Building Maintenance and Repair Data for Life-Cycle Cost Analyses: Electrical Systems.
1991-05-01
Repair Data for Life-Cycle Cost Analyses: Electrical Systems by Edgar S. Neely Robert D. Neathammer James R. Stirn Robert P. Winkler This research...systems have been developed to assist planners in preparing DD Form 1391 documentation, designers in life-cycle cost component selection, and maintainers...Maintenance and Repair Data for Life-Cycle Cost Analyses: RDTE dated 1980 Electrical Systems REIMB 1984 - 1989 6. AUTH4OR(S) Edgar S. Neely, Robert D
ERIC Educational Resources Information Center
Roodvoets, David L.
2003-01-01
Presents factors to consider when determining roofing life-cycle costs, explaining that costs do not tell the whole story; discussing components that should go into the decision (cost, maintenance, energy use, and environmental costs); and concluding that important elements in reducing life-cycle costs include energy savings through increased…
Bus Lifecycle Cost Model for Federal Land Management Agencies.
DOT National Transportation Integrated Search
2011-09-30
The Bus Lifecycle Cost Model is a spreadsheet-based planning tool that estimates capital, operating, and maintenance costs for various bus types over the full lifecycle of the vehicle. The model is based on a number of operating characteristics, incl...
Planning for Cost Effectiveness.
ERIC Educational Resources Information Center
Schlaebitz, William D.
1984-01-01
A heat pump life-cycle cost analysis is used to explain the technique. Items suggested for the life-cycle analysis approach include lighting, longer-life batteries, site maintenance, and retaining experts to inspect specific building components. (MLF)
10 CFR 455.64 - Life-cycle cost methodology.
Code of Federal Regulations, 2012 CFR
2012-01-01
...-investment ratio is the ratio of the present value of net cost savings attributable to an energy conservation measure to the present value of the net increase in investment, maintenance and operating, and replacement... present value. The format for displaying life-cycle costs shall be a savings-to-investment ratio. (b) An...
10 CFR 455.64 - Life-cycle cost methodology.
Code of Federal Regulations, 2013 CFR
2013-01-01
...-investment ratio is the ratio of the present value of net cost savings attributable to an energy conservation measure to the present value of the net increase in investment, maintenance and operating, and replacement... present value. The format for displaying life-cycle costs shall be a savings-to-investment ratio. (b) An...
10 CFR 455.64 - Life-cycle cost methodology.
Code of Federal Regulations, 2014 CFR
2014-01-01
...-investment ratio is the ratio of the present value of net cost savings attributable to an energy conservation measure to the present value of the net increase in investment, maintenance and operating, and replacement... present value. The format for displaying life-cycle costs shall be a savings-to-investment ratio. (b) An...
Staley, S; Romlein, J; Chacko, A K; Wider, R
2000-05-01
Picture archiving and communication system (PACS) maintenance on an individual site basis has historically been a complex and costly challenge. With the advent of enterprise-wide PACS projects such as the Virtual Radiology Environment (VRE) project, the challenge of a maintenance program with even more complexities has presented itself. The approach of the project management team for the VRE project is not one of reactive maintenance, but one of highly proactive planning and negotiations, in hopes of capitalizing on the economies of scale of an enterprise-wide PACS maintenance program. A proactive maintenance program is one aspect of life-cycle management. As with any capital acquisition, life-cycle management may be used to manage the specific project aspects related to PACS. The purpose of an enterprise-wide warranty and maintenance life-cycle management approach is to maintain PACS at its maximum operational efficiency and utilization levels through a flexible, shared, yet symbiotic relationship between local, regional, and vendor resources. These goals include providing maximum operational performance levels on a local, regional, and enterprise basis, while maintaining acceptable costs and resource utilization levels. This goal must be achieved without negatively impacting point of care activities, regardless of changes to the clinical business environment.
The economics of satellite maintenance
NASA Technical Reports Server (NTRS)
Derocher, W. L., Jr.; Sosnay, R. G.
1975-01-01
The primary goal of the space transportation system - to reduce the cost of space programs while satisfying their mission requirements - can be enhanced by the proper choice of a satellite-maintenance concept. This paper develops the life-cycle costs of performing an automated satellite program during the shuttle era in three competitive modes: expendable, ground-refurbishable, and in-orbit maintainable. In-orbit maintenance is shown to be the most economic maintenance mode for both low- and high-earth orbits.
2015-03-21
3 Navy Depot Maintenance Strategic Plan (2014– 2019 ... Tech Center in-sourcing initiative saves between $52 and $203 million in data system costs over the life of the project. The Army claims in...maintenance budgets at the DOD and the Navy are highlighted, and the Navy Depot Maintenance Strategic Plan (2014– 2019 ) is introduced. The Problem
2015-05-01
management during operations 4 Potential Technology 3: Additive Manufacturing (“ 3D Printing ”) 5 • 3D design/image (e.g. from 3D LS) of final part...1 Make or Buy: Cost Impacts of Additive Manufacturing, 3D Laser Scanning Technology, and Collaborative Product Lifecycle Management on Ship...DATES COVERED 00-00-2015 to 00-00-2015 4. TITLE AND SUBTITLE Make or Buy: Cost Impacts of Additive Manufacturing, 3D Laser Scanning Technology
ERIC Educational Resources Information Center
Kincaid, Douglas W.; Dillinger, Eric T.; Clayton, Michael
2006-01-01
Maintenance and operations (M&O) requirements dominate the life-cycle cost of a school facility. Historically, facility managers have struggled to secure funding to meet these requirements. Many deferred-maintenance issues result directly from M&O underfunding. However, new approaches and technologies now enable facility managers to use…
[A Medical Devices Management Information System Supporting Full Life-Cycle Process Management].
Tang, Guoping; Hu, Liang
2015-07-01
Medical equipments are essential supplies to carry out medical work. How to ensure the safety and reliability of the medical equipments in diagnosis, and reduce procurement and maintenance costs is a topic of concern to everyone. In this paper, product lifecycle management (PLM) and enterprise resource planning (ERP) are cited to establish a lifecycle management information system. Through integrative and analysis of the various stages of the relevant data in life-cycle, it can ensure safety and reliability of medical equipments in the operation and provide the convincing data for meticulous management.
Cost-efficiency of highway operations and maintenance of public-private partnerships.
DOT National Transportation Integrated Search
2014-08-01
While the literature on public-private partnerships (PPPs) argues that the private sectors life-cycle : approach to design and construction results in operational cost efficiencies, empirical support is : missing. This study explored that issue by...
Operations and maintenance philosophy
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN, G.P.
1999-10-28
This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.
A 20 Year Lifecycle Study for Launch Facilities at the Kennedy Space Center
NASA Technical Reports Server (NTRS)
Kolody, Mark R.; Li. Wenyan; Hintze, Paul E.; Calle, Luz-Marina
2009-01-01
The lifecycle cost analysis was based on corrosion costs for the Kennedy Space Center's Launch Complexes and Mobile Launch Platforms. The first step in the study involved identifying the relevant assets that would be included. Secondly, the identification and collection of the corrosion control cost data for the selected assets was completed. Corrosion control costs were separated into four categories. The sources of cost included the NASA labor for civil servant personnel directly involved in overseeing and managing corrosion control of the assets, United Space Alliance (USA) contractual requirements for performing planned corrosion control tasks, USA performance of unplanned corrosion control tasks, and Testing and Development. Corrosion control operations performed under USA contractual requirements were the most significant contributors to the total cost of corrosion. The operations include the inspection of the pad, routine maintenance of the pad, medium and large scale blasting and repainting activities, and the repair and replacement of structural metal elements. Cost data was collected from the years between 2001 and 2007. These costs were then extrapolated to future years to calculate the 20 year lifecycle costs.
Joint Removal Implications : Thermal Analysis and Life-Cycle Cost
DOT National Transportation Integrated Search
2018-04-01
Deck joints are causing significant bridge deterioration and maintenance problems for Departments of Transportation (DOTs). Colorado State University researchers partnered with the Colorado DOT to analyze the effects of temperature change and thermal...
Model of the Product Development Lifecycle.
DOE Office of Scientific and Technical Information (OSTI.GOV)
He, Sunny L.; Roe, Natalie H.; Wood, Evan
2015-10-01
While the increased use of Commercial Off-The-Shelf information technology equipment has presented opportunities for improved cost effectiveness and flexibility, the corresponding loss of control over the product's development creates unique vulnerabilities and security concerns. Of particular interest is the possibility of a supply chain attack. A comprehensive model for the lifecycle of hardware and software products is proposed based on a survey of existing literature from academic, government, and industry sources. Seven major lifecycle stages are identified and defined: (1) Requirements, (2) Design, (3) Manufacturing for hardware and Development for software, (4) Testing, (5) Distribution, (6) Use and Maintenance, andmore » (7) Disposal. The model is then applied to examine the risk of attacks at various stages of the lifecycle.« less
FUEL-EFFICIENT SEWAGE SLUDGE INCINERATION
A study was performed to evaluate the status of incineration with low fuel use as a sludge disposal technology. The energy requirements, life-cycle costs, operation and maintenance requirements, and process capabilities of four sludge incineration facilities were evaluated. These...
Optimization of monitoring and inspections in the life-cycle of wind turbines
NASA Astrophysics Data System (ADS)
Hanish Nithin, Anu; Omenzetter, Piotr
2016-04-01
The past decade has witnessed a surge in the offshore wind farm developments across the world. Although this form of cleaner and greener energy is beneficial and eco-friendly, the production of wind energy entails high life-cycle costs. The costs associated with inspections, monitoring and repairs of wind turbines are primary contributors to the high costs of electricity produced in this way and are disadvantageous in today's competitive economic environment. There is limited research being done in the probabilistic optimization of life-cycle costs of offshore wind turbines structures and their components. This paper proposes a framework for assessing the life cycle cost of wind turbine structures subject to damage and deterioration. The objective of the paper is to develop a mathematical probabilistic cost assessment framework which considers deterioration, inspection, monitoring, repair and maintenance models and their uncertainties. The uncertainties are etched in the accuracy and precision of the monitoring and inspection methods and can be considered through the probability of damage detection of each method. Schedules for inspection, monitoring and repair actions are demonstrated using a decision tree. Examples of a generalised deterioration process integrated with the cost analysis using a decision tree are shown for a wind turbine foundation structure.
Life-cycle Economic and Environmental Effects of Green, Gray and Hybrid Stormwater Infrastructure
NASA Astrophysics Data System (ADS)
Stokes-Draut, J. R.; Taptich, M. N.; Horvath, A.
2016-12-01
Cities throughout the U.S. are seeking efficient ways to manage stormwater for many reasons, including flood control, pollution management, water supply augmentation and to prepare for a changing climate. Traditionally, cities have relied primarily on gray infrastructure, namely sewers, storage and treatment facilities. In these systems, urban runoff, its volume increasing as impervious surfaces expand, is channeled to a wastewater plant where it is mixed with raw sewage prior to treatment or it is discharged, generally untreated, to local water bodies. These facilities are inflexible and expensive to build and maintain. Many systems are deteriorating and/or approaching, if not exceeding, their design capacity. Increasingly, more innovative approaches that integrate stormwater management into the natural environment and that make sense at both local and regional scales are sought. Identifying the best stormwater solution will require evaluating the life-cycle economic costs associated with these alternatives, including costs associated with construction, operation, and maintenance including regulatory and permitting costs, financing, as well as other indirect costs (e.g., avoided wastewater processing or system capacity expansion, increased property value) and non-economic co-benefits (i.e, aesthetics, habitat provision). Beyond conventional life-cycle costing, applying life-cycle assessment (LCA) will contribute to more holistic and sustainable decision-making. LCA can be used to quantitatively track energy use, greenhouse gas emissions, and other environmental effects associated with constructing, operating, and maintaining green and gray infrastructure, including supply chain contributions. We will present the current state of knowledge for implementing life-cycle costing and LCA into stormwater management decisions for green, gray and hybrid infrastructure.
2016-01-30
SPONSORED REPORT SERIES Make or Buy: An Analysis of the Impacts of 3D Printing Operations, 3D Laser Scanning Technology, and Collaborative...Report Series Make or Buy: An Analysis of the Impacts of 3D Printing Operations, 3D Laser Scanning Technology, and Collaborative Product Lifecycle...Application Areas for 3D Printing ........................................................ 36 Figure 15. Potential Applications of 3D
Optimal Preventive Maintenance Schedule based on Lifecycle Cost and Time-Dependent Reliability
2011-11-10
Page 1 of 16 UNCLASSIFIED: Distribution Statement A. Approved for public release. 12IDM-0064 Optimal Preventive Maintenance Schedule based... 1 . INTRODUCTION Customers and product manufacturers demand continued functionality of complex equipment and processes. Degradation of material...Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response
Work plan for special design features and crack sealing maintenance.
DOT National Transportation Integrated Search
2013-09-01
The Alaska DOT&PF wants to construct and maintain asphalt concrete (AC) paved highways in a way that minimizes roadway lifecycle costs while preserving acceptable : performance. Thermal cracking is a natural feature of most paved Alaska roadways that...
Economics of Concrete and Wood Tie Track Structures
DOT National Transportation Integrated Search
1978-08-01
This report presents results from an evaluation of the economic benefits of concrete- versus wood-tie track. The analysis includes the life-cycle capital, maintenance, and renewal costs for concrete- and wood-tie track for four specific test cases an...
MESSOC capabilities and results. [Model for Estimating Space Station Opertions Costs
NASA Technical Reports Server (NTRS)
Shishko, Robert
1990-01-01
MESSOC (Model for Estimating Space Station Operations Costs) is the result of a multi-year effort by NASA to understand and model the mature operations cost of Space Station Freedom. This paper focuses on MESSOC's ability to contribute to life-cycle cost analyses through its logistics equations and databases. Together, these afford MESSOC the capability to project not only annual logistics costs for a variety of Space Station scenarios, but critical non-cost logistics results such as annual Station maintenance crewhours, upweight/downweight, and on-orbit sparing availability as well. MESSOC results using current logistics databases and baseline scenario have already shown important implications for on-orbit maintenance approaches, space transportation systems, and international operations cost sharing.
Energy Efficiency in Libraries.
ERIC Educational Resources Information Center
Lewis, Eleanor J.; And Others
1993-01-01
Shows how libraries can save money and energy with energy-efficient technologies, improving maintenance, and encouraging staff efforts to conserve energy. Specific techniques such as life-cycle cost analysis and energy audits focusing on lighting, heating, ventilation, air conditioning, and water efficiency are described. Funding options and…
Metal Roofing in a "Class" by Itself.
ERIC Educational Resources Information Center
Nimtz, Paul D.
1990-01-01
The structural standing seam roof has the advantages of ease of application, low maintenance, and low life-cycle costs. Explains and illustrates how the system's concealed clip attachments are designed so that the roof panels can expand and contract independently of the insulation. (MLF)
Integration of RAMS in LCC analysis for linear transport infrastructures. A case study for railways.
NASA Astrophysics Data System (ADS)
Calle-Cordón, Álvaro; Jiménez-Redondo, Noemi; Morales-Gámiz, F. J.; García-Villena, F. A.; Garmabaki, Amir H. S.; Odelius, Johan
2017-09-01
Life-cycle cost (LCC) analysis is an economic technique used to assess the total costs associated with the lifetime of a system in order to support decision making in long term strategic planning. For complex systems, such as railway and road infrastructures, the cost of maintenance plays an important role in the LCC analysis. Costs associated with maintenance interventions can be more reliably estimated by integrating the probabilistic nature of the failures associated to these interventions in the LCC models. Reliability, Maintainability, Availability and Safety (RAMS) parameters describe the maintenance needs of an asset in a quantitative way by using probabilistic information extracted from registered maintenance activities. Therefore, the integration of RAMS in the LCC analysis allows obtaining reliable predictions of system maintenance costs and the dependencies of these costs with specific cost drivers through sensitivity analyses. This paper presents an innovative approach for a combined RAMS & LCC methodology for railway and road transport infrastructures being developed under the on-going H2020 project INFRALERT. Such RAMS & LCC analysis provides relevant probabilistic information to be used for condition and risk-based planning of maintenance activities as well as for decision support in long term strategic investment planning.
14 CFR 170.25 - LORAN-C discontinuance criteria.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Section 170.25 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... nonprecision approach may be subject to discontinuance when the present value of the continued maintenance costs (PVCM) of the LORAN-C approach exceed the present value of its remaining life-cycle benefits (PVB...
NASA Astrophysics Data System (ADS)
Hanish Nithin, Anu; Omenzetter, Piotr
2017-04-01
Optimization of the life-cycle costs and reliability of offshore wind turbines (OWTs) is an area of immense interest due to the widespread increase in wind power generation across the world. Most of the existing studies have used structural reliability and the Bayesian pre-posterior analysis for optimization. This paper proposes an extension to the previous approaches in a framework for probabilistic optimization of the total life-cycle costs and reliability of OWTs by combining the elements of structural reliability/risk analysis (SRA), the Bayesian pre-posterior analysis with optimization through a genetic algorithm (GA). The SRA techniques are adopted to compute the probabilities of damage occurrence and failure associated with the deterioration model. The probabilities are used in the decision tree and are updated using the Bayesian analysis. The output of this framework would determine the optimal structural health monitoring and maintenance schedules to be implemented during the life span of OWTs while maintaining a trade-off between the life-cycle costs and risk of the structural failure. Numerical illustrations with a generic deterioration model for one monitoring exercise in the life cycle of a system are demonstrated. Two case scenarios, namely to build initially an expensive and robust or a cheaper but more quickly deteriorating structures and to adopt expensive monitoring system, are presented to aid in the decision-making process.
2013-12-04
Table 3. Monthly PMCS Actions and Labor Required Task Hours Task Hours Inspect cab and hood 1.0 Inspect turbocharger 0.5 Inspect fuel tank 0.1 Inspect...Annual PMCS Actions and Labor Required Task Hours Task Hours Inspect cab and hood 1.0 Air intake system 0.2 Inspect fuel Tank 0.1 Inspect turbocharger
Life-Cycle Analysis of Aircraft Turbine Engines
1977-11-01
actual experience. Mixed but promisng results were obtained in modeling ownership costs for military engines. Depot maintenance costs were more...Acquisition Experience, The Rand Corporation, RM-6072-PR, November 1969. System Acquisition Stategies , The Rand Corporation, R-733-PR/ARPA, June 1971. 98...Paris, 1971I. Phillips. Almarin, Technology and Market Structure, IA•xington Books, D.C. Heath and Company, Lexington, Mass.. 1971. A Position Paper on
NASA Astrophysics Data System (ADS)
Choi, Wongyu; Pate, Michael B.; Warren, Ryan D.; Nelson, Ron M.
2018-05-01
This paper presents an economic analysis of stationary and dual-axis tracking photovoltaic (PV) systems installed in the US Upper Midwest in terms of life-cycle costs, payback period, internal rate of return, and the incremental cost of solar energy. The first-year performance and energy savings were experimentally found along with documented initial cost. Future PV performance, savings, and operating and maintenance costs were estimated over 25-year assumed life. Under the given assumptions and discount rates, the life-cycle savings were found to be negative. Neither system was found to have payback periods less than the assumed system life. The lifetime average incremental costs of energy generated by the stationary and dual-axis tracking systems were estimated to be 0.31 and 0.37 per kWh generated, respectively. Economic analyses of different scenarios, each having a unique set of assumptions for costs and metering, showed a potential for economic feasibility under certain conditions when compared to alternative investments with assumed yields.
2014-10-02
MPD. This manufacturer documentation contains maintenance tasks with specification of intervals and required man-hours that are to be carried out...failures, without consideration of false alarms and missed failures (see also section 4.1.3). The task redundancy rate is the percentage of preventive...Prognostics and Health Management ROI return on investment RUL remaining useful life TCG task code group SB Service Bulletin XML Extensible Markup
Using Facility Condition Assessments to Identify Actions Related to Infrastructure
NASA Technical Reports Server (NTRS)
Rubert, Kennedy F.
2010-01-01
To support cost effective, quality research it is essential that laboratory and testing facilities are maintained in a continuous and reliable state of availability at all times. NASA Langley Research Center (LaRC) and its maintenance contractor, Jacobs Technology, Inc. Research Operations, Maintenance, and Engineering (ROME) group, are in the process of implementing a combined Facility Condition Assessment (FCA) and Reliability Centered Maintenance (RCM) program to improve asset management and overall reliability of testing equipment in facilities such as wind tunnels. Specific areas are being identified for improvement, the deferred maintenance cost is being estimated, and priority is being assigned against facilities where conditions have been allowed to deteriorate. This assessment serves to assist in determining where to commit available funds on the Center. RCM methodologies are being reviewed and enhanced to assure that appropriate preventive, predictive, and facilities/equipment acceptance techniques are incorporated to prolong lifecycle availability and assure reliability at minimum cost. The results from the program have been favorable, better enabling LaRC to manage assets prudently.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Chan-Joong; Kim, Jimin; Hong, Taehoon
Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developedmore » system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to establish the optimal O&M strategy at the program-level. • It can be applied to any other country or sector in the global environment.« less
2011-04-30
developed the Knowledge Value Added + Systems Dynamics + Integrated Risk Management (KVA+SD+IRM) valuation framework to address these issues. KVA+SD...SD+IRM framework is used to quantify process cost savings and the potential benefits of selecting collab-PLM+3D TLS technology in the ship SHIPMAIN...The first section of this paper explicates the KVA+SD+IRM framework . In section two, a description of the SHIPMAIN program is provided. The third
10 CFR 435.8 - Life-cycle costing.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Life-cycle costing. 435.8 Section 435.8 Energy DEPARTMENT...-cycle costing. Each Federal agency shall determine life-cycle cost-effectiveness by using the procedures..., including lower life-cycle costs, positive net savings, savings-to-investment ratio that is estimated to be...
10 CFR 435.8 - Life-cycle costing.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Life-cycle costing. 435.8 Section 435.8 Energy DEPARTMENT...-cycle costing. Each Federal agency shall determine life-cycle cost-effectiveness by using the procedures..., including lower life-cycle costs, positive net savings, savings-to-investment ratio that is estimated to be...
10 CFR 435.8 - Life-cycle costing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Life-cycle costing. 435.8 Section 435.8 Energy DEPARTMENT...-cycle costing. Each Federal agency shall determine life-cycle cost-effectiveness by using the procedures..., including lower life-cycle costs, positive net savings, savings-to-investment ratio that is estimated to be...
Data Service Provider Cost Estimation Tool
NASA Technical Reports Server (NTRS)
Fontaine, Kathy; Hunolt, Greg; Booth, Arthur L.; Banks, Mel
2011-01-01
The Data Service Provider Cost Estimation Tool (CET) and Comparables Database (CDB) package provides to NASA s Earth Science Enterprise (ESE) the ability to estimate the full range of year-by-year lifecycle cost estimates for the implementation and operation of data service providers required by ESE to support its science and applications programs. The CET can make estimates dealing with staffing costs, supplies, facility costs, network services, hardware and maintenance, commercial off-the-shelf (COTS) software licenses, software development and sustaining engineering, and the changes in costs that result from changes in workload. Data Service Providers may be stand-alone or embedded in flight projects, field campaigns, research or applications projects, or other activities. The CET and CDB package employs a cost-estimation-by-analogy approach. It is based on a new, general data service provider reference model that provides a framework for construction of a database by describing existing data service providers that are analogs (or comparables) to planned, new ESE data service providers. The CET implements the staff effort and cost estimation algorithms that access the CDB and generates the lifecycle cost estimate for a new data services provider. This data creates a common basis for an ESE proposal evaluator for considering projected data service provider costs.
Maritime vessel obsolescence, life cycle cost and design service life
NASA Astrophysics Data System (ADS)
Dinu, O.; Ilie, A. M.
2015-11-01
Maritime vessels have long service life and great costs of building, manning, operating, maintaining and repairing throughout their life. Major actions are needed to repair, renovate, sometime built or even replace those scrapped when technology or demand changes determine obsolescence. It is regarded as a concern throughout vessel's entire life cycle and reflects changes in expectation regarding performances in functioning, safety and environmental effects. While service live may differ from physical lives, expectations about physical lives is the main factors that determines design service life. Performance and failure are illustrated conceptually and represented in a simplified form considering the evolution of vessels parameters during its service life. In the proposed methodology an accumulated vessel lifecycle cost is analyzed and obsolescence is characterized from ship's design, performances, maintenance and management parameters point of view. Romanian ports feeding Black Sea are investigated in order to provide comprehensive information on: number and types of vessels, transport capacity and life cycle length. Recommendations are to be made in order to insure a best practice in lifecycle management in order to reduce costs.
Environmental Assessment of the General Plan and Maintenance of Patrick Air Force Base, Florida
2012-07-17
water consumption . Per the National Energy Conservation Policy Act, sustainable design principles and life-cycle cost- effective technologies will...attached EA concluded that no significant adverse effects will result. No significant adverse cumulative impacts will result from activities associated...resources will be considered an adverse effect , however, sufficient documentation had been received for Facilities 1322, 1327, 1330, 1425, 1432, 1437 and
10 CFR 435.8 - Life-cycle costing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Life-cycle costing. 435.8 Section 435.8 Energy DEPARTMENT... BUILDINGS Mandatory Energy Efficiency Standards for Federal Low-Rise Residential Buildings. § 435.8 Life-cycle costing. Each Federal agency shall determine life-cycle cost-effectiveness by using the procedures...
10 CFR 435.8 - Life-cycle costing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Life-cycle costing. 435.8 Section 435.8 Energy DEPARTMENT... BUILDINGS Mandatory Energy Efficiency Standards for Federal Low-Rise Residential Buildings. § 435.8 Life-cycle costing. Each Federal agency shall determine life-cycle cost-effectiveness by using the procedures...
CALiPER Report 21.3: Cost-Effectiveness of Linear (T8) LED Lamps
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, Naomi J.; Perrin, Tess E.; Royer, Michael P.
2014-05-27
Meeting performance expectations is important for driving adoption of linear LED lamps, but cost-effectiveness may be an overriding factor in many cases. Linear LED lamps cost more initially than fluorescent lamps, but energy and maintenance savings may mean that the life-cycle cost is lower. This report details a series of life-cycle cost simulations that compared a two-lamp troffer using LED lamps (38 W total power draw) or fluorescent lamps (51 W total power draw) over a 10-year study period. Variables included LED system cost ($40, $80, or $120), annual operating hours (2,000 hours or 4,000 hours), LED installation time (15more » minutes or 30 minutes), and melded electricity rate ($0.06/kWh, $0.12/kWh, $0.18/kWh, or $0.24/kWh). A full factorial of simulations allows users to interpolate between these values to aid in making rough estimates of economic feasibility for their own projects. In general, while their initial cost premium remains high, linear LED lamps are more likely to be cost-effective when electric utility rates are higher than average and hours of operation are long, and if their installation time is shorter.« less
CALiPER Report 21.3. Cost Effectiveness of Linear (T8) LED Lamps
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-05-01
Meeting performance expectations is important for driving adoption of linear LED lamps, but cost-effectiveness may be an overriding factor in many cases. Linear LED lamps cost more initially than fluorescent lamps, but energy and maintenance savings may mean that the life-cycle cost is lower. This report details a series of life-cycle cost simulations that compared a two-lamp troffer using LED lamps (38 W total power draw) or fluorescent lamps (51 W total power draw) over a 10-year study period. Variables included LED system cost ($40, $80, or $120), annual operating hours (2,000 hours or 4,000 hours), LED installation time (15more » minutes or 30 minutes), and melded electricity rate ($0.06/kWh, $0.12/kWh, $0.18/kWh, or $0.24/kWh). A full factorial of simulations allows users to interpolate between these values to aid in making rough estimates of economic feasibility for their own projects. In general, while their initial cost premium remains high, linear LED lamps are more likely to be cost-effective when electric utility rates are higher than average and hours of operation are long, and if their installation time is shorter.« less
10 CFR 433.8 - Life-cycle costing.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Life-cycle costing. 433.8 Section 433.8 Energy DEPARTMENT... HIGH-RISE RESIDENTIAL BUILDINGS § 433.8 Life-cycle costing. Each Federal agency shall determine life... choose to use any of four methods, including lower life-cycle costs, positive net savings, savings-to...
10 CFR 436.42 - Evaluation of Life-Cycle Cost Effectiveness.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Evaluation of Life-Cycle Cost Effectiveness. 436.42... PROGRAMS Agency Procurement of Energy Efficient Products § 436.42 Evaluation of Life-Cycle Cost...) ENERGY STAR qualified and FEMP designated products may be assumed to be life-cycle cost-effective. (b) In...
10 CFR 433.8 - Life-cycle costing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Life-cycle costing. 433.8 Section 433.8 Energy DEPARTMENT... HIGH-RISE RESIDENTIAL BUILDINGS § 433.8 Life-cycle costing. Each Federal agency shall determine life... choose to use any of four methods, including lower life-cycle costs, positive net savings, savings-to...
10 CFR 436.42 - Evaluation of Life-Cycle Cost Effectiveness.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Evaluation of Life-Cycle Cost Effectiveness. 436.42... PROGRAMS Agency Procurement of Energy Efficient Products § 436.42 Evaluation of Life-Cycle Cost...) ENERGY STAR qualified and FEMP designated products may be assumed to be life-cycle cost-effective. (b) In...
10 CFR 436.42 - Evaluation of Life-Cycle Cost Effectiveness.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Evaluation of Life-Cycle Cost Effectiveness. 436.42... PROGRAMS Agency Procurement of Energy Efficient Products § 436.42 Evaluation of Life-Cycle Cost...) ENERGY STAR qualified and FEMP designated products may be assumed to be life-cycle cost-effective. (b) In...
10 CFR 433.8 - Life-cycle costing.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Life-cycle costing. 433.8 Section 433.8 Energy DEPARTMENT... HIGH-RISE RESIDENTIAL BUILDINGS § 433.8 Life-cycle costing. Each Federal agency shall determine life... choose to use any of four methods, including lower life-cycle costs, positive net savings, savings-to...
10 CFR 433.8 - Life-cycle costing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Life-cycle costing. 433.8 Section 433.8 Energy DEPARTMENT... FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.8 Life-cycle costing. Each Federal agency shall determine life-cycle cost-effectiveness by using the procedures set out in subpart A...
10 CFR 433.8 - Life-cycle costing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Life-cycle costing. 433.8 Section 433.8 Energy DEPARTMENT... FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.8 Life-cycle costing. Each Federal agency shall determine life-cycle cost-effectiveness by using the procedures set out in subpart A...
10 CFR 436.42 - Evaluation of Life-Cycle Cost Effectiveness.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Evaluation of Life-Cycle Cost Effectiveness. 436.42... PROGRAMS Agency Procurement of Energy Efficient Products § 436.42 Evaluation of Life-Cycle Cost...) ENERGY STAR qualified and FEMP designated products may be assumed to be life-cycle cost-effective. (b) In...
10 CFR 436.42 - Evaluation of Life-Cycle Cost Effectiveness.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the life-cycle cost analysis method in part 436, subpart A, of title 10 of the Code of Federal... 10 Energy 3 2011-01-01 2011-01-01 false Evaluation of Life-Cycle Cost Effectiveness. 436.42... PROGRAMS Agency Procurement of Energy Efficient Products § 436.42 Evaluation of Life-Cycle Cost...
10 CFR 455.64 - Life-cycle cost methodology.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Life-cycle cost methodology. 455.64 Section 455.64 Energy..., Hospitals, Units of Local Government, and Public Care Institutions § 455.64 Life-cycle cost methodology. (a) The life-cycle cost methodology under § 455.63(b) of this part is a systematic comparison of the...
10 CFR 455.64 - Life-cycle cost methodology.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Life-cycle cost methodology. 455.64 Section 455.64 Energy..., Hospitals, Units of Local Government, and Public Care Institutions § 455.64 Life-cycle cost methodology. (a) The life-cycle cost methodology under § 455.63(b) of this part is a systematic comparison of the...
2011-09-20
optimal portfolio point on the efficient frontier, for example, Portfolio B on the chart in Figure A1. Then, by subsequently changing some of the ... optimized portfolio controlling for risk using the IRM methodology and tool suite. Results indicate that both rapid and incremental implementation...Results of the KVA and SD scenario analysis provided the financial information required to forecast an optimized
NASA Technical Reports Server (NTRS)
Chien, Steve A.
1996-01-01
A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintainting the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems. This paper describes a planning application of automated imaging processing and our overall approach to knowledge acquisition for this application.
Evaluation of life-cycle air emission factors of freight transportation.
Facanha, Cristiano; Horvath, Arpad
2007-10-15
Life-cycle air emission factors associated with road, rail, and air transportation of freight in the United States are analyzed. All life-cycle phases of vehicles, infrastructure, and fuels are accounted for in a hybrid life-cycle assessment (LCA). It includes not only fuel combustion, but also emissions from vehicle manufacturing, maintenance, and end of life, infrastructure construction, operation, maintenance, and end of life, and petroleum exploration, refining, and fuel distribution. Results indicate that total life-cycle emissions of freight transportation modes are underestimated if only tailpipe emissions are accounted for. In the case of CO2 and NOx, tailpipe emissions underestimate total emissions by up to 38%, depending on the mode. Total life-cycle emissions of CO and SO2 are up to seven times higher than tailpipe emissions. Sensitivity analysis considers the effects of vehicle type, geography, and mode efficiency on the final results. Policy implications of this analysis are also discussed. For example, while it is widely assumed that currently proposed regulations will result in substantial reductions in emissions, we find that this is true for NOx, emissions, because fuel combustion is the main cause, and to a lesser extent for SO2, but not for PM10 emissions, which are significantly affected by the other life-cycle phases.
32 CFR Appendix to Part 162 - Reporting Procedures
Code of Federal Regulations, 2014 CFR
2014-07-01
... generated. e. Projected Life-Cycle Savings. For each PIF project provide the estimated amount of savings the project is projected to earn over the project's economic life. f. Projected Life-Cycle Cost Avoidance. For... Projected Life-Cycle Savings. e. Total Projected Life-Cycle Cost Avoidance. 3. CSI. Each DoD Component that...
David Grant Medical Center energy use baseline and integrated resource assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Richman, E.E.; Hoshide, R.K.; Dittmer, A.L.
1993-04-01
The US Air Mobility Command (AMC) has tasked Pacific Northwest Laboratory (PNL) with supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy resource opportunities (EROs) at the David Grant Medical Center (DGMC). This report describes the methodology used to identify and evaluate the EROs at DGMC, provides a life-cycle cost (LCC) analysis for each ERO, and prioritizes any life-cycle cost-effective EROs based on their net present value (NPV), value index (VI), and savings to investment ratio (SIR or ROI). Analysis results are presented for 17 EROsmore » that involve energy use in the areas of lighting, fan and pump motors, boiler operation, infiltration, electric load peak reduction and cogeneration, electric rate structures, and natural gas supply. Typical current energy consumption is approximately 22,900 MWh of electricity (78,300 MBtu), 87,600 kcf of natural gas (90,300 MBtu), and 8,300 gal of fuel oil (1,200 MBtu). A summary of the savings potential by energy-use category of all independent cost-effective EROs is shown in a table. This table includes the first cost, yearly energy consumption savings, and NPV for each energy-use category. The net dollar savings and NPV values as derived by the life-cycle cost analysis are based on the 1992 federal discount rate of 4.6%. The implementation of all EROs could result in a yearly electricity savings of more than 6,000 MWh or 26% of current yearly electricity consumption. More than 15 MW of billable load (total billed by the utility for a 12-month period) or more than 34% of current billed demand could also be saved. Corresponding natural gas savings would be 1,050 kcf (just over 1% of current consumption). Total yearly net energy cost savings for all options would be greater than $343,340. This value does not include any operations and maintenance (O&M) savings.« less
David Grant Medical Center energy use baseline and integrated resource assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Richman, E.E.; Hoshide, R.K.; Dittmer, A.L.
1993-04-01
The US Air Mobility Command (AMC) has tasked Pacific Northwest Laboratory (PNL) with supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy resource opportunities (EROs) at the David Grant Medical Center (DGMC). This report describes the methodology used to identify and evaluate the EROs at DGMC, provides a life-cycle cost (LCC) analysis for each ERO, and prioritizes any life-cycle cost-effective EROs based on their net present value (NPV), value index (VI), and savings to investment ratio (SIR or ROI). Analysis results are presented for 17 EROsmore » that involve energy use in the areas of lighting, fan and pump motors, boiler operation, infiltration, electric load peak reduction and cogeneration, electric rate structures, and natural gas supply. Typical current energy consumption is approximately 22,900 MWh of electricity (78,300 MBtu), 87,600 kcf of natural gas (90,300 MBtu), and 8,300 gal of fuel oil (1,200 MBtu). A summary of the savings potential by energy-use category of all independent cost-effective EROs is shown in a table. This table includes the first cost, yearly energy consumption savings, and NPV for each energy-use category. The net dollar savings and NPV values as derived by the life-cycle cost analysis are based on the 1992 federal discount rate of 4.6%. The implementation of all EROs could result in a yearly electricity savings of more than 6,000 MWh or 26% of current yearly electricity consumption. More than 15 MW of billable load (total billed by the utility for a 12-month period) or more than 34% of current billed demand could also be saved. Corresponding natural gas savings would be 1,050 kcf (just over 1% of current consumption). Total yearly net energy cost savings for all options would be greater than $343,340. This value does not include any operations and maintenance (O M) savings.« less
Flat-plate photovoltaic array design optimization
NASA Technical Reports Server (NTRS)
Ross, R. G., Jr.
1980-01-01
An analysis is presented which integrates the results of specific studies in the areas of photovoltaic structural design optimization, optimization of array series/parallel circuit design, thermal design optimization, and optimization of environmental protection features. The analysis is based on minimizing the total photovoltaic system life-cycle energy cost including repair and replacement of failed cells and modules. This approach is shown to be a useful technique for array optimization, particularly when time-dependent parameters such as array degradation and maintenance are involved.
Application of 6D Building Information Model (6D BIM) for Business-storage Building in Slovenia
NASA Astrophysics Data System (ADS)
Pučko, Zoran; Vincek, Dražen; Štrukelj, Andrej; Šuman, Nataša
2017-10-01
The aim of this paper is to present an application of 6D building information modelling (6D BIM) on a real business-storage building in Slovenia. First, features of building maintenance in general are described according to the current Slovenian legislation, and also a general principle of BIM is given. After that, step-by-step activities for modelling 6D BIM are exposed, namely from Element list for maintenance, determination of their lifetime and service measures, cost analysing and time analysing to 6D BIM modelling. The presented 6D BIM model is designed in a unique way in which cost analysis is performed as 5D BIM model with linked data to use BIM Construction Project Management Software (Vico Office), integrated with 3D BIM model, whereas time analysis as 4D BIM model is carried out as non-linked data with the help of Excel (without connection to 3D BIM model). The paper is intended to serve as a guide to the building owners to prepare 6D BIM and to provide an insight into the relevant dynamic information about intervals and costs for execution of maintenance works in the whole building lifecycle.
Design and operations technologies - Integrating the pieces. [for future space systems design
NASA Technical Reports Server (NTRS)
Eldred, C. H.
1979-01-01
As major elements of life-cycle costs (LCC) having critical impacts on the initiation and utilization of future space programs, the areas of vehicle design and operations are reviewed in order to identify technology requirements. Common to both areas is the requirement for efficient integration of broad, complex systems. Operations technologies focus on the extension of space-based capabilities and cost reduction through the combination of innovative design, low-maintenance hardware, and increased manpower productivity. Design technologies focus on computer-aided techniques which increase productivity while maintaining a high degree of flexibility which enhances creativity and permits graceful design changes.
Terrestrial central station array life-cycle analysis support study
NASA Technical Reports Server (NTRS)
1978-01-01
Plant elements evaluated included designs for module, panel and array structures, as well as balance-of-plant systems. Installation and maintenance procedures and the impact of site environment were also evaluated. In terms of the cost of energy produced, the horizontal array configuration was found to be less expensive than the tandem array at latitudes less than 40 deg. Both of these configurations are less expensive than the rack design. However, the costs of energy for all three configurations are within approximately ?10 percent of each other. For flat plate panels, the seasonally adjusted and tracking array configurations are not economically attractive when compared to the three other designs. Balance-of-plant costs are approximately equal to (goal) module costs. The array structures and foundations are the most expensive items in the balance-of-plant costs.
MAINTENANCE MANAGEMENT ACCOUNTING SYSTEM OF WASTE WATER DISPOSAL SYSTEMS
NASA Astrophysics Data System (ADS)
Hori, Michihiro; Tsuruta, Takashi; Kaito, Kiyoyuki; Kobayashi, Kiyoshi
Sewage works facilities consist of various assets groups. And there are many kinds of financial resources. In order to optimize the maintenance plan, and to secure the stability and sustainability of sewage works management, it is necessary to carry out financial simulation based on the life-cycle cost analysis. Furthermore, it is important to develop management accounting system that is interlinked with the financial accounting system, because many sewage administration bodies have their financial accounting systems as public enterprises. In this paper, a management accounting system, which is designed to provide basic information for asset management of sewage works facilities, is presented. Also the applicability of the management accounting system presented in this paper is examined through financial simulations.
ACARA - AVAILABILITY, COST AND RESOURCE ALLOCATION
NASA Technical Reports Server (NTRS)
Viterna, L. A.
1994-01-01
ACARA is a program for analyzing availability, lifecycle cost, and resource scheduling. It uses a statistical Monte Carlo method to simulate a system's capacity states as well as component failure and repair. Component failures are modelled using a combination of exponential and Weibull probability distributions. ACARA schedules component replacement to achieve optimum system performance. The scheduling will comply with any constraints on component production, resupply vehicle capacity, on-site spares, or crew manpower and equipment. ACARA is capable of many types of analyses and trade studies because of its integrated approach. It characterizes the system performance in terms of both state availability and equivalent availability (a weighted average of state availability). It can determine the probability of exceeding a capacity state to assess reliability and loss of load probability. It can also evaluate the effect of resource constraints on system availability and lifecycle cost. ACARA interprets the results of a simulation and displays tables and charts for: (1) performance, i.e., availability and reliability of capacity states, (2) frequency of failure and repair, (3) lifecycle cost, including hardware, transportation, and maintenance, and (4) usage of available resources, including mass, volume, and maintenance man-hours. ACARA incorporates a user-friendly, menu-driven interface with full screen data entry. It provides a file management system to store and retrieve input and output datasets for system simulation scenarios. ACARA is written in APL2 using the APL2 interpreter for IBM PC compatible systems running MS-DOS. Hardware requirements for the APL2 system include 640K of RAM, 2Mb of extended memory, and an 80386 or 80486 processor with an 80x87 math co-processor. A dot matrix printer is required if the user wishes to print a graph from a results table. A sample MS-DOS executable is provided on the distribution medium. The executable contains licensed material from the APL2 for the IBM PC product which is program property of IBM; Copyright IBM Corporation 1988 - All rights reserved. It is distributed with IBM's permission. The standard distribution medium for this program is a set of three 5.25 inch 360K MS-DOS format diskettes. The contents of the diskettes are compressed using the PKWARE archiving tools. The utility to unarchive the files, PKUNZIP.EXE, is included. ACARA was developed in 1992.
Automated system for definition of life-cycle resources of electromechanical equipment
NASA Astrophysics Data System (ADS)
Zhukovskiy, Y.; Koteleva, N.
2017-02-01
The frequency of maintenance of electromechanical equipment depends on the plant, which uses and runs this equipment. Very often the maintenance frequency is poorly correlated with the actual state of the electromechanical equipment. Furthermore, traditional methods of diagnosis sometimes cannot work without stopping the process (for example, for equipment located in hard to reach places) and so the maintenance costs are increased. This problem can be solved using the indirect methods of diagnosing of the electromechanical equipment. The indirect methods often use the parameters in the real time and seldom use the parameters of traditional diagnostic methods for determination of the resource of electromechanical equipment. This article is dedicated to developing the structure of a special automated control system. This system must use the big flow of the information about the direct and indirect parameters of the equipment state from plants from different areas of industry and factories which produce the electromechanical equipment.
Streamline Your Project: A Lifecycle Model.
ERIC Educational Resources Information Center
Viren, John
2000-01-01
Discusses one approach to project organization providing a baseline lifecycle model for multimedia/CBT development. This variation of the standard four-phase model of Analysis, Design, Development, and Implementation includes a Pre-Analysis phase, called Definition, and a Post-Implementation phase, known as Maintenance. Each phase is described.…
2015-04-30
team from the Naval Postgraduate School conducted a trade -off analysis of in-sourcing (i.e., make) versus outsourcing (i.e., buy) the production of... outsourced , fabricating parts involves an extensive acquisition process in addition to reverse engineering and manufacturing legacy replacement parts...upper left in Figure 1) is outsourcing to the original equipment manufacturer , “Organic” (upper right in Figure 1) is in-sourcing by the U.S
2014-03-01
information modeling guide series: 03—GSA BIM guide for 3D imaging (Ver. 1). Retrieved from http://www.gsa.gov/graphics/pbs/GSA_BIM_Guide_Series_03... model during a KVA knowledge audit at FRC San Diego. The information used in the creation of his KVA models was generated from the SME-provided...Kenney then used the information gathered during SME interviews to reengineer the process to include 3D printing to form his “to-be” model . The
Life-cycle assessment of Nebraska bridges.
DOT National Transportation Integrated Search
2013-05-01
Life-cycle cost analysis (LCCA) is a necessary component in bridge management systems (BMSs) for : assessing investment decisions and identifying the most cost-effective improvement alternatives. The : LCCA helps to identify the lowest cost alternati...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Arizona. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Hawaii. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Connecticut. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Life-cycle environmental inventory of passenger transportation modes in the United States
NASA Astrophysics Data System (ADS)
Chester, Mikhail Vin
To appropriately mitigate environmental impacts from transportation, it is necessary for decision makers to consider the life-cycle energy consumption and emissions associated with each mode. A life-cycle energy, greenhouse gas, and criteria air pollutant emissions inventory is created for the passenger transportation modes of automobiles, urban buses, heavy rail transit, light rail transit, and aircraft in the U.S. Each mode's inventory includes an assessment of vehicles, infrastructure, and fuel components. For each component, analysis is performed for material extraction through use and maintenance in both direct and indirect (supply chain) processes. For each mode's life-cycle components, energy inputs and emission outputs are determined. Energy inputs include electricity and petroleum-based fuels. Emission outputs include greenhouse gases (CO2, CH4, and N2O) and criteria pollutants (CO, SO2, NOx , VOCs, and PM). The inputs and outputs are normalized by vehicle lifetime, vehicle mile traveled, and passenger mile traveled. A consistent system boundary is applied to all modal inventories which captures the entire life-cycle, except for end-of-life. For each modal life-cycle component, both direct and indirect processes are included if possible. A hybrid life-cycle assessment approach is used to estimate the components in the inventories. We find that life-cycle energy inputs and emission outputs increase significantly compared to the vehicle operational phase. Life-cycle energy consumption is 39-56% larger than vehicle operation for autos, 38% for buses, 93-160% for rail, and 19-24% for air systems per passenger mile traveled. Life-cycle greenhouse gas emissions are 47-65% larger than vehicle operation for autos, 43% for buses, 39-150% for rail, and 24-31% for air systems per passenger mile traveled. The energy and greenhouse gas increases are primarily due to vehicle manufacturing and maintenance, infrastructure construction, and fuel production. For criteria air pollutants, life-cycle components often dominate total emissions and can be a magnitude larger than operational counterparts. Per passenger mile traveled, total SO2 emissions (between 350 and 460 mg) are 19-27 times larger than operational emissions as a result of electricity generation in vehicle manufacturing, infrastructure construction, and fuel production. NOx emissions increase 50-73% for automobiles, 24% for buses, 13-1300% for rail, and 19-24% for aircraft. Non-tailpipe VOCs are 27-40% of total automobile, 71-95% of rail, and 51-81% of air total emissions. Infrastructure and parking construction are major components of total PM10 emissions resulting in total emissions over three times larger than operational emissions for autos and even larger for many rail systems and aircraft (the major contributor being emissions from hot-mix asphalt plants and concrete production). Infrastructure construction and operation as well as vehicle manufacturing increase total CO emissions by 5-17 times from tailpipe performance for rail and 3-9 times for air. A case study comparing the environmental performance of metropolitan regions is presented as an application of the inventory results. The San Francisco Bay Area, Chicago, and New York City are evaluated capturing passenger transportation life-cycle energy inputs and greenhouse gas and criteria air pollutant emissions. The regions are compared between off-peak and peak travel as well as personal and public transit. Additionally, healthcare externalities are computed from vehicle emissions. It is estimated that life-cycle energy varies from 6.3 MJ/PMT in the Bay Area to 5.7 MJ/PMT in Chicago and 5.3 MJ/PMT in New York for an average trip. Life-cycle GHG emissions range from 480 g CO2e/PMT in the Bay Area to 440 g CO2e/PMT for Chicago and 410 g CO 2e/PMT in New York. CAP emissions vary depending on the pollutant with differences as large as 25% between regions. Life-cycle CAP emissions are between 11% and 380% larger than their operational counterparts. Peak travel, with typical higher riderships, does not necessarily environmentally outperform off-peak travel due to the large share of auto PMT and less than ideal operating conditions during congestion. The social costs of travel range from ¢51 (in ¢2007) per auto passenger per trip during peak in New York to ¢6 per public transit passenger per trip during peak hours in the Bay Area and New York. Average personal transit costs are around ¢30 while public transit ranges from ¢28 to ¢41. (Abstract shortened by UMI.)
The Process of Life Cycle Cost Analysis: Projecting Economic Consequences of Design Decisions
ERIC Educational Resources Information Center
AIA Journal, 1976
1976-01-01
Life-cycle cost analysis deals with both present and future costs and attempts to relate the two as a basis for making decisions. This article lays the groundwork for a better understanding of the techniques of life-cycle cost analysis. (Author/MLF)
Just in Time in Space or Space Based JIT
NASA Technical Reports Server (NTRS)
VanOrsdel, Kathleen G.
1995-01-01
Our satellite systems are mega-buck items. In today's cost conscious world, we need to reduce the overall costs of satellites if our space program is to survive. One way to accomplish this would be through on-orbit maintenance of parts on the orbiting craft. In order to accomplish maintenance at a low cost I advance the hypothesis of having parts and pieces (spares) waiting. Waiting in the sense of having something when you need it, or just-in-time. The JIT concept can actually be applied to space processes. Its definition has to be changed just enough to encompass the needs of space. Our space engineers tell us which parts and pieces the satellite systems might be needing once in orbit. These items are stored in space for the time of need and can be ready when they are needed -- or Space Based JIT. When a system has a problem, the repair facility is near by and through human or robotics intervention, it can be brought back into service. Through a JIT process, overall system costs could be reduced as standardization of parts is built into satellite systems to facilitate reduced numbers of parts being stored. Launch costs will be contained as fewer spare pieces need to be included in the launch vehicle and the space program will continue to thrive even in this era of reduced budgets. The concept of using an orbiting parts servicer and human or robotics maintenance/repair capabilities would extend satellite life-cycle and reduce system replacement launches. Reductions of this nature throughout the satellite program result in cost savings.
Analysis of the Seismic Performance of Isolated Buildings according to Life-Cycle Cost
Dang, Yu; Han, Jian-ping; Li, Yong-tao
2015-01-01
This paper proposes an indicator of seismic performance based on life-cycle cost of a building. It is expressed as a ratio of lifetime damage loss to life-cycle cost and determines the seismic performance of isolated buildings. Major factors are considered, including uncertainty in hazard demand and structural capacity, initial costs, and expected loss during earthquakes. Thus, a high indicator value indicates poor building seismic performance. Moreover, random vibration analysis is conducted to measure structural reliability and evaluate the expected loss and life-cycle cost of isolated buildings. The expected loss of an actual, seven-story isolated hospital building is only 37% of that of a fixed-base building. Furthermore, the indicator of the structural seismic performance of the isolated building is much lower in value than that of the structural seismic performance of the fixed-base building. Therefore, isolated buildings are safer and less risky than fixed-base buildings. The indicator based on life-cycle cost assists owners and engineers in making investment decisions in consideration of structural design, construction, and expected loss. It also helps optimize the balance between building reliability and building investment. PMID:25653677
Analysis of the seismic performance of isolated buildings according to life-cycle cost.
Dang, Yu; Han, Jian-Ping; Li, Yong-Tao
2015-01-01
This paper proposes an indicator of seismic performance based on life-cycle cost of a building. It is expressed as a ratio of lifetime damage loss to life-cycle cost and determines the seismic performance of isolated buildings. Major factors are considered, including uncertainty in hazard demand and structural capacity, initial costs, and expected loss during earthquakes. Thus, a high indicator value indicates poor building seismic performance. Moreover, random vibration analysis is conducted to measure structural reliability and evaluate the expected loss and life-cycle cost of isolated buildings. The expected loss of an actual, seven-story isolated hospital building is only 37% of that of a fixed-base building. Furthermore, the indicator of the structural seismic performance of the isolated building is much lower in value than that of the structural seismic performance of the fixed-base building. Therefore, isolated buildings are safer and less risky than fixed-base buildings. The indicator based on life-cycle cost assists owners and engineers in making investment decisions in consideration of structural design, construction, and expected loss. It also helps optimize the balance between building reliability and building investment.
Parking infrastructure: energy, emissions, and automobile life-cycle environmental accounting
NASA Astrophysics Data System (ADS)
Chester, Mikhail; Horvath, Arpad; Madanat, Samer
2010-07-01
The US parking infrastructure is vast and little is known about its scale and environmental impacts. The few parking space inventories that exist are typically regionalized and no known environmental assessment has been performed to determine the energy and emissions from providing this infrastructure. A better understanding of the scale of US parking is necessary to properly value the total costs of automobile travel. Energy and emissions from constructing and maintaining the parking infrastructure should be considered when assessing the total human health and environmental impacts of vehicle travel. We develop five parking space inventory scenarios and from these estimate the range of infrastructure provided in the US to be between 105 million and 2 billion spaces. Using these estimates, a life-cycle environmental inventory is performed to capture the energy consumption and emissions of greenhouse gases, CO, SO2, NOX, VOC (volatile organic compounds), and PM10 (PM: particulate matter) from raw material extraction, transport, asphalt and concrete production, and placement (including direct, indirect, and supply chain processes) of space construction and maintenance. The environmental assessment is then evaluated within the life-cycle performance of sedans, SUVs (sports utility vehicles), and pickups. Depending on the scenario and vehicle type, the inclusion of parking within the overall life-cycle inventory increases energy consumption from 3.1 to 4.8 MJ by 0.1-0.3 MJ and greenhouse gas emissions from 230 to 380 g CO2e by 6-23 g CO2e per passenger kilometer traveled. Life-cycle automobile SO2 and PM10 emissions show some of the largest increases, by as much as 24% and 89% from the baseline inventory. The environmental consequences of providing the parking spaces are discussed as well as the uncertainty in allocating paved area between parking and roadways.
Cost-effectiveness Analysis for Technology Acquisition.
Chakravarty, A; Naware, S S
2008-01-01
In a developing country with limited resources, it is important to utilize the total cost visibility approach over the entire life-cycle of the technology and then analyse alternative options for acquiring technology. The present study analysed cost-effectiveness of an "In-house" magnetic resonance imaging (MRI) scan facility of a large service hospital against outsourcing possibilities. Cost per unit scan was calculated by operating costing method and break-even volume was calculated. Then life-cycle cost analysis was performed to enable total cost visibility of the MRI scan in both "In-house" and "outsourcing of facility" configuration. Finally, cost-effectiveness analysis was performed to identify the more acceptable decision option. Total cost for performing unit MRI scan was found to be Rs 3,875 for scans without contrast and Rs 4,129 with contrast. On life-cycle cost analysis, net present value (NPV) of the "In-house" configuration was found to be Rs-(4,09,06,265) while that of "outsourcing of facility" configuration was Rs-(5,70,23,315). Subsequently, cost-effectiveness analysis across eight Figures of Merit showed the "In-house" facility to be the more acceptable option for the system. Every decision for acquiring high-end technology must be subjected to life-cycle cost analysis.
Ferry Lifecycle Cost Model for Federal Land Management Agencies : User's Guide.
DOT National Transportation Integrated Search
2011-09-30
The Ferry Lifecycle Cost Model (model) is a spreadsheet-based sketch planning tool that estimates capital, operating, and total cost for various vessels that could be used to provide ferry service on a particular route given known service parameters....
MDOT Pavement Management System : Prediction Models and Feedback System
DOT National Transportation Integrated Search
2000-10-01
As a primary component of a Pavement Management System (PMS), prediction models are crucial for one or more of the following analyses: : maintenance planning, budgeting, life-cycle analysis, multi-year optimization of maintenance works program, and a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edwin A. Harvego; James E. O'Brien; Michael G. McKellar
2012-11-01
Results of a system evaluation and lifecycle cost analysis are presented for a commercial-scale high-temperature electrolysis (HTE) central hydrogen production plant. The plant design relies on grid electricity to power the electrolysis process and system components, and industrial natural gas to provide process heat. The HYSYS process analysis software was used to evaluate the reference central plant design capable of producing 50,000 kg/day of hydrogen. The HYSYS software performs mass and energy balances across all components to allow optimization of the design using a detailed process flow sheet and realistic operating conditions specified by the analyst. The lifecycle cost analysismore » was performed using the H2A analysis methodology developed by the Department of Energy (DOE) Hydrogen Program. This methodology utilizes Microsoft Excel spreadsheet analysis tools that require detailed plant performance information (obtained from HYSYS), along with financial and cost information to calculate lifecycle costs. The results of the lifecycle analyses indicate that for a 10% internal rate of return, a large central commercial-scale hydrogen production plant can produce 50,000 kg/day of hydrogen at an average cost of $2.68/kg. When the cost of carbon sequestration is taken into account, the average cost of hydrogen production increases by $0.40/kg to $3.08/kg.« less
Life-cycle costing: Practical considerations
NASA Technical Reports Server (NTRS)
Eisenberger, I.; Lorden, G.
1977-01-01
The history and methodology of life-cycle costing are presented and analyzed, contrasting the potential benefits of the technique with the difficulties of its application. Examples and a short survey of the literature are given.
Simplified Life-Cycle Cost Estimation
NASA Technical Reports Server (NTRS)
Remer, D. S.; Lorden, G.; Eisenberger, I.
1983-01-01
Simple method for life-cycle cost (LCC) estimation avoids pitfalls inherent in formulations requiring separate estimates of inflation and interest rates. Method depends for validity observation that interest and inflation rates closely track each other.
DOE Office of Scientific and Technical Information (OSTI.GOV)
PIERSON KL; MEINERT FL
2012-01-26
Two notable modeling efforts within the Hanford Tank Waste Operations Simulator (HTWOS) are currently underway to (1) increase the robustness of the underlying chemistry approximations through the development and implementation of an aqueous thermodynamic model, and (2) add enhanced planning capabilities to the HTWOS model through development and incorporation of the lifecycle cost model (LCM). Since even seemingly small changes in apparent waste composition or treatment parameters can result in large changes in quantities of high-level waste (HLW) and low-activity waste (LAW) glass, mission duration or lifecycle cost, a solubility model that more accurately depicts the phases and concentrations ofmore » constituents in tank waste is required. The LCM enables evaluation of the interactions of proposed changes on lifecycle mission costs, which is critical for decision makers.« less
Diaconu, Karin; Chen, Yen-Fu; Cummins, Carole; Jimenez Moyao, Gabriela; Manaseki-Holland, Semira; Lilford, Richard
2017-08-18
Forty to 70 % of medical devices and equipment in low- and middle-income countries are broken, unused or unfit for purpose; this impairs service delivery to patients and results in lost resources. Undiscerning procurement processes are at the heart of this issue. We conducted a systematic review of the literature to August 2013 with no time or language restrictions to identify what product selection or prioritization methods are recommended or used for medical device and equipment procurement planning within low- and middle-income countries. We explore the factors/evidence-base proposed for consideration within such methods and identify prioritization criteria. We included 217 documents (corresponding to 250 texts) in the narrative synthesis. Of these 111 featured in the meta-summary. We identify experience and needs-based methods used to reach procurement decisions. Equipment costs (including maintenance) and health needs are the dominant issues considered. Extracted data suggest that procurement officials should prioritize devices with low- and middle-income country appropriate technical specifications - i.e. devices and equipment that can be used given available human resources, infrastructure and maintenance capacity. Suboptimal device use is directly linked to incomplete costing and inadequate consideration of maintenance services and user training during procurement planning. Accurate estimation of life-cycle costing and careful consideration of device servicing are of crucial importance.
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Texas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Texas. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Minnesota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Minnesota. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Indiana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Indiana. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Florida
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Florida. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Maine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Maine. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Vermont
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Vermont. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Michigan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Michigan. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Alabama
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Alabama. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of New Hampshire
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of New Hampshire. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of New Mexico. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Colorado. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Washington
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Washington. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Montana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Montana. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the District of Columbia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the District of Columbia. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Massachusetts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Massachusetts. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Oregon
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Oregon. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Wisconsin
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Wisconsin. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Ohio
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Ohio. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of South Carolina
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of South Carolina. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of North Carolina
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of North Carolina. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Iowa
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Iowa. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Armstrong, Peter R.; Sullivan, Gregory P.; Parker, Graham B.
2006-03-31
As part of a larger program targeting the market transformation of packaged rooftop air conditioning, five high-efficiency rooftop air conditioning products were selected in 2002 by the U.S. Department of Energy (DOE) under the Unitary Air Conditioner (UAC) Technology Procurement (http://www.pnl.gov/uac). In February 2003, Fort Gordon in Augusta, Georgia was chosen as the demonstration site. With the goal of validating the field performance and operation of one of the awarded products, a 10-ton high-efficiency packaged rooftop unit (RTU) manufactured by Global Energy Group (GEG) was installed at Fort Gordon in October 2003. Following equipment installation, power metering, air- and refrigerant-sidemore » instrumentation was installed on the GEG RTU and a 4-year old typical-efficiency 20-ton RTU manufactured by AAON . The GEG and AAON units were instrumented identically and operated May through July, 2005, to observe performance under a range of conditions. Based on the data collected as part of this demonstration, the GEG equipment performed at least 8% better in stage-1 (single compressor running) cooling and at least 16% better in stage-2 (both compressors running) than the baseline AAON equipment. Performance comparisons are based on what we call application EER normalized to equivalent specific fan power. The full-load, specific-fan-power-normalized application EERs at ARI design conditions were 10.48 Btu/Wh for the GEG and 9.00 Btu/Wh for the baseline machine. With a cost premium of nearly 50%, and slightly higher maintenance costs, the life-cycle cost analysis shows that the GEG technology pays for itself--a positive net-present value (NPV)--only in climates and buildings with long cooling seasons. Manufacture of this equipment on a larger scale can be expected to reduce costs to the point where it is more broadly cost-effective. The assumed 10-ton baseline and new-technology unit costs are $3824.00 and $5525.00 respectively. If the new technology cost is assumed to drop as sales increase to $4674.50 for a 10-ton unit (i.e. the original cost difference is halved), the life-cycle costs improve. A grid of first cost, annual maintenance cost and electricity price is enumerated and the results presented in the report show the sensitivity of life cycle cost to these three financial parameters in each of eight different climates.« less
DOT National Transportation Integrated Search
2013-09-01
This report surveys the state-of-practice of transit railcar maintenance management and fleet management practices. It emphasizes a lifecycle management approach to fleet management. It also emphasizes the role of performance improvement programs and...
10 CFR 455.63 - Cost-effectiveness testing.
Code of Federal Regulations, 2013 CFR
2013-01-01
... measure to be determined by life-cycle cost analysis or if the applicant requests such an analysis. (1) A life-cycle cost analysis, showing a savings-to-investment ratio greater than or equal to one over the useful life of the energy conservation measure or 15 years, whichever is less, shall be conducted in...
10 CFR 455.63 - Cost-effectiveness testing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... measure to be determined by life-cycle cost analysis or if the applicant requests such an analysis. (1) A life-cycle cost analysis, showing a savings-to-investment ratio greater than or equal to one over the useful life of the energy conservation measure or 15 years, whichever is less, shall be conducted in...
10 CFR 455.63 - Cost-effectiveness testing.
Code of Federal Regulations, 2014 CFR
2014-01-01
... measure to be determined by life-cycle cost analysis or if the applicant requests such an analysis. (1) A life-cycle cost analysis, showing a savings-to-investment ratio greater than or equal to one over the useful life of the energy conservation measure or 15 years, whichever is less, shall be conducted in...
A Sensitivity Analysis of the Rigid Pavement Life-Cycle Cost Analysis Program
DOT National Transportation Integrated Search
2000-12-01
Original Report Date: September 1999. This report describes the sensitivity analysis performed on the Rigid Pavement Life-Cycle Cost Analysis program, a computer program developed by the Center for Transportation Research for the Texas Department of ...
Life-Cycle Costing of Food Waste Management in Denmark: Importance of Indirect Effects.
Martinez-Sanchez, Veronica; Tonini, Davide; Møller, Flemming; Astrup, Thomas Fruergaard
2016-04-19
Prevention has been suggested as the preferred food waste management solution compared to alternatives such as conversion to animal fodder or to energy. In this study we used societal life-cycle costing, as a welfare economic assessment, and environmental life-cycle costing, as a financial assessment combined with life-cycle assessment, to evaluate food waste management. Both life-cycle costing assessments included direct and indirect effects. The latter are related to income effects, accounting for the marginal consumption induced when alternative scenarios lead to different household expenses, and the land-use-changes effect, associated with food production. The results highlighted that prevention, while providing the highest welfare gains as more services/goods could be consumed with the same income, could also incur the highest environmental impacts if the monetary savings from unpurchased food commodities were spent on goods/services with a more environmentally damaging production than that of the (prevented) food. This was not the case when savings were used, e.g., for health care, education, and insurances. This study demonstrates that income effects, although uncertain, should be included whenever alternative scenarios incur different financial costs. Furthermore, it highlights that food prevention measures should not only demote the purchase of unconsumed food but also promote a low-impact use of the savings generated.
NASA Technical Reports Server (NTRS)
Borden, C. S.; Volkmer, K.; Cochrane, E. H.; Lawson, A. C.
1984-01-01
A simple methodology to estimate photovoltaic system size and life-cycle costs in stand-alone applications is presented. It is designed to assist engineers at Government agencies in determining the feasibility of using small stand-alone photovoltaic systems to supply ac or dc power to the load. Photovoltaic system design considerations are presented as well as the equations for sizing the flat-plate array and the battery storage to meet the required load. Cost effectiveness of a candidate photovoltaic system is based on comparison with the life-cycle cost of alternative systems. Examples of alternative systems addressed are batteries, diesel generators, the utility grid, and other renewable energy systems.
Time-Dependent Topology of Railway Prestressed Concrete Sleepers
NASA Astrophysics Data System (ADS)
Li, Dan; Ngamkhanong, Chayut; Kaewunruen, Sakdirat
2017-10-01
The railway sleepers are very important component of railway track structure. The sleepers can be manufactured by using timber, concrete, steel or other engineered materials. Nowadays, prestressed concrete has become most commonly used type of sleepers. Prestressed concrete sleepers have longer life-cycle and lower maintenance cost than reinforced concrete sleepers. They are expected to withstand high dynamic loads and harsh environments. However, durability and long-term performance of prestressed concrete sleepers are largely dependent on creep and shrinkage responses. This study investigates the long-term behaviours of prestressed concrete sleepers and proposes the shortening and deflection diagrams. Comparison between design codes of Eurocode 2 and AS3600-2009 provides the insight into the time-dependent performance of prestressed concrete sleepers. The outcome of this paper will improve the rail maintenance and inspection criteria in order to establish appropriate sensible remote track condition monitor network in practice.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shonder, John A; Hughes, Patrick; Atkin, Erica
2006-11-01
A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipmentmore » prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.« less
Life-Cycle Cost/Benefit Assessment of Expedite Departure Path (EDP)
NASA Technical Reports Server (NTRS)
Wang, Jianzhong Jay; Chang, Paul; Datta, Koushik
2005-01-01
This report presents a life-cycle cost/benefit assessment (LCCBA) of Expedite Departure Path (EDP), an air traffic control Decision Support Tool (DST) currently under development at NASA. This assessment is an update of a previous study performed by bd Systems, Inc. (bd) during FY01, with the following revisions: The life-cycle cost assessment methodology developed by bd for the previous study was refined and calibrated using Free Flight Phase 1 (FFP1) cost information for Traffic Management Advisor (TMA, or TMA-SC in the FAA's terminology). Adjustments were also made to the site selection and deployment scheduling methodology to include airspace complexity as a factor. This technique was also applied to the benefit extrapolation methodology to better estimate potential benefits for other years, and at other sites. This study employed a new benefit estimating methodology because bd s previous single year potential benefit assessment of EDP used unrealistic assumptions that resulted in optimistic estimates. This methodology uses an air traffic simulation approach to reasonably predict the impacts from the implementation of EDP. The results of the costs and benefits analyses were then integrated into a life-cycle cost/benefit assessment.
LED street lighting evaluation -- phase II : LED specification and life-cycle cost analysis.
DOT National Transportation Integrated Search
2015-01-01
Phase II of this study focused on developing a draft specification for LED luminaires to be used by IDOT : and a life-cycle cost analysis (LCCA) tool for solid state lighting technologies. The team also researched the : latest developments related to...
NASA Technical Reports Server (NTRS)
Remer, D. S.
1977-01-01
The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.
NASA Technical Reports Server (NTRS)
Hammond, Wesley; Thurston, Marland; Hood, Christopher
1995-01-01
The Titan 4 Space Launch Vehicle Program is one of many major weapon system programs that have modified acquisition plans and operational procedures to meet new, stringent environmental rules and regulations. The Environmental Protection Agency (EPA) and the Department of Defense (DOD) mandate to reduce the use of ozone depleting chemicals (ODC's) is just one of the regulatory changes that has affected the program. In the last few years, public environmental awareness, coupled with stricter environmental regulations, has created the need for DOD to produce environmental life-cycle cost estimates (ELCCE) for every major weapon system acquisition program. The environmental impact of the weapon system must be assessed and budgeted, considering all costs, from cradle to grave. The Office of the Secretary of Defense (OSD) has proposed that organizations consider Conservation, Cleanup, Compliance and Pollution Prevention (C(sup 3)P(sup 2)) issues associated with each acquisition program to assess life-cycle impacts and costs. The Air Force selected the Titan 4 system as the pilot program for estimating life-cycle environmental costs. The estimating task required participants to develop an ELCCE methodology, collect data to test the methodology and produce a credible cost estimate within the DOD C(sup 3)P(sup 2) definition. The estimating methodology included using the Program Office weapon system description and work breakdown structure together with operational site and manufacturing plant visits to identify environmental cost drivers. The results of the Titan IV ELCCE process are discussed and expanded to demonstrate how they can be applied to satisfy any life-cycle environmental cost estimating requirement.
DOT National Transportation Integrated Search
2009-05-01
The development of life-cycle energy and emissions factors for passenger transportation modes : is critical for understanding the total environmental costs of travel. Previous life-cycle studies : have focused on the automobile given its dominating s...
Using Ada: The deeper challenges
NASA Technical Reports Server (NTRS)
Feinberg, David A.
1986-01-01
The Ada programming language and the associated Ada Programming Support Environment (APSE) and Ada Run Time Environment (ARTE) provide the potential for significant life-cycle cost reductions in computer software development and maintenance activities. The Ada programming language itself is standardized, trademarked, and controlled via formal validation procedures. Though compilers are not yet production-ready as most would desire, the technology for constructing them is sufficiently well known and understood that time and money should suffice to correct current deficiencies. The APSE and ARTE are, on the other hand, significantly newer issues within most software development and maintenance efforts. Currently, APSE and ARTE are highly dependent on differing implementer concepts, strategies, and market objectives. Complex and sophisticated mission-critical computing systems require the use of a complete Ada-based capability, not just the programming language itself; yet the range of APSE and ARTE features which must actually be utilized can vary significantly from one system to another. As a consequence, the need to understand, objectively evaluate, and select differing APSE and ARTE capabilities and features is critical to the effective use of Ada and the life-cycle efficiencies it is intended to promote. It is the selection, collection, and understanding of APSE and ARTE which provide the deeper challenges of using Ada for real-life mission-critical computing systems. Some of the current issues which must be clarified, often on a case-by-case basis, in order to successfully realize the full capabilities of Ada are discussed.
C-130 Advanced Technology Center wing box conceptual design/cost study
NASA Technical Reports Server (NTRS)
Whitehead, R. S.; Foreman, C. R.; Silva, K.
1992-01-01
A conceptual design was developed by Northrop/LTV for an advanced C-130 Center Wing Box (CWB) which could meet the severe mission requirements of the SOF C-130 aircraft. The goals for the advanced technology CWB relative to the current C-130H CWB were: (1) the same acquisition cost; (2) lower operating support costs; (3) equal or lower weight; (4) a 30,000 hour service life for the SOF mission; and (5) minimum impact on the current maintenance concept. Initially, the structural arrangement, weight, external and internal loads, fatigue spectrum, flutter envelope and design criteria for the SOF C-130 aircraft CWB were developed. An advanced materials assessment was then conducted to determine the suitability of advanced materials for a 1994 production availability and detailed trade studies were performed on candidate CWB conceptual designs. Finally, a life-cycle cost analysis was performed on the advanced CWB. The study results showed that a hybrid composite/metallic CWB could meet the severe SOF design requirements, reduce the CWB weight by 14 pct., and was cost effective relative to an all metal beefed up C-130H CWB.
Obtaining Life-Cycle Cost-Effective Facilities in the Department of Defense
2013-01-01
8 Step 3: Regional, Service- Level , and OSD Project Ranking...13 2.3. Actors and Barriers to Life-Cycle Cost-Effective Facilities in the Regional, Service- Level , and OSD Project Ranking...Congressional authorization and appropriation OMB evaluation Regional, service- level , and OSD project ranking Economic analysis and DD form 1391 completed
Sizing and Lifecycle Cost Analysis of an Ares V Composite Interstage
NASA Technical Reports Server (NTRS)
Mann, Troy; Smeltzer, Stan; Grenoble, Ray; Mason, Brian; Rosario, Sev; Fairbairn, Bob
2012-01-01
The Interstage Element of the Ares V launch vehicle was sized using a commercially available structural sizing software tool. Two different concepts were considered, a metallic design and a composite design. Both concepts were sized using similar levels of analysis fidelity and included the influence of design details on each concept. Additionally, the impact of the different manufacturing techniques and failure mechanisms for composite and metallic construction were considered. Significant details were included in analysis models of each concept, including penetrations for human access, joint connections, as well as secondary loading effects. The designs and results of the analysis were used to determine lifecycle cost estimates for the two Interstage designs. Lifecycle cost estimates were based on industry provided cost data for similar launch vehicle components. The results indicated that significant mass as well as cost savings are attainable for the chosen composite concept as compared with a metallic option.
Bridge maintenance to enhance corrosion resistance and performance of steel girder bridges
NASA Astrophysics Data System (ADS)
Moran Yanez, Luis M.
The integrity and efficiency of any national highway system relies on the condition of the various components. Bridges are fundamental elements of a highway system, representing an important investment and a strategic link that facilitates the transport of persons and goods. The cost to rehabilitate or replace a highway bridge represents an important expenditure to the owner, who needs to evaluate the correct time to assume that cost. Among the several factors that affect the condition of steel highway bridges, corrosion is identified as the main problem. In the USA corrosion is the primary cause of structurally deficient steel bridges. The benefit of regular high-pressure superstructure washing and spot painting were evaluated as effective maintenance activities to reduce the corrosion process. The effectiveness of steel girder washing was assessed by developing models of corrosion deterioration of composite steel girders and analyzing steel coupons at the laboratory under atmospheric corrosion for two alternatives: when high-pressure washing was performed and when washing was not considered. The effectiveness of spot painting was assessed by analyzing the corrosion on steel coupons, with small damages, unprotected and protected by spot painting. A parametric analysis of corroded steel girder bridges was considered. The emphasis was focused on the parametric analyses of corroded steel girder bridges under two alternatives: (a) when steel bridge girder washing is performed according to a particular frequency, and (b) when no bridge washing is performed to the girders. The reduction of structural capacity was observed for both alternatives along the structure service life, estimated at 100 years. An economic analysis, using the Life-Cycle Cost Analysis method, demonstrated that it is more cost-effective to perform steel girder washing as a scheduled maintenance activity in contrast to the no washing alternative.
Advanced Extremely High Frequency Satellite (AEHF)
2015-12-01
control their tactical and strategic forces at all levels of conflict up to and including general nuclear war, and it supports the attainment of...10195.1 10622.2 Confidence Level Confidence Level of cost estimate for current APB: 50% The ICE) that supports the AEHF SV 1-4, like all life-cycle cost...mathematically the precise confidence levels associated with life-cycle cost estimates prepared for MDAPs. Based on the rigor in methods used in building
Framework and implementation of a continuous network-wide health monitoring system for roadways
NASA Astrophysics Data System (ADS)
Wang, Ming; Birken, Ralf; Shahini Shamsabadi, Salar
2014-03-01
According to the 2013 ASCE report card America's infrastructure scores only a D+. There are more than four million miles of roads (grade D) in the U.S. requiring a broad range of maintenance activities. The nation faces a monumental problem of infrastructure management in the scheduling and implementation of maintenance and repair operations, and in the prioritization of expenditures within budgetary constraints. The efficient and effective performance of these operations however is crucial to ensuring roadway safety, preventing catastrophic failures, and promoting economic growth. There is a critical need for technology that can cost-effectively monitor the condition of a network-wide road system and provide accurate, up-to-date information for maintenance activity prioritization. The Versatile Onboard Traffic Embedded Roaming Sensors (VOTERS) project provides a framework and the sensing capability to complement periodical localized inspections to continuous network-wide health monitoring. Research focused on the development of a cost-effective, lightweight package of multi-modal sensor systems compatible with this framework. An innovative software infrastructure is created that collects, processes, and evaluates these large time-lapse multi-modal data streams. A GIS-based control center manages multiple inspection vehicles and the data for further analysis, visualization, and decision making. VOTERS' technology can monitor road conditions at both the surface and sub-surface levels while the vehicle is navigating through daily traffic going about its normal business, thereby allowing for network-wide frequent assessment of roadways. This deterioration process monitoring at unprecedented time and spatial scales provides unique experimental data that can be used to improve life-cycle cost analysis models.
RT-Syn: A real-time software system generator
NASA Technical Reports Server (NTRS)
Setliff, Dorothy E.
1992-01-01
This paper presents research into providing highly reusable and maintainable components by using automatic software synthesis techniques. This proposal uses domain knowledge combined with automatic software synthesis techniques to engineer large-scale mission-critical real-time software. The hypothesis centers on a software synthesis architecture that specifically incorporates application-specific (in this case real-time) knowledge. This architecture synthesizes complex system software to meet a behavioral specification and external interaction design constraints. Some examples of these external constraints are communication protocols, precisions, timing, and space limitations. The incorporation of application-specific knowledge facilitates the generation of mathematical software metrics which are used to narrow the design space, thereby making software synthesis tractable. Success has the potential to dramatically reduce mission-critical system life-cycle costs not only by reducing development time, but more importantly facilitating maintenance, modifications, and extensions of complex mission-critical software systems, which are currently dominating life cycle costs.
Improving Life-Cycle Cost Management of Spacecraft Missions
NASA Technical Reports Server (NTRS)
Clardy, Dennon
2010-01-01
This presentation will explore the results of a recent NASA Life-Cycle Cost study and how project managers can use the findings and recommendations to improve planning and coordination early in the formulation cycle and avoid common pitfalls resulting in cost overruns. The typical NASA space science mission will exceed both the initial estimated and the confirmed life-cycle costs by the end of the mission. In a fixed-budget environment, these overruns translate to delays in starting or launching future missions, or in the worst case can lead to cancelled missions. Some of these overruns are due to issues outside the control of the project; others are due to the unpredictable problems (unknown unknowns) that can affect any development project. However, a recent study of life-cycle cost growth by the Discovery and New Frontiers Program Office identified a number of areas that are within the scope of project management to address. The study also found that the majority of the underlying causes for cost overruns are embedded in the project approach during the formulation and early design phases, but the actual impacts typically are not experienced until late in the project life cycle. Thus, project management focus in key areas such as integrated schedule development, management structure and contractor communications processes, heritage and technology assumptions, and operations planning, can be used to validate initial cost assumptions and set in place management processes to avoid the common pitfalls resulting in cost overruns.
NASA Technical Reports Server (NTRS)
Kubo, I.
1987-01-01
Bottoming cycle concepts for heavy duty transport engine applications were studied. In particular, the following tasks were performed: (1) conceptual design and cost data development for Stirling systems; (2) life-cycle cost evaluation of three bottoming systems - organic Rankine, steam Rankine, and Stirling cycles; and (3) assessment of future directions in waste heat utilization research. Variables considered for the second task were initial capital investments, fuel savings, depreciation tax benefits, salvage values, and service/maintenance costs. The study shows that none of the three bottoming systems studied are even marginally attractive. Manufacturing costs have to be reduced by at least 65%. As a new approach, an integrated Rankine/Diesel system was proposed. It utilizes one of the diesel cylinders as an expander and capitalizes on the in-cylinder heat energy. The concept eliminates the need for the power transmission device and a sophisticated control system, and reduces the size of the exhaust evaporator. Results of an economic evaluation indicate that the system has the potential to become an attractive package for end users.
NASA Technical Reports Server (NTRS)
Nall, Mark E.
2006-01-01
Integrated Vehicle Health Management (IVHM) systems have been pursued as highly integrated systems that include smart sensors, diagnostic and prognostics software for assessments of real-time and life-cycle vehicle health information. Inclusive to such a system is the requirement to monitor the environmental health within the vehicle and the occupants of the vehicle. In this regard an enterprise approach to informatics is used to develop a methodology entitled, Comprehensive Environmental Informatics System (CEIS). The hardware and software technologies integrated into this system will be embedded in the vehicle subsystems, and maintenance operations, to provide both real-time and life-cycle health information of the environment within the vehicle cabin and of its occupants. This comprehensive information database will enable informed decision making and logistics management. One key element of the CEIS is interoperability for data acquisition and archive between environment and human system monitoring. With comprehensive components the data acquired in this system will use model based reasoning systems for subsystem and system level managers, advanced on-board and ground-based mission and maintenance planners to assess system functionality. Knowledge databases of the vehicle health state will be continuously updated and reported for critical failure modes, and routinely updated and reported for life cycle condition trending. Sufficient intelligence, including evidence-based engineering practices which are analogous to evidencebased medicine practices, will be included in the CEIS to result in more rapid recognition of off-nominal operation to enable quicker corrective actions. This will result from better information (rather than just data) for improved crew/operator situational awareness, which will produce significant vehicle and crew safety improvements, as well as increasing the chance for mission success, future mission planning as well as training. Other benefits include improved reliability, increase safety in operations and cost of operations. The cost benefits stem from significantly reduced processing and operations manpower, predictive maintenance for systems and subjects. The improvements in vehicle functionality and cost will result from increased prognostic and diagnostic capability due to the detailed total human exploration system health knowledge from CEIS. A collateral benefit is that there will be closer observations of the vehicle occupants as wrist watch sized devices are worn for continuous health monitoring. Additional database acquisition will stem from activities in countermeasure practices to ensure peak performance capability by occupants of the vehicle. The CEIS will provide data from advanced sensing technologies and informatics modeling which will be useful in problem troubleshooting, and improving NASA s awareness of systems during operation.
Single-stage-to-orbit versus two-stage-two-orbit: A cost perspective
NASA Astrophysics Data System (ADS)
Hamaker, Joseph W.
1996-03-01
This paper considers the possible life-cycle costs of single-stage-to-orbit (SSTO) and two-stage-to-orbit (TSTO) reusable launch vehicles (RLV's). The analysis parametrically addresses the issue such that the preferred economic choice comes down to the relative complexity of the TSTO compared to the SSTO. The analysis defines the boundary complexity conditions at which the two configurations have equal life-cycle costs, and finally, makes a case for the economic preference of SSTO over TSTO.
2013-08-30
50 APPENDIX B. AIRCRAFT AND SHIP MAINTANANCE BUDGET .......................... 54 LIST OF REFERENCES...injected into the mold, resulting in a product. AM industry is a growing industry with many companies that offer differing processes for a variety of...markets. Table 3 shows the different processes, examples of ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ã= dê~Çì~íÉ=pÅÜççä=çÑ=_ìëáåÉëë=C=mìÄäáÅ=mçäáÅó - 13 - k~î~ä
Military utility of very large airplanes and alternative fuels
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mikolowsky, W.T.; Noggle, L.W.; Stanley, W.L.
1977-09-01
Synthetic chemical fuels and nuclear fuels were evaluated for use in very large airplanes (VLA's). Candidate fuels included synthetic jet fuel, liquid hydrogen, liquid methane, methanol, ethanol, ammonia, and gasoline. Airplane life-cycle costs and life-cycle energy consumption are estimated, and energy and cost effectiveness are evaluated. It is concluded that a synthetic conventional hydrocarbon jet fuel remains the most attractive for military aircraft. (PMA)
A Life-Cycle Assessment of Biofuels: Tracing Energy and Carbon through a Fuel-Production System
ERIC Educational Resources Information Center
Krauskopf, Sara
2010-01-01
A life-cycle assessment (LCA) is a tool used by engineers to make measurements of net energy, greenhouse gas production, water consumption, and other items of concern. This article describes an activity designed to walk students through the qualitative part of an LCA. It asks them to consider the life-cycle costs of ethanol production, in terms of…
The Rapid Transit System That Achieves Higher Performance with Lower Life-Cycle Costs
NASA Astrophysics Data System (ADS)
Sone, Satoru; Takagi, Ryo
In the age of traction system made of inverter and ac traction motors, distributed traction system with pure electric brake of regenerative mode has been recognised very advantageous. This paper proposes a new system as the lowest life-cycle cost system for high performance rapid transit, a new architecture and optimum parameters of power feeding system, and a new running method of trains. In Japan, these components of this proposal, i.e. pure electric brake and various countermeasures of reducing loss of regeneration have been already popular but not as yet the new running method for better utilisation of the equipment and for lower life-cycle cost. One example of what are proposed in this paper will be made as Tsukuba Express, which is under construction as the most modern commuter railway in Greater Tokyo area.
The Life-Cycle Costs of School Water, Sanitation and Hygiene Access in Kenyan Primary Schools
Alexander, Kelly T.; Mwaki, Alex; Adhiambo, Dorothy; Cheney-Coker, Malaika; Muga, Richard; Freeman, Matthew C.
2016-01-01
Water, Sanitation and Hygiene (WASH) programs in schools can increase the health, dignity and comfort of students and teachers. Understanding the costs of WASH facilities and services in schools is one essential piece for policy makers to utilize when budgeting for schools and helping to make WASH programs more sustainable. In this study we collected data from NGO and government offices, local hardware shops and 89 rural primary schools across three Kenyan counties. Current expenditures on WASH, from school and external (NGO, government, parent) sources, averaged 1.83 USD per student per year. After reviewing current expenditures, estimated costs of operations and maintenance for bringing schools up to basic WASH standards, were calculated to be 3.03 USD per student per year. This includes recurrent costs, but not the cost of installing or setting up WASH infrastructure, which was 18,916 USD per school, for a school of 400 students (4.92 USD per student, per year). These findings demonstrate the need for increases in allocations to schools in Kenya, and stricter guidance on how money should be spent on WASH inputs to enable all schools to provide basic WASH for all students. PMID:27355962
The Life-Cycle Costs of School Water, Sanitation and Hygiene Access in Kenyan Primary Schools.
Alexander, Kelly T; Mwaki, Alex; Adhiambo, Dorothy; Cheney-Coker, Malaika; Muga, Richard; Freeman, Matthew C
2016-06-27
Water, Sanitation and Hygiene (WASH) programs in schools can increase the health, dignity and comfort of students and teachers. Understanding the costs of WASH facilities and services in schools is one essential piece for policy makers to utilize when budgeting for schools and helping to make WASH programs more sustainable. In this study we collected data from NGO and government offices, local hardware shops and 89 rural primary schools across three Kenyan counties. Current expenditures on WASH, from school and external (NGO, government, parent) sources, averaged 1.83 USD per student per year. After reviewing current expenditures, estimated costs of operations and maintenance for bringing schools up to basic WASH standards, were calculated to be 3.03 USD per student per year. This includes recurrent costs, but not the cost of installing or setting up WASH infrastructure, which was 18,916 USD per school, for a school of 400 students (4.92 USD per student, per year). These findings demonstrate the need for increases in allocations to schools in Kenya, and stricter guidance on how money should be spent on WASH inputs to enable all schools to provide basic WASH for all students.
Main propulsion system design recommendations for an advanced Orbit Transfer Vehicle
NASA Technical Reports Server (NTRS)
Redd, L.
1985-01-01
Various main propulsion system configurations of an advanced OTV are evaluated with respect to the probability of nonindependent failures, i.e., engine failures that disable the entire main propulsion system. Analysis of the life-cycle cost (LCC) indicates that LCC is sensitive to the main propulsion system reliability, vehicle dry weight, and propellant cost; it is relatively insensitive to the number of missions/overhaul, failures per mission, and EVA and IVA cost. In conclusion, two or three engines are recommended in view of their highest reliability, minimum life-cycle cost, and fail operational/fail safe capability.
Toward an Improved Method of HSI Evaluation in Defense Acquisition
2006-12-01
29 C. AN EXAMPLE: EXPRESSING THE DOMAINS OF HSI IN TERMS OF LIFE-CYCLE COSTS ................................................................... 30...Edit Parameter’ (A) and ‘Edit Interaction’ (B). . 38 Figure 13. HSI slider tool concept (From http://Kn.gd- ais.com/ASPs/ eLearning /HSI_Sliders...focusing on the human element of a system is the most likely method for increasing system performance and reducing system life-cycle costs (Booher
Carbon footprint estimator, phase II : volume II - technical appendices.
DOT National Transportation Integrated Search
2014-03-01
The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...
Carbon footprint estimator, phase II : volume I - GASCAP model.
DOT National Transportation Integrated Search
2014-03-01
The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...
Medendorp, Joseph; Bric, John; Connelly, Greg; Tolton, Kelly; Warman, Martin
2015-08-10
The purpose of this manuscript is to present the intended use and long-term maintenance strategy of an online laser diffraction particle size method used for process control in a spray drying process. A Malvern Insitec was used for online particle size measurements and a Malvern Mastersizer was used for offline particle size measurements. The two methods were developed in parallel with the Mastersizer serving as the reference method. Despite extensive method development across a range of particle sizes, the two instruments demonstrated different sensitivities to material and process changes over the product lifecycle. This paper will describe the procedure used to ensure consistent alignment of the two methods, thus allowing for continued use of online real-time laser diffraction as a surrogate for the offline system over the product lifecycle. Copyright © 2015 Elsevier B.V. All rights reserved.
14 CFR 170.23 - LORAN-C establishment criteria.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ratio of the present value of the LORAN-C life-cycle benefits (PVB) to the present value of LORAN-C life-cycle costs (PVC): PVB/PVC ≥ 1.0 (c) The criteria do not cover all situations that may arise and are not...
14 CFR 170.23 - LORAN-C establishment criteria.
Code of Federal Regulations, 2013 CFR
2013-01-01
... ratio of the present value of the LORAN-C life-cycle benefits (PVB) to the present value of LORAN-C life-cycle costs (PVC): PVB/PVC ≥ 1.0 (c) The criteria do not cover all situations that may arise and are not...
Comparative Lifecycle Energy Analysis: Theory and Practice.
ERIC Educational Resources Information Center
Morris, Jeffrey; Canzoneri, Diana
1992-01-01
Explores the position that more energy is conserved through recycling secondary materials than is generated from municipal solid waste incineration. Discusses one component of a lifecycle analysis--a comparison of energy requirements for manufacturing competing products. Includes methodological issues, energy cost estimates, and difficulties…
Code of Federal Regulations, 2010 CFR
2010-10-01
... delivered to DoD that will enhance logistics, contracting, and financial business transactions supporting... on leading practices and embraces open standards, DoD can— (a) Achieve lower life-cycle cost of item management and improve life-cycle property management; (b) Improve operational readiness; (c) Provide...
A comprehensive methodology for intelligent systems life-cycle cost modelling
NASA Technical Reports Server (NTRS)
Korsmeyer, David J.; Lum, Henry, Jr.
1993-01-01
As NASA moves into the last part on the twentieth century, the desire to do 'business as usual' has been replaced with the mantra 'faster, cheaper, better'. Recently, new work has been done to show how the implementation of advanced technologies, such as intelligent systems, will impact the cost of a system design or in the operational cost for a spacecraft mission. The impact of the degree of autonomous or intelligent systems and human participation on a given program is manifested most significantly during the program operational phases, while the decision of who performs what tasks, and how much automation is incorporated into the system are all made during the design and development phases. Employing intelligent systems and automation is not an either/or question, but one of degree. The question is what level of automation and autonomy will provide the optimal trade-off between performance and cost. Conventional costing methodologies, however, are unable to show the significance of technologies like these in terms of traceable cost benefits and reductions in the various phases of the spacecraft's lifecycle. The proposed comprehensive life-cycle methodology can address intelligent system technologies as well as others that impact human-machine operational modes.
Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic
NASA Astrophysics Data System (ADS)
Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan
2017-10-01
Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... on leading practices and embraces open standards, DoD can— (a) Achieve lower life-cycle cost of item management and improve life-cycle property management; (b) Improve operational readiness; (c) Provide reliable accountability of property and asset visibility throughout the life cycle; and (d) Reduce the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... on leading practices and embraces open standards, DoD can— (a) Achieve lower life-cycle cost of item management and improve life-cycle property management; (b) Improve operational readiness; (c) Provide reliable accountability of property and asset visibility throughout the life cycle; and (d) Reduce the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... on leading practices and embraces open standards, DoD can— (a) Achieve lower life-cycle cost of item management and improve life-cycle property management; (b) Improve operational readiness; (c) Provide reliable accountability of property and asset visibility throughout the life cycle; and (d) Reduce the...
Roof Moisture Surveys: Current State Of The Technology
NASA Astrophysics Data System (ADS)
Tobiasson, Wayne
1983-03-01
Moisture is the big enemy of compact roofing systems. Non-destructive nuclear, capacitance and infrared methods can all find wet insulation in such roofs but a few core samples are needed for verification. Nuclear and capacitance surveys generate quantitative results at grid points but examine only a small portion of the roof. Quantitative results are not usually provided by infrared scanners but they can rapidly examine every square inch of the roof. Being able to find wet areas when they are small is an important advantage. Prices vary with the scope of the investigation. For a particular scope, the three techniques are often cost-competitive. The limitations of each technique are related to the people involved as well as the equipment. When the right people are involved, non-destructive surveys are a very effective method for improving the long-term performance and reducing the life-cycle costs of roofing systems. Plans for the maintenance, repair or replacement of a roof should include a roof moisture survey.
Recent developments in nickel hydrogen technology
NASA Astrophysics Data System (ADS)
Beauchamp, R. L.; Dunlop, J. D.
1988-05-01
A program to design and develop a multikilowatt-hour nickel hydrogen battery for storing electricity from photovoltaic or other power sources is continuing under a cost sharing contract with Sandia National Laboratories. The challenge has been to dramatically reduce the first cost of the battery to make it economically competitive, on a life-cycle cost basis, with other energy storage batteries used in terrestrial applications. The advantages offered by nickel hydrogen batteries are: (1) long cycle life, (2) no maintenance, and (3) a high tolerance to abuse. The last being the most important, implying that there is no need for a charge controller between the solar array and the battery. This would have a beneficial effect on the installation's long term reliability and cost. It also means that one can take full advantage of the maximum output of the solar array, in contrast to systems where the controller isolates the battery during times of maximum insolation. Couple this to the battery's excellent energy efficiency and there can be a significant reduction in the size of the array. In addition, since the state-of-charge is directly related to pressure, the battery can be used as a load management system.
Integrated Life-Cycle Framework for Maintenance, Monitoring and Reliability of Naval Ship Structures
2012-08-15
number of times, a fast and accurate method for analyzing the ship hull is required. In order to obtain this required computational speed and accuracy...Naval Engineers Fleet Maintenance & Modernization Symposium (FMMS 2011) [8] and the Eleventh International Conference on Fast Sea Transportation ( FAST ...probabilistic strength of the ship hull. First, a novel deterministic method for the fast and accurate calculation of the strength of the ship hull is
Solar power satellite life-cycle energy recovery consideration
NASA Astrophysics Data System (ADS)
Weingartner, S.; Blumenberg, J.
The construction, in-orbit installation and maintenance of a solar power satellite (SPS) will demand large amounts of energy. As a minimum requirement for an energy effective power satellite it is asked that this amount of energy be recovered. The energy effectiveness in this sense resulting in a positive net energy balance is a prerequisite for cost-effective power satellite. This paper concentrates on life-cycle energy recovery instead on monetary aspects. The trade-offs between various power generation systems (different types of solar cells, solar dynamic), various construction and installation strategies (using terrestrial or extra-terrestrial resources) and the expected/required lifetime of the SPS are reviewed. The presented work is based on a 2-year study performed at the Technical University of Munich. The study showed that the main energy which is needed to make a solar power satellite a reality is required for the production of the solar power components (up to 65%), especially for the solar cell production. Whereas transport into orbit accounts in the order of 20% and the receiving station on earth (rectenna) requires about 15% of the total energy investment. The energetic amortization time, i.e. the time the SPS has to be operational to give back the amount of energy which was needed for its production installation and operation, is about two years.
Analysis of the Lifecycle of Mechanical Engineering Products
NASA Astrophysics Data System (ADS)
Gubaydulina, R. H.; Gruby, S. V.; Davlatov, G. D.
2016-08-01
Principal phases of the lifecycle of mechanical engineering products are analyzed in the paper. The authors have developed methods and procedures to improve designing, manufacturing, operating and recycling of the machine. It has been revealed that economic lifecycle of the product is a base for appropriate organization of mechanical engineering production. This lifecycle is calculated as a minimal sum total of consumer and producer costs. The machine construction and its manufacturing technology are interrelated through a maximal possible company profit. The products are to be recycled by their producer. Recycling should be considered as a feedback phase, necessary to make the whole lifecycle of the product a constantly functioning self-organizing system. The principles, outlined in this paper can be used as fundamentals to develop an automated PLM-system.
DOT National Transportation Integrated Search
2008-09-01
The primary objective of this study was to evaluate KDOTs pavement surfacing history and recommend : whether or not the departments life-cycle cost analysis (LCCA) procedure should include a surfacing history : component, and, if so, how the LC...
Code of Federal Regulations, 2011 CFR
2011-10-01
... produce quality systems. This includes ensuring that only necessary and cost-effective requirements are... that involve redesign of systems or subsystems. Life-cycle cost means the total cost to the Government...
Code of Federal Regulations, 2013 CFR
2013-10-01
... produce quality systems. This includes ensuring that only necessary and cost-effective requirements are... that involve redesign of systems or subsystems. Life-cycle cost means the total cost to the Government...
Deployable bamboo structure project: A building life-cycle report
NASA Astrophysics Data System (ADS)
Firdaus, Adrian; Prastyatama, Budianastas; Sagara, Altho; Wirabuana, Revian N.
2017-11-01
Bamboo is considered as a sustainable material in the world of construction, and it is vastly available in Indonesia. The general utilization of the material is increasingly frequent, however, its usage as a deployable structure-a recently-developed use of bamboo, is still untapped. This paper presents a report on a deployable bamboo structure project, covering the entire building life-cycle phase. The cycle encompasses the designing; fabrication; transportation; construction; operation and maintenance; as well as a plan for future re-use. The building is made of a configuration of the structural module, each being a folding set of bars which could be reduced in size to fit into vehicles for easy transportation. Each structural module was made of Gigantochloa apus bamboo. The fabrication, transportation, and construction phase require by a minimum of three workers. The fabrication and construction phase require three hours and fifteen minutes respectively. The building is utilized as cafeteria stands, the operation and maintenance phase started since early March 2017. The maintenance plan is scheduled on a monthly basis, focusing on the inspection of the locking mechanism element and the entire structural integrity. The building is designed to allow disassembly process so that it is reusable in the future.
Energy and life-cycle cost analysis of a six-story office building
NASA Astrophysics Data System (ADS)
Turiel, I.
1981-10-01
An energy analysis computer program, DOE-2, was used to compute annual energy use for a typical office building as originally designed and with several energy conserving design modifications. The largest energy use reductions were obtained with the incorporation of daylighting techniques, the use of double pane windows, night temperature setback, and the reduction of artificial lighting levels. A life-cycle cost model was developed to assess the cost-effectiveness of the design modifications discussed. The model incorporates such features as inclusion of taxes, depreciation, and financing of conservation investments. The energy conserving strategies are ranked according to economic criteria such as net present benefit, discounted payback period, and benefit to cost ratio.
ERIC Educational Resources Information Center
Scheideman, Dale; Dufresne, Ray
2001-01-01
Nevada's Clark County, the fastest growing school district in the nation, uses a life-cycle facilities management approach that monitors the individual components of each building on a database. The district's 10-year building program is addressing facilities infrastructure renewal, deferred maintenance, replacement, and new school construction.…
NASA Astrophysics Data System (ADS)
Pehl, Michaja; Arvesen, Anders; Humpenöder, Florian; Popp, Alexander; Hertwich, Edgar G.; Luderer, Gunnar
2017-12-01
Both fossil-fuel and non-fossil-fuel power technologies induce life-cycle greenhouse gas emissions, mainly due to their embodied energy requirements for construction and operation, and upstream CH4 emissions. Here, we integrate prospective life-cycle assessment with global integrated energy-economy-land-use-climate modelling to explore life-cycle emissions of future low-carbon power supply systems and implications for technology choice. Future per-unit life-cycle emissions differ substantially across technologies. For a climate protection scenario, we project life-cycle emissions from fossil fuel carbon capture and sequestration plants of 78-110 gCO2eq kWh-1, compared with 3.5-12 gCO2eq kWh-1 for nuclear, wind and solar power for 2050. Life-cycle emissions from hydropower and bioenergy are substantial (˜100 gCO2eq kWh-1), but highly uncertain. We find that cumulative emissions attributable to upscaling low-carbon power other than hydropower are small compared with direct sectoral fossil fuel emissions and the total carbon budget. Fully considering life-cycle greenhouse gas emissions has only modest effects on the scale and structure of power production in cost-optimal mitigation scenarios.
Chester, Mikhail V; Nahlik, Matthew J; Fraser, Andrew M; Kimball, Mindy A; Garikapati, Venu M
2013-01-01
The environmental outcomes of urban form changes should couple life-cycle and behavioral assessment methods to better understand urban sustainability policy outcomes. Using Phoenix, Arizona light rail as a case study, an integrated transportation and land use life-cycle assessment (ITLU-LCA) framework is developed to assess the changes to energy consumption and air emissions from transit-oriented neighborhood designs. Residential travel, commercial travel, and building energy use are included and the framework integrates household behavior change assessment to explore the environmental and economic outcomes of policies that affect infrastructure. The results show that upfront environmental and economic investments are needed (through more energy-intense building materials for high-density structures) to produce long run benefits in reduced building energy use and automobile travel. The annualized life-cycle benefits of transit-oriented developments in Phoenix can range from 1.7 to 230 Gg CO2e depending on the aggressiveness of residential density. Midpoint impact stressors for respiratory effects and photochemical smog formation are also assessed and can be reduced by 1.2-170 Mg PM10e and 41-5200 Mg O3e annually. These benefits will come at an additional construction cost of up to $410 million resulting in a cost of avoided CO2e at $16-29 and household cost savings.
NASA Technical Reports Server (NTRS)
Gilliam, D. P.; Powell, J. D.
2002-01-01
This paper presents a portion of an overall research project on the generation of the network security assessment instrument to aid developers in assessing and assuring the security of software in the development and maintenance lifecycles.
DOT National Transportation Integrated Search
2004-05-01
This manual provides basic instruction for using RealCost, software that was developed by the Federal Highway Administration (FHWA) to support the application of life-cycle cost analysis (LCCA) in the pavement project-level decisionmaking process. Th...
Martinez-Sanchez, Veronica; Levis, James W; Damgaard, Anders; DeCarolis, Joseph F; Barlaz, Morton A; Astrup, Thomas F
2017-03-21
The development of sustainable solid waste management (SWM) systems requires consideration of both economic and environmental impacts. Societal life-cycle costing (S-LCC) provides a quantitative framework to estimate both economic and environmental impacts, by including "budget costs" and "externality costs". Budget costs include market goods and services (economic impact), whereas externality costs include effects outside the economic system (e.g., environmental impact). This study demonstrates the applicability of S-LCC to SWM life-cycle optimization through a case study based on an average suburban U.S. county of 500 000 people generating 320 000 Mg of waste annually. Estimated externality costs are based on emissions of CO 2 , CH 4 , N 2 O, PM 2.5 , PM 10 , NO x , SO 2 , VOC, CO, NH 3 , Hg, Pb, Cd, Cr (VI), Ni, As, and dioxins. The results indicate that incorporating S-LCC into optimized SWM strategy development encourages the use of a mixed waste material recovery facility with residues going to incineration, and separated organics to anaerobic digestion. Results are sensitive to waste composition, energy mix and recycling rates. Most of the externality costs stem from SO 2 , NO x , PM 2.5 , CH 4 , fossil CO 2 , and NH 3 emissions. S-LCC proved to be a valuable tool for policy analysis, but additional data on key externality costs such as organic compounds emissions to water would improve future analyses.
A quantitative risk model for early lifecycle decision making
NASA Technical Reports Server (NTRS)
Feather, M. S.; Cornford, S. L.; Dunphy, J.; Hicks, K.
2002-01-01
Decisions made in the earliest phases of system development have the most leverage to influence the success of the entire development effort, and yet must be made when information is incomplete and uncertain. We have developed a scalable cost-benefit model to support this critical phase of early-lifecycle decision-making.
Aspect-Oriented Model-Driven Software Product Line Engineering
NASA Astrophysics Data System (ADS)
Groher, Iris; Voelter, Markus
Software product line engineering aims to reduce development time, effort, cost, and complexity by taking advantage of the commonality within a portfolio of similar products. The effectiveness of a software product line approach directly depends on how well feature variability within the portfolio is implemented and managed throughout the development lifecycle, from early analysis through maintenance and evolution. This article presents an approach that facilitates variability implementation, management, and tracing by integrating model-driven and aspect-oriented software development. Features are separated in models and composed of aspect-oriented composition techniques on model level. Model transformations support the transition from problem to solution space models. Aspect-oriented techniques enable the explicit expression and modularization of variability on model, template, and code level. The presented concepts are illustrated with a case study of a home automation system.
JOHNSON NOISE THERMOMETRY FOR DRIFT-FREE MEASUREMENTS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Britton Jr, Charles L; Ezell, N Dianne Bull; Roberts, Michael
In order for Johnson Noise Thermometry (JNT) to be beneficial to SMR designers, it must offer advantages beyond the current state-of-the-art technology. Comparisons to traditional RTDs and thermocouples will involve life-cycle costs, installation footprint, reliability, and accuracy. With JNT, there is additional equipment beyond what is required for the traditional RTD measurement. Therefore, the JNT-RTD system will involve additional complexity and this additional complexity must be justified. Operators will want to know that the measurement is reliable and trustworthy. It is also important that the sensor involve little, if any, additional ongoing maintenance work and that it has a lowmore » probability of causing any malfunction of the primary measurement channel. If these features can be successfully demonstrated, the JNT-RTD system could potentially save money and increase plant reliability.« less
Computer-aided software development process design
NASA Technical Reports Server (NTRS)
Lin, Chi Y.; Levary, Reuven R.
1989-01-01
The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.
Zheng, Caixian; Zheng, Kun; Shen, Yunming; Wu, Yunyun
2016-01-01
The content related to the quality during life-cycle in operation of medical device includes daily use, repair volume, preventive maintenance, quality control and adverse event monitoring. In view of this, the article aims at discussion on the quality evaluation method of medical devices during their life cycle in operation based on the Analytic Hierarchy Process (AHP). The presented method is proved to be effective by evaluating patient monitors as example. The method presented in can promote and guide the device quality control work, and it can provide valuable inputs to decisions about purchase of new device.
A simplified life-cycle cost comparison of various engines for small helicopter use
NASA Technical Reports Server (NTRS)
Civinskas, K. C.; Fishbach, L. M.
1974-01-01
A ten-year, life-cycle cost comparison is made of the following engines for small helicopter use: (1) simple turboshaft; (2) regenerative turboshaft; (3) compression-ignition reciprocator; (4) spark-ignited rotary; and (5) spark-ignited reciprocator. Based on a simplified analysis and somewhat approximate data, the simple turboshaft engine apparently has the lowest costs for mission times up to just under 2 hours. At 2 hours and above, the regenerative turboshaft appears promising. The reciprocating and rotary engines are less attractive, requiring from 10 percent to 80 percent more aircraft to have the same total payload capability as a given number of turbine powered craft. A nomogram was developed for estimating total costs of engines not covered in this study.
Constellation Program Life-cycle Cost Analysis Model (LCAM)
NASA Technical Reports Server (NTRS)
Prince, Andy; Rose, Heidi; Wood, James
2008-01-01
The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.
NASA Technical Reports Server (NTRS)
Armstrong, Edward; Tauer, Eric
2013-01-01
The presentation focused on describing a new dataset lifecycle policy that the NASA Physical Oceanography DAAC (PO.DAAC) has implemented for its new and current datasets to foster improved stewardship and consistency across its archive. The overarching goal is to implement this dataset lifecycle policy for all new GHRSST GDS2 datasets and bridge the mission statements from the GHRSST Project Office and PO.DAAC to provide the best quality SST data in a cost-effective, efficient manner, preserving its integrity so that it will be available and usable to a wide audience.
2009-01-01
maintenance , and modifications. Value-adding products from this domain could include sufficiency review/analysis for satisfaction of sustainment...c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 This product is part of the RAND Corporation technical...Airplanes, Military—United States— Maintenance and repair. 3. United States. Air Force—Planning. 4. Airplanes—Airworthiness. I. Title. UG1243.G429
An estimating rule for deep space station control room equipment energy costs
NASA Technical Reports Server (NTRS)
Younger, H. C.
1980-01-01
A rule is described which can be used to estimate power costs for new equipment under development, helping to reduce life-cycle costs and energy consumption by justifying design alternatives that are more costly, but more efficient.
DISPOSITION PATHS FOR ROCKY FLATS GLOVEBOXES: EVALUATING OPTIONS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lobdell, D.; Geimer, R.; Larsen, P.
2003-02-27
The Kaiser-Hill Company, LLC has the responsibility for closure activities at the Rocky Flats Environmental Technology Site (RFETS). One of the challenges faced for closure is the disposition of radiologically contaminated gloveboxes. Evaluation of the disposition options for gloveboxes included a detailed analysis of available treatment capabilities, disposal facilities, and lifecycle costs. The Kaiser-Hill Company, LLC followed several processes in determining how the gloveboxes would be managed for disposition. Currently, multiple disposition paths have been chosen to accommodate the needs of the varying styles and conditions of the gloveboxes, meet the needs of the decommissioning team, and to best managemore » lifecycle costs. Several challenges associated with developing a disposition path that addresses both the radiological and RCRA concerns as well as offering the most cost-effective solution were encountered. These challenges included meeting the radiological waste acceptance criteria of available disposal facilities, making a RCRA determination, evaluating treatment options and costs, addressing void requirements associated with disposal, and identifying packaging and transportation options. The varying disposal facility requirements affected disposition choices. Facility conditions that impacted decisions included radiological and chemical waste acceptance criteria, physical requirements, and measurement for payment options. The facility requirements also impacted onsite activities including management strategies, decontamination activities, and life-cycle cost.« less
Antenna Electronics Concept for the Next-Generation Very Large Array
NASA Astrophysics Data System (ADS)
Shillue, Bill; Jackson, James; Selina, Rob
2018-01-01
The National Radio Astronomy Observatory (NRAO) is considering the scientific potential and technical feasibility of a next-generation VLA (ngVLA) with an emphasis on thermal imaging at milliarcsecond resolution. The preliminary goals for the ngVLA are to increase both the system sensitivity and angular resolution of the VLA tenfold and to cover a frequency range of 1.2-116 GHz.The design of the antenna electronics, reference signal distribution, and data transmission systems will be construction and operations cost drivers for the facility. The electronics must achieve a high level of performance, while maintaining low operation and maintenance costs and a high level of reliability. With the size of the array, design effort on manufacturability and integration of components can lead to reduced lifecycle costs. With current uncertainty in the feasibility of wideband receivers, and advancements in digitizer technology, the architecture should be scalable to the number of receiver bands and the speed and resolution of available digitizer ICs. The focus of the presentation will be a proposed architecture for the electronics system, parameter tradeoffs within the system specification, and areas where technical advances are required when compared to existing array designs.
Water Management Planning: A Case Study at Blue Grass Army Depot
DOE Office of Scientific and Technical Information (OSTI.GOV)
Solana, Amy E.; Mcmordie, Katherine
2006-04-03
Executive Order 13123, Greening the Government Through Efficient Energy Management, mandates an aggressive policy for reducing potable water consumption at federal facilities. Implementation guid¬ance from the U.S. Department of Energy (DOE) set a requirement for each federal agency to “reduce potable water usage by implementing life cycle, cost-effective water efficiency programs that include a water management plan, and not less than four Federal Energy Management Program (FEMP) Best Manage¬ment Practices (BMPs).” The objective of this plan is to gain full compliance with Executive Order 13123 and associated DOE implementation guidance on behalf of Blue Grass Army Depot (BGAD), Richmond, Kentucky.more » In accordance with this plan, BGAD must: • Incorporate the plan as a component of the Installation energy conservation plan • Investigate the water savings potential and life-cycle cost effectiveness of the Operations and Maintenance (O&M) and retrofit/replacement options associated with the ten FEMP BMPs • Put into practice all applicable O&M options • Identify retrofit/replacement options appropriate for implementation (based upon calculation of the simple payback periods) • Establish a schedule for implementation of applicable and cost-effective retrofit/replacement options.« less
Case Study - Propane School Bus Fleets
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laughlin, M; Burnham, A.
As part of the U.S. Department of Energy’s (DOE’s) effort to deploy transportation technologies that reduce U.S. dependence on imported petroleum, this study examines five school districts, one in Virginia and four in Texas, successful use of propane school buses. These school districts used school buses equipped with the newly developed liquid propane injection system that improves vehicle performance. Some of the school districts in this study saved nearly 50% on a cost per mile basis for fuel and maintenance relative to diesel. Using Argonne National Laboratory’s Alternative Fuel Life-Cycle Environmental and Economic Transportation (AFLEET) Tool developed for the DOE’smore » Clean Cities program to help Clean Cities stakeholders estimate petroleum use, greenhouse gas (GHG) emissions, air pollutant emissions and cost of ownership of light-duty and heavy-duty vehicles, the results showed payback period ranges from 3—8 years, recouping the incremental cost of the vehicles and infrastructure. Overall, fuel economy for these propane vehicles is close to that of displaced diesel vehicles, on an energy-equivalent basis. In addition, the 110 propane buses examined demonstrated petroleum displacement, 212,000 diesel gallon equivalents per year, and GHG benefits of 770 tons per year.« less
System-of-Systems Technology-Portfolio-Analysis Tool
NASA Technical Reports Server (NTRS)
O'Neil, Daniel; Mankins, John; Feingold, Harvey; Johnson, Wayne
2012-01-01
Advanced Technology Life-cycle Analysis System (ATLAS) is a system-of-systems technology-portfolio-analysis software tool. ATLAS affords capabilities to (1) compare estimates of the mass and cost of an engineering system based on competing technological concepts; (2) estimate life-cycle costs of an outer-space-exploration architecture for a specified technology portfolio; (3) collect data on state-of-the-art and forecasted technology performance, and on operations and programs; and (4) calculate an index of the relative programmatic value of a technology portfolio. ATLAS facilitates analysis by providing a library of analytical spreadsheet models for a variety of systems. A single analyst can assemble a representation of a system of systems from the models and build a technology portfolio. Each system model estimates mass, and life-cycle costs are estimated by a common set of cost models. Other components of ATLAS include graphical-user-interface (GUI) software, algorithms for calculating the aforementioned index, a technology database, a report generator, and a form generator for creating the GUI for the system models. At the time of this reporting, ATLAS is a prototype, embodied in Microsoft Excel and several thousand lines of Visual Basic for Applications that run on both Windows and Macintosh computers.
14 CFR 170.23 - LORAN-C establishment criteria.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ratio of the present value of the LORAN-C life-cycle benefits (PVB) to the present value of LORAN-C life-cycle costs (PVC): PVB/PVC ≥ 1.0 (c) The criteria do not cover all situations that may arise and are not... acceptable for instrument flight rules operations as a result of an airport airspace analysis conducted in...
Photovoltaic design optimization for terrestrial applications
NASA Technical Reports Server (NTRS)
Ross, R. G., Jr.
1978-01-01
As part of the Jet Propulsion Laboratory's Low-Cost Solar Array Project, a comprehensive program of module cost-optimization has been carried out. The objective of these studies has been to define means of reducing the cost and improving the utility and reliability of photovoltaic modules for the broad spectrum of terrestrial applications. This paper describes one of the methods being used for module optimization, including the derivation of specific equations which allow the optimization of various module design features. The method is based on minimizing the life-cycle cost of energy for the complete system. Comparison of the life-cycle energy cost with the marginal cost of energy each year allows the logical plant lifetime to be determined. The equations derived allow the explicit inclusion of design parameters such as tracking, site variability, and module degradation with time. An example problem involving the selection of an optimum module glass substrate is presented.
Affordable In-Space Transportation
NASA Technical Reports Server (NTRS)
Curtis, L. A.; VanDyke, M. K.; Lajoie, R. M.; Woodcock, G. R.
1996-01-01
Current and proposed launch systems will provide access to low-Earth orbit (LEO), and destinations beyond LEO, but the cost of delivering payloads will preclude the use of these services by many users. To develop and encourage revolutionary commercial utilization of geosynchronous orbit (GEO) and to provide an affordable means to continue NASA space science and exploration missions, the transportation costs to in-space destinations must be reduced. The principal objective of this study was to conceptually define three to four promising approaches to in-space transportation for delivery of satellites and other payloads, 3,000- to 10,000-lb class, to GEO destinations. This study established a methodology for evaluating in-space transportation systems based on life-cycle cost. The reusable concepts seemed to fare better in the evaluation than expendable, since a major driver in the life-cycle cost was the stage production cost.
ERIC Educational Resources Information Center
Hussain, K. M., Ed.
Contents include an introduction to information systems (basic concepts and life-cycle); development of an information system (design, implementation, testing, and conversion); operation (evaluation and maintenance, quality control, and economics); and case studies of such systems at the New University of Lisbon, Bath University, Laval University…
DOT National Transportation Integrated Search
2014-03-01
The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...
Code of Federal Regulations, 2011 CFR
2011-01-01
.... IESNA means Illuminating Engineering Society of North America. Life-cycle cost means the total cost... in support of a manufacturing, industrial, or commercial process. Process loads do not include energy...
Code of Federal Regulations, 2010 CFR
2010-01-01
.... IESNA means Illuminating Engineering Society of North America. Life-cycle cost means the total cost... in support of a manufacturing, industrial, or commercial process. Process loads do not include energy...
SMART Layer and SMART Suitcase for structural health monitoring applications
NASA Astrophysics Data System (ADS)
Lin, Mark; Qing, Xinlin; Kumar, Amrita; Beard, Shawn J.
2001-06-01
Knowledge of integrity of in-service structures can greatly enhance their safety and reliability and lower structural maintenance cost. Current practices limit the extent of real-time knowledge that can be obtained from structures during inspection, are labor-intensive and thereby increase life-cycle costs. Utilization of distributed sensors integrated with the structure is a viable and cost-effective means of monitoring the structure and reducing inspection costs. Acellent Technologies is developing a novel system for actively and passively interrogating the health of a structure through an integrated network of sensors and actuators. Acellent's system comprises of SMART Layers, SMART Suitcase and diagnostic software. The patented SMART Layer is a thin dielectric film with an embedded network of distributed piezoelectric actuators/sensors that can be surface-mounted on metallic structures or embedded inside composite structures. The SMART Suitcase is a portable diagnostic unit designed with multiple sensor/actuator channels to interface with the SMART Layer, generate diagnostic signals from actuators and record measurements from the embedded sensors. With appropriate diagnostic software, Acellent's system can be used for monitoring structural condition and for detecting damage while the structures are in service. This paper enumerates on the SMART Layer and SMART Suitcase and their applicability to composite and metal structures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramsden, T.; Ruth, M.; Diakov, V.
2013-03-01
This report describes a life-cycle assessment conducted by the National Renewable Energy Laboratory (NREL) of 10 hydrogen production, delivery, dispensing, and use pathways that were evaluated for cost, energy use, and greenhouse gas (GHG) emissions. This evaluation updates and expands on a previous assessment of seven pathways conducted in 2009. This study summarizes key results, parameters, and sensitivities to those parameters for the 10 hydrogen pathways, reporting on the levelized cost of hydrogen in 2007 U.S. dollars as well as life-cycle well-to-wheels energy use and GHG emissions associated with the pathways.
Design for multipurpose use: an application of DfE concept in a developing economy
NASA Astrophysics Data System (ADS)
Dunmade, Israel
2004-12-01
Design for Environment (DfE) has been defined as the systematic integration of environmental considerations into product and process design. And it has been discovered that material and space can be saved when several functions are integrated into a single product by taking advantage of common components. In this design and development project, a multipurpose thresher was designed based on an integrated concept of design for modularity, disassembly, demanufacturing and remanufacturing. The machine can be used to thresh various types of farm produce such as rice, sorghum, cowpea and rye by changing the concave and the cylinder (threshing drum). The configuration of the machine enables access to most of the component parts without changing the tools needed for disassembly because the same type of fasteners was used. Furthermore, the functional units (the shelling unit, the separation unit and the grading unit) were assembled into modules such that only the faulty part needs to be replaced if necessary. The design was so simplified that the operator can make the changes for different uses without any difficulty. The machine has been successfully tested with a number of these products and it is scheduled for tests with other produce like corn and peanuts. The modularity of the functional unit will facilitate multi-lifecycle use of machine and/or its component parts. The uniformity of the liaisons and simplification of the configuration will reduce both the disassembly times and maintenance cost. By this integration, the material requirements for four different machines are conserved, environmental emissions that would be associated with the manufacture, transportation and disposal of four machines are eliminated while the capital requirements by farmers for machinery are reduced to about a quarter. Consequently the total lifecycle cost is kept minimum while the eco-efficiency is maximized.
Rokitta, Sebastian D; de Nooijer, Lennart J; Trimborn, Scarlett; de Vargas, Colomban; Rost, Björn; John, Uwe
2011-08-01
Coccolithophores, especially the abundant, cosmopolitan species Emiliania huxleyi (Lohmann) W. W. Hay et H. P. Mohler, are one of the main driving forces of the oceanic carbonate pump and contribute significantly to global carbon cycling, due to their ability to calcify. A recent study indicates that termination of diploid blooms by viral infection induces life-cycle transition, and speculation has arisen about the role of the haploid, noncalcifying stage in coccolithophore ecology. To explore gene expression patterns in both life-cycle stages, haploid and diploid cells of E. huxleyi (RCC 1217 and RCC 1216) were acclimated to limiting and saturating photon flux densities. Transcriptome analyses were performed to assess differential genomic expression related to different ploidy levels and acclimation light intensities. Analyses indicated that life-cycle stages exhibit different properties of regulating genome expression (e.g., pronounced gene activation and gene silencing in the diploid stage), proteome maintenance (e.g., increased turnover of proteins in the haploid stage), as well as metabolic processing (e.g., pronounced primary metabolism and motility in the haploid stage and calcification in the diploid stage). Furthermore, higher abundances of transcripts related to endocytotic and digestive machinery were observed in the diploid stage. A qualitative feeding experiment indicated that both life-cycle stages are capable of particle uptake (0.5 μm diameter) in late-stationary growth phase. Results showed that the two life-cycle stages represent functionally distinct entities that are evolutionarily shaped to thrive in the environment they typically inhabit. © 2011 Phycological Society of America.
Cost estimates and economic evaluations for conceptual LLRW disposal facility designs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baird, R.D.; Chau, N.; Breeds, C.D.
1995-12-31
Total life-cycle costs were estimated in support of the New York LLRW Siting Commission`s project to select a disposal method from four near-surface LLRW disposal methods (namely, uncovered above-grade vaults, covered above-grade vaults, below-grade vaults, and augered holes) and two mined methods (namely, vertical shaft mines and drift mines). Conceptual designs for the disposal methods were prepared and used as the basis for the cost estimates. Typical economic performance of each disposal method was assessed. Life-cycle costs expressed in 1994 dollars ranged from $ 1,100 million (for below-grade vaults and both mined disposal methods) to $2,000 million (for augered holes).more » Present values ranged from $620 million (for below-grade vaults) to $ 1,100 million (for augered holes).« less
18 CFR 4.51 - Contents of application.
Code of Federal Regulations, 2013 CFR
2013-04-01
... the total project as proposed specifying any projected changes in the costs (life-cycle costs) over the estimated financing or licensing period if the applicant takes such changes into account... lowest cost alternative source, specifying any projected changes in the cost of power from that source...
18 CFR 4.51 - Contents of application.
Code of Federal Regulations, 2011 CFR
2011-04-01
... the total project as proposed specifying any projected changes in the costs (life-cycle costs) over the estimated financing or licensing period if the applicant takes such changes into account... lowest cost alternative source, specifying any projected changes in the cost of power from that source...
18 CFR 4.51 - Contents of application.
Code of Federal Regulations, 2012 CFR
2012-04-01
... the total project as proposed specifying any projected changes in the costs (life-cycle costs) over the estimated financing or licensing period if the applicant takes such changes into account... lowest cost alternative source, specifying any projected changes in the cost of power from that source...
18 CFR 4.51 - Contents of application.
Code of Federal Regulations, 2014 CFR
2014-04-01
... the total project as proposed specifying any projected changes in the costs (life-cycle costs) over the estimated financing or licensing period if the applicant takes such changes into account... lowest cost alternative source, specifying any projected changes in the cost of power from that source...
18 CFR 4.51 - Contents of application.
Code of Federal Regulations, 2010 CFR
2010-04-01
... the total project as proposed specifying any projected changes in the costs (life-cycle costs) over the estimated financing or licensing period if the applicant takes such changes into account... lowest cost alternative source, specifying any projected changes in the cost of power from that source...
Remote Structural Health Monitoring and Advanced Prognostics of Wind Turbines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Douglas Brown; Bernard Laskowski
The prospect of substantial investment in wind energy generation represents a significant capital investment strategy. In order to maximize the life-cycle of wind turbines, associated rotors, gears, and structural towers, a capability to detect and predict (prognostics) the onset of mechanical faults at a sufficiently early stage for maintenance actions to be planned would significantly reduce both maintenance and operational costs. Advancement towards this effort has been made through the development of anomaly detection, fault detection and fault diagnosis routines to identify selected fault modes of a wind turbine based on available sensor data preceding an unscheduled emergency shutdown. Themore » anomaly detection approach employs spectral techniques to find an approximation of the data using a combination of attributes that capture the bulk of variability in the data. Fault detection and diagnosis (FDD) is performed using a neural network-based classifier trained from baseline and fault data recorded during known failure conditions. The approach has been evaluated for known baseline conditions and three selected failure modes: pitch rate failure, low oil pressure failure and a gearbox gear-tooth failure. Experimental results demonstrate the approach can distinguish between these failure modes and normal baseline behavior within a specified statistical accuracy.« less
Automated Translation of Safety Critical Application Software Specifications into PLC Ladder Logic
NASA Technical Reports Server (NTRS)
Leucht, Kurt W.; Semmel, Glenn S.
2008-01-01
The numerous benefits of automatic application code generation are widely accepted within the software engineering community. A few of these benefits include raising the abstraction level of application programming, shorter product development time, lower maintenance costs, and increased code quality and consistency. Surprisingly, code generation concepts have not yet found wide acceptance and use in the field of programmable logic controller (PLC) software development. Software engineers at the NASA Kennedy Space Center (KSC) recognized the need for PLC code generation while developing their new ground checkout and launch processing system. They developed a process and a prototype software tool that automatically translates a high-level representation or specification of safety critical application software into ladder logic that executes on a PLC. This process and tool are expected to increase the reliability of the PLC code over that which is written manually, and may even lower life-cycle costs and shorten the development schedule of the new control system at KSC. This paper examines the problem domain and discusses the process and software tool that were prototyped by the KSC software engineers.
The Integration of COTS/GOTS within NASA's HST Command and Control System
NASA Technical Reports Server (NTRS)
Pfarr, Thomas; Reis, James E.
2001-01-01
NASA's mission critical Hubble Space Telescope (HST) command and control system has been re-engineered with commercial-off-the-shelf (COTS/GOTS) and minimal custom code. This paper focuses on the design of this new HST Control Center System (CCS) and the lessons learned throughout its development. CCS currently utilizes more than 30 COTS/GOTS products with an additional 1/2 million lines of custom glueware code; the new CCS exceeds the capabilities of the original system while significantly reducing the lines of custom code by more than 50%. The lifecycle of COTS/GOTS products will be examined including the package selection process, evaluation process, and integration process. The advantages, disadvantages, issues, concerns, and lessons learned for integrating COTS/GOTS into the NASA's mission critical HST CCS will be examined in detail. This paper will reveal the many hidden costs of COTS/GOTS solutions when compared to traditional custom code development efforts; this paper will show the high cost of COTS/GOTS solutions including training expenses, consulting fees, and long-term maintenance expenses.
System Engineering Strategy for Distributed Multi-Purpose Simulation Architectures
NASA Technical Reports Server (NTRS)
Bhula, Dlilpkumar; Kurt, Cindy Marie; Luty, Roger
2007-01-01
This paper describes the system engineering approach used to develop distributed multi-purpose simulations. The multi-purpose simulation architecture focuses on user needs, operations, flexibility, cost and maintenance. This approach was used to develop an International Space Station (ISS) simulator, which is called the International Space Station Integrated Simulation (ISIS)1. The ISIS runs unmodified ISS flight software, system models, and the astronaut command and control interface in an open system design that allows for rapid integration of multiple ISS models. The initial intent of ISIS was to provide a distributed system that allows access to ISS flight software and models for the creation, test, and validation of crew and ground controller procedures. This capability reduces the cost and scheduling issues associated with utilizing standalone simulators in fixed locations, and facilitates discovering unknowns and errors earlier in the development lifecycle. Since its inception, the flexible architecture of the ISIS has allowed its purpose to evolve to include ground operator system and display training, flight software modification testing, and as a realistic test bed for Exploration automation technology research and development.
Code of Federal Regulations, 2010 CFR
2010-10-01
... that involve redesign of systems or subsystems. Life-cycle cost means the total cost to the Government... included, at the most appropriate time in the acquisition cycle, in solicitations and resulting contracts...
Code of Federal Regulations, 2012 CFR
2012-10-01
... that involve redesign of systems or subsystems. Life-cycle cost means the total cost to the Government... included, at the most appropriate time in the acquisition cycle, in solicitations and resulting contracts...
Code of Federal Regulations, 2014 CFR
2014-10-01
... that involve redesign of systems or subsystems. Life-cycle cost means the total cost to the Government... included, at the most appropriate time in the acquisition cycle, in solicitations and resulting contracts...
The evolutionary ecology of complex lifecycle parasites: linking phenomena with mechanisms
Auld, S KJR; Tinsley, M C
2015-01-01
Many parasitic infections, including those of humans, are caused by complex lifecycle parasites (CLPs): parasites that sequentially infect different hosts over the course of their lifecycle. CLPs come from a wide range of taxonomic groups—from single-celled bacteria to multicellular flatworms—yet share many common features in their life histories. Theory tells us when CLPs should be favoured by selection, but more empirical studies are required in order to quantify the costs and benefits of having a complex lifecycle, especially in parasites that facultatively vary their lifecycle complexity. In this article, we identify ecological conditions that favour CLPs over their simple lifecycle counterparts and highlight how a complex lifecycle can alter transmission rate and trade-offs between growth and reproduction. We show that CLPs participate in dynamic host–parasite coevolution, as more mobile hosts can fuel CLP adaptation to less mobile hosts. Then, we argue that a more general understanding of the evolutionary ecology of CLPs is essential for the development of effective frameworks to manage the many diseases they cause. More research is needed identifying the genetics of infection mechanisms used by CLPs, particularly into the role of gene duplication and neofunctionalisation in lifecycle evolution. We propose that testing for signatures of selection in infection genes will reveal much about how and when complex lifecycles evolved, and will help quantify complex patterns of coevolution between CLPs and their various hosts. Finally, we emphasise four key areas where new research approaches will provide fertile opportunities to advance this field. PMID:25227255
Early Design Energy Analysis Using Building Information Modeling Technology
2011-11-01
building, (a) floor plan and (b) 3D image. ....................................... 50 Figure 28. Comparison of different energy estimates...when they make the biggest impact on building life-cycle costs. Traditionally, most building energy analyses have been conducted late in design, by...complete energy analysis. This method enables project teams to make energy conscious decisions early in design when they impact building life-cycle
The cost of construction delays and traffic control for life-cycle cost analysis of pavements
DOT National Transportation Integrated Search
2002-03-01
The objective of this report is to provide the Kentucky Transportation Cabinet a reliable approach to quantifying/calculating "Road User Cost"--often referred to as total user delay costs. To meet this objective, this report is divided into three mai...
Longo, Caterina; Pontassuglia, Carmen; Corriero, Giuseppe; Gaino, Elda
2012-01-01
The calcareous sponge Paraleucilla magna, originally observed along the Brazilian coast (Atlantic Ocean), is the only allochthonous invasive species of Porifera reported in the Mediterranean Sea. A 1-year investigation of the population dynamics and life-cycle of this exotic species in the Mar Piccolo di Taranto (southern Italy, central Mediterranean Sea) has provided a good opportunity to test how environmental variations can influence its life-cycle and to ascertain what strategy can be adopted to successfully colonize a new environment. In the Mar Piccolo di Taranto, P. magna exhibits marked temporal changes in biomass. The studied specimens reproduce almost all year round, showing a seasonal pattern that peaks during warm months. This prolonged sexual activity allows P. magna to continuously produce young specimens, with repeated recruitment events taking place throughout the year, thus offsetting the seasonal mortality of adult specimens. This r-strategy enables the non-indigenous sponge to achieve a high degree of maintenance over relatively long periods (ten years at least). PMID:22905128
Influence of Surface Abrasion on Creep and Shrinkage of Railway Prestressed Concrete Sleepers
NASA Astrophysics Data System (ADS)
Li, Dan; Ngamkhanong, Chayut; Kaewunruen, Sakdirat
2017-10-01
Ballasted railway track is very suitable for heavy-rail networks because of its many superior advantages in design, construction, short- and long-term maintenance, sustainability, and life-cycle cost. The sleeper, which supports rail and distributes loads from rail to ballast, is a very important component of rail track system. Prestressed concrete is very popular used in manufacturing sleepers. Therefore, improved knowledge about design techniques for prestressed concrete (PC) sleepers has been developed. However, the ballast angularity causes differential abrasions on the soffit or bottom surface of sleepers. Furthermore, in sharp curves and rapid gradient change, longitudinal and lateral dynamics of rails increase the likelihood of abrasions in concrete sleepers. This paper presents a comparative investigation using a variety of methods to evaluate creep and shrinkage effects in railway prestressed concrete sleepers. The outcome of this study will improve the material design, which is very critical to the durability of railway track components.
1991-05-01
DC area labor and equipment rates were applied to this data to produce the tota!s shown in the column so titled. This column is given to pro , ide...00 m 30 c 000 CD OMOO CC m *~ O mO co 0 c~ m n 0mc c. co 0 m00mm o mo cU m m Dm M .N.Q mcn, In N m g -t C’ m’ g. 0 .0 .O 0 c gmO mOo gg 2 0 ! NOO O...N -. .. . 0 0 1 .00M000 .0 0 .o..0.. .0 ~0 90 0 00 3 0 ~ ~ .4 M~ c,0fOfllfOflOol"f~l~n u’gmlig iu olvn bO 00m Go0m mfl M"n - PRO .% .. R. M R 0’~~e
Scenario for concurrent conceptual assembly line design: A case study
NASA Astrophysics Data System (ADS)
Mas, F.; Ríos, J.; Menéndez, J. L.
2012-04-01
The decision to design and build a new aircraft is preceded by years of research and study. Different disciplines work together throughout the lifecycle to ensure not only a complete functional definition of the product, but also a complete industrialization, a marketing plan, a maintenance plan, etc. This case study focuses on the conceptual design phase. During this phase, the design solutions that will meet the functional and industrial requirements are defined, i.e.: the basic requirements of industrialization. During this phase, several alternatives are studied, and the most attractive in terms of performance and cost requirements is selected. As a result of the study of these alternatives, it is possible to define an early conceptual design of the assembly line and its basic parameters. The plant needs, long cycle jigs & tools or industrial means and human resources with the necessary skills can be determined in advance.
Code of Federal Regulations, 2014 CFR
2014-04-01
... justified by a newly created property-based needs assessment (a life-cycle physical needs assessments... calculated as the sum of total operating cost, modernization cost, and costs to address accrual needs. Costs... assist PHAs in completing the assessments. The spreadsheet calculator is designed to walk housing...
Code of Federal Regulations, 2013 CFR
2013-04-01
... justified by a newly created property-based needs assessment (a life-cycle physical needs assessments... calculated as the sum of total operating cost, modernization cost, and costs to address accrual needs. Costs... assist PHAs in completing the assessments. The spreadsheet calculator is designed to walk housing...
Finnveden, Göran; Björklund, Anna; Moberg, Asa; Ekvall, Tomas
2007-06-01
A large number of methods and approaches that can be used for supporting waste management decisions at different levels in society have been developed. In this paper an overview of methods is provided and preliminary guidelines for the choice of methods are presented. The methods introduced include: Environmental Impact Assessment, Strategic Environmental Assessment, Life Cycle Assessment, Cost-Benefit Analysis, Cost-effectiveness Analysis, Life-cycle Costing, Risk Assessment, Material Flow Accounting, Substance Flow Analysis, Energy Analysis, Exergy Analysis, Entropy Analysis, Environmental Management Systems, and Environmental Auditing. The characteristics used are the types of impacts included, the objects under study and whether the method is procedural or analytical. The different methods can be described as systems analysis methods. Waste management systems thinking is receiving increasing attention. This is, for example, evidenced by the suggested thematic strategy on waste by the European Commission where life-cycle analysis and life-cycle thinking get prominent positions. Indeed, life-cycle analyses have been shown to provide policy-relevant and consistent results. However, it is also clear that the studies will always be open to criticism since they are simplifications of reality and include uncertainties. This is something all systems analysis methods have in common. Assumptions can be challenged and it may be difficult to generalize from case studies to policies. This suggests that if decisions are going to be made, they are likely to be made on a less than perfect basis.
NASA Astrophysics Data System (ADS)
Khandelwal, P.; Pachori, A.; Khandelwal, T.
2013-12-01
This paper provides the complete information related to Right of Way (RoW) for the construction of new power transmission line (TL) in terms of present cost for overhead transmission line and underground XLPE transmission cable. The former part of the paper describes the general procedure and rules for acquisition of land for RoW by transmission asset owner (TAO) while in the later part the cost associated to acquire RoW and its impact on the cost of adjacent land have been detailed. It also discusses the actual dismantling cost including the cost of waste metal what TAO get after completion of lifecycle of TL due to increase in metal prices. In this paper cost of RoW after completion of lifecycle of TL is also highlighted. This paper compares the cost of RoW for overhead transmission line and underground XLPE transmission cable for construction of new TL. Also for old transmission infrastructure cost of RoW for change from overhead transmission line to underground XLPE transmission cable is detailed by application of replacement model.
Real options and asset valuation in competitive energy markets
NASA Astrophysics Data System (ADS)
Oduntan, Adekunle Richard
The focus of this work is to develop a robust valuation framework for physical power assets operating in competitive markets such as peaking or mid-merit thermal power plants and baseload power plants. The goal is to develop a modeling framework that can be adapted to different energy assets with different types of operating flexibilities and technical constraints and which can be employed for various purposes such as capital budgeting, business planning, risk management and strategic bidding planning among others. The valuation framework must also be able to capture the reality of power market rules and opportunities, as well as technical constraints of different assets. The modeling framework developed conceptualizes operating flexibilities of power assets as "switching options' whereby the asset operator decides at every decision point whether to switch from one operating mode to another mutually exclusive mode, within the limits of the equipment constraints of the asset. As a current decision to switch operating modes may affect future operating flexibilities of the asset and hence cash flows, a dynamic optimization framework is employed. The developed framework accounts for the uncertain nature of key value drivers by representing them with appropriate stochastic processes. Specifically, the framework developed conceptualizes the operation of a power asset as a multi-stage decision making problem where the operator has to make a decision at every stage to alter operating mode given currently available information about key value drivers. The problem is then solved dynamically by decomposing it into a series of two-stage sub-problems according to Bellman's optimality principle. The solution algorithm employed is the Least Squares Monte Carlo (LSM) method. The developed valuation framework was adapted for a gas-fired thermal power plant, a peaking hydroelectric power plant and a baseload power plant. This work built on previously published real options valuation methodologies for gas-fired thermal power plants by factoring in uncertainty from gas supply/consumption imbalance which is usually faced by gas-fired power generators. This source of uncertainty arises because of mismatch between natural gas and electricity wholesale markets. Natural gas markets in North America operate on a day-ahead basis while power plants are dispatched in real time. Inability of a power generator to match its gas supply and consumption in real time, leading to unauthorized gas over-run or under-run, attracts penalty charges from the gas supplier to the extent that the generator can not manage the imbalance through other means. By considering an illustrative power plant operating in Ontario, we show effects of gas-imbalance on dispatch strategies on a daily cycling operation basis and the resulting impact on net revenue. Similarly, we employ the developed valuation framework to value a peaking hydroelectric power plant. This application also builds on previous real options valuation work for peaking hydroelectric power plants by considering their operations in a joint energy and ancillary services market. Specifically, the valuation model is developed to capture the value of a peaking power plant whose owner has the flexibility to participate in a joint operating reserve market and an energy market, which is currently the case in the Ontario wholesale power market. The model factors in water inflow uncertainty into the reservoir forebay of a hydroelectric facility and also considers uncertain energy and operating reserve prices. The switching options considered include (i) a joint energy and operating reserve bid (ii) an energy only bid and (iii) a do nothing (idle) strategy. Being an energy limited power plant, by doing nothing at a decision interval, the power asset operator is able to timeshift scarce water for use at a future period when market situations are expected to be better. Finally, the developed valuation framework was employed to optimize life-cycle management decisions of a baseload power plant, such as a nuclear power plant. Given uncertainty of long-term value drivers, including power prices, equipment performance and the relationship between current life cycle spending and future equipment degradation, optimization is carried out with the objective of minimizing overall life-cycle related costs. These life-cycle costs include (i) lost revenue during planned and unplanned outages, (ii) potential costs of future equipment degradation due to inadequate preventative maintenance, and (iii) the direct costs of implementing the life-cycle projects. The switching options in this context include the option to shutdown the power plant in order to execute a given preventative maintenance and inspection project and the option to keep the option "alive" by choosing to delay a planned life-cycle activity.
NASA Technical Reports Server (NTRS)
ONeil, D. A.; Mankins, J. C.; Christensen, C. B.; Gresham, E. C.
2005-01-01
The Advanced Technology Lifecycle Analysis System (ATLAS), a spreadsheet analysis tool suite, applies parametric equations for sizing and lifecycle cost estimation. Performance, operation, and programmatic data used by the equations come from a Technology Tool Box (TTB) database. In this second TTB Technical Interchange Meeting (TIM), technologists, system model developers, and architecture analysts discussed methods for modeling technology decisions in spreadsheet models, identified specific technology parameters, and defined detailed development requirements. This Conference Publication captures the consensus of the discussions and provides narrative explanations of the tool suite, the database, and applications of ATLAS within NASA s changing environment.
Wake Vortex Systems Cost/Benefits Analysis
NASA Technical Reports Server (NTRS)
Crisp, Vicki K.
1997-01-01
The goals of cost/benefit assessments are to provide quantitative and qualitative data to aid in the decision-making process. Benefits derived from increased throughput (or decreased delays) used to balance life-cycle costs. Packaging technologies together may provide greater gains (demonstrate higher return on investment).
Sousa, Vitor; Dias-Ferreira, Celia; Vaz, João M; Meireles, Inês
2018-05-01
Extensive research has been carried out on waste collection costs mainly to differentiate costs of distinct waste streams and spatial optimization of waste collection services (e.g. routes, number, and location of waste facilities). However, waste collection managers also face the challenge of optimizing assets in time, for instance deciding when to replace and how to maintain, or which technological solution to adopt. These issues require a more detailed knowledge about the waste collection services' cost breakdown structure. The present research adjusts the methodology for buildings' life-cycle cost (LCC) analysis, detailed in the ISO 15686-5:2008, to the waste collection assets. The proposed methodology is then applied to the waste collection assets owned and operated by a real municipality in Portugal (Cascais Ambiente - EMAC). The goal is to highlight the potential of the LCC tool in providing a baseline for time optimization of the waste collection service and assets, namely assisting on decisions regarding equipment operation and replacement.
Advanced electric propulsion system concept for electric vehicles
NASA Technical Reports Server (NTRS)
Raynard, A. E.; Forbes, F. E.
1979-01-01
Seventeen propulsion system concepts for electric vehicles were compared to determine the differences in components and battery pack to achieve the basic performance level. Design tradeoffs were made for selected configurations to find the optimum component characteristics required to meet all performance goals. The anticipated performance when using nickel-zinc batteries rather than the standard lead-acid batteries was also evaluated. The two systems selected for the final conceptual design studies included a system with a flywheel energy storage unit and a basic system that did not have a flywheel. The flywheel system meets the range requirement with either lead-acid or nickel-zinc batteries and also the acceleration of zero to 89 km/hr in 15 s. The basic system can also meet the required performance with a fully charged battery, but, when the battery approaches 20 to 30 percent depth of discharge, maximum acceleration capability gradually degrades. The flywheel system has an estimated life-cycle cost of $0.041/km using lead-acid batteries. The basic system has a life-cycle cost of $0.06/km. The basic system, using batteries meeting ISOA goals, would have a life-cycle cost of $0.043/km.
A Cost Element Structure for Defense Training. Final Report.
ERIC Educational Resources Information Center
Knapp, Mark I.; Orlansky, Jesse
This paper identifies, structures, and defines a list of cost elements that is intended to describe fully the life-cycle cost of any formal program, course, or device for individual training of Department of Defense personnel. It was developed to provide consistent, comparable, and credible evaluations of the cost-effectiveness of alternative…
1989-07-31
Information System (OSMIS). The long-range objective is to develop methods to determine total operating and support (O&S) costs within life-cycle cost...objective was to assess the feasibility of developing cost estimating relationships (CERs) based on data from the Army Operating and Support Management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Al-Karaghouli, Ali; Kazmerski, L.L.
2010-04-15
This paper addresses the need for electricity of rural areas in southern Iraq and proposes a photovoltaic (PV) solar system to power a health clinic in that region. The total daily health clinic load is 31.6 kW h and detailed loads are listed. The National Renewable Energy Laboratory (NREL) optimization computer model for distributed power, ''HOMER,'' is used to estimate the system size and its life-cycle cost. The analysis shows that the optimal system's initial cost, net present cost, and electricity cost is US$ 50,700, US$ 60,375, and US$ 0.238/kW h, respectively. These values for the PV system are comparedmore » with those of a generator alone used to supply the load. We found that the initial cost, net present cost of the generator system, and electricity cost are US$ 4500, US$ 352,303, and US$ 1.332/kW h, respectively. We conclude that using the PV system is justified on humanitarian, technical, and economic grounds. (author)« less
An XML-Based Manipulation and Query Language for Rule-Based Information
NASA Astrophysics Data System (ADS)
Mansour, Essam; Höpfner, Hagen
Rules are utilized to assist in the monitoring process that is required in activities, such as disease management and customer relationship management. These rules are specified according to the application best practices. Most of research efforts emphasize on the specification and execution of these rules. Few research efforts focus on managing these rules as one object that has a management life-cycle. This paper presents our manipulation and query language that is developed to facilitate the maintenance of this object during its life-cycle and to query the information contained in this object. This language is based on an XML-based model. Furthermore, we evaluate the model and language using a prototype system applied to a clinical case study.
Amponsah, Isaac; Harrison, Kenneth W; Rizos, Dimitris C; Ziehl, Paul H
2008-01-01
There is a net emissions change when adopting new materials for use in civil infrastructure design. To evaluate the total net emissions change, one must consider changes in manufacture and associated life-cycle emissions, as well as changes in the quantity of material required. In addition, in principle one should also consider any differences in costs of the two designs because cost savings can be applied to other economic activities with associated environmental impacts. In this paper, a method is presented that combines these considerations to permit an evaluation of the net change in emissions when considering the adoption of emerging technologies/materials for civil infrastructure. The method factors in data on differences between a standard and new material for civil infrastructure, material requirements as specified in designs using both materials, and price information. The life-cycle assessment approach known as economic input-output life-cycle assessment (EIO-LCA) is utilized. A brief background on EIO-LCA is provided because its use is central to the method. The methodology is demonstrated with analysis of a switch from carbon steel to high-performance steel in military bridge design. The results are compared with a simplistic analysis that accounts for the weight reduction afforded by use of the high-performance steel but assuming no differences in manufacture.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wood, E.; Wang, L.; Gonder, J.
2013-10-01
Battery electric vehicles possess great potential for decreasing lifecycle costs in medium-duty applications, a market segment currently dominated by internal combustion technology. Characterized by frequent repetition of similar routes and daily return to a central depot, medium-duty vocations are well positioned to leverage the low operating costs of battery electric vehicles. Unfortunately, the range limitation of commercially available battery electric vehicles acts as a barrier to widespread adoption. This paper describes the National Renewable Energy Laboratory's collaboration with the U.S. Department of Energy and industry partners to analyze the use of small hydrogen fuel-cell stacks to extend the range ofmore » battery electric vehicles as a means of improving utility, and presumably, increasing market adoption. This analysis employs real-world vocational data and near-term economic assumptions to (1) identify optimal component configurations for minimizing lifecycle costs, (2) benchmark economic performance relative to both battery electric and conventional powertrains, and (3) understand how the optimal design and its competitiveness change with respect to duty cycle and economic climate. It is found that small fuel-cell power units provide extended range at significantly lower capital and lifecycle costs than additional battery capacity alone. And while fuel-cell range-extended vehicles are not deemed economically competitive with conventional vehicles given present-day economic conditions, this paper identifies potential future scenarios where cost equivalency is achieved.« less
2003 IDA Cost Research Symposium: Cost of Evolutionary Acquisition/Spiral Development
2003-08-01
Louis, Missouri”, IDA Paper P-3548 “Econometric Modeling of Acquisition Category I Systems at the Lockheed- Martin Plant in Marietta , Georgia”, IDA...Systems Command (NAVSEA)..................................................... B- 71 Naval Surface Warfare Center, Dahlgren Division (NSWCDD...cost estimates and reports on life-cycle costs of major defense acquisition programs (MDAPs) in Acquisition Category ID (see Reference [1]). Cost
NASA Astrophysics Data System (ADS)
Hall, Roger W.; Foster, Alistair; Herrmann Praturlon, Anja
2017-09-01
The Hot Forming and in-tool Quenching (HFQ®) process is a proven technique to enable complex shaped stampings to be manufactured from high strength aluminium. Its widespread uptake for high volume production will be maximised if it is able to wholly amortise the additional investment cost of this process compared to conventional deep drawing techniques. This paper discusses the use of three techniques to guide some of the development decisions taken during upscaling of the HFQ® process. Modelling of Process timing, Cost and Life-cycle impact were found to be effective tools to identify where development budget could be focused in order to be able to manufacture low cost panels of different sizes from many different alloys in a sustainable way. The results confirm that raw material cost, panel trimming, and artificial ageing were some of the highest contributing factors to final component cost. Additionally, heat treatment and lubricant removal stages played a significant role in the overall life-cycle assessment of the final products. These findings confirmed development priorities as novel furnace design, fast artificial ageing and low-cost alloy development.
NASA Astrophysics Data System (ADS)
Yetman, G.; Downs, R. R.
2011-12-01
Software deployment is needed to process and distribute scientific data throughout the data lifecycle. Developing software in-house can take software development teams away from other software development projects and can require efforts to maintain the software over time. Adopting and reusing software and system modules that have been previously developed by others can reduce in-house software development and maintenance costs and can contribute to the quality of the system being developed. A variety of models are available for reusing and deploying software and systems that have been developed by others. These deployment models include open source software, vendor-supported open source software, commercial software, and combinations of these approaches. Deployment in Earth science data processing and distribution has demonstrated the advantages and drawbacks of each model. Deploying open source software offers advantages for developing and maintaining scientific data processing systems and applications. By joining an open source community that is developing a particular system module or application, a scientific data processing team can contribute to aspects of the software development without having to commit to developing the software alone. Communities of interested developers can share the work while focusing on activities that utilize in-house expertise and addresses internal requirements. Maintenance is also shared by members of the community. Deploying vendor-supported open source software offers similar advantages to open source software. However, by procuring the services of a vendor, the in-house team can rely on the vendor to provide, install, and maintain the software over time. Vendor-supported open source software may be ideal for teams that recognize the value of an open source software component or application and would like to contribute to the effort, but do not have the time or expertise to contribute extensively. Vendor-supported software may also have the additional benefits of guaranteed up-time, bug fixes, and vendor-added enhancements. Deploying commercial software can be advantageous for obtaining system or software components offered by a vendor that meet in-house requirements. The vendor can be contracted to provide installation, support and maintenance services as needed. Combining these options offers a menu of choices, enabling selection of system components or software modules that meet the evolving requirements encountered throughout the scientific data lifecycle.
Lifecycle Analysis of Different Motors from the Standpoint of Environmental Impact
NASA Astrophysics Data System (ADS)
Orlova, S.; Rassõlkin, A.; Kallaste, A.; Vaimann, T.; Belahcen, A.
2016-12-01
Comparative analysis is performed for different motors from the standpoint of damage inflicted by them during their lifecycle. Three types of motors have been considered: the synchronous reluctance motor, the permanent magnet assisted synchronous reluctance motor and the induction motor. The assessment of lifecycle has been made in terms of its four stages: manufacturing, distribution, use and end of life. The results show that the production costs of synchronous reluctance motor are lower compared to that of permanent magnet assisted motors, but due to their low efficiency they exert the greatest environmental impact. The main conclusion is that the assessment made at the early designing stage for the related environmental impact enables its reduction.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, J.M.; Dittmer, A.L.; Elliott, D.B.
1995-02-01
The U.S. Army Forces Command (FORSCOM) has tasked the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Irwin facility located near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 2,more » Baseline Detail. The results of the analyses of EROs are presented in 16 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present valve (NPV) and savings-to-investment ratio (SIR) of each ERO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, G.P.; Keller, J.M.; Stucky, D.J.
The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executivemore » Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.« less
Save Money and the Planet: Make Your School Energy Efficient.
ERIC Educational Resources Information Center
Lewis, Eleanor J.; Weltman, Eric
1993-01-01
Examines ways in which schools can cut their energy costs. Suggestions are provided for making school lighting more efficient, conducting a life-cycle cost analysis to facilitate energy efficiency, and developing funding for implementing energy-efficient projects. (GLR)
Optimal maintenance of a multi-unit system under dependencies
NASA Astrophysics Data System (ADS)
Sung, Ho-Joon
The availability, or reliability, of an engineering component greatly influences the operational cost and safety characteristics of a modern system over its life-cycle. Until recently, the reliance on past empirical data has been the industry-standard practice to develop maintenance policies that provide the minimum level of system reliability. Because such empirically-derived policies are vulnerable to unforeseen or fast-changing external factors, recent advancements in the study of topic on maintenance, which is known as optimal maintenance problem, has gained considerable interest as a legitimate area of research. An extensive body of applicable work is available, ranging from those concerned with identifying maintenance policies aimed at providing required system availability at minimum possible cost, to topics on imperfect maintenance of multi-unit system under dependencies. Nonetheless, these existing mathematical approaches to solve for optimal maintenance policies must be treated with caution when considered for broader applications, as they are accompanied by specialized treatments to ease the mathematical derivation of unknown functions in both objective function and constraint for a given optimal maintenance problem. These unknown functions are defined as reliability measures in this thesis, and theses measures (e.g., expected number of failures, system renewal cycle, expected system up time, etc.) do not often lend themselves to possess closed-form formulas. It is thus quite common to impose simplifying assumptions on input probability distributions of components' lifetime or repair policies. Simplifying the complex structure of a multi-unit system to a k-out-of-n system by neglecting any sources of dependencies is another commonly practiced technique intended to increase the mathematical tractability of a particular model. This dissertation presents a proposal for an alternative methodology to solve optimal maintenance problems by aiming to achieve the same end-goals as Reliability Centered Maintenance (RCM). RCM was first introduced to the aircraft industry in an attempt to bridge the gap between the empirically-driven and theory-driven approaches to establishing optimal maintenance policies. Under RCM, qualitative processes that enable the prioritizing of functions based on the criticality and influence would be combined with mathematical modeling to obtain the optimal maintenance policies. Where this thesis work deviates from RCM is its proposal to directly apply quantitative processes to model the reliability measures in optimal maintenance problem. First, Monte Carlo (MC) simulation, in conjunction with a pre-determined Design of Experiments (DOE) table, can be used as a numerical means of obtaining the corresponding discrete simulated outcomes of the reliability measures based on the combination of decision variables (e.g., periodic preventive maintenance interval, trigger age for opportunistic maintenance, etc.). These discrete simulation results can then be regressed as Response Surface Equations (RSEs) with respect to the decision variables. Such an approach to represent the reliability measures with continuous surrogate functions (i.e., the RSEs) not only enables the application of the numerical optimization technique to solve for optimal maintenance policies, but also obviates the need to make mathematical assumptions or impose over-simplifications on the structure of a multi-unit system for the sake of mathematical tractability. The applicability of the proposed methodology to a real-world optimal maintenance problem is showcased through its application to a Time Limited Dispatch (TLD) of Full Authority Digital Engine Control (FADEC) system. In broader terms, this proof-of-concept exercise can be described as a constrained optimization problem, whose objective is to identify the optimal system inspection interval that guarantees a certain level of availability for a multi-unit system. A variety of reputable numerical techniques were used to model the problem as accurately as possible, including algorithms for the MC simulation, imperfect maintenance model from quasi renewal processes, repair time simulation, and state transition rules. Variance Reduction Techniques (VRTs) were also used in an effort to enhance MC simulation efficiency. After accurate MC simulation results are obtained, the RSEs are generated based on the goodness-of-fit measure to yield as parsimonious model as possible to construct the optimization problem. Under the assumption of constant failure rate for lifetime distributions, the inspection interval from the proposed methodology was found to be consistent with the one from the common approach used in industry that leverages Continuous Time Markov Chain (CTMC). While the latter does not consider maintenance cost settings, the proposed methodology enables an operator to consider different types of maintenance cost settings, e.g., inspection cost, system corrective maintenance cost, etc., to result in more flexible maintenance policies. When the proposed methodology was applied to the same TLD of FADEC example, but under the more generalized assumption of strictly Increasing Failure Rate (IFR) for lifetime distribution, it was shown to successfully capture component wear-out, as well as the economic dependencies among the system components.
Hybrid Piezoelectric/Fiber-Optic Sensor Sheets
NASA Technical Reports Server (NTRS)
Lin, Mark; Qing, Xinlin
2004-01-01
Hybrid piezoelectric/fiber-optic (HyPFO) sensor sheets are undergoing development. They are intended for use in nondestructive evaluation and long-term monitoring of the integrity of diverse structures, including aerospace, aeronautical, automotive, and large stationary ones. It is anticipated that the further development and subsequent commercialization of the HyPFO sensor systems will lead to economic benefits in the form of increased safety, reduction of life-cycle costs through real-time structural monitoring, increased structural reliability, reduction of maintenance costs, and increased readiness for service. The concept of a HyPFO sensor sheet is a generalization of the concept of a SMART Layer(TradeMark), which is a patented device that comprises a thin dielectric film containing an embedded network of distributed piezoelectric actuator/sensors. Such a device can be mounted on the surface of a metallic structure or embedded inside a composite-material structure during fabrication of the structure. There is has been substantial interest in incorporating sensors other than piezoelectric ones into SMART Layer(TradeMark) networks: in particular, because of the popularity of the use of fiber-optic sensors for monitoring the "health" of structures in recent years, it was decided to incorporate fiber-optic sensors, giving rise to the concept of HyPFO devices.
CELCAP: A Computer Model for Cogeneration System Analysis
NASA Technical Reports Server (NTRS)
1985-01-01
A description of the CELCAP cogeneration analysis program is presented. A detailed description of the methodology used by the Naval Civil Engineering Laboratory in developing the CELCAP code and the procedures for analyzing cogeneration systems for a given user are given. The four engines modeled in CELCAP are: gas turbine with exhaust heat boiler, diesel engine with waste heat boiler, single automatic-extraction steam turbine, and back-pressure steam turbine. Both the design point and part-load performances are taken into account in the engine models. The load model describes how the hourly electric and steam demand of the user is represented by 24 hourly profiles. The economic model describes how the annual and life-cycle operating costs that include the costs of fuel, purchased electricity, and operation and maintenance of engines and boilers are calculated. The CELCAP code structure and principal functions of the code are described to how the various components of the code are related to each other. Three examples of the application of the CELCAP code are given to illustrate the versatility of the code. The examples shown represent cases of system selection, system modification, and system optimization.
The Integration of COTS/GOTS within NASA's HST Command and Control System
NASA Technical Reports Server (NTRS)
Pfarr, Thomas; Reis, James E.; Obenschain, Arthur F. (Technical Monitor)
2001-01-01
NASA's mission critical Hubble Space Telescope (HST) command and control system has been re-engineered with COTS/GOTS and minimal custom code. This paper focuses on the design of this new HST Control Center System (CCS) and the lessons learned throughout its development. CCS currently utilizes 31 COTS/GOTS products with an additional 12 million lines of custom glueware code; the new CCS exceeds the capabilities of the original system while significantly reducing the lines of custom code by more than 50%. The lifecycle of COTS/GOTS products will be examined including the pack-age selection process, evaluation process, and integration process. The advantages, disadvantages, issues, concerns, and lessons teamed for integrating COTS/GOTS into the NASA's mission critical HST CCS will be examined in detail. Command and control systems designed with traditional custom code development efforts will be compared with command and control systems designed with new development techniques relying heavily on COTS/COTS integration. This paper will reveal the many hidden costs of COTS/GOTS solutions when compared to traditional custom code development efforts; this paper will show the high cost of COTS/GOTS solutions including training expenses, consulting fees, and long-term maintenance expenses.
Integrated Vehicle Health Management (IVHM) for Aerospace Systems
NASA Technical Reports Server (NTRS)
Baroth, Edmund C.; Pallix, Joan
2006-01-01
To achieve NASA's ambitious Integrated Space Transportation Program objectives, aerospace systems will implement a variety of new concept in health management. System level integration of IVHM technologies for real-time control and system maintenance will have significant impact on system safety and lifecycle costs. IVHM technologies will enhance the safety and success of complex missions despite component failures, degraded performance, operator errors, and environment uncertainty. IVHM also has the potential to reduce, or even eliminate many of the costly inspections and operations activities required by current and future aerospace systems. This presentation will describe the array of NASA programs participating in the development of IVHM technologies for NASA missions. Future vehicle systems will use models of the system, its environment, and other intelligent agents with which they may interact. IVHM will be incorporated into future mission planners, reasoning engines, and adaptive control systems that can recommend or execute commands enabling the system to respond intelligently in real time. In the past, software errors and/or faulty sensors have been identified as significant contributors to mission failures. This presentation will also address the development and utilization of highly dependable sohare and sensor technologies, which are key components to ensure the reliability of IVHM systems.
IEC 61511 and the capital project process--a protective management system approach.
Summers, Angela E
2006-03-17
This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.
NASA Technical Reports Server (NTRS)
Raynard, A. E.; Forbes, F. E.
1980-01-01
The two electric vehicle propulsion systems that best met cost and performance goals were examined to assess the effect of battery pack voltage on system performance and cost. A voltage range of 54 to 540 V was considered for a typical battery pack capacity of 24 k W-hr. The highest battery specific energy (W-hr/kg) and the lowest cost ($/kW-hr) were obtained at the minimum voltage level. The flywheel system traction motor is a dc, mechanically commutated with shunt field control, and due to the flywheel the traction motor and the battery are not subject to extreme peaks of power demand. The basic system uses a permanent-magnet motor with electronic commutation supplied by an ac power control unit. In both systems battery cost were the major factor in system voltage selection, and a battery pack with the minimum voltage of 54 V produced the lowest life-cycle cost. The minimum life-cycle cost for the basic system with lead-acid batteries was $0.057/km and for the flywheel system was $0.037/km.
Fuel economy and life-cycle cost analysis of a fuel cell hybrid vehicle
NASA Astrophysics Data System (ADS)
Jeong, Kwi Seong; Oh, Byeong Soo
The most promising vehicle engine that can overcome the problem of present internal combustion is the hydrogen fuel cell. Fuel cells are devices that change chemical energy directly into electrical energy without combustion. Pure fuel cell vehicles and fuel cell hybrid vehicles (i.e. a combination of fuel cell and battery) as energy sources are studied. Considerations of efficiency, fuel economy, and the characteristics of power output in hybridization of fuel cell vehicle are necessary. In the case of Federal Urban Driving Schedule (FUDS) cycle simulation, hybridization is more efficient than a pure fuel cell vehicle. The reason is that it is possible to capture regenerative braking energy and to operate the fuel cell system within a more efficient range by using battery. Life-cycle cost is largely affected by the fuel cell size, fuel cell cost, and hydrogen cost. When the cost of fuel cell is high, hybridization is profitable, but when the cost of fuel cell is less than 400 US$/kW, a pure fuel cell vehicle is more profitable.
Cost Model Comparison: A Study of Internally and Commercially Developed Cost Models in Use by NASA
NASA Technical Reports Server (NTRS)
Gupta, Garima
2011-01-01
NASA makes use of numerous cost models to accurately estimate the cost of various components of a mission - hardware, software, mission/ground operations - during the different stages of a mission's lifecycle. The purpose of this project was to survey these models and determine in which respects they are similar and in which they are different. The initial survey included a study of the cost drivers for each model, the form of each model (linear/exponential/other CER, range/point output, capable of risk/sensitivity analysis), and for what types of missions and for what phases of a mission lifecycle each model is capable of estimating cost. The models taken into consideration consisted of both those that were developed by NASA and those that were commercially developed: GSECT, NAFCOM, SCAT, QuickCost, PRICE, and SEER. Once the initial survey was completed, the next step in the project was to compare the cost models' capabilities in terms of Work Breakdown Structure (WBS) elements. This final comparison was then portrayed in a visual manner with Venn diagrams. All of the materials produced in the process of this study were then posted on the Ground Segment Team (GST) Wiki.
Valuation of plug-in vehicle life-cycle air emissions and oil displacement benefits
Michalek, Jeremy J.; Chester, Mikhail; Jaramillo, Paulina; Samaras, Constantine; Shiau, Ching-Shin Norman; Lave, Lester B.
2011-01-01
We assess the economic value of life-cycle air emissions and oil consumption from conventional vehicles, hybrid-electric vehicles (HEVs), plug-in hybrid-electric vehicles (PHEVs), and battery electric vehicles in the US. We find that plug-in vehicles may reduce or increase externality costs relative to grid-independent HEVs, depending largely on greenhouse gas and SO2 emissions produced during vehicle charging and battery manufacturing. However, even if future marginal damages from emissions of battery and electricity production drop dramatically, the damage reduction potential of plug-in vehicles remains small compared to ownership cost. As such, to offer a socially efficient approach to emissions and oil consumption reduction, lifetime cost of plug-in vehicles must be competitive with HEVs. Current subsidies intended to encourage sales of plug-in vehicles with large capacity battery packs exceed our externality estimates considerably, and taxes that optimally correct for externality damages would not close the gap in ownership cost. In contrast, HEVs and PHEVs with small battery packs reduce externality damages at low (or no) additional cost over their lifetime. Although large battery packs allow vehicles to travel longer distances using electricity instead of gasoline, large packs are more expensive, heavier, and more emissions intensive to produce, with lower utilization factors, greater charging infrastructure requirements, and life-cycle implications that are more sensitive to uncertain, time-sensitive, and location-specific factors. To reduce air emission and oil dependency impacts from passenger vehicles, strategies to promote adoption of HEVs and PHEVs with small battery packs offer more social benefits per dollar spent. PMID:21949359
Valuation of plug-in vehicle life-cycle air emissions and oil displacement benefits.
Michalek, Jeremy J; Chester, Mikhail; Jaramillo, Paulina; Samaras, Constantine; Shiau, Ching-Shin Norman; Lave, Lester B
2011-10-04
We assess the economic value of life-cycle air emissions and oil consumption from conventional vehicles, hybrid-electric vehicles (HEVs), plug-in hybrid-electric vehicles (PHEVs), and battery electric vehicles in the US. We find that plug-in vehicles may reduce or increase externality costs relative to grid-independent HEVs, depending largely on greenhouse gas and SO(2) emissions produced during vehicle charging and battery manufacturing. However, even if future marginal damages from emissions of battery and electricity production drop dramatically, the damage reduction potential of plug-in vehicles remains small compared to ownership cost. As such, to offer a socially efficient approach to emissions and oil consumption reduction, lifetime cost of plug-in vehicles must be competitive with HEVs. Current subsidies intended to encourage sales of plug-in vehicles with large capacity battery packs exceed our externality estimates considerably, and taxes that optimally correct for externality damages would not close the gap in ownership cost. In contrast, HEVs and PHEVs with small battery packs reduce externality damages at low (or no) additional cost over their lifetime. Although large battery packs allow vehicles to travel longer distances using electricity instead of gasoline, large packs are more expensive, heavier, and more emissions intensive to produce, with lower utilization factors, greater charging infrastructure requirements, and life-cycle implications that are more sensitive to uncertain, time-sensitive, and location-specific factors. To reduce air emission and oil dependency impacts from passenger vehicles, strategies to promote adoption of HEVs and PHEVs with small battery packs offer more social benefits per dollar spent.
ISEES: an institute for sustainable software to accelerate environmental science
NASA Astrophysics Data System (ADS)
Jones, M. B.; Schildhauer, M.; Fox, P. A.
2013-12-01
Software is essential to the full science lifecycle, spanning data acquisition, processing, quality assessment, data integration, analysis, modeling, and visualization. Software runs our meteorological sensor systems, our data loggers, and our ocean gliders. Every aspect of science is impacted by, and improved by, software. Scientific advances ranging from modeling climate change to the sequencing of the human genome have been rendered possible in the last few decades due to the massive improvements in the capabilities of computers to process data through software. This pivotal role of software in science is broadly acknowledged, while simultaneously being systematically undervalued through minimal investments in maintenance and innovation. As a community, we need to embrace the creation, use, and maintenance of software within science, and address problems such as code complexity, openness,reproducibility, and accessibility. We also need to fully develop new skills and practices in software engineering as a core competency in our earth science disciplines, starting with undergraduate and graduate education and extending into university and agency professional positions. The Institute for Sustainable Earth and Environmental Software (ISEES) is being envisioned as a community-driven activity that can facilitate and galvanize activites around scientific software in an analogous way to synthesis centers such as NCEAS and NESCent that have stimulated massive advances in ecology and evolution. We will describe the results of six workshops (Science Drivers, Software Lifecycles, Software Components, Workforce Development and Training, Sustainability and Governance, and Community Engagement) that have been held in 2013 to envision such an institute. We will present community recommendations from these workshops and our strategic vision for how ISEES will address the technical issues in the software lifecycle, sustainability of the whole software ecosystem, and the critical issue of computational training for the scientific community. Process for envisioning ISEES.
Facility Accounting: Hammering Out a Capital Replacement Budget.
ERIC Educational Resources Information Center
Readinger, Jay
1996-01-01
Most facility and finance managers cannot adequately handle school infrastructure issues because they lack the tools to describe the problem appropriately. Facility accounting gives managers accurate deferral and projected replacement costs, using nationally recognized life-cycle and cost data. Facility accounting enables proper management of…
Parametric sensitivity study for solar-assisted heat-pump systems
NASA Astrophysics Data System (ADS)
White, N. M.; Morehouse, J. H.
1981-07-01
The engineering and economic parameters affecting life-cycle costs for solar-assisted heat pump systems are investigted. The change in energy usage resulting from each engineering parameter varied was developed from computer simulations, and is compared with results from a stand-alone heat pump system. Three geographical locations are considered: Washington, DC, Fort Worth, TX, and Madison, WI. Results indicate that most engineering changes to the systems studied do not provide significant energy savings. The most promising parameters to ary are the solar collector parameters tau (-) and U/sub L/ the heat pump capacity at design point, and the minimum utilizable evaporator temperature. Costs associated with each change are estimated, and life-cycle costs computed for both engineering parameters and economic variations in interest rate, discount rate, tax credits, fuel unit costs and fuel inflation rates. Results indicate that none of the feasibile engineering changes for the system configuration studied will make these systems economically competitive with the stand-alone heat pump without a considerable tax credit.
Properties of Multifunctional Hybrid Carbon Nanotube/Carbon Fiber Polymer Matrix Composites
NASA Technical Reports Server (NTRS)
Cano, Roberto J.; Kang, Jin Ho; Grimsley, Brian W.; Ratcliffe, James G.; Siochi, Emilie J.
2016-01-01
For aircraft primary structures, carbon fiber reinforced polymer (CFRP) composites possess many advantages over conventional aluminum alloys due to their light weight, higher strength- and stiffness-to-weight ratios, and low life-cycle maintenance costs. However, the relatively low electrical and thermal conductivities of CFRP composites fail to provide structural safety in certain operational conditions such as lightning strikes. Carbon nanotubes (CNT) offer the potential to enhance the multi-functionality of composites with improved thermal and electrical conductivity. In this study, hybrid CNT/carbon fiber (CF) polymer composites were fabricated by interleaving layers of CNT sheets with Hexcel® IM7/8852 prepreg. Resin concentrations from 1 wt% to 50 wt% were used to infuse the CNT sheets prior to composite fabrication. The interlaminar properties of the resulting hybrid composites were characterized by mode I and II fracture toughness testing. Fractographical analysis was performed to study the effect of resin concentration. In addition, multi-directional physical properties like thermal conductivity of the orthotropic hybrid polymer composite were evaluated.
Fly-by-light technology development plan
NASA Technical Reports Server (NTRS)
Todd, J. R.; Williams, T.; Goldthorpe, S.; Hay, J.; Brennan, M.; Sherman, B.; Chen, J.; Yount, Larry J.; Hess, Richard F.; Kravetz, J.
1990-01-01
The driving factors and developments which make a fly-by-light (FBL) viable are discussed. Documentation, analyses, and recommendations are provided on the major issues pertinent to facilitating the U.S. implementation of commercial FBL aircraft before the turn of the century. Areas of particular concern include ultra-reliable computing (hardware/software); electromagnetic environment (EME); verification and validation; optical techniques; life-cycle maintenance; and basis and procedures for certification.
This presentation will cover the new cost estimation module of the US EPA National Stormwater Calculator and future enhancements, including a new mobile web app version of the tool. The presentation mainly focuses on how the calculator may be used to provide planning level capita...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brentlinger, L.A.; Hofmann, P.L.; Peterson, R.W.
1989-08-01
The movement of nuclear waste can be accomplished by various transport modal options involving different types of vehicles, transport casks, transport routes, and intermediate intermodal transfer facilities. A series of systems studies are required to evaluate modal/intermodal spent fuel transportation options in a consistent fashion. This report provides total life-cycle cost and life-cycle dose estimates for a series of transport modal options under existing site constraints. 14 refs., 7 figs., 28 tabs.
Analysis of the JSF Engine Competition
2012-09-01
even 25 Competition for Support Services Support costs are typically more than half of life-cycle costs and normally incurred in a sole-source...Strike Fighter), Aircraft Engines, Competition, Military Procurement, Defense Industry, Cost Analysis Analysis of the JSF Engine Competition James...different designs to meet the same functional requirements. Such a case was examined by the Institute for Defense Analyses in a forward-looking cost and
NASA Astrophysics Data System (ADS)
Gopal, Anand Raja
Lifecycle Assessment (LCA) is undergoing a period of rapid change as it strives to become more policy-relevant. Attributional LCA, the traditional LCA category, is beginning to be seen as particularly ill-equipped to assess the consequences of a policy. This has given birth to a new category of LCA known as Consequential LCA that is designed for use in LCA-based policies but is still largely unknown, even to LCA experts, and suffers from a lack of well developed methods. As a result, many LCA-based policies, like the California Low Carbon Fuel Standard (LCFS), use poor LCA methods that are both scientifically suspect and unable to model many biofuels, especially ones manufactured from byproduct feedstocks. Biofuels made from byproduct feedstocks, primarily molasses ethanol from Asia and the Caribbean, can contribute significantly to LCFS' carbon intensity targets in the near-term at low costs, a desperate need for the policy ever since US corn ethanol was rated as having a worse global warming impact than gasoline. In this dissertation, I develop the first fully consequential lifecycle assessment of a byproduct-based biofuel using a partial equilibrium foundation. I find that the lifecycle carbon content of Indian molasses ethanol is just 5 gCO2/MJ using this method, making it one of the cleanest first generation biofuels in the LCFS. I also show that Indian molasses ethanol remains one of the cleanest first-generation biofuels even when using the flawed methodology ratified for the LCFS, with a lifecycle carbon content of 24 gCO2/MJ. My fully consequential LCA model also shows that India's Ethanol Blending program, which currently subsidizes blending of molasses ethanol and gasoline for domestic consumption, can meet its objective of supporting domestic agriculture more cost-effectively by helping producers export their molasses ethanol to fuel markets that value carbon. However, this objective will be achieved at a significant cost to the poor who will face a 39% increase in the price of sorghum because of the policy.
X-33/RLV System Health Management/Vehicle Health Management
NASA Technical Reports Server (NTRS)
Mouyos, William; Wangu, Srimal
1998-01-01
To reduce operations costs, Reusable Launch Vehicles (RLVS) must include highly reliable robust subsystems which are designed for simple repair access with a simplified servicing infrastructure, and which incorporate expedited decision-making about faults and anomalies. A key component for the Single Stage To Orbit (SSTO) RLV system used to meet these objectives is System Health Management (SHM). SHM incorporates Vehicle Health Management (VHM), ground processing associated with the vehicle fleet (GVHM), and Ground Infrastructure Health Management (GIHM). The primary objective of SHM is to provide an automated and paperless health decision, maintenance, and logistics system. Sanders, a Lockheed Martin Company, is leading the design, development, and integration of the SHM system for RLV and for X-33 (a sub-scale, sub-orbit Advanced Technology Demonstrator). Many critical technologies are necessary to make SHM (and more specifically VHM) practical, reliable, and cost effective. This paper will present the X-33 SHM design which forms the baseline for the RLV SHM, and it will discuss applications of advanced technologies to future RLVs. In addition, this paper will describe a Virtual Design Environment (VDE) which is being developed for RLV. This VDE will allow for system design engineering, as well as program management teams, to accurately and efficiently evaluate system designs, analyze the behavior of current systems, and predict the feasibility of making smooth and cost-efficient transitions from older technologies to newer ones. The RLV SHM design methodology will reduce program costs, decrease total program life-cycle time, and ultimately increase mission success.
Evolution of RFID Applications in Construction: A Literature Review
Valero, Enrique; Adán, Antonio; Cerrada, Carlos
2015-01-01
Radio frequency identification (RFID) technology has been widely used in the field of construction during the last two decades. Basically, RFID facilitates the control on a wide variety of processes in different stages of the lifecycle of a building, from its conception to its inhabitance. The main objective of this paper is to present a review of RFID applications in the construction industry, pointing out the existing developments, limitations and gaps. The paper presents the establishment of the RFID technology in four main stages of the lifecycle of a facility: planning and design, construction and commission and operation and maintenance. Concerning this last stage, an RFID application aiming to facilitate the identification of pieces of furniture in scanned inhabited environments is presented. Conclusions and future advances are presented at the end of the paper. PMID:26151210
Reliability-based management of buried pipelines considering external corrosion defects
NASA Astrophysics Data System (ADS)
Miran, Seyedeh Azadeh
Corrosion is one of the main deteriorating mechanisms that degrade the energy pipeline integrity, due to transferring corrosive fluid or gas and interacting with corrosive environment. Corrosion defects are usually detected by periodical inspections using in-line inspection (ILI) methods. In order to ensure pipeline safety, this study develops a cost-effective maintenance strategy that consists of three aspects: corrosion growth model development using ILI data, time-dependent performance evaluation, and optimal inspection interval determination. In particular, the proposed study is applied to a cathodic protected buried steel pipeline located in Mexico. First, time-dependent power-law formulation is adopted to probabilistically characterize growth of the maximum depth and length of the external corrosion defects. Dependency between defect depth and length are considered in the model development and generation of the corrosion defects over time is characterized by the homogenous Poisson process. The growth models unknown parameters are evaluated based on the ILI data through the Bayesian updating method with Markov Chain Monte Carlo (MCMC) simulation technique. The proposed corrosion growth models can be used when either matched or non-matched defects are available, and have ability to consider newly generated defects since last inspection. Results of this part of study show that both depth and length growth models can predict damage quantities reasonably well and a strong correlation between defect depth and length is found. Next, time-dependent system failure probabilities are evaluated using developed corrosion growth models considering prevailing uncertainties where three failure modes, namely small leak, large leak and rupture are considered. Performance of the pipeline is evaluated through failure probability per km (or called a sub-system) where each subsystem is considered as a series system of detected and newly generated defects within that sub-system. Sensitivity analysis is also performed to determine to which incorporated parameter(s) in the growth models reliability of the studied pipeline is most sensitive. The reliability analysis results suggest that newly generated defects should be considered in calculating failure probability, especially for prediction of long-term performance of the pipeline and also, impact of the statistical uncertainty in the model parameters is significant that should be considered in the reliability analysis. Finally, with the evaluated time-dependent failure probabilities, a life cycle-cost analysis is conducted to determine optimal inspection interval of studied pipeline. The expected total life-cycle costs consists construction cost and expected costs of inspections, repair, and failure. The repair is conducted when failure probability from any described failure mode exceeds pre-defined probability threshold after each inspection. Moreover, this study also investigates impact of repair threshold values and unit costs of inspection and failure on the expected total life-cycle cost and optimal inspection interval through a parametric study. The analysis suggests that a smaller inspection interval leads to higher inspection costs, but can lower failure cost and also repair cost is less significant compared to inspection and failure costs.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., although by virtue of the life cycle costs, it would otherwise be identified as “major” in response to OMB... information system. Within the Department of Justice, a major automated information system is one whose life-cycle cost is in excess of $100 million. (b) Major real property system. (1) By purchase, when the...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., although by virtue of the life cycle costs, it would otherwise be identified as “major” in response to OMB... information system. Within the Department of Justice, a major automated information system is one whose life-cycle cost is in excess of $100 million. (b) Major real property system. (1) By purchase, when the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cumberland, Riley M.; Williams, Kent Alan; Jarrell, Joshua J.
This report evaluates how the economic environment (i.e., discount rate, inflation rate, escalation rate) can impact previously estimated differences in lifecycle costs between an integrated waste management system with an interim storage facility (ISF) and a similar system without an ISF.
ERIC Educational Resources Information Center
Sindt, Roger P.; Harris, Jack
Designed to assist prospective buyers in making such important decisions as whether to buy a new or older home and within what price range, the guide provides information on the purchase process. Discussion of the purchase process covers the life-cycle costs (recurring homeownership costs that must be met every month); selection of a home;…
Evaluation of The Operational Benefits Versus Costs of An Automated Cargo Mover
2016-12-01
logistics footprint and life-cycle cost are presented as part of this report. Analysis of modeling and simulation results identified statistically...life-cycle cost are presented as part of this report. Analysis of modeling and simulation results identified statistically significant differences...Error of Estimation. Source: Eskew and Lawler (1994). ...........................75 Figure 24. Load Results (100 Runs per Scenario
Cui, Borui; Gao, Dian-ce; Xiao, Fu; ...
2016-12-23
This article provides a method in comprehensive evaluation of cost-saving potential of active cool thermal energy storage (CTES) integrated with HVAC system for demand management in non-residential building. The active storage is beneficial by shifting peak demand for peak load management (PLM) as well as providing longer duration and larger capacity of demand response (DR). In this research, a model-based optimal design method using genetic algorithm is developed to optimize the capacity of active CTES aiming for maximizing the life-cycle cost saving concerning capital cost associated with storage capacity as well as incentives from both fast DR and PLM. Inmore » the method, the active CTES operates under a fast DR control strategy during DR events while under the storage-priority operation mode to shift peak demand during normal days. The optimal storage capacities, maximum annual net cost saving and corresponding power reduction set-points during DR event are obtained by using the proposed optimal design method. Lastly, this research provides guidance in comprehensive evaluation of cost-saving potential of CTES integrated with HVAC system for building demand management including both fast DR and PLM.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cui, Borui; Gao, Dian-ce; Xiao, Fu
This article provides a method in comprehensive evaluation of cost-saving potential of active cool thermal energy storage (CTES) integrated with HVAC system for demand management in non-residential building. The active storage is beneficial by shifting peak demand for peak load management (PLM) as well as providing longer duration and larger capacity of demand response (DR). In this research, a model-based optimal design method using genetic algorithm is developed to optimize the capacity of active CTES aiming for maximizing the life-cycle cost saving concerning capital cost associated with storage capacity as well as incentives from both fast DR and PLM. Inmore » the method, the active CTES operates under a fast DR control strategy during DR events while under the storage-priority operation mode to shift peak demand during normal days. The optimal storage capacities, maximum annual net cost saving and corresponding power reduction set-points during DR event are obtained by using the proposed optimal design method. Lastly, this research provides guidance in comprehensive evaluation of cost-saving potential of CTES integrated with HVAC system for building demand management including both fast DR and PLM.« less
Life-Cycle Costs of Alternative ICBM Second Stage Designs
1992-09-01
of Logistics, Air Force Institute of Technology (AU), Wright-Patterson AFB OH, 1992. 34. Horngren , Charles T. and George Foster. Cost Accounting ; A...Managerial Emphasis (Sixth Edition). Englewood Cliffs NJ: Prentice-Hall, Inc., 1987. 35. Horngren , Charles T. and George Foster. Cost Accounting ; A...our research. We would also like to thank those involved with the 1991 Small ICBM Operations and Support cost estimate. Your assistance with the O& S
NASA Astrophysics Data System (ADS)
Yang, Y.; Chui, T. F. M.
2016-12-01
Green infrastructure (GI) is identified as sustainable and environmentally friendly alternatives to the conventional grey stormwater infrastructure. Commonly used GI (e.g. green roof, bioretention, porous pavement) can provide multifunctional benefits, e.g. mitigation of urban heat island effects, improvements in air quality. Therefore, to optimize the design of GI and grey drainage infrastructure, it is essential to account for their benefits together with the costs. In this study, a comprehensive simulation-optimization modelling framework that considers the economic and hydro-environmental aspects of GI and grey infrastructure for small urban catchment applications is developed. Several modelling tools (i.e., EPA SWMM model, the WERF BMP and LID Whole Life Cycle Cost Modelling Tools) and optimization solvers are coupled together to assess the life-cycle cost-effectiveness of GI and grey infrastructure, and to further develop optimal stormwater drainage solutions. A typical residential lot in New York City is examined as a case study. The life-cycle cost-effectiveness of various GI and grey infrastructure are first examined at different investment levels. The results together with the catchment parameters are then provided to the optimization solvers, to derive the optimal investment and contributing area of each type of the stormwater controls. The relationship between the investment and optimized environmental benefit is found to be nonlinear. The optimized drainage solutions demonstrate that grey infrastructure is preferred at low total investments while more GI should be adopted at high investments. The sensitivity of the optimized solutions to the prices the stormwater controls is evaluated and is found to be highly associated with their utilizations in the base optimization case. The overall simulation-optimization framework can be easily applied to other sites world-wide, and to be further developed into powerful decision support systems.
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, Roy H.; Laliberte, D.; Render, H.; Sum, R.; Smith, W.; Terwilliger, R.
1987-01-01
The Software Automation, Generation and Administration (SAGA) project is investigating the design and construction of practical software engineering environments for developing and maintaining aerospace systems and applications software. The research includes the practical organization of the software lifecycle, configuration management, software requirements specifications, executable specifications, design methodologies, programming, verification, validation and testing, version control, maintenance, the reuse of software, software libraries, documentation, and automated management.
2010-06-01
cannot make a distinction between software maintenance and development” (Sharma, 2004). ISO /IEC 12207 Software Lifecycle Processes offers a guide to...synopsis of ISO /IEC 12207 , Raghu Singh of the Federal Aviation Administration states “Whenever a software product needs modifications, the development...Corporation. Singh, R. (1998). International Standard ISO /IEC 12207 Software Life Cycle Processes. Washington: Federal Aviation Administration. The Joint
Image quality specification and maintenance for airborne SAR
NASA Astrophysics Data System (ADS)
Clinard, Mark S.
2004-08-01
Specification, verification, and maintenance of image quality over the lifecycle of an operational airborne SAR begin with the specification for the system itself. Verification of image quality-oriented specification compliance can be enhanced by including a specification requirement that a vendor provide appropriate imagery at the various phases of the system life cycle. The nature and content of the imagery appropriate for each stage of the process depends on the nature of the test, the economics of collection, and the availability of techniques to extract the desired information from the data. At the earliest lifecycle stages, Concept and Technology Development (CTD) and System Development and Demonstration (SDD), the test set could include simulated imagery to demonstrate the mathematical and engineering concepts being implemented thus allowing demonstration of compliance, in part, through simulation. For Initial Operational Test and Evaluation (IOT&E), imagery collected from precisely instrumented test ranges and targets of opportunity consisting of a priori or a posteriori ground-truthed cultural and natural features are of value to the analysis of product quality compliance. Regular monitoring of image quality is possible using operational imagery and automated metrics; more precise measurements can be performed with imagery of instrumented scenes, when available. A survey of image quality measurement techniques is presented along with a discussion of the challenges of managing an airborne SAR program with the scarce resources of time, money, and ground-truthed data. Recommendations are provided that should allow an improvement in the product quality specification and maintenance process with a minimal increase in resource demands on the customer, the vendor, the operational personnel, and the asset itself.
NASA Technical Reports Server (NTRS)
Wang, Jianzhong Jay; Datta, Koushik; Landis, Michael R. (Technical Monitor)
2002-01-01
This paper describes the development of a life-cycle cost (LCC) estimating methodology for air traffic control Decision Support Tools (DSTs) under development by the National Aeronautics and Space Administration (NASA), using a combination of parametric, analogy, and expert opinion methods. There is no one standard methodology and technique that is used by NASA or by the Federal Aviation Administration (FAA) for LCC estimation of prospective Decision Support Tools. Some of the frequently used methodologies include bottom-up, analogy, top-down, parametric, expert judgement, and Parkinson's Law. The developed LCC estimating methodology can be visualized as a three-dimensional matrix where the three axes represent coverage, estimation, and timing. This paper focuses on the three characteristics of this methodology that correspond to the three axes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-08-01
This study is part of a three-phased demonstration project to reduce energy consumption in hospitals through practical life-cycle, cost-effective modifications and alterations. Funds for the demonstration project are provided by the American Hospital Association (AHA), the Department of Energy (DOE), and the Department of Health and Human Services (DHHS). Two hospitals in Michigan were selected for the project, Bay Medical Center in Bay City and St. Mary's Hospital in Grand Rapids. The objectives of this study, which is funded by HHS, are to investigate and analyze energy usage of the facilities and to identify all life-cycle, cost-effective changes required tomore » effect a reduction in energy consumption.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-08-01
This study is part of a three-phased demonstration project to reduce energy consumption in hospitals through practical life-cycle, cost-effective modifications and alterations. Funds for the demonstration project are provided by the American Hospital Association (AHA), the Department of Energy (DOE), and the Department of Health and Human Services (DHHS). Two hospitals in Michigan were selected for the project, Bay Medical Center in Bay City and St. Mary's Hospital in Ground Rapids. The objectives of this study, which is funded by HHS, are to investigate and analyze energy usage of the facilities and to identify all life-cycle, cost-effective changes required tomore » effect a reduction in energy consumption.« less
Life-cycle costs of high-performance cells
NASA Technical Reports Server (NTRS)
Daniel, R.; Burger, D.; Reiter, L.
1985-01-01
A life cycle cost analysis of high efficiency cells was presented. Although high efficiency cells produce more power, they also cost more to make and are more susceptible to array hot-spot heating. Three different computer analysis programs were used: SAMICS (solar array manufacturing industry costing standards), PVARRAY (an array failure mode/degradation simulator), and LCP (lifetime cost and performance). The high efficiency cell modules were found to be more economical in this study, but parallel redundancy is recommended.
Water loss control using pressure management: life-cycle energy and air emission effects.
Stokes, Jennifer R; Horvath, Arpad; Sturm, Reinhard
2013-10-01
Pressure management is one cost-effective and efficient strategy for controlling water distribution losses. This paper evaluates the life-cycle energy use and emissions for pressure management zones in Philadelphia, Pennsylvania, and Halifax, Nova Scotia. It compares water savings using fixed-outlet and flow-modulated pressure control to performance without pressure control, considering the embedded electricity and chemical consumption in the lost water, manufacture of pipe and fittings to repair breaks caused by excess pressure, and pressure management. The resulting energy and emissions savings are significant. The Philadelphia and Halifax utilities both avoid approximately 130 million liters in water losses annually using flow-modulated pressure management. The conserved energy was 780 GJ and 1900 GJ while avoided greenhouse gas emissions were 50 Mg and 170 Mg a year by Philadelphia and Halifax, respectively. The life-cycle financial and environmental performance of pressure management systems compares favorably to the traditional demand management strategy of installing low-flow toilets. The energy savings may also translate to cost-effective greenhouse gas emission reductions depending on the energy mix used, an important advantage in areas where water and energy are constrained and/or expensive and greenhouse gas emissions are regulated as in California, for example.
Failure rate and reliability of the KOMATSU hydraulic excavator in surface limestone mine
NASA Astrophysics Data System (ADS)
Harish Kumar N., S.; Choudhary, R. P.; Murthy, Ch. S. N.
2018-04-01
The model with failure rate function of bathtub-shaped is helpful in reliability analysis of any system and particularly in reliability associated privative maintenance. The usual Weibull distribution is, however, not capable to model the complete lifecycle of the any with a bathtub-shaped failure rate function. In this paper, failure rate and reliability analysis of the KOMATSU hydraulic excavator/shovel in surface mine is presented and also to improve the reliability and decrease the failure rate of each subsystem of the shovel based on the preventive maintenance. The model of the bathtub-shaped for shovel can also be seen as a simplification of the Weibull distribution.
Towards Agile Ontology Maintenance
NASA Astrophysics Data System (ADS)
Luczak-Rösch, Markus
Ontologies are an appropriate means to represent knowledge on the Web. Research on ontology engineering reached practices for an integrative lifecycle support. However, a broader success of ontologies in Web-based information systems remains unreached while the more lightweight semantic approaches are rather successful. We assume, paired with the emerging trend of services and microservices on the Web, new dynamic scenarios gain momentum in which a shared knowledge base is made available to several dynamically changing services with disparate requirements. Our work envisions a step towards such a dynamic scenario in which an ontology adapts to the requirements of the accessing services and applications as well as the user's needs in an agile way and reduces the experts' involvement in ontology maintenance processes.
2002 IDA Cost Research Symposium: Estimating the Costs of Transforming U.S. Military Forces
2002-08-01
FY00 billing rates for the following contractors and locations: Lockheed- Martin (Fort Worth, Palmdale, and Marietta ), Boeing (Puget Sound, Southern...2001 “Econometric Modeling of Acquisition Category I Systems at the Lockheed- Martin Plant in Marietta , Georgia,” IDA Paper P-3590, July 2001...Improvement Group (CAIG) in the Office of the Secretary of Defense (OSD) provides independent cost estimates and reports on life-cycle costs of major
Fluorescent Lamp Replacement Study
2017-07-01
friendly products, advances in efficiency, and lower production costs for lamps. The conversion of fluorescent bulbs to LED technology has many benefits ...of 4727 W. An economic analysis was calculated to compare the various lighting technologies that were implemented at ATC and the cost benefits ...the various lighting technologies that were implemented at ATC and the cost benefits of each, a lifecycle comparison was made between the fluorescent
Carbon Emissions Trading and Combined Heat and Power Strategies: Unintended Consequences
ERIC Educational Resources Information Center
Tysseling, John C.; Vosevich, Mary; Boersma, Benjamin R.; Zumwalt, Jefferey A.
2009-01-01
Facility professionals continuously search for projects that reduce energy consumption and operating costs so as to directly benefit their bottom line. Many institutions nationwide have contemplated or made investments in combined heat and power (CHP) projects as a life-cycle strategy to minimize operating costs. However, recent sustainability and…
The Economics of Solar Heating
NASA Technical Reports Server (NTRS)
Forney, J. A.
1982-01-01
SHCOST program assesses economic feasibility of solar energy for single-family residences and light commercial applications. Program analyzes life-cycle costs as well as sensitivity studies to aid designer in selecting most economically attractive solar system for single-family residence or light commercial application. SHCOST includes fairly comprehensive list of cost elements from which user may select.
This paper outlines a life-cycle cost analysis comparing a green (rain gardens) and gray (tunnels) infrastructure combination to a gray-only option to control combined sewer overflow in the Turkey Creek Combined Sewer Overflow Basin, in Kansas City, MO. The plan area of this Bas...
48 CFR 231.205-18 - Independent research and development and bid and proposal costs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... development of technologies identified as critical under 10 U.S.C. 2522. (6) Increase the development and promotion of efficient and effective applications of dual-use technologies. (7) Provide efficient and... and life-cycle costs of military systems. (3) Strengthen the defense industrial and technology base of...
48 CFR 231.205-18 - Independent research and development and bid and proposal costs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... development of technologies identified as critical under 10 U.S.C. 2522. (6) Increase the development and promotion of efficient and effective applications of dual-use technologies. (7) Provide efficient and... and life-cycle costs of military systems. (3) Strengthen the defense industrial and technology base of...
48 CFR 231.205-18 - Independent research and development and bid and proposal costs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... development of technologies identified as critical under 10 U.S.C. 2522. (6) Increase the development and promotion of efficient and effective applications of dual-use technologies. (7) Provide efficient and... and life-cycle costs of military systems. (3) Strengthen the defense industrial and technology base of...
48 CFR 231.205-18 - Independent research and development and bid and proposal costs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... development of technologies identified as critical under 10 U.S.C. 2522. (6) Increase the development and promotion of efficient and effective applications of dual-use technologies. (7) Provide efficient and... and life-cycle costs of military systems. (3) Strengthen the defense industrial and technology base of...
48 CFR 231.205-18 - Independent research and development and bid and proposal costs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... development of technologies identified as critical under 10 U.S.C. 2522. (6) Increase the development and promotion of efficient and effective applications of dual-use technologies. (7) Provide efficient and... and life-cycle costs of military systems. (3) Strengthen the defense industrial and technology base of...
14 CFR 170.23 - LORAN-C establishment criteria.
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES ESTABLISHMENT AND DISCONTINUANCE CRITERIA FOR AIR TRAFFIC CONTROL...-cost ratio equals or exceeds one). As defined in § 170.3 of this part, the benefit-cost ratio is the ratio of the present value of the LORAN-C life-cycle benefits (PVB) to the present value of LORAN-C life...
Manual para Compradores de Casas (Homebuyer's Guide).
ERIC Educational Resources Information Center
Sindt, Roger P.; Harris, Jack
Designed to assist prospective buyers in making such important decisions as whether to buy a new or older home and within what price range, the guide, written in Spanish, provides information on the purchase process. Discussion of the purchase process covers the life-cycle costs (recurring homeownership costs that must be met every month);…
Requirements Flowdown for Prognostics and Health Management
NASA Technical Reports Server (NTRS)
Goebel, Kai; Saxena, Abhinav; Roychoudhury, Indranil; Celaya, Jose R.; Saha, Bhaskar; Saha, Sankalita
2012-01-01
Prognostics and Health Management (PHM) principles have considerable promise to change the game of lifecycle cost of engineering systems at high safety levels by providing a reliable estimate of future system states. This estimate is a key for planning and decision making in an operational setting. While technology solutions have made considerable advances, the tie-in into the systems engineering process is lagging behind, which delays fielding of PHM-enabled systems. The derivation of specifications from high level requirements for algorithm performance to ensure quality predictions is not well developed. From an engineering perspective some key parameters driving the requirements for prognostics performance include: (1) maximum allowable Probability of Failure (PoF) of the prognostic system to bound the risk of losing an asset, (2) tolerable limits on proactive maintenance to minimize missed opportunity of asset usage, (3) lead time to specify the amount of advanced warning needed for actionable decisions, and (4) required confidence to specify when prognosis is sufficiently good to be used. This paper takes a systems engineering view towards the requirements specification process and presents a method for the flowdown process. A case study based on an electric Unmanned Aerial Vehicle (e-UAV) scenario demonstrates how top level requirements for performance, cost, and safety flow down to the health management level and specify quantitative requirements for prognostic algorithm performance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
The ECE application forecasts annual costs of preventive and corrective maintenance for budgeting purposes. Features within the application enable the user to change the specifications of the model to customize your forecast to best fit their needs and support “what if” analysis. Based on the user's selections, the ECE model forecasts annual maintenance costs. Preventive maintenance costs include the cost of labor to perform preventive maintenance activities at the specific frequency and labor rate. Corrective maintenance costs include the cost of labor and the cost of replacement parts. The application presents forecasted maintenance costs for the next five years inmore » two tables: costs by year and costs by site.« less
Proceedings: 1990 EPRI gas turbine procurement seminar
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, B.L.; Miller, M.N.
1991-06-01
This seminar presents information that enables utilities to implement more cost-effective procurements for gas turbine and combined-cycle power generation equipment. A systematic approach to specification and permitting procedures can lower unit life-cycle cost. APPROACH. Thirty-two staff members from 25 utilities met in Danvers, Massachusetts, October 9--11, 1990. Speakers representing utilities, vendors, and EPRI contractors presented material on recent procurement and startup experiences, permitting considerations, specification strategy, bid evaluation techniques, and a vendor's perspective of utility procurements. KEY POINTS. The seminar focused on specification features, procurement procedures, and bid evaluation techniques designed to implement life-cycle cost-effective procurement consistent with the plantmore » mission. Speakers highlighted the following issues: Experiential case histories of recent procurements and startups, emphasizing how to design procurement procedures that improve plant operating economics; Current trends in permitting for NO{sub x} compliance and recent permitting experience; Quantifiable evaluations of vendors' bids for RAM-related characteristics; The means to obtain specifically desired but nonstandard equipment features.« less
DOT National Transportation Integrated Search
1978-05-01
The Facilities Maintenance Cost Model (FMCM) is an analytic model designed to calculate expected annual labor costs of maintenance within a given FAA maintenance sector. The model is programmed in FORTRAN IV and has been demonstrated on the CDC Krono...
Brake System Design Optimization : Volume 2. Supplemental Data.
DOT National Transportation Integrated Search
1981-04-01
Existing freight car braking systems, components, and subsystems are characterized both physically and functionally, and life-cycle costs are examined. Potential improvements to existing systems previously proposed or available are identified and des...
Brake System Design Optimization. Volume II : Supplemental Data.
DOT National Transportation Integrated Search
1981-06-01
Existing freight car braking systems, components, and subsystems are characterized both physically and functionally, and life-cycle costs are examined. Potential improvements to existing systems previously proposed or available are identified and des...
AESA diagnostics in operational environments
NASA Astrophysics Data System (ADS)
Hull, W. P.
The author discusses some possible solutions to ASEA (active electronically scanned array) diagnostics in the operational environment using built-in testing (BIT), which can play a key role in reducing life-cycle cost if accurately implemented. He notes that it is highly desirable to detect and correct in the operational environment all degradation that impairs mission performance. This degradation must be detected with low false alarm rate and the appropriate action initiated consistent with low life-cycle cost. Mutual coupling is considered as a BIT signal injection method and is shown to have potential. However, the limits of the diagnostic capability using this method clearly depend on its stability and on the level of multipath for a specific application. BIT using mutual coupling may need to be supplemented on the ground by an externally mounted passive antenna that interfaces with onboard avionics.
Joint Direct Attack Munition (JDAM)
2015-12-01
February 19, 2015 and the O&S cost are based on an ICE dated August 28, 2014 Confidence Level Confidence Level of cost estimate for current APB: 50% A...mathematically derived confidence level was not computed for this Life-Cycle Cost Estimate (LCCE). This LCCE represents the expected value, taking into...consideration relevant risks, including ordinary levels of external and unforeseen events. It aims to provide sufficient resources to execute the
Reducing Lifecycle Sustainment Costs
2015-05-01
ahead of government systems – Specific O&S needs in government: depots, software centers, VAMOSC/ ERP interfaces Implications of ERP Systems...funding is not allocated for its implementation . Technology Refresh often requires non-recurring engineering investment, but the Working Capital Funds...VAMOSC Systems – Cost and Software Data Reports (CSDRs) • Contractor Logistics Support Contracts • Includes subcontractor reporting – Effects of
Automated Estimation Of Software-Development Costs
NASA Technical Reports Server (NTRS)
Roush, George B.; Reini, William
1993-01-01
COSTMODL is automated software development-estimation tool. Yields significant reduction in risk of cost overruns and failed projects. Accepts description of software product developed and computes estimates of effort required to produce it, calendar schedule required, and distribution of effort and staffing as function of defined set of development life-cycle phases. Written for IBM PC(R)-compatible computers.
Assessing inspection sensitivity as it relates to damage tolerance in composite rotor hubs
NASA Astrophysics Data System (ADS)
Roach, Dennis P.; Rackow, Kirk
2001-08-01
Increasing niche applications, growing international markets, and the emergence of advanced rotorcraft technology are expected to greatly increase the population of helicopters over the next decade. In terms of fuselage fatigue, helicopters show similar trends as fixed-wing aircraft. The highly unsteady loads experienced by rotating wings not only directly affect components in the dynamic systems but are also transferred to the fixed airframe structure. Expanded use of rotorcraft has focused attention on the use of new materials and the optimization of maintenance practices. The FAA's Airworthiness Assurance Center (AANC) at Sandia National Labs has joined with Bell Helicopter andother agencies in the rotorcraft industry to evaluate nondestructive inspection (NDI) capabilities in light of the damage tolerance of assorted rotorcraft structure components. Currently, the program's emphasis is on composite rotor hubs. The rotorcraft industry is constantly evaluating new types of lightweight composite materials that not only enhance the safety and reliability of rotor components but also improve performance and extended operating life as well. Composite rotor hubs have led to the use of bearingless rotor systems that are less complex and require less maintenance than their predecessors. The test facility described in this paper allows the structural stability and damage tolerance of composite hubs to be evaluated using realistic flight load spectrums of centrifugal force and bending loads. NDI was integrated into the life-cycle fatigue tests in order to evaluate flaw detection sensitivity simultaneously wiht residual strength and general rotor hub peformance. This paper will describe the evolving use of damage tolerance analysis (DTA) to direct and improve rotorcraft maintenance along with the related use of nondestructive inspections to manage helicopter safety. OVeralll, the data from this project will provide information to improve the producibility, inspectability, serviceability, and cost effectively of rotorcraft components.
NASA Technical Reports Server (NTRS)
Seasly, Elaine
2015-01-01
To combat contamination of physical assets and provide reliable data to decision makers in the space and missile defense community, a modular open system architecture for creation of contamination models and standards is proposed. Predictive tools for quantifying the effects of contamination can be calibrated from NASA data of long-term orbiting assets. This data can then be extrapolated to missile defense predictive models. By utilizing a modular open system architecture, sensitive data can be de-coupled and protected while benefitting from open source data of calibrated models. This system architecture will include modules that will allow the designer to trade the effects of baseline performance against the lifecycle degradation due to contamination while modeling the lifecycle costs of alternative designs. In this way, each member of the supply chain becomes an informed and active participant in managing contamination risk early in the system lifecycle.
Which factors affect software projects maintenance cost more?
Dehaghani, Sayed Mehdi Hejazi; Hajrahimi, Nafiseh
2013-03-01
The software industry has had significant progress in recent years. The entire life of software includes two phases: production and maintenance. Software maintenance cost is increasingly growing and estimates showed that about 90% of software life cost is related to its maintenance phase. Extraction and considering the factors affecting the software maintenance cost help to estimate the cost and reduce it by controlling the factors. In this study, the factors affecting software maintenance cost were determined then were ranked based on their priority and after that effective ways to reduce the maintenance costs were presented. This paper is a research study. 15 software related to health care centers information systems in Isfahan University of Medical Sciences and hospitals function were studied in the years 2010 to 2011. Among Medical software maintenance team members, 40 were selected as sample. After interviews with experts in this field, factors affecting maintenance cost were determined. In order to prioritize the factors derived by AHP, at first, measurement criteria (factors found) were appointed by members of the maintenance team and eventually were prioritized with the help of EC software. Based on the results of this study, 32 factors were obtained which were classified in six groups. "Project" was ranked the most effective feature in maintenance cost with the highest priority. By taking into account some major elements like careful feasibility of IT projects, full documentation and accompany the designers in the maintenance phase good results can be achieved to reduce maintenance costs and increase longevity of the software.
NASA Technical Reports Server (NTRS)
ONeil, D. A.; Craig, D. A.; Christensen, C. B.; Gresham, E. C.
2005-01-01
The objective of this Technical Interchange Meeting was to increase the quantity and quality of technical, cost, and programmatic data used to model the impact of investing in different technologies. The focus of this meeting was the Technology Tool Box (TTB), a database of performance, operations, and programmatic parameters provided by technologists and used by systems engineers. The TTB is the data repository used by a system of models known as the Advanced Technology Lifecycle Analysis System (ATLAS). This report describes the result of the November meeting, and also provides background information on ATLAS and the TTB.
Brake System Design Optimization : Volume 1. A Survey and Assessment.
DOT National Transportation Integrated Search
1978-06-01
Existing freight car braking systems, components, and subsystems are characterized both physically and functionally, and life-cycle costs are examined. Potential improvements to existing systems previously proposed or available are identified and des...
High-performance concrete : applying life-cycle cost analysis and developing specifications.
DOT National Transportation Integrated Search
2016-12-01
Numerous studies and transportation agency experience across the nation have established that highperformance concrete (HPC) technology improves concrete quality and extends the service life of concrete structures at risk of chlorideinduced cor...
Pavement management segment consolidation
DOT National Transportation Integrated Search
1998-01-01
Dividing roads into "homogeneous" segments has been a major problem for all areas of highway engineering. SDDOT uses Deighton Associates Limited software, dTIMS, to analyze life-cycle costs for various rehabilitation strategies on each segment of roa...
Vandenberg Air Force Base integrated resource assessment. Volume 3, Resource assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daellenbach, K.K.; Dagle, J.E.; Dittmer, A.L.
1993-06-01
The US Air Force Space Command (SPACECOM) has tasked the Pacific Northwest Laboratory (PNL), as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program (FEMP), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Vandenberg Air Force Base (VAFB). This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the SPACECOM VAFB facility located approximately 50 miles northwest of Santa Barbara, California. Itmore » is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analysis of EROs are presented in ten common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). In addition, a case study of process loads at Space Launch Complex-4 (SLC-4) is included. A narrative description of each ERO is provided, including information on the installed cost, energy and dollar savings; impacts on operation and maintenance (O and M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and value index (VI) of each ERO. Finally, an appendix includes a summary of an economic analysis case study of the South Vandenberg Power Plant (SVPP) operating scenarios.« less
Thermal Properties of Hybrid Carbon Nanotube/Carbon Fiber Polymer
NASA Technical Reports Server (NTRS)
Kang, Jin Ho; Cano, Roberto J.; Luong, Hoa; Ratcliffe, James G.; Grimsley, Brian W.; Siochi, Emilie J.
2016-01-01
Carbon fiber reinforced polymer (CFRP) composites possess many advantages for aircraft structures over conventional aluminum alloys: light weight, higher strength- and stiffness-to-weight ratio, and low life-cycle maintenance costs. However, the relatively low thermal and electrical conductivities of CFRP composites are deficient in providing structural safety under certain operational conditions such as lightning strikes. One possible solution to these issues is to interleave carbon nanotube (CNT) sheets between conventional carbon fiber (CF) composite layers. However, the thermal and electrical properties of the orthotropic hybrid CNT/CF composites have not been fully understood. In this study, hybrid CNT/CF polymer composites were fabricated by interleaving layers of CNT sheets with Hexcel (Registered Trademark) IM7/8852 prepreg. The CNT sheets were infused with a 5% solution of a compatible epoxy resin prior to composite fabrication. Orthotropic thermal and electrical conductivities of the hybrid polymer composites were evaluated. The interleaved CNT sheets improved the in-plane thermal conductivity of the hybrid composite laminates by about 400% and the electrical conductivity by about 3 orders of magnitude.
Innovative safety valve selection techniques and data.
Miller, Curt; Bredemyer, Lindsey
2007-04-11
The new valve data resources and modeling tools that are available today are instrumental in verifying that that safety levels are being met in both current installations and project designs. If the new ISA 84 functional safety practices are followed closely, good industry validated data used, and a user's maintenance integrity program strictly enforced, plants should feel confident that their design has been quantitatively reinforced. After 2 years of exhaustive reliability studies, there are now techniques and data available to support this safety system component deficiency. Everyone who has gone through the process of safety integrity level (SIL) verification (i.e. reliability math) will appreciate the progress made in this area. The benefits of these advancements are improved safety with lower lifecycle costs such as lower capital investment and/or longer testing intervals. This discussion will start with a review of the different valve, actuator, and solenoid/positioner combinations that can be used and their associated application restraints. Failure rate reliability studies (i.e. FMEDA) and data associated with the final combinations will then discussed. Finally, the impact of the selections on each safety system's SIL verification will be reviewed.
Commercial Discount Rate Estimation for Efficiency Standards Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fujita, K. Sydny
2016-04-13
Underlying each of the Department of Energy's (DOE's) federal appliance and equipment standards are a set of complex analyses of the projected costs and benefits of regulation. Any new or amended standard must be designed to achieve significant additional energy conservation, provided that it is technologically feasible and economically justified (42 U.S.C. 6295(o)(2)(A)). A proposed standard is considered economically justified when its benefits exceed its burdens, as represented by the projected net present value of costs and benefits. DOE performs multiple analyses to evaluate the balance of costs and benefits of commercial appliance and equipment e efficiency standards, at themore » national and individual building or business level, each framed to capture different nuances of the complex impact of standards on the commercial end user population. The Life-Cycle Cost (LCC) analysis models the combined impact of appliance first cost and operating cost changes on a representative commercial building sample in order to identify the fraction of customers achieving LCC savings or incurring net cost at the considered efficiency levels.1 Thus, the choice of commercial discount rate value(s) used to calculate the present value of energy cost savings within the Life-Cycle Cost model implicitly plays a key role in estimating the economic impact of potential standard levels.2 This report is intended to provide a more in-depth discussion of the commercial discount rate estimation process than can be readily included in standard rulemaking Technical Support Documents (TSDs).« less
Life-Cycle-Cost Analysis of the Microwave Landing System Ground and Airborne Systems
1981-10-01
constant 1980 dollars, with a production rate variability. Table S-3 presents the life-cycle costs by MLS configuration and total system implementation... PRODUCTION RATE VARIABILITY OVER A THREE-YEAR PFODUCTXION RUN (MILLIONS OF CONSTANT 1980 DOLLARS) Pruduction (Juantitl•e and Costs system Typ 75...Implementation strategies * Production schedules for MLS equipment The LCC was determined to be relatively insensitive to changes in MTBF. This was expected
Remote Minehunting System (RMS)
2015-12-01
1449.4 1449.4 744.6 Confidence Level Confidence Level of cost estimate for current APB: 50% The Independent Cost Estimate to support the RMS Nunn...which the Derpartment has been successful. It is difficult to calculate mathematically the precise confidence levels associated with life-cycle cost...Baseline (TY $M) Initial PAUC Production Estimate Changes PAUC Development Estimate Econ Qty Sch Eng Est Oth Spt Total 12.957 -0.752 3.262 2.950 0.454
NOSC Program Managers Handbook. Revision 1
1988-02-01
cost. The effects of application of life-cycle cost analysis through the planning and RIDT&E phases of a program, and the " design to cost" concept on...is the plan for assuring the quality of the design , design documentation, and fabricated/assembled hardware and associated computer software. 13.5.3.2...listings and printouts, which document the n. requirements, design , or details of compute : software; explain the capabilities and limitations of the
An Implementation of Integrated Logistic Support for Turkish Armed Forces
1990-06-01
of systems available for sale by friendly countries. Usually the procurement decision is based upon procurement costs so the tendency is to buy the...result from various design alternatives. From the author’s personal experience, careful planning before buying a weapon system would have solved various...convincing the government of the long term advantages of buying the system which has the least life-cycle costs, especially when these costs are spread
Least Life-Cycle Costs for Insulation in Alaska,
1982-10-01
cost of an item by 113 and the labor conl- needed for each floor. This implies that the ma- ponent by 1.5 to arrive at the contra(ctor’s c ost for...price, the sumri of the adjusted labor structural system or the utilities It would there- and material Costs Was Multiplied by 1 15 1 inal- fore be...of fuel, the cost of transporting According to Table 5, onik\\ atter 1t0 years fuel to the sites, the labor and materianl costs of would the act
NREL to Assist in Development and Evaluation of Class 6 Plug-in Hybrid
, and emissions, as well as the potential impacts on life-cycle costs, barriers to implementation, and application and maximizing potential energy efficiency, emissions, economic, and performance impacts."
Handbook on Planning for Sustainability for Water and Wastewater Utilities
The handbook details steps utilities can undertake to enhance their existing planning processes to ensure that water infrastructure investments are cost-effective over their life-cycle, resource efficient and support other relevant community goals.
Hassan, Sally; Huang, Hsini; Warren, Kim; Mahdavi, Behzad; Smith, David; Jong, Simcha; Farid, Suzanne S
2016-04-01
Some allogeneic cell therapies requiring a high dose of cells for large indication groups demand a change in cell expansion technology, from planar units to microcarriers in single-use bioreactors for the market phase. The aim was to model the optimal timing for making this change. A development lifecycle cash flow framework was created to examine the implications of process changes to microcarrier cultures at different stages of a cell therapy's lifecycle. The analysis performed under assumptions used in the framework predicted that making this switch earlier in development is optimal from a total expected out-of-pocket cost perspective. From a risk-adjusted net present value view, switching at Phase I is economically competitive but a post-approval switch can offer the highest risk-adjusted net present value as the cost of switching is offset by initial market penetration with planar technologies. The framework can facilitate early decision-making during process development.
Research requirements to reduce maintenance costs of civil helicopters
NASA Technical Reports Server (NTRS)
Million, D. J.; Waters, K. T.
1978-01-01
The maintenance problems faced by the operators of civil helicopters that result in high costs are documented. Existing technology that can be applied to reduce maintenance costs and research that should be carried out were identified. Good design practice and application of existing technology were described as having a significant impact on reducing maintenance costs immediately. The research and development that have potential for long range reduction of maintenance costs are presented.
Jeffrey Prestemon
2011-01-01
Protecting constructed facilities from damages from natural and man-made hazards in a costeffective manner is a challenging task. Several measures of economic performance are available for evaluating building-related investments. These measures include, but are not limited to, life-cycle cost, present value net savings, savings-to-investment ratio, and adjusted...
Code of Federal Regulations, 2012 CFR
2012-10-01
... plates, ramps or other appropriate devices; (4) Mini-high platforms, with multiple mini-high platforms or... chooses a means of meeting the performance standard other than using car-borne lifts, it must perform a comparison of the costs (capital, operating, and life-cycle costs) of car-borne lifts and the means chosen by...
Code of Federal Regulations, 2014 CFR
2014-10-01
... plates, ramps or other appropriate devices; (4) Mini-high platforms, with multiple mini-high platforms or... chooses a means of meeting the performance standard other than using car-borne lifts, it must perform a comparison of the costs (capital, operating, and life-cycle costs) of car-borne lifts and the means chosen by...
Code of Federal Regulations, 2011 CFR
2011-10-01
... plates, ramps or other appropriate devices; (4) Mini-high platforms, with multiple mini-high platforms or... chooses a means of meeting the performance standard other than using car-borne lifts, it must perform a comparison of the costs (capital, operating, and life-cycle costs) of car-borne lifts and the means chosen by...
Code of Federal Regulations, 2013 CFR
2013-10-01
... plates, ramps or other appropriate devices; (4) Mini-high platforms, with multiple mini-high platforms or... chooses a means of meeting the performance standard other than using car-borne lifts, it must perform a comparison of the costs (capital, operating, and life-cycle costs) of car-borne lifts and the means chosen by...
Secure it now or secure it later: the benefits of addressing cyber-security from the outset
NASA Astrophysics Data System (ADS)
Olama, Mohammed M.; Nutaro, James
2013-05-01
The majority of funding for research and development (R&D) in cyber-security is focused on the end of the software lifecycle where systems have been deployed or are nearing deployment. Recruiting of cyber-security personnel is similarly focused on end-of-life expertise. By emphasizing cyber-security at these late stages, security problems are found and corrected when it is most expensive to do so, thus increasing the cost of owning and operating complex software systems. Worse, expenditures on expensive security measures often mean less money for innovative developments. These unwanted increases in cost and potential slowing of innovation are unavoidable consequences of an approach to security that finds and remediate faults after software has been implemented. We argue that software security can be improved and the total cost of a software system can be substantially reduced by an appropriate allocation of resources to the early stages of a software project. By adopting a similar allocation of R&D funds to the early stages of the software lifecycle, we propose that the costs of cyber-security can be better controlled and, consequently, the positive effects of this R&D on industry will be much more pronounced.
System engineering of complex optical systems for mission assurance and affordability
NASA Astrophysics Data System (ADS)
Ahmad, Anees
2017-08-01
Affordability and reliability are equally important as the performance and development time for many optical systems for military, space and commercial applications. These characteristics are even more important for the systems meant for space and military applications where total lifecycle costs must be affordable. Most customers are looking for high performance optical systems that are not only affordable but are designed with "no doubt" mission assurance, reliability and maintainability in mind. Both US military and commercial customers are now demanding an optimum balance between performance, reliability and affordability. Therefore, it is important to employ a disciplined systems design approach for meeting the performance, cost and schedule targets while keeping affordability and reliability in mind. The US Missile Defense Agency (MDA) now requires all of their systems to be engineered, tested and produced according to the Mission Assurance Provisions (MAP). These provisions or requirements are meant to ensure complex and expensive military systems are designed, integrated, tested and produced with the reliability and total lifecycle costs in mind. This paper describes a system design approach based on the MAP document for developing sophisticated optical systems that are not only cost-effective but also deliver superior and reliable performance during their intended missions.
NASA Astrophysics Data System (ADS)
Hendrickson, Thomas P.; Horvath, Arpad
2014-01-01
Water distribution systems (WDSs) face great challenges as aging infrastructures require significant investments in rehabilitation, replacement, and expansion. Reducing environmental impacts as WDSs develop is essential for utility managers and policy makers. This study quantifies the existing greenhouse gas (GHG) footprint of common WDS elements using life-cycle assessment (LCA) while identifying the greatest opportunities for emission reduction. This study addresses oversights of the related literature, which fails to capture several WDS elements and to provide detailed life-cycle inventories. The life-cycle inventory results for a US case study utility reveal that 81% of GHGs are from pumping energy, where a large portion of these emissions are a result of distribution leaks, which account for 270 billion l of water losses daily in the United States. Pipe replacement scheduling is analyzed from an environmental perspective where, through incorporating leak impacts, a tool reveals that optimal replacement is no more than 20 years, which is in contrast to the US average of 200 years. Carbon abatement costs (CACs) are calculated for different leak reduction scenarios for the case utility that range from -130 to 35 t-1 CO2(eq). Including life-cycle modeling in evaluating pipe materials identified polyvinyl chloride (PVC) and cement-lined ductile iron (DICL) as the Pareto efficient options, however; utilizing PVC presents human health risks. The model developed for the case utility is applied to California and Texas to determine the CACs of reducing leaks to 5% of distributed water. For California, annual GHG savings from reducing leaks alone (3.4 million tons of CO2(eq)) are found to exceed California Air Resources Board’s estimate for energy efficiency improvements in the state’s water infrastructure.
Automatic Road Sign Inventory Using Mobile Mapping Systems
NASA Astrophysics Data System (ADS)
Soilán, M.; Riveiro, B.; Martínez-Sánchez, J.; Arias, P.
2016-06-01
The periodic inspection of certain infrastructure features plays a key role for road network safety and preservation, and for developing optimal maintenance planning that minimize the life-cycle cost of the inspected features. Mobile Mapping Systems (MMS) use laser scanner technology in order to collect dense and precise three-dimensional point clouds that gather both geometric and radiometric information of the road network. Furthermore, time-stamped RGB imagery that is synchronized with the MMS trajectory is also available. In this paper a methodology for the automatic detection and classification of road signs from point cloud and imagery data provided by a LYNX Mobile Mapper System is presented. First, road signs are detected in the point cloud. Subsequently, the inventory is enriched with geometrical and contextual data such as orientation or distance to the trajectory. Finally, semantic content is given to the detected road signs. As point cloud resolution is insufficient, RGB imagery is used projecting the 3D points in the corresponding images and analysing the RGB data within the bounding box defined by the projected points. The methodology was tested in urban and road environments in Spain, obtaining global recall results greater than 95%, and F-score greater than 90%. In this way, inventory data is obtained in a fast, reliable manner, and it can be applied to improve the maintenance planning of the road network, or to feed a Spatial Information System (SIS), thus, road sign information can be available to be used in a Smart City context.
Distributed Generation Energy Technology Operations and Maintenance Costs |
Costs Distributed Generation Energy Technology Operations and Maintenance Costs Transparent Cost Database Button The following charts indicate recent operations and maintenance (O&M) cost estimates available national-level cost data from a variety of sources. Costs in your specific location will vary. The
An Analysis of the United States Naval Aviation Schedule Removal Component (SRC) Card Process
2009-12-01
JSF has the ability to communicate in flight with its maintenance system , ALIS. Its Prognostic Health Management (PHM) System abilities allow it to...end-users. PLCS allows users of the system , through a central database, visibility of a component’s history and lifecycle data . Since both OOMA...used in PLM systems .2 This research recommends a PLM system that is Web-based and uses DoD- mandated UID technology as the future for data
ERIC Educational Resources Information Center
Mineo, Ronald W.; Stehn, John L.
1998-01-01
Discusses the effects of electric power deregulation on an educational facility's planning and purchasing for future power needs. Highlights ways schools can take advantage of deregulation. Examines various chiller technologies and economically assessing these technologies on a life-cycle cost basis. (GR)
Abrasion-resistant concrete mix designs for precast bridge deck panels.
DOT National Transportation Integrated Search
2010-08-01
The report documents laboratory investigations undertaken to develop high performance concrete (HPC) for precast and pre-stressed bridge deck components that would reduce the life-cycle cost of bridges by improving the studded tire wear (abrasion) re...
NASA Technical Reports Server (NTRS)
Tsou, P.; Stolte, W.
1978-01-01
The paper examines the impact of module and array designs on the balance-of-plant costs for flat-plate terrestrial central station power applications. Consideration is given to the following types of arrays: horizontal, tandem, augmented, tilt adjusted, and E-W tracking. The life-cycle cost of a 20-year plant life serves as the costing criteria for making design and cost tradeoffs. A tailored code of accounts is developed for determining consistent photovoltaic power plant costs and providing credible photovoltaic system cost baselines for flat-plate module and array designs by costing several varying array design approaches.
Survey points to practices that reduce refinery maintenance spending
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ricketts, R.
During the past decade, Solomon Associates Inc., Dallas, has conducted several comparative analyses of maintenance costs in the refining industry. These investigations have brought to light maintenance practices and reliability improvement activities that are responsible for the wide range of maintenance costs recorded by refineries. Some of the practices are of an organizational nature and thus are of interest to managers reviewing their operations. The paper discusses maintenance costs; profitability; cost trends; equipment availability; funds application; two basic organizational approached to maintenance (repair-focused organization and reliability-focused organization); low-cost practices; and organizational style.
An assessment of the industrial cogeneration market for parabolic dish systems
NASA Technical Reports Server (NTRS)
Doane, J. W.
1981-01-01
The value analysis technique used is straightforward. Maximum allowable life-cycle system cost for the cogeneration system is determined as the sum of the present value of fuels displaced plus the present value of revenues from exported power. Each conventional fuel displaced is described by a unit cost in the first year, a uniform annual consumption rate, and a uniform annual escalation rate for unit cost. Exported energy flows are treated the same as displaced energy.
Grounds Maintenance Cost Report.
ERIC Educational Resources Information Center
Joice, Donald K.
A grounds maintenance study was accomplished over the period of March 1965 through February 1966 to--(1) determine current grounds maintenance cost distribution; (2) provide basis for future grounds maintenance budgeting, and (3) provide basic data by which future landscape project designs can be developed to project or reduce maintenance costs.…
Product Lifecycle Management and the Quest for Sustainable Space Exploration Solutions
NASA Technical Reports Server (NTRS)
Caruso, Pamela W.; Dumbacher, Daniel L.; Grieves, Michael
2011-01-01
Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Marshall Space Flight Center (MSFC) Engineering Directorate, total lifecycle costs are important variables for critical decision-making. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful concept to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This briefing will demonstrate how the MSFC Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions and how that strategy aligns with the Agency and Center systems engineering policies and processes. Sustainable space exploration solutions demand that all lifecycle phases be optimized, and engineering the next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. Adopting PLM, which has been used by the aerospace and automotive industry for many years, for spacecraft applications provides a foundation for strong, disciplined systems engineering and accountable return on investment. PLM enables better solutions using fewer resources by making lifecycle considerations in an integrative decision-making process.
Advanced Technology Lifecycle Analysis System (ATLAS) Technology Tool Box (TTB)
NASA Technical Reports Server (NTRS)
Doyle, Monica; ONeil, Daniel A.; Christensen, Carissa B.
2005-01-01
The Advanced Technology Lifecycle Analysis System (ATLAS) is a decision support tool designed to aid program managers and strategic planners in determining how to invest technology research and development dollars. It is an Excel-based modeling package that allows a user to build complex space architectures and evaluate the impact of various technology choices. ATLAS contains system models, cost and operations models, a campaign timeline and a centralized technology database. Technology data for all system models is drawn from a common database, the ATLAS Technology Tool Box (TTB). The TTB provides a comprehensive, architecture-independent technology database that is keyed to current and future timeframes.
NASA Technical Reports Server (NTRS)
Pettit, C. D.; Barkhoudarian, S.; Daumann, A. G., Jr.; Provan, G. M.; ElFattah, Y. M.; Glover, D. E.
1999-01-01
In this study, we proposed an Advanced Health Management System (AHMS) functional architecture and conducted a technology assessment for liquid propellant rocket engine lifecycle health management. The purpose of the AHMS is to improve reusable rocket engine safety and to reduce between-flight maintenance. During the study, past and current reusable rocket engine health management-related projects were reviewed, data structures and health management processes of current rocket engine programs were assessed, and in-depth interviews with rocket engine lifecycle and system experts were conducted. A generic AHMS functional architecture, with primary focus on real-time health monitoring, was developed. Fourteen categories of technology tasks and development needs for implementation of the AHMS were identified, based on the functional architecture and our assessment of current rocket engine programs. Five key technology areas were recommended for immediate development, which (1) would provide immediate benefits to current engine programs, and (2) could be implemented with minimal impact on the current Space Shuttle Main Engine (SSME) and Reusable Launch Vehicle (RLV) engine controllers.
Nano-Launcher Technologies, Approaches, and Life Cycle Assessment. Phase II
NASA Technical Reports Server (NTRS)
Zapata, Edgar
2014-01-01
Assist in understanding NASA technology and investment approaches, and other driving factors, necessary for enabling dedicated nano-launchers by industry at a cost and flight rate that (1) could support and be supported by an emerging nano-satellite market and (2) would benefit NASAs needs. Develop life-cycle cost, performance and other NASA analysis tools or models required to understand issues, drivers and challenges.
Engineering Information Infrastructure for Product Lifecycle Managment
NASA Astrophysics Data System (ADS)
Kimura, Fumihiko
For proper management of total product life cycle, it is fundamentally important to systematize design and engineering information about product systems. For example, maintenance operation could be more efficiently performed, if appropriate parts design information is available at the maintenance site. Such information shall be available as an information infrastructure for various kinds of engineering operations, and it should be easily accessible during the whole product life cycle, such as transportation, marketing, usage, repair/upgrade, take-back and recycling/disposal. Different from the traditional engineering database, life cycle support information has several characteristic requirements, such as flexible extensibility, distributed architecture, multiple viewpoints, long-time archiving, and product usage information, etc. Basic approaches for managing engineering information infrastructure are investigated, and various information contents and associated life cycle applications are discussed.
Evaluation of double drop beads pavement edge lines.
DOT National Transportation Integrated Search
2009-08-01
This report presents an evaluation of Double Drop Bead (DDB) edge lines used on ALDOT-maintained highways. It compares DDB to three other pavement marking types in terms of service lives, life-cycle costs, and both dry-night retroreflectivity and wet...
ERIC Educational Resources Information Center
College Planning & Management, 1999
1999-01-01
Presents administrator's views on possible trends in college and universities. Addresses: hazardous waste disposal; privatization of custodial services; libraries and technology; building product purchases based on life-cycle cost; continuing education for employees; armed campus security; fees and tuition collection via online transactions; and…
Economic Evaluation of Dual-Level-Residence Solar-Energy System
NASA Technical Reports Server (NTRS)
1982-01-01
105-page report is one in a series of economic evaluations of different solar-energy installations. Using study results, an optimal collector area is chosen that minimizes life-cycle costs. From this optimal size thermal and economic performance is evaluated.
Analysis of Life-Cycle Costs and Market Applications of Flywheel Energy-Storage Transit Vehicles
DOT National Transportation Integrated Search
1979-07-01
The Urban Mass Transportation Administration (UMTA) has recently completed the Phase I activities of its Flywheel Energy Storage Program involving an analysis of the operational requirements and the conceptual design of flywheel energy storage vehicl...
2013-01-07
Budgetary Assessment as well as private sector companies . Reserve Forces Policy Board Eliminating Major Gaps in DoD Data on the Fully-Burdened and Life...and utilities costs associated with the housing, childcare and recreation facilities found on major bases. This is true whether the reservist is...Notably, the current Under Secretary of Defense Comptroller, the Honorable Robert Hale has said, “the cost of pay and benefits has risen more than 87
NASA Astrophysics Data System (ADS)
Sirirojvisuth, Apinut
In complex aerospace system design, making an effective design decision requires multidisciplinary knowledge from both product and process perspectives. Integrating manufacturing considerations into the design process is most valuable during the early design stages since designers have more freedom to integrate new ideas when changes are relatively inexpensive in terms of time and effort. Several metrics related to manufacturability are cost, time, and manufacturing readiness level (MRL). Yet, there is a lack of structured methodology that quantifies how changes in the design decisions impact these metrics. As a result, a new set of integrated cost analysis tools are proposed in this study to quantify the impacts. Equally important is the capability to integrate this new cost tool into the existing design methodologies without sacrificing agility and flexibility required during the early design phases. To demonstrate the applicability of this concept, a ModelCenter environment is used to develop software architecture that represents Integrated Product and Process Development (IPPD) methodology used in several aerospace systems designs. The environment seamlessly integrates product and process analysis tools and makes effective transition from one design phase to the other while retaining knowledge gained a priori. Then, an advanced cost estimating tool called Hybrid Lifecycle Cost Estimating Tool (HLCET), a hybrid combination of weight-, process-, and activity-based estimating techniques, is integrated with the design framework. A new weight-based lifecycle cost model is created based on Tailored Cost Model (TCM) equations [3]. This lifecycle cost tool estimates the program cost based on vehicle component weights and programmatic assumptions. Additional high fidelity cost tools like process-based and activity-based cost analysis methods can be used to modify the baseline TCM result as more knowledge is accumulated over design iterations. Therefore, with this concept, the additional manufacturing knowledge can be used to identify a more accurate lifecycle cost and facilitate higher fidelity tradeoffs during conceptual and preliminary design. Advanced Composite Cost Estimating Model (ACCEM) is employed as a process-based cost component to replace the original TCM result of the composite part production cost. The reason for the replacement is that TCM estimates production costs from part weights as a result of subtractive manufacturing of metallic origin such as casting, forging, and machining processes. A complexity factor can sometimes be adjusted to reflect different types of metal and machine settings. The TCM assumption, however, gives erroneous results when applied to additive processes like those of composite manufacturing. Another innovative aspect of this research is the introduction of a work measurement technique called Maynard Operation Sequence Technique (MOST) to be used, similarly to Activity-Based Costing (ABC) approach, to estimate manufacturing time of a part by virtue of breaking down the operations occurred during its production. ABC allows a realistic determination of cost incurred in each activity, as opposed to using a traditional method of time estimation by analogy or using response surface equations from historical process data. The MOST concept provides a tailored study of an individual process typically required for a new, innovative design. Nevertheless, the MOST idea has some challenges, one of which is its requirement to build a new process from ground up. The process development requires a Subject Matter Expertise (SME) in manufacturing method of the particular design. The SME must have also a comprehensive understanding of the MOST system so that the correct parameters are chosen. In practice, these knowledge requirements may demand people from outside of the design discipline and a priori training of MOST. To relieve the constraint, this study includes an entirely new sub-system architecture that comprises 1) a knowledge-based system to provide the required knowledge during the process selection; and 2) a new user-interface to guide the parameter selection when building the process using MOST. Also included in this study is the demonstration of how the HLCET and its constituents can be integrated with a Georgia Tech' Integrated Product and Process Development (IPPD) methodology. The applicability of this work will be shown through a complex aerospace design example to gain insights into how manufacturing knowledge helps make better design decisions during the early stages. The setup process is explained with an example of its utility demonstrated in a hypothetical fighter aircraft wing redesign. The evaluation of the system effectiveness against existing methodologies is illustrated to conclude the thesis.
Customer-centered careflow modeling based on guidelines.
Huang, Biqing; Zhu, Peng; Wu, Cheng
2012-10-01
In contemporary society, customer-centered health care, which stresses customer participation and long-term tailored care, is inevitably becoming a trend. Compared with the hospital or physician-centered healthcare process, the customer-centered healthcare process requires more knowledge and modeling such a process is extremely complex. Thus, building a care process model for a special customer is cost prohibitive. In addition, during the execution of a care process model, the information system should have flexibility to modify the model so that it adapts to changes in the healthcare process. Therefore, supporting the process in a flexible, cost-effective way is a key challenge for information technology. To meet this challenge, first, we analyze various kinds of knowledge used in process modeling, illustrate their characteristics, and detail their roles and effects in careflow modeling. Secondly, we propose a methodology to manage a lifecycle of the healthcare process modeling, with which models could be built gradually with convenience and efficiency. In this lifecycle, different levels of process models are established based on the kinds of knowledge involved, and the diffusion strategy of these process models is designed. Thirdly, architecture and prototype of the system supporting the process modeling and its lifecycle are given. This careflow system also considers the compatibility of legacy systems and authority problems. Finally, an example is provided to demonstrate implementation of the careflow system.
User's Guide for a Computerized Track Maintenance Simulation Cost Methodology
DOT National Transportation Integrated Search
1982-02-01
This User's Guide describes the simulation cost modeling technique developed for costing of maintenance operations of track and its component structures. The procedure discussed provides for separate maintenance cost entries to be associated with def...
NASA Astrophysics Data System (ADS)
Reynerson, Charles Martin
This research has been performed to create concept design and economic feasibility data for space business parks. A space business park is a commercially run multi-use space station facility designed for use by a wide variety of customers. Both space hardware and crew are considered as revenue producing payloads. Examples of commercial markets may include biological and materials research, processing, and production, space tourism habitats, and satellite maintenance and resupply depots. This research develops a design methodology and an analytical tool to create feasible preliminary design information for space business parks. The design tool is validated against a number of real facility designs. Appropriate model variables are adjusted to ensure that statistical approximations are valid for subsequent analyses. The tool is used to analyze the effect of various payload requirements on the size, weight and power of the facility. The approach for the analytical tool was to input potential payloads as simple requirements, such as volume, weight, power, crew size, and endurance. In creating the theory, basic principles are used and combined with parametric estimation of data when necessary. Key system parameters are identified for overall system design. Typical ranges for these key parameters are identified based on real human spaceflight systems. To connect the economics to design, a life-cycle cost model is created based upon facility mass. This rough cost model estimates potential return on investments, initial investment requirements and number of years to return on the initial investment. Example cases are analyzed for both performance and cost driven requirements for space hotels, microgravity processing facilities, and multi-use facilities. In combining both engineering and economic models, a design-to-cost methodology is created for more accurately estimating the commercial viability for multiple space business park markets.
Implementation of a low-cost, commercial orbit determination system
NASA Astrophysics Data System (ADS)
Corrigan, Jim
1994-11-01
Traditional satellite and launch control systems have consisted of custom solutions requiring significant development and maintenance costs. These systems have typically been designed to support specific program requirements and are expensive to modify and augment after delivery. The expanding role of space in today's marketplace combined with the increased sophistication and capabilities of modern satellites has created a need for more efficient, lower cost solutions to complete command and control systems. Recent technical advances have resulted in commercial-off-the-shelf products which greatly reduce the complete life-cycle costs associated with satellite launch and control system procurements. System integrators and spacecraft operators have, however, been slow to integrate these commercial based solutions into a comprehensive command and control system. This is due, in part, to a resistance to change and the fact that many available products are unable to effectively communicate with other commercial products. The United States Air Force, responsible for the health and safety of over 84 satellites via its Air Force Satellite Control Network (AFSCN), has embarked on an initiative to prove that commercial products can be used effectively to form a comprehensive command and control system. The initial version of this system is being installed at the Air Force's Center for Research Support (CERES) located at the National Test Facility in Colorado Springs, Colorado. The first stage of this initiative involved the identification of commercial products capable of satisfying each functional element of a command and control system. A significant requirement in this product selection criteria was flexibility and ability to integrate with other available commercial products. This paper discusses the functions and capabilities of the product selected to provide orbit determination functions for this comprehensive command and control system.
Implementation of a low-cost, commercial orbit determination system
NASA Technical Reports Server (NTRS)
Corrigan, Jim
1994-01-01
Traditional satellite and launch control systems have consisted of custom solutions requiring significant development and maintenance costs. These systems have typically been designed to support specific program requirements and are expensive to modify and augment after delivery. The expanding role of space in today's marketplace combined with the increased sophistication and capabilities of modern satellites has created a need for more efficient, lower cost solutions to complete command and control systems. Recent technical advances have resulted in commercial-off-the-shelf products which greatly reduce the complete life-cycle costs associated with satellite launch and control system procurements. System integrators and spacecraft operators have, however, been slow to integrate these commercial based solutions into a comprehensive command and control system. This is due, in part, to a resistance to change and the fact that many available products are unable to effectively communicate with other commercial products. The United States Air Force, responsible for the health and safety of over 84 satellites via its Air Force Satellite Control Network (AFSCN), has embarked on an initiative to prove that commercial products can be used effectively to form a comprehensive command and control system. The initial version of this system is being installed at the Air Force's Center for Research Support (CERES) located at the National Test Facility in Colorado Springs, Colorado. The first stage of this initiative involved the identification of commercial products capable of satisfying each functional element of a command and control system. A significant requirement in this product selection criteria was flexibility and ability to integrate with other available commercial products. This paper discusses the functions and capabilities of the product selected to provide orbit determination functions for this comprehensive command and control system.
Design-Tradeoff Model For Space Station
NASA Technical Reports Server (NTRS)
Chamberlain, Robert G.; Smith, Jeffrey L.; Borden, Chester S.; Deshpande, Govind K.; Fox, George; Duquette, William H.; Dilullo, Larry A.; Seeley, Larry; Shishko, Robert
1990-01-01
System Design Tradeoff Model (SDTM) computer program produces information which helps to enforce consistency of design objectives throughout system. Mathematical model of set of possible designs for Space Station Freedom. Program finds particular design enabling station to provide specified amounts of resources to users at lowest total (or life-cycle) cost. Compares alternative design concepts by changing set of possible designs, while holding specified services to users constant, and then comparing costs. Finally, both costs and services varied simultaneously when comparing different designs. Written in Turbo C 2.0.
The role of interest and inflation rates in life-cycle cost analysis
NASA Technical Reports Server (NTRS)
Eisenberger, I.; Remer, D. S.; Lorden, G.
1978-01-01
The effect of projected interest and inflation rates on life cycle cost calculations is discussed and a method is proposed for making such calculations which replaces these rates by a single parameter. Besides simplifying the analysis, the method clarifies the roles of these rates. An analysis of historical interest and inflation rates from 1950 to 1976 shows that the proposed method can be expected to yield very good projections of life cycle cost even if the rates themselves fluctuate considerably.
Value Engineering: An Application to Computer Software
1995-06-01
Ref. 4: P.2081 [Parentheses added] Figure S shows the cost function C(x) graphed with the Total Value function TV(x). It can be seen that for any...to be meaningful and ae-c-nrarp far tIha use V4a 4& trvite #nr- all nrnswn4_v%# s * 4 nna 33 since cost structures for each sotware de....o..n. project...maintainability quality characteristics due to longterm considerations affecting life-cycle costs .(0) S . VE applications provide alternative
Launch vehicle systems design analysis
NASA Technical Reports Server (NTRS)
Ryan, Robert; Verderaime, V.
1993-01-01
Current launch vehicle design emphasis is on low life-cycle cost. This paper applies total quality management (TQM) principles to a conventional systems design analysis process to provide low-cost, high-reliability designs. Suggested TQM techniques include Steward's systems information flow matrix method, quality leverage principle, quality through robustness and function deployment, Pareto's principle, Pugh's selection and enhancement criteria, and other design process procedures. TQM quality performance at least-cost can be realized through competent concurrent engineering teams and brilliance of their technical leadership.
Life-Cycle Evaluation of Domestic Energy Systems
NASA Astrophysics Data System (ADS)
Bando, Shigeru; Hihara, Eiji
Among the growing number of environmental issues, the global warming due to the increasing emission of greenhouse gases, such as carbon dioxide CO2, is the most serious one. In order to reduce CO2 emissions in energy use, it is necessary to reduce primary energy consumption, and to replace energy sources with alternatives that emit less CO2.One option of such ideas is to replace fossil gas for water heating with electricity generated by nuclear power, hydraulic power, and other methods with low CO2 emission. It is also important to use energy efficiently and to reduce waste heat. Co-generation system is one of the applications to be able to use waste heat from a generator as much as possible. The CO2 heat pump water heaters, the polymer electrolyte fuel cells, and the micro gas turbines have high potential for domestic energy systems. In the present study, the life-cycle cost, the life-cycle consumption of primary energy and the life-cycle emission of CO2 of these domestic energy systems are compare. The result shows that the CO2 heat pump water heaters have an ability to reduce CO2 emission by 10%, and the co-generation systems also have another ability to reduce primary energy consumption by 20%.
Environmental, mechanical and life-cycle cost analysis of bridge columns.
DOT National Transportation Integrated Search
2014-08-01
Corrosion of RC bridge element is one of the major deterioration distresses in US Highway Bridges. FRP composites jackets can be : the economic and effective corrosion repair in future, though its practices and field installation as a means of corros...
Maritime Tactical Command and Control Analysis of Alternatives
2016-01-01
JIIM joint, interagency, intergovernmental, and multinational LCC life-cycle cost MANA Map Aware Non-Uniform Automata MDA milestone decision authority...Map Aware Non-Uniform Automata (MANA), a combat and C4I, surveillance, and reconnaissance model developed by the New Zealand Defence Technology
Construction and performance monitoring of various asphalt mixes in Illinois : 2016 interim report.
DOT National Transportation Integrated Search
2017-02-01
A series of five experimental projects were constructed to better determine the life-cycle cost and performance of pavement overlays using various levels of asphalt binder replacement (ABR) from use of reclaimed asphalt pavement (RAP), recycled aspha...
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Life cycle analysis. For new construction and substantial rehabilitation, the criteria to be used in equipping the proposed development with heating and cooling systems, which shall include a life-cycle cost... the proposed site, site plan, and neighborhood. (f) Market analysis. An analysis of the projected...
Tank car accident data analysis
DOT National Transportation Integrated Search
1991-06-01
This report presents the results of a study of accidents involving railroad tank cars. The study is part of an overall effort to provide improved safety of rail transportation at reduced life-cycle costs. A major goal of the study is to provide a tec...
Data Base Development of Automobile and Light Truck Maintenance : Volume II. Appendix E.
DOT National Transportation Integrated Search
1978-08-01
The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...
Data Base Development of Automobile and Light Truck Maintenance : Volume III. Appendix F.
DOT National Transportation Integrated Search
1978-08-01
The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...
42 CFR 413.198 - Recordkeeping and cost reporting requirements for outpatient maintenance dialysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... outpatient maintenance dialysis. 413.198 Section 413.198 Public Health CENTERS FOR MEDICARE & MEDICAID... § 413.198 Recordkeeping and cost reporting requirements for outpatient maintenance dialysis. (a) Purpose... will enable CMS to determine the costs incurred in furnishing outpatient maintenance dialysis as...
Tampekis, Stergios; Samara, Fani; Sakellariou, Stavros; Sfougaris, Athanassios; Christopoulou, Olga
2018-02-12
The sustainable forest management can be achieved only through environmentally sound and economically efficient and feasible forest road networks and transportation systems that can potentially improve the multi-functional use of forest resources. However, road network planning and construction suggest long-term finance that require a capital investment (cash outflow), which would be equal to the value of the total revenue flow (cash inflow) over the whole lifecycle project. This paper emphasizes in an eco-efficient and economical optimum evaluation method for the forest road networks in the mountainous forest of Metsovo, Greece. More specifically, with the use of this technique, we evaluated the forest roads' (a) total construction costs, (b) annual maintenance cost, and (c) log skidding cost. In addition, we estimated the total economic value of forest goods and services that are lost from the forest roads' construction. Finally, we assessed the optimum eco-efficient and economical forest roads densities based on linear equations that stem from the internal rate of return method (IRR) and have been presented graphically. Data analysis and its presentation are achieved with the contribution of geographic information systems (GIS). The technique which is described in this study can be for the decision makers an attractive and useful implement in order to select the most eco-friendly and economical optimum solution to plan forest road network or to evaluate the existing forest transportation systems. Hence, with the use of this method, we can combine not only the multi-objective utilization of natural resources but also the environmental protection of forest ecosystems.
Methodology for Evaluating Cost-effectiveness of Commercial Energy Code Changes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Liu, Bing
This document lays out the U.S. Department of Energy’s (DOE’s) method for evaluating the cost-effectiveness of energy code proposals and editions. The evaluation is applied to provisions or editions of the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Standard 90.1 and the International Energy Conservation Code (IECC). The method follows standard life-cycle cost (LCC) economic analysis procedures. Cost-effectiveness evaluation requires three steps: 1) evaluating the energy and energy cost savings of code changes, 2) evaluating the incremental and replacement costs related to the changes, and 3) determining the cost-effectiveness of energy code changes based on those costs andmore » savings over time.« less
Study of turboprop systems reliability and maintenance costs
NASA Technical Reports Server (NTRS)
1978-01-01
The overall reliability and maintenance costs (R&MC's) of past and current turboprop systems were examined. Maintenance cost drivers were found to be scheduled overhaul (40%), lack of modularity particularly in the propeller and reduction gearbox, and lack of inherent durability (reliability) of some parts. Comparisons were made between the 501-D13/54H60 turboprop system and the widely used JT8D turbofan. It was found that the total maintenance cost per flight hour of the turboprop was 75% higher than that of the JT8D turbofan. Part of this difference was due to propeller and gearbox costs being higher than those of the fan and reverser, but most of the difference was in the engine core where the older technology turboprop core maintenance costs were nearly 70 percent higher than for the turbofan. The estimated maintenance cost of both the advanced turboprop and advanced turbofan were less than the JT8D. The conclusion was that an advanced turboprop and an advanced turbofan, using similar cores, will have very competitive maintenance costs per flight hour.
When the seasons don't fit: speedy molt as a routine carry-over cost of reproduction.
Dietz, Maurine W; Rogers, Ken G; Piersma, Theunis
2013-01-01
The failure of animals to fit all life-cycle stages into an annual cycle could reduce the chances of successful breeding. In some cases, non-optimal strategies will be adopted in order to maintain the life-cycle within the scope of one year. We studied trade-offs made by a High Arctic migrant shorebird, the red knot Calidris canutus islandica, between reproduction and wing feather molt carried out in the non-breeding period in the Dutch Wadden Sea. We compared primary molt duration between birds undertaking the full migratory and breeding schedule with birds that forego breeding because they are young or are maintained in captivity. Molt duration was ca. 71 days in breeding adults, which was achieved by an accelerated feather replacement strategy. Second-year birds and captive adults took ca. 22% and 27% longer, respectively. Second-year birds start molt in late June, more than four weeks before captive adults, and almost seven weeks before adults that return from breeding in late July-August. Adults finish molt in October when steeply increasing thermostatic costs and reductions in food availability occur. Primary molt duration was longer in female than in male knots (all ages), which was accordance with the somewhat larger body size of females. Since fast growth leads to lower quality feathers, the speedy wing molt shown by Arctic-breeding birds may represent a time constraint that is an unavoidable and routine cost of reproduction. So far it was hypothesized that only birds over 1 kg would have difficulty fitting molt within a year. Here we show that in birds an order of magnitude smaller, temporal imperatives may impose the adoption of non-optimal life-cycle routines in the entire actively breeding population.
Deep space network software cost estimation model
NASA Technical Reports Server (NTRS)
Tausworthe, R. C.
1981-01-01
A parametric software cost estimation model prepared for Jet PRopulsion Laboratory (JPL) Deep Space Network (DSN) Data System implementation tasks is described. The resource estimation mdel modifies and combines a number of existing models. The model calibrates the task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software life-cycle statistics.
1987-08-01
225686 458892 875261 29791 162090 40137 1791858 IL R -A I.11 i - - - - -- _ _ __ _ _ ...4" .. ... "In m ur ln nm m i -73- V1.OUTPUT MODULE This module...Reenlist bonus 0 29791 29791 Crossflow fees 17271 40137 22865 Total 1417261 1791858 374597 - 75 - Table 7.3 GUIDELINES FOR CHOOSING MANAGEMENT
Army Logistician. Volume 34, Issue 2, March-April 2002
2002-04-01
potential coalition part- ners; and, • Leverage of U.S. resources through cost sharing and economies of scale.” DOD guidance focuses on the broad goals of...be funded privately through the Army Historical Foundation. • Operations research and operations management. • Engineering economy , life-cycle cost ...will be implemented this summer. A review of Army organizations below the headquarters level should be completed this spring. EDGEWOOD ENZYMATIC DECON
A Cost-Reduction Strategy for Weapon System Acquisition
1990-12-01
quantities, manufacturing processes, and test and evaluation are made. As a result, by milestone I, approximately 60% of the life-cycle costs are already...Assess the results from the potential SDIO application of the CRS and 5 consider further development and testing of the strategy. - Consider a policy that...eliminating activities must be carefully weighed. For example, extensive testing and I program reviews are typically classified as non-value added activities
Levis, James W; Barlaz, Morton A; Decarolis, Joseph F; Ranjithan, S Ranji
2014-04-01
Solid waste management (SWM) systems must proactively adapt to changing policy requirements, waste composition, and an evolving energy system to sustainably manage future solid waste. This study represents the first application of an optimizable dynamic life-cycle assessment framework capable of considering these future changes. The framework was used to draw insights by analyzing the SWM system of a hypothetical suburban U.S. city of 100 000 people over 30 years while considering changes to population, waste generation, and energy mix and costs. The SWM system included 3 waste generation sectors, 30 types of waste materials, and 9 processes for waste separation, treatment, and disposal. A business-as-usual scenario (BAU) was compared to three optimization scenarios that (1) minimized cost (Min Cost), (2) maximized diversion (Max Diversion), and (3) minimized greenhouse gas (GHG) emissions (Min GHG) from the system. The Min Cost scenario saved $7.2 million (12%) and reduced GHG emissions (3%) relative to the BAU scenario. Compared to the Max Diversion scenario, the Min GHG scenario cost approximately 27% less and more than doubled the net reduction in GHG emissions. The results illustrate how the timed-deployment of technologies in response to changes in waste composition and the energy system results in more efficient SWM system performance compared to what is possible from static analyses.
Kavvada, Olga; Tarpeh, William A; Horvath, Arpad; Nelson, Kara L
2017-11-07
Nitrogen standards for discharge of wastewater effluent into aquatic bodies are becoming more stringent, requiring some treatment plants to reduce effluent nitrogen concentrations. This study aimed to assess, from a life-cycle perspective, an innovative decentralized approach to nitrogen recovery: ion exchange of source-separated urine. We modeled an approach in which nitrogen from urine at individual buildings is sorbed onto resins, then transported by truck to regeneration and fertilizer production facilities. To provide insight into impacts from transportation, we enhanced the traditional economic and environmental assessment approach by combining spatial analysis, system-scale evaluation, and detailed last-mile logistics modeling using the city of San Francisco as an illustrative case study. The major contributor to energy intensity and greenhouse gas (GHG) emissions was the production of sulfuric acid to regenerate resins, rather than transportation. Energy and GHG emissions were not significantly sensitive to the number of regeneration facilities. Cost, however, increased with decentralization as rental costs per unit area are higher for smaller areas. The metrics assessed (unit energy, GHG emissions, and cost) were not significantly influenced by facility location in this high-density urban area. We determined that this decentralized approach has lower cost, unit energy, and GHG emissions than centralized nitrogen management via nitrification-denitrification if fertilizer production offsets are taken into account.
Climate change and health costs of air emissions from biofuels and gasoline
Hill, Jason; Polasky, Stephen; Nelson, Erik; Tilman, David; Huo, Hong; Ludwig, Lindsay; Neumann, James; Zheng, Haochi; Bonta, Diego
2009-01-01
Environmental impacts of energy use can impose large costs on society. We quantify and monetize the life-cycle climate-change and health effects of greenhouse gas (GHG) and fine particulate matter (PM2.5) emissions from gasoline, corn ethanol, and cellulosic ethanol. For each billion ethanol-equivalent gallons of fuel produced and combusted in the US, the combined climate-change and health costs are $469 million for gasoline, $472–952 million for corn ethanol depending on biorefinery heat source (natural gas, corn stover, or coal) and technology, but only $123–208 million for cellulosic ethanol depending on feedstock (prairie biomass, Miscanthus, corn stover, or switchgrass). Moreover, a geographically explicit life-cycle analysis that tracks PM2.5 emissions and exposure relative to U.S. population shows regional shifts in health costs dependent on fuel production systems. Because cellulosic ethanol can offer health benefits from PM2.5 reduction that are of comparable importance to its climate-change benefits from GHG reduction, a shift from gasoline to cellulosic ethanol has greater advantages than previously recognized. These advantages are critically dependent on the source of land used to produce biomass for biofuels, on the magnitude of any indirect land use that may result, and on other as yet unmeasured environmental impacts of biofuels. PMID:19188587
Alternative Energy Science and Policy: Biofuels as a Case Study
NASA Astrophysics Data System (ADS)
Ammous, Saifedean H.
This dissertation studies the science and policy-making of alternative energy using biofuels as a case study, primarily examining the instruments that can be used to alleviate the impacts of climate change and their relative efficacy. Three case studies of policy-making on biofuels in the European Union, United States of America and Brazil are presented and discussed. It is found that these policies have had large unintended negative consequences and that they relied on Lifecycle Analysis studies that had concluded that increased biofuels production can help meet economic, energy and environmental goals. A close examination of these Lifecycle Analysis studies reveals that their results are not conclusive. Instead of continuing to attempt to find answers from Lifecycle Analyses, this study suggests an alternative approach: formulating policy based on recognition of the ignorance of real fuel costs and pollution. Policies to combat climate change are classified into two distinct approaches: policies that place controls on the fuels responsible for emissions and policies that target the pollutants themselves. A mathematical model is constructed to compare these two approaches and address the central question of this study: In light of an ignorance of the cost and pollution impacts of different fuels, are policies targeting the pollutants themselves preferable to policies targeting the fuels? It is concluded that in situations where the cost and pollution functions of a fuel are unknown, subsidies, mandates and caps on the fuel might result in increased or decreased greenhouse gas emissions; on the other hand, a tax or cap on carbon dioxide results in the largest decrease possible of greenhouse gas emissions. Further, controls on greenhouse gases are shown to provide incentives for the development and advancement of cleaner alternative energy options, whereas controls on the fuels are shown to provide equal incentives to the development of cleaner and dirtier alternative fuels. This asymmetry in outcomes---regardless of actual cost functions---is the reason why controls on greenhouse gases are deemed favorable to direct fuel subsidies and mandates.
76 FR 30925 - Information Collection; Submission for OMB Review, Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-27
.../startup): None. Total Burden Cost (operating/maintenance): None. Instrument: Application and Budget.../startup): None. Total Burden Cost (operating/maintenance): None. AmeriCorps\\*\\VISTA Project Progress...,800 hours. Total Burden Cost (capital/startup): None. Total Burden Cost (operating/maintenance): None...
Estimating cost per lane mile for routine highway operations and maintenance
DOT National Transportation Integrated Search
2011-01-01
The disparity between maintenance budgets and maintenance requirements causes agencies to make difficult choices : about maintenance priorities. There is a growing need to effectively link maintenance costs and condition to provide clear : evidence o...
Comparison of Spares Logistics Analysis Techniques for Long Duration Human Spaceflight
NASA Technical Reports Server (NTRS)
Owens, Andrew; de Weck, Olivier; Mattfeld, Bryan; Stromgren, Chel; Cirillo, William
2015-01-01
As the durations and distances involved in human exploration missions increase, the logistics associated with the repair and maintenance becomes more challenging. Whereas the operation of the International Space Station (ISS) depends upon regular resupply from the Earth, this paradigm may not be feasible for future missions. Longer mission durations result in higher probabilities of component failures as well as higher uncertainty regarding which components may fail, and longer distances from Earth increase the cost of resupply as well as the speed at which the crew can abort to Earth in the event of an emergency. As such, mission development efforts must take into account the logistics requirements associated with maintenance and spares. Accurate prediction of the spare parts demand for a given mission plan and how that demand changes as a result of changes to the system architecture enables full consideration of the lifecycle cost associated with different options. In this paper, we utilize a range of analysis techniques - Monte Carlo, semi-Markov, binomial, and heuristic - to examine the relationship between the mass of spares and probability of loss of function related to the Carbon Dioxide Removal System (CRS) for a notional, simplified mission profile. The Exploration Maintainability Analysis Tool (EMAT), developed at NASA Langley Research Center, is utilized for the Monte Carlo analysis. We discuss the implications of these results and the features and drawbacks of each method. In particular, we identify the limitations of heuristic methods for logistics analysis, and the additional insights provided by more in-depth techniques. We discuss the potential impact of system complexity on each technique, as well as their respective abilities to examine dynamic events. This work is the first step in an effort that will quantitatively examine how well these techniques handle increasingly more complex systems by gradually expanding the system boundary.
Code of Federal Regulations, 2012 CFR
2012-04-01
... increasing pressure to balance their budgets and, at the same time, respond to public demands for quality... life-cycle cost. The primary outcome of transportation management systems is improved system...)(1) and 23 U.S.C. 134(a)); congestion mitigation and air quality improvement program funds for those...
Code of Federal Regulations, 2011 CFR
2011-04-01
... increasing pressure to balance their budgets and, at the same time, respond to public demands for quality... life-cycle cost. The primary outcome of transportation management systems is improved system...)(1) and 23 U.S.C. 134(a)); congestion mitigation and air quality improvement program funds for those...
Code of Federal Regulations, 2010 CFR
2010-04-01
... increasing pressure to balance their budgets and, at the same time, respond to public demands for quality... life-cycle cost. The primary outcome of transportation management systems is improved system...)(1) and 23 U.S.C. 134(a)); congestion mitigation and air quality improvement program funds for those...
ERIC Educational Resources Information Center
Kennedy, Mike
2009-01-01
In the last several years, the growing demand that education institutions incorporate sustainable design and construction concepts in school facility plans has created a greater emphasis on using life-cycle costing. The use of long-lasting materials and equipment enables schools and universities to avoid the unnecessary consumption of energy and…
PRELIMINARY ASSESSMENT OF LIFE-CYCLE COSTS OF PROTECTIVE CLOTHING
Many different types of chemical protective clothing (CPC) are used to isolate workers at hazardous waste sites from contact with the potential hazards posed by chemical wastes. he goal in selecting the appropriate clothing for a particular occupational situation is to optimize w...
DOT National Transportation Integrated Search
1976-07-01
The Federal Railroad Administration (FRA) is sponsoring research, development, and demonstration programs to provide improved safety, performance, speed, reliability, and maintainability of rail transportation systems at reduced life-cycle costs. A m...
Influence of System Operation Method on CO2 Emissions of PV/Solar Heat/Cogeneration System
NASA Astrophysics Data System (ADS)
Oke, Shinichiro; Kemmoku, Yoshishige; Takikawa, Hirofumi; Sakakibara, Tateki
A PV/solar heat/cogeneration system is assumed to be installed in a hotel. The system is operated with various operation methods: CO2 minimum operation, fees minimum operation, seasonal operation, daytime operation and heat demand following operation. Of these five operations, the former two are virtual operations that are operated with the dynamic programming method, and the latter three are actual operations. Computer simulation is implemented using hourly data of solar radiation intensity, atmospheric temperature, electric, cooling, heating and hot water supply demands for one year, and the life-cycle CO2 emission and the total cost are calculated for every operations. The calculation results show that the virtual two and the actual three operations reduce the life-cycle CO2 emission by 21% and 13% compared with the conventional system, respectively. In regard to both the CO2 emission and the cost, there is no significant difference between the virtual two operation methods or among actual three operation methods.
An evaluation of very large airplanes and alternative fuels. Interim report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mikolowsky, W.T.; Noggle, L.W.; Hederman, W.F.
1976-12-01
Very large airplanes using alternative fuels are examined in the context of existing and possible future Air Force missions. Synthetic jet fuel (JP), liquid methane, liquid hydrogen, and nuclear propulsion are the fuel alternatives selected for detailed analysis. Conceptual designs of airplanes using each of these fuels were developed and estimates were made of their lifecycle cost and life-cycle energy consumption. Mission analyses were performed to determine the effectiveness of the alternative airplanes in strategic airlift specifically and in the station-keeping role in general. Results indicate that for most military applications airplanes with gross weights in excess of one millionmore » pounds promise to be superior to any comtemporary airplanes in terms of cost-effectiveness and energy-hydrocarbon jet fuel, whether manufactured from oil shale, coal or crude oil, remains the most attractive aviation fuel for future Air Force use. Policy recommendations are made pertaining both to alternative fuels and to advanced-technology large airplanes. Future research and developments are also identified.« less
Automation life-cycle cost model
NASA Technical Reports Server (NTRS)
Gathmann, Thomas P.; Reeves, Arlinda J.; Cline, Rick; Henrion, Max; Ruokangas, Corinne
1992-01-01
The problem domain being addressed by this contractual effort can be summarized by the following list: Automation and Robotics (A&R) technologies appear to be viable alternatives to current, manual operations; Life-cycle cost models are typically judged with suspicion due to implicit assumptions and little associated documentation; and Uncertainty is a reality for increasingly complex problems and few models explicitly account for its affect on the solution space. The objectives for this effort range from the near-term (1-2 years) to far-term (3-5 years). In the near-term, the envisioned capabilities of the modeling tool are annotated. In addition, a framework is defined and developed in the Decision Modelling System (DEMOS) environment. Our approach is summarized as follows: Assess desirable capabilities (structure into near- and far-term); Identify useful existing models/data; Identify parameters for utility analysis; Define tool framework; Encode scenario thread for model validation; and Provide transition path for tool development. This report contains all relevant, technical progress made on this contractual effort.
Integrated Power and Attitude Control Systems for Space Station
NASA Technical Reports Server (NTRS)
Oglevie, R. E.; Eisenhaure, D. B.
1985-01-01
Integrated Power and Attitude Control Systems (IPACS) studies performed over a decade ago established the feasibility of simultaneously storing electrical energy in wheels and utilizing the resulting momentum for spacecraft attitude control. It was shown that such a system possessed many advantages over other contemporary energy storage and attitude control systems in many applications. More recent technology advances in composite rotors, magnetic bearings, and power control electronics have triggered new optimism regarding the feasibility and merits of such a system. The paper presents the results of a recent study whose focus was to define an advanced IPACS and to evaluate its merits for the Space Station application. A system and component design concept is developed to establish the system performance capability. A system level trade study, including life-cycle costing, is performed to define the merits of the system relative to two other candidate systems. It is concluded that an advanced IPACS concept is not only feasible, but offers substantial savings in mass, and life-cycle cost.
[12th Annual] Maintenance & Operations Cost Study.
ERIC Educational Resources Information Center
Deriso, Jerald L.; Lane, C. Jerome
1983-01-01
Comparisons are shown between budgeted maintenance and operations costs for 1982-83 and the preceding two years' actual costs. Also provided is a summary of a 10-year comparison of net current expenditures per student, compared with maintenance and operations costs per student. Data are presented for 10 geographical regions. (MLF)
13th Annual Maintenance & Operations Cost Study.
ERIC Educational Resources Information Center
Deriso, Jerald L.
1984-01-01
Comparisons are drawn between budgeted maintenance and operations costs for 1983-84 and the preceding 2 years' actual costs. Also provided is a summary of a 10-year comparison of net current expenditures per student, compared with maintenance and operations costs per student. Data are presented for 10 geographical regions. (MLF)
Building Maintenance, Management, and Budgeting.
ERIC Educational Resources Information Center
Pawsey, M. R.
1982-01-01
Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…
75 FR 7411 - Schedule of Water Charges
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... sale revenues, while the costs of reservoir maintenance and operations, contractual services and..., ``including debt service, operation, maintenance, replacement, reserves, and associated administrative costs... holds funds dedicated to pay the costs of project construction, operation, maintenance, and replacement...
NASA Technical Reports Server (NTRS)
Cody, E. R.; Deats, C. L.; Derocher, W. L., Jr.; Kyrias, G. M.; Snodgrass, M. R.; Sosnay, R. D.; Spencer, R. A.; Wudell, A. E.
1975-01-01
Orbital maintenance concepts were examined in an effort to determine a cost effective orbital maintenance system compatible with the space transportation system. An on-orbit servicer maintenance system is recommended as the most cost effective system. A pivoting arm on-orbit servicer was selected and a preliminary design was prepared. It is indicated that orbital maintenance does not have any significant impact on the space transportation system.
Packaging of structural health monitoring components
NASA Astrophysics Data System (ADS)
Kessler, Seth S.; Spearing, S. Mark; Shi, Yong; Dunn, Christopher T.
2004-07-01
Structural Health Monitoring (SHM) technologies have the potential to realize economic benefits in a broad range of commercial and defense markets. Previous research conducted by Metis Design and MIT has demonstrated the ability of Lamb waves methods to provide reliable information regarding the presence, location and type of damage in composite specimens. The present NSF funded program was aimed to study manufacturing, packaging and interface concepts for critical SHM components. The intention is to be able to cheaply manufacture robust actuating/sensing devices, and isolate them from harsh operating environments including natural, mechanical, or electrical extremes. Currently the issues related to SHM system durability have remained undressed. During the course of this research several sets of test devices were fabricated and packaged to protect the piezoelectric component assemblies for robust operation. These assemblies were then tested in hot and wet conditions, as well as in electrically noisy environments. Future work will aim to package the other supporting components such as the battery and wireless chip, as well as integrating all of these components together for operation. SHM technology will enable the reduction or complete elimination of scheduled inspections, and will allow condition-based maintenance for increased reliability and reduced overall life-cycle costs.
Integrated testing and verification system for research flight software
NASA Technical Reports Server (NTRS)
Taylor, R. N.
1979-01-01
The MUST (Multipurpose User-oriented Software Technology) program is being developed to cut the cost of producing research flight software through a system of software support tools. An integrated verification and testing capability was designed as part of MUST. Documentation, verification and test options are provided with special attention on real-time, multiprocessing issues. The needs of the entire software production cycle were considered, with effective management and reduced lifecycle costs as foremost goals.
NASA Technical Reports Server (NTRS)
Stalnaker, Dale K.
1993-01-01
ACARA (Availability, Cost, and Resource Allocation) is a computer program which analyzes system availability, lifecycle cost (LCC), and resupply scheduling using Monte Carlo analysis to simulate component failure and replacement. This manual was written to: (1) explain how to prepare and enter input data for use in ACARA; (2) explain the user interface, menus, input screens, and input tables; (3) explain the algorithms used in the program; and (4) explain each table and chart in the output.
Life-Cycle Cost Database Design and Sample Data Development.
1981-02-01
inventory . Table 5 lists the 35 installations studied in the Red Book analysis, their MACOMs, and their geographical regions. For FY79, the total M&R cost...ACTIVITY TITLE fASJRr JUANTITY ZJS5 ACIA ACRLZYIES A 3,P 02 5 .5 .4 s e,on’.? .jo000 OPERATIO OFM U TILITIES PjP 3(R0 20,9.3 5 o.e 2 .55 .o1O0 I0TER
2015-12-01
system level testing. The WGS-6 financial data is not reported in this SAR because funding is provided by Australia in exchange for access to a...A 3831.3 3539.7 3539.7 3801.9 Confidence Level Confidence Level of cost estimate for current APB: 50% The ICE to support WGS Milestone C decision...to calculate mathematically the precise confidence levels associated with life-cycle cost estimates prepared for MDAPs. Based on the rigor in
Considerations for Solar Energy Technologies to Make Progress Towards Grid Price Parity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woodhouse, Michael; Fu, Ran; Chung, Donald
2015-11-07
In this seminar the component costs for solar photovoltaics module and system prices will be highlighted. As a basis for comparison to other renewable and traditional energy options, the metric of focus will be total lifecycle cost-of-energy (LCOE). Several innovations to traditional photovoltaics technologies (including crystalline silicon, CdTe, and CIGS) and developing technologies (including organics and perovskites) that may close the gaps in LCOE will be discussed.
Economics of Third-Party Central Heating Plants to Supply the Army
1992-01-01
Third-Party Gas-Fired Boiler Economics 52 APPENDIX C: Third-Party Gas Turbine Cogeneration Economics ( PURPA ) 58 APPENDIX D: Government Gas Turbine...Turbine Cogeneration Economics (Installation and PURPA Purchase) 76 APPENDIX G: Checklist for Identifying Optimal Third-Party Projects and Bidders 82...of scale 37 4 Relative costs of thermal energy from third-party cogeneration plants (@ 4C/kWh PURPA payment) 38 5 Comparison of life-cycle costs for
Analysis of a diesel-electric hybrid urban bus system
NASA Astrophysics Data System (ADS)
Marr, W. W.; Sekar, R. R.; Ahlheim, M. C.
A hybrid bus powered by a diesel engine and a battery pack was analyzed over an idealized bus-driving cycle in Chicago. Three hybrid configurations, two parallel and one series, were evaluated. The results indicate that the fuel economy of a hybrid bus, taking into account the regenerative braking, is comparable with that of a conventional diesel bus. Life-cycle costs are slightly higher because of the added weight and cost of the battery.
Framework for Responsible Environmental Decision-Making (FRED) demonstrates how the life-cycle concept can be used to quantify competing products' environmental performance so that this information may be integrated with considerations of total ownership cost and technical perfor...
Implementation of Integrated System Fault Management Capability
NASA Technical Reports Server (NTRS)
Figueroa, Fernando; Schmalzel, John; Morris, Jon; Smith, Harvey; Turowski, Mark
2008-01-01
Fault Management to support rocket engine test mission with highly reliable and accurate measurements; while improving availability and lifecycle costs. CORE ELEMENTS: Architecture, taxonomy, and ontology (ATO) for DIaK management. Intelligent Sensor Processes; Intelligent Element Processes; Intelligent Controllers; Intelligent Subsystem Processes; Intelligent System Processes; Intelligent Component Processes.
Small aquarium fishes provide a model organism that recapitulates the development, physiology and specific disease processes present in humans without the many limitations of rodent-based models currently in use. Fish models offer advantages in cost, rapid life-cycles, and extern...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
... Manufacturing Transformers H. Customer Subgroup Analysis I. Manufacturer Impact Analysis 1. Overview 2... Justification and Energy Savings 1. Economic Impacts on Customers a. Life-Cycle Cost and Payback Period b. Customer Subgroup Analysis c. Rebuttable-Presumption Payback 2. Economic Impact on Manufacturers a...
APPLICATION OF THE US DECISION SUPPORT TOOL FOR MATERIALS AND WASTE MANAGEMENT
EPA¿s National Risk Management Research Laboratory has led the development of a municipal solid waste decision support tool (MSW-DST). The computer software can be used to calculate life-cycle environmental tradeoffs and full costs of different waste management plans or recycling...
Murray, Ashley; Horvath, Arpad; Nelson, Kara L
2008-05-01
Sewage sludge management poses environmental, economic, and political challenges for wastewater treatment plants and municipalities around the globe. To facilitate more informed and sustainable decision making, this study used life-cycle inventory (LCI) to expand upon previous process-based LCIs of sewage sludge treatmenttechnologies. Additionally, the study evaluated an array of productive end-use options for treated sewage sludge, such as fertilizer and as an input into construction materials, to determine how the sustainability of traditional manufacturing processes changes with sludge as a replacement for other raw inputs. The inclusion of the life-cycle of necessary inputs (such as lime) used in sludge treatment significantly impacts the sustainability profiles of different treatment and end-use schemes. Overall, anaerobic digestion is generally the optimal treatment technology whereas incineration, particularly if coal-fired, is the most environmentally and economically costly. With respect to sludge end use, offsets are greatest for the use of sludge as fertilizer, but all of the productive uses of sludge can improve the sustainability of conventional manufacturing practices. The results are intended to help inform and guide decisions about sludge handling for existing wastewater treatment plants and those that are still in the planning phase in cities around the world. Although additional factors must be considered when selecting a sludge treatment and end-use scheme, this study highlights how a systems approach to planning can contribute significantly to improving overall environmental sustainability.
Costs and benefits of future heavy Space Freighters
NASA Astrophysics Data System (ADS)
Arend, H.
1987-10-01
A class of two-stage reusable ballistic Space Freighters with nominal launch masses of 7000 metric tons for transport of heavy payloads into low earth orbits is investigated in this paper with spcial regard to vehicle cost efficiency. A life-cycle cost analysis shows that Space Freighters with a conventional aluminum structure offer significantly lower specific transportation costs than today's systems for large payload markets and high launch rates. Advanced structural materials and thermal protection systems offer further important reductions not only with regard to vehicle mass but also with respect to specific transportation cost. A phased introduction of these technologies is cost efficient for larger programs with more than 100 vehicles.
Kneifel, Joshua; O'Rear, Eric; Webb, David; O'Fallon, Cheyney
2018-02-01
To conduct a more complete analysis of low-energy and net-zero energy buildings that considers both the operating and embodied energy/emissions, members of the building community look to life-cycle assessment (LCA) methods. This paper examines differences in the relative impacts of cost-optimal energy efficiency measure combinations depicting residential buildings up to and beyond net-zero energy consumption on operating and embodied flows using data from the Building Industry Reporting and Design for Sustainability (BIRDS) Low-Energy Residential Database. Results indicate that net-zero performance leads to a large increase in embodied flows (over 40%) that offsets some of the reductions in operational flows, but overall life-cycle flows are still reduced by over 60% relative to the state energy code. Overall, building designs beyond net-zero performance can partially offset embodied flows with negative operational flows by replacing traditional electricity generation with solar production, but would require an additional 8.34 kW (18.54 kW in total) of due south facing solar PV to reach net-zero total life-cycle flows. Such a system would meet over 239% of operational consumption of the most energy efficient design considered in this study and over 116% of a state code-compliant building design in its initial year of operation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huang, Runze; Riddle, Matthew; Graziano, Diane
Additive manufacturing (AM) holds great potential for improving materials efficiency, reducing life-cycle impacts, and enabling greater engineering functionality compared to conventional manufacturing (CM), and AM has been increasingly adopted by aircraft component manufacturers for lightweight, cost-effective designs. This study estimates the net changes in life-cycle primary energy and greenhouse gas emissions associated with AM technologies for lightweight metallic aircraft components through the year 2050, to shed light on the environmental benefits of a shift from CM to AM processes in the U.S. aircraft industry. A systems modeling framework is presented, with integrates engineering criteria, life-cycle environmental data, aircraft fleet stockmore » and fuel use models under different AM adoption scenarios. Estimated fleet-wide life-cycle primary energy savings at most reach 70-173 million GJ/year in 2050, with cumulative savings of 1.2–2.8 billion GJ. Associated cumulative GHG emission reductions were estimated at 92.1–215.0 million metric tons. In addition, thousands of tons of aluminum, titanium and nickel alloys could be potentially saved per year in 2050. The results indicate a significant role of AM technologies in helping society meet its long-term energy use and GHG emissions reduction goals, and highlight barriers and opportunities for AM adoption for the aircraft industry.« less
Life Cycle Costs in Education: Operations & Maintenance Considered.
ERIC Educational Resources Information Center
Moussatche, Helena; Languell-Urquhart, Jennifer; Woodson, Carol
2000-01-01
Discusses life cycle cost analysis when deciding on flooring finishes and examines operations and maintenance cost effectiveness relative to hard, resilient, and soft flooring. A chart of evaluated flooring materials' characteristics, appropriate maintenance procedures, and recommended frequency is included. (GR)
Forecasting the impact of virtual environment technology on maintenance training
NASA Technical Reports Server (NTRS)
Schlager, Mark S.; Boman, Duane; Piantanida, Tom; Stephenson, Robert
1993-01-01
To assist NASA and the Air Force in determining how and when to invest in virtual environment (VE) technology for maintenance training, we identified possible roles for VE technology in such training, assessed its cost-effectiveness relative to existing technologies, and formulated recommendations for a research agenda that would address instructional and system development issues involved in fielding a VE training system. In the first phase of the study, we surveyed VE developers to forecast capabilities, maturity, and estimated costs for VE component technologies. We then identified maintenance tasks and their training costs through interviews with maintenance technicians, instructors, and training developers. Ten candidate tasks were selected from two classes of maintenance tasks (seven aircraft maintenance and three space maintenance) using five criteria developed to identify types of tasks most likely to benefit from VE training. Three tasks were used as specific cases for cost-benefit analysis. In formulating research recommendations, we considered three aspects of feasibility: technological considerations, cost-effectiveness, and anticipated R&D efforts. In this paper, we describe the major findings in each of these areas and suggest research efforts that we believe will help achieve the goal of a cost-effective VE maintenance training system by the next decade.
Design and life-cycle considerations for unconventional-reservoir wells
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miskimins, J.L.
2009-05-15
This paper provides an overview of design and life-cycle considerations for certain unconventional-reservoir wells. An overview of unconventional-reservoir definitions is provided. Well design and life-cycle considerations are addressed from three aspects: upfront reservoir development, initial well completion, and well-life and long-term considerations. Upfront-reservoir-development issues discussed include well spacing, well orientation, reservoir stress orientations, and tubular metallurgy. Initial-well-completion issues include maximum treatment pressures and rates, treatment diversion, treatment staging, flowback and cleanup, and dewatering needs. Well-life and long-term discussions include liquid loading, corrosion, refracturing and associated fracture reorientation, and the cost of abandonment. These design considerations are evaluated with case studiesmore » for five unconventional-reservoir types: shale gas (Barnett shale), tight gas (Jonah feld), tight oil (Bakken play), coalbed methane (CBM) (San Juan basin), and tight heavy oil (Lost Hills field). In evaluating the life cycle and design of unconventional-reservoir wells, 'one size' does not fit all and valuable knowledge and a shortening of the learning curve can be achieved for new developments by studying similar, more-mature fields.« less
Life cycle assessment-driven selection of industrial ecology strategies.
Ardente, Fulvio; Cellura, Maurizio; Lo Brano, Valerio; Mistretta, Marina
2010-01-01
The paper presents an application of the Life-Cycle Assessment (LCA) to the planning and environmental management of an “eco-industrial cluster.” A feasibility study of industrial symbiosis in southern Italy is carried out, where interlinked companies share subproducts and scraps, services, structures, and plants to reduce the related environmental impact. In particular, the research focuses on new recycling solutions to create open recycling loops in which plastic subproducts and scraps are transferred to external production systems. The main environmental benefits are the reduction of resource depletion, air emissions, and landfilled wastes. The proposed strategies are also economically viable and they suggest cost abatement for the involved companies. This research shows the need for a multidisciplinary approach to data processing and to complexity managing of the investigated systems. In this context, life-cycle thinking is required to be promoted throughout the economy, as well to be as a part of all decisions on products and other criteria such as functionality, health, and safety. The Life-Cycle Assessment approach can be assumed as a methodology for influencing decision makers to make sustainable choices.
Life cycle cost analysis of aging aircraft airframe maintenance
NASA Astrophysics Data System (ADS)
Sperry, Kenneth Robert
Scope and method of study. The purpose of this study was to examine the relationship between an aircraft's age and its annual airframe maintenance costs. Common life cycle costing methodology has previously not recognized the existence of this cost growth potential, and has therefor not determined the magnitude nor significance of this cost element. This study analyzed twenty-five years of DOT Form 41-airframe maintenance cost data for the Boeing 727, 737, 747 and McDonnell Douglas DC9 and DC-10 aircraft. Statistical analysis included regression analysis, Pearson's r, and t-tests to test the null hypothesis. Findings and conclusion. Airframe maintenance cost growth was confirmed to be increasing after an aircraft's age exceeded its designed service objective of approximately twenty-years. Annual airframe maintenance cost growth increases were measured ranging from 3.5% annually for a DC-9, to approximately 9% annually for a DC-10 aircraft. Average measured coefficient of determination between age and airframe maintenance, exceeded .80, confirming a strong relationship between cost: and age. The statistical significance of the difference between airframe costs sampled in 1985, compared to airframe costs sampled in 1998 was confirmed by t-tests performed on each subject aircraft group. Future cost forecasts involving aging aircraft subjects must address cost growth due to aging when attempting to model an aircraft's economic service life.
Examination of the Open Market Corridor
2003-12-01
105 D. BENEFITS OF THE PURCHASE CARD PROGRAM ..........................107 1. List of Benefits ...107 2. Additional Benefits and How OMC Can Increase the Benefits ...107 E. WEAKNESSES OF...software licenses and support services. Estimated life-cycle costs for FY 1995 through FY 2005 are $3.7 billion. Operational benefits from SPS are
DOT National Transportation Integrated Search
2008-12-08
The objective of this research is to develop a general methodological framework for planning and : evaluating the effectiveness of highway reconstruction strategies on the systems performance : measures, in particular safety, mobility, and the tot...
ERIC Educational Resources Information Center
Morrow, Hugh
1997-01-01
Examines the decision-making factors when selecting school flooring. Areas to consider include what the area being covered is used for and the flooring's life-cycle costing. Suggestions on the types of flooring to consider are offered, as are tips on buying flooring made of recycled materials, and considerations for making the best overall…
Using Modified Fagan Inspections to Control Rapid System Development
NASA Technical Reports Server (NTRS)
Griesel, M. A.; Welz, L. L.
1994-01-01
The Jet Propulsion Laboratory (JPL) has been developing new approaches to software and system development to shorten life cycle time and reduce total life-cycle cost, while maintaining product quality. One such approach has been taken by the Just-In-Time (JIT) Materiel Acquisition System Development Project.
[The Role and Function of Informatics Nurses in Information Technology Decision-Making].
Lee, Tso-Ying
2017-08-01
The medical environment has changed greatly with the coming of the information age, and, increasingly, the operating procedures for medical services have been altered in keeping with the trend toward mobile, paperless services. Informatization has the potential to improve the working efficiency of medical personnel, enhance patient care safety, and give medical organizations a positive image. Informatics nurses play an important role in the decision-making processes that accompany informatization. As one of the decision-making links in the information technology lifecycle, this role affects the success of the development and operation of information systems. The present paper examines the functions and professional knowledge that informatics nurses must possess during the technology lifecycle, the four stages of which include: planning, analysis, design/development/revision, and implementation/assessment/support/maintenance. The present paper further examines the decision-making shortcomings and errors that an informatics nurses may make during the decision-making process. We hope that this paper will serve as an effective and useful reference for informatics nurses during the informatization decision-making process.
Eggert, D L; Nielsen, M K
2006-02-01
Three replications of mouse selection populations for high heat loss (MH), low heat loss (ML), and a nonselected control (MC) were used to estimate the feed energy costs of maintenance and gain and to test whether selection had changed these costs. At 21 and 49 d of age, mice were weighed and subjected to dual x-ray densitometry measurement for prediction of body composition. At 21 d, mice were randomly assigned to an ad libitum, an 80% of ad libitum, or a 60% of ad libitum feeding group for 28-d collection of individual feed intake. Data were analyzed using 3 approaches. The first approach was an attempt to partition energy intake between costs for maintenance, fat deposition, and lean deposition for each replicate, sex, and line by multiple regression of feed intake on the sum of daily metabolic weight (kg(0.75)), fat gain, and lean gain. Approach II was a less restrictive attempt to partition energy intake between costs for maintenance and total gain for each replicate, sex, and line by multiple regression of feed intake on the sum of daily metabolic weight and total gain. Approach III used multiple regression on the entire data set with pooled regressions on fat and lean gains, and subclass regressions for maintenance. Contrasts were conducted to test the effect of selection (MH - ML) and asymmetry of selection [(MH + ML)/2 - MC] for the various energy costs. In approach I, there were no differences between lines for costs of maintenance, fat deposition, or protein deposition, but we question our ability to estimate these accurately. In approach II, selection changed both cost of maintenance (P = 0.03) and gain (P = 0.05); MH mice had greater per unit costs than ML mice for both. Asymmetry of the selection response was found in approach II for the cost of maintenance (P = 0.06). In approach III, the effect of selection (P < 0.01) contributed to differences in the maintenance cost, but asymmetry of selection (P > 0.17) was not evident. Sex effects were found for the cost of fat deposition (P = 0.02) in approach I and the cost of gain (P = 0.001) in approach II; females had a greater cost per unit than males. When costs per unit of fat and per unit of lean gain were assumed to be the same for both sexes (approach III), females had a somewhat greater estimate for maintenance cost (P = 0.10). We conclude that selection for heat loss has changed the costs for maintenance per unit size but probably not the costs for gain.
Operation and maintenance cost data for residential photovoltaic modules/panels
NASA Technical Reports Server (NTRS)
Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.
1980-01-01
Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.
Picatinny Arsenal 3000 Area Laboratory Complex Energy Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Daryl R.; Goddard, James K.
2010-05-01
In response to a request by Picatinny Arsenal, the Pacific Northwest National Laboratory (PNNL) was asked by the Army to conduct an energy audit of the Arsenal’s 3000 Area Laboratory Complex. The objective of the audit was to identify life-cycle cost-effective measures that the Arsenal could implement to reduce energy costs. A “walk-through” audit of the facilities was conducted on December 7-8, 2009. Findings and recommendations are included in this document.
Design and analysis of aluminum/air battery system for electric vehicles
NASA Astrophysics Data System (ADS)
Yang, Shaohua; Knickle, Harold
Aluminum (Al)/air batteries have the potential to be used to produce power to operate cars and other vehicles. These batteries might be important on a long-term interim basis as the world passes through the transition from gasoline cars to hydrogen fuel cell cars. The Al/air battery system can generate enough energy and power for driving ranges and acceleration similar to gasoline powered cars. From our design analysis, it can be seen that the cost of aluminum as an anode can be as low as US 1.1/kg as long as the reaction product is recycled. The total fuel efficiency during the cycle process in Al/air electric vehicles (EVs) can be 15% (present stage) or 20% (projected) comparable to that of internal combustion engine vehicles (ICEs) (13%). The design battery energy density is 1300 Wh/kg (present) or 2000 Wh/kg (projected). The cost of battery system chosen to evaluate is US 30/kW (present) or US$ 29/kW (projected). Al/air EVs life-cycle analysis was conducted and compared to lead/acid and nickel metal hydride (NiMH) EVs. Only the Al/air EVs can be projected to have a travel range comparable to ICEs. From this analysis, Al/air EVs are the most promising candidates compared to ICEs in terms of travel range, purchase price, fuel cost, and life-cycle cost.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The purpose of this analysis is to provide information necessary for the Department of Energy (DOE) to evaluate the practical utility of the Nitrate to Ammonia and Ceramic or Glass (NAC/NAG/NAX) process, which is under development in the Oak Ridge National Laboratory. The NAC/NACx/NAX process can convert aqueous radioactive nitrate-laden waste to a glass, ceramic, or grout solid waste form. The tasks include, but are not limited to, the following: Identify current commercial technologies to meet hazardous and radiological waste disposal requirements. The technologies may be thermal or non-thermal but must be all inclusive (i.e., must convert a radionuclide-containing nitratemore » waste with a pH around 12 to a stable form that can be disposed at permitted facilities); evaluate and compare DOE-sponsored vitrification, grouting, and minimum additive waste stabilization projects for life-cycle costs; compare the technologies above with respect to material costs, capital equipment costs, operating costs, and operating efficiencies. For the NAC/NAG/NAX process, assume aluminum reactant is government furnished and ammonia gas may be marketed; compare the identified technologies with respect to frequency of use within DOE for environmental management applications with appropriate rationale for use; Assess the potential size of the DOE market for the NAC/NAG/NAX process; assess and off-gas issues; and compare with international technologies, including life-cycle estimates.« less
Effertz, Tobias; Engel, Susanne; Verheyen, Frank; Linder, Roland
2016-12-01
With the steadily growing health burden of obesity in Germany, the measuring and quantification of its costs and relevant economic consequences have become increasingly important. The usual quantifications via previous cost-of-illness approaches mostly have several weaknesses, e.g., applying "indirect methods" by using "population-attributable fractions" to identify parts of costs that can be accrued to obesity, second using highly aggregated data and third often only displaying part of the costs. This article presents a new approach and a new estimation of the cost and consequences of obesity in Germany using claims data from a German health insurance company. A sample of 146,000 individuals was analyzed with both a prevalence and a life-cycle focus on the cost and consequences of obesity. With additional data sets, we calculate the deaths per year due to obesity, the excess costs per year and several intangible consequences usually referred to as "pain and suffering". Our results show that the cost estimations of obesity in Germany so far have been largely underestimated. The annual direct costs of obesity in Germany amount to approximately €29.39 billion and the indirect costs to an additional €33.65 billion. A total of 102,000 subjects die prematurely each year because of obesity, and there is a significant excess of unemployment, long-term nursing care, and pain and suffering due to obesity. From a lifetime perspective, every obese man is equal to an additional burden of €166,911 and each woman of €206,526 for the social security system in Germany. Obesity due to unhealthy eating is thus about to replace tobacco consumption in terms of costs and consequences as the main hazardous lifestyle factor and thus should be more intensively focussed by public health policy.
Development of a maintenance cost index : final project report.
DOT National Transportation Integrated Search
2016-08-15
Maintenance activities account for a substantial portion of the life cycle costs of a roadway and are categorized by means of performance: contract maintenance by outside forces or in-house maintenance by DOT personnel and equipment. The nature and t...
Costs of performance based maintenance for local roads: Case study Albania
NASA Astrophysics Data System (ADS)
Jokanović, Igor; Grujić, Bojana; Zeljić, Dragana; Grujić, Žarko; Svilar, Mila
2017-12-01
The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inadequate local roads maintenance in Albania is proposed to be solved by implementing performance based maintenance approach for which the costing exercise is presented within the paper.
The cost of biomedical equipment repair and maintenance: results of a survey.
Cohen, T
1982-01-01
The survey presented in this paper shows that for 19 large hospitals the average ratio of equipment repair costs to acquisition cost was 7.4%. In addition, this survey shows that costs such as rent for building space, utilities, and test equipment are not included in many clinical engineering department budgets. This is one reason for the divergent cost data reported by the various hospitals. These costs should be considered particularly for comparisons between in-house service costs and other sources of service. It seems that, of the indicators observed in this survey, equipment acquisition cost provides the best indicator for equipment maintenance costs. All hospital finance officers should have acquisition value information, because this information is used in calculating capital equipment depreciation. This information should also be available to clinical engineers. In addition, procedures need to be set up so that the total annual repair and maintenance costs can be easily obtained from hospital finance departments. Providing the clinical engineer with this type of data will allow further analysis of repair cost and will aid in long-term planning for the hospital. The ratio of equipment repair cost to acquisition value may be useful as a tool to predict future costs of a given hospital's medical equipment maintenance. This tool may also be useful as a measurement of the effectiveness of a change in a hospital's approach to biomedical equipment maintenance. Further work must be done to standardize equipment maintenance cost reporting so that more detailed comparisons can be made.
Water-supply options in arsenic-affected regions in Cambodia: targeting the bottom income quintiles.
Chamberlain, Jim F; Sabatini, David A
2014-08-01
In arsenic-affected regions of Cambodia, rural water committees and planners can choose to promote various arsenic-avoidance and/or arsenic-removal water supply systems. Each of these has different costs of providing water, subsequently born by the consumer in order to be sustainable. On a volumetric basis ($/m3-yr) and of the arsenic-avoidance options considered, small-scale public water supply - e.g., treated water provided to a central tap stand - is the most expensive option on a life-cycle cost basis. Rainwater harvesting, protected hand dug wells, and vendor-supplied water are the cheapest with a normalized present worth value, ranging from $2 to $10 per cubic meter per year of water delivered. Subsidization of capital costs is needed to make even these options affordable to the lowest (Q5) quintile. The range of arsenic-removal systems considered here, using adsorptive media, is competitive with large-scale public water supply and deep tube well systems. Both community level and household-scale systems are in a range that is affordable to the Q4 quintile, though more research and field trials are needed. At a target cost of $5.00/m3, arsenic removal systems will compete with the OpEx costs for most of the arsenic-safe water systems that are currently available. The life-cycle cost approach is a valuable method for comparing alternatives and for assessing current water supply practices as these relate to equity and the ability to pay. Copyright © 2013 Elsevier B.V. All rights reserved.
How to Cut Landscape Maintenance Costs.
ERIC Educational Resources Information Center
Brickman, Dick
1982-01-01
A landscape architect explains how maintenance requirements and costs are affected by landscape design, the physical demands of the site, and the relative use of grass, ground cover, shrubs, and trees. The relationship of these factors to initial and ongoing maintenance costs, including staff requirements, is discussed. (MLF)
40 CFR 610.23 - Operator interaction effects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... degree of sensitivity of device effectiveness to variances in installation, operation and maintenance; (b..., operation and maintenance; (c) The extent to which device installation or use, or the effects of such... between total cost of ownership of the device (purchase price plus maintenance costs) and the cost savings...
The 1988 Inland Waterway Review
1988-11-01
Maintenance Costs ............. 91 Table 4.3 Major Rehabilitation Projects: ............................... 92 Table 4.4 Scheduled Constructed Projects in the...Maintenance Costs .......................... 100 Figure 4.7 Operations and Maintenance Costs Per Ton Mile in 1986 For Inland Waterways Suspect to Fuel Tax...application of study and construction cost -sharing. It also increased waterway fuel taxes and created the Inland Waterways Users Board. In effect, the Act
43 CFR 426.23 - Recovery of operation and maintenance (O&M) costs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Recovery of operation and maintenance (O&M... operation and maintenance (O&M) costs. (a) General. All new, amended, and renewed contracts shall provide for payment of O&M costs as specified in this section. (b) Amount of O&M costs a district must pay if...
43 CFR 404.40 - What is the non-Federal share of operation, maintenance, and replacement costs?
Code of Federal Regulations, 2010 CFR
2010-10-01
... Cost-Sharing § 404.40 What is the non-Federal share of operation, maintenance, and replacement costs? You are required to pay 100 percent of the operation, maintenance, and replacement costs of any rural... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the non-Federal share of operation...
A Holistic Approach to Systems Development
NASA Technical Reports Server (NTRS)
Wong, Douglas T.
2008-01-01
Introduces a Holistic and Iterative Design Process. Continuous process but can be loosely divided into four stages. More effort spent early on in the design. Human-centered and Multidisciplinary. Emphasis on Life-Cycle Cost. Extensive use of modeling, simulation, mockups, human subjects, and proven technologies. Human-centered design doesn t mean the human factors discipline is the most important Disciplines should be involved in the design: Subsystem vendors, configuration management, operations research, manufacturing engineering, simulation/modeling, cost engineering, hardware engineering, software engineering, test and evaluation, human factors, electromagnetic compatibility, integrated logistics support, reliability/maintainability/availability, safety engineering, test equipment, training systems, design-to-cost, life cycle cost, application engineering etc. 9
Reducing the complexity of NASA's space communications infrastructure
NASA Technical Reports Server (NTRS)
Miller, Raymond E.; Liu, Hong; Song, Junehwa
1995-01-01
This report describes the range of activities performed during the annual reporting period in support of the NASA Code O Success Team - Lifecycle Effectiveness for Strategic Success (COST LESS) team. The overall goal of the COST LESS team is to redefine success in a constrained fiscal environment and reduce the cost of success for end-to-end mission operations. This goal is more encompassing than the original proposal made to NASA for reducing complexity of NASA's Space Communications Infrastructure. The COST LESS team approach for reengineering the space operations infrastructure has a focus on reversing the trend of engineering special solutions to similar problems.
Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Enbar, Nadav; Weng, Dean; Klise, Geoffrey Taylor
2016-01-01
With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives onmore » current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefit the industry at-large.« less
Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Enbar, Nadav; Weng, Dean; Klise, Geoffrey Taylor
2015-12-01
With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives onmore » current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefi t the industry at-large.« less
Optimizing preventive maintenance policy: A data-driven application for a light rail braking system.
Corman, Francesco; Kraijema, Sander; Godjevac, Milinko; Lodewijks, Gabriel
2017-10-01
This article presents a case study determining the optimal preventive maintenance policy for a light rail rolling stock system in terms of reliability, availability, and maintenance costs. The maintenance policy defines one of the three predefined preventive maintenance actions at fixed time-based intervals for each of the subsystems of the braking system. Based on work, maintenance, and failure data, we model the reliability degradation of the system and its subsystems under the current maintenance policy by a Weibull distribution. We then analytically determine the relation between reliability, availability, and maintenance costs. We validate the model against recorded reliability and availability and get further insights by a dedicated sensitivity analysis. The model is then used in a sequential optimization framework determining preventive maintenance intervals to improve on the key performance indicators. We show the potential of data-driven modelling to determine optimal maintenance policy: same system availability and reliability can be achieved with 30% maintenance cost reduction, by prolonging the intervals and re-grouping maintenance actions.
Optimizing preventive maintenance policy: A data-driven application for a light rail braking system
Corman, Francesco; Kraijema, Sander; Godjevac, Milinko; Lodewijks, Gabriel
2017-01-01
This article presents a case study determining the optimal preventive maintenance policy for a light rail rolling stock system in terms of reliability, availability, and maintenance costs. The maintenance policy defines one of the three predefined preventive maintenance actions at fixed time-based intervals for each of the subsystems of the braking system. Based on work, maintenance, and failure data, we model the reliability degradation of the system and its subsystems under the current maintenance policy by a Weibull distribution. We then analytically determine the relation between reliability, availability, and maintenance costs. We validate the model against recorded reliability and availability and get further insights by a dedicated sensitivity analysis. The model is then used in a sequential optimization framework determining preventive maintenance intervals to improve on the key performance indicators. We show the potential of data-driven modelling to determine optimal maintenance policy: same system availability and reliability can be achieved with 30% maintenance cost reduction, by prolonging the intervals and re-grouping maintenance actions. PMID:29278245
Moore, Harriet E.; Boldero, Jennifer
2017-01-01
Policy makers draw on behavioral research to design interventions that promote the voluntary adoption of environmental behavior in societies. Many environmental behaviors will only be effective if they are maintained over the long-term. In the context of climate change and concerns about future water security, behaviors that involve reducing energy consumption and improving water quality must be continued indefinitely to mitigate global warming and preserve scarce resources. Previous reviews of environmental behavior have focused exclusively on factors related to adoption. This review investigates the factors that influence both adoption and maintenance, and presents a classification of environmental behaviors in terms of the activities, costs, and effort required for both adoption and maintenance. Three categories of behavior are suggested. One-off behaviors involve performing an activity once, such as purchasing an energy efficient washing machine, or signing a petition. Continuous behaviors involve the performance of the same set of behaviors for adoption and for maintenance, such as curbside recycling. Dynamic behaviors involve the performance of different behaviors for adoption and maintenance, such as revegetation. Behaviors can also be classified into four categories related to cost and effort: those that involve little cost and effort for adoption and maintenance, those that involve moderate cost and effort for adoption and maintenance, those that involve a high cost or effort for adoption and less for maintenance, and those that involve less cost or effort for adoption and a higher amount for maintenance. In order to design interventions that last, policy makers should consider the factors that influence the maintenance as well as the adoption of environmental behaviors. PMID:29163265
Noise Costs from Road Transport
NASA Astrophysics Data System (ADS)
Margorínová, Martina; Trojanová, Mária; Decký, Martin; Remišová, Eva
2018-06-01
Building and improving road infrastructure in Slovakia is currently influenced by the amount of state funding. Therefore, it is necessary to determine the effectiveness of each proposed solution of road project, which is based on life-cycle costs. Besides capital costs, social costs are also important, which valued the negative impacts due to road construction and operation on road users, the environment, and the population living in the affected area. Some components of social costs have shortcomings in quantifying and valuating, which need to be resolved. The one of important components which affects human health and the value of an area, and have some shortcomings are noise costs. Improvement of this component will lead to more accurate valuation of economic efficiency of roads.
The paper discusses a computer-based decision support tool that has been developed to assist local governments in evaluating the cost and environmental performance of integrated municipal solid waste (MSW) managment systems. ongoing case studies of the tool at the local level are...
Intelligent Tools for Planning Knowledge base Development and Verification
NASA Technical Reports Server (NTRS)
Chien, Steve A.
1996-01-01
A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.
Static and Completion Analysis for Planning Knowledge Base Development and Verification
NASA Technical Reports Server (NTRS)
Chien, Steve A.
1996-01-01
A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.
77 FR 57949 - Federal Acquisition Regulation; Positive Law Codification of Title 41
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-18
..., environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the... Work Hours and 40 U.S.C. chapter 37 Contract Work Hours Safety Standards Act. and Safety Standards... at improving performance, reliability, quality, safety, and life-cycle costs 41 U.S.C. 1711). For use...
NASA Technical Reports Server (NTRS)
Palguta, T.; Bradley, W.; Stockton, T.
1988-01-01
The purpose is to outline an Office of Space Science and Applications (OSSA) integrated logistics support strategy that will ensure effective logistics support of OSSA payloads at an affordable life-cycle cost. Program objectives, organizational relationships, and implementation of the logistics strategy are discussed.
Using Sensor-based Demand Controlled Ventilation to Realize Energy Savings in Laboratories
2014-03-27
is warranted. The results show that a DCV system is life-cycle cost effective for many different HVAC system total pressure and square footage ...Name and Description of System Sensors ......................................................... 44 Table 5. BEL Laboratory HVAC Zones, Square Footage ...Intensity ............................................................................. 74 Table 9. Range of USAF Laboratory Square Footage and Occupancy
Wheel configurations for combined energy storage and attitude control systems
NASA Technical Reports Server (NTRS)
Oglevie, R. E.
1985-01-01
Integrated power and attitude control system (IPACS) studies performed over a decade ago established the feasibility of simultaneously storing electrical energy in wheels and utilizing the resulting momentum for spacecraft attitude control. It was shown that such a system possessed many advantages over other contemporary energy storage and attitude control systems in many applications. More recent technology advances in composite rotors, magnetic bearings, and power control electronics have triggered new optimism regarding the feasibility and merits of such a system. This paper presents the results of a recent study whose focus was to define an advanced IPACS and to evaluate its merits for the Space Station application. Emphasis is given to the selection of the wheel configuration to perform the combined functions. A component design concept is developed to establish the system performance capability. A system-level trade study, including life-cycle costing, is performed to define the merits of the system relative to two other candidate systems. It is concluded that an advanced IPACS concept is not only feasible but offers substantial savings in mass and life-cycle cost.
30 CFR 206.259 - Determination of washing allowances.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Allowable maintenance expenses include: Maintenance of the wash plant; maintenance of equipment; maintenance..., or a cost equal to the depreciable investment in the wash plant multiplied by the rate of return in... depreciable fixed assets (including costs of delivery and installation of capital equipment) which are an...
NASA Technical Reports Server (NTRS)
Deo, Ravi; Wang, Donny; Bohlen, Jim; Fukuda, Cliff
2008-01-01
A trade study was conducted to determine the suitability of composite structures for weight and life cycle cost savings in primary and secondary structural systems for crew exploration vehicles, crew and cargo launch vehicles, landers, rovers, and habitats. The results of the trade study were used to identify and rank order composite material technologies that can have a near-term impact on a broad range of exploration mission applications. This report recommends technologies that should be developed to enable usage of composites on Vision for Space Exploration vehicles towards mass and life-cycle cost savings.
ECONOMIC EVALUATION OF CO2 STORAGE AND SINK ENHANCEMENT OPTIONS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bert Bock; Richard Rhudy; Howard Herzog
2003-02-01
This project developed life-cycle costs for the major technologies and practices under development for CO{sub 2} storage and sink enhancement. The technologies evaluated included options for storing captured CO{sub 2} in active oil reservoirs, depleted oil and gas reservoirs, deep aquifers, coal beds, and oceans, as well as the enhancement of carbon sequestration in forests and croplands. The capture costs for a nominal 500 MW{sub e} integrated gasification combined cycle plant from an earlier study were combined with the storage costs from this study to allow comparison among capture and storage approaches as well as sink enhancements.
2016-04-30
manufacturing is also commonly referred to as 3D printing . AM differs radically from the currently dominant manufacturing methodologies. Most current...referred to as 3D printing . In the automotive industry, Ford Motor Co. uses 3D printing in several areas, including the tooling used to create production...four months and cost $500,000 to build, while a 3D - printed manifold prototype costs $3,000 to build over four days. Additive Manufacturing in the
2012-11-02
Scanning Technology (3D LST) and Collaborative Product Lifecycle Management (CPLM) are two technologies that are currently being leveraged by international ... international ship construction organizations to achieve significant cost savings. 3D LST dramatically reduces the time required to scan ship surfaces as...technology does not meet the accuracy requirements, 0.030” accuracy minimum , for naval shipbuilding. The report delivered to the CSNT shows that if the
43 CFR 426.23 - Recovery of operation and maintenance (O&M) costs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... operation and maintenance (O&M) costs. (a) General. All new, amended, and renewed contracts shall provide... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Recovery of operation and maintenance (O&M) costs. 426.23 Section 426.23 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dobson, D; Churby, A; Krieger, E
2011-07-25
The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtualmore » model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.« less
Repair of Composites: Design Choices Leading to Lower Life-Cycle Cost
NASA Astrophysics Data System (ADS)
Kassapoglou, Christos; Rangelov, Konstantin; Rangelov, Svilen
2017-08-01
The fabrication cost of composite aircraft structures is revisited and the effect of part size on cost is examined with emphasis on design decisions which affect the ease of (bonded) repair and the total cost of the part and subsequent repairs. The case of moderately loaded stiffened fuselage or wing panels under compression is analysed in detail and the fabrication cost of the panel made as a single piece or as an assembly of smaller identical components or modules is determined. The cost of special purpose repairs for two different damage sizes is compared to removing and replacing damaged modules. Hand layup and automated processing are compared. It is found that for certain repair sizes removing and replacing modules leads to lower overall cost as compared to applying a special purpose repair.
NASA Technical Reports Server (NTRS)
Handley, Thomas H., Jr.
1993-01-01
The issues of how to avoid future surprise growth in Mission Operations and Data Analysis (MO&DA) costs and how to minimize total MO&DA costs for planetary missions are discussed within the context of JPL mission operations support. It is argued that there is no simple, single solution: the entire Project life-cycle must be addressed. It is concluded that cost models that can predict both MO&DA cost as well as Ground System development costs are needed. The first year MO&DA budget plotted against the total of ground and flight systems developments is shown. In order to better recognize changes and control costs in general, a modified funding line item breakdown is recommended to distinguish between development costs (prelaunch and postlaunch) and MO&DA costs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crawford, Alasdair J.; Huang, Qian; Kintner-Meyer, Michael C. W.
Li-ion batteries play a vital role in stabilizing the electrical grid. In this work, two different Li-ion battery chemistries based on LiNi0.8Co0.15Al0.05O2 (NCA) and LiFePO4 (LFP) cathodes have been tested under the grid duty cycles recently developed for frequency regulation (FR) and peak shaving (PS) with and without being subjected to electric vehicle (EV) drive cycles. The lifecycle comparison derived from capacity, round trip efficiency (RTE), resistance, charge/discharge energy and total utilized energy of the two battery chemistries have been discussed. The results can be used as a guideline for selection, deployment, operation and cost analyses of Li-ion batteries usedmore » for different applications.« less
2014-05-01
1 Potential Cost Savings with 3D Printing Combined With 3D Imaging and CPLM for Fleet Maintenance and Revitalization David N. Ford...2014 4. TITLE AND SUBTITLE Potential Cost Savings with 3D Printing Combined With 3D Imaging and CPLM for Fleet Maintenance and Revitalization 5a...Manufacturing ( 3D printing ) 2 Research Context Problem: Learning curve savings forecasted in SHIPMAIN maintenance initiative have not materialized
Ip, Kenneth; She, Kaiming; Adeyeye, Kemi
2017-10-18
Recovering heat from waste water discharged from showers to preheat the incoming cold water has been promoted as a cost-effective, energy-efficient, and low-carbon design option which has been included in the UK's Standard Assessment Procedure (SAP) for demonstrating compliance with the Building Regulation for dwellings. Incentivized by its carbon cost-effectiveness, waste water heat exchangers (WWHX) have been selected and incorporated in a newly constructed Sports Pavilion at the University of Brighton in the UK. This £2-m sports development serving several football fields was completed in August 2015 providing eight water- and energy-efficient shower rooms for students, staff, and external organizations. Six of the shower rooms are located on the ground floor and two on the first floor, each fitted with five or six thermostatically controlled shower units. Inline type of WWHX were installed, each consisted of a copper pipe section wound by an external coil of smaller copper pipe through which the cold water would be warmed before entering the shower mixers. Using the installation at Sport Pavilion as the case study, this research aims to evaluate the environmental and financial sustainability of a vertical waste heat recovery device, over a life cycle of 50 years, with comparison to the normal use of a PVC-u pipe. A heat transfer mathematical model representing the system has been developed to inform the development of the methodology for measuring the in-situ thermal performance of individual and multiple use of showers in each changing room. Adopting a system thinking modeling technique, a quasi-dynamic simulation computer model was established enabling the prediction of annual energy consumptions under different shower usage profiles. Data based on the process map and inventory of a functional unit of WWHX were applied to a proprietary assessment software to establish the relevant outputs for the life-cycle environmental impact assessment. Life-cycle cost models were developed and industry price book data were applied. The results indicated that the seasonal thermal effectiveness was over 50% enabling significant energy savings through heat recovery that led to short carbon payback time of less than 2 years to compensate for the additional greenhouse gas emissions associated with the WWHX. However, the life-cycle cost of the WWHX is much higher than using the PVC pipe, even with significant heat recovered under heavy usage, highlighting the need to adopt more economic configurations, such as combining waste water through fewer units, in order to maximize the return on investment and improve the financial viability.
Operation and maintenance cost-cutting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hollingshead, T.W.
This presentation by Timothy W. Hollingshead, Technical Services Manager, Pacific Gas and Electric, is about cutting costs in the Operation and Maintenance phase of geothermal energy production. The necessity of cost control, keeping workers well-trained and avoiding OSHA fines, taking advantages of new technologies, and establishing predictive maintenance programs are some of the issues discussed in this article.
Cost Analysis of Maintenance Programs for Pre-Positioned War Reserve Material Stock (PWRMS)
2002-06-01
perform electronic engine diagnosis and repair, complete engine and transmission rebuilding, powertrain and suspension work, bodywork , painting, and...cost is reimbursed by N44 • Any cost of breakdown maintenance such as transmission or engine failure. • Any cost of accident repair such as bodywork ...equipment in other TOA designators (TA10, P35, etc.) or any other maintenance such as corrective, breakdown, bodywork , or SLEP. Further studies need
Determination of the flight equipment maintenance costs of commuter airlines
NASA Technical Reports Server (NTRS)
1977-01-01
Labor and materials costs associated with maintaining and operating 12 commuter airlines carrying an average of from 42 to 1,100 passengers daily in a variety of aircraft types were studied to determine the total direct maintenance cost per flight hour for the airframe, engine, and avionics and other instruments. The distribution of maintenance costs are analyzed for two carriers, one using turboprop aircraft and the other using piston engine aircraft.
Leahey, Tricia M; Fava, Joseph L; Seiden, Andrew; Fernandes, Denise; Doyle, Caroline; Kent, Kimberly; La Rue, Molly; Mitchell, Marc; Wing, Rena R
2016-11-01
Weight loss maintenance is a significant challenge in obesity treatment. During maintenance the "costs" of adhering to weight management behaviors may outweigh the "benefits." This study examined the efficacy of a novel approach to weight loss maintenance based on modifying the cost-benefit ratio. Individuals who achieved a 5% weight loss (N=75) were randomized to one of three, 10-month maintenance interventions. All interventions were delivered primarily via the Internet. The Standard arm received traditional weight maintenance strategies. To increase benefits, or rewards, for maintenance behaviors, the two cost-benefit intervention conditions received weekly monetary rewards for self-monitoring and social reinforcement via e-coaching. To decrease behavioral costs (boredom) and increase novelty, participants in the cost-benefit conditions also monitored different evidence-based behaviors every two weeks (e.g., Weeks 1 & 2: steps; Week 3 & 4: red foods). The primary difference between the cost-benefit interventions was type of e-coach providing social reinforcement: Professional (CB Pro) or Peer (CB Peer). Study procedures took place in Providence, RI from 2013 to 2014. Retention was 99%. There were significant group differences in weight regain (p=.01). The Standard arm gained 3.5±5.7kg. In contrast, participants in CB Pro and CB Peer lost an additional 1.8±7.0kg and 0.5±6.4kg, respectively. These results suggest that an Internet delivered cost-benefit approach to weight loss maintenance may be effective for long-term weight control. In addition, using peer coaches to provide reinforcement may be a particularly economic alternative to professionals. These data are promising and provide support for a larger, longer trial. Copyright © 2016 Elsevier Inc. All rights reserved.
Logistics, Costs, and GHG Impacts of Utility-Scale Co-Firing with 20% Biomass
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nichol, Corrie Ian
This study analyzes the possibility that biopower in the U.S. is a cost-competitive option to significantly reduce greenhouse gas emissions. In 2009, net greenhouse gas (GHG) emitted in the United States was equivalent to 5,618 million metric tons CO 2, up 5.6% from 1990 (EPA 2011). Coal-fired power generation accounted for 1,748 million metric tons of this total. Intuitively, life-cycle CO 2 emissions in the power sector could be reduced by substituting renewable biomass for coal. If just 20% of the coal combusted in 2009 had been replaced with biomass, CO 2 emissions would have been reduced by 350 millionmore » metric tons, or about 6% of net annual GHG emission. This would have required approximately 225 million tons of dry biomass. Such an ambitious fuel substitution would require development of a biomass feedstock production and supply system tantamount to coal. This material would need to meet stringent specifications to ensure reliable conveyance to boiler burners, efficient combustion, and no adverse impact on heat transfer surfaces and flue gas cleanup operations. Therefore, this report addresses the potential cost/benefit tradeoffs of co-firing 20% specification-qualified biomass (on an energy content basis) in large U.S. coal-fired power plants. The dependence and sensitivity of feedstock cost on source of material, location, supply distance, and demand pressure was established. Subsequently, the dependence of levelized cost of electricity (LCOE) on feedstock costs, power plant feed system retrofit, and impact on boiler performance was determined. Overall life-cycle assessment (LCA) of greenhouse gas emissions saving were next evaluated and compared to wind and solar energy to benchmark the leading alternatives for meeting renewable portfolio standards (or RPS).« less
Development and Validation of a Lifecycle-based Prognostics Architecture with Test Bed Validation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hines, J. Wesley; Upadhyaya, Belle; Sharp, Michael
On-line monitoring and tracking of nuclear plant system and component degradation is being investigated as a method for improving the safety, reliability, and maintainability of aging nuclear power plants. Accurate prediction of the current degradation state of system components and structures is important for accurate estimates of their remaining useful life (RUL). The correct quantification and propagation of both the measurement uncertainty and model uncertainty is necessary for quantifying the uncertainty of the RUL prediction. This research project developed and validated methods to perform RUL estimation throughout the lifecycle of plant components. Prognostic methods should seamlessly operate from beginning ofmore » component life (BOL) to end of component life (EOL). We term this "Lifecycle Prognostics." When a component is put into use, the only information available may be past failure times of similar components used in similar conditions, and the predicted failure distribution can be estimated with reliability methods such as Weibull Analysis (Type I Prognostics). As the component operates, it begins to degrade and consume its available life. This life consumption may be a function of system stresses, and the failure distribution should be updated to account for the system operational stress levels (Type II Prognostics). When degradation becomes apparent, this information can be used to again improve the RUL estimate (Type III Prognostics). This research focused on developing prognostics algorithms for the three types of prognostics, developing uncertainty quantification methods for each of the algorithms, and, most importantly, developing a framework using Bayesian methods to transition between prognostic model types and update failure distribution estimates as new information becomes available. The developed methods were then validated on a range of accelerated degradation test beds. The ultimate goal of prognostics is to provide an accurate assessment for RUL predictions, with as little uncertainty as possible. From a reliability and maintenance standpoint, there would be improved safety by avoiding all failures. Calculated risk would decrease, saving money by avoiding unnecessary maintenance. One major bottleneck for data-driven prognostics is the availability of run-to-failure degradation data. Without enough degradation data leading to failure, prognostic models can yield RUL distributions with large uncertainty or mathematically unsound predictions. To address these issues a "Lifecycle Prognostics" method was developed to create RUL distributions from Beginning of Life (BOL) to End of Life (EOL). This employs established Type I, II, and III prognostic methods, and Bayesian transitioning between each Type. Bayesian methods, as opposed to classical frequency statistics, show how an expected value, a priori, changes with new data to form a posterior distribution. For example, when you purchase a component you have a prior belief, or estimation, of how long it will operate before failing. As you operate it, you may collect information related to its condition that will allow you to update your estimated failure time. Bayesian methods are best used when limited data are available. The use of a prior also means that information is conserved when new data are available. The weightings of the prior belief and information contained in the sampled data are dependent on the variance (uncertainty) of the prior, the variance (uncertainty) of the data, and the amount of measured data (number of samples). If the variance of the prior is small compared to the uncertainty of the data, the prior will be weighed more heavily. However, as more data are collected, the data will be weighted more heavily and will eventually swamp out the prior in calculating the posterior distribution of model parameters. Fundamentally Bayesian analysis updates a prior belief with new data to get a posterior belief. The general approach to applying the Bayesian method to lifecycle prognostics consisted of identifying the prior, which is the RUL estimate and uncertainty from the previous prognostics type, and combining it with observational data related to the newer prognostics type. The resulting lifecycle prognostics algorithm uses all available information throughout the component lifecycle.« less
Expendable vs reusable propulsion systems cost sensitivity
NASA Technical Reports Server (NTRS)
Hamaker, Joseph W.; Dodd, Glenn R.
1989-01-01
One of the key trade studies that must be considered when studying any new space transportation hardware is whether to go reusable or expendable. An analysis is presented here for such a trade relative to a proposed Liquid Rocket Booster which is being studied at MSFC. The assumptions or inputs to the trade were developed and integrated into a model that compares the Life-Cycle Costs of both a reusable LRB and an expendable LRB. Sensitivities were run by varying the input variables to see their effect on total cost. In addition a Monte-Carlo simulation was run to determine the amount of cost risk that may be involved in a decision to reuse or expend.
NASA Astrophysics Data System (ADS)
Sembiring, N.; Panjaitan, N.; Angelita, S.
2018-02-01
PT. XYZ is a company owned by non-governmental organizations engaged in the field of production of rubber processing becoming crumb rubber. Part of the production is supported by some of machines and interacting equipment to achieve optimal productivity. Types of the machine that are used in the production process are Conveyor Breaker, Breaker, Rolling Pin, Hammer Mill, Mill Roll, Conveyor, Shredder Crumb, and Dryer. Maintenance system in PT. XYZ is corrective maintenance i.e. repairing or replacing the engine components after the crash on the machine. Replacement of engine components on corrective maintenance causes the machine to stop operating during the production process is in progress. The result is in the loss of production time due to the operator must replace the damaged engine components. The loss of production time can impact on the production targets which were not reached and lead to high loss costs. The cost for all components is Rp. 4.088.514.505. This cost is really high just for maintaining a Mill Roll Machine. Therefore PT. XYZ is needed to do preventive maintenance i.e. scheduling engine components and improving maintenance efficiency. The used methods are Reliability Engineering and Maintenance Value Stream Mapping (MVSM). The needed data in this research are the interval of time damage to engine components, opportunity cost, labor cost, component cost, corrective repair time, preventive repair time, Mean Time To Opportunity (MTTO), Mean Time To Repair (MTTR), and Mean Time To Yield (MTTY). In this research, the critical components of Mill Roll machine are Spier, Bushing, Bearing, Coupling and Roll. Determination of damage distribution, reliability, MTTF, cost of failure, cost of preventive, current state map, and future state map are done so that the replacement time for each critical component with the lowest maintenance cost and preparation of Standard Operation Procedure (SOP) are developed. For the critical component that has been determined, the Spier component replacement time interval is 228 days with a reliability value of 0,503171, Bushing component is 240 days with reliability value of 0.36861, Bearing component is 202 days with reliability value of 0,503058, Coupling component is 247 days with reliability value of 0,50108 and Roll component is 301 days with reliability value of 0,373525. The results show that the cost decreases from Rp 300,688,114 to Rp 244,384,371 obtained from corrective maintenance to preventive maintenance. While maintenance efficiency increases with the application of preventive maintenance i.e. for Spier component from 54,0540541% to 74,07407%, Bushing component from 52,3809524% to 68,75%, Bearing component from 40% to 52,63158%, Coupling component from 60.9756098% to 71.42857%, and Roll components from 64.516129% to 74.7663551%.
NASA Astrophysics Data System (ADS)
Glaubius, J.; Maerker, M.
2016-12-01
Anthropogenic landforms, such as mines and agricultural terraces, are impacted by both geomorphic and social processes at varying intensities through time. In the case of agricultural terraces, decisions regarding terrace maintenance are intertwined with land use, such as when terraced fields are abandoned. Furthermore, terrace maintenance and land use decisions, either jointly or separately, may be in response to geomorphic processes, as well as geomorphic feedbacks. Previous studies of these complex geomorphic systems considered agricultural terraces as static features or analyzed only the geomorphic response to landowner decisions. Such research is appropriate for short-term or binary landscape scenarios (e.g. the impact of maintained vs. abandoned terraces), but the complexities inherent in these socio-natural systems requires an approach that includes both social and geomorphic processes. This project analyzes feedbacks and emergent properties in terraced systems by implementing a coupled landscape evolution model (LEM) and agent-based model (ABM) using the Landlab and Mesa modeling libraries. In the ABM portion of the model, agricultural terraces are conceptualized using a life-cycle stages schema and implemented using Markov Decision Processes to simulate the changing geomorphic impact of terracing based on human decisions. This paper examines the applicability of this approach by comparing results from a LEM-only model against the coupled LEM-ABM model for a terraced region. Model results are compared by quantify and spatial patterning of sediment transport. This approach fully captures long-term landscape evolution of terraced terrain that is otherwise lost when the life-cycle of terraces is not considered. The coupled LEM-ABM approach balances both environmental and social processes so that the socio-natural feedbacks in such anthropogenic systems can be disentangled.
Perry, C M; Davis, R
1997-08-01
Cytomegalovirus retinitis, an opportunistic infection caused by the herpesvirus cytomegalovirus, is a major cause of illness in patients with advanced AIDS. As infected patients require long term drug treatment to delay disease progression and minimise loss of vision, the disease is associated with substantial treatment costs which considerably increase overall expenditure on AIDS-related health care. During the last decade, intravenous ganciclovir has been a mainstay of treatment for patients with cytomegalovirus retinitis. However, notwithstanding its demonstrated efficacy as maintenance therapy for this condition, long term intravenous drug administration is both inconvenient and uncomfortable for many patients. Moreover, neutropenia and catheter-related infections have been reported commonly in patients receiving ganciclovir via the intravenous route. To overcome the limitations of intravenous ganciclovir, an oral formulation of the drug has been developed for use as maintenance therapy. In comparative clinical trials, both intravenous and oral ganciclovir maintenance therapy slowed disease progression and preserved visual acuity in patients with stabilised cytomegalo-virus retinitis, although there was evidence that the intravenous formulation was more effective in terms of delaying recurrence of active disease. This suggests that oral ganciclovir use should be limited to the treatment of patients without evidence of immediately sight-threatening cytomegalovirus retinitis. Three published cost analyses, which were based on efficacy and tolerability data derived from 2 randomised, comparative clinical trials, have shown that oral ganciclovir maintenance therapy offers cost advantages over intravenous maintenance therapy, despite the higher acquisition cost of the oral formulation. The higher overall costs of intravenous maintenance treatment, compared with oral therapy, were attributed to higher drug administration and adverse event treatment costs. In one analysis, estimated lifetime treatment costs of oral maintenance therapy were 25.2% lower than those of intravenous maintenance treatment. As yet, no formal cost-effectiveness evaluations of oral and intravenous ganciclovir have been published. Few published data are available regarding the relative effects of intravenous and oral ganciclovir on quality of life. However, in a health state utility analysis, there was a large overall preference among HIV-infected individuals for oral over intravenous maintenance treatment. In conclusion, oral ganciclovir appears to be a cost-saving and patient-preferred alternative to its intravenous counterpart for the maintenance therapy of AIDS patients with stabilised cytomegalovirus retinitis in whom there is no evidence of sight-threatening disease.
[The financial impact of maintenance treatment in heroin addictive behavior: the case of Subutex].
Kopp, P; Rumeau-Pichon, C; Le Pen, C
2000-06-01
The development of maintenance treatment for subjects with addictive behavior is an important public health issue. As such, the social effectiveness of maintenance products must be examined from an economical and social point of view. This paper aims at presenting the financial costs involved in the use of Subutex, a product commercialized since 1996. A complete typology of costs related to drug addiction and its consequences was set up. Some of these costs were estimated on the basis of data drawn from the literature. The cost of Subutex use for maintenance treatment was assessed and compared with the financial stakes including the potential reduction of the economic and social cost of drug addiction. Monthly treatment cost of Subutex was 1252 FrF per drug abuser on maintenance treatment. By extrapolation, for a population of 40,000 drug abusers, the direct medical cost of Subutex during a course of maintenance treatment with general practitioner follow-up was estimated at 600 millions FrF. US data sources were applied to France to assess the cost of illnesses attributable to drug addiction. The cost reached 4.8 billions FrF. The cost of delinquency associated with drug addiction, which mostly concerns money laundered to purchase substances was an estimated 6.4 billions FrF. Finally, the cost of public anti-drug abuse programs was nearly 4.7 billions FrF. Thus, the direct cost of drug addiction consequences reached 15.6 billions FrF. This cost should be compared with the annual cost of Subutex for public organizations which was an estimated 600 millions FrF. The "profit" threshold of maintenance treatment with Subutex in terms of direct costs is very low. A decrease of only 4% of the costs associated with drug addiction would make it possible to balance the financial budget for the community. Our analysis does not take into acount absolutely all the public health and safety aspects involved in the use of Subutex. It does however provide a useful assessment of the financial aspects of the question and justification for this therapeutic strategy from a budgetary point of view.
Policy for equipment’s leasing period extension with minimum cost of maintenance
NASA Astrophysics Data System (ADS)
Lestari, C.; Kurniati, N.
2018-04-01
The cost structure for equipment investment including purchase cost and maintenance cost is getting more expensive. The company considers to lease the equipment instead of purchase it under a contractual agreement. Offering to extend the lease period, following to the base lease period, will provide more benefits for both the lessor (owner) and the lessee (user). Whenever the lease period extension offered at the beginning of the contract, there are some risks in finance e.g. uncertainty of the equipment performance and lessor responsibility. Therefore, this research attempts to model the optimal maintenance policy for lease period extension offered at the end of the contract. Minimal repair is performed to rectify a failed equipment, while imperfect preventive maintenance is conducted to improve the operational state of the equipment when reaches a certain control limit to avoid failures. The mathematical model is constructed to determine the optimal control limit, the number and degree of preventive maintenance, and the multiplication number of the lease period extension. Finally, numerical examples are given to illustrate the influences of the optimal length of the extended lease and the maintenance policy to minimize the maintenance cost.
An Evaluation of Facility Maintenance and Repair Strategies of Select Companies
2002-09-01
challenge for facility maintenance professionals is balancing the cost of facility Maintenance and Repair (M&R) with the benefits derived from those...maintenance professionals is balancing the cost of facility Maintenance and Repair (M&R) with the benefits derived from those facilities. This thesis...private organizations may also benefit from an analysis of the practices in use by successful corporations. The second group to benefit from this
2012-10-31
Prod uc F22 cond 1 Contract cond 2 Function cond 3 CONOPS For C2 systems, how often does Strategic Vision change? Records show that...System De cond 3 CapDef JTRS cond 1 InterOpera cond 2 Prod uctio F22 cond 1 Contract cond 2 Functional cond 3 CONOPS The Materiel
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... Prices C. Energy Use Analysis D. Life-Cycle Cost and Payback Period Analyses E. National Impact Analysis... projected energy prices and installed stock in each year. DOE calculates annual equipment expenditures by... DEPARTMENT OF ENERGY 10 CFR Part 431 [Docket No. EERE-2010-BT-STD-0043] RIN 1904-AC36 Energy...
75 FR 29933 - Energy Efficiency and Sustainable Design Standards for New Federal Buildings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... guidance, discount rates, and energy price projections are determined annually by FEMP and the Energy... Technology Handbook 135: ``Energy Price Indices and Discount Factors for Life-Cycle Cost Analysis.'' FEMP... DEPARTMENT OF ENERGY 10 CFR Parts 433 and 435 [Docket No. EE-RM/STD-02-112] RIN 1904-AC13 Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... Management. The life-cycle cost guidance and required discount rates and energy price projections are... Supplement to The National Institute of Standards and Technology Handbook 135: ``Energy Price Indices and... DEPARTMENT OF ENERGY 10 CFR Part 433 [Docket No. EERE-2011-BT-STD-0055] RIN 1904-AC60 Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
... Management. The life-cycle cost guidance and required discount rates and energy price projections are... Supplement to The National Institute of Standards and Technology Handbook 135: ``Energy Price Indices and...;Prices of new books are listed in the first FEDERAL REGISTER issue of each #0;week. #0; #0; #0; #0;#0...
A Workflow for Learning Objects Lifecycle and Reuse: Towards Evaluating Cost Effective Reuse
ERIC Educational Resources Information Center
Sampson, Demetrios G.; Zervas, Panagiotis
2011-01-01
Over the last decade Learning Objects (LOs) have gained a lot of attention as a common format for developing and sharing digital educational content in the field of technology-enhanced learning. The main advantage of LOs is considered to be their potential for component-based reuse in different learning settings supporting different learning…
Standards for space automation and robotics
NASA Technical Reports Server (NTRS)
Kader, Jac B.; Loftin, R. B.
1992-01-01
The AIAA's Committee on Standards for Space Automation and Robotics (COS/SAR) is charged with the identification of key functions and critical technologies applicable to multiple missions that reflect fundamental consideration of environmental factors. COS/SAR's standards/practices/guidelines implementation methods will be based on reliability, performance, and operations, as well as economic viability and life-cycle costs, simplicity, and modularity.
Service life assessment of timber highway bridges in USA climate zones
James P. Wacker; Brian K. Brashaw; Thomas G. Williamson; P. David Jones; Matthew S. Smith; Travis K. Hosteng; David L. Strahl; Lola E. Coombe; V.J. Gopu
2014-01-01
As engineers begin to estimate life-cycle costs and sustainable design approaches for timber bridges, there is a need for more reliable data about their durability and expected service life. This paper summarizes a comprehensive effort to assess the current condition of more than one hundred timber highway bridge superstructures throughout the United States. This...
Cost-effectiveness analysis: should it be required for drug registration and beyond?
Arnold, Renée J Goldberg
2007-11-01
Cost-effectiveness analysis (CEA) is applied in situations where trade-offs exist, typically, greater benefit for an increased cost over an alternative therapy or strategic option versus usual care. CEA is useful where a new strategy is more costly but expected to be more effective or where a new strategy is less costly but less effective. A good example for the relevance of CEA is the unanimous recommendation of a US federal vaccine advisory panel to vaccinate 11-year-old girls against cervical cancer. This recommendation was at least partly because of data showing the relative cost-effectiveness of HPV vaccine. In this era of finite budgets, CEA may facilitate drug development, drug approval, patient segmentation and pricing model development throughout the drug lifecycle continuum.
A probabilistic maintenance model for diesel engines
NASA Astrophysics Data System (ADS)
Pathirana, Shan; Abeygunawardane, Saranga Kumudu
2018-02-01
In this paper, a probabilistic maintenance model is developed for inspection based preventive maintenance of diesel engines based on the practical model concepts discussed in the literature. Developed model is solved using real data obtained from inspection and maintenance histories of diesel engines and experts' views. Reliability indices and costs were calculated for the present maintenance policy of diesel engines. A sensitivity analysis is conducted to observe the effect of inspection based preventive maintenance on the life cycle cost of diesel engines.
NASA Astrophysics Data System (ADS)
Pattabhiraman, Sriram
Airplane fuselage structures are designed with the concept of damage tolerance, wherein small damage are allowed to remain on the airplane, and damage that otherwise affect the safety of the structure are repaired. The damage critical to the safety of the fuselage are repaired by scheduling maintenance at pre-determined intervals. Scheduling maintenance is an interesting trade-off between damage tolerance and cost. Tolerance of larger damage would require less frequent maintenance and hence, a lower cost, to maintain a certain level of reliability. Alternatively, condition-based maintenance techniques have been developed using on-board sensors, which track damage continuously and request maintenance only when the damage size crosses a particular threshold. This effects a tolerance of larger damage than scheduled maintenance, leading to savings in cost. This work quantifies the savings of condition-based maintenance over scheduled maintenance. The work also quantifies converting the cost savings into weight savings. Structural health monitoring will need time to be able to establish itself as a stand-alone system for maintenance, due to concerns on its diagnosis accuracy and reliability. This work also investigates the effect of synchronizing structural health monitoring system with scheduled maintenance. This work uses on-board SHM equipment skip structural airframe maintenance (a subsect of scheduled maintenance), whenever deemed unnecessary while maintain a desired level of safety of structure. The work will also predict the necessary maintenance for a fleet of airplanes, based on the current damage status of the airplanes. The work also analyses the possibility of false alarm, wherein maintenance is being requested with no critical damage on the airplane. The work use SHM as a tool to identify lemons in a fleet of airplanes. Lemons are those airplanes that would warrant more maintenance trips than the average behavior of the fleet.
Multifunctional Hybrid Carbon Nanotube/Carbon Fiber Polymer Composites
NASA Technical Reports Server (NTRS)
Kang, Jin Ho; Cano, Roberto J.; Ratcliffe, James G.; Luong, Hoa; Grimsley, Brian W.; Siochi, Emilie J.
2016-01-01
For aircraft primary structures, carbon fiber reinforced polymer (CFRP) composites possess many advantages over conventional aluminum alloys due to their light weight, higher strengthand stiffness-to-weight ratio, and low life-cycle maintenance costs. However, the relatively low electrical and thermal conductivities of CFRP composites fail to provide structural safety in certain operational conditions such as lightning strikes. Despite several attempts to solve these issues with the addition of carbon nanotubes (CNT) into polymer matrices, and/or by interleaving CNT sheets between conventional carbon fiber (CF) composite layers, there are still interfacial problems that exist between CNTs (or CF) and the resin. In this study, hybrid CNT/CF polymer composites were fabricated by interleaving layers of CNT sheets with Hexcel® IM7/8852 prepreg. Resin concentrations from 1 wt% to 50 wt% were used to infuse the CNT sheets prior to composite fabrication. The interlaminar properties of the resulting hybrid composites were characterized by mode I and II fracture toughness testing (double cantilever beam and end-notched flexure test). Fractographical analysis was performed to study the effect of resin concentration. In addition, multi-directional physical properties like thermal conductivity of the orthotropic hybrid polymer composite were evaluated. Interleaving CNT sheets significantly improved the in-plane (axial and perpendicular direction of CF alignment) thermal conductivity of the hybrid composite laminates by 50 - 400%.