Sample records for layout drawing dated

  1. 48. Photocopy of Architectural Layout drawing, dated August 6, 1976 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. Photocopy of Architectural Layout drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. AL-2 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - EQUIPMENT LAYOUT - SECOND FLOOR AND PLATFORM 2A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  2. 59. Photocopy of Architectural Layout drawing, dated 25 June, 1993 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    59. Photocopy of Architectural Layout drawing, dated 25 June, 1993 by US Air Force Space Command. Original drawing property of United States Air Force, 21" Space Command. AL-6 PAVE PAWS SUPPORT SYSTEMS - CAPE COD AFB, MASSACHUSETTS - LAYOUT 4-A, 5TH & 5-A. DRAWING NO. AL-6 - SHEET 7 OF 21. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  3. 57. Photocopy of Architectural Layout drawing, dated 25 June, 1993 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. Photocopy of Architectural Layout drawing, dated 25 June, 1993 by US Air Force Space Command. Original drawing property of United States Air Force, 21" Space Command. AL-3 PAVE PAWS SUPPORT SYSTEMS - CAPE COD AFB, MASSACHUSETTS - LAYOUT 1 FLOOR AND 1sr FLOOR ROOF. DRAWING NO. AL-3 - SHEET 4 OF 21. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  4. 58. Photocopy of Architectural Layout drawing, dated 25 June, 1993 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Photocopy of Architectural Layout drawing, dated 25 June, 1993 by US Air Force Space Command. Original drawing property of United States Air Force, 21" Space Command. AL-5 PAVE PAWS SUPPORT SYSTEMS - CAPE COD AFB, MASSACHUSETTS - LAYOUT 3RD, 3A, 4TH LEVELS. DRAWING NO. AL-5 - SHEET 6 OF 21 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  5. 18. Photocopy of Architectural Layout drawing, dated 25 June, 1993 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of Architectural Layout drawing, dated 25 June, 1993 by US Air Force Space Command. Original drawing property of United States Air Force, 21' Space Command AL-2 PAVE PAWS SUPPORT SYSTEMS - CAPE COD AFB, MASSACHUSETTS - SITE PLAN. DRAWING NO. AL-2 - SHEET 3 OF 21. - Cape Cod Air Station, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  6. Photographic copy of construction drawing, dated November 17, 1961, Department ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of construction drawing, dated November 17, 1961, Department of the Air Force, Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN, EQUIPMENT LAYOUT, SITE PLAN, DRAWING NO. P20-130-002 - Selfridge Field, Building No. 1025, Doolittle Drive north of D Street, Mount Clemens, Macomb County, MI

  7. 154. Photographic copy of original construction drawing dated April 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    154. Photographic copy of original construction drawing dated April 10, 1928 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; 60 X 12 SPILLWAY RING GATE CONTROL LAYOUT AND ASSEMBLY. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  8. 43. Photograph of an original construction drawing, dated October 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. Photograph of an original construction drawing, dated October 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. GROUND FLOOR PLAN, REFRIGERATION LAYOUT AND DETAILS; SHEET R-1 OF 1 SHEET - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  9. 184. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    184. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM RESEARCH FOR HOOVER DAM; LAYOUT OF CONTRACTION JOINT MEASURING DEVICES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  10. 182. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    182. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONCRETE RESEARCH FOR HOOVER DAM; LAYOUT OF INTERNAL STRAIN MEASURING DEVICES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  11. 51. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities planning Office, Iowa State University, Ames, Iowa. GROUND FLOOR PLAN, MECHANICAL FAN ROOM LAYOUT, ELECTRICAL WIRING DIAGRAM, RADIATOR, FANS 1 & 2, DETAILS; SHEET NO. 202 OF 3 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  12. Photocopy of drawing (original drawing of MacDill Field in possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of MacDill Field in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; site plan dated December, 1942) BASE LAYOUT, DECEMBER 1942 - MacDill Air Force Base, Bounded by City of Tampa North, Tampa Bay South, Old Tampa Bay West, & Hillsborough Bay East, Tampa, Hillsborough County, FL

  13. Photocopy of drawing. SPACECRAFT INDUSTRIAL AREA, O&C BUILDING, A&T AREA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing. SPACECRAFT INDUSTRIAL AREA, O&C BUILDING, A&T AREA, ALTITUDE CHAMBER “L”. NASA, John F. Kennedy Space Center, Florida. Drawing 79K00213, U.S. Army Corps of Engineers, no date. SHELL PENETRATION LAYOUT. Sheet 3 - Cape Canaveral Air Force Station, Launch Complex 39, Altitude Chambers, First Street, between Avenue D and Avenue E, Cape Canaveral, Brevard County, FL

  14. 9. Photographic copy of blueprint dated 1931; H.P. Henschien, Chicago, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photographic copy of blueprint dated 1931; H.P. Henschien, Chicago, architect; Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloom, Iowa; PLAN OF HOG DRESSING FLOOR ON 4TH LEVEL OF BUILDING 92; SHOWS LAYOUT OF DRESSING EQUIPMENT - Rath Packing Company, Hog Dressing Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  15. 116. Photographic copy of drawing (25 June 1917, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    116. Photographic copy of drawing (25 June 1917, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Drawn by Sears Department 131. 1/64 inch to one foot. Schematic plan of the Merchandise Building, describing the type of construction of the different portions of the building and shows the layout of the railroad tracks around the building. At the date of this drawing the building had all the major additons complete (to Annex A, Annex B, and the Box Factory). SCHETMATIC FLOOR PLAN - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  16. Photocopy of original drawing showing Building 3 layout (drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of original drawing showing Building 3 layout (drawing located at NAWS China Lake, Division of Public Works). J.T. STAFFORD-J.H. DAVIES-H.L. GOGERTY: DISPENSARY, CONNECTING CORRIDORS, FLOOR PLAN, ELEVATIONS, AND DETAILS - Naval Ordnance Test Station Inyokern, Dispensary, Main Site, Lauritsen Road at McIntyre Street, Ridgecrest, Kern County, CA

  17. Graph Drawing Aesthetics-Created by Users, Not Algorithms.

    PubMed

    Purchase, H C; Pilcher, C; Plimmer, B

    2012-01-01

    Prior empirical work on layout aesthetics for graph drawing algorithms has concentrated on the interpretation of existing graph drawings. We report on experiments which focus on the creation and layout of graph drawings: participants were asked to draw graphs based on adjacency lists, and to lay them out "nicely." Two interaction methods were used for creating the drawings: a sketch interface which allows for easy, natural hand movements, and a formal point-and-click interface similar to a typical graph editing system. We find, in common with many other studies, that removing edge crossings is the most significant aesthetic, but also discover that aligning nodes and edges to an underlying grid is important. We observe that the aesthetics favored by participants during creation of a graph drawing are often not evident in the final product and that the participants did not make a clear distinction between the processes of creation and layout. Our results suggest that graph drawing systems should integrate automatic layout with the user's manual editing process, and provide facilities to support grid-based graph creation.

  18. A multilevel layout algorithm for visualizing physical and genetic interaction networks, with emphasis on their modular organization.

    PubMed

    Tuikkala, Johannes; Vähämaa, Heidi; Salmela, Pekka; Nevalainen, Olli S; Aittokallio, Tero

    2012-03-26

    Graph drawing is an integral part of many systems biology studies, enabling visual exploration and mining of large-scale biological networks. While a number of layout algorithms are available in popular network analysis platforms, such as Cytoscape, it remains poorly understood how well their solutions reflect the underlying biological processes that give rise to the network connectivity structure. Moreover, visualizations obtained using conventional layout algorithms, such as those based on the force-directed drawing approach, may become uninformative when applied to larger networks with dense or clustered connectivity structure. We implemented a modified layout plug-in, named Multilevel Layout, which applies the conventional layout algorithms within a multilevel optimization framework to better capture the hierarchical modularity of many biological networks. Using a wide variety of real life biological networks, we carried out a systematic evaluation of the method in comparison with other layout algorithms in Cytoscape. The multilevel approach provided both biologically relevant and visually pleasant layout solutions in most network types, hence complementing the layout options available in Cytoscape. In particular, it could improve drawing of large-scale networks of yeast genetic interactions and human physical interactions. In more general terms, the biological evaluation framework developed here enables one to assess the layout solutions from any existing or future graph drawing algorithm as well as to optimize their performance for a given network type or structure. By making use of the multilevel modular organization when visualizing biological networks, together with the biological evaluation of the layout solutions, one can generate convenient visualizations for many network biology applications.

  19. 13. Historic drawing of rocket engine test facility layout, including ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Historic drawing of rocket engine test facility layout, including Buildings 202, 205, 206, and 206A, February 3, 1984. NASA GRC drawing number CF-101539. On file at NASA Glenn Research Center. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  20. Model aerodynamic test results for two variable cycle engine coannular exhaust systems at simulated takeoff and cruise conditions. Comprehensive data report. Volume 1: Design layouts

    NASA Technical Reports Server (NTRS)

    Nelson, D. P.

    1981-01-01

    The design layouts and detailed design drawings of coannular exhaust nozzle models for a supersonic propulsion system are presented. The layout drawings show the assembly of the component parts for each configuration. A listing of the component parts is also given.

  1. A multilevel layout algorithm for visualizing physical and genetic interaction networks, with emphasis on their modular organization

    PubMed Central

    2012-01-01

    Background Graph drawing is an integral part of many systems biology studies, enabling visual exploration and mining of large-scale biological networks. While a number of layout algorithms are available in popular network analysis platforms, such as Cytoscape, it remains poorly understood how well their solutions reflect the underlying biological processes that give rise to the network connectivity structure. Moreover, visualizations obtained using conventional layout algorithms, such as those based on the force-directed drawing approach, may become uninformative when applied to larger networks with dense or clustered connectivity structure. Methods We implemented a modified layout plug-in, named Multilevel Layout, which applies the conventional layout algorithms within a multilevel optimization framework to better capture the hierarchical modularity of many biological networks. Using a wide variety of real life biological networks, we carried out a systematic evaluation of the method in comparison with other layout algorithms in Cytoscape. Results The multilevel approach provided both biologically relevant and visually pleasant layout solutions in most network types, hence complementing the layout options available in Cytoscape. In particular, it could improve drawing of large-scale networks of yeast genetic interactions and human physical interactions. In more general terms, the biological evaluation framework developed here enables one to assess the layout solutions from any existing or future graph drawing algorithm as well as to optimize their performance for a given network type or structure. Conclusions By making use of the multilevel modular organization when visualizing biological networks, together with the biological evaluation of the layout solutions, one can generate convenient visualizations for many network biology applications. PMID:22448851

  2. A grid layout algorithm for automatic drawing of biochemical networks.

    PubMed

    Li, Weijiang; Kurata, Hiroyuki

    2005-05-01

    Visualization is indispensable in the research of complex biochemical networks. Available graph layout algorithms are not adequate for satisfactorily drawing such networks. New methods are required to visualize automatically the topological architectures and facilitate the understanding of the functions of the networks. We propose a novel layout algorithm to draw complex biochemical networks. A network is modeled as a system of interacting nodes on squared grids. A discrete cost function between each node pair is designed based on the topological relation and the geometric positions of the two nodes. The layouts are produced by minimizing the total cost. We design a fast algorithm to minimize the discrete cost function, by which candidate layouts can be produced efficiently. A simulated annealing procedure is used to choose better candidates. Our algorithm demonstrates its ability to exhibit cluster structures clearly in relatively compact layout areas without any prior knowledge. We developed Windows software to implement the algorithm for CADLIVE. All materials can be freely downloaded from http://kurata21.bio.kyutech.ac.jp/grid/grid_layout.htm; http://www.cadlive.jp/ http://kurata21.bio.kyutech.ac.jp/grid/grid_layout.htm; http://www.cadlive.jp/

  3. 29. TRACK LAYOUT, INDEX TO DRAWINGS AND INDEX TO MATERIALS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. TRACK LAYOUT, INDEX TO DRAWINGS AND INDEX TO MATERIALS, REED & STEM ARCHITECTS, ST. PAUL, NEW YORK, 1909 (Burlington Northern Collection, Seattle, Washington) - Union Passenger Station Concourse, 1713 Pacific Avenue, Tacoma, Pierce County, WA

  4. 44. Photograph of a line drawing. 'PLAN LAYOUT OF PART ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photograph of a line drawing. 'PLAN LAYOUT OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS H-1 TO H-10 INCL., GRINDING, MANUFACTURING AREA, PLANT 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant 8, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  5. 31. Photograph of a line drawing. 'PLAN LAYOUT OF PART ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photograph of a line drawing. 'PLAN LAYOUT OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS D-1 TO U-10 INCL., NITRATION, MANUFACTURING AREA, PLANT 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  6. 21. Historic drawing, Marine Railway. Equalizing Gear Layout, 1917. Photographic ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Historic drawing, Marine Railway. Equalizing Gear Layout, 1917. Photographic copy of original. Boston National Historical Park Archives, Charlestown Navy Yard. BOSTS 13439, #551-4 - Charlestown Navy Yard, Marine Railway, Between Piers 2 & 3, on Charlestown Waterfront at west end of Navy Yard, Boston, Suffolk County, MA

  7. 27. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS SECTION OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS C-1, C-3, C-5, C-6, C-7, C-9 INCL., MIXING, MANUFACTURING AREA, PLANT 'B'.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  8. 26. Historic drawing, Marine Railway. Layout of Hauling Machinery, Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Historic drawing, Marine Railway. Layout of Hauling Machinery, Building 24, 1917. Photographic copy of original. Boston National Historical Park Archives, Charlestown Navy Yark. BOSTS 13439, #551-15 - Charlestown Navy Yard, Marine Railway, Between Piers 2 & 3, on Charlestown Waterfront at west end of Navy Yard, Boston, Suffolk County, MA

  9. Graph drawing using tabu search coupled with path relinking.

    PubMed

    Dib, Fadi K; Rodgers, Peter

    2018-01-01

    Graph drawing, or the automatic layout of graphs, is a challenging problem. There are several search based methods for graph drawing which are based on optimizing an objective function which is formed from a weighted sum of multiple criteria. In this paper, we propose a new neighbourhood search method which uses a tabu search coupled with path relinking to optimize such objective functions for general graph layouts with undirected straight lines. To our knowledge, before our work, neither of these methods have been previously used in general multi-criteria graph drawing. Tabu search uses a memory list to speed up searching by avoiding previously tested solutions, while the path relinking method generates new solutions by exploring paths that connect high quality solutions. We use path relinking periodically within the tabu search procedure to speed up the identification of good solutions. We have evaluated our new method against the commonly used neighbourhood search optimization techniques: hill climbing and simulated annealing. Our evaluation examines the quality of the graph layout (objective function's value) and the speed of layout in terms of the number of evaluated solutions required to draw a graph. We also examine the relative scalability of each method. Our experimental results were applied to both random graphs and a real-world dataset. We show that our method outperforms both hill climbing and simulated annealing by producing a better layout in a lower number of evaluated solutions. In addition, we demonstrate that our method has greater scalability as it can layout larger graphs than the state-of-the-art neighbourhood search methods. Finally, we show that similar results can be produced in a real world setting by testing our method against a standard public graph dataset.

  10. Graph drawing using tabu search coupled with path relinking

    PubMed Central

    Rodgers, Peter

    2018-01-01

    Graph drawing, or the automatic layout of graphs, is a challenging problem. There are several search based methods for graph drawing which are based on optimizing an objective function which is formed from a weighted sum of multiple criteria. In this paper, we propose a new neighbourhood search method which uses a tabu search coupled with path relinking to optimize such objective functions for general graph layouts with undirected straight lines. To our knowledge, before our work, neither of these methods have been previously used in general multi-criteria graph drawing. Tabu search uses a memory list to speed up searching by avoiding previously tested solutions, while the path relinking method generates new solutions by exploring paths that connect high quality solutions. We use path relinking periodically within the tabu search procedure to speed up the identification of good solutions. We have evaluated our new method against the commonly used neighbourhood search optimization techniques: hill climbing and simulated annealing. Our evaluation examines the quality of the graph layout (objective function’s value) and the speed of layout in terms of the number of evaluated solutions required to draw a graph. We also examine the relative scalability of each method. Our experimental results were applied to both random graphs and a real-world dataset. We show that our method outperforms both hill climbing and simulated annealing by producing a better layout in a lower number of evaluated solutions. In addition, we demonstrate that our method has greater scalability as it can layout larger graphs than the state-of-the-art neighbourhood search methods. Finally, we show that similar results can be produced in a real world setting by testing our method against a standard public graph dataset. PMID:29746576

  11. 10. Photographic copy of engineering drawing showing the plumbing layout ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of engineering drawing showing the plumbing layout of Test Stand 'C' Cv Cell, vacuum line, and scrubber-condenser as erected in 1977-78. JPL drawing by VTN Consolidated, Inc. Engineers, Architects, Planners, 2301 Campus Drive, Irvine, California 92664: 'JPL-ETS E-18 (C-Stand Modifications) Flow Diagram,' sheet M-2 (JPL sheet number E18/41-0), September 1, 1977. - Jet Propulsion Laboratory Edwards Facility, Test Stand C, Edwards Air Force Base, Boron, Kern County, CA

  12. 9. Photographic copy of engineering drawing showing the mechanical layout ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photographic copy of engineering drawing showing the mechanical layout of Test Stand 'C' Cv Cell, vacuum line, and scrubber-condenser as erected in 1977-78. JPL drawing by VTN Consolidated, Inc. Engineers, Architects, Planners, 2301 Campus Drive, Irvine, California 92664: 'JPL-ETS E-18 (C-Stand Modifications) Control Elevations & Schematics,' sheet M-5 (JPL sheet number E18/44-0), 1 September 1977. - Jet Propulsion Laboratory Edwards Facility, Test Stand C, Edwards Air Force Base, Boron, Kern County, CA

  13. User-friendly design approach for analog layout design

    NASA Astrophysics Data System (ADS)

    Li, Yongfu; Lee, Zhao Chuan; Tripathi, Vikas; Perez, Valerio; Ong, Yoong Seang; Hui, Chiu Wing

    2017-03-01

    Analog circuits are sensitives to the changes in the layout environment conditions, manufacturing processes, and variations. This paper presents analog verification flow with five types of analogfocused layout constraint checks to assist engineers in identifying any potential device mismatch and layout drawing mistakes. Compared to several solutions, our approach only requires layout design, which is sufficient to recognize all the matched devices. Our approach simplifies the data preparation and allows seamless integration into the layout environment with minimum disruption to the custom layout flow. Our user-friendly analog verification flow provides the engineer with more confident with their layouts quality.

  14. 30 CFR 18.94 - Application for field approval; contents of application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... approval or certification has been issued under the provisions of Bureau of Mines Schedules 2D, 2E, 2F, or... under Bureau of Mines Schedule 2D, 2E, 2F, or 2G, photographs or a single layout drawing which clearly... certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G, a single layout drawing which clearly identifies...

  15. 30 CFR 18.94 - Application for field approval; contents of application.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... approval or certification has been issued under the provisions of Bureau of Mines Schedules 2D, 2E, 2F, or... under Bureau of Mines Schedule 2D, 2E, 2F, or 2G, photographs or a single layout drawing which clearly... certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G, a single layout drawing which clearly identifies...

  16. 30 CFR 18.94 - Application for field approval; contents of application.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... approval or certification has been issued under the provisions of Bureau of Mines Schedules 2D, 2E, 2F, or... under Bureau of Mines Schedule 2D, 2E, 2F, or 2G, photographs or a single layout drawing which clearly... certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G, a single layout drawing which clearly identifies...

  17. 30 CFR 18.94 - Application for field approval; contents of application.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... approval or certification has been issued under the provisions of Bureau of Mines Schedules 2D, 2E, 2F, or... under Bureau of Mines Schedule 2D, 2E, 2F, or 2G, photographs or a single layout drawing which clearly... certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G, a single layout drawing which clearly identifies...

  18. 30 CFR 18.94 - Application for field approval; contents of application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... approval or certification has been issued under the provisions of Bureau of Mines Schedules 2D, 2E, 2F, or... under Bureau of Mines Schedule 2D, 2E, 2F, or 2G, photographs or a single layout drawing which clearly... certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G, a single layout drawing which clearly identifies...

  19. 25. VIEW OF THE MACHINE TOOL LAYOUT IN ROOMS 244 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. VIEW OF THE MACHINE TOOL LAYOUT IN ROOMS 244 AND 296. MACHINES WERE USED FOR STAINLESS STEEL FABRICATION (THE J-LINE). THE ORIGINAL DRAWING HAS BEEN ARCHIVED ON MICROFILM. THE DRAWING WAS REPRODUCED AT THE BEST QUALITY POSSIBLE. LETTERS AND NUMBERS IN THE CIRCLES INDICATE FOOTER AND/OR COLUMN LOCATIONS. - Rocky Flats Plant, General Manufacturing, Support, Records-Central Computing, Southern portion of Plant, Golden, Jefferson County, CO

  20. 20. Photocopy of drawing (1961 mechanical drawing by Kaiser Engineers) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of drawing (1961 mechanical drawing by Kaiser Engineers) ELECTRICAL LAYOUTS FOR VEHICLE SUPPORT BUILDING, SHEET E-2 - Vandenberg Air Force Base, Space Launch Complex 3, Vehicle Support Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  1. An efficient biological pathway layout algorithm combining grid-layout and spring embedder for complicated cellular location information

    PubMed Central

    2010-01-01

    Background Graph drawing is one of the important techniques for understanding biological regulations in a cell or among cells at the pathway level. Among many available layout algorithms, the spring embedder algorithm is widely used not only for pathway drawing but also for circuit placement and www visualization and so on because of the harmonized appearance of its results. For pathway drawing, location information is essential for its comprehension. However, complex shapes need to be taken into account when torus-shaped location information such as nuclear inner membrane, nuclear outer membrane, and plasma membrane is considered. Unfortunately, the spring embedder algorithm cannot easily handle such information. In addition, crossings between edges and nodes are usually not considered explicitly. Results We proposed a new grid-layout algorithm based on the spring embedder algorithm that can handle location information and provide layouts with harmonized appearance. In grid-layout algorithms, the mapping of nodes to grid points that minimizes a cost function is searched. By imposing positional constraints on grid points, location information including complex shapes can be easily considered. Our layout algorithm includes the spring embedder cost as a component of the cost function. We further extend the layout algorithm to enable dynamic update of the positions and sizes of compartments at each step. Conclusions The new spring embedder-based grid-layout algorithm and a spring embedder algorithm are applied to three biological pathways; endothelial cell model, Fas-induced apoptosis model, and C. elegans cell fate simulation model. From the positional constraints, all the results of our algorithm satisfy location information, and hence, more comprehensible layouts are obtained as compared to the spring embedder algorithm. From the comparison of the number of crossings, the results of the grid-layout-based algorithm tend to contain more crossings than those of the spring embedder algorithm due to the positional constraints. For a fair comparison, we also apply our proposed method without positional constraints. This comparison shows that these results contain less crossings than those of the spring embedder algorithm. We also compared layouts of the proposed algorithm with and without compartment update and verified that latter can reach better local optima. PMID:20565884

  2. Conversion of KEGG metabolic pathways to SBGN maps including automatic layout

    PubMed Central

    2013-01-01

    Background Biologists make frequent use of databases containing large and complex biological networks. One popular database is the Kyoto Encyclopedia of Genes and Genomes (KEGG) which uses its own graphical representation and manual layout for pathways. While some general drawing conventions exist for biological networks, arbitrary graphical representations are very common. Recently, a new standard has been established for displaying biological processes, the Systems Biology Graphical Notation (SBGN), which aims to unify the look of such maps. Ideally, online repositories such as KEGG would automatically provide networks in a variety of notations including SBGN. Unfortunately, this is non‐trivial, since converting between notations may add, remove or otherwise alter map elements so that the existing layout cannot be simply reused. Results Here we describe a methodology for automatic translation of KEGG metabolic pathways into the SBGN format. We infer important properties of the KEGG layout and treat these as layout constraints that are maintained during the conversion to SBGN maps. Conclusions This allows for the drawing and layout conventions of SBGN to be followed while creating maps that are still recognizably the original KEGG pathways. This article details the steps in this process and provides examples of the final result. PMID:23953132

  3. 26. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS SECTION OF PART I, SECTION 8, BUILDINGS NO. C-1, C-3, C-5, C-6, C-7, C-9, MIXING, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  4. Automatic Constraint Detection for 2D Layout Regularization.

    PubMed

    Jiang, Haiyong; Nan, Liangliang; Yan, Dong-Ming; Dong, Weiming; Zhang, Xiaopeng; Wonka, Peter

    2016-08-01

    In this paper, we address the problem of constraint detection for layout regularization. The layout we consider is a set of two-dimensional elements where each element is represented by its bounding box. Layout regularization is important in digitizing plans or images, such as floor plans and facade images, and in the improvement of user-created contents, such as architectural drawings and slide layouts. To regularize a layout, we aim to improve the input by detecting and subsequently enforcing alignment, size, and distance constraints between layout elements. Similar to previous work, we formulate layout regularization as a quadratic programming problem. In addition, we propose a novel optimization algorithm that automatically detects constraints. We evaluate the proposed framework using a variety of input layouts from different applications. Our results demonstrate that our method has superior performance to the state of the art.

  5. An algorithm for automated layout of process description maps drawn in SBGN.

    PubMed

    Genc, Begum; Dogrusoz, Ugur

    2016-01-01

    Evolving technology has increased the focus on genomics. The combination of today's advanced techniques with decades of molecular biology research has yielded huge amounts of pathway data. A standard, named the Systems Biology Graphical Notation (SBGN), was recently introduced to allow scientists to represent biological pathways in an unambiguous, easy-to-understand and efficient manner. Although there are a number of automated layout algorithms for various types of biological networks, currently none specialize on process description (PD) maps as defined by SBGN. We propose a new automated layout algorithm for PD maps drawn in SBGN. Our algorithm is based on a force-directed automated layout algorithm called Compound Spring Embedder (CoSE). On top of the existing force scheme, additional heuristics employing new types of forces and movement rules are defined to address SBGN-specific rules. Our algorithm is the only automatic layout algorithm that properly addresses all SBGN rules for drawing PD maps, including placement of substrates and products of process nodes on opposite sides, compact tiling of members of molecular complexes and extensively making use of nested structures (compound nodes) to properly draw cellular locations and molecular complex structures. As demonstrated experimentally, the algorithm results in significant improvements over use of a generic layout algorithm such as CoSE in addressing SBGN rules on top of commonly accepted graph drawing criteria. An implementation of our algorithm in Java is available within ChiLay library (https://github.com/iVis-at-Bilkent/chilay). ugur@cs.bilkent.edu.tr or dogrusoz@cbio.mskcc.org Supplementary data are available at Bioinformatics online. © The Author 2015. Published by Oxford University Press.

  6. An algorithm for automated layout of process description maps drawn in SBGN

    PubMed Central

    Genc, Begum; Dogrusoz, Ugur

    2016-01-01

    Motivation: Evolving technology has increased the focus on genomics. The combination of today’s advanced techniques with decades of molecular biology research has yielded huge amounts of pathway data. A standard, named the Systems Biology Graphical Notation (SBGN), was recently introduced to allow scientists to represent biological pathways in an unambiguous, easy-to-understand and efficient manner. Although there are a number of automated layout algorithms for various types of biological networks, currently none specialize on process description (PD) maps as defined by SBGN. Results: We propose a new automated layout algorithm for PD maps drawn in SBGN. Our algorithm is based on a force-directed automated layout algorithm called Compound Spring Embedder (CoSE). On top of the existing force scheme, additional heuristics employing new types of forces and movement rules are defined to address SBGN-specific rules. Our algorithm is the only automatic layout algorithm that properly addresses all SBGN rules for drawing PD maps, including placement of substrates and products of process nodes on opposite sides, compact tiling of members of molecular complexes and extensively making use of nested structures (compound nodes) to properly draw cellular locations and molecular complex structures. As demonstrated experimentally, the algorithm results in significant improvements over use of a generic layout algorithm such as CoSE in addressing SBGN rules on top of commonly accepted graph drawing criteria. Availability and implementation: An implementation of our algorithm in Java is available within ChiLay library (https://github.com/iVis-at-Bilkent/chilay). Contact: ugur@cs.bilkent.edu.tr or dogrusoz@cbio.mskcc.org Supplementary information: Supplementary data are available at Bioinformatics online. PMID:26363029

  7. Neural Activity Associated with Visual Search for Line Drawings on AAC Displays: An Exploration of the Use of fMRI.

    PubMed

    Wilkinson, Krista M; Dennis, Nancy A; Webb, Christina E; Therrien, Mari; Stradtman, Megan; Farmer, Jacquelyn; Leach, Raevynn; Warrenfeltz, Megan; Zeuner, Courtney

    2015-01-01

    Visual aided augmentative and alternative communication (AAC) consists of books or technologies that contain visual symbols to supplement spoken language. A common observation concerning some forms of aided AAC is that message preparation can be frustratingly slow. We explored the uses of fMRI to examine the neural correlates of visual search for line drawings on AAC displays in 18 college students under two experimental conditions. Under one condition, the location of the icons remained stable and participants were able to learn the spatial layout of the display. Under the other condition, constant shuffling of the locations of the icons prevented participants from learning the layout, impeding rapid search. Brain activation was contrasted under these conditions. Rapid search in the stable display was associated with greater activation of cortical and subcortical regions associated with memory, motor learning, and dorsal visual pathways compared to the search in the unpredictable display. Rapid search for line drawings on stable AAC displays involves not just the conceptual knowledge of the symbol meaning but also the integration of motor, memory, and visual-spatial knowledge about the display layout. Further research must study individuals who use AAC, as well as the functional effect of interventions that promote knowledge about array layout.

  8. Photocopy of drawing (original drawing of MacDill Field in possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of MacDill Field in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1952 architectural drawings by Strategic Air Command, MacDill Air Force Base) BASE LAYOUT, 1952 - MacDill Air Force Base, Bounded by City of Tampa North, Tampa Bay South, Old Tampa Bay West, & Hillsborough Bay East, Tampa, Hillsborough County, FL

  9. FACILITY LAYOUT OF FUEL STORAGE BUILDING (CPP603) SHOWING STORAGE BASINS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY LAYOUT OF FUEL STORAGE BUILDING (CPP-603) SHOWING STORAGE BASINS, FUEL ELEMENT CUTTING FACILITY, AND DRY GRAPHITE STORAGE FACILITY. INL DRAWING NUMBER 200-0603-00-030-056329. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  10. EQUIPMENT LAYOUT OF MAIN PROCESSING BUILDING (CPP601) LCELL PLAN AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    EQUIPMENT LAYOUT OF MAIN PROCESSING BUILDING (CPP-601) L-CELL PLAN AND SECTION SHOWS COMPLEXITY OF CELLS. INL DRAWING NUMBER 200-0601-00-098-105687. ALTERNATE ID NUMBER 4289-20-301. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  11. 41. Photocopy of scale drawing (from Station 'L' office files, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photocopy of scale drawing (from Station 'L' office files, Portland, Oregon) Portland General Electric in house drawing, 6/28/1928 PLAN (TOP) AND ELEVATION (BOTTOM) OF BOILER #13 BUILDING L4, GENERAL LAYOUT OF THE STEAM PIPING SYSTEM - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR

  12. Line drawing of layout of Scietific Instrument Module of Apollo 16

    NASA Image and Video Library

    1972-03-01

    A line drawing illustrating the layout of the Scietific Instrument Module (SIM) of the Apollo 16 Service Module. Shown here is the location in the SIM bay of the equipment for each orbital experiment. Arrows point to various components of the SIM bay. The sensors for the gamma ray spectrometer and the mas spectrometer both extend outward on a boom about 25 feet when the instruments are in use. The subsatellite is launched while the Service Module is in orbit around the moon. The film cassettes must be retrieved prior to Command Module/Service Module separation.

  13. Creative Computer Detective: The Basics of Teaching Desktop Publishing.

    ERIC Educational Resources Information Center

    Slothower, Jodie

    Teaching desktop publishing (dtp) in college journalism classes is most effective when the instructor integrates into specific courses four types of software--a word processor, a draw program, a paint program and a layout program. In a course on design and layout, the instructor can demonstrate with the computer how good design can be created and…

  14. 48 CFR 52.236-21 - Specifications and Drawings for Construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of... shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or..., diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data...

  15. Photocopy of drawing (this photograph is an 8" x 10" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (this photograph is an 8" x 10" copy of an 8" x 10" negative; 1989 original architectural drawing located at Building No. 458, NAS Pensacola, Florida) Renovation and revised office layout, Building No. 45, third floor, architectural floor plans, details and schedules, Sheet 1 of 3 - U.S. Naval Air Station, Equipment Shops & Offices, 206 South Avenue, Pensacola, Escambia County, FL

  16. 129. Photographic copy of drawing (24 June 1963, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    129. Photographic copy of drawing (24 June 1963, original drawing in Archives, Public Affairs Departmentm, Sears Merchandise Group, Hoffman Estates, Illinois). Swain and Meyers, Inc. 1/4 inch to one foot. Partial floor plan illustrating the layout of the large package handling area. Tables and equipment not present at the time of the survey are shown. SECOND FLOOR, SECTON B - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  17. The Systems Biology Markup Language (SBML) Level 3 Package: Layout, Version 1 Core.

    PubMed

    Gauges, Ralph; Rost, Ursula; Sahle, Sven; Wengler, Katja; Bergmann, Frank T

    2015-06-01

    Many software tools provide facilities for depicting reaction network diagrams in a visual form. Two aspects of such a visual diagram can be distinguished: the layout (i.e.: the positioning and connections) of the elements in the diagram, and the graphical form of the elements (for example, the glyphs used for symbols, the properties of the lines connecting them, and so on). For software tools that also read and write models in SBML (Systems Biology Markup Language) format, a common need is to store the network diagram together with the SBML representation of the model. This in turn raises the question of how to encode the layout and the rendering of these diagrams. The SBML Level 3 Version 1 Core specification does not provide a mechanism for explicitly encoding diagrams, but it does provide a mechanism for SBML packages to extend the Core specification and add additional syntactical constructs. The Layout package for SBML Level 3 adds the necessary features to SBML so that diagram layouts can be encoded in SBML files, and a companion package called SBML Rendering specifies how the graphical rendering of elements can be encoded. The SBML Layout package is based on the principle that reaction network diagrams should be described as representations of entities such as species and reactions (with direct links to the underlying SBML elements), and not as arbitrary drawings or graphs; for this reason, existing languages for the description of vector drawings (such as SVG) or general graphs (such as GraphML) cannot be used.

  18. The Systems Biology Markup Language (SBML) Level 3 Package: Layout, Version 1 Core.

    PubMed

    Gauges, Ralph; Rost, Ursula; Sahle, Sven; Wengler, Katja; Bergmann, Frank Thomas

    2015-09-04

    Many software tools provide facilities for depicting reaction network diagrams in a visual form. Two aspects of such a visual diagram can be distinguished: the layout (i.e.: the positioning and connections) of the elements in the diagram, and the graphical form of the elements (for example, the glyphs used for symbols, the properties of the lines connecting them, and so on). For software tools that also read and write models in SBML (Systems Biology Markup Language) format, a common need is to store the network diagram together with the SBML representation of the model. This in turn raises the question of how to encode the layout and the rendering of these diagrams. The SBML Level 3 Version 1 Core specification does not provide a mechanism for explicitly encoding diagrams, but it does provide a mechanism for SBML packages to extend the Core specification and add additional syntactical constructs. The Layout package for SBML Level 3 adds the necessary features to SBML so that diagram layouts can be encoded in SBML files, and a companion package called SBML Rendering specifies how the graphical rendering of elements can be encoded. The SBML Layout package is based on the principle that reaction network diagrams should be described as representations of entities such as species and reactions (with direct links to the underlying SBML elements), and not as arbitrary drawings or graphs; for this reason, existing languages for the description of vector drawings (such as SVG) or general graphs (such as GraphML) cannot be used.

  19. Newspaper Design: Desktop Newspaper Design Can Make Staffs Throw Their Hands Up, Give Them the Hands-Down Edge.

    ERIC Educational Resources Information Center

    King, Marianne

    1988-01-01

    Discusses the advantages and disadvantages of using an Apple Macintosh in a high school journalism department. Details the software available in the categories of layout ("Xpress" and "Pagemaker"), word processing ("Microsoft Word"), and graphics ("MacDraw,""Cricket Draw,""MacPaint," and…

  20. 9. Credit JPL. Photographic copy of drawing, engineering drawing showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Credit JPL. Photographic copy of drawing, engineering drawing showing structure of Test Stand 'A' (Building 4202/E-3) and its relationship to the Monitor Building or blockhouse (Building 4203/E-4) when a reinforced concrete machinery room was added to the west side of Test Stand 'A' in 1955. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering 'Electrical Layout - Muroc, Test Stand & Refrigeration Equipment Room,' drawing no. E3/7-0, April 6, 1955. - Jet Propulsion Laboratory Edwards Facility, Test Stand A, Edwards Air Force Base, Boron, Kern County, CA

  1. 39. Photocopy of scale drawing (from Station 'L' office files, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photocopy of scale drawing (from Station 'L' office files, Portland, Oregon) Portland General Electric in house drawing, 5/12/1927 SECTION (TOP) AND ELEVATION (BOTTOM) OF BOILER #9 WHICH IS LOCATED IN THE H.P. BOILER ROOM BUILDING L4, DIAGRAM OF THE GENERAL LAYOUT AND STEAM PIPING OF THE BOILER - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR

  2. 123. Photographic copy of drawing (6 October 1916, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    123. Photographic copy of drawing (6 October 1916, original drawing in Archives, Office of the Building, Administration Building, Sears Roebuck and Company Mail Order Plant, Chicago, Illinois). Drawn by Sears Department 213 (engineer unknown). 1/16 inch to one foot. Partial fourth/fifth floor plan and schematic building section showing the relationship of the gravity conveyors in the warehouse space to the spiral chutes. GENERAL LAYOUT OF ALL MDSE DEPT. CONVEYORS - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  3. A quantum physical design flow using ILP and graph drawing

    NASA Astrophysics Data System (ADS)

    Yazdani, Maryam; Saheb Zamani, Morteza; Sedighi, Mehdi

    2013-10-01

    Implementing large-scale quantum circuits is one of the challenges of quantum computing. One of the central challenges of accurately modeling the architecture of these circuits is to schedule a quantum application and generate the layout while taking into account the cost of communications and classical resources as well as the maximum exploitable parallelism. In this paper, we present and evaluate a design flow for arbitrary quantum circuits in ion trap technology. Our design flow consists of two parts. First, a scheduler takes a description of a circuit and finds the best order for the execution of its quantum gates using integer linear programming regarding the classical resources (qubits) and instruction dependencies. Then a layout generator receives the schedule produced by the scheduler and generates a layout for this circuit using a graph-drawing algorithm. Our experimental results show that the proposed flow decreases the average latency of quantum circuits by about 11 % for a set of attempted benchmarks and by about 9 % for another set of benchmarks compared with the best in literature.

  4. Learning Building Layouts with Non-geometric Visual Information: The Effects of Visual Impairment and Age

    PubMed Central

    Kalia, Amy A.; Legge, Gordon E.; Giudice, Nicholas A.

    2009-01-01

    Previous studies suggest that humans rely on geometric visual information (hallway structure) rather than non-geometric visual information (e.g., doors, signs and lighting) for acquiring cognitive maps of novel indoor layouts. This study asked whether visual impairment and age affect reliance on non-geometric visual information for layout learning. We tested three groups of participants—younger (< 50 years) normally sighted, older (50–70 years) normally sighted, and low vision (people with heterogeneous forms of visual impairment ranging in age from 18–67). Participants learned target locations in building layouts using four presentation modes: a desktop virtual environment (VE) displaying only geometric cues (Sparse VE), a VE displaying both geometric and non-geometric cues (Photorealistic VE), a Map, and a Real building. Layout knowledge was assessed by map drawing and by asking participants to walk to specified targets in the real space. Results indicate that low-vision and older normally-sighted participants relied on additional non-geometric information to accurately learn layouts. In conclusion, visual impairment and age may result in reduced perceptual and/or memory processing that makes it difficult to learn layouts without non-geometric visual information. PMID:19189732

  5. Generating Multi-Destination Maps.

    PubMed

    Zhang, Junsong; Fan, Jiepeng; Luo, Zhenshan

    2017-08-01

    Multi-destination maps are a kind of navigation maps aimed to guide visitors to multiple destinations within a region, which can be of great help to urban visitors. However, they have not been developed in the current online map service. To address this issue, we introduce a novel layout model designed especially for generating multi-destination maps, which considers the global and local layout of a multi-destination map. We model the layout problem as a graph drawing that satisfies a set of hard and soft constraints. In the global layout phase, we balance the scale factor between ROIs. In the local layout phase, we make all edges have good visibility and optimize the map layout to preserve the relative length and angle of roads. We also propose a perturbation-based optimization method to find an optimal layout in the complex solution space. The multi-destination maps generated by our system are potential feasible on the modern mobile devices and our result can show an overview and a detail view of the whole map at the same time. In addition, we perform a user study to evaluate the effectiveness of our method, and the results prove that the multi-destination maps achieve our goals well.

  6. Application of Approximate Pattern Matching in Two Dimensional Spaces to Grid Layout for Biochemical Network Maps

    PubMed Central

    Inoue, Kentaro; Shimozono, Shinichi; Yoshida, Hideaki; Kurata, Hiroyuki

    2012-01-01

    Background For visualizing large-scale biochemical network maps, it is important to calculate the coordinates of molecular nodes quickly and to enhance the understanding or traceability of them. The grid layout is effective in drawing compact, orderly, balanced network maps with node label spaces, but existing grid layout algorithms often require a high computational cost because they have to consider complicated positional constraints through the entire optimization process. Results We propose a hybrid grid layout algorithm that consists of a non-grid, fast layout (preprocessor) algorithm and an approximate pattern matching algorithm that distributes the resultant preprocessed nodes on square grid points. To demonstrate the feasibility of the hybrid layout algorithm, it is characterized in terms of the calculation time, numbers of edge-edge and node-edge crossings, relative edge lengths, and F-measures. The proposed algorithm achieves outstanding performances compared with other existing grid layouts. Conclusions Use of an approximate pattern matching algorithm quickly redistributes the laid-out nodes by fast, non-grid algorithms on the square grid points, while preserving the topological relationships among the nodes. The proposed algorithm is a novel use of the pattern matching, thereby providing a breakthrough for grid layout. This application program can be freely downloaded from http://www.cadlive.jp/hybridlayout/hybridlayout.html. PMID:22679486

  7. Application of approximate pattern matching in two dimensional spaces to grid layout for biochemical network maps.

    PubMed

    Inoue, Kentaro; Shimozono, Shinichi; Yoshida, Hideaki; Kurata, Hiroyuki

    2012-01-01

    For visualizing large-scale biochemical network maps, it is important to calculate the coordinates of molecular nodes quickly and to enhance the understanding or traceability of them. The grid layout is effective in drawing compact, orderly, balanced network maps with node label spaces, but existing grid layout algorithms often require a high computational cost because they have to consider complicated positional constraints through the entire optimization process. We propose a hybrid grid layout algorithm that consists of a non-grid, fast layout (preprocessor) algorithm and an approximate pattern matching algorithm that distributes the resultant preprocessed nodes on square grid points. To demonstrate the feasibility of the hybrid layout algorithm, it is characterized in terms of the calculation time, numbers of edge-edge and node-edge crossings, relative edge lengths, and F-measures. The proposed algorithm achieves outstanding performances compared with other existing grid layouts. Use of an approximate pattern matching algorithm quickly redistributes the laid-out nodes by fast, non-grid algorithms on the square grid points, while preserving the topological relationships among the nodes. The proposed algorithm is a novel use of the pattern matching, thereby providing a breakthrough for grid layout. This application program can be freely downloaded from http://www.cadlive.jp/hybridlayout/hybridlayout.html.

  8. 7. Photograph of a line drawing. 'PART III, SECTION 1, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photograph of a line drawing. 'PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDING NO. 10, PRODUCER GAS & EXHAUSTER BLDG., PLANT A.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant A, Parts I, II, III. (Nashville, TN: Office of District Engineer, 1944). - Holston Army Ammunition Plant, Producer Gas Plant, Kingsport, Sullivan County, TN

  9. Automatic metro map layout using multicriteria optimization.

    PubMed

    Stott, Jonathan; Rodgers, Peter; Martínez-Ovando, Juan Carlos; Walker, Stephen G

    2011-01-01

    This paper describes an automatic mechanism for drawing metro maps. We apply multicriteria optimization to find effective placement of stations with a good line layout and to label the map unambiguously. A number of metrics are defined, which are used in a weighted sum to find a fitness value for a layout of the map. A hill climbing optimizer is used to reduce the fitness value, and find improved map layouts. To avoid local minima, we apply clustering techniques to the map-the hill climber moves both stations and clusters when finding improved layouts. We show the method applied to a number of metro maps, and describe an empirical study that provides some quantitative evidence that automatically-drawn metro maps can help users to find routes more efficiently than either published maps or undistorted maps. Moreover, we have found that, in these cases, study subjects indicate a preference for automatically-drawn maps over the alternatives. © 2011 IEEE Published by the IEEE Computer Society

  10. 48 CFR 552.270-14 - Changes.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following: (1) Specifications (including drawings and designs). (2) Work or services. (3) Facilities or space layout. (4) Amount of space, provided the Lessor consents to the change. (b) If any such change...

  11. 48 CFR 552.270-14 - Changes.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... following: (1) Specifications (including drawings and designs). (2) Work or services. (3) Facilities or space layout. (4) Amount of space, provided the Lessor consents to the change. (b) If any such change...

  12. 48 CFR 552.270-14 - Changes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following: (1) Specifications (including drawings and designs). (2) Work or services. (3) Facilities or space layout. (4) Amount of space, provided the Lessor consents to the change. (b) If any such change...

  13. 48 CFR 552.270-14 - Changes.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... following: (1) Specifications (including drawings and designs). (2) Work or services. (3) Facilities or space layout. (4) Amount of space, provided the Lessor consents to the change. (b) If any such change...

  14. 48 CFR 552.270-14 - Changes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... following: (1) Specifications (including drawings and designs). (2) Work or services. (3) Facilities or space layout. (4) Amount of space, provided the Lessor consents to the change. (b) If any such change...

  15. An interactive wire-wrap board layout program

    NASA Technical Reports Server (NTRS)

    Schlutsmeyer, A.

    1987-01-01

    An interactive computer-graphics-based tool for specifying the placement of electronic parts on a wire-wrap circuit board is presented. Input is a data file (currently produced by a commercial logic design system) which describes the parts used and their interconnections. Output includes printed reports describing the parts and wire paths, parts counts, placement lists, board drawing, and a tape to send to the wire-wrap vendor. The program should reduce the engineer's layout time by a factor of 3 to 5 as compared to manual methods.

  16. Methods of visualizing graphs

    DOEpatents

    Wong, Pak C.; Mackey, Patrick S.; Perrine, Kenneth A.; Foote, Harlan P.; Thomas, James J.

    2008-12-23

    Methods for visualizing a graph by automatically drawing elements of the graph as labels are disclosed. In one embodiment, the method comprises receiving node information and edge information from an input device and/or communication interface, constructing a graph layout based at least in part on that information, wherein the edges are automatically drawn as labels, and displaying the graph on a display device according to the graph layout. In some embodiments, the nodes are automatically drawn as labels instead of, or in addition to, the label-edges.

  17. 14 CFR 151.131 - Forms.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... proposal for the development of an airport layout plan or plans, or both, designed to lead to a project... usable airport facility shown on an airport layout plan developed under the proposal, or initiate the... designed to lead to a project application, or both, within three years after the date of acceptance of the...

  18. 14 CFR 151.131 - Forms.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... proposal for the development of an airport layout plan or plans, or both, designed to lead to a project... usable airport facility shown on an airport layout plan developed under the proposal, or initiate the... designed to lead to a project application, or both, within three years after the date of acceptance of the...

  19. 14 CFR 151.131 - Forms.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... proposal for the development of an airport layout plan or plans, or both, designed to lead to a project... usable airport facility shown on an airport layout plan developed under the proposal, or initiate the... designed to lead to a project application, or both, within three years after the date of acceptance of the...

  20. 14 CFR 151.131 - Forms.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... proposal for the development of an airport layout plan or plans, or both, designed to lead to a project... usable airport facility shown on an airport layout plan developed under the proposal, or initiate the... designed to lead to a project application, or both, within three years after the date of acceptance of the...

  1. 14 CFR 151.131 - Forms.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... proposal for the development of an airport layout plan or plans, or both, designed to lead to a project... usable airport facility shown on an airport layout plan developed under the proposal, or initiate the... designed to lead to a project application, or both, within three years after the date of acceptance of the...

  2. BioTapestry now provides a web application and improved drawing and layout tools

    PubMed Central

    Paquette, Suzanne M.; Leinonen, Kalle; Longabaugh, William J.R.

    2016-01-01

    Gene regulatory networks (GRNs) control embryonic development, and to understand this process in depth, researchers need to have a detailed understanding of both the network architecture and its dynamic evolution over time and space. Interactive visualization tools better enable researchers to conceptualize, understand, and share GRN models. BioTapestry is an established application designed to fill this role, and recent enhancements released in Versions 6 and 7 have targeted two major facets of the program. First, we introduced significant improvements for network drawing and automatic layout that have now made it much easier for the user to create larger, more organized network drawings. Second, we revised the program architecture so it could continue to support the current Java desktop Editor program, while introducing a new BioTapestry GRN Viewer that runs as a JavaScript web application in a browser. We have deployed a number of GRN models using this new web application. These improvements will ensure that BioTapestry remains viable as a research tool in the face of the continuing evolution of web technologies, and as our understanding of GRN models grows. PMID:27134726

  3. BioTapestry now provides a web application and improved drawing and layout tools.

    PubMed

    Paquette, Suzanne M; Leinonen, Kalle; Longabaugh, William J R

    2016-01-01

    Gene regulatory networks (GRNs) control embryonic development, and to understand this process in depth, researchers need to have a detailed understanding of both the network architecture and its dynamic evolution over time and space. Interactive visualization tools better enable researchers to conceptualize, understand, and share GRN models. BioTapestry is an established application designed to fill this role, and recent enhancements released in Versions 6 and 7 have targeted two major facets of the program. First, we introduced significant improvements for network drawing and automatic layout that have now made it much easier for the user to create larger, more organized network drawings. Second, we revised the program architecture so it could continue to support the current Java desktop Editor program, while introducing a new BioTapestry GRN Viewer that runs as a JavaScript web application in a browser. We have deployed a number of GRN models using this new web application. These improvements will ensure that BioTapestry remains viable as a research tool in the face of the continuing evolution of web technologies, and as our understanding of GRN models grows.

  4. 38. Photograph of a line drawing. 'PART III, SECTION 1, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photograph of a line drawing. 'PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS G-1 TO G-10 INCL., PURIFICATION, MANUFACTURING AREA, PLAN 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  5. 43. Photograph of a line drawing. 'PART III, SECTION 1, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. Photograph of a line drawing. 'PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS H-1 TO H-10 INCL., GRINDING, MANUFACTURING AREA, PLANT 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  6. ADM. Administration Building (TAN602). Early room layout, door and room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ADM. Administration Building (TAN-602). Early room layout, door and room schedules. Ralph M. Parsons 902-2-ANP-602-A 31. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 033-0602-00-693-106710 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  7. 7 CFR 1753.47 - Plans and specifications (P&S).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the Loan Design (LD) shall be revised to reflect any needed changes (See § 1753.3). (ii) Deviations... units and guide drawings, if any. (4) Key, detail, and cable layout maps. (5) RUS Contract Form 787...

  8. 7 CFR 1753.47 - Plans and specifications (P&S).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the Loan Design (LD) shall be revised to reflect any needed changes (See § 1753.3). (ii) Deviations... units and guide drawings, if any. (4) Key, detail, and cable layout maps. (5) RUS Contract Form 787...

  9. 7 CFR 1753.47 - Plans and specifications (P&S).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the Loan Design (LD) shall be revised to reflect any needed changes (See § 1753.3). (ii) Deviations... units and guide drawings, if any. (4) Key, detail, and cable layout maps. (5) RUS Contract Form 787...

  10. 7 CFR 1753.47 - Plans and specifications (P&S).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the Loan Design (LD) shall be revised to reflect any needed changes (See § 1753.3). (ii) Deviations... units and guide drawings, if any. (4) Key, detail, and cable layout maps. (5) RUS Contract Form 787...

  11. 7 CFR 1753.47 - Plans and specifications (P&S).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the Loan Design (LD) shall be revised to reflect any needed changes (See § 1753.3). (ii) Deviations... units and guide drawings, if any. (4) Key, detail, and cable layout maps. (5) RUS Contract Form 787...

  12. An efficient grid layout algorithm for biological networks utilizing various biological attributes

    PubMed Central

    Kojima, Kaname; Nagasaki, Masao; Jeong, Euna; Kato, Mitsuru; Miyano, Satoru

    2007-01-01

    Background Clearly visualized biopathways provide a great help in understanding biological systems. However, manual drawing of large-scale biopathways is time consuming. We proposed a grid layout algorithm that can handle gene-regulatory networks and signal transduction pathways by considering edge-edge crossing, node-edge crossing, distance measure between nodes, and subcellular localization information from Gene Ontology. Consequently, the layout algorithm succeeded in drastically reducing these crossings in the apoptosis model. However, for larger-scale networks, we encountered three problems: (i) the initial layout is often very far from any local optimum because nodes are initially placed at random, (ii) from a biological viewpoint, human layouts still exceed automatic layouts in understanding because except subcellular localization, it does not fully utilize biological information of pathways, and (iii) it employs a local search strategy in which the neighborhood is obtained by moving one node at each step, and automatic layouts suggest that simultaneous movements of multiple nodes are necessary for better layouts, while such extension may face worsening the time complexity. Results We propose a new grid layout algorithm. To address problem (i), we devised a new force-directed algorithm whose output is suitable as the initial layout. For (ii), we considered that an appropriate alignment of nodes having the same biological attribute is one of the most important factors of the comprehension, and we defined a new score function that gives an advantage to such configurations. For solving problem (iii), we developed a search strategy that considers swapping nodes as well as moving a node, while keeping the order of the time complexity. Though a naïve implementation increases by one order, the time complexity, we solved this difficulty by devising a method that caches differences between scores of a layout and its possible updates. Conclusion Layouts of the new grid layout algorithm are compared with that of the previous algorithm and human layout in an endothelial cell model, three times as large as the apoptosis model. The total cost of the result from the new grid layout algorithm is similar to that of the human layout. In addition, its convergence time is drastically reduced (40% reduction). PMID:17338825

  13. Using a 3D CAD plant model to simplify process hazard reviews

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tolpa, G.

    A Hazard and Operability (HAZOP) review is a formal predictive procedure used to identify potential hazard and operability problems associated with certain processes and facilities. The HAZOP procedure takes place several times during the life cycle of the facility. Replacing plastic models, layout and detail drawings with a 3D CAD electronic model, provides access to process safety information and a detailed level of plant topology that approaches the visualization capability of the imagination. This paper describes the process that is used for adding the use of a 3D CAD model to flowsheets and proven computer programs for the conduct ofmore » hazard and operability reviews. Using flowsheets and study nodes as a road map for the review the need for layout and other detail drawings is all but eliminated. Using the 3D CAD model again for a post-P and ID HAZOP supports conformance to layout and safety requirements, provides superior visualization of the plant configuration and preserves the owners equity in the design. The response from the review teams are overwhelmingly in favor of this type of review over a review that uses only drawings. Over the long term the plant model serves more than just process hazards analysis. Ongoing use of the model can satisfy the required access to process safety information, OHSA documentation and other legal requirements. In this paper extensive instructions address the logic for the process hazards analysis and the preparation required to assist anyone who wishes to add the use of a 3D model to their review.« less

  14. 30. Photograph of a line drawing. 'CROSS SECTION OF PART ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Photograph of a line drawing. 'CROSS SECTION OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS D-1 TO D-10 INCL., NITRATION, MANUFACTURING AREA, PLANT 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  15. General layout of reactor and control areas upon advent of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    General layout of reactor and control areas upon advent of power burst facility (PBF). Shows relationship of PBF to SPERT-I, -II, -III, and -IV. Ebasco Services 1205-PER/PBF-U-102. Date: July 1965. INEEL index no. 761-0100-00-205-123006 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  16. Music Facilities.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    The layouts and specifications in this booklet are intended to assist those involved in planning music facilities for elementary and secondary schools. Drawings, room plans, and text illustrate specifications for location; space relationship; combined and separate instrumental and vocal rooms; practice rooms; and auxiliary areas. Particular…

  17. IET exhaust gas duct, system layout, plan, and section. shows ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET exhaust gas duct, system layout, plan, and section. shows mounting brackets, concrete braces, divided portion of duct, other details. Ralph M. Parsons 902-5-ANP-712-S 429. Date: May 1954. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0712-60-693-106980 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  18. 30 CFR 18.80 - Approval of machines assembled with certified or explosion-proof components.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... approved machines will be accepted in lieu of certified components. (b) A single layout drawing (see Figure... approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10...

  19. Technical and Occupational Shops. Volume II.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    The layouts and specifications provided are intended as a guide to school boards, educators, and architects. Drawings and room plans illustrate specifications for girls' occupational shop, graphic arts, carpentry (millwork and building construction shop), boys' occupational shop (mechanical), boys' occupational shop (building construction),…

  20. 42. Photograph of a line drawing. 'CROSS SECTION AND PLAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photograph of a line drawing. 'CROSS SECTION AND PLAN LAYOUT OF PART I, SECTION 8, BUILDINGS NO. H-1 TO H-10 INCL., GRINDING, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (NashVille, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  1. Proceedings of the 1983 SPC/IREAPS Technical Symposium: Volume 1, Improving Shipbuilding Productivity. Held in Boston, MA on 23-25 August 1983

    DTIC Science & Technology

    1983-08-25

    currently available Westinghouse CAE capabilities include plant layout, piping design, piping analysis , support/hanger design, and drawing preparation. The...considerations involved with the design and analysis of piping and support systems and space management in nuclear power plants are very similar to...piping analysis system can obtain input defini- tion data either from the plant modeling system or from piping drawings (for systems not designed using

  2. Design data brochure for CSI series V solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Generalized information on system configuration, system sizing, and mechanical layout is presented to assist the architect or designer in preparing construction drawings and specifications for the installation of the CSI integrated solar heating systems. Efficiency in space utilization of a full length collector and the importance of proper sizing of the collector array are among the topics discussed. Details of storage and transport subsystems are provided along with drawings and specifications of all components of the CSI system.

  3. 29. Photograph of a line drawing. 'CROSS SECTION AND PLAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photograph of a line drawing. 'CROSS SECTION AND PLAN LAYOUT OF PART I, SECTION 8, BUILDINGS NO. D-1 TO D-10 INCL., NITRATION, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  4. Measurement of bridge deck layout prior to concrete placement : final report.

    DOT National Transportation Integrated Search

    2017-01-01

    The main objective of this research was to develop a method of measuring and : producing as built bridge drawings. This was the first step in the feasibility : assessment for automated bridge deck paving. The research goes to show the : standard meth...

  5. Alcoa wind turbines

    NASA Technical Reports Server (NTRS)

    Ai, D. K.

    1979-01-01

    An overview of Alcoa's wind energy program is given with emphasis on the the development of a low cost, reliable Darrieus Vertical Axis Wind Turbine System. The design layouts and drawings for fabrication are now complete, while fabrication and installation to utilize the design are expected to begin shortly.

  6. Young Children's Use of Surface and Object Information in Drawings of Everyday Scenes.

    PubMed

    Dillon, Moira R; Spelke, Elizabeth S

    2017-09-01

    Pictorial symbols such as photographs, drawings, and maps are ubiquitous in modern cultures. Nevertheless, it remains unclear how children relate these symbols to the scenes that they represent. The present work investigates 4-year-old children's (N = 144) sensitivity to extended surface layouts and objects when using drawings of a room to find locations in that room. Children used either extended surfaces or objects when interpreting drawings, but they did not combine these two types of information to disambiguate target locations. Moreover, children's evaluations of drawings depicting surfaces or objects did not align with their use of such information in those drawings. These findings suggest that pictures of all kinds serve as media in which children deploy symbolic spatial skills flexibly and automatically. © 2016 The Authors. Child Development © 2016 Society for Research in Child Development, Inc.

  7. 76 FR 28925 - Tribal Veterans Cemetery Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-19

    ... means the process of site selection, land acquisition, design and planning, earth moving, landscaping... space, or functional layout; and it will not enter into a construction contract for the project or... State or Tribal Organization and the design team to provide a standard for preparation of drawings...

  8. Commercial Art I and Commercial Art II: An Instructional Guide.

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, Rockville, MD.

    A teacher's guide for two sequential one-year commercial art courses for high school students is presented. Commercial Art I contains three units: visual communication, product design, and environmental design. Students study visual communication by analyzing advertising techniques, practicing fundamental drawing and layout techniques, creating…

  9. Kids Writing Comic Books: Lessons from the Professionals.

    ERIC Educational Resources Information Center

    Chilcoat, George W.; And Others

    1991-01-01

    Provides tips for comic book writing that have been gathered from actual comic book authors and can be used in minilessons for writing workshops in the classroom. Focuses on five specific components of comic book writing: plot development, layout, drawing, narration, and the cover page. (MG)

  10. Living aboard the Space Shuttle

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The crew habitat of the Space Shuttle is briefly characterized. Subjects discussed include the overall layout of the crew quarters; the air-purification and climate-control facilities; menus and food-preparation techniques; dishwashing, laundry, toilet, bathing, and shaving procedures; and recreation and sleeping accommodations. Drawings and a photograph are provided.

  11. A Tight Fit.

    ERIC Educational Resources Information Center

    Williamson, Susan

    1999-01-01

    Describes the campus design of the University of Houston (Texas) as an example of an urban campus where space is limited; the siting of new buildings was straightforward; and the planning focused on the campus' identity, accessibility, and enhancement. Two drawings of the campus layout from the master plan are included. (GR)

  12. A&M. TAN633. Utilities plan and profiles. Layout of TAN633 in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. TAN-633. Utilities plan and profiles. Layout of TAN-633 in relation to neighboring buildings: actuator building, pool building, water filter building, liquid waste treatment plant, and buried storage tanks. Ralph M. Parsons 1229-13-ANP/GE-3-301-U-1. Date: December 1956. INEEL index code no. 034-0301-00-693-107311 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  13. Electro-optic architecture for servicing sensors and actuators in advanced aircraft propulsion systems

    NASA Technical Reports Server (NTRS)

    Poppel, G. L.; Glasheen, W. M.

    1989-01-01

    A detailed design of a fiber optic propulsion control system, integrating favored sensors and electro-optics architecture is presented. Layouts, schematics, and sensor lists describe an advanced fighter engine system model. Components and attributes of candidate fiber optic sensors are identified, and evaluation criteria are used in a trade study resulting in favored sensors for each measurand. System architectural ground rules were applied to accomplish an electro-optics architecture for the favored sensors. A key result was a considerable reduction in signal conductors. Drawings, schematics, specifications, and printed circuit board layouts describe the detailed system design, including application of a planar optical waveguide interface.

  14. 40 CFR 35.2040 - Grant application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: (a) Step 2+3: Combined design and building of a treatment works and building related services and... limitations on award (§§ 35.2100 through 35.2127); (5) Final design drawings and specifications; (6) The..., a preliminary layout of the distribution and drainage systems, and an explanation of the intended...

  15. 40 CFR 35.2040 - Grant application.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: (a) Step 2+3: Combined design and building of a treatment works and building related services and... limitations on award (§§ 35.2100 through 35.2127); (5) Final design drawings and specifications; (6) The..., a preliminary layout of the distribution and drainage systems, and an explanation of the intended...

  16. 40 CFR 35.2040 - Grant application.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...: (a) Step 2+3: Combined design and building of a treatment works and building related services and... limitations on award (§§ 35.2100 through 35.2127); (5) Final design drawings and specifications; (6) The..., a preliminary layout of the distribution and drainage systems, and an explanation of the intended...

  17. 40 CFR 35.2040 - Grant application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...: (a) Step 2+3: Combined design and building of a treatment works and building related services and... limitations on award (§§ 35.2100 through 35.2127); (5) Final design drawings and specifications; (6) The..., a preliminary layout of the distribution and drainage systems, and an explanation of the intended...

  18. 40 CFR 35.2040 - Grant application.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...: (a) Step 2+3: Combined design and building of a treatment works and building related services and... limitations on award (§§ 35.2100 through 35.2127); (5) Final design drawings and specifications; (6) The..., a preliminary layout of the distribution and drainage systems, and an explanation of the intended...

  19. Heat source reentry vehicle design study

    NASA Technical Reports Server (NTRS)

    Ryan, R. L.

    1971-01-01

    The design details are presented of a flight-type heat source reentry vehicle and heat exchanger compatible with the isotope Brayton power conversion system. The reference reentry vehicle and heat exchanger were modified, orbital and superorbital capability was assessed, and a complete set of detail design layout drawings were provided.

  20. Magnetic bearings for a high-performance optical disk buffer, volume 2

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The operating instructions for the magnetic bearings of a high-performance optical disk buffer are provided. Among the topics that are discussed are the following: front panel layout, turn-on procedure, shut-down procedure, and latch-up protection. Additionally, comprehensive engineering drawings are presented for the design.

  1. Basic Drafting: Book One.

    ERIC Educational Resources Information Center

    Davis, Ronald; And Others

    The first of a two-book course in drafting, this manual consists of 13 topics in the following units: introduction to drafting, general safety, basic tools and lines, major equipment, applying for a job, media, lettering, reproduction, drawing sheet layout, architect's scale usage, civil engineer's scale usage, mechanical engineer's scale usage,…

  2. Machine Shop Projects. Instructor Guide. General Information.

    ERIC Educational Resources Information Center

    Westbrook, Raymond E.

    Developed in Georgia, this manual contains 101 projects for use in machine shop courses, arranged according to a suggested machine shop curriculum. Each project, included in a student workbook, contains complete drawings and instructions for implementation. Tasks are listed under the broad headings of measuring, layout, bench work, saws, drilling,…

  3. MONTHLY PROGRESS REPORT ON THE FEASIBILITY AND DESIGN STUDY FOR COLLECTIVE PROTECTION EQUIPMENT FOR THE AN/MSG-4 SYSTEM. PHASEIA. Technical Report, April 15 to May 30, 1962 (1st Report). Financial Report, April 15 to May 30, 1962 (1st Report). GSG Report No. 1663.00/54

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glaser, J.

    1962-06-19

    Initial efforts devoted to development of layout drawings of the protective equipment from which detailed fabrication drawings are to be established are reported. Collective protection equipment design progress is reported on 400- and 800-cfm filter units and on protective entrances for shelters and vehicles. (J.R.D.)

  4. Drawings of the Modular Equipment Transporter and Hand Tool Carrier

    NASA Image and Video Library

    1970-10-12

    S70-50762 (November 1970) --- A line drawing illustrating layout view of the modular equipment transporter (MET) and its equipment. A MET (or Rickshaw, as it has been nicknamed) will be used on the lunar surface for the first time during the Apollo 14 lunar landing mission. The Rickshaw will serve as a portable workbench with a place for the Apollo lunar hand tools (ALHT) and their carrier, three cameras, two sample container bags, a special environment sample container (SESC), a lunar portable magnetometer (LPM) and spare film magazines.

  5. 9. Photographic copy of drawing dated June 24, 1908 (Source: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photographic copy of drawing dated June 24, 1908 (Source: Salt River Project) Transformer house, general drawing - Theodore Roosevelt Dam, Transformer House, Salt River, Tortilla Flat, Maricopa County, AZ

  6. 7 CFR Exhibit C to Subpart C of... - Checklist of Visual Exhibits and Documentation for RRH, RCH, and LH Proposals

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... design drawings showing the proposed plot plan, typical unit plans, and elevations. If available, the... locations with profiles and widths, lot layouts, major drainageways, and other development planned... the Obligation of Funds. All decisions regarding the conceptual design of the proposed project should...

  7. 7 CFR Exhibit C to Subpart C of... - Checklist of Visual Exhibits and Documentation for RRH, RCH, and LH Proposals

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... design drawings showing the proposed plot plan, typical unit plans, and elevations. If available, the... locations with profiles and widths, lot layouts, major drainageways, and other development planned... the Obligation of Funds. All decisions regarding the conceptual design of the proposed project should...

  8. Welder: Apprenticeship Course Outline. Apprenticeship and Industry Training. 1207.1

    ERIC Educational Resources Information Center

    Alberta Advanced Education and Technology, 2007

    2007-01-01

    The graduate of the Welder apprenticeship program is a certified journeyperson who will be able to: (1) be skillful in the fusing of metals using prescribed welding applications; (2) have a working knowledge of the welding equipment involved with the various welding procedures; (3) comprehend drawings and develop layout patterns for projects and…

  9. 21. Photographic contact print from a 8x10 original negative. (Original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photographic contact print from a 8x10 original negative. (Original drawing located on abandoned NASA site, currently owned by the City of Downey, Downey, California). 1954 NORTH AMERICAN AVIATION BUILDING 41 CONSTRUCTION LAYOUT. - NASA Industrial Plant, Missile Research Laboratory, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  10. Process development for automated solar cell and module production. Task 4: Automated array assembly

    NASA Technical Reports Server (NTRS)

    Hagerty, J. J.

    1981-01-01

    The cell preparation station was installed in its new enclosure. Operation verification tests were performed. The detailed layout drawings of the automated lamination station were produced and construction began. All major and most minor components were delivered by vendors. The station framework was built and assembly of components begun.

  11. Container Design and Packaging; Art Education: 6693.13.

    ERIC Educational Resources Information Center

    Dubocq, Edward R.

    Offered as an exploratory course in the highly technical field of container and packaging design, emphasis is placed on refined knowledge of the basic techniques used in preparing visuals, color camps, and working drawings. Study of related information such as consumer psychology and color, layout, and lettering is included in this studio oriented…

  12. [The validation of the parameters for a basic model of a power supply layout for general x-ray diagnostic apparatus].

    PubMed

    Blinov, N N

    2000-01-01

    Specifications for the main element of a modern X-ray diagnostic device an X-ray feeder are formulated. There is evidence for choosing its parameters. The new rational routine of X-ray study and the layout of a X-ray room are proposed. Information on the up-to-date commercially manufactured basic medium-frequency general-purpose X-ray feeder "URP-30 SCh Amico" is given.

  13. Camera Layout Design for the Upper Stage Thrust Cone

    NASA Technical Reports Server (NTRS)

    Wooten, Tevin; Fowler, Bart

    2010-01-01

    Engineers in the Integrated Design and Analysis Division (EV30) use a variety of different tools to aid in the design and analysis of the Ares I vehicle. One primary tool in use is Pro-Engineer. Pro-Engineer is a computer-aided design (CAD) software that allows designers to create computer generated structural models of vehicle structures. For the Upper State thrust cone, Pro-Engineer was used to assist in the design of a layout for two camera housings. These cameras observe the separation between the first and second stage of the Ares I vehicle. For the Ares I-X, one standard speed camera was used. The Ares I design calls for two separate housings, three cameras, and a lighting system. With previous design concepts and verification strategies in mind, a new layout for the two camera design concept was developed with members of the EV32 team. With the new design, Pro-Engineer was used to draw the layout to observe how the two camera housings fit with the thrust cone assembly. Future analysis of the camera housing design will verify the stability and clearance of the camera with other hardware present on the thrust cone.

  14. Rasch family models in e-learning: analyzing architectural sketching with a digital pen.

    PubMed

    Scalise, Kathleen; Cheng, Nancy Yen-Wen; Oskui, Nargas

    2009-01-01

    Since architecture students studying design drawing are usually assessed qualitatively on the basis of their final products, the challenges and stages of their learning have remained masked. To clarify the challenges in design drawing, we have been using the BEAR Assessment System and Rasch family models to measure levels of understanding for individuals and groups, in order to correct pedagogical assumptions and tune teaching materials. This chapter discusses the analysis of 81 drawings created by architectural students to solve a space layout problem, collected and analyzed with digital pen-and-paper technology. The approach allows us to map developmental performance criteria and perceive achievement overlaps in learning domains assumed separate, and then re-conceptualize a three-part framework to represent learning in architectural drawing. Results and measurement evidence from the assessment and Rasch modeling are discussed.

  15. 14. Photocopy of engineering drawing (original drawing, #MH 10460086, dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photocopy of engineering drawing (original drawing, #MH 104-600-86, dated October 31, 1995, and drawn by W. Robinson, is located in the Mountain Home Air Force Base Civil Engineering archives). - Mountain Home Air Force Base, Base Chapel, 350 Willow Street, Cantonment Area, Mountain Home, Elmore County, ID

  16. Photocopy of engineering drawing dated June 30, 1944. (Original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of engineering drawing dated June 30, 1944. (Original drawing located in Command Historian's Archives, Naval Facilities Engineering Command, Port Hueneme, California. SITE PLAN OF ROOSEVELT BASE, JUNE 30, 1944 - Roosevelt Base, Bounded by Ocean Boulevard, Pennsylvania Avenue, Richardson Avenue, & Idaho Street, Long Beach, Los Angeles County, CA

  17. 76 FR 33166 - Defense Federal Acquisition Regulation Supplement (DFARS); Warranty Tracking of Serialized Items...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... Acquisition, Technology and Logistics dated February 6, 2007, which required definition of the requirements to... Defense for Acquisition, Technology and Logistics issued a policy memorandum dated February 6, 2007, which... Changes Required During the final rule development, DoD restructured the layout of the rule to reduce...

  18. 13. Photocopy of engineering drawing (original drawing,(original drawing, #MH 10460086, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photocopy of engineering drawing (original drawing,(original drawing, #MH 104-600-86, dated October 31, 1995, and drawn by W. Robinson, is located in the Mountain Home Air Force Base Civil Engineering archives. This 1995 drawing is a copy of drawing #MH 104-600-06, dated December 21, 1955, entitled "Repair Exterior Siding Elev. & Exterior Painting. Bldg. 611," also located in the Mountain Home Air Force Base Civil Engineering archives). FAC 611. - Mountain Home Air Force Base, Base Chapel, 350 Willow Street, Cantonment Area, Mountain Home, Elmore County, ID

  19. Girls in detail, boys in shape: gender differences when drawing cubes in depth.

    PubMed

    Lange-Küttner, C; Ebersbach, M

    2013-08-01

    The current study tested gender differences in the developmental transition from drawing cubes in two- versus three dimensions (3D), and investigated the underlying spatial abilities. Six- to nine-year-old children (N = 97) drew two occluding model cubes and solved several other spatial tasks. Girls more often unfolded the various sides of the cubes into a layout, also called diagrammatic cube drawing (object design detail). In girls, the best predictor for drawing the cubes was Mental Rotation Test (MRT) accuracy. In contrast, boys were more likely to preserve the optical appearance of the cube array. Their drawing in 3D was best predicted by MRT reaction time and the Embedded Figures Test (EFT). This confirmed boys' stronger focus on the contours of an object silhouette (object shape). It is discussed whether the two gender-specific approaches to drawing in three dimensions reflect two sides of the appearance-reality distinction in drawing, that is graphic syntax of object design features versus visual perception of projective space. © 2012 The British Psychological Society.

  20. Graph-drawing algorithms geometries versus molecular mechanics in fullereness

    NASA Astrophysics Data System (ADS)

    Kaufman, M.; Pisanski, T.; Lukman, D.; Borštnik, B.; Graovac, A.

    1996-09-01

    The algorithms of Kamada-Kawai (KK) and Fruchterman-Reingold (FR) have been recently generalized (Pisanski et al., Croat. Chem. Acta 68 (1995) 283) in order to draw molecular graphs in three-dimensional space. The quality of KK and FR geometries is studied here by comparing them with the molecular mechanics (MM) and the adjacency matrix eigenvectors (AME) algorithm geometries. In order to compare different layouts of the same molecule, an appropriate method has been developed. Its application to a series of experimentally detected fullerenes indicates that the KK, FR and AME algorithms are able to reproduce plausible molecular geometries.

  1. Getting the Big Picture: Development of Spatial Scaling Abilities

    ERIC Educational Resources Information Center

    Frick, Andrea; Newcombe, Nora S.

    2012-01-01

    Spatial scaling is an integral aspect of many spatial tasks that involve symbol-to-referent correspondences (e.g., map reading, drawing). In this study, we asked 3-6-year-olds and adults to locate objects in a two-dimensional spatial layout using information from a second spatial representation (map). We examined how scaling factor and reference…

  2. 56. Photocopy of Mechanical drawing, dated August 6, 1976 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. Photocopy of Mechanical drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. H-12 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - EQUIPMENT ROOM PLANS. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  3. 53. Photocopy of Structural drawing, dated August 6, 1976 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. Photocopy of Structural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. S-4 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - FIRST FLOOR PLAN. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  4. 55. Photocopy of Structural drawing, dated August 6, 1976 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. Photocopy of Structural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. S-15 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - UTILITY BUILDING. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  5. 54. Photocopy of Structural drawing, dated August 6, 1976 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. Photocopy of Structural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. S-14 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - ARRAY DETAILS. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  6. 5. Photographic copy of construction drawing, dated December 13, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of construction drawing, dated December 13, 1933, Construction Service QMC, Office of the Constructing Quartermaster, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ELEVATIONS AND PLAN, PLAN NO. 6658-1, DRAWING 6658-1, DRAWING 6658-242. - Selfridge Field, Building No. 156, Railroad Avenue at North Jefferson Avenue, Mount Clemens, Macomb County, MI

  7. 394. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    394. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; PIERS E-2, E-3, E-4, E-5; PLANT LAYOUT AND CAISSON ANCHORAGES; DRG. NO.51 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  8. Human factors issues and approaches in the spatial layout of a space station control room, including the use of virtual reality as a design analysis tool

    NASA Technical Reports Server (NTRS)

    Hale, Joseph P., II

    1994-01-01

    Human Factors Engineering support was provided for the 30% design review of the late Space Station Freedom Payload Control Area (PCA). The PCA was to be the payload operations control room, analogous to the Spacelab Payload Operations Control Center (POCC). This effort began with a systematic collection and refinement of the relevant requirements driving the spatial layout of the consoles and PCA. This information was used as input for specialized human factors analytical tools and techniques in the design and design analysis activities. Design concepts and configuration options were developed and reviewed using sketches, 2-D Computer-Aided Design (CAD) drawings, and immersive Virtual Reality (VR) mockups.

  9. 19. Photocopy of Mechanical drawing, dated 25 June, 1993 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of Mechanical drawing, dated 25 June, 1993 by US Air Force Space Command. Original drawing property of United States Air Force, 21" Space Command. U-l PAVE PAWS SUPPORT SYSTEMS, CAPE COD AFB, MASSACHUSETTS - UTILITY SITE PLAN. DRAWING NO. U-l - SHEET 17 OF 21. - Cape Cod Air Station, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  10. 50. Photocopy of Architectural drawing, dated August 6, 1976 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. A-5 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - FOURTH FLOOR AND PLATFORM 4A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  11. 52. Photocopy of Architectural drawing, dated August 6, 1976 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21' Space Command. A-10 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - ELEVATION A, B AND C. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  12. 51. Photocopy of Architectural drawing, dated August 6, 1976 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. A-6 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - FIFTH FLOOR AND PLATFORM 5A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  13. 49. Photocopy of Architectural drawing, dated August 6, 1976 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. A-4 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - THIRD FLOOR AND PLATFORM 3A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  14. 76 FR 67163 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Massachusetts Electric Company submits tariff filing per 35.12: Pioneer Valley Design & Preliminary Engineering Agreement for Switchyard Layout to be effective 10/20/2011. Filed Date: 10/19/2011. Accession Number...

  15. 9. Photocopy of original construction drawing, dated February 1932 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of original construction drawing, dated February 1932 (original print in possession of Veterans Administration, Oakland Branch, Pittsburgh, Pennsylvania). DRAWING 103-26 -- PLOT PLAN -- SHOWING NEW CONSTRUCTION - VA Medical Center, Aspinwall Division, 5103 Delafield Avenue (O'Hara Township), Aspinwall, Allegheny County, PA

  16. 4. Photographic copy of original design drawing, dated January 1970 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photographic copy of original design drawing, dated January 1970 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Elevations - Stanley R. Mickelsen Safeguard Complex, Universal Missile Building, Between Tactical Road South & Patrol Road, Nekoma, Cavalier County, ND

  17. The Construction of the UCSC Econo-Box: An Inexpensive Yet Effective Glove Box

    NASA Astrophysics Data System (ADS)

    Suri, Jeff T.

    2001-11-01

    An inexpensive, acrylic dry (glove) box has been fabricated and utilized in the handling of water- and air-sensitive materials. Working drawings are provided and a complete layout of material costs is presented. The box was experimentally determined to be moisture-free for three days and critically oxygen-free for 20 minutes under an inert gas atmosphere.

  18. 7 CFR Exhibit C to Subpart C of... - Checklist of Visual Exhibits and Documentation for RRH, RCH, and LH Proposals

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... E of part 1944 of this chapter. This may include but is not limited to: 1. Schematic design drawings..., lot layouts, major drainageways, and other development planned. Preliminary sections and details shall... decisions regarding the conceptual design of the proposed project should be made prior to this submission...

  19. Millwright: Apprenticeship Course Outline. Apprenticeship and Industry Training. 1605.2

    ERIC Educational Resources Information Center

    Alberta Advanced Education and Technology, 2005

    2005-01-01

    The graduate of the Millwright apprenticeship program is a certified journeyperson who will be able to: (1) understand the principles of sound and safe trade practice; (2) interpret drawings, plans, and be able to layout and develop projects according to specifications; (3) use the tools of the trade in a safe and proper manner; (4) relate to the…

  20. Electric Motor Systems Technician: Apprenticeship Course Outline. Apprenticeship and Industry Training. 3006.2

    ERIC Educational Resources Information Center

    Alberta Advanced Education and Technology, 2006

    2006-01-01

    The graduate of the Electric Motor Systems Technician apprenticeship program is a certified journeyperson who will be able to: (1) understand the principles of sound and safe trade practices; (2) interpret drawings, plans, and be able to layout and develop projects according to specifications; (3) use the tools of the trade in a safe and proper…

  1. Application of TOS/AMS to TDRS E and F

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The development of the Transfer Orbit Stage (TOS) and the study of an Apogee and Maneuvering Stage (AMS) to be used in conjunction with the TOS are presented. A definition of the TOS/AMS configuration is provided along with a detailed design analysis including layout drawings, component definition, performance, sts and spacecraft interface definition, schedules, cost estimates, and specifications documents.

  2. 45 CFR Appendix D to Part 1355 - Foster Care and Adoption Record Layouts

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 05 I.E Date of most recent periodic review 8 06 II.A Child's date of birth 8 07 II.B Sex 1 08 II.C.1... DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL Pt...

  3. 45 CFR Appendix D to Part 1355 - Foster Care and Adoption Record Layouts

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 05 I.E Date of most recent periodic review 8 06 II.A Child's date of birth 8 07 II.B Sex 1 08 II.C.1... DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL Pt...

  4. 45 CFR Appendix D to Part 1355 - Foster Care and Adoption Record Layouts

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 05 I.E Date of most recent periodic review 8 06 II.A Child's date of birth 8 07 II.B Sex 1 08 II.C.1... DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL Pt...

  5. PBF Reactor Building (PER620). Plot plan shows layout, including auxiliary ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Plot plan shows layout, including auxiliary buildings: Emergency Generator (621), Hose House (622), Cooling Tower Auxiliary (624), Maintenance and Storage Warehouse (625), Gas Cylinder Storage (627), Hose House (628), Cooling Tower (720), Substation (719), and other features. Road connections between PBF Reactor, its control building, and SPERT-I site. Note cable trenches along road to control building. Date: July 1965. Ebasco Services, PER-U-101. INEEL index no. 761-0100-00-205-123005 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  6. 3. Photographic copy of original design drawing, dated January 1970 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Photographic copy of original design drawing, dated January 1970 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Upper area and roof plans - Stanley R. Mickelsen Safeguard Complex, Universal Missile Building, Between Tactical Road South & Patrol Road, Nekoma, Cavalier County, ND

  7. 2. Photographic copy of original design drawing, dated January 1970 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Photographic copy of original design drawing, dated January 1970 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) First floor plan - Stanley R. Mickelsen Safeguard Complex, Universal Missile Building, Between Tactical Road South & Patrol Road, Nekoma, Cavalier County, ND

  8. 62. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. McMILLAN DAM - Photographic copy of construction drawing dated April 2, 1917 (from Record Group 115, Box 17, Denver Branch of the National Archives, Denver). RECORD DRAWING OF RAILROAD DIKE - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  9. 13. Photocopy of original construction drawing, dated November 1932 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photocopy of original construction drawing, dated November 1932 (original print in possession of Veterans Administration, Oakland Branch, Pittsburgh, Pennsylvania). DRAWING 32-3 -- ADMINISTRATION BUILDING, BUILDING NO. 32 -- FIRST AND SECOND FLOOR PLANS. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA

  10. 12. Photocopy of original construction drawing, dated November 1932 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photocopy of original construction drawing, dated November 1932 (original print in possession of Veterans Administration, Oakland Branch, Pittsburgh, Pennsylvania). DRAWING 32-2 -- ADMINISTRATION BUILDING, BUILDING NO. 32 -- BASEMENT PLAN AND CUPOLA DETAIL. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA

  11. 17. Photocopy of copy of drawing of Hangar 1301, dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of copy of drawing of Hangar 1301, dated June 15, 1944. Copy of drawing stored at 436 Civil Engineer Squadron, Design Management Element Cece, 600 8th Street, Dover Air Force Base, DE - Dover Air Force Base, Hangar No. 1301, Dover, Kent County, DE

  12. Design optimization of highly asymmetrical layouts by 2D contour metrology

    NASA Astrophysics Data System (ADS)

    Hu, C. M.; Lo, Fred; Yang, Elvis; Yang, T. H.; Chen, K. C.

    2018-03-01

    As design pitch shrinks to the resolution limit of up-to-date optical lithography technology, the Critical Dimension (CD) variation tolerance has been dramatically decreased for ensuring the functionality of device. One of critical challenges associates with the narrower CD tolerance for whole chip area is the proximity effect control on asymmetrical layout environments. To fulfill the tight CD control of complex features, the Critical Dimension Scanning Electron Microscope (CD-SEM) based measurement results for qualifying process window and establishing the Optical Proximity Correction (OPC) model become insufficient, thus 2D contour extraction technique [1-5] has been an increasingly important approach for complementing the insufficiencies of traditional CD measurement algorithm. To alleviate the long cycle time and high cost penalties for product verification, manufacturing requirements are better to be well handled at design stage to improve the quality and yield of ICs. In this work, in-house 2D contour extraction platform was established for layout design optimization of 39nm half-pitch Self-Aligned Double Patterning (SADP) process layer. Combining with the adoption of Process Variation Band Index (PVBI), the contour extraction platform enables layout optimization speedup as comparing to traditional methods. The capabilities of identifying and handling lithography hotspots in complex layout environments of 2D contour extraction platform allow process window aware layout optimization to meet the manufacturing requirements.

  13. 5. Photographic copy of construction drawing, dated March (?), 1959, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of construction drawing, dated March (?), 1959, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN, SHEET 1 OF 1, DRAWING SLF-440-022. - Selfridge Field, Building No. 101, Supply Street east of Maple Street, Mount Clemens, Macomb County, MI

  14. 52. Photographic copy of original asbuilt drawing, dated 10 July ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. Photographic copy of original as-built drawing, dated 10 July 1973 (original drawing in the possession of U.S. Army Corps of Engineers, Huntsville Division). Roof plan - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  15. 6. Photographic copy of construction drawing, dated May 23, 1935, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of construction drawing, dated May 23, 1935, Selfridge Field Office of the Construction Division of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clement, Michigan. PLANS, ELEVATIONS, DETAILS, DRAWING NO. 6638-428. - Selfridge Field, Building No. 116, Birch Avenue at Railroad Street, Mount Clemens, Macomb County, MI

  16. Photographic copy of original design drawing, dated May 1971, revised ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of original design drawing, dated May 1971, revised 1 May 1974 (original Army Operational Drawing in the possession of the U.S. Army Corps of Engineers, Huntsville Division). Elevation and details - Stanley R. Mickelsen Safeguard Complex, Limited Area Sentry Station, Between Access Road & Patrol Road, Nekoma, Cavalier County, ND

  17. Photographic copy of original design drawing, dated May 1971, revised ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of original design drawing, dated May 1971, revised 1 May 1974 (original Army Operational Drawing in the possession of the U.S. Army Corps of Engineers, Huntsville Division). Floor plan and schedules - Stanley R. Mickelsen Safeguard Complex, Limited Area Sentry Station, Between Access Road & Patrol Road, Nekoma, Cavalier County, ND

  18. 61. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    61. McMILLAN DAM - Photographic copy of construction drawing dated April 2, 1917 (from Record Group 115, Box 16, Denver Branch of the National Archives, Denver). RECORD DRAWING OF SPILLWAY NO. 2 - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  19. Multipurpose Scribing and Drawing Tool

    NASA Technical Reports Server (NTRS)

    Ellis, J. M.

    1986-01-01

    Two-part tool reconfigured for variety of jobs. Tool performs several functions useful in layout. Lines, curves, and angles made visible as either bright scribe marks or as dark pencil (or ink) marks. Multipurpose tool speeds up laying out of patterns on sheet metal, wood, plastic, or paper. Tool is carried in pocket, then quickly assembled for service as height gauge, pair of dividers, protractor, surface gauge, or square.

  20. 1. Photographic copy of fire alarm plan for Control and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photographic copy of fire alarm plan for Control and Recording Center Building 4221/E-22, showing layout of rooms. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering 'Edwards Test Station, Fire Alarm Plan, Bldg. E-22,' drawing no. EFA/11-1, December 15, 1961. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  1. Saving Material with Systematic Process Designs

    NASA Astrophysics Data System (ADS)

    Kerausch, M.

    2011-08-01

    Global competition is forcing the stamping industry to further increase quality, to shorten time-to-market and to reduce total cost. Continuous balancing between these classical time-cost-quality targets throughout the product development cycle is required to ensure future economical success. In today's industrial practice, die layout standards are typically assumed to implicitly ensure the balancing of company specific time-cost-quality targets. Although die layout standards are a very successful approach, there are two methodical disadvantages. First, the capabilities for tool design have to be continuously adapted to technological innovations; e.g. to take advantage of the full forming capability of new materials. Secondly, the great variety of die design aspects have to be reduced to a generic rule or guideline; e.g. binder shape, draw-in conditions or the use of drawbeads. Therefore, it is important to not overlook cost or quality opportunities when applying die design standards. This paper describes a systematic workflow with focus on minimizing material consumption. The starting point of the investigation is a full process plan for a typical structural part. All requirements are definedaccording to a predefined set of die design standards with industrial relevance are fulfilled. In a first step binder and addendum geometry is systematically checked for material saving potentials. In a second step, blank shape and draw-in are adjusted to meet thinning, wrinkling and springback targets for a minimum blank solution. Finally the identified die layout is validated with respect to production robustness versus splits, wrinkles and springback. For all three steps the applied methodology is based on finite element simulation combined with a stochastical variation of input variables. With the proposed workflow a well-balanced (time-cost-quality) production process assuring minimal material consumption can be achieved.

  2. 7. Photographic copy of construction drawing, dated October 28, 1964, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of construction drawing, dated October 28, 1964, Edward M. Newman Architect, Detroit, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. EXISTING AND PROPOSED ELEVATIONS, SHEET 3 OF 6, DRAWING NO. SLF-740-085. - Selfridge Field, Building No. 178, East side of Wagner Street south of George Avenue, Mount Clemens, Macomb County, MI

  3. 5. Photographic copy of construction drawing, dated October 29, 1958, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of construction drawing, dated October 29, 1958, Giffels & Rossetti, Detroit, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. STANDBY GENERATOR BUILDING, ARCHITECTURAL; PLAN, ELEVATIONS, SECTION, SHEET 2 OF 12, DRAWING NO. SLF-800-045. - Selfridge Field, Building No. 98, South of East Ramp, east of Taxiway F, Mount Clemens, Macomb County, MI

  4. 9. Photographic copy of construction drawing, dated October 30, 1951, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photographic copy of construction drawing, dated October 30, 1951, Holabird & Root & Burgee, Architects-Engineers, Chicago, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ARCHITECTURAL DETAILS, SHEET 4 OF 9, DRAWING NO. 25-22-04. - Selfridge Field, Building Nos. 1012, 1015, 1016, 1017, Doolittle Drive south of B Street, Mount Clemens, Macomb County, MI

  5. 7. Copy of construction drawing, dated June 10, 1931, Construction ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Copy of construction drawing, dated June 10, 1931, Construction Division, Office of the Construction Quartermaster, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. BOILER HOUSE - BG DETAILS, PLAN NO. 695-300. DRAWING F33A. - Selfridge Field, Building No. 122, North of Wilbur Wright Boulevard between Walnut & Birch Streets, Mount Clemens, Macomb County, MI

  6. 6. Photographic copy of original construction drawing, no date, from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of original construction drawing, no date, from files in the Office of the Chief Engineer, U.S. Fish and Wildlife Service Regional Office, Denver. GATE CONTROL STRUCTURE (generic drawing used for all five dams in refuge) - J. Clark Salyer National Wildlife Refuge Dams, Along Lower Souris River, Kramer, Bottineau County, ND

  7. 13. Photographic copy of original design drawing, dated May 1971, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photographic copy of original design drawing, dated May 1971, revised 16 April 1974 (original Army Operational Drawing in the possession of the U.S. Army Corps of Engineers, Huntsville Division). Sprint launch station and antenna foundation, plans, section details - Stanley R. Mickelsen Safeguard Complex, Missile Launch Area, Within Exclusion Area, Nekoma, Cavalier County, ND

  8. 51. Photographic copy of original asbuilt drawing, dated 10 July ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photographic copy of original as-built drawing, dated 10 July 1973 (original drawing in the possession of U.S. Army Corps of Engineers, Huntsville Division). Elevations C and D - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  9. 19. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Elevation and section "A" - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  10. 25. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Composite second floor plan - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  11. 21. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Roof plan - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  12. 24. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Composite mezzanine floor plan - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  13. 29. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Interior elevations, fourth floor - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  14. 27. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Interior elevations, third floor - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  15. 23. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Composite first floor plan - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  16. Photographic copy of original design drawing, dated January 1970, revised ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of original design drawing, dated January 1970, revised 24 May 1972 (original Army Operational Drawing in the possession of U.S. Army Corps of Engineers, Huntsville, Division). MSRPP general floor plan, lower level - Stanely R. Mickelsen Safeguard Complex, Missile Site Radar Power Plant, Southeast of, & adjacent to, Missile Site Control Building, Nekoma, Cavalier County, ND

  17. 20. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Sections "B" and "C" - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  18. 3. Photographic copy of inkcolinen drawing dated 1923; Henschien & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Photographic copy of ink-co-linen drawing dated 1923; Henschien & McLaren Architects, Chicago; Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloo, Iowa; GENERAL ARRANGEMENT PLAN OF HOG KILLING DEPARTMENT; NORTH AT TOP OF SHEET - Rath Packing Company, Hog Killing & By-Products Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  19. 4. Photographic copy of inkcolinen drawing dated 1923; Henschien & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photographic copy of ink-co-linen drawing dated 1923; Henschien & McLaren Architects, Chicago; Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloo, Iowa; FOURTH FLOOR PLAN, HOG KILLING DEPARTMENT IN BUILDING 40 - Rath Packing Company, Hog Killing & By-Products Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  20. 5. Photographic copy of inkcolinen drawing dated 1923; Henschien & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of ink-co-linen drawing dated 1923; Henschien & McLaren Architects, Chicago; Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloo, Iowa; SECTION, SHOWING LOCATIONS OF KILLING FLOOR AND BY-PRODUCTS DEPARTMENTS - Rath Packing Company, Hog Killing & By-Products Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  1. 6. Photographic copy of construction drawing, dated November 19, 1954, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of construction drawing, dated November 19, 1954, J.F. Pritchard and Company, Kansas City, Missouri, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. OPERATING PUMP HOUSE ARCHITECTURAL PLANS AND ELEVATIONS, SHEET 7 DRAWING NO. 78-24-01, SF5/1164. - Selfridge Field, Building Nos. 1412, 1434, Castle Avenue west of West Ramp, Mount Clemens, Macomb County, MI

  2. 7. Photographic copy of construction drawing, dated November 19, 1954, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of construction drawing, dated November 19, 1954, J.F. Pritchard and Company, Kansas City, Missouri, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. OPERATING PUMPH OUSE ARCHITECTURAL SECTIONS AND DETAILS, SHEET 8 DRAWING NO. 78-24-01, SF5/1165. - Selfridge Field, Building Nos. 1412, 1434, Castle Avenue west of West Ramp, Mount Clemens, Macomb County, MI

  3. 5. Photographic copy of construction drawing, dated May 7, 1943, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of construction drawing, dated May 7, 1943, U.S. Engineers Field Office, Selfridge Field, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. CHANGES AND ADDITIONS TO MOTOR REPAIR SHOP, JOB N-354, DRAWING NO. 1/300. - Selfridge Field, Building No. 197, East of Jefferson Avenue between George & Railroad Streets, Mount Clemens, Macomb County, MI

  4. 8. Photographic copy of original construction drawing, dated August 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of original construction drawing, dated August 10, 1976, Civil Engineering, Selfridge Air National Guard Base, in possession of Selfridge Base Museum, Mt. Clemens, Michigan, ALTER AIRCRAFT SHELTERS, FLOOR PLAN BUILDING NO. 21, DRAWINGS SLF-210-163. - Selfridge Field, Building Nos. 20 & 21, East Ramp south of intersection of Wilbur Wright & Birch Streets, Mount Clemens, Macomb County, MI

  5. Structure A, architectural sections & details. Drawing no. H2, revised ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Structure A, architectural sections & details. Drawing no. H2, revised as-built dated October 11, 1951. Original drawing by Black & Veatch, consulting engineers, Kansas City, Missouri, prepared for the U.S. Department of the Army, Office of Engineers, Military Construction Division, Washington, D.C. dated October 1. - Travis Air Force Base, Building No. 925, W Street, Fairfield, Solano County, CA

  6. 5. Photographic copy of construction drawing, dated September 30, 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of construction drawing, dated September 30, 1970, U.S. Army Engineer District, Detroit, Corps of Engineers, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ELEVATIONS AND DETAILS, SHEET 1 OF 3, DRAWING NO. 86-11-22, FILE SF 5/1782. - Selfridge Field, Building No. 570, Ammo Road northeast of Taxiway A, Mount Clemens, Macomb County, MI

  7. 28. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Composite fourth floor plan, equipment and access platforms - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  8. 22. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Partial underfloor plan of first floor - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  9. 26. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Composite removable third floor and duplexer area - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  10. Photographic copy of original design drawing, dated January 1970, revised ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of original design drawing, dated January 1970, revised 12 March 1971 (original Army Operational Drawing in the possession of U.S. Army Corps of Engineers, Huntsville, Division). MSRPP interior elevations, corridors #216, upper and lower levels - Stanely R. Mickelsen Safeguard Complex, Missile Site Radar Power Plant, Southeast of, & adjacent to, Missile Site Control Building, Nekoma, Cavalier County, ND

  11. 5. Photographic copy of construction drawing, dated February 6, 1942, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of construction drawing, dated February 6, 1942, War Department Office of the Chief of Engineers, Construction Division in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN, ELEVATION, SECTION, SHEET 203 SHEETS, DRAWING NO. 148/4-2, SF 1/141. - Selfridge Field, Building No. 3899, East of Taxiway A, west of Ammo Road, Mount Clemens, Macomb County, MI

  12. Orbit Transfer Rocket Engine Technology Program. Task C.5. Enhanced Heat Transfer Combustor Technology

    DTIC Science & Technology

    1991-12-01

    December, 1991 i--" NASA-Lewis Research Center Cleveland, Ohio 44135 94-08573 Contract No. NAS3-23773 .0l•!ill~• 111 l94 3 16 09V PISULATIXI NOTICI... 3 3.1 Test Hardware and Facility Description...V - Drawings and Layouts of Calorimeter Insert and Related Hardware .... 133 - Ui - FIGURES NUMBER PIALE GE 3 -1 Integrated Component Evaluator (I.C.E

  13. Study on Detailing Design of Precast Concrete Frame Structure

    NASA Astrophysics Data System (ADS)

    Lida, Tian; Liming, Li; Kang, Liu; Jiao, Geng; Ming, Li

    2018-03-01

    Taking a certain precast concrete frame structure as an example, this paper introduces the general procedures and key points in detailing design of emulative cast-in-place prefabricated structure from the aspects of structural scheme, precast element layout, shop drawing design and BIM 3D modelling. This paper gives a practical solution for the detailing design of precast concrete frame structure under structural design codes in China.

  14. Modular control subsystems for use in solar heating systems for multi-family dwellings

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Progress in the development of solar heating modular control subsystems is reported. Circuit design, circuit drawings, and printed circuit board layout are discussed along with maintenance manuals, installation instructions, and verification and acceptance tests. Calculations made to determine the predicted performance of the differential thermostat are given including details and results of tests for the offset temperature, and boil and freeze protect points.

  15. An efficient algorithm for planar drawing of RNA structures with pseudoknots of any type.

    PubMed

    Byun, Yanga; Han, Kyungsook

    2016-06-01

    An RNA pseudoknot is a tertiary structural element in which bases of a loop pair with complementary bases are outside the loop. A drawing of RNA secondary structures is a tree, but a drawing of RNA pseudoknots is a graph that has an inner cycle within a pseudoknot and possibly outer cycles formed between the pseudoknot and other structural elements. Visualizing a large-scale RNA structure with pseudoknots as a planar drawing is challenging because a planar drawing of an RNA structure requires both pseudoknots and an entire structure enclosing the pseudoknots to be embedded into a plane without overlapping or crossing. This paper presents an efficient heuristic algorithm for visualizing a pseudoknotted RNA structure as a planar drawing. The algorithm consists of several parts for finding crossing stems and page mapping the stems, for the layout of stem-loops and pseudoknots, and for overlap detection between structural elements and resolving it. Unlike previous algorithms, our algorithm generates a planar drawing for a large RNA structure with pseudoknots of any type and provides a bracket view of the structure. It generates a compact and aesthetic structure graph for a large pseudoknotted RNA structure in O([Formula: see text]) time, where n is the number of stems of the RNA structure.

  16. 10. Photographic copy of drawing dated January 22, 1908 (Source: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of drawing dated January 22, 1908 (Source: Salt River Project) General plans, index to detail plans and sections, transformer house - Theodore Roosevelt Dam, Transformer House, Salt River, Tortilla Flat, Maricopa County, AZ

  17. 11. Photographic copy of drawing dated February 17, 1908 (Source: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of drawing dated February 17, 1908 (Source: Salt River Project) Transformer building, first floor plan and sections (Transformer floor) - Theodore Roosevelt Dam, Transformer House, Salt River, Tortilla Flat, Maricopa County, AZ

  18. Drawing the PDB: Protein-Ligand Complexes in Two Dimensions.

    PubMed

    Stierand, Katrin; Rarey, Matthias

    2010-12-09

    The two-dimensional representation of molecules is a popular communication medium in chemistry and the associated scientific fields. Computational methods for drawing small molecules with and without manual investigation are well-established and widely spread in terms of numerous software tools. Concerning the planar depiction of molecular complexes, there is considerably less choice. We developed the software PoseView, which automatically generates two-dimensional diagrams of macromolecular complexes, showing the ligand, the interactions, and the interacting residues. All depicted molecules are drawn on an atomic level as structure diagrams; thus, the output plots are clearly structured and easily readable for the scientist. We tested the performance of PoseView in a large-scale application on nearly all druglike complexes of the PDB (approximately 200000 complexes); for more than 92% of the complexes considered for drawing, a layout could be computed. In the following, we will present the results of this application study.

  19. 176. Photographic copy of original construction drawing dated February 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    176. Photographic copy of original construction drawing dated February 10, 1933 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; LOCATION OF THERMOMETER GROUPS. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  20. 174. Photographic copy of original construction drawing dated March 27, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    174. Photographic copy of original construction drawing dated March 27, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; UPLIFT PRESSURE PIPES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  1. 31. Photocopy of microfiched construction drawing by Pelton Water Wheel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photocopy of microfiched construction drawing by Pelton Water Wheel Company, San Francisco, California, originally dated 5-2-47 with alterations dated 6-7-54 and 11-9-54. (Microfiched drawing located at the Denver Service Center, #104/60151 - 5 of 18) LONGITUDINAL SECTION OF RECONSTRUCTED TURBINE - UNIT NO. 2. - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA

  2. Structure A, protective alarm installation details. Drawing no. H3709, revised ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Structure A, protective alarm installation details. Drawing no. H3-709, revised as-built dated August 28, 1952. Original drawing by Black & Veatch, consulting engineers, Kansas City, Missouri, prepared for the U.S. Department of the Army, Office of Engineers, Military Construction Division, Washington, D.C. dated October 1, 1951. - Travis Air Force Base, Building No. 925, W Street, Fairfield, Solano County, CA

  3. Structure A, dock reinforcing & bill of material. Drawing no. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Structure A, dock reinforcing & bill of material. Drawing no. H2-306, revised as-built dated August 13, 1953. Original drawing by Black & Veatch, consulting engineers, Kansas City, Missouri, prepared for the U.S. Department of the Army, Office of Engineers, Military Construction Division, Washington, D.C. dated October 1, 1951. - Travis Air Force Base, Building No. 925, W Street, Fairfield, Solano County, CA

  4. 5. Photographic copy of construction drawing, dated April 4, 1942, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of construction drawing, dated April 4, 1942, War Department Office of the Chief of Engineers Construction Division, Washington, D.C., in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ARCHITECTURAL AND ELECTRICAL, ELEVATIONS AND PLAN, SHEET 1 OF 2, DRAWING 38-1-5B. - Selfridge Field, Building No. 30, Wright Boulevard opposite Birch Street, Mount Clemens, Macomb County, MI

  5. 34. Photocopy of microfiched construction drawing by Galloway & Markwart ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photocopy of microfiched construction drawing by Galloway & Markwart Engineers, San Francisco, California, dated originally Jan. 23, 1917, with a revision dated April 20, 1917. (Microfiched drawing at the Denver Service Center, #104/60154 - 8 of 18) PENSTOCK PIPE, AIR VALVES - MAN HOLE - REDUCER & PIPE BENDS - EXPANSION JOINT & ANCHORS, 'Y' CONNECTION & BLIND FLANGE. - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA

  6. 21 CFR 814.39 - PMA supplements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    .... (6) Changes in the performance or design specifications, circuits, components, ingredients, principle of operation, or physical layout of the device. (7) Extension of the expiration date of the device... new indications for use of the device, significant changes in the performance or design specifications...

  7. 21 CFR 814.39 - PMA supplements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... (6) Changes in the performance or design specifications, circuits, components, ingredients, principle of operation, or physical layout of the device. (7) Extension of the expiration date of the device... new indications for use of the device, significant changes in the performance or design specifications...

  8. 21 CFR 814.39 - PMA supplements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    .... (6) Changes in the performance or design specifications, circuits, components, ingredients, principle of operation, or physical layout of the device. (7) Extension of the expiration date of the device... new indications for use of the device, significant changes in the performance or design specifications...

  9. 4. Photocopy of measured drawing dated January, 1948 FRONT ELEVATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photocopy of measured drawing dated January, 1948 FRONT ELEVATION An addendum to Hanson-Cramer House, Sea Street, south end, Rockport, Knox County, Maine - Hanson-Cramer House, End of Sea Street (moved from Pascal's Avenue), Rockport, Knox County, ME

  10. 5. Photocopy of measured drawing dated January, 1946 ELEVATIONS (EXISTING) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopy of measured drawing dated January, 1946 ELEVATIONS (EXISTING) An addendum to Hanson-Cramer House, Sea Street, south end, Rockport, Knox County, Maine - Hanson-Cramer House, End of Sea Street (moved from Pascal's Avenue), Rockport, Knox County, ME

  11. 188. Photographic copy of original construction drawing dated October 20, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    188. Photographic copy of original construction drawing dated October 20, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). TUNNEL NO. 1 CONTROLLING WORKS; OPERATING HOUSE. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  12. 177. Photographic copy of original construction drawing dated June 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    177. Photographic copy of original construction drawing dated June 15, 1931 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; CONCRETE COOLING TESTS FOR HOOVER DAM. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  13. The effect of navigational expertise on wayfinding in new environments.

    PubMed

    Woollett, Katherine; Maguire, Eleanor A

    2010-12-01

    Becoming proficient at navigation in urban environments is something that we all aspire to. Here we asked whether being an expert at wayfinding in one environment has any effect on learning new spatial layouts. Licensed London taxi drivers are among the most proficient urban navigators, training for many years to find their way around a complex and irregularly-laid out city. We first tested how well they could learn the layout of an unfamiliar town compared with a group of non-taxi drivers. Second, we investigated how effectively taxi drivers could integrate a new district into their existing spatial representation of London. We found that taxi drivers were significantly better than control participants at executing routes through the new town, and representing it at a map-like survey level. However, the benefits of navigational expertise were not universal. Compared with their performance in the new town, taxi drivers were significantly poorer at learning the layout of a new area that had to be integrated with their existing knowledge of London. We consider reasons for this picture of facilitation and limitation, in particular drawing parallels with how knowledge acquisition occurs in the context of expertise in general.

  14. 13. Photocopy of drawing dated January 20, 1958, CROSS SECTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photocopy of drawing dated January 20, 1958, CROSS SECTION, REHABILITATION OF PIERSHED AT FOOT OF 29TH ST. city of New York Department of Marine and Aviation, Contract 3049, Drawing 3. (On file, City of New York Department of Ports and Trade). - South Brooklyn Freight Terminal, 29th Street Pier, Opposite end of Twenty-ninth Street on upper New York Bay, Brooklyn, Kings County, NY

  15. 12. Photocopy of drawing dated January 20, 1958, GENERAL PLAN, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photocopy of drawing dated January 20, 1958, GENERAL PLAN, REHABILITATION OF PIERSHED AT FOOT OF 29TH ST. City of New York Department of Marine and Aviation, Contract 3049, Drawing 1. (On file, City of New York Department of Ports and Trade). - South Brooklyn Freight Terminal, 29th Street Pier, Opposite end of Twenty-ninth Street on upper New York Bay, Brooklyn, Kings County, NY

  16. 15. Photocopy of drawing dated January 20, 1958, END ELEVATIONS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photocopy of drawing dated January 20, 1958, END ELEVATIONS, REHABILITATION OF PIERSHED AT FOOT OF 29TH ST. City of New York Department of Marine and Aviation, Contract 3049, Drawing 2. (On file, City of New York Department of Ports and Trade). - South Brooklyn Freight Terminal, 29th Street Pier, Opposite end of Twenty-ninth Street on upper New York Bay, Brooklyn, Kings County, NY

  17. 16. Photocopy of drawing dated January 20, 1958, SIDE ELEVATIONS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photocopy of drawing dated January 20, 1958, SIDE ELEVATIONS AND DETAILS, REHABILITATION OF PIERSHED AT FOOT OF 29TH ST. city of New York Department of Marine and Aviation, Contract 3049, Drawing 2. (On file, city of New York Department of Ports and Trade). - South Brooklyn Freight Terminal, 29th Street Pier, Opposite end of Twenty-ninth Street on upper New York Bay, Brooklyn, Kings County, NY

  18. 14. Photocopy of drawing dated January 20, 1958, FRONT FRAMING, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photocopy of drawing dated January 20, 1958, FRONT FRAMING, REHABILITATION OF PIERSHED AT FOOT OF 29TH ST. City of New York Department of Marine and Aviation, Contract 3049, Drawing 5. (On file, City of New York Department of Ports and Trade). - South Brooklyn Freight Terminal, 29th Street Pier, Opposite end of Twenty-ninth Street on upper New York Bay, Brooklyn, Kings County, NY

  19. 10. Photocopy of drawing dated November 25, 1957, DETAILS & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of drawing dated November 25, 1957, DETAILS & GENERAL DECK PLAN, REHABILITATION OF 29TH ST. PIER, GOWANUS BAY. city of New York Department of Marine and Aviation, Contract 2994, Drawing 2. (On file, city of New York Department of Ports and Trade). - South Brooklyn Freight Terminal, 29th Street Pier, Opposite end of Twenty-ninth Street on upper New York Bay, Brooklyn, Kings County, NY

  20. 11. Photocopy of drawing dated November 25, 1957, SECTIONS & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photocopy of drawing dated November 25, 1957, SECTIONS & METHODS OF REPAIR, REHABILITATION OF 29TH ST. PIER, GOWANUS BAY. City of New York Department of Marine and Aviation, Contract 2994, Drawing 1. (On file, City of New York Department of Ports and Trade). - South Brooklyn Freight Terminal, 29th Street Pier, Opposite end of Twenty-ninth Street on upper New York Bay, Brooklyn, Kings County, NY

  1. 42. Photocopy of drawing no. C3599, dated 10 December 1915, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photocopy of drawing no. C-3599, dated 10 December 1915, entitled "New York Municipal Railway Corporation, Coney Island Terminal Contract Drawing. Steel Plan of Stillwell Avenue Station, " showing structural framing plan using new and used iron and steel column griders. Original on file, plan archives of MTA New York City Transit, New York. - Stillwell Avenue Station, Intersection of Stillwell & Surf Avenues, Brooklyn, Kings County, NY

  2. 6. Photographic copy of construction drawing, dated August 28, 1942, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of construction drawing, dated August 28, 1942, War Department Office of the Chief of Engineers, Construction Division, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. TYPE TAR-8-A, PLAN OF APRONS AND TAXIWAYS, SHEET 1 OF 3 SHEETS, DRAWING NO. 148/4-1, SF 1/141. - Selfridge Field, Building No. 3899, East of Taxiway A, west of Ammo Road, Mount Clemens, Macomb County, MI

  3. 7. Photocopy of measured drawing dated December, 1947 SECOND FLOOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of measured drawing dated December, 1947 SECOND FLOOR PLAN An addendum to Hanson-Cramer House, Sea Street, south end, Rockport, Knox County, Maine - Hanson-Cramer House, End of Sea Street (moved from Pascal's Avenue), Rockport, Knox County, ME

  4. 6. Photocopy of measured drawing dated December, 1947 FIRST FLOOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of measured drawing dated December, 1947 FIRST FLOOR PLAN An addendum to Hanson-Cramer House, Sea Street, south end, Rockport, Knox County, Maine - Hanson-Cramer House, End of Sea Street (moved from Pascal's Avenue), Rockport, Knox County, ME

  5. 40. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). ROOF PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  6. 38. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). FIRST FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  7. 37. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). BASEMENT PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  8. 39. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). SECOND FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  9. 45. Photographic copy of original construction drawing, dated 16 February ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photographic copy of original construction drawing, dated 16 February 1916 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). LOT SURVEY. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  10. 41. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). CROSS SECTIONS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  11. 44. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. GROUND FLOOR PLAN; SHEET NO. 2 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  12. 11. Photocopy of an elevation drawing (dated January 1924, B.J. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photocopy of an elevation drawing (dated January 1924, B.J. Garnett, Designing Engineer, H.S. Baker, County Engineer), housed at the Spokane County Public Works Department, Spokane - Latah Creek Bridge No. 4102, Prairie View Road, Waverly, Spokane County, WA

  13. 190. Photographic copy of original construction drawing dated November 7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    190. Photographic copy of original construction drawing dated November 7, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). TUNNEL NO. 1 CONTROLLING WORKS; MODEL OF VENTURE METER-FILMS. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  14. 145. Photographic copy of original construction drawing dated April 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    145. Photographic copy of original construction drawing dated April 10, 1928 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; PLAN, ELEVATION AND SECTIONS, ARCH-GRAVITY DAM. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  15. 15. Photographic copy of sepia of original construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photographic copy of sepia of original construction drawing dated September 15, 1938 (original sepia in plan room of Base Civil Engineer, Scott AFB) Elevations - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL

  16. 16. Photographic copy of drawing, dated September 1924, in possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photographic copy of drawing, dated September 1924, in possession of San Carlos Irrigation Project. United States Indian Service, Irrigation. PIMA LATERAL HEADWORKS, RADIAL GATES - San Carlos Irrigation Project, Pima Lateral, Main Canal at Sacaton Dam, Coolidge, Pinal County, AZ

  17. 44. Photographic copy of original construction drawing, dated August 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photographic copy of original construction drawing, dated August 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). PLANS AND SECTIONS OF VAULTS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  18. 188. Photocopy of drawing, Twin Falls Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    188. Photocopy of drawing, Twin Falls Canal Company, date unknown. DETAILS OF GATE RAISING MECHANISM, NO COUNTY; BLUEPRINT. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  19. 47. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. WEST, NORTH, AND SOUTH ELEVATIONS; SHEET NO. 5 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  20. 45. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. FIRST FLOOR PLAN AND DETAILS; SHEET NO. 3 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  1. 187. Photographic copy of original construction drawing dated October 20, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    187. Photographic copy of original construction drawing dated October 20, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). TUNNEL NO. 1 CONTROLLING WORKS; GENERAL PLAN AND SECTIONS-LOCATION MAP. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  2. 155. Photographic copy of original construction drawing dated October 24, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    155. Photographic copy of original construction drawing dated October 24, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYEE DAM SPILLWAY; 60 X 12 RING GATE-CONTROL; INSTALLATION ASSEMBLIES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  3. Photographic copy of architectural drawing no. 413319 dated 1917 on ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing no. 4133-19 dated 1917 on file at the Engineering and Planning Office, Panama Canal Commission, Balboa, Republic of Panama. Cross section along line "AA". - Gorgas Hospital, Isolation Ward, Culebra Road, Balboa Heights, Former Panama Canal Zone, CZ

  4. 167. Photographic copy of original construction drawing dated October 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    167. Photographic copy of original construction drawing dated October 10, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM-IRRIGATION OUTLET; 48 NEEDLE VALVES; PRESSURE PIPING AND MATERIAL LIST. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  5. 16. Photographic copy of sepia of original construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photographic copy of sepia of original construction drawing dated September 15, 1938 (original sepia in plan room of Base Civil Engineer, Scott AFB) Interior details - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL

  6. 17. Photographic copy of original remodeling drawings dated July 8, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of original remodeling drawings dated July 8, 1988 (original sepia in plan room of Base Civil Engineer, Scott AFB) First and second floor plans - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL

  7. 44. Photocopy of drawing no. C3737, dated 24 October 1917, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photocopy of drawing no. C-3737, dated 24 October 1917, entitled "New York Municipal Railway Corporation, Coney Island Terminal, Details of Concrete Track Deck and Platforms, Stillwell Avenue Station, Working Drawing," showing typical reinforced concrete encasement of iron and steel girders and columns. Original on file, plan archives of MTA New York City Transit, New York. - Stillwell Avenue Station, Intersection of Stillwell & Surf Avenues, Brooklyn, Kings County, NY

  8. Hercules Single-Stage Reusable Vehicle (HSRV) Operating Base

    NASA Technical Reports Server (NTRS)

    Moon, Michael J.; McCleskey, Carey M.

    2017-01-01

    Conceptual design for the layout of lunar-planetary surface support systems remains an important area needing further master planning. This paper explores a structured approach to organize the layout of a Mars-based site equipped for routinely flying a human-scale reusable taxi system. The proposed Hercules Transportation System requires a surface support capability to sustain its routine, affordable, and dependable operation. The approach organizes a conceptual Hercules operating base through functional station sets. The station set approach will allow follow-on work to trade design approaches and consider technologies for more efficient flow of material, energy, and information at future Mars bases and settlements. The station set requirements at a Mars site point to specific capabilities needed. By drawing from specific Hercules design characteristics, the technology requirements for surface-based systems will come into greater focus. This paper begins a comprehensive process for documenting functional needs, architectural design methods, and analysis techniques necessary for follow-on concept studies.

  9. 14. Photographic copy of construction drawing, dated May??, 19??, Department ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photographic copy of construction drawing, dated May??, 19??, Department of the Air Force, Air Defense Command, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. - Selfridge Field, Building No. 1050, Northwest corner of Doolittle Avenue & D Street; Harrison Township, Mount Clemens, Macomb County, MI

  10. 186. Photocopy of drawing, Twin Falls Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    186. Photocopy of drawing, Twin Falls Canal Company, date unknown. DRY CREEK RESERVOIR, CASSIA COUNTY (NOW TWIN FALLS COUNTY); MAP. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  11. 191. Photocopy of drawing, Twin Falls Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    191. Photocopy of drawing, Twin Falls Canal Company, date unknown. SPILLWAY GATES, MILNER DAM, TWIN FALLS COUNTY, MILNER, IDAHO; BLUEPRINT. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  12. 2. Photographic copy of original construction drawings, dated 30 September ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Photographic copy of original construction drawings, dated 30 September 1930, located at the John Gaw Meem Archive of Southwestern Architecture, Special Collections, University of New Mexico, Albuquerque, New Mexico. FIRST FLOOR PLAN. - St. Anthony's Orphanage, 1500 Indian School Road, Northwest, Albuquerque, Bernalillo County, NM

  13. 189. Photographic copy of original construction drawing dated December 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    189. Photographic copy of original construction drawing dated December 10, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). TUNNEL NO.1 CONTROLLING WORKS; WATER TIGHT DOOR; CHANNEL VENT INLETS-PIER NOSE ANGLES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  14. 193. Photographic copy of original construction drawing dated October 31, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    193. Photographic copy of original construction drawing dated October 31, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). TUNNEL NO. 1 CONTROLLING WORKS; GATE CHAMBER; UNDERHUNG CRANE AND HOIST-HAND OPERATED. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  15. 156. Photographic copy of original construction drawing dated October 24, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    156. Photographic copy of original construction drawing dated October 24, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM SPILLWAY; 60 X 12 RING GATE-CONTROL; SCALE FRAME AND SCALES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  16. 197. Photocopy of drawing, Twin Falls, Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    197. Photocopy of drawing, Twin Falls, Canal Company, date unknown. GATE STEMS AND LIFTING DEVICES, NO COUNTY; BLUEPRINT SKETCHES. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  17. 166. Photographic copy of original construction drawing dated September 5, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    166. Photographic copy of original construction drawing dated September 5, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM-IRRIGATION OUTLET; DRAIN VENT AND PRESSURE PIPING INSTALLATION; 48 NEEDLE VALVES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  18. 14. Photographic copy of sepia of original construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photographic copy of sepia of original construction drawing dated September 15, 1938 (Original sepia in plan room of Base Civil Engineer, Scott AFB) First and second floor plans - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL

  19. 12. Photocopy of drawing dated May 26, 1902, on file, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photocopy of drawing dated May 26, 1902, on file, City of New York Department of Ports, International Trade, and Commerce. ERECTION DIAGRAM/44TH ST. PIER - S. BROOKLYN - N.Y./WATER FRONT IMPROVEMENTS FOR THE BUSH COMPANY LT'D. American Bridge Company, Brooklyn Plant, Drawing No. 1431, Order No. A1343, Sheet No. 5. - Bush Terminal Company, Pier 5, Opposite end of Forty-first Street on Upper New York Bay, Brooklyn, Kings County, NY

  20. Computer presentation of data in science.

    NASA Astrophysics Data System (ADS)

    Simmonds, D.; Reynolds, L.

    Contents: How this book was created. Foreword. 1. Introduction. 2. Choosing your system and software. 3. Working methods. 4. Preparing manuscripts and camera-ready copy. 5. Principles of typography and layout. 6. Using type and space to show the structure of text. 7. Artwork creation and drawing tips. 8. Posters, slides and OHP transparencies. 9. Designing with colour. Glossaries 1 and 2. Appendix 1: Copyfitting. Appendix 2: Signatures and imposition. Appendix 3: Publishing and the law. Appendix 4: Working comfort.

  1. 7. Photographic copy of floor plan drawing, dated August 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of floor plan drawing, dated August 10, 1968, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. - Selfridge Field, Building No. 592, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI

  2. Photographic copy of floor plan drawing, dated August 10, 1968, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of floor plan drawing, dated August 10, 1968, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan - Selfridge Field, Building No. 1580, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI

  3. 28. Lithocopy of original survey drawing #X1, dated April 19, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Lithocopy of original survey drawing #X-1, dated April 19, 1911, from linen in possession of General Services Administration, Field Office, Region 7, Fort Worth, Texas. Site survey - Del Rio Federal Building, 100 Broadway, corner of Main Street, Del Rio, Val Verde County, TX

  4. 185. Photocopy of drawing, Twin Falls Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    185. Photocopy of drawing, Twin Falls Canal Company, date unknown. MILNER DAM CROSS SECTION PLAN, TWIN FALLS COUNTY, MILNER, IDAHO; BLUEPRINT. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  5. 195. Photocopy of drawing, Twin Falls Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    195. Photocopy of drawing, Twin Falls Canal Company, date unknown. PLAN OF CONSTRUCTION AREA PLANT, TWIN FALLS COUNTY, MILNER, IDAHO; BLUEPRINT. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  6. 189. Photocopy of drawing, Twin Falls Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    189. Photocopy of drawing, Twin Falls Canal Company, date unknown. ROCK CREEK CROSSING, LOW LINE CANAL, TWIN FALLS COUNTY, SOUTH OF KIMBERLY, IDAHO; BLUEPRINT. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  7. 190. Photocopy of drawing, Twin Falls Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    190. Photocopy of drawing, Twin Falls Canal Company, date unknown. GENERAL PLAN OF MILNER DAM TUNNELS, TWIN FALLS COUNTY, MILNER, IDAHO; BLUEPRINT. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  8. 187. Photocopy of drawing, Twin Falls Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    187. Photocopy of drawing, Twin Falls Canal Company, date unknown. TOPOGRAPHICAL MAP OF MILNER DAM LOCATION, TWIN FALLS COUNTY, MILNER, IDAHO; BLUEPRINT MAP. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  9. 33. Photographic copy of construction drawing, dated 4/1925, in possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Photographic copy of construction drawing, dated 4/1925, in possession of SCIP Office, Coolidge, AZ. United States Indian Service, Irrigation. CONSTRUCTION CAMP - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  10. 12. Photographic copy of construction drawing, dated September 29, 1932, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photographic copy of construction drawing, dated September 29, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-25?? SDO 163 (ELEVATIONS) - Selfridge Field, Building Nos. 246 & 253, 246 Birch Street & 253 Wagner Street, Mount Clemens, Macomb County, MI

  11. 8. Photographic copy of construction drawing, dated November 10, 1932, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of construction drawing, dated November 10, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLANS, ELEVATIONS, DETAILS, PLAN NO. 635-100. - Selfridge Field, Building No. 129, Wilbur Wright Boulevard at Ash Street, Mount Clemens, Macomb County, MI

  12. 43. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). NORTH ELEVATION (NORTH SIDE) AND WEST ELEVATION (WEST SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  13. 42. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). EAST ELEVATION (EAST SIDE) AND SOUTH ELEVATION (SOUTH SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  14. 60. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. McMILLAN DAM - Photographic copy of construction drawing dated April 4, 1917 (from aperture card located at Bureau of Reclamation, Salt Lake City). DETAIL CONSTRUCTION SPILLWAY NO. 2 - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  15. 57. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. McMILLAN DAM - Photographic copy of construction drawing dated January 15, 1913 (from aperture card located at Bureau of Reclamation, Salt Lake City) POWER LIFTING MECHANISM FOR HEADGATES - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  16. 46. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities planning Office, Iowa State University, Ames, Iowa. SECOND FLOOR PLAN, ROOF PLANS, AND ROOF DETAILS; SHEET NO. 4 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  17. 12. Photographic copy of original design drawing, dated January 1970, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photographic copy of original design drawing, dated January 1970, revised 15 June 1973 (original print in possession of the U.S. Army Corps of Engineers, Huntsville Division). Spartan launch station concrete sections - Stanley R. Mickelsen Safeguard Complex, Missile Launch Area, Within Exclusion Area, Nekoma, Cavalier County, ND

  18. 133. Photocopy of original construction drawing, dated 21 March 1940 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    133. Photocopy of original construction drawing, dated 21 March 1940 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-40-8) TYPICAL PIER ELEVATION. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  19. 170. Photographic copy of original construction drawing dated October 24, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    170. Photographic copy of original construction drawing dated October 24, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). 48 INTERNAL DIFFERENTIAL NEEDLE VALVE, SPLIT LONG BODY TYPE-EXTENDED CONTROL, GENERAL ASSEMBLY-LIST OF PARTS. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  20. 152. Photographic copy of original construction drawing dated October 24, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    152. Photographic copy of original construction drawing dated October 24, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). 60 x 12 RING GATE CONTROL; FLOAT WELL ASSEMBLY AND COVER HOIST STEM-CONNECTION ROD-SLEEVE. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  1. 192. Photographic copy of original construction drawing dated August 27, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    192. Photographic copy of original construction drawing dated August 27, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). TUNNEL NO. 1 CONTROLLING WORKS; 4-9 X 22-0 EMERGENCY AND REGULATING GATES ASSEMBLY. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  2. 150. Photographic copy of original construction drawing dated July 29, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    150. Photographic copy of original construction drawing dated July 29, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). 60 x 12 SPILLWAY RING GATE; CONTROL AND PIPING INSTALLATION AND ANCHOR BOLT LOCATION (SHEET 3 OF 8). - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  3. 27. Photographic copy of original construction drawing, dated May 22, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photographic copy of original construction drawing, dated May 22, 1951 (from paper copy at Engineering Flight, Ellsworth Air Force Base, SD). Readiness hangar architectural: plan at clerestory & elevation. - Ellsworth Air Force Base, Readiness Hangar, Kenny Road, southeast corner of interstction with G Avenue, Blackhawk, Meade County, SD

  4. 186. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    186. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONCRETE RESEARCH FOR HOOVER DAM; MISCELLANEOUS VERTICAL SECTIONS; THROUGH PANELS. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  5. 179. Photographic copy of original construction drawing dated July, 1932 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    179. Photographic copy of original construction drawing dated July, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONCRETE RESEARCH FOR HOOVER DAM; TERMINAL BOARD FOR PANEL DEVICES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  6. 181. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    181. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONCRETE RESEARCH FOR HOOVER DAM; LOCATION OF TERMINAL BOARDS AND CONDUCTS. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  7. 180. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    180. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONRETE RESEARCH FOR HOOVER DAM; INVAR METER DETAILS. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  8. 185. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    185. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONCRETE RESEARCH FOR HOOVER DAM; CONTRACTION JOINT METER INSTALLATION. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  9. 18. Photographic copy of original remodeling drawings dated July 8, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photographic copy of original remodeling drawings dated July 8, 1988 (original sepia in plan room of Base Civil Engineer, Scott AFB) First and second floor demolition and framing plan - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL

  10. 7. Photographic copy of floor plan drawing, dated September 26, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of floor plan drawing, dated September 26, 1975, Selfridge ANG Base, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN BLDG. 1583. - Selfridge Field, Building Nos. 1582, 1583, 1584, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI

  11. 6. Photographic copy of floor plan drawing, dated August 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of floor plan drawing, dated August 10, 1968, Selfridge ANG Base, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLANS BLDGS. 1582 & 1584. - Selfridge Field, Building Nos. 1582, 1583, 1584, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI

  12. 36. MAIN CANAL Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. MAIN CANAL - Photographic copy of construction drawing dated 1907 (from Record Group 115, Box 17, Denver Branch of the National Archives, Denver) WASTE GATES ABOVE DARK CANYON SIPHON - Carlsbad Irrigation District, Main Canal, 4 miles North to 12 miles Southeast of Carlsbad, Carlsbad, Eddy County, NM

  13. Mixed integer programming model for optimizing the layout of an ICU vehicle.

    PubMed

    Alejo, Javier Sánchez; Martín, Modoaldo Garrido; Ortega-Mier, Miguel; García-Sánchez, Alvaro

    2009-12-08

    This paper presents a Mixed Integer Programming (MIP) model for designing the layout of the Intensive Care Units' (ICUs) patient care space. In particular, this MIP model was developed for optimizing the layout for materials to be used in interventions. This work was developed within the framework of a joint project between the Madrid Technical Unverstity and the Medical Emergency Services of the Madrid Regional Government (SUMMA 112). The first task was to identify the relevant information to define the characteristics of the new vehicles and, in particular, to obtain a satisfactory interior layout to locate all the necessary materials. This information was gathered from health workers related to ICUs. With that information an optimization model was developed in order to obtain a solution. From the MIP model, a first solution was obtained, consisting of a grid to locate the different materials needed for the ICUs. The outcome from the MIP model was discussed with health workers to tune the solution, and after slightly altering that solution to meet some requirements that had not been included in the mathematical model, the eventual solution was approved by the persons responsible for specifying the characteristics of the new vehicles. According to the opinion stated by the SUMMA 112's medical group responsible for improving the ambulances (the so-called "coaching group"), the outcome was highly satisfactory. Indeed, the final design served as a basis to draw up the requirements of a public tender. As a result from solving the Optimization model, a grid was obtained to locate the different necessary materials for the ICUs. This grid had to be slightly altered to meet some requirements that had not been included in the mathematical model. The results were discussed with the persons responsible for specifying the characteristics of the new vehicles. The outcome was highly satisfactory. Indeed, the final design served as a basis to draw up the requirements of a public tender. The authors advocate this approach to address similar problems within the field of Health Services to improve the efficiency and the effectiveness of the processes involved. Problems such as those in operation rooms or emergency rooms, where the availability of a large amount of material is critical are eligible to be dealt with in a simmilar manner.

  14. Mixed integer programming model for optimizing the layout of an ICU vehicle

    PubMed Central

    2009-01-01

    Background This paper presents a Mixed Integer Programming (MIP) model for designing the layout of the Intensive Care Units' (ICUs) patient care space. In particular, this MIP model was developed for optimizing the layout for materials to be used in interventions. This work was developed within the framework of a joint project between the Madrid Technical Unverstity and the Medical Emergency Services of the Madrid Regional Government (SUMMA 112). Methods The first task was to identify the relevant information to define the characteristics of the new vehicles and, in particular, to obtain a satisfactory interior layout to locate all the necessary materials. This information was gathered from health workers related to ICUs. With that information an optimization model was developed in order to obtain a solution. From the MIP model, a first solution was obtained, consisting of a grid to locate the different materials needed for the ICUs. The outcome from the MIP model was discussed with health workers to tune the solution, and after slightly altering that solution to meet some requirements that had not been included in the mathematical model, the eventual solution was approved by the persons responsible for specifying the characteristics of the new vehicles. According to the opinion stated by the SUMMA 112's medical group responsible for improving the ambulances (the so-called "coaching group"), the outcome was highly satisfactory. Indeed, the final design served as a basis to draw up the requirements of a public tender. Results As a result from solving the Optimization model, a grid was obtained to locate the different necessary materials for the ICUs. This grid had to be slightly altered to meet some requirements that had not been included in the mathematical model. The results were discussed with the persons responsible for specifying the characteristics of the new vehicles. Conclusion The outcome was highly satisfactory. Indeed, the final design served as a basis to draw up the requirements of a public tender. The authors advocate this approach to address similar problems within the field of Health Services to improve the efficiency and the effectiveness of the processes involved. Problems such as those in operation rooms or emergency rooms, where the availability of a large amount of material is critical are eligible to be dealt with in a simmilar manner. PMID:19995438

  15. Automatic yield-line analysis of slabs using discontinuity layout optimization

    PubMed Central

    Gilbert, Matthew; He, Linwei; Smith, Colin C.; Le, Canh V.

    2014-01-01

    The yield-line method of analysis is a long established and extremely effective means of estimating the maximum load sustainable by a slab or plate. However, although numerous attempts to automate the process of directly identifying the critical pattern of yield-lines have been made over the past few decades, to date none has proved capable of reliably analysing slabs of arbitrary geometry. Here, it is demonstrated that the discontinuity layout optimization (DLO) procedure can successfully be applied to such problems. The procedure involves discretization of the problem using nodes inter-connected by potential yield-line discontinuities, with the critical layout of these then identified using linear programming. The procedure is applied to various benchmark problems, demonstrating that highly accurate solutions can be obtained, and showing that DLO provides a truly systematic means of directly and reliably automatically identifying yield-line patterns. Finally, since the critical yield-line patterns for many problems are found to be quite complex in form, a means of automatically simplifying these is presented. PMID:25104905

  16. PBF Cubicle 13. Shield wall details illustrate shielding technique of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Cubicle 13. Shield wall details illustrate shielding technique of stepped penetrations and brick layout scheme for valve stem extension sleeve. Aerojet Nuclear Company. Date: May 1976. INEEL index no. 761-0620-00-400-195280 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  17. Photographic copy of construction drawing, dated October 19, 1962, Department ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of construction drawing, dated October 19, 1962, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ALTER POL OPERATIONS, SHEET 1 OF 2, SLF 140-070 - Selfridge Field, Building No. 1445, Sugarbush Road north of Bunker Road, Mount Clemens, Macomb County, MI

  18. 6. Photographic copy of floor plan drawing, dated August 18, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of floor plan drawing, dated August 18, 1968, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN BLDG. 1585. - Selfridge Field, Building No. 1585, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI

  19. Photographic copy of floor plan drawing, dated March 7, 1968, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of floor plan drawing, dated March 7, 1968, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN BLDG. 1575 - Selfridge Field, Building No. 1575, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI

  20. 11. Photographic copy of construction drawing, dated September 17, 1982, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of construction drawing, dated September 17, 1982, Straub Associates, Troy, Michigan, in possession of Selfride Base Museum, Mt. Clemens, Michigan. ENERGY CONSERVATION, EXISTING AND PROPOSED PLANS, SHEET 5 OF 5, MCP-93. - Selfridge Field, Building No. 121, Wilbur Wright Avenue west of Ash Street, Mount Clemens, Macomb County, MI

  1. 19. Photographic copy of construction drawing, dated July6, 1987, Goudreau/Wakely ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographic copy of construction drawing, dated July6, 1987, Goudreau/Wakely Associates, Mt. Pleasant, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ARCHITECTURAL, DEMOLITION PLANS EXISTING HANGAR (566 (4 OF 15). - Selfridge Field, Building No. 3566, Ammo Road northeast of Taxiway A, Mount Clemens, Macomb County, MI

  2. 106. Photocopy of original construction drawing, dated 7 December 1934 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    106. Photocopy of original construction drawing, dated 7 December 1934 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-5-311) POWERHOUSE, 60,000 H.P DRAFT TUBE DESIGN. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  3. 194. Photocopy of drawing, Twin Falls Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    194. Photocopy of drawing, Twin Falls Canal Company, date unknown. PROFILE AND GATE PLAN, NORTH ISLAND CROSS SECTION OF DAM, TWIN FALLS COUNTY, MILNER, IDAHO; BLUEPRINT. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  4. 11. Photographic copy of construction drawing, dated July ??, 19?? ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of construction drawing, dated July ??, 19?? (illegible, ca. 1927), Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. DETAILS, SECTIONS (illegible), SDO 141 - Selfridge Field, Building Nos. 228, 230, 232, 234, 236, 228, 230, 232, 234, & 236 George Avenue, Mount Clemens, Macomb County, MI

  5. 11. Photographic copy of construction drawing, dated July 29, 1932, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of construction drawing, dated July 29, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2511 SDO 139 (FLOOR PLANS) - Selfridge Field, Building Nos. 246 & 253, 246 Birch Street & 253 Wagner Street, Mount Clemens, Macomb County, MI

  6. 11. Photographic copy of construction drawing, dated September 20, 1930, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of construction drawing, dated September 20, 1930, Construction Division Office of the Quartermaster General in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-1548, SDO 133 (SECTIONS, EXTERIOR DETAILS) - Selfridge Field, Building Nos. 248, 252 & 254, 248 Birch Street & 252, 254 Wagner Street, Mount Clemens, Macomb County, MI

  7. 16. Photographic copy of construction drawing, dated July 29, 1932, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photographic copy of construction drawing, dated July 29, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2512, SDO 182 (VESTIBULE DETAILS) - Selfridge Field, Building Nos. 242, 247, 250, 242 & 247 Birch Street & 250 Wagner Street, Mount Clemens, Macomb County, MI

  8. 10. Photographic copy of construction drawing, dated February 6, 1931, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of construction drawing, dated February 6, 1931, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FOUNDATION, FIRST FLOOR PLANS, ELEVATIONS, DETAILS, PLAN NO. 6658-130. - Selfridge Field, Building No. 121, Wilbur Wright Avenue west of Ash Street, Mount Clemens, Macomb County, MI

  9. 10. Photographic copy of construction drawing, dated July ??, 19?? ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of construction drawing, dated July ??, 19?? (illegible, ca. 1927), Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN (illegible), SDO 141 - Selfridge Field, Building Nos. 228, 230, 232, 234, 236, 228, 230, 232, 234, & 236 George Avenue, Mount Clemens, Macomb County, MI

  10. 14. Photographic copy of construction drawing, dated July 29, 1932, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photographic copy of construction drawing, dated July 29, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2513, SDO 183 (SECTIONS) - Selfridge Field, Building Nos. 242, 247, 250, 242 & 247 Birch Street & 250 Wagner Street, Mount Clemens, Macomb County, MI

  11. 13. Photographic copy of construction drawing, dated July 29, 1932, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photographic copy of construction drawing, dated July 29, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2512, SDO 132 (VESTIBULE DETAILS) - Selfridge Field, Building Nos. 248, 252 & 254, 248 Birch Street & 252, 254 Wagner Street, Mount Clemens, Macomb County, MI

  12. 9. Photographic copy of construction drawing, dated July ??, 19?? ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photographic copy of construction drawing, dated July ??, 19?? (illegible, ca. 1927), Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN (illegible), SDO 140 - Selfridge Field, Building Nos. 228, 230, 232, 234, 236, 228, 230, 232, 234, & 236 George Avenue, Mount Clemens, Macomb County, MI

  13. 63. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. McMILLAN DAM - Photographic copy of construction drawing dated July 19, 1937 (from aperture card located at Bureau of Reclamation, Salt Lake City). McMILLAN DAM - GENERAL PLAN AND SECTIONS WITH PROPOSED IMPROVEMENTS - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  14. 13. Photographic copy of original construction drawing dated May 5, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photographic copy of original construction drawing dated May 5, 1935, from the files at the Office of the Chief Engineer, U.S. Fish and Wildlife Service Regional Office, Denver. STRUCTURAL DETAILS GATE STRUCTURE 320 - J. Clark Salyer National Wildlife Refuge, Dam 320, Along Lower Souris River, Kramer, Bottineau County, ND

  15. 109. Photocopy of original construction drawing, dated 10 January 1935 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    109. Photocopy of original construction drawing, dated 10 January 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (T-3-7) POWERHOUSE FISHWAY, GENERAL ARRANGEMENT DIFFUSING CHAMBER UNDER ICE SLUICE. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  16. 157. Photographic copy of original construction drawing dated July 29, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    157. Photographic copy of original construction drawing dated July 29, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; 60 X 12 SPILLWAY RING GATE; CONTROL AND PIPING INSTALLATION AND ANCHOR BOLT LOCATION (SHEET 2 OF 8). - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  17. 5. Historic American Buildings Survey Photocopy of elevation drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Historic American Buildings Survey Photocopy of elevation drawing dated 1888 in office of First Coast Guard District, J. F. Kennedy Federal Building, Government Center, Boston, Mass. 02203 LIGHT-TOWER AT BOON ISLAND, MAINE SHOWING WROUGHT IRON WORK PROPOSED FOR ARRESTING VIBRATION OF LANTERN - Boon Island Light Tower, Cape Neddick, York County, ME

  18. 4. PHOTOGRAPHIC COPY OF ORIGINAL CONSTRUCTION DRAWING, DATED MAY 13, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. PHOTOGRAPHIC COPY OF ORIGINAL CONSTRUCTION DRAWING, DATED MAY 13, 1919, DETACHMENT BARRACK WITHOUT MESS, WAR DEPARTMENT, CONSTRUCTION DIVISION, PLAN # 353, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  19. 18. Photographic copy of drawing, dated March 1924, in possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photographic copy of drawing, dated March 1924, in possession of SCIP office, Coolidge, AZ. United States Indian Service, Irrigation. Design by Neuffer. FLORENCE-CASA GRANDE CANAL, TURNOUT STA. 148+18.7, PLAN AND DETAILS. - San Carlos Irrigation Project, Marin Canal, Amhurst-Hayden Dam to Picacho Reservoir, Coolidge, Pinal County, AZ

  20. The Effect of Perspective on Presence and Space Perception

    PubMed Central

    Ling, Yun; Nefs, Harold T.; Brinkman, Willem-Paul; Qu, Chao; Heynderickx, Ingrid

    2013-01-01

    In this paper we report two experiments in which the effect of perspective projection on presence and space perception was investigated. In Experiment 1, participants were asked to score a presence questionnaire when looking at a virtual classroom. We manipulated the vantage point, the viewing mode (binocular versus monocular viewing), the display device/screen size (projector versus TV) and the center of projection. At the end of each session of Experiment 1, participants were asked to set their preferred center of projection such that the image seemed most natural to them. In Experiment 2, participants were asked to draw a floor plan of the virtual classroom. The results show that field of view, viewing mode, the center of projection and display all significantly affect presence and the perceived layout of the virtual environment. We found a significant linear relationship between presence and perceived layout of the virtual classroom, and between the preferred center of projection and perceived layout. The results indicate that the way in which virtual worlds are presented is critical for the level of experienced presence. The results also suggest that people ignore veridicality and they experience a higher level of presence while viewing elongated virtual environments compared to viewing the original intended shape. PMID:24223156

  1. Productivity increase through implementation of CAD/CAE workstation

    NASA Technical Reports Server (NTRS)

    Bromley, L. K.

    1985-01-01

    The tracking and communication division computer aided design/computer aided engineering system is now operational. The system is utilized in an effort to automate certain tasks that were previously performed manually. These tasks include detailed test configuration diagrams of systems under certification test in the ESTL, floorplan layouts of future planned laboratory reconfigurations, and other graphical documentation of division activities. The significant time savings achieved with this CAD/CAE system are examined: (1) input of drawings and diagrams; (2) editing of initial drawings; (3) accessibility of the data; and (4) added versatility. It is shown that the Applicon CAD/CAE system, with its ease of input and editing, the accessibility of data, and its added versatility, has made more efficient many of the necessary but often time-consuming tasks associated with engineering design and testing.

  2. Orbit Transfer Vehicle (OTV) advanced expander cycle engine point design study. Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Detailed computer models of the engine were developed to predict both the steady state and transient operation of the engine system. Mechanical design layout drawings were prepared for the following components: thrust chamber and nozzle; extendible nozzle actuating mechanism and seal; LOX turbopump and boost pump; hydrogen turbopump and boost pump; and the propellant control valves. The necessary heat transfer, stress, fluid flow, dynamic, and performance analyses were performed to support the mechanical design.

  3. 3. Photocopy of a drawing (original in the Collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Photocopy of a drawing (original in the Collection of the PL&C, Shelf 141, Drawing 25) --no date--SWAMP LOCKS AND LOCK CHAMBERS - Pawtucket Canal, Swamp Locks, Pawtucket & Merrimack Canals, Lowell, Middlesex County, MA

  4. 1. Photocopy of a drawing (original in the Collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of a drawing (original in the Collection of the PL&C, Shelf 117, Drawing 334)--no date--Labeled 'PROBABLY HICKEY HALL DAM & LOCKS' - Western Canal, Hickey Hall Dam, Lowell, Middlesex County, MA

  5. Iwahashi Zenbei's Sunspot Drawings in 1793 in Japan

    NASA Astrophysics Data System (ADS)

    Hayakawa, Hisashi; Iwahashi, Kiyomi; Tamazawa, Harufumi; Toriumi, Shin; Shibata, Kazunari

    2018-01-01

    Three Japanese sunspot drawings associated with Iwahashi Zenbei (1756 - 1811) are shown here from contemporary manuscripts and woodprint documents with the relevant texts. We reveal the observational date of one of the drawings to be 26 August 1793, and the overall observations lasted for over a year. Moreover, we identify the observational site for the dated drawing as Fushimi in Japan. We then compare Zenbei's observations with the group sunspot number and the raw group count from the Sunspot Index and Long-term Solar Observations (SILSO) to reveal the context of the data, and we conclude that these drawings fill gaps in our understanding that are due to the fragmental sunspot observations around 1793. These drawings are important as a clue to evaluate astronomical knowledge of contemporary Japan in the late eighteenth century and are valuable as a non-European observation, considering that most sunspot observations up to the middle of the nineteenth century are from Europe.

  6. 8. Photographic copy of construction drawing, dated January 10, 1962, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of construction drawing, dated January 10, 1962, Department of the Air Force Air Defense Command Installations for Selfridge, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ELEVATIONS AND SECTIONS, SLF 140-056 SHEET 3 OF 7. - Selfridge Field, Building No. 562, Ammo Road northeast of Taxiway A, Mount Clemens, Macomb County, MI

  7. 7. Photographic copy of construction drawing, dated January 10, 1962, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of construction drawing, dated January 10, 1962, Department of the Air Force Air Defense Command Installations for Selfridge, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ARCHITECTURAL PLAN AND SCHEDULES, SLF 140-056, SHEET 2 OF 7. - Selfridge Field, Building No. 562, Ammo Road northeast of Taxiway A, Mount Clemens, Macomb County, MI

  8. 88. AVALON DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    88. AVALON DAM - Photographic copy of construction drawing dated February 9, 1912 (from Record Group 115, Box 17, Denver Branch of the National Archives, Denver) METHOD OF CLOSING UP OLD GATE OPENINGS IN SPILLWAY AND ARRANGEMENT OF TURBINES, OPERATING CYLINDER GATES - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  9. 9. Photographic copy of construction drawing, dated October 29, 1958, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photographic copy of construction drawing, dated October 29, 1958, Giffels and Rossetti, Architects-Engineers, Detroit, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. STANDBY POWER UNIT, ARCHITECTURAL, ADDITION TO BLDG, 853, SHEET 3 OF 12. - Selfridge Field, Building No. 853, North of Taxiway H, east of North-South Runway, Mount Clemens, Macomb County, MI

  10. 6. Photographic copy of construction drawing, dated April 12, 1958, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of construction drawing, dated April 12, 1958, Germany S. Klees, Consulting Engineers, Detroit, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. MODIFICATION TO BUILDING NO. 559, ARCHITECTURAL ELEVATIONS AND DETAILS. - Selfridge Field, Building No. 559, South of East Joy Boulevard, east of North-South Runway, Mount Clemens, Macomb County, MI

  11. 192. Photocopy of drawing, Twin Falls Canal Company, date unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    192. Photocopy of drawing, Twin Falls Canal Company, date unknown. TOPOGRAPHICAL MAP (DAM DRAWN IN), MILNER SITE, TWIN FALLS COUNTY, MILNER, IDAHO; RIGHT SIDE OF MAP (LEFT ON ID-15-183). - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  12. 10. Photographic copy of copy of original construction drawing, dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of copy of original construction drawing, dated 1899?. Original in possession of Twin Lakes Reservoir and Canal Company, Ordway, Colorado. PLAN OF DAM AND HEAD GATES FOR THE TWIN LAKES RESERVOIR. - Twin Lakes Dam & Outlet Works, Beneath Twin Lakes Reservoir, T11S, R80W, S22, Twin Lakes, Lake County, CO

  13. 15. Photographic copy of construction drawing, dated June 7, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photographic copy of construction drawing, dated June 7, 1933, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-25??, SDO 134 F4 1B (ELEVATIONS) - Selfridge Field, Building Nos. 242, 247, 250, 242 & 247 Birch Street & 250 Wagner Street, Mount Clemens, Macomb County, MI

  14. 12. Photographic copy of construction drawing, dated June 7, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photographic copy of construction drawing, dated June 7, 1933, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2517, SDO 186 F41 (FLOOR PLAN) - Selfridge Field, Building Nos. 248, 252 & 254, 248 Birch Street & 252, 254 Wagner Street, Mount Clemens, Macomb County, MI

  15. 49. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. ELEVATIONS & DETAILS CROSS SECTION THROUGH COURTYARD SHOWING WEST ELEVATION OF ARCADE AT EAST SIDE, REAR (EAST) ELEVATION OF BUILDING; SHEET NO. 7 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  16. 111. Photocopy of original construction drawing, dated 31 January 1935 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    111. Photocopy of original construction drawing, dated 31 January 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (T-1-28) PROPOSED MODEL OF DIFFUSING CHAMBERS AND GRATINGS FOR POWERHOUSE FISHWAY AND FISH LADDERS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  17. 6. PHOTOGRAPHIC COPY OF ORIGINAL CONSTRUCTION DRAWING, DATED MAY 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. PHOTOGRAPHIC COPY OF ORIGINAL CONSTRUCTION DRAWING, DATED MAY 15, 1919, 7TH CAVALRY CANTONMENT POST EXCHANGE, WAR DEPARTMENT, CONSTRUCTION DIVISION, PLAN No. 357, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  18. 5. PHOTOGRAPHIC COPY OF ORIGINAL CONSTRUCTION DRAWING, DATED JUNE 14, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. PHOTOGRAPHIC COPY OF ORIGINAL CONSTRUCTION DRAWING, DATED JUNE 14, 1919, 7TH CAVALRY CANTONMENT MESS BUILDING, WAR DEPARTMENT, CONSTRUCTION DIVISION, PLAN No. 316A, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  19. 41. INDEX OF ALL TAN 629 HANGAR DRAWINGS IN THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. INDEX OF ALL TAN 629 HANGAR DRAWINGS IN THE RALPH M. PARSONS SERIES OF DRAWINGS OF THE FLIGHT ENGINE TEST FACILITY. RALPH M. PARSONS DRAWING NUMBER: 1229-2 ANP/GE 5-100. DATED MARCH 15, 1957. - Idaho National Engineering Laboratory, Test Area North, Hangar No. 629, Scoville, Butte County, ID

  20. 7. Photographic copy of construction drawing, dated Janaury 29, 1965, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of construction drawing, dated Janaury 29, 1965, Department of the Air Force Air Defense Command Civil Engineering, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. Architectural details of new enclosed porches, sheets 2 of 7, SLF 740-090 - Selfridge Field, Building Nos. 237 & 238, 237 & 238 George Avenue: Harrison Township, Mount Clemens, Macomb County, MI

  1. 7. Photographic copy of construction drawing, dated December 13, 1967, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of construction drawing, dated December 13, 1967, Department of the Air Force, Air Defense Command, Civil Engineering, Selfridge, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. GEEIA CONSOLE SUPPORT CONTROL TOWER BUILDING 559, SECTIONS, ELEVATIONS. - Selfridge Field, Building No. 559, South of East Joy Boulevard, east of North-South Runway, Mount Clemens, Macomb County, MI

  2. 7. Photographic copy of drawing, dated August 1924, in possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of drawing, dated August 1924, in possession of SCIP office, Coolidge, AZ. United States Indian Service, Irrigation. Design by Neuffer. FLORENCE-CASA GRANDE CANAL, CHINA WASH FLUME, CROSS SECTION - San Carlos Irrigation Project, China Wash Flume, Main (Florence-Case Grande) Canal at Station 137+00, T4S, R10E, S14, Coolidge, Pinal County, AZ

  3. 50. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. EXTERIOR DETAILS DETAIL ELEVATION, PLAN, AND WALL CROSS SECTION AT FRONT ENTRANCE PORTICO; EXTERIOR WALL AND OPENING DETAILS; AND OTHER EXTERIOR DETAILS; SHEET NO. 8 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  4. 124. Photocopy of original construction drawing, dated 12 October 1935 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    124. Photocopy of original construction drawing, dated 12 October 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (T-3-83, Sheet 1 of 6) COLLECTION CHANNEL DETAILS: WOOD GRATING AND BAFFLES IN DIFFUSION CHAMBERS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  5. 7. PHOTOGRAPHIC COPY OF ORIGINAL CONSTRUCTION DRAWING, DATED 1918, HORIZONAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. PHOTOGRAPHIC COPY OF ORIGINAL CONSTRUCTION DRAWING, DATED 1918, HORIZONAL SLIDING WINDOW DETAIL, WAR DEPARTMENT, MANUAL OF THE CONSTRUCTION DIVISION OF THE ARMY, WAR EMERGENCY CONSTRUCTION, SECTION C, ENGINEERING DIVISION, PLATE 5, CONSOLIDATED SUPPLY COMPANY PRINTERS, WASHINGTON - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  6. A compact rail-to-rail CMOS buffer amplifier with very low quiescent current

    NASA Astrophysics Data System (ADS)

    Arslan, Emre; Yıldız, Merih; Minaei, Shahram

    2015-06-01

    In this work, a very compact, rail-to-rail, high-speed buffer amplifier for liquid crystal display (LCD) applications is proposed. Compared to other buffer amplifiers, the proposed circuit has a very simple architecture, occupies a small number of transistors and also has a large driving capacity with very low quiescent current. It is composed of two complementary differential input stages to provide rail-to-rail driving capacity. The push-pull transistors are directly connected to the differential input stage, and the output is taken from an inverter. The proposed buffer circuit is laid out using Mentor Graphics IC Station layout editor using AMS 0.35 μm process parameters. It is shown by post-layout simulations that the proposed buffer can drive a 1 nF capacitive load within a small settling time under a full voltage swing, while drawing only 1.6 μA quiescent current from a 3.3 V power supply.

  7. Physical Science Informatics: Providing Open Science Access to Microheater Array Boiling Experiment Data

    NASA Technical Reports Server (NTRS)

    McQuillen, John; Green, Robert D.; Henrie, Ben; Miller, Teresa; Chiaramonte, Fran

    2014-01-01

    The Physical Science Informatics (PSI) system is the next step in this an effort to make NASA sponsored flight data available to the scientific and engineering community, along with the general public. The experimental data, from six overall disciplines, Combustion Science, Fluid Physics, Complex Fluids, Fundamental Physics, and Materials Science, will present some unique challenges. Besides data in textual or numerical format, large portions of both the raw and analyzed data for many of these experiments are digital images and video, requiring large data storage requirements. In addition, the accessible data will include experiment design and engineering data (including applicable drawings), any analytical or numerical models, publications, reports, and patents, and any commercial products developed as a result of the research. This objective of paper includes the following: Present the preliminary layout (Figure 2) of MABE data within the PSI database. Obtain feedback on the layout. Present the procedure to obtain access to this database.

  8. Spatially resolved synchrotron radiation induced X-ray fluorescence analyses of rare Rembrandt silverpoint drawings

    NASA Astrophysics Data System (ADS)

    Reiche, I.; Radtke, M.; Berger, A.; Görner, W.; Merchel, S.; Riesemeier, H.; Bevers, H.

    2006-05-01

    New analyses of a series of very rare silverpoint drawings that were executed by Rembrandt Harmensz. van Rijn (1606 1669) which are kept today in the Kupferstichkabinett (Museum of Prints and Drawings) of the State Museums of Berlin are reported here. Analysis of these drawings requires particular attention because the study has to be fully non-destructive and extremely sensitive. The metal alloy on the paper does not exceed some hundreds of μg/cm2. Therefore, synchrotron radiation induced X-ray fluorescence (SR-XRF) is together with external micro-proton-induced X-ray emission the only well-suited method for the analyses of metalpoint drawings. In some primary work, about 25 German and Flemish metalpoint drawings were investigated using spatially resolved SR-XRF analysis at the BAMline at BESSY. This study enlarges the existing French German database of metalpoint drawings dating from the 15th and 16th centuries, as these Rembrandt drawings originate from the 17th century where this graphical technique was even rarer and already obsolete. It also illustrates how SR-XRF analysis can reinforce art historical assumptions on the dating of drawings and their connection.

  9. Structure A, steel shelving. Drawing no. H3300. Original drawing by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Structure A, steel shelving. Drawing no. H3-300. Original drawing by Black & Veatch, Consulting Engineers, Kansas City, Missouri, prepared for the U.S. Department of the Army, Office of Engineers, Military Construction Division, Washington D.C. dated November 5, 1951. - Travis Air Force Base, Building No. 925, W Street, Fairfield, Solano County, CA

  10. The Octet Rules: A Dating Game for Atoms

    ERIC Educational Resources Information Center

    Welborn, Jennifer

    2004-01-01

    To develop student interest in the periodic table, the author developed a simple, but fun, role-playing activity. This play is used after students have learned the basic structure of atoms and the general layout of the periodic table. It also comes after students have learned the basics of ionic and covalent bonding. The basic idea of bonding is…

  11. 45 CFR Appendix D to Part 1355 - Foster Care and Adoption Record Layouts

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... periodic review 8 06 II.A. Child's date of birth 8 07 II.B. Sex 1 08 II.C.1. Race 08a American Indian or... DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL Pt...

  12. 45 CFR Appendix D to Part 1355 - Foster Care and Adoption Record Layouts

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... periodic review 8 06 II.A. Child's date of birth 8 07 II.B. Sex 1 08 II.C.1. Race 08a American Indian or... DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL Pt...

  13. 7. Photographic copy of the original construction drawing, dated June ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of the original construction drawing, dated June 1934, from the linens in possession of U.S. Army Engineers, Rock Island District, Clock Tower Building, Arsenal Island, Rock Island, Illinois. MISSISSIPPI RIVER, LOCK AND DAM NO. 15, LOCK OPERATOR'S SHELTER HOUSE, ELEVATIONS AND PLANS - Locks & Dam No. 15, Locks Operator's Shelter House, Arsenal Island, Upper Mississippi River, Rock Island, Rock Island County, IL

  14. 8. Photographic copy of the original construction drawing dated June ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of the original construction drawing dated June 1934, from the linens in possession of U.S. Army Engineers, Rock Island District, Clock Tower Building, Arsenal Island, Rock Island, Illinois. MISSISSIPPI RIVER, LOCK AND DAM NO. 15, LOCK OPERATOR'S SHELTER HOUSE, SECTIONS AND DETAILS - Locks & Dam No. 15, Locks Operator's Shelter House, Arsenal Island, Upper Mississippi River, Rock Island, Rock Island County, IL

  15. 8. Copy of construction drawing, dated May 28, 1974, Selfridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Copy of construction drawing, dated May 28, 1974, Selfridge ANG Base, Civil Engineering, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. CONVERSION/ALTERATION OF EXISTING HEATING PLANTS, MECHANICAL, DEMOLITION, BUILDING 122, PLAN NO. SLF 140-108, SHEETS 12, 13, 14, 15 OF 29. - Selfridge Field, Building No. 122, North of Wilbur Wright Boulevard between Walnut & Birch Streets, Mount Clemens, Macomb County, MI

  16. Solving a mathematical model integrating unequal-area facilities layout and part scheduling in a cellular manufacturing system by a genetic algorithm.

    PubMed

    Ebrahimi, Ahmad; Kia, Reza; Komijan, Alireza Rashidi

    2016-01-01

    In this article, a novel integrated mixed-integer nonlinear programming model is presented for designing a cellular manufacturing system (CMS) considering machine layout and part scheduling problems simultaneously as interrelated decisions. The integrated CMS model is formulated to incorporate several design features including part due date, material handling time, operation sequence, processing time, an intra-cell layout of unequal-area facilities, and part scheduling. The objective function is to minimize makespan, tardiness penalties, and material handling costs of inter-cell and intra-cell movements. Two numerical examples are solved by the Lingo software to illustrate the results obtained by the incorporated features. In order to assess the effects and importance of integration of machine layout and part scheduling in designing a CMS, two approaches, sequentially and concurrent are investigated and the improvement resulted from a concurrent approach is revealed. Also, due to the NP-hardness of the integrated model, an efficient genetic algorithm is designed. As a consequence, computational results of this study indicate that the best solutions found by GA are better than the solutions found by B&B in much less time for both sequential and concurrent approaches. Moreover, the comparisons between the objective function values (OFVs) obtained by sequential and concurrent approaches demonstrate that the OFV improvement is averagely around 17 % by GA and 14 % by B&B.

  17. 32. Photograph of microfiched construction drawing by U.S. Public Health ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. Photograph of microfiched construction drawing by U.S. Public Health Service, Treasury Department, dated April 13, 1925. (Microfiched drawing located at the Denver Service Center, #113/41904) SEWAGE FILTER PLANT-SECTIONS AND DETAILS, - Water Reclamation Plant, Grand Canyon, Coconino County, AZ

  18. The Mishin mission, December 1962 - December 1993

    NASA Astrophysics Data System (ADS)

    Vick, Charles P.

    1994-09-01

    Despite the large amount of information that has now emerged on the Soviet manned Lunar effort, many unanswered questions remain about hardware and poorly defined historical related questions. Only about 45% of the full program story had been told and officially released as of the end of 1993. Much of the program still remains secret, but thanks to seven direct meetings with retired General Chief Designer Acad. V. P. Mishin many hardware questions have been answered. It has now become possible to define the L3 spacecraft hardware details precisely. Three of the drawings were, by request, signed by Acad. V. P. Mishin even though they were still undergoing revisions. He had specified changes which have been completed and registered copies for himself. Subsequent changes were made in the light of actual photographs of the hardware and discussions with the individual component designers for precise working understanding of the details. This proved critical in understanding the docking systems design configuration details. The results is a series of drawings on the Soviet manned Lunar program hardware reflecting many years of research, though only part of the total series of drawings that have been developed on the programmes physical layout. Detail diagrams for the following systems are presented. (1) The Soviet Manned Lunar Landing Spacecraft L-3 and Manned Circumnavigation Spacecraft Zond 7K-L1; (2) The N1 Soviet Manned Lunar Program booster systems layout for the L3 payload; (3) The N1-L3 competitors UR-700, UR-700M (UR 900) and R-56. The N1-L3 featured for comparison is the 1969 design variant. Also shown is Proton LK-1 that evolved to Proton Zoned SL-12; and (4) N1-L3 and the N1-L3M compared with the Saturn-V and the G-1-e design concept.

  19. A 205GHz Amplifier in 90nm CMOS Technology

    DTIC Science & Technology

    2017-03-01

    San Jose State University San Jose, CA, USA       Abstract: This paper presents a 205GHz amplifier drawing 43.4mA from a 0.9V power supply with...10.5dB power gain, Psat of -1.6dBm, and P1dB ≈ -5.8dBm in a standard 90nm CMOS process. Moreover, the design employs internal (layout-based) /external...reported in [2]. In this paper, two neutralization techniques, internal and external approaches, have been implemented to achieve higher power

  20. Development of a preprototype times wastewater recovery subsystem, addendum

    NASA Technical Reports Server (NTRS)

    Dehner, G. F.

    1984-01-01

    Six tasks are described reflecting subsystem hardware and software modifications and test evaluation of a TIMES wastewater recovery subsystem. The overall results are illustrated in a figure which shows the water production rate, the specific energy corrected to 26.5 VDC, and the product water conductivity at various points in the testing. Four tasks are described reflecting studies performed to develop a preliminary design concept for a next generation TIMES. The overall results of the study are the completion of major design analyses and preliminary configuration layout drawings.

  1. 41. Photocopy of microfiched construction drawing by Galloway & Markwart ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photocopy of microfiched construction drawing by Galloway & Markwart Engineers, San Francisco, California, dated Feb. 9, 1918. (Microfiched drawing located at the Denver Service Center, #104/60154 - 18 of 18) PLAN OF ELECTRICAL EQUIPMENT - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA

  2. 47. Photocopy of microfiched construction drawing by Yosemite National Park, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. Photocopy of microfiched construction drawing by Yosemite National Park, California, date unknown. (Microfiched drawing located at the Denver Service Center, #104/5048). ELECTRIC DISTRIBUTION SYSTEM (SHEET 2 OF 2, Weastern Section). - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA

  3. 46. Photocopy of microfiched construction drawing by Yosemite National Park, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. Photocopy of microfiched construction drawing by Yosemite National Park, California, date unknown. (Microfiched drawing located at the Denver Service Center, #104/5048). ELECTRIC DISTRIBUTION SYSTEM (SHEET 1 OF 2, Eastern Section). - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA

  4. 34. AS BUILT DRAWING OF TAN 629 HANGAR SHOWING NORTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. AS BUILT DRAWING OF TAN 629 HANGAR SHOWING NORTH AND SOUTH ELEVATIONS. RALPH M. PARSONS DRAWING NUMBER: 1229-2 ANP/GE 5-629-A-3. DATED MARCH 15, 1957. - Idaho National Engineering Laboratory, Test Area North, Hangar No. 629, Scoville, Butte County, ID

  5. EBR-II Data Digitization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yoon, Su-Jong; Rabiti, Cristian; Sackett, John

    2014-08-01

    1. Objectives To produce a validation database out of those recorded signals it will be necessary also to identify the documents need to reconstruct the status of reactor at the time of the beginning of the recordings. This should comprehends the core loading specification (assemblies type and location and burn-up) along with this data the assemblies drawings and the core drawings will be identified. The first task of the project will be identify the location of the sensors, with respect the reactor plant layout, and the physical quantities recorded by the Experimental Breeder Reactor-II (EBR-II) data acquisition system. This firstmore » task will allow guiding and prioritizing the selection of drawings needed to numerically reproduce those signals. 1.1 Scopes and Deliverables The deliverables of this project are the list of sensors in EBR-II system, the identification of storing location of those sensors, identification of a core isotopic composition at the moment of the start of system recording. Information of the sensors in EBR-II reactor system was summarized from the EBR-II system design descriptions listed in Section 1.2.« less

  6. 48. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. ELEVATIONS CROSS SECTIONS THROUGH COURTYARD SHOWING EAST ELEVATION OF FRONT (WEST) PORTION OF BUILDING, SOUTH ELEVATION OF NORTH WING, NORTH ELEVATION OF SOUTH WING, PLOT PLAN, AND DETAILS; SHEET NO. 6 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  7. 6. Photographic copy of blueprint dated 1929; Henschien & McLaren, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of blueprint dated 1929; Henschien & McLaren, Chicago, architects; Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloo, Iowa; PLAN OF KILLING FLOOR IN 1929 BEEF HOUSE; CATTLE WERE SKINNED ON THE FLOOR IN PRITCHING AREA NEAR CENTER OF DRAWING - Rath Packing Company, Cooler Building-1929 Beef House, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  8. 76 FR 73491 - Airworthiness Directives; McDonnell Douglas Corporation Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... issued revised service rework drawings to clarify the repair instructions. These service rework drawings... have updated the references in paragraph (g) of this AD to include Boeing DC-10-10 Service Rework... DC-10-10 Service Rework Drawing SR10570048, Revision K, dated October 7, 2010, including Parts List...

  9. 29. Photocopy of drawing L1314 showing detail of columns for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photocopy of drawing L-1314 showing detail of columns for filtered water reservoir at the Baldwin Filtration Plant. Drawing in Utilities Engineering Department, Cleveland and is dated 1924. - Division Avenue Pumping Station & Filtration Plant, West 45th Street and Division Avenue, Cleveland, Cuyahoga County, OH

  10. 5. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, IL Veterans Administration Medical Center. PLOT PLAN; DRAWING 1R, DATED SEPTEMBER 4, 1940. (8 x 10 negative) - Veterans Administration Medical Center, Old State Route 13 West, Marion, Williamson County, IL

  11. 35. AS BUILT DRAWING OF TAN 629 HANGAR SHOWING EAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. AS BUILT DRAWING OF TAN 629 HANGAR SHOWING EAST AND WEST ELEVATIONS AND OTHER DETAILS. RALPH M. PARSONS DRAWING NUMBER: 1229-2 ANP/GE 5-629-A-4. DATED MARCH 15, 1957. - Idaho National Engineering Laboratory, Test Area North, Hangar No. 629, Scoville, Butte County, ID

  12. 18. Photocopy of copy of drawing of boiler plant and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of copy of drawing of boiler plant and shops building, dated June 15, 1944. Copy of drawing stored at 436 Civil Engineer Squadron, Design Management Element Cece, 600 8th Street, Dover AFB, DE - Dover Air Force Base, Hangar No. 1301, Dover, Kent County, DE

  13. 137. ARAII Building ARA602 floor plan as it appeared in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    137. ARA-II Building ARA-602 floor plan as it appeared in 1980 when electrical modifications were being made. Shows partial layout of floor plan. EG&G Idaho, Inc. 1570-ARA-II-602-E-3. Date: April 1980. Ineel index code no. 070--0602-10-220-159761. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  14. 3. "TEST STAND NO. 13, EXCAVATION PLAN & SECTIONS." Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. "TEST STAND NO. 1-3, EXCAVATION PLAN & SECTIONS." Specifications No. ENG 04-353-50-10; Drawing No. 60-0906; no sheet number within title block; D.O. SERIES 1109/10. Stamped: AS BUILT. No revisions or revision dates. Last work date on this drawing "Checked by EAG, 1/31/49." Though this drawing is specific to Test Stand 1-3, it also illustrates the general methods used for excavation design and retaining wall construction at Test Stand 1-5. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-3, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  15. Schematic representation of residue-based protein context-dependent data: an application to transmembrane proteins.

    PubMed

    Campagne, F; Weinstein, H

    1999-01-01

    An algorithmic method for drawing residue-based schematic diagrams of proteins on a 2D page is presented and illustrated. The method allows the creation of rendering engines dedicated to a given family of sequences, or fold. The initial implementation provides an engine that can produce a 2D diagram representing secondary structure for any transmembrane protein sequence. We present the details of the strategy for automating the drawing of these diagrams. The most important part of this strategy is the development of an algorithm for laying out residues of a loop that connects to arbitrary points of a 2D plane. As implemented, this algorithm is suitable for real-time modification of the loop layout. This work is of interest for the representation and analysis of data from (1) protein databases, (2) mutagenesis results, or (3) various kinds of protein context-dependent annotations or data.

  16. 28. Photocopy of microfiched construction drawing by Pelton Water Wheel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Photocopy of microfiched construction drawing by Pelton Water Wheel Company, San Francisco, California, dated May 6, 1947. (Microfiched drawing located at the Denver Service Center, #104/601 54 - 2 of 18) LONGITUDINAL SECTION OF RECONSTRUCTED TURBINE UNIT NO. 2 - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA

  17. 32. Photocopy of microfiched construction drawing by Pelton Water Wheel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. Photocopy of microfiched construction drawing by Pelton Water Wheel Company, San Francisco, California, dated 4-19-47. (Microfiched drawing located at the Denver Service Center, #104/60154 - 6 of 18) LONGITUDINAL SECTION OF 31' SINGLE DISCHARGE PELTON-FRANCIS TURBINE. - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA

  18. 17. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, IL Veterans Administration Medical Center. FRONT (NORTH) ELEVATION; DRAWING 1-7R, DATED SEPTEMBER 4, 1940. (8 x 10 negative) - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL

  19. 1. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, Illinois Veterans Administration Medical Center. (PLANS & ELEVATIONS); DRAWING 14-1R, DATED SEPTEMBER 4, 1940. (8 x 10 negative) - Veterans Administration Medical Center, Building No. 14, Old State Route 13 West, Marion, Williamson County, IL

  20. 4. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, Illinois Veterans Administration Medical Center. (PLANS, ELEVATIONS & DETAILS); DRAWING 8-1R, DATED SEPTEMBER 4, 1940. (8 x 10 negative) - Veterans Administration Medical Center, Building No. 8, Old State Route 13 West, Marion, Williamson County, IL

  1. 18. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, IL Veterans Administration Medical Center. SIDE (EAST) ELEVATION & SIDE (WEST) ELEVATION; DRAWING 1-9R, DATED SEPTEMBER 4, 1940. - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL

  2. 23. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, IL Veterans Administration Medical Center. TYPICAL LOBBY DETAILS; DRAWING 1-21R, DATED SEPTEMBER 4, 1940. (8 x 10 negative) - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL

  3. 4. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photograph of a line drawing in the possession of the Engineer's office of the Marion, Illinois Veterans Administration Medical Center. (PLANS, ELEVATIONS & DETAILS); DRAWING 13-1R, DATED SEPTEMBER 4, 1940. (8 x 10 negative) - Veterans Administration Medical Center, Building No. 13, Old State Route 13 West, Marion, Williamson County, IL

  4. 1. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, Illinois Veterans Administration Medical Center. (PLAN, ELEVATIONS, & SECTIONS); DRAWING 15-1R, DATED SEPTEMBER 4, 1940. (8 x 10 negative) - Veterans Administration Medical Center, Building No. 15, Old State Route 13 West, Marion, Williamson County, IL

  5. 22. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, IL Veterans Administration Medical Center. MAIN LOBBY & ELEVATOR LOBBY DETAILS; DRAWING 1-20R, DATED SEPTEMBER 4, 1940. - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL

  6. 36. AS BUILT DRAWING OF TAN 629 HANGAR SHOWING FLOOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. AS BUILT DRAWING OF TAN 629 HANGAR SHOWING FLOOR PLAN AND VICINITY PLAN RELATIONSHIP TO ADMINISTRATION AND MAINTENANCE AREA. RALPH M. PARSONS DRAWING NUMBER: 1229-2 ANP/GE 5-629-A-2. DATED MARCH 15, 1957. - Idaho National Engineering Laboratory, Test Area North, Hangar No. 629, Scoville, Butte County, ID

  7. Photograph of drawing building 523 and 100,000gallon water tank above ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photograph of drawing building 523 and 100,000-gallon water tank above it, dated 1979. Drawing in collection of Caretaker Site Office, Philadelphia Naval Business Center. - Naval Base Philadelphia-Philadelphia Naval Shipyard, Building No. 523, Delaware Avenue between East Fourth Street & Webster Avenue, League Island, Philadelphia, Philadelphia County, PA

  8. 30. Photocopy of microfiched construction drawing by Pelton Water Wheel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Photocopy of microfiched construction drawing by Pelton Water Wheel Company, San Francisco, California, dated 6-24-31. (Microfiched drawing located at the Denver Service Center, #104/60154 - 4 of 18) 0-3 & 0-5 GOVERNORS, CHART OF PIECE NUMBERS - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA

  9. 78 FR 72023 - Drawbridge Operation Regulation; Genessee River, Rochester, NY

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Bridge that once required draw operations in 33 CFR 117.785 was removed from the waterway in 2013... effective date. This rule removes the CSX Transportation Bridge draw operation requirements under 33 CFR 117... the regulatory burden related to the draw operations for this bridge that is no longer in existence...

  10. 16. Photocopy of drawing # F1103 in files of Utilities ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photocopy of drawing # F-1103 in files of Utilities Engineering Department in Cleveland showing water flow diagram in the Division Avenue Plant. Drawing dated March 11, 1921. Flow is still in existence. - Division Avenue Pumping Station & Filtration Plant, West 45th Street and Division Avenue, Cleveland, Cuyahoga County, OH

  11. ARCHITECTURAL DRAWING, MILITARY AIR COMMAND COMMUNICATION CENTER PRECAST CONCRETE WALL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL DRAWING, MILITARY AIR COMMAND COMMUNICATION CENTER PRECAST CONCRETE WALL DETAILS. DATED 03/15/1971 - Wake Island Airfield, Terminal Building, West Side of Wake Avenue, Wake Island, Wake Island, UM

  12. 15. Photocopy of engineering drawing F790 in files of Utilities ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photocopy of engineering drawing F-790 in files of Utilities Engineering files in Cleveland of the Allis-Chambers steam engine. This side elevation of the engine in the Division Avenue plant is the last remaining drawing of them in existence. The engine was dismantled. Date of drawing is 1914. - Division Avenue Pumping Station & Filtration Plant, West 45th Street and Division Avenue, Cleveland, Cuyahoga County, OH

  13. Marker optimization for facial motion acquisition and deformation.

    PubMed

    Le, Binh H; Zhu, Mingyang; Deng, Zhigang

    2013-11-01

    A long-standing problem in marker-based facial motion capture is what are the optimal facial mocap marker layouts. Despite its wide range of potential applications, this problem has not yet been systematically explored to date. This paper describes an approach to compute optimized marker layouts for facial motion acquisition as optimization of characteristic control points from a set of high-resolution, ground-truth facial mesh sequences. Specifically, the thin-shell linear deformation model is imposed onto the example pose reconstruction process via optional hard constraints such as symmetry and multiresolution constraints. Through our experiments and comparisons, we validate the effectiveness, robustness, and accuracy of our approach. Besides guiding minimal yet effective placement of facial mocap markers, we also describe and demonstrate its two selected applications: marker-based facial mesh skinning and multiresolution facial performance capture.

  14. As-built data capture of complex piping using photogrammetry technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morray, J.P.; Ziu, C.G.

    1995-11-01

    Plant owners face an increasingly difficult and expensive task of updating drawings, both regarding the plant logic and physical layout. Through the use of photogrammetry technology, H-H spectrum has created a complete operating plant data capture service, with the result that the task of recording accurate plant configurations has become assured and economical. The technology has proven to be extremely valuable for the capture of complex piping configurations, as well as entire plant facilities, and yields accuracy within 1/4 inch. The method uses photographs and workstation technology to quickly document and compute the plant layout, with all components, regardless ofmore » size, included in the resulting model. The system has the capability to compute actual 3-D coordinates of any point based on previous triangulations, allowing for an immediate assessment of accuracy. This ensures a consistent level of accuracy, which is impossible to achieve in a manual approach. Due to the speed of the process, the approach is very important in hazardous/difficult environments such as nuclear power facilities or offshore platforms.« less

  15. 44. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown FIRST FLOOR PLAN - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA

  16. 45. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown SECOND FLOOR PLAN - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA

  17. 51. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown EXTERIOR, ELEVATION DETAILS - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA

  18. 46. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown NORTH ELEVATION - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA

  19. 47. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angleles, CA, Photographer, Date unknown WEST ELEVATION - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA

  20. Note: Views 2846 are photographic copies of architectural drawings (black ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Note: Views 28-46 are photographic copies of architectural drawings (black India ink on blue imperial cloth Irish linen by the Shrourds-Stoner firm, dated July 19, 1924. The original drawings are located in the Indiana State University Archives. - John T. Beasley Building, 632 Cherry Street (between Sixth & Seventh Streets), Terre Haute, Vigo County, IN

  1. 21. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, IL Veterans Administration Medical Center. 3/4' SCALE DETAIL - MAIN ENTRANCE UNIT, HALF ELEVATION & SECTION; DRAWING 1-15R, DATED SEPTEMBER 4, 1940. - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL

  2. 19. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, IL Veterans Administration Medical Center. DETAILS MAIN STEPS & PLATFORM (SIDE ELEVATION, HALF PLAN, SECTIONS); DRAWING 1-12R, DATED SEPTEMBER 4, 1940. - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL

  3. 4. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, Illinois Veterans Administration Medical Center. WEST ELEVATION, SOUTH ELEVATION, EAST ELEVATION, NORTH ELEVATION; DRAWING 2-3R, DATED SEPTEMBER 4, 1940. (8 x 10 negative) - Veterans Administration Medical Center, Building No. 2, Old State Route 13 West, Marion, Williamson County, IL

  4. Structure A, reinforcing details. Drawing No. H2302, as built, Original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Structure A, reinforcing details. Drawing No. H2-302, as built, Original drawing by Black & Veatch, Consulting Engineers, Kansas City, Missouri, prepared for the U.S. Department of the Army, Office of Engineers, Military Construction Division, Washington, D.C. dated October 1, 1951. - Travis Air Force Base, Building No. 925, W Street, Fairfield, Solano County, CA

  5. Life sciences payload definition and integration study. Volume 1: Executive summary. [carry-on laboratory for Spacelab

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The definition and integration tasks involved in the development of design concepts for a carry-on laboratory (COL), to be compatible with Spacelab operations, were divided into the following study areas: (1) identification of research and equipment requirements of the COL; (2) development of a number of conceptual layouts for COL based on the defined research of final conceptual designs; and (4) development of COL planning information for definition of COL/Spacelab interface data, cost data, and program cost schedules, including design drawings of a selected COL to permit fabrication of a functional breadboard.

  6. Digital Group Multiplexers (DGM). Volume 2. Section 3.0, 5.0, 7.0, 15.4

    DTIC Science & Technology

    1980-02-01

    y~ . 7 3.3.10 Reliability Design The LGM has a specified MTBF of 3000 hours. This is equivalent to 333 6 failures in 10 hours. The reliability...layouts of the RLGM mechanical assembly. 5-52 5.3. 11 Reliability Design The RLGM has a specified MTBF of 4000 hours. This is equivalent to 250 failures in...in the DGM Family interface Control Drawing to 100 ohms .:aximum 300 Hz to I KHz; 58 ohms 1 !50 1 K.1z to 3 Mtz. The current design do,.- not affect

  7. 49. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown SECTION THROUGH BUILDING, LOOKING EAST - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA

  8. 48. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA., Photographer, Date unknown SECTION THROUGH BUILDING, LOOKING NORTH - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA

  9. 7. Photocopy of drawing (Original in collection of the Department ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of drawing (Original in collection of the Department of Treasury) William Martin Aiken, Supervising architect, date unknown TOWER - U.S. Post Office Department, 1100 Pennsylvania Avenue Northwest, Washington, District of Columbia, DC

  10. 69. Photograph of line drawing. ISOMETRIC VIEW OF 500,000 POUND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    69. Photograph of line drawing. ISOMETRIC VIEW OF 500,000 POUND STATIC TEST FACILITY, NO DATE - White Sands Missile Range, V-2 Rocket Facilities, Near Headquarters Area, White Sands, Dona Ana County, NM

  11. 72. Photograph of line drawing. SOUTH ELEVATION OF MOTOR CARRIAGE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    72. Photograph of line drawing. SOUTH ELEVATION OF MOTOR CARRIAGE, 500,000 POUND STATIC TEST FACILITY, NO DATE - White Sands Missile Range, V-2 Rocket Facilities, Near Headquarters Area, White Sands, Dona Ana County, NM

  12. 73. New addition building 500 floor plan, drawing number AW600201, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    73. New addition building 500 floor plan, drawing number AW-60-02-01, dated 26 January, 1970 - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE

  13. 72. SAC control center underground structure lower floor plan, drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    72. SAC control center underground structure lower floor plan, drawing number 32-02-03, dated 1 February 1955 - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE

  14. 52. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown DETAILS OF MAIN FLOOR ELEVATOR LOBBY - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA

  15. 50. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angleles, CA, Photographer, Date unknown ENTRANCE AND TYPICAL BAY ON FLOWER STREET - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA

  16. 53. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown DETAILS OF CORRIDORS ON SECOND - TWELFTH FLOORS - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA

  17. 9. Photocopy of drawing (Original in possession of National Archives ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of drawing (Original in possession of National Archives and Record Service, Record Group 92) Delineator unknown, Date unknown FIRST FLOOR PLAN - Omaha Quartermaster Depot Historic District, Twenty-second & Woolworth Streets, Omaha, Douglas County, NE

  18. 8. Photocopy of drawing (Original in possession of National Archives ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of drawing (Original in possession of National Archives and Record Service, Record Group 92) Delineator unknown, Date unknown BASEMENT FLOOR PLAN - Omaha Quartermaster Depot Historic District, Twenty-second & Woolworth Streets, Omaha, Douglas County, NE

  19. 10. Photocopy of drawing (Original in possession of National Archives ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of drawing (Original in possession of National Archives and Record Service, Record Group 92) Delineator unknown, Date unknown SECOND FLOOR PLAN - Omaha Quartermaster Depot Historic District, Twenty-second & Woolworth Streets, Omaha, Douglas County, NE

  20. 9. Photocopy of 1940 architectural drawing titled: 'Alternations & Additions ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of 1940 architectural drawing titled: 'Alternations & Additions to (4290) Hosital, Sections' includes section and elevation views. Dated 4-12-40. HABS film is a high-contrast 8x10' negative made from original drawing in the collection of Housing and Engineering Services, Fort Lewis, WA. - Fort Lewis, Post Hospital, Near Ninth Division Drive & Idaho Avenue, DuPont, Pierce County, WA

  1. White House Communications Agency (WHCA) Presidential Voice Communications Rack Mount System Mechanical Drawing Package

    DTIC Science & Technology

    2015-12-01

    Rack Mount System Mechanical Drawing Package by Steven P Callaway Approved for public release; distribution unlimited...Laboratory White House Communications Agency (WHCA) Presidential Voice Communications Rack Mount System Mechanical Drawing Package by Steven P...Note 3. DATES COVERED (From - To) 04/2013 4. TITLE AND SUBTITLE White House Communications Agency (WHCA) Presidential Voice Communications Rack

  2. 6. Historic American Buildings Survey Photocopy of ink on linen ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Historic American Buildings Survey Photocopy of ink on linen drawing dated 1878, Longfellow & Clark, in possession of owner, 70 Sparks Street, Cambridge Street, Massachusetts SOUTH ELEVATION DRAWING - Edward S. Dodge House, 70 Sparks Street, Cambridge, Middlesex County, MA

  3. 7. Historic American Buildings Survey Photocopy of ink on linen ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Historic American Buildings Survey Photocopy of ink on linen drawing dated 1878, Longfellow & Clark, in possession of owner, 70 Sparks Street, Cambridge Street, Massachusetts EAST ELEVATION DRAWING - Edward S. Dodge House, 70 Sparks Street, Cambridge, Middlesex County, MA

  4. 8. Historic American Buildings Survey Photocopy of ink on linen ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Historic American Buildings Survey Photocopy of ink on linen drawing dated 1878, Longfellow & Clark, in possession of owner, 70 Sparks Street, Cambridge Street, Massachusetts NORTH ELEVATION DRAWING - Edward S. Dodge House, 70 Sparks Street, Cambridge, Middlesex County, MA

  5. 5. Historic American Buildings Survey Photocopy of ink on linen ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Historic American Buildings Survey Photocopy of ink on linen drawing dated 1878, Longfellow & Clark, in possession of owner, 70 Sparks Street, Cambridge Street, Massachusetts WEST ELEVATION DRAWING - Edward S. Dodge House, 70 Sparks Street, Cambridge, Middlesex County, MA

  6. 1. Photocopy of measured drawing (original delineated by the Royal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of measured drawing (original delineated by the Royal Danish Academy of Fine Arts (Kunstakademiets), Copenhagen, Denmark, 1961) Photographer and date of photograph unknown HOSPITALSGADE (FRONT) ELEVATION - Hospitalsgade 23 (House), 23 Hospital Street, Christiansted, St. Croix, VI

  7. 1. Photocopy of drawing (from U.S. Corps of Engineers, Treasury ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of drawing (from U.S. Corps of Engineers, Treasury Department, Washington, D.C., A.B. Young, Architect, 1856) Photographer unknown, Date unknown FRONTISPIECE FOR PLANS OF MARINE HOSPITAL - Marine Hospital, New Orleans, Orleans Parish, LA

  8. R2R--software to speed the depiction of aesthetic consensus RNA secondary structures.

    PubMed

    Weinberg, Zasha; Breaker, Ronald R

    2011-01-04

    With continuing identification of novel structured noncoding RNAs, there is an increasing need to create schematic diagrams showing the consensus features of these molecules. RNA structural diagrams are typically made either with general-purpose drawing programs like Adobe Illustrator, or with automated or interactive programs specific to RNA. Unfortunately, the use of applications like Illustrator is extremely time consuming, while existing RNA-specific programs produce figures that are useful, but usually not of the same aesthetic quality as those produced at great cost in Illustrator. Additionally, most existing RNA-specific applications are designed for drawing single RNA molecules, not consensus diagrams. We created R2R, a computer program that facilitates the generation of aesthetic and readable drawings of RNA consensus diagrams in a fraction of the time required with general-purpose drawing programs. Since the inference of a consensus RNA structure typically requires a multiple-sequence alignment, the R2R user annotates the alignment with commands directing the layout and annotation of the RNA. R2R creates SVG or PDF output that can be imported into Adobe Illustrator, Inkscape or CorelDRAW. R2R can be used to create consensus sequence and secondary structure models for novel RNA structures or to revise models when new representatives for known RNA classes become available. Although R2R does not currently have a graphical user interface, it has proven useful in our efforts to create 100 schematic models of distinct noncoding RNA classes. R2R makes it possible to obtain high-quality drawings of the consensus sequence and structural models of many diverse RNA structures with a more practical amount of effort. R2R software is available at http://breaker.research.yale.edu/R2R and as an Additional file.

  9. Photocopy of drawing. SPACECRAFT INDUSTRIAL AREA, O&C BUILDING, A&T AREA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing. SPACECRAFT INDUSTRIAL AREA, O&C BUILDING, A&T AREA, ALTITUDE CHAMBER “L”. NASA, John F. Kennedy Space Center, Florida. Drawing 79K00213, U.S. Army Corps of Engineers, no date. SHELL PENETRATION SCHEDULE. Sheet 4 - Cape Canaveral Air Force Station, Launch Complex 39, Altitude Chambers, First Street, between Avenue D and Avenue E, Cape Canaveral, Brevard County, FL

  10. 10. Photocopy of 1940 architectural drawing titled: 'Alterations & Additions ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of 1940 architectural drawing titled: 'Alterations & Additions to (4290) Hosital, Schedules' includes 'Typical Door Elevations' and 'Metal Door Frames.' Dated 4-12-40. HABS film is a high-contrast 8x10' negative made from original drawing in the collection of Housing and Engineering Services, Fort Lewis, WA. - Fort Lewis, Post Hospital, Near Ninth Division Drive & Idaho Avenue, DuPont, Pierce County, WA

  11. 33. AS BUILT DRAWING OF TAN 629 HANGAR SHOWING GENERAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. AS BUILT DRAWING OF TAN 629 HANGAR SHOWING GENERAL SITE PLAN AND RELATIONSHIP BETWEEN FLIGHT ENGINE TEST AREA TO ADMINISTRATION AND MAINTENANCE AREA, RAILROAD TRACKS AT SCALE OF 1 INCH TO 400 FEET. RALPH M. PARSONS DRAWING NUMBER: 1229-2 ANP/GE 5-101. DATED MARCH 15, 1957. - Idaho National Engineering Laboratory, Test Area North, Hangar No. 629, Scoville, Butte County, ID

  12. Toward Optimization of Gaze-Controlled Human-Computer Interaction: Application to Hindi Virtual Keyboard for Stroke Patients.

    PubMed

    Meena, Yogesh Kumar; Cecotti, Hubert; Wong-Lin, Kongfatt; Dutta, Ashish; Prasad, Girijesh

    2018-04-01

    Virtual keyboard applications and alternative communication devices provide new means of communication to assist disabled people. To date, virtual keyboard optimization schemes based on script-specific information, along with multimodal input access facility, are limited. In this paper, we propose a novel method for optimizing the position of the displayed items for gaze-controlled tree-based menu selection systems by considering a combination of letter frequency and command selection time. The optimized graphical user interface layout has been designed for a Hindi language virtual keyboard based on a menu wherein 10 commands provide access to type 88 different characters, along with additional text editing commands. The system can be controlled in two different modes: eye-tracking alone and eye-tracking with an access soft-switch. Five different keyboard layouts have been presented and evaluated with ten healthy participants. Furthermore, the two best performing keyboard layouts have been evaluated with eye-tracking alone on ten stroke patients. The overall performance analysis demonstrated significantly superior typing performance, high usability (87% SUS score), and low workload (NASA TLX with 17 scores) for the letter frequency and time-based organization with script specific arrangement design. This paper represents the first optimized gaze-controlled Hindi virtual keyboard, which can be extended to other languages.

  13. 18. Photocopy of scaled drawing (from the Engineering Office of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) originally drawn by Trone, November 9, 1933. Final revisions date December 10, 1957. Basement plan. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA

  14. Comparing two types of engineering visualizations: task-related manipulations matter.

    PubMed

    Cölln, Martin C; Kusch, Kerstin; Helmert, Jens R; Kohler, Petra; Velichkovsky, Boris M; Pannasch, Sebastian

    2012-01-01

    This study focuses on the comparison of traditional engineering drawings with a CAD (computer aided design) visualization in terms of user performance and eye movements in an applied context. Twenty-five students of mechanical engineering completed search tasks for measures in two distinct depictions of a car engine component (engineering drawing vs. CAD model). Besides spatial dimensionality, the display types most notably differed in terms of information layout, access and interaction options. The CAD visualization yielded better performance, if users directly manipulated the object, but was inferior, if employed in a conventional static manner, i.e. inspecting only predefined views. An additional eye movement analysis revealed longer fixation durations and a stronger increase of task-relevant fixations over time when interacting with the CAD visualization. This suggests a more focused extraction and filtering of information. We conclude that the three-dimensional CAD visualization can be advantageous if its ability to manipulate is used. Copyright © 2011 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  15. Defense Acquisition Research Journal. Volume 19, Number 3, Issue 63, July 2012

    DTIC Science & Technology

    2012-07-01

    submit your manuscript with references in APA format (author-date-page number form of citation) as outlined in the Publication Manual of the American...Psycho- logical Association ( 6th Edition ). For all other style questions, please refer to the Chicago Manual of Style (15th Edition ). Contributors are... Publications Assistants/ Graphic Designers Janet Amedome Lisa Drobek Multimedia Assistant Noelia Perez Editing , Design, and Layout Schatz Publishing Group The

  16. Hydrogen-Oxygen PEM Regenerative Fuel Cell Energy Storage System

    NASA Technical Reports Server (NTRS)

    Bents, David J.; Scullin, Vincent J.; Chang, Bei-Jiann; Johnson, Donald W.; Garcia, Christopher P.

    2005-01-01

    An introduction to the closed cycle hydrogen-oxygen polymer electrolyte membrane (PEM) regenerative fuel cell (RFC), recently constructed at NASA Glenn Research Center, is presented. Illustrated with explanatory graphics and figures, this report outlines the engineering motivations for the RFC as a solar energy storage device, the system requirements, layout and hardware detail of the RFC unit at NASA Glenn, the construction history, and test experience accumulated to date with this unit.

  17. Photograph of original drawing (original in possession of National Passenger ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: Foundation Plan / Alterations and Additions (dated: 7/17/14) - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA

  18. Photograph of original drawing (original in possession of National Passenger ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: First Floor Plan / Alterations and Additions (dated: 7/17/14) - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA

  19. Photograph of original drawing (original in possession of National Passenger ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: First Floor Plan / Alterations and Additions (dated: 5/1913) - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA

  20. 19. Photocopy of scaled drawing (from the Engineering Office of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) originally drawn by Trone, November 9, 1933. Final revisions date December 9, 1957. First floor plan. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA

  1. 20. Photocopy of scaled drawing (from the Engineering Office of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) originally drawn by Trone, November 9, 1933. Final revisions date December 6, 1957. Second floor plan. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA

  2. Fuels and Lubricants Influence on Turbine Engine Design and Performance

    DTIC Science & Technology

    1974-08-01

    Temperatures, Mission A. 30 16. Misrion A Interceptor ECS SchemaLiu. 32 17. GEl4/FLiTE-2A Fuel Delivery System Schematic. 34 18. GE14 /FLITE-2A Oil Sump...Layout Drawing. 36 19. G0E4/FL,I’LE-2A LubriaLiui SysLem Schematic. 37 20. GEl4/FLITE-2A Fluid Power System Schematic. 41 21. GE14 /FLITE-2A Fluid Syqtem...Schematic. 1 35 63. GEI4/FI,ITE-2B ThermaL Profiles, MIL-L-27502. 140 64. GE14 /FLIT.-2B Thermal Profiles, 500’ F E’ster. 141 .ix 7 LIST OF ILUWSTRAT LON

  3. 37. Photographic copy of architects plan, no date, (original in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of architects plan, no date, (original in possession of Montana State University, Bozeman, Montana.) PHOTOGRAPHIC COPY OF ORIGINAL DRAWING - Hardin City Water Works, 101 East Fourth Street, Hardin, Big Horn County, MT

  4. 20. Photograph of a line drawing in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photograph of a line drawing in the possession of the Engineer's Office of the Marion, IL Veterans Administration Medical Center. 3/4' SCALE DETAIL - MAIN ENT. UNIT (PLAN SECTIONS, HALF ELEVATION, SECTIONS THROUGH WINDOW & DOOR. HALF PLAN & HALF REFLECTED PLAN OF MARQUISE); DRAWING 1-13R, DATED SEPTEMBER 4, 1940. - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL

  5. The Family-centered Action Model of Intervention Layout and Implementation (FAMILI): the example of childhood obesity.

    PubMed

    Davison, Kirsten K; Lawson, Hal A; Coatsworth, J Douglas

    2012-07-01

    Parents play a fundamental role in shaping children's development, including their dietary and physical activity behaviors. Yet family-centered interventions are rarely used in obesity prevention research. Less than half of childhood obesity prevention programs include parents, and those that do include parents or a family component seldom focus on sustainable change at the level of the family. The general absence of a family-centered approach may be explained by persistent challenges in engaging parents and families and the absence of an intervention framework explicitly designed to foster family-centered programs. The Family-centered Action Model of Intervention Layout and Implementation, or FAMILI, was developed to address these needs. FAMILI draws on theories of family development to frame research and intervention design, uses a mixed-methods approach to conduct ecologically valid research, and positions family members as active participants in the development, implementation, and evaluation of family-centered obesity prevention programs. FAMILI is intended to facilitate the development of culturally responsive and sustainable prevention programs with the potential to improve outcomes. Although childhood obesity was used to illustrate the application of FAMILI, this model can be used to address a range of child health problems.

  6. 20. PECOS RIVER FLUME Photographic copy of construction drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. PECOS RIVER FLUME - Photographic copy of construction drawing dated February 1905 (from aperture card located at Bureau of Reclamation, Salt Lake City, Utah) EXTENSION OF CONCRETE AQUEDUCT - Carlsbad Irrigation District, Pecos River Flume, On Main Canal, .5 mile North of Carlsbad, Carlsbad, Eddy County, NM

  7. Photograph of original drawing (original in possession of National Passenger ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: Second Floor Plan (dated: 5/1/25, rev. 9/28/42) - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA

  8. 22. Photocopy of architectural drawing. (Original is in the collection ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photocopy of architectural drawing. (Original is in the collection of Richard F. McCann, Pasadena, CA.) Site Plan (Untitled). Dated May 3, 1934. Race Course for Mr. Joseph Gottstein, Washington Jockey Club. B. Marcus Priteca. - Longacres, 1621 Southwest Sixteenth Street, Renton, King County, WA

  9. 11. DETAIL VIEW OF WELDED DATES 1896/1941 (S.E. CORNER) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. DETAIL VIEW OF WELDED DATES - 1896/1941 (S.E. CORNER) 3 Photocopies of drawings labeled 'Bridge Rating Program by Boswell Engineering Company - Abbett Avenue Bridge, Spanning Whippany River at Abbett Avenue, Morristown, Morris County, NJ

  10. 36. Photographic copy of architects plan dated October 1919, (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. Photographic copy of architects plan dated October 1919, (original in possession of Montana State University, Bozeman, Montana.) DETAILED DRAWINGS OF FRONT ENTRANCE - Hardin City Water Works, 101 East Fourth Street, Hardin, Big Horn County, MT

  11. Improved process robustness by using closed loop control in deep drawing applications

    NASA Astrophysics Data System (ADS)

    Barthau, M.; Liewald, M.; Christian, Held

    2017-09-01

    The production of irregular shaped deep-drawing parts with high quality requirements, which are common in today’s automotive production, permanently challenges production processes. High requirements on lightweight construction of passenger car bodies following European regulations until 2020 have been massively increasing the use of high strength steels substantially for years and are also leading to bigger challenges in sheet metal part production. Of course, the more and more complex shapes of today’s car body shells also intensify the issue due to modern and future design criteria. The metal forming technology tries to meet these challenges by developing a highly sophisticated layout of deep drawing dies that consider part quality requirements, process robustness and controlled material flow during the deep or stretch drawing process phase. A new method for controlling material flow using a closed loop system was developed at the IFU Stuttgart. In contrast to previous approaches, this new method allows a control intervention during the deep-drawing stroke. The blank holder force around the outline of the drawn part is used as control variable. The closed loop is designed as trajectory follow up with feed forward control. The used command variable is the part-wall stress that is measured with a piezo-electric measuring pin. In this paper the used control loop will be described in detail. The experimental tool that was built for testing the new control approach is explained here with its features. A method for gaining the follow up trajectories from simulation will also be presented. Furthermore, experimental results considering the robustness of the deep drawing process and the gain in process performance with developed control loop will be shown. Finally, a new procedure for the industrial application of the new control method of deep drawing will be presented by using a new kind of active element to influence the local blank holder pressure onto part flange.

  12. 7. "LAUNCH SILOS; SECTIONS, DETAILS." Specifications No. ENG043535973; Drawing No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. "LAUNCH SILOS; SECTIONS, DETAILS." Specifications No. ENG-04-353-59-73; Drawing No. 5841-S-4; D.O. SERIES AW1525/26 Rev. A.; Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract No. 6601, Rev. A., Date 11 Sep 59. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Missile Silo Type, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA

  13. 6. "LAUNCH SILOS, PLAN AND DETAILS." Specifications No. OC15973; Drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. "LAUNCH SILOS, PLAN AND DETAILS." Specifications No. OC1-59-73; Drawing No. 5841 S-3; D.O. SERIES AW-1525/25 Rev. A.; Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract No. 6601, Rev. A., Date 11 Sep 59. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Missile Silo Type, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA

  14. 30. "CONSTRUCTION PHASING, STATION '50' AREA." Specifications No. ENG043535775, Drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. "CONSTRUCTION PHASING, STATION '50' AREA." Specifications No. ENG-04-353-57-75, Drawing No. AF-4502-19, sheet 4 of 5, D.O. Series No. AF 1439/26. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296, Date: 10 NOV. 59. - Edwards Air Force Base, South Base Sled Track, Edwards Air Force Base, North of Avenue B, between 100th & 140th Streets East, Lancaster, Los Angeles County, CA

  15. Joint DoD Standardization and Data/Configuration Management Conference (1991) Conducting Business Under the DMR

    DTIC Science & Technology

    1991-05-17

    items. These drawings represent the highest level of design disclo- sure. 4. APPROVAL DATE 5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTIC APPLICABLE...the contract or purchase order. Product drawings and associated lists shall provide the design disclosure information necessary to enable a...performance characteristics duplicate those of the original design . These drawings shall: a. Reflect the end-product at its current level of design

  16. Parametric Accuracy: Building Information Modeling Process Applied to the Cultural Heritage Preservation

    NASA Astrophysics Data System (ADS)

    Garagnani, S.; Manferdini, A. M.

    2013-02-01

    Since their introduction, modeling tools aimed to architectural design evolved in today's "digital multi-purpose drawing boards" based on enhanced parametric elements able to originate whole buildings within virtual environments. Semantic splitting and elements topology are features that allow objects to be "intelligent" (i.e. self-aware of what kind of element they are and with whom they can interact), representing this way basics of Building Information Modeling (BIM), a coordinated, consistent and always up to date workflow improved in order to reach higher quality, reliability and cost reductions all over the design process. Even if BIM was originally intended for new architectures, its attitude to store semantic inter-related information can be successfully applied to existing buildings as well, especially if they deserve particular care such as Cultural Heritage sites. BIM engines can easily manage simple parametric geometries, collapsing them to standard primitives connected through hierarchical relationships: however, when components are generated by existing morphologies, for example acquiring point clouds by digital photogrammetry or laser scanning equipment, complex abstractions have to be introduced while remodeling elements by hand, since automatic feature extraction in available software is still not effective. In order to introduce a methodology destined to process point cloud data in a BIM environment with high accuracy, this paper describes some experiences on monumental sites documentation, generated through a plug-in written for Autodesk Revit and codenamed GreenSpider after its capability to layout points in space as if they were nodes of an ideal cobweb.

  17. 17. Photocopy of drawing, Erection Plan of Top Lateral Bracing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of drawing, Erection Plan of Top Lateral Bracing of Bridge at South Norwalk for the N.Y., N.H. and H.R.R., dated June 12, 1895. Original on file with Metro North Commuter Railroad. - South Norwalk Railroad Bridge, South Main & Washington Streets, Norwalk, Fairfield County, CT

  18. Photograph of original drawing (original in possession of National Passenger ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: Basement Floor Plan / Alterations and Additions (dated 5/1913). Proposed plan - not used - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA

  19. Photograph of original drawing (original in possession of National Passenger ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: Ground Floor Plan / Alterations and Additions (dated: 7/17/14, rev. 10/21/14) - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA

  20. 22. Photocopy of architectural drawing. (Original is in the collection ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photocopy of architectural drawing. (Original is in the collection of Richard F. McCann, Pasadena, CA.) Grandstand Balcony Plan. Dated June 30, 1933. Race Course for Mr. Joseph Gottstein, Washington Jockey Club. B. Marcus Priteca. - Longacres, Original Grandstand, 1621 Southwest Sixteenth Street, Renton, King County, WA

  1. 75 FR 55475 - Drawbridge Operation Regulation; Pequonnock River, Bridgeport, CT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ... two bridges because the draw spans of the bridges have been removed. DATES: This rule is effective... removing the operation regulations for two moveable draw bridges that no longer have moveable spans. Under... litigation, eliminate ambiguity, and reduce burden. Protection of Children We have analyzed this rule under...

  2. 17. Photocopy of drawing (original 8 x 101/2 inch plate ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of drawing (original 8 x 10-1/2 inch plate located in: USDA Forest Service, North Pacific Region, recreation handbook, date unknown). COMMUNITY BLDG., PLATE A-9 (enlarged from a 4x5 negative) - Austin Pass Warming Hut, Washington Highway 542, Glacier, Whatcom County, WA

  3. Design and Simulation Plant Layout Using Systematic Layout Planning

    NASA Astrophysics Data System (ADS)

    Suhardini, D.; Septiani, W.; Fauziah, S.

    2017-12-01

    This research aims to design the factory layout of PT. Gunaprima Budiwijaya in order to increase production capacity. The problem faced by this company is inappropriate layout causes cross traffic on the production floor. The re-layout procedure consist of these three steps: analysing the existing layout, designing plant layout based on SLP and evaluation and selection of alternative layout using Simulation Pro model version 6. Systematic layout planning is used to re-layout not based on the initial layout. This SLP produces four layout alternatives, and each alternative will be evaluated based on two criteria, namely cost of material handling using Material Handling Evaluation Sheet (MHES) and processing time by simulation. The results showed that production capacity is increasing as much as 37.5% with the addition of the machine and the operator, while material handling cost was reduced by improvement of the layout. The use of systematic layout planning method reduces material handling cost of 10,98% from initial layout or amounting to Rp1.229.813,34.

  4. 19. Stress sheet for the river span dated 7/13/12; revised ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Stress sheet for the river span dated 7/13/12; revised Oct. 18 and 21, 1912. Drawing courtesy Office of the Cuyahoga County Engineer, Cleveland, Ohio. - Detroit Superior High Level Bridge, Cleveland, Cuyahoga County, OH

  5. 28. "CONSTRUCTION PHASING, STATION '0' AREA." Specifications No. OC15775, Drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. "CONSTRUCTION PHASING, STATION '0' AREA." Specifications No. OC1-57-75, Drawing No. AF-45-02-19, sheet 3 of 5, D.O. Series No. AF 1439/25, Rev. B. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296 Rev. B, Date: 11/13/59. - Edwards Air Force Base, South Base Sled Track, Edwards Air Force Base, North of Avenue B, between 100th & 140th Streets East, Lancaster, Los Angeles County, CA

  6. CellNetVis: a web tool for visualization of biological networks using force-directed layout constrained by cellular components.

    PubMed

    Heberle, Henry; Carazzolle, Marcelo Falsarella; Telles, Guilherme P; Meirelles, Gabriela Vaz; Minghim, Rosane

    2017-09-13

    The advent of "omics" science has brought new perspectives in contemporary biology through the high-throughput analyses of molecular interactions, providing new clues in protein/gene function and in the organization of biological pathways. Biomolecular interaction networks, or graphs, are simple abstract representations where the components of a cell (e.g. proteins, metabolites etc.) are represented by nodes and their interactions are represented by edges. An appropriate visualization of data is crucial for understanding such networks, since pathways are related to functions that occur in specific regions of the cell. The force-directed layout is an important and widely used technique to draw networks according to their topologies. Placing the networks into cellular compartments helps to quickly identify where network elements are located and, more specifically, concentrated. Currently, only a few tools provide the capability of visually organizing networks by cellular compartments. Most of them cannot handle large and dense networks. Even for small networks with hundreds of nodes the available tools are not able to reposition the network while the user is interacting, limiting the visual exploration capability. Here we propose CellNetVis, a web tool to easily display biological networks in a cell diagram employing a constrained force-directed layout algorithm. The tool is freely available and open-source. It was originally designed for networks generated by the Integrated Interactome System and can be used with networks from others databases, like InnateDB. CellNetVis has demonstrated to be applicable for dynamic investigation of complex networks over a consistent representation of a cell on the Web, with capabilities not matched elsewhere.

  7. 31. Photographic copy of historic drawing, December 1900 tracing of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photographic copy of historic drawing, December 1900 tracing of survey dated 8 July 1799 of Fort Nelson for Co. Tho. Newton, surveyed by Jesse Nicholson C.E. (Portsmouth Naval Shipyard Museum, Portsmouth, VA) - Portsmouth Naval Hospital, Bounded by Elizabeth River, Crawford Street, Portsmouth General Hospital, Parkview Avenue, & Scotts Creek, Portsmouth, Portsmouth, VA

  8. 5. Photocopy of site plan drawing, with later amendments dhowing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopy of site plan drawing, with later amendments dhowing original USFS building shceduled for removal, Annex moved to present location, and addition to Warehouse (from the U.S. Forest Service, Wenatchee National Forest) Date Unkown - U.S. Forest Service Chelan Ranger Station, 428 West Woodin Avenue, Chelan, Chelan County, WA

  9. DRAWING R100131, COMPANY OFFICERS' AREA, BUILDING LOCATIONS, DRIVEWAYS, AND SIDEWALKS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DRAWING R-1001-31, COMPANY OFFICERS' AREA, BUILDING LOCATIONS, DRIVEWAYS, AND SIDEWALKS, LAS LOMAS AND BUENA VISTA DRIVES. Ink on linen, signed by H.B. Nurse. Date has been erased, but probably June 15, 1933. Also marked "PWC 104288." - Hamilton Field, East of Nave Drive, Novato, Marin County, CA

  10. DRAWING R100132, FIELD OFFICERS' AREA, BUILDING LOCATIONS, DRIVEWAYS, AND SIDEWALKS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DRAWING R-1001-32, FIELD OFFICERS' AREA, BUILDING LOCATIONS, DRIVEWAYS, AND SIDEWALKS, SOUTH CIRCLE, CASA GRANDE REAL, AND SEQUOIA DRIVES. Ink on linen, signed by H.B. Nurse. Date has been erased, but probably June 15, 1933. Also marked "PWC 104289." - Hamilton Field, East of Nave Drive, Novato, Marin County, CA

  11. 14. Photographic copy of original Survey Data drawing of the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photographic copy of original Survey Data drawing of the Loleta Dams, date and engineer unknown (original in possession of United States Department of Agriculture-Forest Service-Allegheny National Forest). - Loleta Recreation Area, Lower Dam, 6 miles Southeast of interesection of State Route 24041 & State Route 66, Loleta, Elk County, PA

  12. 168. ARAIV Index of drawings prepared by Norman Engineering Company ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    168. ARA-IV Index of drawings prepared by Norman Engineering Company in preparation for construction of ARA-IV. Norman Engineering Company 961-area/ML-1index. Date: March 1961. Ineel index code no. 066-9999-90-613-102731. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  13. 20. Photocopy of drawing, Stringers for Bridge at So. Norwalk ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of drawing, Stringers for Bridge at So. Norwalk for the N.Y., N.H. and H.R.R., Contract No. 3000, Berlin Iron Bridge Company, dated July 8, 1895. Original on file with Metro North Commuter Railroad. - South Norwalk Railroad Bridge, South Main & Washington Streets, Norwalk, Fairfield County, CT

  14. 21. Photocopy of drawing, Plan of Abutments for Bridge No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photocopy of drawing, Plan of Abutments for Bridge No. 79B at Main & Washington Sts., South Norwalk, N.Y. Div., N.Y., N.H. and H.R.R., dated November 22, 1895. Original on file with Metro North Commuter Railroad. - South Norwalk Railroad Bridge, South Main & Washington Streets, Norwalk, Fairfield County, CT

  15. 16. Photocopy of drawing, floor system plan, Bridge No. 79B, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photocopy of drawing, floor system plan, Bridge No. 79B, Main & Washington Sts., So. Norwalk, Ct., N. Y. Division, N.Y., N.H. and H.R.R., dated April 23, 1895. Original on file with Metro North Commuter Railroad. - South Norwalk Railroad Bridge, South Main & Washington Streets, Norwalk, Fairfield County, CT

  16. Fluid design studies of integrated modular engine system

    NASA Technical Reports Server (NTRS)

    Frankenfield, Bruce; Carek, Jerry

    1993-01-01

    A study was performed to develop a fluid system design and show the feasibility of constructing an integrated modular engine (IME) configuration, using an expander cycle engine. The primary design goal of the IME configuration was to improve the propulsion system reliability. The IME fluid system was designed as a single fault tolerant system, while minimizing the required fluid components. This study addresses the design of the high pressure manifolds, turbopumps and thrust chambers for the IME configuration. A physical layout drawing was made, which located each of the fluid system components, manifolds and thrust chambers. Finally, a comparison was made between the fluid system designs of an IME system and a non-network (clustered) engine system.

  17. Experiment definition phase shuttle laboratory. LDRL-10.6 experiment

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The work completed on the experiment definition phase of the shuttle laboratory LDRL 10.6 micrometers experiment from 27 September 1975 to 26 January 1976 was reported. This work included progress in the following areas: (1) optomechanical system: completion of detail drawings, completion of the beryllium subassembly, fabrication, checking, and weighing of approximately 95% of the detailed parts, dry film lubrication of the bearings and gears, and initiation of assembly of the gimbals; (2) optics: update of the detailed optical layout, receipt of nine mirrors and the pre-expander; (3) miscellaneous: delivery of draft material for the final report, completion of optical testing of the 10.6 micrometers receiver, and receipt, assembly, and checkout of NASA test console.

  18. Ultramicrowave communications system, phase 2

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Communications system design was completed and reviewed. Minor changes were made in order to make it more cost effective and to increase design flexibility. System design activities identified the techniques and procedures to generate and monitor high data rate test signals. Differential bi-phase demodulation is the proposed method for this system. The mockup and packaging designs were performed, and component layout and interconnection constraints were determined, as well as design drawings for dummy parts of the system. The possibility of adding a low cost option to the transceiver system was studied. The communications program has the advantage that new technology signal processing devices can be readily interfaced with the existing radio frequency subsystem to produce a short range radar.

  19. Facility Layout Problems Using Bays: A Survey

    NASA Astrophysics Data System (ADS)

    Davoudpour, Hamid; Jaafari, Amir Ardestani; Farahani, Leila Najafabadi

    2010-06-01

    Layout design is one of the most important activities done by industrial Engineers. Most of these problems have NP hard Complexity. In a basic layout design, each cell is represented by a rectilinear, but not necessarily convex polygon. The set of fully packed adjacent polygons is known as a block layout (Asef-Vaziri and Laporte 2007). Block layout is divided by slicing tree and bay layout. In bay layout, departments are located in vertical columns or horizontal rows, bays. Bay layout is used in real worlds especially in concepts such as semiconductor and aisles. There are several reviews in facility layout; however none of them focus on bay layout. The literature analysis given here is not limited to specific considerations about bay layout design. We present a state of art review for bay layout considering some issues such as the used objectives, the techniques of solving and the integration methods in bay.

  20. 27. "SITE PLAN." Specifications No. OC15775, Drawing No. AF600915, sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. "SITE PLAN." Specifications No. OC1-57-75, Drawing No. AF-60-09-15, sheet 1 of 96, D.O. Series No. AF 1394/20, Rev. B. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296 Rev. B, Date: 11/17/59. Site plan of 20,000-foot track, including construction phasing notes. - Edwards Air Force Base, South Base Sled Track, Edwards Air Force Base, North of Avenue B, between 100th & 140th Streets East, Lancaster, Los Angeles County, CA

Top