Electronic Repair Concepts for Long-Duration Spaceflight
NASA Technical Reports Server (NTRS)
Easton, John; Pettegrew, Richard D.; Struk, Peter M.
2007-01-01
Constraints on the mass and volume that can be allocated for electronics spares and repair equipment on long-duration space missions mean that NASA must look at repair strategies beyond the traditional approach, which has been to replace faulty subsystems in a modular form, termed Orbital Replacement Units or Line Replacement Units. Other possible strategies include component and board-level replacement, modular designs that allow reprogramming of less-critical systems to take the place of more critical failed systems, and a blended approach which uses elements of each of these approaches, along with a limited number of Line Replacement Units. This paper presents some of the constraints and considerations that affect the decision on how to approach electronics repair for long duration space missions, and discusses the benefits and limitations of each of the previously mentioned strategies.
ERIC Educational Resources Information Center
Rifkin, Kenneth I.; And Others
The purpose of the simulated maintenance task environment is to provide a means for training and job performance testing of the flight line weapon control systems mechanic/technician for the F-111A aircraft. It provides practice in flight line equipment checkout, troubleshooting, and removal and replacement of line replaceable units in the…
77 FR 16430 - Airworthiness Directives; Airbus Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-21
... opposite the line replaceable unit racking. This AD requires replacing a certain aluminum high pressure... proposed to require replacing a certain aluminum high pressure pipe with a new corrosion resistant... comply with paragraph (1) of this [EASA] AD, unless, inadvertently, the high pressure pipe P/N...
A replacement LH2 recirculation line before installation in Discovery
NASA Technical Reports Server (NTRS)
1999-01-01
Gary Hamilton (left) and James Stickley, both with United Space Alliance, check out a spare four-inch diameter LH2 recirculation line that will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about =-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.
A replacement LH2 recirculation line before installation in Discovery
NASA Technical Reports Server (NTRS)
1999-01-01
James Stickley (left) and Derry Dilby (right), who are with United Space Alliance, check over a spare four-inch diameter LH2 recirculation line that will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about =-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.
A dented LH2 recirculation line is removed from Discovery
NASA Technical Reports Server (NTRS)
1999-01-01
In the Payload Changeout Room, Launch Pad 39B, United Space Alliance and NASA workers look at the replacement main propulsion system liquid hydrogen recirculation line (left) to be installed in Shuttle Discovery's aft compartment. At right is the dented line that has been removed. The 12-inch-long dent was discovered during routine aft compartment inspections Tuesday, Dec. 7. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. The line is being replaced and managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.
VHSIC Electronics and the Cost of Air Force Avionics in the 1990s
1990-11-01
circuit. LRM Line replaceable module. LRU Line replaceable unit. LSI Large-scale integration. LSTTL Tow-power Schottky Transitor -to-Transistor Logic...displays, communications/navigation/identification, electronic combat equipment, dispensers, and computers. These CERs, which statistically relate the...some of the reliability numbers, and adding the F-15 and F-16 to obtain the data sample shown in Table 6. Both suite costs and reliability statistics
Replacement of fluid-filter elements without interruption of flow
NASA Technical Reports Server (NTRS)
Kotler, R. A.; Ward, J. B.
1969-01-01
Gatling-type filter assembly, preloaded with several filter elements enables filter replacement without breaking into the operative fluid system. When the filter element becomes contaminated, a unit inner subassembly is rotated 60 degrees to position a clean filter in the line.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DiCello, D.C.; Odell, A.D.; Jackson, T.J.
1995-03-01
Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished,more » and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific ({mu}Ci/cm{sup 2}) of Co-60 and Zn-65 were analyzed.« less
A dented LH2 recirculation line is removed from Discovery
NASA Technical Reports Server (NTRS)
1999-01-01
Workers with United Space Alliance remove Shuttle Discovery's dented main propulsion system liquid hydrogen recirculation line. From left are James Stickley, George Atkins, and Todd Biddle. The 12-inch-long dent was discovered during routine aft compartment inspections Tuesday, Dec. 7. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. The line is being replaced and managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.
NASA Astrophysics Data System (ADS)
Kallis, J.; Buechler, D.; Erickson, J.; Westerhuyzen, D. V.; Strokes, R.
1992-05-01
This is the first of two volumes. The other volume (WL-TR-91-3119) is 'Fracture Mechanics'. The objective of the Electronics Reliability Fracture Mechanics (ERFM) program was to develop and demonstrate a life prediction technique for electronic assemblies, when subjected to environmental stress of vibration and thermal cycling, based upon the mechanical properties of the materials and packaging configurations which make up an electronic system. A detailed investigation was performed of the following two shop replaceable units (SRUs): Timing and Control Module (P/N 3562102) and Linear Regulator Module (P/N 3569800). The SRUs are in the Programmable Signal Processor (3137042) Line Replaceable Unit (LRU) of the Hughes AN/APG-63 Radar for the F-15 Aircraft.
Optimization of replacement and inspection decisions for multiple components on a power system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mauney, D.A.
1994-12-31
The use of optimization on the rescheduling of replacement dates provided a very proactive approach to deciding when components on individual units need to be addressed with a run/repair/replace decision. Including the effects of time value of money and taxes and unit need inside the spreadsheet model allowed the decision maker to concentrate on the effects of engineering input and replacement date decisions on the final net present value (NPV). The personal computer (PC)-based model was applied to a group of 140 forced outage critical fossil plant tube components across a power system. The estimated resulting NPV of the optimizationmore » was in the tens of millions of dollars. This PC spreadsheet model allows the interaction of inputs from structural reliability risk assessment models, plant foreman interviews, and actual failure history on a by component by unit basis across a complete power production system. This model includes not only the forced outage performance of these components caused by tube failures but, in addition, the forecasted need of the individual units on the power system and the expected cost of their replacement power if forced off line. The use of cash flow analysis techniques in the spreadsheet model results in the calculation of an NPV for a whole combination of replacement dates. This allows rapid assessments of {open_quotes}what if{close_quotes} scenarios of major maintenance projects on a systemwide basis and not just on a unit-by-unit basis.« less
1999-12-06
James Stickley (left) and Derry Dilby (right), who are with United Space Alliance, check over a spare four-inch diameter LH2 recirculation line that will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about ½-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope
1999-12-09
Gary Hamilton (left) and James Stickley, both with United Space Alliance, check out a spare four-inch diameter LH2 recirculation line that will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about ½-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope
NASA Technical Reports Server (NTRS)
1975-01-01
Liquid cooled garments employed in several applications in which severe heat is encountered are discussed. In particular, the use of the garments to replace air line cooling units in a variety of industrial processing situations is discussed.
Expedition 28 Crew Members during IFM
2011-06-30
ISS028-E-010781 (30 June 2011) --- NASA astronauts Mike Fossum (left) and Ron Garan, both Expedition 28 flight engineers, perform in-flight maintenance in the Harmony node of the International Space Station. The maintenance involved removing and replacing the failed Common Cabin Air Assembly (CCAA) heat exchanger in the P3 Midbay with a new spare Heat Exchanger Orbit Replaceable Unit (HX ORU) and lines.
Program Predicts Nonlinear Inverter Performance
NASA Technical Reports Server (NTRS)
Al-Ayoubi, R. R.; Oepomo, T. S.
1985-01-01
Program developed for ac power distribution system on Shuttle orbiter predicts total load on inverters and node voltages at each of line replaceable units (LRU's). Mathematical model simulates inverter performance at each change of state in power distribution system.
A stand-replacing fire history in upper montane forests of the southern Rocky Mountains
Margolis, E.Q.; Swetnam, T.W.; Allen, Craig D.
2007-01-01
Dendroecological techniques were applied to reconstruct stand-replacing fire history in upper montane forests in northern New Mexico and southern Colorado. Fourteen stand-replacing fires were dated to 8 unique fire years (1842–1901) using four lines of evidence at each of 12 sites within the upper Rio Grande Basin. The four lines of evidence were (i) quaking aspen (Populus tremuloides Michx.) inner-ring dates, (ii) fire-killed conifer bark-ring dates, (iii) tree-ring width changes or other morphological indicators of injury, and (iv) fire scars. The annual precision of dating allowed the identification of synchronous stand-replacing fire years among the sites, and co-occurrence with regional surface fire events previously reconstructed from a network of fire scar collections in lower elevation pine forests across the southwestern United States. Nearly all of the synchronous stand-replacing and surface fire years coincided with severe droughts, because climate variability created regional conditions where stand-replacing fires and surface fires burned across ecosystems. Reconstructed stand-replacing fires that predate substantial Anglo-American settlement in this region provide direct evidence that stand-replacing fires were a feature of high-elevation forests before extensive and intensive land-use practices (e.g., logging, railroad, and mining) began in the late 19th century.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
..., Line 1: Replaced ``Street/RFD , P.O. Box, or URB'' with ``(Street/RFD , URB, or P.O. Box, Apt/Unit, In Care Of or Attn (e.g., In Care Of--Jane Doe, Apt 100))''. [cir] Mailing Address, Address Line 2... applicable. (e.g., In Care Of--Jane Doe, Apt 100)'' with ``(If applicable)''. In the photograph box, the...
1991-12-01
user using the ’: knn ’ option in the do-scenario command line). An instance of the K-Nearest Neighbor object is first created and initialized before...Navigation Computer HF High Frequency ILS Instrument Landing System KNN K - Nearest Neighbor LRU Line Replaceable Unit MC Mission Computer MTCA...approaches have been investigated here, K-nearest Neighbors ( KNN ) and neural networks (NN). Both approaches require that previously classified examples of
NASA Shuttle Logistics Depot (NSLD) - The application of ATE
NASA Technical Reports Server (NTRS)
Simpkins, Lorenz G.; Jenkins, Henry C.; Mauceri, A. Jack
1990-01-01
The concept of the NASA Shuttle Logistics Depot (NSLD) developed for the Space Shuttle Orbiter Program is described. The function of the NSLD at Cape Canaveral is to perform the acceptance and diagnostic testing of the Shuttle's space-rated line-replaceable units and shop-replaceable units (SRUs). The NSLD includes a comprehensive electronic automatic test station, program development stations, and assorted manufacturing support equipment (including thermal and vibration test equipment, special test equipment, and a card SRU test system). The depot activities also include the establishment of the functions for manufacturing of mechanical parts, soldering, welding, painting, clean room operation, procurement, and subcontract management.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.
It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformersmore » may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.« less
Lafreniere, Janet A; Hamilton, Donald P; Carr, Roxane R
2006-10-01
To examine the practice of potassium chloride (KCl) replacement in pediatric oncology patients receiving amphotericin B (amp-B). A retrospective observational chart review was conducted of patients who received amp-B on the oncology unit between August 2000 and May 2001. A survey was distributed to pediatric oncology pharmacists at other pediatric institutions to assess KCl infusion guidelines across North America. Twenty hypokalemic episodes were identified within 22 patient admissions. Fifty-five percent used KCl replacement (by all combined routes) at rates exceeding the institution's guidelines. Other pediatric institutions varied with respect to the maximum rates and concentration of KCl permitted on non-intensive care units. Based on the data from this review, the KCl administration guidelines for our hospital were changed. We now allow a maximum peripheral line concentration of 60 mEq/L, a maximum central line concentration of 120 mEq/L and a maximum KCl infusion rate of 0.4 mEq/kg/hr without the requirement of a heart monitor. Parenteral Nutrition is now restricted to maximum potassium concentration of 80 mEq/L and fluid-restricted patients are restricted to a maximum concentration of 150 mEq/L.
NASA Astrophysics Data System (ADS)
Dunham, G.; Harding, E. C.; Loisel, G. P.; Lake, P. W.; Nielsen-Weber, L. B.
2016-11-01
Fuji TR image plate is frequently used as a replacement detector medium for x-ray imaging and spectroscopy diagnostics at NIF, Omega, and Z facilities. However, the familiar Fuji BAS line of image plate scanners is no longer supported by the industry, and so a replacement scanning system is needed. While the General Electric Typhoon line of scanners could replace the Fuji systems, the shift away from photo stimulated luminescence units to 16-bit grayscale Tag Image File Format (TIFF) leaves a discontinuity when comparing data collected from both systems. For the purposes of quantitative spectroscopy, a known unit of intensity applied to the grayscale values of the TIFF is needed. The DITABIS Super Micron image plate scanning system was tested and shown to potentially rival the resolution and dynamic range of Kodak RAR 2492 x-ray film. However, the absolute sensitivity of the scanner is unknown. In this work, a methodology to cross calibrate Fuji TR image plate and the absolutely calibrated Kodak RAR 2492 x-ray film is presented. Details of the experimental configurations used are included. An energy dependent scale factor to convert Fuji TR IP scanned on a DITABIS Super Micron scanner from 16-bit grayscale TIFF to intensity units (i.e., photons per square micron) is discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunham, G., E-mail: gsdunha@sandia.gov; Harding, E. C.; Loisel, G. P.
Fuji TR image plate is frequently used as a replacement detector medium for x-ray imaging and spectroscopy diagnostics at NIF, Omega, and Z facilities. However, the familiar Fuji BAS line of image plate scanners is no longer supported by the industry, and so a replacement scanning system is needed. While the General Electric Typhoon line of scanners could replace the Fuji systems, the shift away from photo stimulated luminescence units to 16-bit grayscale Tag Image File Format (TIFF) leaves a discontinuity when comparing data collected from both systems. For the purposes of quantitative spectroscopy, a known unit of intensity appliedmore » to the grayscale values of the TIFF is needed. The DITABIS Super Micron image plate scanning system was tested and shown to potentially rival the resolution and dynamic range of Kodak RAR 2492 x-ray film. However, the absolute sensitivity of the scanner is unknown. In this work, a methodology to cross calibrate Fuji TR image plate and the absolutely calibrated Kodak RAR 2492 x-ray film is presented. Details of the experimental configurations used are included. An energy dependent scale factor to convert Fuji TR IP scanned on a DITABIS Super Micron scanner from 16-bit grayscale TIFF to intensity units (i.e., photons per square micron) is discussed.« less
Conceptual design of 100 TW solid state laser system
DOE Office of Scientific and Technical Information (OSTI.GOV)
McMordie, J.A.
1995-12-31
Currently the main solid state laser facilities used for plasma physics research in the United Kingdom are the VULCAN laser at the Rutherford Appleton Laboratory and the HELEN facility at the Atomic Weapons Establishment. In the future it is proposed to replace HELEN with a new 100 TW facility to come on line early in the next century. A brief review is given of the VULCAN and HELEN. Then the authors discuss the design for the HELEN replacement.
A System Approach to Navy Medical Education and Training. Appendix 24. Equipment Repair Technician.
1974-08-31
DENTAL SYRINGE 40 lCORRECT MALFUNCTIONING RETRACTION MECHANISM ON DENTAL UNIT 41 1ADJUST DRIP RATE ON AIR-DRIVEN DENTAL HANDPIECE 42 ICLEAN VALVE... DENTAL UNIT 46 CLEAN/REPLACE WATER FILTER ELEMENTS ON DENTAL UNIT 47 ICLEAR WATER LINES ON CONTRA-ANGLE AIR-DRIVEN DENTAL HANDPIECE 48 IREPLACE WORN...GASKETS ON AIR-DRIVEN DENTAL HANDPIECE 49 IADJUST END PLAY ON DENTAL HANOPIECE so ICLEAN AND REASSEMBLE BELT-DRIVEN DENTAL HANDPIECE TURN
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, P.R.; Van Dyke, J.W; McConnell, B.W.
It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformersmore » may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124 of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on ways to achieve the potential energy savings. Using survey data obtained from utilities and analyses of the economics of refurbishment versus replacement of distribution transformers that are removed from service, it is found that on average utilities are implementing reasonable decisions on refurbishment versus replacement.« less
Optimizing the Navy’s Investment in Space Professionals
2011-09-01
UFO Ultra High Frequency Follow-On UHF Ultra High Frequency URL Unrestricted Line USA United States Army USAF United States Air Force USCYBERCOM...LEASAT), and eight UHF Follow-On ( UFO ) satellites all flying in geostationary orbit (GEO). NAVSOC is the principle Navy command that operates, manages...and maintains the DoD’s narrowband UHF capability from five different ground stations. The replacement satellite for the aging UFO system is the
2009-03-11
CAPE CANAVERAL, Fla. – A closeup of the 7-inch quick disconnect that will be replaced on the hydrogen vent line to the Ground Umbilical Carrier Plate of space shuttle Discovery's external fuel tank. The replacement will be made on Launch Pad 39A at NASA's Kennedy Space Center in Florida. A leak of hydrogen at the site during fueling caused the STS-119 mission to be scrubbed at 2:36 p.m. March 11. The vent line is at the intertank and is the overboard vent to the pad and the flare stack where the vented hydrogen is burned off. Mission management teams believe they have sufficient understanding of the repair plan to continue toward a March 15 launch at 7:43 p.m. EDT. Photo courtesy of United Space Alliance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Utroska, D.
Vandalism on a controversial power line led the owners to turn over a 176-mile portion of the line to the Rural Electrification Administration and make it a Federal facility. This allows the Federal Bureau of Investigation and other Federal agencies to help identify and apprehend the vandals. The 436-mile direct-current T-line connects a mine-mouth coal-fired generating station in North Dakota with central-Minnesota consumers. Protest against the project led to the toppling of 14 towers. Replacement and security costs became too great for the co-owners - the United Power Authority and the Cooperative Power Authority - to bear alone. (DCK)
Cost of Water Distribution System Infrastructure Rehabilitation, Repair, and Replacement.
1985-03-01
terms of the Hazen-Williams C-factor. New pipes have C-factors on the order of 140. Severely tuberculated pipes can have C-factors as low as 40. The C... tuberculation , and significantly higher pressures being required to push a pig through a small opening. Unit costs level off above the 10-in. diam and...additional costs of lining. Lining the pipe will: (a) prevent reoccurrence of tuberculation , (b) seal small leaks, and (c) eliminate "red - water" problems
Let the War on the Poverty Line Commence. Working Paper Series.
ERIC Educational Resources Information Center
Bernstein, Jared
Both social scientists and politicians agree that the way poverty is measured in the United States is inadequate. Noting that this metric influences our understanding of the extent of economic deprivation and influences the provision of social supports, this report presents various options to the current measurement and suggests a replacement for…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
... certificate issued in Docket No. CP82-426, for authorization to replace two existing Ansaldo electric motors with two new electric motors at Transco's existing Compressor Station 205 in Princeton, New Jersey... motors and associated variable frequency drives for units 1 and 2 with two new Siemens electric motors...
Modernization of Koesters interferometer and high accuracy calibration gauge blocks
NASA Astrophysics Data System (ADS)
França, R. S.; Silva, I. L. M.; Couceiro, I. B.; Torres, M. A. C.; Bessa, M. S.; Costa, P. A.; Oliveira, W., Jr.; Grieneisen, H. P. H.
2016-07-01
The Optical Metrology Division (Diopt) of Inmetro is responsible for maintaining the national reference of the length unit according to International System of Units (SI) definitions. The length unit is realized by interferometric techniques and is disseminated to the dimensional community through calibrations of gauge blocks. Calibration of large gauge blocks from 100 mm to 1000 mm has been performed by Diopt with a Koesters interferometer with reference to spectral lines of a krypton discharge lamp. Replacement of this lamp by frequency stabilized lasers, traceable now to the time and frequency scale, is described and the first results are reported.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kosonen, M.; Hakola, M.
2012-07-01
Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to themore » program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)« less
JPRS Report, Science and Technology, Europe.
1991-02-15
VIDP furnace is a further development of the conventional vacuum induction melter (VIM). It has an independent smelting and processing unit, to...which various casting systems can be linked according to the modular principle. Unlike the conventional vacuum induction melter, the VIDP furnace does... induction coil and the crucible. The furnace body can be extracted for relining or replacement with another, ready-lined, fur- nace body. This
40 CFR 141.84 - Lead service line replacement requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Lead service line replacement... PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Control of Lead and Copper § 141.84 Lead service line replacement requirements. (a) Systems that fail to meet the lead action level in tap samples...
40 CFR 141.84 - Lead service line replacement requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Lead service line replacement... PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Control of Lead and Copper § 141.84 Lead service line replacement requirements. (a) Systems that fail to meet the lead action level in tap samples...
40 CFR 141.84 - Lead service line replacement requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Lead service line replacement... PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Control of Lead and Copper § 141.84 Lead service line replacement requirements. (a) Systems that fail to meet the lead action level in tap samples...
Infrared Sensor Readout Design
1975-11-01
Line Replaceable Unit LT Level Translator MRT Minimum Resolvable Temperature MTF Modulation Transfer Function PC Printed Circuit SCCCD Surface...reduced, not only will the aliased noise increase, but signal aliasing will also start to occur. Atlbe display level this means that sharp edges could...converted from a quantity ol charge to a voltage- level shift by the action ol the precharge pulse that presets the potential on the output diode node to
McCarthy, Elisa K; Ogawa, Michelle T; Hopper, Rachel K; Feinstein, Jeffrey A; Gans, Hayley A
2018-01-01
Treatment of pediatric pulmonary hypertension (PH) with IV prostanoids has greatly improved outcomes but requires a central line, posing inherent infection risk. This study examines the types of infections, infection rates, and importantly the effect of line management strategies on reinfection in children receiving IV prostanoids for PH. This study is a retrospective review of all pediatric PH patients receiving intravenous epoprostenol (EPO) or treprostinil (TRE) at one academic tertiary care center between 2000 and 2014. No patients declined participation in the study or were otherwise excluded. Infectious complications were characterized by organism(s), infection rates, time to next infection, and line management decisions (salvage vs. replace). Of the 40 patients followed, 13 sustained 38 infections involving 49 pathogens, with a predominance of gram-positive (GP) organisms (n = 35). The pooled infection rate was 1.06 per 1000 prostanoid days with no difference between EPO and TRE. No significant difference in reinfection rate was observed when comparing line salvage to replacement, regardless of organism type. Both overall and organism-type comparisons suggest longer time between line infections following line salvage compared with line replacement (732 vs. 410 days overall; 793 vs. 363 days for GP; 611 vs. 581 days for gram-negative [GN]; P > 0.05 for all comparisons). Central line replacement following blood stream infections in pediatric PH patients does not improve subsequent infection rates or time to next infection, and may lead to unnecessary risks associated with line replacement, including potential loss of vascular access. A revised approach to central line infections in pediatric PH is proposed.
Hanessian, Stephen; Vinci, Valerio; Auzzas, Luciana; Marzi, Mauro; Giannini, Giuseppe
2006-09-15
Analogues of suberoylanilide hydroxamic acid (SAHA) were prepared by replacing the Zn-binding group with squaric acid, N-hydroxyurea, and 4-hydroxymethyl oxazoline units, also varying the length of the aliphatic chain. No inhibitory activity on HDAC was observed below 1.0 microM and no cytotoxic activity on different tumor cell lines was seen below 20.0 microM.
A diagnostic expert system for aircraft generator control unit (GCU)
NASA Astrophysics Data System (ADS)
Ho, Ting-Long; Bayles, Robert A.; Havlicsek, Bruce L.
The modular VSCF (variable-speed constant-frequency) generator families are described as using standard modules to reduce the maintenance cost and to improve the product's testability. A general diagnostic expert system shell that guides troubleshooting of modules or line replaceable units (LRUs) is introduced. An application of the diagnostic system to a particular LRU, the generator control unit (GCU) is reported. The approach to building the diagnostic expert system is first to capture general diagnostic strategy in an expert system shell. This shell can be easily applied to different devices or LRUs by writing rules to capture only additional device-specific diagnostic information from expert repair personnel. The diagnostic system has the necessary knowledge embedded in its programs and exhibits expertise to troubleshoot the GCU.
CAPABILITY TO RECOVER PLUTONIUM-238 IN H-CANYON/HB-LINE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fuller, Kenneth S. Jr.; Smith, Robert H. Jr.; Goergen, Charles R.
2013-01-09
Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site hadmore » previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np-237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-anyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase-3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ~ 2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase-1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material.« less
NextGen Weather Processor Architecture Study
2010-03-09
achieved in a staged fashion , ideally with new components coming on-line in time to replace existing capabilities prior to their end-of-life dates... fashion , ideally with new components coming on-line in time to replace existing capabilities prior to their end-of-life dates. As part of NWP Segment...weather capabilities. These objectives are to be achieved in a staged fashion , ideally with new components coming on-line in time to replace existing
The silver lining of disposable sporicidal privacy curtains in an intensive care unit.
Kotsanas, Despina; Wijesooriya, W R P L I; Sloane, Tracy; Stuart, Rhonda L; Gillespie, Elizabeth E
2014-04-01
The environment is a well-known source of health care-acquired infection. Because of the known risk of contamination, patient privacy curtains require frequent changes to decrease the risk of spread from patients to curtain and visa versa. Fourteen disposable sporicidal privacy curtains were tested from December 2012 to June 2013 while hanging in a busy intensive care unit. Significant bacterial pathogens were identified and total bacteria enumerated as colony-forming units. Antimicrobial activity of curtain swatches was also tested against a range of bacteria in the laboratory. Measurements were recorded as zone of inhibition and contact inhibition. A cost analysis to replace standard curtains with disposable sporicidal curtains was also undertaken. Cultures grew low numbers of skin and environmental microorganisms with no methicillin-resistant Staphylococcus aureus, carbapenem-resistant Enterobacteriaceae, or Clostridium difficile detected. Vancomycin-resistant enterococci were recovered in very low numbers from 2 curtains where vancomycin-resistant enterococci-infected patients had been located. Privacy curtains demonstrated antimicrobial activity against C difficile and 13 additional bacterial pathogens. We conclude that disposable sporicidal privacy curtains are cost-effective and best replaced at 6 months in a high-risk area such as an intensive care unit. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.
A project of upgrading the operations control system of the Hungarian electric power system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oroszki, L.; Kovacs, G.
About 20 years ago an on-line EMS/SCADA system replaced the previously used off-line control system in the Hungarian power system. The system that has met the technological requirements of that time now became obsolete. A project started in 1995 by the Hungarian Power Companies, Ltd. (MVM Rt.), the regional utility companies and the power plant companies, with funding through a World Bank loan to cover international procurement, aims to upgrade that system into a complex, intelligent and state-of-the-art process control system. The new hierarchical system will rely on a distributed computer network structure, universally accepted hardware/software interface standards and communicationmore » protocols and use hardware platform independent software. The automatic generation control, performed from the National Dispatch Centre, will have expanded functionality, the most important single item of this will be the inclusion of automatic voltage/var control. The upgrading project includes the replacement of the substation and power plant remote terminal units and the installation of a telecommunication network to provide this telecontrol system with the necessary communications links. The supply contracts for both the master station and the remote terminal unit parts were awarded to the winners of open international bidding processes. In the project implementation MVM has the overall responsibility and works with assistance from international and Hungarian engineering firms.« less
NASA Astrophysics Data System (ADS)
Moser, Eric K.
2016-05-01
LITENING is an airborne system-of-systems providing long-range imaging, targeting, situational awareness, target tracking, weapon guidance, and damage assessment, incorporating a laser designator and laser range finders, as well as non-thermal and thermal imaging systems, with multi-sensor boresight. Robust operation is at a premium, and subsystems are partitioned to modular, swappable line-replaceable-units (LRUs) and shop-replaceable-units (SRUs). This presentation will explore design concepts for sensing, data storage, and presentation of imagery associated with the LITENING targeting pod. The "eyes" of LITENING are the electro-optic sensors. Since the initial LITENING II introduction to the US market in the late 90s, as the program has evolved and matured, a series of spiral functional improvements and sensor upgrades have been incorporated. These include laser-illuminated imaging, and more recently, color sensing. While aircraft displays are outside of the LITENING system, updates to the available viewing modules have also driven change, and resulted in increasingly effective ways of utilizing the targeting system. One of the latest LITENING spiral upgrades adds a new capability to display and capture visible-band color imagery, using new sensors. This is an augmentation to the system's existing capabilities, which operate over a growing set of visible and invisible colors, infrared bands, and laser line wavelengths. A COTS visible-band camera solution using a CMOS sensor has been adapted to meet the particular needs associated with the airborne targeting use case.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-27
... Proposed Brandywine Creek Replacement Project; Request for Comments on Environmental Issues; and Notice of... Transcontinental Gas Pipe Line Company, LLC's (Transco) proposed Brandywine Creek Replacement Project (Project... participation section of this notice. FERC Public Scoping Meeting, Brandywine Creek Replacement Project, October...
... before starting any new medication. First-Line Medications: Nicotine Replacement Therapy (NRT) These medications are called "first- ... they might try a "second-line" medication instead. Nicotine replacement therapy (NRT) helps smokers quit by reducing ...
NASA Technical Reports Server (NTRS)
Cavanagh, D.; Traub, B.
1981-01-01
Line oriented training is used in a broader, more generic sense that as a specific program under FAR 12.1409 and AC 120-35. A company policy was adopted more than twenty years ago requiring that all pilot checks and recurrent training be conducted with a full crew occupying the seats they occupy on the line. Permission was obtained to reschedule the hours for recurrent proficiency training to include one and one-half hours of LOFT flight. The number of emergencies and abnormal procedures which could be undertaken were considered and the introduction of an a occasional incapacitation revealed which person is the most difficult to replace on the widebodies. By using the LOFT concept, every training period can be structured like a typical line flight. The use of LOFT in simulator syllabus development and problems that need to be refined are discussed.
NASA Technical Reports Server (NTRS)
Tomaro, D. J.
1982-01-01
During extravehicular activity (EVA), communications between the EVA astronaut and the space shuttle orbiter are maintained by means of transceiver installed in the environmental support system backpack. Onboard the orbiter, a transceiver line replaceable unit and its associated equipment performs the task of providing a communications link to the astronaut in the extravehicular activity/air traffic control (EVA/ATC) mode. Results of the acceptance tests that performed on the system designed and fabricated for EVA/ATC testing are discussed.
Technicians test OV-102's aft fuselage LRU hydrogen recirculation pump
NASA Technical Reports Server (NTRS)
1990-01-01
Donald C. Buckner, a Lockheed mechanical lead technician, installs an aft fuselage line replaceable unit (LRU) liquid hydrogen recirculation pump from Columbia, Orbiter Vehicle (OV) 102 into JSC's Thermochemical Test Area (TTA) Support Laboratory Bldg 350 test stand. Technicians ran the pump package through the battery of leak tests. Preliminary indications showed only minor, acceptable leakage from the package and Kennedy Space Center (KSC) technicians have replaced a crushed seal on the prevalve of the main propulsion system they believe may have caused the STS-35 hydrogen leak. In addition to Buckner, (left to right) Larry Kilbourn, a Rockwell Service Center lead mechanical technician from Cape Canaveral, and John Dickerson, a quality inspector with EBASCO Services, also monitored the test at JSC. Photo taken by JSC photographer Benny Benavides.
A replacement LH2 recirculation line before installation in Discovery
NASA Technical Reports Server (NTRS)
1999-01-01
A spare four-inch diameter LH2 recirculation line (shown in photo) will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about =-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.
Science Advisory Board Evaluation of the Effectiveness of Partial Lead Service Line Replacements
Report of the Science Advisory Board (SAB) to evaluate the current scientific data to determine the effectiveness of partial lead service line replacements (PLSLR) in reducing drinking water lead levels.
Capability to Recover Plutonium-238 in H-Canyon/HB-Line - 13248
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fuller, Kenneth S. Jr.; Smith, Robert H. Jr.; Goergen, Charles R.
2013-07-01
Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site hadmore » previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np- 237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-Canyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase- 3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ∼2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase- 1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material. (authors)« less
NASA Technical Reports Server (NTRS)
Padilla, Peter A.
1991-01-01
An investigation was made in AIRLAB of the fault handling performance of the Fault Tolerant MultiProcessor (FTMP). Fault handling errors detected during fault injection experiments were characterized. In these fault injection experiments, the FTMP disabled a working unit instead of the faulted unit once in every 500 faults, on the average. System design weaknesses allow active faults to exercise a part of the fault management software that handles Byzantine or lying faults. Byzantine faults behave such that the faulted unit points to a working unit as the source of errors. The design's problems involve: (1) the design and interface between the simplex error detection hardware and the error processing software, (2) the functional capabilities of the FTMP system bus, and (3) the communication requirements of a multiprocessor architecture. These weak areas in the FTMP's design increase the probability that, for any hardware fault, a good line replacement unit (LRU) is mistakenly disabled by the fault management software.
Development of Live-working Robot for Power Transmission Lines
NASA Astrophysics Data System (ADS)
Yan, Yu; Liu, Xiaqing; Ren, Chengxian; Li, Jinliang; Li, Hui
2017-07-01
Dream-I, the first reconfigurable live-working robot for power transmission lines successfully developed in China, has the functions of autonomous walking on lines and accurately positioning. This paper firstly described operation task and object of the robot; then designed a general platform, an insulator replacement end and a drainage plate bolt fastening end of the robot, presented a control system of the robot, and performed simulation analysis on operation plan of the robot; and finally completed electrical field withstand voltage tests in a high voltage hall as well as online test and trial on actual lines. Experimental results show that by replacing ends of manipulators, the robot can fulfill operation tasks of live replacement of suspension insulators and live drainage plate bolt fastening.
NASA Technical Reports Server (NTRS)
Rosener, A. A.; Jonkoniec, T. G.
1975-01-01
A positive isolation disconnect was developed for component replacement in serviced liquid and gaseous spacecraft systems. Initially a survey of feasible concepts was made to determine the optimum method for fluid isolation, sealing techniques, coupling concepts, and foolproofing techniques. The top concepts were then further evaluated, including the fabrication of a semifunctional model. After all tradeoff analyses were made, a final configuration was designed and fabricated for development testing. This resulted in a 6.35 mm (1/4 inch) line and 12.7 mm (1/2 inch) line positive isolation disconnect, each unit consisting of two coupled disconnect halves, each capable of fluid isolation with essentially zero clearance between them for zero leakage upon disconnect half disengagement. An interlocking foolproofing technique was incorporated that prevents uncoupling of disconnect halves prior to fluid isolation.
40 CFR 74.47 - Transfer of allowances from the replacement of thermal energy-combustion sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
... replacement of thermal energy-combustion sources. 74.47 Section 74.47 Protection of Environment ENVIRONMENTAL...—combustion sources. (a) Thermal energy plan—(1) General provisions. The designated representative of an opt... quarter the replacement unit(s) will replace thermal energy of the opt-in source; (ii) The name...
40 CFR 141.84 - Lead service line replacement requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Lead service line replacement requirements. 141.84 Section 141.84 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Control of Lead and Copper § 141.84 Lead...
40 CFR 141.84 - Lead service line replacement requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Lead service line replacement requirements. 141.84 Section 141.84 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Control of Lead and Copper § 141.84 Lead...
Fault recovery characteristics of the fault tolerant multi-processor
NASA Technical Reports Server (NTRS)
Padilla, Peter A.
1990-01-01
The fault handling performance of the fault tolerant multiprocessor (FTMP) was investigated. Fault handling errors detected during fault injection experiments were characterized. In these fault injection experiments, the FTMP disabled a working unit instead of the faulted unit once every 500 faults, on the average. System design weaknesses allow active faults to exercise a part of the fault management software that handles byzantine or lying faults. It is pointed out that these weak areas in the FTMP's design increase the probability that, for any hardware fault, a good LRU (line replaceable unit) is mistakenly disabled by the fault management software. It is concluded that fault injection can help detect and analyze the behavior of a system in the ultra-reliable regime. Although fault injection testing cannot be exhaustive, it has been demonstrated that it provides a unique capability to unmask problems and to characterize the behavior of a fault-tolerant system.
Long-Term Behavior of Simulated Partial Lead Service Line Replacements
St. Clair, Justin; Cartier, Clement; Triantafyllidou, Simoni; Clark, Brandi; Edwards, Marc
2016-01-01
Abstract In this 48-month pilot study, long-term impacts of copper:lead galvanic connections on lead release to water were assessed without confounding differences in pipe exposure prehistory or disturbances arising from cutting lead pipe. Lead release was tracked from three lead service line configurations, including (1) 100% lead, (2) traditional partial replacement with 50% copper upstream of 50% lead, and (3) 50% lead upstream of 50% copper as a function of flow rate, connection types, and sampling methodologies. Elevated lead from galvanic corrosion worsened with time, with 140% more lead release from configurations representing traditional partial replacement configurations at 14 months compared to earlier data in the first 8 months. Even when sampled consistently at moderate flow rate (8 LPM) and collecting all water passing through service lines, conditions representing traditional partial service line configurations were significantly worse (≈40%) when compared to 100% lead pipe. If sampled at a high flow rate (32 LPM) and collecting 2 L samples from service lines, 100% of samples collected from traditional partial replacement configurations exceeded thresholds posing an acute health risk versus a 0% risk for samples from 100% lead pipe. Temporary removal of lead accumulations near Pb:Cu junctions and lead deposits from other downstream plastic pipes reduced risk of partial replacements relative to that observed for 100% lead. When typical brass compression couplings were used to connect prepassivated lead pipes, lead release spiked up to 10 times higher, confirming prior concerns raised at bench and field scale regarding adverse impacts of crevices and service line disturbances on lead release. To quantify semirandom particulate lead release from service lines in future research, whole-house filters have many advantages compared to other approaches. PMID:26989344
NASA Astrophysics Data System (ADS)
Silber, Armin; Gonzalez, Christian; Pino, Francisco; Escarate, Patricio; Gairing, Stefan
2014-08-01
With expanding sizes and increasing complexity of large astronomical observatories on remote observing sites, the call for an efficient and recourses saving maintenance concept becomes louder. The increasing number of subsystems on telescopes and instruments forces large observatories, like in industries, to rethink conventional maintenance strategies for reaching this demanding goal. The implementation of full-, or semi-automatic processes for standard service activities can help to keep the number of operating staff on an efficient level and to reduce significantly the consumption of valuable consumables or equipment. In this contribution we will demonstrate on the example of the 80 Cryogenic subsystems of the ALMA Front End instrument, how an implemented automatic service process increases the availability of spare parts and Line Replaceable Units. Furthermore how valuable staff recourses can be freed from continuous repetitive maintenance activities, to allow focusing more on system diagnostic tasks, troubleshooting and the interchanging of line replaceable units. The required service activities are decoupled from the day-to-day work, eliminating dependencies on workload peaks or logistic constrains. The automatic refurbishing processes running in parallel to the operational tasks with constant quality and without compromising the performance of the serviced system components. Consequentially that results in an efficiency increase, less down time and keeps the observing schedule on track. Automatic service processes in combination with proactive maintenance concepts are providing the necessary flexibility for the complex operational work structures of large observatories. The gained planning flexibility is allowing an optimization of operational procedures and sequences by considering the required cost efficiency.
2011-05-04
CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A, the Load Control Assembly-2 (LCA-2) has been replaced inside of space shuttle Endeavour. Located in Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission and has been replaced. Systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Troy Cryder
2011-05-04
CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A, the Load Control Assembly-2 (LCA-2) has been replaced inside of space shuttle Endeavour. Located in Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission and has been replaced. Systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Troy Cryder
2011-05-04
CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A, the Load Control Assembly-2 (LCA-2) has been replaced inside of space shuttle Endeavour. Located in Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission and has been replaced. Systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Troy Cryder
2011-05-04
CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A, space shuttle Endeavour sits poised for launch after technicians replaced the Load Control Assembly-2 (LCA-2) in its aft section. Located in Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission and has been replaced. Systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Troy Cryder
2011-05-04
CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A, space shuttle Endeavour sits poised for launch after technicians replaced the Load Control Assembly-2 (LCA-2) in its aft section. Located in Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission and has been replaced. Systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Troy Cryder
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead groundmore » wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.« less
2012-05-01
indoor air quality from installation of a new, improved cleaning line ventilation system. Cultural Resources No adverse effect on cultural...EA) has been prepared to assess the potential effects on the human and natural environment of replacing the chemical cleaning line at Tinker Air...providing improved system monitors and controls, reducing the overall energy consumption of the system, and enabling the system to accommodate larger
The Loma Prieta, California, Earthquake of October 17, 1989: Performance of the Built Environment
Coordinated by Holzer, Thomas L.
1998-01-01
Professional Paper 1552 focuses on the response of buildings, lifelines, highway systems, and earth structures to the earthquake. Losses to these systems totaled approximated $5.9 billion. The earthquake displaced many residents from their homes and severely disrupted transportation systems. Some significant findings were: * Approximately 16,000 housing units were uninhabitable after the earthquake including 13,000 in the San Francisco Bay region. Another 30,000-35,000 units were moderately damaged in the earthquake. Renters and low-income residents were particularly hard hit. * Failure of highway systems was the single largest cause of loss of life during the earthquake. Forty-two of the 63 earthquake fatalities died when the Cypress Viaduct in Oakland collapsed. The cost to repair and replace highways damaged by the earthquake was $2 billion, about half of which was to replace the Cypress Viaduct. * Major bridge failures were the result of antiquated designs and inadequate anticipation of seismic loading. * Twenty one kilometers (13 mi) of gas-distribution lines had to be replaced in several communities and more than 1,200 leaks and breaks in water mains and service connections had to be excavated and repaired. At least 5 electrical substations were badly damaged, overwhelming the designed redundancy of the electrical system. * Instruments in 28 buildings recorded their response to earthquake shaking that provided opportunities to understand how different types of buildings responded, the importance of site amplification, and how buildings interact with their foundation when shaken (soil structure interaction).
1988-03-18
Design Confiquration 6 ......... 805 Appendix 9 SCRAPIRONS’s Output For Design Confiquration 7 ......... 90 Appendix 10 SCRAPIRONS’s Output For fesign ...17umb~r of men per contact support crew 2.00e0j _______ TVRO IV test equipment). 293 Name-285) TRC D~own-time in hours per service demanda4 equipment...to service for servicing further _____LUs. 297 14iaeeC28F) T~mE used in concepts GM. GO. and CR which 84.rje1 cal;.for LRU and: mtue ear atGeneral S
Reusable Rocket Engine Turbopump Health Management System
NASA Technical Reports Server (NTRS)
Surko, Pamela
1994-01-01
A health monitoring expert system software architecture has been developed to support condition-based health monitoring of rocket engines. Its first application is in the diagnosis decisions relating to the health of the high pressure oxidizer turbopump (HPOTP) of Space Shuttle Main Engine (SSME). The post test diagnostic system runs off-line, using as input the data recorded from hundreds of sensors, each running typically at rates of 25, 50, or .1 Hz. The system is invoked after a test has been completed, and produces an analysis and an organized graphical presentation of the data with important effects highlighted. The overall expert system architecture has been developed and documented so that expert modules analyzing other line replaceable units may easily be added. The architecture emphasizes modularity, reusability, and open system interfaces so that it may be used to analyze other engines as well.
Production of maternal-zygotic mutant zebrafish by germ-line replacement.
Ciruna, Brian; Weidinger, Gilbert; Knaut, Holger; Thisse, Bernard; Thisse, Christine; Raz, Erez; Schier, Alexander F
2002-11-12
We report a generally applicable strategy for transferring zygotic lethal mutations through the zebrafish germ line. By using a morpholino oligonucleotide that blocks primordial germ cell (PGC) development, we generate embryos devoid of endogenous PGCs to serve as hosts for the transplantation of germ cells derived from homozygous mutant donors. Successful transfers are identified by the localization of specifically labeled donor PGCs to the region of the developing gonad in chimeric embryos. This strategy, which results in the complete replacement of the host germ line with donor PGCs, was validated by the generation of maternal and maternal-zygotic mutants for the miles apart locus. This germ-line replacement technique provides a powerful tool for studying the maternal effects of zygotic lethal mutations. Furthermore, the ability to generate large clutches of purely mutant embryos will greatly facilitate embryological, genetic, genomic, and biochemical studies.
Production of maternal-zygotic mutant zebrafish by germ-line replacement
Ciruna, Brian; Weidinger, Gilbert; Knaut, Holger; Thisse, Bernard; Thisse, Christine; Raz, Erez; Schier, Alexander F.
2002-01-01
We report a generally applicable strategy for transferring zygotic lethal mutations through the zebrafish germ line. By using a morpholino oligonucleotide that blocks primordial germ cell (PGC) development, we generate embryos devoid of endogenous PGCs to serve as hosts for the transplantation of germ cells derived from homozygous mutant donors. Successful transfers are identified by the localization of specifically labeled donor PGCs to the region of the developing gonad in chimeric embryos. This strategy, which results in the complete replacement of the host germ line with donor PGCs, was validated by the generation of maternal and maternal-zygotic mutants for the miles apart locus. This germ-line replacement technique provides a powerful tool for studying the maternal effects of zygotic lethal mutations. Furthermore, the ability to generate large clutches of purely mutant embryos will greatly facilitate embryological, genetic, genomic, and biochemical studies. PMID:12397179
76 FR 76044 - Safety Zone; Power Line Replacement, West Bay, Panama City, FL
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2011-0983] RIN 1625-AA00 Safety Zone; Power Line Replacement, West Bay, Panama City, FL AGENCY: Coast Guard, DHS. ACTION..., West Bay, Panama City, FL (a) Location. The following area is a safety zone: A portion of West Bay...
MELFI-3 Electronic Unit Replacement
2011-07-01
ISS028-E-013799 (1 July 2011) --- NASA astronaut Mike Fossum, Expedition 28 flight engineer, replaces a failed electronic unit for the Minus Eighty Laboratory Freezer for ISS 3 (MELFI-3) with a spare unit in the Kibo laboratory of the International Space Station.
MELFI-3 Electronic Unit Replacement
2011-07-01
ISS028-E-013797 (1 July 2011) --- NASA astronaut Mike Fossum, Expedition 28 flight engineer, replaces a failed electronic unit for the Minus Eighty Laboratory Freezer for ISS 3 (MELFI-3) with a spare unit in the Kibo laboratory of the International Space Station.
Rohlmann, Antonius; Gabel, Udo; Graichen, Friedmar; Bender, Alwina; Bergmann, Georg
2007-06-01
Realistic loads on a spinal implant are required among others for optimization of implant design and preclinical testing. In addition, such data may help to choose the optimal physiotherapy program for patients with such an implant and to evaluate the efficacy of aids like braces or crutches. Presently, no implant is available that can measure loads in the anterior spinal column during activities of daily life. Therefore, an implant instrumented for in vivo load measurement was developed for vertebral body replacement. The aim of this paper is to describe in detail a telemeterized implant that measures forces and moments acting on it. Six load sensors, a nine-channel telemetry unit and a coil for inductive power supply of the electronic circuits were integrated into a modified vertebral body replacement (Synex). The instrumented part of the implant is hermetically sealed. Patients are videotaped during measurements, and implant loads are displayed on and off line. The average accuracy of load measurement is better than 2% for force and 5% for moment components with reference to the maximum value of 3000 N and 20 Nm, respectively. The measuring implant described here will provide additional information on spinal loads.
Deshommes, Elise; Laroche, Laurent; Deveau, Dominique; Nour, Shokoufeh; Prévost, Michèle
2017-09-05
Thirty-three households were monitored in a full-scale water distribution system, to investigate the impact of recent (<2 yr) or old partial lead service line replacements (PLSLRs). Total and particulate lead concentrations were measured using repeat sampling over a period of 1-20 months. Point-of-entry filters were installed to capture sporadic release of particulate lead from the lead service lines (LSLs). Mean concentrations increased immediately after PLSLRs and erratic particulate lead spikes were observed over the 18 month post-PLSLR monitoring period. The mass of lead released during this time frame indicates the occurrence of galvanic corrosion and scale destabilization. System-wide, lead concentrations were however lower in households with PLSLRs as compared to those with no replacement, especially for old PLSLRs. Nonetheless, 61% of PLSLR samples still exceeded 10 μg/L, reflecting the importance of implementing full LSL replacement and efficient risk communication. Acute concentrations measured immediately after PLSLRs demonstrate the need for appropriate flushing procedures to prevent lead poisoning.
ERIC Educational Resources Information Center
Malone, Jo Ann
2017-01-01
Access to the Internet and technology skills are essential to the success of college students. Electronic textbooks are replacing paper textbooks. Laptops are replacing pens, pencils, and paper. Electronic forms found on school websites are replacing long registration lines. Hyperlinks are replacing handouts, and face-to-face interaction with…
Total ankle replacement systems available in the United States.
Coetzee, J Chris; Deorio, James K
2010-01-01
Ankle replacement continues to be a viable option for treating patients with ankle arthritis. Over the past 10 years, there has been a significant increase in the number of ankle replacement systems available for use. Current controversy centers on whether fixed- or mobile-bearing devices are most advantageous. Most total ankle systems used outside the United States are mobile-bearing devices, whereas ankle replacement systems used in the United States are all essentially fixed-bearing devices. Not all ankles with degenerative changes are amenable to replacement surgery, and several exclusion criteria are well documented. Ankle replacement is especially complicated because of the ankle's proximity to the foot and the important role that the balance and alignment of the foot play in the success of the ankle replacement. Foot deformities should be treated before or at the time of ankle replacement surgery. Ignoring foot deformities can lead to failure of the ankle replacement. It is also of paramount importance to consider the stability of the ankle ligaments. An unstable ankle with a varus or valgus deformity of more than 20 degrees is probably not amenable to ankle replacement. There are currently no reliable options to predictably reconstruct the lateral or medial ligaments in these severe deformities. It is important to be aware of the ankle replacement systems currently available in the United States and understand the key features of each design. Devices approved by the US Food and Drug Administration, a device that is awaiting approval, and a device that is being evaluated by the Food and Drug Administration in a prospective randomized clinical trial are discussed, along with an objective comparison of fixed- and mobile-bearing devices.
77 FR 41814 - Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-16
... Unit 1 result primarily from periodic testing of diesel generators and fire water pump diesel engines... rural. GGNS Unit 1 is a General Electric Mark 3 boiling-water reactor. Identification of the Proposed... following: replacing the reactor feed pump turbine rotors; replacing the main generator current transformers...
New Generation General Purpose Computer (GPC) compact IBM unit
NASA Technical Reports Server (NTRS)
1991-01-01
New Generation General Purpose Computer (GPC) compact IBM unit replaces a two-unit earlier generation computer. The new IBM unit is documented in table top views alone (S91-26867, S91-26868), with the onboard equipment it supports including the flight deck CRT screen and keypad (S91-26866), and next to the two earlier versions it replaces (S91-26869).
Astronaut tool development: An orbital replaceable unit-portable handhold
NASA Technical Reports Server (NTRS)
Redmon, John W., Jr.
1989-01-01
A tool to be used during astronaut Extra-Vehicular Activity (EVA) replacement of spent or defective electrical/electronic component boxes is described. The generation of requirements and design philosophies are detailed, as well as specifics relating to mechanical development, interface verifications, testing, and astronaut feedback. Findings are presented in the form of: (1) a design which is universally applicable to spacecraft component replacement, and (2) guidelines that the designer of orbital replacement units might incorporate to enhance spacecraft on-orbit maintainability and EVA mission safety.
NASA Technical Reports Server (NTRS)
Mitchell, T. R.
1974-01-01
The development of a test engineer oriented language has been under way at the Kennedy Space Center for several years. The result of this effort is the Ground Operations Aerospace Language, GOAL, a self-documenting, high-order language suitable for coding automatic test, checkout and launch procedures. GOAL is a highly readable, writable, retainable language that is easily learned by nonprogramming oriented engineers. It is sufficiently powerful for use at all levels of Space Shuttle ground processing, from line replaceable unit checkout to integrated launch day operations. This paper will relate the language development, and describe GOAL and its applications.
Embedded piezoelectrics for sensing and energy harvesting in total knee replacement units
NASA Astrophysics Data System (ADS)
Wilson, Brooke E.; Meneghini, Michael; Anton, Steven R.
2015-04-01
The knee replacement is the second most common orthopedic surgical intervention in the United States, but currently only 1 in 5 knee replacement patients are satisfied with their level of pain reduction one year after surgery. It is imperative to make the process of knee replacement surgery more objective by developing a data driven approach to ligamentous balance, which increases implant life. In this work, piezoelectric materials are considered for both sensing and energy harvesting applications in total knee replacement implants. This work aims to embed piezoelectric material in the polyethylene bearing of a knee replacement unit to act as self-powered sensors that will aid in the alignment and balance of the knee replacement by providing intraoperative feedback to the surgeon. Postoperatively, the piezoelectric sensors can monitor the structural health of the implant in order to perceive potential problems before they become bothersome to the patient. Specifically, this work will present on the use of finite element modeling coupled with uniaxial compression testing to prove that piezoelectric stacks can be utilized to harvest sufficient energy to power sensors needed for this application.
76 FR 16845 - Administrator's Line of Succession Designation, No. 1-A, Revision 32
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... SMALL BUSINESS ADMINISTRATION Administrator's Line of Succession Designation, No. 1-A, Revision 32 This document replaces and supersedes ``Line of Succession Designation No. 1-A, Revision 31.'' Line of Succession Designation No. 1-A, Revision 32 Effective immediately, the Administrator's Line of Succession...
77 FR 44305 - Administrator's Line of Succession Designation, No. 1-A, Revision 34
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... SMALL BUSINESS ADMINISTRATION Administrator's Line of Succession Designation, No. 1-A, Revision 34 This document replaces and supersedes ``Line of Succession Designation No. 1-A, Revision 33.'' Line of Succession Designation No. 1-A, Revision 34: Effective immediately, the Administrator's Line of Succession...
1999-12-09
A spare four-inch diameter LH2 recirculation line (shown in photo) will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about ½-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope
Daniels, Alan H; Paller, David J; Koruprolu, Sarath; Palumbo, Mark A; Crisco, Joseph J
2013-01-01
Biomechanical investigations of spinal motion preserving implants help in the understanding of their in vivo behavior. In this study, we hypothesized that the lumbar spine with implanted total spinal segment replacement (TSSR) would exhibit decreased dynamic stiffness and more rapid energy absorption compared to native functional spinal units under simulated physiologic motion when tested with the pendulum system. Five unembalmed, frozen human lumbar functional spinal units were tested on the pendulum system with axial compressive loads of 181 N, 282 N, 385 N, and 488 N before and after Flexuspine total spinal segment replacement implantation. Testing in flexion, extension, and lateral bending began by rotating the pendulum to 5°; resulting in unconstrained oscillatory motion. The number of rotations to equilibrium was recorded and bending stiffness (N-m/°) was calculated and compared for each testing mode. The total spinal segment replacement reached equilibrium with significantly fewer cycles to equilibrium compared to the intact functional spinal unit at all loads in flexion (p<0.011), and at loads of 385 N and 488 N in lateral bending (p<0.020). Mean bending stiffness in flexion, extension, and lateral bending increased with increasing load for both the intact functional spinal unit and total spinal segment replacement constructs (p<0.001), with no significant differences in stiffness between the intact functional spinal unit and total spinal segment replacement in any of the test modes (p>0.18). Lumbar functional spinal units with implanted total spinal segment replacement were found to have similar dynamic bending stiffness, but absorbed energy at a more rapid rate than intact functional spinal units during cyclic loading with an unconstrained pendulum system. Although the effects on clinical performance of motion preserving devices is not fully known, these results provide further insight into the biomechanical behavior of this device under approximated physiologic loading conditions.
Daniels, Alan H.; Paller, David J.; Koruprolu, Sarath; Palumbo, Mark A.; Crisco, Joseph J.
2013-01-01
Background Biomechanical investigations of spinal motion preserving implants help in the understanding of their in vivo behavior. In this study, we hypothesized that the lumbar spine with implanted total spinal segment replacement (TSSR) would exhibit decreased dynamic stiffness and more rapid energy absorption compared to native functional spinal units under simulated physiologic motion when tested with the pendulum system. Methods Five unembalmed, frozen human lumbar functional spinal units were tested on the pendulum system with axial compressive loads of 181 N, 282 N, 385 N, and 488 N before and after Flexuspine total spinal segment replacement implantation. Testing in flexion, extension, and lateral bending began by rotating the pendulum to 5°; resulting in unconstrained oscillatory motion. The number of rotations to equilibrium was recorded and bending stiffness (N-m/°) was calculated and compared for each testing mode. Results The total spinal segment replacement reached equilibrium with significantly fewer cycles to equilibrium compared to the intact functional spinal unit at all loads in flexion (p<0.011), and at loads of 385 N and 488 N in lateral bending (p<0.020). Mean bending stiffness in flexion, extension, and lateral bending increased with increasing load for both the intact functional spinal unit and total spinal segment replacement constructs (p<0.001), with no significant differences in stiffness between the intact functional spinal unit and total spinal segment replacement in any of the test modes (p>0.18). Conclusions Lumbar functional spinal units with implanted total spinal segment replacement were found to have similar dynamic bending stiffness, but absorbed energy at a more rapid rate than intact functional spinal units during cyclic loading with an unconstrained pendulum system. Although the effects on clinical performance of motion preserving devices is not fully known, these results provide further insight into the biomechanical behavior of this device under approximated physiologic loading conditions. PMID:23451222
Kurtz, Steven M; Ong, Kevin L; Lau, Edmund; Bozic, Kevin J
2014-04-16
Few studies have explored the role of the National Health Expenditure and macroeconomics on the utilization of total joint replacement. The economic downturn has raised questions about the sustainability of growth for total joint replacement in the future. Previous projections of total joint replacement demand in the United States were based on data up to 2003 using a statistical methodology that neglected macroeconomic factors, such as the National Health Expenditure. Data from the Nationwide Inpatient Sample (1993 to 2010) were used with United States Census and National Health Expenditure data to quantify historical trends in total joint replacement rates, including the two economic downturns in the 2000s. Primary and revision hip and knee arthroplasty were identified using codes from the International Classification of Diseases, Ninth Revision, Clinical Modification. Projections in total joint replacement were estimated using a regression model incorporating the growth in population and rate of arthroplasties from 1993 to 2010 as a function of age, sex, race, and census region using the National Health Expenditure as the independent variable. The regression model was used in conjunction with government projections of National Health Expenditure from 2011 to 2021 to estimate future arthroplasty rates in subpopulations of the United States and to derive national estimates. The growth trend for the incidence of joint arthroplasty, for the overall United States population as well as for the United States workforce, was insensitive to economic downturns. From 2009 to 2010, the total number of procedures increased by 6.0% for primary total hip arthroplasty, 6.1% for primary total knee arthroplasty, 10.8% for revision total hip arthroplasty, and 13.5% for revision total knee arthroplasty. The National Health Expenditure model projections for primary hip replacement in 2020 were higher than a previously projected model, whereas the current model estimates for total knee arthroplasty were lower. Economic downturns in the 2000s did not substantially influence the national growth trends for hip and knee arthroplasty in the United States. These latest updated projections provide a basis for surgeons, hospitals, payers, and policy makers to plan for the future demand for total joint replacement surgery.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This paper reports on damaged sections of Botas' dual 30-in. gas line carrying USSR gas across the Marmara Sea to Turkey that were replaced 30 days ahead of contract schedule. Tefken Construction and Installation Co., Inc., Istanbul, working under a $4-million contract, replaced two sections on one of the dual lines near Ambarli, Turkey, within a two-month period. The offshore system stretches 33-mi under the Marmara Sea with some pipe laid at 262-ft maximum water depths. The scope of the project was to replace a 426-ft offshore approach to the northern shoreline and a 984-ft onshore section, which were damagedmore » by a submarine landslide.« less
Crystallization and halide phasing of the C-terminal domain of human KIN17
le Maire, Albane; Schiltz, Marc; Braud, Sandrine; Gondry, Muriel; Charbonnier, Jean-Baptiste; Zinn-Justin, Sophie; Stura, Enrico
2006-01-01
Here, the crystallization and initial phasing of the C-terminal domain of human KIN17, a 45 kDa protein mainly expressed in response to ionizing radiation and overexpressed in certain tumour cell lines, are reported. Crystals diffracting to 1.4 Å resolution were obtained from 10% ethylene glycol, 27% PEG 6000, 500 mM LiCl and 100 mM sodium acetate pH 6.3 in space group P212121, with unit-cell parameters a = 45.75, b = 46.31, c = 60.80 Å and one molecule in the asymmetric unit. Since this domain has a basic pI, heavy-atom derivatives were obtained by soaking the crystals with negatively charged ions such as tungstate and iodine. The replacement of LiCl by KI in the cryosolution allowed the determination of phases from iodide ions to give an interpretable electron-density map. PMID:16511313
United States Air Force Wipe Solvent Testing
NASA Technical Reports Server (NTRS)
Hornung, Steven D.; Beeson, Harold D.
2000-01-01
The Wright-Patterson Air Force Base (WPAFB), as part of the Air Force Material Command, requested that NASA Johnson Space Center (JSC) White Sands Test Facility (WSTF) conduct testing and analyses in support of the United States Air Force Wipe Solvent Development Project. The purpose of the wipe solvent project is to develop an alternative to be used by Air Force flight line and maintenance personnel for the wipe cleaning of oxygen equipment. This report provides material compatibility, liquid oxygen (LOX) mechanical impact, autogenous ignition temperature (AIT), and gauge cleaning test data for some of the currently available solvents that may be used to replace CFC-113 and methyl chloroform. It provides data from previous WSTF test programs sponsored by the Naval Sea Systems Command, the Kennedy Space Center, and other NASA programs for the purpose of assisting WP AFB in identifying the best alternative solvents for validation testing.
Double standards and the international trade of pesticides: the Brazilian case.
Porto, Marcelo Firpo; Milanez, Bruno; Soares, Wagner Lopes; Meyer, Armando
2010-01-01
Despite bans on certain pesticides and their replacement by others considered less hazardous, the widespread use of these substances in agriculture continues to threaten the environment and the health of millions of people. This article discusses the current double standard in the international trade of pesticides and focuses on Brazil, one of the main users of pesticides in the world, analyzing the trends in foreign trade (imports and exports) of selected pesticides as a function of changes in legislation in the United States, the European Union, and Brazil from 1989 to 2006. We applied time line analysis to eight organochlorines already banned in Brazil and conducted a case-by-case qualitative and quantitative analysis of nine other pesticides. The results indicate the existence of double standards, as demonstrated by the continued exports to Brazil of some pesticides banned in the United States and Europe.
Kawahara, Yukari
2015-12-01
This paper aims to show the system for relief provided by the Japanese Red Cross relief units during the Second World War, as well as the actual activities of sixteen of its relief units dispatched to Burma. The Red Cross wartime relief efforts involved using personnel and funding prepared beforehand to provide aid to those injured in war, regardless of their status as ally or enemy. Thus they were able to receive support from the army in order to ensure safety and provide supplies. Nurses dispatched to Burma took care of many patients who suffered from malnutrition and physical injuries amidst the outbreak of infectious diseases typical of tropical areas, without sufficient replacement members. Base hospitals not meant for the front lines also came under attack, and the nurses' lives were thus in mortal danger. Of the 374 original members, 29 died or went missing in action.
VIEW OF THE #67 HOLDING FURNACE POURING AT #04 COPPER ...
VIEW OF THE #67 HOLDING FURNACE POURING AT #04 COPPER STATION IN THE CASTING SHOP. (OTHER UNITS MELT BRASS ALLOYS.) THIS IS THE SOUTHERNMOST FURNACE OF THE FOUR PRESENTLY IN SITU. THE CURRENT CASTING SHOP WAS CONSTRUCTED DURING THE EARLY 1970'S, REPLACING THE ORIGINAL PRE-WWI FACILITY. STATIONS #02, 03, AND 04 EACH CONSIST OF A HOLDER FLANKED BY A PAIR OF 800 KW ELECTRIC MELTERS. THE HOLDER IS REHEATED AT 85,000 LBS. SHAKER BOX, LOCATED AT THE REAR OF EACH MELTER SUPPLY THE MIXTURE OF INGREDIENTS REQUIRED FOR EACH PARTICULAR ALLOY. ONE MEMBER OF THE THREE-MAN CASTING TEAMS IS RESPONSIBLE FOR SHAKING METAL INTO THE MELTERS. IN THE LOWER RIGHT ARE SHOWN THE MOLD STORAGE AREA AND THE FURNACE BUILDERS' AREA FOR CHIPPING AND REBRICKING OFF-LINE UNITS. - American Brass Foundry, 70 Sayre Street, Buffalo, Erie County, NY
VIEW OF THE #67 HOLDING FURNACE POURING AT #04 COPPER ...
VIEW OF THE #67 HOLDING FURNACE POURING AT #04 COPPER STATION IN THE CASTING SHOP. (OTHER UNITS MELT BRASS ALLOYS.) THIS IS THE SOUTHERNMOST FURNACE OF THE FOUR PRESENTLY IN SITU. THE CURRENT CASTING SHOP WAS CONSTRUCTED DURING THE EARLY 1970'S, REPLACING THE ORIGINAL PRE-WWI FACILITY. STATIONS #02,03, AND 04 EACH CONSIST OF A HOLDER FLANKED BY A PAIR OF 800 KW ELECTRIC MELTERS. THE HOLDER IS RATED AT 85,000 LBS. SHAKER BOXES, LOCATED AT THE REAR OF EACH MELTER SUPPLY THE MIXTURE OF INGREDIENTS REQUIRED FOR EACH PARTICULAR ALLOY. ONE MEMBER OF THE THREE-MAN CASTING TEAMS IS RESPONSIBLE FOR SHAKING METAL INTO THE MELTERS. IN THE LOWER RIGHT ARE SHOWN THE MOLD STORAGE AREA AND THE FURNACE BUILDERS' AREA FOR CHIPPING AND REBRICKING OFF-LINE UNITS. - American Brass Foundry, 70 Sayre Street, Buffalo, Erie County, NY
Evolution of high tooth replacement rates in sauropod dinosaurs.
D'Emic, Michael D; Whitlock, John A; Smith, Kathlyn M; Fisher, Daniel C; Wilson, Jeffrey A
2013-01-01
Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days). Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size), and derived titanosaurs and diplodocoids independently evolved the highest known tooth replacement rates among archosaurs.
Evolution of High Tooth Replacement Rates in Sauropod Dinosaurs
Smith, Kathlyn M.; Fisher, Daniel C.; Wilson, Jeffrey A.
2013-01-01
Background Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. Methodology/Principal Findings We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days). Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. Conclusions/Significance Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size), and derived titanosaurs and diplodocoids independently evolved the highest known tooth replacement rates among archosaurs. PMID:23874921
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... approval to replace the Unit 4 turbine at the Jordan Dam Project. Specifically, the licensee proposes the following work: complete turbine replacement, wicket gate system rehabilitation or replacement, gate stem bushing replacement, turbine and generator bearing refurbishment, and related component replacement. The...
Possibilities of vaccine manufacture in human diploid cell strains with a serum replacement factor.
Candal, F J; George, V G; Ades, E W
1991-07-01
Cell lines MDCK (canine kidney), BGM (Buffalo green monkey kidney) and human embryonic lung fibroblast will support viral growth efficiently in medium without serum. Both MRC-5 and WI-38 cell strains have been approved by the Food and Drug Administration for manufacturing viral vaccines against cytomegalovirus and varicella-zoster virus. In this study we examine these two cell lines and viruses for their ability to grow in medium containing a serum replacement. The serum substitute used is LPSR-1 (low protein serum replacement). Using LPSR-1 in defined medium, we demonstrate multipassage cell growth and viral cultivation and replication equivalent to those obtained in medium containing fetal bovine serum (FBS). Viral growth after complete elimination of FBS varies and depends on cell line and virus. Serum substitutes can eliminate FBS in the viral growth phase of vaccine production and reduce costs.
Management of Microcircuit Obsolescence in a Pre-Production ACAT-ID Missile Program
2002-12-01
and Engineering Center ASIC Application Specific Integrated Circuit AVCOM Avionics Component Obsolescence Management BRU Battery Replaceable Unit...then just a paper qualification, e.g. Board or Battery Replaceable Unit ( BRU ) testing. 5 After-market Package The Die is Available and Can Be...Encapsulated Microcircuits (PEM), speed change, failure rate) 8 Emulation Manufacture or re-engineering of a FFF Replacement 9 CCA or BRU Redesign Board
He, Tao; Zhang, Haijun; Wang, Jing; Wu, Shugeng; Yue, Hongyuan; Qi, Guanghai
2017-01-01
Cottonseed meal (CSM) is commonly used in hens’ diets to replace soybean meal (SBM). However, the molecular consequences of this substitution remains unclear. To investigate the impact of this substitution at the molecular level, iTRAQ combined with biochemical analysis was performed in Hy-Line W-36 hens supplemented with a mixed diet of CSM and SBM. Egg weight, albumen height, and Haugh unit were significantly reduced in the CSM100 group (100% crude protein of SBM replaced by CSM) compared with the SBM group (P<0.05). A total of 15 proteins, accounting for 75% of egg white proteins with various biological functions of egg whites, were found to be reduced. This finding may relate to the decrease of albumen quality in the CSM100 group. Oviduct magnum morphology and hormone analysis indicated that a reduced level of plasma progesterone caused reduced growth of the tubular gland and epithelial cells in the magnum, further decreasing egg white protein synthesis in the magnum. These findings help demonstrate the molecular mechanisms of a CSM diet that cause adverse effects on albumen quality, while also showing that SBM should not be totally replaced with CSM in a hen diet. PMID:28813468
77 FR 38124 - Inspector General; Line of Succession Designation, No. 23-C, Revision 5
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-26
... SMALL BUSINESS ADMINISTRATION Inspector General; Line of Succession Designation, No. 23-C, Revision 5 This document replaces and supersedes ``Delegation of Authority and Line of Succession No. 23-C, Revision 4.'' Line of Succession Designation, No. 23-C, Revision 5: Effective immediately, the Inspector...
49 CFR 192.150 - Passage of internal inspection devices.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) of this section, each new transmission line and each replacement of line pipe, valve, fitting, or other line component in a transmission line must be designed and constructed to accommodate the passage... TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Design of Pipeline...
49 CFR 192.150 - Passage of internal inspection devices.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) of this section, each new transmission line and each replacement of line pipe, valve, fitting, or other line component in a transmission line must be designed and constructed to accommodate the passage... TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Design of Pipeline...
49 CFR 192.150 - Passage of internal inspection devices.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) of this section, each new transmission line and each replacement of line pipe, valve, fitting, or other line component in a transmission line must be designed and constructed to accommodate the passage... TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Design of Pipeline...
49 CFR 192.150 - Passage of internal inspection devices.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) of this section, each new transmission line and each replacement of line pipe, valve, fitting, or other line component in a transmission line must be designed and constructed to accommodate the passage... TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Design of Pipeline...
β-Cell Replacement in Mice Using Human Type 1 Diabetes Nuclear Transfer Embryonic Stem Cells.
Sui, Lina; Danzl, Nichole; Campbell, Sean R; Viola, Ryan; Williams, Damian; Xing, Yuan; Wang, Yong; Phillips, Neil; Poffenberger, Greg; Johannesson, Bjarki; Oberholzer, Jose; Powers, Alvin C; Leibel, Rudolph L; Chen, Xiaojuan; Sykes, Megan; Egli, Dieter
2018-01-01
β-Cells derived from stem cells hold great promise for cell replacement therapy for diabetes. Here we examine the ability of nuclear transfer embryonic stem cells (NT-ESs) derived from a patient with type 1 diabetes to differentiate into β-cells and provide a source of autologous islets for cell replacement. NT-ESs differentiate in vitro with an average efficiency of 55% into C-peptide-positive cells, expressing markers of mature β-cells, including MAFA and NKX6.1. Upon transplantation in immunodeficient mice, grafted cells form vascularized islet-like structures containing MAFA/C-peptide-positive cells. These β-cells adapt insulin secretion to ambient metabolite status and show normal insulin processing. Importantly, NT-ES-β-cells maintain normal blood glucose levels after ablation of the mouse endogenous β-cells. Cystic structures, but no teratomas, were observed in NT-ES-β-cell grafts. Isogenic induced pluripotent stem cell lines showed greater variability in β-cell differentiation. Even though different methods of somatic cell reprogramming result in stem cell lines that are molecularly indistinguishable, full differentiation competence is more common in ES cell lines than in induced pluripotent stem cell lines. These results demonstrate the suitability of NT-ES-β-cells for cell replacement for type 1 diabetes and provide proof of principle for therapeutic cloning combined with cell therapy. © 2017 by the American Diabetes Association.
2013-04-22
ISS035-E-025557(22 April 2013) ---Multi-user Droplet Combustion Apparatus (MDCA) Hardware Replacement: Cassidy accessed the Combustion Integration Rack (CIR) Combustion Chamber and removed the MDCA Chamber Insert Assembly (CIA). He then replaced the MDCA Needle 1 due to a fuel line that was damaged during previous activities when the MDCA CIA was being removed from the Combustion Chamber.
DOE Office of Scientific and Technical Information (OSTI.GOV)
El-Jundi, I.M.
The Qatar NGL-2 plant, commissioned in December 1979, was designed to process the associated gas from the offshore crude oil fields of Qatar. The dehydrated, sour, lean gas and wet, sour liquids are transported by two separate lines to the Umm Said NGL complex about 120 km (75 miles) from the central offshore station. The 300-mm (12-in.) -diameter liquids line has suffered general pitting corrosion, and the 600-mm (24-in.) -diameter lean gas line has suffered corrosion and extensive hydrogen-induced cracking (HIC or HIPC). Neither line performed to its design parameters, and many problems in the downstream facilities have been experienced.more » All efforts to clean the solids (debris) from the liquids lines have failed. This in turn interfered with the planned corrosion control program, thus allowing corrosion to continue. Various specialists have investigated the lines in an attempt to find the origin of the solids and to recommend necessary remedial actions. Should the lines fail from pitting corrosion, the effect of a leak at a pressure of about 11 000 kPa (1,595 psi) will be very dangerous, especially if it occurs onshore. To protect the NGL-2 operations against possible risks - both in terms of safety and of losses in revenue - critical sections of the pipelines have been replaced, and all gas liquids pipelines will be replaced soon. Supplementary documents to the API standards were prepared for the replaced pipelines.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
El-Jundi, I.M.
Qatar NGL/2 plant, commissioned in December, 1979, was designed to process the associated gas from the offshore crude oil fields of Qatar. The dehydrated sour lean gas and wet sour liquids are transported via two separate lines to Umm Said NGL Complex about 120 kms. from the central offshore station. The liquids line 300 mm diameter (12 inch) has suffered general and severe pitting corrosion. The lean gas line 600 mm diameter (24 inch) has suffered corrosion and extensively hydrogen induced cracking (HIC), also known as HIPC. Both lines never performed to their design parameters and many problems in themore » downstream facilities have been experienced. All efforts to clean the liquids lines from the solids (debris) have failed. This inturn interfered with the planned corrosion control programe, thus allowing corrosion to continue. Investigation work has been done by various specialists in an attempt to find the origin of the solids and to recommend necessary remedial actions. Should lines fall from pitting corrosion, the effect of liquids leak at a pressure of about 11000 kpa will be very dangerous especially if it occurs onshore. In order to protect the NGL-2 operations against possible risks, both interms of safety as well as losses in revenue, critically sections of the pipelines have been replaced, whilst the whole gas liquids pipelines would be replaced shortly. Supplementary documents to the API standards were prepared by QPC for the replaced pipelines.« less
Molecular evolution of cyclin proteins in animals and fungi
2011-01-01
Background The passage through the cell cycle is controlled by complexes of cyclins, the regulatory units, with cyclin-dependent kinases, the catalytic units. It is also known that cyclins form several families, which differ considerably in primary structure from one eukaryotic organism to another. Despite these lines of evidence, the relationship between the evolution of cyclins and their function is an open issue. Here we present the results of our study on the molecular evolution of A-, B-, D-, E-type cyclin proteins in animals and fungi. Results We constructed phylogenetic trees for these proteins, their ancestral sequences and analyzed patterns of amino acid replacements. The analysis of infrequently fixed atypical amino acid replacements in cyclins evidenced that accelerated evolution proceeded predominantly during paralog duplication or after it in animals and fungi and that it was related to aromorphic changes in animals. It was shown also that evolutionary flexibility of cyclin function may be provided by consequential reorganization of regions on protein surface remote from CDK binding sites in animal and fungal cyclins and by functional differentiation of paralogous cyclins formed in animal evolution. Conclusions The results suggested that changes in the number and/or nature of cyclin-binding proteins may underlie the evolutionary role of the alterations in the molecular structure of cyclins and their involvement in diverse molecular-genetic events. PMID:21798004
High efficiency novel window air conditioner
Bansal, Pradeep
2015-07-24
This paper presents the technical development of a high efficiency window air conditioner. In order to achieve higher energy efficiency ratio (EER), the original capacity of the R410A unit was downgraded by replacing the original compressor with a lower capacity but higher EER compressor, while all heat exchangers and the chassis from the original unit were retained. The other subsequent major modifications included – the AC fan motor being replaced with a brushless high efficiency electronically commuted motor (ECM) motor, the capillary tube being replaced with a needle valve to better control the refrigerant flow and refrigerant set points, andmore » R410A being replaced with drop-in environmentally friendly binary mixture of R32 (85% molar concentration)/R125 (15% molar concentration). All these modifications resulted in significant EER enhancement of the modified unit.« less
High efficiency novel window air conditioner
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bansal, Pradeep
This paper presents the technical development of a high efficiency window air conditioner. In order to achieve higher energy efficiency ratio (EER), the original capacity of the R410A unit was downgraded by replacing the original compressor with a lower capacity but higher EER compressor, while all heat exchangers and the chassis from the original unit were retained. The other subsequent major modifications included – the AC fan motor being replaced with a brushless high efficiency electronically commuted motor (ECM) motor, the capillary tube being replaced with a needle valve to better control the refrigerant flow and refrigerant set points, andmore » R410A being replaced with drop-in environmentally friendly binary mixture of R32 (85% molar concentration)/R125 (15% molar concentration). All these modifications resulted in significant EER enhancement of the modified unit.« less
49 CFR 192.719 - Transmission lines: Testing of repairs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... pipe before it is installed. (b) Testing of repairs made by welding. Each repair made by welding in... 49 Transportation 3 2010-10-01 2010-10-01 false Transmission lines: Testing of repairs. 192.719... Transmission lines: Testing of repairs. (a) Testing of replacement pipe. If a segment of transmission line is...
Replaceable Inserts for Ship’s Line Handling Chocks
2006-10-30
terms on the cover page. Page 12 - Nelson Engineering Co. Contract # N6553806M0156 Replaceable Inserts for Ship’s Line Handling Chocks Phase I Final... Nelson Engineering CO. 3655 Sells Arbor Circle T11tusvlle, FL 32760 (321)269-1113 Fax (321)269-0506 www.NelsonEngrCo.com Topic N06-059 Final Phase...2006 Carolyi’ S. Seringer, Oice President, POC Expiration of SBIR Data Rights Period: October 30, 2011 Nelson Engineering Co. exerts its data rights
Java Tool Framework for Automation of Hardware Commissioning and Maintenance Procedures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ho, J C; Fisher, J M; Gordon, J B
2007-10-02
The National Ignition Facility (NIF) is a 192-beam laser system designed to study high energy density physics. Each beam line contains a variety of line replaceable units (LRUs) that contain optics, stepping motors, sensors and other devices to control and diagnose the laser. During commissioning and subsequent maintenance of the laser, LRUs undergo a qualification process using the Integrated Computer Control System (ICCS) to verify and calibrate the equipment. The commissioning processes are both repetitive and tedious when we use remote manual computer controls, making them ideal candidates for software automation. Maintenance and Commissioning Tool (MCT) software was developed tomore » improve the efficiency of the qualification process. The tools are implemented in Java, leveraging ICCS services and CORBA to communicate with the control devices. The framework provides easy-to-use mechanisms for handling configuration data, task execution, task progress reporting, and generation of commissioning test reports. The tool framework design and application examples will be discussed.« less
Chewing Tobacco: Not a Safe Alternative to Cigarettes
... chewed, sucked on or sniffed, rather than smoked. Nicotine is absorbed through the soft tissues of the mouth ... replacement therapy with nicotine gum or lozenges, a nicotine replacement that is also absorbed through the lining of the mouth, ...
30 CFR 7.69 - Approval marking.
Code of Federal Regulations, 2014 CFR
2014-07-01
... that the unit's components must not be disassembled or removed. (d) The replacement battery types if the unit has replaceable batteries. (e) A warning placed next to the charging connector that the battery only be charged in a fresh air location if rechargeable batteries are used. (f) A warning that the...
30 CFR 7.69 - Approval marking.
Code of Federal Regulations, 2010 CFR
2010-07-01
... that the unit's components must not be disassembled or removed. (d) The replacement battery types if the unit has replaceable batteries. (e) A warning placed next to the charging connector that the battery only be charged in a fresh air location if rechargeable batteries are used. (f) A warning that the...
30 CFR 7.69 - Approval marking.
Code of Federal Regulations, 2013 CFR
2013-07-01
... that the unit's components must not be disassembled or removed. (d) The replacement battery types if the unit has replaceable batteries. (e) A warning placed next to the charging connector that the battery only be charged in a fresh air location if rechargeable batteries are used. (f) A warning that the...
30 CFR 7.69 - Approval marking.
Code of Federal Regulations, 2011 CFR
2011-07-01
... that the unit's components must not be disassembled or removed. (d) The replacement battery types if the unit has replaceable batteries. (e) A warning placed next to the charging connector that the battery only be charged in a fresh air location if rechargeable batteries are used. (f) A warning that the...
30 CFR 7.69 - Approval marking.
Code of Federal Regulations, 2012 CFR
2012-07-01
... that the unit's components must not be disassembled or removed. (d) The replacement battery types if the unit has replaceable batteries. (e) A warning placed next to the charging connector that the battery only be charged in a fresh air location if rechargeable batteries are used. (f) A warning that the...
Control of three different continuous pharmaceutical manufacturing processes: Use of soft sensors.
Rehrl, Jakob; Karttunen, Anssi-Pekka; Nicolaï, Niels; Hörmann, Theresa; Horn, Martin; Korhonen, Ossi; Nopens, Ingmar; De Beer, Thomas; Khinast, Johannes G
2018-05-30
One major advantage of continuous pharmaceutical manufacturing over traditional batch manufacturing is the possibility of enhanced in-process control, reducing out-of-specification and waste material by appropriate discharge strategies. The decision on material discharge can be based on the measurement of active pharmaceutical ingredient (API) concentration at specific locations in the production line via process analytic technology (PAT), e.g. near-infrared (NIR) spectrometers. The implementation of the PAT instruments is associated with monetary investment and the long term operation requires techniques avoiding sensor drifts. Therefore, our paper proposes a soft sensor approach for predicting the API concentration from the feeder data. In addition, this information can be used to detect sensor drift, or serve as a replacement/supplement of specific PAT equipment. The paper presents the experimental determination of the residence time distribution of selected unit operations in three different continuous processing lines (hot melt extrusion, direct compaction, wet granulation). The mathematical models describing the soft sensor are developed and parameterized. Finally, the suggested soft sensor approach is validated on the three mentioned, different continuous processing lines, demonstrating its versatility. Copyright © 2018 Elsevier B.V. All rights reserved.
Current Practices on Nighttime Pavement Construction Asphaltic Concrete.
1982-07-01
repair: None g. Slab removals and replacements: None. h. Other ( mudjacking , asphalt underseal): None. i. Heater scarifying: None. j. Milling: None. k...g. Slab removals and replacements: None. h. Other ( mudjacking , asphalt underseal): None. i. Heater scarifying: None. j. Milling was performed...None e. "D" line cracking repair - None f. Spall repair - None g. Slab removals and replacements - None h. Other ( mudjacking , asphalt underseal) - None
Inexpensive cryogenic insulation replaces vacuum jacketed line
NASA Technical Reports Server (NTRS)
Fuchs, C. E.
1967-01-01
Commercially available aluminized Mylar, cork and fiber glass form a multilayered sealed system and provide rugged and economical field installed insulation for cryogenic /liquid nitrogen or oxygen/ pipe lines in an exposed environment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stovall, J.P.; RIzy, D.T.; Kisner, R.A.
The 3M Company has developed a high-temperature low-sag conductor referred to as Aluminum- Conductor Composite-Reinforced or ACCR. The conductor uses an aluminum metal matrix material to replace the steel in conventional conductors so the core has a lower density and higher conductivity. The objective of this work is to accelerate the commercial acceptance by electric utilities of these new conductor designs by testing four representative conductor classes in controlled conditions. Overhead transmission lines use bare aluminum conductor strands wrapped around a steel core strands to transmit electricity. The typical cable is referred to as aluminum-conductor steel-reinforced (ACSR). The outer strandsmore » are aluminum, chosen for its conductivity, low weight, and low cost. The center strand is of steel for the strength required to support the weight without stretching the aluminum due to its ductility. The power density of a transmission corridor has been directly increased by increasing the voltage level. Transmission voltages have increased from 115-kV to 765- kV over the past 80 years. In the United States, further increasing the voltage level is not feasible at this point in time, so in order to further increase the power density of a transmission corridor, conductor designs that increase the current carrying capability have been examined. One of the key limiting factors in the design of a transmission line is the conductor sag which determines the clearance of the conductor above ground or underlying structures needed for electrical safety. Increasing the current carrying capability of a conductor increases the joule heating in the conductor which increases the conductor sag. A conductor designed for high-temperature and lowsag operation requires an engineered modification of the conductor materials. To make an advanced cable, the 3M Company solution has been the development of a composite conductor consisting of Nextel ceramic fibers to replace the steel core and an aluminum-zirconium alloy to improve the outer strands. The result is a cable that can carry more current than steelaluminum lines without sagging as much at higher temperatures. A unique facility called the Powerline Conductor Accelerated Testing (PCAT) Facility was built at ORNL for testing overhead conductors. The PCAT has been uniquely designed for testing overhead bare transmission line conductors at high currents and temperatures after they have been installed and tensioned to the manufacturer's specifications. The ability to operate a transmission line conductor in this manner does not exist elsewhere in the United States. Four classes of ACCR cable designed by 3M have been successfully test at ORNL – small, medium, large and small/compact. Based on these and other manufacturer tests, the 3M Company has successfully introduced the ACCR into the commercial market and has completed over twenty installations for utility companies.« less
Mastracchio during EMU FPS Remove and Replace OPS
2014-04-14
Expedition 39 flight engineer Rick Mastracchio poses for a photo with the replacement Fan Pump Separator (FPS) and Extravehicular Mobility Unit (EMU) 3005. Image was taken in the Quest Airlock (A/L) during FPS remove and replace operations.
24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false One-for-one replacement of lower-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development DISPLACEMENT, RELOCATION ASSISTANCE, AND REAL PROPERTY...
24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false One-for-one replacement of lower-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development DISPLACEMENT, RELOCATION ASSISTANCE, AND REAL PROPERTY...
24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false One-for-one replacement of lower-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development DISPLACEMENT, RELOCATION ASSISTANCE, AND REAL PROPERTY...
24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false One-for-one replacement of lower-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development DISPLACEMENT, RELOCATION ASSISTANCE, AND REAL PROPERTY...
24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false One-for-one replacement of lower-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development DISPLACEMENT, RELOCATION ASSISTANCE, AND REAL PROPERTY...
Cartier, Clément; Doré, Evelyne; Laroche, Laurent; Nour, Shokoufeh; Edwards, Marc; Prévost, Michèle
2013-02-01
Release of lead from 80% partially replaced service lines was compared to full lead service lines using harvested-stabilized lead pipes and field brass connectors. After more than a year of stabilization, lead release was consistent with field samples. Over the relatively short duration partial replacement of lead pipe by copper pipe (3 months), generated high lead release, attributed to galvanic corrosion, resulting in a final outcome for lead release that was even worse than for a full lead pipe. Increased lead release was especially evident at higher flow rates. Orthophosphate reduced lead release from full lead pipes by 64%. For partially replaced samples with copper, lead concentrations were unchanged by phosphate dosing at moderate flow (103 ± 265 vs 169 ± 349 μg/L) and were increased to very high levels when sampled at high flow rates (1001 ± 1808 vs 257 ± 224 μg/L). The increase lead release was in the form of particulate lead (>90%). In comparison to the condition without treatment, increased sulfate treatment had little impact on lead release from 100%-Pb rigs but reduced lead release from partially replaced lead pipes with copper. Our results also raise questions concerning protocols based on short 30 min stagnation (as those used in Canada) due to their incapacity to consider particulate lead release generated mostly after longer stagnation. Copyright © 2012 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Sudarmono, Panggih; Deendarlianto; Widyaparaga, Adhika
2018-05-01
Public street lighting consumes large energy for the public interest, but many street lights still do not use energy-saving technologies. In 2014, Provincial Government of DKI Jakarta operated 179,305 units of street lights. Of the number of installed armature, 92 % of them or 166,441 units are HPS (High-Pressure Sodium) armatures which are inefficient. In 2016, the Provincial Government of DKI Jakarta cut down the energy used for street lighting, by implementing the programs of kWh-meter installation in every street lighting panel and use energy-saving lamps equipped with the smart system. The Provincial Government of DKI Jakarta is registered with 6,399 customer IDs in PLN (State Owned Electric Company), and gradually carried out the kWh Meter installation and changes to the contract. The program to use energy-saving lights done by replacing the HPS armature that is not energy efficient to LED armature which is known to be energy efficient. Until the end of 2016, the number of armatures that has been replaced was 89,417 units. The research results on 25 samples of PLN customer IDs and the replacement of 2,162 units armature, showed that the energy efficiency through kWh meter installation and armature replacement reduce the power consumption from 330,414 kWh to 71,278 kWh or by 78.43%. Generally, there was a decrease in the value of electricity bill compared to the before the replacement. The program of kWh-meter installations and replacement of the armature has a payback period of 2.66 years.
[High-contrast resolution of film-screen systems in oral and maxillofacial radiology].
Kaeppler, G; Reinert, S
2007-11-01
The aim was to determine differences in high-contrast resolution of film-screen systems used in dental panoramic and cephalometric radiography by calculating the modulation transfer function (MTF). The radiographs used to determine the MTF should be taken by the same x-ray units as those used for patient radiographs. The MTF was determined using a lead grid and according to DIN 6867-2 for 11 film-screen systems (speed 250, speed class 200 and 400) used in dental radiographic diagnostics. The optical density was measured using a microdensitometer developed by PTB. With 10% of the modulation transfer factor, newly developed film-screen systems (speed class 200 and 400) demonstrated a resolution of 4.9 to 6 line pairs per mm (panoramic radiography). In cephalometric radiography a film-screen system (speed class 400 and green-sensitive film) had a resolution of 4.2 line pairs per mm and surpassed two film-screen systems (speed class 400, resolution of 3 line pairs per mm, blue-sensitive films). The relevance of this study is underlined by the diagnostic reference doses defined in the German X-ray Ordinance (RöV) which are also intended for dentistry. Film-screen systems (speed 250, speed class 200) previously used in dental panoramic and cephalometric radiography can be replaced by newly developed film-screen systems (speed class 400). In dental radiography dose reductions are possible with film-screen systems (speed class 400) without impairing diagnostic accuracy. The introduction of newly developed film-screen systems (speed class 400) requires lower milliampere-seconds and therefore an adjustment of the x-ray units to lower milliampere settings.
Process Waste Assessment Machine and Fabrication Shop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phillips, N.M.
1993-03-01
This Process Waste Assessment was conducted to evaluate hazardous wastes generated in the Machine and Fabrication Shop at Sandia National Laboratories, Bonding 913, Room 119. Spent machine coolant is the major hazardous chemical waste generated in this facility. The volume of spent coolant generated is approximately 150 gallons/month. It is sent off-site to a recycler, but a reclaiming system for on-site use is being investigated. The Shop`s line management considers hazardous waste minimization very important. A number of steps have already been taken to minimize wastes, including replacement of a hazardous solvent with biodegradable, non-caustic solution and filtration unit; wastemore » segregation; restriction of beryllium-copper alloy machining; and reduction of lead usage.« less
Fixture for aligning motor assembly
Shervington, Roger M.; Vaghani, Vallabh V.; Vanek, Laurence D.; Christensen, Scott A.
2009-12-08
An alignment fixture includes a rotor fixture, a stator fixture and a sensor system which measures a rotational displacement therebetween. The fixture precisely measures rotation of a generator stator assembly away from a NULL position referenced by a unique reference spline on the rotor shaft. By providing an adjustable location of the stator assembly within the housing, the magnetic axes within each generator shall be aligned to a predetermined and controlled tolerance between the generator interface mounting pin and the reference spline on the rotor shaft. Once magnetically aligned, each generator is essentially a line replaceable unit which may be readily mounted to any input of a multi-generator gearbox assembly with the assurance that the magnetic alignment will be within a predetermined tolerance.
Systems Analysis and Structural Design of an Unpressurized Cargo Delivery Vehicle
NASA Technical Reports Server (NTRS)
Wu, K. Chauncey; Cruz, Jonathan N.; Antol, Jeffrey; Sasamoto, Washito A.
2007-01-01
The International Space Station will require a continuous supply of replacement parts for ongoing maintenance and repair after the planned retirement of the Space Shuttle in 2010. These parts are existing line-replaceable items collectively called Orbital Replacement Units, and include heavy and oversized items such as Control Moment Gyroscopes and stowed radiator arrays originally intended for delivery aboard the Space Shuttle. Current resupply spacecraft have limited to no capability to deliver these external logistics. In support of NASA's Exploration Systems Architecture Study, a team at Langley Research Center designed an Unpressurized Cargo Delivery Vehicle to deliver bulk cargo to the Space Station. The Unpressurized Cargo Delivery Vehicle was required to deliver at least 13,200 lbs of cargo mounted on at least 18 Flight Releasable Attachment Mechanisms. The Crew Launch Vehicle design recommended in the Exploration Systems Architecture Study would be used to launch one annual resupply flight to the International Space Station. The baseline vehicle design developed here has a cargo capacity of 16,000 lbs mounted on up to 20 Flight Releasable Attachment Mechanisms. Major vehicle components are a 5.5m-diameter cargo module containing two detachable cargo pallets with the payload, a Service Module to provide propulsion and power, and an aerodynamic nose cone. To reduce cost and risk, the Service Module is identical to the one used for the Crew Exploration Vehicle design.
Roadway data representation and application development : final report, December 2009.
DOT National Transportation Integrated Search
2009-08-06
The Straight-line Diagrammer, a web-based application to produce Straight-line Diagrams (SLDs) automatically, was developed in this project to replace old application (AutoSLD) which has outdated structure and limited capabilities.
On-line hemodiafiltration. Gold standard or top therapy?
Passlick-Deetjen, Jutta; Pohlmeier, Robert
2002-01-01
In summary, on-line HDF is an extracorporeal blood purification therapy with increased convective removal of uremic toxins as compared to the most frequently used low- or high-flux HD therapy. The clinical advantages of on-line HDF have shown to be dose dependent, which makes on-line HDF superior to other therapies with less convective solute removal. Among the therapies with high convective solute removal, i.e. on-line HDF, on-line HF and double high-flux dialysis, it is difficult to finally decide on the best therapy, as direct comparisons of these therapies are not performed. Theoretical considerations like the relative to on-line HDF lower achievable Kt/Vurea with on-line HF, allow to state that on-line HDF is the top therapy now available for patients with ESRD. A gold standard may be defined as something with which everything else is compared if one tries to establish it in the respective field. In order to declare on-line HDF as the gold standard in renal replacement therapy, we need more direct comparisons of on-line HDF with other therapies, including mortality as an outcome parameter. However, based on our current knowledge, it does not seem to be too speculative that high-quality clinical studies will establish on-line HDF in the next years as the new gold standard in renal replacement therapy.
Image Intensifier Modules For Use With Commercially Available Solid State Cameras
NASA Astrophysics Data System (ADS)
Murphy, Howard; Tyler, Al; Lake, Donald W.
1989-04-01
A modular approach to design has contributed greatly to the success of the family of machine vision video equipment produced by EG&G Reticon during the past several years. Internal modularity allows high-performance area (matrix) and line scan cameras to be assembled with two or three electronic subassemblies with very low labor costs, and permits camera control and interface circuitry to be realized by assemblages of various modules suiting the needs of specific applications. Product modularity benefits equipment users in several ways. Modular matrix and line scan cameras are available in identical enclosures (Fig. 1), which allows enclosure components to be purchased in volume for economies of scale and allows field replacement or exchange of cameras within a customer-designed system to be easily accomplished. The cameras are optically aligned (boresighted) at final test; modularity permits optical adjustments to be made with the same precise test equipment for all camera varieties. The modular cameras contain two, or sometimes three, hybrid microelectronic packages (Fig. 2). These rugged and reliable "submodules" perform all of the electronic operations internal to the camera except for the job of image acquisition performed by the monolithic image sensor. Heat produced by electrical power dissipation in the electronic modules is conducted through low resistance paths to the camera case by the metal plates, which results in a thermally efficient and environmentally tolerant camera with low manufacturing costs. A modular approach has also been followed in design of the camera control, video processor, and computer interface accessory called the Formatter (Fig. 3). This unit can be attached directly onto either a line scan or matrix modular camera to form a self-contained units, or connected via a cable to retain the advantages inherent to a small, light weight, and rugged image sensing component. Available modules permit the bus-structured Formatter to be configured as required by a specific camera application. Modular line and matrix scan cameras incorporating sensors with fiber optic faceplates (Fig 4) are also available. These units retain the advantages of interchangeability, simple construction, ruggedness, and optical precision offered by the more common lens input units. Fiber optic faceplate cameras are used for a wide variety of applications. A common usage involves mating of the Reticon-supplied camera to a customer-supplied intensifier tube for low light level and/or short exposure time situations.
Engineering test results for the Moog Single Line Disconnect
NASA Technical Reports Server (NTRS)
Glubke, Scott E.
1990-01-01
New and innovative types of disconnects will be required to service, resupply, and maintain future spacecraft subsystems. Efficiently maintaining orbiting scientific instruments, spacecraft support systems, and a manned space station over a long period of time will require the periodic replenishment of consumables and the replacement of components. To accomplish these tasks, the fluid disconnect must be designed to allow the connection and separation of fluid lines and components with minimal hazard to crew and equipment. The capability to simply connect a refueling line or to easily replace a failed component greatly extends the life of a space based fluid system. A test program was initiated to evaluate the Moog Single Line Disconnect. The objective of the test program was to demonstrate the operational characteristics of the disconnect and to verify compliance with current safety regulations. The results of the program are summarized in the referenced document.
Cadaveric aorta implantation for aortic graft infection.
Ali, Asad; Bahia, Sandeep S S; Ali, Tahir
2016-01-01
This case report describes a 73-year-old gentleman who underwent explantation of an infected prosthetic aorto-iliac graft and replacement with a cryopreserved thoracic and aorto-iliac allograft. The patient has been followed up a for more than a year after surgery and remains well. After elective tube graft repair of his abdominal aortic aneurysm (AAA) in 2003, he presented to our unit in 2012 in cardiac arrest as a result of a rupture of the distal graft suture line due to infection. After resuscitation he underwent aorto-bifemoral grafting using a cuff of the original aortic graft proximally. Distally the new graft was anastomosed to his common femoral arteries, with gentamicin beads left in situ. Post discharge the patient was kept under close surveillance with serial investigations including nuclear scanning, however it became apparent that his new graft was infected and that he would require aortic graft replacement, an operation with a mortality of at least 50%. The patient underwent the operation and findings confirmed a synthetic graft infection. This tube graft was explanted and a cryopreserved aorta was used to the refashion the abdominal aorta and its bifurcation. The operation required a return to theatre day one post operatively for a bleeding side branch, which was repaired. The patient went on to make a full recovery stepping down from the intensive therapy unit day 6 post operatively and went on to be discharged 32 days after his cryopreserved aorta implantation. Copyright © 2016 The Author(s). Published by Elsevier Ltd.. All rights reserved.
Impact of treatment on scale formation and lead release from aged LSLs
Background Municipalities have been replacing the public part of lead service lines (LSLs) by copper piping, which often leaves a lead section on the private side, resulting in partial LSL replacements. Depending on water chemistry, such practices may result in galvanic and depo...
Monetary benefits of preventing childhood lead poisoning with lead-safe window replacement.
Nevin, Rick; Jacobs, David E; Berg, Michael; Cohen, Jonathan
2008-03-01
Previous estimates of childhood lead poisoning prevention benefits have quantified the present value of some health benefits, but not the costs of lead paint hazard control or the benefits associated with housing and energy markets. Because older housing with lead paint constitutes the main exposure source today in the US, we quantify health benefits, costs, market value benefits, energy savings, and net economic benefits of lead-safe window replacement (which includes paint stabilization and other measures). The benefit per resident child from improved lifetime earnings alone is $21,195 in pre-1940 housing and $8685 in 1940-59 housing (in 2005 dollars). Annual energy savings are $130-486 per housing unit, with or without young resident children, with an associated increase in housing market value of $5900-14,300 per housing unit, depending on home size and number of windows replaced. Net benefits are $4490-5,629 for each housing unit built before 1940, and $491-1629 for each unit built from 1940-1959, depending on home size and number of windows replaced. Lead-safe window replacement in all pre-1960 US housing would yield net benefits of at least $67 billion, which does not include many other benefits. These other benefits, which are shown in this paper, include avoided Attention Deficit Hyperactivity Disorder, other medical costs of childhood lead exposure, avoided special education, and reduced crime and juvenile delinquency in later life. In addition, such a window replacement effort would reduce peak demand for electricity, carbon emissions from power plants, and associated long-term costs of climate change.
A COTS-Based Replacement Strategy for Aging Avionics Computers
2001-12-01
Communication Control Unit. A COTS-Based Replacement Strategy for Aging Avionics Computers COTS Microprocessor Real Time Operating System New Native Code...Native Code Objec ts Native Code Thread Real - Time Operating System Legacy Function x Virtual Component Environment Context Switch Thunk Add-in Replace
NASA Technical Reports Server (NTRS)
Foye, R. L.
1993-01-01
This report concerns the prediction of the elastic moduli and the internal stresses within the unit cell of a fabric reinforced composite. In the proposed analysis no restrictions or assumptions are necessary concerning yarn or tow cross-sectional shapes or paths through the unit cell but the unit cell itself must be a right hexagonal parallelepiped. All the unit cell dimensions are assumed to be small with respect to the thickness of the composite structure that it models. The finite element analysis of a unit cell is usually complicated by the mesh generation problems and the non-standard, adjacent-cell boundary conditions. This analysis avoids these problems through the use of preprogrammed boundary conditions and replacement materials (or elements). With replacement elements it is not necessary to match all the constitutional material interfaces with finite element boundaries. Simple brick-shaped elements can be used to model the unit cell structure. The analysis predicts the elastic constants and the average stresses within each constituent material of each brick element. The application and results of this analysis are demonstrated through several example problems which include a number of composite microstructures.
Li, Philip Kam-Tao; Chung, Kwok Yi; Chow, Kai Ming
2007-06-01
This article examines the roles of continuous ambulatory peritoneal dialysis (CAPD) versus automated peritoneal dialysis (APD) as first-line renal replacement therapy. To date, no high-quality large-scale randomized controlled studies have compared CAPD with APD as first-line therapy. However, a discussion on this issue is important so that nephrologists can decide and patients can have a choice of modality on which to start dialysis, especially in the context of health care economics. We review the literature and present Hong Kong as the model of a "CAPD first" policy, an appealing, cost-effective approach for any country. An ideal renal replacement therapy should provide optimal survival, lowest possible risk for comorbidity, highest level of quality of life, and equally important, acceptable cost to society. When we consider this subject in the context that all patients should be started on one first-line modality, the data suggest that a "CAPD first" policy has all these advantages, with APD probably having the edge only with regard to patient preference. The present review highlights preservation of residual renal function, removal and balancing of sodium, incidence of peritonitis, peritoneal membrane transport status, patient rehabilitation, and financial issues in demonstrating that a "CAPD first" policy is the model that should be adopted.
Electronic-type vacuum gauges with replaceable elements
Edwards, Jr., David
1984-01-01
In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge.
Uno, Shigeyuki; Endo, Kaori; Ishida, Yuji; Tateno, Chise; Makishima, Makoto; Yoshizato, Katsutoshi; Nebert, Daniel W.
2009-01-01
Human and rodent cytochrome P450 (CYP) enzymes sometimes exhibit striking species-specific differences in substrate preference and rate of metabolism. Human risk assessment of CYP substrates might therefore best be evaluated in the intact mouse by replacing mouse Cyp genes with human CYP orthologs; however, how “human-like” can human gene expression be expected in mouse tissues? Previously a bacterial-artificial-chromosome-transgenic mouse, carrying the human CYP1A1_CYP1A2 locus and lacking the mouse Cyp1a1 and Cyp1a2 orthologs, was shown to express robustly human dioxin-inducible CYP1A1 and basal versus inducible CYP1A2 (mRNAs, proteins, enzyme activities) in each of nine mouse tissues examined. Chimeric mice carrying humanized liver have also been generated, by transplanting human hepatocytes into a urokinase-type plasminogen activator(+/+)_severe-combined-immunodeficiency (uPA/SCID) line with most of its mouse hepatocytes ablated. Herein we compare basal and dioxin-induced CYP1A mRNA copy numbers, protein levels, and four enzymes (benzo[a]pyrene hydroxylase, ethoxyresorufin O-deethylase, acetanilide 4-hydroxylase, methoxyresorufin O-demethylase) in liver of these two humanized mouse lines versus wild-type mice; we also compare these same parameters in mouse Hepa-1c1c7 and human HepG2 hepatoma-derived established cell lines. Most strikingly, mouse liver CYP1A1-specific enzyme activities are between 38- and 170-fold higher than human CYP1A1-specific enzyme activities (per unit of mRNA), whereas mouse versus human CYP1A2 enzyme activities (per unit of mRNA) are within 2.5-fold of one another. Moreover, both the mouse and human hepatoma cell lines exhibit striking differences in CYP1A mRNA levels and enzyme activities. These findings are relevant to risk assessment involving human CYP1A1 and CYP1A2 substrates, when administered to mice as environmental toxicants or drugs. PMID:19285097
DOE Office of Scientific and Technical Information (OSTI.GOV)
Uno, Shigeyuki; Endo, Kaori; Ishida, Yuji
2009-05-15
Human and rodent cytochrome P450 (CYP) enzymes sometimes exhibit striking species-specific differences in substrate preference and rate of metabolism. Human risk assessment of CYP substrates might therefore best be evaluated in the intact mouse by replacing mouse Cyp genes with human CYP orthologs; however, how 'human-like' can human gene expression be expected in mouse tissues? Previously a bacterial-artificial-chromosome-transgenic mouse, carrying the human CYP1A1{sub C}YP1A2 locus and lacking the mouse Cyp1a1 and Cyp1a2 orthologs, was shown to express robustly human dioxin-inducible CYP1A1 and basal versus inducible CYP1A2 (mRNAs, proteins, enzyme activities) in each of nine mouse tissues examined. Chimeric mice carryingmore » humanized liver have also been generated, by transplanting human hepatocytes into a urokinase-type plasminogen activator(+/+){sub s}evere-combined-immunodeficiency (uPA/SCID) line with most of its mouse hepatocytes ablated. Herein we compare basal and dioxin-induced CYP1A mRNA copy numbers, protein levels, and four enzymes (benzo[a]pyrene hydroxylase, ethoxyresorufin O-deethylase, acetanilide 4-hydroxylase, methoxyresorufin O-demethylase) in liver of these two humanized mouse lines versus wild-type mice; we also compare these same parameters in mouse Hepa-1c1c7 and human HepG2 hepatoma-derived established cell lines. Most strikingly, mouse liver CYP1A1-specific enzyme activities are between 38- and 170-fold higher than human CYP1A1-specific enzyme activities (per unit of mRNA), whereas mouse versus human CYP1A2 enzyme activities (per unit of mRNA) are within 2.5-fold of one another. Moreover, both the mouse and human hepatoma cell lines exhibit striking differences in CYP1A mRNA levels and enzyme activities. These findings are relevant to risk assessment involving human CYP1A1 and CYP1A2 substrates, when administered to mice as environmental toxicants or drugs.« less
Kostygina, Ganna; England, Lucinda; Ling, Pamela
2016-07-01
Tobacco companies have begun to acquire pharmaceutical subsidiaries and recently started to market nicotine replacement therapies, such as Zonnic nicotine gum, in convenience stores. Conversely, tobacco companies are producing tobacco products such as tobacco chewing gum and lozenges that resemble pharmaceutical nicotine replacement products, including a nicotine pouch product that resembles snus pouches. This convergence of nicotine and tobacco product marketing has implications for regulation and tobacco cessation.
Program Enhances Drawings Of Three-Dimensional Objects
NASA Technical Reports Server (NTRS)
Hedgley, David R., Jr.
1992-01-01
SILHOUETTE is program for line drawings rendering any subset of polygons as silhouette. Program is improvement on, and replacement for, HIDDEN LINE COMPUTER CODE (ARC-11446). Offers combinations of silhouette and nonsilhouette specifications for arbitrary solid. Written in FORTRAN 77.
Dual-Band Microstrip Antenna With Reactive Loading
NASA Technical Reports Server (NTRS)
Davidson, Shayla E.
1988-01-01
Effective but bulky coaxial stub replaced. Short-circuited microstrip transmission line serves as reactive loading element for microstrip antenna. Constructed integrally with stripline radiating element, shorted line preserves low microstrip profile and enables tuning of antenna for two-band operation.
Mobile dental operations: capital budgeting and long-term viability.
Arevalo, Oscar; Chattopadhyay, Amit; Lester, Harold; Skelton, Judy
2010-01-01
The University of Kentucky College of Dentistry (UKCD) runs a large mobile dental operation. Economic conditions dictate that as the mobile units age it will be harder to find donors willing or able to provide the financial resources for asset replacement. In order to maintain current levels of access for the underserved, consideration of replacement is paramount. A financial analysis for a new mobile unit was conducted to determine self-sustainability, return on investment (ROI), and feasibility of generating a cash reserve for its replacement in 12 years. Information on clinical income, operational and replacement costs, and capital costs was collected. A capital budgeting analysis (CBA) was conducted using the Net Present Value (NPV) methodology in four different scenarios. Depreciation funding was calculated by transferring funds from cash inflows and reinvested to offset depreciation at fixed compound interest. A positive ROI was obtained for two scenarios. He depreciation fund did not generate a cash reserve sufficient to replace the mobile unit. Mobile dental programs can play a vital role in providing access to care to underserved populations and ensuring their mission requires long-term planning. Careful financial viability and CBA based on sound assumptions are excellent decision-making tools.
Preliminary results from scales formed 38 weeks following the LSL replacement simulations revealed differences in scale formations amongst varying water qualities and pipe sequence. Rigs fed with dechlorinated tap water show distinct pH gradients between the galvanic and the back...
46 CFR 176.700 - Permission for repairs and alterations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers... 46 Shipping 7 2012-10-01 2012-10-01 false Permission for repairs and alterations. 176.700 Section... (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.700 Permission for...
46 CFR 176.700 - Permission for repairs and alterations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers... 46 Shipping 7 2013-10-01 2013-10-01 false Permission for repairs and alterations. 176.700 Section... (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.700 Permission for...
46 CFR 176.700 - Permission for repairs and alterations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers... 46 Shipping 7 2014-10-01 2014-10-01 false Permission for repairs and alterations. 176.700 Section... (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.700 Permission for...
46 CFR 176.700 - Permission for repairs and alterations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers... 46 Shipping 7 2011-10-01 2011-10-01 false Permission for repairs and alterations. 176.700 Section... (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.700 Permission for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-07
... Proposed Brandywine Creek Replacement Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Brandywine Creek Replacement... assesses the potential environmental effects of the construction and operation of the Brandywine Creek...
46 CFR 176.700 - Permission for repairs and alterations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers... 46 Shipping 7 2010-10-01 2010-10-01 false Permission for repairs and alterations. 176.700 Section... (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.700 Permission for...
How Prepared Are Medical and Nursing Students to Identify Common Hazards in the Intensive Care Unit?
Clay, Alison S; Chudgar, Saumil M; Turner, Kathleen M; Vaughn, Jacqueline; Knudsen, Nancy W; Farnan, Jeanne M; Arora, Vineet M; Molloy, Margory A
2017-04-01
Care in the hospital is hazardous. Harm in the hospital may prolong hospitalization, increase suffering, result in death, and increase costs of care. Although the interprofessional team is critical to eliminating hazards that may result in adverse events to patients, professional students' formal education may not prepare them adequately for this role. To determine if medical and nursing students can identify hazards of hospitalization that could result in harm to patients and to detect differences between professions in the types of hazards identified. Mixed-methods observational study of graduating nursing (n = 51) and medical (n = 93) students who completed two "Room of Horrors" simulations to identify patient safety hazards. Qualitative analysis was used to extract themes from students' written hazard descriptions. Fisher's exact test was used to determine differences in frequency of hazards identified between groups. Identification of hazards by students was low: 66% did not identify missing personal protective equipment for a patient on contact isolation, and 58% did not identify a medication administration error (medication hanging for a patient with similar name). Interprofessional differences existed in how hazards were identified: medical students noted that restraints were not indicated (73 vs. 2%, P < 0.001), whereas nursing students noted that there was no order for the restraints (58.5 vs. 0%, P < 0.0001). Nursing students discovered more issues with malfunctioning or incorrectly used equipment than medical students. Teams performed better than individuals, especially for hazards in the second simulation that were similar to those in the first: need to replace a central line with erythema (73% teams identified) versus need to replace a peripheral intravenous line (10% individuals, P < 0.0001). Nevertheless, teams of students missed many intensive care unit-specific hazards: 54% failed to identify the presence of pressure ulcers; 85% did not notice high tidal volumes on the ventilator; and 90% did not identify the absence of missing spontaneous awakening/breathing trials and absent stress ulcer prophylaxis. Graduating nursing and medical students missed several hazards of hospitalization, especially those related to the intensive care unit. Orientation for residents and new nurses should include education on hospitalization hazards. Ideally, this orientation should be interprofessional to allow appreciation for each other's roles and responsibilities.
Design issues for semi-passive optical communication devices
NASA Astrophysics Data System (ADS)
Glaser, I.
2007-09-01
Optical smart cards are devices containing a retro-reflector, light modulator, and some computing and data storage capabilities to affect semi-passive communication. They do not produce light; instead they modulate and send back light received from a stationary unit. These devices can replace contact-based smart cards as well as RF based ones for applications ranging from identification to transmitting and validating data. Since their transmission is essentially focused on the receiving unit, they are harder to eavesdrop than RF devices, yet need no physical contact or alignment. In this paper we explore optical design issues of these devices and estimate their optical behavior. Specifically, we analyze how these compact devices can be optimized for selected application profiles. Some of the key parameters addressed are effective light efficiency (how much modulated signal can be received by the stationary unit given the amount of light it transmits), range of tilt angles (angle between device surface normal to the line connecting the optical smart card with the stationary unit) through which the device would be effective, and power requirements of the semi-passive unit. In addition, issues concerning compact packaging of this device are discussed. Finally, results of the analysis are employed to produce a comparison of achievable capabilities of these optical smart cards, as opposed to alternative devices, and discuss potential applications were they can be best utilized.
76 FR 79051 - Airworthiness Directives; Lycoming Engines, Fuel Injected Reciprocating Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-21
... models requiring inspections. We are issuing this AD to prevent failure of the fuel injector fuel lines... to prevent failure of the fuel injector fuel lines that would allow fuel to spray into the engine... injector nozzles, and replace as necessary any fuel injector fuel line and clamp that does not meet all...
Tomatsu, Shunji; Montaño, Adriana M.; Oikawa, Hirotaka; Dung, Vu Chi; Hashimoto, Amiko; Oguma, Toshihiro; Takahashi, Tatsuo; Shimada, Tsutomu; Orii, Tadao; Sly, William S.
2014-01-01
We treated mucopolysaccharidosis IVA (MPS IVA) mice to assess the effects of long-term enzyme replacement therapy (ERT) initiated at birth, since adult mice treated by ERT showed little improvement in bone pathology (1). To conduct ERT in newborn mice, we used recombinant human N-acetylgalactosamine-6-sulfate sulfatase (GALNS) produced in a CHO cell line. First, to observe the tissue distribution pattern, a dose of 250 units/g body weight was administered intravenously in MPS IVA mice at day 2 or 3. The infused enzyme was primarily recovered in liver and spleen, with detectable activity in bone and brain. Second, newborn ERT was conducted after tissue distribution study. The first injection of newborn ERT was performed intravenously, the second to fourth weekly injections were intraperitoneal, and the remaining injections from 5th to 14th week were intravenous into the tail vein. MPS IVA mice treated with GALNS showed clearance of lysosomal storage in liver, spleen, and sinus lining cells in bone marrow. The column structure of the growth plate was organized better than adult mice treated with ERT; however, hyaline and fibrous cartilage cells in femur, spine, ligaments, discs, synovium, and periosteum still had storage materials to some extent. Heart valves were refractory to the treatment. Levels of serum keratan sulfate were kept normal in newborn ERT mice. In conclusion, the enzyme, which enters the cartilage before the cartilage cell layer becomes mature, prevents disorganization of column structure. Early treatment from birth leads to partial remission of bone pathology in MPS IVA mouse. PMID:24953405
Pham, Tuyen Danh; Nguyen, Dat Tien; Kim, Wan; Park, Sung Ho; Park, Kang Ryoung
2018-01-01
In automatic paper currency sorting, fitness classification is a technique that assesses the quality of banknotes to determine whether a banknote is suitable for recirculation or should be replaced. Studies on using visible-light reflection images of banknotes for evaluating their usability have been reported. However, most of them were conducted under the assumption that the denomination and input direction of the banknote are predetermined. In other words, a pre-classification of the type of input banknote is required. To address this problem, we proposed a deep learning-based fitness-classification method that recognizes the fitness level of a banknote regardless of the denomination and input direction of the banknote to the system, using the reflection images of banknotes by visible-light one-dimensional line image sensor and a convolutional neural network (CNN). Experimental results on the banknote image databases of the Korean won (KRW) and the Indian rupee (INR) with three fitness levels, and the Unites States dollar (USD) with two fitness levels, showed that our method gives better classification accuracy than other methods. PMID:29415447
Testing of the 3M Company Composite Conductor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stovall, John P; Rizy, D Tom; Kisner, Roger A
2010-10-01
The 3M Company has developed a high-temperature low-sag conductor referred to as Aluminum-Conductor Composite-Reinforced or ACCR. The conductor uses an aluminum metal matrix material to replace the steel in conventional conductors. The objective of this work is to accelerate the commercial acceptance by electric utilities of this new conductor design by testing four representative conductor classes in controlled conditions. A unique facility called the Powerline Conductor Accelerated Testing (PCAT) Facility was built at ORNL for testing overhead conductors. The PCAT has been uniquely designed for testing overhead bare transmission line conductors at high currents and temperatures after they have beenmore » installed and tensioned to the manufacturer's specifications. The ability to operate a transmission line conductor in this manner does not exist elsewhere in the United States. Four classes of ACCR cable designed by the 3M Company have been successfully test at ORNL small, medium, large and small/compact. Based on these and other manufacturer tests, the 3M Company has successfully introduced the ACCR into the commercial market and has completed over twenty installations for utility companies.« less
Electronic-type vacuum gauges with replaceable elements
Edwards, D. Jr.
1984-09-18
In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge. 5 figs.
Speed and accuracy improvements in FLAASH atmospheric correction of hyperspectral imagery
NASA Astrophysics Data System (ADS)
Perkins, Timothy; Adler-Golden, Steven; Matthew, Michael W.; Berk, Alexander; Bernstein, Lawrence S.; Lee, Jamine; Fox, Marsha
2012-11-01
Remotely sensed spectral imagery of the earth's surface can be used to fullest advantage when the influence of the atmosphere has been removed and the measurements are reduced to units of reflectance. Here, we provide a comprehensive summary of the latest version of the Fast Line-of-sight Atmospheric Analysis of Spectral Hypercubes atmospheric correction algorithm. We also report some new code improvements for speed and accuracy. These include the re-working of the original algorithm in C-language code parallelized with message passing interface and containing a new radiative transfer look-up table option, which replaces executions of the MODTRAN model. With computation times now as low as ~10 s per image per computer processor, automated, real-time, on-board atmospheric correction of hyper- and multi-spectral imagery is within reach.
NASA Astrophysics Data System (ADS)
Wessel, Hans Peter; Lucas, Susana Dias
The important roles of oligosaccharides in physiological and pathophysiological processes have spurred the development of mimetics. Oligosaccharide mimetics discussed in this chapter may possess a linker of two or more atoms such as amide or urea groups that may lead to isosteric linkage replacements but mostly do not. Larger groups that replace a full sugar unit we refer to as spacers and have grouped molecules with flexible acyclic spacers and more rigid cyclic spacers . The employment of pharmacophore models has led to oligosaccharide mimetics with only one sugar unit or finally without any saccharide unit as exemplified in mimotopes.
Testing of Replacement Bag Material
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laurinat, J.E.
1998-11-03
Recently, the FB-Line bagout material was changed to simplify the processing of sand, slag, and crucible.The results of the strength tests and the outgassing measurements and calculations demonstrate that the proposed replacement nylon bag materials (HRMP and orange anti-static material) are acceptable substitutes for LDPE and the original nylon with respect to mechanical properties.
Development and Application of Laser Peening System for PWR Power Plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Masaki Yoda; Itaru Chida; Satoshi Okada
2006-07-01
Laser peening is a process to improve residual stress from tensile to compressive in surface layer of materials by irradiating high-power laser pulses on the material in water. Toshiba has developed a laser peening system composed of Q-switched Nd:YAG laser oscillators, laser delivery equipment and underwater remote handling equipment. We have applied the system for Japanese operating BWR power plants as a preventive maintenance measure for stress corrosion cracking (SCC) on reactor internals like core shrouds or control rod drive (CRD) penetrations since 1999. As for PWRs, alloy 600 or 182 can be susceptible to primary water stress corrosion crackingmore » (PWSCC), and some cracks or leakages caused by the PWSCC have been discovered on penetrations of reactor vessel heads (RVHs), reactor bottom-mounted instrumentation (BMI) nozzles, and others. Taking measures to meet the unconformity of the RVH penetrations, RVHs themselves have been replaced in many PWRs. On the other hand, it's too time-consuming and expensive to replace BMI nozzles, therefore, any other convenient and less expensive measures are required instead of the replacement. In Toshiba, we carried out various tests for laser-peened nickel base alloys and confirmed the effectiveness of laser peening as a preventive maintenance measure for PWSCC. We have developed a laser peening system for PWRs as well after the one for BWRs, and applied it for BMI nozzles, core deluge line nozzles and primary water inlet nozzles of Ikata Unit 1 and 2 of Shikoku Electric Power Company since 2004, which are Japanese operating PWR power plants. In this system, laser oscillators and control devices were packed into two containers placed on the operating floor inside the reactor containment vessel. Laser pulses were delivered through twin optical fibers and irradiated on two portions in parallel to reduce operation time. For BMI nozzles, we developed a tiny irradiation head for small tubes and we peened the inner surface around J-groove welds after laser ultrasonic testing (LUT) as the remote inspection, and we peened the outer surface and the weld for Ikata Unit 2 supplementary. For core deluge line nozzles and primary water inlet nozzles, we peened the inner surface of the dissimilar metal welding, which is of nickel base alloy, joining a safe end and a low alloy metal nozzle. In this paper, the development and the actual application of the laser peening system for PWR power plants will be described. (authors)« less
The management of failed ankle replacement.
Kotnis, R; Pasapula, C; Anwar, F; Cooke, P H; Sharp, R J
2006-08-01
Advances in the design of the components for total ankle replacement have led to a resurgence of interest in this procedure. Between January 1999 and December 2004, 16 patients with a failed total ankle replacement were referred to our unit. In the presence of infection, a two-stage salvage procedure was planned. The first involved the removal of the components and the insertion of a cement spacer. Definitive treatment options included hindfoot fusion with a circular frame or amputation. When there was no infection, a one-stage salvage procedure was planned. Options included hindfoot fusion with an intramedullary nail or revision total ankle replacement. When there was suspicion of infection, a percutaneous biopsy was performed. The patients were followed up for a minimum of 12 months. Of the 16 patients, 14 had aseptic loosening, five of whom underwent a revision total ankle replacement and nine a hindfoot fusion. Of the two with infection, one underwent fusion and the other a below-knee amputation. There were no cases of wound breakdown, nonunion or malunion. Management of the failed total ankle replacement should be performed by experienced surgeons and ideally in units where multidisciplinary support is available. Currently, a hindfoot fusion appears to be preferable to a revision total ankle replacement.
Developing conjugated polymers with high electron affinity by replacing a C-C unit with a B←N unit.
Dou, Chuandong; Ding, Zicheng; Zhang, Zijian; Xie, Zhiyuan; Liu, Jun; Wang, Lixiang
2015-03-16
The key parameters of conjugated polymers are lowest unoccupied molecular orbital (LUMO) and highest occupied molecular orbital (HOMO) energy levels. Few approaches can simultaneously lower LUMO and HOMO energy levels of conjugated polymers to a large extent (>0.5 eV). Disclosed herein is a novel strategy to decrease both LUMO and HOMO energy levels of conjugated polymers by about 0.6 eV through replacement of a C-C unit by a B←N unit. The replacement makes the resulting polymer transform from an electron donor into an electron acceptor, and is proven by fluorescence quenching experiments and the photovoltaic response. This work not only provides an effective approach to tune the LUMO/HOMO energy levels of conjugated polymers, but also uses organic boron chemistry as a new toolbox to develop conjugated polymers with high electron affinity for polymer optoelectronic devices. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-06
... balance replacement funds and certified in lieu funds--paid from the general funds of the United States Treasury and not subject to annual appropriations. Prior balance replacement funds are authorized by...(h)(1) and (h)(2) of SMCRA (prior balance replacement funding and certified in lieu funding...
Design and operation experience of 230 MWe CFB boilers at Turow power plant in Poland
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nowak, W.; Bis, Z.; Laskawiec, J.
The Power Station Turow is located in Bogatynia, Poland, and has operated 10 pulverized coal units each of 200 MW. The plant provided 2000 MW at the lowest cost per kWh in Poland. The Turow units have approached and in some cases already gone beyond their 25--30 year's design life. To meet Poland's new environmental standards, which are now compatible with the EU, Turow decided to replace and upgrade six units (No. 1 to 6) from 200 MW to 230 MW units and remove one unit No. 7. Units No. 8, 9 and 10 were equipped with dry sorbent desulfurizationmore » technology. Units No. 1 and 2 have been replaced with new clean coal circulating fluidized bed technology. The Power Station Turow with six CFB units is to be the largest in the world power station based on fluidized bed technology.« less
Salem, Daliah; Natto, Zuhair; Elangovan, Satheesh; Karimbux, Nadeem
2016-08-01
The aim of this review is to evaluate the levels of clinical evidence for bone replacement grafts available in the United States for periodontics and oral implantology purposes. A search was performed using PubMed, the Cochrane Library, and Google Scholar for articles relating to the use of bone replacement grafts in implant and/or periodontics by two independent reviewers. Articles unrelated to the topic, not involving patients, not including abstracts, or in languages other than English were excluded. Selected articles were graded according to "levels of evidence" based on guidelines originally introduced by Wright et al. (2003). There was limited published peer-reviewed clinical literature available regarding US commercially available bone replacement grafts in periodontics and oral implantology. Of 144 bone replacement grafts available in the United States according to Avila-Ortiz et al. (2013), only 52 met the inclusion criteria. The majority of materials used were allografts (26 of 93 available in the United States), followed by alloplasts (15 of 30) and xenografts (11 of 21). Dental providers should be aware of the limited evidence that qualified for a strong rating supporting the clinical efficacy of these materials for periodontics and oral implantology purposes using the inclusion criteria selected in this study.
Imamura, Aya; Ogawa, Miho; Yasukawa, Masato; Yamazaki, Hiromichi; Morita, Ritsuko; Ikeda, Etsuko; Nakao, Kazuhisa; Takano-Yamamoto, Teruko; Kasugai, Shohei; Saito, Masahiro; Tsuji, Takashi
2011-01-01
Donor organ transplantation is currently an essential therapeutic approach to the replacement of a dysfunctional organ as a result of disease, injury or aging in vivo. Recent progress in the area of regenerative therapy has the potential to lead to bioengineered mature organ replacement in the future. In this proof of concept study, we here report a further development in this regard in which a bioengineered tooth unit comprising mature tooth, periodontal ligament and alveolar bone, was successfully transplanted into a properly-sized bony hole in the alveolar bone through bone integration by recipient bone remodeling in a murine transplantation model system. The bioengineered tooth unit restored enough the alveolar bone in a vertical direction into an extensive bone defect of murine lower jaw. Engrafted bioengineered tooth displayed physiological tooth functions such as mastication, periodontal ligament function for bone remodeling and responsiveness to noxious stimulations. This study thus represents a substantial advance and demonstrates the real potential for bioengineered mature organ replacement as a next generation regenerative therapy. PMID:21765896
Rehabilitation of a 410-MW utility boiler at Costa Sur, Puerto Rico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosado, R.; Salmeron, M.
1995-12-31
To increase unit reliability and availability and to meet the current and future electric power demands in Puerto Rico, the Puerto Rico Electric Power Authority (PREPA) recently performed a scheduled outage rehabilitation of Costa Sur Power Station Unit 5. This major rehabilitation of a 23-year-old, 410 MW, oil-fired boiler was accompanied by the upgrading of the low-pressure turbine with new rotors. The boiler rehabilitation included the replacement of all waterwall floor panels from just below the burner windbox, down to the lower drum. Temporary support was provided for the lower drum and its structural system during the panel replacement. Themore » steam drum internals were completely rehabilitated, with the installation of a new liner and cleaning and repair of other internals as required. The superheater and reheater desuperheater liners were also replaced. In addition, all major components of both the firing system and the air preheaters were replaced. The gas recirculation fan was rehabilitated, and its discharge duct was replaced.« less
Everson, Matthew; Webber, Lucy; Penfold, Chris; Shah, Sanjoy; Freshwater-Turner, Dan
2016-11-01
We assessed the impact of heparinised saline versus 0.9% normal saline on arterial line patency. Maintaining the patency of arterial lines is essential for obtaining accurate physiological measurements, enabling blood sampling and minimising line replacement. Use of heparinised saline is associated with risks such as thrombocytopenia, haemorrhage and mis-selection. Historical studies draw variable conclusions but suggest that normal saline is at least as effective at maintaining line patency, although recent evidence has questioned this. We conducted a prospective analysis of the use of heparinised saline versus normal saline on unselected patients in the intensive care of our hospital. Data concerning duration of 471 lines insertion and reason for removal was collected. We found a higher risk of blockage for lines flushed with normal saline compared with heparinised saline (RR = 2.15, 95% CI 1.392-3.32, p ≤ 0.001). Of the 56 lines which blocked initially (19 heparinised saline and 37 normal saline lines), 16 were replaced with new lines; 5 heparinised saline lines and 11 normal saline lines were reinserted; 5 of these lines subsequently blocked again, 3 of which were flushed with normal saline. Our study demonstrates a clinically important reduction in arterial line longevity due to blockages when flushed with normal saline compared to heparinised saline. We have determined that these excess blockages have a significant clinical impact with further lines being inserted after blockage, resulting in increased risks to patients, wasted time and cost of resources. Our findings suggest that the current UK guidance favouring normal saline flushes should be reviewed.
1990-05-01
L0341 K ISOLATE MALFUNCTIONS TO DIRECTIONAL COUPLERS - 6 L0436 A REMOVE OR REPLACE TWTS - 6 M0443 A ALIGN DELAY EQUALIZER COMPONENTS - 6 M0447 A ALIGN...CONTROLS - 6 L0390 A PERFORM OPERATIONAL TESTS ON RECEIVER TRANSMITTER CONTROLS - 6 LO0O1 A PERFORM PHIS ON TWT SHF TRANSMITTERS - 6 L0410 A REMOVE OR...REPLACE DIRECTIONAL COUPLERS - 6 L0420 A REMOVE OR REPLACE LINE VOLTAGE REGULATORS - 6 L0435 A REMOVE OR REPLACE TWT SHF TRANSMITTERS - 6 L0436 A
Direct current power delivery system and method
Zhang, Di; Garces, Luis Jose; Dai, Jian; Lai, Rixin
2016-09-06
A power transmission system includes a first unit for carrying out the steps of receiving high voltage direct current (HVDC) power from an HVDC power line, generating an alternating current (AC) component indicative of a status of the first unit, and adding the AC component to the HVDC power line. Further, the power transmission system includes a second unit for carrying out the steps of generating a direct current (DC) voltage to transfer the HVDC power on the HVDC power line, wherein the HVDC power line is coupled between the first unit and the second unit, detecting a presence or an absence of the added AC component in the HVDC power line, and determining the status of the first unit based on the added AC component.
Single Project Replaces District's Windows.
ERIC Educational Resources Information Center
American School and University, 1981
1981-01-01
The towns of Maplewood and South Orange (New Jersey) earmarked over $1 million, raised from a bond issue, to replace with thermal aluminum-framed units the 2400 worn out windows in eight 50-year-old schools. (Author)
Code of Federal Regulations, 2010 CFR
2010-07-01
... produce within 500 feet of a unit or lease line? 250.1156 Section 250.1156 Mineral Resources MINERALS... I take to receive approval to produce within 500 feet of a unit or lease line? (a) You must obtain... any portion of the completed interval less than 500 feet from a unit or lease line. Submit to MMS the...
Incidence and Patient Outcomes in Renal Replacement Therapy After Orthotopic Liver Transplant.
Ayhan, Asude; Ersoy, Zeynep; Ulas, Aydin; Zeyneloglu, Pinar; Pirat, Arash; Haberal, Mehmet
2017-02-01
Our objective was to evaluate the incidence of renal replacement therapy after orthotopic liver transplant and to evaluate and analyze patient outcomes. We performed a retrospective analysis of 177 consecutive patients at a tertiary care unit who underwent orthotopic liver transplant between January 2010 and June 2016. Patients who were admitted to the intensive care unit after orthotopic liver transplant and who required renal replacement therapy were included. A total of 177 (79 adult, 98 pediatric) orthotopic liver transplants were performed during the study period. Of these, 35 patients (19%) required renal replacement therapy during the early posttransplantation period. After excluding 5 patients with previous chronic renal failure, 30 patients (17%; 20 adult [25% ], 10 pediatric [10% ]) with acute kidney injury required renal replacement therapy. The mean patient age was 31.1 ± 20.0 years, with a mean Model for End-stage Liver Disease score of 16.7 ± 12.3. Of the patients with acute kidney injury who underwent renal replacement therapy, in-hospital mortality was 23.3% (7 of 30 patients), and 40% remained on dialysis. No significant difference was seen in mortality between early versus delayed initiation of renal replacement therapy in patients with stage 3 acute kidney injury (P = .17). Of liver transplant recipients who present with acute kidney injury, 19% require renal replacement therapy, and in-hospital mortality is 20% in the early postoperative period.
Town Stems Major Water Losses With New Lines and Storage Tank
With the help of EPA funding, the Town of Chapmanville in Logan County, WV, has a new drinking water storage tank and distribution lines to replace a system built in the late 1940s that was “leaking like a sieve” and posed a risk to public health.
77 FR 50054 - Airworthiness Directives; Cessna Aircraft Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-20
... rubbing against the right steering tube assembly during full rudder pedal actuation. This proposed AD would require you to inspect the fuel return line assembly for chafing; replace the fuel return line... right steering tube assembly and the airplane structure; and adjustment as necessary. We are proposing...
International Space Station (ISS) Orbital Replaceable Unit (ORU) Wet Storage Risk Assessment
NASA Technical Reports Server (NTRS)
Squire, Michael D.; Rotter, Henry A.; Lee, Jason; Packham, Nigel; Brady, Timothy K.; Kelly, Robert; Ott, C. Mark
2014-01-01
The International Space Station (ISS) Program requested the NASA Engineering and Safety Center (NESC) to evaluate the risks posed by the practice of long-term wet storage of ISS Environmental Control and Life Support (ECLS) regeneration system orbital replacement units (ORUs). The ISS ECLS regeneration system removes water from urine and humidity condensate and converts it into potable water and oxygen. A total of 29 ORUs are in the ECLS system, each designed to be replaced by the ISS crew when necessary. The NESC assembled a team to review the ISS ECLS regeneration system and evaluate the potential for biofouling and corrosion. This document contains the outcome of the evaluation.
Core Vessel Insert Handling Robot for the Spallation Neutron Source
DOE Office of Scientific and Technical Information (OSTI.GOV)
Graves, Van B; Dayton, Michael J
2011-01-01
The Spallation Neutron Source provides the world's most intense pulsed neutron beams for scientific research and industrial development. Its eighteen neutron beam lines will eventually support up to twenty-four simultaneous experiments. Each beam line consists of various optical components which guide the neutrons to a particular instrument. The optical components nearest the neutron moderators are the core vessel inserts. Located approximately 9 m below the high bay floor, these inserts are bolted to the core vessel chamber and are part of the vacuum boundary. They are in a highly radioactive environment and must periodically be replaced. During initial SNS construction,more » four of the beam lines received Core Vessel Insert plugs rather than functional inserts. Remote replacement of the first Core Vessel Insert plug was recently completed using several pieces of custom-designed tooling, including a highly complicated Core Vessel Insert Robot. The design of this tool are discussed.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-27
... lawfulness of the rates charged by the Respondent for transportation of jet or aviation turbine fuel on its..., Inc., Continental Airlines, Inc., JetBlue Airways Corporation, United Air Lines, Inc., US Airways, Inc... Airlines, Inc., JetBlue Airways Corporation, United Air Lines, Inc., and US Airways, Inc. (collectively...
Stritesky, Gretta; Wadsworth, Kimberly; Duffy, Merry; Buck, Kelly; Dehn, Jason
2018-02-01
Umbilical cord blood units provide an important stem cell source for transplantation, particularly for patients of ethnic diversity who may not have suitably matched available, adult-unrelated donors. However, with the cost of cord blood unit acquisition from public banks significantly higher than that for adult-unrelated donors, attention is focused on decreasing cost yet still providing cord blood units to patients in need. Historical practices of banking units with low total nucleated cell counts, including units with approximately 90 × 10 7 total nucleated cells, indicates that most banked cord blood units have much lower total nucleated cell counts than are required for transplant. The objective of this study was to determine the impact on the ability to identify suitable cord blood units for transplantation if the minimum total nucleated cell count for banking were increased from 90 × 10 7 to 124 or 149 × 10 7 . We analyzed ethnically diverse patients (median age, 3 years) who underwent transplantation of a single cord blood unit in 2005 to 2016. A cord blood unit search was evaluated to identify units with equal or greater human leukocyte antigen matching and a greater total nucleated cell count than that of the transplanted cord blood unit (the replacement cord blood unit). If the minimum total nucleated cell count for banking increased to 124 or 149 × 10 7 , then from 75 to 80% of patients would still have at least 1 replacement cord blood unit in the current (2016) cord blood unit inventory. The best replacement cord blood units were often found among cords with the same ethnic background as the patient. The current data suggest that, if the minimum total nucleated cell count were increased for banking, then it would likely lead to an inventory of more desirable cord blood units while having minimal impact on the identification of suitable cord blood units for transplantation. © 2017 AABB.
77 FR 12448 - Airworthiness Directives; Pratt & Whitney Division Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-01
... Delta Airlines, Inc. requested that we specify replacing affected FMUs with FMU P/N 53U044, or later FAA... actual cost of the AD; not other costs. We did not change the AD. Request To Replace FMUs On-Wing United Parcel Service Co. requested that we include in the AD the option to perform on-wing replacements of...
Energy content in dried leaf litter of some oaks and mixed mesophytic species that replace oaks
Aaron D. Stottlemeyer; G. Geoff Wang; Patrick H. Brose; Thomas A. Waldrop
2010-01-01
Mixed-mesophytic hardwood tree species are replacing upland oaks in vast areas of the Eastern United States deciduous forest. Some researchers have suggested that the leaf litter of mixed-mesophytic, oak replacement species renders forests less flammable where forest managers wish to restore a natural fire regime. We performed chemical analyses on dried leaf litter...
Prevalence of Total Hip and Knee Replacement in the United States.
Maradit Kremers, Hilal; Larson, Dirk R; Crowson, Cynthia S; Kremers, Walter K; Washington, Raynard E; Steiner, Claudia A; Jiranek, William A; Berry, Daniel J
2015-09-02
Descriptive epidemiology of total joint replacement procedures is limited to annual procedure volumes (incidence). The prevalence of the growing number of individuals living with a total hip or total knee replacement is currently unknown. Our objective was to estimate the prevalence of total hip and total knee replacement in the United States. Prevalence was estimated using the counting method by combining historical incidence data from the National Hospital Discharge Survey and the Healthcare Cost and Utilization Project (HCUP) State Inpatient Databases from 1969 to 2010 with general population census and mortality counts. We accounted for relative differences in mortality rates between those who have had total hip or knee replacement and the general population. The 2010 prevalence of total hip and total knee replacement in the total U.S. population was 0.83% and 1.52%, respectively. Prevalence was higher among women than among men and increased with age, reaching 5.26% for total hip replacement and 10.38% for total knee replacement at eighty years. These estimates corresponded to 2.5 million individuals (1.4 million women and 1.1 million men) with total hip replacement and 4.7 million individuals (3.0 million women and 1.7 million men) with total knee replacement in 2010. Secular trends indicated a substantial rise in prevalence over time and a shift to younger ages. Around 7 million Americans are living with a hip or knee replacement, and consequently, in most cases, are mobile, despite advanced arthritis. These numbers underscore the substantial public health impact of total hip and knee arthroplasties. Copyright © 2015 by The Journal of Bone and Joint Surgery, Incorporated.
Exploring Media Richness Using Different Communication Channels within a Hybrid Presentation Style
ERIC Educational Resources Information Center
Buzydlowski, Jan W.
2015-01-01
Some traditional face-to-face teaching is being replaced with on-line methodologies. While there are advantages to this replacement, there are certainly drawbacks to it as well. A teaching environment that combines both, however, a hybrid classroom, gains the best of both worlds. There should be a reason why hybrids are used and courses should be…
NASA Astrophysics Data System (ADS)
Ayres, R.; Miller, S.
1982-06-01
The characteristics, applications, and operational capabilities of currently available robots are examined. Designed to function at tasks of a repetitive, hazardous, or uncreative nature, robot appendages are controlled by microprocessors which permit some simple decision-making on-the-job, and have served for sample gathering on the Mars Viking lander. Critical developmental areas concern active sensors at the robot grappler-object interface, where sufficient data must be gathered for the central processor to which the robot is attached to conclude the state of completion and suitability of the workpiece. Although present robots must be programmed through every step of a particular industrial process, thus limiting each robot to specialized tasks, the potential for closed cells of batch-processing robot-run units is noted to be close to realization. Finally, consideration is given to methods for retraining the human workforce that robots replace
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1980-01-01
The latest technical and programmatic developments are considered as well as expansions of the Rockwell SPS cost model covering each phase of the program through the year 2030. Comparative cost/economic analyses cover elements of the satellite, construction system, space transportation vehicles and operations, and the ground receiving station. System plans to define time phased costs and planning requirements that support major milestones through the year 2000. A special analysis is included on natural resources required to build the SPS reference configuration. An appendix contains the SPS Work Breakdown Structure and dictionary along with detail cost data sheet on each system and main element of the program. Over 200 line items address DDT&E, theoretical first unit, investment cost per satellite, and operations charges for replacement capital and normal operations and maintenance costs.
NASA Astrophysics Data System (ADS)
Wasko, Frank
Traditionally, electric utilities have been slow to change and very bureaucratic in nature. This culture, in and of itself, has now contributed to a high percentage of United States electric utilities operating uneconomical nuclear plants (Crooks, 2014). The economic picture behind owning and operating United States nuclear plants is less than favorable for many reasons including rising fuel, capital and operating costs (EUCG, 2012). This doctoral dissertation is specifically focused on life without nuclear power. The purpose of this dissertation is to create a model and guide that will provide electric utilities who currently operate or will operate uneconomical nuclear plants the opportunity to economically assess whether or not their nuclear plant should be retired. This economic assessment and stakeholder analysis will provide local government, academia and communities the opportunity to understand how Southern California Edison (SCE) embraced system upgrade import and "voltage support" opportunities to replace "base load" generation from San Onofre Nuclear Generating Station (SONGS) versus building new replacement generation facilities. This model and guide will help eliminate the need to build large replacement generation units as demonstrated in the SONGS case analysis. The application of The Nuclear Power Retirement Model and Guide will provide electric utilities with economic assessment parameters and an evaluation assessment progression needed to better evaluate when an uneconomical nuclear plant should be retired. It will provide electric utilities the opportunity to utilize sound policy, planning and development skill sets when making this difficult decision. There are currently 62 nuclear power plants (with 100 nuclear reactors) operating in the United States (EIA, 2014). From this group, 38 are at risk of early retirement based on the work of Cooper (2013). As demonstrated in my model, 35 of the 38 nuclear power plants qualify to move to the economic assessment review and then on to the stakeholder cost benefit analysis (if model qualifications are met) leading to a final plant retirement decision. This application via the model and guide, in turn, will lead electric utilities to explore system upgrade import opportunities and mitigation measures versus building new replacement generation facilities. United States nuclear reactors are licensed for 40 years with a 20 year extension available prior to the expiration date (EIA, 2013). Since late 2012, electric power companies have announced the early retirement of four uneconomical nuclear power plants while other studies have indicated that as many as 70 percent of United States nuclear power plants are potentially at risk for early retirement (Crooks, 2014 and Cooper, 2013). A high percentage of these aforementioned nuclear plants have operating licenses that will not expire until 2030 and beyond. Thus, for the most part, replacement power contingency planning has not been initiated for these plants or is still in preliminary stages. The recent nuclear plant retirements are the first since 1998 (EIA, 2013). Decisions to retire the plants involved concerns over maintenance and repair costs as well as declining profitability (EIA, 2013). In addition, the Energy Information Administration (2010-2012) released data that demonstrated that the worst 25 percent of United States nuclear plants are far more expensive to operate and generate electricity than new gas plants. It is equally important to understand and explain the economic and power replacement implications to both ratepayers and end-users. A SONGS case study analysis will review the economic, operational and political challenges that SCE faced leading to the retirement decision of SONGS. As preface to the case study, replacement steam generators (RSGs) were installed in Unit 2 in 2009 and in Unit 3 in 2010. In January 2012, while Unit 2 was down for routine maintenance, a small leak was discovered inside a steam generator in Unit 3. Because of the situation, both units remained shut down to evaluate the cause of the leakage and to make repairs. SCE submitted plans to the Nuclear Regulatory Commission (NRC) to re-start Unit 2 at reduced power. However, concerns over the length of the review process and the high costs associated with steam generator repairs led SCE to retire both reactors (SCE SONGS Fact Sheets, 2012-2013). Finally, collaborative resource power replacement planning is needed more than ever as nuclear facilities in the United States are now being retired for economic related reasons (Crooks, 2014). This collaborative power replacement process and implementation must encompass all relevant stakeholders including state grid operators, ratepayers, shareholders and the electric utility company.
NASA Technical Reports Server (NTRS)
Steele, John; Chullen, Cinda; Morenz, Jesse; Stephenson, Curtis
2010-01-01
Freon-113(TradeMark) has been used as a chemistry lab sampling solvent at NASA/JSC for EMU (extravehicular Mobility Unit) SOP (Secondary Oxygen Pack) oxygen testing Cold Traps utilized at the USA (United Space Alliance) Houston facility. Similar testing has occurred at the HSWL (Hamilton Sundstrand Windsor Locks) facility. A NASA Executive Order bans the procurement of all ODS (ozone depleting substances), including Freon-113 by the end of 2009. In order to comply with NASA direction, HSWL began evaluating viable solvents to replace Freon-113 . The study and testing effort to find Freon-113 replacements used for Cold Trap sampling is the subject of this paper. Test results have shown HFE-7100 (a 3M fluorinated ether) to be an adequate replacement for Freon-113 as a solvent to remove and measure the non-volatile residue collected in a Cold Trap during oxygen testing. Furthermore, S-316 (a Horiba Instruments Inc. high molecular weight, non-ODS chlorofluorocarbon) was found to be an adequate replacement for Freon-113 as a solvent to reconstitute non-volatile residue removed from a Cold Trap during oxygen testing for subsequent HC (hydrocarbon) analysis via FTIR (Fourier Transform Infrared Spectroscopy).
Quality in Higher Education: Perspectives from Front-Line Faculty in the United States
ERIC Educational Resources Information Center
Hall, Molly Reas
2015-01-01
The purpose of this study was to explore perceptions of front-line faculty members in the United States related to quality and quality management in higher education. The study's three research questions were: (1) How do front-line faculty members in the United States define quality in higher education? (2) How do front-line faculty members in the…
NASA Technical Reports Server (NTRS)
Monford, L. G., Jr. (Inventor)
1974-01-01
A digital communication system is reported for parallel operation of 16 or more transceiver units with the use of only four interconnecting wires. A remote synchronization circuit produces unit address control words sequentially in data frames of 16 words. Means are provided in each transceiver unit to decode calling signals and to transmit calling and data signals. The transceivers communicate with each other over one data line. The synchronization unit communicates the address control information to the transceiver units over an address line and further provides the timing information over a clock line. A reference voltage level or ground line completes the interconnecting four wire hookup.
Massively parallel algorithms for trace-driven cache simulations
NASA Technical Reports Server (NTRS)
Nicol, David M.; Greenberg, Albert G.; Lubachevsky, Boris D.
1991-01-01
Trace driven cache simulation is central to computer design. A trace is a very long sequence of reference lines from main memory. At the t(exp th) instant, reference x sub t is hashed into a set of cache locations, the contents of which are then compared with x sub t. If at the t sup th instant x sub t is not present in the cache, then it is said to be a miss, and is loaded into the cache set, possibly forcing the replacement of some other memory line, and making x sub t present for the (t+1) sup st instant. The problem of parallel simulation of a subtrace of N references directed to a C line cache set is considered, with the aim of determining which references are misses and related statistics. A simulation method is presented for the Least Recently Used (LRU) policy, which regradless of the set size C runs in time O(log N) using N processors on the exclusive read, exclusive write (EREW) parallel model. A simpler LRU simulation algorithm is given that runs in O(C log N) time using N/log N processors. Timings are presented of the second algorithm's implementation on the MasPar MP-1, a machine with 16384 processors. A broad class of reference based line replacement policies are considered, which includes LRU as well as the Least Frequently Used and Random replacement policies. A simulation method is presented for any such policy that on any trace of length N directed to a C line set runs in the O(C log N) time with high probability using N processors on the EREW model. The algorithms are simple, have very little space overhead, and are well suited for SIMD implementation.
Architecture-Based Unit Testing of the Flight Software Product Line
NASA Technical Reports Server (NTRS)
Ganesan, Dharmalingam; Lindvall, Mikael; McComas, David; Bartholomew, Maureen; Slegel, Steve; Medina, Barbara
2010-01-01
This paper presents an analysis of the unit testing approach developed and used by the Core Flight Software (CFS) product line team at the NASA GSFC. The goal of the analysis is to understand, review, and reconunend strategies for improving the existing unit testing infrastructure as well as to capture lessons learned and best practices that can be used by other product line teams for their unit testing. The CFS unit testing framework is designed and implemented as a set of variation points, and thus testing support is built into the product line architecture. The analysis found that the CFS unit testing approach has many practical and good solutions that are worth considering when deciding how to design the testing architecture for a product line, which are documented in this paper along with some suggested innprovennents.
Spline screw payload fastening system
NASA Technical Reports Server (NTRS)
Vranish, John M. (Inventor)
1993-01-01
A system for coupling an orbital replacement unit (ORU) to a space station structure via the actions of a robot and/or astronaut is described. This system provides mechanical and electrical connections both between the ORU and the space station structure and between the ORU and the ORU and the robot/astronaut hand tool. Alignment and timing features ensure safe, sure handling and precision coupling. This includes a first female type spline connector selectively located on the space station structure, a male type spline connector positioned on the orbital replacement unit so as to mate with and connect to the first female type spline connector, and a second female type spline connector located on the orbital replacement unit. A compliant drive rod interconnects the second female type spline connector and the male type spline connector. A robotic special end effector is used for mating with and driving the second female type spline connector. Also included are alignment tabs exteriorally located on the orbital replacement unit for berthing with the space station structure. The first and second female type spline connectors each include a threaded bolt member having a captured nut member located thereon which can translate up and down the bolt but are constrained from rotation thereabout, the nut member having a mounting surface with at least one first type electrical connector located on the mounting surface for translating with the nut member. At least one complementary second type electrical connector on the orbital replacement unit mates with at least one first type electrical connector on the mounting surface of the nut member. When the driver on the robotic end effector mates with the second female type spline connector and rotates, the male type spline connector and the first female type spline connector lock together, the driver and the second female type spline connector lock together, and the nut members translate up the threaded bolt members carrying the first type electrical connector up to the complementary second type connector for interconnection therewith.
Li, Yihan; Wojcik, Roza; Dovichi, Norman J.
2010-01-01
We describe a two-dimensional capillary electrophoresis system that incorporates a replaceable enzymatic microreactor for on-line protein digestion. In this system, trypsin is immobilized on magnetic beads. At the start of each experiment, old beads are flushed to waste and replaced with a fresh plug of beads, which is captured by a pair of magnets at the distal tip of the first capillary. For analysis, proteins are separated in the first capillary. A fraction is then parked in the reactor to create peptides. Digested peptides are periodically transferred to the second capillary for separation; a fresh protein fraction is simultaneously moved to the reactor for digestion. An electrospray interface is used to introduce peptides into a mass spectrometer for analysis. This procedure is repeated for several dozen fractions under computer control. The system was demonstrated by the separation and digestion of insulin chain b oxidized and β-casein as model proteins. PMID:21030030
Impact of water quality change on corrosion scales in full and partially replaced lead service lines
BackgroundChanges in water qualities have been associated with an increase in lead release from full and partial lead service lines (LSLs), such as the cases of Washington D.C. or more recently of Flint (Mi). Water qualities affect the mineralogy of the scales. Furthermore, follo...
NASA Astrophysics Data System (ADS)
Ullah, Rahat; Liu, Bo; Zhang, Qi; Tian, Qinghua; Tian, Feng; Qu, Zhaowei; Yan, Cheng; Khan, Muhammad Saad; Ahmad, Ibrar; Xin, Xiangjun
2015-11-01
We propose a technique for the generation of optical frequency comb from a single source, which reduces the costs of optical access networks. Two Mach-Zehnder modulators are cascaded with one phase modulator driven by radiofrequency signals. With 10-GHz frequency spacing, the generated 40 optical multicarriers have good tone-to-noise ratio with least excursions in their comb lines. The laser array at the optical line terminal of the conventional wavelength division multiplexed passive optical network (WDM-PON) system has been replaced with optical frequency comb generator (OFCG), which may result in cost-effective optical line terminal (OLT) supporting a large-capacity WDM-PON system. Of 40 carriers generated, each carrier carries 10 Gbps data based on differential phase-shift keying. Four hundred Gbps multiplexed data from all channels are successfully transmitted through a fiber span of 25 km with negligible power penalties. Part of the downlink signal is used in uplink transmission at optical network unit where intensity-modulated on-off keying is deployed for remodulation. Theoretical analysis of the proposed WDM-PON system based on OFCG are in good agreement with simulation results. The metrics considered for the analysis of the proposed OFCG in a WDM-PON system are power penalties of the full-duplex transmission, eye diagrams, and bit error rate.
NASA Technical Reports Server (NTRS)
Parsons, Vickie S.
2009-01-01
A request to conduct a peer review of the International Space Station (ISS) proposal to use Bayesian methodology for updating Mean Time Between Failure (MTBF) for ISS Orbital Replaceable Units (ORU) was submitted to the NASA Engineering and Safety Center (NESC) on September 20, 2005. The results were requested by October 20, 2005 in order to be available during the process of reworking the current ISS flight manifest. The results are included in this report.
NASA Technical Reports Server (NTRS)
Chobotov, V. A.
1974-01-01
Control elements such as sensors, momentum exchange devices, and thrusters are described which can be used to define space replaceable units (SRU), in accordance with attitude control, guidance, and navigation performance requirements selected for NASA space serviceable mission spacecraft. A number of SRU's are developed, and their reliability block diagrams are presented. An SRU assignment is given in order to define a set of feasible space serviceable spacecraft for the missions of interest.
44 CFR 62.20 - Claims appeals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (includes contractors' estimates), detailing unit cost and quantities for the items needing repair or replacement; replacement cost proofs of loss; Preliminary Report; Final Report; detailed damaged personal... wind policies and any claim information submitted to the other companies; Waiver, Letter of Map...
44 CFR 62.20 - Claims appeals.
Code of Federal Regulations, 2011 CFR
2011-10-01
... (includes contractors' estimates), detailing unit cost and quantities for the items needing repair or replacement; replacement cost proofs of loss; Preliminary Report; Final Report; detailed damaged personal... wind policies and any claim information submitted to the other companies; Waiver, Letter of Map...
Structural changes in endometrial basal glands during menstruation.
Garry, R; Hart, R; Karthigasu, K A; Burke, C
2010-09-01
To prospectively observe the changes occurring in endometrial glandular morphology during menstrual shedding and regeneration. Prospective observational study. The academic gynaecological endoscopy unit of a university teaching hospital. Population Thirteen patients investigated for a variety of benign, non-infective gynaecological disorders during the active bleeding phase of the menstrual cycle. The morphological appearances of concurrent histological and scanning electron microscopic images of endometrium taken at different stages of the active bleeding phase of menstruation were studied and correlated with the simultaneous immunohistochemical expression of the Ki-67 proliferation marker and the CD68 marker of macrophage activity. Change in morphology of endometrial glands at various stages of menstruation. Endometrial glands within the basalis show evidence of apoptosis and associated macrophage activity immediately before and during menstruation. There is subsequent destruction and removal of old secretory glandular epithelial elements, and rapid replacement with new narrow glands lined with small epithelial cells. There is no evidence of mitotic cell division or expression of Ki-67 in the glandular cells during this replacement process, but there is evidence of marked macrophage activity prior to glandular cell loss. Early endometrial epithelial repair after menstruation is not a consequence of mitotic cell division. It occurs without evidence of Ki-67 expression. There is structural evidence of programmed cell death and intense macrophage activity associated with glandular remodelling. Dead epithelial cells are shed from the glands and accumulate within the endometrial cavity to be replaced by new small epithelial cells that appear to arise by differentiation of the surrounding stromal cells. We propose that these stromal cells are endometrial progenitor/stem cells.
Repair Types, Procedures - Part 2
2010-05-01
completely severed or severely damaged fuel lines, cut away the damaged section and use a piece of fuel- resistant rubber hose with an inner diameter...equal to the existing fuel line outer diameter to replace the damaged section. Ensure the repair hose extends far enough on each side of the damage to...accommodate two hose clamps, oriented 180° from one another. Flare the ends of the existing fuel line to improve the seal and prevent leakage
Burbank performs the WHC Yearly Maintenance in the Node 3
2012-01-11
ISS030-E-032750 (11 Jan. 2012) --- NASA astronaut Dan Burbank, Expedition 30 flight commander, performs the Waste and Hygiene Compartment (WHC) yearly maintenance in the Tranquility node of the International Space Station. The maintenance included removing and replacing the urine hydraulic components which include urine lines, urine valve block and urine pressure sensors, and removing and replacing the Flush Water Tank Pressure Sensor.
Evaluation of SRB phenolic TPS material made by an alternate vendor
NASA Technical Reports Server (NTRS)
Karu, Z. S.
1982-01-01
Tests conducted to evaluate the adequacy of solid rocket booster (SRB) phenolic thermal protection system (TPS) material supplied by an alternate vendor chosen by United Space Boosters, Inc. (USBI), to replace the current phenolic TPS sections used thus far on the first four Shuttle flights. The phenolic TPS is applied mainly to the attach and kick rings of the solid rocket booster (SRB). Full-scale sectional models of both the attach and kick ring structure were made up with 0.0265 in. thick stainless steel thin skin covers with thermocouples on them to determine the heating rates. Such models were made up for both the forward and rear faces of the kick ring which has a different configuration on each side. The thin skins were replaced with the alternate phenolic TPS sections cut from flight hardware configuration phenolic parts as supplied by the new vendor. Two tests were performed for each configuration of the attach and kick rings and the samples were exposed to the flow for a duration that gave a heat load equivalent to that obtained in the series of runs made for the current line of phenolic TPS. The samples performed very well with no loss of any phenolic layers. The post-test samples looked better than those used to verify the current phenolic TPS.
METHOD AND APPARATUS FOR THE DETECTION OF LEAKS IN PIPE LINES
Jefferson, S.; Cameron, J.F.
1961-11-28
A method is described for detecting leaks in pipe lines carrying fluid. The steps include the following: injecting a radioactive solution into a fluid flowing in the line; flushing the line clear of the radioactive solution; introducing a detector-recorder unit, comprising a radioactivity radiation detector and a recorder which records the detector signal over a time period at a substantially constant speed, into the line in association with a go-devil capable of propelling the detector-recorder unit through the line in the direction of the fluid flow at a substantia1ly constant velocity; placing a series of sources of radioactivity at predetermined distances along the downstream part of the line to make a characteristic signal on the recorder record at intervals corresponding to the location of said sources; recovering the detector-recorder unit at a downstream point along the line; transcribing the recorder record of any radioactivity detected during the travel of the detector- recorder unit in terms of distance along the line. (AEC)
2010-07-21
ISS024-E-009246 (21 July 2010) --- NASA astronaut Tracy Caldwell Dyson, Expedition 24 flight engineer, is pictured during troubleshooting operations of the Oxygen Generator System (OGS) hardware and replacement of an H2 (hydrogen) Dome Orbit Replaceable Unit (ORU) in the Destiny laboratory of the International Space Station.
Computer-generated scenes depicting the HST capture and EVA repair mission
1993-11-12
Computer generated scenes depicting the Hubble Space Telescope capture and a sequence of planned events on the planned extravehicular activity (EVA). Scenes include the Remote Manipulator System (RMS) arm assisting two astronauts changing out the Wide Field/Planetary Camera (WF/PC) (48699); RMS arm assisting in the temporary mating of the orbiting telescope to the flight support system in Endeavour's cargo bay (48700); Endeavour's RMS arm assisting in the "capture" of the orbiting telescope (48701); Two astronauts changing out the telescope's coprocessor (48702); RMS arm assistign two astronauts replacing one of the telescope's electronic control units (48703); RMS assisting two astronauts replacing the fuse plugs on the telescope's Power Distribution Unit (PDU) (48704); The telescope's High Resolution Spectrograph (HRS) kit is depicted in this scene (48705); Two astronauts during the removal of the high speed photometer and the installation of the COSTAR instrument (48706); Two astronauts, standing on the RMS, during installation of one of the Magnetic Sensing System (MSS) (48707); High angle view of the orbiting Space Shuttle Endeavour with its cargo bay doors open, revealing the bay's pre-capture configuration. Seen are, from the left, the Solar Array Carrier, the ORU Carrier and the flight support system (48708); Two astronauts performing the replacement of HST's Rate Sensor Units (RSU) (48709); The RMS arm assisting two astronauts with the replacement of the telescope's solar array panels (48710); Two astronauts replacing the telescope's Solar Array Drive Electronics (SADE) (48711).
Replacement solvents for use in chemical synthesis
Molnar, Linda K.; Hatton, T. Alan; Buchwald, Stephen L.
2001-05-15
Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.
Poveda Andrés, J L; García Gómez, C; Hernández Sansalvador, M; Valladolid Walsh, A
2003-01-01
To determine monetary impact when traditional drug floor stocks are replaced by Automated Drug Dispensing Systems (ADDS) in the Medical Intensive Care Unit, Surgical Intensive Care Unit and the Emergency Room. We analysed four different flows considered to be determinant when implementing ADDS in a hospital environment: capital investment, staff costs, inventory costs and costs related to drug use policies. Costs were estimated by calculation of the current net value. Its analysis shows that those expenses derived from initial investment are compensated by the three remaining flows, with costs related to drug use policies showing the most substantial savings. Five years after initial investment, global cash-flows have been estimated at 300.525 euros. Replacement of traditional floor stocks by ADDS in the Medical Intensive Care Unit, Surgery Intensive Care Unit and the Emergency Room produces a positive benefit/cost ratio (1.95).
77 FR 38468 - Airworthiness Directives; Bombardier, Inc. Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-28
... was prompted by a report of a ground fire which was fed by oxygen escaping from a damaged third crew person oxygen line and had started in the vicinity of an electrical panel. This AD requires replacing and changing the routing of the flexible oxygen hose of the third crew person oxygen line and modifying the...
Feasibility of flywheel energy storage systems for applications in future space missions
NASA Technical Reports Server (NTRS)
Santo, G. Espiritu; Gill, S. P.; Kotas, J. F.; Paschall, R.
1995-01-01
The objective of this study was to examine the overall feasibility of deploying electromechanical flywheel systems in space used for excess energy storage. Results of previous Rocketdyne studies have shown that the flywheel concept has a number of advantages over the NiH2 battery, including higher specific energy, longer life and high roundtrip efficiency. Based on this prior work, this current study was broken into four subtasks. The first subtask investigated the feasibility of replacing the NiH2 battery orbital replacement unit (ORU) on the international space station (ISSA) with a flywheel ORU. In addition, a conceptual design of a generic flywheel demonstrator experiment implemented on the ISSA was completed. An assessment of the life cycle cost benefits of replacing the station battery energy storage ORU's with flywheel ORU's was performed. A fourth task generated a top-level development plan for critical flywheel technologies, the flywheel demonstrator experiments and its evolution into the production unit flywheel replacement ORU.
77 FR 55159 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... oxygen mask stowage box units; and replacement of the crew oxygen mask stowage box unit with a new crew oxygen mask stowage unit, if necessary. That NPRM was prompted by reports indicating that certain crew oxygen mask stowage box units were possibly delivered with a burr in the inlet fitting. The burr might...
SMALL DIAMETER CEMENT LINING FROM STAIRWAY. United States Pipe ...
SMALL DIAMETER CEMENT LINING FROM STAIRWAY. - United States Pipe & Foundry Company Plant, Coating, Painting, Lining & Packaging Building, 2023 St. Louis Avenue at I-20/59, Bessemer, Jefferson County, AL
Singh, Paramveer; Idowu, Olakunle; Malik, Imrana; Nates, Joseph L
2015-10-01
Magnesium is known to act at the neuromuscular junction by inhibiting the presynaptic release of acetylcholine and desensitizing the postsynaptic membrane. Because of these effects, magnesium has been postulated to potentiate neuromuscular weakness. We describe the case of a 62-year-old woman with myasthenia gravis and a metastatic thymoma who was admitted to our intensive care unit for management of a myasthenic crisis. The patient's neuromuscular weakness worsened in association with standard intravenous magnesium replacement, and the exacerbated respiratory failure necessitated intubation, mechanical ventilation, and an extended stay in the intensive care unit. The effect of magnesium replacement on myasthenia gravis patients has not been well documented, and we present this case to increase awareness and stimulate research. In addition, we discuss the relevant medical literature.
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier, for the Hubble Space Telescope is unwrapped and awaits final processing for launch. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2011-05-03
CAPE CANAVERAL, Fla. -- At the NASA Shuttle Logistics Depot in Cape Canaveral, Florida, technicians remove the cover on the Load Control Assembly-2 (LCA-2) to begin the testing process. Located in space shuttle Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. The LCA-2 will be replaced and systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett
2011-05-03
CAPE CANAVERAL, Fla. -- At the NASA Shuttle Logistics Depot in Cape Canaveral, Florida, technicians begin the testing process on the Load Control Assembly-2 (LCA-2) after the cover has been removed. Located in space shuttle Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. The LCA-2 will be replaced and systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett
2011-05-03
CAPE CANAVERAL, Fla. -- At the NASA Shuttle Logistics Depot in Cape Canaveral, Florida, the Load Control Assembly-2 (LCA-2) is uncovered for testing. Located in space shuttle Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. The LCA-2 will be replaced and systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett
2011-05-04
CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A, the access door is open on space shuttle Endeavour for technicians to enter the aft area where the Load Control Assembly-2 (LCA-2) is located. Located in Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission and has been replaced. Systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Troy Cryder
2011-05-03
CAPE CANAVERAL, Fla. -- At the NASA Shuttle Logistics Depot in Cape Canaveral, Florida, the Load Control Assembly-2 (LCA-2) is uncovered for testing. Located in space shuttle Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. The LCA-2 will be replaced and systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett
2011-05-03
CAPE CANAVERAL, Fla. -- At the NASA Shuttle Logistics Depot in Cape Canaveral, Florida, the Load Control Assembly-2 (LCA-2) is uncovered for testing. Located in space shuttle Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. The LCA-2 will be replaced and systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett
2011-05-03
CAPE CANAVERAL, Fla. -- At the NASA Shuttle Logistics Depot in Cape Canaveral, Florida, technicians begin the testing process on the Load Control Assembly-2 (LCA-2) after the cover has been removed. Located in space shuttle Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. The LCA-2 will be replaced and systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett
2011-05-03
CAPE CANAVERAL, Fla. -- At the NASA Shuttle Logistics Depot in Cape Canaveral, Florida, technicians remove the cover on the Load Control Assembly-2 (LCA-2) to begin the testing process. Located in space shuttle Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. The LCA-2 will be replaced and systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett
2011-05-03
CAPE CANAVERAL, Fla. -- At the NASA Shuttle Logistics Depot in Cape Canaveral, Florida, technicians begin the testing process on the Load Control Assembly-2 (LCA-2) after the cover has been removed. Located in space shuttle Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. The LCA-2 will be replaced and systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett
2011-05-03
CAPE CANAVERAL, Fla. -- At the NASA Shuttle Logistics Depot in Cape Canaveral, Florida, technicians carefully remove the Load Control Assembly-2 (LCA-2) from a cart for testing. Located in space shuttle Endeavour's aft avionics bay 5, the LCA-2, which distributes power to nine shuttle systems, is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. The LCA-2 will be replaced and systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett
Photonic elements in smart systems for use in aerospace platforms
NASA Astrophysics Data System (ADS)
Adamovsky, Grigory; Baumbick, Robert J.; Tabib-Azar, Massood
1998-07-01
To compete globally in the next millennium, designers of new transportation vehicles will have to be innovative. Keen competition will reward innovative concepts that are developed and proven first. In order to improve reliability of aerospace platforms and reduce operating cots, new technologies must be exploited to produce autonomous systems, based on highly distributed, smart systems, which can be treated as line replaceable units. These technologies include photonics, which provide sensing and information transfer functions, and micro electro mechanical systems that will produce the actuation and, in some cases, may even provide a computing capability that resembles the hydro- mechanical control system used in older aircraft systems. The combination of these technologies will provide unique systems that will enable achieving the reliability and cost goals dictated by global market. In the article we review some of these issues and discuss a role of photonics in smart system for aerospace platforms.
Hydrogen detection study. [for environmental control/life support systems
NASA Technical Reports Server (NTRS)
Shumar, J. W.; Powell, J. D.
1974-01-01
The effectiveness was assessed of a hydrogen (H2) detection concept for regenerative environmental control life support systems (EC/LSS). The concept evaluated was that utilized for the electrochemical depolarized concentrator (EDC) design, constructed, and tested for the EC/LSS space station prototype program. The EDC contains combustible gas detectors (CGDs) which were evaluated with H2. The CGDs were evaluated for linearity, position sensitivity, reproducibility, ambient effects, repeatability, speed of response, recovery time, and interchangeability. The effectiveness of CGDs located within the EDC for sensing H2 leaks at various line replaceable units in the subsystem was determined. The effects of H2 leak rate, H2 concentration of leaking gas and air currents in the vicinity of the EDC were determined. Proposed improvements for the H2 detection concept were documented and alternative H2 detection approaches were identified and analyzed.
Clemons, Nicholas J; Phillips, Wayne A; Lord, Reginald V
2013-01-01
Esophageal adenocarcinoma develops in response to severe gastroesophageal reflux disease through the precursor lesion Barrett esophagus, in which the normal squamous epithelium is replaced by a columnar lining. The incidence of esophageal adenocarcinoma in the United States has increased by over 600% in the past 40 years and the overall survival rate remains less than 20% in the community. This review highlights some of the signaling pathways for which there is some evidence of a role in the development of esophageal adenocarcinoma. An increasingly detailed understanding of the biology of this cancer has emerged recently, revealing that in addition to the well-recognized alterations in single genes such as p53, p16, APC, and telomerase, there are interactions between the components of the reflux fluid, the homeobox gene Cdx2, and the Wnt, Notch, and Hedgehog signaling pathways. PMID:23792587
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-03
... numbers of the crew oxygen mask stowage box units; and replacement of the crew oxygen mask stowage box unit with a new crew oxygen mask stowage unit, if necessary. This proposed AD results [[Page 67638
Hannibal, Matthew; Thomas, Derek J; Low, Jeffrey; Hsu, Ken Y; Zucherman, James
2007-10-01
This is a retrospective analysis of data that was collected prospectively from 2 concurrent FDA IDE lumbar arthroplasty clinical trials performed at a single center. To determine if there is a clinical difference between the 1-level ProDisc patients versus the 2-level ProDisc patients at a minimum of 2 years of follow-up. Marnay's work with ProDisc I prompted the U.S. Clinical Trials of the ProDisc II under the direction of the FDA. Disc replacement surgery in the United States has shown promising results for all types of prostheses up to 6 months. Marnay and colleagues showed that their results at 10 years were still promising, and they saw no significant difference between 1-level and multilevel disc replacements. The findings of Ipsen and colleagues suggest that multilevel arthroplasty cases may be less successful than disc replacement at a single level. Patients were part of the FDA clinical trial for the Prodisc II versus circumferential fusion study at a single institution. We identified 27 patients who received ProDisc at 1 level and 32 who received it at 2 levels with at least a 2-year follow-up, for a total of 59 patients. Unpaired t tests were performed on the mean results of Visual Analog Scale, Oswestry Disability Index, SF-36 Healthy Survey Physical Component Summary, and satisfaction using 10-cm line visual scale scores to determine a clinical difference if any between the 2 populations. While patients receiving ProDisc at 2 levels scored marginally lower in all evaluation indexes, score differences in each category were also found to hold no statistical significance. This study was unable to identify a statistically significant difference in outcome between 1- and 2-level ProDisc arthroplasty patients in a cohort from a single center. The equality of clinical effectiveness between 1- and 2-level ProDisc has yet to be determined.
Sheng, Kaixuan; Sun, Yiqing; Li, Chun; Yuan, Wenjing; Shi, Gaoquan
2012-01-01
The recent boom in multifunction portable electronic equipments requires the development of compact and miniaturized electronic circuits with high efficiencies, low costs and long lasting time. For the operation of most line-powered electronics, alternating current (ac) line-filters are used to attenuate the leftover ac ripples on direct current (dc) voltage busses. Today, aluminum electrolytic capacitors (AECs) are widely applied for this purpose. However, they are usually the largest components in electronic circuits. Replacing AECs by more compact capacitors will have an immense impact on future electronic devices. Here, we report a double-layer capacitor based on three-dimensional (3D) interpenetrating graphene electrodes fabricated by electrochemical reduction of graphene oxide (ErGO-DLC). At 120-hertz, the ErGO-DLC exhibited a phase angle of -84 degrees, a specific capacitance of 283 microfaradays per centimeter square and a resistor-capacitor (RC) time constant of 1.35 milliseconds, making it capable of replacing AECs for the application of 120-hertz filtering.
NASA Astrophysics Data System (ADS)
Sheng, Kaixuan; Sun, Yiqing; Li, Chun; Yuan, Wenjing; Shi, Gaoquan
2012-02-01
The recent boom in multifunction portable electronic equipments requires the development of compact and miniaturized electronic circuits with high efficiencies, low costs and long lasting time. For the operation of most line-powered electronics, alternating current (ac) line-filters are used to attenuate the leftover ac ripples on direct current (dc) voltage busses. Today, aluminum electrolytic capacitors (AECs) are widely applied for this purpose. However, they are usually the largest components in electronic circuits. Replacing AECs by more compact capacitors will have an immense impact on future electronic devices. Here, we report a double-layer capacitor based on three-dimensional (3D) interpenetrating graphene electrodes fabricated by electrochemical reduction of graphene oxide (ErGO-DLC). At 120-hertz, the ErGO-DLC exhibited a phase angle of -84 degrees, a specific capacitance of 283 microfaradays per centimeter square and a resistor-capacitor (RC) time constant of 1.35 milliseconds, making it capable of replacing AECs for the application of 120-hertz filtering.
Sheng, Kaixuan; Sun, Yiqing; Li, Chun; Yuan, Wenjing; Shi, Gaoquan
2012-01-01
The recent boom in multifunction portable electronic equipments requires the development of compact and miniaturized electronic circuits with high efficiencies, low costs and long lasting time. For the operation of most line-powered electronics, alternating current (ac) line-filters are used to attenuate the leftover ac ripples on direct current (dc) voltage busses. Today, aluminum electrolytic capacitors (AECs) are widely applied for this purpose. However, they are usually the largest components in electronic circuits. Replacing AECs by more compact capacitors will have an immense impact on future electronic devices. Here, we report a double-layer capacitor based on three-dimensional (3D) interpenetrating graphene electrodes fabricated by electrochemical reduction of graphene oxide (ErGO-DLC). At 120-hertz, the ErGO-DLC exhibited a phase angle of −84 degrees, a specific capacitance of 283 microfaradays per centimeter square and a resistor-capacitor (RC) time constant of 1.35 milliseconds, making it capable of replacing AECs for the application of 120-hertz filtering. PMID:22355759
SMALL DIAMETER PRECEMENT LINING FROM CATWALK ABOVE. United States ...
SMALL DIAMETER PRE-CEMENT LINING FROM CATWALK ABOVE. - United States Pipe & Foundry Company Plant, Coating, Painting, Lining & Packaging Building, 2023 St. Louis Avenue at I-20/59, Bessemer, Jefferson County, AL
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
...) aircraft on the West Coast of the United States. Under this proposal, a total of seven active-duty F/A-18C... one-for-one replacement. The aging FA-18C Hornet aircraft are expected to be replaced with F-35C..., Southwest; 619-532-2799. SUPPLEMENTARY INFORMATION: As a replacement for the Navy's aging F/A- 18C Hornet...
40 CFR Table 37 to Subpart Uuu of... - Requirements for Performance Tests for Bypass Lines
Code of Federal Regulations, 2012 CFR
2012-07-01
... Bypass Lines 37 Table 37 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION... Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 37 Table 37 to Subpart UUU of Part 63—Requirements for Performance Tests for Bypass Lines As...
40 CFR Table 37 to Subpart Uuu of... - Requirements for Performance Tests for Bypass Lines
Code of Federal Regulations, 2014 CFR
2014-07-01
... Bypass Lines 37 Table 37 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION... Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 37 Table 37 to Subpart UUU of Part 63—Requirements for Performance Tests for Bypass Lines As...
40 CFR Table 37 to Subpart Uuu of... - Requirements for Performance Tests for Bypass Lines
Code of Federal Regulations, 2013 CFR
2013-07-01
... Bypass Lines 37 Table 37 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION... Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 37 Table 37 to Subpart UUU of Part 63—Requirements for Performance Tests for Bypass Lines As...
Development of a Tissue Engineered Scaffold for Meniscus Replacement
2008-12-01
include loss of manpower, rehabilitation costs, waste of training time/ money , cost to retrain members as replacements, hospitalization costs, disability...injuries in the United States Armed Forces. Mil Med, 1999. 164(8 Suppl): p. 633 pages. Lauder , T.D., et al., Sports and physical training injury
FINDING SOLVENT REPLACEMENTS TO REDUCE THE POTENTIAL ENVIRONMENTAL IMPACT OF INDUSTRIAL WASTES
The United States Environmental Protection Agency has developed a solvent substitution software tool PARIS II (Program for Assisting the Replacement of Industrial Solvents, version 2.0). The purpose of this tool is to find less toxic solvents or solvent mixtures which may functi...
Optical Sensor of Thermal Gas Flow Based on Fiber Bragg Grating.
Jiang, Xu; Wang, Keda; Li, Junqing; Zhan, Hui; Song, Zhenan; Che, Guohang; Lyu, Guohui
2017-02-15
This paper aims at solving the problem of explosion proof in measurement of thermal gas flow using electronic sensor by presenting a new type of flow sensor by optical fiber heating. A measuring unit based on fiber Bragg grating (FBG) for fluid temperature and a unit for heat dissipation are designed to replace the traditional electronic sensors. The light in C band from the amplified spontaneous emission (ASE) light source is split, with one part used to heat the absorbing coating and the other part used in the signal processing unit. In the heating unit, an absorbing coating is introduced to replace the traditional resistance heating module to minimize the risk of explosion. The measurement results demonstrate a fine consistency between the flow and temperature difference in simulation. The method to enhance the measurement resolution of flow is also discussed.
1980-12-01
distributions of Figs. 3 and 4 may be fitted quit, accurately by broken straight lines. If we had plotted the differential distributions directly...collection process. These fluctuations are smoothed by replacing the actual differential distribution by the derivative of the fitted broken-line lognormal...for each interval T. The constants in the distribution for each broken section of the lognormal approximations are found by fitting lines to the curve
Conjoined Cochlear Models:. the Twamp and the Sandwich
NASA Astrophysics Data System (ADS)
Hubbard, Allyn
2009-02-01
A new model of the cochlea is created by joining parts of the traveling-wave amplifier (TWAMP) and the Sandwich models. The lossy, untuned traveling-wave line of the TWAMP is retained, but the TWAMP's tuned traveling-wave line is replaced by the Sandwich's traveling-wave line that represents the reticular lamina (RL) and scala tympani. The model combines stereocilliary forces, which act between the tectorial membrane (TM) and RL, with somatic outer hair cell forces that power the Sandwich.
ISS EPS Orbital Replacement Unit Block Diagrams
NASA Technical Reports Server (NTRS)
Schmitz, Gregory V.
2001-01-01
The attached documents are being provided to Switching Power Magazine for information purposes. This magazine is writing a feature article on the International Space Station Electrical Power System, focusing on the switching power processors. These units include the DC-DC Converter Unit (DDCU), the Bi-directional Charge/Discharge Unit (BCDU), and the Sequential Shunt Unit (SSU). These diagrams are high-level schematics/block diagrams depicting the overall functionality of each unit.
ERIC Educational Resources Information Center
Baker, Cheryl B.
2011-01-01
Rural educators face many barriers when trying to participate in high quality professional development, including isolation, funding issues, distance, and lack of temporary replacements. Technological solutions can assist rural educators in overcoming these barriers. Participating in on-line professional learning communities can provide New…
Editing Transgenic DNA Components by Inducible Gene Replacement in Drosophila melanogaster
Lin, Chun-Chieh; Potter, Christopher J.
2016-01-01
Gene conversions occur when genomic double-strand DNA breaks (DSBs) trigger unidirectional transfer of genetic material from a homologous template sequence. Exogenous or mutated sequence can be introduced through this homology-directed repair (HDR). We leveraged gene conversion to develop a method for genomic editing of existing transgenic insertions in Drosophila melanogaster. The clustered regularly-interspaced palindromic repeats (CRISPR)/Cas9 system is used in the homology assisted CRISPR knock-in (HACK) method to induce DSBs in a GAL4 transgene, which is repaired by a single-genomic transgenic construct containing GAL4 homologous sequences flanking a T2A-QF2 cassette. With two crosses, this technique converts existing GAL4 lines, including enhancer traps, into functional QF2 expressing lines. We used HACK to convert the most commonly-used GAL4 lines (labeling tissues such as neurons, fat, glia, muscle, and hemocytes) to QF2 lines. We also identified regions of the genome that exhibited differential efficiencies of HDR. The HACK technique is robust and readily adaptable for targeting and replacement of other genomic sequences, and could be a useful approach to repurpose existing transgenes as new genetic reagents become available. PMID:27334272
Corliss, Deborah A.; Gray, Brianna; Anderson, Julia K.; Bobbin, Richard P.; Snyder, Evan Y.; Cotanche, Douglas A.
2007-01-01
Most cases of hearing loss are caused by the death or dysfunction of one of the many cochlear cell types. We examined whether cells from a neural stem cell line could replace cochlear cell types lost after exposure to intense noise. For this purpose, we transplanted a clonal stem cell line into the scala tympani of sound damaged mice and guinea pigs. Utilizing morphological, protein expression and genetic criteria, stem cells were found with characteristics of both neural tissues (satellite, spiral ganglion and Schwann cells) and cells of the organ of Corti (hair cells, supporting cells). Additionally, noise-exposed, stem cell-injected animals exhibited a small but significant increase in the number of satellite cells and Type I spiral ganglion neurons compared to non-injected noise-exposed animals. These results indicate that cells of this neural stem cell line migrate from the scala tympani to Rosenthal's canal and the organ of Corti. Moreover, it suggests that cells of this neural stem cell line may derive some information needed from the microenvironment of the cochlea to differentiate into replacement cells in the cochlea. PMID:17659854
37 CFR 1.805 - Replacement or supplement of deposit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Replacement or supplement of deposit. 1.805 Section 1.805 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES Biotechnology Invention Disclosures Deposit...
37 CFR 1.805 - Replacement or supplement of deposit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Replacement or supplement of deposit. 1.805 Section 1.805 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES Biotechnology Invention Disclosures Deposit...
Disposable remote zero headspace extractor
Hand, Julie J [Idaho Falls, ID; Roberts, Mark P [Arco, ID
2006-03-21
The remote zero headspace extractor uses a sampling container inside a stainless steel vessel to perform toxicity characteristics leaching procedure to analyze volatile organic compounds. The system uses an in line filter for ease of replacement. This eliminates cleaning and disassembly of the extractor. All connections are made with quick connect fittings which can be easily replaced. After use, the bag can be removed and disposed of, and a new sampling container is inserted for the next extraction.
Mandatory bundled payment getting into formation for value-based care.
Fink, John
2015-10-01
Succeeding under Medicare's enterprise Comprehensive Care for Joint Replacement Model will require collaboration among caregivers and financial arrangements to align incentives Priorities for most organization's transition to becoming a value-based hospitals will be care redesign, supply-purchasing strategy, and post-acute care provider partnering. Pursuing value for your joint replacement program will chart a path for other service lines and lead your organization's transition to becoming a value-based enterprise.
40 CFR Table 37 to Subpart Uuu of... - Requirements for Performance Tests for Bypass Lines
Code of Federal Regulations, 2010 CFR
2010-07-01
... Bypass Lines 37 Table 37 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 37 Table 37 to Subpart UUU of Part 63—Requirements for Performance Tests for Bypass Lines As stated in § 63...
40 CFR Table 36 to Subpart Uuu of... - Work Practice Standards for HAP Emissions From Bypass Lines
Code of Federal Regulations, 2011 CFR
2011-07-01
... Emissions From Bypass Lines 36 Table 36 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL... Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 36 Table 36 to Subpart UUU of Part 63—Work Practice Standards for HAP Emissions From Bypass Lines...
40 CFR Table 37 to Subpart Uuu of... - Requirements for Performance Tests for Bypass Lines
Code of Federal Regulations, 2011 CFR
2011-07-01
... Bypass Lines 37 Table 37 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 37 Table 37 to Subpart UUU of Part 63—Requirements for Performance Tests for Bypass Lines As stated in § 63...
40 CFR Table 36 to Subpart Uuu of... - Work Practice Standards for HAP Emissions From Bypass Lines
Code of Federal Regulations, 2010 CFR
2010-07-01
... Emissions From Bypass Lines 36 Table 36 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL... Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 36 Table 36 to Subpart UUU of Part 63—Work Practice Standards for HAP Emissions From Bypass Lines...
Replacing the Engine In Your Car While You Are Still Driving It
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bjorklund, Eric A.
Replacing your accelerator’s timing system with a completely different architecture is not something that happens very often. Perhaps even rarer is the requirement that the replacement not interfere with the accelerator’s normal operational cycle. In 2011, The Los Alamos Neutron Science Center (LANSCE) began the purchasing and installation phase of a nine-year rolling upgrade project which will eventually result in the complete replacement of the low-level RF system, the timing system, the industrial I/O system, the beam-synchronized data acquisition system, the fastprotect reporting system, and much of the diagnostic equipment. These projects are mostly independent of each other, with theirmore » own installation schedules, priorities, and time-lines. All of them, however, must interface with the timing system.« less
Monsivais, Pablo; Rehm, Colin D
2012-05-01
To estimate the nutritional and economic effects of substituting whole fruit for juice in the diets of children in the United States. Secondary analyses using the 2001-2004 National Health and Nutrition Examination Survey and a national food prices database. Energy intakes, nutrient intakes, and diet costs were estimated before and after fruit juices were completely replaced with fruit in 3 models that emphasized fruits that were fresh, inexpensive, and widely consumed and in a fourth model that partially replaced juice with fruit, capping juice at recommended levels. A nationwide, representative sample of children in the United States. A total of 7023 children aged 3 to 18 years. Systematic complete or partial replacement of juice with fruit. Difference in energy intakes, nutrient intakes, and diet costs between observed and modeled diets. For children who consumed juice, replacement of all juice servings with fresh, whole fruit led to a projected reduction in dietary energy of 233 kJ/d (-2.6% difference [95% CI, -5.1% to -0.1%]), an increase in fiber of 4.3 g/d (31.1% difference [95% CI, 26.4%-35.9%]), and an increase in diet cost of $0.54/d (13.3% difference [95% CI, 8.8%-17.8%]). Substitution of juice with fresh fruit has the potential to reduce energy intake and improve the adequacy of fiber intake in children's diets. This would likely increase costs for schools, childcare providers, and families. These cost effects could be minimized by selecting processed fruits, but fewer nutritional gains would be achieved.
The COHORT System - Is It Meeting the Army’s Needs
1988-06-06
soldier replacement system. Analysis compar- ing the COHORT system to the older, and still widely used, Individual Replace- ment System (IRS) is provided...Trinn (OMMe) soldie I •, I IIsstem. Analysis c~mering the a- system to the older, arid still3 widely used, Individural Syasit em (M) is rovided. 7he...allegiances frequently...efficiencies in individual replacements take no account of unit cohesion in the tank company , cannon battery or the Infantry
NASA Astrophysics Data System (ADS)
Spurgin, C. B.
1986-03-01
The author discusses the concept of dimensions of a physical quantity, and the relationship between derived units (expressed in terms of their base units) and the dimensions of the derived quantities. He calls for the replacement of 'dimensions' by base units in the GCE A-level syllabus and provides some recommendations to GCE examining boards.
8 CFR 233.4 - Preinspection outside the United States.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 8 Aliens and Nationality 1 2014-01-01 2014-01-01 false Preinspection outside the United States... CONTRACTS WITH TRANSPORTATION LINES § 233.4 Preinspection outside the United States. (a) Form I-425 agreements. A transportation line bringing applicants for admission to the United States through...
8 CFR 233.4 - Preinspection outside the United States.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 8 Aliens and Nationality 1 2011-01-01 2011-01-01 false Preinspection outside the United States... CONTRACTS WITH TRANSPORTATION LINES § 233.4 Preinspection outside the United States. (a) Form I-425 agreements. A transportation line bringing applicants for admission to the United States through...
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center begin to remove the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is secured on a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is positioned on a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
Operations analysis (study 2.1): Payload designs for space servicing
NASA Technical Reports Server (NTRS)
Wolfe, R. R.
1974-01-01
Potential modes of operating in space in the space shuttle era are documented. The October 1973 NASA Mission Model provides a definition of various NASA and non-DOD automated payload configurations when employed in an expendable mode. The model also specifies a launch schedule for initial deployment of payloads as well as for subsequent replacements at periodic cycles. This model and its associated payload definitions serve as a foundation for the data presented in this report. The reference model has been revised to reflect automated space servicing of payloads as an operational concept instead of the existing expendable approach. The indication is that the bulk of a payload's subsystems and mission equipment require no support over the lifetime of the program. However, failure of a single unit could result in loss of the mission objectives. When space servicing is employed, the approach is to replace only that unit causing the anomaly. This concept affords an opportunity to standardize space replacable units, as well as to reduce the expense of logistics support, by allowing multiple servicing on any single upper stage/shuttle flight.
NASA Astrophysics Data System (ADS)
Hendrickson, Thomas P.; Horvath, Arpad
2014-01-01
Water distribution systems (WDSs) face great challenges as aging infrastructures require significant investments in rehabilitation, replacement, and expansion. Reducing environmental impacts as WDSs develop is essential for utility managers and policy makers. This study quantifies the existing greenhouse gas (GHG) footprint of common WDS elements using life-cycle assessment (LCA) while identifying the greatest opportunities for emission reduction. This study addresses oversights of the related literature, which fails to capture several WDS elements and to provide detailed life-cycle inventories. The life-cycle inventory results for a US case study utility reveal that 81% of GHGs are from pumping energy, where a large portion of these emissions are a result of distribution leaks, which account for 270 billion l of water losses daily in the United States. Pipe replacement scheduling is analyzed from an environmental perspective where, through incorporating leak impacts, a tool reveals that optimal replacement is no more than 20 years, which is in contrast to the US average of 200 years. Carbon abatement costs (CACs) are calculated for different leak reduction scenarios for the case utility that range from -130 to 35 t-1 CO2(eq). Including life-cycle modeling in evaluating pipe materials identified polyvinyl chloride (PVC) and cement-lined ductile iron (DICL) as the Pareto efficient options, however; utilizing PVC presents human health risks. The model developed for the case utility is applied to California and Texas to determine the CACs of reducing leaks to 5% of distributed water. For California, annual GHG savings from reducing leaks alone (3.4 million tons of CO2(eq)) are found to exceed California Air Resources Board’s estimate for energy efficiency improvements in the state’s water infrastructure.
Facilitating Hemostasis After Proximal Aortic Surgery: Results of The PROTECT Trial.
Khoynezhad, Ali; DelaRosa, Jacob; Moon, Marc R; Brinkman, William T; Thompson, Richard B; Desai, Nimesh D; Malaisrie, S Chris; Girardi, Leonard N; Bavaria, Joseph E; Reece, T Brett
2018-05-01
This study intended to evaluate the safety and hemostatic efficacy of a novel vascular sealant (Tridyne; Neomend, Inc, Irvine, CA) compared with an accepted adjunctive hemostatic agent applied to aortotomy and sutures lines in cardiovascular operations. Patients undergoing aortic valve replacement, ascending aortic replacement, or aortic root replacement were randomly assigned 2:1 to Tridyne (n = 107) or Gelfoam Plus (Baxter Healthcare Corp, Hayward, CA) (n = 51). These groups were similar with regard to age, sex, race, medical history, duration of bypass and cross-clamping, and number of suture lines treated. Suture lines were treated after confirmation of some leakage but before formal removal of the clamp. The median bleeding time was significantly lower for Tridyne versus Gelfoam Plus (0 versus 10.0 minutes, p < 0.0001). Immediate hemostasis was achieved in 59.4% of the Tridyne group versus 16.0% of Gelfoam Plus group (p < 0.0001). A significantly greater proportion of patients in the Tridyne group achieved successful hemostasis at the aortic suture line than patients in the Gelfoam Plus group (85.7% versus 40.0%, p < 0.0001). The Clinical Events Committee adjudicated 7 patients with possible device-related serious adverse events: 3 patients (2.9%) in the Tridyne group and 4 patients (8.2%) in the Gelfoam Plus group (p = 0.2097). Tridyne was safe and effective when used as an adjunct to conventional hemostasis to treat high-pressure vessels in patients who receive anticoagulation agents, in reducing time to hemostasis, and in promoting both immediate and persistent hemostasis. Copyright © 2018 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.
46 CFR 7.120 - Mexican/United States border to Point Fermin, CA.
Code of Federal Regulations, 2014 CFR
2014-10-01
... BOUNDARY LINES Pacific Coast § 7.120 Mexican/United States border to Point Fermin, CA. (a) A line drawn... 46 Shipping 1 2014-10-01 2014-10-01 false Mexican/United States border to Point Fermin, CA. 7.120... “5”); thence to Point Loma Light. (b) A line drawn from Mission Bay South Jetty Light “2” to Mission...
46 CFR 7.120 - Mexican/United States border to Point Fermin, CA.
Code of Federal Regulations, 2012 CFR
2012-10-01
... BOUNDARY LINES Pacific Coast § 7.120 Mexican/United States border to Point Fermin, CA. (a) A line drawn... 46 Shipping 1 2012-10-01 2012-10-01 false Mexican/United States border to Point Fermin, CA. 7.120... “5”); thence to Point Loma Light. (b) A line drawn from Mission Bay South Jetty Light “2” to Mission...
46 CFR 7.120 - Mexican/United States border to Point Fermin, CA.
Code of Federal Regulations, 2010 CFR
2010-10-01
... BOUNDARY LINES Pacific Coast § 7.120 Mexican/United States border to Point Fermin, CA. (a) A line drawn... 46 Shipping 1 2010-10-01 2010-10-01 false Mexican/United States border to Point Fermin, CA. 7.120... “5”); thence to Point Loma Light. (b) A line drawn from Mission Bay South Jetty Light “2” to Mission...
46 CFR 7.120 - Mexican/United States border to Point Fermin, CA.
Code of Federal Regulations, 2013 CFR
2013-10-01
... BOUNDARY LINES Pacific Coast § 7.120 Mexican/United States border to Point Fermin, CA. (a) A line drawn... 46 Shipping 1 2013-10-01 2013-10-01 false Mexican/United States border to Point Fermin, CA. 7.120... “5”); thence to Point Loma Light. (b) A line drawn from Mission Bay South Jetty Light “2” to Mission...
46 CFR 7.120 - Mexican/United States border to Point Fermin, CA.
Code of Federal Regulations, 2011 CFR
2011-10-01
... BOUNDARY LINES Pacific Coast § 7.120 Mexican/United States border to Point Fermin, CA. (a) A line drawn... 46 Shipping 1 2011-10-01 2011-10-01 false Mexican/United States border to Point Fermin, CA. 7.120... “5”); thence to Point Loma Light. (b) A line drawn from Mission Bay South Jetty Light “2” to Mission...
NASA Astrophysics Data System (ADS)
Park, Jong Ho; Ahn, Byung Tae
2003-01-01
A failure model for electromigration based on the "failure unit model" was presented for the prediction of lifetime in metal lines.The failure unit model, which consists of failure units in parallel and series, can predict both the median time to failure (MTTF) and the deviation in the time to failure (DTTF) in Al metal lines. The model can describe them only qualitatively. In our model, both the probability function of the failure unit in single grain segments and polygrain segments are considered instead of in polygrain segments alone. Based on our model, we calculated MTTF, DTTF, and activation energy for different median grain sizes, grain size distributions, linewidths, line lengths, current densities, and temperatures. Comparisons between our results and published experimental data showed good agreements and our model could explain the previously unexplained phenomena. Our advanced failure unit model might be further applied to other electromigration characteristics of metal lines.
Characterization and differentiation of human embryonic stem cells.
Carpenter, M K; Rosler, E; Rao, M S
2003-01-01
Cell replacement therapies have been limited by the availability of sufficient quantities of cells for transplantation. Human ES (hES) cell lines have recently been generated by several laboratories. When maintained for over 1 year in vitro, they remain karyotypically and phenotypically stable and may therefore provide an excellent source material for cell therapies. Currently, data is available for 26 hES cell lines. Although limited characterization has been performed on most of these lines, there are remarkable similarities in expression of markers. hES cell lines derived in different laboratories show similar expression profiles of surface markers, including SSEA-4, Tra-1-60, and Tra-1-81. In addition, markers associated with pluripotent cells such as OCT-4 are expressed at in all cell lines tested. These cells express high levels of telomerase and appear to have indefinite growth potential. The generation of the large quantities of cells necessary for cell replacement therapies will require a cell population which is stable over long term culture. We have characterized the properties of multiple hES cell lines that have been maintained in culture for extended periods. Quantitative analyses demonstrate that all of the cell lines examined show consistent marker expression and retain a normal karyotype after long-term culture. hES cells have been differentiated into the derivatives of all three germ layers. Specifically this includes cardiomyocytes, neural cells, hepatocyte-like cells, endothelial cells and hematopoietic progenitor cells. These data demonstrating the karyotypic and phenotypic stability of hES cells and their extensive differentiative capacity indicate that they may be an appropriate source of cells for multiple regenerative medicine applications.
48 CFR 1846.672-1 - Preparation instructions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... authority for the shipment. (iii) When Government-furnished property (GFP) is included with or incorporated into the line item, enter “GFP”. (iv) When the shipment consists of replacements for supplies...
48 CFR 1846.672-1 - Preparation instructions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... authority for the shipment. (iii) When Government-furnished property (GFP) is included with or incorporated into the line item, enter “GFP”. (iv) When the shipment consists of replacements for supplies...
48 CFR 1846.672-1 - Preparation instructions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... authority for the shipment. (iii) When Government-furnished property (GFP) is included with or incorporated into the line item, enter “GFP”. (iv) When the shipment consists of replacements for supplies...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-14
... megawatt (MW) turbine-generator units near the existing powerhouse. Additionally, the Fish Valve Unit would be replaced with a new 1 MW turbine-generator unit and the 870 kilowatt Pulp Mill Feeder Unit would... new water intake in the reservoir 109 feet above the existing intake. The higher maximum reservoir...
NASA Astrophysics Data System (ADS)
Davis, Richard S.
2017-05-01
The revised International System of Units (SI), expected to be approved late in 2018, has implications for physics pedagogy. The ampere definition, which dates from 1948, will be replaced by a definition that fixes the numerical value of the elementary charge e in coulombs. The kilogram definition, which dates from 1889, will be replaced by a definition that fixes the numerical value of the Planck constant h in joule seconds. Existing SI equations will be completely unaffected. However, there will be a largely negligible, but nevertheless necessary, change to published numerical factors relating SI electrical units to their corresponding units in the Gaussian and other CGS systems of units. The implications of the revised SI for electrical metrology are neatly illustrated by considering the interpretation of results obtained from a current balance in the present SI and in the revised SI.
NASA Astrophysics Data System (ADS)
Grzeszczak, Jan; Grela, Łukasz; Achter, Thomas
2017-12-01
The paper covers problems of the owners of a fleet of long-operated conventional power plants that are going to be decommissioned soon in result of failing to achieve new admissible emissions levels or exceeding pressure elements design lifetime. Energoprojekt-Katowice SA, Siemens AG and Rafako SA presents their joint concept of the solution which is a 2on1 concept - replacing two unit by two ultra-supercritical boilers feeding one turbine. Polish market has been taken as an example.
Degradation of Beta-Cloth Covering for a Battery Orbital Replacement Unit in Low Earth Orbit
NASA Technical Reports Server (NTRS)
Gaier, James R.; Baldwin, Sammantha; Folz, Angela D.; Waters, Deborah L.; Loos, Alyssa
2016-01-01
Samples from the B-cloth cover for a battery orbit replaceable unit from the International Space Station were characterized using optical and electron microscopy, UV-vis-NIR spectrophotometry, and x-ray energy dispersive spectroscopy. Results showed that in areas where the fabric was exposed to solar radiation the absorptance increased by as much as 20 percent, and the peak difference was in the ultraviolet, indicating that the increased absorptance may have been due to radiation. The emissivity of the material over a temperature range of 300 - 700 K was essentially unchanged.
Degradation of Beta Cloth Covering for a Battery Orbital Replacement Unit in Low Earth Orbit
NASA Technical Reports Server (NTRS)
Gaier, James R.; Waters, Deborah L.; Baldwin, Sammantha; Folz, Angela D.; Loos, Alyssa
2016-01-01
Samples from the beta cloth cover for a battery orbit replaceable unit from the International Space Station (ISS) were characterized using optical and electron microscopy, UV-vis-NIR spectrophotometry, and x-ray energy dispersive spectroscopy. Results showed that in areas where the fabric was exposed to solar radiation the absorptance increased by as much as 20 percent, and the peak difference was in the ultraviolet, indicating that the increased absorptance may have been due to radiation. The emissivity of the material over a temperature range of 300 to 700 K was essentially unchanged.
NASA Technical Reports Server (NTRS)
Anderson, Leif F.; Harrington, Sean P.; Omeke, Ojei, II; Schwaab, Douglas G.
2009-01-01
This is a case study on revised estimates of induced failure for International Space Station (ISS) on-orbit replacement units (ORUs). We devise a heuristic to leverage operational experience data by aggregating ORU, associated function (vehicle sub -system), and vehicle effective' k-factors using actual failure experience. With this input, we determine a significant failure threshold and minimize the difference between the actual and predicted failure rates. We conclude with a discussion on both qualitative and quantitative improvements the heuristic methods and potential benefits to ISS supportability engineering analysis.
Umbilical-spinous line: a morphological term that should be included in the anatomical terminology
Ríos, John
2013-01-01
We argue the need to include in the International Anatomical Terminology the term "Umbilical-spinous line" for its importance as a morphological referent in bioscopic and surface anatomy. Also, in order to avoid using eponyms, it is suggested that the traditional term "McBurney point" be replaced by "supra spinous point" as being more descriptive of location. PMID:24892620
2016-10-03
of UK design and manufacture . 12 For more on the arrangement for jointly building Virginia- class boats, see CRS Report RL32418, Navy Virginia (SSN...lines would result in a cumulative one year schedule reduction in Missile Tube Module manufacturing for the OR Class . This schedule reduction, on a...Navy Columbia Class (Ohio Replacement) Ballistic Missile Submarine (SSBN[X]) Program: Background and Issues for Congress Ronald O’Rourke
37 CFR 7.28 - Replacement of U.S. registration by registered extension of protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Replacement of U.S. registration by registered extension of protection. 7.28 Section 7.28 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT...
Estimation of Variance in the Case of Complex Samples.
ERIC Educational Resources Information Center
Groenewald, A. C.; Stoker, D. J.
In a complex sampling scheme it is desirable to select the primary sampling units (PSUs) without replacement to prevent duplications in the sample. Since the estimation of the sampling variances is more complicated when the PSUs are selected without replacement, L. Kish (1965) recommends that the variance be calculated using the formulas…
HEATING ATTIC AIR USING SOLAR THERMAL ENERGY FOR SPACE HEATING AND DRYING APPLICATIONS
This unit is expected to replace the conventional forms of drying and will be able to supplement space heating. Replacement of these current forms of drying and space heating will result in the reduction of energy consumption from this sector which will also lead to cost savin...
37 CFR 7.29 - Effect of replacement on U.S. registration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Effect of replacement on U.S. registration. 7.29 Section 7.29 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT TO THE PROTOCOL RELATING TO THE MADRID AGREEMENT...
37 CFR 7.29 - Effect of replacement on U.S. registration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Effect of replacement on U.S. registration. 7.29 Section 7.29 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT TO THE PROTOCOL RELATING TO THE MADRID AGREEMENT...
37 CFR 7.29 - Effect of replacement on U.S. registration.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Effect of replacement on U.S. registration. 7.29 Section 7.29 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT TO THE PROTOCOL RELATING TO THE MADRID AGREEMENT...
37 CFR 7.29 - Effect of replacement on U.S. registration.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Effect of replacement on U.S. registration. 7.29 Section 7.29 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT TO THE PROTOCOL RELATING TO THE MADRID AGREEMENT...
37 CFR 7.29 - Effect of replacement on U.S. registration.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Effect of replacement on U.S. registration. 7.29 Section 7.29 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT TO THE PROTOCOL RELATING TO THE MADRID AGREEMENT...
46 CFR 56.01-1 - Scope (replaces 100.1).
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 2 2013-10-01 2013-10-01 false Scope (replaces 100.1). 56.01-1 Section 56.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...
46 CFR 56.01-1 - Scope (replaces 100.1).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Scope (replaces 100.1). 56.01-1 Section 56.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...
46 CFR 56.01-1 - Scope (replaces 100.1).
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 2 2012-10-01 2012-10-01 false Scope (replaces 100.1). 56.01-1 Section 56.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...
46 CFR 56.01-1 - Scope (replaces 100.1).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 2 2011-10-01 2011-10-01 false Scope (replaces 100.1). 56.01-1 Section 56.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...
46 CFR 56.01-1 - Scope (replaces 100.1).
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 2 2014-10-01 2014-10-01 false Scope (replaces 100.1). 56.01-1 Section 56.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...
Development of an intelligent controller for power generators
NASA Astrophysics Data System (ADS)
Maxted, Clive; Waller, Winston
2005-01-01
This paper is a description of the development of an embedded controller for high power industrial diesel generators. The aim of the project was to replace the existing discrete logic design by an intelligent versatile and user configurable control system. A prototype embedded PC controlled system was developed, capable of fully replacing the existing system, with a colour TFT display and keypad. Features include fully automatic generator control as before with status and alarm display and monitoring of engine parameters, along with data logging, remote communications and a means of analysing data. The unit was tested on the bench and on diesel generators for the core controlling functionality to prove compliance with the specifications. The results of the testing proved the unit's suitability as a replacement for the existing system in its intended environment. The significance of this study is that a low cost replacement solution has been found for an industrial application by transferring modern technological knowledge to a small business. The company are now able to build on the design and take it into production, reducing servicing and production costs.
Temperature variation, bacterial diversity and fungal infection dynamics in the amphibian skin.
Longo, Ana V; Zamudio, Kelly R
2017-09-01
Host-associated bacterial communities on the skin act as the first line of defence against invading pathogens. Yet, for most natural systems, we lack a clear understanding of how temperature variability affects structure and composition of skin bacterial communities and, in turn, promotes or limits the colonization of opportunistic pathogens. Here, we examine how natural temperature fluctuations might be related to changes in skin bacterial diversity over time in three amphibian populations infected by the pathogenic fungus Batrachochytrium dendrobatidis (Bd). Our focal host species (Eleutherodactylus coqui) is a direct-developing frog that has suffered declines at some populations in the last 20 years, while others have not experienced any changes. We quantified skin bacterial alpha- and beta-diversity at four sampling time points, a period encompassing two seasons and ample variation in natural infections and environmental conditions. Despite the different patterns of infection across populations, we detected an overall increase in bacterial diversity through time, characterized by the replacement of bacterial operational taxonomic units (OTUs). Increased frog body temperatures possibly allowed the colonization of bacteria as well as the recruitment of a subset of indicator OTUs, which could have promoted the observed changes in diversity patterns. Our results suggest that natural environmental fluctuations might be involved in creating opportunities for bacterial replacement, potentially attenuating pathogen transmission and thus contributing to host persistence in E. coqui populations. © 2017 John Wiley & Sons Ltd.
77 FR 61303 - Airworthiness Directives; Turbomeca S.A. Turboshaft Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-09
...-mechanical metering unit (HMU). This proposed AD would require replacing the HMU at a reduced life. We are... pressure/low pressure (HP/LP) pump assembly within the hydro- mechanical metering unit (HMU), removed...-mechanical metering unit (HMU). We are issuing this AD to prevent an uncommanded in-flight shutdown of the...
Takahashi, K; Kajiwara, K; Oda, Y; Kasugai, A; Kobayashi, N; Sakamoto, K; Doane, J; Olstad, R; Henderson, M
2011-06-01
High power, long pulse millimeter (mm) wave experiments of the RF test stand (RFTS) of Japan Atomic Energy Agency (JAEA) were performed. The system consists of a 1 MW/170 GHz gyrotron, a long and short distance transmission line (TL), and an equatorial launcher (EL) mock-up. The RFTS has an ITER-relevant configuration, i.e., consisted by a 1 MW-170 GHz gyrotron, a mm wave TL, and an EL mock-up. The TL is composed of a matching optics unit, evacuated circular corrugated waveguides, 6-miter bends, an in-line waveguide switch, and an isolation valve. The EL-mock-up is fabricated according to the current design of the ITER launcher. The Gaussian-like beam radiation with the steering capability of 20°-40° from the EL mock-up was also successfully proved. The high power, long pulse power transmission test was conducted with the metallic load replaced by the EL mock-up, and the transmission of 1 MW/800 s and 0.5 MW/1000 s was successfully demonstrated with no arcing and no damages. The transmission efficiency of the TL was 96%. The results prove the feasibility of the ITER electron cyclotron heating and current drive system. © 2011 American Institute of Physics
ERIC Educational Resources Information Center
Saxe, Geoffrey B.; Shaughnessy, Meghan M.; Gearhart, Maryl; Haldar, Lina Chopra
2013-01-01
Two investigations of fifth graders' strategies for locating whole numbers on number lines revealed patterns in students' coordination of numeric and linear units. In Study 1, we investigated the effects of context on students' placements of three numbers on an open number line. For one group ("n"?=?24), the line was presented in a…
76 FR 49478 - Notice of Agreements Filed
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
.... Parties: Hamburg-S[uuml]d; King Ocean Service de Venezuela; Seaboard Marine Ltd., and SeaFreight Line, Ltd...-4007. Synopsis: The amendment would replace King Ocean Service de Venezuela with King Ocean Services...
Effects of potassium titanate fiber on the wear of automotive brake linings
NASA Technical Reports Server (NTRS)
Halberstadt, M. L.; Mansfield, J. A.; Rhee, S. K.
1977-01-01
Asbestos reinforcing fiber in an automotive friction material was replaced by an experimental ingredient having better thermal stability, and the effects on wear and friction were studied. A friction materials test machine (SAE J661a) was used to determine friction and wear, under constant energy output conditions, as a function of temperature between 121 and 343 C (250 and 650 F). When potassium titanate fiber replaced one half of the asbestos in a standard commercial lining, with a 40 percent upward adjustment of phenolic resin content, wear above 204 C (400 F) was improved by 40% and friction by 30%. Tests on a full-scale inertial dynamometer supported the findings of the sample dynamometer tests. It was demonstrated that the potassium titanate fiber contributes directly to the improvement in wear and friction.
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, at ground-level left, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lowered onto a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, seen behind the ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
Flow-Control Unit For Nitrogen And Hydrogen Gases
NASA Technical Reports Server (NTRS)
Chang, B. J.; Novak, D. W.
1990-01-01
Gas-flow-control unit installed and removed as one piece replaces system that included nine separately serviced components. Unit controls and monitors flows of nitrogen and hydrogen gases. Designed for connection via fluid-interface manifold plate, reducing number of mechanical fluid-interface connections from 18 to 1. Unit provides increasing reliability, safety, and ease of maintenance, and for reducing weight, volume, and power consumption.
Pollution Prevention in the Land Maintenance System
2000-04-01
pollutants, and greenhouse gases. Canada’s Land Maintenance System consists of first line field units, second line field units, base units and a repair...workshops. For example, extending maintenance schedules, using extended life products and using dehumidification for preservation of equipment will lower
Modernisation Issues of Diesel-Electric Shunting Locomotive Power Units
NASA Astrophysics Data System (ADS)
Hoimoja, Hardi; Jalakas, Tanel; Rosin, Argo; Rassylkin, Anton
2010-01-01
The research concentrates on the modernisation issues of inefficient diesel-electric shunting locomotives, produced in the former Soviet Union. The existing diesel-generator unit, serving as an onboard power plant can be replaced by hybridised units, with an energy storage unit acting as a peaking power source for dynamic modes. By integrating an energy storage unit into the power plant, the locomotive traction drive becomes hybridised, consuming less fuel during transients and idling.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
.... Description of Application: The licensee proposes to replace one of the project's three existing turbine/generator units with a new unit. The project's maximum hydraulic capacity would remain the same but the new...
Tungsten insulated susceptor cup for high temperature induction furnace eliminates contamination
NASA Technical Reports Server (NTRS)
Geringer, H. J.
1966-01-01
METILUR /Materials Experimental Tungsten Induction Laboratory Unit Replacement/ is an improved, unitized design of a susceptor cup and shielding that uses only one type of construction material /tungsten/ which eliminates contamination. Cycling runs can be accomplished with METILUR.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... replacement outage that is currently underway at CR-3. In addition to steam generators, other large components (e.g., moisture separators and large heat exchangers) are being replaced during this outage... on the Internet at the NRC Web site: http://www.nrc.gov/reading-rm/adams.html . Persons who do not...
2009-12-01
Tactical Imaging Nano-sat Yielding Small-Cost Operations and Persistent Earth-coverage UFO UHF Follow On UHF Ultra-High Frequency USCG United...replaced by UHF Follow On ( UFO ) satellites in the 1990s. The UFO satellites are being updated and scheduled for replacement by the Mobile User
Mitochondrial Replacement Techniques: Divergence in Global Policy.
Schandera, Johanna; Mackey, Tim K
2016-07-01
In 2015, the UK became the first country permitting the clinical application of mitochondrial replacement techniques (MRT). Here, we explore how MRT have led to diverging international policy. In response, we recommend focused regulatory efforts coupled with United Nations (UN) leadership to build international consensus on the future of MRT. Copyright © 2016 Elsevier Ltd. All rights reserved.
Paul A. Weston; Richard W. Harper
2007-01-01
Several species of Tsuga from the western United States and Asia are under evaluation as potential replacements for T. canadensis being destroyed by hemlock woolly adelgid (Adelges tsugae Annand). Test plots were established in Katonah, NY in October, 2003, and trees were inoculated with adelgid egg masses in...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyer, R.T.; Coe, B.A.; Dick, J.D.
1981-01-01
Four state-owned building complexes ahve been evaluated within the city of Durango: The State Fish Hatchery, Fort Lewis College, new State Highway Department Building near the Bodo Industrial Park, and the National Guard Building. Three of the state facilities in Durango are evaluated for geothermal systems on thea ssumption of taking geothermal water from a trunk-line originating at the area northof Durango: State Fish Hatchery, Fort Lewis College and new State Highway Department Building. The National Guard Building is evaluated on the basis of a water-to-air heat pump, with warm water derived from a hypothetical shallow aquifer immediately below themore » building site. Two geothermal options were separately evaluated for Fort Lewis College: a central heat exchanger system for delivery of 145/sup 0/F heating water to the campus buildings and a central heat pump system for boosting the heating water to 200/sup 0/F prior to delivery to the buildings; both systems require the installation of a distribution piping network for the entire campus area. Retrofit engineering for the State Fish Hatchery provides for the installation of a small scale central distribution piping system to the several buildings, a central heat excanger coupled to the geothermal trunk line, and the use of various fan coil and unit heaters for space heating. An option is provided for discharge-mixing the geothermal water into the fish ponds and runs in order to raise the hatchery water temperature a couple degrees for increasing fish production and yield. The heating system for the new State Highway Department Building is redesigned to replace the natural-gas-fired forced-air furnaces with a heat exchanger, hot water fan coils and unit heaters.« less
ERIC Educational Resources Information Center
Birch, Elisa; Williams, Andrew
2013-01-01
This paper examines the impact of supplementary web-based materials on students' academic performance in a first-year economics unit at university. In particular, the paper considers the impact of students' usage of the unit's webpage, voluntary on-line discussion board, voluntary on-line quizzes and voluntary on-line homework questions on their…
ERIC Educational Resources Information Center
Chenail, Ronald J.
2012-01-01
In the first of a series of "how-to" essays on conducting qualitative data analysis, Ron Chenail points out the challenges of determining units to analyze qualitatively when dealing with text. He acknowledges that although we may read a document word-by-word or line-by-line, we need to adjust our focus when processing the text for purposes of…
Vicenti, Ilaria; Boccuto, Adele; Giannini, Alessia; Dragoni, Filippo; Saladini, Francesco; Zazzi, Maurizio
2018-01-15
A strong correlation between Zika virus (ZIKV) infection and severe neurological disease in newborns and occasionally adults has emerged in the Brazilian outbreak. Efficient human cell-based assays are required to test candidate inhibitors of ZIKV replication. The aim of this work was to investigate ZIKV propagation and quantification in different cell lines. The human (U87, A549, Huh7), mosquito (C6/36) and monkey (VERO E6) cell lines tested were all permissive to ZIKV infection. When assessed by plaque forming units (PFU) in three different target cell lines, the maximal production of ZIKV was achieved in Huh7 at day 3 post-infection (6.38±0.44 log 10 PFU/ml). The C6/36 cell line showed a low and slow production of virus when compared with other cell lines. A549 readout cells generated a larger number of plaques compared to Huh7 but not to VERO E6 cells. ZIKV PFU and RNA titers showed the highest correlation when Huh7 and A549 were used as the producer and readout cells, respectively. Also, U87 cells produced ZIKV RNA titers which were highly correlated with PFU independently from the readout cell line. Using the best virus-cell system, sofosbuvir and ribavirin EC 50 were 1.2μM and 1.1μM when measured through plaque assay, and 4.2μM and 5.2μM when measured by quantitative real time PCR (qRT-PCR), respectively. In summary, ZIKV can efficiently infect different human cell lines and rapidly reach peak viral titers. Overall, A549 cells appear to be as efficient as the VERO E6 gold standard for plaque assay allowing the use of human, rather than simian, cells for evaluating candidate anti-ZIKV compounds by the reference assay. The possibility to replace the labor-intensive plaque assay with the more rapid and easy-to-perform qRT-PCR is appealing and warrants further investigation. Copyright © 2017 Elsevier B.V. All rights reserved.
Enzyme replacement and substrate reduction therapy for Gaucher disease.
Shemesh, Elad; Deroma, Laura; Bembi, Bruno; Deegan, Patrick; Hollak, Carla; Weinreb, Neal J; Cox, Timothy M
2015-03-27
Gaucher disease, a rare disorder, is caused by inherited deficiency of the enzyme glucocerebrosidase. It is unique among the ultra-orphan disorders in that four treatments are currently approved by various regulatory authorities for use in routine clinical practice. Hitherto, because of the relatively few people affected worldwide, many of whom started therapy during a prolonged period when there were essentially no alternatives to imiglucerase, these treatments have not been systematically evaluated in studies such as randomized controlled trials now considered necessary to generate the highest level of clinical evidence. To summarize all available randomized controlled study data on the efficacy and safety of enzyme replacement therapies and substrate reduction therapy for treating Gaucher disease. We searched the Cochrane Cystic Fibrosis and Genetic Disorders Group's Inborn Errors of Metabolism Trials Register. Additional searches were conducted on ClinicalTrials.gov for any ongoing studies with potential interim results, and through PubMed. We also searched the reference lists of relevant articles and reviews.Date of last search: 07 August 2014. All randomized and quasi-randomized controlled studies (including open-label studies and cross-over studies) assessing enzyme replacement therapy or substrate reduction therapy, or both, in all types of Gaucher disease were included. Two authors independently assessed the risk of bias in the included studies, and extracted relevant data. Of the 488 studies retrieved by the electronic searches, eight met the inclusion criteria and were analysed (300 participants). Response parameters were restricted to haemoglobin concentration, platelet count, spleen and liver volume and serum biomarkers (chitotriosidase and CCL18). Only one publication reported a 'low risk of bias' score in all parameters assessed, and all studies included were randomized.Four studies reported the responses to enzyme replacement therapy of previously untreated individuals with type 1 Gaucher disease. Two studies investigated maintenance enzyme replacement therapy in people with stable type 1 Gaucher disease previously treated for at least two years. One study compared substrate reduction therapy, enzyme replacement therapy and a combination thereof as maintenance therapy in people with type 1 Gaucher disease previously treated with enzyme replacement therapy. One study examined substrate reduction therapy in people with chronic neuronopathic (type 3) Gaucher disease who continued to receive enzyme replacement therapy.Treatment-naïve participants had similar increases in haemoglobin when comparing those receiving imiglucerase or alglucerase at 60 units/kg, imiglucerase or velaglucerase alfa at 60 U/kg, taliglucerase alfa at 30 units/kg or 60 units/kg, and velaglucerase alfa at 45 units/g or 60 units/kg. For platelet count response in participants with intact spleens, a benefit for imiglucerase over velaglucerase alfa at 60 units/kg was observed, mean difference -79.87 (95% confidence interval -137.57 to -22.17). There were no other significant differences in platelet count response when comparing different doses of velaglucerase alfa and of taliglucerase alfa, and when comparing imiglucerase to alglucerase. Spleen and liver volume reductions were not significantly different in any enzyme replacement therapy product or dose comparison study. Although a dose effect on serum biomarkers was not seen after nine months, a significantly greater reduction with higher dose was reported after 12 months in the velaglucerase study, mean difference 16.70 (95% confidence intervaI 1.51 to 31.89). In the two enzyme replacement therapy maintenance studies comparing infusions every two weeks and every four weeks, there were no significant differences in haemoglobin concentration, platelet count, and spleen and liver volumes over a 6 to 12 month period when participants were treated with the same cumulative dose.A total of 25 serious adverse events were reported, nearly all deemed unrelated to treatment.There are, as yet, no randomized trials of substrate reduction therapy in treatment-naïve patients that can be evaluated. Miglustat monotherapy appeared as effective as continued enzyme replacement therapy for maintenance of hematological, organ and biomarker responses in people with type 1 Gaucher disease previously treated with imiglucerase for at least two years. In those with neuronopathic Gaucher disease, no significant improvements in haemoglobin concentration, platelet count or organ volumes occurred when enzyme replacement therapy was augmented with miglustat.One randomized controlled study assessing substrate reduction therapy was published immediately prior to producing the final version of this review, and this, along with a further ongoing study (expected to be published in the near future), will be assessed for eligibility in a future update of the review. The results reflect the limitations of analysing evidence restricted to prospective randomized controlled trials, especially when dealing with chronic rare diseases. This analysis suggests that, during the first year of treatment, different recombinant glucocerebrosidases are bio-similar and non-inferior in safety and efficacy for surrogate biological response parameters. Enzyme replacement therapy given at 30 to 45 units/kg body weight every two to four weeks was generally as effective as the 60 unit/kg dose for the assessed clinical outcomes. The analysis emphasise the need to determine whether it is realistic to carry out multi-decade prospective clinical trials for rare diseases such as type 1 Gaucher disease. With large treatment effects on the classical manifestations of the disorder, therapeutic investigations in Gaucher disease mandate innovative trial designs and methodology to secure decisive data concerning long-term efficacy and safety - with the realization that knowledge about disease-modifying actions that are sustained are of crucial importance to people with this chronic condition.
ERIC Educational Resources Information Center
McColskey, Wendy; Parke, Helen; Furtak, Erin; Butler, Susan
This article addresses what was learned through the National Computational Science Leadership Program about involving teachers in planning high quality units of instruction around computational science investigations. Two cohorts of roughly 25 teacher teams nationwide were given opportunities to develop "replacement units." The goal was to support…
Hydrogen Fuel Cell on a Helicopter: A System Engineering Approach
NASA Astrophysics Data System (ADS)
Nesheiwat, Rod
Hydrogen fuel cells have been previously investigated as a viable replacement to traditional gas turbine auxiliary power unit onboard fixed wing commercial jets. However, so far no study has attempted to extend their applicability to rotary wing aircrafts. To aid in the advancement of such innovative technologies, a holistic technical approach is required to ensure risk reduction and cost effectiveness throughout the product lifecycle. This paper will evaluate the feasibility of replacing a gas turbine auxiliary power unit on a helicopter with a direct hydrogen, air breathing, proton exchange membrane fuel cell, all while emphasizing a system engineering approach that utilize a specialized set of tools and artifacts.
Brobeck, W.M.
1959-04-14
This patent deals with calutrons and more particularly to an arrangement therein whereby charged bottles in a calutron source unit may be replaced without admitting atmospheric air to the calutron vacuum chamber. As described, an ion unit is disposed within a vacuum tank and has a reservoir open toward a wall of the tank. A spike projects from thc source into the reservoir. When a charge bottle is placed in the reservoir, the spike breaks a frangible seal on the bottle. After the contents of the bottle are expended the bottle may be withdrawn and replaced with another charge bottle by a varuum lock arrangement in conjunction with an arm for manipulating the bottle.
Brobeck, W. M.
1959-04-14
This patent deals with calutrons and more particularly to an arrangement therein whereby charged bottles in a calutron source unit may be replaced without admitting atmospheric air to the calutron vacuum chamber. As described, an ion unit is disposed within a vacuum tank and has a reservoir open toward a wall of the tank. A spike projects from the source into the reservoir. When a charge bottle is placed in the reservoir, the spike breaks a frangible seal on the bottle. After the contents of the bottle are expended the bottle may be withdrawn and replaced with another charge bottle by a vacuum lock arrangement in conjunction with an arm for manipulating the bottle.
Has Embase replaced MEDLINE since coverage expansion?
Lam, Michael Thomas; De Longhi, Christina; Turnbull, Joseph; Lam, Helen Rose; Besa, Reena
2018-04-01
The research tested the authors' hypothesis that more researchers from the academic medicine community in the United States and Canada with institutional access to Embase had started using Embase to replace MEDLINE since Embase was expanded in 2010 to cover all MEDLINE records. We contacted libraries of 140 and 17 medical schools in the United States and Canada, respectively, to confirm their subscriptions to Embase 5 years before and 5 years after 2010. We searched the names of institutions with confirmed Embase access in Ovid MEDLINE and Embase to retrieve works authored by affiliates of those institutions. We then examined 100 randomly selected records from each of the 5 years before and 5 years after the Embase coverage expansion in 2010. We hypothesized that studies that used Embase but not MEDLINE would increase due to the Embase coverage expansion. The number of studies that used Embase but not MEDLINE did not change between the pre-2010 and post-2010 periods. Our hypothesis was refuted. Studies that used Embase but not MEDLINE did not increase post-2010. Our results suggest the academic medicine community in the United States and Canada that had access did not use Embase to replace MEDLINE, despite the Embase coverage expansion.
Understanding Skill in EVA Mass Handling. Volume 1; Theoretical and Operational Foundations
NASA Technical Reports Server (NTRS)
Riccio, Gary; McDonald, Vernon; Peters, Brian; Layne, Charles; Bloomberg, Jacob
1997-01-01
This report describes the theoretical and operational foundations for our analysis of skill in extravehicular mass handling. A review of our research on postural control, human-environment interactions, and exploratory behavior in skill acquisition is used to motivate our analysis. This scientific material is presented within the context of operationally valid issues concerning extravehicular mass handling. We describe the development of meaningful empirical measures that are relevant to a special class of nested control systems: manual interactions between an individual and the substantial environment. These measures are incorporated into a unique empirical protocol implemented on NASA's principal mass handling simulator, the precision air-bearing floor, in order to evaluate skill in extravehicular mass handling. We discuss the components of such skill with reference to the relationship between postural configuration and controllability of an orbital replacement unit, the relationship between orbital replacement unit control and postural stability, the relationship between antecedent and consequent movements of an orbital replacement unit, and the relationship between antecedent and consequent postural movements. Finally, we describe our expectations regarding the operational relevance of the empirical results as it pertains to extravehicular activity tools, training, monitoring, and planning.
Should a coal-fired power plant be replaced or retrofitted?
Patiño-Echeverri, Dalia; Morel, Benoit; Apt, Jay; Chen, Chao
2007-12-01
In a cap-and-trade system, a power plant operator can choose to operate while paying for the necessary emissions allowances, retrofit emissions controls to the plant, or replace the unit with a new plant. Allowance prices are uncertain, as are the timing and stringency of requirements for control of mercury and carbon emissions. We model the evolution of allowance prices for SO2, NOx, Hg, and CO2 using geometric Brownian motion with drift, volatility, and jumps, and use an options-based analysis to find the value of the alternatives. In the absence of a carbon price, only if the owners have a planning horizon longer than 30 years would they replace a conventional coal-fired plant with a high-performance unit such as a supercritical plant; otherwise, they would install SO2 and NOx, controls on the existing unit. An expectation that the CO2 price will reach $50/t in 2020 makes the installation of an IGCC with carbon capture and sequestration attractive today, even for planning horizons as short as 20 years. A carbon price below $40/t is unlikely to produce investments in carbon capture for electric power.
First non-OEM steam-generator replacement in US a success
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hendsbee, P.M.; Lees, M.D.; Smith, J.C.
1994-04-01
In selecting replacements for major powerplant components, a fresh approach can be advantageous--even when complex nuclear components are involved. This was the experience at Unit 2 of Millstone nuclear station, which features an 870-MW pressurized-water reactor (PWR) with two nuclear recirculating steam generators. The unit began operation in 1975. In the early 1980s, pitting problems surfaced in the steam generator tubing; by the mid eighties, tube corrosion had reached an unacceptable level. Virtually all of the 17,000 tubes in the two units were deteriorating, with 2500 plugged and 5000 sleeved. Several new problems also were identified, including secondary-side circumferential crackingmore » of the Alloy 600 tubing near the tubesheet face, and deterioration of the carbon steel egg-crate tube supports. Despite improvements to primary and secondary steam-generator water chemistry, including almost complete copper removal from the condensate and feedwater loops, Northeast Utilities (NU) was unable to completely control degradation of the tube bundles. The utility decided in 1987 that full replacement was the most viable alternative. NU made a bold move, selecting a supplier other than the original equipment manufacturer (OEM).« less
Recommendations for Enabling Manual Component Level Electronic Repair for Future Space Missions
NASA Technical Reports Server (NTRS)
Struk, Peter M.; Easton, John W.; Funk, Gregory P.; Latta, Gary S.; Ganster, Andrew W.; Estes, Brett E.
2011-01-01
Long duration missions to the Moon and Mars pose a number of challenges to mission designers, controllers, and the crews. Among these challenges are planning for corrective maintenance actions which often require a repair. Current repair strategies on the International Space Station (ISS) rely primarily on the use of Orbital Replacement Units (ORUs), where a faulty unit is replaced with a spare, and the faulty unit typically returns to Earth for analysis and possible repair. The strategy of replace to repair has posed challenges even for the ISS program. Repairing faulty hardware at lower levels such as the component level can help maintain system availability in situations where no spares exist and potentially reduce logistic resupply mass.This report provides recommendations to help enable manual replacement of electronics at the component-level for future manned space missions. The recommendations include hardware, tools, containment options, and crew training. The recommendations are based on the work of the Component Level Electronics Assembly Repair (CLEAR) task of the Exploration Technology Development Program from 2006 to 2009. The recommendations are derived based on the experience of two experiments conducted by the CLEAR team aboard the International Space Station as well as a group of experienced Miniature/Microminiature (2M) electronics repair technicians and instructors from the U.S. Navy 2M Project Office. The emphasis of the recommendations is the physical repair. Fault diagnostics and post-repair functional test are discussed in other CLEAR reports.
TOTAL KNEE REPLACEMENT IN PATIENTS WITH BELOW-KNEE AMPUTATION
Karam, Matthew D; Willey, Michael; Shurr, Donald G
2010-01-01
Total knee replacement (TKR) is reserved for patients with severe and disabling arthritis that is non-responsive to conservative measures. Based on existing data, total knee replacement is a safe and cost-effective treatment for alleviating pain and improving physical function in patients who do not respond to conservative therapy. Despite the large variation in health status of patients and types of prosthesis implanted, total knee replacement has proven to be a relatively low risk and successful operation. Each year in the United States surgeons perform approximately 300,000 TKR.1 Likewise, lower extremity amputation is commonly performed in the United States with an annual incidence of 110,000 per year.2 Nearly 70% of all lower extremity amputations are performed as the result of chronic vascular disease, followed by trauma (22%), congenital etiology and tumor (4% each).3 Approximately 50% of all lower extremity amputations are performed secondary to complications from Diabetes Mellitus. Norvell et al. demonstrated that patients who have previously undergone transtibial amputation and ambulate with a prosthesis are more likely to develop degenerative joint disease in the con-tralateral extremity than the ipsilateral extremity.4 Further, radiographic changes consistent with osteoporosis have been demonstrated in up to 88% of limbs that have undergone transtibial amputation.8 To our knowledge, there have been only three reported cases of total knee replacement in patients with ipsilateral transtibial amputation.5,7 The purpose of the present study is to review the existing data on total knee replacement in patients who have undergone transtibial amputation. Further we present a patient with a transtibial amputation who underwent contralateral total knee replacement. PMID:21045987
An Exploration of Administrative Heuristics in the United States and the United Kingdom
ERIC Educational Resources Information Center
English, Fenwick W.; Bolton, Cheryl L.
2008-01-01
This article is a report on a study of the use of heuristics, shortcuts, and rules of thumb by middle-line managers in institutions of higher education in the United States and the United Kingdom. Using a nonprobability convenience sample, the coinvestigators interviewed 13 middle-line managers over 5 months from eight institutions. The results…
40 CFR 270.4 - Effect of a permit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... regarding leak detection systems for new and replacement surface impoundment, waste pile, and landfill units, and lateral expansions of surface impoundment, waste pile, and landfill units. The leak detection system requirements include double liners, CQA programs, monitoring, action leakage rates, and response...
2012-12-04
CAPE CANAVERAL, Fla. -- Workers inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida position the orbital replacement unit for the space station's main bus switching unit as they prepare to pack the unit in a shipping container. The unit, which was processed at Kennedy, will be shipped to Japan at the beginning of the year for the HTV-4 launch, which is currently scheduled for 2013. Photo credit: NASA/Charisse Nahser
2012-12-04
CAPE CANAVERAL, Fla. -- Workers inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida lift the orbital replacement unit for the space station's main bus switching unit as they prepare to pack the unit in a shipping container. The unit, which was processed at Kennedy, will be shipped to Japan at the beginning of the year for the HTV-4 launch, which is currently scheduled for 2013. Photo credit: NASA/Charisse Nahser
9. UNIT 4, 'DOG HOLE' IN TURBINE, SHOWING LUBRICATING LINES ...
9. UNIT 4, 'DOG HOLE' IN TURBINE, SHOWING LUBRICATING LINES ENTERING TURBINE BEARING HOUSING THROUGH FORMER 'SIGHT GLASSES,' WITH OVERFLOW/RETURN OIL PIPE (CENTER FOREGROUND) - Washington Water Power Company Monroe Street Plant, Units 4 & 5, South Bank Spokane River, below Monroe Street Bridge, Spokane, Spokane County, WA
Steam generator feedwater nozzle transition piece replacement experience at Salem Unit 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patten, D.B.; Perrin, J.S.; Roberts, A.T.
Cracking of steam generator feedwater piping adjacent to the feedwater nozzles has been a recurring problem since 1979 at Salem Unit 1 owned and operated by Public Service Electric and Gas Company. In addition to the cracking problem, erosion-corrosion at the leading edge of the feedwater nozzle thermal sleeve was also observed in 1992. To provide a long-term solution for the pipe cracking and thermal sleeve erosion-corrosion problems, a unique transition piece forging was specially designed, fabricated, and installed for each of the four steam generators during the 1995 outage. This paper discusses the design, fabrication, and installation of themore » transition piece forgings at Salem Unit 1, and the experiences gained from this project. It is believed that these experiences may help other utilities when planning similar replacements in the future.« less
Wavelength Locking to CO2 Absorption Line-Center for 2-Micron Pulsed IPDA Lidar Application
NASA Technical Reports Server (NTRS)
Refaat, Tamer F.; Petros, Mulugeta; Antill, Charles W.; Singh, Upendra N.; Yu, Jirong
2016-01-01
An airborne 2-micron triple-pulse integrated path differential absorption (IPDA) lidar is currently under development at NASA Langley Research Center (LaRC). This IPDA lidar system targets both atmospheric carbon dioxide (CO2) and water vapor (H2O) column measurements. Independent wavelength control of each of the transmitted laser pulses is a key feature for the success of this instrument. The wavelength control unit provides switching, tuning and locking for each pulse in reference to a 2-micron CW (Continuous Wave) laser source locked to CO2 line-center. Targeting the CO2 R30 line center, at 2050.967 nanometers, a wavelength locking unit has been integrated using semiconductor laser diode. The CO2 center-line locking unit includes a laser diode current driver, temperature controller, center-line locking controller and CO2 absorption cell. This paper presents the CO2 center-line locking unit architecture, characterization procedure and results. Assessment of wavelength jitter on the IPDA measurement error will also be addressed by comparison to the system design.
Loftus, Kelli; Tilley, Terry; Hoffman, Jason; Bradburn, Eric; Harvey, Ellen
2015-01-01
The creation of a consistent culture of safety and quality in an intensive care unit is challenging. We applied the Six Sigma Define-Measure-Analyze-Improve-Control (DMAIC) model for quality improvement (QI) to develop a long-term solution to improve outcomes in a high-risk neurotrauma intensive care unit. We sought to reduce central line utilization as a cornerstone in preventing central line-associated bloodstream infections (CLABSIs). This study describes the successful application of the DMAIC model in the creation and implementation of evidence-based quality improvement designed to reduce CLABSIs to below national benchmarks.
Fluid injection device for high-pressure systems
NASA Technical Reports Server (NTRS)
Copeland, E. J.; Ward, J. B.
1970-01-01
Screw activated device, consisting of a compressor, shielded replaceable ampules, a multiple-element rubber gland, and a specially constructed fluid line fitting, injects measured amounts of fluids into a pressurized system. It is sturdy and easily manipulated.
46 CFR 56.50-1 - General (replaces 122).
Code of Federal Regulations, 2014 CFR
2014-10-01
... liquids, except that tank barges having plug cocks inside cargo tanks may have reach rods of extra-heavy...-indicating lines at the control boards which indicate the desired valve positions, i.e., open or closed. (h...
46 CFR 56.50-1 - General (replaces 122).
Code of Federal Regulations, 2012 CFR
2012-10-01
... liquids, except that tank barges having plug cocks inside cargo tanks may have reach rods of extra-heavy...-indicating lines at the control boards which indicate the desired valve positions, i.e., open or closed. (h...
46 CFR 56.50-1 - General (replaces 122).
Code of Federal Regulations, 2013 CFR
2013-10-01
... liquids, except that tank barges having plug cocks inside cargo tanks may have reach rods of extra-heavy...-indicating lines at the control boards which indicate the desired valve positions, i.e., open or closed. (h...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
... (Interstate Common line Support (ICLS)) to replace implicit support in interstate access charges with explicit... performance of the functions of the Commission, including whether the information shall have practical utility...
24 CFR 58.35 - Categorical exclusions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... capacity of more than 20 percent (e.g., replacement of water or sewer lines, reconstruction of curbs and... use is not changed, and the footprint of the building is not increased in a floodplain or in a wetland...
ERIC Educational Resources Information Center
Espenshade, Thomas J.
The low fertility of Western industrial nations is likely to become a permanent condition; in the absence of immigration, populations with below-replacement fertility will eventually decline in size. But at the same time fertility is declining, international migration to the West is accelerating. Legal immigration to the United States rose from…
Housing Operation Management System (HOMES). Volume 7. Assignments and Terminations User Manual.
1984-04-01
PAINTED. SANDED, AND COMPONENT REPLACED. ADDITIONAL ENGINEERING FUNCTIONS WILL BE AVAILABLE IN THE HEAR FUTURE WHEN THE HOMES ENGINEERING SUBSYSTEM IS...OPERATOR OFF- LINE PROCESS rTERMINATION HOMES 001 ENTER PFI B ATE PROVIDED- BY OCCUPANT SCHDUL HOMES 200 ENTER PFIO PRETERM . 1 INSPECTION PREPARE AOV...OPERATOR OFF-LINE PROCESS S INSPECTOR OBTAINS HAND RECEIPT I 8CHECK LIST INSPECTOR 1 OBTAINS LISTOF OUTSTANDING M&R REQMTS . INSPECTOR CONDUCTS PRETERM
Comparison of cropland and forest surface temperatures across the conterminous United States
Global climate models (GCM) investigating the effects of land cover on climate have found that replacing extra-tropical forest with cropland promotes cooling. We compared cropland and forest surface temperatures across the continental United States in 16 cells that were approxim...
NASA Astrophysics Data System (ADS)
Rhodes, Russel E.; Byrd, Raymond J.
1998-01-01
This paper presents a ``back of the envelope'' technique for fast, timely, on-the-spot, assessment of affordability (profitability) of commercial space transportation architectural concepts. The tool presented here is not intended to replace conventional, detailed costing methodology. The process described enables ``quick look'' estimations and assumptions to effectively determine whether an initial concept (with its attendant cost estimating line items) provides focus for major leapfrog improvement. The Cost Charts Users Guide provides a generic sample tutorial, building an approximate understanding of the basic launch system cost factors and their representative magnitudes. This process will enable the user to develop a net ``cost (and price) per payload-mass unit to orbit'' incorporating a variety of significant cost drivers, supplemental to basic vehicle cost estimates. If acquisition cost and recurring cost factors (as a function of cost per payload-mass unit to orbit) do not meet the predetermined system-profitability goal, the concept in question will be clearly seen as non-competitive. Multiple analytical approaches, and applications of a variety of interrelated assumptions, can be examined in a quick, (on-the-spot) cost approximation analysis as this tool has inherent flexibility. The technique will allow determination of concept conformance to system objectives.
Heterogeneity in preferences for woody biomass energy in the US Mountain West
Robert M. Campbell; Tyron J. Venn; Nathaniel M. Anderson
2018-01-01
The United States has passed legislation aimed at reducing greenhouse gas emissions (United States Congress, 2005; United States Congress, 2007; EPA, 2015). In order to achieve the goals set by these commitments, significant amounts of fossil fuel energy will need to be replaced with renewable energy. There are multiple renewable technologies from which to choose, and...
Guo, Yang; Tian, Jinping; Chertow, Marian; Chen, Lujun
2016-10-03
Mitigating greenhouse gas (GHG) emissions in China's industrial sector is crucial for addressing climate change. We developed a vintage stock model to quantify the GHG mitigation potential and cost effectiveness in Chinese eco-industrial parks by targeting energy infrastructure with five key measures. The model, integrating energy efficiency assessments, GHG emission accounting, cost-effectiveness analyses, and scenario analyses, was applied to 548 units of energy infrastructure in 106 parks. The results indicate that two measures (shifting coal-fired boilers to natural gas-fired boilers and replacing coal-fired units with natural gas combined cycle units) present a substantial potential to mitigate GHGs (42%-46%) compared with the baseline scenario. The other three measures (installation of municipal solid waste-to-energy units, replacement of small-capacity coal-fired units with large units, and implementation of turbine retrofitting) present potential mitigation values of 6.7%, 0.3%, and 2.1%, respectively. In most cases, substantial economic benefits also can be achieved by GHG emission mitigation. An uncertainty analysis showed that enhancing the annual working time or serviceable lifetime levels could strengthen the GHG mitigation potential at a lower cost for all of the measures.
Implementation and evaluation of an automated dispensing system.
Schwarz, H O; Brodowy, B A
1995-04-15
An institution's experience in replacing a traditional unit dose cassette-exchange system with an automated dispensing system is described. A 24-hour unit dose cassette-exchange system was replaced with an automated dispensing system (Pyxis's Medstation Rx) on a 36-bed cardiovascular surgery unit and an 8-bed cardiovascular intensive care unit. Significantly fewer missing doses were reported after Medstation Rx was implemented. No conclusions could be made about the impact of the system on the reporting of medication errors. The time savings for pharmacy associated with the filling, checking, and delivery of new medication orders equated to about 0.5 full-time equivalent (FTE). Medstation Rx also saved substantial nursing time for acquisition of controlled substances and for controlled-substance inventory taking at shift changes. A financial analysis showed that Medstation Rx could save the institution about $1 million over five years if all personnel time savings could be translated into FTE reductions. The automated system was given high marks by the nurses in a survey; 80% wanted to keep the system on their unit. Pilot implementation of an automated dispensing system improved the efficiency of drug distribution over that of the traditional unit dose cassette-exchange system.
Ogiwara, Ikuo; Miya, Masaki; Ohshima, Kazuhiko; Okada, Norihiro
2002-01-01
We have identified a new superfamily of vertebrate short interspersed repetitive elements (SINEs), designated V-SINEs, that are widespread in fishes and frogs. Each V-SINE includes a central conserved domain preceded by a 5′-end tRNA-related region and followed by a potentially recombinogenic (TG)n tract, with a 3′ tail derived from the 3′ untranslated region (UTR) of the corresponding partner long interspersed repetitive element (LINE) that encodes a functional reverse transcriptase. The central domain is strongly conserved and is even found in SINEs in the lamprey genome, suggesting that V-SINEs might be ∼550 Myr old or older in view of the timing of divergence of the lamprey lineage from the bony fish lineage. The central conserved domain might have been subject to some form of positive selection. Although the contemporary 3′ tails of V-SINEs differ from one another, it is possible that the original 3′ tail might have been replaced, via recombination, by the 3′ tails of more active partner LINEs, thereby retaining retropositional activity and the ability to survive for long periods on the evolutionary time scale. It seems plausible that V-SINEs may have some function(s) that have been maintained by the coevolution of SINEs and LINEs during the evolution of vertebrates. [The sequences reported in this paper have been deposited in the DDBJ/GenBank database under accession nos. AB072981–AB073004. Supplemental figures are available online at http://www.genome.org.] PMID:11827951
Space shuttle main engine: Interactive design challenges
NASA Technical Reports Server (NTRS)
Mccarty, J. P.; Wood, B. K.
1985-01-01
The operating requirements established by NASA for the SSME were considerably more demanding than those for earlier rocket engines used in the military launch vehicles or Apollo program. The SSME, in order to achieve the high performance, low weight, long life, reusable objectives, embodied technical demands far in excess of its predecessor rocket engines. The requirements dictated the use of high combustion pressure and the staged combustion cycle which maximizes performance through total use of all propellants in the main combustion process. This approach presented a myriad of technical challenges for maximization of performance within attainable state of the art capabilities for operating pressures, operating temperatures and rotating machinery efficiencies. Controlling uniformity of the high pressure turbomachinery turbine temperature environment was a key challenge for thrust level and life capability demanding innovative engineering. New approaches in the design of the components were necessary to accommodate the multiple use, minimum maintenance objectives. Included were the use of line replaceable units to facilitate field maintenance automatic checkout and internal inspection capabilities.
Rapid Vortex Fluidics: Continuous Flow Synthesis of Amides and Local Anesthetic Lidocaine.
Britton, Joshua; Chalker, Justin M; Raston, Colin L
2015-07-20
Thin film flow chemistry using a vortex fluidic device (VFD) is effective in the scalable acylation of amines under shear, with the yields of the amides dramatically enhanced relative to traditional batch techniques. The optimized monophasic flow conditions are effective in ≤80 seconds at room temperature, enabling access to structurally diverse amides, functionalized amino acids and substituted ureas on multigram scales. Amide synthesis under flow was also extended to a total synthesis of local anesthetic lidocaine, with sequential reactions carried out in two serially linked VFD units. The synthesis could also be executed in a single VFD, in which the tandem reactions involve reagent delivery at different positions along the rapidly rotating tube with in situ solvent replacement, as a molecular assembly line process. This further highlights the versatility of the VFD in organic synthesis, as does the finding of a remarkably efficient debenzylation of p-methoxybenzyl amines. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
2011-05-09
CAPE CANAVERAL, Fla. -- In the Press Site auditorium at NASA's Kennedy Space Center in Florida, Space Shuttle Program Launch Integration Manager Mike Moses briefs media about the launch status of space shuttle Endeavour's STS-134 mission and announces a new launch date. Technicians replaced and tested the aft load control assembly-2 (ALCA-2) and wiring located in Endeavour's aft avionics bay 5. ALCA-2 distributes power to nine shuttle systems and is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt. Launch now is scheduled for May 16 at 8:56 a.m. EDT. Endeavour and its crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the station. This will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller
2011-04-29
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Public Affairs Officer George Diller, Kennedy Director Bob Cabana, Space Shuttle Program Launch Integration Manager Mike Moses and Shuttle Launch Director Mike Leinbach participate in a news conference following the April 29 scrubbed launch attempt of space shuttle Endeavour. During the STS-134 countdown, fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) failed. Technicians later discovered that the Load Control Assembly-2 (LCA-2), which distributes power to nine shuttle systems, was the cause of the failure reading. The LCA-2 located in Endeavour's aft section will be replaced and systems will be retested before the launch is rescheduled. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett
2011-05-09
CAPE CANAVERAL, Fla. -- In the Press Site auditorium at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach briefs media about the launch status of space shuttle Endeavour's STS-134 mission and announces a new launch date. Technicians replaced and tested the aft load control assembly-2 (ALCA-2) and wiring located in Endeavour's aft avionics bay 5. ALCA-2 distributes power to nine shuttle systems and is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt. Launch now is scheduled for May 16 at 8:56 a.m. EDT. Endeavour and its crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the station. This will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller
Investigation of alternate power source for Space Shuttle Orbiter hydraulic system
NASA Technical Reports Server (NTRS)
Simon, William E.; Young, Fred M.
1993-01-01
This investigation consists of a short-term feasibility study to determine whether or not an alternate electrical power source would trade favorably from a performance, reliability, safety, operation, and weight standpoint in replacing the current auxiliary power unit subsystems with its attendant components (water spray boiler, hydrazine fuel and tanks, feed and vent lines, controls, etc.), operating under current flight rules. Results of this feasibility study are used to develop recommendations for the next step (e.g., to determine if such an alternate electrical power source would show an advantage given that the current operational flight mode of the system could be modified in such a way as not to constrain the operational capability and safety of the vehicle). However, this next step is not within the scope of this investigation. This study does not include a cost analysis, nor does it include investigation of the integration aspects involved in such a trade, except in a qualitative sense for the determination of concept feasibility.
STS-111 Flight Day 2 Highlights
NASA Technical Reports Server (NTRS)
2002-01-01
On Flight Day 2 of STS-111, the crew of Endeavour (Kenneth Cockrell, Commander; Paul Lockhart, Pilot; Franklin Chang-Diaz, Mission Specialist; Philippe Perrin, Mission Specialist) and the Expedition 5 crew (Valery Korzun, Commander; Peggy Whitson, Flight Engineer; Sergei Treschev, Flight Engineer), having successfully entered orbit around the Earth, begin to maneuver towards the International Space Station (ISS), where the Expedition 5 crew will replace the Expedition 4 crew. Live video is shown of the Earth from several vantage points aboard the Shuttle. The center-line camera, which will allow Shuttle pilots to align the docking apparatus with that on the ISS, provides footage of the Earth. Chang-Diaz participates in an interview, in Spanish, conducted from the ground via radio communications, with Cockrell also appearing. Footage of the Earth includes: Daytime video of the Eastern United States with some cloud cover as Endeavour passes over the Florida panhandle, Georgia, and the Carolinas; Daytime video of Lake Michigan unobscured by cloud cover; Nighttime low-light camera video of Madrid, Spain.
Flight Hydrogen Sensor for use in the ISS Oxygen Generation Assembly
NASA Technical Reports Server (NTRS)
MSadoques, George, Jr.; Makel, Darby B.
2005-01-01
This paper provides a description of the hydrogen sensor Orbital Replacement Unit (ORU) used on the Oxygen Generation Assembly (OGA), to be operated on the International Space Station (ISS). The hydrogen sensor ORU is being provided by Makel Engineering, Inc. (MEI) to monitor the oxygen outlet for the presence of hydrogen. The hydrogen sensor ORU is a triple redundant design where each sensor converts raw measurements to actual hydrogen partial pressure that is reported to the OGA system controller. The signal outputs are utilized for system shutdown in the event that the hydrogen concentration in the oxygen outlet line exceeds the specified shutdown limit. Improvements have been made to the Micro-Electro-Mechanical Systems (MEMS) based sensing element, screening, and calibration process to meet OGA operating requirements. Two flight hydrogen sensor ORUs have successfully completed the acceptance test phase. This paper also describes the sensor s performance during acceptance testing, additional tests planned to extend the operational performance calibration cycle, and integration with the OGA system.
Kumar, Rashmi; Bach, Martina P; Mainoldi, Federica; Maruya, Mikako; Kishigami, Satoshi; Jumaa, Hassan; Wakayama, Teruhiko; Kanagawa, Osami; Fagarasan, Sidonia; Casola, Stefano
2015-02-03
In mammals, VDJ recombination is responsible for the establishment of a highly diversified preimmune antibody repertoire. Acquisition of a functional Ig heavy (H) chain variable (V) gene rearrangement is thought to prevent further recombination at the IgH locus. Here, we describe VHQ52(NT); Vκgr32(NT) Ig monoclonal mice reprogrammed from the nucleus of an intestinal IgA(+) plasma cell. In VHQ52(NT) mice, IgA replaced IgM to drive early B-cell development and peripheral B-cell maturation. In VHQ52(NT) animals, over 20% of mature B cells disrupted the single productive, nonautoimmune IgH rearrangement through VH replacement and exchanged it with a highly diversified pool of IgH specificities. VH replacement occurred in early pro-B cells, was independent of pre-B-cell receptor signaling, and involved predominantly one adjacent VH germ-line gene. VH replacement was also identified in 5% of peripheral B cells of mice inheriting a different productive VH rearrangement expressed in the form of an IgM H chain. In summary, editing of a productive IgH rearrangement through VH replacement can account for up to 20% of the IgH repertoire expressed by mature B cells.
Thermal Characterization of Adhesive
NASA Technical Reports Server (NTRS)
Spomer, Ken A.
1999-01-01
The current Space Shuttle Reusable Solid Rocket Motor (RSRM) nozzle adhesive bond system is being replaced due to obsolescence. Down-selection and performance testing of the structural adhesives resulted in the selection of two candidate replacement adhesives, Resin Technology Group's Tiga 321 and 3M's EC2615XLW. This paper describes rocket motor testing of these two adhesives. Four forty-pound charge motors were fabricated in configurations that would allow side by side comparison testing of the candidate replacement adhesives and the current RSRM adhesives. The motors provided an environment where the thermal performance of adhesives in flame surface bondlines was compared. Results of the FPC testing show that: 1) The phenolic char depths on radial bond lines is approximately the same and vary depending on the position in the blast tube regardless of which adhesive was used; 2) The adhesive char depth of the candidate replacement adhesives is less than the char depth of the current adhesives; 3) The heat-affected depth of the candidate replacement adhesives is less than the heat-affected depth of the current adhesives; and 4) The ablation rates for both replacement adhesives are slower than that of the current adhesives.
Influence of Miles City Line 1 on the United States Hereford Population
USDA-ARS?s Scientific Manuscript database
The goal of this research was to document the influence of Line 1 (L1) Hereford cattle developed by the United States Department of Agriculture at its research facility in Miles City, Montana, on the United States Hereford population. The L1 Hereford population originated in 1934 and has been therea...
Replacing intrusive thoughts: investigating thought control in relation to OCD symptoms.
Ólafsson, Ragnar P; Snorrason, Ívar; Bjarnason, Reynar K; Emmelkamp, Paul M G; Ólason, Daníel Þ; Kristjánsson, Árni
2014-12-01
Control of obsessive thoughts in Obsessive Compulsive Disorder (OCD) involves both avoidance and removal of undesirable intrusive thoughts. Thought suppression tasks tap both of these processes but experimental results have been inconsistent. Experimental tasks allowing more focused study of the processes involved in controlling intrusive thoughts may be needed. In two experiments, control over neutral, standardized intrusive and personal intrusive thoughts was investigated as participants attempted to replace them with neutral thoughts. Non-selected university students (Experiment 1: N = 61) and university students scoring high and low on self-report measure of OC symptoms (Experiment 2: N = 40) performed a computerized thought replacement task. In experiment 1 replacing personal intrusive thoughts took longer than replacing neutral thoughts. Self-reports showed that intrusive thoughts were rated more difficult to replace and were associated with greater thought reoccurrence during replacement, larger emotional reaction and more discomfort. These results were largely replicated in experiment 2. Furthermore, the high OC symptom group experienced greater overall difficulty controlling thoughts on the replacement task, experienced more reoccurrences of personal intrusive thoughts, larger emotional reactions and discomfort associated with them, and felt a greater urge to remove them. All participants were non-clinical university students, and older adults with OCD should be tested. The findings are in line with cognitive behavioural theories of OCD. They support the usefulness of thought replacement as a research paradigm to study thought control in OCD and possibly other psychological conditions characterized by repetitive thoughts. Copyright © 2014 Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Halsey, Steve
1996-01-01
A campus redesign at an urban university transforms its image to a more welcoming environment. Lecture halls that previously were covered with a contiguous plaza walkway system were uncovered. Ground-level paths, lined with trees, shrubs, and grass, replaced decaying asphalt pathways. (MLF)
Rolling contact fatigue : a comprehensive review.
DOT National Transportation Integrated Search
2011-11-01
"Rolling contact fatigue (RCF) is a pervasive and insidious problem on all types of railway systems. Although it is a dominant cause of maintenance and replacements on heavy haul rail lines, it is also a significant economic and safety challenge for ...
Overview of two story walkup flat type unit illustrating projecting ...
Overview of two story walk-up flat type unit illustrating projecting balconies and concrete stairways. Original pipe railings replaced by square tube railing. Building 26, view facing east - Harbor Hills Housing Project, Two Story Walk-Up Type, 26607 Western Avenue, Lomita, Los Angeles County, CA
NASA Astrophysics Data System (ADS)
Kopf, A.; Freudenthal, T.; Ratmeyer, V.; Bergenthal, M.; Renken, J.; Zabel, M.; Wefer, G.
2011-12-01
State of the art technology for long-term monitoring of fluid migration within the sea floor is the sealing of a borehole with a Circulation Obviation Retrofit Kit (CORK) after sensor installation and/or fluid sampling devices within the drill string. However, the combined used of a drilling vessels and a remotely operated drilling (ROV) required for a CORK installation in the deep sea is a costly exercise that limits the number of monitoring stations installed. Robotic sea floor drill rigs are a cost effective alternative for shallow drillings down to 50-100 m below sea floor. Here we present a Mini-CORK system that is developed for installation with the sea floor drill rig MeBo. This rig was developed at MARUM Research Centre, University of Bremen in 2005 and can sample the sea floor in water depths up to 2000 m. The MeBo is deployed on the seabed and remotely controlled from the vessel. All required drill tools for wire-line core drilling down to 70 m below sea floor are stored on two rotating magazines and can be loaded below the top drive drill head for assembling the drill string. For one of the upcoming cruises with RV Sonne offshore Japan (Nankai Trough accretionary prism), MeBo will be used for the first time to place observatories. Two different designs have been developed. The first, relatively simple long-term device resembles a MeBo drill rod in its geometry, and contains a pressure and temperature transducer in the borehole plus an identical pair of transducers for seafloor reference. The device also contains a data logger, battery unit, and an acoustic modem so that data can be downloaded at any time from a ship of opportunity. The key element at the base of the observatory rod is a seal at the conical thread to separate the borehole hydraulically from the overlying water body. It is realized by an adapter, which also contains a hotstab hydraulic connection and an electrical connection. The second observatory device is a seafloor unit, which replaces part of the first unit and which is deployed by ROV. In essence, the upper portion of the former observatory is taken away by ROV, and an umbilical containing hydraulic lines and tubing to withdraw formation water from the borehole is plugged into the hotstab female adapter by ROV. At the far end, the umbilical is connected to a seafloor unit with battery power, data logger, P and T transducers, and the same acoustic modem as the former one. In addition, the latter contains osmo samplers and biological chambers (FLOCS) for in situ sampling and experiments. After the envisaged deployment period, the entire unit is replaced while an identical one is prepared on deck and lowered from the vessel. In theory, the MeBo hole infinitely serves as an access to depth since no electronic, but only tubing is lowered into the (open) hole. In summary, long-term borehole installations with MeBo offer an affordable way to measure key physical properties over time and sample the formation fluids for geochemistry and microbiology (in case of the second, ROV-deployed CORK).
1993-07-01
Ruptured polybutylene pipe from Building 3858, Unit C 77 F20 Longitudinal hair line crack in PB pipe from Building 3802, Unit B 78 F21 Microscopic...of the 200 housing units used national standards in the unit construction which included the use of polybutylene ( PB ) piping. The piping was...in PB Pipe from Building 3802, Unit B Figure F 21: Microscopic View of Longitudinal Hair Line Crack 78 Figure F22: White Coating on Acetld Fitting
Giustiniano, Mariateresa; Pelliccia, Sveva; Galli, Ubaldina; Amato, Jussara; Travagin, Fabio; Novellino, Ettore; Tron, Gian Cesare
2016-11-18
Old multicomponent reactions are still a source of inspiration for discovering novel combinations of three or more reactants. A simple idea is to replace one of the educts of a known multicomponent reaction with another functional group and still be able to mimic the same reactivity. Following this line of thought, we report a three-component reaction in which isocyanides are able to open the epoxide intermediate of the Bargellini reaction affording 3-carboxamido-isobutyric acids in yields of 47-95%.
2014-09-10
Cr-Mo, and stainless steel have to some extent found acceptance in various military and commercial CuBe-replacement roles. 1.1.2 Proposed...including low and high strength steels , stainless steel , Inconel and nickel. Figure 4-8 Activation line used to prepare components for nCoP plating...size up to a maximum thickness of 0.012”, can be produced in the tank by electroforming onto a flat stainless steel mandrel and subsequently
Parametric Mass Reliability Study
NASA Technical Reports Server (NTRS)
Holt, James P.
2014-01-01
The International Space Station (ISS) systems are designed based upon having redundant systems with replaceable orbital replacement units (ORUs). These ORUs are designed to be swapped out fairly quickly, but some are very large, and some are made up of many components. When an ORU fails, it is replaced on orbit with a spare; the failed unit is sometimes returned to Earth to be serviced and re-launched. Such a system is not feasible for a 500+ day long-duration mission beyond low Earth orbit. The components that make up these ORUs have mixed reliabilities. Components that make up the most mass-such as computer housings, pump casings, and the silicon board of PCBs-typically are the most reliable. Meanwhile components that tend to fail the earliest-such as seals or gaskets-typically have a small mass. To better understand the problem, my project is to create a parametric model that relates both the mass of ORUs to reliability, as well as the mass of ORU subcomponents to reliability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jagadeesan, G.; Malathy, P.; Gunasekaran, K.
2014-10-25
The great cormorant hemoglobin has been isolated, purified and crystallized and the three dimensional structure is solved using molecular replacement technique. Haemoglobin is the iron-containing oxygen-transport metalloprotein that is present in the red blood cells of all vertebrates. In recent decades, there has been substantial interest in attempting to understand the structural basis and functional diversity of avian haemoglobins. Towards this end, purification, crystallization, preliminary X-ray diffraction and molecular-replacement studies have been carried out on cormorant (Phalacrocorax carbo) haemoglobin. Crystals were grown by the hanging-drop vapour-diffusion method using PEG 3350, NaCl and glycerol as precipitants. The crystals belonged to themore » trigonal system P3{sub 1}21, with unit-cell parameters a = b = 55.64, c = 153.38 Å, β = 120.00°; a complete data set was collected to a resolution of 3.5 Å. Matthews coefficient analysis indicated that the crystals contained a half-tetramer in the asymmetric unit.« less
Panoramic projection avionics displays
NASA Astrophysics Data System (ADS)
Kalmanash, Michael H.
2003-09-01
Avionics projection displays are entering production in advanced tactical aircraft. Early adopters of this technology in the avionics community used projection displays to replace or upgrade earlier units incorporating direct-view CRT or AMLCD devices. Typical motivation for these upgrades were the alleviation of performance, cost and display device availability concerns. In these systems, the upgraded (projection) displays were one-for-one form / fit replacements for the earlier units. As projection technology has matured, this situation has begun to evolve. The Lockheed-Martin F-35 is the first program in which the cockpit has been specifically designed to take advantage of one of the more unique capabilities of rear projection display technology, namely the ability to replace multiple small screens with a single large conformal viewing surface in the form of a panoramic display. Other programs are expected to follow, since the panoramic formats enable increased mission effectiveness, reduced cost and greater information transfer to the pilot. Some of the advantages and technical challenges associated with panoramic projection displays for avionics applications are described below.
Parallel Fin ORU Thermal Interface for space applications. [Orbital Replaceable Unit
NASA Technical Reports Server (NTRS)
Stobb, C. A.; Limardo, Jose G.
1992-01-01
The Parallel Fin Thermal Interface has been developed as an Orbital Replaceable Unit (ORU) interface. The interface transfers heat from an ORU baseplate to a Heat Acquisition Plate (HAP) through pairs of fins sandwiched between insert plates that press against the fins with uniform pressure. The insert plates are spread apart for ORU baseplate separation and replacement. Two prototype interfaces with different fin dimensions were built (Model 140 and 380). Interfacing surface samples were found to have roughnesses of 56 to 89 nm. Conductance values of 267 to 420 W/sq m C were obtained for the 140 model in vacuum with interface pressures of 131 to 262 kPa (19 to 38 psi). Vacuum conductances ranging from 176 to 267 W/sq m F were obtained for the 380 model at interface pressures of 97 to 152 kPa (14 and 22 psi). Correlations from several sources were found to agree with test data within 20 percent using thermal math models of the interfaces.
Persaud, Shanta J; Arden, Catherine; Bergsten, Peter; Bone, Adrian J; Brown, James; Dunmore, Simon; Harrison, Moira; Hauge-Evans, Astrid; Kelly, Catriona; King, Aileen; Maffucci, Tania; Marriott, Claire E; McClenaghan, Neville; Morgan, Noel G; Reers, Christina; Russell, Mark A; Turner, Mark D; Willoughby, Emma; Younis, Mustafa Y G; Zhi, Z L; Jones, Peter M
2010-01-01
Laboratory-based research aimed at understanding processes regulating insulin secretion and mechanisms underlying β-cell dysfunction and loss in diabetes often makes use of rodents, as these processes are in many respects similar between rats/mice and humans. Indeed, a rough calculation suggests that islets have been isolated from as many as 150,000 rodents to generate the data contained within papers published in 2009 and the first four months of 2010. Rodent use for islet isolation has been mitigated, to a certain extent, by the availability of a variety of insulin-secreting cell lines that are used by researchers world-wide. However, when maintained as monolayers the cell lines do not replicate the robust, sustained secretory responses of primary islets which limits their usefulness as islet surrogates. On the other hand, there have been several reports that configuration of MIN6 β-cells, derived from a mouse insulinoma, as three-dimensional cell clusters termed ‘pseudoislets’ largely recapitulates the function of primary islet β-cells. The Diabetes Research Group at King’s College London has been using the MIN6 pseudoislet model for over a decade and they hosted a symposium on “Pseudoislets as primary islet replacements for research”, which was funded by the UK National Centre for the Replacement, Refinement and Reduction of Animals in Research (NC3Rs), in London on 15th and 16th April 2010. This small, focused meeting was conceived as an opportunity to consolidate information on experiences of working with pseudoislets between different UK labs, and to introduce the theory and practice of pseudoislet culture to laboratories working with islets and/or β-cell lines but who do not currently use pseudoislets. This short review summarizes the background to the development of the cell line-derived pseudoislet model, the key messages arising from the symposium and emerging themes for future pseudoislet research.
Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays
NASA Astrophysics Data System (ADS)
Marchiori, G.; Formentin, F.; Rampini, F.
2014-07-01
In the last years, EIE GROUP has been more and more involved in large optical telescopes and radio antennas array projects. In this frame, the paper describes a fundamental aspect of the Logistic Support Analysis (LSA) process, that is the application of the Reliability-Centered Maintenance (RCM) methodology for the generation of maintenance plans for ground-based large optical telescopes and radio antennas arrays. This helps maintenance engineers to make sure that the telescopes continue to work properly, doing what their users require them to do in their present operating conditions. The main objective of the RCM process is to establish the complete maintenance regime, with the safe minimum required maintenance, carried out without any risk to personnel, telescope and subsystems. At the same time, a correct application of the RCM allows to increase the cost effectiveness, telescope uptime and items availability, and to provide greater understanding of the level of risk that the organization is managing. At the same time, engineers shall make a great effort since the initial phase of the project to obtain a telescope requiring easy maintenance activities and simple replacement of the major assemblies, taking special care on the accesses design and items location, implementation and design of special lifting equipment and handling devices for the heavy items. This maintenance engineering framework is based on seven points, which lead to the main steps of the RCM program. The initial steps of the RCM process consist of: system selection and data collection (MTBF, MTTR, etc.), definition of system boundaries and operating context, telescope description with the use of functional block diagrams, and the running of a FMECA to address the dominant causes of equipment failure and to lay down the Critical Items List. In the second part of the process the RCM logic is applied, which helps to determine the appropriate maintenance tasks for each identified failure mode. Once the logic is completed for all the analyzed items, the resulting Maintenance Program is compiled in order to preserve all the system important functions and to rationalize the tasks periodicities. Lastly, the RCM is kept alive throughout the entire life of the telescope, where the effectiveness of the maintenance is constantly reviewed and adjusted on the basis of the "lesson learned". In addition to the RCM analysis methodology, a second basic concept is applied for the telescope maintenance: to design and install components in such a manner to restore a failure and to perform servicing procedures as close as possible to the telescope, maximizing the replacement of Line Replaceable Units (LRUs) or Shop Replaceable Units (SRUs), rather than repair on-equipment.
NASA Technical Reports Server (NTRS)
Kaminski, Charles F., Jr.
1999-01-01
A small project to compile remote sensing and in-site data to review the processes leading to the May 1998 Mexican/Central American fires was undertaken. A web page based on this project was assembled. The second project initiated involved an interactive and on-line program that will replace the paper version of the Earth Observations Preflight Training Manual. Technical support was provided to Prof. Marvin Glasser as needed.
In brief: the (molecular) pathogenesis of Barrett's oesophagus.
Aichler, Michaela; Walch, Axel
2014-03-01
Barrett's oesophagus is a metaplastic change, such that the normal squamous epithelial lining of the oesophagus is replaced by specialized columnar-lined epithelium. Barrett's oesophagus is clinically significant and has a high health economic impact as it is associated with heightened risk of progression to oesophageal adenocarcinoma. This review discusses the pathogenesis of Barrett's oesophagus with an emphasis on the underlying molecular events. Copyright © 2013 Pathological Society of Great Britain and Ireland. Published by John Wiley & Sons, Ltd.
Birrell, F.; Johnell, O.; Silman, A.
1999-01-01
OBJECTIVES—To estimate the requirement for total hip replacement in the United Kingdom over the next three decades METHODS—Projection of age and sex specific hip replacements in the UK over 10 year intervals taking account of demographic change and the extrapolation of arthroplasty rates from Sweden; a country with recently introduced guidelines. RESULTS—Assuming no change in the age and sex specific arthroplasty rates, the estimated number of hip replacements will increase by 40% over the next 30 year period because of demographic change alone. The proportionate change will be substantially higher in men (51%) than women (33%), with a doubling of the number of male hip replacements in those aged over 85. Changes in the threshold for surgery may increase this further—up to double the current number. CONCLUSION—A sharp rise in hip replacements will be needed to satisfy needs in the UK population over the next 30 years. PMID:10460191
Safety of nicotine replacement therapy in critically ill smokers: a retrospective cohort study.
Kerr, A; McVey, J T; Wood, A M; Van Haren, Fmp
2016-11-01
Nicotine replacement therapy (NRT) is a common first-line treatment to prevent nicotine withdrawal in smokers. However, available literature reports conflicting results regarding its efficacy and safety in critically ill patients. The objective of this study was to evaluate the relationship between NRT in smokers in the intensive care unit (ICU) and outcomes. This case-control study was conducted in a university-affiliated tertiary hospital ICU. Over a period of five years, 126 active smokers who received transdermal NRT were matched to 126 active smokers who did not receive NRT. The groups were case-matched for sex, age and Acute Physiology and Chronic Health Evaluation II (APACHE II) score. The primary outcome was administration of antipsychotic medication. Secondary outcomes included use of physical restraints, 30-day mortality, and ventilation requirements. Antipsychotic medication was prescribed in 43 (34.1%) patients who received NRT compared to 14 (11.1%) in controls ( P <0.01). Physical restraints were used in 37 (29.4%) patients who received NRT, compared to 12 (9.5%) of controls ( P <0.01). The 30-day mortality and number of patients intubated was not statistically different between groups. Average length of intubation time was greater in the NRT group (2.56 days; standard deviation 4.16) compared to the control group (1.44 days; standard deviation 2.68) ( P =0.012). The use of NRT to prevent nicotine withdrawal in ICU patients is associated with increased use of antipsychotic medication and physical restraint, and with prolonged mechanical ventilation.
Iarustovskiĭ, M B; Stupchenko, O S; Abramian, M V; Nazarova, E I; Popok, Z V
2010-01-01
End-stage of chronic renal failure (CRF) is frequently associated with cardiac and vascular comorbidities requiring cardiosurgical interventions. Over 9 years, from 2000 to 2009, the A. N. Bakulev Research Center of Cardiovascular Surgery, Russian Academy of Medical Sciences, delivered cardiosurgical care to 16 patients aged 20 to 74 years with end-stage CRF. The duration of programmed hemodialysis was 1 to 102 months. The preoperative patient preparation protocol comprised correction of anemia, hypoproteinemia, hypertension, and water-electrolyte and acid-base balances. Five patients underwent endovascular myocardial revascularization; open heart surgery was performed in one patient. Interventions under extracorporeal circulation were made in 10 other patients. Ultrafiltration was intraoperatively carried out. On-line hemodiafiltration was performed following coronary artery stenting. After open operations, renal replacement therapy (first hemodiafiltration, then hemodialysis) as daily sessions was initiated on day 2 and, when the patients were transferred to intensive care units, it was performed by the programmed hemodialysis protocol. There were no fatal outcomes at the follow-up. The key aspects of treatment success achievement and improved quality of life in patients on programmed hemodialysis are the detection of cardiovascular diseases requiring surgery, the timely referral of the patients to a cardiosurgical hospital, the meticulous pre- and perioperative management (correction of anemia, hypoproteinemia, water-electrolyte balance, use of ultrafiltration and the adequate rate of perfusion at the stage of extracorporeal circulation, and daily renal replacement therapy in the postoperative period), and continuity in the work of all specialists.
ERIC Educational Resources Information Center
Population Reference Bureau, Inc., Washington, DC.
This poster-size data sheet presents population estimates and selected demographic indicators for the nation's 281 metropolitan areas. These areas are divided into 261 Metropolitan Statistical Areas (MSAs) and 20 Consolidated Metropolitan Statistical Areas (CMSAs), reporting units which replace the Standard Metropolitan Statistical Areas (SMSAs)…
2012-12-04
CAPE CANAVERAL, Fla. -- Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers have prepared the orbital replacement unit for the space station's main bus switching unit to be placed in a shipping container. The unit, which was processed at Kennedy, will be shipped to Japan at the beginning of the year for the HTV-4 launch, which is currently scheduled for 2013. Photo credit: NASA/Charisse Nahser
2012-12-04
CAPE CANAVERAL, Fla. -- Workers inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida prepare to pack the orbital replacement unit for the space station's main bus switching unit in a shipping container. The unit, which was processed at Kennedy, will be shipped to Japan at the beginning of the year for the HTV-4 launch, which is currently scheduled for 2013. Photo credit: NASA/Charisse Nahser
2012-12-04
CAPE CANAVERAL, Fla. -- Workers inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida prepare to pack the orbital replacement unit for the space station's main bus switching unit in a shipping container. The unit, which was processed at Kennedy, will be shipped to Japan at the beginning of the year for the HTV-4 launch, which is currently scheduled for 2013. Photo credit: NASA/Charisse Nahser
The United States Army’s Full-Spectrum Training Strategy Challenge
2012-05-17
the high operational tempo for deployed and deploying units. Soldiers and units conducted repeat deployments to both Iraq and Afghanistan with little...prevalent in Strategic Operational Design and associated variations of design. Further complicating Israeli ideas of warfare was the notion that...Army to develop an overarching operational framework that finally replaces Airland Battle, like EBO or some variation of operational design. But one
Dynamic analysis and vibration testing of CFRP drive-line system used in heavy-duty machine tool
NASA Astrophysics Data System (ADS)
Yang, Mo; Gui, Lin; Hu, Yefa; Ding, Guoping; Song, Chunsheng
2018-03-01
Low critical rotary speed and large vibration in the metal drive-line system of heavy-duty machine tool affect the machining precision seriously. Replacing metal drive-line with the CFRP drive-line can effectively solve this problem. Based on the composite laminated theory and the transfer matrix method (TMM), this paper puts forward a modified TMM to analyze dynamic characteristics of CFRP drive-line system. With this modified TMM, the CFRP drive-line of a heavy vertical miller is analyzed. And the finite element modal analysis model of the shafting is established. The results of the modified TMM and finite element analysis (FEA) show that the modified TMM can effectively predict the critical rotary speed of CFRP drive-line. And the critical rotary speed of CFRP drive-line is 20% higher than that of the original metal drive-line. Then, the vibration of the CFRP and the metal drive-line were tested. The test results show that application of the CFRP drive shaft in the drive-line can effectively reduce the vibration of the heavy-duty machine tool.
Quentzel, H L; Nadelman, R B; Ng, J; Wormser, G P
1989-01-01
Over the next few years, le Système international d'Unités or SI units may replace the presently used metric system in reporting laboratory data. The change to SI units will likely result in some confusion among clinicians who are not well versed in the new system. Application of SI units to the clinical practice of infectious diseases is discussed, including changes in drug dosages, serum drug levels, and minimum inhibitory concentrations. A table is presented to facilitate conversion of metric units to SI units and vice versa.
75 FR 27385 - Petition for Waiver of Compliance
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-14
... identifying mark, type of car, year built, number of windows and the estimated replacement glazing cost for...'s arguments in favor of relief. United Railroad Historical Society of New Jersey [Docket Number FRA-2010-0079] The United Railroad Historical Society of New Jersey (URHS) of Jackson, New Jersey, has...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
...-diameter lateral pipeline to connect the Douglas Meter Station to EPNG's existing Line No. 2164; Replacement of compressor modules and station yard piping at the existing Willcox Compressor Station; [[Page 26540
Town Flush with Benefits from New Water System
An EPA-funded project to replace the aging and undersized water lines in a Virginia town has transformed the community–providing cost savings, improved water quality and greater public safety, while eliminating leaks that drained half of the town' water.
Aging changes in organs - tissue - cells
... usually occurs to compensate for a loss of cells. It allows some organs and tissues to regenerate, including the skin, lining of the intestines, liver, and bone marrow. The liver is especially good at regeneration. It can replace up to 70% of its ...
Nongrayness Effects in Wolf-Rayet Wind Momentum Deposition
NASA Astrophysics Data System (ADS)
Onifer, A. J.; Gayley, K. G.
2004-05-01
Wolf-Rayet winds are characterized by their large momentum fluxes and optically thick winds. A simple analytic approach that helps to understand the most critical processes is the effecively gray approximation, but this has not been generalized to more realistic nongray opacities. We have developed a simplified theory for describing the interaction of the stellar flux with nongray wind opacity. We replace the detailed line list with a set of statistical parameters that are sensitive to the line strengths as well as the wavelength distribution of lines. We determine these statistical parameters for several real line lists, exploring the effects of temperature and density changes on the efficiency of momentum driving relative to gray opacity. We wish to acknowledge NSF grant AST-0098155.
ARRANGEMENT FOR REPLACING FILTERS
Blomgren, R.A.; Bohlin, N.J.C.
1957-08-27
An improved filtered air exhaust system which may be continually operated during the replacement of the filters without the escape of unfiltered air is described. This is accomplished by hermetically sealing the box like filter containers in a rectangular tunnel with neoprene covered sponge rubber sealing rings coated with a silicone impregnated pneumatic grease. The tunnel through which the filters are pushed is normal to the exhaust air duct. A number of unused filters are in line behind the filters in use, and are moved by a hydraulic ram so that a fresh filter is positioned in the air duct. The used filter is pushed into a waiting receptacle and is suitably disposed. This device permits a rapid and safe replacement of a radiation contaminated filter without interruption to the normal flow of exhaust air.
Al Refai, Roa'a; Saker, Samah
2018-01-01
The expected length of service and reasons for fixed dental prostheses (FDPs) replacement are a frequent inquiry by patients while the answers were mainly based on studies reports that was conducted outside the middle east region. This clinical and radiographic survey was constructed to assess and survey clinically and radiographically the reasons of replacement of metal-ceramic fixed dental prostheses, amongst patients reporting at dental school in Taibah University. Between January and May 2016, 151 patients were recruited for this study. Interview (include questions pertained to the length of service of the prosthesis, the nature of complaint as told by patient in her own words), clinical examination, intra-oral photographs, and periapical radiographs, were done by the researchers. The parameters assessed were secondary caries, open margins, loss of retention, failure of endodontic treatment of the abutment and periodontal diseases. A total number of 249 failed fixed dental prostheses were evaluated. Of which 180 (39.7%) were single crowns, 159 (35.0%) were retainers and 117 (25.8%) were pontics in 69 fixed partial denture. The most common reason for replacement of fixed restorations was periodontal diseases affecting 92.8% of all types' restorations, followed by defective margin in 90.4% of examined restoration, poor aesthetic in 88% of restorations, while periapical involvement was found in 85.5% of fixed dental prosthesis. The survival rates of fixed prostheses were not predictable, and no association was found between number of years in service and the number of restorations. The most common reasons for replacing single unit fixed dental prostheses are periodontal diseases and periapical involvement, while defective margins and poor aesthetic mainly associated with multi-unit fixed dental prostheses. Key words: Failure, Fixed dental prosthesis, Survival, Replacement.
Genetic loci simultaneously controlling lignin monomers and biomass digestibility of rice straw.
Hu, Zhen; Zhang, Guifen; Muhammad, Ali; Samad, Rana Abdul; Wang, Youmei; Walton, Jonathan D; He, Yuqing; Peng, Liangcai; Wang, Lingqiang
2018-02-26
Lignin content and composition are crucial factors affecting biomass digestibility. Exploring the genetic loci simultaneously affecting lignin-relevant traits and biomass digestibility is a precondition for lignin genetic manipulation towards energy crop breeding. In this study, a high-throughput platform was employed to assay the lignin content, lignin composition and biomass enzymatic digestibility of a rice recombinant inbred line population. Correlation analysis indicated that the absolute content of lignin monomers rather than lignin content had negative effects on biomass saccharification, whereas the relative content of p-hydroxyphenyl unit and the molar ratio of p-hydroxyphenyl unit to guaiacyl unit exhibited positive roles. Eight QTL clusters were identified and four of them affecting both lignin composition and biomass digestibility. The additive effects of clustered QTL revealed consistent relationships between lignin-relevant traits and biomass digestibility. Pyramiding rice lines containing the above four positive alleles for increasing biomass digestibility were selected and showed comparable lignin content, decreased syringyl or guaiacyl unit and increased molar percentage of p-hydroxyphenyl unit, the molar ratio of p-hydroxyphenyl unit to guaiacyl unit and sugar releases. More importantly, the lodging resistance and eating/cooking quality of pyramiding lines were not sacrificed, indicating the QTL information could be applied to select desirable energy rice lines.
2012-04-18
ISS030-E-236919 (18 April 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, works with the Oxygen Generator System (OGS) rack in the Tranquility node of the International Space Station. Burbank unpowered the OGS, purged the hydrogen sensor Orbital Replacement Unit (ORU) with the Hydrogen Sensor ORU Purge Adapter (HOPA) for return to Earth, and replaced the hydrogen sensor with a new spare, then cleaned the rack Avionics Air Assembly (AAA).
A Procedure for Determining the Resource Utilization Potential of Coal Ash.
1981-09-01
48 V Chapter Page Lime Replacement for Flue - Gas Desulfurization Ujnits . .. .. .. .. .. .. .. .. .. .. . .48 Refuse Pile Fire Abatemnent...exceeds the capability of a vacuum system to attain a satisfactory conveying rate. If thenfy ash is removed from the flue gas stream by a wet collector...the mixture some fertilizer value (21:44-45). Lime Replacement for Flue - Gas Desulfurization Units For conventional SO, lime-based removal systems
Caron, Angelo Luis; Biaggio, Rafael Tagé; Swiech, Kamilla
2018-01-01
Serum-free suspension cultures are preferably required for recombinant protein production due to its readiness in upstream/downstream processing and scale-up, therefore increasing process productivity and competitiveness. This type of culture replaces traditional cell culturing as the presence of animal-derived components may introduce lot-a-lot variability and adventitious pathogens to the process. However, adapting cells to serum-free conditions is challenging, time-consuming, and cell line and medium dependent. In this chapter, we present different approaches that can be used to adapt mammalian cell lines from an anchorage-dependent serum supplemented culture to a suspension serum-free culture.
High Maturity Is Not a Procrustean Bed
2014-07-01
older legacy system or set of systems Brownfield modernization Incremental replacement of old, fragile business systems with COTS products or...platform • Family of systems or product line • System of systems (SoS) or enterprise-wide system • Brownfield modernization Table 2 briefly
Mineralogical Evidence of Galvanic Corrosion in Domestic, Drinking Water Pipes
Drinking water distribution system (DWDS) piping contains numerous examples of galvanically-coupled metals (e.g., soldered copper pipe joints, copper-lead pipes joined during partial replacements of lead service lines). The possible role of galvanic corrosion in the release of l...
Chondroid Metaplasia in a Fibroepithelial Polyp of Gingiva
Campos, Paola; Paramo, Juan Ignacio; Fuente, Javier De La; Pérez, Nancy
2016-01-01
Gingival masses are commonly encountered in clinical practice and can be a result of many conditions one of them could be metaplasia. Metaplasia is defined as the replacement of the lining of an organ with the type of lining normally found at another site. We are reporting a case of a 17-year-old Mexican male who presented with a pedunculated nodule associated to maxillary anterior gingiva. The histopatological examination revealed a chondroid material covered by stratified squamous epithelium and was diagnosed as chondroid metaplasia. PMID:27790592
A Note on the Geometry of Kullback-Leibler Information Numbers.
1983-04-01
distributions, certain analogies exist between the properties of distributions and Zaclidean *’ geometry. Zn particular, he proved an analogue of Pythagoras ...8217 theorem . Zn this note we extend these geometrical properties by defining the "shortest line" between two distributions and the "aid-pointu of the line...P,R) A similar result holds if both signs are replaced with U signs. 4. Main reslts We •oa pcyv our main theorem , which says that the romential
26. Generator Voltage Regulator Cabinet Exterior for Unit 1, view ...
26. Generator Voltage Regulator Cabinet Exterior for Unit 1, view to the northwest. The exciter supplies the DC current to the generator rotor to create electricity. Each of the four original units has an exciter identical to this one, and all are scheduled for replacement. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
2016-11-01
FilmArray system. 15. SUBJECT TERMS BioFire FilmArray system Dry Filter Unit (DFU) Joint Biological...collectors, such as the Dry Filter Unit (DFU). The FilmArray system showed enormous potential to rapidly screen samples for a wide range of biological...specific focus on the efficient implementation of environmental detectors and collectors, such as Dry Filter Units (DFUs). The JUPITR ATD members
Management of the patient with a total joint replacement: the primary care practitioner's role.
Palmer, L M
1999-01-01
The primary care practitioner assumes chief responsibility for patients with arthritis. More than 40 million Americans experience some form of arthritis. Management of the patient with arthritis may include a referral to an orthopedic surgeon for surgical intervention. As estimated, up to 500,000 total joint replacement procedures are performed by orthopedic surgeons each year in the United States. Presurgical evaluation for a total joint replacement is imperative to ensure that the patient can safely undergo this surgical procedure. Postsurgical care of a patient with total joint replacement involves coordinating care with the physical therapist and orthopedic surgeon to ensure adequate follow-through with the recommended rehabilitation program, prophylactic antibiotic coverage, and observation for any complications including infection, deep-vein thrombosis, or loosening of the total-joint prosthesis.
DOT National Transportation Integrated Search
2005-12-15
The annual revision of the Waterborne : Transportation Lines of the United States : (WTLUS) contains summary information of : the vessel companies and their American : flag vessels operating or available for : operation on 31 December 2004 including ...
Contemporary Fertility Patterns and First-Birth Timing among Mexican-Origin Women
ERIC Educational Resources Information Center
Batson, Christie D.
2013-01-01
This article examines first-birth timing among Mexican women in the United States over two birth cohorts. Currently, Mexican women are one of a small group that maintains above-replacement fertility in the United States, contributing to both Mexican population growth and overall national population growth. Yet, the fertility timing of Mexican…
The 1956 Suez Crisis and the United Nations
2004-06-17
formally given them the “ scarlet letter.” He then proceeds to describe the crisis as “the first time that permanent members of the Security Council had...less fanfare. Jubilant crowds of Egyptians replaced them. By midday on 23 December, the merriment reached a fevered pitch when units of the “defeated
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... restricted area established around the AUSTAL, USA shipbuilding facility located in Mobile, Alabama. The Supervisor of Shipbuilding, Conversion and Repair, United States Navy (USN), Gulf Coast (SUPSHIP Gulf Coast..., 2011, replacing the Supervisor of Shipbuilding, Conversion, and Repair, USN, Bath (SUPSHIP Bath). The...
76 FR 17362 - Airworthiness Directives; Bombardier, Inc. Model DHC-8-400 Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-29
... elevator power control units (PCUs) where the shaft (tailstock) swaged bearing liners had shown a higher... on the elevator power control units (PCUs) where the shaft (tailstock) swaged bearing liners had...-play check of the shaft swaged bearing installed in the elevator PCU tailstock end and replacement of...
42 CFR 409.87 - Blood deductible.
Code of Federal Regulations, 2012 CFR
2012-10-01
... after plasma is separated from whole blood. (2) A unit of packed red cells is treated as the equivalent...) Exception. The beneficiary is not responsible for the first 3 units of whole blood or packed red cells if.... In that case, the blood or red cells is deemed to have been replaced. (c) Provider's right to charge...
42 CFR 409.87 - Blood deductible.
Code of Federal Regulations, 2011 CFR
2011-10-01
... after plasma is separated from whole blood. (2) A unit of packed red cells is treated as the equivalent...) Exception. The beneficiary is not responsible for the first 3 units of whole blood or packed red cells if.... In that case, the blood or red cells is deemed to have been replaced. (c) Provider's right to charge...
42 CFR 409.87 - Blood deductible.
Code of Federal Regulations, 2014 CFR
2014-10-01
... after plasma is separated from whole blood. (2) A unit of packed red cells is treated as the equivalent...) Exception. The beneficiary is not responsible for the first 3 units of whole blood or packed red cells if.... In that case, the blood or red cells is deemed to have been replaced. (c) Provider's right to charge...
42 CFR 409.87 - Blood deductible.
Code of Federal Regulations, 2013 CFR
2013-10-01
... after plasma is separated from whole blood. (2) A unit of packed red cells is treated as the equivalent...) Exception. The beneficiary is not responsible for the first 3 units of whole blood or packed red cells if.... In that case, the blood or red cells is deemed to have been replaced. (c) Provider's right to charge...
Recent progress in continuous and semi-continuous processing of solid oral dosage forms: a review.
Teżyk, Michał; Milanowski, Bartłomiej; Ernst, Andrzej; Lulek, Janina
2016-08-01
Continuous processing is an innovative production concept well known and successfully used in other industries for many years. The modern pharmaceutical industry is facing the challenge of transition from a traditional manufacturing approach based on batch-wise production to a continuous manufacturing model. The aim of this article is to present technological progress in manufacturing based on continuous and semi-continuous processing of the solid oral dosage forms. Single unit processes possessing an alternative processing pathway to batch-wise technology or, with some modification, an altered approach that may run continuously, and are thus able to seamlessly switch to continuous manufacturing are briefly presented. Furthermore, the concept of semi-continuous processing is discussed. Subsequently, more sophisticated production systems created by coupling single unit processes and comprising all the steps of production, from powder to final dosage form, were reviewed. Finally, attempts of end-to-end production approach, meaning the linking of continuous synthesis of API from intermediates with the production of final dosage form, are described. There are a growing number of scientific articles showing an increasing interest in changing the approach to the production of pharmaceuticals in recent years. Numerous scientific publications are a source of information on the progress of knowledge and achievements of continuous processing. These works often deal with issues of how to modify or replace the unit processes in order to enable seamlessly switching them into continuous processing. A growing number of research papers concentrate on integrated continuous manufacturing lines in which the production concept of "from powder to tablet" is realized. Four main domains are under investigation: influence of process parameters on intermediates or final dosage forms properties, implementation of process analytical tools, control-managing system responsible for keeping continuous materials flow through the whole manufacturing process and the development of new computational methods to assess or simulate these new manufacturing techniques. The attempt to connect the primary and secondary production steps proves that development of continuously operating lines is possible. A mind-set change is needed to be able to face, and fully assess, the advantages and disadvantages of switching from batch to continuous mode production.
Breast carcinoma with a predominant duct-replacing component and chondroid matrix production.
Tajima, Shogo; Koda, Kenji
2016-12-01
Breast carcinomas that produce chondroid matrix are extremely rare. If the carcinoma is invasive, it is classified as a matrix-producing carcinoma (MPC). Herein, we present a case of a breast carcinoma, which showed duct-replacing growth with chondroid matrix production. A 63-year-old woman underwent fine needle aspiration cytology for suspected malignancy, based on radiological findings. Cellular components showed sufficient atypia to allow a diagnosis of malignancy. A partial mastectomy was performed, and no mass-forming lesion was apparent in the surgically resected specimen. Histopathological examination showed that the carcinoma produced chondroid matrix and grew replacing ducts, which were associated with a small amount of an obvious invasive component without matrix production. Some parts of the duct-replacing component might take the form of expansile invasion due to the absence of residual duct-lining myoepithelial cells; it is difficult to decide whether the duct-replacing component is invasive or not. However, regarding a few tumor nests, they would be recognized as MPC-like intraductal components because of the focal presence of myoepithelial cells around them. Hence, this carcinoma could not be definitely diagnosed as a MPC, even though we believe they are closely related. This is the first reported case of a breast carcinoma displaying duct-replacing growth with chondroid matrix production.
STS-82 Discovery payloads being integrated in VPF
1997-01-30
KENNEDY SPACE CENTER, FLORIDA STS-82 PREPARATIONS VIEW --- Payload processing workers in the Kennedy Space Center (KSC) Vertical Processing Facility (VPF) prepare to integrate the Space Telescope Imaging Spectrograph (STIS), suspended at center, into the Orbiter Replacement Unit (ORU) Carrier and Scientific Instrument Protective Enclosure (SIPE). STIS will replace the Goddard High Resolution Spectrograph (GHRS) on the Hubble Space Telescope (HST). Four of the seven STS-82 crew members will perform a series of spacewalks to replace two scientific instruments with two new instruments, including STIS, and perform other tasks during the second HST servicing mission. HST was deployed nearly seven years ago and was initially serviced in 1993.
Implementation of a timed, electronic, assessment-driven potassium-replacement protocol.
Zielenski, Christopher; Crabtree, Adam; Le, Tien; Marlatt, Alyse; Ng, Dana; Tran, Alan
2017-06-15
The adherence to and effectiveness and safety of a timed, electronic, assessment-driven potassium-replacement protocol (TARP) were compared with an electronic nurse-driven replacement protocol (NRP) are reported. A retrospective observational study was conducted in a community hospital evaluating protocol adherence, effectiveness, and safety for 2 potassium-replacement protocols. All adults on medical units with an order for potassium replacement per protocol during the 3-month trial periods were reviewed. All patients requiring potassium replacement per protocol were included in the analysis. Adherence to the protocol was assessed by evaluating the dose of potassium administered and performance of reassessments. Effectiveness of the protocol was assessed by evaluating the time to achieve target potassium levels. Safety was assessed by evaluating the route of administration and occurrence of hyperkalemia. A total of 300 patients treated using potassium-replacement protocols required potassium replacement during the study period, with 148 patients in the NRP group requiring 491 instances of potassium replacement. In the TARP group a total of 564 instances requiring potassium replacement corresponded to 152 patients. Of the 491 instances requiring replacement in the NRP group, the correct dose was administered and reassessment performed 117 times (23.8%). Overall adherence ( p < 0.05), correct dose given ( p < 0.05), average time from blood draw to potassium replacement ( p < 0.0001), use of oral replacement ( p < 0.05), and time to achieve target potassium level within 12 hours ( p < 0.05) were significantly improved in the TARP group. The TARP improved the effectiveness and safety of potassium-replacement therapy over the traditional NRP without negatively affecting timeliness of care. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.
Bunch, Richard H.
1986-01-01
A fault finder for locating faults along a high voltage electrical transmission line. Real time monitoring of background noise and improved filtering of input signals is used to identify the occurrence of a fault. A fault is detected at both a master and remote unit spaced along the line. A master clock synchronizes operation of a similar clock at the remote unit. Both units include modulator and demodulator circuits for transmission of clock signals and data. All data is received at the master unit for processing to determine an accurate fault distance calculation.
Interface For Fault-Tolerant Control System
NASA Technical Reports Server (NTRS)
Shaver, Charles; Williamson, Michael
1989-01-01
Interface unit and controller emulator developed for research on electronic helicopter-flight-control systems equipped with artificial intelligence. Interface unit interrupt-driven system designed to link microprocessor-based, quadruply-redundant, asynchronous, ultra-reliable, fault-tolerant control system (controller) with electronic servocontrol unit that controls set of hydraulic actuators. Receives digital feedforward messages from, and transmits digital feedback messages to, controller through differential signal lines or fiber-optic cables (thus far only differential signal lines have been used). Analog signals transmitted to and from servocontrol unit via coaxial cables.
40 CFR 63.1566 - What are my requirements for organic HAP emissions from catalytic reforming units?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Catalytic Cracking Units, Catalytic Reforming Units, Sulfur Recovery Units, and Bypass Lines § 63.1566 What...
Rectifier cabinet static breaker
Costantino, Jr, Roger A.; Gliebe, Ronald J.
1992-09-01
A rectifier cabinet static breaker replaces a blocking diode pair with an SCR and the installation of a power transistor in parallel with the latch contactor to commutate the SCR to the off state. The SCR serves as a static breaker with fast turnoff capability providing an alternative way of achieving reactor scram in addition to performing the function of the replaced blocking diodes. The control circuitry for the rectifier cabinet static breaker includes on-line test capability and an LED indicator light to denote successful test completion. Current limit circuitry provides high-speed protection in the event of overload.
Measurement of Complex Sensitivity of Data Channels in Hydrophone Line Array at Very Low Frequency
2015-03-25
minimum frequency at which the acoustic projectors commonly used for acoustic calibrations can transmit a useful acoustic signal. Dkt . No. 300041...Crane Water Surface 10 inch move Dkt . No. 300041 Application No. ?? REPLACEMENT SHEET? 1st DRAFT FIG. 2 62 60 66 64 70 12 66 68 2 1 11 1 12 12 2 Dkt . No...5-5 0.6 0.8 1.0 = 51ms = 0.86 Dkt . No. 300041 Application No. ?? REPLACEMENT SHEET? 1st DRAFT FIG. 4 0 1 210 10 10 -10 -5 0 5 M ag ni tu de ( dB
Rand, D M; Kann, L M
1996-07-01
Recent studies of mitochondrial DNA (mtDNA) variation in mammals and Drosophila have shown an excess of amino acid variation within species (replacement polymorphism) relative to the number of silent and replacement differences fixed between species. To examine further this pattern of nonneutral mtDNA evolution, we present sequence data for the ND3 and ND5 genes from 59 lines of Drosophila melanogaster and 29 lines of D. simulans. Of interest are the frequency spectra of silent and replacement polymorphisms, and potential variation among genes and taxa in the departures from neutral expectations. The Drosophila ND3 and ND5 data show no significant excess of replacement polymorphism using the McDonald-Kreitman test. These data are in contrast to significant departures from neutrality for the ND3 gene in mammals and other genes in Drosophila mtDNA (cytochrome b and ATPase 6). Pooled across genes, however, both Drosophila and human mtDNA show very significant excesses of amino acid polymorphism. Silent polymorphisms at ND5 show a significantly higher variance in frequency than replacement polymorphisms, and the latter show a significant skew toward low frequencies (Tajima's D = -1.954). These patterns are interpreted in light of the nearly neutral theory where mildly deleterious amino acid haplotypes are observed as ephemeral variants within species but do not contribute to divergence. The patterns of polymorphism and divergence at charge-altering amino acid sites are presented for the Drosophila ND5 gene to examine the evolution of functionally distinct mutations. Excess charge-altering polymorphism is observed at the carboxyl terminal and excess charge-altering divergence is detected at the amino terminal. While the mildly deleterious model fits as a net effect in the evolution of nonrecombining mitochondrial genomes, these data suggest that opposing evolutionary pressures may act on different regions of mitochondrial genes and genomes.
Home Sewage Disposal. Special Circular 212.
ERIC Educational Resources Information Center
Wooding, N. Henry
This circular provides current information for homeowners who must repair or replace existing on-lot sewage disposal systems. Site requirements, characteristics and preparation are outlined for a variety of alternatives such as elevated sand mounds, sand-lined beds and trenches, and oversized absorption area. Diagrams indicating construction…
75 FR 18407 - Investing in Innovation Fund
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-12
... include computer science rather than science. To correct this error, the Department makes the following..., in footnote number eight, in line six, ``including science'' is replaced with ``including computer... obtain this document in an accessible format (e.g., Braille, large print, audiotape, or computer diskette...
77 FR 21592 - Proposal Review Panel for Materials Research; Notice of Meeting: Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-10
... 19362, column 3, line 3, please replace: ``7 p.m.-8:30p.m. Open-Poster Session'' with ``7 p.m.-10:30p.m. Open-Poster Session''. Dated: April 5, 2012. Susanne Bolton, Committee Management Officer. [FR Doc...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... subsector to replace aging vessels with newer, safer, and more efficient vessels. The Council considered... compared to the hook-and-line C/Ps active in the GOA that are not FLCC members. The Council noted that...
Renewal technologies being used for the repair, replacement and/or rehabilitation of deteriorating water distribution systems are generally effective, but there is still considerable room for improvement of these existing technologies and for the development of new technologies. ...
Active microwave negative-index metamaterial transmission line with gain.
Jiang, Tao; Chang, Kihun; Si, Li-Ming; Ran, Lixin; Xin, Hao
2011-11-11
We studied the active metamaterial transmission line at microwave frequency. The active composite right-handed or left-handed transmission line was designed to incorporate a germanium tunnel diode with a negative differential resistance property as the gain device at the unit cell level. Measurements of the fabricated planar transmission line structures with one-, two-, and three-unit cells showed that the addition of the dc pumped tunnel diodes not only provided gain but also maintained the left handedness of the transmission line metamaterial. Simulation results agree well with experimental observation. This work demonstrated that negative index material can be obtained with a net gain when an external source is incorporated.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Troffer-Charlier, Nathalie; Cura, Vincent; Hassenboehler, Pierre
2007-04-01
Isolated modules of mouse coactivator-associated arginine methyltransferase 1 encompassing the protein arginine N-methyltransferase catalytic domain have been overexpressed, purified and crystallized. X-ray diffraction data have been collected and have enabled determination of the structures by multiple isomorphous replacement using anomalous scattering. Coactivator-associated arginine methyltransferase 1 (CARM1) plays a crucial role in gene expression as a coactivator of several nuclear hormone receptors and also of non-nuclear receptor systems. Its recruitment by the transcriptional machinery induces protein methylation, leading to chromatin remodelling and gene activation. CARM1{sub 28–507} and two structural states of CARM1{sub 140–480} were expressed, purified and crystallized. Crystals of CARM1{submore » 28–507} belong to space group P6{sub 2}22, with unit-cell parameters a = b = 136.0, c = 125.3 Å; they diffract to beyond 2.5 Å resolution using synchrotron radiation and contain one monomer in the asymmetric unit. The structure of CARM1{sub 28–507} was solved by multiple isomorphous replacement and anomalous scattering methods. Crystals of apo CARM1{sub 140–480} belong to space group I222, with unit-cell parameters a = 74.6, b = 99.0, c = 207.4 Å; they diffract to beyond 2.7 Å resolution and contain two monomers in the asymmetric unit. Crystals of CARM1{sub 140–480} in complex with S-adenosyl-l-homocysteine belong to space P2{sub 1}2{sub 1}2, with unit-cell parameters a = 74.6, b = 98.65, c = 206.08 Å; they diffract to beyond 2.6 Å resolution and contain four monomers in the asymmetric unit. The structures of apo and holo CARM1{sub 140–480} were solved by molecular-replacement techniques from the structure of CARM1{sub 28–507}.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henry, H.G.; Reilly, B.P.
1995-03-01
The North Anna Power Station is located on the southern shore of Lake Anna in Louisa County, approximately forty miles northwest of Richmond, Virginia. The two 910 Mw nuclear units located on this site are owned by Virginia Electric and Power Company (Virginia Power) and Old Dominion Electric Cooperative and operated by Virginia Power. Fuel was loaded into Unit 1 in December 1977, and it began commercial operation in June 1978. Fuel was loaded into Unit 2 in April 1980 and began commercial operation in December 1980. Each nuclear unit includes a three-coolant-loop pressurized light water reactor nuclear steam supplymore » system that was furnished by Westinghouse Electric Corporation. Included within each system were three Westinghouse Model 51 steam generators with alloy 600, mill-annealed tubing material. Over the years of operation of Unit 1, various corrosion-related phenomena had occurred that affected the steam generators tubing and degraded their ability to fulfill their heat transfer function. Advanced inspection and repair techniques helped extend the useful life of the steam generators, but projections based on the results of the inspections indicated that the existing steam generators tubing and degraded their ability to fullfill their heat transfer function. Advanced inspection and repair techniques helped extend the useful life of the steam generators, but projections based on the results of the inspections indicated that the existing steam generators would not last their design life and must be repaired. To this end Virginia Power determined that a steam generator replacement (SGR) program was necessary to remove the old steam generator tube bundles and lower shell sections, including the channel heads (collectively called the lower assemblies), and replace them with new lower assemblies incorporating design features that will prevent the degradation problems that the old steam generators had experienced.« less
Historical milestones of a long pathway.
Roy, Thomas
2011-01-01
Hemodiafiltration (HDF), developed from the combination of hemodialysis and hemofiltration, is considered to be the most effective current procedure to remove uremic toxins from the blood of kidney patients. Historically, the clinical use of HDF was for many years limited due to the cost burden related to the large amount of sterile volume replacement fluid needed. The solution offered was on-line preparation of replacement fluid from standard dialysate by means of membrane filtration. Industry opened to this concept quite early and worked on various technical solutions between the early 1980s and the late 1990s before real state-of-the-art systems became commercially available on a broad basis. This article reviews in particular the activities of initially Fresenius and later Fresenius Medical Care in this field and identifies major concepts and prototypes up to today's commercially available high-end product--the 5008 therapy system--where on-line HDF finally became integrated as a standard component. Copyright © 2011 S. Karger AG, Basel.
On-line upgrade of program modules using AdaPT
NASA Technical Reports Server (NTRS)
Waldrop, Raymond S.; Volz, Richard A.; Smith, Gary W.; Goldsack, Stephen J.; Holzbach-Valero, A. A.
1993-01-01
One purpose of our research is the investigation of the effectiveness and expressiveness of AdaPT, a set of language extensions to Ada 83, for distributed systems. As a part of that effort, we are now investigating the subject of replacing, e.g. upgrading, software modules while the software system remains in operation. The AdaPT language extensions provide a good basis for this investigation for several reasons: they include the concept of specific, self-contained program modules which can be manipulated; support for program configuration is included in the language; and although the discussion will be in terms of the AdaPT language, the AdaPT to Ada 83 conversion methodology being developed as another part of this project will provide a basis for the application of our findings to Ada 83 and Ada 9X systems. The purpose of this investigation is to explore the basic mechanisms of the replacement process. With this purpose in mind, we will avoid including issues whose presence would obscure these basic mechanisms by introducing additional, unrelated concerns. Thus, while replacement in the presence of real-time deadlines, heterogeneous systems, and unreliable networks is certainly a topic of interest, we will first gain an understanding of the basic processes in the absence of such concerns. The extension of the replacement process to more complex situations can be made later. A previous report established an overview of the module replacement problem, a taxonomy of the various aspects of the replacement process, and a solution to one case in the replacement taxonomy. This report provides solutions to additional cases in the replacement process taxonomy: replacement of partitions with state and replacement of nodes. The solutions presented here establish the basic principles for module replacement. Extension of these solutions to other more complicated cases in the replacement taxonomy is direct, though requiring substantial work beyond the available funding.
Lee, Jaeyul; Kwon, Hyungwoo; Song, Jaewon; Jeon, Mansik; Kim, Jeehyun
2017-01-01
A handheld line information reader and a line information generator were developed for the efficient management of optical communication lines. The line information reader consists of a photo diode, trans-impedance amplifier, voltage amplifier, microcontroller unit, display panel, and communication modules. The line information generator consists of a laser diode, laser driving circuits, microcontroller unit, and communication modules. The line information reader can detect the optical radiation field of the test line by bending the optical fiber. To enhance the sensitivity of the line information reader, an additional lens was used with a focal length of 4.51 mm. Moreover, the simulation results obtained through BeamPROP® software from Synopsys, Inc. demonstrated a stronger optical radiation field of the fiber due to a longer transmission wavelength and larger bending angle of the fiber. Therefore, the developed devices can be considered as useful tools for the efficient management of optical communication lines. PMID:28837058
ERIC Educational Resources Information Center
Scandrett, Donald G.
1998-01-01
Examines the planning issues when replacing telescoping bleacher units and for analyzing seating options. Adresses the importance of complying with local building codes and the considerations on maintenance following installation. (GR)
Splitting Terraced Houses Into Single Units Using Oblique Aerial Imagery
NASA Astrophysics Data System (ADS)
Dahlke, D.
2017-05-01
This paper introduces a method to subdivide complex building structures like terraced houses into single house units comparable to units available in a cadastral map. 3D line segments are detected with sub-pixel accuracy in traditional vertical true orthomosaics as well as in innovative oblique true orthomosaics and their respective surface models. Hereby high gradient strengths on roofs as well as façades are taken into account. By investigating the coplanarity and frequencies within a set of 3D line segments, individual cut lines for a building complex are found. The resulting regions ideally describe single houses and thus the object complexity is reduced for subsequent topological, semantical or geometrical considerations. For the chosen study area with 70 buidling outlines a hit rate of 80% for cut lines is achieved.
Dyke, Peter C; Yates, Andrew R; Cua, Clifford L; Hoffman, Timothy M; Hayes, John; Feltes, Timothy F; Springer, Michelle A; Taeed, Roozbeh
2007-05-01
The purpose of this study was to assess the association of calcium replacement therapy with morbidity and mortality in infants after cardiac surgery involving cardiopulmonary bypass. Retrospective chart review. The cardiac intensive care unit at a tertiary care children's hospital. Infants undergoing cardiac surgery involving cardiopulmonary bypass between October 2002 and August 2004. None. Total calcium replacement (mg/kg calcium chloride given) for the first 72 postoperative hours was measured. Morbidity and mortality data were collected. The total volume of blood products given during the first 72 hrs was recorded. Infants with confirmed chromosomal deletions at the 22q11 locus were noted. Correlation and logistic regression analyses were used to generate odds ratios and 95% confidence intervals, with p < .05 being significant. One hundred seventy-one infants met inclusion criteria. Age was 4 +/- 3 months and weight was 4.9 +/- 1.7 kg at surgery. Six infants had deletions of chromosome 22q11. Infants who weighed less required more calcium replacement (r = -.28, p < .001). Greater calcium replacement correlated with a longer intensive care unit length of stay (r = .27, p < .001) and a longer total hospital length of stay (r = .23, p = .002). Greater calcium replacement was significantly associated with morbidity (liver dysfunction [odds ratio, 3.9; confidence interval, 2.1-7.3; p < .001], central nervous system complication [odds ratio, 1.8; confidence interval, 1.1-3.0; p = .02], infection [odds ratio, 1.5; confidence interval, 1.0-2.2; p < .04], extracorporeal membrane oxygenation [odds ratio, 5.0; confidence interval, 2.3-10.6; p < .001]) and mortality (odds ratio, 5.8; confidence interval, 5.8-5.9; p < .001). Greater calcium replacement was not associated with renal insufficiency (odds ratio, 1.5; confidence interval, 0.9-2.3; p = .07). Infants with >1 sd above the mean of total calcium replacement received on average fewer blood products than the total study population. Greater calcium replacement is associated with increasing morbidity and mortality. Further investigation of the etiology and therapy of hypocalcemia in this population is warranted.
NASA Technical Reports Server (NTRS)
Anderson, L. A.; Henry, R. L.; Fedor, O. H.; Owens, L. J.
1986-01-01
Rechargeable hydraulic powerpack functions as lightweight, compact source of mechanical energy. Self-contained hydraulic powerpack derives energy from solid chemical charge. Combustion of charge initiated by small hammer, and revolving feeder replaces charges expended. Combustion gases cool during expansion in turbine and not too hot for release to atmosphere. Unit has applications driving wheelchairs and operating drills, winches, and other equipment in remote areas. Also replaces electric motors and internal-combustion engines as source of power in explosive atmospheres.
2005-03-01
conversations over data networks . Many organizations are replacing portions of their traditional phone systems to gain the benefits of cost savings and...relevant to the Coast Guard. It includes the discussion of the public switched telephone network , an overview of IPT, IPT security issues, the...transmitting voice conversations over data networks . Many organizations are replacing portions of their traditional phone systems to gain the benefits of
Burbank performs Part 1 of the WRS-1 Repair
2012-03-08
ISS030-E-128752 (8 March 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, performs part one of the Water Recovery System-1 (WRS-1) repair in the Tranquility node of the International Space Station. Burbank removed and replaced the failed Catalytic Reactor (CR), and installed a temporary filter kit between the new CR and the Microbial Check Valve (MCV) to support a system flush of the new Orbital Replacement Unit (ORU).
A faster Rubisco with potential to increase photosynthesis in crops.
Lin, Myat T; Occhialini, Alessandro; Andralojc, P John; Parry, Martin A J; Hanson, Maureen R
2014-09-25
In photosynthetic organisms, D-ribulose-1,5-bisphosphate carboxylase/oxygenase (Rubisco) is the major enzyme assimilating atmospheric CO2 into the biosphere. Owing to the wasteful oxygenase activity and slow turnover of Rubisco, the enzyme is among the most important targets for improving the photosynthetic efficiency of vascular plants. It has been anticipated that introducing the CO2-concentrating mechanism (CCM) from cyanobacteria into plants could enhance crop yield. However, the complex nature of Rubisco's assembly has made manipulation of the enzyme extremely challenging, and attempts to replace it in plants with the enzymes from cyanobacteria and red algae have not been successful. Here we report two transplastomic tobacco lines with functional Rubisco from the cyanobacterium Synechococcus elongatus PCC7942 (Se7942). We knocked out the native tobacco gene encoding the large subunit of Rubisco by inserting the large and small subunit genes of the Se7942 enzyme, in combination with either the corresponding Se7942 assembly chaperone, RbcX, or an internal carboxysomal protein, CcmM35, which incorporates three small subunit-like domains. Se7942 Rubisco and CcmM35 formed macromolecular complexes within the chloroplast stroma, mirroring an early step in the biogenesis of cyanobacterial β-carboxysomes. Both transformed lines were photosynthetically competent, supporting autotrophic growth, and their respective forms of Rubisco had higher rates of CO2 fixation per unit of enzyme than the tobacco control. These transplastomic tobacco lines represent an important step towards improved photosynthesis in plants and will be valuable hosts for future addition of the remaining components of the cyanobacterial CCM, such as inorganic carbon transporters and the β-carboxysome shell proteins.
Mi, Zhibao; Novitzky, Dimitri; Collins, Joseph F; Cooper, David KC
2015-01-01
The management of brain-dead organ donors is complex. The use of inotropic agents and replacement of depleted hormones (hormonal replacement therapy) is crucial for successful multiple organ procurement, yet the optimal hormonal replacement has not been identified, and the statistical adjustment to determine the best selection is not trivial. Traditional pair-wise comparisons between every pair of treatments, and multiple comparisons to all (MCA), are statistically conservative. Hsu’s multiple comparisons with the best (MCB) – adapted from the Dunnett’s multiple comparisons with control (MCC) – has been used for selecting the best treatment based on continuous variables. We selected the best hormonal replacement modality for successful multiple organ procurement using a two-step approach. First, we estimated the predicted margins by constructing generalized linear models (GLM) or generalized linear mixed models (GLMM), and then we applied the multiple comparison methods to identify the best hormonal replacement modality given that the testing of hormonal replacement modalities is independent. Based on 10-year data from the United Network for Organ Sharing (UNOS), among 16 hormonal replacement modalities, and using the 95% simultaneous confidence intervals, we found that the combination of thyroid hormone, a corticosteroid, antidiuretic hormone, and insulin was the best modality for multiple organ procurement for transplantation. PMID:25565890
Artificial neural network application for space station power system fault diagnosis
NASA Technical Reports Server (NTRS)
Momoh, James A.; Oliver, Walter E.; Dias, Lakshman G.
1995-01-01
This study presents a methodology for fault diagnosis using a Two-Stage Artificial Neural Network Clustering Algorithm. Previously, SPICE models of a 5-bus DC power distribution system with assumed constant output power during contingencies from the DDCU were used to evaluate the ANN's fault diagnosis capabilities. This on-going study uses EMTP models of the components (distribution lines, SPDU, TPDU, loads) and power sources (DDCU) of Space Station Alpha's electrical Power Distribution System as a basis for the ANN fault diagnostic tool. The results from the two studies are contrasted. In the event of a major fault, ground controllers need the ability to identify the type of fault, isolate the fault to the orbital replaceable unit level and provide the necessary information for the power management expert system to optimally determine a degraded-mode load schedule. To accomplish these goals, the electrical power distribution system's architecture can be subdivided into three major classes: DC-DC converter to loads, DC Switching Unit (DCSU) to Main bus Switching Unit (MBSU), and Power Sources to DCSU. Each class which has its own electrical characteristics and operations, requires a unique fault analysis philosophy. This study identifies these philosophies as Riddles 1, 2 and 3 respectively. The results of the on-going study addresses Riddle-1. It is concluded in this study that the combination of the EMTP models of the DDCU, distribution cables and electrical loads yields a more accurate model of the behavior and in addition yielded more accurate fault diagnosis using ANN versus the results obtained with the SPICE models.
Andersen, Gunn Robstad; Westgaard, Rolf H
2013-11-15
Ergonomic and work stress interventions rarely show long-term positive effect. The municipality participating in this study received orders from the Norwegian Labour Inspectorate due to an identified unhealthy level of time pressure, and responded by effectuating several work environment interventions. The study aim is to identify critical factors in the interaction between work environment interventions and independent rationalization measures in order to understand a potential negative interfering effect from concurrent rationalizations on a comprehensive work environment intervention. The study, using a historic prospective mixed-method design, comprised 6 home care units in a municipality in Norway (138 respondents, response rate 76.2%; 17 informants). The study included quantitative estimations, register data of sick leave, a time line of significant events and changes, and qualitative descriptions of employee appraisals of their work situation gathered through semi-structured interviews and open survey responses. The work environment interventions were in general regarded as positive by the home care workers. However, all units were simultaneously subjected to substantial contextual instability, involving new work programs, new technology, restructurings, unit mergers, and management replacements, perceived by the home care workers to be major sources of stress. Findings suggest that concurrent changes induced through rationalization resulted in negative exposure effects that negated positive work environment intervention effects, causing an overall deteriorated work situation for the home care workers. Establishment and active utilization of communication channels from workers to managers are recommended in order to increase awareness of putative harmful and interruptive effects of rationalization measures.
2013-01-01
Background Ergonomic and work stress interventions rarely show long-term positive effect. The municipality participating in this study received orders from the Norwegian Labour Inspectorate due to an identified unhealthy level of time pressure, and responded by effectuating several work environment interventions. The study aim is to identify critical factors in the interaction between work environment interventions and independent rationalization measures in order to understand a potential negative interfering effect from concurrent rationalizations on a comprehensive work environment intervention. Methods The study, using a historic prospective mixed-method design, comprised 6 home care units in a municipality in Norway (138 respondents, response rate 76.2%; 17 informants). The study included quantitative estimations, register data of sick leave, a time line of significant events and changes, and qualitative descriptions of employee appraisals of their work situation gathered through semi-structured interviews and open survey responses. Results The work environment interventions were in general regarded as positive by the home care workers. However, all units were simultaneously subjected to substantial contextual instability, involving new work programs, new technology, restructurings, unit mergers, and management replacements, perceived by the home care workers to be major sources of stress. Findings suggest that concurrent changes induced through rationalization resulted in negative exposure effects that negated positive work environment intervention effects, causing an overall deteriorated work situation for the home care workers. Conclusions Establishment and active utilization of communication channels from workers to managers are recommended in order to increase awareness of putative harmful and interruptive effects of rationalization measures. PMID:24238560
Iveson, T J; Hickish, T; Schmitt, C; Van Cutsem, E
1999-12-01
In a recent multicentre, randomised, controlled, open-label study (Rougier and colleagues, Lancet 1998, 352, 1407-1412), irinotecan significantly increased survival without any deterioration in quality of life compared with best-estimated infusional 5-fluorouracil (5-FU) therapy in the setting of second-line treatment for metastatic colorectal cancer. The aim of the cost-effectiveness analysis reported here was to compare the economic implications, from a U.K. perspective, of replacing 5-FU therapy [either as a single agent (Lokich regimen, B2) or in combination with folinic acid (de Gramont regimen, B1, or AIO regimen, B3)] with irinotecan as second-line therapy for metastatic colorectal cancer. Resource utilisation data collected prospectively during the study, supplemented by both a questionnaire to investigators and local expert clinical opinion, were used as a basis for estimating cumulative drug dosage, chemotherapy administration and treatment of complications. Drug acquisition costs were derived from the British National Formulary (March 1998), and unit costs for clinical consultation and services were derived from relevant 1996/1997 cost databases. Although cumulative drug acquisition costs per patient were higher with irinotecan than with infusional 5-FU therapy, these were at least partially offset by lower cumulative costs per patient associated with administration of therapy and treatment of complications in the irinotecan arm than in the 5-FU arm. Based on the incremental costs per life year gained (LYG), irinotecan was considered to be cost-effective by commonly accepted criteria compared with either the B1 or B2 regimens. Irinotecan was cost-saving compared with the B3 regimen (that is significant survival gain and a reduction in costs). Thus, not only is there strong evidence for the use of irinotecan as standard second-line therapy in metastatic colorectal cancer,but the results of this prospective economic evaluation have shown that irinotecan also represents good value for money in this clinical setting.
Labeled cutaway line drawing of Shuttle Extravehicular Mobility Unit (EMU)
1991-05-21
Labeled cutaway line drawing of the Shuttle extravehicular mobility unit (EMU) identifies its various components and equipment. The portable life support system (PLSS) and protective layers of fabric (thermal micrometeoroid garment (TMG)) incorporated in this extravehicular activity (EVA) space suit are shown.
Labeled cutaway line drawing of Shuttle Extravehicular Mobility Unit (EMU)
NASA Technical Reports Server (NTRS)
1991-01-01
Labeled cutaway line drawing of the Shuttle extravehicular mobility unit (EMU) identifies its various components and equipment. The portable life support system (PLSS) and protective layers of fabric (thermal micrometeoroid garment (TMG)) incorporated in this extravehicular activity (EVA) space suit are shown.
Shopping around for hospital services: a comparison of the United States and Canada.
Bell, C M; Crystal, M; Detsky, A S; Redelmeier, D A
1998-04-01
Historical comparisons indicate that US hospitals are more expensive than Canadian hospitals, but health care system reform might have changed the relative costs and timeliness of health care in the 2 countries. To estimate the price and convenience of selected hospital services in the United States and Canada for patients in 1997 had they paid out-of-pocket. Cross-sectional telephone survey conducted May 1996 to April 1997. The 2 largest acute care general hospitals from every city in the United States and Canada with a population greater than 500000. Each hospital was telephoned and asked their price and waiting time for 7 services: magnetic resonance imaging of the head without gadolinium; a screening mammogram; a 12-lead electrocardiogram; a prothrombin time measurement; a session of hemodialysis; a screening colonoscopy; and a total knee replacement. Waiting times were measured in days until earliest appointment and charges were converted to American currency. Overall, 48 US and 18 Canadian hospitals were surveyed. Median waiting times were significantly shorter in American hospitals for 4 services, particularly a magnetic resonance imaging of the head (3 days vs 150 days; P<.001). Median charges were significantly higher in American hospitals for 6 services, particularly for a total knee replacement ($26805 vs $10651; P<.001). Individual services showed no association between shorter waiting times and higher prices within each country, with the exception of a total knee replacement in the United States. US hospitals still provide higher prices and faster care than Canadian hospitals for patients who pay out-of-pocket.
See, Kay Choong; Lee, Margaret; Mukhopadhyay, Amartya
2009-01-01
Regional citrate anti-coagulation for continuous renal replacement therapy chelates calcium to produce the anti- coagulation effect. We hypothesise that a calcium-free replacement solution will require less citrate and produce fewer metabolic side effects. Fifty patients, in a Medical Intensive Care Unit of a tertiary teaching hospital (25 in each group), received continuous venovenous hemofiltration using either calcium-containing or calcium-free replacement solutions. Both groups had no significant differences in filter life, metabolic alkalosis, hypernatremia, hypocalcemia, and hypercalcemia. However, patients using calcium-containing solution developed metabolic alkalosis earlier, compared to patients using calcium-free solution (mean 24.6 hours,CI 0.8-48.4 vs. 37.2 hours, CI 9.4-65, P = 0.020). When calcium-containing replacement solution was used, more citrate was required (mean 280 ml/h, CI 227.2-332.8 vs. 265 ml/h, CI 203.4-326.6, P = 0.069), but less calcium was infused (mean 21.2 ml/h, CI 1.2-21.2 vs 51.6 ml/h, CI 26.8-76.4, P < or = 0.0001).
Raigrodski, Ariel J; Yu, Alika; Chiche, Gerard J; Hochstedler, J L; Mancl, Lloyd A; Mohamed, Shawky E
2012-10-01
In recent years, zirconium dioxide-based partial fixed dental prostheses (FDP) have been suggested as an alternative treatment to traditional metal ceramic FDPs. However, clinical studies evaluating their longevity and related complications are limited. The purpose of this cohort clinical study was to assess the efficacy of zirconium dioxide-based posterior 3-unit FDPs. Twenty 3-unit posterior FDPs (Lava) were placed in 16 participants missing a second premolar or a first molar. All participants met specific inclusion and exclusion criteria and provided informed consent. All teeth were prepared in a standardized manner: occlusal reduction of 1.5 to 2 mm; axial reduction of 1 to 1.5 mm; a 1.0 mm 360-degree rounded shoulder placed 0.5 mm subgingivally on the facial aspect and supragingivally on the lingual aspect on sound tooth structure; and rounded internal line angles. Definitive impressions were made with vinyl polysiloxane impression material. Frameworks were fabricated by using computer-aided design and computer-aided manufacturing (CAD/CAM) technology with a uniform retainer thickness of 0.6 mm and a minimal connector surface area of 9 mm(2). Restorations were luted with resin-modified glass ionomer cement (Rely-X Luting). Participants were recalled at 2 weeks, 6 months, and 12 months, and thereafter, annually for up to 60 months. Clinical fracture measurements, marginal discoloration, marginal adaptation, radiographic proximal recurrent caries, and periapical pathoses were assessed over time by using modified Ryge criteria. The probability distributions of these variables were calculated for the baseline data and for the recall data. An analysis of survival was made by using the Kaplan-Meier method. Eighteen FDPs were clinically evaluated at 5 years and 1 at 48 months. Fifteen were rated Alpha for fracture measurements, and 2 were rated Bravo (minor chipping of veneering porcelain and not requiring restoration replacement). Two were rated Charlie (major chipping of veneering porcelain and requiring restoration replacement). Eighteen FDPs were rated Alpha for marginal integrity, and 1 rated Bravo. All restorations were rated Alpha for marginal discoloration. One participant experienced root fracture after 60 months, while another was treated surgically for a periapical pathosis on an endodontically treated abutment. Zirconium dioxide-based posterior 3-unit FDPs performed well after 5 years of service. Copyright © 2012 The Editorial Council of the Journal of Prosthetic Dentistry. Published by Mosby, Inc. All rights reserved.
Hatcher, P.G.
1988-01-01
A series of decomposed and coalified gymnosperm woods was examined by conventional solid-state 13C nuclear magnetic resonance (NMR) and by dipolar-dephasing NMR techniques. The results of these NMR studies for a histologically related series of samples provide clues as to the nature of codification reactions that lead to the defunctionalization of lignin-derived aromatic structures. These reactions sequentially involve the following: (1) loss of methoxyl carbons from guaiacyl structural units with replacement by hydroxyls and increased condensation; (2) loss of hydroxyls or aryl ethers with replacement by hydrogen as rank increases from lignin to high-volatile bituminous coal; (3) loss of alkyl groups with continued replacement by hydrogen. The dipolar-dephasing data show that the early stages of coalification in samples examined (lignin to lignite) involve a decreasing degree of protonation on aromatic rings and suggest that condensation is significant during coalification at this early stage. An increasing degree of protonation on aromatic rings is observed as the rank of the sample increases from lignite to anthracite.
Pento, Robert; Marks, James E.; Staffanson, Clifford D.
2000-01-01
A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions may be perpendicular to the direction of current flow through the module.
Soldering in a Reduced Gravity Environment (SoRGE)
NASA Technical Reports Server (NTRS)
Easton, John W.; Struk, Peter M.
2012-01-01
Future long-duration human exploration missions will be challenged by constraints on mass and volume allocations available for spare parts. Addressing this challenge will be critical to the success of these missions. As a result, it is necessary to consider new approaches to spacecraft maintenance and repair that reduce the need for large replacement components. Currently, crew members on the International Space Station (ISS) recover from faults by removing and replacing, using backup systems, or living without the function of Orbital Replacement Units (ORUs). These ORUs are returned to a depot where the root cause of the failure is determined and the ORU is repaired. The crew has some limited repair capability with the Modulation/DeModulation (MDM) ORU, where circuit cards are removed and replace in faulty units. The next step to reducing the size of the items being replaced would be to implement component-level repair. This mode of repair has been implemented by the U.S. Navy in an operational environment and is now part of their standard approach for maintenance. It is appropriate to consider whether this approach can be adapted for future spaceflight operations. To this end, the Soldering in a Reduced Gravity Environment (SoRGE) experiment studied the effect of gravity on the formation of solder joints on electronic circuit boards. This document describes the SoRGE experiment, the analysis methods, and results to date. This document will also contain comments from the crew regarding their experience conducting the SoRGE experiment as well as recommendations for future improvements. Finally, this document will discuss the plans for the SoRGE samples which remain on ISS.
Tracheal replacement in rabbits with a new composite silicone-metallic prosthesis.
Dodge-Khatami, Ali; Niessen, Hans W M; Koole, Leo H; Klein, Marloes G; van Gulik, Thomas M; de Mol, Bas A J M
2003-09-01
A new composite silicone-metallic prosthesis was tested, studying the potential for respiratory epithelial covering over the biocompatible inner lining, in a rabbit survival model. Seven New Zealand White rabbits underwent near-total excision of their trachea and implantation of a sterile prosthesis. After 2 months, they were sacrificed and the prostheses were retrieved. Specimens were fixed and histologically examined for tissue reaction around the prosthesis, at the anastomotic lines, and particularly for the presence or absence of epithelialization of the inner lumen over the biocompatible surface. All rabbits survived the operation. At 2 months, the outer layer of the prosthesis was consistently covered with fibrosis and neutrophils. The inner layer showed necrotic cells and scant re-epithelialization over the biocompatible lining, up to 5 mm beyond the anastomosis, with no evidence of organized respiratory epithelium in the middle sections. The new prosthesis is a viable temporary solution for airway replacement in rabbits. Granulation tissue was not observed at the anastomosis, and re-epithelialization did occur, but failed to achieve full-length luminal covering. The potential for granulation tissue does not yet make this an ideal long-term solution. Improvements in prosthesis design or biocompatibility are required, and need to be re-evaluated before applicability for chronic use.
Effect of flow rate and lead/copper pipe sequence on lead release from service lines.
Cartier, Clément; Arnold, Roger B; Triantafyllidou, Simoni; Prévost, Michèle; Edwards, Marc
2012-09-01
A pilot experiment examined lead leaching from four representative configurations of service lines including: (1) 100% lead (Pb), (2) 100% copper (Cu), (3) 50% Pb upstream of 50% Cu, and (4) 50% Pb-downstream of 50% Cu using a range of flow rates. The cumulative mass of lead release indicated that a typical partial replacement configuration (50% lead downstream of copper) did not provide a net reduction in lead when compared to 100% lead pipe (85 mg for 50% Pb-downstream versus 83 mg for 100%-Pb) due to galvanic and deposition corrosion. The partially replaced service line configuration also had a much greater likelihood of producing water with "spikes" of lead particulates at higher flow rates, while tending to produce lower levels of lead at very low flow rates. After the first 214 days the galvanic current between copper and lead was only reduced by 34%, proving that galvanic impacts can be highly persistent even in water with optimized corrosion control by dosing of zinc orthophosphate. Finally, this experiment raises concern about the low flow rates used during some prior home sampling events, which may underestimate exposure to lead during normal water use, especially when galvanic Pb:Cu connections are present. Copyright © 2012 Elsevier Ltd. All rights reserved.
The HITRAN2016 molecular spectroscopic database
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gordon, I. E.; Rothman, L. S.; Hill, C.
This paper describes the contents of the 2016 edition of the HITRAN molecular spectroscopic compilation. The new edition replaces the previous HITRAN edition of 2012 and its updates during the intervening years. The HITRAN molecular absorption compilation is comprised of five major components: the traditional line-by-line spectroscopic parameters required for high-resolution radiative-transfer codes, infrared absorption cross-sections for molecules not yet amenable to representation in a line-by-line form, collision-induced absorption data, aerosol indices of refraction, and general tables such as partition sums that apply globally to the data. The new HITRAN is greatly extended in terms of accuracy, spectral coverage, additionalmore » absorption phenomena, added line-shape formalisms, and validity. Moreover, molecules, isotopologues, and perturbing gases have been added that address the issues of atmospheres beyond the Earth. Of considerable note, experimental IR cross-sections for almost 200 additional significant molecules have been added to the database.« less
ERIC Educational Resources Information Center
Hoyt, Michael F.; Gurman, Alan S.
2012-01-01
Attention is called to disturbing developments in insurance reimbursement that threaten the practice of therapy involving more than one person. This can be seen as part of the movement to marginalize psychotherapy as first-line treatment and replace it with the inappropriate and excessive (and often exclusive) use of medication.
Libraries: Leviathanic Vagrants on a "Titanic" Trip
ERIC Educational Resources Information Center
Vagianos, Louis
1973-01-01
Libraries today operate on the assumption that they are a necessary and viable social institution with a long life expectancy. However, labor productivity, automation levels, and costs are not in line with todays economic requirements. Competing information services may replace libraries by the turn of the century. (DH)
77 FR 34392 - Government-Owned Inventions; Availability for Licensing
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
... and efficacy against renal and prostate cancer cell lines in vivo. The compound can be efficiently... sperm binding persist after replacement of mouse sperm receptors with human homologs. Dev Cell. 2003 Jul....; 301-435- 4074; [email protected] . Englerin A: A Novel Renal Cancer Therapeutic Isolated...
Accounting for Teamwork: A Critical Study of Group-Based Systems of Organizational Control.
ERIC Educational Resources Information Center
Ezzamel, Mahmoud; Willmott, Hugh
1998-01-01
Examines the role of accounting calculations in reorganizing manufacturing capabilities of a vertically integrated global retailing company. Introducing teamwork to replace line work extended traditional, hierarchical management control systems. Teamwork's self-managing demands contravened workers' established sense of self-identity as…
Human hematopoietic progenitors express erythropoietin.
Stopka, T; Zivny, J H; Stopkova, P; Prchal, J F; Prchal, J T
1998-05-15
Erythropoietin (EPO) is a factor essential for erythroid cell proliferation, differentiation, and survival. The production of EPO by the kidneys in response to hypoxia and anemia is well documented. To determine whether EPO is also produced by hematopoietic cells, we analyzed the expression of EPO in normal human hematopoietic progenitors and in their progeny. Undifferentiated CD34(+)lin- hematopoietic progenitors do not have detectable EPO mRNA. Differentiating CD34(+) cells that are stimulated with recombinant human EPO in serum-free liquid cultures express both EPO and EPO receptor (EPOR). Because CD34(+) cells represent a heterogeneous cell population, we analyzed individual burst-forming units-erythroid (BFU-E) and nonerythroid colony-forming unit-granulocyte-macrophage colonies for EPO mRNA. Only BFU-E colonies were positive for EPO mRNA. Lysates from pooled BFU-E colonies stained positively for EPO by immunoblotting. To further confirm the intrinsic nature of erythroid EPO, we replaced extrinsic EPO in erythroid colony cultures with EPO-mimicking peptide (EMP). We show EPO expression in the EMP-stimulated BFU-Es at both mRNA and protein levels. Stimulation of bone marrow mononuclear cells (BMMCs) with EMP upregulated EPO expression. Furthermore, we found EPO and EPOR mRNAs as well as EPO protein in K562 cells, a human erythroleukemia cell line. Stimulation of K562 cells with EMP upregulated EPO expression. We suggest that EPO of erythroid origin may have a role in the regulation of erythropoiesis.
Maternal cfDNA screening for Down syndrome--a cost sensitivity analysis.
Cuckle, Howard; Benn, Peter; Pergament, Eugene
2013-07-01
This study aimed to determine the principal factors contributing to the cost of avoiding a birth with Down syndrome by using cell-free DNA (cfDNA) to replace conventional screening. A range of unit costs were assigned to each item in the screening process. Detection rates were estimated by meta-analysis and modeling. The marginal cost associated with the detection of additional cases using cfDNA was estimated from the difference in average costs divided by the difference in detection. The main factor was the unit cost of cfDNA testing. For example, replacing a combined test costing $150 with 3% false-positive rate and invasive testing at $1000, by cfDNA tests at $2000, $1500, $1000, and $500, the marginal cost is $8.0, $5.8, $3.6, and $1.4m, respectively. Costs were lower when replacing a quadruple test and higher for a 5% false-positive rate, but the relative importance of cfDNA unit cost was unchanged. A contingent policy whereby 10% to 20% women were selected for cfDNA testing by conventional screening was considerably more cost-efficient. Costs were sensitive to cfDNA uptake. Universal cfDNA screening for Down syndrome will only become affordable by public health purchasers if costs fall substantially. Until this happens, the contingent use of cfDNA is recommended. © 2013 John Wiley & Sons, Ltd.
ERIC Educational Resources Information Center
Chase, Anthony M.
2016-01-01
This dissertation consists of two studies at the United States Military Academy. Both studies involve the use of Course-based Undergraduate Research Experiences (CUREs). These experiences give students the ability to engage in undergraduate research at an early point in their academic career by replacing traditional laboratory activities with…
Comparison of cropland and forest surface temperatures across the conterminous United States
James D. Wickham; Timothy G. Wade; Kurt H. Riitters
2012-01-01
Global climate models (GCM) investigating the effects of land cover on climate have found that replacing extra-tropical forest with cropland promotes cooling. We compared cropland and forest surface temperatures across the continental United States in 16 cells that were approximately 1◦ Ã 2◦ using 1 km2 MODIS land surface...
The Joint Operating Agreement: A Marvelous Machine with Damned Tight Steering.
ERIC Educational Resources Information Center
Pilgrim, Tim A.; Simpson, Roger
The Newspaper Preservation Act of 1970 is frequently viewed as a legislative device for averting the failure of a competing metropolitan daily newspaper and is said to create, for the formerly competing newspapers, a monolithic management unit which enjoys advantages over the two publishing units it replaces. A study examined one of those…
75 FR 2055 - Airworthiness Directives; Fokker Services B.V. Model F.28 Mark 0070 and 0100 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
... include inspecting the backlash remover of the elevator booster control unit to determine the displacement... measurement of the displacement, the compliance time for replacement ranges from before further flight to 3... of the elevator booster control unit to determine the displacement of the pivot bolt; and if...
ERIC Educational Resources Information Center
Mansell, Jim; Ritchie, Fiona; Dyer, Ricinda
2010-01-01
Background: As institutions for people with intellectual disabilities have been replaced with community services, health care provision has developed to provide assessment and treatment, low and medium secure units for people with challenging behaviour or mental health problems. These include both public and private sector provision. Little is…
40 CFR 96.71 - Initial certification and recertification procedures
Code of Federal Regulations, 2010 CFR
2010-07-01
...: replacement of the analyzer, change in location or orientation of the sampling probe or site, or changing of... basis under § 96.74(d); (i) For a unit that has commences operation before its compliance deadline under... control period basis under § 96.74(b)(3)(ii) of this part: (i) For a unit that commenced operation before...