NPDES (National Pollution Discharge & Elimination System) Minor Dischargers
As authorized by the Clean Water Act, the National Pollutant Discharge Elimination System (NPDES) permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States. The NPDES permit program regulates direct discharges from municipal and industrial wastewater treatment facilities that discharge directly into surface waters. The NPDES permit program is part of the Permit Compliance System (PCS) which issues, records, tracks, and regulates point source discharge facilities. Individual homes that are connected to a municipal system, use a septic system, or do not have a surface discharge do not need an NPDES permit. Facilities in PCS are identified as either major or minor. Within the major/minor classification, facilities are grouped into municipals or non-municipals. In many cases, non-municipals are industrial facilities. This data layer contains Minor dischargers. Major municipal dischargers include all facilities with design flows of greater than one million gallons per day; minor dischargers are less that one million gallons per day. Essentially, a minor discharger does not meet the discharge criteria for a major. Since its introduction in 1972, the NPDES permit program is responsible for significant improvements to our Nation's water quality.
47 CFR 73.7001 - Services subject to evaluation by point system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... evaluate mutually exclusive applications for new radio, television, and FM translator facilities, and for... mutually exclusive applications for new radio, television, and FM translator facilities, and for major... television translator and low power television facilities, and for major changes to existing facilities, only...
Space power distribution system technology. Volume 3: Test facility design
NASA Technical Reports Server (NTRS)
Decker, D. K.; Cannady, M. D.; Cassinelli, J. E.; Farber, B. F.; Lurie, C.; Fleck, G. W.; Lepisto, J. W.; Messner, A.; Ritterman, P. F.
1983-01-01
The AMPS test facility is a major tool in the attainment of more economical space power. The ultimate goals of the test facility, its primary functional requirements and conceptual design, and the major equipment it contains are discussed.
Construction bidding cost of KSC's space shuttle facilities
NASA Technical Reports Server (NTRS)
Brown, Joseph Andrew
1977-01-01
The bidding cost of the major Space Transportation System facilities constructed under the responsibility of the John F. Kennedy Space Center (KSC) is described and listed. These facilities and Ground Support Equipment (GSE) are necessary for the receiving, assembly, testing, and checkout of the Space Shuttle for launch and landing missions at KSC. The Shuttle launch configuration consists of the Orbiter, the External Tank, and the Solid Rocket Boosters (SRB). The reusable Orbiter and SRB's is the major factor in the program that will result in lowering space travel costs. The new facilities are the Landing Facility; Orbiter Processing Facility; Orbiter Approach and Landing Test Facility (Dryden Test Center, California); Orbiter Mating Devices; Sound Suppression Water System; and Emergency Power System for LC-39. Also, a major factor was to use as much Apollo facilities and hardware as possible to reduce the facilities cost. The alterations to existing Apollo facilities are the VAB modifications; Mobile Launcher Platforms; Launch Complex 39 Pads A and B (which includes a new concept - the Rotary Service Structure), which was featured in ENR, 3 Feb. 1977, 'Hinged Space Truss will Support Shuttle Cargo Room'; Launch Control Center mods; External Tank and SRB Processing and Storage; Fluid Test Complex mods; O&C Spacelab mods; Shuttle mods for Parachute Facility; SRB Recovery and Disassembly Facility at Hangar 'AF'; and an interesting GSE item - the SRB Dewatering Nozzle Plug Sets (Remote Controlled Submarine System) used to inspect and acquire for reuse of SRB's.
Energy consumption and load profiling at major airports. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kennedy, J.
1998-12-01
This report describes the results of energy audits at three major US airports. These studies developed load profiles and quantified energy usage at these airports while identifying procedures and electrotechnologies that could reduce their power consumption. The major power consumers at the airports studied included central plants, runway and taxiway lighting, fuel farms, terminals, people mover systems, and hangar facilities. Several major findings emerged during the study. The amount of energy efficient equipment installed at an airport is directly related to the age of the facility. Newer facilities had more energy efficient equipment while older facilities had much of themore » original electric and natural gas equipment still in operation. As redesign, remodeling, and/or replacement projects proceed, responsible design engineers are selecting more energy efficient equipment to replace original devices. The use of computer-controlled energy management systems varies. At airports, the primary purpose of these systems is to monitor and control the lighting and environmental air conditioning and heating of the facility. Of the facilities studied, one used computer management extensively, one used it only marginally, and one had no computer controlled management devices. At all of the facilities studied, natural gas is used to provide heat and hot water. Natural gas consumption is at its highest in the months of November, December, January, and February. The Central Plant contains most of the inductive load at an airport and is also a major contributor to power consumption inefficiency. Power factor correction equipment was used at one facility but was not installed at the other two facilities due to high power factor and/or lack of need.« less
Centrifuge facility conceptual system study. Volume 2: Facility systems and study summary
NASA Technical Reports Server (NTRS)
Synnestvedt, Robert (Editor); Blair, Patricia; Cartledge, Alan; Garces-Porcile, Jorge; Garin, Vladimir; Guerrero, Mike; Haddeland, Peter; Horkachuck, Mike; Kuebler, Ulrich; Nguyen, Frank
1991-01-01
The Centrifuge Facility is a major element of the biological research facility for the implementation of NASA's Life Science Research Program on Space Station Freedom using nonhuman species (small primates, rodents, plants, insects, cell tissues, etc.). The Centrifuge Facility consists of a variable gravity Centrifuge to provide artificial gravity up to 2 earth G's' a Holding System to maintain specimens at microgravity levels, a Glovebox, and a Service Unit for servicing specimen chambers. The following subject areas are covered: (1) Holding System; (2) Centrifuge System; (3) Glovebox System; (4) Service System; and (5) system study summary.
2011-05-10
Environmental Management Information System to Meet Regulatory Compliance and Reporting Requirements for a Major Source Title V Facility. Tannis Danley...AND SUBTITLE Work Smarter Not Harder: Utilizing an Environmental Management Information System to Meet Regulatory Compliance and Reporting...Carson) – EMS (Hawaii Garrison, West Virginia National Guard) Environmental Management Information System (EMIS) National Defense Center for Energy and
Report #2007-P-00023, May 14, 2007. EPA did not provide effective enforcement oversight of major facilities with National Pollutant Discharge Elimination System permits in long-term significant noncompliance.
Space station systems analysis study. Part 1, volume 1: Executive study
NASA Technical Reports Server (NTRS)
1976-01-01
Potential space station system options were examined for a permanent, manned, orbital space facility and to provide data to NASA program planners and decision makers for their use in future program planning. There were ten space station system objectives identified. These were categorized into five major objectives and five supporting objectives. The major objectives were to support the development of: (1) satellite power systems, (2) nuclear energy plants in space, (3) space processing, (4) earth services, and (5) space cosmological research and development. The five supporting objectives, to define space facilities which would be basic building blocks for future systems, were: (1) a multidiscipline science laboratory, (2) an orbital depot to maintain, fuel, and service orbital transfer vehicles, (3) cluster support systems to provide power and data processing for multiple orbital elements, (4) a sensor development facility, and (5) the facilities necessary to enhance man's living and working in space.
The planned Alaska SAR Facility - An overview
NASA Technical Reports Server (NTRS)
Carsey, Frank; Weeks, Wilford
1987-01-01
The Alaska SAR Facility (ASF) is described in an overview fashion. The facility consists of three major components, a Receiving Ground System, a SAR Processing System and an Analysis and Archiving System; the ASF Program also has a Science Working Team and the requisite management and operations systems. The ASF is now an approved and fully funded activity; detailed requirements and science background are presented for the facility to be implemented for data from the European ERS-1, the Japanese ERS-1 and Radarsat.
Computer-Aided Facilities Management Systems (CAFM).
ERIC Educational Resources Information Center
Cyros, Kreon L.
Computer-aided facilities management (CAFM) refers to a collection of software used with increasing frequency by facilities managers. The six major CAFM components are discussed with respect to their usefulness and popularity in facilities management applications: (1) computer-aided design; (2) computer-aided engineering; (3) decision support…
Welcome to NNIN | National Nanotechnology Infrastructure Network
ALD system located at the Stanford Nanofabrication Facility, one of the 14 NNIN nodes. NNIN facilities facilities such as this CVD furnace at the Cornell facility. Student using one of the scanning electron microscopes at the Howard University NNIN facility. This is one of over 1100 major instruments available
Centrifuge Facility Conceptual System Study. Volume 1: Facility overview and habitats
NASA Technical Reports Server (NTRS)
Synnestvedt, Robert (Editor)
1990-01-01
The results are presented for a NASA Phase 1 study conducted from mid 1987 through mid 1989 at Ames Research Center. The Centrifuge Facility is the major element of the biological research facility for the implementation of NASA's Life Science Research Program on Space Station Freedom using non-human specimens (such as small primates, rodents, plants, insects, cell tissues). Five systems are described which comprise the Facility: habitats, holding units, centrifuge, glovebox, and service unit. Volume 1 presents a facility overview and describes the habitats - modular units which house living specimens.
Improving the explanation capabilities of advisory systems
NASA Technical Reports Server (NTRS)
Porter, Bruce; Souther, Art
1993-01-01
A major limitation of current advisory systems (e.g., intelligent tutoring systems and expert systems) is their restricted ability to give explanations. The goal of our research is to develop and evaluate a flexible explanation facility, one that can dynamically generate responses to questions not anticipated by the system's designers and that can tailor these responses to individual users. To achieve this flexibility, we are developing a large knowledge base, a viewpoint construction facility, and a modeling facility. In the long term we plan to build and evaluate advisory systems with flexible explanation facilities for scientists in numerous domains. In the short term, we are focusing on a single complex domain in biological science, and we are working toward two important milestones: (1) building and evaluating an advisory system with a flexible explanation facility for freshman-level students studying biology; and (2) developing general methods and tools for building similar explanation facilities in other domains.
Improving the explanation capabilities of advisory systems
NASA Technical Reports Server (NTRS)
Porter, Bruce; Souther, Art
1994-01-01
A major limitation of current advisory systems (e.g., intelligent tutoring systems and expert systems) is their restricted ability to give explanations. The goal of our research is to develop and evaluate a flexible explanation facility, one that can dynamically generate responses to questions not anticipated by the system's designers and that can tailor these responses to individual users. To achieve this flexibility, we are developing a large knowledge base, a viewpoint construction facility, and a modeling facility. In the long term we plan to build and evaluate advisory systems with flexible explanation facilities for scientists in numerous domains. In the short term, we are focusing on a single complex domain in biological science, and we are working toward two important milestones: (1) building and evaluating an advisory system with a flexible explanation facility for freshman-level students studying biology, and (2) developing general methods and tools for building similar explanation facilities in other domains.
NASA Technical Reports Server (NTRS)
Rigo, H. S.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Bents, D. J.; Hatch, A. M.
1981-01-01
A description and the design requirements for the 200 MWe (nominal) net output MHD Engineering Test Facility (ETF) Conceptual Design, are presented. Performance requirements for the plant are identified and process conditions are indicated at interface stations between the major systems comprising the plant. Also included are the description, functions, interfaces and requirements for each of these major systems. The lastest information (1980-1981) from the MHD technology program are integrated with elements of a conventional steam electric power generating plant.
ERIC Educational Resources Information Center
Hruday, Connie; And Others
This document is designed to assist the Council of Educational Facility Planners International (CEFP/I) in planning for the establishment of an information system for its members and other stakeholders who need information on educational facilities. The report focuses on the major activities to be accomplished and the issues to be considered when…
The design of components for an advanced Rankine cycle test facility.
NASA Technical Reports Server (NTRS)
Bond, J. A.
1972-01-01
The design of a facility for testing components of an advanced Rankine cycle power system is summarized. The facility is a three-loop system in which lithium, potassium and NaK-78 are the working fluids of the primary, secondary and heat-rejection loops, respectively. Design bases and performance predictions for the major loop components, including the lithium heater and the potassium boiler, condenser and preheater, are outlined.
Urban Rail Supporting Technology Program Fiscal Year 1974 Year End Summary
DOT National Transportation Integrated Search
1975-03-01
Major areas include program management, technical support and application engineering, facilities development, test and evaluation, and technology development. Specific technical discussion includes track measurement systems; UMTA facilities developm...
32 CFR 775.6 - Planning considerations.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., installation, and operation of utility (e.g., water, sewer, electrical) and communication systems (e.g., data... systems, and/or facilities; (37) Decisions to close facilities, decommission equipment, and/or temporarily... environment. The agency decision in the case of an EIS is reflected in a ROD. (b) Where a proposed major...
32 CFR 775.6 - Planning considerations.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., installation, and operation of utility (e.g., water, sewer, electrical) and communication systems (e.g., data... systems, and/or facilities; (37) Decisions to close facilities, decommission equipment, and/or temporarily... environment. The agency decision in the case of an EIS is reflected in a ROD. (b) Where a proposed major...
LSS systems planning and performance program
NASA Technical Reports Server (NTRS)
Mckenna, Victoria Jones; Dendy, Michael J.; Naumann, Charles B.; Rice, Sally A.; Weathers, John M.
1993-01-01
This report describes, using viewgraphs, the Marshall Space Flight Center's Large Space Structures Ground Test Facilities located in building 4619. Major topics include the Active Control Evaluation of Systems (ACES) Laboratory; the Control-Structures Interaction/Controls, Astrophysics, and Structures Experiment in Space (CSI/CASES); Advanced Development Facility; and the ACES Guest Investigator Program.
Impact of Distributed Energy Resources on the Reliability of a Critical Telecommunications Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson, D.; Atcitty, C.; Zuffranieri, J.
2006-03-01
Telecommunications has been identified by the Department of Homeland Security as a critical infrastructure to the United States. Failures in the power systems supporting major telecommunications service nodes are a main contributor to major telecommunications outages, as documented by analyses of Federal Communications Commission (FCC) outage reports by the National Reliability Steering Committee (under auspices of the Alliance for Telecommunications Industry Solutions). There are two major issues that are having increasing impact on the sensitivity of the power distribution to telecommunication facilities: deregulation of the power industry, and changing weather patterns. A logical approach to improve the robustness of telecommunicationmore » facilities would be to increase the depth and breadth of technologies available to restore power in the face of power outages. Distributed energy resources such as fuel cells and gas turbines could provide one more onsite electric power source to provide backup power, if batteries and diesel generators fail. But does the diversity in power sources actually increase the reliability of offered power to the office equipment, or does the complexity of installing and managing the extended power system induce more potential faults and higher failure rates? This report analyzes a system involving a telecommunications facility consisting of two switch-bays and a satellite reception system.« less
Availability analysis of an HTGR fuel recycle facility. Summary report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sharmahd, J.N.
1979-11-01
An availability analysis of reprocessing systems in a high-temperature gas-cooled reactor (HTGR) fuel recycle facility was completed. This report summarizes work done to date to define and determine reprocessing system availability for a previously planned HTGR recycle reference facility (HRRF). Schedules and procedures for further work during reprocessing development and for HRRF design and construction are proposed in this report. Probable failure rates, transfer times, and repair times are estimated for major system components. Unscheduled down times are summarized.
A security/safety survey of long term care facilities.
Acorn, Jonathan R
2010-01-01
What are the major security/safety problems of long term care facilities? What steps are being taken by some facilities to mitigate such problems? Answers to these questions can be found in a survey of IAHSS members involved in long term care security conducted for the IAHSS Long Term Care Security Task Force. The survey, the author points out, focuses primarily on long term care facilities operated by hospitals and health systems. However, he believes, it does accurately reflect the security problems most long term facilities face, and presents valuable information on security systems and practices which should be also considered by independent and chain operated facilities.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
... facility, a wind farm, a methane- gas cofiring facility, and several small solar photovoltaic facilities... maintenance of select plant systems and other regulatory compliance activities. Major buildings and plant... the plant cooling towers and the reactor, auxiliary, control, turbine, office, and service buildings...
EPA Facility Registry Service (FRS): Facility Interests Dataset - Intranet
This web feature service consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers of haz
EPA Facility Registry Service (FRS): Facility Interests Dataset - Intranet Download
This downloadable data package consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers
EPA Facility Registry Service (FRS): Facility Interests Dataset Download
This downloadable data package consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers
EPA Facility Registry Service (FRS): Facility Interests Dataset
This web feature service consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers of haz
Description and Operation of the A3 Subscale Facility
NASA Technical Reports Server (NTRS)
Saunders, G. P.; Varner, D. G.; Grover, J. B.
2010-01-01
The purpose of this paper is to give an overview of the general design and operation of the A3 Subscale test facility. The goal is to provide the reader with a general understanding of what the major facility systems are, where they are located, and how they are used to meet the objectives supporting the design of the A3 altitude rocket test facility. This paper also provides the reader with the background information prior to reading the subsequent papers detailing the design and test results of the various systems described herein.
EOS MLS Science Data Processing System: A Description of Architecture and Capabilities
NASA Technical Reports Server (NTRS)
Cuddy, David T.; Echeverri, Mark D.; Wagner, Paul A.; Hanzel, Audrey T.; Fuller, Ryan A.
2006-01-01
This paper describes the architecture and capabilities of the Science Data Processing System (SDPS) for the EOS MLS. The SDPS consists of two major components--the Science Computing Facility and the Science Investigator-led Processing System. The Science Computing Facility provides the facilities for the EOS MLS Science Team to perform the functions of scientific algorithm development, processing software development, quality control of data products, and scientific analyses. The Science Investigator-led Processing System processes and reprocesses the science data for the entire mission and delivers the data products to the Science Computing Facility and to the Goddard Space Flight Center Earth Science Distributed Active Archive Center, which archives and distributes the standard science products.
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2010 CFR
2010-01-01
... assurance program will be implemented; (26) The applicant's organizational structure, allocations or... presents a safety analysis of the structures, systems, and components of the facility as a whole. The final... contain an analysis and evaluation of the major structures, systems, and components of the facility that...
Building Systems on the Campus, Part I. BSIC/EFL Newsletter.
ERIC Educational Resources Information Center
BSIC/EFL Newsletter, 1972
1972-01-01
The major systems development projects of the 1960's were concerned primarily with facility problems at the elementary and secondary levels. Rapidly increasing enrollments coupled with changes in both curriculum and in teaching methods created a demand for more flexible facilities that could be constructed rapidly and inexpensively. The success of…
System aspects of the Indian MST radar facility
NASA Technical Reports Server (NTRS)
Viswanathan, G.
1986-01-01
One of the major objectives of the Indian Middle Atmosphere Program is to investigate the motions of the middle atmosphere on temporal and spatial scales and the interaction between the three height regions of the middle atmosphere. Realizing the fact that radar technique has proven to be a very powerful tool for the study of Earth atmosphere, the Indian Middle Atmosphere Program has recommended establishing a mesosphere-stratosphere-troposphere (MST) radar as a national facility for atmospheric research. The major landmarks in this attempt to setup the MST radar as a national facility are described.
Singh, Thokchom Dewan; Jayaraman, T; Arunkumar Sharma, B
2017-03-01
This study aims to assess the adequacy level of radiological protection systems available in the diagnostic radiology facilities located in three capital cities of North East (NE) India. It further attempts to understand, using a multi-disciplinary approach, how the safety codes/standards in diagnostic radiology framed by the Atomic Energy Regulatory Board (AERB) and the International Atomic Energy Agency (IAEA) to achieve adequate radiological protection in facilities, have been perceived, conceptualized, and applied accordingly in these facilities. About 30 diagnostic radiology facilities were randomly selected from three capitals of states in NE India; namely Imphal (Manipur), Shillong (Meghalaya) and Guwahati (Assam). A semi-structured questionnaire developed based on a multi-disciplinary approach was used for this study. It was observed that radiological practices undertaken in these facilities were not exactly in line with safety codes/standards in diagnostic radiology of the AERB and the IAEA. About 50% of the facilities had registered/licensed x-ray equipment with the AERB. More than 80% of the workers did not use radiation protective devices, although these devices were available in the facilities. About 85% of facilities had no institutional risk management system. About 70% of the facilities did not carry out periodic quality assurance testing of their x-ray equipment or surveys of radiation leakage around the x-ray room, and did not display radiation safety indicators in the x-ray rooms. Workers in these facilities exhibited low risk perception about the risks associated with these practices. The majority of diagnostic radiology facilities in NE India did not comply with the radiological safety codes/standards framed by the AERB and IAEA. The study found inadequate levels of radiological protection systems in the majority of facilities. This study suggests a need to establish firm measures that comply with the radiological safety codes/standards of the AERB and IAEA to protect patients, workers and the public of this region.
CSP cogeneration of electricity and desalinated water at the Pentakomo field facility
NASA Astrophysics Data System (ADS)
Papanicolas, C. N.; Bonanos, A. M.; Georgiou, M. C.; Guillen, E.; Jarraud, N.; Marakkos, C.; Montenon, A.; Stiliaris, E.; Tsioli, E.; Tzamtzis, G.; Votyakov, E. V.
2016-05-01
The Cyprus Institute's Pentakomo Field Facility (PFF) is a major infrastructure for research, development and testing of technologies relating to concentrated solar power (CSP) and solar seawater desalination. It is located at the south coast of Cyprus near the sea and its environmental conditions are fully monitored. It provides a test facility specializing in the development of CSP systems suitable for island and coastal environments with particular emphasis on small units (<25 MWth) endowed with substantial storage, suitable for use in isolation or distributed in small power grids. The first major experiment to take place at the PFF concerns the development of a pilot/experimental facility for the co-generation of electricity and desalinated seawater from CSP. Specifically, the experimental plant consists of a heliostat-central receiver system for solar harvesting, thermal energy storage in molten salts followed by a Rankine cycle for electricity production and a multiple-effect distillation (MED) unit for desalination.
Update of KSC activities for the space transportation system
NASA Technical Reports Server (NTRS)
Gray, R. H.
1979-01-01
The paper is a status report on the facilities and planned operations at the Kennedy Space Center (KSC) that will support Space Shuttle launches. The conversion of KSC facilities to support efficient and economical checkout and launch operations in the era of the Space Shuttle is nearing completion. The driving force behind the KSC effort has been the necessity of providing adequate and indispensable facilities and support systems at minimum cost. This required the optimum utilization of existing buildings, equipment and systems, both at KSC and at Air Force property on Cape Canaveral, as well as the construction of two major new facilities and several minor ones. The entirely new structures discussed are the Shuttle Landing Facility and Orbiter Processing Facility. KSC stands ready to provide the rapid reliable economical landing-to-launch processing needed to ensure the success of this new space transportation system.
Expedition 29/30 crew training during Electrical Power System Major Case training
2011-06-22
PHOTO DATE: 22 June 2011 LOCATION: Bldg. 5, Space Station Training Facility. SUBJECT: Expedition 29/30 crew training during Electrical Power System Major Case training event. Astronauts Dan Burbank, Don Pettit and Andre Kuipers working together in mockup. PHOTOGRAPHER: Mark Sowa
Industrial Energy Training and Certification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Glatt, Sandy; Cox, Daryl; Nimbalkar, Sachin U.
Compressed air systems, ammonia refrigeration systems, chilled water systems, steam systems, process heating systems, combined heat and power systems, pump systems and fan systems are major industrial energy systems commonly found in manufacturing facilities. Efficiency of these systems contributes significantly to whole facilities' energy performance. On the national, even international level, well-structured training and highly recognized certification programs help develop a highly-skilled and qualified workforce to maintain and improve facilities' energy performance, particularly as technologies within these systems become more advanced. The purpose of this paper is to review currently available training and certification programs focusing on these systems andmore » to identify the gap between market's needs and currently available programs. Three major conclusions are: first, most training programs focus on operations, maintenance, safety and design although some briefly touch the energy performance aspect; second, except CRES by RETA and PSA Certificate and PSAP Master Certification by HI, no other certifications had been found emphasizing on knowledge and skills for improving and maintaining these systems' energy performance; third, developing energy efficiency focused training and ANSI accredited certification programs on these energy systems will fill the gap between market's needs and currently available programs.« less
Industrial Energy Training and Certification
Glatt, Sandy; Cox, Daryl; Nimbalkar, Sachin U.; ...
2017-11-01
Compressed air systems, ammonia refrigeration systems, chilled water systems, steam systems, process heating systems, combined heat and power systems, pump systems and fan systems are major industrial energy systems commonly found in manufacturing facilities. Efficiency of these systems contributes significantly to whole facilities' energy performance. On the national, even international level, well-structured training and highly recognized certification programs help develop a highly-skilled and qualified workforce to maintain and improve facilities' energy performance, particularly as technologies within these systems become more advanced. The purpose of this paper is to review currently available training and certification programs focusing on these systems andmore » to identify the gap between market's needs and currently available programs. Three major conclusions are: first, most training programs focus on operations, maintenance, safety and design although some briefly touch the energy performance aspect; second, except CRES by RETA and PSA Certificate and PSAP Master Certification by HI, no other certifications had been found emphasizing on knowledge and skills for improving and maintaining these systems' energy performance; third, developing energy efficiency focused training and ANSI accredited certification programs on these energy systems will fill the gap between market's needs and currently available programs.« less
National Study of Vocational Education Systems and Facilities. Volume I. Technical Report.
ERIC Educational Resources Information Center
Woodruff, Alan; And Others
The major data and findings of a national study of vocational education systems and facilities are presented in this first of a four-volume report. Part I is organized as follows: chapter I describes the present and historical organization of state vocational education administration structures and identifies types of state agency relationships…
Integration Test of the High Voltage Hall Accelerator System Components
NASA Technical Reports Server (NTRS)
Kamhawi, Hani; Haag, Thomas; Huang, Wensheng; Pinero, Luis; Peterson, Todd; Dankanich, John
2013-01-01
NASA Glenn Research Center is developing a 4 kilowatt-class Hall propulsion system for implementation in NASA science missions. NASA science mission performance analysis was completed using the latest high voltage Hall accelerator (HiVHAc) and Aerojet-Rocketdyne's state-of-the-art BPT-4000 Hall thruster performance curves. Mission analysis results indicated that the HiVHAc thruster out performs the BPT-4000 thruster for all but one of the missions studied. Tests of the HiVHAc system major components were performed. Performance evaluation of the HiVHAc thruster at NASA Glenn's vacuum facility 5 indicated that thruster performance was lower than performance levels attained during tests in vacuum facility 12 due to the lower background pressures attained during vacuum facility 5 tests when compared to vacuum facility 12. Voltage-Current characterization of the HiVHAc thruster in vacuum facility 5 showed that the HiVHAc thruster can operate stably for a wide range of anode flow rates for discharge voltages between 250 and 600 volts. A Colorado Power Electronics enhanced brassboard power processing unit was tested in vacuum for 1,500 hours and the unit demonstrated discharge module efficiency of 96.3% at 3.9 kilowatts and 650 volts. Stand-alone open and closed loop tests of a VACCO TRL 6 xenon flow control module were also performed. An integrated test of the HiVHAc thruster, brassboard power processing unit, and xenon flow control module was performed and confirmed that integrated operation of the HiVHAc system major components. Future plans include continuing the maturation of the HiVHAc system major components and the performance of a single-string integration test.
Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Hacker, Scott
2012-01-01
The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.
Aerospace Energy Systems Laboratory - Requirements and design approach
NASA Technical Reports Server (NTRS)
Glover, Richard D.
1988-01-01
The NASA Ames/Dryden Flight Research Facility operates a mixed fleet of research aircraft employing NiCd batteries in a variety of flight-critical applications. Dryden's Battery Systems Laboratory (BSL), a computerized facility for battery maintenance servicing, has evolved over two decades into one of the most advanced facilities of its kind in the world. Recently a major BSL upgrade was initiated with the goal of modernization to provide flexibility in meeting the needs of future advanced projects. The new facility will be called the Aerospace Energy Systems Laboratory (AESL) and will employ distributed processing linked to a centralized data base. AESL will be both a multistation servicing facility and a research laboratory for the advancement of energy storage system maintenance techniques. This paper describes the baseline requirements for the AESL and the design approach being taken for its mechanization.
Crew Systems Laboratory/Building 7. Historical Documentation
NASA Technical Reports Server (NTRS)
Slovinac, Patricia
2011-01-01
Building 7 is managed by the Crew and Thermal Systems Division of the JSC Engineering Directorate. Originally named the Life Systems Laboratory, it contained five major test facilities: two advanced environmental control laboratories and three human-rated vacuum chambers (8 , 11 , and the 20 ). These facilities supported flight crew familiarization and the testing and evaluation of hardware used in the early manned spaceflight programs, including Gemini, Apollo, and the ASTP.
Geothermal-retrofit study for the National Orange Show Facilities in San Bernardino, California
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-11-17
The cost and feasibility of retrofitting the National Orange Show Facilities to use geothermal heat instead of natural gas for heating are determined. Because of the limited usage of the smaller facilities the study was limited to the conversion of the six major buildings: Domed, Hobby, Citrus, Auditorium, Restaurant and Commercial. A major problem is that most of the buildings are used on a very limited basis. This drastically reduced the amount of savings that could be used to amortize the retrofit cost. Another problem is that the buildings are spread over a large area and so the below grademore » piping costs were high. Finally, all of the buildings except for the Auditorium have direct gas fired heaters that would require all new terminal heating systems. In order to limit the retrofit cost, the retrofit system was designed to handle less than the peak load. This seemed appropriate because the facility might not even be in operation when a peak load condition occurred. Also, the existing systems could be used to supplement the geothermal system if necessary. The calculated and design peak loads are summarized.« less
Real-time Stack Monitoring at the BaTek Medical Isotope Production Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
McIntyre, Justin I.; Agusbudiman, A.; Cameron, Ian M.
2016-04-01
Radioxenon emissions from radiopharmaceutical production are a major source of background concentrations affecting the radioxenon detection systems of the International Monitoring System (IMS). Collection of real-time emissions data from production facilities makes it possible to screen out some medical isotope signatures from the IMS radioxenon data sets. This paper describes an effort to obtain and analyze real-time stack emissions data with the design, construction and installation of a small stack monitoring system developed by a joint CTBTO-IDC, BATAN, and PNNL team at the BaTek medical isotope production facility near Jakarta, Indonesia.
Transaction Costs and Cost Breaches in Major Defense Acquisition Programs
2014-02-04
bases, schools, missile storage facilities, maintenance facilities, medical/ dental clinics, libraries, and military family housing (DAU, 2011b...AIM-9_Sidewinder Allison, P. D. (2001). Logistic regression using the SAS system. Cary , NC: SAS Institute. Angelis, D., Dillard, J., Franck, C
Aerospace energy systems laboratory: Requirements and design approach
NASA Technical Reports Server (NTRS)
Glover, Richard D.
1988-01-01
The NASA Ames-Dryden Flight Research Facility at Edwards, California, operates a mixed fleet of research aircraft employing nickel-cadmium (NiCd) batteries in a variety of flight-critical applications. Dryden's Battery Systems Laboratory (BSL), a computerized facility for battery maintenance servicing, has developed over two decades into one of the most advanced facilities of its kind in the world. Recently a major BSL upgrade was initiated with the goal of modernization to provide flexibility in meeting the needs of future advanced projects. The new facility will be called the Aerospace Energy Systems Laboratory (AESL) and will employ distributed processing linked to a centralized data base. AESL will be both a multistation servicing facility and a research laboratory for the advancement of energy storage system maintenance techniques. This paper describes the baseline requirements for the AESL and the design approach being taken for its mechanization.
The cement solidification systems at LANL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Veazey, G.W.
1990-01-01
There are two major cement solidification systems at Los Alamos National Laboratory. Both are focused primarily around treating waste from the evaporator at TA-55, the Plutonium Processing Facility. The evaporator receives the liquid waste stream from TA-55's nitric acid-based, aqueous-processing operations and concentrates the majority of the radionuclides in the evaporator bottoms solution. This is sent to the TA-55 cementation system. The evaporator distillate is sent to the TA-50 facility, where the radionuclides are precipitated and then cemented. Both systems treat TRU-level waste, and so are operated according to the criteria for WIPP-destined waste, but they differ in both cementmore » type and mixing method. The TA-55 systems uses Envirostone, a gypsum-based cement and in-drum prop mixing; the TA-50 systems uses Portland cement and drum tumbling for mixing.« less
Nuclear thermal propulsion test facility requirements and development strategy
NASA Technical Reports Server (NTRS)
Allen, George C.; Warren, John; Clark, J. S.
1991-01-01
The Nuclear Thermal Propulsion (NTP) subpanel of the Space Nuclear Propulsion Test Facilities Panel evaluated facility requirements and strategies for nuclear thermal propulsion systems development. High pressure, solid core concepts were considered as the baseline for the evaluation, with low pressure concepts an alternative. The work of the NTP subpanel revealed that a wealth of facilities already exists to support NTP development, and that only a few new facilities must be constructed. Some modifications to existing facilities will be required. Present funding emphasis should be on long-lead-time items for the major new ground test facility complex and on facilities supporting nuclear fuel development, hot hydrogen flow test facilities, and low power critical facilities.
Maupin, Molly A.; Ivahnenko, Tamara
2011-01-01
Data from the United States Environmental Protection Agency Permit Compliance System national database were used to calculate annual total nitrogen (TN) and total phosphorus (TP) loads to surface waters from municipal and industrial facilities in six major regions of the United States for 1992, 1997, and 2002. Concentration and effluent flow data were examined for approximately 118,250 facilities in 45 states and the District of Columbia. Inconsistent and incomplete discharge locations, effluent flows, and effluent nutrient concentrations limited the use of these data for calculating nutrient loads. More concentrations were reported for major facilities, those discharging more than 1 million gallons per day, than for minor facilities, and more concentrations were reported for TP than for TN. Analytical methods to check and improve the quality of the Permit Compliance System data were used. Annual loads were calculated using "typical pollutant concentrations" to supplement missing concentrations based on the type and size of facilities. Annual nutrient loads for over 26,600 facilities were calculated for at least one of the three years. Sewage systems represented 74% of all TN loads and 58% of all TP loads. This work represents an initial set of data to develop a comprehensive and consistent national database of point-source nutrient loads. These loads can be used to inform a wide range of water-quality management, watershed modeling, and research efforts at multiple scales.
Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Salinas, Michael J.
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Horak, W.C.; Reisman, A.; Purvis, E.E. III
1997-07-01
The Soviet Union established a system of specialized regional facilities to dispose of radioactive waste generated by sources other than the nuclear fuel cycle. The system had 16 facilities in Russia, 5 in Ukraine, one in each of the other CIS states, and one in each of the Baltic Republics. These facilities are still being used. The major generators of radioactive waste they process these are research and industrial organizations, medical and agricultural institution and other activities not related to nuclear power. Waste handled by these facilities is mainly beta- and gamma-emitting nuclides with half lives of less than 30more » years. The long-lived and alpha-emitting isotopic content is insignificant. Most of the radwaste has low and medium radioactivity levels. The facilities also handle spent radiation sources, which are highly radioactive and contain 95-98 percent of the activity of all the radwaste buried at these facilities.« less
NASA Johnson Space Center: White Sands Test Facility
NASA Technical Reports Server (NTRS)
Aggarwal, Pravin; Kowalski, Robert R.
2011-01-01
This slide presentation reviews the testing facilities and laboratories available at the White Sands Test Facility (WSTF). The mission of WSTF is to provide the expertise and infrastructure to test and evaluate spacecraft materials, components and propulsion systems that enable the safe exploration and use of space. There are nine rocket test stands in two major test areas, six altitude test stands, three ambient test stands,
ERIC Educational Resources Information Center
Mercer, Walter A.
Major features of the cooperative student teaching model include 1) a pattern of student teaching assignments within the school system which would provide for proportional inclusion of prospective teachers--from the nearby majority black university and the nearby majority white university--to each school serving as a student teaching facility; 2)…
CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ted Berglund; Jeffrey T. Ranney; Carol L. Babb
2001-04-01
The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of municipal solid waste (MSW) feed material was procured. During this quarter (first quarter of 2001), shredding of the feed material was completedmore » and final feed conditioning was completed. Pilot facility hydrolysis production was completed to produce lignin for co-fire testing. Pilot facility modifications continued to improve facility operations and performance during the first quarter of 2001. Samples of the co-fire fuel material were sent to the co-fire facility for evaluation. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system is being developed.« less
Use of the Homeland-Defense Operational Planning System (HOPS) for Emergency Management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durling, Jr., R L; Price, D E
2005-12-16
The Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging Lawrence Livermore National Laboratory's expertise in weapons systems and in sparse information analysis to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors,more » HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.« less
Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Price, D E; Durling, R L
2005-10-10
The Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging Lawrence Livermore National Laboratory's expertise in weapons systems and in sparse information analysis to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors,more » HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.« less
Numerical aerodynamic simulation facility preliminary study: Executive study
NASA Technical Reports Server (NTRS)
1977-01-01
A computing system was designed with the capability of providing an effective throughput of one billion floating point operations per second for three dimensional Navier-Stokes codes. The methodology used in defining the baseline design, and the major elements of the numerical aerodynamic simulation facility are described.
1996-11-01
As the trend to mergers and diversification of healthcare facilities grows, so too does the challenge to security directors to effectively and efficiently protect not only acute care, emergency, and outpatient facilities, but physician office buildings, parking garages, long-term-care units, medical schools, technical service units, and even health clubs. Besides the different security and communications problems posed by each type of facility, the problem of distance between facilities and their geographic location must also be met. In this report, we'll update you on the approaches being taken by security and planning executives at three leading health systems and how they are dealing with current and future problems.
Space Station Freedom CHeCS overview. [Crew Health Care System
NASA Technical Reports Server (NTRS)
Boyce, Joey B.
1990-01-01
The current status, progress, and future plans for development of the Crew Health Care System (CHeCS) for the International Space Station Freedom are presented. Essential operational biomedical support requirements for the astronauts, including medical care, environmental habitat monitoring, and countermeasures for the potentially maladaptive physiological effects of space flight will be provided by the CHeCS. Three integral parts will make up the system: a health maintenance facility, an environmental health system, and the exercise countermeasures facility. Details of each of the major systems and their subsystems are presented.
Standard services for the capture, processing, and distribution of packetized telemetry data
NASA Technical Reports Server (NTRS)
Stallings, William H.
1989-01-01
Standard functional services for the capture, processing, and distribution of packetized data are discussed with particular reference to the future implementation of packet processing systems, such as those for the Space Station Freedom. The major functions are listed under the following major categories: input processing, packet processing, and output processing. A functional block diagram of a packet data processing facility is presented, showing the distribution of the various processing functions as well as the primary data flow through the facility.
Major system acquisitions process (A-109)
NASA Technical Reports Server (NTRS)
Saric, C.
1991-01-01
The Major System examined is a combination of elements (hardware, software, facilities, and services) that function together to produce capabilities required to fulfill a mission need. The system acquisition process is a sequence of activities beginning with documentation of mission need and ending with introduction of major system into operational use or otherwise successful achievement of program objectives. It is concluded that the A-109 process makes sense and provides a systematic, integrated management approach along with appropriate management level involvement and innovative and 'best ideas' from private sector in satisfying mission needs.
ERIC Educational Resources Information Center
Greven, Erik D. W.; Knox, Winthrop S.
1999-01-01
Discusses each of the major system components of a maintenance survey that can provide pool facilities with the information needed to properly maintain aging pools. Components examined include mechanical and structural systems; pool structure; and the filtration, circulation, and chemical treatment systems. (GR)
Laboratory Resources Management in Manufacturing Systems Programs
ERIC Educational Resources Information Center
Obi, Samuel C.
2004-01-01
Most, if not all, industrial technology (IT) programs have laboratories or workshops. Often equipped with modern equipment, tools, materials, and measurement and test instruments, these facilities constitute a major investment for IT programs. Improper use or over use of program facilities may result in dirty lab equipment, lost or damaged tools,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCallen, David; Petrone, Floriana; Buckle, Ian
The U.S. Department of Energy (DOE) has ownership and operational responsibility for a large enterprise of nuclear facilities that provide essential functions to DOE missions ranging from national security to discovery science and energy research. These facilities support a number of DOE programs and offices including the National Nuclear Security Administration, Office of Science, and Office of Environmental Management. With many unique and “one of a kind” functions, these facilities represent a tremendous national investment, and assuring their safety and integrity is fundamental to the success of a breadth of DOE programs. Many DOE critical facilities are located in regionsmore » with significant natural phenomenon hazards including major earthquakes and DOE has been a leader in developing standards for the seismic analysis of nuclear facilities. Attaining and sustaining excellence in nuclear facility design and management must be a core competency of the DOE. An important part of nuclear facility management is the ability to monitor facilities and rapidly assess the response and integrity of the facilities after any major upset event. Experience in the western U.S. has shown that understanding facility integrity after a major earthquake is a significant challenge which, lacking key data, can require extensive effort and significant time. In the work described in the attached report, a transformational approach to earthquake monitoring of facilities is described and demonstrated. An entirely new type of optically-based sensor that can directly and accurately measure the earthquake-induced deformations of a critical facility has been developed and tested. This report summarizes large-scale shake table testing of the sensor concept on a representative steel frame building structure, and provides quantitative data on the accuracy of the sensor measurements.« less
NASA directory of observation station locations, volume 1
NASA Technical Reports Server (NTRS)
1973-01-01
Geodetic information for NASA tracking stations and for observation stations cooperating in NASA geodetic satellite programs is presented. A Geodetic Data Sheet is provided for each station, giving the position of the station and describing briefly how it was established. Geodetic positions and geocentric coordinates of these stations are tabulated on local or major geodetic datums and on selected world geodetic systems. The principal tracking facilities used by NASA, including the Spaceflight Tracking and Data Network, the Deep Space Network, and several large radio telescopes are discussed. Positions of these facilities are tabulated on their local or national datums, the Mercury Spheroid 1960, the Modified Mercury Datum 1968, and the Spaceflight Tracking and Data Network System. Observation stations in the NASA Geodetic Satellites Program are included along with stations participating in the National Geodetic Satellite Program. Positions of these facilities are given on local or preferred major datums, and on the Modified Mercury Datum 1968.
The aerospace energy systems laboratory: Hardware and software implementation
NASA Technical Reports Server (NTRS)
Glover, Richard D.; Oneil-Rood, Nora
1989-01-01
For many years NASA Ames Research Center, Dryden Flight Research Facility has employed automation in the servicing of flight critical aircraft batteries. Recently a major upgrade to Dryden's computerized Battery Systems Laboratory was initiated to incorporate distributed processing and a centralized database. The new facility, called the Aerospace Energy Systems Laboratory (AESL), is being mechanized with iAPX86 and iAPX286 hardware running iRMX86. The hardware configuration and software structure for the AESL are described.
Report of the Task Force on SSC Magnet System Test Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1984-10-01
The Task Force on SSC Magnet Systems test Site was appointed by Maury Tigner, Director of the SSC, Phase 1 in August 1984. In brief, the charge asked the Task Force to make a critical evaluation of potential test sites for a major SSC magnet System Test Facility (STF) with regard to: (1) availability of the needed space, utilities, staff and other requirements on the desired time scale; and (2) the cost of preparing the sites for the tests and for operating the facilities during the test period. The charge further suggests that, by virtue of existing facilities and availabilitymore » of experienced staff, BNL and FNAL are the two best candidate sites and that is therefore appears appropriate to restrict the considerations of the Task Force to these sites. During the subsequent deliberations of the Task Force, no new facts were revealed that altered the assumptions of the charge in this regard. The charge does not ask for a specific site recommendation for the STF. Indeed, an agreement on such a recommendation would be difficult to achieve considering the composition of the Task Force, wherein a large fraction of the membership is drawn from the two contending laboratories. Instead, we have attempted to describe the purpose of the facility, outline a productive test program, list the major facilities required, carefully review the laboratories` responses to the facility requirements, and make objective comparisons of the specific features and capabilities offered.« less
NASA Technical Reports Server (NTRS)
Schneider, Steven P.
1990-01-01
Since Ludwieg tubes have been around for many years, and NASA has already established the feasibility of creating quiet-flow wind tunnels, the major question addressed was the cost of the proposed facility. Cost estimates were obtained for major system components, and new designs which allowed fabrication at lower cost were developed. A large fraction of the facility cost comes from the fabrication of the highly polished quiet-flow supersonic nozzle. Methods for the design of this nozzle were studied at length in an attempt to find an effective but less expensive design. Progress was sufficient to show that a quality facility can be fabricated at a reasonable cost.
NASA Astrophysics Data System (ADS)
Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Bale, S.; Carter, T.; Crocker, N.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.; Chen, Y.; Cutler, R.; Fox, W.; Heitzenroeder, P.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.
2015-11-01
Various regimes or ``phases'' are identified in a magnetic reconnection ``phase diagram'' which classifies different coupling mechanisms from the global system scales to the local dissipation scales. The FLARE device (http://flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton to provide access to all of these phases directly relevant to space, solar, astrophysical, and fusion plasmas. Study of plasma energization during magnetic reconnection is one of major topics for the FLARE facility, which is planned to be a user facility. The motivating major physics questions regarding plasma energization and the planned collaborative research on these topics will be presented and discussed. Supported by NSF.
Status Report for the Hypervelocity Free-Flight Aerodynamic Facility
NASA Technical Reports Server (NTRS)
Cornelison, Charles J.; Arnold, James O. (Technical Monitor)
1997-01-01
The Hypervelocity Free-Flight Aerodynamic Facility, located at Ames Research Center, is NASA's only aeroballistic facility. During 1997, its model imaging and time history recording systems were the focus of a major refurbishment effort. Specifically the model detection, spark gap (light source); Kerr cell (high speed shuttering); and interval timer sub-systems were inspected, repaired, modified or replaced as required. These refurbishment efforts have fully restored the HFFAF's capabilities to a much better condition, comparable to what it was 15 years ago. Details of this refurbishment effort along with a brief discussion of future upgrade plans are presented.
Limited-scope probabilistic safety analysis for the Los Alamos Meson Physics Facility (LAMPF)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sharirli, M.; Rand, J.L.; Sasser, M.K.
1992-01-01
The reliability of instrumentation and safety systems is a major issue in the operation of accelerator facilities. A probabilistic safety analysis was performed or the key safety and instrumentation systems at the Los Alamos Meson Physics Facility (LAMPF). in Phase I of this unique study, the Personnel Safety System (PSS) and the Current Limiters (XLs) were analyzed through the use of the fault tree analyses, failure modes and effects analysis, and criticality analysis. Phase II of the program was done to update and reevaluate the safety systems after the Phase I recommendations were implemented. This paper provides a brief reviewmore » of the studies involved in Phases I and II of the program.« less
Limited-scope probabilistic safety analysis for the Los Alamos Meson Physics Facility (LAMPF)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sharirli, M.; Rand, J.L.; Sasser, M.K.
1992-12-01
The reliability of instrumentation and safety systems is a major issue in the operation of accelerator facilities. A probabilistic safety analysis was performed or the key safety and instrumentation systems at the Los Alamos Meson Physics Facility (LAMPF). in Phase I of this unique study, the Personnel Safety System (PSS) and the Current Limiters (XLs) were analyzed through the use of the fault tree analyses, failure modes and effects analysis, and criticality analysis. Phase II of the program was done to update and reevaluate the safety systems after the Phase I recommendations were implemented. This paper provides a brief reviewmore » of the studies involved in Phases I and II of the program.« less
Conceptual design of the MHD Engineering Test Facility
NASA Technical Reports Server (NTRS)
Bents, D. J.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Rigo, H. S.; Pearson, C. V.; Warinner, D. K.; Hatch, A. M.; Borden, M.; Giza, D. A.
1981-01-01
The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.
Construction of the Propulsion Systems Laboratory No. 1 and 2
1951-01-21
Construction of the Propulsion Systems Laboratory No. 1 and 2 at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. When it began operation in late 1952, the Propulsion Systems Laboratory was the NACA’s most powerful facility for testing full-scale engines at simulated flight altitudes. The facility contained two altitude simulating test chambers which were a technological combination of the static sea-level test stands and the complex Altitude Wind Tunnel, which recreated actual flight conditions on a larger scale. NACA Lewis began designing the new facility in 1947 as part of a comprehensive plan to improve the altitude testing capabilities across the lab. The exhaust, refrigeration, and combustion air systems from all the major test facilities were linked. In this way, different facilities could be used to complement the capabilities of one another. Propulsion Systems Laboratory construction began in late summer 1949 with the installation of an overhead exhaust pipe connecting the facility to the Altitude Wind Tunnel and Engine Research Building. The large test section pieces arriving in early 1951, when this photograph was taken. The two primary coolers for the altitude exhaust are in place within the framework near the center of the photograph.
Automated survey of 8000 plan checks at eight facilities.
Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph
2016-09-01
To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.
Integration of functional safety systems on the Daniel K. Inouye Solar Telescope
NASA Astrophysics Data System (ADS)
Williams, Timothy R.; Hubbard, Robert P.; Shimko, Steve
2016-07-01
The Daniel K. Inouye Solar Telescope (DKIST) was envisioned from an early stage to incorporate a functional safety system to ensure the safety of personnel and equipment within the facility. Early hazard analysis showed the need for a functional safety system. The design used a distributed approach in which each major subsystem contains a PLC-based safety controller. This PLC-based system complies with the latest international standards for functional safety. The use of a programmable controller also allows for flexibility to incorporate changes in the design of subsystems without adversely impacting safety. Various subsystems were built by different contractors and project partners but had to function as a piece of the overall control system. Using distributed controllers allows project contractors and partners to build components as standalone subsystems that then need to be integrated into the overall functional safety system. Recently factory testing was concluded on the major subsystems of the facility. Final integration of these subsystems is currently underway on the site. Building on lessons learned in early factory tests, changes to the interface between subsystems were made to improve the speed and ease of integration of the entire system. Because of the distributed design each subsystem can be brought online as it is delivered and assembled rather than waiting until the entire facility is finished. This enhances safety during the risky period of integration and testing. The DKIST has implemented a functional safety system that has allowed construction of subsystems in geographically diverse locations but that function cohesively once they are integrated into the facility currently under construction.
14 CFR 125.287 - Initial and recurrent pilot testing requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., instrument approach facilities and procedures; (5) Air traffic control procedures, including IFR procedures... certificate holder; (2) For each type of airplane to be flown by the pilot, the airplane powerplant, major components and systems, major appliances, performance and operating limitations, standard and emergency...
STAF: A Powerful and Sophisticated CAI System.
ERIC Educational Resources Information Center
Loach, Ken
1982-01-01
Describes the STAF (Science Teacher's Authoring Facility) computer-assisted instruction system developed at Leeds University (England), focusing on STAF language and major program features. Although programs for the system emphasize physical chemistry and organic spectroscopy, the system and language are general purpose and can be used in any…
LANDSAT D data processing facility study
NASA Technical Reports Server (NTRS)
1976-01-01
Mission planning of the LANDSAT D is discussed which will present several major advances in the spacecraft, sensor (Thematic Mapper), ground systems and overall system design. The system provides for two data links-direct satellite to ground, and via the Tracking and Data Relay Satellite.
Low thrust rocket test facility
NASA Technical Reports Server (NTRS)
Arrington, Lynn A.; Schneider, Steven J.
1990-01-01
A low thrust chemical rocket test facility has recently become operational at the NASA-Lewis. The new facility is used to conduct both long duration and performance tests at altitude over a thruster's operating envelope using hydrogen and oxygen gas for propellants. The facility provides experimental support for a broad range of objectives, including fundamental modeling of fluids and combustion phenomena, the evaluation of thruster components, and life testing of full rocket designs. The major mechanical and electrical systems are described along with aspects of the various optical diagnostics available in the test cell. The electrical and mechanical systems are designed for low down time between tests and low staffing requirements for test operations. Initial results are also presented which illustrate the various capabilities of the cell.
[The challenges of sustainable development in healthcare facilities].
Mourgues, François; Muret, Jane; Pauchard, Jean-Claude
2018-03-01
Healthcare and medical-social facilities have a major responsibility within society, that of the quality of care, but also that of developing a system of sustainable and socially-responsible health. This system must meet the three pillars which constitute such an approach: economic, social and environmental sustainability. Innovation remains central to the sustainable evolution of practices and the first results are now visible. Copyright © 2018 Elsevier Masson SAS. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chatterton, Mike
The Recovery Act: Districtwide Geothermal Heating Conversion project performed by the Blaine County School District was part of a larger effort by the District to reduce operating costs, address deferred maintenance items, and to improve the learning environment of the students. This project evaluated three options for the ground source which were Open-Loop Extraction/Re-injection wells, Closed-Loop Vertical Boreholes, and Closed-Loop Horizontal Slinky approaches. In the end the Closed-Loop Horizontal Slinky approach had the lowest total cost of ownership but the majority of the sites associated with this project did not have enough available ground area to install the system somore » the second lowest option was used (Open-Loop). In addition to the ground source, this project looked at ways to retrofit existing HVAC systems with new high efficiency systems. The end result was the installation of distributed waterto- air heat pumps with water-to-water heat pumps installed to act as boilers/chillers for areas with a high ventilation demand such as they gymnasiums. A number of options were evaluated and the lowest total cost of ownership approach was implemented in the majority of the facilities. The facilities where the lowest total cost of ownership approaches was not selected were done to maintain consistency of the systems from facility to facility. This project had a number of other benefits to the Blaine County public. The project utilizes guaranteed energy savings to justify the levy funds expended. The project also developed an educational dashboard that can be used in the classrooms and to educate the community on the project and its performance. In addition, the majority of the installation work was performed by contractors local to Blaine County which acted as an economic stimulus to the area during a period of recession.« less
Definition of avionics concepts for a heavy lift cargo vehicle, appendix A
NASA Technical Reports Server (NTRS)
1989-01-01
The major objective of the study task was to define a cost effective, multiuser simulation, test, and demonstration facility to support the development of avionics systems for future space vehicles. This volume provides the results of the main simulation processor selection study and describes some proof-of-concept demonstrations for the avionics test bed facility.
Nutrient Loadings to Streams of the Continental United States from Municipal and Industrial Effluent
Maupin, M.A.; Ivahnenko, T.
2011-01-01
Data from the United States Environmental Protection Agency Permit Compliance System national database were used to calculate annual total nitrogen (TN) and total phosphorus (TP) loads to surface waters from municipal and industrial facilities in six major regions of the United States for 1992, 1997, and 2002. Concentration and effluent flow data were examined for approximately 118,250 facilities in 45 states and the District of Columbia. Inconsistent and incomplete discharge locations, effluent flows, and effluent nutrient concentrations limited the use of these data for calculating nutrient loads. More concentrations were reported for major facilities, those discharging more than 1million gallons per day, than for minor facilities, and more concentrations were reported for TP than for TN. Analytical methods to check and improve the quality of the Permit Compliance System data were used. Annual loads were calculated using "typical pollutant concentrations" to supplement missing concentrations based on the type and size of facilities. Annual nutrient loads for over 26,600 facilities were calculated for at least one of the three years. Sewage systems represented 74% of all TN loads and 58% of all TP loads. This work represents an initial set of data to develop a comprehensive and consistent national database of point-source nutrient loads. These loads can be used to inform a wide range of water-quality management, watershed modeling, and research efforts at multiple scales. ?? 2011 American Water Resources Association. This article is a U.S. Government work and is in the public domain in the USA.
14 CFR 415.109 - Launch description.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) Identification of any facilities at the launch site that will be used for launch processing and flight. (b... dimensions and weight; (iii) Location of all safety critical systems, including any flight termination hardware, tracking aids, or telemetry systems; (iv) Location of all major launch vehicle control systems...
14 CFR 415.109 - Launch description.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) Identification of any facilities at the launch site that will be used for launch processing and flight. (b... dimensions and weight; (iii) Location of all safety critical systems, including any flight termination hardware, tracking aids, or telemetry systems; (iv) Location of all major launch vehicle control systems...
14 CFR 415.109 - Launch description.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) Identification of any facilities at the launch site that will be used for launch processing and flight. (b... dimensions and weight; (iii) Location of all safety critical systems, including any flight termination hardware, tracking aids, or telemetry systems; (iv) Location of all major launch vehicle control systems...
2003-08-27
KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician moves a switch. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”
2003-08-27
KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician turns on a switch. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”
National space test centers - Lewis Research Center Facilities
NASA Technical Reports Server (NTRS)
Roskilly, Ronald R.
1990-01-01
The Lewis Research Center, NASA, presently has a number of test facilities that constitute a significant national space test resource. It is expected this capability will continue to find wide application in work involving this country's future in space. Testing from basic research to applied technology, to systems development, to ground support will be performed, supporting such activities as Space Station Freedom, the Space Exploration Initiative, Mission to Planet Earth, and many others. The major space test facilities at both Cleveland and Lewis' Plum Brook Station are described. Primary emphasis is on space propulsion facilities; other facilities of importance in space power and microgravity are also included.
Ground test facility for SEI nuclear rocket engines
NASA Astrophysics Data System (ADS)
Harmon, Charles D.; Ottinger, Cathy A.; Sanchez, Lawrence C.; Shipers, Larry R.
1992-07-01
Nuclear (fission) thermal propulsion has been identified as a critical technology for a manned mission to Mars by the year 2019. Facilities are required that will support ground tests to qualify the nuclear rocket engine design, which must support a realistic thermal and neutronic environment in which the fuel elements will operate at a fraction of the power for a flight weight reactor/engine. This paper describes the design of a fuel element ground test facility, with a strong emphasis on safety and economy. The details of major structures and support systems of the facility are discussed, and a design diagram of the test facility structures is presented.
Communication Systems Simulation Laboratory (CSSL): Simulation Planning Guide
NASA Technical Reports Server (NTRS)
Schlesinger, Adam
2012-01-01
The simulation process, milestones and inputs are unknowns to first-time users of the CSSL. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.
Systems Engineering Simulator (SES) Simulator Planning Guide
NASA Technical Reports Server (NTRS)
McFarlane, Michael
2011-01-01
The simulation process, milestones and inputs are unknowns to first-time users of the SES. The Simulator Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.
Scholz, Stefan; Ngoli, Baltazar; Flessa, Steffen
2015-05-01
Health care infrastructure constitutes a major component of the structural quality of a health system. Infrastructural deficiencies of health services are reported in literature and research. A number of instruments exist for the assessment of infrastructure. However, no easy-to-use instruments to assess health facility infrastructure in developing countries are available. Present tools are not applicable for a rapid assessment by health facility staff. Therefore, health information systems lack data on facility infrastructure. A rapid assessment tool for the infrastructure of primary health care facilities was developed by the authors and pilot-tested in Tanzania. The tool measures the quality of all infrastructural components comprehensively and with high standardization. Ratings use a 2-1-0 scheme which is frequently used in Tanzanian health care services. Infrastructural indicators and indices are obtained from the assessment and serve for reporting and tracing of interventions. The tool was pilot-tested in Tanga Region (Tanzania). The pilot test covered seven primary care facilities in the range between dispensary and district hospital. The assessment encompassed the facilities as entities as well as 42 facility buildings and 80 pieces of technical medical equipment. A full assessment of facility infrastructure was undertaken by health care professionals while the rapid assessment was performed by facility staff. Serious infrastructural deficiencies were revealed. The rapid assessment tool proved a reliable instrument of routine data collection by health facility staff. The authors recommend integrating the rapid assessment tool in the health information systems of developing countries. Health authorities in a decentralized health system are thus enabled to detect infrastructural deficiencies and trace the effects of interventions. The tool can lay the data foundation for district facility infrastructure management.
Desale, Adino; Taye, Bineyam; Belay, Getachew; Nigatu, Alemayehu
2013-01-01
Logistics management information system for health commodities remained poorly implemented in most of developing countries. To assess the status of laboratory logistics management information system for HIV/AIDS and tuberculosis laboratory commodities in public health facilities in Addis Ababa. A cross-sectional descriptive study was conducted from September 2010-January 2011 at selected public health facilities. A stratified random sampling method was used to include a total of 43 facilities which, were investigated through quantitative methods using structured questionnaires interviews. Focus group discussion with the designated supply chain managers and key informant interviews were conducted for the qualitative method. There exists a well-designed logistics system for laboratory commodities with trained pharmacy personnel, distributed standard LMIS formats and established inventory control procedures. However, majority of laboratory professionals were not trained in LMIS. Majority of the facilities (60.5%) were stocked out for at least one ART monitoring and TB laboratory reagents and the highest stock out rate was for chemistry reagents. Expired ART monitoring laboratory commodities were found in 25 (73.5%) of facilities. Fifty percent (50%) of the assessed hospitals and 54% of health centers were currently using stock/bin cards for all HIV/AIDS and TB laboratory commodities in main pharmacy store, among these only 25% and 20.8% of them were updated with accurate information matching with the physical count done at the time of visit for hospitals and health centers respectively. Even though there exists a well designed laboratory LMIS, keeping quality stock/bin cards and LMIS reports were very low. Key ART monitoring laboratory commodities were stock out at many facilities at the day of visit and during the past six months. Based on findings, training of laboratory personnel's managing laboratory commodities and keeping accurate inventory control procedures were recommended.
Desale, Adino; Taye, Bineyam; Belay, Getachew; Nigatu, Alemayehu
2013-01-01
Introduction Logistics management information system for health commodities remained poorly implemented in most of developing countries. To assess the status of laboratory logistics management information system for HIV/AIDS and tuberculosis laboratory commodities in public health facilities in Addis Ababa. Methods A cross-sectional descriptive study was conducted from September 2010-January 2011 at selected public health facilities. A stratified random sampling method was used to include a total of 43 facilities which, were investigated through quantitative methods using structured questionnaires interviews. Focus group discussion with the designated supply chain managers and key informant interviews were conducted for the qualitative method. Results There exists a well-designed logistics system for laboratory commodities with trained pharmacy personnel, distributed standard LMIS formats and established inventory control procedures. However, majority of laboratory professionals were not trained in LMIS. Majority of the facilities (60.5%) were stocked out for at least one ART monitoring and TB laboratory reagents and the highest stock out rate was for chemistry reagents. Expired ART monitoring laboratory commodities were found in 25 (73.5%) of facilities. Fifty percent (50%) of the assessed hospitals and 54% of health centers were currently using stock/bin cards for all HIV/AIDS and TB laboratory commodities in main pharmacy store, among these only 25% and 20.8% of them were updated with accurate information matching with the physical count done at the time of visit for hospitals and health centers respectively. Conclusion Even though there exists a well designed laboratory LMIS, keeping quality stock/bin cards and LMIS reports were very low. Key ART monitoring laboratory commodities were stock out at many facilities at the day of visit and during the past six months. Based on findings, training of laboratory personnel's managing laboratory commodities and keeping accurate inventory control procedures were recommended. PMID:24106574
24 CFR 982.605 - SRO: Housing quality standards.
Code of Federal Regulations, 2013 CFR
2013-04-01
... an SRO unit without passing through any other unit. (4) Sprinkler system. A sprinkler system that protects all major spaces, hard wired smoke detectors, and such other fire and safety improvements as State... utilize an approvable public or private disposal system. (E) Sanitary facilities must be reasonably...
24 CFR 982.605 - SRO: Housing quality standards.
Code of Federal Regulations, 2012 CFR
2012-04-01
... an SRO unit without passing through any other unit. (4) Sprinkler system. A sprinkler system that protects all major spaces, hard wired smoke detectors, and such other fire and safety improvements as State... utilize an approvable public or private disposal system. (E) Sanitary facilities must be reasonably...
24 CFR 982.605 - SRO: Housing quality standards.
Code of Federal Regulations, 2014 CFR
2014-04-01
... an SRO unit without passing through any other unit. (4) Sprinkler system. A sprinkler system that protects all major spaces, hard wired smoke detectors, and such other fire and safety improvements as State... utilize an approvable public or private disposal system. (E) Sanitary facilities must be reasonably...
24 CFR 982.605 - SRO: Housing quality standards.
Code of Federal Regulations, 2011 CFR
2011-04-01
... an SRO unit without passing through any other unit. (4) Sprinkler system. A sprinkler system that protects all major spaces, hard wired smoke detectors, and such other fire and safety improvements as State... utilize an approvable public or private disposal system. (E) Sanitary facilities must be reasonably...
LANDSAT D user data processing study
NASA Technical Reports Server (NTRS)
1976-01-01
The major expected users of the LANDSAT D system and a preliminary system design of their required facilities are investigated. This system design will then be costed in order to provide an estimate of the incremental user costs necessitated by LANDSAT D. One major use of these cost estimates is as part of an overall economic cost/benefit argument being developed for the LANDSAT D system. The implication of this motive is key; the system design (and corresponding cost estimates) must be a credible one, but not necessarily an optimum one.
Burden of Clostridium difficile on the healthcare system.
Dubberke, Erik R; Olsen, Margaret A
2012-08-01
There are few high-quality studies of the costs of Clostridium difficile infection (CDI), and the majority of studies focus on the costs of CDI in acute-care facilities. Analysis of the best available data, from 2008, indicates that CDI may have resulted in $4.8 billion in excess costs in US acute-care facilities. Other areas of CDI-attributable excess costs that need to be investigated are costs of increased discharges to long-term care facilities, of CDI with onset in long-term care facilities, of recurrent CDI, and of additional adverse events caused by CDI.
Boeing infrared sensor (BIRS) calibration facility
NASA Technical Reports Server (NTRS)
Hazen, John D.; Scorsone, L. V.
1990-01-01
The Boeing Infrared Sensor (BIRS) Calibration Facility represents a major capital investment in optical and infrared technology. The facility was designed and built for the calibration and testing of the new generation large aperture long wave infrared (LWIR) sensors, seekers, and related technologies. Capability exists to perform both radiometric and goniometric calibrations of large infrared sensors under simulated environmental operating conditions. The system is presently configured for endoatmospheric calibrations with a uniform background field which can be set to simulate the expected mission background levels. During calibration, the sensor under test is also exposed to expected mission temperatures and pressures within the test chamber. Capability exists to convert the facility for exoatmospheric testing. The configuration of the system is described along with hardware elements and changes made to date are addressed.
Westhoff, L J; Schaefer, J C
1993-05-01
The Catholic Health Association's 1992 survey of Catholic long-term care (LTC) facilities identified five broad issues LTC facilities face in the 1990s: leadership, system affiliation, community programs, resident issues, and care of persons with AIDS. The transition to lay leadership presents new challenges to the relationship between LTC facilities and their sponsors. Despite the dominance of religious sponsors, an increasing number of laypersons are serving as healthcare administrators both in long-term and acute care. Thirty percent of respondents reported being affiliated with a multi-institutional system. This percentage has changed little in the past few years, although the number of facilities that are system members continues to increase at the fastest rate of any type of LTC facility. Only 27 percent of survey respondents said they provide educational or informational programs for persons in their communities. Thirty-nine percent of system-affiliated LTC facilities reported offering such programs. One encouraging finding shows that 80 percent of facilities have written policies for living wills, 64 percent for designated proxy, and 86 percent for durable power of attorney for healthcare. LTC providers are struggling to determine their role in caring for persons with HIV and AIDS. Only 3.6 percent of respondents care for residents with AIDS. A major problem LTC administrators face is a fear of potential infection of staff or residents.
Government conceptual estimating for contracting and management
NASA Technical Reports Server (NTRS)
Brown, J. A.
1986-01-01
The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.
An easy-to-use diagnostic system development shell
NASA Technical Reports Server (NTRS)
Tsai, L. C.; Ross, J. B.; Han, C. Y.; Wee, W. G.
1987-01-01
The Diagnostic System Development Shell (DSDS), an expert system development shell for diagnostic systems, is described. The major objective of building the DSDS is to create a very easy to use and friendly environment for knowledge engineers and end-users. The DSDS is written in OPS5 and CommonLisp. It runs on a VAX/VMS system. A set of domain independent, generalized rules is built in the DSDS, so the users need not be concerned about building the rules. The facts are explicitly represented in a unified format. A powerful check facility which helps the user to check the errors in the created knowledge bases is provided. A judgement facility and other useful facilities are also available. A diagnostic system based on the DSDS system is question driven and can call or be called by other knowledge based systems written in OPS5 and CommonLisp. A prototype diagnostic system for diagnosing a Philips constant potential X-ray system has been built using the DSDS.
Environmental Control and Life Support Systems Test Facility at MSFC
NASA Technical Reports Server (NTRS)
2001-01-01
The Marshall Space Flight Center (MSFC) is responsible for designing and building the life support systems that will provide the crew of the International Space Station (ISS) a comfortable environment in which to live and work. Scientists and engineers at the MSFC are working together to provide the ISS with systems that are safe, efficient, and cost-effective. These compact and powerful systems are collectively called the Environmental Control and Life Support Systems, or simply, ECLSS. In this photograph, the life test area on the left of the MSFC ECLSS test facility is where various subsystems and components are tested to determine how long they can operate without failing and to identify components needing improvement. Equipment tested here includes the Carbon Dioxide Removal Assembly (CDRA), the Urine Processing Assembly (UPA), the mass spectrometer filament assemblies and sample pumps for the Major Constituent Analyzer (MCA). The Internal Thermal Control System (ITCS) simulator facility (in the module in the right) duplicates the function and operation of the ITCS in the ISS U.S. Laboratory Module, Destiny. This facility provides support for Destiny, including troubleshooting problems related to the ITCS.
NASA Technical Reports Server (NTRS)
Badgley, R. H.; Fleming, D. P.; Smalley, A. J.
1975-01-01
A program for the development and verification of drive-train dynamic technology is described along with its basis and the results expected from it. A central feature of this program is a drive-train test facility designed for the testing and development of advanced drive-train components, including shaft systems, dampers, and couplings. Previous efforts in designing flexible dynamic drive-train systems are reviewed, and the present state of the art is briefly summarized. The design of the test facility is discussed with major attention given to the formulation of the test-rig concept, dynamic scaling of model shafts, and the specification of design parameters. Specific efforts envisioned for the test facility are briefly noted, including evaluations of supercritical test shafts, stability thresholds for various sources and types of instabilities that can exist in shaft systems, effects of structural flexibility on the dynamic performance of dampers, and methods for vibration control in two-level and three-level flexible shaft systems.
NASA Technical Reports Server (NTRS)
Pool, Sam Lee
1988-01-01
Because the prolonged stay on board the Space Station will increase the risk of possible inflight medical problems from that on Skylab missions, the Health Maintenance Facility (HMF) planned for the Space Station is much more sophisticated than the small clinics of the Skylab missions. The development of the HMF is directed by the consideration of three primary factors: prevention, diagnosis, and treatment of injuries and illnesses that may occur in flight. The major components of the HMF include the clinical laboratory, pharmacy, imaging system, critical-care system, patient-restraint system, data-management system, exercise system, surgical system, electrophysiologic-monitoring system, introvenous-fluid system, dental system, and hyperbaric-treatment-support system.
HYDRA, a new tool for mechanical testing
NASA Technical Reports Server (NTRS)
Brinkmann, P. W.
1994-01-01
The introduction outlines the verification concept for programs of the European Space Agency (ESA). The role of the Agency in coordinating the activities of major European space test centers is summarized. Major test facilities of the environmental test center at ESTEC, the Space Research and Technology Center of ESA, are shown and their specific characteristics are highlighted with special emphasis on the 6-degree-of-freedom (6-DOF) hydraulic shaker. The specified performance characteristics for sine and transient tests are presented. Results of single-axis hardware tests and 6-DOF computer simulations are included. Efforts employed to protect payloads against accidental damage in case of malfunctions of the facility are listed. Finally the operational advantages of the facility, as well as the possible use of the HYDRA control system design for future applications are indicated.
A Medical Decision Support System for the Space Station Health Maintenance Facility
Ostler, David V.; Gardner, Reed M.; Logan, James S.
1988-01-01
NASA is developing a Health Maintenance Facility (HMF) to provide the equipment and supplies necessary to deliver medical care in the Space Station. An essential part of the Health Maintenance Facility is a computerized Medical Decision Support System (MDSS) that will enhance the ability of the medical officer (“paramedic” or “physician”) to maintain the crew's health, and to provide emergency medical care. The computer system has four major functions: 1) collect and integrate medical information into an electronic medical record from Space Station medical officers, HMF instrumentation, and exercise equipment; 2) provide an integrated medical record and medical reference information management system; 3) manage inventory for logistical support of supplies and secure pharmaceuticals; 4) supply audio and electronic mail communications between the medical officer and ground based flight surgeons. ImagesFigure 1
"Doing" diversity. Holy Cross Health System facilities honor differences in different ways.
Burnside, G
1994-12-01
Holy Cross Health System (HCHS), a South Bend, IN-based organization that stretches from coast to coast, has instituted a diversity initiative to take advantage of demographic changes in its facilities' work forces and the communities they are serving. Launched by Holy Cross's corporate headquarters, the program is carried out by the member facilities, each of which had added its own ideas. HCHS's diversity program has three major components: Consciousness-raising among employees. Activities range from "transcultural rounds" for nursing students to fashion shows in which employees wear costumes from their places of national origin. Educating the larger community. HCHS facilities have been urged to increase awareness of diversity among physicians, patients, vendors, and local business and civic leaders. Strategic thinking. The leaders of HCHS facilities have been advised to integrate diversity into their strategic planning. Leaders are familiarizing themselves with the different cultural, ethnic, and religious groups in the community and preparing their facilities to take full advantage of those groups' contributions.
An Overview of INEL Fusion Safety R&D Facilities
NASA Astrophysics Data System (ADS)
McCarthy, K. A.; Smolik, G. R.; Anderl, R. A.; Carmack, W. J.; Longhurst, G. R.
1997-06-01
The Fusion Safety Program at the Idaho National Engineering Laboratory has the lead for fusion safety work in the United States. Over the years, we have developed several experimental facilities to provide data for fusion reactor safety analyses. We now have four major experimental facilities that provide data for use in safety assessments. The Steam-Reactivity Measurement System measures hydrogen generation rates and tritium mobilization rates in high-temperature (up to 1200°C) fusion relevant materials exposed to steam. The Volatilization of Activation Product Oxides Reactor Facility provides information on mobilization and transport and chemical reactivity of fusion relevant materials at high temperature (up to 1200°C) in an oxidizing environment (air or steam). The Fusion Aerosol Source Test Facility is a scaled-up version of VAPOR. The ion-implanta-tion/thermal-desorption system is dedicated to research into processes and phenomena associated with the interaction of hydrogen isotopes with fusion materials. In this paper we describe the capabilities of these facilities.
IUS/TUG orbital operations and mission support study. Volume 4: Project planning data
NASA Technical Reports Server (NTRS)
1975-01-01
Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.
Discovery Orbiter Major Modifications
2003-08-27
During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician moves a circuit reset on the cockpit console. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”
Surveys of facilities for the potential effects from the fallout of airborne graphite fibers
NASA Technical Reports Server (NTRS)
Butterfield, A. J.
1980-01-01
The impact of the entry of graphite fibers into workplaces in the United States is discussed. Areas where an electrical failure could cause major problems include process and production systems, hospitals, and police/fire emergency communication systems.
40 CFR 420.01 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... treatment system including schematic diagrams showing the major treatment system components and flow rates... request for consideration of alternative effluent limitations is to include: (i) A schematic diagram of... waters entering the treatment facility; discharge and recycle flow rates for each water source and each...
40 CFR 420.01 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... treatment system including schematic diagrams showing the major treatment system components and flow rates... request for consideration of alternative effluent limitations is to include: (i) A schematic diagram of... waters entering the treatment facility; discharge and recycle flow rates for each water source and each...
40 CFR 420.01 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-07-01
... treatment system including schematic diagrams showing the major treatment system components and flow rates... request for consideration of alternative effluent limitations is to include: (i) A schematic diagram of... waters entering the treatment facility; discharge and recycle flow rates for each water source and each...
40 CFR 420.01 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-07-01
... treatment system including schematic diagrams showing the major treatment system components and flow rates... request for consideration of alternative effluent limitations is to include: (i) A schematic diagram of... waters entering the treatment facility; discharge and recycle flow rates for each water source and each...
NASA Technical Reports Server (NTRS)
1976-01-01
Major strategies for exploring the solar system focus on the return of information and the return of matter. Both the planetary exploration facility, and an orbiting automated space station, and the sample return and exploration facility have similar requirements. The single most essential need to enable intensive study of the outer solar system is nuclear propulsion and power capability. New initiatives in 1978 related to the reactor, data and sample acquisition and return, navigation, and environmental protection are examined.
ERIC Educational Resources Information Center
Department of Commerce, Washington, DC.
This volume, the second of two, presents and analyzes the information technology acquisition plans of the Federal Government by agency and component. A brief description covers the outlays planned for major information technology acquisitions of general purpose data processing and telecommunications systems, facilities, and related services for 6…
Improving Management of Military Construction Planning and Design
1991-10-01
waterfront facilities and operations and its transportation systems, owns and operates JFK Airport . The Port Authority has an extremely capable and...restructured, and many projects are being deferred until the economic picture brightens. Airline user fees are the principal source of income for the JFK ... Airport . This "downsizing" has caused major schedule readjustment and sequencing of designs to ensure compatibility with existing facilities. In managing
A multi-objective model for sustainable recycling of municipal solid waste.
Mirdar Harijani, Ali; Mansour, Saeed; Karimi, Behrooz
2017-04-01
The efficient management of municipal solid waste is a major problem for large and populated cities. In many countries, the majority of municipal solid waste is landfilled or dumped owing to an inefficient waste management system. Therefore, an optimal and sustainable waste management strategy is needed. This study introduces a recycling and disposal network for sustainable utilisation of municipal solid waste. In order to optimise the network, we develop a multi-objective mixed integer linear programming model in which the economic, environmental and social dimensions of sustainability are concurrently balanced. The model is able to: select the best combination of waste treatment facilities; specify the type, location and capacity of waste treatment facilities; determine the allocation of waste to facilities; consider the transportation of waste and distribution of processed products; maximise the profit of the system; minimise the environmental footprint; maximise the social impacts of the system; and eventually generate an optimal and sustainable configuration for municipal solid waste management. The proposed methodology could be applied to any region around the world. Here, the city of Tehran, Iran, is presented as a real case study to show the applicability of the methodology.
Performance of a 12-coil superconducting bumpy torus magnet facility
NASA Technical Reports Server (NTRS)
Roth, J. R.; Holmes, A. D.; Keller, T. A.; Krawczonek, W. M.
1972-01-01
The bumpy torus facility consists of 12 superconducting coils, each 19 cm i.d. and capable of 3.0 teslas on their axes. The coils are equally spaced around a toroidal array with a major diameter of 1.52 m, and are mounted with the major axis of the torus vertical in a single vacuum tank 2.6 m in diameter. Final shakedown tests of the facility mapped out its magnetic, cryogenic, vacuum, mechanical, and electrical performance. The facility is now ready for use as a plasma physics research facility. A maximum magnetic field on the magnetic axis of 3.23 teslas was held for a period of more than sixty minutes without a coil normalcy. The design field was 3.00 teslas. The steady-state liquid helium boil-off rate was 87 liters per hour of liquid helium without the coils charged. The coil array was stable when subjected to an impulsive loading, even with the magnets fully charged. When the coils were charged to a maximum magnetic field of 3.35 teslas, the system was driven normal without damage.
48 CFR 923.7001 - Nuclear safety.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Nuclear safety. 923.7001 Section 923.7001 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS... Programs 923.7001 Nuclear safety. The DOE regulates the nuclear safety of its major facilities under its...
48 CFR 923.7001 - Nuclear safety.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Nuclear safety. 923.7001 Section 923.7001 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS... Programs 923.7001 Nuclear safety. The DOE regulates the nuclear safety of its major facilities under its...
48 CFR 923.7001 - Nuclear safety.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Nuclear safety. 923.7001 Section 923.7001 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS... Programs 923.7001 Nuclear safety. The DOE regulates the nuclear safety of its major facilities under its...
48 CFR 923.7001 - Nuclear safety.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Nuclear safety. 923.7001 Section 923.7001 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS... Programs 923.7001 Nuclear safety. The DOE regulates the nuclear safety of its major facilities under its...
Space technology test facilities at the NASA Ames Research Center
NASA Technical Reports Server (NTRS)
Gross, Anthony R.; Rodrigues, Annette T.
1990-01-01
The major space research and technology test facilities at the NASA Ames Research Center are divided into five categories: General Purpose, Life Support, Computer-Based Simulation, High Energy, and the Space Exploraton Test Facilities. The paper discusses selected facilities within each of the five categories and discusses some of the major programs in which these facilities have been involved. Special attention is given to the 20-G Man-Rated Centrifuge, the Human Research Facility, the Plant Crop Growth Facility, the Numerical Aerodynamic Simulation Facility, the Arc-Jet Complex and Hypersonic Test Facility, the Infrared Detector and Cryogenic Test Facility, and the Mars Wind Tunnel. Each facility is described along with its objectives, test parameter ranges, and major current programs and applications.
System integration of marketable subsystems
NASA Technical Reports Server (NTRS)
1978-01-01
These monthly reports, covering the period February 1978 through June 1978, describe the progress made in the major areas of the program. The areas covered are: systems integration of marketable subsystems; development, design, and building of site data acquisition subsystems; development and operation of the central data processing system; operation of the MSFC Solar Test Facility; and systems analysis.
NASA Astrophysics Data System (ADS)
Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo
2016-07-01
The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.
Energy Systems Training Programs and Certifications Survey White Paper
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cox, Daryl; Nimbalkar, Sachin U.; Wenning, Thomas J.
2017-02-01
Compressed air system, industrial refrigeration system, chilled water system, pump system, fan system, steam system, process heating system, and combined heat and power system are the major industrial energy systems. By helping enhance knowledge and skills of workforce, training and certification programs on these systems are essential to improve energy efficiency of manufacturing facilities. A literature survey of currently available training and certification programs on these systems was conducted.
Electronic Systems Test Laboratory (ESTL) User Test Planning Guide
NASA Technical Reports Server (NTRS)
Robinson, Neil
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Gething, Peter W; Noor, Abdisalan M; Goodman, Catherine A; Gikandi, Priscilla W; Hay, Simon I; Sharif, Shahnaaz K; Atkinson, Peter M; Snow, Robert W
2007-12-11
Most Ministries of Health across Africa invest substantial resources in some form of health management information system (HMIS) to coordinate the routine acquisition and compilation of monthly treatment and attendance records from health facilities nationwide. Despite the expense of these systems, poor data coverage means they are rarely, if ever, used to generate reliable evidence for decision makers. One critical weakness across Africa is the current lack of capacity to effectively monitor patterns of service use through time so that the impacts of changes in policy or service delivery can be evaluated. Here, we present a new approach that, for the first time, allows national changes in health service use during a time of major health policy change to be tracked reliably using imperfect data from a national HMIS. Monthly attendance records were obtained from the Kenyan HMIS for 1 271 government-run and 402 faith-based outpatient facilities nationwide between 1996 and 2004. A space-time geostatistical model was used to compensate for the large proportion of missing records caused by non-reporting health facilities, allowing robust estimation of monthly and annual use of services by outpatients during this period. We were able to reconstruct robust time series of mean levels of outpatient utilisation of health facilities at the national level and for all six major provinces in Kenya. These plots revealed reliably for the first time a period of steady nationwide decline in the use of health facilities in Kenya between 1996 and 2002, followed by a dramatic increase from 2003. This pattern was consistent across different causes of attendance and was observed independently in each province. The methodological approach presented can compensate for missing records in health information systems to provide robust estimates of national patterns of outpatient service use. This represents the first such use of HMIS data and contributes to the resurrection of these hugely expensive but underused systems as national monitoring tools. Applying this approach to Kenya has yielded output with immediate potential to enhance the capacity of decision makers in monitoring nationwide patterns of service use and assessing the impact of changes in health policy and service delivery.
2003-08-27
KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician (left) looks at the circuit breaker lights in the cabin. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”
NASA/FAA North Texas Research Station Overview
NASA Technical Reports Server (NTRS)
Borchers, Paul F.
2012-01-01
NTX Research Staion: NASA research assets embedded in an interesting operational air transport environment. Seven personnel (2 civil servants, 5 contractors). ARTCC, TRACON, Towers, 3 air carrier AOCs(American, Eagle and Southwest), and 2 major airports all within 12 miles. Supports NASA Airspace Systems Program with research products at all levels (fundamental to system level). NTX Laboratory: 5000 sq ft purpose-built, dedicated, air traffic management research facility. Established data links to ARTCC, TRACON, Towers, air carriers, airport and NASA facilities. Re-configurable computer labs, dedicated radio tower, state-of-the-art equipment.
National Transonic Facility status
NASA Technical Reports Server (NTRS)
Mckinney, L. W.; Bruce, W. E., Jr.; Gloss, B. B.
1989-01-01
The National Transonic Facility (NTF) was operational in a combined checkout and test mode for about 3 years. During this time there were many challenges associated with movement of mechanical components, operation of instrumentation systems, and drying of insulation in the cryogenic environment. Most of these challenges were met to date along with completion of a basic flow calibration and aerodynamic tests of a number of configurations. Some of the major challenges resulting from cryogenic environment are reviewed with regard to hardware systems and data quality. Reynolds number effects on several configurations are also discussed.
NASA Technical Reports Server (NTRS)
Sheppard, Albert P.; Wood, Joan M.
1976-01-01
Candidate experiments designed for the space shuttle transportation system and the long duration exposure facility are summarized. The data format covers: experiment title, Experimenter, technical abstract, benefits/justification, technical discussion of experiment approach and objectives, related work and experience, experiment facts space properties used, environmental constraints, shielding requirements, if any, physical description, and sketch of major elements. Information was also included on experiment hardware, research required to develop experiment, special requirements, cost estimate, safety considerations, and interactions with spacecraft and other experiments.
Improved E-ELT subsystem and component specifications, thanks to M1 test facility
NASA Astrophysics Data System (ADS)
Dimmler, M.; Marrero, J.; Leveque, S.; Barriga, Pablo; Sedghi, B.; Kornweibel, N.
2014-07-01
During the last 2 years ESO has operated the "M1 Test Facility", a test stand consisting of a representative section of the E-ELT primary mirror equipped with 4 complete prototype segment subunits including sensors, actuators and control system. The purpose of the test facility is twofold: it serves to study and get familiar with component and system aspects like calibration, alignment and handling procedures and suitable control strategies on real hardware long before the primary mirror (hereafter M1) components are commissioned. Secondly, and of major benefit to the project, it offered the possibility to evaluate component and subsystem performance and interface issues in a system context in such detail, that issues could be identified early enough to feed back into the subsystem and component specifications. This considerably reduces risk and cost of the production units and allows refocusing the project team on important issues for the follow-up of the production contracts. Experiences are presented in which areas the results of the M1 Test Facility particularly helped to improve subsystem specifications and areas, where additional tests were adopted independent of the main test facility. Presented are the key experiences of the M1 Test Facility which lead to improved specifications or identified the need for additional testing outside of the M1 Test Facility.
Characteristics and performance of a superconducting bumpy-torus magnet facility for plasma research
NASA Technical Reports Server (NTRS)
Roth, J. R.; Holmes, A. D.; Keller, T. A.; Krawczonek, W. M.
1973-01-01
The NASA Lewis bumpy-torus facility consists of 12 superconducting coils, each 19 cm i.d. and capable of 3.0 T on its axis. The coils are equally spaced around a toroidal array with a major diameter of 1.52 m; they are mounted with the major axis of the torus vertical in a single vacuum tank 2.6 m in diameter. Tests of the facility mapped out its magnetic, cryogenic, vacuum, mechanical, and electrical performance. The design value of the maximum magnetic field on the magnetic axis, 3.0 T, was reached and exceeded. A maximum magnetic field of 3.23 T was held for a period of 60 minutes. When the coils were charged to a maximum magnetic field of 3.35 T, the coil system went normal without apparent damage or degradation of performance.
Tritium systems test assembly stabilization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jasen, W. G.; Michelotti, R. A.; Anast, K. R.
The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium technology Research and Development (R&D) primarily for future fusion power reactors. The facility was conceived in mid 1970's, operations commenced in early 1980's, stabilization and deactivation began in 2000 and were completed in 2003. The facility will remain in a Surveillance and Maintenance (S&M) mode until the Department of Energy (DOE) funds demolition of the facility, tentatively in 2009. A safe and stable end state was achieved by the TSTA Facility Stabilization Project (TFSP) in anticipation of long term S&M. At the start of the stabilization project, withmore » an inventory of approximately 140 grams of tritium, the facility was designated a Hazard Category (HC) 2 Non-Reactor Nuclear facility as defined by US Department of Energy standard DOE-STD-1027-92 (1997). The TSTA facility comprises a laboratory area, supporting rooms, offices and associated laboratory space that included more than 20 major tritium handling systems. The project's focus was to reduce the tritium inventory by removing bulk tritium, tritiated water wastes, and tritium-contaminated high-inventory components. Any equipment that remained in the facility was stabilized in place. All of the gloveboxes and piping were rendered inoperative and vented to atmosphere. All equipment, and inventoried tritium contamination, remaining in the facility was left in a safe-and-stable state. The project used the End Points process as defined by the DOE Office of Environmental Management (web page http://www.em.doe.- gov/deact/epman.htmtlo) document and define the end state required for the stabilization of TSTA Facility. The End Points process added structure that was beneficial through virtually all phases of the project. At completion of the facility stabilization project the residual tritium inventory was approximately 3,000 curies, considerably less than the 1.6-gram threshold for a HC 3 facility. TSTA is now designated as a Radiological Facility. Innovative approaches were employed for characterization and removal of legacy wastes and high inventory components. Major accomplishments included: (1) Reduction of tritium inventory, elimination of chemical hazards, and identification and posting of remaining hazards. (2) Removal of legacy wastes. (3) Transferred equipment for reuse in other DOE projects, including some at other DOE facilities. (4) Transferred facility in a safe and stable condition to the S&M organization. The project successfully completed all project goals and the TSTA facility was transferred into S&M on August 1,2003. This project demonstrates the benefit of radiological inventory reduction and the removal of legacy wastes to achieve a safe and stable end state that protects workers and the environment pending eventual demolition of the facility.« less
7 CFR 4290.720 - Enterprises that may be ineligible for Financing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... wells, wind farms, or power facilities (including solar, geothermal, hydroelectric, or biomass power... the majority of the activities of the Enterprise. Examples include motion pictures. (e) Farm land... ineligible for Farm Credit System Assistance. If one or more Farm Credit System Institutions or their...
2010-10-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test Facility's 6,000-square-foot high bay. The prototype is used to demonstrate the safe disconnect and retraction of ground umbilical plates and associated hardware of a launch vehicle's upper stage and service module. The Environmental Control System consists of regulated air, which would be used to purge an inner tank and crew module. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, 600-ton test fixture, launch simulation towers and a cryogenic system. Photo credit: NASA/Jack Pfaller
2010-10-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test Facility's 6,000-square-foot high bay. The prototype is used to demonstrate the safe disconnect and retraction of ground umbilical plates and associated hardware of a launch vehicle's upper stage and service module. The Environmental Control System consists of regulated air, which would be used to purge an inner tank and crew module. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, 600-ton test fixture, launch simulation towers and a cryogenic system. Photo credit: NASA/Jack Pfaller
2010-10-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test Facility's 6,000-square-foot high bay. The prototype is used to demonstrate the safe disconnect and retraction of ground umbilical plates and associated hardware of a launch vehicle's upper stage and service module. The Environmental Control System consists of regulated air, which would be used to purge an inner tank and crew module. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, 600-ton test fixture, launch simulation towers and a cryogenic system. Photo credit: NASA/Jack Pfaller
2010-10-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test Facility's 6,000-square-foot high bay. The prototype is used to demonstrate the safe disconnect and retraction of ground umbilical plates and associated hardware of a launch vehicle's upper stage and service module. The Environmental Control System consists of regulated air, which would be used to purge an inner tank and crew module. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, 600-ton test fixture, launch simulation towers and a cryogenic system. Photo credit: NASA/Jack Pfaller
77 FR 11595 - Notice of Buy American Waiver under the American Recovery and Reinvestment Act of 2009
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-27
... seawater system balancing valves that will be used in the Alaska Region Research Vessel (ARRV). These valves regulate the proper flow of cooling water to the ship's major machinery. DATES: February 27, 2012... Foundation's Major Research Equipment and Facilities Construction (MREFC) account. The ARRV is one of NSF's...
Impact of distributed energy resources on the reliability of a critical telecommunications facility.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson, David; Zuffranieri, Jason V.; Atcitty, Christopher B.
2006-03-01
This report documents a probabilistic risk assessment of an existing power supply system at a large telecommunications office. The focus is on characterizing the increase in the reliability of power supply through the use of two alternative power configurations. Telecommunications has been identified by the Department of Homeland Security as a critical infrastructure to the United States. Failures in the power systems supporting major telecommunications service nodes are a main contributor to major telecommunications outages. A logical approach to improve the robustness of telecommunication facilities would be to increase the depth and breadth of technologies available to restore power inmore » the face of power outages. Distributed energy resources such as fuel cells and gas turbines could provide one more onsite electric power source to provide backup power, if batteries and diesel generators fail. The analysis is based on a hierarchical Bayesian approach and focuses on the failure probability associated with each of three possible facility configurations, along with assessment of the uncertainty or confidence level in the probability of failure. A risk-based characterization of final best configuration is presented.« less
2004-02-25
KENNEDY SPACE CENTER, FLA. - On a tour of the Orbiter Processing Facility, Center Director Jim Kennedy (left) looks at an external tank door corrosion work being done on Endeavour. At right, Tom Roberts, Airframe Engineering System specialist with United Space Alliance, is describing the work. At right is Kathy Laufenberg, Orbiter Airframe Engineering ground area manager,also with USA. Endeavour is in its Orbiter Major Modification period, which began in December 2003.
Clasper, J C; Midwinter, M J
2007-09-01
Deployment of Forward Surgery is a balance of risk and benefit. The resources will clearly be less than at a more major facility and so care may be compromised. Equally the tactical situation may be non-permissive and limb and life saving intervention required before the movement is possible. However, in order to provide satisfactory care at a forward location sufficient resources to deliver the full requirements of DCR & DCS must be met, which would limit manoeuvrability. This would include large volumes of blood and blood products, critical care and experienced personnel. The later will need to be some of the most senior medical staff as the decision to not operate, if intervention is unnecessary as the patient could wait or intervention would be futile, is one that requires experience. The deployment of these personnel would need to be balanced with the depletion of the experience from the major facility. Forward surgery may be appropriate in the build up phase, establishing a first surgical foot print to develop into a more capable facility (26) or wind down as the major facility is dismantled to be relocated at an alternative location. Ultimately the deployment of forward surgery hinges on the tactical assessment and the ability to evacuate casualties in a timely fashion to the best equipped and resourced facility possible. This decision must be informed by the limitations this may impose on the management of the majority casualties who do not require forward surgery. Forward surgery should only be deployed as part of an overall trauma system with continuous assessment of outcomes. The goal remains "the right patient, right place at the right time".
Facility Activation and Characterization for IPD Turbopump Testing at NASA Stennis Space Center
NASA Technical Reports Server (NTRS)
Sass, J. P.; Pace, J. S.; Raines, N. G.; Meredith, T. O.; Taylor, S. A.; Ryan, H. M.
2005-01-01
The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is, in part, supported by NASA. IPD is also supported through the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today's state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The IPD Program recently achieved two major milestones. The first was the successful completion of the IPD Oxidizer Turbopump (OTP) hot-fire test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in June 2003. A total of nine IPD Workhorse Preburner tests were completed, and subsequently 12 IPD OTP hot-fire tests were completed. The second major milestone was the successful completion of the IPD Fuel Turbopump (FTP) cold-flow test project at the NASA SSC E-1 test facility in November 2003. A total of six IPD FTP cold-flow tests were completed. The next phase of development involves IPD integrated engine system testing also at the NASA SSC E-1 test facility scheduled to begin in early 2005. Following and overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and testing of the IPD oxidizer and fuel turbopumps. In addition, some of the facility challenges encountered and the lessons learned during the test projects shall be detailed.
NASA Astrophysics Data System (ADS)
1981-09-01
The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.
NASA Technical Reports Server (NTRS)
1981-01-01
The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.
NASA Technical Reports Server (NTRS)
1980-01-01
Major facts are given for NASA'S planned FY-1981 through FY-1985 programs in aeronautics, space science, space and terrestrial applications, energy technology, space technology, space transportation systems, space tracking and data systems, and construction of facilities. Competition and cooperation, reimbursable launchings, schedules and milestones, supporting research and technology, mission coverage, and required funding are considered. Tables and graphs summarize new initiatives, significant events, estimates of space shuttle flights, and major missions in astrophysics, planetary exploration, life sciences, environmental and resources observation, and solar terrestrial investigations. The growth in tracking and data systems capabilities is also depicted.
NASA Astrophysics Data System (ADS)
Makisha, Nikolay; Gogina, Elena
2017-11-01
Protection of water bodies has a strict dependence on reliable operation of engineering systems and facilities for water supply and sewage. The majority of these plants and stations has been constructed in 1970-1980's in accordance with rules and regulations of that time. So now most of them require reconstruction due to serious physical or/and technological wear. The current condition of water supply and sewage systems and facilities frequently means a hidden source of serious danger for normal life support and ecological safety of cities and towns. The article reveals an obtained experience and modern approaches for reconstruction of waste water and sludge treatment plants that proved their efficiency even if applied in limited conditions such as area limits, investments limits. The main directions of reconstruction: overhaul repair and partial modernization of existing facilities on the basis of initial project; - restoration and modernization of existing systems on the basis on the current documents and their current condition; upgrade of waste water treatment plants (WWTPs) performance on the basis of modern technologies and methods; reconstruction of sewage systems and facilities and treatment quality improvement.
CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ted Berglund; Jeffrey T. Ranney; Carol L. Babb
2001-10-01
The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. During this first quarter of 2001, shredding of the feed material and final feed conditioning were completed. Pilot facility hydrolysis production was completed tomore » produce lignin for co-fire testing and the lignin fuel was washed and dewatered. Both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation and co-firing. EERC has received coal typical of the fuel to the TVA-Colbert boilers. This material will be used at EERC as baseline material and for mixing with the bio-fuel for combustion testing. EERC combustion testing of the bio-based fuels is scheduled to begin in October of 2001. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system was completed. The cost estimate and the output and heat rate impacts will be used to determine a preliminary price for the exported steam.« less
ERIC Educational Resources Information Center
Wheeler, Arthur E.; Kunz, Walter S., Jr.
Although poor air quality in a school can have multiple causes, the heating, ventilating, and air-conditioning (HVAC) system plays a major role. Suggestions that architects, facilities managers, school board members, and administrators can use in selecting HVAC systems are discussed. Focus is on the performance criteria for classroom systems, and…
Future aerospace ground test facility requirements for the Arnold Engineering Development Center
NASA Technical Reports Server (NTRS)
Kirchner, Mark E.; Baron, Judson R.; Bogdonoff, Seymour M.; Carter, Donald I.; Couch, Lana M.; Fanning, Arthur E.; Heiser, William H.; Koff, Bernard L.; Melnik, Robert E.; Mercer, Stephen C.
1992-01-01
Arnold Engineering Development Center (AEDC) was conceived at the close of World War II, when major new developments in flight technology were presaged by new aerodynamic and propulsion concepts. During the past 40 years, AEDC has played a significant part in the development of many aerospace systems. The original plans were extended through the years by some additional facilities, particularly in the area of propulsion testing. AEDC now has undertaken development of a master plan in an attempt to project requirements and to plan for ground test and computational facilities over the coming 20 to 30 years. This report was prepared in response to an AEDC request that the National Research Council (NRC) assemble a committee to prepare guidance for planning and modernizing AEDC facilities for the development and testing of future classes of aerospace systems as envisaged by the U.S. Air Force.
The International Microgravity Laboratory, a Spacelab for materials and life sciences
NASA Technical Reports Server (NTRS)
Snyder, Robert S.
1992-01-01
The material science experiments performed on the International Microgravity Laboratory (IML-1), which is used to perform investigations which require the low gravity environment of space, are discussed. These experiments, the principal investigator, and associated organization are listed. Whether the experiment was a new development or was carried on an earlier space mission, such as the third Spacelab (SL-3) or the Shuttle Middeck, is also noted. The two major disciplines of materials science represented on IML-1 were the growth of crystals from the melt, solution, or vapor and the study of fluids (liquids and gases) in a reduced gravity environment. The various facilities on board IML-1 and their related experiments are described. The facilities include the Fluids Experiment System (FES) Vapor Crystal Growth System (VCGS) Organic Crystal Growth Facility (OCGF), Cryostat (CRY), and the Critical Point Facility (CPF).
2011-02-15
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann
2011-02-15
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann
2011-02-15
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, training takes place atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann
2011-02-15
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann
2011-02-15
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training on a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann
76 FR 35920 - Notice of Buy American Waiver Under the American Recovery and Reinvestment Act of 2009
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-20
... antifouling system that will be used in the Alaska Region Research Vessel (ARRV). An ultrasonic antifouling system prevents the harmful growth of marine organisms in the ship's sea water inlets and piping systems... by the Foundation's Major Research Equipment and Facilities Construction (MREFC) account. The ARRV is...
10 CFR Appendix D to Subpart D of... - Classes of Actions That Normally Require EISs
Code of Federal Regulations, 2011 CFR
2011-01-01
.../operation/decommissioning of reactors D5. Main transmission system additions D6. Integrating transmission... waste) D1Strategic Systems, as defined in DOE Order 430.1, “Life-Cycle Asset Management,” and designated... facilities (that is, transmission system additions for integrating major new sources of generation into a...
USDA-ARS?s Scientific Manuscript database
There is interest in culturing Atlantic salmon Salmo salar to market-size in land-based, closed containment systems that use recirculation aquaculture systems (RAS), as this technology often enables facilities to locate near major markets, obtain permits, exclude obligate pathogens, and/or reduce en...
Future Automated Rough Mills Hinge on Vision Systems
Philip A. Araman
1996-01-01
The backbone behind major changes to present and future rough mills in dimension, furniture, cabinet or millwork facilities will be computer vision systems. Because of the wide variety of products and the quality of parts produced, the scanning systems and rough mills will vary greatly. The scanners will vary in type. For many complicated applications, multiple scanner...
Large-Scale Cryogenic Testing of Launch Vehicle Ground Systems at the Kennedy Space Center
NASA Technical Reports Server (NTRS)
Ernst, E. W.; Sass, J. P.; Lobemeyer, D. A.; Sojourner, S. J.; Hatfield, W. H.; Rewinkel, D. A.
2007-01-01
The development of a new launch vehicle to support NASA's future exploration plans requires significant redesign and upgrade of Kennedy Space Center's (KSC) launch pad and ground support equipment systems. In many cases, specialized test equipment and systems will be required to certify the function of the new system designs under simulated operational conditions, including propellant loading. This paper provides an overview of the cryogenic test infrastructure that is in place at KSC to conduct development and qualification testing that ranges from the component level to the integrated-system level. An overview of the major cryogenic test facilities will be provided, along with a detailed explanation of the technology focus area for each facility
LSST telescope and site status
NASA Astrophysics Data System (ADS)
Gressler, William J.
2016-07-01
The Large Synoptic Survey Telescope (LSST) Project1 received its construction authorization from the National Science Foundation in August 2014. The Telescope and Site (T and S) group has made considerable progress towards completion in subsystems required to support the scope of the LSST science mission. The LSST goal is to conduct a wide, fast, deep survey via a 3-mirror wide field of view optical design, a 3.2-Gpixel camera, and an automated data processing system. The summit facility is currently under construction on Cerro Pachón in Chile, with major vendor subsystem deliveries and integration planned over the next several years. This paper summarizes the status of the activities of the T and S group, tasked with design, analysis, and construction of the summit and base facilities and infrastructure necessary to control the survey, capture the light, and calibrate the data. All major telescope work package procurements have been awarded to vendors and are in varying stages of design and fabrication maturity and completion. The unique M1M3 primary/tertiary mirror polishing effort is completed and the mirror now resides in storage waiting future testing. Significant progress has been achieved on all the major telescope subsystems including the summit facility, telescope mount assembly, dome, hexapod and rotator systems, coating plant, base facility, and the calibration telescope. In parallel, in-house efforts including the software needed to control the observatory such as the scheduler and the active optics control, have also seen substantial advancement. The progress and status of these subsystems and future LSST plans during this construction phase are presented.
Patient handling system for carbon ion beam scanning therapy
Shirai, Toshiyuki; Takei, Yuka; Furukawa, Takuji; Inaniwa, Taku; Matsuzaki, Yuka; Kumagai, Motoki; Murakami, Takeshi; Noda, Koji
2012-01-01
Our institution established a new treatment facility for carbon ion beam scanning therapy in 2010. The major advantages of scanning beam treatment compared to the passive beam treatment are the following: high dose conformation with less excessive dose to the normal tissues, no bolus compensator and patient collimator/ multi‐leaf collimator, better dose efficiency by reducing the number of scatters. The new facility was designed to solve several problems encountered in the existing facility, at which several thousand patients were treated over more than 15 years. Here, we introduce the patient handling system in the new treatment facility. The new facility incorporates three main systems, a scanning irradiation system (S‐IR), treatment planning system (TPS), and patient handling system (PTH). The PTH covers a wide range of functions including imaging, geometrical/position accuracy including motion management (immobilization, robotic arm treatment bed), layout of the treatment room, treatment workflow, software, and others. The first clinical trials without respiratory gating have been successfully started. The PTH allows a reduction in patient stay in the treatment room to as few as 7 min. The PTH plays an important role in carbon ion beam scanning therapy at the new institution, particularly in the management of patient handling, application of image‐guided therapy, and improvement of treatment workflow, and thereby allows substantially better treatment at minimum cost. PACS numbers: 87.56.‐v; 87.57.‐s; 87.55.‐x PMID:23149784
Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide
NASA Technical Reports Server (NTRS)
Stokes, LeBarian
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
NASA Technical Reports Server (NTRS)
Jackola, Arthur S.; Hartjen, Gary L.
1992-01-01
The plans for a new test facility, including new environmental test systems, which are presently under construction, and the major environmental Test Support Equipment (TSE) used therein are addressed. This all-new Rocketdyne facility will perform space simulation environmental tests on Power Management and Distribution (PMAD) hardware to Space Station Freedom (SSF) at the Engineering Model, Qualification Model, and Flight Model levels of fidelity. Testing will include Random Vibration in three axes - Thermal Vacuum, Thermal Cycling and Thermal Burn-in - as well as numerous electrical functional tests. The facility is designed to support a relatively high throughput of hardware under test, while maintaining the high standards required for a man-rated space program.
Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide
NASA Technical Reports Server (NTRS)
Salinas, Michael
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Development of an integrated set of research facilities for the support of research flight test
NASA Technical Reports Server (NTRS)
Moore, Archie L.; Harney, Constance D.
1988-01-01
The Ames-Dryden Flight Research Facility (DFRF) serves as the site for high-risk flight research on many one-of-a-kind test vehicles like the X-29A advanced technology demonstrator, F-16 advanced fighter technology integration (AFTI), AFTI F-111 mission adaptive wing, and F-18 high-alpha research vehicle (HARV). Ames-Dryden is on a section of the historic Muroc Range. The facility is oriented toward the testing of high-performance aircraft, as shown by its part in the development of the X-series aircraft. Given the cost of research flight tests and the complexity of today's systems-driven aircraft, an integrated set of ground support experimental facilities is a necessity. In support of the research flight test of highly advanced test beds, the DFRF is developing a network of facilities to expedite the acquisition and distribution of flight research data to the researcher. The network consists of an array of experimental ground-based facilities and systems as nodes and the necessary telecommunications paths to pass research data and information between these facilities. This paper presents the status of the current network, an overview of current developments, and a prospectus on future major enhancements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dubois, P.F.
1989-05-16
This paper discusses the basis system. Basis is a program development system for scientific programs. It has been developed over the last five years at Lawrence Livermore National Laboratory (LLNL), where it is now used in about twenty major programming efforts. The Basis System includes two major components, a program development system and a run-time package. The run-time package provides the Basis Language interpreter, through which the user does input, output, plotting, and control of the program's subroutines and functions. Variables in the scientific packages are known to this interpreter, so that the user may arbitrarily print, plot, and calculatemore » with, any major program variables. Also provided are facilities for dynamic memory management, terminal logs, error recovery, text-file i/o, and the attachment of non-Basis-developed packages.« less
Cosmic Dust Collection Facility: Scientific objectives and programmatic relations
NASA Technical Reports Server (NTRS)
Hoerz, Fred (Editor); Brownlee, D. E.; Bunch, T. E.; Grounds, D.; Grun, E.; Rummel, Y.; Quaide, W. L.; Walker, R. M.
1990-01-01
The science objectives are summarized for the Cosmic Dust Collection Facility (CDCF) on Space Station Freedom and these objectives are related to ongoing science programs and mission planning within NASA. The purpose is to illustrate the potential of the CDCF project within the broad context of early solar system sciences that emphasize the study of primitive objects in state-of-the-art analytical and experimental laboratories on Earth. Current knowledge about the sources of cosmic dust and their associated orbital dynamics is examined, and the results are reviewed of modern microanalytical investigations of extraterrestrial dust particles collected on Earth. Major areas of scientific inquiry and uncertainty are identified and it is shown how CDCF will contribute to their solution. General facility and instrument concepts that need to be pursued are introduced, and the major development tasks that are needed to attain the scientific objectives of the CDCF project are identified.
Medical status of adolescents at time of admission to a juvenile detention center.
Feinstein, R A; Lampkin, A; Lorish, C D; Klerman, L V; Maisiak, R; Oh, M K
1998-03-01
To examine the medical status and history of health care utilization of adolescents at the time of their admission to a juvenile detention facility. Data were collected over an 18-month period on all detainees admitted for the first time to a juvenile detention facility in a major southeastern city in the United States. Information was gathered through a private, confidential interview completed by a medical social worker and a physical examination by a physician. Information was obtained regarding past medical history, complaints at the time of admission, health care utilization, and physical examination. Approximately 10% of teenagers admitted to a detention facility have a significant medical problem (excluding drug/alcohol abuse, or uncomplicated sexually transmitted diseases) that requires medical follow-up. The majority of these conditions were known to the adolescent at the time of admission. Only a third of adolescents admitted to the detention facility reported a regular source of medical care, and only about 20% reported having a private physician. A majority of all the detainees had already fallen behind in or dropped out of school. More than half of the families of the adolescents with a medical problem appeared to be unable or unwilling to assist in ensuring proper medical follow-up. A significant percentage of adolescents entering a detention facility have a medical problem requiring health care services. Detention facilities offer an opportunity to deliver and coordinate medical care to high-risk adolescents. Programs linking public and private health care providers with the correctional care system may provide juveniles with an acceptable option for obtaining needed health care services.
Creation of a small high-throughput screening facility.
Flak, Tod
2009-01-01
The creation of a high-throughput screening facility within an organization is a difficult task, requiring a substantial investment of time, money, and organizational effort. Major issues to consider include the selection of equipment, the establishment of data analysis methodologies, and the formation of a group having the necessary competencies. If done properly, it is possible to build a screening system in incremental steps, adding new pieces of equipment and data analysis modules as the need grows. Based upon our experience with the creation of a small screening service, we present some guidelines to consider in planning a screening facility.
NASA Astrophysics Data System (ADS)
Mayfield, E. N.; Robinson, A. L.; Cohon, J. L.
2017-12-01
This work assesses trade-offs between system-wide and superemitter policy options for reducing methane emissions from compressor stations in the U.S. transmission and storage system. Leveraging recently collected national emissions and activity data sets, we developed a new process-based emissions model implemented in a Monte Carlo simulation framework to estimate emissions for each component and facility in the system. We find that approximately 83% of emissions, given the existing suite of technologies, have the potential to be abated, with only a few emission categories comprising a majority of emissions. We then formulate optimization models to determine optimal abatement strategies. Most emissions across the system (approximately 80%) are efficient to abate, resulting in net benefits ranging from 160M to 1.2B annually across the system. The private cost burden is minimal under standard and tax instruments, and if firms market the abated natural gas, private net benefits may be generated. Superemitter policies, namely, those that target the highest emitting facilities, may reduce the private cost burden and achieve high emission reductions, especially if emissions across facilities are highly skewed. However, detection across all facilities is necessary regardless of the policy option and there are nontrivial net benefits resulting from abatement of relatively low-emitting sources.
Mayfield, Erin N; Robinson, Allen L; Cohon, Jared L
2017-05-02
This work assesses trade-offs between system-wide and superemitter policy options for reducing methane emissions from compressor stations in the U.S. transmission and storage system. Leveraging recently collected national emissions and activity data sets, we developed a new process-based emissions model implemented in a Monte Carlo simulation framework to estimate emissions for each component and facility in the system. We find that approximately 83% of emissions, given the existing suite of technologies, have the potential to be abated, with only a few emission categories comprising a majority of emissions. We then formulate optimization models to determine optimal abatement strategies. Most emissions across the system (approximately 80%) are efficient to abate, resulting in net benefits ranging from $160M to $1.2B annually across the system. The private cost burden is minimal under standard and tax instruments, and if firms market the abated natural gas, private net benefits may be generated. Superemitter policies, namely, those that target the highest emitting facilities, may reduce the private cost burden and achieve high emission reductions, especially if emissions across facilities are highly skewed. However, detection across all facilities is necessary regardless of the policy option and there are nontrivial net benefits resulting from abatement of relatively low-emitting sources.
Orbiting Quarantine Facility. The Antaeus report, summary
NASA Technical Reports Server (NTRS)
1981-01-01
Requirements for handling extraterrestrial samples in an orbiting quarantine facility are examined. The major concepts and findings of the study are outlined. One approach that could be taken for receiving, containing, and analyzing samples returned from the surface of Mars in a mission analogous to the lunar return missions of the late 1960s and early 1970s is described. It constructs a general mission scenario and presents an overall systems design, including an approach to cost assessment. Particular attention is paid to the design of system hardware components and to the elaboration of an experimental protocol.
A Space Station tethered orbital refueling facility
NASA Technical Reports Server (NTRS)
Fester, D. A.; Rudolph, L. K.; Kiefel, E. R.
1985-01-01
A planned function of the Space Station is to refurbish and refuel an advanced space-based LO2/LH2 orbit transfer vehicle. An alternative to propellant storage at the station is to use a remote facility tied to the station with a long tether. Preliminary design of such a facility is described with emphasis on fluid transfer and storage requirements. Using tether lengths of at least 300 ft, gravity gradient forces will dominate surface tension in such a system. Although gravity driven transfer is difficult because of line pressure drops, fluid settling over the tank outlet greatly alleviates acquisition concerns and will facilitate vented tank fills. The major concern with a tethered orbital refueling facility is its considerable operational complexity including transport of the OTV to and from the facility.
Khan, M Mahmud; Hotchkiss, David R; Dmytraczenko, Tania; Zunaid Ahsan, Karar
2013-01-01
This paper illustrates the importance of collecting facility-based data through regular surveys to supplement the administrative data, especially for developing countries of the world. In Bangladesh, measures based on facility survey indicate that only 70% of very basic medical instruments and 35% of essential drugs were available in health facilities. Less than 2% of officially designated obstetric care facilities actually had required drugs, injections and personnel on-site. Majority of (80%) referral hospitals at the district level were not ready to provide comprehensive emergency obstetric care. Even though the Management Information System reports availability of diagnostic machines in all district-level and sub-district-level facilities, it fails to indicate that 50% of these machines are not functional. In terms of human resources, both physicians and nurses are in short supply at all levels of the healthcare system. The physician-nurse ratio also remains lower than the desirable level of 3.0. Overall job satisfaction index was less than 50 for physicians and 66 for nurses. Patient satisfaction score, however, was high (86) despite the fact that process indicators of service quality were poor. Facility surveys can help strengthen not only the management decision-making process but also the quality of administrative data. Copyright © 2012 John Wiley & Sons, Ltd.
Exhaust pressure and density of various pulsed MPD-Arc thruster systems
NASA Technical Reports Server (NTRS)
Michels, C. J.
1973-01-01
Exhaust flow in a new 155-cm-i.d. vacuum facility is compared with earlier measurements in a small (15.2-cm-i.d.) duct. Reductions in post-transient impact pressure are about 5:1 in the larger facility. Corresponding reduced electron number densities (about 2 x 10 to the 13th power per cu cm) are noted. A new 125-microsec pulse-forming network power source produced no major differences in impact pressure compared to the crowbarred condenser bank used earlier. Comparing a puff gas feed of the arc chamber with a new 10-msec steady gas feed also shows no major difference in impact pressure for 125-microsec powering.
A Review of the Capability Options Development and Analysis System and the Role of Risk Management
2006-08-01
Development Plan OF Objective Force SME Subject Matter Expertise S&T Science & Technology SWOT strengths, weaknesses, opportunities and threats...aircraft, or armoured vehicles. Rather it is the combination of people, organisation, equipment, systems and facilities to achieve a desired...Defence policy or Joint Service implications. They include ships, tanks, missile systems, armoured personnel carriers, major electronic systems, and
NASA Astrophysics Data System (ADS)
Moon, Y. I.; Kim, M. S.; Choi, J. H.; Yuk, G. M.
2017-12-01
eavy rainfall has become a recent major cause of urban area flooding due to the climate change and urbanization. To prevent property damage along with casualties, a system which can alert and forecast urban flooding must be developed. Optimal performance of reducing flood damage can be expected of urban drainage facilities when operated in smaller rainfall events over extreme ones. Thus, the purpose of this study is to execute: A) flood forecasting system using runoff analysis based on short term rainfall; and B) flood warning system which operates based on the data from pump stations and rainwater storage in urban basins. In result of the analysis, it is shown that urban drainage facilities using short term rainfall forecasting data by radar will be more effective to reduce urban flood damage than using only the inflow data of the facility. Keywords: Heavy Rainfall, Urban Flood, Short-term Rainfall Forecasting, Optimal operating of urban drainage facilities. AcknowledgmentsThis research was supported by a grant (17AWMP-B066744-05) from Advanced Water Management Research Program (AWMP) funded by Ministry of Land, Infrastructure and Transport of Korean government.
Major Decision Points in Library Automation
ERIC Educational Resources Information Center
Veaner, Allen B.
1970-01-01
Based on a longer, more detailed paper prepared for the 1970 Midwinter Meeting of the Association of Research Libraries, this article discussion auutomation in the context of the management, facilities and system requirements for large research libraries. (Author/NH)
2004-02-25
KENNEDY SPACE CENTER, FLA. - On a tour of the Orbiter Processing Facility, Center Director Jim Kennedy and Deputy Director Woodrow Whitlow Jr. (center, left and right) talk with Kathy Laufenberg, Orbiter Airframe Engineering ground rea manager, and Tom Roberts, Airframe Engineering System specialist, both with United Space Alliance. At far right is Bruce Buckingham, assistant to Dr. Whitlow. They are standing in front of the aft base heatshield of Endeavour, which is in its Orbiter Major Modification period that began in December 2003.
2004-02-25
KENNEDY SPACE CENTER, FLA. - On a tour of the Orbiter Processing Facility, Center Director Jim Kennedy and Deputy Director Woodrow Whitlow Jr. (center, left and right) talk with Kathy Laufenberg, Orbiter Airframe Engineering ground area manager, and Tom Roberts, Airframe Enginering System specialist, both with United Space Alliance. At far right is Bruce Buckingham, assistant to Dr. Whitlow. They are standing in front of the aft base heatshield of Endeavour, which is in its Orbiter Major Modification period that began in December 2003.
2004-02-25
KENNEDY SPACE CENTER, FLA. - On a tour of the Orbiter Processing Facility, Center Director Jim Kennedy (left) listens to Kathy Laufenberg, Orbiter Airframe Engineering ground area manager, with United Space Alliance, about corrosion work being done on the external tank door of orbiter Endeavour. On either side of Laufenberg are Tom Roberts, Airframe Engineering System specialist, also with USA, and Joy Huff, with KSC Space Shuttle Processing. Endeavour is in its Orbiter Major Modification period, which began in December 2003.
NASA Technical Reports Server (NTRS)
1995-01-01
This 1994 report of the Space Studies Board of the National Research Council summarizes the charter and organization of the board, activities and membership, major and short reports, and congressional testimony. A cumulative bibliography of the Space Studies (formerly Space Science) Board and its committees is provided. An appendix contains reports of the panel to review Earth Observing System Data and Information System (EOSDIS) plans. Major reports cover scientific opportunities in the human exploration of space, the dichotomy between funding and effectiveness in space physics, an integrated strategy for the planetary sciences for the years 1995-2010, and Office of Naval Research (ONR) research opportunities in upper atmospheric sciences. Short reports cover utilization of the space station, life and microgravity sciences and the space station program, Space Infrared Telescope Facility and the Stratospheric Observatory for Infrared Astronomy, and the Advanced X-ray Astrophysics Facility and Cassini Saturn Probe.
Methodological aspects of fuel performance system analysis at raw hydrocarbon processing plants
NASA Astrophysics Data System (ADS)
Kulbjakina, A. V.; Dolotovskij, I. V.
2018-01-01
The article discusses the methodological aspects of fuel performance system analysis at raw hydrocarbon (RH) processing plants. Modern RH processing facilities are the major consumers of energy resources (ER) for their own needs. To reduce ER, including fuel consumption, and to develop rational fuel system structure are complex and relevant scientific tasks that can only be done using system analysis and complex system synthesis. In accordance with the principles of system analysis, the hierarchical structure of the fuel system, the block scheme for the synthesis of the most efficient alternative of the fuel system using mathematical models and the set of performance criteria have been developed on the main stages of the study. The results from the introduction of specific engineering solutions to develop their own energy supply sources for RH processing facilities have been provided.
2009-11-19
CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility is unveiled at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2009-11-19
CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility is ready for operation at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2009-11-19
CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility opens at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
Schneider, Jeffrey C; Tan, Wei-Han; Goldstein, Richard; Mix, Jacqueline M; Niewczyk, Paulette; Divita, Margaret A; Ryan, Colleen M; Gerrard, Paul B; Kowalske, Karen; Zafonte, Ross
2013-01-01
A preliminary investigation of the burn rehabilitation population found a large variability of zero onset day frequency between facilities. Onset days is defined as the time from injury to inpatient rehabilitation admission; this variable has not been investigated in burn patients previously. This study explored if this finding was a facility-based phenomena or characteristic of burn inpatient rehabilitation patients. This study was a secondary analysis of Uniform Data System for Medical Rehabilitation (UDSmr) data from 2002 to 2007 examining inpatient rehabilitation characteristics among patients with burn injuries. Exclusion criteria were age less than 18 years and discharge against medical advice. Comparisons of demographic, medical and functional data were made between facilities with a high frequency of zero onset days versus facilities with a low frequency of zero onset days. A total of 4738 patients from 455 inpatient rehabilitation facilities were included. Twenty-three percent of the population exhibited zero onset days (n = 1103). Sixteen facilities contained zero onset patients; two facilities accounted for 97% of the zero onset subgroup. Facilities with a high frequency of zero onset day patients demonstrated significant differences in demographic, medical, and functional variables compared to the remainder of the study population. There were significantly more zero onset day admissions among burn patients (23%) than other diagnostic groups (0.5- 3.6%) in the Uniform Data System for Medical Rehabilitation database, but the majority (97%) came from two inpatient rehabilitation facilities. It is unexpected for patients with significant burn injury to be admitted to a rehabilitation facility on the day of injury. Future studies investigating burn rehabilitation outcomes using the Uniform Data System for Medical Rehabilitation database should exclude facilities with a high percentage of zero onset days, which are not representative of the burn inpatient rehabilitation population.
47 CFR 73.7001 - Services subject to evaluation by point system.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., as described in 47 U.S.C. 397(6)(B). [65 FR 36380, June 8, 2000, as amended at 68 FR 26229, May 15... 47 Telecommunication 4 2014-10-01 2014-10-01 false Services subject to evaluation by point system... major changes to existing facilities, on reserved channels. (b) A point system will be used to evaluate...
47 CFR 73.7001 - Services subject to evaluation by point system.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., as described in 47 U.S.C. 397(6)(B). [65 FR 36380, June 8, 2000, as amended at 68 FR 26229, May 15... 47 Telecommunication 4 2012-10-01 2012-10-01 false Services subject to evaluation by point system... major changes to existing facilities, on reserved channels. (b) A point system will be used to evaluate...
47 CFR 73.7001 - Services subject to evaluation by point system.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., as described in 47 U.S.C. 397(6)(B). [65 FR 36380, June 8, 2000, as amended at 68 FR 26229, May 15... 47 Telecommunication 4 2013-10-01 2013-10-01 false Services subject to evaluation by point system... major changes to existing facilities, on reserved channels. (b) A point system will be used to evaluate...
47 CFR 73.7001 - Services subject to evaluation by point system.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., as described in 47 U.S.C. 397(6)(B). [65 FR 36380, June 8, 2000, as amended at 68 FR 26229, May 15... 47 Telecommunication 4 2011-10-01 2011-10-01 false Services subject to evaluation by point system... major changes to existing facilities, on reserved channels. (b) A point system will be used to evaluate...
Naval facility energy conversion plants as resource recovery system components
NASA Astrophysics Data System (ADS)
Capps, A. G.
1980-01-01
This interim report addresses concepts for recovering energy from solid waste by using Naval facilities steam plants as principle building blocks of candidate solid waste/resource recovery systems at Navy installations. The major conclusions of this portion of the project are: although it is technically feasible to adapt Navy energy conversion systems to fire Waste Derived Fuels (WDF) in one or more of its forms, the optimal form selected should be a site-specific total system; near- to intermediate-term programs should probably continue to give first consideration to waterwall incinerators and to the cofiring of solid WDF in coal-capable plants; package incinerators and conversions of oil burning plants to fire a fluff form of solid waste fuel may be the options with the greatest potential for the intermediate term because waterwalls would be uneconomical in many small plants and because the majority of medium-sized oil-burning plants will not be converted to burn coal; and pyrolytic processes to produce gaseous and liquid fuels have not been sufficiently developed as yet to be specified for commerical operation.
MouseNet database: digital management of a large-scale mutagenesis project.
Pargent, W; Heffner, S; Schäble, K F; Soewarto, D; Fuchs, H; Hrabé de Angelis, M
2000-07-01
The Munich ENU Mouse Mutagenesis Screen is a large-scale mutant production, phenotyping, and mapping project. It encompasses two animal breeding facilities and a number of screening groups located in the general area of Munich. A central database is required to manage and process the immense amount of data generated by the mutagenesis project. This database, which we named MouseNet(c), runs on a Sybase platform and will finally store and process all data from the entire project. In addition, the system comprises a portfolio of functions needed to support the workflow management of the core facility and the screening groups. MouseNet(c) will make all of the data available to the participating screening groups, and later to the international scientific community. MouseNet(c) will consist of three major software components:* Animal Management System (AMS)* Sample Tracking System (STS)* Result Documentation System (RDS)MouseNet(c) provides the following major advantages:* being accessible from different client platforms via the Internet* being a full-featured multi-user system (including access restriction and data locking mechanisms)* relying on a professional RDBMS (relational database management system) which runs on a UNIX server platform* supplying workflow functions and a variety of plausibility checks.
Numerical aerodynamic simulation facility feasibility study, executive summary
NASA Technical Reports Server (NTRS)
1979-01-01
There were three major issues examined in the feasibility study. First, the ability of the proposed system architecture to support the anticipated workload was evaluated. Second, the throughput of the computational engine (the flow model processor) was studied using real application programs. Third, the availability, reliability, and maintainability of the system were modeled. The evaluations were based on the baseline systems. The results show that the implementation of the Numerical Aerodynamic Simulation Facility, in the form considered, would indeed be a feasible project with an acceptable level of risk. The technology required (both hardware and software) either already exists or, in the case of a few parts, is expected to be announced this year.
NASA Technical Reports Server (NTRS)
Prince, R.; Knott, W.; Buchanan, Paul
1987-01-01
Design criteria for the Biomass Production Chamber (BPC), preliminary operating procedures, and requirements for the future development of the Controlled Ecological Life Support System (CELSS) are discussed. CELSS, which uses a bioregenerative system, includes the following three major units: (1) a biomass production component to grow plants under controlled conditions; (2) food processing components to derive maximum edible content from all plant parts; and (3) waste management components to recover and recycle all solids, liquids, and gases necessary to support life. The current status of the CELSS breadboard facility is reviewed; a block diagram of a simplified version of CELSS and schematic diagrams of the BPS are included.
Life Cycle Cost Analysis of Ready Mix Concrete Plant
NASA Astrophysics Data System (ADS)
Topkar, V. M.; Duggar, A. R.; Kumar, A.; Bonde, P. P.; Girwalkar, R. S.; Gade, S. B.
2013-11-01
India, being a developing nation is experiencing major growth in its infrastructural sector. Concrete is the major component in construction. The requirement of good quality of concrete in large quantities can be fulfilled by ready mix concrete batching and mixing plants. The paper presents a technique of applying the value engineering tool life cycle cost analysis to a ready mix concrete plant. This will help an investor or an organization to take investment decisions regarding a ready mix concrete facility. No economic alternatives are compared in this study. A cost breakdown structure is prepared for the ready mix concrete plant. A market survey has been conducted to collect realistic costs for the ready mix concrete facility. The study establishes the cash flow for the ready mix concrete facility helpful in investment and capital generation related decisions. Transit mixers form an important component of the facility and are included in the calculations. A fleet size for transit mixers has been assumed for this purpose. The life cycle cost has been calculated for the system of the ready mix concrete plant and transit mixers.
Suryawanshi, Pramilesh; Raikwar, Akash; Arif, Mohammad; Richardus, Jan Hendrik
2018-01-01
Background Leprosy is a major public health problem in many low and middle income countries, especially in India, and contributes considerably to the global burden of the disease. Leprosy and poverty are closely associated, and therefore the economic burden of leprosy is a concern. However, evidence on patient’s expenditure is scarce. In this study, we estimate the expenditure in primary care (outpatient) by leprosy households in two different public health settings. Methodology/Principal findings We performed a cross-sectional study, comparing the Union Territory of Dadra and Nagar Haveli with the Umbergaon block of Valsad, Gujrat, India. A household (HH) survey was conducted between May and October, 2016. We calculated direct and indirect expenditure by zero inflated negative binomial and negative binomial regression. The sampled households were comparable on socioeconomic indicators. The mean direct expenditure was USD 6.5 (95% CI: 2.4–17.9) in Dadra and Nagar Haveli and USD 5.4 (95% CI: 3.8–7.9) per visit in Umbergaon. The mean indirect expenditure was USD 8.7 (95% CI: 7.2–10.6) in Dadra and Nagar Haveli and USD 12.4 (95% CI: 7.0–21.9) in Umbergaon. The age of the leprosy patients and type of health facilities were the major predictors of total expenditure on leprosy primary care. The higher the age, the higher the expenditure at both sites. The private facilities are more expensive than the government facilities at both sites. If the public health system is enhanced, government facilities are the first preference for patients. Conclusions/Significance An enhanced public health system reduces the patient’s expenditure and improves the health seeking behaviour. We recommend investing in health system strengthening to reduce the economic burden of leprosy. PMID:29300747
McMeekin, J C; Billings, R W
1994-04-01
Crozer-Keystone Health System, with corporate headquarters in Media, PA, is relatively new. The system was formed in 1990 to integrate four hospitals--roughly 1,160 acute care beds--five long-term care facilities, skilled nursing facilities and personal care facilities. According to President and CEO John C. McMeekin, the system comprises "very aggressive" programs in senior wellness, geriatric care, women's and children's health, behavioral medicine and psychiatric substance abuse. And it also has a large managed care organization that was undertaken as part of a joint venture with members of the hospitals' medical staff. The system is still defining itself, and perhaps that's why it has been willing to venture into an area that is virtually unique among health care organizations: using community health status indicators as part of the CEO's annual evaluation and compensation. Recently, Trustee editor Karen Gardner spoke to McMeekin and board Chairman Richard W. Billings about a major community needs assessment project that the system undertook in 1991 and how it is using the results of that study.
NASA Astrophysics Data System (ADS)
1981-09-01
Main elements of the design are identified and explained, and the rationale behind them was reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are presented, and the engineering issues that should be reexamined are identified. The latest (1980-1981) information from the MHD technology program is integrated with the elements of a conventional steam power electric generating plant.
Steam Plant at the Aircraft Engine Research Laboratory
1945-09-21
The Steam Plant at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory supplies steam to the major test facilities and office buildings. Steam is used for the Icing Research Tunnel's spray system and the Engine Research Building’s desiccant air dryers. In addition, its five boilers supply heat to various buildings and the cafeteria. Schirmer-Schneider Company built the $141,000 facility in the fall of 1942, and it has been in operation ever since.
ERIC Educational Resources Information Center
Campaign for Fiscal Equity, Inc., 2004
2004-01-01
In recent years, court mandates in education adequacy cases have resulted in substantial increases in state-level support for local building needs in a number of states. The Court of Appeals' decision in "CFE v. State of New York" has made clear that extensive facilities deficiencies in New York City constitute a major constitutional…
NASA Technical Reports Server (NTRS)
1981-01-01
Main elements of the design are identified and explained, and the rationale behind them was reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are presented, and the engineering issues that should be reexamined are identified. The latest (1980-1981) information from the MHD technology program is integrated with the elements of a conventional steam power electric generating plant.
A demonstration of a low cost approach to security at shipping facilities and ports
NASA Astrophysics Data System (ADS)
Huck, Robert C.; Al Akkoumi, Mouhammad K.; Herath, Ruchira W.; Sluss, James J., Jr.; Radhakrishnan, Sridhar; Landers, Thomas L.
2010-04-01
Government funding for the security at shipping facilities and ports is limited so there is a need for low cost scalable security systems. With over 20 million sea, truck, and rail containers entering the United States every year, these facilities pose a large risk to security. Securing these facilities and monitoring the variety of traffic that enter and leave is a major task. To accomplish this, the authors have developed and fielded a low cost fully distributed building block approach to port security at the inland Port of Catoosa in Oklahoma. Based on prior work accomplished in the design and fielding of an intelligent transportation system in the United States, functional building blocks, (e.g. Network, Camera, Sensor, Display, and Operator Console blocks) can be assembled, mixed and matched, and scaled to provide a comprehensive security system. The following functions are demonstrated and scaled through analysis and demonstration: Barge tracking, credential checking, container inventory, vehicle tracking, and situational awareness. The concept behind this research is "any operator on any console can control any device at any time."
Tethered orbital propellant depot
NASA Technical Reports Server (NTRS)
Fester, D. A.; Rudolph, L. K.; Kiefel, E. R.
1985-01-01
A planned function of the Space Station is to refurbish and refuel an advanced space-based LO2/LH2 orbit transfer vehicle. An alternative to propellant storage at the station is to use a remote facility tied to the station with a log tether. Preliminary design of such a facility is described with emphasis on fluid transfer and storage requirements. Using tether lengths of at least 300 ft, gravity gradient forces will dominate surface tension in such a system. Although gravity given transfer is difficult because of line pressure drops, fluid settling over the tank outlet greatly alleviates acquisition concerns and will facilitate vented tank fills. The major concern with a tethered orbital refueling facility is its considerable operational complexity including transport of the OTV to and from the facility.
NASA Astrophysics Data System (ADS)
Barnes, P. R.; Vance, E. F.
A nuclear detonation at altitudes several hundred kilometers above the earth will severely distort the earth's magnetic field and result in a strong magnetohydrodynamic electromagnetic pulse (MHD-EMP). The geomagnetic disturbance interacts with the soil to induce current and horizontal electric gradients. MHD-EMP, also called E3 since it is the third component of the high-altitude EMP (HEMP), lasts over 100 s after an exoatmospheric burst. MHD-EMP is similar to solar geomagnetic storms in it's global and low frequency (less than 1 Hz) nature except that E3 can be much more intense with a far shorter duration. When the MHD-EMP gradients are integrated over great distances by power lines, communication cables, or other long conductors, the induced voltages are significant. (The horizontal gradients in the soil are too small to induce major responses by local interactions with facilities.) The long pulse waveform for MHD-EMP-induced currents on long lines has a peak current of 200 A and a time-to-half-peak of 100 s. If this current flows through transformer windings, it can saturate the magnetic circuit and cause 60 Hz harmonic production. To mitigate the effects of MHD-EMP on a facility, long conductors must be isolated from the building and the commercial power harmonics and voltage swings must be addressed. The transfer switch would be expected to respond to the voltage fluctuations as long as the harmonics have not interfered with the switch control circuitry. The major sources of MHD-EMP induced currents are the commercial power lines and neutral; neutral current indirect coupling to the facility power or ground system via the metal fence, powered gate, parking lights, etc; metal water pipes; phone lines; and other long conductors that enter or come near the facility. The major source of harmonics is the commercial power system.
Olstad, Dana Lee; Poirier, Kelly; Naylor, Patti-Jean; Shearer, Cindy; Kirk, Sara F L
2015-08-01
To assess agreement among three nutrient profiling systems used to evaluate the healthfulness of vending machine products in recreation and sport settings in three Canadian provinces. We also assessed whether the nutritional profile of vending machine items in recreation and sport facilities that were adhering to nutrition guidelines (implementers) was superior to that of facilities that were not (non-implementers). Trained research assistants audited the contents of vending machines. Three provincial nutrient profiling systems were used to classify items into each province's most, moderately and least healthy categories. Agreement among systems was assessed using weighted κ statistics. ANOVA assessed whether the average nutritional profile of vending machine items differed according to province and guideline implementation status. Eighteen recreation and sport facilities in three Canadian provinces. One-half of facilities were implementing nutrition guidelines. Snacks (n 531) and beverages (n 618) within thirty-six vending machines were audited. Overall, the systems agreed that the majority of items belonged within their respective least healthy categories (66-69 %) and that few belonged within their most healthy categories (14-22 %). Agreement among profiling systems was moderate to good, with κ w values ranging from 0·49 to 0·69. Implementers offered fewer of the least healthy items (P<0·05) and these items had a better nutritional profile compared with items in non-implementing facilities. The policy outcomes of the three systems are likely to be similar, suggesting there may be scope to harmonize nutrient profiling systems at a national level to avoid unnecessary duplication and support food reformulation by industry.
Gosain, Mudita; Goel, Akhil D; Kharya, Pradeep; Agarwal, Ramesh; Amarchand, Ritvik; Rai, Sanjay K; Kapoor, Suresh; Paul, Vinod K; Krishnan, Anand
2017-10-01
Planning a comprehensive program addressing neonatal mortality will require a detailed situational analysis of available neonatal-specific health infrastructure. We identified facilities providing essential and sick neonatal care (ENC, SNC) by a snowballing technique in Ballabgarh Block. These were assessed for infrastructure, human resource and equipment along with self-rated competency of the staff and compared with facility-based or population-based norms. A total of 35 facilities providing ENC and 10 facilities for SNC were identified. ENC services were largely in the public-sector domain (68.5% of births) and were well distributed in the block. SNC burden was largely being borne by the private sector (66% of admissions), which was urban-based. The private sector and nurses reported lower competency especially for SNC. Only 53.9% of government facilities and 17.5% of private facilities had a fully equipped newborn care corner. Serious efforts to reduce neonatal mortality would require major capacity strengthening of the health system, including that of the private sector. © The Author [2017]. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com
Managing NIF safety equipment in a high neutron and gamma radiation environment.
Datte, Philip; Eckart, Mark; Jackson, Mark; Khater, Hesham; Manuel, Stacie; Newton, Mark
2013-06-01
The National Ignition Facility (NIF) is a 192 laser beam facility that supports the Inertial Confinement Fusion program. During the ignition experimental campaign, the NIF is expected to perform shots with varying fusion yield producing 14 MeV neutrons up to 20 MJ or 7.1 × 10(18) neutrons per shot and a maximum annual yield of 1,200 MJ. Several infrastructure support systems will be exposed to varying high yield shots over the facility's 30-y life span. In response to this potential exposure, analysis and testing of several facility safety systems have been conducted. A detailed MCNP (Monte Carlo N-Particle Transport Code) model has been developed for the NIF facility, and it includes most of the major structures inside the Target Bay. The model has been used in the simulation of expected neutron and gamma fluences throughout the Target Bay. Radiation susceptible components were identified and tested to fluences greater than 10(13) (n cm(-2)) for 14 MeV neutrons and γ-ray equivalent. The testing includes component irradiation using a 60Co gamma source and accelerator-based irradiation using 4- and 14- MeV neutron sources. The subsystem implementation in the facility is based on the fluence estimates after shielding and survivability guidelines derived from the dose maps and component tests results. This paper reports on the evaluation and implementation of mitigations for several infrastructure safety support systems, including video, oxygen monitoring, pressure monitors, water sensing systems, and access control interfaces found at the NIF.
How Common is Common Use Facilities at Airports
NASA Astrophysics Data System (ADS)
Barbeau, Addison D.
This study looked at common use airports across the country and at the implementation of common use facailities at airports. Common use consists of several elements that maybe installed at an airport. One of the elements is the self-service kiosks that allow passengers to have a faster check-in process, therefore moving them more quickly within the airport. Another element is signage and the incorporation of each airline's logo. Another aspect of common useis an airport regaining control of terminal gates by reducing the number of gates that are exclusively leased to a specific air carrier. This research focused on the current state of the common use facilities across the United States and examines the advantages and disadvantages of this approach. The research entailed interviews with personnel at a wide range of airports and found that each airport is in a different stage of implementation; some have fully implemented the common use concept while others are in the beginning stages of implementation. The questions were tailored to determine what the advantages and disadvantages are of a common use facility. The most common advantages reported included flexibility and cost. In the commom use system the airport reserves the right to move any airline to a different gate at any time for any reason. In turn, this helps reduce gates delays at that facility. For the airports that were interviewed no major disadvantages were reported. One down side of common use facilities for the airport involved is the major capital cost that is required to move to a common use system.
Space Launch System Booster Passes Major Ground Test
2015-03-11
The largest, most powerful rocket booster ever built successfully fired up Wednesday for a major-milestone ground test in preparation for future missions to help propel NASA’s Space Launch System (SLS) rocket and Orion spacecraft to deep space destinations, including an asteroid and Mars. The booster fired for two minutes, the same amount of time it will fire when it lifts the SLS off the launch pad, and produced about 3.6 million pounds of thrust. The test was conducted at the Promontory, Utah test facility of commercial partner Orbital ATK.
Flexible manufacturing of aircraft engine parts
NASA Astrophysics Data System (ADS)
Hassan, Ossama M.; Jenkins, Douglas M.
1992-06-01
GE Aircraft Engines, a major supplier of jet engines for commercial and military aircraft, has developed a fully integrated manufacturing facility to produce aircraft engine components in flexible manufacturing cells. This paper discusses many aspects of the implementation including process technologies, material handling, software control system architecture, socio-technical systems and lessons learned. Emphasis is placed on the appropriate use of automation in a flexible manufacturing system.
In Search of Cost-Effective Schools.
ERIC Educational Resources Information Center
Raywid, Mary Anne; Shaheen, Thomas A.
1994-01-01
Examines major cost-effectiveness proposals, describing developments that highlight concerns over making schools cost effective. The article discusses ways to blend the concerns of educational quality, equity, and costs (district consolidations, shared service and facilities arrangements, new accountability strategies, new information systems,…
Animal research on the Space Station
NASA Technical Reports Server (NTRS)
Bonting, S. L.; Arno, R. D.; Corbin, S. D.
1987-01-01
The need for in-depth, long- and short-term animal experimentation in space to qualify man for long-duration space missions, and to study the effects of the absence and presence of Earth's gravity and of heavy particle radiation on the development and functioning of vertebrates is described. The major facilities required for these investigations and to be installed on the Space Station are: modular habitats for holding rodents and small primates in full bioisolation; a habitat holding facility; 1.8 and 4.0 m dia centrifuges; a multipurpose workbench; and a cage cleaner/disposal system. The design concepts, functions, and characteristics of these facilities are described.
NASA Technical Reports Server (NTRS)
Gray, C. E., Jr.; Snyder, R. E.; Taylor, J. T.; Cires, A.; Fitzgerald, A. L.; Armistead, M. F.
1980-01-01
Preliminary design studies are presented which consider the important parameters in providing 250 knot test velocities at the Aircraft Landing Dynamics Facility. Four major components of this facility are: the hydraulic jet catapult, the test carriage structure, the reaction turning bucket, and the wheels. Using the hydraulic-jet catapult characteristics, a target design point was selected and a carriage structure was sized to meet the required strength requirements. The preliminary design results indicate that to attain 250 knot test velocities for a given hydraulic jet catapult system, a carriage mass of 25,424 kg (56,000 lbm.) cannot be exceeded.
NASA Ames aerospace systems directorate research
NASA Technical Reports Server (NTRS)
Albers, James A.
1991-01-01
The Aerospace Systems Directorate is one of four research directorates at the NASA Ames Research Center. The Directorate conducts research and technology development for advanced aircraft and aircraft systems in intelligent computational systems and human-machine systems for aeronautics and space. The Directorate manages research and aircraft technology development projects, and operates and maintains major wind tunnels and flight simulation facilities. The Aerospace Systems Directorate's research and technology as it relates to NASA agency goals and specific strategic thrusts are discussed.
Status of NASA/Army rotorcraft research and development piloted flight simulation
NASA Technical Reports Server (NTRS)
Condon, Gregory W.; Gossett, Terrence D.
1988-01-01
The status of the major NASA/Army capabilities in piloted rotorcraft flight simulation is reviewed. The requirements for research and development piloted simulation are addressed as well as the capabilities and technologies that are currently available or are being developed by NASA and the Army at Ames. The application of revolutionary advances (in visual scene, electronic cockpits, motion, and modelling of interactive mission environments and/or vehicle systems) to the NASA/Army facilities are also addressed. Particular attention is devoted to the major advances made in integrating these individual capabilities into fully integrated simulation environment that were or are being applied to new rotorcraft mission requirements. The specific simulators discussed are the Vertical Motion Simulator and the Crew Station Research and Development Facility.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blum, T.W.; Selvage, R.D.; Courtney, K.H.
This manual is the guide for initiating change at the Plutonium Facility, which handles the processing of plutonium as well as research on plutonium metallurgy. It describes the change and work control processes employed at TA-55 to ensure that all proposed changes are properly identified, reviewed, approved, implemented, tested, and documented so that operations are maintained within the approved safety envelope. All Laboratory groups, their contractors, and subcontractors doing work at TA-55 follow requirements set forth herein. This manual applies to all new and modified processes and experiments inside the TA-55 Plutonium Facility; general plant project (GPP) and line itemmore » funded construction projects at TA-55; temporary and permanent changes that directly or indirectly affect structures, systems, or components (SSCs) as described in the safety analysis, including Facility Control System (FCS) software; and major modifications to procedures. This manual does not apply to maintenance performed on process equipment or facility SSCs or the replacement of SSCs or equipment with documented approved equivalents.« less
2009-11-19
CAPE CANAVERAL, Fla. – NASA Kennedy Space Center Director Bob Cabana addresses the audience on hand for the unveiling of NASA's first large-scale solar power generation facility at Kennedy in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
The Advanced Technology Development Center (ATDC)
NASA Technical Reports Server (NTRS)
Clements, G. R.; Willcoxon, R. (Technical Monitor)
2001-01-01
NASA is building the Advanced Technology Development Center (ATDC) to provide a 'national resource' for the research, development, demonstration, testing, and qualification of Spaceport and Range Technologies. The ATDC will be located at Space Launch Complex 20 (SLC-20) at Cape Canaveral Air Force Station (CCAFS) in Florida. SLC-20 currently provides a processing and launch capability for small-scale rockets; this capability will be augmented with additional ATDC facilities to provide a comprehensive and integrated in situ environment. Examples of Spaceport Technologies that will be supported by ATDC infrastructure include densified cryogenic systems, intelligent automated umbilicals, integrated vehicle health management systems, next-generation safety systems, and advanced range systems. The ATDC can be thought of as a prototype spaceport where industry, government, and academia, in partnership, can work together to improve safety of future space initiatives. The ATDC is being deployed in five separate phases. Major ATDC facilities will include a Liquid Oxygen Area; a Liquid Hydrogen Area, a Liquid Nitrogen Area, and a multipurpose Launch Mount; 'Iron Rocket' Test Demonstrator; a Processing Facility with a Checkout and Control System; and Future Infrastructure Developments. Initial ATDC development will be completed in 2006.
International Space Station (ISS)
2001-02-01
The Marshall Space Flight Center (MSFC) is responsible for designing and building the life support systems that will provide the crew of the International Space Station (ISS) a comfortable environment in which to live and work. Scientists and engineers at the MSFC are working together to provide the ISS with systems that are safe, efficient, and cost-effective. These compact and powerful systems are collectively called the Environmental Control and Life Support Systems, or simply, ECLSS. In this photograph, the life test area on the left of the MSFC ECLSS test facility is where various subsystems and components are tested to determine how long they can operate without failing and to identify components needing improvement. Equipment tested here includes the Carbon Dioxide Removal Assembly (CDRA), the Urine Processing Assembly (UPA), the mass spectrometer filament assemblies and sample pumps for the Major Constituent Analyzer (MCA). The Internal Thermal Control System (ITCS) simulator facility (in the module in the right) duplicates the function and operation of the ITCS in the ISS U.S. Laboratory Module, Destiny. This facility provides support for Destiny, including troubleshooting problems related to the ITCS.
Maughan, R
2012-06-01
The potential dose distribution advantages associated with proton therapy, and particularly with pencil beam scanning (PBS) techniques, have lead to considerable interest in this modality in recent years. However, the large capital expenditure necessary for such a project requires careful financial consideration and business planning. The complexity of the beam delivery systems impacts the capital expenditure and the PBS only systems presently being advocated can reduce these costs. Also several manufacturers are considering "one-room" facilities as less expensive alternatives to multi-room facilities. This presentation includes a brief introduction to beam delivery options (passive scattering, uniform and modulated scanning) and some of the new technologies proposed for providing less expensive proton therapy systems. Based on current experience, data on proton therapy center start-up costs, running costs and the financial challenges associated with making this highly conformal therapy more widely available will be discussed. Issues associated with proton therapy implementation that are key to project success include strong project management, vendor cooperation and collaboration, staff recruitment and training. Time management during facility start up is a major concern, particularly in multi-room systems, where time must be shared between continuing vendor system validation, verification and acceptance testing, and user commissioning and patient treatments. The challenges associated with facility operation during this period and beyond are discussed, focusing on how standardization of process, downtime and smart scheduling can influence operational efficiency. 1. To understand the available choices for proton therapy facilities, the different beam delivery systems and the financial implications associated with these choices. 2. To understand the key elements necessary for successfully implementing a proton therapy program. 3. To understand the challenges associated with on-going facility management to achieve an efficient fully operational system. © 2012 American Association of Physicists in Medicine.
Fife, Caroline E; Walker, David; Farrow, Wade; Otto, Gordon
2007-01-01
Outpatient wound center facility reimbursement for Medicare beneficiaries can be a challenge to determine and obtain. To compare methods of calculating facility service levels for outpatient wound centers and to demonstrate the advantages of an acuity-based billing system (one that incorporates components of facility work that is non-reimbursable by procedure codes and that represents an activity-based costing approach to medical billing), a retrospective study of 5,098 patient encounters contained in a wound care-specific electronic medical record database was conducted. Approximately 500 patient visits to the outpatient wound center of a Texas regional hospital between April 2003 and November 2004 were categorized by service level in documentation and facility management software. Visits previously billed using a time-based system were compared to the Centers for Medicare and Medicaid Services' proposed three-tiered wound size-based system. The time-based system also was compared to an acuity-based scoring system. The Pearson correlation coefficient between billed level of service by time and estimated level of service by acuity was 0.442 and the majority of follow-up visits were billed as Level 3 and above (on a time level of 1 to 5) , confirming that time is not a surrogate for actual work performed. Wound size also was found to be unrelated to service level (Pearson correlation = 0.017) and 97% of wound areas were < 100 cm2. The acuity-based scoring system produced a near-normal distribution of results, producing more mid-range billings than extremes; no other method produced this distribution. Hospital-based outpatient wound centers should develop, review, and refine acuity score-based models on which to determine billed level of service.
Remote sensing and field test capabilities at U.S. Army Dugway Proving Ground
NASA Astrophysics Data System (ADS)
Pearson, James T.; Herron, Joshua P.; Marshall, Martin S.
2011-11-01
U.S. Army Dugway Proving Ground (DPG) is a Major Range and Test Facility Base (MRTFB) with the mission of testing chemical and biological defense systems and materials. DPG facilities include state-of-the-art laboratories, extensive test grids, controlled environment calibration facilities, and a variety of referee instruments for required test measurements. Among these referee instruments, DPG has built up a significant remote sensing capability for both chemical and biological detection. Technologies employed for remote sensing include FTIR spectroscopy, UV spectroscopy, Raman-shifted eye-safe lidar, and other elastic backscatter lidar systems. These systems provide referee data for bio-simulants, chemical simulants, toxic industrial chemicals (TICs), and toxic industrial materials (TIMs). In order to realize a successful large scale open-air test, each type of system requires calibration and characterization. DPG has developed specific calibration facilities to meet this need. These facilities are the Joint Ambient Breeze Tunnel (JABT), and the Active Standoff Chamber (ASC). The JABT and ASC are open ended controlled environment tunnels. Each includes validation instrumentation to characterize simulants that are disseminated. Standoff systems are positioned at typical field test distances to measure characterized simulants within the tunnel. Data from different types of systems can be easily correlated using this method, making later open air test results more meaningful. DPG has a variety of large scale test grids available for field tests. After and during testing, data from the various referee instruments is provided in a visual format to more easily draw conclusions on the results. This presentation provides an overview of DPG's standoff testing facilities and capabilities, as well as example data from different test scenarios.
Remote sensing and field test capabilities at U.S. Army Dugway Proving Ground
NASA Astrophysics Data System (ADS)
Pearson, James T.; Herron, Joshua P.; Marshall, Martin S.
2012-05-01
U.S. Army Dugway Proving Ground (DPG) is a Major Range and Test Facility Base (MRTFB) with the mission of testing chemical and biological defense systems and materials. DPG facilities include state-of-the-art laboratories, extensive test grids, controlled environment calibration facilities, and a variety of referee instruments for required test measurements. Among these referee instruments, DPG has built up a significant remote sensing capability for both chemical and biological detection. Technologies employed for remote sensing include FTIR spectroscopy, UV spectroscopy, Raman-shifted eye-safe lidar, and other elastic backscatter lidar systems. These systems provide referee data for bio-simulants, chemical simulants, toxic industrial chemicals (TICs), and toxic industrial materials (TIMs). In order to realize a successful large scale open-air test, each type of system requires calibration and characterization. DPG has developed specific calibration facilities to meet this need. These facilities are the Joint Ambient Breeze Tunnel (JABT), and the Active Standoff Chamber (ASC). The JABT and ASC are open ended controlled environment tunnels. Each includes validation instrumentation to characterize simulants that are disseminated. Standoff systems are positioned at typical field test distances to measure characterized simulants within the tunnel. Data from different types of systems can be easily correlated using this method, making later open air test results more meaningful. DPG has a variety of large scale test grids available for field tests. After and during testing, data from the various referee instruments is provided in a visual format to more easily draw conclusions on the results. This presentation provides an overview of DPG's standoff testing facilities and capabilities, as well as example data from different test scenarios.
Numerical aerodynamic simulation facility feasibility study
NASA Technical Reports Server (NTRS)
1979-01-01
There were three major issues examined in the feasibility study. First, the ability of the proposed system architecture to support the anticipated workload was evaluated. Second, the throughput of the computational engine (the flow model processor) was studied using real application programs. Third, the availability reliability, and maintainability of the system were modeled. The evaluations were based on the baseline systems. The results show that the implementation of the Numerical Aerodynamic Simulation Facility, in the form considered, would indeed be a feasible project with an acceptable level of risk. The technology required (both hardware and software) either already exists or, in the case of a few parts, is expected to be announced this year. Facets of the work described include the hardware configuration, software, user language, and fault tolerance.
Indian LSSC (Large Space Simulation Chamber) facility
NASA Technical Reports Server (NTRS)
Brar, A. S.; Prasadarao, V. S.; Gambhir, R. D.; Chandramouli, M.
1988-01-01
The Indian Space Agency has undertaken a major project to acquire in-house capability for thermal and vacuum testing of large satellites. This Large Space Simulation Chamber (LSSC) facility will be located in Bangalore and is to be operational in 1989. The facility is capable of providing 4 meter diameter solar simulation with provision to expand to 4.5 meter diameter at a later date. With such provisions as controlled variations of shroud temperatures and availability of infrared equipment as alternative sources of thermal radiation, this facility will be amongst the finest anywhere. The major design concept and major aspects of the LSSC facility are presented here.
NASA Astrophysics Data System (ADS)
Dougherty, K.; Sarkissian, J.
2002-01-01
The recent Australian film, The Dish, highlighted the role played by the Parkes Radio Telescope in tracking and communicating with the Apollo 11 mission. However the events depicted in this film represent only a single snapshot of the role played by Australian radio astronomy and space tracking facilities in the exploration of the Solar System. In 1960, NASA established its first deep space tracking station outside the United States at Island Lagoon, near Woomera in South Australia. From 1961 until 1972, this station was an integral part of the Deep Space Network, responsible for tracking and communicating with NASA's interplanetary spacecraft. It was joined in 1965 by the Tidbinbilla tracking station, located near Canberra in eastern Australia, a major DSN facility that is still in operation today. Other NASA tracking facilities (for the STADAN and Manned Space Flight networks) were also established in Australia during the 1960s, making this country home to the largest number of NASA tracking facilities outside the United States. At the same time as the Island Lagoon station was being established in South Australia, one of the world's major radio telescope facilities was being established at Parkes, in western New South Wales. This 64-metre diameter dish, designed and operated by the Commonwealth Scientific and Industrial Research Organisation (CSIRO), was also well-suited for deep space tracking work: its design was, in fact, adapted by NASA for the 64-metre dishes of the Deep Space Network. From Mariner II in 1962 until today, the Parkes Radio Telescope has been contracted by NASA on many occasions to support interplanetary spacecraft, as well as the Apollo lunar missions. This paper will outline the role played by both the Parkes Radio Telescope and the NASA facilities based in Australia in the exploration of the Solar System between 1960 and 1976, when the Viking missions landed on Mars. It will outline the establishment and operation of the Deep Space Network in Australia and consider the joint US-Australian agreement under which it was managed. It will also discuss the relationship of the NASA stations to the Parkes Radio Telescope and the integration of Parkes into the NASA network to support specific space missions. The particular involvement of Australian facilities in significant space missions will be highlighted and assessed.
A 12 coil superconducting bumpy torus magnet facility for plasma research
NASA Technical Reports Server (NTRS)
Roth, J. R.; Holmes, A. D.; Keller, T. A.; Krawczonek, W. M.
1972-01-01
A summary is presented of the performance of the two-coil superconducting pilot rig which preceded the NASA Lewis bumpy torus. This pilot rig was operated for 550 experimental runs over a period of 7 years. The NASA Lewis bumpy torus facility consists of 12 superconducting coils, each with a 19 cm in diameter and capable of producing magnetic field strengths of 3.0 teslas on their axes. The magnets are equally spaced around a major circumference 1.52 m in diameter, and are mounted with the major axis of the torus vertical in a single vacuum tank 2.59 m in diameter. The design value of maximum magnetic field on the magnetic axis (3.0 teslas) was reached and exceeded. A maximum magnetic field of 3.23 teslas was held for a period of 60 minutes, and the coils did not go to normal. When the coils were charged to a maximum magnetic field of 3.35 teslas, the coil system was driven normal without damage to the facility.
Unmanned launch vehicle impacts on existing major facilities : V23
DOT National Transportation Integrated Search
1984-10-18
This study measures the impact on the existing major facilities of Space Launch Complex (SLC-6) to accommodate the launching of an Unmanned Launch Vehicle (ULV). Modifications to the existing facilities were determined for two basic vehicle concepts,...
Executive control systems in the engineering design environment. M.S. Thesis
NASA Technical Reports Server (NTRS)
Hurst, P. W.
1985-01-01
An executive control system (ECS) is a software structure for unifying various applications codes into a comprehensive system. It provides a library of applications, a uniform access method through a cental user interface, and a data management facility. A survey of twenty-four executive control systems designed to unify various CAD/CAE applications for use in diverse engineering design environments within government and industry was conducted. The goals of this research were to establish system requirements to survey state-of-the-art architectural design approaches, and to provide an overview of the historical evolution of these systems. Foundations for design are presented and include environmental settings, system requirements, major architectural components, and a system classification scheme based on knowledge of the supported engineering domain(s). An overview of the design approaches used in developing the major architectural components of an ECS is presented with examples taken from the surveyed systems. Attention is drawn to four major areas of ECS development: interdisciplinary usage; standardization; knowledge utilization; and computer science technology transfer.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-07-01
The report presents the results of a feasibility study for the National Load Dispatch Center and Global Communications System Project in Guatemala. The project consists of a communication system which will provide Institute Nacional de Electrificacion (INDE) operations personnel direct voice access to all major power system facilities. In addition, a modern computer based load dispatch center has been configured on a secure and reliable basis to provide automatic generation control of all major interconnected generating plants within Guatemala.
Operator Interface for the ALMA Observing System
NASA Astrophysics Data System (ADS)
Grosbøl, P.; Schilling, M.
2009-09-01
The Atacama Large Millimeter/submillimeter Array (ALMA) is a major new ground-based radio-astronomical facility being constructed in Chile in an international collaboration between Europe, Japan and North America in cooperation with the Republic of Chile. The facility will include 54 12m and 12 7m antennas at the Altiplano de Chajnantor and be operated from the Operations Support Facilities (OSF) near San Pedro. This paper describes design and baseline implementation of the Graphical User Interface (GUI) used by operators to monitor and control the observing facility. It is written in Java and provides a simple plug-in interface which allows different subsystems to add their own panels to the GUI. The design is based on a client/server concept and supports multiple operators to share or monitor operations.
Remote monitoring of a Fire Protection System
NASA Astrophysics Data System (ADS)
Bauman, Steven; Vermeulen, Tom; Roberts, Larry; Matsushige, Grant; Gajadhar, Sarah; Taroma, Ralph; Elizares, Casey; Arruda, Tyson; Potter, Sharon; Hoffman, James
2011-03-01
Some years ago CFHT proposed developing a Remote Observing Environment aimed at producing Science Observations at their Observatory Facility on Mauna Kea from their Headquarters facility in Waimea, HI. This Remote Observing Project commonly referred to as OAP (Observatory Automation Project) was completed at the end of January 2011 and has been providing the majority of Science Data since. My poster will discuss the upgrades to the existing fire alarm protection system. With no one at the summit during nightly operations, the observatory facility required automated monitoring of the facility for safety to personnel and equipment in the case of a fire. An addressable analog fire panel was installed which utilizes digital communication protocol (DCP), intelligent communication with other devices, and an RS-232 interface which provides feedback and real-time monitoring of the system. Using the interface capabilities of the panel, it provides notifications when heat detectors, smoke sensors, manual pull stations, or the main observatory computer room fire suppression system has been activated. The notifications are sent out as alerts to staff in the form of test massages and emails and the observing control GUI interface alerts the remote telescope operator with a map showing the location of the fire occurrence and type of device that has been triggered. And all of this was accomplished without the need for an outside vendor to monitor the system and facilitate warnings or notifications regarding the system.
NREL Leads Energy Systems Integration, Continuum Magazine: Issue 4 (Book)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2013-04-01
Continuum Magazine showcases NREL's latest and most impactful clean energy innovations. This issue, 'NREL Leads Energy Systems Integration' explores the discipline of energy systems integration, in particular the role of the laboratory's new, one-of-a-kind Energy System Integration Facility. NREL scientists, engineers, and analysts deeply understand the fundamental science and technologies underpinning major energy producing and consuming systems, as well as the transmission infrastructure and communications and data networks required to integrate energy systems at all scales.
Steam atmosphere dryer project: System development and field test. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-02-01
The objective of this project was to develop and demonstrate the use of a superheated steam atmosphere dryer as a highly improved alternative to conventional hot air-drying systems, the present industrial standard method for drying various wet feedstocks. The development program plan consisted of three major activities. The first was engineering analysis and testing of a small-scale laboratory superheated steam dryer. This dryer provided the basic engineering heat transfer data necessary to design a large-scale system. The second major activity consisted of the design, fabrication, and laboratory checkout testing of the field-site prototype superheated steam dryer system. The third majormore » activity consisted of the installation and testing of the complete 250-lb/hr evaporation rate dryer and a 30-kW cogeneration system in conjunction with an anaerobic digester facility at the Village of Bergen, NY. Feedstock for the digester facility at the Village of Bergen, NY. Feedstock for the digester was waste residue from a nearby commercial food processing plant. The superheated steam dryer system was placed into operation in August 1996 and operated successfully through March 1997. During this period, the dryer processed all the material from the digester to a powdered consistency usable as a high-nitrogen-based fertilizer.« less
Preliminary definition of a lunar landing and launch facility (Complex 39L)
NASA Technical Reports Server (NTRS)
Matthews, H. Dennis; Jenson, Eric B.; Linsley, Jerald N.
1992-01-01
A preliminary definition of a lunar landing and launch facility has been formulated. A permanently manned lunar base and a baseline lunar module are assumed. The major features of the facility are specified and major design areas are described.
Experimental land observing data system feasibility study
NASA Technical Reports Server (NTRS)
Buckley, J. L.; Kraiman, H.
1982-01-01
An end-to-end data system to support a Shuttle-based Multispectral Linear Array (MLA) mission in the mid-1980's was defined. The experimental Land Observing System (ELOS) is discussed. A ground system that exploits extensive assets from the LANDSAT-D Program to effectively meet the objectives of the ELOS Mission was defined. The goal of 10 meter pixel precision, the variety of data acquisition capabilities, and the use of Shuttle are key to the mission requirements, Ground mission management functions are met through the use of GSFC's Multi-Satellite Operations Control Center (MSOCC). The MLA Image Generation Facility (MIGF) combines major hardware elements from the Applications Development Data System (ADDS) facility and LANDSAT Assessment System (LAS) with a special purpose MLA interface unit. LANDSAT-D image processing techniques, adapted to MLA characteristics, form the basis for the use of existing software and the definition of new software required.
NASA Technical Reports Server (NTRS)
Craig, Roy R., Jr.
1987-01-01
The major accomplishments of this research are: (1) the refinement and documentation of a multi-input, multi-output modal parameter estimation algorithm which is applicable to general linear, time-invariant dynamic systems; (2) the development and testing of an unsymmetric block-Lanzcos algorithm for reduced-order modeling of linear systems with arbitrary damping; and (3) the development of a control-structure-interaction (CSI) test facility.
PCS: a pallet costing system for wood pallet manufacturers (version 1.0 for Windows®)
A. Jefferson, Jr. Palmer; Cynthia D. West; Bruce G. Hansen; Marshall S. White; Hal L. Mitchell
2002-01-01
The Pallet Costing System (PCS) is a computer-based, Microsoft Windows® application that computes the total and per-unit cost of manufacturing an order of wood pallets. Information about the manufacturing facility, along with the pallet-order requirements provided by the customer, is used in determining production cost. The major cost factors addressed by PCS...
An Overview of Facilities and Capabilities to Support the Development of Nuclear Thermal Propulsion
DOE Office of Scientific and Technical Information (OSTI.GOV)
James Werner; Sam Bhattacharyya; Mike Houts
Abstract. The future of American space exploration depends on the ability to rapidly and economically access locations of interest throughout the solar system. There is a large body of work (both in the US and the Former Soviet Union) that show that Nuclear Thermal Propulsion (NTP) is the most technically mature, advanced propulsion system that can enable this rapid and economical access by its ability to provide a step increase above what is a feasible using a traditional chemical rocket system. For an NTP system to be deployed, the earlier measurements and recent predictions of the performance of the fuelmore » and the reactor system need to be confirmed experimentally prior to launch. Major fuel and reactor system issues to be addressed include fuel performance at temperature, hydrogen compatibility, fission product retention, and restart capability. The prime issue to be addressed for reactor system performance testing involves finding an affordable and environmentally acceptable method to test a range of engine sizes using a combination of nuclear and non-nuclear test facilities. This paper provides an assessment of some of the capabilities and facilities that are available or will be needed to develop and test the nuclear fuel, and reactor components. It will also address briefly options to take advantage of the greatly improvement in computation/simulation and materials processing capabilities that would contribute to making the development of an NTP system more affordable. Keywords: Nuclear Thermal Propulsion (NTP), Fuel fabrication, nuclear testing, test facilities.« less
Mississippi River Navigation System. Environmental Evaluations of Proposed Mooring Facilities.
1982-03-01
crayfish, oligochetes, nematodes , snails, clams, mussels and tubifex worms. Fish commonly found in the Kentucky River and tributaries are carp, drum...Arkansas portion of the basin. Cotton, soybeans, and rice predominate, with peaches, grapes , cattle, pasture and poultry as major farm products above
Laboratory services series: a programmed maintenance system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuxbury, D.C.; Srite, B.E.
1980-01-01
The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.
10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... exempt from the requirements of this section. [48 FR 33820, July 25, 1983] Report of Major Electric...
Programming Language CAMIL II: Implementation and Evaluation.
ERIC Educational Resources Information Center
Gardner, Edward
A reimplementation of Computer assisted/managed instruction language (CAMIL) for qualitative and quantitative improvements in the software is presented. The reformatted language is described narratively, and major components of the system software are indicated and discussed. Authoring aids and imbedded support facilities are also described, and…
48 CFR 923.7001 - Nuclear safety.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Nuclear safety. 923.7001... Efficiency, Renewable Energy Technologies, and Occupational Safety Programs 923.7001 Nuclear safety. The DOE regulates the nuclear safety of its major facilities under its own statutory authority derived from the...
NASA Technical Reports Server (NTRS)
Scarpa, Philip J.; Williams, Richard
2009-01-01
NASA maintains on site occupational health clinics at all Centers and major facilities NASA maintains an on-site clinic that offers comprehensive health care to astronauts at the Johnson Space Center NASA deploys limited health care capability to space and extreme environments Focus is always on preventive health care
48 CFR 923.102 - Applicability to contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... 923.102 Applicability to contractors. Many of the Department's major facilities are operated by contractors. Provisions regarding those contracts may be found at Part 970 of this chapter. At other locations...
2004-01-22
KENNEDY SPACE CENTER, FLA. - Standing on a workstand (at left) in the Orbiter Processing Facility is Stephanie Stilson, NASA vehicle manager for Discovery. She is being filmed for a special feature on the KSC Web about the recent Orbiter Major Modification period on Discovery, which included inspection, modifications and reservicing of most systems onboard, plus installation of a Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.” The orbiter is now being prepared for eventual launch on a future mission.
2004-01-22
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, Stephanie Stilson, NASA vehicle manager for Discovery, stands in front of a leading edge on the wing of Discovery. She is being filmed for a special feature on the KSC Web about the recent Orbiter Major Modification period on Discovery, which included inspection, modifications and reservicing of most systems onboard, plus installation of a Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.” The orbiter is now being prepared for eventual launch on a future mission.
Mendis, S.; Al Bashir, Igbal; Dissanayake, Lanka; Varghese, Cherian; Fadhil, Ibtihal; Marhe, Esha; Sambo, Boureima; Mehta, Firdosi; Elsayad, Hind; Sow, Idrisa; Algoe, Maltie; Tennakoon, Herbert; Truong, Lai Die; Lan, Le Thi Tuyet; Huiuinato, Dismond; Hewageegana, Neelamni; Fahal, Naiema A. W.; Mebrhatu, Goitom; Tshering, Gado; Chestnov, Oleg
2012-01-01
Objective. The objective was to evaluate the capacity of primary care (PC) facilities to implement basic interventions for prevention and management of major noncommunicable diseases (NCDs), including cardiovascular diseases and diabetes. Methods. A cross-sectional survey was done in eight low- and middle-income countries (Benin, Bhutan, Eritrea, Sri Lanka, Sudan, Suriname, Syria, and Vietnam) in 90 PC facilities randomly selected. The survey included questions on the availability of human resources, equipment, infrastructure, medicines, utilization of services, financing, medical information, and referral systems. Results and Conclusions. Major deficits were identified in health financing, access to basic technologies and medicines, medical information systems, and the health workforce. The study has provided the foundation for strengthening PC to address noncommunicable diseases. There are important implications of the findings of this study for all low- and middle-income countries as capacity of PC is fundamental for equitable prevention and control of NCDs. PMID:23251789
2003-12-09
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, KSC employee Chris Moore repairs tile on the forward area of the orbiter Discovery. The vehicle has undergone Orbiter Major Modifications in the past year, which includes tile check and repair. The tiles are part of the Orbiter Thermal Protection System, thermal shields to protect against temperatures as high as 3,000° Fahrenheit, which are produced during descent for landing. Discovery is scheduled to fly on mission STS-121 to the International Space Station.
2009-11-19
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, recipients of a NASA Team Award for their parts in the successful construction of NASA's first large-scale solar power generation facility pose for a group portrait. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2009-11-19
CAPE CANAVERAL, Fla. – Florida Power & Light Company Vice President and Chief Development Officer Eric Silagy, left, and NASA Kennedy Space Center Director Bob Cabana, center, examine one of the solar panels at the unveiling of NASA's first large-scale solar power generation facility at Kennedy in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
A bicycle safety index for evaluating urban street facilities.
Asadi-Shekari, Zohreh; Moeinaddini, Mehdi; Zaly Shah, Muhammad
2015-01-01
The objectives of this research are to conceptualize the Bicycle Safety Index (BSI) that considers all parts of the street and to propose a universal guideline with microscale details. A point system method comparing existing safety facilities to a defined standard is proposed to estimate the BSI. Two streets in Singapore and Malaysia are chosen to examine this model. The majority of previous measurements to evaluate street conditions for cyclists usually cannot cover all parts of streets, including segments and intersections. Previous models also did not consider all safety indicators and cycling facilities at a microlevel in particular. This study introduces a new concept of a practical BSI to complete previous studies using its practical, easy-to-follow, point system-based outputs. This practical model can be used in different urban settings to estimate the level of safety for cycling and suggest some improvements based on the standards.
Latest update of tests and improvements to US Coast Guard viscous oil pumping system.
Drieu, Michael D; Nourse, Peter C; MacKay, Ronald; Cooper, David A; Hvidbak, Flemming
2003-01-01
Over the past nine years, the US Coast Guard has incorporated the prevention through people (PTP) philosophy as a "human factors" approach to learn how maritime operations can be regulated safer and be more efficient by evaluating training, management policies, operational procedures, and establishing partnerships with the maritime industry. One of the key elements of applying a PTP approach is identifying and incorporating lessons learned from major marine casualties and pollution incidents. Since 1997, the US Coast Guard National Strike Force has responded to three major oil spills involving foreign freight vessels grounding, which included the removal of highly viscous oil using various lightering equipment and systems. An informal workgroup consisting of the US Coast Guard, US Navy Supervisor of Salvage (NAVSUPSALV), and various representatives from oil pollution clean-up companies met at the following facilities: the Chevron Asphalt Facility in Edmonds, WA (September 1999), the Oil and Hazardous Materials Simulated Environmental Test Tank (OHMSETT) testing facility in Leonardo, New Jersey (November 1999 and March 2000), the Alaska Clean Seas (ACS) warehouse annex in Prudhoe Bay, AK (October 2000), and Cenac Towing Company facility in Houma, LA (May 2002). The group shared ideas and techniques, and tested different pumps and hose lengths with viscous oil. It was during the early tests that the first quantitative results showed just how efficient lubricated transport of heavy oil product could be, and broadened the knowledge of such methods to the entire industry. Although this technology had existed for many years in the oil production and handling industry, its use had never been investigated in a laboratory setting with regard to salvage response lightering systems.
Hybrid Propulsion In-Situ Resource Utilization Test Facility Results
NASA Technical Reports Server (NTRS)
Karp, Ashley Chandler; Nakazono, Barry; Vaughan, David; Warner, William N.
2015-01-01
Hybrid rockets present a promising alternative to conventional chemical propulsion systems for In-Situ Resource Utilization (ISRU) and in-space applications. While they have many benefits for these applications, there are still many small details that require research before they can be adopted into flight systems. A flexible test facility was developed at JPL to test operation of hybrid motors at small scale (5 cm outer diameter fuel grains) over a range of conditions. Specifically, this paper studies two of the major advantages: low temperature performance and throttling. Paraffin-based hybrid rockets are predicted to have good performance at low temperatures. This could significantly decrease the overall system mass by minimizing the thermal conditioning required for Mars or outer planet applications. Therefore, the coefficient of thermal expansion and glass transition of paraffin are discussed. Additionally, deep throttling has been considered for several applications. This was a natural starting point for hotfire testing using the hybrid propulsion ISRU test facility. Additionally, short length to diameter ratio (L/D) fuel grains are tested to determine if these systems can be packaged into geometrically constrained spaces.
45 CFR 1309.52 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...
45 CFR 1309.52 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...
City of Raleigh, Wilders Grove Service Center, Solid Waste Services Facility. Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Cox; Bill Black; Battle, Fred
Final Report for DOE Grant EE0002808. Grant award was for technology demonstration of geothermal energy systems. One of the major objectives identified for the demonstration portion of the grant was to prove the viability of Ground Source Heat Pump (GSHP) systems in significantly reducing energy usage of HVAC and domestic water heating systems compared to traditional systems. Data were monitored and conclusions drawn, including estimating payback timeframes and documenting lessons learned.
Availability and affordability of antimalarial and antibiotic medicines in Malawi
Khuluza, Felix
2017-01-01
Background Availability and affordability of medicines are key determinants of universal health coverage, yet achieving them presents a major challenge especially in low-income countries. We here present an analysis of availability and prices of antimalarial and antibiotic medicines in public, faith-based and private health facilities in Malawi. Medicines are provided free of charge in the public health care system of Malawi. In contrast, facilities of the Christian Health Association of Malawi (CHAM) usually charge their patients for medicines, as do private for-profit facilities. Methods As part of a study on medicine quality, samples of six antimalarial and six antibiotic medicines were collected in 31 health facilities in four districts of southern Malawi. These included 15 public facilities (i.e. health centres, district hospitals and central hospitals), eight CHAM and eight private facilities. Random selection was used in choosing the included health facilities. The availability of medicines was recorded, including the number of units which could be collected of each medicine, as well as the prices of medicines which were charged in CHAM and private facilities. These data were analyzed using the standard methodology developed by the World Health Organization (WHO) and Health Action International (HAI). Results Availability of the antimalarials artemether/lumefantrine and sulfadoxine/pyrimethamine, which are provided with financial support from international donors, was high in public and CHAM facilities (93% and 100%, respectively). However, availability of antibiotics was much lower (e.g. 40% availability of amoxicillin tablets/capsules in public health centres). Medicine prices were lower than reported from many other countries. The median price ratio (MPR) to a wholesale international procurement price was 2.8 in CHAM facilities and even lower in the private sector (MPR 2.3). Nevertheless, for 10 of the 12 investigated medicines the cost for one course of treatment exceeded the daily wage of a low-paid government worker in Malawi and therefore had to be considered as unaffordable for a major part of the population. Conclusions Continued efforts are required to improve the availability of essential medicines in Malawi. The free provision of medicines in the public health care system remains important in order to achieve universal health coverage, due to the low income in this country. PMID:28419126
Hypersonic technology-approach to an expanded program
NASA Technical Reports Server (NTRS)
Hearth, D. P.; Preyss, A. E.
1976-01-01
An overview of research, testing, and technology in the hypersonic range. Military and civilian hypersonic flight systems envisaged, ground testing facilities under development, methods for cooling the heated airframe, and use of hydrogen as fuel and coolant are discussed extensively. Air-breathing hypersonic cruise systems are emphasized, the airframe-integrated scramjet configuration is discussed and illustrated, materials proposed for hypersonic vehicles are reviewed, and test results on hypersonic flight (X-15 research aircraft) are indicated. Major advances and major problems in hypersonic flight and hypersonic technology are outlined, and the need for a hypersonic flying-laboratory research craft is stressed.
National Space Transportation Systems Program mission report
NASA Technical Reports Server (NTRS)
Collins, M. A., Jr.; Aldrich, A. D.; Lunney, G. S.
1984-01-01
The STS 41-C National Space Transportation Systems Program Mission Report contains a summary of the major activities and accomplishments of the eleventh Shuttle flight and fifth flight of the OV-099 vehicle, Challenger. Also summarized are the significant problems that occurred during STS 41-C, and a problem tracking list that is a complete list of all problems that occurred during the flight. The major objectives of flight STS 41-C were to successfully deploy the LDEF (long duration exposure facility) and retrieve, repair and redeploy the SMM (Solar Maximum Mission) spacecraft, and perform functions of IMAX and Cinema 360 cameras.
Brazil upgrades microwave system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Newman, H.S.; Gomes, H.P.
1979-02-01
To provide communications facilities necessary during major construction projects, and for the operation and control of the expanding electric-power network, in 1967 Furnas-Centrais Eletricas SA, Brazil, started installing the first 22 links of its microwave system, from the Botafogo plant in Rio de Janeiro to the Furnas hydro station, and from the Furnas hydro station, southwest, to the Guarulhos plant in Sao Paulo and northwest to the Estreito hydro plant. To accommodate the construction of additional hydroelectric facilities, the second and third microwave-system expansions added nine links from Estreito hydro, northwest, to Marimbondo hydro and 7 links to Itumbiara. Themore » fourth expansion included two links to connect with the Angra dos Reis nuclear generating plant. A modern SCADA system replaced an earlier fault-reporting method, and a means of monitoring performance communications was established.« less
NASA Astrophysics Data System (ADS)
Ivey, M.; Verlinde, J.
2014-12-01
The U.S. Department of Energy (DOE), through its scientific user facility, the Atmospheric Radiation Measurement (ARM) Climate Research Facility, provides scientific infrastructure and data to the international Arctic research community via its research sites located on the North Slope of Alaska. The DOE ARM Program has operated an atmospheric measurement facility in Barrow, Alaska, since 1998. Major upgrades to this facility, including scanning radars, were added in 2010. Facilities and infrastructure to support operations of unmanned aerial systems for science missions in the Arctic and North Slope of Alaska were established at Oliktok Point Alaska in 2013. Tethered instrumented balloons will be used in the near future to make measurements of clouds in the boundary layer including mixed-phase clouds. The Atmospheric Radiation Measurement (ARM) Climate Research Facility is implementing "mega-sites" at the Southern Great Plains and North Slope of Alaska sites. Two workshops were held to gather input from the scientific community on these mega-sites. The NSA workshop was held September 10 and 11 in the Washington DC area. The workshops included discussions of additional profiling remote sensors, detailed measurements of the land-atmosphere interface, aerial operations to link the Barrow and Oliktok sites, unmanned aerial system measurements, and routine large eddy simulation model runs. The "mega-sites" represent a significant new scientific and infrastructure investment by DOE Office of Science, Office of Biological and Environmental Research. This poster will present information on plans for a North Slope "Megasite" as well as new opportunities for members of the arctic research community to make atmospheric measurements using unmanned aerial systems or tethered balloons in conjunction with the DOE ARM facilities on the North Slope of Alaska.
Development of a Large Scale, High Speed Wheel Test Facility
NASA Technical Reports Server (NTRS)
Kondoleon, Anthony; Seltzer, Donald; Thornton, Richard; Thompson, Marc
1996-01-01
Draper Laboratory, with its internal research and development budget, has for the past two years been funding a joint effort with the Massachusetts Institute of Technology (MIT) for the development of a large scale, high speed wheel test facility. This facility was developed to perform experiments and carry out evaluations on levitation and propulsion designs for MagLev systems currently under consideration. The facility was developed to rotate a large (2 meter) wheel which could operate with peripheral speeds of greater than 100 meters/second. The rim of the wheel was constructed of a non-magnetic, non-conductive composite material to avoid the generation of errors from spurious forces. A sensor package containing a multi-axis force and torque sensor mounted to the base of the station, provides a signal of the lift and drag forces on the package being tested. Position tables mounted on the station allow for the introduction of errors in real time. A computer controlled data acquisition system was developed around a Macintosh IIfx to record the test data and control the speed of the wheel. This paper describes the development of this test facility. A detailed description of the major components is presented. Recently completed tests carried out on a novel Electrodynamic (EDS) suspension system, developed by MIT as part of this joint effort are described and presented. Adaptation of this facility for linear motor and other propulsion and levitation testing is described.
NASA Astrophysics Data System (ADS)
Wahid, Fathul; Teduh Dirgahayu, Raden; Hamzah, Almed; Setiaji, Hari
2018-03-01
The clear majority of previous studies have found that the absence of information systems to properly manage data is one of the main challenges in improving public health management. The present study offers an alternate perspective, revealing other emerging problems in cases where there are many information systems in place but without sufficient orchestration. The national government of Indonesia has been coercive in its implementation of various information systems without involving users at public health facilities, which has created many problems on the ground. The problems identified relate to the quality of the disconnected information systems currently in use, the lack of human resource development, unclear procedures, uncoordinated reports and the absence of an incentive scheme. The present study also highlights some practical implications, including the use of a more holistic perspective in designing and developing an integrated public health information infrastructure.
TRAC-PF1 code verification with data from the OTIS test facility. [Once-Through Intergral System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childerson, M.T.; Fujita, R.K.
1985-01-01
A computer code (TRAC-PF1/MOD1) developed for predicting transient thermal and hydraulic integral nuclear steam supply system (NSSS) response was benchmarked. Post-small break loss-of-coolant accident (LOCA) data from a scaled, experimental facility, designated the One-Through Integral System (OTIS), were obtained for the Babcock and Wilcox NSSS and compared to TRAC predictions. The OTIS tests provided a challenging small break LOCA data set for TRAC verification. The major phases of a small break LOCA observed in the OTIS tests included pressurizer draining and loop saturation, intermittent reactor coolant system circulation, boiler-condenser mode, and the initial stages of refill. The TRAC code wasmore » successful in predicting OTIS loop conditions (system pressures and temperatures) after modification of the steam generator model. In particular, the code predicted both pool and auxiliary-feedwater initiated boiler-condenser mode heat transfer.« less
Research Needs for Rural Public Services.
ERIC Educational Resources Information Center
Stocker, Frederick D.
The report proposes a conceptual framework for researching key issues relating to rural public facility policy affecting such services as fire protection, water systems, roads, wastewater treatment, hospitals, and others, and identifies important research needs in this area. Major components of the framework are sources of financing (private and…
National Airspace System Plan: Facilities, Equipment, Associated Development and Other Capital Needs
1989-09-01
yes include: 0 Air carrier routes and services will reflect a * Having an operating National Airspace System better balance between trip frequency and... balanced workload. " A major improvement and integration of the FAA communications system will be imple- 0 Reliable equipment, which minimizes the stress...them in this will lead to the development of production level balancing sector staffing levels, specifications in FY 97. * Trial flight plan function
Supporting SMEs in public sector bids.
James, Edward
2016-03-01
Edward James, workstream lead, Estates, Facilities and Professional Services Workstream, at NHS London Procurement Partnership (pictured), looks at the workings and benefits of Dynamic Purchasing Systems--electronic systems used by a public bodies to purchase commonly used goods, works, or services. One of the major benefits, he explains, is that under a 'DPS'--an 'open market' system revised in 2015--smaller businesses have a greater opportunity to win business than in traditional ('closed') framework agreements.
1991-09-01
34excellent results in the conservation of technical skills, tools, facilities and materials" (18:9). The pioneering efforts of SAC and the subsequent...to the weapon systems successes through recent decades and concepts which were pioneering in the business of system acquisition. According to Sanks...Minuteman system has undergone major physical modifications to enhance its effectiveness. Its longevity continues to be sustained through modifications
2008-06-25
CAPE CANAVERAL, Fla. – This photo shows the area within NASA's Kennedy Space Center where a solar photovoltaic power generation system will be built as the result of an agreement between NASA and Florida Power & Light. The agreement is part of a new initiative that will cut reliance on fossil fuels and improve the environment by reducing greenhouse gas emissions. The major facility will produce an estimated 10 megawatts of electrical power, which can serve roughly 3,000 homes. A separate one-megawatt solar power facility will support the electrical needs of the center.
2008-06-25
CAPE CANAVERAL, Fla. – This map shows the area within NASA's Kennedy Space Center where one of the two solar photovoltaic power generation systems will be built as the result of an agreement between NASA and Florida Power & Light. The agreement is part of a new initiative that will cut reliance on fossil fuels and improve the environment by reducing greenhouse gas emissions. The major facility will produce an estimated 10 megawatts of electrical power, which can serve roughly 3,000 homes. A separate one-megawatt solar power facility will support the electrical needs of the center.
2008-06-25
CAPE CANAVERAL, Fla. – This map shows the area within NASA's Kennedy Space Center where a solar photovoltaic power generation system will be built as the result of an agreement between NASA and Florida Power & Light. The agreement is part of a new initiative that will cut reliance on fossil fuels and improve the environment by reducing greenhouse gas emissions. The major facility will produce an estimated 10 megawatts of electrical power, which can serve roughly 3,000 homes. A separate one-megawatt solar power facility will support the electrical needs of the center.
2008-06-25
CAPE CANAVERAL, Fla. – This map shows the two sites within NASA's Kennedy Space Center where a solar photovoltaic power generation system will be built as the result of an agreement between NASA and Florida Power & Light. The agreement is part of a new initiative that will cut reliance on fossil fuels and improve the environment by reducing greenhouse gas emissions. The major facility will produce an estimated 10 megawatts of electrical power, which can serve roughly 3,000 homes. A separate one-megawatt solar power facility will support the electrical needs of the center.
2008-06-25
CAPE CANAVERAL, Fla. – This map shows the two sites within NASA's Kennedy Space Center where a solar photovoltaic power generation system will be built as the result of an agreement between NASA and Florida Power & Light. The agreement is part of a new initiative that will cut reliance on fossil fuels and improve the environment by reducing greenhouse gas emissions. The major facility will produce an estimated 10 megawatts of electrical power, which can serve roughly 3,000 homes. A separate one-megawatt solar power facility will support the electrical needs of the center.
2008-06-25
CAPE CANAVERAL, Fla. – This photo shows the area within NASA's Kennedy Space Center where a solar photovoltaic power generation system will be built as the result of an agreement between NASA and Florida Power & Light. The agreement is part of a new initiative that will cut reliance on fossil fuels and improve the environment by reducing greenhouse gas emissions. The major facility will produce an estimated 10 megawatts of electrical power, which can serve roughly 3,000 homes. A separate one-megawatt solar power facility will support the electrical needs of the center.
Risk management of liquefied natural gas installations
NASA Technical Reports Server (NTRS)
Fedor, O. H.; Parsons, W. N.; Coutinho, J. De C.
1976-01-01
In connection with the construction of four major liquefied natural gas (LNG) facilities in New York City, the New York City Fire Commissioner has asked NASA for assistance. It was decided that the Kennedy Space Center should develop a risk management system (RMS) for the use of the New York Fire Department (NYFD). The RMS provides for a published set of safety regulations by the NYFD. A description of the RMS is presented as an example of an application of aerospace technology to a civilian sector, namely LNG facilities.
1998-07-06
James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Processing; U.S. Congressman Dave Weldon; and KSC Center Director Roy D. Bridges Jr. Following the ribbon cutting ceremony for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF), KSC employees and media explored the facility. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998
The SSMEPF opens with a ribbon-cutting ceremony
NASA Technical Reports Server (NTRS)
1998-01-01
James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Processing; U.S. Congressman Dave Weldon; and KSC Center Director Roy D. Bridges Jr. Following the ribbon cutting ceremony for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF), KSC employees and media explored the facility. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998.
User Guide for Unmanned Aerial System (UAS) Operations on the National Ranges
2007-11-01
WARFARE CENTER WEAPONS DIVISION, PT. MUGU NAVAL AIR WARFARE CENTER WEAPONS DIVISION, CHINA LAKE NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION, PATUXENT...with IFR Instrument Flight Rules MRTFB Major Range and Test Facility Base NAS National Airspace System NM nautical mile NTIA National...sectional charts, Instrument Flight Rules ( IFR ) enroute charts, and terminal area charts. The floor and ceiling, operating hours, and controlling
Microprocessor control and networking for the amps breadboard
NASA Technical Reports Server (NTRS)
Floyd, Stephen A.
1987-01-01
Future space missions will require more sophisticated power systems, implying higher costs and more extensive crew and ground support involvement. To decrease this human involvement, as well as to protect and most efficiently utilize this important resource, NASA has undertaken major efforts to promote progress in the design and development of autonomously managed power systems. Two areas being actively pursued are autonomous power system (APS) breadboards and knowledge-based expert system (KBES) applications. The former are viewed as a requirement for the timely development of the latter. Not only will they serve as final testbeds for the various KBES applications, but will play a major role in the knowledge engineering phase of their development. The current power system breadboard designs are of a distributed microprocessor nature. The distributed nature, plus the need to connect various external computer capabilities (i.e., conventional host computers and symbolic processors), places major emphasis on effective networking. The communications and networking technologies for the first power system breadboard/test facility are described.
Operational Experience of the Upgraded Cryogenic Systems at the Nscl
NASA Astrophysics Data System (ADS)
McCartney, A. H.; Laumer, H. L.; Jones, S. A.
2010-04-01
The National Superconducting Cyclotron Laboratory (NSCL) is a NSF-supported facility, with additional support from Michigan State University (MSU) for conducting research in nuclear and accelerator science. The facility consists of two superconducting cyclotrons and over fifty individual cryostats, each containing several superconducting magnets that are used in the beam transport system. Beginning in 1999 a major facility upgrade was started. New, larger magnets were added, increasing the total 4.5 K loads, necessitating an increase of the cryogenic capacity. A helium plant (nominal 1750-Watt at 4.5 K) was acquired from the United States Bureau of Mines where it had been operating as a pure liquefier since the early 1980's. It was refurbished for the NSCL with extensive support from the cryogenics group at Thomas Jefferson National Laboratory. The new cryogenic system came online early in 2001. The cold-mass is relatively high in relation to the installed capacity, presenting challenges during cool downs. Reliability over the last five years has been greater than 99%. An overview of the last seven years of operations of our cryogenic systems is presented that includes normal operations, testing of new equipment, noteworthy breakdowns, routine maintenance, and system reliability.
CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ted Berglund; Jeffrey T. Ranney; Carol L. Babb
2001-01-01
The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter. Initial pilot facility shakedown was completed during the fourth quarter. During pilot plant shakedown operations, several production batch test runs were performed. These pilot tests were coupled with laboratory testing to confirm pilot results. In initial batches of operations, cellulose to glucose conversionsmore » of 62.5% and 64.8% were observed in laboratory hydrolysis. As part of this testing, lignin dewatering was tested using laboratory and vendor-supplied filtration equipment. Dewatering tests reported moisture contents in the lignin of between 50% and 60%. Dewatering parameters and options will continue to be investigated during lignin production. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. Shredding of the feed material was completed and final drying of the feed is expected to be completed by late January. Once feed drying is completed, pilot facility production will begin to produce lignin for co-fire testing. Facility modifications are expected to continue to improve facility operations and performance during the first quarter of 2001. The TVA-Colbert facility continues to make progress in evaluating the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system continues.« less
Drug supply strategies, constraints and prospects in Nigeria.
Yusuff, K B; Tayo, F
2004-12-01
The study set out to identify the strategies for public drug supply in Nigeria, assess its functionality, and recommend appropriate means to ensure regular availability of safe, efficacious, good quality and affordable essential drugs at public health facilities. The investigation was carried out at the Directorate of Pharmaceutical services, Federal Ministry of Health (F.M.O.H) Abuja and Federal Medical Stores, Oshodi, Lagos. Semi-structured interview was conducted with key informants at the Department of Food & Drugs, Drug procurement unit and Central Medical store using structured questionnaires and direct informants answers. Our study shows that public drug supply in Nigeria is governed by a National Drug Policy (NDP) which was introduced in 1990 and it is yet to be reviewed after ten years. We also identified the Central Medical Store (CMS) system as the current public drug supply strategy in Nigeria. Public drug supply is mainly financed by governments and this is inadequate to ensure sustained availability of essential drugs. The major procurement methods in use are open tender and direct procurement. These methods as presently operated suffer from late order placement, delay in payment and poor supplier lead-time mainly attributable to lateness in payment for previous drug supplies. These have contributed to stock out of essential drugs at public health facilities. Major losses due to expiration and spoilage are recorded at both central and peripheral storage points despite adequacy of storage facilities and personnel. Road transportation was the major mode of drug distribution from central to peripheral storage points and shortage of vehicle was a key factor affecting drug distribution. There was an apparent lack of a functioning drug management information system to effectively coordinate public drug supply and there are no definite systems that monitor and evaluate staff performance. The CMS strategy currently used for public drug supply in Nigeria has not ensured regular availability of essential drugs at public health facilities. Our study suggests that this is more of an administrative failure. Public drug supply in Nigeria is therefore in need of urgent reforms and this could be achieved through the use of an autonomous drug supply agency to assure efficiency and sustainability.
Industrial accidents triggered by lightning.
Renni, Elisabetta; Krausmann, Elisabeth; Cozzani, Valerio
2010-12-15
Natural disasters can cause major accidents in chemical facilities where they can lead to the release of hazardous materials which in turn can result in fires, explosions or toxic dispersion. Lightning strikes are the most frequent cause of major accidents triggered by natural events. In order to contribute towards the development of a quantitative approach for assessing lightning risk at industrial facilities, lightning-triggered accident case histories were retrieved from the major industrial accident databases and analysed to extract information on types of vulnerable equipment, failure dynamics and damage states, as well as on the final consequences of the event. The most vulnerable category of equipment is storage tanks. Lightning damage is incurred by immediate ignition, electrical and electronic systems failure or structural damage with subsequent release. Toxic releases and tank fires tend to be the most common scenarios associated with lightning strikes. Oil, diesel and gasoline are the substances most frequently released during lightning-triggered Natech accidents. Copyright © 2010 Elsevier B.V. All rights reserved.
Environmental management of construction and demolition waste in Kuwait.
Kartam, Nabil; Al-Mutairi, Nayef; Al-Ghusain, Ibrahim; Al-Humoud, Jasem
2004-01-01
There is an increasing pressure on the construction industry to reduce costs and improve the quality of our environment. The fact is that both of these goals can be achieved at the same time. Although construction and demolition (C&D) constitutes a major source of waste in terms of volume and weight, its management and recycling efforts have not yet seen the light in Kuwait. This study focuses on recycling efforts leading to the minimization of the total C&D waste that is currently landfilled in Kuwait. This paper presents the current status of C&D waste disposal system in Kuwait and identifies the potential problems to the environment, people and economy. Then, it investigates alternative solutions to manage and control this major type of waste in an economically efficient and environmentally safe manner. Next, the paper describes the feasibility of establishing a C&D waste recycling facility in Kuwait. It concludes by highlighting the major benefits and bottleneck problems with such a recycling facility.
Third National Aeronautics and Space Administration Weather and climate program science review
NASA Technical Reports Server (NTRS)
Kreins, E. R. (Editor)
1977-01-01
Research results of developing experimental and prototype operational systems, sensors, and space facilities for monitoring, and understanding the atmosphere are reported. Major aspects include: (1) detection, monitoring, and prediction of severe storms; (2) improvement of global forecasting; and (3) monitoring and prediction of climate change.
Appalachian Regional Commission: 1987 Annual Report.
ERIC Educational Resources Information Center
Russell, Jack, Ed.; And Others
The Appalachian Regional Commission (ARC) used its $105 million appropriation for fiscal year 1987 to support three major program areas in the 13 state region: (1) creating and retaining regional jobs; (2) assisting in construction of basic facilities, particularly water and sewer systems, in the region's 90 poorest counties; and (3) working…
The Arabization of a Full-Text Database Interface.
ERIC Educational Resources Information Center
Fayen, Emily Gallup; And Others
The 1981 design specifications for the Egyptian National Scientific and Technical Information Network (ENSTINET) stipulated that major end-user facilities of the system should be bilingual in English and Arabic. Many characteristics of the Arabic alphabet and language impact computer applications, and there exists no universally accepted character…
The Design of the CCCII and Its Application Considerations in Library Automation.
ERIC Educational Resources Information Center
Huang, Jack Kai-tung; And Others
This paper presents the major characteristics of the Chinese Character Code for Information Interchange (CCCII) and indicates its intended application for the interchange of Chinese information among computer systems and communication facilities, especially in library networks. It is considered sufficient for present day library applications,…
Effective Instructional Practices in Juvenile Justice Facilities
ERIC Educational Resources Information Center
Mathur, Sarup R.; Schoenfeld, Naomi
2010-01-01
The majority of youths involved with the juvenile justice system struggle to make academic progress. This article reviews the characteristics of youths in these settings and highlights evidence-based instructional practices that are effective with struggling students, as well as practices that have been documented as successful in secure…
ERIC Educational Resources Information Center
McArdle, Gavin; Bertolotto, Michela
2012-01-01
Today, the Internet plays a major role in distributing learning material within third level education. Multiple online facilities provide access to educational resources. While early systems relied on webpages, which acted as repositories for learning material, nowadays sophisticated online applications manage and deliver learning resources.…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-29
... ethanol through a natural fermentation process from the definition of ``chemical process plants'' in the... through a natural fermentation process from the definition of ``chemical process plants'' in the major NSR... facilities producing ethanol by natural fermentation under the North American Industry Classification System...
Fire Safety. Managing School Facilities, Guide 6.
ERIC Educational Resources Information Center
Department for Education and Employment, London (England). Architects and Building Branch.
This booklet discusses how United Kingdom schools can manage fire safety and minimize the risk of fire. The guide examines what legislation school buildings must comply with and covers the major risks. It also describes training and evacuation procedures and provides guidance on fire precautions, alarm systems, fire fighting equipment, and escape…
THE CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ted Berglund; Jeffrey T. Ranney; Carol L. Babb
2001-07-01
The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. During this first quarter of 2001, shredding of the feed material and final feed conditioning were completed. Pilot facility hydrolysismore » production was completed to produce lignin for co-fire testing. During this quarter, TVA completed the washing and dewatering of the lignin material produced from the MSW hydrolysis. Seven drums of lignin material were washed to recover the acid and sugar from the lignin and provide an improved fuel for steam generation. Samples of both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation. After sample evaluation, EERC approved sending the material and all of the necessary fuel for testing was shipped to EERC. EERC has requested and will receive coal typical of the fuel to the TVA-Colbert boilers. This material will be used at EERC as baseline material and for mixing with the bio-fuel for combustion testing. EERC combustion testing of the bio based fuels is scheduled to begin in August of 2001. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system was completed. The cost estimate and the output and heat rate impacts will be used to determine a preliminary price for the exported steam. The preliminary steam price will be determined in the next quarter.« less
Dynamic Modeling and Evaluation of Recurring Infrastructure Maintenance Budget Determination Methods
2005-03-01
represent the annual M&R costs for the entire facility (Melvin, 1992). This method requires immense amounts of detailed data for each facility to be...and where facility and infrastructure maintenance must occur. Uzarski et al (1995) discuss that the data gathered produces a candidate list that can... facilities or an infrastructure plant. Government agencies like the DoD, major universities, and large corporations are the major players. Data
Space Station power system autonomy demonstration
NASA Technical Reports Server (NTRS)
Kish, James A.; Dolce, James L.; Weeks, David J.
1988-01-01
The Systems Autonomy Demonstration Program (SADP) represents NASA's major effort to demonstrate, through a series of complex ground experiments, the application and benefits of applying advanced automation technologies to the Space Station project. Lewis Research Center (LeRC) and Marshall Space Flight Center (MSFC) will first jointly develop an autonomous power system using existing Space Station testbed facilities at each center. The subsequent 1990 power-thermal demonstration will then involve the cooperative operation of the LeRC/MSFC power system with the Johnson Space Center (JSC's) thermal control and DMS/OMS testbed facilities. The testbeds and expert systems at each of the NASA centers will be interconnected via communication links. The appropriate knowledge-based technology will be developed for each testbed and applied to problems requiring intersystem cooperation. Primary emphasis will be focused on failure detection and classification, system reconfiguration, planning and scheduling of electrical power resources, and integration of knowledge-based and conventional control system software into the design and operation of Space Station testbeds.
Electronics systems test laboratory testing of shuttle communications systems
NASA Technical Reports Server (NTRS)
Stoker, C. J.; Bromley, L. K.
1985-01-01
Shuttle communications and tracking systems space to space and space to ground compatibility and performance evaluations are conducted in the NASA Johnson Space Center Electronics Systems Test Laboratory (ESTL). This evaluation is accomplished through systems verification/certification tests using orbiter communications hardware in conjunction with other shuttle communications and tracking external elements to evaluate end to end system compatibility and to verify/certify that overall system performance meets program requirements before manned flight usage. In this role, the ESTL serves as a multielement major ground test facility. The ESTL capability and program concept are discussed. The system test philosophy for the complex communications channels is described in terms of the major phases. Results of space to space and space to ground systems tests are presented. Several examples of the ESTL's unique capabilities to locate and help resolve potential problems are discussed in detail.
1975-12-01
139 APPENDIX A* BASIC CONCEPT OF MILITARY TECHNICAL CONTROL.142 6 APIENDIX Es TEST EQUIPMENI REQUIRED FOR lEASURF.4ENr OF 1AF’AMETE RS...Control ( SATEC ) Automatic Facilities heport Army Automated Quality Monitoring Reporting System (AQMPS) Army Autcmated Technical Control-Semi (ATC-Semi...technical control then beco.. es equipment status monitoring. All the major equipment in a system wculd have internal sensors with properly selected parameters
Pointing and control system design study for the space infrared telescope facility (SIRTF)
NASA Technical Reports Server (NTRS)
Lorell, K. R.; Aubrun, J. N.; Sridhar, B.; Cochran, R. W.
1984-01-01
The design and performance of pointing and control systems for two space infrared telescope facility vehicles were examined. The need for active compensation of image jitter using the secondary mirror or other optical elements was determined. In addition, a control system to allow the telescope to perform small angle slews, and to accomplish large angle slews at the rate of 15 deg per minute was designed. Both the 98 deg and the 28 deg inclination orbits were examined, and spacecraft designs were developed for each. The results indicate that active optical compensation of line-of-sight errors is not necessary if the system is allowed to settle for roughly ten seconds after a slew maneuver. The results are contingent on the assumption of rigid body dynamics, and a single structural mode between spacecraft and telescope. Helium slosh for a half full 4000 liter tank was analyzed, and did not represent a major control problem.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The objectives of the Ingham County Solar Project include: the demonstration of a major operational supplement to fossil fuels, thereby reducing the demand for non-renewable energy sources, demonstration of the economic and technical feasibility of solar systems as an important energy supplement over the expected life of the building, and to encourage Michigan industry to produce and incorporate solar systems in their own facility. The Ingham County solar system consists of approximately 10,000 square feet of solar collectors connected in a closed configuration loop. The primary loop solution is a mixture of water and propylene glycol which flows through themore » tube side of a heat exchanger connected to the primary storage tank. The heat energy which is supplied to the primary storage tank is subsequently utilized to increase the temperature of the laundry water, kitchen water, and domestic potable water.« less
Challenges and opportunities associated with waste management in India
Kumar, Sunil; Smith, Stephen R.; Fowler, Geoff; Velis, Costas; Kumar, S. Jyoti; Arya, Shashi; Rena; Kumar, Rakesh
2017-01-01
India faces major environmental challenges associated with waste generation and inadequate waste collection, transport, treatment and disposal. Current systems in India cannot cope with the volumes of waste generated by an increasing urban population, and this impacts on the environment and public health. The challenges and barriers are significant, but so are the opportunities. This paper reports on an international seminar on ‘Sustainable solid waste management for cities: opportunities in South Asian Association for Regional Cooperation (SAARC) countries’ organized by the Council of Scientific and Industrial Research-National Environmental Engineering Research Institute and the Royal Society. A priority is to move from reliance on waste dumps that offer no environmental protection, to waste management systems that retain useful resources within the economy. Waste segregation at source and use of specialized waste processing facilities to separate recyclable materials has a key role. Disposal of residual waste after extraction of material resources needs engineered landfill sites and/or investment in waste-to-energy facilities. The potential for energy generation from landfill via methane extraction or thermal treatment is a major opportunity, but a key barrier is the shortage of qualified engineers and environmental professionals with the experience to deliver improved waste management systems in India. PMID:28405362
Racial disparities in travel time to radiotherapy facilities in the Atlanta metropolitan area
Peipins, Lucy A.; Graham, Shannon; Young, Randall; Lewis, Brian; Flanagan, Barry
2018-01-01
Low-income women with breast cancer who rely on public transportation may have difficulty in completing recommended radiation therapy due to inadequate access to radiation facilities. Using a geographic information system (GIS) and network analysis we quantified spatial accessibility to radiation treatment facilities in the Atlanta, Georgia metropolitan area. We built a transportation network model that included all bus and rail routes and stops, system transfers and walk and wait times experienced by public transportation system travelers. We also built a private transportation network to model travel times by automobile. We calculated travel times to radiation therapy facilities via public and private transportation from a population-weighted center of each census tract located within the study area. We broadly grouped the tracts by low, medium and high household access to a private vehicle and by race. Facility service areas were created using the network model to map the extent of areal coverage at specified travel times (30, 45 and 60 min) for both public and private modes of transportation. The median public transportation travel time to the nearest radiotherapy facility was 56 min vs. approximately 8 min by private vehicle. We found that majority black census tracts had longer public transportation travel times than white tracts across all categories of vehicle access and that 39% of women in the study area had longer than 1 h of public transportation travel time to the nearest facility. In addition, service area analyses identified locations where the travel time barriers are the greatest. Spatial inaccessibility, especially for women who must use public transportation, is one of the barriers they face in receiving optimal treatment. PMID:23726213
Racial disparities in travel time to radiotherapy facilities in the Atlanta metropolitan area.
Peipins, Lucy A; Graham, Shannon; Young, Randall; Lewis, Brian; Flanagan, Barry
2013-07-01
Low-income women with breast cancer who rely on public transportation may have difficulty in completing recommended radiation therapy due to inadequate access to radiation facilities. Using a geographic information system (GIS) and network analysis we quantified spatial accessibility to radiation treatment facilities in the Atlanta, Georgia metropolitan area. We built a transportation network model that included all bus and rail routes and stops, system transfers and walk and wait times experienced by public transportation system travelers. We also built a private transportation network to model travel times by automobile. We calculated travel times to radiation therapy facilities via public and private transportation from a population-weighted center of each census tract located within the study area. We broadly grouped the tracts by low, medium and high household access to a private vehicle and by race. Facility service areas were created using the network model to map the extent of areal coverage at specified travel times (30, 45 and 60 min) for both public and private modes of transportation. The median public transportation travel time to the nearest radiotherapy facility was 56 min vs. approximately 8 min by private vehicle. We found that majority black census tracts had longer public transportation travel times than white tracts across all categories of vehicle access and that 39% of women in the study area had longer than 1 h of public transportation travel time to the nearest facility. In addition, service area analyses identified locations where the travel time barriers are the greatest. Spatial inaccessibility, especially for women who must use public transportation, is one of the barriers they face in receiving optimal treatment. Published by Elsevier Ltd.
Military Compensation: Past, Present and Future. Volume 1. Executive Summary.
1976-01-01
Chapter 3 provides an overview of the current military compen- sation system -- i.e., the military pay and allowances system. The major subsystems to...research efforts produced processes for control of shrinkageof wool fabrics. In the US textile industry, wooliteis are nowtreated by these processes...led to development of .4,4continuous dyeing. Ilodern dyeing facilities of large textile • actories throughout the world trace their basic technology
Renovation of the hot press in the Plutonium Experimental Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Congdon, J.W.; Nelson, G.H.
1990-03-05
The Plutonium Experimental Facility (PEF) will be used to develop a new fuel pellet fabrication process and to evaluate equipment upgrades. The facility was used from 1978 until 1982 to optimize the parameters for fuel pellet production using a process which was developed at Los Alamos National Laboratory. The PEF was shutdown and essentially abandoned until mid-1987 when the facility renovations were initiated by the Actinide Technology Section (ATS) of SRL. A major portion of the renovation work was related to the restart of the hot press system. This report describes the renovations and modifications which were required to restartmore » the PEF hot press. The primary purpose of documenting this work is to help provide a basis for Separations to determine the best method of renovating the hot press in the Plutonium Fuel Fabrication (PuFF) facility. This report also includes several SRL recommendations concerning the renovation and modification of the PuFF hot press. 4 refs.« less
Gautham, Meenakshi; Spicer, Neil; Subharwal, Manish; Gupta, Sanjay; Srivastava, Aradhana; Bhattacharyya, Sanghita; Avan, Bilal Iqbal; Schellenberg, Joanna
2016-01-01
Health information systems are an important planning and monitoring tool for public health services, but may lack information from the private health sector. In this fourth article in a series on district decision-making for health, we assessed the extent of maternal, newborn and child health (MNCH)-related data sharing between the private and public sectors in two districts of Uttar Pradesh, India; analysed barriers to data sharing; and identified key inputs required for data sharing. Between March 2013 and August 2014, we conducted 74 key informant interviews at national, state and district levels. Respondents were stakeholders from national, state and district health departments, professional associations, non-governmental programmes and private commercial health facilities with 3–200 beds. Qualitative data were analysed using a framework based on a priori and emerging themes. Private facilities registered for ultrasounds and abortions submitted standardized records on these services, which is compulsory under Indian laws. Data sharing for other services was weak, but most facilities maintained basic records related to institutional deliveries and newborns. Public health facilities in blocks collected these data from a few private facilities using different methods. The major barriers to data sharing included the public sector’s non-standardized data collection and utilization systems for MNCH and lack of communication and follow up with private facilities. Private facilities feared information disclosure and the additional burden of reporting, but were willing to share data if asked officially, provided the process was simple and they were assured of confidentiality. Unregistered facilities, managed by providers without a biomedical qualification, also conducted institutional deliveries, but were outside any reporting loops. Our findings suggest that even without legislation, the public sector could set up an effective MNCH data sharing strategy with private registered facilities by developing a standardized and simple system with consistent communication and follow up. PMID:27591205
B-1 and B-3 Test Stands at NASA’s Plum Brook Station
1966-09-21
Operation of the High Energy Rocket Engine Research Facility (B-1), left, and Nuclear Rocket Dynamics and Control Facility (B-3) at the National Aeronautics and Space Administration’s (NASA) Plum Brook Station in Sandusky, Ohio. The test stands were constructed in the early 1960s to test full-scale liquid hydrogen fuel systems in simulated altitude conditions. Over the next decade each stand was used for two major series of liquid hydrogen rocket tests: the Nuclear Engine for Rocket Vehicle Application (NERVA) and the Centaur second-stage rocket program. The different components of these rocket engines could be studied under flight conditions and adjusted without having to fire the engine. Once the preliminary studies were complete, the entire engine could be fired in larger facilities. The test stands were vertical towers with cryogenic fuel and steam ejector systems. B-1 was 135 feet tall, and B-3 was 210 feet tall. Each test stand had several levels, a test section, and ground floor shop areas. The test stands relied on an array of support buildings to conduct their tests, including a control building, steam exhaust system, and fuel storage and pumping facilities. A large steam-powered altitude exhaust system reduced the pressure at the exhaust nozzle exit of each test stand. This allowed B-1 and B-3 to test turbopump performance in conditions that matched the altitudes of space.
Ground test challenges in the development of the Space Shuttle orbiter auxiliary power unit
NASA Technical Reports Server (NTRS)
Chaffee, N. H.; Lance, R. J.; Weary, D. P.
1984-01-01
A conventional aircraft hydraulic system design approach was selected to provide fluid power for the Space Shuttle Orbiter. Developing the power unit, known as the Auxiliary Power Unit (APU), to drive the hydraulic pumps presented a major technological challenge. A small, high speed turbine drive unit powered by catalytically decomposed hydrazine and operating in the pulse mode was selected to meet the requirement. Because of limitations of vendor test facilities, significant portions of the development, flight qualification, and postflight anomaly testing of the Orbiter APU were accomplished at the Johnson Space Center (JSC) test facilities. This paper discusses the unique requirements of attitude, gravity forces, pressure profiles, and thermal environments which had to be satisfied by the APU, and presents the unique test facility and simulation techniques employed to meet the ground test requirements. In particular, the development of the zero-g lubrication system, the development of necessary APU thermal control techniques, the accomplishment of integrated systems tests, and the postflight investigation of the APU lube oil cooler behavior are discussed.
Spontaneous Raman Scattering (SRS) System for Calibrating High-Pressure Flames Became Operational
NASA Technical Reports Server (NTRS)
Nguyen, Quang-Viet
2003-01-01
A high-performance spontaneous Raman scattering (SRS) system for measuring quantitative species concentration and temperature in high-pressure flames is now operational. The system is located in Glenn s Engine Research Building. Raman scattering is perhaps the only optical diagnostic technique that permits the simultaneous (single-shot) measurement of all major species (N2, O2, CO2, H2O, CO, H2, and CH4) as well as temperature in combustion systems. The preliminary data acquired with this new system in a 20-atm hydrogen-air (H2-air) flame show excellent spectral coverage, good resolution, and a signal-to-noise ratio high enough for the data to serve as a calibration standard. This new SRS diagnostic system is used in conjunction with the newly developed High- Pressure Gaseous Burner facility (ref. 1). The main purpose of this diagnostic system and the High-Pressure Gaseous Burner facility is to acquire and establish a comprehensive Raman-scattering spectral database calibration standard for the combustion diagnostic community. A secondary purpose of the system is to provide actual measurements in standardized flames to validate computational combustion models. The High-Pressure Gaseous Burner facility and its associated SRS system will provide researchers throughout the world with new insights into flame conditions that simulate the environment inside the ultra-high-pressure-ratio combustion chambers of tomorrow s advanced aircraft engines.
NASA Astrophysics Data System (ADS)
Ramli, M. I.; Hanami, Z. A.; Aly, S. H.; Pasra, M.; Hustim, M.
2018-04-01
Motor vehicles have long been a source of pollution in many major cities in the world, including Indonesia. The increasing of the motor vehicle on the road leads to the rising of air pollution that exhausted by the vehicles as consequently. This research is intended to analyze the relationship between motorcycle emission and road facilities for each kind of road facilities in four different arterial road types. This study is quantitative research in which data collection is done directly in 4 types of road such as 2/1 UD, 4/1 UD, 4/2 D, and 6/2 UD in Makassar using motorcycle the Gas Analyzer Portable Measurement System and GPS emission test for speed tracking. The results are the emission tend to increase in road facilities where JS3TB (unsignalized junction) has the highest amount of CO and CO2 emission compared to other types.
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility conducts a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility is prepared to conduct a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility conducts a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility conducts a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
Shreay, Sanatan; Ma, Martin; McCluskey, Jill; Mittelhammer, Ron C; Gitlin, Matthew; Stephens, J Mark
2014-01-01
Objective To explore the relative efficiency of dialysis facilities in the United States and identify factors that are associated with efficiency in the production of dialysis treatments. Data Sources/Study Setting Medicare cost report data from 4,343 free-standing dialysis facilities in the United States that offered in-center hemodialysis in 2010. Study Design A cross-sectional, facility-level retrospective database analysis, utilizing data envelopment analysis (DEA) to estimate facility efficiency. Data Collection/Extraction Methods Treatment data and cost and labor inputs of dialysis treatments were obtained from 2010 Medicare Renal Cost Reports. Demographic data were obtained from the 2010 U.S. Census. Principal Findings Only 26.6 percent of facilities were technically efficient. Neither the intensity of market competition nor the profit status of the facility had a significant effect on efficiency. Facilities that were members of large chains were less likely to be efficient. Cost and labor savings due to changes in drug protocols had little effect on overall dialysis center efficiency. Conclusions The majority of free-standing dialysis facilities in the United States were functioning in a technically inefficient manner. As payment systems increasingly employ capitation and bundling provisions, these institutions will need to evaluate their efficiency to remain competitive. PMID:24237043
Reflections on curative health care in Nicaragua.
Slater, R G
1989-01-01
Improved health care in Nicaragua is a major priority of the Sandinista revolution; it has been pursued by major reforms of the national health care system, something few developing countries have attempted. In addition to its internationally recognized advances in public health, considerable progress has been made in health care delivery by expanding curative medical services through training more personnel and building more facilities to fulfill a commitment to free universal health coverage. The very uneven quality of medical care is the leading problem facing curative medicine now. Underlying factors include the difficulty of adequately training the greatly increased number of new physicians. Misdiagnosis and mismanagement continue to be major problems. The curative medical system is not well coordinated with the preventive sector. Recent innovations include initiation of a "medicina integral" residency, similar to family practice. Despite its inadequacies and the handicaps of war and poverty, the Nicaraguan curative medical system has made important progress. PMID:2705603
NASA Technical Reports Server (NTRS)
Mccllough, J. R.; Sharpe, A.; Doetsch, K. H.
1980-01-01
The SIMFAC has played a vital role in the design, development, and performance verification of the shuttle remote manipulator system (SRMS) to be installed in the space shuttle orbiter. The facility provides for realistic man-in-the-loop operation of the SRMS by an operator in the operator complex, a flightlike crew station patterned after the orbiter aft flight deck with all necessary man machine interface elements, including SRMS displays and controls and simulated out-of-the-window and CCTV scenes. The characteristics of the manipulator system, including arm and joint servo dynamics and control algorithms, are simulated by a comprehensive mathematical model within the simulation subsystem of the facility. Major studies carried out using SIMFAC include: SRMS parameter sensitivity evaluations; the development, evaluation, and verification of operating procedures; and malfunction simulation and analysis of malfunction performance. Among the most important and comprehensive man-in-the-loop simulations carried out to date on SIMFAC are those which support SRMS performance verification and certification when the SRMS is part of the integrated orbiter-manipulator system.
Prerelease Planning and Practices for Youth with Disabilities in Juvenile Detention
ERIC Educational Resources Information Center
Mathur, Sarup R.; Clark, Heather Griller
2013-01-01
Many youth in detention facilities come from vulnerable home environments where factors such as economic pressures, abuse, neglect, and parental incarceration are constantly operating within the family system. A vast majority of these youth have not had positive school experiences and many of them experience special needs and mental health issues.…
One of the major contributions of Greenhouse Gas (GHG) emissions from water resource recovery facilities results from the energy used by the pumping regime of the lift stations. This project demonstrated an energy-efficient control method of lift station system operation that uti...
A Preliminary Qualitative Evaluation of the Virginia Gold Quality Improvement Program
ERIC Educational Resources Information Center
Craver, Gerald A.; Burkett, Amy K.
2012-01-01
Certified nursing assistants (CNAs) perform an important role in the long-term care system because they provide the majority of paid care to nursing facility residents. Unfortunately, annual CNA turnover often exceeds 100 percent nationally. Many factors account for this, including stressful working conditions, low pay, and limited benefits. The…
School Facilities Funding: IDRA Special Bulletin.
ERIC Educational Resources Information Center
IDRA Special Bulletin, 1995
1995-01-01
This special bulletin examines the Texas Supreme Court's January 1995 final opinion in the Edgewood vs. Meno case, the latest in a series of rulings on the constitutionality of the Texas public school funding system. The first article summarizes the majority opinion, discusses the implications of the court's 5-4 ruling, and suggests that further…
Mpunga, Dieudonné; Lumbayi, J P; Dikamba, Nelly; Mwembo, Albert; Ali Mapatano, Mala; Wembodinga, Gilbert
2017-06-27
To determine the availability and quality of family planning services within health facilities throughout the Democratic Republic of the Congo (DRC). Data were collected for the cross-sectional study from April 2014 to June 2014 by the Ministry of Public Health. A total of 1,568 health facilities that reported data to the National Health Information System were selected by multistage random sampling in the 11 provinces of the DRC existing at that time. Data were collected through interviews, document review, and direct observation. Two dependent variables were measured: availability of family planning services (consisting of a room for services, staff assigned to family planning, and evidence of client use of family planning) and quality of family planning services (assessed as "high" if the facility had at least 1 trained staff member, family planning service delivery guidelines, at least 3 types of methods, and a sphygmomanometer, or "low" if the facility did not meet any of these 4 criteria). Pearson's chi-square test and odds ratios (ORs) were used to test for significant associations, using the alpha significance level of .05. We successfully surveyed 1,555 facilities (99.2%) of those included in the sample. One in every 3 facilities (33%) offered family planning services as assessed by the index of availability, of which 20% met all 4 criteria for providing high-quality services. Availability was greatest at the highest level of the health system (hospitals) and decreased incrementally with each health system level, with disparities between provinces and urban and rural areas. Facilities in urban areas were more likely than in rural areas to meet the standard for high-quality services ( P <.001). Public facilities were less likely than private facilities to have high-quality services ( P =.02). Among all 1,555 facilities surveyed, 14% had at least 3 types of methods available at the time of the survey; the most widely available methods were male condoms, combined oral contraceptive pills, and progestin-only injectable contraceptives. Availability and quality of family planning services in health facilities in the DRC remain low, with inequitable distribution of services throughout the country. To improve access to and use of family planning, efforts should focus on improving availability and quality at lower health system levels and in rural areas where the majority of the population lives. © Mpunga et al.
OPERATOR BURDEN IN METAL ADDITIVE MANUFACTURING
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elliott, Amy M; Love, Lonnie J
2016-01-01
Additive manufacturing (AM) is an emerging manufacturing process that creates usable machine parts via layer-by-layer joining of a stock material. With this layer-wise approach, high-performance geometries can be created which are impossible with traditional manufacturing methods. Metal AM technology has the potential to significantly reduce the manufacturing burden of developing custom hardware; however, a major consideration in choosing a metal AM system is the required amount of operator involvement (i.e., operator burden) in the manufacturing process. The operator burden not only determines the amount of operator training and specialization required but also the usability of the system in a facility.more » As operators of several metal AM processes, the Manufacturing Demonstration Facility (MDF) at Oak Ridge National Labs is uniquely poised to provide insight into requirements for operator involvement in each of the three major metal AM processes. The paper covers an overview of each of the three metal AM technologies, focusing on the burden on the operator to complete the build cycle, process the part for final use, and reset the AM equipment for future builds.« less
Computer-based nursing documentation in nursing homes: A feasibility study.
Yu, Ping; Qiu, Yiyu; Crookes, Patrick
2006-01-01
The burden of paper-based nursing documentation has led to increasing complaints and decreasing job satisfaction amongst aged-care workers in Australian nursing homes. The automation of nursing documentation has been identified as one of the possible strategies to address this issue. A major obstacle to the introduction of IT solutions, however, has been a prevailing doubt concerning the ability and/or the willingness of aged-care workers to accept such innovation. This research investigates the attitudes of aged-care workers towards adopting IT innovation. Questionnaire survey were conducted in 13 nursing homes around the Illawarra and Sydney regions in Australia. The survey found that an unexpected 89.3% of participants supported the strategy of introducing electronic nursing documentation systems into residential aged-care facilities. 94.3% of them would use such a system depending on circumstances. Despite a shortage of computers in the workplace, which is a major barrier, this research provides strong evidence that care workers in residential aged-care facilities are willing to accept electronic nursing documentation practice and the uptake of information technology in residential aged-care is feasible in Australia.
2004-02-25
KENNEDY SPACE CENTER, FLA. - On a tour of the Orbiter Processing Facility, Center Director Jim Kennedy (center) and Deputy Director Woodrow Whitlow Jr. (far left) look at the external tank door corrosion work being done on Endeavour. Next to Whitlow is Bruce Buckingham, assistant to the deputy director. Providing information, at right, are Orbiter Airframe Engineering ground area manager, and Tom Roberts, Airframe Engineering System specialist, both with United Space Alliance; and Joy Huff, with KSC Space Shuttle Processing. Endeavour is in its Orbiter Major Modification period, which began in December 2003.
2004-02-25
KENNEDY SPACE CENTER, FLA. - On a tour of the Orbiter Processing Facility, Center Director Jim Kennedy (center) and Deputy Director Woodrow Whitlow Jr. (far left) look at the external tank door corrosion work being done on Endeavour. Next to Whitlow is Bruce Buckingham, assistant to the deputy director. Providing information, at right, are Kathy Laufenberg, Orbiter Airframe Engineering ground area manager, and Tom Roberts, Airframe Engineering System specialist, both with United Space Alliance; and Joy Huff, with Space Shuttle Processing. Endeavour is in its Orbiter Major Modification period, which began in December 2003.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, A.E.; Tschanz, J.; Monarch, M.
1996-05-01
The Air Quality Utility Information System (AQUIS) is a database management system that operates under dBASE IV. It runs on an IBM-compatible personal computer (PC) with MS DOS 5.0 or later, 4 megabytes of memory, and 30 megabytes of disk space. AQUIS calculates emissions for both traditional and toxic pollutants and reports emissions in user-defined formats. The system was originally designed for use at 7 facilities of the Air Force Materiel Command, and now more than 50 facilities use it. Within the last two years, the system has been used in support of Title V permit applications at Department ofmore » Defense facilities. Growth in the user community, changes and additions to reference emission factor data, and changing regulatory requirements have demanded additions and enhancements to the system. These changes have ranged from adding or updating an emission factor to restructuring databases and adding new capabilities. Quality assurance (QA) procedures have been developed to ensure that emission calculations are correct even when databases are reconfigured and major changes in calculation procedures are implemented. This paper describes these QA and updating procedures. Some user facilities include light industrial operations associated with aircraft maintenance. These facilities have operations such as fiberglass and composite layup and plating operations for which standard emission factors are not available or are inadequate. In addition, generally applied procedures such as material balances may need special treatment to work in an automated environment, for example, in the use of oils and greases and when materials such as polyurethane paints react chemically during application. Some techniques used in these situations are highlighted here. To provide a framework for the main discussions, this paper begins with a description of AQUIS.« less
le Roux, David M; Myer, Landon; Nicol, Mark P; Zar, Heather J
2015-01-01
Background Pneumonia is the leading cause of childhood mortality and a major contributor to childhood morbidity, but accurate measurement of pneumonia incidence is challenging. We compared pneumonia incidence using a facility-based surveillance system to estimates from a cohort study conducted contemporaneously in the same community in Cape Town, South Africa. Methods A surveillance system was developed in six public sector primary care clinics and in a regional referral hospital, to detect childhood pneumonia cases. Nurses recorded all children presenting to facilities who met WHO case definitions of pneumonia, and hospital records were reviewed. Estimates of pneumonia incidence and severity were compared with incidence rates based on active surveillance in the Drakenstein Child Health Study. Results From June 2012 until September 2013, the surveillance system detected 306 pneumonia episodes in children under 1 year of age, an incidence of 0.20 episodes/child-year (e/cy) (95% CI 0.17 to 0.22 e/cy). The incidence in the cohort study from the same period was 0.27 e/cy (95% CI 0.23 to 0.32 e/cy). Pneumonia incidence in the surveillance system was almost 30% lower than in the birth cohort; incidence rate ratio 0.72 (95% CI 0.58 to 0.89). In the surveillance system, 18% were severe pneumonia cases, compared to 23% in the birth cohort, rate ratio 0.81 (95% CI 0.55 to 1.18). Conclusions In this setting, facility-based pneumonia surveillance detected fewer cases of pneumonia, and fewer severe cases, compared to the corresponding cohort study. Facility pneumonia surveillance using data collected by local healthcare workers provides a useful estimate of the epidemiology of childhood pneumonia but may underestimate incidence and severity. PMID:26685027
Safety Practices Followed in ISRO Launch Complex- An Overview
NASA Astrophysics Data System (ADS)
Krishnamurty, V.; Srivastava, V. K.; Ramesh, M.
2005-12-01
The spaceport of India, Satish Dhawan Space Centre (SDSC) SHAR of Indian Space Research Organisation (ISRO), is located at Sriharikota, a spindle shaped island on the east coast of southern India.SDSC SHAR has a unique combination of facilities, such as a solid propellant production plant, a rocket motor static test facility, launch complexes for different types of rockets, telemetry, telecommand, tracking, data acquisition and processing facilities and other support services.The Solid Propellant Space Booster Plant (SPROB) located at SDSC SHAR produces composite solid propellant for rocket motors of ISRO. The main ingredients of the propellant produced here are ammonium perchlorate (oxidizer), fine aluminium powder (fuel) and hydroxyl terminated polybutadiene (binder).SDSC SHAR has facilities for testing solid rocket motors, both at ambient conditions and at simulated high altitude conditions. Other test facilities for the environmental testing of rocket motors and their subsystems include Vibration, Shock, Constant Acceleration and Thermal / Humidity.SDSC SHAR has the necessary infrastructure for launching satellites into low earth orbit, polar orbit and geo-stationary transfer orbit. The launch complexes provide complete support for vehicle assembly, fuelling with both earth storable and cryogenic propellants, checkout and launch operations. Apart from these, it has facilities for launching sounding rockets for studying the Earth's upper atmosphere and for controlled reentry and recovery of ISRO's space capsule reentry missions.Safety plays a major role at SDSC SHAR right from the mission / facility design phase to post launch operations. This paper presents briefly the infrastructure available at SDSC SHAR of ISRO for launching sounding rockets, satellite launch vehicles, controlled reentry missions and the built in safety systems. The range safety methodology followed as a part of the real time mission monitoring is presented. The built in safety systems provided onboard the launch vehicle are automatic shut off the propulsion system based on real time mission performance and a passivation system incorporated in the orbit insertion stage are highlighted.
The interactive astronomical data analysis facility - image enhancement techniques to Comet Halley
NASA Astrophysics Data System (ADS)
Klinglesmith, D. A.
1981-10-01
PDP 11/40 computer is at the heart of a general purpose interactive data analysis facility designed to permit easy access to data in both visual imagery and graphic representations. The major components consist of: the 11/40 CPU and 256 K bytes of 16-bit memory; two TU10 tape drives; 20 million bytes of disk storage; three user terminals; and the COMTAL image processing display system. The application of image enhancement techniques to two sequences of photographs of Comet Halley taken in Egypt in 1910 provides evidence for eruptions from the comet's nucleus.
Wyoming's industrial siting permit process and environmental impact assessment
NASA Astrophysics Data System (ADS)
Hyman, Eric L.
1982-01-01
The problem of management of industrial residuals can be reduced through a rational system for siting and planning major industrial facilities. In the United States, Wyoming has moved in the direction of establishing a one-stop permitting system that provides important information for air and water quality planning and solid waste management with a minimum of regulatory overlap. This paper describes Wyoming's Industrial Development Information and Siting Act of 1975 and suggests ways in which the Wyoming permitting system can be improved and applied elsewhere.
NASA Technical Reports Server (NTRS)
Mildice, J.; Sundberg, R.
1987-01-01
The object of this program was to design, build, test, and deliver a high frequency (20 kHz) Power System Testbed which would electrically approximate a single, separable power channel of an IOC Space Station. That program is described, including the technical background, and the results are discussed showing that the major assumptions about the characteristics of this class of hardware (size, mass, efficiency, control, etc.) were substantially correct. This testbed equipment was completed and delivered and is being operated as part of the Space Station Power System Test Facility.
Maswime, T S; Buchmann, E
2017-10-31
A rising caesarean section rate and substandard peri-operative care are believed to be the main reasons for recent increases in maternal deaths from bleeding during and after caesarean section (BDACS) in South Africa (SA). The Donabedian model assumes that clinical outcomes are influenced by healthcare workers and the healthcare system. To evaluate near-miss cases from BDACS with regard to health system structure (resources and facilities) and process (patient care). A cross-sectional prospective study was conducted in greater Johannesburg, SA. Data of women who had near-miss-related BDACS were collected by means of ongoing surveillance at 13 public hospitals. The World Health Organization intervention criteria were used to identify near-miss cases. A comparison of structure and process between the healthcare facilities was conducted. Of 20 527 caesarean sections , there were 93 near misses and 7 maternal deaths from BDACS. Dominant risk factors for near misses were previous caesarean section (43.9%), anaemia (25.3%) and pregnancy-induced hypertension (28.6%). Eighteen women were transferred to higher levels of care, and 8 (44.4%) experienced transport delays of >1 hour. The caesarean section decision-to-incision interval (DII) was ≥60 minutes in 77 of 86 women, with an average interval of 4 hours. Structural deficiencies were frequently present in district hospitals, and there were serious delays in ambulance transfer and DIIs at all levels of care. The majority of the women had risk factors for BDACS. There were major ambulance delays and lack of facilities, mostly in district hospitals. All women required life-saving interventions, but could not access appropriate care timeously. Prevention and management of BDACS require a fully functional health system.
2009-11-19
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Kennedy Director Bob Cabana, left, congratulates, Eric Silagy, Florida Power & Light Company vice president and chief development officer, for his part in the construction of NASA's first large-scale solar power generation facility as Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation, looks on. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2009-11-19
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Kennedy Director Bob Cabana, left, congratulates Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation, for his part in the construction of NASA's first large-scale solar power generation facility as Eric Silagy, Florida Power & Light Company vice president and chief development officer, looks on. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
Recent advances and plans in processing and geocoding of SAR data at the DFD
NASA Technical Reports Server (NTRS)
Noack, W.
1993-01-01
Because of the needs of future projects like ENVISAT and the experiences made with the current operational ERS-1 facilities, a radical change in the synthetic aperture radar (SAR) processing scenarios can be predicted for the next years. At the German PAF several new developments were initialized which are driven mainly either by user needs or by system and operational constraints ('lessons learned'). At the end there will be a major simplification and uniformation of all used computer systems. Especially the following changes are likely to be implemented at the German PAF: transcription before archiving, processing of all standard products with high throughput directly at the receiving stations, processing of special 'high-valued' products at the PAF, usage of a single type of processor hardware, implementation of a large and fast on-line data archive, and improved and unified fast data network between the processing and archiving facilities. A short description of the current operational SAR facilities as well as the future implementations are given.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson, D. G.; Arent, D. J.; Johnson, L.
2006-06-01
This paper documents a probabilistic risk assessment of existing and alternative power supply systems at a large telecommunications office. The analysis characterizes the increase in the reliability of power supply through the use of two alternative power configurations. Failures in the power systems supporting major telecommunications service nodes are a main contributor to significant telecommunications outages. A logical approach to improving the robustness of telecommunication facilities is to increase the depth and breadth of technologies available to restore power during power outages. Distributed energy resources such as fuel cells and gas turbines could provide additional on-site electric power sources tomore » provide backup power, if batteries and diesel generators fail. The analysis is based on a hierarchical Bayesian approach and focuses on the failure probability associated with each of three possible facility configurations, along with assessment of the uncertainty or confidence level in the probability of failure. A risk-based characterization of final best configuration is presented.« less
CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ted Berglund; Jeffrey T. Ranney; Carol L. Babb
2002-04-01
The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility hydrolysis production has been completed to produce lignin for co-fire testing and the lignin fuel was washed and dewatered. Both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation and co-firing. EERC has received coal typical of the fuel to the TVA-Colbert boilers. This material was used atmore » EERC as baseline material and for mixing with the bio-fuel for combustion testing. All the combustion and fuel handling tests at EERC have been completed. During fuel preparation EERC reported no difficulties in fuel blending and handling. Preliminary co-fire test results indicate that the blending of lignin and bio-solids with the Colbert coal blend generally reduces NO{sub x} emissions, increases the reactivity of the coal, and increases the ash deposition rate on superheater surfaces. Deposits produced from the fuel blends, however, are more friable and hence easier to remove from tube surfaces relative to those produced from the baseline Colbert coal blend. The final co-fire testing report is being prepared at EERC and will be completed by the end of the second quarter of 2002. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for the steam supply system was completed. The cost estimate and output and heat rate impacts have been used to determine a preliminary price for the exported steam. TVA is further evaluating the impacts of adding lignin to the coal fuel blend and how the steam cost is impacted by proximity of the Masada biomass facility.« less
Data management in Oceanography at SOCIB
NASA Astrophysics Data System (ADS)
Joaquin, Tintoré; March, David; Lora, Sebastian; Sebastian, Kristian; Frontera, Biel; Gómara, Sonia; Pau Beltran, Joan
2014-05-01
SOCIB, the Balearic Islands Coastal Ocean Observing and Forecasting System (http://www.socib.es), is a Marine Research Infrastructure, a multiplatform distributed and integrated system, a facility of facilities that extends from the nearshore to the open sea and provides free, open and quality control data. SOCIB is a facility o facilities and has three major infrastructure components: (1) a distributed multiplatform observing system, (2) a numerical forecasting system, and (3) a data management and visualization system. We present the spatial data infrastructure and applications developed at SOCIB. One of the major goals of the SOCIB Data Centre is to provide users with a system to locate and download the data of interest (near real-time and delayed mode) and to visualize and manage the information. Following SOCIB principles, data need to be (1) discoverable and accessible, (2) freely available, and (3) interoperable and standardized. In consequence, SOCIB Data Centre Facility is implementing a general data management system to guarantee international standards, quality assurance and interoperability. The combination of different sources and types of information requires appropriate methods to ingest, catalogue, display, and distribute this information. SOCIB Data Centre is responsible for directing the different stages of data management, ranging from data acquisition to its distribution and visualization through web applications. The system implemented relies on open source solutions. In other words, the data life cycle relies in the following stages: • Acquisition: The data managed by SOCIB mostly come from its own observation platforms, numerical models or information generated from the activities in the SIAS Division. • Processing: Applications developed at SOCIB to deal with all collected platform data performing data calibration, derivation, quality control and standardization. • Archival: Storage in netCDF and spatial databases. • Distribution: Data web services using Thredds, Geoserver and RESTful own services. • Catalogue: Metadata is provided through the ncISO plugin in Thredds and Geonetwork. • Visualization: web and mobile applications to present SOCIB data to different user profiles. SOCIB data services and applications have been developed to provide response to science and society needs (eg. European initiatives such as Emodnet or Copernicus), by targeting different user profiles (eg. researchers, technicians, policy and decision makers, educators, students, and society in general). For example, SOCIB has developed applications to: 1) allow researchers and technicians to access oceanographic information; 2) provide decision support for oil spills response; 3) disseminate information about the coastal state for tourists and recreational users; 4) present coastal research in educational programs; and 5) offer easy and fast access to marine information through mobile devices. In conclusion, the organizational and conceptual structure of SOCIB's Data Centre and the components developed provide an example of marine information systems within the framework of new ocean observatories and/or marine research infrastructures.
National Airspace System Plan: Facilities, Equipment, Associated Development and Other Capital Needs
1988-06-01
services will reflect a yes include: better balance between trip frequency and cost than would be the case under a closely regulated 0 Having an operating...terminal system). 0 Improved traffic flow planning and manage- ment, resulting in a more balanced workload. 0 A major improvement and integration of the...The AAS supervisors and specialists to assist them in will include AERA I functions and facilitate balancing sector staffing levels, later
Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study, volume 2
NASA Technical Reports Server (NTRS)
1989-01-01
The Liquid Rocket Booster (LRB) Systems Definition Handbook presents the analyses and design data developed during the study. The Systems Definition Handbook (SDH) contains three major parts: the LRB vehicles definition; the Pressure-Fed Booster Test Bed (PFBTB) study results; and the ALS/LRB study results. Included in this volume are the results of all trade studies; final configurations with supporting rationale and analyses; technology assessments; long lead requirements for facilities, materials, components, and subsystems; operational requirements and scenarios; and safety, reliability, and environmental analyses.
Materials Research Capabilities
NASA Technical Reports Server (NTRS)
Stofan, Andrew J.
1986-01-01
Lewis Research Center, in partnership with U.S. industry and academia, has long been a major force in developing advanced aerospace propulsion and power systems. One key aspect that made many of these systems possible has been the availability of high-performance, reliable, and long-life materials. To assure a continuing flow of new materials and processing concepts, basic understanding to guide such innovation, and technological support for development of major NASA systems, Lewis has supported a strong in-house materials research activity. Our researchers have discovered new alloys, polymers, metallic composites, ceramics, coatings, processing techniques, etc., which are now also in use by U.S. industry. This brochure highlights selected past accomplishments of our materials research and technology staff. It also provides many examples of the facilities available with which we can conduct materials research. The nation is now beginning to consider integrating technology for high-performance supersonic/hypersonic aircraft, nuclear space power systems, a space station, and new research areas such as materials processing in space. As we proceed, I am confident that our materials research staff will continue to provide important contributions which will help our nation maintain a strong technology position in these areas of growing world competition. Lewis Research Center, in partnership with U.S. industry and academia, has long been a major force in developing advanced aerospace propulsion and power systems. One key aspect that made many of these systems possible has been the availability of high-performance, reliable, and long-life materials. To assure a continuing flow of new materials and processing concepts, basic understanding to guide such innovation, and technological support for development of major NASA systems, Lewis has supported a strong in-house materials research activity. Our researchers have discovered new alloys, polymers, metallic composites, ceramics, coatings, processing techniques, etc., which are now also in use by U.S. industry. This brochure highlights selected past accomplishments of our materials research and technology staff. It also provides many examples of the facilities available with which we can conduct materials research. The nation is now beginning to consider integrating technology for high-performance supersonic/hypersonic aircraft, nuclear space power systems, a space station, and new research areas such as materials processing in space.
Development scenario for laser fusion
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maniscalco, J.A.; Hovingh, J.; Buntzen, R.R.
1976-03-30
This scenario proposes establishment of test and engineering facilities to (1) investigate the technological problems associated with laser fusion, (2) demonstrate fissile fuel production, and (3) demonstrate competitive electrical power production. Such facilities would be major milestones along the road to a laser-fusion power economy. The relevant engineering and economic aspects of each of these research and development facilities are discussed. Pellet design and gain predictions corresponding to the most promising laser systems are presented for each plant. The results show that laser fusion has the potential to make a significant contribution to our energy needs. Beginning in the earlymore » 1990's, this new technology could be used to produce fissile fuel, and after the turn of the century it could be used to generate electrical power.« less
Major Facilities for Materials Research and Related Disciplines.
ERIC Educational Resources Information Center
National Academy of Sciences - National Research Council, Washington, DC. Commission on Physical Sciences, Mathematics, and Resources.
This report presents priorities for new facilities and new capabilities at existing facilities with initial costs of at least $5 million. The new facilities in order of priority are: (1) a 6 GeV synchrotron radiation facility; (2) an advanced steady state neutron facility; (3) a 1 to 2 GeV synchrotron radiation facility; and (4) a high intensity…
Calvello, Emilie J B; Tenner, Andrea G; Broccoli, Morgan C; Skog, Alexander P; Muck, Andrew E; Tupesis, Janis P; Brysiewicz, Petra; Teklu, Sisay; Wallis, Lee; Reynolds, Teri
2016-08-01
A major barrier to successful integration of acute care into health systems is the lack of consensus on the essential components of emergency care within resource-limited environments. The 2013 African Federation of Emergency Medicine Consensus Conference was convened to address the growing need for practical solutions to further implementation of emergency care in sub-Saharan Africa. Over 40 participants from 15 countries participated in the working group that focused on emergency care delivery at health facilities. Using the well-established approach developed in the WHO's Monitoring Emergency Obstetric Care, the workgroup identified the essential services delivered-signal functions-associated with each emergency care sentinel condition. Levels of emergency care were assigned based on the expected capacity of the facility to perform signal functions, and the necessary human, equipment and infrastructure resources identified. These consensus-based recommendations provide the foundation for objective facility capacity assessment in developing emergency health systems that can bolster strategic planning as well as facilitate monitoring and evaluation of service delivery. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/
NASA Technical Reports Server (NTRS)
Lee, Katharine K.; Davis, Thomas J.; Levin, Kerry M.; Rowe, Dennis W.
2001-01-01
The Traffic Management Advisor (TMA) is a decision-support tool for traffic managers and air traffic controllers that provides traffic flow visualization and other flow management tools. TMA creates an efficiently sequenced and safely spaced schedule for arrival traffic that meets but does not exceed specified airspace system constraints. TMA is being deployed at selected facilities throughout the National Airspace System in the US as part of the FAA's Free Flight Phase 1 program. TMA development and testing, and its current deployment, focuses on managing the arrival capacity for single major airports within single terminal areas and single en route centers. The next phase of development for this technology is the expansion of the TMA capability to complex facilities in which a terminal area or airport is fed by multiple en route centers, thus creating a multicenter TMA functionality. The focus of the multi-center TMA (McTMA) development is on the busy facilities in the Northeast comdor of the US. This paper describes the planning and development of McTMA and the challenges associated with adapting a successful traffic flow management tool for a very complex airspace.
VerifEYE: a real-time meat inspection system for the beef processing industry
NASA Astrophysics Data System (ADS)
Kocak, Donna M.; Caimi, Frank M.; Flick, Rick L.; Elharti, Abdelmoula
2003-02-01
Described is a real-time meat inspection system developed for the beef processing industry by eMerge Interactive. Designed to detect and localize trace amounts of contamination on cattle carcasses in the packing process, the system affords the beef industry an accurate, high speed, passive optical method of inspection. Using a method patented by United States Department of Agriculture and Iowa State University, the system takes advantage of fluorescing chlorophyll found in the animal's diet and therefore the digestive track to allow detection and imaging of contaminated areas that may harbor potentially dangerous microbial pathogens. Featuring real-time image processing and documentation of performance, the system can be easily integrated into a processing facility's Hazard Analysis and Critical Control Point quality assurance program. This paper describes the VerifEYE carcass inspection and removal verification system. Results indicating the feasibility of the method, as well as field data collected using a prototype system during four university trials conducted in 2001 are presented. Two successful demonstrations using the prototype system were held at a major U.S. meat processing facility in early 2002.
An Overview of the NASA Aeronautics Test Program Strategic Plan
NASA Technical Reports Server (NTRS)
Marshall, Timothy J.
2010-01-01
U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bagdon, M.J.; Martin, P.J.
1997-06-01
In 1994, Novus Engineering and EME Group began a project for the New York State Office of Mental Health (OMH) to maximize the use and benefit of energy management systems (EMS) installed at various large psychiatric hospitals throughout New York State. The project, which was funded and managed by the Dormitory Authority of the State of New York (DASNY), had three major objectives: (1) Maximize Energy Savings - Novus staff quickly learned that EMS systems as set up by contractors are far from optimal for generating energy savings. This part of the program revealed numerous opportunities for increased energy savings,more » such as: fine tuning proportional/integral/derivative (PID) loops to eliminate valve and damper hunting; adjusting temperature reset schedules to reduce energy consumption and provide more uniform temperature conditions throughout the facilities; and modifying equipment schedules. (2) Develop Monitoring Protocols - Large EMS systems are so complex that they require a systematic approach to daily, monthly and seasonal monitoring of building system conditions in order to locate system problems before they turn into trouble calls or equipment failures. In order to assist local facility staff in their monitoring efforts, Novus prepared user-friendly handbooks on each EMS. These included monitoring protocols tailored to each facility. (3) Provide Staff Training - When a new EMS is installed at a facility, it is frequently the maintenance staffs first exposure to a complex computerized system. Without proper training in what to look for, staff use of the EMS is generally very limited. With proper training, staff can be taught to take a pro-active approach to identify and solve problems before they get out of hand. The staff then realize that the EMS is a powerful preventative maintenance tool that can be used to make their work more effective and efficient. Case histories are presented.« less
Major design issues of molten carbonate fuel cell power generation unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, T.P.
1996-04-01
In addition to the stack, a fuel cell power generation unit requires fuel desulfurization and reforming, fuel and oxidant preheating, process heat removal, waste heat recovery, steam generation, oxidant supply, power conditioning, water supply and treatment, purge gas supply, instrument air supply, and system control. These support facilities add considerable cost and system complexity. Bechtel, as a system integrator of M-C Power`s molten carbonate fuel cell development team, has spent substantial effort to simplify and minimize these supporting facilities to meet cost and reliability goals for commercialization. Similiar to other fuels cells, MCFC faces design challenge of how to complymore » with codes and standards, achieve high efficiency and part load performance, and meanwhile minimize utility requirements, weight, plot area, and cost. However, MCFC has several unique design issues due to its high operating temperature, use of molten electrolyte, and the requirement of CO2 recycle.« less
Sood, Neeraj; Burger, Nicholas; Yoong, Joanne; Kopf, Dan; Spreng, Connor
2011-01-01
Background Health systems in Sub-Saharan Africa (SSA) are in urgent need of improvement. The private health sector is a major provider of care in the region and it will remain a significant actor in the future. Any efforts by SSA governments to improve health systems performance therefore has to account for the private health sector. Regional and international actors increasingly recognize importance of effectively engaging with the private health sector, and initiatives to improve engagement are underway in several countries. However, there is little systematic analysis of private health providers' view and experience with engagement. Methodology/Principal Findings In this study we surveyed private health facilities in Kenya and Ghana to understand the extent to which and how governments interact and engage with these facilities. The results suggest that government engagement with private health facilities is quite limited. The primary focus of this engagement is “command-and-control” type regulations to improve the quality of care. There is little attention paid to building the capacity of health care businesses through either technical or financial assistance. The vast majority of these facilities also receive no government assistance in meeting public health and social goals. Finally, government engagement with private pharmacies is often neglected and clinics receive a disproportionate share of government assistance. Conclusions/Significance Overall, our findings suggest that there may be considerable untapped potential for greater engagement with private health facilities—particularly pharmacies. Improving engagement will likely help governments with limited resources to better take advantage of the private sector capacity to meet access and equity objectives and to accelerate the achievement of the Millennium Development Goals. PMID:22132092
2003-09-05
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, one of two orbital maneuvering system (OMS) pods removed from Endeavour is lowered toward a transporter. The OMS pods are attached to the upper aft fuselage left and right sides. Fabricated primarily of graphite epoxy composite and aluminum, each pod is 21.8 feet long and 11.37 feet wide at its aft end and 8.41 feet wide at its forward end, with a surface area of approximately 435 square feet. Each pod houses the Reaction Control System propulsion components used for inflight maneuvering and is attached to the aft fuselage with 11 bolts. OMS pods are removed during Orbiter Major Modifications. Once removed, the OMS pods undergo in-depth structural inspections, system checks and the thrusters are changed out.
2003-09-05
KENNEDY SPACE CENTER, FLA. - Technicians in the Orbiter Processing Facility oversee removal of one of two orbital maneuvering system (OMS) pods from Endeavour. The OMS pods are attached to the upper aft fuselage left and right sides. Fabricated primarily of graphite epoxy composite and aluminum, each pod is 21.8 feet long and 11.37 feet wide at its aft end and 8.41 feet wide at its forward end, with a surface area of approximately 435 square feet. Each pod houses the Reaction Control System propulsion components used for inflight maneuvering and is attached to the aft fuselage with 11 bolts. OMS pods are removed during Orbiter Major Modifications. Once removed, the OMS pods undergo in-depth structural inspections, system checks and the thrusters are changed out.
2003-09-05
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility prepare to remove one of two orbital maneuvering system (OMS) pods from Endeavour. The OMS pods are attached to the upper aft fuselage left and right sides. Fabricated primarily of graphite epoxy composite and aluminum, each pod is 21.8 feet long and 11.37 feet wide at its aft end and 8.41 feet wide at its forward end, with a surface area of approximately 435 square feet. Each pod houses the Reaction Control System propulsion components used for inflight maneuvering and is attached to the aft fuselage with 11 bolts. OMS pods are removed during Orbiter Major Modifications. Once removed, the OMS pods undergo in-depth structural inspections, system checks and the thrusters are changed out.
2003-09-05
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, one of two orbital maneuvering system (OMS) pods removed from Endeavour is suspended overhead. The OMS pods are attached to the upper aft fuselage left and right sides. Fabricated primarily of graphite epoxy composite and aluminum, each pod is 21.8 feet long and 11.37 feet wide at its aft end and 8.41 feet wide at its forward end, with a surface area of approximately 435 square feet. Each pod houses the Reaction Control System propulsion components used for inflight maneuvering and is attached to the aft fuselage with 11 bolts. OMS pods are removed during Orbiter Major Modifications. Once removed, the OMS pods undergo in-depth structural inspections, system checks and the thrusters are changed out.
2003-09-05
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, one of two orbital maneuvering system (OMS) pods removed from Endeavour is lowered onto a transporter. The OMS pods are attached to the upper aft fuselage left and right sides. Fabricated primarily of graphite epoxy composite and aluminum, each pod is 21.8 feet long and 11.37 feet wide at its aft end and 8.41 feet wide at its forward end, with a surface area of approximately 435 square feet. Each pod houses the Reaction Control System propulsion components used for inflight maneuvering and is attached to the aft fuselage with 11 bolts. OMS pods are removed during Orbiter Major Modifications. Once removed, the OMS pods undergo in-depth structural inspections, system checks and the thrusters are changed out.
PSG-EXPERT. An expert system for the diagnosis of sleep disorders.
Fred, A; Filipe, J; Partinen, M; Paiva, T
2000-01-01
This paper describes PSG-EXPERT, an expert system in the domain of sleep disorders exploring polysomnographic data. The developed software tool is addressed from two points of view: (1)--as an integrated environment for the development of diagnosis-oriented expert systems; (2)--as an auxiliary diagnosis tool in the particular domain of sleep disorders. Developed over a Windows platform, this software tool extends one of the most popular shells--CLIPS (C Language Integrated Production System) with the following features: backward chaining engine; graph-based explanation facilities; knowledge editor including a fuzzy fact editor and a rules editor, with facts-rules integrity checking; belief revision mechanism; built-in case generator and validation module. It therefore provides graphical support for knowledge acquisition, edition, explanation and validation. From an application domain point of view, PSG-Expert is an auxiliary diagnosis system for sleep disorders based on polysomnographic data, that aims at assisting the medical expert in his diagnosis task by providing automatic analysis of polysomnographic data, summarising the results of this analysis in terms of a report of major findings and possible diagnosis consistent with the polysomnographic data. Sleep disorders classification follows the International Classification of Sleep Disorders. Major features of the system include: browsing on patients data records; structured navigation on Sleep Disorders descriptions according to ASDA definitions; internet links to related pages; diagnosis consistent with polysomnographic data; graphical user-interface including graph-based explanatory facilities; uncertainty modelling and belief revision; production of reports; connection to remote databases.
Capturing & Reusing Air Handler Condensate without Digging up the Campus
ERIC Educational Resources Information Center
Pruitt, Olen L.; Guccione, Patrick D.
2013-01-01
The University of Alabama at Birmingham (UAB) has experienced rapid growth in the last decade. In addition to educating over 17,000 students annually, UAB is a major research facility and academic healthcare center. Due to growth and expansion, UAB requires more and more water to sustain operations. The central chilled water system serves over…
CERN experience and strategy for the maintenance of cryogenic plants and distribution systems
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.
2015-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. After several years of exploitation of a wide range of cryogenic installations and in particular following the last two years major shutdown to maintain and consolidate the LHC machine, we have analysed and reviewed the maintenance activities to implement an efficient and reliable exploitation of the installations. We report the results, statistics and lessons learned on the maintenance activities performed and in particular the required consolidations and major overhauling, the organization, management and methodologies implemented.
2012-01-01
Background Effective malaria case-management based on artemisinin-based combination therapy (ACT) and parasitological diagnosis is a major pillar within the 2007-2012 National Malaria Strategic Plan in the Sudan. Three years after the launch of the strategy a health facility survey was undertaken to evaluate case-management practices and readiness of the health facilities and health workers to implement a new malaria case-management strategy. Methods A cross-sectional, cluster sample survey was undertaken at public health facilities in 15 states of Sudan. Data were collected using quality-of-care assessment methods. The main outcomes were the proportions of facilities with ACTs and malaria diagnostics; proportions of health workers exposed to malaria related health systems support activities; and composite and individual indicators of case-management practices for febrile outpatients stratified by age, availability of ACTs and diagnostics, use of malaria diagnostics, and test result. Results We evaluated 244 facilities, 294 health workers and 1,643 consultations for febrile outpatients (425 < 5 years and 1,218 ≥ 5 years). Health facility and health worker readiness was variable: chloroquine was available at only 5% of facilities, 73% stocked recommended artesunate and sulfadoxine/pyrimethamine (AS+SP), 51% had the capacity to perform parasitological diagnosis, 53% of health workers had received in-service training on ACTs, 24% were trained in the use of malaria Rapid Diagnostic Tests, and 19% had received a supervisory visit including malaria case-management. At all health facilities 46% of febrile patients were parasitologically tested and 35% of patients were both, tested and treated according to test result. At facilities where AS+SP and malaria diagnostics were available 66% of febrile patients were tested and 51% were both, tested and treated according to test result. Among test positive patients 64% were treated with AS+SP but 24% were treated with artemether monotherapy. Among test negative patients only 17% of patients were treated for malaria. The majority of ACT dispensing and counseling practices were suboptimal. Conclusions Five years following change of the policy from chloroquine to ACTs and 3 years before the end of the new malaria strategic plan chloroquine was successfully phased out from public facilities in Sudan, however, an important gap remained in the availability of ACTs, diagnostic capacities and coverage with malaria case-management activities. The national scale-up of diagnostics, using the findings of this survey as well as future qualitative research, should present an opportunity not only to expand existing testing capacities but also to implement effective support interventions to bridge the health systems gaps and support corrective case-management measures, including the discontinuation of artemether monotherapy treatment. PMID:22221821
Code of Federal Regulations, 2014 CFR
2014-07-01
... machine or a vending facility on the same premises as a vending facility operated by a blind vendor, except that vending machines or vending facilities operated in areas serving employees the majority of... time required to patronize the vending facility) to the vending facility operated by a blind vendor...
Code of Federal Regulations, 2013 CFR
2013-07-01
... machine or a vending facility on the same premises as a vending facility operated by a blind vendor, except that vending machines or vending facilities operated in areas serving employees the majority of... time required to patronize the vending facility) to the vending facility operated by a blind vendor...
Code of Federal Regulations, 2012 CFR
2012-07-01
... machine or a vending facility on the same premises as a vending facility operated by a blind vendor, except that vending machines or vending facilities operated in areas serving employees the majority of... time required to patronize the vending facility) to the vending facility operated by a blind vendor...
NASA Technical Reports Server (NTRS)
Sass, J. P.; Raines, N. G.; Ryan, H. M.
2004-01-01
The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is part of NASA's Next Generation Launch Technology (NGLT) program, which seeks to provide safe, dependable, cost-cutting technologies for future space launch systems. The project also is part of the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today s state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The intended full flow engine cycle is a key component in achieving all of the aforementioned goals. The IPD Program recently achieved a major milestone with the successful completion of the IPD Oxidizer Turbopump (OTP) hot-fire test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in June 2003. A total of nine IPD Workhorse Preburner tests were completed, and subsequently 12 IPD OTP hot-fire tests were completed. The next phase of development involves IPD integrated engine system testing also at the NASA SSC E-1 test facility scheduled to begin in late 2004. Following an overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and testing of the IPD Workhorse Preburner and the IPD Oxidizer Turbopump. In addition, some of the facility challenges encountered during the test project shall be addressed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Underhill, Gary K.; Carlson, Ronald A.; Clendinning, William A.
1976-01-01
Econimic analysis, next to technical analysis, has traditionally constituted the major decision-making tool of the capitalist economic system. As lon as capitalism survives, this will remain to be the case. However, during the current period of increasing scarcity and cost of energy -- a period accompanied by higher than normal inflation rates -- a proposed project may appear attractive and economic when, in fact, its demands on energy resources are extraordinarily high. Such a conclusion could well be the case when the major energy expenditure in construction or operation is directed toward a fuel, the price of which is heldmore » unusually low by legal regulation. Net energetics analysis, as applied to energy generation facilities, is a method for determining the total amount of energy, IE, required to construct, operate, and maintain the energy generation facility compared to the total energy, TE, generated (or converted) throughout the facility's lifetime. Fuel consumed by the facility as direct input to the conversion or utiliztion process is not considered a debit while energy generated is not considered a credit in the calculation of the construction, operation, and maintenance energy account, IE. Energy required to run equipment auxiliary to the conversion process is, on the other hand, considered a debit to IE. The latter considerations apply to the production, processing, and transport of fuel but not to the energy content of the fuel itself.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wolfe, M.H.
1994-12-01
This presentation is a proposal made in the context of the evolving plans for power system interconnection in the Mashreq Arab countries of the Middle East, including studies completed for the Gulf States Interconnection along the Arabian Gulf from Kuwait to Oman. It also introduces the possibility of eventual interconnection of these systems with a major HVDC interconnection between the Inga hydropower source in Zaire and Egypt via an energy exchange center located at El Arish on Sinai. As realization of the Inga hydropower development will require many years to accomplish and as current plans for interconnection in the Mashreqmore » Arab countries are proceeding, it is thought that introduction of the possibility for eventual inter-regional interconnection between Africa and the Middle East should be considered within a time-frame that would encompass a dual-purpose aim beginning with the establishment of a solar equipment manufacturing facility to accentuate solar energy conversion for desalination and hydrogen production within the region. If this facility were located in convenient proximity to major nodes of the interconnected systems of the region, then it ultimately would be both a solar equipment manufacturing and energy exchange (SEMEX) center.« less
Potential of Cognitive Computing and Cognitive Systems
NASA Astrophysics Data System (ADS)
Noor, Ahmed K.
2015-01-01
Cognitive computing and cognitive technologies are game changers for future engineering systems, as well as for engineering practice and training. They are major drivers for knowledge automation work, and the creation of cognitive products with higher levels of intelligence than current smart products. This paper gives a brief review of cognitive computing and some of the cognitive engineering systems activities. The potential of cognitive technologies is outlined, along with a brief description of future cognitive environments, incorporating cognitive assistants - specialized proactive intelligent software agents designed to follow and interact with humans and other cognitive assistants across the environments. The cognitive assistants engage, individually or collectively, with humans through a combination of adaptive multimodal interfaces, and advanced visualization and navigation techniques. The realization of future cognitive environments requires the development of a cognitive innovation ecosystem for the engineering workforce. The continuously expanding major components of the ecosystem include integrated knowledge discovery and exploitation facilities (incorporating predictive and prescriptive big data analytics); novel cognitive modeling and visual simulation facilities; cognitive multimodal interfaces; and cognitive mobile and wearable devices. The ecosystem will provide timely, engaging, personalized / collaborative, learning and effective decision making. It will stimulate creativity and innovation, and prepare the participants to work in future cognitive enterprises and develop new cognitive products of increasing complexity. http://www.aee.odu.edu/cognitivecomp
Facilities for US Radioastronomy.
ERIC Educational Resources Information Center
Thaddeus, Patrick
1982-01-01
Discusses major developments in radioastronomy since 1945. Topics include proposed facilities, very-long-baseline interferometric array, millimeter-wave telescope, submillimeter-wave telescope, and funding for radioastronomy facilities and projects. (JN)
NASA directory of observation station locations, volume 2
NASA Technical Reports Server (NTRS)
1971-01-01
The directory documents geodetic information for NASA tracking stations and observation stations in the NASA Geodetic Satellites Program, including stations participating in the National Geodetic Satellite Program. Station positions of these facilities are given on local or preferred major datums, and on the Modified Mercury Datum 1968. A geodetic data sheet is provided for each station, giving the position of the station and describing briefly how it was established. Geodetic positions and geocentric coordinates of these stations are tabulated on local or major geodetic datums, and on selected world geodetic systems when available information permits.
NASA Technical Reports Server (NTRS)
1977-01-01
The panel reviewed the following areas of major significance for the Approach and Landing Test program: mission planning and crew training, flight-readiness of the Carrier Aircraft and the Orbiter, including its flight control and avionics system, facilities, and communications and ground support equipment. The management system for risk assessment was investigated. The Orbital Flight Test Program was also reviewed. Observations and recommendations are presented.
Evaluation of introduction scenarios for a broadband access network
NASA Astrophysics Data System (ADS)
Bocker, Geert-Jan; Cuthbert, Laurie; Gobbi, Roberta; Inch, Robert; Sara, Lini
1995-02-01
The provision of broadband services at a reasonable cost to residential and small business customers is one of the major challenges facing operators. The introduction of cost-effective systems considering the existing infrastructure is an important study. Within the RACE project 2024 Broadband Access Facilities, the economic and evolution aspects of different introduction scenarios of a broadband access system suitable for providing these services are investigated. This paper presents the final results of this study.
Westinghouse Cementation Facility of Solid Waste Treatment System - 13503
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jacobs, Torsten; Aign, Joerg
2013-07-01
During NPP operation, several waste streams are generated, caused by different technical and physical processes. Besides others, liquid waste represents one of the major types of waste. Depending on national regulation for storage and disposal of radioactive waste, solidification can be one specific requirement. To accommodate the global request for waste treatment systems Westinghouse developed several specific treatment processes for the different types of waste. In the period of 2006 to 2008 Westinghouse awarded several contracts for the design and delivery of waste treatment systems related to the latest CPR-1000 nuclear power plants. One of these contracts contains the deliverymore » of four Cementation Facilities for waste treatment, s.c. 'Follow on Cementations' dedicated to three locations, HongYanHe, NingDe and YangJiang, of new CPR-1000 nuclear power stations in the People's Republic of China. Previously, Westinghouse delivered a similar cementation facility to the CPR-1000 plant LingAo II, in Daya Bay, PR China. This plant already passed the hot functioning tests successfully in June 2012 and is now ready and released for regular operation. The 'Follow on plants' are designed to package three 'typical' kind of radioactive waste: evaporator concentrates, spent resins and filter cartridges. The purpose of this paper is to provide an overview on the Westinghouse experience to design and execution of cementation facilities. (authors)« less
Flessa, Steffen; Kouyaté, Bocar
2006-09-01
To present first findings of a cost-of-illness (COI) information system implemented in Nouna health district, Burkina Faso. The entire project will include household and provider tangible COI, whereas this article concentrates on the development of a provider cost information system in rural first-line health facilities. Special forms and reports are prepared to routinely collect capital and recurrent costs of first-line facilities. Inventory lists are designed, and buildings and equipment are assessed by engineers. Total, fixed, variable and average costs are calculated for 15 rural health centres with five cost centres: general outpatient consultation, ambulatory nursing care, deliveries, immunization and other services (neonatal consultation, child care and family planning). In 2003, the average costs per service unit were 1.34 US$ for a general consultation, 0.51 US$ for ambulatory nursing care, 6.73 US$ per delivery, 3.64 US$ per vaccination and 1.11 US$ per service unit of other care. On average, a health centre consumes 29,900 US$ per year for a catchment population of 10,000 inhabitants. The major share of costs is fixed and does not depend on the workload of the health centre. Consequently, the costs of first-line facilities will hardly increase if the demand for health services rises. These findings can be used to improve the health financing in Nouna health district, Burkina Faso.
Surveillance for unattended gas compressor stations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stastny, F.J.
1974-06-01
Surveillance devices in unattended compressor stations include those which detect trespassing by unauthorized personnel and those which protect the major operating equipment from damage and/or self-destruction. The latter monitor the critical operating parameters of major equipment and shut down the equipment when these parameters are exceeded; a table presents a function monitor and control list for such devices. Detection and apprehension of unauthorized personnel is a subject of increasing importance to guarantee station operability for reliable service and yet minimize staff personnel. An effective intrusion-detection system must (1) pinpoint the location and indicate the nature of the intrusion and (2)more » detect and respond rapidly to give security personnel a reasonable probability of apprehending or deterring the intruder before damage is done. The 2nd requirement is most difficult to satisfy when the facility is in a remote location, as is usually the case. Some of the parameters to consider in selecting an intrusion-detection system include concealment, legality, active vs. passive detector, back-up power, weather conditions, reliability, maintenance, discrimination, and compromising by intruders. Types of detectors include photo cell, infrared and radio frequency, audio,vibration, taut wire, circuit continuity, radar, and closed-circuit TV. The numerous types of devices and systems available provide sufficient diversity to enable a company to select a single device or a hybrid system which would incorporate several different devices for protecting unattended facilities.« less
Design strategies for the International Space University's variable gravity research facility
NASA Technical Reports Server (NTRS)
Bailey, Sheila G.; Chiaramonte, Francis P.; Davidian, Kenneth J.
1990-01-01
A variable gravity research facility named 'Newton' was designed by 58 students from 13 countries at the International Space University's 1989 summer session at the Universite Louis Pasteur, Strasbourge, France. The project was comprehensive in scope, including a political and legal foundation for international cooperation, development and financing; technical, science and engineering issues; architectural design; plausible schedules; and operations, crew issues and maintenance. Since log-term exposure to zero gravity is known to be harmful to the human body, the main goal was to design a unique variable gravity research facility which would find a practical solution to this problem, permitting a manned mission to Mars. The facility would not duplicate other space-based facilities and would provide the flexibility for examining a number of gravity levels, including lunar and Martian gravities. Major design alternatives included a truss versus a tether based system which also involved the question of docking while spinning or despinning to dock. These design issues are described. The relative advantages or disadvantages are discussed, including comments on the necessary research and technology development required for each.
Martin, Derek; Cockell, Charles S
2015-02-01
Investigations of other planetary bodies, including Mars and icy moons such as Enceladus and Europa, show that they may have hosted aqueous environments in the past and may do so even today. Therefore, a major challenge in astrobiology is to build facilities that will allow us to study the geochemistry and habitability of these extraterrestrial environments. Here, we describe a simulation facility (PELS: Planetary Environmental Liquid Simulator) with the capability for liquid input and output that allows for the study of such environments. The facility, containing six separate sample vessels, allows for statistical replication of samples. Control of pressure, gas composition, UV irradiation conditions, and temperature allows for the precise replication of aqueous conditions, including subzero brines under martian atmospheric conditions. A sample acquisition system allows for the collection of both liquid and solid samples from within the chamber without breaking the atmospheric conditions, enabling detailed studies of the geochemical evolution and habitability of past and present extraterrestrial environments. The facility we describe represents a new frontier in planetary simulation-continuous flow-through simulation of extraterrestrial aqueous environments.
Requirements management for Gemini Observatory: a small organization with big development projects
NASA Astrophysics Data System (ADS)
Close, Madeline; Serio, Andrew; Cordova, Martin; Hardie, Kayla
2016-08-01
Gemini Observatory is an astronomical observatory operating two premier 8m-class telescopes, one in each hemisphere. As an operational facility, a majority of Gemini's resources are spent on operations however the observatory undertakes major development projects as well. Current projects include new facility science instruments, an operational paradigm shift to full remote operations, and new operations tools for planning, configuration and change control. Three years ago, Gemini determined that a specialized requirements management tool was needed. Over the next year, the Gemini Systems Engineering Group investigated several tools, selected one for a trial period and configured it for use. Configuration activities including definition of systems engineering processes, development of a requirements framework, and assignment of project roles to tool roles. Test projects were implemented in the tool. At the conclusion of the trial, the group determined that the Gemini could meet its requirements management needs without use of a specialized requirements management tool, and the group identified a number of lessons learned which are described in the last major section of this paper. These lessons learned include how to conduct an organizational needs analysis prior to pursuing a tool; caveats concerning tool criteria and the selection process; the prerequisites and sequence of activities necessary to achieve an optimum configuration of the tool; the need for adequate staff resources and staff training; and a special note regarding organizations in transition and archiving of requirements.
[Security Management in Clinical Laboratory Departments and Facilities: Current Status and Issues].
Ishida, Haku; Nakamura, Junji; Yoshida, Hiroshi; Koike, Masaru; Inoue, Yuji
2014-11-01
We conducted a questionnaire survey regarding the current activities for protecting patients' privacy and the security of information systems (IS) related to the clinical laboratory departments of university hospitals, certified training facilities for clinical laboratories, and general hospitals in Yamaguchi Prefecture. The response rate was 47% from 215 medical institutions, including three commercial clinical laboratory centers. The results showed that there were some differences in management activities among facilities with respect to continuing education, the documentation or regulation of operational management for paper records, electronic information, remaining samples, genetic testing, and laboratory information for secondary use. They were suggested to be caused by differences in functions between university and general hospitals, differences in the scale of hospitals, or whether or not hospitals have received accreditation or ISO 15189. Regarding the IS, although the majority of facilities had sufficiently employed the access control to IS, there was some room for improvement in the management of special cases such as VIPs and patients with HIV infection. Furthermore, there were issues regarding the login method for computers shared by multiple staff, the showing of the names of personnel in charge of reports, and the risks associated with direct connections to systems and the Internet and the use of portable media such as USB memory sticks. These results indicated that further efforts are necessary for each facility to continue self-assessment and make improvements.
NASA Technical Reports Server (NTRS)
Sass, J. P.; Raines, N. G.; Farner, B. R.; Ryan, H. M.
2004-01-01
The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is part of NASA's Next Generation Launch Technology (NGLT) program, which seeks to provide safe, dependable, cost-cutting technologies for future space launch systems. The project also is part of the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today s state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The intended full flow engine cycle is a key component in achieving all of the aforementioned goals. The IPD Program achieved a major milestone with the successful completion of the IPD Oxidizer Turbopump (OTP) cold-flow test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in November 2001. A total of 11 IPD OTP cold-flow tests were completed. Following an overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and the cold-flow testing of the IPD OTP. In addition, some of the facility challenges encountered during the test project are addressed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, Robert; Abplanalp, Jennifer M.
2015-03-01
This report presents the results of a study conducted to document the visibility and visual characteristics of the Ivanpah Solar Electric Generating System (ISEGS), a utility-scale solar power tower facility located on land administered by the U.S. Department of the Interior Bureau of Land Management in southern California. Study activities consisted of field observations of the ISEGS facility and comparison of the observations made in the field with the visual contrast assessments and visual simulations in the ISEGS Final Environmental Impact Statement (Final EIS) and supporting documents created prior to ISEGS construction. Field observations of ISEGS were made from 19more » locations within 35 mi (56 km) of the facility in the course of one week in September 2014. The study results established that reflected sunlight from the receivers was the primary source of visual contrast from the operating ISEGS facility. The ISEGS facility was found to be a major source of visual contrast for all observations up to 20 mi (32 km), and was easily visible at 35 mi. Glare from individual heliostats was frequently visible, and often brighter than the reflected light from the receivers. Heliostat glare caused discomfort for one or more viewers at distances up to 20 mi. The ISEGS power blocks were brightly lit at night, and were conspicuous at the observation distance of approximately 6 mi (10 km). The facility is substantially brighter and is seen more clearly in the field than in photographs of the facility or in the prepared simulations, which were based on photographs. The simulations of the ISEGS facility in the Final EIS, which were evaluated as part of this study, sometimes lacked spatial accuracy and realism. The evaluated simulations generally under-represented the actual visual contrast from the project, and some of the contrast ratings in the Final EIS predicted substantially lower levels of visual contrast than were actually observed for the operating facility.« less
Model Deformation Measurements at NASA Langley Research Center
NASA Technical Reports Server (NTRS)
Burner, A. W.
1998-01-01
Only recently have large amounts of model deformation data been acquired in NASA wind tunnels. This acquisition of model deformation data was made possible by the development of an automated video photogrammetric system to measure the changes in wing twist and bending under aerodynamic load. The measurement technique is based upon a single view photogrammetric determination of two dimensional coordinates of wing targets with a fixed third dimensional coordinate, namely the spanwise location. A major consideration in the development of the measurement system was that use of the technique must not appreciably reduce wind tunnel productivity. The measurement technique has been used successfully for a number of tests at four large production wind tunnels at NASA and a dedicated system is nearing completion for a fifth facility. These facilities are the National Transonic Facility, the Transonic Dynamics Tunnel, and the Unitary Plan Wind Tunnel at NASA Langley, and the 12-FT Pressure Tunnel at NASA Ames. A dedicated system for the Langley 16-Foot Transonic Tunnel is scheduled to be used for the first time for a test in September. The advantages, limitations, and strategy of the technique as currently used in NASA wind tunnels are presented. Model deformation data are presented which illustrate the value of these measurements. Plans for further enhancements to the technique are presented.
Wooten, Nikki R; Brittingham, Jordan A; Pitner, Ronald O; Tavakoli, Abbas S; Jeffery, Diana D; Haddock, K Sue
2018-02-06
Behavioral health conditions are a significant concern for the U.S. military and the Military Health System (MHS) because of decreased military readiness and increased health care utilization. Although MHS beneficiaries receive direct care in military treatment facilities, a disproportionate majority of behavioral health treatment is purchased care received in civilian facilities. Yet, limited evidence exists about purchased behavioral health care received by MHS beneficiaries. This longitudinal study (1) estimated the prevalence of purchased behavioral health care and (2) identified patient and visit characteristics predicting receipt of purchased behavioral health care in acute care facilities from 2000 to 2014. Medical claims with Major Diagnostic Code 19 (mental disorders/diseases) or 20 (alcohol/drug disorders) as primary diagnoses and TRICARE as the primary/secondary payer were analyzed for MHS beneficiaries (n = 17,943) receiving behavioral health care in civilian acute care facilities from January 1, 2000, to December 31, 2014. The primary dependent variable, receipt of purchased behavioral health care, was modeled for select mental health and substance use disorders from 2000 to 2014 using generalized estimating equations. Patient characteristics included time, age, sex, and race/ethnicity. Visit types included inpatient hospitalization and emergency department (ED). Time was measured in days and visits were assumed to be correlated over time. Behavioral health care was described by both frequency of patients and visit type. The University of South Carolina Institutional Review Board approved this study. From 2000 to 2014, purchased care visits increased significantly for post-traumatic stress disorder, adjustment, anxiety, mood, bipolar, tobacco use, opioid/combination opioid dependence, nondependent cocaine abuse, psychosocial problems, and suicidal ideation among MHS beneficiaries. The majority of care was received for mental health disorders (78.8%) and care was most often received in EDs (56%). Most commonly treated diagnoses included mood, tobacco use, and alcohol use disorders. ED visits were associated with being treated for anxiety (excluding post-traumatic stress disorder; Adjusted odds ratio [AOR]: 9.14 [95% confidence interval (CI): 8.26, 10.12]), alcohol use disorders (AOR = 1.67 [95% CI: 1.53, 1.83]), tobacco use (AOR = 1.16 [95% CI: 1.06, 1.26]), nondependent cocaine abuse (AOR = 5.47 [95% CI: 3.28, 9.12]), nondependent mixed/unspecified drug abuse (AOR = 7.30 [95% CI: 5.11, 10.44]), and psychosis (AOR = 1.38 [95% CI: 1.20, 1.58]). Compared with adults age 60 yr and older, adolescents (ages 12-17 yr), and adults under age 60 yr were more likely to be treated for suicidal ideation, adjustment, mood, bipolar, post-traumatic stress disorder, nondependent cocaine, and mixed/unspecified drug abuse. Adults under age 60 yr also had increased odds of being treated for tobacco use disorders, alcohol use disorders, and opioid/combination opioid dependence compared with adults age 60 yr and older. Over the past 15 yr, purchased behavioral health care received by MHS beneficiaries in acute care facilities increased significantly. MHS beneficiaries received the majority of purchased behavioral health care for mental health disorders and were treated most often in the ED. Receiving behavioral health care in civilian EDs raises questions about access to outpatient behavioral health care and patient-centered care coordination between civilian and military facilities. Given the influx of new Veterans Health Administration users from the MHS, findings have implications for military, veteran, and civilian facilities providing behavioral health care to military and veteran populations. © Association of Military Surgeons of the United States 2018. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.
NASA Technical Reports Server (NTRS)
Wappes, Loran J.; Sundberg, R.; Mildice, J.; Peterson, D.; Hushing, S.
1987-01-01
The object of this program was to design, build, test, and deliver a high-frequency (20-kHz) Power System Breadboard which would electrically approximate a pair of dual redundant power channels of an IOC Space Station. This report describes that program, including the technical background, and discusses the results, showing that the major assumptions about the characteristics of this class of hardware (size, mass, efficiency, control, etc.) were substantially correct. This testbed equipment has been completed and delivered to LeRC, where it is operating as a part of the Space Station Power System Test Facility.
Space Operations Center - A concept analysis
NASA Technical Reports Server (NTRS)
1980-01-01
The Space Operations Center (SOC) which is a concept for a Shuttle serviced, permanent, manned facility in low earth orbit is viewed as a major candidate for the manned space flight following the completion of an operational Shuttle. The primary objectives of SOC are: (1) the construction, checkout, and transfer to operational orbit of large, complex space systems, (2) on-orbit assembly, launch, recovery, and servicing of manned and unmanned spacecraft, (3) managing operations of co-orbiting free-flying satellites, and (4) the development of reduced dependence on earth for control and resupply. The structure of SOC, a self-contained orbital facility containing several Shuttle launched modules, includes the service, habitation, and logistics modules as well as construction, and flight support facilities. A schedule is proposed for the development of SOC over ten years and costs for the yearly programs are estimated.
Final safety analysis report for the Ground Test Accelerator (GTA), Phase 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-10-01
This document is the first volume of a 3 volume safety analysis report on the Ground Test Accelerator (GTA). The GTA program at the Los Alamos National Laboratory (LANL) is the major element of the national Neutral Particle Beam (NPB) program, which is supported by the Strategic Defense Initiative Office (SDIO). A principal goal of the national NPB program is to assess the feasibility of using hydrogen and deuterium neutral particle beams outside the Earth`s atmosphere. The main effort of the NPB program at Los Alamos concentrates on developing the GTA. The GTA is classified as a low-hazard facility, exceptmore » for the cryogenic-cooling system, which is classified as a moderate-hazard facility. This volume consists of an introduction, summary/conclusion, site description and assessment, description of facility, and description of operation.« less
Ah!Help: A generalized on-line help facility
NASA Technical Reports Server (NTRS)
Yu, Wong Nai; Mantooth, Charmiane; Soulahakil, Alex
1986-01-01
The idea behind the help facility discussed is relatively simple. It is made unique by the fact that it is written in Ada and uses aspects of the language which make information retrieval rapid and simple. Specifically, the DIRECT IO facility allows for random access into the help files. It is necessary to discuss the advantages of random access over sequential access. The mere fact that the program in written in Ada implies a saving in terms of lines of code. This introduces the possibility of eventually adapting the program to run at the microcomputer level, a major consideration . Additionally, since the program uses only standard Ada generics, it is portable to other systems. This is another aspect which must always be taken into consideration in writting any software package in the modern day world of computer programming.
Gautham, Meenakshi; Spicer, Neil; Subharwal, Manish; Gupta, Sanjay; Srivastava, Aradhana; Bhattacharyya, Sanghita; Avan, Bilal Iqbal; Schellenberg, Joanna
2016-09-01
Health information systems are an important planning and monitoring tool for public health services, but may lack information from the private health sector. In this fourth article in a series on district decision-making for health, we assessed the extent of maternal, newborn and child health (MNCH)-related data sharing between the private and public sectors in two districts of Uttar Pradesh, India; analysed barriers to data sharing; and identified key inputs required for data sharing. Between March 2013 and August 2014, we conducted 74 key informant interviews at national, state and district levels. Respondents were stakeholders from national, state and district health departments, professional associations, non-governmental programmes and private commercial health facilities with 3-200 beds. Qualitative data were analysed using a framework based on a priori and emerging themes. Private facilities registered for ultrasounds and abortions submitted standardized records on these services, which is compulsory under Indian laws. Data sharing for other services was weak, but most facilities maintained basic records related to institutional deliveries and newborns. Public health facilities in blocks collected these data from a few private facilities using different methods. The major barriers to data sharing included the public sector's non-standardized data collection and utilization systems for MNCH and lack of communication and follow up with private facilities. Private facilities feared information disclosure and the additional burden of reporting, but were willing to share data if asked officially, provided the process was simple and they were assured of confidentiality. Unregistered facilities, managed by providers without a biomedical qualification, also conducted institutional deliveries, but were outside any reporting loops. Our findings suggest that even without legislation, the public sector could set up an effective MNCH data sharing strategy with private registered facilities by developing a standardized and simple system with consistent communication and follow up. © The Author 2016. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.
Mpunga, Dieudonné; Lumbayi, JP; Dikamba, Nelly; Mwembo, Albert; Ali Mapatano, Mala; Wembodinga, Gilbert
2017-01-01
Objective: To determine the availability and quality of family planning services within health facilities throughout the Democratic Republic of the Congo (DRC). Methods: Data were collected for the cross-sectional study from April 2014 to June 2014 by the Ministry of Public Health. A total of 1,568 health facilities that reported data to the National Health Information System were selected by multistage random sampling in the 11 provinces of the DRC existing at that time. Data were collected through interviews, document review, and direct observation. Two dependent variables were measured: availability of family planning services (consisting of a room for services, staff assigned to family planning, and evidence of client use of family planning) and quality of family planning services (assessed as “high” if the facility had at least 1 trained staff member, family planning service delivery guidelines, at least 3 types of methods, and a sphygmomanometer, or “low” if the facility did not meet any of these 4 criteria). Pearson's chi-square test and odds ratios (ORs) were used to test for significant associations, using the alpha significance level of .05. Results: We successfully surveyed 1,555 facilities (99.2%) of those included in the sample. One in every 3 facilities (33%) offered family planning services as assessed by the index of availability, of which 20% met all 4 criteria for providing high-quality services. Availability was greatest at the highest level of the health system (hospitals) and decreased incrementally with each health system level, with disparities between provinces and urban and rural areas. Facilities in urban areas were more likely than in rural areas to meet the standard for high-quality services (P<.001). Public facilities were less likely than private facilities to have high-quality services (P=.02). Among all 1,555 facilities surveyed, 14% had at least 3 types of methods available at the time of the survey; the most widely available methods were male condoms, combined oral contraceptive pills, and progestin-only injectable contraceptives. Conclusion: Availability and quality of family planning services in health facilities in the DRC remain low, with inequitable distribution of services throughout the country. To improve access to and use of family planning, efforts should focus on improving availability and quality at lower health system levels and in rural areas where the majority of the population lives. PMID:28588047
Dixon, Brian E; Colvard, Cyril; Tierney, William M
2014-06-24
Objective: To support collation of data for disability determination, we sought to accurately identify facilities where care was delivered across multiple, independent hospitals and clinics. Methods: Data from various institutions' electronic health records were merged and delivered as continuity of care documents to the United States Social Security Administration (SSA). Results: Electronic records for nearly 8000 disability claimants were exchanged with SSA. Due to the lack of standard nomenclature for identifying the facilities in which patients received the care documented in the electronic records, SSA could not match the information received with information provided by disability claimants. Facility identifiers were generated arbitrarily by health care systems and therefore could not be mapped to the existing international standards. Discussion: We propose strategies for improving facility identification in electronic health records to support improved tracking of a patient's care between providers to better serve clinical care delivery, disability determination, health reform and meaningful use. Conclusion: Accurately identifying the facilities where health care is delivered to patients is important to a number of major health reform and improvement efforts underway in many nations. A standardized nomenclature for identifying health care facilities is needed to improve tracking of care and linking of electronic health records.
Aliabadi, Amir A.; Rogak, Steven N.; Bartlett, Karen H.; Green, Sheldon I.
2011-01-01
Health care facility ventilation design greatly affects disease transmission by aerosols. The desire to control infection in hospitals and at the same time to reduce their carbon footprint motivates the use of unconventional solutions for building design and associated control measures. This paper considers indoor sources and types of infectious aerosols, and pathogen viability and infectivity behaviors in response to environmental conditions. Aerosol dispersion, heat and mass transfer, deposition in the respiratory tract, and infection mechanisms are discussed, with an emphasis on experimental and modeling approaches. Key building design parameters are described that include types of ventilation systems (mixing, displacement, natural and hybrid), air exchange rate, temperature and relative humidity, air flow distribution structure, occupancy, engineered disinfection of air (filtration and UV radiation), and architectural programming (source and activity management) for health care facilities. The paper describes major findings and suggests future research needs in methods for ventilation design of health care facilities to prevent airborne infection risk. PMID:22162813
Aliabadi, Amir A; Rogak, Steven N; Bartlett, Karen H; Green, Sheldon I
2011-01-01
Health care facility ventilation design greatly affects disease transmission by aerosols. The desire to control infection in hospitals and at the same time to reduce their carbon footprint motivates the use of unconventional solutions for building design and associated control measures. This paper considers indoor sources and types of infectious aerosols, and pathogen viability and infectivity behaviors in response to environmental conditions. Aerosol dispersion, heat and mass transfer, deposition in the respiratory tract, and infection mechanisms are discussed, with an emphasis on experimental and modeling approaches. Key building design parameters are described that include types of ventilation systems (mixing, displacement, natural and hybrid), air exchange rate, temperature and relative humidity, air flow distribution structure, occupancy, engineered disinfection of air (filtration and UV radiation), and architectural programming (source and activity management) for health care facilities. The paper describes major findings and suggests future research needs in methods for ventilation design of health care facilities to prevent airborne infection risk.
Energy use in pig production: an examination of current Iowa systems.
Lammers, P J; Kenealy, M D; Kliebenstein, J B; Harmon, J D; Helmers, M J; Honeyman, M S
2012-03-01
This paper compares energy use for different pig production systems in Iowa, a leader in US swine production. Pig production systems include not only the growth and performance of the pigs, but also the supporting infrastructure of pig production. This supporting infrastructure includes swine housing, facility management, feedstuff provision, swine diets, and manure management. Six different facility type × diet formulation × cropping sequence scenarios were modeled and compared. The baseline system examined produces 15,600 pigs annually using confinement facilities and a corn-soybean cropping sequence. Diet formulations for the baseline system were corn-soybean meal diets that included the synthetic AA l-lysine and exogenous phytase. The baseline system represents the majority of current US pork production in the Upper Midwest, where most US swine are produced. This system was found to require 744.6 MJ per 136-kg market pig. An alternative system that uses bedded hoop barns for grow-finish pigs and gestating sows would require 3% less (720.8 MJ) energy per 136-kg market pig. When swine production systems were assessed, diet type and feed ingredient processing were the major influences on energy use, accounting for 61 and 79% of total energy in conventional and hoop barn-based systems, respectively. Improving feed efficiency and better matching the diet formulation with the thermal environment and genetic potential are thus key aspects of reducing energy use by pig production, particularly in a hoop barn-based system. The most energy-intensive aspect of provisioning pig feed is the production of synthetic N for crop production; thus, effectively recycling manure nutrients to cropland is another important avenue for future research. Almost 25% of energy use by a conventional farrow-to-finish pig production system is attributable to operation of the swine buildings. Developing strategies to minimize energy use for heating and ventilation of swine buildings while maintaining pig comfort and performance is a third critical area for future research. The hoop barn-based alternative uses 64% less energy to operate buildings but requires bedding and 2.4% more feed. Current Iowa pig production systems use energy differently but result in similar total energy use. Compared with 1975, current farrow-to-finish systems in Iowa require 80% less energy to produce live market pigs.
Healthy firms: constraints to growth among private health sector facilities in Ghana and Kenya.
Burger, Nicholas E; Kopf, Daniel; Spreng, Connor P; Yoong, Joanne; Sood, Neeraj
2012-01-01
Health outcomes in developing countries continue to lag the developed world, and many countries are not on target to meet the Millennium Development Goals. The private health sector provides much of the care in many developing countries (e.g., approximately 50 percent in Sub-Saharan Africa), but private providers are often poorly integrated into the health system. Efforts to improve health systems performance will need to include the private sector and increase its contributions to national health goals. However, the literature on constraints private health care providers face is limited. We analyze data from a survey of private health facilities in Kenya and Ghana to evaluate growth constraints facing private providers. A significant portion of facilities (Ghana: 62 percent; Kenya: 40 percent) report limited access to finance as the most significant barrier they face; only a small minority of facilities report using formal credit institutions to finance day to day operations (Ghana: 6 percent; Kenya: 11 percent). Other important barriers include corruption, crime, limited demand for goods and services, and poor public infrastructure. Most facilities have paper-based rather than electronic systems for patient records (Ghana: 30 percent; Kenya: 22 percent), accounting (Ghana: 45 percent; Kenya: 27 percent), and inventory control (Ghana: 41 percent; Kenya: 24 percent). A majority of clinics in both countries report undertaking activities to improve provider skills and to monitor the level and quality of care they provide. However, only a minority of pharmacies report undertaking such activities. The results suggest that improved access to finance and improving business processes especially among pharmacies would support improved contributions by private health facilities. These strategies might be complementary if providers are more able to take advantage of increased access to finance when they have the business processes in place for operating a successful business and health facility.
Healthy Firms: Constraints to Growth among Private Health Sector Facilities in Ghana and Kenya
Burger, Nicholas E.; Kopf, Daniel; Spreng, Connor P.; Yoong, Joanne; Sood, Neeraj
2012-01-01
Background Health outcomes in developing countries continue to lag the developed world, and many countries are not on target to meet the Millennium Development Goals. The private health sector provides much of the care in many developing countries (e.g., approximately 50 percent in Sub-Saharan Africa), but private providers are often poorly integrated into the health system. Efforts to improve health systems performance will need to include the private sector and increase its contributions to national health goals. However, the literature on constraints private health care providers face is limited. Methodology/Principal Findings We analyze data from a survey of private health facilities in Kenya and Ghana to evaluate growth constraints facing private providers. A significant portion of facilities (Ghana: 62 percent; Kenya: 40 percent) report limited access to finance as the most significant barrier they face; only a small minority of facilities report using formal credit institutions to finance day to day operations (Ghana: 6 percent; Kenya: 11 percent). Other important barriers include corruption, crime, limited demand for goods and services, and poor public infrastructure. Most facilities have paper-based rather than electronic systems for patient records (Ghana: 30 percent; Kenya: 22 percent), accounting (Ghana: 45 percent; Kenya: 27 percent), and inventory control (Ghana: 41 percent; Kenya: 24 percent). A majority of clinics in both countries report undertaking activities to improve provider skills and to monitor the level and quality of care they provide. However, only a minority of pharmacies report undertaking such activities. Conclusions/Significance The results suggest that improved access to finance and improving business processes especially among pharmacies would support improved contributions by private health facilities. These strategies might be complementary if providers are more able to take advantage of increased access to finance when they have the business processes in place for operating a successful business and health facility. PMID:22383944
Executive control systems in the engineering design environment
NASA Technical Reports Server (NTRS)
Hurst, P. W.; Pratt, T. W.
1985-01-01
Executive Control Systems (ECSs) are software structures for the unification of various engineering design application programs into comprehensive systems with a central user interface (uniform access) method and a data management facility. Attention is presently given to the most significant determinations of a research program conducted for 24 ECSs, used in government and industry engineering design environments to integrate CAD/CAE applications programs. Characterizations are given for the systems' major architectural components and the alternative design approaches considered in their development. Attention is given to ECS development prospects in the areas of interdisciplinary usage, standardization, knowledge utilization, and computer science technology transfer.
Cutting the cost of hospital HVAC.
Ruddell, Steve
2011-09-01
Steve Ruddell, head of global marketing, Motors & Generators, at ABB, emphasises the importance of a good motor management and maintenance policy in getting the best performance from, and reducing the energy consumption of, hospitals' HVAC systems, also explaining why investing in energy-efficient, low voltage drives, and high efficiency electric motors, to control such equipment, can pay major dividends for estates and facilities teams.
ERIC Educational Resources Information Center
Gosman, Minna L.
Following an analysis of the task of transcribing as practiced in a health facility, this study guide was designed to teach the knowledge and skills required of a medical transcriber. The medical record department was identified as a major occupational area, and a task inventory for medical records was developed and used as a basis for…
ERIC Educational Resources Information Center
Gosman, Minna L.
Following an analysis of the task of transcribing as practiced in a health facility, this study guide was developed to teach the knowledge and skills required of a medical transcriber. The medical record department was identified as a major occupational area, and a task inventory for medical records was developed and used as a basis for a…
CONCEPTUAL DESIGN ASSESSMENT FOR THE COFIRING OF BIOREFINERY SUPPLIED LIGNIN PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
David J. Webster; Jeffrey T. Ranney; Jacqueline G. Broder
2002-07-01
The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed. Processing of biosolids and pilot facility hydrolysis production have been completed to produce lignin for cofire testing. EERC had received all the biomass and baseline coal fuels for use in testing. All the combustion and fuel handling tests at EERC have been completed. During fuel preparation EERC reported no difficulties in fuel blending and handling. Preliminary cofire test results indicate that the blending of lignin and biosolids with the Colbert coal blendmore » generally reduces NOx emissions, increases the reactivity of the coal, and increases the ash deposition rate on superheater surfaces. Deposits produced from the fuel blends, however, are more friable and hence easier to remove from tube surfaces relative to those produced from the baseline Colbert coal blend. A draft of the final cofire technical report entitled ''Effects of Cofiring Lignin and Biosolids with Coal on Fireside Performance and Combustion Products'' has been prepared and is currently being reviewed by project team members. A final report is expected by mid-third quarter 2002. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The environmental review, preferred steam supply connection points and steam pipeline routing, and assessment of steam export impacts have been completed without major issue. A cost estimate for the steam supply system was also completed. TVA is further evaluating the impacts of adding lignin to the coal fuel blend and how the steam cost is impacted by proximity of the Masada biomass facility. TVA has provided a draft final report that is under review by team members.« less
SSBRP User Operations Facility (UOF) Overview and Development Strategy
NASA Technical Reports Server (NTRS)
Picinich, Lou; Stone, Thom; Sun, Charles; Windrem, May; Givens, John J. (Technical Monitor)
1995-01-01
This paper will present the Space Station Biological Research Project (SSBRP) User Operations Facility (UOF) architecture and development strategy. A major element of the UOF at NASA Ames Research Center, the Communication and Data System (CDS) will be the primary focus of the discussions. CDS operational, telescience, security, and development objectives will be discussed along with CDS implementation strategy. The implementation strategy discussions will include: Object Oriented Analysis & Design, System & Software Prototyping, and Technology Utilization. A CDS design overview that includes: CDS Context Diagram, CDS Architecture, Object Models, Use Cases, and User Interfaces will also be presented. CDS development brings together "cutting edge" technologies and techniques such as: object oriented development, network security, multimedia networking, web-based data distribution, JAVA, and graphical user interfaces. Use of these "cutting edge" technologies and techniques translates directly to lower development and operations costs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gloudemans, J.R.
1991-08-01
The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock Wilcox. The unique features of the Babcock Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to addresss the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility -- the once-through integralmore » system (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST program is reported in eleven volumes; Volumes 2 through 8 pertain to groups of Phase 3 tests by type, Volume 9 presents inter-group comparisons. Volume 10 provides comparisons between the RELAP5 MOD2 calculations and MIST observations, and Volume 11 (with addendum) presents the later, Phase 4 tests. This is Volume 1 of the MIST final report, a summary of the entire MIST program. Major topics include: test advisory grop (TAG) issues; facility scaling and design; test matrix; observations; comparisons of RELAP5 calculations to MIST observations; and MIST versus the TAG issues. 11 refs., 29 figs., 9 tabs.« less
Financial and operational ratios for bond-insured hospitals.
McCue, Michael J; McCluer, R Forrest
2008-01-01
Few, if any, researchers have analyzed the performance indicators of companies that offer bond insurance to hospitals and healthcare systems. The authors of this study analyzed the key financial and operational indicators of independent hospitals and hospitals within large multihospital systems that are insured by the 5 major bond insurance companies. The authors examined 87 insured bond issues; the results of this study show that some insurers cover healthcare facilities that have strong operational traits and others focus on financial factors.
2013-08-01
Wildlife Service VOC volatile organic compound WG/CC Wing, Commanding Officer WSSC Washington Suburban Sanitary Commission WWTP waste water...2009a). 3.3 Infrastructure and Utilities 3.3.1 Wastewater Collection and Treatment Sanitary Sewer The sanitary sewer system at JBA was privatized...in February 2006. Terrapin Utility Services, Inc., owns and operates the sanitary sewer system (JBA-NAFW 2013). The majority of the sanitary sewer
NASA Astrophysics Data System (ADS)
Francisco, Glen; Brown, Todd
2012-06-01
Integrated security systems are essential to pre-empting criminal assaults. Nearly 500,000 sites have been identified (source: US DHS) as critical infrastructure sites that would suffer severe damage if a security breach should occur. One major breach in any of 123 U.S. facilities, identified as "most critical", threatens more than 1,000,000 people. The vulnerabilities of critical infrastructure are expected to continue and even heighten over the coming years.
Earth observation archive activities at DRA Farnborough
NASA Technical Reports Server (NTRS)
Palmer, M. D.; Williams, J. M.
1993-01-01
Space Sector, Defence Research Agency (DRA), Farnborough have been actively involved in the acquisition and processing of Earth Observation data for over 15 years. During that time an archive of over 20,000 items has been built up. This paper describes the major archive activities, including: operation and maintenance of the main DRA Archive, the development of a prototype Optical Disc Archive System (ODAS), the catalog systems in use at DRA, the UK Processing and Archive Facility for ERS-1 data, and future plans for archiving activities.
IMPLEMENTATION OF DEFENSE NUCLEAR FACILITY SAFETY BOARD RECOMMENDATION 2000-2 AT WIPP
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jackson, K.; Wu, C.
2002-02-26
The Defense Nuclear Safeties Board (DNFSB) issued Recommendation 2000-2 on March 8, 2000, concerning the degrading conditions of vital safety systems, or systems important to nuclear safety, at DOE sites across the nation. The Board recommended that the DOE take action to assess the condition of its nuclear systems to ensure continued operational readiness of vital safety systems that are important for safely accomplishing the DOE's mission. To verify the readiness of vital safety systems, a two-phased approach was established. Phase I consisted of a qualitative assessment to approved criteria of the defined vital safety systems by operating contractor personnel,more » overseen by Federal field office personnel. Based on Phase I Assessment results, vital safety systems with significant deficiencies would be further assessed in Phase II, a more extensive quantitative assessment, by a contractor and Federal team, using a second set of criteria. In addition, Defense Nuclear Facility Safety Board Recommendation 2000-2 concluded that the degradation of confinement ventilation systems was of major concern, and issued a separate set of criteria to perform a Phase II Assessment on confinement ventilation systems.« less
2009-11-19
CAPE CANAVERAL, Fla. – A ceremonial "flipping of the switch" officially begins operation of NASA's first large-scale solar power generation facility at NASA's Kennedy Space Center in Florida. Flipping the four-foot-tall light switch in unison are, from left, Bob Cabana, Kennedy center director; Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation; and Eric Silagy, Florida Power & Light Company vice president and chief development officer. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
Urban hospital 'clusters' do shift high-risk procedures to key facilities, but more could be done.
Luke, Roice D; Luke, Tyler; Muller, Nancy
2011-09-01
Since the 1990s, rapid consolidation in the hospital sector has resulted in the vast majority of hospitals joining systems that already had a considerable presence within their markets. We refer to these important local and regional systems as "clusters." To determine whether hospital clusters have taken measurable steps aimed at improving the quality of care-specifically, by concentrating low-volume, high-complexity services within selected "lead" facilities-this study examined within-cluster concentrations of high-risk cases for seven surgical procedures. We found that lead hospitals on average performed fairly high percentages of the procedures per cluster, ranging from 59 percent for esophagectomy to 87 percent for aortic valve replacement. The numbers indicate that hospitals might need to work with rival facilities outside their cluster to concentrate cases for the lowest-volume procedures, such as esophagectomies, whereas coordination among cluster members might be sufficient for higher-volume procedures. The results imply that policy makers should focus on clusters' potential for restructuring care and further coordinating services across hospitals in local areas.
Bowyer, Theodore W; Kephart, Rosara; Eslinger, Paul W; Friese, Judah I; Miley, Harry S; Saey, Paul R J
2013-01-01
Fission gases such as (133)Xe are used extensively for monitoring the world for signs of nuclear testing in systems such as the International Monitoring System (IMS). These gases are also produced by nuclear reactors and by fission production of (99)Mo for medical use. Recently, medical isotope production facilities have been identified as the major contributor to the background of radioactive xenon isotopes (radioxenon) in the atmosphere (Stocki et al., 2005; Saey, 2009). These releases pose a potential future problem for monitoring nuclear explosions if not addressed. As a starting point, a maximum acceptable daily xenon emission rate was calculated, that is both scientifically defendable as not adversely affecting the IMS, but also consistent with what is possible to achieve in an operational environment. This study concludes that an emission of 5 × 10(9) Bq/day from a medical isotope production facility would be both an acceptable upper limit from the perspective of minimal impact to monitoring stations, but also appears to be an achievable limit for large isotope producers. Copyright © 2012 Elsevier Ltd. All rights reserved.
Final safety analysis report for the Ground Test Accelerator (GTA), Phase 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-10-01
This document is the second volume of a 3 volume safety analysis report on the Ground Test Accelerator (GTA). The GTA program at the Los Alamos National Laboratory (LANL) is the major element of the national Neutral Particle Beam (NPB) program, which is supported by the Strategic Defense Initiative Office (SDIO). A principal goal of the national NPB program is to assess the feasibility of using hydrogen and deuterium neutral particle beams outside the Earth`s atmosphere. The main effort of the NPB program at Los Alamos concentrates on developing the GTA. The GTA is classified as a low-hazard facility, exceptmore » for the cryogenic-cooling system, which is classified as a moderate-hazard facility. This volume consists of failure modes and effects analysis; accident analysis; operational safety requirements; quality assurance program; ES&H management program; environmental, safety, and health systems critical to safety; summary of waste-management program; environmental monitoring program; facility expansion, decontamination, and decommissioning; summary of emergency response plan; summary plan for employee training; summary plan for operating procedures; glossary; and appendices A and B.« less
A spatial national health facility database for public health sector planning in Kenya in 2008.
Noor, Abdisalan M; Alegana, Victor A; Gething, Peter W; Snow, Robert W
2009-03-06
Efforts to tackle the enormous burden of ill-health in low-income countries are hampered by weak health information infrastructures that do not support appropriate planning and resource allocation. For health information systems to function well, a reliable inventory of health service providers is critical. The spatial referencing of service providers to allow their representation in a geographic information system is vital if the full planning potential of such data is to be realized. A disparate series of contemporary lists of health service providers were used to update a public health facility database of Kenya last compiled in 2003. These new lists were derived primarily through the national distribution of antimalarial and antiretroviral commodities since 2006. A combination of methods, including global positioning systems, was used to map service providers. These spatially-referenced data were combined with high-resolution population maps to analyze disparity in geographic access to public health care. The updated 2008 database contained 5,334 public health facilities (67% ministry of health; 28% mission and nongovernmental organizations; 2% local authorities; and 3% employers and other ministries). This represented an overall increase of 1,862 facilities compared to 2003. Most of the additional facilities belonged to the ministry of health (79%) and the majority were dispensaries (91%). 93% of the health facilities were spatially referenced, 38% using global positioning systems compared to 21% in 2003. 89% of the population was within 5 km Euclidean distance to a public health facility in 2008 compared to 71% in 2003. Over 80% of the population outside 5 km of public health service providers was in the sparsely settled pastoralist areas of the country. We have shown that, with concerted effort, a relatively complete inventory of mapped health services is possible with enormous potential for improving planning. Expansion in public health care in Kenya has resulted in significant increases in geographic access although several areas of the country need further improvements. This information is key to future planning and with this paper we have released the digital spatial database in the public domain to assist the Kenyan Government and its partners in the health sector.
NASA Technical Reports Server (NTRS)
Jordan, Thomas L.; Bailey, Roger M.
2008-01-01
As part of the Airborne Subscale Transport Aircraft Research (AirSTAR) project, NASA Langley Research Center (LaRC) has developed a subscaled flying testbed in order to conduct research experiments in support of the goals of NASA s Aviation Safety Program. This research capability consists of three distinct components. The first of these is the research aircraft, of which there are several in the AirSTAR stable. These aircraft range from a dynamically-scaled, twin turbine vehicle to a propeller driven, off-the-shelf airframe. Each of these airframes carves out its own niche in the research test program. All of the airplanes have sophisticated on-board data acquisition and actuation systems, recording, telemetering, processing, and/or receiving data from research control systems. The second piece of the testbed is the ground facilities, which encompass the hardware and software infrastructure necessary to provide comprehensive support services for conducting flight research using the subscale aircraft, including: subsystem development, integrated testing, remote piloting of the subscale aircraft, telemetry processing, experimental flight control law implementation and evaluation, flight simulation, data recording/archiving, and communications. The ground facilities are comprised of two major components: (1) The Base Research Station (BRS), a LaRC laboratory facility for system development, testing and data analysis, and (2) The Mobile Operations Station (MOS), a self-contained, motorized vehicle serving as a mobile research command/operations center, functionally equivalent to the BRS, capable of deployment to remote sites for supporting flight tests. The third piece of the testbed is the test facility itself. Research flights carried out by the AirSTAR team are conducted at NASA Wallops Flight Facility (WFF) on the Eastern Shore of Virginia. The UAV Island runway is a 50 x 1500 paved runway that lies within restricted airspace at Wallops Flight Facility. The facility provides all the necessary infrastructure to conduct the research flights in a safe and efficient manner. This paper gives a comprehensive overview of the development of the AirSTAR testbed.
Performance of a 12-coil superconducting 'bumpy torus' magnet facility.
NASA Technical Reports Server (NTRS)
Roth, J. R.; Holmes, A. D.; Keller, T. A.; Krawczonek, W. M.
1972-01-01
The NASA-Lewis 'bumpy torus' facility consists of 12 superconducting coils, each 19 cm ID and capable of 3.0 tesla on their axes. The coils are equally spaced around a toroidal array with a major diameter of 1.52 m, and are mounted with the major axis of the torus vertical in a single vacuum tank 2.6 m in diameter. Final shakedown tests of the facility mapped out its magnetic, cryogenic, vacuum, mechanical, and electrical performance. The facility is now ready for use as a plasma physics research facility. A maximum magnetic field on the magnetic axis of 3.23 teslas has been held for a period of more than sixty minutes without a coil normalcy.
Varghese, Beena; Krishnamurthy, Jayanna; Correia, Blaze; Panigrahi, Ruchika; Washington, Maryann; Ponnuswamy, Vinotha; Mony, Prem
2016-12-23
The majority of the maternal and perinatal deaths are preventable through improved emergency obstetric and newborn care at facilities. However, the quality of such care in India has significant gaps in terms of provider skills and in their preparedness to handle emergencies. We tested the feasibility, acceptability, and effectiveness of a "skills and drills" intervention, implemented between July 2013 and September 2014, to improve emergency obstetric and newborn care in the state of Karnataka, India. Emergency drills through role play, conducted every 2 months, combined with supportive supervision and a 2-day skills refresher session were delivered across 4 sub-district, secondary-level government facilities by an external team of obstetric and pediatric specialists and nurses. We evaluated the intervention through a quasi-experimental design with 4 intervention and 4 comparison facilities, using delivery case sheet reviews, pre- and post-knowledge tests among providers, objective structured clinical examinations (OSCEs), and qualitative in-depth interviews. Primary outcomes consisted of improved diagnosis and management of selected maternal and newborn complications (postpartum hemorrhage, pregnancy-induced hypertension, and birth asphyxia). Secondary outcomes included knowledge and skill levels of providers and acceptability and feasibility of the intervention. Knowledge scores among providers improved significantly in the intervention facilities; in obstetrics, average scores between the pre- and post-test increased from 49% to 57% (P=.006) and in newborn care, scores increased from 48% to 56% (P=.03). Knowledge scores in the comparison facilities were similar but did not improve significantly over time. Skill levels were significantly higher among providers in intervention facilities than comparison facilities (mean objective structured clinical examination scores for obstetric skills: 55% vs. 46%, respectively; for newborn skills: 58% vs. 48%, respectively; P<.001 for both obstetric and newborn), along with their confidence in managing complications. However, this did not result in significant differences in correct diagnosis and management of complications between intervention and comparison facilities. Shortage of trained nurses and doctors along with unavailability of a consistent supply chain was cited by most providers as major health systems barriers affecting provision of care. Improvements in knowledge, skills, and confidence levels of providers as a result of the skills and drills intervention was not sufficient to translate into improved diagnosis and management of maternal and newborn complications. System-level changes including adequate in-service training may also be necessary to improve maternal and newborn outcomes. © Varghese et al.
Department of Energy Other Major Laboratories and Facilities
major laboratories and facilities. This high-level compilation of their history and achievements Laboratory (NBL) History About Background/History of the Laboratory New Brunswick Laboratory website TOP dropdown listing Oak Ridge Institute for Science and Education (ORISE) History Environmental Assessments
78 FR 4414 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... or Major Renovation of Tribal 5 1 20 100 Child Care Facilities Estimated Total Annual Burden Hours... OMB Review; Comment Request Title: Procedures for Requests from Tribal Lead Agencies to use Child Care and Development Fund (CCDF) Funds for Construction or Major Renovation of Child Care Facilities. OMB...
Harries, Anthony D; Schouten, Erik J; Makombe, Simon D; Libamba, Edwin; Neufville, Henry N; Some, Eliab; Kadewere, Godfrey; Lungu, Douglas
2007-02-01
Drug procurement and distribution practices are weak in many resource-poor countries, and are a major reason for lack of access to medicines. With many countries scaling up antiretroviral therapy (ART), it is vital to avoid interrupted drug supplies, which would lead to drug resistance and treatment failure. Malawi has adapted a model, based on that adopted by the country's Tuberculosis Control Programme, to allow rational ART drug forecasting. The model includes a focus on one standardized first-line ART regimen; a "push system" and "ceilings" for first-line ART drugs for facilities; use of starter pack and continuation pack kits; quarterly monitoring of patient outcomes and ART drug stocks at facility level; provision of a three-month buffer stock of ART drugs at facility level; and use of a procurement and distribution system outside central medical stores. The focus on a single first-line regimen, "ceilings" for first-line ART drugs and quarterly data collections to calculate drug needs (for new and follow-up patients, respectively), as well as the use of an independent procurement facility, allow drug orders to be made 6-9 months ahead. These measures have so far ensured that there have been no ART drug stock-outs in the country.
Covert, Michael
2012-01-01
Hospital construction is a significant event in any health system. The financial implications are great, especially at a time of shrinking capital resources. Personnel are affected, as are the processes to perform their tasks. Often, new facilities are catalysts that change organizational culture; it has been clearly shown that new facilities have a positive impact on patient satisfaction scores. The members of the C-suite of a hospital/health system play important roles in construction projects. However, no one is more critical to the success of such major endeavors than the chief executive officer (CEO). The CEO sets the tone for the project, giving direction to the design and construction process that may have implications for the rest of the organization. Palomar Pomerado Health (PPH) is the largest public health district in California. In 2002, the PPH governing board authorized the creation of a new facility master plan for the district, which included the construction of a replacement facility for its tertiary care trauma center. The new Palomar Medical Center is slated to open in August 2012. HERD had the opportunity to speak with PPH CEO Michael H. Covert on the role of the CEO in the building of this "fable hospital".
Establishment and assessment of code scaling capability
NASA Astrophysics Data System (ADS)
Lim, Jaehyok
In this thesis, a method for using RELAP5/MOD3.3 (Patch03) code models is described to establish and assess the code scaling capability and to corroborate the scaling methodology that has been used in the design of the Purdue University Multi-Dimensional Integral Test Assembly for ESBWR applications (PUMA-E) facility. It was sponsored by the United States Nuclear Regulatory Commission (USNRC) under the program "PUMA ESBWR Tests". PUMA-E facility was built for the USNRC to obtain data on the performance of the passive safety systems of the General Electric (GE) Nuclear Energy Economic Simplified Boiling Water Reactor (ESBWR). Similarities between the prototype plant and the scaled-down test facility were investigated for a Gravity-Driven Cooling System (GDCS) Drain Line Break (GDLB). This thesis presents the results of the GDLB test, i.e., the GDLB test with one Isolation Condenser System (ICS) unit disabled. The test is a hypothetical multi-failure small break loss of coolant (SB LOCA) accident scenario in the ESBWR. The test results indicated that the blow-down phase, Automatic Depressurization System (ADS) actuation, and GDCS injection processes occurred as expected. The GDCS as an emergency core cooling system provided adequate supply of water to keep the Reactor Pressure Vessel (RPV) coolant level well above the Top of Active Fuel (TAF) during the entire GDLB transient. The long-term cooling phase, which is governed by the Passive Containment Cooling System (PCCS) condensation, kept the reactor containment system that is composed of Drywell (DW) and Wetwell (WW) below the design pressure of 414 kPa (60 psia). In addition, the ICS continued participating in heat removal during the long-term cooling phase. A general Code Scaling, Applicability, and Uncertainty (CSAU) evaluation approach was discussed in detail relative to safety analyses of Light Water Reactor (LWR). The major components of the CSAU methodology that were highlighted particularly focused on the scaling issues of experiments and models and their applicability to the nuclear power plant transient and accidents. The major thermal-hydraulic phenomena to be analyzed were identified and the predictive models adopted in RELAP5/MOD3.3 (Patch03) code were briefly reviewed.
Comparison of hospitalization rates among for-profit and nonprofit dialysis facilities.
Dalrymple, Lorien S; Johansen, Kirsten L; Romano, Patrick S; Chertow, Glenn M; Mu, Yi; Ishida, Julie H; Grimes, Barbara; Kaysen, George A; Nguyen, Danh V
2014-01-01
The vast majority of US dialysis facilities are for-profit and profit status has been associated with processes of care and outcomes in patients on dialysis. This study examined whether dialysis facility profit status was associated with the rate of hospitalization in patients starting dialysis. This was a retrospective cohort study of Medicare beneficiaries starting dialysis between 2005 and 2008 using data from the US Renal Data System. All-cause hospitalization was examined and compared between for-profit and nonprofit dialysis facilities through 2009 using Poisson regression. Companion analyses of cause-specific hospitalization that are likely to be influenced by dialysis facility practices including hospitalizations for heart failure and volume overload, access complications, or hyperkalemia were conducted. The cohort included 150,642 patients. Of these, 12,985 (9%) were receiving care in nonprofit dialysis facilities. In adjusted models, patients receiving hemodialysis in for-profit facilities had a 15% (95% confidence interval [95% CI], 13% to 18%) higher relative rate of hospitalization compared with those in nonprofit facilities. Among patients receiving peritoneal dialysis, the rate of hospitalization in for-profit versus nonprofit facilities was not significantly different (relative rate, 1.07; 95% CI, 0.97 to 1.17). Patients on hemodialysis receiving care in for-profit dialysis facilities had a 37% (95% CI, 31% to 44%) higher rate of hospitalization for heart failure or volume overload and a 15% (95% CI, 11% to 20%) higher rate of hospitalization for vascular access complications. Hospitalization rates were significantly higher for patients receiving hemodialysis in for-profit compared with nonprofit dialysis facilities.
Planning Requirements for Small School Facilities.
ERIC Educational Resources Information Center
Davis, J. Clark; McQueen, Robert
The unique requirements of small school facilities, designed to handle multiple curricular functions within the same operational space, necessitate the creation of educational specifications tying the curriculum to that portion of the facility in which each curriculum component will be implemented. Thus, in planning the facility the major concern…
Nevada National Security Site Environmental Report 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wills
This Nevada National Security Site Environmental Report (NNSSER) was prepared to satisfy DOE Order DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. This NNSSERmore » summarizes data and compliance status for calendar year 2016 at the Nevada National Security Site (NNSS) and its two Nevada-based support facilities, the North Las Vegas Facility (NLVF) and the Remote Sensing Laboratory–Nellis (RSL-Nellis). It also addresses environmental restoration (ER) projects conducted at the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). NNSA/NFO directs the management and operation of the NNSS and six sites across the nation. In addition to the NNSA itself, the six sites include two in Nevada (NLVF and RSL-Nellis) and four in other states (RSL-Andrews in Maryland, Livermore Operations in California, Los Alamos Operations in New Mexico, and Special Technologies Laboratory in California). Los Alamos, Lawrence Livermore, and Sandia National Laboratories are the principal organizations that sponsor and implement the nuclear weapons programs at the NNSS. National Security Technologies, LLC (NSTec), is the current Management and Operating contractor accountable for the successful execution of work and ensuring that work is performed in compliance with environmental regulations. The six sites all provide support to enhance the NNSS as a location for its multiple missions. The three major NNSS missions include National Security/Defense, Environmental Management, and Nondefense. The major programs that support these missions are Stockpile Stewardship and Management, Nonproliferation and Counterterrorism, Nuclear Emergency Response, Strategic Partnership Projects, Environmental Restoration, Waste Management, Conservation and Renewable Energy, Other Research and Development, and Infrastructure. The major facilities that support the programs include the U1a Facility, Big Explosives Experimental Facility (BEEF), Device Assembly Facility, Dense Plasma Focus Facility, Joint Actinide Shock Physics Experimental Research Facility, Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nonproliferation Test and Evaluation Complex (NPTEC), Radiological/Nuclear Weapons of Mass Destruction Incident Exercise Site, the Area 5 Radioactive Waste Management Complex (RWMC), and the Area 3 Radioactive Waste Management Site (RWMS).« less
Urban Wood-Based Bio-Energy Systems in Seattle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stan Gent, Seattle Steam Company
2010-10-25
Seattle Steam Company provides thermal energy service (steam) to the majority of buildings and facilities in downtown Seattle, including major hospitals (Swedish and Virginia Mason) and The Northwest (Level I) Regional Trauma Center. Seattle Steam has been heating downtown businesses for 117 years, with an average length of service to its customers of 40 years. In 2008 and 2009 Seattle Steam developed a biomass-fueled renewable energy (bio-energy) system to replace one of its gas-fired boilers that will reduce greenhouse gases, pollutants and the amount of waste sent to landfills. This work in this sub-project included several distinct tasks associated withmore » the biomass project development as follows: a. Engineering and Architecture: Engineering focused on development of system control strategies, development of manuals for start up and commissioning. b. Training: The project developer will train its current operating staff to operate equipment and facilities. c. Flue Gas Clean-Up Equipment Concept Design: The concept development of acid gas emissions control system strategies associated with the supply wood to the project. d. Fuel Supply Management Plan: Development of plans and specifications for the supply of wood. It will include potential fuel sampling analysis and development of contracts for delivery and management of fuel suppliers and handlers. e. Integrated Fuel Management System Development: Seattle Steam requires a biomass Fuel Management System to track and manage the delivery, testing, processing and invoicing of delivered fuel. This application will be web-based and accessed from a password-protected URL, restricting data access and privileges by user-level.« less
1972-01-01
This photograph shows the flight article of the Airlock Module (AM)/Multiple Docking Adapter (MDA) assembly being readied for testing in a clean room at the McDornell Douglas Plant in St. Louis, Missouri. Although the AM and the MDA were separate entities, they were in many respects simply two components of a single module. The AM enabled crew members to conduct extravehicular activities outside Skylab as required for experiment support. Oxygen and nitrogen storage tanks needed for Skylab's life support system were mounted on the external truss work of the AM. Major components in the AM included Skylab's electric power control and distribution station, environmental control system, communication system, and data handling and recording systems. The MDA, forward of the AM, provided docking facilities for the Command and Service Module. It also accommodated several experiment systems, among them the Earth Resource Experiment Package, the materials processing facility, and the control and display console needed for the Apollo Telescope Mount solar astronomy studies. The AM was built by McDonnell Douglas and the MDA was built by Martin Marietta. The Marshall Space Flight Center was responsible for the design and development of the Skylab hardware and experiment management.
1972-03-01
This photograph shows the flight article of the mated Airlock Module (AM) and Multiple Docking Adapter (MDA) being lowering into horizontal position on a transporter. Although the AM and the MDA were separate entities, they were in many respects simply two components of a single module. The AM enabled crew members to conduct extravehicular activities outside Skylab as required for experiment support. Oxygen and nitrogen storage tanks needed for Skylab's life support system were mounted on the external truss work of the AM. Major components in the AM included Skylab's electric power control and distribution station, environmental control system, communication system, and data handling and recording systems. The MDA, forward of the AM, provided docking facilities for the Command and Service Module. It also accommodated several experiment systems, among them the Earth Resource Experiment Package, the materials processing facility, and the control and display console needed for the Apollo Telescope Mount solar astronomy studies. The AM was built by McDornell Douglas and the MDA was built by Martin Marietta. The Marshall Space Flight Center was responsible for the design and development of the Skylab hardware and experiment management.
Astrometric Telescope Facility isolation and pointing study
NASA Technical Reports Server (NTRS)
Hibble, William; Allen, Terry; Jackson, Louis; Medbery, James; Self, Richard
1988-01-01
The Astrometric Telescope Facility (ATF), an optical telescope designed to detect extrasolar planetary systems, is scheduled to be a major user of the Space Station's Payload Pointing System (PPS). However, because the ATF has such a stringent pointing stability specification and requires + or - 180 deg roll about its line of sight, mechanisms to enhance the basic PPS capability are required. The ATF pointing performance achievable by the addition of a magnetic isolation and pointing system (MIPS) between the PPS upper gimbal and the ATF, and separately, by the addition of a passive isolation system between the Space Station and the PPS base was investigated. The candidate MIPS can meet the ATF requirements in the presence of a 0.01 g disturbance. It fits within the available annular region between the PPS and the ATF while meeting power and weight limitations and providing the required roll motion, payload data and power services. By contrast, the passive base isolator system must have an unrealistically low isolation bandwidth on all axes to meet ATF pointing requirements and does not provide roll about the line of sight.
Airborne water vapor DIAL research: System development and field measurements
NASA Technical Reports Server (NTRS)
Higdon, Noah S.; Browell, Edward V.; Ponsardin, Patrick; Chyba, Thomas H.; Grossmann, Benoist E.; Butler, Carolyn F.; Fenn, Marta A.; Mayor, Shane D.; Ismail, Syed; Grant, William B.
1992-01-01
This paper describes the airborne differential absorption lidar (DIAL) system developed at the NASA Langley Research Center for remote measurement of water vapor (H2O) and aerosols in the lower atmosphere. The airborne H2O DIAL system was flight tested aboard the NASA Wallops Flight Facility (WFF) Electra aircraft in three separate field deployments between 1989 and 1991. Atmospheric measurements were made under a variety of atmospheric conditions during the flight tests, and several modifications were implemented during this development period to improve system operation. A brief description of the system and major modifications will be presented, and the most significant atmospheric observations will be described.
Ground based ISS payload microgravity disturbance assessments.
McNelis, Anne M; Heese, John A; Samorezov, Sergey; Moss, Larry A; Just, Marcus L
2005-01-01
In order to verify that the International Space Station (ISS) payload facility racks do not disturb the microgravity environment of neighboring facility racks and that the facility science operations are not compromised, a testing and analytical verification process must be followed. Currently no facility racks have taken this process from start to finish. The authors are participants in implementing this process for the NASA Glenn Research Center (GRC) Fluids and Combustion Facility (FCF). To address the testing part of the verification process, the Microgravity Emissions Laboratory (MEL) was developed at GRC. The MEL is a 6 degree of freedom inertial measurement system capable of characterizing inertial response forces (emissions) of components, sub-rack payloads, or rack-level payloads down to 10(-7) g's. The inertial force output data, generated from the steady state or transient operations of the test articles, are utilized in analytical simulations to predict the on-orbit vibratory environment at specific science or rack interface locations. Once the facility payload rack and disturbers are properly modeled an assessment can be made as to whether required microgravity levels are achieved. The modeling is utilized to develop microgravity predictions which lead to the development of microgravity sensitive ISS experiment operations once on-orbit. The on-orbit measurements will be verified by use of the NASA GRC Space Acceleration Measurement System (SAMS). The major topics to be addressed in this paper are: (1) Microgravity Requirements, (2) Microgravity Disturbers, (3) MEL Testing, (4) Disturbance Control, (5) Microgravity Control Process, and (6) On-Orbit Predictions and Verification. Published by Elsevier Ltd.
Energy Systems Integration Facility Control Room | Energy Systems
Integration Facility | NREL Energy Systems Integration Facility Control Room Energy Systems Integration Facility Control Room The Energy Systems Integration Facility control room allows system engineers as the monitoring point for the facility's integrated safety and control systems. Photo of employees
Major Range and Test Facility Base Summary of Capabilities.
1983-06-01
TEST CHART NATIONAL BUREAU OF STANDARDS 1963 A 3,i 4, S °.I i L -. ~ . % o,. ° . - ° . - . .I ¢ PHOTOGRAPH THIS SHEET LEVEL INVENTORY DOCUMENT...NUMBER DOD 3200.11-D 4. TTLE(~dS..tt~t@) S TYPE Of REPORT a PERIO’ COVERED Major Range and Test Facility Base Summary Reference Maerial of Capabilities...Electronic Warfare, Command, Control Communications and Intelligence (C31) Surveillance, Jammers, Radar, Test Facility ZG5 ABETW ACT f~ a "Afie Afr- s 444 eF~f
Understanding Excess Emissions from Industrial Facilities: Evidence from Texas.
Zirogiannis, Nikolaos; Hollingsworth, Alex J; Konisky, David M
2018-03-06
We analyze excess emissions from industrial facilities in Texas using data from the Texas Commission on Environmental Quality. Emissions are characterized as excess if they are beyond a facility's permitted levels and if they occur during startups, shutdowns, or malfunctions. We provide summary data on both the pollutants most often emitted as excess emissions and the industrial sectors and facilities responsible for those emissions. Excess emissions often represent a substantial share of a facility's routine (or permitted) emissions. We find that while excess emissions events are frequent, the majority of excess emissions are emitted by the largest events. That is, the sum of emissions in the 96-100th percentile is often several orders of magnitude larger than the remaining excess emissions (i.e., the sum of emissions below the 95th percentile). Thus, the majority of events emit a small amount of pollution relative to the total amount emitted. In addition, a small group of high emitting facilities in the most polluting industrial sectors are responsible for the vast majority of excess emissions. Using an integrated assessment model, we estimate that the health damages in Texas from excess emissions are approximately $150 million annually.
Gerrard, Paul
2013-01-01
Nursing facility patients are a population that has not been well studied with regard to functional status and independence previously. As such, the manner in which activities of daily living (ADL) relate to one another is not well understood in this population. An understanding of ADL difficulty ordering has helped to devise systems of functional independence grading in other populations, which have value in understanding patients' global levels of independence and providing expectations regarding changes in function. This study seeks to examine the hierarchy of ADL in the nursing facility population. Data were analyzed from the 2004 National Nursing Home Survey, a cross-sectional data set of 13 507 skilled nursing facility subjects with functional independence items. The ADL difficulty hierarchy was determined using Rasch analysis. Item fit values for the Rasch model using Mean-Square infit statistics were also determined. The robustness of the hierarchy was tested for each ADL. Two grading systems were devised from the results of the item difficulty ordering. One was based on the most difficult item that he or she could perform, and the other assigned a grade based on the least difficult item that a subject could not perform. A total of 13 113 patients were included in this analysis, the majority of whom were female and white. They had an average age of 81 years. An ordered hierarchy of ADL was found with eating being the easiest and bathing the most difficult. All items in the Katz index fit the Rasch model adequately well. The majority of patients able to perform any particular ADL were also able to perform all easier ADL. Cohen's κ for the 2 grading systems was 0.73. This study is the first to show the expected hierarchy of difficulty of the 6 activities of daily proposed in the Katz index in the nursing facility population. The hierarchy found in this population matches the original hierarchy found in older adults in the community and acute care settings. It is also similar to hierarchy found in the inpatient rehabilitation setting. Patients would be expected to lose or gain function based on the order of difficulty, but this remains to be confirmed. Among the 6 activities of daily living tested here, their order from easiest to most difficult is eating, maintaining continence, transferring, toileting, dressing, and bathing. In addition, the index formed by these 6 items has construct validity in the nursing facility population.
Roy, Lumbini; Biswas, Taposh Kumar; Chowdhury, Mahbub Elahi
2017-01-01
Signal functions for emergency obstetric and newborn care (EmONC) are the major interventions for averting maternal and neonatal mortalities. Readiness of the facilities is essential to provide all the basic and comprehensive signal functions for EmONC to ensure emergency services from the designated facilities. The study assessed population coverage and availability of EmONC services in public and private facilities in Bangladesh. An assessment was conducted in all the public and private facilities providing obstetric care in to in-patients 24 districts. Data were collected on the performance of signal functions for EmONC from the study facilities in the last three months prior to the date of assessment. Trained data-collectors interviewed the facility managers and key service providers, along with review of records, using contextualized tools. Population coverage of signal functions was assessed by estimating the number of facilities providing the signal functions for EmONC compared to the United Nations requirements. Availability was assessed in terms of the proportion of facilities providing the services by type of facilities and by district. Caesarean section (CS) delivery and blood transfusion (BT) services (the two major components of comprehensive EmONC) were respectively available in 6.4 (0.9 public and 5.5 private) and 5.6 (1.3 public and 4.3 private) facilities per 500,000 population. The signal functions for basic EmONC, except two (parental anticonvulsants and assisted vaginal delivery), were available in a minimum of 5 facilities (public and private sectors combined) per 500,000 population. A major inter-district variation in the availability of signal functions was observed in each public- and private-sector facility. Among the various types of facilities, only the public medical college hospitals had all the signal functions. The situation was poor in other public facilities at the district and sub-district levels as well as in private facilities. In the public sector, CS delivery and BT services were available in the minimum required number of facilities. However, to ensure basic EmONC services, participation of the private sector is necessary. Public-private partnership should be promoted for nationwide coverage of signal functions for EmONC in Bangladesh.
Sanford Underground Research Facility - The United State's Deep Underground Research Facility
NASA Astrophysics Data System (ADS)
Vardiman, D.
2012-12-01
The 2.5 km deep Sanford Underground Research Facility (SURF) is managed by the South Dakota Science and Technology Authority (SDSTA) at the former Homestake Mine site in Lead, South Dakota. The US Department of Energy currently supports the development of the facility using a phased approach for underground deployment of experiments as they obtain an advanced design stage. The geology of the Sanford Laboratory site has been studied during the 125 years of operations at the Homestake Mine and more recently as part of the preliminary geotechnical site investigations for the NSF's Deep Underground Science and Engineering Laboratory project. The overall geology at DUSEL is a well-defined stratigraphic sequence of schist and phyllites. The three major Proterozoic units encountered in the underground consist of interbedded schist, metasediments, and amphibolite schist which are crosscut by Tertiary rhyolite dikes. Preliminary geotechnical site investigations included drift mapping, borehole drilling, borehole televiewing, in-situ stress analysis, laboratory analysis of core, mapping and laser scanning of new excavations, modeling and analysis of all geotechnical information. The investigation was focused upon the determination if the proposed site rock mass could support the world's largest (66 meter diameter) deep underground excavation. While the DUSEL project has subsequently been significantly modified, these data are still available to provide a baseline of the ground conditions which may be judiciously extrapolated throughout the entire Proterozoic rock assemblage for future excavations. Recommendations for facility instrumentation and monitoring were included in the preliminary design of the DUSEL project design and include; single and multiple point extensometers, tape extensometers and convergence measurements (pins), load cells and pressure cells, smart cables, inclinometers/Tiltmeters, Piezometers, thermistors, seismographs and accelerometers, scanners (laser/LIDAR), surveying instruments, and surveying benchmarks and optical survey points. Currently an array of single and multipoint extensometers monitors the Davis Campus. A facility-wide micro seismic monitoring system is anticipated to be deployed during the latter half of 2012. This system is designed to monitor minor events initiated within the historical mined out portions of the facility. The major science programs for the coming five years consist of the MAJORANA DEMONSTRATOR (MJD) neutrinoless double beta decay experiment; the Large Underground Xenon (LUX) dark matter search, the Center for Ultralow Background Experiments at DUSEL (CUBED), numerous geoscience installations, Long-Baseline Neutrino Experiment (LBNE), a nuclear astrophysics program involving a low energy underground particle accelerator, second and third generation dark matter experiments, and additional low background counting facilities. The Sanford Lab facility is an active, U.S. based, deep underground research facility dedicated to science, affording the science community the opportunity to conduct unprecedented scientific research in a broad range of physics, biology and geoscience fields at depth. SURF is actively interested in hosting additional research collaborations and provides resources for full facility design, cost estimation, excavation, construction and support management services.
Health sciences libraries in Kuwait: a study of their resources, facilities, and services
Al-Ansari, Husain A.; Al-Enezi, Sana
2001-01-01
The purpose of this study was to examine the current status of health sciences libraries in Kuwait in terms of their staff, collections, facilities, use of information technology, information services, and cooperation. Seventeen libraries participated in the study. Results show that the majority of health sciences libraries were established during the 1980s. Their collections are relatively small. The majority of their staff is nonprofessional. The majority of libraries provide only basic information services. Cooperation among libraries is limited. Survey results also indicate that a significant number of health sciences libraries are not automated. Some recommendations for the improvement of existing resources, facilities, and services are made. PMID:11465688
An evaluation of cold chain system for vaccines in Bangalore.
Sudarshan, M K; Sundar, M; Girish, N; Narendra, S; Patel, N G
1994-01-01
The cold chain plays a major role in the universal immunization programme which helps in preventing against six major killer diseases in children. We collected 144 study samples randomly from different parts of Bangalore to know the training status of personnel, refrigeration facilities, storage, monitoring and potency of vaccines. It was observed that 6.6% of general practitioners were trained under Universal Immunization Programme, monitoring was not satisfactory, and two of the OPV samples from medical practitioners had an unsatisfactory titre dose. Comprehensive orientation/training on cold chain is essential for medical practitioners and other professionals.
NASA Technical Reports Server (NTRS)
1978-01-01
The Mission Control Center Shuttle (MCC) Shuttle Orbital Flight Test (OFT) Data System (OFTDS) provides facilities for flight control and data systems personnel to monitor and control the Shuttle flights from launch (tower clear) to rollout (wheels stopped on runway). It also supports the preparation for flight (flight planning, flight controller and crew training, and integrated vehicle and network testing activities). The MCC Shuttle OFTDS is described in detail. Three major support systems of the OFTDS and the data types and sources of data entering or exiting the MCC were illustrated. These systems are the communication interface system, the data computation complex, and the display and control system.
Cupertino, A Paula; Hunt, Jamie J; Gajewski, Byron J; Jiang, Yu; Marquis, Janet; Friedmann, Peter D; Engelman, Kimberly K; Richter, Kimber P
2013-03-15
Quitting smoking improves health and drug use outcomes among people in treatment for substance abuse. The twofold purpose of this study is to describe tobacco treatment provision across a representative sample of U.S. facilities and to use these data to develop the brief Index of Tobacco Treatment Quality (ITTQ). We constructed survey items based on current tobacco treatment guidelines, existing surveys, expert input, and qualitative research. We administered the survey to a stratified sample of 405 facility administrators selected from all 3,800 U.S. adult outpatient facilities listed in the SAMHSA Inventory of Substance Abuse Treatment Services. We constructed the ITTQ with a subset of 7 items that have the strongest clinical evidence for smoking cessation. Most facilities (87.7%) reported that a majority of their clients were asked if they smoke cigarettes. Nearly half of facilities (48.6%) reported that a majority of their smoking clients were advised to quit. Fewer (23.3%) reported that a majority of their smoking clients received tobacco treatment counseling and even fewer facilities (18.3%) reported a majority of their smoking clients were advised to use quit smoking medications. The median facility ITTQ score was 2.57 (on a scale of 1-5) and the ITTQ displayed good internal consistency (Cronbach's alpha = .844). Moreover, the ITTQ had substantial test-retest reliability (.856), and ordinal confirmatory factor analysis found that our one-factor model for ITTQ fit the data very well with a CFI of 0.997 and an RMSEA of 0.042. The ITTQ is a brief and reliable tool for measuring tobacco treatment quality in substance abuse treatment facilities. Given the clear-cut room for improvement in tobacco treatment, the ITTQ could be an important tool for quality improvement by identifying service levels, facilitating goal setting, and measuring change.
2013-01-01
Background Quitting smoking improves health and drug use outcomes among people in treatment for substance abuse. The twofold purpose of this study is to describe tobacco treatment provision across a representative sample of U.S. facilities and to use these data to develop the brief Index of Tobacco Treatment Quality (ITTQ). Methods We constructed survey items based on current tobacco treatment guidelines, existing surveys, expert input, and qualitative research. We administered the survey to a stratified sample of 405 facility administrators selected from all 3,800 U.S. adult outpatient facilities listed in the SAMHSA Inventory of Substance Abuse Treatment Services. We constructed the ITTQ with a subset of 7 items that have the strongest clinical evidence for smoking cessation. Results Most facilities (87.7%) reported that a majority of their clients were asked if they smoke cigarettes. Nearly half of facilities (48.6%) reported that a majority of their smoking clients were advised to quit. Fewer (23.3%) reported that a majority of their smoking clients received tobacco treatment counseling and even fewer facilities (18.3%) reported a majority of their smoking clients were advised to use quit smoking medications. The median facility ITTQ score was 2.57 (on a scale of 1–5) and the ITTQ displayed good internal consistency (Cronbach’s alpha = .844). Moreover, the ITTQ had substantial test-retest reliability (.856), and ordinal confirmatory factor analysis found that our one-factor model for ITTQ fit the data very well with a CFI of 0.997 and an RMSEA of 0.042. Conclusions The ITTQ is a brief and reliable tool for measuring tobacco treatment quality in substance abuse treatment facilities. Given the clear-cut room for improvement in tobacco treatment, the ITTQ could be an important tool for quality improvement by identifying service levels, facilitating goal setting, and measuring change. PMID:23497366
NASA Technical Reports Server (NTRS)
Congo, Richard T.
1990-01-01
As the Space Station nears reality in funding support from Congress, NASA plans to perform over a hundred different missions in the coming decade. Incrementally deployed, the Space Station will evolve into modules linked to an integral structure. Each module will have characteristic functions, such as logistics, habitation, and materials processing. Because the Space Station is to be user friendly for experimenters, NASA is anticipating that a variety of different chemicals will be taken on-board. Accidental release of these potentially toxic chemicals and their chemical compatibility is the focus of this discourse. The Microgravity Manufacturing Processing Facility (MMPF) will contain the various facilities within the U.S. Laboratory (USL). Each facility will have a characteristic purpose, such as alloy solidification or vapor crystal growth. By examining the proposed experiments for each facility, identifying the chemical constituents, their physical state and/or changes, byproducts and effluents, those payloads can be identified which may contain toxic, explosive, or reactive compounds that require processing or containment in mission peculiar waste management systems. Synergistic reactions from mixed effluent streams is of major concern. Each experiment will have it own data file, complete with schematic, chemical listing, physical data, etc. Chemical compatibility information from various databases will provide assistance in the analysis of alternate disposal techniques (pretreatment, separate storage, etc.). Along with data from the Risk Analysis of the Proposed USL Waste Management System, accidental release of potentially toxic and catastrophic chemicals would be eliminated or reduced.
1999-02-06
Cradled in the cargo hold of a tractor-trailer rig called the Space Cargo Transportation System, the Chandra X-ray Observatory reaches the Vertical Processing Facility (VPF). Chandra arrived at the Shuttle Landing Facility on Thursday, Feb. 4, aboard an Air Force C-5 Galaxy aircraft. In the VPF, the telescope will undergo final installation of associated electronic components; it will also be tested, fueled and mated with the Inertial Upper Stage booster. A set of integrated tests will follow. Chandra is scheduled for launch July 9 aboard Space Shuttle Columbia, on mission STS-93 . Formerly called the Advanced X-ray Astrophysics Facility, Chandra comprises three major elements: the spacecraft, the science instrument module (SIM), and the world's most powerful X-ray telescope. Chandra will allow scientists from around the world to see previously invisible black holes and high-temperature gas clouds, giving the observatory the potential to rewrite the books on the structure and evolution of our universe
1999-02-06
Cradled in the cargo hold of a tractor-trailer rig called the Space Cargo Transportation System, the Chandra X-ray Observatory waits to be moved inside the Vertical Processing Facility (VPF). Chandra arrived at the Shuttle Landing Facility on Thursday, Feb. 4, aboard an Air Force C-5 Galaxy aircraft. In the VPF, the telescope will undergo final installation of associated electronic components; it will also be tested, fueled and mated with the Inertial Upper Stage booster. A set of integrated tests will follow. Chandra is scheduled for launch July 9 aboard Space Shuttle Columbia, on mission STS-93 . Formerly called the Advanced X-ray Astrophysics Facility, Chandra comprises three major elements: the spacecraft, the science instrument module (SIM), and the world's most powerful X-ray telescope. Chandra will allow scientists from around the world to see previously invisible black holes and high-temperature gas clouds, giving the observatory the potential to rewrite the books on the structure and evolution of our universe
National facilities study. Volume 5: Space research and development facilities task group
NASA Technical Reports Server (NTRS)
1994-01-01
With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R&D facilities planning for the U.S., and these are discussed in Section 4 of this volume.
Atela, Martin; Bakibinga, Pauline; Ettarh, Remare; Kyobutungi, Catherine; Cohn, Simon
2015-12-04
Enhancing accountability in health systems is increasingly emphasised as crucial for improving the nature and quality of health service delivery worldwide and particularly in developing countries. Accountability mechanisms include, among others, health facilities committees, suggestion boxes, facility and patient charters. However, there is a dearth of information regarding the nature of and factors that influence the performance of accountability mechanisms, especially in developing countries. We examine community members' experiences of one such accountability mechanism, the health facility charter in Kericho District, Kenya. A household survey was conducted in 2011 among 1,024 respondents (36% male, 64% female) aged 17 years and above stratified by health facility catchment area, situated in a division in Kericho District. In addition, sixteen focus group discussions were conducted with health facility users in the four health facility catchment areas. Quantitative data were analysed through frequency distributions and cross-tabulations. Qualitative data were transcribed and analysed using a thematic approach. The majority (65%) of household survey respondents had seen their local facility service charter, 84% of whom had read the information on the charter. Of these, 83% found the charter to be useful or very useful. According to the respondents, the charters provided useful information about the services offered and their costs, gave users a voice to curb potential overcharging and helped users plan their medical expenses before receiving the service. However, community members cited several challenges with using the charters: non-adherence to charter provisions by health workers; illegibility and language issues; lack of expenditure records; lack of time to read and understand them, often due to pressures around queuing; and socio-cultural limitations. Findings from this study suggest that improving the compliance of health facilities in districts across Kenya with regard to the implementation of the facility service charter is critical for accountability and community satisfaction with service delivery. To improve the compliance of health facilities, attention needs to be focused on mechanisms that help enforce official guidelines, address capacity gaps, and enhance public awareness of the charters and their use.
Mounier-Jack, Sandra; Burchett, Helen Elizabeth Denise; Griffiths, Ulla Kou; Konate, Mamadou; Diarra, Kassibo Sira
2014-01-01
Objective: To evaluate the impact of the meningococcal A (MenA) vaccine introduction in Mali through mass campaigns on the routine immunization program and the wider health system. Methods: We used a mixed-methods case-study design, combining semi-structured interviews with 31 key informants, a survey among 18 health facilities, and analysis of routine health facility data on number of routine vaccinations and antenatal consultations before, during, and after the MenA vaccine campaign in December 2010. Survey and interview data were collected at the national level and in 2 regions in July and August 2011, with additional interviews in January 2012. Findings: Many health system functions were not affected—either positively or negatively—by the MenA vaccine introduction. The majority of effects were felt on the immunization program. Benefits included strengthened communication and social mobilization, surveillance, and provider skills. Drawbacks included the interruption of routine vaccination services in the majority of health facilities surveyed (67%). The average daily number of children receiving routine vaccinations was 79% to 87% lower during the 10-day campaign period than during other periods of the month. Antenatal care consultations were also reduced during the campaign period by 10% to 15%. Key informants argued that, with an average of 14 campaigns per year, mass campaigns would have a substantial cumulative negative effect on routine health services. Many also argued that the MenA campaign missed potential opportunities for health systems strengthening because integration with other health services was lacking. Conclusion: The MenA vaccine introduction interrupted routine vaccination and other health services. When introducing a new vaccine through a campaign, coverage of routine health services should be monitored alongside campaign vaccine coverage to highlight where and how long services are disrupted and to mitigate risks to routine services. PMID:25276567
Suzuki, Kazumichi; Gillin, Michael T; Sahoo, Narayan; Zhu, X Ronald; Lee, Andrew K; Lippy, Denise
2011-07-01
To evaluate patient census, equipment clinical availability, maximum daily treatment capacity, use factor for major beam delivery parameters, and treatment process time for actual treatments delivered by proton therapy systems. The authors have been recording all beam delivery parameters, including delivered dose, energy, range, spread-out Bragg peak widths, gantry angles, and couch angles for every treatment field in an electronic medical record system. We analyzed delivery system downtimes that had been recorded for every equipment failure and associated incidents. These data were used to evaluate the use factor of beam delivery parameters, the size of the patient census, and the equipment clinical availability of the facility. The duration of each treatment session from patient walk-in and to patient walk-out of the treatment room was measured for 82 patients with cancers at various sites. The yearly average equipment clinical availability in the last 3 yrs (June 2007-August 2010) was 97%, which exceeded the target of 95%. Approximately 2200 patients had been treated as of August 2010. The major disease sites were genitourinary (49%), thoracic (25%), central nervous system (22%), and gastrointestinal (2%). Beams have been delivered in approximately 8300 treatment fields. The use factor for six beam delivery parameters was also evaluated. Analysis of the treatment process times indicated that approximately 80% of this time was spent for patient and equipment setup. The other 20% was spent waiting for beam delivery and beam on. The total treatment process time can be expressed by a quadratic polynomial of the number of fields per session. The maximum daily treatment capacity of our facility using the current treatment processes was estimated to be 133 +/- 35 patients. This analysis shows that the facility has operated at a high performance level and has treated a large number of patients with a variety of diseases. The use factor of beam delivery parameters varies by disease site. Further improvements in efficiency may be realized in the equipment- and patient-related processes of treatment.
Sandia 25-meter compressed helium/air gun
NASA Astrophysics Data System (ADS)
Setchell, R. E.
1982-04-01
For nearly twenty years the Sandia 25-meter compressed gas gun has been an important tool for studying condensed materials subjected to transient shock compression. Major system modifications are now in progress to provide new control, instrumentation, and data acquisition capabilities. These features will ensure that the facility can continue as an effective means of investigating a variety of physical and chemical processes in shock-compressed solids.
ERIC Educational Resources Information Center
Gosman, Minna L.
Developed as a result of an analysis of the task of transcribing as practiced in a health facility, this study guide was designed to teach the knowledge and skills required of a medical transcriber. The medical record department was identified as a major occupational area, and a task inventory for medical records was developed and used as a basis…
Capezza, Nicole M; Najavits, Lisa M
2012-04-01
Trauma-informed treatment increasingly is recognized as an important component of service delivery. This study examined differences in treatment-related characteristics of facilities that offer moderate or high levels of trauma-informed counseling versus those that offer no or low levels of such counseling. Responses from 13,223 substance abuse treatment facilities surveyed in 2009 by the National Survey of Substance Abuse Treatment Services (NSSATS) were used. A majority (66.6%) of facilities reported using trauma counseling sometimes or always or often. Facilities that provided moderate or high levels of trauma counseling were more likely to provide additional treatment services, such as disease testing and specialized group therapy, as well as child care, employment counseling, and other ancillary services. A majority of facilities reported provision of trauma counseling. Additional training and resources may be needed for programs that reported low rates of trauma counseling.
Burke, Thomas F; Hines, Rosemary; Ahn, Roy; Walters, Michelle; Young, David; Anderson, Rachel Eleanor; Tom, Sabrina M; Clark, Rachel; Obita, Walter; Nelson, Brett D
2014-01-01
Objective Injuries, trauma and non-communicable diseases are responsible for a rising proportion of death and disability in low-income and middle-income countries. Delivering effective emergency and urgent healthcare for these and other conditions in resource-limited settings is challenging. In this study, we sought to examine and characterise emergency and urgent care capacity in a resource-limited setting. Methods We conducted an assessment within all 30 primary and secondary hospitals and within a stratified random sampling of 30 dispensaries and health centres in western Kenya. The key informants were the most senior facility healthcare provider and manager available. Emergency physician researchers utilised a semistructured assessment tool, and data were analysed using descriptive statistics and thematic coding. Results No lower level facilities and 30% of higher level facilities reported having a defined, organised approach to trauma. 43% of higher level facilities had access to an anaesthetist. The majority of lower level facilities had suture and wound care supplies and gloves but typically lacked other basic trauma supplies. For cardiac care, 50% of higher level facilities had morphine, but a minority had functioning ECG, sublingual nitroglycerine or a defibrillator. Only 20% of lower level facilities had glucometers, and only 33% of higher level facilities could care for diabetic emergencies. No facilities had sepsis clinical guidelines. Conclusions Large gaps in essential emergency care capabilities were identified at all facility levels in western Kenya. There are great opportunities for a universally deployed basic emergency care package, an advanced emergency care package and facility designation scheme, and a reliable prehospital care transportation and communications system in resource-limited settings. PMID:25260371
The nature and prevalence of psychiatric disorders in a Sudanese juvenile correctional facility
Awadelkarim, Mohamed Ali
2016-01-01
High morbidity of mental disorders among juvenile offenders has been confirmed by several studies, thus challenging both the juvenile justice system and the mental health system. Data from developed countries may not reflect the situation in low-income countries and therefore cannot form a basis for intervention. No similar study has been done in Sudan. The objective to determine prevalence of psychiatric disorders among incarcerated youth in Al-Juref juvenile correctional facility. All juveniles (forty eight) were studied utilizing a descriptive cross-sectional study design. Data was collected using a socio-demographic questionnaire and the MINI-KID 6.0 and was analyzed using the SPSS v.20. Most respondents were males (Forty six) with a mean age of fifteen (±1.6 years SD). Most were living with both parents (75%) and were school dropouts (41.7%). The majority was arrested for theft (33.3%) and rape (29.2%). Prevalence of psychiatric disorders was high (60.4%) with conduct disorder (CD) being the most common (47.9%), followed by anxiety disorders (31.1%) and major depressive disorder (14.6%). Comorbid psychiatric disorders rate was high (31%). Even after subtracting CD, prevalence was still common (39%). New information can help mental health providers and policy makers in the juvenile justice system make effective interventions in provision of mental health services. We recommend clinical assessment for juveniles when they appear at court and training of workers in the justice system on how to detect features of psychopathology. PMID:28096556
Measures for simulator evaluation of a helicopter obstacle avoidance system
NASA Technical Reports Server (NTRS)
Demaio, Joe; Sharkey, Thomas J.; Kennedy, David; Hughes, Micheal; Meade, Perry
1993-01-01
The U.S. Army Aeroflightdynamics Directorate (AFDD) has developed a high-fidelity, full-mission simulation facility for the demonstration and evaluation of advanced helicopter mission equipment. The Crew Station Research and Development Facility (CSRDF) provides the capability to conduct one- or two-crew full-mission simulations in a state-of-the-art helicopter simulator. The CSRDF provides a realistic, full field-of-regard visual environment with simulation of state-of-the-art weapons, sensors, and flight control systems. We are using the CSRDF to evaluate the ability of an obstacle avoidance system (OASYS) to support low altitude flight in cluttered terrain using night vision goggles (NVG). The OASYS uses a laser radar to locate obstacles to safe flight in the aircraft's flight path. A major concern is the detection of wires, which can be difficult to see with NVG, but other obstacles--such as trees, poles or the ground--are also a concern. The OASYS symbology is presented to the pilot on a head-up display mounted on the NVG (NVG-HUD). The NVG-HUD presents head-stabilized symbology to the pilot while allowing him to view the image intensified, out-the-window scene through the HUD. Since interference with viewing through the display is a major concern, OASYS symbology must be designed to present usable obstacle clearance information with a minimum of clutter.
NASA Astrophysics Data System (ADS)
Luo, Y.; Huang, Y.; Jiang, J.; MA, S.; Saruta, V.; Liang, G.; Hanson, P. J.; Ricciuto, D. M.; Milcu, A.; Roy, J.
2017-12-01
The past two decades have witnessed rapid development in sensor technology. Built upon the sensor development, large research infrastructure facilities, such as National Ecological Observatory Network (NEON) and FLUXNET, have been established. Through networking different kinds of sensors and other data collections at many locations all over the world, those facilities generate large volumes of ecological data every day. The big data from those facilities offer an unprecedented opportunity for advancing our understanding of ecological processes, educating teachers and students, supporting decision-making, and testing ecological theory. The big data from the major research infrastructure facilities also provides foundation for developing predictive ecology. Indeed, the capability to predict future changes in our living environment and natural resources is critical to decision making in a world where the past is no longer a clear guide to the future. We are living in a period marked by rapid climate change, profound alteration of biogeochemical cycles, unsustainable depletion of natural resources, and deterioration of air and water quality. Projecting changes in future ecosystem services to the society becomes essential not only for science but also for policy making. We will use this panel format to outline major opportunities and challenges in integrating research infrastructure and ecosystem models toward developing predictive ecology. Meanwhile, we will also show results from an interactive model-experiment System - Ecological Platform for Assimilating Data into models (EcoPAD) - that have been implemented at the Spruce and Peatland Responses Under Climatic and Environmental change (SPRUCE) experiment in Northern Minnesota and Montpellier Ecotron, France. EcoPAD is developed by integrating web technology, eco-informatics, data assimilation techniques, and ecosystem modeling. EcoPAD is designed to streamline data transfer seamlessly from research infrastructure facilities to model simulation, data assimilation, and ecological forecasting.
This asset includes the EPA Federal Agency Hazardous Waste Compliance Docket (Docket), which is required by Section 120(c) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). The Docket contains information reported to EPA by federal facilities that manage hazardous waste or from which hazardous substances, pollutants or contaminants have been or may be released. The Docket serves three major purposes:1. To identify all federal facilities that must be evaluated through the site assessment process to determine whether they pose a risk to human health and the environment sufficient to warrant inclusion on the National Priorities List (NPL); 2. To compile and maintain the information submitted to EPA on such facilities under the provisions listed in section 120(c) of CERCLA; and3. To provide a mechanism to make the information available to the public.The docket includes facilities which have provided information to EPA through documents such as reports under a Federal agency environmental restoration program, regardless of the absence of section 103 reporting. E-Docket is an internal business management tool that will improve the tracking and record keeping of information about facilities that have been identified as potential Docket sites. The functionality of the system is basic record tracking, and it will contain a list of draft proposed facilities which can be sorted based on Agency ownership, region, or status (Draft Propose
Waldner, Cheryl L
2008-01-01
During the late part of 2000 and early months of 2001, project veterinarians recruited 205 beef herds to participate in a study of the effects of emissions from the upstream oil and gas industry on cattle reproduction and health. Researchers developed herd-selection criteria to optimize the range of exposure to facilities, including oil and gas wells, battery sites, and gas-gathering and gas-processing facilities across the major cattle-producing areas of Western Canada. Herds were initially selected on the basis of a ranking system of exposure potential on the basis of herd-owner reports of the locations of their operations in relation to oil and gas industry facilities. At the end of the study, researchers summarized data obtained from provincial regulatory agencies on facility location and reported flaring and venting volumes for each herd and compared these data to the original rankings of herd-exposure potential. Through this selection process, the researchers were successful in obtaining statistically significant differences in exposure to various types of oil and gas facility types and reported emissions among herds recruited for the study.
Estimating farm-gate ammonia emissions from major animal production systems in China
NASA Astrophysics Data System (ADS)
Gao, Zhiling; Ma, Wenqi; Zhu, Gaodi; Roelcke, Marco
2013-11-01
Ammonia (NH3) emissions from livestock production in China are an important contributor to the global NH3 budget. In this study, by estimating total nitrogen (N) intake based on herd structures and excreted N, a mass balance model was used to estimate NH3 losses from animal housing and manure storage facilities of dairy cattle, beef cattle, pigs, broiler and layer productions within animal farm gate and their corresponding NH3 emission intensities on the basis of animal products, N and protein in animal products. In 2009, NH3 emissions from pigs, layers, beef and dairy cattle and broiler production systems in China were 1.23, 0.52, 0.24, 0.21 and 0.09 million tons, respectively. The NH3 emission intensities were 26.6 g NH3-N kg-1 of pork, 28.1 g NH3-N kg-1 of layer eggs, 39.4 g NH3-N kg-1 of beef meat, 6.0 g NH3-N kg-1 of dairy milk and 4.6 g NH3-N kg-1 of chicken meat, or 1260 (pigs), 1514 (layers), 1297 (beef), 1107 (dairy) and 123 g NH3-N (broilers) kg-1 N in animal products. Of the sectors of NH3 emission, manure storage facilities and farmyard manure (FYM) in animal housing were the major contributors to the total NH3 emissions except for layers; housing emissions from slurry were also major contributors for dairy and pig production.
A Unique Software System For Simulation-to-Flight Research
NASA Technical Reports Server (NTRS)
Chung, Victoria I.; Hutchinson, Brian K.
2001-01-01
"Simulation-to-Flight" is a research development concept to reduce costs and increase testing efficiency of future major aeronautical research efforts at NASA. The simulation-to-flight concept is achieved by using common software and hardware, procedures, and processes for both piloted-simulation and flight testing. This concept was applied to the design and development of two full-size transport simulators, a research system installed on a NASA B-757 airplane, and two supporting laboratories. This paper describes the software system that supports the simulation-to-flight facilities. Examples of various simulation-to-flight experimental applications were also provided.
Robotics control using isolated word recognition of voice input
NASA Technical Reports Server (NTRS)
Weiner, J. M.
1977-01-01
A speech input/output system is presented that can be used to communicate with a task oriented system. Human speech commands and synthesized voice output extend conventional information exchange capabilities between man and machine by utilizing audio input and output channels. The speech input facility is comprised of a hardware feature extractor and a microprocessor implemented isolated word or phrase recognition system. The recognizer offers a medium sized (100 commands), syntactically constrained vocabulary, and exhibits close to real time performance. The major portion of the recognition processing required is accomplished through software, minimizing the complexity of the hardware feature extractor.
Comparison of DOE and NIRMA approaches to configuration management programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yang, E.Y.; Kulzick, K.C.
One of the major management programs used for commercial, laboratory, and defense nuclear facilities is configuration management. The safe and efficient operation of a nuclear facility requires constant vigilance in maintaining the facility`s design basis with its as-built condition. Numerous events have occurred that can be attributed to (either directly or indirectly) the extent to which configuration management principles have been applied. The nuclear industry, as a whole, has been addressing this management philosophy with efforts taken on by its constituent professional organizations. The purpose of this paper is to compare and contrast the implementation plans for enhancing a configurationmore » management program as outlined in the U.S. Department of Energy`s (DOE`s) DOE-STD-1073-93, {open_quotes}Guide for Operational Configuration Management Program,{close_quotes} with the following guidelines developed by the Nuclear Information and Records Management Association (NIRMA): 1. PP02-1994, {open_quotes}Position Paper on Configuration Management{close_quotes} 2. PP03-1992, {open_quotes}Position Paper for Implementing a Configuration Management Enhancement Program for a Nuclear Facility{close_quotes} 3. PP04-1994 {open_quotes}Position Paper for Configuration Management Information Systems.{close_quotes}« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Herndon, J.N.
1992-12-31
The field of remote technology is continuing to evolve to support man`s efforts to perform tasks in hostile environments. The technology which we recognize today as remote technology has evolved over the last 45 years to support human operations in hostile environments such as nuclear fission and fusion, space, underwater, hazardous chemical, and hazardous manufacturing. The four major categories of approach to remote technology have been (1) protective clothing and equipment for direct human entry, (2) extended reach tools using distance for safety, (3) telemanipulators with barriers for safety, and (4) teleoperators incorporating mobility with distance and/or barriers for safety.more » The government and commercial nuclear industry has driven the development of the majority of the actual teleoperator hardware available today. This hardware has been developed largely due to the unsatisfactory performance of the protective-clothing approach in many hostile applications. Manipulation systems which have been developed include crane/impact wrench systems, unilateral power manipulators, mechanical master/slaves, and servomanipulators. Viewing systems have included periscopes, shield windows, and television systems. Experience over the past 45 years indicates that maintenance system flexibility is essential to typical repair tasks because they are usually not repetitive, structured, or planned. Fully remote design (manipulation, task provisions, remote tooling, and facility synergy) is essential to work task efficiency. Work for space applications has been primarily research oriented with relatively few successful space applications, although the shuttle`s remote manipulator system has been quite successful. In the last decade, underwater applications have moved forward significantly, with the offshore oil industry and military applications providing the primary impetus.« less
NASA Technical Reports Server (NTRS)
Dorais, Gregory A.
2015-01-01
This document defines the design concept for a ground-based, extended-stay hypergravity facility as a precursor for space-based artificial-gravity facilities that extend the permanent presence of both human and non-human life beyond Earth in artificial-gravity settlements. Since the Earth's current human population is stressing the environment and the resources off-Earth are relatively unlimited, by as soon as 2040 more than one thousand people could be living in Earthorbiting artificial-gravity habitats. Eventually, the majority of humanity may live in artificialgravity habitats throughout this solar system as well as others, but little is known about the longterm (multi-generational) effects of artificial-gravity habitats on people, animals, and plants. In order to extend life permanently beyond Earth, it would be useful to create an orbiting space facility that generates 1g as well as other gravity levels to rigorously address the numerous challenges of such an endeavor. Before doing so, developing a ground-based artificial-gravity facility is a reasonable next step. Just as the International Space Station is a microgravity research facility, at a small fraction of the cost and risk a ground-based artificial-gravity facility can begin to address a wide-variety of the artificial-gravity life-science questions and engineering challenges requiring long-term research to enable people, animals, and plants to live off-Earth indefinitely.
Computer assisted operations in Petroleum Development Oman (PDO)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Al-Hinai, S.H.; Mutimer, K.
1995-10-01
Petroleum Development Oman (PDO) currently produces some 750,000 bopd and 900,000 bwpd from some 74 fields in a large geographical area and diverse operating conditions. A key corporate objective is to reduce operating costs by exploiting productivity gains from proven technology. Automation is seen as a means of managing the rapid growth of well population and production facilities. the overall objective is to improve field management through continuous monitoring of wells and facilities and dissemination of data throughout the whole organization. A major upgrade of PDO`s field Supervisory Control and Data Acquisition (SCADA) system is complete providing a platform tomore » exploit new initiatives particularly for production optimization of artificial lift systems and automatic well testing using multi selector valves, coriolis flow meter measurements and multi component (oil, gas, water) flowmeter. The paper describes PDO`s experience including benefits and challenges which have to be managed when developing Computer Assisted Operations (CAO).« less
Security basics for long-term care facilities.
Green, Martin
2015-01-01
The need for Long-Term Care (LTC) facilities is growing, the author reports, and along with it the need for programs to address the major security concerns of such facilities. In this article he explains how to apply the IAHSS Healthcare Security Industry Guidelines and the Design Guidelines to achieve a safer LTC facility.
New Mexico's Model for Funding School Facilities' Greatest Needs
ERIC Educational Resources Information Center
Gorrell, Robert; Salamone, Frank
2011-01-01
The New Mexico Public Schools Facilities Authority (NM-PSFA) is a relatively small state agency (50 staff members) that manages the allocation of funding for public school facilities in the state while assisting school districts and state-chartered charter schools in facility planning, construction, and maintenance. Like the majority of other…
Microcosm to Cosmos: The Growth of a Divisional Computer Network
Johannes, R.S.; Kahane, Stephen N.
1987-01-01
In 1982, we reported the deployment of a network of microcomputers in the Division of Gastroenterology[1]. This network was based upon Corvus Systems Omninet®. Corvus was one of the very first firms to offer networking products for PC's. This PC development occurred coincident with the planning phase of the Johns Hopkins Hospital's multisegment ethernet project. A rich communications infra-structure is now in place at the Johns Hopkins Medical Institutions[2,3]. Shortly after the hospital development under the direction of the Operational and Clinical Systems Division (OCS) development began, the Johns Hopkins School of Medicine began an Integrated Academic Information Management Systems (IAIMS) planning effort. We now present a model that uses aspects of all three planning efforts (PC networks, Hospital Information Systems & IAIMS) to build a divisional computing facility. This facility is viewed as a terminal leaf on then institutional network diagram. Nevertheless, it is noteworthy that this leaf, the divisional resource in the Division of Gastroenterology (GASNET), has a rich substructure and functionality of its own, perhaps revealing the recursive nature of network architecture. The current status, design and function of the GASNET computational facility is discussed. Among the major positive aspects of this design are the sharing and centralization of MS-DOS software, the high-speed DOS/Unix link that makes available most of the our institution's computing resources.
Tang, Liyang
2012-09-14
Patient's satisfaction with medical service delivery/assessment of medical service/trust in health delivery system may have significant influence on patient's life satisfaction in China's health delivery system/in various kinds of hospitals.The aim of this study was to test whether and to what extent patient's satisfaction with medical service delivery/patient's assessments of various major aspects of medical service/various major aspects of patient's trust in health delivery system influenced patient's life satisfaction in China's health delivery system/in various kinds of hospitals. This study collaborated with National Bureau of Statistics of China to carry out a 2008 national urban resident household survey in 17 provinces, autonomous regions, and municipalities directly under the central government (N = 3,386), and specified ordered probit models were established to analyze dataset from this household survey. The key considerations in generating patient's life satisfaction involved patient's overall satisfaction with medical service delivery, assessment of doctor-patient communication, assessment of medical cost, assessment of medical treatment process, assessment of medical facility and hospital environment, assessment of waiting time for medical service, trust in prescription, trust in doctor, and trust in recommended medical examination. But the major considerations in generating patient's life satisfaction were different among low level public hospital, high level public hospital, and private hospital. The promotion of patient's overall satisfaction with medical service delivery, the improvement of doctor-patient communication, the reduction of medical cost, the improvement of medical treatment process, the promotion of medical facility and hospital environment, the reduction of waiting time for medical service, the promotion of patient's trust in prescription, the promotion of patient's trust in doctor, and the promotion of patient's trust in recommended medical examination could all help promote patient's life satisfaction. But their promotion effects were different among low level public hospital, high level public hospital, and private hospital.
Major Incident Hospital: Development of a Permanent Facility for Management of Incident Casualties.
Marres, Geertruid; Bemelman, Michael; van der Eijk, John; Leenen, Luke
2009-06-01
Preparation is essential to cope with the challenge of providing optimal care when there is a sudden, unexpected surge of casualties due to a disaster or major incident. By definition, the requirements of such cases exceed the standard care facilities of hospitals in qualitative or quantitative respects and interfere with the care of regular patients. To meet the growing demands to be prepared for disasters, a permanent facility to provide structured, prepared relief in such situations was developed. A permanent but reserved Major Incident Hospital (MIH) has been developed through cooperation between a large academic medical institution, a trauma center, a military hospital, and the National Poison Information Centre (NVIC). The infrastructure, organization, support systems, training and systematic working methods of the MIH are designed to create order in a chaotic, unexpected situation and to optimize care and logistics in any possible scenario. Focus points are: patient flow and triage, registration, communication, evaluation and training. Research and the literature are used to identify characteristic pitfalls due to the chaos associated with and the unexpected nature of disasters, and to adapt our organization. At the MIH, the exceptional has become the core business, and preparation for disaster and large-scale emergency care is a daily occupation. An Emergency Response Protocol enables admittance to the normally dormant hospital of up to 100 (in exceptional cases even 300) patients after a start-up time of only 15 min. The Patient Barcode Registration System (PBR) with EAN codes guarantees quick and adequate registration of patient data in order to facilitate good medical coordination and follow-up during a major incident. The fact that the hospital is strictly reserved for this type of care guarantees availability and minimizes impact on normal care. When it is not being used during a major incident, there is time to address training and research. Collaboration with the NVIC and infrastructural adjustments enable us to not only care for patients with physical trauma, but also to provide centralized care of patients under quarantine conditions for, say, MRSA, SARS, smallpox, chemical or biological hazards. Triage plays an important role in medical disaster management and is therefore key to organization and infrastructure. Caps facilitate role distribution and recognizibility. The PBR resulted in more accurate registration and real-time availability of patient and group information. Infrastructure and a plan is not enough; training, research and evaluation are necessary to continuously work on disaster preparedness. The MIH in Utrecht (Netherlands) is a globally unique facility that can provide immediate emergency care for multiple casualties under exceptional circumstances. Resulting from the cooperation between a large academic medical institution, a trauma center, a military hospital and the NVIC, the MIH offers not only a good and complete infrastructure but also the expertise required to provide large-scale emergency care during disasters and major incidents.
The load shedding advisor: An example of a crisis-response expert system
NASA Technical Reports Server (NTRS)
Bollinger, Terry B.; Lightner, Eric; Laverty, John; Ambrose, Edward
1987-01-01
A Prolog-based prototype expert system is described that was implemented by the Network Operations Branch of the NASA Goddard Space Flight Center. The purpose of the prototype was to test whether a small, inexpensive computer system could be used to host a load shedding advisor, a system which would monitor major physical environment parameters in a computer facility, then recommend appropriate operator reponses whenever a serious condition was detected. The resulting prototype performed significantly to efficiency gains achieved by replacing a purely rule-based design methodology with a hybrid approach that combined procedural, entity-relationship, and rule-based methods.
Naval Research Laboratory Major Facilities 2008
2008-10-01
Development Laboratory • Secure Supercomputing Facility • CBD/Tilghman Island IR Field Evaluation Facility • Ultra-Short-Pulse Laser Effects Research...EMI Test Facility • Proximity Operations Testbed GENERAL INFORMATION • Maps EX EC U TI V E D IR EC TO RA TE Code 1100 – Institute for Nanoscience...facility: atomic force microscope (AFM); benchtop transmission electron microscope (TEM); cascade probe station; critical point dryer ; dual beam focused
Energy System Integration Facility Secure Data Center | Energy Systems
Integration Facility | NREL Energy System Integration Facility Secure Data Center Energy System Integration Facility Secure Data Center The Energy Systems Integration Facility's Secure Data Center provides
Real-time data system: Incorporating new technology in mission critical environments
NASA Technical Reports Server (NTRS)
Muratore, John F.; Heindel, Troy A.
1990-01-01
If the Space Station Freedom is to remain viable over its 30-year life span, it must be able to incorporate new information systems technologies. These technologies are necessary to enhance mission effectiveness and to enable new NASA missions, such as supporting the Lunar-Mars Initiative. Hi-definition television (HDTV), neural nets, model-based reasoning, advanced languages, CPU designs, and computer networking standards are areas which have been forecasted to make major strides in the next 30 years. A major challenge to NASA is to bring these technologies online without compromising mission safety. In past programs, NASA managers have been understandably reluctant to rely on new technologies for mission critical activities until they are proven in noncritical areas. NASA must develop strategies to allow inflight confidence building and migration of technologies into the trusted tool base. NASA has successfully met this challenge and developed a winning strategy in the Space Shuttle Mission Control Center. This facility, which is clearly among NASA's most critical, is based on 1970's mainframe architecture. Changes to the mainframe are very expensive due to the extensive testing required to prove that changes do not have unanticipated impact on critical processes. Systematic improvement efforts in this facility have been delayed due to this 'risk to change.' In the real-time data system (RTDS) we have introduced a network of engineering computer workstations which run in parallel to the mainframe system. These workstations are located next to flight controller operating positions in mission control and, in some cases, the display units are mounted in the traditional mainframe consoles. This system incorporates several major improvements over the mainframe consoles including automated fault detection by real-time expert systems and color graphic animated schematics of subsystems driven by real-time telemetry. The workstations have the capability of recording telemetry data and providing 'instant replay' for flight controllers. RTDS also provides unique graphics animated by real-time telemetry such as workstation emulation of the shuttle's flight instruments and displays of the remote manipulator system (RMS) position. These systems have been used successfully as prime operational tools since STS-26 and have supported seven shuttle missions.
Progress in Decommissioning the Humboldt Bay Power Plant - 13604
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John
Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less
Ecological Impacts of the Space Shuttle Program at John F. Kennedy Space Center, Florida
NASA Technical Reports Server (NTRS)
Hall, Carlton R.; Schmalzer, Paul A.; Breininger, David R.; Duncan, Brean W.; Drese, John H.; Scheidt, Doug A.; Lowers, Russ H.; Reyier, Eric A.; Holloway-Adkins, Karen G.; Oddy, Donna M.;
2014-01-01
The Space Shuttle Program was one of NASAs first major undertakings to fall under the environmental impact analysis and documentation requirements of the National Environmental Policy Act of 1969 (NEPA). Space Shuttle Program activities at John F. Kennedy Space Center (KSC) and the associated Merritt Island National Wildlife Refuge (MINWR) contributed directly and indirectly to both negative and positive ecological trends in the region through the long-term, stable expenditure of resources over the 40 year program life cycle. These expenditures provided support to regional growth and development in conjunction with other sources that altered land use patterns, eliminated and modified habitats, and contributed to cultural eutrophication of the Indian River Lagoon. At KSC, most Space Shuttle Program related actions were conducted in previously developed facilities and industrial areas with the exception of the construction of the shuttle landing facility (SLF) and the space station processing facility (SSPF). Launch and operations impacts were minimal as a result of the low annual launch rate. The majority of concerns identified during the NEPA process such as potential weather modification, acid rain off site, and local climate change did not occur. Launch impacts from deposition of HCl and particulates were assimilated as a result of the high buffering capacity of the system and low launch and loading rates. Metals deposition from exhaust deposition did not display acute impacts. Sub-lethal effects are being investigated as part of the Resource Conservation and Recovery Act (RCRA) regulatory process. Major positive Space Shuttle Program effects were derived from the adequate resources available at the Center to implement the numerous environmental laws and regulations designed to enhance the quality of the environment and minimize impacts from human activities. This included reduced discharges of domestic and industrial wastewater, creation of stormwater management systems, remediation of past contamination sites, implementation of hazardous waste management systems, and creation of a culture of sustainability. Working with partners such as the USFWS and the St Johns River Water Management District (SJRWMD), wetlands and scrub restoration and management initiatives were implemented to enhance fish and wildlife populations at the Center. KSC remains the single largest preserve on the east coast of Florida in part due to NASAs commitment to stewardship. Ongoing Ecological Program projects are directed at development of information and knowledge to address future KSC management questions including the transition to a joint government and commercial launch facility, enhanced habitat management requirements for wetlands and scrub, potential impacts of emerging contaminants, and adaptation to climate change including projected sea level rise over the next 50-75 years.
The fault monitoring and diagnosis knowledge-based system for space power systems: AMPERES, phase 1
NASA Technical Reports Server (NTRS)
Lee, S. C.
1989-01-01
The objective is to develop a real time fault monitoring and diagnosis knowledge-based system (KBS) for space power systems which can save costly operational manpower and can achieve more reliable space power system operation. The proposed KBS was developed using the Autonomously Managed Power System (AMPS) test facility currently installed at NASA Marshall Space Flight Center (MSFC), but the basic approach taken for this project could be applicable for other space power systems. The proposed KBS is entitled Autonomously Managed Power-System Extendible Real-time Expert System (AMPERES). In Phase 1 the emphasis was put on the design of the overall KBS, the identification of the basic research required, the initial performance of the research, and the development of a prototype KBS. In Phase 2, emphasis is put on the completion of the research initiated in Phase 1, and the enhancement of the prototype KBS developed in Phase 1. This enhancement is intended to achieve a working real time KBS incorporated with the NASA space power system test facilities. Three major research areas were identified and progress was made in each area. These areas are real time data acquisition and its supporting data structure; sensor value validations; development of inference scheme for effective fault monitoring and diagnosis, and its supporting knowledge representation scheme.
LWS/SET End-to-End Data System
NASA Technical Reports Server (NTRS)
Giffin, Geoff; Sherman, Barry; Colon, Gilberto (Technical Monitor)
2002-01-01
This paper describes the concept for the End-to-End Data System that will support NASA's Living With a Star Space Environment Testbed missions. NASA has initiated the Living With a Star (LWS) Program to develop a better scientific understanding to address the aspects of the connected Sun-Earth system that affect life and society. A principal goal of the program is to bridge the gap.between science, engineering, and user application communities. The Space Environment Testbed (SET) Project is one element of LWS. The Project will enable future science, operational, and commercial objectives in space and atmospheric environments by improving engineering approaches to the accommodation and/or mitigation of the effects of solar variability on technological systems. The End-to-end data system allows investigators to access the SET control center, command their experiments, and receive data from their experiments back at their home facility, using the Internet. The logical functioning of major components of the end-to-end data system are described, including the GSFC Payload Operations Control Center (POCC), SET Payloads, the GSFC SET Simulation Lab, SET Experiment PI Facilities, and Host Systems. Host Spacecraft Operations Control Centers (SOCC) and the Host Spacecraft are essential links in the end-to-end data system, but are not directly under the control of the SET Project. Formal interfaces will be established between these entities and elements of the SET Project. The paper describes data flow through the system, from PI facilities connecting to the SET operations center via the Internet, communications to SET carriers and experiments via host systems, to telemetry returns to investigators from their flight experiments. It also outlines the techniques that will be used to meet mission requirements, while holding development and operational costs to a minimum. Additional information is included in the original extended abstract.
ERIC Educational Resources Information Center
German, Carl, Jr.
The major purpose of this guide is to elicit the information necessary for writing educational specifications for facilities to house technical education programs in metallurgy. It is organized in these parts: (1) Part I discusses the major purpose, underlying assumptions, recent instructional trends, and guiding principles utilized in the…
Unmanned Aerial Systems, Moored Balloons, and the U.S. Department of Energy ARM Facilities in Alaska
NASA Astrophysics Data System (ADS)
Ivey, Mark; Verlinde, Johannes
2014-05-01
The U.S. Department of Energy (DOE), through its scientific user facility, the Atmospheric Radiation Measurement (ARM) Climate Research Facility, provides scientific infrastructure and data to the international Arctic research community via its research sites located on the North Slope of Alaska. Facilities and infrastructure to support operations of unmanned aerial systems for science missions in the Arctic and North Slope of Alaska were established at Oliktok Point Alaska in 2013. Tethered instrumented balloons will be used in the near future to make measurements of clouds in the boundary layer including mixed-phase clouds. The DOE ARM Program has operated an atmospheric measurement facility in Barrow, Alaska, since 1998. Major upgrades to this facility, including scanning radars, were added in 2010. Arctic Observing Networks are essential to meet growing policy, social, commercial, and scientific needs. Calibrated, high-quality arctic geophysical datasets that span ten years or longer are especially important for climate studies, climate model initializations and validations, and for related climate policy activities. For example, atmospheric data and derived atmospheric forcing estimates are critical for sea-ice simulations. International requirements for well-coordinated, long-term, and sustained Arctic Observing Networks and easily-accessible data sets collected by those networks have been recognized by many high-level workshops and reports (Arctic Council Meetings and workshops, National Research Council reports, NSF workshops and others). The recent Sustaining Arctic Observation Network (SAON) initiative sponsored a series of workshops to "develop a set of recommendations on how to achieve long-term Arctic-wide observing activities that provide free, open, and timely access to high-quality data that will realize pan-Arctic and global value-added services and provide societal benefits." This poster will present information on opportunities for members of the arctic research community to make atmospheric measurements using unmanned aerial systems or tethered balloons.
Barskey, Albert E.; Shah, Priti P.; Schrag, Stephanie; Whitney, Cynthia G.; Arduino, Matthew J.; Reddy, Sujan C.; Kunz, Jasen M.; Hunter, Candis M.; Raphael, Brian H.; Cooley, Laura A.
2017-01-01
Background Legionnaires’ disease, a severe pneumonia, is typically acquired through inhalation of aerosolized water containing Legionella bacteria. Legionella can grow in the complex water systems of buildings, including health care facilities. Effective water management programs could prevent the growth of Legionella in building water systems. Methods Using national surveillance data, Legionnaires’ disease cases were characterized from the 21 jurisdictions (20 U.S. states and one large metropolitan area) that reported exposure information for ≥90% of 2015 Legionella infections. An assessment of whether cases were health care–associated was completed; definite health care association was defined as hospitalization or long-term care facility residence for the entire 10 days preceding symptom onset, and possible association was defined as any exposure to a health care facility for a portion of the 10 days preceding symptom onset. All other Legionnaires’ disease cases were considered unrelated to health care. Results A total of 2,809 confirmed Legionnaires’ disease cases were reported from the 21 jurisdictions, including 85 (3%) definite and 468 (17%) possible health care–associated cases. Among the 21 jurisdictions, 16 (76%) reported 1–21 definite health care–associated cases per jurisdiction. Among definite health care–associated cases, the majority (75, 88%) occurred in persons aged ≥60 years, and exposures occurred at 72 facilities (15 hospitals and 57 long-term care facilities). The case fatality rate was 25% for definite and 10% for possible health care–associated Legionnaires’ disease. Conclusions and Implications for Public Health Practice Exposure to Legionella from health care facility water systems can result in Legionnaires’ disease. The high case fatality rate of health care–associated Legionnaires’ disease highlights the importance of case prevention and response activities, including implementation of effective water management programs and timely case identification. PMID:28594788
Kulesher, Robert R
2006-01-01
The prospective payment system is one of many changes in reimbursement that has affected the delivery of health care. Originally developed for the payment of inpatient hospital services, it has become a major factor in how all health insurance is reimbursed. The policy implications extend beyond the Medicare program and affect the entire health care delivery system. Initially implemented in 1982 for payments to hospitals, prospective payment system was extended to payments for skilled nursing facility and home health agency services by the Balanced Budget Act of 1997. The intent of the Balanced Budget Act was to bring into balance the federal budget through reductions in spending. The decisions that providers have made to mitigate the impact are a function of ownership type, organizational mission, and current level of Medicare participation. This article summarizes the findings of several initial studies on the Balanced Budget Act's impact and discusses how changes in Medicare reimbursement policy have influenced the delivery of health care for the general public and for Medicare beneficiaries.
Comparison of Hospitalization Rates among For-Profit and Nonprofit Dialysis Facilities
Johansen, Kirsten L.; Romano, Patrick S.; Chertow, Glenn M.; Mu, Yi; Ishida, Julie H.; Grimes, Barbara; Kaysen, George A.; Nguyen, Danh V.
2014-01-01
Summary Background and objectives The vast majority of US dialysis facilities are for-profit and profit status has been associated with processes of care and outcomes in patients on dialysis. This study examined whether dialysis facility profit status was associated with the rate of hospitalization in patients starting dialysis. Design, setting, participants, & methods This was a retrospective cohort study of Medicare beneficiaries starting dialysis between 2005 and 2008 using data from the US Renal Data System. All-cause hospitalization was examined and compared between for-profit and nonprofit dialysis facilities through 2009 using Poisson regression. Companion analyses of cause-specific hospitalization that are likely to be influenced by dialysis facility practices including hospitalizations for heart failure and volume overload, access complications, or hyperkalemia were conducted. Results The cohort included 150,642 patients. Of these, 12,985 (9%) were receiving care in nonprofit dialysis facilities. In adjusted models, patients receiving hemodialysis in for-profit facilities had a 15% (95% confidence interval [95% CI], 13% to 18%) higher relative rate of hospitalization compared with those in nonprofit facilities. Among patients receiving peritoneal dialysis, the rate of hospitalization in for-profit versus nonprofit facilities was not significantly different (relative rate, 1.07; 95% CI, 0.97 to 1.17). Patients on hemodialysis receiving care in for-profit dialysis facilities had a 37% (95% CI, 31% to 44%) higher rate of hospitalization for heart failure or volume overload and a 15% (95% CI, 11% to 20%) higher rate of hospitalization for vascular access complications. Conclusions Hospitalization rates were significantly higher for patients receiving hemodialysis in for-profit compared with nonprofit dialysis facilities. PMID:24370770
Application of a Systems Engineering Approach to Support Space Reactor Development
NASA Astrophysics Data System (ADS)
Wold, Scott
2005-02-01
In 1992, approximately 25 Russian and 12 U.S. engineers and technicians were involved in the transport, assembly, inspection, and testing of over 90 tons of Russian equipment associated with the Thermionic System Evaluation Test (TSET) Facility. The entire Russian Baikal Test Stand, consisting of a 5.79 m tall vacuum chamber and related support equipment, was reassembled and tested at the TSET facility in less than four months. In November 1992, the first non-nuclear operational test of a complete thermionic power reactor system in the U.S. was accomplished three months ahead of schedule and under budget. A major factor in this accomplishment was the application of a disciplined top-down systems engineering approach and application of a spiral development model to achieve the desired objectives of the TOPAZ International Program (TIP). Systems Engineering is a structured discipline that helps programs and projects conceive, develop, integrate, test and deliver products and services that meet customer requirements within cost and schedule. This paper discusses the impact of Systems Engineering and a spiral development model on the success of the TOPAZ International Program and how the application of a similar approach could help ensure the success of future space reactor development projects.
2005-11-30
KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility Bay 2, the nose cap of space shuttle Endeavour is prepared for installation of thermal protection system blankets. Endeavour recently came out of a nearly two-year Orbiter Major Modification period which began in December 2003. Engineers and technicians spent 900,000 hours performing 124 modifications to the vehicle. These included all recommended return-to-flight safety modifications, bonding more than 1,000 thermal protection system tiles and inspecting more than 150 miles of wiring throughout the orbiter. Shuttle major modification periods are scheduled at regular intervals to enhance safety and performance, infuse new technology, and allow for thorough inspections of the airframe and wiring of the vehicles. This was the second of these modification periods performed entirely at Kennedy Space Center. Endeavour's previous modification was completed in March 1997.
Modeling the potential radionuclide transport by the Ob and Yenisey Rivers to the Kara Sea.
Paluszkiewicz, T; Hibler, L F; Richmond, M C; Bradley, D J; Thomas, S A
2001-01-01
A major portion of the former Soviet Union (FSU) nuclear program is located in the West Siberian Basin. Among the many nuclear facilities are three production reactors and the spent nuclear fuel reprocessing sites, Mayak, Tomsk-7, and Krasnoyarsk-26, which together are probably responsible for the majority of the radioactive contamination found in the Ob and Yenisey River systems that feed into the Arctic Ocean through the Kara Sea. This manuscript describes ongoing research to estimate radionuclide fluxes to the Kara Sea from these river systems. Our approach is to apply a hierarchy of simple models that use existing and forthcoming data to quantify the transport and fate of radionuclide contaminants via various environmental pathways. We present an initial quantification of the contaminant inventory, hydrology, meteorology, and sedimentology of the Ob River system and preliminary conclusions from portions of the Ob River model.