Sample records for maintenance pm program

  1. PM Program Prevents Early AM Repairs

    ERIC Educational Resources Information Center

    McRae, David

    1974-01-01

    Discusses how to initiate a preventive maintenance (PM) program: (1) make inventory of equipment that needs a PM program; (2) gather data about each piece of equipment; and (3) set maintenance goals. (Author/PG)

  2. Application of reliability-centered maintenance to boiling water reactor emergency core cooling systems fault-tree analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Choi, Y.A.; Feltus, M.A.

    1995-07-01

    Reliability-centered maintenance (RCM) methods are applied to boiling water reactor plant-specific emergency core cooling system probabilistic risk assessment (PRA) fault trees. The RCM is a technique that is system function-based, for improving a preventive maintenance (PM) program, which is applied on a component basis. Many PM programs are based on time-directed maintenance tasks, while RCM methods focus on component condition-directed maintenance tasks. Stroke time test data for motor-operated valves (MOVs) are used to address three aspects concerning RCM: (a) to determine if MOV stroke time testing was useful as a condition-directed PM task; (b) to determine and compare the plant-specificmore » MOV failure data from a broad RCM philosophy time period compared with a PM period and, also, compared with generic industry MOV failure data; and (c) to determine the effects and impact of the plant-specific MOV failure data on core damage frequency (CDF) and system unavailabilities for these emergency systems. The MOV stroke time test data from four emergency core cooling systems [i.e., high-pressure coolant injection (HPCI), reactor core isolation cooling (RCIC), low-pressure core spray (LPCS), and residual heat removal/low-pressure coolant injection (RHR/LPCI)] were gathered from Philadelphia Electric Company`s Peach Bottom Atomic Power Station Units 2 and 3 between 1980 and 1992. The analyses showed that MOV stroke time testing was not a predictor for eminent failure and should be considered as a go/no-go test. The failure data from the broad RCM philosophy showed an improvement compared with the PM-period failure rates in the emergency core cooling system MOVs. Also, the plant-specific MOV failure rates for both maintenance philosophies were shown to be lower than the generic industry estimates.« less

  3. Preventive Maintenance Process

    NASA Technical Reports Server (NTRS)

    Ciaruffoli, Veronica; Bramley, Craig; Matteson, Mike

    2001-01-01

    The Preventive Maintenance (PM) program at Stennis Space Center (SSC) evolved from an ineffective and poorly organized state to a highly organized state in which it became capable of tracking equipment, planning jobs with man hour estimates, and supporting outsourcing. This viewgraph presentation traces the steps the program took to improve itself.

  4. A programmatic approach to long-term bridge preventive maintenance.

    DOT National Transportation Integrated Search

    2016-04-15

    State transportation agencies use cost-effective preventive maintenance (PM) programs to preserve existing roadway systems, slow down their deterioration, and improve their functional condition. Currently, KYTCs bridge inventory includes approxima...

  5. Preventative maintenance program for bridges.

    DOT National Transportation Integrated Search

    2015-07-01

    The Kentucky Transportation Cabinets (KYTC) bridge inventory is rapidly aging. As such, the Cabinet : needs to identify and implement relevant preventative maintenance (PM) actions to extend the useful : service lives of those structures. Maintena...

  6. Determining optimal preventive maintenance interval for component of Well Barrier Element in an Oil & Gas Company

    NASA Astrophysics Data System (ADS)

    Siswanto, A.; Kurniati, N.

    2018-04-01

    An oil and gas company has 2,268 oil and gas wells. Well Barrier Element (WBE) is installed in a well to protect human, prevent asset damage and minimize harm to the environment. The primary WBE component is Surface Controlled Subsurface Safety Valve (SCSSV). The secondary WBE component is Christmas Tree Valves that consist of four valves i.e. Lower Master Valve (LMV), Upper Master Valve (UMV), Swab Valve (SV) and Wing Valve (WV). Current practice on WBE Preventive Maintenance (PM) program is conducted by considering the suggested schedule as stated on manual. Corrective Maintenance (CM) program is conducted when the component fails unexpectedly. Both PM and CM need cost and may cause production loss. This paper attempts to analyze the failure data and reliability based on historical data. Optimal PM interval is determined in order to minimize the total cost of maintenance per unit time. The optimal PM interval for SCSSV is 730 days, LMV is 985 days, UMV is 910 days, SV is 900 days and WV is 780 days. In average of all components, the cost reduction by implementing the suggested interval is 52%, while the reliability is improved by 4% and the availability is increased by 5%.

  7. 48 CFR 301.607-75 - Maintenance of FAC-P/PM certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintain FAC-P/PM certification, HHS Program and Project Managers are required to earn 80 CLPs of skills...) Training activities, such as teaching, self-directed study, and mentoring; (2) Courses completed to achieve...

  8. A programmatic approach to long-term bridge preventive maintenance : final report.

    DOT National Transportation Integrated Search

    2016-04-01

    State transportation agencies use cost-effective preventive maintenance (PM) programs to preserve existing roadway systems, slow down their deterioration, and improve their functional condition. Currently, KYTCs bridge inventory includes approxima...

  9. Prototype road weather performance management (RW-PM) tool and Minnesota Department of Transportation (MnDOT) field evaluation.

    DOT National Transportation Integrated Search

    2017-01-01

    FHWAs Road Weather Management Program developed a Prototype Road Weather Management (RW-PM) Tool to help DOTs maximize the effectiveness of their maintenance resources and efficiently adjust deployments dynamically, as road conditions and traffic ...

  10. On the preventive management of sediment-related sewer blockages: a combined maintenance and routing optimization approach.

    PubMed

    Fontecha, John E; Akhavan-Tabatabaei, Raha; Duque, Daniel; Medaglia, Andrés L; Torres, María N; Rodríguez, Juan Pablo

    In this work we tackle the problem of planning and scheduling preventive maintenance (PM) of sediment-related sewer blockages in a set of geographically distributed sites that are subject to non-deterministic failures. To solve the problem, we extend a combined maintenance and routing (CMR) optimization approach which is a procedure based on two components: (a) first a maintenance model is used to determine the optimal time to perform PM operations for each site and second (b) a mixed integer program-based split procedure is proposed to route a set of crews (e.g., sewer cleaners, vehicles equipped with winches or rods and dump trucks) in order to perform PM operations at a near-optimal minimum expected cost. We applied the proposed CMR optimization approach to two (out of five) operative zones in the city of Bogotá (Colombia), where more than 100 maintenance operations per zone must be scheduled on a weekly basis. Comparing the CMR against the current maintenance plan, we obtained more than 50% of cost savings in 90% of the sites.

  11. Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Lock Accident Study

    DTIC Science & Technology

    1990-09-01

    ZIP Code) 10 . SOURCE OF FUNDIN6 NUMBERS -- . ;_ PROGRAM PROJECT TASK WORK UNIT Washington, DC 20314-1000 ELEMENT NO. NO. NO. . NO. 11. TITLE (1 eNy...miwcrwA; I ’+an na SECURITY CLASSIFICATION OF THIS PAGE 10 . WORK UNIT ACCESSION NO. (Continued). Funding provided by Repair, Evaluation, Maintenance, and... 10 PM S ............................................................... 10 District Records

  12. 40 CFR 52.1620 - Identification of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... prohibit interference with maintenance and PSD measures in any other state. Interstate transport for the... interference with maintenance and PSD measures in any other state. Sunland Park 1997 8-Hour Ozone Maintenance... other states' programs for PSD for the 1997 and 2008 Ozone and the 1997 and 2006 PM2.5 NAAQS Bernalillo...

  13. 76 FR 23911 - Fisheries of the Caribbean, Gulf of Mexico, and South Atlantic; Reef Fish Fishery of the Gulf of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... maintenance window for the Gulf individual fishing quota (IFQ) programs, and removing obsolete codified text..., etc.), extends the IFQ maintenance window an additional 8 hours to allow for more time to conduct end... maintenance window. All electronic IFQ transactions must be completed by December 31 at 6 p.m. eastern time...

  14. Periodontal and periimplant maintenance: a critical factor in long-term treatment success.

    PubMed

    Shumaker, Nicholas D; Metcalf, Brett T; Toscano, Nicholas T; Holtzclaw, Dan J

    2009-09-01

    Periodontal maintenance (PM) is a critical factor in the long-term success of both periodontal and dental implant therapy. Studies have shown both modern periodontal and dental implant therapies are effective in maintaining natural teeth and replacing lost teeth, respectively. However, without a regular program of clinical reevaluation, plaque control, oral hygiene instruction, and reassessment of biomechanical factors, the benefits of treatment often are lost and inflammatory disease in the form of recurrent periodontitis or periimplantitis may result. This article reviews the goals, types, and appropriate frequency of PM in periodontal and dental implant therapy, as well as the incidence and etiology of periimplant disease and strategies for management when recurrent disease develops during the maintenance phase of treatment.

  15. Developmental state program for institutional conservation: Volume 7: Final technical report, 1 October 1986--30 September 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-01

    The state of New Mexico has contracted with Frank Bolek and Associates to perform an Energy Audit (EA) for San Jon Elementary and San Jon high School, and to organize data at the schools to assist the School District in developing a Heating, Ventilating and Air Conditioning (HVAC) Preventive Maintenance (PM) program. The goal of both the EA and PM is to reduce energy consumption and operating costs of the schools.

  16. DATMAN: A reliability data analysis program using Bayesian updating

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Becker, M.; Feltus, M.A.

    1996-12-31

    Preventive maintenance (PM) techniques focus on the prevention of failures, in particular, system components that are important to plant functions. Reliability-centered maintenance (RCM) improves on the PM techniques by introducing a set of guidelines by which to evaluate the system functions. It also minimizes intrusive maintenance, labor, and equipment downtime without sacrificing system performance when its function is essential for plant safety. Both the PM and RCM approaches require that system reliability data be updated as more component failures and operation time are acquired. Systems reliability and the likelihood of component failures can be calculated by Bayesian statistical methods, whichmore » can update these data. The DATMAN computer code has been developed at Penn State to simplify the Bayesian analysis by performing tedious calculations needed for RCM reliability analysis. DATMAN reads data for updating, fits a distribution that best fits the data, and calculates component reliability. DATMAN provides a user-friendly interface menu that allows the user to choose from several common prior and posterior distributions, insert new failure data, and visually select the distribution that matches the data most accurately.« less

  17. March 10, 2006, Transportation Conformity Rule That Addresses Requirements for Project-level Conformity Determinations in PM2.5 and PM10 Nonattainment and Maintenance Areas

    EPA Pesticide Factsheets

    This final rule, published March 10, 2006, establishes requirements for project-level conformity determinations in particulate matter (PM) 2.5 nonattainment and maintenance areas, and revises existing requirements for projects in PM10 areas.

  18. Creation of an instrument maintenance program at W. M. Keck Observatory

    NASA Astrophysics Data System (ADS)

    Hill, G. M.; Kwok, S. H.; Mader, J. A.; Wirth, G. D.; Dahm, S. E.; Goodrich, R. W.

    2014-08-01

    Until a few years ago, the W. M. Keck Observatory (WMKO) did not have a systematic program of instrument maintenance at a level appropriate for a world-leading observatory. We describe the creation of such a program within the context of WMKO's lean operations model which posed challenges but also guided the design of the system and resulted in some unique and notable capabilities. These capabilities and the flexibility of the system have led to its adoption across the Observatory for virtually all PM's. The success of the Observatory in implementing the program and its impact on instrument reliability are presented. Lessons learned are reviewed and strategic implications discussed.

  19. Maintenance Downtime

    Atmospheric Science Data Center

    2013-07-10

    ... will be unavailable March 5, 2013 8:00 am to 5:00 pm due to database maintenance. Date(s):  Tuesday, March 5, 2013 ... will be unavailable March 5, 2013 8:00 am to 5:00 pm due to database maintenance. ...

  20. Peritubular Myoid Cells Participate in Male Mouse Spermatogonial Stem Cell Maintenance

    PubMed Central

    Chen, Liang-Yu; Brown, Paula R.; Willis, William B.

    2014-01-01

    Peritubular myoid (PM) cells surround the seminiferous tubule and together with Sertoli cells form the cellular boundary of the spermatogonial stem cell (SSC) niche. However, it remains unclear what role PM cells have in determining the microenvironment in the niche required for maintenance of the ability of SSCs to undergo self-renewal and differentiation into spermatogonia. Mice with a targeted disruption of the androgen receptor gene (Ar) in PM cells experienced a progressive loss of spermatogonia, suggesting that PM cells require testosterone (T) action to produce factors influencing SSC maintenance in the niche. Other studies showed that glial cell line-derived neurotrophic factor (GDNF) is required for SSC self-renewal and differentiation of SSCs in vitro and in vivo. This led us to hypothesize that T-regulated GDNF expression by PM cells contributes to the maintenance of SSCs. This hypothesis was tested using an adult mouse PM cell primary culture system and germ cell transplantation. We found that T induced GDNF expression at the mRNA and protein levels in PM cells. Furthermore, when thymus cell antigen 1-positive spermatogonia isolated from neonatal mice were cocultured with PM cells with or without T and transplanted to the testes of germ cell-depleted mice, the number and length of transplant-derived colonies was increased considerably by in vitro T treatment. These results support the novel hypothesis that T-dependent regulation of GDNF expression in PM cells has a significant influence on the microenvironment of the niche and SSC maintenance. PMID:25181385

  1. 78 FR 34095 - Adequacy Status of the Idaho, Northern Ada County PM10

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... 10 State Implementation Plan, Maintenance Plan: Ten-Year Update (Maintenance Plan Update) are..., Northern Ada County PM 10 State Implementation Plan for Transportation Conformity Purposes AGENCY... particulate matter with an aerodynamic diameter of a nominal 10 microns or less (PM 10 ), nitrogen oxides (NOx...

  2. 40 CFR 93.102 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PM2.5 nonattainment and maintenance areas with respect to PM2.5 from re-entrained road dust if the EPA... further progress, attainment or maintenance strategy. Re-entrained road dust emissions are produced by... applicability. The provisions of this subpart shall apply in all nonattainment and maintenance areas for...

  3. The impact of preventive maintenance practices on manufacturing performance: A proposed model for SMEs in Malaysia

    NASA Astrophysics Data System (ADS)

    Lazim, Halim Mad; Taib, Che Azlan; Lamsali, Hendrik; Saleh, Mohamed Najib; Subramaniam, Chandrakantan

    2016-08-01

    Preventive maintenance (PM) plays important role to avoid or mitigate potential stoppages and disruptions of equipment or machinery from occurring in daily operations. PM emphasized total employee involvement and it is important for companies as well as Small and Medium Sized Enterprises (SMEs). SME sectors contribution to the Malaysian economy makes up 95% of the total manufacturers, however PM remain relatively lacking. The ability, reliability and effective maintenance management is highly important in order to achieve desired manufacturing performance. Therefore, organizational capability in planning, controlling, implementing and monitoring PM activities is important. Furthermore, empirical evidence on the potential impact of PM practices towards manufacturing performance with organizational capability as a moderating effect is still limited and indecisive. Henceforth, this paper aims to explore and investigate potential relationships between PM practices and manufacturing performance moderated by organizational capability in the contact of Malaysian SMEs in the manufacturing sector. Correspondently, the study intends to propose a new research framework and hypotheses to examine the abovementioned relationships. The proposed framework includes PM team, PM strategy and planned maintenance as the determinants, while organizational capability serves as the moderating variable. Manufacturing performance will be viewed in terms of innovation and financial factors. Proposed research direction and conclusion are discussed at the end of the study.

  4. 77 FR 34149 - Heavy-Duty Highway Program: Revisions for Emergency Vehicles and SCR Maintenance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... soot. Since this burning can involve extra heat and/or oxygen or oxygen- containing compounds, this... fuel consumption. This loss in performance may be noticed by the vehicle operator in terms of poor... excessive amounts of trapped PM begin to oxidize at high temperatures (i.e., DPF regeneration temperatures...

  5. 77 FR 75865 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... 1997 Annual PM 2.5 NAAQS maintenance plan, including the on-road motor vehicle insignificance finding... Implementation Plan (SIP) to include the 1997 Annual PM 2.5 maintenance plan for the Kentucky portion of the Huntington-Ashland Area. EPA is also approving the on-road motor vehicle insignificance finding for direct PM...

  6. 78 FR 59261 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... continue to attain the 24-hour PM 10 NAAQS for at least 10 years beyond redesignation (i.e., through 2023... maintenance demonstration showing how the area will continue to attain the 24-hour PM 10 NAAQS for 10 years... serves as the Sacramento PM 10 Maintenance Plan's attainment year emissions inventory, as satisfying the...

  7. Dynamic decision-making for reliability and maintenance analysis of manufacturing systems based on failure effects

    NASA Astrophysics Data System (ADS)

    Zhang, Ding; Zhang, Yingjie

    2017-09-01

    A framework for reliability and maintenance analysis of job shop manufacturing systems is proposed in this paper. An efficient preventive maintenance (PM) policy in terms of failure effects analysis (FEA) is proposed. Subsequently, reliability evaluation and component importance measure based on FEA are performed under the PM policy. A job shop manufacturing system is applied to validate the reliability evaluation and dynamic maintenance policy. Obtained results are compared with existed methods and the effectiveness is validated. Some vague understandings for issues such as network modelling, vulnerabilities identification, the evaluation criteria of repairable systems, as well as PM policy during manufacturing system reliability analysis are elaborated. This framework can help for reliability optimisation and rational maintenance resources allocation of job shop manufacturing systems.

  8. Maintenance Downtime October 17 - 23, 2014

    Atmospheric Science Data Center

    2014-10-23

    ... Impact:  The ASDC will be conducting extended system maintenance Fri 10/17@4pm - Thu 10/23@4pm  EDT Please expect: ... and Customization Tool -  AMAPS, CALIPSO, CERES, MOPITT, TES and TAD Search and Subset Tools   All systems will be ...

  9. Solving complex maintenance planning optimization problems using stochastic simulation and multi-criteria fuzzy decision making

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tahvili, Sahar; Österberg, Jonas; Silvestrov, Sergei

    One of the most important factors in the operations of many cooperations today is to maximize profit and one important tool to that effect is the optimization of maintenance activities. Maintenance activities is at the largest level divided into two major areas, corrective maintenance (CM) and preventive maintenance (PM). When optimizing maintenance activities, by a maintenance plan or policy, we seek to find the best activities to perform at each point in time, be it PM or CM. We explore the use of stochastic simulation, genetic algorithms and other tools for solving complex maintenance planning optimization problems in terms ofmore » a suggested framework model based on discrete event simulation.« less

  10. Probing Emissions of Military Cargo Aircraft: Description of a Joint Field Measurement Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cheng, Mengdawn; Corporan, E.; DeWitt, M.

    2008-01-01

    Direct emissions of NOx, volatile organic compounds, and particulate matter (PM) by aircraft contribute to the pollutant levels found in the atmosphere. Aircraft emissions can be injected at the ground level or directly at the high altitude in flight. Conversion of the precursor gases into secondary PM is one of the pathways for the increased atmospheric PM. Atmospheric PM interacts with solar radiation altering atmospheric radiation balance and potentially contributing to global and regional climate changes. Also, direct emissions of air toxics, ozone precursors and PM from aircraft in and around civilian airports and military air bases can worsen localmore » air quality in non-attainment and/or maintenance areas. These emissions need to be quantified. However, the current EPA methods for particle emission measurements from such sources, modified Method 5 and Conditional Test Method 039, are gravimetric-based, and it is anticipated that these methods will not be suitable for current and future generations of aircraft turbine engines, whose particle mass emissions are low. To evaluate measurement approaches for military aircraft emissions, two complementary projects were initiated in 2005. A joint field campaign between these two programs was executed during the first week of October 2005 at the Kentucky Air National Guard (KYANG) base in Louisville, KY. This campaign represented the first in a series of field studies for each program funded by the DoD Strategic Environmental Research and Development Program (SERDP) and provided the basis for cross-comparison of the sampling approaches and measurement techniques employed by the respective program teams. This paper describes the overall programmatic of the multi-year SERDP aircraft emissions research and presents a summary of the results from the joint field campaign.« less

  11. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  12. Assessing the co-benefits of greenhouse gas reduction: health benefits of particulate matter related inspection and maintenance programs in Bangkok, Thailand.

    PubMed

    Li, Ying; Crawford-Brown, Douglas J

    2011-04-15

    Since the 1990s, the capital city of Thailand, Bangkok has been suffering from severe ambient particulate matter (PM) pollution mainly attributable to its wide use of diesel-fueled vehicles and motorcycles with poor emission performance. While the Thai government strives to reduce emissions from transportation through enforcing policy measures, the link between specific control policies and associated health impacts is inadequately studied. This link is especially important in exploring the co-benefits of greenhouse gas emissions reductions, which often brings reduction in other pollutants such as PM. This paper quantifies the health benefits potentially achieved by the new PM-related I/M programs targeting all diesel vehicles and motorcycles in the Bangkok Metropolitan Area (BMA). The benefits are estimated by using a framework that integrates policy scenario development, exposure assessment, exposure-response assessment and economic valuation. The results indicate that the total health damage due to the year 2000 PM emissions from vehicles in the BMA was equivalent to 2.4% of Thailand's GDP. Under the business-as-usual (BAU) scenario, total vehicular PM emissions in the BMA will increase considerably over time due to the rapid growth in vehicle population, even if the fleet average emission rates are projected to decrease over time as the result of participation of Thailand in post-Copenhagen climate change strategies. By 2015, the total health damage is estimated to increase by 2.5 times relative to the year 2000. However, control policies targeting PM emissions from automobiles, such as the PM-oriented I/M programs, could yield substantial health benefits relative to the BAU scenario, and serve as co-benefits of greenhouse gas control strategies. Despite uncertainty associated with the key assumptions used to estimate benefits, we find that with a high level confidence, the I/M programs will produce health benefits whose economic impacts considerably outweigh the expenditures on policy implementation. Copyright © 2011 Elsevier B.V. All rights reserved.

  13. 40 CFR 93.116 - Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., PM10, and PM2.5 violations (hot-spots). 93.116 Section 93.116 Protection of Environment ENVIRONMENTAL....116 Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots). (a) This paragraph... hot-spot analysis in PM10 and PM2.5 nonattainment and maintenance areas for FHWA/FTA projects that are...

  14. 40 CFR 93.116 - Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., PM10, and PM2.5 violations (hot-spots). 93.116 Section 93.116 Protection of Environment ENVIRONMENTAL....116 Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots). (a) This paragraph... hot-spot analysis in PM10 and PM2.5 nonattainment and maintenance areas for FHWA/FTA projects that are...

  15. 40 CFR 93.116 - Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., PM10, and PM2.5 violations (hot-spots). 93.116 Section 93.116 Protection of Environment ENVIRONMENTAL....116 Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots). (a) This paragraph... hot-spot analysis in PM10 and PM2.5 nonattainment and maintenance areas for FHWA/FTA projects that are...

  16. 40 CFR 93.116 - Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., PM10, and PM2.5 violations (hot-spots). 93.116 Section 93.116 Protection of Environment ENVIRONMENTAL....116 Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots). (a) This paragraph... hot-spot analysis in PM10 and PM2.5 nonattainment and maintenance areas for FHWA/FTA projects that are...

  17. 40 CFR 93.116 - Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., PM10, and PM2.5 violations (hot-spots). 93.116 Section 93.116 Protection of Environment ENVIRONMENTAL....116 Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots). (a) This paragraph... hot-spot analysis in PM10 and PM2.5 nonattainment and maintenance areas for FHWA/FTA projects that are...

  18. 75 FR 29537 - Draft Transportation Conformity Guidance for Quantitative Hot-spot Analyses in PM2.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... Quantitative Hot- spot Analyses in PM 2.5 and PM 10 Nonattainment and Maintenance Areas AGENCY: Environmental... finalized, this guidance would help state and local agencies complete quantitative PM 2.5 and PM 10 hot-spot...), EPA stated that quantitative PM 2.5 and PM 10 hot-spot analyses would not be required until EPA...

  19. The Development and Evolution of Physical Medicine and Rehabilitation in Taiwan from 1958 to 2016.

    PubMed

    Lien, I-Nan; Wu, Pei-Shen; Wang, Tyng-Guey; Chen, Ssu-Yuan; Lew, Henry L

    2017-03-01

    The field of physical medicine and rehabilitation (PM&R) began its development in Taiwan since 1958, and has gradually evolved into a profession that provides a diversity of clinical services and educational activities. The objectives of this brief report were to (1) review its background and milestones in the past 6 decades, (2) describe the current role and function of its Academy of PM&R, (3) present the content and format of its board certification process, focusing on (a) residency training requirements, (b) self-assessment examination, board certification process, and (c) maintenance of certification through continued education. Some challenges and opportunities are also discussed toward the end of this article. It is hoped that this report may serve as a reference material for other countries as they develop or improve their PM&R residency programs.

  20. 75 FR 1543 - Approval and Promulgation of Implementation Plans; Puerto Rico; Guaynabo PM10

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ...] Approval and Promulgation of Implementation Plans; Puerto Rico; Guaynabo PM 10 Limited Maintenance Plan and... approving the Limited Maintenance Plan for the Municipality of Guaynabo nonattainment area in Puerto Rico and the request by the Commonwealth of Puerto Rico to redesignate the area from nonattainment to...

  1. 40 CFR 53.4 - Applications for reference or equivalent method determinations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Required or recommended routine, periodic, and preventative maintenance and maintenance schedules. (J) Any... methods for PM 2.5 and PM 10-2,5 must be described in sufficient detail, based on the elements described... Table A-1 to this subpart) will be met throughout the warranty period and that the applicant accepts...

  2. 40 CFR 53.4 - Applications for reference or equivalent method determinations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Required or recommended routine, periodic, and preventative maintenance and maintenance schedules. (J) Any... methods for PM 2.5 and PM 10-2.5 must be described in sufficient detail, based on the elements described... Table A-1 to this subpart) will be met throughout the warranty period and that the applicant accepts...

  3. 78 FR 59841 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; West Virginia's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ...EPA is approving a redesignation request and State Implementation Plan (SIP) revision submitted by the State of West Virginia. The West Virginia Department of Environmental Protection (WVDEP) requested that the West Virginia portion of the Wheeling, WV-OH fine particulate matter (PM2.5) nonattainment area (``Wheeling Area'' or ``Area'') be redesignated as attainment for the 1997 annual PM2.5 national ambient air quality standard (NAAQS). In this rulemaking action, EPA is approving the 1997 annual PM2.5 redesignation request for the West Virginia portion of the Area. EPA is also approving the maintenance plan SIP revision that the State submitted in conjunction with its redesignation request. The maintenance plan provides for continued attainment of the 1997 annual PM2.5 NAAQS for 10 years after redesignation of the West Virginia portion of the Area. The maintenance plan includes a comprehensive emissions inventory that EPA is approving in this rulemaking. The maintenance plan also includes an insignificance determination for the onroad motor vehicle contribution of PM2.5, nitrogen oxides (NOX), and sulfur dioxide (SO2) for the West Virginia portion of the Area for purposes of transportation conformity. EPA is also approving West Virginia's insignificance determination for transportation conformity. In addition, EPA is also finding that the Area continues to attain the standard. This rulemaking action approving the 1997 annual PM2.5 NAAQS redesignation request, maintenance plan, comprehensive emissions inventory, and insignificance determination for transportation conformity for the West Virginia portion of the Area is based on EPA's determination that the Area has met the criteria for redesignation to attainment specified in the Clean Air Act (CAA).

  4. A major advance in powder metallurgy

    NASA Technical Reports Server (NTRS)

    Williams, Brian E.; Stiglich, Jacob J., Jr.; Kaplan, Richard B.; Tuffias, Robert H.

    1991-01-01

    Ultramet has developed a process which promises to significantly increase the mechanical properties of powder metallurgy (PM) parts. Current PM technology uses mixed powders of various constituents prior to compaction. The homogeneity and flaw distribution in PM parts depends on the uniformity of mixing and the maintenance of uniformity during compaction. Conventional PM fabrication processes typically result in non-uniform distribution of the matrix, flaw generation due to particle-particle contact when one of the constituents is a brittle material, and grain growth caused by high temperature, long duration compaction processes. Additionally, a significant amount of matrix material is usually necessary to fill voids and create 100 percent dense parts. In Ultramet's process, each individual particle is coated with the matrix material, and compaction is performed by solid state processing. In this program, Ultramet coated 12-micron tungsten particles with approximately 5 wt percent nickel/iron. After compaction, flexure strengths were measured 50 percent higher than those achieved in conventional liquid phase sintered parts (10 wt percent Ni/Fe). Further results and other material combinations are discussed.

  5. Application and preventive maintenance of neurology medical equipment in isfahan alzahra hospital.

    PubMed

    Alikhani, Parivash; Vesal, Sahar; Kashefi, Parviz; Pour, Ramin Etamadi; Khorvash, Fariborz; Askari, Gholamreza; Meamar, Rokhsareh

    2013-05-01

    Nowadays Medical equipment plays an important role in the treatment and in the medical education. Using outdated preventive maintenance (PM) system may cause problems in the cutting edge medical equipment, Nervous system disease's equipment (In diagnosis and treatment) which are crucial for every medical center. Based on above facts we focused on nervous system treat units' equipment and informed the supervisors and their colleagues about the latest equipment maintenance status and promoted methodical and correct method to be used for medical equipment maintenance. This research is an analytical descriptive and has been done on the base information from a particular time to past. We gathered our required information of 2009 from Alzahra Medical Center. We divided this research info 2 main phases. In the first phase, we picked out Neurosurgery and Neourology diseases medical equipment (diagnosis and therapy equipment) and in the second phase, we need to implement a methodical PM for every equipment. Research has shown that there are 19nervous system equipment in Alzahra Medical center, categorized in diagnostic (13 pcs), therapeutic (4 pcs) and diagnostic-therapeutic (2 pcs). As we declare in methods part of this research, we categorized medical equipment in Food and Drug Administration (FDA) segmentation. Capital-scarce equipment: Magnetic resonance imaging, Eco Doppler, Kamalaarak ultrasonic surgical aspirator, Stereotactic, computed tomography-scan, euroendoscope/vital-scarce equipment: Coblation, Sonoco, vaterjet/scarce equipment: Transcranial color Doppler, electroencephalogram, electromyography, surgical microscope. Survey of application and preventive maintenance of neurology medical equipment in Isfahan Alzahra hospital show there is no P.M system. Implementing a complete P.M system for this medical center is crucial to preventing cause problems for these medical equipment and decreasing maintenance costs and gaining uptime. Researchers of this article have tried to provide PM, use of texts, web and experts.

  6. 40 CFR 53.4 - Applications for reference or equivalent method determinations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Required or recommended routine, periodic, and preventative maintenance and maintenance schedules. (J) Any... methods for PM2.5 and PM10−2.5 must be described in sufficient detail, based on the elements described in... Table A-1 to this subpart) will be met throughout the warranty period and that the applicant accepts...

  7. 40 CFR 53.4 - Applications for reference or equivalent method determinations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Required or recommended routine, periodic, and preventative maintenance and maintenance schedules. (J) Any... methods for PM2.5 and PM10−2.5 must be described in sufficient detail, based on the elements described in... Table A-1 to this subpart) will be met throughout the warranty period and that the applicant accepts...

  8. 78 FR 72879 - Adequacy Status of the Submitted Redesignation Requests and Maintenance Plans for the Charleston...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ...In this notice, EPA is notifying the public that EPA has made insignificance findings through the transportation conformity adequacy process, under the Clean Air Act (CAA), for directly emitted fine particulate matter (PM2.5) and nitrogen oxides (NOX) in the Charleston, West Virginia 1997 and 2006 PM2.5 national ambient air quality standards (NAAQS) nonattainment area. West Virginia submitted the insignificance findings with the redesignation requests and maintenance plans submittal on December 6, 2012. As a result of EPA's findings, the Charleston, West Virginia nonattainment area is no longer required to perform a regional emissions analysis for directly emitted PM2.5, or NOX, as part of future PM2.5 conformity determinations for the 1997 and 2006 PM2.5 NAAQS.

  9. 40 CFR 52.1620 - Identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... maintenance and PSD measures in any other state. Interstate transport for the 1997 ozone and PM2.5 NAAQS New Mexico 9/17/2007 11/26/2010, 75 FR 72688 Revisions to prohibit interference with maintenance and PSD... for PSD for the 1997 and 2008 Ozone and the 1997 and 2006 PM2.5 NAAQS Bernalillo County 8/16/2010 8/19...

  10. 77 FR 76415 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Redesignation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ...EPA is approving a redesignation request and State Implementation Plan (SIP) revision submitted by the State of West Virginia. The West Virginia Department of Environmental Protection (WVDEP) requested that the West Virginia portion of the Huntington- Ashland, WV-KY-OH fine particulate matter (PM2.5) nonattainment area (``Huntington-Ashland Area'' or ``Area'') be redesignated as attainment for the 1997 annual PM2.5 national ambient air quality standard (NAAQS). In this rulemaking action, EPA is approving the 1997 annual PM2.5 redesignation request for the West Virginia portion of the Area. EPA is also approving the maintenance plan SIP revision that the State submitted in conjunction with its redesignation request. The maintenance plan provides for continued attainment of the 1997 annual PM2.5 NAAQS for 10 years after redesignation of the West Virginia portion of the Area. The maintenance plan includes an insignificance determination for the onroad motor vehicle contribution of PM2.5, nitrogen oxides (NOX), and sulfur dioxide (SO2) for the West Virginia portion of the Area for purposes of transportation conformity. EPA is approving West Virginia's insignificance determination for transportation conformity. EPA is also finding that the Area continues to attain the standard. This rulemaking action approving the 1997 annual PM2.5 NAAQS redesignation request, maintenance plan, and insignificance determination for transportation conformity for the West Virginia portion of the Area is based on EPA's determination that the Area has met the criteria for redesignation to attainment specified in the Clean Air Act (CAA).

  11. 76 FR 46288 - Adequacy Determination for Colorado Springs, Cañon City, Greeley, Pagosa Springs, and Telluride...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-02

    ... Springs, Ca[ntilde]on City, Greeley, Pagosa Springs, and Telluride; Carbon Monoxide and PM 10 Maintenance... transportation conformity purposes: ``Revised Carbon Monoxide Attainment/Maintenance Plan Colorado Springs Attainment/ Maintenance Area'' and ``Revised Carbon Monoxide Maintenance Plan Greeley Attainment/Maintenance...

  12. Neurocognitive systems related to real-world prospective memory.

    PubMed

    Kalpouzos, Grégoria; Eriksson, Johan; Sjölie, Daniel; Molin, Jonas; Nyberg, Lars

    2010-10-08

    Prospective memory (PM) denotes the ability to remember to perform actions in the future. It has been argued that standard laboratory paradigms fail to capture core aspects of PM. We combined functional MRI, virtual reality, eye-tracking and verbal reports to explore the dynamic allocation of neurocognitive processes during a naturalistic PM task where individuals performed errands in a realistic model of their residential town. Based on eye movement data and verbal reports, we modeled PM as an iterative loop of five sustained and transient phases: intention maintenance before target detection (TD), TD, intention maintenance after TD, action, and switching, the latter representing the activation of a new intention in mind. The fMRI analyses revealed continuous engagement of a top-down fronto-parietal network throughout the entire task, likely subserving goal maintenance in mind. In addition, a shift was observed from a perceptual (occipital) system while searching for places to go, to a mnemonic (temporo-parietal, fronto-hippocampal) system for remembering what actions to perform after TD. Updating of the top-down fronto-parietal network occurred at both TD and switching, the latter likely also being characterized by frontopolar activity. Taken together, these findings show how brain systems complementary interact during real-world PM, and support a more complete model of PM that can be applied to naturalistic PM tasks and that we named PROspective MEmory DYnamic (PROMEDY) model because of its dynamics on both multi-phase iteration and the interactions of distinct neurocognitive networks.

  13. Two-machine flow shop scheduling integrated with preventive maintenance planning

    NASA Astrophysics Data System (ADS)

    Wang, Shijin; Liu, Ming

    2016-02-01

    This paper investigates an integrated optimisation problem of production scheduling and preventive maintenance (PM) in a two-machine flow shop with time to failure of each machine subject to a Weibull probability distribution. The objective is to find the optimal job sequence and the optimal PM decisions before each job such that the expected makespan is minimised. To investigate the value of integrated scheduling solution, computational experiments on small-scale problems with different configurations are conducted with total enumeration method, and the results are compared with those of scheduling without maintenance but with machine degradation, and individual job scheduling combined with independent PM planning. Then, for large-scale problems, four genetic algorithm (GA) based heuristics are proposed. The numerical results with several large problem sizes and different configurations indicate the potential benefits of integrated scheduling solution and the results also show that proposed GA-based heuristics are efficient for the integrated problem.

  14. Guidance for creating annual on-road mobile source emission inventories for PM2.5 nonattainment areas for use in SIPs and conformity.

    DOT National Transportation Integrated Search

    2005-08-01

    The purpose of this document is to provide areas that are nonattainment or maintenance for the annual PM2.5 national ambient air quality standard (standard) with guidance on developing annual PM2.5 on-road motor vehicle emissions estimates to m...

  15. Data Mining CMMSs: How to Convert Data into Knowledge.

    PubMed

    Fennigkoh, Larry; Nanney, D Courtney

    2018-01-01

    Although the healthcare technology management (HTM) community has decades of accumulated medical device-related maintenance data, little knowledge has been gleaned from these data. Finding and extracting such knowledge requires the use of the well-established, but admittedly somewhat foreign to HTM, application of inferential statistics. This article sought to provide a basic background on inferential statistics and describe a case study of their application, limitations, and proper interpretation. The research question associated with this case study involved examining the effects of ventilator preventive maintenance (PM) labor hours, age, and manufacturer on needed unscheduled corrective maintenance (CM) labor hours. The study sample included more than 21,000 combined PM inspections and CM work orders on 2,045 ventilators from 26 manufacturers during a five-year period (2012-16). A multiple regression analysis revealed that device age, manufacturer, and accumulated PM inspection labor hours all influenced the amount of CM labor significantly (P < 0.001). In essence, CM labor hours increased with increasing PM labor. However, and despite the statistical significance of these predictors, the regression analysis also indicated that ventilator age, manufacturer, and PM labor hours only explained approximately 16% of all variability in CM labor, with the remainder (84%) caused by other factors that were not included in the study. As such, the regression model obtained here is not suitable for predicting ventilator CM labor hours.

  16. Region 10: Idaho Northern Ada County Adequate Letter (6/21/2013)

    EPA Pesticide Factsheets

    EPA approves motor vehicle emissions budget in the Northern Ada County PM10 State Implementation Plan, Maintenance Plan: Ten-Year Update for PM10 national ambient air quality standard, adequate for transportation conformity purposes.

  17. Four-Week Strategy-Based Training to Enhance Prospective Memory in Older Adults: Targeting Intention Retention Is More Beneficial than Targeting Intention Formation.

    PubMed

    Ihle, Andreas; Albiński, Rafal; Gurynowicz, Kamila; Kliegel, Matthias

    2018-01-01

    So far, training of prospective memory (PM) focused on very short instances (single sessions) and targeted the intention-formation phase only. We aimed to compare the effectiveness of 2 different 4-week strategy-based PM training types, namely imagery training (targeting the encoding of the PM intention in the intention-formation phase) versus rehearsal training (targeting the maintenance of the PM intention in the intention-retention phase) in older adults. We used a 4-week training protocol (8 sessions in total, 2 sessions per week). From the 44 participants, 21 were randomly assigned to the imagery training (vividly imagining a mental picture to memorize the connection between the PM cue words and related actions during intention formation) and 23 to the rehearsal training (rehearsing the PM cue words during intention retention). The criterion PM task was assessed before and after the training. Comparing the effectiveness of both training types, we found a significant time by training type interaction on PM accuracy in terms of PM cue detection, F(1, 42) = 6.07, p = 0.018, η2p = 0.13. Subsequent analyses revealed that the rehearsal training was more effective in enhancing PM accuracy in terms of PM cue detection than the imagery training. Strategy-based PM training in older adults targeting the maintenance of the PM intention in the intention-retention phase may be more effective in enhancing PM accuracy in terms of PM cue detection than the strategy targeting the encoding of the PM intention in the intention-formation phase. This suggests that for successful prospective remembering, older adults may need more support to keep the PM cues active in memory while working on the ongoing task than to initially encode the PM intention. © 2018 S. Karger AG, Basel.

  18. 78 FR 38223 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ... demonstration showing how the area will continue to attain the 24-hour PM 10 NAAQS for at least 10 years beyond...; California; South Coast Air Basin; Approval of PM 10 Maintenance Plan and Redesignation to Attainment for the PM 10 Standard AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is...

  19. Barrow Black Carbon Source and Impact Study Final Campaign Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barrett, Tate

    2014-07-01

    The goal of the Barrow Black Carbon Source and Impact (BBCSI) Study was to characterize the concentration and isotopic composition of carbonaceous atmospheric particulate matter (PM) at the Atmospheric Radiation Measurement site in Barrow, AK. The carbonaceous component was characterized via measurement of the organic and black carbon (OC and BC) components of the total PM. To facilitate complete characterization of the particulate matter, filter-based collections were used, including a medium volume PM2.5 sampler and a high volume PM10 sampler. Thirty-eight fine (PM2.5) and 49 coarse (PM10) particulate matter fractions were collected at weekly and bi-monthly intervals. The PM2.5 samplermore » operated with minimal maintenance during the 12 month campaign. The PM10 sampler used for the BBCSI used standard Tisch hi-vol motors which have a known lifetime of ~1 month under constant use; this necessitated monthly maintenance and it is suggested that the motors be upgraded to industrial blowers for future deployment in the Arctic. The BBCSI sampling campaign successfully collected and archived 87 ambient atmospheric particulate matter samples from Barrow, AK from July 2012 to June 2013. Preliminary analysis of the organic and black carbon concentrations has been completed. This campaign confirmed known trends of high BC lasting from the winter through to spring haze periods and low BC concentrations in the summer.« less

  20. Maintenance Downtime April 23, 2014

    Atmospheric Science Data Center

    2014-04-23

    Date(s):  Wednesday, April 23, 2014 Time:  7:00 am - 5:00 pm EDT Event ... Due to scheduled maintenance Wednesday, April 23, 2014: The Data Pool, MISR order and browse tools, TES and MOPITT Search ...

  1. 77 FR 31351 - Adequacy Determination for Aspen PM10 and Fort Collins Carbon Monoxide Maintenance Plans' Motor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ...[bdi1][bdi0] and Fort Collins Carbon Monoxide Maintenance Plans' Motor Vehicle Emissions Budgets for... Aspen Attainment/Maintenance Area'' \\1\\ and its motor vehicle emissions budget, and the ``Revised Carbon... which we determine whether a SIP revision's motor vehicle emissions budget (MVEB) is adequate for...

  2. 78 FR 37717 - Adequacy Status of the Submitted 2009 and 2025 PM2.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... control strategy implementation plan revision or maintenance plan was endorsed by the Governor (or his or...) Before the control strategy implementation plan or maintenance plan was submitted to EPA, consultation... maintenance: Both the 2009 and 2025 budgets are less than the on-road mobile source inventory for 2007 that...

  3. 40 CFR 52.725 - Control strategy: Particulates.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requests to redesignate the Granite City Particulate Matter (PM) nonattainment area to attainment status... Granite City area to ensure continued attainment of the NAAQS. The redesignation request and maintenance... the Lake Calumet (SE Chicago), McCook, and Granite City, Illinois, Particulate Matter (PM...

  4. 40 CFR 52.725 - Control strategy: Particulates.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requests to redesignate the Granite City Particulate Matter (PM) nonattainment area to attainment status... Granite City area to ensure continued attainment of the NAAQS. The redesignation request and maintenance... the Lake Calumet (SE Chicago), McCook, and Granite City, Illinois, Particulate Matter (PM...

  5. 40 CFR 52.725 - Control strategy: Particulates.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requests to redesignate the Granite City Particulate Matter (PM) nonattainment area to attainment status... Granite City area to ensure continued attainment of the NAAQS. The redesignation request and maintenance... the Lake Calumet (SE Chicago), McCook, and Granite City, Illinois, Particulate Matter (PM...

  6. 40 CFR 52.725 - Control strategy: Particulates.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requests to redesignate the Granite City Particulate Matter (PM) nonattainment area to attainment status... Granite City area to ensure continued attainment of the NAAQS. The redesignation request and maintenance... the Lake Calumet (SE Chicago), McCook, and Granite City, Illinois, Particulate Matter (PM...

  7. Region 2: Puerto Rico Adequate Letter (8/25/2009)

    EPA Pesticide Factsheets

    This is a letter from Ronald Borsellino, Acting Director, to Pedro J. Nieves Miranda regarding a limited maintenance plan as the maintenance plan in support of the redesignation for the Municipality of Guaynabo PM10.

  8. DISINFECTION BY-PRODUCT CONTROL THROUGH BIOLOGICAL FILTRATION

    EPA Science Inventory

    Disinfection by-product (DBP) control through biofiltration is defined as the removal of DBP precursor mateterial (PM) by bacteria attached to the filte nedia. The PM consists of dissolved organic matter (DOM) and is utilized by the filter bacteria as a substrate for cell mainten...

  9. Drosophila E-cadherin is required for the maintenance of ring canals anchoring to mechanically withstand tissue growth.

    PubMed

    Loyer, Nicolas; Kolotuev, Irina; Pinot, Mathieu; Le Borgne, Roland

    2015-10-13

    Intercellular bridges called "ring canals" (RCs) resulting from incomplete cytokinesis play an essential role in intercellular communication in somatic and germinal tissues. During Drosophila oogenesis, RCs connect the maturing oocyte to nurse cells supporting its growth. Despite numerous genetic screens aimed at identifying genes involved in RC biogenesis and maturation, how RCs anchor to the plasma membrane (PM) throughout development remains unexplained. In this study, we report that the clathrin adaptor protein 1 (AP-1) complex, although dispensable for the biogenesis of RCs, is required for the maintenance of the anchorage of RCs to the PM to withstand the increased membrane tension associated with the exponential tissue growth at the onset of vitellogenesis. Here we unravel the mechanisms by which AP-1 enables the maintenance of RCs' anchoring to the PM during size expansion. We show that AP-1 regulates the localization of the intercellular adhesion molecule E-cadherin and that loss of AP-1 causes the disappearance of the E-cadherin-containing adhesive clusters surrounding the RCs. E-cadherin itself is shown to be required for the maintenance of the RCs' anchorage, a function previously unrecognized because of functional compensation by N-cadherin. Scanning block-face EM combined with transmission EM analyses reveals the presence of interdigitated, actin- and Moesin-positive, microvilli-like structures wrapping the RCs. Thus, by modulating E-cadherin trafficking, we show that the sustained E-cadherin-dependent adhesion organizes the microvilli meshwork and ensures the proper attachment of RCs to the PM, thereby counteracting the increasing membrane tension induced by exponential tissue growth.

  10. Drosophila E-cadherin is required for the maintenance of ring canals anchoring to mechanically withstand tissue growth

    PubMed Central

    Loyer, Nicolas; Kolotuev, Irina; Pinot, Mathieu; Le Borgne, Roland

    2015-01-01

    Intercellular bridges called “ring canals” (RCs) resulting from incomplete cytokinesis play an essential role in intercellular communication in somatic and germinal tissues. During Drosophila oogenesis, RCs connect the maturing oocyte to nurse cells supporting its growth. Despite numerous genetic screens aimed at identifying genes involved in RC biogenesis and maturation, how RCs anchor to the plasma membrane (PM) throughout development remains unexplained. In this study, we report that the clathrin adaptor protein 1 (AP-1) complex, although dispensable for the biogenesis of RCs, is required for the maintenance of the anchorage of RCs to the PM to withstand the increased membrane tension associated with the exponential tissue growth at the onset of vitellogenesis. Here we unravel the mechanisms by which AP-1 enables the maintenance of RCs’ anchoring to the PM during size expansion. We show that AP-1 regulates the localization of the intercellular adhesion molecule E-cadherin and that loss of AP-1 causes the disappearance of the E-cadherin–containing adhesive clusters surrounding the RCs. E-cadherin itself is shown to be required for the maintenance of the RCs’ anchorage, a function previously unrecognized because of functional compensation by N-cadherin. Scanning block-face EM combined with transmission EM analyses reveals the presence of interdigitated, actin- and Moesin-positive, microvilli-like structures wrapping the RCs. Thus, by modulating E-cadherin trafficking, we show that the sustained E-cadherin–dependent adhesion organizes the microvilli meshwork and ensures the proper attachment of RCs to the PM, thereby counteracting the increasing membrane tension induced by exponential tissue growth. PMID:26424451

  11. Extended Maintenance Downtime 12/09 - 12/16

    Atmospheric Science Data Center

    2016-12-05

    Date(s):  Friday, December 9, 2016 to Friday, December 16, 2016 Time:  12/09 @ 7 am - 12/16 @ 5 pm EDT Event Impact:  The ASDC would like to perform a comprehensive and required maintenance from Friday...

  12. Extended Maintenance Downtime 08/12 - 08/19

    Atmospheric Science Data Center

    2016-08-03

    Date(s):  Tuesday, August 2, 2016 to Friday, August 19, 2016 Time:  08/12 @ 7 am - 08/19 @ 5 pm EST Event Impact:  The ASDC would like to perform a comprehensive and required maintenance from Friday...

  13. Extended Maintenance Downtime 01/19 - 01/26

    Atmospheric Science Data Center

    2018-01-24

    Date(s):  Friday, January 19, 2018 to Friday, January 26, 2018 Time:  01/19 @ 7 am - 01/26 @ 5 pm EDT Event Impact:  The ASDC would like to perform a comprehensive and required maintenance from Friday...

  14. 76 FR 24475 - Adequacy Status of the Hickory-Morganton-Lenoir, North Carolina 1997 Annual PM2.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ...In this notice, EPA is notifying the public of its finding that the nitrogen oxides (NOX) motor vehicle emissions budgets (MVEBs) in the Hickory-Morganton-Lenoir, North Carolina area (hereafter referred to as the ``Hickory Area'') maintenance plan for the 1997 annual PM2.5 standard, submitted on December 18, 2009, and supplemented on December 22, 2010, by the North Carolina Department of Environment and Natural Resources (NCDENR) are adequate for transportation conformity purposes. EPA is also making an insignificance finding for direct fine particulate (PM2.5) through the transportation conformity adequacy process for the Hickory Area. The Hickory Area is comprised of the entire county of Catawba in North Carolina. On March 2, 1999, the District of Columbia Circuit Court ruled that submitted state implementation plans (SIPs) cannot be used for transportation conformity determinations until EPA has affirmatively found them adequate. As a result of EPA's finding, the Hickory Area must use the NOX MVEBs from the submitted maintenance plan and supplement for the Hickory Area for future conformity determinations. Additionally, as a result of this finding, the Hickory Area is not required to perform a regional emissions analysis for direct PM2.5 in future PM2.5 transportation conformity determinations for the 1997 annual PM2.5 standard.

  15. Region 8: Colorado Denver, Pagosa Springs and Telluride Adequate Letter (8/18/2000)

    EPA Pesticide Factsheets

    This letter from EPA to Colorado Department of Public Health and Environment determined Denvers' Carbon Monoxide (CO) maintenance plan, Pagosa Springs and Tellurides' Particulate Matter (PM10) maintenance plans for Motor Vehicle Emissions Budgets adequate

  16. 76 FR 72404 - Adequacy Status of Motor Vehicle Emissions Budgets in Submitted PM10

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9495-4] Adequacy Status of Motor Vehicle Emissions Budgets in Submitted PM 10 Maintenance Plan for Sacramento County; CA AGENCY: Environmental Protection Agency (EPA... found that the motor vehicle emissions budgets (MVEBs) for particulate matter with an aerodynamic...

  17. Frequently Asked Questions about Physical Medicine and Rehabilitation

    MedlinePlus

    ... the Medical Student Program Resources for Foreign Medical Student Graduates Interested in PM&R PM&R Residency Programs PM&R Programs Map Career Resources and Tools Job and Fellowship Fair Compensation Survey News & Publications PM&R Journal PM&R Journal ...

  18. 76 FR 6328 - Official Release of the January 2011 AP-42 Method for Estimating Re-Entrained Road Dust From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... Nonattainment and Maintenance Areas'' (EPA-420-B-10-040, December 2010). \\2\\ For estimating road dust from... maintenance areas and any PM 2.5 nonattainment and maintenance areas where re-entrained road dust is a... January 2011 AP-42 Method for Estimating Re-Entrained Road Dust From Paved Roads AGENCY: Environmental...

  19. 77 FR 8877 - ICD-9-CM Coordination and Maintenance (C&M) Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... Coordination and Maintenance (C&M) Committee Meeting National Center for Health Statistics (NCHS... Coordination and Maintenance (C&M) Committee meeting. Time and Date: 9 a.m.-5:30 p.m., March 5, 2012. Place... entering the building. Attendees who wish to attend the ICD- 9-CM C&M meeting on March 5, 2012, must submit...

  20. Performance of preventive maintenance treatments for flexible pavements in Texas.

    DOT National Transportation Integrated Search

    2017-03-01

    This report documents the work performed in the first year of the Texas Department of TxDOT Project 0-6878. : The main objective of this project is to quantify the effectiveness of various popular preventive maintenance : (PM) treatments under varyin...

  1. Filtration and clogging of permeable pavement loaded by urban drainage.

    PubMed

    Sansalone, J; Kuang, X; Ying, G; Ranieri, V

    2012-12-15

    Permeable pavement, as a sustainable infrastructure material can promote hydrologic restoration, particulate matter (PM) and solute control. However, filtration and commensurate clogging are two aspects of continued interest and discussion. This study quantifies filtration and clogging of cementitious permeable pavement (CPP) for loadings from 50 to 200 mg/L of hetero-disperse sandy-silt PM. The CPP mix design provides a hetero-disperse pore size distribution (PSD)(pore), effective porosity (φ(e)) of 24% and median pore size of 658 μm with a standard deviation of 457 μm. The PM mass separation across the entire particle size distribution (PSD)(PM) exceeds 80%; with complete separation for PM greater than 300 μm and 50% separation for suspended PM. Turbidity is reduced (42-95%), and effluent is below 10 NTU in the first quartile of a loading period. Permeable pavement illustrates reductions in initial (clean-bed) hydraulic conductivity (k(0)) with loading time. For all PM loadings, k(0) (3.1 × 10(-1) mm/s) was reduced to 10(-4) mm/s for runoff loading durations from 100 to 250 h, respectively. Temporal hydraulic conductivity (k) follows exponential profiles. Maintenance by vacuuming and sonication illustrate that 96-99% of k(0) is recovered. Permeable pavement constitutive properties integrated with measured PM loads and a year of continuous rainfall-runoff simulation illustrate k reduction with historical loadings. Study results measure and model filtration and hydraulic conductivity phenomena as well as maintenance requirements of permeable pavement directly loaded by urban drainage. Copyright © 2011. Published by Elsevier Ltd.

  2. Motility and stem cell properties induced by the epithelial-mesenchymal transition require destabilization of lipid rafts

    PubMed Central

    Prijic, Sara; Chen, Xiaoling; Levental, Ilya; Chang, Jeffrey T.

    2016-01-01

    The Epithelial-Mesenchymal Transition (EMT) is a developmental program that provides cancer cells with the characteristics necessary for metastasis, including increased motility and stem cell properties. The cellular and molecular mechanisms underlying this process are not yet fully understood, hampering efforts to develop therapeutics. In recent years, it has become apparent that EMT is accompanied by wholesale changes in diverse signaling pathways that are initiated by proteins at the plasma membrane (PM). The PM contains thousands of lipid and protein species that are dynamically and spatially organized into lateral membrane domains, an example of which are lipid rafts. Since one of the major functions of rafts is modulation of signaling originating at the PM, we hypothesized that the signaling changes occurring during an EMT are associated with alterations in PM organization. To test this hypothesis, we used Giant Plasma Membrane Vesicles (GPMVs) to study the organization of intact plasma membranes isolated from live cells. We observed that induction of EMT significantly destabilized lipid raft domains. Further, this reduction in stability was crucial for the maintenance of the stem cell phenotype and EMT-induced remodeling of PM-orchestrated pathways. Exogenously increasing raft stability by feeding cells with ω-3 polyunsaturated fatty acid docosahexaenoic acid (DHA) repressed these phenotypes without altering EMT markers, and inhibited the metastatic capacity of breast cancer cells. Hence, modulating raft properties regulates cell phenotype, suggesting a novel approach for targeting the impact of EMT in cancer. PMID:27303921

  3. Extended Maintenance Downtime 12/14 - 12/18

    Atmospheric Science Data Center

    2015-12-07

    ... am - 12/18 @ 5 pm EST Event Impact:  File System Maintenance will be performed on a number of the large file systems ... and Customization Tool -  AMAPS, CALIPSO, CERES, MOPITT, TES and TAD Search and Subset Tools   While some sites and tools may ...

  4. Extended Maintenance Downtime 02/29 - 03/04

    Atmospheric Science Data Center

    2016-02-22

    ... @ 8am - 03/04 @ 4pm EST Event Impact:  System Maintenance will be performed at the ASDC the week of February 29th ... and Customization Tool -  AMAPS, CALIPSO, CERES, MOPITT, TES and TAD Search and Subset Tools   While some sites and tools may ...

  5. Golgi and plasma membrane pools of PI(4)P contribute to plasma membrane PI(4,5)P2 and maintenance of KCNQ2/3 ion channel current

    PubMed Central

    Dickson, Eamonn J.; Jensen, Jill B.; Hille, Bertil

    2014-01-01

    Plasma membrane (PM) phosphatidylinositol 4,5-bisphosphate [PI(4,5)P2] regulates the activity of many ion channels and other membrane-associated proteins. To determine precursor sources of the PM PI(4,5)P2 pool in tsA-201 cells, we monitored KCNQ2/3 channel currents and translocation of PHPLCδ1 domains as real-time indicators of PM PI(4,5)P2, and translocation of PHOSH2×2, and PHOSH1 domains as indicators of PM and Golgi phosphatidylinositol 4-phosphate [PI(4)P], respectively. We selectively depleted PI(4)P pools at the PM, Golgi, or both using the rapamycin-recruitable lipid 4-phosphatases. Depleting PI(4)P at the PM with a recruitable 4-phosphatase (Sac1) results in a decrease of PI(4,5)P2 measured by electrical or optical indicators. Depleting PI(4)P at the Golgi with the 4-phosphatase or disrupting membrane-transporting motors induces a decline in PM PI(4,5)P2. Depleting PI(4)P simultaneously at both the Golgi and the PM induces a larger decrease of PI(4,5)P2. The decline of PI(4,5)P2 following 4-phosphatase recruitment takes 1–2 min. Recruiting the endoplasmic reticulum (ER) toward the Golgi membranes mimics the effects of depleting PI(4)P at the Golgi, apparently due to the trans actions of endogenous ER Sac1. Thus, maintenance of the PM pool of PI(4,5)P2 appears to depend on precursor pools of PI(4)P both in the PM and in the Golgi. The decrease in PM PI(4,5)P2 when Sac1 is recruited to the Golgi suggests that the Golgi contribution is ongoing and that PI(4,5)P2 production may be coupled to important cell biological processes such as membrane trafficking or lipid transfer activity. PMID:24843134

  6. Economic Statistical Design of Integrated X-bar-S Control Chart with Preventive Maintenance and General Failure Distribution

    PubMed Central

    Caballero Morales, Santiago Omar

    2013-01-01

    The application of Preventive Maintenance (PM) and Statistical Process Control (SPC) are important practices to achieve high product quality, small frequency of failures, and cost reduction in a production process. However there are some points that have not been explored in depth about its joint application. First, most SPC is performed with the X-bar control chart which does not fully consider the variability of the production process. Second, many studies of design of control charts consider just the economic aspect while statistical restrictions must be considered to achieve charts with low probabilities of false detection of failures. Third, the effect of PM on processes with different failure probability distributions has not been studied. Hence, this paper covers these points, presenting the Economic Statistical Design (ESD) of joint X-bar-S control charts with a cost model that integrates PM with general failure distribution. Experiments showed statistically significant reductions in costs when PM is performed on processes with high failure rates and reductions in the sampling frequency of units for testing under SPC. PMID:23527082

  7. Chemical Stockpile Disposal Program. Risk Analysis of the Onsite Disposal of Chemical Munitions.

    DTIC Science & Technology

    1987-08-01

    F-l7. Cartridge, mortar , 4.2-in., HT, M2/M2Al 0 F-20 M 4v M-Cs nAA PAA L4 vk I ,;t -,0 Fig. -18. .2-i. morars re stred n fibr tues wih I[w tue pr...Demilitarization PI periodic inspection PM periodic maintenance PMD projectile/ mortar disassembly PRA probabilistic risk assessment PUDA Pueblo Depot Activity RDC...Projectiles and Mortars .......... 3-8 ix * L L 3.2.4. Bombs ................... 3-8 ) 3.2.5. Spray Tanks .... ................ . 3-8 3.2.6. Bulk Agent

  8. Neural bases of prospective memory: a meta-analysis and the "Attention to Delayed Intention" (AtoDI) model.

    PubMed

    Cona, Giorgia; Scarpazza, Cristina; Sartori, Giuseppe; Moscovitch, Morris; Bisiacchi, Patrizia Silvia

    2015-05-01

    Remembering to realize delayed intentions is a multi-phase process, labelled as prospective memory (PM), and involves a plurality of neural networks. The present study utilized the activation likelihood estimation method of meta-analysis to provide a complete overview of the brain regions that are consistently activated in each PM phase. We formulated the 'Attention to Delayed Intention' (AtoDI) model to explain the neural dissociation found between intention maintenance and retrieval phases. The dorsal frontoparietal network is involved mainly in the maintenance phase and seems to mediate the strategic monitoring processes, such as the allocation of top-down attention both towards external stimuli, to monitor for the occurrence of the PM cues, and to internal memory contents, to maintain the intention active in memory. The ventral frontoparietal network is recruited in the retrieval phase and might subserve the bottom-up attention captured externally by the PM cues and, internally, by the intention stored in memory. Together with other brain regions (i.e., insula and posterior cingulate cortex), the ventral frontoparietal network would support the spontaneous retrieval processes. The functional contribution of the anterior prefrontal cortex is discussed extensively for each PM phase. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. The Failure of Deactivating Intentions: Aftereffects of Completed Intentions in the Repeated Prospective Memory Cue Paradigm

    ERIC Educational Resources Information Center

    Walser, Moritz; Fischer, Rico; Goschke, Thomas

    2012-01-01

    We used a newly developed experimental paradigm to investigate aftereffects of completed intentions on subsequent performance that required the maintenance and execution of new intentions. Participants performed an ongoing number categorization task and an additional prospective memory (PM) task, which required them to respond to PM cues that…

  10. 78 FR 4341 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Alabama Department of Environmental Management (ADEM), Air Division, to redesignate the Birmingham fine... implementation plan (SIP) to include the 1997 Annual PM 2.5 maintenance plan for the Birmingham Area that... action also approves the 2009 emissions inventory submitted with the maintenance plan. DATES: Effective...

  11. 78 FR 5306 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... the Alabama Department of Environmental Management (ADEM), Air Division, to redesignate the Birmingham... implementation plan (SIP) to include the 2006 24-hour PM 2.5 maintenance plan for the Birmingham Area that... action also approves the 2009 emissions inventory submitted with the maintenance plan. DATES: Effective...

  12. 77 FR 25164 - Adequacy Status of the Eagle River, Alaska Particulate Matter Limited Maintenance Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-R10-OAR-2010-1914; FRL-9664-7] Adequacy Status of the Eagle River, Alaska Particulate Matter Limited Maintenance Plan for Transportation Conformity Purposes AGENCY... notifying the public of its finding that the Eagle River, Alaska, Particulate Matter (PM 10 ) Limited...

  13. Modulation of a Fronto-Parietal Network in Event-Based Prospective Memory: An rTMS Study

    ERIC Educational Resources Information Center

    Bisiacchi, P. S.; Cona, G.; Schiff, S.; Basso, D.

    2011-01-01

    Event-based prospective memory (PM) is a multi-component process that requires remembering the delayed execution of an intended action in response to a pre-specified PM cue, while being actively engaged in an ongoing task. Some neuroimaging studies have suggested that both prefrontal and parietal areas are involved in the maintenance and…

  14. Are green building features safe for preventive maintenance workers? Examining the evidence.

    PubMed

    Omar, Mohamed Shamun; Quinn, Margaret M; Buchholz, Bryan; Geiser, Ken

    2013-04-01

    Many newly constructed green buildings (GB) are certified using the United States Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED) rating system for new construction and major renovation which focuses on architectural and mechanical design to conserve energy, reduce environmental harm, and enhance indoor quality for occupants. This study evaluated the preventive maintenance (PM) worker occupational safety and health (OSH) risks related to the design of GB. PM job hazard analyses (JHA) were performed on the tasks required to operate and maintain five GB features selected from 13 LEED certified GB. A 22-item JHA and OSH risk scoring system were developed. Potentially serious OSH hazards included: green roofs made of slippery material without fall protection; energy recovery wheels and storm water harvesting systems in confined spaces; skylights without guard rails; and tight geothermal well mechanical rooms constraining safe preventive practices. GB can present PM OSH risks and these should be eliminated in the building design phase. Copyright © 2013 Wiley Periodicals, Inc.

  15. Interprofessional population health advocacy: Developing and implementing a panel management curriculum in five Veterans Administration primary care practices.

    PubMed

    Dulay, Maya; Bowen, Judith L; Weppner, William G; Eastburn, Abigail; Poppe, Anne P; Spanos, Pete; Wojtaszek, Danielle; Printz, Destiny; Kaminetzky, Catherine P

    2018-05-10

    Health care systems expect primary care clinicians to manage panels of patients and improve population health, yet few have been trained to do so. An interprofessional panel management (PM) curriculum is one possible strategy to address this training gap and supply future primary care practices with clinicians and teams prepared to work together to improve the health of individual patients and populations. This paper describes a Veterans Administration (VA) sponsored multi-site interprofessional PM curriculum development effort. Five VA Centers of Excellence in Primary Care Education collaborated to identify a common set of interprofessionally relevant desired learning outcomes (DLOs) for the PM and to develop assessment instruments for monitoring trainees' PM learning. Authors cataloged teaching and learning activities across sites. Results from pilot testing were systematically discussed leading to iterative revisions of curricular elements. Authors completed a retrospective self-assessment of curriculum implementation for the academic year 2015-16 using a 5-point scale: contemplation (score = 0), pilot (1), action (2), maintenance (3), and embedded (4). Implementation scores were analyzed using descriptive statistics. DLOs were organized into five categories (individual patients, populations, guidelines/measures, teamwork, and improvement) along with a developmental continuum and mapped to program competencies. Instruction and implementation varied across sites based on resources and priorities. Between 2015 and 2016, 159 trainees (internal medicine residents, nurse practitioner students and residents, pharmacy residents, and psychology post-doctoral fellows) participated in the PM curriculum. Curriculum implementation scores for guidelines/measures and improvement DLOs were similar for all trainees; scores for individual patients, populations, and teamwork DLOs were more advanced for nurse practitioner and physician trainees. In conclusion, collaboratively identified DLOs for PM guided development of assessment instruments and instructional approaches for panel management activities in interprofessional teams. This PM curriculum and associated tools provide resources for educators in other settings.

  16. Different Coefficients and Exponents for Metabolic Body Weight in a Model to Estimate Individual Feed Intake for Growing-finishing Pigs

    PubMed Central

    Lee, S. A.; Kong, C.; Adeola, O.; Kim, B. G.

    2016-01-01

    Estimation of feed intake (FI) for individual animals within a pen is needed in situations where more than one animal share a feeder during feeding trials. A partitioning method (PM) was previously published as a model to estimate the individual FI (IFI). Briefly, the IFI of a pig within the pen was calculated by partitioning IFI into IFI for maintenance (IFIm) and IFI for growth. In the PM, IFIm is determined based on the metabolic body weight (BW), which is calculated using the coefficient of 106 and exponent of 0.75. Two simulation studies were conducted to test the hypothesis that the use of different coefficients and exponents for metabolic BW to calculate IFIm improves the accuracy of the estimates of IFI for pigs, and that PM is applied to pigs fed in group-housing systems. The accuracy of prediction represented by difference between actual and estimated IFI was compared using PM, ratio (RM), or averaging method (AM). In simulation studies 1 and 2, the PM estimated IFI better than the AM and RM during most of the periods (p<0.05). The use of 0.60 as the exponent and the coefficient of 197 to calculate metabolic BW did not improve the accuracy of the IFI estimates in both simulation studies 1 and 2. The results imply that the use of 197 kcal×kg BW0.60 as metabolizable energy for maintenance in PM does not improve the accuracy of IFI estimations compared with the use of 106 kcal×kg BW0.75 and that the PM estimates the IFI of pigs with greater accuracy compared with the averaging or ratio methods in group-housing systems. PMID:27608642

  17. 77 FR 23619 - Approval and Promulgation of Implementation Plans; Alabama: Removal of State Low-Reid Vapor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... Alabama Department of Environmental Management (ADEM), on January 10, 2012, for parallel processing. ADEM... portion of the Alabama SIP to the contingency measures portions of the maintenance plans for the... proposed maintenance plans for the 1997 annual fine particulate matter (PM 2.5 ) standards, and the 2006 24...

  18. 76 FR 71455 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ...EPA is taking final action to approve a request submitted on December 18, 2009, and supplemented on December 22, 2010, from the State of North Carolina, through the North Carolina Department of Environment and Natural Resources (NC DENR), Division of Air Quality (DAQ), to redesignate the Greensboro-Winston-Salem-High Point fine particulate matter (PM2.5) nonattainment area (hereafter the ``Greensboro Area'' or ``Area'') to attainment for the 1997 Annual PM2.5 National Ambient Air Quality Standards (NAAQS). The Greensboro Area is comprised of Davidson and Guilford Counties in their entireties. EPA's approval of the redesignation request is based on the determination that the State of North Carolina has met the criteria for redesignation to attainment set forth in the Clean Air Act (CAA or Act), including the determination that the Greensboro Area has attained the 1997 Annual PM2.5 NAAQS by its applicable attainment date of April 5, 2010. Additionally, EPA is approving a revision to the North Carolina State Implementation Plan (SIP) to include the 1997 Annual PM2.5 maintenance plan for the Greensboro Area that contains the new 2011 and 2021 motor vehicle emission budgets (MVEBs) for nitrogen oxides (NOX) and PM2.5 for both Davidson and Guilford Counties. This action also approves the emissions inventory submitted with the maintenance plan. Further, EPA is correcting a typographical error for the citation associated with a previous adequacy finding the Agency made for the NOX and PM2.5 MVEBs for both Davidson and Guilford Counties.

  19. 20 CFR 411.230 - What is a PM?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... One or More Program Managers To Assist in Administration of the Ticket to Work Program § 411.230 What is a PM? A program manager (PM) is an organization in the private or public sector that has entered...

  20. U.S. ENVIRONMENTAL PROTECTION AGENCY'S PM SUPERSITES PROGRAM - A MAJOR SUCCESSFUL COLLABORATIVE AIR QUALITY PROGRAM SUPPORTING STATES AND REGIONAL ORGANIZATIONS IN THEIR APPROACHES TO REDUCE PM LEVELS IN AIR ON URBAN AND REGIONAL SCALES

    EPA Science Inventory

    The U.S. Environmental Protection Agency's Particulate Matter (PM) Supersites Program (Program) is a nationwide air quality methods, measurement, modeling, and data analysis program initiated through cooperative agreements with leading universities in the United States. The Progr...

  1. 33 CFR 117.821 - Atlantic Intracoastal Waterway, Albermarle Sound to Sunset Beach.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., (Newport River) at Morehead City, shall operate as follows: (1) During the day from 5 a.m. to 8:30 p.m... delay the required opening up to 10 minutes past the hour or half hour. (c) From 5 a.m. on October 17... and to perform periodic maintenance. (2) At night, need not open 8:30 p.m. to 5 a.m. except an opening...

  2. A 2,4-dichlorophenoxyacetic acid degradation plasmid pM7012 discloses distribution of an unclassified megaplasmid group across bacterial species.

    PubMed

    Sakai, Yoriko; Ogawa, Naoto; Shimomura, Yumi; Fujii, Takeshi

    2014-03-01

    Analysis of the complete nucleotide sequence of plasmid pM7012 from 2,4-dichlorophenoxyacetic-acid (2,4-D)-degrading bacterium Burkholderia sp. M701 revealed that the plasmid had 582 142 bp, with 541 putative protein-coding sequences and 39 putative tRNA genes for the transport of the standard 20 aa. pM7012 contains sequences homologous to the regions involved in conjugal transfer and plasmid maintenance found in plasmids byi_2p from Burkholderia sp. YI23 and pBVIE01 from Burkholderia sp. G4. No relaxase gene was found in any of these plasmids, although genes for a type IV secretion system and type IV coupling proteins were identified. Plasmids with no relaxase gene have been classified as non-mobile plasmids. However, nucleotide sequences with a high level of similarity to the genes for plasmid transfer, plasmid maintenance, 2,4-D degradation and arsenic resistance contained on pM7012 were also detected in eight other megaplasmids (~600 or 900 kb) found in seven Burkholderia strains and a strain of Cupriavidus, which were isolated as 2,4-D-degrading bacteria in Japan and the United States. These results suggested that the 2,4-D degradation megaplasmids related to pM7012 are mobile and distributed across various bacterial species worldwide, and that the plasmid group could be distinguished from known mobile plasmid groups.

  3. LINKAGES ACROSS PM POLICY AND RESEARCH: EXAMINING THE POLICY RELEVANT FINDINGS FROM THE PM2.5 SUPERSITES PROGRAM

    EPA Science Inventory

    The PM2.5 Supersites program was designed to complement routinely operating PM2.5 networks by providing enhanced temporal and chemical/physical composition data in addressing three overarching objectives: supporting health effects and exposure research, advanced monitoring meth...

  4. 76 FR 71452 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ...EPA is taking final action to approve a request submitted on December 18, 2009, and supplemented on December 22, 2010, from the State of North Carolina, through the North Carolina Department of Environment and Natural Resources (NC DENR), Division of Air Quality (DAQ), to redesignate the Hickory-Morganton-Lenoir fine particulate matter (PM2.5) nonattainment area (hereafter the ``Hickory Area'' or ``Area'') to attainment for the 1997 Annual PM2.5 National Ambient Air Quality Standards (NAAQS). The Hickory Area is comprised of Catawba County in its entirety. EPA's approval of the redesignation request is based on the determination that the State of North Carolina has met the criteria for redesignation to attainment set forth in the Clean Air Act (CAA or Act), including the determination that the Hickory Area has attained the 1997 Annual PM2.5 NAAQS by its applicable attainment date of April 5, 2010. Additionally, EPA is approving a revision to the North Carolina State Implementation Plan (SIP) to include the 1997 Annual PM2.5 maintenance plan for the Hickory Area that contains the new motor vehicle emission budgets (MVEBs) for nitrogen oxides (NOX) for the years 2011 and 2021 for Catawba County and the mobile insignificance determination for direct PM2.5 for the Hickory Area. This action also approves the emissions inventory submitted with the maintenance plan. Further, EPA is correcting a typographical error for the citation associated with a previous adequacy determination the Agency made for the NOX MVEBs for Catawba County and the mobile source insignificance determination for direct PM2.5 for the Hickory Area.

  5. 76 FR 28646 - Implementation of the New Source Review (NSR) Program for Particulate Matter Less Than 2.5...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... Program B. Fine PM and the NAAQS for PM 2.5 C. How is the PSD program for PM 2.5 implemented? IV... ? B. Why did EPA propose to repeal the grandfather provision for PM 2.5 ? C. Summary of Comments and... maintain the NAAQS and to meet the other requirements of section 110(a) of the Act. Part C of title I of...

  6. How Prospective Physical Medicine and Rehabilitation Trainees Rank Residency Training Programs.

    PubMed

    Auriemma, Michael J; Whitehair, Curtis L

    2018-03-01

    Since the inception of the National Resident Matching Program, multiple studies have investigated the factors applicants consider important to ranking prospective residency programs. However, only 2 previous studies focused on prospective physical medicine and rehabilitation (PM&R) trainees, and the most recent of these studies was published in 1993. It is unknown whether these previous studies are reflective of current prospective PM&R residents. To assess various factors that contribute to prospective PM&R residents' decision making in choosing a residency program and compare these findings with previous studies. An anonymous, voluntary questionnaire. A single PM&R residency program. All applicants to a single PM&R residency program. All applicants to our PM&R residency program were invited to participate in a 44-item, 5-point Likert-based questionnaire. Applicants were asked to rate the importance of various factors as they related to constructing their residency rank list. Means and standard deviations were calculated for items included in the survey. A response rate of 26% was obtained, with the responses of 98 applicants (20%) ultimately analyzed. The highest rated factors included "perceived happiness of current residents," "opportunities for hands-on procedure training," "perceived camaraderie among current residents," "perceived camaraderie among faculty and current residents," "perceived quality of current residents," and "perceived work/life balance among current residents." Although male and female respondents demonstrated similar ranking preferences, an apparent difference was detected between how genders rated the importance of "whether the program projects a favorable environment for women" and "whether the program projects a favorable environment for minorities." As compared with previous PM&R applicants, current prospective trainees seem to place greater importance on skill acquisition over didactic teaching. Prospective PM&R residents highly value subjective perceptions of prospective PM&R training programs and the ability to obtain hands-on procedural experience. Not applicable. Copyright © 2018 American Academy of Physical Medicine and Rehabilitation. Published by Elsevier Inc. All rights reserved.

  7. PM2006: a highly scalable urban planning management information system--Case study: Suzhou Urban Planning Bureau

    NASA Astrophysics Data System (ADS)

    Jing, Changfeng; Liang, Song; Ruan, Yong; Huang, Jie

    2008-10-01

    During the urbanization process, when facing complex requirements of city development, ever-growing urban data, rapid development of planning business and increasing planning complexity, a scalable, extensible urban planning management information system is needed urgently. PM2006 is such a system that can deal with these problems. In response to the status and problems in urban planning, the scalability and extensibility of PM2006 are introduced which can be seen as business-oriented workflow extensibility, scalability of DLL-based architecture, flexibility on platforms of GIS and database, scalability of data updating and maintenance and so on. It is verified that PM2006 system has good extensibility and scalability which can meet the requirements of all levels of administrative divisions and can adapt to ever-growing changes in urban planning business. At the end of this paper, the application of PM2006 in Urban Planning Bureau of Suzhou city is described.

  8. Performance measurement integrated information framework in e-Manufacturing

    NASA Astrophysics Data System (ADS)

    Teran, Hilaida; Hernandez, Juan Carlos; Vizán, Antonio; Ríos, José

    2014-11-01

    The implementation of Internet technologies has led to e-Manufacturing technologies becoming more widely used and to the development of tools for compiling, transforming and synchronising manufacturing data through the Web. In this context, a potential area for development is the extension of virtual manufacturing to performance measurement (PM) processes, a critical area for decision making and implementing improvement actions in manufacturing. This paper proposes a PM information framework to integrate decision support systems in e-Manufacturing. Specifically, the proposed framework offers a homogeneous PM information exchange model that can be applied through decision support in e-Manufacturing environment. Its application improves the necessary interoperability in decision-making data processing tasks. It comprises three sub-systems: a data model, a PM information platform and PM-Web services architecture. A practical example of data exchange for measurement processes in the area of equipment maintenance is shown to demonstrate the utility of the model.

  9. 78 FR 72880 - Adequacy Status of the West Virginia Portion of the Steubenville-Weirton, WV-OH Nonattainment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ...In this notice, EPA is notifying the public that we have made insignificance findings through the transportation conformity adequacy process, under the Clean Air Act (CAA), for directly emitted fine particulate matter (PM2.5) and nitrogen oxides (NOX) in the West Virginia portion of the Steubenville- Weirton, WV-OH 1997 PM2.5 national ambient air quality standard (NAAQS) nonattainment area. West Virginia submitted the insignificance findings with the redesignation request and maintenance plan submittal on April 13, 2012. As a result of EPA's findings, the West Virginia portion of the Steubenville-Weirton, WV-OH nonattainment area is no longer required to perform a regional emissions analysis for directly emitted PM2.5, or NOx, as part of future PM2.5 conformity determinations for the 1997 annual PM2.5 air quality standard.

  10. 78 FR 72881 - Adequacy Status of the West Virginia Portion of the Steubenville-Weirton, WV-OH Nonattainment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ...In this notice, EPA is notifying the public that we have made insignificance findings through the transportation conformity adequacy process, under the Clean Air Act (CAA), for directly emitted fine particulate matter (PM2.5) and nitrogen oxides (NOX) in the West Virginia portion of the Steubenville- Weirton, WV-OH 2006 PM2.5 national ambient air quality standard (NAAQS) nonattainment area. West Virginia submitted the insignificance findings with the redesignation request and maintenance plan submittal on June 8, 2012. As a result of EPA's findings, the West Virginia portion of the Steubenville-Weirton, WV-OH nonattainment area is no longer required to perform a regional emissions analysis for directly emitted PM2.5, or NOX, as part of future PM2.5 conformity determinations for the 2006 daily PM2.5 air quality standard.

  11. Region 8: Colorado Adequate Letter (10/29/2001)

    EPA Pesticide Factsheets

    This letter from EPA to Colorado Department of Public Health and Environment determined Denvers' particulate matter (PM10) maintenance plan for Motor Vehicle Emissions Budgets adequate for transportation conformity purposes.

  12. 76 FR 60492 - Adequacy Status of the Ohio Portion of the Huntington/Ashland Submitted Annual Fine Particulate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ...In this notice, EPA is notifying the public that we have made insignificance findings through the transportation conformity adequacy process, under the Clean Air Act, for directly emitted fine particulate matter (PM2.5) and oxides of nitrogen (NOX) in the Ohio portion of the Huntington/Ashland WV-KY-OH area. Ohio submitted the insignificance findings with the redesignation and maintenance plan submittal on May 4, 2011. As a result of our findings, the Ohio portion of the Huntington/Ashland area is no longer required to perform a regional emissions analysis for either directly emitted PM2.5 or NOX as part of future PM2.5 conformity determinations for the 1997 annual PM2.5 air quality standard.

  13. Impaired contextual fear extinction and hippocampal synaptic plasticity in adult rats induced by prenatal morphine exposure.

    PubMed

    Tan, Ji-Wei; Duan, Ting-Ting; Zhou, Qi-Xin; Ding, Ze-Yang; Jing, Liang; Cao, Jun; Wang, Li-Ping; Mao, Rong-Rong; Xu, Lin

    2015-07-01

    Prenatal opiate exposure causes a series of neurobehavioral disturbances by affecting brain development. However, the question of whether prenatal opiate exposure increases vulnerability to memory-related neuropsychiatric disorders in adult offspring remains largely unknown. Here, we found that rats prenatally exposed to morphine (PM) showed impaired acquisition but enhanced maintenance of contextual fear memory compared with control animals that were prenatally exposed to saline (PS). The impairment of acquisition was rescued by increasing the intensity of footshocks (1.2 mA rather than 0.8 mA). Meanwhile, we also found that PM rats exhibited impaired extinction of contextual fear, which is associated with enhanced maintenance of fear memory. The impaired extinction lasted for 1 week following extinction training. Furthermore, PM rats exhibited reduced anxiety-like behavior in the elevated plus-maze and light/dark box test without differences in locomotor activity. These alterations in PM rats were mirrored by abnormalities in synaptic plasticity in the Schaffer collateral-CA1 synapses of the hippocampus in vivo. PS rats showed blocked long-term potentiation and enabled long-term depression in CA1 synapses following contextual fear conditioning, while prenatal morphine exposure restricted synaptic plasticity in CA1 synapses. The smaller long-term potentiation in PM rats was not further blocked by contextual fear conditioning, and the long-term depression enabled by contextual fear conditioning was abolished. Taken together, our results provide the first evidence suggesting that prenatal morphine exposure may increase vulnerability to fear memory-related neuropsychiatric disorders in adulthood. © 2014 Society for the Study of Addiction.

  14. 76 FR 52992 - Sunshine Act; Notice of Agency Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ... Diagonal Road Entrance), Alexandria, VA 22314-3428. STATUS: Open. MATTERS TO BE CONSIDERED: 1. Proposed... Maintenance. 3. Temporary Corporate Credit Union Stabilization Fund Assessment. RECESS: 1:45 p.m. TIME AND...

  15. 78 FR 54396 - Approval and Promulgation of Air Quality Implementation Plans; State of New Jersey; Redesignation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ...On December 26, 2012 the New Jersey Department of Environmental Protection (NJDEP) submitted a request for the Environmental Protection Agency (EPA) to approve the redesignation of the New Jersey portion of the New York-N.New Jersey-Long Island, NY-NJ- CT nonattainment area, and the New Jersey portion of the Philadelphia- Wilmington, PA-NJ-DE nonattainment area, from nonattainment to attainment for the 1997 annual and the 2006 24-hour Fine Particle (PM2.5) National Ambient Air Quality Standards (NAAQS). In conjunction with its redesignation request, New Jersey submitted a State Implementation Plan (SIP) revision containing a maintenance plan for the areas that provides for continued maintenance of the 1997 annual and 2006 24-hour PM2.5 NAAQS. The submittals included the 2007 ammonia (NH3), volatile organic compounds (VOC), nitrogen oxides (NOX), direct PM2.5 and sulfur dioxide (SO2) emissions inventories submitted to meet the comprehensive emissions inventory requirements of section 172(c)(3) of the Clean Air Act (CAA), and accompanying motor vehicle emissions budgets. EPA is taking final action to approve the requested SIP revisions and to redesignate the New Jersey portions of the New York- N.New Jersey-Long Island, NY-NJ-CT nonattainment area, and the Philadelphia-Wilmington, PA-NJ-DE nonattainment area, to attainment for the 1997 annual and the 2006 24-hour PM2.5 NAAQS.

  16. OVERVIEW AND STATUS OF THE PM SUPERSITES PROGRAM

    EPA Science Inventory

    The PM Supersites program was first conceived as a set of special studies extending beyond the national regulatory networks for particulate matter (PM) to elucidate source-receptor relationships and atmospheric processes in support of State implementation plans (SIP's). The pr...

  17. Related Rules and Programs that Help States Attain PM Standards

    EPA Pesticide Factsheets

    EPA’s national and regional rules to reduce emissions of pollutants that form particle pollution will help state and local governments meet the PM NAAQS. A number of voluntary programs also are helping areas reduce fine PM pollution.

  18. ECS Maintenance Wed. 12/28

    Atmospheric Science Data Center

    2016-12-27

    Date(s):  Wednesday, December 28, 2016 Time:  12 am - 12 pm EDT Event Impact:  The Data Pool, MISR order and browse tools, TAD, TES and MOPITT Search and Subset Applications, and Reverb will be unavailable...

  19. TXDOT guidelines to assign PMIS treatment levels.

    DOT National Transportation Integrated Search

    2014-06-01

    This report has been developed to provide TxDOT with guidelines to assign PMIS treatment levels for : asphalt and rigid pavements which include Preventive Maintenance (PM), Light Rehabilitation (LRhb), : Medium Rehabilitation (MRhb), and Heavy Rehabi...

  20. 48 CFR 301.607-70 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... General. In accordance with the Federal Acquisition Certification—Program and Project Managers (FAC-P/PM) program, HHS has established a certification program for Program or Project Managers. See HHS' Federal Acquisition Certification—Program and Project Managers Handbook (P/PM Handbook) for information on the methods...

  1. A discordance between cytochrome P450 2D6 genotype and phenotype in patients undergoing methadone maintenance treatment

    PubMed Central

    Shiran, M R; Chowdry, J; Rostami-Hodjegan, A; Ellis, S W; Lennard, M S; Iqbal, M Z; Lagundoye, O; Seivewright, N; Tucker, G T

    2003-01-01

    Aims To assess CYP2D6 activity and genotype in a group of patients undergoing methadone maintenance treatment (MMT). Methods Blood samples from 34 MMT patients were genotyped by a polymerase chain reaction-based method, and results were compared with CYP2D6 phenotype (n = 28), as measured by the molar metabolic ratio (MR) of dextromethorphan (DEX)/dextrorphan (DOR) in plasma. Results Whereas 9% of patients (3/34) were poor metabolizers (PM) by genotype, 57% (16/28) were PM by phenotype (P < 0.005). Eight patients, who were genotypically extensive metabolizers (EM), were assigned as PM by their phenotype. The number of CYP2D6*4 alleles and sex were significant determinants of CYP2D6 activity in MMT patients, whereas other covariates (methadone dose, age, weight) did not contribute to variation in CYP2D6 activity. Conclusions There was a discordance between genotype and in vivo CYP2D6 activity in MMT patients. This finding is consistent with inhibition of CYP2D6 activity by methadone and may have implications for the safety and efficacy of other CYP2D6 substrates taken by MMT patients. PMID:12895196

  2. Exposure of highway maintenance workers to fine particulate matter and noise.

    PubMed

    Meier, Reto; Cascio, Wayne E; Danuser, Brigitta; Riediker, Michael

    2013-10-01

    In this study, we assessed the mixed exposure of highway maintenance workers to airborne particles, noise, and gaseous co-pollutants. The aim was to provide a better understanding of the workers' exposure to facilitate the evaluation of short-term effects on cardiovascular health endpoints. To quantify the workers' exposure, we monitored 18 subjects during 50 non-consecutive work shifts. Exposure assessment was based on personal and work site measurements and included fine particulate matter (PM2.5), particle number concentration (PNC), noise (Leq), and the gaseous co-pollutants: carbon monoxide, nitrogen dioxide, and ozone. Mean work shift PM2.5 concentrations (gravimetric measurements) ranged from 20.3 to 321 μg m(-3) (mean 62 μg m(-3)) and PNC were between 1.6×10(4) and 4.1×10(5) particles cm(-3) (8.9×10(4) particles cm(-3)). Noise levels were generally high with Leq over work shifts from 73.3 to 96.0 dB(A); the averaged Leq over all work shifts was 87.2 dB(A). The highest exposure to fine and ultrafine particles was measured during grass mowing and lumbering when motorized brush cutters and chain saws were used. Highest noise levels, caused by pneumatic hammers, were measured during paving and guardrail repair. We found moderate Spearman correlations between PNC and PM2.5 (r = 0.56); PNC, PM2.5, and CO (r = 0.60 and r = 0.50) as well as PNC and noise (r = 0.50). Variability and correlation of parameters were influenced by work activities that included equipment causing combined air pollutant and noise emissions (e.g. brush cutters and chain saws). We conclude that highway maintenance workers are frequently exposed to elevated airborne particle and noise levels compared with the average population. This elevated exposure is a consequence of the permanent proximity to highway traffic with additional peak exposures caused by emissions of the work-related equipment.

  3. Region 8: Colorado Lamar and Steamboat Springs Adequate Letter (11/12/2002)

    EPA Pesticide Factsheets

    This letter from EPA to Colorado Department of Public Health and Environment determined Lamar and Steamboat Springs particulate matter (PM10) maintenance plan for Motor Vehicle Emissions Budgets adequate for transportation conformity purposes

  4. Differential effects of emotional cues on components of prospective memory: an ERP study

    PubMed Central

    Cona, Giorgia; Kliegel, Matthias; Bisiacchi, Patrizia S.

    2015-01-01

    So far, little is known about the neurocognitive mechanisms associated with emotion effects on prospective memory (PM) performance. Thus, this study aimed at disentangling possible mechanisms for the effects of emotional valence of PM cues on the distinct phases composing PM by investigating event-related potentials (ERPs). Participants were engaged in an ongoing N-back task while being required to perform a PM task. The emotional valence of both the ongoing pictures and the PM cues was manipulated (pleasant, neutral, unpleasant). ERPs were recorded during the PM phases, such as encoding, maintenance, and retrieval of the intention. A recognition task including PM cues and ongoing stimuli was also performed at the end of the sessions. ERP results suggest that emotional PM cues not only trigger an automatic, bottom-up, capture of attention, but also boost a greater allocation of top-down processes. These processes seem to be recruited to hold attention toward the emotional stimuli and to retrieve the intention from memory, likely because of the motivational significance of the emotional stimuli. Moreover, pleasant PM cues seemed to modulate especially the prospective component, as revealed by changes in the amplitude of the ERP correlates of strategic monitoring as a function of the relevance of the valence for the PM task. Unpleasant pictures seemed to modulate especially the retrospective component, as revealed by the largest old/new effect being elicited by unpleasant PM pictures in the recognition task. PMID:25674061

  5. 14 CFR 91.1425 - CAMP: Maintenance, preventive maintenance, and alteration programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... RULES Fractional Ownership Operations Program Management § 91.1425 CAMP: Maintenance, preventive maintenance, and alteration programs. Each program manager who maintains program aircraft under a CAMP must... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false CAMP: Maintenance, preventive maintenance...

  6. Deriving fuel-based emission factor thresholds to interpret heavy-duty vehicle roadside plume measurements.

    PubMed

    Quiros, David C; Smith, Jeremy D; Ham, Walter A; Robertson, William H; Huai, Tao; Ayala, Alberto; Hu, Shaohua

    2018-04-13

    Remote sensing devices have been used for decades to measure gaseous emissions from individual vehicles at the roadside. Systems have also been developed that entrain diluted exhaust and can also measure particulate matter (PM) emissions. In 2015, the California Air Resources Board (CARB) reported that 8% of in-field diesel particulate filters (DPF) on heavy-duty (HD) vehicles were malfunctioning and emitted about 70% of total diesel PM emissions from the DPF-equipped fleet. A new high-emitter problem in the heavy-duty vehicle fleet had emerged. Roadside exhaust plume measurements reflect a snapshot of real-world operation, typically lasting several seconds. In order to relate roadside plume measurements to laboratory emission tests, we analyzed carbon dioxide (CO 2 ), oxides of nitrogen (NO X ), and PM emissions collected from four HD vehicles during several driving cycles on a chassis dynamometer. We examined the fuel-based emission factors corresponding to possible exceedances of emission standards as a function of vehicle power. Our analysis suggests that a typical HD vehicle will exceed the model year (MY) 2010 emission standards (of 0.2 g NO X /bhp-hr and 0.01 g PM/bhp-hr) by three times when fuel-based emission factors are 9.3 g NO X /kg fuel and 0.11 g PM/kg using the roadside plume measurement approach. Reported limits correspond to 99% confidence levels, which were calculated using the detection uncertainty of emissions analyzers, accuracy of vehicle power calculations, and actual emissions variability of fixed operational parameters. The PM threshold was determined for acceleration events between 0.47 and 1.4 mph/sec only, and the NO X threshold was derived from measurements where aftertreatment temperature was above 200°C. Anticipating a growing interest in real-world driving emissions, widespread implementation of roadside exhaust plume measurements as a compliment to in-use vehicle programs may benefit from expanding this analysis to a larger sample of in-use HD vehicles. Implications Regulatory agencies, civil society, and the public at large have a growing interest in vehicle emission compliance in the real world. Leveraging roadside plume measurements to identify vehicles with malfunctioning emission control systems is emerging as a viable new and useful method to assess in-use performance. This work proposes fuel-based emission factor thresholds for PM and NOx that signify exceedances of emission standards on a work-specific basis by analyzing real-time emissions in the laboratory. These thresholds could be used to pre-screen vehicles before roadside enforcement inspection or other inquiry, enhance and further develop emission inventories, and potentially develop new requirements for heavy-duty inspection and maintenance (I/M) programs, including but not limited to identifying vehicles for further testing.

  7. Using Phun to Study ``Perpetual Motion'' Machines

    NASA Astrophysics Data System (ADS)

    Koreš, Jaroslav

    2012-05-01

    The concept of "perpetual motion" has a long history. The Indian astronomer and mathematician Bhaskara II (12th century) was the first person to describe a perpetual motion (PM) machine. An example of a 13th- century PM machine is shown in Fig. 1. Although the law of conservation of energy clearly implies the impossibility of PM construction, over the centuries numerous proposals for PM have been made, involving ever more elements of modern science in their construction. It is possible to test a variety of PM machines in the classroom using a program called Phun2 or its commercial version Algodoo.3 The programs are designed to simulate physical processes and we can easily simulate mechanical machines using them. They provide an intuitive graphical environment controlled with a mouse; a programming language is not needed. This paper describes simulations of four different (supposed) PM machines.4

  8. Air Quality in Mexico City: Policies Implemented for its Improvement

    NASA Astrophysics Data System (ADS)

    Paramo, V.

    2007-12-01

    Ozone and suspended particles (PM) are two pollutants in the atmosphere of Mexico City Metropolitan Area (MCMA) that still exceed the recommended Mexican health standards. The other criteria pollutants very seldom exceed their corresponding standards. In 2006, the maximum ozone concentrations were above the health standard (0.11 ppm in 1 hour) during 59 percent of the days for an average of 2.2 hours and 130 points of the Air Quality Index (Índice Metropolitano de la Calidad del Aire - IMECA). In contrast, in 1991, 98 percent of the days exceeded the ozone health standard for an average of 6.6 hours and 200 IMECA points. With regards to PM10, in 2006, 80 percent of the sampled concentrations were below the health standard of 120 µg/m3 in 24 hours. However, the annual health standard of 50 µg/m3 is still exceeded. The air quality management in the MCMA is a difficult task due to several adverse factors. The main one is the large population that increased from nearly 15 million in 1992 to more than 18 million at present. As a result, the urban area grows in the adjoined municipalities of the State of Mexico. The vehicular fleet increases also to almost 4 million and the number of industrial facilities is at present 50,000. Consequently, the fuel consumption is very high. The daily energy consumption is estimated to be 44 million liters of equivalent of gasoline. Despite the fact that the air quality has improved in recent years, the related health standards are still exceeded and therefore it is necessary to continue applying the most cost-effective actions to improve the environment quality. Some actions that have contributed most to the reduction of pollutant emissions are the following: Continuous update of the inspection and maintenance program of the vehicular fleet; substitution of the catalytic converters at the end of their useful life; self-regulation of the diesel fleet; use of alternative fuels; update the No-Driving-Day program; establishment of more stringent emission levels of the gasoline fleet; update the detention of pollutant vehicles program; partial exemption of the inspection and maintenance program for cleaner and or highly efficient vehicles; substitution of 3,000 microbuses, 40,000 taxis and 1,200 buses; commissioning of the first Bus Rapid Transit system; implementation of a program for the emissions reduction for the 300 most polluted industrial facilities; and continuous update of the air quality environmental management programs. To continue improving the air quality in the MCMA, the environmental authorities will continue the implementation of the 2002-2010 Air Quality Improvement Program. In 2007 the Green Program was started, this includes those actions that have proven to be effective reduction of pollutant emissions and incorporates new actions for the reduction of local and global pollutant emissions. The most important of these new actions are: substitution of 9,500 microbuses; renewal of all the taxis fleet; commissioning of 10 Bus Rapid Transit lines; commissioning of Line 12 of the underground system; schedules and routes limitations to the cargo fleet; increase 5 percent the number of non-motorized trips (bicycling and walking); regulation of the private public transport passenger stops; requirement of private schools to provide school transport; regulation of non-occupied taxis in circulation; modifications to the circulation of 350 critical crossing points in the city; adoption of intelligent traffic lights systems; complete substitution of the local government vehicle's fleet; implement the inspection and maintenance of the cargo fleet; introduction of low- sulfur diesel, among other measures.

  9. The Efficacy Profile of Rotigotine During the Waking Hours in Patients With Advanced Parkinson's Disease: A Post Hoc Analysis

    PubMed Central

    LeWitt, Peter A.; Poewe, Werner; Elmer, Lawrence W.; Asgharnejad, Mahnaz; Boroojerdi, Babak; Grieger, Frank; Bauer, Lars

    2016-01-01

    Objectives Transdermal delivery of rotigotine maintains stable plasma concentrations for 24 hours. Three phase 3 studies of rotigotine as add-on to levodopa in advanced Parkinson's disease showed a significant reduction in “off” time from baseline to end of maintenance (EoM). However, detailed analyses over the range of a day have not yet been performed. The objective was to examine the time course of the efficacy profile of rotigotine throughout the day. Methods Post hoc analysis of diary data from 3 double-blind, placebo-controlled studies of rotigotine in patients with advanced Parkinson's disease inadequately controlled with levodopa, with average “off” time of ≥2.5 h/d (CLEOPATRA-PD [NCT00244387], 16-week maintenance; PREFER, 24-week maintenance; SP921 [NCT00522379], 12-week maintenance). Patients marked 30-minute intervals as “off,” “on without troublesome dyskinesia,” “on with troublesome dyskinesia,” or “sleep.” Diaries completed on the 3 days before EoM were analyzed. A 2-sample t test was performed for comparison of rotigotine + levodopa versus placebo + levodopa for mean percentage of time per status during four 6-hour periods: 12:00am (midnight) to 6:00am, 6:00am to 12:00pm (noon), noon to 6:00pm, and 6:00pm to midnight. Results Data were available for 967 patients (placebo + levodopa, 260; rotigotine + levodopa, 707). During the 24-hour period at EoM, an advantage in mean percentage time spent “off” and “on without troublesome dyskinesia” was observed with rotigotine + levodopa versus placebo + levodopa during the three 6-hour periods from 6:00am to midnight (P < 0.05; exploratory analysis). Conclusions These exploratory analyses of patients with motor fluctuations suggest that the efficacy of rotigotine transdermal patch, as captured by diary data, in reducing “off” time and increasing “on time without troublesome dyskinesia” may cover the full waking day. PMID:26882318

  10. The Efficacy Profile of Rotigotine During the Waking Hours in Patients With Advanced Parkinson's Disease: A Post Hoc Analysis.

    PubMed

    LeWitt, Peter A; Poewe, Werner; Elmer, Lawrence W; Asgharnejad, Mahnaz; Boroojerdi, Babak; Grieger, Frank; Bauer, Lars

    2016-01-01

    Transdermal delivery of rotigotine maintains stable plasma concentrations for 24 hours. Three phase 3 studies of rotigotine as add-on to levodopa in advanced Parkinson's disease showed a significant reduction in "off" time from baseline to end of maintenance (EoM). However, detailed analyses over the range of a day have not yet been performed. The objective was to examine the time course of the efficacy profile of rotigotine throughout the day. Post hoc analysis of diary data from 3 double-blind, placebo-controlled studies of rotigotine in patients with advanced Parkinson's disease inadequately controlled with levodopa, with average "off" time of ≥2.5 h/d (CLEOPATRA-PD [NCT00244387], 16-week maintenance; PREFER, 24-week maintenance; SP921 [NCT00522379], 12-week maintenance). Patients marked 30-minute intervals as "off," "on without troublesome dyskinesia," "on with troublesome dyskinesia," or "sleep." Diaries completed on the 3 days before EoM were analyzed. A 2-sample t test was performed for comparison of rotigotine + levodopa versus placebo + levodopa for mean percentage of time per status during four 6-hour periods: 12:00AM (midnight) to 6:00AM, 6:00AM to 12:00PM (noon), noon to 6:00PM, and 6:00PM to midnight. Data were available for 967 patients (placebo + levodopa, 260; rotigotine + levodopa, 707). During the 24-hour period at EoM, an advantage in mean percentage time spent "off" and "on without troublesome dyskinesia" was observed with rotigotine + levodopa versus placebo + levodopa during the three 6-hour periods from 6:00AM to midnight (P < 0.05; exploratory analysis). These exploratory analyses of patients with motor fluctuations suggest that the efficacy of rotigotine transdermal patch, as captured by diary data, in reducing "off" time and increasing "on time without troublesome dyskinesia" may cover the full waking day.

  11. The state of the service: a survey of psychiatry resident education in psychosomatic medicine.

    PubMed

    Heinrich, Thomas W; Schwartz, Ann C; Zimbrean, Paula C; Wright, Mark T

    2013-01-01

    Although required by the Accreditation Council for Graduate Medical Education, training of general psychiatry residents in Psychosomatic Medicine (PM) varies significantly between programs. In 1996, the Academy of Psychosomatic Medicine (APM) developed guidelines for residency training in PM. Since then, there has been no assessment of the status of PM training during psychiatry residency. Assessment of the current state of PM training in U.S. psychiatry residency programs. A 46-item questionnaire was sent via e-mail to 206 residency directors. Four major areas were assessed: the timing and duration of the PM rotation, level of faculty supervision, didactic curriculum, and role (or potential role) of the APM in residency education. Ninety-two surveys were returned (response rate 45%). Forty-four (54%) of the general psychiatry residencies reported the total duration of the C-L rotation as being between 3 and 6 months (including both full- and part-time rotation). Only 38 (46%) programs' residents complete their PM experience in 1 year of residency. The average Full-Time Equivalent of teaching faculty per service was 1.74 (standard deviation 0.92). Sixty-four (77%) programs have a formal didactic curriculum in C-L. Eighty-one (98%) respondents were aware of the APM. Fifty-eight (70%) had APM members among faculty. The most popular responses on how the APM could best serve training programs were the creation of a subspecialty curriculum (73%) as well as the development of a competency-based evaluation tool (66%). There is significant variation in how residents are taught PM during their training. The APM is a well-recognized organization that may define what constitutes adequate residency training in PM and may help programs fulfill the educational needs of residents. © 2013 The Academy of Psychosomatic Medicine. Published by Elsevier Inc. All rights reserved.

  12. 20 CFR 411.250 - How will SSA evaluate a PM?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work Program... determine the PM's final rating. (c) These performance evaluations will be made part of our database on...

  13. 25 CFR 170.804 - How is BIA's Road Maintenance Program related to the IRR Program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How is BIA's Road Maintenance Program related to the IRR... WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.804 How is BIA's Road Maintenance Program related to the IRR Program? The following chart illustrates how BIA's Road Maintenance Program is...

  14. "It doesn't seem to make sense for a company that sells cigarettes to help smokers stop using them": A case study of Philip Morris's involvement in smoking cessation.

    PubMed

    McDaniel, Patricia A; Lown, E Anne; Malone, Ruth E

    2017-01-01

    In the late 1990s, American tobacco companies began offering limited cessation assistance to smokers by posting links on their company websites to government-sponsored smoking cessation resources. Philip Morris USA (PM) went further, funding youth cessation programs and creating its own online cessation program, QuitAssist. We explore why PM entered the cessation arena, and describe the variety of options considered and how PM-supported cessation programs were evaluated and promoted. We retrieved and analyzed archival PM documents from 1998-2005. We supplemented information from the documents with scholarly articles assessing QuitAssist and archived versions of the PM and QuitAssist websites. PM's Youth Smoking Prevention department began funding youth cessation projects and programs soon after its creation in 1998, motivated by the same issue that drove its interest in youth smoking prevention: regulatory threats posed by public and policymaker concern about youth smoking. The department took a similar approach to youth smoking cessation as it did with prevention, rejecting curricula with "anti-industry" themes. In 2002, a "cessation exploration team" examined a variety of rationales for and approaches to company support for adult smoking cessation. Ultimately, PM chose QuitAssist, a limited and less expensive option that nonetheless provided opportunities for engagement with a variety of public health and government officials. Independent research indicates that QuitAssist is not an effective cessation tool. While the transformation of ambitious plans into a mundane final product is a recurring theme with PM's corporate responsibility efforts, it would be inappropriate to dismiss PM's smoking cessation endeavors as half-hearted attempts to appear responsible. Such endeavors have the potential to inflict real harm by competing with more effective programs and by helping to maintain a tobacco-favorable policy environment. If PM truly wanted to support cessation, it could drop legal and other challenges to public policies that discourage smoking.

  15. 78 FR 74119 - Department of Defense Task Force on the Care, Management, and Transition of Recovering Wounded...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-10

    ... Project Technical Training Academy Briefing 11:00 a.m.-12:00 p.m. Interagency Program Office (IPO) Briefing 12:00 p.m.-1:00 p.m. Break for Lunch 1:00 p.m.-2:00 p.m. Job Training, Employment Skills Training...

  16. Virtual reality-based prospective memory training program for people with acquired brain injury.

    PubMed

    Yip, Ben C B; Man, David W K

    2013-01-01

    Acquired brain injuries (ABI) may display cognitive impairments and lead to long-term disabilities including prospective memory (PM) failure. Prospective memory serves to remember to execute an intended action in the future. PM problems would be a challenge to an ABI patient's successful community reintegration. While retrospective memory (RM) has been extensively studied, treatment programs for prospective memory are rarely reported. The development of a treatment program for PM, which is considered timely, can be cost-effective and appropriate to the patient's environment. A 12-session virtual reality (VR)-based cognitive rehabilitation program was developed using everyday PM activities as training content. 37 subjects were recruited to participate in a pretest-posttest control experimental study to evaluate its treatment effectiveness. Results suggest that significantly better changes were seen in both VR-based and real-life PM outcome measures, related cognitive attributes such as frontal lobe functions and semantic fluency. VR-based training may be well accepted by ABI patients as encouraging improvement has been shown. Large-scale studies of a virtual reality-based prospective memory (VRPM) training program are indicated.

  17. PM SUPERSITES PROGRAM

    EPA Science Inventory

    In 1997, the EPA administrator published National Ambient Air Quality Standards (NAAQS) for Particulate Matter (PM) that included new standards for PM2.5 (PM with diameters less than 2.5 um). These revised standards stimulated national concern over uncertainties regarding the ex...

  18. SUMMARY OF EPA'S PARTICULATE MATTER SUPERSITES PROGRAM: RESULTS THAT CAN BE USED TO PREPARE AND EVALUATE STATE IMPLEMENTATION PLANS (SIPS)

    EPA Science Inventory

    In 1999, the United States Environmental Protection Agency (EPA) initiated a major air quality program referred to as the Particulate Matter (PM) Supersites Program. The PM Supersites Program is a multi-year, $27 million air quality program consisting of eight (8) regional air q...

  19. Effects of cue focality on the neural mechanisms of prospective memory: A meta-analysis of neuroimaging studies.

    PubMed

    Cona, Giorgia; Bisiacchi, Patrizia Silvia; Sartori, Giuseppe; Scarpazza, Cristina

    2016-05-17

    Remembering to execute pre-defined intentions at the appropriate time in the future is typically referred to as Prospective Memory (PM). Studies of PM showed that distinct cognitive processes underlie the execution of delayed intentions depending on whether the cue associated with such intentions is focal to ongoing activity processing or not (i.e., cue focality). The present activation likelihood estimation (ALE) meta-analysis revealed several differences in brain activity as a function of focality of the PM cue. The retrieval of intention is supported mainly by left anterior prefrontal cortex (Brodmann Area, BA 10) in nonfocal tasks, and by cerebellum and ventral parietal regions in focal tasks. Furthermore, the precuneus showed increased activation during the maintenance phase of intentions compared to the retrieval phase in nonfocal tasks, whereas the inferior parietal lobule showed increased activation during the retrieval of intention compared to maintenance phase in the focal tasks. Finally, the retrieval of intention relies more on the activity in anterior cingulate cortex for nonfocal tasks, and on posterior cingulate cortex for focal tasks. Such focality-related pattern of activations suggests that prospective remembering is mediated mainly by top-down and stimulus-independent processes in nonfocal tasks, whereas by more automatic, bottom-up, processes in focal tasks.

  20. Effects of cue focality on the neural mechanisms of prospective memory: A meta-analysis of neuroimaging studies

    PubMed Central

    Cona, Giorgia; Bisiacchi, Patrizia Silvia; Sartori, Giuseppe; Scarpazza, Cristina

    2016-01-01

    Remembering to execute pre-defined intentions at the appropriate time in the future is typically referred to as Prospective Memory (PM). Studies of PM showed that distinct cognitive processes underlie the execution of delayed intentions depending on whether the cue associated with such intentions is focal to ongoing activity processing or not (i.e., cue focality). The present activation likelihood estimation (ALE) meta-analysis revealed several differences in brain activity as a function of focality of the PM cue. The retrieval of intention is supported mainly by left anterior prefrontal cortex (Brodmann Area, BA 10) in nonfocal tasks, and by cerebellum and ventral parietal regions in focal tasks. Furthermore, the precuneus showed increased activation during the maintenance phase of intentions compared to the retrieval phase in nonfocal tasks, whereas the inferior parietal lobule showed increased activation during the retrieval of intention compared to maintenance phase in the focal tasks. Finally, the retrieval of intention relies more on the activity in anterior cingulate cortex for nonfocal tasks, and on posterior cingulate cortex for focal tasks. Such focality-related pattern of activations suggests that prospective remembering is mediated mainly by top-down and stimulus-independent processes in nonfocal tasks, whereas by more automatic, bottom-up, processes in focal tasks. PMID:27185531

  1. Origin of polycyclic aromatic hydrocarbons and other organic pollutants in the air particles of subway stations in Barcelona.

    PubMed

    van Drooge, Barend L; Prats, Raimon M; Reche, Cristina; Minguillón, MariCruz; Querol, Xavier; Grimalt, Joan O; Moreno, Teresa

    2018-06-09

    Underground subways transport large numbers of citizens in big cities, which must breathe air with limited ventilation. These atmospheric conditions may enhance the concentration of air pollutants from both outdoor and indoor air. The influence of ventilation conditions and maintenance activities on the concentrations of air pollutants have been studied. Particulate matter with aerodynamic diameter smaller than 2.5 μm (PM 2.5 ) in indoor air was sampled in ten platforms of nine subway stations of the metropolitan area of Barcelona in 2015 and 2016. These particles were analyzed for polycyclic aromatic hydrocarbons (PAH) and organic tracer compounds. The concentrations of PAH were in the range of the street air levels with higher PAH values in the colder period. No influence of nighttime maintenance activities was observed on the platform air quality during daytime. Source apportionment analysis using the concentrations of hopanes, nicotine and levoglucosan as molecular tracer compounds showed that 75% of the detected PAH at the platforms have an outdoor PM origin. The modern subway stations, with advanced ventilation and platform screen doors that separate the subway system from the platform, showed lowest PAH and PM concentrations. Copyright © 2018. Published by Elsevier B.V.

  2. 76 FR 27743 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee... Management Committee. DATES: The meeting will be held May 26, 2011 from 12 p.m. to 1 p.m. ADDRESSES: The...

  3. 77 FR 23245 - Pesticide Program Dialogue Committee; Notice of Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ...: Integrated Pest Management, Comparative Safety Statements, Public Health, and Pollinator Protection. The PPDC... p.m.; Comparative Safety Statements from 1 p.m. to 4 p.m.; Public Health from 1 p.m. to 4 p.m.; and... Management and Pollinator Protection Workgroup meetings. The Comparative Safety Statements [[Page 23246...

  4. Region 8: Colorado Adequate Letter (6/11/2012)

    EPA Pesticide Factsheets

    This August 11, 2011 letter from EPA to Chistopher E. Urbina M.D., MPH, Colorado Department of Public Health and Environment states that EPA has found that the Aspen PM10 maintenance plan and the 2023 motor vehicle emissions budget (MVEB) adequate

  5. Maintenance Downtime August 22, 23, 29, 30, 2014

    Atmospheric Science Data Center

    2014-08-28

    ... Friday, August 22, 2014 to Saturday, August 23, 2014 Time:  07:00 pm - 08:00 am EDT Event ... on Friday evening through Saturday morning on Aug. 22-23, and again on Aug. 29-30. Periods of intermittent network outages will occur ...

  6. 77 FR 30227 - Small Business Size Regulations, Small Business Innovation Research (SBIR) Program and Small...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... 19, 2012, in Austin, TX. These Roundtable Meetings will be conducted by SBA's Office of Advocacy. For... p.m. EST. Austin, TX June 19, 2012, 10 a.m.-2 p.m. EST June 14, 2012, 11:59 p.m. EST. III... Business Size Regulations, Small Business Innovation Research (SBIR) Program and Small Business Technology...

  7. Prospective memory function and cue salience in mild cognitive impairment: Findings from the Sydney Memory and Ageing Study.

    PubMed

    Thompson, Claire L; Henry, Julie D; Rendell, Peter G; Withall, Adrienne; Kochan, Nicole A; Sachdev, Perminder; Brodaty, Henry

    2017-12-01

    Prospective memory (PM) is crucial to the maintenance of functional independence in late adulthood and is consistently impaired in mild cognitive impairment (MCI). There remains a need for brief but valid measures of this construct that can be used as part of a comprehensive clinical assessment of cognition. Since the distinctiveness of PM cues is argued to determine the degree of strategic, controlled demands of PM paradigms, two variants of a brief measure were developed, one of which presented low-salience and the other high-salience PM cues. A large cohort of older adults with normal cognition or MCI was assessed with one of the two variants of our brief, novel measure of PM. Participants were asked to remember to execute PM tasks where the target cue was either high or low in salience, while concurrently engaged in an ongoing task of olfactory assessment. The task was able to discriminate between groups of participants with MCI or no cognitive impairment, albeit with a small effect size. The high-salience cue improved performance on the PM task; however, there was no interaction of cue salience with group. These results suggest that the temporal reliability and construct validity of very brief measures of the type used in this study need further exploration to determine their potential to provide meaningful insights into PM function. This measure may have utility as a brief screening tool, with identified deficits being followed up with a more comprehensive PM assessment.

  8. Space shuttle maintenance program planning document

    NASA Technical Reports Server (NTRS)

    Brown, D. V.

    1972-01-01

    A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

  9. Dual pathways to prospective remembering

    PubMed Central

    McDaniel, Mark A.; Umanath, Sharda; Einstein, Gilles O.; Waldum, Emily R.

    2015-01-01

    According to the multiprocess framework (McDaniel and Einstein, 2000), the cognitive system can support prospective memory (PM) retrieval through two general pathways. One pathway depends on top–down attentional control processes that maintain activation of the intention and/or monitor the environment for the triggering or target cues that indicate that the intention should be executed. A second pathway depends on (bottom–up) spontaneous retrieval processes, processes that are often triggered by a PM target cue; critically, spontaneous retrieval is assumed not to require monitoring or active maintenance of the intention. Given demand characteristics associated with experimental settings, however, participants are often inclined to monitor, thereby potentially masking discovery of bottom–up spontaneous retrieval processes. In this article, we discuss parameters of laboratory PM paradigms to discourage monitoring and review recent behavioral evidence from such paradigms that implicate spontaneous retrieval in PM. We then re-examine the neuro-imaging evidence from the lens of the multiprocess framework and suggest some critical modifications to existing neuro-cognitive interpretations of the neuro-imaging results. These modifications illuminate possible directions and refinements for further neuro-imaging investigations of PM. PMID:26236213

  10. 25 CFR 170.801 - What is the BIA Road Maintenance Program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the BIA Road Maintenance Program? 170.801 Section... ROADS PROGRAM BIA Road Maintenance § 170.801 What is the BIA Road Maintenance Program? The BIA Road... subpart contains a list of activities that are eligible for funding under the BIA road maintenance program. ...

  11. Transcriptome-wide analyses indicate mitochondrial responses to particulate air pollution exposure.

    PubMed

    Winckelmans, Ellen; Nawrot, Tim S; Tsamou, Maria; Den Hond, Elly; Baeyens, Willy; Kleinjans, Jos; Lefebvre, Wouter; Van Larebeke, Nicolas; Peusens, Martien; Plusquin, Michelle; Reynders, Hans; Schoeters, Greet; Vanpoucke, Charlotte; de Kok, Theo M; Vrijens, Karen

    2017-08-18

    Due to their lack of repair capacity mitochondria are critical targets for environmental toxicants. We studied genes and pathways reflecting mitochondrial responses to short- and medium-term PM 10 exposure. Whole genome gene expression was measured in peripheral blood of 98 adults (49% women). We performed linear regression analyses stratified by sex and adjusted for individual and temporal characteristics to investigate alterations in gene expression induced by short-term (week before blood sampling) and medium-term (month before blood sampling) PM 10 exposure. Overrepresentation analyses (ConsensusPathDB) were performed to identify enriched mitochondrial associated pathways and gene ontology sets. Thirteen Human MitoCarta genes were measured by means of quantitative real-time polymerase chain reaction (qPCR) along with mitochondrial DNA (mtDNA) content in an independent validation cohort (n = 169, 55.6% women). Overrepresentation analyses revealed significant pathways (p-value <0.05) related to mitochondrial genome maintenance and apoptosis for short-term exposure and to the electron transport chain (ETC) for medium-term exposure in women. For men, medium-term PM 10 exposure was associated with the Tri Carbonic Acid cycle. In an independent study population, we validated several ETC genes, including UQCRH and COX7C (q-value <0.05), and some genes crucial for the maintenance of the mitochondrial genome, including LONP1 (q-value: 0.07) and POLG (q-value: 0.04) in women. In this exploratory study, we identified mitochondrial genes and pathways associated with particulate air pollution indicating upregulation of energy producing pathways as a potential mechanism to compensate for PM-induced mitochondrial damage.

  12. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible for maintenance under the BIA Road Maintenance Program: (1) BIA transportation facilities listed in...

  13. 40 CFR 93.109 - Criteria and procedures for determining conformity of transportation plans, programs, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) through (k) of this section explain when the budget, interim emissions, and hot-spot tests are required... § 93.115 Project from a conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10... Currently conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10 and PM2.5 control...

  14. 40 CFR 93.109 - Criteria and procedures for determining conformity of transportation plans, programs, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) through (k) of this section explain when the budget, interim emissions, and hot-spot tests are required... § 93.115 Project from a conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10... Currently conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10 and PM2.5 control...

  15. Region 8: Colorado Telluride Adequate Letter (8/17/2011)

    EPA Pesticide Factsheets

    This March 4, 2011 letter from EPA to Chistopher E. Urbina M.D., MPH, Colorado Department of Public Health and Environment states that EPA has found that the Telluride, CO PM10 maintenance plan and the 2021 motor vehicle emisssions budget (MVEB) adequate

  16. Region 8: Colorado Canon City Adequate Letter (8/17/2011)

    EPA Pesticide Factsheets

    This May 4, 2011 letter from EPA to Chistopher E. Urbina M.D., MPH, Colorado Department of Public Health and Environment states that EPA has found that the Canon City PM10 maintenance plan and the 2020 motor vehicle emissions budget (MVEB) adequate

  17. Region 8: Colorado Pagosa Springs Adequate Letter (8/17/2011)

    EPA Pesticide Factsheets

    This March 17, 2011 letter from EPA to Chistopher E. Urbina M.D., MPH, Colorado Department of Public Health and Environment states that EPA has found that the Pagosa Springs, CO PM10 maintenance plan and the 2021 motor vehicle emisssions budget (MVEB)

  18. Peer-Mentored Preparedness (PM-Prep): A New Disaster Preparedness Program for Adults Living Independently in the Community

    ERIC Educational Resources Information Center

    Eisenman, David Paul; Bazzano, Alicia; Koniak-Griffin, Deborah; Tseng, Chi-hong; Lewis, Mary-Ann; Lamb, Kerry; Lehrer, Danise

    2014-01-01

    The authors studied a health promotion program called PM-Prep (Peer-Mentored Prep), which was designed to improve disaster preparedness among adults living independently in the community. PM-Prep consists of four 2-hour classes co-taught by a health educator and peer-mentors. Adults were randomly assigned to an experimental arm or a wait-list…

  19. 78 FR 49550 - Meetings of Humanities Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... Division of Education Programs. 2. Date: September 09, 2013. Time: 8:30 a.m. to 5:00 p.m. Room: 421. This... Initiatives at Tribal Colleges and Universities grant program, submitted to the Division of Education Programs... Division of Education Programs. 6. Date: September 12, 2013. Time: 8:30 a.m. to 5:00 p.m. Room: 421. This...

  20. 20 CFR 411.250 - How will SSA evaluate a PM?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 411.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work Program... determine the PM's final rating. (c) These performance evaluations will be made part of our database on...

  1. 20 CFR 411.250 - How will SSA evaluate a PM?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 411.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work Program... determine the PM's final rating. (c) These performance evaluations will be made part of our database on...

  2. 20 CFR 411.250 - How will SSA evaluate a PM?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 411.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work Program... determine the PM's final rating. (c) These performance evaluations will be made part of our database on...

  3. 20 CFR 411.250 - How will SSA evaluate a PM?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 411.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work Program... determine the PM's final rating. (c) These performance evaluations will be made part of our database on...

  4. 77 FR 59100 - Approval and Promulgation of Implementation Plans; Alabama: General and Transportation Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... PM 10 surrogate program; and (5) require states to account for gases that condense to form particles (condensables) in PM 2.5 and PM 10 emission limits in PSD NNSR permits. Additionally, the NSR PM 2.5 Rule... PSD portion of the State's May 2, 2011, SIP revision. 1. PM 10 Surrogate and Grandfathering Policy In...

  5. Distinct Neural Circuits Support Transient and Sustained Processes in Prospective Memory and Working Memory

    PubMed Central

    West, Robert; Braver, Todd

    2009-01-01

    Current theories are divided as to whether prospective memory (PM) involves primarily sustained processes such as strategic monitoring, or transient processes such as the retrieval of intentions from memory when a relevant cue is encountered. The current study examined the neural correlates of PM using a functional magnetic resonance imaging design that allows for the decomposition of brain activity into sustained and transient components. Performance of the PM task was primarily associated with sustained responses in a network including anterior prefrontal cortex (lateral Brodmann area 10), and these responses were dissociable from sustained responses associated with active maintenance in working memory. Additionally, the sustained responses in anterior prefrontal cortex correlated with faster response times for prospective responses. Prospective cues also elicited selective transient activity in a region of interest along the right middle temporal gyrus. The results support the conclusion that both sustained and transient processes contribute to efficient PM and provide novel constraints on the functional role of anterior PFC in higher-order cognition. PMID:18854581

  6. CHARACTERIZATION OF THE FUGITIVE PARTICULATE EMISSIONS FROM CONSTRUCTION MUD/DIRT CARRYOUT

    EPA Science Inventory

    The paper describes a research program which directly determined mud/dirt carryout emission factors for both particulate matter (PM) with aerodynamic diameters of 10 micrometers or less (PM10) and PM with aerodynamic diameters of 2.5 micrometers or less (PM2.5). The research was ...

  7. Naval Aviation IMA Repair Capability: A Readiness to Resources Approach.

    DTIC Science & Technology

    1983-12-01

    systems commands and offices. 3, .-. e , No. cFE 0000 CP15PATL OR BMS REouWE gKIATRE_ woms CENTIP KEOscu. coNTiO.mI AMoCES COPYw co 5( US &Lp6J4 PE PM3K...U December 1983 " Thesis Advisor: A. W. McMasters Approved for public release; distribution unlimited. 4𔃺 8 4 04 25 069 -* ,** *- a’’ e ...29 2. Maintenance/Supply InterrelationshiDs ------ 32 E . MAINTENANCE DATA SYSTEM ------------------------- 33 IV. PLANNING "I" LEVEL

  8. A comparison of a mini-PEMS and a 1065 compliant PEMS for on-road gaseous and particulate emissions from a light duty diesel truck.

    PubMed

    Yang, Jiacheng; Durbin, Thomas D; Jiang, Yu; Tange, Takeshi; Karavalakis, Georgios; Cocker, David R; Johnson, Kent C

    2018-05-31

    The primary goal of this study was to compare emissions measurements between a 1065 compliant PEMS, and the NTK Compact Emissions Meter (NCEM) capable of measuring NOx, PM, and solid PN. Both units were equipped on a light-duty diesel truck and tested over local, highway, and downtown driving routes. The results indicate that the NOx measurements for the NCEM were within approximately ±10% of those the 1065 compliant PEMS, which suggests that the NCEM could be used as a screening tool for NOx emissions. The NCEM showed larger differences for PM emissions on an absolute level, but this was at PM levels well below the 1 mg/mi level. The NCEM differences ranged from -2% to +26% if the comparisons are based on a percentage of the 1.0 mg/mi standard. Larger differences were also seen for PN emissions, with the NCEM measuring higher PN emissions, which can primarily be attributed to a zero current offset that we observed for the NCEM, which has been subsequently improved in the latest generation of the NCEM system. The comparisons between the 1065 compliant PEMS and the NCEM suggest that there could be applications for the NCEM or other mini-PEMS for applications such as identification of potential issues by regulatory agencies, manufacturer evaluation and validation of emissions under in-use conditions, and potential use in inspection and maintenance (I/M) programs, especially for heavy-duty vehicles. Copyright © 2017. Published by Elsevier B.V.

  9. Implementing the PM Programming Language using MPI and OpenMP - a New Tool for Programming Geophysical Models on Parallel Systems

    NASA Astrophysics Data System (ADS)

    Bellerby, Tim

    2015-04-01

    PM (Parallel Models) is a new parallel programming language specifically designed for writing environmental and geophysical models. The language is intended to enable implementers to concentrate on the science behind the model rather than the details of running on parallel hardware. At the same time PM leaves the programmer in control - all parallelisation is explicit and the parallel structure of any given program may be deduced directly from the code. This paper describes a PM implementation based on the Message Passing Interface (MPI) and Open Multi-Processing (OpenMP) standards, looking at issues involved with translating the PM parallelisation model to MPI/OpenMP protocols and considering performance in terms of the competing factors of finer-grained parallelisation and increased communication overhead. In order to maximise portability, the implementation stays within the MPI 1.3 standard as much as possible, with MPI-2 MPI-IO file handling the only significant exception. Moreover, it does not assume a thread-safe implementation of MPI. PM adopts a two-tier abstract representation of parallel hardware. A PM processor is a conceptual unit capable of efficiently executing a set of language tasks, with a complete parallel system consisting of an abstract N-dimensional array of such processors. PM processors may map to single cores executing tasks using cooperative multi-tasking, to multiple cores or even to separate processing nodes, efficiently sharing tasks using algorithms such as work stealing. While tasks may move between hardware elements within a PM processor, they may not move between processors without specific programmer intervention. Tasks are assigned to processors using a nested parallelism approach, building on ideas from Reyes et al. (2009). The main program owns all available processors. When the program enters a parallel statement then either processors are divided out among the newly generated tasks (number of new tasks < number of processors) or tasks are divided out among the available processors (number of tasks > number of processors). Nested parallel statements may further subdivide the processor set owned by a given task. Tasks or processors are distributed evenly by default, but uneven distributions are possible under programmer control. It is also possible to explicitly enable child tasks to migrate within the processor set owned by their parent task, reducing load unbalancing at the potential cost of increased inter-processor message traffic. PM incorporates some programming structures from the earlier MIST language presented at a previous EGU General Assembly, while adopting a significantly different underlying parallelisation model and type system. PM code is available at www.pm-lang.org under an unrestrictive MIT license. Reference Ruymán Reyes, Antonio J. Dorta, Francisco Almeida, Francisco de Sande, 2009. Automatic Hybrid MPI+OpenMP Code Generation with llc, Recent Advances in Parallel Virtual Machine and Message Passing Interface, Lecture Notes in Computer Science Volume 5759, 185-195

  10. 25 CFR 170.2 - What is the IRR Program and BIA Road Maintenance Program policy?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the IRR Program and BIA Road Maintenance Program... and BIA Road Maintenance Program policy? (a) It is the policy of the Secretary of the Interior and the... designed to enable Indian tribes to participate in all contractible IRR and BIA Road Maintenance programs...

  11. 77 FR 31339 - Board of Visitors, United States Military Academy (USMA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... DEPARTMENT OF DEFENSE Department of the Army Board of Visitors, United States Military Academy... States Military Academy Board of Visitors. 2. Date: Thursday, June 14, 2012. 3. Time: 12:00 p.m.-2:30 p.m... and Military Programs, to include Summer Training; the Academic Program, Summer Term Academic Program...

  12. 20 CFR 411.655 - How will the PM refer the dispute to us?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false How will the PM refer the dispute to us? 411.655 Section 411.655 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Ticket to Work Program Dispute Resolution Disputes Between Employment Networks and Program...

  13. 20 CFR 411.655 - How will the PM refer the dispute to us?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false How will the PM refer the dispute to us? 411.655 Section 411.655 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Ticket to Work Program Dispute Resolution Disputes Between Employment Networks and Program...

  14. 20 CFR 411.655 - How will the PM refer the dispute to us?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false How will the PM refer the dispute to us? 411.655 Section 411.655 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Ticket to Work Program Dispute Resolution Disputes Between Employment Networks and Program...

  15. 20 CFR 411.655 - How will the PM refer the dispute to us?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false How will the PM refer the dispute to us? 411.655 Section 411.655 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Ticket to Work Program Dispute Resolution Disputes Between Employment Networks and Program...

  16. 20 CFR 411.655 - How will the PM refer the dispute to us?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false How will the PM refer the dispute to us? 411.655 Section 411.655 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Ticket to Work Program Dispute Resolution Disputes Between Employment Networks and Program...

  17. THE SUPERSITES PROGRAM

    EPA Science Inventory

    The PM2.5 monitoring program is dominated by gravimetric measurements (over 1000 mass samplers nationwide) specific for indicator mass, where the primary objective is comparisons with the PM2.5 National Ambient Air Quality Standards (NAAQS). The other major component of the net...

  18. Support for the 2007 Meeting of the Society for Mathematical Psychology

    DTIC Science & Technology

    2007-12-10

    Ballroom: Salons A,B,&C 1 1:45am-l:15pm Lunch (provided) Lakeside Area 1:15pm-4:00pm Symposia & Talk Sessions Ballroom: Salons A,B,&C 4:30pm-5:30pm Plenary...Symposia & Talk Sessions Ballroom: Salons A,B,&C 11:45am-1:15pm Lunch (provided) Lakeside Area 1:1 5pm-4:00pm Symposia & Talk Sessions Ballroom: Salons A,B...Sat 7:45am-8:45am Breakfast (provided) Lakeside Area 9:00am-1 1:45am Symposia & Talk Sessions Ballroom: Salons A,B,&C Program Overview Plenary

  19. 48 CFR 301.607-75 - Maintenance of FAC-P/PM certification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... document completion of all training. If the required CLPs are not earned within each 2-year period, a FAC-P...) Training activities, such as teaching, self-directed study, and mentoring; (2) Courses completed to achieve... professional seminars/symposia/conferences, publishing papers, and attending workshops; (4) Educational...

  20. 48 CFR 301.607-75 - Maintenance of FAC-P/PM certification.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... document completion of all training. If the required CLPs are not earned within each 2-year period, a FAC-P...) Training activities, such as teaching, self-directed study, and mentoring; (2) Courses completed to achieve... professional seminars/symposia/conferences, publishing papers, and attending workshops; (4) Educational...

  1. 48 CFR 301.607-75 - Maintenance of FAC-P/PM certification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... document completion of all training. If the required CLPs are not earned within each 2-year period, a FAC-P...) Training activities, such as teaching, self-directed study, and mentoring; (2) Courses completed to achieve... professional seminars/symposia/conferences, publishing papers, and attending workshops; (4) Educational...

  2. 48 CFR 301.607-75 - Maintenance of FAC-P/PM certification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... document completion of all training. If the required CLPs are not earned within each 2-year period, a FAC-P...) Training activities, such as teaching, self-directed study, and mentoring; (2) Courses completed to achieve... professional seminars/symposia/conferences, publishing papers, and attending workshops; (4) Educational...

  3. “Working to shape what society's expectations of us should be”: Philip Morris' societal alignment strategy

    PubMed Central

    Yang, J S; Malone, R E

    2009-01-01

    Background A key element of Philip Morris's (PM's) corporate social responsibility initiatives is “societal alignment”, defined as “strategies and programs to meet society's expectations of a responsible tobacco company”. This study explored the genesis and implementation of Philip Morris' (PM) societal alignment efforts. Methods The study retrieved and analysed approximately 375 previously undisclosed PM documents now available electronically. Using an iterative process, the study categorised themes and prepared a case analysis. Results Beginning in 1999, PM sought to become “societally aligned” by identifying expectations of a responsible tobacco company through public opinion research and developing and publicising programs to meet those expectations. Societal alignment was undertaken within the US and globally to ensure an environment favourable to PM's business objectives. Despite PM's claims to be “changing”, however, societal alignment in practice was highly selective. PM responded to public “expectations” largely by retooling existing positions and programs, while entirely ignoring other expectations that might have interfered with its business goals. It also appears that convincing employees of the value and authenticity of societal alignment was difficult. Conclusions As implementation of the Framework Convention on Tobacco Control proceeds, tobacco control advocates should closely monitor development of such “alignment” initiatives and expose the motivations and contradictions they reveal. PMID:18845623

  4. "Working to shape what society's expectations of us should be": Philip Morris' societal alignment strategy.

    PubMed

    Yang, J S; Malone, R E

    2008-12-01

    A key element of Philip Morris's (PM's) corporate social responsibility initiatives is "societal alignment", defined as "strategies and programs to meet society's expectations of a responsible tobacco company". This study explored the genesis and implementation of Philip Morris' (PM) societal alignment efforts. The study retrieved and analysed approximately 375 previously undisclosed PM documents now available electronically. Using an iterative process, the study categorised themes and prepared a case analysis. Beginning in 1999, PM sought to become "societally aligned" by identifying expectations of a responsible tobacco company through public opinion research and developing and publicising programs to meet those expectations. Societal alignment was undertaken within the US and globally to ensure an environment favourable to PM's business objectives. Despite PM's claims to be "changing", however, societal alignment in practice was highly selective. PM responded to public "expectations" largely by retooling existing positions and programs, while entirely ignoring other expectations that might have interfered with its business goals. It also appears that convincing employees of the value and authenticity of societal alignment was difficult. As implementation of the Framework Convention on Tobacco Control proceeds, tobacco control advocates should closely monitor development of such "alignment" initiatives and expose the motivations and contradictions they reveal.

  5. 40 CFR 52.1773 - Conditional approval.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Deterioration (PSD) infrastructure requirements for the 1997 annual and 2006 24-hour fine particulate matter... to the PM2.5 standard for their PSD program and committing to providing the necessary SIP revision to... PM2.5 Rule (including PM2.5 PSD Increment-SILs-SMC, as it relates to PM2.5 increments to meet the...

  6. 40 CFR 52.1773 - Conditional approval.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Deterioration (PSD) infrastructure requirements for the 1997 annual and 2006 24-hour fine particulate matter... to the PM2.5 standard for their PSD program and committing to providing the necessary SIP revision to... PM2.5 Rule (including PM2.5 PSD Increment-SILs-SMC, as it relates to PM2.5 increments to meet the...

  7. Comparative analysis of specialization in palliative medicine processes within the World Health Organization European region.

    PubMed

    Centeno, Carlos; Bolognesi, Deborah; Biasco, Guido

    2015-05-01

    Palliative medicine (PM), still in the development phase, is a new, growing specialty aimed at caring for both oncology and non-oncology patients. There is still confusion about the training offered in the various European PM certification programs. To provide a detailed, comparative update and analysis of the PM certification process in Europe, including the different training approaches and their main features. Experts from each country completed an online survey addressing historical background, program name, training requirements, length of time in training, characteristic and content, official certifying institution, effectiveness of accreditation, and 2013 workforce capacity. We prepared a comparative analysis of the data provided. In 2014, 18 of 53 European countries had official programs on specialization in PM (POSPM): Czech Republic, Denmark, Finland, France, Georgia, Germany, Hungary, Ireland, Israel, Italy, Latvia, Malta, Norway, Poland, Portugal, Romania, Slovakia, and the U.K. Ten of these programs were begun in the last five years. The PM is recognized as a "specialty," "subspecialty," or "special area of competence," with no substantial differences between the last two designations. The certification contains the term "palliative medicine" in most countries. Clinical training varies, with one to two years being the most frequent duration. There is a clear trend toward establishing the POSPM as a mandatory condition for obtaining a clinical PM position in countries' respective health systems. PM is growing as a specialization field in Europe. Processes leading to certification are generally long and require substantial clinical training. The POSPM education plans are heterogeneous. The European Association for Palliative Care should commit to establishing common learning standards, leading to additional European-based recognition of expertise in PM. Copyright © 2015 American Academy of Hospice and Palliative Medicine. Published by Elsevier Inc. All rights reserved.

  8. Virtual reality simulators: valuable surgical skills trainers or video games?

    PubMed

    Willis, Ross E; Gomez, Pedro Pablo; Ivatury, Srinivas J; Mitra, Hari S; Van Sickle, Kent R

    2014-01-01

    Virtual reality (VR) and physical model (PM) simulators differ in terms of whether the trainee is manipulating actual 3-dimensional objects (PM) or computer-generated 3-dimensional objects (VR). Much like video games (VG), VR simulators utilize computer-generated graphics. These differences may have profound effects on the utility of VR and PM training platforms. In this study, we aimed to determine whether a relationship exists between VR, PM, and VG platforms. VR and PM simulators for laparoscopic camera navigation ([LCN], experiment 1) and flexible endoscopy ([FE] experiment 2) were used in this study. In experiment 1, 20 laparoscopic novices played VG and performed 0° and 30° LCN exercises on VR and PM simulators. In experiment 2, 20 FE novices played VG and performed colonoscopy exercises on VR and PM simulators. In both experiments, VG performance was correlated with VR performance but not with PM performance. Performance on VR simulators did not correlate with performance on respective PM models. VR environments may be more like VG than previously thought. © 2013 Published by Association of Program Directors in Surgery on behalf of Association of Program Directors in Surgery.

  9. 2008 Munitions Executive Summit

    DTIC Science & Technology

    2008-02-21

    7:00pm Hosted Reception 2008 Munitions Executive Summit February 20, 2008 – AGENDA (cont.) 8:00am Administrative Remarks 8:05am PEO Keynote Address...MES Awards Tuesday, February 19 5pm Reception /Pre-registration Sponsored by ATK Ammunition Systems Group and Kaman Aerospace’s Fuzing...15pm Adjourn 5:15pm - 7pm Hosted Reception Sponsored by DSE, Inc. and General Dynamics-OTS Munitions executive suMMit 2008 agenda & prograM

  10. Quality-assured measurements of animal building emissions: particulate matter concentrations.

    PubMed

    Heber, Albert J; Lim, Teng-Teeh; Ni, Ji-Qin; Tao, Pei-Chun; Schmidt, Amy M; Koziel, Jacek A; Hoff, Steven J; Jacobson, Larry D; Zhang, Yuanhui; Baughman, Gerald B

    2006-12-01

    Federally funded, multistate field studies were initiated in 2002 to measure emissions of particulate matter (PM) < 10 microm (PM10) and total suspended particulate (TSP), ammonia, hydrogen sulfide, carbon dioxide, methane, nonmethane hydrocarbons, and odor from swine and poultry production buildings in the United States. This paper describes the use of a continuous PM analyzer based on the tapered element oscillating microbalance (TEOM). In these studies, the TEOM was used to measure PM emissions at identical locations in paired barns. Measuring PM concentrations in swine and poultry barns, compared with measuring PM in ambient air, required more frequent maintenance of the TEOM. External screens were used to prevent rapid plugging of the insect screen in the PM10 preseparator inlet. Minute means of mass concentrations exhibited a sinusoidal pattern that followed the variation of relative humidity, indicating that mass concentration measurements were affected by water vapor condensation onto and evaporation of moisture from the TEOM filter. Filter loading increased the humidity effect, most likely because of increased water vapor adsorption capacity of added PM. In a single layer barn study, collocated TEOMs, equipped with TSP and PM10 inlets, corresponded well when placed near the inlets of exhaust fans in a layer barn. Initial data showed that average daily mean concentrations of TSP, PM10, and PM2.5 concentrations at a layer barn were 1440 +/- 182 microg/m3 (n = 2), 553 +/- 79 microg/m3 (n = 4), and 33 +/- 75 microg/m3 (n = 1), respectively. The daily mean TSP concentration (n = 1) of a swine barn sprinkled with soybean oil was 67% lower than an untreated swine barn, which had a daily mean TSP concentration of 1143 +/- 619 microg/m3. The daily mean ambient TSP concentration (n = 1) near the swine barns was 25 +/- 8 microg/m3. Concentrations of PM inside the swine barns were correlated to pig activity.

  11. Florida maintenance rating program (MRP) assessment and enhancement : final report, May 28, 2008 [summary].

    DOT National Transportation Integrated Search

    2008-01-01

    The Florida Department of Transportation : (FDOT) has used its maintenance rating : program (MRP) to evaluate the states : highway maintenance conditions and : determine asset maintenance needs since : 1985. Periodic evaluation of the program is :...

  12. 46th Annual Targets, UAVs and Range Operations Symposium and Exhibition

    DTIC Science & Technology

    2008-10-10

    introduction  mr. Ken Hislop , QF-16 Program manager, eglin aFB, FL 1:40 Pm - 2:00 Pm U.s. navy  CaPt Pat Buckley, Usn, Program manager...Bruce Ringstad Subscale & TCS Flight Lead Mr. Jim Cornwell Program Manager Mr. Ken Hislop Program Manager Ms. Lee Neugin Program Manager & Lead...Missiles Fired / 18 Kills AAC/PA 09-26-08-429 18 QF-16 Air Superiority Target Program Manager: Mr. Ken Hislop Description Full Scale Target for Threat

  13. Assessing the impact of a wood stove replacement program on air quality and children's health.

    PubMed

    Noonan, Curtis W; Ward, Tony J; Navidi, William; Sheppard, Lianne; Bergauff, Megan; Palmer, Chris

    2011-12-01

    Many rural mountain valley communities experience elevated ambient levels of fine particulate matter (PM*) in the winter, because of contributions from residential wood-burning appliances and sustained temperature inversion periods during the cold season. A wood stove change-out program was implemented in a community heavily affected by wood-smoke-derived PM2.5 (PM < or = 2.5 microm in aerodynamic diameter). The objectives of this study were to evaluate the impact of this intervention program on ambient and indoor PM2.5 concentrations and to identify possible corresponding changes in the frequency of childhood respiratory symptoms and infections and illness-related school absences. Over 1100 old wood stoves were replaced with new EPA-certified wood stoves or other heating sources. Ambient PM2.5 concentrations were 30% lower in the winter after the changeout program, compared with baseline winters, which brought the community's ambient air within the PM2.5 standards of the U.S. Environmental Protection Agency (U.S. EPA). The installation of a new wood stove resulted in an overall reduction in indoor PM2.5 concentrations in a small sample of wood-burning homes, but the effects were highly variable across homes. Community-level reductions in wood-smoke-derived PM2.5 concentration were associated with decreased reports of childhood wheeze and of other childhood respiratory health conditions. The association was not limited to children living in homes with wood stoves nor does it appear to be limited to susceptible children (e.g., children with asthma). Community-level reductions in wood-smoke-derived PM2.5 concentration were also associated with lower illness-related school absences among older children, but this finding was not consistent across all age-groups. This community-level intervention provided a unique opportunity to prospectively observe exposure and outcome changes resulting from a targeted air pollution reduction strategy.

  14. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Transportation Facility Maintenance Program A Appendix A to Subpart G Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... Transportation Facility Maintenance Program The following activities are eligible for BIA Transportation Facility...

  15. 77 FR 68771 - Pesticide Program Dialogue Committee; Notice of Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... follows: PPDC Work Group on Integrated Pest Management; PPDC Work Group on Comparative Safety Statements.... to 4 p.m.; Comparative Safety Statements from 1 p.m. to 4 p.m.; and Pollinator Protection from 1 p.m..., 2012, in room S- 4850-70 Potomac Yards South. The PPDC Work Group on Comparative Safety Statements will...

  16. 40 CFR 52.1602 - Control strategy and regulations: PM2.5.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Control strategy and regulations: PM2.5... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Jersey § 52.1602 Control strategy and regulations: PM2.5. (a) Approval—On May 18, 2006, New Jersey submitted an early PM2.5...

  17. Defense Coastal/Estuarine Research Program (DCERP) Baseline Monitoring Plan

    DTIC Science & Technology

    2007-09-19

    climatological stress (e.g., temperature, drought) and shorter-term air pollutant stress (oxidants and metals ). Heavy metals of fine PM have been...speciation of the fine and coarse PM fractions will allow distinction between different PM sources such as wind blown soil dust, including dust...emitting 12% of the total PM2.5 mass (U.S. EPA, 2004b). Source apportionment modeling of PM2.5 mass concentrations from 24 Speciation Defense Coastal

  18. 76 FR 38404 - Center for Scientific Review; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ...; Shared Instrumentation: Grant Program Ultrasound Imaging S10. Date: July 19, 2011. Time: 1 p.m. to 5 p.m... Trials for Imaging and Image-Guided Interventions; Exploratory Grants. Date: July 14, 2011. Time: 1 p.m...

  19. A Virtual Week study of prospective memory function in autism spectrum disorders.

    PubMed

    Henry, Julie D; Terrett, Gill; Altgassen, Mareike; Raponi-Saunders, Sandra; Ballhausen, Nicola; Schnitzspahn, Katharina M; Rendell, Peter G

    2014-11-01

    Prospective memory (PM) refers to the implementation of delayed intentions, a cognitive ability that plays a critical role in daily life because of its involvement in goal-directed behavior and consequently the development and maintenance of independence. Emerging evidence indicates that PM may be disrupted in autism spectrum disorders (ASDs), potentially contributing to the functional difficulties that characterize this group. However, the degree, nature, and specificity of ASD-related impairment remains poorly understood. In the current study, children between 8 and 12 years of age who were diagnosed with ASDs (n=30) were compared with typically developing children (n=30) on a child-appropriate version of the Virtual Week board game. This measure provides an opportunity to investigate the different sorts of PM failures that occur. The ASD group showed significant PM impairment on measures of time-based (but not event-based) prospective remembering. However, only a subtle difference emerged between regular and irregular PM tasks, and group differences were consistent across these tasks. Because regular and irregular tasks differentially load retrospective memory, these data imply that the PM difficulties seen in ASDs may primarily reflect a monitoring deficit and not an encoding and memory storage deficit. PM performance was poorer under conditions of high ongoing task absorption, but the magnitude of this effect did not vary as a function of group. In both groups, time-based (but not event-based) PM difficulties were associated with functional outcomes in daily life, but only an inconsistent association with executive control emerged. Copyright © 2014 Elsevier Inc. All rights reserved.

  20. Can First and Second Grade Students Benefit from an Alcohol Use Prevention Program?

    ERIC Educational Resources Information Center

    Bell, Mary Lou; Padget, Alison; Kelley-Baker, Tara; Rider, Raamses

    2007-01-01

    Protecting You/Protecting Me (PY/PM) is a classroombased, alcohol use prevention and vehicle safety program for elementary students from first through fifth grades developed by Mothers Against Drunk Driving (MADD). PY/PM is one of the first alcohol prevention programs to target children as early as first grade. The focus of this study is on the…

  1. Increases in wintertime PM2.5 sodium and chloride linked to snowfall and road salt application

    NASA Astrophysics Data System (ADS)

    Kolesar, Katheryn R.; Mattson, Claire N.; Peterson, Peter K.; May, Nathaniel W.; Prendergast, Rashad K.; Pratt, Kerri A.

    2018-03-01

    The application of salts and salty brines to roads is common practice during the winter in many urban environments. Road salts can become aerosolized, thereby injecting sodium and chloride particulate matter (PM) into the atmosphere. Here, data from the United States Environmental Protection Agency Chemical Speciation Monitoring Network were used to assess temporal trends of sodium and chloride PM2.5 (PM < 2.5 μm) at 25 locations across the United States to investigate the ubiquity of road salt aerosols. Sodium and chloride PM2.5 concentrations were an average of three times higher in the winter, as compared to the summer, for locations with greater than 25 cm of average annual snowfall. Winter urban chloride PM2.5 concentrations attributed to road salt can even sometimes rival those of coastal sea spray aerosol-influenced sites. In most snow-influenced cities, chloride and sodium PM2.5 concentrations were positively correlated with snowfall; however, this relationship is complicated by differences in state and local winter maintenance practices. This study highlights the ubiquity of road salt aerosols in the United States and their potential impact on wintertime urban air quality, particularly due to the potential for multiphase reactions to liberate chlorine from the particle-phase. Since road salt application is a common practice in wintertime urban environments across the world, it is imperative that road salt application emissions, currently not included in inventories, and its impacts be investigated through measurements and modeling.

  2. Graduate Medical Education Funding and Curriculum in Physical Medicine and Rehabilitation: A Survey of Physical Medicine and Rehabilitation Department Chairs.

    PubMed

    Perret, Danielle; Knowlton, Tiffany; Worsowicz, Gregory

    2018-03-01

    This national survey highlights graduate medical education funding sources for physical medicine and rehabilitation (PM&R) residency programs as well as perceived funding stability, alignment of the current funding and educational model, the need of further education in postacute care settings, and the practice of contemporary PM&R graduates as perceived by PM&R department/division chairs. Approximately half of the reported PM&R residency positions seem to be funded by Centers of Medicare and Medicaid Services; more than 40% of PM&R chairs believe that their residency program is undersized and nearly a quarter feel at risk for losing positions. A total of 30% of respondents report PM&R resident experiences in home health, 15% in long-term acute care, and 52.5% in a skilled nursing facility/subacute rehabilitation facility. In programs that do not offer these experiences, most chairs feel that this training should be included. In addition, study results suggest that most PM&R graduates work in an outpatient setting. Based on the results that chairs strongly feel the need for resident education in postacute care settings and that most graduates go on to practice in outpatient settings, there is a potential discordance for our current Centers of Medicare and Medicaid Services graduate medical education funding model being linked to the acute care setting.

  3. 76 FR 26720 - 2011 Annual Meeting of the Ozone Transport Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... efficiency, architectural industrial and maintenance coatings, consumer products, institution commercial and..., aftermarket catalysts, lightering, and non- road idling. DATES: The meeting will be held on June 15, 2011 starting at 9 a.m. and ending at 3:30 p.m. Location: Washington Marriott Wardman Park, 2660 Woodley Road NW...

  4. 78 FR 34892 - Drawbridge Operation Regulation; Middle River, Near Stockton, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ..., CA. The deviation is to allow San Joaquin County Public Works Department to perform structural maintenance work to the bridge. This deviation allows the bridge to remain in the closed-to-navigation... West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday...

  5. 76 FR 17585 - Approval and Promulgation of Implementation Plans; State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-30

    ... 1997 revisions to the National Ambient Air Quality Standards (NAAQS) for ozone. Section 110(a)(1... modeling to assure attainment and maintenance of the applicable standards. By statute, SIPs meeting the... ozone and PM 2.5 NAAQS.\\1\\ EPA will address these elements below under the following headings: (A...

  6. 77 FR 58955 - Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of Pennsylvania...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ...) Infrastructure Requirements for the 1997 8-Hour Ozone and the 1997 and 2006 Fine Particulate Matter National..., modeling, legal authority, and adequate resources necessary to assure attainment and maintenance of the... addressing the infrastructure requirements for the 1997 8-hour ozone and fine particulate matter (PM 2.5...

  7. 75 FR 6203 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... greater transparency to the FDIC about their business models, capital structures, management, interaction... the rear of the 17th Street Building (located on F Street), on business days between 7 a.m. and 5 p.m.... Estimated Number of Respondents Investor reports on affiliates--20. Maintenance of business books and...

  8. 76 FR 59600 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Redesignation of Lake and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ...? A. Fine Particulate Standards and Regional Emission Controls B. Background for Indiana's PM 2.5... CAA. The maintenance plan, as revised in the May 26, 2011, submittal, assumes that control of power... replace existing power plant emission control requirements that would have resulted from EPA's Clean Air...

  9. 40 CFR 52.1173 - Control strategy: Particulates.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... on the quantity of total dissolved solids in the quench water. (12) The State adopts and submits... establishes 2023 motor vehicle emissions budgets for the Detroit-Ann Arbor area of 4,360 tpy for primary PM2.5...), has been approved as submitted on July 5, 2011. The maintenance plan establishes 2023 motor vehicle...

  10. Laboratory services series: a programmed maintenance system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuxbury, D.C.; Srite, B.E.

    1980-01-01

    The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

  11. [A design of software for management of hospital equipment maintenance process].

    PubMed

    Xie, Haiyuan; Liu, Yiqing

    2010-03-01

    According to the circumstance of hospital equipment maintenance, we designed a computer program for management of hospital equipment maintenance process by Java programming language. This program can control the maintenance process, increase the efficiency; and be able to fix the equipment location.

  12. 14 CFR 91.1109 - Aircraft maintenance: Inspection program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...

  13. 14 CFR 91.1109 - Aircraft maintenance: Inspection program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...

  14. 14 CFR 91.1109 - Aircraft maintenance: Inspection program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...

  15. 78 FR 21281 - Approval and Promulgation of Implementation Plans; State of Missouri; Infrastructure SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ...EPA is proposing action on four Missouri State Implementation Plan (SIP) submissions. First, EPA is proposing to approve portions of two SIP submissions from the State of Missouri addressing the applicable requirements of Clean Air Act (CAA) for the 1997 and 2006 National Ambient Air Quality Standards (NAAQS) for fine particulate matter (PM2.5). The CAA requires that each state adopt and submit a SIP to support implementation, maintenance, and enforcement of each new or revised NAAQS promulgated by EPA. These SIPs are commonly referred to as ``infrastructure'' SIPs. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA. EPA is also proposing to approve two additional SIP submissions from Missouri, one addressing the Prevention of Significant Deterioration (PSD) program in Missouri, and another addressing the requirements applicable to any board or body which approves permits or enforcement orders of the CAA, both of which support requirements associated with infrastructure SIPs.

  16. Characterization of the fugitive particulate emissions from construction mud/dirt carryout.

    PubMed

    Kinsey, John S; Linna, Kara J; Squier, William C; Muleski, Gregory E; Cowherd, Chatten

    2004-11-01

    Although the fugitive dust associated with construction mud/dirt carryout can represent a substantial portion of the particulate matter (PM) emissions inventory in nonattainment areas, it has not been well characterized by direct sampling methods. In this paper, a research program is described that directly determined both PM10 and PM2.5 (particles < or =10 and 2.5 microm in classical aerodynamic diameter, respectively) emission factors for mud/dirt carryout from a major construction project located in metropolitan Kansas City, MO. The program also assessed the contribution of automotive emissions to the total PM2.5 burden and determined the baseline emissions from the test road. As part of the study, both time-integrated and continuous exposure-profiling methods were used to assess the PM emissions, including particle size and elemental composition. This research resulted in overall PM10 and PM2.5 emission factors of 6 and 0.2 g/vehicle, respectively. Although PM10 is within the range of prior U.S. Environmental Protection Agency (EPA) guidance, the PM2.5 emission factor is far lower than previous estimates published by EPA. In addition, based on both the particle size and chemical data obtained in the study, a major portion of the PM2.5 emissions appears to be attributable to automotive exhaust from light-duty, gasoline-powered vehicles and not to the fugitive dust associated with reentrained mud/dirt carryout.

  17. 25 CFR 170.808 - Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can BIA Road Maintenance Program funds be used to improve... THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.808 Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities? No. BIA Road...

  18. 41 CFR 102-34.285 - Where can we obtain help in setting up a maintenance program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Where can we obtain help in setting up a maintenance program? 102-34.285 Section 102-34.285 Public Contracts and Property... obtain help in setting up a maintenance program? For help in setting up a maintenance program, contact...

  19. 14 CFR 91.1437 - CAMP: Authority to perform and approve maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Ownership Operations Program Management § 91.1437 CAMP: Authority to perform and approve maintenance. A program manager who maintains program aircraft under a CAMP may employ maintenance personnel, or make... maintenance. 91.1437 Section 91.1437 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF...

  20. PM2.5 and Black carbon enhancement at Socheongcho Ocean Research Station in the Yellow Sea

    NASA Astrophysics Data System (ADS)

    Jeon, H.; Rhee, H.; Lee, M.; JinYong, J.; Min, I.; Shim, J.

    2017-12-01

    Socheongcho Ocean Research Station (SORS) has been established in northern Yellow Sea by the Korea Institute of Ocean Science and Technology (KIOST). At SORS, PM2.5 and Black carbon (BC) were measured every 10 minutes during October 2014 June 2017 using beta-ray absorption method (FH62C14, Thermo. Inc, USA) and Multi Angle Absorption Photometer (MAAP; Model 5012, Thermo. Inc, USA), respectively. In addition, CO, CO2 and CH4 were determined by Cavity Ring Down Spectroscopy (CRDS; Model G2401, Picarro. Inc, USA). Measurements were intermittently interrupted for SORS maintenance reasons. For BC and PM2.5, the mean, 90th %tile and maximum concentrations were 1.16, 2.29, and 20.07 ug/m3 and 25, 48, and 177 ug/m3, respectively. There was no clear diurnal variation observed for both species. PM2.5 and BC concentrations were higher in cold seasons than in warm seasons. The highest PM2.5 and BC concentrations (>99th %tile) were more frequently observed in winter. Particularly, the extremely high BC were sporadically observed and lasted for no longer than 1 hour. The possible sources of PM2.5 and BC were examined using Conditional Probability Function (CPF), Potential Source Contribution (PSCF), and Concentration Weighted Trajectory (CWT) analysis. The results suggest the dominant influence from China, particularly for high concentrations.

  1. Consumer familiarity, perspectives and expected value of personalized medicine with a focus on applications in oncology

    PubMed Central

    Garfeld, Susan; Douglas, Michael P; MacDonald, Karen V; Marshall, Deborah A; Phillips, Kathryn A

    2015-01-01

    Aims Knowledge of consumer perspectives of personalized medicine (PM) is limited. Our study assessed consumer perspectives of PM, with a focus on oncology care, to inform industry, clinician and payer stakeholders' programs and policy. Materials & Methods A nationally representative survey of 602 US consumers' ≥30 years old explored familiarity, perspectives and expected value of PM. Results Most (73%) respondents have not heard of ‘personalized medicine,’ though after understanding the term most (95%) expect PM to have a positive beneft. Consumer's willingness to pay is associated with products' impact on survival, rather than predicting disease risk. If testing indicates consumers are not candidates for oncology therapies, most (84%) would seek a second opinion or want therapy anyway. Conclusions Understanding heterogeneity in consumer perspectives of PM can inform program and policy development. PMID:25620993

  2. Using Lean principles to manage throughput on an inpatient rehabilitation unit.

    PubMed

    Chiodo, Anthony; Wilke, Ruste; Bakshi, Rishi; Craig, Anita; Duwe, Doug; Hurvitz, Edward

    2012-11-01

    Performance improvement is a mainstay of operations management and maintenance of certification. In this study at a University Hospital inpatient rehabilitation unit, Lean management techniques were used to manage throughput of patients into and out of the inpatient rehabilitation unit. At the start of this process, the average admission time to the rehabilitation unit was 5:00 p.m., with a median time of 3:30 p.m., and no patients received therapy on the day of admission. Within 8 mos, the mean admission time was 1:22 p.m., 50% of the patients were on the rehabilitation unit by 1:00 p.m., and more than 70% of all patients received therapy on the day of admission. Negative variance from this performance was evaluated, the identification of inefficient discharges holding up admissions as a problem was identified, and a Lean workshop was initiated. Once this problem was tackled, the prime objective of 70% of patients receiving therapy on the date of admission was consistently met. Lean management tools are effective in improving throughput on an inpatient rehabilitation unit.

  3. Report: Decline In EPA Particulate Matter Methods Development Activities May Hamper Timely Achievement of Program Goals

    EPA Pesticide Factsheets

    Report #2003-P-00016, September 30, 2003. EPA has not supported PM2.5 methods development activities to the extent necessary to fully achieve the short- and long-range goals of the PM2.5 program in a timely manner.

  4. Description of Professional Master's Athletic Training Programs

    ERIC Educational Resources Information Center

    Bowman, Thomas G.; Pitney, William A.; Mazerolle, Stephanie M.; Dodge, Thomas M.

    2015-01-01

    Context: Professional master's (PM) athletic training programs (ATPs) are becoming more popular as the profession debates what the entry-level degree should be for athletic training. More information is needed related to the potential benefits of PM ATPs. Objective: Describe the Commission on Accreditation of Athletic Training Education (CAATE)…

  5. 75 FR 57904 - Mid-Atlantic Fishery Management Council (MAFMC); Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... receive a MARCO presentation by Laura McKay, Program Manager Virginia Coastal Zone Program. The Council... Ecosystems and Oceans Planning Committee, its Demersal and Coastal Migratory Committee, its Law Enforcement... Coastal Migratory Committee will meet from 4 p.m. until 5 p.m. The Law Enforcement Committee will meet...

  6. 76 FR 31308 - Board of Visitors, United States Military Academy (USMA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... DEPARTMENT OF DEFENSE Department of the Army Board of Visitors, United States Military Academy... States Military Academy Board of Visitors. 2. Date: Wednesday, June 22, 2011. 3. Time: 12 p.m.-3 p.m... following: Military Program, Physical Program, Intercollegiate Athletics and Fiscal Year 2011 Budget. 7...

  7. Florida maintenance rating program (MRP) assessment and enhancement : final report, May 28, 2008.

    DOT National Transportation Integrated Search

    2008-05-28

    The Maintenance Rating Program (MRP), developed in 1985 by FDOT, is a statewide maintenance system aimed : at evaluating the State highway maintenance conditions, and determining FDOT asset maintenance needs. In the : quest for continuous improvement...

  8. Optimal maintenance policy incorporating system level and unit level for mechanical systems

    NASA Astrophysics Data System (ADS)

    Duan, Chaoqun; Deng, Chao; Wang, Bingran

    2018-04-01

    The study works on a multi-level maintenance policy combining system level and unit level under soft and hard failure modes. The system experiences system-level preventive maintenance (SLPM) when the conditional reliability of entire system exceeds SLPM threshold, and also undergoes a two-level maintenance for each single unit, which is initiated when a single unit exceeds its preventive maintenance (PM) threshold, and the other is performed simultaneously the moment when any unit is going for maintenance. The units experience both periodic inspections and aperiodic inspections provided by failures of hard-type units. To model the practical situations, two types of economic dependence have been taken into account, which are set-up cost dependence and maintenance expertise dependence due to the same technology and tool/equipment can be utilised. The optimisation problem is formulated and solved in a semi-Markov decision process framework. The objective is to find the optimal system-level threshold and unit-level thresholds by minimising the long-run expected average cost per unit time. A formula for the mean residual life is derived for the proposed multi-level maintenance policy. The method is illustrated by a real case study of feed subsystem from a boring machine, and a comparison with other policies demonstrates the effectiveness of our approach.

  9. On-road vehicle emissions and their control in China: A review and outlook.

    PubMed

    Wu, Ye; Zhang, Shaojun; Hao, Jiming; Liu, Huan; Wu, Xiaomeng; Hu, Jingnan; Walsh, Michael P; Wallington, Timothy J; Zhang, K Max; Stevanovic, Svetlana

    2017-01-01

    The large (26-fold over the past 25years) increase in the on-road vehicle fleet in China has raised sustainability concerns regarding air pollution prevention, energy conservation, and climate change mitigation. China has established integrated emission control policies and measures since the 1990s, including implementation of emission standards for new vehicles, inspection and maintenance programs for in-use vehicles, improvement in fuel quality, promotion of sustainable transportation and alternative fuel vehicles, and traffic management programs. As a result, emissions of major air pollutants from on-road vehicles in China have peaked and are now declining despite increasing vehicle population. As might be expected, progress in addressing vehicle emissions has not always been smooth and challenges such as the lack of low sulfur fuels, frauds over production conformity and in-use inspection tests, and unreliable retrofit programs have been encountered. Considering the high emission density from vehicles in East China, enhanced vehicle, fuel and transportation strategies will be required to address vehicle emissions in China. We project the total vehicle population in China to reach 400-500 million by 2030. Serious air pollution problems in many cities of China, in particular high ambient PM 2.5 concentration, have led to pressure to accelerate the progress on vehicle emission reduction. A notable example is the draft China 6 emission standard released in May 2016, which contains more stringent emission limits than those in the Euro 6 regulations, and adds a real world emission testing protocol and a 48-h evaporation testing procedure including diurnal and hot soak emissions. A scenario (PC[1]) considered in this study suggests that increasingly stringent standards for vehicle emissions could mitigate total vehicle emissions of HC, CO, NO X and PM 2.5 in 2030 by approximately 39%, 57%, 59% and 79%, respectively, compared with 2013 levels. With additional actions to control the future light-duty passenger vehicle population growth and use, and introduce alternative fuels and new energy vehicles, the China total vehicle emissions of HC, CO, NO X and PM 2.5 in 2030 could be reduced by approximately 57%, 71%, 67% and 84%, respectively, (the PC[2] scenario) relative to 2013. This paper provides detailed policy roadmaps and technical options related to these future emission reductions for governmental stakeholders. Copyright © 2016 Elsevier B.V. All rights reserved.

  10. 25 CFR 170.2 - What is the IRR Program and BIA Road Maintenance Program policy?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false What is the IRR Program and BIA Road Maintenance Program... INDIAN RESERVATION ROADS PROGRAM Policies, Applicability, and Definitions § 170.2 What is the IRR Program and BIA Road Maintenance Program policy? (a) It is the policy of the Secretary of the Interior and the...

  11. 25 CFR 170.2 - What is the IRR Program and BIA Road Maintenance Program policy?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true What is the IRR Program and BIA Road Maintenance Program... INDIAN RESERVATION ROADS PROGRAM Policies, Applicability, and Definitions § 170.2 What is the IRR Program and BIA Road Maintenance Program policy? (a) It is the policy of the Secretary of the Interior and the...

  12. 25 CFR 170.2 - What is the IRR Program and BIA Road Maintenance Program policy?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false What is the IRR Program and BIA Road Maintenance Program... INDIAN RESERVATION ROADS PROGRAM Policies, Applicability, and Definitions § 170.2 What is the IRR Program and BIA Road Maintenance Program policy? (a) It is the policy of the Secretary of the Interior and the...

  13. Building Maintenance, Management, and Budgeting.

    ERIC Educational Resources Information Center

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  14. 40 CFR 52.378 - Control strategy: PM10

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Control strategy: PM10 52.378 Section 52.378 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.378 Control strategy: PM10 (a) Approval...

  15. 14 CFR 125.247 - Inspection programs and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance § 125.247 Inspection programs and maintenance. (a) No person may operate an airplane subject to this part unless (1... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Inspection programs and maintenance. 125...

  16. 14 CFR 125.247 - Inspection programs and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance § 125.247 Inspection programs and maintenance. (a) No person may operate an airplane subject to this part unless (1... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Inspection programs and maintenance. 125...

  17. 14 CFR 125.247 - Inspection programs and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance § 125.247 Inspection programs and maintenance. (a) No person may operate an airplane subject to this part unless (1... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Inspection programs and maintenance. 125...

  18. 14 CFR 125.247 - Inspection programs and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance § 125.247 Inspection programs and maintenance. (a) No person may operate an airplane subject to this part unless (1... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Inspection programs and maintenance. 125...

  19. 14 CFR 125.247 - Inspection programs and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance § 125.247 Inspection programs and maintenance. (a) No person may operate an airplane subject to this part unless (1... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Inspection programs and maintenance. 125...

  20. AUTOMOTIVE DIESEL MAINTENANCE. PROGRAM OUTLINE.

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    INFORMATIONAL TOPICS COVERED IN THE TEXT MATERIALS AND SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILMS FOR A 2-YEAR, 55 MODULE PROGRAM IN AUTOMOTIVE DIESEL MAINTENANCE ARE GIVEN. THE 30 MODULES FOR "AUTOMOTIVE DIESEL MAINTENANCE 1" ARE AVAILABLE AS VT 005 655 - VT 005 684, AND THE 25 MODULES FOR "AUTOMOTIVE DIESEL MAINTENANCE 2" ARE AVAILABLE…

  1. Implementing a Reliability Centered Maintenance Program at NASA's Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Tuttle, Raymond E.; Pete, Robert R.

    1998-01-01

    Maintenance practices have long focused on time based "preventive maintenance" techniques. Components were changed out and parts replaced based on how long they had been in place instead of what condition they were in. A reliability centered maintenance (RCM) program seeks to offer equal or greater reliability at decreased cost by insuring only applicable, effective maintenance is performed and by in large part replacing time based maintenance with condition based maintenance. A significant portion of this program involved introducing non-intrusive technologies, such as vibration analysis, oil analysis and I/R cameras, to an existing labor force and management team.

  2. 14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...

  3. 14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...

  4. 14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...

  5. 14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...

  6. 14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...

  7. 78 FR 49595 - Aviation Rulemaking Advisory Committee-New Task

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... the new ARAC activity and solicits membership for the Maintenance Reliability Program Working Group... establish the Maintenance Reliability Program Working Group. The working group will serve as staff to ARAC... programs. The Maintenance Reliability Program Working Group will provide advice and recommendations on the...

  8. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    ERIC Educational Resources Information Center

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  9. 40 CFR 52.379 - Control strategy: PM2.5.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Control strategy: PM2.5. 52.379 Section 52.379 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.379 Control strategy: PM2.5. Approval...

  10. CONTINUOUS AND SEMI-CONTINUOUS METHODS FOR PM MASS AND COMPOSITION

    EPA Science Inventory

    This article is a review of the status of continuous and semi-continuous methods for PM mass and composition based on results from EPA's PM Supersites Program and related studies. It summarizes recommendations suggested by Solomon and Sioutas (2006 submitted to the J. Air and Wa...

  11. 48 CFR 301.607-74 - Certification transfers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....607-74 Certification transfers. (a) HHS recognizes and accepts FAC-P/PM certifications issued by other... under FAC-P/PM. See FAI's Web site, and Chapter 3, Federal Acquisition Certification—Program and Project... certification transfer should not be initiated when an individual, who holds a current FAC-P/PM certification...

  12. 48 CFR 301.607-74 - Certification transfers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....607-74 Certification transfers. (a) HHS recognizes and accepts FAC-P/PM certifications issued by other... under FAC-P/PM. See FAI's Web site, and Chapter 3, Federal Acquisition Certification—Program and Project... certification transfer should not be initiated when an individual, who holds a current FAC-P/PM certification...

  13. 48 CFR 301.607-74 - Certification transfers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....607-74 Certification transfers. (a) HHS recognizes and accepts FAC-P/PM certifications issued by other... under FAC-P/PM. See FAI's Web site, and Chapter 3, Federal Acquisition Certification—Program and Project... certification transfer should not be initiated when an individual, who holds a current FAC-P/PM certification...

  14. 48 CFR 301.607-74 - Certification transfers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....607-74 Certification transfers. (a) HHS recognizes and accepts FAC-P/PM certifications issued by other... under FAC-P/PM. See FAI's Web site, and Chapter 3, Federal Acquisition Certification—Program and Project... certification transfer should not be initiated when an individual, who holds a current FAC-P/PM certification...

  15. 78 FR 54876 - Amended Notice of Intent To Modify the Scope of the Environmental Impact Statement and Conduct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... the operation of the U.S. electric power supply system under normal and contingency conditions), and... construction, operation, maintenance, and connection of the proposed new electric transmission line across the..., The Outback Pub at The Spa Restaurant, 869 Washington Street, Thursday, September 26, 2013, 5-8 p.m...

  16. Genetic analysis of salt tolerance in Arabidopsis: Evidence for the role of Ca(2+)/H(+) transporter CAX1

    USDA-ARS?s Scientific Manuscript database

    Coordinate regulation of transporters at both the plasma membrane and vacuole contribute to plant cell's ability to adapt to a changing environment and play a key role in the maintenance of the chemiosmotic circuits required for cellular growth. The plasma membrane (PM) Na+/H+ antiporter SOS1 is inv...

  17. 78 FR 54177 - Adequacy Status of the Submitted 2009, 2017 and 2025 PM2.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... criteria set forth by 40 CFR 93.118(e)(4), as follows: (i) The submitted control strategy implementation... strategy implementation plan or maintenance plan was submitted to EPA, consultation among federal, State... 2009, 2017 and 2025 budgets are less than the on-road mobile source inventory for 2007 that was shown...

  18. Maintenance program decision-making utilizing crash data.

    DOT National Transportation Integrated Search

    2013-07-01

    This document describes methods that may be used by UDOT Maintenance personnel to improve highway safety. Four programs have been recommended using crash data to make more informed decisions concerning maintenance programs as follows: : Snow & Ic...

  19. 76 FR 37134 - National Heart, Lung, and Blood Institute; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... Blood Institute Special Emphasis Panel, NHLBI Career Enhancement Grants for Stem Cell Research. Date..., Short Term Research Training Program. Date: July 20, 2011. Time: 1 p.m. to 4 p.m. Agenda: To review and... . (Catalogue of Federal Domestic Assistance Program Nos. 93.233, National Center for Sleep Disorders Research...

  20. 20 CFR 411.235 - What qualifications are required of a PM?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false What qualifications are required of a PM? 411.235 Section 411.235 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work...

  1. In Vivo Monitoring Program Manual, PNL-MA-574

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, Timothy P.

    2010-07-01

    An overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance. Overall responsibility for the management of the IVMP rests with the Program Manager (PM). The PM is responsible for providing the required in vivo counting services for Hanford Site contractor employees in accordance with Department of Energy (DOE) requirements and the specific statements of work.

  2. 41 CFR 102-34.275 - What kind of maintenance programs must we have?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What kind of maintenance programs must we have? 102-34.275 Section 102-34.275 Public Contracts and Property Management Federal... VEHICLE MANAGEMENT Scheduled Maintenance of Motor Vehicles § 102-34.275 What kind of maintenance programs...

  3. Generation of urban road dust from anti-skid and asphalt concrete aggregates.

    PubMed

    Tervahattu, Heikki; Kupiainen, Kaarle J; Räisänen, Mika; Mäkelä, Timo; Hillamo, Risto

    2006-04-30

    Road dust forms an important component of airborne particulate matter in urban areas. In many winter cities the use of anti-skid aggregates and studded tires enhance the generation of mineral particles. The abrasion particles dominate the PM10 during springtime when the material deposited in snow is resuspended. This paper summarizes the results from three test series performed in a test facility to assess the factors that affect the generation of abrasion components of road dust. Concentrations, mass size distribution and composition of the particles were studied. Over 90% of the particles were aluminosilicates from either anti-skid or asphalt concrete aggregates. Mineral particles were observed mainly in the PM10 fraction, the fine fraction being 12% and submicron size being 6% of PM10 mass. The PM10 concentrations increased as a function of the amount of anti-skid aggregate dispersed. The use of anti-skid aggregate increased substantially the amount of PM10 originated from the asphalt concrete. It was concluded that anti-skid aggregate grains contribute to pavement wear. The particle size distribution of the anti-skid aggregates had great impact on PM10 emissions which were additionally enhanced by studded tires, modal composition, and texture of anti-skid aggregates. The results emphasize the interaction of tires, anti-skid aggregate, and asphalt concrete pavement in the production of dust emissions. They all must be taken into account when measures to reduce road dust are considered. The winter maintenance and springtime cleaning must be performed properly with methods which are efficient in reducing PM10 dust.

  4. Diurnal alterations of brain electrical activity in healthy adults: a LORETA study.

    PubMed

    Toth, Marton; Kiss, Attila; Kosztolanyi, Peter; Kondakor, Istvan

    2007-01-01

    EEG background activity was investigated by low resolution brain electromagnetic tomography (LORETA) to test the diurnal alterations of brain electrical activity in healthy adults. Fourteen right-handed healthy male postgraduate medical students were examined four times (8 a.m., 2 p.m., 8 p.m. and next day 2 p.m.). LORETA was computed to localize generators of EEG frequency components. Comparing the EEG activity between 2 p.m. and 8 a.m., increased activity was seen (1) in theta band (6.5-8 Hz) in the left prefrontal, bilateral mesial frontal and anterior cingulate cortex; (2) in alpha2 band (10.5-12 Hz) in the bilateral precuneus and posterior parietal cortex as well as in the right temporo-occipital cortex; (3) in beta1-2-3 band (12.5-30 Hz) in the right hippocampus and parieto-occipital cortex, left frontal and bilateral cingulate cortex. Comparing the brain activity between 8 p.m. and 8 a.m., (1) midline theta activity disappeared; (2) increased alpha2 band activity was seen in the left hemisphere (including the left hippocampus); and (3) increased beta bands activity was found over almost the whole cortex (including both of hippocampi) with the exception of left temporo-occipital region. There were no significant changes between the background activities of 2 p.m. and next day 2 p.m. Characteristic distribution of increased activity of cortex (no change in delta band, and massive changes in the upper frequency bands) may mirror increasing activation of reticular formation and thus evoked thalamocortical feedback mechanisms as a sign of maintenance of arousal.

  5. Comparison of the cardiac electrophysiology and general toxicology of two formulations of intravenous amiodarone in dogs.

    PubMed

    Cushing, Daniel J; Cooper, Warren D; Gralinski, Michael R; Lipicky, Raymond J; Kudenchuk, Peter J; Kowey, Peter R

    2009-09-01

    Intravenous amiodarone (AIV) must be administered slowly after dilution to avoid hypotension, which is due to the cosolvents polysorbate 80 and benzyl alcohol used in its formulation. PM101 is a formulation of amiodarone devoid of these cosolvents, which enables bolus administration. We evaluated any potential toxicity or exaggerated adverse cardiac electrophysiologic effects of PM101 compared with AIV and control. Beagle dogs were treated with the human-equivalent amiodarone loading dose (2.14 mg/kg) with PM101 (bolus push) or AIV (10 min infusion in the toxicology study and bolus push in the electrophysiology study) followed by maintenance infusion (0.014 mg kg(-1) min(-1) through 6 h followed by 0.007 mg kg(-1) min(-1) through 14 days) or a control. General toxicology was assessed in conscious dogs over 14 days. Cardiac electrophysiology was assessed in a separate cohort of anesthetized dogs during the first 20 min of dosing. In the toxicology study, dosing in all animals in the AIV group was terminated within 17 min of initiation due to a severe hypersensitivity reaction. There were no acute adverse clinical signs in the PM101 or control groups. There were no significant effects on body weight or ECG parameters, and no adverse histomorphologic changes were seen in dogs that received PM101 or AIV. No significant exaggerated cardiac electrophysiologic effects of the approved doses PM101 or AIV were observed. PM101 may represent a formulation of intravenous amiodarone that could be administered rapidly without dilution in the setting of life-threatening cardiac arrhythmias.

  6. Influence of transboundary air pollutants from China on the high-PM10 episode in Seoul, Korea for the period October 16-20, 2008

    NASA Astrophysics Data System (ADS)

    Lee, Seungmin; Ho, Chang-Hoi; Lee, Yun Gon; Choi, Hyoung-Jin; Song, Chang-Keun

    2013-10-01

    This study examines the extraordinarily long-lasting episode of high concentrations of particulate matter with diameter <10 μm (PM10) in Seoul, Korea over the period October 16-20, 2008. The concentration of PM10 increased up to 197.2 μg m-3 and continually stayed above the daily environmental control standard value (100 μg m-3) for the period. Satellite retrievals from the Moderate Resolution Imaging Spectroradiometer (MODIS), Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) showed pronounced transport of aerosols from China to the Korean peninsula prior to the high-PM10 episode. The updraft of air pollutants from the source region in China, transport by westerlies, and subsequent descent to Seoul metropolitan regions are examined in the context of horizontal and vertical airflows. The connection between PM10 concentration over the Chinese source region and the Seoul target area is verified by wind back trajectory analysis. The meteorological conditions favorable for maintenance of the high PM10 levels are investigated through the analysis of weather maps and low-level stability. In this high-PM10 episode, the stagnant high-pressure system over Korea may play a decisive role in the descent and accumulation of air pollutants. The influence of transboundary air pollutants from China on the air quality in Korea and relevant meteorological environment found in the present study will provide a theoretical underpinning to potential cooperation between East Asian countries in monitoring and controlling atmospheric conditions.

  7. Paranal maintenance and CMMS experience

    NASA Astrophysics Data System (ADS)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  8. 75 FR 14428 - Mid-Atlantic Fishery Management Council (MAFMC); Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... Dogfish, Research Set- Aside (RSA), and Executive Committees will hold public meetings. DATES: Tuesday.... until 4 p.m.. From 4 p.m. until 5:30 p.m., the Research Set-Aside (RSA) will meet. On Wednesday, April... Amendment 3). The RSA Committee will discuss possible ways to improve the RSA program and consider...

  9. 77 FR 64734 - Approval and Promulgation of Implementation Plans; North Dakota: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Permitting Authority and Tailoring Rule; PM 2.5 NSR Implementation Rule AGENCY: Environmental Protection... Implementation Plan (SIP) relating to regulation of Greenhouse Gases (GHGs) and fine particulate matter (PM 2.5... Tailoring Final Rule'' and the final rule for ``Implementation of the New Source Review (NSR) Program for PM...

  10. U.S.-MEXICO BORDER PROGRAM ARIZONA BORDER STUDY--STANDARD OPERATING PROCEDURE FOR CALIBRATION OF HARVARD PM SAMPLERS (UA-L-6.1)

    EPA Science Inventory

    The purpose of this SOP is to describe the procedures for calibrating Harvard particulate matter (PM) samplers. This procedure applies directly to the Harvard particulate matter (PM) samplers used during the Arizona NHEXAS project and the Border study. Keywords: lab; equipment;...

  11. 40 CFR 52.331 - Committal SIP for the Colorado Group II PM10 areas.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PM10 areas. 52.331 Section 52.331 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.331 Committal SIP for the Colorado Group II PM10 areas. On April 14, 1989, the Governor submitted a Committal SIP...

  12. 40 CFR 52.331 - Committal SIP for the Colorado Group II PM10 areas.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PM10 areas. 52.331 Section 52.331 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.331 Committal SIP for the Colorado Group II PM10 areas. On April 14, 1989, the Governor submitted a Committal SIP...

  13. 40 CFR 52.331 - Committal SIP for the Colorado Group II PM10 areas.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PM10 areas. 52.331 Section 52.331 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.331 Committal SIP for the Colorado Group II PM10 areas. On April 14, 1989, the Governor submitted a Committal SIP...

  14. 40 CFR 52.331 - Committal SIP for the Colorado Group II PM10 areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PM10 areas. 52.331 Section 52.331 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.331 Committal SIP for the Colorado Group II PM10 areas. On April 14, 1989, the Governor submitted a Committal SIP...

  15. 40 CFR 52.331 - Committal SIP for the Colorado Group II PM10 areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PM10 areas. 52.331 Section 52.331 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.331 Committal SIP for the Colorado Group II PM10 areas. On April 14, 1989, the Governor submitted a Committal SIP...

  16. Evaluating Psychiatry Residents as Physician-Managers: Development of an Assessment Tool

    ERIC Educational Resources Information Center

    Sockalingam, Sanjeev; Stergiopoulos, Vicky; Maggi, Julie D.; Zaretsky, Ari; Stovel, Laura; Hodges, Brian

    2013-01-01

    Objectives: With the emergence of physician-manager (PM) curricula in medical education, more effective assessment tools are needed to evaluate psychiatry trainees in this role. The aim of this study was to determine psychiatry residents', program directors', and PM educators' perceptions about PM role-assessment. Methods: Psychiatry residents at…

  17. CHARACTERIZATION OF PM-10 EMISSIONS FROM ANTISKID MATERIALS APPLIED TO ICE- AND SNOW-COVERED ROADWAYS

    EPA Science Inventory

    The report gives results of a field program to establish a predictive model for PM-10 (particulate matter with diameters or < 10 micrometers) emission. NOTE: Several areas of the U.S. in violation of the National Ambient Air Quality Standard for PM-10 have conducted studies that ...

  18. 40 CFR 52.634 - Particulate matter (PM-10) Group III SIP.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.634 Particulate matter (PM-10) Group III SIP. (a) On September 14, 1988, the Governor of Hawaii submitted a revision to the... necessary to satisfy the requirements of the PM-10 Group III SIP. (b) The Hawaii Department of Health has...

  19. Game-Theoretic Models for Usage-based Maintenance Contract

    NASA Astrophysics Data System (ADS)

    Husniah, H.; Wangsaputra, R.; Cakravastia, A.; Iskandar, B. P.

    2018-03-01

    A usage-based maintenance contracts with coordination and non coordination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers service contract to the owner of the truck after warranty ends. This contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the owner will be charged an additional cost. In general, the agent (Original Equipment Manufacturer/OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. The decision problem for the owner is to select the best option offered that fits to its requirement, and the decision problem for the agent is to find the optimal maintenance efforts for a given price of the service option offered. We first find the optimal decisions using coordination scheme and then with non coordination scheme for both parties.

  20. 20 CFR 411.245 - What are a PM's responsibilities under the Ticket to Work program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false What are a PM's responsibilities under the Ticket to Work program? 411.245 Section 411.245 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE... formats. For purposes of this section, accessible format means by media that is appropriate to a...

  1. 20 CFR 411.245 - What are a PM's responsibilities under the Ticket to Work program?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false What are a PM's responsibilities under the Ticket to Work program? 411.245 Section 411.245 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE... formats. For purposes of this section, accessible format means by media that is appropriate to a...

  2. 20 CFR 411.245 - What are a PM's responsibilities under the Ticket to Work program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false What are a PM's responsibilities under the Ticket to Work program? 411.245 Section 411.245 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE... formats. For purposes of this section, accessible format means by media that is appropriate to a...

  3. 20 CFR 411.245 - What are a PM's responsibilities under the Ticket to Work program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false What are a PM's responsibilities under the Ticket to Work program? 411.245 Section 411.245 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE... formats. For purposes of this section, accessible format means by media that is appropriate to a...

  4. 20 CFR 411.245 - What are a PM's responsibilities under the Ticket to Work program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false What are a PM's responsibilities under the Ticket to Work program? 411.245 Section 411.245 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE... formats. For purposes of this section, accessible format means by media that is appropriate to a...

  5. Maintenance manager's manual for small transit agencies. Special report 1985-1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fowler, W.

    1988-03-01

    This publication contains information to assist operators of transit agencies providing public transportation in rural and smaller urban areas to better manage their vehicle maintenance programs. The report includes discussions of maintenance management, maintenance programs preventive maintenance, recordkeeping, selection of type of maintenance operation, in-house maintenance, and maintenance practices. Also included are appendixes giving supplementary information about tire loads; lubrication oil; mechanic hand tools; shop tools; mechanic aptitude tests; technical training resources; maintenance management training resources; and lists of manufacturers of air-conditioning systems, wheelchair lifts and wheelchair ramps.

  6. International Space Station (ISS) External Thermal Control System (ETCS) Loop A Pump Module (PM) Jettison Options Assessment

    NASA Technical Reports Server (NTRS)

    Murri, Daniel G.; Dwyer Cianciolo, Alicia; Shidner, Jeremy D.; Powell, Richard W.

    2014-01-01

    On December 11, 2013, the International Space Station (ISS) experienced a failure of the External Thermal Control System (ETCS) Loop A Pump Module (PM). To minimize the number of extravehicular activities (EVA) required to replace the PM, jettisoning the faulty pump was evaluated. The objective of this study was to independently evaluate the jettison options considered by the ISS Trajectory Operations Officer (TOPO) and to provide recommendations for safe jettison of the ETCS Loop A PM. The simulation selected to evaluate the TOPO options was the NASA Engineering and Safety Center's (NESC) version of Program to Optimize Simulated Trajectories II (POST2) developed to support another NESC assessment. The objective of the jettison analysis was twofold: (1) to independently verify TOPO posigrade and retrograde jettison results, and (2) to determine jettison guidelines based on additional sensitivity, trade study, and Monte Carlo (MC) analysis that would prevent PM recontact. Recontact in this study designates a propagated PM trajectory that comes within 500 m of the ISS propagated trajectory. An additional simulation using Systems Tool Kit (STK) was run for independent verification of the POST2 simulation results. Ultimately, the ISS Program removed the PM jettison option from consideration. However, prior to the Program decision, the retrograde jettison option remained part of the EVA contingency plan. The jettison analysis presented showed that, in addition to separation velocity/direction and the atmosphere conditions, the key variables in determining the time to recontact the ISS is highly dependent on the ballistic number (BN) difference between the object being jettisoned and the ISS.

  7. Deferred Maintenance Program Handbook.

    ERIC Educational Resources Information Center

    California State Dept. of General Services, Sacramento. Office of Public School Construction.

    This handbook provides process information on California's Deferred Maintenance Program, including a description of the administering body of law. Chapters discuss the program's process on the topics of basic/additional apportionment, fund release (basic/additional and critical hardship), the Deferred Maintenance Five-Year Plan, district deposit,…

  8. 77 FR 72287 - Approval and Promulgation of Implementation Plans; Florida; 110(a)(2)(D)(i)(II) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ....gov Web site is an ``anonymous access'' system, which means EPA will not know your identity or contact... inventories, monitoring, and modeling to assure attainment and maintenance of the NAAQS. States were required... infrastructure elements for the 1997 PM 2.5 NAAQS by October 3, 2008. On July 6, 2011, WildEarth Guardians and...

  9. 77 FR 34306 - Approval and Promulgation of Implementation Plans; Tennessee; 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ...'' system, which means EPA will not know your identity or contact information unless you provide it in the..., including emissions inventories, monitoring, and modeling to assure attainment and maintenance of the NAAQS... elements for the 1997 PM 2.5 NAAQS by October 3, 2008. On July 6, 2011, WildEarth Guardians and Sierra Club...

  10. 76 FR 19661 - Response to Petition From New Jersey Regarding SO2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... will be needed in certain States to address PM 2.5 nonattainment and maintenance problems in other States. See 75 FR 45129-21 (discussing the air quality problems and the specific NAAQS addressed by the... North Carolina v. EPA, 531 F.3d 896, modified on reh'g, 550 F.3d 1176 (DC Cir. 2006). The problems...

  11. 77 FR 21512 - Approval, Disapproval and Promulgation of Air Quality Implementation Plan; Utah; Maintenance Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... possible, you contact the individual listed in the FOR FURTHER INFORMATION CONTACT section to view the hard copy of the docket. You may view the hard copy of the docket Monday through Friday, 8 a.m. to 4 p.m... your concerns, and suggest alternatives. g. Explain your views as clearly as possible, avoiding the use...

  12. Suppression of progesterone synthesis in human trophoblast cells by fine particulate matter primarily derived from industry.

    PubMed

    Wang, Cui; Yang, Jinhuan; Hao, Zhengliang; Gong, Chenxue; Tang, Lihua; Xu, Yingling; Lu, Dezhao; Li, Zhuoyu; Zhao, Meirong

    2017-12-01

    Epidemiological studies have exhibited a positive association between fine particulate matter (PM 2.5 ) exposure and adverse pregnancy outcome (APO). However, source-related effect and the potential mechanism have not been thoroughly elucidated in toxicology. In this study, PM 2.5 was collected during a severe winter haze episode in an energy-base city of China. We coupled this approach with the source appointment by applying the Lagrangian Integrated Trajectory and Concentration Weighted Trajectory model. We observed that the primary trajectory with high polluted air mass came from the northwest of the sampling site. Approximately 90% or more of PM 2.5 was derived from the industry at this haze period. Next, the sampled PM 2.5 was used to study the classical hormone synthesis pathway on trophoblast JEG-3 cells. PM 2.5 induced the secretion of human chorionic gonadotrophin (HCG) and the proliferation of JEG-3 cells at a noncytotoxic concentration. However, the synthesis of progesterone was significantly suppressed, even if both hCG and cyclic adenosine monophosphate (cAMP) were increased, suggesting that PM 2.5 may interfere the downstream of cAMP. As expected, the phosphorylated activity of protein kinase A (PKA) was attenuated. Subsequently, the downstream molecules of steroidogenesis, such as ferredoxin reductase (FDXR), CYP11A1 (encoded P450scc), and 3β-Hydroxysteroid dehydrogenase type 1 (3β-HSD1), were inhibited. Therefore, PM 2.5, primarily derived from industry, may directly inhibit the phosphorylation status of PKA in JEG-3 which, in turn, inhibited the proteins expression in progesterone-synthesis to suppress progesterone levels. Considering the pivotal role of progesterone in pregnancy maintenance, the mechanism on hormone synthesis may provide a better understanding for PM 2.5 -caused APO. Industry-emanated PM 2.5 , though not specific, could threaten the placenta, which needs to be verified by further epidemiological studies. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. User Delay Cost Model and Facilities Maintenance Cost Model for a Terminal Control Area : Volume 3. User's Manual and Program Documentation for the Facilities Maintenance Cost Model

    DOT National Transportation Integrated Search

    1978-05-01

    The Facilities Maintenance Cost Model (FMCM) is an analytic model designed to calculate expected annual labor costs of maintenance within a given FAA maintenance sector. The model is programmed in FORTRAN IV and has been demonstrated on the CDC Krono...

  14. How to Get a Maintenance Program Underway

    ERIC Educational Resources Information Center

    Lundy, Lyndall L.

    1975-01-01

    The article describes the development of a comprehensive maintenance program for the school shop. A general maintenance management outline provides direction for planning, execution, and evaluation. (MW)

  15. 2016 Energetic Materials Gordon Research Conference and Gordon Research Seminar Research Area 7: Chemical Sciences 7.0 Chemical Sciences (Dr. James K. Parker)

    DTIC Science & Technology

    2016-08-10

    thermal decomposition and mechanical damage of energetics. The program for the meeting included nine oral presentation sessions. Discussion leaders...USA) 7:30 pm - 7:35 pm Introduction by Discussion Leader 7:35 pm - 7:50 pm Vincent Baijot (Laboratory for Analysis and Architecture of Systems , CNRS...were synthesis of new materials, performance, advanced diagnostics, experimental techniques, theoretical approaches, and computational models for

  16. Dipole Models for UXO Discrimination at Live Sites - Pole Mountain

    DTIC Science & Technology

    2012-06-01

    48 ESTCP MR-201159 Pole Mountain Demonstration Report viii April 2012 Acronyms API Application Programming...working on transitioning our inversion algorithms to an API that will be generally accessible. 8 3. PERFORMANCE OBJECTIVES The performance...2098 35 0 0 Frag (light) 6 MD PM-2098 35 0 0 Frag (light) 4 MD PM-2098 35 0 0 Frag (light) 3.5 MD PM-1354 8.5 0 0 Frag (medium) 5 MD PM- 1104 3 15

  17. Effects of a Stretching Development and Maintenance Program on Hamstring Extensibility in Schoolchildren: A Cluster-Randomized Controlled Trial

    PubMed Central

    Mayorga-Vega, Daniel; Merino-Marban, Rafael; Manzano-Lagunas, Jorge; Blanco, Humberto; Viciana, Jesús

    2016-01-01

    The main purpose of the present study was to examine the effects of a physical education-based stretching development and maintenance program on hamstring extensibility in schoolchildren. A sample of 150 schoolchildren aged 7-10 years old from a primary school participated in the present study (140 participants were finally included). The six classes balanced by grade were cluster randomly assigned to the experimental group 1 (n = 51), experimental group 2 (n = 51) or control group (n = 49) (i.e., a cluster randomized controlled trial design was used). During the physical education classes, the students from the experimental groups 1 and 2 performed a four-minute stretching program twice a week for nine weeks (first semester). Then, after a five-week period of detraining coinciding with the Christmas holidays, the students from the experimental groups 1 and 2 completed another stretching program twice a week for eleven weeks (second semester). The students from the experimental group 1 continued performing the stretching program for four minutes while those from the experimental group 2 completed a flexibility maintenance program for only one minute. The results of the two-way analysis of variance showed that the physical education-based stretching development program significantly improved the students’ hamstring extensibility (p < 0.001), as well as that these gains obtained remained after the stretching maintenance program (p < 0.001). Additionally, statistically significant differences between the two experimental groups were not found (p > 0.05). After a short-term stretching development program, a physical education-based stretching maintenance program of only one-minute sessions twice a week is effective in maintaining hamstring extensibility among schoolchildren. This knowledge could help and guide teachers to design programs that allow a feasible and effective development and maintenance of students’ flexibility in the physical education setting. Key points A physical education-based stretching maintenance program of only one-minute sessions twice a week is effective in maintaining hamstring extensibility among schoolchildren. A four-minute maintenance program shows similar effects that the one-minute maintenance program on hamstring extensibility among schoolchildren. Physical education teachers and other practitioners could carry out one-minute programs for a feasible and effective maintenance of students’ flexibility. PMID:26957928

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grewal, Jaspreet S.; McLuskey, Karen; Das, Debanu

    The structure of a C11 peptidase PmC11 from the gut bacterium, Parabacteroides merdae, has recently been determined, enabling the identification and characterization of a C11 orthologue, PNT1, in the parasitic protozoon Trypanosoma brucei. A phylogenetic analysis identified PmC11 orthologues in bacteria, archaea, Chromerids, Coccidia, and Kinetoplastida, the latter being the most divergent. A primary sequence alignment of PNT1 with clostripain and PmC11 revealed the position of the characteristic His-Cys catalytic dyad (His 99 and Cys 136), and an Asp (Asp 134) in the potential S 1 binding site. Immunofluorescence and cryoelectron microscopy revealed that PNT1 localizes to the kinetoplast, anmore » organelle containing the mitochondrial genome of the parasite (kDNA), with an accumulation of the protein at or near the antipodal sites. Depletion of PNT1 by RNAi in the T. brucei bloodstream form was lethal both in in vitro culture and in vivo in mice and the induced population accumulated cells lacking a kinetoplast. In contrast, overexpression of PNT1 led to cells having mislocated kinetoplasts. RNAi depletion of PNT1 in a kDNA independent cell line resulted in kinetoplast loss but was viable, indicating that PNT1 is required exclusively for kinetoplast maintenance. Expression of a recoded wild-type PNT1 allele, but not of an active site mutant restored parasite viability after induction in vitro and in vivo confirming that the peptidase activity of PNT1 is essential for parasite survival. Furthermore, these data provide evidence that PNT1 is a cysteine peptidase that is required exclusively for maintenance of the trypanosome kinetoplast.« less

  19. “It doesn’t seem to make sense for a company that sells cigarettes to help smokers stop using them”: A case study of Philip Morris’s involvement in smoking cessation

    PubMed Central

    Lown, E. Anne; Malone, Ruth E.

    2017-01-01

    Background In the late 1990s, American tobacco companies began offering limited cessation assistance to smokers by posting links on their company websites to government-sponsored smoking cessation resources. Philip Morris USA (PM) went further, funding youth cessation programs and creating its own online cessation program, QuitAssist. We explore why PM entered the cessation arena, and describe the variety of options considered and how PM-supported cessation programs were evaluated and promoted. Methods We retrieved and analyzed archival PM documents from 1998–2005. We supplemented information from the documents with scholarly articles assessing QuitAssist and archived versions of the PM and QuitAssist websites. Results PM’s Youth Smoking Prevention department began funding youth cessation projects and programs soon after its creation in 1998, motivated by the same issue that drove its interest in youth smoking prevention: regulatory threats posed by public and policymaker concern about youth smoking. The department took a similar approach to youth smoking cessation as it did with prevention, rejecting curricula with “anti-industry” themes. In 2002, a “cessation exploration team” examined a variety of rationales for and approaches to company support for adult smoking cessation. Ultimately, PM chose QuitAssist, a limited and less expensive option that nonetheless provided opportunities for engagement with a variety of public health and government officials. Independent research indicates that QuitAssist is not an effective cessation tool. Conclusions While the transformation of ambitious plans into a mundane final product is a recurring theme with PM’s corporate responsibility efforts, it would be inappropriate to dismiss PM’s smoking cessation endeavors as half-hearted attempts to appear responsible. Such endeavors have the potential to inflict real harm by competing with more effective programs and by helping to maintain a tobacco-favorable policy environment. If PM truly wanted to support cessation, it could drop legal and other challenges to public policies that discourage smoking. PMID:28846738

  20. U.S.-MEXICO BORDER PROGRAM ARIZONA BORDER STUDY--STANDARD OPERATING PROCEDURE FOR HARVARD PM IMPACTOR CALIBRATION AND LEAK TESTING (UA-L-7.1)

    EPA Science Inventory

    The purpose of this SOP is to describe the procedures for the periodic calibration and leak testing of Harvard particulate matter (PM) impactor units. This procedure applies directly to the calibration and leak testing of Harvard PM impactor units used during the Arizona NHEXAS ...

  1. Maintenance Research. Report 6. Maintenance Training.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Highways, Baton Rouge.

    The main objective of the training research phase of the maintenance management study was to develop and test training methods suitable for highway maintenance supervisors. Supervisors were trained by one of five different methods (lecture, group discussion, programed instruction, programed workshops, audiovisual instruction). The report documents…

  2. EPA AirNow Satellite Data Processor (ASDP) for Improving Air Quality Information

    NASA Astrophysics Data System (ADS)

    White, J. E.; Dickerson, P.; Szykman, J.; Chu, D.; Kondragunta, S.; Zhang, H.; Martin, R. V.; van Donkelaar, A.; Pasch, A. N.; Dye, T. S.; Zahn, P. H.; Haderman, M. D.; DeWinter, J. L.

    2012-12-01

    The US Environmental Protection Agency (EPA) AirNow program provides Air Quality Index (AQI) information to the public, decision-makers, researchers and the media (data and forecasts) mainly for ozone and PM2.5 (particles smaller than 2.5 μm in median diameter). EPA wants to provide the best information available to the public and integrating NASA satellite-derived surface PM2.5 concentrations with ground-level PM2.5 observations has proved promising. The AirNow Satellite Data Processor (ASDP) uses daily PM2.5 estimates and uncertainties derived from average Aqua and Terra MODerate resolution Imaging Spectrometer (MODIS) AOD in near-real-time over the United States and fuses the results with observed PM2.5 measurements to create several air quality products for evaluation. In addition to the description of the AirNow program and the AirNow ASDP, several case studies will be presented to show the value that NASA satellite information adds to maps of air quality.

  3. A Conceptual Model for Training After-School Program Staffers to Promote Physical Activity and Nutrition

    ERIC Educational Resources Information Center

    Weaver, Robert Glenn; Beets, Michael W.; Webster, Collin; Beighle, Aaron; Huberty, Jennifer

    2012-01-01

    Background: After-school programs (ASPs, 3 pm to 6 pm) have been called upon to increase the amount of daily physical activity children accumulate and improve the nutritional quality of the snacks served. To this end, state and national physical activity and nutrition (PAaN) policies have been proposed. Frontline staff who directly interact with…

  4. Protecting You/Protecting Me: Effects of an Alcohol Prevention and Vehicle Safety Program on Elementary Students

    ERIC Educational Resources Information Center

    Bell, Mary Lou; Kelley-Baker, Tara; Rider, Raamses; Ringwalt, Christopher

    2005-01-01

    This paper describes an evaluation of Protecting You/Protecting Me (PY/PM), a classroom-based, alcohol-use prevention and vehicle safety program for elementary students in first through fifth grades developed by Mothers Against Drunk Driving. PY/PM lessons and activities focus on teaching children about (1) their brains (why their brain is…

  5. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  6. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  7. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  8. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  9. Youth Afterschool Programs and the Role of Law Enforcement. NIJ Research in Progress [videotape].

    ERIC Educational Resources Information Center

    Chaiken, Marcia

    Recent findings show that children and teens are most vulnerable either to committing or being a victim of crime between 2:30 p.m. and 8:30 p.m. Community organizations with afterschool programs are particularly well positioned to counter some of the hazards that threaten children, especially urban adolescents: drug abuse, gang activity, and…

  10. A pilot study comparing two weight loss maintenance interventions among low-income, mid-life women.

    PubMed

    Samuel-Hodge, Carmen D; Johnston, Larry F; Gizlice, Ziya; Garcia, Beverly A; Lindsley, Sara C; Gold, Alison D; Braxton, Danielle F; Keyserling, Thomas C

    2013-07-15

    Despite high obesity prevalence rates, few low-income midlife women participate in weight loss maintenance trials. This pilot study aims to assess the effectiveness of two weight loss maintenance interventions in this under-represented population. Low-income midlife women who completed a 16-week weight loss intervention and lost  ≥ 8 lbs (3.6 kg) were eligible to enroll in one of two 12-month maintenance programs. The programs were similar in content and had the same number of total contacts, but were different in the contact modality (Phone + Face-to-Face vs. Face-to-Face Only). Two criteria were used to assess successful weight loss maintenance at 12 months: (1) retaining a loss of  ≥ 5% of body weight from the start of the weight loss phase and (2) a change in body weight of  < 3%, from the start to the end of the maintenance program. Outcome measures of changes in physiologic and psychosocial factors, and evaluations of process measures and program acceptability (measured at 12 months) are also reported. For categorical variables, likelihood ratio or Fisher's Exact (for small samples) tests were used to evaluate statistically significant relationships; for continuous variables, t-tests or their equivalents were used to assess differences between means and also to identify correlates of weight loss maintenance. Overall, during the 12-month maintenance period, 41% (24/58) of participants maintained a loss of  ≥ 5% of initial weight and 43% (25/58) had a <3% change in weight. None of the comparisons between the two maintenance programs were statistically significant. However, improvements in blood pressure and dietary behaviors remained significant at the end of the 12-month maintenance period for participants in both programs. Participant attendance and acceptability were high for both programs. The effectiveness of two pilot 12-month maintenance interventions provides support for further research in weight loss maintenance among high-risk, low-income women. ClinicalTrials.gov Identifier: NCT00288301.

  11. Toward full life cycle control: Adding maintenance measurement to the SEL

    NASA Technical Reports Server (NTRS)

    Rombach, H. Dieter; Ulery, Bradford T.; Valett, Jon D.

    1992-01-01

    Organization-wide measurement of software products and processes is needed to establish full life cycle control over software products. The Software Engineering Laboratory (SEL)--a joint venture between NASA GSFC, the University of Maryland, and Computer Sciences Corporation--started measurement of software development more than 15 years ago. Recently, the measurement of maintenance was added to the scope of the SEL. In this article, the maintenance measurement program is presented as an addition to the already existing and well-established SEL development measurement program and evaluated in terms of its immediate benefits and long-term improvement potential. Immediate benefits of this program for the SEL include an increased understanding of the maintenance domain, the differences and commonalities between development and maintenance, and the cause-effect relationships between development and maintenance. Initial results from a sample maintenance study are presented to substantiate these benefits. The long-term potential of this program includes the use of maintenance baselines to better plan and manage future projects and to improve development and maintenance practices for future projects wherever warranted.

  12. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...

  13. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...

  14. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...

  15. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...

  16. 7 CFR 772.5 - Security maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Security maintenance. 772.5 Section 772.5 Agriculture... SPECIAL PROGRAMS SERVICING MINOR PROGRAM LOANS § 772.5 Security maintenance. (a) General. Borrowers are responsible for maintaining the collateral that is serving as security for their Minor Program loan in...

  17. 7 CFR 772.5 - Security maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 7 2012-01-01 2012-01-01 false Security maintenance. 772.5 Section 772.5 Agriculture... SPECIAL PROGRAMS SERVICING MINOR PROGRAM LOANS § 772.5 Security maintenance. (a) General. Borrowers are responsible for maintaining the collateral that is serving as security for their Minor Program loan in...

  18. Experimental studies about the impact of traction sand on urban road dust composition.

    PubMed

    Kupiainen, Kaarle; Tervahattu, Heikki; Räisänen, Mika

    2003-06-01

    Traffic causes enhanced PM(10) resuspension especially during spring in the US, Japan, Norway, Sweden and Finland, among other countries. The springtime PM(10) consists primarily of mineral matter from tyre-induced paved road surface wear and traction sand. In some countries, the majority of vehicles are equipped with studded tyres to enhance traction, which additionally increases road surface wear. Because the traction sand and the mineral matter from the pavement aggregate can have a similar mineralogical composition, it has been difficult to determine the source of the mineral fraction in the PM(10). In this study, homogenous traction sand and pavement aggregate with different mineralogical compositions were chosen to determine the sources of PM(10) particles by single particle analysis (SEM/EDX). This study was conducted in a test facility, which made it possible to rule out dust contributions from other sources. The ambient PM(10) concentrations were higher when traction sand was used, regardless of whether the tyres were studded or not. Surprisingly, the use of traction sand greatly increased the number of the particles originating from the pavement. It was concluded that sand must contribute to pavement wear. This phenomenon is called the sandpaper effect. An understanding of this is important to reduce harmful effects of springtime road dust in practical winter maintenance of urban roads

  19. Interactions between lipids and proteins are critical for organization of plasma membrane-ordered domains in tobacco BY-2 cells.

    PubMed

    Grosjean, Kevin; Der, Christophe; Robert, Franck; Thomas, Dominique; Mongrand, Sébastien; Simon-Plas, Françoise; Gerbeau-Pissot, Patricia

    2018-06-27

    The laterally heterogeneous plant plasma membrane (PM) is organized into finely controlled specialized areas that include membrane-ordered domains. Recently, the spatial distribution of such domains within the PM has been identified as playing a key role in cell responses to environmental challenges. To examine membrane order at a local level, BY-2 tobacco suspension cell PMs were labelled with an environment-sensitive probe (di-4-ANEPPDHQ). Four experimental models were compared to identify mechanisms and cell components involved in short-term (1 h) maintenance of the ordered domain organization in steady-state cell PMs: modulation of the cytoskeleton or the cell wall integrity of tobacco BY-2 cells; and formation of giant vesicles using either a lipid mixture of tobacco BY-2 cell PMs or the original lipid and protein combinations of the tobacco BY-2 cell PM. Whilst inhibiting phosphorylation or disrupting either the cytoskeleton or the cell wall had no observable effects, we found that lipids and proteins significantly modified both the abundance and spatial distribution of ordered domains. This indicates the involvement of intrinsic membrane components in the local physical state of the plant PM. Our findings support a major role for the 'lipid raft' model, defined as the sterol-dependent ordered assemblies of specific lipids and proteins in plant PM organization.

  20. Insights into PM10 sources in Houston, Texas: Role of petroleum refineries in enriching lanthanoid metals during episodic emission events

    NASA Astrophysics Data System (ADS)

    Bozlaker, Ayşe; Buzcu-Güven, Birnur; Fraser, Matthew P.; Chellam, Shankararaman

    2013-04-01

    Petroleum refineries may emit large quantities of pollutants during non-routine operations that include start-ups and shutdowns, planned maintenance, and unplanned equipment failures. The Texas Commission on Environmental Quality (TCEQ) tracks such events by requiring industries to self-report estimates of these emissions because they often have a detrimental impact on local air quality and potentially, public health. An inventory of non-routine episodic emission events is available via TCEQ's website. However, there is on-going concern that such episodic emissions are sometimes under-reported or even not cataloged. Herein, we present concentrations of 42 main group, transition, and lanthanoid elements in 114 time-resolved (3 or 6 h) samples collected over a 1-month period. We also develop strategies to identify aerosol sources using elemental tracers and compare source apportionment (performed by positive matrix factorization) based on ambient measurements to inventoried non-routine emission events. Through interpretation of key marker elements, five sources impacting concentrations of metals in PM10 were identified and calculated to contribute 73% of the measured PM10 mass. On average, primary emissions from fluidized-bed catalytic cracking (FCC) units negligibly contributed to apportioned PM10 mass. However, 35 samples were identified as impacted by transient PM10 emissions from FCC units because of elevated levels of lanthanoid metals and their ratios. Only 31 of these 35 samples coincided with self-reported non-routine emission events. Further, roughly half of the emission event self-reports detailed only emissions of gaseous pollutants. Based on this, we posit that not all PM10 emission events are reported and even self-reported emission events are incomplete - those that only catalog gaseous pollutants may also include unreported PM emissions.

  1. Chimney stoves modestly improved indoor air quality measurements compared with traditional open fire stoves: results from a small-scale intervention study in rural Peru.

    PubMed

    Hartinger, S M; Commodore, A A; Hattendorf, J; Lanata, C F; Gil, A I; Verastegui, H; Aguilar-Villalobos, M; Mäusezahl, D; Naeher, L P

    2013-08-01

    Nearly half of the world's population depends on biomass fuels to meet domestic energy needs, producing high levels of pollutants responsible for substantial morbidity and mortality. We compare carbon monoxide (CO) and particulate matter (PM2.5) exposures and kitchen concentrations in households with study-promoted intervention (OPTIMA-improved stoves and control stoves) in San Marcos Province, Cajamarca Region, Peru. We determined 48-h indoor air concentration levels of CO and PM2.5 in 93 kitchen environments and personal exposure, after OPTIMA-improved stoves had been installed for an average of 7 months. PM2.5 and CO measurements did not differ significantly between OPTIMA-improved stoves and control stoves. Although not statistically significant, a post hoc stratification of OPTIMA-improved stoves by level of performance revealed mean PM2.5 and CO levels of fully functional OPTIMA-improved stoves were 28% lower (n = 20, PM2.5, 136 μg/m(3) 95% CI 54-217) and 45% lower (n = 25, CO, 3.2 ppm, 95% CI 1.5-4.9) in the kitchen environment compared with the control stoves (n = 34, PM2.5, 189 μg/m(3), 95% CI 116-261; n = 44, CO, 5.8 ppm, 95% CI 3.3-8.2). Likewise, although not statistically significant, personal exposures for OPTIMA-improved stoves were 43% and 17% lower for PM2.5 (n = 23) and CO (n = 25), respectively. Stove maintenance and functionality level are factors worthy of consideration for future evaluations of stove interventions. © 2013 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  2. Chimney stoves modestly improved indoor air quality measurements compared with traditional open fire stoves: results from a small-scale intervention study in rural Peru

    PubMed Central

    Hartinger, S.M.; Commodore, A.A.; Hattendorf, J.; Lanata, C.F.; Gil, A.I.; Verastegui, H.; Aguilar-Villalobos, M.; Mäusezahl, D.; Naeher, L.P.

    2015-01-01

    Nearly half of the world’s population depends on biomass fuels to meet domestic energy needs, producing high levels of pollutants responsible for substantial morbidity and mortality. We compare carbon monoxide (CO) and particulate matter (PM2.5) exposures and kitchen concentrations in households with study promoted intervention (OPTIMA-improved) stoves and control stoves in San Marcos Province, Cajamarca Region, Peru. We determined 48hr indoor air concentration levels of CO and PM2.5 in 93 kitchen environments and personal exposure, after OPTIMA-improved stoves had been installed for an average of seven months. PM2.5 and CO measurements did not differ significantly between OPTIMA-improved stoves and control stoves. Although not statistically significant, a post-hoc stratification of OPTIMA-improved stoves by level of performance revealed mean PM2.5 and CO levels of fully functional OPTIMA-improved stoves were 28% lower (n=20, PM2.5, 136μg/m3 95%CI 54–217) and 45% lower (n=25, CO, 3.2ppm, 95%CI 1.5–4.9) in the kitchen environment compared to the control stoves (n=34, PM2.5, 189μg/m3, 95%CI 116–261; n=44, CO, 5.8ppm, 95%CI 3.3–8-2). Likewise, although not statistically significant, personal exposures for OPTIMA-improved stoves were 43% and 167% lower for PM2.5 (n=23) and CO (n=25) respectively. Stove maintenance and functionality level are factors worthy of consideration for future evaluations of stove interventions. PMID:23311877

  3. 78 FR 44494 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ...EPA is proposing to approve, as a revision of the California state implementation plan, the State's request to redesignate the Sacramento nonattainment area to attainment for the 24-hour particulate matter of ten microns or less (PM10) National Ambient Air Quality Standard (NAAQS). EPA is also proposing to approve the PM10 maintenance plan and the associated motor vehicle emissions budgets for use in transportation conformity determinations necessary for the Sacramento area. Finally, EPA is proposing to approve the attainment year emissions inventory. EPA is proposing these actions because the SIP revision meets the requirements of the Clean Air Act and EPA guidance for such plans and motor vehicle emissions budgets.

  4. The Trajectory of Language Policy: The First Language Maintenance and Development Program in South Australia

    ERIC Educational Resources Information Center

    Liddicoat, Anthony J.; Curnow, Timothy Jowan; Scarino, Angela

    2016-01-01

    This paper examines the development of the First Language Maintenance and Development (FLMD) program in South Australia. This program is the main language policy activity that specifically focuses on language maintenance in government primary schools and has existed since 1986. During this time, the program has evolved largely as the result of ad…

  5. The National Shipbuilding Research Program. Short Course on Implementing Advanced Technology. Course Notes

    DTIC Science & Technology

    1996-01-01

    12.30PM LUNCH 12.30-1.00 PM EXERCISE - U.S. VERSUS FOREIGN COST BREAKDOWN 1.00-1.30 PM THE CANDY STORE - TOTAL QUALITY MANAGEMENT 1.30-2000 PM SEAMLESS...AVONDALE’S RUSSIAN TANKER, AND BENDER’S REEFER SHIP PROJECTS ALL APPEAR DEAD OTHER U.S. SHIPBUILDERS ARE STILL IN NEGOTIATION WITH POTENTIAL FOREIGN AND...derived: Direct ManhourdCGT Total Employee Manhours/CGT CGT/ Direct worker Year CGT/Total Employee Year 2 3 NATIONAL RESEARCH COUNCIL DESIGN AND

  6. Industrial Machinery Maintenance and Repair. Florida Vocational Program Guide.

    ERIC Educational Resources Information Center

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This vocational program guide is intended to assist in the organization, operation, and evaluation of a program in industrial machinery maintenance and repair in school districts, area vocational centers, and community colleges. The following topics are covered: job duties of millwrights, maintenance mechanics, and machinery erectors; program…

  7. An Interactive Computer-Based Training Program for Beginner Personal Computer Maintenance.

    ERIC Educational Resources Information Center

    Summers, Valerie Brooke

    A computer-assisted instructional program, which was developed for teaching beginning computer maintenance to employees of Unisys, covered external hardware maintenance, proper diskette care, making software backups, and electro-static discharge prevention. The procedure used in developing the program was based upon the Dick and Carey (1985) model…

  8. Residential indoor PM2.5 in wood stove homes: follow-up of the Libby changeout program

    PubMed Central

    Noonan, Curtis W.; Navidi, William; Sheppard, Lianne; Palmer, Christopher P.; Bergauff, Megan; Hooper, Kathi; Ward, Tony J.

    2012-01-01

    In 2005 through 2008 a small rural mountain valley community engaged in a wood stove changeout program to address concerns of poor ambient air quality. During this program we assessed changes to indoor air quality before and after the introduction of a new, lower emission wood stove. We previously reported a greater than 70% reduction in indoor PM2.5 concentrations in homes following the installation of a new EPA-certified stove within the home. We report here on follow-up of the experiences in these and other homes over three winters of sample collection. In 21 homes, we compared pre-changeout PM2.5 concentrations (mean (sd) = 45.0 (33.0) μg/m3) to multiple post-changeout measures of PM2.5 concentrations using a DustTrak. The mean reduction (and 95% confidence interval) from pre-changeout to post-changeout was −18.5 μg/m3 (−31.9, −5.2), adjusting for ambient PM2.5, ambient temperature, and other factors. Findings across homes and across years were highly variable, and a subset of homes did not experience a reduction in PM2.5 following changeout. Reductions were also observed for organic carbon, elemental carbon, and levoglucosan, but increases were observed for dehydroabietic acid and abietic acid. Despite overall improvements in indoor air quality, the varied response across homes may be due to factors other than the introduction of a new wood stove. PMID:22607315

  9. Illinois Occupational Skill Standards: Industrial Maintenance General Maintenance Cluster.

    ERIC Educational Resources Information Center

    Illinois Occupational Skill Standards and Credentialing Council, Carbondale.

    These skill standards for the industrial maintenance general maintenance cluster are intended to be a guide to workforce preparation program providers in defining content for their programs and to employers to establish the skills and standards necessary for job acquisition. An introduction provides the Illinois perspective; Illinois Occupational…

  10. Industry assessment of human factors in aviation maintenance and inspection research program : an assessment of industry awareness and use of the Federal Aviation Administration Office of Aviation Medicine Human Factors in Aviation Maintenance and Inspection Research and Development Program from 1989 through 1998

    DOT National Transportation Integrated Search

    1998-03-01

    Ten years ago the Federal Aviation Administration (FAA) Office of Aviation Medicine embarked on a research and development program dedicated to human factors in aviation maintenance and inspection. Since 1989 FAA has invested over $12M in maintenance...

  11. Pancreatic Cancer Chemoprevention Translational Workshop | Division of Cancer Prevention

    Cancer.gov

    Thursday, September 10th (6:00 to 9:30 PM) Welcome Barnett Kramer, MD, MPH (6:00 to 6:10 PM) Director of the Division of Cancer Prevention, NCI Introduction – Goals of the Workshop: ABCs of Cancer Prevention (Agents, Biomarkers, Cohorts) Mark Miller, PhD (6:10 to 6:25 PM) Program Director Division of Cancer Prevention, NCI |

  12. 75 FR 21645 - National Cancer Institute; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ....398, Cancer Research Manpower; 93.399, Cancer Control, National Institutes of Health, HHS) Dated... Therapeutics Based on Nanotechnology, Phase II. Date: June 1, 2010. Time: 1 p.m. to 3:30 p.m. Agenda: To review... Prevention Research Small Grant Program (R03). Date: June 10-11, 2010. Time: 8 a.m. to 5 p.m. Agenda: To...

  13. PM2.5 Technology Assessment and Characterization Study in New York - PMTACS-NY: The 2001 Summer Field Intensive in Queens, NY

    NASA Astrophysics Data System (ADS)

    Demerjian, K. L.

    2002-12-01

    In the summer of 2001, an intensive field measurement campaign was carried out in Queens, NY as part of the PM2.5 Technology Assessment and Characterization Study in New York (PMTACS-NY) to characterize the physical and chemical composition of particulate matter and related precursors utilizing conventional and advanced instrumentation technologies. The measurement program, involving a team of scientists from federal, state, university and private sector organizations, was designed to provide detailed time resolved chemical and physical characterization of the urban PM2.5/co-pollutant complex in relation to the regional environment. A summary of the chemical and meteorological data defining specific events during the field intensive is presented as are results addressing specific hypothesis designed around PMTACS-NY program objectives. These include initial findings and conclusions related to 1) performance testing and evaluation of emerging measurement technologies and comparison with EPA mandated PM federal reference methods currently operational as part of the New York State and national PM2.5 monitoring network; 2) emissions characterization of CNG, standard diesel and CRT (Continuously Regenerating Technology) diesel retrofit powered vehicles; and 3) compositional comparisons of urban and regional PM2.5.

  14. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... airworthiness maintenance program use by fractional ownership program manager. Fractional ownership program... through 91.1443. Any program manager who elects to maintain the program aircraft using a continuous...

  15. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  16. 76 FR 14712 - Bureau of Educational and Cultural Affairs (ECA) Request for Grant Proposals: Global Connections...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... to coordinate program activities with Post and ECA, keeping all involved parties informed of program... include one extra copy of the completed SF-424 form and place it in an envelope addressed to ``ECA/EX/PM..., ECA-IIP/EX/PM, Ref.: ECA/PE/C/PY-11- 32, SA-5, Floor 4, Department of State, 2200 C Street, NW...

  17. Emissions reduction policies and recent trends in Southern California's ambient air quality.

    PubMed

    Lurmann, Fred; Avol, Ed; Gilliland, Frank

    2015-03-01

    To assess accountability and effectiveness of air regulatory policies, we reviewed more than 20 years of monitoring data, emissions estimates, and regulatory policies across several southern California communities participating in a long-term study of children's health. Between 1994 and 2011, air quality improved for NO2 and PM2.5 in virtually all the monitored communities. Average NO2 declined 28% to 53%, and PM2.5 decreased 13% to 54%. Year-to-year PM2.5 variability at lower pollution sites was large compared to changes in long-term trends. PM10 and O3 decreases were largest in communities that were initially among the most polluted. Trends in annual average NO2, PM2.5, and PM10 concentrations in higher pollution communities were generally consistent with NOx, ROG, SOx, PM2.5, and PM10 emissions decreases. Reductions observed at one of the higher PM2.5 sites, Mira Loma, were generally within the range expected from reductions observed in ROG, NOx, SOx, and PM2.5 emissions. Despite a 38% increase in regional motor vehicle activity, vigorous economic growth, and a 30% population increase, total estimated emissions of NOx, ROG, SOx, PM2.5, and PM10 decreased by 54%, 65%, 40%, 21%, and 15%, respectively, during the 20-year time period. Emission control strategies in California have achieved dramatic reductions in ambient NO2, O3, PM2.5, and PM10. However, additional reductions will still be needed to achieve current health-based clean air standards. For many cities facing the challenge of reducing air pollution to meet health-based standards, the emission control policies and pollution reduction programs adopted in southern California should serve as an example of the potential success of aggressive, comprehensive, and integrated approaches. Policies targeting on-road mobile emissions were the single most important element for observed improvements in the Los Angeles region. However, overall program success was the result of a much broader approach designed to achieve emission reductions across all major pollutants and emissions categories.

  18. 77 FR 34898 - Approval and Promulgation of Implementation Plans; Mississippi; 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...'' system, which means EPA will not know your identity or contact information unless you provide it in the... modeling to assure attainment and maintenance of the NAAQS. States were required to submit such SIPs to EPA... infrastructure elements for the 1997 PM 2.5 NAAQS by October 3, 2008. On July 6, 2011, WildEarth Guardians and...

  19. 78 FR 58868 - Airworthiness Directives; Agusta S.p.A. (Type Certificate Currently Held by Agusta Westland S.p.A...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ... Airworthiness Directives; Agusta S.p.A. (Type Certificate Currently Held by Agusta Westland S.p.A) (Agusta... Office between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains... standard maintenance regulations. For helicopters with T/R hub and blade assembly, part number (P/N) 109...

  20. Ex-vivo perfusion machines in kidney transplantation. The significance of the resistivity index.

    PubMed

    Elec, Florin Ioan; Lucan, Ciprian; Ghervan, Liviu; Munteanu, Valentin; Moga, Silviu; Suciu, Mihai; Enache, Dan; Elec, Alina; Munteanu, Adriana; Barbos, Adrian; Iacob, Gheorghita; Lucan, Mihai

    2014-01-01

    With a growing shortage of organs for transplantation, finding ways of increasing the donor organ pool remains of utmost importance. Perfusion machines (PM) have been proven to enhance the potential for kidney transplants to function sooner, last longer, giving patients the opportunity for a better life quality. The aim of this study is to evaluate the relation between the resistance index provided by the PM, the postoperative resistance index measured by Doppler ultrasound and the initial graft outcome. Between January 2012-December 2012, clinical data obtained from 82 consecutive renal transplants from brain death donors (BDD) which underwent PM maintenance were analyzed in a transversal study. Prior transplantation we recorded the solution temperature, filtration rate and the resistance index provided by PM. After the surgical intervention, each patient had standard follow-up. Doppler ultrasound resistivity index (RI) was recorded on the first postoperative day. Out of 115 renal transplants, 98 (85.21%) were performed with grafts from BDD. The PM was used for 82 renal grafts. The Doppler resistance index in relation to the resistance index shows a highly statistical correlation by linear regression (R=0.813, p<0.0001). Primary graft function was recorded in 74 patients (90.24%) and it was highly statistically significant correlated with the resistance index measured by PM. Out of 8 patients with primary non-function, 6 patients recovered with normal graft function at one year. The resistivity index recorded by the life-port machine is correlated with the vascular resistivity index measured by Doppler ultrasound and thus it may predicts the primary graft outcome.

  1. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...

  2. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...

  3. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...

  4. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...

  5. 76 FR 76684 - Idaho: Tentative Approval of State Underground Storage Tank Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    .... Skyline, Suite B, Idaho Falls, ID 83402 from 10 a.m. to 12 p.m. and 1 p.m. to 4 p.m.; and 6. IDEQ Lewiston... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 281 [EPA-R10-UST-2011-0896; FRL-9502-6] Idaho...). ACTION: Proposed rule. SUMMARY: The State of Idaho has applied for final approval of its Underground...

  6. 78 FR 20119 - Center for Scientific Review; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ...: AIDS and AIDS Related Research. Date: April 23-24, 2013. Time: 10:00 a.m. to 5:00 p.m. Agenda: To... Special Emphasis Panel; PAR Panel: SIDS and BRAIN. Date: April 24, 2013. Time: 1:00 p.m. to 4:00 p.m... Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research, 93.306, 93.333, 93.337, 93...

  7. 75 FR 13557 - Center for Scientific Review; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ...: Molecular and Cellular Neuroscience. Date: April 1, 2010. Time: 1 p.m. to 4 p.m. Agenda: To review and... . (Catalogue of Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical...

  8. 77 FR 13134 - Center for Scientific Review: Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ...: Child Psychopathology and Developmental Disabilities. Date: March 27, 2012. Time: 1 p.m. to 3 p.m... Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research, 93.306, 93.333...

  9. 77 FR 41793 - Center for Scientific Review; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... and Population Studies: Special Topics. Date: July 30, 2012. Time: 3:30 p.m. to 4 p.m. Agenda: To.... (Catalogue of Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical...

  10. A pilot study comparing two weight loss maintenance interventions among low-income, mid-life women

    PubMed Central

    2013-01-01

    Background Despite high obesity prevalence rates, few low-income midlife women participate in weight loss maintenance trials. This pilot study aims to assess the effectiveness of two weight loss maintenance interventions in this under-represented population. Methods Low-income midlife women who completed a 16-week weight loss intervention and lost ≥ 8 lbs (3.6 kg) were eligible to enroll in one of two 12-month maintenance programs. The programs were similar in content and had the same number of total contacts, but were different in the contact modality (Phone + Face-to-Face vs. Face-to-Face Only). Two criteria were used to assess successful weight loss maintenance at 12 months: (1) retaining a loss of ≥ 5% of body weight from the start of the weight loss phase and (2) a change in body weight of < 3%, from the start to the end of the maintenance program. Outcome measures of changes in physiologic and psychosocial factors, and evaluations of process measures and program acceptability (measured at 12 months) are also reported. For categorical variables, likelihood ratio or Fisher’s Exact (for small samples) tests were used to evaluate statistically significant relationships; for continuous variables, t-tests or their equivalents were used to assess differences between means and also to identify correlates of weight loss maintenance. Results Overall, during the 12-month maintenance period, 41% (24/58) of participants maintained a loss of ≥ 5% of initial weight and 43% (25/58) had a <3% change in weight. None of the comparisons between the two maintenance programs were statistically significant. However, improvements in blood pressure and dietary behaviors remained significant at the end of the 12-month maintenance period for participants in both programs. Participant attendance and acceptability were high for both programs. Conclusions The effectiveness of two pilot 12-month maintenance interventions provides support for further research in weight loss maintenance among high-risk, low-income women. Trial registration ClinicalTrials.gov Identifier: NCT00288301 PMID:23855318

  11. A predictive modeling approach to increasing the economic effectiveness of disease management programs.

    PubMed

    Bayerstadler, Andreas; Benstetter, Franz; Heumann, Christian; Winter, Fabian

    2014-09-01

    Predictive Modeling (PM) techniques are gaining importance in the worldwide health insurance business. Modern PM methods are used for customer relationship management, risk evaluation or medical management. This article illustrates a PM approach that enables the economic potential of (cost-) effective disease management programs (DMPs) to be fully exploited by optimized candidate selection as an example of successful data-driven business management. The approach is based on a Generalized Linear Model (GLM) that is easy to apply for health insurance companies. By means of a small portfolio from an emerging country, we show that our GLM approach is stable compared to more sophisticated regression techniques in spite of the difficult data environment. Additionally, we demonstrate for this example of a setting that our model can compete with the expensive solutions offered by professional PM vendors and outperforms non-predictive standard approaches for DMP selection commonly used in the market.

  12. Treatment Algorithms Based on Tumor Molecular Profiling: The Essence of Precision Medicine Trials.

    PubMed

    Le Tourneau, Christophe; Kamal, Maud; Tsimberidou, Apostolia-Maria; Bedard, Philippe; Pierron, Gaëlle; Callens, Céline; Rouleau, Etienne; Vincent-Salomon, Anne; Servant, Nicolas; Alt, Marie; Rouzier, Roman; Paoletti, Xavier; Delattre, Olivier; Bièche, Ivan

    2016-04-01

    With the advent of high-throughput molecular technologies, several precision medicine (PM) studies are currently ongoing that include molecular screening programs and PM clinical trials. Molecular profiling programs establish the molecular profile of patients' tumors with the aim to guide therapy based on identified molecular alterations. The aim of prospective PM clinical trials is to assess the clinical utility of tumor molecular profiling and to determine whether treatment selection based on molecular alterations produces superior outcomes compared with unselected treatment. These trials use treatment algorithms to assign patients to specific targeted therapies based on tumor molecular alterations. These algorithms should be governed by fixed rules to ensure standardization and reproducibility. Here, we summarize key molecular, biological, and technical criteria that, in our view, should be addressed when establishing treatment algorithms based on tumor molecular profiling for PM trials. © The Author 2015. Published by Oxford University Press.

  13. Avionics Maintenance Technology Program Guide.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Dept. of Vocational Education.

    This program guide presents the avionics maintenance technology curriculum for technical institutes in Georgia. The general information section contains the following for both the diploma program and the associate degree program: purpose and objectives; program description, including admissions, typical job titles, and accreditation and…

  14. 76 FR 39033 - Airworthiness Directives; Rolls-Royce Deutschland Ltd & Co KG (RRD) BR700-710 Series Turbofan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... limitation section (ALS) of their approved maintenance program (Time Limits Manual (TLM), chapters 05-00-01... airplanes used for pilot training. Revise their ALS of their approved maintenance program (TLM chapters 05... limitations section (ALS) of the operators approved maintenance program (reference the Time Limits Manual (TLM...

  15. AUPHEP—Austrian Project on Health Effects of Particulates—general overview

    NASA Astrophysics Data System (ADS)

    Hauck, H.; Berner, A.; Frischer, T.; Gomiscek, B.; Kundi, M.; Neuberger, M.; Puxbaum, H.; Preining, O.; Auphep-Team

    AUPHEP was started in 1999 as a 5 years program to investigate the situation of the atmospheric aerosol with respect to effects on human health. At four different sites in Austria (3 urban and one rural site) an extended monitoring program was conducted for PM 1, PM 2.5 and PM 10 as well as particle number concentration for 12 months each. Beside continuous measurements using TEOM and beta attenuation high-volume sampling of PM 2.5 and PM 10 provided samples for chemical analyses of various ions, heavy metals and organic compounds. Furthermore, carbonaceous material (TC, EC, OC) year round and PAHs on selected days were analyzed. From collocated public monitoring stations also pollutant gases (SO 2, NO, NO 2, O 3, CO) and meteorological components are available. In winter and summer campaigns aerosol size spectra including chemical components were measured for at least one week each. All data are collected in a project data base (CD-ROM). While extensive data analysis will be presented in following papers, some general results are presented within this paper: annual averages for PM 1 are between 10 and 20 μg m -3, for PM 2.5 between 15 and 26 mg m -3 and for PM 10 between 20 and 38 μg m -3. Number concentrations are between 10,000 and 30,000 cm -3. Urban concentrations are usually higher in winter, rural concentrations in summer. PM 2.5 is in average around 70% of PM 10, for PM 1 this fraction is about 57%. Several studies on health effects are included in this project: a cross-sectional study on preschool and school children regarding lung function measurements and questionnaires about respiratory impairment in the surrounding area of the monitoring sites as well as time series studies on mortality and respiratory morbidity on the general population.

  16. Laboratory services series: a master-slave manipulator maintenance program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenness, R. G.; Hicks, R. E.; Wicker, C. D.

    1976-12-01

    The volume of master slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and development of precise procedures for accomplishing the maintenance of 287 installed units. A very satisfactory computer programmed maintenance system has been established at the Laboratory to provide an economical approach to preventive maintenance.

  17. Method and computer program product for maintenance and modernization backlogging

    DOEpatents

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  18. PNT1 is a C11 cysteine peptidase essential for replication of the Trypanosome Kinetoplast

    DOE PAGES

    Grewal, Jaspreet S.; McLuskey, Karen; Das, Debanu; ...

    2016-03-03

    The structure of a C11 peptidase PmC11 from the gut bacterium, Parabacteroides merdae, has recently been determined, enabling the identification and characterization of a C11 orthologue, PNT1, in the parasitic protozoon Trypanosoma brucei. A phylogenetic analysis identified PmC11 orthologues in bacteria, archaea, Chromerids, Coccidia, and Kinetoplastida, the latter being the most divergent. A primary sequence alignment of PNT1 with clostripain and PmC11 revealed the position of the characteristic His-Cys catalytic dyad (His 99 and Cys 136), and an Asp (Asp 134) in the potential S 1 binding site. Immunofluorescence and cryoelectron microscopy revealed that PNT1 localizes to the kinetoplast, anmore » organelle containing the mitochondrial genome of the parasite (kDNA), with an accumulation of the protein at or near the antipodal sites. Depletion of PNT1 by RNAi in the T. brucei bloodstream form was lethal both in in vitro culture and in vivo in mice and the induced population accumulated cells lacking a kinetoplast. In contrast, overexpression of PNT1 led to cells having mislocated kinetoplasts. RNAi depletion of PNT1 in a kDNA independent cell line resulted in kinetoplast loss but was viable, indicating that PNT1 is required exclusively for kinetoplast maintenance. Expression of a recoded wild-type PNT1 allele, but not of an active site mutant restored parasite viability after induction in vitro and in vivo confirming that the peptidase activity of PNT1 is essential for parasite survival. Furthermore, these data provide evidence that PNT1 is a cysteine peptidase that is required exclusively for maintenance of the trypanosome kinetoplast.« less

  19. Development of Experience-based Learning about Atmospheric Environment with Quantitative Viewpoint aimed at Education for Sustainable Development

    NASA Astrophysics Data System (ADS)

    Saitoh, Y.; Tago, H.

    2014-12-01

    The word "ESD (Education for Sustainable Development)" has spread over the world in UN decade (2005 - 2014), and the momentum of the educational innovation aimed at ESD also has grown in the world. Especially, environmental educations recognized as one of the most important ESD have developed in many countries including Japan, but most of those are still mainly experiences in nature. Those could develop "Respect for Environment" of the educational targets of ESD, however we would have to take a further step in order to enhance "Ability of analysis and thinking logically about the environment" which are also targets of ESD.Thus, we developed experienced-learning program about atmospheric particulate matter (PM2.5), for understanding the state of the environment objectively based on quantitative data. PM2.5 is known for harmful, and various human activities are considered a source of it, therefore environmental standards for PM2.5 have been established in many countries. This program was tested on junior high school students of 13 - 15 years old, and the questionnaire survey also was conducted to them before and after the program for evaluating educational effects. Students experienced to measure the concentration of PM2.5 at 5 places around their school in a practical manner. The measured concentration of PM2.5 ranged from 19 to 41 μg/m3/day, that value at the most crowded roadside exceeded Japan's environmental standard (35 μg/m3/day). Many of them expressed "Value of PM2.5 is high" in their individual discussion notes. As a consistent with that, the answer "Don't know" to the question "What do you think about the state of the air?" markedly decreased after the program, on the other hand the answer "Pollution" to the same question increased instead. From above-mentioned, it was considered that they could judge the state of the air objectively. Consequently, the questionnaire result "Concern about Air Pollution" increased significantly after the program compared to before. Additionally, they seemed to try to think logically about what influenced PM2.5, focusing on various factors such as traffic (car), wind direction and velocity, which were frequently-appearing words in the text-mining of discussion notes.

  20. Chemical mass balance (CMB) source apportionment and organic speciation of PM(2.5) in Missoula, Montana including the 2000 wildfire season

    NASA Astrophysics Data System (ADS)

    Ward, Tony J.

    A yearlong sampling program for PM2.5, Semi- Volatile Organic Compounds (SVOCs), and Volatile Organic Compounds (VOCs) was conducted in 2000/2001. The data were used in a Chemical Mass Balance (CMB) Source Apportionment Model (Version 8.0) to apportion the sources of PM2.5 in the Missoula Valley. Results showed that wood combustion contributed an average of 41% to the fine fraction throughout the year. The second largest source of PM 2.5 was diesel (19%), followed by ammonium nitrate (17%), the kraft recovery boilers from Smurfit-Stone Container (14%), other hog fuel boilers (6%), and street sand (5%). Results also showed that PM2.5 levels and contributions from sources were consistent on both sides of the Missoula Valley, but VOCs were twice as high in Missoula compared to Frenchtown. Another aspect of this program was to investigate the organic fraction of the Missoula Valley PM2.5 by evaluating a modified Federal Reference Method (FRM) PM2.5 sampler. A method comparison was also made between sampling for SVOCs using the modified PM2.5 sampler and in using a Hi-volume Polyurethane Foam (PUF) sampler. Results showed that the PM 2.5 PUF measured more of the lighter SVOCs compared to the Hi-vol PUF sampler. This is most likely the result of the higher flows through the Hi-vol PUF which ``strip'' the lighter organics from the surface of the filter. The wildland fires of summer 2000 comprised one of the most severe fire seasons is U.S. history, and had a direct impact on the city of Missoula. Sampling in Missoula was already in progress when the fires began and smoke started rolling into the Missoula Valley. Samples were collected before, during, and after the 2000 fire season, and a detailed characterization of particulate and gaseous emissions from extensive wildland fires was obtained. The 2000/2001 CMB Sampling Program data collected during the 2000 fire season suggest that the main health impacts to downwind populations reside in the fine particulate exposures, with an average of 81% of the Missoula Valley PM2.5 resulting from forest fires.

  1. 78 FR 70956 - Center for Scientific Review; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-27

    ... of Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research...: AIDS and AIDS Related Research. Date: December 6, 2013. Time: 1:00 p.m. to 4:00 p.m. Agenda: To review...

  2. 75 FR 33629 - Center for Scientific Review; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-14

    ...: Cancer Molecular Therapy. Date: June 17, 2010. Time: 1:30 p.m. to 3:30 p.m. Agenda: To review and... Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research, 93.306...

  3. 75 FR 13134 - Center for Scientific Review; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ...: Cellular and Molecular Neuroscience. Date: March 29, 2010. Time: 2:30 p.m. to 4 p.m. Agenda: To review and... Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research, 93.306...

  4. 75 FR 42451 - Center for Scientific Review; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-21

    ...: Developmental and Molecular Biology. Date: July 30, 2010. Time: 4 p.m. to 6 p.m. Agenda: To review and evaluate... of Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research...

  5. 78 FR 46593 - Center for Scientific Review; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ...: Molecular and Cellular Neurobiology. Date: August 12, 2013. Time: 3:00 p.m. to 6:00 p.m. Agenda: To review.... (Catalogue of Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical...

  6. REGULATORY METHODS PROGRAM SUPPORT FOR NAAQSS

    EPA Science Inventory

    This task supports attainment determinations of the National Ambient Air Quality Standards (NAAQS) for particulate matter (PM) in the areas of development, testing, and improvement of new and current PM Federal Reference Methods (FRMs) and Federal Equivalent Methods (FEMs). The ...

  7. 76 FR 72958 - Center For Scientific Review; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ... Special Emphasis Panel; Tissue Engineering and Signaling. Date: December 13, 2011. Time: 3 p.m. to 4 p.m... Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research, 93.306, 93.333...

  8. 76 FR 7231 - Wild Horse and Burro Advisory Board; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-09

    ... Sheraton Phoenix Downtown Hotel, 340 N. 3rd Street, Phoenix, Arizona, 85004. The hotel phone number for... June 15, 2010 Minutes Program Updates Gathers Adoptions Budget Facilities Break (2:20 p.m.--2:45 p.m...

  9. 78 FR 16860 - Center for Scientific Review; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ... Panel; Program Project: A Proteomics Research Center for Integrative Biology. Date: April 8-10, 2013... Special Emphasis Panel; Member Conflict: Cancer Biology. Date: April 11, 2013. Time: 2:00 p.m. to 4:30 p.m...

  10. VHF command system study. [spectral analysis of GSFC VHF-PSK and VHF-FSK Command Systems

    NASA Technical Reports Server (NTRS)

    Gee, T. H.; Geist, J. M.

    1973-01-01

    Solutions are provided to specific problems arising in the GSFC VHF-PSK and VHF-FSK Command Systems in support of establishment and maintenance of Data Systems Standards. Signal structures which incorporate transmission on the uplink of a clock along with the PSK or FSK data are considered. Strategies are developed for allocating power between the clock and data, and spectral analyses are performed. Bit error probability and other probabilities pertinent to correct transmission of command messages are calculated. Biphase PCM/PM and PCM/FM are considered as candidate modulation techniques on the telemetry downlink, with application to command verification. Comparative performance of PCM/PM and PSK systems is given special attention, including implementation considerations. Gain in bit error performance due to coding is also considered.

  11. 14 CFR 91.1111 - Maintenance training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Maintenance training. 91.1111 Section 91... Operations Program Management § 91.1111 Maintenance training. The program manager must ensure that all... annual recurrent training and are competent to perform those duties. ...

  12. 14 CFR 91.1111 - Maintenance training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Maintenance training. 91.1111 Section 91... Operations Program Management § 91.1111 Maintenance training. The program manager must ensure that all... annual recurrent training and are competent to perform those duties. ...

  13. 36 CFR 1222.34 - How must agencies maintain records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADMINISTRATION RECORDS MANAGEMENT CREATION AND MAINTENANCE OF FEDERAL RECORDS Agency Recordkeeping Requirements § 1222.34 How must agencies maintain records? Agencies must implement a records maintenance program so... electronic records, segregable. Agency records maintenance programs must: (a) Institute procedures for...

  14. 40 CFR 52.2348 - National Highway Systems Designation Act Motor Vehicle Inspection and Maintenance (I/M) Programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false National Highway Systems Designation Act Motor Vehicle Inspection and Maintenance (I/M) Programs. 52.2348 Section 52.2348 Protection of... and Maintenance (I/M) Programs. (a) On March 15, 1996 the Governor of Utah submitted a revised I/M...

  15. 40 CFR 52.2348 - National Highway Systems Designation Act Motor Vehicle Inspection and Maintenance (I/M) Programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false National Highway Systems Designation Act Motor Vehicle Inspection and Maintenance (I/M) Programs. 52.2348 Section 52.2348 Protection of... and Maintenance (I/M) Programs. (a) On March 15, 1996 the Governor of Utah submitted a revised I/M...

  16. 78 FR 21861 - Tribal Consultation on the Draft Regulations Governing the Tribal Transportation Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... regarding the following topics: On July 6, 2012, Moving Ahead for Progress in the 21st Century Act (MAP-21...:30 p.m. May 16, 2013 Phoenix, AZ 9 a.m.-4:30 p.m. May 21, 2013 Minneapolis, MN 9 a.m.-4:30 p.m... President Obama and became effective on October 1, 2012. Section 1119 of MAP-21 struck the existing laws...

  17. Defense Coastal/Estuarine Research Program (DCERP1)

    DTIC Science & Technology

    2013-05-10

    also showed that the greater the mixing height and ventilation rate, the lower the PM2.5 concentrations, which points to the diluting effect of these... ventilation rate, the lower the resulting PM2.5 concentrations, which points to the diluting effects of these parameters on ambient PM2.5 concentration...and discharge (New River, tributary creeks) Chemistry: Nutrients, salinity, pH, oxygen , temperature (New River, NRE, tributary creeks) Sedimentology

  18. Description and Results of the Air Force Research and Development Program for the Improvement of Maintenance Efficiency.

    ERIC Educational Resources Information Center

    Foley, John P., Jr.

    An overview of the Air Force's Research and Development Program for the Improvement of Maintenance Efficiency is provided. First described are the steps found in any detailed task analysis, a process which results in the complete specification of each task involved in an overall maintenance effort. The factors influencing maintenance effectiveness…

  19. A motivation-focused weight loss maintenance program is an effective alternative to a skill-based approach.

    PubMed

    West, D S; Gorin, A A; Subak, L L; Foster, G; Bragg, C; Hecht, J; Schembri, M; Wing, R R

    2011-02-01

    Maintaining weight loss is a major challenge in obesity treatment. Individuals often indicate that waning motivation prompts cessation of effective weight management behaviors. Therefore, a novel weight loss maintenance program that specifically targets motivational factors was evaluated. Overweight women (N=338; 19% African American) with urinary incontinence were randomized to lifestyle obesity treatment or control and followed for 18 months. All participants in lifestyle (N=226) received the same initial 6-month group behavioral obesity treatment and were then randomized to (1) a novel motivation-focused maintenance program (N=113) or (2) a standard skill-based maintenance approach (N=113). Weight assessed at baseline, 6 and 18 months. Both treatment groups (motivation-focused and skill-based) achieved comparable 18-month weight losses (-5.48% for motivation-focused vs -5.55% in skill-based, P=0.98), and both groups lost significantly more than controls (-1.51%; P=0.0012 in motivation-focused and P=0.0021 in skill-based). A motivation-focused maintenance program offers an alternative, effective approach to weight maintenance expanding available evidence-based interventions beyond traditional skill-based programs.

  20. Advanced powder metallurgy aluminum alloys and composites

    NASA Technical Reports Server (NTRS)

    Lisagor, W. B.; Stein, B. A.

    1982-01-01

    The differences between powder and ingot metallurgy processing of aluminum alloys are outlined. The potential payoff in the use of advanced powder metallurgy (PM) aluminum alloys in future transport aircraft is indicated. The national program to bring this technology to commercial fruition and the NASA Langley Research Center role in this program are briefly outlined. Some initial results of research in 2000-series PM alloys and composites that highlight the property improvements possible are given.

  1. Polycyclic aromatic hydrocarbon components contribute to the mitochondria-antiapoptotic effect of fine particulate matter on human bronchial epithelial cells via the aryl hydrocarbon receptor

    PubMed Central

    2010-01-01

    Background Nowadays, effects of fine particulate matter (PM2.5) are well-documented and related to oxidative stress and pro-inflammatory response. Nevertheless, epidemiological studies show that PM2.5 exposure is correlated with an increase of pulmonary cancers and the remodeling of the airway epithelium involving the regulation of cell death processes. Here, we investigated the components of Parisian PM2.5 involved in either the induction or the inhibition of cell death quantified by different parameters of apoptosis and delineated the mechanism underlying this effect. Results In this study, we showed that low levels of Parisian PM2.5 are not cytotoxic for three different cell lines and primary cultures of human bronchial epithelial cells. Conversely, a 4 hour-pretreatment with PM2.5 prevent mitochondria-driven apoptosis triggered by broad spectrum inducers (A23187, staurosporine and oligomycin) by reducing the mitochondrial transmembrane potential loss, the subsequent ROS production, phosphatidylserine externalization, plasma membrane permeabilization and typical morphological outcomes (cell size decrease, massive chromatin and nuclear condensation, formation of apoptotic bodies). The use of recombinant EGF and specific inhibitor led us to rule out the involvement of the classical EGFR signaling pathway as well as the proinflammatory cytokines secretion. Experiments performed with different compounds of PM2.5 suggest that endotoxins as well as carbon black do not participate to the antiapoptotic effect of PM2.5. Instead, the water-soluble fraction, washed particles and organic compounds such as polycyclic aromatic hydrocarbons (PAH) could mimic this antiapoptotic activity. Finally, the activation or silencing of the aryl hydrocarbon receptor (AhR) showed that it is involved into the molecular mechanism of the antiapoptotic effect of PM2.5 at the mitochondrial checkpoint of apoptosis. Conclusions The PM2.5-antiapoptotic effect in addition to the well-documented inflammatory response might explain the maintenance of a prolonged inflammation state induced after pollution exposure and might delay repair processes of injured tissues. PMID:20663163

  2. 76 FR 27069 - National Institute of Allergy and Infectious Diseases; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ..., Immunology and Transplantation (R24).'' Date: May 31, 2011. Time: 2 p.m. to 4 p.m. Agenda: To review and... Assistance Program Nos. 93.855, Allergy, Immunology, and Transplantation Research; 93.856, Microbiology and...

  3. 77 FR 61009 - National Institute of Allergy and Infectious Diseases; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ..., Immunology & Transplantation. Date: October 25, 2012. Time: 1:00 p.m. to 5:00 p.m. Agenda: To review and... Assistance Program Nos. 93.855, Allergy, Immunology, and Transplantation Research; 93.856, Microbiology and...

  4. 40 CFR 52.1990 - Interstate Transport for the 2006 24-hour PM2.5 NAAQS.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1990 Interstate Transport for the 2006 24-hour PM2.5 NAAQS. (a) EPA approves the portion of Oregon...

  5. 40 CFR 52.1990 - Interstate Transport for the 2006 24-hour PM2.5 NAAQS.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1990 Interstate Transport for the 2006 24-hour PM2.5 NAAQS. (a) EPA approves the portion of Oregon...

  6. 78 FR 21616 - Center for Scientific Review; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ..., oral microbiology and oral pathology. Date: May 1, 2013. Time: 1:00 p.m. to 4:30 p.m. Agenda: To review... Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research, 93.306, 93.333...

  7. 78 FR 64963 - Center for Scientific Review; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ...: Cancer Prevention and Treatment Date: November 7, 2013. Time: 1:00 p.m. to 4:00 p.m. Agenda: To review... Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research, 93.306, 93.333...

  8. 78 FR 24222 - Center for Scientific Review; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Diagnostics and Treatments. Date: May 3, 2013. Time: 1:00 p.m. to 2:00 p.m. Agenda: To review and evaluate... Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research, 93.306...

  9. 78 FR 16273 - Center for Scientific Review; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ...: Cardiovascular Clinical and Translational Studies Date: April 4, 2013. Time: 1:30 p.m. to 3:30 p.m. Agenda: To... Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research, 93.306, 93.333...

  10. Traffic-related immissions and their impact on historic buildings and monuments

    NASA Astrophysics Data System (ADS)

    Auras, M.; Beer, S.; Bundschuh, P.; Eichhorn, J.; Mach, M.; Scheuvens, D.; Schorling, M.; von Schumann, J.; Snethlage, R.; Weinbruch, S.

    2012-04-01

    Air quality in Germany has improved essentially over the last decades. Because the concentrations of sulfur dioxide were reduced by more than 90% between 1990 and 2007 acid rain no longer seems to play a relevant role in the weathering of natural stone facades of historic buildings. But in the surroundings of urban traffic hot spots high emissions of nitrogen oxides and fine particulate matter (PM10) are observed. Therefore the question arises whether these airborne pollutants bear a potential for future damage of natural stone and other construction materials. In an interdisciplinary research program different approaches were pursued to evaluate the damage potential of today's traffic-induced immissions by exemplarily investigating two German cities, Mainz and Munich. First calculations of average weathering rates for the stones concerned were made using the dose-response functions of the MULTI ASSESS program and the immission data from survey stations at traffic hot spots and at housing areas. Than the distribution of traffic-induced immissions (NO2 and PM10) in the surrounding areas of major traffic pathways was calculated for both cities with the simulation program WINkfz. The resulting maps of mean pollutant concentrations were superimposed to inventory maps of historical monuments to allow the identification of monuments with high pollution loads. Additionally different classes of natural stones were distinguished regarding their chemical reactivity. Two prominent monuments with high traffic-induced pollution loads were selected for small scale simulations of pollutant immissions with the simulation program MISKAM. The dispersion of pollutants to different directions and building heights were calculated and the influence of broadleaf trees in the surrounding of the buildings was evaluated (summer versus winter situation). PM10 measurements were carried out at different building heights of the two buildings. Collection of PM10 dust and single-particle analyses by ESEM permits the classification of PM10 particles and the identification and quantification of the traffic-induced part of total PM10.

  11. Cost effectiveness of the MDOT preventive maintenance program.

    DOT National Transportation Integrated Search

    2013-04-01

    The Michigan Department of Transportations (MDOT) pavement preservation program dates back to 1992. MDOTs pavement preservation strategy is primarily implemented through its capital preventive maintenance (CPM) program, in which preventive main...

  12. Ex-vivo perfusion machines in kidney transplantation. The significance of the resistivity index

    PubMed Central

    ELEC, FLORIN IOAN; LUCAN, CIPRIAN; GHERVAN, LIVIU; MUNTEANU, VALENTIN; MOGA, SILVIU; SUCIU, MIHAI; ENACHE, DAN; ELEC, ALINA; MUNTEANU, ADRIANA; BARBOS, ADRIAN; IACOB, GHEORGHITA; LUCAN, MIHAI

    2014-01-01

    Introduction With a growing shortage of organs for transplantation, finding ways of increasing the donor organ pool remains of utmost importance. Perfusion machines (PM) have been proven to enhance the potential for kidney transplants to function sooner, last longer, giving patients the opportunity for a better life quality. Objective The aim of this study is to evaluate the relation between the resistance index provided by the PM, the postoperative resistance index measured by Doppler ultrasound and the initial graft outcome. Material and method Between January 2012-December 2012, clinical data obtained from 82 consecutive renal transplants from brain death donors (BDD) which underwent PM maintenance were analyzed in a transversal study. Prior transplantation we recorded the solution temperature, filtration rate and the resistance index provided by PM. After the surgical intervention, each patient had standard follow-up. Doppler ultrasound resistivity index (RI) was recorded on the first postoperative day. Results Out of 115 renal transplants, 98 (85.21%) were performed with grafts from BDD. The PM was used for 82 renal grafts. The Doppler resistance index in relation to the resistance index shows a highly statistical correlation by linear regression (R=0.813, p<0.0001). Primary graft function was recorded in 74 patients (90.24%) and it was highly statistically significant correlated with the resistance index measured by PM. Out of 8 patients with primary non-function, 6 patients recovered with normal graft function at one year. Conclusion The resistivity index recorded by the life-port machine is correlated with the vascular resistivity index measured by Doppler ultrasound and thus it may predicts the primary graft outcome. PMID:26527992

  13. 25 CFR 170.925 - Is ERFO funding supplemental to IRR Program funding?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Miscellaneous Provisions Emergency Relief § 170.925 Is ERFO funding supplemental to... construction and maintenance funds for FHWA-approved repairs. If IRR construction or maintenance funds are used... used to reimburse the construction or maintenance funds expended. ...

  14. 14 CFR 91.1433 - CAMP: Maintenance and preventive maintenance training program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1433 CAMP: Maintenance and preventive... each person (including inspection personnel) who determines the adequacy of work done is fully informed...

  15. CLEAN-ROADS project: air quality considerations after the application of a novel MDSS on winter road maintenance activities

    NASA Astrophysics Data System (ADS)

    Pretto, Ilaria; Malloci, Elisa; Tonidandel, Gabriele; Benedetti, Guido; Di Napoli, Claudia; Piazza, Andrea; Apolloni, Roberto; Cavaliere, Roberto

    2016-04-01

    With this poster we present the environmental benefit on air quality derived by the application of the CLEAN-ROADS pilot project. The CLEAN-ROADS project addresses the problem of the environmental pollution caused by de-icing salts during winter road maintenance activities in the Province of Trento (Italy). A demonstrative Maintenance Decision Support System (MDSS) has been developed in order to improve the intervention procedures of the road management service. Specifically it aims to optimize the efficiency of how available resources (e.g., salt consumption) are currently used while guaranteeing the current level of road safety. The CLEAN-ROADS project has been tested and validated on a test area located in a valley bottom (Adige Valley), where the highest optimization margins are to be expected. The project supports current road maintenance practices, which has proved to be reliable and accurate, with a new scalable and energy-efficient road monitoring system. This system is based on a network of road weather stations (road weather information system, RWIS) installed on the test route. It is capable to collect real-time data about the road conditions and to perform short-term and now-cast road weather forecasts, which actively integrate weather data and bulletins covering the target area [1]. This poster presents the results obtained from a three-year monitoring activity with the aim to (1) determine the impact of de-icing salts on air quality and (2) quantify the improvements obtained by the application of the CLEAN-ROADS project on air quality. The Ambient Air Quality and Cleaner Air for Europe Directive (2008/50/EC) states that contributions to exceedances of particulate matter PM10 limit values that are attributable to road winter salting may be subtracted when assessing compliance with air quality limit values, once provided that reasonable measures have been taken to lower concentrations [2]. As the de-icing salts used in road maintenance are mainly based on sodium chloride, which releases Na+ and Cl-, the estimation of the contribution of road salting to PM10 concentration can be carried out considering only measured concentrations of Na+ and Cl-. However, the presence of these elements might not be due exclusively to salting activities. For this reason data collected during first winter campaign were analysed using the Positive Matrix Factorization (PMF) Model developed by United States Environmental Protection Agency (EPA) to identify the presence of Na+ and Cl- in emission profiles of other PM10 sources (e.g., biomass burning, traffic) [3]. Through this study new guidelines have been defined for the optimization of current road management operations, and their applicability to other area in the Province of Trento has been assessed for future purposes. [1] Pretto I. et al., SIRWEC 2014 conference proceedings, ID:0019 (2014) [2] Ambient Air Quality and Cleaner Air for Europe (CAFE) Directive (2008/50/EC) [3] http://www.epa.gov/air-research/positive-matrix-factorization-model-environmental-data-analyses

  16. Building Maintenance. Florida Vocational Program Guide.

    ERIC Educational Resources Information Center

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary of Occupational Titles…

  17. 78 FR 3902 - Center for Scientific Review; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-17

    ... Assistance Program Nos. 93.306, Comparative Medicine; 93.333, Clinical Research, 93.306, 93.333, 93.337, 93... Research. Date: January 18, 2013. Time: 2:00 p.m. to 4:00 p.m. Agenda: To review and evaluate grant...

  18. 77 FR 9674 - Eunice Kennedy Shriver National Institute of Child Health and Human Development; Notice of Closed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ..., ``Male Reproduction.'' Date: March 14, 2012. Time: 2 p.m. to 4 p.m. Agenda: To review and evaluate grant..., Center for Medical Rehabilitation Research; 93.209, Contraception and Infertility Loan Repayment Program...

  19. 77 FR 59938 - Center for Scientific Review Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ... Panel; Program Project: Drug Addiction. Date: October 30-31, 2012. Time: 8:00 a.m. to 8:30 p.m. Agenda... Biomedical Computational Science and Technology Initiative. Date: October 30, 2012. Time: 3:00 p.m. to 4:00 p...

  20. A Methodical Development of Measures of Effectiveness for a Condition-Based Maintenance Management System

    DTIC Science & Technology

    2014-06-01

    21 C . CMMS USE IN THE LCS PROGRAM ......................................................22 D. CBM+ MAINTENANCE MANAGEMENT SYSTEM...45 b. Plan Maintenance Budgeting .................................................45 c . Plan Maintenance Logistics... Maintenance Planning ...................................46 b. Communicate Maintenance Budget .......................................46 c . Communicate

  1. Four Generations of Maintenance Resource Management Programs in the United States: An Analysis of the Past, Present, and Future

    NASA Technical Reports Server (NTRS)

    Taylor, James C.; Patankar, Manoj S.

    2001-01-01

    This paper analyzes four generations of Maintenance Resource Management (MRM) programs implemented by aviation maintenance organizations in the United States. Data collected from over ten years of survey research and field observations are used for this analysis; they are presented in a case-study format. The first three generations of MRM programs were episodic efforts to increase safety through teamwork, focus group discussions, and awareness courses, respectively. Now, the fourth generation programs, characterized by a commitment to long-term communication and behavioral changes in maintenance, are set to build on those earlier generations, toward a culture of mutual trust between mechanics, their managers, and regulators.

  2. 77 FR 21429 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... the maintenance planning document. This AD requires revising the maintenance program to update... Engineer, Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue SW... Register on January 19, 2011 (76 FR 3054). That NPRM proposed to require revising the maintenance program...

  3. Avionics Maintenance Technology Program Standards.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Dept. of Vocational Education.

    This publication contains statewide standards for the avionics maintenance technology program in Georgia. The standards are divided into the following categories: foundations, diploma/degree (philosophy, purpose, goals, program objectives, availability, evaluation); admissions, diploma/degree (admission requirements, provisional admission…

  4. An Analysis of Program Managers as Total Life Cycle Systems Managers

    DTIC Science & Technology

    2017-09-01

    S) AND ADDRESS(ES) N/A 10. SPONSORING / MONITORING AGENCY REPORT NUMBER 11. SUPPLEMENTARY NOTES The views expressed in this thesis are those of...Total Life Cycle Systems Management (TLCSM) is a term used in Army Regulation ( AR ) 70-1 to describe the responsibility of the Army Program Manager (PM...away from the PM. However, other Army guidance challenges AR 70-1 when transitioning to the Operations and Support phase of the acquisition life

  5. "APEC blue"--The effects and implications of joint pollution prevention and control program.

    PubMed

    Wang, Hongbo; Zhao, Laijun; Xie, Yujing; Hu, Qingmi

    2016-05-15

    To ensure good air quality in Beijing during Asia-Pacific Economic Cooperation (APEC) China 2014, Beijing and its neighboring five provinces and the associated cities were combined under the Joint Prevention and Control of Atmospheric Pollution (JPCAP) program, which implemented rigorous cooperative emission reduction measures. The program was a unique and large-scale artificial experiment that showed that such measures can achieve excellent results, and it led to the popular "APEC blue" catchphrase (i.e., Beijing's skies became blue as pollution levels decreased). This artificial experiment provided the means to effectively conduct JPCAP strategies in the future. Accordingly, our research focused on the characteristics of the six primary pollutants in Beijing. We found that the JPCAP measures directly reduced concentrations of all pollutants except O3. Through correlation analysis, we found that the band distribution of the cities with strong correlations in PM2.5 and PM10 concentrations was affected by wind conditions. Therefore, JPCAP measures should account for specific seasonal and climatic conditions. Based on cluster analysis using the results from the correlation analysis, we divided 13 cities within a 300-km radius of Beijing into different groups according to the similarity of their PM2.5 and PM10 correlation coefficients. For JPCAP measures relevant to PM2.5 and PM10, we found differences in the degrees of collaboration among cities. Therefore, depending upon the pollutant type, the JPCAP strategy should account for the cities involved, the scope of the core area, and the optimal cities to involve in the collaborative efforts based on cost-effectiveness and collaborative difficulty among the involved cities. Copyright © 2016 Elsevier B.V. All rights reserved.

  6. The ABPN Maintenance of Certification Program for psychiatrists: past history, current status, and future directions.

    PubMed

    Faulkner, Larry R; Tivnan, Patricia W; Winstead, Daniel K; Reus, Victor I; Andrade, Naleen N; Brooks, Beth Ann; Colenda, Christopher C; Mrazek, David A; Reifler, Burton V; Schneidman, Barbara

    2008-01-01

    To describe the American Board of Psychiatry and Neurology (ABPN) Maintenance of Certification Program, its underlying rationale, how it will be implemented now, and what it might look like in the future. The authors describe the philosophical foundation, specific components, and the implementation timeline of the ABPN Maintenance of Certification Program; the development of specific products that might be used by ABPN diplomates to meet its requirements; and several unanswered questions about its current status and future development. The ABPN Maintenance of Certification Program consists of specific requirements pertaining to professional standing, self-assessment and lifelong learning, performance in practice, and cognitive expertise that will be implemented incrementally over the next decade. The ABPN Maintenance of Certification Program has been implemented in a manner that is as consistent as possible with its underlying philosophical beliefs as well as the current and expected public and political concerns, diplomate needs, and the requirements of organizations responsible for licensure, credentialing, privileging, accreditation, professional development, and physician reimbursement.

  7. 49 CFR 180.505 - Quality assurance program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Quality assurance program. 180.505 Section 180.505... MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.505 Quality assurance program. The quality assurance program requirements of § 179.7 of this subchapter apply. ...

  8. Afghan National Army: DOD Has Taken Steps to Remedy Poor Management of Vehicle Maintenance Program

    DTIC Science & Technology

    2016-07-01

    contract and program were designed to promote the accurate assessment of Afghan vehicle maintenance needs, contractor performance, and cost...containment; (2) the U.S. government provided effective management and oversight of contractor performance; and (3) the contract met its program objectives...maintenance, (2) underestimated the cost of spare parts, and (3) established performance metrics that did not accurately assess contractor performance or

  9. Navy Occupational Health Information Management System (NOHIMS). Medical Exam Scheduling Module. Program Maintenance Manual

    DTIC Science & Technology

    1987-06-01

    NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOH I MS MEDICAL EXAM SCHEDULING MODULE PROGRAM MAINTENANCE MANUAL S JUNE 1987 DT11C 00... Information Management System (NOHIMS) ~ Medical Examination Scheduling (MES) Program Maintenance Manual 7. Author(s) 8. Performing Organization Rapt. No...the Navy Occupational Health Information Management System (NOHIMS). NOHIMS, whose initial version was developed at the Naval Health Research Center

  10. Methodology to estimate particulate matter emissions from certified commercial aircraft engines.

    PubMed

    Wayson, Roger L; Fleming, Gregg G; Lovinelli, Ralph

    2009-01-01

    Today, about one-fourth of U.S. commercial service airports, including 41 of the busiest 50, are either in nonattainment or maintenance areas per the National Ambient Air Quality Standards. U.S. aviation activity is forecasted to triple by 2025, while at the same time, the U.S. Environmental Protection Agency (EPA) is evaluating stricter particulate matter (PM) standards on the basis of documented human health and welfare impacts. Stricter federal standards are expected to impede capacity and limit aviation growth if regulatory mandated emission reductions occur as for other non-aviation sources (i.e., automobiles, power plants, etc.). In addition, strong interest exists as to the role aviation emissions play in air quality and climate change issues. These reasons underpin the need to quantify and understand PM emissions from certified commercial aircraft engines, which has led to the need for a methodology to predict these emissions. Standardized sampling techniques to measure volatile and nonvolatile PM emissions from aircraft engines do not exist. As such, a first-order approximation (FOA) was derived to fill this need based on available information. FOA1.0 only allowed prediction of nonvolatile PM. FOA2.0 was a change to include volatile PM emissions on the basis of the ratio of nonvolatile to volatile emissions. Recent collaborative efforts by industry (manufacturers and airlines), research establishments, and regulators have begun to provide further insight into the estimation of the PM emissions. The resultant PM measurement datasets are being analyzed to refine sampling techniques and progress towards standardized PM measurements. These preliminary measurement datasets also support the continued refinement of the FOA methodology. FOA3.0 disaggregated the prediction techniques to allow for independent prediction of nonvolatile and volatile emissions on a more theoretical basis. The Committee for Aviation Environmental Protection of the International Civil Aviation Organization endorsed the use of FOA3.0 in February 2007. Further commitment was made to improve the FOA as new data become available, until such time the methodology is rendered obsolete by a fully validated database of PM emission indices for today's certified commercial fleet. This paper discusses related assumptions and derived equations for the FOA3.0 methodology used worldwide to estimate PM emissions from certified commercial aircraft engines within the vicinity of airports.

  11. Fine particles and oxidant pollution: developing an agenda for cooperative research.

    PubMed

    Hidy, G M; Hales, J M; Roth, P M; Scheffe, R

    2000-04-01

    This paper describes a background for the North American Research Strategy for Tropospheric Ozone (NARSTO) cooperative program integrating studies of O3 and PM2.5. It discusses several important aspects for rationalizing NARSTO's trinational investigative approach, including (1) an outlook on the state of knowledge about fine particles in the troposphere and their origins in Canada, Mexico, and the United States; (2) the need for enhancement and strengthening of key field measurements in relation to tropospheric chemistry and a health effects component; and (3) the use of a central theme for advancing air quality modeling using evolving techniques to integrate and guide key process-oriented field campaigns. The importance of organizing a scientific program to acquire "policy-relevant" information is stressed, noting cooperative research directions that address combined PM2.5 and O3 issues, illustrated through exploration of hypothetical pathways of PM2.5 response to choices of O3 and PM precursor emission reductions. The information needed for PM2.5 research is noted to intersect in many cases with those of O3, but diverge in other cases. Accounting for these distinctions is important for developing NARSTO's strategy over the next decade.

  12. PM Evaluation Guidelines.

    ERIC Educational Resources Information Center

    Bauch, Jerold P.

    This paper presents guidelines for the evaluation of candidate performance, the basic function of the evaluation component of the Georgia program model for the preparation of elementary school teachers. The three steps in the evaluation procedure are outlined: (1) proficiency module (PM) entry appraisal (pretest); (2) self evaluation and the…

  13. 76 FR 44978 - Notice of FAA Intent To Carry Over Airport Improvement Program (AIP) Entitlement Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    ... Administration, DOT. ACTION: Notice. SUMMARY: By 12 p.m. prevailing local time on Friday, August 12, 2011... and local laws. The FAA is hereby notifying all sponsors that by 12 p.m. prevailing local time on...

  14. 75 FR 27350 - National Institute of Diabetes and Digestive and Kidney Diseases; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ..., Endocrinology and Metabolic Diseases. Date: June 7, 2010. Time: 1:30 p.m. to 4:30 p.m. Agenda: To review and... Assistance Program Nos. 93.847, Diabetes, Endocrinology and Metabolic Research; 93.848, Digestive Diseases...

  15. 76 FR 69745 - Center for Scientific Review; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ...: Cell Biology. Date: December 8-9, 2011. Time: 8 a.m. to 5:30 p.m. Agenda: To review and evaluate grant..., Program Project: Developmental Pharmacology. Date: December 14-15, 2011. Time: 8 a.m. to 5:30 p.m. Agenda...

  16. Navy Successes and Challenges in Cr6+ Minimization

    DTIC Science & Technology

    2011-05-12

    Authorization to Use Hexavalent Chromium. YES NO • Approval of alternatives by W/S PM and Corrosion SME designee. • Change technical/maintenance...Inorganic Coatings and Processes – Alternatives authorized for • Aluminum and magnesium anodizing • Hard Chrome Plating • Type II, Class 1A conversion...savings due to use of aluminum cathodes – Allows for consolidation of anodizing processes – Elimination of Hexavalent Chromium 80% 5% 14% 1% Type II

  17. 76 FR 2066 - Approval and Promulgation of Implementation Plans; Indiana; Removal of Vehicle Inspection and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-12

    ... ozone maintenance plans. The Indiana Department of Environmental Management (IDEM) submitted this... Promulgation of Implementation Plans; Indiana; Removal of Vehicle Inspection and Maintenance Programs for Clark... to allow the State to discontinue the vehicle inspection and maintenance (I/M) program in Clark and...

  18. 36 CFR 401.10 - Monument Trust Fund Program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... perform any deferred maintenance necessary to bring the monument up to a mutually agreeable standard. At... responsibility for its maintenance. To be accepted in the Monument Trust Fund Program, an organization must develop an acceptable maintenance plan and transfer sufficient monies to the Commission to fully fund the...

  19. 36 CFR § 401.10 - Monument Trust Fund Program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... perform any deferred maintenance necessary to bring the monument up to a mutually agreeable standard. At... responsibility for its maintenance. To be accepted in the Monument Trust Fund Program, an organization must develop an acceptable maintenance plan and transfer sufficient monies to the Commission to fully fund the...

  20. 36 CFR 401.10 - Monument Trust Fund Program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... perform any deferred maintenance necessary to bring the monument up to a mutually agreeable standard. At... responsibility for its maintenance. To be accepted in the Monument Trust Fund Program, an organization must develop an acceptable maintenance plan and transfer sufficient monies to the Commission to fully fund the...

  1. 36 CFR 401.10 - Monument Trust Fund Program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... perform any deferred maintenance necessary to bring the monument up to a mutually agreeable standard. At... responsibility for its maintenance. To be accepted in the Monument Trust Fund Program, an organization must develop an acceptable maintenance plan and transfer sufficient monies to the Commission to fully fund the...

  2. Meeting Abstracts - AMCP Managed Care & Specialty Pharmacy Annual Meeting 2018.

    PubMed

    2018-04-01

    The AMCP Managed Care & Specialty Pharmacy Annual Meeting 2018 in Boston, Massachusetts, is expected to attract more than 3,800 managed care pharmacists and other health care professionals who manage and evaluate drug therapies, develop and manage networks, and work with medical managers and information specialists to improve the care of all individuals enrolled in managed care programs. The AMCP Abstracts program provides a forum through which authors can share their insights and outcomes of advanced managed care practice. Abstracts are presented as posters on Wednesday, April 25, from 12:30 pm to 2:30 pm. Posters will also be displayed on Tuesday, April 24, from 5:45 pm to 7:30 pm, and on Thursday, April 26, from 9:30 am to 11:00 am. Podium presentations for the Platinum award-winning abstracts are Thursday, April 26, from 8:00 am to 9:15 am. Professional abstracts that have been reviewed are published in the Journal of Managed Care & Specialty Pharmacy's Meeting Abstracts supplement.

  3. Level of Service Program for INDOT Operations : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    In 2008 the JTRP study SPR-3130, Performance Based : Contracting for Roadway Maintenance Operations, : revealed the state agencies that have developed a : Level of Service (LOS) program benefit. A LOS program : can evaluate and determine maintenance ...

  4. Software Maintenance of the Subway Environment Simulation Computer Program

    DOT National Transportation Integrated Search

    1980-12-01

    This document summarizes the software maintenance activities performed to support the Subway Environment Simulation (SES) Computer Program. The SES computer program is a design-oriented analytic tool developed during a recent five-year research proje...

  5. Miramar College Program Evaluation: Aviation Maintenance.

    ERIC Educational Resources Information Center

    Moriyama, Bruce; Brumley, Leslie

    Qualitative and quantitative data are presented in this evaluation of the curricular, personnel, and financial status of Miramar College's program in aviation maintenance. The report first provides the results of an interview with the program chairperson, which sought information on program objectives and goals and their determination, the extent…

  6. Building Maintenance and Utilities Management. Florida Vocational Program Guide.

    ERIC Educational Resources Information Center

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance and utilities management program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary…

  7. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    PubMed

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  8. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    PubMed Central

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices. PMID:27195666

  9. The evolution of Medicare financing policy for graduate medical education and implications for PM&R: a commentary.

    PubMed

    Verville, R; DeLisa, J A

    2001-04-01

    Currently, the only explicit payers for graduate medical education (GME) in the United States are the federal and state governments. Of these, Medicare is by far the largest and most predictable payer. Through the prospective payment system, Medicare reimburses teaching institutions for both their direct and indirect costs associated with their GME programs. Because a well-educated workforce benefits patients covered by private, as well as public insurance, various proposals have been advanced to establish an all-payer pool to distribute the financial burden more equitably. Furthermore, Medicare policy affects physician supply. There is increasing recognition of potential physician oversupply, raising policy questions about the government's longstanding support of GME. In comparison with other specialties, physical medical and rehabilitation (PM&R) may receive more favorable treatment under future GME funding plans, for 2 reasons. First, under the formulas used by Medicare, PM&R training slots typically bring in more indirect revenue to teaching hospitals than is consumed in indirect expenses. This makes PM&R a relatively more attractive program to retain in the face of mandated reductions in training slots. Second, in many parts of the country, PM&R is not threatened by oversupply, making cuts less likely. Nevertheless, the high percentage of non-US medical graduates entering PM&R training may make the specialty vulnerable to future reductions in funded training slots.

  10. Communicating Risk to Program Managers

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  11. Level of Service Program for INDOT Operations : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    In 2008 the JTRP study SPR-3130, Performance Based Contracting for Roadway Maintenance Operations, revealed the state agencies that have developed a Level of Service (LOS) program benefit. A LOS program can evaluate and determine maintenance performa...

  12. Navy Occupational Health Information Management System (NOHIMS). System-Wide Module. Program Maintenance Manual

    DTIC Science & Technology

    1987-06-01

    NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOHIMS SYSTEM-WIDE MODULE PROGRAM MAINTENANCE MANUAL JUNE 1987 DTIC 00 SEP I 21988DJ 0) 4... INFORMATION MANAGEMENT SYSTEM (NOHIMS) N 1.98 SYSTEM-WIDE MODULE PROGRAM MAINTENANCE MANUAL 7. Author(s) a. Performing Organization Rapt. No. MITRE... Management System (NOHIMS). NORIMS, whose initial version was ,eveloped at the Naval Health Research Center (NHRC), is a composite of 4 -’o subsystems: an

  13. 25 CFR 170.2 - What is the IRR Program and BIA Road Maintenance Program policy?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false What is the IRR Program and BIA Road Maintenance Program policy? 170.2 Section 170.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Policies, Applicability, and Definitions § 170.2 What is the IRR Program...

  14. 48 CFR 301.607-72 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction capital investment acquisitions. Consistent with OFPP guidance, HHS requires FAC-P/PM Level III certification for Program and Project Managers responsible for major IT and construction capital investments—i.e... capital investment. Also, HHS requires that an individual obtain FAC-P/PM Level II or I certification for...

  15. 76 FR 50811 - Seventeenth Meeting: EUROCAE WG-72: RTCA Special Committee 216: Aeronautical Systems Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    .... Agenda Tuesday, September 6th (Pre-Meeting Events) 9 a.m. to 12 p.m. Optional--DHS National Cybersecurity... cooperation. 11:15 a.m.-12 p.m., DHS Briefing on the Cybersecurity Control System Security (CSSP) Program. 1 p...

  16. Y-12 Groundwater Protection Program CY2012 Triennial Report Of The Monitoring Well Inspection And Maintenance Program Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-09-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspections completed by the GWPP on active and inactive wells at Y-12 during calendar years (CY) 2010 through 2012. In addition, this report also documents well inspections performed under the Y-12 Water Resources Restoration Program, which is administered by URS|CH2M Oak Ridge (UCOR). This report documents well maintenance activities completed since the last triennial inspection event (CY 2009); and provides summary tablesmore » of well inspections and well maintenance activities during the reference time period.« less

  17. Honolulu Community College Program Health Indicators: 2000-2001 Program Reviews.

    ERIC Educational Resources Information Center

    Hawaii Univ., Honolulu. Honolulu Community Coll.

    This report presents an overall health summation of 21 programs offered at Honolulu Community College (Hawaii) during 2000-2001. The programs profiled are: (1) Auto Body Repair and Painting; (2) Aeronautics Maintenance Technology; (3) Administration of Justice; (4) Automotive Mechanics Technology; (5) Boat Maintenance Repair; (6) Carpentry; (7)…

  18. Application of the dual-component model of working memory to ADHD:Greater secondary memory deficit despite confounded cognitive differences.

    PubMed

    Gibson, Bradley S; Gondoli, Dawn M; Ralph, Kathryn J; Sztybel, Pedro

    2018-01-01

    The dual-component model postulates that working memory capacity consists of two dissociable components: maintenance in primary memory (PM) and retrieval from secondary memory (SM). Recent application of this model to attention-deficit/hyperactivity disorder (ADHD) has revealed that the SM component is more deficient than the PM component across both verbal and spatial modalities. The present study attempts to strengthen this conclusion by addressing two weaknesses in the previous study. First, the present study shows that the SM component continues to be more deficient than the PM component across both modalities under conditions in which (1) all participants were instructed to use the same recall strategy (resulting in the exclusion of fewer participants); and, (2) individual differences in this strategy were controlled. Second, the present study also documents a group difference in word reading efficiency that is confounded with diagnostic status and that might have influenced estimates of PM and SM capacities in the verbal modality. However, although the SM component is more deficient than the PM component in the ADHD group, the magnitude of this interaction does not vary as a function task modality. These findings are interpreted to suggest that the pattern of WM deficiencies observed are part of a causal pathway that can lead to the symptoms of ADHD, as well as to impairments in reading (and intelligence) due to overlapping cue-dependent retrieval mechanisms. These findings provide additional support for the notion that the SM component of WM is an important and neglected target for treatment.

  19. Manned/Unmanned Common Architecture Program (MCAP) net centric flight tests

    NASA Astrophysics Data System (ADS)

    Johnson, Dale

    2009-04-01

    Properly architected avionics systems can reduce the costs of periodic functional improvements, maintenance, and obsolescence. With this in mind, the U.S. Army Aviation Applied Technology Directorate (AATD) initiated the Manned/Unmanned Common Architecture Program (MCAP) in 2003 to develop an affordable, high-performance embedded mission processing architecture for potential application to multiple aviation platforms. MCAP analyzed Army helicopter and unmanned air vehicle (UAV) missions, identified supporting subsystems, surveyed advanced hardware and software technologies, and defined computational infrastructure technical requirements. The project selected a set of modular open systems standards and market-driven commercial-off-theshelf (COTS) electronics and software, and, developed experimental mission processors, network architectures, and software infrastructures supporting the integration of new capabilities, interoperability, and life cycle cost reductions. MCAP integrated the new mission processing architecture into an AH-64D Apache Longbow and participated in Future Combat Systems (FCS) network-centric operations field experiments in 2006 and 2007 at White Sands Missile Range (WSMR), New Mexico and at the Nevada Test and Training Range (NTTR) in 2008. The MCAP Apache also participated in PM C4ISR On-the-Move (OTM) Capstone Experiments 2007 (E07) and 2008 (E08) at Ft. Dix, NJ and conducted Mesa, Arizona local area flight tests in December 2005, February 2006, and June 2008.

  20. KSC00pp0489

    NASA Image and Video Library

    2000-04-11

    KENNEDY SPACE CENTER, FLA. -- Two GetAway Special (GAS) experiments SEM-06 (left) and MARS (right), part of the payload on mission STS-101, are seen here in the payload bay of Space Shuttle Atlantis prior to door closure. The SEM program is student-developed, focusing on the science of zero-gravity and microgravity. Selected student experiments on this sixth venture are testing the effects of space on Idaho tubers, seeds, paint, yeast, film, liquids, electronics and magnetic chips. MARS is the name for part of the KSC Space Life Sciences Outreach Program. It includes 20 participating schools (ranging from elementary to high school) from all over the nation and one in Canada who have been involved in KSC Space Life Sciences projects over the past seven years. The MARS payload has 20 tubes filled with materials for various classroom investigations designed by the MARS schools. The primary mission of STS-101 is to deliver logistics and supplies to the International Space Station, plus prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. The crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A

  1. KSC-00pp0489

    NASA Image and Video Library

    2000-04-11

    KENNEDY SPACE CENTER, FLA. -- Two GetAway Special (GAS) experiments SEM-06 (left) and MARS (right), part of the payload on mission STS-101, are seen here in the payload bay of Space Shuttle Atlantis prior to door closure. The SEM program is student-developed, focusing on the science of zero-gravity and microgravity. Selected student experiments on this sixth venture are testing the effects of space on Idaho tubers, seeds, paint, yeast, film, liquids, electronics and magnetic chips. MARS is the name for part of the KSC Space Life Sciences Outreach Program. It includes 20 participating schools (ranging from elementary to high school) from all over the nation and one in Canada who have been involved in KSC Space Life Sciences projects over the past seven years. The MARS payload has 20 tubes filled with materials for various classroom investigations designed by the MARS schools. The primary mission of STS-101 is to deliver logistics and supplies to the International Space Station, plus prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. The crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A

  2. KSC00pp0494

    NASA Image and Video Library

    2000-04-11

    KENNEDY SPACE CENTER, FLA. -- Placed at the end of Space Shuttle Atlantis' payload bay are two GetAway Special (GAS) experiments, MARS (left) and SEM-06 (right). MARS is the name for part of the KSC Space Life Sciences Outreach Program. It includes 20 participating schools (ranging from elementary to high school) from all over the nation and one in Canada who have been involved in KSC Space Life Sciences projects over the past seven years. The MARS payload has 20 tubes filled with materials for various classroom investigations designed by the MARS schools. The SEM program is student-developed, focusing on the science of zero-gravity and microgravity. Selected student experiments on this sixth venture are testing the effects of space on Idaho tubers, seeds, paint, yeast, film, liquids, electronics and magnetic chips. The primary mission of STS-101 is to deliver logistics and supplies to the International Space Station, plus prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. The crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A

  3. KSC-00pp0494

    NASA Image and Video Library

    2000-04-11

    KENNEDY SPACE CENTER, FLA. -- Placed at the end of Space Shuttle Atlantis' payload bay are two GetAway Special (GAS) experiments, MARS (left) and SEM-06 (right). MARS is the name for part of the KSC Space Life Sciences Outreach Program. It includes 20 participating schools (ranging from elementary to high school) from all over the nation and one in Canada who have been involved in KSC Space Life Sciences projects over the past seven years. The MARS payload has 20 tubes filled with materials for various classroom investigations designed by the MARS schools. The SEM program is student-developed, focusing on the science of zero-gravity and microgravity. Selected student experiments on this sixth venture are testing the effects of space on Idaho tubers, seeds, paint, yeast, film, liquids, electronics and magnetic chips. The primary mission of STS-101 is to deliver logistics and supplies to the International Space Station, plus prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. The crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A

  4. Development of the salt-reduction and efficacy-maintenance program in Indonesia.

    PubMed

    Irwan, Andi Masyitha; Kato, Mayumi; Kitaoka, Kazuyo; Ueno, Eiichi; Tsujiguchi, Hiromasa; Shogenji, Miho

    2016-12-01

    We conducted a randomized, controlled trial to examine the effects of a salt-reduction and efficacy-maintenance program on the improvement and maintenance of self-care and self-efficacy in reducing the salt intake of older people with high blood pressure. A total of 51 participants with hypertension/prehypertension in Indonesia were randomly assigned to a control group or one of two intervention groups: salt-reduction training or salt-reduction and efficacy-maintenance. The salt-reduction and efficacy-maintenance group received educational training and a maintenance meeting; the participants' knowledge, attitudes, self-care practices, and self-efficacy significantly improved after training and were maintained after the maintenance meeting. Participants in the salt-reduction training group showed significant effects for the same variables; however, their food salt concentrations rebounded after the maintenance meeting. No significant improvement was found in the control group. The salt-reduction and efficacy-maintenance group participants reported positive effects of salt reduction and different practices based on who prepared their meals. The salt-reduction and efficacy-maintenance group program was effective in improving and maintaining knowledge, attitudes, and self-efficacy of salt-reduction practices and could be applied with community-dwelling older people with high blood pressure. © 2016 John Wiley & Sons Australia, Ltd.

  5. Office of the Under Secretary of Defense (Comptroller)

    Science.gov Websites

    Estimates for FY 2019 (Green Book) PDF icon Excel icon (Zip File) Operations and Maintenance Overview Operation and Maintenance Overview PDF icon Budget Documents Military Personnel Programs (M-1) PDF icon Excel icon - Budget Appendix Display (M-1) Excel icon Operation and Maintenance Programs (O-1) PDF icon

  6. Managing Highway Maintenance: Budget Preparation, Unit 9, Level 3.

    ERIC Educational Resources Information Center

    Federal Highway Administration (DOT), Washington, DC. Offices of Research and Development.

    Part of the series "Managing Highway Maintenance," the unit describes the essential steps in developing a maintenance budget, or performance budget, based on the work to be done. It is designed for field engineers and supervisors who assist department officials in preparing work programs and budgets. The format is a programed,…

  7. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false General Principles of Reliability-Based... STANDARDS Pt. 238, App. E Appendix E to Part 238—General Principles of Reliability-Based Maintenance... maintenance programs are based on the following general principles. A failure is an unsatisfactory condition...

  8. 41 CFR 102-193.10 - What are the goals of the Federal Records Management Program?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ADMINISTRATIVE PROGRAMS 193-CREATION, MAINTENANCE, AND USE OF RECORDS § 102-193.10 What are the goals of the... maintenance of management controls that prevent the creation of unnecessary records and promote effective and... creation, maintenance, and use. (e) Judicious preservation and disposal of records. (f) Direction of...

  9. 41 CFR 102-193.10 - What are the goals of the Federal Records Management Program?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ADMINISTRATIVE PROGRAMS 193-CREATION, MAINTENANCE, AND USE OF RECORDS § 102-193.10 What are the goals of the... maintenance of management controls that prevent the creation of unnecessary records and promote effective and... creation, maintenance, and use. (e) Judicious preservation and disposal of records. (f) Direction of...

  10. 41 CFR 102-193.10 - What are the goals of the Federal Records Management Program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ADMINISTRATIVE PROGRAMS 193-CREATION, MAINTENANCE, AND USE OF RECORDS § 102-193.10 What are the goals of the... maintenance of management controls that prevent the creation of unnecessary records and promote effective and... creation, maintenance, and use. (e) Judicious preservation and disposal of records. (f) Direction of...

  11. 41 CFR 102-193.10 - What are the goals of the Federal Records Management Program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ADMINISTRATIVE PROGRAMS 193-CREATION, MAINTENANCE, AND USE OF RECORDS § 102-193.10 What are the goals of the... maintenance of management controls that prevent the creation of unnecessary records and promote effective and... creation, maintenance, and use. (e) Judicious preservation and disposal of records. (f) Direction of...

  12. Operation and Maintenance of Wastewater Collection Systems. Volume I. Third Edition. A Field Study Training Program.

    ERIC Educational Resources Information Center

    California State Univ., Sacramento. Dept. of Civil Engineering.

    Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…

  13. Qualitative Analysis for Maintenance Process Assessment

    NASA Technical Reports Server (NTRS)

    Brand, Lionel; Kim, Yong-Mi; Melo, Walcelio; Seaman, Carolyn; Basili, Victor

    1996-01-01

    In order to improve software maintenance processes, we first need to be able to characterize and assess them. These tasks must be performed in depth and with objectivity since the problems are complex. One approach is to set up a measurement-based software process improvement program specifically aimed at maintenance. However, establishing a measurement program requires that one understands the problems to be addressed by the measurement program and is able to characterize the maintenance environment and processes in order to collect suitable and cost-effective data. Also, enacting such a program and getting usable data sets takes time. A short term substitute is therefore needed. We propose in this paper a characterization process aimed specifically at maintenance and based on a general qualitative analysis methodology. This process is rigorously defined in order to be repeatable and usable by people who are not acquainted with such analysis procedures. A basic feature of our approach is that actual implemented software changes are analyzed in order to understand the flaws in the maintenance process. Guidelines are provided and a case study is shown that demonstrates the usefulness of the approach.

  14. Advanced receptor modelling for the apportionment of road dust resuspension to atmospheric PM

    NASA Astrophysics Data System (ADS)

    Amato, F.; Pandolfi, M.; Escrig, A.; Querol, X.; Alastuey, A.; Pey, J.; Perez, N.; Hopke, P. K.

    2009-04-01

    Fugitive emissions from traffic resuspension can often represent an important source of atmospheric particulate matter in urban environments, especially when the scarce precipitations favour the accumulation of road dust. Resuspension of road dust can lead to high exposures to heavy metals, metalloids and mineral matter. Knowing the amount of its contribution to atmospheric PM is a key task for establishing eventual mitigation or preventive measures. Factor analysis techniques are widely used tools for atmospheric aerosol source apportionment, based on the mass conservation principle. Paatero and Tapper (1993) suggested the use of a Weighted Least Squares scheme with the aim of obtaining a minimum variance solution. Additionally they proposed to incorporate the basic physical constraint of non negativity, calling their approach Positive Matrix Factorization (PMF), which can be performed by the program PMF2 released by Paatero (1997). Nevertheless, Positive Matrix Factorization can be either solved with the Multilinear Engine (ME-2), a more flexible program, also developed by Paatero (1999), which can solve any model consisting in sum of products of unknowns. The main difference with PMF2 is that ME-2 does not solve only well-defined tasks, but its actions are defined in a "script file" written in a special-purpose programming language, allowing incorporating additional tasks such as data processing etc. Thus in ME-2 a priori information, e.g. chemical fingerprints can be included as auxiliary terms of the object function to be minimized. This feature of ME-2 make it especially suitable for source apportionment studies where some knowledge (chemical ratios, profiles, mass conservation etc) of involved sources is available. The aim of this study was to quantify the contribution of road dust resuspension in PM10, PM2.5 and PM1 data set from Barcelona (Spain). Given that recently the emission profile of local road dust was characterized (Amato et al., in press), authors show how to apply in ME-2 this knowledge to obtain a quantitative assessment of this source. The achievement of this objective permitted to show how is possible to improve a basic solution of PMF2 basing on an extended model. Results show that road dust resuspension accounted for 6.7 µg/m3 (16%) in PM10, 2.2 µg/m3 (8%) of PM2.5 and 0.3 µg/m3 (1%) of PM1, revealing that fugitive emissions were responsible of the 36%, 18% and 2% of total traffic emissions respectively in PM10, PM2.5 and PM1. Acknowledments: This work was funded by the Spanish Ministry of Science and Innovation (GRACCIE-SCD2007-00067)

  15. Photosynthetic capacity and water use efficiency in Ricinus communis (L.) under drought stress in semi-humid and semi-arid areas.

    PubMed

    Santos, Claudiana M Dos; Endres, Laurício; Ferreira, Vilma M; Silva, José V; Rolim, Eduardo V; Wanderley, Humberto C L

    2017-01-01

    Castor bean is one of the crops with potential to provide raw material for production of oils for biodiesel. This species possess adaptive mechanisms for maintaining the water status when subjected to drought stress. A better understanding these mechanisms under field conditions can unravel the survival strategies used by this species. This study aimed to compare the physiological adaptations of Ricinus communis (L.) in two regions with different climates, the semi-arid and semi-humid subject to water stress. The plants showed greater vapor pressure deficit during the driest hours of the day, which contributed to higher values of the leaf temperature and leaf transpiration, however, the VPD(leaf-air) had the greatest effect on plants in the semi-arid region. In both regions, between 12:00 p.m. and 2:00 p.m., the plants presented reduction in the rates of photosynthesis and intracellular CO2 concentration in response to stomatal closure. During the dry season in the semi-arid region, photoinhibition occurred in the leaves of castor bean between 12:00 p.m. and 2:00 p.m. These results suggest that castor bean plants possess compensatory mechanisms for drought tolerance, such as: higher stomatal control and maintenance of photosynthetic capacity, allowing the plant to survive well in soil with low water availability.

  16. The forecasting research of early warning systems for atmospheric pollutants: A case in Yangtze River Delta region

    NASA Astrophysics Data System (ADS)

    Song, Yiliao; Qin, Shanshan; Qu, Jiansheng; Liu, Feng

    2015-10-01

    The issue of air quality regarding PM pollution levels in China is a focus of public attention. To address that issue, to date, a series of studies is in progress, including PM monitoring programs, PM source apportionment, and the enactment of new ambient air quality index standards. However, related research concerning computer modeling for PM future trends estimation is rare, despite its significance to forecasting and early warning systems. Thereby, a study regarding deterministic and interval forecasts of PM is performed. In this study, data on hourly and 12 h-averaged air pollutants are applied to forecast PM concentrations within the Yangtze River Delta (YRD) region of China. The characteristics of PM emissions have been primarily examined and analyzed using different distribution functions. To improve the distribution fitting that is crucial for estimating PM levels, an artificial intelligence algorithm is incorporated to select the optimal parameters. Following that step, an ANF model is used to conduct deterministic forecasts of PM. With the identified distributions and deterministic forecasts, different levels of PM intervals are estimated. The results indicate that the lognormal or gamma distributions are highly representative of the recorded PM data with a goodness-of-fit R2 of approximately 0.998. Furthermore, the results of the evaluation metrics (MSE, MAPE and CP, AW) also show high accuracy within the deterministic and interval forecasts of PM, indicating that this method enables the informative and effective quantification of future PM trends.

  17. Orbital Solutions and Absolute Elements of the W UMa Binary MW Pavonis

    NASA Astrophysics Data System (ADS)

    Alvarez, Gabriella E.; Sowell, James R.; Williamon, Richard M.; Lapasset, Emilio

    2015-08-01

    We present differential $UBV$ photoelectric photometry obtained by Williamon of the short-period A-type W~UMa binary MW~Pav. With the Wilson-Devinney analysis program we obtained a simultaneous solution of these observations with the $UBV$ photometry of Lapasset (1977,1980), the $V$ measurements by the $ASAS$ program, and the double-lined radial velocity measurements of Rucinski & Duerbeck (2006). Our solution indicates that MW~Pav is in an overcontact state, where both components exceed their critical Roche lobes. We derive masses of $M_1 = 1.514 \\pm 0.063 \\, M_\\sun$ and $M_2 = 0.327 \\pm 0.014 \\, M_\\sun$, and equal-volume radii of $R_1 = 2.412 \\pm 0.034 \\, R_\\sun$ and $R_2 = 1.277 \\pm 0.019 \\, R_\\sun$ for the primary and secondary, respectively. The system is assumed to have a circular orbit and is seen at an inclination of $86.39\\arcdeg \\pm 0.63\\arcdeg$. The effective temperature of the primary was held fixed at $6900$~K, whereas the secondary's temperature was found to be $6969 \\pm 10$~K. The asymmetry of the light curves requires a large, single star spot on the smaller, less massive secondary component. A consistent base solution, with different spot characteristics for the Williamon, Lapasset, and $ASAS$ data, was found. The modeled spot varied little during the 40-year range of photometric observations. The combined solution utilized a third light component and found that the period is changing at a rate of dP/dt~=~$(6.50 \\pm 0.19) \\times 10^{-10}$.

  18. Prenatal and postnatal mothering by diesel exhaust PM2.5-exposed dams differentially program mouse energy metabolism.

    PubMed

    Chen, Minjie; Liang, Shuai; Zhou, Huifen; Xu, Yanyi; Qin, Xiaobo; Hu, Ziying; Wang, Xiaoke; Qiu, Lianglin; Wang, Wanjun; Zhang, Yuhao; Ying, Zhekang

    2017-01-18

    Obesity is one of the leading threats to global public health. It is consequent to abnormal energy metabolism. Currently, it has been well established that maternal exposure to environmental stressors that cause inappropriate fetal development may have long-term adverse effects on offspring energy metabolism in an exposure timing-dependent manner, known as developmental programming of health and diseases paradigm. Rapidly increasing evidence has indicated that maternal exposure to ambient fine particles (PM 2.5 ) correlates to abnormal fetal development. In the present study, we therefore assessed whether maternal exposure to diesel exhaust PM 2.5 (DEP), the major component of ambient PM 2.5 in urban areas, programs offspring energy metabolism, and further examined how the timing of exposure impacts this programming. The growth trajectory of offspring shows that although prenatal maternal exposure to DEP did not impact the birth weight of offspring, it significantly decreased offspring body weight from postnatal week 2 until the end of observation. This weight loss effect of prenatal maternal exposure to DEP coincided with decreased food intake but not alteration in brown adipose tissue (BAT) morphology. The hypophagic effect of prenatal maternal exposure to DEP was in concord with decreased hypothalamic expression of an orexigenic peptide NPY, suggesting that the prenatal maternal exposure to DEP impacts offspring energy balance primarily through programming of food intake. Paradoxically, the reduced body weight resulted from prenatal maternal exposure to DEP was accompanied by increased mass of epididymal adipose tissue, which was due to hyperplasia as morphological analysis did not observe any hypertrophy. In direct contrast, the postnatal mothering by DEP-exposed dams increased offspring body weight during lactation and adulthood, paralleled by markedly increased fat accumulation and decreased UCP1 expression in BAT but not alteration in food intake. The weight gain induced by postnatal mothering by DEP-exposed dams was also expressed as an increased adiposity. But it concurred with a marked hypertrophy of adipocytes. Prenatal and postnatal mothering by DEP-exposed dams differentially program offspring energy metabolism, underscoring consideration of the exposure timing when examining the adverse effects of maternal exposure to ambient PM 2.5 .

  19. Quantifying road dust resuspension in urban environment by Multilinear Engine: A comparison with PMF2

    NASA Astrophysics Data System (ADS)

    Amato, F.; Pandolfi, M.; Escrig, A.; Querol, X.; Alastuey, A.; Pey, J.; Perez, N.; Hopke, P. K.

    Atmospheric PM pollution from traffic comprises not only direct emissions but also non-exhaust emissions because resuspension of road dust that can produce high human exposure to heavy metals, metalloids, and mineral matter. A key task for establishing mitigation or preventive measures is estimating the contribution of road dust resuspension to the atmospheric PM mixture. Several source apportionment studies, applying receptor modeling at urban background sites, have shown the difficulty in identifying a road dust source separately from other mineral sources or vehicular exhausts. The Multilinear Engine (ME-2) is a computer program that can solve the Positive Matrix Factorization (PMF) problem. ME-2 uses a programming language permitting the solution to be guided toward some possible targets that can be derived from a priori knowledge of sources (chemical profile, ratios, etc.). This feature makes it especially suitable for source apportionment studies where partial knowledge of the sources is available. In the present study ME-2 was applied to data from an urban background site of Barcelona (Spain) to quantify the contribution of road dust resuspension to PM 10 and PM 2.5 concentrations. Given that recently the emission profile of local resuspended road dust was obtained (Amato, F., Pandolfi, M., Viana, M., Querol, X., Alastuey, A., Moreno, T., 2009. Spatial and chemical patterns of PM 10 in road dust deposited in urban environment. Atmospheric Environment 43 (9), 1650-1659), such a priori information was introduced in the model as auxiliary terms of the object function to be minimized by the implementation of the so-called "pulling equations". ME-2 permitted to enhance the basic PMF solution (obtained by PMF2) identifying, beside the seven sources of PMF2, the road dust source which accounted for 6.9 μg m -3 (17%) in PM 10, 2.2 μg m -3 (8%) of PM 2.5 and 0.3 μg m -3 (2%) of PM 1. This reveals that resuspension was responsible of the 37%, 15% and 3% of total traffic emissions respectively in PM 10, PM 2.5 and PM 1. Therefore the overall traffic contribution resulted in 18 μg m -3 (46%) in PM 10, 14 μg m -3 (51%) in PM 2.5 and 8 μg m -3 (48%) in PM 1. In PMF2 this mass explained by road dust resuspension was redistributed among the rest of sources, increasing mostly the mineral, secondary nitrate and aged sea salt contributions.

  20. Detection and Measurement of Unhealthy, Environment-Derived Aerosol Materials in an Emergency Department.

    PubMed

    Choi, Bryan Y; Kobayashi, Leo; Pathania, Shivany; Miller, Courtney B; Locke, Emma R; Stearns, Branden C; Hudepohl, Nathan J; Patefield, Scott S; Suner, Selim; Williams, Kenneth A; Machan, Jason T; Jay, Gregory D

    2015-01-01

    To measure unhealthy aerosol materials in an Emergency Department (ED) and identify their sources for mitigation efforts. Based on pilot findings of elevated ED particulate matter (PM) levels, investigators hypothesized that unhealthy aerosol materials derive from exogenous (vehicular) sources at ambulance receiving entrances. The Aerosol Environmental Toxicity in Healthcare-related Exposure and Risk program was conducted as an observational study. Calibrated sensors monitored PM and toxic gases at Ambulance Triage Exterior (ATE), Ambulance Triage Desk (ATD), and control Public Triage Desk (PTD) on a 3/3/3-day cycle. Cassette sampling characterized PM; meteorological and ambulance traffic data were logged. Descriptive and multiple linear regression analyses assessed for interactions between aerosol material levels, location, temporal variables, ambulance activity, and meteorological factors. Sensors acquired 93,682 PM0.3, 90,250 PM2.5, and 93,768 PM5 measurements over 366 days to generate a data set representing at least 85.6% of planned measurements. PM0.3, PM2.5, and PM5 mean counts were lowest in PTD; 56%, 224%, and 223% higher in ATD; and 996%, 200%, and 63% higher in ATE, respectively (all p < .001). Qualitative analyses showed similar PM compositions in ATD and ATE. On multiple linear regression analysis, PM0.3 counts correlated primarily with location; PM2.5 and PM5 counts correlated most strongly with location and ambulance presence. PM < 2.5 and toxic gas concentrations at ATD and PTD patient care areas did not exceed hazard levels; PM0.3 counts did not have formal safety thresholds for comparison. Higher levels of PM were linked with ED ambulance areas, although their health impact is unclear. © The Author(s) 2015.

  1. Hybrid Particle Swarm Optimization for Hybrid Flowshop Scheduling Problem with Maintenance Activities

    PubMed Central

    Li, Jun-qing; Pan, Quan-ke; Mao, Kun

    2014-01-01

    A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm. PMID:24883414

  2. Strategic Planning: Shaping Future Success

    DTIC Science & Technology

    2016-09-01

    fielding, the PM may also be planning for future increments , sustainment and other long-term ef- forts. Strategic planning can help the PM position these...introduced the Planning, Programming, and Budgeting System (PPBS) to the DoD. Prior to that, the DoD’s budget - ing focused on areas such as overhead

  3. 78 FR 36555 - National Library of Medicine; Notice of Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ..., MD 20892. Open: 2:00 p.m. to 3:00 p.m. Agenda: Program Discussion. Place: National Library of... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine... Biotechnology Information. The meetings will be open to the public as indicated below, with attendance limited...

  4. PM 2.5 CHEMICAL SPECIATION SAMPLER EVALUATION FIELD PROGRAM: RESULTS FROM THE FOUR CITY STUDY

    EPA Science Inventory

    The objective of this sampler intercomparison field study is to determine the performance characteristics for the collection of the chemical components of PM2.5 by the chemical speciation monitors developed for the national network relative to each other, to the Federal Referen...

  5. 40 CFR 52.634 - Particulate matter (PM-10) Group III SIP.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Particulate matter (PM-10) Group III SIP. 52.634 Section 52.634 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.634 Particulate matter...

  6. 40 CFR 52.146 - Particulate matter (PM-10) Group II SIP commitments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Particulate matter (PM-10) Group II SIP commitments. 52.146 Section 52.146 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.146 Particulate matter...

  7. 75 FR 21640 - National Cancer Institute; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ..., Resources and Training Review Branch, Division of Extramural Activities, National Cancer Institute, 6116....D., PhD, Scientific Review Officer, Research Programs Review Branch, Division of Extramural... & Tissue Biology P01. Date: May 26-28, 2010. Time: 5 p.m. to 5 p.m. Agenda: To review and evaluate grant...

  8. 76 FR 14675 - National Cancer Institute; Notice of Closed Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... Biology. Date: May 16-18, 2011. Time: 4 p.m. to 5 p.m. Agenda: To review and evaluate grant applications... Branch, Division of Extramural Activities, National Cancer Institute, NIH, 6116 Executive Boulevard, Room.... Wirth, PhD, Scientific Review Officer, Research Programs Review Branch, Division of Extramural...

  9. INTEGRATED LABORATORY AND FIELD CHARACTERIZATION OF ORGANIC CARBON IN PM 2.5 FORMED THROUGH CHEMICAL REACTIONS

    EPA Science Inventory

    An integrated laboratory and field research program is underway at the National Exposure Research Laboratory (NERL) to characterize organic carbon in PM2.5 (particulate matter) formed through chemical reactions. Information from this study will provide critical data ne...

  10. 78 FR 37200 - Plant Variety Protection Board; Open Teleconference Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [Document No. AMS-ST-13-0019] Plant... an open meeting of the Plant Variety Protection Board. DATES: July 31, 2013 2:00 p.m. to 4:00 p.m... CONTACT: Ms. Jennifer Banks, Plant Variety Protection Office, Science and Technology Programs...

  11. ANALYSIS OF LEAD IN CANDLE PARTICULATE EMISSIONS BY XRF USING UNIQUANT 4

    EPA Science Inventory

    As part of an extensive program to study the small combustion sources of indoor fine particulate matter (PM), candles with lead-core wicks were burned in a 46-L glass flow- through chamber. The particulate emissions with aerodynamic diameters <10 micrometers (PM10) were captured ...

  12. INTERLABORATORY COMPARISON STUDIES FOR CHARACTERIZATION OF ORGANIC COMPOUNDS IN PARTICULATE MATTER

    EPA Science Inventory

    A working group of investigators, who are characterizing and quantifying the organic compounds in particulate matter (PM) as part of the US EPA's PM 2.5 research program and related studies, was established three years ago to advance the quality and comparability of data on the...

  13. SIAM Conference on Applied Geometry Held in Albany, New York on 20-24 July 1987.

    DTIC Science & Technology

    1987-11-01

    Pasta rooms during lectures. Thank you. Primavera. Carved Roast Beef. Baked Ocean White Fish. Garden Vegetables) can only promise to be the makings of a...distributed upon check-in. __ - . ~.- ~ -- I.. ~PROGRAM a 8:30 AM Motion Planning - . J Gordon Wilfong 10:00 AM Coffee 10:30 AM Surfaces in...Computer Vion 4 1- 1 Paul Beal 12:00 PM Lunch 1:30 PM Computational Issues in Solid * - -. Boundary Evaluation. Rida Farouki 3:00 PM Coffee L~2 - ~ ~ .3:30

  14. A Request for the Conference and Symposia Grant from COMP Division of American Chemical Society

    DTIC Science & Technology

    2015-03-02

    John Kattirtzi, Joost VandeVondele, Jun Cheng. 4:45 pm 130 Oxidation stability and decomposition reactions of battery electrolytes and additives in bulk...CA Abstracts2View™: http://abstracts.acs.org/chem/248nm/program/divisionindex.php?act=pre... 3 of 5 8/26/2014 8:19 PM 11:10 am 420 DME decomposition ...Nature of electro-osmosis in hydrated polymer electrolyte membranes Yoong-Kee Choe 5:25 pm Concluding Remarks COMP Emilio Esposito, Scott Wildman

  15. HST Proper Motions of Distant Globular Clusters: Constraining the Formation & Mass of the Milky Way

    NASA Astrophysics Data System (ADS)

    Sohn, S. Tony; van der Marel, Roeland P.; Deason, Alis; Bellini, Andrea; Besla, Gurtina; Watkins, Laura

    2018-04-01

    Proper motions (PMs) are required to calculate accurate orbits of globular clusters (GCs) in the Milky Way (MW) halo. We present our HST program to create a PM database for 20 GCs at distances of R GC = 10-100 kpc. Targets are discussed along with PM measurement methods. We also describe how our PM results can be used for Gaia as an external check, and discuss the synergy between HST and Gaia as astrometric instruments in the coming years.

  16. The economics of satellite maintenance

    NASA Technical Reports Server (NTRS)

    Derocher, W. L., Jr.; Sosnay, R. G.

    1975-01-01

    The primary goal of the space transportation system - to reduce the cost of space programs while satisfying their mission requirements - can be enhanced by the proper choice of a satellite-maintenance concept. This paper develops the life-cycle costs of performing an automated satellite program during the shuttle era in three competitive modes: expendable, ground-refurbishable, and in-orbit maintainable. In-orbit maintenance is shown to be the most economic maintenance mode for both low- and high-earth orbits.

  17. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fresco, A.; Subudhi, M.; Gunther, W.

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance,more » Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.« less

  18. Maintenance: Two Views.

    ERIC Educational Resources Information Center

    Ballard, J. Barry; Burdette, Clarence E.

    1987-01-01

    Presents two viewpoints on the question of using funding from the Vocational Education Act to maintain ongoing vocational programs. Ballard argues that programs have improved qualitatively because of additional program improvement monies, whereas Burdette argues that the ban on using funds for maintenance treats some states unfairly. (CH)

  19. The Effects of Beacons, Comments, and Tasks on Program Comprehension Process in Software Maintenance

    ERIC Educational Resources Information Center

    Fan, Quyin

    2010-01-01

    Program comprehension is the most important and frequent process in software maintenance. Extensive research has found that individual characteristics of programmers, differences of computer programs, and differences of task-driven motivations are the major factors that affect the program comprehension results. There is no study specifically…

  20. Alcohol Advertising in Sport and Non-Sport TV in Australia, during Children's Viewing Times.

    PubMed

    O'Brien, Kerry S; Carr, Sherilene; Ferris, Jason; Room, Robin; Miller, Peter; Livingston, Michael; Kypri, Kypros; Lynott, Dermot

    2015-01-01

    Estimate the amount of alcohol advertising in sport vs. non-sport programming in Australian free-to-air TV and identify children's viewing audience composition at different times of the day. Alcohol advertising and TV viewing audience data were purchased for free-to-air sport and non-sport TV in Australia for 2012. We counted alcohol advertisements in sport and non-sport TV in daytime (6 am-8.29 pm) and evening periods (8.30 pm-11.59 pm) and estimated viewing audiences for children and young adults (0-4 years, 5-13 years, 14-17 years, 18-29 years). During the daytime, most of the alcohol advertising (87%) was on sport TV. In the evening, most alcohol advertising (86%) was in non-sport TV. There was little difference in the mean number of children (0-17 years) viewing TV in the evening (N = 273,989), compared with the daytime (N = 235,233). In programs containing alcohol advertising, sport TV had a greater mean number of alcohol adverts per hour (mean 1.74, SD = 1.1) than non-sport TV (mean 1.35, SD = .94). Alcohol advertising during the daytime, when large numbers of children are watching TV, is predominantly in free-to-air sport TV. By permitting day-time advertising in sport programs and in any programs from 8.30 pm when many children are still watching TV, current regulations are not protecting children from exposure to alcohol advertising.

  1. Alcohol Advertising in Sport and Non-Sport TV in Australia, during Children’s Viewing Times

    PubMed Central

    O’Brien, Kerry S.; Carr, Sherilene; Ferris, Jason; Room, Robin; Miller, Peter; Livingston, Michael; Kypri, Kypros; Lynott, Dermot

    2015-01-01

    Estimate the amount of alcohol advertising in sport vs. non-sport programming in Australian free-to-air TV and identify children’s viewing audience composition at different times of the day. Alcohol advertising and TV viewing audience data were purchased for free-to-air sport and non-sport TV in Australia for 2012. We counted alcohol advertisements in sport and non-sport TV in daytime (6am-8.29pm) and evening periods (8.30pm-11.59pm) and estimated viewing audiences for children and young adults (0–4 years, 5–13 years, 14–17 years, 18–29 years). During the daytime, most of the alcohol advertising (87%) was on sport TV. In the evening, most alcohol advertising (86%) was in non-sport TV. There was little difference in the mean number of children (0–17 years) viewing TV in the evening (N = 273,989), compared with the daytime (N = 235,233). In programs containing alcohol advertising, sport TV had a greater mean number of alcohol adverts per hour (mean 1.74, SD = 1.1) than non-sport TV (mean 1.35, SD = .94). Alcohol advertising during the daytime, when large numbers of children are watching TV, is predominantly in free-to-air sport TV. By permitting day-time advertising in sport programs and in any programs from 8.30pm when many children are still watching TV, current regulations are not protecting children from exposure to alcohol advertising. PMID:26263170

  2. Materiel Readiness Support Activity Automation Plan

    DTIC Science & Technology

    1986-09-01

    Hardwire leased lines Sytek RF broadband cable modems Digital phone switched service Medium Speed - up to 56k baud RF modems Digital phone service High...dialing 121 I iI Medium Speed - up to 56k baud RF modems - up to 56k baud sync modem $2070 plus installation - $25 per month maintenance - $1200 per...security is to disconnect net- work, modem , and hardwire access (that is, all external access to the machine) after 5 p.m. (normal business hours

  3. Advanced Communications Technology Satellite high burst rate link evaluation terminal experiment control and monitor software maintenance manual, version 1.0

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.

    1992-01-01

    The Experiment Control and Monitor (EC&M) software was developed at NASA Lewis Research Center to support the Advanced Communications Technology Satellite (ACTS) High Burst Rate Link Evaluation Terminal (HBR-LET). The HBR-LET is an experimenter's terminal to communicate with the ACTS for various investigations by government agencies, universities, and industry. The EC&M software is one segment of the Control and Performance Monitoring (C&PM) software system of the HBR-LET. The EC&M software allows users to initialize, control, and monitor the instrumentation within the HBR-LET using a predefined sequence of commands. Besides instrument control, the C&PM software system is also responsible for computer communication between the HBR-LET and the ACTS NASA Ground Station and for uplink power control of the HBR-LET to demonstrate power augmentation during rain fade events. The EC&M Software User's Guide, Version 1.0 (NASA-CR-189160) outlines the commands required to install and operate the EC&M software. Input and output file descriptions, operator commands, and error recovery procedures are discussed in the document. The EC&M Software Maintenance Manual, Version 1.0 (NASA-CR-189161) is a programmer's guide that describes current implementation of the EC&M software from a technical perspective. An overview of the EC&M software, computer algorithms, format representation, and computer hardware configuration are included in the manual.

  4. Planning factors for developing an enterprise-wide picture archiving and communication system maintenance program.

    PubMed

    Staley, S; Romlein, J; Chacko, A K; Wider, R

    2000-05-01

    Picture archiving and communication system (PACS) maintenance on an individual site basis has historically been a complex and costly challenge. With the advent of enterprise-wide PACS projects such as the Virtual Radiology Environment (VRE) project, the challenge of a maintenance program with even more complexities has presented itself. The approach of the project management team for the VRE project is not one of reactive maintenance, but one of highly proactive planning and negotiations, in hopes of capitalizing on the economies of scale of an enterprise-wide PACS maintenance program. A proactive maintenance program is one aspect of life-cycle management. As with any capital acquisition, life-cycle management may be used to manage the specific project aspects related to PACS. The purpose of an enterprise-wide warranty and maintenance life-cycle management approach is to maintain PACS at its maximum operational efficiency and utilization levels through a flexible, shared, yet symbiotic relationship between local, regional, and vendor resources. These goals include providing maximum operational performance levels on a local, regional, and enterprise basis, while maintaining acceptable costs and resource utilization levels. This goal must be achieved without negatively impacting point of care activities, regardless of changes to the clinical business environment.

  5. Indoor PM2.5 in an urban zone with heavy wood smoke pollution: The case of Temuco, Chile.

    PubMed

    Jorquera, Héctor; Barraza, Francisco; Heyer, Johanna; Valdivia, Gonzalo; Schiappacasse, Luis N; Montoya, Lupita D

    2018-05-01

    Temuco is a mid-size city representative of severe wood smoke pollution in southern Chile; however, little is known about the indoor air quality in this region. A field measurement campaign at 63 households in the Temuco urban area was conducted in winter 2014 and is reported here. In this study, indoor and outdoor (24-hr) PM 2.5 and its elemental composition were measured and compared. Infiltration parameters and outdoor/indoor contributions to indoor PM 2.5 were also determined. A statistical evaluation of how various air quality interventions and household features influence indoor PM 2.5 was also performed. This study determined median indoor and outdoor PM 2.5 concentrations of 44.4 and 41.8 μg/m 3 , respectively. An average infiltration factor (0.62 ± 0.06) was estimated using sulfur as a tracer species. Using a simple mass balance approach, median indoor and outdoor contributions to indoor PM 2.5 concentrations were then estimated as 12.5 and 26.5 μg/m 3 , respectively; therefore, 68% of indoor PM 2.5 comes from outdoor infiltration. This high percentage is due to high outdoor pollution and relatively high household air exchange rates (median: 1.06 h -1 ). This study found that S, Br and Rb were dominated by outdoor contributions, while Si, Ca, Ti, Fe and As originated from indoor sources. Using continuous indoor and outdoor PM 2.5 measurements, a median indoor source strength of 75 μg PM 2.5 /min was estimated for the diurnal period, similar to literature results. For the evening period, the median estimate rose to 135 μg PM 2.5 /min, reflecting a more intense wood burning associated to cooking and space heating at night. Statistical test results (at the 90% confidence level) support the ongoing woodstove replacement program (reducing emissions) and household weatherization subsidies (reducing heating demand) for improving indoor air quality in southern Chile, and suggest that a cookstove improvement program might be helpful as well. Copyright © 2018 Elsevier Ltd. All rights reserved.

  6. 77 FR 12175 - Airworthiness Directives; DASSAULT AVIATION Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... specified products. The MCAI states: The Maintenance Procedure (MP) 57-607, related to non destructive check... Recommended Maintenance Schedules chapter of the Aircraft Maintenance Documentation. After the implementation... maintenance program to include ``Non-Destructive Check of Flap Tracks 2 and 5,'' Maintenance Procedure 57-607...

  7. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Approved aircraft inspection program. 135...

  8. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Approved aircraft inspection program. 135...

  9. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Approved aircraft inspection program. 135...

  10. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Approved aircraft inspection program. 135...

  11. 14 CFR 135.419 - Approved aircraft inspection program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Approved aircraft inspection program. 135...

  12. Literature and best practices scan : Vehicle Inspection and Maintenance (I/M) Programs

    DOT National Transportation Integrated Search

    2002-06-01

    The state of Wisconsin operates one of the nation's most effective inspection/maintenance (I/M) programs. In Wisconsin's I/M program, vehicles registered in the Milwaukee metropolitan area are subjected to a transient emission test using the IM240 te...

  13. Survey of transit bus maintenance programs in Virginia.

    DOT National Transportation Integrated Search

    1981-01-01

    Transit bus maintenance practices as used by thirteen small and medium-sized transit systems in Virginia were cataloged. Different approaches to maintenance were investigated and the current condition of transit bus maintenance was determined. Factor...

  14. Real-time PM10 concentration monitoring on Penang Bridge by using traffic monitoring CCTV

    NASA Astrophysics Data System (ADS)

    Low, K. L.; Lim, H. S.; MatJafri, M. Z.; Abdullah, K.; Wong, C. J.

    2007-04-01

    For this study, an algorithm was developed to determine concentration of particles less than 10μm (PM10) from still images captured by a CCTV camera on the Penang Bridge. The objective of this study is to remotely monitor the PM10 concentrations on the Penang Bridge through the internet. So, an algorithm was developed based on the relationship between the atmospheric reflectance and the corresponding air quality. By doing this, the still images were separated into three bands namely red, green and blue and their digital number values were determined. A special transformation was then performed to the data. Ground PM10 measurements were taken by using DustTrak TM meter. The algorithm was calibrated using a regression analysis. The proposed algorithm produced a high correlation coefficient (R) and low root-mean-square error (RMS) between the measured and produced PM10. Later, a program was written by using Microsoft Visual Basic 6.0 to download still images from the camera over the internet and implement the newly developed algorithm. Meanwhile, the program is running in real time and the public will know the air pollution index from time to time. This indicates that the technique using the CCTV camera images can provide a useful tool for air quality studies.

  15. 78 FR 45135 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Redesignation of the Dayton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ...EPA is proposing to approve the State of Ohio's request to redesignate the Dayton-Springfield nonattainment area (Dayton) to attainment for the 1997 annual National Ambient Air Quality Standards (NAAQS or standard) for fine particulate matter (PM2.5). EPA is also proposing to approve the related elements including emissions inventories, maintenance plans, and the accompanying motor vehicle budgets. EPA is proposing to approve a comprehensive emissions inventory that meets the Clean Air Act (CAA) requirement. EPA is proposing that the inventories for nitrogen oxides (NOX), direct PM2.5, sulfur dioxide (SO2), ammonia, and volatile organic compounds (VOC) meet the CAA emissions inventory requirement. In the course of proposing to approve Ohio's request to redesignate the Dayton area, EPA addresses a number of additional issues, including the effects of two decisions of the United States Court of Appeals for the District of Columbia (D.C. Circuit or Court): (1) The Court's August 21, 2012, decision to vacate and remand to EPA the Cross-State Air Pollution Control Rule (CSAPR) and (2) the Court's January 4, 2013, decision to remand to EPA two final rules implementing the 1997 PM2.5 standard.

  16. Seasonal variation of PM10 chemical constituents in different French urban environments

    NASA Astrophysics Data System (ADS)

    Salameh, Dalia; Golly, Benjamin; Besombes, Jean Luc; Alleman, Laurent; Favez, Olivier; Jaffrezo, Jean Luc

    2016-04-01

    Particulate matter (PM10, with a diameter less than 10 μm) is a heterogeneous mixture of natural and anthropogenic components including organic and elemental carbon (OC, and EC), sulfates, nitrates, ammonium, mineral dust, trace elements, seasalt, which has been linked to adverse impact on human health, visibility, and climate change. Atmospheric PM concentration and composition can vary widely due to different climatic conditions and local features such as anthropogenic source types, emission rates and dispersion patterns. Moreover, the contribution of natural sources (e.g. seasalt and dust) varies from one region to another. However, a fundamental step towards a better understanding and identification of the sources of PM10 is constituted by the study of aerosol chemical composition. Moreover, in order to define cost effective emission abatement strategies, research studies to interpret the variability of PM10 levels and components and to identify the main emission sources influencing ambient air PM10 levels is still needed. In a national context of a better understanding of PM composition and sources, and therefore the implementation of efficient reduction plans of PM in France, various monitoring campaigns were carried out recently within different air quality programs, where PM10 filter samples were collected on a 24 hour basis at various type of French sites (e.g. urban, rural, etc.,), located in different urban environments. An extensive chemical characterization of PM10 composition at these sites was performed, and a large range of analytical techniques was used to determine the concentrations of various chemical species which included the analysis of OC, and EC, major ionic species (SO42-, NO3-, Cl-, NH4+, K+, Na+, Mg2+, and Ca2+), metals and trace elements (e.g. Al, Ca, Cu, Fe, K, Mg, Mn, Na, Ni, Pb, V, Zn, etc.,), and organic compounds (e.g. sugars, polyols, PAH, methyl PAH, sulfur PAH, alkanes, hopanes, and methoxyphenols). The seasonal and spatial variability in PM10 levels and in the concentrations of various aerosol components observed at the different studied sites were investigated and compared. Moreover, the PM mass closure has been also obtained, and allowed us to link some of the quantified chemical species with their specific sources. Acknowledgments The authors acknowledge the French Ministry of Environment (MEDDE, Ministère de l'Ecologie, du Développement durable, et de l'Energie) and the national reference laboratory for air quality monitoring (LCSQA) for their funding the different programs and of the collection of PM10 samples.

  17. Evaluation of the Implementation of Operations and Maintenance Programs in New Jersey Schools.

    ERIC Educational Resources Information Center

    Kominsky, John R.; Freyberg, Ronald W.; Gerber, Donald R.; Centifonti, Gary J.

    All schools are required to develop and implement an asbestos management plan (AMP). The key component of this plan is each school's operations and maintenance (O&M) program. This report outlines the importance of such programs. It describes an O&M program as an administrative framework that prescribes specific activities and work…

  18. Evaluation of the Industrial Maintenance Program at Caldwell Community College and Technical Institute.

    ERIC Educational Resources Information Center

    Pipes, V. David

    In 1982-83, a study was conducted at Caldwell Community College and Technical Institute to determine whether the objectives of the Industrial Maintenance Program were being met, to measure program success, and to identify aspects needing improvement. Surveys were sent to 30 students who graduated from the program before 1978, yielding a 57%…

  19. Facilities Management: A Program for the 1980s.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.

    1980-01-01

    Successful facilities management is described as based on a 10-point comprehensive program including: (1) physical planning policy; (2) facilities analysis; (3) management audit; (4) space utilization; (5) capital programs; (6) deferred maintenance; (7) controlled maintenance; (8) energy conservation; (9) environmental quality, health, and safety;…

  20. Deferred School Maintenance Creates National Crises.

    ERIC Educational Resources Information Center

    Geiger, Philip E.

    2002-01-01

    Describes the cost and causes of the school maintenance "crises"; lists seven questions to determine if a school district has a quality maintenance program; describes consequences of deferred school maintenance in Yuma (Arizona) Union High School District. (PKP)

Top