Sample records for licensed operating reactors

  1. 10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... notification requirements for operating nuclear power reactors. (a) General requirements. 1 (1) Each nuclear power reactor licensee licensed under §§ 50.21(b) or 50.22 holding an operating license under this part...

  2. 10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... notification requirements for operating nuclear power reactors. (a) General requirements. 1 (1) Each nuclear power reactor licensee licensed under §§ 50.21(b) or 50.22 holding an operating license under this part...

  3. 77 FR 26321 - Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... Nuclear Reactor, Renewed Facility Operating License No. R-112 AGENCY: Nuclear Regulatory Commission... Commission (NRC or the Commission) has issued renewed Facility Operating License No. R- 112, held by Reed... License No. R-112 will expire 20 years from its date of issuance. The renewed facility operating license...

  4. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple... construct and operate nuclear power reactors of identical design (“common design”) to be located at multiple...

  5. 10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... notification requirements for operating nuclear power reactors. (a) General requirements. 1 (1) Each nuclear... requirements for immediate notification of the NRC by licensed operating nuclear power reactors are contained...

  6. 78 FR 73898 - Operator Licensing Examination Standards for Power Reactors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-09

    ... Reactors AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment. SUMMARY: The U.S..., Revision 10, ``Operator Licensing Examination Standards for Power Reactors.'' DATES: Submit comments [email protected] . Both of the Office of New Reactors; or Timothy Kolb, Office of Nuclear Reactor Regulation, U...

  7. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  8. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  9. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  10. 10 CFR 72.210 - General license issued.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.210 General license issued. A general license is... reactor sites to persons authorized to possess or operate nuclear power reactors under 10 CFR part 50 or...

  11. 10 CFR 72.210 - General license issued.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.210 General license issued. A general license is... reactor sites to persons authorized to possess or operate nuclear power reactors under 10 CFR part 50 or...

  12. 10 CFR 50.30 - Filing of application; oath or affirmation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...

  13. 10 CFR 50.30 - Filing of application; oath or affirmation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...

  14. 10 CFR 50.30 - Filing of application; oath or affirmation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...

  15. 10 CFR 50.30 - Filing of application; oath or affirmation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...

  16. 77 FR 7613 - Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-264; NRC-2012-0026] Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108 AGENCY: Nuclear Regulatory Commission... Facility Operating License No. R-108 (``Application''), which currently authorizes the Dow Chemical Company...

  17. 75 FR 12311 - FirstEnergy Nuclear Operating Company; Notice of Consideration of Issuance of Amendment to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... INFORMATION CONTACT: Michael Mahoney, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission... Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR... NUCLEAR REGULATORY COMMISSION [Docket No. 50-346] FirstEnergy Nuclear Operating Company; Notice of...

  18. 10 CFR 2.1115 - Designation of issues for adjudicatory hearing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... at Civilian Nuclear Power Reactors § 2.1115 Designation of issues for adjudicatory hearing. (a) After... reactor already licensed to operate at the site, or any civilian nuclear power reactor for which a... the issuance of a construction permit or operating license for a civilian nuclear power reactor at...

  19. 78 FR 26811 - Dow Chemical Company, Dow TRIGA Research Reactor; License Renewal for the Dow Chemical TRIGA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... Research Reactor; License Renewal for the Dow Chemical TRIGA Research Reactor; Supplemental Information and... 20, 2012 (77 FR 42771), ``License Renewal for the Dow Chemical TRIGA Research Reactor,'' to inform... Chemical Company which would authorize continued operation of the Dow TRIGA Research Reactor. The notice...

  20. 78 FR 5840 - Notice of License Termination for University of Illinois Advanced TRIGA Reactor, License No. R-115

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...

  1. Function of university reactors in operator licensing training for nuclear utilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wicks, F.

    1985-11-01

    The director of the Division of the US Nuclear Regulatory Commission in generic letter 84-10, dated April 26, 1984, spoke the requirement that applicants for senior reactor operator licenses for power reactors shall have performed then reactor startups. Simulator startups were not acknowledged. Startups performed on a university reactor are acceptable. The content and results of a five-day program combining instruction and experiments with the Rensselaer reactor are summarized.

  2. 10 CFR 140.94 - Appendix D-Form of indemnity agreement with Federal agencies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (hereinafter referred to as the Act). Article I As used in this agreement, 1. Nuclear reactor, byproduct... irradiated or to be irradiated by, the nuclear reactor or reactors subject to the license or licenses... construction of a nuclear reactor with respect to which no operating license has been issued by the Nuclear...

  3. 75 FR 36126 - Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.1, Revision 1 on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0228] Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.1, Revision 1 on Physical Security--Combined License and Operating...), Section 13.6.1 on ``Physical Security--Combined License and Operating Reactors,'' (Agencywide Documents...

  4. 76 FR 16842 - Request for a License To Export Reactor Components

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... NUCLEAR REGULATORY COMMISSION Request for a License To Export Reactor Components Pursuant to 10.... Mechanical Corporation. coolant pump 1000 (design) maintenance, and systems, related reactors. operation of AP- equipment, and 1000 (design) spare parts. nuclear reactors. February 10, 2011 February 23, 2011...

  5. 78 FR 57904 - Request for a License To Export; Reactor Components

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... NUCLEAR REGULATORY COMMISSION Request for a License To Export; Reactor Components Pursuant to 10..., systems, related reactors. operation of AP- XR177, 11006121. equipment, and 1000 (design) spare parts. nuclear reactors. Dated this 16th day of September 2013 in Rockville, Maryland. For The Nuclear Regulatory...

  6. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operating licenses for nuclear power reactors, if the Commission has not found that a hearing is in the public interest, the Commission, the Director, Office of New Reactors or Director, Office of Nuclear... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  7. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  8. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  9. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operating licenses for nuclear power reactors, if the Commission has not found that a hearing is in the public interest, the Commission, the Director, Office of New Reactors or Director, Office of Nuclear... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  10. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  11. 10 CFR Appendix A to Part 110 - Illustrative List of Nuclear Reactor Equipment Under NRC Export Licensing Authority

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Illustrative List of Nuclear Reactor Equipment Under NRC... List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note: A nuclear reactor... core of a nuclear reactor and capable of withstanding the operating pressure of the primary coolant. (2...

  12. 10 CFR 171.3 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... holding an operating license for a power reactor, test reactor or research reactor issued under part 50 of... authorizes operation of a power reactor. The regulations in this part also apply to any person holding a...

  13. 10 CFR Appendix A to Part 110 - Illustrative List of Nuclear Reactor Equipment Under NRC Export Licensing Authority

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Illustrative List of Nuclear Reactor Equipment Under NRC... List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note—A nuclear reactor basically... nuclear reactor and capable of withstanding the operating pressure of the primary coolant. (2) On-line (e...

  14. 10 CFR Appendix A to Part 110 - Illustrative List of Nuclear Reactor Equipment Under NRC Export Licensing Authority

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Illustrative List of Nuclear Reactor Equipment Under NRC... List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note—A nuclear reactor basically... nuclear reactor and capable of withstanding the operating pressure of the primary coolant. (2) On-line (e...

  15. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required for issuance of a construction permit, operating license, combined license, in any hearing under... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases for not incorporating severe accident mitigation design alternatives into the design of the reactor to...

  16. 78 FR 35990 - All Operating Boiling-Water Reactor Licensees With Mark I And Mark II Containments; Docket Nos...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0128] All Operating Boiling-Water Reactor Licensees With Mark I And Mark II Containments; Docket Nos. (As Shown In Attachment 1), License Nos. (As Shown In Attachment 1), EA-13-109; Order Modifying Licenses With Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident...

  17. 78 FR 71675 - Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... correspondence to addressees and subscribers through a computer-based email distribution system. Since then, the... Electronic Operating Reactor Correspondence The U.S. Nuclear Regulatory Commission (NRC) is issuing this... available operating reactor licensing correspondence, effective December 9, 2013. Official agency records...

  18. 10 CFR 140.72 - Indemnity agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (issued pursuant to part 50 of this chapter) authorizing the licensee to operate the nuclear reactor... the licensee to possess and store special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of an operating license for the reactor...

  19. 10 CFR 140.72 - Indemnity agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (issued pursuant to part 50 of this chapter) authorizing the licensee to operate the nuclear reactor... the licensee to possess and store special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of an operating license for the reactor...

  20. 78 FR 46255 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ... environmental effect of renewing the operating license of a nuclear power plant. This document is necessary to..., Environmental impact statement, Nuclear materials, Nuclear power plants and reactors, Reporting and... Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction AGENCY: Nuclear...

  1. 77 FR 40092 - License Amendment To Increase the Maximum Reactor Power Level, Florida Power & Light Company, St...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Increase the Maximum Reactor Power Level, Florida Power & Light Company, St. Lucie, Units 1 and 2 AGENCY... amendment for Renewed Facility Operating License Nos. DPR-67 and NPF-16, issued to Florida Power & Light... St. Lucie County, Florida. The proposed license amendment would increase the maximum thermal power...

  2. Operators in the Plum Brook Reactor Facility Control Room

    NASA Image and Video Library

    1970-03-21

    Donald Rhodes, left, and Clyde Greer, right, monitor the operation of the National Aeronautics and Space Administration’s (NASA) Plum Brook Reactor Facility from the control room. The 60-megawatt test reactor, NASA’s only reactor, was the eighth largest test reactor in the world. The facility was built by the Lewis Research Center in the late 1950s to study the effects of radiation on different materials that could be used to construct nuclear propulsion systems for aircraft or rockets. The reactor went critical for the first time in 1961. For the next two years, two operators were on duty 24 hours per day working on the fission process until the reactor reached its full-power level in 1963. Reactor Operators were responsible for monitoring and controlling the reactor systems. Once the reactor was running under normal operating conditions, the work was relatively uneventful. Normally the reactor was kept at a designated power level within certain limits. Occasionally the operators had to increase the power for a certain test. The shift supervisor and several different people would get together and discuss the change before boosting the power. All operators were required to maintain a Reactor Operator License from the Atomic Energy Commission. The license included six months of training, an eight-hour written exam, a four-hour walkaround, and testing on the reactor controls.

  3. 10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Immediate notification requirements for operating nuclear power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... notification requirements for operating nuclear power reactors. (a) General requirements. 1 (1) Each nuclear...

  4. 10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Immediate notification requirements for operating nuclear power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... notification requirements for operating nuclear power reactors. (a) General requirements. 1 (1) Each nuclear...

  5. 10 CFR 140.11 - Amounts of financial protection for certain reactors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...,000,000 for each nuclear reactor he is authorized to operate at a thermal power level not exceeding ten kilowatts; (2) In the amount of $1,500,000 for each nuclear reactor he is authorized to operate at... amount of $2,500,000 for each nuclear reactor other than a testing reactor or a reactor licensed under...

  6. 10 CFR 140.11 - Amounts of financial protection for certain reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...,000,000 for each nuclear reactor he is authorized to operate at a thermal power level not exceeding ten kilowatts; (2) In the amount of $1,500,000 for each nuclear reactor he is authorized to operate at... amount of $2,500,000 for each nuclear reactor other than a testing reactor or a reactor licensed under...

  7. 10 CFR 140.11 - Amounts of financial protection for certain reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...,000,000 for each nuclear reactor he is authorized to operate at a thermal power level not exceeding ten kilowatts; (2) In the amount of $1,500,000 for each nuclear reactor he is authorized to operate at... amount of $2,500,000 for each nuclear reactor other than a testing reactor or a reactor licensed under...

  8. 10 CFR 2.103 - Action on applications for byproduct, source, special nuclear material, facility and operator...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... nuclear material, facility and operator licenses. (a) If the Director, Office of Nuclear Reactor... repository operations area under parts 60 or 63 of this chapter, the Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, Director, Office of Nuclear Material Safety and Safeguards, or...

  9. 10 CFR 2.103 - Action on applications for byproduct, source, special nuclear material, facility and operator...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... nuclear material, facility and operator licenses. (a) If the Director, Office of Nuclear Reactor... repository operations area under parts 60 or 63 of this chapter, the Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, Director, Office of Nuclear Material Safety and Safeguards, or...

  10. 77 FR 69663 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... required or asked to report: Holders of and applicants for facility (i.e., nuclear power, non-power research and test reactor) operating licenses and individual operators; licenses. 5. The number of annual...

  11. 78 FR 9745 - Kewaunee Power Station; Application for Amendment to Facility Operating License

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... FURTHER INFORMATION CONTACT: Karl Feintuch, Project Manager, Office of Nuclear Reactor Regulation, U.S... Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2013-03037 Filed 2-8-13; 8:45 am] BILLING CODE... NUCLEAR REGULATORY COMMISSION [Docket No. 50-305; NRC-2013-0028] Kewaunee Power Station...

  12. 75 FR 61220 - Massachusetts Institute of Technology: Massachusetts Institute of Technology Research Reactor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ... renewed Facility Operating License No. R-37, to be held by the Massachusetts Institute of Technology (MIT... Identification of the Proposed Action The proposed action would renew Facility Operating License No. R-37 for a... License No. R-37 to allow continued operation of the MITR for a period of twenty years at an increased...

  13. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  14. Nuclear Security: Action May Be Needed to Reassess the Security of NRC-Licensed Research Reactors. Report to the Ranking Member, Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives. GAO-08-403

    ERIC Educational Resources Information Center

    Aloise, Gene

    2008-01-01

    There are 37 research reactors in the United States, mostly located on college campuses. Of these, 33 reactors are licensed and regulated by the Nuclear Regulatory Commission (NRC). Four are operated by the Department of Energy (DOE) and are located at three national laboratories. Although less powerful than commercial nuclear power reactors,…

  15. 10 CFR 52.167 - Issuance of manufacturing license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... proposed reactor(s) can be incorporated into a nuclear power plant and operated at sites having... design and manufacture the proposed nuclear power reactor(s); (5) The proposed inspections, tests... the construction of a nuclear power facility using the manufactured reactor(s). (2) A holder of a...

  16. 76 FR 62095 - Exelon Generation Company, LLC; Notice of Withdrawal of Application for Amendment to Facility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-373 and 50-374; NRC-2011-0234] Exelon Generation.... Nuclear Regulatory Commission (NRC, the Commission) has granted the request of Exelon Generation Company...

  17. Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    The US Nuclear Regulatory Commission`s monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided.

  18. 10 CFR 140.52 - Indemnity agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) authorizing the licensee to operate the nuclear reactor involved; or (2) The effective date of the license... material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after... 10 Energy 2 2014-01-01 2014-01-01 false Indemnity agreements. 140.52 Section 140.52 Energy NUCLEAR...

  19. 10 CFR 140.52 - Indemnity agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) authorizing the licensee to operate the nuclear reactor involved; or (2) The effective date of the license... material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after... 10 Energy 2 2010-01-01 2010-01-01 false Indemnity agreements. 140.52 Section 140.52 Energy NUCLEAR...

  20. 77 FR 39521 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... Methodology for Boiling Water Reactors, June 2011. To support use of Topical Report ANP-10307PA, Revision 0... the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will... Water Reactors with AREVA Topical Report ANP- 10307PA, Revision 0, ``AREVA MCPR Safety Limit Methodology...

  1. A Potential NASA Research Reactor to Support NTR Development

    NASA Technical Reports Server (NTRS)

    Eades, Michael; Gerrish, Harold; Hardin, Leroy

    2013-01-01

    In support of efforts for research into the design and development of a man rated Nuclear Thermal Rocket (NTR) engine, the National Aeronautics and Space Administration (NASA), Marshall Space Flight Center (MSFC), is evaluating the potential for building a Nuclear Regulatory Commission (NRC) licensed research reactor. The proposed reactor would be licensed by NASA and operated jointly by NASA and university partners. The purpose of this reactor would be to perform further research into the technologies and systems needed for a successful NTR project and promote nuclear training and education.

  2. 77 FR 63897 - Notice of License Terminations for National Aeronautics and Space Administration; Plum Brook...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... test reactor, constructed to perform irradiation testing of fueled and unfueled experiments for space... constructed to test ``mock-up'' irradiation components for the Plum Brook Reactor. The reactors operated from...

  3. 75 FR 68629 - Massachusetts Institute of Technology Reactor Notice of Issuance of Renewed Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-08

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-020; NRC-2010-0313] Massachusetts Institute of Technology Reactor Notice of Issuance of Renewed Facility Operating; License No. R-37 The U.S. Nuclear... Institute of Technology (the licensee), which authorizes continued operation of the Massachusetts Institute...

  4. 10 CFR 100.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.3 Definitions. As used in this part: Combined license... power facilities. Exclusion area means that area surrounding the reactor, in which the reactor licensee.... Activities unrelated to operation of the reactor may be permitted in an exclusion area under appropriate...

  5. 10 CFR 100.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.3 Definitions. As used in this part: Combined license... power facilities. Exclusion area means that area surrounding the reactor, in which the reactor licensee.... Activities unrelated to operation of the reactor may be permitted in an exclusion area under appropriate...

  6. 76 FR 69296 - University of Utah, University of Utah TRIGA Nuclear Reactor, Notice of Issuance of Renewed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-407, NRC-2011-0153] University of Utah, University of Utah TRIGA Nuclear Reactor, Notice of Issuance of Renewed Facility Operating License No. R-126 AGENCY... University of Utah (UU, the licensee), which authorizes continued operation of the UU TRIGA Nuclear Reactor...

  7. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... nonpower reactors. 73.60 Section 73.60 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION... requirements for physical protection at nonpower reactors. Each nonpower reactor licensee who, pursuant to the... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec...

  8. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... nonpower reactors. 73.60 Section 73.60 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION... requirements for physical protection at nonpower reactors. Each nonpower reactor licensee who, pursuant to the... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec...

  9. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...

  10. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...

  11. Chapter 5, "License Renewal and Aging Management for Continued Service

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naus, Dan J

    As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of themore » license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.« less

  12. 10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license...

  13. 10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license...

  14. 10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license...

  15. 10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license...

  16. 10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license...

  17. 78 FR 29393 - University of Missouri-Columbia Facility Operating License No. R-103

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... Curators of the University of Missouri--Columbia (the licensee) to operate the Missouri University Research Reactor (MURR) at a maximum steady-state thermal power of 10 megawatts (MW). The renewed license would authorize the licensee to operate the MURR up to a steady-state thermal power of 10 MW for an additional 20...

  18. 76 FR 23848 - Carolina Power And Light Company; Notice of Withdrawal of Application for Amendment to Renewed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ...; Notice of Withdrawal of Application for Amendment to Renewed Facility Operating License The U.S. Nuclear... December 9, 2010, for a proposed amendment to Renewed Facility Operating License No. NPF-63 for the Shearon... Pressurized Water Reactors,'' to the Core Operating Limits Report methodologies list. This change would have...

  19. 10 CFR 51.53 - Postconstruction environmental reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... renewal of a license to operate a nuclear power plant under part 54 of this chapter shall submit with its... for a nuclear power reactor shall submit this report only in connection with the first licensing action authorizing full-power operation. In this report, the applicant shall discuss the same matters...

  20. Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne L.

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However,more » it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.« less

  1. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne Leland

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However,more » it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.« less

  2. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  3. 77 FR 3009 - Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Advanced Boiling Water Reactors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0010] Knowledge and Abilities Catalog for Nuclear Power... comment a draft NUREG, NUREG-2104, Revision 0, ``Knowledge and Abilities Catalog for Nuclear Power Plant... developed using this Catalog along with the Operator Licensing Examination Standards for Power Reactors...

  4. Knowledge and abilities catalog for nuclear power plant operators: Boiling water reactors, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWRs) (NUREG-1123, Revision 1) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog along with the Operator Licensing Examiner Standards (NUREG-1021) and the Examiner`s Handbook for Developing Operator Licensing Written Examinations (NUREG/BR-0122), will cover the topics listed under Title 10, Code of Federal Regulations, Part 55 (10 CFR 55). The BWR Catalog contains approximately 7,000 knowledge and ability (K/A) statements for ROs and SROs at BWRs. The catalog is organized intomore » six major sections: Organization of the Catalog, Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Functions, Emergency and Abnormal Plant Evolutions, Components, and Theory. Revision 1 to the BWR Catalog represents a modification in form and content of the original catalog. The K/As were linked to their applicable 10 CFR 55 item numbers. SRO level K/As were identified by 10 CFR 55.43 item numbers. The plant-wide generic and system generic K/As were combined in one section with approximately one hundred new K/As. Component Cooling Water and Instrument Air Systems were added to the Systems Section. Finally, High Containment Hydrogen Concentration and Plant Fire On Site evolutions added to the Emergency and Abnormal Plant Evolutions section.« less

  5. Expanded scope of training and education programs at the UFTR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vernetson, W.G.; Whaley, P.M.

    1985-01-01

    Historically, the University of Florida Training Reactor (UFTR) has been used to train both hot and cold license reactor operator candidates in intensive two- and three-week training programs consisting of a correlated set of classroom lectures, hands-on reactor operations, and laboratory exercises. These training programs provide nuclear plant operating staff with fundamental operational experience in understanding, controlling, and evaluating subcritical multiplication, reactivity effects, reactivity manipulations, and reactor operations; a sufficient number of startups and shutdowns is also assured. The UDTR is also used in a nuclear engineering course entitled ''Principles of Nuclear Reactor Operations.'' The purpose of this paper ismore » to report the results of efforts to redirect and refine tractor operations educational and training programs at the UFTR.« less

  6. 10 CFR 51.23 - Temporary storage of spent fuel after cessation of reactor operation-generic determination of no...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Temporary storage of spent fuel after cessation of reactor operation-generic determination of no significant environmental impact. 51.23 Section 51.23 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED...

  7. 78 FR 37591 - Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point Unit 2, LLC, Issuance of Director...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0284; Docket No. 50-247; License No. DPR-26] Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point Unit 2, LLC, Issuance of Director's Decision Notice is hereby given that the Deputy Director, Reactor Safety Programs, Office of Nuclear Reactor...

  8. 77 FR 30435 - In-core Thermocouples at Different Elevations and Radial Positions in Reactor Core

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... NUCLEAR REGULATORY COMMISSION 10 CFR Part 50 [Docket No. PRM-50-105; NRC-2012-0056] In-core Thermocouples at Different Elevations and Radial Positions in Reactor Core AGENCY: Nuclear Regulatory Commission... of operating licenses for nuclear power plants (``NPP'') to operate NPPs with in-core thermocouples...

  9. 75 FR 27368 - Aerotest Operations, Inc., Aerotest Radiography and Research Reactor; Notice of Consideration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ...., Aerotest Radiography and Research Reactor; Notice of Consideration of Approval of Transfer and Conforming Amendment, Opportunity for a Hearing, and Order Imposing Procedures for Access to Sensitive Unclassified Non... Manager, Research and Test Reactors Licensing Branch, Division of Policy and Rulemaking, Office of Nuclear...

  10. 77 FR 14445 - Application for a License To Export Steel Forging

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...) 415-1677, to request a digital ID certificate and allow for the creation of an electronic docket. In...Energy Nuclear Operating Co Reactor vessel One The reactor vessel Spain. December 15, 2011 head steel...

  11. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...

  12. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...

  13. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...

  14. 10 CFR 171.15 - Annual fees: Reactor licenses and independent spent fuel storage licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Annual fees: Reactor licenses and independent spent fuel... REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS LICENSES, INCLUDING HOLDERS OF CERTIFICATES OF... NRC § 171.15 Annual fees: Reactor licenses and independent spent fuel storage licenses. (a) Each...

  15. 10 CFR 171.15 - Annual fees: Reactor licenses and independent spent fuel storage licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Annual fees: Reactor licenses and independent spent fuel... REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS LICENSES, INCLUDING HOLDERS OF CERTIFICATES OF... NRC § 171.15 Annual fees: Reactor licenses and independent spent fuel storage licenses. (a) Each...

  16. 77 FR 73684 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... interval extension is bounded by the 15 year ILRT Interval currently authorized within NEI [Nuclear Energy... following benefits: (1) Allows the plant to reach the all-rods-in condition prior to significant reactor...

  17. Operating experience feedback report: New plants, Commercial power reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dennig, R.L.; O'Reilly, P.D.

    1987-07-01

    This report documents a detailed review of the cause of unplanned events during the early months of licensed operation for plants licensed between March 1983 and April 1986. The major lessons and corrective actions that appear to have the greatest potential for improving the effectiveness of plant startups are provided for consideration through the operating experience feedback programs and activities of the industry and the NRC staff.

  18. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  19. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  20. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  1. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  2. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  3. 77 FR 42771 - License Renewal for the Dow Chemical TRIGA Research Reactor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Chemical Company in Midland, MI and is a part of the Analytical Sciences Laboratory. The reactor is housed...-Radiological Impacts The Dow TRIGA Research Reactor core is cooled by a light water primary system consisting... provided by the volume of primary coolant allows several hours of full-power operation without any...

  4. 75 FR 42469 - Firstenergy Nuclear Operating Company; Request for Licensing Action

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-21

    ... nuclear plant in Ohio, preventing the reactor from restarting until such time that the NRC determines... Commission's regulations. The request has been referred to the Director of the Office of Nuclear Reactor... of Nuclear Reactor Regulation. [FR Doc. 2010-17834 Filed 7-20-10; 8:45 am] BILLING CODE 7590-01-P ...

  5. 76 FR 11521 - Prairie Island Nuclear Generating Plant, Unit 1, Northern States Power Company-Minnesota; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ..., Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001..., Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2011-4557 Filed 3-1... NUCLEAR REGULATORY COMMISSION [Docket No. 50-282; NRC-2011-0040] Prairie Island Nuclear Generating...

  6. 10 CFR 50.69 - Risk-informed categorization and treatment of structures, systems and components for nuclear...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., systems and components for nuclear power reactors. 50.69 Section 50.69 Energy NUCLEAR REGULATORY..., systems and components for nuclear power reactors. (a) Definitions. Risk-Informed Safety Class (RISC)-1... holder of a license to operate a light water reactor (LWR) nuclear power plant under this part; a holder...

  7. 10 CFR 50.69 - Risk-informed categorization and treatment of structures, systems and components for nuclear...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., systems and components for nuclear power reactors. 50.69 Section 50.69 Energy NUCLEAR REGULATORY..., systems and components for nuclear power reactors. (a) Definitions. Risk-Informed Safety Class (RISC)-1... holder of a license to operate a light water reactor (LWR) nuclear power plant under this part; a holder...

  8. 10 CFR 50.69 - Risk-informed categorization and treatment of structures, systems and components for nuclear...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., systems and components for nuclear power reactors. 50.69 Section 50.69 Energy NUCLEAR REGULATORY..., systems and components for nuclear power reactors. (a) Definitions. Risk-Informed Safety Class (RISC)-1... holder of a license to operate a light water reactor (LWR) nuclear power plant under this part; a holder...

  9. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant... that the applicant wishes to have the application considered under 10 CFR part 52, appendix N, and must...

  10. 10 CFR 50.57 - Issuance of operating license. 1

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...

  11. 10 CFR 50.57 - Issuance of operating license. 1

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...

  12. 10 CFR 50.57 - Issuance of operating license. 1

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...

  13. 10 CFR 50.57 - Issuance of operating license. 1

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...

  14. 10 CFR 50.57 - Issuance of operating license. 1

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...

  15. Licensed operating reactors: Status summary report data as of December 31, 1991. Volume 16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-03-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1991) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1more » capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.« less

  16. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1more » capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.« less

  17. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne; Honma, George

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less

  18. 10 CFR 2.401 - Notice of hearing on construction permit or combined license applications pursuant to appendix N...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pursuant to appendix N of part 50 of this chapter for construction permits for nuclear power reactors of... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... license applications pursuant to appendix N of 10 CFR parts 50 or 52. 2.401 Section 2.401 Energy NUCLEAR...

  19. 77 FR 63343 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... PWR [Pressurized-Water Reactor] Steam Generator Tubes'' (Reference 32) and [Nuclear Energy Institute... maintains the required structural margins of the SG tubes for both normal and accident conditions. Nuclear Energy Institute 97-06, ``Steam Generator Program Guidelines'' (Reference 8), and NRC Regulatory Guide 1...

  20. 77 FR 75451 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-20

    ... upgraded licenses or license renewals to operate the controls at a nuclear reactor facility. This... NUCLEAR REGULATORY COMMISSION [Docket No. NRC-2012-0184] Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request AGENCY: Nuclear Regulatory...

  1. 76 FR 73727 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... Detection Instrumentation,'' to define a new time limit for restoring inoperable RCS leakage detection... Specifications Section 3.4.15 regarding reactor coolant leakage detection instrumentation to be consistent with... amendments revised the Technical Specifications (TSs) ``RCS [reactor coolant system] Leakage Detection...

  2. 76 FR 66090 - Facility Operating License Amendment From Virginia Electric and Power Company, Surry Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... operating pressures, leakage from primary water stress corrosion cracking below the proposed limited... discussed in Regulatory Guide (RG) 1.121, ``Bases for Plugging Degraded PWR [Pressurized-Water Reactor...

  3. NRC Licensing Status Summary Report for NGNP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne Leland; Kinsey, James Carl

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction andmore » operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.« less

  4. ReactorHealth Physics operations at the NIST center for neutron research.

    PubMed

    Johnston, Thomas P

    2015-02-01

    Performing health physics and radiation safety functions under a special nuclear material license and a research and test reactor license at a major government research and development laboratory encompasses many elements not encountered by industrial, general, or broad scope licenses. This article reviews elements of the health physics and radiation safety program at the NIST Center for Neutron Research, including the early history and discovery of the neutron, applications of neutron research, reactor overview, safety and security of radiation sources and radioactive material, and general health physics procedures. These comprise precautions and control of tritium, training program, neutron beam sample processing, laboratory audits, inventory and leak tests, meter calibration, repair and evaluation, radioactive waste management, and emergency response. In addition, the radiation monitoring systems will be reviewed including confinement building monitoring, ventilation filter radiation monitors, secondary coolant monitors, gaseous fission product monitors, gas monitors, ventilation tritium monitor, and the plant effluent monitor systems.

  5. A Research Reactor Concept to Support NTP Development

    NASA Technical Reports Server (NTRS)

    Eades, Michael J.; Blue, T. E.; Gerrish, Harold P.; Hardin, Leroy A.

    2014-01-01

    In support of efforts for research into the design and development of man rated Nuclear Thermal Propulsion (NTP), the National Aeronautics and Space Administration (NASA), Marshall Space Flight Center (MSFC), is evaluating the potential for building a Nuclear Regulatory Commission (NRC) licensed NTP based research reactor (NTPRR). The proposed NTPRR would be licensed by NASA and operated jointly by NASA and university partners. The purpose of the NTPRR would be used to perform further research into the technologies and systems needed for a successful NTP project and promote nuclear training and education.

  6. 10 CFR 50.82 - Termination of license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to the NRC, consistent with the requirements of § 50.4(b)(8); (ii) Once fuel has been permanently... fuel from the reactor vessel, or when a final legally effective order to permanently cease operations... emplacement or retention of fuel into the reactor vessel. (3) Decommissioning will be completed within 60...

  7. 76 FR 30204 - Exelon Nuclear, Dresden Nuclear Power Station, Unit 1; Exemption From Certain Security Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... Power Station, Unit 1; Exemption From Certain Security Requirements 1.0 Background Exelon Nuclear is the licensee and holder of Facility Operating License No. DPR-2 issued for Dresden Nuclear Power Station (DNPS... protection of licensed activities in nuclear power reactors against radiological sabotage,'' paragraph (b)(1...

  8. 77 FR 47123 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ...-Water Reactors] Steam Generator Tubes'' [Reference 7] and NEI [Nuclear Energy Institute] 97-06, ``Steam... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these... the required structural margins of the SG tubes for both normal and accident conditions. Nuclear...

  9. 78 FR 2295 - Charlissa C. Smith; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-10

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 55-23694-SP; ASLBP No. 13-925-01-SP-BD01] Charlissa C... (Board) is being established to preside over the following proceeding: Charlissa C. Smith, (Denial of Senior Reactor Operator License). This proceeding concerns a hearing request from Charlissa C. Smith...

  10. 10 CFR 55.40 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.40... Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written... also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared...

  11. 10 CFR 55.40 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.40... Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written... also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared...

  12. 10 CFR 55.40 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.40... Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written... also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared...

  13. 10 CFR 55.40 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.40... Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written... also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared...

  14. 10 CFR 55.40 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.40... Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written... also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared...

  15. Code qualification of structural materials for AFCI advanced recycling reactors.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Natesan, K.; Li, M.; Majumdar, S.

    2012-05-31

    This report summarizes the further findings from the assessments of current status and future needs in code qualification and licensing of reference structural materials and new advanced alloys for advanced recycling reactors (ARRs) in support of Advanced Fuel Cycle Initiative (AFCI). The work is a combined effort between Argonne National Laboratory (ANL) and Oak Ridge National Laboratory (ORNL) with ANL as the technical lead, as part of Advanced Structural Materials Program for AFCI Reactor Campaign. The report is the second deliverable in FY08 (M505011401) under the work package 'Advanced Materials Code Qualification'. The overall objective of the Advanced Materials Codemore » Qualification project is to evaluate key requirements for the ASME Code qualification and the Nuclear Regulatory Commission (NRC) approval of structural materials in support of the design and licensing of the ARR. Advanced materials are a critical element in the development of sodium reactor technologies. Enhanced materials performance not only improves safety margins and provides design flexibility, but also is essential for the economics of future advanced sodium reactors. Code qualification and licensing of advanced materials are prominent needs for developing and implementing advanced sodium reactor technologies. Nuclear structural component design in the U.S. must comply with the ASME Boiler and Pressure Vessel Code Section III (Rules for Construction of Nuclear Facility Components) and the NRC grants the operational license. As the ARR will operate at higher temperatures than the current light water reactors (LWRs), the design of elevated-temperature components must comply with ASME Subsection NH (Class 1 Components in Elevated Temperature Service). However, the NRC has not approved the use of Subsection NH for reactor components, and this puts additional burdens on materials qualification of the ARR. In the past licensing review for the Clinch River Breeder Reactor Project (CRBRP) and the Power Reactor Innovative Small Module (PRISM), the NRC/Advisory Committee on Reactor Safeguards (ACRS) raised numerous safety-related issues regarding elevated-temperature structural integrity criteria. Most of these issues remained unresolved today. These critical licensing reviews provide a basis for the evaluation of underlying technical issues for future advanced sodium-cooled reactors. Major materials performance issues and high temperature design methodology issues pertinent to the ARR are addressed in the report. The report is organized as follows: the ARR reference design concepts proposed by the Argonne National Laboratory and four industrial consortia were reviewed first, followed by a summary of the major code qualification and licensing issues for the ARR structural materials. The available database is presented for the ASME Code-qualified structural alloys (e.g. 304, 316 stainless steels, 2.25Cr-1Mo, and mod.9Cr-1Mo), including physical properties, tensile properties, impact properties and fracture toughness, creep, fatigue, creep-fatigue interaction, microstructural stability during long-term thermal aging, material degradation in sodium environments and effects of neutron irradiation for both base metals and weld metals. An assessment of modified versions of Type 316 SS, i.e. Type 316LN and its Japanese version, 316FR, was conducted to provide a perspective for codification of 316LN or 316FR in Subsection NH. Current status and data availability of four new advanced alloys, i.e. NF616, NF616+TMT, NF709, and HT-UPS, are also addressed to identify the R&D needs for their code qualification for ARR applications. For both conventional and new alloys, issues related to high temperature design methodology are described to address the needs for improvements for the ARR design and licensing. Assessments have shown that there are significant data gaps for the full qualification and licensing of the ARR structural materials. Development and evaluation of structural materials require a variety of experimental facilities that have been seriously degraded in the past. The availability and additional needs for the key experimental facilities are summarized at the end of the report. Detailed information covered in each Chapter is given.« less

  16. Development of New Transportation/Storage Cask System for Use by DOE Russian Research Reactor Fuel Return Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael Tyacke; Frantisek Svitak; Jiri Rychecky

    2010-04-01

    The United States, the Russian Federation, and the International Atomic Energy Agency (IAEA) have been working together on a program called the Russian Research Reactor Fuel Return (RRRFR) Program. The purpose of this program is to return Soviet or Russian supplied high-enriched uranium (HEU) fuel currently stored at Russian-designed research reactors throughout the world to Russia. To accommodate transport of the HEU spent nuclear fuel (SNF), a new large-capacity transport/storage cask system was specially designed for handling and operations under the unique conditions for these research reactor facilities. This new cask system is named the ŠKODA VPVR/M cask. The design,more » licensing, testing, and delivery of this new cask system are the results of a significant international cooperative effort by several countries and involved numerous private and governmental organizations. This paper contains the following sections: (1) Introduction/Background; (2) VPVR/M Cask Description; (3) Ancillary Equipment, (4) Cask Licensing; (5) Cask Demonstration and Operations; (6) IAEA Procurement, Quality Assurance Inspections, Fabrication, and Delivery; and, (7) Summary and Conclusions.« less

  17. Development of a New Transportation/Storage Cask System for Use by the DOE Russian Research Reactor Fuel Return Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael J. Tyacke; Frantisek Svitak; Jiri Rychecky

    2007-10-01

    The United States, the Russian Federation, and the International Atomic Energy Agency (IAEA) have been working together on a program called the Russian Research Reactor Fuel Return (RRRFR) Program. The purpose of this program is to return Soviet or Russian-supplied high-enriched uranium (HEU) fuel, currently stored at Russian-designed research reactors throughout the world, to Russia. To accommodate transport of the HEU spent nuclear fuel (SNF), a new large-capacity transport/storage cask system was specially designed for handling and operations under the unique conditions at these research reactor facilities. This new cask system is named the ŠKODA VPVR/M cask. The design, licensing,more » testing, and delivery of this new cask system result from a significant international cooperative effort by several countries and involved numerous private and governmental organizations. This paper contains the following sections: 1) Introduction; 2) VPVR/M Cask Description; 3) Ancillary Equipment, 4) Cask Licensing; 5) Cask Demonstration and Operations; 6) IAEA Procurement, Quality Assurance Inspections, Fabrication, and Delivery; and, 7) Conclusions.« less

  18. 10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  19. 78 FR 15747 - Charlissa C. Smith (Denial of Senior Reactor Operator License)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 55-23694-SP; ASLBP No. 13-925-01-SP-BD01] Charlissa C... Reconstitution Pursuant to 10 CFR 2.313(c) and 2.321(b), the Atomic Safety and Licensing Board (Board) in the above-captioned Charlissa C. Smith case is hereby reconstituted because Administrative Judge Alan S...

  20. 76 FR 21917 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... SGTR accident. At normal operating pressures, leakage from primary water stress corrosion cracking... PWR [pressurized- water reactor] Operability Requirements and Actions for RCS Leakage Instrumentation... water inventory can be obtained. Therefore, it is concluded that the proposed changes do not involve a...

  1. 10 CFR 140.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... an application has been filed for a license authorizing operation at: (1) A thermal power level in excess of 10 megawatts; or (2) A thermal power level in excess of 1 megawatt, if the reactor is to... plant means a plant in which the following operations or activities are conducted: (1) Operations for...

  2. 10 CFR 140.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... an application has been filed for a license authorizing operation at: (1) A thermal power level in excess of 10 megawatts; or (2) A thermal power level in excess of 1 megawatt, if the reactor is to... plant means a plant in which the following operations or activities are conducted: (1) Operations for...

  3. 76 FR 388 - Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... Design,'' GDC 31, ``Fracture Prevention of Reactor Coolant Pressure Boundary,'' and GDC 32, ``Inspection... Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration...

  4. Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

  5. 77 FR 60039 - Non-Power Reactor License Renewal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    ... NUCLEAR REGULATORY COMMISSION 10 CFR Part 50 [NRC-2011-0087] RIN 3150-AI96 Non-Power Reactor... the final regulatory basis for rulemaking to streamline non-power reactor license renewal. This final... Reactor (RTR) License Renewal Process. This contemplated rulemaking also recommends conforming changes to...

  6. 75 FR 57535 - Northern States Power Company-Minnesota Notice of Issuance of Amendments to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... issuance. FOR FURTHER INFORMATION CONTACT: Thomas J. Wengert, Office of Nuclear Reactor Regulation, U.S... Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2010-23516 Filed 9-20-10; 8:45 am] BILLING CODE... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-282 and 50-306; NRC-2010-0290] Northern States Power...

  7. 76 FR 6638 - Virginia Electric and Power Company D/B/A/ Dominion Virginia Power and Old Dominion Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... Company D/B/A/ Dominion Virginia Power and Old Dominion Electric Cooperative, North Anna Power Station... combined license (COL) application to build and operate a new reactor at its North Anna Power Station (NAPS... Combined License (COL) for North Anna Power Station, Unit 3.'' A notice of availability of the final...

  8. 76 FR 80409 - Draft Supplement 2 to Final Environmental Statement Related to the Operation of Watts Bar Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... image files of the NRC's public documents. If you do not have access to ADAMS or if there are problems.... Stephen J. Campbell, Chief, Watts Bar Special Projects Branch, Division of Operating Reactor Licensing...

  9. Regulatory Risk Reduction for Advanced Reactor Technologies – FY2016 Status and Work Plan Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne Leland

    2016-08-01

    Millions of public and private sector dollars have been invested over recent decades to realize greater efficiency, reliability, and the inherent and passive safety offered by advanced nuclear reactor technologies. However, a major challenge in experiencing those benefits resides in the existing U.S. regulatory framework. This framework governs all commercial nuclear plant construction, operations, and safety issues and is highly large light water reactor (LWR) technology centric. The framework must be modernized to effectively deal with non-LWR advanced designs if those designs are to become part of the U.S energy supply. The U.S. Department of Energy’s (DOE) Advanced Reactor Technologiesmore » (ART) Regulatory Risk Reduction (RRR) initiative, managed by the Regulatory Affairs Department at the Idaho National Laboratory (INL), is establishing a capability that can systematically retire extraneous licensing risks associated with regulatory framework incompatibilities. This capability proposes to rely heavily on the perspectives of the affected regulated community (i.e., commercial advanced reactor designers/vendors and prospective owner/operators) yet remain tuned to assuring public safety and acceptability by regulators responsible for license issuance. The extent to which broad industry perspectives are being incorporated into the proposed framework makes this initiative unique and of potential benefit to all future domestic non-LWR applicants« less

  10. 76 FR 63668 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-13

    ... Licensing of Non-Power Reactors: Format and Content,'' for the Production of Radioisotopes and NUREG-1537, part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors... production facility and the Research and Test Reactor Licensing Branch (PRLB) of the Division of Policy and...

  11. 10 CFR 110.26 - General license for the export of nuclear reactor components.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false General license for the export of nuclear reactor components. 110.26 Section 110.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Licenses § 110.26 General license for the export of nuclear reactor...

  12. 10 CFR 110.26 - General license for the export of nuclear reactor components.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false General license for the export of nuclear reactor components. 110.26 Section 110.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Licenses § 110.26 General license for the export of nuclear reactor...

  13. 10 CFR 110.26 - General license for the export of nuclear reactor components.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false General license for the export of nuclear reactor components. 110.26 Section 110.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Licenses § 110.26 General license for the export of nuclear reactor...

  14. 10 CFR 110.26 - General license for the export of nuclear reactor components.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false General license for the export of nuclear reactor components. 110.26 Section 110.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Licenses § 110.26 General license for the export of nuclear reactor...

  15. 10 CFR 110.26 - General license for the export of nuclear reactor components.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false General license for the export of nuclear reactor components. 110.26 Section 110.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Licenses § 110.26 General license for the export of nuclear reactor...

  16. 77 FR 1514 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... Technical Specification (TS) 3.4.5, ``RCS Leakage Detection Instrumentation,'' consistent with the NRC... monitoring system are the only operable reactor coolant leakage detection monitoring systems. The modified... Coolant System] Leakage Instrumentation,'' Revision 3. The availability of this TS improvement was...

  17. Plum Brook Reactor Facility Control Room during Facility Startup

    NASA Image and Video Library

    1961-02-21

    Operators test the National Aeronautics and Space Administration’s (NASA) Plum Brook Reactor Facility systems in the months leading up to its actual operation. The “Reactor On” signs are illuminated but the reactor core was not yet ready for chain reactions. Just a couple weeks after this photograph, Plum Brook Station held a media open house to unveil the 60-megawatt test reactor near Sandusky, Ohio. More than 60 members of the print media and radio and television news services met at the site to talk with community leaders and representatives from NASA and Atomic Energy Commission. The Plum Brook reactor went critical for the first time on the evening of June 14, 1961. It was not until April 1963 that the reactor reached its full potential of 60 megawatts. The reactor control room, located on the second floor of the facility, was run by licensed operators. The operators manually operated the shim rods which adjusted the chain reaction in the reactor core. The regulating rods could partially or completely shut down the reactor. The control room also housed remote area monitoring panels and other monitoring equipment that allowed operators to monitor radiation sensors located throughout the facility and to scram the reactor instantly if necessary. The color of the indicator lights corresponded with the elevation of the detectors in the various buildings. The reactor could also shut itself down automatically if the monitors detected any sudden irregularities.

  18. Oak Ridge National Laboratory Support of Non-light Water Reactor Technologies: Capabilities Assessment for NRC Near-term Implementation Action Plans for Non-light Water Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Belles, Randy; Jain, Prashant K.; Powers, Jeffrey J.

    The Oak Ridge National Laboratory (ORNL) has a rich history of support for light water reactor (LWR) and non-LWR technologies. The ORNL history involves operation of 13 reactors at ORNL including the graphite reactor dating back to World War II, two aqueous homogeneous reactors, two molten salt reactors (MSRs), a fast-burst health physics reactor, and seven LWRs. Operation of the High Flux Isotope Reactor (HFIR) has been ongoing since 1965. Expertise exists amongst the ORNL staff to provide non-LWR training; support evaluation of non-LWR licensing and safety issues; perform modeling and simulation using advanced computational tools; run laboratory experiments usingmore » equipment such as the liquid salt component test facility; and perform in-depth fuel performance and thermal-hydraulic technology reviews using a vast suite of computer codes and tools. Summaries of this expertise are included in this paper.« less

  19. 10 CFR 51.107 - Public hearings in proceedings for issuance of combined licenses; limited work authorizations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the issuance of a combined license for a nuclear power reactor under part 52 of this chapter, the... or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) If a combined license... authorization should be issued as proposed by the Director of New Reactors or the Director of Nuclear Reactor...

  20. 10 CFR 51.107 - Public hearings in proceedings for issuance of combined licenses; limited work authorizations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the issuance of a combined license for a nuclear power reactor under part 52 of this chapter, the... or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) If a combined license... authorization should be issued as proposed by the Director of New Reactors or the Director of Nuclear Reactor...

  1. 10 CFR 51.107 - Public hearings in proceedings for issuance of combined licenses; limited work authorizations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the issuance of a combined license for a nuclear power reactor under part 52 of this chapter, the... or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) If a combined license... authorization should be issued as proposed by the Director of New Reactors or the Director of Nuclear Reactor...

  2. 10 CFR 51.107 - Public hearings in proceedings for issuance of combined licenses; limited work authorizations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the issuance of a combined license for a nuclear power reactor under part 52 of this chapter, the... or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) If a combined license... authorization should be issued as proposed by the Director of New Reactors or the Director of Nuclear Reactor...

  3. 10 CFR 51.107 - Public hearings in proceedings for issuance of combined licenses; limited work authorizations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the issuance of a combined license for a nuclear power reactor under part 52 of this chapter, the... or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) If a combined license... authorization should be issued as proposed by the Director of New Reactors or the Director of Nuclear Reactor...

  4. 76 FR 40937 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... Generator Water Level High-High'' instrument setpoint and associated allowable value. The proposed change is... [Pressurized-Water Reactor] PWR Operability Requirements and Actions for RCS Leakage Instrumentation''. Basis... monitor is the containment atmospheric gaseous radiation monitor. The monitoring of RCS leakage is not a...

  5. 76 FR 1644 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... tubesheet in that region. At normal operating pressures, leakage from primary water stress corrosion... cause failure. The EDG reliability will thereby be potentially increased by reducing the stresses on the..., ``Bases for Plugging Degraded PWR [pressurized-water reactor] Steam Generator Tubes,'' margins against...

  6. 76 FR 37845 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection... RCS leakage detection instrumentation. These changes are consistent with NRC-approved Revision 3 to...? Response: No. The proposed change clarifies the operability requirements for the RCS leakage detection...

  7. 10 CFR 2.400 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to construct and/or operate nuclear power reactors of identical design to be located at multiple... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart. 2.400 Section 2.400 Energy NUCLEAR...

  8. 10 CFR Appendix I to Part 50 - Numerical Guides for Design Objectives and Limiting Conditions for Operation To Meet the...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... in Light-Water-Cooled Nuclear Power Reactor Effluents I Appendix I to Part 50 Energy NUCLEAR... Criterion “As Low as is Reasonably Achievable” for Radioactive Material in Light-Water-Cooled Nuclear Power... light-water-cooled nuclear power reactors licensed under 10 CFR part 50 or part 52 of this chapter. The...

  9. 10 CFR Appendix I to Part 50 - Numerical Guides for Design Objectives and Limiting Conditions for Operation To Meet the...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... in Light-Water-Cooled Nuclear Power Reactor Effluents I Appendix I to Part 50 Energy NUCLEAR... Criterion “As Low as is Reasonably Achievable” for Radioactive Material in Light-Water-Cooled Nuclear Power... light-water-cooled nuclear power reactors licensed under 10 CFR part 50 or part 52 of this chapter. The...

  10. 10 CFR Appendix I to Part 50 - Numerical Guides for Design Objectives and Limiting Conditions for Operation To Meet the...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... in Light-Water-Cooled Nuclear Power Reactor Effluents I Appendix I to Part 50 Energy NUCLEAR... Criterion “As Low as is Reasonably Achievable” for Radioactive Material in Light-Water-Cooled Nuclear Power... light-water-cooled nuclear power reactors licensed under 10 CFR part 50 or part 52 of this chapter. The...

  11. 10 CFR 72.6 - License required; types of licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General... the receipt, handling, storage, and transfer of reactor-related GTCC are specific licenses. Any... hereby issued to receive title to and own spent fuel, high-level radioactive waste, or reactor-related...

  12. 10 CFR 72.6 - License required; types of licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General... the receipt, handling, storage, and transfer of reactor-related GTCC are specific licenses. Any... hereby issued to receive title to and own spent fuel, high-level radioactive waste, or reactor-related...

  13. 76 FR 52699 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the... New analysis limit 10 CFR 50.67 limit EAB 4.56 rem TEDE Main steam line isolation. Closing the pressurizer power-operated relief valves block valves. Securing all reactor coolant pumps. Feedwater isolation...

  14. BWR Anticipated Transients Without Scram Leading to Instability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cheng L. Y.; Baek J.; Cuadra, A.

    2013-11-10

    Anticipated transients without scram (ATWS) in aboiling water reactor (BWR) were simulated in order to understand reactor response and determine the effectiveness of automatic and operator actions to mitigate this beyond-design-basis accident. The events of interest herein are initiated by a turbine trip when the reactor is operating in the expanded operating domainMELLLA+ [maximum extended load line limit plus]. In these events the reactor may initially be at up to 120% of the original licensed thermal power (OLTP) and at flow rates as low as 80% of rated.For these (and similar) ATWS events the concern isthat when the reactor powermore » decreases in response to a dual recirculation pump trip, the core will become unstable and large amplitude oscillations will begin. The occurrence of these power oscillations, if left unmitigated, may result in fuel damage, and the amplitude of the poweroscillations may hamper the effectiveness of the injection of dissolved neutron absorber through the standby liquid control system (SLCS).« less

  15. 10 CFR 72.218 - Termination of licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.218 Termination of licenses. (a) The notification regarding the program for the management of spent fuel at the reactor required by § 50.54(bb) of...

  16. 10 CFR 72.218 - Termination of licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.218 Termination of licenses. (a) The notification regarding the program for the management of spent fuel at the reactor required by § 50.54(bb) of...

  17. 75 FR 67399 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... Filled,'' and TS 3.9.5, ``Decay Heat Removal (DHR) and Coolant Circulation--Low Water Level,'' to permit...-approved Dominion Fleet Report DOM-NAF-2- A, ``Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer...

  18. 77 FR 38742 - Non-Power Reactor License Renewal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ...-0087] RIN 3150-AI96 Non-Power Reactor License Renewal AGENCY: Nuclear Regulatory Commission. ACTION... reactors. This contemplated rulemaking would also make conforming changes to address technical issues in existing non-power reactor regulations. The NRC is seeking input from the public, licensees, certificate...

  19. 76 FR 68514 - Request for a License To Export Reactor Components

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... NUCLEAR REGULATORY COMMISSION Request for a License To Export Reactor Components Pursuant to 10.../docket Number Westinghouse Electric Company Complete reactor 12 Perform seismic China. LLC, August 18... qualification equipment. of AP1000 (design) nuclear reactors. For the Nuclear Regulatory Commission. Dated this...

  20. 10 CFR 50.36 - Technical specifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... nuclear reactors are limits upon important process variables that are found to be necessary to reasonably... Commission terminates the license for the reactor, except for nuclear power reactors licensed under § 50.21(b... for nuclear reactors are settings for automatic protective devices related to those variables having...

  1. 10 CFR 50.36 - Technical specifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... nuclear reactors are limits upon important process variables that are found to be necessary to reasonably... Commission terminates the license for the reactor, except for nuclear power reactors licensed under § 50.21(b... for nuclear reactors are settings for automatic protective devices related to those variables having...

  2. 10 CFR 50.36 - Technical specifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... nuclear reactors are limits upon important process variables that are found to be necessary to reasonably... Commission terminates the license for the reactor, except for nuclear power reactors licensed under § 50.21(b... for nuclear reactors are settings for automatic protective devices related to those variables having...

  3. 10 CFR Appendix A to Part 110 - Illustrative List of Nuclear Reactor Equipment Under NRC Export Licensing Authority

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Illustrative List of Nuclear Reactor Equipment Under NRC... List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note—A nuclear reactor basically includes the items within or attached directly to the reactor vessel, the equipment which controls the...

  4. 10 CFR Appendix A to Part 110 - Illustrative List of Nuclear Reactor Equipment Under NRC Export Licensing Authority

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Illustrative List of Nuclear Reactor Equipment Under NRC... List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note—A nuclear reactor basically includes the items within or attached directly to the reactor vessel, the equipment which controls the...

  5. 75 FR 22868 - Withdrawal of Regulatory Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Characterization of Seismic Sources and Determination of Safe Shutdown Earthquake Ground Motion.'' FOR FURTHER.... Nuclear Regulatory Commission (NRC) is withdrawing RG 1.165, ``Identification and Characterization of... alter the licensing basis of any currently operating reactor or any of the currently issued early site...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Melber, B.D.; Saari, L.M.; White, A.S.

    This report assesses the job-relatedness of specialized educational programs for licensed nuclear reactor operators. The approach used involved systematically comparing the curriculum of specialized educational programs for college credit, to academic knowledge identified as necessary for carrying out the jobs of licenses reactor operators. A sample of eight programs, including A.S. degree, B.S. degree, and coursework programs were studied. Subject matter experts in the field of nuclear operations curriculum and training determined the extent to which individual program curricula covered the identified job-related academic knowledge. The major conclusions of the report are: There is a great deal of variation amongmore » individual programs, ranging from coverage of 15% to 65% of the job-related academic knowledge. Four schools cover at least half, and four schools cover less than one-third of this knowledge content; There is no systematic difference in the job-relatedness of the different types of specialized educational programs, A.S. degree, B.S. degree, and coursework; and Traditional B.S. degree programs in nuclear engineering cover as much job-related knowledge (about one-half of this knowledge content) as most of the specialized educational programs.« less

  7. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a singlemore » operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.« less

  8. 75 FR 70042 - In the Matter of All Power Reactor Licensees and Research Reactor Licensees Who Transport Spent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos (Redacted), License Nos (Redacted), EA (Redacted); NRC- 2010-0351] In the Matter of All Power Reactor Licensees and Research Reactor Licensees Who Transport Spent Nuclear Fuel; Order Modifying License (Effective Immediately) I. The licensees identified in...

  9. 75 FR 79423 - In the Matter of All Power Reactor Licensees and Research Reactor Licensees Who Transport Spent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. (Redacted), License Nos.: (Redacted), EA (Redacted); NRC- 2010-0351] In the Matter of All Power Reactor Licensees and Research Reactor Licensees Who Transport Spent Nuclear Fuel; Order Modifying License (Effective Immediately) I The licensees identified in...

  10. 10 CFR 2.501 - Notice of hearing on application under subpart F of 10 CFR part 52 for a license to manufacture...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... part 52 for a license to manufacture nuclear power reactors. 2.501 Section 2.501 Energy NUCLEAR... Procedures Applicable to Proceedings for the Issuance of Licenses To Manufacture Nuclear Power Reactors To Be... power reactors. (a) In the case of an application under subpart F of part 52 of this chapter for a...

  11. 10 CFR 2.501 - Notice of hearing on application under subpart F of 10 CFR part 52 for a license to manufacture...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... part 52 for a license to manufacture nuclear power reactors. 2.501 Section 2.501 Energy NUCLEAR... Procedures Applicable to Proceedings for the Issuance of Licenses To Manufacture Nuclear Power Reactors To Be... power reactors. (a) In the case of an application under subpart F of part 52 of this chapter for a...

  12. 10 CFR 52.163 - Administrative review of applications; hearings.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2013-01-01 2013-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...

  13. 10 CFR 52.163 - Administrative review of applications; hearings.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2011-01-01 2011-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...

  14. 10 CFR 52.163 - Administrative review of applications; hearings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2012-01-01 2012-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...

  15. 10 CFR 52.163 - Administrative review of applications; hearings.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2014-01-01 2014-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...

  16. 10 CFR 52.163 - Administrative review of applications; hearings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2010-01-01 2010-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...

  17. 10 CFR 55.59 - Requalification.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Requalification. 55.59 Section 55.59 Energy NUCLEAR... reactor startups to include a range that reactivity feedback from nuclear heat addition is noticeable and... outside containment). (AA) A nuclear instrumentation failure. (ii) Each licensed operator and senior...

  18. Aging Management Guideline for commercial nuclear power plants: Motor control centers; Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toman, G.; Gazdzinski, R.; O`Hearn, E.

    1994-02-01

    This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) commercial nuclear power plant motor control centers important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specificmore » aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.« less

  19. 10 CFR 50.54 - Conditions of licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... denote the position function, supplemented as necessary by descriptive text, rather than specific titles... responsibilities, or, alternately, the use of descriptive text; (v) The elimination of quality assurance program... requirements in appendix E of this part. A licensee authorized to possess and/or operate a research reactor or...

  20. 10 CFR 51.95 - Postconstruction environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the storage of spent fuel for the nuclear power plant within the scope of the generic determination in... a license to store spent fuel at a nuclear power reactor after expiration of the operating or... Section 51.95 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...

  1. 10 CFR 51.95 - Postconstruction environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the storage of spent fuel for the nuclear power plant within the scope of the generic determination in... a license to store spent fuel at a nuclear power reactor after expiration of the operating or... Section 51.95 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...

  2. Revised FINAL–REPORT NO. 2: INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE ENRICO FERMI ATOMIC POWER PLANT, UNIT 1, NEWPORT, MICHIGAN (DOCKET NO. 50 16; RFTA 10-004) 2018-SR-02-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Erika Bailey

    2011-10-27

    The Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1) was a fast breeder reactor design that was cooled by sodium and operated at essentially atmospheric pressure. On May 10, 1963, the Atomic Energy Commission (AEC) granted an operating license, DPR-9, to the Power Reactor Development Company (PRDC), a consortium specifically formed to own and operate a nuclear reactor at the Fermi 1 site. The reactor was designed for a maximum capability of 430 megawatts (MW); however, the maximum reactor power with the first core loading (Core A) was 200 MW. The primary system was filled with sodium in Decembermore » 1960 and criticality was achieved in August 1963. The reactor was tested at low power during the first couple years of operation. Power ascension testing above 1 MW commenced in December 1965 immediately following the receipt of a high-power operating license. In October 1966 during power ascension, zirconium plates at the bottom of the reactor vessel became loose and blocked sodium coolant flow to some fuel subassemblies. Two subassemblies started to melt and the reactor was manually shut down. No abnormal releases to the environment occurred. Forty-two months later after the cause had been determined, cleanup completed, and the fuel replaced, Fermi 1 was restarted. However, in November 1972, PRDC made the decision to decommission Fermi 1 as the core was approaching its burn-up limit. The fuel and blanket subassemblies were shipped off-site in 1973. Following that, the secondary sodium system was drained and sent off-site. The radioactive primary sodium was stored on-site in storage tanks and 55 gallon (gal) drums until it was shipped off-site in 1984. The initial decommissioning of Fermi 1 was completed in 1975. Effective January 23, 1976, DPR-9 was transferred to the Detroit Edison Company (DTE) as a 'possession only' license (DTE 2010a). This report details the confirmatory activities performed during the second Oak Ridge Institute for Science and Education (ORISE) site visit to Fermi 1 in November 2010. The survey was strategically planned during a Unit 2 (Fermi 2) outage to take advantage of decreased radiation levels that were observed and attributed to Fermi 2 from the operating unit during the first site visit. However, during the second visit there were elevated radiation levels observed and attributed to the partially dismantled Fermi 1 reactor vessel and a waste storage box located on the 3rd floor of the Fermi 1 Turbine Building. Confirmatory surveys (unshielded) performed directly in the line of sight of these areas were affected. The objective of the confirmatory survey was to verify that the final radiological conditions were accurately and adequately described in Final Status Survey (FSS) documentation, relative to the established release criteria. This objective was achieved by performing document reviews, as well as independent measurements and sampling. Specifically, documentation of the planning, implementation, and results of the FSS were evaluated; side-by-side FSS measurement and source comparisons were performed; site areas were evaluated relative to appropriate FSS classification; and areas were assessed for residual, undocumented contamination.« less

  3. 75 FR 30451 - Duke Energy Carolinas, LLC; Duke Energy Carolinas, LLC; William States Lee III Combined License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... Energy Carolinas, LLC; William States Lee III Combined License Application; Notice of Intent To Conduct a... environmental review of the William States Lee III Nuclear Station, Units 1 and 2 combined licenses application...-licensing/col/lee.html '' to `` http://www.nrc.gov/reactors/new-reactors/col/lee.html ''. Dated at Rockville...

  4. 75 FR 39985 - In the Matter of Aerotest Operations, Inc. (Aerotest Radiography and Research Reactor); Order...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ...-Ray Industries, Inc., (X-Ray), and Autoliv requested that the NRC, pursuant to of Title 10 of the Code... of Aerotest's license to possess, use, and operate the ARRR, from its current owner, Autoliv to X-Ray. Autoliv, the parent company of OEA, Inc., (which is the parent company of Aerotest) and X-Ray have entered...

  5. 77 FR 66492 - Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos.: 50-003, 50-247, 50-286; NRC-2012-0265: License Nos.: DPR- 5, DPR-26, and DPR-64] Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3, LLC; Issuance of Director's Decision Notice is hereby given that the Director, Office of Nuclear Reactor Regulation...

  6. Guideline for Performing Systematic Approach to Evaluate and Qualify Legacy Documents that Support Advanced Reactor Technology Activity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honma, George

    The establishment of a systematic process for the evaluation of historic technology information for use in advanced reactor licensing is described. Efforts are underway to recover and preserve Experimental Breeder Reactor II and Fast Flux Test Facility historical data. These efforts have generally emphasized preserving information from data-acquisition systems and hard-copy reports and entering it into modern electronic formats suitable for data retrieval and examination. The guidance contained in this document has been developed to facilitate consistent and systematic evaluation processes relating to quality attributes of historic technical information (with focus on sodium-cooled fast reactor (SFR) technology) that will bemore » used to eventually support licensing of advanced reactor designs. The historical information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The evaluation process is prescribed in terms of SFR technology, but the process can be used to evaluate historical information for any type of advanced reactor technology. An appendix provides a discussion of typical issues that should be considered when evaluating and qualifying historical information for advanced reactor technology fuel and source terms, based on current light water reactor (LWR) requirements and recent experience gained from Next Generation Nuclear Plant (NGNP).« less

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buchanan, J.R.; Keilholtz, G.W.

    This report discusses the current status of liquid-metal fast breeder (LMFBR) development and one of the principal safety issues, a hypothetical core-disruptive accident (HCDA). Bibliographic information on worldwide LMFBRs relative to the development of the breeder reactor as a safe source of nuclear power is presented for the period 1960 through 1969. The bibliography consists of 1560 abstracts covering early research and development and operating experiences leading up to the present design practices that are necessary for the licensing of breeder reactors. Key-word, author, and permuted-title indexes are included for completeness.

  8. Optimizing Characterization of Site Hydrology in Support of New Reactor Licensing at the U.S. Nuclear Regulatory Commission (Invited)

    NASA Astrophysics Data System (ADS)

    Nicholson, T. J.; Raione, R.; Ahn, H.; Barnhurst, D.; Giacinto, J.; McBride, M.; Tiruneh, N. D.

    2009-12-01

    The NRC regulates the civilian use of radioactive materials and facilities in an open and transparent manner. The NRC regulatory criteria are designed to protect human health and safety, and the environment by regulating nuclear facilities. During review of new reactor licensing applications, NRC staff reviews and independently verifies hydrogeologic information submitted by the applicant in several topical areas such as development and testing of Conceptual Site Models (CSM) which may involve perched aquifers; engineered water level fluctuations of surface-water reservoirs; ground-water collector wells and local ground-water uses; design-basis ground-water levels for structural analysis; analysis of scenarios for potential release of radionuclides to the subsurface; deep well injection of effluents; and monitoring to detect radionuclide releases. This information is reviewed in a systematic manner in accordance with NRC requirements and guidance to evaluate safety and environmental impacts and reduce the uncertainties for these impacts. NRC licensing staff is reviewing 14 applications for siting new reactors. Experience gained through these licensing activities has shown the value of using site-specific data to evaluate the CSM and its use to assess design and operational issues. Optimizing the information flow process through a systemically and thorough review process creates efficiencies. Through an iterative process of evaluating various geographical settings and associated ground-water conditions, NRC staff has developed methods to minimize prediction uncertainty through the use of confirmatory analyses performed under conservative, hierarchal approaches.

  9. 10 CFR 20.2004 - Treatment or disposal by incineration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Treatment or disposal by incineration. 20.2004 Section 20.2004 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Waste Disposal... contaminated in the course of the operation or maintenance of a nuclear power reactor licensed under part 50 of...

  10. 10 CFR 20.2004 - Treatment or disposal by incineration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Treatment or disposal by incineration. 20.2004 Section 20.2004 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Waste Disposal... contaminated in the course of the operation or maintenance of a nuclear power reactor licensed under part 50 of...

  11. 10 CFR 20.2004 - Treatment or disposal by incineration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Treatment or disposal by incineration. 20.2004 Section 20.2004 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Waste Disposal... contaminated in the course of the operation or maintenance of a nuclear power reactor licensed under part 50 of...

  12. 10 CFR 20.2004 - Treatment or disposal by incineration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Treatment or disposal by incineration. 20.2004 Section 20.2004 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Waste Disposal... contaminated in the course of the operation or maintenance of a nuclear power reactor licensed under part 50 of...

  13. 10 CFR 20.2004 - Treatment or disposal by incineration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Treatment or disposal by incineration. 20.2004 Section 20.2004 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Waste Disposal... contaminated in the course of the operation or maintenance of a nuclear power reactor licensed under part 50 of...

  14. 10 CFR 72.74 - Reports of accidental criticality or loss of special nuclear material.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... nuclear material. 72.74 Section 72.74 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR... accidental criticality or loss of special nuclear material. (a) Each licensee shall notify the NRC Operations...

  15. 10 CFR 72.74 - Reports of accidental criticality or loss of special nuclear material.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... nuclear material. 72.74 Section 72.74 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR... accidental criticality or loss of special nuclear material. (a) Each licensee shall notify the NRC Operations...

  16. 10 CFR 72.74 - Reports of accidental criticality or loss of special nuclear material.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... nuclear material. 72.74 Section 72.74 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR... accidental criticality or loss of special nuclear material. (a) Each licensee shall notify the NRC Operations...

  17. 10 CFR 72.74 - Reports of accidental criticality or loss of special nuclear material.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... nuclear material. 72.74 Section 72.74 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR... accidental criticality or loss of special nuclear material. (a) Each licensee shall notify the NRC Operations...

  18. 10 CFR 72.74 - Reports of accidental criticality or loss of special nuclear material.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... nuclear material. 72.74 Section 72.74 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR... accidental criticality or loss of special nuclear material. (a) Each licensee shall notify the NRC Operations...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Little, G.A.

    For better than ten years there was little public notice of the TRIGA reactor at UC-Berkeley. Then: a) A non-student persuaded the Student and Senate to pass a resolution to request Campus Administration to stop operation of the reactor and remove it from campus. b) Presence of the reactor became a campaign-issue in a City Mayoral election. c) Two local residents reported adverse physical reactions before, during, and after a routine tour of the reactor facility. d) The Berkeley City Council began a study of problems associated with radioactive material within the city. e) Friends Of The Earth formally petitionedmore » the NRC to terminate the reactor's license. Campus personnel have expended many man-hours and many pounds of paper in responding to these happenings. Some of the details are of interest, and may be of use to other reactor facilities. (author)« less

  20. Light Water Reactor Sustainability Program: Integrated Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the Unitedmore » States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy’s 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.« less

  1. 76 FR 78173 - Options for Developing the Regulatory Basis for Streamlining Non-Power Reactor License Renewal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... Emergency Preparedness AGENCY: Nuclear Regulatory Commission. ACTION: Notice of public meeting. SUMMARY: The... non-power reactor license renewal and non-power reactor emergency preparedness. This meeting is a... potential enhancements to emergency preparedness requirements. This meeting is open to the public. DATES...

  2. 77 FR 58419 - Guidelines for Preparing and Reviewing Licensing Applications for Instrumentation and Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... Applications for Instrumentation and Control Upgrades for Non-Power Reactors AGENCY: Nuclear Regulatory...-Power Reactors: Format and Content,'' for instrumentation and control upgrades and NUREG-1537, Part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review...

  3. 77 FR 39521 - Application for a License To Export Nuclear Reactor Major Components and Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... LLC reactor coolant equipment for four constructing four plant May 14, 2012 pumps with motors, APR1400... Emirates. XR176 monitoring and plant in Braka. 110060011 control equipment, auxiliary equipment and... NUCLEAR REGULATORY COMMISSION Application for a License To Export Nuclear Reactor Major Components...

  4. Proposed Guidance for Preparing and Reviewing Molten Salt Nonpower Reactor Licence Applications (NUREG-1537)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Belles, Randy; Flanagan, George F.; Voth, Marcus

    Development of non-power molten salt reactor (MSR) test facilities is under consideration to support the analyses needed for development of a full-scale MSR. These non-power MSR test facilities will require review by the US Nuclear Regulatory Commission (NRC) staff. This report proposes chapter adaptations for NUREG-1537 in the form of interim staff guidance to address preparation and review of molten salt non-power reactor license applications. The proposed adaptations are based on a previous regulatory gap analysis of select chapters from NUREG-1537 for their applicability to non-power MSRs operating with a homogeneous fuel salt mixture.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soubies, B.; Henry, J.Y.; Le Meur, M.

    1300 MWe pressurised water reactors (PWRs), like the 1400 MWe reactors, operate with microprocessor-based safety systems. This is particularly the case for the Digital Integrated Protection System (SPIN), which trips the reactor in an emergency and sets in action the safeguard functions. The softwares used in these systems must therefore be highly dependable in the execution of their functions. In the case of SPIN, three players are working at different levels to achieve this goal: the protection system manufacturer, Merlin Gerin; the designer of the nuclear steam supply system, Framatome; the operator of the nuclear power plants, Electricite de Francemore » (EDF), which is also responsible for the safety of its installations. Regulatory licenses are issued by the French safety authority, the Nuclear Installations Safety Directorate (French abbreviation DSIN), subsequent to a successful examination of the technical provisions adopted by the operator. This examination is carried out by the IPSN and the standing group on nuclear reactors. This communication sets out: the methods used by the manufacturer to develop SPIN software for the 1400 MWe PWRs (N4 series); the approach adopted by the IPSN to evaluate the safety software of the protection system for the N4 series of reactors.« less

  6. Interim Status Report for Risk Management for SFRs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jankovsky, Zachary Kyle; Denman, Matthew R.; Groth, Katrina

    2015-10-01

    Accident management is an important component to maintaining risk at acceptable levels for all complex systems, such as nuclear power plants. With the introduction of passive, or inherently safe, reactor designs the focus has shifted from management by operators to allowing the system's design to take advantage of natural phenomena to manage the accident. Inherently and passively safe designs are laudable, but nonetheless extreme boundary conditions can interfere with the design attributes which facilitate inherent safety, thus resulting in unanticipated and undesirable end states. This report examines an inherently safe and small sodium fast reactor experiencing a variety of beyondmore » design basis events with the intent of exploring the utility of a Dynamic Bayesian Network to infer the state of the reactor to inform the operator's corrective actions. These inferences also serve to identify the instruments most critical to informing an operator's actions as candidates for hardening against radiation and other extreme environmental conditions that may exist in an accident. This reduction in uncertainty serves to inform ongoing discussions of how small sodium reactors would be licensed and may serve to reduce regulatory risk and cost for such reactors.« less

  7. Next generation fuel irradiation capability in the High Flux Reactor Petten

    NASA Astrophysics Data System (ADS)

    Fütterer, Michael A.; D'Agata, Elio; Laurie, Mathias; Marmier, Alain; Scaffidi-Argentina, Francesco; Raison, Philippe; Bakker, Klaas; de Groot, Sander; Klaassen, Frodo

    2009-07-01

    This paper describes selected equipment and expertise on fuel irradiation testing at the High Flux Reactor (HFR) in Petten, The Netherlands. The reactor went critical in 1961 and holds an operating license up to at least 2015. While HFR has initially focused on Light Water Reactor fuel and materials, it also played a decisive role since the 1970s in the German High Temperature Reactor (HTR) development program. A variety of tests related to fast reactor development in Europe were carried out for next generation fuel and materials, in particular for Very High Temperature Reactor (V/HTR) fuel, fuel for closed fuel cycles (U-Pu and Th-U fuel cycle) and transmutation, as well as for other innovative fuel types. The HFR constitutes a significant European infrastructure tool for the development of next generation reactors. Experimental facilities addressed include V/HTR fuel tests, a coated particle irradiation rig, and tests on fast reactor, transmutation and thorium fuel. The rationales for these tests are given, results are provided and further work is outlined.

  8. AP1000{sup R} licensing and deployment in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two newmore » nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)« less

  9. 10 CFR 72.220 - Violations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.220 Violations. This general license is subject to the...

  10. 10 CFR 72.220 - Violations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.220 Violations. This general license is subject to the...

  11. COL Application Content Guide for HTGRs: Revision to RG 1.206, Part 1 - Status Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wayne Moe

    2012-08-01

    A combined license (COL) application is required by the Nuclear Regulatory Commission (NRC) for all proposed nuclear plants. The information requirements for a COL application are set forth in 10 CFR 52.79, “Contents of Applications; Technical Information in Final Safety Analysis Report.” An applicant for a modular high temperature gas-cooled reactor (HTGR) must develop and submit for NRC review and approval a COL application which conforms to these requirements. The technical information necessary to allow NRC staff to evaluate a COL application and resolve all safety issues related to a proposed nuclear plant is detailed and comprehensive. To this, Regulatorymore » Guide (RG) 1.206, “Combined License Applications for Nuclear Power Plants” (LWR Edition), was developed to assist light water reactor (LWR) applicants in incorporating and effectively formatting required information for COL application review (Ref. 1). However, the guidance prescribed in RG 1.206 presumes a LWR design proposal consistent with the systems and functions associated with large LWR power plants currently operating under NRC license.« less

  12. 78 FR 46618 - Order Prohibiting Operation of Aerotest Radiography and Research Reactor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    .... ML090830578), the NRC issued a proposed denial of the license renewal because of the foreign ownership issue... notice confirming receipt of the document. The E-Filing system also distributes an email notice that... mail, or expedited delivery service addressed to the Office of the Secretary, 16th Floor, One White...

  13. 78 FR 7818 - Duane Arnold Energy Center; Application for Amendment to Facility Operating License

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... methods: Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013... search, select ``ADAMS Public Documents'' and then select ``Begin Web- based ADAMS Search.'' For problems... INFORMATION CONTACT: Karl D. Feintuch, Project Manager, Office of Nuclear Reactor Regulation, U.S. Nuclear...

  14. 77 FR 67837 - Callaway Plant, Unit 1; Application for Amendment to Facility Operating License

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-14

    ... methods: Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2012... search, select ``ADAMS Public Documents'' and then select ``Begin Web- based ADAMS Search.'' For problems... INFORMATION CONTACT: Carl F. Lyon, Project Manager, Office of Nuclear Reactor Regulation, U.S. Nuclear...

  15. 10 CFR 26.3 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Scope. 26.3 Section 26.3 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Administrative Provisions § 26.3 Scope. (a) Licensees who are authorized to operate a nuclear power reactor under 10 CFR 50.57, and holders of a combined license under 10 CFR...

  16. 10 CFR 26.3 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Scope. 26.3 Section 26.3 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Administrative Provisions § 26.3 Scope. (a) Licensees who are authorized to operate a nuclear power reactor under 10 CFR 50.57, and holders of a combined license under 10 CFR...

  17. 10 CFR 26.3 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Scope. 26.3 Section 26.3 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Administrative Provisions § 26.3 Scope. (a) Licensees who are authorized to operate a nuclear power reactor under 10 CFR 50.57, and holders of a combined license under 10 CFR...

  18. 76 FR 50759 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... addition, the requestor/petitioner shall provide a brief explanation of the bases for the contention and a... trip, various pumps and coolers to start, and various valves to open and close), Containment Isolation (closes valves to isolate the Reactor Building interior from the environment), Steam isolation (close all...

  19. 10 CFR 26.3 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Scope. 26.3 Section 26.3 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Administrative Provisions § 26.3 Scope. (a) Licensees who are authorized to operate a nuclear power reactor under 10 CFR 50.57, and holders of a combined license under 10 CFR...

  20. 10 CFR 26.3 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Scope. 26.3 Section 26.3 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Administrative Provisions § 26.3 Scope. (a) Licensees who are authorized to operate a nuclear power reactor under 10 CFR 50.57, and holders of a combined license under 10 CFR...

  1. 77 FR 68155 - The Armed Forces Radiobiology Research Institute TRIGA Reactor: Facility Operating License No. R-84

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ... a determination by the presiding officer that the filing demonstrates good cause by satisfying the... electronic storage media. Participants may not submit paper copies of their filings unless they seek an... through Friday, excluding government holidays. Participants who believe that they have a good cause for...

  2. 78 FR 57538 - Proposed Waste Confidence Rule and Draft Generic Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ....nrc.gov/public-involve/public-meetings/index.cfm no later than 10 days prior to the meetings. Dated at... storage of spent nuclear fuel beyond a reactor's licensed life for operation and prior to ultimate... the proposed Waste Confidence rule and DGEIS in order to maximize public participation at these...

  3. 10 CFR 140.2 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Scope. 140.2 Section 140.2 Energy NUCLEAR REGULATORY... there has been an extraordinary nuclear occurrence. The form of nuclear energy liability policy for... license issued under 10 CFR parts 50, 52, or 54 to operate a nuclear reactor, and (2) With respect to an...

  4. 10 CFR 140.2 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Scope. 140.2 Section 140.2 Energy NUCLEAR REGULATORY... there has been an extraordinary nuclear occurrence. The form of nuclear energy liability policy for... license issued under 10 CFR parts 50, 52, or 54 to operate a nuclear reactor, and (2) With respect to an...

  5. 10 CFR 140.2 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Scope. 140.2 Section 140.2 Energy NUCLEAR REGULATORY... there has been an extraordinary nuclear occurrence. The form of nuclear energy liability policy for... license issued under 10 CFR parts 50, 52, or 54 to operate a nuclear reactor, and (2) With respect to an...

  6. 76 FR 60091 - Notice of Availability of Environmental Assessment and Finding of No Significant Impact for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-28

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-407; NRC-2011-0153] Notice of Availability of Environmental Assessment and Finding of No Significant Impact for the University of Utah Nuclear Reactor Facility; Facility Operating License No. R-126 AGENCY: Nuclear Regulatory Commission. ACTION: Notice of...

  7. 76 FR 20377 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... amendment requests approval of the Exelon Cyber Security Plan, provides an Implementation Schedule, and adds... require Exelon to fully implement and maintain in effect all provisions of the approved Cyber Security..., Revision 6, ``Cyber Security Plan for Nuclear Power Reactors.'' Basis for proposed no significant hazards...

  8. 10 CFR 140.2 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scope. 140.2 Section 140.2 Energy NUCLEAR REGULATORY... there has been an extraordinary nuclear occurrence. The form of nuclear energy liability policy for... license issued under 10 CFR parts 50, 52, or 54 to operate a nuclear reactor, and (2) With respect to an...

  9. 75 FR 27372 - University of New Mexico; University of New Mexico AGN-201M Reactor; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... is housed in the Nuclear Energy Laboratory (NEL) located near the southwest corner of the University.... Therefore, license renewal should not change the environmental impact of facility operation. Data from the... analysis of human health and environmental impacts presented in this environmental assessment, the proposed...

  10. 10 CFR 140.2 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Scope. 140.2 Section 140.2 Energy NUCLEAR REGULATORY... there has been an extraordinary nuclear occurrence. The form of nuclear energy liability policy for... license issued under 10 CFR parts 50, 52, or 54 to operate a nuclear reactor, and (2) With respect to an...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the Unitedmore » States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy's 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.« less

  12. 10 CFR 70.20b - General license for carriers of transient shipments of formula quantities of strategic special...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... significance, special nuclear material of low strategic significance, and irradiated reactor fuel. 70.20b..., special nuclear material of low strategic significance, and irradiated reactor fuel. (a) A general license... requirements of § 73.67 of this chapter. (3) Irradiated reactor fuel of the type and quantity subject to the...

  13. 10 CFR 70.20b - General license for carriers of transient shipments of formula quantities of strategic special...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... significance, special nuclear material of low strategic significance, and irradiated reactor fuel. 70.20b..., special nuclear material of low strategic significance, and irradiated reactor fuel. (a) A general license... requirements of § 73.67 of this chapter. (3) Irradiated reactor fuel of the type and quantity subject to the...

  14. 78 FR 54789 - Proposed Waste Confidence Rule and Draft Generic Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    .../index.cfm no later than 10 days prior to the meetings. Dated at Rockville, Maryland, this 30th day of... storage of spent nuclear fuel beyond a reactor's licensed life for operation and prior to ultimate... the proposed Waste Confidence rule and DGEIS in order to maximize public participation at these...

  15. 78 FR 65903 - Proposed Waste Confidence Rule and Draft Generic Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    .../public-involve/public-meetings/index.cfm no later than 10 days prior to each meeting. Dated at Rockville... reactor's licensed life for operation and prior to ultimate disposal (the proposed Waste Confidence rule... documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html . To begin the search...

  16. 10 CFR 52.93 - Exemptions and variances.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... referencing a nuclear power reactor manufactured under a manufacturing license issued under subpart F of this... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS..., site parameters, terms and conditions, or approved design of the manufactured reactor. The Commission...

  17. The Fundamentals and Status of Nuclear Power

    NASA Astrophysics Data System (ADS)

    Matzie, Regis A.

    2011-11-01

    Nuclear power has enormous potential to provide clean, safe base-load electricity to the world's growing population. Harnessing this potential in an economic and responsible manner is not without challenges. Safety remains the principal tenet of our operating fleet, which currently provides ˜20% of U.S. electricity generated. The performance of this fleet from economic and safety standpoints has improved dramatically over the past several decades. This nuclear generation also represents greater than 70% of the emission free electricity with hydroelectric power providing the majority of the remainder. There have been many lessons learned from the more than 50 years of experience with nuclear power and these have been factored into the new designs now being constructed worldwide. These new designs, which have enhanced safety compared to the operating fleet, have been simplified by employing passive safety systems and modular construction. There are applications for licenses of more than 20 new reactors under review by the U.S. Nuclear Regulatory Commission; the first of these licenses will be completed in early 2012, and the first new U.S. reactor will start operating in 2016. Yet there are still more improvements that can be made and these are being pursued to achieve an even greater deployment of nuclear power technology.

  18. Control console replacement at the WPI Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-01-01

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less

  19. Activation calculation for the dismantling and decommissioning of a light water reactor using MCNP™ with ADVANTG and ORIGEN-S

    NASA Astrophysics Data System (ADS)

    Schlömer, Luc; Phlippen, Peter-W.; Lukas, Bernard

    2017-09-01

    The decommissioning of a light water reactor (LWR), which is licensed under § 7 of the German Atomic Energy Act, following the post-operational phase requires a comprehensive licensing procedure including in particular radiation protection aspects and possible impacts to the environment. Decommissioning includes essential changes in requirements for the systems and components and will mainly lead to the direct dismantling. In this context, neutron induced activation calculations for the structural components have to be carried out to predict activities in structures and to estimate future costs for conditioning and packaging. To avoid an overestimation of the radioactive inventory and to calculate the expenses for decommissioning as accurate as possible, modern state-of-the-art Monte-Carlo-Techniques (MCNP™) are applied and coupled with present-day activation and decay codes (ORIGEN-S). In this context ADVANTG is used as weight window generator for MCNP™ i. e. as variance reduction tool to speed up the calculation in deep penetration problems. In this paper the calculation procedure is described and the obtained results are presented with a validation along with measured activities and photon dose rates measured in the post-operational phase. The validation shows that the applied calculation procedure is suitable for the determination of the radioactive inventory of a nuclear power plant. Even the measured gamma dose rates in the post-operational phase at different positions in the reactor building agree within a factor of 2 to 3 with the calculation results. The obtained results are accurate and suitable to support effectively the decommissioning planning process.

  20. 10 CFR 52.155 - Filing of applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... file an application for a manufacturing license under this subpart with the Director of New Reactors or the Director of Nuclear Reactor Regulation, as appropriate. (b) The application must comply with the... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...

  1. 10 CFR 52.155 - Filing of applications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... file an application for a manufacturing license under this subpart with the Director of New Reactors or the Director of Nuclear Reactor Regulation, as appropriate. (b) The application must comply with the... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...

  2. 10 CFR 52.155 - Filing of applications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... file an application for a manufacturing license under this subpart with the Director of New Reactors or the Director of Nuclear Reactor Regulation, as appropriate. (b) The application must comply with the... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...

  3. 10 CFR 52.155 - Filing of applications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... file an application for a manufacturing license under this subpart with the Director of New Reactors or the Director of Nuclear Reactor Regulation, as appropriate. (b) The application must comply with the... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...

  4. 10 CFR 52.155 - Filing of applications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... file an application for a manufacturing license under this subpart with the Director of New Reactors or the Director of Nuclear Reactor Regulation, as appropriate. (b) The application must comply with the... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...

  5. Disposition of Chicago Pile 5 (CP-5) Converter Tubes in the 10-160B Cask

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pancake, Daniel C.; Rock, Cynthia

    This paper will focus on the unique characterization, packaging, and transportation issues associated with the disposition of the two CP-5 Converter Tube assemblies from Argonne National Laboratory. The converter tubes were constructed of combinations of HEU and alloys of zirconium, and were part of the original research facilities attached to the CP-5 reactor during operating evolutions. These assemblies were heavily irradiated during their operational lifetime, and were segregated from the balance of irradiated test specimens when the reactor was deactivated and slated for Decontamination and Demolition (D&D). In addition, the substantial contribution of fissile material to the assemblies’ inventory mademore » the potential disposition pathways extremely challenging. As a result, these items became part of Argonne’s legacy “nuclear footprint”, and were added to the Nuclear Footprint Reduction Project scope for disposition. The Project was responsible for the size reduction and characterization of these items, as well as the ultimate disposition. After negotiating a disposal pathway for these tubes, there were significant transportation issues that required a small team to overcome, in order to successfully ship these items to the Nevada National Security Site (NNSS). The Project team at Argonne, technical support from transportation specialists, licensing support from the 10-160B license owner, the Savanah River National Lab (SRNL) Packaging Certification Team (PCT, and the DOE EM-33 staff contributed to license and safety analysis report amendments that eventually authorized the shipment of the material. The paper will identify the organizations, and the specific actions, required to successfully make three “one of a kind” shipments of irradiated test specimen material. This will include the unique packaging configurations, contents modification for the cask license (via the Amendment process), criticality evaluations, and associated review and approval processes.« less

  6. Phenomena Important in Molten Salt Reactor Simulations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Diamond, David J.; Brown, Nicholas R.; Denning, Richard

    The U.S. Nuclear Regulatory Commission (NRC) is preparing for the future licensing of advanced reactors that will be very different from current light water reactors. Part of the NRC preparation strategy is to identify the simulation tools that will be used for confirmatory safety analysis of normal operation and abnormal situations in those reactors. This report advances that strategy for reactors that will use molten salts (MSRs). This includes reactors with the fuel within the salt as well as reactors using solid fuel. Although both types are discussed in this report, the emphasis is on those reactors with liquid fuelmore » because of the perception that solid-fuel MSRs will be significantly easier to simulate. These liquid-fuel reactors include thermal and fast neutron spectrum alternatives. The specific designs discussed in the report are a subset of many designs being considered in the U.S. and elsewhere but they are considered the most likely to submit information to the NRC in the near future. The objective herein, is to understand the design of proposed molten salt reactors, how they will operate under normal or transient/accident conditions, and what will be the corresponding modeling needs of simulation tools that consider neutronics, heat transfer, fluid dynamics, and material composition changes in the molten salt. These tools will enable the NRC to eventually carry out confirmatory analyses that examine the validity and accuracy of applicant’s calculations and help determine the margin of safety in plant design.« less

  7. Requirements to the procedure and stages of innovative fuel development

    NASA Astrophysics Data System (ADS)

    Troyanov, V.; Zabudko, L.; Grachyov, A.; Zhdanova, O.

    2016-04-01

    According to the accepted current understanding under the nuclear fuel we will consider the assembled active zone unit (Fuel assembly) with its structural elements, fuel rods, pellet column, structural materials of fuel rods and fuel assemblies. The licensing process includes justification of safe application of the proposed modifications, including design-basis and experimental justification of the modified items under normal operating conditions and in violation of normal conditions, including accidents as well. Besides the justification of modified units itself, it is required to show the influence of modifications on the performance and safety of the other Reactor Unit’ and Nuclear Plant’ elements (e.g. burst can detection system, transportation and processing operations during fuel handling), as well as to justify the new standards of fuel storage etc. Finally, the modified fuel should comply with the applicable regulations, which often becomes a very difficult task, if only because those regulations, such as the NP-082-07, are not covered modification issues. Making amendments into regulations can be considered as the only solution, but the process is complicated and requires deep grounds for amendments. Some aspects of licensing new nuclear fuel are considered the example of mixed nitride uranium -plutonium fuel application for the BREST reactor unit.

  8. 10 CFR 2.500 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Procedures Applicable to Proceedings for the Issuance of Licenses To Manufacture Nuclear Power Reactors To Be... consideration in separate hearings of an application for a license to manufacture nuclear power reactors under... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart. 2.500 Section 2.500 Energy NUCLEAR...

  9. 78 FR 26812 - University of California, Irvine; License Renewal for University of California, Irvine Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-326; NRC-2010-0217] University of California, Irvine; License Renewal for University of California, Irvine Nuclear Reactor Facility; Supplemental Information... Renewal for University of California, Irvine Nuclear Reactor Facility,'' to inform the public that the NRC...

  10. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...

  11. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...

  12. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...

  13. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...

  14. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...

  15. AECL's Lawson optimistic about company, nuclear power

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lane, E.

    1993-01-27

    Atomic Energy of Canada Ltd. is hopeful its sale of two heavy water reactors to South Korea last September represents the end of a two-year dry spell and the beginning of better times for Canadian nuclear power research. In an hour-long interview in the company's Rockville, Md., office, AECL's newly appointed chairman, Donald Lawson, discussed his outlook for the sale of plants and services worldwide and the company's efforts to license the approximately 400 megawatt CANDU-3 nuclear plant for use in the United States. AECL's CANDU reactors offer users a number of advantages. In particular, they burn natural uranium, makingmore » it possible to load while operating, and have one of the best operating records of any commercial plant design around today.« less

  16. Core Design Characteristics of the Fluoride Salt-Cooled High Temperature Demonstration Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Nicholas R; Qualls, A L; Betzler, Benjamin R

    2016-01-01

    Fluoride salt-cooled high temperature reactors (FHRs) are a promising reactor technology option with significant knowledge gaps to implementation. One potential approach to address those technology gaps is via a small-scale demonstration reactor with the goal of increasing the technology readiness level (TRL) of the overall system for the longer term. The objective of this paper is to outline a notional concept for such a system, and to address how the proposed concept would advance the TRL of FHR concepts. Development of the proposed FHR Demonstration Reactor (DR) will enable commercial FHR deployment through disruptive and rapid technology development and demonstration.more » The FHR DR will close remaining gaps to commercial viability. Lower risk technologies are included in the initial FHR DR design to ensure that the reactor can be built, licensed, and operated within an acceptable budget and schedule. Important capabilities that will be demonstrated by building and operating the FHR DR include core design methodologies; fabrication and operation of high temperature reactors; salt procurement, handling, maintenance, and ultimate disposal; salt chemistry control to maximize vessel life; tritium management; heat exchanger performance; pump performance; and reactivity control. The FHR DR is considered part of a broader set of FHR technology development and demonstration efforts, some of which are already underway. Nonreactor test efforts (e.g., heated salt loops or loops using simulant fluids) can demonstrate many technologies necessary for commercial deployment of FHRs. The FHR DR, however, fulfills a crucial role in FHR technology development by advancing the technical maturity and readiness level of the system as a whole.« less

  17. 76 FR 23339 - Notice of Issuance of License Amendment Regarding Decommission Plan Approval; University of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-113; NRC-2009-0549] Notice of Issuance of License Amendment Regarding Decommission Plan Approval; University of Arizona Research Reactor The U.S. Nuclear... located within the University of Arizona Nuclear Reactor Laboratory (NRL) on the 325-acre campus of the...

  18. 75 FR 58447 - Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Plant License Renewal The ACRS Subcommittee on Plant License Renewal will hold a meeting on..., ``Generic Aging Lessons Learned (GALL) Report.'' The Subcommittee will hear presentations by and hold...

  19. 10 CFR 50.43 - Additional standards and provisions affecting class 103 licenses and certifications for...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...

  20. 10 CFR 50.43 - Additional standards and provisions affecting class 103 licenses and certifications for...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...

  1. 10 CFR 50.43 - Additional standards and provisions affecting class 103 licenses and certifications for...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...

  2. 10 CFR 50.43 - Additional standards and provisions affecting class 103 licenses and certifications for...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...

  3. 10 CFR 52.91 - Authorization to conduct limited work authorization activities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... determination required by 10 CFR 50.10(e), and the Director of New Reactors or the Director of Nuclear Reactor... activities. 52.91 Section 52.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.91 Authorization to conduct limited work...

  4. 10 CFR 52.91 - Authorization to conduct limited work authorization activities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... determination required by 10 CFR 50.10(e), and the Director of New Reactors or the Director of Nuclear Reactor... activities. 52.91 Section 52.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.91 Authorization to conduct limited work...

  5. 10 CFR 52.91 - Authorization to conduct limited work authorization activities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... determination required by 10 CFR 50.10(e), and the Director of New Reactors or the Director of Nuclear Reactor... activities. 52.91 Section 52.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.91 Authorization to conduct limited work...

  6. 10 CFR 52.91 - Authorization to conduct limited work authorization activities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... determination required by 10 CFR 50.10(e), and the Director of New Reactors or the Director of Nuclear Reactor... activities. 52.91 Section 52.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.91 Authorization to conduct limited work...

  7. 10 CFR 52.91 - Authorization to conduct limited work authorization activities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... determination required by 10 CFR 50.10(e), and the Director of New Reactors or the Director of Nuclear Reactor... activities. 52.91 Section 52.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.91 Authorization to conduct limited work...

  8. Control console replacement at the WPI Reactor. [Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-31

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less

  9. A Framework to Expand and Advance Probabilistic Risk Assessment to Support Small Modular Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtis Smith; David Schwieder; Robert Nourgaliev

    2012-09-01

    During the early development of nuclear power plants, researchers and engineers focused on many aspects of plant operation, two of which were getting the newly-found technology to work and minimizing the likelihood of perceived accidents through redundancy and diversity. As time, and our experience, has progressed, the realization of plant operational risk/reliability has entered into the design, operation, and regulation of these plants. But, to date, we have only dabbled at the surface of risk and reliability technologies. For the next generation of small modular reactors (SMRs), it is imperative that these technologies evolve into an accepted, encompassing, validated, andmore » integral part of the plant in order to reduce costs and to demonstrate safe operation. Further, while it is presumed that safety margins are substantial for proposed SMR designs, the depiction and demonstration of these margins needs to be better understood in order to optimize the licensing process.« less

  10. 77 FR 58590 - Determining Technical Adequacy of Probabilistic Risk Assessment for Risk-Informed License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-21

    ... reactors or for activities associated with review of applications for early site permits and combined licenses (COL) for the Office of New Reactors (NRO). DATES: The effective date of this SRP update is... Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2010-0138. Address...

  11. 10 CFR 2.621 - Acceptance and docketing of application for early review of site suitability issues in a combined...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under... Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation, as...

  12. 77 FR 27487 - License Amendment Request From The State University of New York, University of Buffalo Reactor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ... State University of New York, University of Buffalo Reactor Facility AGENCY: Nuclear Regulatory... staff at 1-800-397-4209, 301-415- 4737, or by email to [email protected] . The University of Buffalo... license amendment application from the State University of New York, University of Buffalo requesting...

  13. 10 CFR 2.629 - Finality of partial decision on site suitability issues in a combined license proceeding.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... complete and acceptable for docketing under § 2.101(a)(3), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation, as appropriate, shall determine whether the... a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION RULES OF...

  14. 10 CFR 2.629 - Finality of partial decision on site suitability issues in a combined license proceeding.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... complete and acceptable for docketing under § 2.101(a)(3), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation, as appropriate, shall determine whether the... a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION RULES OF...

  15. Analysis of decommissioning costs for the AFRRI TRIGA reactor facility. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Forsbacka, M.; Moore, M.

    1989-12-01

    This report provides a cost analysis for decommissioning the Armed Forces Radiobiology Research Institute (AFRRI) TRIGA reactor facility. AFRRI is not suggesting that the AFRRI TRIGA reactor facility be decommissioned. This report was prepared in compliance with paragraph 50.33 of Title 10, Code of Federal Regulations, which requires that funding for the decommissioning of reactor facilities be available when licensed activities cease. The planned method of decommissioning is complete decontamination (DECON) of the AFRRI TRIGA reactor site to allow for restoration of the site to full public access. The cost of DECON in 1990 dollars is estimated to be $3,200,000.more » The anticipated ancillary costs of facility site demobilization and spent fuel shipment will be an additional $600,000. Thus, the total cost of terminating reactor operations at AFRRI will be about $3,800,000. The primary basis for developing this cost estimate was a study of the decommissioning costs of similar reactor facility performed by Battelle Pacific Northwest Laboratory, as provided in U.S. Nuclear Regulatory Commission publication NUREG/CR-1756. The data in this study were adapted to reflect the decommissioning requirements of the AFRRI TRIGA reactor facility.« less

  16. The Nuclear Renaissance in the U.S.

    ScienceCinema

    Buongiorno, Jacopo

    2018-04-23

    Nuclear power currently provides 20% of the electricity generation in the U.S. and about 16% worldwide.  As a carbon-free energy source, nuclear is receiving a lot of attention by industry, lawmakers and environmental groups, as they attempt to resolve the issue of man-made climate change.  For the first time in 30 years several U.S. electric utilities have applied for construction and operation licenses of new nuclear power plants.  This talk will review the safety, operational and economic record of the existing U.S. commercial reactor fleet, will provide an overview of the reactor designs considered for the new wave of plant construction, and will discuss several research projects being conducted at the Massachusetts Institute of Technology to support the expansion of nuclear power in the U.S. and overseas.

  17. Preconceptual design of a fluoride high temperature salt-cooled engineering demonstration reactor: Motivation and overview

    DOE PAGES

    Qualls, A. Louis; Betzler, Benjamin R.; Brown, Nicholas R.; ...

    2016-12-21

    Engineering demonstration reactors are nuclear reactors built to establish proof of concept for technology options that have never been built. Examples of engineering demonstration reactors include Peach Bottom 1 for high temperature gas-cooled reactors (HTGRs) and Experimental Breeder Reactor-II (EBR-II) for sodium-cooled fast reactors. Historically, engineering demonstrations have played a vital role in advancing the technology readiness level of reactor technologies. Our paper details a preconceptual design for a fluoride salt-cooled engineering demonstration reactor. The fluoride salt-cooled high-temperature reactor (FHR) demonstration reactor (DR) is a concept for a salt-cooled reactor with 100 megawatts of thermal output (MWt). It would usemore » tristructural-isotropic (TRISO) particle fuel within prismatic graphite blocks. FLiBe (2 7LiF-BeF2) is the reference primary coolant. The FHR DR is designed to be small, simple, and affordable. Development of the FHR DR is a necessary intermediate step to enable near-term commercial FHRs. The design philosophy of the FHR DR was focused on safety, near-term deployment, and flexibility. Lower risk technologies are purposely included in the initial FHR DR design to ensure that the reactor can be built, licensed, and operated as an engineering demonstration with minimal risk and cost. These technologies include TRISO particle fuel, replaceable core structures, and consistent structural material selection for core structures and the primary and intermediate loops, and tube-and-shell primary-to-intermediate heat exchangers. Important capabilities to be demonstrated by building and operating the FHR DR include fabrication and operation of high temperature reactors; heat exchanger performance (including passive decay heat removal); pump performance; and reactivity control; salt chemistry control to maximize vessel life; tritium management; core design methodologies; salt procurement, handling, maintenance and ultimate disposal. It is recognized that non-nuclear separate and integral test efforts (e.g., heated salt loops or loops using simulant fluids) are necessary to develop the technologies that will be demonstrated in the FHR DR.« less

  18. Preconceptual design of a fluoride high temperature salt-cooled engineering demonstration reactor: Motivation and overview

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Qualls, A. Louis; Betzler, Benjamin R.; Brown, Nicholas R.

    Engineering demonstration reactors are nuclear reactors built to establish proof of concept for technology options that have never been built. Examples of engineering demonstration reactors include Peach Bottom 1 for high temperature gas-cooled reactors (HTGRs) and Experimental Breeder Reactor-II (EBR-II) for sodium-cooled fast reactors. Historically, engineering demonstrations have played a vital role in advancing the technology readiness level of reactor technologies. Our paper details a preconceptual design for a fluoride salt-cooled engineering demonstration reactor. The fluoride salt-cooled high-temperature reactor (FHR) demonstration reactor (DR) is a concept for a salt-cooled reactor with 100 megawatts of thermal output (MWt). It would usemore » tristructural-isotropic (TRISO) particle fuel within prismatic graphite blocks. FLiBe (2 7LiF-BeF2) is the reference primary coolant. The FHR DR is designed to be small, simple, and affordable. Development of the FHR DR is a necessary intermediate step to enable near-term commercial FHRs. The design philosophy of the FHR DR was focused on safety, near-term deployment, and flexibility. Lower risk technologies are purposely included in the initial FHR DR design to ensure that the reactor can be built, licensed, and operated as an engineering demonstration with minimal risk and cost. These technologies include TRISO particle fuel, replaceable core structures, and consistent structural material selection for core structures and the primary and intermediate loops, and tube-and-shell primary-to-intermediate heat exchangers. Important capabilities to be demonstrated by building and operating the FHR DR include fabrication and operation of high temperature reactors; heat exchanger performance (including passive decay heat removal); pump performance; and reactivity control; salt chemistry control to maximize vessel life; tritium management; core design methodologies; salt procurement, handling, maintenance and ultimate disposal. It is recognized that non-nuclear separate and integral test efforts (e.g., heated salt loops or loops using simulant fluids) are necessary to develop the technologies that will be demonstrated in the FHR DR.« less

  19. 10 CFR 2.629 - Finality of partial decision on site suitability issues in a combined license proceeding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation... 10 Energy 1 2014-01-01 2014-01-01 false Finality of partial decision on site suitability issues in a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES...

  20. 10 CFR 2.629 - Finality of partial decision on site suitability issues in a combined license proceeding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation... 10 Energy 1 2013-01-01 2013-01-01 false Finality of partial decision on site suitability issues in a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES...

  1. 10 CFR 52.98 - Finality of combined licenses; information requests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...

  2. 10 CFR 52.98 - Finality of combined licenses; information requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...

  3. 10 CFR 52.98 - Finality of combined licenses; information requests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...

  4. 10 CFR 52.98 - Finality of combined licenses; information requests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...

  5. 10 CFR 52.98 - Finality of combined licenses; information requests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...

  6. Development of 3D pseudo pin-by-pin calculation methodology in ANC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, B.; Mayhue, L.; Huria, H.

    2012-07-01

    Advanced cores and fuel assembly designs have been developed to improve operational flexibility, economic performance and further enhance safety features of nuclear power plants. The simulation of these new designs, along with strong heterogeneous fuel loading, have brought new challenges to the reactor physics methodologies currently employed in the industrial codes for core analyses. Control rod insertion during normal operation is one operational feature in the AP1000{sup R} plant of Westinghouse next generation Pressurized Water Reactor (PWR) design. This design improves its operational flexibility and efficiency but significantly challenges the conventional reactor physics methods, especially in pin power calculations. Themore » mixture loading of fuel assemblies with significant neutron spectrums causes a strong interaction between different fuel assembly types that is not fully captured with the current core design codes. To overcome the weaknesses of the conventional methods, Westinghouse has developed a state-of-the-art 3D Pin-by-Pin Calculation Methodology (P3C) and successfully implemented in the Westinghouse core design code ANC. The new methodology has been qualified and licensed for pin power prediction. The 3D P3C methodology along with its application and validation will be discussed in the paper. (authors)« less

  7. Technical Letter Report: Evaluation and Analysis of a Few International Periodic Safety Review Summary Reports

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chopra, Omesh K.; Diercks, Dwight R.; Ma, David Chia-Chiun

    At the request of the United States (U.S.) government, the International Atomic Energy Agency (IAEA) assembled a team of 20 senior safety experts to review the regulatory framework for the safety of operating nuclear power plants in the United States. This review focused on the effectiveness of the regulatory functions implemented by the NRC and on its commitment to nuclear safety and continuous improvement. One suggestion resulting from that review was that the U.S. Nuclear Regulatory Commission (NRC) incorporate lessons learned from periodic safety reviews (PSRs) performed in other countries as an input to the NRC’s assessment processes. In themore » U.S., commercial nuclear power plants (NPPs) are granted an initial 40-year operating license, which may be renewed for additional 20-year periods, subject to complying with regulatory requirements. The NRC has established a framework through its inspection, and operational experience processes to ensure the safe operation of licensed nuclear facilities on an ongoing basis. In contrast, most other countries do not impose a specific time limit on the operating licenses for NPPs, they instead require that the utility operating the plant perform PSRs, typically at approximately 10-year intervals, to assure continued safe operation until the next assessment. The staff contracted with Argonne National Laboratory (Argonne) to perform a pilot review of selected translated PSR assessment reports and related documentation from foreign nuclear regulatory authorities to identify any potential new regulatory insights regarding license renewal-related topics and NPP operating experience (OpE). A total of 14 PSR assessment documents from 9 countries were reviewed. For all of the countries except France, individual reports were provided for each of the plants reviewed. In the case of France, three reports were provided that reviewed the performance assessment of thirty-four 900-MWe reactors of similar design commissioned between 1978 and 1988. All of the reports reviewed were the regulator’s assessment of the PSR findings rather than the original PSR report, and all but one were English translations from the original language. In these reviews, it was found that most of the countries base their regulatory guidance to some extent (and often to a large extent) on U.S. design codes and standards, NRC regulatory guidance, and U.S. industry guidance. In addition, many of the observed operational technical issues and OpE events reported for U.S. reactors are also cited in the PSR reports. The PSR reports also identified a number of potential technical material/component performance issues and OpE events that are not commonly reported for U.S. plants.« less

  8. Laboratory instrumentation modernization at the WPI Nuclear Reactor Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1995-01-01

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Program several laboratory instruments utilized by students and researchers at the WPI Nuclear Reactor Facility have been upgraded or replaced. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The low power output of the reactor and an ergonomicmore » facility design make it an ideal tool for undergraduate nuclear engineering education and other training. The reactor, its control system, and the associate laboratory equipment are all located in the same room. Over the years, several important milestones have taken place at the WPI reactor. In 1969, the reactor power level was upgraded from 1 kW to 10 kW. The reactor`s Nuclear Regulatory Commission operating license was renewed for 20 years in 1983. In 1988, under DOE Grant No. DE-FG07-86ER75271, the reactor was converted to low-enriched uranium fuel. In 1992, again with partial funding from DOE (Grant No. DE-FG02-90ER12982), the original control console was replaced.« less

  9. 5 CFR 5801.102 - Prohibited securities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... licenses for facilities which generate electric energy by means of a nuclear reactor; (2) State or local... reactor or a low-level waste facility; (3) Entities manufacturing or selling nuclear power or test reactors; (4) Architectural-engineering companies providing services relating to a nuclear power reactor...

  10. 5 CFR 5801.102 - Prohibited securities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... licenses for facilities which generate electric energy by means of a nuclear reactor; (2) State or local... reactor or a low-level waste facility; (3) Entities manufacturing or selling nuclear power or test reactors; (4) Architectural-engineering companies providing services relating to a nuclear power reactor...

  11. 77 FR 37074 - License Amendment Request From the Alan J. Blotcky Reactor Facility

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... the Alan J. Blotcky Reactor Facility AGENCY: Nuclear Regulatory Commission. ACTION: Notice of... section of this document. FOR FURTHER INFORMATION CONTACT: Theodore Smith, Project Manager, Reactor... provided the first time that a document is referenced. The Alan J. Blotcky Reactor Facility Decommissioning...

  12. Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benoit, Timothy; Hlotke, John Daniel; Yacout, Abdellatif

    2017-07-05

    This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel and/or related reactor fuel designs and constituency will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generatedmore » during the US Integral Fast Reactor program between 1984-1994, where the data includes, but is not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs.« less

  13. NUCLEAR NEW BUILD-INTEGRATING CULTURAL DIFFERENCES IN RADIATION PROTECTION.

    PubMed

    Haemmerli, Valentin; Bryant, Peter A; Cole, Peter

    2017-04-01

    Across the world, we are seeing a resurgence in Nuclear New Build. In the UK alone, plans are under way for the construction of 10 new reactors, using 4 different reactor designs all of which are to be provided by foreign vendors, and operated by 3 newly formed licensees within the UK. As these new licensees embark on the task of establishing themselves and progressing the design and build of these reactors, there are challenges faced in integrating the Radiation Protection Requirements and Culture from the various Foreign Investors and Vendors into the UK 'Context'. The following paper identifies the origin of the Radiation Protection Requirements within the UK and foreign investor/vendor countries, in an attempt to integrate them into the UK licensing and approval process. Thus, allowing due credit to be taken for the regulatory regime of the foreign countries where these reactors originate. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  14. 10 CFR 171.21 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false [Reserved] 171.21 Section 171.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ANNUAL FEES FOR REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS LICENSES, INCLUDING HOLDERS OF CERTIFICATES OF COMPLIANCE, REGISTRATIONS, AND QUALITY ASSURANCE PROGRAM APPROVALS AND...

  15. Phase 1 environmental report for the Advanced Neutron Source at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blasing, T.J.; Brown, R.A.; Cada, G.F.

    1992-02-01

    The US Department of Energy (DOE) has proposed the construction and operation of the Advanced Neutron Source (ANS), a 330-MW(f) reactor, at Oak Ridge National Laboratory (ORNL) to support neutron scattering and nuclear physics experiments. ANS would provide a steady-state source of neutrons that are thermalized to produce sources of hot, cold, and very coal neutrons. The use of these neutrons in ANS experiment facilities would be an essential component of national research efforts in basic materials science. Additionally, ANS capabilities would include production of transplutonium isotopes, irradiation of potential fusion and fission reactor materials, activation analysis, and production ofmore » medical and industrial isotopes such as {sup 252}Cf. Although ANS would not require licensing by the US Nuclear Regulatory Commission (NRC), DOE regards the design, construction, and operation of ANS as activities that would produce a licensable facility; that is, DOE is following the regulatory guidelines that NRC would apply if NRC were licensing the facility. Those guidelines include instructions for the preparation of an environmental report (ER), a compilation of available data and preliminary analyses regarding the environmental impacts of nuclear facility construction and operation. The ER, described and outlined in NRC Regulatory Guide 4.2, serves as a background document to facilitate the preparation of environmental impact statements (EISs). Using Regulatory Guide 4.2 as a model, this ANS ER provides analyses and information specific to the ANS site and area that can be adopted (and modified, if necessary) for the ANS EIS. The ER is being prepared in two phases. Phase 1 ER includes many of the data and analyses needed to prepare the EIS but does not include data or analyses of alternate sites or alternate technologies. Phase 2 ER will include the additional data and analyses stipulated by Regulatory Guide 4.2.« less

  16. Thermal-hydraulic analysis capabilities and methods development at NYPA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feltus, M.A.

    1987-01-01

    The operation of a nuclear power plant must be regularly supported by various thermal-hydraulic (T/H) analyses that may include final safety analysis report (FSAR) design basis calculations and licensing evaluations and conservative and best-estimate analyses. The development of in-house T/H capabilities provides the following advantages: (a) it leads to a better understanding of the plant design basis and operating characteristics; (b) methods developed can be used to optimize plant operations and enhance plant safety; (c) such a capability can be used for design reviews, checking vendor calculations, and evaluating proposed plant modifications; and (d) in-house capability reduces the cost ofmore » analysis. This paper gives an overview of the T/H capabilities and current methods development activity within the engineering department of the New York Power Authority (NYPA) and will focus specifically on reactor coolant system (RCS) transients and plant dynamic response for non-loss-of-coolant accident events. This paper describes NYPA experience in performing T/H analyses in support of pressurized water reactor plant operation.« less

  17. 1996 NRC annual report. Volume 13

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-10-01

    This 22nd annual report of the US Nuclear Regulatory Commission (NRC) describes accomplishments, activities, and plans made during Fiscal Year 1996 (FH 1996)--October 1, 1995, through September 30, 1996. Significant activities that occurred early in FY 1997 are also described, particularly changes in the Commission and organization of the NRC. The mission of the NRC is to ensure that civilian uses of nuclear materials in the US are carried out with adequate protection of public health and safety, the environment, and national security. These uses include the operation of nuclear power plants and fuel cycle plants and medical, industrial, andmore » research applications. Additionally, the NRC contributes to combating the proliferation of nuclear weapons material worldwide. The NRC licenses and regulates commercial nuclear reactor operations and research reactors and other activities involving the possession and use of nuclear materials and wastes. It also protects nuclear materials used in operation and facilities from theft or sabotage. To accomplish its statutorily mandated regulatory mission, the NRC issues rules and standards, inspects facilities and operations, and issues any required enforcement actions.« less

  18. 10 CFR 171.9 - Communications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Communications. 171.9 Section 171.9 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ANNUAL FEES FOR REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS... APPROVALS AND GOVERNMENT AGENCIES LICENSED BY THE NRC § 171.9 Communications. All communications concerning...

  19. 10 CFR 171.9 - Communications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Communications. 171.9 Section 171.9 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ANNUAL FEES FOR REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS... APPROVALS AND GOVERNMENT AGENCIES LICENSED BY THE NRC § 171.9 Communications. All communications concerning...

  20. 10 CFR 171.9 - Communications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Communications. 171.9 Section 171.9 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ANNUAL FEES FOR REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS... APPROVALS AND GOVERNMENT AGENCIES LICENSED BY THE NRC § 171.9 Communications. All communications concerning...

  1. NGNP High Temperature Materials White Paper

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lew Lommers; George Honma

    2012-08-01

    This white paper is one in a series of white papers that address key generic issues of the combined construction and operating license (COL) pre-application program key generic issues for the Next Generation Nuclear Plant reactor using the prismatic block fuel technology. The purpose of the pre-application program interactions with the NRC staff is to reduce the time required for COL application review by identifying and addressing key regulatory issues and, if possible, obtaining agreements for their resolution

  2. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...

  3. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...

  4. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...

  5. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...

  6. 10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors..., including expected occurrences, as low as is reasonably achievable, each licensee of a nuclear power reactor...

  7. 10 CFR 1.44 - Office of New Reactors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Office of New Reactors. 1.44 Section 1.44 Energy NUCLEAR... Office of New Reactors. The Office of New Reactors— (a) Develops, promulgates and implements regulations... safeguarding of nuclear reactor facilities licensed under part 52 of this chapter prior to initial commencement...

  8. 10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors..., including expected occurrences, as low as is reasonably achievable, each licensee of a nuclear power reactor...

  9. 10 CFR 1.44 - Office of New Reactors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Office of New Reactors. 1.44 Section 1.44 Energy NUCLEAR... Office of New Reactors. The Office of New Reactors— (a) Develops, promulgates and implements regulations... safeguarding of nuclear reactor facilities licensed under part 52 of this chapter prior to initial commencement...

  10. 10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors..., including expected occurrences, as low as is reasonably achievable, each licensee of a nuclear power reactor...

  11. 10 CFR 1.44 - Office of New Reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Office of New Reactors. 1.44 Section 1.44 Energy NUCLEAR... safeguarding of nuclear reactor facilities licensed under part 52 of this chapter prior to initial commencement... Office of New Reactors. The Office of New Reactors— (a) Develops, promulgates and implements regulations...

  12. 10 CFR 1.44 - Office of New Reactors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Office of New Reactors. 1.44 Section 1.44 Energy NUCLEAR... safeguarding of nuclear reactor facilities licensed under part 52 of this chapter prior to initial commencement... Office of New Reactors. The Office of New Reactors— (a) Develops, promulgates and implements regulations...

  13. 10 CFR 1.44 - Office of New Reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Office of New Reactors. 1.44 Section 1.44 Energy NUCLEAR... safeguarding of nuclear reactor facilities licensed under part 52 of this chapter prior to initial commencement... Office of New Reactors. The Office of New Reactors— (a) Develops, promulgates and implements regulations...

  14. RETRAN analysis of multiple steam generator blow down caused by an auxiliary feedwater steam-line break

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feltus, M.A.

    1987-01-01

    Analysis results for multiple steam generator blow down caused by an auxiliary feedwater steam-line break performed with the RETRAN-02 MOD 003 computer code are presented to demonstrate the capabilities of the RETRAN code to predict system transient response for verifying changes in operational procedures and supporting plant equipment modifications. A typical four-loop Westinghouse pressurized water reactor was modeled using best-estimate versus worst case licensing assumptions. This paper presents analyses performed to evaluate the necessity of implementing an auxiliary feedwater steam-line isolation modification. RETRAN transient analysis can be used to determine core cooling capability response, departure from nucleate boiling ratio (DNBR)more » status, and reactor trip signal actuation times.« less

  15. 10 CFR 55.5 - Communications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... Nuclear Regulatory Commission, Washington, DC 20555-0001. The guidance discusses, among other topics, the.... (b)(1) Except for test and research reactor facilities, the Director, Office of Nuclear Reactor... involving a test and research reactor facility licensed under 10 CFR part 50 and any related inquiry...

  16. 10 CFR 55.5 - Communications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... Nuclear Regulatory Commission, Washington, DC 20555-0001. The guidance discusses, among other topics, the.... (b)(1) Except for test and research reactor facilities, the Director, Office of Nuclear Reactor... involving a test and research reactor facility licensed under 10 CFR part 50 and any related inquiry...

  17. 10 CFR 72.16 - Filing of application for specific license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Filing of application for specific license. 72.16 Section 72.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...

  18. 10 CFR 72.60 - Modification, revocation, and suspension of license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Modification, revocation, and suspension of license. 72.60 Section 72.60 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...

  19. 10 CFR 72.56 - Application for amendment of license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Application for amendment of license. 72.56 Section 72.56 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE...

  20. 10 CFR 72.42 - Duration of license; renewal.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Duration of license; renewal. 72.42 Section 72.42 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Issuance and...

  1. 10 CFR 72.40 - Issuance of license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Issuance of license. 72.40 Section 72.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Issuance and Conditions of...

  2. 10 CFR 72.16 - Filing of application for specific license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Filing of application for specific license. 72.16 Section 72.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...

  3. 75 FR 76923 - Domestic Licensing of Production and Utilization Facilities; Updates to Incorporation by...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ..., Classified information, Criminal penalties, Fire protection, Intergovernmental relations, Nuclear power plants and reactors, Radiation protection, Reactor siting criteria, Reporting and recordkeeping...

  4. Light Water Reactor Sustainability Program Integrated Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCarthy, Kathryn A.; Busby, Jeremy; Hallbert, Bruce

    2014-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution tomore » the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.« less

  5. 10 CFR 55.5 - Communications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Nuclear Regulatory Commission, Washington, DC 20555-0001. The guidance discusses, among other topics, the.... (b)(1) Except for test and research reactor facilities, the Director, Office of Nuclear Reactor... this part involving a test and research reactor facility licensed under 10 CFR part 50 and any related...

  6. 10 CFR 2.1105 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Nuclear Fuel Storage Capacity at Civilian Nuclear Power Reactors § 2.1105 Definitions. As used in this part: (a) Civilian nuclear power reactor means a civilian nuclear power plant required to be licensed... nuclear fuel means fuel that has been withdrawn from a nuclear reactor following irradiation, the...

  7. 10 CFR 2.1105 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Nuclear Fuel Storage Capacity at Civilian Nuclear Power Reactors § 2.1105 Definitions. As used in this part: (a) Civilian nuclear power reactor means a civilian nuclear power plant required to be licensed... nuclear fuel means fuel that has been withdrawn from a nuclear reactor following irradiation, the...

  8. 10 CFR Appendix A to Part 52 - Design Certification Rule for the U.S. Advanced Boiling Water Reactor

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Water Reactor A Appendix A to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES... Rule for the U.S. Advanced Boiling Water Reactor I. Introduction Appendix A constitutes the standard design certification for the U.S. Advanced Boiling Water Reactor (ABWR) design, in accordance with 10 CFR...

  9. 10 CFR Appendix A to Part 52 - Design Certification Rule for the U.S. Advanced Boiling Water Reactor

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Water Reactor A Appendix A to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES... Rule for the U.S. Advanced Boiling Water Reactor I. Introduction Appendix A constitutes the standard design certification for the U.S. Advanced Boiling Water Reactor (ABWR) design, in accordance with 10 CFR...

  10. 10 CFR 50.64 - Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... domestic non-power reactors. 50.64 Section 50.64 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... Director of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC... Director of the Office of Nuclear Reactor Regulation a written proposal for meeting the requirements of...

  11. 10 CFR 50.64 - Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... domestic non-power reactors. 50.64 Section 50.64 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... Director of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC... Director of the Office of Nuclear Reactor Regulation a written proposal for meeting the requirements of...

  12. 10 CFR 50.64 - Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... domestic non-power reactors. 50.64 Section 50.64 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... Director of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC... Director of the Office of Nuclear Reactor Regulation a written proposal for meeting the requirements of...

  13. Methods and strategies for future reactor safety goals

    NASA Astrophysics Data System (ADS)

    Arndt, Steven Andrew

    There have been significant discussions over the past few years by the United States Nuclear Regulatory Commission (NRC), the Advisory Committee on Reactor Safeguards (ACRS), and others as to the adequacy of the NRC safety goals for use with the next generation of nuclear power reactors to be built in the United States. The NRC, in its safety goals policy statement, has provided general qualitative safety goals and basic quantitative health objectives (QHOs) for nuclear reactors in the United States. Risk metrics such as core damage frequency (CDF) and large early release frequency (LERF) have been used as surrogates for the QHOs. In its review of the new plant licensing policy the ACRS has looked at the safety goals, as has the NRC. A number of issues have been raised including what the Commission had in mind when it drafted the safety goals and QHOs, how risk from multiple reactors at a site should be combined for evaluation, how the combination of a new and old reactor at the same site should be evaluated, what the criteria for evaluating new reactors should be, and whether new reactors should be required to be safer than current generation reactors. As part of the development and application of the NRC safety goal policy statement the Commissioners laid out the expectations for the safety of a nuclear power plant but did not address the risk associated with current multi-unit sites, potential modular reactor sites, and hybrid sites that could contain current generation reactors, new passive reactors, and/or modular reactors. The NRC safety goals and the QHOs refer to a "nuclear power plant," but do not discuss whether a "plant" refers to only a single unit or all of the units on a site. There has been much discussion on this issue recently due to the development of modular reactors. Additionally, the risk of multiple reactor accidents on the same site has been largely ignored in the probabilistic risk assessments (PRAs) done to date, and in most risk-informed analyses and discussions. This dissertation examines potential approaches to updating the safety goals that include the establishment of new quantitative safety goal associated with the comparative risk of generating electricity by viable competing technologies and modifications of the goals to account for multi-plant reactor sites, and issues associated with the use of safety goals in both initial licensing and operational decision making. This research develops a new quantitative health objective that uses a comparable benefit risk metric based on the life-cycle risk of the construction, operation and decommissioning of a comparable non-nuclear electric generation facility, as well as the risks associated with mining and transportation. This dissertation also evaluates the effects of using various methods for aggregating site risk as a safety metric, as opposed to using single plant safety goals. Additionally, a number of important assumptions inherent in the current safety goals, including the effect of other potential negative societal effects such as the generation of greenhouse gases (e.g., carbon dioxide) have on the risk of electric power production and their effects on the setting of safety goals, is explored. Finally, the role risk perception should play in establishing safety goals has been explored. To complete this evaluation, a new method to analytically compare alternative technologies of generating electricity was developed, including development of a new way to evaluate risk perception, and a new method was developed for evaluating the risk at multiple units on a single site. To test these modifications to the safety goals a number of possible reactor designs and configurations were evaluated using these new proposed safety goals to determine the goals' usefulness and utility. The results of the analysis showed that the modifications provide measures that more closely evaluate the potential risk to the public from the operation of nuclear power plants than the current safety goals, while still providing a straight-forward process for assessment of reactor design and operation.

  14. Trace-element characterization of evidential cannabis sative samples using k{sub 0}-standardization methodology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henderson, D.P. Jr.; Vernetson, W.G.; Ratner, R.T.

    The University of Florida Training Reactor (UFTR) facilities including the analytical laboratory are used for a wide range of educational, research, training, and service functions. The UFTR is a 100-kW light-water-cooled, graphite-and-water-moderated modified Argonaut-type reactor. The UFTR utilizes high enriched plate-type fuel in a two-slab arrangement and operates at a 100-kW power level. Since first licensed to operate at 10 kW in 1959, this nonpower reactor facility has had an active but evolving record of continuous service to a wide range of academic, utility, and community users. The services of the UFTR have also been used by various state authoritiesmore » in criminal investigations. Because of its relatively low power and careful laboratory analyses, the UFTR neutron flux characteristics in several ports are not only well characterized but they are also quite invariant with time. As a result, such a facility is well-suited to the application of the multielement analysis using the k{sub o}-standardization method of neutron activation analysis. The analysis of untreated evidential botanical samples presented a unique opportunity to demonstrate implementation of this method at the UFTR facilities.« less

  15. Safety and Regulatory Issues of the Thorium Fuel Cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ade, Brian; Worrall, Andrew; Powers, Jeffrey

    2014-02-01

    Thorium has been widely considered an alternative to uranium fuel because of its relatively large natural abundance and its ability to breed fissile fuel (233U) from natural thorium (232Th). Possible scenarios for using thorium in the nuclear fuel cycle include use in different nuclear reactor types (light water, high temperature gas cooled, fast spectrum sodium, molten salt, etc.), advanced accelerator-driven systems, or even fission-fusion hybrid systems. The most likely near-term application of thorium in the United States is in currently operating light water reactors (LWRs). This use is primarily based on concepts that mix thorium with uranium (UO2 + ThO2),more » add fertile thorium (ThO2) fuel pins to LWR fuel assemblies, or use mixed plutonium and thorium (PuO2 + ThO2) fuel assemblies. The addition of thorium to currently operating LWRs would result in a number of different phenomenological impacts on the nuclear fuel. Thorium and its irradiation products have nuclear characteristics that are different from those of uranium. In addition, ThO2, alone or mixed with UO2 fuel, leads to different chemical and physical properties of the fuel. These aspects are key to reactor safety-related issues. The primary objectives of this report are to summarize historical, current, and proposed uses of thorium in nuclear reactors; provide some important properties of thorium fuel; perform qualitative and quantitative evaluations of both in-reactor and out-of-reactor safety issues and requirements specific to a thorium-based fuel cycle for current LWR reactor designs; and identify key knowledge gaps and technical issues that need to be addressed for the licensing of thorium LWR fuel in the United States.« less

  16. FFTF Passive Safety Test Data for Benchmarks for New LMR Designs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wootan, David W.; Casella, Andrew M.

    Liquid Metal Reactors (LMRs) continue to be considered as an attractive concept for advanced reactor design. Software packages such as SASSYS are being used to im-prove new LMR designs and operating characteristics. Significant cost and safety im-provements can be realized in advanced liquid metal reactor designs by emphasizing inherent or passive safety through crediting the beneficial reactivity feedbacks associ-ated with core and structural movement. This passive safety approach was adopted for the Fast Flux Test Facility (FFTF), and an experimental program was conducted to characterize the structural reactivity feedback. The FFTF passive safety testing pro-gram was developed to examine howmore » specific design elements influenced dynamic re-activity feedback in response to a reactivity input and to demonstrate the scalability of reactivity feedback results to reactors of current interest. The U.S. Department of En-ergy, Office of Nuclear Energy Advanced Reactor Technology program is in the pro-cess of preserving, protecting, securing, and placing in electronic format information and data from the FFTF, including the core configurations and data collected during the passive safety tests. Benchmarks based on empirical data gathered during operation of the Fast Flux Test Facility (FFTF) as well as design documents and post-irradiation examination will aid in the validation of these software packages and the models and calculations they produce. Evaluation of these actual test data could provide insight to improve analytical methods which may be used to support future licensing applications for LMRs« less

  17. Leasing of Nuclear Power Plants With Using Floating Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuznetsov, Yu.N.; Gabaraev, B.A.; Reshetov, V.A.

    2002-07-01

    The proposal to organize and realize the international program on leasing of Nuclear Power Plant (NPP) reactor compartments is brought to the notice of potential partners. The proposal is oriented to the construction of new NPPs or to replacement of worked-out reactor units of the NPPs in operation on the sites situated near water area and to the use of afloat technologies for construction, mounting and transportation of reactor units as a Reactor Compartment Block Module (RCBM). According to the offered project the RCBM is fabricated in factory conditions at the largest Russian defense shipbuilding plant - State Unitary Enterprisemore » 'Industrial Association SEVMASHPREDPRIYATIE' (SEVMASH) in the city of Severodvinsk of the Arkhangelsk region. After completion of assembling, testing and preliminary licensing the RCBM is given buoyancy by means of hermetic sealing and using pontoons and barges. The RCBM delivery to the NPP site situated near water area is performed by sea route. The RCBM is brought to the place of its installation with the use of appropriate hydraulic structures (canals, shipping locks), then is lowered on the basement constructed beforehand and incorporated into NPP scheme, of which the components are installed in advance. Floating means can be detached from the RCBM and used repeatedly for other RCBMs. Further procedure of NPP commissioning and its operation is carried out according to traditional method by power company in the framework of RCBM leasing with enlisting the services of firm-manufacturer's specialists either to provide reactor plant operation and concomitant processes or to perform author's supervision of operation. After completion of lifetime and reactor unloading the RCBM is dismantled with using the same afloat technology and taken away from NPP site to sea area entirely, together with its structures (reactor vessel, heat exchangers, pumps, pipelines and other equipment). Then RCBM is transported by shipping route to a firm-manufacturer, for subsequent reprocessing, utilization and storage. Nuclear fuel and radioactive wastes are removed from NPP site also. Use of leasing method removes legal problems connected with the transportation of radioactive materials through state borders as the RCBM remains a property of the state-producer at all stages of its life cycle. (authors)« less

  18. 77 FR 41206 - Guidelines for Preparing and Reviewing Licensing Applications for Instrumentation and Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... Applications for Instrumentation and Control Upgrades for Non-Power Reactors AGENCY: Nuclear Regulatory... (NRC or the Commission) is requesting public comment on Chapter 7, Section 7.3, Reactor Control System...-Power Reactors: Format and Content,'' for instrumentation and control (I&C) upgrades and NUREG-1537...

  19. 10 CFR 140.96 - Appendix F-Indemnity locations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction area of the nuclear power reactor, as determined by the Commission. Such area will not necessarily... or combined license under 10 CFR part 52 is issued for such additional nuclear power reactors. (2) In... an existing nuclear power reactor, the geographical boundaries of the indemnity location shall...

  20. 77 FR 26050 - Burnup Credit in the Criticality Safety Analyses of Pressurized Water Reactor Spent Fuel in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... Pressurized Water Reactor Spent Fuel in Transportation and Storage Casks AGENCY: Nuclear Regulatory Commission... of pressurized water reactor spent nuclear fuel (SNF) in transportation packages and storage casks... for the licensing basis, (b) provide recommendations regarding advanced isotopic depletion and...

  1. 10 CFR 50.44 - Combustible gas control for nuclear power reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Combustible gas control for nuclear power reactors. 50.44 Section 50.44 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... for nuclear power reactors. (a) Definitions—(1) Inerted atmosphere means a containment atmosphere with...

  2. 10 CFR 50.44 - Combustible gas control for nuclear power reactors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Combustible gas control for nuclear power reactors. 50.44 Section 50.44 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... for nuclear power reactors. (a) Definitions—(1) Inerted atmosphere means a containment atmosphere with...

  3. 75 FR 11375 - Revision of Fee Schedules; Fee Recovery for FY 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Spent Fuel Storage/Reactor Decommissioning..... 2.7 0.2 0.2 Test and Research Reactors 0.2 0.0 0.0 Fuel... categories of licenses. The FY 2009 fee is also shown for comparative purposes. Table V--Rebaselined Annual...) Spent Fuel Storage/Reactor 122,000 143,000 Decommissioning Test and Research Reactors (Non-power 87,600...

  4. 10 CFR 50.64 - Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... domestic non-power reactors. 50.64 Section 50.64 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... Permits § 50.64 Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors. (a) Applicability. The requirements of this section apply to all non-power reactors. (b) Requirements. (1) The...

  5. 10 CFR 50.64 - Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... domestic non-power reactors. 50.64 Section 50.64 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... Permits § 50.64 Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors. (a) Applicability. The requirements of this section apply to all non-power reactors. (b) Requirements. (1) The...

  6. Annual Report to Congress of the Atomic Energy Commission for 1969

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seaborg, Glenn T.

    1970-01-31

    The document represents the 1969 Annual Report of the Atomic Energy Commission (AEC) to Congress. The report opens with ''An Introduction to the Atomic Energy Programs during 1969'' followed by 17 Chapters, 8 appendices and an index. Chapters are as follows: (1) Source, Special, and Byproduct Nuclear Materials; (2) Nuclear Materials Safeguards; (3) The Nuclear Defense Effort; (4) Naval Propulsion Reactors; (5) Reactor Development and Technology; (6) Licensing and Regulating the Atom; (7) Operational and Public Safety; (8) Space Nuclear Propulsion; (9) Specialized Nuclear Power; (10) Isotopic Radiation Applications; (11) Peaceful Nuclear Explosives; (12) International Affairs and Cooperation; (13) Informationalmore » and Related Activities; (14) Nuclear Education and Training; (15) Biomedical and Physical Research; (16) Industrial Participation Aspects; and, (17) Administrative and Management Matters.« less

  7. Annual Report to Congress of the Atomic Energy Commission for 1968

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seaborg, Glenn T.

    1969-01-31

    The document represents the 1968 Annual Report of the Atomic Energy Commission (AEC) to Congress. The report opens with ''An Introduction to the Atomic Energy Programs during 1968'' followed by 17 Chapters, 8 appendices and an index. Chapters are as follows: (1) Source, Special, and Nuclear Byproduct Materials; (2) Nuclear Materials Safeguards; (3) The Nuclear Defense Effort; (4) Naval Propulsion Reactors; (5) Reactor Development and Technology; (6) Licensing and Regulating the Atom; (7) Operational and Public Safety; (8) Nuclear Rocket Propulsion; (9) Specialized Nuclear Power; (10) Isotopic Radiation Applications; (11) Peaceful Nuclear Explosives; (12) International Affairs and Cooperation; (13) Informationalmore » and Related Activities; (14) Nuclear Education and Training; (15) Biomedical and Physical Research; (16) Industrial Participation Aspects; and, (17) Administrative and Management Matters.« less

  8. 10 CFR 50.21 - Class 104 licenses; for medical therapy and research and development facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Class 104 licenses; for medical therapy and research and...; for medical therapy and research and development facilities. A class 104 license will be issued, to an... Administration entered into under the Cooperative Power Reactor Demonstration Program, except as otherwise...

  9. 10 CFR 2.629 - Finality of partial decision on site suitability issues in a combined license proceeding.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION RULES OF... Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part 52... complete and acceptable for docketing under § 2.101(a)(3), the Director of the Office of New Reactors or...

  10. 78 FR 4465 - PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... License Application for Bell Bend Nuclear Power Plant; Exemption 1.0 Background PPL Bell Bend, LLC... Regulations (10 CFR), Subpart C of Part 52, ``Licenses, Certifications, and Approvals for Nuclear Power Plants.'' This reactor is to be identified as Bell Bend Nuclear Power Plant (BBNPP), in Salem County...

  11. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS Radio Operator's... Radiotelephone Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar...

  12. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS Radio Operator's... Radiotelephone Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar...

  13. Superphenix: Restarting, with emphasis on research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-04-01

    French Prime Minister Edouard Baladour announced on February 22 that the Superphenix fast reactor at Creys-Malville will be allowed to restart. Along with his industry minister, Gerard Longuet, and the environment minister, Michel Bamier, Baladour has accepted the recommendation for reissuance of an operating license submitted to the ministers in January by the nuclear installations safety directorate (DSIN). In announcing their approval for restart, the ministers emphasized that the reactor was to be used as a research and demonstration facility rather than a power station. In particular, they said it should be used to investigate the possibility of using fastmore » reactors as plutonium burners rather than breeders and for the incineration of other long-lived actinide wastes. This point was made also by DSIN Director Andre-Claude Lacoste in his recommendations, but appears to have been given more weight by the government ministers. The ministers also accepted the DSIN recommendation that restart be conditional on completion of improvements to fire protection systems for the secondary sodium coolant ducts. Baladour said that it would take several months to complete this work, but other sources have suggested that the reactor could be ready to operate this month. DSIN has also stipulated that the power level be limited for several months to around 50 percent of the plant`s 1200-MWe potential in order to check out all the systems carefully.« less

  14. 10 CFR 72.8 - Denial of licensing by Agreement States.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General... the storage of spent fuel and reactor-related GTCC waste in an ISFSI or the storage of spent fuel, high-level radioactive waste, and reactor-related GTCC waste in an MRS. [66 FR 51839, Oct. 11, 2001] ...

  15. 10 CFR 72.22 - Contents of application: General and financial information.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN... of spent fuel, high-level radioactive waste, and/or reactor-related GTCC waste from storage. (f) Each applicant for a license under this part to receive, transfer, and possess power reactor spent fuel, power...

  16. 10 CFR 52.141 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.141 Section 52.141 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...

  17. 10 CFR 52.87 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.87 Section 52.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS. The ACRS...

  18. 10 CFR 52.53 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.53 Section 52.53 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...

  19. 10 CFR 52.165 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.165 Section 52.165 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...

  20. 10 CFR 52.23 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.23 Section 52.23 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application for an early site...

  1. 10 CFR 52.165 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.165 Section 52.165 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...

  2. 10 CFR 52.23 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.23 Section 52.23 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application for an early site...

  3. 10 CFR 52.87 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.87 Section 52.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS. The ACRS...

  4. 10 CFR 52.141 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.141 Section 52.141 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...

  5. 10 CFR 2.809 - Participation by the Advisory Committee on Reactor Safeguards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Participation by the Advisory Committee on Reactor Safeguards. 2.809 Section 2.809 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Rulemaking § 2.809 Participation by the Advisory Committee on Reactor...

  6. 10 CFR 72.8 - Denial of licensing by Agreement States.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General... the storage of spent fuel and reactor-related GTCC waste in an ISFSI or the storage of spent fuel, high-level radioactive waste, and reactor-related GTCC waste in an MRS. [66 FR 51839, Oct. 11, 2001] ...

  7. 10 CFR 52.53 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.53 Section 52.53 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...

  8. 76 FR 77021 - Notice of Availability of Combined License Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... searching on Docket ID NRC-2008-0170 (William States Lee III Nuclear Station Units 1 and 2), NRC-2008-0231...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: (301) 415-1035...

  9. 76 FR 71608 - Notice of Availability of Combined License Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... searching on Docket ID NRC-2008-0170 (William States Lee III Nuclear Station Units 1 and 2), NRC-2008-0231...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: (301) 415-1035...

  10. 76 FR 75566 - Notice of Availability of Combined License Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ....regulations.gov by searching on Docket ID NRC-2008-0170 (William States Lee III Nuclear Station Units 1 and 2... available at http://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone...

  11. 76 FR 72725 - Notice of Availability of Combined License Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... searching on Docket ID NRC-2008-0170 (William States Lee III Nuclear Station Units 1 and 2), NRC-2008-0231...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: (301) 415-1035...

  12. 10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Technical specifications on effluents from nuclear power reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors...

  13. 10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Technical specifications on effluents from nuclear power reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors...

  14. 78 FR 63516 - Initial Test Program of Emergency Core Cooling Systems for New Boiling-Water Reactors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0134] Initial Test Program of Emergency Core Cooling....79.1, ``Initial Test Program of Emergency Core Cooling Systems for New Boiling-Water Reactors.'' This... emergency core cooling systems (ECCSs) for boiling- water reactors (BWRs) whose licenses are issued after...

  15. 10 CFR 50.44 - Combustible gas control for nuclear power reactors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Combustible gas control for nuclear power reactors. 50.44... FACILITIES Standards for Licenses, Certifications, and Regulatory Approvals § 50.44 Combustible gas control... capability for ensuring a mixed atmosphere. (2) Combustible gas control. (i) All boiling water reactors with...

  16. 10 CFR 50.44 - Combustible gas control for nuclear power reactors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Combustible gas control for nuclear power reactors. 50.44... FACILITIES Standards for Licenses, Certifications, and Regulatory Approvals § 50.44 Combustible gas control... capability for ensuring a mixed atmosphere. (2) Combustible gas control. (i) All boiling water reactors with...

  17. 10 CFR 50.44 - Combustible gas control for nuclear power reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Combustible gas control for nuclear power reactors. 50.44... FACILITIES Standards for Licenses, Certifications, and Regulatory Approvals § 50.44 Combustible gas control... capability for ensuring a mixed atmosphere. (2) Combustible gas control. (i) All boiling water reactors with...

  18. 10 CFR 2.340 - Initial decision in certain contested proceedings; immediate effectiveness of initial decisions...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... those matters, the Commission, the Director, Office of Nuclear Reactor Regulation or Director, Office of... Nuclear Reactor Regulation, as appropriate, after making the requisite findings, will issue, deny or... acceptance criteria in nuclear power reactor combined licenses. In any initial decision under § 52.103(g) of...

  19. 10 CFR 50.63 - Loss of all alternating current power.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... information defined below to the Director of the Office of Nuclear Reactor Regulation by April 17, 1989. For... Office of Nuclear Reactor Regulation, by 270 days after the date of license issuance. For each light... accordance with paragraph (c)(3) of this section, submit to the Director of the Office of Nuclear Reactor...

  20. 10 CFR 2.340 - Initial decision in certain contested proceedings; immediate effectiveness of initial decisions...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... those matters, the Commission, the Director, Office of Nuclear Reactor Regulation or Director, Office of... Nuclear Reactor Regulation, as appropriate, after making the requisite findings, will issue, deny or... acceptance criteria in nuclear power reactor combined licenses. In any initial decision under § 52.103(g) of...

  1. 10 CFR 50.63 - Loss of all alternating current power.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... information defined below to the Director of the Office of Nuclear Reactor Regulation by April 17, 1989. For... Office of Nuclear Reactor Regulation, by 270 days after the date of license issuance. For each light... accordance with paragraph (c)(3) of this section, submit to the Director of the Office of Nuclear Reactor...

  2. 10 CFR 50.63 - Loss of all alternating current power.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... information defined below to the Director of the Office of Nuclear Reactor Regulation by April 17, 1989. For... Office of Nuclear Reactor Regulation, by 270 days after the date of license issuance. For each light... accordance with paragraph (c)(3) of this section, submit to the Director of the Office of Nuclear Reactor...

  3. 10 CFR 2.340 - Initial decision in certain contested proceedings; immediate effectiveness of initial decisions...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... those matters, the Commission, the Director, Office of Nuclear Reactor Regulation or Director, Office of... Nuclear Reactor Regulation, as appropriate, after making the requisite findings, will issue, deny or... acceptance criteria in nuclear power reactor combined licenses. In any initial decision under § 52.103(g) of...

  4. 10 CFR 50.63 - Loss of all alternating current power.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... information defined below to the Director of the Office of Nuclear Reactor Regulation by April 17, 1989. For... Office of Nuclear Reactor Regulation, by 270 days after the date of license issuance. For each light... accordance with paragraph (c)(3) of this section, submit to the Director of the Office of Nuclear Reactor...

  5. 77 FR 21592 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... Regulatory Commission. Jessie F. Quichocho, Chief, Research and Test Reactors Licensing Branch, Division of... information in comment submissions that you do not want to be publicly disclosed. The NRC posts all comment...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Qualls, A. L.; Brown, Nicholas R.; Betzler, Benjamin R.

    The fluoride salt-cooled high-temperature reactor (FHR) demonstration reactor (DR) is a concept for a salt-cooled reactor with 100 megawatts of thermal output (MWt). It would use tristructural-isotropic (TRISO) particle fuel within prismatic graphite blocks. FLiBe (2 LiF-BeF 2) is the reference primary coolant. The FHR DR is designed to be small, simple, and affordable. Development of the FHR DR is a necessary intermediate step to enable near-term commercial FHRs. Lower risk technologies are purposely included in the initial FHR DR design to ensure that the reactor can be built, licensed, and operated within an acceptable budget and schedule. These technologiesmore » include TRISO particle fuel, replaceable core structural material, the use of that same material for the primary and intermediate loops, and tube-and-shell primary-to-intermediate heat exchangers. Several preconceptual and conceptual design efforts that have been conducted on FHR concepts bear a significant influence on the FHR DR design. Specific designs include the Oak Ridge National Laboratory (ORNL) advanced high-temperature reactor (AHTR) with 3400/1500 MWt/megawatts of electric output (MWe), as well as a 125 MWt small modular AHTR (SmAHTR) from ORNL. Other important examples are the Mk1 pebble bed FHR (PB-FHR) concept from the University of California, Berkeley (UCB), and an FHR test reactor design developed at the Massachusetts Institute of Technology (MIT). The MIT FHR test reactor is based on a prismatic fuel platform and is directly relevant to the present FHR DR design effort. These FHR concepts are based on reasonable assumptions for credible commercial prototypes. The FHR DR concept also directly benefits from the operating experience of the Molten Salt Reactor Experiment (MSRE), as well as the detailed design efforts for a large molten salt reactor concept and its breeder variant, the Molten Salt Breeder Reactor. The FHR DR technology is most representative of the 3400 MWt AHTR concept, and it will demonstrate key operational features of that design. The FHR DR will be closely scaled to the SmAHTR concept in power and flows, so any technologies demonstrated will be directly applicable to a reactor concept of that size. The FHR DR is not a commercial prototype design, but rather a DR that serves a cost and risk mitigation function for a later commercial prototype. It is expected to have a limited operational lifetime compared to a commercial plant. It is designed to be a low-cost reactor compared to more mature advanced prototype DRs. A primary reason to build the FHR DR is to learn about salt reactor technologies and demonstrate solutions to remaining technical gaps.« less

  7. Toward a Mechanistic Source Term in Advanced Reactors: Characterization of Radionuclide Transport and Retention in a Sodium Cooled Fast Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brunett, Acacia J.; Bucknor, Matthew; Grabaskas, David

    A vital component of the U.S. reactor licensing process is an integrated safety analysis in which a source term representing the release of radionuclides during normal operation and accident sequences is analyzed. Historically, source term analyses have utilized bounding, deterministic assumptions regarding radionuclide release. However, advancements in technical capabilities and the knowledge state have enabled the development of more realistic and best-estimate retention and release models such that a mechanistic source term assessment can be expected to be a required component of future licensing of advanced reactors. Recently, as part of a Regulatory Technology Development Plan effort for sodium cooledmore » fast reactors (SFRs), Argonne National Laboratory has investigated the current state of knowledge of potential source terms in an SFR via an extensive review of previous domestic experiments, accidents, and operation. As part of this work, the significant sources and transport processes of radionuclides in an SFR have been identified and characterized. This effort examines all stages of release and source term evolution, beginning with release from the fuel pin and ending with retention in containment. Radionuclide sources considered in this effort include releases originating both in-vessel (e.g. in-core fuel, primary sodium, cover gas cleanup system, etc.) and ex-vessel (e.g. spent fuel storage, handling, and movement). Releases resulting from a primary sodium fire are also considered as a potential source. For each release group, dominant transport phenomena are identified and qualitatively discussed. The key product of this effort was the development of concise, inclusive diagrams that illustrate the release and retention mechanisms at a high level, where unique schematics have been developed for in-vessel, ex-vessel and sodium fire releases. This review effort has also found that despite the substantial range of phenomena affecting radionuclide release, the current state of knowledge is extensive, and in most areas may be sufficient. Several knowledge gaps were identified, such as uncertainty in release from molten fuel and availability of thermodynamic data for lanthanides and actinides in liquid sodium. However, the overall findings suggest that high retention rates can be expected within the fuel and primary sodium for all radionuclides other than noble gases.« less

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grabaskas, David; Bucknor, Matthew; Jerden, James

    A mechanistic source term (MST) calculation attempts to realistically assess the transport and release of radionuclides from a reactor system to the environment during a specific accident sequence. The U.S. Nuclear Regulatory Commission (NRC) has repeatedly stated its expectation that advanced reactor vendors will utilize an MST during the U.S. reactor licensing process. As part of a project to examine possible impediments to sodium fast reactor (SFR) licensing in the U.S., an analysis was conducted regarding the current capabilities to perform an MST for a metal fuel SFR. The purpose of the project was to identify and prioritize any gapsmore » in current computational tools, and the associated database, for the accurate assessment of an MST. The results of the study demonstrate that an SFR MST is possible with current tools and data, but several gaps exist that may lead to possibly unacceptable levels of uncertainty, depending on the goals of the MST analysis.« less

  9. Health physics aspects of advanced reactor licensing reviews

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hinson, C.S.

    1995-03-01

    The last Construction Permit to be issued by the U.S. Nuclear Regulatory Commission (NRC) for a U.S. light water reactor (LWR) was granted in the late 1970s. In 1989 the NRC issued 10 CFR Part 52 which is intended to serve as a framework for the licensing of future reactor designs. The NRC is currently reviewing four different future on {open_quotes}next-generation{close_quotes} reactor designs. Two of these designs are classified as evolutionary designs (modified versions of current generation LWRs) and two are advanced designs (reactors incorporating simplified designs and passive means for accident mitigation). These {open_quotes}next-generation{close_quotes} reactor designs incorporate many innovativemore » design features which are intended to maintain personnel doses ALARA and ensure that the annual average collective dose at these reactors does not exceed 100 person-rems (1 person-sievert) per year. This paper discusses some of the ALARA design features which are incorporated in the four {open_quotes}next-generation{close_quotes} reactor designs incorporate many innovative design features which are intended to maintain personnel doses ALARA and ensure that the annual average collective dose at these reactors does not exceed 100 person-rems (1 person-sievert) per year. This paper discusses some of the ALARA design features which are incorporated in the four {open_quotes}next-generation{close_quotes} reactor designs currently being reviewed by the NRC.« less

  10. Testing of a Transport Cask for Research Reactor Spent Fuel - 13003

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mourao, Rogerio P.; Leite da Silva, Luiz; Miranda, Carlos A.

    2013-07-01

    Since the beginning of the last decade three Latin American countries that operate research reactors - Argentina, Brazil and Chile - have been joining efforts to improve the regional capability in the management of spent fuel elements from the TRIGA and MTR reactors operated in the region. A main drive in this initiative, sponsored by the International Atomic Energy Agency, is the fact that no definite solution regarding the back end of the research reactor fuel cycle has been taken by any of the participating country. However, any long-term solution - either disposition in a repository or storage away frommore » reactor - will involve at some stage the transportation of the spent fuel through public roads. Therefore, a licensed cask that provides adequate shielding, assurance of subcriticality, and conformance to internationally accepted safety, security and safeguards regimes is considered a strategic part of any future solution to be adopted at a regional level. As a step in this direction, a packaging for the transport of irradiated fuel for MTR and TRIGA research reactors was designed by the tri-national team and a half-scale model equipped with the MTR version of the internal basket was constructed in Argentina and Brazil and tested in Brazil. Three test campaigns have been carried out so far, covering both normal conditions of transportation and hypothetical accident conditions. After failing the tests in the first two test series, the specimen successfully underwent the last test sequence. A second specimen, incorporating the structural improvements in view of the previous tests results, will be tested in the near future. Numerical simulations of the free drop and thermal tests are being carried out in parallel, in order to validate the computational modeling that is going to be used as a support for the package certification. (authors)« less

  11. Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oostrom, Martinus; Vail, Lance W.

    Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company’s application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units—Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction andmore » operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.« less

  12. 10 CFR 72.214 - List of approved spent fuel storage casks.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.214 List of approved spent...

  13. 10 CFR 72.214 - List of approved spent fuel storage casks.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.214 List of approved spent...

  14. 10 CFR 51.121 - Status of NEPA actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... address inquiries to: (a) Utilization facilities: ATTN: Document Control Desk, Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND...

  15. 10 CFR 51.121 - Status of NEPA actions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... address inquiries to: (a) Utilization facilities: ATTN: Document Control Desk, Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND...

  16. 10 CFR 51.121 - Status of NEPA actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... address inquiries to: (a) Utilization facilities: ATTN: Document Control Desk, Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND...

  17. High Temperature Gas-Cooled Test Reactor Point Design: Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sterbentz, James William; Bayless, Paul David; Nelson, Lee Orville

    2016-01-01

    A point design has been developed for a 200-MW high-temperature gas-cooled test reactor. The point design concept uses standard prismatic blocks and 15.5% enriched uranium oxycarbide fuel. Reactor physics and thermal-hydraulics simulations have been performed to characterize the capabilities of the design. In addition to the technical data, overviews are provided on the technology readiness level, licensing approach, and costs of the test reactor point design.

  18. High Temperature Gas-Cooled Test Reactor Point Design: Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sterbentz, James William; Bayless, Paul David; Nelson, Lee Orville

    2016-03-01

    A point design has been developed for a 200-MW high-temperature gas-cooled test reactor. The point design concept uses standard prismatic blocks and 15.5% enriched uranium oxycarbide fuel. Reactor physics and thermal-hydraulics simulations have been performed to characterize the capabilities of the design. In addition to the technical data, overviews are provided on the technology readiness level, licensing approach, and costs of the test reactor point design.

  19. 10 CFR 72.18 - Elimination of repetition.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Elimination of repetition. 72.18 Section 72.18 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License...

  20. 10 CFR 72.18 - Elimination of repetition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Elimination of repetition. 72.18 Section 72.18 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License...

  1. 10 CFR 72.34 - Environmental report.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report. 72.34 Section 72.34 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License Application, Form...

  2. 10 CFR 52.151 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... applicable to Commission issuance of a license authorizing manufacture of nuclear power reactors to be... 10 Energy 2 2010-01-01 2010-01-01 false Scope of subpart. 52.151 Section 52.151 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...

  3. 10 CFR 2.105 - Notice of proposed action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedure for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval Hearing... within the time prescribed in the notice, the Director, Office of Nuclear Reactor Regulation, Director...

  4. 10 CFR 2.105 - Notice of proposed action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedure for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval Hearing... within the time prescribed in the notice, the Director, Office of Nuclear Reactor Regulation, Director...

  5. 10 CFR 55.51 - Issuance of licenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Issuance of licenses. 55.51 Section 55.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Licenses § 55.51 Issuance of licenses. Operator and senior operator licenses. If the Commission determines that an applicant for an operator license or a...

  6. Reactor safeguards system assessment and design. Volume I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Varnado, G.B.; Ericson, D.M. Jr.; Daniel, S.L.

    1978-06-01

    This report describes the development and application of a methodology for evaluating the effectiveness of nuclear power reactor safeguards systems. Analytic techniques are used to identify the sabotage acts which could lead to release of radioactive material from a nuclear power plant, to determine the areas of a plant which must be protected to assure that significant release does not occur, to model the physical plant layout, and to evaluate the effectiveness of various safeguards systems. The methodology was used to identify those aspects of reactor safeguards systems which have the greatest effect on overall system performance and which, therefore,more » should be emphasized in the licensing process. With further refinements, the methodology can be used by the licensing reviewer to aid in assessing proposed or existing safeguards systems.« less

  7. A summary of the results from the DOE advanced gas reactor (AGR) fuel development and qualification program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petti, David Andrew

    2017-04-01

    Modular high temperature gas-cooled reactor (HTGR) designs were developed to provide natural safety, which prevents core damage under all licensing basis events. The principle that guides their design concepts is to passively maintain core temperatures below fission product release thresholds under all accident scenarios. The required level of fuel performance and fission product retention reduces the radioactive source term by many orders of magnitude relative to source terms for other reactor types and allows a graded approach to emergency planning and the potential elimination of the need for evacuation and sheltering beyond a small exclusion area. Achieving this level, however,more » is predicated on exceptionally high coated-particle fuel fabrication quality and excellent performance under normal operation and accident conditions. The design goal of modular HTGRs is to meet the Environmental Protection Agency (EPA) Protective Action Guides (PAGs) for offsite dose at the Exclusion Area Boundary (EAB). To achieve this, the reactor design concepts require a level of fuel integrity that is far better than that achieved for all prior U.S.-manufactured tristructural isotropic (TRISO) coated particle fuel.« less

  8. AGC 2 Irradiated Material Properties Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rohrbaugh, David Thomas

    2017-05-01

    The Advanced Reactor Technologies Graphite Research and Development Program is conducting an extensive graphite irradiation experiment to provide data for licensing of a high temperature reactor (HTR) design. In past applications, graphite has been used effectively as a structural and moderator material in both research and commercial high temperature gas cooled reactor designs. , Nuclear graphite H 451, used previously in the United States for nuclear reactor graphite components, is no longer available. New nuclear graphite grades have been developed and are considered suitable candidates for new HTR reactor designs. To support the design and licensing of HTR core componentsmore » within a commercial reactor, a complete properties database must be developed for these current grades of graphite. Quantitative data on in service material performance are required for the physical, mechanical, and thermal properties of each graphite grade, with a specific emphasis on data accounting for the life limiting effects of irradiation creep on key physical properties of the HTR candidate graphite grades. Further details on the research and development activities and associated rationale required to qualify nuclear grade graphite for use within the HTR are documented in the graphite technology research and development plan.« less

  9. AGC 2 Irradiation Creep Strain Data Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Windes, William E.; Rohrbaugh, David T.; Swank, W. David

    2016-08-01

    The Advanced Reactor Technologies Graphite Research and Development Program is conducting an extensive graphite irradiation experiment to provide data for licensing of a high temperature reactor (HTR) design. In past applications, graphite has been used effectively as a structural and moderator material in both research and commercial high temperature gas cooled reactor designs. Nuclear graphite H-451, used previously in the United States for nuclear reactor graphite components, is no longer available. New nuclear graphite grades have been developed and are considered suitable candidates for new HTR reactor designs. To support the design and licensing of HTR core components within amore » commercial reactor, a complete properties database must be developed for these current grades of graphite. Quantitative data on in service material performance are required for the physical, mechanical, and thermal properties of each graphite grade, with a specific emphasis on data accounting for the life limiting effects of irradiation creep on key physical properties of the HTR candidate graphite grades. Further details on the research and development activities and associated rationale required to qualify nuclear grade graphite for use within the HTR are documented in the graphite technology research and development plan.« less

  10. Computer Based Procedures for Field Workers - FY16 Research Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oxstrand, Johanna; Bly, Aaron

    The Computer-Based Procedure (CBP) research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. One area that could yield tremendous savings in increased efficiency and safety is in improving procedure use. A CBP provides the opportunity to incorporate context-driven jobmore » aids, such as drawings, photos, and just-in-time training. The presentation of information in CBPs can be much more flexible and tailored to the task, actual plant condition, and operation mode. The dynamic presentation of the procedure will guide the user down the path of relevant steps, thus minimizing time spent by the field worker to evaluate plant conditions and decisions related to the applicability of each step. This dynamic presentation of the procedure also minimizes the risk of conducting steps out of order and/or incorrectly assessed applicability of steps. This report provides a summary of the main research activities conducted in the Computer-Based Procedures for Field Workers effort since 2012. The main focus of the report is on the research activities conducted in fiscal year 2016. The activities discussed are the Nuclear Electronic Work Packages – Enterprise Requirements initiative, the development of a design guidance for CBPs (which compiles all insights gained through the years of CBP research), the facilitation of vendor studies at the Idaho National Laboratory (INL) Advanced Test Reactor (ATR), a pilot study for how to enhance the plant design modification work process, the collection of feedback from a field evaluation study at Plant Vogtle, and path forward to commercialize INL’s CBP system.« less

  11. DOE`s annealing prototype demonstration projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warren, J.; Nakos, J.; Rochau, G.

    1997-02-01

    One of the challenges U.S. utilities face in addressing technical issues associated with the aging of nuclear power plants is the long-term effect of plant operation on reactor pressure vessels (RPVs). As a nuclear plant operates, its RPV is exposed to neutrons. For certain plants, this neutron exposure can cause embrittlement of some of the RPV welds which can shorten the useful life of the RPV. This RPV embrittlement issue has the potential to affect the continued operation of a number of operating U.S. pressurized water reactor (PWR) plants. However, RPV material properties affected by long-term irradiation are recoverable throughmore » a thermal annealing treatment of the RPV. Although a dozen Russian-designed RPVs and several U.S. military vessels have been successfully annealed, U.S. utilities have stated that a successful annealing demonstration of a U.S. RPV is a prerequisite for annealing a licensed U.S. nuclear power plant. In May 1995, the Department of Energy`s Sandia National Laboratories awarded two cost-shared contracts to evaluate the feasibility of annealing U.S. licensed plants by conducting an anneal of an installed RPV using two different heating technologies. The contracts were awarded to the American Society of Mechanical Engineers (ASME) Center for Research and Technology Development (CRTD) and MPR Associates (MPR). The ASME team completed its annealing prototype demonstration in July 1996, using an indirect gas furnace at the uncompleted Public Service of Indiana`s Marble Hill nuclear power plant. The MPR team`s annealing prototype demonstration was scheduled to be completed in early 1997, using a direct heat electrical furnace at the uncompleted Consumers Power Company`s nuclear power plant at Midland, Michigan. This paper describes the Department`s annealing prototype demonstration goals and objectives; the tasks, deliverables, and results to date for each annealing prototype demonstration; and the remaining annealing technology challenges.« less

  12. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol.more » 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.« less

  13. Dismantling of the 904 Cell at the HAO/Sud Facility - 13466

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vaudey, C.E.; Crosnier, S.; Renouf, M.

    2013-07-01

    La Hague facility, in France, is the spent fuel recycling plant wherein a part of the fuel coming from some of the French, German, Belgian, Swiss, Dutch and Japanese nuclear reactors is reprocessed before being recycled in order to separate certain radioactive elements. The facility has been successively handled by the CEA (1962-1978), Cogema (1978-2006), and AREVA NC (since 2006). La Hague facility is composed of 3 production units: The UP2-400 production unit started to be operated in 1966 for the reprocessing of UNGG metal fuel. In 1976, following the dropout of the graphite-gas technology by EDF, an HAO workshopmore » to reprocess the fuel from the light water reactors is affiliated and then stopped in 2003. - UP2-400 is partially stopped in 2002 and then definitely the 1 January 2004 and is being dismantled - UP2-800, with the same capacity than UP3, started to be operated in 1994 and is still in operation. And UP3 - UP3 was implemented in 1990 with an annual reprocessing capacity of 800 tons of fuel and is still in operation The combined licensed capacity of UP2-800 and UP3 is 1,700 tons of used fuel. (authors)« less

  14. Verification and Validation Strategy for LWRS Tools

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carl M. Stoots; Richard R. Schultz; Hans D. Gougar

    2012-09-01

    One intension of the Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program is to create advanced computational tools for safety assessment that enable more accurate representation of a nuclear power plant safety margin. These tools are to be used to study the unique issues posed by lifetime extension and relicensing of the existing operating fleet of nuclear power plants well beyond their first license extension period. The extent to which new computational models / codes such as RELAP-7 can be used for reactor licensing / relicensing activities depends mainly upon the thoroughness with which they have been verifiedmore » and validated (V&V). This document outlines the LWRS program strategy by which RELAP-7 code V&V planning is to be accomplished. From the perspective of developing and applying thermal-hydraulic and reactivity-specific models to reactor systems, the US Nuclear Regulatory Commission (NRC) Regulatory Guide 1.203 gives key guidance to numeric model developers and those tasked with the validation of numeric models. By creating Regulatory Guide 1.203 the NRC defined a framework for development, assessment, and approval of transient and accident analysis methods. As a result, this methodology is very relevant and is recommended as the path forward for RELAP-7 V&V. However, the unique issues posed by lifetime extension will require considerations in addition to those addressed in Regulatory Guide 1.203. Some of these include prioritization of which plants / designs should be studied first, coupling modern supporting experiments to the stringent needs of new high fidelity models / codes, and scaling of aging effects.« less

  15. 10 CFR 72.20 - Public inspection of application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Public inspection of application. 72.20 Section 72.20 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License...

  16. 10 CFR 72.20 - Public inspection of application.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Public inspection of application. 72.20 Section 72.20 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License...

  17. 10 CFR 2.310 - Selection of hearing procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., licensee-initiated amendment, or termination of licenses or permits for nuclear power reactors, where the... of a civilian nuclear power plant must be conducted under the procedures of subpart L of this part... Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF...

  18. 10 CFR 52.153 - Relationship to other subparts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Relationship to other subparts. 52.153 Section 52.153 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Manufacturing Licenses § 52.153 Relationship to other subparts. (a) A nuclear power reactor...

  19. 10 CFR 52.153 - Relationship to other subparts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Relationship to other subparts. 52.153 Section 52.153 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Manufacturing Licenses § 52.153 Relationship to other subparts. (a) A nuclear power reactor...

  20. 77 FR 13376 - Notice of License Termination for the University of Arizona Research Reactor, License No. R-52

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ..., alpha plus beta measurements, smear sampling, and soil sampling activities. As a result of the...-Agency Radiation Survey and Site Investigation Manual.'' The U of AZ submitted a revised FSS Plan on... and that the [[Page 13377

  1. 10 CFR 50.10 - License required; limited work authorization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...

  2. 10 CFR 50.10 - License required; limited work authorization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...

  3. 10 CFR 50.10 - License required; limited work authorization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...

  4. 10 CFR 50.10 - License required; limited work authorization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...

  5. Fuel cycle cost, reactor physics and fuel manufacturing considerations for Erbia-bearing PWR fuel with > 5 wt% U-235 content

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Franceschini, F.; Lahoda, E. J.; Kucukboyaci, V. N.

    2012-07-01

    The efforts to reduce fuel cycle cost have driven LWR fuel close to the licensed limit in fuel fissile content, 5.0 wt% U-235 enrichment, and the acceptable duty on current Zr-based cladding. An increase in the fuel enrichment beyond the 5 wt% limit, while certainly possible, entails costly investment in infrastructure and licensing. As a possible way to offset some of these costs, the addition of small amounts of Erbia to the UO{sub 2} powder with >5 wt% U-235 has been proposed, so that its initial reactivity is reduced to that of licensed fuel and most modifications to the existingmore » facilities and equipment could be avoided. This paper discusses the potentialities of such a fuel on the US market from a vendor's perspective. An analysis of the in-core behavior and fuel cycle performance of a typical 4-loop PWR with 18 and 24-month operating cycles has been conducted, with the aim of quantifying the potential economic advantage and other operational benefits of this concept. Subsequently, the implications on fuel manufacturing and storage are discussed. While this concept has certainly good potential, a compelling case for its short-term introduction as PWR fuel for the US market could not be determined. (authors)« less

  6. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are twelve types of commercial radio operator licenses, certificates and permits (licenses). The... Radiotelephone Operator License (radiotelephone operator's general certificate). (6) Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (7) Restricted Radiotelephone Operator Permit (radiotelephone...

  7. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are twelve types of commercial radio operator licenses, certificates and permits (licenses). The... Radiotelephone Operator License (radiotelephone operator's general certificate). (6) Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (7) Restricted Radiotelephone Operator Permit (radiotelephone...

  8. 78 FR 24441 - Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Evolutionary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... Reactor (U.S. EPR) will hold a meeting on May 8-9, 2013, Room T-2B1, 11545 Rockville Pike, Rockville... License Application (COLA) associated with the U.S. EPR Design Control Document (DCD). The Subcommittee...

  9. 10 CFR 52.131 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Standard... review, and referral to the Advisory Committee on Reactor Safeguards of standard designs for a nuclear power reactor of the type described in § 50.22 of this chapter or major portions thereof. ...

  10. 10 CFR 52.75 - Filing of applications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) The application... 10 Energy 2 2014-01-01 2014-01-01 false Filing of applications. 52.75 Section 52.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined...

  11. 10 CFR 2.102 - Administrative review of application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... completion of its review. (b) The Director, Office of Nuclear Reactor Regulation, Director, Office of New... as requested by the Commission. (c) The Director, Office of Nuclear Reactor Regulation, Director... Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF...

  12. 10 CFR 52.75 - Filing of applications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) The application... 10 Energy 2 2011-01-01 2011-01-01 false Filing of applications. 52.75 Section 52.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined...

  13. 10 CFR 52.75 - Filing of applications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) The application... 10 Energy 2 2012-01-01 2012-01-01 false Filing of applications. 52.75 Section 52.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined...

  14. 10 CFR 2.102 - Administrative review of application.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... completion of its review. (b) The Director, Office of Nuclear Reactor Regulation, Director, Office of New... as requested by the Commission. (c) The Director, Office of Nuclear Reactor Regulation, Director... Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF...

  15. 10 CFR 52.75 - Filing of applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) The application... 10 Energy 2 2010-01-01 2010-01-01 false Filing of applications. 52.75 Section 52.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined...

  16. 10 CFR 52.75 - Filing of applications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) The application... 10 Energy 2 2013-01-01 2013-01-01 false Filing of applications. 52.75 Section 52.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined...

  17. 10 CFR 72.62 - Backfitting.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Backfitting. 72.62 Section 72.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Issuance and Conditions of License § 72.62...

  18. 10 CFR 72.216 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false [Reserved] 72.216 Section 72.216 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at...

  19. 10 CFR 2.502-2.504 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] 2.502-2.504 Section 2.502-2.504 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional Procedures Applicable to Proceedings for the Issuance of Licenses To Manufacture Nuclear Power Reactors To Be...

  20. 10 CFR 50.76 - Licensee's change of status; financial qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... license) for a nuclear power reactor, no later than seventy-five (75) days prior to ceasing to be an... 10 Energy 1 2010-01-01 2010-01-01 false Licensee's change of status; financial qualifications. 50.76 Section 50.76 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...

  1. High-Temperature Gas-Cooled Test Reactor Point Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sterbentz, James William; Bayless, Paul David; Nelson, Lee Orville

    2016-04-01

    A point design has been developed for a 200 MW high-temperature gas-cooled test reactor. The point design concept uses standard prismatic blocks and 15.5% enriched UCO fuel. Reactor physics and thermal-hydraulics simulations have been performed to characterize the capabilities of the design. In addition to the technical data, overviews are provided on the technological readiness level, licensing approach and costs.

  2. Conversion Preliminary Safety Analysis Report for the NIST Research Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Diamond, D. J.; Baek, J. S.; Hanson, A. L.

    The NIST Center for Neutron Research (NCNR) is a reactor-laboratory complex providing the National Institute of Standards and Technology (NIST) and the nation with a world-class facility for the performance of neutron-based research. The heart of this facility is the NIST research reactor (aka NBSR); a heavy water moderated and cooled reactor operating at 20 MW. It is fueled with high-enriched uranium (HEU) fuel elements. A Global Threat Reduction Initiative (GTRI) program is underway to convert the reactor to low-enriched uranium (LEU) fuel. This program includes the qualification of the proposed fuel, uranium and molybdenum alloy foil clad in anmore » aluminum alloy, and the development of the fabrication techniques. This report is a preliminary version of the Safety Analysis Report (SAR) that would be submitted to the U.S. Nuclear Regulatory Commission (NRC) for approval prior to conversion. The report follows the recommended format and content from the NRC codified in NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-power Reactors,” Chapter 18, “Highly Enriched to Low-Enriched Uranium Conversions.” The emphasis in any conversion SAR is to explain the differences between the LEU and HEU cores and to show the acceptability of the new design; there is no need to repeat information regarding the current reactor that will not change upon conversion. Hence, as seen in the report, the bulk of the SAR is devoted to Chapter 4, Reactor Description, and Chapter 13, Safety Analysis.« less

  3. Light Water Reactor Sustainability Program: Risk-Informed Safety Margins Characterization (RISMC) Pathway Technical Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Curtis; Rabiti, Cristian; Martineau, Richard

    Safety is central to the design, licensing, operation, and economics of Nuclear Power Plants (NPPs). As the current Light Water Reactor (LWR) NPPs age beyond 60 years, there are possibilities for increased frequency of Systems, Structures, and Components (SSCs) degradations or failures that initiate safety-significant events, reduce existing accident mitigation capabilities, or create new failure modes. Plant designers commonly “over-design” portions of NPPs and provide robustness in the form of redundant and diverse engineered safety features to ensure that, even in the case of well-beyond design basis scenarios, public health and safety will be protected with a very high degreemore » of assurance. This form of defense-in-depth is a reasoned response to uncertainties and is often referred to generically as “safety margin.” Historically, specific safety margin provisions have been formulated, primarily based on “engineering judgment.”« less

  4. 10 CFR 2.107 - Withdrawal of application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear... 10 Energy 1 2011-01-01 2011-01-01 false Withdrawal of application. 2.107 Section 2.107 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS...

  5. 10 CFR 2.107 - Withdrawal of application.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear... 10 Energy 1 2012-01-01 2012-01-01 false Withdrawal of application. 2.107 Section 2.107 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS...

  6. High-temperature gas-cooled reactor technology development program. Annual progress report for period ending December 31, 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kasten, P.R.; Rittenhouse, P.L.; Bartine, D.E.

    1983-06-01

    During 1982 the High-Temperature Gas-Cooled Reactor (HTGR) Technology Program at Oak Ridge National Laboratory (ORNL) continued to develop experimental data required for the design and licensing of cogeneration HTGRs. The program involves fuels and materials development (including metals, graphite, ceramic, and concrete materials), HTGR chemistry studies, structural component development and testing, reactor physics and shielding studies, performance testing of the reactor core support structure, and HTGR application and evaluation studies.

  7. Some Implications of the Three Mile Island Accident for LMFBR Safety and Licensing: The Design Basis Issue

    DTIC Science & Technology

    1980-08-01

    metal fast breeder reactor (LMFBR) design. It also re-examines the impact of the accident at Three Mile Island on the design basis concept, and how...Water Reactors : ImpZications for Liquid MetaZ Fast Breeder Reactors , by W. E. Kastenberg and K. A. Solomon, July 1979. v SUNMARY The 1979 accident...the liquid metal fast breeder reactor (LMFBR). This Note assesses the impact of the TMI-2 accident on the LMFBR. Specifically, it: o Reviews the

  8. Annual Report to Congress of the Atomic Energy Commission for 1965

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seaborg, Glenn T.

    1966-01-31

    The document represents the 1965 Annual Report of the Atomic Energy Commission (AEC) to Congress. The report opens with a Foreword - a letter from President Lyndon B. Johnson. The main portion is divided into 3 major sections for 1965, plus 10 appendices and the index. Section names and chapters are as follows. Part One reports on Developmental and Promotional Activities with the following chapters: (1) The Atomic Energy Program - 1965; (2) The Industrial Base ; (3) Industrial Relations; (4) Operational Safety; (5) Source and Special Nuclear Materials Production; (6) The Nuclear Defense Effort; (7) Civilian Nuclear Power; (8)more » Nuclear Space Applications; (9) Auxiliary Electrical Power for Land and Sea; (10) Military Reactors; (11) Advanced Reactor Technology and Nuclear Safety Research; (12) The Plowshare Program; (13) Isotopes and Radiation Development; (14) Facilities and Projects for Basic Research; (15) International Cooperation; and, (16) Nuclear Education and Information. Part Two reports on Regulatory Activities with the following chapters: (1) Licensing and Regulating the Atom; (2) Reactors and other Nuclear Facilities; and, (3) Control of Radioactive Materials. Part Three reports on Adjudicatory Activities.« less

  9. 47 CFR 87.87 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Classification of operator licenses and... § 87.87 Classification of operator licenses and endorsements. (a) Commercial radio operator licenses... Telecommunication Union. (b) The following licenses are issued by the Commission. International classification, if...

  10. 78 FR 24438 - Evaluations of Explosions Postulated To Occur at Nearby Facilities and on Transportation Routes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... Nearby Facilities and on Transportation Routes Near Nuclear Power Plants AGENCY: Nuclear Regulatory... Nearby Facilities and on Transportation Routes Near Nuclear Power Plants.'' This regulatory guide describes for applicants seeking nuclear power reactor licenses and licensees of nuclear power reactors...

  11. 76 FR 14747 - Revision of Fee Schedules; Fee Recovery for Fiscal Year 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... Standards VI. Environmental Impact: Categorical Exclusion VII. Paperwork Reduction Act Statement VIII... nuclear reactors. The NRC has prepared a paper for the Commission's information in support of the Nuclear Energy Institute's position to calculate annual fees for each new licensed power reactor as a function of...

  12. 10 CFR 52.35 - Use of site for other purposes.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate, (Director) of... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... informs the Director that the holder no longer intends to use the site for a nuclear power plant, the...

  13. 10 CFR 2.318 - Commencement and termination of jurisdiction of presiding officer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., whichever is earliest. (b) The Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or the Director, Office of Nuclear Material Safety and Safeguards, as appropriate, may issue an... officer. 2.318 Section 2.318 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  14. 10 CFR 2.318 - Commencement and termination of jurisdiction of presiding officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., whichever is earliest. (b) The Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or the Director, Office of Nuclear Material Safety and Safeguards, as appropriate, may issue an... officer. 2.318 Section 2.318 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  15. 10 CFR 52.15 - Filing of applications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... permit with the Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation... 10 Energy 2 2012-01-01 2012-01-01 false Filing of applications. 52.15 Section 52.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site...

  16. 10 CFR 52.35 - Use of site for other purposes.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate, (Director) of... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... informs the Director that the holder no longer intends to use the site for a nuclear power plant, the...

  17. 10 CFR 52.35 - Use of site for other purposes.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate, (Director) of... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... informs the Director that the holder no longer intends to use the site for a nuclear power plant, the...

  18. 10 CFR 52.35 - Use of site for other purposes.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate, (Director) of... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... informs the Director that the holder no longer intends to use the site for a nuclear power plant, the...

  19. 10 CFR 52.35 - Use of site for other purposes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate, (Director) of... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... informs the Director that the holder no longer intends to use the site for a nuclear power plant, the...

  20. 10 CFR 52.15 - Filing of applications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... permit with the Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation... 10 Energy 2 2011-01-01 2011-01-01 false Filing of applications. 52.15 Section 52.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site...

  1. 10 CFR 52.15 - Filing of applications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... permit with the Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation... 10 Energy 2 2013-01-01 2013-01-01 false Filing of applications. 52.15 Section 52.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site...

  2. 10 CFR 52.15 - Filing of applications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... permit with the Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation... 10 Energy 2 2014-01-01 2014-01-01 false Filing of applications. 52.15 Section 52.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site...

  3. 10 CFR 52.15 - Filing of applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... permit with the Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation... 10 Energy 2 2010-01-01 2010-01-01 false Filing of applications. 52.15 Section 52.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site...

  4. 10 CFR 2.318 - Commencement and termination of jurisdiction of presiding officer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., whichever is earliest. (b) The Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or the Director, Office of Nuclear Material Safety and Safeguards, as appropriate, may issue an... officer. 2.318 Section 2.318 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  5. 78 FR 33120 - Final Interim Staff Guidance LR-ISG-2011-04; Updated Aging Management Criteria for Reactor Vessel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ..., ``Generic Aging Lessons Learned Report'' (GALL Report), for the aging management of Pressurized Water... communicate insights and lessons learned and to address emergent issues not covered in license renewal... ensure that PWR license renewal applicants will adequately address age-related degradation and aging...

  6. 31 CFR 500.584 - Energy sector projects in North Korea.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Energy sector projects in North Korea... Licenses, Authorizations and Statements of Licensing Policy § 500.584 Energy sector projects in North Korea... energy sector projects in North Korea in connection with that country's transition to light-water reactor...

  7. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... endorsements. 13.7 Section 13.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.7 Classification of operator licenses and endorsements. (a) Commercial radio operator... are eleven types of commercial radio operator licenses, certificates and permits (licenses). The...

  8. AGR-1 Compact 1-3-1 Post-Irradiation Examination Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Demkowicz, Paul Andrew

    The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established to perform the requisite research and development on tristructural isotropic (TRISO) coated particle fuel to support deployment of a high-temperature gas-cooled reactor (HTGR). The work continues as part of the Advanced Reactor Technologies (ART) TRISO Fuel program. The overarching program goal is to provide a baseline fuel qualification data set to support licensing and operation of an HTGR. To achieve these goals, the program includes the elements of fuel fabrication, irradiation, post-irradiation examination (PIE) and safety testing, fuel performance modeling, and fission product transport (INL 2015). A seriesmore » of fuel irradiation experiments is being planned and conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). These experiments will provide data on fuel performance under irradiation, support fuel process development, qualify the fuel for normal operating conditions, provide irradiated fuel for safety testing, and support the development of fuel performance and fission product transport models. The first of these irradiation tests, designated AGR-1, began in the ATR in December 2006 and ended in November 2009. This experiment was conducted primarily to act as a shakedown test of the multicapsule test train design and provide early data on fuel performance for use in fuel fabrication process development. It also provided samples for post-irradiation safety testing, where fission product retention of the fuel at high temperatures will be experimentally measured. The capsule design and details of the AGR-1 experiment have been presented previously (Grover, Petti, and Maki 2010, Maki 2009).« less

  9. AGR-1 Compact 5-3-1 Post-Irradiation Examination Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Demkowicz, Paul; Harp, Jason; Winston, Phil

    The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established to perform the requisite research and development on tristructural isotropic (TRISO) coated particle fuel to support deployment of a high-temperature gas-cooled reactor (HTGR). The work continues as part of the Advanced Reactor Technologies (ART) TRISO Fuel program. The overarching program goal is to provide a baseline fuel qualification data set to support licensing and operation of an HTGR. To achieve these goals, the program includes the elements of fuel fabrication, irradiation, post-irradiation examination (PIE) and safety testing, fuel performance, and fission product transport (INL 2015). A series ofmore » fuel irradiation experiments is being planned and conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). These experiments will provide data on fuel performance under irradiation, support fuel process development, qualify the fuel for normal operating conditions, provide irradiated fuel for safety testing, and support the development of fuel performance and fission product transport models. The first of these irradiation tests, designated AGR-1, began in the ATR in December 2006 and ended in November 2009. This experiment was conducted primarily to act as a shakedown test of the multicapsule test train design and provide early data on fuel performance for use in fuel fabrication process development. It also provided samples for post-irradiation safety testing, where fission product retention of the fuel at high temperatures will be experimentally measured. The capsule design and details of the AGR-1 experiment have been presented previously.« less

  10. Radiation Damage In Reactor Cavity Concrete

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Field, Kevin G; Le Pape, Yann; Naus, Dan J

    License renewal up to 60 years and the possibility of subsequent license renewal to 80 years has established a renewed focus on long-term aging of nuclear generating stations materials, and recently, on concrete. Large irreplaceable sections of most nuclear generating stations include concrete. The Expanded Materials Degradation Analysis (EMDA), jointly performed by the Department of Energy, the Nuclear Regulatory Commission and Industry, identified the urgent need to develop a consistent knowledge base on irradiation effects in concrete. Much of the historical mechanical performance data of irradiated concrete does not accurately reflect typical radiation conditions in NPPs or conditions out tomore » 60 or 80 years of radiation exposure. To address these potential gaps in the knowledge base, The Electric Power Research Institute and Oak Ridge National Laboratory are working to disposition radiation damage as a degradation mechanism. This paper outlines the research program within this pathway including: (i) defining the upper bound of the neutron and gamma dose levels expected in the biological shield concrete for extended operation (80 years of operation and beyond), (ii) determining the effects of neutron and gamma irradiation as well as extended time at temperature on concrete, (iii) evaluating opportunities to irradiate prototypical concrete under accelerated neutron and gamma dose levels to establish a conservative bound and share data obtained from different flux, temperature, and fluence levels, (iv) evaluating opportunities to harvest and test irradiated concrete from international NPPs, (v) developing cooperative test programs to improve confidence in the results from the various concretes and research reactors, (vi) furthering the understanding of the effects of radiation on concrete (see companion paper) and (vii) establishing an international collaborative research and information exchange effort to leverage capabilities and knowledge.« less

  11. Baseline Concept Description of a Small Modular High Temperature Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hans Gougar

    2014-05-01

    The objective of this report is to provide a description of generic small modular high temperature reactors (herein denoted as an smHTR), summarize their distinguishing attributes, and lay out the research and development (R&D) required for commercialization. The generic concepts rely heavily on the modular high temperature gas-cooled reactor designs developed in the 1980s which were never built but for which pre-licensing or certification activities were conducted. The concept matured more recently under the Next Generation Nuclear Plant (NGNP) project, specifically in the areas of fuel and material qualification, methods development, and licensing. As all vendor-specific designs proposed under NGNPmore » were all both ‘small’ or medium-sized and ‘modular’ by International Atomic Energy Agency (IAEA) and Department of Energy (DOE) standards, the technical attributes, challenges, and R&D needs identified, addressed, and documented under NGNP are valid and appropriate in the context of Small Modular Reactor (SMR) applications. Although the term High Temperature Reactor (HTR) is commonly used to denote graphite-moderated, thermal spectrum reactors with coolant temperatures in excess of 650oC at the core outlet, in this report the historical term High Temperature Gas-Cooled Reactor (HTGR) will be used to distinguish the gas-cooled technology described herein from its liquid salt-cooled cousin. Moreover, in this report it is to be understood that the outlet temperature of the helium in an HTGR has an upper limit of 950 degrees C which corresponds to the temperature to which certain alloys are currently being qualified under DOE’s ARC program. Although similar to the HTGR in just about every respect, the Very High Temperature Reactor (VHTR) may have an outlet temperature in excess of 950 degrees C and is therefore farther from commercialization because of the challenges posed to materials exposed to these temperatures. The VHTR is the focus of R&D under the Generation IV program and its specific R&D needs will be included in this report when appropriate for comparison. The distinguishing features of the HTGR are the refractory (TRISO) coated particle fuel, the low-power density, graphite-moderated core, and the high outlet temperature of the inert helium coolant. The low power density and fuel form effectively eliminate the possibility of core melt, even upon a complete loss of coolant pressure and flow. The graphite, which constitutes the bulk of the core volume and mass, provides a large thermal buffer that absorbs fission heat such that thermal transients occur over a timespan of hours or even days. As chemically-inert helium is already a gas, there is no coolant temperature or void feedback on the neutronics and no phase change or corrosion product that could degrade heat transfer. Furthermore, the particle coatings and interstitial graphite retain fission products such that the source terms at the plant boundary remain well below actionable levels under all anticipated nominal and off-normal operating conditions. These attributes enable the reactor to supply process heat to a collocated industrial plant with negligible risk of contamination and minimal dynamic coupling of the facilities (Figure 1). The exceptional retentive properties of coated particle fuel in a graphite matrix were first demonstrated in the DRAGON reactor, a European research facility that began operation in 1964.« less

  12. Baseline Concept Description of a Small Modular High Temperature Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gougar, Hans D.

    2014-10-01

    The objective of this report is to provide a description of generic small modular high temperature reactors (herein denoted as an smHTR), summarize their distinguishing attributes, and lay out the research and development (R&D) required for commercialization. The generic concepts rely heavily on the modular high temperature gas-cooled reactor designs developed in the 1980s which were never built but for which pre-licensing or certification activities were conducted. The concept matured more recently under the Next Generation Nuclear Plant (NGNP) project, specifically in the areas of fuel and material qualification, methods development, and licensing. As all vendor-specific designs proposed under NGNPmore » were all both ‘small’ or medium-sized and ‘modular’ by International Atomic Energy Agency (IAEA) and Department of Energy (DOE) standards, the technical attributes, challenges, and R&D needs identified, addressed, and documented under NGNP are valid and appropriate in the context of Small Modular Reactor (SMR) applications. Although the term High Temperature Reactor (HTR) is commonly used to denote graphite-moderated, thermal spectrum reactors with coolant temperatures in excess of 650oC at the core outlet, in this report the historical term High Temperature Gas-Cooled Reactor (HTGR) will be used to distinguish the gas-cooled technology described herein from its liquid salt-cooled cousin. Moreover, in this report it is to be understood that the outlet temperature of the helium in an HTGR has an upper limit of 950 degrees C which corresponds to the temperature to which certain alloys are currently being qualified under DOE’s ARC program. Although similar to the HTGR in just about every respect, the Very High Temperature Reactor (VHTR) may have an outlet temperature in excess of 950 degrees C and is therefore farther from commercialization because of the challenges posed to materials exposed to these temperatures. The VHTR is the focus of R&D under the Generation IV program and its specific R&D needs will be included in this report when appropriate for comparison. The distinguishing features of the HTGR are the refractory (TRISO) coated particle fuel, the low-power density, graphite-moderated core, and the high outlet temperature of the inert helium coolant. The low power density and fuel form effectively eliminate the possibility of core melt, even upon a complete loss of coolant pressure and flow. The graphite, which constitutes the bulk of the core volume and mass, provides a large thermal buffer that absorbs fission heat such that thermal transients occur over a timespan of hours or even days. As chemically-inert helium is already a gas, there is no coolant temperature or void feedback on the neutronics and no phase change or corrosion product that could degrade heat transfer. Furthermore, the particle coatings and interstitial graphite retain fission products such that the source terms at the plant boundary remain well below actionable levels under all anticipated nominal and off-normal operating conditions. These attributes enable the reactor to supply process heat to a collocated industrial plant with negligible risk of contamination and minimal dynamic coupling of the facilities (Figure 1). The exceptional retentive properties of coated particle fuel in a graphite matrix were first demonstrated in the DRAGON reactor, a European research facility that began operation in 1964.« less

  13. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Classification of operator licenses and... OPERATORS General § 13.7 Classification of operator licenses and endorsements. (a) Commercial radio operator... license's ITU classification, if different from its name, is given in parentheses. (1) First Class...

  14. Site Environmental Report for Calendar Year 2000. DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rutherford, Phil; Samuels, Sandy; Lee, Majelle

    2001-09-01

    This Annual Site Environmental Report (ASER) for 2000 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the former Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. All nuclear work was terminated in 1988, andmore » subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 2000 continue to indicate no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.« less

  15. 47 CFR 1.85 - Suspension of operator licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... license is ordered suspended, the operator shall send his operator license to the Licensing and Technical Analysis Branch, Public Safety and Private Wireless Division, Wireless Telecommunications Bureau, in...

  16. 47 CFR 1.85 - Suspension of operator licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... license is ordered suspended, the operator shall send his operator license to the Licensing and Technical Analysis Branch, Public Safety and Private Wireless Division, Wireless Telecommunications Bureau, in...

  17. 75 FR 4493 - Natural Resources Defense Council; Denial of Petition for Rulemaking

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... NRC continues to license the civilian use of HEU to fuel seven existing research and test reactors... predicts that the three HEU-fueled TRIGA-type research reactors at Oregon State University, the University...) is scheduled for conversion to LEU but notes that the newer and larger LEU-fueled TRIGA facility at...

  18. 76 FR 30404 - Advisory Committee On Reactor Safeguards; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... Room T2-B1, 11545 Rockville Pike, Rockville, Maryland 8:30 a.m.-8:35 a.m.: Opening Remarks by the ACRS... Alloy Cladding.'' 10:45 a.m.-11:45 a.m.: Revised Safety Evaluation Report Associated with the License... to the safety evaluation report associated with the license renewal application for the Hope Creek...

  19. 76 FR 81992 - PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... License Application for Bell Bend Nuclear Power Plant; Exemption 1.0 Background PPL Bell Bend, LLC... for Nuclear Power Plants.'' This reactor is to be identified as Bell Bend Nuclear Power Plant (BBNPP... based upon the U.S. EPR reference COL (RCOL) application for UniStar's Calvert Cliffs Nuclear Power...

  20. JPRS Report, Science & Technology, Europe & Latin America, Argentina: Specifications of ARGOS 380 MW Reactor.

    DTIC Science & Technology

    1988-02-18

    programme. It has a licensing agreement with Siemens AG’s Kraftwerk Union AG, which is its minor shareholder. Under this agreement, ENACE has the...Argentine nuclear programme. It has a licensing agreement with Siemens AG’s Kraftwerk Union AG, which is its minor shareholder. Under this agreement, ENACE

Top