Sample records for management final technical

  1. Develop a Comprehensive Technical Training and Data Collection Program for Structural Welders and Fitters: Technical Proposal

    DTIC Science & Technology

    2006-05-30

    implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails

  2. Vocational Curriculum Modification. Teaching Technical Language to Learning Handicapped Students. Project HIRE: A Curriculum Management System for Instructing the Handicapped. Final Report, Volume 1.

    ERIC Educational Resources Information Center

    Gardner, David C.; And Others

    Volume 1 of the final report on Project HIRE reports the design, development, field-testing, and refining of self-instructional packages to teach entry level technical vocabulary to learning handicapped students mainstreamed in vocational programs. Volume 2, a management handbook, reports the methods and findings concerning development of…

  3. Final priority; Technical Assistance on State Data Collection--IDEA Data Management Center. Final priority.

    PubMed

    2014-08-05

    The Assistant Secretary for the Office of Special Education and Rehabilitative Services (OSERS) announces a priority under the Technical Assistance on State Data Collection program. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2014 and later years. We take this action to fund a cooperative agreement to establish and operate an IDEA Data Management Center (Center) that will provide technical assistance (TA) to improve the capacity of States to meet the data collection requirements of the Individuals with Disabilities Education Act (IDEA).

  4. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  5. Hazardous Waste Management System - Identification and Listing of Hazardous Waste - Recycled Used Oil Management Standards - Federal Register Notice, May 3, 1993

    EPA Pesticide Factsheets

    This action corrects several technical errors and provides clarifying amendments to the final recycled used oil management standards rule. The final rule was published on September 10, 1992 (57 FR 41566).

  6. 75 FR 6839 - Technical Service Provider Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-12

    ... Executive Order 12866, the Office of Management and Budget determined that this final rule is not a... or are eligible to participate in conservation programs to help them make land management decisions...: Covered Programs. The interim final rule incorporated reference to the Agricultural Management Assistance...

  7. Research in network management techniques for tactical data communications networks

    NASA Astrophysics Data System (ADS)

    Boorstyn, R.; Kershenbaum, A.; Maglaris, B.; Sarachik, P.

    1982-09-01

    This is the final technical report for work performed on network management techniques for tactical data networks. It includes all technical papers that have been published during the control period. Research areas include Packet Network modelling, adaptive network routing, network design algorithms, network design techniques, and local area networks.

  8. The Vocational Education Component of the Rhode Island Educational Management Information System.

    ERIC Educational Resources Information Center

    Galamaga, Donald P.; Bartolomeo, Paul A.

    The document describes the implementation (Phase Two) of the Vocational Educational module--one component of an educational management information system. Phase Two entails the technical effort of final system design, final output specifications, edit specifications, system software selection, computer programing, systems documentation and the…

  9. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  10. Forecasting the Future Food Service World of Work. Final Report. Volume III. Technical Papers on the Future of the Food Service Industry. Service Management Reports.

    ERIC Educational Resources Information Center

    Powers, Thomas F., Ed.; Swinton, John R., Ed.

    This third and final volume of a study on the future of the food service industry contains the technical papers on which the information in the previous two volumes was based. The papers were written by various members of the Pennsylvania State University departments of economics, food science, nutrition, social psychology, and engineering and by…

  11. Prototype development and demonstration for response, emergency staging, communications, uniform management, and evacuation (R.E.S.C.U.M.E.) : technical report on prototype development and field testing of R.E.S.C.U.M.E. applications.

    DOT National Transportation Integrated Search

    2015-04-01

    This document is the final project technical report for the development and field testing of the Response, Emergency Staging, Communications, Uniform Management, and Evacuation (R.E.S.C.U.M.E.) application bundle, with a focus on the Incident Zone (I...

  12. An SNMP-based solution to enable remote ISO/IEEE 11073 technical management.

    PubMed

    Lasierra, Nelia; Alesanco, Alvaro; García, José

    2012-07-01

    This paper presents the design and implementation of an architecture based on the integration of simple network management protocol version 3 (SNMPv3) and the standard ISO/IEEE 11073 (X73) to manage technical information in home-based telemonitoring scenarios. This architecture includes the development of an SNMPv3-proxyX73 agent which comprises a management information base (MIB) module adapted to X73. In the proposed scenario, medical devices (MDs) send information to a concentrator device [designated as compute engine (CE)] using the X73 standard. This information together with extra information collected in the CE is stored in the developed MIB. Finally, the information collected is available for remote access via SNMP connection. Moreover, alarms and events can be configured by an external manager in order to provide warnings of irregularities in the MDs' technical performance evaluation. This proposed SNMPv3 agent provides a solution to integrate and unify technical device management in home-based telemonitoring scenarios fully adapted to X73.

  13. A Pilot Program to Provide Ownership Skills to Seniors in the Vocational Technical Schools and Other Educational Institutions, Year Two. Final Report.

    ERIC Educational Resources Information Center

    Norwich Regional Vocational Technical School, CT.

    Responding to a Small Business Administration statement that technical school graduates lack knowledge of business principles, the Norwich (Connecticut) Regional Vocational Technical School conducted a course in small business ownership/management for all of its seniors. The required course, a fifty-four-hour module, replaced one English,…

  14. 75 FR 51373 - Withholding of District of Columbia, State, City and County Income or Employment Taxes by Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ...: Financial Management Service, Fiscal Service, Treasury. ACTION: Technical amendment. SUMMARY: This document... addressing the request to: Assistant Commissioner, Payment Management, Financial Management Service... Management, as the recipient of the letters. II. Need for Correction As published, the final regulations...

  15. Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments - Interim Final

    EPA Pesticide Factsheets

    This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.

  16. NetView technical research

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This is the Final Technical Report for the NetView Technical Research task. This report is prepared in accordance with Contract Data Requirements List (CDRL) item A002. NetView assistance was provided and details are presented under the following headings: NetView Management Systems (NMS) project tasks; WBAFB IBM 3090; WPAFB AMDAHL; WPAFB IBM 3084; Hill AFB; McClellan AFB AMDAHL; McClellan AFB IBM 3090; and Warner-Robins AFB.

  17. Ontologies, Knowledge Bases and Knowledge Management

    DTIC Science & Technology

    2002-07-01

    AFRL-IF-RS-TR-2002-163 Final Technical Report July 2002 ONTOLOGIES, KNOWLEDGE BASES AND KNOWLEDGE MANAGEMENT USC Information ...and layer additional information necessary to make specific uses of the knowledge in this core. Finally, while we were able to find adequate solutions... knowledge base and inference engine. Figure 3.2: SDA Editor Interface 46 Although the SDA has access to information about the situation, we wanted the user

  18. Solar Systems and Energy Management Controls. Final Report, 1982-83.

    ERIC Educational Resources Information Center

    Bergen County Vocational-Technical High School, Hackensack, NJ.

    This project was conducted by the Bergen County Vocational-Technical Schools (1) to develop a practical awareness of energy conservation and management techniques for both commercial and domestic applications; (2) to develop four training courses to teach solar troubleshooting and maintenance, commercial energy management control, domestic energy…

  19. System Maturity and Architecture Assessment Methods, Processes, and Tools

    DTIC Science & Technology

    2012-03-02

    Deshmukh , and M. Sarfaraz. Development of Systems Engineering Maturity Models and Management Tools. Systems Engineering Research Center Final Technical...Ramirez- Marquez, D. Nowicki, A. Deshmukh , and M. Sarfaraz. Development of Systems Engineering Maturity Models and Management Tools. Systems Engineering

  20. Surgical Practical Skills Learning Curriculum: Implementation and Interns' Confidence Perceptions.

    PubMed

    Acosta, Danilo; Castillo-Angeles, Manuel; Garces-Descovich, Alejandro; Watkins, Ammara A; Gupta, Alok; Critchlow, Jonathan F; Kent, Tara S

    To provide an overview of the practical skills learning curriculum and assess its effects over time on the surgical interns' perceptions of their technical skills, patient management, administrative tasks, and knowledge. An 84-hour practical skills curriculum composed of didactic, simulation, and practical sessions was implemented during the 2015 to 2016 academic year for general surgery interns. Totally, 40% of the sessions were held during orientation, whereas the remainder sessions were held throughout the academic year. Interns' perceptions of their technical skills, administrative tasks, patient management, and knowledge were assessed by the practical skills curriculum residents' perception survey at various time points during their intern year (baseline, midpoint, and final). Interns were also asked to fill out an evaluation survey at the completion of each session to obtain feedback on the curriculum. General Surgery Residency program at a tertiary care academic institution. 20 General Surgery categorical and preliminary interns. Significant differences were found over time in interns' perceptions on their technical skills, patient management, administrative tasks, and knowledge (p < 0.001 for all). The results were also statistically significant when accounting for a prior boot camp course in medical school, intern status (categorical or preliminary), and gender (p < 0.05 for all). Differences in interns' perceptions occurred both from baseline to midpoint, and from midpoint to final time point evaluations (p < 0.001 for all). Prior surgical boot camp in medical school status, intern status (categorical vs. preliminary), and gender did not differ in the interns' baseline perceptions of their technical skills, patient management, administrative tasks, and knowledge (p > 0.05 for all). Implementation of a Practical Skills Curriculum in surgical internships can improve interns' confidence perception on their technical skills, patient management skills, administrative tasks, and knowledge. Copyright © 2018. Published by Elsevier Inc.

  1. 75 FR 37722 - OMB Approvals Under the Paperwork Reduction Act; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... since its last update. B. Why is this Technical Amendment Issued as a Final Rule? The information... provisions since the last update of this table. The paperwork burden associated with these new provisions was... amendment updates the table that lists the Office of Management and Budget (OMB) control numbers issued...

  2. Final recovery plan of the southwestern willow flycatcher (Empidonax traillii extimus)

    Treesearch

    Deborah M. Finch; Stephen I. Rothstein; Jon C. Boren; William L. Graf; Jerry L. Holechek; Barbara E. Kus; Robert M. Marshall; Molly M. Pohl; Susan J. Sferra; Mark K. Sogge; Julie C. Stromberg; Bradley A. Valentine; Mary J. Whitfield; Sartor O. Williams

    2002-01-01

    The Southwestern Willow Flycatcher Recovery Team is composed of a Technical Subgroup (pg. ii), six Implementation Subgroups (Appendix A), and a Tribal Working Group. The Technical Subgroup consists of 14 academic scientists, researchers, and resource managers with a wide range of expertise in avian biology and ecology, southwestern willow flycatcher ecology, cowbird...

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tagestad, Jerry D.; Bolte, John; Guzy, Michael

    During this final year of the Pacific Northwest Regional Collaboratory we focused significantly on continuing the relationship between technical teams and government end-users. The main theme of the year was integration. This took the form of data integration via our web portal and integration of our technologies with the end users. The PNWRC's technical portfolio is based on EOS strategies, and focuses on 'applications of national priority: water management, invasive species, coastal management and ecological forecasting.' The products of our technical approaches have been well received by the community of focused end-users. The objective this year was to broaden thatmore » community and develop external support to continue and operationalize product development.« less

  4. Illinois Clean Coal Institute 2005 annual report. Final technical report for the period September 1st, 2004, through August 31, 2005 on projects funded by the Illinois Department of Commerce and Economic Opportunity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2005-11-08

    This final technical report contains the abstracts and executive summaries of projects funded through the Illinois Clean Coal Institute solicitation entitled 'Request for proposals No. 04-1(ICCI/RFP04-1)'. Support of these projects is by the Office of Coal Development and Department of Commerce and Economic Opportunity. The projects fall into the following categories: advanced coal mining technologies; coal preparation and coal production business practice; management of coal combustion byproducts; commercialization and technology transfer. Final project extensions are also recorded.

  5. 75 FR 1839 - Departmental Offices; Debt Management Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of..., financing estimates and technical charts. This briefing will give the press an opportunity to ask questions...

  6. People Management. Final Report of the People Management Committee

    DTIC Science & Technology

    1975-04-25

    Objective Memorandum Planning, Programming, C Budgeting System Personnel Priority Model Projected Requisitioning Authority Prior ServIce Quality ...April 1975 PREPARED FOR - G THE DEPARTMENT OF ARMY OFFICE OF THE DEPUTY CHIEF OF STAFF FOR PERSONNEL NATIONAL TECHNICAL INFORMATION SERVICE US... service accessions and reenllstees. (3) Manage the DEP. (4) Bolster systems discipline. d. RecommendetIons; (1) That manpower objectives

  7. Advanced Transportation System Studies Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development Contract. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The purpose of the Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is Volume 2 of the final report for the contract. It provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessments performed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 contract presentations, a copy of the FLO launch vehicle final report, and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian main propulsion technologies.

  8. A Study of Placing Army Requirements on Contract

    DTIC Science & Technology

    2016-04-01

    perhaps being unable to control the external environment, has management authority over business and technical aspects of a specific program. The PM...research is the last element of the planning phase addressing both business and technical considerations. The acquisition team equips themselves with...report is the final product utilizing documented findings and supports the business strategy (DoD, Guidebook for the Acquisition of Services, 2011

  9. 6 Keys to Identity Management

    ERIC Educational Resources Information Center

    Shoham, Idan

    2011-01-01

    An Identity and Access Management (IAM) project on campus can feel like a Sisyphean task: Just when access rights have finally been sorted out, the semester ends--and users change roles, leave campus, or require new processes. IT departments face a constantly changing technical landscape: (1) integrating new applications and retiring old ones; (2)…

  10. Validation of Technical Recommendations. Final Report. ISSOE Managing Student Progress.

    ERIC Educational Resources Information Center

    Ridley, Dennis; And Others

    This report is organized to provide a complete, logical presentation of the major steps taken in the third phase of research on dynamics of dissemination of the Instructional Support System for Occupational Education (ISSOE). It reports on the confirmation and validation of the Phase II Final Report on Dissemination Issues and the Phase III…

  11. Mariano Lake Mine: Technical Reports

    EPA Pesticide Factsheets

    This Final Removal Site Evaluation describes the objectives, work performed, and results of a Removal Site Evaluation (RSE) at the Mariano Lake Mine, which was performed by ARCADIS U.S., Inc. on behalf of Chevron Environmental Management Company.

  12. Computers, Modeling and Management Education. Technical Report No. 6.

    ERIC Educational Resources Information Center

    Bonini, Charles P.

    The report begins with a brief examination of the role of computer modeling in management decision-making. Then, some of the difficulties of implementing computer modeling are examined, and finally, the educational implications of these issues are raised, and a comparison is made between what is currently being done and what might be done to…

  13. [Hospital management in Brazil: a review of the literature with a view toenhance administrative practices in hospitals].

    PubMed

    Farias, Diego Carlos; Araujo, Fernando Oliveira de

    2017-06-01

    Hospitals are complex organizations which, in addition to the technical assistance expected in the context of treatment and prevention of health hazards, also require good management practices aimed at improving their efficiency in their core business. However, in administrative terms, recurrent conflicts arise involving technical and managerial areas. Thus, this article sets out to conducta review of the scientific literature pertaining to the themes of hospital management and projects that have been applied in the hospital context. In terms of methodology, the study adopts the webiblioming method of collection and systematic analysis of knowledge in indexed journal databases. The results show a greater interest on the part of researchers in looking for a more vertically and horizontally dialogical administration, better definition of work processes, innovative technological tools to support the management process and finally the possibility of applying project management methodologies in collaboration with hospital management.

  14. Architecture survey analysis by CSA initiative : volume I final report

    DOT National Transportation Integrated Search

    1993-07-01

    Many organizations in industry and government, face challenges in information management similar to the Federal Aviation Administration (FAA). The objective of the Architecture Survey is to enable the FAA to build upon the experience and technical co...

  15. Architecture survey analysis by organization : volume II final report

    DOT National Transportation Integrated Search

    1993-07-01

    Many organizations in industry and government, face challenges in information management similar to the Federal Aviation Administration (FAA). The objective of the Architecture Survey is to enable the FAA to build upon the experience and technical co...

  16. Technical area status report for waste destruction and stabilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dalton, J.D.; Harris, T.L.; DeWitt, L.M.

    1993-08-01

    The Office of Environmental Restoration and Waste Management (EM) was established by the Department of Energy (DOE) to direct and coordinate waste management and site remediation programs/activities throughout the DOE complex. In order to successfully achieve the goal of properly managing waste and the cleanup of the DOE sites, the EM was divided into five organizations: the Office of Planning and Resource Management (EM-10); the Office of Environmental Quality Assurance and Resource Management (EM-20); the Office of Waste Operations (EM-30); the Office of Environmental Restoration (EM-40); and the Office of Technology and Development (EM-50). The mission of the Office ofmore » Technology Development (OTD) is to develop treatment technologies for DOE`s operational and environmental restoration wastes where current treatment technologies are inadequate or not available. The Mixed Waste Integrated Program (MWIP) was created by OTD to assist in the development of treatment technologies for the DOE mixed low-level wastes (MLLW). The MWIP has established five Technical Support Groups (TSGs) whose purpose is to identify, evaluate, and develop treatment technologies within five general technical areas representing waste treatment functions from initial waste handling through generation of final waste forms. These TSGs are: (1) Front-End Waste Handling, (2) Physical/Chemical Treatment, (3) Waste Destruction and Stabilization, (4) Second-Stage Destruction and Offgas Treatment, and (5) Final Waste Forms. This report describes the functions of the Waste Destruction and Stabilization (WDS) group. Specifically, the following items are discussed: DOE waste stream identification; summary of previous efforts; summary of WDS treatment technologies; currently funded WDS activities; and recommendations for future activities.« less

  17. Coalition Battle Management Language (C-BML) (Language de gestion du champ de bataille (C-BML)

    DTIC Science & Technology

    2012-02-01

    de gestion du champ de bataille (C-BML)) NMSG-048 Final Report. This document...BML) (Langage de gestion du champ de bataille (C-BML)) NMSG-048 Final Report. This document contains information authorized by NATO RTA for...Technical Readiness Level (TRL) that is consistent with an operational deployment. ES - 2 RTO-TR-MSG-048 Langage de gestion du champ de

  18. Thermally Optimized Paradigm of Thermal Management (TOP-M)

    DTIC Science & Technology

    2017-07-18

    ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8...19b. TELEPHONE NUMBER (Include area code) 18-07-2017 Final Technical Jul 2015 - Jul 2017 NICOP - Thermally Optimized Paradigm of Thermal Management ...The main goal of this research was to present a New Thermal Management Approach, which combines thermally aware Very/Ultra Large Scale Integration

  19. Real-Time Network Management

    DTIC Science & Technology

    1998-07-01

    Report No. WH97JR00-A002 Sponsored by REAL-TIME NETWORK MANAGEMENT FINAL TECHNICAL REPORT K CD July 1998 CO CO O W O Defense Advanced...Approved for public release; distribution unlimited. t^GquALmmsPEami Report No. WH97JR00-A002 REAL-TIME NETWORK MANAGEMENT Synectics Corporation...2.1.2.1 WAN-class Networks 12 2.1.2.2 IEEE 802.3-class Networks 13 2.2 Task 2 - Object Modeling for Architecture 14 2.2.1 Managed Objects 14 2.2.2

  20. Evaluation of conventional power systems. [emphasizing fossil fuels and nuclear energy

    NASA Technical Reports Server (NTRS)

    Smith, K. R.; Weyant, J.; Holdren, J. P.

    1975-01-01

    The technical, economic, and environmental characteristics of (thermal, nonsolar) electric power plants are reviewed. The fuel cycle, from extraction of new fuel to final waste management, is included. Emphasis is placed on the fossil fuel and nuclear technologies.

  1. The Spanish General Radioactive Waste Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Espejo, J.M.; Abreu, A.

    This paper mainly describes the strategies, the necessary actions and the technical solutions to be developed by ENRESA in the short, medium and long term, aimed at ensuring the adequate management of radioactive waste, the dismantling and decommissioning of nuclear and radioactive facilities and other activities, including economic and financial measures required to carry them out. Starting with the Spanish administrative organization in this field, which identifies the different agents involved and their roles, and after referring to the waste generation, the activities to be performed in the areas of LILW, SF and HLW management, decommissioning of installations and othersmore » are summarized. Finally, the future management costs are estimated and the financing system currently in force is explained. The so-called Sixth General Radioactive Waste Plan (6. GRWP), approved by the Spanish Government, is the 'master document' of reference where all the above mentioned issues are contemplated. In summary: The 6. GRWP includes the strategies and actions to be performed by Enresa in the coming years. The document, revised by the Government and subject to a process of public information, underlines the fact that Spain possesses an excellent infrastructure for the safe and efficient management of radioactive waste, from the administrative, technical and economic-financial points of view. From the administrative point of view there is an organisation, supported by ample legislative developments, that contemplates and governs the main responsibilities of the parties involved in the process (Government, CSN, ENRESA and waste producers). As regards the technical aspect, the experience accumulated to date by Enresa is particularly significant, as are the technologies now available in the field of management and for dismantling processes. As regards the economic-financial basis, a system is in place that guarantees the financing of radioactive waste management costs. This system is based on the generation of funds up front, during the operating lifetime of the facilities, through the application of fees established by Statutory provisions. Finally, a mandatory mechanism of annual revision for both technical issues and economic and financial aspects, allows to have updated all the courses of action. (authors)« less

  2. An Integrated Water Treatment Technology Solution for Sustainable Water Resource Management in the Marcellus Shale

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthew Bruff; Ned Godshall; Karen Evans

    2011-04-30

    This Final Scientific/ Technical Report submitted with respect to Project DE-FE0000833 titled 'An Integrated Water Treatment Technology Solution for Sustainable Water Resource Management in the Marcellus Shale' in support of final reporting requirements. This final report contains a compilation of previous reports with the most current data in order to produce one final complete document. The goal of this research was to provide an integrated approach aimed at addressing the increasing water resource challenges between natural gas production and other water stakeholders in shale gas basins. The objective was to demonstrate that the AltelaRain{reg_sign} technology could be successfully deployed inmore » the Marcellus Shale Basin to treat frac flow-back water. That objective has been successfully met.« less

  3. ACE: A distributed system to manage large data archives

    NASA Technical Reports Server (NTRS)

    Daily, Mike I.; Allen, Frank W.

    1993-01-01

    Competitive pressures in the oil and gas industry are requiring a much tighter integration of technical data into E and P business processes. The development of new systems to accommodate this business need must comprehend the significant numbers of large, complex data objects which the industry generates. The life cycle of the data objects is a four phase progression from data acquisition, to data processing, through data interpretation, and ending finally with data archival. In order to implement a cost effect system which provides an efficient conversion from data to information and allows effective use of this information, an organization must consider the technical data management requirements in all four phases. A set of technical issues which may differ in each phase must be addressed to insure an overall successful development strategy. The technical issues include standardized data formats and media for data acquisition, data management during processing, plus networks, applications software, and GUI's for interpretation of the processed data. Mass storage hardware and software is required to provide cost effective storage and retrieval during the latter three stages as well as long term archival. Mobil Oil Corporation's Exploration and Producing Technical Center (MEPTEC) has addressed the technical and cost issues of designing, building, and implementing an Advanced Computing Environment (ACE) to support the petroleum E and P function, which is critical to the corporation's continued success. Mobile views ACE as a cost effective solution which can give Mobile a competitive edge as well as a viable technical solution.

  4. An Analysis of the Balance of Management, Technical and Leadership Progression through the Three USAF Officer Tiers

    DTIC Science & Technology

    2007-03-01

    schools of thought on the relationship between management and leadership traits among successful CEO’s, Generals, politicians, entrepreneurs, etc… First...al. 2005:6). Finally, there is a school of thought that management and leadership are two distinct entities, but extremely successful people happen...doesn’t mean they can play basketball and a person having basketball skills doesn’t make them tall. However, the NBA is predominantly filled with

  5. California ATMS Testbed : PHASE III: Operational Research Implementation : Final Report [Volume 1: Executive Summary ; and, Volume II: Technical Report

    DOT National Transportation Integrated Search

    2006-10-01

    This report summarizes research and development that has been conducted to position the Testbed to support prototype deployment and evaluation of Advanced Transportation Management Systems (ATMS) products and services. The various elements contained ...

  6. TECHNICAL GUIDANCE DOCUMENT: INSPECTION TECHNIQUES FOR THE FABRICATION OF GEOMEMBRANE FIELD SEAMS

    EPA Science Inventory

    Subtitle C of the Resource Conservation and Recovery Act (RCRA) requires the U.S. Environmental Protection Agency (EPA) to establish a Federal hazardous waste management program. This program must ensure that hazardous wastes are handled safely from generation until final dispos...

  7. Human Factors Analysis of Pipeline Monitoring and Control Operations: Final Technical Report

    DOT National Transportation Integrated Search

    2008-11-26

    The purpose of the Human Factors Analysis of Pipeline Monitoring and Control Operations project was to develop procedures that could be used by liquid pipeline operators to assess and manage the human factors risks in their control rooms that may adv...

  8. Enhancement of the Probabilistic CEramic Matrix Composite ANalyzer (PCEMCAN) Computer Code

    NASA Technical Reports Server (NTRS)

    Shah, Ashwin

    2000-01-01

    This report represents a final technical report for Order No. C-78019-J entitled "Enhancement of the Probabilistic Ceramic Matrix Composite Analyzer (PCEMCAN) Computer Code." The scope of the enhancement relates to including the probabilistic evaluation of the D-Matrix terms in MAT2 and MAT9 material properties card (available in CEMCAN code) for the MSC/NASTRAN. Technical activities performed during the time period of June 1, 1999 through September 3, 1999 have been summarized, and the final version of the enhanced PCEMCAN code and revisions to the User's Manual is delivered along with. Discussions related to the performed activities were made to the NASA Project Manager during the performance period. The enhanced capabilities have been demonstrated using sample problems.

  9. Data management system DIU test system

    NASA Technical Reports Server (NTRS)

    1976-01-01

    An operational and functional description is given of the data management system. Descriptions are included for the test control unit, analog stimulus panel, discrete stimulus panel, and the precision source. The mechanical configuration is defined and illustrated to provide card and component location for modification or repair. The unit level interfaces are mirror images of the DIU interfaces and are described in the Final Technical Report for NASA-MSFC contract NAS8-29155.

  10. A report on participant sampling and recruitment for travel and physical activity data collection : final technical report, July 2009.

    DOT National Transportation Integrated Search

    2009-07-01

    The substantial investments now being made in transit yield benefits that go beyond managing traffic congestion relief, : and include improved environmental quality and potential gains in human health due to increased physical activity. Past : resear...

  11. Technical Update for Vocational Agriculture Teachers in Secondary Schools. Final Report.

    ERIC Educational Resources Information Center

    Iowa State Univ. of Science and Technology, Ames. Dept. of Agricultural Education.

    A project provided ongoing opportunities for teachers in Iowa to upgrade their expertise in agribusiness management using new technology; production, processing, and marketing agricultural products; biotechnology in agriculture; and conservation of natural resources. The project also modeled effective teaching methods and strategies. Project…

  12. Technical and Non-Technical Measures for air pollution emission reduction: The integrated assessment of the regional Air Quality Management Plans through the Italian national model

    NASA Astrophysics Data System (ADS)

    D'Elia, I.; Bencardino, M.; Ciancarella, L.; Contaldi, M.; Vialetto, G.

    2009-12-01

    The Italian Air Quality legislation underwent sweeping changes with the implementation of the 1996 European Air Quality Framework Directive when the Italian administrative Regions were entrusted with air quality management tasks. The most recent Regional Air Quality Management Plans (AQMPs) highlighted the importance of Non-Technical Measures (NTMs), in addition to Technical Measures (TMs), in meeting environmental targets. The aim of the present work is to compile a list of all the TMs and NTMs taken into account in the Italian Regional AQMPs and to give in the target year, 2010, an estimation of SO 2, NO x and PM 10 emission reductions, of PM 10 concentration and of the health impact of PM 2.5 concentrations in terms of Life Expectancy Reduction. In order to do that, RAINS-Italy, as part of the National Integrated Modeling system for International Negotiation on atmospheric pollution (MINNI), has been applied. The management of TMs and NTMs inside RAINS have often obliged both the introduction of exogenous driving force scenarios and the control strategy modification. This has inspired a revision of the many NTM definitions and a clear choice of the definition adopted. It was finally highlighted that only few TMs and NTMs implemented in the AQMPs represent effective measures in reaching the environmental targets.

  13. Hazardous Waste Management System - General - Identification and Listing of Hazardous Waste - Used Oil - Federal Register Notice, May 20, 1992

    EPA Pesticide Factsheets

    EPA is today promulgating a final listing decision for used oils based upon the technical criteria provided in the Resource Conservation and Recovery Act (RCRA) sections 1004 and 3001 and in 40 CFR 261.11 (a)(1) and (a)(3).

  14. The College Mathematics Experience and Changes in Majors: A Structural Model Analysis.

    ERIC Educational Resources Information Center

    Whiteley, Meredith A.; Fenske, Robert H.

    1990-01-01

    Testing of a structural equation model with college mathematics experience as the focal variable in 745 students' final decisions concerning major or dropping out over 4 years of college yielded separate model estimates for 3 fields: scientific/technical, quantitative business, and business management majors. (Author/MSE)

  15. 78 FR 79298 - Securities Exempted; Distribution of Shares by Registered Open-End Management Investment Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ... SECURITIES AND EXCHANGE COMMISSION 17 CFR Parts 230 and 270 [Release No. 33-9503; IC-30845...; Applications Regarding Joint Enterprises or Arrangements and Certain Profit-Sharing Plans AGENCY: Securities and Exchange Commission. ACTION: Final rule; technical amendments. SUMMARY: The Securities and...

  16. Passenger Transportation and Travel Curriculum Guide. Final Report.

    ERIC Educational Resources Information Center

    Lininger, Carol

    This curriculum guide provides materials for a course in passenger transportation and travel. The four-credit, competency-based program provides students with skills necessary to obtain employment in the aviation industry, travel agencies, hotel/motel management, and car rental agencies. An overview of vocational-technical education at the school…

  17. 1984 Directory of Experts on Organization and Management of Construction.

    DTIC Science & Technology

    1984-02-01

    Action & Services Expert on the Panal of: World Bank, Asian Development Bank, Commonwealth Fund for Technical Cooneration, U.N. Centre for Human...Hall, Inc., Englewood Cliffs, New Jersey, 1977 Nunnally, S. W., and R. F. DeBruhl, Final Report, North Carolina Home Builders Passive Solar Program

  18. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  19. Modelling a suitable location for Urban Solid Waste Management using AHP method and GIS -A geospatial approach and MCDM Model

    NASA Astrophysics Data System (ADS)

    Iqbal, M.; Islam, A.; Hossain, A.; Mustaque, S.

    2016-12-01

    Multi-Criteria Decision Making(MCDM) is advanced analytical method to evaluate appropriate result or decision from multiple criterion environment. Present time in advanced research, MCDM technique is progressive analytical process to evaluate a logical decision from various conflict. In addition, Present day Geospatial approach (e.g. Remote sensing and GIS) also another advanced technical approach in a research to collect, process and analyze various spatial data at a time. GIS and Remote sensing together with the MCDM technique could be the best platform to solve a complex decision making process. These two latest process combined very effectively used in site selection for solid waste management in urban policy. The most popular MCDM technique is Weighted Linear Method (WLC) where Analytical Hierarchy Process (AHP) is another popular and consistent techniques used in worldwide as dependable decision making. Consequently, the main objective of this study is improving a AHP model as MCDM technique with Geographic Information System (GIS) to select a suitable landfill site for urban solid waste management. Here AHP technique used as a MCDM tool to select the best suitable landfill location for urban solid waste management. To protect the urban environment in a sustainable way municipal waste needs an appropriate landfill site considering environmental, geological, social and technical aspect of the region. A MCDM model generate from five class related which related to environmental, geological, social and technical using AHP method and input the result set in GIS for final model location for urban solid waste management. The final suitable location comes out that 12.2% of the area corresponds to 22.89 km2 considering the total study area. In this study, Keraniganj sub-district of Dhaka district in Bangladesh is consider as study area which is densely populated city currently undergoes an unmanaged waste management system especially the suitable landfill sites for waste dumping site.

  20. The NASA Scientific and Technical Information Program: Exploring challenges, creating opportunities

    NASA Technical Reports Server (NTRS)

    Sepic, Ronald P.

    1993-01-01

    The NASA Scientific and Technical Information (STI) Program offers researchers access to the world's largest collection of aerospace information. An overview of Program activities, products and services, and new directions is presented. The R&D information cycle is outlined and specific examples of the NASA STI Program in practice are given. Domestic and international operations and technology transfer activities are reviewed and an agenda for the STI Program NASA-wide is presented. Finally, the incorporation of Total Quality Management and evaluation metrics into the STI Program is discussed.

  1. Exploration studies technical report, FY1988 status. Volume 1: Technical summary

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The Office of Exploration (OEXP) at NASA Headquarters has been tasked with defining and recommending alternatives for an early 1990's nationaL decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Lyndon B. Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report, produced by the MASE, describes the process that has been developed in a case study approach. The four case studies developed in FY88 include: (1) Human Expedition to Phobos; (2) Human Expedition to Mars; (3) Lunar Observatory; and (4) Lunar Outpost to Early Mars Evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work.

  2. H-Coal Pilot Plant Phase II construction, Catlettsburg, Kentucky. Final construction management report, December 1976-February 1980. [February, 1977 to approximately January, 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-03-01

    This report covers the H-Coal Pilot Plant facility located in Catlettsburg, Kentucky. The authorization for this project was under DOE contract No. DE-AC05-78ET11052, formally ET-78-C-01-3224. Badger Plants, Inc. carried out the construction management of this facility. The estimated total cost is $147,265,013. A brief process/technical description of the Pilot Plant covers subjects such as objectives, capacity, expected life, etc. A brief technical description of each processing unit, including its purpose in the overall operations of the plant is given. A general description of the organizational history of the project is given. Current overall organization and a description of the responsibilitiesmore » of each participant are included. Badger Plant's organization at manager level is shown.« less

  3. 77 FR 30585 - Operating Limitations at New York LaGuardia Airport; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... limiting operations at LaGuardia Airport until the final Congestion Management Rule for LaGuardia Airport... this Order contact: Patricia Bynum, System Operations Services, Air Traffic Organization, Federal... Limiting Operations at New York LaGuardia Airport (LGA).\\1\\ As a result of the extension, the Order remains...

  4. Student War Loans Program: Final Report. Bulletin, 1946, No. 14

    ERIC Educational Resources Information Center

    Flynt, R. C. M.

    1946-01-01

    The Student War Loans Program, officially "Loans to Students in Technical and Professional Fields (National Defense)," was one of five essential wartime programs administered by the U. S. Office of Education. The Division of Higher Education administered two of these programs, namely, the Engineering, Science and Management War Training Program…

  5. 32 CFR Appendix F to Part 505 - Example of a System of Records Notice

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... series number related to the subject matter, and the final letter group shows the system manager's... use office symbols. (e) Categories of Individuals: Describe the individuals covered by the system. Use non-technical, specific categories of individuals about whom the Department of Army keeps records. Do...

  6. 32 CFR Appendix F to Part 505 - Example of a System of Records Notice

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... series number related to the subject matter, and the final letter group shows the system manager's... use office symbols. (e) Categories of Individuals: Describe the individuals covered by the system. Use non-technical, specific categories of individuals about whom the Department of Army keeps records. Do...

  7. Task Analysis and Job Descriptions for Robotics/Automated Systems Technicians. Final Report. Volume 1.

    ERIC Educational Resources Information Center

    Hull, Daniel M.; Lovett, James E.

    The Robotics/Automated Systems Technician (RAST) project developed a robotics technician model curriculum for the use of state directors of vocational education and two-year college vocational/technical educators. A baseline management plan was developed to guide the project. To provide awareness, project staff developed a dissemination plan…

  8. A Forest Products Technology Program for Washington Community Colleges. Final Report.

    ERIC Educational Resources Information Center

    Grotefend, Robert T.

    This report describes a project to develop a forest product technology curriculum that prepares students at the technical level, junior management, to work in the manufacturing of wood and bark into lumber, plywood, particle board, laminates, and pulp chips. Chapter 1 describes project objectives and procedures followed. In chapter 2 the history…

  9. Final Report, “Exploiting Global View for Resilience”

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chien, Andrew

    2017-03-29

    Final technical report for the "Exploiting Global View for Resilience" project. The GVR project aims to create a new approach to portable, resilient applications. The GVR approach builds on a global view data model,, adding versioning (multi-version), user control of timing and rate (multi-stream), and flexible cross layer error signalling and recovery. With a versioned array as a portable abstraction, GVR enables application programmers to exploit deep scientific and application code insights to manage resilience (and its overhead) in a flexible, portable fashion.

  10. A Case Study On Human Capital Mismanagement In The United States Air Force

    DTIC Science & Technology

    2016-05-08

    author(s) and do not reflect the official policy or position of the US government or the Department of Defense. In accordance with Air Force Instruction...The final category for this analysis encompasses the 2 Acquisition Managers (63A).3 These individuals do not necessarily hold technical degrees...orders of magnitude more engineers than they do rated officers, and are responsible for the institutional leadership and the management of the test

  11. Jefferson Proving Ground, South of the Fining Line, Final Remedial Investigation/Feasibility Study, Resource Management Plan

    DTIC Science & Technology

    1993-01-01

    and various DOD sites. I From 1984 to 1987, Mr. Pincock was a Certified Radiation and Chemistry Technician for United Nuclear Industries. He performed...in 1983, Mr. Pincock assisted the senior technical staff in radiation protection as a Junior Health Physics Technician at the Nuclear Support Services...SCOPE OF PROGRAM This plan contains a description of the personnel and procedures for managing the Remedial Investigation/Feasibility Study (RI/FS) at

  12. Multiparametric prostate MRI: technical conduct, standardized report and clinical use.

    PubMed

    Manfredi, Matteo; Mele, Fabrizio; Garrou, Diletta; Walz, Jochen; Fütterer, Jurgen J; Russo, Filippo; Vassallo, Lorenzo; Villers, Arnauld; Emberton, Mark; Valerio, Massimo

    2018-02-01

    Multiparametric prostate MRI (mp-MRI) is an emerging imaging modality for diagnosis, characterization, staging, and treatment planning of prostate cancer (PCa). The technique, results reporting, and its role in clinical practice have been the subject of significant development over the last decade. Although mp-MRI is not yet routinely used in the diagnostic pathway, almost all urological guidelines have emphasized the potential role of mp-MRI in several aspects of PCa management. Moreover, new MRI sequences and scanning techniques are currently under evaluation to improve the diagnostic accuracy of mp-MRI. This review presents an overview of mp-MRI, summarizing the technical applications, the standardized reporting systems used, and their current roles in various stages of PCa management. Finally, this critical review also reports the main limitations and future perspectives of the technique.

  13. Air traffic control by distributed management in a MLS environment

    NASA Technical Reports Server (NTRS)

    Kreifeldt, J. G.; Parkin, L.; Hart, S.

    1977-01-01

    The microwave landing system (MLS) is a technically feasible means for increasing runway capacity since it could support curved approaches to a short final. The shorter the final segment of the approach, the wider the variety of speed mixes possible so that theoretically, capacity would ultimately be limited by runway occupance time only. An experiment contrasted air traffic control in a MLS environment under a centralized form of management and under distributed management which was supported by a traffic situation display in each of the 3 piloted simulators. Objective flight data, verbal communication and subjective responses were recorded on 18 trial runs lasting about 20 minutes each. The results were in general agreement with previous distributed management research. In particular, distributed management permitted a smaller spread of intercrossing times and both pilots and controllers perceived distributed management as the more 'ideal' system in this task. It is concluded from this and previous research that distributed management offers a viable alternative to centralized management with definite potential for dealing with dense traffic in a safe, orderly and expeditious manner.

  14. [Training of pharmacy personnel in the management of a centralized unit: the Oncolor network experience].

    PubMed

    Henn-Ménétré, Sophie; Noirez, Véronique; Husson, Julien; Vallance, Catherine; Lestreit, Jean-Michel; Llorens, Anne-Marie; May, Isabelle; Grandhaye, Jean-Pierre; Bey, Pierre

    2003-10-01

    The network of cancer care units in Lorraine area (Oncolor) developed management training for people working in chemotherapy units, and cytotoxic drug preparation. The programme was framed both for staff of executives (pharmacists), and technicians. Firstly, comparison between practices and theoretical recommendations lead to the elaboration of standardized operating procedures. Secondly, we elaborated a specific handbook for this education programme. A series of four-days independent sessions were organized for pharmacists and technicians. Each session combined theoretical and technical teaching for preparing antineoplastic drugs. Participants passing a successful final examination received a certificate from the Oncolor's network attesting their capacity to manage a chemotherapy unit. Four sessions were performed, with 35 participants. Only 31 passed at final examination. This preliminary experience will be enlarged to all members of the network and regularly brought up to date.

  15. 77 FR 9265 - Glen Canyon Dam Adaptive Management Work Group

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final.... L. 102-575) of 1992. The AMP includes a Federal advisory committee, the AMWG, a technical work group... administrative and resource issues pertaining to the AMP. To view a copy of the agenda and documents related to...

  16. Computer-Assisted Instruction in the Context of the Advanced Instructional System: Authoring Support Software. Final Report.

    ERIC Educational Resources Information Center

    Montgomery, Ann D.; Judd, Wilson A.

    This report details the design, development, and implementation of computer software to support the cost-effective production of computer assisted instruction (CAI) within the context of the Advanced Instructional System (AIS) located at Lowry Air Force Base. The report supplements the computer managed Air Force technical training that is…

  17. Common Elements of Risk

    DTIC Science & Technology

    2006-04-01

    8 Figure 5 : Threat and Operational Risk .................................................................... 9 Figure 6: Work Process...technical note might be applied to selected risk management topics. Finally, Section 5 , “Conclusion,” completes the report by summarizing the history...addressed in Section 5 . CMU/SEI-2006-TN-014 5 So far, our discussion has focused on the conceptual aspects of risk . The next section explores risk’s

  18. Wisconsin Workplace Partnership Training Program (National Workplace Literacy Program). June 1, 1992-December 31, 1993. Final Report.

    ERIC Educational Resources Information Center

    Wisconsin State Board of Vocational, Technical and Adult Education, Madison. Wisconsin Technical Coll. System.

    The Wisconsin Workplace Partnership Training Program involved the state's technical college system board, state chapter of the AFL-CIO, Wisconsin Manufacturers and Commerce, and Madison Center on Education and Work. The state-level education-labor-management partnership was mirrored at the local level in 28 worksite education centers. Instruction…

  19. Job Entry Level Competencies of a One Year Barber School Graduate. Final Report.

    ERIC Educational Resources Information Center

    Swerman, Richard A.; Wurtzel, Norbert K.

    To determine the competency level required of a one-year graduate from barber school and to obtain information that would enable vocational-technical schools to plan their curriculum to better meet student barber needs, a survey was conducted in Wisconsin of 629 barber shop managers, 75 journeymen, and 200 apprentices. Picked at random, these…

  20. Comparing Military and Civilian Skill Training: Instruction and Program Evaluation. Final Report, October 1 - December 31, 1976.

    ERIC Educational Resources Information Center

    Gray, Burl B.; And Others

    A questionnaire study was conducted to gather in-depth comparative data on job training practices in the Department of Defense (DOD), commercial business/institutions/industries (B/I/I), and proprietary trade/technical schools (T/TS). Detailed questionnaires requesting information on the management, conduct, and costs of twelve high-priority job…

  1. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glasser, Alan H.

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  2. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2013-01-01 2013-01-01 false Contents of applications; technical information in final...

  3. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2012-01-01 2012-01-01 false Contents of applications; technical information in final...

  4. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2014-01-01 2014-01-01 false Contents of applications; technical information in final...

  5. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2011-01-01 2011-01-01 false Contents of applications; technical information in final...

  6. OEXP exploration studies technical report. Volume 3: Special reports, studies, and indepth systems assessments

    NASA Technical Reports Server (NTRS)

    Roberts, Barney B.; Bland, Dan

    1988-01-01

    The Office of Exploration (OEXP) at NASA has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of manned exploration of the Solar System. The Mission analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report, produced by the MASE, describes the process used to conduct exploration studies and discusses the mission developed in a case study approach. The four case studies developed in FY88 include: (1) a manned expedition to PHOBOS; (2) a manned expedition to MARS; (3) a lunar surface observatory; and a lunar outpost to early Mars evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work.

  7. The Detour of an Obstetric Technology: Active Management of Labor Across Cultures.

    PubMed

    Maffi, Irene

    2016-01-01

    Active management of labor (AML) is an obstetric technology developed in Ireland in the 1970s to accelerate labor in nulliparous women. This technology achieved rapid success in Great Britain and in English-speaking countries outside America, which adopted it before many other states around the world. In this article, I explore AML's technical and social characteristics when it was first designed, and then examine its local inflections in a Jordanian and a Swiss maternity hospital to shed light on the ways its transnational circulation modifies its script. I argue that its application is shaped by local material constraints and specific sociocultural configurations, gender regimes, and hospital cultures. Finally, I make a comparative analysis of AML practices in these two settings and in the foundational textbook to disentangle the technical and sociocultural components modeling its local applications.

  8. Grid-Scale Energy Storage Demonstration of Ancillary Services Using the UltraBattery Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seasholtz, Jeff

    2015-08-20

    The collaboration described in this document is being done as part of a cooperative research agreement under the Department of Energy’s Smart Grid Demonstration Program. This document represents the Final Technical Performance Report, from July 2012 through April 2015, for the East Penn Manufacturing Smart Grid Program demonstration project. This Smart Grid Demonstration project demonstrates Distributed Energy Storage for Grid Support, in particular the economic and technical viability of a grid-scale, advanced energy storage system using UltraBattery ® technology for frequency regulation ancillary services and demand management services. This project entailed the construction of a dedicated facility on the Eastmore » Penn campus in Lyon Station, PA that is being used as a working demonstration to provide regulation ancillary services to PJM and demand management services to Metropolitan Edison (Met-Ed).« less

  9. Risk Management for the International Space Station

    NASA Technical Reports Server (NTRS)

    Sebastian, J.; Brezovic, Philip

    2002-01-01

    The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

  10. Final Closeout Report University Research Program in Robotics for Environmental Restoration and Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James S. Tulenko; Carl Crane

    2004-08-24

    The report covers the 2003-04 contract period, with a retrospective of the 11 years for the contract, from 1993 to 2004. This includes personnel, technical publications and reports, plus research laboratories employed. Specific information is given in eight research areas, reporting on all technology developed and/or deployed by the University of Florida.

  11. Pennsylvania Occupational Competency Assessment Program--1983. Final Report. Vocational-Technical Education Research Report, Volume 22, Number 2. Occupational Competency Evaluation Monograph, Number 15.

    ERIC Educational Resources Information Center

    Walter, Richard A.

    The Pennsylvania State University served as the Pennsylvania Coordinator of Occupational Competency Assessment (OCA). It managed the Pennsylvania OCA Program, which provides the secondary public schools of the state with competent vocational instructors as a component of teacher preparation at Temple University, Indiana University of Pennsylvania,…

  12. Management of Social Incentives in Air Force Technical Training: A Field Experiment. Final Report.

    ERIC Educational Resources Information Center

    Hakel, Milton D.; And Others

    The report is a study of the utility of social reinforcement for improving Air Force training. It was conducted through a field evaluation of social incentive instructional systems which would serve to improve student motivation, classroom performance, and attitudes. The participants included a total of 300 trainees from two Air Force bases; 25…

  13. Developing the Systems Engineering Experience Accelerator (SEEA) Prototype and Roadmap

    DTIC Science & Technology

    2012-10-24

    system attributes. These metrics track non-requirements performance, typically relate to production cost per unit, maintenance costs, training costs...immediately implement lessons learned from the training experience to the job, assuming the culture allows this. 1.3 MANAGEMENT PLAN/TECHNICAL OVERVIEW...resolving potential conflicts as they arise. Incrementally implement and continuously integrate capability in priority order, to ensure that final system

  14. The Independent Technical Analysis Process Final Report 2006-2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duberstein, Corey; Ham, Kenneth; Dauble, Dennis

    2007-03-01

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities. The Independent Technical Analysis Process (ITAP) was created to provide non-routine analysis for fish and wildlife agencies and tribes in particular and the public in general on matters related tomore » juvenile and adult salmon and steelhead passage through the mainstem hydrosystem. The process was designed to maintain the independence of analysts and reviewers from parties requesting analyses, to avoid potential bias in technical products. The objectives identified for this project were to administer a rigorous, transparent process to deliver unbiased technical assistance necessary to coordinate recommendations for storage reservoir and river operations that avoid potential conflicts between anadromous and resident fish. Seven work elements, designated by numbered categories in the Pisces project tracking system, were created to define and accomplish project goals as follows: (1) 118 Coordination - Coordinate technical analysis and review process: (a) Retain expertise for analyst/reviewer roles. (b) Draft research directives. (c) Send directive to the analyst. (d) Coordinate two independent reviews of the draft report. (e) Ensure reviewer comments are addressed within the final report. (2) 162 Analyze/Interpret Data - Implement the independent aspects of the project. (3) 122 Provide Technical Review - Implement the review process for the analysts. (4) 132 Produce Annual Report - FY06 annual progress report with Pisces Disseminate (5) 161 Disseminate Raw/Summary Data and Results - Post technical products on the ITAP web site. (6) 185-Produce Pisces Status Report - Provide periodic status reports to BPA. (7) 119 Manage and Administer Projects - project/contract administration.« less

  15. Henry Taube and Coordination Chemistry

    Science.gov Websites

    Shifts Caused by Cr++ in Aqueous Solutions, DOE Technical Report, 1962 Reactions of Solvated Ions Final Report, DOE Technical Report, 1962 Isotopic Discrimination of Some Solutes in Liquid Ammonia, DOE Technical Report, 1966 Final Technical Report of Research, DOE Technical Report, 1972 Top Additional Web

  16. George A. Olah, Carbocation and Hydrocarbon Chemistry

    Science.gov Websites

    . Final Technical Report. [HF:BF{sub 2}/H{sub 2}] , DOE Technical Report, 1980 Superacid Catalyzed Coal Conversion Chemistry. 1st and 2nd Quarterly Technical Progress Reports, September 1, 1983-March 30, 1984 , DOE Technical Report, 1984 Superacid Catalyzed Coal Conversion Chemistry. Final Technical Report

  17. Integrated design and management of complex and fast track projects

    NASA Astrophysics Data System (ADS)

    Mancini, Dario

    2003-02-01

    Modern scientific and technological projects are increasingly in competition over scientific aims, technological innovation, performance, time and cost. They require a dedicated and innovative organization able to satisfy contemporarily various technical and logistic constraints imposed by the final user, and guarantee the satisfaction of technical specifications, identified on the basis of scientific aims. In order to satisfy all the above, the management has to be strategically innovative and intuitive, by removing, first of all, the bottlenecks that are pointed out, usually only at the end of the projects, as the causes of general dissatisfaction. More than 30 years spent working on complex multidisciplinary systems and 20 years of formative experience in managing contemporarily both scientific, technological and industrial projects have given the author the possibility to study, test and validate strategies for parallel project management and integrated design, merged in a sort of unique optimized task, using the newly-coined word "Technomethodology". The paper highlights useful information to be taken into consideration during project organization to minimize the program deviations from the expected goals and describe some of the basic meanings of this new advanced method that is the key for parallel successful management of multiple and interdisciplinary activities.

  18. Night of the living color: horror scenarios in color management land

    NASA Astrophysics Data System (ADS)

    Lammens, Johan M.

    1998-12-01

    An ICC-based color management is becoming increasingly feasible and its picking up support from all the major high end design and pre-press applications as well as hardware manufacturers. In addition, the new sRGB standard is emerging as a way to effectively do 'color management for the masses', and is being supported by many leading manufacturers as well. While there certainly remain serious technical issues to address for both ICC and sRGB color management, it seems that the main problem users are facing today is how to integrate all components of their workflow into a seamless system, and how to configured each component to work well with all the others. This paper takes a brief look at the history of color management for a workflow perspective, and attempts to analyze how to compose and configured a quadruple color conversions can become a terrific nightmare. Some of the many ways to get the wrong results are briefly illustrated, as well as a few ways to get the right results. Finally, some technical recommendations are offered for how to improve the situation from a user point of view.

  19. Security management techniques and evaluative checklists for security force effectiveness. Technical report (final) Sep 80-Jul 81

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schurman, D.L.; Datesman, G.H. Jr; Truitt, J.O.

    The report presents a system for evaluating and correcting deficiencies in security-force effectiveness in licensed nuclear facilities. There are four checklists which security managers can copy directly, or can use as guidelines for developing their own checklists. The checklists are keyed to corrective-action guides found in the body of the report. In addition to the corrective-action guides, the report gives background information on the nature of security systems and discussions of various special problems of the licensed nuclear industry.

  20. Computing in high-energy physics

    NASA Astrophysics Data System (ADS)

    Mount, Richard P.

    2016-04-01

    I present a very personalized journey through more than three decades of computing for experimental high-energy physics, pointing out the enduring lessons that I learned. This is followed by a vision of how the computing environment will evolve in the coming ten years and the technical challenges that this will bring. I then address the scale and cost of high-energy physics software and examine the many current and future challenges, particularly those of management, funding and software-lifecycle management. Finally, I describe recent developments aimed at improving the overall coherence of high-energy physics software.

  1. NASA/Drexel program. [research effort in large-scale technical programs management for application to urban problems

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The results are reported of the NASA/Drexel research effort which was conducted in two separate phases. The initial phase stressed exploration of the problem from the point of view of three primary research areas and the building of a multidisciplinary team. The final phase consisted of a clinical demonstration program in which the research associates consulted with the County Executive of New Castle County, Delaware, to aid in solving actual problems confronting the County Government. The three primary research areas of the initial phase are identified as technology, management science, and behavioral science. Five specific projects which made up the research effort are treated separately. A final section contains the conclusions drawn from total research effort as well as from the specific projects.

  2. Problems of systems dataware using optoelectronic measuring means of linear displacement

    NASA Astrophysics Data System (ADS)

    Bazykin, S. N.; Bazykina, N. A.; Samohina, K. S.

    2017-10-01

    Problems of the dataware of the systems with the use of optoelectronic means of the linear displacement are considered in the article. The classification of the known physical effects, realized by the means of information-measuring systems, is given. The organized analysis of information flows in technical systems from the standpoint of determination of inaccuracies of measurement and management was conducted. In spite of achieved successes in automation of machine-building and instruments-building equipment in the field of dataware of the technical systems, there are unresolved problems, concerning the qualitative aspect of the production process. It was shown that the given problem can be solved using optoelectronic lazer information-measuring systems. Such information-measuring systems are capable of not only executing the measuring functions, but also solving the problems of management and control during processing, thereby guaranteeing the quality of final products.

  3. 77 FR 46306 - Fluxapyroxad; Pesticide Tolerances Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ...; Pesticide Tolerances Technical Amendment AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule; technical amendment. SUMMARY: EPA issued a final rule in the Federal Register of May 14, 2012, concerning.... Inadvertently, the terminology for the oilseed crop group and for dried plums was incorrect. This technical...

  4. Integrated Training System for Air Force On-the-Job Training: Specification Development. Final Technical Paper.

    ERIC Educational Resources Information Center

    Carson, Stuart B.; And Others.

    The Air Force conducted this study for two purposes: (1) to define the system of Air Force On-the-Job Training (OJT); and (2) to prepare a set of functional specifications for an integrated, base-level OJT evaluation and management system with linkages to the Major Commands and Air Staff. The study was conducted in four phases. During the first…

  5. E-Quality in the Workplace: Quality Circles or Quality of Working Life Programs in the US.

    ERIC Educational Resources Information Center

    Savage, Grant T.; Romano, Richard

    Quality Circle (QC) and Quality of Working Life (QWL) in the United States are similar in that both stress participative decision making, preserve management's prerogative to have the final say, and are voluntary. QC and QWL programs differ, however, in that labor unions are more involved in QWLs; QCs deal only with technical problems related to…

  6. Early Childhood Reform in Seven Communities: Front-Line Practice, Agency Management, and Public Policy. [Volume I: Final Technical Report.] Studies of Education Reform.

    ERIC Educational Resources Information Center

    Schultz, Tom; And Others

    An era of substantial growth in investment of resources, program development, and research has led to tangible gains in the scope and quality of early childhood education programs. However, the system of early childhood education programs is plagued by unequal access and inconsistent, inadequate levels of quality. Additionally, the focus of…

  7. Scalable data management, analysis and visualization (SDAV) Institute. Final Scientific/Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geveci, Berk

    The purpose of the SDAV institute is to provide tools and expertise in scientific data management, analysis, and visualization to DOE’s application scientists. Our goal is to actively work with application teams to assist them in achieving breakthrough science, and to provide technical solutions in the data management, analysis, and visualization regimes that are broadly used by the computational science community. Over the last 5 years members of our institute worked directly with application scientists and DOE leadership-class facilities to assist them by applying the best tools and technologies at our disposal. We also enhanced our tools based on inputmore » from scientists on their needs. Many of the applications we have been working with are based on connections with scientists established in previous years. However, we contacted additional scientists though our outreach activities, as well as engaging application teams running on leading DOE computing systems. Our approach is to employ an evolutionary development and deployment process: first considering the application of existing tools, followed by the customization necessary for each particular application, and then the deployment in real frameworks and infrastructures. The institute is organized into three areas, each with area leaders, who keep track of progress, engagement of application scientists, and results. The areas are: (1) Data Management, (2) Data Analysis, and (3) Visualization. Kitware has been involved in the Visualization area. This report covers Kitware’s contributions over the last 5 years (February 2012 – February 2017). For details on the work performed by the SDAV institute as a whole, please see the SDAV final report.« less

  8. Implementation of quality management in early stages of research and development projects at a university.

    PubMed

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  9. Management of technical date in Nihon Doro kodan

    NASA Astrophysics Data System (ADS)

    Hanada, Jun'ichi

    Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.

  10. Embracing the Open-Source Movement for the Management of Spatial Data: A Case Study of African Trypanosomiasis in Kenya

    PubMed Central

    Langley, Shaun A.; Messina, Joseph P.

    2011-01-01

    The past decade has seen an explosion in the availability of spatial data not only for researchers, but the public alike. As the quantity of data increases, the ability to effectively navigate and understand the data becomes more challenging. Here we detail a conceptual model for a spatially explicit database management system that addresses the issues raised with the growing data management problem. We demonstrate utility with a case study in disease ecology: to develop a multi-scale predictive model of African Trypanosomiasis in Kenya. International collaborations and varying technical expertise necessitate a modular open-source software solution. Finally, we address three recurring problems with data management: scalability, reliability, and security. PMID:21686072

  11. Embracing the Open-Source Movement for the Management of Spatial Data: A Case Study of African Trypanosomiasis in Kenya.

    PubMed

    Langley, Shaun A; Messina, Joseph P

    2011-01-01

    The past decade has seen an explosion in the availability of spatial data not only for researchers, but the public alike. As the quantity of data increases, the ability to effectively navigate and understand the data becomes more challenging. Here we detail a conceptual model for a spatially explicit database management system that addresses the issues raised with the growing data management problem. We demonstrate utility with a case study in disease ecology: to develop a multi-scale predictive model of African Trypanosomiasis in Kenya. International collaborations and varying technical expertise necessitate a modular open-source software solution. Finally, we address three recurring problems with data management: scalability, reliability, and security.

  12. The Skills that Technical Communicators Need: An Investigation of Technical Communication Graduates, Managers, and Curricula

    ERIC Educational Resources Information Center

    Whiteside, Aimee L.

    2003-01-01

    This study examines the skills that recent technical communication graduates and managers believe technical communication students need before entering business and industry as new technical communicators. Through questionnaires and interviews with recent graduates and managers of technical communication departments as well as an analysis of the…

  13. NASA Space Environments Technical Discipline Team Space Weather Activities

    NASA Astrophysics Data System (ADS)

    Minow, J. I.; Nicholas, A. C.; Parker, L. N.; Xapsos, M.; Walker, P. W.; Stauffer, C.

    2017-12-01

    The Space Environment Technical Discipline Team (TDT) is a technical organization led by NASA's Technical Fellow for Space Environments that supports NASA's Office of the Chief Engineer through the NASA Engineering and Safety Center. The Space Environments TDT conducts independent technical assessments related to the space environment and space weather impacts on spacecraft for NASA programs and provides technical expertise to NASA management and programs where required. This presentation will highlight the status of applied space weather activities within the Space Environment TDT that support development of operational space weather applications and a better understanding of the impacts of space weather on space systems. We will first discuss a tool that has been developed for evaluating space weather launch constraints that are used to protect launch vehicles from hazardous space weather. We then describe an effort to better characterize three-dimensional radiation transport for CubeSat spacecraft and processing of micro-dosimeter data from the International Space Station which the team plans to make available to the space science community. Finally, we will conclude with a quick description of an effort to maintain access to the real-time solar wind data provided by the Advanced Composition Explorer satellite at the Sun-Earth L1 point.

  14. Enterprise Systems Value-Based R&D Portfolio Analytics: Methods, Processes, and Tools

    DTIC Science & Technology

    2014-01-14

    Enterprise Systems Value-Based R&D Portfolio Analytics: Methods, Processes, and Tools Final Technical Report SERC -2014-TR-041-1 January 14...by the U.S. Department of Defense through the Systems Engineering Research Center ( SERC ) under Contract H98230-08-D-0171 (Task Order 0026, RT 51... SERC is a federally funded University Affiliated Research Center managed by Stevens Institute of Technology Any opinions, findings and

  15. Low-Cost, Net-Shape Ceramic Radial Turbine Program

    DTIC Science & Technology

    1985-05-01

    PROGRAM ELEMENT. PROJECT. TASK Garrett Turbine Engine Company AE OKUI UBR 111 South 34th Street, P.O. Box 2517 Phoenix, Arizona 85010 %I. CONTROLLING...processing iterations. Program management and materials characterization were conducted at Garrett Turbine Engine Company (GTEC), test bar and rotor...automotive gas turbine engine rotor development efforts at ACC. xvii PREFACE This is the final technical report of the Low-Cost, Net- Shape Ceramic

  16. 32 CFR 37.895 - How is the final performance report to be sent to the Defense Technical Information Center?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... How is the final performance report to be sent to the Defense Technical Information Center? (a... 32 National Defense 1 2014-07-01 2014-07-01 false How is the final performance report to be sent to the Defense Technical Information Center? 37.895 Section 37.895 National Defense Department of...

  17. 32 CFR 37.895 - How is the final performance report to be sent to the Defense Technical Information Center?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... How is the final performance report to be sent to the Defense Technical Information Center? (a... 32 National Defense 1 2011-07-01 2011-07-01 false How is the final performance report to be sent to the Defense Technical Information Center? 37.895 Section 37.895 National Defense Department of...

  18. 32 CFR 37.895 - How is the final performance report to be sent to the Defense Technical Information Center?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... How is the final performance report to be sent to the Defense Technical Information Center? (a... 32 National Defense 1 2013-07-01 2013-07-01 false How is the final performance report to be sent to the Defense Technical Information Center? 37.895 Section 37.895 National Defense Department of...

  19. 32 CFR 37.895 - How is the final performance report to be sent to the Defense Technical Information Center?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false How is the final performance report to be sent to the Defense Technical Information Center? 37.895 Section 37.895 National Defense Department of... How is the final performance report to be sent to the Defense Technical Information Center? (a...

  20. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  1. The Wide-area Energy Management System Phase 2 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.

    2010-08-31

    The higher penetration of intermittent generation resources (including wind and solar generation) in the Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) balancing authorities (BAs) raises issue of requiring expensive additional fast grid balancing services in response to additional intermittency and fast up and down power ramps in the electric supply system. The overall goal of the wide-area energy management system (WAEMS) project is to develop the principles, algorithms, market integration rules, a functional design, and a technical specification for an energy storage system to help cope with unexpected rapid changes in renewable generation power output. The resultingmore » system will store excess energy, control dispatchable load and distributed generation, and utilize inter-area exchange of the excess energy between the California ISO and Bonneville Power Administration control areas. A further goal is to provide a cost-benefit analysis and develop a business model for an investment-based practical deployment of such a system. There are two tasks in Phase 2 of the WAEMS project: the flywheel field tests and the battery evaluation. Two final reports, the Wide-area Energy Management System Phase 2 Flywheel Field Tests Final Report and the Wide-area Energy Storage and Management System Battery Storage Evaluation, were written to summarize the results of the two tasks.« less

  2. End of FY10 report - used fuel disposition technical bases and lessons learned : legal and regulatory framework for high-level waste disposition in the United States.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiner, Ruth F.; Blink, James A.; Rechard, Robert Paul

    This report examines the current policy, legal, and regulatory framework pertaining to used nuclear fuel and high level waste management in the United States. The goal is to identify potential changes that if made could add flexibility and possibly improve the chances of successfully implementing technical aspects of a nuclear waste policy. Experience suggests that the regulatory framework should be established prior to initiating future repository development. Concerning specifics of the regulatory framework, reasonable expectation as the standard of proof was successfully implemented and could be retained in the future; yet, the current classification system for radioactive waste, including hazardousmore » constituents, warrants reexamination. Whether or not consideration of multiple sites are considered simultaneously in the future, inclusion of mechanisms such as deliberate use of performance assessment to manage site characterization would be wise. Because of experience gained here and abroad, diversity of geologic media is not particularly necessary as a criterion in site selection guidelines for multiple sites. Stepwise development of the repository program that includes flexibility also warrants serious consideration. Furthermore, integration of the waste management system from storage, transportation, and disposition, should be examined and would be facilitated by integration of the legal and regulatory framework. Finally, in order to enhance acceptability of future repository development, the national policy should be cognizant of those policy and technical attributes that enhance initial acceptance, and those policy and technical attributes that maintain and broaden credibility.« less

  3. Analysis of a display and control system man-machine interface concept. Volume 1: Final technical report

    NASA Technical Reports Server (NTRS)

    Karl, D. R.

    1972-01-01

    An evaluation was made of the feasibility of utilizing a simplified man machine interface concept to manage and control a complex space system involving multiple redundant computers that control multiple redundant subsystems. The concept involves the use of a CRT for display and a simple keyboard for control, with a tree-type control logic for accessing and controlling mission, systems, and subsystem elements. The concept was evaluated in terms of the Phase B space shuttle orbiter, to utilize the wide scope of data management and subsystem control inherent in the central data management subsystem provided by the Phase B design philosophy. Results of these investigations are reported in four volumes.

  4. A conceptual framework for addressing complexity and unfolding transition dynamics when developing sustainable adaptation strategies in urban water management.

    PubMed

    Fratini, C F; Elle, M; Jensen, M B; Mikkelsen, P S

    2012-01-01

    To achieve a successful and sustainable adaptation to climate change we need to transform the way we think about change. Much water management research has focused on technical innovation with a range of new solutions developed to achieve a 'more sustainable and integrated urban water management cycle'. But Danish municipalities and utility companies are struggling to bring such solutions into practice. 'Green infrastructure', for example, requires the consideration of a larger range of aspects related to the urban context than the traditional urban water system optimization. There is the need for standardized methods and guidelines to organize transdisciplinary processes where different types of knowledge and perspectives are taken into account. On the basis of the macro-meso-micro pattern inspired by complexity science and transition theory, we developed a conceptual framework to organize processes addressing the complexity characterizing urban water management in the context of climate change. In this paper the framework is used to organize a research process aiming at understanding and unfolding urban dynamics for sustainable transition. The final goal is to enable local authorities and utilities to create the basis for managing and catalysing the technical and organizational innovation necessary for a sustainable transition towards climate change adaptation in urban areas.

  5. 25 CFR 286.11 - Management and technical assistance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Management and technical assistance. 286.11 Section 286... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making... insure that competent management and technical assistance is available to the grantee in the preparation...

  6. 25 CFR 286.11 - Management and technical assistance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Management and technical assistance. 286.11 Section 286... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making... insure that competent management and technical assistance is available to the grantee in the preparation...

  7. 25 CFR 286.11 - Management and technical assistance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Management and technical assistance. 286.11 Section 286.11... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making... insure that competent management and technical assistance is available to the grantee in the preparation...

  8. 25 CFR 286.11 - Management and technical assistance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Management and technical assistance. 286.11 Section 286... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making... insure that competent management and technical assistance is available to the grantee in the preparation...

  9. Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1

    NASA Technical Reports Server (NTRS)

    Estes, Ronald H. (Editor)

    1993-01-01

    This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.

  10. The evaluation of a framework for measuring the non-technical ward round skills of final year nursing students: An observational study.

    PubMed

    Murray, Kara; McKenzie, Karen; Kelleher, Michael

    2016-10-01

    The importance of non-technical skills (NTS) to patient outcomes is increasingly being recognised, however, there is limited research into how such skills can be taught and evaluated in student nurses in relation toward rounds. This pilot study describes an evaluation of a NTS framework that could potentially be used to measure ward round skills of student nurses. The study used an observational design. Potential key NTS were identified from existing literature and NTS taxonomies. The proposed framework was then used to evaluate whether the identified NTS were evident in a series of ward round simulations that final year general nursing students undertook as part of their training. Finally, the views of a small group of qualified nurse educators, qualified nurses and general nursing students were sought about whether the identified NTS were important and relevant to practice. The proposed NTS framework included seven categories: Communication, Decision Making, Situational Awareness, Teamwork and Task Management, Student Initiative and Responsiveness to Patient. All were rated as important and relevant to practice. The pilot study suggests that the proposed NTS framework could be used as a means of evaluating student nurse competencies in respect of many non-technical skills required for a successful ward round. Further work is required to establish the validity of the framework in educational settings and to determine the extent to which it is of use in a non-simulated ward round setting. Copyright © 2016 Elsevier Ltd. All rights reserved.

  11. 76 FR 18624 - Research, Technical Assistance and Training Programs: Notice of Final Circular

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... to FTA Circular 6100.1D, Research and Technical Assistance Training Program: Application Instructions... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Research, Technical Assistance and Training Programs: Notice of Final Circular AGENCY: Federal Transit Administration (FTA), DOT. ACTION...

  12. Patient Protection and Affordable Care Act; establishment of the Multi-State Plan Program for the Affordable Insurance Exchanges. Final rule.

    PubMed

    2014-02-24

    The U.S. Office of Personnel Management (OPM) is issuing a final rule implementing modifications to the Multi-State Plan (MSP) Program based on the experience of the Program to date. OPM established the MSP Program pursuant to the Affordable Care Act. This rule clarifies the approach used to enforce the applicable standards of the Affordable Care Act with respect to health insurance issuers that contract with OPM to offer MSP options; amends MSP standards related to coverage area, benefits, and certain contracting provisions under section 1334 of the Affordable Care Act; and makes non-substantive technical changes.

  13. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  14. 75 FR 56857 - Pilot, Flight Instructor, and Pilot School Certification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... of part 141. Discussion of Technical Amendment Section 141.5(d) establishes the quality of training... Certification AGENCY: Federal Aviation Administration, DOT. ACTION: Final rule; technical amendment. SUMMARY: The Federal Aviation Administration (FAA) is making minor technical changes to a final rule published...

  15. Customer Driven Uniform Manufacture (CDUM) Program. Customer Driven Uniform Management Apparel Research

    DTIC Science & Technology

    2008-11-13

    Final Technical Report 4 consumption patterns, and production status. The current version of the AAVS DataMart contains apparel and textile data...which stores the summary of the activity by item; Daily Issues which contains all the issues for the day; Daily Receipts which contains all receipts...entered for the day; and, Open Requisitions which contains all open DSCP Requisitions and Local Purchase Orders. Supply and financial transactions are

  16. Modeling Tool to Quantify Metal Sources in Stormwater Discharges at Naval Facilities (NESDI Project 455)

    DTIC Science & Technology

    2014-06-01

    TECHNICAL REPORT 2077 June 2014 Modeling Tool to Quantify Metal Sources in Stormwater Discharges at Naval Facilities (NESDI Project 455... Stormwater Discharges at Naval Facilities (NESDI Project 455) Final Report and Guidance C. Katz K. Sorensen E. Arias SSC Pacific R. Pitt L. Talebi...demonstration/validation project to assess the use of the urban stormwater model Windows Source Loading and Management Model (WinSLAMM) to characterize

  17. The New York Adequacy Study: "Determining the Cost of Providing All Children in New York an Adequate Education." Volume 1: Final Report [and] Volume 2: Technical Appendices

    ERIC Educational Resources Information Center

    Chambers, Jay G.; Parrish, Thomas B.; Levin, Jesse D.; Smith, James R.; Guthrie, James W.; Seder, Rich C.; Taylor, Lori

    2004-01-01

    What is the cost of providing all New York public school students a full opportunity to meet the Regents Learning Standards? This report presents the results of a fifteen-month project undertaken jointly by American Institutes for Research (AIR) and Management Analysis and Planning, Inc. (MAP) to answer this question. This is a "costing…

  18. Cooperative Program and Facilities Planning, Southern Maine Vocational Technical Institute--University of Maine at Portland-Gorham. Final Report: Higher Education Facilities Planning Grant.

    ERIC Educational Resources Information Center

    Pressley, Warren H., Jr.

    In response to the great need for less than baccalaureate degree programs in Maine, a grant was made to finance the development of the three programs described here. Offered are a AA degree program in Hotel, Motel, and Restaurant Management, a program of inservice education in Respiratory Therapy which should serve as a model for programs in other…

  19. Manufacturing Steps for Commercial Production of Nano-Structure Capacitors Final Report CRADA No. TC02159.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barbee, T. W.; Schena, D.

    This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and TroyCap LLC, to develop manufacturing steps for commercial production of nano-structure capacitors. The technical objective of this project was to demonstrate high deposition rates of selected dielectric materials which are 2 to 5 times larger than typical using current technology.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kervin, Karina E.; Cook, Robert B.; Michener, William K.

    Conventional wisdom makes the suggestion that there are benefits to the creation of shared repositories of scientific data. Funding agencies require that the data from sponsored projects be shared publicly, but individual researchers often see little personal benefit to offset the work of creating easily sharable data. These conflicting forces have led to the emergence of a new role to support researchers: data managers. This paper identifies key differences between the socio-technical context of data managers and other "human infrastructure" roles articulated previously in Computer Supported Cooperative Work (CSCW) literature and summarizes the challenges that data managers face when acceptingmore » data for archival and reuse. Finally, while data managers' work is critical for advancing science and science policy, their work is often invisible and under-appreciated since it takes place behind the scenes.« less

  1. 77 FR 29247 - Federal Motor Vehicle Safety Standards; Occupant Crash Protection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ...). ACTION: Final rule; technical amendments. SUMMARY: This final rule makes technical amendments to Federal... advanced air bag requirements. As written now, the general warning label requirements contain an explicit... equipment requirements for restraint systems. This document makes technical amendments to several of the...

  2. 78 FR 65689 - Technical Mapping Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0039] Technical Mapping Advisory Council AGENCY: Federal Emergency Management Agency, DHS. ACTION: Committee Management; Request for Applicants for Appointment to the Federal Emergency Management Agency's Technical...

  3. Pulp fiction - The volunteer concept (or how not to site additional LLRW disposal capacity)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burton, D.A.

    1995-12-31

    Experiences of compacts and of individual states throughout the nation indicate that low-level radioactive waste disposal siting processes, based from the beginning upon the volunteer concept are fraught with problems. Most apparent among these problems is that the volunteer concept does not lead to scientifically and technically based siting endeavors. Ten years have passed since the Amendments Act of 1985, and no compact or state has been - successful in providing for new LLRW disposal capacity. That failure can be traced in part to the reliance upon the volunteer concept in siting attempts. If success is to be achieved, themore » future direction for LLRW management must focus on three areas: first, a comprehensive evaluation of all LLRW management options, including reduction of waste generated and on-site storage; secondly, a comprehensive evaluation of the current as well as projected waste stream, to determine the amount of disposal capacity actually needed; and, finally, sound scientifically and technically based siting processes.« less

  4. International ultraviolet explorer observatory operations

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This volume contains the Final Report for the International Ultraviolet Explorer (IUE) Observatory Operations contract, NAS5-28787. The report summarizes the activities of the IUE Observatory over the 13-month period from November 1985 through November 1986 and is arranged in sections according to the functions specified in the Statement of Work (SOW) of the contract. In order to preserve numerical correspondence between the technical SOW elements specified by the contract and the sections of this report, project management activities (SOW element 0.0.) are reported here in Section 7, following the reports of technical SOW elements 1.0 through 6.0. Routine activities have been summarized briefly whenever possible; statistical compilations, reports, and more lengthy supplementary material are contained in the Appendices.

  5. Tanks Focus Area Site Needs Assessment - FY 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.

    2001-04-30

    The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less

  6. 13 CFR 124.701 - What is the purpose of the 7(j) management and technical assistance program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) management and technical assistance program? 124.701 Section 124.701 Business Credit and Assistance SMALL...) Business Development Management and Technical Assistance Program § 124.701 What is the purpose of the 7(j) management and technical assistance program? Section 7(j)(1) of the Small Business Act, 15 U.S.C. 636(j)(1...

  7. Technical Communications in Aeronautics: Results of an Exploratory Study. An Analysis of Profit Managers' and Nonprofit Managers' Responses. NASA Technical Memorandum 101626.

    ERIC Educational Resources Information Center

    Pinelli, Thomas E.; And Others

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that profit and nonprofit managers in the aerospace community have different technical communications practices. Profit and nonprofit managers were compared in five…

  8. Assessing neurosurgical non-technical skills: an exploratory study of a new behavioural marker system.

    PubMed

    Michinov, Estelle; Jamet, Eric; Dodeler, Virginie; Haegelen, Claire; Jannin, Pierre

    2014-10-01

    The management of non-technical skills is a major factor affecting teamwork quality and patient safety. This article presents a behavioural marker system for assessing neurosurgical non-technical skills (BMS-NNTS). We tested the BMS during deep brain stimulation surgery. We developed the BMS in three stages. First, we drew up a provisional assessment tool based on the literature and observation tools developed for other surgical specialties. We then analysed videos made in an operating room (OR) during deep brain stimulation operations in order to ensure there were no significant omissions from the skills list. Finally, we used five videos of operations to identify the behavioural markers of non-technical skills in verbal communications. Analyses of more than six hours of observations revealed 3515 behaviours from which we determined the neurosurgeon's non-technical skills behaviour pattern. The neurosurgeon frequently engaged in explicit coordination, situation awareness and leadership behaviours. In addition, the neurosurgeon's behaviours differed according to the stage of the operation and the OR staff members with whom she was communicating. Our behavioural marker system provides a structured approach to assessing non-technical skills in the field of neurosurgery. It can also be transferred to other surgical specialties and used in surgeon training curricula. © 2014 John Wiley & Sons, Ltd.

  9. Should Project Managers Buy Technical Data

    DTIC Science & Technology

    2017-04-06

    Should Project Managers Buy Technical Data? Jerry Harper April 6, 2017 PUBLISHED BY The Defense...intellectual property (IP) management and technical data rights (TDR) strategies. According to DoD Instruction 5000.02 (DoD, 2017), project managers (PMs...Defense Authorization Act NDI ................nondevelopmental item PM ................. project manager R&D ...............research and development

  10. Patient care in family medicine : what's new in the 2016 literature findings ?

    PubMed

    Cohidon, Christine; Senn, Nicolas

    During the last two decades in Europe, the scope of activities regarding chronic diseases management in family medicine has increased while technical activities and preventative care have decreased. A new literature review and meta-analysis confirms that the use of electronic health records improves the quality of care. In the field of interprofessionnality, the task delegation in chronic care management to nurses or medical assistants is a source of satisfaction for these professionals. At the same time, this could improve patients' quality of life. Finally, a systematic literature review reports the major assets according to the family physicians regarding their occupation i.e. freedom to organize and manage their own work, good balance between workload and income and high intellectual stimulation.

  11. Environmental Assessment for the Outgrant of Real Estate and Construction of JP-8 Pipeline and Receiving Facility at Travis Air Force Base

    DTIC Science & Technology

    2009-11-01

    ruderal plant vegetation. The area does not consist of a unique or ecologically sensitive habitat; therefore, potential impacts to vegetation would be...Name Degree Resource(s) Years of Experience Henry, Michael PhD, Ecology , Evolution , and Marine Biology B.S., Aquatic Biology -Lead Technical...Management. August. Fairfield, CA. Solano County. 2007. Final Environment Impact Report (EIR)—Montezuma Wind Plant Project. Prepared by Ecology and

  12. Naval Air Systems Command Needs to Improve Management of Waiver Requests (REDACTED)

    DTIC Science & Technology

    2015-05-15

    Acquisition Category ID5 major defense acquisition program that had its final production decision on January 3, 2014. The Navy designed the P -8A...submarines, was the primary reason the Navy invested in the P -8A aircraft. The anti-surface warfare mission provides maritime superiority 5 Acquisition ...frigates (small, fast military ships) at 110 nautical miles, which was one of the critical technical parameters. Also, the P -8A aircraft that was

  13. Department of Defense Joint Technical Architecture, Version 6.0. Volume 2

    DTIC Science & Technology

    2003-10-03

    information needs of our warfighters and the DoD enterprise. Information assurance will be integral to the GIG, and data management strategy initiatives will...IT investment strategy , and integration JTA Version 6.0, Final 3 October 2003 Vol. II–iv Executive Summaryoversight. DoDD 8100.1 establishes the GIG as... Strategy (May 9, 2003). In addition, numerous standards have been marked sunset, indicating deletion from the JTA on a future date to be determined by a

  14. Prediction of Ripple Properties in Shelf Seas. Mark 2 Predictor for Time Evolution

    DTIC Science & Technology

    2005-12-01

    respectively. It is seen in Figure 15 that the time -evolving ripple predictor manages to predict many of the features seen in the data: the growth from a...UNCLASSIFIED Prediction of Ripple Properties in Shelf Seas Mark 2 Predictor for Time Evolution Final Technical Report Prepared for US Office of Naval...distribution is unlimited j~j HR Wallingford UNCLASSIFIED Prediction of Ripple Properties in Shelf Seas Mark 2 Predictor for Time Evolution

  15. Advanced transportation system studies. Technical area 2: Heavy lift launch vehicle development. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Sections 10 to 13 of the Advanced Transportation System Studies final report are included in this volume. Section 10 contains a copy of an executive summary that was prepared by Lockheed Space Operations Company (LSOC) to document their support to the TA-2 contract during the first-year period of performance of the contract, May 1992 through May 1993. LSOC participated on the TA-2 contract as part of the concurrent engineering launch system definition team, and provided outstanding heavy lift launch vehicle (HLLV) ground operations requirements and concept assessments for Lockheed Missiles and Space Company (LMSC) through an intercompany work transfer as well as providing specific HLLV ground operations assessments at the direction of NASA KSC through KSC funding that was routed to the TA-2 contract. Section 11 contains a copy of a vehicle-independent, launch system health management requirements assessment. The purpose of the assessment was to define both health management requirements and the associated interfaces between a generic advanced transportation system launch vehicle and all related elements of the entire transportation system, including the ground segment. Section 12 presents the major TA-2 presentations provided to summarize the significant results and conclusions that were developed over the course of the contract. Finally, Section 13 presents the design and assessment report on the first lunar outpost heavy lift launch vehicle.

  16. 77 FR 30512 - Native American Career and Technical Education Program; Final Waivers and Extension of Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Final Waivers and... American Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84.101A. SUMMARY: For 60-month projects funded in fiscal year (FY) 2007 under the Native American Career...

  17. IWRM Policy in Colombia, drawbacks and strategies towards integration

    NASA Astrophysics Data System (ADS)

    Cardona, C. A.

    2016-12-01

    Since the establishment of the Integrated Water Resource Management National Policy in Colombia in 2010- IWRMNP, several initiatives has been developed in order to understand and manage water within the integration perspective. However, the Colombian institutional and legal frameworks do not favor the implementation of integrated management exercises, and many efforts have been fruitless in recent years. Additionally, there is an avalanche of techniques and available technologies to develop integrated models, analysis or assessments, which frequently are interpreted as the same tool. An analysis of the Colombian context in regulatory terms and institutions involved is carried out, as a prelude to address the topic of analysis modeling and integrated management. Moreover, in Colombian legislation there exists policies regarding integrated soil management, integrated biodiversity management, as well as several current international trends such as integrated landscape planning, integrated urban areas management etc. Therefore, and in light of the initial analysis, a discussion of redundancy or complementarity of such management it is carried out. Finally, a strategy is proposed for decision makers of local and regional level, trying to overcome technical gaps left by national policy and regulations. This is done from a discussion of the various anthropic damages to water resources systems. Also a classification of integrated models is proposed and a general approach to systems integrated resource management to finally present a state- management matrix methodology applicable to different cases and management requirements. The results of its implementation in a small basin is presented.

  18. 48 CFR 1852.235-73 - Final Scientific and Technical Reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Final Scientific and Technical Reports. 1852.235-73 Section 1852.235-73 Federal Acquisition Regulations System NATIONAL..., including recommendations and conclusions based on the experience and results obtained. The final report...

  19. A case-study of landfill minimization and material recovery via waste co-gasification in a new waste management scheme.

    PubMed

    Tanigaki, Nobuhiro; Ishida, Yoshihiro; Osada, Morihiro

    2015-03-01

    This study evaluates municipal solid waste co-gasification technology and a new solid waste management scheme, which can minimize final landfill amounts and maximize material recycled from waste. This new scheme is considered for a region where bottom ash and incombustibles are landfilled or not allowed to be recycled due to their toxic heavy metal concentration. Waste is processed with incombustible residues and an incineration bottom ash discharged from existent conventional incinerators, using a gasification and melting technology (the Direct Melting System). The inert materials, contained in municipal solid waste, incombustibles and bottom ash, are recycled as slag and metal in this process as well as energy recovery. Based on this new waste management scheme with a co-gasification system, a case study of municipal solid waste co-gasification was evaluated and compared with other technical solutions, such as conventional incineration, incineration with an ash melting facility under certain boundary conditions. From a technical point of view, co-gasification produced high quality slag with few harmful heavy metals, which was recycled completely without requiring any further post-treatment such as aging. As a consequence, the co-gasification system had an economical advantage over other systems because of its material recovery and minimization of the final landfill amount. Sensitivity analyses of landfill cost, power price and inert materials in waste were also conducted. The higher the landfill costs, the greater the advantage of the co-gasification system has. The co-gasification was beneficial for landfill cost in the range of 80 Euro per ton or more. Higher power prices led to lower operation cost in each case. The inert contents in processed waste had a significant influence on the operating cost. These results indicate that co-gasification of bottom ash and incombustibles with municipal solid waste contributes to minimizing the final landfill amount and has great possibilities maximizing material recovery and energy recovery from waste. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. TWRS technical baseline database manager definition document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acree, C.D.

    1997-08-13

    This document serves as a guide for using the TWRS Technical Baseline Database Management Systems Engineering (SE) support tool in performing SE activities for the Tank Waste Remediation System (TWRS). This document will provide a consistent interpretation of the relationships between the TWRS Technical Baseline Database Management software and the present TWRS SE practices. The Database Manager currently utilized is the RDD-1000 System manufactured by the Ascent Logic Corporation. In other documents, the term RDD-1000 may be used interchangeably with TWRS Technical Baseline Database Manager.

  1. The Office of Technology Development technical reports. A bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The US Department of Energy`s Office of Technology Development (OTD) within the Office of Environmental Management was established in 1989 to conduct an aggressive national program of applied research, development, demonstration, testing, and evaluation (RDDT&E) for innovative environmental cleanup solutions that are safer and more time- and cost-effective than those currently available. In many cases, the development of new technology presents the best hope for ensuring a substantive reduction in risk to the environment and improved worker/public safety within realistic financial constraints. Five major remediation and waste management problem areas have been identified to date within the DOE weapons complex;more » Contaminant Plume Containment and Remediation; Mixed Waste Characterization, Treatment, and Disposal; High-Level Waste Tank Remediation; Landfill Stabilization; and Facility Transitioning, Decommissioning, and Final Disposition. New technologies to address these problem areas are demonstrated to the point that they are proven to work and that they can be transferred to the private sector end-users. This bibliography contains information on scientific and technical reports sponsored by the Office of Environmental Management from its inception in 1989 through June 1994. Future issues contain reports from Technology Development activities and will be published biannually.« less

  2. Scaling production and improving efficiency in DEA: an interactive approach

    NASA Astrophysics Data System (ADS)

    Rödder, Wilhelm; Kleine, Andreas; Dellnitz, Andreas

    2017-10-01

    DEA models help a DMU to detect its (in-)efficiency and to improve activities, if necessary. Efficiency is only one economic aim for a decision-maker; however, up- or downsizing might be a second one. Improving efficiency is the main topic in DEA; the long-term strategy towards the right production size should attract our attention as well. Not always the management of a DMU primarily focuses on technical efficiency but rather is interested in gaining scale effects. In this paper, a formula for returns to scale (RTS) is developed, and this formula is even applicable for interior points of technology. Particularly, technical and scale inefficient DMUs need sophisticated instruments to improve their situation. Considering RTS as well as efficiency, in this paper, we give an advice for each DMU to find an economically reliable path from its actual situation to better activities and finally to most productive scale size (mpss), perhaps. For realizing this path, we propose an interactive algorithm, thus harmonizing the scientific findings and the interests of the management. Small numerical examples illustrate such paths for selected DMUs; an empirical application in theatre management completes the contribution.

  3. Type A Accident Investigation Board report on the January 17, 1996, electrical accident with injury in Technical Area 21 Tritium Science and Fabrication Facility Los Alamos National Laboratory. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-04-01

    An electrical accident was investigated in which a crafts person received serious injuries as a result of coming into contact with a 13.2 kilovolt (kV) electrical cable in the basement of Building 209 in Technical Area 21 (TA-21-209) in the Tritium Science and Fabrication Facility (TSFF) at Los Alamos National Laboratory (LANL). In conducting its investigation, the Accident Investigation Board used various analytical techniques, including events and causal factor analysis, barrier analysis, change analysis, fault tree analysis, materials analysis, and root cause analysis. The board inspected the accident site, reviewed events surrounding the accident, conducted extensive interviews and document reviews,more » and performed causation analyses to determine the factors that contributed to the accident, including any management system deficiencies. Relevant management systems and factors that could have contributed to the accident were evaluated in accordance with the guiding principles of safety management identified by the Secretary of Energy in an October 1994 letter to the Defense Nuclear Facilities Safety Board and subsequently to Congress.« less

  4. [NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 3:] Technical communications in aeronautics: Results of an exploratory study. An analysis of profit managers' and nonprofit managers' responses

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Glassman, Myron; Barclay, Rebecca O.; Oliu, Walter E.

    1989-01-01

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that profit and nonprofit managers in the aerospace community have different technical communications practices. Five assumptions were established for the analysis. Profit and nonprofit managers in the aerospace community were found to have different technical communications practices for one of the five assumptions tested. It was, therefore, concluded that profit and nonprofit managers in the aerospace community do not have different technical communications practices.

  5. Digital Aquifer - Integrating modeling, technical, software and policy aspects to develop a groundwater management tool

    NASA Astrophysics Data System (ADS)

    Tirupathi, S.; McKenna, S. A.; Fleming, K.; Wambua, M.; Waweru, P.; Ondula, E.

    2016-12-01

    Groundwater management has traditionally been observed as a study for long term policy measures to ensure that the water resource is sustainable. IBM Research, in association with the World Bank, extended this traditional analysis to include realtime groundwater management by building a context-aware, water rights management and permitting system. As part of this effort, one of the primary objectives was to develop a groundwater flow model that can help the policy makers with a visual overview of the current groundwater distribution. In addition, the system helps the policy makers simulate a range of scenarios and check the sustainability of the groundwater resource in a given region. The system also enables a license provider to check the effect of the introduction of a new well on the existing wells in the domain as well as the groundwater resource in general. This process simplifies how an engineer will determine if a new well should be approved. Distance to the nearest well neighbors and the maximum decreases in water levels of nearby wells are continually assessed and presented as evidence for an engineer to make the final judgment on approving the permit. The system also facilitates updated insights on the amount of groundwater left in an area and provides advice on how water fees should be structured to balance conservation and economic development goals. In this talk, we will discuss the concept of Digital Aquifer, the challenges in integrating modeling, technical and software aspects to develop a management system that helps policy makers and license providers with a robust decision making tool. We will concentrate on the groundwater model developed using the analytic element method that plays a very important role in the decision making aspects. Finally, the efficiency of this system and methodology is shown through a case study in Laguna Province, Philippines, which was done in collaboration with the National Water Resource Board, Philippines and World Bank.

  6. 13 CFR 124.704 - What additional management and technical assistance is reserved exclusively for concerns eligible...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What additional management and.../SMALL DISADVANTAGED BUSINESS STATUS DETERMINATIONS 8(a) Business Development Management and Technical... management and technical assistance through its service providers exclusively to small business concerns...

  7. AIMES Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Katz, Daniel S; Jha, Shantenu; Weissman, Jon

    2017-01-31

    This is the final technical report for the AIMES project. Many important advances in science and engineering are due to large-scale distributed computing. Notwithstanding this reliance, we are still learning how to design and deploy large-scale production Distributed Computing Infrastructures (DCI). This is evidenced by missing design principles for DCI, and an absence of generally acceptable and usable distributed computing abstractions. The AIMES project was conceived against this backdrop, following on the heels of a comprehensive survey of scientific distributed applications. AIMES laid the foundations to address the tripartite challenge of dynamic resource management, integrating information, and portable and interoperablemore » distributed applications. Four abstractions were defined and implemented: skeleton, resource bundle, pilot, and execution strategy. The four abstractions were implemented into software modules and then aggregated into the AIMES middleware. This middleware successfully integrates information across the application layer (skeletons) and resource layer (Bundles), derives a suitable execution strategy for the given skeleton and enacts its execution by means of pilots on one or more resources, depending on the application requirements, and resource availabilities and capabilities.« less

  8. AIMES Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weissman, Jon; Katz, Dan; Jha, Shantenu

    2017-01-31

    This is the final technical report for the AIMES project. Many important advances in science and engineering are due to large scale distributed computing. Notwithstanding this reliance, we are still learning how to design and deploy large-scale production Distributed Computing Infrastructures (DCI). This is evidenced by missing design principles for DCI, and an absence of generally acceptable and usable distributed computing abstractions. The AIMES project was conceived against this backdrop, following on the heels of a comprehensive survey of scientific distributed applications. AIMES laid the foundations to address the tripartite challenge of dynamic resource management, integrating information, and portable andmore » interoperable distributed applications. Four abstractions were defined and implemented: skeleton, resource bundle, pilot, and execution strategy. The four abstractions were implemented into software modules and then aggregated into the AIMES middleware. This middleware successfully integrates information across the application layer (skeletons) and resource layer (Bundles), derives a suitable execution strategy for the given skeleton and enacts its execution by means of pilots on one or more resources, depending on the application requirements, and resource availabilities and capabilities.« less

  9. TECHNICAL AND REGULATORY CONSIDERATIONS IN USING FREIGHT CONTAINERS AS INDUSTRIAL PACKAGES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Opperman, E; Mark Hawk, M; Ron Natali, R

    2007-10-16

    The United States (US) Department of Energy (DOE), Office of Environmental Management (EM), is actively pursuing activities to reduce the radiological risk and clean up the environmental legacy of the nation's nuclear weapons programs. EM has made significant progress in recent years in the clean-up and closure of sites and is also focusing on longer-term activities necessary for the completion of the clean-up program. The packaging and transportation of contaminated demolition debris and low-level waste (LLW) materials in a safe and cost-effective manner are essential in completing this mission. Toward this end, the US Department of Transportation's (DOT) Final Rulemore » on Hazardous Materials Regulation Final Rule issued January 26, 2004, included a new provision authorizing the use of Freight Containers (e.g., 20 and 40-foot ISO Containers) as Industrial Packages Type 1, 2, or 3 (IP-1, IP-2, and IP-3). This paper will discuss the technical and regulatory considerations in using these newly authorized and large packages for the packaging and transportation of LLW materials.« less

  10. Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

  11. [NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 2:] Technical communications in aeronautics: Results of an exploratory study. An analysis of managers' and nonmanagers' responses

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Glassman, Myron; Barclay, Rebecca O.; Oliu, Walter E.

    1989-01-01

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that aerospace managers and nonmanagers have different technical communications practices. Five assumptions were established for the analysis. Aerospace managers and nonmanagers were found to have different technical communications practices for three of the five assumptions tested. Although aerospace managers and nonmanagers were found to have different technical communications practices, the evidence was neither conclusive nor compelling that the presumption of difference in practices could be attributed to the duties performed by aerospace managers and nonmanagers.

  12. Multi-Task Project to Provide Research Support for Human Research and Engineering Goals Identified by the Army

    DTIC Science & Technology

    2009-06-01

    Jefferson City, MO Phone:573-681-5126 E-mail: rooneyi(a>lincolnu.edu Principle Investigators for contract’s 5 Task Areas: Task I : James Rooney...identified Tasks all structured within a single contract. This contract contained Five Task areas: Task I was an administrative task; Task II-V were...Manager’s Overview of the Report (Task I ) 3. Summary Final Budget Invoice and Budget unspent balance 4. Technical Reports of the Research Tasks (II - V

  13. Contamination Assessment Report, Site 26-6: Basin F. Version 3.3. Phase 1

    DTIC Science & Technology

    1988-05-01

    88173R02 AD-A2 7 5 700 -’ lEtUIUI LITIGATION TECHNICAL SUPPORT AND SERVICES Rocky Mountain Arsenal DTIC r ELECTF- FINAL PHASE I Q FEB7 1994...PREPARED BY ENVIRONMENTAL SCIENCE AND ENGINEERING, INC. Harding Lawson Associates Midwest Research Institute (Prepared under Task 19) Rocky- Mountain ...Arspn• FILE COP y Information Center PREPARED FOR Commerce City, Colorad U.S. ARMY PROGRAM MANAGER’S OFFICE FOR ROCKY MOUNTAIN ARSENAL THE INFORMATION

  14. 77 FR 50589 - Agreements and Memoranda of Understanding Between the Food and Drug Administration and Other...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ...: Final rule. SUMMARY: This final rule makes technical changes that will update a requirement that many of the written agreements and memoranda of understanding (MOUs) between the Food and Drug Administration.... This final rule, accordingly, eliminates it. We are making these technical changes to conserve Agency...

  15. 77 FR 30514 - Native Hawaiian Career and Technical Education Program; Final Waiver and Extension of Project Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native Hawaiian Career and Technical Education Program; Final Waiver and.... ACTION: Notice. Overview Information Final Waiver and Extension of Project Period for the Native Hawaiian.... SUMMARY: For 36-month projects funded in fiscal year (FY) 2009 under the Native Hawaiian Career and...

  16. 48 CFR 215.404-71-2 - Performance risk.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...—the technical uncertainties of performance. (2) Management/cost control—the degree of management... Technical (1) (2) N/A N/A 22 Management/Cost Control (1) (2) N/A N/A 23 Performance Risk (Composite) N/A (3...(percent) Assignedvalue (percent) Weightedvalue (percent) Technical 60 5.0 3.0 Management/Cost Control 40 4...

  17. Hazardous and toxic waste management in Botswana: practices and challenges.

    PubMed

    Mmereki, Daniel; Li, Baizhan; Meng, Liu

    2014-12-01

    Hazardous and toxic waste is a complex waste category because of its inherent chemical and physical characteristics. It demands for environmentally sound technologies and know-how as well as clean technologies that simultaneously manage and dispose it in an environmentally friendly way. Nevertheless, Botswana lacks a system covering all the critical steps from importation to final disposal or processing of hazardous and toxic waste owing to limited follow-up of the sources and types of hazardous and toxic waste, lack of modern and specialised treatment/disposal facilities, technical know-how, technically skilled manpower, funds and capabilities of local institutions to take lead in waste management. Therefore, because of a lack of an integrated system, there are challenges such as lack of cooperation among all the stakeholders about the safe management of hazardous and toxic waste. Furthermore, Botswana does not have a systematic regulatory framework regarding monitoring and hazardous and toxic waste management. In addition to the absence of a systematic regulatory framework, inadequate public awareness and dissemination of information about hazardous and toxic waste management, slower progress to phase-out persistent and bio-accumulative waste, and lack of reliable and accurate information on hazardous and toxic waste generation, sources and composition have caused critical challenges to effective hazardous and toxic waste management. It is, therefore, important to examine the status of hazardous and toxic waste as a waste stream in Botswana. By default; this mini-review article presents an overview of the current status of hazardous and toxic waste management and introduces the main challenges in hazardous and toxic waste management. Moreover, the article proposes the best applicable strategies to achieve effective hazardous and toxic waste management in the future. © The Author(s) 2014.

  18. Bibliography--Unclassified Technical Reports, Special Reports, and Technical Notes: FY 1982.

    DTIC Science & Technology

    1982-11-01

    in each category are listed in chronological order under seven areas: manpower management, personnel administration , organization management, education...7633). Technical reports listed that have unlimited distribution can also be obtained from the National Technical Information Service , 5285 Port Royal...simulations of manpower systems. This research exploits the technology of computer-managed large-scale data bases. PERSONNEL ADMINISTRATION The personnel

  19. Influence of technical maintenance measures on ecological status of agricultural lowland rivers - Systematic review and implications for river management.

    PubMed

    Bączyk, Anna; Wagner, Maciej; Okruszko, Tomasz; Grygoruk, Mateusz

    2018-06-15

    Intensification of agriculture and ongoing urban sprawl exacerbate pressures on rivers. Small rivers in agricultural landscapes are especially exposed to excessive technical actions implemented in order to allow for harvesting river water for irrigation, draining agricultural water and receiving sewage. Regular dredging and macrophyte removal strongly interfere with the global need for preserving river biodiversity that allows agricultural lowland rivers to remain refuges for a variety of species, and-accordingly-to keep water bodies resilient for the benefit of society. In order to provide a comprehensive look at the influence of agricultural lowland river management on the ecological status of these water bodies, we conducted a literature review and a meta-analysis. For the structured literature review we selected 203 papers reflecting on the response of aquatic ecosystems to dredging and macrophyte management actions. The database of scientific contributions developed for our study consists of papers written by the authors from 33 countries (first authorship) addressing dredging, macrophyte removal, status of fish and macroinvertebrates as well as the general ecological status of lowland agricultural rivers. We revealed that 96% of the analyzed papers indicated unilateral, negative responses of aquatic ecosystems, particularly macroinvertebrates, ichthyofauna and macrophyte composition, to maintenance measures. We revealed that studies conducted in the European Union on the ecological status of rivers appeared to significantly increase in quantity after the implementation of the Water Framework Directive. Finally, we concluded that day-to-day management of lowland agricultural rivers requires revision in terms of compliance with environmental conservation requirements and the recurrent implementation of technical measures for river maintenance. Copyright © 2018 Elsevier B.V. All rights reserved.

  20. Air/Superfund national technical guidance study series, Volume 2. Estimation of baseline air emission at Superfund sites. Interim report(Final)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    This volume is one in a series of manuals prepared for EPA to assist its Remedial Project Managers in the assessment of the air contaminant pathway and developing input data for risk assessment. The manual provides guidance on developing baseline-emission estimates from hazardous waste sites. Baseline-emission estimates (BEEs) are defined as emission rates estimated for a site in its undisturbed state. Specifically, the manual is intended to: Present a protocol for selecting the appropriate level of effort to characterize baseline air emissions; Assist site managers in designing an approach for BEEs; Describe useful technologies for developing site-specific baseline emission estimatesmore » (BEEs); Help site managers select the appropriate technologies for generating site-specific BEEs.« less

  1. Rapid Development: A Content Analysis Comparison of Literature and Purposive Sampling of AFRL Rapid Reaction Projects

    DTIC Science & Technology

    2011-12-01

    systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical

  2. 78 FR 70586 - Technical Support Document: Technical Update of the Social Cost of Carbon for Regulatory Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... OFFICE OF MANAGEMENT AND BUDGET Technical Support Document: Technical Update of the Social Cost of... Budget, Executive Office of the President. ACTION: Notice of availability and request for comments. SUMMARY: The Office of Management and Budget (OMB) requests comments on the Technical Support Document...

  3. 2005 v4.3 Technical Support Document

    EPA Pesticide Factsheets

    Emissions Modeling for the Final Mercury and Air Toxics Standards Technical Support Document describes how updated 2005 NEI, version 2 emissions were processed for air quality modeling in support of the final Mercury and Air Toxics Standards (MATS).

  4. Utilisation of inorganic salts in fungal crop disease management in the U.K.

    PubMed

    Deliopoulos, T; Kettlewell, P S; Hare, M C

    2009-01-01

    The overaLl aim of the study described in this communication was to utilise the findings of a global scientific and technical literature survey on the use of inorganic salts against crop fungal diseases in order to assess the potential of using these substances to reduce the reliance of UK growers on conventional fungicides. A summary of the main findings of the Literature survey is provided followed by information on the current commercial use of inorganic salt-based products in fungal disease management. Finally, the scope of potential use of inorganic salts on high disease risk crops in the UK is assessed and specific crop/pathogen combinations are prioritised for further research.

  5. What Do Experienced Water Managers Think of Water Resources of Our Nation and Its Management Infrastructure?

    PubMed

    Hossain, Faisal; Arnold, Jeffrey; Beighley, Ed; Brown, Casey; Burian, Steve; Chen, Ji; Mitra, Anindita; Niyogi, Dev; Pielke, Roger; Tidwell, Vincent; Wegner, Dave

    2015-01-01

    This article represents the second report by an ASCE Task Committee "Infrastructure Impacts of Landscape-driven Weather Change" under the ASCE Watershed Management Technical Committee and the ASCE Hydroclimate Technical Committee. Herein, the 'infrastructure impacts" are referred to as infrastructure-sensitive changes in weather and climate patterns (extremes and non-extremes) that are modulated, among other factors, by changes in landscape, land use and land cover change. In this first report, the article argued for explicitly considering the well-established feedbacks triggered by infrastructure systems to the land-atmosphere system via landscape change. In this report by the ASCE Task Committee (TC), we present the results of this ASCE TC's survey of a cross section of experienced water managers using a set of carefully crafted questions. These questions covered water resources management, infrastructure resiliency and recommendations for inclusion in education and curriculum. We describe here the specifics of the survey and the results obtained in the form of statistical averages on the 'perception' of these managers. Finally, we discuss what these 'perception' averages may indicate to the ASCE TC and community as a whole for stewardship of the civil engineering profession. The survey and the responses gathered are not exhaustive nor do they represent the ASCE-endorsed viewpoint. However, the survey provides a critical first step to developing the framework of a research and education plan for ASCE. Given the Water Resources Reform and Development Act passed in 2014, we must now take into account the perceived concerns of the water management community.

  6. What Do Experienced Water Managers Think of Water Resources of Our Nation and Its Management Infrastructure?

    PubMed Central

    Hossain, Faisal; Arnold, Jeffrey; Beighley, Ed; Brown, Casey; Burian, Steve; Chen, Ji; Mitra, Anindita; Niyogi, Dev; Pielke, Roger; Tidwell, Vincent; Wegner, Dave

    2015-01-01

    This article represents the second report by an ASCE Task Committee “Infrastructure Impacts of Landscape-driven Weather Change” under the ASCE Watershed Management Technical Committee and the ASCE Hydroclimate Technical Committee. Herein, the ‘infrastructure impacts” are referred to as infrastructure-sensitive changes in weather and climate patterns (extremes and non-extremes) that are modulated, among other factors, by changes in landscape, land use and land cover change. In this first report, the article argued for explicitly considering the well-established feedbacks triggered by infrastructure systems to the land-atmosphere system via landscape change. In this report by the ASCE Task Committee (TC), we present the results of this ASCE TC’s survey of a cross section of experienced water managers using a set of carefully crafted questions. These questions covered water resources management, infrastructure resiliency and recommendations for inclusion in education and curriculum. We describe here the specifics of the survey and the results obtained in the form of statistical averages on the ‘perception’ of these managers. Finally, we discuss what these ‘perception’ averages may indicate to the ASCE TC and community as a whole for stewardship of the civil engineering profession. The survey and the responses gathered are not exhaustive nor do they represent the ASCE-endorsed viewpoint. However, the survey provides a critical first step to developing the framework of a research and education plan for ASCE. Given the Water Resources Reform and Development Act passed in 2014, we must now take into account the perceived concerns of the water management community. PMID:26544045

  7. The Center for Space Telemetering and Telecommunications Systems

    NASA Technical Reports Server (NTRS)

    Horan, S.; DeLeon, P.; Borah, D.; Lyman, R.

    2003-01-01

    This report comprises the final technical report for the research grant 'Center for Space Telemetering and Telecommunications Systems' sponsored by the National Aeronautics and Space Administration's Goddard Space Flight Center. The grant activities are broken down into the following technology areas: (1) Space Protocol Testing; (2) Autonomous Reconfiguration of Ground Station Receivers; (3) Satellite Cluster Communications; and (4) Bandwidth Efficient Modulation. The grant activity produced a number of technical reports and papers that were communicated to NASA as they were generated. This final report contains the final summary papers or final technical report conclusions for each of the project areas. Additionally, the grant supported students who made progress towards their degrees while working on the research.

  8. Promotion of the Equal Access of Girls and Women to Technical and Vocational Education. Studies on Technical and Vocational Education 7.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    This monograph includes the final report of the International Expert Meeting on the Promotion of Equal Access of Girls and Women to Technical and Vocational Education (TVE) held in Seoul, Republic of Korea, and country discussion papers. The final report is composed of an introduction that proposes that many Member States require special measures…

  9. 48 CFR 242.7400 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contractor Facilities 242.7400 General. (a) Program managers may conclude that they need technical... manager may assign technical representatives under the procedures in 242.7401. (b) A technical representative is a representative of a DoD program, project, or system office performing non-CAS technical...

  10. 48 CFR 242.7400 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Contractor Facilities 242.7400 General. (a) Program managers may conclude that they need technical... manager may assign technical representatives under the procedures in 242.7401. (b) A technical representative is a representative of a DoD program, project, or system office performing non-CAS technical...

  11. Adaptive Management: From More Talk to Real Action

    NASA Astrophysics Data System (ADS)

    Williams, Byron K.; Brown, Eleanor D.

    2014-02-01

    The challenges currently facing resource managers are large-scale and complex, and demand new approaches to balance development and conservation goals. One approach that shows considerable promise for addressing these challenges is adaptive management, which by now is broadly seen as a natural, intuitive, and potentially effective way to address decision-making in the face of uncertainties. Yet the concept of adaptive management continues to evolve, and its record of success remains limited. In this article, we present an operational framework for adaptive decision-making, and describe the challenges and opportunities in applying it to real-world problems. We discuss the key elements required for adaptive decision-making, and their integration into an iterative process that highlights and distinguishes technical and social learning. We illustrate the elements and processes of the framework with some successful on-the-ground examples of natural resource management. Finally, we address some of the difficulties in applying learning-based management, and finish with a discussion of future directions and strategic challenges.

  12. Economic analysis of transmission line engineering based on industrial engineering

    NASA Astrophysics Data System (ADS)

    Li, Yixuan

    2017-05-01

    The modern industrial engineering is applied to the technical analysis and cost analysis of power transmission and transformation engineering. It can effectively reduce the cost of investment. First, the power transmission project is economically analyzed. Based on the feasibility study of power transmission and transformation project investment, the proposal on the company system cost management is put forward through the economic analysis of the effect of the system. The cost management system is optimized. Then, through the cost analysis of power transmission and transformation project, the new situation caused by the cost of construction is found. It is of guiding significance to further improve the cost management of power transmission and transformation project. Finally, according to the present situation of current power transmission project cost management, concrete measures to reduce the cost of power transmission project are given from the two aspects of system optimization and technology optimization.

  13. (Low-level waste disposal facility siting and site characterization)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mezga, L.J.; Ketelle, R.H.; Pin, F.G.

    A US team consisting of representatives of Oak Ridge National Laboratory (ORNL), Savannah River Plant (SRP), Savannah river Laboratory (SRL), and the Department of Energy Office of Defense Waste and Byproducts Management participated in the fourth meeting held under the US/French Radioactive Waste Management Agreement between the US Department of Energy and the Commissariat a l'Energie Atomique. This meeting, held at Agence Nationale pour les Gestion des Dechets Radioactifs' (ANDRA's) Headquarters in Paris, was a detailed, technical topical workshop focusing on Low-Level Waste Disposal Facility Siting and Site Characterization.'' The meeting also included a visit to the Centre de lamore » Manche waste management facility operated by ANDRA to discuss and observe the French approach to low-level waste management. The final day of the meeting was spent at the offices of Societe Generale pour les Techniques Nouvelles (SGN) discussing potential areas of future cooperation and exchange. 20 figs.« less

  14. Air Quality Modeling Technical Support Document for the Final Cross State Air Pollution Rule Update

    EPA Pesticide Factsheets

    In this technical support document (TSD) we describe the air quality modeling performed to support the final Cross State Air Pollution Rule for the 2008 ozone National Ambient Air Quality Standards (NAAQS).

  15. 7 CFR 614.7 - Preliminary technical determinations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Preliminary technical determinations. 614.7 Section... Preliminary technical determinations. (a) A preliminary technical determination becomes final 30 days after... purpose of gathering additional information and discussing the facts relating to the preliminary technical...

  16. The Role of Formal Education, Technical and Management Training on Information Systems (IS) Managers' Managerial Effectiveness as Perceived by Their Subordinates

    ERIC Educational Resources Information Center

    Ligon, Jerry; Abdullah, ABM; Talukder, Majharul

    2007-01-01

    This study examined the relationship between Information Systems (IS) managers' formal education, level of technical and managerial training and their managerial effectiveness as perceived by their subordinates. The study finds that there is a strong positive relationship between the amount of technical training IS managers have received and their…

  17. Lunar Prospector: First Results and Lessons Learned

    NASA Astrophysics Data System (ADS)

    Scott Hubbard, G.; Feldman, William; Cox, Sylvia A.; Smith, Marcie A.; Chu-Thielbar, Lisa

    2002-01-01

    Lunar Prospector, the first competitively selected mission in NASA's Discovery Program, is conducting a one-year orbital survey of the Moon's composition and structure. Launched on January 6 1998, the suite of five instruments is measuring water/ice to a sensitivity of 50 ppm (hydrogen), detecting key elemental constituents, gas release events and mapping the Moon's gravitational and magnetic fields. The mission is described with emphasis on the first scientific results and lessons learned from managing a very low cost project. A mission overview and systems description is given along with final mission trajectories. Lessons learned from government-industry teaming, new modes of project management, and novel contractual arrangements are discussed. The suite of five instruments (neutron spectrometer, alpha particle spectrometer, gamma-ray spectrometer, electron reflectometer and magnetometer) is outlined with attention to final technical performance as well as development on a constrained budget and schedule. A review of our novel approaches to education and public outreach is discussed and a summary with suggestions and implications for future missions is provided.

  18. Technical Communication, Knowledge Management, and XML.

    ERIC Educational Resources Information Center

    Applen, J. D.

    2002-01-01

    Describes how technical communicators can become involved in knowledge management. Examines how technical communicators can teach organizations to design, access, and contribute to databases; alert them to new information; and facilitate trust and sharing. Concludes that successful technical communicators would do well to establish a culture that…

  19. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  20. Automatic River Network Extraction from LIDAR Data

    NASA Astrophysics Data System (ADS)

    Maderal, E. N.; Valcarcel, N.; Delgado, J.; Sevilla, C.; Ojeda, J. C.

    2016-06-01

    National Geographic Institute of Spain (IGN-ES) has launched a new production system for automatic river network extraction for the Geospatial Reference Information (GRI) within hydrography theme. The goal is to get an accurate and updated river network, automatically extracted as possible. For this, IGN-ES has full LiDAR coverage for the whole Spanish territory with a density of 0.5 points per square meter. To implement this work, it has been validated the technical feasibility, developed a methodology to automate each production phase: hydrological terrain models generation with 2 meter grid size and river network extraction combining hydrographic criteria (topographic network) and hydrological criteria (flow accumulation river network), and finally the production was launched. The key points of this work has been managing a big data environment, more than 160,000 Lidar data files, the infrastructure to store (up to 40 Tb between results and intermediate files), and process; using local virtualization and the Amazon Web Service (AWS), which allowed to obtain this automatic production within 6 months, it also has been important the software stability (TerraScan-TerraSolid, GlobalMapper-Blue Marble , FME-Safe, ArcGIS-Esri) and finally, the human resources managing. The results of this production has been an accurate automatic river network extraction for the whole country with a significant improvement for the altimetric component of the 3D linear vector. This article presents the technical feasibility, the production methodology, the automatic river network extraction production and its advantages over traditional vector extraction systems.

  1. Report of the Peer Review Panel on the early site suitability evaluation of the Potential Repository Site at Yucca Mountain, Nevada; Yucca Mountain Site Characterization Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-01-01

    The US Department of Energy (DOE) Yucca mountain Site Characterization Project Office (YMPO) assigned Science Applications International Corporation (SAIC), the Technical and Management Support Services (T&MSS) contractor to the YmPo, the task of conducting an Early Site Suitability Evaluation (ESSE) of the Yucca mountain site as a potential site for a high-level radioactive waste repository. First, the assignment called for the development of a method to evaluate a single site against the DOE General Guidelines for Recommendation of Sites for Nuclear Waste Repositories, 10 CFR Part 960. Then, using this method, an evaluation team, the ESSE Core Team, of seniormore » YMP scientists, engineers, and technical experts, evaluated new information obtained about the site since publication of the final Environmental Assessment (DOE, 1986) to determine if new suitability/unsuitability findings could be recommended. Finally, the Core Team identified further information and analyses needed to make final determinations for each of the guidelines. As part of the task, an independent peer review of the ESSE report has been conducted. Expertise was solicited that covered the entire spectrum of siting guidelines in 10 CFR Part 960 in order to provide a complete, in-depth critical review of the data evaluated and cited in the ESSE report, the methods used to evaluate the data, and the conclusions and recommendations offered by the report. Fourteen nationally recognized technical experts (Table 2) served on the Peer Review Panel. The comments from the Panel and the responses prepared by the ESSE Core Team, documented on formal Comment Response Forms, constitute the body of this document.« less

  2. 25 CFR 286.11 - Management and technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Management and technical assistance. 286.11 Section 286.11 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ECONOMIC ENTERPRISES INDIAN BUSINESS DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making...

  3. Programs of Study as a State Policy Mandate: A Longitudinal Study of the South Carolina Personal Pathways to Success Initiative. Final Technical Report: Major Findings and Implications

    ERIC Educational Resources Information Center

    Hammond, Cathy; Drew, Sam F.; Withington, Cairen; Griffith, Cathy; Swiger, Caroline M.; Mobley, Catherine; Sharp, Julia L.; Stringfield, Samuel C.; Stipanovic, Natalie; Daugherty, Lindsay

    2013-01-01

    This is the final technical report from the National Research Center for Career and Technical Education's (NRCCTE's) five-year longitudinal study of South Carolina's Personal Pathway to Success initiative, which was authorized by the state's Education and Economic Development Act (EEDA) in 2005. NRCCTE-affiliated researchers at the National…

  4. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  5. ERISTAR: Earth Resources Information Storage, Transformation, Analysis, and Retrieval administrative report

    NASA Technical Reports Server (NTRS)

    Vachon, R. I.; Obrien, J. F., Jr.; Lueg, R. E.; Cox, J. E.

    1972-01-01

    The 1972 Systems Engineering program at Marshall Space Flight Center where 15 participants representing 15 U.S. universities, 1 NASA/MSFC employee, and another specially assigned faculty member, participated in an 11-week program is discussed. The Fellows became acquainted with the philosophy of systems engineering, and as a training exercise, used this approach to produce a conceptional design for an Earth Resources Information Storage, Transformation, Analysis, and Retrieval System. The program was conducted in three phases; approximately 3 weeks were devoted to seminars, tours, and other presentations to subject the participants to technical and other aspects of the information management problem. The second phase, 5 weeks in length, consisted of evaluating alternative solutions to problems, effecting initial trade-offs and performing preliminary design studies and analyses. The last 3 weeks were occupied with final trade-off sessions, final design analyses and preparation of a final report and oral presentation.

  6. Direct Final Rule: Nonroad Diesel Technical Amendments and Tier 3 Technical Relief Provision

    EPA Pesticide Factsheets

    Rule making certain technical corrections to the rules establishing emission standards for nonroad diesel engines and amending those rules to provide manufacturers with a production technical relief provision for Tier 3 equipment.

  7. The Limpopo Non-Metropolitan Drinking Water Supplier Response to a Diagnostic Tool for Technical Compliance

    PubMed Central

    Nefale, Avhashoni D.; Kamika, Ilunga; Obi, Chikwelu L.

    2017-01-01

    Water services providers should supply water that is fit for human consumption, taking into account multi-barrier approaches and technical aspects such as design aspects, operation monitoring, final water quality compliance monitoring, plant monitoring practices, maintenance, and risk management practices. Against this background, this study focused on applying the diagnostic tool for technical compliance as well as assessing the compliance of water treatment plants with management norms. Six plants in the Vhembe District Municipality were selected; the Vondo, Malamulele, Mutshedzi, and Mutale plants (conventional), and the Dzingahe and Tshedza package plants. During the first assessment, four (Malamulele, Mutshedzi, Mutale and Dzingahe) plants scored between 44% and 49% and achieved Class 3 certification, revealing serious challenges requiring immediate intervention. Two water plants (Vondo and Tshedza, scoring 53% and 63%, respectively) were in the Class 2 category, revealing serious challenges requiring attention and improvement. During the second assessment, all plants scored between 63% and 87% (Class 2 category). The greatest improvement (30%) was noted for the Dzingahe and Tshedza plants, followed by the Malamulele plant, while the Mutale, Vondo, and Mutshedzi plants improved their scores by 20%, 17% and 14%, respectively. After corrective actions and re-measurement, no plant complied. It is recommended that Water Services Providers (WSPs) regularly apply the diagnostic tools and water safety plans as developed in order to comply with applicable standards. PMID:28753964

  8. Extending systems ergonomics thinking to accommodate the socio-technical issues of Systems of Systems.

    PubMed

    Siemieniuch, C E; Sinclair, M A

    2014-01-01

    Socio-technical issues for Systems of Systems (SoS) differ in several ways from those for systems, mainly because the individual systems that are components of the SoS are usually owned by different organisations, each responsible for the optimisation and operation of its own system. Consequently, management of the SoS is about negotiation and management of the interfaces. Because of issues of Intellectual Property Rights (IPRs), commercial confidence, and the like, there is seldom sufficient, timely information in circulation about the SoS. Surprises are endemic to SoS, and resilience is a fundamental requirement. This paper outlines the different characteristics of SoS compared to ordinary systems, discusses many of the socio-technical issues involved, and then outlines a generic approach to these issues, treating the SoS as a 'wicked problem'. Endemic to this is the need for governance, which is discussed briefly. This is followed by a description of the evident gaps in knowledge about the functioning of SoS, and a listing of tool classes, the development of which would enable progress to be made more effectively. Finally, the paper discusses how the SoS approach might be the best way to entrain ICT to address global drivers, thus pointing to the importance of the SoS approach. Copyright © 2013 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  9. The Limpopo Non-Metropolitan Drinking Water Supplier Response to a Diagnostic Tool for Technical Compliance.

    PubMed

    Nefale, Avhashoni D; Kamika, Ilunga; Obi, Chikwelu L; Momba, Maggy Nb

    2017-07-19

    Water services providers should supply water that is fit for human consumption, taking into account multi-barrier approaches and technical aspects such as design aspects, operation monitoring, final water quality compliance monitoring, plant monitoring practices, maintenance, and risk management practices. Against this background, this study focused on applying the diagnostic tool for technical compliance as well as assessing the compliance of water treatment plants with management norms. Six plants in the Vhembe District Municipality were selected; the Vondo, Malamulele, Mutshedzi, and Mutale plants (conventional), and the Dzingahe and Tshedza package plants. During the first assessment, four (Malamulele, Mutshedzi, Mutale and Dzingahe) plants scored between 44% and 49% and achieved Class 3 certification, revealing serious challenges requiring immediate intervention. Two water plants (Vondo and Tshedza, scoring 53% and 63%, respectively) were in the Class 2 category, revealing serious challenges requiring attention and improvement. During the second assessment, all plants scored between 63% and 87% (Class 2 category). The greatest improvement (30%) was noted for the Dzingahe and Tshedza plants, followed by the Malamulele plant, while the Mutale, Vondo, and Mutshedzi plants improved their scores by 20%, 17% and 14%, respectively. After corrective actions and re-measurement, no plant complied. It is recommended that Water Services Providers (WSPs) regularly apply the diagnostic tools and water safety plans as developed in order to comply with applicable standards.

  10. Human Factors and Ergonomics for the Dental Profession.

    PubMed

    Ross, Al

    2016-09-01

    This paper proposes that the science of Human Factors and Ergonomics (HFE) is suitable for wide application in dental education, training and practice to improve safety, quality and efficiency. Three areas of interest are highlighted. First it is proposed that individual and team Non-Technical Skills (NTS), such as communication, leadership and stress management can improve error rates and efficiency of procedures. Secondly, in a physically and technically challenging environment, staff can benefit from ergonomic principles which examine design in supporting safe work. Finally, examination of organizational human factors can help anticipate stressors and plan for flexible responses to multiple, variable demands, and fluctuating resources. Clinical relevance: HFE is an evidence-based approach to reducing error rates and procedural complications, and avoiding problems associated with stress and fatigue. Improved teamwork and organizational planning and efficiency can impact directly on patient outcomes.

  11. A review of fractional-order techniques applied to lithium-ion batteries, lead-acid batteries, and supercapacitors

    NASA Astrophysics Data System (ADS)

    Zou, Changfu; Zhang, Lei; Hu, Xiaosong; Wang, Zhenpo; Wik, Torsten; Pecht, Michael

    2018-06-01

    Electrochemical energy storage systems play an important role in diverse applications, such as electrified transportation and integration of renewable energy with the electrical grid. To facilitate model-based management for extracting full system potentials, proper mathematical models are imperative. Due to extra degrees of freedom brought by differentiation derivatives, fractional-order models may be able to better describe the dynamic behaviors of electrochemical systems. This paper provides a critical overview of fractional-order techniques for managing lithium-ion batteries, lead-acid batteries, and supercapacitors. Starting with the basic concepts and technical tools from fractional-order calculus, the modeling principles for these energy systems are presented by identifying disperse dynamic processes and using electrochemical impedance spectroscopy. Available battery/supercapacitor models are comprehensively reviewed, and the advantages of fractional types are discussed. Two case studies demonstrate the accuracy and computational efficiency of fractional-order models. These models offer 15-30% higher accuracy than their integer-order analogues, but have reasonable complexity. Consequently, fractional-order models can be good candidates for the development of advanced battery/supercapacitor management systems. Finally, the main technical challenges facing electrochemical energy storage system modeling, state estimation, and control in the fractional-order domain, as well as future research directions, are highlighted.

  12. Proceedings-1979 third annual practical conference on communication

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    Topics covered at the meeting include: nonacademic writing, writer and editor training in technical publications, readability of technical documents, guide for beginning technical editors, a visual aids data base, newsletter publishing, style guide for a project management organization, word processing, computer graphics, text management for technical documentation, and typographical terminology.

  13. Development of a decision aid for energy resource management for the Navajo Nation incorporating environmental cultural values

    NASA Astrophysics Data System (ADS)

    Necefer, Len Edward

    Decision-making surrounding pathways of future energy resource management are complexity and requires balancing tradeoffs of multiple environmental, social, economic, and technical outcomes. Technical decision aid can provide a framework for informed decision making, allowing individuals to better understand the tradeoff between resources, technology, energy services, and prices. While technical decision aid have made significant advances in evaluating these quantitative aspects of energy planning and performance, they have not been designed to incorporate human factors, such as preferences and behavior that are informed by cultural values. Incorporating cultural values into decision tools can provide not only an improved decision framework for the Navajo Nation, but also generate new insights on how these perspective can improve decision making on energy resources. Ensuring these aids are a cultural fit for each context has the potential to increase trust and promote understanding of the tradeoffs involved in energy resource management. In this dissertation I present the development of a technical tool that explicitly addresses cultural and spiritual values and experimentally assesses their influence on the preferences and decision making of Navajo citizens. Chapter 2 describes the results of a public elicitation effort to gather information about stakeholder views and concerns related to energy development in the Navajo Nation in order to develop a larger sample survey and a decision-support tool that links techno-economic energy models with sociocultural attributes. Chapter 3 details the methods of developing the energy decision aid and its underlying assumptions for alternative energy projects and their impacts. This tool also provides an alternative to economic valuation of cultural impacts based upon an ordinal index tied to environmental impacts. Chapter 4 details the the influence of various cultural, environmental, and economic outcome information provided through the developed decision aid on beliefs and preferences related to the type and scale of energy development, trust of decision makers, and larger concern for environmental protection. Finally, chapter 5 presents concluding thoughts future research and on how technical-social decision tools can provide a means ensuring effective decision making on the Navajo Nation and other American Indian communities.

  14. Arizona Deafblind Project, 1995-1999. Final Report.

    ERIC Educational Resources Information Center

    Arizona State School for the Deaf and Blind, Tucson.

    This final report describes accomplishments of the four-year federally funded Arizona Deafblind Project which attempted to: (1) identify all deafblind children in Arizona; (2) deliver technical assistance to families; (3) deliver technical assistance to service providers; and (4) enhance community oversight, coordination, and collaboration with…

  15. Integrating natural and social science perspectives on plant disease risk, management and policy formulation

    PubMed Central

    Mills, Peter; Dehnen-Schmutz, Katharina; Ilbery, Brian; Jeger, Mike; Jones, Glyn; Little, Ruth; MacLeod, Alan; Parker, Steve; Pautasso, Marco; Pietravalle, Stephane; Maye, Damian

    2011-01-01

    Plant diseases threaten both food security and the botanical diversity of natural ecosystems. Substantial research effort is focused on pathogen detection and control, with detailed risk management available for many plant diseases. Risk can be assessed using analytical techniques that account for disease pressure both spatially and temporally. We suggest that such technical assessments of disease risk may not provide an adequate guide to the strategies undertaken by growers and government to manage plant disease. Instead, risk-management strategies need to account more fully for intuitive and normative responses that act to balance conflicting interests between stakeholder organizations concerned with plant diseases within the managed and natural environments. Modes of effective engagement between policy makers and stakeholders are explored in the paper, together with an assessment of such engagement in two case studies of contemporary non-indigenous diseases in one food and in one non-food sector. Finally, a model is proposed for greater integration of stakeholders in policy decisions. PMID:21624923

  16. Integrating natural and social science perspectives on plant disease risk, management and policy formulation.

    PubMed

    Mills, Peter; Dehnen-Schmutz, Katharina; Ilbery, Brian; Jeger, Mike; Jones, Glyn; Little, Ruth; MacLeod, Alan; Parker, Steve; Pautasso, Marco; Pietravalle, Stephane; Maye, Damian

    2011-07-12

    Plant diseases threaten both food security and the botanical diversity of natural ecosystems. Substantial research effort is focused on pathogen detection and control, with detailed risk management available for many plant diseases. Risk can be assessed using analytical techniques that account for disease pressure both spatially and temporally. We suggest that such technical assessments of disease risk may not provide an adequate guide to the strategies undertaken by growers and government to manage plant disease. Instead, risk-management strategies need to account more fully for intuitive and normative responses that act to balance conflicting interests between stakeholder organizations concerned with plant diseases within the managed and natural environments. Modes of effective engagement between policy makers and stakeholders are explored in the paper, together with an assessment of such engagement in two case studies of contemporary non-indigenous diseases in one food and in one non-food sector. Finally, a model is proposed for greater integration of stakeholders in policy decisions.

  17. PREFACE: 2nd International Conference on Innovative Materials, Structures and Technologies

    NASA Astrophysics Data System (ADS)

    Ručevskis, Sandris

    2015-11-01

    The 2nd International Conference on Innovative Materials, Structures and Technologies (IMST 2015) took place in Riga, Latvia from 30th September - 2nd October, 2015. The first event of the conference series, dedicated to the 150th anniversary of the Faculty of Civil Engineering of Riga Technical University, was held in 2013. Following the established tradition, the aim of the conference was to promote and discuss the latest results of industrial and academic research carried out in the following engineering fields: analysis and design of advanced structures and buildings; innovative, ecological and energy efficient building materials; maintenance, inspection and monitoring methods; construction technologies; structural management; sustainable and safe transport infrastructure; and geomatics and geotechnics. The conference provided an excellent opportunity for leading researchers, representatives of the industrial community, engineers, managers and students to share the latest achievements, discuss recent advances and highlight the current challenges. IMST 2015 attracted over 120 scientists from 24 countries. After rigorous reviewing, over 80 technical papers were accepted for publication in the conference proceedings. On behalf of the organizing committee I would like to thank all the speakers, authors, session chairs and reviewers for their efficient and timely effort. The 2nd International Conference on Innovative Materials, Structures and Technologies was organized by the Faculty of Civil Engineering of Riga Technical University with the support of the Latvia State Research Programme under the grant agreement "INNOVATIVE MATERIALS AND SMART TECHNOLOGIES FOR ENVIRONMENTAL SAFETY, IMATEH". I would like to express sincere gratitude to Juris Smirnovs, Dean of the Faculty of Civil Engineering, and Andris Chate, manager of the Latvia State Research Programme. Finally, I would like to thank all those who helped to make this event happen. Special thanks go to Diana Bajare, Laura Sele, Liga Radina and Jana Galilejeva for their major contribution to organizing the conference and to the literary editor Tatjana Smirnova and technical editor Daira Erdmane for their hard work on the conference proceedings.

  18. Life cycle management of analytical methods.

    PubMed

    Parr, Maria Kristina; Schmidt, Alexander H

    2018-01-05

    In modern process management, the life cycle concept gains more and more importance. It focusses on the total costs of the process from invest to operation and finally retirement. Also for analytical procedures an increasing interest for this concept exists in the recent years. The life cycle of an analytical method consists of design, development, validation (including instrumental qualification, continuous method performance verification and method transfer) and finally retirement of the method. It appears, that also regulatory bodies have increased their awareness on life cycle management for analytical methods. Thus, the International Council for Harmonisation of Technical Requirements for Pharmaceuticals for Human Use (ICH), as well as the United States Pharmacopeial Forum discuss the enrollment of new guidelines that include life cycle management of analytical methods. The US Pharmacopeia (USP) Validation and Verification expert panel already proposed a new General Chapter 〈1220〉 "The Analytical Procedure Lifecycle" for integration into USP. Furthermore, also in the non-regulated environment a growing interest on life cycle management is seen. Quality-by-design based method development results in increased method robustness. Thereby a decreased effort is needed for method performance verification, and post-approval changes as well as minimized risk of method related out-of-specification results. This strongly contributes to reduced costs of the method during its life cycle. Copyright © 2017 Elsevier B.V. All rights reserved.

  19. A Literature Review On Multimodal Freight Transportation Planning Under Disruptions

    NASA Astrophysics Data System (ADS)

    Rosyida, E. E.; Santosa, B.; Pujawan, I. N.

    2018-04-01

    This paper reviews publication that focuses on multimodal freight transportation planning under disruptions. In this paper, disruptions are specified by the level of the disruptions occurs and the scope of its effect. This becomes an important distinction since the cause and effect that may occur at different levels. The failure to make this distinction has implications for how we understand and manage. The reviewed papers include those that develop framework, model, and technical procedure for freight transportation. Finally, we provide an outlook of future research directions on the domain of transportation planning.

  20. Technical/ administrative options for managing tritium MCL exceedances in P-area groundwater and Steel Creek

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ross, J.

    2017-04-01

    This white paper was requested by the Core Team (United States Department of Energy [USDOE], United States Environmental Protection Agency [USEPA], and South Carolina Department of Health and Environmental Control [SCDHEC]) at the P-Area Groundwater (PAGW) Operable Unit (OU) Scoping Meeting held in January 2017 to discuss recent data and potential alternatives in support of a focused Corrective Measures Study/Feasibility Study (CMS/FS). This white paper presents an overview of the problem, and a range of technical and administrative options for addressing the tritium contamination in groundwater and Steel Creek. As tritium cannot be treated practicably, alternatives are limited to mediamore » transfer, containment and natural attenuation principally relying on radioactive decay. Using other groundwater OU decisions involving tritium as precedent, Savannah River Nuclear Solutions (SRNS) recommends that final tritium alternatives be evaluated in a CMS/FS, understanding that the likely preferred remedy will include natural attenuation with land use controls (LUCs). This is based on the inability to significantly reduce tritium impact to Steel Creek using an engineered solution as compared to natural attenuation. The timing of this evaluation could be conducted concurrently with the final remedy evaluation for volatile organic compounds (VOCs).« less

  1. Morbidly obese parturient: Challenges for the anaesthesiologist, including managing the difficult airway in obstetrics. What is new?

    PubMed Central

    Rao, Durga Prasada; Rao, Venkateswara A

    2010-01-01

    The purpose of this article is to review the fundamental aspects of obesity, pregnancy and a combination of both. The scientific aim is to understand the physiological changes, pathological clinical presentations and application of technical skills and pharmacological knowledge on this unique clinical condition. The goal of this presentation is to define the difficult airway, highlight the main reasons for difficult or failed intubation and propose a practical approach to management Throughout the review, an important component is the necessity for team work between the anaesthesiologist and the obstetrician. Certain protocols are recommended to meet the anaesthetic challenges and finally concluding with “what is new?” in obstetric anaesthesia. PMID:21224967

  2. 78 FR 70569 - Technical Mapping Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID: FEMA-2013-0039] Technical Mapping Advisory Council AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice... Technical Mapping Advisory Council (TMAC). The notice incorrectly stated that contractors and potential...

  3. Joint Common Architecture Demonstration (JCA Demo) Final Report

    DTIC Science & Technology

    2016-07-28

    approach for implementing open systems [16], formerly known as the Modular Open Systems Approach (MOSA). OSA is a business and technical strategy to... TECHNICAL REPORT RDMR-AD-16-01 JOINT COMMON ARCHITECTURE DEMONSTRATION (JCA DEMO) FINAL REPORT Scott A. Wigginton... Modular Avionics .......................................................................... 5 E. Model-Based Engineering

  4. Idaho National Laboratory Directed Research and Development FY-2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2010-03-01

    The FY 2009 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support the future DOE missions and national research priorities. LDRD is essential to the INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enhances technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development. Established by Congress in 1991, LDRD proves its benefitmore » each year through new programs, intellectual property, patents, copyrights, publications, national and international awards, and new hires from the universities and industry, which helps refresh the scientific and engineering workforce. The benefits of INL's LDRD research are many as shown in the tables below. Last year, 91 faculty members from various universities contributed to LDRD research, along with 7 post docs and 64 students. Of the total invention disclosures submitted in FY 2009, 7 are attributable to LDRD research. Sixty three refereed journal articles were accepted or published, and 93 invited presentations were attributable to LDRD research conducted in FY 2009. The LDRD Program is administered in accordance with requirements set in DOE Order 413.2B, accompanying contractor requirements, and other DOE and federal requirements invoked through the INL contract. The LDRD Program is implemented in accordance with the annual INL LDRD Program Plan, which is approved by the DOE, Nuclear Energy Program Secretarial Office. This plan outlines the method the laboratory uses to develop its research portfolio, including peer and management reviews, and the use of other INL management systems to ensure quality, financial, safety, security and environmental requirements and risks are appropriately handled. The LDRD Program is assessed annually for both output and process efficiency to ensure the investment is providing expected returns on technical capability enhancement. The call for proposals and project selection process for the INL LDRD program begins typically in April, with preliminary budget allocations, and submittal of the technical requests for preproposals. A call for preproposals is made at this time as well, and the preparation of full proposals follows in June and closes in July. The technical and management review follows this, and the portfolio is submitted for DOE-ID concurrence in early September. Project initiation is in early October. The technical review process is independent of, and in addition to the management review. These review processes are very stringent and comprehensive, ensuring technical viability and suitable technical risk are encompassed within each project that is selected for funding. Each proposal is reviewed by two or three anonymous technical peers, and the reviews are consolidated into a cohesive commentary of the overall research based on criteria published in the call for proposals. A grade is assigned to the technical review and the review comments and grade are released back to the principal investigators and the managers interested in funding the proposals. Management criteria are published in the call for proposals, and management comments and selection results are available for principal investigator and other interested management as appropriate. The DOE Idaho Operations Office performs a final review and concurs on each project prior to project authorization, and on major scope/budget changes should they occur during the project's implementation. This report begins with several research highlights that exemplify the diversity of scientific and engineering research performed at the INL in FY 2009. Progress summaries for all projects are organized into sections reflecting the major areas of research focus at the INL. These sections begin with the DOE-NE Nuclear Science and Technology mission support area, followed by the National and Homeland Security and the Energy and Environmental Science and Technology areas. The major INL initiatives and the INL's Distinctive Signatures areas complete the project summaries. The appendices provide information on project relevance to DOE missions and major national programs as well as an author index, list of refereed publications and index of key terms.« less

  5. Office of Exploration: Exploration studies technical report. Volume 2: Studies approach and results

    NASA Technical Reports Server (NTRS)

    Roberts, Barney B.; Bland, Dan

    1988-01-01

    The NASA Office of Exploration has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report describes the process that has been developed in a case study approach. The four case studies that were developed in FY88 include: (1) human expedition to Phobos; (2) human expeditions to Mars; (3) lunar observatory; and (4) lunar outpost to early Mars evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work. Volume 2 describes the case study process, the technical results of each of the case studies, and opportunities for additional study. Included in the discussion of each case study is a description of the mission key features and profile. Mission definition and manifesting are detailed, followed by a description of the mission architecture and infrastructure. Systems concepts for the required orbital nodes, transportation systems, and planetary surface systems are discussed. Prerequisite implementation plans resulting from the synthesized case studies are described and in-depth assessments are presented.

  6. ITS/CVO technical project management for non-technical managers : participant guide

    DOT National Transportation Integrated Search

    1998-09-01

    In 1996, the FHWA Office of Motor Carriers (OMC) identified the need to develop a Technical Training Program to support the deployment of Intelligent Transportation System (ITS) technologies for Commercial Vehicle Operations (CVO). The workforce -...

  7. Technical Support for Contaminated Sites

    EPA Science Inventory

    In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled...

  8. Social transformation in transdisciplinary natural hazard management

    NASA Astrophysics Data System (ADS)

    Attems, Marie-Sophie; Fuchs, Sven; Thaler, Thomas

    2017-04-01

    Due to annual increases of natural hazard losses, there is a discussion among authorities and communities in Europe on innovative solutions to increase resilience, and consequently, business-as-usual in risk management practices is often questioned. Therefore, the current situation of risk management requests a societal transformation to response adequately and effectively to the new global dynamics. An emerging concept is the implementation of multiple-use mitigation systems against hazards such as floods, avalanches and land-slides. However, one key aspect refers to the involvement of knowledge outside academic research. Therefore, transdisciplinary knowledge can be used to discuss vital factors which are needed to upscale the implementation of multiple-use mitigation measures. The method used in this contribution is an explorative scenario analysis applied in Austria and processes the knowledge gained in transdisciplinary workshops. The scenario analysis combines qualitative data and the quantitative relations in order to generate a set of plausible future outcomes. The goal is to establish a small amount of consistent scenarios, which are efficient and thereby representative as well as significantly different from each other. The results of the discussions among relevant stakeholders within the workshops and a subsequent quantitative analysis, showed that vital variables influencing the multiple use of mitigation measures are the (1) current legislation, (2) risk acceptance among authorities and the public, (3) land-use pressure, (4) the demand for innovative solutions, (5) the available technical standards and possibilities and (6) finally the policy entrepreneurship. Four different scenarios were the final result of the analysis. Concluding the results, in order to make multiple-use alleviations systems possible contemporary settings concerning risk management strategies will have to change in the future. Legislation and thereby current barriers have to be altered in order to create a possibility for innovative solutions. If the state of the art in technical perspectives allows constructions with limited additional risk, multiple-use structures are an option in risk management. The present and future land-use pressure also intensifies the economic interest in finding and accepting such measures.

  9. Technical Communications in Aeronautics: Results of an Exploratory Study. An Analysis of Managers' and Nonmanagers' Responses. NASA Technical Memorandum 101625.

    ERIC Educational Resources Information Center

    Pinelli, Thomas E.; And Others

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that aerospace managers and nonmanagers have different technical communications practices. Five secondary assumptions were established for the analysis: (1) that the…

  10. Overview of the CERT Resilience Management Model (CERT-RMM)

    DTIC Science & Technology

    2014-01-23

    Management Model (CERT®-RMM) Jim Cebula Technical Manager - Cyber Risk Management , CERT® Division Jim Cebula is the Technical Manager of the...Cyber Risk Management team in the Cyber Security Solutions Directorate of the CERT Division at the Software Engineering Institute (SEI), a unit of...Carnegie Mellon University. Cebula’s current activities include risk management methods along with assessment and management of operational

  11. 76 FR 80226 - Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... final rule, effective upon publication. Generally, the Administrative Procedure Act (APA) requires a.... Additionally, the APA requires that a final rule must have a delayed effective date of 30 days from the date of... delayed effective date requirement under the APA. 5 U.S.C. 553(d)(3). Again the technical change conforms...

  12. "Type Ia Supernovae: Tools for Studying Dark Energy" Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woosley, Stan; Kasen, Dan

    2017-05-10

    Final technical report for project "Type Ia Supernovae: Tools for the Study of Dark Energy" awarded jointly to scientists at the University of California, Santa Cruz and Berkeley, for computer modeling, theory and data analysis relevant to the use of Type Ia supernovae as standard candles for cosmology.

  13. 76 FR 50202 - National Technical Assistance and Dissemination Center for Children Who Are Deaf-Blind; Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... DEPARTMENT OF EDUCATION [CFDA No. 84.326T] National Technical Assistance and Dissemination Center for Children Who Are Deaf-Blind; Final Extension of Project Period and Waiver AGENCY: Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of...

  14. TADS Final Evaluation Report, 1980-81. Appendix S.

    ERIC Educational Resources Information Center

    Suarez, Tanya M.; And Others

    The document contains the final report of the Technical Assistance Development System (TADS), a program which provided technical assistance (TA) services to 53 Handicapped Children's Early Education Program (HCEEP) demonstration projects and 13 State Implementation Grants (SIGs). The evaluation report is divided into five sections. Section 1…

  15. Security and emergency management technical assistance for the top 50 transit agencies

    DOT National Transportation Integrated Search

    2007-04-01

    Between May 2002 and July 2006, the Federal Transit Administration (FTA) provided technical assistance to the top 50 transit agencies through the Security and Emergency Management Technical Assistance Program (SEMTAP). The scope and purpose of the pr...

  16. The Management of Technical Services--1980.

    ERIC Educational Resources Information Center

    Rohdy, Margaret A.

    1981-01-01

    Examines the literature of administration of library technical services from both a library and a management approach, and describes some of the activities of management sections of various library organizations. There are 27 references. (RAA)

  17. Development of a framework for resilience measurement: Suggestion of fuzzy Resilience Grade (RG) and fuzzy Resilience Early Warning Grade (REWG).

    PubMed

    Omidvar, Mohsen; Mazloumi, Adel; Mohammad Fam, Iraj; Nirumand, Fereshteh

    2017-01-01

    Resilience engineering (RE) can be an alternative technique to the traditional risk assessment and management techniques, to predict and manage safety conditions of modern socio-technical organizations. While traditional risk management approaches are retrospective and highlight error calculation and computation of malfunction possibilities, resilience engineering seeks ways to improve capacity at all levels of organizations in order to build strong yet flexible processes. Considering the resilience potential measurement as a concern in complex working systems, the aim of this study was to quantify the resilience by the help of fuzzy sets and Multi-Criteria Decision-Making (MCDM) techniques. In this paper, we adopted the fuzzy analytic hierarchy process (FAHP) method to measure resilience in a gas refinery plant. A resilience assessment framework containing six indicators, each with its own sub-indicators, was constructed. Then, the fuzzy weights of the indicators and the sub-indicators were derived from pair-wise comparisons conducted by experts. The fuzzy evaluating vectors of the indicators and the sub-indicators computed according to the initial assessment data. Finally, the Comprehensive Resilience Index (CoRI), Resilience Grade (RG), and Resilience Early Warning Grade (REWG) were established. To demonstrate the applicability of the proposed method, an illustrative example in a gas refinery complex (an instance of socio-technical systems) was provided. CoRI of the refinery ranked as "III". In addition, for the six main indicators, RG and REWG ranked as "III" and "NEWZ", respectively, except for C3, in which RG ranked as "II", and REWG ranked as "OEWZ". The results revealed the engineering practicability and usefulness of the proposed method in resilience evaluation of socio-technical systems.

  18. The evolution of endovascular electroencephalography: historical perspective and future applications.

    PubMed

    Sefcik, Roberta K; Opie, Nicholas L; John, Sam E; Kellner, Christopher P; Mocco, J; Oxley, Thomas J

    2016-05-01

    Current standard practice requires an invasive approach to the recording of electroencephalography (EEG) for epilepsy surgery, deep brain stimulation (DBS), and brain-machine interfaces (BMIs). The development of endovascular techniques offers a minimally invasive route to recording EEG from deep brain structures. This historical perspective aims to describe the technical progress in endovascular EEG by reviewing the first endovascular recordings made using a wire electrode, which was followed by the development of nanowire and catheter recordings and, finally, the most recent progress in stent-electrode recordings. The technical progress in device technology over time and the development of the ability to record chronic intravenous EEG from electrode arrays is described. Future applications for the use of endovascular EEG in the preoperative and operative management of epilepsy surgery are then discussed, followed by the possibility of the technique's future application in minimally invasive operative approaches to DBS and BMI.

  19. Reassembling the Information Technology Innovation Process: An Actor Network Theory Method for Managing the Initiation, Production, and Diffusion of Innovations

    NASA Astrophysics Data System (ADS)

    Zendejas, Gerardo; Chiasson, Mike

    This paper will propose and explore a method to enhance focal actors' abilities to enroll and control the many social and technical components interacting during the initiation, production, and diffusion of innovations. The reassembling and stabilizing of such components is the challenging goal of the focal actors involved in these processes. To address this possibility, a healthcare project involving the initiation, production, and diffusion of an IT-based innovation will be influenced by the researcher, using concepts from actor network theory (ANT), within an action research methodology (ARM). The experiences using this method, and the nature of enrolment and translation during its use, will highlight if and how ANT can provide a problem-solving method to help assemble the social and technical actants involved in the diffusion of an innovation. Finally, the paper will discuss the challenges and benefits of implementing such methods to attain widespread diffusion.

  20. 48 CFR 2052.215-75 - Proposal presentation and format.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., i.e., competitive vs. noncompetitive, and the cost evaluation. (c) “Written Technical and Management... * copies. (1) The written Technical and Management Proposal or Oral Presentation and Supporting... objectives of this procurement. (3) The written Technical Proposal or Oral Presentation and Supporting...

  1. Development of an instrument for the evaluation of advanced life support performance.

    PubMed

    Peltonen, L-M; Peltonen, V; Salanterä, S; Tommila, M

    2017-10-01

    Assessing advanced life support (ALS) competence requires validated instruments. Existing instruments include aspects of technical skills (TS), non-technical skills (NTS) or both, but one instrument for detailed assessment that suits all resuscitation situations is lacking. This study aimed to develop an instrument for the evaluation of the overall ALS performance of the whole team. This instrument development study had four phases. First, we reviewed literature and resuscitation guidelines to explore items to include in the instrument. Thereafter, we interviewed resuscitation team professionals (n = 66), using the critical incident technique, to determine possible additional aspects associated with the performance of ALS. Second, we developed an instrument based on the findings. Third, we used an expert panel (n = 20) to assess the validity of the developed instrument. Finally, we revised the instrument based on the experts' comments and tested it with six experts who evaluated 22 video recorded resuscitations. The final version of the developed instrument had 69 items divided into adherence to guidelines (28 items), clinical decision-making (5 items), workload management (12 items), team behaviour (8 items), information management (6 items), patient integrity and consideration of laymen (4 items) and work routines (6 items). The Cronbach's α values were good, and strong correlations between the overall performance and the instrument were observed. The instrument may be useful for detailed assessment of the team's overall performance, but the numerous items make the use demanding. The instrument is still under development, and more research is needed to determine its psychometric properties. © 2017 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  2. Integrity management of offshore structures and its implication on computation of structural action effects and resistance

    NASA Astrophysics Data System (ADS)

    Moan, T.

    2017-12-01

    An overview of integrity management of offshore structures, with emphasis on the oil and gas energy sector, is given. Based on relevant accident experiences and means to control the associated risks, accidents are categorized from a technical-physical as well as human and organizational point of view. Structural risk relates to extreme actions as well as structural degradation. Risk mitigation measures, including adequate design criteria, inspection, repair and maintenance as well as quality assurance and control of engineering processes, are briefly outlined. The current status of risk and reliability methodology to aid decisions in the integrity management is briefly reviewed. Finally, the need to balance the uncertainties in data, methods and computational efforts and the cautious use and quality assurance and control in applying high fidelity methods to avoid human errors, is emphasized, and with a plea to develop both high fidelity as well as efficient, simplified methods for design.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deeb, Rula A.; Hawley, Elisabeth L.

    The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-termmore » management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed to evaluate alternative endpoints for groundwater remediation at complex sites. A statistical analysis of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) sites receiving TI waivers will be presented as well as case studies of other types of alternative endpoints and alternative remedial strategies that illustrate the variety of approaches used at complex sites and the technical analyses used to predict and document cost, time frame, and potential remedial effectiveness. This presentation is intended to inform DOE program managers, state regulators, practitioners and other stakeholders who are evaluating technical cleanup challenges within their own programs, and establishing programmatic approaches to evaluating and implementing long-term management approaches. Case studies provide examples of long-term management designations and strategies to manage and remediate groundwater at complex sites. At least 13 states consider some designation for groundwater containment in their corrective action policies, such as groundwater management zones, containment zones, and groundwater classification exemption areas. Long-term management designations are not a way to 'do nothing' or walk away from a site. Instead, soil and groundwater within the zone is managed to be protective of human health and the environment. Understanding when and how to adopt a long-term management approach can lead to cost savings and the more efficient use of resources across DOE and at numerous other industrial and military sites across the U.S. This presentation provides context for assessing the use and appropriate role of alternative endpoints and supporting long-term management designations in final remedies. (authors)« less

  4. The Office of Environmental Management technical reports: a bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995 through Sept. 30, 1996. This information is divided into the following categories: Focus Areas and Crosscutting Programs. Support Programs, Technology Integration and International Technology Exchange are now included in the General category. EM`s Office of Science and Technology sponsors this bibliography.

  5. 78 FR 57264 - Final Waiver and Extension of the Project Period for the Technical Assistance Coordination Center

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ...: 84.326Z.] Final Waiver and Extension of the Project Period for the Technical Assistance Coordination... project period. SUMMARY: The Secretary waives the requirements in the Education Department General Administrative Regulations that generally prohibit project periods exceeding five years and extensions of project...

  6. 77 FR 16923 - Agreements and Memoranda of Understanding Between the Food and Drug Administration and Other...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ...: Direct final rule. SUMMARY: This direct final rule makes technical changes that will update a requirement that many of our written agreements and memoranda of understanding (MOUs) with other departments..., accordingly, eliminates it. We are making these technical changes to conserve Agency time and resources...

  7. 1988 Underground Storage Tanks; Technical Requirements; Final Rule and Underground Storage Tanks Containing Petroleum-Financial Responsibility Requirements and State Program Approval Objective; Final Rule

    EPA Pesticide Factsheets

    EPA's 1988 regulations concerning USTs are contained in 40 CFR Part 280, 40 CFR Part 281 and 40 CFR Parts 282.50-282.105 and divided into three sections: technical requirements, financial responsibility requirements, and state program approval objectives.

  8. PITTSBURGH TECHNICAL HEALTH TRAINING INSTITUTE DEMONSTRATION PROJECT. FINAL REPORT, VOLUME II.

    ERIC Educational Resources Information Center

    KISHKUNAS, LOUIS J.

    APPENDIXES TO THE "FINAL REPORT," VOLUME I (VT 005 511), ARE INCLUDED--(1) A SCHEMATIC REPRESENTATION OF CURRICULUM DEVELOPMENT, (2) TECHNICAL BEHAVIOR CHECKLISTS, (3) PERFORMANCE INVENTORY FORMS USED IN ON-THE-JOB OBSERVATIONS, (4) REPORT FORM FOR TYPICAL JOB BEHAVIOR OF EMPLOYEE, (5) COOPERATING AREA HEALTH INSTITUTIONS, (6) TABLES OF Z SCORES…

  9. Situational Awareness Issues in the Implementation of Datalink: Shared Situational Awareness in the Joint Flight Deck-ATC Aviation System

    NASA Technical Reports Server (NTRS)

    Hansman, Robert John, Jr.

    1999-01-01

    MIT has investigated Situational Awareness issues relating to the implementation of Datalink in the Air Traffic Control environment for a number of years under this grant activity. This work has investigated: 1) The Effect of "Party Line" Information. 2) The Effect of Datalink-Enabled Automated Flight Management Systems (FMS) on Flight Crew Situational Awareness. 3) The Effect of Cockpit Display of Traffic Information (CDTI) on Situational Awareness During Close Parallel Approaches. 4) Analysis of Flight Path Management Functions in Current and Future ATM Environments. 5) Human Performance Models in Advanced ATC Automation: Flight Crew and Air Traffic Controllers. 6) CDTI of Datalink-Based Intent Information in Advanced ATC Environments. 7) Shared Situational Awareness between the Flight Deck and ATC in Datalink-Enabled Environments. 8) Analysis of Pilot and Controller Shared SA Requirements & Issues. 9) Development of Robust Scenario Generation and Distributed Simulation Techniques for Flight Deck ATC Simulation. 10) Methods of Testing Situation Awareness Using Testable Response Techniques. The work is detailed in specific technical reports that are listed in the following bibliography, and are attached as an appendix to the master final technical report.

  10. Invention and Writing in Technical Work: Representing the Object.

    ERIC Educational Resources Information Center

    Winsor, Dorothy A.

    1994-01-01

    Describes the way invention is relevant to the practice of technical writing. Studies three engineering students engaged in a real-world project. Shows how the students' technical work and invention for the final report were simultaneous activities. Claims that invention for and through writing overlaps with technical invention. (HB)

  11. Project T.E.A.M. (Technical Education Advancement Modules). Final Report.

    ERIC Educational Resources Information Center

    Greenville Technical Coll., SC.

    Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training, created an introductory technical training program and a consumer education package emphasizing the benefits of technical training. The curriculum and training focus of the project began with an assessment of employee needs in…

  12. An audit questionnaire that examines specifically the management of technical activities clauses in ISO 15189.

    PubMed

    Hartley, T F

    2010-01-01

    The aim of this study was to design an audit questionnaire that focuses on the management of the technical activities in a Diagnostic Pathology Laboratory. The ISO 15189 Standard is written in such a way that it continually moves back and forth from topics where the auditor needs to question bench level staff, to topics where the auditor needs to question Technical Management Staff. This makes for a disjointed audit process - both Bench Staff and Technical Managers are repeatedly interrupted. The solution was to do a clause by clause analysis of the Standard and assign the major responsibility for the compliance to each clause to either Technical Managers or Bench Staff. The Clauses were then grouped under four topic headings regardless of whether they were a Section 4 or Section 5 Clause. Two questionnaires have emerged - the one described in this work and one directed primarily towards the activities of bench staff. There are 95 questions and it takes approximately two hours to complete.

  13. 43 CFR 9269.3-3 - Minerals management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Minerals management. 9269.3-3 Section 9269... MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) LAW ENFORCEMENT-CRIMINAL Technical Services § 9269.3-3 Minerals management. (a) Oil and gas leasing. [Reserved] (b) Geothermal resources leasing...

  14. 43 CFR 9269.3-3 - Minerals management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Minerals management. 9269.3-3 Section 9269... MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) LAW ENFORCEMENT-CRIMINAL Technical Services § 9269.3-3 Minerals management. (a) Oil and gas leasing. [Reserved] (b) Geothermal resources leasing...

  15. 43 CFR 9269.3-3 - Minerals management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Minerals management. 9269.3-3 Section 9269... MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) LAW ENFORCEMENT-CRIMINAL Technical Services § 9269.3-3 Minerals management. (a) Oil and gas leasing. [Reserved] (b) Geothermal resources leasing...

  16. 43 CFR 9269.3-3 - Minerals management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Minerals management. 9269.3-3 Section 9269... MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) LAW ENFORCEMENT-CRIMINAL Technical Services § 9269.3-3 Minerals management. (a) Oil and gas leasing. [Reserved] (b) Geothermal resources leasing...

  17. Informal trail monitoring protocols: Denali National Park and Preserve. Final Report, October 2011

    USGS Publications Warehouse

    Marion, Jeffrey L.; Wimpey, Jeremy F.

    2011-01-01

    Managers at Alaska?s Denali National Park and Preserve (DENA) sponsored this research to assess and monitor visitor-created informal trails (ITs). DENA is located in south-central Alaska and managed as a six million acre wilderness park. This program of research was guided by the following objectives: (1) Investigate alternative methods for monitoring the spatial distribution, aggregate lineal extent, and tread conditions of informal (visitor-created) trails within the park. (2) In consultation with park staff, develop, pilot test, and refine cost-effective and scientifically defensible trail monitoring procedures that are fully integrated with the park?s Geographic Information System. (3) Prepare a technical report that compiles and presents research results and their management implications. This report presents the protocol development and field testing process, illustrates the types of data produced by their application, and provides guidance for their application and use. The protocols described provide managers with an efficient means to document and monitor IT conditions in settings ranging from pristine to intensively visited.

  18. Technical management techniques for identification and control of industrial safety and pollution hazards

    NASA Technical Reports Server (NTRS)

    Campbell, R.; Dyer, M. K.; Hoard, E. G.; Little, D. G.; Taylor, A. C.

    1972-01-01

    Constructive recommendations are suggested for pollution problems from offshore energy resources industries on outer continental shelf. Technical management techniques for pollution identification and control offer possible applications to space engineering and management.

  19. 77 FR 39623 - Airworthiness Standards: Aircraft Engines; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ...] Airworthiness Standards: Aircraft Engines; Technical Amendment AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule; technical amendment. SUMMARY: This amendment clarifies aircraft engine... from applicants requesting FAA engine type certifications and aftermarket certifications, such as...

  20. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  1. TMT approach to observatory software development process

    NASA Astrophysics Data System (ADS)

    Buur, Hanne; Subramaniam, Annapurni; Gillies, Kim; Dumas, Christophe; Bhatia, Ravinder

    2016-07-01

    The purpose of the Observatory Software System (OSW) is to integrate all software and hardware components of the Thirty Meter Telescope (TMT) to enable observations and data capture; thus it is a complex software system that is defined by four principal software subsystems: Common Software (CSW), Executive Software (ESW), Data Management System (DMS) and Science Operations Support System (SOSS), all of which have interdependencies with the observatory control systems and data acquisition systems. Therefore, the software development process and plan must consider dependencies to other subsystems, manage architecture, interfaces and design, manage software scope and complexity, and standardize and optimize use of resources and tools. Additionally, the TMT Observatory Software will largely be developed in India through TMT's workshare relationship with the India TMT Coordination Centre (ITCC) and use of Indian software industry vendors, which adds complexity and challenges to the software development process, communication and coordination of activities and priorities as well as measuring performance and managing quality and risk. The software project management challenge for the TMT OSW is thus a multi-faceted technical, managerial, communications and interpersonal relations challenge. The approach TMT is using to manage this multifaceted challenge is a combination of establishing an effective geographically distributed software team (Integrated Product Team) with strong project management and technical leadership provided by the TMT Project Office (PO) and the ITCC partner to manage plans, process, performance, risk and quality, and to facilitate effective communications; establishing an effective cross-functional software management team composed of stakeholders, OSW leadership and ITCC leadership to manage dependencies and software release plans, technical complexities and change to approved interfaces, architecture, design and tool set, and to facilitate effective communications; adopting an agile-based software development process across the observatory to enable frequent software releases to help mitigate subsystem interdependencies; defining concise scope and work packages for each of the OSW subsystems to facilitate effective outsourcing of software deliverables to the ITCC partner, and to enable performance monitoring and risk management. At this stage, the architecture and high-level design of the software system has been established and reviewed. During construction each subsystem will have a final design phase with reviews, followed by implementation and testing. The results of the TMT approach to the Observatory Software development process will only be preliminary at the time of the submittal of this paper, but it is anticipated that the early results will be a favorable indication of progress.

  2. GREMEX- GODDARD RESEARCH AND ENGINEERING MANAGEMENT EXERCISE SIMULATION SYSTEM

    NASA Technical Reports Server (NTRS)

    Vaccaro, M. J.

    1994-01-01

    GREMEX is a man-machine management simulation game of a research and development project. It can be used to depict a project from just after the development of the project plan through the final construction phase. The GREMEX computer programs are basically a program evaluation and review technique (PERT) reporting system. In the usual PERT program, the operator inputs each month the amount of work performed on each activity and the computer does the bookkeeping to determine the expected completion date of the project. GREMEX automatically assumes that all activities due to be worked in the current month will be worked. GREMEX predicts new durations (and costs) each month based on management actions taken by the players and the contractor's abilities. Each activity is assigned the usual cost and duration estimates but must also be assigned three parameters that relate to the probability that the time estimate is correct, the probability that the cost estimate is correct, and the probability of technical success. Management actions usually can be expected to change these probabilities. For example, use of overtime or double shifts in research and development work will decrease duration and increase cost by known proportions and will also decrease the probability of technical success due to an increase in the likelihood of accidents or mistakes. These re-estimating future events and assigning probability factors provides life to the model. GREMEX is not a production job for project management. GREMEX is a game that can be used to train management personnel in the administration of research and development type projects. GREMEX poses no 'best way' to manage a project. The emphasis of GREMEX is to expose participants to many of the factors involved in decision making when managing a project in a government research and development environment. A management team can win the game by surpassing cost, schedule, and technical performance goals established when the simulation began. The serious management experimenter can use GREMEX to explore the results of management methods they could not risk in real life. GREMEX can operate with any research and development type project with up to 15 subcontractors and produces reports simulating monthly or quarterly updates of the project PERT network. Included with the program is a data deck for simulation of a fictitious spacecraft project. Instructions for substituting other projects are also included. GREMEX is written in FORTRAN IV for execution in the batch mode and has been implemented on an IBM 360 with a central memory requirement of approximately 350K (decimal) of 8 bit bytes. The GREMEX system was developed in 1973.

  3. 77 FR 32013 - Truck Size and Weight; Technical Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ...-2012-0037] RIN 2125-AF45 Truck Size and Weight; Technical Correction AGENCY: Federal Highway...: This rule makes a technical correction to the regulations that govern Longer Combination Vehicles (LCV... INFORMATION CONTACT: John Nicholas, Truck Size and Weight Program Manager, Office of Freight Management and...

  4. [Access control management in electronic health records: a systematic literature review].

    PubMed

    Carrión Señor, Inmaculada; Fernández Alemán, José Luis; Toval, Ambrosio

    2012-01-01

    This study presents the results of a systematic literature review of aspects related to access control in electronic health records systems, wireless security and privacy and security training for users. Information sources consisted of original articles found in Medline, ACM Digital Library, Wiley InterScience, IEEE Digital Library, Science@Direct, MetaPress, ERIC, CINAHL and Trip Database, published between January 2006 and January 2011. A total of 1,208 articles were extracted using a predefined search string and were reviewed by the authors. The final selection consisted of 24 articles. Of the selected articles, 21 dealt with access policies in electronic health records systems. Eleven articles discussed whether access to electronic health records should be granted by patients or by health organizations. Wireless environments were only considered in three articles. Finally, only four articles explicitly mentioned that technical training of staff and/or patients is required. Role-based access control is the preferred mechanism to deploy access policy by the designers of electronic health records. In most systems, access control is managed by users and health professionals, which promotes patients' right to control personal information. Finally, the security of wireless environments is not usually considered. However, one line of research is eHealth in mobile environments, called mHealth. Copyright © 2011 SESPAS. Published by Elsevier Espana. All rights reserved.

  5. Prognostics and Health Management in Nuclear Power Plants: A Review of Technologies and Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coble, Jamie B.; Ramuhalli, Pradeep; Bond, Leonard J.

    This report reviews the current state of the art of prognostics and health management (PHM) for nuclear power systems and related technology currently applied in field or under development in other technological application areas, as well as key research needs and technical gaps for increased use of PHM in nuclear power systems. The historical approach to monitoring and maintenance in nuclear power plants (NPPs), including the Maintenance Rule for active components and Aging Management Plans for passive components, are reviewed. An outline is given for the technical and economic challenges that make PHM attractive for both legacy plants through Lightmore » Water Reactor Sustainability (LWRS) and new plant designs. There is a general introduction to PHM systems for monitoring, fault detection and diagnostics, and prognostics in other, non-nuclear fields. The state of the art for health monitoring in nuclear power systems is reviewed. A discussion of related technologies that support the application of PHM systems in NPPs, including digital instrumentation and control systems, wired and wireless sensor technology, and PHM software architectures is provided. Appropriate codes and standards for PHM are discussed, along with a description of the ongoing work in developing additional necessary standards. Finally, an outline of key research needs and opportunities that must be addressed in order to support the application of PHM in legacy and new NPPs is presented.« less

  6. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  7. Wolffian duct derivative anomalies: technical considerations when encountered during robot-assisted radical prostatectomy.

    PubMed

    Acharya, Sujeet S; Gundeti, Mohan S; Zagaja, Gregory P; Shalhav, Arieh L; Zorn, Kevin C

    2009-04-01

    Although malformations of the genitourinary tract are typically identified during childhood, they can remain silent until incidental detection in evaluation and treatment of other pathologies during adulthood. The advent of the minimally invasive era in urologic surgery has given rise to unique challenges in the surgical management of anomalies of the genitourinary tract. This article reviews the embryology of anomalies of Wolffian duct (WD) derivatives with specific attention to the seminal vesicles, vas deferens, ureter, and kidneys. This is followed by a discussion of the history of the laparoscopic approach to WD derivative anomalies. Finally, we present two cases to describe technical considerations when managing these anomalies when encountered during robotic-assisted radical prostatectomy. The University of Chicago Robotic Laparoscopic Radical Prostatectomy (RLRP) database was reviewed for cases where anomalies of WD derivatives were encountered. We describe how modifications in technique allowed for completion of the procedure without difficulty. None Of the 1230 RLRP procedures performed at our institution by three surgeons, only two cases (0.16%) have been noted to have a WD anomaly. These cases were able to be completed without difficulty by making simple modifications in technique. Although uncommon, it is important for the urologist to be familiar with the origin and surgical management of WD anomalies, particularly when detected incidentally during surgery. Simple modifications in technique allow for completion of RLRP without difficulty.

  8. 77 FR 22285 - Fisheries of the South Atlantic; South Atlantic Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... the South Atlantic; South Atlantic Fishery Management Council; Public Meeting AGENCY: National Marine... of a public meeting of the South Atlantic Fishery Management Council's Technical Shrimp Review Panel. SUMMARY: The South Atlantic Fishery Management Council (SAFMC) will hold a meeting of its Technical Shrimp...

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frenkel, G.; Paterson, T.S.; Smith, M.E.

    The Institute for Defense Analyses (IDA) has collected and analyzed information on battle management algorithm technology that is relevant to Battle Management/Command, Control and Communications (BM/C3). This Memorandum Report represents a program plan that will provide the BM/C3 Directorate of the Strategic Defense Initiative Organization (SDIO) with administrative and technical insight into algorithm technology. This program plan focuses on current activity in algorithm development and provides information and analysis to the SDIO to be used in formulating budget requirements for FY 1988 and beyond. Based upon analysis of algorithm requirements and ongoing programs, recommendations have been made for research areasmore » that should be pursued, including both the continuation of current work and the initiation of new tasks. This final report includes all relevant material from interim reports as well as new results.« less

  10. Analysis on energy consumption index system of thermal power plant

    NASA Astrophysics Data System (ADS)

    Qian, J. B.; Zhang, N.; Li, H. F.

    2017-05-01

    Currently, the increasingly tense situation in the context of resources, energy conservation is a realistic choice to ease the energy constraint contradictions, reduce energy consumption thermal power plants has become an inevitable development direction. And combined with computer network technology to build thermal power “small index” to monitor and optimize the management system, the power plant is the application of information technology and to meet the power requirements of the product market competition. This paper, first described the research status of thermal power saving theory, then attempted to establish the small index system and build “small index” monitoring and optimization management system in thermal power plant. Finally elaborated key issues in the field of small thermal power plant technical and economic indicators to be further studied and resolved.

  11. TWRS Configuration management program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  12. An analysis of the technical status of high level radioactive waste and spent fuel management systems

    NASA Technical Reports Server (NTRS)

    English, T.; Miller, C.; Bullard, E.; Campbell, R.; Chockie, A.; Divita, E.; Douthitt, C.; Edelson, E.; Lees, L.

    1977-01-01

    The technical status of the old U.S. mailine program for high level radioactive nuclear waste management, and the newly-developing program for disposal of unreprocessed spent fuel was assessed. The method of long term containment for both of these waste forms is considered to be deep geologic isolation in bedded salt. Each major component of both waste management systems is analyzed in terms of its scientific feasibility, technical achievability and engineering achievability. The resulting matrix leads to a systematic identification of major unresolved technical or scientific questions and/or gaps in these programs.

  13. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  14. 44 CFR 65.3 - Requirement to submit new technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technical data. 65.3 Section 65.3 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's base flood elevations may increase or decrease resulting from physical changes affecting flooding...

  15. Technical Training for Managers.

    ERIC Educational Resources Information Center

    Haverland, Edgar M.

    The question has arisen as to what kind of information a manager without extensive technical training needs to learn to supervise effectively. For example, the Nike Hercules fire control platoon leader, usually an officer in his first active duty assignment, seldom has had extensive technical training. Yet he is responsibile for the…

  16. 7 CFR 652.36 - Appeal of decertification decisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical service provider's written appeal, the Chief or his designee, will make a final determination, in... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE... of the State Conservationist's decertification determination, the technical service provider may...

  17. Technical Performance as a Predictor of Clinical Outcomes in Laparoscopic Gastric Cancer Surgery.

    PubMed

    Fecso, Andras B; Bhatti, Junaid A; Stotland, Peter K; Quereshy, Fayez A; Grantcharov, Teodor P

    2018-03-23

    The purpose of this study was to evaluate the relationship between technical performance and patient outcomes in laparoscopic gastric cancer surgery. Laparoscopic gastrectomy for cancer is an advanced procedure with high rate of postoperative morbidity and mortality. Many variables including patient, disease, and perioperative management factors have been shown to impact postoperative outcomes; however, the role of surgical performance is insufficiently investigated. A retrospective review was performed for all patients who had undergone laparoscopic gastrectomy for cancer at 3 teaching institutions between 2009 and 2015. Patients with available, unedited video-recording of their procedure were included in the study. Video files were rated for technical performance, using Objective Structured Assessments of Technical Skills (OSATS) and Generic Error Rating Tool instruments. The main outcome variable was major short-term complications. The effect of technical performance on patient outcomes was assessed using logistic regression analysis with backward selection strategy. Sixty-one patients with available video recordings were included in the study. The overall complication rate was 29.5%. The mean Charlson comorbidity index, type of procedure, and the global OSATS score were included in the final predictive model. Lower performance score (OSATS ≤29) remained an independent predictor for major short-term outcomes (odds ratio 6.49), while adjusting for comorbidities and type of procedure. Intraoperative technical performance predicts major short-term outcomes in laparoscopic gastrectomy for cancer. Ongoing assessment and enhancement of surgical skills using modern, evidence-based strategies might improve short-term patient outcomes. Future work should focus on developing and studying the effectiveness of such interventions in laparoscopic gastric cancer surgery.

  18. Capturing Cognitive Fingerprints for Active Authentication

    DTIC Science & Technology

    2014-10-01

    CAPTURING COGNITIVE FINGERPRINTS FOR ACTIVE AUTHENTICATION IOWA STATE UNIVERSITY OF SCIENCE & TECHNOLOGY OCTOBER 2014 FINAL TECHNICAL REPORT...REPORT TYPE FINAL TECHNICAL REPORT 3. DATES COVERED (From - To) SEP 2013 – APR 2014 4. TITLE AND SUBTITLE CAPTURING COGNITIVE FINGERPRINTS FOR ACTIVE...The project ended before the IRB application was approved. 15. SUBJECT TERMS Active Authentication, Cognitive Fingerprints , Biometric Modalities

  19. Application of Communications Satellites to Educational Development. Final Technical Report, September 1, 1969-August 31, 1975.

    ERIC Educational Resources Information Center

    Morgan, Robert P.

    Research is summarized in a brief final report built around a four-section bibliography. The first section lists periodic progress reports and articles which provide an overview of the program, including articles which pertain primarily to educational rather than technical aspects of satellite utilization. Theses carried out in the fields of…

  20. Exploring the Mismatch between Skills and Jobs for Women in Saudi Arabia in Technical and Vocational Areas: The Views of Saudi Arabian Private Sector Business Managers.

    ERIC Educational Resources Information Center

    Calvert, John R.; Al-Shetaiwi, A. S.

    2002-01-01

    Gives an overview of women in both general and technical-vocational education and employment in Saudi Arabia. Reports on a survey of 220 private business managers: 83% indicated that Saudi women had limited participation in technical jobs; 63% suggested that vocational-technical education did not promote women's participation. (Contains 51…

  1. Head Start Impact Study. Technical Report

    ERIC Educational Resources Information Center

    Puma, Michael; Bell, Stephen; Cook, Ronna; Heid, Camilla; Shapiro, Gary; Broene, Pam; Jenkins, Frank; Fletcher, Philip; Quinn, Liz; Friedman, Janet; Ciarico, Janet; Rohacek, Monica; Adams, Gina; Spier, Elizabeth

    2010-01-01

    This Technical Report is designed to provide technical detail to support the analysis and findings presented in the "Head Start Impact Study Final Report" (U.S. Department of Health and Human Services, January 2010). Chapter 1 provides an overview of the Head Start Impact Study and its findings. Chapter 2 provides technical information on the…

  2. Matching Community and Technical College Professional/Technical Education Capacity to Employer Demand. Final Report.

    ERIC Educational Resources Information Center

    Sommers, Paul; Heg, Deena

    A project was conducted to improve the state of Washington's community and technical college system by developing and using an improved occupational forecasting system to assess and respond to education and training needs. First, long-term occupational forecast data from Washington's Employment Security Department were matched with technical and…

  3. 75 FR 5784 - Guidance on Preparation of Market-Based Rate Filings and Electric Quarterly Reports by Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... Preparation of Market-Based Rate Filings and Electric Quarterly Reports by Public Utilities; Notice of Technical Conference January 28, 2010. Take notice that Commission staff will convene a technical conference... final agenda of the technical conference. The March 3, 2010 technical conference will focus on the...

  4. A Revision of Technical Mathematics Based on the NCTM Standards. Final Report.

    ERIC Educational Resources Information Center

    Near, Barbara

    Between 1993 and 1996, Henry Ford Community College (Michigan) worked with business, industry, and technical instructors to revise their Technical Mathematics program in accordance with the National Council of Teachers of Mathematics (NCTM) Standards. The purpose of the project was to restructure the technical math curriculum and create a context…

  5. 76 FR 11327 - Technical Amendments to Rule 17a-8: Financial Recordkeeping and Reporting of Currency and Foreign...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... SECURITIES AND EXCHANGE COMMISSION 17 CFR Part 240 [Release No. 34-63949] Technical Amendments to...: Securities and Exchange Commission. ACTION: Final rule; technical amendments. SUMMARY: The Securities and Exchange Commission (``Commission'') is adopting technical amendments to Rule 17a-8 under the Securities...

  6. Final priority; technical assistance to improve state data capacity--National Technical Assistance Center to improve state capacity to accurately collect and report IDEA data. Final priority.

    PubMed

    2013-05-20

    The Assistant Secretary for Special Education and Rehabilitative Services announces a priority under the Technical Assistance to Improve State Data Capacity program. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2013 and later years. We take this action to focus attention on an identified national need to provide technical assistance (TA) to States to improve their capacity to meet the data collection and reporting requirements of the Individuals with Disabilities Education Act (IDEA). We intend this priority to establish a TA center to improve State capacity to accurately collect and report IDEA data (Data Center).

  7. Approach to the E-ELT dome and main structure challenges

    NASA Astrophysics Data System (ADS)

    Bilbao, Armando; Murga, Gaizka; Gómez, Celia; Llarena, Javier

    2014-07-01

    The E-ELT as a whole could be classified as an extremely challenging project. More precisely, it should be defined as an array of many different sub-challenges, which comprise technical, logistical and managerial matters. This paper reviews some of these critical challenges, in particular those related to the Dome and the Main Structure, suggesting ways to face them in the most pragmatic way possible. Technical challenges for the Dome and the Main Structure are mainly related to the need to upscale current design standards to an order of magnitude larger design. Trying a direct design escalation is not feasible; it would not work. A design effort is needed to cross hybridize current design standards with technologies coming from other different applications. Innovative design is therefore not a wish but a must. And innovative design comes along with design risk. Design risk needs to be tackled from two angles: on the one hand through thorough design validation analysis and on the other hand through extensive pre-assembly and testing. And, once again, full scale integrated pre-assembly and testing of extremely large subsystems is not always possible. Therefore, defining a comprehensive test plan for critical components, critical subsystems and critical subassemblies becomes essential. Logistical challenges are linked to the erection site. Cerro Armazones is a remote site and this needs to be considered when evaluating transport and erection requirements. But it is not only the remoteness of the site that needs to be considered. The size of both Dome and Main Structure require large construction cranes and a well defined erection plan taking into account pre-assembly strategies, limited plan area utilization, erection sequence, erection stability during intermediate stages and, very specifically, efficient coordination between the Dome and the Main Structure erection processes. Managerial issues pose another set of challenges in this project. Both the size of the project and its special technical characteristics require specific managerial skills. Due to the size of the project it becomes essential to effectively manage and integrate a large number of suppliers and fabricators, of very different nature and geographically distributed. Project management plans need to cope with this situation. Also, extensive on site activities require intensive on site organization in line with large construction management strategies. Finally, the technical edge of the project requires deep technical understanding at management level in order to be able to take sound strategic decisions throughout the project in terms of the overall project quality, cost and schedule.

  8. Technical Evaluation Motor No. 10 (TEM-10)

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Technical Evaluation Motor No. 10 (TEM-10) was static fired on 27 Apr. 1993 at the Thiokol Corporation full-scale motor static test bay, T-24. This final test report documents the procedures, performance, and results of the static test firing of TEM-10. All observations, discussions, conclusions, and recommendations contained are final. Included is a presentation and discussion of TEM-10 performance, anomalies, and test results in concurrence with the objectives outlined in CTP-0110, Revision D, Space Shuttle Technical Evaluation Motor No. 10 (TEM-10) Static Fire Test Plan.

  9. Technical Topic 3.2.2.d Bayesian and Non-Parametric Statistics: Integration of Neural Networks with Bayesian Networks for Data Fusion and Predictive Modeling

    DTIC Science & Technology

    2016-05-31

    and included explosives such as TATP, HMTD, RDX, RDX, ammonium nitrate , potassium perchlorate, potassium nitrate , sugar, and TNT. The approach...Distribution Unlimited UU UU UU UU 31-05-2016 15-Apr-2014 14-Jan-2015 Final Report: Technical Topic 3.2.2. d Bayesian and Non- parametric Statistics...of Papers published in non peer-reviewed journals: Final Report: Technical Topic 3.2.2. d Bayesian and Non-parametric Statistics: Integration of Neural

  10. Final Technical Report Overcoming Critical Barriers to U.S. Wind Power: A University-Industry Consortium

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acker, Tom; Kipple, Allison

    The objective of this project was to develop a curriculum module involving the design and simulation of a wind turbine generator. Dr. Allison Kipple, Assistant Professor of Electrical Engineering, led development of the module, employing graduate and undergraduate students, and Dr. Tom Acker served as project manager and principal investigator. This objective was achieved resulting in development of curricular materials, implementation and revision of the materials in EE 364, a Northern Arizona University electrical engineering course in “Fundamentals of Electromagnetics,” and via dissemination of the curricular materials to a broad community including other universities.

  11. Information technology challenges of biodiversity and ecosystems informatics

    USGS Publications Warehouse

    Schnase, J.L.; Cushing, J.; Frame, M.; Frondorf, A.; Landis, E.; Maier, D.; Silberschatz, A.

    2003-01-01

    Computer scientists, biologists, and natural resource managers recently met to examine the prospects for advancing computer science and information technology research by focusing on the complex and often-unique challenges found in the biodiversity and ecosystem domain. The workshop and its final report reveal that the biodiversity and ecosystem sciences are fundamentally information sciences and often address problems having distinctive attributes of scale and socio-technical complexity. The paper provides an overview of the emerging field of biodiversity and ecosystem informatics and demonstrates how the demands of biodiversity and ecosystem research can advance our understanding and use of information technologies.

  12. Report from the School of Experience: Lessons-Learned on NASA's EOS/ICESat Mission

    NASA Technical Reports Server (NTRS)

    Anselm, William

    2003-01-01

    Abstract-NASA s Earth Observing System EOS) Ice, Cloud, and Land Elevation Satellite (ICESat) mission was one of the first missions under Goddard Space Flight Center s (then-) new Rapid Spacecraft Development Office. This paper explores the lessons-learned under the ICESat successful implementation and launch, focusing on four areas: Procurement., Management, Technical, and Launch and Early Operations. Each of these areas is explored in a practical perspective of communication, the viewpoint of the players, and the interactions among the organizations. Conclusions and lessons-learned are summarized in the final section.

  13. Trip report on IAEA Training Workshop on Implementation of Integrated Management Systems for Research Reactors (T3-TR-45496).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pratt, Richard J.

    2013-11-01

    From 17-21 June 2013, Sandia National Laboratories, Technical Area-V (SNL TA-V) represented the United States Department of Energy/National Nuclear Security Administration (DOE/NNSA) at the International Atomic Energy Agency (IAEA) Training Workshop (T3-TR-45486). This report gives a breakdown of the IAEA regulatory structure for those unfamiliar, and the lessons learned and observations that apply to SNL TA-V that were obtained from the workshop. The Safety Report Series, IAEA workshop final report, and SNL TA-V presentation are included as attachments.

  14. Automatic Traffic Advisory and Resolution Service (ATARS) Algorithms Including Resolution-Advisory-Register Logic. Volume 1. Sections 1 through 11,

    DTIC Science & Technology

    1981-06-01

    Donald Roberts contributed to the final design review and editing of this document as well as having overall project and technical management...and Reporting function 7. A Data Extraction function 1-5 2. SYSTEM OVERVIEW The basic concept of ATARS is very briefly reviewed here as background to...8-P30 PRM threatadvisorydeerination; If! ((SVECT1.CUNC 12 %P&LSZ jfl SV2c?t.ITSEQ 11 UNflQ) (SVUCT2.CUNC 12 SPILS2 LU SYICT2.&TS2Q j1, UIZQ)) TRS 2W

  15. A success paradigm for project managers in the aerospace industry

    NASA Astrophysics Data System (ADS)

    Bauer, Barry Jon

    Within the aerospace industry, project managers traditionally have been selected based on their technical competency. While this may lead to brilliant technical solutions to customer requirements, a lack of management ability can result in failed programs that over-run on cost, are late to critical path schedules, fail to fully utilize the diversity of talent available within the program team, and otherwise disappoint key stakeholders. This research study identifies the key competencies that a project manager should possess in order to successfully lead and manage a project in the aerospace industry. The research attempts to show evidence that within the aerospace industry, it is perceived that management competency is more important to project management success than only technical competence.

  16. Configuration Management Plan for K Basins

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weir, W.R.; Laney, T.

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less

  17. Technical snow production in skiing areas: conditions, practice, monitoring and modelling. A case study in Mayrhofen/Austria

    NASA Astrophysics Data System (ADS)

    Strasser, Ulrich; Hanzer, Florian; Marke, Thomas; Rothleitner, Michael

    2017-04-01

    The production of technical snow today is a self-evident feature of modern alpine skiing resort management. Millions of Euros are invested every year for the technical infrastructure and its operation to produce a homogeneous and continuing snow cover on the skiing slopes for the winter season in almost every larger destination in the Alps. In Austria, skiing tourism is a significant factor of the national economic structure. We present the framing conditions of technical snow production in the mid-size skiing resort of Mayrhofen (Zillertal Alps/Austria, 136 km slopes, elevation range 630 - 2.500 m a.s.l.). Production conditions are defined by the availability of water, the planned date for the season opening, and the climatic conditions in the weeks before. By means of an adapted snow production strategy an attempt is made to ecologically and economically optimize the use of water and energy resources. Monitoring of the snow cover is supported by a network of low-cost sensors and mobile snow depth recordings. Finally, technical snow production is simulated with the spatially distributed, physically based hydroclimatological model AMUNDSEN. The model explicitly considers individual snow guns and distributes the produced snow along the slopes. The amount of simulated snow produced by each device is a function of its type, of actual wet-bulb temperature at the location, of ski area infrastructure (in terms of water supply and pumping capacity), and of snow demand.

  18. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  19. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  20. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  1. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  2. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  3. Spruce-fir management and spruce budworm; SAF region VI technical conference

    Treesearch

    Daniel Schmitt; ed.

    1985-01-01

    Presents a technical update of the management of spruce-fir forests. Integrated management of eastern spruce budworm is not yet a reality. The ecological, social, and economic knowledge needed to develop an integrated management system is not available. The conference was designed to move individuals to a higher level of spruce budworm management in the eastern spruce-...

  4. Northeast Waste Management Enterprise (NEWME) 1996 annual/final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goland, A.; Kaplan, E.; Palmedo, P. Wortman, J.

    1997-10-01

    The Northeast Waste Management Enterprise was created in response to Dr. Clyde Frank`s vision of a new partnership between research, industrial, and financial sectors, with the goal of speeding development and use (particularly at U.S. Department of Energy [DOE] facilities) of environmental remediation technologies. It was anticipated that this partnership would also strengthen the international competitiveness of the U.S. environmental industry. Brookhaven National Laboratory`s (BNL) response to Dr. Frank was a proposal to create the Northeast Waste Management Alliance, later renamed the Northeast Waste Management Enterprise (NEWME). Recognizing the need to supplement its own technical expertise with acumen in business,more » financial management, and venture capital development, BNL joined forces with the Long Island Research Institute (LIRI). Since its inception at the end of FY 1993, NEWME has achieved several significant accomplishments in pursuing its original business and strategic plans. However, its successes have been constrained by a fundamental mismatch between the time scales required for technology commercialization, and the immediate need for available environmental technologies of those involved with ongoing environmental remediations at DOE facilities.« less

  5. 76 FR 50276 - STP Nuclear Operating Company, South Texas Project, Units 1 and 2; Notice of Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... revised the application of Risk- Managed Technical Specifications to Technical Specification 3.7.7, ``Control Room Makeup and Cleanup Filtration System.'' The purpose of the change was to correct a misapplication of the Configuration Risk Management Program that is currently allowed by the Technical...

  6. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  7. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  8. Final June Revisions Rule Significant Contribution Assessment TSD

    EPA Pesticide Factsheets

    This Technical Support Document (TSD) presents quantitative assessments of the relationship between the final February revisions to the Transport Rule, the final June revisions rule, and the original analysis conducted for the final Transport Rule.

  9. Laser Technician Associate Degree Program. A Proposal Submitted to Wisconsin State Board of Vocational, Technical, and Adult Education. (Curriculum Development.) Final Report.

    ERIC Educational Resources Information Center

    North Central Technical Inst., Wausau, WI.

    This final report contains the program proposal with supporting data for developing curriculum materials for and implementing an associate-degree laser technology program at the North Central Technical Institute. The proposal outline provides this information: (1) objectives for the program designed to prepare a technician to safely operate,…

  10. California Deaf-Blind Services Final Report, October 1, 1995-September 30, 1999 [and] October 1, 1999-June 30, 2000 (No Cost Extension).

    ERIC Educational Resources Information Center

    Goertz, Lori; Franklin, Barbara

    This final report describes the activities and outcomes of the California Deaf-Blind Services (CDBS) program, a regionally based, family focused technical assistance and training project designed to improve services to children with deaf-blindness. The project conducted the following activities: (1) provided technical assistance to families and…

  11. New Jersey Technical Assistance Project (N.J. TAP): "Educational Resources and Support Services on Behalf of Children with Multiple Sensory Impairment." Final Report.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Education, Trenton.

    This final report describes activities and accomplishments of the New Jersey Technical Assistance Project, a project to improve educational resources and support services for students with multiple sensory impairment (deaf-blindness). Activities and accomplishments are presented in a tabular format for each project goal and objective. The project…

  12. 78 FR 77563 - Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ... NATIONAL CREDIT UNION ADMINISTRATION 12 CFR Parts 700, 701, and 704 RIN 3133-AE33 Technical Amendments AGENCY: National Credit Union Administration (NCUA). ACTION: Final rule. SUMMARY: The NCUA Board... credit unions. The technical amendments conform the regulations to a recent policy change adopted by the...

  13. 75 FR 33682 - Export Administration Regulations; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ...-01] RIN 0694-AE93 Export Administration Regulations; Technical Amendments AGENCY: Bureau of Industry... Bureau of Industry and Security (BIS) makes a technical amendment to the Export Administration... review of final decisions and orders issued in BIS export control administrative enforcement proceedings...

  14. 78 FR 41331 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 225 Defense Federal Acquisition Regulation Supplement; Technical Amendments AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Final rule. SUMMARY: DoD is making technical amendment to the Defense...

  15. Final Revisions Rule Significant Contribution Assessment TSD

    EPA Pesticide Factsheets

    This Technical Support Document (TSD) presents quantitative assessments of the relationship between final revisions to the Transport Rule and the original analysis conducted for the final Transport Rule.

  16. Innovation adoption processes for third party property management companies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shockman, Chris; Piette, Mary Ann

    2000-07-01

    Innovation adoption studies have never been applied to third party property management companies. These companies manage buildings for a fee as their primary business. Property management companies are influential in the adoption process for new technologies because they act as gatekeepers for technical information. This study analyzes radical and routine adoption process that are found in large, professionally operated property management companies. The process is explicated. The technical managers, and their role as technology gate keepers, are described. The distinction to the technical managers between routine and radical technology is that routine technologies do something in a new way andmore » radical technologies do something new. Observations concerning evaluation and adoption of information technologies are described. The findings suggest methods of successfully tailoring and introducing technologies to this market.« less

  17. A Toxicology for the 21st Century—Mapping the Road Ahead

    PubMed Central

    Hartung, Thomas

    2009-01-01

    The landmark publication by the National Research Council putting forward a vision of a toxicology for the 21st century in 2007 has created an atmosphere of departure in our field. The alliances formed, symposia and meetings held and the articles following are remarkable, indicating that this is an idea whose time has come. Most of the discussion centers on the technical opportunities to map pathways of toxicity and the financing of the program. Here, the other part of the work ahead shall be discussed, that is, the focus is on regulatory implementation once the technological challenges are managed, but we are well aware that the technical aspects of what the National Academy of Science report suggests still need to be addressed: A series of challenges are put forward which we will face in addition to finding a technical solution (and its funding) to set this vision into practice. This includes the standardization and quality assurance of novel methodologies, their formal validation, their integration into test strategies including threshold setting and finally a global acceptance and implementation. This will require intense conceptual steering to have all pieces of the puzzle come together. PMID:19357069

  18. Technical Support for Contaminated Sites | Science Inventory ...

    EPA Pesticide Factsheets

    In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled ORD to provide effective technical assistance by ensuring ORD scientists and engineers were accessible to the Agency’s Office and Regional decision makers, including Remedial Project Managers, On-Scene Coordinators, and corrective action staff. Five ORD Technical Support Centers (TSCs) were created to facilitate this technical assistance. Three of the five TSCs are supported by the Sustainable and Healthy Communities Research Program, and are summarized in the poster being presented:• Engineering Technical Support Center (ETSC) in Cincinnati, Ohio• Ground Water Technical Support Center (GWTSC) in Ada, Oklahoma• Site Characterization and Monitoring Technical Support Center (SCMTSC) in Atlanta, GeorgiaOver the past 29 years, the Technical Support Centers have provided numerous influential products to its internal Agency clients and to those at the State level (through the EPA Regions). These products include, but are not limited to the following: Annual TSC reports from the three Centers, a hard-rock mining conference every other year, PRO-UCL software development for site characterization statistics, groundwater modeling using state-of-the-art modeling software, numerical mo

  19. Introducing future engineers to sustainable ecology problems: a case study

    NASA Astrophysics Data System (ADS)

    Filipkowski, A.

    2011-12-01

    The problem of Earth environmental destruction by human activities is becoming dangerous. Engineers responsible for the production of any goods should be well aware of the negative influence of their activities on the state of the planet. This is why the understanding of ecological problems is essential for people responsible for production and industrial design. The energy, which they consume, is increasing the greenhouse effect and the waste poisons the environment. So far, most courses on ecology are offered to specialists in environmental engineering. These courses are filled with many details. The Warsaw Academy of Computer Science, Management and Administration teaches students in the direction of management and production engineering. Upon completion, the students receive the degree of 'engineer'. Their future work will mainly concern management of different types of industrial enterprises and they will be responsible for organising it in such a way as to avoid a dangerous contribution to environmental pollution and climate change. This is why it was decided to introduce a new course entitled 'Principles of Ecology and Environmental Management'. This course is quite broad, concerning almost all technical, law and organisational aspects of the problem. The presentation is made in a spectacular way, aiming to convince students that their future activity must be environmentally friendly. It contains information about international activities in ecology, legal aspects concerning pollution, technical and information methods of monitoring and, finally, the description of 'green' solutions. Altogether, 27 hours of lectures and 15 hours of discussions and students' presentations complete the course. Details of this course are described in this paper.

  20. Integrated watershed planning across jurisdictional boundaries

    NASA Astrophysics Data System (ADS)

    Watts, A. W.; Roseen, R.; Stacey, P.; Bourdeau, R.

    2014-12-01

    We will present the foundation for an Coastal Watershed Integrated Plan for three communities in southern New Hampshire. Small communities are often challenged by complex regulatory requirements and limited resources, but are wary of perceived risks in engaging in collaborative projects with other communities. Potential concerns include loss of control, lack of resources to engage in collaboration, technical complexity, and unclear benefits. This project explores a multi-town subwatershed application of integrated planning across jurisdictional boundaries that addresses some of today's highest priority water quality issues: wastewater treatment plant upgrades for nutrient removal; green infrastructure stormwater management for developing and re-developing areas; and regional monitoring of ecosystem indicators in support of adaptive management to achieve nutrient reduction and other water quality goals in local and downstream waters. The project outcome is a collaboratively-developed inter-municipal integrated plan, and a monitoring framework to support cross jurisdictional planning and assess attainment of water quality management goals. This research project has several primary components: 1) assessment of initial conditions, including both the pollutant load inputs and the political, economic and regulatory status within each community, 2) a pollutant load model for point and non-point sources, 3) multi-criteria evaluation of load reduction alternatives 4) a watershed management plan optimized for each community, and for Subwatersheds combining multiple communities. The final plan will quantify the financial and other benefits/drawbacks to each community for both inter municipal and individual pollution control approaches. We will discuss both the technical and collaborative aspects of the work, with lessons learned regarding science to action, incorporation of social, economic and water quality assessment parameters, and stakeholder/researcher interaction.

  1. Assessment of the Technical Training Received by Source Selection Participants in Air Force Systems Command.

    DTIC Science & Technology

    1986-09-01

    60 48.4 Systems 200/400 15 12.1 Contract Administration (PPM 152) 13 10.5 Logistics Management (Log 224) 2 1.6 Government Contract Law (PPM 302) 20...detail. 1. Systems 200/400 2. Contract Administration (PPM 152) 3. Logistics Management (LOG 224) 4. Government Contract Law (PPM 302) 5. Technical...152 Contract Administration o Log 224 Logistics Management o PPM 302 Government Contract Law o QMT 345 Quantitative Technical, Cost, and Price Analysis

  2. 75 FR 15342 - Advisory Committees; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration 21 CFR Part 14 [Docket No. FDA-2010-N-0001] Advisory Committees; Technical Amendment Agency: Food and Drug Administration, HHS. ACTION: Final rule; technical amendment. SUMMARY: The Food and Drug Administration (FDA) is amending its...

  3. Government Information Quarterly. Volume 7, no. 2: National Aeronautics and Space Administration Scientific and Technical Information Programs. Special issue

    NASA Technical Reports Server (NTRS)

    Hernon, Peter (Editor); Mcclure, Charles R. (Editor); Pinelli, Thomas E. (Editor)

    1990-01-01

    NASA scientific and technical information (STI) programs are discussed. Topics include management of information in a research and development agency, the new space and Earth science information systems at NASA's archive, scientific and technical information management, and technology transfer of NASA aerospace technology to other industries.

  4. Management Studies Educational Knowledge: Technical, Elite or Political?

    ERIC Educational Resources Information Center

    Hordern, Jim

    2014-01-01

    This paper draws on the technical, elite and political interpretations of the purpose of management, to identify demands for particular forms of educational knowledge in the management studies curriculum. The varied character of this knowledge is discussed using Bernsteinian concepts of verticality, grammaticality, classification and framing, and…

  5. ERCMExpress. Volume 1, Issue 1

    ERIC Educational Resources Information Center

    US Department of Education, 2005

    2005-01-01

    This is the inaugural issue of the Emergency Response and Crisis Management (ERCM) Technical Assistance Center's "ERCMExpress," and it focuses on the new technical assistance center. The center will support 243 grantees funded under the Emergency Response and Crisis Management program in managing and implementing their projects, and in sustaining…

  6. 15 CFR 1150.3 - Approved markings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Federal Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical... Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical Technology...

  7. 15 CFR 1150.3 - Approved markings.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Federal Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical... Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical Technology...

  8. 15 CFR 1150.3 - Approved markings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Federal Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical... Standard 595a may be obtained from the Office of Engineering and Technical Management, Chemical Technology...

  9. 2012 Technical Corrections Fact Sheet

    EPA Pesticide Factsheets

    Final Rule: 2012 Technical Corrections, Clarifying and Other Amendments to theGreenhouse Gas Reporting Rule, and Confidentiality Determinations for Certain DataElements of the Fluorinated Gas Source Category

  10. A case-study of landfill minimization and material recovery via waste co-gasification in a new waste management scheme

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tanigaki, Nobuhiro, E-mail: tanigaki.nobuhiro@eng.nssmc.com; Ishida, Yoshihiro; Osada, Morihiro

    Highlights: • A new waste management scheme and the effects of co-gasification of MSW were assessed. • A co-gasification system was compared with other conventional systems. • The co-gasification system can produce slag and metal with high-quality. • The co-gasification system showed an economic advantage when bottom ash is landfilled. • The sensitive analyses indicate an economic advantage when the landfill cost is high. - Abstract: This study evaluates municipal solid waste co-gasification technology and a new solid waste management scheme, which can minimize final landfill amounts and maximize material recycled from waste. This new scheme is considered for amore » region where bottom ash and incombustibles are landfilled or not allowed to be recycled due to their toxic heavy metal concentration. Waste is processed with incombustible residues and an incineration bottom ash discharged from existent conventional incinerators, using a gasification and melting technology (the Direct Melting System). The inert materials, contained in municipal solid waste, incombustibles and bottom ash, are recycled as slag and metal in this process as well as energy recovery. Based on this new waste management scheme with a co-gasification system, a case study of municipal solid waste co-gasification was evaluated and compared with other technical solutions, such as conventional incineration, incineration with an ash melting facility under certain boundary conditions. From a technical point of view, co-gasification produced high quality slag with few harmful heavy metals, which was recycled completely without requiring any further post-treatment such as aging. As a consequence, the co-gasification system had an economical advantage over other systems because of its material recovery and minimization of the final landfill amount. Sensitivity analyses of landfill cost, power price and inert materials in waste were also conducted. The higher the landfill costs, the greater the advantage of the co-gasification system has. The co-gasification was beneficial for landfill cost in the range of 80 Euro per ton or more. Higher power prices led to lower operation cost in each case. The inert contents in processed waste had a significant influence on the operating cost. These results indicate that co-gasification of bottom ash and incombustibles with municipal solid waste contributes to minimizing the final landfill amount and has great possibilities maximizing material recovery and energy recovery from waste.« less

  11. A Study of Relationships among Technical, Tactical, Physical Parameters and Final Outcomes in Elite Soccer Matches as Analyzed by a Semiautomatic Video Tracking System.

    PubMed

    Filetti, Cristoforo; Ruscello, Bruno; D'Ottavio, Stefano; Fanelli, Vito

    2017-06-01

    The performance of a soccer team depends on many factors such as decision-making, cognitive and physical skills, and dynamic ever-changing space-time interactions between teammate and opponents in relation to the ball. Seventy ( n = 70) matches of the Italian SERIE A season 2013-2014 were investigated to analyze the mean performance of 360 players in terms of physical (physical efficiency index; PEI) and technical-tactical (technical efficiency index; TEI) standpoints. Using a semiautomatic video analysis system that has incorporated new parameters able to measure technical-tactical and physical efficiency (Patent IB2010/002593, 2011-ISA), the correlation between these new variables and how much it relates to the likelihood of winning were verified. Correlations between TEI and PEI were significant ( n = 140, r = .60, p < .001), and TEI showed a higher likelihood of winning than PEI factors ( p < .0001 vs. .0001, CI 95% [1.64, 3.00] vs. [1.28, 2.07]). Higher TEI and TEI + PEI differences between the teams were associated with a greater likelihood of winning, but PEI differences were not. Key performance indicators and this performance assessment method might be useful to better understand what determines winning and to assist the overall training process and match management.

  12. Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS): Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    de Boer, Gijs; Lawrence, Dale; Palo, Scott

    2017-03-29

    This final technical report details activities undertaken as part of the referenced project. Included is information on the preparation of aircraft for deployment to Alaska, summaries of the three deployments covered under this project, and a brief description of the dataset and science directions pursued. Additionally, we provide information on lessons learned, publications, and presentations resulting from this work.

  13. Joint Technical Architecture for Robotic Systems (JTARS)-Final Report

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Holloway, Sidney E., III

    2006-01-01

    This document represents the final report for the Joint Technical Architecture for Robotic Systems (JTARS) project, funded by the Office of Exploration as part of the Intramural Call for Proposals of 2005. The project was prematurely terminated, without review, as part of an agency-wide realignment towards the development of a Crew Exploration Vehicle (CEV) and meeting the near-term goals of lunar exploration.

  14. Review of Final Year MSP Evaluations, Performance Period 2007. Analytic and Technical Support for Mathematics and Science Partnerships

    ERIC Educational Resources Information Center

    Bobronnikov, Ellen; Rhodes, Hilary; Bradley, Cay

    2010-01-01

    This final report culminates the evaluation and technical assistance provided for the U.S. Department of Education's Mathematics and Science Partnership (MSP) Program and its projects since 2005. As part of this support, Abt Associates looked across the portfolio of projects funded by the MSP program to draw lessons on best practices. This…

  15. 41 CFR 105-50.001-5 - Specialized or technical services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., technical tests and evaluations, technical information, training activities, surveys, reports, documents... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Specialized or technical... TECHNICAL SERVICES TO STATE AND LOCAL UNITS OF GOVERNMENT § 105-50.001-5 Specialized or technical services...

  16. Nutritional Management of Acute Diarrhea in Infants and Children.

    ERIC Educational Resources Information Center

    National Academy of Sciences-National Research Council, Washington, DC. Food and Nutrition Board.

    Written primarily for health professionals advising on programs and policy related to nutrition and diarrhea therapy, this report is aimed at management of diarrhea in less-developed countries, but its information and technical insights are relevant to an understanding of diarrhea and its management throughout the world. Technical in orientation…

  17. Computerising the Salesforce: The Introduction of Technical Change in a Non-Union Workforce.

    ERIC Educational Resources Information Center

    Newell, Helen; Lloyd, Caroline

    1998-01-01

    Results of interviews with 13 pharmaceutical sales representatives, five sales managers, and six human-resource managers and 47 survey responses showed that introduction of information technology was seen as purely technical; human-resources departments played no role; and informal communication procedures enabled management to ignore individual…

  18. A Study of the Relationship between Personality Types and the Acceptance of Technical Knowledge Management Systems (TKMS)

    ERIC Educational Resources Information Center

    Sullivan, Maureen S.

    2012-01-01

    Technical knowledge management systems (TKMSs) are not achieving the usage (acceptance) and the benefits that have been forecasted and are therefore, not enhancing competitive advantage and profits in organizations (Comb, 2004, "Assessing customer relationship management strategies for creating competitive advantage in electronic…

  19. Technical Communications in OSS Content Management Systems: An Academic Institutional Case Study

    ERIC Educational Resources Information Center

    Cripps, Michael J.

    2011-01-01

    Single sourcing through a content management system (CMS) is altering technical communication practices in many organizations, including institutions of higher education. Open source software (OSS) solutions are currently among the most popular content management platforms adopted by colleges and universities in the United States and abroad. The…

  20. Pacific Educational Computer Network Study. Final Report.

    ERIC Educational Resources Information Center

    Hawaii Univ., Honolulu. ALOHA System.

    The Pacific Educational Computer Network Feasibility Study examined technical and non-technical aspects of the formation of an international Pacific Area computer network for higher education. The technical study covered the assessment of the feasibility of a packet-switched satellite and radio ground distribution network for data transmission…

  1. Barriers to Co-Designing Mobile Technology with Persons with Dementia and Their Carers.

    PubMed

    O'Connor, Siobhan; Bouamrane, Matt-Mouley; O'Donnell, Catherine A; Mair, Frances S

    2016-01-01

    Mobile applications can be used to help manage different aspects of long-term illnesses but many are not designed to meet the specific needs of people with dementia or their carers. This case study explores the barriers experienced when co-producing a memory and reminiscence app. A focus group and interviews were conducted with patient/carer dyads, an occupational therapist, project manager and software engineer involved in the design of the app. Data was analysed thematically using the framework approach. Several limitations such as poor technical knowledge and skills, negative attitudes and inaccurate perceptions of people with dementia slowed down or changed how the mobile app was developed. Compromises also had to be made over the final design of the app. More research to explore how mobile apps are co-designed with patients is needed.

  2. NREL Evaluates Performance of Fast-Charge Electric Buses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2016-09-16

    This real-world performance evaluation is designed to enhance understanding of the overall usage and effectiveness of electric buses in transit operation and to provide unbiased technical information to other agencies interested in adding such vehicles to their fleets. Initial results indicate that the electric buses under study offer significant fuel and emissions savings. The final results will help Foothill Transit optimize the energy-saving potential of its transit fleet. NREL's performance evaluations help vehicle manufacturers fine-tune their designs and help fleet managers select fuel-efficient, low-emission vehicles that meet their bottom line and operational goals. help Foothill Transit optimize the energy-saving potentialmore » of its transit fleet. NREL's performance evaluations help vehicle manufacturers fine-tune their designs and help fleet managers select fuel-efficient, low-emission vehicles that meet their bottom line and operational goals.« less

  3. Software engineering and Ada in design

    NASA Technical Reports Server (NTRS)

    Oneill, Don

    1986-01-01

    Modern software engineering promises significant reductions in software costs and improvements in software quality. The Ada language is the focus for these software methodology and tool improvements. The IBM FSD approach, including the software engineering practices that guide the systematic design and development of software products and the management of the software process are examined. The revised Ada design language adaptation is revealed. This four level design methodology is detailed including the purpose of each level, the management strategy that integrates the software design activity with the program milestones, and the technical strategy that maps the Ada constructs to each level of design. A complete description of each design level is provided along with specific design language recording guidelines for each level. Finally, some testimony is offered on education, tools, architecture, and metrics resulting from project use of the four level Ada design language adaptation.

  4. Automated dredging and disposal alternatives management system (ADDAMS). Environmental effects of dredging. Technical note

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This technical note describes the current capabilities and availability of the Automated Dredging and Disposal Alternatives Management System (ADDAMS). The technical note replaces the earlier Technical Note EEDP-06-12, which should be discarded. Planning, design, and management of dredging and dredged material disposal projects often require complex or tedious calculations or involve complex decision-making criteria. In addition, the evaluations often must be done for several disposal alternatives or disposal sites. ADDAMS is a personal computer (PC)-based system developed to assist in making such evaluations in a timely manner. ADDAMS contains a collection of computer programs (applications) designed to assist in managingmore » dredging projects. This technical note describes the system, currently available applications, mechanisms for acquiring and running the system, and provisions for revision and expansion.« less

  5. Endoscopic duodenal stent versus surgical gastrojejunostomy for gastric outlet obstruction in patients with advanced pancreatic cancer.

    PubMed

    Uemura, Shinya; Iwashita, Takuji; Iwata, Keisuke; Mukai, Tsuyoshi; Osada, Shinji; Sekino, Takafumi; Adachi, Takahito; Kawai, Masahiko; Yasuda, Ichiro; Shimizu, Masahito

    2018-05-03

    Malignant gastric outlet obstruction (GOO) often develops in patients with advanced pancreatic cancer (APC). It is not clear whether endoscopic duodenal stenting (DS) or surgical gastrojejunostomy (GJJ) is preferable as palliative treatment. To compare the efficacy and safety of GJJ and DS for GOO with APC. Consecutive 99 patients who underwent DS or GJJ for GOO with APC were evaluated. We compared the technical and clinical success rates, the incidence of adverse event (AE), the time to start chemotherapy and discharge and survival durations between DS and GJJ. Prognostic factors for overall survival (OS) were investigated on the multivariate analysis. GOO was managed with GJJ in 35 and DS in 64. The technical and clinical success rates were comparable. DS was associated with shorter time to start oral intake and earlier chemotherapy start and discharge. No difference was seen in the early and late AE rates. Multivariate analyses of prognostic factors for OS showed that performance status ≧2, administration of chemotherapy, and presence of obstructive jaundice to be significant factors. There were no significant differences in survival durations between the groups, regardless of the PS. There were no significant differences in the technical and clinical success and AE rates and survival duration between DS and GJJ in management of GOO by APC. DS may be a preferable option over GJJ given that it will lead to an earlier return to oral intake, a shortened length of hospital stay, and finally an earlier referral for chemotherapy. Copyright © 2018 IAP and EPC. Published by Elsevier B.V. All rights reserved.

  6. THE WIDE-AREA ENERGY STORAGE AND MANAGEMENT SYSTEM PHASE II Final Report - Flywheel Field Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.

    2010-08-31

    This research was conducted by Pacific Northwest National Laboratory (PNNL) operated for the U.S. department of Energy (DOE) by Battelle Memorial Institute for Bonneville Power Administration (BPA), California Institute for Energy and Environment (CIEE) and California Energy Commission (CEC). A wide-area energy management system (WAEMS) is a centralized control system that operates energy storage devices (ESDs) located in different places to provide energy and ancillary services that can be shared among balancing authorities (BAs). The goal of this research is to conduct flywheel field tests, investigate the technical characteristics and economics of combined hydro-flywheel regulation services that can be sharedmore » between Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) controlled areas. This report is the second interim technical report for Phase II of the WAEMS project. This report presents: 1) the methodology of sharing regulation service between balancing authorities, 2) the algorithm to allocate the regulation signal between the flywheel and hydro power plant to minimize the wear-and-tear of the hydro power plants, 3) field results of the hydro-flywheel regulation service (conducted by the Beacon Power), and 4) the performance metrics and economic analysis of the combined hydro-flywheel regulation service.« less

  7. Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

    NASA Technical Reports Server (NTRS)

    Graham, Scott R.

    2015-01-01

    The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agency-wide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

  8. Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

    NASA Technical Reports Server (NTRS)

    Graham, Scott R.

    2014-01-01

    The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agencywide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

  9. 78 FR 58460 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ...EPA is finalizing a limited approval and limited disapproval of two permitting rules submitted by California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on February 22, 2013 and concern construction and modification of stationary sources of air pollution within each District. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA). Final approval of these rules makes the rules federally enforceable and corrects program deficiencies identified in a previous EPA rulemaking (76 FR 44809, July 27, 2011). EPA is also making a technical amendment to the Code of Federal Regulations (CFR) to reflect this previous rulemaking, which removed an obsolete provision from the California SIP.

  10. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  11. 7 CFR 614.10 - Appeals before the Farm Service Agency county committee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... section are completed, provide the FSA county committee with a written technical determination in the form... part 780, a participant may appeal a final technical determination or a program decision to the FSA... appeal requests review of the technical determination by the applicable State Conservationist prior to...

  12. 77 FR 47495 - Final Priority; Technical Assistance on State Data Collection, Analysis, and Reporting-National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... intervention and preschool service providers with data on their qualifications, certification, and preparation... Priority; Technical Assistance on State Data Collection, Analysis, and Reporting--National IDEA Technical Assistance Center on Early Childhood Longitudinal Data Systems; Rule #0;#0;Federal Register / Vol. 77, No...

  13. 77 FR 18716 - Transportation Security Administration Postal Zip Code Change; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... organizational changes and it has no substantive effect on the public. DATES: Effective March 28, 2012. FOR... No. 1572-9] Transportation Security Administration Postal Zip Code Change; Technical Amendment AGENCY: Transportation Security Administration, DHS. ACTION: Final rule. SUMMARY: This rule is a technical change to...

  14. Adapting a Psychosocial Intervention for Smartphone Delivery to Middle-Aged and Older Adults with Serious Mental Illness.

    PubMed

    Whiteman, Karen L; Lohman, Matthew C; Gill, Lydia E; Bruce, Martha L; Bartels, Stephen J

    2017-08-01

    To describe the process of adapting an integrated medical and psychiatric self-management intervention to a smartphone application for middle-aged and older adults with serious mental illness using an adaptive systems engineering framework and user-centered design. First, we determined the technical abilities and needs of middle-aged and older adults with serious mental illnesses using smartphones. Then, we developed smartphone content through principles of user-centered design and modified an existing smartphone platform. Finally, we conducted a usability test using "think aloud" and verbal probing. We adapted a psychosocial self-management intervention to a smartphone application and tested its usability. Ten participants (mean age: 55.3 years, SD: 6.2 years) with serious mental illness and comorbid chronic health conditions reported a high level of usability and satisfaction with the smartphone application. Middle-aged and older adults with serious mental illness and limited technical abilities were able to participate in a process involving user-centered design and adaptation of a self-management intervention to be delivered by a smartphone. High usability ratings suggest that middle-aged and older adults with serious mental illness have the potential to use tailored smartphone interventions. Future research is indicated to establish effectiveness and to determine the type and intensity of clinical support needed to successfully implement smartphone applications as a component of community-based services for older adults with psychiatric and medical conditions. Copyright © 2017 American Association for Geriatric Psychiatry. Published by Elsevier Inc. All rights reserved.

  15. Waste-water characterization and hazardous-waste technical assistance survey, Mather AFB California. Final report, 28 November-9 December 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott, S.P.; Hedgecock, N.S.

    1989-10-01

    Personnel from the AFOEHL conducted a waste-water characterization and hazardous-waste technical assistance survey at MAFB from 28 Nov to 9 Dec 1988. The scope of this survey was to characterize the waste-water, address hazardous-waste-management practices, and explore opportunities for hazardous waste minimization. The waste water survey team analyzed the base's industrial effluent, effluent from oil/water separators, and storm water. The team performed a shop-by-shop evaluation of chemical-waste-management practices. Survey results showed that MAFB needs to improve its hazardous-waste-management program. Recommendations for improvement include: (1) Collecting two additional grab samples on separate days from the hospital discharge. Analyze for EPA Methodmore » 601 to determine if the grab sample from the survey gives a true indication of what is being discharged. (2) Locate the source and prevent mercury from the hospital from discharging into the sanitary sewer. (3) Dilute the soaps used for cleaning at the Fuels Lab, Building 7060. (4) Investigate the source of chromium from the Photo Lab. (5) Clean out the sewer system manhole directly downgradient from the Photo Lab. (6) Locate the source of contamination in the West Ditch Outfall. (7) Reconnect the two oil/water separators that discharge into the storm sewerage system. (8) Investigate the source of methylene chloride coming on the base. (9) Investigate the source of mercury at Fuel Cell Repair, building 7005.« less

  16. Accessorizing Building Science – A Web Platform to Support Multiple Market Transformation Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Madison, Michael C.; Antonopoulos, Chrissi A.; Dowson, Scott T.

    As demand for improved energy efficiency in homes increases, builders need information on the latest findings in building science, rapidly ramping-up energy codes, and technical requirements for labeling programs. The Building America Solution Center is a Department of Energy (DOE) website containing hundreds of expert guides designed to help residential builders install efficiency measures in new and existing homes. Builders can package measures with other media for customized content. Website content provides technical support to market transformation programs such as ENERGY STAR and has been cloned and adapted to provide content for the Better Buildings Residential Program. The Solution Centermore » uses the Drupal open source content management platform to combine a variety of media in an interactive manner to make information easily accessible. Developers designed a unique taxonomy to organize and manage content. That taxonomy was translated into web-based modules that allow users to rapidly traverse structured content with related topics, and media. We will present information on the current design of the Solution Center and the underlying technology used to manage the content. The paper will explore development of features, such as “Field Kits” that allow users to bundle and save content for quick access, along with the ability to export PDF versions of content. Finally, we will discuss development of an Android based mobile application, and a visualization tool for interacting with Building Science Publications that allows the user to dynamically search the entire Building America Library.« less

  17. Risk Management of NASA Projects

    NASA Technical Reports Server (NTRS)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  18. Status of ITER Cryodistribution and Cryoline project

    NASA Astrophysics Data System (ADS)

    Sarkar, B.; Vaghela, H.; Shah, N.; Bhattacharya, R.; Choukekar, K.; Patel, P.; Kapoor, H.; Srinivasa, M.; Chang, H. S.; Badgujar, S.; Monneret, E.

    2017-02-01

    The system of ITER Cryodistribution (CD) and Cryolines (CLs) is an integral interface between the Cryoplant systems and the superconducting (SC) magnets as well as Cryopumps (CPs). The project has progressed from the conceptual stage to the industrial stage. The subsystems are at various stages of design as defined by the project, namely, preliminary design, final design and formal reviews. Significant progresses have been made in the prototypes studies and design validations, such as the CL and cold circulators. While one of the prototype CL is already tested, the other one is in manufacturing phase. Performance test of two cold circulators have been completed. Design requirements are unique due the complexity arising from load specifications, layout constraints, regulatory compliance, operating conditions as well as several hundred interfaces. The present status of the project in terms of technical achievements, implications of the changes and the technical management as well as the risk assessment and its mitigation including path forward towards realization is described.

  19. Technical and Regulatory Considerations in Using Freight Containers as Industrial Packages

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hawk, Mark B; Opperman, Erich; Natali, Ronald

    2008-01-01

    The US Department of Energy (DOE), Office of Environmental Management (EM), is actively pursuing activities to reduce the radiological risk and clean up the environmental legacy of the nation's nuclear weapons programmes. The EM has made significant progress in recent years in the clean-up and closure of sites and is also focusing on longer term activities necessary for the completion of the clean-up programme. The packaging and transportation of contaminated demolition debris and low level waste materials in a safe and cost effective manner are essential in completing this mission. Toward this end, the US Department of Transportation's Final Rulemore » on Hazardous Materials Regulation issued on 26 January 2004, included a new provision authorising the use of freight containers (e.g. 20 and 40 ft ISO containers) as industrial packages type 2 or 3. This paper will discuss the technical and regulatory considerations in using these newly authorised and large packages for the packaging and transportation of low level waste materials.« less

  20. Computational sciences in the upstream oil and gas industry

    PubMed Central

    Halsey, Thomas C.

    2016-01-01

    The predominant technical challenge of the upstream oil and gas industry has always been the fundamental uncertainty of the subsurface from which it produces hydrocarbon fluids. The subsurface can be detected remotely by, for example, seismic waves, or it can be penetrated and studied in the extremely limited vicinity of wells. Inevitably, a great deal of uncertainty remains. Computational sciences have been a key avenue to reduce and manage this uncertainty. In this review, we discuss at a relatively non-technical level the current state of three applications of computational sciences in the industry. The first of these is seismic imaging, which is currently being revolutionized by the emergence of full wavefield inversion, enabled by algorithmic advances and petascale computing. The second is reservoir simulation, also being advanced through the use of modern highly parallel computing architectures. Finally, we comment on the role of data analytics in the upstream industry. This article is part of the themed issue ‘Energy and the subsurface’. PMID:27597785

  1. [Multilevel analysis of the technical efficiency of hospitals in the Spanish National Health System by property and type of management].

    PubMed

    Pérez-Romero, Carmen; Ortega-Díaz, M Isabel; Ocaña-Riola, Ricardo; Martín-Martín, José Jesús

    2018-05-11

    To analyze technical efficiency by type of property and management of general hospitals in the Spanish National Health System (2010-2012) and identify hospital and regional explanatory variables. 230 hospitals were analyzed combining data envelopment analysis and fixed effects multilevel linear models. Data envelopment analysis measured overall, technical and scale efficiency, and the analysis of explanatory factors was performed using multilevel models. The average rate of overall technical efficiency of hospitals without legal personality is lower than hospitals with legal personality (0.691 and 0.876 in 2012). There is a significant variability in efficiency under variable returns (TE) by direct, indirect and mixed forms of management. The 29% of the variability in TE es attributable to the Region. Legal personality increased the TE of the hospitals by 11.14 points. On the other hand, most of the forms of management (different to those of the traditional hospitals) increased TE in varying percentages. At regional level, according to the model considered, insularity and average annual income per household are explanatory variables of TE. Having legal personality favours technical efficiency. The regulatory and management framework of hospitals, more than public or private ownership, seem to explain technical efficiency. Regional characteristics explain the variability in TE. Copyright © 2018 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  2. Do technical skills correlate with non-technical skills in crisis resource management: a simulation study.

    PubMed

    Riem, N; Boet, S; Bould, M D; Tavares, W; Naik, V N

    2012-11-01

    Both technical skills (TS) and non-technical skills (NTS) are key to ensuring patient safety in acute care practice and effective crisis management. These skills are often taught and assessed separately. We hypothesized that TS and NTS are not independent of each other, and we aimed to evaluate the relationship between TS and NTS during a simulated intraoperative crisis scenario. This study was a retrospective analysis of performances from a previously published work. After institutional ethics approval, 50 anaesthesiology residents managed a simulated crisis scenario of an intraoperative cardiac arrest secondary to a malignant arrhythmia. We used a modified Delphi approach to design a TS checklist, specific for the management of a malignant arrhythmia requiring defibrillation. All scenarios were recorded. Each performance was analysed by four independent experts. For each performance, two experts independently rated the technical performance using the TS checklist, and two other experts independently rated NTS using the Anaesthetists' Non-Technical Skills score. TS and NTS were significantly correlated to each other (r=0.45, P<0.05). During a simulated 5 min resuscitation requiring crisis resource management, our results indicate that TS and NTS are related to one another. This research provides the basis for future studies evaluating the nature of this relationship, the influence of NTS training on the performance of TS, and to determine whether NTS are generic and transferrable between crises that require different TS.

  3. Positioning activated carbon amendment technologies in a novel framework for sediment management.

    PubMed

    Kupryianchyk, Darya; Rakowska, Magdalena I; Reible, Danny; Harmsen, Joop; Cornelissen, Gerard; van Veggel, Marc; Hale, Sarah E; Grotenhuis, Tim; Koelmans, Albert A

    2015-04-01

    Contaminated sediments can pose serious threats to human health and the environment by acting as a source of toxic chemicals. The amendment of contaminated sediments with strong sorbents like activated C (AC) is a rapidly developing strategy to manage contaminated sediments. To date, a great deal of attention has been paid to the technical and ecological features and implications of sediment remediation with AC, although science in this field still is rapidly evolving. This article aims to provide an update on the recent literature on these features, and provides a comparison of sediment remediation with AC to other sediment management options, emphasizing their full-scale application. First, a qualitative overview of advantages of current alternatives to remediate contaminated sediments is presented. Subsequently, AC treatment technology is critically reviewed, including current understanding of the effectiveness and ecological safety for the use of AC in natural systems. Finally, this information is used to provide a novel framework for supporting decisions concerning sediment remediation and beneficial reuse. © 2015 SETAC.

  4. Adapting the design of Anesthesia Information Management Systems to innovations depicted in Industrial Property documents.

    PubMed

    Spyropoulos, B; Tzavaras, A; Zogogianni, D; Botsivaly, M

    2013-01-01

    The purpose of this paper is to present the design and the current development status of an Anesthesia Information Management System (AIMS). For this system, the physical and technical advances, depicted in relevant, recently published Industrial Property documents, have been taken into account. Additional innovative sensors create further data-load to be managed. Novel wireless data-transmission modes demand eventually compliance to further proper standards, so that interoperability between AIMS and the existing Hospital Information Systems is being sustained. We attempted to define, the state-of-the-art concerning the functions, the design-prerequisites and the relevant standards and of an "emerging" AIMS that is combining hardware innovation, real-time data acquisition, processing and displaying and lastly enabling the necessary interoperability with the other components of the existing Hospital Information Systems. Finally, we report based on this approach, about the design and implementation status, of our "real-world" system under development and discuss the multifarious obstacles encountered during this still on-going project.

  5. Regulatory Supervision of Radiological Protection in the Russian Federation as Applied to Facility Decommissioning and Site Remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sneve, M.K.; Shandala, N.K.

    2007-07-01

    The Russian Federation is carrying out major work to manage the legacy of exploitation of nuclear power and use of radioactive materials. This paper describes work on-going to provide enhanced regulatory supervision of these activities as regards radiological protection. The scope includes worker and public protection in routine operation; emergency preparedness and response; radioactive waste management, including treatment, interim storage and transport as well as final disposal; and long term site restoration. Examples examined include waste from facilities in NW Russia, including remediation of previous shore technical bases (STBs) for submarines, spent fuel and radioactive waste management from ice-breakers, andmore » decommissioning of Radio-Thermal-Generators (RTGs) used in navigational devices. Consideration is given to the identification of regulatory responsibilities among different regulators; development of necessary regulatory instruments; and development of regulatory procedures for safety case reviews and compliance monitoring and international cooperation between different regulators. (authors)« less

  6. Examining the Impact of Non-Technical Security Management Factors on Information Security Management in Health Informatics

    ERIC Educational Resources Information Center

    Imam, Abbas H.

    2013-01-01

    Complexity of information security has become a major issue for organizations due to incessant threats to information assets. Healthcare organizations are particularly concerned with security owing to the inherent vulnerability of sensitive information assets in health informatics. While the non-technical security management elements have been at…

  7. Studying the Cost and Value of Library Services: Final Report. Technical Report APLAB/94-3/1,2,3,4.

    ERIC Educational Resources Information Center

    Kantor, Paul B.; And Others

    This is the final technical report (in three parts) of a 15-month long project to study the costs and value of library functions at five major research libraries. Twenty-one services or service aspects were studied, and numerous measures of the importance or benefit of the service to the users were made. These measures were studied together to lay…

  8. An Inquiry into Testing of Information Retrieval Systems. Comparative Systems Laboratory Final Technical Report, Part III: CSL Related Studies.

    ERIC Educational Resources Information Center

    Zull, Carolyn Gifford, Ed.; And Others

    This third volume of the Comparative Systems Laboratory (CSL) Final Technical Report is a collection of relatively independent studies performed on CSL materials. Covered in this document are studies on: (1) properties of files, including a study of the growth rate of a dictionary of index terms as influenced by number of documents in the file and…

  9. Programs of Study as a State Policy Mandate: A Longitudinal Study of the South Carolina Personal Pathways to Success Initiative. Unabridged Final Technical Report (Years 1-5)

    ERIC Educational Resources Information Center

    Hammond, Cathy; Withington, Cairen; Sharp, Julia L.; Mobley, Catherine; Drew, Sam F.; Stringfield, Samuel C.; Stipanovic, Natalie; Swiger, Caroline M.; Daugherty, Lindsay; Griffith, Cathy

    2014-01-01

    This final report presents findings from data collection and analysis conducted during a five-year study by the National Dropout Prevention Center (NDPC) at Clemson University, in conjunction with colleagues from the National Research Center for Career and Technical Education (NRCCTE) at the University of Louisville. This project was one of three…

  10. Ground-Based Radiometric Measurements of Slant Path Attenuation in the V/W Bands

    DTIC Science & Technology

    2016-04-01

    GROUND-BASED RADIOMETRIC MEASUREMENTS OF SLANT PATH ATTENUATION IN THE V/W BANDS APRIL 2016 FINAL TECHNICAL REPORT APPROVED FOR PUBLIC RELEASE...2. REPORT TYPE FINAL TECHNICAL REPORT 3. DATES COVERED (From - To) OCT 2012 – SEP 2015 4. TITLE AND SUBTITLE GROUND-BASED RADIOMETRIC MEASUREMENTS ...SUPPLEMENTARY NOTES 14. ABSTRACT Ground-based radiometric techniques were applied to measure the slant path attenuation cumulative distribution function to

  11. Final Technical Progress Report: Development of Low-Cost Suspension Heliostat; December 7, 2011 - December 6, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bender, W.

    2013-01-01

    Final technical progress report of SunShot Incubator Solaflect Energy. The project succeeded in demonstrating that the Solaflect Suspension Heliostat design is viable for large-scale CSP installations. Canting accuracy is acceptable and is continually improving as Solaflect improves its understanding of this design. Cost reduction initiatives were successful, and there are still many opportunities for further development and further cost reduction.

  12. The Leadership Improvement Modules of the Precommissioning Leadership Assessment Program

    DTIC Science & Technology

    1986-02-01

    Institute - Patricia Knight Davis Development Dimensions International DTIC ELECTE SEP 0 3W U5 D Leadership and Management Technical Area Manpower and... Management skills Development Management training Interpersonal skills Remedial training Leadership skills Role playing IL ASISRACT (Cl -ewi rebb emem II by...Burke Army Research Institute Patricia Knight Davis Development Dimensions International Leadership and Management Technical Area William W. Haythorn

  13. USAF/SCEEE Graduate Student Summer Support Program (1982). Management and Technical Report.

    DTIC Science & Technology

    1982-10-01

    AD-A130 767 USAF/SCEEE GRADUATE STUDENT SUMMER SUPPORT PROGRAM (1982) MANAGEMENT AND..(U) SOUTHEASTERN CENTER FORELECTRICAL ENGINEERING EDUCATION INC...SUMMER SUPPORT PROGRAM Conducted by Southeastern Center for Electrical Engineering Education under USAF Contract Number F49620-82-C-0035 MANAGEMENT ...UNITED STATES AIR FORCE GRADUATE STUDENT SL24MER SUPPORT PROGRAM 1982 PROGRAM MANAGEMENT AND TECHNICAL REPORT SOUTHEASTERN CENTER FOR ELECTRICAL

  14. Installation Restoration Program Preliminary Assessment, Big Mountain Radio Relay Station, Alaska

    DTIC Science & Technology

    1989-04-01

    DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design, project management and implementation of various...management functions, as well as direct involvement in project marketing, corporate computer and CAD operations, and company R&D efforts. 5 DETOX , Inc...interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as sale and management of several substantial and

  15. Fundamental dilemmas in contemporary psychotherapy: a transtheoretical concept.

    PubMed

    Scaturo, Douglas J

    2002-01-01

    The transtheoretical nature of fundamental dilemmas in contemporary psychotherapy is explored. The basic distinction between technical and ethical dilemmas in clinical practice is discussed, as well as the ramifications for the psychotherapist. Clinical dilemmas identified by survey research studies and interviews with master psychotherapists are reviewed. In addition to dilemmas relevant to circumscribed areas of psychotherapy, such as brief therapy, managed mental health care, sexual questions, feminist therapy, dilemmas fundamental to the psychotherapeutic process as a whole are examined. Finally, clinical examples are provided that include such issues as hospitalization of the suicidal patient, dealing with known contraindications, treating the intractable patient, and self-care of the psychotherapist.

  16. Information management in an integrated space telerobot

    NASA Technical Reports Server (NTRS)

    Dipippo, S.; Pasquariello, G.; Labini, G. Sylos

    1989-01-01

    The in-orbit operations, like space structures inspection, servicing and repairing, is expected to be one of the most significant technological area for application and development of Robotics and Automation in Space Station environment. The Italian National Space Plan (PSN) has started up its strategic programme SPIDER (Space Inspection Device for Extravehicular Repairs), which is scheduled in three phases, with the final goal of performing docking and precision repairing in the Space Station environment. SPIDER system is an autonomous integrated space robot, using mature Artificial Intelligence tools and technics for its operational control. The preliminary results of a study on the information architecture of the spacecraft are described.

  17. Obtaining Technical Support for Superfund, RCRA and Brownfields Site Issues Fact Sheet

    EPA Pesticide Factsheets

    EPA’s Technical Support Centers (TSCs) and other technical support services are available to Regional RemedialProject Managers, Corrective Action Staff, and On-Scene Coordinators needing specialized technical expertisefor specific tasks or projects.

  18. SPS energy conversion and power management workshop. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    In 1977 a four year study, the concept Development and Evaluation Program, was initiated by the US Department of Energy and the National Aeronautics and Space Administration. As part of this program, a series of peer reviews were carried out within the technical community to allow available information on SPS to be sifted, examined and, if need be, challenged. The SPS Energy Conversion and Power Management Workshop, held in Huntsville, Alabama, February 5 to 7, 1980, was one of these reviews. The results of studies in this particular field were presented to an audience of carefully selected scientists and engineers.more » This first report summarizes the results of that peer review. It is not intended to be an exhaustive treatment of the subject. Rather, it is designed to look at the SPS energy conversion and power management options in breadth, not depth, to try to foresee any troublesome and/or potentially unresolvable problems and to identify the most promising areas for future research and development. Topics include photovoltaic conversion, solar thermal conversion, and electric power distribution processing and power management. (WHK)« less

  19. A self-assessment of the propensity to obtain future employment: a case of final-year engineering students at the University of Botswana

    NASA Astrophysics Data System (ADS)

    Ssegawa, Joseph K.; Kasule, Daniel

    2017-09-01

    The article provides a self-assessment by final-year engineering students at the University of Botswana regarding the propensity to get employment. Students rated which employability attributes are important, the level of attainment and the sources that have facilitated the development of the attributes. Results indicated that students identified the most important attributes as management of time; possessing a high level of technical skills, meeting deadlines and creating viable solutions for solving a problem. They also indicated that they have weaknesses in managing time, meeting deadlines and creating viable solutions (attributes critical to the engineering profession). Students reported that their strengths were in having a positive attitude, orderly physical presentation, adaptation to new environments and willingness to learn new ideas. Students further noted that they developed the attributes from the university academic system followed by their own private activities. The study concludes that students lacked some of the critical attributes of engineering. They therefore, need to be explicitly and holistically sensitised as to how the attributes relate to their profession, employment and career development. As part of the review of the engineering programmes, sensitisation could be included in the induction process at enrolment.

  20. Core Technical Capability Laboratory Management System

    NASA Technical Reports Server (NTRS)

    Shaykhian, Linda; Dugger, Curtis; Griffin, Laurie

    2008-01-01

    The Core Technical Capability Lab - oratory Management System (CTCLMS) consists of dynamically generated Web pages used to access a database containing detailed CTC lab data with the software hosted on a server that allows users to have remote access.

  1. Technical Evaluation Motor No. 7 (TEM-7)

    NASA Technical Reports Server (NTRS)

    Hughes, Phil

    1991-01-01

    The Technical Evaluation Motor No. 7 (TEM-7) test was a full-scale, full duration static test firing of a high performance motor-configuration solid rocket motor with nozzle vectoring. The final test report documents the procedures, performance, and results of the static test firing of TEM-7. All observations, discussions, conclusions, and recommendations included in the report are complete and final except for the TEM-7 fixed housing unbond investigation. A presentation and discussion of TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107, Rev A, Space Shuttle Technical Evaluation Motor No. 7 (TEM-7) Static Fire Test Plan are included.

  2. Building Stronger State Energy Partnerships with the U.S. Department of Energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marks, Kate

    2011-09-30

    This final technical report details the results of total work efforts and progress made from October 2007 – September 2011 under the National Association of State Energy Officials (NASEO) cooperative agreement DE-FC26-07NT43264, Building Stronger State Energy Partnerships with the U.S. Department of Energy. Major topical project areas in this final report include work efforts in the following areas: Energy Assurance and Critical Infrastructure, State and Regional Technical Assistance, Regional Initiative, Regional Coordination and Technical Assistance, and International Activities in China. All required deliverables have been provided to the National Energy Technology Laboratory and DOE program officials.

  3. Final Technical Report of Project DE-FG02-96ER14647

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lundeen, Stephen R.

    This is the final technical report of work completed under DOE support over the period Sept. 1, 1996 until May 31, 2015. The title of the project was "Ion/Excited Atom Collision Studies with a Rydberg Target and a CO2 Laser" from 9/1/96 to 10/31/06, and "Properties of Actinide Ions from Measurements of Rydberg Ion Fine Structure" from 11/1/06 until 5/31/15. The primary technical results were a detailed experimental study of resonant charge transfer between Rydberg atoms and highly-charged ions, and unique measurements of many properties of multiply-charged Thorium ions.

  4. The non-technical skills used by anaesthetic technicians in critical incidents reported to the Australian Incident Monitoring System between 2002 and 2008.

    PubMed

    Rutherford, J S; Flin, R; Irwin, A

    2015-07-01

    The outcome of critical incidents in the operating theatre has been shown to be influenced by the behaviour of anaesthetic technicians (ATs) assisting anaesthetists, but the specific non-technical skills involved have not been described. We performed a review of critical incidents (n=1433) reported to the Australian Incident Monitoring System between 2002 and 2008 to identify which non-technical skills were used by ATs. The reports were assessed if they mentioned anaesthetic assistance or had the boxes ticked to identify "inadequate assistance" or "absent supervision or assistance". A total of 90 critical incidents involving ATs were retrieved, 69 of which described their use of non-technical skills. In 20 reports, the ATs ameliorated the critical incident, whilst in 46 they exacerbated the critical incident, and three cases had both positive and negative non-technical skills described. Situation awareness was identified in 39 reports, task management in 23, teamwork in 21 and decision-making in two, but there were no descriptions of issues related to leadership, stress or fatigue management. Situation awareness, task management and teamwork appear to be important non-technical skills for ATs in the development or management of critical incidents in the operating theatre. This analysis has been used to support the development of a non-technical skills taxonomy for anaesthetic assistants.

  5. How to manage without being a manager

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sweeney, M.A.

    1997-06-01

    In the author`s current position at Sandia National Laboratories within the Pulsed Power Sciences Center, much of the author`s time is spent in composing short (one page) technical reports and long (> 20 page) technical contracts and program plans for transmission to the Department of Energy and to upper management and also in reviewing long technical documents for accuracy. A major requirement of these efforts is to complete them on a timely basis, often within a few hours or a few days. In this talk, the author reveals some communication {open_quotes}secrets{close_quotes} that have been learned. The idea behind these twelvemore » {open_quotes}secrets{close_quotes} is to get the answers you, as a nonmanager, need quickly from a manager without creating stress either on your part or the manager`s part.« less

  6. 78 FR 34392 - Guidance for Industry and Food and Drug Administration Staff: Technical Considerations for Pen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ...] Guidance for Industry and Food and Drug Administration Staff: Technical Considerations for Pen, Jet, and... availability of a final guidance document entitled ``Technical Considerations for Pen, Jet, and Related... developing information to support a marketing application for a pen, jet, or related injector device intended...

  7. Florida Study of Career and Technical Education. Final Report

    ERIC Educational Resources Information Center

    Jacobson, Louis; Mokher, Christine

    2014-01-01

    A key goal of the "Carl D. Perkins Career and Technical Education Act of 2006" ("Perkins IV") is to ensure career and technical education (CTE) programs are widely available for preparing high school and college students for "high skill, high wage, or high demand occupations in current or emerging professions"…

  8. Structural Health and Prognostics Management for Offshore Wind Plants; Final Report of Sandia R&D Activities.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffith, Daniel Todd

    2015-04-01

    This final report is a compilation of resear ch efforts - funded by the US Department of Energy Wind and Water Power Technolog ies Office over a four-year period from FY11 through FY14. The goals of this re search program were to develop and evaluate technical innovati ons with promise for maxi mizing revenues and reducing levelized cost of energy (LCOE) for offs hore wind plants - more specifically the goals of the Structural H ealth and Prognostics Management (SHPM) program were to reduce O&M costs and increase energy capture through use of SHPM-based technologies. A technology roadmap was devemore » loped at the start of the project to guide the research efforts. This roadmap identified and outlined six major research thrust areas each having five stages of ma turity. Research was conducted in each of these thrust areas, as documented throughout this report, although a major focus was on development of damage detection strategi es for the most frequent blade damage conditions and damage mitigation and life-exte nsion strategies via changes in turbine operations (smart loads management). Th e work summarized in this compilation report is the product of the work of many researchers. A summary of the major findings, status of the SHPM Technology Ro admap and recommendations for future work are also provided.« less

  9. Integrated Measurement of Crew Resource Management and Technical Flying Skills

    DOT National Transportation Integrated Search

    1993-08-01

    This report presents the findings of a study designed with two objectives: to produce a prototype performance : measurement instrument (PMI) that integrates the assessment of Crew Resource Management (CRM) and technical flying : skills and to investi...

  10. Improving Space Project Cost Estimating with Engineering Management Variables

    NASA Technical Reports Server (NTRS)

    Hamaker, Joseph W.; Roth, Axel (Technical Monitor)

    2001-01-01

    Current space project cost models attempt to predict space flight project cost via regression equations, which relate the cost of projects to technical performance metrics (e.g. weight, thrust, power, pointing accuracy, etc.). This paper examines the introduction of engineering management parameters to the set of explanatory variables. A number of specific engineering management variables are considered and exploratory regression analysis is performed to determine if there is statistical evidence for cost effects apart from technical aspects of the projects. It is concluded that there are other non-technical effects at work and that further research is warranted to determine if it can be shown that these cost effects are definitely related to engineering management.

  11. Technical Leadership Development Program

    DTIC Science & Technology

    2010-12-13

    the traditional tenets of leadership and management , systems thinking, understanding SOS issues, and thinking and acting holistically. Our research...international element 2.0 Enterprise Leadership and Management UNCLASSIFIED Contract Number: H98230-08-D-0171 DO 002. TO002, RT 004 Report No...mechanisms for leadership of the overall technical effort, for systems engineering, for requirements, management , and for systems integration. o Develop

  12. Managerial Competency Needs and Training Requests: The Case of the Spanish Tourist Industry.

    ERIC Educational Resources Information Center

    Agut, Sonia; Grau, Rosa

    2002-01-01

    A study analyzed the gap between required and existing management competency levels and acquired data on 80 Spanish hotel/restaurant managers' self-identified training needs. Deficits were found in 10 of 15 technical and 12 of 21 generic competencies. Managers requested training only in technical areas, not generic competencies. (Contains 42…

  13. Improving the U.S. Navy’s Execution of Technical Authority through a Common Risk Management and Technical Assessment Process

    DTIC Science & Technology

    2008-09-01

    ITP . Assessment Indicators: • Has the risk management team (RMT) provided a risk management plan (RMP)? − Does the RMP provide an organized...processes. Diskettes, which contain the necessary programs for accessing BMP◊NET from IBM -compatible or Macintosh computers with a modem, and answers to

  14. Final Technical Report for Award DESC0011912, "Trimodal Tapping Mode Atomic Force Microscopy: Simultaneous 4D Mapping of Conservative and Dissipative Probe-Sample Interactions of Energy-Relevant Materials”

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Solares, Santiago D.

    The final project report covering the period 7/1/14-6/30/17 provides an overview of the technical accomplishments in the areas of (i) fundamental viscoelasticity, (ii) multifrequency atomic force microscopy, and (iii) characterization of energy-relevant materials with atomic force microscopy. A list of publications supported by the project is also provided.

  15. Application of Knowledge-Based Techniques to Tracking Function

    DTIC Science & Technology

    2006-09-01

    38394041 42434445 46474849 505152 53545556 57585960 616263 646566 676869 707172 737475 7677 7879 8081 8283 8485 8687 8889 9091 9293 9495 969798 99100...Knowledge-based applications to adaptive space-time processing. Volume I: Summary”, AFRL-SN-TR-2001-146 Vol. I (of Vol. VI ), Final Technical Report, July...2001-146 Vol. IV (of Vol. VI ), Final Technical Report, July 2001. [53] C. Morgan, L. Moyer, “Knowledge-based applications to adaptive space-time

  16. Final Technical Report for contract number DE-FG02-05ER15670

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glazebrook, Jane

    This is the final technical report for contract number DE-FG02-05ER15670. The project is now complete, and results of the project have been published. Two papers were published based on work done in the last three-year funding period. The DOIs of these papers are included below. The abstracts of the papers, providing summaries of the work, are included in the body of the report.

  17. Astrobee Periodic Technical Review (PTR) Delta 3

    NASA Technical Reports Server (NTRS)

    Provencher, Christopher; Smith, Marion F.; Smith, Ernest Everett; Bualat, Maria Gabriele; Barlow, Jonathan Spencer

    2017-01-01

    Astrobee is a free flying robot for the inside of the International Space Station (ISS). The Periodic Technical Review (PTR) delta 3 is the final design review of the system presented to stakeholders.

  18. Polar source analysis : technical memorandum

    DOT National Transportation Integrated Search

    2017-09-29

    The following technical memorandum describes the development, testing and analysis of various polar source data sets. The memorandum also includes recommendation for potential inclusion in future releases of AEDT. This memorandum is the final deliver...

  19. 2005 v4.2 Technical Support Document

    EPA Pesticide Factsheets

    Technical Support Document for the Final Transport Rule describes how updated 2005 NEI, version 2 emissions and were processed for air quality modeling in support of the Cross-state Air Pollution Rule (CSAPR).

  20. Direct Final Rule for Technical Amendments for Marine Spark-Ignition Engines and Vessels

    EPA Pesticide Factsheets

    Rule published September 16, 2010 to make technical amendments to the design standard for portable marine fuel tanks. This rule incorporates safe recommended practices, developed through industry consensus.

  1. 24 CFR 964.220 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Technical assistance. 964.220....220 Technical assistance. (a) Financial assistance. HUD will provide financial assistance, to the extent available, to resident councils or resident management corporations for technical assistance and...

  2. RCRA Sustainable Materials Management Information

    EPA Pesticide Factsheets

    This asset includes a broad variety of documents, descriptive data, technical analyses and guidance materials relative to voluntary improvements in resource conservation, the beneficial use of sustainable materials and the management of non-hazardous wastes and materials. Included in this asset are participant information and outreach materials of various voluntary programs relating to better materials and waste management programs. An example is the WasteWise program and Sustainable Materials Management (SMM) Challenges, which help organizations and businesses apply sustainable materials management practices to reduce municipal and select industrial wastes. Also included in this asset are guidance materials to assist municipalities in recycling and reuse of municipal solid waste, including diverting materials to composting, and the use of conversion methods such as anaerobic digestion. Another component are the data necessary to compile reports on the characterization of municipal solid waste (including such waste streams as food waste, yard and wood waste, discarded electronics, and household non-hazardous waste), the recycled content of manufactured goods, and other analyses performed using such tools as the Waste Assessment Reduction Model (WARM).For industrial non-hazardous waste, this asset includes guidance and outreach materials on industrial materials recycling and waste minimization. Finally, this asset includes research analyses on sustainable materia

  3. Research on spatio-temporal database techniques for spatial information service

    NASA Astrophysics Data System (ADS)

    Zhao, Rong; Wang, Liang; Li, Yuxiang; Fan, Rongshuang; Liu, Ping; Li, Qingyuan

    2007-06-01

    Geographic data should be described by spatial, temporal and attribute components, but the spatio-temporal queries are difficult to be answered within current GIS. This paper describes research into the development and application of spatio-temporal data management system based upon GeoWindows GIS software platform which was developed by Chinese Academy of Surveying and Mapping (CASM). Faced the current and practical requirements of spatial information application, and based on existing GIS platform, one kind of spatio-temporal data model which integrates vector and grid data together was established firstly. Secondly, we solved out the key technique of building temporal data topology, successfully developed a suit of spatio-temporal database management system adopting object-oriented methods. The system provides the temporal data collection, data storage, data management and data display and query functions. Finally, as a case study, we explored the application of spatio-temporal data management system with the administrative region data of multi-history periods of China as the basic data. With all the efforts above, the GIS capacity of management and manipulation in aspect of time and attribute of GIS has been enhanced, and technical reference has been provided for the further development of temporal geographic information system (TGIS).

  4. The contractor`s role in low-level waste disposal facility application review and licensing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serie, P.J.; Dressen, A.L.

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department inmore » a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.« less

  5. Improving technical information use: what can be learnt from a manager's perspective?

    PubMed

    Jacobson, C; Lisle, A; Carter, R W; Hockings, M T

    2013-07-01

    Conservation practice reportedly suffers from low use of technical information. Understanding of factors that affect the influence of technical information on management decision-making is limited. We sought to identify leverage points for improved technical information dissemination in the New South Wales Parks and Wildlife Service, Australia, given the significant recent investments in monitoring and evaluation that had been made. We did so by exploring the inter-relationships between factors affecting the influence of different information types on management decisions. Results indicate that managers have a high inclination toward adaptive behavior, given they operate in an information poor environment. The most influential types of information were those that enabled interaction between information provider and recipient (e.g., staff experience and expertise). An analysis of the concordance in individuals' responses for different information types showed that neither accessibility nor organizational expectation of use was aligned with influence on decision-making. Alignment of responses also varied by work area. Raising expectations of information use or increasing access to particular types of information is therefore unlikely to result in an increase in influence on management decision-making. Rather than focussing on matching accessibility and expected use of particular information types, our results indicate that technical information uptake is best supported through existing peer networks tailored to specific work areas.

  6. Essential managerial skills for financial and budgetary management in medical universities: The top managers' perspective

    PubMed Central

    Javani, Ali; Abolhallaje, Masoud; Jafari, Javad; Fazl Hashemi, Seyed Mohammad Esmaeil

    2017-01-01

    Background: Achieving organizational objectives depends on the effectiveness of administrators. However, managerial efficacy largely depends on the knowledge and skills of managers. This study aimed at assessing the skills of financial and budget management of the Ministry of Health from the perspective of resource development assistants of universities of medical sciences nationwide. Methods: This cross- sectional study was conducted in 2012. Study participants were resource development assistants of universities of medical sciences in Iran. We adopted simple random sampling method in locating participants. Data were collected using pretested questionnaires and analyzed using descriptive statistics and Mann-Whitney test (as a non-parametric test) and Friedman test. Results: The highest mean recorded under financial management skills was technical skills (3.58±0.50), followed by human skills (3.50±.048), and perceptual skills (3.32±0.52). With regards to financial and budget management and performance monitoring, the means of technical skills, as prioritized by directors, was 3.72±0.71, followed by human skills (3.72±0.70), and perceptual skills (3.66±0.75). A significant association was found between perceptual skills of financial managers and budgeting and performance monitoring managers (p= 0.014). Conclusion: Operational level managers, such as financial and budgetary managers, need to acquire more technical skills. Therefore, we support activities that promote technical skills and awareness of managers within organizations, such as organizational training courses and distribution of educational materials like brochures.

  7. The critical attributes of leadership.

    PubMed

    Campbell, C A

    1992-11-01

    The final decade of this century is a period of unprecedented change that by all indicators will continue unabated well into the next millennium. This article explored some elemental and immutable truths about leadership, management, communication, and negotiation essential to organizational success, particularly during periods of accelerated change. The case is made for a level of integrity, ethical conduct, and self-control to match the technical competence essential for managerial success in a technologically intensive work environment. These attributes and skills coupled with a widening scope of institutional vision are critical to sustained leadership and growth in an unstable world. Those without these abilities will be diminished in their capacity to communicate or negotiate. Hence, they will be thwarted or powerless to create task attraction, to effect change, or to promote excellence. These lessons are applicable to the dynamic changes occurring within the health care industrial complex, including health information management.

  8. Nature and place of crime scene management within forensic sciences.

    PubMed

    Crispino, Frank

    2008-03-01

    This short paper presents the preliminary results of a recent study aimed at appreciating the relevant parameters required to qualify forensic science as a science through an epistemological analysis. The reader is invited to reflect upon references within a historical and logical framework which assert that forensic science is based upon two fundamental principles (those of Locard and Kirk). The basis of the assertion that forensic science is indeed a science should be appreciated not only on one epistemological criteria (as Popper's falsification raised by the Daubert hearing was), but also on the logical frameworks used by the individuals involved (investigator, expert witness and trier of fact) from the crime scene examination to the final interpretation of the evidence. Hence, it can be argued that the management of the crime scene should be integrated into the scientific way of thinking rather than remain as a technical discipline as recently suggested by Harrison.

  9. A Multidimensional View of Personal Health Systems for Underserved Populations

    PubMed Central

    Botts, Nathan E; Burkhard, Richard J

    2010-01-01

    The advent of electronic personal health records (PHR) provides a major opportunity to encourage positive health management practices, such as chronic disease management. Yet, to date there has been little attention toward the use of PHRs where advanced health information services are perhaps most needed, namely, in underserved communities. Drawing upon research conducted with safety net providers and patients, the authors propose a multi-level analytical framework for guiding actions aimed at fostering PHR adoption and utilization. The authors first outline distinctive user and technical requirements that need to be considered. Next, they assess organizational requirements necessary to implement PHRs within health systems bound by limited resources. Finally, the authors analyze the overriding health care policy context that can facilitate or thwart such efforts. The conclusion notes that heightened national attention toward health information technology and reform provides a significant opportunity for initiatives whose goal is to increase widepread access to PHRs. PMID:20685644

  10. Short-rotation management of Eucalyptus: Guidelines for plantations in Hawaii. Forest Service general technical report (Final)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitesell, C.D.; DeBell, D.S.; Schubert, T.H.

    1992-11-01

    A 10-year research and development program was conducted on the island of Hawaii, where nearly 230,000 acres are suitable for growing biomass in short-rotation Eucalyptus plantations. Successful techniques are described for seedling production, plantation establishment (site preparation, weed control, planting), maintenance (weed control, fertilization), biomass yield estimation, and harvest. Basic biological relationships are described to aid decisions on site selection, initial spacing, fertilizer schedules, and rotation length. Environmental issues likely to be faced by growers of Eucalyptus plantations are discussed, including soil erosion, nutrient depletion, and monocultures. Continuing programs for tree improvement, monitoring, and silviculture research are recommeded. Production costsmore » for biomass yields are estimated for three promising management regimes, representing pure Eucalyptus plantings at dense and wide spacings and a mixed species plantation where Albizia is used as a nurse crop to provide nitrogen needed for optimum Eucalyptus growth.« less

  11. Can Sisyphus succeed? Getting U.S. high-level nuclear waste into a geological repository.

    PubMed

    North, D Warner

    2013-01-01

    The U.S. government has the obligation of managing the high-level radioactive waste from its defense activities and also, under existing law, from civilian nuclear power generation. This obligation is not being met. The January 2012 Final Report from the Blue Ribbon Commission on America's Nuclear Future provides commendable guidance but little that is new. The author, who served on the federal Nuclear Waste Technical Review Board from 1989 to 1994 and subsequently on the Board on Radioactive Waste Management of the National Research Council from 1994 to 1999, provides a perspective both on the Commission's recommendations and a potential path toward progress in meeting the federal obligation. By analogy to Sisyphus of Greek mythology, our nation needs to find a way to roll the rock to the top of the hill and have it stay there, rather than continuing to roll back down again. © 2012 Society for Risk Analysis.

  12. Training and Maintaining System-Wide Reliability in Outcome Management.

    PubMed

    Barwick, Melanie A; Urajnik, Diana J; Moore, Julia E

    2014-01-01

    The Child and Adolescent Functional Assessment Scale (CAFAS) is widely used for outcome management, for providing real time client and program level data, and the monitoring of evidence-based practices. Methods of reliability training and the assessment of rater drift are critical for service decision-making within organizations and systems of care. We assessed two approaches for CAFAS training: external technical assistance and internal technical assistance. To this end, we sampled 315 practitioners trained by external technical assistance approach from 2,344 Ontario practitioners who had achieved reliability on the CAFAS. To assess the internal technical assistance approach as a reliable alternative training method, 140 practitioners trained internally were selected from the same pool of certified raters. Reliabilities were high for both practitioners trained by external technical assistance and internal technical assistance approaches (.909-.995, .915-.997, respectively). 1 and 3-year estimates showed some drift on several scales. High and consistent reliabilities over time and training method has implications for CAFAS training of behavioral health care practitioners, and the maintenance of CAFAS as a global outcome management tool in systems of care.

  13. 48 CFR 642.271 - Government Technical Monitor (GTM).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Government Technical... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.271 Government Technical Monitor (GTM). (a) Policy. The contracting officer may appoint a Government Technical Monitor (GTM...

  14. Development, Implementation, and Evaluation of Leadership/Management Training within Army Battalions. Volume 2. Technical Appendices

    DTIC Science & Technology

    1975-06-01

    8217- r AD-A012 774 DEVELOPMENT, IMPLEMENTATION, AND EVALUATION OF LEADERSHIP / MANAGEMENT TRAINING WITHIN ARMY BATTALIONS. VOLUME 2. TECHNICAL...and Identify by block numbera) This report describes the development and eva.L.uuLion of an experiential-based, leadership / management trai iing...organizational intervention and change similar to that presented in Figure H-1. According to this approach, training in more effective leadership / management skills

  15. Seattle To Portland Inter-City ITS Corridor Study And Communications Plan, Final Report

    DOT National Transportation Integrated Search

    1996-03-01

    THIS DOCUMENT IS THE FINAL REPORT PRESENTING THE SEATTLE TO PORTLAND INTELLIGENT TRANSPORTATION SYSTEM (ITS) EARLY DEPLOYMENT PLAN. THE FINAL REPORT SYNTHESIZES INFORMATION FROM TECHNICAL MEMORANDUMS 1 THROUGH 5; INCLUDING EXISTING AND FUTURE CONDITI...

  16. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  17. OBSIP: An Evolving Facility for the Future of Geoscience

    NASA Astrophysics Data System (ADS)

    Evers, B.; Aderhold, K.

    2015-12-01

    The Ocean Bottom Seismograph Instrument Pool "OBSIP" is a National Science Foundation (NSF) sponsored instrument facility that provides ocean bottom seismometers and technical support for research in the areas of marine geology, seismology, and geodynamics. OBSIP provides both short period instruments (for active source seismic refraction studies) and long period instruments (for long term passive experiments). OBSIP is comprised of three Institutional Instrument Contributors each of whom contribute instruments and technical support to the pool and an OBSIP Management Office. In 2015, OBSIP will provide instruments for six experiments and support nine research cruises recovering and/or deploying instruments. This includes the final recoveries for the Cascadia Initiative experiment and the Eastern North American Margin experiment, both multi-year community seismic experiments integrating large onshore and offshore deployments of instruments from multiple IICs. OBSIp supported additional experiments in New Zealand and Malawi, Africa. An active source experiment to image the magma plumbing of Santorini employs OBSIP's entire short period sensor pool. OBSIP is also incorporating new technical developments in the OBSIP fleet including long duration OBS technology, new shielding designs, and sensor upgrades. OBSIP continues to enable innovation in experiment design, instrument capabilities, and data return/QAQC tracking and adapts to the needs of a rapidly increasing and diversifying pool of users.

  18. Summary of a Gas Transport Tracer Test in the Deep Cerros Del Rio Basalts, Mesita del Buey, Los Alamos NM.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stauffer, Philip H.; Rahn, Thomas A.; Ortiz, John Philip

    Here we describe results from a tracer test in the Cerros del Rio basalt beneath Mesita del Buey, Technical Area 54 (TA-54) at Los Alamos National Laboratory (LANL or the Laboratory). This report follows from plans outlined in our previous Tracer Test Work Plan (LANL 2016). These activities were conducted by LANL to further characterize subsurface properties of the Cerros del Rio basalts at Material Disposal Area (MDA) L (Figure 1.1-1). The work presented follows from the “Interim Measures Work Plan for Soil-Vapor Extraction of Volatile Organic Compounds from Material Disposal Area L, Technical Area 54, Revision 1,” submitted tomore » the New Mexico Environment Department (NMED) in September 2014 (LANL 2014). Remediation of the MDA L vapor plume by soil-vapor extraction (SVE) is recommended as part of the final remedy in the “Corrective Measures Evaluation Report for Material Disposal Area L, Solid Waste Management Unit 54-006, at Technical Area 54, Revision 2” to meet a remedial action objective of preventing groundwater from being impacted above a regulatory standard by the transport of volatile organic compounds (VOCs) to groundwater through soil vapor (LANL 2011).« less

  19. Benchmark Analysis of Career and Technical Education in Lenawee County. Final Report.

    ERIC Educational Resources Information Center

    Hollenbeck, Kevin

    The career and technical education (CTE) provided in grades K-12 in the county's vocational-technical center and 12 local public school districts of Lenawee County, Michigan, was benchmarked with respect to its attention to career development. Data were collected from the following sources: structured interviews with a number of key respondents…

  20. 48 CFR 1352.215-70 - Proposal preparation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; justifications for noncompetitive proposed subcontracts; identification of technical data to be withheld; and any... evaluation factor.] Evaluation Factor 1—Technical Approach. Provide information on how the project is to be organized, staffed, and managed that demonstrates the offeror's understanding and effective management of...

  1. Security credentials management system (SCMS) design and analysis for the connected vehicle system : draft.

    DOT National Transportation Integrated Search

    2013-12-27

    This report presents an analysis by Booz Allen Hamilton (Booz Allen) of the technical design for the Security Credentials Management System (SCMS) intended to support communications security for the connected vehicle system. The SCMS technical design...

  2. Integrated corridor management initiative : demonstration phase evaluation – Dallas technical capability analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...

  3. International Project on Technical and Vocational Education (UNEVOC). International Advisory Committee (Third Session, Paris, France, October 2-4, 1995). Final Report = Projet International pour l'Enseignement Technique et Professionnel (UNEVOC). Comite Consultatif International (Troisieme Session, Paris, France, 2-4 octobre 1995). Rapport Final.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    The international advisory committee of the International Project on Technical and Vocational Education (UNEVOC) held its third session in Paris in October 1995. Advisory committee members and observers from the United Nations' specialized, intergovernmental, and nongovernmental organizations reviewed the major UNEVOC project activities undertaken…

  4. International Project on Technical and Vocational Education (UNEVOC). International Advisory Committee (Second Session, Paris, France, December 12-14, 1994). Final Report = Projet International pour l'Enseignement Technique et Professionnel (UNEVOC). Comite Consultatif International (Deuxieme Session, Paris, France, 12-14 decembre 1994). Rapport Final.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    The international advisory committee of the International Project on Technical and Vocational Education (UNEVOC) held its second session in Paris in December 1994. Nine advisory committee members and observers from the United Nations' specialized, intergovernmental, and nongovernmental organizations reviewed the major UNEVOC project activities…

  5. Final Technical Report for ARRA Funding

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rusack, Roger; Mans, Jeremiah; Poling, Ronald

    Final technical report of the University of Minnesota experimental high energy physics group for ARRA support. The Cryogenic Dark Matter Experiment (CDMS) used the funds received to construct a new passive shield to protect a high-purity germanium detector located in the Soudan mine in Northern Minnesota from cosmic rays. The BESIII and the CMS groups purchased computing hardware to assemble computer farms for data analysis and to generate large volumes of simulated data for comparison with the data collected.

  6. Making a Difference in the Lives of Infants and Toddlers and Their Families: The Impacts of Early Head Start. Volumes I-III: Final Technical Report [and] Appendixes [and] Local Contributions to Understanding the Programs and Their Impacts.

    ERIC Educational Resources Information Center

    Love, John M.; Kisker, Ellen Eliason; Ross, Christine M.; Schochet, Peter Z.; Brooks-Gunn, Jeanne; Paulsell, Diane; Boller, Kimberly; Constantine, Jill; Vogel, Cheri; Fuligni, Alison Sidle; Brady-Smith, Christy

    Early Head Start was designed in 1994 as a 2-generation program to enhance children's development and health, strengthen family and community partnerships, and support the staff delivering new services to low-income families with pregnant women, infants, or toddlers. This document contains the final technical report, appendixes, and local…

  7. International Project on Technical and Vocational Education (UNEVOC). International Advisory Committee (First Session, Berlin, Germany, September 20-22, 1993). Final Report = Projet International pour l'Enseignement Technique et Professionnel (UNEVOC). Comite Consultatif International (Premiere Session, Berlin, Germany, 20-22 septembre 1993). Rapport Final.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    The international advisory committee of the International Project on Technical and Vocational Education (UNEVOC) held its first session in Berlin in September 1993. The advisory committee's 10 members and observers from the United Nations' specialized, intergovernmental, and nongovernmental organizations discussed educational policy, links between…

  8. Lightning Protection Guidelines for Aerospace Vehicles

    NASA Technical Reports Server (NTRS)

    Goodloe, C. C.

    1999-01-01

    This technical memorandum provides lightning protection engineering guidelines and technical procedures used by the George C. Marshall Space Flight Center (MSFC) Electromagnetics and Aerospace Environments Branch for aerospace vehicles. The overviews illustrate the technical support available to project managers, chief engineers, and design engineers to ensure that aerospace vehicles managed by MSFC are adequately protected from direct and indirect effects of lightning. Generic descriptions of the lightning environment and vehicle protection technical processes are presented. More specific aerospace vehicle requirements for lightning protection design, performance, and interface characteristics are available upon request to the MSFC Electromagnetics and Aerospace Environments Branch, mail code EL23.

  9. 10 CFR 830.205 - Technical safety requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2010-01-01 2010-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...

  10. 44 CFR 18.300 - Professional and technical services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and technical services” shall be limited to advice and analysis directly applying any professional or... and analysis directly applying their professional or technical expertise and unless the advice or... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Professional and technical...

  11. 44 CFR 18.300 - Professional and technical services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and technical services” shall be limited to advice and analysis directly applying any professional or... and analysis directly applying their professional or technical expertise and unless the advice or... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Professional and technical...

  12. 10 CFR 830.205 - Technical safety requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2011-01-01 2011-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...

  13. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  14. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  15. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  16. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  17. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  18. 10 CFR 905.40 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Technical assistance. 905.40 Section 905.40 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Energy Services § 905.40 Technical assistance. Western shall establish a program that provides technical assistance to customers to conduct integrated...

  19. 24 CFR 901.235 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Technical assistance. 901.235... DEVELOPMENT PUBLIC HOUSING MANAGEMENT ASSESSMENT PROGRAM § 901.235 Technical assistance. (a) The Department may provide technical assistance to a PHA that is in substantial default. (b) The Department may...

  20. Fort Collins Science Center - Fiscal Year 2008 Science Accomplishments

    USGS Publications Warehouse

    Wilson, Juliette T.

    2009-01-01

    Public land and natural resource managers in the United States are confronted with increasingly complex decisions that have important ramifications for both ecological and human systems. The scientists and technical professionals at the U.S. Geological Survey (USGS) Fort Collins Science Center (FORT) contribute a unique blend of ecological, socioeconomic, and technological expertise to investigating complicated ecological problems that address critical management questions. In Fiscal Year 2008 (FY08), FORT's scientific and technical professionals continued research vital to the science and management needs of U.S. Department of the Interior agencies and other entities. This annual report describes select FY08 accomplishments in research and technical assistance involving biological information management and delivery; aquatic, riparian, and managed-river ecosystems; invasive species; status and trends of biological resources (including human dimensions and social science); terrestrial ecosystems; and fish and wildlife resources.

  1. The Role of the U.S. Government Technical Report in Aeronautics: An Exploratory Study

    DTIC Science & Technology

    1988-08-01

    survey questionnaire. 14 23. Technical Discipline -- for purposes of this study technical disciplines include aeronautics, astronautics, chemistry ...report varies because it serves different roles in communicating within and between organizations. The technical report has been defined etymologically ...and Information Systems - Administrative/Management - Other o Technical Discipline * - Aeronautics - Astronautics - Chemistry and Materials

  2. 25 CFR 1200.43 - How can a tribe apply for technical assistance?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false How can a tribe apply for technical assistance? 1200.43... AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Technical Assistance § 1200.43 How can a tribe apply for technical assistance? (a) Tribes wishing technical assistance may request it by sending us a letter along...

  3. Renewable Fuel Standard (RFS2): Final Rule Additional Resources

    EPA Pesticide Factsheets

    The final rule of fuels and fuel additives: renewable fuel standard program is published on March 26, 2010 and is effective on July 1, 2010. You will find the links to this final rule and technical amendments supporting this rule.

  4. An approach to knowledge structuring for advanced phases of the Technical and Management Information System (TMIS)

    NASA Technical Reports Server (NTRS)

    Goranson, H. T.

    1986-01-01

    The Technical and Management Information System (TMIS) must employ on enlightened approach to its object structure, but basic issues in conceptual structuring remain to be resolved. Sirius outlines the necessary agenda and reports on progress toward solutions.

  5. 13 CFR 124.107 - What is potential for success?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... eligibility is based have substantial business management experience; (ii) The applicant has demonstrated technical experience to carry out its business plan with a substantial likelihood for success if admitted to... will also consider the technical and managerial experience of the applicant concern's managers, the...

  6. 75 FR 48273 - Technical Service Provider Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... DEPARTMENT OF AGRICULTURE Natural Resources Conservation Service 7 CFR Part 652 RIN 0578-AA48 Technical Service Provider Assistance AGENCY: Natural Resources Conservation Service, United States Department of Agriculture. ACTION: Final rule; Correcting amendment. SUMMARY: The Natural Resources...

  7. Partial Withdrawal and Final Rule for Nonroad Technical Amendments

    EPA Pesticide Factsheets

    Amendments to the technical hardship provisions under the Transition Program for Equipment Manufacturers related to the Tier 4 standards for nonroad diesel engines, and to the replacement engine exemption generally applicable to new nonroad engines.

  8. SUPERFUND TECHNICAL SUPPORT

    EPA Science Inventory

    Under this task, technical support is provided to Regional Remedial Project Managers (RPMs)/On-Scene Coordinators (OSCs) at Superfund, RCRA, and Brownfields sites contaminated with hazardous materials by the Technical Support Center (TSC) for Monitoring and Site Characterization....

  9. 12 CFR 1805.303 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... proposes to become a CDFI. Such technical assistance may include training for management and other... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Technical assistance. 1805.303 Section 1805.303... COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS PROGRAM Use of Funds/Eligible Activities § 1805.303 Technical...

  10. 78 FR 44104 - Notice of Intent To Issue a Funding Opportunity Announcement; Technical Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... Funding Opportunity Announcement; Technical Assistance AGENCY: Federal Energy Management Program, Office.... This notice also is to inform Federal agencies of the availability of technical assistance in advance.... FOR FURTHER INFORMATION CONTACT: For requests for technical assistance regarding CHP, please contact...

  11. 41 CFR 105-69.205 - Professional and technical services.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... section, “professional and technical services” shall be limited to advice and analysis directly applying... this section unless they provide advice and analysis directly applying their professional or technical... technical services. 105-69.205 Section 105-69.205 Public Contracts and Property Management Federal Property...

  12. 41 CFR 105-69.300 - Professional and technical services.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., “professional and technical services” shall be limited to advice and analysis directly applying any professional... provide advice and analysis directly applying their professional or technical expertise and unless the... technical services. 105-69.300 Section 105-69.300 Public Contracts and Property Management Federal Property...

  13. 44 CFR 300.2 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Technical assistance. 300.2... HOMELAND SECURITY PREPAREDNESS DISASTER PREPAREDNESS ASSISTANCE § 300.2 Technical assistance. Requests for technical assistance under section 201(b) of the Act shall be made by the Governor or his/her designated...

  14. Arctic Energy Technology Development Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sukumar Bandopadhyay; Charles Chamberlin; Robert Chaney

    2008-12-31

    The Arctic Energy Technology Development Laboratory was created by the University of Alaska Fairbanks in response to a congressionally mandated funding opportunity through the U.S. Department of Energy (DOE), specifically to encourage research partnerships between the university, the Alaskan energy industry, and the DOE. The enabling legislation permitted research in a broad variety of topics particularly of interest to Alaska, including providing more efficient and economical electrical power generation in rural villages, as well as research in coal, oil, and gas. The contract was managed as a cooperative research agreement, with active project monitoring and management from the DOE. Inmore » the eight years of this partnership, approximately 30 projects were funded and completed. These projects, which were selected using an industry panel of Alaskan energy industry engineers and managers, cover a wide range of topics, such as diesel engine efficiency, fuel cells, coal combustion, methane gas hydrates, heavy oil recovery, and water issues associated with ice road construction in the oil fields of the North Slope. Each project was managed as a separate DOE contract, and the final technical report for each completed project is included with this final report. The intent of this process was to address the energy research needs of Alaska and to develop research capability at the university. As such, the intent from the beginning of this process was to encourage development of partnerships and skills that would permit a transition to direct competitive funding opportunities managed from funding sources. This project has succeeded at both the individual project level and at the institutional development level, as many of the researchers at the university are currently submitting proposals to funding agencies, with some success.« less

  15. Ground Water Technical Support Center (GWTSC) Annual ...

    EPA Pesticide Factsheets

    The Ground Water Technical Support Center (GWTSC) is part of the Ground Water and Ecosystems Restoration Division (GWERD), which is based in the Robert S. Kerr Environmental Research Center in Ada, Oklahoma. The GWERD is a research division of U.S. EPA’s National Risk Management Research Laboratory (NRMRL). The GWTSC is one of an interlinked group of specialized Technical Support Centersthat were established under the Technical Support Project (TSP). The GWTSC provides technical support on issues related to groundwater. Specifically, the GWTSC provides technical support to U.S. EPA and State regulators for issues and problems related to:1. subsurface contamination (contaminants in ground water, soils and sediments),2. cross-media transfer (movement of contaminants from the subsurface to other media such as surface water or air), and3. restoration of impacted ecosystems.The GWTSC works with Remedial Project Managers (RPMs) and other decision makers to solve specific problems at Superfund, RCRA (Resource Conservation and Recovery Act), Brownfields sites, and ecosystem restoration sites. The Ground Water Technical Support Center (GWTSC) is part of the Ground Water and Ecosystems Restoration Division (GWERD), which is based in the Robert S. Kerr Environmental Research Center in Ada, Oklahoma. The GWERD is a research division of U.S. EPA’s National Risk Management Research Laboratory (NRMRL). The GWTSC is one of an interlinked group of specialized Technical Suppo

  16. Spacecraft systems engineering: An introduction to the process at GSFC

    NASA Technical Reports Server (NTRS)

    Fragomeni, Tony; Ryschkewitsch, Michael G.

    1993-01-01

    The main objective in systems engineering is to devise a coherent total system design capable of achieving the stated requirements. Requirements should be rigid. However, they should be continuously challenged, rechallenged and/or validated. The systems engineer must specify every requirement in order to design, document, implement and conduct the mission. Each and every requirement must be logically considered, traceable and evaluated through various analysis and trade studies in a total systems design. Margins must be determined to be realistic as well as adequate. The systems engineer must also continuously close the loop and verify system performance against the requirements. The fundamental role of the systems engineer, however, is to engineer, not manage. Yet, in large, complex missions, where more than one systems engineer is required, someone needs to manage the systems engineers, and we call them 'systems managers.' Systems engineering management is an overview function which plans, guides, monitors and controls the technical execution of a project as implemented by the systems engineers. As the project moves on through Phases A and B into Phase C/D, the systems engineering tasks become a small portion of the total effort. The systems management role increases since discipline subsystem engineers are conducting analyses and reviewing test data for final review and acceptance by the systems managers.

  17. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  18. Installation Restoration Program Preliminary Assessment Naknek Recreational Camps, Alaska

    DTIC Science & Technology

    1989-04-01

    training, as well as other environmental matters. DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design...operations, and company R&D efforts. 3 DETOX . Inc. (1985-1986): Eastern Regional Manager As regional manager for the eastern United States, responsibilities...resulted in establishing a widespread customer interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as

  19. The ISACA Business Model for Information Security: An Integrative and Innovative Approach

    NASA Astrophysics Data System (ADS)

    von Roessing, Rolf

    In recent years, information security management has matured into a professional discipline that covers both technical and managerial aspects in an organisational environment. Information security is increasingly dependent on business-driven parameters and interfaces to a variety of organisational units and departments. In contrast, common security models and frameworks have remained largely technical. A review of extant models ranging from [LaBe73] to more recent models shows that technical aspects are covered in great detail, while the managerial aspects of security are often neglected.Likewise, the business view on organisational security is frequently at odds with the demands of information security personnel or information technology management. In practice, senior and executive level management remain comparatively distant from technical requirements. As a result, information security is generally regarded as a cost factor rather than a benefit to the organisation.

  20. Mixed strategies for energy conservation and alternative energy utilization (solar) in buildings. Final report. Volume II. Detailed results. [New York, Atlanta, Omaha, and Albuquerque

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1977-06-01

    The mixed-strategy analysis was a tradeoff analysis between energy-conservation methods and an alternative energy source (solar) considering technical and economic benefits. The objective of the analysis was to develop guidelines for: reducing energy requirements; reducing conventional fuel use; and identifying economic alternatives for building owners. The analysis was done with a solar system in place. This makes the study unique in that it is determining the interaction of energy conservation with a solar system. The study, therefore, established guidelines as to how to minimize capital investment while reducing the conventional fuel consumption through either a larger solar system or anmore » energy-conserving technique. To focus the scope of energy-conservation techniques and alternative energy sources considered, five building types (house, apartment buildings, commercial buildings, schools, and office buildings) were selected. Finally, the lists of energy-conservation techniques and alternative energy sources were reduced to lists of manageable size by using technical attributes to select the best candidates for further study. The resultant energy-conservation techniques were described in detail and installed costs determined. The alternative energy source reduced to solar. Building construction characteristics were defined for each building for each of four geographic regions of the country. A mixed strategy consisting of an energy-conservation technique and solar heating/hot water/cooling system was analyzed, using computer simulation to determine the interaction between energy conservation and the solar system. Finally, using FEA fuel-price scenarios and installed costs for the solar system and energy conservation techniques, an economic analysis was performed to determine the cost effectiveness of the combination. (MCW)« less

  1. Report-reading patterns of technical managers and nonmanagers

    NASA Technical Reports Server (NTRS)

    Pinelli, T. E.; Cordle, V. M.; Glassman, M.; Vondran, R. F., Jr.

    1984-01-01

    A survey to determine the review and reading processes used by technical managers and nonmanagers indicates that the summary, abstract, conclusion, title page, and introduction are the components used most frequently by both groups to decide whether to read a NASA technical report. In the review process, significantly more managers than nonmanagers use the summary and conclusion, whereas significantly more nonmanagers use the abstract and title page. The most common sequence of review consists of the title page, abstract, and summary, in that order, for both groups. In the reading process, the conclusion, results and discussion, and summary are the components read by the highest percentage of both groups.

  2. Space Solar Power Demonstrations: Challenges and Progress

    NASA Technical Reports Server (NTRS)

    Howell, Joe T.; Mankins, John C.; Lavoie, Anthony R. (Technical Monitor)

    2002-01-01

    The prospects of using electrical power beamed from space are coming closer to reality with the continued pursuit and improvements in the supporting space solar research and technology. Space Solar Power (SSP) has been explored off and on for approximately three decades as a viable alternative and clean energy source. Results produced through the more recent Space Solar Power Exploratory Research and Technology (SERT) program involving extensive participation by industry, universities, and government has provided a sound technical basis for believing that technology can be improved to the extent that SSP systems can be built, economically feasible, and successfully deployed in space. Considerable advancements have been made in conceptual designs and supporting technologies including solar power generation, wireless power transmission, power management distribution, thermal management and materials, and the integrated systems engineering assessments. Basic technologies have progressed to the point were the next logical step is to formulate and conduct sophisticated demonstrations involving prototype hardware as final proof of concepts and identify high end technology readiness levels in preparation for full scale SSP systems designs. In addition to continued technical development issues, environmental and safety issues must be addressed and appropriate actions taken to reassure the public and prepare them for the future use of this alternative renewable energy resource. Accomplishing these objectives will allow informed future decisions regarding further SSP and related R&D investments by both NASA management and prospective external partners. In particular, accomplishing these objectives will also guide further definition of SSP and related technology roadmaps including performance objectives, resources and schedules; including 'multi-purpose' applications (terrestrial markets, science, commercial development of space, and other government missions).

  3. A Case Study of Technical Assistance to Demonstration Programs for Young Handicapped Children. Part III.

    ERIC Educational Resources Information Center

    Behr, Shirley K.; And Others

    The report describes the third and final year of a 3-year case study of the technical assistance process as implemented by the Technical Assistance Development System (TADS) for the staffs of two demonstration programs for preschool handicapped children and their families. Following a review of TADS and the two demonstration programs, the…

  4. NBS computerized carpool matching system: users' guide. Final technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilsinn, J.F.; Landau, S.

    1974-12-01

    The report includes flowcharts, input/output formats, and program listings for the programs, plus details of the manual process for coordinate coding. The matching program produces, for each person desiring it, a list of others residing within a pre-specified distance of him, and is thus applicable to a single work destination having primarily one work schedule. The system is currently operational on the National Bureau of Standards' UNIVAC 1108 computer and was run in March of 1974, producing lists for about 950 employees in less than four minutes computer time. Subsequent maintenance of the system will be carried out by themore » NBS Management and Organization Division. (GRA)« less

  5. Hourly temporal distribution of wind

    NASA Astrophysics Data System (ADS)

    Deligiannis, Ilias; Dimitriadis, Panayiotis; Koutsoyiannis, Demetris

    2016-04-01

    The wind process is essential for hydrometeorology and additionally, is one of the basic renewable energy resources. Most stochastic forecast models are limited up to daily scales disregarding the hourly scale which is significant for renewable energy management. Here, we analyze hourly wind timeseries giving emphasis on the temporal distribution of wind within the day. We finally present a periodic model based on statistical as well as hydrometeorological reasoning that shows good agreement with data. Acknowledgement: This research is conducted within the frame of the undergraduate course "Stochastic Methods in Water Resources" of the National Technical University of Athens (NTUA). The School of Civil Engineering of NTUA provided moral support for the participation of the students in the Assembly.

  6. Building America Industrialized Housing Partnership (BAIHP II)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abernethy, Bob; Chandra, Subrato; Baden, Steven

    2010-11-30

    This report summarizes the work conducted by the Building America Industrialized Housing Partnership (BAIHP - www.baihp.org) during the final budget period (BP5) of our contract, January 1, 2010 to November 30, 2010. Highlights from the four previous budget periods are included for context. BAIHP is led by the Florida Solar Energy Center (FSEC) of the University of Central Florida. With over 50 Industry Partners including factory and site builders, work in BP5 was performed in six tasks areas: Building America System Research Management, Documentation and Technical Support; System Performance Evaluations; Prototype House Evaluations; Initial Community Scale Evaluations; Project Closeout, Finalmore » Review of BA Communities; and Other Research Activities.« less

  7. Development and implementation of a clinical pathway approach to simulation-based training for foregut surgery

    PubMed Central

    Miyasaka, Kiyoyuki W; Buchholz, Joseph; LaMarra, Denise; Karakousis, Giorgos C; Aggarwal, Rajesh

    2015-01-01

    Introduction Contemporary demands on resident education call for integration of simulation. We designed and implemented a simulation-based curriculum for PGY1 surgery residents to teach technical and non-technical skills within a clinical pathway approach for a foregut surgical patient, from outpatient visit through surgery and post-op follow-up. Methods The three-day curriculum for groups of six residents comprises a combination of standardized patient (SP) encounters, didactic sessions, and hands-on training. The curriculum is underpinned by a summative simulation “pathway” repeated on days 1 and 3. The “pathway” is a series of simulated pre-op, intra-op, and post-op encounters following a single patient through a disease process. The resident sees an SP in clinic presenting with distal gastric cancer, then enters an operating room to perform a gastro-jejunostomy on a porcine tissue model. Finally, the resident engages in a simulated post-operative visit. All encounters are rated by faculty members and the residents themselves, using standardized assessment forms endorsed by the American Board of Surgery. Results 18 first-year residents underwent this curriculum. Faculty ratings of overall operative performance significantly improved following the three-day module. Ratings of preoperative and postoperative performance were not significantly changed in three days. Resident self-ratings significantly improved for all encounters assessed, as did reported confidence in meeting defined learning objectives. Conclusions Conventional surgical simulation training focuses on technical skills in isolation. Our novel “pathway” curriculum targets an important gap in training methodologies by placing both technical and non-technical skills in their clinical context as part of managing a surgical patient. Results indicate consistent improvements in assessments of performance as well as confidence and support its continued usage to educate surgery residents in foregut surgery. PMID:25869238

  8. 48 CFR 2452.242-71 - Contract management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., concise summary of technical progress made and the costs incurred for each task during the reporting... technical progress made for each task during the reporting period; and (B) Identifies problems, or potential... and progress reporting as described herein. (b) The contract management system shall consist of two...

  9. 75 FR 4122 - Data Collection Available for Public Comments and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... disadvantaged businesses with management and technical assistance to enhance their ability to compete in the..., and management and technical assistance through 7(j) designated funds) to foster the business growth... questions to legal land insurance, business planning, financing, marketing and business operations) that...

  10. Chemical Durability Improvement and Static Fatigue of Glasses.

    DTIC Science & Technology

    1982-08-01

    Afl-Alla 837 RENSSELAER POLYIECmfJ!C INST TRtOY NY DEPT OF MATERIAL--ETC F/6 ii/ CHEMICAL DURABILITY IMPROVEMENT AND STATIC FATIGUE OF GLASSESW AUC2...82 M TOMOZAWA NOGGIN 7A-C-0315 UNC LASS IF IED N ENEEEEEE FINAL TECHNICAL REPORT For the period April 1, 1978 "u March 31, 198200 CHEMICAL DURABILITY...REPORT A PERIOD COVERED Chemical Durability Improvement and Static Final Technical Report Fatiue o GlasesApril 1, 1978"’,March 31, 1982 S. PERFORMING ORG

  11. Experimental Program Final Technical Progress Report: 15 February 2007 to 30 September 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kinney, Edward R.

    2014-09-12

    This is the final technical report of the grant DE-FG02-04ER41301 to the University of Colorado at Boulder entitled "Intermediate Energy Nuclear Physics" and describes the results of our funded activities during the period 15 February 2007 to 30 September 2012. These activities were primarily carried out at Fermilab, RHIC, and the German lab DESY. Significant advances in these experiments were carried out by members of the Colorado group and are described in detail.

  12. Final Technical Report - Center for Technology for Advanced Scientific Component Software (TASCS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sussman, Alan

    2014-10-21

    This is a final technical report for the University of Maryland work in the SciDAC Center for Technology for Advanced Scientific Component Software (TASCS). The Maryland work focused on software tools for coupling parallel software components built using the Common Component Architecture (CCA) APIs. Those tools are based on the Maryland InterComm software framework that has been used in multiple computational science applications to build large-scale simulations of complex physical systems that employ multiple separately developed codes.

  13. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanson, David

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  14. Renewable Fuel Standard Program (RFS1): Final Rule Additional Resources

    EPA Pesticide Factsheets

    The final rule of fuels and fuel additives: renewable fuel standard program is published on May 1, 2007 and is effective on September 1, 2007. You will find the links to this final rule and technical amendments supporting this rule.

  15. 44 CFR 65.15 - List of communities submitting new technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technical data. This section provides a cumulative list of communities where modifications of the base flood elevation determinations have been made because of submission of new scientific or technical data. Due to... submitting new technical data. 65.15 Section 65.15 Emergency Management and Assistance FEDERAL EMERGENCY...

  16. 25 CFR 1200.42 - Who can provide technical assistance?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Who can provide technical assistance? 1200.42 Section 1200.42 Indians OFFICE OF THE SPECIAL TRUSTEE FOR AMERICAN INDIANS, DEPARTMENT OF THE INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Technical Assistance § 1200.42 Who can provide technical...

  17. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Provision of technical... PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance... technical assistance to the licensee. Such assistance may be provided during the pendency of an appeal under...

  18. Assurance Penalty Level Analysis Final Rule TSD

    EPA Pesticide Factsheets

    This Technical Support Document (TSD) supports EPA’s determination that the final Transport Rule’s assurance provision penalty requirement provides sufficient deterrence against a state exceeding its assurance level.

  19. Final Rule for Technical Amendments to the Highway and Nonroad Diesel Regulations

    EPA Pesticide Factsheets

    This action corrects errors and omissions from the previous rules, makes minor changes to the regulations to assist entities with regulatory compliance, and makes technical amendments that resulted from discussions with various diesel stakeholders.

  20. Managing change: an overview.

    PubMed

    Lorenzi, N M; Riley, R T

    2000-01-01

    As increasingly powerful informatics systems are designed, developed, and implemented, they inevitably affect larger, more heterogeneous groups of people and more organizational areas. In turn, the major challenges to system success are often more behavioral than technical. Successfully introducing such systems into complex health care organizations requires an effective blend of good technical and good organizational skills. People who have low psychological ownership in a system and who vigorously resist its implementation can bring a "technically best" system to its knees. However, effective leadership can sharply reduce the behavioral resistance to change-including to new technologies-to achieve a more rapid and productive introduction of informatics technology. This paper looks at four major areas-why information system failures occur, the core theories supporting change management, the practical applications of change management, and the change management efforts in informatics.

  1. Study on the financing mechanism and management for decommissioning of nuclear installations in Malaysia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saleh, Lydia Ilaiza, E-mail: lydiailaiza@gmail.com; Ryong, Kim Tae

    The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of thismore » paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.« less

  2. Management of optics. [for HEAO-2 X ray telescope

    NASA Technical Reports Server (NTRS)

    Kirchner, T. E.; Russell, M.

    1981-01-01

    American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.

  3. 76 FR 55943 - Notice of Public Meeting, North Slope Science Initiative-Science Technical Advisory Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...

  4. 76 FR 10388 - Notice of Public Meeting, North Slope Science Initiative-Science Technical Advisory Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...

  5. 75 FR 79017 - Notice of Public Meeting, North Slope Science Initiative-Science Technical Advisory Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...

  6. 77 FR 21806 - Notice of Public Meeting, North Slope Science Initiative-Science Technical Advisory Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...

  7. 75 FR 17433 - Notice of Public Meeting, North Slope Science Initiative-Science Technical Advisory Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...

  8. 75 FR 52370 - Notice of Public Meeting, North Slope Science Initiative-Science Technical Advisory Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-25

    ...] Notice of Public Meeting, North Slope Science Initiative-Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...

  9. 78 FR 4870 - Notice of Public Meeting, North Slope Science Initiative-Science Technical Advisory Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...

  10. Technical and Management Information System (TMIS)

    NASA Technical Reports Server (NTRS)

    Rau, Timothy R.

    1987-01-01

    The TMIS goals developed to support the Space Station Program (SSP) mission requirements are outlined. The TMIS will provide common capabilities to all SSP centers and facilitate the flow of technical and management information throughout the program as well as SSP decision-making processes. A summary is presented of the various TMIS phases.

  11. Differences in the Vocational Interests of Research and Development Managers versus Technical Specialists.

    ERIC Educational Resources Information Center

    Hill, Raymond E.; Roselle, Pamela F.

    1985-01-01

    Compared the occupational interests of research and development managers (N=110) and technical specialists (N=55). Analysis on the general occupational themes and basic interest scales of the Strong-Campbell Interest Inventory indicated the social, enterprising, and conventional areas predicted managerial group membership, whereas the artistic…

  12. UW-Stout's Bachelor's in Industrial Management

    ERIC Educational Resources Information Center

    Dittmann, Wendy

    2008-01-01

    The Bachelor of Science in Industrial Management (BSIM) was designed for technical college graduates with work experience because the University of Wisconsin-Stout (UW-Stout) recognized a need among adult students with technical college degrees. The program was developed to provide these students with an opportunity to earn baccalaureate degrees…

  13. Succession Planning for Management Staff at a Western Canadian Postsecondary Technical Institute.

    ERIC Educational Resources Information Center

    Cembrowski, Barbara Joan; da Costa, Jose L.

    This study used naturalistic inquiry to gain an understanding of how managerial personnel perceived career development and succession planning at a postsecondary technical institute in Canada. A total of nine individuals in three different career development stages completed semistructured interviews. It was found that managers perceived the…

  14. Succession Planning for Management Staff at a Canadian Post Secondary Technical Institute.

    ERIC Educational Resources Information Center

    da Costa, Jose; Cembrowski, Barbara

    2001-01-01

    Analyzed interviews to explore how nine administrators, at three different career stages, perceived career-development and succession planning at a Canadian postsecondary technical institute. Managers attribute career success to possession of varied personal attributes, diverse work experiences, serendipity, and a fulfilling work environment. Job…

  15. 25 CFR 1200.41 - What types of technical assistance are available?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false What types of technical assistance are available? 1200.41 Section 1200.41 Indians OFFICE OF THE SPECIAL TRUSTEE FOR AMERICAN INDIANS, DEPARTMENT OF THE INTERIOR...; selection of investment managers; monitoring of investments; asset management; or other assistance...

  16. 25 CFR 1200.41 - What types of technical assistance are available?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false What types of technical assistance are available? 1200.41 Section 1200.41 Indians OFFICE OF THE SPECIAL TRUSTEE FOR AMERICAN INDIANS, DEPARTMENT OF THE INTERIOR...; selection of investment managers; monitoring of investments; asset management; or other assistance...

  17. 25 CFR 1200.41 - What types of technical assistance are available?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What types of technical assistance are available? 1200.41 Section 1200.41 Indians OFFICE OF THE SPECIAL TRUSTEE FOR AMERICAN INDIANS, DEPARTMENT OF THE INTERIOR...; selection of investment managers; monitoring of investments; asset management; or other assistance...

  18. 25 CFR 1200.41 - What types of technical assistance are available?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false What types of technical assistance are available? 1200.41 Section 1200.41 Indians OFFICE OF THE SPECIAL TRUSTEE FOR AMERICAN INDIANS, DEPARTMENT OF THE INTERIOR...; selection of investment managers; monitoring of investments; asset management; or other assistance...

  19. DOE scientific and technical information management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beasly, M.

    The objective of this paper was a discussion of the mission objectives and program activities of the DOE Office of Scientific and Technical Information. Topics of discussion were: (1) program direction and structure; (2) representation in gov`t and international organizations; (3) management of information; and (4) consultation and assistance.

  20. NASA STI Program Seminar: Electronic documents

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The theme of this NASA Scientific and Technical Information Program Seminar was electronic documents. Topics covered included Electronic Documents Management at the CASI, the Impact of Electronic Publishing on User Expectations and Searching Image Record Management, Secondary Publisher Considerations for Electronic Journal Literature, and the Technical Manual Publishing On Demand System (TMPODS).

Top