Sample records for major installations appendix

  1. System administrator`s guide to CDPS. Version 1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Didier, B.T.; Portwood, M.H.

    The System Administrator`s Guide to CDPS is intended for those responsible for setting up and maintaining the hardware and software of a Common Mapping Standard (CMS) Date Production System (CDPS) installation. This guide assists the system administrator in performing typical administrative functions. It is not intended to replace the Ultrix Documentation Set that should be available for a DCPS installation. The Ultrix Documentation Set will be required to provide details on referenced Ultrix commands as well as procedures for performing Ultrix maintenance functions. There are six major sections in this guide. Section 1 introduces the system administrator to CDPS andmore » describes the assumptions that are made by this guide. Section 2 describes the CDPS platform configuration. Section 3 describes the platform preparation that is required to install the CDPS software. Section 4 describes the CPS software and its installation procedures. Section 5 describes the CDS software and its installation procedures. Section 6 describes various operation and maintenance procedures. Four appendices are also provided. Appendix A contains a list of used acronyms. Appendix B provides a terse description of common Ultrix commands that are used in administrative functions. Appendix C provides sample CPS and CDS configuration files. Appendix D provides a required list and a recommended list of Ultrix software subsets for installation on a CDPS platform.« less

  2. 14 CFR Appendix B to Part 43 - Recording of Major Repairs and Major Alterations

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... inspected. (d) For extended-range fuel tanks installed within the passenger compartment or a baggage... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Recording of Major Repairs and Major... to Part 43—Recording of Major Repairs and Major Alterations (a) Except as provided in paragraphs (b...

  3. Department of Defense Data Model, Version 1, Fy 1998, Volume 1.

    DTIC Science & Technology

    1998-05-31

    INSTALLATION-POSTAL-ADDRESS INSTALLATION-RESTORATION- ADVISORY -BOARD INSTALLATION-SURVEY INSTALLATION-USPS-POSTAL-ADDRESS INSTALLMENT- PAYMENT ...Standards 5 U SECTION 5 Entity Report 6 SECTION 6 Attribute Report 7 SECTION 7 Entity Relationship Report 8 SECTION 8 DoD Data Model Enhancements Report ...8 SECTION 9 Functional Area Using Model Report 8 Appendix A IDEFlx Modeling Conventions 8 Appendix B Acronyms ; 8 Appendix

  4. 32 CFR Appendix A to Part 989 - Glossary of References, Abbreviations, Acronyms, and Terms

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MAJCOM Major Command MGM Materiel Group Manager MOA Military Operating Area MOU Memorandum of... Air Force for Installations, Environment & Logistics SAF/IEE Deputy Assistant Secretary of the Air...

  5. 32 CFR Appendix A to Part 989 - Glossary of References, Abbreviations, Acronyms, and Terms

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MAJCOM Major Command MGM Materiel Group Manager MOA Military Operating Area MOU Memorandum of... Air Force for Installations, Environment & Logistics SAF/IEE Deputy Assistant Secretary of the Air...

  6. 32 CFR Appendix A to Part 989 - Glossary of References, Abbreviations, Acronyms, and Terms

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... MAJCOM Major Command MGM Materiel Group Manager MOA Military Operating Area MOU Memorandum of... Air Force for Installations, Environment & Logistics SAF/IEE Deputy Assistant Secretary of the Air...

  7. 32 CFR Appendix A to Part 989 - Glossary of References, Abbreviations, Acronyms, and Terms

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MAJCOM Major Command MGM Materiel Group Manager MOA Military Operating Area MOU Memorandum of... Air Force for Installations, Environment & Logistics SAF/IEE Deputy Assistant Secretary of the Air...

  8. 49 CFR Appendix C to Part 595 - Installation of Air Bag On-Off Switches

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Installation of Air Bag On-Off Switches C Appendix C to Part 595 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL... EXEMPTIONS Pt. 595, App. C Appendix C to Part 595—Installation of Air Bag On-Off Switches ER21NO97.012 ...

  9. 14 CFR Appendix H to Part 23 - Installation of An Automatic Power Reserve (APR) System

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation of An Automatic Power Reserve (APR) System H Appendix H to Part 23 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... AIRPLANES Pt. 23, App. H Appendix H to Part 23—Installation of An Automatic Power Reserve (APR) System H23.1...

  10. 49 CFR Appendix C to Part 595 - Installation of Air Bag On-Off Switches

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Installation of Air Bag On-Off Switches C Appendix C to Part 595 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL... EXEMPTIONS Pt. 595, App. C Appendix C to Part 595—Installation of Air Bag On-Off Switches ER21NO97.012 ...

  11. 49 CFR Appendix C to Part 595 - Installation of Air Bag On-Off Switches

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Installation of Air Bag On-Off Switches C Appendix C to Part 595 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL... EXEMPTIONS Pt. 595, App. C Appendix C to Part 595—Installation of Air Bag On-Off Switches ER21NO97.012 ...

  12. 49 CFR Appendix C to Part 595 - Installation of Air Bag On-Off Switches

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Installation of Air Bag On-Off Switches C Appendix C to Part 595 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL... EXEMPTIONS Pt. 595, App. C Appendix C to Part 595—Installation of Air Bag On-Off Switches ER21NO97.012 ...

  13. 49 CFR Appendix C to Part 595 - Installation of Air Bag On-Off Switches

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Installation of Air Bag On-Off Switches C Appendix C to Part 595 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL... EXEMPTIONS Pt. 595, App. C Appendix C to Part 595—Installation of Air Bag On-Off Switches ER21NO97.012 ...

  14. 14 CFR Appendix A to Part 43 - Major Alterations, Major Repairs, and Preventive Maintenance

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... hub design. (iii) Changes in the governor or control design. (iv) Installation of a propeller governor.... (iv) Engine mounts. (v) Control system. (vi) Landing gear. (vii) Hull or floats. (viii) Elements of an... of gravity limits of the aircraft. (xii) Changes to the basic design of the fuel, oil, cooling...

  15. 32 CFR Appendix C to Part 247 - Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and Distribution of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., and Installation Maps; Sales and Distribution of Non-DoD Publications C Appendix C to Part 247...) MISCELLANEOUS DEPARTMENT OF DEFENSE NEWSPAPERS, MAGAZINES AND CIVILIAN ENTERPRISE PUBLICATIONS Pt. 247, App. C Appendix C to Part 247—Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and...

  16. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  17. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  18. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  19. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  20. 18 CFR Appendix A to Subpart H of... - Appendix A to Subpart H of Part 35

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Rates Pt. 35, Subpt. H, App. A Appendix A to Subpart H of Part 35 Appendix A Standard Screen Format... Reference Seller and Affiliate Capacity A Installed Capacity 19,500 Workpaper. B Long-Term Firm Purchases... Capacity E Installed Capacity 8,000 Workpaper. F Long-Term Firm Purchases 500 Workpaper. G Long-Term Firm...

  1. 14 CFR Appendix I to Part 25 - Installation of an Automatic Takeoff Thrust Control System (ATTCS)

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Appendix I to Part 25—Installation of an Automatic Takeoff Thrust Control System (ATTCS) I25.1General. (a... crew to increase thrust or power. I25.2Definitions. (a) Automatic Takeoff Thrust Control System (ATTCS... Control System (ATTCS) I Appendix I to Part 25 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION...

  2. 76 FR 3113 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... Force's notices for systems of records subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended... Center; major commands; field operating agencies; Military Personnel Sections at Air Force installations... mailing addresses are published as an appendix to the Air Force's compilation of systems of records...

  3. 16 CFR Appendix I to Part 1402 - Recommended Outline for Instruction Booklet on “How To Safely Install Your CB Base Station Antenna”

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... on âHow To Safely Install Your CB Base Station Antennaâ I Appendix I to Part 1402 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CB BASE STATION... Outline for Instruction Booklet on “How To Safely Install Your CB Base Station Antenna” I. Required...

  4. 14 CFR Appendix I to Part 25 - Installation of an Automatic Takeoff Thrust Control System (ATTCS)

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) This appendix specifies additional requirements for installation of an engine power control system that... crew to increase thrust or power. I25.2Definitions. (a) Automatic Takeoff Thrust Control System (ATTCS... mechanical and electrical, that sense engine failure, transmit signals, actuate fuel controls or power levers...

  5. Evaluation of weapons' combustion products in armored vehicles. Appendix A: Sampling and analysis methods. Appendix B: Analytical data. Final report, 30 September 1986-14 December 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Menzies, K.T.; Randel, M.A.; Quill, A.L.

    1989-01-01

    The U.S. Army Biomedical Research and Development Laboratory defined an extensive research program to address the generation of potentially toxic propellant combustion products in crew compartments of armored vehicles during weapons firing. The major objectives of the research were (1) to determine the presence and concentration of propellant combustion products, (2) to determine potential crew exposure to these combustion products, and (3) to assess the efficacy of field monitoring in armored vehicles. To achieve these goals, air monitoring was conducted in selected armored vehicle types, i.e., M109, M60, M3, M1, at several Army installations.

  6. 32 CFR Appendix D to Part 636 - Glossary

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Glossary D Appendix D to Part 636 National... INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Pt. 636, App. D Appendix D to Part 636—Glossary In addition to the terms listed in appendix D to part 634 of this subchapter, the following terms...

  7. 32 CFR Appendix C to Part 247 - Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and Distribution of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Mailing of DoD Newspapers, Magazines, CE Guides...) MISCELLANEOUS DEPARTMENT OF DEFENSE NEWSPAPERS, MAGAZINES AND CIVILIAN ENTERPRISE PUBLICATIONS Pt. 247, App. C Appendix C to Part 247—Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and...

  8. 32 CFR Appendix C to Part 247 - Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and Distribution of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Mailing of DoD Newspapers, Magazines, CE Guides...) MISCELLANEOUS DEPARTMENT OF DEFENSE NEWSPAPERS, MAGAZINES AND CIVILIAN ENTERPRISE PUBLICATIONS Pt. 247, App. C Appendix C to Part 247—Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and...

  9. 32 CFR Appendix C to Part 247 - Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and Distribution of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Mailing of DoD Newspapers, Magazines, CE Guides...) MISCELLANEOUS DEPARTMENT OF DEFENSE NEWSPAPERS, MAGAZINES AND CIVILIAN ENTERPRISE PUBLICATIONS Pt. 247, App. C Appendix C to Part 247—Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and...

  10. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Specifications for the Design... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for... Coast Guard for clarity. 1Purpose The purpose of these Specifications is to provide specific design...

  11. The 1996 Survey of Threatened and Endangered Species on Army Lands: A Summary Report.

    DTIC Science & Technology

    1997-12-01

    D -1 Appendix E: Onsite T&E Species With Critical Habitat ............................ E-1 Appendix F: Installations With at Least One Onsite T&E...plants/animals and MACOM ................ 28 5-1 Number and percent of installations with onsite T&E species and those with critical habitat ...29 5-2 Number and percent of onsite T&E species occurrences for which critical habitat has been designated

  12. 14 CFR Appendix B to Part 135 - Airplane Flight Recorder Specifications

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Airplane Flight Recorder Specifications B Appendix B to Part 135 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION.... B Appendix B to Part 135—Airplane Flight Recorder Specifications Parameters Range Installed system 1...

  13. 32 CFR Appendixes B-C to Part 636 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false [Reserved] B Appendixes B-C to Part 636 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Appendixes B-C to Part 636 [Reserved] ...

  14. 14 CFR Appendix B to Part 135 - Airplane Flight Recorder Specifications

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Airplane Flight Recorder Specifications B Appendix B to Part 135 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION.... B Appendix B to Part 135—Airplane Flight Recorder Specifications Parameters Range Installed system 1...

  15. 14 CFR Appendix E to Part 91 - Airplane Flight Recorder Specifications

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Airplane Flight Recorder Specifications E Appendix E to Part 91 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Appendix E to Part 91—Airplane Flight Recorder Specifications Parameters Range Installed system 1 minimum...

  16. 14 CFR Appendix E to Part 91 - Airplane Flight Recorder Specifications

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Airplane Flight Recorder Specifications E Appendix E to Part 91 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Appendix E to Part 91—Airplane Flight Recorder Specifications Parameters Range Installed system 1 minimum...

  17. 14 CFR Appendix B to Part 135 - Airplane Flight Recorder Specifications

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Airplane Flight Recorder Specifications B Appendix B to Part 135 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION.... B Appendix B to Part 135—Airplane Flight Recorder Specifications Parameters Range Installed system 1...

  18. 14 CFR Appendix E to Part 91 - Airplane Flight Recorder Specifications

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Airplane Flight Recorder Specifications E Appendix E to Part 91 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Appendix E to Part 91—Airplane Flight Recorder Specifications Parameters Range Installed system 1 minimum...

  19. 14 CFR Appendix B to Part 135 - Airplane Flight Recorder Specifications

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Airplane Flight Recorder Specifications B Appendix B to Part 135 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION.... B Appendix B to Part 135—Airplane Flight Recorder Specifications Parameters Range Installed system 1...

  20. 14 CFR Appendix C to Part 135 - Helicopter Flight Recorder Specifications

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Helicopter Flight Recorder Specifications C Appendix C to Part 135 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION.... C Appendix C to Part 135—Helicopter Flight Recorder Specifications Parameters Range Installed system...

  1. Big Data Analytics Test Bed

    DTIC Science & Technology

    2013-09-01

    25 2. Backend Database Support ...............................................................25 3. Installing...29 A. SETUP VIRTUAL INFRASTRUCTURE ...................................................29 B...59 APPENDIX F. INSTALLING AND CONFIGURING BACKEND DATABASE SUPPORT FOR VCENTER

  2. 40 CFR 60.47c - Emission monitoring for particulate matter.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that elects not to install a COMS shall conduct a performance test using Method 9 of appendix A-4 of... operator shall conduct subsequent Method 9 of appendix A-4 of this part performance tests using the... performance test results. (i) If no visible emissions are observed, a subsequent Method 9 of appendix A-4 of...

  3. Operation Crossroads. Atomic Bomb Tests. Volume 6, Part 1, Appendix IX. Final report of Army ground group

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jordan, L.P.

    1946-09-30

    Most of the damage caused by an atomic bomb burst in air is due to its heat wave and concussion effects, although within a few hundred yards some radioactivity, usually soon dissipated, is acquired by various types of material. When the burst takes place beneath the surface of the water, damage due to concussion and wave effects is limited to installations within close range, and a major consideration is the wide dispersal of persistent radioactivity.

  4. 14 CFR Appendix I to Part 151 - Appendix I to Part 151

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... AC 150/5325-4 Runway Length Requirements for Airport Design. AC 150/5330-2 Runway/Taxiway Widths and... Lighting Circuits To Be Installed in Airport Pavements. AC 150/5345-31 Specification for L-833 Individual...

  5. 14 CFR Appendix I to Part 151 - Appendix I to Part 151

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... AC 150/5325-4 Runway Length Requirements for Airport Design. AC 150/5330-2 Runway/Taxiway Widths and... Lighting Circuits To Be Installed in Airport Pavements. AC 150/5345-31 Specification for L-833 Individual...

  6. 14 CFR Appendix I to Part 151 - Appendix I to Part 151

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... AC 150/5325-4 Runway Length Requirements for Airport Design. AC 150/5330-2 Runway/Taxiway Widths and... Lighting Circuits To Be Installed in Airport Pavements. AC 150/5345-31 Specification for L-833 Individual...

  7. 14 CFR Appendix I to Part 151 - Appendix I to Part 151

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... AC 150/5325-4 Runway Length Requirements for Airport Design. AC 150/5330-2 Runway/Taxiway Widths and... Lighting Circuits To Be Installed in Airport Pavements. AC 150/5345-31 Specification for L-833 Individual...

  8. 14 CFR Appendix I to Part 151 - Appendix I to Part 151

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... AC 150/5325-4 Runway Length Requirements for Airport Design. AC 150/5330-2 Runway/Taxiway Widths and... Lighting Circuits To Be Installed in Airport Pavements. AC 150/5345-31 Specification for L-833 Individual...

  9. 32 CFR Appendix C to Part 231 - Sample Certificate of Compliance for Credit Unions Certificate of Compliance

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Unions Certificate of Compliance C Appendix C to Part 231 National Defense Department of Defense... UNIONS AND OTHER FINANCIAL INSTITUTIONS ON DOD INSTALLATIONS Pt. 231, App. C Appendix C to Part 231... union complies with the requirements of section 170 of the Federal Credit Union Act (12 U.S.C 1770), for...

  10. 14 CFR Appendix E to Part 151 - Appendix E to Part 151

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...: Typical Eligible Items 1. Basic types of pavement listed as eligible under § 151.77. 2. Loading ramps. 3... of pavement listed as ineligible under § 151.77. 2. Aprons serving installations for nonpublic use. 3...

  11. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements? (a) If you elect to install a CEMS as specified in Table 5 of this subpart, you must install... periodic data quality checks in accordance with 40 CFR part 60, appendix F, procedure 1. (3) As specified... you are required to install a continuous parameter monitoring system (CPMS) as specified in Table 5 of...

  12. 32 CFR Appendix A to Part 636 - References

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Pt. 636, App. A Appendix A to Part 636... 3946, Military Police Traffic Accident Report DA Form 3975, Military Police Report DD Form 1920... Understanding, Subject: Seizure of Assets for Administrative Forfeiture in Drug Related Cases. ...

  13. 32 CFR Appendix A to Part 636 - References

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Pt. 636, App. A Appendix A to Part 636... 3946, Military Police Traffic Accident Report DA Form 3975, Military Police Report DD Form 1920... Understanding, Subject: Seizure of Assets for Administrative Forfeiture in Drug Related Cases. ...

  14. West coast RFI survey, volume 1, volume 2 appendix E, volume 3 appendix F, volume 4 appendix G, and volume 5 appendix H

    NASA Technical Reports Server (NTRS)

    Deutsch, W. F.

    1972-01-01

    Activities and data reported cover experimental design, mechanization onboard the aircraft, survey operations, quick look and automated data reduction, and a qualitative comparison of survey data with predicted values for the radio frequency survey. The survey was designed to measure amplitude, frequency and time of occurrence of terrestrial emissions in the VHF band during overflights of heavily populated metropolitan areas located on the Pacific Coast of the Continental United States by sensing and recording equipment installed in jet aircraft.

  15. Installation Restoration Program. Phase I. Records Search, Air Force Plant 44, Tucson, Arizona.

    DTIC Science & Technology

    1985-10-01

    Biographical Data APPENDIX B List of Interviewees and Outside Agency Contacts APPENDIX C Master List of Industrial Shops * APPENDIX D References APPENDIX E AF...Collected by the Tucson Groundwater Contamination Study Task Force * Annual Generator’s Reports and Quarterly Reports from AFP 44 to ADHS. Appendix D ...cn (INcC. iU u u a L- - -2 a 0 0) CL C 1-4~~ ~ r % %- d ’ 00 A to did 1-44 L0 47% 0 z- d Ci - Z ..-i I2-8 00 -4 40 0 -0 0j c 0 Sb. 1.- 41 CL "-4 CLV

  16. 40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installed in each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag... hydrogen chloride testing with EPA Method 321 at 40 CFR part 63, appendix A, an owner or operator must install, calibrate, maintain, and operate a CEMS for monitoring hydrogen chloride emissions discharged to...

  17. 14 CFR Appendix D to Part 43 - Scope and Detail of Items (as Applicable to the Particular Aircraft) To Be Included in Annual and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... group: (1) Radio and electronic equipment—for improper installation and insecure mounting. (2) Wiring...) Systems and components—for improper installation, apparent defects, and unsatisfactory operation. (3...) improper operation. (5) Flight and engine controls—for improper installation and improper operation. (6...

  18. Economics of Third-Party Central Heating Plants to Supply the Army

    DTIC Science & Technology

    1992-01-01

    Third-Party Gas-Fired Boiler Economics 52 APPENDIX C: Third-Party Gas Turbine Cogeneration Economics ( PURPA ) 58 APPENDIX D: Government Gas Turbine...Turbine Cogeneration Economics (Installation and PURPA Purchase) 76 APPENDIX G: Checklist for Identifying Optimal Third-Party Projects and Bidders 82...of scale 37 4 Relative costs of thermal energy from third-party cogeneration plants (@ 4C/kWh PURPA payment) 38 5 Comparison of life-cycle costs for

  19. 10 CFR Appendix A to Part 440 - Standards for Weatherization Materials

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...] Insulate tank and distribution piping (See insulation section of this appendix). Install heat traps on..., Ceilings, Attics, and Roofs Insulation—organic fiber—conformance to Interim Safety Standard in 16 CFR part 1209; Fire Safety Requirements for Thermal Insulating Materials According to Insulation Use—Attic Floor...

  20. 10 CFR Appendix A to Part 440 - Standards for Weatherization Materials

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...] Insulate tank and distribution piping (See insulation section of this appendix). Install heat traps on..., Ceilings, Attics, and Roofs Insulation—organic fiber—conformance to Interim Safety Standard in 16 CFR part 1209; Fire Safety Requirements for Thermal Insulating Materials According to Insulation Use—Attic Floor...

  1. 10 CFR Appendix A to Part 440 - Standards for Weatherization Materials

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...] Insulate tank and distribution piping (See insulation section of this appendix). Install heat traps on..., Ceilings, Attics, and Roofs Insulation—organic fiber—conformance to Interim Safety Standard in 16 CFR part 1209; Fire Safety Requirements for Thermal Insulating Materials According to Insulation Use—Attic Floor...

  2. 10 CFR Appendix A to Part 440 - Standards for Weatherization Materials

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...] Insulate tank and distribution piping (See insulation section of this appendix). Install heat traps on..., Ceilings, Attics, and Roofs Insulation—organic fiber—conformance to Interim Safety Standard in 16 CFR part 1209; Fire Safety Requirements for Thermal Insulating Materials According to Insulation Use—Attic Floor...

  3. Littoral Combat Ship (LCS) Manpower Requirements Analysis

    DTIC Science & Technology

    2004-12-01

    THIS PAGE INTENTIONALLY LEFT BLANK 183 APPENDIX W. ABBREVIATIONS AND ACRONYMS AFFF Aqueous Film Forming Foam AIC Aircraft Intercept Control ASW...181 APPENDIX W. ABBREVIATIONS AND ACRONYMS ..................... 183 LIST OF REFERENCES .........................................187 INITIAL...today. For example, the installed AFFF and CO2 systems inside critical spaces such as the main engineering and ordnance spaces. The Damage

  4. 14 CFR Appendix E to Part 91 - Airplane Flight Recorder Specifications

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Airplane Flight Recorder Specifications E... (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Pt. 91, App. E Appendix E to Part 91—Airplane Flight Recorder Specifications Parameters Range Installed system 1 minimum...

  5. 14 CFR Appendix F to Part 91 - Helicopter Flight Recorder Specifications

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Helicopter Flight Recorder Specifications F... (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Pt. 91, App. F Appendix F to Part 91—Helicopter Flight Recorder Specifications Parameters Range Installed system 1 minimum...

  6. 14 CFR Appendix C to Part 135 - Helicopter Flight Recorder Specifications

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Helicopter Flight Recorder Specifications C.... C Appendix C to Part 135—Helicopter Flight Recorder Specifications Parameters Range Installed system... Maximum range +5% 1 1% 2 Engine torque Maximum range ±5% 1 1% 2 Flight Control—Hydraulic Pressure Primary...

  7. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  8. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  9. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  10. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  11. 32 CFR Appendix B to Part 231 - In-Store Banking

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) MISCELLANEOUS PROCEDURES GOVERNING BANKS, CREDIT UNIONS AND OTHER FINANCIAL INSTITUTIONS ON DOD INSTALLATIONS Pt. 231, App. B Appendix B to Part 231—In-Store Banking A. Selection Process. The purpose of this guidance is to assure an impartial and thorough process to select the best on-base financial institution to...

  12. 32 CFR Appendix B to Part 231 - In-Store Banking

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) MISCELLANEOUS PROCEDURES GOVERNING BANKS, CREDIT UNIONS AND OTHER FINANCIAL INSTITUTIONS ON DOD INSTALLATIONS Pt. 231, App. B Appendix B to Part 231—In-Store Banking A. Selection Process. The purpose of this guidance is to assure an impartial and thorough process to select the best on-base financial institution to...

  13. 32 CFR Appendix B to Part 231 - In-Store Banking

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) MISCELLANEOUS PROCEDURES GOVERNING BANKS, CREDIT UNIONS AND OTHER FINANCIAL INSTITUTIONS ON DOD INSTALLATIONS Pt. 231, App. B Appendix B to Part 231—In-Store Banking A. Selection Process. The purpose of this guidance is to assure an impartial and thorough process to select the best on-base financial institution to...

  14. Impact of non-freeway rumble strips phase 1 : appendix III, example of rear end "target" crashes.

    DOT National Transportation Integrated Search

    2012-06-25

    In an effort to reduce lane-departure crashes, in 2008 the Michigan Department of Transportation (MDOT) began a three-year statewide non-freeway rumble strip installation initiative. This initiative called for the installation of milled centerline ru...

  15. Impact of non-freeway rumble strips phase 1 : appendix I, driver behavior data for curve locations.

    DOT National Transportation Integrated Search

    2012-06-26

    In an effort to reduce lane-departure crashes, in 2008 the Michigan Department of Transportation (MDOT) began a three-year statewide non-freeway rumble strip installation initiative. This initiative called for the installation of milled centerline ru...

  16. Explosives Washout Lagoons Soils Operable Unit Supplemental Investigation Technical and Environmental Management Support of Installation Restoration Technology Development Program Umatilla Depot Activity Hermiston, Oregon

    DTIC Science & Technology

    1992-04-15

    an ofcial endorsement or approval of the use of such commercial products. This report may not be cited for purposes of advertisement . "EngineersM M7...Logs Appendix C. Laboratory Results of Soil Samples Appendix D. Concentration of Contaminants vs . Depth in Soils Appendix E. Lithologic Profiles of...dramatic difference in concentrations of explosives in areas outside the lagoons vs . concentrations beneath the lagoons. The results confirm that ES-I

  17. 14 CFR Appendix D to Part 147 - Powerplant Curriculum Subjects

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a. reciprocating engines (1) 1. Inspect and repair a radial engine. (2) 2. Overhaul reciprocating.... Install, troubleshoot, and remove reciprocating engines. b. turbine engines (2) 5. Overhaul turbine engine. (3) 6. Inspect, check, service, and repair turbine engines and turbine engine installations. (3) 7...

  18. 14 CFR Appendix D to Part 147 - Powerplant Curriculum Subjects

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a. reciprocating engines (1) 1. Inspect and repair a radial engine. (2) 2. Overhaul reciprocating.... Install, troubleshoot, and remove reciprocating engines. b. turbine engines (2) 5. Overhaul turbine engine. (3) 6. Inspect, check, service, and repair turbine engines and turbine engine installations. (3) 7...

  19. 14 CFR Appendix D to Part 147 - Powerplant Curriculum Subjects

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... a. reciprocating engines (1) 1. Inspect and repair a radial engine. (2) 2. Overhaul reciprocating.... Install, troubleshoot, and remove reciprocating engines. b. turbine engines (2) 5. Overhaul turbine engine. (3) 6. Inspect, check, service, and repair turbine engines and turbine engine installations. (3) 7...

  20. 14 CFR Appendix D to Part 147 - Powerplant Curriculum Subjects

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... a. reciprocating engines (1) 1. Inspect and repair a radial engine. (2) 2. Overhaul reciprocating.... Install, troubleshoot, and remove reciprocating engines. b. turbine engines (2) 5. Overhaul turbine engine. (3) 6. Inspect, check, service, and repair turbine engines and turbine engine installations. (3) 7...

  1. 14 CFR Appendix E to Part 25 - Appendix E to Part 25

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... certificated takeoff and landing weights of an airplane equipped with a type-certificated standby power rocket engine may obtain an increase as specified in paragraph (b) if— (1) The installation of the rocket engine has been approved and it has been established by flight test that the rocket engine and its controls...

  2. 14 CFR Appendix E to Part 25 - Appendix E to Part 25

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... certificated takeoff and landing weights of an airplane equipped with a type-certificated standby power rocket engine may obtain an increase as specified in paragraph (b) if— (1) The installation of the rocket engine has been approved and it has been established by flight test that the rocket engine and its controls...

  3. 14 CFR Appendix E to Part 25 - Appendix E to Part 25

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... certificated takeoff and landing weights of an airplane equipped with a type-certificated standby power rocket engine may obtain an increase as specified in paragraph (b) if— (1) The installation of the rocket engine has been approved and it has been established by flight test that the rocket engine and its controls...

  4. 14 CFR Appendix E to Part 25 - Appendix E to Part 25

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... certificated takeoff and landing weights of an airplane equipped with a type-certificated standby power rocket engine may obtain an increase as specified in paragraph (b) if— (1) The installation of the rocket engine has been approved and it has been established by flight test that the rocket engine and its controls...

  5. 14 CFR Appendix E to Part 25 - Appendix E to Part 25

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... certificated takeoff and landing weights of an airplane equipped with a type-certificated standby power rocket engine may obtain an increase as specified in paragraph (b) if— (1) The installation of the rocket engine has been approved and it has been established by flight test that the rocket engine and its controls...

  6. 14 CFR Appendix C to Part 27 - Criteria for Category A

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... unless it meets the design installation and performance requirements contained in this appendix in... drive system: Design. 29.927(c)(1)—Additional tests. 29.953(a)—Fuel system independence. 29.1027(a)—Transmission and gearboxes: General. 29.1045(a)(1), (b), (c), (d), and (f)—Climb cooling test procedures. 29...

  7. Impact of non-freeway rumble strips phase 1 : appendix II, example of run off the road left "target" crashes.

    DOT National Transportation Integrated Search

    2012-06-26

    In an effort to reduce lane-departure crashes, in 2008 the Michigan Department of Transportation (MDOT) began a three-year statewide non-freeway rumble strip installation initiative. This initiative called for the installation of milled centerline ru...

  8. 32 CFR Appendix B to Part 518 - Addressing FOIA Requests

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... command, installation, or organization, to the attention of the FOIA Official. (3) Consult AR 25-400-2... installations or organizations as follows: (1) Current publications and records of DA field commands... on active duty and retired personnel—Commander, U.S. Army Human Resources Command, St. Louis, 1...

  9. 40 CFR 75.66 - Petitions to the Administrator.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for each submission. (b) Alternative flow monitoring method petition. In cases where no location exists for installation of a flow monitor in either the stack or the ducts serving an affected unit that satisfies the minimum physical siting criteria in appendix A of this part or where installation of a flow...

  10. 40 CFR 75.66 - Petitions to the Administrator.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for each submission. (b) Alternative flow monitoring method petition. In cases where no location exists for installation of a flow monitor in either the stack or the ducts serving an affected unit that satisfies the minimum physical siting criteria in appendix A of this part or where installation of a flow...

  11. 40 CFR 75.66 - Petitions to the Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for each submission. (b) Alternative flow monitoring method petition. In cases where no location exists for installation of a flow monitor in either the stack or the ducts serving an affected unit that satisfies the minimum physical siting criteria in appendix A of this part or where installation of a flow...

  12. 40 CFR 75.66 - Petitions to the Administrator.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for each submission. (b) Alternative flow monitoring method petition. In cases where no location exists for installation of a flow monitor in either the stack or the ducts serving an affected unit that satisfies the minimum physical siting criteria in appendix A of this part or where installation of a flow...

  13. Coastal Surveillance Baseline Model Development

    DTIC Science & Technology

    2015-02-27

    In the current STK model, a set of areas was defined for two reasons: To provide visual assistance during ship and aircraft route planning; and To...RF), electro-optic (EO), infrared (IR), and visual Partially Met The free version of STK can only generate simple generic sensors RQ-04 The model...25 APPENDIX A PLATFORM OBJECT ROUTE PLANNING PROCEDURE ............. A-1 APPENDIX B STK INSTALLATION

  14. Evaluation of weapons' combustion products in armored vehicles. Appendix C: Summary of descriptive statistics (proc tabulate). Appendix D: Summary of comparative statistics. Final report, 30 September 1986-14 December 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Menzies, K.T.; Randel, M.A.; Quill, A.L.

    1989-01-01

    The U.S. Army Biomedical Research and Development Laboratory defined an extensive research program to address the generation of potentially toxic propellant combustion products in crew compartments of armored vehicles during weapons firing. The major objectives of the research were (1) to determine the presence and concentration of propellant combustion products, (2) to determine potential crew exposure to these combustion products, and (3) to assess the efficacy of field monitoring in armored vehicles. To achieve these goals, air monitoring was conducted in selected armored vehicle types, i.e., M109, M60, M3, M1, at several Army installations. Auxiliary information concerning the specific munitionsmore » fired and the Training and Doctrine Command (TRADOC) or Forces Command (FORSCOM) firing scenarios was collected so that a comparison of pollutant concentrations generated by specific weapons both within vehicle types and between vehicle types could be made.« less

  15. 40 CFR Appendix S to Subpart G of... - Substitutes Listed in the September 19, 2012 Final Rule, Effective December 18, 2012.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Extinguishing Systems.For establishments filling, installing, servicing, using, or disposing of containers or systems to be used in total flooding applications, EPA recommends the following: —appropriate protective... 2010 standard for Aerosol Extinguishing Systems.For establishments filling, installing, servicing...

  16. 40 CFR Appendix S to Subpart G of... - Substitutes Listed in the September 19, 2012 Final Rule, Effective December 18, 2012.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Extinguishing Systems.For establishments filling, installing, servicing, using, or disposing of containers or systems to be used in total flooding applications, EPA recommends the following: —appropriate protective... 2010 standard for Aerosol Extinguishing Systems.For establishments filling, installing, servicing...

  17. Borehole Data Package for 1998 Wells Installed at Single-Shell Tank Waste Management Area TX-TY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DG Horton; FN Hodges

    1999-03-23

    Four new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at the single-shell tank farm Waste Management Area (WMA) TX-TY during August through November of 1998 in fi,dfillment of Tri-Party Agreement (Eoology 1996) milestone M-24-38. The wells are 299-W1O-26, 299-W14-13, 299-W14-14, and 299-W15-40. Well 299-W1O-26 is located outside the east fence of the TY tank farm and replaces downgradient well299-W1O-18; well 299-W14-13 is located along the east fence near the northeast corner of the TX tank f- and replaces downgradient well 299-W14-12; well 299-W14-14 is located outside the east fence in the south ha.lfof the TX tankmore » fiirm and is anew downgradient well; and well 299-W15-40 is located on the west side of the TX tank farm and is anew upgradient well. The locations of all wells in the monitoring network are shown on Figure 1. The groundwater monitoring plan for WMA TX-TY (Caggiano and Goodwin 1991) describes the hydrogeology of the 200 West Area and WMA TX-TY. An Interim Change Notice to the groundwater monitoring plan provides justification for the new wells. The new wells were constructed to the speciii- cations and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303. This document compiles &fiormation on the drilling and construction, well development pump instal- latio~ groundwater sampling, and sediment testing applicable to wells 299-W1O-26, 299-W14-13, 299-W14-14, and 299-W15-40. Appendix A contains the geologist's log, the Well Construction Sum- mary Repo~ and Well Summary Sheet (as-built diagram); Appendix B contains results of laboratory analyses of particle size distribution, p~ conductivity, calcium carbonate conten~ major cation and anion concentrations from 1:1 water: sediment extracts, and moisture conten~ Appendix C contains geophysical logs; and Appendix D contains the analytical results from groundwater samples obtained during well construction. Aqutier tests (slug tests) were performed on all the new wells after well completions. Results of the aquifer tests will be reported elsewhere. Additiond documentation concerning well construction is on fde with Bechtel Hanfor& Inc., Richland, Washington.« less

  18. Mobilization Protocols for Hybrid Sensors for Environmental AOP Sampling (HySEAS) Observations

    NASA Technical Reports Server (NTRS)

    Hooker, Stanford B.

    2014-01-01

    The protocols presented here enable the proper mobilization of the latest-generation instruments for measuring the apparent optical properties (AOPs) of aquatic ecosystems. The protocols are designed for the Hybrid Sensors for Environmental AOP Sampling (HySEAS) class of instruments, but are applicable to the community of practice for AOP measurements. The protocols are organized into eleven sections beyond an introductory overview: a) cables and connectors, b) HySEAS instruments, c) platform preparation, d) instrument installation, e) cable installation, f) test deployment, g) test recovery, h) maintenance, i) shipping, j) storage, and k) smallboat operations. Each section concentrates on documenting how to prevent the most likely faults, remedy them should they occur, and accomplishing both with the proper application of a modest set of useful tools. Within the twelve sections, there are Socratic exercises to stimulate thought, and the answers to these exercises appear in Appendix A. Frequently asked questions (FAQs) are summarized in a separate section after the answers to the exercises in Appendix B. For practitioners unfamiliar with the nautical terms used throughout this document plus others likely encountered at sea, an abbreviated dictionary of nautical terms appears in Appendix C. An abbreviated dictionary of radiotelephone terms is presented in Appendix D. To ensure familiarity with many of the tools that are presented, Appendix E provides a description of the tools alongside a thumbnail picture. Abbreviated deployment checklists and cable diagrams are provided in Appendix F. The document concludes with an acknowledgments section, a glossary of acronyms, a definition of symbols, and a list of references.

  19. 32 CFR Appendix C to Subpart M of... - Authorized Activities for Maneuver Training Area Access

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... commercial use (AR 405-80) Installation service and maintenance (AR 420-74, FL Reg 350-30) Non-DoD personnel...-1) Horseback riding on roads and vehicle tracks Walking, distance running Model airplane and rocket...) Installation service and maintenance (AR 420-74) Non-Commercial recreational use: Hunting, fishing and trapping...

  20. 40 CFR 60.2730 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... detection system must be installed in each baghouse compartment or cell. For negative pressure or induced... scrubber, in place of hydrogen chloride testing with EPA Method 321 at 40 CFR part 63, appendix A, an owner... for monitoring hydrogen chloride emissions discharged to the atmosphere and record the output of the...

  1. 40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... leak detection system must be installed in each baghouse compartment or cell. For negative pressure or... scrubber, in place of hydrogen chloride testing with EPA Method 321 at 40 CFR part 63, appendix A, an owner... for monitoring hydrogen chloride emissions discharged to the atmosphere and record the output of the...

  2. Installation Restoration Program. Phase 1. Records Search, Air Force Plant Number 83, Albuquerque, New Mexico

    DTIC Science & Technology

    1983-12-01

    STATEMN’T L * N N 0UNCE D J UST I IICATION T DI Sr 141I IIIT ION / AVAII.ABII flV CODES )SFRIKB-T.OS AVAr.Aa[Ll-Y ANOi SPECIAL ePI A /DIST RIUTION STAMP...Storage Area No. 3 I C-3 Analytical Results for the Soil Sample Taken in the North Parking Lot APPENDIX D PHOTiOGRAPiS APPENDIX E USAF INSTALLATION...1970’s-1981 54 Storage No. 4 5 Underground Cyanide Mid 1950’s to La te 1970’s 51 I Vault i I 1 I I I FIGURE 1 00 z IWO zZi II : 0C OJ IL W z D 0j I co

  3. Installation restoration program. Site investigation report. Revision 4. Volume 2: Appendix B through Appendix E. 155th Air Refueling Group, Nebraska Air National Guard, Lincoln Municipal Airport, Lincoln, Nebraska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    This is Site investigation Report, Volume 2 Appendix B through E. A Site Investigation was performed at the 155th Air Refueling Group at Lincoln, NE to evaluate six areas of suspected contamination identified during a Preliminary Assessment. The sites that this investigation were conducted at are: Site 1 - Fuel Farm, POL Storage Area Site 2 - West End of Old Oak Creek, Site 3 - Former Tank Cleaning/Hazardous Waste Storage Area, Site 4 - Access Road, Dust Control Area, Site 5 - Army National Guard Oil Storage Area, and Site 6 - Hydraulic Pressure Check Unit Storage Area. Themore » report recommended no further action for Sites 3 through 6 due to low levels or no contamination being found. The report recommended that the portion of Site 2 that is located downstream of Site 1 should be included in Site 1. Appendix 2 consist of the following appendix: Well Data and Geologic Boring Logs (Appendix B), Survey Data (Appendix C), Quality Control (Appendix D), and Analytical Results (Appendix E).« less

  4. Allocation and Apportionment of Funding Resources for Military Construction Within the U.S. Army Reserve

    DTIC Science & Technology

    2003-01-01

    greater deployment capabilities. The Stryker specific requirements program at Fort Lewis will be completed by the end of the calendar year 2003. This is...USAR and can be found in appendix B, for a complete list for all United States Army MILCON projects for the FYDP fiscal year 2004 through fiscal year...institution in one of its communities. 59 APPENDIX A ACTIVE ARMY FY 2004 --FY 2009 FYDP Funded Fiscal Year Installation Description MCA DD1391 2004 Fort

  5. 32 CFR Appendix B to Part 286 - Addressing FOIA Requests

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (International & Commercial Programs) Deputy Under Secretary of Defense (Industrial Affairs & Installations... Research & Engineering Director, Small & Disadvantaged Business Utilization Director, Defense Procurement Director, Test Systems Engineering & Evaluation Director, Strategic & Tactical Systems DoD Radiation...

  6. Installation Restoration Program. Phase 1 - Records Search, Elmendorf AFB, Alaska

    DTIC Science & Technology

    1983-09-01

    Installation Restoration Hazardous Waste Management Past Solid Waste Disposal Sites Ground Water Contamination 26. ABSTRACT (CO- ffew. - reev. ilde It necessar...Activity Review 4-1 Industrial Operations (Shops) 4-2 Fire Training 4-13 Fuels Management 4-15 Description of Past On-sane Disposal Methods 4-23 Waste...characteristics, potential for contaminant migration and waste management practices. The details of the rating procedure are presented in Appendix H and the

  7. Energy Security: Emerging Challenges and Opportunities

    DTIC Science & Technology

    2010-08-01

    46 Appendix A: Electrical Capacity Margins...options........................................................................................ 21 6 Net electrical capacity compared to the North...Energy Security The Army Energy and Water Campaign Plan for Installations defines energy security as: the capacity to avoid adverse impact of energy

  8. Appendix: How Do Different Experts View the Dimensions of Student Motivation?

    ERIC Educational Resources Information Center

    Center on Education Policy, 2012

    2012-01-01

    This appendix outlines four major dimensions of motivation and how they are defined by major scholars in the field. [For Student Motivation: An Overlooked Piece of School Reform. Summary, which is a summary of the 8 documents that this appendix was created for, see ED532666.] (Contains 4 endnotes.)

  9. Waste-Management Education and Research Consortium (WERC) annual progress report, 1991--1992. Appendixes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-07

    This report contains the following appendices: Appendix A - Requirements for Undergraduate Level; Appendix B - Requirements for Graduate Level; Appendix C - Graduate Degree In Environmental Engineering; Appendix D - Non-degree Certificate Program; Appendix E - Curriculum for Associate Degree Program; Appendix F - Curriculum for NCC Program; Appendix G - Information 1991 Teleconference Series; Appendix H - Information on 1992 Teleconference Series; Appendix I - WERC interactive Television Courses; Appendix J - WERC Research Seminar Series; Appendix K - Sites for Hazardous/Radioactive Waste Management Series; Appendix L- Summary of Technology Development of the Second Year; Appendix M -more » List of Major Publications Resulting from WERC; Appendix N - Types of Equipment at WERC Laboratories.« less

  10. Installation Restoration Program. Volume 2. 110th Fighter Group Michigan Air National Guard, W.K. Kellogg Memorial Airport, Battle Creek, Michigan

    DTIC Science & Technology

    1993-11-01

    RECOMMENDATIONS SECTION 7 REFERENCES APPENDIX A MONITORING WELL CONSTRUCTION RECORDS AND BORING LOGS APPENDIX B SOIL BORING LOGS 3 APPENDIX C ...0.25 .o000 2- C *LUOEITNYL VINYL ETNEE NA i2/o/U NP 0. 131.0ICNLORMTNMIE NA 12/OS/IS 0.35 0.0S 1.000 DIOCULUSUGRTNAN NA 12/OS/US a 0.45 1.000 ¶ ,2...12l/Sm a 10.001011 kS kfue(K)I m ot~b 12/09/ 12/fl/U a 10.00 1.005 ugejpvu 12/09/ tZ/3U 0 10.0 1 .M E, I c . ce 4Z- CR0ESFENGINEERING SCIENCE 135-073

  11. 50 CFR Appendix D to Part 622 - Specifications for Certified BRDs

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... part of the lazy line attachment system (i.e., any mechanism, such as elephant ears or choker straps... is installed, no part of the lazy line attachment system (i.e., any mechanism, such as elephant ears...

  12. 50 CFR Appendix D to Part 622 - Specifications for Certified BRDs

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... part of the lazy line attachment system (i.e., any mechanism, such as elephant ears or choker straps... is installed, no part of the lazy line attachment system (i.e., any mechanism, such as elephant ears...

  13. 40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... measure organic HAP emissions; and (iv) PS-15 of 40 CFR part 60, appendix B, for CEMS that use Fourier transform infrared spectroscopy to measure organic HAP emissions. (2) You must conduct a performance...

  14. 40 CFR Appendix D to Subpart E of... - Transport and Disposal of Asbestos Waste

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... & Waste Management Division, USEPA, Region II, 26 Federal Plaza, New York, NY 10007, (212) 264-6770... that can be locked when left unattended. Fencing should be installed around the perimeter of the...

  15. Waste-Management Education and Research Consortium (WERC) annual progress report, 1991--1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maji, A. K.; Thomson, Bruce M.; Samani, Zohrab A.

    1992-04-07

    This report contains the following appendices: Appendix A - Requirements for Undergraduate Level; Appendix B - Requirements for Graduate Level; Appendix C - Graduate Degree In Environmental Engineering; Appendix D - Non-degree Certificate Program; Appendix E - Curriculum for Associate Degree Program; Appendix F - Curriculum for NCC Program; Appendix G - Information 1991 Teleconference Series; Appendix H - Information on 1992 Teleconference Series; Appendix I - WERC interactive Television Courses; Appendix J - WERC Research Seminar Series; Appendix K - Sites for Hazardous/Radioactive Waste Management Series; Appendix L- Summary of Technology Development of the Second Year; Appendix M -more » List of Major Publications Resulting from WERC; Appendix N - Types of Equipment at WERC Laboratories.« less

  16. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1. Volume 2. Appendix J-M.

    DTIC Science & Technology

    1985-06-28

    1984 to April 1985 includedr installation of 27 raw mnitor wells and 11 amh l’,(1 zjit~s, collecticn cf seive~t, sarples ftw surfac , soil, shallowv...modifying a sampling and analytical program that addresses the requirements of the project. If project requirements necessitate different quality...reagent blank and at least five (5) different concentrations of thl analyte. A modification of the method of Hubaux and Vos will be used to deter

  17. Facilities Engineering Management System Study. Volume 1. An Automation Survey of Army Installation Directorates of Engineering and Housing

    DTIC Science & Technology

    1988-05-01

    C and Task Reference List 42 APPENDIX C: FE Tasks, Rating Scores , and ID Codes for Forms A and B 54 APPENDIX D: Nonstandard ADP Systems From Form B...DISTRIBUTION 4a "U p o:.U TABLES Number Page 1 Questionnaire Distribution and Response Rate 12 2 Mean Rating Scores for Standard System 13 3 Frequency of...Standard System Use 14 4 Use of System by Division: Standard Systems 16 5 Mean Rating Scores for Nonstandard Systems 22 6 Frequency of Nonstandard

  18. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  19. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  20. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  1. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    EPA Pesticide Factsheets

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  2. 50 CFR Appendix D to Part 622 - Specifications for Certified BRDs

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... attachment system (i.e., any mechanism, such as elephant ears or choker straps, used to attach the lazy line... is installed, no part of the lazy line attachment system (i.e., any mechanism, such as elephant ears...

  3. 50 CFR Appendix D to Part 622 - Specifications for Certified BRDs

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... attachment system (i.e., any mechanism, such as elephant ears or choker straps, used to attach the lazy line... is installed, no part of the lazy line attachment system (i.e., any mechanism, such as elephant ears...

  4. STS-56, RSRM-031, 360L031 KSC processing configuration and data report

    NASA Technical Reports Server (NTRS)

    1993-01-01

    KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build-up, booster assembly, and closeout for STS-56, RSRM flight set 36OL031. Section 2.0 contains a summary of RSRM-031 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-031 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-031 flow. Section 7.0 provides recommendations, if any, for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumables information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.

  5. STS-51, RSRM-033, 360T033 KSC processing configuration and data report

    NASA Technical Reports Server (NTRS)

    Hillard, Robert C.

    1993-01-01

    KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build up, motor assembly, and closeout for STS-51, RSRM flight set 360T033. Section 2.0 contains a summary of RSRM-033 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-033 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-033 flow. Section 7.0 provides recommendations for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumable information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.

  6. Installation restoration program. Site investigation report, IRP sites No. 1, No. 2, and No. 3. 106th Civil Engineering Flight, New York Air National Guard, Roslyn Air National Guard Station, Roslyn, New York. Volume 3, Appendix H. Site Investigation report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-11-01

    This report is a continuation of the Installation Restoration Program site investigation report for IRP Sites No. 1, No. 2 and No. 3 at the Air National Guard, Rosyln, New York. The Sample Delivery Group (SDG) narratives and quality assurance/quality control analytical results of eighteen samples are reported.

  7. Static noise tests on augmentor wing jet STOL research aircraft (C8A Buffalo)

    NASA Technical Reports Server (NTRS)

    Marrs, C. C.; Harkonen, D. L.; Okeefe, J. V.

    1974-01-01

    Results are presented for full scale ground static acoustic tests of over-area conical nozzles and a lobe nozzle installed on the Augmentor Wing Jet STOL Research Aircraft, a modified C8A Buffalo. The noise levels and spectrums of the test nozzles are compared against those of the standard conical nozzle now in use on the aircraft. Acoustic evaluations at 152 m (500 ft), 304 m (1000 ft), and 1216 m (4000 ft) are made at various engine power settings with the emphasis on approach and takeoff power. Appendix A contains the test log and propulsion calculations. Appendix B gives the original test plan, which was closely adhered to during the test. Appendix C describes the acoustic data recording and reduction systems, with calibration details.

  8. Waste-Management Education and Research Consortium (WERC) annual progress report, 1992--1993. Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-02-15

    This report contains the following appendices: Appendix A - Requirements for Undergraduate Level; Appendix B - Requirements for Graduate Level; Appendix C - Graduate Degree In Environmental Engineeringat New Mexico State University; Appendix D - Non-degree Certificate program; Appendix E - Curriculum for Associate Degree Program in Radioactive & Hazardous Waste Materials; Appendix F - Curriculum for NCC Program in Earth & Environmental Sciences; Appendix G - Brochure of 1992 Teleconference Series; Appendix H - Sites for Hazardous/Radioactive Waste Management Series; Appendix I - WERC Interactive Television Courses; Appendix J - WERC Research Seminar Series Brochures; Appendix K - Summarymore » of Technology Development of the Third Year; Appendix L - List of Major Publications Resulting From WERC; Appendix M - Types of Equipment at WERC Laboratories; and Appendix N - WERC Newsletter Examples.« less

  9. Waste-Management Education and Research Consortium (WERC) annual progress report, 1992--1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eiceman, Gary A.; King, J. Phillip; Smith, Geoffrey B.

    1993-02-15

    This report contains the following appendices: Appendix A - Requirements for Undergraduate Level; Appendix B - Requirements for Graduate Level; Appendix C - Graduate Degree In Environmental Engineeringat New Mexico State University; Appendix D - Non-degree Certificate program; Appendix E - Curriculum for Associate Degree Program in Radioactive Hazardous Waste Materials; Appendix F - Curriculum for NCC Program in Earth Environmental Sciences; Appendix G - Brochure of 1992 Teleconference Series; Appendix H - Sites for Hazardous/Radioactive Waste Management Series; Appendix I - WERC Interactive Television Courses; Appendix J - WERC Research Seminar Series Brochures; Appendix K - Summary of Technologymore » Development of the Third Year; Appendix L - List of Major Publications Resulting From WERC; Appendix M - Types of Equipment at WERC Laboratories; and Appendix N - WERC Newsletter Examples.« less

  10. 36 CFR Appendix to Part 1193 - Advisory Guidance

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... weight of these factors is a compliance issue, under the jurisdiction of the Federal Communications... information and documentation includes user guides, installation guides, and product support communications...” rather than using the space bar. This is necessary because Braille translation software relies on the...

  11. 10 CFR 50.48 - Fire protection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... from the date it was superseded. (4) Each applicant for a design approval, design certification, or... design features for the standard plant necessary to demonstrate compliance with Criterion 3 of appendix A.... (v) Existing cables. In lieu of installing cables meeting flame propagation tests as required by...

  12. 32 CFR Appendix C to Part 247 - Mailing of DoD Newspapers, Magazines, CE Guides, and Installation Maps; Sales and Distribution of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Government Agencies, Members of Congress, libraries, hospitals, schools, and depositories. f. Mailing of an... by the commander, such as the foyers of open messes or exchanges. They will be placed only in stands...

  13. Public Library Automation Report: Circulation [and] Appendix.

    ERIC Educational Resources Information Center

    Gotanda, Masae; And Others

    An online circulation system--ULISYS (the Universal Library System Ltd.) manufactured by Digital Equipment Corporation (DEC)--is being installed in the Hawaii State Library, Kaneohe Regional Library, Kailua Community Library and Waimanalo Community/School Library. These libraries are the first users of a statewide online circulation system…

  14. Old Hickory Lake Appendix M To Park Management Shoreline Management Plan

    DTIC Science & Technology

    2014-07-01

    The Division of Water Resources of the Tennessee Department of Environment and Conservation regulates septic tanks , drain fields, and other...sanitary facilities on adjoining private property. The construction or installation of a new privately owned septic tank , drain field, or holding tank on

  15. 49 CFR Appendix A to Part 222 - Approved Supplementary Safety Measures

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION USE OF LOCOMOTIVE HORNS AT PUBLIC HIGHWAY-RAIL GRADE... safety measures (SSMs) that may be installed at highway-rail grade crossings within quiet zones for risk... research and demonstration projects are completed and data is gathered and refined. Sections B and C govern...

  16. 49 CFR Appendix A to Part 222 - Approved Supplementary Safety Measures

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION USE OF LOCOMOTIVE HORNS AT PUBLIC HIGHWAY-RAIL GRADE... safety measures (SSMs) that may be installed at highway-rail grade crossings within quiet zones for risk... research and demonstration projects are completed and data is gathered and refined. Sections B and C govern...

  17. 49 CFR Appendix A to Part 222 - Approved Supplementary Safety Measures

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION USE OF LOCOMOTIVE HORNS AT PUBLIC HIGHWAY-RAIL GRADE... safety measures (SSMs) that may be installed at highway-rail grade crossings within quiet zones for risk... research and demonstration projects are completed and data is gathered and refined. Sections B and C govern...

  18. 49 CFR Appendix A to Part 222 - Approved Supplementary Safety Measures

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION USE OF LOCOMOTIVE HORNS AT PUBLIC HIGHWAY-RAIL GRADE... safety measures (SSMs) that may be installed at highway-rail grade crossings within quiet zones for risk... research and demonstration projects are completed and data is gathered and refined. Sections B and C govern...

  19. 40 CFR Appendix Viii to Part 86 - Aging Bench Equipment and Procedures

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Exhaust System Installation a. The entire catalyst(s)-plus-oxygen-sensor(s) system, together with all... catalysts, the entire catalyst system including all catalysts, all oxygen sensors and the associated exhaust... first catalyst at its longitudinal axis). Alternatively, the feed gas temperature just before the...

  20. 40 CFR Appendix Viii to Part 86 - Aging Bench Equipment and Procedures

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Exhaust System Installation a. The entire catalyst(s)-plus-oxygen-sensor(s) system, together with all... catalysts, the entire catalyst system including all catalysts, all oxygen sensors and the associated exhaust... first catalyst at its longitudinal axis). Alternatively, the feed gas temperature just before the...

  1. 7 CFR Appendix B to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs Greater Than $200,000

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...

  2. 7 CFR Appendix B to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs Greater Than $200,000

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...

  3. Technical Approach for In Situ Biological Treatment Research: Bench- Scale Experiments

    DTIC Science & Technology

    1993-08-01

    1 CONVERSION FACTORS, NON-SI TO SI (METRIC) UNITS OF MEASUREMENT . . 5 PART I: INTRODUCTION...141 REFERENCES ....................... .............................. 142 TABLES 1 -4 APPENDIX A: IN SITU IMPLEMENTATION CASE STUDIES...TREATMENT RESEARCH: BENCH-SCALE EXPERIMENTS PART I: INTRODUCTION Background 1 . Many US Army installations have areas of contamination requiring

  4. 32 CFR Appendix A to Part 310 - Safeguarding Personally Identifiable Information (PII)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... all computer products containing classified data in accordance with the requirements of DoD 5200.1-R... computer environments outside the data processing installation (such as, remote job entry stations... process classified material have adequate procedures and security for the purposes of this Regulation...

  5. 32 CFR Appendix A to Part 310 - Safeguarding Personally Identifiable Information (PII)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... all computer products containing classified data in accordance with the requirements of DoD 5200.1-R... computer environments outside the data processing installation (such as, remote job entry stations... process classified material have adequate procedures and security for the purposes of this Regulation...

  6. 32 CFR Appendix A to Part 310 - Safeguarding Personally Identifiable Information (PII)

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... all computer products containing classified data in accordance with the requirements of DoD 5200.1-R... computer environments outside the data processing installation (such as, remote job entry stations... process classified material have adequate procedures and security for the purposes of this Regulation...

  7. 32 CFR Appendix A to Part 310 - Safeguarding Personally Identifiable Information (PII)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... all computer products containing classified data in accordance with the requirements of DoD 5200.1-R... computer environments outside the data processing installation (such as, remote job entry stations... process classified material have adequate procedures and security for the purposes of this Regulation...

  8. 32 CFR Appendix A to Part 310 - Safeguarding Personally Identifiable Information (PII)

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... all computer products containing classified data in accordance with the requirements of DoD 5200.1-R... computer environments outside the data processing installation (such as, remote job entry stations... process classified material have adequate procedures and security for the purposes of this Regulation...

  9. DoD Sustainability Application Guide for Historic Properties

    DTIC Science & Technology

    2007-05-01

    319 Appendix B: Survey of DoD Sustainability Projects ...................................................................... 322...that support sustainability objectives; 2. conducting a survey of existing LEED-EB qualifying historic building pro- jects and assessing them to...site. While military installations have typically conducted archaeological surveys , all proposed ground-disturbing activi- ties located in areas with

  10. 14 CFR Appendix A to Part 23 - Simplified Design Load Criteria

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... imposed when the particular items are installed in the airplane. The engine mount, however, must be.... (d) Supplementary conditions; rear lift truss; engine torque; side load on engine mount. Each of the... weight. (2) Each engine mount and its supporting structures must be designed for the maximum limit torque...

  11. 14 CFR Appendix A to Part 23 - Simplified Design Load Criteria

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... imposed when the particular items are installed in the airplane. The engine mount, however, must be.... (d) Supplementary conditions; rear lift truss; engine torque; side load on engine mount. Each of the... weight. (2) Each engine mount and its supporting structures must be designed for the maximum limit torque...

  12. 14 CFR Appendix A to Part 23 - Simplified Design Load Criteria

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... imposed when the particular items are installed in the airplane. The engine mount, however, must be.... (d) Supplementary conditions; rear lift truss; engine torque; side load on engine mount. Each of the... weight. (2) Each engine mount and its supporting structures must be designed for the maximum limit torque...

  13. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the public. (c) Redundancy. A flight termination system must use redundant components that are... linear shaped charge need not be redundant if it initiates at both ends, and the initiation source for... period of heating or cooling. Paragraphs (c)(2) through (c)(6) of this section identify the required...

  14. 29 CFR 1910.66 - Powered platforms for building maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section. (c) Assurance. (1) Building owners of new installations shall inform the employer before each use... the information required in paragraph (c)(1) of this section on the results of a field test of the... meet the requirements of paragraph (I)(c)(10) of appendix C. (4) The employer shall not permit...

  15. 77 FR 65148 - Airworthiness Directives; Intertechnique Aircraft Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... Intertechnique Aircraft Systems oxygen mask regulators. This proposed AD was prompted by a report of a... of the suspect batches may have become installed on an Oxygen Mask Regulator, the serial number (s/n... Oxygen Mask Regulators identified by s/n and P/N in Appendix II of the SB. This condition, if not...

  16. 7 CFR Appendix A to Part 3015 - Definitions

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... “Acquisition cost” of an item of purchased equipment means the net invoice price of the equipment. It includes... equipment useable for the purpose for which it was acquired. Other charges, such as the cost of installation... equipment. If an item of equipment is acquired by trading in another item and paying an additional amount...

  17. 32 CFR Appendix A to Part 86 - Criminal History Background Check Procedures

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... responsibility in ensuring a safe and secure environment for children within DoD activities or private... installation level. An IRC will be completed on individuals with a DoD affiliation such as living or working on... checks through the SCHR to personnel offices working with law enforcement or investigative agencies. They...

  18. Emergency Preparedness technology support to the Health and Safety Executive (HSE), Nuclear Installations Inspectorate (NII) of the United Kingdom. Appendix A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O`Kula, K.R.

    1994-03-01

    The Nuclear Installations Inspectorate (NII) of the United Kingdom (UK) suggested the use of an accident progression logic model method developed by Westinghouse Savannah River Company (WSRC) and Science Applications International Corporation (SAIC) for K Reactor to predict the magnitude and timing of radioactivity releases (the source term) based on an advanced logic model methodology. Predicted releases are output from the personal computer-based model in a level-of-confidence format. Additional technical discussions eventually led to a request from the NII to develop a proposal for assembling a similar technology to predict source terms for the UK`s advanced gas-cooled reactor (AGR) type.more » To respond to this request, WSRC is submitting a proposal to provide contractual assistance as specified in the Scope of Work. The work will produce, document, and transfer technology associated with a Decision-Oriented Source Term Estimator for Emergency Preparedness (DOSE-EP) for the NII to apply to AGRs in the United Kingdom. This document, Appendix A is a part of this proposal.« less

  19. Production Facility Prototype Blower 1000 Hour Test Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woloshun, Keith Albert; Dale, Gregory E.; Romero, Frank Patrick

    2016-10-18

    The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GMmore » 12.4 blower was selected, and is now installed at the LANL facility for target and component flow testing. Two extended tests of >1000 hr operation have been completed. Those results and discussion thereof are reported herein. Also included in Appendix A is the detailed description of the blower and its installation, while Appendix B documents the pressure vessel design analysis. The blower has been operated for 1000 hours as a preliminary investigation of long-term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced. Test results and conclusions are in Appendix B.« less

  20. Installation of C-6533(XE-2)/ARC ICS in UH-1H helicopter

    NASA Astrophysics Data System (ADS)

    Hnat, J. A.

    1980-07-01

    This report documents the results of the installation of the C-6533(XE-2)/ARC ICS in UH-1H helicopter. Installation was performed at the AEL, Inc., Monmouth County Airport facility. Design of each installation was coordinated and approved by the Government. The mechanical and electrical installation drawings for the helicopter are attached as Appendix A of this report. The new ICS system consisted of new cabling, new intercoms and helmets rewired with new microphones. All four crew stations of the helicopter were reconfigured with the new system. Existing cabling for the standard ICS system remained in the aircraft but was securely stowed for later restoration of the aircraft. The helmets (4) were rewired using separate jacks for headphones and microphone lines. Transmit and receive cables were installed in the aircraft with a minimum separation of one inch between cables. A junction box was fabricated and installed on the aft end of the console to house the fan-out terminal strips. Transmit and receive lines' separation was maintained in the junction box. During the test phase the onboard radios were used with the new ICS system.

  1. Renewable Energy From Animal Biomass – Farm Methane

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    St. Amour, Kenneth

    2013-08-31

    The major goal of the project is to develop 2 anaerobic digesters on family farms in rural Vermont. We have accomplished half of that goal, with 1 digester operating on the Gebbie Maplehurst Farm in Greensboro, Vermont. The 2nd digester is planned as a student demonstration unit at Vermont Technical College in Randolph Center, Vermont. That half of the project has not commenced. We will limit our discussion to the Gebbie Maplehurst Farm project. A 150MW generator is installed on the farm and is producing electricity which is being sold as part of the Standard Offer Program within the Statemore » of Vermont. The induction generator is the first of its kind manufactured by Martin Machinery of Latham, Missouri. The project is currently generating approximately 15% - 20% of the capacity as shown in appendix I. However, it is anticipated that details will quickly be worked out to increase that capacity factor.« less

  2. The systematic evolution of a NASA software technology, Appendix C

    NASA Technical Reports Server (NTRS)

    Deregt, M. P.; Dulfer, J. E.

    1972-01-01

    A long range program is described whose ultimate purpose is to make possible the production of software in NASA within predictable schedule and budget constraints and with major characteristics such as size, run-time, and correctness predictable within reasonable tolerances. As part of the program a pilot NASA computer center will be chosen to apply software development and management techniques systematically and determine a set which is effective. The techniques will be developed by a Technology Group, which will guide the pilot project and be responsible for its success. The application of the technology will involve a sequence of NASA programming tasks graduated from simpler ones at first to complex systems in late phases of the project. The evaluation of the technology will be made by monitoring the operation of the software at the users' installations. In this way a coherent discipline for software design, production maintenance, and management will be evolved.

  3. 32 CFR Appendix E to Part 68 - Addendum for Education Services Between [Name of Educational Institution] and the U.S. Navy

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... DoD installation facility, including office space, classrooms, laboratories, or other features, that... readiness center, armory, unit, etc.), or recruiting center (leased space inside a shopping mall or office... afforded the opportunity to complete their high school education through a state-funded or Service...

  4. 14 CFR Appendix N to Part 25 - Fuel Tank Flammability Exposure and Reliability Analysis

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the performance of a flammability reduction means (FRM) if installed. (c) The following definitions... average fuel temperature within the fuel tank or different sections of the tank if the tank is subdivided... the flight time, and the post-flight time is a constant 30 minutes. (c) Flammable. With respect to a...

  5. 14 CFR Appendix N to Part 25 - Fuel Tank Flammability Exposure and Reliability Analysis

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the performance of a flammability reduction means (FRM) if installed. (c) The following definitions... average fuel temperature within the fuel tank or different sections of the tank if the tank is subdivided... the flight time, and the post-flight time is a constant 30 minutes. (c) Flammable. With respect to a...

  6. 32 CFR 154.18 - Certain positions not necessarily requiring access to classified information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Directive 5210.65. 1 1 See footnote 1 to § 154.2(c). (l) Education and orientation personnel. Persons selected for duties in connection with programs involving the education and orientation of military... installations in the United States. Non-US citizens from a country listed in appendix G shall be required to...

  7. 5 CFR Appendix A to Subpart I of... - Schedule of Pay Differentials Authorized for Hazardous Duty Under Subpart I

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ice, e.g., installing scientific instruments and making observations for research purposes 25 First... subject. (a) Participating as a subject in diving research tests which seek to establish limits for safe... research vehicle. Duty aboard a submarine or deep research vehicle when it submerges 25 Do. (2) Diving...

  8. 5 CFR Appendix A to Subpart I of... - Schedule of Pay Differentials Authorized for Hazardous Duty Under Subpart I

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ice, e.g., installing scientific instruments and making observations for research purposes 25 First... subject. (a) Participating as a subject in diving research tests which seek to establish limits for safe... research vehicle. Duty aboard a submarine or deep research vehicle when it submerges 25 Do. (2) Diving...

  9. 5 CFR Appendix A to Subpart I of... - Schedule of Pay Differentials Authorized for Hazardous Duty Under Subpart I

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ice, e.g., installing scientific instruments and making observations for research purposes 25 First... subject. (a) Participating as a subject in diving research tests which seek to establish limits for safe... research vehicle. Duty aboard a submarine or deep research vehicle when it submerges 25 Do. (2) Diving...

  10. Nanoose Range Current Characteristics at 274m Depth

    DTIC Science & Technology

    1977-05-01

    BUOYANT iL 41 4 , PLASTIC SLEEVES OVER NYLON ROPES SSHACKLE TO PAD EYES Si-BOMISI Figure 3. VACM Installation Atop BOMIS 14 L Report 13711 lij~ j I. 54 I...1__ H 4 *Report 1311 Appendix A TABLE 5.. INDICATED PEAK TIDAL CURRENqT CARACTERISTICS @ 30.5 meters: There is no apparent preferred ebb or flood

  11. 49 CFR Appendix A to Part 222 - Approved Supplementary Safety Measures

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... crossings located within New Partial Quiet Zones shall be closed from 10 p.m. until 7 a.m. every day. Public... apply only to New Quiet Zones or New Partial Quiet Zones. Constant warning time devices and power-out...-Rule Partial Quiet Zones are renewed, or new automatic warning device systems are installed, power-out...

  12. 29 CFR Appendix B to Part 510 - Nonmanufacturing Industries Eligible for Minimum Wage Phase-In

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 7374 1 Computer processing and data preparation and processing services. 7379 1 Computer related... industries (except those in major groups 01, 02, 08, and 09, pertaining to agriculture) for which data were... incorporated by reference in these regulations (§ 510.21). The data in this appendix are presented by major...

  13. 29 CFR Appendix B to Part 510 - Nonmanufacturing Industries Eligible for Minimum Wage Phase-In

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... 7374 1 Computer processing and data preparation and processing services. 7379 1 Computer related... industries (except those in major groups 01, 02, 08, and 09, pertaining to agriculture) for which data were... incorporated by reference in these regulations (§ 510.21). The data in this appendix are presented by major...

  14. The evolving management of the appendix mass in the era of laparoscopy and interventional radiology.

    PubMed

    Forsyth, James; Lasithiotakis, Konstantinos; Peter, Mark

    2017-04-01

    An appendix mass is the result of a walled-off perforation of the appendix which localises, resulting in a mass and it is encountered in up to 7% of patients presenting with acute appendicitis. However, its management is controversial due to the lack of high level evidence. This review article sets out a rationale diagnostic and therapeutic strategy for the appendix mass based upon up-to-date available evidence. A literature review of the investigation and management of appendix mass/complicated appendicitis was undertaken using PubMed, EMBASE and Google Scholar. No prospective studies were identified. The great majority of recent evidence supports a conservative management approach avoiding urgent appendicectomy because of the high risk of major complications and bowel resection. Appendix abscesses over 5 cm in diameter and persistent abscesses should be drained percutaneously along with antibiotics. Appendix phlegmon should be treated with antibiotics alone. Surgery is reserved for patients who fail conservative treatment. Routine interval appendicectomy is not recommended, but should be considered in the context of persistent faecolith, ongoing right iliac fossa pain, recurrent appendicitis and appendix mass persistent beyond 2 weeks. Clinicians should be particularly wary of patients with appendix mass aged over 40 and those with features suggesting malignancy. Copyright © 2016 Royal College of Surgeons of Edinburgh (Scottish charity number SC005317) and Royal College of Surgeons in Ireland. Published by Elsevier Ltd. All rights reserved.

  15. Test plan and report for Space Shuttle launch environment testing of Bergen cable technology safety cable

    NASA Technical Reports Server (NTRS)

    Ralph, John

    1992-01-01

    Bergen Cable Technology (BCT) has introduced a new product they refer to as 'safety cable'. This product is intended as a replacement for lockwire when installed per Aerospace Standard (AS) 4536 (included in Appendix D of this document). Installation of safety cable is reportedly faster and more uniform than lockwire. NASA/GSFC proposes to use this safety cable in Shuttle Small Payloads Project (SSPP) applications on upcoming Shuttle missions. To assure that BCT safety cable will provide positive locking of fasteners equivalent to lockwire, the SSPP will conduct vibration and pull tests of the safety cable.

  16. 20 CFR 404.1525 - Listing of Impairments in appendix 1.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Impairments (the listings) is in appendix 1 of this subpart. It describes for each of the major body systems..., regardless of his or her age, education, or work experience. (b) How is appendix 1 organized? There are two... relationship with their counterparts in part A. (c) How do we use the listings? (1) Each body system section in...

  17. 14 CFR Appendix D to Part 43 - Scope and Detail of Items (as Applicable to the Particular Aircraft) To Be Included in Annual and...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... internal tolerances. (4) Engine mount—for cracks, looseness of mounting, and looseness of engine to mount... aircraft and aircraft engine. (b) Each person performing an annual or 100-hour inspection shall inspect...) improper operation. (5) Flight and engine controls—for improper installation and improper operation. (6...

  18. 14 CFR Appendix D to Part 43 - Scope and Detail of Items (as Applicable to the Particular Aircraft) To Be Included in Annual and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... internal tolerances. (4) Engine mount—for cracks, looseness of mounting, and looseness of engine to mount... aircraft and aircraft engine. (b) Each person performing an annual or 100-hour inspection shall inspect...) improper operation. (5) Flight and engine controls—for improper installation and improper operation. (6...

  19. 14 CFR Appendix D to Part 43 - Scope and Detail of Items (as Applicable to the Particular Aircraft) To Be Included in Annual and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... internal tolerances. (4) Engine mount—for cracks, looseness of mounting, and looseness of engine to mount... aircraft and aircraft engine. (b) Each person performing an annual or 100-hour inspection shall inspect...) improper operation. (5) Flight and engine controls—for improper installation and improper operation. (6...

  20. 14 CFR Appendix D to Part 43 - Scope and Detail of Items (as Applicable to the Particular Aircraft) To Be Included in Annual and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... internal tolerances. (4) Engine mount—for cracks, looseness of mounting, and looseness of engine to mount... aircraft and aircraft engine. (b) Each person performing an annual or 100-hour inspection shall inspect...) improper operation. (5) Flight and engine controls—for improper installation and improper operation. (6...

  1. 14 CFR Appendix - Special Federal Aviation Regulation No. 109

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the nearest exit edges, is allowed only once on each side of the fuselage. 8. Emergency Exit Signs. In lieu of the requirements of § 25.811(d)(1) and (2) a single sign at each exit may be installed provided... at least 1-inch high on a white background at least 2 inches high. These signs may be internally...

  2. 40 CFR Appendix Ix to Part 266 - Methods Manual for Compliance With the BIF Regulations

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... However, it is more time-consuming and is recommended only if the basic approach fails to meet the risk... used to evaluate the acceptability of the CEMS at the time of its installation or whenever specified in regulations or permits. The procedures are not designed to evaluate CEMS performance over an extended period...

  3. 40 CFR Appendix Ix to Part 266 - Methods Manual for Compliance With the BIF Regulations

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... However, it is more time-consuming and is recommended only if the basic approach fails to meet the risk... used to evaluate the acceptability of the CEMS at the time of its installation or whenever specified in regulations or permits. The procedures are not designed to evaluate CEMS performance over an extended period...

  4. 40 CFR Appendix Ix to Part 266 - Methods Manual for Compliance With the BIF Regulations

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... However, it is more time-consuming and is recommended only if the basic approach fails to meet the risk... used to evaluate the acceptability of the CEMS at the time of its installation or whenever specified in regulations or permits. The procedures are not designed to evaluate CEMS performance over an extended period...

  5. Economic Evaluation of Single-Family-Residence Solar-Energy Installation

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Long-term economic performance of a commercial solar-energy system was analyzed and used to predict economic performance at four additional sites. Analysis described in report was done to demonstrate viability of design over a broad range of environmental/economic conditions. Report contains graphs and tables that present evaluation procedure and results. Also contains appendixes that aid in understanding methods used.

  6. 32 CFR Appendix D to Part 68 - Addendum for Education Services Between [Name of Educational Institution] and the U.S. Marine Corps

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Institution provides instruction via media. (4) When operating on a Marine base, provide library services to the Marine Corps base/installation for students in the form of research and reference materials (e.g... home campus. Services shall also include research and reference material in sufficient quantity to meet...

  7. 32 CFR Appendix D to Part 68 - Addendum for Education Services Between [Name of Educational Institution] and the U.S. Marine Corps

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Institution provides instruction via media. (4) When operating on a Marine base, provide library services to the Marine Corps base/installation for students in the form of research and reference materials (e.g... home campus. Services shall also include research and reference material in sufficient quantity to meet...

  8. Columbia Accident Investigation Board Report. Volume Two

    NASA Technical Reports Server (NTRS)

    Barry, J. R.; Jenkins, D. R.; White, D. J.; Goodman, P. A.; Reingold, L. A.

    2003-01-01

    Volume II of the Report contains appendices that were cited in Volume I. The Columbia Accident Investigation Board produced many of these appendices as working papers during the investigation into the February 1, 2003 destruction of the Space Shuttle Columbia. Other appendices were produced by other organizations (mainly NASA) in support of the Board investigation. In the case of documents that have been published by others, they are included here in the interest of establishing a complete record, but often at less than full page size. Contents include: CAIB Technical Documents Cited in the Report: Reader's Guide to Volume II; Appendix D. a Supplement to the Report; Appendix D.b Corrections to Volume I of the Report; Appendix D.1 STS-107 Training Investigation; Appendix D.2 Payload Operations Checklist 3; Appendix D.3 Fault Tree Closure Summary; Appendix D.4 Fault Tree Elements - Not Closed; Appendix D.5 Space Weather Conditions; Appendix D.6 Payload and Payload Integration; Appendix D.7 Working Scenario; Appendix D.8 Debris Transport Analysis; Appendix D.9 Data Review and Timeline Reconstruction Report; Appendix D.10 Debris Recovery; Appendix D.11 STS-107 Columbia Reconstruction Report; Appendix D.12 Impact Modeling; Appendix D.13 STS-107 In-Flight Options Assessment; Appendix D.14 Orbiter Major Modification (OMM) Review; Appendix D.15 Maintenance, Material, and Management Inputs; Appendix D.16 Public Safety Analysis; Appendix D.17 MER Manager's Tiger Team Checklist; Appendix D.18 Past Reports Review; Appendix D.19 Qualification and Interpretation of Sensor Data from STS-107; Appendix D.20 Bolt Catcher Debris Analysis.

  9. 20 CFR 404.1569 - Listing of Medical-Vocational Guidelines in appendix 2.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... factors and residual functional capacity is not the same as the corresponding criterion of a rule. In... national economy. Appendix 2 provides rules using this data reflecting major functional and vocational...

  10. 7 CFR 3300.13 - Determination of the efficiency of the thermal appliances as installed in the insulated body.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... INTERNATIONAL CARRIAGE OF PERISHABLE FOODSTUFFS AND ON THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP... procedures in ATP, Annex 1, Appendix 2, paragraphs 31-40 and 43-47 shall be used. A report of each test shall be completed on a form corresponding to the pertinent test report model prescribed in ATP, Annex 1...

  11. 7 CFR 3300.13 - Determination of the efficiency of the thermal appliances as installed in the insulated body.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... INTERNATIONAL CARRIAGE OF PERISHABLE FOODSTUFFS AND ON THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP... procedures in ATP, Annex 1, Appendix 2, paragraphs 31-40 and 43-47 shall be used. A report of each test shall be completed on a form corresponding to the pertinent test report model prescribed in ATP, Annex 1...

  12. 7 CFR 3300.13 - Determination of the efficiency of the thermal appliances as installed in the insulated body.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... INTERNATIONAL CARRIAGE OF PERISHABLE FOODSTUFFS AND ON THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP... procedures in ATP, Annex 1, Appendix 2, paragraphs 31-40 and 43-47 shall be used. A report of each test shall be completed on a form corresponding to the pertinent test report model prescribed in ATP, Annex 1...

  13. Using archived ITS data to measure the operational benefits of a system-wide adaptive ramp metering system : appendix online\\0x20106: OR\\0x2010217 NB time-space speed contour plots with meter activations.

    DOT National Transportation Integrated Search

    2008-12-01

    Programmable logic controllers (PLCs) were installed at several key ramps with the assistance of the City of Portland and used to capture additional data about ramp operations that are not otherwise logged. The data include include the activation and...

  14. Building a Gateway for the CD-ROM Network: A Step toward the Virtual Library with the Virtual Microsystems V-Server.

    ERIC Educational Resources Information Center

    Sylvia, Margaret

    1993-01-01

    Describes one college library's experience with a gateway for dial-in access to its CD-ROM network to increase access to automated index searching for students off-campus. Hardware and software choices are discussed in terms of access, reliability, affordability, and ease of use. Installation problems are discussed, and an appendix lists product…

  15. 20 CFR 220.134 - Medical-vocational guidelines in appendix 2 of this part.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... vocational factors and residual functional capacity is not the same as the corresponding criterion of a rule... economy. Appendix 2 of this part provides rules using this data reflecting major functional and vocational...

  16. Appendix Y. The Integrated Communications Experiment (ICE) Summary.

    ERIC Educational Resources Information Center

    Coffin, Robert

    This appendix describes the Integrated Communications Experiment (ICE), a comprehensive computer software capability developed for the ComField Project. Each major characteristic of the data processing system is treated separately: natural language processing, flexibility, noninterference with the educational process, multipurposeness,…

  17. Airport landside volume V : appendix B ALSIM subroutines.

    DOT National Transportation Integrated Search

    1982-06-01

    This Appendix describes the operation of ten subroutines used to support the AUXILIARY and MAIN programs of ALSIM. Flow charts and listings of all programs are provided. The major portion describes the FORTRAN subprogram FORTM which is used to read i...

  18. Tidd hot gas clean up program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Final Report on the Tidd Hot Gas Clean Up Program covers the period from initial Proof-of-Concept testing in August, 1990, through final equipment inspections in May, 1995. The Tidd Hot Gas Clean Up (HGCU) system was installed in the Tidd Pressurized Fluidized Bed Combustion (PFBC) Demonstration Plant, which is the first utility-scale PFBC plant in the United States. Detailed design work on the project began in July, 1990, and site construction began in December, 1991. Initial operation of the system occurred in May, 1992, and the hot gas filter was commissioned in October, 1992. The test program ended inmore » March, 1995, when the Tidd Plant was shut down following its four-year test program. Section 1.0 of this report is an executive summary of the project covering the project background, system description, test results and conclusions. Section 2.0 is an introduction covering the program objectives and schedule. Section 3.0 provides detailed descriptions of the system and its major components. Section 4.0 provides detailed results of all testing including observations and posttest inspection results. Sections 5.0 and 6.0 list the program conclusions and recommendations, respectively. Appendix I is a report prepared by Southern Research Institute on the properties of Tidd PFBC ash sampled during the test program. Appendix II is a report prepared by Westinghouse STC on the performance of candle filter fail-safe regenerator devices.« less

  19. Demonstration of coal reburning for cyclone boiler NO{sub x} control. Appendix, Book 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Based on the industry need for a pilot-scale cyclone boiler simulator, Babcock Wilcox (B&W) designed, fabricated, and installed such a facility at its Alliance Research Center (ARC) in 1985. The project involved conversion of an existing pulverized coal-fired facility to be cyclone-firing capable. Additionally, convective section tube banks were installed in the upper furnace in order to simulate a typical boiler convection pass. The small boiler simulator (SBS) is designed to simulate most fireside aspects of full-size utility boilers such as combustion and flue gas emissions characteristics, fireside deposition, etc. Prior to the design of the pilot-scale cyclone boiler simulator,more » the various cyclone boiler types were reviewed in order to identify the inherent cyclone boiler design characteristics which are applicable to the majority of these boilers. The cyclone boiler characteristics that were reviewed include NO{sub x} emissions, furnace exit gas temperature (FEGT) carbon loss, and total furnace residence time. Previous pilot-scale cyclone-fired furnace experience identified the following concerns: (1) Operability of a small cyclone furnace (e.g., continuous slag tapping capability). (2) The optimum cyclone(s) configuration for the pilot-scale unit. (3) Compatibility of NO{sub x} levels, carbon burnout, cyclone ash carryover to the convection pass, cyclone temperature, furnace residence time, and FEGT.« less

  20. Using archived ITS data to measure the operational benefits of a system-wide adaptive ramp metering system : appendix online\\0x20101 : I\\0x2010205 NB time\\0x2010space speed contour plots with meter activations.

    DOT National Transportation Integrated Search

    2008-12-01

    Programmable logic controllers (PLCs) were installed at several key ramps with the assistance of the City of Portland and used to capture additional data about ramp operations that are not otherwise logged. The data include the activation and deactiv...

  1. 7 CFR Appendix A to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs of $200,000 or Less

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of the wind turbine is 100kW or smaller and with a generator hub height of 120 feet or less. Small... demonstrate the amount of local wind resource where the small wind turbine is to be installed. Indicate the... of the individual wind turbine(s) is larger than 100kW. (a) Qualifications of key project service...

  2. 7 CFR Appendix A to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs of $200,000 or Less

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of the wind turbine is 100kW or smaller and with a generator hub height of 120 feet or less. Small... demonstrate the amount of local wind resource where the small wind turbine is to be installed. Indicate the... of the individual wind turbine(s) is larger than 100kW. (a) Qualifications of key project service...

  3. Installation Restoration Program. Phase II: Stage 1 Problem Confirmation Study, Duluth International Airport, Duluth, Minnesota.

    DTIC Science & Technology

    1984-10-01

    8 iii "i t-. Table of Contents (cont.) Section Title Page -APPENDIX A Acronyms, Definitions, Nomenclature and Units of Measure B Scope of Work, Task...Identification/Records Search Phase II - Problem Confirmation and Quantification Phase III - Technology Base Development Phase IV - Corrective Action Only...Problem Identification/Records Search Phase II - Problem Confirmation and Quantification Phase III - Technology Base Development Phase IV - Corrective

  4. Installation Restoration Program. Idaho Air National Guard, Gowen Field, Boise, Idaho, Site Inspection Report. Volume 2

    DTIC Science & Technology

    1989-03-21

    Seattle.Washington 98108 (206)767-5060 Chemistr . Microbklog. and Technical Services 1. TO: Science Applications International Corporation LABORATORY I.D...Certificate 940 South HarneySt.. Seattle.Washington 98108 (206)767-5060 ) Chemistr . Micrcbiob .and Technical Services TO: Science Applications...HarnreySt Seattle.Washington 98108 (206)767-5060 Chemistr " Microbiocoy and Technical Services SAIC LABORATORY NO. 3894 APPENDIX A Method Blank

  5. Installation Restoration Program. Phase I: Records Search Goodfellow Air Force Base, Texas.

    DTIC Science & Technology

    1985-03-01

    CHDRO - ARSENIC SARIUM, CADMIUM MIUM. COPPER. IRON, DIS- DIS- DIS- DIS- DIS- DIS- SOLVED SOLVED SOLVED SOLVED SOLVED SOLVED TIME (UOIL (UCIL (UGIL (UG/L... cadmium , chromium, copper, iron, lead, manganese, mercury, nickel, silver, and zinc. The recommended parameters include those compounds known or...8217. ... . . -. * -:,-..’... .... ’.... ...’. .’..".-... ... -......- . ..............-............... . ..... .. APPENDIX A (Continued, Page 2 of 7) Cadmium A metal used in batteries and other industrial

  6. 14 CFR Appendix B to Part 121 - Airplane Flight Recorder Specification

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Reverse (Discrete) 1 (per 4 seconds per engine) Ground Spoiler Position/Speed Brake Selection Full Range... aircraft ±100 to ±700 ft (See Table 1, TSO-C51a) 1 5′ to 35′ 1 Airspeed 50 KIAS to V so, and V so to 1.2 VD... Accurate Systems Installed (IMS Equipped Aircraft Only) 1 0.2% 2 If additional recording capacity is...

  7. 14 CFR Appendix B to Part 121 - Airplane Flight Recorder Specification

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Reverse (Discrete) 1 (per 4 seconds per engine) Ground Spoiler Position/Speed Brake Selection Full Range... aircraft ±100 to ±700 ft (See Table 1, TSO-C51a) 1 5′ to 35′ 1 Airspeed 50 KIAS to V so, and V so to 1.2 VD... Accurate Systems Installed (IMS Equipped Aircraft Only) 1 0.2% 2 If additional recording capacity is...

  8. 14 CFR Appendix B to Part 121 - Airplane Flight Recorder Specification

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Reverse (Discrete) 1 (per 4 seconds per engine) Ground Spoiler Position/Speed Brake Selection Full Range... aircraft ±100 to ±700 ft (See Table 1, TSO-C51a) 1 5′ to 35′ 1 Airspeed 50 KIAS to V so, and V so to 1.2VD... Accurate Systems Installed (IMS Equipped Aircraft Only) 1 0.2% 2 If additional recording capacity is...

  9. 14 CFR Appendix B to Part 121 - Airplane Flight Recorder Specification

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Reverse (Discrete) 1 (per 4 seconds per engine) Ground Spoiler Position/Speed Brake Selection Full Range... aircraft ±100 to ±700 ft (See Table 1, TSO-C51a) 1 5′ to 35′ 1 Airspeed 50 KIAS to V so, and V so to 1.2 VD... Accurate Systems Installed (IMS Equipped Aircraft Only) 1 0.2% 2 If additional recording capacity is...

  10. STS-61 Space Shuttle mission report

    NASA Technical Reports Server (NTRS)

    Fricke, Robert W., Jr.

    1994-01-01

    The STS-61 Space Shuttle Program Mission Report summarizes the Hubble Space Telescope (HST) servicing mission as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the fifty-ninth flight of the Space Shuttle Program and fifth flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET designated as ET-60; three SSME's which were designated as serial numbers 2019, 2033, and 2017 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-063. The RSRM's that were installed in each SRB were designated as 360L023A (lightweight) for the left SRB, and 360L023B (lightweight) for the right SRB. This STS-61 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 8, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of the STS-61 mission was to perform the first on-orbit servicing of the Hubble Space Telescope. The servicing tasks included the installation of new solar arrays, replacement of the Wide Field/Planetary Camera I (WF/PC I) with WF/PC II, replacement of the High Speed Photometer (HSP) with the Corrective Optics Space Telescope Axial Replacement (COSTAR), replacement of rate sensing units (RSU's) and electronic control units (ECU's), installation of new magnetic sensing systems and fuse plugs, and the repair of the Goddard High Resolution Spectrometer (GHRS). Secondary objectives were to perform the requirements of the IMAX Cargo Bay Camera (ICBC), the IMAX Camera, and the Air Force Maui Optical Site (AMOS) Calibration Test.

  11. 20 CFR 416.969 - Listing of Medical-Vocational Guidelines in appendix 2 of subpart P of part 404 of this chapter.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... residual functional capacity is not the same as the corresponding criterion of a rule. In these instances... economy. Appendix 2 provides rules using this data reflecting major functional and vocational patterns. We...

  12. Defense Financial and Investment Review. Appendix 3. Financial Community Perceptions of the Defense Industry: 1985,

    DTIC Science & Technology

    1985-03-01

    customer. The interviewed executives believe these considerations are a major cause for the rather low esteem in which the investing public holds defense...RD-RI58 246 DEFENSE FINANCIAL AND INVESTMENT REVIEN APPENDIX 3 FINRNCIAL COMMUNITY PE.. (U) LOGISTICS MANAGEMENT INST BETHESDA MD P J DAVEY ET RL... INVESTMENT REVIEW, APPENDIX 3; Financial Community Perceptions Of The Defense Industry: 1985 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(e) 8. CONTRACT

  13. 38 CFR Appendix C to Part 200 - Actions Requiring Environmental Impact Statement

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Environmental Impact Statement C Appendix C to Part 200 Pensions, Bonuses, and Veterans' Relief ARMED FORCES...—Actions Requiring Environmental Impact Statement The following actions are considered to be major Federal actions significantly affecting the quality of the human environment, and therefore must be the subjects...

  14. 38 CFR Appendix C to Part 200 - Actions Requiring Environmental Impact Statement

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Environmental Impact Statement C Appendix C to Part 200 Pensions, Bonuses, and Veterans' Relief ARMED FORCES...—Actions Requiring Environmental Impact Statement The following actions are considered to be major Federal actions significantly affecting the quality of the human environment, and therefore must be the subjects...

  15. Effects of the Safe Drinking Water Act Amendments of 1986 on Army Fixed Installation Water Treatment Plants

    DTIC Science & Technology

    1992-06-01

    Parathion degradation product Chloramines Bromacil (4>-Nitrophenol) Chlorate Cyanazine Prometon Chlorine Cryomazine 2,4,5- T Chlorine Dioxide DCPA (and...value is the residual disinfectant concentration. T is the disinfectant contact time. Explanations of how C and T are calculated are included in Appendix...each chlorine residual disinfectant concentration sampling point. c) Disinfectant Contact Time. The disinfectant contact time ( T ) must be determined

  16. 7 CFR Appendix A to Subpart B of... - Technical Reports for Projects With Total Eligible Project Costs of $200,000 or Less

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of the wind turbine is 100kW or smaller and with a generator hub height of 120 feet or less. Small... demonstrate the amount of local wind resource where the small wind turbine is to be installed. Indicate the... of the individual wind turbine(s) is larger than 100kW. (a) Qualifications of key project service...

  17. 7 CFR Appendix A to Subpart B of... - Technical Reports for Projects With Total Eligible Project Costs of $200,000 or Less

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of the wind turbine is 100kW or smaller and with a generator hub height of 120 feet or less. Small... demonstrate the amount of local wind resource where the small wind turbine is to be installed. Indicate the... of the individual wind turbine(s) is larger than 100kW. (a) Qualifications of key project service...

  18. 7 CFR Appendix A to Subpart B of... - Technical Reports for Projects With Total Eligible Project Costs of $200,000 or Less

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... of the wind turbine is 100kW or smaller and with a generator hub height of 120 feet or less. Small... demonstrate the amount of local wind resource where the small wind turbine is to be installed. Indicate the... of the individual wind turbine(s) is larger than 100kW. (a) Qualifications of key project service...

  19. Critical Evaluation of State-of-the-Art In Situ Thermal Treatment Technologies for DNAPL Source Zone Treatment

    DTIC Science & Technology

    2010-01-01

    from steel pipe , copper plate for heating distinct zones and sheet pile. Sheet pile electrodes allow for quick installation with little to no drilling...as electrodes. Electrodes constructed using Thermal Remediation Services - Electrical Resistance Heating ER-0314 18 Appendix B steel pipe are...who authored state- of-the-art descriptions for the most common in-situ thermal technologies currently employed:  Electrical Resistance Heating

  20. 10 CFR Appendix I to Subpart B of... - Uniform Test Method for Measuring the Energy Consumption of Conventional Ranges, Conventional...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pressure of 30 inches of mercury (101.6 kPa) (density of mercury equals 13.595 grams per cubic centimeter...—Volume of Gas Consumed W—Weight of Test Block 2. Test Conditions 2.1Installation. A free standing kitchen.... 2.9.2Gas Measurements. 2.9.2.1Positive displacement meters. The gas meter to be used for measuring...

  1. SMM X-ray polychromator

    NASA Technical Reports Server (NTRS)

    Strong, Keith T.; Haisch, Bernhard M. (Compiler); Lemen, James R. (Compiler); Acton, L. W.; Bawa, H. S.; Claflin, E. S.; Freeland, S. L.; Slater, G. L.; Kemp, D. L.; Linford, G. A.

    1988-01-01

    The range of observing and analysis programs accomplished with the X-Ray Polychromator (XRP) instruments during the decline of solar cycle 21 and the rise of the solar cycle 22 is summarized. Section 2 describes XRP operations and current status. This is meant as a guide on how the instrument is used to obtain data and what its capabilities are for potential users. The science section contains a series of representative abstracts from recently published papers on major XRP science topics. It is not meant to be a complete list but illustrates the type of science that can come from the analysis of the XRP data. There then follows a series of appendixes that summarize the major data bases that are available. Appendix A is a complete bibliography of papers and presentations produced using XRP data. Appendix B lists all the spectroscopic data accumulated by the Flat Crystal Spectrometer (FCS). Appendix C is a compilation of the XRP flare catalogue for events equivalent to a GOES C-level flare or greater. It lists the start, peak and end times as well as the peak Ca XIX flux.

  2. SMM X-ray polychromator

    NASA Astrophysics Data System (ADS)

    Strong, Keith T.; Haisch, Bernhard M.; Lemen, James R.; Acton, L. W.; Bawa, H. S.; Claflin, E. S.; Freeland, S. L.; Slater, G. L.; Kemp, D. L.; Linford, G. A.

    1988-05-01

    The range of observing and analysis programs accomplished with the X-Ray Polychromator (XRP) instruments during the decline of solar cycle 21 and the rise of the solar cycle 22 is summarized. Section 2 describes XRP operations and current status. This is meant as a guide on how the instrument is used to obtain data and what its capabilities are for potential users. The science section contains a series of representative abstracts from recently published papers on major XRP science topics. It is not meant to be a complete list but illustrates the type of science that can come from the analysis of the XRP data. There then follows a series of appendixes that summarize the major data bases that are available. Appendix A is a complete bibliography of papers and presentations produced using XRP data. Appendix B lists all the spectroscopic data accumulated by the Flat Crystal Spectrometer (FCS). Appendix C is a compilation of the XRP flare catalogue for events equivalent to a GOES C-level flare or greater. It lists the start, peak and end times as well as the peak Ca XIX flux.

  3. Installation Restoration Program. Site Investigation Report. Revision 4. Volume 2: Appendix B through Appendix E. 155th Air Refueling Group, Nebraska Air National Guard, Lincoln Municipal Airport, Lincoln, Nebraska.

    DTIC Science & Technology

    1995-04-01

    1 50 I 15.0 - 40.09 of mass 95 1 20.5 1 75 1 30.0 - 60.0% of mass 95 1 41.5 95 1 Base peak , 100% relative abundance 1100.0 1 96 1 5.0 - 9.0% of mass...2.0% of mass 69 1 .0_( 1 127 1 40.0 - 60.0% of mass 198 141.7- I 197 1 Less than 1.0% of mass 198 1 .0 1 198 1 Base peak , i00% relative abundance...48.3 1 701 Less than 2.0% of mass 69 1 .0_(. .( I 127 1 40.0 - 60.0% of mass 198 1 40.2 I 197 1 Less than 1.00 of mass 198 1 .0 1 198 1 Base peak

  4. 20 CFR 404.1525 - Listing of Impairments in appendix 1.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Impairments (the listings) is in appendix 1 of this subpart. It describes for each of the major body systems... relationship with their counterparts in part A. (c) How do we use the listings? (1) Most body system sections.... (2) The introduction to each body system contains information relevant to the use of the listings in...

  5. 20 CFR 404.1525 - Listing of Impairments in appendix 1.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Impairments (the listings) is in appendix 1 of this subpart. It describes for each of the major body systems... relationship with their counterparts in part A. (c) How do we use the listings? (1) Most body system sections.... (2) The introduction to each body system contains information relevant to the use of the listings in...

  6. 20 CFR 404.1525 - Listing of Impairments in appendix 1.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Impairments (the listings) is in appendix 1 of this subpart. It describes for each of the major body systems... relationship with their counterparts in part A. (c) How do we use the listings? (1) Each body system section in... introduction to each body system contains information relevant to the use of the listings in that body system...

  7. 20 CFR 404.1525 - Listing of Impairments in appendix 1.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Impairments (the listings) is in appendix 1 of this subpart. It describes for each of the major body systems... relationship with their counterparts in part A. (c) How do we use the listings? (1) Most body system sections.... (2) The introduction to each body system contains information relevant to the use of the listings in...

  8. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial installation and after major maintenance. THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before...

  9. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial installation and after major maintenance. THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before...

  10. Installation Restoration Program Stage 2-1 Remedial Investigation. Beale Air Force Base, Marysville, California. Volume 3. Appendix B - K

    DTIC Science & Technology

    1991-03-29

    I0IYOiHPI1 ISenu n!W .46 ,.II I J LIo Yg I 0 lf I IJliGn I r IM,I I.E_ I IVAna di mjdIIi ~ LaIIII j~inc zo- 20 III IT _______ di ~ ’n F-256 / ____CHZN...VJ is the lijit of detecticq fcr ’thit cvicmud. ba~ ern 1flutic-1. irdicates in estisated trice a lh ANAL Y ST :________________ OrRF.OED BY

  11. Installation Restoration Program. Records Search, Newark AFS, Ohio

    DTIC Science & Technology

    1985-04-01

    APPENDIX J - Aerial Photograph Newark Air Force Station . . . J-i i I I 1 I ! I iv I LIST OF TABLES No. Page 1 Potential Risk Ranking Based on Final HARM...accuracies of standards used at base level are directly traceable to the 3 Air Force Measurement Standards Laboratory at AGMC. The primary standards from...Approximately eight years ago the Base Exchange released it to the motor pool. Service is provided for all Air Force vehicles and equipment on the

  12. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1 for Tinker AFB, Oklahoma. Volume 2. Appendices,

    DTIC Science & Technology

    1985-09-01

    Special Olt 9-; ~ ~ ~ ~ ~ J -..-- w--- ’- V - V --y a - . . . . . . RADIAN APPENDIX A Definitions, Nomenclatures and Units A- i . -- 5. . -, - - STAGED...contaminatg ed 11 a thei±r~ iMei S-t.r-roundlin. Review the u f -r Ai Force investigationa. These *r-esu I.ts shall~ I & prvie une eatcvr B-5 -9 V q M I ...results or highly complicated nonlinear mathematical modeling , should * be precise, clear and technically defendable. This section should clearly

  13. Flexible Case - Grain Interaction in Ballistic Weapon Systems. Volume I. Technical Accomplishments.

    DTIC Science & Technology

    1976-10-01

    Summary of Test Measurements for Motor No. 2 K-i Appendix I Software Documentation and User ’s Manual L-1 Multiplexor Driver Program for the F Varian...the - .4 case. Thus, any force applied to the steel pl ug causes a slight deflectionof the strain gaged element that can be interpreted as a stress...were extruded by manual pressure.The failure gages were installed in a similar manner with the exception that they were bonded in place with standard AGC

  14. Space shuttle/food system study. Volume 2, appendix E: Alternate flight systems analysis

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The functional requirements of stowage, preparation, serving, consumption, and cleanup were applied to each of the five food mixes selected for study in terms of the overall design of the space shuttle food system. The analysis led to a definition of performance requirements for each food mix, along with a definition of equipment to meet those requirements. Weight and volume data for all five systems, in terms of food and packaging, support equipment, and galley installation penalties, are presented.

  15. Installation Restoration Program (IRP) Stage 3. McClellan Air Force Base. Operable Unit B. Preliminary Assessment Summary Report. Volume 2. Appendix B (Part 2)

    DTIC Science & Technology

    1991-10-01

    the Industrial Wastewater Collection System (IWCS) for leaks and analyzed wastewater passing through the wastewater lines (the IWL) at McClellan AFB (EG...Wastewater Collection System (IWCS) is a system of underground pipes and lift stations used to collect the wastewater from the various base processes...and work areas for treatment at one centralized Industrial Wastewater Treatment Plant (IWTP) located in OU C McClellan AFB. Most of the system is

  16. VHF (Very High Frequency)-AM Communications Equipment Selection and Installation Practices for Helicopters.

    DTIC Science & Technology

    1985-09-01

    available for VHF ground stations. It examines In detail the options available in the avionics market place, and the problems associated with comparing...Appendix A presents the results of a survey of manufacturer’s specifications for 49 different models of airborne VHF communicatons avionics. A review...aimed primarily at the ’rbine aircraft market ). They are much stronger than "cat’s whisker" types and are capable of withstanding the drag and g

  17. Feasibility study for the construction of a new LNG receiving terminal, turkey. Volume 2. Appendix. Export trade information. [LNG (liquified natural gas)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-06-01

    The report was prepared by The M. W. Kellogg Co. for BOTAS Petroleum Pipeline Corporation of Ankara, Turkey. The study was undertaken to evaluate the cost and economics of constructing a second liquified natural gas (LNG) terminal in Turkey to meet future requirements for natural gas. Volume 2 contains the following appendices: LNG Storage Tanks; Vaporizers; Compressors; Pumps; Loading Arms; Marine Installations; Shipping; and Seismic Study.

  18. An Annotated Bibliography of Patents Related to Coastal Engineering. Volume III. 1974-1976. Appendix.

    DTIC Science & Technology

    1979-11-01

    infrared detectors produce signals which are proportional to the detected reflected radia- tion at the wavelengths k, and A,. A processing channel is con...instrument including an oscillator for sup- T___ plying AC energy to a transducer. The oscillator is keyed on /I by a multvibrator which produces clock pulses... includes dams including such units when installed, and methods of damming water flow. o- 3.786.640 .MEANS AND METHOD FOR PRODUCING STEPPED CONCRETE SLOPE

  19. STS-57 Space Shuttle mission report

    NASA Technical Reports Server (NTRS)

    Fricke, Robert W., Jr.

    1993-01-01

    The STS-57 Space Shuttle Program Mission Report provides a summary of the Payloads, as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the fifty-sixth flight of the Space Shuttle Program and fourth flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET (ET-58); three SSME's which were designated as serial numbers 2019, 2034, and 2017 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-059. The lightweight RSRM's that were installed in each SRB were designated as 360L032A for the left SRB and 360W032B for the right SRB. The STS-57 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement, as documented in NSTS 07700, Volume 8, Appendix E. That document states that each major organizational element supporting the Program will report the results of their hardware evaluation and mission performance plus identify all related in-flight anomalies.

  20. 32 CFR Appendix A to Part 623 - Explanation of Terms

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., or other political subdivision of any State. Major disaster. Any hurricane, tornado, storm, flood.... Threatened major disaster. Any hurricane, tornado, storm, flood, high water, wind-driven water, tidal wave...

  1. 32 CFR Appendix A to Part 623 - Explanation of Terms

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., or other political subdivision of any State. Major disaster. Any hurricane, tornado, storm, flood.... Threatened major disaster. Any hurricane, tornado, storm, flood, high water, wind-driven water, tidal wave...

  2. 32 CFR Appendix A to Part 623 - Explanation of Terms

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., or other political subdivision of any State. Major disaster. Any hurricane, tornado, storm, flood.... Threatened major disaster. Any hurricane, tornado, storm, flood, high water, wind-driven water, tidal wave...

  3. 32 CFR Appendix A to Part 623 - Explanation of Terms

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., or other political subdivision of any State. Major disaster. Any hurricane, tornado, storm, flood.... Threatened major disaster. Any hurricane, tornado, storm, flood, high water, wind-driven water, tidal wave...

  4. 32 CFR Appendix A to Part 623 - Explanation of Terms

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., or other political subdivision of any State. Major disaster. Any hurricane, tornado, storm, flood.... Threatened major disaster. Any hurricane, tornado, storm, flood, high water, wind-driven water, tidal wave...

  5. 32 CFR Appendix A to Part 651 - References

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Technology). DOD 5000.2-R Mandatory Procedures for Major Defense Acquisition Programs and Major Automated... Protection of Children from Environmental Health Risks and Safety Risks, 3 CFR, 1997 Comp., p. 198. Executive...

  6. 32 CFR Appendix A to Part 651 - References

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Technology). DOD 5000.2-R Mandatory Procedures for Major Defense Acquisition Programs and Major Automated... Protection of Children from Environmental Health Risks and Safety Risks, 3 CFR, 1997 Comp., p. 198. Executive...

  7. (Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30more » percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.« less

  8. Miscellaneous chemical basin expedited site characterization report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Riha, B.D.; Pemberton, B.E.; Rossabi, J.

    1996-12-01

    A total of twenty nine cone penetrometer test (CPT) pushes in three weeks were conducted for vadose zone characterization of the Miscellaneous Chemical Basin (MCB) waste unit at the Savannah River Site. The shallow, unlined basin received liquid chemical wastes over an 18 year period beginning in 1956. This characterization was initiated to determine the vertical and lateral extent of contamination in the vadose zone and to install vadose zone wells for remediation by barometric pumping or active vapor extraction to help prevent further contamination of groundwater. The CPT locations within the waste site were selected based on results frommore » previous shallow soil gas surveys, groundwater contamination data, and the suspected basin center. Geophysical data and soil gas samples were collected at twenty five locations and twenty five vadose zone wells were installed. The wells were screened to target the clay zones and areas of higher soil gas concentrations. The well construction diagrams are provided in Appendix B. Baro-Ball{trademark} valves for enhanced barometric pumping were installed on each well upon completion to immediately begin the remediation treatability study at the site.« less

  9. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Columbia River System Operation Review

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  10. 20 CFR 416.925 - Listing of Impairments in appendix 1 of subpart P of part 404 of this chapter.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the major body systems impairments that we consider to be severe enough to prevent an individual from... use the listings? (1) Most body system sections in parts A and B of appendix 1 are in two parts: an introduction, followed by the specific listings. (2) The introduction to each body system contains information...

  11. 20 CFR 416.925 - Listing of Impairments in appendix 1 of subpart P of part 404 of this chapter.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the major body systems impairments that we consider to be severe enough to prevent an individual from... use the listings? (1) Most body system sections in parts A and B of appendix 1 are in two parts: an introduction, followed by the specific listings. (2) The introduction to each body system contains information...

  12. Readability and the Production of Instructional Text in the Royal Navy,

    DTIC Science & Technology

    1980-11-01

    Conclusions 28 References 35 Appendix A Royal Naval Educational and Training Establishrents Surveyed during the Project. Appendix B Readability and the...systematic assessment has been recognised for sone time. Educators understandably showed an interest in readability. Klare [351 reported cases of...covered, the purposes of the study were explained and discussed. 2. Subjects: Contact was made with all the major educational and training establishments

  13. A Comparative Study of GDSS (Group Decision Support System) Use: Empirical Evidence and Model Design

    DTIC Science & Technology

    1987-09-01

    G D SS ............................................... 67 APPENDIX A: ENERGY INTERNATIONAL CASE ...................... 69 APPENDIX B: QUESTIONNAIRE...the impact of many of the disadvantages. C. DESIRABLE CHARACTERISTICS OF A GDSS The designer of a GDSS must consider the major functional requirements...592]. Alter has stated that interaction with the GDSS is not the most important aspect of the system. Instead, designers should direct their energies

  14. Star-Hopping

    NASA Astrophysics Data System (ADS)

    Garfinkle, Robert A.

    1997-07-01

    Introduction; Preface; Acknowledgements; 1. How to use this book and what you are going to see; 2. How the sky works, determining your field of view, observing tips and how to navigate in the night sky; 3. January - Taurus and Orion: the bull and hunter; 4. February - Canis Minor, Canis Major, and Puppis: dog days in February and Jason's Argo; 5. March - Cancer, Leo, and Corvus: a crab, the king of the beasts, and a crow; 6. April - Ursa Major: a dipper round tripper; 7. May - Coma Berenices and Virgo: the sparkling hair of Berenice and the wheat maiden and her bushel of galaxies; 8. June - Libra and Lupus: the balance scales and the wolf; 9. July - Scorpius, Sagittarius, and Scutum: the scorpion, archer, and shield of John Sobieski; 10. August - Draco: following the trail of the dragon; 11. September - Cygnus, Lyra, Vulpecula, and Sagitta: the swan, lyre, fox, and arrow; 12. October - Andromeda and Perseus: the chained lady and her rescuer; 13. November - Cepheus and Cassiopeia: the king and queen of Joppa; 14. December - Pisces, Triangulum, and Aries: of fishes, a triangle, and a ram; 15. Messier Marathon, a sundown to sunup hop across the skies; Appendix A: Classification tables; Appendix B: The constellations; Appendix C: The Greek alphabet; Appendix D: Decimalization of the day; Glossary; Bibliography; Index.

  15. U.S. Air Force Installation Restoration Program. Phase 1. Records Search for Suffolk County Air Force Base (Retired) Landfills 1 and 2. Suffolk County Airport, Westhampton Beach, New York.

    DTIC Science & Technology

    1987-09-20

    of the two study sites (Appendix D). Common species include the herring and ring-billed gull, mourning dove, tree swallow, chimney swift, purple... Species ................... 111-30 III.G ADJACENT LAND USE .................................... 111-31 III.H SUMMARY OF ENVIRONMENTAL FEATURES...methodology, and a list of acronyms/abbreviations used in this report. 1-4 W- x--WW- -- vqwu UV X DECISION TREE Complete List of Locations/Sites I Evaluation

  16. Operation REDWING, Report of the Manager Albuquerque Operations

    DTIC Science & Technology

    1983-01-31

    on their experience in three previous operations (IVY, GREENHOUSE , and CASTLE) AEC authorized, and Holmes & Narver pur chased and shipped to the...Operation GREENHOUSE and one 51-pair cable installed prior to REDWING. One of the 16-pair cables developed shorted and opened pairs. When an...refrigerators, dehumidification units, 20’ ■.r.. i..jjj||.t.^. .M , ., ». i .. —■■■"■= •>•■•— :- •’ ■’ ■■-■■ ■- ’■ • APPENDIX lII-3.10-l

  17. Secondary & College Biology Students' Misconceptions About Diffusion & Osmosis.

    ERIC Educational Resources Information Center

    Odom, Arthur Louis

    1995-01-01

    Tests on diffusion and osmosis given to (n=116) secondary biology students, (n=123) nonbiology majors, and (n=117) biology majors found that, even after instruction, students continue to have misconceptions about these ideas. Appendix includes diffusion and osmosis test. (MKR)

  18. Air Force Contract Negotiations: Importance, Roles, and Major Problems in the United States and Four NATO Countries

    DTIC Science & Technology

    1982-06-01

    Negotiations in General 72 Negotiations with Europeans 72 APPENDICES A. Information on Survey Populations and Respondents 73 B . Survey Questionnaire...included in the survey. A copy of the questionnaire is continued in Appendix B . Subsequently, the support of the four product divisions was requested...uncertainty concerning the number of personnel who would respond to the request for participation in the survey. APPENDIX B AIR FORCE CONTRACT

  19. Stormwater Pollution Prevention Plan (SWPPP) for Coal Storage Area Stabilization Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Project and Design Engineering

    2011-03-01

    The scope of this project is to stabilize the abandoned coal storage area and redirect the storm water runoff from sanitary sewer system to the storm drain system. Currently, the existing storm water runoff is directed to a perimeter concrete drainage swale and collected in a containment basin. The collected water is then pumped to a treatment facility and after treatment, is discharged to the Y-12 sanitary sewer system. The existing drainage swale and collection basin along with silt fencing will be used during aggregate placement and grading to provide erosion and sediment control. Inlet protection will also be installedmore » around existing structures during the storm water diversion construction. This project scope will include the installation of a non-woven geotextile fabric and compacted mineral aggregate base (paving optional) to stabilize the site. The geotextile specifications are provided on the vendor cut sheets in Appendix B. The installation of a storm water collection/retention area will also be installed on the southern side of the site in accordance with EPA Technical Guidance on Implementing the Stormwater Runoff Requirements for federal Projects under Section 438 of the Energy Independence and Security Act. The total area to be disturbed is approximately 2.5 acres. The order of activities for this Stormwater Pollution Prevention Plan (SWPPP) will be: (1) post notice of coverage (NOC) in a prominent display near entrance of the site; (2) install rain gauge on site or contact Y-12 Plant Shift Superintendent daily for Met tower rain gauge readings; (3) install stabilized construction exit on site; (4) install silt fencing along perimeter as indicated on the attached site plan; (5) regrade site; (6) install geotextile fabric and compacted mineral aggregate base; (7) install catch basin inlet protection where required; (8) excavate and lower existing catch basin tops, re-grade and asphalt to drain; and (9) when all disturbed areas are re-stabilized, remove silt fencing and any other temporary erosion control.« less

  20. 2 CFR Appendix E to Part 225 - State and Local Indirect Cost Rate Proposals

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... 1. General. a. Where a governmental unit's department or agency has only one major function, or where all its major functions benefit from the indirect costs to approximately the same degree, the...'s department or agency has several major functions which benefit from its indirect costs in varying...

  1. 2 CFR Appendix E to Part 225 - State and Local Indirect Cost Rate Proposals

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... 1. General. a. Where a governmental unit's department or agency has only one major function, or where all its major functions benefit from the indirect costs to approximately the same degree, the...'s department or agency has several major functions which benefit from its indirect costs in varying...

  2. Flat-plate solar collector - installation package

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  3. [Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 9, Removal action system design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30more » percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.« less

  4. A Comparison of Aircraft Maintenance Organizational Structures

    DTIC Science & Technology

    1992-09-01

    Outputs ... ...................... 85 Appendix E : Double Cross-Validation ........... 117 Appendix F: Exchange of Independent Variables...splits into three major production branches (6). See Figure 8. 26 Aircraf t Interm ia•’ e Maintenance Off icerzI A ssistantAIKO I 1|A/ant a A Traiing...responsible for all aircraft maintenance activities, see Figure 9 (4:3). rdor ! E •; e Techn•1i Se~rvices Wff oE r I f .1 Bass Airaraf t Iaintenanoc E

  5. Marine biology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thurman, H.V.; Webber, H.H.

    1984-01-01

    This book discusses both taxonomic and ecological topics on marine biology. Full coverage of marine organisms of all five kingdoms is provided, along with interesting and thorough discussion of all major marine habitats. Organization into six major parts allows flexibility. It also provides insight into important topics such as disposal of nuclear waste at sea, the idea that life began on the ocean floor, and how whales, krill, and people interact. A full-color photo chapter reviews questions, and exercises. The contents are: an overview marine biology: fundamental concepts/investigating life in the ocean; the physical ocean, the ocean floor, the naturemore » of water, the nature and motion of ocean water; general ecology, conditions for life in the sea, biological productivity and energy transfer; marine organisms; monera, protista, mycota and metaphyta; the smaller marine animals, the large animals marine habitats, the intertidal zone/benthos of the continental shelf, the photic zone, the deep ocean, the ocean under stress, marine pollution, appendix a: the metric system and conversion factors/ appendix b: prefixes and suffixes/ appendix c: taxonomic classification of common marine organisms, and glossary, and index.« less

  6. Information Exchange Procedures for Major Research Universities; Technical Diary of the Major Research Universities' Pilot Test.

    ERIC Educational Resources Information Center

    Topping, Jim

    The applicability and validity of NCHEMS' Information Exchange Procedures (IEP) to major research universities are examined. IEP enables peer institutions to compare information about their resources. Evaluation of the IEP costing methods are examined in this document, which is intended as an appendix to "Evaluation of the IEP Costing…

  7. An Examination of Protocols for The Collection of Munitions-Derived Explosives Residues on Snow-Covered Ice

    DTIC Science & Technology

    2005-04-01

    with a single demolition block charge of C4 (DODIC M023) as the donor charge. An M739 point- detonating fuze (DODIC N340) was installed in each round...All rounds contained a supplementary TNT charge in the fuze well below the M739 fuze (see Appendix A). Figure 3 shows the setup common for all the...Charge, demolition block, Comp C4, M112 MA-97A003-007A 16 1390010809447 N340 Fuze, point detonating, M739 MA-84B007-013 7 Notes: Drawn from Fort

  8. Appendix 2. Guide for Running AgMIP Climate Scenario Generation Tools with R in Windows, Version 2.3

    NASA Technical Reports Server (NTRS)

    Hudson, Nicholas; Ruane, Alexander Clark

    2013-01-01

    This Guide explains how to create climate series and climate change scenarios by using the AgMip Climate team's methodology as outlined in the AgMIP Guide for Regional Assessment: Handbook of Methods and Procedures. It details how to: install R and the required packages to run the AgMIP Climate Scenario Generation scripts, and create climate scenarios from CMIP5 GCMs using a 30-year baseline daily weather dataset. The Guide also outlines a workflow that can be modified for application to your own climate data.

  9. De Novo Chromosome Copy Number Variation in Fanconi Anemia-Associated Hematopoietic Defects

    DTIC Science & Technology

    2012-04-01

    Appendix 1. Expansion of monoclonal populations of FA-A hTERT and FA-A + FANCA hTERT cells Appendix 2. Expansion of monoclonal populations of FA...marrow failure (BMF) and pronounced cancer susceptibility. The FA proteins and the major breast cancer susceptibility gene products BRCA1 and BRCA2...Correction of FA-A, FA-C, and FA-D2 hTERT cells with pLenti6.2/V5- FANCA , -FANCC, and FANCD2, respectively. Sub-task 1. Selection and expansion of clonal

  10. NASA's Microgravity Technology Report, 1996: Summary of Activities

    NASA Technical Reports Server (NTRS)

    Kierk, Isabella

    1996-01-01

    This report covers technology development and technology transfer activities within the Microgravity Science Research Programs during FY 1996. It also describes the recent major tasks under the Advanced Technology Development (ATD) Program and identifies current technology requirements. This document is consistent with NASA,s Enteprise for the Human Exploration and development of Space (HEDS) Strategic Plan. This annual update reflects changes in the Microgravity Science Research Program's new technology activities and requirements. Appendix A. FY 1996 Advanced Technology Development. Program and Project Descriptions. Appendix B. Technology Development.

  11. Project CHECO Southeast Asia Report. Rolling Thunder, January 1967 - November 1968

    DTIC Science & Technology

    1969-10-01

    APPENDIX 5, Neut (alized o( Abandoned A list of inactive targets previously li,ted prima(ily in APPENDiX 4 that had been neutralized I- or abandoned and...struck was Van Dien Battery Plant for which no BDA was avail- able. " TRANSPORTATION, A major interdiction effort continued against the key lines of...the Laos Bor- der . Bridges that have not been used regularly s?,nce the bombing started are up and in use on LOCs leading to the DMZ. In short, the

  12. Solar Energy Installers Curriculum Guide. Final Report, September 18, 1980-August 15, 1981.

    ERIC Educational Resources Information Center

    Seaman, George B., Sr.

    This publication is a curriculum guide for the installation of solar equipment. It is divided into the three major areas of general knowledge, technical design, and installation/maintenance. Associated is a list of relevant and prerequisite competencies identified as appropriate toward student interest groups of technician, installer,…

  13. The History of World Cinema.

    ERIC Educational Resources Information Center

    Robinson, David

    This survey of the history of world cinema begins with the "Pre-history" of film making and covers developments, by major periods, through 1972. The film making of all major countries, except Australia, receives attention, and the appendixes contain a note on animated films, a selected filmographies list, and a bibliography. Aspects of…

  14. 2 CFR Appendix A to Part 230 - General Principles

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... accordance with the relative benefits received. A cost is allocable to a Federal award if it is treated... personnel, occupy space, and benefit from the organization's indirect costs. 4. The costs of activities... major function, or where all its major functions benefit from its indirect costs to approximately the...

  15. 14 CFR Appendix B to Part 43 - Recording of Major Repairs and Major Alterations

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., within 48 hours after the aircraft, airframe, aircraft engine, propeller, or appliance is approved for... approval for return to service of the aircraft, airframe, aircraft engine, propeller, or appliance; (3... engine, propeller or appliance. (ii) If an aircraft, the make, model, serial number, nationality and...

  16. 14 CFR Appendix B to Part 43 - Recording of Major Repairs and Major Alterations

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., within 48 hours after the aircraft, airframe, aircraft engine, propeller, or appliance is approved for... approval for return to service of the aircraft, airframe, aircraft engine, propeller, or appliance; (3... engine, propeller or appliance. (ii) If an aircraft, the make, model, serial number, nationality and...

  17. 14 CFR Appendix B to Part 43 - Recording of Major Repairs and Major Alterations

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., within 48 hours after the aircraft, airframe, aircraft engine, propeller, or appliance is approved for... approval for return to service of the aircraft, airframe, aircraft engine, propeller, or appliance; (3... engine, propeller or appliance. (ii) If an aircraft, the make, model, serial number, nationality and...

  18. 14 CFR Appendix B to Part 43 - Recording of Major Repairs and Major Alterations

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., within 48 hours after the aircraft, airframe, aircraft engine, propeller, or appliance is approved for... approval for return to service of the aircraft, airframe, aircraft engine, propeller, or appliance; (3... engine, propeller or appliance. (ii) If an aircraft, the make, model, serial number, nationality and...

  19. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: FID calibrationTHC FID optimization, and THC FID verification Calibrate all FID analyzers: upon initial installation and after major maintenance.Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon...

  20. 40 CFR 1065.303 - Summary of required calibration and verifications

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: Upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers.... For THC FID analyzers: Upon initial installation, after major maintenance, and after FID optimization...

  1. 40 CFR 1065.303 - Summary of required calibration and verifications

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: Upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers.... For THC FID analyzers: Upon initial installation, after major maintenance, and after FID optimization...

  2. Engine Installation Effects of Four Civil Transport Airplanes: Wallops Flight Facility Study

    NASA Technical Reports Server (NTRS)

    Fleming, Gregg G.; Senzig, David A.; McCurdy, David A.; Roof, Christopher J.; Rapoza, Amanda S.

    2003-01-01

    The National Aeronautics and Space Administration (NASA), Langley Research Center (LaRC), the Environmental Measurement and Modeling Division of the United States Department of Transportation s John A. Volpe National Transportation Systems Center (Volpe), and several other organizations (see Appendix A for a complete list of participating organizations and individuals) conducted a noise measurement study at NASA s Wallops Flight Facility (Wallops) near Chincoteague, Virginia during September 2000. This test was intended to determine engine installation effects on four civil transport airplanes: a Boeing 767-400, a McDonnell-Douglas DC9, a Dassault Falcon 2000, and a Beechcraft King Air. Wallops was chosen for this study because of the relatively low ambient noise of the site and the degree of control over airplane operating procedures enabled by operating over a runway closed to other uses during the test period. Measurements were conducted using a twenty microphone U-shaped array oriented perpendicular to the flight path; microphones were mounted such that ground effects were minimized and low elevation angles were observed.

  3. 'Worst case' methodology for the initial assessment of societal risk from proposed major accident installations.

    PubMed

    Carter, D A; Hirst, I L

    2000-01-07

    This paper considers the application of one of the weighted risk indicators used by the Major Hazards Assessment Unit (MHAU) of the Health and Safety Executive (HSE) in formulating advice to local planning authorities on the siting of new major accident hazard installations. In such cases the primary consideration is to ensure that the proposed installation would not be incompatible with existing developments in the vicinity, as identified by the categorisation of the existing developments and the estimation of individual risk values at those developments. In addition a simple methodology, described here, based on MHAU's "Risk Integral" and a single "worst case" even analysis, is used to enable the societal risk aspects of the hazardous installation to be considered at an early stage of the proposal, and to determine the degree of analysis that will be necessary to enable HSE to give appropriate advice.

  4. Information Resources Management Long Range Plan, FY 1995-1999

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.

  5. 32 CFR Appendix F to Part 651 - Glossary

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Training Area Management. LCED Life Cycle Environmental Documentation. MACOM Major Army Command. MATDEV... Record of Non-Applicability. RSC Regional Support Command. S&T Science and Technology. SA Secretary of...

  6. Criterion-Referenced Item Banking in Electronics: Appendix G. Final Report.

    ERIC Educational Resources Information Center

    Gorth, William Phillip; Swaminathan, Hariharan

    This is one of the outcomes of the work of the Massachusetts Evaluation Service Center for Occupational Education (ESCOE). After an overview of the Performance Test Development Project, a summary of the major products and byproducts is presented. The major products are: (1) a set of clearly defined, well-structured, and consistent behavioral…

  7. 14 CFR Appendix A to Part 43 - Major Alterations, Major Repairs, and Preventive Maintenance

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... alterations: (i) Changes in blade design. (ii) Changes in hub design. (iii) Changes in the governor or control... alterations: (i) Wings. (ii) Tail surfaces. (iii) Fuselage. (iv) Engine mounts. (v) Control system. (vi... the basic design of the fuel, oil, cooling, heating, cabin pressurization, electrical, hydraulic, de...

  8. 14 CFR Appendix A to Part 43 - Major Alterations, Major Repairs, and Preventive Maintenance

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... alterations: (i) Changes in blade design. (ii) Changes in hub design. (iii) Changes in the governor or control... alterations: (i) Wings. (ii) Tail surfaces. (iii) Fuselage. (iv) Engine mounts. (v) Control system. (vi... the basic design of the fuel, oil, cooling, heating, cabin pressurization, electrical, hydraulic, de...

  9. 14 CFR Appendix A to Part 43 - Major Alterations, Major Repairs, and Preventive Maintenance

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... alterations: (i) Changes in blade design. (ii) Changes in hub design. (iii) Changes in the governor or control... alterations: (i) Wings. (ii) Tail surfaces. (iii) Fuselage. (iv) Engine mounts. (v) Control system. (vi... the basic design of the fuel, oil, cooling, heating, cabin pressurization, electrical, hydraulic, de...

  10. 14 CFR Appendix A to Part 43 - Major Alterations, Major Repairs, and Preventive Maintenance

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... alterations: (i) Changes in blade design. (ii) Changes in hub design. (iii) Changes in the governor or control... alterations: (i) Wings. (ii) Tail surfaces. (iii) Fuselage. (iv) Engine mounts. (v) Control system. (vi... the basic design of the fuel, oil, cooling, heating, cabin pressurization, electrical, hydraulic, de...

  11. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Columbia River System Operation Review

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

  12. The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OShaughnessy, Eric J.

    This study uses data on over 900,000 solar PV installations to summarize the evolving market structure of the U.S. residential solar PV installation industry. Over 8,000 companies have installed residential PV systems in the United States. The vast majority of these installers are small local companies. At the same time, a subset of national-scale high-volume PV installation companies hold high market shares. This study examines the factors behind these trends in market concentration, including the role of customer financing options.

  13. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1 for Mather AFB, Sacramento, California. Volume 2. Appendices.

    DTIC Science & Technology

    1986-06-01

    SAC Strategic Air Command sedimentary Describes rocks resulting from aepo- sition of transported material that has accumulated in layers semi-confined...provided in a separately bound appendix to the draft final report. L. Meetings The contractor’s project leader shall attend two meetings, to be he_...I ’~’UO’’ I. - P P I--D Q P22PPP~b ~QPZ _’P- bPP ?Pf tnN -7-p (1)N Ir-J -1 0 (D u-iU v u AD-A184 581 INSI~A LLATION HISTORATI ON PRO ~AM PHASE 2 7CON

  14. High Reynolds Number Wave Force Investigation in a Wave Flume.

    DTIC Science & Technology

    1985-03-01

    RESULTS 43 6.0 CONCLUSIONS 45 7.0 REFERENCES 49 8.0 ACKNOWLEDGEMENTS 51 9.0 TABLES 53 10.0 FIGURES 93 11.0 APPENDIX A" 11.1 Druck Pressure Transducer...adjoining test cylinder by 0.7 mm, which had a negligible influence on the resulting measurements. After the Druck pressure transducers were installed and...dC C 3d 4 ;88dC 38dC CI8 cninfl"nV0to .t" o ,t in cv d-. ,0 en w . nC M..r nin - -0 - I!- I!- V! - -i !V L4JN C; .0 d C0000000 40000008 o .6 C

  15. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Air Force Plant 4, Fort Worth, Texas. Volume 5. Appendix A-2.

    DTIC Science & Technology

    1987-12-01

    Limit Spiked Samale Samole ISailced C" auod R sIus’lt (SSR) esult. (SR) A-dded ( .SA) Iels: I. I 1. A.luminum 75-125 - I Z. Antimony - 3. Arsenic " I...UntKtarix *s %Control Limit Spiked Samale Sample SieiCm.,ound _ _R R esult (SSR) Re t,.- (SR) Added (SA) Z,10 1. AUlunu m 7 I I I 2. Antimonyj ____ 3...No. DATE Lab Sample) ;S4 No Katrix waot, " . n ...Central L imi Spiked Samale Samale Spiked Comnpound M Rsult: (SSR) Result (SR) jAdded (SA) XR

  16. HALOE test and evaluation software

    NASA Technical Reports Server (NTRS)

    Edmonds, W.; Natarajan, S.

    1987-01-01

    Computer programming, system development and analysis efforts during this contract were carried out in support of the Halogen Occultation Experiment (HALOE) at NASA/Langley. Support in the major areas of data acquisition and monitoring, data reduction and system development are described along with a brief explanation of the HALOE project. Documented listings of major software are located in the appendix.

  17. Feasibility study on the modernization and expansion of the Tema Oil Refinery: Appendix 1, Part A. REFOP reports. Export trade information (Draft)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    The Tema Oil Refinery, which was commissioned in 1963, is a simple hydroskimming plant which processes crude oil into LPG, gasoline, kerosene, gasoil, and fuel oil. It is the only petroleum refinery in Ghana. Over the years, some of the equipment in the refinery has deteriorated or become obsolete, necessitating major rehabilitation. A feasibility study is investigating the modernization and expansion of the refinery to meet projected market demands until the year 2005. This report is appendix I, part A to the feasibility study.

  18. Feasibility study on the modernization and expansion of the Tema Oil Refinery: Appendix 1, Part B. REFOP reports (Final report). Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    The Tema Oil Refinery, which was commissioned in 1963, is a simple hydroskimming plant which processes crude oil into LPG, gasoline, kerosene, gasoil, and fuel oil. It is the only petroleum refinery in Ghana. Over the years, some of the equipment in the refinery has deteriorated or become obsolete, necessitating major rehabilitation. A feasibility study is investigating the modernization and expansion of the refinery to meet projected market demands until the year 2005. This report is appendix I, part B to the feasibility study.

  19. Technical Evaluation Report on the Fluid Dynamics Panel Symposium on Validation of Computational Fluid Dynamics

    DTIC Science & Technology

    1989-05-01

    separately each of the papers presented and makes general comments on the seven major topic sessions. In addition, a Poster Presentation was reviewed in...Appendix to this report. The Poster Papers, also listed in an Appendix, are published in CP437 Volume I. Le pr6sent rapport fait le point et donne une...ConfErence AGARD CP 437 Volume I dont une liste en est donn6e h I’annexe au pr6sent rapport. Une liste des r6unions d’information/exposition est

  20. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... interconnections must be provided to prevent differences of potential between major components of the installation and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect the...

  1. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... interconnections must be provided to prevent differences of potential between major components of the installation and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect the...

  2. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... interconnections must be provided to prevent differences of potential between major components of the installation and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect the...

  3. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... interconnections must be provided to prevent differences of potential between major components of the installation and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect the...

  4. Expedient Emergency Sanitation Measures

    DTIC Science & Technology

    1989-03-01

    maintaining or restoring adequate sanitation in a widespread emergency. In the event of a major earthquake or nuclear attack, sewage collection and...sanitation in a widespread emergency. In the event of a major earthquake or nuclear attack, sewage collection and treatment systems, electric power and...Handbook of Chlorination, Von Nostrand Reinhold, New York, 1972, and Appendix C. 12 chlorine disinfection. The cysts of the protozoa Entamoeba

  5. A preliminary design and analysis of an advanced heat-rejection system for an extreme altitude advanced variable cycle diesel engine installed in a high-altitude advanced research platform

    NASA Technical Reports Server (NTRS)

    Johnston, Richard P.

    1992-01-01

    Satellite surveillance in such areas as the Antarctic indicates that from time to time concentration of ozone grows and shrinks. An effort to obtain useful atmospheric data for determining the causes of ozone depletion would require a flight capable of reaching altitudes of at least 100,000 ft and flying subsonically during the sampling portion of the mission. A study of a heat rejection system for an advanced variable cycle diesel (AVCD) engine was conducted. The engine was installed in an extreme altitude, high altitude advanced research platform. Results indicate that the waste heat from an AVCD engine propulsion system can be rejected at the maximum cruise altitude of 120,000 ft. Fifteen performance points, reflecting the behavior of the engine as the vehicle proceeded through the mission, were used to characterize the heat exchanger operation. That portion of the study is described in a appendix titled, 'A Detailed Study of the Heat Rejection System for an Extreme Altitude Atmospheric Sampling Aircraft,' by a consultant, Mr. James Bourne, Lytron, Incorporated.

  6. Infrared Thermography As Quality Control For Foamed In-Place Insulation

    NASA Astrophysics Data System (ADS)

    Schwartz, Joel A.

    1989-03-01

    Since November of 1985, FOAM-TECH, INC. has been utilizing an I.S.I. Model 91 Videotherm Camera to quality control the installation of foamed in-place polyurethane and polyisocyanurate insulation. Monitoring the injection of foam into the walls and roofs of new construction and during the the retrofitting of older buildings has become an integral and routine step in daily operations. The Videotherm is also used to monitor the injection of foam into hot water tanks, trailer bodies for refrigeration trucks, and pontoons and buoys for flotation. The camera is also used for the detection of heat loss and air infiltration for conventionally insulated buildings. Appendix A are thermograms of foamed in-place insulation.

  7. Development of an Automated Micro-Computer Knowledge-Based Integrated Configuration Management System for the Stock Point Logistics Integrated Communications Environment (SPLICE) Project Management Staff.

    DTIC Science & Technology

    1986-03-01

    Installation Cost Real Basic Monthly Maintenance Cost Real -" . I 2 ! UU LU uj ~~ LA . ~z LU J LLU 151 APPENDIX B: MAINTENANCE MANUAL Page 15 -LJ uLA- u’Il -LJ...bl 59748.0 9 09 NARDAC JACKSONVILLE, FL, 2 2 VIII A S 188471.0 10 10 NARDAC NEW ORLEANS, LA 2 2 P A S 73918.0 11 11 NARDAC NORFOLK, VA 2 2 VIII A S...1366 Beqin 1367 FOR Row =0 to 5 LWJ 1368 FOR Col 1 to 3 DO 1369 Beqin 1370 Subtotals [Row, Coll := 0; 1371 IF Col ( 3 TIEN Totals

  8. The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OShaughnessy, Eric J

    Market structure refers to the number of firms and the distribution of market shares among firms within an industry. In The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016, we examine market structure in the context of residential solar PV. We find that over 8,000 companies have installed at least one residential PV system, with about 2,900 companies active in 2016. The majority of residential PV installers are relatively small companies, with about half of installers installing fewer than five systems. At the same time, a subset of high-volume installers accumulated market share, especially beginning aroundmore » 2010 with the emergence of alternative customer financing options.« less

  9. NASA Information Resources Management Long Range Plan, FY 1994-1998

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.

  10. QUEST/Ada (Query Utility Environment for Software Testing) of Ada: The development of a program analysis environment for Ada

    NASA Technical Reports Server (NTRS)

    Brown, David B.

    1988-01-01

    A history of the Query Utility Environment for Software Testing (QUEST)/Ada is presented. A fairly comprehensive literature review which is targeted toward issues of Ada testing is given. The definition of the system structure and the high level interfaces are then presented. The design of the three major components is described. The QUEST/Ada IORL System Specifications to this point in time are included in the Appendix. A paper is also included in the appendix which gives statistical evidence of the validity of the test case generation approach which is being integrated into QUEST/Ada.

  11. Catalog of infrared observations. Part 2: Appendixes

    NASA Technical Reports Server (NTRS)

    Gezari, Daniel Y.; Schmitz, Marion; Mead, Jaylee M.

    1987-01-01

    The Catalog of Infrared Observations (CIO) is a compilation of infrared astronomical observational data obtained from an extensive literature search of astronomical journals and major astronomical catalogs and surveys. The literature searches are complete for years 1965 to 1986. Supporting appendixes are published in this part. The appendices include an atlas of infrared source positions, two bibliographies of infrared literature upon which the search was based, and, keyed to the main Catalog listings (organized alphabetically by first author, and by date), an atlas of infrared spectral ranges, and IRAS data for the CIO sources. The complete CIO database is available to qualified users in printed microfiche and magnetic tape formats.

  12. Cattaraugus Creek Harbor, New York General Design Memorandum. Phase II. (Detailed Design). Volume II. Appendix E. Littoral Processes and Sedimentation in the Cattaraugus Embayment, New York. Appendix F. Sediment Transport in Cattaraugus Creek.

    DTIC Science & Technology

    1976-03-01

    beaches than any other part of the southeastern shoreline of Lake Erie . It is the only major sand accumulation zone with the exception of Presque Isle , in...52 20. Photographs of zonal site #10. 54 21. Photograph and map of zonal site #11, Presque Isle , Pa. 57 F22. Photographs and beach profiles at zonal...site #11. 59 23. Photograph of zonal site #12, the recurved spit area on Presque Isle , Pa. 62 24. Block diagram of recurved spit area of Presque Isle

  13. CERN experience and strategy for the maintenance of cryogenic plants and distribution systems

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.

    2015-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. After several years of exploitation of a wide range of cryogenic installations and in particular following the last two years major shutdown to maintain and consolidate the LHC machine, we have analysed and reviewed the maintenance activities to implement an efficient and reliable exploitation of the installations. We report the results, statistics and lessons learned on the maintenance activities performed and in particular the required consolidations and major overhauling, the organization, management and methodologies implemented.

  14. Three-month performance evaluation of the Nanometrics, Inc., Libra Satellite Seismograph System in the northern California Seismic Network

    USGS Publications Warehouse

    Oppenheimer, David H.

    2000-01-01

    In 1999 the Northern California Seismic Network (NCSN) purchased a Libra satellite seismograph system from Nanometrics, Inc to assess whether this technology was a cost-effective and robust replacement for their analog microwave system. The system was purchased subject to it meeting the requirements, criteria and tests described in Appendix A. In early 2000, Nanometrics began delivery of various components of the system, such as the hub and remote satellite dish and mounting hardware, and the NCSN installed and assembled most equipment in advance of the arrival of Nanometrics engineers to facilitate the configuration of the system. The hub was installed in its permanent location, but for logistical reasons the "remote" satellite hardware was initially configured at the NCSN for testing. During the first week of April Nanometrics engineers came to Menlo Park to configure the system and train NCSN staff. The two dishes were aligned with the satellite, and the system was fully operational in 2 days with little problem. Nanometrics engineers spent the remaining 3 days providing hands-on training to NCSN staff in hardware/software operation, configuration, and maintenance. During the second week of April 2000, NCSN staff moved the entire remote system of digitizers, dish assembly, and mounting hardware to Mammoth Lakes, California. The system was reinstalled at the Mammoth Lakes water treatment plant and communications successfully reestablished with the hub via the satellite on 14 April 2000. The system has been in continuous operation since then. This report reviews the performance of the Libra system for the three-month period 20 April 2000 through 20 July 2000. The purpose of the report is to assess whether the system passed the acceptance tests described in Appendix A. We examine all data gaps reported by NCSN "gap list" software and discuss their cause.

  15. STS-74 Space Shuttle Mission Report

    NASA Technical Reports Server (NTRS)

    Fricke, Robert W., Jr.

    1996-01-01

    The STS-74 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the seventy-third flight of the Space Shuttle Program, the forty-eighth flight since the return-to-flight, and the fifteenth flight of the Orbiter Atlantis (OV-104). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-74; three Phase 11 SSME's that were designated as serial numbers 2012, 2026, and 2032 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-076. The RSRM's, designated RSRM-51, were installed in each SRB and the individual RSRM's were designated as 360TO51 A for the left SRB, and 360TO51 B for the right SRB. The primary objectives of this flight were to rendezvous and dock with the Mir Space Station and perform life sciences investigations. The Russian Docking Module (DM) was berthed onto the Orbiter Docking System (ODS) using the Remote Manipulator System (RMS), and the Orbiter docked to the Mir with the DM. When separating from the Mir, the Orbiter undocked, leaving the DM attached to the Mir. The two solar arrays, mounted on the DM, were delivered for future Russian installation to the Mir. The secondary objectives of the flight were to perform the operations necessary to fulfill the requirements of the GLO experiment (GLO-4)/Photogrammetric Appendage Structural Dynamics Experiment Payload (PASDE) (GPP), the IMAX Cargo Bay Camera (ICBC), and the Shuttle Amateur Radio Experiment-2 (SAREX-2). Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (GMT)) and mission elapsed time (MET).

  16. Using Residential Solar PV Quote Data to Analyze the Relationship Between Installer Pricing and Firm Size

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Shaughnessy, Eric; Margolis, Robert

    2017-04-01

    The vast majority of U.S. residential solar PV installers are small local-scale companies, however the industry is relatively concentrated in a few large national-scale installers. We develop a novel approach using solar PV quote data to study the price behavior of large solar PV installers in the United States. Through a paired differences approach, we find that large installer quotes are about higher, on average, than non-large installer quotes made to the same customer. The difference is statistically significant and robust after controlling for factors such as system size, equipment quality, and time effects. The results suggest that low pricesmore » are not the primary value proposition of large installer systems. We explore several hypotheses for this finding, including that large installers are able to exercise some market power and/or earn returns from reputations.« less

  17. 28 CFR Appendix C to Part 36 - Guidance on ADA Regulation on Nondiscrimination on the Basis of Disability by Public...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... individual meets any one of these three tests, he or she is considered to be an individual with a disability... established in 1974. Test A—A Physical or Mental Impairment That Substantially Limits One or More of the Major... impairment. Substantial limitation of a major life activity. Under Test A, the impairment must be one that...

  18. 28 CFR Appendix C to Part 36 - Guidance on ADA Regulation on Nondiscrimination on the Basis of Disability by Public...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... individual meets any one of these three tests, he or she is considered to be an individual with a disability... established in 1974. Test A—A Physical or Mental Impairment That Substantially Limits One or More of the Major... impairment. Substantial limitation of a major life activity. Under Test A, the impairment must be one that...

  19. 28 CFR Appendix C to Part 36 - Guidance on ADA Regulation on Nondiscrimination on the Basis of Disability by Public...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... individual meets any one of these three tests, he or she is considered to be an individual with a disability... established in 1974. Test A—A Physical or Mental Impairment That Substantially Limits One or More of the Major... impairment. Substantial limitation of a major life activity. Under Test A, the impairment must be one that...

  20. 28 CFR Appendix C to Part 36 - Guidance on ADA Regulation on Nondiscrimination on the Basis of Disability by Public...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... individual meets any one of these three tests, he or she is considered to be an individual with a disability... established in 1974. Test A—A Physical or Mental Impairment That Substantially Limits One or More of the Major... impairment. Substantial limitation of a major life activity. Under Test A, the impairment must be one that...

  1. Evaluation Study of Family Nurse Practitioners in US Army Health Care.

    DTIC Science & Technology

    1982-01-01

    Practitioners: The Family Nurse Practitioner Survey consisted of five parts: (1) Demographic; (2) Attitude Scale; (3) Present Assignment; (4) Role...Demographics; (2) Attitudes ; and (3) Role Functions/Diagnostic Categories. All results are displayed in Appendix 2. The information on the functions/diagnostic...requirements at least at the major Family Practice Departments for the FNP. This attitude is shared by a great majority of the ANC nurse managers queried

  2. Teacher's Guide for Earthworms.

    ERIC Educational Resources Information Center

    Bruno, Merle S.; And Others

    This teacher's guide on earthworms includes four major sections: (1) introduction, (2) caring for earthworms in the classroom, (3) classroom activities, and (4) the appendix. The introduction includes information concerning grade level, scheduling, materials, obtaining earthworms, field study, classroom clean-up, and records. Caring for earthworms…

  3. Strategic assessment of the Highway Performance Monitoring System

    DOT National Transportation Integrated Search

    1995-02-01

    The appendix contains a series of border crossing profiles covering the major, and in some cases, minor crossings in the border frontier. The frontier itself is a definition created for the 6015 Study to aid in the analysis of trade and traffic flows...

  4. 40 CFR Appendix E to Part 300 - Oil Spill Response

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and Health Administration RSPA—Research and Special Programs Administration USCG—United States Coast... major discharge regardless of the following quantitative measures: (a) Minor discharge means a discharge... protection of response teams and necessary research, development, demonstration, and evaluation to improve...

  5. 40 CFR Appendix E to Part 300 - Oil Spill Response

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and Health Administration RSPA—Research and Special Programs Administration USCG—United States Coast... major discharge regardless of the following quantitative measures: (a) Minor discharge means a discharge... protection of response teams and necessary research, development, demonstration, and evaluation to improve...

  6. 40 CFR Appendix E to Part 300 - Oil Spill Response

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and Health Administration RSPA—Research and Special Programs Administration USCG—United States Coast... major discharge regardless of the following quantitative measures: (a) Minor discharge means a discharge... protection of response teams and necessary research, development, demonstration, and evaluation to improve...

  7. Superfund Record of Decision (EPA Region 3): Allegany Ballistics Laboratory (USNavy), Operable Unit 1, Mineral, WV, February 12, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-01-01

    This decision document presents the selected remedial action for Site 5 Landfill Contents and Surface Soil at the Allegany Ballistics Laboratory (ABL), Rocket Center, West Virginia. The major components of the selected remedy are: Deed notation along with property use and limited access restrictions; Installation of a composite CAP-GCL and FMC; Installation of a drainage layer utilizing a geonet; Installation of a passive landfill gas (LFG) venting system; Revegetation of the capped area; Installation of perimeter drainage system; and Post-closure requirements.

  8. Rapid Transit Subways - Maintenance Guidelines for Engineering New Installations for Reduced Maintenance

    DOT National Transportation Integrated Search

    1978-01-01

    Economic design of new subways requires optimization of installation and maintenance costs of all the major constituent items. A prerequisite for this is an awareness of the rigorous environmental and other conditions imposed on the subway. Changing ...

  9. Rapid Transit Subways - Guidelines for Engineering New Installations for Reduced Maintenance

    DOT National Transportation Integrated Search

    1978-01-01

    Economic design of new subways requires optimization of installation and maintenance costs of all the major constituent items. A prerequisite for this is an awareness of the rigorous environmental and other conditions imposed on the subway. Changing ...

  10. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 2. Duluth International Airport, Duluth, Minnesota. Appendix

    DTIC Science & Technology

    1988-05-26

    tD o 11 11 11 -l m N1 -0 e a, 1 0...2E z z z z 2 z z z S SO, EB S IED O-. CDI z C z z z CP TD gD 2 i 2Qaniz z z z sa -@ 2N’. Us(~ -- (XJ 3 gN( C’Ea - 2E S00 0 00 00 00 00 00 00 00 0 a 4...dr.f mm, 10 fd, I---_1_~a -- ______________0 5;’~ SOAP- bAL -ft VU.-a& 44L PUMPING LXVEL 4bd .’ lM" -- ) fI ... ______ @-Ph. " o0 3s....4..0 a ir a.m

  11. Installation Restoration Program. Phase 1. Records Search, Air Force Plants Nos. 28 and 29, Everett and Lynn, MA

    DTIC Science & Technology

    1984-06-01

    APPENDIX E GLOSSARY OF TERMINOLOGY AND ABBREVIATIONS AF: Air Force. AFESC: Air Force Engineering and Services Center. 3E AFFF : Aqueous Film Forming Foam...34U - 0 ID 0 w M ol fc a, C’ 4) Em)4 Q 4)j 0 0 0 x "a x a. 13 As W a- cu I e W 4)-~ ? 4 -04.4 4.1. jl) in -U)4 0 14)~ ~~ ~~ ~ 0 0 00.4 4 ~ 4 )4 I...8 and 3 a; fC ;arit ,:On or Ccrce E rer ierat or: US.WI~ereral Electric - ’~’Yo lwi Unkrrown :.:e ;aeid by: E.ob Steele, 1,;hn Absalon, Ernie

  12. Force testing manual for the Langley 20-inch Mach 6 tunnel

    NASA Technical Reports Server (NTRS)

    Keyes, J. W.

    1977-01-01

    Data reduction and procedures for conducting force tests in a 20 inch Mach 6 tunnel are described. A discussion of pretest and testing phases are included. Items that are to be checked during model design and construction are outlined as well as safety requirements, starting loads tests, instructions for data acquisition and model installation. Measurement of balance and model misalignment and instructions for calibrating the angle of attack screen are covered. Procedures for making reference pressure, attitude tare, and data runs are included. The 20 inch tunnel force program is examined, and a description of data recording system input and load contrast sheets is given. An appendix presents a description, operating characteristics, and Mach number calibration of the tunnel, as well as tunnel characteristics.

  13. Installation Restoration Program Site Investigation Report - Volume 2, Appendix A-E. 254th Combat Communication Group/221st Combat Communication Squad. Garland, Texas.

    DTIC Science & Technology

    1995-04-01

    kg 1/26/94 8260I Methylenec chloride ɘ.012 0.012 m~y/kiy 1/26/94 8260 Meihyliuethacrylate ɘ.012 0.012 mg/kg 1/26/94 8260 4- Methyl -2-peritanone (MIBK...0.012 0.012 mgo/kg 1/23/94 8260 Methylmicthiacrylate < 0.012 0.012 mgL,/kg2 1/23/94 8260 4- Methyl -2-pcntanone (MIBK) < 0. 029 0.029 mg/kg 1/23/94 8260...8260EMethylene chloride ɘ.01 1 0.011 mgý/k~g 1/23/94 8260 Methyltnethiacrylate ɘ.011 0.011 mng/kg 1/23/94 8260 4- Methyl -2-pcntanone (MIBK) < 0.028

  14. Tank characterization report for double-shell tank 241-AW-105

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sasaki, L.M.

    1997-06-05

    One of the major functions of the Tank Waste Remediation System (TWRS) is to characterize wastes in support of waste management and disposal activities at the Hanford Site. Analytical data from sampling and analysis, along with other available information about a tank, are compiled and maintained in a tank characterization report (TCR). This report and its appendices serve as the TCR for double-shell tank 241-AW-105. The objectives of this report are to use characterization data in response to technical issues associated with tank 241-AW-105 waste; and to provide a standard characterization of this waste in terms of a best-basis inventorymore » estimate. The response to technical issues is summarized in Section 2.0, and the best-basis inventory estimate is presented in Section 3.0. Recommendations regarding safety status and additional sampling needs are provided in Section 4.0. Supporting data and information are contained in the appendices. This report supports the requirements of the Hanford Federal Facility Agreement and Consent Order milestone Characterization. information presented in this report originated from sample analyses and known historical sources. While only the results of a recent sampling event will be used to fulfill the requirements of the data quality objectives (DQOs), other information can be used to support or question conclusions derived from these results. Historical information for tank 241-AW-105 is provided in Appendix A, including surveillance information, records pertaining to waste transfers and tank operations, and expected tank contents derived from a process knowledge model. The recent sampling event listed, as well as pertinent sample data obtained before 1996, are summarized in Appendix B along with the sampling results. The results of the 1996 grab sampling event satisfied the data requirements specified in the sampling and analysis plan (SAP) for this tank. In addition, the tank headspace flammability was measured, which addresses one of the requirements specified in the safety screening DQO. The statistical analysis and numerical manipulation of data used in issue resolution are reported in Appendix C. Appendix D contains the evaluation to establish the best basis for the inventory estimate and the statistical analysis performed for this evaluation. A bibliography that resulted from an in-depth literature search of all known information sources applicable to tank 241-AW-105 and its respective waste types is contained in Appendix E. A majority of the documents listed in Appendix E may be found in the Tank Characterization and Safety Resource Center.« less

  15. 32 CFR Appendix A to Part 110 - Climatic Zones Used To Determine Rates of Commutation Allowance

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Virginia 42. Wisconsin 43. Wyoming The climate zones listed above are to be used as a guide to determine... commanders may request a zone change by submitting evidence to the Major Command of the appropriate Military...

  16. 32 CFR Appendix A to Part 110 - Climatic Zones Used To Determine Rates of Commutation Allowance

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Virginia 42. Wisconsin 43. Wyoming The climate zones listed above are to be used as a guide to determine... commanders may request a zone change by submitting evidence to the Major Command of the appropriate Military...

  17. 32 CFR Appendix A to Part 110 - Climatic Zones Used To Determine Rates of Commutation Allowance

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Virginia 42. Wisconsin 43. Wyoming The climate zones listed above are to be used as a guide to determine... commanders may request a zone change by submitting evidence to the Major Command of the appropriate Military...

  18. The Battle of Okinawa, 1945: Final Turning Point in the Pacific.

    ERIC Educational Resources Information Center

    Tzeng, Megan

    2000-01-01

    Reviews the last major battle of World War II that occurred at Okinawa (Japan) in 1945. Explains why the Battle of Okinawa was the turning point in World War II. Includes two maps in the appendix and an annotated bibliography. (CMK)

  19. 32 CFR 806b.7 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Review and provide final approval on Privacy Impact Assessments (see appendix E of this part). (2) Send a copy of approved Privacy Impact Assessments to Air Force Chief Information Officer/P. (i) Major Command.... (7) Review and provide recommendations on completed Privacy Impact Assessments for information...

  20. 32 CFR 806b.7 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Review and provide final approval on Privacy Impact Assessments (see appendix E of this part). (2) Send a copy of approved Privacy Impact Assessments to Air Force Chief Information Officer/P. (i) Major Command.... (7) Review and provide recommendations on completed Privacy Impact Assessments for information...

  1. 32 CFR 806b.7 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Review and provide final approval on Privacy Impact Assessments (see appendix E of this part). (2) Send a copy of approved Privacy Impact Assessments to Air Force Chief Information Officer/P. (i) Major Command.... (7) Review and provide recommendations on completed Privacy Impact Assessments for information...

  2. 32 CFR 806b.7 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Review and provide final approval on Privacy Impact Assessments (see appendix E of this part). (2) Send a copy of approved Privacy Impact Assessments to Air Force Chief Information Officer/P. (i) Major Command.... (7) Review and provide recommendations on completed Privacy Impact Assessments for information...

  3. Supervisors Guidebook: Driver and Traffic Safety Education.

    ERIC Educational Resources Information Center

    Aaron, James E.; And Others

    Intended for those responsible to organize, oversee, and evaluate a school's comprehensive traffic safety education program, this Illinois State guide contains nine major sections and appendixes. An introduction presents philosophy and status of the Illinois program, general goals and objectives, notes on relevant professional associations, and…

  4. The feasibility of accommodating physically handicapped individuals on pedestrian over and undercrossing structures. Appendix

    DOT National Transportation Integrated Search

    2008-09-01

    This report describes the evaluation of a sampling of over- and undercrossing structures to identify major and minor access barriers for the physically handicapped. From this evaluation, it was determined that it is feasible to accommodate the physic...

  5. 32 CFR Appendix A to Part 110 - Climatic Zones Used To Determine Rates of Commutation Allowance

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Virginia 42. Wisconsin 43. Wyoming The climate zones listed above are to be used as a guide to determine... commanders may request a zone change by submitting evidence to the Major Command of the appropriate Military...

  6. Careers in Water Pollution Control.

    ERIC Educational Resources Information Center

    Water Pollution Control Federation, Washington, DC.

    Described are the activities, responsibilities, and educational and training requirements of the major occupations directly concerned with water pollution control. Also provided is an overview of employment trends, salaries, and projected demand for employees. Included in the appendix is a list of colleges and universities which offer…

  7. Summary Document: Restoration Plan for Major Airports after a Bioterrorist Attack

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raber, E

    2007-01-11

    This document provides general guidelines for developing a Restoration Plan for a major airport following release of a biological warfare agent. San Francisco International Airport was selected as the example airport during development of the Plan to illustrate specific details. The spore forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the Plan is on activities associated with the Characterization, Remediation, and Clearancemore » Phases that are defined herein. Activities associated with the Notification and First-Response Phases are briefly discussed in Appendixes A and B, respectively. In addition to the main text of this Plan and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport.« less

  8. Exploitation of Self Organization in UAV Swarms for Optimization in Combat Environments

    DTIC Science & Technology

    2008-03-01

    behaviors and entangled hierarchy into Swarmfare [59] UAV simulation environment to include these models. • Validate this new model’s success through...Figure 4.3. The hierarchy of control emerges from the entangled hierarchy of the state relations at the simulation , swarm and rule/behaviors level...majors, major) Abstract Model Types (AMT) Figure A.1: SO Abstract Model Type Table 142 Appendix B. Simulators Comparision Name MATLAB Multi UAV MultiUAV

  9. Microterminal/Microfiche System for Computer-Based Instruction: Hardware and Software Development.

    DTIC Science & Technology

    1980-10-01

    Circuit Description and Schematic of Adaptor Module 57 Appendix C Circuit Description The schematics for circuitry used in the microfiche viewer and the...composed of four major components and associated interfaces. The major components are (a) mirroterminal. (Is) microfiche reader. (0) memory module , and (d...sensing of the position of the platen containing the microfiche so that frame locations can be verified by the microterminal software. The memory module is

  10. Atoms and Molecules Interacting with Light

    NASA Astrophysics Data System (ADS)

    van der Straten, Peter; Metcalf, Harold

    2016-02-01

    Part I. Atom-Light Interaction: 1. The classical physics pathway; Appendix 1.A. Damping force on an accelerating charge; Appendix 1.B. Hanle effect; Appendix 1.C. Optical tweezers; 2. Interaction of two-level atoms and light; Appendix 2.A. Pauli matrices for motion of the bloch vector; Appendix 2.B. The Ramsey method; Appendix 2.C. Echoes and interferometry; Appendix 2.D. Adiabatic rapid passage; Appendix 2.E Superposition and entanglement; 3. The atom-light interaction; Appendix 3.A. Proof of the oscillator strength theorem; Appendix 3.B. Electromagnetic fields; Appendix 3.C. The dipole approximation; Appendix 3.D. Time resolved fluorescence from multi-level atoms; 4. 'Forbidden' transitions; Appendix 4.A. Higher order approximations; 5. Spontaneous emission; Appendix 5.A. The quantum mechanical harmonic oscillator; Appendix 5.B. Field quantization; Appendix 5.C. Alternative theories to QED; 6. The density matrix; Appendix 6.A. The Liouville-von Neumann equation; Part II. Internal Structure: 7. The hydrogen atom; Appendix 7.A. Center-of-mass motion; Appendix 7.B. Coordinate systems; Appendix 7.C. Commuting operators; Appendix 7.D. Matrix elements of the radial wavefunctions; 8. Fine structure; Appendix 8.A. The Sommerfeld fine-structure constant; Appendix 8.B. Measurements of the fine structure 9. Effects of the nucleus; Appendix 9.A. Interacting magnetic dipoles; Appendix 9.B. Hyperfine structure for two spin =2 particles; Appendix 9.C. The hydrogen maser; 10. The alkali-metal atoms; Appendix 10.A. Quantum defects for the alkalis; Appendix 10.B. Numerov method; 11. Atoms in magnetic fields; Appendix 11.A. The ground state of atomic hydrogen; Appendix 11.B. Positronium; Appendix 11.C. The non-crossing theorem; Appendix 11.D. Passage through an anticrossing: Landau-Zener transitions; 12. Atoms in electric fields; 13. Rydberg atoms; 14. The helium atom; Appendix 14.A. Variational calculations; Appendix 14.B. Detail on the variational calculations of the ground state; 15. The periodic system of the elements; Appendix 15. A paramagnetism; Appendix 15.B. The color of gold; 16. Molecules; Appendix 16.A. Morse potential; 17. Binding in the hydrogen molecule; Appendix 17.A. Confocal elliptical coordinates; Appendix 17.B. One-electron two-center integrals; Appendix 17.C. Electron-electron interaction in molecular hydrogen; 18. Ultra-cold chemistry; Part III. Applications: 19. Optical forces and laser cooling; 20. Confinement of neutral atoms; 21. Bose-Einstein condensation; Appendix 21.A. Distribution functions; Appendix 21.B. Density of states; 22. Cold molecules; 23. Three level systems; Appendix 23.A. General Case for _1 , _2; 24. Fundamental physics; Part IV. Appendices: Appendix A. Notation and definitions; Appendix B. Units and notation; Appendix C. Angular momentum in quantum mechanics; Appendix D. Transition strengths; References; Index.

  11. Physics of Electronic Materials

    NASA Astrophysics Data System (ADS)

    Rammer, Jørgen

    2017-03-01

    1. Quantum mechanics; 2. Quantum tunneling; 3. Standard metal model; 4. Standard conductor model; 5. Electric circuit theory; 6. Quantum wells; 7. Particle in a periodic potential; 8. Bloch currents; 9. Crystalline solids; 10. Semiconductor doping; 11. Transistors; 12. Heterostructures; 13. Mesoscopic physics; 14. Arithmetic, logic and machines; Appendix A. Principles of quantum mechanics; Appendix B. Dirac's delta function; Appendix C. Fourier analysis; Appendix D. Classical mechanics; Appendix E. Wave function properties; Appendix F. Transfer matrix properties; Appendix G. Momentum; Appendix H. Confined particles; Appendix I. Spin and quantum statistics; Appendix J. Statistical mechanics; Appendix K. The Fermi-Dirac distribution; Appendix L. Thermal current fluctuations; Appendix M. Gaussian wave packets; Appendix N. Wave packet dynamics; Appendix O. Screening by symmetry method; Appendix P. Commutation and common eigenfunctions; Appendix Q. Interband coupling; Appendix R. Common crystal structures; Appendix S. Effective mass approximation; Appendix T. Integral doubling formula; Bibliography; Index.

  12. Photovoltaic energy system at an Alaskan site. Research report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Das, D.K.; Briggs, R.W.

    1991-01-01

    The study presented herein provides information gathered over several years on the availability of solar energy and its utilization by a photovoltaic (PV) system installed near Fairbanks (65 N latitude) to demonstrate its feasibility. The study addresses both theoretical and experimental investigations on the potential of solar energy for interior Alaska. Three theoretical approaches are described for calculation solar radiation using American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE), Liu-Jordan, and Collares-Pereira and Rabl models. Computer programs for these theories have been included in the Appendix of the report. The actual test setup of a PV system withmore » all its auxiliary components installed in Haystack (near Fairbanks) and the electrical loads run by it have been described in detail. Four and one-half years of solar radiation measurements and operational experience with the system are documented. Finally, comparisons are made between the measured solar radiation with previous measurements done at the Geophysical Institute of the University of Alaska Fairbanks, and the calculated values from the three models cited earlier. The information from the study should be useful to interested users in interior Alaska and perhaps to other countries of the world located in similar northern latitudes.« less

  13. 32 CFR Appendix B to Part 47 - The DoD Civilian/Military Service Review Board and the Advisory Panel

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... break a tie. The board's decision is determined by majority vote. The president and two voting members... only needs to state the reasons why the group is ineligible for consideration under this part. 3. If...

  14. 32 CFR Appendix F to Part 651 - Glossary

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... environmental documentation and its thorough consideration in the decision-making process. Major Federal Action... necessary to coordinate and staff analyses or present the results of the analyses to the public or decision.... Headquarters, Department of the Army proponent As the principal planner, implementer, and decision authority...

  15. Peterson's Register of Higher Education. 1990. Third Edition.

    ERIC Educational Resources Information Center

    Wells, John, Ed.; And Others

    This reference book on accredited institutions of higher education in the United States provides profiles of over 3,500 colleges and universities. The Guide is organized into three major sections: institutional profiles (arranged alphabetically by institution name); appendixes; and indexes. An introduction presents criteria for inclusion, data…

  16. A "Canned" Computer Lab

    ERIC Educational Resources Information Center

    Dowling, John, Jr.

    1972-01-01

    Discusses the use of a set of computer programs (FORTRAN IV) in an introductory mechanics course for science majors. One laboratory activity is described for determining the coefficient of restitution of a glider on an air track. A student evaluation for the lab is included in the appendix. (Author/TS)

  17. 18 CFR Appendix A to Part 2 - Guidance for Determining the Acceptable Construction Area for Replacements

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... Typical work spaces are: Item Typical extra area (width/length) Two lane road (bored) 25-50 by 100 feet. Four lane road (bored) 50 by 100 feet. Major river (wet cut) 100 by 200 feet. Intermediate stream (wet...

  18. 50 CFR 23.85 - What is a meeting of the Conference of the Parties (CoP)?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ENDANGERED SPECIES OF WILD FAUNA AND FLORA (CITES) CITES Administration § 23.85 What is a meeting of the... to the lists of species in Appendix I and II and resolutions by a two-thirds majority of Parties...

  19. 50 CFR 23.85 - What is a meeting of the Conference of the Parties (CoP)?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ENDANGERED SPECIES OF WILD FAUNA AND FLORA (CITES) CITES Administration § 23.85 What is a meeting of the... to the lists of species in Appendix I and II and resolutions by a two-thirds majority of Parties...

  20. 50 CFR 23.85 - What is a meeting of the Conference of the Parties (CoP)?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENDANGERED SPECIES OF WILD FAUNA AND FLORA (CITES) CITES Administration § 23.85 What is a meeting of the... to the lists of species in Appendix I and II and resolutions by a two-thirds majority of Parties...

  1. 50 CFR 23.85 - What is a meeting of the Conference of the Parties (CoP)?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ENDANGERED SPECIES OF WILD FAUNA AND FLORA (CITES) CITES Administration § 23.85 What is a meeting of the... to the lists of species in Appendix I and II and resolutions by a two-thirds majority of Parties...

  2. 50 CFR 23.85 - What is a meeting of the Conference of the Parties (CoP)?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ENDANGERED SPECIES OF WILD FAUNA AND FLORA (CITES) CITES Administration § 23.85 What is a meeting of the... to the lists of species in Appendix I and II and resolutions by a two-thirds majority of Parties...

  3. Prevention of Major Accident Hazards (MAHs) in major Hazard Installation (MHI) premises via land use planning (LUP): a review

    NASA Astrophysics Data System (ADS)

    Khudbiddin, M. Q.; Rashid, Z. A.; Yeong, A. F. M. S.; Alias, A. B.; Irfan, M. F.; Fuad, M.; Hayati, H.

    2018-03-01

    For a number of years, there is a concern about the causes of major hazards, their identification, risk assessment and the process of its management from the global perspective on the activities of the industries due to the protection of the environment, human and property. Though, industries cannot take pleasure in their business by harming the nature of the land, there are a number of measures that need to be put into consideration by the industries. Such measures are in terms of management and safety for the businesses, lives, properties, as well as the environment. The lack of consideration in the selected appropriate criteria can result in major accidental hazards (MAHs). This paper will review the land use planning (LUP) methods used in the past and present to prevent major accident hazards at major hazard installation (MHI).

  4. Evaluation of "Autosense-III" laser detection technology for traffic applications on I-4

    DOT National Transportation Integrated Search

    2001-11-01

    The major tasks of this project include procuring the two AUTOSENSE III units; selecting a site on I-4 for installation of the units, installing the units successfully on I-4, establishing a remote communication link through cellular data line to dow...

  5. 42 CFR Appendix E to Part 75 - Standards for Accreditation of Educational Programs for Radiation Therapy Technologists

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... universities; (b) Hospitals, clinics, or autonomous radiation oncology centers meeting the criteria for major... structure and function; (f) Oncologic pathology; (g) Radiation oncology; (h) Radiobiology; (i) Mathematics; (j) Radiation physics; (k) Radiation protection; (l) Radiation oncology technique; (m) Radiographic...

  6. 42 CFR Appendix E to Part 75 - Standards for Accreditation of Educational Programs for Radiation Therapy Technologists

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... universities; (b) Hospitals, clinics, or autonomous radiation oncology centers meeting the criteria for major... structure and function; (f) Oncologic pathology; (g) Radiation oncology; (h) Radiobiology; (i) Mathematics; (j) Radiation physics; (k) Radiation protection; (l) Radiation oncology technique; (m) Radiographic...

  7. 42 CFR Appendix E to Part 75 - Standards for Accreditation of Educational Programs for Radiation Therapy Technologists

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... universities; (b) Hospitals, clinics, or autonomous radiation oncology centers meeting the criteria for major... structure and function; (f) Oncologic pathology; (g) Radiation oncology; (h) Radiobiology; (i) Mathematics; (j) Radiation physics; (k) Radiation protection; (l) Radiation oncology technique; (m) Radiographic...

  8. 42 CFR Appendix E to Part 75 - Standards for Accreditation of Educational Programs for Radiation Therapy Technologists

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... universities; (b) Hospitals, clinics, or autonomous radiation oncology centers meeting the criteria for major... structure and function; (f) Oncologic pathology; (g) Radiation oncology; (h) Radiobiology; (i) Mathematics; (j) Radiation physics; (k) Radiation protection; (l) Radiation oncology technique; (m) Radiographic...

  9. Testing of state roadside safety systems. Volume XI, Appendix J -- Crash testing and evaluation of existing guardrail systems

    DOT National Transportation Integrated Search

    1999-04-01

    The purpose of this study is to crash test and evaluate new or modified roadside safety hardware and, where necessary, redesign the devices to improve their impact performance. The three major areas addressed in this study are the impact performance ...

  10. Teaching Critical Analysis of Election Coverage with Video Tape in the Introductory Course

    ERIC Educational Resources Information Center

    Eisenstein, James; Greenberg, George Douglas

    1976-01-01

    Improved understanding of political events and increased analytical skills are two contributions of a study of video taped media coverage of important political events, such as national elections. An appendix presents excerpts from the three major television networks' commentaries on election night 1972. (Author/DB)

  11. Teacher's Guide for Balloons and Gases.

    ERIC Educational Resources Information Center

    Griffith, Joe H.; And Others

    This guide was developed to provide children with an opportunity to prepare and collect several common gases and to discover and work with some of their properties. The guide is divided into five major sections: (1) introduction, (2) materials, (3) activities, (4) balloons aloft, and (5) an appendix. The introduction provides information…

  12. 32 CFR Appendix J to Part 154 - ADP Position Categories and Criteria for Designating Positions

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., and implementation of a computer security program; major responsibility for the direction, planning... agency computer security programs, and also including direction and control of risk analysis and/or... OF DEFENSE SECURITY DEPARTMENT OF DEFENSE PERSONNEL SECURITY PROGRAM REGULATION Pt. 154, App. J...

  13. 32 CFR Appendix J to Part 154 - ADP Position Categories and Criteria for Designating Positions

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., and implementation of a computer security program; major responsibility for the direction, planning... agency computer security programs, and also including direction and control of risk analysis and/or... OF DEFENSE SECURITY DEPARTMENT OF DEFENSE PERSONNEL SECURITY PROGRAM REGULATION Pt. 154, App. J...

  14. 32 CFR Appendix J to Part 154 - ADP Position Categories and Criteria for Designating Positions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., and implementation of a computer security program; major responsibility for the direction, planning... agency computer security programs, and also including direction and control of risk analysis and/or... OF DEFENSE SECURITY DEPARTMENT OF DEFENSE PERSONNEL SECURITY PROGRAM REGULATION Pt. 154, App. J...

  15. 32 CFR Appendix J to Part 154 - ADP Position Categories and Criteria for Designating Positions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., and implementation of a computer security program; major responsibility for the direction, planning... agency computer security programs, and also including direction and control of risk analysis and/or... OF DEFENSE SECURITY DEPARTMENT OF DEFENSE PERSONNEL SECURITY PROGRAM REGULATION Pt. 154, App. J...

  16. 32 CFR Appendix J to Part 154 - ADP Position Categories and Criteria for Designating Positions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., and implementation of a computer security program; major responsibility for the direction, planning... agency computer security programs, and also including direction and control of risk analysis and/or... OF DEFENSE SECURITY DEPARTMENT OF DEFENSE PERSONNEL SECURITY PROGRAM REGULATION Pt. 154, App. J...

  17. Highway Vehicle Retrofit Evaluation : Phase I. Analysis and Preliminary Evaluation Results. Volume 2. Sections 4 through 13 and Appendix.

    DOT National Transportation Integrated Search

    1975-11-01

    More than 20 representative classes of retrofit devices/concepts/techniques, including more than 130 specific items, were examined in the course of the study. A major portion of the analysis effort was directed to the evaluation of 16 advanced, novel...

  18. N+3 Aircraft Concept Designs and Trade Studies. Volume 2; Appendices-Design Methodologies for Aerodynamics, Structures, Weight, and Thermodynamic Cycles

    NASA Technical Reports Server (NTRS)

    Greitzer, E. M.; Bonnefoy, P. A.; delaRosaBlanco, E.; Dorbian, C. S.; Drela, M.; Hall, D. K.; Hansman, R. J.; Hileman, J. I.; Liebeck, R. H.; Lovegren, J.; hide

    2010-01-01

    Appendices A to F present the theory behind the TASOPT methodology and code. Appendix A describes the bulk of the formulation, while Appendices B to F develop the major sub-models for the engine, fuselage drag, BLI accounting, etc.

  19. Ihr Ticket fur Munchen (Your Ticket to Munich).

    ERIC Educational Resources Information Center

    Singer, Debbie

    Texts accompanied by photographs and drawings introduce students to four means of public transportation and to major tourist attractions in Munich, German Federal Republic. Vocabulary is glossed in the margin, and texts are followed by questions and exercises. Some suggestions for additional activities are given in English. An appendix includes…

  20. Container Technology Study : Volume 2. Appendixes.

    DOT National Transportation Integrated Search

    1980-10-01

    Volume II has nine appendixes as follows: Appendix A - Railroad Flatcar Data; Appendix B - Calculations; Appendix C - Record of Telephone Calls; Appendix D - Industry Interviews; Appendix E - Field Trips and Conferences; Appendix F - Annotated biblio...

  1. Fargo-Moorhead Urban Study. Water Supply Appendix. Volume 3. Phase 2, Attachment A: Geochemical Investigations of the Old Fargo Landfill.

    DTIC Science & Technology

    1985-05-01

    2 nHOLIES 2"IROCK LOWER LIMIT Of WASTE CELL UNDERLYING LAKE CLAYS DETAIL OF OBSERVATION WELLS INSTALLED IN 1981. FIGURE 3 V11 N8uber Depth to Botton ...ma- ~53 NOIJVAZ*I3 46 U = S. 4 9 U S .9 U I U ~! 0 I C a I i 15 ii liii I I ii. I SI I I UOLLVMdI3UUd aI,- Jo SIssot a S S aI - - a - U a -1*~ aw ...saarckJp 50 PIer.,4M-------- Chemist 11-22 I~et,D o~kota Stat* Depar’tment of H.Wh Public HealWi L-3horators I Lot tjmoer! 83-01’ 4494 g -Date Colectect

  2. Installation Restoration Program Stage 2-1 Remedial Investigation. Beale Air Force Base, Marysville, California. Volume 2. Appendix A

    DTIC Science & Technology

    1991-03-29

    S) A-927 BAFB-0427 22159-4 13-C-2SB (S) A-929 BAFB- 0428 22159-5 13-C-2SB (S) A-930 BAFB-0256 21872-11 13-C-2SB (S) A-931 BAFB-0429 22159-6 13-C-2SB (S...16 18-C-19SS (S) A-1305 BAFB-0021 21621-17 18-C-20SS (S) A- 1307 BAFB-0022 21621-18 18-C-20SS (S) A-1309 BAFB-0024 21621-20 18-C-21SS (S) A-1311 BAFB...ASA#9) 21.0 N/A MERCURY (SW7471) (Resampled for this analysis. See BAFB-0427 and BAFB- 0428 ) TFH-DIESEL (TFH-DIESEL) ə.3 1.3 mg/kg. (non-detect) TFH

  3. Installation Restoration Program. Stage 3. Remedial Investigation/ Feasibility Study. Elmendorf Air Force Base, Alaska. Volume 5. Appendix G

    DTIC Science & Technology

    1990-05-01

    Pentachloronitrobenzene ND mg/kg 2.5 S P henaceti n NO mg/kg 2- Picoline ND mg/kgI Pronamideh NO mg/kg 2.5I benzene ND mg/kg 2.5 2, 6-Di chi orophenol ND mg/kg 2.5 I...mg/kg 2.5 Pentachloronitrobenzene NO mg/kg 2.5 Phenaceti n ND mg/kg 2.5 2- Picoline ND mg/kg 2.5 Pronamide ND mg/kg 2.5 1 ,2,4,5-Tetrachloro benzene ND...Phenacetin ND mg/kg 2.5 2- Picoline ND mg/kg 2.5 Pronami de ND mg/kg 2.5 1,2,4,5-Tetrachlorobenzene ND mg/kg 2.5 2, 6-Di chi orophenol ND mg/kg 2.5 2-Methyl

  4. Seismic Stability Evaluation of Alben Barkley Dam and Lake Project. Volume 2. Geological and Seismological Evaluation.

    DTIC Science & Technology

    1986-06-01

    30 APPENDIX A: EARTHQUAKES AND GEOLOGY OF THE BARKLEY DAM AREA IN RELATION TO THE NEW MADRID EARTHQUAKE REGION TO...Dam is about 115 km from the source area of the New Madrid earthquakes of 1811-1812. Four major earthquakes are deduced to have occurred (Street and...hundreds of aftershocks, a dozen of which were felt over much of the central United States. Other major earthquakes that have happened in the New Madrid

  5. NASIS data base management system: IBM 360 TSS implementation. Volume 1: Installation standards

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The installation standards for the (NASIS) data base management system are presented. The standard approach to preparing systems documentation and the program design and coding rules and conventions are outlines. Included are instructions for preparing all major specifications and suggestions for improving the quality and efficency of the programming task.

  6. Bakeout Chamber Within Vacuum Chamber

    NASA Technical Reports Server (NTRS)

    Taylor, Daniel M.; Soules, David M.; Barengoltz, Jack B.

    1995-01-01

    Vacuum-bakeout apparatus for decontaminating and measuring outgassing from pieces of equipment constructed by mounting bakeout chamber within conventional vacuum chamber. Upgrade cost effective: fabrication and installation of bakeout chamber simple, installation performed quickly and without major changes in older vacuum chamber, and provides quantitative data on outgassing from pieces of equipment placed in bakeout chamber.

  7. INSTALLATION OF A 10-ELEMENT SHALLOW-BURIED ARRAY AT THE UINTA BASIN SEISMOLOGICAL OBSERVATORY, VERNAL, UTAH

    DTIC Science & Technology

    the array are buried to a depth of approximately 200 feet. This report outlines, in some detail, the installation of a buried array at the Uinta ... Basin Seismological Observatory. Major considerations in such an undertaking included the selection of the most effective array pattern and the most

  8. 10 CFR Appendix A to Subpart B of... - General Statement of Safety Basis Policy

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for the design and construction of a new DOE nuclear facility or a major modification to an existing... acceptable nuclear safety design criteria for use in preparing a preliminary documented safety analysis. As a... mitigate hazards to workers, the public, or the environment. They include (1) physical, design, structural...

  9. 40 CFR Appendix II to Subpart S of... - As-Received Testing Vehicle Rejection Criteria

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES... vehicle has been used for severe duty (trailer towing for passenger cars, snow plowing, racing) 4. The vehicle has a history of extensive collision damage or major engine repair (piston, crank, cylinder head...

  10. 40 CFR Appendix II to Subpart S of... - As-Received Testing Vehicle Rejection Criteria

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES... vehicle has been used for severe duty (trailer towing for passenger cars, snow plowing, racing) 4. The vehicle has a history of extensive collision damage or major engine repair (piston, crank, cylinder head...

  11. 40 CFR Appendix II to Subpart S of... - As-Received Testing Vehicle Rejection Criteria

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES... vehicle has been used for severe duty (trailer towing for passenger cars, snow plowing, racing) 4. The vehicle has a history of extensive collision damage or major engine repair (piston, crank, cylinder head...

  12. 40 CFR Appendix II to Subpart S of... - As-Received Testing Vehicle Rejection Criteria

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES... vehicle has been used for severe duty (trailer towing for passenger cars, snow plowing, racing) 4. The vehicle has a history of extensive collision damage or major engine repair (piston, crank, cylinder head...

  13. 7 CFR Appendix D to Subpart B of... - Technical Report for Flexible Fuel Pumps

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... flexible fuel pump projects, as defined in § 4280.103. (a) Qualifications of project team. The flexible fuel pump project team is expected to consist of a project manager, an equipment supplier of major... may serve more than one role. Authoritative evidence that project team service providers have the...

  14. 7 CFR Appendix D to Subpart B of... - Technical Report for Flexible Fuel Pumps

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... flexible fuel pump projects, as defined in § 4280.103. (a) Qualifications of project team. The flexible fuel pump project team is expected to consist of a project manager, an equipment supplier of major... may serve more than one role. Authoritative evidence that project team service providers have the...

  15. 7 CFR Appendix D to Subpart B of... - Technical Report for Flexible Fuel Pumps

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... flexible fuel pump projects, as defined in § 4280.103. (a) Qualifications of project team. The flexible fuel pump project team is expected to consist of a project manager, an equipment supplier of major... may serve more than one role. Authoritative evidence that project team service providers have the...

  16. 34 CFR Appendix C to Part 300 - National Instructional Materials Accessibility Standard (NIMAS)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... NIMAS is to help increase the availability and timely delivery of print instructional materials in... appendices, glossaries, bibliographies, and indices. It follows the of the book. level1 The highest-level container of major divisions of a book. Used in , , and to mark the largest divisions of the book (usually...

  17. 32 CFR 806b.32 - Submitting notices for publication in the Federal Register.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... managers must send a proposed notice, through the Major Command Privacy Office, to Air Force Chief... in appendix B to this part. For new systems, system managers must include a statement that a risk assessment was accomplished and is available should the Office of Management and Budget request it. ...

  18. 32 CFR 806b.32 - Submitting notices for publication in the Federal Register.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... managers must send a proposed notice, through the Major Command Privacy Office, to Air Force Chief... in appendix B to this part. For new systems, system managers must include a statement that a risk assessment was accomplished and is available should the Office of Management and Budget request it. ...

  19. ReSource Your Waste: A Teacher's Guide.

    ERIC Educational Resources Information Center

    Missouri State Dept. of Natural Resources, Jefferson City.

    This curriculum guide is intended for teachers of students in grades 4-8 and may be used as supplementary lessons, especially for science and social studies. The guide is divided into four major sections, a glossary, and large appendix. Sections include: (1) Sources of Resources; (2) Sources of Wastes; (3) Integrated Waste Management; and (4)…

  20. An Asset Management System for School Buildings in Quebec

    ERIC Educational Resources Information Center

    Gerbasi, Dino; Marchand, Gilles

    2005-01-01

    Presented here are the major reasons why an asset management system (AMS) is needed, a brief history of their evolution and a description of the initiative undertaken by Quebec to implement such a system. The appendix contains the recommended basic requirements for an asset management system. (Contains 1 figure and 4 footnotes.)

  1. Forest resources of Louisiana

    Treesearch

    James F. Rosson; William H. McWilliams; Paul D. Frey

    1988-01-01

    This report documents the findings of the fifth forest survey of Louisiana. Trend data on the forest resource are presented along with appropriate tables and figures. The appendix contains definitions of terms, a discussion of data reliability, a tree species list, and 22 standard statistical tables. Data are reported for January 1, 1984. Major highlights are listed...

  2. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 5, Dewatering report. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    This report provides an update on dewatering activities at the Durango disposal embankment and presents recommendations for the work required to complete the closure of the cell in 1990 (Section 2). In October 1989, test pit investigations were performed and a toe trench was excavated at the eastern slope of the disposal embankment. A description and results of the test pit investigations along with the implications . of the results relative to the over . all dewatering effort are discussed in Sections 3 through 5. Installation and performance of the 17-well dewatering system were previously described in` the ``StatusReport onmore » Dewatering of Disposal Embankment`` issued in September, 1989. Additional studies are still on-going and are described in Section 6. Laboratory analysis continues on samples taken from the test pits. TAC`s characterization of the hydrogeological conditions at the Durango site is also proceeding. Results of these studies will be presented in subsequent reports. Appendices A and B present construction details of the well point system, toe trench and holding pond. Appendix C summarizes the performance-of the 17 pumping wells prior to winter shutdown and provides information on pumping rates, drawdowns, and disposition of the wells. Appendix D outlines the chronology of the dewatering effort to date.« less

  3. Coal conversion legislation. Part I. Hearings before the Subcommittee on Energy Production and Supply of the Committee on Energy and Natural Resources, United States Senate, Ninety-Fifth Congress, First Session on S. 272, S. 273, and S. 977, March 21 and 29, 1977. [Coal utilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1977-01-01

    The legislation on greater coal utilization before the committee includes S. 272 (requiring, to the extent practicable, electric power plants and major fuel-bearing installations to utilize fuels other than natural gas); S. 273 (requiring, to the extent practicable, new electric power plants and new major fuel-burning installations be constructed to utliize fuels other than natural gas or petroleum); and S. 977 (requiring, to the extent practicable, existing electric power plants and major fuel-burning installations to utilize fuels other than natural gas or petroleum). Statements were heard from seven senators and representatives from the following: American Electric Power Service Corp., Americanmore » Boiler Manufactures Association, National Electric Reliability Council, Virgina Electric and Power Co., Fossil Power Systems, Houston Lighting and Power Co., other electric utility industry representatives, and the Federal Energy Adminstration. Additional material from the Wall Street Journal and the Washington Post is included. (MCW)« less

  4. AT on Buried LPG Tanks Over 13 m3: An Innovative and Practical Solution

    NASA Astrophysics Data System (ADS)

    Di Fratta, Crescenzo; Ferraro, Antonio; Tscheliesnig, Peter; Lackner, Gerald; Correggia, Vincenzo; Altamura, Nicola

    In Italy, since 2005, techniques based on Acoustic Emission have been introduced for testing of underground LPG tanks up to 13 m3, according to the European standard EN 12818:2004. The testing procedure for these tanks plans to install one or more pairs of sensors inside the "dome" suited for the access to the valves and fittings of the tank, directly on the accessible metal shell. This methodology is not applicable for the underground LPG buried tanks, where it is necessary to install a larger number of AE sensors, in order to cover at 100% the whole tank shell, even at very deep positions. Already in 2004, the European standard EN 12820 (Appendix C - Informative)give the possibility to use Acoustic Emission testing of LPG underground or buried tanks with a capacity exceeding 13 m3, but no technique was specified for the application. In 2008, TÜV AUSTRIA ITALIA - BLU SOLUTIONS srl - Italian company of TÜV AUSTRIA Group - has developed a technique to get access at tank shell, where tank capacity is greater than 13 m3 and its' diameter greater than 3,5 m. This methodology was fully in comply with the provisions of the European Standard EN 12819:2010, becoming an innovative solution widely appreciated and is used in Italy since this time. Currently, large companies and petrochemical plants, at the occurrence of the tank's requalification, have engaged TÜV AUSTRIA ITALIA - BLU SOLUTIONS to install such permanent predispositions, which allow access to the tank shell - test object - with diameters from 4 to 8 m. Through this access, you can install the AE sensors needed to cover at 100% the tank surface and then to perform AE test. In an economic crisis period, this technique is proving a valid and practically applicable answer, in order to reduce inspection costs and downtime by offering a technically advanced solution (AT), increasing the safety of the involved operators, protecting natural resources and the environment.

  5. Maintenance Resources by Building Use for U.S. Army Installations. Volume 2. Appendices A through H

    DTIC Science & Technology

    1991-05-01

    Installations, Volume II: Appendices A Through H RDTE dated 1980REIMB 1984 6 . AUTHOR(S) Edgar S. Neely and Robert D. Neathammer 7 . PERFORML’JG...Recurring Maintenance Factor 1.10 MRT For Major Cost Tasks and Replacement Tasks Decade 1 2 3 4 6 7 8 9 10 0 .000 .000 .000 .000 .000 .050 .190 .240 .300 .280...Special Condition Multiplier 1.00 Annual Recurring Maintenance Factor .79 MRT For Major Cost Tasks and Replacement Tasks Decade 1 2 3 4 6 7 8 9 10 0

  6. A Simple and Low-Cost Procedure for Growing Geobacter sulfurreducens Cell Cultures and Biofilms in Bioelectrochemical Systems

    PubMed Central

    O’Brien, J. Patrick; Malvankar, Nikhil S.

    2017-01-01

    Anaerobic microorganisms play a central role in several environmental processes and regulate global biogeochemical cycling of nutrients and minerals. Many anaerobic microorganisms are important for the production of bioenergy and biofuels. However, the major hurdle in studying anaerobic microorganisms in the laboratory is the requirement for sophisticated and expensive gassing stations and glove boxes to create and maintain the anaerobic environment. This appendix presents a simple design for a gassing station that can be used readily by an inexperienced investigator for cultivation of anaerobic microorganisms. In addition, this appendix also details the low-cost assembly of bioelectrochemical systems and outlines a simplified procedure for cultivating and analyzing bacterial cell cultures and biofilms that produce electric current, using Geobacter sulfurreducens as a model organism. PMID:27858972

  7. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-02-21

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less

  8. Geophysical investigation, Salmon Site, Lamar County, Mississippi

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Geophysical surveys were conducted in 1992 and 1993 on 21 sites at the Salmon Site (SS) located in Lamar County, Mississippi. The studies are part of the Remedial Investigation/Feasibility Study (RI/FS) being conducted by IT Corporation for the U.S. Department of Energy (DOE). During the 1960s, two nuclear devices and two chemical tests were detonated 826 meters (in) (2710 feet [ft]) below the ground surface in the salt dome underlying the SS. These tests were part of the Vela Uniform Program conducted to improve the United States capability to detect, identify, and locate underground nuclear detonations. The RI/FS is beingmore » conducted to determine if any contamination is migrating from the underground shot cavity in the salt dome and if there is any residual contamination in the near surface mud and debris disposal pits used during the testing activities. The objective of the surface geophysical surveys was to locate buried debris, disposal pits, and abandoned mud pits that may be present at the site. This information will then be used to identify the locations for test pits, cone penetrometer tests, and drill hole/monitor well installation. The disposal pits were used during the operation of the test site in the 1960s. Vertical magnetic gradient (magnetic gradient), electromagnetic (EM) conductivity, and ground-penetrating radar (GPR) surveys were used to accomplish these objectives. A description of the equipment used and a theoretical discussion of the geophysical methods are presented Appendix A. Because of the large number of figures relative to the number of pages of text, the geophysical grid-location maps, the contour maps of the magnetic-gradient data, the contour maps of the EM conductivity data, and the GPR traverse location maps are located in Appendix B, Tabs I through 22. In addition, selected GPR records are located in Appendix C.« less

  9. How to evaluate the risks of work equipment and installations for health and safety? Research and activities of the German Committee for Plant Safety and consequences for regulation.

    PubMed

    Pieper, R

    2012-01-01

    Work equipment and installations with a high risk for health and safety of employees should be paid a special attention. The German Product Safety Act, which is aimed to manufacturers or distributors in order to protect consumers, maintains a conclusive catalogue of these so-called "installations in need of monitoring" fixing the work equipment and installations for which such special inspections can be demanded. This catalogue has remained unchanged for decades and has been transformed nearly unmodified into the Plant Safety Ordinance. Currently, there is a discussion about this catalogue in Germany. A major point of concern is the definition and the significance of "especially" dangerous work equipment and installations. Two recent research projects are dealing with the problem how to define "especially".

  10. Social Sciences in Forestry, A Current Selected Bibliography, No. 57. Special Appendix: Theses and Dissertations in Progress.

    ERIC Educational Resources Information Center

    Schwab, Judith L., Ed.

    1982-01-01

    Documents which address the interface between forestry and the social sciences comprise this annotated bibliography. A subject-matter classification scheme is used to group publications by subheadings under five major heading: (1) social science applied to forestry at large; (2) applied to forestry's productive agents; (3) applied to forest…

  11. Spinoff, 1986

    NASA Technical Reports Server (NTRS)

    Haggerty, James J.

    1986-01-01

    The major programs that generate new technology and therefore expand the bank of knowledge available for future transfer are outlined. The focal point of this volume contains a representative sampling of spinoff products and processes that resulted from technology utilization, or secondary application. The various mechanisms NASA employs to stimulate technology utilization are described and in an appendix, are listed contact sources for further information.

  12. Collection, handling and analysis of specimens for studies of mucosal immunity in animals of veterinary importance - Appendix III

    USDA-ARS?s Scientific Manuscript database

    The validity of data in science depends on the reliability of the collection procedure and the methods used for data analysis. This becomes a major challenge in studies of mucosal immunology since samples for analysis come from various anatomical sources which differ remarkably in their content and ...

  13. A System Approach to Navy Medical Education and Training. Appendix 10. Operating Room Technician.

    DTIC Science & Technology

    1974-08-31

    WOUND 38 IPATCH EYES 39 IAPPLY/CHANGE SKIN GRAFT DRESSINGS 40 1APPLY/CHANGE PEDICLE SKIN GRAFT DRESSINGS 41 IFIRST ASSIST DURING MAJOR SURGERY 42...GRAFTS CIRCULATE 44 ISPLIT THICKN-cSS SKIN GRAFT SCRUB 45 ISPLIT THICKNESS SKIN GRAFT CIRCULATE 46 lHOMO GRAFTS SCRUB 47 IHOMO GRAFTS CIRCULATE 48

  14. New Curriculum Activities in the Pilot Intermediate Schools of New York City (& Appendix). Final Report.

    ERIC Educational Resources Information Center

    Ehrlich, Virginia Z.; Murray, Kay C.

    This report describes the intermediate school experiment which organized the middle schools to include grades 5 or 6 through 8, thus replacing the junior high school, grades 7 through 9. Major curriculum innovations were introduced in the areas of foreign language, the humanities, family living, typewriting, and creative and performing arts. The…

  15. Definition of avionics concepts for a heavy lift cargo vehicle, appendix A

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The major objective of the study task was to define a cost effective, multiuser simulation, test, and demonstration facility to support the development of avionics systems for future space vehicles. This volume provides the results of the main simulation processor selection study and describes some proof-of-concept demonstrations for the avionics test bed facility.

  16. The human factor: Biomedicine in the manned space program to 1980

    NASA Technical Reports Server (NTRS)

    Pitts, J. A.

    1985-01-01

    The purpose of this publication is to provide NASA personnel, NASA managers, and the biomedical and historical research communities a well-documented, historical summary of the content and organization of NASA's biomedical programs from Project Mercury up to the Shuttle program. The publication includes not only a major narrative portion, but appendixes and reference notes.

  17. Triage: a literature review 1985-1993.

    PubMed

    McDonald, L; Butterworth, T; Yates, D W

    1995-10-01

    Following an extensive literature review of Accident and Emergency (A & E) nursing from 1985-1993, the authors focused upon triage. A wide range of issues related to triage and its use in A & E departments are examined. An appendix is included to clarify major research finds in this area. Many of the claims made regarding triage require further investigation.

  18. 10 CFR Appendix D to Subpart D of... - Classes of Actions That Normally Require EISs

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .../operation/decommissioning of reactors D5. Main transmission system additions D6. Integrating transmission... waste) D1Strategic Systems, as defined in DOE Order 430.1, “Life-Cycle Asset Management,” and designated... facilities (that is, transmission system additions for integrating major new sources of generation into a...

  19. 28 CFR Appendix A to Part 35 - Guidance to Revisions to ADA Regulation on Nondiscrimination on the Basis of Disability in State...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... communicated effectively using handwritten notes. One major advocacy organization, for example, noted that the... example, blood work for routine lab tests or regular allergy shots. Video Interpreting Services... or combustion engines. One commenter suggested using exhaust level as the determinant. Although there...

  20. 28 CFR Appendix A to Part 35 - Guidance to Revisions to ADA Regulation on Nondiscrimination on the Basis of Disability in State...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... communicated effectively using handwritten notes. One major advocacy organization, for example, noted that the... example, blood work for routine lab tests or regular allergy shots. Video Interpreting Services... or combustion engines. One commenter suggested using exhaust level as the determinant. Although there...

  1. 28 CFR Appendix A to Part 35 - Guidance to Revisions to ADA Regulation on Nondiscrimination on the Basis of Disability in State...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... communicated effectively using handwritten notes. One major advocacy organization, for example, noted that the... example, blood work for routine lab tests or regular allergy shots. Video Interpreting Services... or combustion engines. One commenter suggested using exhaust level as the determinant. Although there...

  2. 28 CFR Appendix A to Part 35 - Guidance to Revisions to ADA Regulation on Nondiscrimination on the Basis of Disability in State...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... communicated effectively using handwritten notes. One major advocacy organization, for example, noted that the... example, blood work for routine lab tests or regular allergy shots. Video Interpreting Services... or combustion engines. One commenter suggested using exhaust level as the determinant. Although there...

  3. 23 CFR Appendix A to Subpart A of... - Guidance Criteria for Evaluating Requests for Interstate System Designations Under 23 U.S.C. 139...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS Federal... (a) and (b), of title 23, U.S.C., permits States to request the designation of National Highway...-distance Interstate and statewide travel of persons and goods. Typical examples of similar major...

  4. Spacelab payload accommodation handbook. Appendix A: Avionics interface definition

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The Spacelab side of the electrical interface between Spacelab subsystem equipment and experiments is presented. The electrical hardware which interfaces with the experiments is defined and the signal/load characteristics are stated. Major subsystems considered include: electrical power and distribution; command and data management subsystem; orbiter avionics via dedicated connectors of Spacelab; and electrical ground support equipment.

  5. A Survey of Secondary Mathematics Teacher Training Practices in West Germany and the Netherlands.

    ERIC Educational Resources Information Center

    Jansson, Lars C.

    The survey, conducted during 1979-80, focused on practices in the professional component of preservice teacher education in West Germany and the Netherlands. The report is divided into four major sections: (1) the structure of the questionnaire (included in the appendix), (2) the West Germany results, (3) the Dutch results, and (4) concluding…

  6. 40 CFR Appendix C to Part 132 - Great Lakes Water Quality Initiative Methodologies for Development of Human Health Criteria and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... organisms where higher doses or concentrations resulted in an adverse effect. Quantitative structure... probable or possible human carcinogen, when, because of major qualitative or quantitative limitations, the... quantitative risk assessment, but for which data are inadequate for Tier I criterion development due to a tumor...

  7. 40 CFR Appendix C to Part 132 - Great Lakes Water Quality Initiative Methodologies for Development of Human Health Criteria and...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... organisms where higher doses or concentrations resulted in an adverse effect. Quantitative structure... probable or possible human carcinogen, when, because of major qualitative or quantitative limitations, the... quantitative risk assessment, but for which data are inadequate for Tier I criterion development due to a tumor...

  8. 40 CFR Appendix C to Part 132 - Great Lakes Water Quality Initiative Methodologies for Development of Human Health Criteria and...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... organisms where higher doses or concentrations resulted in an adverse effect. Quantitative structure... probable or possible human carcinogen, when, because of major qualitative or quantitative limitations, the... quantitative risk assessment, but for which data are inadequate for Tier I criterion development due to a tumor...

  9. 24 CFR Appendix II to Subpart B of... - Homebuyers Ownership Opportunity Agreement (Turnkey III)

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... member of the Homebuyers Association having membership and purposes as set forth in the Articles of... securities approved by HUD and in accordance with any recommendations made by the HBA. If the HBA wishes to... roof, exterior painting, major repairs to heating and plumbing systems, etc. The NRMR shall not be used...

  10. REACH. Major Appliance.

    ERIC Educational Resources Information Center

    English, Charles; And Others

    As a part of the REACH (Refrigeration, Electro-Mechanical, Air-Conditioning, Heating) electromechanical cluster, this student manual contains individualized instructional units in the area of major appliances. The instructional units focus on installation of appliances, troubleshooting washing machines, troubleshooting electric dryers,…

  11. Selection criteria for using nighttime construction and maintenance operations : appendices.

    DOT National Transportation Integrated Search

    2003-05-01

    Appendix A: literature review and bibliography of related research; : Appendix B: survey instrument; : Appendix C: survey results; : Appendix D: Oregon crash analysis; : Appendix E: userguide to estimate road user costs; : Appendix F: the study of wo...

  12. Effect of emergency department CT on neuroimaging case volume and positive scan rates.

    PubMed

    Oguz, Kader Karli; Yousem, David M; Deluca, Tom; Herskovits, Edward H; Beauchamp, Norman J

    2002-09-01

    The authors performed this study to determine the effect a computed tomographic (CT) scanner in the emergency department (ED) has on neuroimaging case volume and positive scan rates. The total numbers of ED visits and neuroradiology CT scans requested from the ED were recorded for 1998 and 2000, the years before and after the installation of a CT unit in the ED. For each examination type (brain, face, cervical spine), studies were graded for major findings (those that affected patient care), minor findings, and normal findings. The CT utilization rates and positive study rates were compared for each type of study performed for both years. There was a statistically significant increase in the utilization rate after installation of the CT unit (P < .001). The fractions of studies with major findings, minor findings, and normal findings changed significantly after installation of the CT unit for facial examinations (P = .002) but not for brain (P = .12) or cervical spine (P = .24) examinations. In all types of studies, the percentage of normal examinations increased. In toto, there was a significant decrease in the positive scan rate after installation of the CT scanner (P = .004). After installation of a CT scanner in the ED, there was increased utilization and a decreased rate of positive neuroradiologic examinations, the latter primarily due to lower positive rates for facial CT scans.

  13. Center for Plant and Microbial Complex Carbohydrates at the University of Georgia Complex Carbohydrate Research Center: Progress Report for the Funding Period November 1, 2002 - October 31, 2003

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Albersheim, Peter; Darvill, Alan

    2003-10-31

    This progress report describes the research, service, and training activities conducted with the support of the DOE center grant. The research activities are summarized in the form of reprints or abstracts of 46 papers citing support from the DOE center grant that were produced during the reporting period. These papers include those that are published, in press, submitted, or in preparation. The papers include those produced entirely by CCRC personnel and those papers representing research work conducted in collaboration with scientists at other institutions. (See Appendix I.) A major component of this grant is to provide service to researchers atmore » other academic institutions and industries located throughout the US and other parts of the world. A summary of all our service activities during the reporting period is also included with this report, including samples of poly/oligosaccharides and antibodies distributed to scientists (see Appendix II). A description of the three training courses held at the CCRC during 2003 is also provided, together with the names and affiliations of participants who attended the courses (see Appendix III).« less

  14. REACT: Resettable Hold Down and Release Actuator for Space Applications

    NASA Astrophysics Data System (ADS)

    Nava, Nestor; Collado, Marcelo; Cabás, Ramiro

    2014-07-01

    A new HDRA based on SMA technology, called REACT, has been designed for development of loads and appendixes in space applications. This design involves a rod supported by spheres that block its axial movement during a preload application. The rod shape allows misalignment and blocks the rotation around axial axis for a proper installation of the device. Because of the high preload requirements for this type of actuators, finite element analysis (FEA) has been developed in order to check the structure resistance. The results of the FEA have constrained the REACT design, in terms of dimensions, materials, and shape of the mechanical parts. A complete test campaign for qualification of REACT is proposed. Several qualification models are intended to be built for testing in parallel. Therefore, it is a way to demonstrate margins which allows getting some statistics.

  15. Installation Restoration Program (IRP) Stage 3. McClellan Air Force Base. Operable Unit B. Preliminary Assessment Summary Report. Volume 1. Text, Appendix A & Part B. (Part 1)

    DTIC Science & Technology

    1991-10-01

    reflect the official position of the Air Force. "Accezoi a - . . . .. . NT:S C2 I - DTIC IA .; Ui’avll’ .- -, JJstificatin. By Dist ... . Al-4 , t...6625 SA 23 2 52 sm 30 LEGEND -122 .ANEAC D 42T 20Go4 824O SA ITE a- CHI LI SAU r41E FEC Fiur -. LoctinGfENDusra S-124 RA IA N SO POnATION material...V V V V aS 00 Sn 1 0 - 1.I 5 V I4 . V V VV V V V - V v vV VV ’A NS 11V V V WV 0 0- 44m N 0 C4 90 1, - All IA 0 000000000000 000 00 A-1.00444.5

  16. Trillium Horizon, A Small Portable Observatory Grade Seismometer For Direct Bury And Vault Use

    NASA Astrophysics Data System (ADS)

    Moores, A.; Parker, T.; Bainbridge, G.

    2017-12-01

    As of August 2017 almost 5 years of data have been collected from broadband seismic sensors designed for direct burial applications. These first posthole instruments have been deployed in a wide range of extremely challenging environments such as dynamic ice and snow environments, extreme wet and dry conditions in soils of high clay content, and steep creeping terrain. In all use cases the direct burial approach has consistently provided high quality data when compared to shallow vault installations. In this presentation we extract and analyze operational performance data, including tilt information from mass position time series recorded at direct burial installations and at temporary shallow vault deployments. This data shows that while higher tilt tolerance is required for data quality outcome certainty in some installations, the majority of installations can be addressed by a smaller instrument with a narrower tilt range hence reducing size and cost. The lessons learned from this real world field data have guided the development of a new smaller, less expensive instrument, Trillium Horizon.Based on this analysis and and user feedback from many direct burial deployments, the Trillium Horizon seismometer has been developed as a simple versatile instrument to span the majority of deployment scenarios and specific use cases including shallow direct bury deployments, traditional piers, and problematic wet vault installs. With its small size, robust waterproof case and connector, +/-1.5° tilt range, dual-purpose cable, and accessories for both posthole and vault installation, Trillium Horizon is optimized for usability as well as performance.

  17. Setting priorities for research on pollution reduction functions of agricultural buffers.

    PubMed

    Dosskey, Michael G

    2002-11-01

    The success of buffer installation initiatives and programs to reduce nonpoint source pollution of streams on agricultural lands will depend the ability of local planners to locate and design buffers for specific circumstances with substantial and predictable results. Current predictive capabilities are inadequate, and major sources of uncertainty remain. An assessment of these uncertainties cautions that there is greater risk of overestimating buffer impact than underestimating it. Priorities for future research are proposed that will lead more quickly to major advances in predictive capabilities. Highest priority is given for work on the surface runoff filtration function, which is almost universally important to the amount of pollution reduction expected from buffer installation and for which there remain major sources of uncertainty for predicting level of impact. Foremost uncertainties surround the extent and consequences of runoff flow concentration and pollutant accumulation. Other buffer functions, including filtration of groundwater nitrate and stabilization of channel erosion sources of sediments, may be important in some regions. However, uncertainty surrounds our ability to identify and quantify the extent of site conditions where buffer installation can substantially reduce stream pollution in these ways. Deficiencies in predictive models reflect gaps in experimental information as well as technology to account for spatial heterogeneity of pollutant sources, pathways, and buffer capabilities across watersheds. Since completion of a comprehensive watershed-scale buffer model is probably far off, immediate needs call for simpler techniques to gage the probable impacts of buffer installation at local scales.

  18. NASIS data base management system - IBM 360/370 OS MVT implementation. 1: Installation standards

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The installation standards for the NASA Aerospace Safety Information System (NASIS) data base management system are presented. The standard approach to preparing systems documentation and the program design and coding rules and conventions are outlined. Included are instructions for preparing all major specifications and suggestions for improving the quality and efficiency of the programming task.

  19. Toward quantifying water pollution abatement in response to installing buffers on crop land

    Treesearch

    Michael G. Dosskey

    2001-01-01

    The scientific research literature is reviewed (i) for evidence of how much reduction in nonpoint source pollution can be achieved by installing buffers on crop land, (ii) to summarize important factors that can affect this response, and (iii) to identify remaining major information gaps that limit our ability to make probable estimates. This review is intended to...

  20. Manufacturing and quality control of interconnecting wire harnesses, Volume 4

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The document covers interconnecting wire harnesses defined in the design standard, including type 8, flat conductor cable. Volume breadth covers installations of groups of harnesses in a major assembly and the associated post installation inspections and electrical tests. Knowledge gained through experience on the Saturn 5 program coupled with recent advances in techniques, materials, and processes was incorporated into this document.

  1. Columbia Accident Investigation Board Report. Volume Six

    NASA Technical Reports Server (NTRS)

    Barry, J. L.; Gehmann, H. W.; Deal, D. W.; Hallock, J. N.; Hess, K. W.

    2003-01-01

    In the course of its inquiry into the February 1, 2003 destruction of the Space Shuttle Columbia, the Columbia Accident Investigation Board conducted a series of public hearings at Houston, Texas; Cape Canaveral, Florida; and Washington, DC. Testimony from these hearings was recorded and then transcribed. This appendix, Volume VI of the Report, is a compilation of those transcripts. Contents: Transcripts of Board Public Hearings; Appendix H.1 March 6, 2003 Houston, Texas; Appendix H.2 March 17, 2003 Houston, Texas; Appendix H.3 March 18, 2003 Houston, Texas; Appendix H. 4 March 25, 2003 Cape Canaveral, Florida; Appendix H.5 March 26, 2003 Cape Canaveral, Florida; Appendix H.6 April 7, 2003 Houston, Texas; Appendix H.7 April 8, 2003 Houston, Texas; Appendix H.8 April 23, 2003 Houston, Texas; Appendix H.9 May 6, 2003 Houston, Texas; Appendix H.10 June 12, 2003 Washington, DC.

  2. An experimental investigation of the aerodynamics and cooling of a horizontally-opposed air-cooled aircraft engine installation

    NASA Technical Reports Server (NTRS)

    Miley, S. J.; Cross, E. J., Jr.; Owens, J. K.; Lawrence, D. L.

    1981-01-01

    A flight-test based research program was performed to investigate the aerodynamics and cooling of a horizontally-opposed engine installation. Specific areas investigated were the internal aerodynamics and cooling mechanics of the installation, inlet aerodynamics, and exit aerodynamics. The applicable theory and current state of the art are discussed for each area. Flight-test and ground-test techniques for the development of the cooling installation and the solution of cooling problems are presented. The results show that much of the internal aerodynamics and cooling technology developed for radial engines are applicable to horizontally opposed engines. Correlation is established between engine manufacturer's cooling design data and flight measurements of the particular installation. Also, a flight-test method for the development of cooling requirements in terms of easily measurable parameters is presented. The impact of inlet and exit design on cooling and cooling drag is shown to be of major significance.

  3. The Logistics Of Installing Pacs In An Existing Medical Center

    NASA Astrophysics Data System (ADS)

    Saarinen, Allan O.; Goodsitt, Mitchell M.; Loop, John W.

    1989-05-01

    A largely overlooked issue in the Picture Archiving and Communication Systems (PACS) area is the tremendous amount of site planning activity required to install such a system in an existing medical center. Present PACS equipment requires significant hospital real estate, specialized electrical power, cabling, and environmental controls to operate properly. Marshaling the hospital resources necessary to install PACS equipment requires many different players. The site preparation costs are nontrivial and usually include a number of hidden expenses. This paper summarizes the experience of the University of Washington Department of Radiology in installing an extensive digital imaging network (DIN) and PACS throughout the Department and several clinics in the hospital. The major logistical problems encountered at the University are discussed, a few recommendations are made, and the installation costs are documented. Overall, the University's site preparation costs equalled about seven percent (7%) of the total PACS equipment expenditure at the site.

  4. New safety rules challenge U. K. operators, regulators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hudson, J.

    1994-08-15

    Offshore safety regulations based on lessons learned from the Piper Alpha blast of 1988 have been in operation in the U.K. for a year. The Offshore Installations (Safety Case) Regulations 1992 make operators of fixed and mobile installations (the duty holders'') responsible for producing a formal safety assessment, or safety case, for each installation. After the end of November 1995 it will be an offense to operate an installation without a safety case which has been approved by the government's Health and Safety Executive (HSE). Producing safety cases for installations is a major task for duty holder, while assessing themmore » is a huge under taking for HSE's Offshore Safety Division (OSD). This paper reviews how HSE has established management arrangements to handle safety cases, considers progress in assessment, highlights some of the important lessons learned, and look to the future.« less

  5. Hazardous workplace review program in Taiwan.

    PubMed

    Chang, Yi-Kuo; Chuang, Kuen-Yuan; Tseng, Jo-Ming; Lin, Fang-Chen; Su, Teh-Sheng

    2013-01-01

    In Taiwan, relevant mid-term plans and projects of mitigating occupational hazards have been launched in recent years in the hopes of lowering the incidence of occupational hazards. In light of the lack of objective methodologies for researches on issues pertaining occupational safety and health, this research aims to explore the priorities of safety and health issues through focal groups, expert questionnaires and interviews on relevant issues such as hazard installations identified in R181 Prevention of Major Industrial Accidents Recommendation, 1993 proposed during the 18th World Congress on Safety and Health at work in Seoul 2008. Results revealed that distribute reports of major domestic/foreign occupational disasters to relevant sectors for the prevention of major accidents is needed, both from the importance and feasibility analysis. It is the only topic that scored over 4 points in average for expert and focal group consensus. Furthermore, the experts and focal groups came to consensus in the ranking of priority for 4 items, namely: 1) Installations containing/using large quantities of hazardous materials should be prioritized for inspection, 2) Incorporation of hazard installation review/inspection into OSH management system accreditation, 3) Impose operation shutdown as a means of penalty) and 4) Prioritize the promotion of preliminary PHA.

  6. On the origin of stars with and without planets. Tc trends and clues to Galactic evolution

    NASA Astrophysics Data System (ADS)

    Adibekyan, V. Zh.; González Hernández, J. I.; Delgado Mena, E.; Sousa, S. G.; Santos, N. C.; Israelian, G.; Figueira, P.; Bertran de Lis, S.

    2014-04-01

    We explore a sample of 148 solar-like stars to search for a possible correlation between the slopes of the abundance trends versus condensation temperature (known as the Tc slope) with stellar parameters and Galactic orbital parameters in order to understand the nature of the peculiar chemical signatures of these stars and the possible connection with planet formation. We find that the Tc slope significantly correlates (at more than 4σ) with the stellar age and the stellar surface gravity. We also find tentative evidence that the Tc slope correlates with the mean galactocentric distance of the stars (Rmean), suggesting that those stars that originated in the inner Galaxy have fewer refractory elements relative to the volatiles. While the average Tc slope for planet-hosting solar analogs is steeper than that of their counterparts without planets, this difference probably reflects the difference in their age and Rmean. We conclude that the age and probably the Galactic birth place are determinant to establish the star's chemical properties. Old stars (and stars with inner disk origin) have a lower refractory-to-volatile ratio. Based on observations collected with the HARPS spectrograph at the 3.6-m telescope (072.C-0488(E)), installed at the La Silla Observatory, ESO (Chile), with the UVES spectrograph at the 8-m Very Large Telescope program IDs: 67.C-0206(A), 074.C-0134(A), 075.D-0453(A), installed at the Cerro Paranal Observatory, ESO (Chile), and with the UES spectrograph at the 4.2-m William Herschel Telescope, installed at the Spanish Observatorio del Roque de los Muchachos of the Instituto de Astrofísica de Canarias, on the island of La Palma.Appendix A is available in electronic form at http://www.aanda.org

  7. 2011 Cost of Wind Energy Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tegen, S.; Lantz, E.; Hand, M.

    2013-03-01

    This report describes the levelized cost of energy (LCOE) for a typical land-based wind turbine installed in the United States in 2011, as well as the modeled LCOE for a fixed-bottom offshore wind turbine installed in the United States in 2011. Each of the four major components of the LCOE equation are explained in detail, such as installed capital cost, annual energy production, annual operating expenses, and financing, and including sensitivity ranges that show how each component can affect LCOE. These LCOE calculations are used for planning and other purposes by the U.S. Department of Energy's Wind Program.

  8. 29 CFR Appendix G to Subpart R of... - § 1926.502 (b)-(e) Fall Protection Systems Criteria and Practices

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., whenever relocated, after major repair, and at 6-month intervals if left in one place. The drop-test shall... depression of the snaphook keeper by the connected member, or shall be a locking type snaphook designed and... member to which they are connected to prevent unintentional disengagement of the snaphook by depression...

  9. 29 CFR Appendix G to Subpart R of... - § 1926.502 (b)-(e) Fall Protection Systems Criteria and Practices

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., whenever relocated, after major repair, and at 6-month intervals if left in one place. The drop-test shall... depression of the snaphook keeper by the connected member, or shall be a locking type snaphook designed and... member to which they are connected to prevent unintentional disengagement of the snaphook by depression...

  10. 29 CFR Appendix G to Subpart R of... - § 1926.502 (b)-(e) Fall Protection Systems Criteria and Practices

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., whenever relocated, after major repair, and at 6-month intervals if left in one place. The drop-test shall... depression of the snaphook keeper by the connected member, or shall be a locking type snaphook designed and... member to which they are connected to prevent unintentional disengagement of the snaphook by depression...

  11. 29 CFR Appendix G to Subpart R of... - § 1926.502 (b)-(e) Fall Protection Systems Criteria and Practices

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., whenever relocated, after major repair, and at 6-month intervals if left in one place. The drop-test shall... depression of the snaphook keeper by the connected member, or shall be a locking type snaphook designed and... member to which they are connected to prevent unintentional disengagement of the snaphook by depression...

  12. 29 CFR Appendix to Part 1630 - Interpretive Guidance on Title I of the Americans With Disabilities Act

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... standards, employment tests or other selection criteria that screen out or tend to screen out an individual with a disability or a class of individuals with disabilities unless the standard, test or other... limits one or more major life activities of an individual; (2) a record of such an impairment; or (3...

  13. 29 CFR Appendix to Part 1630 - Interpretive Guidance on Title I of the Americans With Disabilities Act

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... standards, employment tests or other selection criteria that screen out or tend to screen out an individual with a disability or a class of individuals with disabilities unless the standard, test or other... limits one or more major life activities of an individual; (2) a record of such an impairment; or (3...

  14. Advanced methods of structural and trajectory analysis for transport aircraft

    NASA Technical Reports Server (NTRS)

    Ardema, Mark D.

    1995-01-01

    This report summarizes the efforts in two areas: (1) development of advanced methods of structural weight estimation, and (2) development of advanced methods of trajectory optimization. The majority of the effort was spent in the structural weight area. A draft of 'Analytical Fuselage and Wing Weight Estimation of Transport Aircraft', resulting from this research, is included as an appendix.

  15. 34 CFR Appendix A to Part 100 - Federal Financial Assistance to Which These Regulations Apply

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of higher education (20 U.S.C. 701-758). 3. School Construction in federally-affected and in major... and employment of specialists in desegregation problems (42 U.S.C. 2000c-4). 20. Higher education... to students in institutions of higher education (Title IV, Higher Education Act of 1965, 20 U.S.C...

  16. Creating Feedback Channels With Optical Communications For Information Operations (IO)

    DTIC Science & Technology

    2016-06-01

    amphibious operations. Optical communications technologies, direct marketing principles , and current IO shortfalls are explored to determine whether...technology. First, these concepts are applied to show covert amphibious operations. Optical communications technologies, direct marketing principles , and...power, as per Appendix A. A major portion of the marketing campaign comes in the form of advertising. The correlating principles of advertising in

  17. 10 CFR Appendix E to Part 110 - Illustrative List of Chemical Exchange or Ion Exchange Enrichment Plant Equipment and Components...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... A major design concern is to avoid contamination of the process streams with certain metal ions... internal turbine mixers), especially designed or prepared for uranium enrichment using the chemical...) or glass. The stage residence time of the columns is designed to be short (30 seconds or less). (2...

  18. Low-cost Computer-Aided Instruction/Computer-Managed Instruction (CAI/ CMI) System: Feasibility Study

    DTIC Science & Technology

    1979-12-01

    capabilities that are not essential to routine support of the majority of Air Force training. TABLE OF CONTENTS PAGE 1.0 INTRODUCTION ...66 APPEINDIX A Listing of All Survey Items ---------------------- 67 APPENDIX B Introduction to Survey Form and...5 6 1.0 INTRODUCTION Prototype computer-based individualized training systems have been developed and implemented at a number of

  19. 33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... license for constructed major project affecting navigable waters of the united states Article 1. The..., terms, and conditions of the license. Article 2. No substantial change shall be made in the maps, plans... theretofore made a part of the license as may be specified by the Commission. Article 3. The project area and...

  20. T1 bright appendix sign to exclude acute appendicitis in pregnant women.

    PubMed

    Shin, Ilah; An, Chansik; Lim, Joon Seok; Kim, Myeong-Jin; Chung, Yong Eun

    2017-08-01

    To evaluate the diagnostic value of the T1 bright appendix sign for the diagnosis of acute appendicitis in pregnant women. This retrospective study included 125 pregnant women with suspected appendicitis who underwent magnetic resonance (MR) imaging. The T1 bright appendix sign was defined as a high intensity signal filling more than half length of the appendix on T1-weighted imaging. Sensitivity, specificity, positive predictive value (PPV) and negative predictive value (NPV) of the T1 bright appendix sign for normal appendix identification were calculated in all patients and in those with borderline-sized appendices (6-7 mm). The T1 bright appendix sign was seen in 51% of patients with normal appendices, but only in 4.5% of patients with acute appendicitis. The overall sensitivity, specificity, PPV, and NPV of the T1 bright appendix sign for normal appendix diagnosis were 44.9%, 95.5%, 97.6%, and 30.0%, respectively. All four patients with borderline sized appendix with appendicitis showed negative T1 bright appendix sign. The T1 bright appendix sign is a specific finding for the diagnosis of a normal appendix in pregnant women with suspected acute appendicitis. • Magnetic resonance imaging is increasingly used in emergency settings. • Acute appendicitis is the most common cause of acute abdomen. • Magnetic resonance imaging is widely used in pregnant population. • T1 bright appendix sign can be a specific sign representing normal appendix.

  1. Historic Properties Report: Kansas Army Ammunition Plant, Parsons, Kansas

    DTIC Science & Technology

    1984-11-01

    methodology; Chapter 2 presents an architectural, historical, and technological overview of the installation and its properties; and Chapter 3 identifies ...historic properties were identified by this source. Army records used for the field inventory included current Real Property Inventory (RPI) printouts that...text as appropriate. The objectives of the overview were to i) establish the periods of major construction at the installation, 2) identify important

  2. Challenger STS-17 (41-G) post-flight best estimate trajectory products: Development and summary results

    NASA Technical Reports Server (NTRS)

    Kelly, G. M.; Heck, M. L.; Mcconnell, J. G.; Waters, L. A.; Troutman, P. A.; Findlay, J. T.

    1985-01-01

    Results from the STS-17 (41-G) post-flight products are presented. Operational Instrumentation recorder gaps, coupled with the limited tracking coverage available for this high inclination entry profile, necessitated selection of an anchor epoch for reconstruction corresponding to an unusually low altitude of h approx. 297 kft. The final inertial trajectory obtained, BT17N26/UN=169750N, is discussed in Section I, i.e., relative to the problems encountered with the OI and ACIP recorded data on this Challenger flight. Atmospheric selection, again in view of the ground track displacement from the remote meteorological sites, constituted a major problem area as discussed in Section II. The LAIRS file provided by Langley was adopted, with NOAA data utilized over the lowermost approx. 7 kft. As discussed in Section II, the Extended BET, ST17BET/UN=274885C, suggests a limited upper altitude (H approx. 230 kft) for which meaningful flight extraction can be expected. This is further demonstrated, though not considered a limitation, in Section III wherein summary results from the AEROBET (NJ0333 with NJ0346 as duplicate) are presented. GTFILEs were generated only for the selected IMU (IMU2) and the Rate Gyro Assembly/Accelerometer Assembly data due to the loss of ACIP data. Appendices attached present inputs for the generation of the post-flight products (Appendix A), final residual plots (Appendix B), a two second spaced listing of the relevant parameters from the Extended BET (Appendix C), and an archival section (Appendix D) devoting input (source) and output files and/or physical reels.

  3. Environmental surveillance at Los Alamos during 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2006-09-30

    Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (LANL or the Laboratory) environmental organization, as required by US Department of Energy Order 5400.1, General Environmental Protection Program, and US Department of Energy Order 231.IA, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory's efforts to ensure public safety and to monitor environmental quality atmore » and near the Laboratory. Chapter 1 provides an overview of the Laboratory's major environmental programs. Chapter 2 reports the Laboratory's compliance status for 2005. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations. The environmental surveillance and monitoring data are organized by environmental media (Chapter 4, Air; Chapters 5 and 6, Water and Sediments; Chapter 7, Soils; and Chapter 8, Foodstuffs and Biota) in a format to meet the needs of a general and scientific audience. Chapter 9, new for this year, provides a summary of the status of environmental restoration work around LANL. A glossary and a list ofacronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the Laboratory's technical areas and their associated programs, and Appendix D provides web links to more information.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department ofmore » Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation.« less

  5. STS-76 Space Shuttle Mission Report

    NASA Technical Reports Server (NTRS)

    Fricke, Robert W., Jr.

    1996-01-01

    The STS-76 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the seventy-sixth flight of the Space Shuttle Program, the fifty-first flight since the return-to-flight, and the sixteenth flight of the Orbiter Atlantis (OV-104). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-77; three SSME's that were designated as serial numbers 2035, 2109, and 2019 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-079. The RSRM's, designated RSRM-46, were installed in each SRB and the individual RSRM's were designated as 360TO46A for the left SRB, and 360TO46B for the right SRB. The primary objectives of this flight were to rendezvous and dock with the Mir Space Station and transfer one U.S. Astronaut to the Mir. A single Spacehab module carried science equipment and hardware, Risk Mitigation Experiments (RME's), and Russian Logistics in support of the Phase 1 Program requirements. In addition, the European Space Agency (ESA) Biorack operations were performed. Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (GMT) and mission elapsed time (MET).

  6. Carbon sequestration by patch fertilization: A comprehensive assessment using coupled physical-ecological-biogeochemical models: FINAL REPORT of grant Grant No. DE-FG02-04ER63726

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sarmiento, Jorge L; Gnanadesikan, Anand; Gruber, Nicolas

    2007-06-21

    This final report summarizes research undertaken collaboratively between Princeton University, the NOAA Geophysical Fluid Dynamics Laboratory on the Princeton University campus, the State University of New York at Stony Brook, and the University of California, Los Angeles between September 1, 2000, and November 30, 2006, to do fundamental research on ocean iron fertilization as a means to enhance the net oceanic uptake of CO2 from the atmosphere. The approach we proposed was to develop and apply a suite of coupled physical-ecologicalbiogeochemical models in order to (i) determine to what extent enhanced carbon fixation from iron fertilization will lead to anmore » increase in the oceanic uptake of atmospheric CO2 and how long this carbon will remain sequestered (efficiency), and (ii) examine the changes in ocean ecology and natural biogeochemical cycles resulting from iron fertilization (consequences). The award was funded in two separate three-year installments: • September 1, 2000 to November 30, 2003, for a project entitled “Ocean carbon sequestration by fertilization: An integrated biogeochemical assessment.” A final report was submitted for this at the end of 2003 and is included here as Appendix 1. • December 1, 2003 to November 30, 2006, for a follow-on project under the same grant number entitled “Carbon sequestration by patch fertilization: A comprehensive assessment using coupled physical-ecological-biogeochemical models.” This report focuses primarily on the progress we made during the second period of funding subsequent to the work reported on in Appendix 1. When we began this project, we were thinking almost exclusively in terms of long-term fertilization over large regions of the ocean such as the Southern Ocean, with much of our focus being on how ocean circulation and biogeochemical cycling would interact to control the response to a given fertilization scenario. Our research on these types of scenarios, which was carried out largely during the first three years of our project, led to several major new insights on the interaction between ocean biogeochemistry and circulation. This work, which is described in 2 the following Section II on “Large scale fertilization,” has continued to appear in the literature over the past few years, including two high visibility papers in Nature. Early on in the first three years of our project, it became clear that small "patch-scale" fertilizations over limited regions of order 100 km diameter were much more likely than large scale fertilization, and we carried out a series of idealized patch fertilization simulations reported on in Gnanadesikan et al. (2003). Based on this paper and other results we had obtained by the end of our first three-year grant, we identified a number of important issues that needed to be addressed in the second three-year period of this grant. Section III on “patch fertilization” discusses the major findings of this phase of our research, which is described in two major manuscripts that will be submitted for publication in the near future. This research makes use of new more realistic ocean ecosystem and iron cycling models than our first paper on this topic. We have several major new insights into what controls the efficiency of iron fertilization in the ocean. Section IV on “model development” summarizes a set of papers describing the progress that we made on improving the ecosystem models we use for our iron fertilization simulations.« less

  7. Carbon sequestration by patch fertilization: A comprehensive assessment using coupled physical-ecological-biogeochemical models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sarmiento, Jorge L.; Gnanadesikan, Anand; Gruber, Nicolas

    2007-06-21

    This final report summarizes research undertaken collaboratively between Princeton University, the NOAA Geophysical Fluid Dynamics Laboratory on the Princeton University campus, the State University of New York at Stony Brook, and the University of California, Los Angeles between September 1, 2000, and November 30, 2006, to do fundamental research on ocean iron fertilization as a means to enhance the net oceanic uptake of CO2 from the atmosphere. The approach we proposed was to develop and apply a suite of coupled physical-ecological-biogeochemical models in order to (i) determine to what extent enhanced carbon fixation from iron fertilization will lead to anmore » increase in the oceanic uptake of atmospheric CO2 and how long this carbon will remain sequestered (efficiency), and (ii) examine the changes in ocean ecology and natural biogeochemical cycles resulting from iron fertilization (consequences). The award was funded in two separate three-year installments: September 1, 2000 to November 30, 2003, for a project entitled “Ocean carbon sequestration by fertilization: An integrated biogeochemical assessment.” A final report was submitted for this at the end of 2003 and is included here as Appendix 1; and, December 1, 2003 to November 30, 2006, for a follow-on project under the same grant number entitled “Carbon sequestration by patch fertilization: A comprehensive assessment using coupled physical-ecological-biogeochemical models.” This report focuses primarily on the progress we made during the second period of funding subsequent to the work reported on in Appendix 1. When we began this project, we were thinking almost exclusively in terms of long-term fertilization over large regions of the ocean such as the Southern Ocean, with much of our focus being on how ocean circulation and biogeochemical cycling would interact to control the response to a given fertilization scenario. Our research on these types of scenarios, which was carried out largely during the first three years of our project, led to several major new insights on the interaction between ocean biogeochemistry and circulation. This work, which is described in the following Section II on “Large scale fertilization,” has continued to appear in the literature over the past few years, including two high visibility papers in Nature. Early on in the first three years of our project, it became clear that small "patch-scale" fertilizations over limited regions of order 100 km diameter were much more likely than large scale fertilization, and we carried out a series of idealized patch fertilization simulations reported on in Gnanadesikan et al. (2003). Based on this paper and other results we had obtained by the end of our first three-year grant, we identified a number of important issues that needed to be addressed in the second three-year period of this grant. Section III on “patch fertilization” discusses the major findings of this phase of our research, which is described in two major manuscripts that will be submitted for publication in the near future. This research makes use of new more realistic ocean ecosystem and iron cycling models than our first paper on this topic. We have several major new insights into what controls the efficiency of iron fertilization in the ocean. Section IV on “model development” summarizes a set of papers describing the progress that we made on improving the ecosystem models we use for our iron fertilization simulations.« less

  8. Multispan Elevated Guideway Design for Passenger Transport Vehicles : Volume 2. Appendixes.

    DOT National Transportation Integrated Search

    1975-04-01

    Contents: Appendix A - derivation of vehicle-guideway interaction equations; Appendix B - evaluation of pier support dynamics; Appendix C - computer simulation program of two-dimensional vehicle over a multi-span guideway; Appendix D - computer progr...

  9. Emergency Victim Care. A Training Manual for Emergency Medical Technicians. Module 14. Appendix I: Communicating with Deaf and Hearing Impaired Patients. Appendix II: Medical Terminology. Appendix III: EMS Organizations. Appendix IV: Legislation (Ohio). Glossary of Terms. Index. Revised.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus. Div. of Vocational Education.

    This training manual for emergency medical technicians, one of 14 modules that comprise the Emergency Victim Care textbook, contains appendixes, a glossary, and an index. The first appendix is an article on communicating with deaf and hearing-impaired patients. Appendix 2, the largest section in this manual, is an introduction to medical…

  10. From Hard Times to Better Times: College Majors, Unemployment, and Earnings

    ERIC Educational Resources Information Center

    Carnevale, Anthony P.; Cheah, Ban

    2015-01-01

    This third installment of "Hard Times" updates the previous analyses of college majors, unemployment, and earnings over the Great Recession. While there is wide variation by college majors, hard times have become better times for most college graduates, but the recovery is far from complete. Hard times are becoming better times for most…

  11. New emission controls for Missouri batch-type charcoal kilns

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yronwode, P.; Graf, W.J.

    1999-07-01

    Charcoal kilns have been exempted from air emission regulation in the state of Missouri. Today, 80% of US charcoal production takes place in Missouri. As a result of a petition filed by people in the area around an installation in southern Missouri, the US Environmental Protection Agency (EPA) set up air monitors and measured ambient air levels at that charcoal manufacturing installation. These monitors yielded the highest particulate matter less than 10 micron (PM{sub 10}) levels ever recorded in the state. Earlier stack testing at another charcoal manufacturing installation indicated that toxics and carcinogens are present in charcoal kiln airmore » emissions. A Charcoal Kiln Workgroup was formed to determine the Best Available Control Technology (BACT) for charcoal kilns and to draft a charcoal kiln rule that requires BACT. The BACT report determined that afterburners were suitable for controlling emissions from batch-type charcoal kilns. In addition, the charcoal industry supported incorporating the BACT limits and requirements into an enforceable state rule and submitting this rule to the EPA for federal approval. A consent agreement between the EPA and three major charcoal companies was signed with provisions to install, operate, and maintain emission control devices on charcoal kilns. This agreement was to settle complaints alleging that the three major charcoal producers had failed to report toxic air emissions to federal and state regulators. The agreement provided that industry would install control devices on a set schedule with some charcoal kilns being shut down.« less

  12. 18 CFR Appendix A to Subpart H of... - Appendix A to Subpart H of Part 35

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Appendix A to Subpart H of Part 35 A Appendix A to Subpart H of Part 35 Conservation of Power and Water Resources FEDERAL... Rates Pt. 35, Subpt. H, App. A Appendix A to Subpart H of Part 35 Appendix A Standard Screen Format...

  13. SNS Central Helium Liquefier spare Carbon Bed installation and commissioning

    NASA Astrophysics Data System (ADS)

    DeGraff, B.; Howell, M.; Kim, S.; Neustadt, T.

    2017-12-01

    The Spallation Neutron Source (SNS) Central Helium Liquefier (CHL) at Oak Ridge National Laboratory (ORNL) has been without major operations downtime since operations were started back in 2006. This system utilizes a vessel filled with activated carbon as the final major component to remove oil vapor from the compressed helium circuit prior to insertion into the system’s cryogenic cold box. The need for a spare carbon bed at SNS due to the variability of carbon media lifetime calculation to adsorption efficiency will be discussed. The fabrication, installation and commissioning of this spare carbon vessel will be presented. The novel plan for connecting the spare carbon vessel piping to the existing infrastructure will be presented.

  14. STS-59 Space Shuttle mission report

    NASA Technical Reports Server (NTRS)

    Fricke, Robert W., Jr.

    1994-01-01

    The STS-59 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the sixty-second flight of the Space Shuttle Program and sixth flight of the Orbiter vehicle Endeavor (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET designated as ET-63; three SSME's which were designated as serial numbers 2028, 2033, and 2018 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-065. The RSRM's that were installed in each SRB were designated as 360W037A (welterweight) for the left SRB, and 360H037B (heavyweight) for the right SRB. This STS-59 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 8, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of the STS-59 mission was to successfully perform the operations of the Space Radar Laboratory-1 (SRL-1). The secondary objectives of this flight were to perform the operations of the Space Tissue Loss-A (STL-A) and STL-B payloads, the Visual Function Tester-4 (VFT-4) payload, the Shuttle Amateur Radio Experiment-2 (SAREX-2) experiment, the Consortium for Materials Development in Space Complex Autonomous Payload-4 (CONCAP-4), and the three Get-Away Special (GAS) payloads.

  15. STS-60 Space Shuttle mission report

    NASA Technical Reports Server (NTRS)

    Fricke, Robert W., Jr.

    1994-01-01

    The STS-60 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the sixtieth flight of the Space Shuttle Program and eighteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Orbiter, the flight vehicle consisted of an ET designated at ET-61 (Block 10); three SSME's which were designated as serial numbers 2012, 2034, and 2032 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-062. The RSRM's that were installed in each SRB were designated as 360L035A (lightweight) for the left SRB, and 360Q035B (quarterweight) for the right SRB. This STS-60 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume VIII, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objectives of the STS-60 mission were to deploy and retrieve the Wake Shield Facility-1 (WSF-1), and to activate the Spacehab-2 payload and perform on-orbit experiments. Secondary objectives of this flight were to activate and command the Capillary Pumped Loop/Orbital Debris Radar Calibration Spheres/Breman Satellite Experiment/Getaway Special (GAS) Bridge Assembly (CAPL/ODERACS/BREMSAT/GBA) payload, the Auroral Photography Experiment-B (APE-B), and the Shuttle Amateur Radio Experiment-II (SAREX-II).

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deline, Chris; Meydbray, Jenya; Donovan, Matt

    The 2012 NREL report 'Photovoltaic Shading Testbed for Module-Level Power Electronics' provides a standard methodology for estimating the performance benefit of distributed power electronics under partial shading conditions. Since the release of the report, experiments have been conducted for a number of products and for different system configurations. Drawing from these experiences, updates to the test and analysis methods are recommended. Proposed changes in data processing have the benefit of reducing the sensitivity to measurement errors and weather variability, as well as bringing the updated performance score in line with measured and simulated values of the shade recovery benefit ofmore » distributed PV power electronics. Also, due to the emergence of new technologies including sub-module embedded power electronics, the shading method has been extended to include power electronics that operate at a finer granularity than the module level. An update to the method is proposed to account for these emerging technologies that respond to shading differently than module-level devices. The partial shading test remains a repeatable test procedure that attempts to simulate shading situations as would be experienced by typical residential or commercial rooftop photovoltaic (PV) systems. Performance data for multiple products tested using this method are discussed, based on equipment from Enphase, Solar Edge, Maxim Integrated and SMA. In general, the annual recovery of shading losses from the module-level electronics evaluated is 25-35%, with the major difference between different trials being related to the number of parallel strings in the test installation rather than differences between the equipment tested. Appendix D data has been added in this update.« less

  17. NASA Safety Manual. Volume 3: System Safety

    NASA Technical Reports Server (NTRS)

    1970-01-01

    This Volume 3 of the NASA Safety Manual sets forth the basic elements and techniques for managing a system safety program and the technical methods recommended for use in developing a risk evaluation program that is oriented to the identification of hazards in aerospace hardware systems and the development of residual risk management information for the program manager that is based on the hazards identified. The methods and techniques described in this volume are in consonance with the requirements set forth in NHB 1700.1 (VI), Chapter 3. This volume and future volumes of the NASA Safety Manual shall not be rewritten, reprinted, or reproduced in any manner. Installation implementing procedures, if necessary, shall be inserted as page supplements in accordance with the provisions of Appendix A. No portion of this volume or future volumes of the NASA Safety Manual shall be invoked in contracts.

  18. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Air Force Plant 4, Fort Worth, Texas. Volume 3. Appendix A-1 (Continued).

    DTIC Science & Technology

    1987-12-01

    GAO 0 2L -4e- - Lq*Lio rol -4 1 IOU CI S W a G-v a. IV0 0 J= C. Ic LG 4sa C...8217 ’ ~ -i CIj -43j ~LU . l co r I_- z3 335 0- C= cu w- CDP aIC. *I lr_ - CkIJ LA-. n= C G C=> gao ’ GeL) =31 CAEl = C- C-10. LLaJ 1= w CL -* I t CI or SLLJ...6- Z u - a a qcrLLJ < nC Liu~ LI i LL.J CL. w <r LL <r 03 440 -x C= cn z4 -. - XM Z~ A ~ ’’ ~ "~’ , 4 *.\\~.S~4’N’~~’ - Iz JINI 1 *~ I- LLW W, a,

  19. Low-speed stability and control characteristics of a transport model with aft-fuselage-mounted advanced turboprops

    NASA Technical Reports Server (NTRS)

    Applin, Z. T.; Coe, P. L., Jr.

    1986-01-01

    A limited experimental investigation was conducted in the Langley 4- by 7-Meter Tunnel to explore the effects of aft-fuselage-mounted advanced turboprop installations on the low-speed stability and control characteristics of a representative transport aircraft in a landing configuration. In general, the experimental results indicate that the longitudinal and lateral-directional stability characteristics for the aft-fuselage-mounted single-rotation tractor and counter-rotation pusher propeller configurations tested during this investigation are acceptable aerodynamically. For the single-rotation tractor configuration, the propeller-induced aerodynamics are significantly influenced by the interaction of the propeller slipstream with the pylon and nacelle. The stability characteristics for the counter-rotation pusher configuration are strongly influenced by propeller normal forces. The longitudinal and directional control effectiveness, engine-out characteristics, and ground effects are also presented. In addition, a tabulated presentation of all aerodynamic data presented in this report is included as an appendix.

  20. Program design for incentivizing ignition interlock installation for alcohol-impaired drivers: The Ontario approach.

    PubMed

    Ma, Tracey; Byrne, Patrick A; Bhatti, Junaid A; Elzohairy, Yoassry

    2016-10-01

    Drinking and driving is a major risk factor for traffic injuries. Although ignition interlocks reduce drinking and driving while installed, several issues undermine their implementation including delayed eligibility for installation, low installation once eligible, and a return to previous risk levels after de-installation. The Canadian province of Ontario introduced a "Reduced Suspension with Ignition Interlock Conduct Review" Program, significantly changing pre-existing interlock policy. The Program incentivizes interlock installation and an "early" guilty plea. It also attempts to reduce long-term recidivism through behavioural feedback and compliance-based removal. This evaluation is the first in assessing Program impact. Ontario drivers with a first time alcohol-impaired driving conviction between July 1, 2005 and November 25, 2014 comprised the study cohort. Longitudinal analyses, using interrupted time series and Cox regression, were conducted in which exposure was the Program and the outcomes were ignition interlock installation (N=30,200), pre-trial elapsed time (N=30,200), and post-interlock recidivism (N=9326). After Program implementation, installation rates increased by 54% and pre-trial elapsed time decreased by 146 days. Results suggest no effect on post-interlock recidivism. Through an incentive-based design, this Program was effective at addressing two commonly cited barriers to interlock implementation- delayed eligibility for installation and low installation once eligible. Results reveal that installation rates are responsive not only to incentivization but also to other external factors, thus presenting an opportunity for policy makers to find unique ways to influence interlock uptake, and thereby, to extend their deterrent effects to a larger subset of the population. This study is one of the few that do not rely on proxy measures of installation rate. Copyright © 2016 Crown. Published by Elsevier Ltd.. All rights reserved.

  1. Selectable Optical Diagnostics Instrument Experiment Diffusion Coefficient Mixture-3 (SODI) DCMix-3 Installation

    NASA Image and Video Library

    2016-09-13

    NASA astronaut Kate Rubins works on Selectable Optical Diagnostics Instrument Experiment Diffusion Coefficient Mixture-3 (SODI) DCMix-3 Installation inside the station’s Microgravity Science Glovebox. The glovebox is one of the major dedicated science facilities inside the Destiny laboratory and provides a sealed environment for conducting science and technology experiments. The glovebox is particularly suited for handling hazardous materials when the crew is present.

  2. A hydroponic design for microgravity and gravity installations

    NASA Technical Reports Server (NTRS)

    Fielder, Judith; Leggett, Nickolaus

    1990-01-01

    A hydroponic system is presented that is designed for use in microgravity or gravity experiments. The system uses a sponge-like growing medium installed in tubular modules. The modules contain the plant roots and manage the flow of the nutrient solution. The physical design and materials considerations are discussed, as are modifications of the basic design for use in microgravity or gravity experiments. The major external environmental requirements are also presented.

  3. Voyager electronic parts radiation program. Volume 2: Test requirements and procedures

    NASA Technical Reports Server (NTRS)

    Stanley, A. G.; Martin, K. E.; Price, W. E.

    1978-01-01

    Documents are presented outlining the conditions and requirements of the test program. The Appendixes are as follows: appendix A -- Electron Simulation Radiation Test Specification for Voyager Electronic Parts and Devices, appendix B -- Electronic Piece-Part Testing Program for Voyager, appendix C -- Test Procedure for Radiation Screening of Voyager Piece Parts, appendix D -- Boeing In Situ Test Fixture, and appendix E -- Irradiate - Anneal (IRAN) Screening Documents.

  4. Complementary and Alternative Medicine in the Military Health System: Appendixes

    DTIC Science & Technology

    2017-01-01

    report. Appendixes F through H supply other supplementary material. Appendixes F and G contain the CAM survey instrument and a glossary of CAM services...respectively. Appendix H contains tables of detailed results from the CAM survey and the MHS administrative data analyses. Individual tables in...this appendix are referenced in Chapters Three through Seven of the main report. 2 Table of Contents Appendix F: CAM Survey Instrument

  5. RAMONA-4B a computer code with three-dimensional neutron kinetics for BWR and SBWR system transient - user`s manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rohatgi, U.S.; Cheng, H.S.; Khan, H.J.

    This document is the User`s Manual for the Boiling Water Reactor (BWR), and Simplified Boiling Water Reactor (SBWR) systems transient code RAMONA-4B. The code uses a three-dimensional neutron-kinetics model coupled with a multichannel, nonequilibrium, drift-flux, phase-flow model of the thermal hydraulics of the reactor vessel. The code is designed to analyze a wide spectrum of BWR core and system transients. Chapter 1 gives an overview of the code`s capabilities and limitations; Chapter 2 describes the code`s structure, lists major subroutines, and discusses the computer requirements. Chapter 3 is on code, auxillary codes, and instructions for running RAMONA-4B on Sun SPARCmore » and IBM Workstations. Chapter 4 contains component descriptions and detailed card-by-card input instructions. Chapter 5 provides samples of the tabulated output for the steady-state and transient calculations and discusses the plotting procedures for the steady-state and transient calculations. Three appendices contain important user and programmer information: lists of plot variables (Appendix A) listings of input deck for sample problem (Appendix B), and a description of the plotting program PAD (Appendix C). 24 refs., 18 figs., 11 tabs.« less

  6. DebriSat Hypervelocity Impact Test

    DTIC Science & Technology

    2015-08-01

    material. The foam was also color coded to assist in determining the location of various loose foam pieces found posttest . Details on the layer... pretest and posttest shots. AEDC-TR-15-S-2 23 Statement A: Approved by public release; distribution unlimited. APPENDIX B. SOFT CATCH FOAM CONFIGURATION ...spacecraft. One of the major hazards is hypervelocity impacts from uncontrolled, man-made space debris. Arnold Engineering Development Complex

  7. Review of Army Analysis. Volume 2. Appendixes C-M

    DTIC Science & Technology

    1979-04-01

    In most Army studies, the identifica-tion of new or changed alternatives occurs during the study de - spite efforts at early deflnition, Study...in time to support each major acquisition de -V..i cision milestone, Operational testing activities are similiarly timed, Thus, it frequently occurs...Engineer School i. Transportation School J. Quarter Master School k. Missile & Munition School 1. Intelligence School ! m. Signal School ii. Military

  8. 17 CFR 240.15c3-1a - Options (Appendix A to 17 CFR 240.15c3-1).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Regulations Under the Securities Exchange Act of 1934 Rules Relating to Over-The-Counter Markets § 240.15c3-1a... and down) in the current market value of the underlying instrument equal to the percentage... life of the option; and (6) The current term structure of interest rates. (C) The term major market...

  9. 17 CFR 240.15c3-1a - Options (Appendix A to 17 CFR 240.15c3-1).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Regulations Under the Securities Exchange Act of 1934 Rules Relating to Over-The-Counter Markets § 240.15c3-1a... from an assumed movement (both up and down) in the current market value of the underlying instrument...) The term major market foreign currency shall mean the currency of a sovereign nation whose short-term...

  10. 17 CFR 240.15c3-1a - Options (Appendix A to 17 CFR 240.15c3-1).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Regulations Under the Securities Exchange Act of 1934 Rules Relating to Over-The-Counter Markets § 240.15c3-1a... and down) in the current market value of the underlying instrument equal to the percentage... life of the option; and (6) The current term structure of interest rates. (C) The term major market...

  11. 17 CFR 240.15c3-1a - Options (Appendix A to 17 CFR 240.15c3-1).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Regulations Under the Securities Exchange Act of 1934 Rules Relating to Over-The-Counter Markets § 240.15c3-1a... and down) in the current market value of the underlying instrument equal to the percentage... life of the option; and (6) The current term structure of interest rates. (C) The term major market...

  12. 7 CFR Appendix B to Part 3015 - OMB Circular A-128, “Audits of State and Local Governments”

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of issuance. David A. Stockman, Director. Definition of Major Program as Provided in Pub. L. 98-502.... Purpose. This Circular is issued pursuant to the Single Audit Act of 1984, Pub. L. 98-502. It establishes... Program, as defined by Pub. L 98-502, is described in the Attachment to this Circular. k. Public...

  13. 7 CFR Appendix B to Part 3015 - OMB Circular A-128, “Audits of State and Local Governments”

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of issuance. David A. Stockman, Director. Definition of Major Program as Provided in Pub. L. 98-502.... Purpose. This Circular is issued pursuant to the Single Audit Act of 1984, Pub. L. 98-502. It establishes... Program, as defined by Pub. L 98-502, is described in the Attachment to this Circular. k. Public...

  14. Method for VAWT Placement on a Complex Building Structure

    DTIC Science & Technology

    2013-06-01

    85 APPENDIX C: ANSYS CFX SPECIFICAITONS FOR WIND FLOW ANALYSIS .....87 APPENDIX D: SINGLE ROTOR ANALYSIS ANSYS CFX MESH DETAILS...89 APPENDIX E: SINGLE ROTOR ANALYSIS, ANSYS CFX SPECIFICS .....................91 APPENDIX F: DETAILED RESULTS OF SINGLE ROTOR...101 APPENDIX I: DUAL ROTOR ANALYSIS- ANSYS CFX SPECIFICATIONS (6 BLADED VAWTS

  15. 40 CFR Appendix B to Part 66 - Instruction Manual

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Instruction Manual B Appendix B to...) ASSESSMENT AND COLLECTION OF NONCOMPLIANCE PENALTIES BY EPA Pt. 66, App. B Appendix B to Part 66—Instruction Manual Note: For text of appendix B see appendix B to part 67. ...

  16. Comparative Roles of Overexpressed and Mutated H- and K-ras in Mammary Carcinogenesis.

    DTIC Science & Technology

    1996-08-01

    transgene of these tumors. 14. SUBJECT TERMS 15. NUMBER OF PAGES Breast Cancer , mammary carcinogenesis, oncogenes, ras genes, 44 replication defective...27 Appendix 5 29 Appendix 6 31 Appendix 7 33 Appendix 8 35 Appendix 9 37 Appendix 10 39 Introduction Breast cancer development involves multiple poorly...understood steps (25). Currently, several genes that may participate in breast cancer development are under investigation. The ras family of genes

  17. US Department of Energy Nevada Operations Office annual site environmental report: 1993. Volume 2: Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, S.C.; Glines, W.M.; Townsend, Y.E.

    1994-09-01

    This report is comprised of appendices which support monitoring and surveillance on and around the Nevada Test Site (NTS) during 1993. Appendix A contains onsite Pu-238, gross beta, and gamma-emitting radionuclides in air. Appendix B contains onsite tritium in air. Appendix C contains onsite Pu-238, Sr-90, gross alpha and beta, gamma-emitting radionuclides, Ra-226, Ra-228 and tritium in water. A summary of 1993 results of offsite radiological monitoring is included in Appendix D. Appendix E contains radioactive noble gases in air onsite. Appendix F contains onsite thermoluminescent dosimeter data. Historical trends in onsite thermoluminescent dosimeter data are contained in Appendix G.more » Appendix H summarizes 1993 compliance at the DOE/NV NTS and non-NTS facilities. Appendix I summarizes the 1993 results of non radiological monitoring.« less

  18. Statistical Mechanics and Applications in Condensed Matter

    NASA Astrophysics Data System (ADS)

    Di Castro, Carlo; Raimondi, Roberto

    2015-08-01

    Preface; 1. Thermodynamics: a brief overview; 2. Kinetics; 3. From Boltzmann to Gibbs; 4. More ensembles; 5. The thermodynamic limit and its thermodynamic stability; 6. Density matrix and quantum statistical mechanics; 7. The quantum gases; 8. Mean-field theories and critical phenomena; 9. Second quantization and Hartree-Fock approximation; 10. Linear response and fluctuation-dissipation theorem in quantum systems: equilibrium and small deviations; 11. Brownian motion and transport in disordered systems; 12. Fermi liquids; 13. The Landau theory of the second order phase transitions; 14. The Landau-Wilson model for critical phenomena; 15. Superfluidity and superconductivity; 16. The scaling theory; 17. The renormalization group approach; 18. Thermal Green functions; 19. The microscopic foundations of Fermi liquids; 20. The Luttinger liquid; 21. Quantum interference effects in disordered electron systems; Appendix A. The central limit theorem; Appendix B. Some useful properties of the Euler Gamma function; Appendix C. Proof of the second theorem of Yang and Lee; Appendix D. The most probable distribution for the quantum gases; Appendix E. Fermi-Dirac and Bose-Einstein integrals; Appendix F. The Fermi gas in a uniform magnetic field: Landau diamagnetism; Appendix G. Ising and gas-lattice models; Appendix H. Sum over discrete Matsubara frequencies; Appendix I. Hydrodynamics of the two-fluid model of superfluidity; Appendix J. The Cooper problem in the theory of superconductivity; Appendix K. Superconductive fluctuations phenomena; Appendix L. Diagrammatic aspects of the exact solution of the Tomonaga Luttinger model; Appendix M. Details on the theory of the disordered Fermi liquid; References; Author index; Index.

  19. Analysis of the Impact of ’People Programs’ Upon Retention of Enlisted Personnel in the Air Force. Appendices K, L, N.

    DTIC Science & Technology

    1982-06-09

    32 V. An Econometric Model of Retention 71 Bibliography 166 Appendix A Appendix B Volume II Appendix C Appendix D Appendix E Volume III Appendix F...RETENTION OF ENLISTED PE.(U R O0URC RE SE ARCH CORP NH L LEG E ST AIT ION TO 09 jN 82 F4698 _H 8 -0063 NCASFEEEFhEE 5/9 hE EhsohEohmhhhhEE

  20. 40 CFR Appendix C to Part 66 - Computer Program

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Computer Program C Appendix C to Part...) ASSESSMENT AND COLLECTION OF NONCOMPLIANCE PENALTIES BY EPA Pt. 66, App. C Appendix C to Part 66—Computer Program Note: For text of appendix C see appendix C to part 67. ...

Top