Fluidex data base). Published Search

    SciTech Connect

    Not Available

    1992-09-01

    The bibliography contains citations concerning the design, development, construction, and characteristics of surface and underground pumped storage for hydroelectric power. Pumped storage projects and facilities worldwide are referenced. There is some consideration of research and experimental results of pumped storage studies, as well as modeling. (Contains a minimum of 192 citations and includes a subject term index and title list.)

  14. 76 FR 58837 - Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Reclamation Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power Development at Caballo Dam, Rio Grande Project, New Mexico AGENCY: Bureau of Reclamation, Interior...

  15. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric... of Historic Places at the Martin Dam Hydroelectric Project. The Programmatic Agreement, when...

  16. Water Footprint of Hydroelectricity: A Case Study of Two Large Canadian Boreal Watersheds

    NASA Astrophysics Data System (ADS)

    Irambona, C.; Music, B.; Nadeau, D.; Mahdi, T. F.; Strachan, I. B.

    2015-12-01

    20% of Canada's total freshwater is located in the province of Quebec, where 30% of the country's energy is produced from hydropower. Hydroelectric generation uses a considerable amount of water through evaporation from the reservoirs. The blue water footprint is an indicator of the annual freshwater consumption related to hydropower production. Although environmental effects of reservoir impounding have been previously investigated, their impacts on local and regional evapotranspiration are still not well understood due to the lack of long-term observation data. This study aims to assess the blue water footprint of two large hydroelectric systems located in the Canadian boreal forest. To do so, we use hydro-meteorological data from two specially designed climate simulations (a 'no-reservoir' and a 'post-impoundment' simulation) performed by the fifth generation of the Canadian Regional Climate Model (CRCM5) driven by the ERA-Interim reanalysis. Land-surface processes in the CRCM5 are parameterized by the Canadian Land Surface Scheme (CLASS V3.6), while surface fluxes over the water bodies are simulated by the 1-D lake model (Flake). A 'no-reservoir' and a 'post-impoundment' simulation are carried by adjusting the water fraction on the reservoir grids. Both simulations cover a 42 years period (1970-2012) at 0.11° horizontal resolution, consisting of 300 x 300 grid points centered on the province of Quebec. The two watersheds under study (200 000 km² total) are located in Northern Quebec (49-54°N), Canada, where more than 42% of the province power generation capacity is installed with eight reservoirs covering a total area of 10 000 km². A first validation of the 'post-impoundment' simulation is performed using micrometeorological ground observations, complemented with available hydro-meteorological data from Environment Canada weather stations. Then, each reservoir water footprint is calculated using the 'post-impoundment' simulation. Finally, the net

  17. Development of an HTS hydroelectric power generator for the hirschaid power station

    NASA Astrophysics Data System (ADS)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  18. Engineering and Design: Lifeline Report No. 1, Systems at Risk From Earthquakes, Hydroelectric Power Plant Facilities

    DTIC Science & Technology

    2007-11-02

    and facilities required for continued operation of critical project functions . Lifelines include those facilities essential in providing: (1...1 Missouri River Omaha Nebraska and Missouri 100,000 South Dakota Green Peter 3 North Pacific Portland Oregon S. Santiam 100,000 Greers Ferry 2B...of a major earthquake. The vulnerability of this lifeline function was assessed by a walk-through of three Corps hydroelectric power plants by a team

  19. [The mosquito fauna (Diptera: Culicidae) of the environs of the Sayan-Shushenskoe hydroelectric power station].

    PubMed

    Gornostaeva, R M

    1999-01-01

    Among females and larvae of mosquitoes collected in 1969, 1981-1984 in the area of the Sayan-Shushenskoe hydroelectric power station (140 km up the Yenisei River from the Abakan city) 5 genera and 30 species were recorded. Based on recent collections and reference data (Gornostaeva e. a., 1969; Gornostaeva, Danilov, 1986) the fauna of the region in question includes 31 species of mosquitoes (Anopheles--1, Culiseta--2, Coquillettidia--1, Aedes--22, Culex--5).

  20. Engineering and Design: Fire Protection--Hydroelectric Power Plants

    DTIC Science & Technology

    2007-11-02

    Risk Insurers ( IRI ) National Fire Protection Association (NFPA) National Electrical Code (NEC) National Electrical Manufacturers Association (NEMA...smoke from the powerhouse. Smoke exhaust fans should be installed according to NFPA and IRI requirements and should have a 500 de~ree F ratinq... Dampers , valves and other power operated devices should be configured to provide operation in the smoke control mode in the case of a power outaqe. R

  1. Using fire dynamics simulator to reconstruct a hydroelectric power plant fire accident.

    PubMed

    Chi, Jen-Hao; Wu, Sheng-Hung; Shu, Chi-Min

    2011-11-01

    The location of the hydroelectric power plant poses a high risk to occupants seeking to escape in a fire accident. Calculating the heat release rate of transformer oil as 11.5 MW/m(2), the fire at the Taiwan Dajia-River hydroelectric power plant was reconstructed using the fire dynamics simulator (FDS). The variations at the escape route of the fire hazard factors temperature, radiant heat, carbon monoxide, and oxygen were collected during the simulation to verify the causes of the serious casualties resulting from the fire. The simulated safe escape time when taking temperature changes into account is about 236 sec, 155 sec for radiant heat changes, 260 sec for carbon monoxide changes, and 235-248 sec for oxygen changes. These escape times are far less than the actual escape time of 302 sec. The simulation thus demonstrated the urgent need to improve escape options for people escaping a hydroelectric power plant fire. © 2011 American Academy of Forensic Sciences.

  2. Occupational allergy after exposure to caddis flies at a hydroelectric power plant.

    PubMed Central

    Kraut, A; Sloan, J; Silviu-Dan, F; Peng, Z; Gagnon, D; Warrington, R

    1994-01-01

    A cross sectional survey was conducted in a hydroelectric power plant in which the workforce was exposed to large numbers of caddis flies. 28 of 57 employees participated. About 50% of the participants reported work related eye, nose, and sinus symptoms and wheezing. Working in locations with greater exposure to caddis flies was significantly associated with work related symptoms. 17 workers (61%) were skin prick positive to a laboratory prepared caddis fly antigen (LCFA) made from the remains of caddis flies present in the plant and 11 (39%) had positive reactions to a commercial caddis fly antigen (CCFA). Workers stationed in heavily exposed areas were 3.7 times as likely to have a positive response to the LCFA (p = 0.009) and 5.3 times as likely to have a positive response to the CCFA (p = 0.036). 13 (46%) of survey respondents reported three or more work related symptoms. 10 (91%) CCFA positive workers reported three or more work related symptoms. Pulmonary function studies revealed slight, but not significantly decreased forced vital capacity (FVC), forced expiratory volume in one second (FEV1), and FEV1/FVC ratios in workers who were skin test positive to either caddis fly preparation when compared with those who were negative. One worker who was skin test positive to both antigens had a cross shift fall in FEV1 of 20% predicted. Occupational allergy to caddis flies proved to be a significant health problem at this work site. PMID:8044233

  3. Occupational allergy after exposure to caddis flies at a hydroelectric power plant.

    PubMed

    Kraut, A; Sloan, J; Silviu-Dan, F; Peng, Z; Gagnon, D; Warrington, R

    1994-06-01

    A cross sectional survey was conducted in a hydroelectric power plant in which the workforce was exposed to large numbers of caddis flies. 28 of 57 employees participated. About 50% of the participants reported work related eye, nose, and sinus symptoms and wheezing. Working in locations with greater exposure to caddis flies was significantly associated with work related symptoms. 17 workers (61%) were skin prick positive to a laboratory prepared caddis fly antigen (LCFA) made from the remains of caddis flies present in the plant and 11 (39%) had positive reactions to a commercial caddis fly antigen (CCFA). Workers stationed in heavily exposed areas were 3.7 times as likely to have a positive response to the LCFA (p = 0.009) and 5.3 times as likely to have a positive response to the CCFA (p = 0.036). 13 (46%) of survey respondents reported three or more work related symptoms. 10 (91%) CCFA positive workers reported three or more work related symptoms. Pulmonary function studies revealed slight, but not significantly decreased forced vital capacity (FVC), forced expiratory volume in one second (FEV1), and FEV1/FVC ratios in workers who were skin test positive to either caddis fly preparation when compared with those who were negative. One worker who was skin test positive to both antigens had a cross shift fall in FEV1 of 20% predicted. Occupational allergy to caddis flies proved to be a significant health problem at this work site.

  4. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    SciTech Connect

    Crew, James F.; Johnson, Herbie N.

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  5. Legal obstacles and incentives to the development of small scale hydroelectric power in Connecticut

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric power in Connecticut are discussed. The Federal government also exercises extensive regulatory authority in the area and this dual system is examined from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. Connecticut follows the riparian theory of water law. Under this theory of the water law, private rights in rivers and streams are confined to the use of flowing water. A riparian proprietor does not own the water that flows by his estate. Licensing, permitting, and review procedures are discussed followed by discussion on public utilities regulation and indirect considerations.

  6. Legal obstacles and incentives to the development of small scale hydroelectric power in Ohio

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. A developer must obtain title or interest to a streambed from the proper riparian owners. Ohio provides assistance to an electric company in this undertaking by providing it with the power of eminent domain in the event it is unable to reach a purchase agreement with the riparian proprietors. The Ohio Water Law is discussed in detail, followed by discussions: Licensing, Permitting, and Review Procedures; Indirect Considerations; Ohio Public Utilities Commission; Ohio Department of Energy; Incidental Provision; and Financial Considerations.

  7. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    SciTech Connect

    Not Available

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  8. Development of a 1 D hydrodynamic habitat model for the Hippopotamus amphibious as basis for sustainable exploitation of hydroelectric power

    NASA Astrophysics Data System (ADS)

    Manful, D. Y.; Kaule, G.; Wieprecht, S.; Rees, J.; Hu, W.

    2009-12-01

    Hydroelectric Power (HEP) is proving to be a good alternative to carbon based energy. In the past hydropower especially large scale hydro attracted significant criticism as a result of its impact on the environment. A new breed of hydroelectric dam is in the offing. The aim is to have as little a footprint as possible on the environment in both pre and post construction phases and thus minimize impact on biodiversity whilst producing clean renewable energy. The Bui dam is 400 MW scheme currently under development on the Black Volta River in the Bui national park in Ghana. The reservoir created by the Bui barrage is expected to impact (through inundation) the habitat of two species of hippos know to exist in the park, the Hippopotamus amphibius and the Choeropsis liberiensis. Computer-based models present a unique opportunity to assess quantitatively the impact of the new reservoir on the habitat of the target species in this case the H. amphibious. Until this undertaking, there were very few studies documenting the habitat of the H. amphibious let alone model it. The work and subsequent presentation will show the development of a habitat model for the Hippopotamus amphibius. The Habitat Information retrieval Program based on Streamflow Analysis, in short HIPStrA, is a one dimensional (1D) in-stream, spatially explicit hybrid construct that combines physico-chemical evidence and expert knowledge to forecast river habitat suitability (Hs) for the Hippopotamus amphibius. The version of the model presented is specifically developed to assess the impact of a reservoir created by a hydroelectric dam on potential dwelling areas in the Bui gorge for hippos. Accordingly, this version of HIPStrA simulates a special reservoir suitability index (Rsi), a metric that captures the”hippo friendliness” of any lake or reservoir. The impact of measured and simulated flood events as well as low flows, representing extreme events is also assessed. Recommendations are made for the

  9. Self-sustaining land irrigating and hydroelectric power generating system

    SciTech Connect

    Keeling, W.W.

    1982-07-27

    A practical, economical and self-sustaining irrigation system for extensive arid regions utilizes a network of hydraulic ram fitted gravity-feed water tanks connected in series. Ram exhaust water is fed into irrigation pipes or ditches along the system. Ram elevated water in the tanks of the system is gravity fed from each tank to the next downstream ram. The first ram in the system is fed from a natural water source or dam. A complete system may include several natural or dammed water sources each feeding a downstream network of rams and tanks. Electrical power can also be generated in the system at least at the initial and secondary sources of water.

  10. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  11. Legal obstacles and incentives to the development of small scale hydroelectric power in New York

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step the small scale hydroelectric developer must take is that of acquiring title to the real property comprising the development site. The real estate parcel must include the requisite interest in the land adjacent to the watercourse, access to the underlying streambed and where needed, the land necessary for an upstream impoundment area. Land acquisition may be effectuated by purchase, lease, or grant by the state. In addition to these methods, New York permits the use of the eminent domain power of the state for public utilities under certain circumstances.

  12. National Hydroelectric Power Resources Study:Regional Assessment: Volume XXIII: Alaska and Hawaii

    DTIC Science & Technology

    1981-09-01

    insufficient data were available to make a complete computer analysis . A-3 COLUMN LINE FORM 2 NO. NO. ITEM NO. 65 COLUMN HEADING Summary Listing of...generic policy and technical issues associated with hydroelectric power development and operation. Volumes XII and XIII describe the procedures used to...OBERS Projections of Population, Income and Major Sector Earnings, (Alaska) •••••••••.••••••• Existing Transmission Lines - 33kV and Above

  13. Reaction of the dams behind the Toktoguol and Kurpsa hydroelectric power plants to repeated earthquakes

    SciTech Connect

    Marchuk, A.N.; Umralin, K.B.; Moldebehov, Z.I.

    1994-11-01

    The region where the chain of Naryn hydroelectric power plants are located in the Kyrgyzstan Republic is a seismically active area of Central Tien-Shan and is comparatively well known in seismological respects. No means of measuring the dams themselves, however, were ever incorporated as an instrumental base of investigation. The seismometric possibilities of embedded monitoring-measuring apparatus were disclosed by O.Yu. Schmidt Institute of Earth Physics and have made is possible to evaluate the reactions of dams to seismic effects and of excited seismicity, when residual deformations due to repeated tremors of different force and direction are accumulated over an extended period of time.

  14. Fish population genetic structure shaped by hydroelectric power plants in the upper Rhine catchment.

    PubMed

    Gouskov, Alexandre; Reyes, Marta; Wirthner-Bitterlin, Lisa; Vorburger, Christoph

    2016-02-01

    The Rhine catchment in Switzerland has been transformed by a chain of hydroelectric power stations. We addressed the impact of fragmentation on the genetic structure of fish populations by focusing on the European chub (Squalius cephalus). This fish species is not stocked and copes well with altered habitats, enabling an assessment of the effects of fragmentation per se. Using microsatellites, we genotyped 2133 chub from 47 sites within the catchment fragmented by 37 hydroelectric power stations, two weirs and the Rhine Falls. The shallow genetic population structure reflected drainage topology and was affected significantly by barriers to migration. The effect of power stations equipped with fishpasses on genetic differentiation was detectable, albeit weaker than that of man-made barriers without fishpasses. The Rhine Falls as the only long-standing natural obstacle (formed 14 000 to 17 000 years ago) also had a strong effect. Man-made barriers also exacerbated the upstream decrease in allelic diversity in the catchment, particularly when lacking fishpasses. Thus, existing fishpasses do have the desired effect of mitigating fragmentation, but barriers still reduce population connectivity in a fish that traverses fishpasses better than many other species. Less mobile species are likely to be affected more severely.

  15. Reliability improvements of the Guri Hydroelectric Power Plant computer control system AGC and AVC

    SciTech Connect

    Castro, F.; Pescina, M. ); Llort, G. )

    1992-09-01

    This paper describes the computer control system of a large hydroelectric powerplant and the reliability improvements made to the automatic generation control (AGC) and automatic voltage control (AVC) programs. hardware and software modifications were required to improve the interface between the powerplant and the regional load dispatch office. These modifications, and their impact on the AGC and AVC reliability, are also discussed. The changes that have been implemented are recommended for inclusion in new powerplant computer control systems, and as an upgrade feature for existing control systems.

  16. Noise model application to small hydroelectrical power plants impact evaluation in the Aosta Valley territory.

    PubMed

    Tibone, C; Agnesod, G; Cappio Borlino, M; Tartin, C; Crea, D; Berlier, F

    2009-12-01

    In this paper measurements, results and model estimates, with reference to hydroelectric power plant noise emissions in the Aosta Valley territory, are compared in different contexts. The analysis was performed to evaluate and point out the influence of the noise source context on the accuracy of the model results. The estimates were implemented considering power plants as: point sources and area sources taking (or not) into account the building elements of the plant. This method allowed evaluating the detail that is suitable to achieve in an estimate and to justify possible simplifications in this kind of noise source description. Noise measurements were carried out simultaneously, at different distances from the power plants that were taken into account. The measurement results at the closest points to the sources were used as the model input data, while the levels found at the other points were used for comparison with the estimate results.

  17. Influence of the Amazon Hydrological Regime on Eutrophication Indicators of a Hydroelectric Power Plant Reservoir.

    PubMed

    Freire, Jean Carlos A; Hauser-Davis, Rachel Ann; da Costa Lobato, Tarcísio; de Morais, Jefferson M; de Oliveira, Terezinha F; F Saraiva, Augusto Cesar

    2017-05-01

    Dam constructions in the Amazon have increased exponentially in the last decades, causing several environmental impacts and serious anthropogenic impacts in certain hydroelectric power plant reservoirs in the region have been identified. The assessment of the trophic status of these reservoirs is of interest to indicate man-made changes in the environment, but must take into account the hydrological cycle of the area. This can be relevant for environmental management actions, aiding in the identification of the ecological status of water bodies. In this context, physico-chemical parameters and eutrophication indicators were determined in a hydroelectric power plant reservoir in the Brazilian Amazon to assess trophic variations during the regional hydrological regime phases on the reservoir, namely dry, filling, full and emptying stages. The local hydrological regimes were shown to significantly influence TSS and turbidity, as well as NH4, NO3, PO4, with higher values consistently observed during the filling stage of the reservoir. In addition, differences among the sampling stations regarding land use, population and anthropogenic activities were reflected in the PO4(3-) values during the different hydrological phases.

  18. Efforts to Reduce the Impacts of Hydroelectric Power Production on Reservoir Fisheries in the United States.

    SciTech Connect

    Cada, G. F.

    1997-09-08

    Research into the environmental effects of hydroelectric power production in the United States has focused increasingly on resident and migratory fish populations. Hydropower dams and reservoirs can block fish movements in both upstream and downstream directions. These movements are essential for important stocks of anadromous and catadromous fish. In addition, some strictly freshwater fish may move long distances within a river during their life cycle.A dam can pose an impassable barrier for fish trying to move upstream unless mitigation measures in the form of ladders or lifts are provided. Fish moving downstream to the sea may become disoriented when they encounter static water within a reservoir. Both resident and migratory fish may be injured or killed by passing through the turbine or over the spillway. In the United States, a variety of organizations conduct applied research and development of measures to (1) enhance fish passage, (2) reduce the numbers of fish that are drawn into the turbine intakes, and (3) reduce the injury and mortality rates of fish that pass through the turbines. Examples of these efforts from a variety of river systems and hydroelectric power plants are described.

  19. Synanthropy of mosquitoes and sand flies near the Aimorés hydroelectric power plant, Brazil.

    PubMed

    Barata, R A; Ursine, R L; Nunes, F P; Morais, D H; Araújo, H S

    2012-12-01

    The environmental changes resulting from the construction of hydroelectric dams may affect the fauna of insect vectors and consequently the epidemiology of the diseases they transmit. This work examined the mosquito and sand fly fauna in the area of the Aimorés hydroelectric power plant, analyzing the seasonal distribution and the degree of species synanthropy in different ecotopes. Between November, 2008 and September, 2009, entomological captures were performed with the help of HP light traps in the rural, urban, and forest areas of Aimorés, Ituêta, Resplendor, and Baixo Guandu counties. The fauna proved to be quite diversified. Twenty-two species of mosquitoes and 11 species of sand flies were found. Culex quinquefasciatus was predominant among mosquitoes (76.7%), while Lutzomyia intermedia prevailed among sand flies (34.5%). Some of the captured species have medical interest. Supported by the high degree of synanthropy, those species reinforce the need for epidemiological surveillance. © 2012 The Society for Vector Ecology.

  20. Appropriate technology for planning hydroelectric power projects in Nepal: the need for assumption analysis

    SciTech Connect

    Chandler, C.G.

    1981-06-01

    The study focuses on the project development process for hydroelectric project planning in Nepal. Chapter I describes the contrast between the vast potential for hydroelectric power development in Nepal and the current energy shortage within the country, not only for electricity, but for firewood and other fuel sources as well. Chapter II explores some of the unknown factors facing hydropower project planners in Nepal, where data for hydrologic, geologic, environmental, and sociological project components are lacking. The chapter also examines institutional and fiscal factors which constrain the planning process. Chapter III describes the critical role of assumptions in the project development process, and details the stages that a project goes through as it is planned. The chapter introduces the concept of assumption analysis as a technique for project planning, listing the potential conflict between the assumptions of foreign consultants and the host-country users of project outputs as an ingredient in the project's success or failure. Chapter IV demonstrates the mechanics and usefulness of assumption analysis through an Assumption Analysis Chart, which shows the interaction among project objectives, project alternatives, project assumptions, and the project development process. Assumption analysis techniques are expected to be useful among bilateral and multilateral aid donors servicing less developed countries.

  1. An Investigation of Health and Safety Measures in a Hydroelectric Power Plant.

    PubMed

    Acakpovi, Amevi; Dzamikumah, Lucky

    2016-12-01

    Occupational risk management is known as a catalyst in generating superior returns for all stakeholders on a sustainable basis. A number of companies in Ghana implemented health and safety measures adopted from international companies to ensure the safety of their employees. However, there exist great threats to employees' safety in these companies. The purpose of this paper is to investigate the level of compliance of Occupational Health and Safety management systems and standards set by international and local legislation in power producing companies in Ghana. The methodology is conducted by administering questionnaires and in-depth interviews as measuring instruments. A random sampling technique was applied to 60 respondents; only 50 respondents returned their responses. The questionnaire was developed from a literature review and contained questions and items relevant to the initial research problem. A factor analysis was also carried out to investigate the influence of some variables on safety in general. Results showed that the significant factors that influence the safety of employees at the hydroelectric power plant stations are: lack of training and supervision, non-observance of safe work procedures, lack of management commitment, and lack of periodical check on machine operations. The study pointed out the safety loopholes and therefore helped improve the health and safety measures of employees in the selected company by providing effective recommendations. The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.

  2. Ticks (Acari: Ixodidae) on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil.

    PubMed

    Labruna, Marcelo B; de Paula, Cátia D; Lima, Thiago F; Sana, Dênis A

    2002-12-01

    From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paran river, between the states of S o Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species), Boophilus (1) and Anocentor (1). A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages) collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  3. [Space-time water monitoring system at the Iriklinsk hydroelectric power station].

    PubMed

    Deriabin, D G; Poliakov, E G; Priakhina, A A; Karimov, I F

    2002-01-01

    The Microbiosensor B 17677 F test system was applied to make a space-time monitoring of the biotoxicity of water used for production and everyday purposes at the Iriklinsk hydroelectric power station (IHEPS) and to identify the leading causes determining the biotoxicity of tested samples. There were seasonal variations in the biotoxicity with the maximum in spring and with minimum in winter and spring and a relationship of the spring rise in the biotoxicity to water pH changes. There was also an association of the certain values of the biotoxicity of industrial water with the concentration of petroleum products that are major pollutants at the IHEPS. The datum points that characterize the maximum level of technogenic exposure were identified.

  4. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Granby Dam Outlet, a Feature of the Colorado-Big Thompson (C-BT) Project, Colorado...

  5. 76 FR 22143 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Reclamation Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the Fryingpan-Arkansas Project...

  6. Design of an Adaptive Power Regulation Mechanism and a Nozzle for a Hydroelectric Power Plant Turbine Test Rig

    NASA Astrophysics Data System (ADS)

    Mert, Burak; Aytac, Zeynep; Tascioglu, Yigit; Celebioglu, Kutay; Aradag, Selin; ETU Hydro Research Center Team

    2014-11-01

    This study deals with the design of a power regulation mechanism for a Hydroelectric Power Plant (HEPP) model turbine test system which is designed to test Francis type hydroturbines up to 2 MW power with varying head and flow(discharge) values. Unlike the tailor made regulation mechanisms of full-sized, functional HEPPs; the design for the test system must be easily adapted to various turbines that are to be tested. In order to achieve this adaptability, a dynamic simulation model is constructed in MATLAB/Simulink SimMechanics. This model acquires geometric data and hydraulic loading data of the regulation system from Autodesk Inventor CAD models and Computational Fluid Dynamics (CFD) analysis respectively. The dynamic model is explained and case studies of two different HEPPs are performed for validation. CFD aided design of the turbine guide vanes, which is used as input for the dynamic model, is also presented. This research is financially supported by Turkish Ministry of Development.

  7. A Framework for Evaluation of CORDEX Using Dam Operation Policies for the East African Hydroelectric Power Industry

    NASA Astrophysics Data System (ADS)

    Smith, K. A.; Semazzi, F. H. M.

    2014-12-01

    The productivity of hydroelectric dams along the Nile River is to a large extent determined by the level of Lake Victoria, which is primarily dictated by the rainfall and temperature variability over the lake basin. The hydrological balance of Lake Victoria is comprised of tributary inflow (15% of the water balance), rainfall over the lake (85%), evaporation from the lake (80%), and outflow from the lake (20%). The Agreed Curve Policy has been used to manage the outflow from Lake Victoria. It guarantees the natural flow of water out of the lake as if there were no dams. However, declining lake levels and population growth have resulted in chronic load shedding for residential and industrial consumers in the region, leading to the need to develop a new release policy. The development of recently proposed water release policies for the hydroelectric dams at the outlet of Lake Victoria do not thoroughly account for projected climate change. We adopt a comprehensive approach using rainfall data from multiple CORDEX models to estimate lake levels and confidence levels for two different release policies. We then compare exceedence curves for the release rule policies based on observed rainfall data for recent decades. Exceedence curves indicate vulnerability to power supply reliability. Factors affecting precipitation in individual models are examined. There is a distinct dry-wet-dry-wet pattern of annual rainfall over the Lake Victoria basin, which is evident in a comparison of precipitation from rain gauge stations used in the water balance model. Previous studies have demonstrated that this feature is determined by a combination of orographic forcing, the thermodynamics of the lake, and the interaction between the prevailing wind flow and lake-land breeze circulation. ENSO has the most influence on precipitation over the lake basin in terms of annual climatology. We evaluate the CORDEX models based on how well they reproduce these metrics in addition to how well they

  8. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    SciTech Connect

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  9. Prediction of Francis Turbine Prototype Part Load Pressure and Output Power Fluctuations with Hydroelectric Model

    NASA Astrophysics Data System (ADS)

    Alligné, S.; Nicolet, C.; Béguin, A.; Landry, C.; Gomes, J.; Avellan, F.

    2017-04-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope from the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of ν = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed for all technologies to analyse potential interactions between hydraulic excitation sources and electrical components. Three technologies have been compared: the classical fixed speed configuration with Synchronous Machine (SM) and the two variable speed technologies which are Doubly Fed Induction Machine (DFIM) and Full Size Frequency Converter (FSFC).

  10. ''Rancho Hydro'': a low-head, high volume residential hydroelectric power system, Anahola, Kauai, Hawaii

    SciTech Connect

    Harder, J.D.

    1982-07-01

    The site is a 1.75 acre residential site with two households. The Anahola stream intersects the property line. Design of the proposed hydroelectric system is described, along with the permit process. Construction is in progress. (DLC)

  11. Small-Scale Hydroelectric Power Demonstration Project: reactivation of the Elk Rapids Hydroelectric Facility. Final technical and construction cost report

    SciTech Connect

    Not Available

    1985-05-01

    The Elk Rapids powerhouse dam is located on the Elk River channel in the Village of Elk Rapids, Michigan. Together with a small spillway structure located approximately 500 ft south of the dam, it constitutes the outlet to Lake Michigan for Elk Lake, Skegemog Lake, Torch Lake, Lake Bellaire, Clam Lake, and several smaller lakes. Power has been generated at the Elk Rapids site since the late nineteenth century, but the history of the present facility goes back to 1916 with the construction of the existing powerhouse dam by the Elk Rapids Iron Works Company. The facility was designed to contain four vertical-shaft generating units; however, only a single 270 hp Leffel type K unit was installed in 1916. In 1929, two additional Leffel units, rated 525 hp, were installed, and in 1930 a third 525 hp Leffel unit was added completely utilizing the capacity of the powerhouse and bringing the combined turbine capacity to 1845 hp.

  12. Small-scale hydroelectric power in the southeast: new impetus for an old energy source

    SciTech Connect

    Not Available

    1980-06-01

    The Southeastern conference, Small-Scale Hydroelectric Power: New Impetus for an Old Energy Source, was convened to provide a forum for state legislators and other interested persons to discuss the problems facing small-scale hydro developers, and to recommend appropriate solutions to resolve those problems. During the two-day meeting state legislators and their staffs, along with dam developers, utility and industry representatives, environmentalists and federal/state officials examined and discussed the problems impeding small-scale hydro development at the state level. Based upon the problem-oriented discussions, alternative policy options were recommended for consideration by the US Department of Energy, state legislatures and the staff of the National Conference of State Legislatures (NCSL). Emphasis was placed on the legal, institutional, environmental and economic barriers at the state level, as well as the federal delays associated with licensing small-scale hydro projects. Whereas other previously held conferences have emphasized the identification and technology of small-scale hydro as an alternative energy source, this conference stressed legislative resolution of the problems and delays in small-scale hydro licensing and development. Panel discussions and workshops are summarized. Papers on the environmental, economic, and legal aspects of small-scale hydropower development are presented. (LCL)

  13. Microbial diversity of an anoxic zone of a hydroelectric power station reservoir in Brazilian Amazonia.

    PubMed

    Graças, Diego A; Miranda, Paulo R; Baraúna, Rafael A; McCulloch, John A; Ghilardi, Rubens; Schneider, Maria Paula C; Silva, Artur

    2011-11-01

    Microbial diversity was evaluated in an anoxic zone of Tucuruí Hydroelectric Power Station reservoir in Brazilian Amazonia using a culture-independent approach by amplifying and sequencing fragments of the 16S rRNA gene using metagenomic DNA as a template. Samples obtained from the photic, aphotic (40 m) and sediment (60 m) layers were used to construct six 16S rDNA libraries containing a total of 1,152 clones. The sediment, aphotic and photic layers presented 64, 33 and 35 unique archaeal operational taxonomic units (OTUs). The estimated richness of these layers was evaluated to be 153, 106 and 79 archaeal OTUs, respectively, using the abundance-based coverage estimator (ACE) and 114, 83 and 77 OTUs using the Chao1 estimator. For bacterial sequences, 114, 69 and 57 OTUs were found in the sediment, aphotic and photic layers, which presented estimated richnesses of 1,414, 522 and 197 OTUs (ACE) and 1,059, 1,014 and 148 OTUs (Chao1), respectively. Phylogenetic analyses of the sequences obtained revealed a high richness of microorganisms which participate in the carbon cycle, namely, methanogenic archaea and methanotrophic proteobacteria. Most sequences obtained belong to non-culturable prokaryotes. The present study offers the first glimpse of the huge microbial diversity of an anoxic area of a man-made lacustrine environment in the tropics.

  14. The effects of run-of-river hydroelectric power schemes on invertebrate community composition in temperate streams and rivers.

    PubMed

    Bilotta, Gary S; Burnside, Niall G; Turley, Matthew D; Gray, Jeremy C; Orr, Harriet G

    2017-01-01

    Run-of-river (ROR) hydroelectric power (HEP) schemes are often presumed to be less ecologically damaging than large-scale storage HEP schemes. However, there is currently limited scientific evidence on their ecological impact. The aim of this article is to investigate the effects of ROR HEP schemes on communities of invertebrates in temperate streams and rivers, using a multi-site Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 22 systematically-selected ROR HEP schemes and 22 systematically-selected paired control sites. Five widely-used family-level invertebrate metrics (richness, evenness, LIFE, E-PSI, WHPT) were analysed using a linear mixed effects model. The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the evenness of the invertebrate community. However, no statistically significant effects were detected on the four other metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future invertebrate community impact studies.

  15. The effects of run-of-river hydroelectric power schemes on invertebrate community composition in temperate streams and rivers

    PubMed Central

    2017-01-01

    Run-of-river (ROR) hydroelectric power (HEP) schemes are often presumed to be less ecologically damaging than large-scale storage HEP schemes. However, there is currently limited scientific evidence on their ecological impact. The aim of this article is to investigate the effects of ROR HEP schemes on communities of invertebrates in temperate streams and rivers, using a multi-site Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 22 systematically-selected ROR HEP schemes and 22 systematically-selected paired control sites. Five widely-used family-level invertebrate metrics (richness, evenness, LIFE, E-PSI, WHPT) were analysed using a linear mixed effects model. The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the evenness of the invertebrate community. However, no statistically significant effects were detected on the four other metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future invertebrate community impact studies. PMID:28158282

  16. Determination of the Environmental Impacts of Hydroelectric Power Plants (HPP) in Black sea Region of Turkey Using Remotely Sensed Data

    NASA Astrophysics Data System (ADS)

    Seker, D. Z.; Kochan, N.; Denli, H. H.; Alganci, U.; kaya, S.; Sertel, E.

    2013-12-01

    Hydroelectric power plants have several environmental effects on their environment. The dam itself and its reservoir cause important changes in land cover at the related watershed. Mainly these changes occur as transform from forest and agricultural lands to bare lands and dam construction. It is important to monitor the land cover changes after the construction to understand the impacts of HPP on the ecology of basin. Remote sensing satellites serve as valuable tools for monitoring such changes with their capability of acquiring large areas multi-temporally. Classification of the pre and post satellite images can produce the land cover change information and its spatial distribution. Such kind of analysis will also help to determine the transformation between land cover types which is valuable information for interpreting the ecological impacts. Study focused on determination of the land cover changes in the different river watersheds of the Black Sea Region, Turkey, where a HPP construction was densely occurred. To investigate the changes around the HPP, High resolution satellite images belonging to 2009 and 2012 were used and analyzed with classification method in order to analyze the land cover changes and transformations between land cover types. Results were interpreted in terms of possible ecological impact aspects.

  17. Framework of systematic sustainability assessment strategy (FSSAS) for hydroelectric power industry in Malaysia

    NASA Astrophysics Data System (ADS)

    Johan, Kartina; Turan, Faiz Mohd

    2017-08-01

    Hydroelectric power is an alternative power resource in Malaysia and always associated with negative impact on environmental, social and economy of the surrounding site. The dispute over environmental, societal and economic issues can be minimised if compliance to sustainability development requirement is included in the project as part of the project premises during planning phase. This paper suggests a framework targeted for decision-makers in charge of implementing the projects to produce hydropower the sustainable way in Malaysian context which can mitigate the risks in social, environment and economy. The framework is strategic in nature and based on project management methodology with objective to provide a ‘common language’ by having a project value as measureable for stakeholders to state their mutual agreement of what a sustainable hydropower project in the context of Malaysia and in line with the United Nations (UN) 17 Sustainable Development Goals (SDGs). The paper discusses how the proposed systematic sustainability assessment strategy (FSSAS) framework support the call for Malaysia to promote meaningful public participation in ensuring land and natural resource decisions and to address citizens’ interests which is the core idea of Environmental Democracy Index established in 2014. The paper argues that, even though it is at present impossible to define precision status of sustainability development with respect to the nature of the multi stakeholders and the lack of systematic assessment the proposed FSSAS framework can be a valuable tool because it tracks the project value as a quantitative deliverable to determine the status of the journey in sustainable development towards accomplishing the SDG under a consensus in hydropower industry of any scale over time.

  18. Fish passage mitigation of impacts from hydroelectric power projects in the United States

    SciTech Connect

    Cada, G.F.

    1996-10-01

    Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy`s Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality.

  19. Legal obstacles and incentives to the development of small scale hydroelectric power in Pennsylvania

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Pennsylvania, there are 3 methods by which rights in water may be acquired: riparian ownership, prescription, and condemnation. These are discussed.

  20. The Effects of Run-of-River Hydroelectric Power Schemes on Fish Community Composition in Temperate Streams and Rivers

    PubMed Central

    2016-01-01

    The potential environmental impacts of large-scale storage hydroelectric power (HEP) schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR) schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon—Salmo salar, number of >1 year old Atlantic salmon, number of brown trout—Salmo trutta, and number of >1 year old brown trout). The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies. PMID:27191717

  1. The Effects of Run-of-River Hydroelectric Power Schemes on Fish Community Composition in Temperate Streams and Rivers.

    PubMed

    Bilotta, Gary S; Burnside, Niall G; Gray, Jeremy C; Orr, Harriet G

    2016-01-01

    The potential environmental impacts of large-scale storage hydroelectric power (HEP) schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR) schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon-Salmo salar, number of >1 year old Atlantic salmon, number of brown trout-Salmo trutta, and number of >1 year old brown trout). The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies.

  2. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: South Columbia Basin Irrigation District, Pasco, Washington

    SciTech Connect

    Schwartz, L.

    1980-05-01

    The case study concerns two modern human uses of the Columbia River - irrigation aimed at agricultural land reclamation and hydroelectric power. The Grand Coulee Dam has become synonomous with large-scale generation of hydroelectric power providing the Pacific Northwest with some of the least-expensive electricity in the United States. The Columbia Basin Project has created a half-million acres of farmland in Washington out of a spectacular and vast desert. The South Columbia River Basin Irrigation District is seeking to harness the energy present in the water which already runs through its canals, drains, and wasteways. The South District's development strategy is aimed toward reducing the costs its farmers pay for irrigation and raising the capital required to serve the remaining 550,000 acres originally planned as part of the Columbia Basin Project. The economic, institutional, and regulatory problems of harnessing the energy at site PEC 22.7, one of six sites proposed for development, are examined in this case study.

  3. New social movements and political process: The politics of hydroelectric power in Switzerland

    NASA Astrophysics Data System (ADS)

    Lehmann, Luzia M.

    This dissertation analyzes the mobilization and impact of the ecology movement mobilizing against and challenging hydroelectric power plants in the Alps. It argues that the political process model is the most fruitful framework for such a study, linking a political system's structural constraints and opportunities to movement action via organizational resources. The mobilization process resulting in movement impact is conceived as an interactive process among social movements, authorities, other opponents, and potential counter movements. The case study method is then used to analyze three action campaigns launched against hydro power plants in Graubunden since the 1970s: Ilanz I and II, Greina, and Curciusa. In terms of the movement's narrow goal of preventing a plant, Ilanz I and II is a failure, Greina a success, and Curciusa ambiguous. Yet the author defines movement impact more broadly, including procedural, reactive and proactive substantive impact, and structural impact, changes in the alliance/conflict system, and social learning. Based on the evidence from the case studies, these factors affect movement outcome positively: visibility in the media and framing the debate, adjusting the target level and movement repertoire to the opportunity structure and the spatial concentration of the issue, proactivity, and organizational resources with a well developed division of labor, internal communication, and a non-partisan alliance system at all levels. There are two main conceptual contributions. First, the author analyzes the political opportunity structure at all levels of the federal polity--the national, cantonal, and communal--as well as the interplay among the levels. The fact that the cantonal and communal levels exhibit more elements of closure than the national level helps explain differences in movements' organizational resources, movement repertoire, targeting of movement action, and thus movement impact. Second, the author develops the spatial

  4. [The social hygiene problems in the operator work of hydroelectric power station workers and the means for enhancing work capacity].

    PubMed

    Karakashian, A N; Lepeshkina, T R; Ratushnaia, A N; Glushchenko, S S; Zakharenko, M I; Lastovchenko, V B; Diordichuk, T I

    1993-01-01

    Weight, tension and harmfulness of professional activity, peculiarities of labour conditions and characteristics of work, shift dynamics of operative personnel's working capacity were studied in the course of 8-hour working day currently accepted at hydroelectric power stations (HEPS) and experimental 12-hour schedule. Working conditions classified as "admissible", positive dynamics of operators' state, their social and material contentment were a basis for 12-hour two-shift schedule to be recommended as more appropriate. At the same time, problem of optimal shift schedules for operative personnel of HEPS remains unsolved and needs to be further explored.

  5. Legal obstacles and incentives to the development of small scale hydroelectric power in Indiana

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy in Indiana are examined. The Federal government also exercises extensive regulatory authority in the area. An examination is made of the Federal-state relationships with the aim of creating a more orderly understanding of the vagaries of the system. The introductory chapter examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. The Indiana water law; direct and indirect regulations; the Public Service Commission of Indiana; and financial considerations are examined.

  6. Legal obstacles and incentives to the development of small-scale hydroelectric power in Rhode Island

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Rhode Island, any private rights in the flowing waters of a river or stream depend upon ownership of the abutting land. It appears Rhode Island follows the reasonable use theory of riparian law. The Department of Environmental Management is the most significant administrative agency with regard to dam construction, alteration, and operation in the state of Rhode Island.

  7. Flood Frequency Analysis Under Non-stationarity Conditions: the Case of Southern Brazilian Hydroelectric Power Plants

    NASA Astrophysics Data System (ADS)

    Bartiko, Daniel; Chaffe, Pedro; Bonumá, Nadia

    2017-04-01

    Floods may be strongly affected by climate, land-use, land-cover and water infrastructure changes. However, it is common to model this process as stationary. This approach has been questioned, especially when it involves estimate of the frequency and magnitude of extreme events for designing and maintaining hydraulic structures, as those responsible for flood control and dams safety. Brazil is the third largest producer of hydroelectricity in the world and many of the country's dams are located in the Southern Region. So, it seems appropriate to investigate the presence of non-stationarity in the affluence in these plants. In our study, we used historical flood data from the Brazilian National Grid Operator (ONS) to explore trends in annual maxima in river flow of the 38 main rivers flowing to Southern Brazilian reservoirs (records range from 43 to 84 years). In the analysis, we assumed a two-parameter log-normal distribution a linear regression model was applied in order to allow for the mean to vary with time. We computed recurrence reduction factors to characterize changes in the return period of an initially estimated 100 year-flood by a log-normal stationary model. To evaluate whether or not a particular site exhibits positive trend, we only considered data series with linear regression slope coefficients that exhibit significance levels (p<0,05). The significance level was calculated using the one-sided Student's test. The trend model residuals were analyzed using the Anderson-Darling normality test, the Durbin-Watson test for the independence and the Breusch-Pagan test for heteroscedasticity. Our results showed that 22 of the 38 data series analyzed have a significant positive trend. The trends were mainly in three large basins: Iguazu, Uruguay and Paranapanema, which suffered changes in land use and flow regularization in the last years. The calculated return period for the series that presented positive trend varied from 50 to 77 years for a 100 year

  8. Hydroelectric power generation in an Alpine basin: future water-energy scenarios in a run-of-the-river plant

    NASA Astrophysics Data System (ADS)

    Bongio, Marco; Avanzi, Francesco; De Michele, Carlo

    2016-08-01

    We investigate scenarios of hydroelectric power generation for an Alpine run-of-the-river plant in 2050. To this end, we include a conversion from streamflow to energy in a hydrological model of the basin, and we introduce a set of benchmark climate scenarios to evaluate expected future production. These are a "future-like-present" scenario assuming future precipitation and temperature inputs to be statistically equivalent to those observed during the recent past at the same location, a "warmer-future" scenario, which considers an additional increase in temperature, and a "liquid-only" scenario where only liquid precipitation is admitted. In addition, two IPCC-like climatic scenarios (RCP 4.5 and RCP 8.5) are considered. Uncertainty in glaciers' volume is accounted by initializing the hydrological model with two different inventories of glaciers. Ensemble results reveal that 1) an average decrease between -40% and -19% of hydroelectric power generation in 2050 is predicted at the plant considered (with respect to present condition); 2) an average decrease between -20% and -38% of cumulative incoming streamflow volume at the plant is also predicted, again with respect to present condition; 3) these effects are associated with a strong average decrease of the volume of glaciers (between -76% and -96%, depending on the initial value considered). However, Monte Carlo simulations show that results are also prone to high uncertainties. Implications of these results for run-of-the-river plants are discussed.

  9. Legal obstacles and incentives to the development of small scale hydroelectric power in Delaware

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Delaware, a watercourse is not to be confused with surface water. Each gives rise to certain riparian rights, but the law makes certain distinctions between the two. The presence of both surface waters and watercourses give rise to private and public rights related to the presence of the water. Some of these rights are vested in riparian owners. Recent Delaware case law has described the riparian owner as one who owns land on the bank of a river, or who is owner of land along, bordering upon, bounded by, fronting upon, abutting, or adjacent and contiguous to and in contact with a river. But, ownership of the bank does not give the riparian ownership of the water. Some law cases are cited to discuss the laws in Delaware.

  10. Legal obstacles and incentives to the development of small scale hydroelectric power in New Hampshire

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are described. The Federal government also exercises extensive regulatory authority in the area and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step any developer must take is that of acquiring the real estate parcel. The step involves acquisition in some manner of both river banks, the river bed, and where necessary the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important for only a use of water by a riparian owner is deemed a reasonable use and hence legal. Apart from acquisition by sale, lease, or gift, New Hampshire law permits a number of other methods. In part use of these methods will depend on whether the developer is the state, a municipality, a private corporation, or a public utility. Provided the developer avails himself of the five (5) megawatts exemption, his main regulatory agency will be the Water Resources Board. However, the state is not free from the problems of legal uncertainty inherent in determinations of reasonableness.

  11. Legal obstacles and incentives to the development of small-scale hydroelectric power in Virginia

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy in Virginia are described. The state regulatory system does not comprise final authority; the Federal government also exercises extensive regulatory authority in the area. This dual system is a function of the federalist nature of our government. The introductory section examines the dual system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and inquires into the practical use of the doctrine by the FERC. The use of a natural-surface watercourse in Virginia is governed generally by the doctrine of riparian rights. Riparian rights is a system of water rights based on ownership of land bordering on a natural stream or watercourse. For land to be considered riparian to a stream, that land must be located on the watershed of that portion of the stream. The theory of riparian rights followed in Virginia is one of reasonable use. Under the reasonable-use doctrine, each riparian owner has an equal right to the reasonable use of the water running naturally through or by his land for any useful purpose. The water must continue to run after such use without material diminution or alteration and without pollution.

  12. Legal obstacles and incentives to the development of small scale hydroelectric power in Maryland

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maryland are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined with the aim of creating a more orderly understanding of the vagaries of the system, focusing on the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. In Maryland, by common law rule, title to all navigable waters and to the soil below the high-water mark of those waters is vested in the state as successor to the Lord Proprietary who had received it by grant from the Crown. Rights to non-navigable water, public trust doctrine, and eminent domain are also discussed. Direct and indirect regulations, continuing obligations, loan programs, and regional organizations are described in additional sections.

  13. Future Impacts of Hydroelectric Power Development on Methylmercury Exposures of Canadian Indigenous Communities.

    PubMed

    Calder, Ryan S D; Schartup, Amina T; Li, Miling; Valberg, Amelia P; Balcom, Prentiss H; Sunderland, Elsie M

    2016-12-06

    Developing Canadian hydroelectric resources is a key component of North American plans for meeting future energy demands. Microbial production of the bioaccumulative neurotoxin methylmercury (MeHg) is stimulated in newly flooded soils by degradation of labile organic carbon and associated changes in geochemical conditions. We find all 22 Canadian hydroelectric facilities being considered for near-term development are located within 100 km of indigenous communities. For a facility in Labrador, Canada (Muskrat Falls) with planned completion in 2017, we probabilistically modeled peak MeHg enrichment relative to measured baseline conditions in the river to be impounded, downstream estuary, locally harvested fish, birds and seals, and three Inuit communities. Results show a projected 10-fold increase in riverine MeHg levels and a 2.6-fold increase in estuarine surface waters. MeHg concentrations in locally caught species increase 1.3 to 10-fold depending on time spent foraging in different environments. Mean Inuit MeHg exposure is forecasted to double following flooding and over half of the women of childbearing age and young children in the most northern community are projected to exceed the U.S. EPA's reference dose. Equal or greater aqueous MeHg concentrations relative to Muskrat Falls are forecasted for 11 sites across Canada, suggesting the need for mitigation measures prior to flooding.

  14. Assessment of power step performances of variable speed pump-turbine unit by means of hydro-electrical system simulation

    NASA Astrophysics Data System (ADS)

    Béguin, A.; Nicolet, C.; Hell, J.; Moreira, C.

    2017-04-01

    The paper explores the improvement in ancillary services that variable speed technologies can provide for the case of an existing pumped storage power plant of 2x210 MVA which conversion from fixed speed to variable speed is investigated with a focus on the power step performances of the units. First two motor-generator variable speed technologies are introduced, namely the Doubly Fed Induction Machine (DFIM) and the Full Scale Frequency Converter (FSFC). Then a detailed numerical simulation model of the investigated power plant used to simulate power steps response and comprising the waterways, the pump-turbine unit, the motor-generator, the grid connection and the control systems is presented. Hydroelectric system time domain simulations are performed in order to determine the shortest response time achievable, taking into account the constraints from the maximum penstock pressure and from the rotational speed limits. It is shown that the maximum instantaneous power step response up and down depends on the hydro-mechanical characteristics of the pump-turbine unit and of the motor-generator speed limits. As a results, for the investigated test case, the FSFC solution offer the best power step response performances.

  15. Legal obstacles and incentives to the development of small scale hydroelectric power in Vermont

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Vermont are discussed. The dual regulatory system involving state and Federal governments is discussed followed by discussions on property interests; direct regulation by the Public Service Board; indirect regulation; and financial considerations. An initial step required of any developer is that of real property acquisition. Ordinarily this involves acquiring the stream bed, land along the stream banks, and land needed for the impoundment reservoir. Ownership of land along the stream banks places the developer in the position of a riparian owner. This status is important in that only riparian owners are entitled to a reasonable use of the flowing water. In addition to acquisition by sale, lease, or gift, Vermont law allows certain developers to acquire property via eminent domain. Some general rules which have evolved as riparian law and applied in Vermont are discussed.

  16. Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power of the Boardman River at Traverse City, Michigan

    SciTech Connect

    None,

    1980-05-01

    An analytic description of one decision-making process concerning whether or not to develop the hydroelectric potential of the Boardman River is presented. The focus of the analysis is on the factor that the developers considered, or should consider in making a responsible commitment to small-scale hydroelectric development. Development of the Boardman River would occur at the five dam sites. Two existing dams, owned by the county, previously generated hydroelectricity, as did a third before being washed out. One dam has never been utilized. It is owned by the city which also owns the washed-out area. The study concludes that hydroelectric power is feasible at each. Grand Traverse County and Traverse City would engage in a joint venture in developing the resource. Chapter I presents a detailed description of the developers, the river resource, and the contemplated development. Chapter II is an analysis of the factors affecting the decision making process. Chapter III summarizes the impact of the more significant barriers and incentives and presents recommendations that, if implemented, will favorably affect decisions to develop small-scale hydroelectric generation capability.

  17. [Experience in organization of joint actions of expert divisions during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station].

    PubMed

    Kolkutin, V V; Ivanov, P L; Fetisov, V A; Afanas'ev, S A; Dorozhkin, O A; Vognerubov, R N; Kuznetsov, T L

    2010-01-01

    The authors illustrate positive experience in organization and coordination of joint actions of expert divisions of different sectors during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station in August 2009. Special emphasis is laid on the participation of experts of quick-reaction teams formed by territorial forensic medical bureaus, mobile and supporting forces from the adjacent regions.

  18. Active tectonics and Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (NW Himalaya, India)

    NASA Astrophysics Data System (ADS)

    Draganits, Erich; Grasemann, Bernhard; Gier, Susanne; Hofmann, Christa-Charlotte; Janda, Christoph; Bookhagen, Bodo; Preh, Alexander

    2015-04-01

    The Baspa River is one of the most important tributaries to the Sutlej River in the NW Himalaya (India). Its catchment is 1116 km2 in size, ranges from c. 6400 m asl to 1770 m asl and contains India's largest private hydroelectric facility, the 300 MW Baspa II. Geologically, the hydroelectric installation is located in the Higher Himalayan Crystalline, just above the active Karcham Normal Fault, which is reactivating the Early Miocene Main Central Thrust, one of the principal Himalayan faults. The area is seismically active and mass-movements are common. Around 8200 yrs BP the Baspa was dammed by a rock-avalanche dam, leading to the formation of the originally c. 260 m deep palaeo-lake Sangla palaeo-lake. Detailed sedimentological investigations and radiocarbon dating indicate that the palaeo-lake was completely filled with sediments until c. 5100 yrs BP. This makes the Sangla palaeo-lake to a very rare example of a mass-movement dam with very long duration and its lacustrine sediments represent a valuable archive for geological processes and environmental proxies within the Baspa catchment during the c. 3100 years of its existence - which are the aim of our study. At least 5 levels of soft-sediment deformation have been recorded in the exposed part of the lacustrine sediments of Sangla palaeo-lake, including brecciated laminae, overturned laminae, folds, faults and deformation bands, separated by undeformed deposits. They are interpreted as seismites, indicating at least 5 earthquakes within 2500 years strong enough to cause liquefaction. The 300 MW Baspa II hydro-electric power plant has been built exactly on top of this palaeo-lake. This special location represents a very rare possibility to evaluate the short-term, river load and hydrological parameters measured during the planning and operational stages of Baspa II with the long-term parameters gained from the palaeo-lake sediments from the catchment. This data show that the Mid-Holocene erosion rates of the

  19. HANDMADE WOODEN RACK FOR TOOL STORE, LOWER LEVEL OF HYDROELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    HANDMADE WOODEN RACK FOR TOOL STORE, LOWER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  20. HARNESS END OF ELECTRIC TURBINE IN LOWER LEVEL OF HYDROELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    HARNESS END OF ELECTRIC TURBINE IN LOWER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  1. The Impacts of Wind Speed Trends and Long-term Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific Northwest

    NASA Astrophysics Data System (ADS)

    Cross, B.; Kohfeld, K. E.; Cooper, A.; Bailey, H. J.; Rucker, M.

    2013-12-01

    The use of wind power is growing rapidly in the Pacific Northwest (PNW ) due to environmental concerns, decreasing costs of implementation, strong wind speeds, and a desire to diversify electricity sources to minimize the impacts of streamflow variability on electricity prices and system flexibility. In hydroelectric dominated systems, like the PNW, the benefits of wind power can be maximized by accounting for the relationship between long term variability in wind speeds and reservoir inflows. Clean energy policies in British Columbia make the benefits of increased wind power generation during low streamflow periods particularly large, by preventing the overbuilding of marginal hydroelectric projects. The goal of this work was to quantify long-term relationships between wind speed and streamflow behavior in British Columbia. Wind speed data from the North American Regional Reanalysis (NARR) and cumulative usable inflows (CUI) from BC Hydro were used to analyze 10m wind speed and density (WD) trends, WD-CUI correlations, and WD anomalies during low and high inflow periods in the PNW (40°N to 65°N, 110°W to 135°W) from 1979-2010. Statistically significant positive wind speed and density trends were found for most of the PNW, with the largest increases along the Pacific Coast. CUI-WD correlations were weakly positive for most regions, with the highest values along the US coast (r ~0.55), generally weaker correlations to the north, and negative correlations (r ~ -0.25) along BC's North Coast. When considering seasonal relationships, the Spring freshet was coincident with lower WD anomalies west of the Rocky Mountains and higher WDs to the east. A similar but opposite pattern was observed for low inflow winter months. When considering interannual variability, lowest inflow years experienced positive WD anomalies (up to 40% increases) for the North Coast. In highest inflow years, positive WD anomalies were widespread in the US and for smaller patches of central BC

  2. The impact of a hydroelectric power plant on the sediment load in downstream water bodies, Svartisen, northern Norway.

    PubMed

    Bogen, J; Bønsnes, T E

    2001-02-05

    When the Svartisen hydroelectric power plant was put into operation, extensive sediment pollution was observed in the downstream fjord area. This paper discusses the impact of the power plant and the contribution from various sources of sediment. Computation of the sediment load was based on samples collected one to four times per day. Grain size distribution analyses of suspended sediments were carried out and used as input in a routing model to study the movement of sediments through the system. Suspended sediment delivered to the fjord before the power station was constructed was measured as 8360 metric tons as an annual mean for a 12-year period. During the years 1995-1996 when the power plant was operating, the total suspended load through the power station was measured as 32609 and 30254 metric tons, respectively. Grain size distribution analyses indicate a major change in the composition of the sediments from 9% clay before the power plant was operative to 50-60% clay afterwards. This change, together with the increase in sediment load, is believed to be one of the main causes of the drastic reduction in secchi depths in the fjord. The effect of the suspended sediment load on the fjord water turbidity was evaluated by co-plotting secchi depth and power station water discharge. Measurements during 1995 and 1996 showed that at the innermost of these locations the water failed to attain the minimum requirement of 2 m secchi depth. In later years secchi depths were above the specified level. In 1997 and 1998 the conditions improved. At the more distal locality, the conditions were acceptable with only a few exceptions. A routing model was applied to data acquired at a location 2 km from the power station in order to calculate the contributions from various sediment sources. This model indicated that the contribution from reservoir bed erosion dominated in 1994 but decreased significantly in 1995. Future operation of the power station will mostly take place with

  3. An evaluation pattern for antimacrofouling procedures: Limnoperna fortunei larvae study in a hydroelectric power plant in South America.

    PubMed

    Darrigran, Gustavo; Damborenea, Cristina; Greco, Nancy

    2007-11-01

    The effects of global change and globalization of trade on the biosphere spur an increase in bioinvasions and their subsequent impact on ecosystems. Continental invading bivalves are important because of their impact on artificially-constructed structures. Limnoperna fortunei was first found in the Neotropical region in 1991. Since then it has dispersed upstream in the Plata and Guaíba basins at a rate of 240 km y(-1). This species causes macrofouling in a manner similar to that caused by Dreissena polymorpha. This paper describes the biology of L. fortunei larvae from a hydroelectric power plant in South America. We suggest the importance of knowing the biology of the invading species and the need to consider the settlement patterns and densities of larvae in each of the sectors of the facility in order to achieve a sustainable prevention/control of macrofouling. This study acquires a global significance under the assumption that L. fortunei will eventually invade North America and Europe.

  4. Evaluation of melioration area damage on the river Danube caused by the hydroelectric power plant 'Djerdap 1' backwater.

    PubMed

    Pajic, P; Andjelic, L; Urosevic, U; Polomcic, D

    2014-01-01

    Construction of the hydroelectric power plant (HPP) 'Djerdap 1' formed a backwater effect on the Danube and its tributaries, which had an inevitable influence on groundwater level, causing it to rise and thus creating additional threats to all melioration areas on more than 300 km of the Danube riversides, as well as on the riversides of its tributaries: the Sava (100 km) and the Tisa (60 km). In this paper, the HPP 'Djerdap 1' backwater effect on some characteristic melioration areas (34 in all) has been analyzed. In most of these areas intensive agricultural activity has always been present. An assessment of agricultural production damage was carried out by complex hydrodynamic calculations (60 calculation profiles) for different backwater regimes, with the aim to precisely quantify the HPP 'Djerdap 1' backwater effect on groundwater piezometric levels. Combining them with complex agroeconomic analyses, the aim is to quantify agricultural production damage and to consider the perspective of melioration area users. This method, which combines two different, but compatible, aspects of the melioration area threat assessment (hydrodynamic and agroeconomic), may present a quality base for further agricultural production threat assessment on all melioration areas on the Danube riversides, with the final aim to consider the economic effects and the importance of its further protection.

  5. New data on species of Demidospermus (Dactylogyridae: Monogenea) parasitizing fishes from the reservoir of the Itaipu Hydroelectric Power Station, Paraná State, Brazil, with new synonymies.

    PubMed

    Cohen, Simone C; Kohn, Anna

    2008-01-01

    Eight known species of Demidospermus (Dactylogyridae, Monogenea) were collected from siluriform fishes from reservoir of the Itaipu Hydroelectric Power Station, Paraná, Brazil. Four of them are recorded for the first time in Brazil, enlarging their geographical distribution: Demidospermus armostus, Demidospermus anus, Demidospermus bidiverticulatum and Demidospermus valenciennesi. Demidospermus labrosi is synonymized with Demidospermus cornicinus and Demidospermus mandi with Demidospermus leptosynophallus and reported from two new hosts. Demidospermus paravalenciennesi and Demidospermus uncusvalidus were also collected.

  6. Hydrodynamic optimization of trust ring pump and lubricating oil system for large hydroelectric units thrust bearing

    NASA Astrophysics Data System (ADS)

    Lai, X.; Lu, Z.; Zhang, X.; Yang, S.

    2014-03-01

    Thrust-ring-pump is a kind of extreme-low specific speed centrifugal pump with special structure as numerous restrictions form thrust bearing and operation conditions of hydro turbine generator unit. Because the oil circulating and cooling system with thrust-ring- pump has a lot of advantages in maintenance and compactness in structure, it has widely been used in large and medium-sized hydro-generator units. Since the diameter and the speed of the thrust ring is limited by the generator set, the matching relationship between the flow passage inside the thrust ring (equivalent to impeller) and oil bath (equivalent to volute) has great influence on hydrodynamic performance of thrust-ring-pump, additionally, the head and discharge are varying with the operation conditions of hydro-generator unit and characteristic of the oil circulating and cooling system. As so far, the empirical calculation method is employed during the actual engineering design, in order to guarantee the operating performance of the oil circulating and cooling system with thrust-ring-pump at different conditions, a collaborative hydrodynamic design and optimization of both the oil circulating and cooling system and thrust-ring-pump is purposed in this paper. Firstly, the head and discharge required at different conditions are decided by 1D flow numerical simulation of the oil circulating and cooling system. Secondly, the flow passages of thrust-ring-pump are empirically designed under the restrictions of diameter and the speed of the thrust ring according to the head and discharge from the simulation. Thirdly, the flow passage geometry matching optimization between holes inside the thrust ring and oil bath is implemented by means of 3D flow simulation and performance prediction. Then, the pumps and the oil circulating and cooling system are collaborative hydrodynamic optimized with predicted head- discharge curve and the efficiency-discharge curve of thrust-ring-pump. The presented methodology has

  7. The First Israeli Hydro-Electric Pumped Storage Power Plant Gilboa PSPP

    NASA Astrophysics Data System (ADS)

    Maruzewski, P., Dr.; Sautereau, T.; Sapir, Y.; Barak, H.; Hénard, F.; Blaix, J.-C.

    2016-11-01

    The Israeli Public Utilities Authority, PUA, decided to increase the instantaneous power available on the grid by adding Pumped Storage Power Plants, PSPP, to the existing generation capacity. PSP Investments Ltd. is a private investor that decided to develop the Gilboa PSPP. Its capacity is 300MWe. The project performance has to comply with PUA regulation for PSPP, and with all relevant Israeli laws and IECo standards. This paper itemizes an overview of the Gilboa PSPP through short summaries of units’ components from design step to manufacturing processes.

  8. Structure dynamics of a fish community over ten years of formation in the reservoir of the hydroelectric power plant in upper Uruguay River.

    PubMed

    Schork, G; Zaniboni-Filho, E

    2017-11-01

    The objective of this study was to evaluate the structure of the fish assemblage in the ten years following the closing of the lake of the Itá Hydroelectric Power Plant. Seasonal collections were conducted from 2001 to 2010. During this period, 44,834 fish were captured, totaling 3,818.01 kg, among 8 orders, 24 families and 84 species. In general, profound changes were not observed in the fish assemblage in the ten years after the formation of the Itá lake. Few species changed in dominance over time, while many were rare in the environment. The ichthyofauna in the reservoir was dominated by small and medium size opportunist species that conduct short or no migratory movements. Among the most abundant, six species were responsible for more than 50% of the numeric representation: Steindachnerina brevipinna, Astyanax fasciatus, Apareiodon affinis, Hypostomus isbrueckeri, Iheringichthys labrosus and Loricariichthys anus. The increase in the representation of the later species stood out. The biomass was dominated by Steindachneridion scriptum, Prochilodus lineatus, I. laborsus, Schizodon nasutus, Hoplias malabaricus, Acestrorhynchus pantaneiro, Hoplias lacerdae, H. isbrueckeri and L. anus. Despite the presence of large migrators in the region of the reservoir, their vulnerability was revealed by the low numeric abundance and accidental capture. The k-dominance curve of numerical abundance and biomass indicates a moderately disturbed community, in which the representation of small species was also important to the amounts of biomass.

  9. [The assessment of the general functional status and of the psychosomatic complaints of workers at hydroelectric power plants].

    PubMed

    Danev, S; Dapov, E; Pavlov, E; Nikolova, R

    1992-01-01

    Evaluation of the general functional status and psychosomatic complaints of 61 workers from the hydroelectric power stations is made. The following methods are used: 1. Assessment of the general functional state, by means of computer analysis of the cardiac variability, analysing the changes in the values of the following indices: average value of the cardiac intervals (X), their standard deviation (SD), coefficient of variation (CV), amplitude of the mode (AMO), index of stress (IS), index of the vegetative balance (IVB), homeostatic index (HI). The last 3 indices serve for determination of the complex evaluation of chronic fatigue and work adaptation (ChFWA). 2. Evaluation of the psychosomatic complaints, by the use of a questionnaire for the subjective psychosomatic complaints. 3. Studying the systolic and diastolic blood pressure. The average values received in workers from HPS were compared with the average values of the population of the country and with the average values of a similar working activity of a group of operators from the thermal power station HPS. In conclusion it could be noted that concerning ChFWA the received values in workers from HPS are not more unfavourable generalized values from that measured in workers, occupied with similar type of work in other industrial branches of the country. However, they are with more unfavourable data in comparison with the workers from HPS. The subjective evaluation of the operators concerning their psychic and body health status is moderately worse, both in comparison with the values of the index for the country, and in comparison with those of the operators from HPS.

  10. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Energy Regulatory Commission Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On April 4, 2013, Lakeport Hydroelectric Associates and Lakeport Hydroelectric...

  11. Advanced pumped storage hydroelectric power may reduce NO{sub x} and VOC emissions

    SciTech Connect

    1995-05-01

    As a severe ozone nonattainment area, the New York/New Jersey metropolitan area faces the difficult challange of reducing emissions of nitrogen oxides (NO{sub x}) and volatile organic compounds (VOCs), the primary precursors of ground-level ozone. An ambitious, $2.4 billion undertaking, known as the Mt. Hope project, may help the metropolitan area - and the entire Mid-Atlantic Ozone Transport Region (OTR) - attain ozone compliance. The project includes a new 2,000-MW electricity storage facility, which would allow thermal power plants in the region to run more efficiently and reduce NO{sub x} and VOC emissions, especially at times of critical ozone levels. The Mt. Hope project is the subject of a recent study that analyzed, potential reductions in ozone precursors from project implementation. According to the study, NO{sub x} emissions could be reduced by up to 50 tons per day and $91 million per year could potentially be saved if the project is implemented. Advanced pumped storage (APS) improves significantly on the conventional method. The Mt. Hope project, for example, is expected to consume only 22% more electricity than it generates. APS facilities are designed to switch from power-receiving to power-generating modes frequently in response to demand - up to 20 times a day in the Mt. Hope design. 1 ref., 1 fig.

  12. Low-head hydroelectric power demonstration project: City of Gonzales, Texas

    NASA Astrophysics Data System (ADS)

    1985-01-01

    This report summarizes the project construction which began in the second quarter of 1980 with the dismantling of the existing turbines, and was completed in the last quarter of 1983. The existing power plant structure and dam are located at Gonzales, Texas on the Guadalupe River. The powerhouse was built in 1925. The ungated dam produces a net head of about 14 feet. The power plant consists of three bays that originally housed three vertical open flume units. Power was transmitted from each turbine runner by a vertical shaft to a generator located some 20 feet above the crest of the dam and above normal river flood levels. The plant went into operation soon after 1925. Each unit had a nominal output of about 370 kW. In 1965, the generator, governors, and electrical equipment were removed from the powerhouse. The turbines were left in place. The dam and powerhouse were in fairly good condition, requiring only minimal restoration. However, bank protection on the left abutment and erosion control improvements on the right abutment were necessary. Disassembly and inspection of the old turbines showed them to be in good condition, and the decision was made to rehabilitate them. .DLN : Killed, Superseded by N85-35233

  13. Novel Repair Technique for Life-Extension of Hydraulic Turbine Components in Hydroelectric Power Stations

    NASA Astrophysics Data System (ADS)

    Hiramatsu, Yoichi; Ishii, Jun; Funato, Kazuhiro

    A significant number of hydraulic turbines operated in Japan were installed in the first half of the 20th century. Today, aging degradation and flaws are observed in these turbine equipments. So far, Japanese engineers have applied NDI technology of Ultrasonic Testing (UT) to detect the flaws, and after empirical evaluation of the remaining life they decided an adequate moment to replace the equipments. Since the replacement requires a large-scale field site works and high-cost, one of the solutions for life-extension of the equipments is introduction of repair services. We have been working in order to enhance the accuracy of results during the detection of flaws and flaws dimensioning, in particular focusing on the techniques of Tip-echo, TOFD and Phased-Array UT, accompanied by the conventional UT. These NDI methods made possible to recognize the entire image of surface and embedded flaws with complicated geometry. Then, we have developed an evaluation system of these flaws based on the theory of crack propagation, of the logic of crack growth driven by the stress-intensity factor of the crack tip front. The sophisticated evaluation system is constituted by a hand-made software and database of stress-intensity factor. Based on these elemental technologies, we propose a technique of repair welding to provide a life-extension of hydraulic turbine components.

  14. Erosion Control and Recultivation Measures at a Headrace Channel of a Hydroelectric Power Plant using Different Combined Soil Bioengineering Techniques

    NASA Astrophysics Data System (ADS)

    Obriejetan, M.; Florineth, F.; Rauch, H. P.

    2012-04-01

    vegetation properties are studied by setting up comparative test plots at a field study site located at a headrace channel of a hydroelectric power plant. Different vegetational parameters such as basal coverage, species richness, species composition, abundance/dominance values by using a refined Braun-Blanquet cover estimation scale were collected as well as local environmental properties. Results during the first vegetation period show distinct effects of geotextiles especially on overall vegetation coverage and grasses-herbs-ratio. Geotextile supported plots show 20% higher overall coverage but lower amount of herbs after three months of vegetation growth compared to control plots without installation of auxiliary materials. Furthermore coir blankets reveal higher penetration resistance for seed leaves of herbal plants compared to coir nettings. Hence technical erosion protection products, biological components and it's combination have to be closely coordinated in order to achieve specified revegetation objectives and meet long-term functionality.

  15. Spatial and temporal abundance of three sylvatic yellow fever vectors in the influence area of the Manso hydroelectric power plant, Mato Grosso, Brazil.

    PubMed

    Ribeiro, A L M; Miyazaki, R D; Silva, M; Zeilhofer, P

    2012-01-01

    Human biting catches of sylvatic yellow fever (SYF) vectors were conducted at eight stations in the influence area of the Manso hydroelectric power plant (Central Brazil) in sampling campaigns every 2 mo from July 2000 to November 2001. In total, 206 individuals were captured and classified as one of three species important for the transmission of SYF in Mato Grosso state: Haemagogus (Haemagogus) janthinomys (Dyar, 1921); Haemagogus (Conopostegus) leucocelaenus (Dyar & Shannon, 1924); and Sabethes (Sabethoides) chloropterus (Humboldt, 1819). The highest vector abundance was observed during the rainy season (November through March) and SYF vectors were present in all sampling points throughout the year, mainly in riparian and shadowed transitional forests at shadowed ramps.

  16. Natural infection by Paramphistomoidea Stiles and Goldberger, 1910 trematodes in wild Marsh Deer (Blastocerus dichotomus Illiger, 1815) from Sérgio Mottas's hydroelectric power station flooding area.

    PubMed

    do Nascimento, Cristiano G; do Nascimento, Adjair A; Mapeli, Elaine B; Tebaldi, José H; Duarte, José M B; Hoppe, Estevam G Lux

    2006-01-01

    Studies on helminthfauna of marsh deer Blastocerus dichotomus Illiger, 1815 are rare, although helminthic diseases are an important cause of mortality in these animals. Fifteen male and female adult marsh deer from Sergio Motta's hydroelectric power station flooding area at Paraná River which died during the capture and quarantine procedures, between 1998 and 1999, were necropsied. Three trematodes species, Paramphistomum cervi, Balanorchis anastrofus and Zygocotyle lunatum, all belonging to superfamily Paramphistomoidea, were identified. The obtained trematodes were identified, counted and their respectives descriptors of infection were determined. All necropsied animals were infected by helminths. Paramphistomum cervi was the most prevalent species, while Zygocotyle lunatum was found in only one animal.

  17. The Impacts of Wind Speed Trends and 30-Year Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific Northwest.

    PubMed

    Cross, Benjamin D; Kohfeld, Karen E; Bailey, Joseph; Cooper, Andrew B

    2015-01-01

    In hydroelectric dominated systems, the value and benefits of energy are higher during extended dry periods and lower during extended or extreme wet periods. By accounting for regional and temporal differences in the relationship between wind speed and reservoir inflow behavior during wind farm site selection, the benefits of energy diversification can be maximized. The goal of this work was to help maximize the value of wind power by quantifying the long-term (30-year) relationships between wind speed and streamflow behavior, using British Columbia (BC) and the Pacific Northwest (PNW) as a case study. Clean energy and self-sufficiency policies in British BC make the benefits of increased generation during low streamflow periods particularly large. Wind density (WD) estimates from a height of 10m (North American Regional Reanalysis, NARR) were correlated with cumulative usable inflows (CUI) for BC (collected from BC Hydro) for 1979-2010. The strongest WD-CUI correlations were found along the US coast (r ~0.55), whereas generally weaker correlations were found in northern regions, with negative correlations (r ~ -0.25) along BC's North Coast. Furthermore, during the lowest inflow years, WD anomalies increased by up to 40% above average values for the North Coast. Seasonally, high flows during the spring freshet were coincident with widespread negative WD anomalies, with a similar but opposite pattern for low inflow winter months. These poorly or negatively correlated sites could have a moderating influence on climate related variability in provincial electricity supply, by producing greater than average generation in low inflow years and reduced generation in wet years. Wind speed and WD trends were also analyzed for all NARR grid locations, which showed statistically significant positive trends for most of the PNW and the largest increases along the Pacific Coast.

  18. The Impacts of Wind Speed Trends and 30-Year Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific Northwest

    PubMed Central

    Cross, Benjamin D.; Kohfeld, Karen E.; Bailey, Joseph; Cooper, Andrew B.

    2015-01-01

    In hydroelectric dominated systems, the value and benefits of energy are higher during extended dry periods and lower during extended or extreme wet periods. By accounting for regional and temporal differences in the relationship between wind speed and reservoir inflow behavior during wind farm site selection, the benefits of energy diversification can be maximized. The goal of this work was to help maximize the value of wind power by quantifying the long-term (30-year) relationships between wind speed and streamflow behavior, using British Columbia (BC) and the Pacific Northwest (PNW) as a case study. Clean energy and self-sufficiency policies in British BC make the benefits of increased generation during low streamflow periods particularly large. Wind density (WD) estimates from a height of 10m (North American Regional Reanalysis, NARR) were correlated with cumulative usable inflows (CUI) for BC (collected from BC Hydro) for 1979–2010. The strongest WD-CUI correlations were found along the US coast (r ~0.55), whereas generally weaker correlations were found in northern regions, with negative correlations (r ~ -0.25) along BC’s North Coast. Furthermore, during the lowest inflow years, WD anomalies increased by up to 40% above average values for the North Coast. Seasonally, high flows during the spring freshet were coincident with widespread negative WD anomalies, with a similar but opposite pattern for low inflow winter months. These poorly or negatively correlated sites could have a moderating influence on climate related variability in provincial electricity supply, by producing greater than average generation in low inflow years and reduced generation in wet years. Wind speed and WD trends were also analyzed for all NARR grid locations, which showed statistically significant positive trends for most of the PNW and the largest increases along the Pacific Coast. PMID:26271035

  19. [Analysis of the social and health impacts of large hydroelectric plants: lessons for a sustainable energy management].

    PubMed

    de Queiroz, Adriana Renata Sathler; Motta-Veiga, Marcelo

    2012-06-01

    The main objective of this study was to analyze the social and health impacts resulting from the construction of the Tucuruí (Pará, Brazil) and James Bay (Quebec, Canada) Hydroelectric Plants. The comparative method study used in analysis of the literature review revealed lessons to be learned from the national and international experience in order to ensure sustainable management of future major energy projects in Brazil. In this study, a successive negative domino effect was observed in terms of social impacts on jobs, income, sanitation, and culture, all with associated health problems. These included stress, nutritional and psychosocial disturbances, cardiopathies, as well as respiratory and digestive problems. The actions seeking to mitigate the effects of these negative impacts were slow to be implemented. Moreover, even though three decades have elapsed, these actions proved inefficient to resolve all the health and socio-environmental problems caused.

  20. Analysis of large power systems

    NASA Technical Reports Server (NTRS)

    Dommel, H. W.

    1975-01-01

    Computer-oriented power systems analysis procedures in the electric utilities are surveyed. The growth of electric power systems is discussed along with the solution of sparse network equations, power flow, and stability studies.

  1. Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power at the Maxwell locks and dam, Pennsylvania

    SciTech Connect

    None,

    1980-05-01

    The legal, institutional and financial obstacles, and incentives to the development of hydroelectric power at the Maxwell locks and dam on the Monongahela River are analyzed. The study is one of five studies prepared by the Energy Law Institute pursuant to a contract with the National Conference of State Legislators. Each of the five studies views dam development by a different category of developer. These categories include a municipality, a public utility, a state, a private developer, and a cooperative. The Maxwell case study concerns potential development by Allegheny Electric Cooperative. Thus, the analysis of obstacles and incentives is focused on those factors which have particular impact on a cooperative. Subjects covered include a description of the site; developer description; the feasibility study; the economic feasibility; financing; Federal licensing by FERC; state licensing; local interest and requirements; the effect of locks and dam operation by the Army Corp of Engineers; and power marketing.

  2. The impacts of wind power integration on sub-daily variation in river flows downstream of hydroelectric dams.

    PubMed

    Kern, Jordan D; Patino-Echeverri, Dalia; Characklis, Gregory W

    2014-08-19

    Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. However, more coordinated use of wind and hydropower resources may exacerbate the impacts dams have on downstream environmental flows, that is, the timing and magnitude of water flows needed to sustain river ecosystems. In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). Results show that the greatest potential for wind energy to impact downstream flows occurs at high (∼25%) wind market penetration, when the dam sells more reserves in order to exploit spikes in real-time electricity prices caused by negative wind forecast errors. Nonetheless, compared to the initial impacts of dam construction (and the dam's subsequent operation as a peaking resource under baseline conditions) the marginal effects of any increased wind market penetration on downstream flows are found to be relatively minor.

  3. Power quality load management for large spacecraft electrical power systems

    NASA Technical Reports Server (NTRS)

    Lollar, Louis F.

    1988-01-01

    In December, 1986, a Center Director's Discretionary Fund (CDDF) proposal was granted to study power system control techniques in large space electrical power systems. Presented are the accomplishments in the area of power system control by power quality load management. In addition, information concerning the distortion problems in a 20 kHz ac power system is presented.

  4. Underground pumped hydroelectric storage

    NASA Astrophysics Data System (ADS)

    Allen, R. D.; Doherty, T. J.; Kannberg, L. D.

    1984-07-01

    Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-velocity requirements of a greater metropolitan area with population of 1 million or more.

  5. [Effect of warm waters of the Konakovskaia hydro-electric power plant on the infectibility of the young of the roach with Myxosporidia].

    PubMed

    Solomatova, V P; Luzin, A V; Iarmolinskiĭ, A A

    1976-01-01

    Data are given on the effect of warm waters of the Kanakovskaya hydro-electric power station on the infection level of the roach young with myxosporidians. 1641 one-year old specimens of roach were examined. 11 species of myxosporidians are reported from the zone of warm waters influence while in the control gulf beyond the warming zone--only 7 species. Within the larval period only two species, Chloromyxum legeri and Zschokkella costata, were recorded. Their developmental cycle was retraced. Under the influence of warm waters the developmental period from plasmodium to spore in Ch. legeri is accelerated: from 20 days to "cold" waters to 15 days in "warm" ones. In winter period in warm water zone a sporeformation of many species of myxosporidians takes place. At the same time the infection with plasmodial stages keeps on a high level that indicates to a continuous active feeding of the young even in winter.

  6. S. 549: A Bill to extend the deadline under the Federal Power Act applicable to the construction of three hydroelectric projects in the State of Arkansas. Introduced in the Senate of the United States, One Hundred Fourth Congress, First session

    SciTech Connect

    1995-12-31

    This document contains S.549, a Bill to extend the deadline under the Federal Power Act applicable to the construction of three hydroelectric projects in the State of Arkansas. This bill was introduced in the Senate of the United States, 104th Congress, First session, March 14, 1995.

  7. Fall Chinook Salmon Spawning Activity Versus Daylight and Flow in the Tailrace of a Large Hydroelectric Dam

    SciTech Connect

    McMichael, Geoffrey A.; McKinstry, Craig A.; Vucelick, Jessica A.; Lukas, Joe

    2005-05-01

    We deployed an acoustic system during the fall Chinook salmon (Oncorhynchus tshawytscha) spawning season in 2001 to determine whether fall Chinook salmon spawning activity in a hydroelectric dam tailrace area was affected by daylight or river flow dynamics. The system was deployed following a randomized study design to record fall Chinook salmon spawning activity during day and night periods in two index areas downstream of Wanapum Dam on the Columbia River in Washington, USA. One index area was a deepwater spawning area located (river kilometer (rkm) 663) in 9 to 11 m of water. The other index site was a moderate depth mid-channel bar, where water depths ranged from 2.5 to 6 m. The acoustic system was used to collect spawning activity data during free-drifts in a boat through the index areas. Spawning activity was defined as digs per minute from underwater sound recordings. Fall Chinook salmon spawning activity in the Wanapum Dam tailrace was influenced by daylight and river discharge. Results showed there was a substantial amount of spawning activity occurring during both daylight and darkness. However, there was significantly more spawning activity during daylight than at night in both index areas. Spawning activity was also affected by flow. Project discharge had a pronounced non-linear effect on spawning activity. Spawning activity was generally highest at project discharges between 1,700 and 2266 m3 sec-1 in both spawning areas, with reduced activity as discharge increased to between 3,400 and 4,250 m3 sec-1. We concluded that fall Chinook salmon spawning activity in highly variable environments was affected more by flow (and velocity) than by daylight.

  8. Categorization of the trophic status of a hydroelectric power plant reservoir in the Brazilian Amazon by statistical analyses and fuzzy approaches.

    PubMed

    da Costa Lobato, Tarcísio; Hauser-Davis, Rachel Ann; de Oliveira, Terezinha Ferreira; Maciel, Marinalva Cardoso; Tavares, Maria Regina Madruga; da Silveira, Antônio Morais; Saraiva, Augusto Cesar Fonseca

    2015-02-15

    The Amazon area has been increasingly suffering from anthropogenic impacts, especially due to the construction of hydroelectric power plant reservoirs. The analysis and categorization of the trophic status of these reservoirs are of interest to indicate man-made changes in the environment. In this context, the present study aimed to categorize the trophic status of a hydroelectric power plant reservoir located in the Brazilian Amazon by constructing a novel Water Quality Index (WQI) and Trophic State Index (TSI) for the reservoir using major ion concentrations and physico-chemical water parameters determined in the area and taking into account the sampling locations and the local hydrological regimes. After applying statistical analyses (factor analysis and cluster analysis) and establishing a rule base of a fuzzy system to these indicators, the results obtained by the proposed method were then compared to the generally applied Carlson and a modified Lamparelli trophic state index (TSI), specific for trophic regions. The categorization of the trophic status by the proposed fuzzy method was shown to be more reliable, since it takes into account the specificities of the study area, while the Carlson and Lamparelli TSI do not, and, thus, tend to over or underestimate the trophic status of these ecosystems. The statistical techniques proposed and applied in the present study, are, therefore, relevant in cases of environmental management and policy decision-making processes, aiding in the identification of the ecological status of water bodies. With this, it is possible to identify which factors should be further investigated and/or adjusted in order to attempt the recovery of degraded water bodies. Copyright © 2014 Elsevier B.V. All rights reserved.

  9. Analysis of legal obstacles and incentives to the development of low-head hydroelectric power in Maine

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maine is discussed. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined. The first step any developer of small-scale hydropower must take is to acquire right, title, or interest in the real property. In Maine, that step requires acquisition in some form of both river banks, the river bed, and where necessary, the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important, for only a use of water by a riparian owner is deemed a reasonable use and hence a legal use. A non-riparian could not draw water from a stream to increase the water level of an impoundment area on another stream. Apart from the usual methods of land acquisition involving sale, lease, or perhaps gift, Maine has two somewhat unique methods a developer may use for property acquisition. These methods, authorized by statute, are use of the abandoned dams law and use of the Mill Dam Act for flowage of upstream impoundment areas.

  10. Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (India, NW Himalaya)

    NASA Astrophysics Data System (ADS)

    Draganits, Erich; Gier, Susanne; Hofmann, Christa-Ch.; Janda, Christoph; Bookhagen, Bodo; Grasemann, Bernhard

    2014-08-01

    300 MW Baspa II is India's largest private hydroelectric facility, located at the Baspa River which is an important left-hand tributary to the Sutlej River in the NW Himalaya (India). In this valley the Sangla palaeo-lake has been dammed around 8200 yr BP behind a rock-avalanche dam and Baspa II is located exactly on top of this palaeo-lake. This special location represents a very rare possibility to evaluate the short-term, river load and hydrological parameters measured during the planning and operational stages of Baspa II with the long-term parameters gained from the palaeo-lake sediments from the catchment. Sedimentological and geomorphological investigations of the lacustrine sediments have been used to reconstruct environmental changes during >2500 years of its existence. The Mid-Holocene erosion rates of the Baspa catchment estimated from the volume and duration of deposition of the exposed lake sediments are at 0.7-1.0 mm yr-1, almost identical with the modern erosion rates calculated from river gauge data from Baspa II. Several charcoal layers and charcoal pieces from the uppermost palaeo-lake levels around 5000 cal yr BP might be related to woodland clearance and they possibly represent one of the oldest evidences for human presence in the Baspa Valley during Neolithic time.

  11. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: Bull Run, Portland, Oregon

    SciTech Connect

    1980-05-01

    The National Conference of State Legislatures' Small-Scale Hydroelectric Policy Project is designed to assist selected state legislatures in looking at the benefits that a state can derive from the development of small-scale hydro, and in carrying out a review of state laws and regulations that affect the development of the state's small-scale hydro resources. The successful completion of the project should help establish state statutes and regulations that are consistent with the efficient development of small-scale hydro. As part of the project's work with state legislatures, seven case studies of small-scale hydro sites were conducted to provide a general analysis and overview of the significant problems and opportunities for the development of this energy resource. The case study approach was selected to expose the actual difficulties and advantages involved in developing a specific site. Such an examination of real development efforts will clearly reveal the important aspects about small-scale hydro development which could be improved by statutory or regulatory revision. Moreover, the case study format enables the formulation of generalized opportunities for promoting small-scale hydro based on specific development experiences. The case study for small-scale hydro power development at the City of Portland's water reserve in the Bull Run Forest is presented with information included on the Bull Run hydro power potential, current water usage, hydro power regulations and plant licensing, technical and economic aspects of Bull Run project, and the environmental impact. (LCL)

  12. Influence of environmental parameters on the concentration of subsurface dissolved methane in two hydroelectric power plants in Brazil

    NASA Astrophysics Data System (ADS)

    Silva, M. G.; Marani, L.; Alvala, P. C.

    2013-12-01

    Methane (CH4) is a trace gas in the atmosphere of great importance for atmospheric chemistry as one of the main greenhouse gases. There are different sources with the largest individual production associated with the degradation of organic matter submerged in flooded areas. The amount of dissolved methane that reaches the surface depends on the production in the sediments and consumption in the water column. Both processes are associated with microbial activity and consequently dependent on the physico-chemical environmental conditions. The construction of hydroelectric dams cause flooding of areas near the river that can change the characteristics of the environment and cause changes in subsurface methane concentration. In this work, we studied two hydroelectric plants located in Brazil: Batalha (17°20'39.52"S, 47°29'34.29"W), under construction when the samples were take, and Itaipu (25°24'45.00"S, 54°35'39.00"W) which has been floated over 30 years ago. The water samples to determine dissolved methane were collected approximately 5 cm near the surface. In each collection point was measured depth, water temperature, pH and redox potential. The range of dissolved methane between the two dams was similar: 0.07-10.33 μg/l (Batalha) and 0.15-10.93 μg/l (Itaipu). However, the Batalha's average (4.04 × 3.43 μg/l; median = 3.66 μg/l) was higher than that observed in Itaipu (2.15 × 1.59 μg/l; median = 2.53 μg/l). The influence of environmental parameters on the concentration of dissolved methane was evaluated by multivariate statistical techniques (Principal Component Analysis - PCA). All of the parameters had some correlation with dissolved methane, however, the greatest contribution in Batalha was associated with pH while in Itaipu was the depth. The pH variation of the various points studied in Batalha may be associated with periods of drought and flooding of the river and hence the incorporation of organic matter in the environment. The organisms

  13. Large autonomous spacecraft electrical power system (LASEPS)

    NASA Technical Reports Server (NTRS)

    Dugal-Whitehead, Norma R.; Johnson, Yvette B.

    1992-01-01

    NASA - Marshall Space Flight Center is creating a large high voltage electrical power system testbed called LASEPS. This testbed is being developed to simulate an end-to-end power system from power generation and source to loads. When the system is completed it will have several power configurations, which will include several battery configurations. These configurations are: two 120 V batteries, one or two 150 V batteries, and one 250 to 270 V battery. This breadboard encompasses varying levels of autonomy from remote power converters to conventional software control to expert system control of the power system elements. In this paper, the construction and provisions of this breadboard are discussed.

  14. Large autonomous spacecraft electrical power system (LASEPS)

    NASA Technical Reports Server (NTRS)

    Dugal-Whitehead, Norma R.; Johnson, Yvette B.

    1992-01-01

    NASA - Marshall Space Flight Center is creating a large high voltage electrical power system testbed called LASEPS. This testbed is being developed to simulate an end-to-end power system from power generation and source to loads. When the system is completed it will have several power configurations, which will include several battery configurations. These configurations are: two 120 V batteries, one or two 150 V batteries, and one 250 to 270 V battery. This breadboard encompasses varying levels of autonomy from remote power converters to conventional software control to expert system control of the power system elements. In this paper, the construction and provisions of this breadboard are discussed.

  15. Underground pumped hydroelectric storage

    SciTech Connect

    Allen, R.D.; Doherty, T.J.; Kannberg, L.D.

    1984-07-01

    Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-leveling requirements of a greater metropolitan area with population of 1 million or more. The technical feasibility of UPHS depends upon excavation of a subterranean powerhouse cavern and reservoir caverns within a competent, impervious rock formation, and upon selection of reliable and efficient turbomachinery - pump-turbines and motor-generators - all remotely operable.

  16. [Effects of the installation of the Rosal hydroelectric power station, Itabapoana River, States of Espírito Santo and Rio de Janeiro, on anophelinae, planorbidae and phlebotominae].

    PubMed

    Rezende, Helder Ricas; Sessa, Paulo Augusto; Ferreira, Adelson Luiz; dos Santos, Claudiney Biral; Leite, Gustavo Rocha; Falqueto, Aloísio

    2009-01-01

    The construction of dams usually changes the composition of the fauna within their areas of influence. In the area where the Rosal hydroelectric power station has been installed, in the States of Espírito Santo and Rio de Janeiro, changes to the abundance of anophelinae, planorbidae and phlebotominae were evaluated before (1998-2000) and after (2000-2005) the damming. Nine sample collection points were defined, each represented by a home and its outbuildings, shelters for domestic animals and water collection points within a radius of 150m. One hundred and three adult anophelinae were collected before the damming and 313 afterwards; 200 immature anophelinae before and 708 afterwards; 868 planorbidae before and 486 afterwards; and 2,979 phlebotominae before and 912 afterwards. The vector record, consisting of anophelinae, planorbidae and phlebotominae, shows the potential of this area for transmission of malaria, schistosomiasis and American cutaneous leishmaniasis. However, the environmental changes did not increase the risk of the occurrence of these diseases.

  17. Displacement back analysis for a high slope of the Dagangshan Hydroelectric Power Station based on BP neural network and particle swarm optimization.

    PubMed

    Liang, Zhengzhao; Gong, Bin; Tang, Chunan; Zhang, Yongbin; Ma, Tianhui

    2014-01-01

    The right bank high slope of the Dagangshan Hydroelectric Power Station is located in complicated geological conditions with deep fractures and unloading cracks. How to obtain the mechanical parameters and then evaluate the safety of the slope are the key problems. This paper presented a displacement back analysis for the slope using an artificial neural network model (ANN) and particle swarm optimization model (PSO). A numerical model was established to simulate the displacement increment results, acquiring training data for the artificial neural network model. The backpropagation ANN model was used to establish a mapping function between the mechanical parameters and the monitoring displacements. The PSO model was applied to initialize the weights and thresholds of the backpropagation (BP) network model and determine suitable values of the mechanical parameters. Then the elastic moduli of the rock masses were obtained according to the monitoring displacement data at different excavation stages, and the BP neural network model was proved to be valid by comparing the measured displacements, the displacements predicted by the BP neural network model, and the numerical simulation using the back-analyzed parameters. The proposed model is useful for rock mechanical parameters determination and instability investigation of rock slopes.

  18. Displacement Back Analysis for a High Slope of the Dagangshan Hydroelectric Power Station Based on BP Neural Network and Particle Swarm Optimization

    PubMed Central

    Liang, Zhengzhao; Gong, Bin; Tang, Chunan; Zhang, Yongbin; Ma, Tianhui

    2014-01-01

    The right bank high slope of the Dagangshan Hydroelectric Power Station is located in complicated geological conditions with deep fractures and unloading cracks. How to obtain the mechanical parameters and then evaluate the safety of the slope are the key problems. This paper presented a displacement back analysis for the slope using an artificial neural network model (ANN) and particle swarm optimization model (PSO). A numerical model was established to simulate the displacement increment results, acquiring training data for the artificial neural network model. The backpropagation ANN model was used to establish a mapping function between the mechanical parameters and the monitoring displacements. The PSO model was applied to initialize the weights and thresholds of the backpropagation (BP) network model and determine suitable values of the mechanical parameters. Then the elastic moduli of the rock masses were obtained according to the monitoring displacement data at different excavation stages, and the BP neural network model was proved to be valid by comparing the measured displacements, the displacements predicted by the BP neural network model, and the numerical simulation using the back-analyzed parameters. The proposed model is useful for rock mechanical parameters determination and instability investigation of rock slopes. PMID:25140345

  19. Large kinetic power in FRII radio jets

    NASA Astrophysics Data System (ADS)

    Ito, Hirotaka; Kino, Motoki; Kawakatu, Nozomu; Isobe, Naoki; Yamada, Shoichi

    2007-10-01

    We investigate the total kinetic powers ( L j) and ages ( t age) of powerful jets of four FR II radio sources (Cygnus A, 3C 223, 3C 284, and 3C 219) by the detail comparison of the dynamical model of expanding cocoons with observed ones. It is found that these sources have quite large kinetic powers with the ratio of L j to the Eddington luminosity ( L Edd) resides in 0.02< L j/ L Edd<10. Reflecting the large kinetic powers, we also find that the total energy stored in the cocoon ( E c) exceed the energy derived from the minimum energy condition ( E min ): 2< E c/ E min <160. This implies that a large amount of kinetic power is carried by invisible components such as thermal leptons (electron and positron) and/or protons.

  20. [Limnetic zooplankton run-off a high-head dam and their fate in a river with high current velocity (case of the Krasnoiarsk hydroelectric power station on the Yenisei river].

    PubMed

    Dubovskaia, O P; Gladyshev, M I; Makhutova, O N

    2004-01-01

    The vertical distribution of net zooplankton in head-water of Krasnoyarsk hydroelectric power station and its horizontal distribution in the tail-water were studied during two years in winter and summer seasons. In order to distinguish living and dead individuals the special staining was used. It was revealed that on average 77% of living plankton pass through high-head dam with deep water scoop to the tailwater. While passing through dam aggregates some individuals of the reservoir plankton are traumatized and die, that results in some increase of portion of dead individuals in the tail water near dam (from 3 to 6%). Alive zooplankton passed through the dam aggregates is eliminated under the Upper Yenisei highly turbulent conditions. There is approximately 10% of it in 32 km from the dam if compare with biomass in 20-40 m layer of reservoir, the portion of dead increases to 11%. The biomass of zooplankton suspended in the water column of the tail-water sometimes increases (till > 1 g/m3) due to large Copepoda Heteroscope borealis, which inhabits near-bottom and near-shore river zones and can be found in the central part of the river during reproductive period. Limnetic zooplankton from the reservoir cannot be considered as important food for planktivores in the tail-water.

  1. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... Grand Coulee Project Hydroelectric Authority (GCPHA) filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the P.E. Scooteney Wasteway Hydroelectric...

  2. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... Grand Coulee Project Hydroelectric Authority (GCPHA) filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the P.E. 16.4 Wasteway Hydroelectric...

  3. 77 FR 7143 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... Grand Coulee Project Hydroelectric Authority (GCPHA) filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the P.E. 46A Wasteway Hydroelectric...

  4. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts... Rule 2010 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and...

  5. Tsuwalhkalh Ti Tmicwa (The Land is Ours): Stat'imc Self-Determination in the Face of Large-Scale Hydro-electric Development

    NASA Astrophysics Data System (ADS)

    Moritz, Sarah Carmen

    In Canada, First Nations asserting authority over their lands are developing diverse strategies to overcome the state''s dogmatic insistence on jurisdictional sovereignty. This movement corresponds to the wider context of the challenges faced by indigenous people to use their own ways of knowing to resist or reformulate legal doctrines and political tenets based on colonial power. Interior Salish Stat'imc people identify themselves through a strong and ongoing social relationship with Sataqwa7, the Fraser River, and the "Valley of Plenty"---now known as the flooded Bridge River Valley---maintained through Stat'imc knowledge and cultural practice and demonstrated by talk of '"the Stat'imc right to fish" and Tsuwalhkalh Ti Tmicwa (The Land is Ours). Stat'imc fishers are prepared to contest and resist any regulatory system that is understood to impact this right to fish while they advocate their own ways of sustainable fishing and water management. Based on ethnographic research in collaboration with Stat'imc people, this thesis explores some of these often successful contestations especially in the context of increasing territorial governance and by example of the rapidly transforming relationship between Stat'imc, BC Hydro and the Province of BC. Interior Salish Stat'imc people are currently navigating through a significant phase of increasing jurisdiction and authority and recognition of (unsettled) territorial property relationships. This very dynamic process is marked by strategic collaborations, compensation for 'infringements' on St'a'imc Title and Rights, and conservation efforts to protect their home. An important example is the changing relationship between Stat'imc people and BC Hydro---a relationship between two groups with radically different cultures and agendas: Stat'imc people in a struggle for self-determination, social justice and cultural survival and BC Hydro, a corporate culture, with the agenda to provide hydro-electric power to BC, maintain

  6. Hydroelectricity production and forest conservation in watersheds.

    PubMed

    Guo, Zhongwei; Li, Yiming; Xiao, Xiangming; Zhang, Lin; Gan, Yaling

    2007-09-01

    Globally, particularly in developing countries, hydroelectricity production and economic growth occur together with ecosystem/biodiversity conservation in watersheds. There is a relationship between hydroelectricity production and ecosystem/biodiversity conservation in watersheds, centering on the supply and demand for ecosystem services of river water flow regulation and sediment retention. Here we show that, in the upper reach of the Yangtze River, hydroelectricity production of Three Gorges Hydroelectric Power Plant can form a beneficial relationship with forest conservation through the paid use (compensating residents for their cooperation in the conservation) of ecosystem services launched by the National Natural Forest Protection Project. This interaction can provide additional incentives to encourage local communities' long-term cooperation in conserving and protecting the restored forest ecosystems. Hydroelectricity plants also obtain benefits from this interaction. The industrialization of ecosystem services supply provides an operational framework for this beneficial interaction. Sustainable forest ecosystem conservation will require developing new institutions and policies and must involve local communities in the conservation and protection of their local forests.

  7. Environmental issues in relicensing hearings for Carolina Power & Light Company`s Walters Hydroelectric Plant on the Pigeon River, NC

    SciTech Connect

    Lawler, J.P.; Tracy, B.H.

    1995-12-31

    This paper summarizes modeling of the fate and transport of dioxin in the water column and sediments of a large hydrostation reservoir in connection with contested hearings before the Federal Energy Regulatory Commission (FERC) in 1991. Coupled differential equations of dioxin mass transport in the lake and in its underlying active sediment layer were solved analytically to estimate the period of time necessary for previously discharged dioxin to be sufficiently deeply buried in the lake`s sediments to remove it from uptake by bottom-dwelling organisms and meet state water quality standards.

  8. Feasible eigenvalue sensitivity for large power systems

    SciTech Connect

    Smed, T. . Dept. of Electric Power Systems)

    1993-05-01

    Traditional eigenvalue sensitivity for power systems requires the formulation of the system matrix, which lacks sparsity. In this paper, a new sensitivity analysis, derived for a sparse formulation, is presented. Variables that are computed as intermediate results in established eigen value programs for power systems, but not used further, are given a new interpretation. The effect of virtually any control action can be assessed based on a single eigenvalue-eigenvector calculation. In particular, the effect of active and reactive power modulation can be found as a multiplication of two or three complex numbers. The method is illustrated in an example for a large power system when applied to the control design for an HVDC-link.

  9. Attitude control of large solar power satellites

    NASA Technical Reports Server (NTRS)

    Oglevie, R. E.

    1978-01-01

    Satellite power systems are a promising future source of electrical energy. However, the very large size solar power satellites (relative to contemporary spacecraft) requires investigation of the resulting attitude control problems and of appropriate control techniques. The principal effects of the large size are a great increase in sensitivity to gravity-gradient torques and a great reduction in structural bending frequencies with the attendant likelihood of undesirable control system interaction. A wide variety of control techniques are investigated to define approaches that minimize implementation penalties. These techniques include space-constructed momentum wheels, gravity-gradient stabilization, quasi-inertial free-drift modes, and various reaction control thruster types, some of which reduce the implementation penalties to a few percent of the spacecraft mass. The control system/structural dynamic interaction problem is found to have a tractable solution. Some of the results can be applied to other large space structure spacecraft.

  10. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    NASA Astrophysics Data System (ADS)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  11. The variations of geomagnetic field in the region of the Sulaksky cascade of hydro-electric power station

    NASA Astrophysics Data System (ADS)

    Daniyalov, M. G.; Suleymanov, A. I.

    2012-04-01

    Technogenic intervention in nature while creation of large water basins disturbs developed dynamic balance in rock mass and activates seismic processes, i.e. causes the so-called exited earthquakes which are connected with water basin operation. Local changes of a magnetic field of the Earth can be the result of various physical processes, but the most probable - electromagnetic and piezomagnetic processes. In our case the rock piezomagnetism is considered to be the principal cause of local geomagnetic variations - change of their magnetization under the influence of mechanical pressure. The measurements were made 2 times a day at the same time to reveal the connection of geomagnetic field components variations with water basin level fluctuations. According to geomagnetic measurements of 1983-1989 it is determined, that relative changes of a vertical component δΖ much more exceed respective alterations of the module of a full vector δT that is indirect acknowledgement of magnetoelastic effect under natural conditions. We determined that in the period of intensive rising of water level and weight the sharp reduction of a vertical component in water basin is observed which depends not only on loading value, but also on filling speed. At stable level of a water basin slight increase of δΖ is observed which is explained by internal pressure relaxation process in the water basin basis. The empirical formula for calculation of changes of a vertical component of a field ΔΖ under the influence of loading during the water basin filling is observed. The numerical value of coefficient k,, calculated by the least square method as the interconnection coefficient between vertical component changes and changes of level of the Chirkeysky water basin according to measurements of 1983-1989 is: 5, 66 10-4 nano-tesla / Pa. Ju. Skovorodkin obtained the numerical value of k coefficient: 6, 3 10-6 nano-tesla / Pa during the variations measurements of full vector module of

  12. Stability analysis of large electric power systems

    SciTech Connect

    Elwood, D.M.

    1993-01-01

    Modern electric power systems are large and complicated, and, in many regions of the world, the generation and transmission systems are operating near their limits. Ensuring the reliable operation of the power system requires engineers to study the response of the system to various disturbances. The responses to large disturbances are examined by numerically solving the nonlinear differential-algebraic equations describing the power system. The response to small disturbances is typically studied via eigenanalysis. The Electric Power Research Institute (EPRI) recently developed the Extended Transient/Mid-term Stability Program (ETMSP) to study large disturbance stability and the Small Signal Stability Program Package (SSSP) to study small signal stability. The primary objectives of the work described in this report were to (1) explore ways of speeding up ETMSP, especially on mid-term voltage stability problems, (2) explore ways of speeding up the Multi-Area Small-Signal Stability program (MASS), one of the codes in SSSP, and (3) explore ways of increasing the size of problem that can be solved by the Cray version of MASS.

  13. Economic analysis of large solar power plants

    NASA Astrophysics Data System (ADS)

    Klaiss, Helmut; Nitsch, Joachim; Geyer, Michael

    1987-11-01

    The current status and future potential of solar-tower, parabolic-reflector/Stirling-engine, channel-collector, and photovoltaic solar power plants of capacity 10 MWe or more are discussed. Consideration is given to the geographic and technological limitations, initial investment and operating costs, presently operating facilities, market openings, and critical technological challenges controlling future expansion. Numerical data are presented in tables and graphs, and it is concluded that solar power production will soon become economically competitive. It is suggested that the channel collector, at present the most mature and cost-efficient technology, has the least potential for further improvement, and that parabolic/Stirling and photovoltaic systems are probably better suited to smaller applications than to large-scale commercial power production.

  14. SPEAR3 LARGE DC MAGNET POWER SUPPLIES

    SciTech Connect

    de Lira, A

    2004-06-23

    The Stanford Synchrotron Radiation Laboratory (SSRL) has successfully commissioned SPEAR3, its newly upgraded 3-GeV synchrotron light source. First stored beam occurred December 15, 2003 and 100mA operation was reached on January 20, 2004. This paper describes the specification, design, and performance of the SPEAR3 DC magnet large power supplies (LGPS) that consist of tightly-regulated (better than {+-}10 ppm) current sources ranging from 100A to 225A and output powers ranging from 70kW to 135kW. A total of 6 LGPS are in successful operation and are used to power strings of quadrupoles and sextupoles. The LGPS are isolated by a delta/delta-wye 60Hz step-down transformer that provides power to 2 series-connected chopper stages operating phase-shifted at a switching frequency of 18-kHz to provide for fast output response and high efficiency. Also described are outside procurement aspects, installation, in-house testing, and operation of the power supplies.

  15. The possible negative consequences of underground dam and reservoir construction and operation in coastal karst areas: an example of the hydro-electric power plant (HEPP) Ombla near Dubrovnik (Croatia)

    NASA Astrophysics Data System (ADS)

    Roje-Bonacci, T.; Bonacci, O.

    2013-08-01

    The Ombla Spring represents a typical abundant coastal karst spring located in the vicinity of the town of Dubrovnik (Croatia). Its outlet is at an altitude of 2.5 m above sea level (m a.s.l.) and the water from it immediately flows into the Adriatic Sea. The minimum and maximum measured discharges are 3.96 m3 s-1 and 117 m3 s-1, respectively. The Trebišnjica River traverses through its catchment. The mean annual discharge, after the canalization of over 60 km of its watercourse with spray concrete (in the time span 1981-2011), is 24.05 m3 s-1. Before massive civil engineering work which took place during 1968-1980, the mean annual discharge was 28.35 m3 s-1. There is a project for construction of the hydro-electric power plant (HEPP) Ombla, which will exclusively use groundwater from the Ombla Spring karst aquifer. The underground dam will be constructed about 200 m behind the existing karst spring outflow in the karst massif, by injecting a grout curtain. The top of the grout curtain is planned to be at an altitude of 130 m a.s.l. This karst system is complex, sensitive, vulnerable and ecologically extremely valuable. The grout curtain, as well as the HEPP Ombla development, could lead to extremely dangerous technical and environmental consequences. In this paper some probable, negative consequences of the HEPP Ombla construction and development are explained. The HEPP Ombla could result in many large and hard-to-predict negative consequences which are specific for this particular HEPP, for example (1) severe spring discharge change; (2) unpredictable regional groundwater redistribution; (3) threatening of endemic fauna; (4) induced seismicity; (5) induced sinkholes; (6) occurrence of landslides; (7) conflict regarding internationally shared karst aquifers; (8) intensification of karst flash floods; (9) sea water intrusion in coastal karst aquifer; etc.

  16. Precipitation Estimates for Hydroelectricity

    NASA Technical Reports Server (NTRS)

    Tapiador, Francisco J.; Hou, Arthur Y.; de Castro, Manuel; Checa, Ramiro; Cuartero, Fernando; Barros, Ana P.

    2011-01-01

    Hydroelectric plants require precise and timely estimates of rain, snow and other hydrometeors for operations. However, it is far from being a trivial task to measure and predict precipitation. This paper presents the linkages between precipitation science and hydroelectricity, and in doing so it provides insight into current research directions that are relevant for this renewable energy. Methods described include radars, disdrometers, satellites and numerical models. Two recent advances that have the potential of being highly beneficial for hydropower operations are featured: the Global Precipitation Measuring (GPM) mission, which represents an important leap forward in precipitation observations from space, and high performance computing (HPC) and grid technology, that allows building ensembles of numerical weather and climate models.

  17. Precipitation Estimates for Hydroelectricity

    NASA Technical Reports Server (NTRS)

    Tapiador, Francisco J.; Hou, Arthur Y.; de Castro, Manuel; Checa, Ramiro; Cuartero, Fernando; Barros, Ana P.

    2011-01-01

    Hydroelectric plants require precise and timely estimates of rain, snow and other hydrometeors for operations. However, it is far from being a trivial task to measure and predict precipitation. This paper presents the linkages between precipitation science and hydroelectricity, and in doing so it provides insight into current research directions that are relevant for this renewable energy. Methods described include radars, disdrometers, satellites and numerical models. Two recent advances that have the potential of being highly beneficial for hydropower operations are featured: the Global Precipitation Measuring (GPM) mission, which represents an important leap forward in precipitation observations from space, and high performance computing (HPC) and grid technology, that allows building ensembles of numerical weather and climate models.

  18. Wildlife and Wildlife Habitat Mitigation Plan for the Thompson Falls Hydroelectric Project, Final Report.

    SciTech Connect

    Bissell, Gael; Wood, Marilyn

    1985-08-01

    This document presents a preliminary mitigation and enhancement plan for the Thompson Falls hydroelectric project. It discusses options available to provide wildlife protection, mitigation and enhancement in accordance with the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L. 96-501). The options focus on mitigation for wildlife and wildlife habitat losses attributable to the construction of the hydroelectric project. These losses were previously estimated from the best available information concerning the degree of negative and positive impacts to target wildlife species (Wood and Olsen 1984). Criteria by which the mitigation alternatives were evaluated were the same as those used to assess the impacts identified in the Phase I document (Wood and Olsen 1984). They were also evaluated according to feasibility and cost effectiveness. This document specifically focuses on mitigation for target species which were identified during Phase I (Wood and Olsen 1984). It was assumed mitigation and enhancement for the many other target wildlife species impacted by the hydroelectric developments will occur as secondary benefits. The recommended mitigation plan includes two recommended mitigation projects: (1) development of wildlife protection and enhancement plans for MPC lands and (2) strategies to protect several large islands upstream of the Thompson Falls reservoir. If implemented, these projects would provide satisfactory mitigation for wildlife losses associated with the Thompson Falls hydroelectric project. The intent of the mitigation plan is to recommend wildlife management objectives and guidelines. The specific techniques, plans, methods and agreements would be developed is part of the implementation phase.

  19. Enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling. Technical report

    SciTech Connect

    Morton, D.P.

    1994-01-01

    Handling uncertainty in natural inflow is an important part of a hydroelectric scheduling model. In a stochastic programming formulation, natural inflow may be modeled as a random vector with known distribution, but the size of the resulting mathematical program can be formidable. Decomposition-based algorithms take advantage of special structure and provide an attractive approach to such problems. We develop an enhanced Benders decomposition algorithm for solving multistage stochastic linear programs. The enhancements include warm start basis selection, preliminary cut generation, the multicut procedure, and decision tree traversing strategies. Computational results are presented for a collection of stochastic hydroelectric scheduling problems. Stochastic programming, Hydroelectric scheduling, Large-scale Systems.

  20. Yacyreta hydroelectric project contract signed

    SciTech Connect

    Not Available

    1987-09-01

    On June 26, 1987 the $270 million contract for the supply of 20 large hydraulic turbines for the Yacyreta Hydroelectric Project was signed by the Entidad Binacional Yacyreta, (a binational agency created by the governments of Argentina and Paraguay for the development of Yacyreta), and by Voith Hydro, Inc., of York, Pennsylvania, and Canadian General Electric of Montreal, Canada. Under the terms of the contract, 9 turbine units will be supplied by Voith Hydro, Inc. from its York, Pennsylvania plant, 4 units by Canadian General Electric of Montreal, and 7 units by Metanac, a consortium of Argentine manufacturers, who will utilize technology and technical assistance from Voith and CGE. The Yacyreta Project is being built on the Parana River on the border between Argentina and Paraguay. Construction at the site commenced in late 1983. Voith's portion of this contrast represents approximately $130 million dollars worth of business for its York, Pennsylvania facility.

  1. Pumpspeicherbecken im Karstgrundwasserleiter des Weißen Jura der Schwäbischen Alb. Erste Ergebnisse aus der geologischen und hydrogeologischen Erkundung für die Planfeststellung Pumped-storage hydroelectric power plant in the Jurassic karst aquifer of the swabian alb, Germany

    NASA Astrophysics Data System (ADS)

    Neukum, Christoph; Köhler, Hans Joachim; Fernandez-Steeger, Tomas; Hennings, Sibylle; Azzam, Rafig

    2014-06-01

    Extensive geological and hydrogeological investigations have been undertaken for the planned pumped-storage hydroelectric power plant in "Blautal" (Swabian Alb, Germany) in order to characterise the Jurassic karst aquifer in which the lower reservoir will be constructed. The preferred option for the plant setup is to integrate the lower reservoir into the groundwater without sealing. Therefore, in order to reliably predict the impact of the pumped storage plant operations on the surrounding drinking water wells and groundwater dependent ecosystems, a comprehensive database has been developed to assess the hydraulic conditions of the karst aquifer. A large scale geological site investigation was carried out to characterise the rock mass and extensive hydraulic tests were performed in many boreholes. The results of the hydraulic characterisation were then implemented in a three dimensional flow model. In this paper, the first results of the geological and hydrogeological investigations are presented and discussed.

  2. How large customer direct power transaction mode give consideration to power generation cleaning and power saving

    NASA Astrophysics Data System (ADS)

    Liu, Yu; Zeng, Ming; Liu, Wei; Li, Ran

    2017-05-01

    The so-called Large Customers' Direct Power Transaction, refers to the mode that the users on high voltage level, or being seized of hold the large power or independent power distribution, have the qualification of purchasing electricity directly from the generation companies and pay reasonable electricity transmission and distribution fee to the power network enterprises because the transaction is through its transmission channel. The Direct Purchase promotes the marketization level of electricity trading, but there are some problems in its developing process, especially whether promotes the green optimal allocation of power resources, this paper aims to explore the solution.

  3. Preliminary analysis of legal obstacles and incentives to the development of low-head hydroelectric power in the northeastern United States

    SciTech Connect

    Not Available

    1980-05-01

    A preliminary analysis of the legal obstacles and incentives to the development of the low-head hydroelectric potential of the 19 northeastern US (Maine, New Hampshire, Vermont, Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Pennsylvania, Ohio, Indiana, Michigan, Illinois, Wisconsin, Kentucky, Maryland, Delaware, Virginia, and West Virginia) is presented. The statutes and case laws of the 19 states and the Federal government which affect developers of small dams are stressed. The legal uncertainty which confronts the developer of small dams and the regulatory burden to which the developer may be subjected once the uncertainty is resolved are emphasized.

  4. Variability in large-scale wind power generation: Variability in large-scale wind power generation

    SciTech Connect

    Kiviluoma, Juha; Holttinen, Hannele; Weir, David; Scharff, Richard; Söder, Lennart; Menemenlis, Nickie; Cutululis, Nicolaos A.; Danti Lopez, Irene; Lannoye, Eamonn; Estanqueiro, Ana; Gomez-Lazaro, Emilio; Bai, Jianhua; Wan, Yih-Huei; Milligan, Michael

    2015-10-25

    The paper demonstrates the characteristics of wind power variability and net load variability in multiple power systems based on real data from multiple years. Demonstrated characteristics include probability distribution for different ramp durations, seasonal and diurnal variability and low net load events. The comparison shows regions with low variability (Sweden, Spain and Germany), medium variability (Portugal, Ireland, Finland and Denmark) and regions with higher variability (Quebec, Bonneville Power Administration and Electric Reliability Council of Texas in North America; Gansu, Jilin and Liaoning in China; and Norway and offshore wind power in Denmark). For regions with low variability, the maximum 1 h wind ramps are below 10% of nominal capacity, and for regions with high variability, they may be close to 30%. Wind power variability is mainly explained by the extent of geographical spread, but also higher capacity factor causes higher variability. It was also shown how wind power ramps are autocorrelated and dependent on the operating output level. When wind power was concentrated in smaller area, there were outliers with high changes in wind output, which were not present in large areas with well-dispersed wind power.

  5. Large Eddy Simulation of Powered Fontan Hemodynamics

    PubMed Central

    Delorme, Y.; Anupindi, K.; Kerlo, A.E.; Shetty, D.; Rodefeld, M.; Chen, J.; Frankel, S.

    2012-01-01

    Children born with univentricular heart disease typically must undergo three open heart surgeries within the first 2–3 years of life to eventually establish the Fontan circulation. In that case the single working ventricle pumps oxygenated blood to the body and blood returns to the lungs flowing passively through the Total Cavopulmonary Connection (TCPC) rather than being actively pumped by a subpulmonary ventricle. The TCPC is a direct surgical connection between the superior and inferior vena cava and the left and right pulmonary arteries. We have postulated that a mechanical pump inserted into this circulation providing a 3–5 mmHg pressure augmentation will reestablish bi-ventricular physiology serving as a bridge-to-recovery, bridge-to-transplant or destination therapy as a “biventricular Fontan” circulation. The Viscous Impeller Pump (VIP) has been proposed by our group as such an assist device. It is situated in the center of the 4-way TCPC intersection and spins pulling blood from the vena cavae and pushing it into the pulmonary arteries. We hypothesized that Large Eddy Simulation (LES) using high-order numerical methods are needed to capture unsteady powered and unpowered Fontan hemodynamics. Inclusion of a mechanical pump into the CFD further complicates matters due to the need to account for rotating machinery. In this study, we focus on predictions from an in-house high-order LES code (WenoHemo™) for unpowered and VIP-powered idealized TCPC hemodynamics with quantitative comparisons to Stereoscopic Particle Imaging Velocimetry (SPIV) measurements. Results are presented for both instantaneous flow structures and statistical data. Simulations show good qualitative and quantitative agreement with measured data. PMID:23177085

  6. Large eddy simulation of powered Fontan hemodynamics.

    PubMed

    Delorme, Y; Anupindi, K; Kerlo, A E; Shetty, D; Rodefeld, M; Chen, J; Frankel, S

    2013-01-18

    Children born with univentricular heart disease typically must undergo three open heart surgeries within the first 2-3 years of life to eventually establish the Fontan circulation. In that case the single working ventricle pumps oxygenated blood to the body and blood returns to the lungs flowing passively through the Total Cavopulmonary Connection (TCPC) rather than being actively pumped by a subpulmonary ventricle. The TCPC is a direct surgical connection between the superior and inferior vena cava and the left and right pulmonary arteries. We have postulated that a mechanical pump inserted into this circulation providing a 3-5 mmHg pressure augmentation will reestablish bi-ventricular physiology serving as a bridge-to-recovery, bridge-to-transplant or destination therapy as a "biventricular Fontan" circulation. The Viscous Impeller Pump (VIP) has been proposed by our group as such an assist device. It is situated in the center of the 4-way TCPC intersection and spins pulling blood from the vena cavae and pushing it into the pulmonary arteries. We hypothesized that Large Eddy Simulation (LES) using high-order numerical methods are needed to capture unsteady powered and unpowered Fontan hemodynamics. Inclusion of a mechanical pump into the CFD further complicates matters due to the need to account for rotating machinery. In this study, we focus on predictions from an in-house high-order LES code (WenoHemo(TM)) for unpowered and VIP-powered idealized TCPC hemodynamics with quantitative comparisons to Stereoscopic Particle Imaging Velocimetry (SPIV) measurements. Results are presented for both instantaneous flow structures and statistical data. Simulations show good qualitative and quantitative agreement with measured data.

  7. 2D THD and 3D TEHD analysis of large spindle supported thrust bearings with pins and double layer system used in the three gorges hydroelectric generators

    NASA Astrophysics Data System (ADS)

    Huang, B.; Wu, Z. D.; Wu, J. L.; Wang, L. Q.

    2012-11-01

    A 2D THD model and a 3DTEHD model for large spindle supported thrust bearings were set up and used to analyze the lubrication performance of the Three Gorges test thrust beating withpins and double layer system developed by Alstom Power. The finite difference method was employed to solve the THD model, and the thermal-elasticdeformations in the pad and runner were obtained by the finite element software ANSYS11.0. The data transfer between the THD model and ANSYS11.0 was carried out automatically by an interface program.A detailed comparison between the experimental results and numerical predictions by the two different modelsset up in this paper was carried out. Poor agreement has been found between the theoretical results obtained by 2D THD model and experimental data, while 3D TEHD provides fairly good agreement, confirming the importance of thermal effects and thermal-elastic deformations in both pad and runner.

  8. 76 FR 54790 - Large Power Transformers From Korea

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... COMMISSION Large Power Transformers From Korea Determination On the basis of the record \\1\\ developed in the... Korea of large power transformers, provided for in subheadings 8504.23.00 and 8504.90.95 of the... of large power transformers from Korea. Accordingly, effective July 14, 2011, the...

  9. Optimal control of hydroelectric facilities

    NASA Astrophysics Data System (ADS)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  10. [Malaria and hematological aspects among residents to be impacted by reservoirs for the Santo Antônio and Jirau Hydroelectric Power Stations, Rondônia State, Brazil].

    PubMed

    Katsuragawa, Tony Hiroshi; Cunha, Roberto Penna de Almeida; de Souza, Daniele Cristina Apoluceno; Gil, Luiz Herman Soares; Cruz, Rafael Bastos; Silva, Alexandre de Almeida E; Tada, Mauro Shugiro; da Silva, Luiz Hildebrando Pereira

    2009-07-01

    In Rondônia State, Brazil, two new hydroelectric plants, Santo Antônio and Jirau, are scheduled for construction on the Madeira River, upriver from the State capital, Porto Velho. The current study analyzes malaria prevalence before the construction and provides information on the possible impacts of malaria burden related to the influx of thousands of persons attracted by direct and indirect employment opportunities. According to the findings, malaria is present throughout the region, with varying prevalence rates. The existence of potential asymptomatic malaria carriers among the local population may be epidemiologically relevant and should be considered in the malaria control programs organized by public authorities and companies responsible for building the power plants, aimed at early diagnosis and treatment, vector control, water supply, and infrastructure in the urban areas.

  11. Small-scale hydroelectric demonstration project: Reactivation of the Elk Rapids Hydroelectric Facility: Final operation and maintenance report

    SciTech Connect

    Miller, R.G.

    1987-03-01

    Information related to the reactivation of the Elk River Hydroelectric Power facility is reported. This report includes a history of the power plant, pertinent cost data, emergency action plans, inspections and testing, warranty work, operating problems, project data, monthly production data, and monthly operating and maintenance costs. 15 figs., 3 tabs.

  12. Power fluctuations, large deviations and turbulence

    SciTech Connect

    Bandi, Mahesh M; Chumakov, Sergei; Connaughton, Colm P

    2008-01-01

    We study local power fluctuations in numerical simulations of stationary, homogenous, isotropic turbulence in two and three dimensions with Gaussian forcing. Due to the near-Gaussianity of the one-point velocity distribution, the probability distribution function (pdf) of the local power is well modeled by the pdf of the product of two joint normally distributed variables. In appropriate units, this distribution is calculated exactly and shown to satisfy a Fluctuation Relation (FR) with a coefficient which depends on {epsilon}.

  13. 77 FR 52758 - Large Power Transformers From Korea

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... COMMISSION Large Power Transformers From Korea Determination On the basis of the record \\1\\ developed in the... the United States is materially injured, by reason of imports from Korea of large power transformers... power transformers from Korea were being sold at LTFV within the meaning of section 733(b) of the...

  14. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All... Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a. Date and Time of Meeting: Wednesday, August...

  15. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project...

  16. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal...

  17. Assessment of spermatogenesis and plasma sex steroids in a seasonal breeding teleost: a comparative study in an area of influence of a tributary, downstream from a hydroelectric power dam, Brazil.

    PubMed

    Domingos, Fabricio F T; Thomé, Ralph G; Arantes, Fabio P; Castro, Antonio Carlos S; Sato, Yoshimi; Bazzoli, Nilo; Rizzo, Elizete

    2012-12-01

    River damming and building of hydroelectric power plants interrupt the reproductive migration routes and change the major physicochemical parameters of water quality, with drastic consequences for populations of migratory fishes. The goal of this study was to evaluate proliferation and cell death during spermatogenesis and serum profiles of sex steroids in Prochilodus argenteus, from the São Francisco River, downstream from the Três Marias Dam. A total of 257 adult males were caught quarterly during a reproductive cycle in two sites: the first 34 km of the river after the dam (site 1) and the second 34-54 km after the dam (site 2), after the confluence with a tributary, the Abaeté River. Seasonal changes in the testicular activity associated with morphometric analyses of germ cells as well as proliferation and testicular apoptosis support a more active spermatogenesis in fish from site 2, where higher levels of sex steroids and gonadosomatic index (GSI) were also found. In site 1, fish presented low serum levels of testosterone, 17β-estradiol and 17α-hydroxyprogesterone and a low GSI during gonadal maturation. Spermatogonial proliferation (PCNA) and apoptosis (TUNEL) were more elevated in fish from site 1, but spermatocytes were mainly labelled in fish from site 2. Overall, these data demonstrate changes in testicular activity and plasma sex steroids in a neotropical teleost fish living downstream from a hydroelectric dam, supplying new data on fish reproduction in regulated rivers. Moreover, morphometric analyses associated with sex steroids profiles provide reliable tools to assess fish spermatogenesis under environmental stress conditions.

  18. High power/large area PV systems

    NASA Technical Reports Server (NTRS)

    Wise, Joseph; Baraona, Cosmo

    1987-01-01

    The major photovoltaic power system technology drivers for a wide variety of mission types were ranked. Each technology driver was ranked on a scale of high, medium, or low in terms of importance to each particular mission type. The rankings were then compiled to determine the overall importance of each driver over the entire range of space missions. In each case cost was ranked the highest.

  19. Equivalencing the Collector System of a Large Wind Power Plant

    SciTech Connect

    Muljadi, E.; Butterfield, C. P.; Ellis, A.; Mechenbier, J.; Hocheimer, J.; Young, R.; Miller, N.; Delmerico, R.; Zavadil, R.; Smith, J. C.

    2006-01-01

    As the size and number of wind power plants (also called wind farms) increases, power system planners will need to study their impact on the power system in more detail. As the level of wind power penetration into the grid increases, the transmission system integration requirements will become more critical [1-2]. A very large wind power plant may contain hundreds of megawatt-size wind turbines. These turbines are interconnected by an intricate collector system. While the impact of individual turbines on the larger power system network is minimal, collectively, wind turbines can have a significant impact on the power systems during a severe disturbance such as a nearby fault. Since it is not practical to represent all individual wind turbines to conduct simulations, a simplified equivalent representation is required. This paper focuses on our effort to develop an equivalent representation of a wind power plant collector system for power system planning studies. The layout of the wind power plant, the size and type of conductors used, and the method of delivery (overhead or buried cables) all influence the performance of the collector system inside the wind power plant. Our effort to develop an equivalent representation of the collector system for wind power plants is an attempt to simplify power system modeling for future developments or planned expansions of wind power plants. Although we use a specific large wind power plant as a case study, the concept is applicable for any type of wind power plant.

  20. Stowable large area solar power module

    SciTech Connect

    Hanak, J.J.

    1987-12-15

    A stowable, deployable large area solar module is described comprising: discrete, interconnected, flexible, large area solar panels; hinge means operatively disposed on the panels so as to provide for the relative planar displacement of the folded panels of the module when the panels are folded in overlying sandwiched relationship; the hinge means also operatively disposed so as to provide for the folded panels to be rolled into a stowable, substantially cylindrical configuration. The hinge means comprise: hinge knuckles associated with at least one edge of each large area panel, each of the knuckles including a passage therethrough adapted to receive pintle means, the knuckles of adjacent panels disposed in a spaced apart, generally coplanar, interdigitating relationship; and, flexible pintle means disposed so as to sequentially pass through the interdigitating knuckles, whereby the spaced apart knuckles allow for a degree of planar displacement of adjoining large area panels relative to one another, as well as allowing for the folding of the panels in a sandwiched relationship and the flexible pintle means allows for the panels to be rolled into the substantially cylindrical configuration.

  1. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... Energy Regulatory Commission Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have changed its name to Salmon Creek Hydroelectric Company, LLC for...

  2. Planar view of interior northwest side of lock wall, hydroelectric ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Planar view of interior northwest side of lock wall, hydro-electric power house and dam in background, westernmost section of lock, view towards northwest - St. Lucie Canal, St. Lucie Lock No. 1, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  3. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sutton Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and...

  4. EPA RE-Powering Mapper Large Scale

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. EPA developed national level site screening criteria in partnership with the U.S. Department of Energy (DOE) National Renewable Energy Laboratory (NREL) for wind, solar, biomass, and geothermal facilities. While the screening criteria demonstrate the potential to reuse contaminated land for renewable energy facilities, the criteria and data are neither designed to identify the best sites for developing renewable energy nor all-inclusive. Therefore, more detailed, site-specific analysis is necessary to identify or prioritize the best sites for developing renewable energy facilities based on the technical and economic potential. Please note that these sites were only pre-screened for renewable energy potential. The sites were not evaluated for land use constraints or current on the ground conditions. Additional research and site-specific analysis are needed to verify viability for renewable energy potential at a given site.

  5. H.R. 657: A Bill to extend the deadline under the Federal Power Act applicable to the construction of three hydroelectric projects in the State of Arkansas. Introduced in the House of Representatives, One Hundred Fourth Congress, First session

    SciTech Connect

    1995-12-31

    This legislation proposes extending the deadlines for commencement of construction of three FERC hydroelectric projects in the state of Arkansas for a maximum of three consecutive two year terms. The projects are identified as FERC projects 4204, 4660, and 4659.

  6. Hydroelectric Generating Facilities General Permit ...

    EPA Pesticide Factsheets

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  7. Energy Perspective: Is Hydroelectricity Green?

    ERIC Educational Resources Information Center

    Childress, Vincent W.

    2009-01-01

    The current worldwide concern over energy is primarily related to imported oil, oil drilling and refining capacity, and transportation capacity. However, this concern has bolstered interest in a broader range of "green" energy technologies. In this article, the author discusses the use of hydroelectricity as an alternative energy source…

  8. Energy Perspective: Is Hydroelectricity Green?

    ERIC Educational Resources Information Center

    Childress, Vincent W.

    2009-01-01

    The current worldwide concern over energy is primarily related to imported oil, oil drilling and refining capacity, and transportation capacity. However, this concern has bolstered interest in a broader range of "green" energy technologies. In this article, the author discusses the use of hydroelectricity as an alternative energy source…

  9. Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect

    Roberts, J. O.; Mosey, G.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

  10. Changes in human schistosomiasis levels after the construction of two large hydroelectric dams in central Côte d'Ivoire.

    PubMed Central

    N'Goran, E. K.; Diabate, S.; Utzinger, J.; Sellin, B.

    1997-01-01

    The construction of large dams has been shown to increase the prevalence and intensity of human schistosomiasis. However, until now no study had been carried out to assess the impact of such a project in Côte d'Ivoire. For Kossou and Taabo, two large dams which became operational in the 1970s, baseline data are available on schistosomiasis prevalence in the surrounding area before dam construction, so that the changes in schistosomiasis levels can be assessed. We re-evaluated the prevalence of Schistosoma haematobium and S. mansoni in November 1992, by analysing 548 urine and 255 stool samples, respectively, from schoolchildren from five villages around each lake. A marked increase in the overall prevalence of S. haematobium was observed, from 14% to 53% around Lake Kossou and from 0 to 73% around Lake Taabo. Baseline data for S. mansoni are only available for Lake Taabo, where a prevalence of 3% was found in 1979 and where the prevalence in 1992 was still low at 2%. The construction of these two large dams therefore led to little change in S. mansoni prevalence but to a significant increase in that of S. haematobium. PMID:9509626

  11. Forced response analysis of hydroelectric systems

    NASA Astrophysics Data System (ADS)

    Alligné, S.; Silva, P. C. O.; Béguin, A.; Kawkabani, B.; Allenbach, P.; Nicolet, C.; Avellan, F.

    2014-03-01

    At off-design operating points, Francis turbines develop cavitation vortex rope in the draft tube which may interact with the hydraulic system. Risk resonance assessment by means of eigenmodes computation of the system is usually performed. However, the system response to the excitation source induced by the cavitation vortex rope is not predicted in terms of amplitudes and phase. Only eigenmodes shapes with related frequencies and dampings can be predicted. Besides this modal analysis, the risk resonance assessment can be completed by a forced response analysis. This method allows identifying the contribution of each eigenmode into the system response which depends on the system boundary conditions and the excitation source location. In this paper, a forced response analysis of a Francis turbine hydroelectric power plant including hydraulic system, rotating train, electrical system and control devices is performed. First, the general methodology of the forced response analysis is presented and validated with time domain simulations. Then, analysis of electrical, hydraulic and hydroelectric systems are performed and compared to analyse the influence of control structures on pressure fluctuations induced by cavitation vortex rope.

  12. Feasibility Assessment of Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants

    SciTech Connect

    Douglas G. Hall

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MW) or small hydro (between 1 and 30 MW) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  13. Feasibility assessment of the water energy resources of the United States for new low power and small hydro classes of hydroelectric plants: Main report and Appendix A

    SciTech Connect

    Hall, Douglas G.; Reeves, Kelly S.; Brizzee, Julie; Lee, Randy D.; Carroll, Gregory R.; Sommers, Garold L.

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MWa) or small hydro (between 1 and 30 MWa) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  14. Environmental impacts of hydroelectric power and other anthropogenic developments on the hydromorphology and ecology of the Durance channel and the Etang de Berre, southeast France.

    PubMed

    Warner, Robin F

    2012-08-15

    The generation of electricity through hydropower can, along with other anthropogenic activities, degrade river hydromorphology and ecosystems. In this case, water for power generation is diverted from the River Durance to a canal, which services a chain of 17 power stations, with the lower three being in the catchment of the Etang de Berre. This means that excess water and sediments are discharged into the salt-water lagoon with enormous consequences for ecosystems there. This paper summarizes the impacts of HEP and other human activities on both the river and lagoonal systems. It also considers agency and government attempts to understand and counter the degradation of these systems, both to date and in the future, with the latter catering for the potential impacts of future human development and global warming. Copyright © 2012 Elsevier Ltd. All rights reserved.

  15. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    SciTech Connect

    Taddeucci, Joe

    2013-03-29

    double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction

  16. Comparison of Gross Greenhouse Gas Fluxes from Hydroelectric Reservoirs in Brazil with Thermopower Generation

    NASA Astrophysics Data System (ADS)

    Rogerio, J. P.; Dos Santos, M. A.; Matvienko, B.; dos Santos, E.; Rocha, C. H.; Sikar, E.; Junior, A. M.

    2013-05-01

    Widespread interest in human impacts on the Earth has prompted much questioning in fields of concern to the general public. One of these issues is the extent of the impacts on the environment caused by hydro-based power generation, once viewed as a clean energy source. From the early 1990s onwards, papers and studies have been challenging this assumption through claims that hydroelectric dams also emit greenhouse gases, generated by the decomposition of biomass flooded by filling these reservoirs. Like as other freshwater bodies, hydroelectric reservoirs produce gases underwater by biology decomposition of organic matter. Some of these biogenic gases are effective in terms of Global Warming. The decomposition is mainly due by anaerobically regime, emitting methane (CH4), nitrogen (N2) and carbon dioxide (CO2). This paper compare results obtained from gross greenhouse fluxes in Brazilian hydropower reservoirs with thermo power plants using different types of fuels and technology. Measurements were carried in the Manso, Serra da Mesa, Corumbá, Itumbiara, Estreito, Furnas and Peixoto reservoirs, located in Cerrado biome and in Funil reservoir located at Atlantic forest biome with well defined climatologically regimes. Fluxes of carbon dioxide and methane in each of the reservoirs selected, whether through bubbles and/or diffusive exchange between water and atmosphere, were assessed by sampling. The intensity of emissions has a great variability and some environmental factors could be responsible for these variations. Factors that influence the emissions could be the water and air temperature, depth, wind velocity, sunlight, physical and chemical parameters of water, the composition of underwater biomass and the operational regime of the reservoir. Based in this calculations is possible to conclude that the large amount of hydro-power studied is better than thermopower source in terms of atmospheric greenhouse emissions. The comparisons between the reservoirs studied

  17. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles...

  18. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles...

  19. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles...

  20. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles...

  1. Historically Large Geomagnetic Storms and Potential Electric Power Grid Impacts

    NASA Astrophysics Data System (ADS)

    Kappenman, J. G.

    2004-05-01

    While recent work has been done to examine the possible Dst Intensity of historically large geomagnetic storms, the impacts caused to modern day electric power grids from these storms occurs due to rapid rate-of-change of regional geomagnetic fields which in most cases are driven by large ionospheric electrojet current intensifications. These temporally and spatially dynamic disturbance morphologies are not well-characterized by Dst or other broad geomagnetic storm indices. For estimates of storm intensity that correctly scale the threat potential to electric power grids, it is necessary to describe the rate-of-change of geomagnetic field. The rate-of-change of the geomagnetic field (dB/dt usually measured in nT/min) creates at ground level a geoelectric field that causes the flow of geomagnetically-induced currents (GIC) through ground connection points in electric power grids. Therefore in general, the larger the dB/dt, the larger the resulting geo-electric field and GIC in exposed power grid infrastructures and the greater the operational impact these induced currents will have on the power grid. Both extensive modeling analysis and recent operational experience suggests that power grids are becoming more vulnerable to geomagnetic storms as they grow in size and complexity. Also, large power grid blackouts have occurred at relatively low geomagnetic storm intensities. For example, the regional disturbance intensity that triggered the Hydro Quebec collapse during the March 13, 1989 Superstorm only reached an intensity of 479 nT/min. Large numbers of power system impacts in the United States were also observed for intensities that ranged from 300 to 600 nT/min during this storm. Yet both recent and historical data indicate that storms with disturbance levels that range from 2000 nT/min to as much ~5000 nT/min may be possible over extensive regions at latitudes of concern for large continental power grids across North America and Europe. Large GIC have also been

  2. Power suppression at large scales in string inflation

    SciTech Connect

    Cicoli, Michele; Downes, Sean; Dutta, Bhaskar E-mail: sddownes@physics.tamu.edu

    2013-12-01

    We study a possible origin of the anomalous suppression of the power spectrum at large angular scales in the cosmic microwave background within the framework of explicit string inflationary models where inflation is driven by a closed string modulus parameterizing the size of the extra dimensions. In this class of models the apparent power loss at large scales is caused by the background dynamics which involves a sharp transition from a fast-roll power law phase to a period of Starobinsky-like slow-roll inflation. An interesting feature of this class of string inflationary models is that the number of e-foldings of inflation is inversely proportional to the string coupling to a positive power. Therefore once the string coupling is tuned to small values in order to trust string perturbation theory, enough e-foldings of inflation are automatically obtained without the need of extra tuning. Moreover, in the less tuned cases the sharp transition responsible for the power loss takes place just before the last 50-60 e-foldings of inflation. We illustrate these general claims in the case of Fibre Inflation where we study the strength of this transition in terms of the attractor dynamics, finding that it induces a pivot from a blue to a redshifted power spectrum which can explain the apparent large scale power loss. We compute the effects of this pivot for example cases and demonstrate how magnitude and duration of this effect depend on model parameters.

  3. A holistic approach towards optimal planning of hybrid renewable energy systems: Combining hydroelectric and wind energy

    NASA Astrophysics Data System (ADS)

    Dimas, Panagiotis; Bouziotas, Dimitris; Efstratiadis, Andreas; Koutsoyiannis, Demetris

    2014-05-01

    Hydropower with pumped storage is a proven technology with very high efficiency that offers a unique large-scale energy buffer. Energy storage is employed by pumping water upstream to take advantage of the excess of produced energy (e.g. during night) and next retrieving this water to generate hydro-power during demand peaks. Excess energy occurs due to other renewables (wind, solar) whose power fluctuates in an uncontrollable manner. By integrating these with hydroelectric plants with pumped storage facilities we can form autonomous hybrid renewable energy systems. The optimal planning and management thereof requires a holistic approach, where uncertainty is properly represented. In this context, a novel framework is proposed, based on stochastic simulation and optimization. This is tested in an existing hydrosystem of Greece, considering its combined operation with a hypothetical wind power system, for which we seek the optimal design to ensure the most beneficial performance of the overall scheme.

  4. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    NASA Astrophysics Data System (ADS)

    Popa, R.; Popa, F.; Popa, B.; Zachia-Zlatea, D.

    2010-08-01

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  5. ElGENANALYSlS OF LARGE ELECTRIC POWER SYSTEMS

    SciTech Connect

    Elwood, D. M.

    1991-02-01

    Modern electric power systems are large and complicated, and, in many regions, the generation and transmission systems are operating near their limits. Eigenanalysis is one of the tools used to analyze the behavior of these systems. Standard eigenvalue methods require that simplified models be used for these analyses; however, these simplified models do not adequately model all of the characteristics of large power systems. Thus, new eigenanalysis methods that can analyze detailed power system models are required. The primary objectives of the work described in this report were I) to determine the availability of eigenanalysis algorithms that are better than methods currently being applied and that could be used an large power systems and 2) to determine if vector supercomputers could be used to significantly increase the size of power systems that can be analyzed by a standard power system eigenanalysis code. At the request of the Bonneville Power Administration, the Pacific Northwest Laboratory (PNL) conducted a literature review of methods currently used for the eigenanalysis of large electric power systems, as well as of general eigenanalysis algorithms that are applicable to large power systems. PNL found that a number of methods are currently being used for the this purpose, and all seem to work fairly well. Furthermore, most of the general eigenanalysis techniques that are applicable to power systems have been tried on these systems, and most seem to work fairly well. One of these techniques, a variation of the Arnoldi method, has been incorporated into a standard power system eigenanalysis package. Overall, it appears that the general purpose eigenanalysis methods are more versatile than most of the other methods that have been used for power systems eigenanalysis. In addition, they are generally easier to use. For some problems, however, it appears that some of the other eigenanalysis methods may be better. Power systems eigenanalysis requires the

  6. Design, construction and evaluation of two large photovoltaic power systems

    SciTech Connect

    Solman, F. J.; Nichols, B. E.

    1980-01-01

    A description and comparison of two large photovoltaic electric power systems is presented. The smaller system is designed for economic viability in the near future and provides 70 to 90 percent of the electric requirements for its prime load, a daytime AM radio station. The second system is a stand-alone power system suitable for a remote residential and light industrial community. No electric utility grid is present at this location so the management of a backup Diesel generator is also required.

  7. Small-scale hydroelectric power demonstration project. Riegel Textile Corporation, Fries, Virginia plant hydro-project. Final operation and maintenance report

    SciTech Connect

    Not Available

    1983-12-01

    Riegel Textile Corporation completed a 2163 KW rated turbine generator project at its plant on the New River in Fries, Virginia. A new powerhouse was constructed to enclose a used 2900 HP vertical Kaplan turbine and Westinghouse generator. The turbine is a 4-bladed 72-inch S. Morgan Smith manufactured in 1939. At the original setting of 46 feet, the unit had a rating of 3880 HP and the generator had a rating of 3000 KVA. Overhaul and installation of the used equipment was accomplished by the plant maintenance department. Overhaul of the used equipment and preparation of the license application began in June 1979. Construction of the new powerhouse began in June 1980. On July 24, 1981, construction was completed, the new unit was synchronized with Appalachian Power Company, and the first electrical energy was produced. The installation of this equipment, in conjunction with existing equipment already in place, increased the total plant generating capacity to 5251 KW. A total of four generators are now used and approximately 75% of the manufacturing plant's electrical requirements are self-generated. The purpose of this report is to summarize the operating and maintenance activities, costs, and revenues for the first two years of operation.

  8. Reactor Power for Large Displacement Autonomous Underwater Vehicles

    SciTech Connect

    McClure, Patrick Ray; Reid, Robert Stowers; Poston, David Irvin; Dasari, Venkateswara Rao

    2016-08-24

    This is a PentaChart on reactor power for large displacement autonomous underwater vehicles. Currently AUVs use batteries or combinations of batteries and fuel cells for power. Battery/fuel cell technology is limited by duration. Batteries and cell fuels are a good match for some missions, but other missions could benefit greatly by a longer duration. The goal is the following: to design nuclear systems to power an AUV and meet design constraints including non-proliferation issues, power level, size constraints, and power conversion limitations. The action plan is to continue development of a range of systems for terrestrial systems and focus on a system for Titan Moon as alternative to Pu-238 for NASA.

  9. S. 737: A Bill to extend the deadlines applicable to certain hydroelectric projects, and for other purposes. Introduced in the Senate of the United States, One Hundred Fourth Congress, First session

    SciTech Connect

    1995-12-31

    This bill was proposed to extend the deadlines applicable to certain hydroelectric projects, and for other purposes. The bill proposes extending the deadlines applying to certain hydroelectric projects in West Virginia, Kentucky, Washington, Oregon, and Arkansas. It proposes limited exemptions for licensing provisions for a power transmission project in New Mexico, extends Alaska`s state jurisdiction over small hydroelectric projects in the state, and amends the jurisdiction of FERC for licensing fresh water hydroelectric projects in Hawaii.

  10. Controllable Bidirectional dc Power Sources For Large Loads

    NASA Technical Reports Server (NTRS)

    Tripp, John S.; Daniels, Taumi S.

    1995-01-01

    System redesigned for greater efficiency, durability, and controllability. Modern electronically controlled dc power sources proposed to supply currents to six electromagnets used to position aerodynamic test model in wind tunnel. Six-phase bridge rectifier supplies load with large current at voltage of commanded magnitude and polarity. Current-feedback circuit includes current-limiting feature giving some protection against overload.

  11. Generalized slow roll approximation for large power spectrum features

    SciTech Connect

    Dvorkin, Cora; Hu, Wayne

    2010-01-15

    We develop a variant of the generalized slow roll approach for calculating the curvature power spectrum that is well suited for order unity deviations in power caused by sharp features in the inflaton potential. As an example, we show that predictions for a step function potential, which has been proposed to explain order unity glitches in the cosmic microwave background temperature power spectrum at multipoles l=20-40, are accurate at the percent level. Our analysis shows that to good approximation there is a single source function that is responsible for observable features and that this function is simply related to the local slope and curvature of the inflaton potential. These properties should make the generalized slow roll approximation useful for inflation-model-independent studies of features, both large and small, in the observable power spectra.

  12. Rotor dynamic considerations for large wind power generator systems

    NASA Technical Reports Server (NTRS)

    Ormiston, R. A.

    1973-01-01

    Successful large, reliable, low maintenance wind turbines must be designed with full consideration for minimizing dynamic response to aerodynamic, inertial, and gravitational forces. Much of existing helicopter rotor technology is applicable to this problem. Compared with helicopter rotors, large wind turbines are likely to be relatively less flexible with higher dimensionless natural frequencies. For very large wind turbines, low power output per unit weight and stresses due to gravitational forces are limiting factors. The need to reduce rotor complexity to a minimum favors the use of cantilevered (hingeless) rotor configurations where stresses are relieved by elastic deformations.

  13. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    SciTech Connect

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  14. Hydroelectric power in Hawaii: a reconnaissance survey

    SciTech Connect

    1981-02-01

    The major conclusion of this study is that hydropower resources in the State of Hawaii are substantial, and they offer the potential for major increases in hydropower generating capacity. Hydropower resources on all islands total about 50 megawatts of potential generating capacity. Combined with the 18 megawatts of existing hydropower capacity, hydropower resources potentially could generate about 307 million kilowatt-hours of electric energy annually. This represents about 28% of the present combined electricity needs of the Neighbor Islands - Kauai, Molokai, Maui, and the Big Island. Hydropower resources on Kauai equal 72% of that island's electricity needs; on Molokai, 40%; on the Big Island, 20%; and on Maui, 18%. The island of Oahu, however, has only small hydropower resources, and could only generate a negligible portion of its electricity needs from this energy source. Existing and future (potential) hydropower capacities are summarized, and annual outputs for each island are estimated. Future hydropower facilities are subdivided into two categories, which show how much of the potential capacity is being actively considered for development, and how much is only tentatively proposed at the time.

  15. Federal financial assistance for hydroelectric power

    SciTech Connect

    Not Available

    1980-09-01

    The Rural Energy Initiative seeks to maximize the effectiveness of Federal programs in developing certain energy resources, including small-scale hydropower. The REI target is to arrange financing for 100 hydro sites by 1981, with about 300 MWe of additional capacity. The REI financial assistance programs for small hydropower development in the US DOE; Economic Development Administration; REA; HUD; Farmers Home Administration; DOI; DOL's CETA programs; and the Community Services Administration are described. (MCW)

  16. Research on unit commitment with large-scale wind power connected power system

    NASA Astrophysics Data System (ADS)

    Jiao, Ran; Zhang, Baoqun; Chi, Zhongjun; Gong, Cheng; Ma, Longfei; Yang, Bing

    2017-01-01

    Large-scale integration of wind power generators into power grid brings severe challenges to power system economic dispatch due to its stochastic volatility. Unit commitment including wind farm is analyzed from the two parts of modeling and solving methods. The structures and characteristics can be summarized after classification has been done according to different objective function and constraints. Finally, the issues to be solved and possible directions of research and development in the future are discussed, which can adapt to the requirements of the electricity market, energy-saving power generation dispatching and smart grid, even providing reference for research and practice of researchers and workers in this field.

  17. Hydroelectric dams in Amazon as source of GHG

    SciTech Connect

    Rosa, L.P.; Schaeffer, R.; Santos, M.A.

    1996-12-31

    A recent paper by Fearnside points out that hydroelectric development in Amazonia is a significant source of greenhouse gases (GHG) emissions. This conclusion is in contrast to the common belief that hydroelectric dams are better than fossil fuel use in electric power generation, from the view point of GHG emissions. The authors have considered both CH{sub 4} and CO{sub 2} emissions taking into account the instantaneous radiative forcing due to a unit increase in the concentration of gases, the decay times of gases in the atmosphere and the emissions patterns of emissions vary depending on biomass density and type of the forest area flooded, as well as on depth of flooding. As the Fearnside paper is more concerned with CO{sub 2} emissions from the above water biomass, the authors` focus will be restricted to the formulae for calculating the cumulative effect of CO{sub 2}.

  18. Improvement of Unbalanced Load Flow Program for Large Power Systems

    NASA Astrophysics Data System (ADS)

    Imai, Shinichi; Suzuki, Haruhiko; Iba, Kenji; Fujiwara, Shuhei

    The idea of unbalanced power flow calculation was proposed many years ago. At that time, however, the needs for such techniques was not an argent issue. But modern power system networks are comprised of long untransposed transmission lines. Therefore, for some kind of analysis, it is now almost impossible to treat a system as though it were a symmetrical network. The aims of most previous studies were oriented to solve voltage/current imbalance in local or small system because local imbalance was a serious concern. This is still an important issue, but more recently our needs have become concentrated on practical bulk power systems, since principal EHV lines are entirely untransposed. Following such a background, we have developed a practical unbalanced load flow program. This program was developed for steady state analysis of large scale of practical networks under many possible unbalanced conditions.

  19. High power microwave generation from a large orbit gyrotron

    SciTech Connect

    Lawson, W.; Destler, W.W.; Striffler, C.D.

    1985-10-01

    A study of the production of high power microwave radiation from a large orbit gyrotron in azimuthally periodic boundary systems has been conducted. Linear growth rates have been calculated for the 2 modes of magnetron-like hole-and-slot resonator (HASR) and vane resonator (VR) systems using a general growth rate formalism. The experiment involves the interaction of a 2.3 MeV, 1-2 kA, 5 ns rotating electron layer with the HASR and VR structures. Maximum power levels are about 300 MW in X band from a 10 slot HASR system; about 500 MW in Ku band from a 20 slot VR system; and about 15 MW in K band from about 30 slot systems. The peak efficiency is about 15%. The radiation characteristics are in reasonably good agreement with the theoretical predictions. The reduced power levels for about 30 slot systems are partially attributed to radial mode competition.

  20. PEP-II Large Power Supplies Rebuild Program at SLAC

    SciTech Connect

    Bellomo, P.; Lipari, J.J.; de Lira, A.C.; Rafael, F.S.; /SLAC

    2005-05-17

    Seven large power supplies (LGPS) with output ratings from 72kW to 270kW power PEP-II quad magnets in the electron-positron collider region. These supplies have posed serious maintenance and reliability problems since they were installed in 1997, resulting in loss of accelerator availability. A redesign/rebuild program was undertaken by the SLAC Power Conversion Department. During the 2004 summer shutdown all the control circuits in these supplies were redesigned and replaced. A new PWM control board, programmable logic controller, and touch panel have been installed to improve LGPS reliability, and to make troubleshooting easier. In this paper we present the details of this rebuilding program and results.

  1. Power-law time distribution of large earthquakes.

    PubMed

    Mega, Mirko S; Allegrini, Paolo; Grigolini, Paolo; Latora, Vito; Palatella, Luigi; Rapisarda, Andrea; Vinciguerra, Sergio

    2003-05-09

    We study the statistical properties of time distribution of seismicity in California by means of a new method of analysis, the diffusion entropy. We find that the distribution of time intervals between a large earthquake (the main shock of a given seismic sequence) and the next one does not obey Poisson statistics, as assumed by the current models. We prove that this distribution is an inverse power law with an exponent mu=2.06+/-0.01. We propose the long-range model, reproducing the main properties of the diffusion entropy and describing the seismic triggering mechanisms induced by large earthquakes.

  2. Large space systems technology electronics: Data and power distribution

    NASA Astrophysics Data System (ADS)

    Dunbar, W. G.

    1980-02-01

    The development of hardware technology and manufacturing techniques required to meet space platform and antenna system needs in the 1980s is discussed. Preliminary designs for manned and automatically assembled space power system cables, connectors, and grounding and bonding materials and techniques are reviewed. Connector concepts, grounding design requirements, and bonding requirements are discussed. The problem of particulate debris contamination for large structure spacecraft is addressed.

  3. Large space systems technology electronics: Data and power distribution

    NASA Technical Reports Server (NTRS)

    Dunbar, W. G.

    1980-01-01

    The development of hardware technology and manufacturing techniques required to meet space platform and antenna system needs in the 1980s is discussed. Preliminary designs for manned and automatically assembled space power system cables, connectors, and grounding and bonding materials and techniques are reviewed. Connector concepts, grounding design requirements, and bonding requirements are discussed. The problem of particulate debris contamination for large structure spacecraft is addressed.

  4. Large Scale Integration of Renewable Power Sources into the Vietnamese Power System

    NASA Astrophysics Data System (ADS)

    Kies, Alexander; Schyska, Bruno; Thanh Viet, Dinh; von Bremen, Lueder; Heinemann, Detlev; Schramm, Stefan

    2017-04-01

    The Vietnamese Power system is expected to expand considerably in upcoming decades. Power capacities installed are projected to grow from 39 GW in 2015 to 129.5 GW by 2030. Installed wind power capacities are expected to grow to 6 GW (0.8 GW 2015) and solar power capacities to 12 GW (0.85 GW 2015). This goes hand in hand with an increase of the renewable penetration in the power mix from 1.3% from wind and photovoltaics (PV) in 2015 to 5.4% by 2030. The overall potential for wind power in Vietnam is estimated to be around 24 GW. Moreover, the up-scaling of renewable energy sources was formulated as one of the priorized targets of the Vietnamese government in the National Power Development Plan VII. In this work, we investigate the transition of the Vietnamese power system towards high shares of renewables. For this purpose, we jointly optimise the expansion of renewable generation facilities for wind and PV, and the transmission grid within renewable build-up pathways until 2030 and beyond. To simulate the Vietnamese power system and its generation from renewable sources, we use highly spatially and temporally resolved historical weather and load data and the open source modelling toolbox Python for Power System Analysis (PyPSA). We show that the highest potential of renewable generation for wind and PV is observed in southern Vietnam and discuss the resulting need for transmission grid extensions in dependency of the optimal pathway. Furthermore, we show that the smoothing effect of wind power has several considerable beneficial effects and that the Vietnamese hydro power potential can be efficiently used to provide balancing opportunities. This work is part of the R&D Project "Analysis of the Large Scale Integration of Renewable Power into the Future Vietnamese Power System" (GIZ, 2016-2018).

  5. Jackson Mills and Mine Falls Dams, Nashua, New Hampshire. Reconnaissance Report, Hydroelectric Feasibility. Volume 2. Mine Falls Dam.

    DTIC Science & Technology

    1980-01-01

    terminus of the Mine Falls canal system until the 1950’s. Then, cheap oil became readily available and generation ceased. The region’s cur- rent...dependence on expensive imported oil , however, has aroused new interest in using New England’s numerous rivers for hydroelectric power. Senator John A...water is renewable and free. The hydroelectric power generated at the dam represents a savings in oil of 330,000 gallons each year. Now that the

  6. Large-Scale Data Challenges in Future Power Grids

    SciTech Connect

    Yin, Jian; Sharma, Poorva; Gorton, Ian; Akyol, Bora A.

    2013-03-25

    This paper describes technical challenges in supporting large-scale real-time data analysis for future power grid systems and discusses various design options to address these challenges. Even though the existing U.S. power grid has served the nation remarkably well over the last 120 years, big changes are in the horizon. The widespread deployment of renewable generation, smart grid controls, energy storage, plug-in hybrids, and new conducting materials will require fundamental changes in the operational concepts and principal components. The whole system becomes highly dynamic and needs constant adjustments based on real time data. Even though millions of sensors such as phase measurement units (PMUs) and smart meters are being widely deployed, a data layer that can support this amount of data in real time is needed. Unlike the data fabric in cloud services, the data layer for smart grids must address some unique challenges. This layer must be scalable to support millions of sensors and a large number of diverse applications and still provide real time guarantees. Moreover, the system needs to be highly reliable and highly secure because the power grid is a critical piece of infrastructure. No existing systems can satisfy all the requirements at the same time. We examine various design options. In particular, we explore the special characteristics of power grid data to meet both scalability and quality of service requirements. Our initial prototype can improve performance by orders of magnitude over existing general-purpose systems. The prototype was demonstrated with several use cases from PNNL’s FPGI and was shown to be able to integrate huge amount of data from a large number of sensors and a diverse set of applications.

  7. 77 FR 24949 - Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC; Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... Energy Regulatory Commission Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC... affected by issuance of a license for the proposed Red River Lock & Dam No. 4 Hydroelectric Project No... Hydroelectric LLC, as applicant for the proposed Red River Lock & Dam No. 4 Project No. 12757, is invited...

  8. Survey of future requirements for large space structures. [space platforms, large antennas, and power surfaces

    NASA Technical Reports Server (NTRS)

    Hedgepeth, J. M.

    1976-01-01

    The future requirements for large space structures were examined and the foundation for long range planning of technology development for such structures is provided. Attention is concentrated on a period after 1985 for actual use. Basic ground rule of the study was that applications be of significant importance and have promise of direct economic benefit to mankind. The inputs to the study came from visits to a large number of government and industrial organizations, written studies in current literature, and approximate analyses of potential applications. The paper identifies diverse space applications for large area structures in three general categories: (1) large surfaces for power, (2) large antenna to receive and transmit energy over the radio frequency bandwidth, and (3) space platforms to provide area for general utilizations.

  9. Development of large wind energy power generation system

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The background and development of an experimental 100 kW wind-energy generation system are described, and the results of current field tests are presented. The experimental wind turbine is a two-bladed down-wind horizontal axis propeller type with a 29.4 m diameter rotor and a tower 28 m in height. The plant was completed in March, 1983, and has been undergoing trouble-free tests since then. The present program calls for field tests during two years from fiscal 1983 to 1984. The development of technologies relating to the linkage and operation of wind-energy power generation system networks is planned along with the acquisition of basic data for the development of a large-scale wind energy power generation system.

  10. Probabilistic voltage security for large scale power systems

    NASA Astrophysics Data System (ADS)

    Poshtan, Majid

    2000-10-01

    Stability is one of the most important problems in power system operation and control. Voltage instability is one type of power system instability that occurs when the system operates close to its limits. Progressive voltage instability, which is also referred to as Voltage Collapse, results in loss of voltage at certain nodes (buses) in the system. Voltage collapse, a slowly occurring phenomena leading to loss of voltage at specific parts of an electric utility, has been observed in the USA, Europe, Japan, Canada, and other places in the world during the past decade. Voltage collapse typically occurs on power systems which are heavily loaded, faulted and/or have reactive power shortages. There are several power system's parameter changes known to contribute to voltage collapse. The most important contributors to voltage instability are: increasing load, generators or SVC reaching reactive power limits, action of tap-changing transformers, line tripping, and generator outages. The differences between voltage collapse and lack of classical transient stability is that in voltage collapse we focus on loads and voltage magnitudes whereas in classical transient stability the focus is on generators' dynamics and voltage angles. Also voltage collapse often includes longer time scale dynamics and includes the effects of continuous changes such as load increases in addition to discrete events such as line outages. Two conventional methods to analyze voltage collapse are P-V and V-Q curves, and modal analyses. Both methods are deterministic and do not encounter any probability for the contingencies causing the voltage collapse. The purpose of this investigation is to identify probabilistic indices to assess the steady-state voltage stability by considering random failures and their dependency in a large-scale power system. The research mainly continues the previous research completed at Tulane University by Dr. J. Bian and Professor P. Rastgoufard and will complement it by

  11. Power conditioning for large dc motors for space flight applications

    NASA Technical Reports Server (NTRS)

    Veatch, Martin S.; Anderson, Paul M.; Eason, Douglas J.; Landis, David M.

    1988-01-01

    The design and performance of a prototype power-conditioning system for use with large brushless dc motors on NASA space missions are discussed in detail and illustrated with extensive diagrams, drawings, and graphs. The 5-kW 8-phase parallel module evaluated here would be suitable for use in the Space Shuttle Orbiter cargo bay. A current-balancing magnetic assembly with low distributed inductance permits high-speed current switching from a low-voltage bus as well as current balancing between parallel MOSFETs.

  12. Power conditioning for large dc motors for space flight applications

    NASA Technical Reports Server (NTRS)

    Veatch, Martin S.; Anderson, Paul M.; Eason, Douglas J.; Landis, David M.

    1988-01-01

    The design and performance of a prototype power-conditioning system for use with large brushless dc motors on NASA space missions are discussed in detail and illustrated with extensive diagrams, drawings, and graphs. The 5-kW 8-phase parallel module evaluated here would be suitable for use in the Space Shuttle Orbiter cargo bay. A current-balancing magnetic assembly with low distributed inductance permits high-speed current switching from a low-voltage bus as well as current balancing between parallel MOSFETs.

  13. Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy reve

    SciTech Connect

    Jager, Yetta; Smith, Brennan T

    2008-02-01

    Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy revenue, while meeting other legal water requirements. Reservoir optimization schemes used in practice do not seek flow regimes that maximize aquatic ecosystem health. Here, we review optimization studies that considered environmental goals in one of three approaches. The first approach seeks flow regimes that maximize hydropower generation, while satisfying legal requirements, including environmental (or minimum) flows. Solutions from this approach are often used in practice to operate hydropower projects. In the second approach, flow releases from a dam are timed to meet water quality constraints on dissolved oxygen (DO), temperature and nutrients. In the third approach, flow releases are timed to improve the health of fish populations. We conclude by suggesting three steps for bringing multi-objective reservoir operation closer to the goal of ecological sustainability: (1) conduct research to identify which features of flow variation are essential for river health and to quantify these relationships, (2) develop valuation methods to assess the total value of river health and (3) develop optimal control softwares that combine water balance modelling with models that predict ecosystem responses to flow.

  14. Indian River Hydroelectric Project Grant

    SciTech Connect

    Rebecca Garrett

    2005-04-29

    This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

  15. Application of genetic based fuzzy systems to hydroelectric generation scheduling

    SciTech Connect

    Huang, S.J.

    1999-09-01

    An application of genetic based fuzzy systems to hydroelectric generation scheduling is presented in this paper. In the proposed approach, the system was fuzzified with respect to objectives and constraints. A genetic algorithm was included to further enhance the process of tuning membership functions. By this way, membership mappings for those important parameters can be optimally adjusted. The computation performance is thus improved. The proposed approach has been tested on Taiwan Power System (Taipower) through the utility data. Test results have demonstrated are feasibility and effectiveness of the proposed approach for the applications.

  16. Development of Large Current High Precision Pulse Power Supply

    NASA Astrophysics Data System (ADS)

    Takayanagi, Tomohiro; Koseki, Shoichiro; Kubo, Hiroshi; Katoh, Shuji; Ogawa, Shinichi

    JAEA and KEK are jointly constructing a high intensity proton accelerator project J-PARC. Its main accelerator is 3GeV synchrotron. Its injection bump magnets, especially horizontal paint bump magnets, are excited by large pulse currents. Their rated currents are over 10kA and pulse widths are about 1ms. Tracking errors are required to be less than 1%. Multiple connected two-quadrant IGBT choppers are adopted for their power supplies. Their output currents are controlled by feedback control with minor loop voltage control (m-AVR). When output current of a chopper intermits at small current, its output voltage rises up and current control becomes difficult. In this paper response of m-AVR and output voltage characteristics at current intermittent region are studied and an improved control scheme is proposed. The performance is confirmed by a test.

  17. Achievable flatness in a large microwave power transmitting antenna

    NASA Technical Reports Server (NTRS)

    Ried, R. C.

    1980-01-01

    A dual reference SPS system with pseudoisotropic graphite composite as a representative dimensionally stable composite was studied. The loads, accelerations, thermal environments, temperatures and distortions were calculated for a variety of operational SPS conditions along with statistical considerations of material properties, manufacturing tolerances, measurement accuracy and the resulting loss of sight (LOS) and local slope distributions. A LOS error and a subarray rms slope error of two arc minutes can be achieved with a passive system. Results show that existing materials measurement, manufacturing, assembly and alignment techniques can be used to build the microwave power transmission system antenna structure. Manufacturing tolerance can be critical to rms slope error. The slope error budget can be met with a passive system. Structural joints without free play are essential in the assembly of the large truss structure. Variations in material properties, particularly for coefficient of thermal expansion from part to part, is more significant than actual value.

  18. 77 FR 53177 - Large Power Transformers From the Republic of Korea: Antidumping Duty Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... International Trade Administration Large Power Transformers From the Republic of Korea: Antidumping Duty Order... antidumping duty order on large power transformers from the Republic of Korea (Korea). FOR FURTHER INFORMATION... in the antidumping duty investigation of large power transformers from Korea. See Large...

  19. Ferroelectric opening switches for large-scale pulsed power drivers.

    SciTech Connect

    Brennecka, Geoffrey L.; Rudys, Joseph Matthew; Reed, Kim Warren; Pena, Gary Edward; Tuttle, Bruce Andrew; Glover, Steven Frank

    2009-11-01

    Fast electrical energy storage or Voltage-Driven Technology (VDT) has dominated fast, high-voltage pulsed power systems for the past six decades. Fast magnetic energy storage or Current-Driven Technology (CDT) is characterized by 10,000 X higher energy density than VDT and has a great number of other substantial advantages, but it has all but been neglected for all of these decades. The uniform explanation for neglect of CDT technology is invariably that the industry has never been able to make an effective opening switch, which is essential for the use of CDT. Most approaches to opening switches have involved plasma of one sort or another. On a large scale, gaseous plasmas have been used as a conductor to bridge the switch electrodes that provides an opening function when the current wave front propagates through to the output end of the plasma and fully magnetizes the plasma - this is called a Plasma Opening Switch (POS). Opening can be triggered in a POS using a magnetic field to push the plasma out of the A-K gap - this is called a Magnetically Controlled Plasma Opening Switch (MCPOS). On a small scale, depletion of electron plasmas in semiconductor devices is used to affect opening switch behavior, but these devices are relatively low voltage and low current compared to the hundreds of kilo-volts and tens of kilo-amperes of interest to pulsed power. This work is an investigation into an entirely new approach to opening switch technology that utilizes new materials in new ways. The new materials are Ferroelectrics and using them as an opening switch is a stark contrast to their traditional applications in optics and transducer applications. Emphasis is on use of high performance ferroelectrics with the objective of developing an opening switch that would be suitable for large scale pulsed power applications. Over the course of exploring this new ground, we have discovered new behaviors and properties of these materials that were here to fore unknown. Some of

  20. High-power picosecond laser with 400W average power for large scale applications

    NASA Astrophysics Data System (ADS)

    Du, Keming; Brüning, Stephan; Gillner, Arnold

    2012-03-01

    Laser processing is generally known for low thermal influence, precise energy processing and the possibility to ablate every type of material independent on hardness and vaporisation temperature. The use of ultra-short pulsed lasers offers new possibilities in the manufacturing of high end products with extra high processing qualities. For achieving a sufficient and economical processing speed, high average power is needed. To scale the power for industrial uses the picosecond laser system has been developed, which consists of a seeder, a preamplifier and an end amplifier. With the oscillator/amplifier system more than 400W average power and maximum pulse energy 1mJ was obtained. For study of high speed processing of large embossing metal roller two different ps laser systems have been integrated into a cylinder engraving machine. One of the ps lasers has an average power of 80W while the other has 300W. With this high power ps laser fluencies of up to 30 J/cm2 at pulse repetition rates in the multi MHz range have been achieved. Different materials (Cu, Ni, Al, steel) have been explored for parameters like ablation rate per pulse, ablation geometry, surface roughness, influence of pulse overlap and number of loops. An enhanced ablation quality and an effective ablation rate of 4mm3/min have been achieved by using different scanning systems and an optimized processing strategy. The max. achieved volume rate is 20mm3/min.

  1. 78 FR 29361 - Winchendon Hydroelectric LLC; Notice of Application Accepted for Filing, Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... Energy Regulatory Commission Winchendon Hydroelectric LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric.... Applicant: Winchendon Hydroelectric LLC. e. Name of Project: Hunts Pond Dam Hydroelectric Project. f...

  2. Hiilangaay Hydroelectric Project – Final Report

    SciTech Connect

    Twitchell, Sara; Stimac, Michael; Lang, Lisa; Witwer, Doreen; Jameson, Vincent

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

  3. ORIGINAL 1912 STATION POWER TRANSFORMERS IN HIGHTENSION ROOM, SW CORNER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ORIGINAL 1912 STATION POWER TRANSFORMERS IN HIGH-TENSION ROOM, SW CORNER OF THE POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  4. Research on trading patterns of large users' direct power purchase considering consumption of clean energy

    NASA Astrophysics Data System (ADS)

    Guojun, He; Lin, Guo; Zhicheng, Yu; Xiaojun, Zhu; Lei, Wang; Zhiqiang, Zhao

    2017-03-01

    In order to reduce the stochastic volatility of supply and demand, and maintain the electric power system's stability after large scale stochastic renewable energy sources connected to grid, the development and consumption should be promoted by marketing means. Bilateral contract transaction model of large users' direct power purchase conforms to the actual situation of our country. Trading pattern of large users' direct power purchase is analyzed in this paper, characteristics of each power generation are summed up, and centralized matching mode is mainly introduced. Through the establishment of power generation enterprises' priority evaluation index system and the analysis of power generation enterprises' priority based on fuzzy clustering, the sorting method of power generation enterprises' priority in trading patterns of large users' direct power purchase is put forward. Suggestions for trading mechanism of large users' direct power purchase are offered by this method, which is good for expand the promotion of large users' direct power purchase further.

  5. 1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL SPILLWAY AT LEFT CENTER, VIEW EAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  6. 3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  7. Big Creek Hydroelectric System, East & West Transmission Line, 241mile ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Big Creek Hydroelectric System, East & West Transmission Line, 241-mile transmission corridor extending between the Big Creek Hydroelectric System in the Sierra National Forest in Fresno County and the Eagle Rock Substation in Los Angeles, California, Visalia, Tulare County, CA

  8. 1. GENERAL VIEW OF SHOSHONE HYDROELECTRIC PLANT IN GLENWOOD CANYON, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. GENERAL VIEW OF SHOSHONE HYDROELECTRIC PLANT IN GLENWOOD CANYON, VIEW TO THE NORTHEAST ALONG U.S. 6 AND THE COLORADO RIVER. - Shoshone Hydroelectric Plant Complex, 60111 U.S. Highway 6, Garfield County, CO

  9. 5. VIEW NORTH OF EARTHEN DIKE WITH HYDROELECTRIC GENERATING FACILITY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VIEW NORTH OF EARTHEN DIKE WITH HYDROELECTRIC GENERATING FACILITY TO LEFT - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  10. 15. VIEW SOUTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE PIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW SOUTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE PIT TO RIGHT AND POWERHOUSE TO LEFT - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  11. INTAKE AND DAM #3; FACING NORTHEAST Shoshone Falls Hydroelectric ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTAKE AND DAM #3; FACING NORTHEAST - Shoshone Falls Hydroelectric Project, Reservoir and Dam Complex, North Bank of Snake River, extreme Eastern end of the Shoshone Falls Hydroelectric Project, Tipperary Corner, Jerome County, ID

  12. DETAIL OF SPILLWAY GATES; FACING NORTHEAST Shoshone Falls Hydroelectric ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL OF SPILLWAY GATES; FACING NORTHEAST - Shoshone Falls Hydroelectric Project, Reservoir and Dam Complex, North Bank of Snake River, extreme Eastern end of the Shoshone Falls Hydroelectric Project, Tipperary Corner, Jerome County, ID

  13. INTAKE, VERTICAL VIEW; FACING EAST Shoshone Falls Hydroelectric Project, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTAKE, VERTICAL VIEW; FACING EAST - Shoshone Falls Hydroelectric Project, Intake, North Bank of Snake River, immediately West/Northwest of the Shoshone Falls Hydroelectric Project Dam No. 1, Tipperary Corner, Jerome County, ID

  14. Methane and CO2 emissions from China's hydroelectric reservoirs: a new quantitative synthesis.

    PubMed

    Li, Siyue; Zhang, Quanfa; Bush, Richard T; Sullivan, Leigh A

    2015-04-01

    Controversy surrounds the green credentials of hydroelectricity because of the potentially large emission of greenhouse gases (GHG) from associated reservoirs. However, limited and patchy data particularly for China is constraining the current global assessment of GHG releases from hydroelectric reservoirs. This study provides the first evaluation of the CO2 and CH4 emissions from China's hydroelectric reservoirs by considering the reservoir water surface and drawdown areas, and downstream sources (including spillways and turbines, as well as river downstream). The total emission of 29.6 Tg CO2/year and 0.47 Tg CH4/year from hydroelectric reservoirs in China, expressed as CO2 equivalents (eq), corresponds to 45.6 Tg CO2eq/year, which is 2-fold higher than the current GHG emission (ca. 23 Tg CO2eq/year) from global temperate hydropower reservoirs. China's average emission of 70 g CO2eq/kWh from hydropower amounts to 7% of the emissions from coal-fired plant alternatives. China's hydroelectric reservoirs thus currently mitigate GHG emission when compared to the main alternative source of electricity with potentially far great reductions in GHG emissions and benefits possible through relatively minor changes to reservoir management and design. On average, the sum of drawdown and downstream emission including river reaches below dams and turbines, which is overlooked by most studies, represents the equivalent of 42% of the CO2 and 92% of CH4 that emit from hydroelectric reservoirs in China. Main drivers on GHG emission rates are summarized and highlight that water depth and stratification control CH4 flux, and CO2 flux shows significant negative relationships with pH, DO, and Chl-a. Based on our finding, a substantial revision of the global carbon emissions from hydroelectric reservoirs is warranted.

  15. Feasibility study of the Ambodiroka Hydroelectric Project. Volume 1. Export trade information

    SciTech Connect

    Not Available

    1988-04-01

    The study, conducted by Harza Engineering Company, was funded by the U.S. Trade and Development Agency on behalf of the Ministry of Industry, Energy, and Mines, of Madagascar. The main purpose of the report is to assess the feasibility of developing a reduced-scaled hydroelectric installation at Ambodiroka, taking into account new electricity demand forecasts and other factors. The study is divided into the following sections: (1) The Ambodiroka Hydroelectric Project; (2) Electric Power Demand and Supply; (3) Economic Justification; (4) Financial Analysis; (5) Project Implementation; (6) Studies Leading to the Selected Project; (7) Appendices. This is volume 1 of 2.

  16. Feasibility study of the Ambodiroka Hydroelectric Project. Volume 2. Export trade information

    SciTech Connect

    Not Available

    1988-04-01

    The study, conducted by Harza Engineering Company, was funded by the U.S. Trade and Development Agency on behalf of the Ministry of Industry, Energy, and Mines, of Madagascar. The main purpose of the report is to assess the feasibility of developing a reduced-scaled hydroelectric installation at Ambodiroka, taking into account new electricity demand forecasts and other factors. The study is divided into the following sections: (1) The Ambodiroka Hydroelectric Project; (2) Electric Power Demand and Supply; (3) Economic Justification; (4) Financial Analysis; (5) Project Implementation; (6) Studies Leading to the Selected Project; (7) Appendices. This is volume 2 of 2- it contains the appendices.

  17. Satellite observations of large power plants and megacities from GOSAT

    NASA Astrophysics Data System (ADS)

    Oda, Tom; Maksyutov, Shamil; Boesch, Hartmut; Butz, Andre; Ganshin, Alexander; Guerlet, Sandrine; Parker, Robert; O'Dell, Chris; Oshchepkov, Sergey; Yoshida, Yukio; Zhuravlev, Ruslan; Yokota, Tatsuya

    2013-04-01

    Fossil fuel CO2 emissions are a major source of CO2 to the global carbon cycle over decadal time scales and international efforts to curb those missions are required for mitigating climate change. Although emissions from nations are estimated and reported to help monitor their compliance of emission reductions, we still lack an objective method to monitor emissions directly. Future carbon-observing space missions are thus expected to provide an independent tool for directly measuring emissions. We proposed and have implemented satellite observations specifically over intense large point sources (LPS), including large fossil-fueled power plants and megacities, worldwide (N > 300) using the Japanese Greenhouse Gases Observing SATelllite (GOSAT). Our target LPS sites have been occasionally included in the observation schedule of GOSAT and the measurements are made using the target observation mode. This proposal was officially accepted by the GOSAT project office and we have attempted to use these data to detect signatures of man-made greenhouse gas emissions. We have submitted our locations of interest on a monthly basis two month prior to observation. We calculated the X_CO2 concentration enhancement due to the LPS emissions. We analyzed GOSAT X_CO2 retrievals from four research groups (five products total): the National Institute for Environmental Studies (NIES) (both the NIES standard Level 2 and NIES-PPDF products), the NASA Atmospheric CO2 from Space (ACOS) team (ACOS Level 2 product), the Netherlands Institute for Space Research (SRON)/Karlsruhe Institute of Technology, Germany (RemoTeC), and the University of Leicester, UK (Full-Physics CO2 retrieval dataset). Although we obtained fewer retrieved soundings relative to what we requested (probably due to geophysical difficulties in the retrievals), we did obtain statistically significant enhancements at some LPS sites where weather condition were ideal for viewing. We also implemented simulations of enhanced X

  18. Hydroelectric structures studies using 3-dimensional methods

    SciTech Connect

    Harrell, T.R.; Jones, G.V.; Toner, C.K. )

    1989-01-01

    Deterioration and degradation of aged, hydroelectric project structures can significantly affect the operation and safety of a project. In many cases, hydroelectric headworks (in particular) have complicated geometrical configurations, loading patterns and hence, stress conditions. An accurate study of such structures can be performed using 3-dimensional computer models. 3-D computer models can be used for both stability evaluation and for finite element stress analysis. Computer aided engineering processes facilitate the use of 3-D methods in both pre-processing and post-processing of data. Two actual project examples are used to emphasize the authors' points.

  19. Legal obstacles and incentives to the development of small scale hydroelectric projects in Massachusetts

    SciTech Connect

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small scale hydroelectric energy at the state level are discussed. The discussion is designed to aid the developer in the determination of which permits, licenses, and laws of the state must be secured or complied with for the development of a project. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Specific sections that follow are: Massachusetts Water Law; Licensing, Permitting, and Review Procedures; Indirect Considerations (by departments); Department of Public Utilities Regulation of Privately Owned Electric Utilities; Massachusetts Municipal Wholesale Electric Company; Miscellaneous Legal Issues Relating to Low-Head Hydroelectric Power; and Financial Considerations.

  20. Pattern of injuries in a hydro-electric project.

    PubMed

    Malhotra, P; Dhar, S; Dogra, S; Kaul, S; Raina, R K

    1995-05-01

    A study of work-related injuries at a hydro-electric project site (May 1991-April 1992) was undertaken to determine the incidence and pattern of the injuries out of a total number of 119 injuries in the year. A significant proportion of these were orthopaedic in nature and the commonest site of injury was limbs (both upper and lower limbs) like auto-amputations and head injuries. A large proportion of these accidents (24.37%) resulted in permanent disability likely to interfere in the normal activities or locomotion of those injured.

  1. Dams in the Amazon: Belo Monte and Brazil's Hydroelectric Development of the Xingu River Basin

    NASA Astrophysics Data System (ADS)

    Fearnside, Phillip M.

    2006-07-01

    Hydroelectric dams represent major investments and major sources of environmental and social impacts. Powerful forces surround the decision-making process on public investments in the various options for the generation and conservation of electricity. Brazil’s proposed Belo Monte Dam (formerly Kararaô) and its upstream counterpart, the Altamira Dam (better known by its former name of Babaquara) are at the center of controversies on the decision-making process for major infrastructure projects in Amazonia. The Belo Monte Dam by itself would have a small reservoir area (440 km2) and large installed capacity (11, 181.3 MW), but the Altamira/Babaquara Dam that would regulate the flow of the Xingu River (thereby increasing power generation at Belo Monte) would flood a vast area (6140 km2). The great impact of dams provides a powerful reason for Brazil to reassess its current policies that allocate large amounts of energy in the country’s national grid to subsidized aluminum smelting for export. The case of Belo Monte and the five additional dams planned upstream (including the Altamira/Babaquara Dam) indicate the need for Brazil to reform its environmental assessment and licensing system to include the impacts of multiple interdependent projects.

  2. Dams in the Amazon: Belo Monte and Brazil's hydroelectric development of the Xingu River Basin.

    PubMed

    Fearnside, Phillip M

    2006-07-01

    Hydroelectric dams represent major investments and major sources of environmental and social impacts. Powerful forces surround the decision-making process on public investments in the various options for the generation and conservation of electricity. Brazil's proposed Belo Monte Dam (formerly Kararaô) and its upstream counterpart, the Altamira Dam (better known by its former name of Babaquara) are at the center of controversies on the decision-making process for major infrastructure projects in Amazonia. The Belo Monte Dam by itself would have a small reservoir area (440 km2) and large installed capacity (11, 181.3 MW), but the Altamira/Babaquara Dam that would regulate the flow of the Xingu River (thereby increasing power generation at Belo Monte) would flood a vast area (6140 km2). The great impact of dams provides a powerful reason for Brazil to reassess its current policies that allocate large amounts of energy in the country's national grid to subsidized aluminum smelting for export. The case of Belo Monte and the five additional dams planned upstream (including the Altamira/Babaquara Dam) indicate the need for Brazil to reform its environmental assessment and licensing system to include the impacts of multiple interdependent projects.

  3. 14 CFR 91.1037 - Large transport category airplanes: Turbine engine powered; Limitations; Destination and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....1037 Large transport category airplanes: Turbine engine powered; Limitations; Destination and alternate airports. (a) No program manager or any other person may permit a turbine engine powered large transport... and terrain. (c) A program manager or other person flying a turbine engine powered large transport...

  4. 14 CFR 135.385 - Large transport category airplanes: Turbine engine powered: Landing limitations: Destination...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....385 Large transport category airplanes: Turbine engine powered: Landing limitations: Destination airports. (a) No person operating a turbine engine powered large transport category airplane may take off... this section, no person operating a turbine engine powered large transport category airplane may take...

  5. 14 CFR 135.385 - Large transport category airplanes: Turbine engine powered: Landing limitations: Destination...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....385 Large transport category airplanes: Turbine engine powered: Landing limitations: Destination airports. (a) No person operating a turbine engine powered large transport category airplane may take off... this section, no person operating a turbine engine powered large transport category airplane may take...

  6. 14 CFR 91.1037 - Large transport category airplanes: Turbine engine powered; Limitations; Destination and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....1037 Large transport category airplanes: Turbine engine powered; Limitations; Destination and alternate airports. (a) No program manager or any other person may permit a turbine engine powered large transport... and terrain. (c) A program manager or other person flying a turbine engine powered large transport...

  7. 76 FR 76146 - Large Power Transformers From the Republic of Korea: Postponement of Preliminary Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... International Trade Administration Large Power Transformers From the Republic of Korea: Postponement of... transformers from the Republic of Korea (Korea). See Large Power Transformers from the Republic of Korea... petitioners to the Department, entitled ``Large Power Transformers from the Republic of Korea--...

  8. Short-Term Power Fluctuations of Large Wind Power Plants: Preprint

    SciTech Connect

    Wan, Y.; Bucaneg, D.

    2002-01-01

    With electric utilities and other power providers showing increased interest in wind power and with growing penetration of wind capacity into the market, questions about how wind power fluctuations affect power system operations and about wind power's ancillary services requirements are receiving lots of attention. The project's purpose is to acquire actual, long-term wind power output data for analyzing wind power fluctuations, frequency distribution of the changes, the effects of spatial diversity, and wind power ancillary services.

  9. River recreation management opportunities in hydroelectric relicensing

    Treesearch

    James R. Bernier

    1992-01-01

    Between now and 1993, more than 200 existing hydroelectric projects will come up for relicensing before FERC, the Federal Energy Regulatory Commission. This provides a rare opportunity for agencies and individuals to markedly influence the ecological and recreational balance of these projects. This paper presents an overview of the relicensing process, describes some...

  10. Security, protection, and control of power systems with large-scale wind power penetration

    NASA Astrophysics Data System (ADS)

    Acharya, Naresh

    As the number of wind generation facilities in the utility system is fast increasing, many issues associated with their integration into the power system are beginning to emerge. Of the various issues, this dissertation deals with the development of new concepts and computational methods to handle the transmission issues and voltage issues caused by large-scale integration of wind turbines. This dissertation also formulates a probabilistic framework for the steady-state security assessment of wind power incorporating the forecast uncertainty and correlation. Transmission issues are mainly related to the overloading of transmission lines, when all the wind power generated cannot be delivered in full due to prior outage conditions. To deal with this problem, a method to curtail the wind turbine outputs through Energy Management System facilities in the on-line operational environment is proposed. The proposed method, which is based on linear optimization, sends the calculated control signals via the Supervisory Control and Data Acquisition system to wind farm controllers. The necessary ramping of the wind farm outputs is implemented either by the appropriate blade pitch angle control at the turbine level or by switching a certain number of turbines. The curtailment strategy is tested with an equivalent system model of MidAmerican Energy Company. The results show that the line overload in high wind areas can be alleviated by controlling the outputs of the wind farms step-by-step over an allowable period of time. A low voltage event during a system fault can cause a large number of wind turbines to trip, depending on voltages at the wind turbine terminals during the fault and the under-voltage protection setting of wind turbines. As a result, an N-1 contingency may evolve into an N-(K+1) contingency, where K is the number of wind farms tripped due to low voltage conditions. Losing a large amount of wind power following a line contingency might lead to system

  11. Large CFB power plant design and operating experience: Texas-New Mexico Power Company 150 MWe (net) CFB power plant

    SciTech Connect

    Riley, K.; Cleve, K.; Tanca, M.

    1995-12-31

    The first unit of the TNP One CFB power plant was successfully put on line by Texas-New Mexico Power Company (TNP) in Robertson County, Texas, US in 1990. Unit 2 came on line one year later. This grassroots plant fires Texas lignite. The two identical CFB units were each designed for 150 MWe net electrical generation. The units have operated at 155 MWe net for extended periods of time without modifications. The boilers have additional capacity but are limited by the balance of plant. The TNP One plant was awarded the Power Plant of the Year Award by Power magazine in 1991 advancing CFB technology in large generating facilities. The plant was designed for maximum fuel flexibility with guaranteed full load operation on either Texas lignite, western coal or natural gas. The plant has fired the following fuels, to date: lignite (base fuel), natural gas (0--100% with lignite), delayed petroleum coke (0--100% with lignite), plant generated waste oils (small amounts), oil filter fluff (small amounts) and a waste product of pelletized reflective tape. Future testing is planned to test burn shredded tires. While firing all fuels, the plant could attain full load and meet all environmentally permitted emissions without any boiler modifications or compromises in boiler efficiency. This high flexibility of the plant can be attributed to the two large fluidized bed heat exchangers (FBHEs) for steam temperature and combustor temperature control. The facility is a mine mouth operation burning the local Texas lignite. The delayed petroleum cokes fired originated from various supply sources from the Texas/Louisiana area.

  12. Medium power voltage multipliers with a large number of stages

    NASA Technical Reports Server (NTRS)

    Harrigill, W. T.; Myers, I. T.

    1978-01-01

    Voltage multiplier techniques are extended at medium power levels to larger multiplication ratios. A series of dc-dc converters were built, with from 20 to 45 stages and with power levels up to 100 watts. Maximum output voltages were about 10,000 volts.

  13. Review of Pacific Northwest Laboratory research on aquatic effects of hydroelectric generation and assessment of research needs

    SciTech Connect

    Fickeisen, D.H.; Becker, C.D.; Neitzel, D.A.

    1981-05-01

    This report is an overview of Pacific Northwest Laboratory's (PNL) research on how hydroelectric generation affects aquatic biota and environments. The major accomplishments of this research are described, and additional work needed to permit optimal use of available data is identified. The research goals are to: (1) identify impacts of hydroelectric generation, (2) provide guidance in allocating scarce water resources, and (3) develop techniques to avoid or reduce the impacts on aquatic communities or to compensate for unavoidable impacts. Through laboratory and field experiments, an understanding is being developed of the generic impacts of hydrogeneration. Because PNL is located near the Columbia River, which is extensively developed for hydroelectric generation, it is used as a natural laboratory for studying a large-scale operating system. Although the impacts studied result from a particular system of dams and operating procedures and occur within a specific ecosystem, the results of these studies have application at hydroelectric generating facilities throughout the United States.

  14. Installation of a Marine Thruster as a Hydroelectric Turbine at Eagle Creek National Fish Hatchery : Final Report.

    SciTech Connect

    United States. Bonneville Power Administration. Division of Resource Engineering

    1986-11-15

    A 70kW hydroelectric plant utilizing a marine thruster and an induction generator was commissioned on May 15, 1985 at the Eagle Creek National Fish Hatchery near Estacada, OR as a Bonneville Power Administration (BPA) demonstration project. The marine thruster, normally used to maneuver large ships, was run ''backwards'' to produce electricity. The plant was completed and tested by J.F. Sato and Associates, Inc. (JFSA). The marine thruster was seen as a method for reducing the capital cost of small, low head hydro projects by utilizing readily available, off-the-shelf equipment. The owner of the hatchery, the US Fish and Wildlife Service (USF and WS), has an active energy conservation program and looked hopefully at a match of inexpensive hydroelectric technology and an available site at the hatchery to offset their annual 650,000-kWh usage. The preliminary results of the testing program indicated a water-to-wire efficiency in the mid-70 percent range and a turbine efficiency in the low-80 percent range. Total gross head was 19 feet with a maximum flow of 65 cubic feet per second. The unit was tested at four different speeds by varying sheave diameters on the drive system. Flow measurements were taken using the Venturi principle at a reducer in the penstock. A downstream weir was constructed to correct low tailwater conditions. 7 refs., 44 figs., 11 tabs.

  15. Hydroelectric System Response to Part Load Vortex Rope Excitation

    NASA Astrophysics Data System (ADS)

    Alligné, S.; Nicolet, C.; Bégum, A.; Landry, C.; Gomes, J.; Avellan, F.

    2016-11-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope on the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of v = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed to analyse potential interactions between hydraulic excitation sources and electrical components.

  16. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase 1, Volume Two (B), Clark Fork River Projects, Cabinet Gorge and Noxon Rapids Dams, Operator, Washington Water Power Company.

    SciTech Connect

    Wood, Marilyn

    1984-06-01

    This report documents best available information concerning the wildlife species impacted and the degree of the impact. A target species list was developed to focus the impact assessment and to direct mitigation efforts. Many non-target species also incurred impacts but are not discussed in this report. All wildlife habitats inundated by the two reservoirs are represented by the target species. It was assumed the numerous non-target species also affected will be benefited by the mitigation measures adopted for the target species. Impacts addressed are limited to those directly attributable to the loss of habitat and displacement of wildlife populations due to the construction and operation of the two hydroelectric projects. Secondary impacts, such as the relocation of railroads and highways, and the increase of the human population, were not considered. In some cases, both positive and negative impacts were assessed; and the overall net effect was reported. The loss/gain estimates reported represent impacts considered to have occurred during one point in time except where otherwise noted. When possible, quantitative estimates were developed based on historical information from the area or on data from similar areas. Qualitative loss estimates of low, moderate, or high with supporting rationale were assessed for each species or species group.

  17. Benefits of fish passage and protection measures at hydroelectric projects

    SciTech Connect

    Cada, G.F.; Jones, D.W.

    1993-06-01

    The US Department of Energy`s Hydropower Program is engaged in a multi-year study of the costs and benefits of environmental mitigation measures at nonfederal hydroelectric power plants. An initial report (Volume 1) reviewed and surveyed the status of mitigation methods for fish passage, instream flows, and water quality; this paper focuses on the fish passage/protection aspects of the study. Fish ladders were found to be the most common means of passing fish upstream; elevators/lifts were less common, but their use appears to be increasing. A variety of mitigative measures is employed to prevent fish from being drawn into turbine intakes, including spill flows, narrow-mesh intake screens, angled bar racks, and lightor sound-based guidance measures. Performance monitoring and detailed, quantifiable performance criteria were frequently lacking at non-federal hydroelectric projects. Volume 2 considers the benefits and costs of fish passage and protection measures, as illustrated by case studies for which performance monitoring has been conducted. The report estimates the effectiveness of particular measures, the consequent impacts on the fish populations that are being maintained or restored, and the resulting use and non-use values of the maintained or restored fish populations.

  18. Future large space systems opportunities: A case for space-to-space power?. [spacecraft power supplies microwave and laser transmission

    NASA Technical Reports Server (NTRS)

    Garrett, L. B.; Hook, W. R.

    1978-01-01

    Applications and options for beaming power to near-earth space users from a central space power platform are examined. The cost effectiveness of on-board versus remote power transfer is examined for orbital transfer propulsion systems. Performance characteristics are projected for advanced power generation, transmission, and receiver systems for the 1990's. Major technological development needs are identified with particular emphasis on large space systems technology.

  19. Design considerations for large space electric power systems

    NASA Technical Reports Server (NTRS)

    Renz, D. D.; Finke, R. C.; Stevens, N. J.; Triner, J. E.; Hansen, I. G.

    1983-01-01

    As power levels of spacecraft rise to the 50 to 100 kW range, it becomes apparent that low voltage (28 V) dc power distribution and management systems will not operate efficiently at these higher power levels. The concept of transforming a solar array voltage at 150 V dc into a 1000 V ac distribution system operating at 20 kHz is examined. The transformation is accomplished with series-resonant inverter by using a rotary transformer to isolate the solar array from the spacecraft. The power can then be distributed in any desired method such as three phase delta to delta. The distribution voltage can be easily transformed to any desired load voltage and operating frequency. The reasons for the voltage limitations on the solar array due to plasma interactions and the many advantages of a high voltage, high frequency at distribution system are discussed.

  20. 76 FR 49439 - Large Power Transformers From the Republic of Korea: Initiation of Antidumping Duty Investigation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... International Trade Administration Large Power Transformers From the Republic of Korea: Initiation of... power transformers (``large power transformers'') from the Republic of Korea (``Korea''), filed in... Transformers from the Republic of Korea, filed on July 14, 2011 (``the Petition''). On July 20, 2011,...

  1. Large scale power suppression in a multifield landscape

    SciTech Connect

    Blanco-Pillado, Jose J.; Frazer, Jonathan; Sousa, Kepa

    2015-08-01

    Power suppression of the cosmic microwave background on the largest observable scales could provide valuable clues about the particle physics underlying inflation. Here we consider the prospect of power suppression in the context of the multifield landscape. Based on the assumption that our observable universe emerges from a tunnelling event and that the relevant features originate purely from inflationary dynamics, we find that the power spectrum not only contains information on single-field dynamics, but also places strong constraints on all scalar fields present in the theory. We find that the simplest single-field models giving rise to power suppression do not generalise to multifield models in a straightforward way, as the resulting superhorizon evolution of the curvature perturbation tends to erase any power suppression present at horizon crossing. On the other hand, multifield effects do present a means of generating power suppression which to our knowledge has so far not been considered. We propose a mechanism to illustrate this, which we dub flume inflation.

  2. High voltage-high power components for large space power distribution systems

    NASA Technical Reports Server (NTRS)

    Renz, D. D.

    1984-01-01

    Space power components including a family of bipolar power switching transistors, fast switching power diodes, heat pipe cooled high frequency transformers and inductors, high frequency conduction cooled transformers, high power-high frequency capacitors, remote power controllers and rotary power transfer devices were developed. Many of these components such as the power switching transistors, power diodes and the high frequency capacitor are commercially available. All the other components were developed to the prototype level. The dc/dc series resonant converters were built to the 25 kW level.

  3. Growth of Power-Free Languages over Large Alphabets

    NASA Astrophysics Data System (ADS)

    Shur, Arseny M.

    We study growth properties of power-free languages over finite alphabets. We consider the function α(k,β) whose values are the exponential growth rates of β-power-free languages over k-letter alphabets and clarify its asymptotic behaviour. Namely, we suggest the laws of the asymptotic behaviour of this function when k tends to infinity and prove some of them as theorems. In particular, we obtain asymptotic formulas for α(k,β) for the case β ≥ 2.

  4. 14 CFR 135.385 - Large transport category airplanes: Turbine engine powered: Landing limitations: Destination...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Large transport category airplanes: Turbine....385 Large transport category airplanes: Turbine engine powered: Landing limitations: Destination airports. (a) No person operating a turbine engine powered large transport category airplane may take...

  5. 14 CFR 135.385 - Large transport category airplanes: Turbine engine powered: Landing limitations: Destination...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Large transport category airplanes: Turbine....385 Large transport category airplanes: Turbine engine powered: Landing limitations: Destination airports. (a) No person operating a turbine engine powered large transport category airplane may take...

  6. 14 CFR 91.1037 - Large transport category airplanes: Turbine engine powered; Limitations; Destination and...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Large transport category airplanes: Turbine....1037 Large transport category airplanes: Turbine engine powered; Limitations; Destination and alternate airports. (a) No program manager or any other person may permit a turbine engine powered large...

  7. 14 CFR 135.385 - Large transport category airplanes: Turbine engine powered: Landing limitations: Destination...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Large transport category airplanes: Turbine....385 Large transport category airplanes: Turbine engine powered: Landing limitations: Destination airports. (a) No person operating a turbine engine powered large transport category airplane may take...

  8. 14 CFR 91.1037 - Large transport category airplanes: Turbine engine powered; Limitations; Destination and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Large transport category airplanes: Turbine....1037 Large transport category airplanes: Turbine engine powered; Limitations; Destination and alternate airports. (a) No program manager or any other person may permit a turbine engine powered large...

  9. 14 CFR 91.1037 - Large transport category airplanes: Turbine engine powered; Limitations; Destination and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Large transport category airplanes: Turbine....1037 Large transport category airplanes: Turbine engine powered; Limitations; Destination and alternate airports. (a) No program manager or any other person may permit a turbine engine powered large...

  10. 14 CFR 135.387 - Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate airports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Large transport category airplanes: Turbine....387 Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate... alternate airport for a turbine engine powered large transport category airplane unless (based on...

  11. 14 CFR 135.387 - Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate airports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Large transport category airplanes: Turbine....387 Large transport category airplanes: Turbine engine powered: Landing limitations: Alternate... alternate airport for a turbine engine powered large transport category airplane unless (based on...

  12. 76 FR 65212 - Caterpillar, Inc., Large Power Systems Division, Including On-Site Leased Workers From Gray...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-20

    ... Employment and Training Administration Caterpillar, Inc., Large Power Systems Division, Including On- Site... Adjustment Assistance on November 2, 2009, applicable to Caterpillar, Inc., Large Power Systems Division... Caterpillar, Inc., Large Power Systems Division. The Department has determined that these workers...

  13. Mercury accumulation in bats near hydroelectric reservoirs in Peninsular Malaysia.

    PubMed

    Syaripuddin, Khairunnisa; Kumar, Anjali; Sing, Kong-Wah; Halim, Muhammad-Rasul Abdullah; Nursyereen, Muhammad-Nasir; Wilson, John-James

    2014-09-01

    In large man-made reservoirs such as those resulting from hydroelectric dam construction, bacteria transform the relatively harmless inorganic mercury naturally present in soil and the submerged plant matter into toxic methylmercury. Methylmercury then enters food webs and can accumulate in organisms at higher trophic levels. Bats feeding on insects emerging from aquatic systems can show accumulation of mercury consumed through their insect prey. In this study, we investigated whether the concentration of mercury in the fur of insectivorous bat species was significantly higher than that in the fur of frugivorous bat species, sampled near hydroelectric reservoirs in Peninsular Malaysia. Bats were sampled at Temenggor Lake and Kenyir Lake and fur samples from the most abundant genera of the two feeding guilds-insectivorous (Hipposideros and Rhinolophus) and frugivorous (Cynopterus and Megaerops) were collected for mercury analysis. We found significantly higher concentrations of total mercury in the fur of insectivorous bats. Mercury concentrations also differed significantly between insectivorous bats sampled at the two sites, with bats from Kenyir Lake, the younger reservoir, showing higher mercury concentrations, and between the insectivorous genera, with Hipposideros bats showing higher mercury concentrations. Ten bats (H. cf. larvatus) sampled at Kenyir Lake had mercury concentrations approaching or exceeding 10 mg/kg, which is the threshold at which detrimental effects occur in humans, bats and mice.

  14. Non-intrusive measurement techniques for hydroelectric applicants

    SciTech Connect

    Birch, R.; Lemon, D.

    1995-12-31

    Non-intrusive acoustic methods for measuring flows, originally developed for oceanographic applications, are being used in and around hydroelectric dams. The acoustic methods can be categorized as either back-scattering or forward-scattering. The first, using the back-scattered signal, measures the Doppler shift of the returning echo to determine the along-beam component of flow. These instruments are generally called Acoustic Doppler Current Profilers (ADCP). Three beam solutions allow computation of the velocity components. Time gating the return provides a velocity profile with bin segments as small as 0.25 in. In areas of strong magnetic deviation, often the case beside large dams, a gyrocompass can be used to provide directional orientation. The velocity data can also be used to quickly compute river or channel discharge. Typical applications and several case studies are presented. The second acoustic technique is based on a forward-scattering phenomenon known as scintillation. This technique has been used on the Fraser River to monitor flows, and properties of the signal have recently been correlated with the biomass of upstream-migrating salmon. Acoustic scintillation flow measurements are well suited to applications with limited space in the along-flow direction. Applications to hydroelectric dams include turbine intake flow measurements, and a system has been developed to measure flow along fish diversion screens.

  15. Gated Si nanowires for large thermoelectric power factors

    SciTech Connect

    Neophytou, Neophytos; Kosina, Hans

    2014-08-18

    We investigate the effect of electrostatic gating on the thermoelectric power factor of p-type Si nanowires (NWs) of up to 20 nm in diameter in the [100], [110], and [111] crystallographic transport orientations. We use atomistic tight-binding simulations for the calculation of the NW electronic structure, coupled to linearized Boltzmann transport equation for the calculation of the thermoelectric coefficients. We show that gated NW structures can provide ∼5× larger thermoelectric power factor compared to doped channels, attributed to their high hole phonon-limited mobility, as well as gating induced bandstructure modifications which further improve mobility. Despite the fact that gating shifts the charge carriers near the NW surface, surface roughness scattering is not strong enough to degrade the transport properties of the accumulated hole layer. The highest power factor is achieved for the [111] NW, followed by the [110], and finally by the [100] NW. As the NW diameter increases, the advantage of the gated channel is reduced. We show, however, that even at 20 nm diameters (the largest ones that we were able to simulate), a ∼3× higher power factor for gated channels is observed. Our simulations suggest that the advantage of gating could still be present in NWs with diameters of up to ∼40 nm.

  16. Achievable flatness in a large microwave power antenna study

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Achievable flatness for the microwave power transmission system antenna array was determined. Two configurations were analyzed in detail and evaluated as to their net potential misalignment. Manufacturing, joint slack, assembly, alignment and environmental aspects were considered. Approaches to each aspect were analyzed to minimize their contributions to distortions.

  17. Arch dam of the Khudoni hydroelectric station

    SciTech Connect

    Dzhakeli, P.A.; Kobakhidze, V.D.; Koridze, G.I.

    1987-01-01

    This paper discusses the Khudoni hydroelectric station. The selection of the type and site of the dam are described. A plan of the hydro development with the chosen concrete arch dam is shown. Engineering-geologic and seismotectonic conditions of the chosen site are examined. Two types of design were examined for the arch dam, and they are described. Structural elements of the dam are discussed as is reinforcement, stress-strain state, underground contour and outlet works.

  18. Aging assessment of large electric motors in nuclear power plants

    SciTech Connect

    Villaran, M.; Subudhi, M.

    1996-03-01

    Large electric motors serve as the prime movers to drive high capacity pumps, fans, compressors, and generators in a variety of nuclear plant systems. This study examined the stressors that cause degradation and aging in large electric motors operating in various plant locations and environments. The operating history of these machines in nuclear plant service was studied by review and analysis of failure reports in the NPRDS and LER databases. This was supplemented by a review of motor designs, and their nuclear and balance of plant applications, in order to characterize the failure mechanisms that cause degradation, aging, and failure in large electric motors. A generic failure modes and effects analysis for large squirrel cage induction motors was performed to identify the degradation and aging mechanisms affecting various components of these large motors, the failure modes that result, and their effects upon the function of the motor. The effects of large motor failures upon the systems in which they are operating, and on the plant as a whole, were analyzed from failure reports in the databases. The effectiveness of the industry`s large motor maintenance programs was assessed based upon the failure reports in the databases and reviews of plant maintenance procedures and programs.

  19. Optical fiber instrumentation of a high power generator and turbine

    NASA Astrophysics Data System (ADS)

    da Silva, Erlon Vagner; Dreyer, Uilian José; de Morais Sousa, Kleiton; Babinski, Valderi Junot; Somenzi, Jonas; Mezzadri, Felipe; de Lourenço Junior, Ivo; Martelli, Cicero; Cardozo da Silva, Jean Carlos

    2013-05-01

    The instrumentation of a high power generator and its complementary systems including the turbine bearings is presented and discussed. The generator consists of a 175MW hydroelectric generator installed in the Salto Osório power plant in the southern region of Brazil. Results show good agreement with the already existing instrumentation and demonstrate the technology potential for a full optical fiber sensing system to monitor these large machines.

  20. Culinary and pressure irrigation water system hydroelectric generation

    SciTech Connect

    Christiansen, Cory

    2016-01-29

    Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reduce pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.

  1. Greenhouse gas emissions from Brazil’s Amazonian hydroelectric dams

    NASA Astrophysics Data System (ADS)

    Fearnside, Philip M.

    2016-01-01

    Tropical dams are often falsely portrayed as ‘clean’ emissions-free energy sources. The letter by de Faria et al (2015 Environ. Res. Lett. 10 124019) adds to evidence questioning this myth. Calculations are made for 18 dams that are planned or under construction in Brazilian Amazonia and show that emissions from storage hydroelectric dams would exceed those from electricity generation based on fossil fuels. Fossil fuels need not be the alternative, because Brazil has vast potential for wind and solar power as well as opportunities for energy conservation. Because dam-building is rapidly shifting to humid tropical areas, where emissions are higher than in other climatic zones, the impact of these emissions needs to be given proper weight in energy-policy decisions.

  2. Low-Power Architectures for Large Radio Astronomy Correlators

    NASA Technical Reports Server (NTRS)

    D'Addario, Larry R.

    2011-01-01

    The architecture of a cross-correlator for a synthesis radio telescope with N greater than 1000 antennas is studied with the objective of minimizing power consumption. It is found that the optimum architecture minimizes memory operations, and this implies preference for a matrix structure over a pipeline structure and avoiding the use of memory banks as accumulation registers when sharing multiply-accumulators among baselines. A straw-man design for N = 2000 and bandwidth of 1 GHz, based on ASICs fabricated in a 90 nm CMOS process, is presented. The cross-correlator proper (excluding per-antenna processing) is estimated to consume less than 35 kW.

  3. Low-Power Architectures for Large Radio Astronomy Correlators

    NASA Technical Reports Server (NTRS)

    D'Addario, Larry R.

    2011-01-01

    The architecture of a cross-correlator for a synthesis radio telescope with N greater than 1000 antennas is studied with the objective of minimizing power consumption. It is found that the optimum architecture minimizes memory operations, and this implies preference for a matrix structure over a pipeline structure and avoiding the use of memory banks as accumulation registers when sharing multiply-accumulators among baselines. A straw-man design for N = 2000 and bandwidth of 1 GHz, based on ASICs fabricated in a 90 nm CMOS process, is presented. The cross-correlator proper (excluding per-antenna processing) is estimated to consume less than 35 kW.

  4. Large-scale Eucalyptus energy farms and power cogeneration

    Treesearch

    Robert C. Noroña

    1983-01-01

    A thorough evaluation of all factors possibly affecting a large-scale planting of eucalyptus is foremost in determining the cost effectiveness of the planned operation. Seven basic areas of concern must be analyzed:1. Species Selection 2. Site Preparation 3. Planting 4. Weed Control 5....

  5. Jet engine powers large, high-temperature wind tunnel

    NASA Technical Reports Server (NTRS)

    Benham, T. F.; Mulliken, S. R.

    1967-01-01

    Wind tunnel for large component testing uses a jet engine with afterburner to provide high temperatures /1200 degrees to 2000 degrees F/ and controlled high velocity gas. This economical wind tunnel can accommodate parts ten feet by ten feet or larger, and is a useful technique for qualitative information.

  6. Large area solar power heliostat array for OSETI

    NASA Astrophysics Data System (ADS)

    Covault, Corbin E.

    2001-08-01

    Current OSETI programs make use of optical telescopes with light collection areas on the order of 10 square meters or less. The small collection area limits the ultimate sensitivity achievable to low-intensity signals. However, solar power facilities such as the National Solar Thermal Test Facility (NSTTF) provide the potential for a much larger collecting area. The NSTTF is operated at by the Department of Energy at Sandia National Laboratories for research in solar power development and testing. The NSTTF site includes over 200 fully steerable mirrors (called heliostats) each providing 37 square meters of collecting area. This facility is currently being used at night for gamma-ray astronomy. The STACEE experiment makes use of 64 heliostats to detect nanosecond flashes of optical Cherenkov light associated with gamma-ray air showers from the top of the atmosphere. The STACEE experiment has been in operation since 1998 and has already detected gamma-rays from the Crab Nebula. In principle, the STACEE experiment can be operated with minor modifications to detect OSETI signals on the ground at a photon density of less than two optical photons per square meter per pulse. We summarize performance results from the STACEE experiment, and we discuss the sensitivity of a hypothetical future STACEE-OSETI experiment with particular attention to potential sources of background.

  7. Flashover lithium ion source development for large pulsed power accelerators

    SciTech Connect

    Bieg, K.W.; Burns, E.J.T.; Gerber, R.A.; Olsen, J.N.; Lamppa, K.P.

    1985-01-01

    PBFA II, a light-ion pulsed power accelerator intended for inertial confinement fusion (ICF) applications, is currently under construction at Sandia National Laboratories. The accelerator will deliver a 30 MV, 5 MA lithium beam from an Applied-B diode to drive an ICF target. The ion source for this diode will require a thin (approx.1 mm), dense (10 W cm S) anode plasma layer of singly-ionized lithium over an anode area of 10T cmS. One type of source being investigated is the flashover ion source, which generates the anode plasma via vacuum flashover of a lithium-bearing dielectric material. Experiments with a LiF flashover source on the 0.03 TW Nereus accelerator have shown that contaminant ions account for as much as 70% of the extracted ion beam current. To overcome this, we have explored in-diode cleaning of the externally-prepared anode surface by glow discharge cleaning and vacuum baking as well as in-diode preparation of the anode surface by vacuum evaporation of the lithium dielectric. Lithium-bearing dielectric materials which have been investigated include LiF, LiI, LiNO3, and Li3N. These techniques have resulted in a two- to three-fold improvement in the extracted lithium ion purity. As a result, a glow-discharge cleaned LiF flashover source will be used for initial pulsed-power testing on PBFA II.

  8. A logistics model for large space power systems

    NASA Astrophysics Data System (ADS)

    Koelle, H. H.

    Space Power Systems (SPS) have to overcome two hurdles: (1) to find an attractive design, manufacturing and assembly concept and (2) to have available a space transportation system that can provide economical logistic support during the construction and operational phases. An initial system feasibility study, some five years ago, was based on a reference system that used terrestrial resources only and was based partially on electric propulsion systems. The conclusion was: it is feasible but not yet economically competitive with other options. This study is based on terrestrial and extraterrestrial resources and on chemical (LH 2/LOX) propulsion systems. These engines are available from the Space Shuttle production line and require small changes only. Other so-called advanced propulsion systems investigated did not prove economically superior if lunar LOX is available! We assume that a Shuttle derived Heavy Lift Launch Vehicle (HLLV) will become available around the turn of the century and that this will be used to establish a research base on the lunar surface. This lunar base has the potential to grow into a lunar factory producing LOX and construction materials for supporting among other projects also the construction of space power systems in geostationary orbit. A model was developed to simulate the logistics support of such an operation for a 50-year life cycle. After 50 years 111 SPS units with 5 GW each and an availability of 90% will produce 100 × 5 = 500 GW. The model comprises 60 equations and requires 29 assumptions of the parameter involved. 60-state variables calculated with the 60 equations mentioned above are given on an annual basis and as averages for the 50-year life cycle. Recycling of defective parts in geostationary orbit is one of the features of the model. The state-of-the-art with respect to SPS technology is introduced as a variable Mg mass/MW electric power delivered. If the space manufacturing facility, a maintenance and repair facility

  9. Development of high purity large forgings for nuclear power plants

    NASA Astrophysics Data System (ADS)

    Tanaka, Yasuhiko; Sato, Ikuo

    2011-10-01

    The recent increase in the size of energy plants has been supported by the development of manufacturing technology for high purity large forgings for the key components of the plant. To assure the reliability and performance of the large forgings, refining technology to make high purity steels, casting technology for gigantic ingots, forging technology to homogenize the material and consolidate porosity are essential, together with the required heat treatment and machining technologies. To meet these needs, the double degassing method to reduce impurities, multi-pouring methods to cast the gigantic ingots, vacuum carbon deoxidization, the warm forging process and related technologies have been developed and further improved. Furthermore, melting facilities including vacuum induction melting and electro slag re-melting furnaces have been installed. By using these technologies and equipment, large forgings have been manufactured and shipped to customers. These technologies have also been applied to the manufacture of austenitic steel vessel components of the fast breeder reactors and components for fusion experiments.

  10. Optimization of hybrid power system composed of SMES and flywheel MG for large pulsed load

    NASA Astrophysics Data System (ADS)

    Niiyama, K.; Yagai, T.; Tsuda, M.; Hamajima, T.

    2008-09-01

    A superconducting magnetic storage system (SMES) has some advantages such as rapid large power response and high storage efficiency which are superior to other energy storage systems. A flywheel motor generator (FWMG) has large scaled capacity and high reliability, and hence is broadly utilized for a large pulsed load, while it has comparatively low storage efficiency due to high mechanical loss compared with SMES. A fusion power plant such as International Thermo-Nuclear Experimental Reactor (ITER) requires a large and long pulsed load which causes a frequency deviation in a utility power system. In order to keep the frequency within an allowable deviation, we propose a hybrid power system for the pulsed load, which equips the SMES and the FWMG with the utility power system. We evaluate installation cost and frequency control performance of three power systems combined with energy storage devices; (i) SMES with the utility power, (ii) FWMG with the utility power, (iii) both SMES and FWMG with the utility power. The first power system has excellent frequency power control performance but its installation cost is high. The second system has inferior frequency control performance but its installation cost is the lowest. The third system has good frequency control performance and its installation cost is attained lower than the first power system by adjusting the ratio between SMES and FWMG.

  11. 14 CFR 135.379 - Large transport category airplanes: Turbine engine powered: Takeoff limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... engine powered: Takeoff limitations. 135.379 Section 135.379 Aeronautics and Space FEDERAL AVIATION... category airplanes: Turbine engine powered: Takeoff limitations. (a) No person operating a turbine engine... existing at take- off. (b) No person operating a turbine engine powered large transport category airplane...

  12. 14 CFR 135.379 - Large transport category airplanes: Turbine engine powered: Takeoff limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... engine powered: Takeoff limitations. 135.379 Section 135.379 Aeronautics and Space FEDERAL AVIATION... category airplanes: Turbine engine powered: Takeoff limitations. (a) No person operating a turbine engine... existing at take- off. (b) No person operating a turbine engine powered large transport category airplane...

  13. Flashover lithium ion source development for large pulsed power accelerators

    SciTech Connect

    Bieg, K.W.; Burns, E.J.T.; Gerber, R.A.; Olsen, J.N.; Lamppa, K.P.

    1986-05-01

    The Particle Beam Fusion Accelerator II (PBFA II), a light-ion pulsed power accelerator intended for inertial confinement fusion (ICF) applications, is currently under construction at Sandia National Laboratories. The accelerator will deliver a 30 MV, 5 MA lithium beam from an Applied-B diode to drive an ICF target. The ion source for this diode will require a thin (approx.1 mm), dense (10/sup 16/ cm/sup -2/) anode plasma layer of singly ionized lithium over an anode area of 10/sup 3/ cm/sup 2/. One type of source being investigated is the flashover ion source, which generates the anode plasma via vacuum flashover of a lithium-bearing dielectric material. Experiments with a LiF flashover source on the 0.03 TW Nereus accelerator have shown that contaminant ions account for as much as 70% of the extracted ion beam current. To overcome this, we have explored in-diode cleaning of the externally prepared anode surface by glow discharge cleaning and vacuum baking as well as in-diode preparation of the anode surface by vacuum evaporation of the lithium dielectric. Lithium-bearing dielectric materials which have been investigated include LiF, LiI, LiNO/sub 3/, and Li/sub 3/N. These techniques have resulted in a two to threefold improvement in the extracted lithium ion purity. As a result, a glow-discharge cleaned LiF flashover source will be used for initial pulsed-power testing on PBFA II.

  14. 14 CFR 135.379 - Large transport category airplanes: Turbine engine powered: Takeoff limitations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Large transport category airplanes: Turbine... category airplanes: Turbine engine powered: Takeoff limitations. (a) No person operating a turbine engine... existing at take- off. (b) No person operating a turbine engine powered large transport category...

  15. 14 CFR 135.379 - Large transport category airplanes: Turbine engine powered: Takeoff limitations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Large transport category airplanes: Turbine... category airplanes: Turbine engine powered: Takeoff limitations. (a) No person operating a turbine engine... existing at take- off. (b) No person operating a turbine engine powered large transport category...

  16. 14 CFR 135.379 - Large transport category airplanes: Turbine engine powered: Takeoff limitations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Large transport category airplanes: Turbine... category airplanes: Turbine engine powered: Takeoff limitations. (a) No person operating a turbine engine... existing at take- off. (b) No person operating a turbine engine powered large transport category...

  17. Development of an analytical tool to study power quality of AC power systems for large spacecraft

    NASA Technical Reports Server (NTRS)

    Kraft, L. Alan; Kankam, M. David

    1991-01-01

    A harmonic power flow program applicable to space power systems with sources of harmonic distortion is described. The algorithm is a modification of the Electric Power Research Institute's HARMFLO program which assumes a three phase, balanced, AC system with loads of harmonic distortion. The modified power flow program can be used with single phase, AC systems. Early results indicate that the required modifications and the models developed are quite adequate for the analysis of a 20 kHz testbed built by General Dynamics Corporation. This is demonstrated by the acceptable correlation of present results with published data. Although the results are not exact, the discrepancies are relatively small.

  18. Development of an analytical tool to study power quality of ac power systems for large spacecraft

    NASA Technical Reports Server (NTRS)

    Kraft, L. A.; Kankam, M. D.

    1991-01-01

    A harmonic power flow program applicable to space power systems with sources of harmonic distortion is described. The algorithm is a modification of Electric Power Research Institute's HARMFLO program which assumes a three-phase, balanced, ac system with loads of harmonic distortion. The modified power flow program can be used with single phase, ac systems. Early results indicate that the required modifications and the models developed are quite adequate for the analysis of a 20-kHz testbed built by General Dynamics Corporation. This is demonstrated by the acceptable correlation of the present results with published data. Although the results are not exact, the discrepancies are relatively small.

  19. 75 FR 38800 - Jordan Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ...] Jordan Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis and... the following hydroelectric application has been filed with the Commission and is available for public... 13, 2009. d. Applicant: Jordan Hydroelectric Limited Partnership. e. Name of Project: Flannagan...

  20. 77 FR 5502 - Stuyvesant Falls Hydroelectric Project; Notice of Application Ready for Environmental Analysis...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... Federal Energy Regulatory Commission Stuyvesant Falls Hydroelectric Project; Notice of Application Ready..., New York. e. Name of Project: Stuyvesant Falls Hydroelectric Project. f. Location: On Kinderhook Creek... environmental analysis. l. The existing Stuyvesant Falls Hydroelectric Project is currently being restored...

  1. Storing hydroelectricity to meet peak-hour demand

    SciTech Connect

    Valenti, M.

    1992-04-01

    This paper reports on pumped storage plants which have become an effective way for some utility companies that derive power from hydroelectric facilities to economically store baseload energy during off-peak hours for use during peak hourly demands. According to the Electric Power Research Institute (EPRI) in Palo Alto, Calif., 36 of these plants provide approximately 20 gigawatts, or about 3 percent of U.S. generating capacity. During peak-demand periods, utilities are often stretched beyond their capacity to provide power and must therefore purchase it from neighboring utilities. Building new baseload power plants, typically nuclear or coal-fired facilities that run 24 hours per day seven days a week, is expensive, about $1500 per kilowatt, according to Robert Schainker, program manager for energy storage at the EPRI. Schainker the that building peaking plants at $400 per kilowatt, which run a few hours a day on gas or oil fuel, is less costly than building baseload plants. Operating them, however, is more expensive because peaking plants are less efficient that baseload plants.

  2. Upper arun hydroelectric project feasibility study (phase 1). Volume 1. Report. Export trade information

    SciTech Connect

    Not Available

    1987-09-01

    The report was prepared for Nepal Electricity Authority (NEA). The primary objective of the study was to compare several alternative development schemes to drive an optimum development plan for exploiting the hydroelectric potential of the Upper Arun River, to be further investigated in phase 2 of the feasibility study. The scope of work included reviewing the original project concepts establishing development alternatives investigations in the following fields: Toposurvey Mapping; Geology Geotechnics; Hydrology; Power Market; and Plan formulations.

  3. 2. VIEW SOUTH, NORTH SIDE OF HYDROELECTRIC POWERHOUSE AT LEFT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW SOUTH, NORTH SIDE OF HYDROELECTRIC POWERHOUSE AT LEFT WITH BRIDGE OVER CANAL SPILLWAY IN FOREGROUND AND MILL COMPLEX IN BACKGROUND - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  4. 2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER TRANSFORMER BUILDING AND SERVICE SHED SEEN TO LEFT BELOW DIKE - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  5. 11. VIEW NORTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE FIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. VIEW NORTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE FIT WITH INTAKE TRASH RACK AT WATER LINE AND SWITCH GEAR ON TOP - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  6. 1. CONTEXTUAL VIEW OF THE NINE MILE HYDROELECTRIC DEVELOPMENT (HED), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CONTEXTUAL VIEW OF THE NINE MILE HYDROELECTRIC DEVELOPMENT (HED), SHOWING DAM AND POWERHOUSE IN FOREGROUND, VILLAGE COMPLEX IN RIGHT BACKGROUND, LOOKING WEST FROM ABOVE STATE HIGHWAY 291 - Nine Mile Hydroelectric Development, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA

  7. 77 FR 1923 - Solia 8 Hydroelectric, LLC, FFP Missouri 13, LLC, et al.; Notice of Intent To File License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... Power''). e. Name of Projects: Point Marion Lock and Dam Project, P-13771- 001; Grays Landing Lock and.... Project No. Projects County Township P-13771 Point Marion Lock and Dam Fayette Uniontown. Hydroelectric... Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; (b) NOAA Fisheries...

  8. 77 FR 63811 - FFP Solia 6 Hydroelectric, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Solia 6 Hydroelectric, LLC; Notice of Intent To File License Application.... b. Project No.: 13768-001. c. Date Filed: August 17, 2012. d. Submitted By: Free Flow Power...

  9. Carbon emission from global hydroelectric reservoirs revisited.

    PubMed

    Li, Siyue; Zhang, Quanfa

    2014-12-01

    Substantial greenhouse gas (GHG) emissions from hydropower reservoirs have been of great concerns recently, yet the significant carbon emitters of drawdown area and reservoir downstream (including spillways and turbines as well as river reaches below dams) have not been included in global carbon budget. Here, we revisit GHG emission from hydropower reservoirs by considering reservoir surface area, drawdown zone and reservoir downstream. Our estimates demonstrate around 301.3 Tg carbon dioxide (CO2)/year and 18.7 Tg methane (CH4)/year from global hydroelectric reservoirs, which are much higher than recent observations. The sum of drawdown and downstream emission, which is generally overlooked, represents 42 % CO2 and 67 % CH4 of the total emissions from hydropower reservoirs. Accordingly, the global average emissions from hydropower are estimated to be 92 g CO2/kWh and 5.7 g CH4/kWh. Nonetheless, global hydroelectricity could currently reduce approximate 2,351 Tg CO2eq/year with respect to fuel fossil plant alternative. The new findings show a substantial revision of carbon emission from the global hydropower reservoirs.

  10. Impacts of Large Amounts of Wind Power on Design and Operation of Power Systems, Results of IEA Collaboration

    SciTech Connect

    Holttinen, H.; Meibom, P.; Orths, A.; O'Malley, M.; Ummels, B. C.; Tande, J. O.; Estanqueiro, A.; Gomez, E.; Smith, J. C.; Ela, E.

    2008-01-01

    There are a multitude of studies completed and ongoing related to the cost of wind integration. However, the results are not easy to compare. An international forum for exchange of knowledge of power system impacts of wind power has been formed under the IEA Implementing Agreement on Wind Energy. IEA WIND R and D Task 25 on 'Design and Operation of Power Systems with Large Amounts of Wind Power' produced a state-of-the-art report in October 2007, where the most relevant wind-power grid integration studies were analyzed, especially regarding methodologies and input data. This paper summarizes the results from 18 case studies, with discussion on differences in methodology as well as issues that have been identified to impact the cost of wind integration.

  11. From Milk-Medicine To Public (Re)Education Programs: An Examination Of Anishinabek Mothers' Responses To Hydroelectric Flooding In The Treaty #3 District, 1900-1975.

    PubMed

    Luby, Brittany

    2015-01-01

    This paper explores how Anishinabek women managed their households during the hydroelectric boom of the 1950s and provides new insight into flooding impact analyses. To date, historians have sought to understand how hydroelectric development compromised "subsistence" living. Research has addressed declining fish and game populations and the corresponding decline in male employment. But, what do these trends mean once the nets and traps have been emptied? By focusing on the family home, we discover that hydroelectric power generation on the Winnipeg River disrupted the environment's ability to provide resources necessary to maintain women's reproductive health (especially breast milk). Food shortages caused by hydroelectric development in the postwar era compromised Anishinabek women's ability to raise their children in accordance with cultural expectations. What emerges from this analysis is a new lens through which to theorize the voluntary enrolment of Anishinabek children in residential schools in northwestern Ontario.

  12. Modeling the vulnerability of hydroelectricity generation under drought scenarios

    NASA Astrophysics Data System (ADS)

    Yan, E.; Tidwell, V. C.; Bizjack, M.; Espinoza, V.; Jared, A.

    2015-12-01

    Hydroelectricity generation highly relies on in-stream and reservoir water availability. The western US has recently experienced increasingly sever, frequent, and prolonged droughts resulting in significant water availability issues. A large number of hydropower plants in Western Electricity Coordinating Council (WECC) are located in California River Basin and Pacific Northwest River Basin. In supporting the WECC's long-term transmission planning, a drought impact analysis was performed with a series of data and modeling tools. This presentation will demonstrate a case study for California River Basin, which has recently experienced one of the worst droughts in its history. The purpose of this study is to evaluate potential risk for hydroelectricity generation due to projected drought scenarios in the medium-term (through the year of 2030). On the basis of historical droughts and the projected drought year for 2020-2030, three drought scenarios were identified. The hydrologic model was constructed and calibrated to simulate evapotranspiration, streamflow, soil moisture, irrigation as well as reservoir storage and discharge based on various dam operation rules and targets under three drought scenarios. The model also incorporates the projected future water demand in 2030 (e.g. municipal, agricultural, electricity generation). The projected monthly reservoir discharges were used to predict the monthly hydropower generation for hydropower plants with a capacity greater than 50 MW in California River Basin for each drought scenario. The results from this study identify spatial distribution of vulnerable hydropower plants and watersheds as well as the level of potential reduction of electricity generation under various drought scenarios and provide valuable insights into future mitigation strategies and long-term planning.

  13. National Hydroelectric Power Resources Study: Potential for Increasing the Output of Existing Hydroelectric Plants. Volume 9

    DTIC Science & Technology

    1981-07-01

    Average Annual Energy, HWH APF = Annual Plant Factor DcAP = Capacity Increase, KW DcAPH = Haximum Capacity Increase, KW ru.AE = Energy Increase...MWH (CAP, AAE, APF) 5 ... E Potential (CAP, AAE, APF) 10.,E I DcAP ACHIEVABLE /lCAP AND /lAAE (CAP, AAE, APF) 20~E L ___ l ________ (CAP

  14. The influence of large-scale wind power on global climate

    PubMed Central

    Keith, David W.; DeCarolis, Joseph F.; Denkenberger, David C.; Lenschow, Donald H.; Malyshev, Sergey L.; Pacala, Stephen; Rasch, Philip J.

    2004-01-01

    Large-scale use of wind power can alter local and global climate by extracting kinetic energy and altering turbulent transport in the atmospheric boundary layer. We report climate-model simulations that address the possible climatic impacts of wind power at regional to global scales by using two general circulation models and several parameterizations of the interaction of wind turbines with the boundary layer. We find that very large amounts of wind power can produce nonnegligible climatic change at continental scales. Although large-scale effects are observed, wind power has a negligible effect on global-mean surface temperature, and it would deliver enormous global benefits by reducing emissions of CO2 and air pollutants. Our results may enable a comparison between the climate impacts due to wind power and the reduction in climatic impacts achieved by the substitution of wind for fossil fuels. PMID:15536131

  15. The influence of large-scale wind power on global climate.

    PubMed

    Keith, David W; Decarolis, Joseph F; Denkenberger, David C; Lenschow, Donald H; Malyshev, Sergey L; Pacala, Stephen; Rasch, Philip J

    2004-11-16

    Large-scale use of wind power can alter local and global climate by extracting kinetic energy and altering turbulent transport in the atmospheric boundary layer. We report climate-model simulations that address the possible climatic impacts of wind power at regional to global scales by using two general circulation models and several parameterizations of the interaction of wind turbines with the boundary layer. We find that very large amounts of wind power can produce nonnegligible climatic change at continental scales. Although large-scale effects are observed, wind power has a negligible effect on global-mean surface temperature, and it would deliver enormous global benefits by reducing emissions of CO(2) and air pollutants. Our results may enable a comparison between the climate impacts due to wind power and the reduction in climatic impacts achieved by the substitution of wind for fossil fuels.

  16. Output Control Technologies for a Large-scale PV System Considering Impacts on a Power Grid

    NASA Astrophysics Data System (ADS)

    Kuwayama, Akira

    The mega-solar demonstration project named “Verification of Grid Stabilization with Large-scale PV Power Generation systems” had been completed in March 2011 at Wakkanai, the northernmost city of Japan. The major objectives of this project were to evaluate adverse impacts of large-scale PV power generation systems connected to the power grid and develop output control technologies with integrated battery storage system. This paper describes the outline and results of this project. These results show the effectiveness of battery storage system and also proposed output control methods for a large-scale PV system to ensure stable operation of power grids. NEDO, New Energy and Industrial Technology Development Organization of Japan conducted this project and HEPCO, Hokkaido Electric Power Co., Inc managed the overall project.

  17. 77 FR 37036 - Alabama Power Company; Notice of Revised Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ...-013--Alabama Holt Hydroelectric Project] Alabama Power Company; Notice of Revised Restricted Service... inclusion in, the National Register of Historic Places at the Holt Hydroelectric Project. The PA, when... established a restricted service list for the Holt Hydroelectric Project. On June 6, 2012, the Jena Band...

  18. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    SciTech Connect

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  19. Support services for commercialization of small hydroelectric facilities in North Carolina

    SciTech Connect

    Warren, J.L.

    1980-06-01

    Small hydro is defined as those hydroelectric resources available at existing sites with a potential capacity of less than 25,000 kW, or 25 MW. There is no limitation on the height of the dam. North Carolina has between 3000 and 4000 dams. Section II reviews the assessment of the small hydro resource available in North Carolina with different data sources. Section III details the assistance given to small hydro developers in North Carolina. Section IV summarizes recommendations for future activities in support of small hydro in North Carolina. Appendices include a list of existing and potential hydroelectric sites in North Carolina, a computerized list of power potentials at existing dams in North Carolina, a list of parties interested in small hydro, a sample letter sent to small hydro developers, and the program for a small hydro conference held in Asheville in 1979.

  20. Effect of glacier ablation on the Snettisham Hydroelectric Project, Long Lake and Crater Lake Basins, Alaska

    USGS Publications Warehouse

    Sloan, C.E.; Emery, P.A.; Fair, Diana

    1986-01-01

    Long Lake Basin in the Snettisham Project Area southeast of Juneau, Alaska, yields water used for the production of hydroelectric power. Development of adjacent Crater Lake is planned to increase the Project 's generating capacity. Estimates of the hydroelectric potential of the lakes are based on streamflow records which are influenced by glaciers that cover 25% of the combined basins. Analysis of streamflow records shows that the quality and extent of records in the area are sufficient to predict flow from the Crater Creek basin with a fairly high degree of confidence. Comparison of aerial photographs indicates that glacier ablation and recession have been continuous since at least 1929. Estimates of ice-volume change from photogrammetric measurements indicate that less than 2.5% of the average runoff from the basins of Long and Crater Lakes has been from reduction in glacier-ice storage. (Author 's abstract)

  1. Condensers of large steam turbines for thermal and nuclear power stations

    NASA Astrophysics Data System (ADS)

    Nazarov, V. V.; Zaekin, L. P.

    2007-10-01

    Designs and technical characteristics of the condensers of large steam turbines for thermal and nuclear power stations operating in Russia and abroad are described. New technical solutions used in designing them are considered.

  2. 77 FR 42332 - Large Power Transformers From Korea; Revised Schedule for the Subject Investigation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... From the Federal Register Online via the Government Publishing Office INTERNATIONAL TRADE COMMISSION Large Power Transformers From Korea; Revised Schedule for the Subject Investigation AGENCY: United States International Trade Commission. ACTION: Notice. DATES: Effective Date: July 12, 2012. FOR...

  3. High power picosecond vortex laser based on a large-mode-area fiber amplifier.

    PubMed

    Tanaka, Yuichi; Okida, Masahito; Miyamoto, Katsuhiko; Omatsu, Takashige

    2009-08-03

    We present the production of picosecond vortex pulses from a stressed large-mode-area fiber amplifier for the first time. 8.5 W picosecond output with a peak power of approximately 12.5 kW was obtained at a pump power of 29 W. 2009 Optical Society of America.

  4. 77 FR 40857 - Large Power Transformers From the Republic of Korea: Final Determination of Sales at Less Than...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... International Trade Administration Large Power Transformers From the Republic of Korea: Final Determination of... large power transformers from the Republic of Korea (Korea) are being, or are likely to be, sold in the... determination in the antidumping duty investigation of large power transformers from Korea. See Large...

  5. Impacts of Large Amounts of Wind Power on Design and Operation of Power Systems; Results of IEA Collaboration

    SciTech Connect

    Parsons, B.; Ela, E.; Holttinen, H.; Meibom, P.; Orths, A.; O'Malley, M.; Ummels, B. C.; Tande, J.; Estanqueiro, A.; Gomez, E.; Smith, J. C.

    2008-06-01

    There are a multitude of studies completed and ongoing related to the cost of wind integration. However, the results are not easy to compare. An international forum for exchange of knowledge of power system impacts of wind power has been formed under the IEA Implementing Agreement on Wind Energy. IEA WIND R&D Task 25 on “Design and Operation of Power Systems with Large Amounts of Wind Power” produced a state-of-the-art report in October 2007, where the most relevant wind-power grid integration studies were analyzed, especially regarding methodologies and input data. This paper summarizes the results from 18 case studies, with discussion on differences in methodology as well as issues that have been identified to impact the cost of wind integration.

  6. Spatial-temporal dynamics and sources of total Hg in a hydroelectric reservoir in the Western Amazon, Brazil.

    PubMed

    Pestana, I A; Bastos, W R; Almeida, M G; de Carvalho, D P; Rezende, C E; Souza, C M M

    2016-05-01

    Damming rivers to construct hydroelectric reservoirs results in a series of impacts on the biogeochemical Hg cycle. For example, modifying the hydrodynamics of a natural watercourse can result in the suspension and transport of Hg deposits in the water column, which represents an exposure risk for biota. The objective of this study was to evaluate the influences of seasonality on the dispersion of total Hg in the Hydroelectric Power Plant (HPP)-Samuel Reservoir (Porto Velho/Brazil). Sampling campaigns were performed during the three following hydrological periods characteristic of the region: low (Oct/2011), ebbing (May/2012), and high (Feb/2013) water. Sediment profiles, suspended particulate matter (SPM), and aquatic macrophytes (Eicchornia crassipes and Oryza spp.) were collected, and their Hg concentrations and isotopic and elemental C and N signatures were determined. The drainage basin significantly influenced the SPM compositions during all the periods, with a small autochthonous influence from the reservoir during the low water. The highest SPM Hg concentrations inside the reservoir were observed during the high water period, suggesting that the hydrodynamics of this environment favor the suspension of fine SPM, which has a higher Hg adsorption capacity. The Hg concentrations in the sediment profiles were ten times lower than those in the SPM, indicating that large particles with low Hg concentrations were deposited to form the bottom sediment. Hg concentrations were higher in aquatic macrophyte roots than in their leaves and appeared to contribute to the formation of SPM during the low water period. In this environment, Hg transport mainly occurs in SPM from the Jamari River drainage basin, which is the primary source of Hg in this environment.

  7. Design and Operation of Power Systems with Large Amounts of Wind Power, First Results of IEA Collaboration

    SciTech Connect

    Holttinen, H.; Meibom, P.; Orths, A.; Van Hulle, F.; Ensslin, C.; Hofmann, L.; McCann, J.; Pierik, J.; Tande, J. O.; Estanqueiro, A.; Soder, L.; Strbac, G.; Parsons, B.; Smith, J. C.; Lemstrom, B.

    2006-01-01

    An international forum for exchange of knowledge of power system impacts of wind power has been formed under the IEA Implementing Agreement on Wind Energy. The task 'Design and Operation of Power Systems with Large Amounts of Wind Power' will analyse existing case studies from different power systems. There are a multitude of studies made and ongoing related to cost of wind integration. However, the results are not easy to compare. This paper summarizes the results from 10 countries and outlines the studies made at European Wind Energy Association and the European system operators UCTE and ETSO. A more in-depth review of the studies is needed to draw conclusions on the range of integration costs for wind power. A state-of-the art review process of the new IEA collaboration will seek reasons behind the wide range of results for costs of wind integration - definitions for wind penetration, reserves and costs; different power system and load characteristics and operational rules; underlying assumptions on variability and uncertainty of wind, etc.

  8. Production of the greenhouse gases CH{sub 4} and CO{sub 2} by hydroelectric reservoirs of the boreal region

    SciTech Connect

    Duchemin, E.; Lucotte, M.; Canuel, R.

    1995-12-01

    The purpose of this study was to estimate soil-water interface (benthic) and air-water interface emissions and flux of methane (CH{sub 4}) and carbon dioxide (CO{sub 2}) at two hydroelectric reservoirs in Quebec, Canada. Data were collected over 2 years at 11 sampling stations during ice-free seasons. The recorded emission fluxes were compared to water column depth, type of flooded soil, inundation history, and wind exposure. Most of the benthic fluxes measured for both gases were similar to those measured at the air-water interface. Unusual sampling conditions (e.g., strong winds, water columns less than one meter deep, or flooded peatland mats floating at the surface) resulted in above average emission fluxes. Preliminary analyses indicate that these higher emissions may be an important factor in calculating atmospheric emissions for large reservoirs. Emission fluxes at the water-air interface were determined to be controlled by molecular diffusion. Concentration profiles of the dissolved gases clearly demonstrated that oxidation and/or horizontal advection are controlling factors of atmospheric release. Neither benthic emission nor soil type appeared to control emissions of methane or carbon dioxide from the reservoirs. By rough approximation, it was proposed that hydroelectric reservoirs emit greenhouse gases on a much smaller scale than conventional thermal power plants producing equivalent amounts of energy. 51 refs., 2 figs., 3 tabs.

  9. A critical analysis of the environment impact assessment report of the 2000 MW lower subansiri hydroelectric project with special reference to the down stream ecology and people's livelihood.

    PubMed

    Baruah, Debojit; Dutta, Ranjit; Hazarika, Lakhi Prasad; Sarmah, Sarada Kanta

    2011-10-01

    The Environment Impact Assessment (EIA) report of the 2000 MW Lower Subansiri Hydroelectric Project prepared by the WAPCOS (Water and Power Consultancy Service, 2003) indicates that downstream survey was done only up to 7 km from the dam site without giving much importance to the actual scenario and avoiding some most crucial ecological aspects. In the report, insufficient records of terrestrial flora, phytoplanktons and fish diversity are given. No records of aquatic macrophytes, riparian flora, zooplanktons, avian fauna, floodplain crops, besides peoples' livelihood and diverse habitat provided by the river in its downstream are presented in the report. Especially the wetlands, associated and influenced by the unregulated Subansiri River did not find any place in the EIA report. Interestingly, no mention of the Ganges Dolphin--Platanista gangetica gangetica Roxb. could be found in the report, whereas the river provides a healthy habitat for a good number of this critically endangered fresh water dolphin. From our pre-impact study, it is clear that rich downstream ecology of the river with its present and existing environmental scenario will be adversely affected due to the construction and operation of the proposed project, and there will be distinct possibilities of elimination of other native species. In addition, people's livelihood will be affected largely through alteration of the flow regime of the river. In-depth study with comprehensive documentation of all biotic and abiotic parameters is obligatory before taking any decision about the operation of the 2000 MW Lower Subansiri Hydroelectric Project.

  10. A novel photovoltaic power system which uses a large area concentrator mirror

    NASA Technical Reports Server (NTRS)

    Arrison, Anne; Fatemi, Navid

    1987-01-01

    A preliminary analysis has been made of a novel photovoltaic power system concept. The system is composed of a small area, dense photovoltaic array, a large area solar concentrator, and a battery system for energy storage. The feasibility of such a system is assessed for space power applications. The orbital efficiency, specific power, mass, and area of the system are calculated under various conditions and compared with those for the organic Rankine cycle solar dynamic system proposed for Space Station. Near term and advanced large area concentrator photovoltaic systems not only compare favorably to solar dynamic systems in terms of performance but offer other benefits as well.

  11. 75 FR 22122 - Gibson Dam Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC; Notice of Application Accepted for... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric Project. f...

  12. 77 FR 15094 - Sawatt Hydroelectric, LLC; Notice of Application for Amendment of Exemption and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... Energy Regulatory Commission Sawatt Hydroelectric, LLC; Notice of Application for Amendment of Exemption... hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of...: Sawatt Hydroelectric, LLC. e. Name of Project: Mechanicsville Hydroelectric Project. f. Location: The...

  13. 77 FR 12835 - American Land Company, LLC, Burnshire Hydroelectric, LLC; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Energy Regulatory Commission American Land Company, LLC, Burnshire Hydroelectric, LLC; Notice of Transfer... 22, 1982,\\1\\ has been transferred to Burnshire Hydroelectric, LLC. The project is located on the... Hydroelectric Project of 5 Megawatts or Less. 2. Burnshire Hydroelectric, LLC, located at 480 N Pifer Road, Star...

  14. 75 FR 6371 - Jordan Hydroelectric Limited Partnership; Notice of Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... Energy Regulatory Commission Jordan Hydroelectric Limited Partnership; Notice of Application Accepted for... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of...: Jordan Hydroelectric Limited Partnership e. Name of Project: Flannagan Hydroelectric Project f. Location...

  15. A new framework to increase the efficiency of large-scale solar power plants.

    NASA Astrophysics Data System (ADS)

    Alimohammadi, Shahrouz; Kleissl, Jan P.

    2015-11-01

    A new framework to estimate the spatio-temporal behavior of solar power is introduced, which predicts the statistical behavior of power output at utility scale Photo-Voltaic (PV) power plants. The framework is based on spatio-temporal Gaussian Processes Regression (Kriging) models, which incorporates satellite data with the UCSD version of the Weather and Research Forecasting model. This framework is designed to improve the efficiency of the large-scale solar power plants. The results are also validated from measurements of the local pyranometer sensors, and some improvements in different scenarios are observed. Solar energy.

  16. 14 CFR 135.365 - Large transport category airplanes: Reciprocating engine powered: Weight limitations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Large transport category airplanes: Reciprocating engine powered: Weight limitations. 135.365 Section 135.365 Aeronautics and Space FEDERAL AVIATION... PERSONS ON BOARD SUCH AIRCRAFT Airplane Performance Operating Limitations § 135.365 Large...

  17. 14 CFR 135.369 - Large transport category airplanes: Reciprocating engine powered: En route limitations: All...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Large transport category airplanes... and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS AND... Limitations § 135.369 Large transport category airplanes: Reciprocating engine powered: En route...

  18. 14 CFR 135.369 - Large transport category airplanes: Reciprocating engine powered: En route limitations: All...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Large transport category airplanes... and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS AND... Limitations § 135.369 Large transport category airplanes: Reciprocating engine powered: En route...

  19. Student Understanding of Large Numbers and Powers: The Effect of Incorporating Historical Ideas

    ERIC Educational Resources Information Center

    Nataraj, Mala S.; Thomas, Michael O. J.

    2012-01-01

    The value of a consideration of large numbers and exponentiation in primary and early secondary school should not be underrated. In Indian history of mathematics, consistent naming of, and working with large numbers, including powers of ten, appears to have provided the impetus for the development of a place value system. While today's students do…

  20. 14 CFR 135.367 - Large transport category airplanes: Reciprocating engine powered: Takeoff limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Large transport category airplanes... AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Airplane Performance Operating Limitations § 135.367 Large transport category airplanes: Reciprocating engine powered: Takeoff limitations. (a)...

  1. 14 CFR 135.367 - Large transport category airplanes: Reciprocating engine powered: Takeoff limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Large transport category airplanes... AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Airplane Performance Operating Limitations § 135.367 Large transport category airplanes: Reciprocating engine powered: Takeoff limitations. (a)...

  2. 14 CFR 135.365 - Large transport category airplanes: Reciprocating engine powered: Weight limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Large transport category airplanes... PERSONS ON BOARD SUCH AIRCRAFT Airplane Performance Operating Limitations § 135.365 Large transport category airplanes: Reciprocating engine powered: Weight limitations. (a) No person may take off...

  3. 14 CFR 135.365 - Large transport category airplanes: Reciprocating engine powered: Weight limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Large transport category airplanes... PERSONS ON BOARD SUCH AIRCRAFT Airplane Performance Operating Limitations § 135.365 Large transport category airplanes: Reciprocating engine powered: Weight limitations. (a) No person may take off...

  4. 14 CFR 135.365 - Large transport category airplanes: Reciprocating engine powered: Weight limitations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Large transport category airplanes... PERSONS ON BOARD SUCH AIRCRAFT Airplane Performance Operating Limitations § 135.365 Large transport category airplanes: Reciprocating engine powered: Weight limitations. (a) No person may take off a...

  5. 14 CFR 135.367 - Large transport category airplanes: Reciprocating engine powered: Takeoff limitations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Large transport category airplanes... AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Airplane Performance Operating Limitations § 135.367 Large transport category airplanes: Reciprocating engine powered: Takeoff limitations. (a) No...

  6. 14 CFR 135.367 - Large transport category airplanes: Reciprocating engine powered: Takeoff limitations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Large transport category airplanes... AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Airplane Performance Operating Limitations § 135.367 Large transport category airplanes: Reciprocating engine powered: Takeoff limitations. (a) No...

  7. 14 CFR 135.367 - Large transport category airplanes: Reciprocating engine powered: Takeoff limitations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Large transport category airplanes... AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Airplane Performance Operating Limitations § 135.367 Large transport category airplanes: Reciprocating engine powered: Takeoff limitations. (a) No...

  8. 14 CFR 135.365 - Large transport category airplanes: Reciprocating engine powered: Weight limitations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Large transport category airplanes... PERSONS ON BOARD SUCH AIRCRAFT Airplane Performance Operating Limitations § 135.365 Large transport category airplanes: Reciprocating engine powered: Weight limitations. (a) No person may take off a...

  9. Development of an automated electrical power subsystem testbed for large spacecraft

    NASA Technical Reports Server (NTRS)

    Hall, David K.; Lollar, Louis F.

    1990-01-01

    The NASA Marshall Space Flight Center (MSFC) has developed two autonomous electrical power system breadboards. The first breadboard, the autonomously managed power system (AMPS), is a two power channel system featuring energy generation and storage and 24-kW of switchable loads, all under computer control. The second breadboard, the space station module/power management and distribution (SSM/PMAD) testbed, is a two-bus 120-Vdc model of the Space Station power subsystem featuring smart switchgear and multiple knowledge-based control systems. NASA/MSFC is combining these two breadboards to form a complete autonomous source-to-load power system called the large autonomous spacecraft electrical power system (LASEPS). LASEPS is a high-power, intelligent, physical electrical power system testbed which can be used to derive and test new power system control techniques, new power switching components, and new energy storage elements in a more accurate and realistic fashion. LASEPS has the potential to be interfaced with other spacecraft subsystem breadboards in order to simulate an entire space vehicle. The two individual systems, the combined systems (hardware and software), and the current and future uses of LASEPS are described.

  10. Development of an automated electrical power subsystem testbed for large spacecraft

    NASA Technical Reports Server (NTRS)

    Hall, David K.; Lollar, Louis F.

    1990-01-01

    The NASA Marshall Space Flight Center (MSFC) has developed two autonomous electrical power system breadboards. The first breadboard, the autonomously managed power system (AMPS), is a two power channel system featuring energy generation and storage and 24-kW of switchable loads, all under computer control. The second breadboard, the space station module/power management and distribution (SSM/PMAD) testbed, is a two-bus 120-Vdc model of the Space Station power subsystem featuring smart switchgear and multiple knowledge-based control systems. NASA/MSFC is combining these two breadboards to form a complete autonomous source-to-load power system called the large autonomous spacecraft electrical power system (LASEPS). LASEPS is a high-power, intelligent, physical electrical power system testbed which can be used to derive and test new power system control techniques, new power switching components, and new energy storage elements in a more accurate and realistic fashion. LASEPS has the potential to be interfaced with other spacecraft subsystem breadboards in order to simulate an entire space vehicle. The two individual systems, the combined systems (hardware and software), and the current and future uses of LASEPS are described.

  11. The Use of Large Transparent Ceramics in a High Powered, Diode Pumped Solid State Laser

    SciTech Connect

    Yamamoto, R; Bhachu, B; Cutter, K; Fochs, S; Letts, S; Parks, C; Rotter, M; Soules, T

    2007-09-24

    The advent of large transparent ceramics is one of the key enabling technological advances that have shown that the development of very high average power compact solid state lasers is achievable. Large ceramic neodymium doped yttrium aluminum garnet (Nd:YAG) amplifier slabs are used in Lawrence Livermore National Laboratory's (LLNL) Solid State Heat Capacity Laser (SSHCL), which has achieved world record average output powers in excess of 67 kilowatts. We will describe the attributes of using large transparent ceramics, our present system architecture and corresponding performance; as well as describe our near term future plans.

  12. Factors which affect spatial resolving power in large array biomagnetic sensors

    SciTech Connect

    Flynn, E.R. )

    1994-04-01

    A reduced chi-squared test has been used to evaluate factors that affect the spatial resolving power of large array biomagnetic sensors for the brain. Realistic array geometries are used and a classical description of spatial resolving power is applied to determine when two separate sources may be resolved. Array parameters such as sensor spacing, coil diameter, and gradiometer type are varied to determine their effect on spatial resolving power. The consequences of the number of sensors is considered and a comparison of existing systems is made. The effects of the vector nature of magnetic sources on spatial resolving power is also considered. It is shown that spatial resolving power is not strongly dependent upon individual sensor diameter, but that sensor spacing is important. It is also found that the instrumental spatial resolving power as a function of depth degrades much more quickly when planar gradiometers are used, as compared to axial gradiometers.

  13. Power monitoring and control for large scale projects: SKA, a case study

    NASA Astrophysics Data System (ADS)

    Barbosa, Domingos; Barraca, João. Paulo; Maia, Dalmiro; Carvalho, Bruno; Vieira, Jorge; Swart, Paul; Le Roux, Gerhard; Natarajan, Swaminathan; van Ardenne, Arnold; Seca, Luis

    2016-07-01

    Large sensor-based science infrastructures for radio astronomy like the SKA will be among the most intensive datadriven projects in the world, facing very high demanding computation, storage, management, and above all power demands. The geographically wide distribution of the SKA and its associated processing requirements in the form of tailored High Performance Computing (HPC) facilities, require a Greener approach towards the Information and Communications Technologies (ICT) adopted for the data processing to enable operational compliance to potentially strict power budgets. Addressing the reduction of electricity costs, improve system power monitoring and the generation and management of electricity at system level is paramount to avoid future inefficiencies and higher costs and enable fulfillments of Key Science Cases. Here we outline major characteristics and innovation approaches to address power efficiency and long-term power sustainability for radio astronomy projects, focusing on Green ICT for science and Smart power monitoring and control.

  14. Power Scaling Fiber Amplifiers Using Very-Large-Mode-Area Fibers

    DTIC Science & Technology

    2016-02-23

    Model Assessment The result of our efforts with the BPM modeling is that the method is either (a) too large and computationally intensive to...propagation method FEA finite element analysis HOM higher order mode LMA large mode area NA numerical aperture REM rate equation modeling TMI thermal... compression in high-power large -mode-area fiber amplifiers,” manuscript in preparation for Opt. Express. 22. Z. S. Eznaveh, G. Lopez-Galmiche, E. Antonio

  15. Power analysis for the design of a large area ultrasonic tactile touch panel

    NASA Astrophysics Data System (ADS)

    Yang, Yi; Lemaire-Semail, Betty; Giraud, Frédéric; Amberg, Michel; Zhang, Yuru; Giraud-Audine, Christophe

    2015-10-01

    Tactile interfaces are intuitive but lack of haptic feedback. One method to provide tactile feedback is to change the friction coefficient of the touch surface. Several small-size tactile devices have been developed to provide programmable friction coefficient based on the squeeze air film effect. This effect is produced by ultrasonic vibration of the tactile plate thanks to piezoceramics. In order to design larger embedded tactile feedback areas, a key issue is the power consumption. In this paper, we present the power analysis of a tactile device which is based on the squeeze film effect. We first investigate the source of power consumption by a series of measurements. Then, an analytical model is developed to estimate the power, which gives the conclusion that, when the vibration amplitude is constant, the power consumption is not related to the number of piezoelectric actuators. According to this result, we design a large area (198 mm × 138 mm) tactile plate with only eight piezoelectric actuators. Experimental results show that the power consumption of the large tactile plate is less than 2 W. Moreover, we also find that the power consumption of the large tactile plate was predictable with the measurement results from small plates with an average error of less than 10%.

  16. Switch: a planning tool for power systems with large shares of intermittent renewable energy.

    PubMed

    Fripp, Matthias

    2012-06-05

    Wind and solar power are highly variable, so it is it unclear how large a role they can play in future power systems. This work introduces a new open-source electricity planning model--Switch--that identifies the least-cost strategy for using renewable and conventional generators and transmission in a large power system over a multidecade period. Switch includes an unprecedented amount of spatial and temporal detail, making it possible to address a new type of question about the optimal design and operation of power systems with large amounts of renewable power. A case study of California for 2012-2027 finds that there is no maximum possible penetration of wind and solar power--these resources could potentially be used to reduce emissions 90% or more below 1990 levels without reducing reliability or severely raising the cost of electricity. This work also finds that policies that encourage customers to shift electricity demand to times when renewable power is most abundant (e.g., well-timed charging of electric vehicles) could make it possible to achieve radical emission reductions at moderate costs.

  17. Tidal power in Argentina

    SciTech Connect

    Aisiks, E.G.

    1993-03-01

    This presentation describes the tidal power potential of Argentina and the current status of its utilization. The topics of the presentation include tidal power potential, electric production of the region and the Argentine share of production and consumption, conventional hydroelectric potential, economic feasibility of tidal power production, and the general design and feasibility of a tidal power plant planned for the San Jose Gulf.

  18. 26. Original hydroelectric unit at Mormon Flat Dam. Unit is ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Original hydroelectric unit at Mormon Flat Dam. Unit is still in operation. Photographer Mark Durben, 1988. Source: Salt River Project. - Mormon Flat Dam, On Salt River, Eastern Maricopa County, east of Phoenix, Phoenix, Maricopa County, AZ

  19. 27. Original Mormon Flat hydroelectric unit showing crane above. Photographer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Original Mormon Flat hydroelectric unit showing crane above. Photographer Mark Durben, 1988. Source: Salt River Project. - Mormon Flat Dam, On Salt River, Eastern Maricopa County, east of Phoenix, Phoenix, Maricopa County, AZ

  20. 6. CLUBHOUSE. SOUTHWEST SIDE. VIEW TO NORTHEAST. Rainbow Hydroelectric ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. CLUBHOUSE. SOUTHWEST SIDE. VIEW TO NORTHEAST. - Rainbow Hydroelectric Facility, Clubhouse, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  1. 4. CLUBHOUSE. NORTHEAST SIDE. VIEW TO SOUTHWEST. Rainbow Hydroelectric ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. CLUBHOUSE. NORTHEAST SIDE. VIEW TO SOUTHWEST. - Rainbow Hydroelectric Facility, Clubhouse, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  2. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    EPA Pesticide Factsheets

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  3. 1. SWIMMING POOL. VIEW TO WEST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. SWIMMING POOL. VIEW TO WEST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  4. 2. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  5. 3. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  6. A probabilistic assessment of large scale wind power development for long-term energy resource planning

    NASA Astrophysics Data System (ADS)

    Kennedy, Scott Warren

    A steady decline in the cost of wind turbines and increased experience in their successful operation have brought this technology to the forefront of viable alternatives for large-scale power generation. Methodologies for understanding the costs and benefits of large-scale wind power development, however, are currently limited. In this thesis, a new and widely applicable technique for estimating the social benefit of large-scale wind power production is presented. The social benefit is based upon wind power's energy and capacity services and the avoidance of environmental damages. The approach uses probabilistic modeling techniques to account for the stochastic interaction between wind power availability, electricity demand, and conventional generator dispatch. A method for including the spatial smoothing effect of geographically dispersed wind farms is also introduced. The model has been used to analyze potential offshore wind power development to the south of Long Island, NY. If natural gas combined cycle (NGCC) and integrated gasifier combined cycle (IGCC) are the alternative generation sources, wind power exhibits a negative social benefit due to its high capacity cost and the relatively low emissions of these advanced fossil-fuel technologies. Environmental benefits increase significantly if charges for CO2 emissions are included. Results also reveal a diminishing social benefit as wind power penetration increases. The dependence of wind power benefits on natural gas and coal prices is also discussed. In power systems with a high penetration of wind generated electricity, the intermittent availability of wind power may influence hourly spot prices. A price responsive electricity demand model is introduced that shows a small increase in wind power value when consumers react to hourly spot prices. The effectiveness of this mechanism depends heavily on estimates of the own- and cross-price elasticities of aggregate electricity demand. This work makes a valuable

  7. 77 FR 16559 - Large Power Transformers From Korea: Scheduling of the Final Phase of an Antidumping Investigation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... COMMISSION Large Power Transformers From Korea: Scheduling of the Final Phase of an Antidumping Investigation... imports from Korea of large power transformers, provided for in subheading 8504.23.00 of the Harmonized... Commerce that imports of large power transformers from Korea are being sold in the United States at...

  8. 78 FR 6318 - Algonquin Power Company; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... Power Company. e. Name of Project: Upper Beaver Falls Hydroelectric Project (P- 2593-030) and Lower Beaver Falls Hydroelectric Project (P-2823-019). f. Location: The Upper and Lower Beaver Falls Hydroelectric Projects are located on the Beaver River in the Towns of Croghan and New Bremen in Lewis...

  9. Direct heuristic dynamic programming for damping oscillations in a large power system.

    PubMed

    Lu, Chao; Si, Jennie; Xie, Xiaorong

    2008-08-01

    This paper applies a neural-network-based approximate dynamic programming method, namely, the direct heuristic dynamic programming (direct HDP), to a large power system stability control problem. The direct HDP is a learning- and approximation-based approach to addressing nonlinear coordinated control under uncertainty. One of the major design parameters, the controller learning objective function, is formulated to directly account for network-wide low-frequency oscillation with the presence of nonlinearity, uncertainty, and coupling effect among system components. Results include a novel learning control structure based on the direct HDP with applications to two power system problems. The first case involves static var compensator supplementary damping control, which is used to provide a comprehensive evaluation of the learning control performance. The second case aims at addressing a difficult complex system challenge by providing a new solution to a large interconnected power network oscillation damping control problem that frequently occurs in the China Southern Power Grid.

  10. Overview of Small and Large-Scale Space Solar Power Concepts

    NASA Technical Reports Server (NTRS)

    Potter, Seth; Henley, Mark; Howell, Joe; Carrington, Connie; Fikes, John

    2006-01-01

    An overview of space solar power studies performed at the Boeing Company under contract with NASA will be presented. The major concepts to be presented are: 1. Power Plug in Orbit: this is a spacecraft that collects solar energy and distributes it to users in space using directed radio frequency or optical energy. Our concept uses solar arrays having the same dimensions as ISS arrays, but are assumed to be more efficient. If radiofrequency wavelengths are used, it will necessitate that the receiving satellite be equipped with a rectifying antenna (rectenna). For optical wavelengths, the solar arrays on the receiving satellite will collect the power. 2. Mars Clipper I Power Explorer: this is a solar electric Mars transfer vehicle to support human missions. A near-term precursor could be a high-power radar mapping spacecraft with self-transport capability. Advanced solar electric power systems and electric propulsion technology constitute viable elements for conducting human Mars missions that are roughly comparable in performance to similar missions utilizing alternative high thrust systems, with the one exception being their inability to achieve short Earth-Mars trip times. 3. Alternative Architectures: this task involves investigating alternatives to the traditional solar power satellite (SPS) to supply commercial power from space for use on Earth. Four concepts were studied: two using photovoltaic power generation, and two using solar dynamic power generation, with microwave and laser power transmission alternatives considered for each. All four architectures use geostationary orbit. 4. Cryogenic Propellant Depot in Earth Orbit: this concept uses large solar arrays (producing perhaps 600 kW) to electrolyze water launched from Earth, liquefy the resulting hydrogen and oxygen gases, and store them until needed by spacecraft. 5. Beam-Powered Lunar Polar Rover: a lunar rover powered by a microwave or laser beam can explore permanently shadowed craters near the lunar

  11. Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia

    NASA Astrophysics Data System (ADS)

    Turan, Faiz Mohd; Johan, Kartina

    2017-08-01

    Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.

  12. Modeling flood induced interdependencies among hydroelectricity generating infrastructures.

    PubMed

    Sultana, S; Chen, Z

    2009-08-01

    This paper presents a new kind of integrated modeling method for simulating the vulnerability of a critical infrastructure for a hazard and the subsequent interdependencies among the interconnected infrastructures. The developed method has been applied to a case study of a network of hydroelectricity generating infrastructures, e.g., water storage concrete gravity dam, penstock, power plant and transformer substation. The modeling approach is based on the fragility curves development with Monte Carlo simulation based structural-hydraulic modeling, flood frequency analysis, stochastic Petri net (SPN) modeling, and Markov Chain analysis. A certain flood level probability can be predicted from flood frequency analysis, and the most probable damage condition for this hazard can be simulated from the developed fragility curves of the dam. Consequently, the resulting interactions among the adjacent infrastructures can be quantified with SPN analysis; corresponding Markov Chain analysis simulates the long term probability matrix of infrastructure failures. The obtained results are quite convincing to prove the novel contribution of this research to the field of infrastructure interdependency analysis which might serve as a decision making tool for flood related emergency response and management.

  13. Susitna Hydroelectric Project: terrestrial environmental workshop and preliminary simulation model

    USGS Publications Warehouse

    Everitt, Robert R.; Sonntag, Nicholas C.; Auble, Gregory T.; Roelle, James E.; Gazey, William

    1982-01-01

    The technical feasibility, economic viability, and environmental impacts of a hydroelectric development project in the Susitna River Basin are being studied by Acres American, Inc. on behalf of the Alaska Power Authority. As part of these studies, Acres American recently contracted LGL Alaska Research Associates, Inc. to coordinate the terrestrial environmental studies being performed by the Alaska Department of Fish and Game and, as subcontractors to LGL, several University of Alaska research groups. LGL is responsible for further quantifying the potential impacts of the project on terrestrial wildlife and vegetation, and for developing a plan to mitigate adverse impacts on the terrestrial environment. The impact assessment and mitigation plan will be included as part of a license application to the Federal Energy Regulatory Commission (FERC) scheduled for the first quarter of 1983. The quantification of impacts, mitigation planning, and design of future research is being organized using a computer simulation modelling approach. Through a series of workshops attended by researchers, resource managers, and policy-makers, a computer model is being developed and refined for use in the quantification of impacts on terrestrial wildlife and vegetation, and for evaluating different mitigation measures such as habitat enhancement and the designation of replacement lands to be managed by wildlife habitat. This report describes the preliminary model developed at the first workshop held August 23 -27, 1982 in Anchorage.

  14. Large- and small-scale constraints on power spectra in Omega = 1 universes

    NASA Technical Reports Server (NTRS)

    Gelb, James M.; Gradwohl, Ben-Ami; Frieman, Joshua A.

    1993-01-01

    The CDM model of structure formation, normalized on large scales, leads to excessive pairwise velocity dispersions on small scales. In an attempt to circumvent this problem, we study three scenarios (all with Omega = 1) with more large-scale and less small-scale power than the standard CDM model: (1) cold dark matter with significantly reduced small-scale power (inspired by models with an admixture of cold and hot dark matter); (2) cold dark matter with a non-scale-invariant power spectrum; and (3) cold dark matter with coupling of dark matter to a long-range vector field. When normalized to COBE on large scales, such models do lead to reduced velocities on small scales and they produce fewer halos compared with CDM. However, models with sufficiently low small-scale velocities apparently fail to produce an adequate number of halos.

  15. A critical view on the eco-friendliness of small hydroelectric installations.

    PubMed

    Premalatha, M; Tabassum-Abbasi; Abbasi, Tasneem; Abbasi, S A

    2014-05-15

    Renewable energy sources are widely perceived as 'clean', 'green', and 'inexhaustible'. In recent years the spectre of global warming and ocean acidification, which has been primarily attributed to fossil fuel burning, has brought renewable energy at the forefront of most climate change mitigation strategies. There is strong advocacy for large-scale substitution of conventional energy sources with the renewables on the premise that such a move would substantially reduce environmental degradation and global warming. These sentiments are being echoed by scientists and policy makers as well as environmental activists all over the world. 'Small hydro', which generally represents hydroelectric power projects of capacities 25 MW or lower, is one of the renewable energy options which is believed to be clean and sustainable even as its bigger version, large hydro, is known to cause several strongly adverse environmental impacts. This paper brings out that the prevailing perception of 'eco-friendliness' of small hydro is mainly due to the fact that it has only been used to a very small extent so far. But once it is deployed at a scale comparable to fossil fuel use, the resulting impacts would be quite substantially adverse. The purpose is not to denegrade small hydro, less so to advocate use of fossil fuels. It, rather, is to bring home the point that a much more realistic and elaborate assessment of the likely direct as well as indirect impacts of extensive utilization of this energy source than has been done hitherto is necessary. Copyright © 2013 Elsevier B.V. All rights reserved.

  16. Genetic variation of individual alpha frequency (IAF) and alpha power in a large adolescent twin sample.

    PubMed

    Smit, Christine M; Wright, Margaret J; Hansell, Narelle K; Geffen, Gina M; Martin, Nicholas G

    2006-08-01

    To further clarify the mode of genetic transmission on individual alpha frequency (IAF) and alpha power, the extent to which individual differences in these alpha indices are influenced by genetic factors were examined in a large sample of adolescent twins (237 MZ, 282 DZ pairs; aged 16). EEG was measured at rest (eyes closed) from the right occipital site, and a second EEG recording for 50 twin pairs obtained approximately 3 months after the initial collection, enabled an estimation of measurement error. Analyses confirmed a strong genetic influence on both IAF (h(2)=0.81) and alpha power (h(2)=0.82), and there was little support for non-additive genetic (dominance) variance. A small but significant negative correlation (-0.18) was found between IAF and alpha power, but genetic influences on IAF and alpha power were largely independent. All non-genetic variance was due to unreliability, with no significant variance attributed to unique environmental factors. Relationships between the alpha and IQ indices were also explored but were generally either non-significant or very low. The findings confirm the high heritability for both IAF and alpha power, they further suggest that the mode of genetic transmission is due to additive genetic factors, that genetic influences on the underlying neural mechanisms of alpha frequency and power are largely specific, and that individual differences in alpha activity are influenced little by developmental plasticity and individual experiences.

  17. Mode instability in high power all-fiber amplifier with large-mode-area gain fiber

    NASA Astrophysics Data System (ADS)

    Wang, Jianming; Yan, Dapeng; Xiong, Songsong; Huang, Bao; Li, Cheng

    2017-08-01

    We studied the mode instability (MI) of the signal light in high power all-fiber amplifier with large-mode-area (LMA) gain fiber experimentally. The MI phenomenon of the output beam was observed and analyzed in the all-fiber amplifier, and the MI power threshold was compared by coiling gain fiber with different radii in multi-kilowatt level (more than 3 kW). In the experiments, MI power threshold was improved and optimized with coil radius reduction of the LMA gain fiber in the all-fiber amplifier.

  18. Large-scale terrestrial solar cell power generation cost: A preliminary assessment

    NASA Technical Reports Server (NTRS)

    Spakowski, A. E.; Shure, L. I.

    1972-01-01

    A cost study was made to assess the potential of the large-scale use of solar cell power for terrestrial applications. The incentive is the attraction of a zero-pollution source of power for wide-scale use. Unlike many other concepts for low-pollution power generation, even thermal pollution is avoided since only the incident solar flux is utilized. To provide a basis for comparison and a perspective for evaluation, the pertinent technology was treated in two categories: current and optimistic. Factors considered were solar cells, array assembly, power conditioning, site preparation, buildings, maintenance, and operation. The capital investment was assumed to be amortized over 30 years. The useful life of the solar cell array was assumed to be 10 years, and the cases of zero and 50-percent performance deg-radation were considered. Land costs, taxes, and profits were not included in this study because it was found too difficult to provide good generalized estimates of these items. On the basis of the factors considered, it is shown that even for optimistic projections of technology, electric power from large-sclae terrestrial use of solar cells is approximately two to three orders of magnitude more costly than current electric power generation from either fossil or nuclear fuel powerplants. For solar cell power generation to be a viable competitor on a cost basis, technological breakthroughs would be required in both solar cell and array fabrication and in site preparation.

  19. Large-area measurements of CIB power spectra with Planck HFI maps

    NASA Astrophysics Data System (ADS)

    Mak, D. S. Y.; Challinor, A.; Efstathiou, G.; Lagache, G.

    We present new measurements of the power spectra of the cosmic infrared background (CIB) anisotropies using the Planck 2015 full-mission HFI data at 353, 545, and 857 GHz over 20 000 square degrees. Unlike previous Planck measurements of the CIB power spectra, we do not rely on external HI data to remove Galactic dust emission from the Planck maps. Instead, we model the Galactic emission at the level of the power spectra, using templates constructed directly from the Planck data by exploiting the statistical isotropy of all extragalactic emission components. This allows us to work at the full resolution of Planck over large sky areas. We construct a likelihood based on the measured spectra (for multipoles 50 <= l <= 2500) using analytic covariance matrices that account for masking and the realistic instrumental noise properties. The results of an MCMC exploration of this likelihood are presented, based on simple parameterised models of the CIB power that arises from clustering of infrared galaxies. We explore simultaneously the parameters describing the clustered power, the Poisson power levels, and the amplitudes of the Galactic power spectrum templates across the six frequency (cross-)spectra. The best-fit model provides a good fit to all spectra. As an example, Fig. 1 compares the measured auto spectra at 353, 545, and 857 GHz over 40% of the sky to the power in the best-fit model. We find that the power in the CIB anisotropies from galaxy clustering is roughly equal to the Poisson power at multipoles l =2000 (the clustered power dominates on larger scales), and that our dust-cleaned CIB spectra are in good agreement with previous Planck and Herschel measurements. A key feature of our analysis is that it allows one to make many internal consistency tests. We show that our results are stable to data selection and choice of survey area, demonstrating both our ability to remove Galactic dust power to high accuracy and the statistical isotropy of the CIB signal.

  20. Building a hydroelectric project at a fishway

    SciTech Connect

    Bagnall, C.L. ); Haake, H.E. )

    1993-12-01

    It's not unusual to hear about a fishway being installed at a hydro facility. However, the reverse -- installing a hydro plant at an existing fish passage facility -- is unique. Northern Wasco County People's Utility District (PUD) in Oregon has proved the validity of the idea. For decades, the Pacific Northwest has relied upon hydropower as a reliable and economic means of generating electricity. In recent years, however, in the Columbia River Basin, efforts to protect diminishing salmon stocks have taken precedence over the development of new hydropower plants. With that in mind, the Northern Wasco County PUD in Oregon set out to develop a hydroelectric project that not only provided for fish passage, but also took advantage of an existing fishway. The Dalles Dam North Fishway Project began operating in 1991. The project site is a fishway at the US Army Corps of Engineers' The Dalles Lock and Dam. The 5-MW project received intense scrutiny from state and federal fishery agencies and Indian tribes. All of the parties worked together to settle differences and to develop a feasible project that meets multiple needs.

  1. The further environmental development of Polyphyto Hydroelectric Project reservoir in Kozani prefecture and its contribution to the life quality improvement

    NASA Astrophysics Data System (ADS)

    Saounatsou, Chara; Georgi, Julia

    2014-08-01

    The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.

  2. Large-scale data analysis of power grid resilience across multiple US service regions

    NASA Astrophysics Data System (ADS)

    Ji, Chuanyi; Wei, Yun; Mei, Henry; Calzada, Jorge; Carey, Matthew; Church, Steve; Hayes, Timothy; Nugent, Brian; Stella, Gregory; Wallace, Matthew; White, Joe; Wilcox, Robert

    2016-05-01

    Severe weather events frequently result in large-scale power failures, affecting millions of people for extended durations. However, the lack of comprehensive, detailed failure and recovery data has impeded large-scale resilience studies. Here, we analyse data from four major service regions representing Upstate New York during Super Storm Sandy and daily operations. Using non-stationary spatiotemporal random processes that relate infrastructural failures to recoveries and cost, our data analysis shows that local power failures have a disproportionally large non-local impact on people (that is, the top 20% of failures interrupted 84% of services to customers). A large number (89%) of small failures, represented by the bottom 34% of customers and commonplace devices, resulted in 56% of the total cost of 28 million customer interruption hours. Our study shows that extreme weather does not cause, but rather exacerbates, existing vulnerabilities, which are obscured in daily operations.

  3. Nonlinear modulation of the HI power spectrum on ultra-large scales. I

    SciTech Connect

    Umeh, Obinna; Maartens, Roy; Santos, Mario E-mail: roy.maartens@gmail.com

    2016-03-01

    Intensity mapping of the neutral hydrogen brightness temperature promises to provide a three-dimensional view of the universe on very large scales. Nonlinear effects are typically thought to alter only the small-scale power, but we show how they may bias the extraction of cosmological information contained in the power spectrum on ultra-large scales. For linear perturbations to remain valid on large scales, we need to renormalize perturbations at higher order. In the case of intensity mapping, the second-order contribution to clustering from weak lensing dominates the nonlinear contribution at high redshift. Renormalization modifies the mean brightness temperature and therefore the evolution bias. It also introduces a term that mimics white noise. These effects may influence forecasting analysis on ultra-large scales.

  4. Inflation that runs naturally: Gravitational waves and suppression of power at large and small scales

    NASA Astrophysics Data System (ADS)

    Minor, Quinn E.; Kaplinghat, Manoj

    2015-03-01

    We point out three correlated predictions of the axion monodromy inflation model: the large amplitude of gravitational waves, the suppression of power on horizon scales and on scales relevant for the formation of dwarf galaxies. While these predictions are likely generic to models with oscillations in the inflaton potential, the axion monodromy model naturally accommodates the required running spectral index through Planck-scale corrections to the inflaton potential. Applying this model to a combined data set of Planck, ACT, SPT, and WMAP low-ℓ polarization cosmic microwave background (CMB) data, we find a best-fit tensor-to-scalar ratio r0.05=0.07-0.04+0.05 due to gravitational waves, which may have been observed by the BICEP2 experiment. Despite the contribution of gravitational waves, the total power on large scales (CMB power spectrum at low multipoles) is lower than the standard Λ CDM cosmology with a power-law spectrum of initial perturbations and no gravitational waves, thus mitigating some of the tension on large scales. There is also a reduction in the matter power spectrum of 20-30% at scales corresponding to k =10 Mpc-1 , which are relevant for dwarf galaxy formation. This will alleviate some of the unsolved small-scale structure problems in the standard Λ CDM cosmology. The inferred matter power spectrum is also found to be consistent with recent Lyman-α forest data, which is in tension with the Planck-favored Λ CDM model with a power-law primordial power spectrum.

  5. Simulation of the transient processes of load rejection under different accident conditions in a hydroelectric generating set

    NASA Astrophysics Data System (ADS)

    Guo, W. C.; Yang, J. D.; Chen, J. P.; Peng, Z. Y.; Zhang, Y.; Chen, C. C.

    2016-11-01

    Load rejection test is one of the essential tests that carried out before the hydroelectric generating set is put into operation formally. The test aims at inspecting the rationality of the design of the water diversion and power generation system of hydropower station, reliability of the equipment of generating set and the dynamic characteristics of hydroturbine governing system. Proceeding from different accident conditions of hydroelectric generating set, this paper presents the transient processes of load rejection corresponding to different accident conditions, and elaborates the characteristics of different types of load rejection. Then the numerical simulation method of different types of load rejection is established. An engineering project is calculated to verify the validity of the method. Finally, based on the numerical simulation results, the relationship among the different types of load rejection and their functions on the design of hydropower station and the operation of load rejection test are pointed out. The results indicate that: The load rejection caused by the accident within the hydroelectric generating set is realized by emergency distributing valve, and it is the basis of the optimization for the closing law of guide vane and the calculation of regulation and guarantee. The load rejection caused by the accident outside the hydroelectric generating set is realized by the governor. It is the most efficient measure to inspect the dynamic characteristics of hydro-turbine governing system, and its closure rate of guide vane set in the governor depends on the optimization result in the former type load rejection.

  6. Active power control of solar PV generation for large interconnection frequency regulation and oscillation damping

    SciTech Connect

    Liu, Yong; Zhu, Lin; Zhan, Lingwei; Gracia, Jose R.; King, Thomas Jr.; Liu, Yilu

    2015-06-23

    Because of zero greenhouse gas emission and decreased manufacture cost, solar photovoltaic (PV) generation is expected to account for a significant portion of future power grid generation portfolio. Because it is indirectly connected to the power grid via power electronic devices, solar PV generation system is fully decoupled from the power grid, which will influence the interconnected power grid dynamic characteristics as a result. In this study, the impact of solar PV penetration on large interconnected power system frequency response and inter-area oscillation is evaluated, taking the United States Eastern Interconnection (EI) as an example. Furthermore, based on the constructed solar PV electrical control model with additional active power control loops, the potential contributions of solar PV generation to power system frequency regulation and oscillation damping are examined. The advantages of solar PV frequency support over that of wind generator are also discussed. Finally, simulation results demonstrate that solar PV generations can effectively work as ‘actuators’ in alleviating the negative impacts they bring about.

  7. Active power control of solar PV generation for large interconnection frequency regulation and oscillation damping

    DOE PAGES

    Liu, Yong; Zhu, Lin; Zhan, Lingwei; ...

    2015-06-23

    Because of zero greenhouse gas emission and decreased manufacture cost, solar photovoltaic (PV) generation is expected to account for a significant portion of future power grid generation portfolio. Because it is indirectly connected to the power grid via power electronic devices, solar PV generation system is fully decoupled from the power grid, which will influence the interconnected power grid dynamic characteristics as a result. In this study, the impact of solar PV penetration on large interconnected power system frequency response and inter-area oscillation is evaluated, taking the United States Eastern Interconnection (EI) as an example. Furthermore, based on the constructedmore » solar PV electrical control model with additional active power control loops, the potential contributions of solar PV generation to power system frequency regulation and oscillation damping are examined. The advantages of solar PV frequency support over that of wind generator are also discussed. Finally, simulation results demonstrate that solar PV generations can effectively work as ‘actuators’ in alleviating the negative impacts they bring about.« less

  8. Stability of large DC power systems using switching converters, with application to the International Space Station

    SciTech Connect

    Gholdston, E.W.; Karimi, K.; Lee, F.C.; Rajagopalan, J.; Panov, Y.; Manners, B.

    1996-12-31

    As space direct current (dc) power systems continue to grow in size, switching power converters are playing an ever larger role in power conditioning and control. When designing a large dc system using power converters are playing an ever larger role in power conditioning and control.When designing a large dc system using power converters of this type, special attention must be placed on the electrical stability of the system and of the individual loads on the system. In the design of the electric power system (EPS) of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) and its contractor team led by Boeing Defense and Space Group has placed a great deal of emphasis on designing for system and load stability. To achieve this goal, the team has expended considerable effort deriving a clear concept on defining system stability in both a general sense and specifically with respect to the space station. The ISS power system presents numerous challenges with respect to system stability, such as high power, complex sources and undefined loads. As a result, the program has derived an impedance specification approach for system stability. This approach is based on the significant relationship between source and load impedances and the effect of this relationship on system stability. This approach is limited in its applicability by the theoretical and practical limits on component designs as presented by each system segment. As a result, the overall approach to system stability implemented by the ISS program consists of specific hardware requirements coupled with extensive system analysis and hardware testing.

  9. Organic carbon burial efficiency in a subtropical hydroelectric reservoir

    NASA Astrophysics Data System (ADS)

    Mendonça, Raquel; Kosten, Sarian; Sobek, Sebastian; Jaqueline Cardoso, Simone; Figueiredo-Barros, Marcos Paulo; Henrique Duque Estrada, Carlos; Roland, Fábio

    2016-06-01

    Hydroelectric reservoirs bury significant amounts of organic carbon (OC) in their sediments. Many reservoirs are characterized by high sedimentation rates, low oxygen concentrations in bottom water and a high share of terrestrially derived OC, and all of these factors have been linked to a high efficiency of OC burial. However, investigations of OC burial efficiency (OCBE, i.e., the ratio between buried and deposited OC) in reservoirs are limited to a few studies, none of which include spatially resolved analyses. In this study we determined the spatial variation in OCBE in a large subtropical reservoir and related it to sediment characteristics. Our results show that the sediment accumulation rate explains up to 92 % of the spatial variability in OCBE, outweighing the effect of other variables, such as OC source and oxygen exposure time. OCBE at the pelagic sites varied from 48 to 86 % (mean 67 %) and decreased towards the dam. At the margins, OCBE was lower (9-17 %) due to the low sediment accumulation in shallow areas. Our data show that the variability in OCBE both along the rivers-dam and the margin-pelagic axes must be considered in whole-reservoir assessments. Combining these results with a spatially resolved assessment of sediment accumulation and OC burial in the studied reservoir, we estimated a spatially resolved mean OC burial efficiency of 57 %. Being the first assessment of OCBE with such a high spatial resolution in a reservoir, these results suggest that reservoirs may bury OC more efficiently than natural lakes.

  10. Efficient Bayesian mixed model analysis increases association power in large cohorts

    PubMed Central

    Loh, Po-Ru; Tucker, George; Bulik-Sullivan, Brendan K; Vilhjálmsson, Bjarni J; Finucane, Hilary K; Salem, Rany M; Chasman, Daniel I; Ridker, Paul M; Neale, Benjamin M; Berger, Bonnie; Patterson, Nick; Price, Alkes L

    2014-01-01

    Linear mixed models are a powerful statistical tool for identifying genetic associations and avoiding confounding. However, existing methods are computationally intractable in large cohorts, and may not optimize power. All existing methods require time cost O(MN2) (where N = #samples and M = #SNPs) and implicitly assume an infinitesimal genetic architecture in which effect sizes are normally distributed, which can limit power. Here, we present a far more efficient mixed model association method, BOLT-LMM, which requires only a small number of O(MN)-time iterations and increases power by modeling more realistic, non-infinitesimal genetic architectures via a Bayesian mixture prior on marker effect sizes. We applied BOLT-LMM to nine quantitative traits in 23,294 samples from the Women’s Genome Health Study (WGHS) and observed significant increases in power, consistent with simulations. Theory and simulations show that the boost in power increases with cohort size, making BOLT-LMM appealing for GWAS in large cohorts. PMID:25642633

  11. Large Hybrid Energy Systems for Making Low CO2 Load-Following Power and Synthetic Fuel

    SciTech Connect

    Robert S. Cherry; Richard D. Boardman; Steven Aumeier

    2012-02-01

    Hybrid energy systems using nuclear heat sources can economically produce load-following electrical power by exploiting the surplus generation capacity available at night or seasonally to make synthetic fuel. Vehicle fuel is the only current energy use large enough to absorb all the energy capacity that might be diverted from the power industry, and its ease of storage obviates problems with discontinuous synfuel production. The potential benefits and challenges of synfuels integration are illustrated by the production of methanol from natural gas (as a source of carbon) using steam from a light water nuclear power reactor which is assumed to be available in accord with a year's worth of power demand data. Methanol's synthesis process is easily adapted to using 300 C heat from a light water reactor and this simple compound can be further processed into gasoline, biodiesel, or dimethyl ether, fuels which can be used with the current vehicle fleet. A supplemental feed to the methanol process of natural gas (for energy) allows operation at constant full rate when the nuclear heat is being used to produce electrical power. The higher capital costs of such a system are offset by a lower cost of heat and power production from a large base load type of plant and by reduced costs associated with much lower CO2 emissions. Other less tangible economic benefits of this and similar hybrid systems include better use of natural resource for fuels and greater energy services security from the domestic production of vehicle fuel.

  12. Efficient Bayesian mixed-model analysis increases association power in large cohorts.

    PubMed

    Loh, Po-Ru; Tucker, George; Bulik-Sullivan, Brendan K; Vilhjálmsson, Bjarni J; Finucane, Hilary K; Salem, Rany M; Chasman, Daniel I; Ridker, Paul M; Neale, Benjamin M; Berger, Bonnie; Patterson, Nick; Price, Alkes L

    2015-03-01

    Linear mixed models are a powerful statistical tool for identifying genetic associations and avoiding confounding. However, existing methods are computationally intractable in large cohorts and may not optimize power. All existing methods require time cost O(MN(2)) (where N is the number of samples and M is the number of SNPs) and implicitly assume an infinitesimal genetic architecture in which effect sizes are normally distributed, which can limit power. Here we present a far more efficient mixed-model association method, BOLT-LMM, which requires only a small number of O(MN) time iterations and increases power by modeling more realistic, non-infinitesimal genetic architectures via a Bayesian mixture prior on marker effect sizes. We applied BOLT-LMM to 9 quantitative traits in 23,294 samples from the Women's Genome Health Study (WGHS) and observed significant increases in power, consistent with simulations. Theory and simulations show that the boost in power increases with cohort size, making BOLT-LMM appealing for genome-wide association studies in large cohorts.

  13. Sandia Laboratories in-house activities in support of solar thermal large power applications

    NASA Technical Reports Server (NTRS)

    Mar, R. W.

    1980-01-01

    The development of thermal energy storage subsystems for solar thermal large power applications is described. The emphasis is on characterizing the behavior of molten nitrate salts with regard to thermal decomposition, environmental interactions, and corrosion. Electrochemical techniques to determine the ionic species in the melt and for use in real time studies of corrosion are also briefly discussed.

  14. Guidance for a large tabletop exercise for a nuclear power plant

    SciTech Connect

    Weinstein, E.D.; Bates, E.F.; Adler, M.V.; Gant, K.S.

    1995-03-01

    Tabletop exercises are held to discuss issues related to the response of organizations to an emergency event. This document describes in task format the planning, conduct, and reporting of lessons learned for a large interagency tabletop. A sample scenario, focus areas, and discussion questions based on a simulated accident at a commercial nuclear power plant are provided.

  15. Teaching Methodology in a "Large Power Distance" Classroom: A South Korean Context

    ERIC Educational Resources Information Center

    Jambor, Paul Z.

    2005-01-01

    This paper looks at South Korea as an example of a collectivist society having a rather large power distance dimension value. In a traditional Korean classroom the teacher is at the top of the classroom hierarchy, while the students are the passive participants. Gender and age play a role in the hierarchy between students themselves. Teaching…

  16. Feasibility of large-scale power plants based on thermoelectric effects

    NASA Astrophysics Data System (ADS)

    Liu, Liping

    2014-12-01

    Heat resources of small temperature difference are easily accessible, free and enormous on the Earth. Thermoelectric effects provide the technology for converting these heat resources directly into electricity. We present designs for electricity generators based on thermoelectric effects that utilize heat resources of small temperature difference, e.g., ocean water at different depths and geothermal resources, and conclude that large-scale power plants based on thermoelectric effects are feasible and economically competitive. The key observation is that the power factor of thermoelectric materials, unlike the figure of merit, can be improved by orders of magnitude upon laminating good conductors and good thermoelectric materials. The predicted large-scale power generators based on thermoelectric effects, if validated, will have the advantages of the scalability, renewability, and free supply of heat resources of small temperature difference on the Earth.

  17. Estimating the Power Characteristics of Clusters of Large Offshore Wind Farms

    NASA Astrophysics Data System (ADS)

    Drew, D.; Barlow, J. F.; Coceal, O.; Coker, P.; Brayshaw, D.; Lenaghan, D.

    2014-12-01

    The next phase of offshore wind projects in the UK focuses on the development of very large wind farms clustered within several allocated zones. However, this change in the distribution of wind capacity brings uncertainty for the operational planning of the power system. Firstly, there are concerns that concentrating large amounts of capacity in one area could reduce some of the benefits seen by spatially dispersing the turbines, such as the smoothing of the power generation variability. Secondly, wind farms of the scale planned are likely to influence the boundary layer sufficiently to impact the performance of adjacent farms, therefore the power generation characteristics of the clusters are largely unknown. The aim of this study is to use the Weather Research and Forecasting (WRF) model to investigate the power output of a cluster of offshore wind farms for a range of extreme events, taking into account the wake effects of the individual turbines and the neighbouring farms. Each wind farm in the cluster is represented as an elevated momentum sink and a source of turbulent kinetic energy using the WRF Wind Farm Parameterization. The research focuses on the Dogger Bank zone (located in the North Sea approximately 125 km off the East coast of the UK), which could have 7.2 GW of installed capacity across six separate wind farms. For this site, a 33 year reanalysis data set (MERRA, from NASA-GMAO) has been used to identify a series of extreme event case studies. These are characterised by either periods of persistent low (or high) wind speeds, or by rapid changes in power output. The latter could be caused by small changes in the wind speed inducing large changes in power output, very high winds prompting turbine shut down, or a change in the wind direction which shifts the wake effects of the neighbouring farms in the cluster and therefore changes the wind resource available.

  18. Interactions between large space power systems and low-Earth-orbit plasmas

    NASA Technical Reports Server (NTRS)

    Stevens, N. J.

    1985-01-01

    There is a growing tendency to plan space missions that will incorporate very large space power systems. These space power systems must function in the space plasma environment, which can impose operational limitations. As the power output increases, the operating voltage also must increase and this voltage, exposed at solar array interconnects, interacts with the local plasma. The implications of such interactions are considered. The available laboratory data for biased array segment tests are reviewed to demonstrate the basic interactions considered. A data set for a floating high voltage array test was used to generate approximate relationships for positive and negative current collection from plasmas. These relationships were applied to a hypothetical 100 kW power system operating in a 400 km, near equatorial orbit. It was found that discharges from the negative regions of the array are the most probable limiting factor in array operation.

  19. Large-stroke convex micromirror actuated by electromagnetic force for optical power control.

    PubMed

    Hossain, Md Mahabub; Bin, Wu; Kong, Seong Ho

    2015-11-02

    This paper contributes a novel design and the corresponding fabrication process to research on the unique topic of micro-electro-mechanical systems (MEMS) deformable convex micromirror used for focusing-power control. In this design, the shape of a thin planar metal-coated polymer-membrane mirror is controlled electromagnetically by using the repulsive force between two magnets, a permanent magnet and a coil solenoid, installed in an actuator system. The 5 mm effective aperture of a large-stroke micromirror showed a maximum center displacement of 30.08 µm, which enabled control of optical power across a wide range that could extend up to around 20 diopters. Specifically, utilizing the maximum optical power of 20 diopter by applying a maximum controlling current of 0.8 A yielded consumption of at most 2 W of electrical power. It was also demonstrated that this micromirror could easily be integrated in miniature tunable optical imaging systems.

  20. National Hydroelectric Power Resources Study: Environmental Assessment. Volume 8

    DTIC Science & Technology

    1981-09-01

    supports some of the largest herds of big-game animals in the nation. Herds of antelope roam the plains; especially in Wyoming. The streams and river...4. Terrestrial Ecology a. Description The South Atlantic region supports a greater diversity of plant and animal species than any other region...dam consists of sloping flat slabs supported at intervals by buttresses. Earthfill dams are embankments of rock or earth with an impermeable core to

  1. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    SciTech Connect

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  2. Optimizing power cylinder lubrication on a large bore natural gas engine

    NASA Astrophysics Data System (ADS)

    Luedeman, Matthew R.

    More than 6000 integral compressors, located along America's natural gas pipelines, pump natural gas across the United States. These compressors are powered by 2-stroke, large bore natural gas burning engines. Lowering the operating costs, reducing the emissions, and ensuring that these engines remain compliant with future emission regulations are the drivers for this study. Substantial research has focused on optimizing efficiency and reducing the fuel derived emissions on this class of engine. However, significantly less research has focused on the effect and reduction of lubricating oil derived emissions. This study evaluates the impact of power cylinder lubricating oil on overall engine emissions with an emphasis on reducing oxidation catalyst poisoning. A traditional power cylinder lubricator was analyzed; power cylinder lubricating oil was found to significantly impact exhaust emissions. Lubricating oil was identified as the primary contributor of particulate matter production in a large bore natural gas engine. The particulate matter was determined to be primarily organic carbon, and most likely direct oil carryover of small oil droplets. The particulate matter production equated to 25% of the injected oil at a nominal power cylinder lubrication rate. In addition, power cylinder friction is considered the primary contributor to friction loss in the internal combustion engine. This study investigates the potential for optimizing power cylinder lubrication by controlling power cylinder injection to occur at the optimal time in the piston cycle. By injecting oil directly into the ring pack, it is believed that emissions, catalyst poisoning, friction, and wear can all be reduced. This report outlines the design and theory of two electronically controlled lubrication systems. Experimental results and evaluation of one of the systems is included.

  3. Greenhouse gas emissions from operating reserves used to backup large-scale wind power.

    PubMed

    Fripp, Matthias

    2011-11-01

    Wind farms provide electricity with no direct emissions. However, their output cannot be forecasted perfectly, even a short time ahead. Consequently, power systems with large amounts of wind power may need to keep extra fossil-fired generators turned on and ready to provide power if wind farm output drops unexpectedly. In this work, I introduce a new model for estimating the uncertainty in short-term wind power forecasts, and how this uncertainty varies as wind power is aggregated over larger regions. I then use this model to estimate the reserve requirements in order to compensate for wind forecast errors to a 99.999% level of reliability, and an upper limit on the amount of carbon dioxide that would be emitted if natural gas power plants are used for this purpose. I find that for regions larger than 500 km across, operating reserves will undo 6% or less of the greenhouse gas emission savings that would otherwise be expected from wind power.

  4. A Multiple Sensors Platform Method for Power Line Inspection Based on a Large Unmanned Helicopter.

    PubMed

    Xie, Xiaowei; Liu, Zhengjun; Xu, Caijun; Zhang, Yongzhen

    2017-05-26

    Many theoretical and experimental studies have been carried out in order to improve the efficiency and reduce labor for power line inspection, but problems related to stability, efficiency, and comprehensiveness still exist. This paper presents a multiple sensors platform method for overhead power line inspection based on the use of a large unmanned helicopter. Compared with the existing methods, multiple sensors can realize synchronized inspection on all power line components and surrounding objects within one sortie. Flight safety of unmanned helicopter, scheduling of sensors and exact tracking on power line components are very important aspects when using the proposed multiple sensors platform, therefore this paper introduces in detail the planning method for the flight path of the unmanned helicopter and tasks of the sensors before inspecting power lines, and the method used for tracking power lines and insulators automatically during the inspection process. To validate the method, experiments on a transmission line at Qingyuan in Guangdong Province were carried out, the results show that the proposed method is effective for power line inspection.

  5. A Multiple Sensors Platform Method for Power Line Inspection Based on a Large Unmanned Helicopter

    PubMed Central

    Xie, Xiaowei; Liu, Zhengjun; Xu, Caijun; Zhang, Yongzhen

    2017-01-01

    Many theoretical and experimental studies have been carried out in order to improve the efficiency and reduce labor for power line inspection, but problems related to stability, efficiency, and comprehensiveness still exist. This paper presents a multiple sensors platform method for overhead power line inspection based on the use of a large unmanned helicopter. Compared with the existing methods, multiple sensors can realize synchronized inspection on all power line components and surrounding objects within one sortie. Flight safety of unmanned helicopter, scheduling of sensors and exact tracking on power line components are very important aspects when using the proposed multiple sensors platform, therefore this paper introduces in detail the planning method for the flight path of the unmanned helicopter and tasks of the sensors before inspecting power lines, and the method used for tracking power lines and insulators automatically during the inspection process. To validate the method, experiments on a transmission line at Qingyuan in Guangdong Province were carried out, the results show that the proposed method is effective for power line inspection. PMID:28587114

  6. 51. INTAKE AND POWER HOUSE AREAS, SANTA ANA NO. 1; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. INTAKE AND POWER HOUSE AREAS, SANTA ANA NO. 1; DETAIL MAP OF SANTA ANA NO. 1 AND NO. 2 HYDROELECTRIC PROJECT, EXHIBIT K, APR. 30, 1945. SCE drawing no. 523690 (sheet no. 5; for filing with the Federal Power Commission). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  7. 52. POWER HOUSE AREA, SANTA ANA NO. 2; DETAIL MAP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. POWER HOUSE AREA, SANTA ANA NO. 2; DETAIL MAP OF SANTA ANA NO. 1 AND NO. 2 HYDROELECTRIC PROJECT, EXHIBIT K, APR. 30, 1945. SCE drawing no. 523691 (sheet no. 6; for filing with the Federal Power Commission). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  8. Selectively filled large-mode-area photonic crystal fiber for high power applications

    NASA Astrophysics Data System (ADS)

    Saini, Than S.; Kumar, Ajeet; Rastogi, Vipul; Sinha, Ravindra K.

    2013-09-01

    A large-mode-area (LMA) single-mode (SM) photonic crystal fiber (PCF) structure for applications in high power fiber lasers, amplifiers and sensors is proposed. In the proposed structure the center air hole has been removed to form the core and the six elliptical air holes of inner ring around the center core have been selectively filled with high refractive index material. Effects of design parameters on SM operation and mode area are numerically investigated by using the full vectorial finite-element method. Structure offers large-mode-area exceeding 835 μm2 at 1.064 μm wavelength. A PCF with such a large-mode-area would significantly reduce the nonlinear effects and would be useful for high power applications.

  9. Potential Coastal Pumped Hydroelectric Energy Storage Locations Identified using GIS-based Topographic Analysis

    NASA Astrophysics Data System (ADS)

    Parsons, R.; Barnhart, C. J.; Benson, S. M.

    2013-12-01

    Large-scale electrical energy storage could accommodate variable, weather dependent energy resources such as wind and solar. Pumped hydroelectric energy storage (PHS) and compressed energy storage area (CAES) have life cycle energy and financial costs that are an order of magnitude lower than conventional electrochemical storage technologies. However PHS and CAES storage technologies require specific geologic conditions. Conventional PHS requires an upper and lower reservoir separated by at least 100 m of head, but no more than 10 km in horizontal distance. Conventional PHS also impacts fresh water supplies, riparian ecosystems, and hydrologic environments. A PHS facility that uses the ocean as the lower reservoir benefits from a smaller footprint, minimal freshwater impact, and the potential to be located near off shore wind resources and population centers. Although technologically nascent, today one coastal PHS facility exists. The storage potential for coastal PHS is unknown. Can coastal PHS play a significant role in augmenting future power grids with a high faction of renewable energy supply? In this study we employ GIS-based topographic analysis to quantify the coastal PHS potential of several geographic locations, including California, Chile and Peru. We developed automated techniques that seek local topographic minima in 90 m spatial resolution shuttle radar topography mission (SRTM) digital elevation models (DEM) that satisfy the following criteria conducive to PHS: within 10 km from the sea; minimum elevation 150 m; maximum elevation 1000 m. Preliminary results suggest the global potential for coastal PHS could be very significant. For example, in northern Chile we have identified over 60 locations that satisfy the above criteria. Two of these locations could store over 10 million cubic meters of water or several GWh of energy. We plan to report a global database of candidate coastal PHS locations and to estimate their energy storage capacity.

  10. Snettisham Hydroelectric Project, Alaska second stage development, Crater lake. Final foundation report. Final report

    SciTech Connect

    Not Available

    1992-09-04

    The important geologic features and methods used to construct the Crater Lake stage of the Snettisham Hydroelectric project, built between 1985 and 1989, are discussed. The project added 31 megawatts of non-polluting, renewable electric power for Juneau, Alaska and the surrounding area. Features of the report include the power tunnel and access adits, penstock excavation, surge shaft, gate shaft and lake top. Construction aspects include the general geology, design features, construction methods, geologic conditions encountered, ground support requirements, grouting, instrumentation and tunnel filling. Foundation conditions for the Crater Lake status were excellent, permitting the power and penstock tunnel and shafts to be constructed essentially unlined. The basic rock type throughout the project is a high-quality, quartz diorite gneiss with randomly spaced, subparallel basalt dikes.... Unlined rock tunnels, Power tunnel, Penstocks, Lake tap, Surge shaft.

  11. Assessment of the technology required to develop photovoltaic power system for large scale national energy applications

    NASA Technical Reports Server (NTRS)

    Lutwack, R.

    1974-01-01

    A technical assessment of a program to develop photovoltaic power system technology for large-scale national energy applications was made by analyzing and judging the alternative candidate photovoltaic systems and development tasks. A program plan was constructed based on achieving the 10 year objective of a program to establish the practicability of large-scale terrestrial power installations using photovoltaic conversion arrays costing less than $0.50/peak W. Guidelines for the tasks of a 5 year program were derived from a set of 5 year objectives deduced from the 10 year objective. This report indicates the need for an early emphasis on the development of the single-crystal Si photovoltaic system for commercial utilization; a production goal of 5 x 10 to the 8th power peak W/year of $0.50 cells was projected for the year 1985. The developments of other photovoltaic conversion systems were assigned to longer range development roles. The status of the technology developments and the applicability of solar arrays in particular power installations, ranging from houses to central power plants, was scheduled to be verified in a series of demonstration projects. The budget recommended for the first 5 year phase of the program is $268.5M.

  12. The cost of large numbers of hypothesis tests on power, effect size and sample size.

    PubMed

    Lazzeroni, L C; Ray, A

    2012-01-01

    Advances in high-throughput biology and computer science are driving an exponential increase in the number of hypothesis tests in genomics and other scientific disciplines. Studies using current genotyping platforms frequently include a million or more tests. In addition to the monetary cost, this increase imposes a statistical cost owing to the multiple testing corrections needed to avoid large numbers of false-positive results. To safeguard against the resulting loss of power, some have suggested sample sizes on the order of tens of thousands that can be impractical for many diseases or may lower the quality of phenotypic measurements. This study examines the relationship between the number of tests on the one hand and power, detectable effect size or required sample size on the other. We show that once the number of tests is large, power can be maintained at a constant level, with comparatively small increases in the effect size or sample size. For example at the 0.05 significance level, a 13% increase in sample size is needed to maintain 80% power for ten million tests compared with one million tests, whereas a 70% increase in sample size is needed for 10 tests compared with a single test. Relative costs are less when measured by increases in the detectable effect size. We provide an interactive Excel calculator to compute power, effect size or sample size when comparing study designs or genome platforms involving different numbers of hypothesis tests. The results are reassuring in an era of extreme multiple testing.

  13. Decoupled control techniques for dual flying capacitor bridge power supplies of large superconductive magnets

    SciTech Connect

    Ehsani, M.; Hozhabri, A.; Kustom, R.L.

    1986-01-01

    The dual flying capacitor (DFC) was developed in 1976 as a method of supplying efficient bilateral power to large superconductive magnets. This power supply concept uses a second superconductive coil for energy storage. Large reversible power demands of the load magnet are met by energy exchange between the storage and load coils, through the DFC bridge. This paper will show that the DFC circuit can be decomposed into two elementary single flying capacitor (SLC) circuits which can be controlled independently. The discovery of this decoupled control concept is the origin of several new control strategies which significantly improve the performance of DFC power supplies. Microcomputer controllers containing the decoupled control algorithm were tested on a DFC system simulator. The results show that time optimal load coil current and voltage control is now achievable by a robust bang-bang control technique. Furthermore, load coil current ripple and voltage spectrum can be independently controlled, while following an arbitrary reference signal. The DFC bridge, with the decoupled controllers, is a high performance power supply candidate for superconductive magnets of fusion reactors, particle accelerators and other systems.

  14. Tazimina Hydroelectric Project, Iliamna, Alaska Final Technical and Construction Cost Report

    SciTech Connect

    HDR Alaska, Inc.

    1998-11-01

    The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. These communities have a combined population of approximately 600 residents. There is no direct road connection from these villages to larger population centers. Electric power has been generated by INNEC since 1983 using diesel generators located in the community of Newhalen. Fuel for these generators was transported up the Kvichak River, an important salmon river, and across Iliamna Lake. In dry years the river is low and fuel is flown into Iliamna and then trucked five miles into Newhalen. The cost, difficult logistics and potential spill hazard of this fuel was a primary reason for development of hydroelectric power in this area. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

  15. Improved Structure and Fabrication of Large, High-Power KHPS Rotors - Final Scientific/Technical Report

    SciTech Connect

    Corren, Dean; Colby, Jonathan; Adonizio, Mary Ann

    2013-01-29

    Verdant Power, Inc, working in partnership with the National Renewable Energy Laboratory (NREL), Sandia National Laboratories (SNL), and the University of Minnesota St. Anthony Falls Laboratory (SAFL), among other partners, used evolving Computational Fluid Dynamics (CFD) and Finite Element Analysis (FEA) models and techniques to improve the structure and fabrication of large, high-power composite Kinetic Hydropower System (KHPS) rotor blades. The objectives of the project were to: design; analyze; develop for manufacture and fabricate; and thoroughly test, in the lab and at full scale in the water, the improved KHPS rotor blade.

  16. 14 CFR 135.381 - Large transport category airplanes: Turbine engine powered: En route limitations: One engine...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Limitations § 135.381 Large transport category airplanes: Turbine engine powered: En route limitations: One engine inoperative. (a) No person operating a turbine engine powered large transport category airplane... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Large transport category airplanes: Turbine...

  17. 14 CFR 135.381 - Large transport category airplanes: Turbine engine powered: En route limitations: One engine...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Limitations § 135.381 Large transport category airplanes: Turbine engine powered: En route limitations: One engine inoperative. (a) No person operating a turbine engine powered large transport category airplane... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Large transport category airplanes: Turbine...

  18. 14 CFR 135.381 - Large transport category airplanes: Turbine engine powered: En route limitations: One engine...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Large transport category airplanes: Turbine... Limitations § 135.381 Large transport category airplanes: Turbine engine powered: En route limitations: One engine inoperative. (a) No person operating a turbine engine powered large transport category...

  19. 14 CFR 135.381 - Large transport category airplanes: Turbine engine powered: En route limitations: One engine...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Large transport category airplanes: Turbine... Limitations § 135.381 Large transport category airplanes: Turbine engine powered: En route limitations: One engine inoperative. (a) No person operating a turbine engine powered large transport category...

  20. 14 CFR 135.381 - Large transport category airplanes: Turbine engine powered: En route limitations: One engine...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Large transport category airplanes: Turbine... Limitations § 135.381 Large transport category airplanes: Turbine engine powered: En route limitations: One engine inoperative. (a) No person operating a turbine engine powered large transport category...

  1. 14 CFR 135.383 - Large transport category airplanes: Turbine engine powered: En route limitations: Two engines...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Large transport category airplanes: Turbine... Limitations § 135.383 Large transport category airplanes: Turbine engine powered: En route limitations: Two...). No person may operate a turbine engine powered large transport category airplane along an intended...

  2. 14 CFR 135.383 - Large transport category airplanes: Turbine engine powered: En route limitations: Two engines...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Large transport category airplanes: Turbine... Limitations § 135.383 Large transport category airplanes: Turbine engine powered: En route limitations: Two...). No person may operate a turbine engine powered large transport category airplane along an intended...

  3. 14 CFR 135.383 - Large transport category airplanes: Turbine engine powered: En route limitations: Two engines...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Large transport category airplanes: Turbine... Limitations § 135.383 Large transport category airplanes: Turbine engine powered: En route limitations: Two...). No person may operate a turbine engine powered large transport category airplane along an intended...

  4. 14 CFR 135.383 - Large transport category airplanes: Turbine engine powered: En route limitations: Two engines...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Large transport category airplanes: Turbine... Limitations § 135.383 Large transport category airplanes: Turbine engine powered: En route limitations: Two...). No person may operate a turbine engine powered large transport category airplane along an...

  5. 14 CFR 135.383 - Large transport category airplanes: Turbine engine powered: En route limitations: Two engines...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Large transport category airplanes: Turbine... Limitations § 135.383 Large transport category airplanes: Turbine engine powered: En route limitations: Two...). No person may operate a turbine engine powered large transport category airplane along an...

  6. Dynamic Response of Large Wind Power Plant Affected by Diverse Conditions at Individual Turbines

    SciTech Connect

    Elizondo, Marcelo A.; Lu, Shuai; Lin, Guang; Wang, Shaobu

    2014-07-31

    Diverse operating conditions at individual wind turbine generators (WTG) within wind power plants (WPPs) can affect the WPP dynamic response to system faults. For example, individual WTGs can experience diverse terminal voltage and power output caused by different wind direction and speed, affecting the response of protection and control limiters. In this paper, we present a study to investigate the dynamic response of a detailed WPP model under diverse power outputs of its individual WTGs. Wake effect is considered as the reason for diverse power outputs. The diverse WTG power output is evaluated in a test system where a large 168-machine test WPP is connected to the IEEE-39-bus system. The power output from each WTG is derived from a wake effect model that uses realistic statistical data for incoming wind speed and direction. The results show that diverse WTG output due to wake effect can affect the WPP dynamic response activating specialized control in some turbines. In addition, transient stability is affected by exhibiting uncertainty in critical clearing time calculation.

  7. The impact of wakes on power output at large offshore wind farms

    NASA Astrophysics Data System (ADS)

    Barthelmie, R. J.; Frandsen, S.; Hansen, K.; Schepers, G.; Rados, K.; Schlez, W.; Cabezon, D.; Jensen, L.; Neckelmann, S.

    2010-12-01

    The size of planned offshore wind farms is in the range 100 MW to 1 GW requiring tens to hundreds of wind turbines typically arranged in a large array. As wind farms offshore increase in size, one of the research challenges is to model interactions between the individual turbines, the atmosphere and neighbouring turbines to accurately predict power output before wind farm construction in addition to evaluation during the operation phase. The aim of the research described (part of the UpWind project) is to improve wind farm modelling and address the issue of providing more accurate power output predictions accounting for wind turbine wakes. DONG Energy and Vattenfall have allowed data from a number of cases studies to be used in this project. Detailed case studies of power losses due to wakes at the large wind farms at Nysted and Horns Rev have been analysed and are presented. A focus of the data analysis has been to understand the importance of turbulence and atmospheric stability at these offshore sites. It is evident that the magnitude of wake losses is primarily driven by wind speed but that signals from turbine spacing, turbulence and atmospheric stability can be determined. The case studies are simulated with a range of wind farm and computational fluid dynamics (CFD) models. The UpWind project presents a unique platform for model evaluation because the co-operation of a number of groups means that more models can be evaluated on standardised cases. Results shown indicate power losses due to wakes can be modelled, provided that the standard models are subject to some modifications. We also present some of the first full simulations of large offshore wind farms using CFD. Despite this progress, wake modelling of large wind farms is still subject to an unacceptably high degree of uncertainty requiring further work to understand the physical flow processes within and downwind of large wind farms.

  8. Stability of large DC power systems using switching converters, with application to the international space station

    NASA Technical Reports Server (NTRS)

    Manners, B.; Gholdston, E. W.; Karimi, K.; Lee, F. C.; Rajagopalan, J.; Panov, Y.

    1996-01-01

    As space direct current (dc) power systems continue to grow in size, switching power converters are playing an ever larger role in power conditioning and control. When designing a large dc system using power converters of this type, special attention must be placed on the electrical stability of the system and of the individual loads on the system. In the design of the electric power system (EPS) of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) and its contractor team led by Boeing Defense & Space Group has placed a great deal of emphasis on designing for system and load stability. To achieve this goal, the team has expended considerable effort deriving a dear concept on defining system stability in both a general sense and specifically with respect to the space station. The ISS power system presents numerous challenges with respect to system stability, such as high power, complex sources and undefined loads. To complicate these issues, source and load components have been designed in parallel by three major subcontractors (Boeing, Rocketdyne, and McDonnell Douglas) with interfaces to both sources and loads being designed in different countries (Russia, Japan, Canada, Europe, etc.). These issues, coupled with the program goal of limiting costs, have proven a significant challenge to the program. As a result, the program has derived an impedance specification approach for system stability. This approach is based on the significant relationship between source and load impedances and the effect of this relationship on system stability. This approach is limited in its applicability by the theoretical and practical limits on component designs as presented by each system segment. As a result, the overall approach to system stability implemented by the ISS program consists of specific hardware requirements coupled with extensive system analysis and hardware testing. Following this approach, the ISS program plans to begin

  9. 77 FR 21556 - Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto Irrigation District...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto..., 916-446-0100. c. FERC Contact: Stephen Bowler, Don Pedro Hydroelectric Project, Dispute Resolution...

  10. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... and Wildlife Service for the proposed Eagle Mountain Pumped Storage Hydroelectric Project. This...

  11. 75 FR 15705 - Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of... the Mahoning Creek Hydroelectric Project, to be located on Mahoning Creek in Armstrong County...

  12. 75 FR 73059 - Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... the Cushman Hydroelectric Project, Mason County, Washington, Environmental Impact Statement (DOE/EIS... environmental impacts from the proposed action were analyzed in the Federal Energy Regulatory Commission's (FERC's) 1996 Final Environmental Impact Statement for the Cushman Hydroelectric Project (FERC Project...

  13. 75 FR 41856 - East Texas Electric Cooperative, Inc.: Lake Livingston Hydroelectric Project; Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... Energy Regulatory Commission East Texas Electric Cooperative, Inc.: Lake Livingston Hydroelectric Project... inclusion in, the National Register of Historic Places at the proposed Lake Livingston Hydroelectric Project... Commission's responsibilities pursuant to section 106 for the project would be fulfilled through...

  14. Higher order corrections to the large scale matter power spectrum in the presence of massive neutrinos

    SciTech Connect

    Wong, Yvonne Y Y

    2008-10-15

    We present the first systematic derivation of the one-loop correction to the large scale matter power spectrum in a mixed cold + hot dark matter cosmology with subdominant massive neutrino hot dark matter. Starting with the equations of motion for the density and velocity fields, we derive perturbative solutions to these quantities and construct recursion relations for the interaction kernels, noting and justifying all approximations along the way. We find interaction kernels similar to those for a cold dark matter only universe, but with additional dependences on the neutrino energy density fraction f{sub {nu}} and the linear growth functions of the incoming wavevectors. Compared with the f{sub {nu}} = 0 case, the one-loop corrected matter power spectrum for a mixed dark matter cosmology exhibits a decrease in small scale power exceeding the canonical {approx}8f{sub {nu}} suppression predicted by linear theory, a feature also seen in multi-component N-body simulations.

  15. Application of CFB technology for large power generating units and CO{sub 2} capture

    SciTech Connect

    Ryabov, G. A. Folomeev, O. M.; Sankin, D. A.; Khaneev, K. V.; Bondarenko, I. G.; Mel'nikov, D. A.

    2010-07-15

    Data on the development of the circulating fluidized bed (CFB) technology for combustion of fuels in large power generating units are examined. The problems with raising the steam parameters and unit power of boilers with a circulating fluidized bed are examined. With the boiler system at the 460 MW unit at Lagisza (Poland) as an example, the feasibility of raising the efficiency of units with CFB boilers through deep recovery of the heat of the effluent gases and reducing expenditure for in-house needs is demonstrated. Comparative estimates of the capital and operating costs of 225 and 330 MW units are used to determine the conditions for optimum use of CFB boilers in the engineering renovation of thermal power plants in Russia. New areas for the application of CFB technology in CO{sub 2} capture are analyzed in connection with the problem of reducing greenhouse gas emissions.

  16. Vulnerability of the large-scale future smart electric power grid

    NASA Astrophysics Data System (ADS)

    Nasiruzzaman, A. B. M.; Pota, H. R.; Akter, Most. Nahida

    2014-11-01

    The changing power flow pattern of the power system, with inclusion of large-scale renewable energy sources in the distribution side of the network, has been modeled by complex network framework based bidirectional graph. The bidirectional graph accommodates the reverse power flowing back from the distribution side to the grid in the model as a reverse edge connecting two nodes. The capacity of the reverse edge is equal to the capacity of the existing edge between the nodes in the forward directional nominal graph. Increased path in the combined model, built to facilitate grid reliability and efficiency, may serve as a bottleneck in practice with removal of certain percentage of nodes or edges. The effect of removal of critical elements has been analyzed in terms of increased path length, connectivity loss, load loss, and number of overloaded lines.

  17. Comprehensive benefit evaluation of direct power-purchase for large consumers

    NASA Astrophysics Data System (ADS)

    Liu, D. N.; Li, Z. H.; Zhou, H. M.; Zhao, Q.; Xu, X. F.

    2017-06-01

    Based on "several opinions of the CPC Central Committee and the State Council on further deepening the reform of electric power system" in 2015, this paper analyses the influence of direct power-purchase for large consumers on operation benefit of power grid. In three aspects, such as economic benefit, cleaning benefit and social benefit, the index system is proposed. In which, the profit of saving coal energy consumption, reducing carbon emissions and reducing pollutant emissions is quantitative calculated. Then the subjective and objective weights and index scores are figured out through the analytic hierarchy process, entropy weight method and interval number method. Finally, the comprehensive benefit is evaluated combined with the actual study, and some suggestions are made.

  18. A prototype of wireless power and data acquisition system for large detectors

    NASA Astrophysics Data System (ADS)

    De Lurgio, P.; Djurcic, Z.; Drake, G.; Hashemian, R.; Kreps, A.; Oberling, M.; Pearson, T.; Sahoo, H.

    2015-06-01

    We have developed a prototype detector and data acquisition module that incorporates wireless power and wireless data transmission techniques. The module has no electrical connections. It receives power using photovoltaic devices, and communicates control, timing, trigger, and data using the 802.11n wireless communication standard. The work is part of a study for building a large detector having many readout channels, where it is desirable to reduce the cable plant and infrastructure. The system could also be deployed in smaller detectors that require mobility or are difficult to cable due to extreme conditions. We describe the design and operation of the prototype module, including benchmark performance measurements, and discuss aspect and issues in extrapolating to a large detector system.

  19. A Beam Position Monitor for High Power Beams with Large Transverse Dimensions

    SciTech Connect

    Arne Freyberger; Danny Dotson; Pavel Degtiarenko; Vladimir Popov

    2005-06-01

    Proper transport of the electron beam with over 0.5MW of power to the beam dump is a prerequisite for operations at Jefferson Lab. Operations has relied on imaging the beam on a beam viewer located at the entrance to the beam dump. The large beam size at the dump entrance, due to beam scattering in the experimental target, sometimes results in no observable image on the view-screen. Chemical vapor deposited silicon carbide [CVD] material with its large thermal conductivity and high melting point is well suited for surviving the thermal effects of beam exposure with this power density. We are exploring the CVD properties and how it can be used as a robust beam position monitor. Results of some beam tests with 0.5MW beams will be presented.

  20. Theoretical and experimental power from large horizontal-axis wind turbines

    NASA Technical Reports Server (NTRS)

    Viterna, L. A.; Janetzke, D. C.

    1982-01-01

    A method for calculating the output power from large horizontal-axis wind turbines is presented. Modifications to the airfoil characteristics and the momentum portion of classical blade element-momentum theory are given that improve correlation with measured data. Improvement is particularly evident at low tip-speed ratios where aerodynamic stall can occur as the blade experiences high angles of attack. Output power calculated using the modified theory is compared with measured data for several large wind turbines. These wind turbines range in size from the DOE/NASA 100 kW Mod-0 (38 m rotor diameter) to the 2000 kW Mod-1 (61 m rotor diameter). The calculated results are in good agreement with measured data from these machines.